WorldWideScience

Sample records for multiple restoration projects

  1. Assessing data quality for a federal environmental restoration project: Rationalizing the requirements of multiple clients

    Kiszka, V.R.; Carlsen, T.M.

    1994-07-01

    Most environmental restoration projects at federal facilities face the difficult task of melding the quality assurance (QA) requirements of multiple clients, as well as dealing with historical data that are often of unknown quality. At Lawrence Livermore National Laboratory (LLNL), we have successfully integrated the requirements of our multiple clients by carefully developing a QA program that efficiently meets our clients' needs. The Site 300 Experimental Test Site is operated by LLNL in support of its national defense program. The responsibility for conducting environmental contaminant investigations and restoration at Site 300 is vested in the Site 300 Environmental Restoration Project (Site 300 ERP) of LLNL's Environmental Restoration Division. LLNL Site 300 ERP must comply with the QA requirements of several clients, which include: the LLNL Environmental Protection Department, the DOE, the US Environmental Protection Agency-Region IX (EPA), the California Regional Water Quality Control Board -- Central Valley Region, and the California Department of Toxic Substances Control. This comprehensive QA program was used to determine the acceptability of historical data. The Site 300 ERP began soil and ground water investigations in 1982. However, we did not begin receiving analytical quality assurance/quality control (QA/QC) data until 1989; therefore, the pre-1989 data that were collected are of unknown quality. The US EPA QAMS-005/80 defines data quality as the totality of features and characteristics of data that bears on its ability to satisfy a given purpose. In the current context, the characteristics of major importance are accuracy, precision, completeness, representativeness, and comparability. Using our established QA program, we determined the quality of this historical data based on its comparability to the post-1989 data. By accepting this historical data, we were able to save a considerable amount of money in recharacterization costs

  2. Integrating ecological restoration into CDM forestry projects

    Ma, Maohua; Haapanen, Toni; Singh, Ram Babu; Hietala, Reija

    2014-01-01

    Highlights: • Concerns and issues in sustainability of CDM forestry projects are reviewed. • Ecological restoration is suggested to be integrated in the CDM framework. • As an ecosystem supporting service, soil restoration on degraded land is of primary importance. • Regenerating forests naturally rather than through monoculture plantations is suggested. • Potential social impacts of ecological restoration are discussed. - Abstract: The Clean Development Mechanism (CDM) is proposed to reduce greenhouse gas emissions and promote sustainable development. CDM forestry projects should contribute to mitigation of climate change through afforestation and reforestation (A/R) activities on degraded land in developing countries. However, like other types of CDM projects, the forestry projects have encountered a number of concerns and critiques. Appropriate approaches and concrete aims to achieve long-term sustainability have been lacking, and reforms have therefore been called for. The aims of this paper are to examine the published information relevant to these concerns, and frame appropriate approaches for a more sustainable CDM. In this review, as a first step to tackle some of these issues, ecological restoration is suggested for integration into the CDM framework. Essentially, this involves the restoration of ecosystem supporting service (soil restoration), upon which forests regenerate naturally rather than establishing monoculture plantations. In this way, forestry projects would bring cost-effective opportunities for multiple ecosystem services. Potential approaches, necessary additions to the monitoring plans, and social impacts of ecological restoration in CDM projects are discussed

  3. [Multiple agenesis and prosthetic restoration].

    Renault, P

    1990-03-01

    Cases of multiple agenesia present some difficulties in the treatment planing. Three situations may be encountered: limited agenesia, restored by a fixed, bonded or cemented prosthesis, multiple uni- or bimaxillary agenesia without remaining of deciduous teeth, restored by a fixed, bonded or cemented prosthesis or the partial adjacent prosthesis, multiple uni- or bimaxillary agenesia with remaining of deciduous teeth, restored by means of a supra-dental prosthesis. The first two situations have been described in dental literature and are relatively easy to treat. The same is not true for the third situation, where the decision to keep the temporary teeth considerably increases the difficulty of prosthetic restoration. This subject will be illustrated by the presentation of a clinical case of multiple bi-maxillary agenesia. The patient has: on the maxilla: an absence of 9 permanent teeth (18, 15, 14, 12, 22, 23, 24, 25, 28) and the presence of 4 deciduous teeth (62, 63, 64, 65), on the mandible: an absence of all permanent teeth, with the exception of 36 and 46, and the remaining of 4 deciduous teeth (75, 73, 83, 84). The remaining of deciduous teeth and the presence of a very high inter-arch space led to opting for dental coverage so as to keep the deciduous teeth and a proper vertical dimension. The patient wished to solve his "problem" in the maxilla first, and is not wanting to undergo the extraction of his deciduous teeth. The following therapeutic proposal was adapted: On the maxilla, a three-step procedure: first step: building of metal copings on 13, 16 and 26 and metal-ceramic crowns on 11 and 21, second step: building of telescop crowns on 16 and 26 and clasps on 13, 11 and 21, third step: casting of the removable partial denture framework and soldering to the telescop crowns and clasps. On the mandible, a provisional restoration using a supra-dental resin removable partial denture with ceramic occlusal surfaces was adopted. The aesthetic and functional

  4. Poplar Island Environmental Restoration Project Nekton Data

    National Oceanic and Atmospheric Administration, Department of Commerce — The Poplar Island Environmental Restoration Project (PIERP) is a large scale 1,800 acres restoration project located in mid Chesapeake Bay. Fishery collections are...

  5. Environmental restoration project configuration control

    Hutterman, L.L.

    1991-01-01

    This paper provides an overview of the approach that Westinghouse Idaho Nuclear Company, Inc. (WINCO) is using for the implementation of the configuration control requirements for a major system acquisition under the guidance of US Department of Energy (DOE) Order 4700.1, open-quotes Project Management System,close quotes for environmental restoration. The two major features of the WINCO environmental restoration approach relate to (1) the product and (2) the maintenance of the baseline for many sites in different phases at the same time. Historically, a project has typically produced a product. Environmental restoration in some ways produces no typical project product. Essentially, what is produced and what configuration control management is exercised on is one of the following: (1) the development of clean dirt, (2) the documentation to support clean dirt, or (3) the track record of each of the sites. It is the latter approach that this paper deals with. This approach is unique in that there are four baselines [cost, schedule, scope, and technical (the track record product)] rather than the typical three. This is essential in configuration management due to the lack of a uniquely identifiable product for each site. Essentially, the philosophy behind the four-part configuration controls allows the technical baseline to fulfill the function typically met by the identifiable product

  6. Forward-looking farmers owning multiple potential wetland restoration sites: implications for efficient restoration

    Schroder (Kushch), Svetlana; Lang, Zhengxin; Rabotyagov, Sergey

    2018-04-01

    Wetland restoration can increase the provision of multiple non-market ecosystem services. Environmental and socio-economic factors need to be accounted for when land is withdrawn from agriculture and wetlands are restored. We build multi-objective optimization models to provide decision support for wetland restoration in the Le Sueur river watershed in Southern Minnesota. We integrate environmental objectives of sediment reduction and habitat protection with socio-economic factors associated with the overlap of private land with potential wetland restoration sites in the watershed and the costs representing forward-looking farmers voluntarily taking land out of agricultural production in favor of wetland restoration. Our results demonstrate that the inclusion of these factors early on in the restoration planning process affects both the total costs of the restoration project and the spatial distribution of optimally selected wetland restoration sites.

  7. Incorporating climate change projections into riparian restoration planning and design

    Perry, Laura G.; Reynolds, Lindsay V.; Beechie, Timothy J.; Collins, Mathias J.; Shafroth, Patrick B.

    2015-01-01

    Climate change and associated changes in streamflow may alter riparian habitats substantially in coming decades. Riparian restoration provides opportunities to respond proactively to projected climate change effects, increase riparian ecosystem resilience to climate change, and simultaneously address effects of both climate change and other human disturbances. However, climate change may alter which restoration methods are most effective and which restoration goals can be achieved. Incorporating climate change into riparian restoration planning and design is critical to long-term restoration of desired community composition and ecosystem services. In this review, we discuss and provide examples of how climate change might be incorporated into restoration planning at the key stages of assessing the project context, establishing restoration goals and design criteria, evaluating design alternatives, and monitoring restoration outcomes. Restoration planners have access to numerous tools to predict future climate, streamflow, and riparian ecology at restoration sites. Planners can use those predictions to assess which species or ecosystem services will be most vulnerable under future conditions, and which sites will be most suitable for restoration. To accommodate future climate and streamflow change, planners may need to adjust methods for planting, invasive species control, channel and floodplain reconstruction, and water management. Given the considerable uncertainty in future climate and streamflow projections, riparian ecological responses, and effects on restoration outcomes, planners will need to consider multiple potential future scenarios, implement a variety of restoration methods, design projects with flexibility to adjust to future conditions, and plan to respond adaptively to unexpected change.

  8. Landscaping Considerations for Urban Stream Restoration Projects

    Bailey, Pam

    2004-01-01

    ... after restoration and its functionality for public use. The landscaping component of such stream and riparian restoration projects must be emphasized given its importance of visual success and public perception. The purpose of this technical note is to address landscaping considerations associated with urban stream and riparian restoration projects, and provide ideas to managers for enhancing the visual appeal and aesthetic qualities of urban projects.

  9. Project Rio Blanco: site restoration. Final report

    1978-01-01

    Project Rio Blanco was a joint Government-industry experiment using nuclear explosives to stimulate the flow of natural gas from low permeability formations which could not be economically produced through conventional methods. The project consisted of the simultaneous detonation of three nuclear explosives on May 17, 1973, in a 7,000 foot well in northwestern Colorado. Gas production testing and project evaluation continued through June 1976. The site cleanup and restoration planning phase began in December 1975 and was concluded with the issuance of an operational plan, Project Rio Blanco Site Cleanup and Restoration Plan, NVO-173, in May 1976. Actual site restoration activities were conducted during the period from July to November 1976. The activities throughout the restoration period are summarized and the final site status, including the disposition of all project facilities and the status of all project related wells after plug and abandonment and recompletion work are described

  10. Deer Island Aquatic Ecosystem Restoration Project

    2015-07-01

    across the U.S. Army Corps of Engineers (USACE) requires that a broad base of EWN understanding and support be built . The Deer Island Aquatic...USACE) requires that a broad base of EWN understanding and support be built . The Deer Island Aquatic Ecosystem Restoration Project (Deer Island AERP...Mississippi Wetlands Restoration Projects). The project received additional funding through several public laws in response to hurricane damages

  11. Fisheries Restoration Grant Program Projects [ds168

    California Natural Resource Agency — This shapefile (FRGP_All_020209.shp) represents the locations of all ongoing and completed salmonid restoration projects in California with existing records in the...

  12. South Texas Native Plant Restoration Project

    2012-10-01

    The South Texas Native Plant Restoration Project was a resounding success in that the primary goal of : developing commercial sources of native seed has been substantially met. By the conclusion of the project : on August 31, 2011, 20 native seed sou...

  13. Leadership success within disaster restoration projects.

    Rapp, Randy R; Baroudi, Bassam

    2014-01-01

    Successful project managers draw their performance from essential leadership traits, as guided by their core values.Within disaster recovery, contractors who mitigate, repair, and reconstruct the built environment are often faced with challenges exceeding the norm. The effective leader is commonly expected to consider stakeholder motivations within distressing situations as well as other external and environmental factors when seeking to lead the project team to successful outcomes. This research is most concerned with leadership within the context of disaster restoration of the built environment. Its stimulus comes from the Restoration Industry Association (RIA)'s efforts to highlight leadership traits and core values for its Certified Restorer Body of Knowledge but would be of value to others associated with disaster recovery operations. Among organizations whose membership includes thousands of practitioners who restore and reconstruct the built environment after disasters, the RIA is the only one yet to formally and substantially research which core values and leader traits are deemed critical for the success of efforts to manage the means and methods applied on recovery job sites. Forty-six seasoned disaster restoration industry project professionals voluntarily responded to a survey questionnaire that sought their opinions about the traits and core values that they consider most important for successful disaster restoration project leadership. The most important leader traits were effective communication, professional competence, and leadership by example. The most important restoration industry values were integrity, compassion, and trustworthiness. The recognized imperative of compassion was unexpected in light of stereotypes often associated with construction-related contractors. This and other findings permit disaster response and recovery stakeholders to better understand qualities they should wish to see in leaders of contractor organizations, which

  14. Environmental Restoration Project - Systems Engineering Management Plan

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  15. Lower Red River Meadow Stream Restoration Project

    1996-05-01

    As part of a continuing effort to restore anadromous fish populations in the South Fork Clearwater River basin of Idaho, Bonneville Power Administration (BPA) proposes to fund the Lower Red River Meadow Restoration Project (Project). The Project is a cooperative effort with the Idaho Soil and Water Conservation District, Nez Perce National Forest, Idaho Department of Fish and Game (IDFG), and the Nez Perce Tribe of Idaho. The proposed action would allow the sponsors to perform stream bank stabilization, aquatic and riparian habitat improvement activities on IDFG's Red River Management Area and to secure long-term conservation contracts or agreements for conducting streambank and habitat improvement activities with participating private landowners located in the Idaho County, Idaho, study area. This preliminary Environmental Assessment (EA) examines the potential environmental effects of stabilizing the stream channel, restoring juvenile fish rearing habitat and reestablishing a riparian shrub community along the stream

  16. How is success or failure in river restoration projects evaluated? Feedback from French restoration projects.

    Morandi, Bertrand; Piégay, Hervé; Lamouroux, Nicolas; Vaudor, Lise

    2014-05-01

    Since the 1990s, French operational managers and scientists have been involved in the environmental restoration of rivers. The European Water Framework Directive (2000) highlights the need for feedback from restoration projects and for evidence-based evaluation of success. Based on 44 French pilot projects that included such an evaluation, the present study includes: 1) an introduction to restoration projects based on their general characteristics 2) a description of evaluation strategies and authorities in charge of their implementation, and 3) a focus on the evaluation of results and the links between these results and evaluation strategies. The results show that: 1) the quality of an evaluation strategy often remains too poor to understand well the link between a restoration project and ecological changes; 2) in many cases, the conclusions drawn are contradictory, making it difficult to determine the success or failure of a restoration project; and 3) the projects with the poorest evaluation strategies generally have the most positive conclusions about the effects of restoration. Recommendations are that evaluation strategies should be designed early in the project planning process and be based on clearly-defined objectives. Copyright © 2014 Elsevier Ltd. All rights reserved.

  17. Management systems for environmental restoration projects

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  18. Sears Point Tidal Marsh Restoration Project: Phase I

    Information about the SFBWQP Sears Point Tidal Marsh Restoration Project: Phase I project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  19. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  20. Uranium mining environmental restoration project (PRAMU)

    Asenjo, A.

    2002-01-01

    The National Atomic Energy Commission (CNEA) started its activities 50 years ago and obtained significant results. At the present time, the CNEA is defined as an Institution of research and development in the nuclear field. It is also responsible for the management of radioactive wastes and the dismantling of nuclear and radioactive facilities. Mining and milling activities have been carried out during the past 40 years and at present the CNEA is undertaking the Uranium Mining Environmental Restoration Project (PRAMU). The aim of this project is to restore the environment as much as is possible in all places where uranium mining and milling activities were developed when taking into consideration both economic and technical reality. First, the characteristics of the problems in each site are determined through appropriate studies which identify the existing or potential impacts, the possible pathways of contamination, etc. The sites being studied are: MALARGUE (Mendoza Province), CORDOBA (Cordoba Province), LOS GIGANTES (Cordoba Province), HUEMUL (Mendoza Province), PICHINAN (Chubut Province), TONCO (Salta Province), LA ESTELA (San Luis Province), LOS COLORADOS (La Rioja Province). PRAMU seeks to improve the current conditions of the tailings deposits and mines and to ensure the long term protection of people and the environment. The CNEA is required to comply with all legislation that is in force and is under the control of various national, provincial and local State institutions. The main objectives of the project for the various sites are: (a) Malargue site: to implement the actions necessary for environmental restoration and management of the tailings derived from the uranium ores processed in the industrial plant; (b) Cordoba and Los Gigantes sites: to design, engineer and execute the activities required for closure of the sites; (c) Other sites (Huemul, Pichinan, Tonco, La Estela, Los Colorados): to develop an environmental evaluation and, on the basis of

  1. Sears Point Tidal Marsh Restoration Project: Phase II

    Information about the SFBWQP Sears Point Tidal Marsh Restoration Project: Phase II, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  2. Emerson Parcel of Dutch Slough Tidal Marsh Restoration Project

    Information about the SFBWQP Emerson Parcel of Dutch Slough Tidal Marsh Restoration Project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  3. 78 FR 26063 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Final Environmental...

    2013-05-03

    ...-100-00-0-0, CUPCA00] Central Utah Project Completion Act; East Hobble Creek Restoration Project Final... Creek Restoration Project. These two agencies have determined that the proposed [[Page 26064

  4. Prioritization of forest restoration projects: Tradeoffs between wildfire protection, ecological restoration and economic objectives

    Kevin C. Vogler; Alan A. Ager; Michelle A. Day; Michael Jennings; John D. Bailey

    2015-01-01

    The implementation of US federal forest restoration programs on national forests is a complex process that requires balancing diverse socioecological goals with project economics. Despite both the large geographic scope and substantial investments in restoration projects, a quantitative decision support framework to locate optimal project areas and examine...

  5. 75 FR 6354 - NOAA Great Lakes Habitat Restoration Program Project Grants under the Great Lakes Restoration...

    2010-02-09

    ...-04] RIN 0648-ZC10 NOAA Great Lakes Habitat Restoration Program Project Grants under the Great Lakes... Atmospheric Administration (NOAA), Department of Commerce. ACTION: Notice of funding availability; Date... on January 19, 2010. That notice announced the NOAA Great Lakes Habitat Restoration Program Project...

  6. Managing trade-offs in landscape restoration and revegetation projects.

    Maron, Martine; Cockfield, Geoff

    2008-12-01

    Landscape restoration projects often have multiple and disparate conservation, resource enhancement, and sometimes economic objectives, since projects that seek to meet more than one objective tend to be viewed more positively by funding agencies and the community. The degree to which there are trade-offs among desired objectives is an important variable for decision makers, yet this is rarely explicitly considered. In particular, the existence of ecological thresholds has important implications for decision-making at both the project level and the regional level. We develop a model of the possibilities and choices for an agency seeking to achieve two environmental objectives in a region through revegetation of a number of sites. A graphical model of the production possibilities sets for a single revegetation project is developed, and different trade-off relationships are discussed and illustrated. Then the model is used to demonstrate the possibilities for managing all such projects within a region. We show that, where there are thresholds in the trade-off relationship between two objectives, specialization (single- or dominant-objective projects) should be considered. This is illustrated using a case study in which revegetation is used to meet avian biodiversity and salinity mitigation objectives. We conclude that where there are sufficient scientific data, explicit consideration of different types of trade-offs can assist in making decisions about the most efficient mix and type of projects to better achieve a range of objectives within a region.

  7. Social Science Methods Used in the RESTORE Project

    Lynne M. Westphal; Cristy Watkins; Paul H. Gobster; Liam Heneghan; Kristen Ross; Laurel Ross; Madeleine Tudor; Alaka Wali; David H. Wise; Joanne Vining; Moira. Zellner

    2014-01-01

    The RESTORE (Rethinking Ecological and Social Theories of Restoration Ecology) project is an interdisciplinary, multi-institutional research endeavor funded by the National Science Foundation's Dynamics of Coupled Natural Human Systems program. The goal of the project is to understand the links between organizational type, decision making processes, and...

  8. Prioritization of Forest Restoration Projects: Tradeoffs between Wildfire Protection, Ecological Restoration and Economic Objectives

    Kevin C. Vogler

    2015-12-01

    Full Text Available The implementation of US federal forest restoration programs on national forests is a complex process that requires balancing diverse socioecological goals with project economics. Despite both the large geographic scope and substantial investments in restoration projects, a quantitative decision support framework to locate optimal project areas and examine tradeoffs among alternative restoration strategies is lacking. We developed and demonstrated a new prioritization approach for restoration projects using optimization and the framework of production possibility frontiers. The study area was a 914,657 ha national forest in eastern Oregon, US that was identified as a national priority for restoration with the goal of increasing fire resiliency and sustaining ecosystem services. The results illustrated sharp tradeoffs among the various restoration goals due to weak spatial correlation of forest stressors and provisional ecosystem services. The sharpest tradeoffs were found in simulated projects that addressed either wildfire risk to the urban interface or wildfire hazard, highlighting the challenges associated with meeting both economic and fire protection goals. Understanding the nature of tradeoffs between restoration objectives and communicating them to forest stakeholders will allow forest managers to more effectively design and implement economically feasible restoration projects.

  9. Richland Environmental Restoration Project management action process document

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines

  10. Richland Environmental Restoration Project management action process document

    NONE

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  11. Metro Multnomah Wetlands - Multnomah Channel Wetland Restoration Monitoring Project

    National Oceanic and Atmospheric Administration, Department of Commerce — The Multnomah Channel Wetland Restoration Monitoring Project characterizes wetlands use by juvenile salmonids and other fishes in the Multnomah Channel Marsh Natural...

  12. A Function-Based Framework for Stream Assessment & Restoration Projects

    This report lays out a framework for approaching stream assessment and restoration projects that focuses on understanding the suite of stream functions at a site in the context of what is happening in the watershed.

  13. Adaptively Addressing Uncertainty in Estuarine and Near Coastal Restoration Projects

    Thom, Ronald M.; Williams, Greg D.; Borde, Amy B.; Southard, John A.; Sargeant, Susan L.; Woodruff, Dana L.; Laufle, Jeffrey C.; Glasoe, Stuart

    2005-03-01

    Restoration projects have an uncertain outcome because of a lack of information about current site conditions, historical disturbance levels, effects of landscape alterations on site development, unpredictable trajectories or patterns of ecosystem structural development, and many other factors. A poor understanding of the factors that control the development and dynamics of a system, such as hydrology, salinity, wave energies, can also lead to an unintended outcome. Finally, lack of experience in restoring certain types of systems (e.g., rare or very fragile habitats) or systems in highly modified situations (e.g., highly urbanized estuaries) makes project outcomes uncertain. Because of these uncertainties, project costs can rise dramatically in an attempt to come closer to project goals. All of the potential sources of error can be addressed to a certain degree through adaptive management. The first step is admitting that these uncertainties can exist, and addressing as many of the uncertainties with planning and directed research prior to implementing the project. The second step is to evaluate uncertainties through hypothesis-driven experiments during project implementation. The third step is to use the monitoring program to evaluate and adjust the project as needed to improve the probability of the project to reach is goal. The fourth and final step is to use the information gained in the project to improve future projects. A framework that includes a clear goal statement, a conceptual model, and an evaluation framework can help in this adaptive restoration process. Projects and programs vary in their application of adaptive management in restoration, and it is very difficult to be highly prescriptive in applying adaptive management to projects that necessarily vary widely in scope, goal, ecosystem characteristics, and uncertainties. Very large ecosystem restoration programs in the Mississippi River delta (Coastal Wetlands Planning, Protection, and Restoration

  14. Evaluating Stream Restoration Projects: What Do We Learn from Monitoring?

    Zan Rubin

    2017-02-01

    Full Text Available Two decades since calls for stream restoration projects to be scientifically assessed, most projects are still unevaluated, and conducted evaluations yield ambiguous results. Even after these decades of investigation, do we know how to define and measure success? We systematically reviewed 26 studies of stream restoration projects that used macroinvertebrate indicators to assess the success of habitat heterogeneity restoration projects. All 26 studies were previously included in two meta-analyses that sought to assess whether restoration programs were succeeding. By contrast, our review focuses on the evaluations themselves, and asks what exactly we are measuring and learning from these evaluations. All 26 studies used taxonomic diversity, richness, or abundance of invertebrates as biological measures of success, but none presented explicit arguments why those metrics were relevant measures of success for the restoration projects. Although changes in biodiversity may reflect overall ecological condition at the regional or global scale, in the context of reach-scale habitat restoration, more abundance and diversity may not necessarily be better. While all 26 studies sought to evaluate the biotic response to habitat heterogeneity enhancement projects, about half of the studies (46% explicitly measured habitat alteration, and 31% used visual estimates of grain size or subjectively judged ‘habitat quality’ from protocols ill-suited for the purpose. Although the goal of all 26 projects was to increase habitat heterogeneity, 31% of the studies either sampled only riffles or did not specify the habitats sampled. One-third of the studies (35% used reference ecosystems to define target conditions. After 20 years of stream restoration evaluation, more work remains for the restoration community to identify appropriate measures of success and to coordinate monitoring so that evaluations are at a scale capable of detecting ecosystem change.

  15. 78 FR 2685 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental...

    2013-01-14

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental Assessment AGENCY: Office of the Assistant Secretary... assessment for the East Hobble Creek Restoration Project is available for public review and comment. The...

  16. Pacific Lamprey Research and Restoration Project : Annual Report 2001.

    Close, David A.

    2002-11-01

    Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993; Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers, thus effecting larval recruitment in the basin. Adult pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River. In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River. To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2001.

  17. Projecting the success of plant restoration with population viability analysis

    Bell, T.J.; Bowles, M.L.; McEachern, A.K.; Brigham, C.A.; Schwartz, M.W.

    2003-01-01

    Conserving viable populations of plant species requires that they have high probabilities of long-term persistence within natural habitats, such as a chance of extinction in 100 years of less than 5% (Menges 1991, 1998; Brown 1994; Pavlik 1994; Chap. 1, this Vol.). For endangered and threatened species that have been severely reduces in range and whose habitats have been fragmented, important species conservation strategies may include augmenting existing populations or restoring new viable populations (Bowles and Whelan 1994; Chap. 2, this Vol.). Restoration objectives may include increasing population numbers to reduce extinction probability, deterministic manipulations to develop a staged cohort structure, or more complex restoration of a desired genetic structure to allow outcrossing or increase effective population size (DeMauro 1993, 1994; Bowles et al. 1993, 1998; Pavlik 1994; Knapp and Dyer 1998; Chap. 2, this Vol.). These efforts may require translocation of propagules from existing (in situ) populations, or from ex situ botanic gardens or seed storage facilities (Falk et al. 1996; Guerrant and Pavlik 1998; Chap. 2, this Vol.). Population viability analysis (PVA) can provide a critical foundation for plant restoration, as it models demographic projections used to evaluate the probability of population persistence and links plant life history with restoration strategies. It is unknown how well artificially created populations will meet demographic modeling requirements (e.g., due to artificial cohort transitions) and few, if any, PVAs have been applied to restorations. To guide application of PVA to restored populations and to illustrate potential difficulties, we examine effects of planting different life stages, model initial population sizes needed to achieve population viability, and compare demographic characteristics between natural and restored populations. We develop and compare plant population restoration viability analysis (PRVA) case studies of

  18. Emergency Fish Restoration Project; Final Report 2002.

    LeCaire, Richard

    2003-03-01

    Lake Roosevelt is a 151-mile impoundment created by the construction of Grand Coulee Dam during the early 1940's. The construction of the dam permanently and forever blocked the once abundant anadromous fish runs to the upper Columbia Basin. Since the construction of Grand Coulee Dam in 1943 and Chief Joseph Dam in 1956 this area is known as the blocked area. The blocked area is totally dependant upon resident fish species to provide a subsistence, recreational and sport fishery. The sport fishery of lake Roosevelt is varied but consists mostly of Rainbow trout (Oncorhynchus mykiss), Kokanee salmon (Oncorhynchus nerka), Walleye (Stizostedion vitreum) Small mouth bass (Micropterus dolomieui) and white sturgeon (Acipenser transmontanus). Currently, Bonneville Power Administration funds and administers two trout/kokanee hatcheries on Lake Roosevelt. The Spokane Tribe of Indians operates one hatchery, the Washington Department of Fish and Wildlife the other. In addition to planting fish directly into Lake Roosevelt, these two hatcheries also supply fish to a net pen operation that also plants the lake. The net pen project is administered by Bonneville Power funded personnel but is dependant upon volunteer labor for daily feeding and monitoring operations. This project has demonstrated great success and is endorsed by the Colville Confederated Tribes, the Spokane Tribe of Indians, the Washington Department of Fish and Wildlife, local sportsmen associations, and the Lake Roosevelt Forum. The Lake Roosevelt/Grand Coulee Dam area is widely known and its diverse fishery is targeted by large numbers of anglers annually to catch rainbow trout, kokanee salmon, small mouth bass and walleye. These anglers contribute a great deal to the local economy by fuel, grocery, license, tackle and motel purchases. Because such a large portion of the local economy is dependant upon the Lake Roosevelt fishery and tourism, any unusual operation of the Lake Roosevelt system may have a

  19. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2004

    Diefenderfer, Heida L.; Roegner, Curtis; Thom, Ronald M.; Dawley, Earl M.; Whiting, Allan H.; Johnson, Gary E.; Sobocinski, Kathryn L.; Anderson, Michael G.; Ebberts, Blaine

    2005-12-15

    The restoration of wetland salmon habitat in the tidal portion of the Columbia River is occurring at an accelerating pace and is anticipated to improve habitat quality and effect hydrological reconnection between existing and restored habitats. Currently multiple groups are applying a variety of restoration strategies in an attempt to emulate historic estuarine processes. However, the region lacks both a standardized means of evaluating the effectiveness of individual projects as well as methods for determining the cumulative effects of all restoration projects on a regional scale. This project is working to establish a framework to evaluate individual and cumulative ecosystem responses to restoration activities in order to validate the effectiveness of habitat restoration activities designed to benefit salmon through improvements to habitat quality and habitat opportunity (i.e. access) in the Columbia River from Bonneville Dam to the ocean. The review and synthesis of approaches to measure the cumulative effects of multiple restoration projects focused on defining methods and metrics of relevance to the CRE, and, in particular, juvenile salmon use of this system. An extensive literature review found no previous study assessing the cumulative effects of multiple restoration projects on the fundamental processes and functions of a large estuarine system, although studies are underway in other large land-margin ecosystems including the Florida Everglades and the Louisiana coastal wetlands. Literature from a variety of scientific disciplines was consulted to identify the ways that effects can accumulate (e.g., delayed effects, cross-boundary effects, compounding effects, indirect effects, triggers and thresholds) as well as standard and innovative tools and methods utilized in cumulative effects analyses: conceptual models, matrices, checklists, modeling, trends analysis, geographic information systems, carrying capacity analysis, and ecosystem analysis. Potential

  20. The Role of Anthropogenic Stratigraphy in River Restoration Projects

    Evans, J. E.; Webb, L. D.

    2012-12-01

    As part of a river restoration project and removal of a low-head dam on the Ottawa River (northwestern Ohio and southeastern Michigan) in 2007, a longer-term project was initiated to assess anthropogenic changes of the Ottawa River fluvial system. A composite stratigraphic section 4.5 m in length was constructed by stratigraphic correlation from three trenches up to 2.5 m in depth and 14 vibracores up to 2.5 m in length, all within a small region (tires, intact or pieces of glass bottles, and one horizon of displaced railroad ties. Age control for the composite section is provided by 4 14C dates, 6 OSL dates, and one bottle with a date stamp. Two prominent flood horizons are indicated in multiple trenches or cores, and identified as the historic floods of 1913 and 1959. The data show the following major changes in the fluvial system over time: (1) prior to approximately 5 Ka, the river system was transporting mineral-rich sediment and formed meandering point-bar sequences approximately 1.5 m thick; (2) between approximately 5 Ka and 200 YBP, the river system was transporting organic-rich sediment (i.e., blackwater stream) bordered by riparian wetlands accumulating peat (part of the regional "Great Black Swamp" discovered by settlers from eastern North America); (3) between approximately 200 YBP and the early 1960s the river system was transporting mineral-rich sediment (i.e., brownwater stream), probably sourced from extensive land clearance for agriculture, which backfilled and overtopped the previous riparian wetlands and produced an series of thin channel fills interpreted as rapidly shifting avulsional channels; (4) since the early 1960s, sediment supply has exceeded sediment conveyance capacity, leading to vertical aggradation of approximately 1.7 m, creating the fill-terrace morphology evident today; and (5) overlapping with the previous stage, channel incision and lateral channel migration has produced a fluvial system dominated by bank erosion, logjams due

  1. MULTIPLE PROJECT MANAGEMENT IN THE CONSTRUCTION INDSUTRY

    Luciana Hazin Alencar

    2010-06-01

    Full Text Available The field of project management has historically focused on the administration of one project at a time, a focus that is insufficient given the growing need for organizations to manage multiple projects simultaneously. The requirements of Multiple Project Management (MPM involves demands and practices that are different from those of single projects. MPM poses a special need for coordination of shared resources across multiple projects in a way that can maintain the firm’s strategic focus and facilitate effective decision making. The construction industry is noteworthy for its frequent need for the management of multiple projects. This paper offers a review of the last five years of indexed literature related to multiple project management in the construction industry, identifies gaps and suggests promising new avenues of inquiry.

  2. Restoration of γ-ray multiplicity distributions from experiments with low efficiency multiplicity filters

    Bellia, G.; Del Zoppo, A.; Migneco, E.; Russo, G.; Istituto Nazionale di Fisica Nucleare, Catania

    1984-01-01

    The restoration of γ-ray multiplicity distributions from experimental p-fold coincidence distributions is discussed. It is shown that the restoration of the multiplicity from measurements with low total detection efficiency is an 'incorrectly posed problem'. While in the literature the analysis of the experimental data has been attempted only in terms of the lowest central moments of the multiplicity distribution, in this paper an unfolding method based on the minimization of the directioned discrepancies in the probability space is used. The method is found to work very well even if the total efficiency Ω <= 0.1. Realistic tests and a comparison with the usual method of analysis are presented. (orig.)

  3. Mummy Restoration Project Among the Anga of Papua New Guinea.

    Beckett, Ronald G; Nelson, Andrew J

    2015-06-01

    We report on a unique Mummy restoration project among the anga of papua new guinea. Moimango was a village leader who had gone through the smoked body mummification process about 50 years ago. His smoked body has been displayed, alongside other ancestors, on a cliff niche gallery 308 m (1011 feet) above Koke Village. Although somewhat protected by an overhang, Moimango suffered a great deal of deterioration as he has been unprotected and exposed to the elements. The goals of our 2010 expedition to Koke Village was to assess the efficacy of restoration efforts applied to Moimango initiated by the authors and villagers of Koke in 2008. The restoration process used materials native to the local jungles. We examined Moimango for additional restoration challenges that may have arisen since the 2008 expedition. We discovered that many of the restoration techniques developed and applied in 2008 held up well. We found that the anatomical supports developed from native tapa and kumaka sap were still in place and effective, as well as our lichen eradication method of a suca slurry applied in 2008. Of particular importance was the stability of Moimago's head, which prior to restoration, was held in place by only the mummified muscle and integument of the lateral and posterior neck region. Endoscopic evaluation demonstrated disarticulated C1 and C2 vertebrae. New restoration challenges included construction of a new display chair, realignment and securing of the mandible, replacing and securing a loose tooth, repatching, and recoating with ritualistic red ochre clay. © 2015 Wiley Periodicals, Inc.

  4. Pacific Lamprey Research and Restoration Project, Annual Report 2002.

    Close, David; Aronsuu, Kimmo; Jackson, Aaron

    2003-07-01

    Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993, Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers (Moser et al. 2002), thus effecting larval recruitment in the basin (Moser and Close in press). Adult Pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River (Close and Jackson 2001). In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River (Close 1999). To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2002.

  5. How to scientifically assess a restoration project: a case study

    Alvarez de Buergo, M.; Fort, R.; Freire, D. M.; Lopez-Arce, P.; Vazquez-Calvo, C.

    2012-04-01

    Commonly, it is said that there is lack of communication among scientists, conservators, restorers, project managers and architects. But sometimes this communication flows, and we can find enormous benefits from and for all the participating agents. This is the case we present in this work, in which technical agents in charge of the restoration of a building, asked for some scientific advice to perform the restoration of a heritage building. The results were successful and fantastic for both of them, in terms of one part asking for consultation and the other answering to the demands and resolving real problems. This is the case of a marvellous Renaissance building (Medinaceli Dukes palace, 15th-16th centuries) in the central area of Spain (Cogolludo, Guadalajara). Focused on the restoration project, we were asked for consultancy on how to solve matters like the assessment of the already fixed in project cleaning method for the stone façades, the efficacy and durability methods for some conservation products to be applied, the presence or not of a patina on the stone; the viability of using some restoration mortars, and the origin of some efflorescences that came out just after placed in the building a restoration rendering mortar. Responses to these matters were answered by performing tests both in the lab and on site in the building. The efficiency and effects on stone of the blasting cleaning method was assessed by first analysing the nature and thickness of the surface deposits to be removed (SEM-EDS analyses); secondly, roughness and colour measurements were performed, and thirdly, SEM-EDS analyses were carried out again to determine whether the cleaning method was able to remove part of the surface deposits, completely, or even part of the stone substrate. Some conservation products were tested on stone specimens, both their efficacy and their durability, concluding that it was better not to apply any of them. A patina was found on the stone façade under SEM

  6. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2007

    Johnson, Gary E.; Diefenderfer, Heida L.; Borde, Amy B.; Dawley, Earl M.; Ebberts, Blaine D.; Putman, Douglas A.; Roegner, G. C.; Russell, Micah; Skalski, John R.; Thom, Ronald M.; Vavrinec, John

    2008-10-01

    The goal of this multi-year study (2004-2010) is to develop a methodology to evaluate the cumulative effects of multiple habitat restoration projects intended to benefit ecosystems supporting juvenile salmonids in the lower Columbia River and estuary. Literature review in 2004 revealed no existing methods for such an evaluation and suggested that cumulative effects could be additive or synergistic. Field research in 2005, 2006, and 2007 involved intensive, comparative studies paired by habitat type (tidal swamp vs. marsh), trajectory (restoration vs. reference site), and restoration action (tide gate vs. culvert vs. dike breach). The field work established two kinds of monitoring indicators for eventual cumulative effects analysis: core and higher-order indicators. Management implications of limitations and applications of site-specific effectiveness monitoring and cumulative effects analysis were identified.

  7. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Lower Columbia River and Estuary, 2009

    Johnson, Gary E.; Diefenderfer, Heida L.; Borde, Amy B.; Bryson, Amanda J.; Cameron, April; Coleman, Andre M.; Corbett, C.; Dawley, Earl M.; Ebberts, Blaine D.; Kauffman, Ronald; Roegner, G. Curtis; Russell, Micah T.; Silva, April; Skalski, John R.; Thom, Ronald M.; Vavrinec, John; Woodruff, Dana L.; Zimmerman, Shon A.

    2010-10-26

    This is the sixth annual report of a seven-year project (2004 through 2010) to evaluate the cumulative effects of habitat restoration actions in the lower Columbia River and estuary (LCRE). The project, called the Cumulative Effects Study, is being conducted for the U.S. Army Corps of Engineers Portland District (USACE) by the Marine Sciences Laboratory of the Pacific Northwest National Laboratory (PNNL), the Pt. Adams Biological Field Station of the National Marine Fisheries Service (NMFS), the Columbia River Estuary Study Taskforce (CREST), and the University of Washington. The goal of the Cumulative Effects Study is to develop a methodology to evaluate the cumulative effects of multiple habitat restoration projects intended to benefit ecosystems supporting juvenile salmonids in the 235-km-long LCRE. Literature review in 2004 revealed no existing methods for such an evaluation and suggested that cumulative effects could be additive or synergistic. From 2005 through 2009, annual field research involved intensive, comparative studies paired by habitat type (tidal swamp versus marsh), trajectory (restoration versus reference site), and restoration action (tidegate replacement vs. culvert replacement vs. dike breach).

  8. Subtidal Bathymetric Changes by Shoreline Armoring Removal and Restoration Projects

    Wallace, J.

    2016-12-01

    The Salish Sea, a region with a diverse coastline, is altered by anthropogenic shoreline modifications such as seawalls. In recent years, local organizations have moved to restore these shorelines. Current research monitors the changes restoration projects have on the upper beach, lower beach, and intertidal, however little research exists to record possible negative effects on the subtidal. The purpose of this research is to utilize multibeam sonar bathymetric data to analyze possible changes to the seafloor structure of the subtidal in response to shoreline modification and to investigate potential ecosystem consequences of shoreline alteration. The subtidal is home to several species including eelgrass (Zostera marina). Eelgrass is an important species in Puget Sound as it provides many key ecosystem functions including providing habitat for a wide variety of organisms, affecting the physics of waves, and sediment transport in the subtidal. Thus bathymetric changes could impact eelgrass growth and reduce its ability to provide crucial ecosystem services. Three Washington state study sites of completed shoreline restoration projects were used to generate data from areas of varied topographic classification, Seahurst Park in Burien, the Snohomish County Nearshore Restoration Project in Everett, and Cornet Bay State Park on Whidbey Island. Multibeam sonar data was acquired using a Konsberg EM 2040 system and post-processed in Caris HIPS to generate a base surface of one-meter resolution. It was then imported into the ArcGIS software suite for the generation of spatial metrics. Measurements of change were calculated through a comparison of historical and generated data. Descriptive metrics generated included, total elevation change, percent area changed, and a transition matrix of positive and negative change. Additionally, pattern metrics such as, surface roughness, and Bathymetric Position Index (BPI), were calculated. The comparison of historical data to new data

  9. Environmental Restoration Disposal Facility (Project W-296) Safety Assessment

    Armstrong, D.L.

    1994-08-01

    This Safety Assessment is based on information derived from the Conceptual Design Report for the Environmental Restoration Disposal Facility (DOE/RL 1994) and ancillary documentation developed during the conceptual design phase of Project W-296. The Safety Assessment has been prepared to support the Solid Waste Burial Ground Interim Safety Basis document. The purpose of the Safety Assessment is to provide an evaluation of the design to determine if the process, as proposed, will comply with US Department of Energy (DOE) Limits for radioactive and hazardous material exposures and be acceptable from an overall health and safety standpoint. The evaluation considered affects on the worker, onsite personnel, the public, and the environment

  10. Environmental Restoration Disposal Facility (Project W-296) Safety Assessment

    Armstrong, D.L.

    1994-08-01

    This Safety Assessment is based on information derived from the Conceptual Design Report for the Environmental Restoration Disposal Facility (DOE/RL 1994) and ancillary documentation developed during the conceptual design phase of Project W-296. The Safety Assessment has been prepared to support the Solid Waste Burial Ground Interim Safety Basis document. The purpose of the Safety Assessment is to provide an evaluation of the design to determine if the process, as proposed, will comply with US Department of Energy (DOE) Limits for radioactive and hazardous material exposures and be acceptable from an overall health and safety standpoint. The evaluation considered affects on the worker, onsite personnel, the public, and the environment.

  11. Technology integration project: Environmental Restoration Technologies Department Sandia National Laboratories

    Williams, C.V.; Burford, T.D.

    1996-08-01

    Sandia National Laboratories Environmental Restoration Technologies Department is developing environmental restoration technologies through funding form the US Department of Energy's (DOE's) Office of Science and Technology. Initially, this technology development has been through the Mixed Waste Landfill Integrated Demonstration (MWLID). It is currently being developed through the Contaminant Plume containment and Remediation Focus Area, the Landfill Stabilization Focus Area, and the Characterization, Monitoring, and Sensor Cross-Cutting Program. This Technology Integration Project (TIP) was responsible for transferring MWLID-developed technologies for routine use by environmental restoration groups throughout the DOE complex and commercializing these technologies to the private sector. The MWLID's technology transfer/commercialization successes were achieved by involving private industry in development, demonstration, and technology transfer/commercialization activities; gathering and disseminating information about MWLID activities and technologies; and promoting stakeholder and regulatory involvement. From FY91 through FY95, 30 Technical Task Plans (TTPs) were funded. From these TTPs, the MWLID can claim 15 technology transfer/commercialization successes. Another seven technology transfer/commercialization successes are expected. With the changeover to the focus areas, the TIP continued the technology transfer/commercialization efforts begun under the MWLID

  12. Technology integration project: Environmental Restoration Technologies Department Sandia National Laboratories

    Williams, C.V.; Burford, T.D. [Sandia National Labs., Albuquerque, NM (United States). Environmental Restoration Technologies; Allen, C.A. [Tech Reps, Inc., Albuquerque, NM (United States)

    1996-08-01

    Sandia National Laboratories Environmental Restoration Technologies Department is developing environmental restoration technologies through funding form the US Department of Energy`s (DOE`s) Office of Science and Technology. Initially, this technology development has been through the Mixed Waste Landfill Integrated Demonstration (MWLID). It is currently being developed through the Contaminant Plume containment and Remediation Focus Area, the Landfill Stabilization Focus Area, and the Characterization, Monitoring, and Sensor Cross-Cutting Program. This Technology Integration Project (TIP) was responsible for transferring MWLID-developed technologies for routine use by environmental restoration groups throughout the DOE complex and commercializing these technologies to the private sector. The MWLID`s technology transfer/commercialization successes were achieved by involving private industry in development, demonstration, and technology transfer/commercialization activities; gathering and disseminating information about MWLID activities and technologies; and promoting stakeholder and regulatory involvement. From FY91 through FY95, 30 Technical Task Plans (TTPs) were funded. From these TTPs, the MWLID can claim 15 technology transfer/commercialization successes. Another seven technology transfer/commercialization successes are expected. With the changeover to the focus areas, the TIP continued the technology transfer/commercialization efforts begun under the MWLID.

  13. The optimized baseline project: Reinventing environmental restoration at Hanford

    Goodenough, J.D.; Janaskie, M.T.; Kleinen, P.J.

    1994-01-01

    The U.S. Department of Energy Richland Operations Office (DOE-RL) is using a strategic planning effort (termed the Optimized Baseline Project) to develop a new approach to the Hanford Environmental Restoration program. This effort seeks to achieve a quantum leap improvement in performance through results oriented prioritization of activities. This effort was conducted in parallel with the renegotiation of the Tri-Party Agreement and provided DOE with an opportunity to propose innovative initiatives to promote cost effectiveness, accelerate progress in the Hanford Environmental Restoration Program and involve stakeholders in the decision-making process. The Optimized Baseline project is an innovative approach to program planning and decision-making in several respects. First, the process is a top down, value driven effort that responds to values held by DOE, the regulatory community and the public. Second, planning is conducted in a way that reinforces the technical management process at Richland, involves the regulatory community in substantive decisions, and includes the public. Third, the Optimized Baseline Project is being conducted as part of a sitewide Hanford initiative to reinvent Government. The planning process used for the Optimized Baseline Project has many potential applications at other sites and in other programs where there is a need to build consensus among diverse, independent groups of stakeholders and decisionmakers. The project has successfully developed and demonstrated an innovative approach to program planning that accelerates the pace of cleanup, involves the regulators as partners with DOE in priority setting, and builds public understanding and support for the program through meaningful opportunities for involvement

  14. The Carolina Bay Restoration Project - Final Report 2000-2006.

    Barton, Christopher

    2007-12-15

    A Wetlands Mitigation Bank was established at SRS in 1997 as a compensatory alternative for unavoidable wetland losses. Prior to restoration activities, 16 sites included in the project were surveyed for the SRS Site Use system to serve as a protective covenant. Pre-restoration monitoring ended in Fall 2000, and post restoration monitoring began in the Winter/Spring of 2001. The total interior harvest in the 16 bays after harvesting the trees was 19.6 ha. The margins in the opencanopy, pine savanna margin treatments were thinned. Margins containing areas with immature forested stands (bay 5184 and portions of bay 5011) were thinned using a mechanical shredder in November 2001. Over 126 hectares were included in the study areas (interior + margin). Planting of two tree species and the transplanting of wetland grass species was successful. From field surveys, it was estimated that approximately 2700 Nyssa sylvatica and 1900 Taxodium distichum seedlings were planted in the eight forested bays resulting in an average planting density of ≈ 490 stems ha-1. One hundred seedlings of each species per bay (where available) were marked to evaluate survivability and growth. Wetland grass species were transplanted from donor sites on SRS to plots that ranged in size from 100 – 300 m2, depending on wetland size. On 0.75 and 0.6 meter centers, respectively, 2198 plugs of Panicum hemitomon and 3021 plugs Leersia hexandra were transplanted. New shoots originating from the stumps were treated with a foliar herbicide (Garlon® 4) during the summer of 2001 using backpack sprayers. Preliminary information from 2000-2004 regarding the hydrologic, vegetation and faunal response to restoration is presented in this status report.

  15. Moses Lake Fishery Restoration Project : FY 1999 Annual Report.

    None given

    2000-12-01

    The Moses Lake Project consists of 3 phases. Phase 1 is the assessment of all currently available physical and biological information, the collection of baseline biological data, the formulation of testable hypotheses, and the development of a detailed study plan to test the hypotheses. Phase 2 is dedicated to the implementation of the study plan including data collection, hypotheses testing, and the formulation of a management plan. Phase 3 of the project is the implementation of the management plan, monitoring and evaluation of the implemented recommendations. The project intends to restore the failed recreational fishery for panfish species (black crappie, bluegill and yellow perch) in Moses Lake as off site mitigation for lost recreational fishing opportunities for anadromous species in the upper Columbia River. This report summarizes the results of Phase 1 investigations and presents the study plan directed at initiating Phase 2 of the project. Phase 1of the project culminates with the formulation of testable hypotheses directed at investigating possible limiting factors to the production of panfish in Moses Lake. The limiting factors to be investigated will include water quality, habitat quantity and quality, food limitations, competition, recruitment, predation, over harvest, environmental requirements, and the physical and chemical limitations of the system in relation to the fishes.

  16. Digital collection of aerial photographs from the Common Murre Restoration Project, 1997 (NODC Accession 0037159)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Common Murre Restoration Project is a comprehensive seabird restoration effort aimed at enhancing depleted seabird populations in central California,...

  17. Digital collection of aerial photographs from the Common Murre Restoration Project, 2005 (NODC Accession 0057025)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Common Murre Restoration Project is a comprehensive seabird restoration effort aimed at enhancing depleted seabird populations in central California,...

  18. Digital collection of aerial photographs from the Common Murre Restoration Project, 1998 (NODC Accession 0037160)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Common Murre Restoration Project is a comprehensive seabird restoration effort aimed at enhancing depleted seabird populations in central California,...

  19. 77 FR 65167 - Blacksmith Ecological Restoration Project, Eldorado National Forest, Placer and El Dorado...

    2012-10-25

    ... DEPARTMENT OF AGRICULTURE Forest Service Blacksmith Ecological Restoration Project, Eldorado... comments to 7600 Wentworth Springs Rd., Georgetown, CA 95634 Attention: Blacksmith Ecological Restoration... (PSD). In preparation for prescribed fire, perimeter line construction would be needed where roads...

  20. Digital collection of aerial photographs from the Common Murre Restoration Project, 1996 (NODC Accession 0015544)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Common Murre Restoration Project is a comprehensive seabird restoration effort aimed at enhancing depleted seabird populations in central California,...

  1. South Bay Salt Pond Tidal Marsh Restoration at Pond A17 Project

    Information about the SFBWQP South Bay Salt Pond Tidal Marsh Restoration at Pond A17 Project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  2. South Bay Salt Pond Restoration Project: Planning Phase at Southern Eden Landing

    This project will complete the design and permits to restore 1,300 acres of tidal wetlands, provide 3.5 miles shoreline protection, and accelerate wetlands restoration at the Eden Landing Ecological Reserve.

  3. Digital collection of aerial photographs from the Common Murre Restoration Project, 2006 (NODC Accession 0058096)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Common Murre Restoration Project is a comprehensive seabird restoration effort aimed at enhancing depleted seabird populations in central California,...

  4. Multiple Wins, Multiple Organizations—How to Manage Institutional Interaction in Financing Forest Landscape Restoration (FLR

    Astrid Carrapatoso

    2018-03-01

    Full Text Available By restoring forest ecosystems and fostering resilient and sustainable land use practices, Forest Landscape Restoration (FLR contributes to climate change mitigation, adaptation and sustainable development as well as the protection of biological diversity and combating desertification. This integrative approach provides the opportunity for multiple wins, but it necessitates the management of complex institutional interactions arising from the involvement of multiple international organizations. Focusing on the pivotal aspect of financing, this article surveys the landscape of public international institutions supporting FLR and analyzes the effectiveness of existing mechanisms of inter-institutional coordination and harmonization. Methodologically, our research is based on a document analysis, complemented by participant observation of the two Bonn Climate Change Conferences in May and November 2017 as well as the Global Landscapes Forum in December 2017. We find that financial institutions have established fairly effective rules for the management of positive and negative externalities through the introduction of co-benefits and safeguards. The fact that each institution has their own safeguards provisions, however, leads to significant transaction costs for recipient countries. In the discussion, we thus recommend that institutions should refrain from an unnecessary duplication of standards and focus on best practice.

  5. Project No. 10 - Partial restoration of Ignalina NPP territory

    2000-01-01

    At present Ignalina NPP territory makes a total of 2544 ha of land. Due to termination of construction activity development and due to the decision taken to shutdown unit 1 the need in such a territory fell off. For normal and safe operation of Ignalina NPP 1440 ha is enough, including 1237 ha for of Ignalina NPP administrative area and 203 ha for auxiliary objects. Ignalina NPP will have to rearrange territory, forestry that was damaged during the construction activities of the plant and to restore the damaged farmlands and to pass the rearranged forestry that belonged to the Ignalina NPP to the Ministry of Forestry. The total estimated cost of the project is about 1.042 M EURO

  6. Multiple CMS-restorer gene polymorphism in gynodioecious Plantago coronopus

    Damme, van J.M.M.; Hundscheid, M.P.J.; Ivanovic, S.; Koelewijn, H.P.

    2004-01-01

    The mode of inheritance of the male sterility trait is crucial for understanding the evolutionary dynamics of the sexual system gynodioecy, which is the co-occurrence of female and hermaphrodite plants in natural populations. Both cytoplasmic (CMS) and nuclear (restorer) genes are known to be

  7. Addressing elder abuse: the Waterloo restorative justice approach to elder abuse project.

    Groh, Arlene; Linden, Rick

    2011-04-01

    The Community Care Access Centre (CCAC) of Waterloo Region, in partnership with a number of other social service agencies, designed and implemented a restorative justice model applicable to older adults who have been abused by an individual in a position of trust. The project was very successful in building partnerships, as many community agencies came together to deal with the problem of elder abuse. The program also raised the profile of elder abuse in the community. However, despite intensive efforts, referrals to the restorative justice program were quite low. Because of this, the program moved to a new organizational model, the Elder Abuse Response Team (EART), which has retained the guiding philosophy of restorative justice but has broadened the mandate. The team has evolved into a conflict management system that has multiple points of entry for cases and multiple options for dealing with elder abuse. The team has developed a broad range of community partners who can facilitate referrals to the EART and also can help to provide an individualized response to each case. The transition to the EART has been successful, and the number of referrals has increased significantly. Copyright © Taylor & Francis Group, LLC

  8. Results From a Channel Restoration Project: Hydraulic Design Considerations

    Karle, K.F.; Densmore, R.V.; ,

    2001-01-01

    Techniques for the hydraulic restoration of placer-mined streams and floodplains were developed in Denali National Park and Preserve, Alaska. The two-year study at Glen Creek focused on a design of stream and floodplain geometry using hydraulic capacity and shear stress equations. Slope and sinuosity values were based on regional relationships. Design requirements included a channel capacity for a bankfull discharge and a floodplain capacity for a 1.5- to 100-year discharge. Several bio-engineering techniques using alder and willow, including anchored brush bars, streambank hedge layering, seedlings, and cuttings, were tested to dissipate floodwater energy and encourage sediment deposition until natural revegetation stabilized the new floodplains. Permanently monumented cross-sections installed throughout the project site were surveyed every one to three years. Nine years after the project began, a summer flood caused substantial damage to the channel form, including a change in width/depth ratio, slope, and thalweg location. Many of the alder brush bars were heavily damaged or destroyed, resulting in significant bank erosion. This paper reviews the original hydraulic design process, and describes changes to the channel and floodplain geometry over time, based on nine years of cross-section surveys.

  9. Accelerated Cure Project for Multiple Sclerosis

    ... questions and enable an era of optimized MS treatment. Read more... The Accelerated Cure Project for MS is a non-profit, 501(c)(3) tax-exempt organization whose mission is to accelerate efforts toward a cure for multiple sclerosis by rapidly advancing research that determines its causes ...

  10. 75 FR 5765 - NOAA Coastal and Marine Habitat Restoration Project Supplemental Funding

    2010-02-04

    ...-02] RIN 0648-ZC05 NOAA Coastal and Marine Habitat Restoration Project Supplemental Funding AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration (NOAA), Commerce. ACTION: Notice of supplemental funding for NOAA Coastal and Marine Habitat Restoration Projects. SUMMARY...

  11. 76 FR 46721 - Salmon-Challis National Forest, ID; Upper North Fork HFRA Ecosystem Restoration Project...

    2011-08-03

    ...-Challis National Forest, ID; Upper North Fork HFRA Ecosystem Restoration Project Environmental Impact... improve the health of the ecosystem and reach the desired future condition. DATES: Comments concerning the... Ecosystem Restoration Project EIS, P.O. Box 180, 11 Casey Rd., North Fork, ID 83466. Comments may also be...

  12. Nuclear criticality safety program for environmental restoration projects

    Marble, R.C.; Brown, T.D.

    1994-05-01

    The Fernald Environmental Management Project (FEMP), formerly known as the Feed Materials Production Center (FMPC), is located on a 1050 acre site approximately twenty miles northwest of Cincinnati, Ohio. The production area of the site covers approximately 136 acres in the central portion of the site. Surrounding the core production area is a buffer consisting of leased grazing land, reforested land, and unused areas. The uranium processing facility was designed and constructed in the early 1950s. During the period from 1952 to 1989 the site produced uranium feed material and uranium products used in the United States weapons complex. Production at the site ended in 1989, when the site was shut down for what was expected to be a short period of time. However, the FUTC was permanently shut down in 1991, and the site's mission was changed from production to environmental restoration. The objective of this paper is to give an update on activities at the Fernald Site and to describe the Nuclear Criticality Safety issues that are currently being addressed

  13. From repairing the damaged landscape to restoration project

    Céline Granjou

    2010-10-01

    Full Text Available The study adopts an empirical sociological approach to analyse how the objectives behind the revegetation of ski trails and runs in the French alpine resort of Alpe d’Huez have evolved since the 1970s. A revegetation programme was first introduced to repair the scars left by the works conducted to equip the resort with infrastructures, and then, over time, it became a more complex restoration project. At first, revegetation techniques were developed to fight soil erosion, but soon also became associated with the idea of “turning the mountain green again”. Now, 40 years later, revegetation is aimed at restoring both a natural ecosystem and a cultural landscape. The ski resort’s managers, local farmers, technicians, and those conducting research in the area share a common desire to promote autochthony, which in some cases runs the risk of reproducing folklore. Far from adopting an overriding ethical perspective, the study suggests that the area’s physical characteristics, specific history and configuration of local actors have shaped and continue to shape both the manner in which ecological restoration is implemented, through political choices and technical decisions, and the debates it gives rise to. The study concludes by examining the specificity of the findings for Alpe d’Huez and discussing their validity for other alpine ski resorts.A partir d’une approche sociologique empirique, ce texte propose une analyse de la mise en œuvre de la revégétalisation sur la station de l’Alpe d’Huez depuis les années 1970. Il montre comment la revégétalisation est passée d’un objectif de réparation des cicatrices provoquées par les aménagements à une entreprise plus complexe de restauration. S’il s’agissait au départ de répondre à un objectif technique de lutte contre l’érosion, la revégétalisation a pris rapidement une tournure paysagère (reverdissement ; elle a ensuite été pensée dans une perspective de

  14. Wind River Watershed Restoration Project, Segment II, 2000-2002 Annual Report.

    Bair, Brian; Olegario, Anthony; Powers, Paul

    2002-06-01

    This document represents work conducted as part of the Wind River Watershed Restoration Project during its second year of funding through the Bonneville Power Administration (BPA). The project is a comprehensive effort involving public and private entities seeking to restore water quality and fishery resources in the basin through cooperative actions. Project elements include coordination, watershed assessment, restoration, monitoring, and education. Entities involved with implementing project components are the Underwood Conservation District (UCD), USDA Forest Service (USFS), U.S. Geological Survey - Columbia River Research Lab (USGS-CRRL), and WA Department of Fish & Wildlife (WDFW).

  15. Bridge Creek IMW database - Bridge Creek Restoration and Monitoring Project

    National Oceanic and Atmospheric Administration, Department of Commerce — The incised and degraded habitat of Bridge Creek is thought to be limiting a population of ESA-listed steelhead (Oncorhynchus mykiss). A logical restoration approach...

  16. A visual progression of the Fort Valley Restoration Project treatments using remotely sensed imagery (P-53)

    Joseph E. Crouse; Peter Z. Fule

    2008-01-01

    The landscape surrounding the Fort Valley Experimental Forest in northern Arizona has changed dramatically in the past decade due to the Fort Valley Restoration Project, a collaboration between the Greater Flagstaff Forest Partnership, Coconino National Forest, and Rocky Mountain Research Station. Severe wildfires in 1996 sparked community concern to start restoration...

  17. Hangman Restoration Project Year-End Report FY2008.

    Coeur d' Alene Tribe Department of Natural Resources.

    2008-11-12

    This report covers the main goals of FY2008 from which the Work Elements were derived. The goals and products are listed by heading and the associated work elements are referenced in the text. A list of the FY2008 Work Elements is included as Appendix A. FY2008 witnessed the completion of the hntkwipn Management Plan and the first substantive efforts to restore the important habitats encompassed by the mitigation properties in the Upper Hangman Watershed. Native grasses were planted and germination was evaluated. Also, drain tiles that greatly altered the hydrologic function of the Sheep and Hangman Creek Flood Plains were removed and/or disrupted. Preparation for future restoration efforts were also made in FY2008. Designs were produced for the realignment of Sheep Creek and the decommissioning of seven drainage ditches within hntkwipn. A prioritization plan was drafted that greatly expands the area of focus for restoring native fish population in Hangman Creek.

  18. System Safety Program Plan for Project W-314, tank farm restoration and safe operations

    Boos, K.A.

    1996-01-01

    This System Safety Program Plan (SSPP) outlines the safety analysis strategy for project W-314, ''Tank Farm Restoration and Safe Operations.'' Project W-314 will provide capital improvements to Hanford's existing Tank Farm facilities, with particular emphasis on infrastructure systems supporting safe operation of the double-shell activities related to the project's conceptual Design Phase, but is planned to be updated and maintained as a ''living document'' throughout the life of the project to reflect the current safety analysis planning for the Tank Farm Restoration and Safe Operations upgrades. This approved W-314 SSPP provides the basis for preparation/approval of all safety analysis documentation needed to support the project

  19. Macroinvertebrate communities evaluated prior to and following a channel restoration project in Silver Creek, Blaine County, Idaho, 2001-16

    MacCoy, Dorene E.; Short, Terry M.

    2017-11-22

    The U.S. Geological Survey, in cooperation with Blaine County and The Nature Conservancy, evaluated the status of macroinvertebrate communities prior to and following a channel restoration project in Silver Creek, Blaine County, Idaho. The objective of the evaluation was to determine whether 2014 remediation efforts to restore natural channel conditions in an impounded area of Silver Creek caused declines in local macroinvertebrate communities. Starting in 2001 and ending in 2016, macroinvertebrates were sampled every 3 years at two long-term trend sites and sampled seasonally (spring, summer, and autumn) in 2013, 2015, and 2016 at seven synoptic sites. Trend-site communities were collected from natural stream-bottom substrates to represent locally established macroinvertebrate assemblages. Synoptic site communities were sampled using artificial (multi-plate) substrates to represent recently colonized (4–6 weeks) assemblages. Statistical summaries of spatial and temporal patterns in macroinvertebrate taxonomic composition at both trend and synoptic sites were completed.The potential effect of the restoration project on resident macroinvertebrate populations was determined by comparing the following community assemblage metrics:Total taxonomic richness (taxa richness);Total macroinvertebrate abundance (total abundance);Ephemeroptera, Plecoptera, Trichoptera (EPT) richness;EPT abundance;Simpson’s diversity; andSimpson’s evenness for periods prior to and following restoration.A significant decrease in one or more metric values in the period following stream channel restoration was the basis for determining impairment to the macroinvertebrate communities in Silver Creek.Comparison of pre-restoration (2001–13) and post‑restoration (2016) macroinvertebrate community composition at trend sites determined that no significant decreases occurred in any metric parameter for communities sampled in 2016. Taxa and EPT richness of colonized assemblages at synoptic sites

  20. Great Basin Research and Management Project: Restoring and maintaining riparian ecosystem integrity

    Jeanne C. Chambers

    2000-01-01

    The Great Basin Research and Management Project was initiated in 1994 by the USDA Forest Service, Rocky Mountain Research Station’s Ecology, Paleoecology, and Restoration of Great Basin Watersheds Project to address the problems of stream incision and riparian ecosystem degradation in central Nevada. It is a highly interdisciplinary project that is being conducted in...

  1. Project Gasbuggy well plugging and site restoration plan

    1978-07-01

    The operational plan for conducting the final restoration work at the site of the first U.S. underground nuclear experiment for the stimulation of low-productivity natural gas reservoirs is given. The plan includes well plugging procedures, surface facilities decontamination and removal procedures, radiological guidelines, and environmental considerations

  2. Prairie Restoration Project: Alternatives for Identifying Gifted Students

    Salisbury, Katie E.; Rule, Audrey C.; Vander Zanden, Sarah M.

    2016-01-01

    An authentic, challenging curriculum engaged middle school students from an urban district in exploratory work related to restoring a small prairie at the school. Integrated science-literacy-arts activities were coupled with a system of thinking skills that helped students view issues from different perspectives. Impassioned guest speakers and an…

  3. A Convex Variational Model for Restoring Blurred Images with Multiplicative Noise

    Dong, Yiqiu; Tieyong Zeng

    2013-01-01

    In this paper, a new variational model for restoring blurred images with multiplicative noise is proposed. Based on the statistical property of the noise, a quadratic penalty function technique is utilized in order to obtain a strictly convex model under a mild condition, which guarantees...

  4. Exxon Valdez Oil Spill Restoration Project final report: Monitoring for evaluation of recovery and restoration of injured nearshore resources

    Ballachey, Brenda E.; Bodkin, James L.; Kloecker, Kim; Dean, Tom; Colettie, Heather A

    2015-01-01

    In 2012, we completed three consecutive years of full field sampling in WPWS for EVOS Restoration Project 10100750. Nearshore monitoring was conducted in collaboration with the NPS SWAN I&M program and, beginning in 2012, as part of the EVOSTC GWA program. Data collection was done in accordance with standard operating procedures set forth to monitor marine water chemistry and quality, marine intertidal invertebrates, kelps and seagrasses, marine birds, black oystercatchers, and sea otters. Summer sampling in 2012 represented the fourth year of sampling in WPWS (an initial year of sampling was done in WPWS in 2007; EVOS Restoration Project 070750). Based on our monitoring of nearshore species in WPWS, and comparisons of data from WPWS and other areas within the Gulf of Alaska, we have no evidence of continued injury to biological resources at the spatial scales we are monitoring. A key finding is that recovery of the sea otter population is no longer constrained by exposure to lingering oil; this is consistent with related EVOSTC studies on harlequin ducks (Restoration Project 12120114-Q). We anticipate continued annual nearshore monitoring in WPWS and at KATM and KEFJ under GWA, with data summaries and analyses including all three areas to provide a larger spatial and temporal context to the understanding of processes and patterns in nearshore ecosystems of the GOA which were impacted by the EVOS of 1989.

  5. Phase 1 studies summary of major findings of the South Bay Salt Pond Restoration Project, South San Francisco Bay, California

    Valoppi, Laura

    2018-04-02

    Executive SummaryThe South Bay Salt Pond Restoration Project (Project) is one of the largest restoration efforts in the United States. It is located in South San Francisco Bay of California. It is unique not only for its size—more than 15,000 acres—but also for its location adjacent to one of the nation’s largest urban areas, home to more than 4 million people (Alameda, Santa Clara, and San Mateo Counties). The Project is intended to restore and enhance wetlands in South San Francisco Bay while providing for flood management, wildlife-oriented public access, and recreation. Restoration goals of the project are to provide a mosaic of saltmarsh habitat to benefit marsh species and managed ponds to benefit waterbirds, throughout 3 complexes and 54 former salt ponds.Although much is known about the project area, significant uncertainties remain with a project of this geographic and temporal scale of an estimated 50 years to complete the restoration. For example, in order to convert anywhere from 50 to 90 percent of the existing managed ponds to saltmarsh habitat, conservation managers first enhance the habitat of managed ponds in order to increase use by waterbirds, and provide migratory, wintering, and nesting habitat for more than 90 species of waterbirds. Project managers have concluded that the best way to address these uncertainties is to carefully implement the project in phases and learn from the outcome of each phase. The Adaptive Management Plan (AMP) identifies specific restoration targets for multiple aspects of the Project and defines triggers that would necessitate some type of management action if a particular aspect is trending negatively. U.S. Geological Survey (USGS) biologist Laura Valoppi served as the project Lead Scientist and oversaw implementation of the AMP in coordination with other members of the Project Management Team (PMT), comprised of representatives from the California State Coastal Conservancy, California Department of Fish and

  6. Multiple Clustering Views via Constrained Projections

    Dang, Xuan-Hong; Assent, Ira; Bailey, James

    2012-01-01

    Clustering, the grouping of data based on mutual similarity, is often used as one of principal tools to analyze and understand data. Unfortunately, most conventional techniques aim at finding only a single clustering over the data. For many practical applications, especially those being described...... in high dimensional data, it is common to see that the data can be grouped into different yet meaningful ways. This gives rise to the recently emerging research area of discovering alternative clusterings. In this preliminary work, we propose a novel framework to generate multiple clustering views....... The framework relies on a constrained data projection approach by which we ensure that a novel alternative clustering being found is not only qualitatively strong but also distinctively different from a reference clustering solution. We demonstrate the potential of the proposed framework using both synthetic...

  7. The Environmental Restoration Project Style and Resources Guide; TOPICAL

    C. J. Forbes

    1999-01-01

    This Style Guide identifies the wide and flexible array of support services/resources that are available to ER project and functional organizations through Publication and Graphic Services. The Style Guide describes how ER Project groups can complete virtually any kind of information project without any costs charged to their budgets. Another purpose of the Style Guide is to provide ER project and functional organizations with the ability to determine when to request capabilities/resources for information projects, and when to complete such projects on their own

  8. Galerkin projection methods for solving multiple related linear systems

    Chan, T.F.; Ng, M.; Wan, W.L.

    1996-12-31

    We consider using Galerkin projection methods for solving multiple related linear systems A{sup (i)}x{sup (i)} = b{sup (i)} for 1 {le} i {le} s, where A{sup (i)} and b{sup (i)} are different in general. We start with the special case where A{sup (i)} = A and A is symmetric positive definite. The method generates a Krylov subspace from a set of direction vectors obtained by solving one of the systems, called the seed system, by the CG method and then projects the residuals of other systems orthogonally onto the generated Krylov subspace to get the approximate solutions. The whole process is repeated with another unsolved system as a seed until all the systems are solved. We observe in practice a super-convergence behaviour of the CG process of the seed system when compared with the usual CG process. We also observe that only a small number of restarts is required to solve all the systems if the right-hand sides are close to each other. These two features together make the method particularly effective. In this talk, we give theoretical proof to justify these observations. Furthermore, we combine the advantages of this method and the block CG method and propose a block extension of this single seed method. The above procedure can actually be modified for solving multiple linear systems A{sup (i)}x{sup (i)} = b{sup (i)}, where A{sup (i)} are now different. We can also extend the previous analytical results to this more general case. Applications of this method to multiple related linear systems arising from image restoration and recursive least squares computations are considered as examples.

  9. Richland Environmental Restoration Project management action process document

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites

  10. Richland Environmental Restoration Project management action process document

    NONE

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites.

  11. INVENTORY OF ECOSYSTEM RESTORATION PROJECTS - PUBLISHED ON THE OFFICE OF WATER WEB PAGE

    USEPA's National Risk Management Research Laboratory working jointly with the Office of Water, has developed an Internet-accessible database of ecosystem restoration projects within the Mid-Atlantic Integrated Assessment (MAIA) region. This article informs project owners of the i...

  12. Planning risk communication for UMTRA project groundwater restoration

    Hundertmark, Charles [Jacobs Engineering Group Inc. and University of Phoenix (United States); Hoopes, Jack [Jacobs Engineering Group Inc. (United States); Flowers, Len [Roy F. Weston Company (United States); Jackson, David G [U.S. Department of Energy (United States)

    1992-07-01

    The U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is entering a new phase in which groundwater contamination will become a growing focus as surface remedial action draws toward completion. Planning for risk communication associated with the groundwater project will be a major factor in the successful initiation of the program. (author)

  13. Planning risk communication for UMTRA project groundwater restoration

    Hundertmark, Charles; Hoopes, Jack; Flowers, Len; Jackson, David G.

    1992-01-01

    The U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is entering a new phase in which groundwater contamination will become a growing focus as surface remedial action draws toward completion. Planning for risk communication associated with the groundwater project will be a major factor in the successful initiation of the program. (author)

  14. A Multiple Watershed Approach to Assessing the Effects of Habitat Restoration Actions on Anadromous and Resident Fish Populations, Technical Report 2003-2004.

    Marmorek, David

    2004-03-01

    for future habitat restoration actions. Such designs are being developed concurrently with this project by several other groups in the Columbia Basin (RME Workgroup 2003, NMFS 2003, Hillman and Paulsen 2002, Hillman 2003). By addressing questions about habitat restoration and monitoring (in coordination with other related efforts), we hope that this project will catalyze a shift in the Basin's paradigm of habitat restoration, moving from implementation of individual watershed projects towards rigorously designed and monitored, multiwatershed, adaptive management experiments. The project involved three phases of work, which were closely integrated with various related and ongoing efforts in the region: (1) Scoping - We met with a Core Group of habitat experts and managers to scope out a set of testable habitat restoration hypotheses, identify candidate watersheds and recommend participants for a data evaluation workshop. (2) Data Assembly - We contacted over 80 scientists and managers to help evaluate the suitability of each candidate watershed's historical data for assessing the effectiveness of past restoration actions. We eventually settled on the Yakima, Wenatchee, Clearwater, and Salmon subbasins, and began gathering relevant data for these watersheds at a workshop with habitat experts and managers. Data assembly continued for several months after the workshop. (3) Data Analysis and Synthesis - We explored statistical approaches towards retrospectively analyzing the effects of restoration 'treatments' at nested spatial scales across multiple watersheds (Chapters 2-5 of this report). These analyses provided a foundation for identifying existing constraints to testing restoration hypotheses, and opportunities to overcome these constraints through improved experimental designs, monitoring protocols and project selection strategies (Chapters 6 and 7 of this report). Finally, we developed a set of recommendations to improve the design

  15. Image restoration by the method of convex projections: part 2 applications and numerical results.

    Sezan, M I; Stark, H

    1982-01-01

    The image restoration theory discussed in a previous paper by Youla and Webb [1] is applied to a simulated image and the results compared with the well-known method known as the Gerchberg-Papoulis algorithm. The results show that the method of image restoration by projection onto convex sets, by providing a convenient technique for utilizing a priori information, performs significantly better than the Gerchberg-Papoulis method.

  16. Hydrodynamic Modeling Analysis to Support Nearshore Restoration Projects in a Changing Climate

    Zhaoqing Yang

    2014-01-01

    Full Text Available To re-establish the intertidal wetlands with full tidal exchange and improve salmonid rearing habitat in the Skagit River estuary, State of Washington, USA, a diked agriculture farm land along the Skagit Bay front is proposed to be restored to a fully functional tidal wetland. The complex and dynamic Skagit River estuarine system calls for the need of a multi-facet and multi-dimensional analysis using observed data, numerical and analytical methods. To assist the feasibility study of the restoration project, a hydrodynamic modeling analysis was conducted using a high-resolution unstructured-grid coastal ocean model to evaluate the hydrodynamic response to restoration alternatives and to provide guidance to the engineering design of a new levee in the restoration site. A set of parameters were defined to quantify the hydrodynamic response of the nearshore restoration project, such as inundation area, duration of inundation, water depth and salinity of the inundated area. To assist the design of the new levee in the restoration site, the maximum water level near the project site was estimated with consideration of extreme high tide, wind-induced storm surge, significant wave height and future sea-level rise based on numerical model results and coastal engineering calculation.

  17. Reengineering of Analytical Data Management for the Environmental Restoration Project at Los Alamos National Laboratory

    Bolivar, S.; Dorries, A.; Nasser, K.; Scherma, S.

    2003-01-01

    The Environmental Restoration (ER) Project at Los Alamos National Laboratory (LANL) is responsible for the characterization, clean up, and monitoring of over 2,124 identified potential release sites (PRS). These PRSs have resulted from operations associated with weapons and energy related research which has been conducted at LANL since 1942. To accomplish mission goals, the ER Project conducts field sampling to determine possible types and levels of chemical contamination as well as their geographic extent. Last fiscal year, approximately 4000 samples were collected during ER Project field sampling campaigns. In the past, activities associated with field sampling such as sample campaign planning, paperwork, shipping and analytical laboratory tracking; verification and order fulfillment; validation and data quality assurance were performed by multiple groups working with a variety of software applications, databases and hard copy reports. This resulted in significant management and communication difficulties, data delivery delays, and inconsistent processes; it also represented a potential threat to overall data integrity. Creation of an organization, software applications and a data process that could provide for cost-effective management of the activities and data mentioned above became a management priority, resulting in a development of a reengineering task. This reengineering effort--currently nearing completion--has resulted in personnel reorganization, the development of a centralized data repository, and a powerful web-based sample management system that allows for an appreciably streamlined and more efficient data process. These changes have collectively cut data delivery times, allowed for larger volumes of samples and data to be handled with fewer personnel, and resulted in significant cost savings. This paper will provide a case study of the reengineering effort undertaken by the ER Project of its analytical data management process. It includes

  18. Reengineering of Analytical Data Management for the Environmental Restoration Project at Los Alamos National Laboratory

    Bolivar, S.; Dorries, A.; Nasser, K.; Scherma, S.

    2003-02-27

    The Environmental Restoration (ER) Project at Los Alamos National Laboratory (LANL) is responsible for the characterization, clean up, and monitoring of over 2,124 identified potential release sites (PRS). These PRSs have resulted from operations associated with weapons and energy related research which has been conducted at LANL since 1942. To accomplish mission goals, the ER Project conducts field sampling to determine possible types and levels of chemical contamination as well as their geographic extent. Last fiscal year, approximately 4000 samples were collected during ER Project field sampling campaigns. In the past, activities associated with field sampling such as sample campaign planning, paperwork, shipping and analytical laboratory tracking; verification and order fulfillment; validation and data quality assurance were performed by multiple groups working with a variety of software applications, databases and hard copy reports. This resulted in significant management and communication difficulties, data delivery delays, and inconsistent processes; it also represented a potential threat to overall data integrity. Creation of an organization, software applications and a data process that could provide for cost-effective management of the activities and data mentioned above became a management priority, resulting in a development of a reengineering task. This reengineering effort--currently nearing completion--has resulted in personnel reorganization, the development of a centralized data repository, and a powerful web-based sample management system that allows for an appreciably streamlined and more efficient data process. These changes have collectively cut data delivery times, allowed for larger volumes of samples and data to be handled with fewer personnel, and resulted in significant cost savings. This paper will provide a case study of the reengineering effort undertaken by the ER Project of its analytical data management process. It includes

  19. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2005

    Diefenderfer, Heida L.; Thom, Ronald M.; Borde, Amy B.; Roegner, G. C.; Whiting, Allan H.; Johnson, Gary E.; Dawley, Earl; Skalski, John R.; Vavrinec, John; Ebberts, Blaine D.

    2006-12-20

    This report is the second annual report of a six-year project to evaluate the cumulative effects of habitat restoration projects in the Columbia River Estuary, conducted by Pacific Northwest National Laboratory's Marine Sciences Laboratory, NOAA's National Marine Fisheries Service Pt. Adams Biological Field Station, and the Columbia River Estuary Study Taskforce for the US Army Corps of Engineers. In 2005, baseline data were collected on two restoration sites and two associated reference sites in the Columbia River estuary. The sites represent two habitat types of the estuary--brackish marsh and freshwater swamp--that have sustained substantial losses in area and that may play important roles for salmonids. Baseline data collected included vegetation and elevation surveys, above and below-ground biomass, water depth and temperature, nutrient flux, fish species composition, and channel geometry. Following baseline data collection, three kinds of restoration actions for hydrological reconnection were implemented in several locations on the sites: tidegate replacements (2) at Vera Slough, near the city of Astoria in Oregon State, and culvert replacements (2) and dike breaches (3) at Kandoll Farm in the Grays River watershed in Washington State. Limited post-restoration data were collected: photo points, nutrient flux, water depth and temperature, and channel cross-sections. In subsequent work, this and additional post-restoration data will be used in conjunction with data from other sites to estimate net effects of hydrological reconnection restoration projects throughout the estuary. This project is establishing methods for evaluating the effectiveness of individual projects and a framework for assessing estuary-wide cumulative effects including a protocol manual for monitoring restoration and reference sites.

  20. Pacific Lamprey Research and Restoration Project : Annual Report 2000.

    Close, David A.

    2002-11-01

    This report summarizes results of research activities conducted in 1999-2000. The findings in these chapters represent the efforts of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and collaborative efforts among other researchers working on Pacific lampreys (Lampetra tridentata) under this project. The findings in these chapters will help management and recovery of Pacific lampreys in the Columbia River Basin.

  1. Functions and requirements for tank farm restoration and safe operations, Project W-314. Revision 3

    Garrison, R.C.

    1995-01-01

    This Functions and Requirements document (FRD) establishes the basic performance criteria for Project W-314, in accordance with the guidance outlined in the letter from R.W. Brown, RL, to President, WHC, ''Tank Waste Remediation System (TWRS) Project Documentation Methodology,'' 94-PRJ-018, dated 3/18/94. The FRD replaces the Functional Design Criteria (FDC) as the project technical baseline documentation. Project W-314 will improve the reliability of safety related systems, minimize onsite health and safety hazards, and support waste retrieval and disposal activities by restoring and/or upgrading existing Tank Farm facilities and systems. The scope of Project W-314 encompasses the necessary restoration upgrades of the Tank Farms' instrumentation, ventilation, electrical distribution, and waste transfer systems

  2. Do the Principles of Ecological Restoration Cover EU LIFE Nature Cofunded Projects in Denmark?

    Jonas Morsing

    2013-12-01

    Full Text Available Ecological restoration is becoming a main component in nature management; hence, its definitions and interpretations of the underlying principles are widely discussed. In Denmark, restoration has been implemented for decades, and the LIFE Nature program has contributed to several large-scale projects. Our aim was to indicate tendencies in Danish nature policy by analyzing a representative sample of nature management projects. Using qualitative document analyses of official reports, we investigated how well 13 LIFE Nature cofinanced projects undertaken in Denmark fit with the principles of ecological restoration, as formulated in the nine attributes of the Society for Ecological Restoration's Primer on Ecological Restoration, and based on the five myths of ecological restoration. Objectives of the analyzed projects were divided into three categories: conservation of a single or a group of species; restoration of set-aside areas, mainly on abandoned agricultural land; and habitat management of Natura 2000 areas. Despite this grouping, improvement in living conditions for certain species associated with specific nature types was in focus in all projects. No projects considered or fulfilled all nine attributes. It seems that attributes associated with fundamental requirements for the existence of target species or habitats were more often fulfilled than attributes associated with continuity of the ecosystem as a whole, which indicated a focus on ecosystem structures rather than on processes. We found that the two assumptions of a predictable single endpoint (the myth of the Carbon Copy and that nature is controllable (the myth of Command and Control were notably frequent in the Danish projects. Often, the target ecosystem was associated with a semicultural landscape, and management focused on keeping the vegetation low and preventing overgrowth of colonizing trees. The results indicated that nature policy in Denmark and the LIFE Nature program are

  3. A project to develop restoration methods for buildings and facilities after a terrorist attack

    Fingas, M.F. [Environment Canada, Ottawa, ON (Canada). Emergencies Science and Technology Div]|[Environment Canada, Ottawa, ON (Canada). River Road Environmental Technology Centre; Volchek, K.; Hornof, M.; Boudreau, L.; Punt, M. [SAIC Canada, Ottawa, ON (Canada); Payette, P.; Best, M. [Health Canada, Ottawa, ON (Canada); Garbutt, M.; Krishnan, J.; Wagener, S.; Bernard, K. [Health Canada, Winnipeg, MB (Canada); Cousins, T.; Haslip, D. [Defence Research and Development Canada, Ottawa, ON (Canada)

    2004-07-01

    A multi-agent project was initiated to review site restoration after a terrorist attack. The objective was to acquire and compile information on all known restoration procedures for buildings, exteriors of buildings, their interior contents, and adjacent areas such as parking lots, lawns and vehicles. All procedures were then tested and validated. Restoration procedures included pickup, neutralization, decontamination, removal and final destruction/deposition of the contaminant, cleaning material and contaminated debris resulting from the terrorist act. This research and development project considered chemical, biological and nuclear contamination with the intent to develop methods to decontaminate and restore buildings after a chemical, biological and radiological (CBR) attack. Ideas were collected from work conducted around the world. The efficacy of best candidates was tested along with all selected chemical target items. The project also involved the preparation of procedures for decontamination and restoration. Ultimately, a tradeoff decision basis will be developed to provide information on abandonment and quarantine versus cleanup. The study revealed that there are several technologies that can be used for the decontamination of structures and equipment after acts of terrorism, however, no one technique will work for all contaminants on all surfaces. The selection of a decontamination method depends on the contaminant, the surface being decontaminated and economic, social and health factors. The amount of waste generated by decontamination is a major feasibility factor. 25 refs., 6 tabs.

  4. 42 CFR 137.327 - May multiple projects be included in a single construction project agreement?

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May multiple projects be included in a single construction project agreement? 137.327 Section 137.327 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.327 May multiple projects be included in a single...

  5. Lower Red River Meadow Restoration Project : Biennial Report 1996-97.

    LRK Communications; Wildlife Habitat Institute; Pocket Water, Inc.

    2003-07-01

    The Red River has been straightened and the riparian vegetation corridor eliminated in several reaches within the watershed. The river responded by incision resulting in over-steepened banks, increased sedimentation, elevated water temperatures, depressed groundwater levels, reduced floodplain function, and degraded fish habitat. The Lower Red River Meadow Restoration Project is a multi-phase ecosystem enhancement effort that restores natural physical and biological processes and functions to stabilize the stream channel and establish high quality habitats for fish and wildlife. A natural channel restoration philosophy guides the design and on the ground activities, allowing the channel to evolve into a state of dynamic equilibrium. Two years of planning, two years of restoration in Phases I and II, and one year post-restoration monitoring are complete. By excavating new bends and reconnecting historic meanders, Phase I and II channel realignment increased channel length by 3,060 feet, decreased channel gradient by 25 percent, and increased sinuosity from 1.7 to 2.3. Cross-sectional shapes and point bars were modified to maintain deep pool habitat at low flow and to reconnect the meadow floodplain. Improved soil moisture conditions will help sustain the 31,500 native riparian plantings reestablished within these two phases. Overall, short-term restoration performance was successful. Analyses of long-term parameters document either post-restoration baseline conditions or early stages of evolution toward desired conditions. An adaptive management strategy has helped to improve restoration designs, methods, and monitoring. Lessons learned are being transferred to a variety of audiences to advance the knowledge of ecological restoration and wise management of watersheds.

  6. The Whiteside Run restoration project: Wetlands and stream mitigation and restoration of a previously polluted stream

    Bigatel, A.; Hellier, W.W.; Forman, J.G.; Kepler, S.

    1998-01-01

    An 841,000 m 3 coal refuse pile from the operation of a now abandoned Lower Kitanning (B) coal deep mine had been the source of over 95% of the mine drainage pollution in Whiteside Run, a tributary of Moshannon Creek in Gulich and Woodward Townships, Clearfield County, Pennsylvania. Representative water quality upstream of the refuse pile was: pH = 6.9; alkalinity = 31 and acidity = 0 mg/L as CaCO 3 equivalent; [Fe] = 0.85 mg/L; [Mn] = 0.31 mg/L; and [Al] = 0.25 mg/L. Representative water quality downstream of the refuse pile before th project was: pH = 3.0; alkalinity = 0 and acidity = 358 mg/L as CaCO 3 equivalent; [Fe] = 7.08 mg/L; [Mn] = 0.81 mg/L; and [Al] = 46.86 mg/L. Present downstream water quality is: pH = 5.9; alkalinity = 14.3 and acidity = 8.1 mg/L as CaCO 3 equivalent; [Fe] = 1.57 mg/L; [Mn] = 0.92 mg/L; and [Al] = 0.97 mg/L. There has been a significant improvement in the diversity of aquatic life since the project was undertaken. Power Operating Co., Inc., a local coal mining company, applied for authorization to conduct coal mining activities which would affect a wetland with an area of 1.7 ha and 790 m of an unnamed tributary of Moshannon Creek. Although part of this wetland was anthropogenic, having developed because earlier mining activities by others had affected the channel of the unnamed tributary of Moshannon Creek, the major portion of the area was a natural wetland. Power Operating developed 2.6 ha (6.5 ac) of constructed wetlands to replace the wetland disturbed by mining. The refuse pile was removed and placed in the backfilled area of Power's adjacent surface mine permit, and the mitigation wetland was constructed on the area formerly occupied by the refuse pile. As a result, 6.4 km (4 mi) of formerly polluted stream are now capable of supporting fish

  7. Lower Klickitat Riparian and In-channel Habitat Restoration Project, Annual Report 2001-2002.

    Conley, Will

    2003-10-01

    This project focuses on the lower Klickitat River and its tributaries that provide or affect salmonid habitat. The overall goal is to restore watershed health to aid recovery of salmonid stocks in the Klickitat subbasin. An emphasis is placed on restoration and protection of watersheds supporting anadromous fish production, particularly steelhead (Oncorhyncus mykiss) which are listed as 'Threatened' within the Mid-Columbia ESU. Restoration activities are aimed at restoring stream processes by removing or mitigating watershed perturbances and improving habitat conditions and water quality. In addition to steelhead, habitat improvements benefit Chinook (O. tshawytscha) and coho (O. kisutch) salmon, resident rainbow trout, and enhance habitat for many terrestrial and amphibian wildlife species. Protection activities compliment restoration efforts within the subbasin by securing refugia and preventing degradation. Since 90% of the project area is in private ownership, maximum effectiveness will be accomplished via cooperation with state, federal, tribal, and private entities. The project addresses goals and objectives presented in the Klickitat Subbasin Summary and the 1994 NWPPC Fish and Wildlife Program. Feedback from the 2000 Provincial Review process indicated a need for better information management to aid development of geographic priorities. Thus, an emphasis has been placed on database development and a review of existing information prior to pursuing more extensive implementation. Planning and design was initiated on several restoration projects. These priorities will be refined in future reports as the additional data is collected and analyzed. Tasks listed are for the April 1, 2001 to August 31, 2002 contract cycle, for which work was delayed during the summer of 2001 because the contract was not finalized until mid-August 2001. Accomplishments are provided for the September 1, 2001 to August 31, 2002 reporting period. During this reporting period

  8. Revitalisation of Orlík reservoir – case study of a regional restoration project

    Ivana Očásková

    2014-06-01

    Full Text Available This case study describes the bottom-up formation of a regional project for restoring a reservoir. Land use changes in the upper Vltava river basin caused the eutrophication of Orlík reservoir, which resulted in water blooms, which in association with socio-economic changes caused a decline in tourism in this region and serious difficulties for local people. The study examines how public awareness helped in the establishment of a restoration project, its framework and strategy. Regional governance of the project management took into consideration both knowledge-based solutions and the interests of local people and municipalities. The project has the potential for resolving both environmental and socio-economic problems and providing a sustainable win-win strategy for the region, residents, tourists and stakeholders.

  9. The Pen Branch Project: Restoration of a Forested Wetland in South Carolina

    Randall K. Kolka; Eric A. Nelson; Ronald E. Bonar; Neil C. Dulohery; David Gartner

    1998-01-01

    The Pen Branch Project is a program to restore a forested riparian wetland that has been subject to thermal disturbance caused by nuclear reactor operations at the Department of Energy's (DOE) Savannah River Site (SRS), an 80,200-hectare nuclear facility located in South Carolina. Various levels of thermal discharges to streams located across the US. have occurred...

  10. 76 FR 70955 - Helena Nation Forest: Dalton Mountain Forest Restoration & Fuels Reduction Project

    2011-11-16

    ... DEPARTMENT OF AGRICULTURE Forest Service Helena Nation Forest: Dalton Mountain Forest Restoration & Fuels Reduction Project AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an environmental impact statement. SUMMARY: The Helena National Forest (HNF) is proposing on the Lincoln Ranger...

  11. 77 FR 18997 - Rim Lakes Forest Restoration Project; Apache-Sitgreavese National Forest, Black Mesa Ranger...

    2012-03-29

    ... DEPARTMENT OF AGRICULTURE Forest Service Rim Lakes Forest Restoration Project; Apache-Sitgreavese National Forest, Black Mesa Ranger District, Coconino County, AZ AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an environmental impact statement. SUMMARY: The U.S. Forest Service (FS) will...

  12. Protocols for Monitoring Habitat Restoration Projects in the Lower Columbia River and Estuary

    Roegner, G. Curtis; Diefenderfer, Heida L.; Borde, Amy B.; Thom, Ronald M.; Dawley, Earl M.; Whiting, Allan H.; Zimmerman, Shon A.; Johnson, Gary E.

    2008-04-25

    Protocols for monitoring salmon habitat restoration projects are essential for the U.S. Army Corps of Engineers' environmental efforts in the Columbia River estuary. This manual provides state-of-the science data collection and analysis methods for landscape features, water quality, and fish species composition, among others.

  13. 77 FR 23740 - Sears Point Wetland and Watershed Restoration Project, Sonoma County, CA; Final Environmental...

    2012-04-20

    ...-FF08RSFC00] Sears Point Wetland and Watershed Restoration Project, Sonoma County, CA; Final Environmental... environmental impact report and environmental impact statement (EIR/EIS) for the Sears Point Wetland and..., while providing public access and recreational and educational opportunities compatible with ecological...

  14. A demonstration project to test ecological restoration of a pinyon-juniper ecosystem

    David W. Huffman; Michael T. Stoddard; Peter Z. Fule; W. Wallace Covington; H. B. Smith

    2008-01-01

    To test an approach for restoring historical stand densities and increasing plant species diversity of a pinyon-juniper ecosystem, we implemented a demonstration project at two sites (CR and GP) on the Grand Canyon-Parashant National Monument in northern Arizona. Historical records indicated that livestock grazing was intensive on the sites beginning in the late 1800s...

  15. Evaluating the ecological economic success of riparian restoration projects in Arizona (Abstract)

    Gary B. Snider

    2000-01-01

    The past 4 years the Arizona Water Protection Fund provided more than $25 million to individuals and organizations for stream and riparian restoration projects in Arizona. Information which increases the awareness of the value of Arizona's riparian systems is crucial to the incorporation of ecosystem services into decision-making frameworks, which are largely...

  16. A summary of the environmental restoration program retrieval demonstration project at the Idaho National Engineering Laboratory

    McQuary, J.

    1991-02-01

    This report provides a summary of the Environmental Restoration Program's Retrieval Demonstration Project at the Idaho National Engineering Laboratory. This project developed concepts for demonstrating facilities and equipment for the retrieval of buried transuranic mixed waste at the INEL. Included is a brief assessment of the viability, cost effectiveness, and safety of retrieval based on the developed concept. Changes made in Revision 1 reflect editorial changes only. 31 refs., 1 fig

  17. Conceptual design report for tank farm restoration and safe operations, project W-314

    Briggs, S.R., Westinghouse Hanford

    1996-05-02

    This Conceptual Design Report (CDR) presents the conceptual level design approach that satisfies the established technical requirements for Project W-314, `Tank Farm Restoration and Safe Operations.` The CDR also addresses the initial cost and schedule baselines for performing the proposed Tank Farm infrastructure upgrades. The scope of this project includes capital improvements to Hanford`s existing tank farm facilities(primarily focused on Double- Shell Tank Farms) in the areas of instrumentation/control, tank ventilation, waste transfer, and electrical systems.

  18. Evaluation of Cumulative Ecosystem Response to Restoration Projects in the Lower Columbia River and Estuary, 2010

    Johnson, Gary E.; Diefenderfer, Heida L.; Thom, Ronald M.; Roegner, G. Curtis; Ebberts, Blaine D.; Skalski, John R.; Borde, Amy B.; Dawley, Earl; Coleman, Andre M.; Woodruff, Dana L.; Breithaupt, Stephen A.; Cameron, April; Corbett, C.; Donley, Erin E.; Jay, D. A.; Ke, Yinghai; Leffler, K.; McNeil, C.; Studebaker, Cindy; Tagestad, Jerry D.

    2012-05-01

    This is the seventh and final annual report of a project (2004–2010) addressing evaluation of the cumulative effects of habitat restoration actions in the 235-km-long lower Columbia River and estuary. The project, called the Cumulative Effects (CE) study, was conducted for the U.S. Army Corps of Engineers Portland District by a collaboration of research agencies led by the Pacific Northwest National Laboratory. We achieved the primary goal of the CE study to develop a methodology to evaluate the cumulative effects of habitat actions in the Columbia Estuary Ecosystem Restoration Program. We delivered 1) standard monitoring protocols and methods to prioritize monitoring activities; 2) the theoretical and empirical basis for a CE methodology using levels-of-evidence; 3) evaluations of cumulative effects using ecological relationships, geo-referenced data, hydrodynamic modeling, and meta-analyses; and 4) an adaptive management process to coordinate and coalesce restoration efforts in the LCRE. A solid foundation has been laid for future comprehensive evaluations of progress made by the Columbia Estuary Ecosystem Restoration Program to understand, conserve, and restore ecosystems in the lower Columbia River and estuary.

  19. Effects of national ecological restoration projects on carbon sequestration in China from 2001 to 2010.

    Lu, Fei; Hu, Huifeng; Sun, Wenjuan; Zhu, Jiaojun; Liu, Guobin; Zhou, Wangming; Zhang, Quanfa; Shi, Peili; Liu, Xiuping; Wu, Xing; Zhang, Lu; Wei, Xiaohua; Dai, Limin; Zhang, Kerong; Sun, Yirong; Xue, Sha; Zhang, Wanjun; Xiong, Dingpeng; Deng, Lei; Liu, Bojie; Zhou, Li; Zhang, Chao; Zheng, Xiao; Cao, Jiansheng; Huang, Yao; He, Nianpeng; Zhou, Guoyi; Bai, Yongfei; Xie, Zongqiang; Tang, Zhiyao; Wu, Bingfang; Fang, Jingyun; Liu, Guohua; Yu, Guirui

    2018-04-17

    The long-term stressful utilization of forests and grasslands has led to ecosystem degradation and C loss. Since the late 1970s China has launched six key national ecological restoration projects to protect its environment and restore degraded ecosystems. Here, we conducted a large-scale field investigation and a literature survey of biomass and soil C in China's forest, shrubland, and grassland ecosystems across the regions where the six projects were implemented (∼16% of the country's land area). We investigated the changes in the C stocks of these ecosystems to evaluate the contributions of the projects to the country's C sink between 2001 and 2010. Over this decade, we estimated that the total annual C sink in the project region was 132 Tg C per y (1 Tg = 10 12 g), over half of which (74 Tg C per y, 56%) was attributed to the implementation of the projects. Our results demonstrate that these restoration projects have substantially contributed to CO 2 mitigation in China.

  20. Exxon Valdez oil spill restoration project final report: Prince William Sound Herring disease program (HDP), restoration project 070819

    Hershberger, Paul; Elliott, Diane G.; Emmenegger, Eveline J.; Hansen, John D.; Kurath, Gael; Winton, James R.; Kocan, Richard; LaPatra, Scott

    2011-01-01

    Surveys of pathogens in Pacific herring from 2007 – 2010 indicated that Ichthyophonus, viral hemorrhagic septicemia virus, and erythrocytic necrosis virus are endemic in Prince William Sound and throughout the NE Pacific. Laboratory studies with VHSV indicated that multiple herring stocks are equally susceptible to the resulting disease, Pacific herring shed copious levels of VHSV (as high at 5x108 plaque-forming units/day) shortly after exposure, chronic and persistent infections can occur in Pacific herring, susceptibility of Pacific herring to VHS extends to the larval life stages but not the embryonic stages, and the prior exposure history of Pacific herring to VHSV can be determined post hoc. Laboratory studies involving Ichthyophonus indicated that schizonts can be inactivated with chlorine and iodine solutions, the parasite can survive for extended periods in saltwater but not freshwater, a low potential exists for cross contamination between in vitro explant cultures, infectious schizonts are released from the skin surface of infected herring, schizonts are not uniformly distributed throughout the skeletal muscle of infected Pacific herring, multiple types of Ichthyophonus exist with different genotypes and phenotypic traits, and temperature is an important factor influencing the infectivity of Ichthyophonus. Additional field and laboratory studies indicated that Ichthyophonus negatively influences the swimming performance of infected hosts and the negative impacts effects are exacerbated by increasing temperatures, American shad are an important reservoir of Ichthyophonus in the NE Pacific, Pacific herring are not susceptible to infectious hematopoietic necrosis (IHN), and Pacific herring will accept surgically implanted acoustic tags with negligible impacts on survival.

  1. Pacific lamprey research and restoration project: annual report 1999; ANNUAL

    Close, David A.

    2001-01-01

    This report summarizes results of research activities conducted from 1996 through 1999. The findings in these chapters represent the efforts of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and collaborative efforts among other researchers working on Pacific lampreys (Lampetra tridentata) under this project. The findings in these chapters will help management and recovery of Pacific lampreys in the Columbia River Basin. Traditional Ecological Knowledge (TEK) of Pacific lampreys from tribal members within the Confederated Tribes of the Umatilla Indian Reservation was useful in gaining baseline life history information. Tribal members described harvesting two types of lampreys from spring through fall, the short brown type and the long dark type. Lamprey spawning distribution was from the mouth to the headwaters in the Umatilla River. Larval lampreys were observed in the mud and sand areas of the river. Tribal members observed major declines in lampreys within the Columbia River basin. Larval Pacific lampreys were distributed throughout the John Day River basin. Larval distribution in the other subbasins was patchy and limited to the lower reaches of the streams. Larval densities were highly variable in the Middle Fork John Day and North Fork John Day rivers, as opposed to the Main stem John Day River. Larval lengths varied little in the Middle Fork John Day and North Fork John Day rivers, but were highly variable in the Main stem John Day River. Larval abundance decreased as we moved upstream in the Columbia and Snake rivers. In addition, we found strong evidence for lack of larval recruitment as distance increased from the mouth of the Columbia River. We identified clinical indicators of stress in adult Pacific lampreys. Plasma glucose became elevated soon after acute stress and remained elevated for one week. Plasma lactate also became elevated by 30 minutes; however, it decreased to resting levels by one hour after application of the stressor

  2. Pacific Lamprey Research and Restoration Project : Annual Report 1999.

    Close, David A.

    2001-10-01

    This report summarizes results of research activities conducted from 1996 through 1999. The findings in these chapters represent the efforts of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and collaborative efforts among other researchers working on Pacific lampreys (Lampetra tridentata) under this project. The findings in these chapters will help management and recovery of Pacific lampreys in the Columbia River Basin. Traditional Ecological Knowledge (TEK) of Pacific lampreys from tribal members within the Confederated Tribes of the Umatilla Indian Reservation was useful in gaining baseline life history information. Tribal members described harvesting two types of lampreys from spring through fall, the short brown type and the long dark type. Lamprey spawning distribution was from the mouth to the headwaters in the Umatilla River. Larval lampreys were observed in the mud and sand areas of the river. Tribal members observed major declines in lampreys within the Columbia River basin. Larval Pacific lampreys were distributed throughout the John Day River basin. Larval distribution in the other subbasins was patchy and limited to the lower reaches of the streams. Larval densities were highly variable in the Middle Fork John Day and North Fork John Day rivers, as opposed to the Main stem John Day River. Larval lengths varied little in the Middle Fork John Day and North Fork John Day rivers, but were highly variable in the Main stem John Day River. Larval abundance decreased as we moved upstream in the Columbia and Snake rivers. In addition, we found strong evidence for lack of larval recruitment as distance increased from the mouth of the Columbia River. We identified clinical indicators of stress in adult Pacific lampreys. Plasma glucose became elevated soon after acute stress and remained elevated for one week. Plasma lactate also became elevated by 30 minutes; however, it decreased to resting levels by one hour after application of the stressor

  3. Science Roles and Interactions in Adaptive Management of Large River Restoration Projects, Midwest United States

    Jacobson, R. B.; Galat, D. L.; Smith, C. B.

    2010-12-01

    Most large-river restoration projects include formal or informal implementations of adaptive management strategies which acknowledge uncertainty and use scientific inquiry to learn and refine management options. Although the central role of science in reducing uncertainty is acknowledged in such projects, specific roles and interactions can vary widely, including how science relates to decision-making within the governance of these projects. Our objective is to present some structured generalizations about science roles and interactions as developed from the authors’ experiences in adaptive management of large river restoration in the Midwest United States. Scientific information may be introduced into decision making by scientists acting in any of the three roles common to adaptive management -- action agency representative, stakeholder, or science provider. We have observed that confusion and gridlock can arise when it is unclear if a scientist is acting as an advocate for a stakeholder or management position, or instead as an independent, “honest broker” of science. Although both advocacy and independence are proper and expected in public decision making, it is useful when scientists unambiguously identify their role. While complete scientific independence may be illusory, transparency and peer review can promote the ideal. Transparency comes from setting clear directions and objectives at the decision-making level and defining at the outset how learning will help assess progress and inform decisions. Independent peer reviews of proposals, study plans, and publications serve as a powerful tool to advance scientific independence, even if funding sources present a potential conflict of interest. Selection of experts for scientific advice and review often requires consideration of the balance between benefits of the “outside” expert (independent, knowledgeable but with little specific understanding of the river system), compared to those provided by the

  4. UAV remote sensing atmospheric degradation image restoration based on multiple scattering APSF estimation

    Qiu, Xiang; Dai, Ming; Yin, Chuan-li

    2017-09-01

    Unmanned aerial vehicle (UAV) remote imaging is affected by the bad weather, and the obtained images have the disadvantages of low contrast, complex texture and blurring. In this paper, we propose a blind deconvolution model based on multiple scattering atmosphere point spread function (APSF) estimation to recovery the remote sensing image. According to Narasimhan analytical theory, a new multiple scattering restoration model is established based on the improved dichromatic model. Then using the L0 norm sparse priors of gradient and dark channel to estimate APSF blur kernel, the fast Fourier transform is used to recover the original clear image by Wiener filtering. By comparing with other state-of-the-art methods, the proposed method can correctly estimate blur kernel, effectively remove the atmospheric degradation phenomena, preserve image detail information and increase the quality evaluation indexes.

  5. Effect of preparation convergence on retention of multiple unit restorations - An in vitrostudy

    Dileep Nag Vinnakota

    2015-01-01

    Full Text Available Background and Aim: Convergence angle (CA is one of the major determinant factors in the retention of single as well as multiple units. Hence, the aim of the present study was to determine the effect of preparation convergence on the retention of multiple unit restorations. Materials and Methods: Nickel-chromium alloy single crowns as well as three, six and nine multiple unit fixed partial dentures (FPDs were casted for standardized milled dies that simulate canine, premolar and molar teeth machined with two different degrees of convergence, 12 (n = 55 and 20 (n = 55. The dies were threaded on rectangular metal platforms with the help of retainer shaft in the proper position to model either single or multiple preparations. The casted crowns and FPDs were cemented and retention tested by securing the units in an Instron universal testing machine. The tabulated values were analyzed statistically using Mann-Whitney test. Results: Single and multiple units with 12° CA needed greater force to dislodge compared to 20°, but this difference was not statistically significant for single units of premolar (P > 0.05. Irrespective of the angle, there was a simultaneous statistically significant increase in retention as the number of units increased in FPDs, except for the difference between 3 and 6 units in 20° group (P > 0.05. Conclusion: This study highlights the importance of emphasizing on CA, during canine and molar preparation for single units as well as preparation of canines for 6 units FPDs.

  6. Multiple projection optical diffusion tomography with plane wave illumination

    Markel, Vadim A; Schotland, John C

    2005-01-01

    We describe a new data collection scheme for optical diffusion tomography in which plane wave illumination is combined with multiple projections in the slab imaging geometry. Multiple projection measurements are performed by rotating the slab around the sample. The advantage of the proposed method is that the measured data are more compatible with the dynamic range of most commonly used detectors. At the same time, multiple projections improve image quality by mutually interchanging the depth and transverse directions, and the scanned (detection) and integrated (illumination) surfaces. Inversion methods are derived for image reconstructions with extremely large data sets. Numerical simulations are performed for fixed and rotated slabs

  7. Looking back on a successful project. The Restoration of the Royal Palace in Amsterdam

    Bert van Bommel

    2013-06-01

    Full Text Available After 1968, few changes were made to the Royal Palace in Amsterdam and eventually the palace was no longer functionally and technically up-to-date. Initially, the most recent restoration was only aimed at remedying that situation. Also, the project was split up and priority was given to fixing up the interior. Gradually, the actual restoration gained prominence. In 2007 it was decided to also restore the 1808 furniture. Until 2006, the government architect had hardly been involved in the restoration of the interior. This architect, Krijn van den Ende, was advised by various committees. Prior restorations (1929-1939 and 1960-1968 had restored the palace to its 17th-century state as best as possible. The most recent restoration respected this, while at the same time it aimed at connecting the 17th century character of the building to the unique collection of Empire furniture. This furniture was restored, as were the chandeliers and candelabras. All the ceilings on the first floor were studied and treated and the paintings between the beams were meticulously restored. A very important aspect was the restoration of the so-called ‘Bataven’ series in the galleries. Much of the work concerned making the building conform to contemporary standards. Once again the palace is now a suitable venue for official occasions. The inevitable addition of a lift did however cause quite a stir. Accessibility was improved and more representative rooms are now open to the public than before. The government architect was involved already in the preparatory stages of the second part of the restoration, which concerned the façades and the roofs. In executing the actual work a support committee provided advice and direction on his behalf. Although the sandstone is generally of a high quality, before 1968 a limited number of deteriorating blocks had been replaced. This time too, a number of blocks needed attention. The heavy scaffolding that needed to be installed for

  8. Supplement Analysis for the Watershed Management Program EIS--Tapteal Bend Riparian Corridor Restoration Project

    N/A

    2004-08-11

    The Bonneville Power Administration is proposing to fund the restoration of approximately 500 feet of streambank along the Yakima River at river mile 8, upstream of the Van Giesen Bridge on SR 224, in and between Richland and West Richland, Washington. This project will also result in the acquisition of Fox Island, a 12-acre island directly across the river from the restoration area. There is no development planned for the island. The proposed project includes: The installation of a bio-engineered streambank that incorporates barbs to capture silt and deflect flow, roughened rock or log toes, a riparian buffer, soil reinforcement, and bank grading. Long-term photo-point and plot sampling will also be implemented to evaluate the effectiveness and success of the restoration project. The NEPA compliance checklist for this project was completed by Darrel Sunday, a contractor with Sunday and Associates, Inc. (April 4, 2004), and meets the standards and guidelines for the Watershed Management Program Environmental Impact Statement (EIS) and Record of Decision (ROD). The Endangered Species Act (ESA) listed species that may occur in the general vicinity of the project area are the pygmy rabbit, bald eagle, bull trout, Ute ladies'-tresses, and mid-Columbia Steelhead. The pygmy rabbit, bald eagle, and Ute ladies'Tresses are not known to occur in the immediate project vicinity, and it was determined that the proposed restoration project would have no effect on these species. It is difficult to determine if bull trout occur within the Tapteal project area and Dave Carl of the Washington Department of Fish & Wildlife was contacted and concurred with this assumption. It was determined that the project may affect, but is not likely to adversely affect bull trout, and the U.S. Fish & Wildlife Service has concurred with that determination (July 28, 2004). For the mid-Columbia Steelhead, an anadromous fish species, BPA has determined that if conducted in accordance with

  9. Use of the geometric mean of opposing planar projections in pre-reconstruction restoration of SPECT images

    Boulfelfel, D.; Rangayyan, R.M.; Hahn, L.J.; Kloiber, R.

    1992-01-01

    This paper presents a restoration scheme for single photon emission computed tomography (SPECT) images that performs restoration before reconstruction (pre-reconstruction restoration) from planar (projection) images. In this scheme, the pixel-by-pixel geometric mean of each pair of opposing (conjugate) planar projections is computed prior to the reconstruction process. The averaging process is shown to help in making the degradation phenomenon less dependent on the distance of each point of the object from the camera. The restoration filters investigated are the Wiener and power spectrum equalization filters. (author)

  10. Waste Generation Forecast for DOE-ORO's Environmental Restoration OR-1 Project: FY 1994--FY 2001

    1993-12-01

    This Waste Generation Forecast for DOE-ORO's Environmental Restoration OR-1 Project. FY 1994--FY 2001 is the third in a series of documents that report current estimates of the waste volumes expected to be generated as a result of Environmental Restoration activities at Department of Energy, Oak Ridge Operations Office (DOE-ORO), sites. Considered in the scope of this document are volumes of waste expected to be generated as a result of remedial action and decontamination and decommissioning activities taking place at these sites. Sites contributing to the total estimates make up the DOE-ORO Environmental Restoration OR-1 Project: the Oak Ridge K-25 Site, the Oak Ridge National Laboratory, the Y-12 Plant, the Paducah Gaseous Diffusion Plant, the Portsmouth Gaseous Diffusion Plant, and the off-site contaminated areas adjacent to the Oak Ridge facilities (collectively referred to as the Oak Ridge Reservation Off-Site area). Estimates are available for the entire fife of all waste generating activities. This document summarizes waste estimates forecasted for the 8-year period of FY 1994-FY 2001. Updates with varying degrees of change are expected throughout the refinement of restoration strategies currently in progress at each of the sites. Waste forecast data are relatively fluid, and this document represents remediation plans only as reported through September 1993

  11. Lower Yakima Valley Wetlands and Riparian Restoration Project. Final environmental assessment

    1994-01-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. This Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large 20, 340 hectare (50, 308 acre) project area. As individual properties are secured for the Project, three site-specific activities (habitat enhancement, operation and maintenance, and monitoring and evaluation) may be subject to further site-specific environmental review. All required Federal/Tribal coordination, permits and/or approvals would be obtained prior to ground disturbing activities

  12. Lower Yakima Valley Wetlands and Riparian Restoration Project. Final Environmental Assessment.

    United States. Bonneville Power Administration

    1994-10-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. This Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large 20, 340 hectare (50, 308 acre) project area. As individual properties are secured for the Project, three site-specific activities (habitat enhancement, operation and maintenance, and monitoring and evaluation) may be subject to further site-specific environmental review. All required Federal/Tribal coordination, permits and/or approvals would be obtained prior to ground disturbing activities.

  13. Big rock point restoration project BWR major component removal, packaging and shipping - planning and experience

    Milner, T.; Dam, S.; Papp, M.; Slade, J.; Slimp, B.; Nurden, P.

    2001-01-01

    The Big Rock Point boiling water reactor (BWR) at Charlevoix, MI was permanently shut down on August 29th 1997. In 1999 BNFL Inc.'s Reactor Decommissioning Group (RDG) was awarded a contract by Consumers Energy (CECo) for the Big Rock Point (BRP) Major Component Removal (MCR) project. BNFL Inc. RDG has teamed with MOTA, Sargent and Lundy and MDM Services to plan and execute MCR in support of the facility restoration project. The facility restoration project will be completed by 2005. Key to the success of the project has been the integration of best available demonstrated technology into a robust and responsive project management approach, which places emphasis on safety and quality assurance in achieving project milestones linked to time and cost. To support decommissioning of the BRP MCR activities, a reactor vessel (RV) shipping container is required. Discussed in this paper is the design and fabrication of a 10 CFR Part 71 Type B container necessary to ship the BRP RV. The container to be used for transportation of the RV to the burial site was designed as an Exclusive Use Type B package for shipment and burial at the Barnwell, South Carolina (SC) disposal facility. (author)

  14. A restoration and conservation project of the “Saint Dominic” Monastery in Soriano Calabro, Italy

    Nazzareno Davolos

    2008-04-01

    Full Text Available The article is extracted from the Master Thesis about Restoration of the Monuments at “La Sapienza”, University of the Studies of Rome. The Monastery was one of the most important of the Dominican Order in Europe. The building dates back to year 1510, it broke down almost completely in the earthquake of year 1659. It was rebuilt following the architect B. Presti’s project. At the present time the “Saint Domenic” Monastery largely seems a ruin, mainly as a consequence of the cat- N. Davolos - A restoration and conservation project of the ÒSaint DominicÓ Monastery... 185 astrophic earthquake in 1783. However, with the new look that has acquired, it still preserves an extraordinary charm that continues to astonish. The project followed the trend of the critical and conservative restoration with the safeguard of the artistic and figurative data of the “Saint Domenic” Monastery which has been analysed through an accurate historical-critical work. The idea is to preserve and transmit to the future generations the “Saint Domenic” monument in his authenticity, in its formal and material consistence, with the marks of the passing of time. The abstracts reports only the most important aspects which are representative of the project. Besides the historical analysis, laboratory examination have been executed on the material used in the construction of the ancient facade through the observation of thin sections by optic microscope and with the realization of spectrum of X-ray diffraction, in order to know the nature and composition, the state of preservation and the kinds of deterioration to support an appropriate intervention of restoration.

  15. [Restoration filtering based on projection power spectrum for single-photon emission computed tomography].

    Kubo, N

    1995-04-01

    To improve the quality of single-photon emission computed tomographic (SPECT) images, a restoration filter has been developed. This filter was designed according to practical "least squares filter" theory. It is necessary to know the object power spectrum and the noise power spectrum. The power spectrum is estimated from the power spectrum of a projection, when the high-frequency power spectrum of a projection is adequately approximated as a polynomial exponential expression. A study of the restoration with the filter based on a projection power spectrum was conducted, and compared with that of the "Butterworth" filtering method (cut-off frequency of 0.15 cycles/pixel), and "Wiener" filtering (signal-to-noise power spectrum ratio was a constant). Normalized mean-squared errors (NMSE) of the phantom, two line sources located in a 99mTc filled cylinder, were used. NMSE of the "Butterworth" filter, "Wiener" filter, and filtering based on a power spectrum were 0.77, 0.83, and 0.76 respectively. Clinically, brain SPECT images utilizing this new restoration filter improved the contrast. Thus, this filter may be useful in diagnosis of SPECT images.

  16. Sediment cores and chemistry for the Kootenai River White Sturgeon Habitat Restoration Project, Boundary County, Idaho

    Barton, Gary J.; Weakland, Rhonda J.; Fosness, Ryan L.; Cox, Stephen E.; Williams, Marshall L.

    2012-01-01

    The Kootenai Tribe of Idaho, in cooperation with local, State, Federal, and Canadian agency co-managers and scientists, is assessing the feasibility of a Kootenai River habitat restoration project in Boundary County, Idaho. This project is oriented toward recovery of the endangered Kootenai River white sturgeon (Acipenser transmontanus) population, and simultaneously targets habitat-based recovery of other native river biota. Projects currently (2010) under consideration include modifying the channel and flood plain, installing in-stream structures, and creating wetlands to improve the physical and biological functions of the ecosystem. River restoration is a complex undertaking that requires a thorough understanding of the river. To assist in evaluating the feasibility of this endeavor, the U.S. Geological Survey collected and analyzed the physical and chemical nature of sediment cores collected at 24 locations in the river. Core depths ranged from 4.6 to 15.2 meters; 21 cores reached a depth of 15.2 meters. The sediment was screened for the presence of chemical constituents that could have harmful effects if released during restoration activities. The analysis shows that concentrations of harmful chemical constituents do not exceed guideline limits that were published by the U.S. Army Corps of Engineers in 2006.

  17. Restoration filtering based on projection power spectrum for single-photon emission computed tomography

    Kubo, Naoki

    1995-01-01

    To improve the quality of single-photon emission computed tomographic (SPECT) images, a restoration filter has been developed. This filter was designed according to practical 'least squares filter' theory. It is necessary to know the object power spectrum and the noise power spectrum. The power spectrum is estimated from the power spectrum of a projection, when the high-frequency power spectrum of a projection is adequately approximated as a polynomial exponential expression. A study of the restoration with the filter based on a projection power spectrum was conducted, and compared with that of the 'Butterworth' filtering method (cut-off frequency of 0.15 cycles/pixel), and 'Wiener' filtering (signal-to-noise power spectrum ratio was a constant). Normalized mean-squared errors (NMSE) of the phantom, two line sources located in a 99m Tc filled cylinder, were used. NMSE of the 'Butterworth' filter, 'Wiener' filter, and filtering based on a power spectrum were 0.77, 0.83, and 0.76 respectively. Clinically, brain SPECT images utilizing this new restoration filter improved the contrast. Thus, this filter may be useful in diagnosis of SPECT images. (author)

  18. Color correction with blind image restoration based on multiple images using a low-rank model

    Li, Dong; Xie, Xudong; Lam, Kin-Man

    2014-03-01

    We present a method that can handle the color correction of multiple photographs with blind image restoration simultaneously and automatically. We prove that the local colors of a set of images of the same scene exhibit the low-rank property locally both before and after a color-correction operation. This property allows us to correct all kinds of errors in an image under a low-rank matrix model without particular priors or assumptions. The possible errors may be caused by changes of viewpoint, large illumination variations, gross pixel corruptions, partial occlusions, etc. Furthermore, a new iterative soft-segmentation method is proposed for local color transfer using color influence maps. Due to the fact that the correct color information and the spatial information of images can be recovered using the low-rank model, more precise color correction and many other image-restoration tasks-including image denoising, image deblurring, and gray-scale image colorizing-can be performed simultaneously. Experiments have verified that our method can achieve consistent and promising results on uncontrolled real photographs acquired from the Internet and that it outperforms current state-of-the-art methods.

  19. Classifications for Coastal Wetlands Planning, Protection and Restoration Act site-specific projects: 2008 and 2009

    Jones, William R.; Garber, Adrienne

    2012-01-01

    The Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA) funds over 100 wetland restoration projects across Louisiana. Integral to the success of CWPPRA is its long-term monitoring program, which enables State and Federal agencies to determine the effectiveness of each restoration effort. One component of this monitoring program is the analysis of high-resolution, color-infrared aerial photography at the U.S. Geological Survey's National Wetlands Research Center in Lafayette, Louisiana. Color-infrared aerial photography (9- by 9-inch) is obtained before project construction and several times after construction. Each frame is scanned on a photogrametric scanner that produces a high-resolution image in Tagged Image File Format (TIFF). By using image-processing software, these TIFF files are then orthorectified and mosaicked to produce a seamless image of a project area and its associated reference area (a control site near the project that has common environmental features, such as marsh type, soil types, and water salinities.) The project and reference areas are then classified according to pixel value into two distinct classes, land and water. After initial land and water ratios have been established by using photography obtained before and after project construction, subsequent comparisons can be made over time to determine land-water change. Several challenges are associated with the land-water interpretation process. Primarily, land-water classifications are often complicated by the presence of floating aquatic vegetation that occurs throughout the freshwater systems of coastal Louisiana and that is sometimes difficult to differentiate from emergent marsh. Other challenges include tidal fluctuations and water movement from strong winds, which may result in flooding and inundation of emergent marsh during certain conditions. Compensating for these events is difficult but possible by using other sources of imagery to verify marsh conditions for other

  20. Restoration projects for decontamination of facilities from chemical, biological and radiological contamination after terrorist actions

    Fingas, M.; Volchek, K.; Lumley, T.; Thouin, G.; Harrison, S.; Kuang, W. [Environment Canada, Ottawa, ON (Canada). Emergencies Science and Technology Division, Environmental Technology Centre, Science and Technology Branch; Payette, P.; Laframboise, D.; Best, M. [Public Health Agency of Canada, Ottawa, ON (Canada); Krishnan, J.; Wagener, S.; Bernard, K.; Majcher, M. [Public Health Agency of Canada, Winnipeg, MB (Canada); Cousins, T.; Jones, T. [Defence Research and Development Canada, Ottawa, ON (Canada); Velicogna, D.; Hornof, M.; Punt, M. [SAIC Canada, Ottawa, ON (Canada)

    2006-07-01

    This paper reviewed studies that identified better decontamination methods for chemical, biological and radiological/nuclear (CBRN) attacks. In particular, it reviewed aspects of 3 projects in which procedures were tested and validated for site restoration. Cleanup targets or standards for decontaminating buildings and materials after a CBRN attack were also developed. The projects were based on physicochemical and toxicological knowledge of potential terrorist agents and selected surface matrices. The projects also involved modeling and assessing environmental and health risks. The first multi-agent project involved gathering information on known procedures for restoration of areas including interiors and exteriors of buildings, contents, parking lots, lawn, and vehicles. Air inside the building was included. The efficacy of some of the proposed concepts was tested. Results included the determination of appropriate surrogates for anthrax and tests of liquid and gaseous biocides on the surrogates. The development of new contamination procedures using peroxyacetic acid were also discussed. The second project involved decontamination tests on CBRN using specially-constructed buildings at the Counter-terrorism Technology Centre at Defence Research and Development Canada in Suffield. The buildings will be contaminated with chemical and biological agents and with short-lived radionuclides. They will be decontaminated using the best-performing technologies known. Information collected will include fate of the contaminant and decontamination products, effectiveness of the restoration methods, cost and duration of cleanup and logistical problems. The third project is aimed at developing cleanup standards for decontaminating buildings and construction materials after a chemical or biological attack. It will create as many as 12 algorithms for the development of 50 standards which will help cleanup personnel and first-responders to gauge whether proposed methods can achieve

  1. Towards a decision support system for stream restoration in the Netherlands: an overview of restoration projects and future needs

    Verdonschot, P.F.M.; Nijboer, R.C.

    2002-01-01

    Stream restoration is one of the answers to the lowland stream deterioration. For making proper choices in stream restoration, one firstly needs to understand the complex spatial and temporal interactions between physical, chemical and biological components in the stream ecosystem. Several

  2. The restoration project : decontamination of facilities from chemical, biological and radiological contamination after terrorist action

    Fingas, M.; Volchek, K.; Thouin, G.; Harrison, S.; Kuang, W. [Environment Canada, Ottawa, ON (Canada). Emergencies Science Div; Velicogna, D.; Hornof, M.; Punt, M. [SAIC Canada, Ottawa, ON (Canada); Payette, P.; Duncan, L.; Best, M.; Krishnan; Wagener, S.; Bernard, K.; Majcher, M. [Public Health Agency of Canada, Ottawa, ON (Canada); Cousins, T.; Jones, T. [Defence Research and Development Canada, Ottawa, ON (Canada)

    2005-07-01

    Bioterrorism poses a real threat to the public health and national security, and the restoration of affected facilities after a chemical, biological or radiological attack is a major concern. This paper reviewed aspects of a project conducted to collect information, test and validate procedures for site restoration after a terrorist attack. The project began with a review of existing technology and then examined new technologies. Restoration included pickup, neutralization, decontamination, removal and final destruction and deposition of contaminants as well as cleaning and neutralization of material and contaminated waste from decontamination. The project was also intended to test existing concepts and develop new ideas. Laboratory scale experiments consisted of testing, using standard laboratory techniques. Radiation decontamination consisted of removal and concentration of the radioisotopes from removal fluid. General restoration guidelines were provided, as well as details of factors considered important in specific applications, including growth conditions and phases of microorganisms in biological decontamination, or the presence of inhibitors or scavengers in chemical decontamination. Various agents were proposed that were considered to have broad spectrum capability. Test surrogates for anthrax were discussed. The feasibility of enhanced oxidation processes was examined in relation to the destruction of organophosphorus, organochlorine and carbamate pesticides. The goal was to identify a process for the treatment of surfaces contaminated with pesticides. Tests included removal from carpet, porous ceiling tile, steel plates, and floor tiles. General radiation contamination procedures and techniques were reviewed, as well as radiological decontamination waste treatment. It was concluded that there is no single decontamination technique applicable for all contaminants, and decontamination methods depend on economic, social and health factors. The amount of

  3. Recommendations for computer modeling codes to support the UMTRA groundwater restoration project

    Tucker, M.D. [Sandia National Labs., Albuquerque, NM (United States); Khan, M.A. [IT Corp., Albuquerque, NM (United States)

    1996-04-01

    The Uranium Mill Tailings Remediation Action (UMTRA) Project is responsible for the assessment and remedial action at the 24 former uranium mill tailings sites located in the US. The surface restoration phase, which includes containment and stabilization of the abandoned uranium mill tailings piles, has a specific termination date and is nearing completion. Therefore, attention has now turned to the groundwater restoration phase, which began in 1991. Regulated constituents in groundwater whose concentrations or activities exceed maximum contaminant levels (MCLs) or background levels at one or more sites include, but are not limited to, uranium, selenium, arsenic, molybdenum, nitrate, gross alpha, radium-226 and radium-228. The purpose of this report is to recommend computer codes that can be used to assist the UMTRA groundwater restoration effort. The report includes a survey of applicable codes in each of the following areas: (1) groundwater flow and contaminant transport modeling codes, (2) hydrogeochemical modeling codes, (3) pump and treat optimization codes, and (4) decision support tools. Following the survey of the applicable codes, specific codes that can best meet the needs of the UMTRA groundwater restoration program in each of the four areas are recommended.

  4. Recommendations for computer modeling codes to support the UMTRA groundwater restoration project

    Tucker, M.D.; Khan, M.A.

    1996-04-01

    The Uranium Mill Tailings Remediation Action (UMTRA) Project is responsible for the assessment and remedial action at the 24 former uranium mill tailings sites located in the US. The surface restoration phase, which includes containment and stabilization of the abandoned uranium mill tailings piles, has a specific termination date and is nearing completion. Therefore, attention has now turned to the groundwater restoration phase, which began in 1991. Regulated constituents in groundwater whose concentrations or activities exceed maximum contaminant levels (MCLs) or background levels at one or more sites include, but are not limited to, uranium, selenium, arsenic, molybdenum, nitrate, gross alpha, radium-226 and radium-228. The purpose of this report is to recommend computer codes that can be used to assist the UMTRA groundwater restoration effort. The report includes a survey of applicable codes in each of the following areas: (1) groundwater flow and contaminant transport modeling codes, (2) hydrogeochemical modeling codes, (3) pump and treat optimization codes, and (4) decision support tools. Following the survey of the applicable codes, specific codes that can best meet the needs of the UMTRA groundwater restoration program in each of the four areas are recommended

  5. Have wet meadow restoration projects in the Southwestern U.S. been effective in restoring geomorphology, hydrology, soils, and plant species composition?

    Ramstead Karissa M

    2012-09-01

    Full Text Available Abstract Background Wet meadows occur in numerous locations throughout the American Southwest, but in many cases have become heavily degraded. Among other things they have frequently been overgrazed and have had roads built through them, which have affected the hydrology of these wetland ecosystems. Because of the important hydrologic and ecological functions they are believed to perform, there is currently significant interest in wet meadow restoration. Several restoration projects have been completed recently or are underway in the region, sometimes at considerable expense and with minimal monitoring. The objective of this review was to evaluate the effects of wet meadow restoration projects in the southwestern United States on geomorphology, hydrology, soils and plant species composition. A secondary objective was to determine the effects of wet meadow restoration projects on wildlife. Methods Electronic databases, internet search engines, websites and personal contacts were used to find articles of relevance to this review. Articles were filtered by title, abstract and full text. Summary information for each of the articles remaining after the filtering process was compiled and used to assess the quality of the evidence presented using two different approaches. Results Our searches yielded 48 articles, of which 25 were published in peer-reviewed journals, 14 were monitoring or project reports, and 9 were published in conference proceedings or are unpublished theses or manuscripts. A total of 26 operational-scale restoration projects were identified. A wide range of restoration techniques were employed, ranging from small-scale manipulations of stream channels (e.g., riffle structures to large scale pond-and-plug projects. Other common restoration techniques included fencing to exclude livestock (and sometimes also native ungulates, other forms of grazing management, seeding, and transplanting seedlings. Most of the articles reported that

  6. Landowner and visitor response to forest landscape restoration: the Chequamegon-Nicolet National Forest Northeast Sands Project

    Kristin Floress; Anna Haines; Emily Usher; Paul Gobster; Mike. Dockry

    2018-01-01

    This report is intended to support the ongoing pine barrens restoration on work in the Lakewood-Laona Ranger District on the Chequamegon-Nicolet National Forest (CNNF). The report provides the results from 2016 surveys and focus groups examining landowner and visitor attitudes toward forest management treatments, communication, and restoration project outcomes; their...

  7. 76 FR 70480 - Otay River Estuary Restoration Project, South San Diego Bay Unit of the San Diego Bay National...

    2011-11-14

    ... River Estuary Restoration Project, South San Diego Bay Unit of the San Diego Bay National Wildlife...), intend to prepare an environmental impact statement (EIS) for the proposed Otay River Estuary Restoration... any one of the following methods. Email: [email protected] . Please include ``Otay Estuary NOI'' in the...

  8. Restoration of the analytically reconstructed OpenPET images by the method of convex projections

    Tashima, Hideaki; Murayama, Hideo; Yamaya, Taiga [National Institute of Radiological Sciences, Chiba (Japan); Katsunuma, Takayuki; Suga, Mikio [Chiba Univ. (Japan). Graduate School of Engineering; Kinouchi, Shoko [National Institute of Radiological Sciences, Chiba (Japan); Chiba Univ. (Japan). Graduate School of Engineering; Obi, Takashi [Tokyo Institute of Technology (Japan). Interdisciplinary Graduate School of Science and Engineering; Kudo, Hiroyuki [Tsukuba Univ. (Japan). Graduate School of Systems and Information Engineering

    2011-07-01

    We have proposed the OpenPET geometry which has gaps between detector rings and physically opened field-of-view. The image reconstruction of the OpenPET is classified into an incomplete problem because it does not satisfy the Orlov's condition. Even so, the simulation and experimental studies have shown that applying iterative methods such as the maximum likelihood expectation maximization (ML-EM) algorithm successfully reconstruct images in the gap area. However, the imaging process of the iterative methods in the OpenPET imaging is not clear. Therefore, the aim of this study is to analytically analyze the OpenPET imaging and estimate implicit constraints involved in the iterative methods. To apply explicit constraints in the OpenPET imaging, we used the method of convex projections for restoration of the images reconstructed by the analytical way in which low-frequency components are lost. Numerical simulations showed that the similar restoration effects are involved both in the ML-EM and the method of convex projections. Therefore, the iterative methods have advantageous effect of restoring lost frequency components of the OpenPET imaging. (orig.)

  9. Project Management Support and Services for the Environmental Restoration and Waste Management. Final report

    1995-01-01

    The Los Alamos National Laboratory (LANL) Environmental Restoration Technical Support Office (ERTSO) contracted Project Time ampersand Cost, Inc. (PT ampersand C) on 16 November 1992 to provide support services to the US Department of Energy (DOE). ERTSO had traditionally supported the DOE Albuquerque office in the Environmental Restoration and Waste Management Programs and had also supported the Office of Waste Management (EM-30) at DOE Headquarters in Germantown, Maryland. PT ampersand C was requested to provide project management and support services for the DOE as well as liaison and coordination of responses and efforts between various agencies. The primary objective of this work was to continue LANL's technical support role to EM-30 and assist in the development of the COE Cost and Schedule Estimating (CASE) Guide for EM-30. PT ampersand C's objectives, as specified in Section B of the contract, were well met during the duration of the project through the review and comment of various draft documents, trips to DOE sites providing program management support and participating in the training for the EM-30 Cost and Schedule Estimating Guide, drafting memos and scheduling future projects, attending numerous meetings with LANL, DOE and other subcontractors, and providing written observations and recommendations.he results obtained were determined to be satisfactory by both the LANL ERTSO and DOE EM-30 organizations. The objective to further the support from LANL and their associated subcontractor (PT ampersand C) was met. The contract concluded with no outstanding issues

  10. The Carolina Bay Restoration Project - Status Report II 2000-2004.

    Barton, Christopher

    2006-07-13

    A Wetlands Mitigation Bank was established at SRS in 1997 as a compensatory alternative for unavoidable wetland losses. Prior to restoration activities, 16 sites included in the project were surveyed for the SRS Site Use system to serve as a protective covenant. Pre-restoration monitoring ended in Fall 2000, and post restoration monitoring began in the Winter/Spring of 2001. The total interior harvest in the 16 bays after harvesting the trees was 19.6 ha. The margins in the opencanopy, pine savanna margin treatments were thinned. Margins containing areas with immature forested stands (bay 5184 and portions of bay 5011) were thinned using a mechanical shredder in November 2001. Over 126 hectares were included in the study areas (interior + margin). Planting of two tree species and the transplanting of wetland grass species was successful. From field surveys, it was estimated that approximately 2700 Nyssa sylvatica and 1900 Taxodium distichum seedlings were planted in the eight forested bays resulting in an average planting density of ≈ 490 stems ha-1. One hundred seedlings of each species per bay (where available) were marked to evaluate survivability and growth. Wetland grass species were transplanted from donor sites on SRS to plots that ranged in size from 100 – 300 m2, depending on wetland size. On 0.75 and 0.6 meter centers, respectively, 2198 plugs of Panicum hemitomon and 3021 plugs Leersia hexandra were transplanted. New shoots originating from the stumps were treated with a foliar herbicide (Garlon® 4) during the summer of 2001 using backpack sprayers. Preliminary information from 2000-2004 regarding the hydrologic, vegetation and faunal response to restoration is presented in this status report. Post restoration monitoring will continue through 2005. A final report to the Mitigation Bank Review Team will be submitted in mid-2006.

  11. Restoration of groundwater after solution mining at the Highland Uranium Project, Wyoming, USA

    Hunter, J. [Waste Technology Group, British Nuclear Fuels PLC, Risley, Warrington (United Kingdom); Huffman, L. [Power Resources Inc., Highland Uranium Mine, Glenrock, Wyoming (United States)

    2000-07-01

    The Highland Project, located in Converse County, Wyoming, has had a successful 11 year history of in-situ leach mining of Tertiary roll-front uranium deposits. The uranium ore is oxidized and solubilized by circulating native groundwater, containing additional dissolved O{sub 2} and CO{sub 2}, within confined fluvial aquifers at depths of 200 - 250 m. The changing chemistry of this groundwater during leaching is discussed, as are the various treatment techniques that have been used to restore this fluid at the end of mining. Examples are provided which demonstrate the varying effectiveness of each technique for the reduction of elevated concentrations of different groundwater parameters. The complications arising from the proximity of the earliest wellfields to abandoned, conventional mine workings, as well as unexpected side effects from each restoration method, have combined to make an interesting case history from this long established mining operation. (author)

  12. Diversified Native Species Restoration for Recovery of Multiple Ecosystem Services in a Highly Disturbed Tropical Dry Forest Landscape of Southwestern Nicaragua

    Williams-Guillen, K.; Otterstrom, S.; Perla, C.

    2015-12-01

    Tropical dry forests have been reduced to a fraction of their original extent in the Neotropics due to conversion to agriculture and cattle pasture. While TDF can recover via natural regeneration, resulting forests are dominated by wind-dispersed pioneer species of limited value for frugivorous wildlife. Additionally, passive restoration can be perceived as "abandonment" resulting in neighbors casually invading property to rear livestock and extract timber. In 2007, the NGO Paso Pacífico initiated restoration in a highly degraded tropical dry forest landscape of southwestern Nicaragua; funded by an ex-ante carbon purchase, the project was designed to integrate multiple native tree species known to provide resources used by local wildlife. We restored roughly 400 hectares spanning a rainfall gradient from dry to transitional moist forest, using reforestation (planting 70 species of tree seedlings in degraded pastures on a 4x4 m grid, leaving occurring saplings) and assisted regeneration (clearing vines and competing vegetation from saplings in natural regeneration and strategically managing canopy cover). In just over seven years, mean carbon increased nearly threefold, from to 21.5±5.0 to 57.9±9.6 SE tonnes/ha. Current carbon stocks match those of 20-year-old forests in the area, accumulated in less than a decade. Stem density per 15-m radius plot decreased from 16.3±2.3 to 12.5±0.9 SE, while species richness increased from 3.9±0.4 to 18.4±1.4 SE. Alpha richness of woody stems across plots increased from 36 to 94 species, and over 20 tree species established as a result of natural dispersal and recruitment. We have observed sensitive species such as spider monkeys and parrots foraging in restoration areas. Managed reforestation is a highly effective method for rapidly restoring the functionality of multiple ecosystem services in degraded TDF, particularly when social and political realities force restoration to coexist with human productive activities

  13. Restoration and construction (buildings). Solar electric power. How to complete a photovoltaic project

    Bareau, Helene; Juniere, Olivier

    2017-10-01

    This brochure, edited by ADEME, the French office for energy management and sustainable development, gives a basic but comprehensive outlook on the way to complete a solar photovoltaic project in the cases of the restoration or the construction of a building. After a presentation of solar energy, its transformation into electric power, and the installation of solar photovoltaic panels and equipment, the brochure exposes the various steps of a photovoltaic project: economic analysis (cost estimation, budgets, financing incentives, power prices, the choice between selling or using electric power, the contracts, etc.), the planning of the project, the administrative procedure, the selection of a professional installer, how to run the photovoltaic system, how to run the business, etc

  14. Los Alamos National Laboratory Environmental Restoration Project quarterly technical report, April--June 1994

    1994-08-18

    This quarterly report describes the technical status of activities in the Los Alamos National Laboratory Environmental Restoration (ER) Project. Each activity is identified by an activity data sheet number, a brief title describing the activity or the technical area where the activity is located, and the name of the project leader. The Hazardous and Solid Waste Amendments (HSWA) portion of the facility operating permit requires the submission of a technical progress report on a quarterly basis. This report, submitted to fulfill the permit`s requirement, summarizes the work performed and the results of sampling and analysis in the ER Project. Suspect waste found include: Radionuclides, high explosives, metals, solvents and organics. The data provided in this report have not been validated. These data are considered ``reviewed data.``

  15. Independent technical review of the Sandia National Laboratories Environmental Restoration Project

    1994-11-01

    An Independent Technical Review was conducted of the Environmental Restoration Project. The objective of the review was recommendations, from a commercial perspective, on a systems level path forward to safe, minimum cost and schedule project completion. The work presented represents the consensus analysis and recommendations of thirteen individuals with varied backgrounds, expertise, and experience. The ITR team recommends that the barriers to the opportunity described in the diagnosis be eliminated using an integrated DOE-Sandia system approach. Piecemeal changes will not result in the desired commercial efficiency. DOE needs to operate as the contracting agency for a Major System Acquisition. If it does not, commercial performance will not be achieved regardless of the contractor. Likewise, Sandia needs to establish and implement the necessary project structure and management systems to operate with commercial contractor like efficiency

  16. Hangman Restoration Project : Annual Report, August 1, 2001 - July 31, 2002.

    Green, Gerald I.; Coeur D' Alene Tribe.

    2002-06-01

    The construction of hydroelectric facilities in the Columbia Basin resulted in the extirpation of anadromous fish stocks in Hangman Creek and its tributaries within the Coeur d'Alene Reservation. Thus, the Coeur d'Alene Indian Tribe was forced to rely more heavily on native fish stocks such as redband trout (Oncorhynchus mykiss garideini), westslope cutthroat trout (O. clarki lewisii) and bull trout (Salvelinus confluentus) as well as local wildlife populations. Additionally, the Tribe was forced to convert prime riparian habitat into agricultural lands to supply sustenance for their changed needs. Wildlife habitats within the portion of the Hangman Creek Watershed that lies within the Coeur d'Alene Indian Reservation have been degraded from a century of land management practices that include widespread conversion of native habitats to agricultural production and intensive silvicultural practices. Currently, wildlife and fish populations have been marginalized and water quality is significantly impaired. In the fall of 2000 the Coeur d'Alene Tribe Wildlife Program, in coordination with the Tribal Fisheries Program, submitted a proposal to begin addressing the degradations to functioning habitats within the Coeur d'Alene Reservation in the Hangman Watershed. That proposal led to the implementation of this project during BPA's FY2001 through FY2003 funding cycle. The project is intended to protect, restore and/or enhance priority riparian, wetland and upland areas within the headwaters of Hangman Creek and its tributaries in order to promote healthy self-sustaining fish and wildlife populations. A key goal of this project is the implementation of wildlife habitat protection efforts in a manner that also secures areas with the potential to provide stream and wetland habitats essential to native salmonid populations. This goal is critical in our efforts to address both resident fish and wildlife habitat needs in the Hangman Watershed. All

  17. Sulimar Queen environmental restoration project closure package Sandia environmental stewardship exemplar.

    Tillman, Jack B.

    2008-09-01

    In March 2008, Sandia National Laboratories (Sandia), in partnership with the Bureau of Land Management, Roswell Field Office, completed its responsibilities to plug and abandon wells and restore the surface conditions for the Sulimar Queens Unit, a 2,500 acre oil field, in Chaves County, Southeast New Mexico. Sandia assumed this liability in an agreement to obtain property to create a field laboratory to perform extensive testing and experimentation on enhanced oil recovery techniques for shallow oil fields. In addition to plugging and abandoning 28 wells, the project included the removal of surface structures and surface reclamation of disturbed lands associated with all plugged and abandoned wells, access roads, and other auxiliary facilities within unit boundaries. A contracting strategy was implemented to mitigate risk and reduce cost. As the unit is an important wildlife habitat for prairie chickens, sand dune lizards, and mule deer, the criteria for the restoration and construction process were designed to protect and enhance the wildlife habitat. Lessons learned from this project include: (1) extreme caution should be exercised when entering agreements that include future liabilities, (2) partnering with the regulator has huge benefits, and (3) working with industry experts, who were familiar with the work, and subcontractors, who provided the network to complete the project cost effectively.

  18. Meeting the requirements for a DOE environmental restoration project. The Fernald strategy

    Vanoss, R.L.; Risenhoover, G.M.

    1994-01-01

    Environmental Restoration (ER) of five Operable Units (OU) at Fernald Environmental Management Project (FEMP) includes compliance with the requirements of Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), Resource Conservation Recovery Act (RCRA), National Environmental Policy Act (NEPA), and DOE Orders. Each regulatory driver has differing procedural requirements for documenting calculations, decisions, and actions involved in site cleanup. Integration of documentation and avoidance of duplication can save time and money. Such savings are being achieved by OU specific application of supporting studies, revised procedures, and guidance documents. Each OU is seeking appropriate opportunities to produce single documents that simultaneously fulfill the important requirements of the other regulations and DOE orders. These opportunities are evaluated at all phases of decision making, remedial design, and remedial action. Three essential processes precede environmental restoration/remedial action at a DOE site/project: 1. Completion of decision-making documents required by governing or applicable statutes. 2. Completion of important scientific and engineering analyses of remedial alternatives, and design and implementation of the remedial solution established in the CERCLA Record of Decision (ROD). 3. Preparation of DOE-mandated documentation to record engineering evaluations and cost estimates required for budgeting, decision making, and project management. Methodology and requirements for each process have developed from long, successful practice, but independently of each other. FERMCO, as new DOE contractor at Fernald and first Environmental Restoration Management Contractor (ERMC), is committed to a process of Continuous Performance Improvement (CPI). A major reevaluation of documentation and processes for support of environmental decision-making and design of cleanup activities to remediate the five OUs at the FEMP is being undertaken

  19. Summary of operations and performance of the Murdock site restoration project in 2008.

    LaFreniere, L. M.; Environmental Science Division

    2009-06-04

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the third full year of system operation, from January 1 through December 31, 2008. Performance in June 2005 through December 2007 was reported previously (Argonne 2007, 2008). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix A.

  20. The 12-foot pressure wind tunnel restoration project model support systems

    Sasaki, Glen E.

    1992-01-01

    The 12 Foot Pressure Wind Tunnel is a variable density, low turbulence wind tunnel that operates at subsonic speeds, and up to six atmospheres total pressure. The restoration of this facility is of critical importance to the future of the U.S. aerospace industry. As part of this project, several state of the art model support systems are furnished to provide an optimal balance between aerodynamic and operational efficiency parameters. Two model support systems, the Rear Strut Model Support, and the High Angle of Attack Model Support are discussed. This paper covers design parameters, constraints, development, description, and component selection.

  1. Summary of operations and performance of the Murdock site restoration project in June 2005-December 2006.

    LaFreniere, L. M.; Environmental Science Division

    2007-05-31

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the initial period of systems operation, from June 2005 through December 2006. In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the initial period of operation.

  2. Flood effects on an Alaskan stream restoration project: the value of long-term monitoring

    Densmore, Roseann V.; Karle, Kenneth F.

    2009-01-01

    On a nationwide basis, few stream restoration projects have long-term programs in place to monitor the effects of floods on channel and floodplain configuration and floodplain vegetation, but long-term and event-based monitoring is required to measure the effects of these stochastic events and to use the knowledge for adaptive management and the design of future projects. This paper describes a long-term monitoring effort (15 years) on a stream restoration project in Glen Creek in Denali National Park and Preserve in Alaska. The stream channel and floodplain of Glen Creek had been severely degraded over a period of 80 years by placer mining for gold, which left many reaches with unstable and incised streambeds without functioning vegetated floodplains. The objectives of the original project, initiated in 1991, were to develop and test methods for the hydraulic design of channel and floodplain morphology and for floodplain stabilization and riparian habitat recovery, and to conduct research and monitoring to provide information for future projects in similar degraded watersheds. Monitoring methods included surveyed stream cross-sections, vegetation plots, and aerial, ground, and satellite photos. In this paper we address the immediate and outlying effects of a 25-year flood on the stream and floodplain geometry and riparian vegetation. The long-term monitoring revealed that significant channel widening occurred following the flood, likely caused by excessive upstream sediment loading and the fairly slow development of floodplain vegetation in this climate. Our results illustrated design flaws, particularly in regard to identification and analysis of sediment sources and the dominant processes of channel adjustment.

  3. Linking Multiple Databases: Term Project Using "Sentences" DBMS.

    King, Ronald S.; Rainwater, Stephen B.

    This paper describes a methodology for use in teaching an introductory Database Management System (DBMS) course. Students master basic database concepts through the use of a multiple component project implemented in both relational and associative data models. The associative data model is a new approach for designing multi-user, Web-enabled…

  4. MULTIPLE PROJECTIONS SYSTEM (MPS) - USER'S MANUAL VERSION 1.0

    The report is a user's manual for version 1.0 of the Multiple Projections Systems (MPS), a computer system that can perform "what if" scenario analysis and report the final results (i.e., Rate of Further Progress - ROP - inventories) to EPA (i.e., the Aerometric Information Retri...

  5. Viking GCMS Data Restoral and Perceiving Temperature on Other Worlds: Astrobiology Projects at NASA Ames

    Guzman, Melissa

    2015-01-01

    The primary task for the summer was to procure the GCMS data from the National Space Science Data Coordinated Archive (NSSDCA) and to assess the current state of the data set for possible reanalysis opportunities. After procurement of the Viking GCMS data set and analysis of its current state, the internship focus shifted to preparing a plan for restoral and archiving of the GCMS data set. A proposal was prepared and submitted to NASA Headquarters to restore and make available the 8000 mass chromatographs that are the basic data generated by the Viking GCMS instrument. The relevance of this restoral and the methodology we propose for restoral is presented. The secondary task for the summer is to develop a thermal model for the perceived temperature of a human standing on Mars, Titan, or Europa. Traditionally, an equation called "Fanger's comfort equation" is used to measure the perceived temperature by a human in a given reference environment. However, there are limitations to this model when applied to other planets. Therefore, the approach for this project has been to derive energy balance equations from first principles and then develop a methodology for correlating "comfort" to energy balance. Using the -20 C walk-in freezer in the Space Sciences building at NASA Ames, energy loss of a human subject is measured. Energy loss for a human being on Mars, Titan and Europa are calculated from first principles. These calculations are compared to the freezer measurements, e.g. for 1 minute on Titan, a human loses as much energy as x minutes in a -20 C freezer. This gives a numerical comparison between the environments. These energy calculations are used to consider the physiological comfort of a human based on the calculated energy losses.

  6. Restoring of offshore wind farm sites. Lillgrund Pilot Project; Aaterstaellande av havsbaserad vindkraft. Lillgrund Pilot Projekt

    Stumle Wikander, Jhenny (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2009-02-15

    This report focuses on the legal aspects of decommissioning and restoring of offshore wind farm sites, as part of an extensive report on the Lillgrund Offshore Wind Farm Pilot Project. For this analysis, all permit conditions of the granted permits for the offshore wind parks in Sweden have been collected and studied. According to the Swedish Environmental code 'the validity of a permit, approval or exemption may be made subject to the requirement that the person who intends to pursue the activity must furnish a security for the costs of after-treatment and any other restoration measures that may be necessary as a result. The state, municipalities, county councils and associations of municipalities shall not be required to furnish a security. If there is cause to assume that the security furnished is no longer sufficient, the authority which is considering the application for a permit, approval or exemption may require an additional security to be furnished'. The permits show that different types of securities are being used, with bank warranties and securities being the most common. Securities are either fixed and furnished prior to start of construction or start of operations, or they are obtained gradually over the life of the project. Among the twelve permits studied, a gradual tendency to use a combination of the two alternatives can bee seen. The conditions governing when an offshore wind farm is to be discontinued and which parts need to be partly or fully removed from the site are obviously of future importance. The issue has been addressed to different degrees in the permits, some to a clear legal extent, while others are more general. The Lillgrund Offshore Wind Farm was secured for 60 million SEK. The extent to which the park is to be decommissioned and the site to be restored is decided by the county administrative board once production is terminated

  7. Advanced Monitoring Systems Initiative Project Achievements for Environmental Restoration and Waste Management

    Hohman, E.H.; Lohrstorfer, C.L.; Venedam, R.J.; Weeks, S.J.; Fannin, C.R.

    2006-01-01

    The Advanced Monitoring Systems Initiative (AMSI) project has been in existence since 2002. In this short time period, AMSI has successfully developed, tested and/or demonstrated over 30 advanced sensors and monitoring systems for applications in environmental restoration, waste management and other areas of national interest. This presentation summarizes the AMSI project, and gives examples of recent successes. The purpose of the presentation is to make Symposium attendees aware of AMSI's capabilities and experience, for possible use in the future. Example successes include the following: - Automated hexavalent chromium (Cr(VI)) monitoring in wells alongside the Columbia River; - Atmospheric chemical sensor array for remote, real-time plume tracking; - Wireless sensor platform for long-term monitoring of subsurface moisture; - Embedded piezo-resistive micro-cantilever (EPM) units for carbon tetrachloride (CCl 4 ) and hydrogen cyanide (HCN) detection; - 'iHistorian' for efficient, real-time data management of chemical releases. (authors)

  8. Test and evaluation plan for Project W-314 tank farm restoration and safe operations

    Hays, W.H.

    1998-01-01

    The ''Tank Farm Restoration and Safe Operations'' (TFRSO), Project W-314 will restore and/or upgrade existing Hanford Tank Farm facilities and systems to ensure that the Tank Farm infrastructure will be able to support near term TWRS Privatization's waste feed delivery and disposal system and continue safe management of tank waste. The capital improvements provided by this project will increase the margin of safety for Tank Farms operations, and will aid in aligning affected Tank Farm systems with compliance requirements from applicable state, Federal, and local regulations. Secondary benefits will be realized subsequent to project completion in the form of reduced equipment down-time, reduced health and safety risks to workers, reduced operating and maintenance costs, and minimization of radioactive and/or hazardous material releases to the environment. The original regulatory (e.g., Executive Orders, WACS, CFRS, permit requirements, required engineering standards, etc.) and institutional (e.g., DOE Orders, Hanford procedures, etc.) requirements for Project W-314 were extracted from the TWRS S/RIDs during the development of the Functions and Requirements (F and Rs). The entire family of requirements were then validated for TWRS and Project W-314. This information was contained in the RDD-100 database and used to establish the original CDR. The Project Hanford Management Contract (PHMC) team recognizes that safety, quality, and cost effectiveness in the Test and Evaluation (T and E) program is achieved through a planned systematic approach to T and E activities. It is to this end that the Test and Evaluation Plan (TEP) is created. The TEP for the TFRSO Project, was developed based on the guidance in HNF-IP-0842, and the Good Practice Guide GPG-FM-005, ''Test and Evaluation,'' which is derived from DOE Order 430.1, ''Life Cycle Asset Management.'' It describes the Test and Evaluation program for the TFRSO project starting with the definitive design phase and ending

  9. Image restoration by the method of convex projections: part 1 theory.

    Youla, D C; Webb, H

    1982-01-01

    A projection operator onto a closed convex set in Hilbert space is one of the few examples of a nonlinear map that can be defined in simple abstract terms. Moreover, it minimizes distance and is nonexpansive, and therefore shares two of the more important properties of ordinary linear orthogonal projections onto closed linear manifolds. In this paper, we exploit the properties of these operators to develop several iterative algorithms for image restoration from partial data which permit any number of nonlinear constraints of a certain type to be subsumed automatically. Their common conceptual basis is as follows. Every known property of an original image f is envisaged as restricting it to lie in a well-defined closed convex set. Thus, m such properties place f in the intersection E(0) = E(i) of the corresponding closed convex sets E(1),E(2),...EE(m). Given only the projection operators PE(i) onto the individual E(i)'s, i = 1 --> m, we restore f by recursive means. Clearly, in this approach, the realization of the P(i)'s in a Hilbert space setting is one of the major synthesis problems. Section I describes the geometrical significance of the three main theorems in considerable detail, and most of the underlying ideas are illustrated with the aid of simple diagrams. Section II presents rules for the numerical implementation of 11 specific projection operators which are found to occur frequently in many signal-processing applications, and the Appendix contains proofs of all the major results.

  10. Multiple Perspectives on Organizing: projects between tyranny and perforation

    Koch, Christian; Bendixen, Mads

    2005-01-01

    engineering organizations are the need for multiple organizing principles and management to bridge contradictory and competing concerns for skill development, resource alignment and innovation efforts; and a strong need to focus on soft management practices such as mediation, brokering and coaching....... its projects and the spatial/community dimension. This enables an understanding of the multiple, often contrasting, organizing dynamics in the organization as well as diverse interests and groups found within this type of organization. It finds that it is not only the clients of the company who rule...

  11. Wind River Watershed Restoration Project; Underwood Conservation District, Annual Report 2002-2003.

    White, Jim

    2004-02-01

    The goal of the Wind River project is to preserve, protect and restore Wind River steelhead. In March, 1998, the National Marine Fisheries Service listed the steelhead of the lower Columbia as 'threatened' under the Endangered Species Act. In 1997, the Washington Department of Fish and Wildlife rated the status of the Wind River summer run steelhead as critical. Due to the status of this stock, the Wind River summer steelhead have the highest priority for recovery and restoration in the state of Washington's Lower Columbia Steelhead Conservation Initiative. The Wind River Project includes four cooperating agencies. Those are the Underwood Conservation District (UCD), United States Geological Service (USGS), US Forest Service (USFS), and Washington State Department of Fish & Wildlife (WDFW). Tasks include monitoring steelhead populations (USGS and WDFW), Coordinating a Watershed Committee and Technical Advisory Group (UCD), evaluating physical habitat conditions (USFS and UCD), assessing watershed health (all), reducing road sediments sources (USFS), rehabilitating riparian corridors, floodplains, and channel geometry (UCD, USFS), evaluate removal of Hemlock Dam (USFS), and promote local watershed stewardship (UCD, USFS). UCD's major efforts have included coordination of the Wind River Watershed Committee and Technical Advisory Committee (TAC), water temperature and water chemistry monitoring, riparian habitat improvement projects, and educational activities. Our coordination work enables the local Watershed Committee and TAC to function and provide essential input to Agencies, and our habitat improvement work focuses on riparian revegetation. Water chemistry and temperature data collection provide information for monitoring watershed conditions and fish habitat, and are comparable with data gathered in previous years. Water chemistry information collected on Trout Creek should, with 2 years data, determine whether pH levels make conditions

  12. Settling characteristics of fine-grained sediments used in Louisiana coastal land building and restoration projects

    Ghose Hajra, M.

    2016-02-01

    Coastal property development, sea level rise, geologic subsidence, loss of barrier islands, increasing number and intensity of coastal storms and other factors have resulted in water quality degradation, wetlands loss, reduced storm and surge protection, ground settlement, and other challenges in coastal areas throughout the world. One of the goals towards reestablishing a healthy coastal ecosystem is to rebuild wetlands with river diversion or sediment conveyance projects that optimally manage and allocate sediments, minimally impact native flora and fauna, and positively affect the water quality. Engineering properties and material characteristics of the dredged material and foundation soils are input parameters in several mathematical models used to predict the long term behavior of the dredged material and foundation soil. Therefore, proper characterization of the dredged material and foundation soils is of utmost importance in the correct design of a coastal restoration and land reclamation project. The sedimentation and consolidation characteristics of the dredged material as well as their effects on the time rate of settlement of the suspended solid particles and underlying foundation soil depend, among other factors, on the (a) grain size distribution of the dredged material, (b) salinity (fresh, brackish, or saltwater environment) of the composite slurry, and (c) concentration of the solid particles in the slurry. This paper will present the results from column settling tests and self-weight consolidation tests performed on dredged samples obtained from actual restoration projects in Louisiana. The effects of salinity, grain size distribution, and initial particle concentration on the sedimentation and consolidation parameters of the dredged material will also be discussed.

  13. Summary of operations and performance of the Murdock site restoration project in 2007.

    LaFreniere, L. M.; Environmental Science Division

    2008-06-03

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the second full year of system operation, from January 1 through December 31, 2007. Performance in June 2005 through December 2006 was reported previously (Argonne 2007). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix A. A brief

  14. A Framework on Collaboration: an Interdisciplinary Project across Multiple Colleges

    Andis Kwan; Lin Leung; Xiangdong Li; Michael Anshel

    2007-01-01

    The order of complexity in carrying out collaborative research at multiple campuses poses a challenge to standard knowledge management systems. In this paper, we present a collaboration framework in which computer science students work in partnership with computer scientists, mathematicians and physicists on an emerging field of research, quantum information science. We first develop a few heuristic criteria to determine the rationale that makes project a successful one. We then demonstrate t...

  15. Phase I of the Kissimmee River restoration project, Florida, USA: impacts of construction on water quality.

    Colangelo, David J; Jones, Bradley L

    2005-03-01

    Phase I of the Kissimmee River restoration project included backfilling of 12 km of canal and restoring flow through 24 km of continuous river channel. We quantified the effects of construction activities on four water quality parameters (turbidity, total phosphorus flow-weighted concentration, total phosphorus load and dissolved oxygen concentration). Data were collected at stations upstream and downstream of the construction and at four stations within the construction zone to determine if canal backfilling and construction of 2.4 km of new river channel would negatively impact local and downstream water quality. Turbidity levels at the downstream station were elevated for approximately 2 weeks during the one and a half year construction period, but never exceeded the Florida Department of Environmental Protection construction permit criteria. Turbidity levels at stations within the construction zone were high at certain times. Flow-weighted concentration of total phosphorus at the downstream station was slightly higher than the upstream station during construction, but low discharge limited downstream transport of phosphorus. Total phosphorus loads at the upstream and downstream stations were similar and loading to Lake Okeechobee was not significantly affected by construction. Mean water column dissolved oxygen concentrations at all sampling stations were similar during construction.

  16. Technical Approach and Plan for Transitioning Spent Nuclear Fuel (SNF) Project Facilities to the Environmental Restoration Program

    SKELLY, W.A.

    1999-01-01

    This document describes the approach and process in which the 100-K Area Facilities are to be deactivated and transitioned over to the Environmental Restoration Program after spent nuclear fuel has been removed from the K Basins. It describes the Transition Project's scope and objectives, work breakdown structure, activity planning, estimated cost, and schedule. This report will be utilized as a planning document for project management and control and to communicate details of project content and integration

  17. Resource Constrained Planning of Multiple Projects with Separable Activities

    Fujii, Susumu; Morita, Hiroshi; Kanawa, Takuya

    In this study we consider a resource constrained planning problem of multiple projects with separable activities. This problem provides a plan to process the activities considering a resource availability with time window. We propose a solution algorithm based on the branch and bound method to obtain the optimal solution minimizing the completion time of all projects. We develop three methods for improvement of computational efficiency, that is, to obtain initial solution with minimum slack time rule, to estimate lower bound considering both time and resource constraints and to introduce an equivalence relation for bounding operation. The effectiveness of the proposed methods is demonstrated by numerical examples. Especially as the number of planning projects increases, the average computational time and the number of searched nodes are reduced.

  18. Strategic alliance for environmental restoration - results of the Chicago Pile 5 large scale demonstration project

    Aker, R.E.; Bradley, T.L.; Bhattacharyya, S.

    1998-01-01

    The world's largest environmental cleanup effort is focused upon the DOE weapons complex. These cleanup efforts parallel those which will be required as the commercial nuclear industry reaches the end of licensed life. The strategic Alliance for Environmental Restoration (Strategic Alliance), reflects the cooperative interest of industry, commercial nuclear utilities, university and national laboratory team members to bring a collaborative best-in-class approach to finding, and providing effective delivery of innovative environmental remediation technologies to the DOE Complex and subsequently to industry. The Strategic Alliance is comprised of team members from ComEd, Duke Engineering and Services, 3M, ICF Kaiser, Florida International University, and Argonne National Laboratory in concert with DOE. This team tested and evaluated over twenty innovative technologies in an effort to help provide cost effective technology solutions to DOE/Industry needs for decontamination and decommissioning. This paper summarizes the approach used by the Strategic Alliance and describes the results of this DOE funded project

  19. Environmental Restoration Program pollution prevention checklist guide for the feasibility study project phase

    1993-09-01

    Feasibility studies (FS) determine what remedial alternatives are presented to regulators for site cleanup. A key consideration in this process is the waste to be generated. Minimizing the volume and toxicity of this waste will ultimately contribute to the selection of the best remedial option. The purpose of this checklist guide is to assist the user in incorporating pollution prevention/waste minimization (PP/WM) in all FS phase projects of the Environmental Restoration (ER) Program. This guide will help users document PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to assist users with implementing and evaluating waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves and perform preliminary waste assessments

  20. Germination characteristics of Rhinanthus minor influence field emergence, competitiveness and potential use in restoration projects.

    Marin, M; Laverack, G; Matthews, S; Powell, A A

    2018-02-10

    The facultative root hemi-parasite Rhinanthus minor is often used in grassland habitat restoration projects to regulate ecosystem structure and function. Its impact on community productivity and diversity as a function of resource supply, sward composition and management has been widely investigated. However, there is a lack of information about the possible influence of seed quality on the efficacy of the hemi-parasite. Ten seed lots from commercial sources were sown in the field and their germination characteristics were investigated in the laboratory. Seeds from four lots were also germinated and sown in pots alongside plants of two host species, Lotus corniculatus and Holcus lanatus. Plant establishment, height and flowering density were evaluated for the hemi-parasite, while plant biomass was measured for both R. minor and its host. Two aspects of seed quality influenced the field emergence of seed lots of R. minor, the radicle emergence (%) and the length of the lag period from the beginning of imbibition to germination (mean germination time), which indicates seed vigour. A longer lag period (lower vigour) was associated with higher levels of seedling mortality and lower plant vigour, in terms of plant height and biomass accumulation and was also reflected in the parasitic impact of the seed lots. Seed quality, specifically germination and vigour, can influence the establishment, survival, subsequent plant productivity and parasitic impact of R. minor in vegetation restoration projects. Seed quality is discussed as a key factor to consider when predicting the impact of the hemi-parasite on community productivity and diversity. This article is protected by copyright. All rights reserved. This article is protected by copyright. All rights reserved.

  1. How public issues shape environmental restoration plans - experiences with Colorado UMTRA projects

    Hunt, B.; Monaghan, J.

    1991-01-01

    Federal environmental restoration plans are being significantly impacted by open-quotes grassrootsclose quotes public pressure and by community demands, some of which have little relation to the technical standards of remediation and which go well beyond authorizing legislation. These demands often represent significant additional project costs. A review of Uranium Mill Tailings Remedial Action (UMTRA) Program experiences in Colorado suggests that the more serious open-quotes grassrootsclose quotes issues associated with remediation rarely diminish and, in fact, will intensify over time. This presents program administrators with the dilemma of attempting to adhere to program mandates and keep projects within budget, while at the same time trying to be responsive to community concerns. Such high-profiled community debates have the ability to delay remediation and even jeopardize important projects. After prolonged public debate, when it becomes clear an issue will not dissipate, project officials may be forced to meet certain community demands. Often, this results in not only increased costs, but a loss of public confidence in clean-up efforts. Evidence also suggests, however, that when critical public issues can be identified and addressed before they become overly contentious, significant problems and controversy can be avoided; but, the situation is made difficult because project officials often lack the policy guidance to determine which, if any, community demands should be addressed and to what extent they should be met. The adoption of several key public policy principles by program administrators will provide a greater ability to address community demands in a timely and successful manner

  2. Multiple factors influence the vegetation composition of Southeast U.S. wetlands restored in the Wetlands Reserve Program

    Diane De Steven; Joel M. Gramling

    2013-01-01

    Degradation of wetlands on agricultural lands contributes to the loss of local or regional vegetation diversity. The U.S. Department of Agriculture’s Wetlands Reserve Program (WRP) funds the restoration of degraded wetlands on private ‘working lands’, but these WRP projects have not been studied in the Southeast United States. Wetland hydrogeomorphic type influences...

  3. RIGED-RA project - Restoration and management of Coastal Dunes in the Northern Adriatic Coast, Ravenna Area - Italy

    Giambastiani, Beatrice M. S.; Greggio, Nicolas; Sistilli, Flavia; Fabbri, Stefano; Scarelli, Frederico; Candiago, Sebastian; Anfossi, Giulia; Lipparini, Carlo A.; Cantelli, Luigi; Antonellini, Marco; Gabbianelli, Giovanni

    2016-10-01

    Coastal dunes play an important role in protecting the coastline. Unfortunately, in the last decades dunes have been removed or damaged by human activities. In the Emilia- Romagna region significant residual dune systems are found only along Ravenna and Ferrara coasts. In this context, the RIGED-RA projectRestoration and management of coastal dunes along the Ravenna coast” (2013-2016) has been launched with the aims to identify dynamics, erosion and vulnerability of Northern Adriatic coast and associated residual dunes, and to define intervention strategies for dune protection and restoration. The methodology is based on a multidisciplinary approach that integrates the expertise of several researchers and investigates all aspects (biotic and abiotic), which drive the dune-beach system. All datasets were integrated to identify test sites for applying dune restoration. The intervention finished in April 2016; evolution and restoration efficiency will be assessed.

  4. Image reconstruction from multiple fan-beam projections

    Jelinek, J.; Overton, T.R.

    1984-01-01

    Special-purpose third-generation fan-beam CT systems can be greatly simplified by limiting the number of detectors, but this requires a different mode of data collection to provide a set of projections appropriate to the required spatial resolution in the reconstructed image. Repeated rotation of the source-detector fan, combined with shift of the detector array and perhaps offset of the source with respect to the fan's axis after each 360 0 rotation(cycle), provides a fairly general pattern of projection space filling. The authors' investigated the problem of optimal data-collection geometry for a multiple-rotation fan-beam scanner and of corresponding reconstruction algorithm

  5. A Framework on Collaboration: an Interdisciplinary Project across Multiple Colleges

    Andis Kwan

    2007-06-01

    Full Text Available The order of complexity in carrying out collaborative research at multiple campuses poses a challenge to standard knowledge management systems. In this paper, we present a collaboration framework in which computer science students work in partnership with computer scientists, mathematicians and physicists on an emerging field of research, quantum information science. We first develop a few heuristic criteria to determine the rationale that makes project a successful one. We then demonstrate that our knowledge management systems produce publishable results and grant proposals within our framework.

  6. Natural resource risk and cost management in environmental restoration: Demonstration project at the Savannah River Site

    Bascietto, J.J.; Sharples, F.E.

    1995-01-01

    The US Department of Energy (DOE) is both a trustee for the natural resources present on its properties and the lead response agency under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As such, DOE is addressing the destruction or loss of those resources caused by releases of hazardous substances from its facilities (DOE 1991) and collecting data to be used in determining the extent of contamination at its facilities, estimating risks to human health and the environment, and selecting appropriate remedial actions. The remedial investigation/feasibility study (RI/FS) process is used to investigate sites and select remedial actions. A Natural Resource Damage Assessment (NRDA) process may be used to determine whether natural resources have also been injured by the released hazardous substances and to calculate compensatory monetary damages to be used to restore the natural resources. In FY 1994, the Savannah River Site (SRS) was chosen to serve as a demonstration site for testing the integrated NRDA framework and demonstrating how NRDA concerns might be integrated into the environmental restoration activities of an actual site that is characteristically large and complex. The demonstration project (1) provided a means to illustrate the use of complex analyses using real information on the specific natural resources of the SRS; (2) served as a vehicle for reinforcing and expanding the SRS staff's understanding of the links between the NRDA and RI/FS processes; (3) provided a forum for the discussion of strategic issues with SRS personnel; and (4) allowed the refining and elaboration of DOE guidance by benchmarking the theoretical process using real information and issues

  7. 78 FR 1246 - Otay River Estuary Restoration Project; South San Diego Bay Unit and Sweetwater Marsh Unit of the...

    2013-01-08

    ...-FF08RSDC00] Otay River Estuary Restoration Project; South San Diego Bay Unit and Sweetwater Marsh Unit of the... scoping with regard to the environmental impact statement (EIS) for the proposed Otay River Estuary... one of the following methods. Email: [email protected] . Please include ``Otay Estuary NOI'' in the...

  8. Gridded Surface Subsurface Hydrologic Analysis Modeling for Analysis of Flood Design Features at the Picayune Strand Restoration Project

    2016-08-01

    restore its predrainage hydrology and ecological function for beneficial effects on flora and fauna in the project area and surrounding public lands. The...partnership with South Florida Water Management District (SFWMD), is constructing these features. Engineering support is required for hydrologic and...simulation accuracy and related resource requirements. Spatial data products such as digital elevation models, surveyed channel cross sections, soil

  9. UF's Lone Cabbage Oyster Reef Restoration Project: a use case in implementing a data management plan (DMP)

    Aufmuth, Joe

    2018-01-01

    Data management plans are created to satisfy funding agency proposal requirements related to the data life cycle. Once an award is made researchers must implement the plan they described. But how is this best accomplished? The presentation UF’s Lone Cabbage Oyster Reef Restoration Project: a use case in implementing a data management plan (DMP) describes how PI's for this grant funded research project are achieving its data management plan goals using an academic library's consulting team.

  10. Conservation and restoration of indigenous plants to improve community livelihoods: the Useful Plants Project

    Ulian, Tiziana; Sacandé, Moctar; Mattana, Efisio

    2014-05-01

    Kew's Millennium Seed Bank partnership (MSBP) is one of the largest ex situ plant conservation initiatives, which is focused on saving plants in and from regions most at risk, particularly in drylands. Seeds are collected and stored in seed banks in the country of origin and duplicated in the Millennium Seed Bank in the UK. The MSBP also strengthens the capacity of local communities to successfully conserve and sustainably use indigenous plants, which are important for their wellbeing. Since 2007, high quality seed collections and research information have been gathered on ca. 700 useful indigenous plant species that were selected by communities in Botswana, Kenya, Mali, Mexico and South Africa through Project MGU - The Useful Plants Project. These communities range from various farmer's groups and organisations to traditional healers, organic cotton/crop producers and primary schools. The information on seed conservation and plant propagation was used to train communities and to propagate ca. 200 species that were then planted in local gardens, and as species reintroduced for reforestation programmes and enriching village forests. Experimental plots have also been established to further investigate the field performance (plant survival and growth rate) of indigenous species, using low cost procedures. In addition, the activities support revenue generation for local communities directly through the sustainable use of plant products or indirectly through wider environmental and cultural services. This project has confirmed the potential of biodiversity conservation to improve food security and human health, enhance community livelihoods and strengthen the resilience of land and people to the changing climate. This approach of using indigenous species and having local communities play a central role from the selection of species to their planting and establishment, supported by complementary research, may represent a model for other regions of the world, where

  11. In Situ Thermal NAPL Remediation at the Northeast Site Pinellas Environmental Restoration Project

    Juhlin, R.; Butherus, M.

    2006-01-01

    The U.S. Department of Energy (DOE) is conducting thermal remediation to remove non-aqueous phase liquids (NAPLs) from the subsurface at the Northeast Site that is part of the Pinellas Environmental Restoration Project. The Northeast Site is located on the Young - Rainey Science, Technology, and Research (STAR) Center in Largo, Florida. The STAR Center was formerly a DOE facility. The NAPL remediation was performed at Area A and is currently being performed at Area B at the Northeast Site. The remediation at Area A was completed in 2003 and covered an area of 900 m 2 (10,000 ft 2 ) and a depth of remediation that extended to 10.7 m (35 ft) below ground surface. Cleanup levels achieved were at or below maximum contaminant levels in almost all locations. The remediation project at Area B is ongoing and covers an area of 3,240 m 2 (36,000 ft 2 ), a volume of 41,300 m (54,000 yd 3), and a depth of remediation to 12 m (40 ft) below ground surface. In addition, a portion of the subsurface under an occupied building in Area B is included in the remediation. The cleanup levels achieved from this remediation will be available in the Area B Final Report that will be posted on the DOE Office of Legacy Management web site (www.lm.doe.gov/land/sites/fl/ pinellas/pinellas.htm) in January 2007. Electrical resistive heating and steam were the chosen remediation methods at both areas. Lessons learned from the Area A remediation were incorporated into the Area B remediation and could benefit managers of similar remediation projects. (authors)

  12. Healthcare for migrants, participatory health research and implementation science--better health policy and practice through inclusion. The RESTORE project.

    MacFarlane, Anne; O'Reilly-de Brún, Mary; de Brún, Tomas; Dowrick, Christopher; O'Donnell, Catherine; Mair, Frances; Spiegel, Wolfgang; van den Muijsenbergh, Maria; van Weel Baumgarten, Evelyn; Lionis, Christos; Clissmann, Ciaran

    2014-06-01

    This is a time of unprecedented mobility across the globe. Healthcare systems need to adapt to ensure that primary care is culturally and linguistically appropriate for migrants. Evidence-based guidelines and training interventions for cultural competence and the use of professional interpreters are available across European healthcare settings. However, in real-world practice migrants and their healthcare providers 'get by' with a range of informal and inadequate strategies. RESTORE is an EU FP7 funded project, which is designed to address this translational gap. The objective of RESTORE is to investigate and support the implementation of guidelines and training initiatives to support communication in cross-cultural consultations in selected European primary care settings. RESTORE is a qualitative, participatory health project running from 2011-2015. It uses a novel combination of normalization process theory and participatory learning and action research to follow and shape the implementation journeys of relevant guidelines and training initiatives. Research teams in Ireland, England, the Netherlands, Austria and Greece are conducting similar parallel qualitative case study fieldwork, with a complementary health policy analysis led by Scotland. In each setting, key stakeholders, including migrants, are involved in participatory data generation and analysis. RESTORE will provide knowledge about the levers and barriers to the implementation of guidelines and training initiatives in European healthcare settings and about successful, transferrable strategies to overcome identified barriers. RESTORE will elucidate the role of policy in shaping these implementation journeys; generate recommendations for European policy driving the development of culturally and linguistically appropriate healthcare systems.

  13. Case Study Application of the Biodiversity Security Index to Ranking Feasibility Studies for Ecosystem Restoration Projects of the U.S. Army Corps of Engineers

    2016-04-01

    ER D C/ EL C R- 16 -1 Ecosystem Management and Restoration Research Program Case Study Application of the Biodiversity Security Index... Biodiversity Security Index to Ranking Feasibility Studies for Ecosystem Restoration Projects of the U.S. Army Corps of Engineers Richard A. Cole... Biodiversity Security Index (BSI) was applied to 23 project sites ranked for restoration feasibility study annual funding by the U. S. Army Corps of

  14. Environmental Restoration Program pollution prevention checklist guide for the facility characterization project phase

    1993-09-01

    A facility characterization (FC) is conducted to determine the nature and extent contamination at a potential hazardous facility waste site. The information gathered during an FC includes (1) data on the volume and chemical nature of the waste, (2) information on the extent of contamination and the migration potential of the contaminants, (3) preliminary information on evaluation of alternative concepts that can or cannot be considered, and (4)supportive technical and cost data. For the purposes of identification, the following operational phases will be used for definition for this phase of the decommissioning and decontamination process (1) facility characterization before clean up, (2) characterization during clean up, (3) characterization of waste materials, and (4) site characterization after clean up. A key consideration in this process is the prevention of any waste to be generated from these characterization activities. The purpose of this checklist guide is to assist users with incorporating pollution prevention/waste minimization (PP/WM) in all FC phase projects of the Environmental Restoration (ER) Program. This guide will help users document PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to assist users with implementing and evaluating waste reduction

  15. Environmental Restoration Program pollution prevention checklist guide for the surveillance and maintenance project phase

    1993-09-01

    DOE Order 5820.2 mandates that a surveillance and maintenance program be established in all shut-down facilities to ensure adequate containment of contamination, provide physical safety and security, and reduce potential public and environmental hazards. A key consideration in this process is the prevention of any waste to be generated from these activities. The purpose of this checklist guide is to assist the user with incorporating pollution prevention/waste minimization (PP/WM) in all Surveillance and Maintenance (S ampersand M) phase projects of the Environmental Restoration (ER) Program. This guide will help users document their PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to assist users with implementing and evaluating waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves and perform preliminary waste assessments

  16. Environmental restoration program pollution prevention checklist guide for the evaluation of alternatives project phase

    1993-09-01

    Evaluation of alternative studies determine what decontamination and decommissioning (D ampersand D) alternatives are presented to regulators for facility and site cleanup. A key consideration in this process is the waste to be generated. Minimizing the volume and toxicity of this waste will ultimately contribute to the selection of the best clean-up option. The purpose of this checklist guide is to assist the user with incorporating pollution prevention/waste minimization (PP/WM) in all Evaluation of Alternatives (EV) phase projects of the Environmental Restoration (ER) Program. This guide will assist users with documenting PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to help users implement and evaluate waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves, eliminating expensive process waste assessments and audit teams

  17. Analysis of explosion-induced releases of toxic materials at an environmental restoration project

    Bloom, S.G.; Moon, W.H. Jr.

    1993-01-01

    Prior to 1988, a variety of materials were buried on the US DOE Oak Ridge Reservation. Records of the disposal operations are incomplete and toxic materials may have been placed adjacent to potential explosives. One of the safety concerns in conducting an environmental restoration project at the burial sites, is the possibility of an explosion which could release toxic materials to the atmosphere. A safety analysis examined the consequences of such releases by first postulating an upper bound for the strength of an explosive. A correlation, developed by Steindler and Seefeldt of Argonne National Laboratory, was then used to estimate the amount and particle-size distribution of the material that could become airborne from the explosion. The estimated amount of airborne material was the source term in an atmospheric dispersion model which was used to calculate infinite-time, concentration-time integrals and 5-minute, time- weighted average concentrations at locations down-wind from the explosion. The dispersion model includes particle deposition as a function of particle-size distribution class. The concentration-time integrals and average concentrations were compared to published guidelines to assess the consequences of an accidental explosion

  18. Trends and habitat associations of waterbirds using the South Bay Salt Pond Restoration Project, San Francisco Bay, California

    De La Cruz, Susan E. W.; Smith, Lacy M.; Moskal, Stacy M.; Strong, Cheryl; Krause, John; Wang, Yiwei; Takekawa, John Y.

    2018-04-02

    Executive SummaryThe aim of the South Bay Salt Pond Restoration Project (hereinafter “Project”) is to restore 50–90 percent of former salt evaporation ponds to tidal marsh in San Francisco Bay (SFB). However, hundreds of thousands of waterbirds use these ponds over winter and during fall and spring migration. To ensure that existing waterbird populations are supported while tidal marsh is restored in the Project area, managers plan to enhance the habitat suitability of ponds by adding islands and berms to change pond topography, manipulating water salinity and depth, and selecting appropriate ponds to maintain for birds. To help inform these actions, we used 13 years of monthly (October–April) bird abundance data from Project ponds to (1) assess trends in waterbird abundance since the inception of the Project, and (2) evaluate which pond habitat characteristics were associated with highest abundances of different avian guilds and species. For comparison, we also evaluated waterbird abundance trends in active salt production ponds using 10 years of monthly survey data.We assessed bird guild and species abundance trends through time, and created separate trend curves for Project and salt production ponds using data from every pond that was counted in a year. We divided abundance data into three seasons—fall (October–November), winter (December–February), and spring (March–April). We used the resulting curves to assess which periods had the highest bird abundance and to identify increasing or decreasing trends for each guild and species.

  19. Using Geomorphic Change Detection to Understand Restoration Project Success Relative to Stream Size

    Yeager, A.; Segura, C.

    2017-12-01

    Large wood (LW) jams have long been utilized as a stream restoration strategy to create fish habitat, with a strong focus on Coho salmon in the Pacific Northwest. These projects continue to be implemented despite limited understanding of their success in streams of different size. In this study, we assessed the changes triggered by LW introductions in 10 alluvial plane bed reaches with varying drainage areas (3.9-22 km²) and bankfull widths (6.4-14.7 m) in one Oregon Coast Range basin. In this basin, LW was added in an effort to improve winter rearing habitat for Coho salmon. We used detailed topographic mapping (0.5 m² resolution) to describe the local stream and floodplain geometry. Pebble counts were used to monitor changes in average substrate size after the LW addition. Field surveys were conducted immediately after the LW were installed, in the summer of 2016, and one year after installation, in the summer of 2017. We used geomorphic change detection analysis to quantify the amount of scour and deposition at each site along with changes in average bankfull width. Then we determined the relative amount of change among all sites to identify which size stream changed the most. We also modeled fluctuations in water surface elevation at each site, correlating frequency and inundation of the LW with geomorphic changes detected from the topographic surveys. Preliminary results show an increase in channel width and floodplain connectivity at all sites, indicating an increase in off-channel habitat for juvenile Coho salmon. Bankfull widths increased up to 75% in small sites and up to 25% in large sites. Median grain size became coarser in large streams (increased up to 20%), while we saw a similar amount of fining at smaller sites. The overall increase in channel width is compensated by an overall decrease in bed elevation at both large and small sites, suggesting the maintenance of overall geomorphic equilibrium. Further work will include quantifying these

  20. Screening for Phytophthora cinnamomi in reclaimed mined lands targeted for American chestnut restoration projects

    Shiv Hiremath; Kirsten Lehtoma; Annemarie Nagle; Pierluigi. Bonello

    2011-01-01

    We are working toward restoring the American chestnut in southeastern Ohio, which was once part of the tree's natural range. Some of these lands have been severely affected by excessive mining operations for several decades. Therefore, we are planning and testing use of ectomycorrhizal fungi in the restoration efforts. Mycorrhizal fungi may play a vital role in...

  1. 75 FR 52360 - Upper Truckee River Restoration and Golf Course Reconfiguration Project, El Dorado County, CA

    2010-08-25

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Upper Truckee River Restoration and Golf Course... and comment the draft EIR/EIS for the Upper Truckee River Restoration and Golf Course Reconfiguration... include continuing existing golf course use, removal of the entire Lake Tahoe Golf Course, or...

  2. A review of theoretical frameworks applicable for designing agricultural watershed restoration projects

    Agricultural watershed restoration is the process of assisting the recovery of ecosystem structure and/or function within watersheds that have been degraded and damaged by agriculture. Unfortunately, agricultural watershed restoration is the rare exception within the Midwestern United States despit...

  3. Restoring Eelgrass (Zostera marina) from Seed: A Comparison of Planting Methods for Large-Scale Projects

    Orth, Robert; Marion, Scott; Granger, Steven; Traber, Michael

    2008-01-01

    Eelgrass (Zostera marina) seeds are being used in a variety of both small- and large-scale restoration activities and have been successfully used to initiate recovery of eelgrass in the Virginia seaside coastal lagoons...

  4. NOAA's Coastal Protection and Restoration Division: Watershed Database and Mapping Projects

    National Oceanic and Atmospheric Administration, Department of Commerce — Protection and restoration of coastal watersheds requires the synthesis of complex environmental issues. Contaminated site remediation, dredging and disposal of...

  5. Sound Waste Management Plan environmental operations, and used oil management system: Restoration project 97115. Exxon Valdez oil spill restoration project final report: Volumes 1 and 2

    NONE

    1998-06-01

    This project constitutes Phase 2 of the Sound Waste Management Plan and created waste oil collection and disposal facilities, bilge water collection and disposal facilities, recycling storage, and household hazardous waste collection and storage, and household hazardous waste collection and storage facilities in Prince William Sound. A wide range of waste streams are generated within communities in the Sound including used oil generated from vehicles and vessels, and hazardous wastes generated by households. This project included the design and construction of Environmental Operations Stations buildings in Valdez, Cordova, Whittier, Chenega Bay and Tatitlek to improve the overall management of oily wastes. They will house new equipment to facilitate oily waste collection, treatment and disposal. This project also included completion of used oil management manuals.

  6. Sound Waste Management Plan environmental operations, and used oil management system: Restoration project 97115. Exxon Valdez oil spill restoration project final report: Volumes 1 and 2

    1998-06-01

    This project constitutes Phase 2 of the Sound Waste Management Plan and created waste oil collection and disposal facilities, bilge water collection and disposal facilities, recycling storage, and household hazardous waste collection and storage, and household hazardous waste collection and storage facilities in Prince William Sound. A wide range of waste streams are generated within communities in the Sound including used oil generated from vehicles and vessels, and hazardous wastes generated by households. This project included the design and construction of Environmental Operations Stations buildings in Valdez, Cordova, Whittier, Chenega Bay and Tatitlek to improve the overall management of oily wastes. They will house new equipment to facilitate oily waste collection, treatment and disposal. This project also included completion of used oil management manuals

  7. Assessment Approach for Identifying Compatibility of Restoration Projects with Geomorphic and Flooding Processes in Gravel Bed Rivers.

    DeVries, Paul; Aldrich, Robert

    2015-08-01

    A critical requirement for a successful river restoration project in a dynamic gravel bed river is that it be compatible with natural hydraulic and sediment transport processes operating at the reach scale. The potential for failure is greater at locations where the influence of natural processes is inconsistent with intended project function and performance. We present an approach using practical GIS, hydrologic, hydraulic, and sediment transport analyses to identify locations where specific restoration project types have the greatest likelihood of working as intended because their function and design are matched with flooding and morphologic processes. The key premise is to identify whether a specific river analysis segment (length ~1-10 bankfull widths) within a longer reach is geomorphically active or inactive in the context of vertical and lateral stabilities, and hydrologically active for floodplain connectivity. Analyses involve empirical channel geometry relations, aerial photographic time series, LiDAR data, HEC-RAS hydraulic modeling, and a time-integrated sediment transport budget to evaluate trapping efficiency within each segment. The analysis segments are defined by HEC-RAS model cross sections. The results have been used effectively to identify feasible projects in a variety of alluvial gravel bed river reaches with lengths between 11 and 80 km and 2-year flood magnitudes between ~350 and 1330 m(3)/s. Projects constructed based on the results have all performed as planned. In addition, the results provide key criteria for formulating erosion and flood management plans.

  8. Assessment Approach for Identifying Compatibility of Restoration Projects with Geomorphic and Flooding Processes in Gravel Bed Rivers

    DeVries, Paul; Aldrich, Robert

    2015-08-01

    A critical requirement for a successful river restoration project in a dynamic gravel bed river is that it be compatible with natural hydraulic and sediment transport processes operating at the reach scale. The potential for failure is greater at locations where the influence of natural processes is inconsistent with intended project function and performance. We present an approach using practical GIS, hydrologic, hydraulic, and sediment transport analyses to identify locations where specific restoration project types have the greatest likelihood of working as intended because their function and design are matched with flooding and morphologic processes. The key premise is to identify whether a specific river analysis segment (length ~1-10 bankfull widths) within a longer reach is geomorphically active or inactive in the context of vertical and lateral stabilities, and hydrologically active for floodplain connectivity. Analyses involve empirical channel geometry relations, aerial photographic time series, LiDAR data, HEC-RAS hydraulic modeling, and a time-integrated sediment transport budget to evaluate trapping efficiency within each segment. The analysis segments are defined by HEC-RAS model cross sections. The results have been used effectively to identify feasible projects in a variety of alluvial gravel bed river reaches with lengths between 11 and 80 km and 2-year flood magnitudes between ~350 and 1330 m3/s. Projects constructed based on the results have all performed as planned. In addition, the results provide key criteria for formulating erosion and flood management plans.

  9. The STRATEGY project: decision tools to aid sustainable restoration and long-term management of contaminated agricultural ecosystems.

    Howard, B J; Beresford, N A; Nisbet, A; Cox, G; Oughton, D H; Hunt, J; Alvarez, B; Andersson, K G; Liland, A; Voigt, G

    2005-01-01

    The STRATEGY project (Sustainable Restoration and Long-Term Management of Contaminated Rural, Urban and Industrial Ecosystems) aimed to provide a holistic decision framework for the selection of optimal restoration strategies for the long-term sustainable management of contaminated areas in Western Europe. A critical evaluation was carried out of countermeasures and waste disposal options, from which compendia of state-of-the-art restoration methods were compiled. A decision support system capable of optimising spatially varying restoration strategies, that considered the level of averted dose, costs (including those of waste disposal) and environmental side effects was developed. Appropriate methods of estimating indirect costs associated with side effects and of communicating with stakeholders were identified. The importance of stakeholder consultation at a local level and of ensuring that any response is site and scenario specific were emphasised. A value matrix approach was suggested as a method of addressing social and ethical issues within the decision-making process, and was designed to be compatible with both the countermeasure compendia and the decision support system. The applicability and usefulness of STRATEGY outputs for food production systems in the medium to long term is assessed.

  10. The STRATEGY project: decision tools to aid sustainable restoration and long-term management of contaminated agricultural ecosystems

    Howard, B.J.; Beresford, N.A.; Nisbet, A.; Cox, G.; Oughton, D.H.; Hunt, J.; Alvarez, B.; Andersson, K.G.; Liland, A.; Voigt, G.

    2005-01-01

    The STRATEGY project (Sustainable Restoration and Long-Term Management of Contaminated Rural, Urban and Industrial Ecosystems) aimed to provide a holistic decision framework for the selection of optimal restoration strategies for the long-term sustainable management of contaminated areas in Western Europe. A critical evaluation was carried out of countermeasures and waste disposal options, from which compendia of state-of-the-art restoration methods were compiled. A decision support system capable of optimising spatially varying restoration strategies, that considered the level of averted dose, costs (including those of waste disposal) and environmental side effects was developed. Appropriate methods of estimating indirect costs associated with side effects and of communicating with stakeholders were identified. The importance of stakeholder consultation at a local level and of ensuring that any response is site and scenario specific were emphasised. A value matrix approach was suggested as a method of addressing social and ethical issues within the decision-making process, and was designed to be compatible with both the countermeasure compendia and the decision support system. The applicability and usefulness of STRATEGY outputs for food production systems in the medium to long term is assessed

  11. Implementation of Multiple Intelligences Supported Project-Based Learning in EFL/ESL Classrooms

    Bas, Gokhan

    2008-01-01

    This article deals with the implementation of Multiple Intelligences supported Project-Based learning in EFL/ESL Classrooms. In this study, after Multiple Intelligences supported Project-based learning was presented shortly, the implementation of this learning method into English classrooms. Implementation process of MI supported Project-based…

  12. New Design for Rapid Prototyping of Digital Master Casts for Multiple Dental Implant Restorations.

    Romero, Luis; Jiménez, Mariano; Espinosa, María Del Mar; Domínguez, Manuel

    2015-01-01

    This study proposes the replacement of all the physical devices used in the manufacturing of conventional prostheses through the use of digital tools, such as 3D scanners, CAD design software, 3D implants files, rapid prototyping machines or reverse engineering software, in order to develop laboratory work models from which to finish coatings for dental prostheses. Different types of dental prosthetic structures are used, which were adjusted by a non-rotatory threaded fixing system. From a digital process, the relative positions of dental implants, soft tissue and adjacent teeth of edentulous or partially edentulous patients has been captured, and a maser working model which accurately replicates data relating to the patients oral cavity has been through treatment of three-dimensional digital data. Compared with the conventional master cast, the results show a significant cost savings in attachments, as well as an increase in the quality of reproduction and accuracy of the master cast, with the consequent reduction in the number of patient consultation visits. The combination of software and hardware three-dimensional tools allows the optimization of the planning of dental implant-supported rehabilitations protocol, improving the predictability of clinical treatments and the production cost savings of master casts for restorations upon implants.

  13. Perfect blind restoration of images blurred by multiple filters: theory and efficient algorithms.

    Harikumar, G; Bresler, Y

    1999-01-01

    We address the problem of restoring an image from its noisy convolutions with two or more unknown finite impulse response (FIR) filters. We develop theoretical results about the existence and uniqueness of solutions, and show that under some generically true assumptions, both the filters and the image can be determined exactly in the absence of noise, and stably estimated in its presence. We present efficient algorithms to estimate the blur functions and their sizes. These algorithms are of two types, subspace-based and likelihood-based, and are extensions of techniques proposed for the solution of the multichannel blind deconvolution problem in one dimension. We present memory and computation-efficient techniques to handle the very large matrices arising in the two-dimensional (2-D) case. Once the blur functions are determined, they are used in a multichannel deconvolution step to reconstruct the unknown image. The theoretical and practical implications of edge effects, and "weakly exciting" images are examined. Finally, the algorithms are demonstrated on synthetic and real data.

  14. New Design for Rapid Prototyping of Digital Master Casts for Multiple Dental Implant Restorations.

    Luis Romero

    Full Text Available This study proposes the replacement of all the physical devices used in the manufacturing of conventional prostheses through the use of digital tools, such as 3D scanners, CAD design software, 3D implants files, rapid prototyping machines or reverse engineering software, in order to develop laboratory work models from which to finish coatings for dental prostheses. Different types of dental prosthetic structures are used, which were adjusted by a non-rotatory threaded fixing system.From a digital process, the relative positions of dental implants, soft tissue and adjacent teeth of edentulous or partially edentulous patients has been captured, and a maser working model which accurately replicates data relating to the patients oral cavity has been through treatment of three-dimensional digital data.Compared with the conventional master cast, the results show a significant cost savings in attachments, as well as an increase in the quality of reproduction and accuracy of the master cast, with the consequent reduction in the number of patient consultation visits. The combination of software and hardware three-dimensional tools allows the optimization of the planning of dental implant-supported rehabilitations protocol, improving the predictability of clinical treatments and the production cost savings of master casts for restorations upon implants.

  15. New Design for Rapid Prototyping of Digital Master Casts for Multiple Dental Implant Restorations

    Romero, Luis; Jiménez, Mariano; Espinosa, María del Mar; Domínguez, Manuel

    2015-01-01

    Aim This study proposes the replacement of all the physical devices used in the manufacturing of conventional prostheses through the use of digital tools, such as 3D scanners, CAD design software, 3D implants files, rapid prototyping machines or reverse engineering software, in order to develop laboratory work models from which to finish coatings for dental prostheses. Different types of dental prosthetic structures are used, which were adjusted by a non-rotatory threaded fixing system. Method From a digital process, the relative positions of dental implants, soft tissue and adjacent teeth of edentulous or partially edentulous patients has been captured, and a maser working model which accurately replicates data relating to the patients oral cavity has been through treatment of three-dimensional digital data. Results Compared with the conventional master cast, the results show a significant cost savings in attachments, as well as an increase in the quality of reproduction and accuracy of the master cast, with the consequent reduction in the number of patient consultation visits. The combination of software and hardware three-dimensional tools allows the optimization of the planning of dental implant-supported rehabilitations protocol, improving the predictability of clinical treatments and the production cost savings of master casts for restorations upon implants. PMID:26696528

  16. 10 years after the largest river restoration project in Northern Europe

    Astrup Kristensen, Esben Astrup; Kronvang, B.; Wiberg-Larsen, P.

    2014-01-01

    that erosion and sedimentation have changed the cross-sectional profiles over the last 10 years, resulting in a net input of sediment to the lower reaches of the river. However, the change of channel form was a slow process and predicted bank retreat over a 100 year period was only up to 6.8 m. Hence......The lower river Skjern (Denmark) historically contained a large variation in habitats and the river ran through large areas with wetlands, many backwaters, islands and oxbow lakes. During the 1960s the river was channelized and the wetland drained. A restoration during 2001–2002 transformed 19 km...... of channelized river into 26 km meandering river. The short-term effects of this restoration have previously been reported and for this study we revisited the river and with new data evaluated the long-term (10 years) hydrological effects of the restoration. The evaluation was done on three different scales: (1...

  17. Governance and management dynamics of landscape restoration at multiple scales: Learning from successful environmental managers in Sweden.

    Dawson, Lucas; Elbakidze, Marine; Angelstam, Per; Gordon, Johanna

    2017-07-15

    Due to a long history of intensive land and water use, habitat networks for biodiversity conservation are generally degraded in Sweden. Landscape restoration (LR) is an important strategy for achieving representative and functional green infrastructures. However, outcomes of LR efforts are poorly studied, particularly the dynamics of LR governance and management. We apply systems thinking methods to a series of LR case studies to analyse the causal structures underlying LR governance and management in Sweden. We show that these structures appear to comprise of an interlinked system of at least three sets of drivers and four core processes. This system exhibits many characteristics of a transformative change towards an integrated, adaptive approach to governance and management. Key challenges for Swedish LR projects relate to institutional and regulatory flexibility, the timely availability of sufficient funds, and the management of learning and knowledge production processes. In response, successful project leaders develop several key strategies to manage complexity and risk, and enhance perceptions of the attractiveness of LR projects. Copyright © 2017 Elsevier Ltd. All rights reserved.

  18. Assessing the value of the Central Everglades Planning Project (CEPP) in Everglades restoration: an ecosystem service approach

    Richardson, Leslie A.; Keefe, Kelly; Huber, Christopher C.; Racevskis, Laila; Gregg, Reynolds; Thourot, Scott; Miller, Ian

    2014-01-01

    This study identifies a full range of ecosystem services that could be affected by a restoration project in the central Everglades and monetizes the economic value of a subset of these services using existing data. Findings suggest that the project will potentially increase many ecosystem services that have considerable economic value to society. The ecosystem services monetized within the scope of this study are a subset of the difference between the future-with the Central Everglades Planning Project (CEPP) and the future-without CEPP, and they totaled ~ $1.8 billion USD at a 2.5% discount rate. Findings suggest that the use of ecosystem services in project planning and communications may require acknowledgment of the difficulty of monetizing important services and the limitations associated with using only existing data and models. Results of this study highlight the need for additional valuation efforts in this region, focused on those services that are likely to be impacted by restoration activities but were notably challenging to value in this assessment due to shortages of data.

  19. Site Restoration

    Noynaert, L.; Bruggeman, A.; Cornelissen, R.; Massaut, V.; Rahier, A

    2001-04-01

    The objectives, the programme, and the achievements of the Site Restoration Department of SCK-CEN in 2000 are summarised. Main activities include the decommissioning of the BR3 PWR-reactor as well as other clean-up activities, projects on waste minimisation and activities related to the management of decommissioning projects. The department provides consultancy and services to external organisations.

  20. Site Restoration

    Noynaert, L.; Bruggeman, A.; Cornelissen, R.; Massaut, V.; Rahier, A.

    2001-01-01

    The objectives, the programme, and the achievements of the Site Restoration Department of SCK-CEN in 2000 are summarised. Main activities include the decommissioning of the BR3 PWR-reactor as well as other clean-up activities, projects on waste minimisation and activities related to the management of decommissioning projects. The department provides consultancy and services to external organisations

  1. Joint Coordinating Committee on environmental restoration and waste management (JCCEM) support, technology transfer, and special projects

    Edgar, D.E.

    1993-01-01

    Argonne National Laboratory (ANL) assisted in identifying and evaluating foreign technologies to meet EM needs; supported the evaluation, removal, and/or revision of barriers to international technology and information transfer/exchange; facilitated the integration and coordination of U.S. government international environmental restoration and waste management activities; and enhanced U.S. industry's competitiveness in the international environmental technology market

  2. 77 FR 21721 - Sierra National Forest, Bass Lake Ranger District, California, Whisky Ecosystem Restoration Project

    2012-04-11

    ... and vigor of conifer stands, reduce the spread and intensity of wildfires within and outside of the Wildland Urban Interface (WUI) and restore other ecological processes. DATES: Comments concerning the scope... on these federal and formerly private lands, combined with the exclusion of fire, have altered forest...

  3. Manager Perspectives on Communication and Public Engagement in Ecological Restoration Project Success

    We argue that public engagement is crucial to achieving lasting ecological success in aquatic restoration efforts, and that the most effective public engagement mechanisms are what we term iterative mechanisms. Here we look to a particular social-ecological system – the restorati...

  4. Assessing the Performance of In-Stream Restoration Projects Using Radio Frequency Identification (RFID Transponders

    Bruce MacVicar

    2015-10-01

    Full Text Available Instream channel restoration is a common practice in river engineering that presents a challenge for research. One research gap is the development of monitoring techniques that allow for testable predictions of sediment transport and supply. Here we use Radio Frequency Identification (RFID transponders to compare the short-term (1-year sediment transport response to flood events in a restored and a control reach. The field site is Wilket Creek, an enlarged creek in a fully urbanized catchment without stormwater management control in Toronto, Ontario. The responses to three flooding periods, each of which are at or above the design bankfull discharge, are described. Key results are that (i particle mobility is lower in the restored reach for all three periods; (ii full mobility occurs in the control reach during the first two floods while partial mobility occurs in the restored reach; and (iii the constructed morphology exerted a controlling influence on particle entrainment, with higher mobility in the pools. Log-transformed travel distances exhibit normal distributions when grouped by particle size class, which allows a statistical comparison with power law and other predictive travel-distance relations. Results show that three bedload transport conditions can occur, with partial mobility associated with a mild relation between particle size and travel distance and full mobility associated with either a flat or steep relation depending on the degree of integration of particles in the bed. Recommendations on seeding strategy and sample sizes are made to improve the precision of the results by minimizing confidence intervals for mobility and travel distances. Even in a short term study, the RFID sediment tracking technique allows a process-based assessment of stream restoration outcomes that can be used to justify the instream intervention and plan future attempts to stabilize and enhance the system.

  5. Information needs for habitat protection: Marbled murrelet habitat identification. Restoration project 93051b. Exxon Valdez oil spill restoration project final report

    Kuletz, K.J.; Marks, D.K.; Naslund, N.L.; Goodson, N.G.; Cody, M.B.

    1994-12-01

    To define murrelet nesting habitat in southcentral Alaska, we surveyed inland activity of murrelets and measured habitat features between 1991 and 1993, in Prince William Sound, Kenai Fjords National Park and Afognak Island, Alaska (N=262 sites). Using all study areas, we developed statistical models that explain variation in murrelet activity levels and predict the occurrence of behaviors indicative of nesting, based on temporal, geographic, topographic, weather and habitat variables. The multiple regression analyses explained 52 percent of the variation in murrelet activity level. Stepwise logistic regression was used to identify variables that could predict the occurrence of nesting behaviors. The best model included survey method (from a boat, shore or inland), location relative to the head of a bay, tree diameter and number of potential nesting platforms on trees. Overall, the features indicative of murrelet nesting habitat included low elevation locations near the heads of bays, with extensive forest cover of large old-growth trees.

  6. Tank farm restoration and safe operation, Project W-314, upgrade scope summary report (USSR)

    Gilbert, J.L.

    1998-01-01

    The revision to the Project W-314 Upgrade Scope Summary Report (USSR), incorporates changes to the project scope from customer guidance. Included are incorporation of the recommendations from HNF-2500, agreements regarding interfaces with Project W-211, and assumption of scope previously assigned to Project W-454

  7. The critical role of islands for waterbird breeding and foraging habitat in managed ponds of the South Bay Salt Pond Restoration Project, South San Francisco Bay, California

    Ackerman, Joshua T.; Hartman, C. Alex; Herzog, Mark P.; Smith, Lacy M.; Moskal, Stacy M.; De La Cruz, Susan E. W.; Yee, Julie L.; Takekawa, John Y.

    2014-01-01

    The South Bay Salt Pond Restoration Project aims to restore 50–90 percent of former salt evaporation ponds into tidal marsh in South San Francisco Bay, California. However, large numbers of waterbirds use these ponds annually as nesting and foraging habitat. Islands within ponds are particularly important habitat for nesting, foraging, and roosting waterbirds. To maintain current waterbird populations, the South Bay Salt Pond Restoration Project plans to create new islands within former salt ponds in South San Francisco Bay. In a series of studies, we investigated pond and individual island attributes that are most beneficial to nesting, foraging, and roosting waterbirds.

  8. Project management plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory. Environmental Restoration Program

    1995-01-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place nineteen former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S ampersand M) and as quickly and economically as possible. Implementation and completion of the deactivation project win further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S ampersand M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project

  9. TU-CD-BRA-12: Coupling PET Image Restoration and Segmentation Using Variational Method with Multiple Regularizations

    Li, L; Tan, S [Huazhong University of Science and Technology, Wuhan, Hubei (China); Lu, W [University of Maryland School of Medicine, Baltimore, MD (United States)

    2015-06-15

    Purpose: To propose a new variational method which couples image restoration with tumor segmentation for PET images using multiple regularizations. Methods: Partial volume effect (PVE) is a major degrading factor impacting tumor segmentation accuracy in PET imaging. The existing segmentation methods usually need to take prior calibrations to compensate PVE and they are highly system-dependent. Taking into account that image restoration and segmentation can promote each other and they are tightly coupled, we proposed a variational method to solve the two problems together. Our method integrated total variation (TV) semi-blind deconvolution and Mumford-Shah (MS) segmentation. The TV norm was used on edges to protect the edge information, and the L{sub 2} norm was used to avoid staircase effect in the no-edge area. The blur kernel was constrained to the Gaussian model parameterized by its variance and we assumed that the variances in the X-Y and Z directions are different. The energy functional was iteratively optimized by an alternate minimization algorithm. Segmentation performance was tested on eleven patients with non-Hodgkin’s lymphoma, and evaluated by Dice similarity index (DSI) and classification error (CE). For comparison, seven other widely used methods were also tested and evaluated. Results: The combination of TV and L{sub 2} regularizations effectively improved the segmentation accuracy. The average DSI increased by around 0.1 than using either the TV or the L{sub 2} norm. The proposed method was obviously superior to other tested methods. It has an average DSI and CE of 0.80 and 0.41, while the FCM method — the second best one — has only an average DSI and CE of 0.66 and 0.64. Conclusion: Coupling image restoration and segmentation can handle PVE and thus improves tumor segmentation accuracy in PET. Alternate use of TV and L2 regularizations can further improve the performance of the algorithm. This work was supported in part by National Natural

  10. Complete restoration of multiple dystrophin isoforms in genetically corrected Duchenne muscular dystrophy patient–derived cardiomyocytes

    Susi Zatti

    2014-01-01

    Full Text Available Duchenne muscular dystrophy (DMD–associated cardiac diseases are emerging as a major cause of morbidity and mortality in DMD patients, and many therapies for treatment of skeletal muscle failed to improve cardiac function. The reprogramming of patients' somatic cells into pluripotent stem cells, combined with technologies for correcting the genetic defect, possesses great potential for the development of new treatments for genetic diseases. In this study, we obtained human cardiomyocytes from DMD patient–derived, induced pluripotent stem cells genetically corrected with a human artificial chromosome carrying the whole dystrophin genomic sequence. Stimulation by cytokines was combined with cell culturing on hydrogel with physiological stiffness, allowing an adhesion-dependent maturation and a proper dystrophin expression. The obtained cardiomyocytes showed remarkable sarcomeric organization of cardiac troponin T and α-actinin, expressed cardiac-specific markers, and displayed electrically induced calcium transients lasting less than 1 second. We demonstrated that the human artificial chromosome carrying the whole dystrophin genomic sequence is stably maintained throughout the cardiac differentiation process and that multiple promoters of the dystrophin gene are properly activated, driving expression of different isoforms. These dystrophic cardiomyocytes can be a valuable source for in vitro modeling of DMD-associated cardiac disease. Furthermore, the derivation of genetically corrected, patient-specific cardiomyocytes represents a step toward the development of innovative cell and gene therapy approaches for DMD.

  11. Review of Invasive Riparian Trees that Impact USACE Ecosystem Restoration Projects

    2016-08-01

    often release seeds in periods of stress , including periods when exposed to herbicides or mechanical disturbances. Such characteristics make this...Approved for public release ; distribution is unlimited. ERDC TN-EMRRP-SI-36 August 2016 Review of Invasive Riparian Trees that Impact USACE...various spatial control methods for woody invasive plant removal in densely vegetated riparian habitats. The USACE ecosystem restoration mission has

  12. Environmental restoration contractor facility safety plan -- MO-561 100-D site remediation project

    Donahoe, R.L.

    1996-11-01

    This safety plan is applicable to Environmental Restoration Contractor personnel who are permanently assigned to MO-561 or regularly work in the facility. The MO-561 Facility is located in the 100-D Area at the Hanford Site in Richland, Washington. This plan will: (a) identify hazards potentially to be encountered by occupants of MO-561; (b) provide requirements and safeguards to ensure personnel safety and regulatory compliance; (c) provide information and actions necessary for proper emergency response

  13. Design review report: AN valve pit upgrades for Project W-314, tank farm restoration and safe operations

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's AN Valve Pit Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314, Tank Farm Restoration and Safe Operations, is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farms' waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first package to be performed is the AN Valve Pit Upgrades package. The scope of the modifications includes new pit cover blocks, valve manifolds, leak detectors, transfer line connections (for future planned transfer lines), and special protective coating for the 241-AN-A and 241-AN-B valve pits

  14. Contrasting the roles of section length and instream habitat enhancement for river restoration success: a field study on 20 European restoration projects

    Hering, D.; Aroviita, J.; Baattrup-Pedersen, A.; Brabec, K.; Buijse, T.; Ecke, F.; Friberg, N.; Gielczewski, Marek; Januschke, K.; Köhler, J.; Kupilas, Benjamin; Lorenz, A.W.; Muhar, S.; Paillex, Amael; Poppe, Michaela; Schmidt, T.; Schmutz, S.; Vermaat, J.; Verdonschot, R.C.M.; Verdonschot, P.F.M.; Wolter, Christian; Kail, J.

    2015-01-01

    1. Restoration of river hydromorphology often has limited detected effects on river biota. One frequently discussed reason is that the restored river length is insufficient to allow populations to develop and give the room for geomorphologic processes to occur. 2. We investigated ten pairs of

  15. Projected Impacts of Climate, Urbanization, Water Management, and Wetland Restoration on Waterbird Habitat in California's Central Valley.

    Elliott L Matchett

    Full Text Available The Central Valley of California is one of the most important regions for wintering waterbirds in North America despite extensive anthropogenic landscape modification and decline of historical wetlands there. Like many other mediterranean-climate ecosystems across the globe, the Central Valley has been subject to a burgeoning human population and expansion and intensification of agricultural and urban development that have impacted wildlife habitats. Future effects of urban development, changes in water supply management, and precipitation and air temperature related to global climate change on area of waterbird habitat in the Central Valley are uncertain, yet potentially substantial. Therefore, we modeled area of waterbird habitats for 17 climate, urbanization, water supply management, and wetland restoration scenarios for years 2006-2099 using a water resources and scenario modeling framework. Planned wetland restoration largely compensated for adverse effects of climate, urbanization, and water supply management changes on habitat areas through 2065, but fell short thereafter for all except one scenario. Projected habitat reductions due to climate models were more frequent and greater than under the recent historical climate and their magnitude increased through time. After 2065, area of waterbird habitat in all scenarios that included severe warmer, drier climate was projected to be >15% less than in the "existing" landscape most years. The greatest reduction in waterbird habitat occurred in scenarios that combined warmer, drier climate and plausible water supply management options affecting priority and delivery of water available for waterbird habitats. This scenario modeling addresses the complexity and uncertainties in the Central Valley landscape, use and management of related water supplies, and climate to inform waterbird habitat conservation and other resource management planning. Results indicate that increased wetland restoration

  16. Projected Impacts of Climate, Urbanization, Water Management, and Wetland Restoration on Waterbird Habitat in California's Central Valley.

    Matchett, Elliott L; Fleskes, Joseph P

    2017-01-01

    The Central Valley of California is one of the most important regions for wintering waterbirds in North America despite extensive anthropogenic landscape modification and decline of historical wetlands there. Like many other mediterranean-climate ecosystems across the globe, the Central Valley has been subject to a burgeoning human population and expansion and intensification of agricultural and urban development that have impacted wildlife habitats. Future effects of urban development, changes in water supply management, and precipitation and air temperature related to global climate change on area of waterbird habitat in the Central Valley are uncertain, yet potentially substantial. Therefore, we modeled area of waterbird habitats for 17 climate, urbanization, water supply management, and wetland restoration scenarios for years 2006-2099 using a water resources and scenario modeling framework. Planned wetland restoration largely compensated for adverse effects of climate, urbanization, and water supply management changes on habitat areas through 2065, but fell short thereafter for all except one scenario. Projected habitat reductions due to climate models were more frequent and greater than under the recent historical climate and their magnitude increased through time. After 2065, area of waterbird habitat in all scenarios that included severe warmer, drier climate was projected to be >15% less than in the "existing" landscape most years. The greatest reduction in waterbird habitat occurred in scenarios that combined warmer, drier climate and plausible water supply management options affecting priority and delivery of water available for waterbird habitats. This scenario modeling addresses the complexity and uncertainties in the Central Valley landscape, use and management of related water supplies, and climate to inform waterbird habitat conservation and other resource management planning. Results indicate that increased wetland restoration and additional

  17. Projected impacts of climate, urbanization, water management, and wetland restoration on waterbird habitat in California’s Central Valley

    Matchett, Elliott L.; Fleskes, Joseph

    2017-01-01

    The Central Valley of California is one of the most important regions for wintering waterbirds in North America despite extensive anthropogenic landscape modification and decline of historical wetlands there. Like many other mediterranean-climate ecosystems across the globe, the Central Valley has been subject to a burgeoning human population and expansion and intensification of agricultural and urban development that have impacted wildlife habitats. Future effects of urban development, changes in water supply management, and precipitation and air temperature related to global climate change on area of waterbird habitat in the Central Valley are uncertain, yet potentially substantial. Therefore, we modeled area of waterbird habitats for 17 climate, urbanization, water supply management, and wetland restoration scenarios for years 2006–2099 using a water resources and scenario modeling framework. Planned wetland restoration largely compensated for adverse effects of climate, urbanization, and water supply management changes on habitat areas through 2065, but fell short thereafter for all except one scenario. Projected habitat reductions due to climate models were more frequent and greater than under the recent historical climate and their magnitude increased through time. After 2065, area of waterbird habitat in all scenarios that included severe warmer, drier climate was projected to be >15% less than in the “existing” landscape most years. The greatest reduction in waterbird habitat occurred in scenarios that combined warmer, drier climate and plausible water supply management options affecting priority and delivery of water available for waterbird habitats. This scenario modeling addresses the complexity and uncertainties in the Central Valley landscape, use and management of related water supplies, and climate to inform waterbird habitat conservation and other resource management planning. Results indicate that increased wetland restoration and additional

  18. Effect of severe hurricanes on biorock coral reef restoration projects in Grand Turk, Turks and Caicos Islands.

    Wells, Lucy; Perez, Fernando; Hibbert, Marlon; Clerveaux, Luc; Johnson, Jodi; Goreau, Thomas J

    2010-10-01

    Artificial reefs are often discouraged in shallow waters over concerns of storm damage to structures and surrounding habitat. Biorock coral reef restoration projects were initiated in waters around 5 m deep in Grand Turk, at Oasis (October 2006) and at Governor's Beach (November 2007). Hemi-cylindrical steel modules, 6m long were used, four modules at Oasis and six at Governor's Beach. Each project has over 1200 corals transplanted from sites with high sedimentation damage, and are regularly monitored for coral growth, mortality and fish populations. Corals show immediate growth over wires used to attach corals. Growth has been measured from photographs using a software program and is faster at Governor's Beach. After hurricanes Hanna and Ike (September 2008) the Governor's Beach structure was fully standing since the waves passed straight through with little damage, the Oasis structures which were tie-wired rather than welded had one module collapse (since been replaced with a new, welded structure). Hurricane Ike was the strongest hurricane on record to hit Grand Turk. Most cables were replaced following the hurricanes due to damage from debris and high wave action. The projects lost about a third of the corals due to hurricanes. Most of those lost had only been wired a few days before and had not yet attached themselves firmly. These projects have regenerated corals and fish populations in areas of barren sand or bedrock and are now attractive to snorkelers. High coral survival and low structural damage after hurricanes indicate that Biorock reef restoration can be effective in storm-impacted areas.

  19. Effect of severe hurricanes on Biorock Coral Reef Restoration Projects in Grand Turk, Turks and Caicos Islands

    Lucy Wells

    2010-10-01

    Full Text Available Artificial reefs are often discouraged in shallow waters over concerns of storm damage to structures and surrounding habitat. Biorock coral reef restoration projects were initiated in waters around 5m deep in Grand Turk, at Oasis (October 2006 and at Governor’s Beach (November 2007. Hemi-cylindrical steel modules, 6m long were used, four modules at Oasis and six at Governor’s Beach. Each project has over 1200 corals transplanted from sites with high sedimentation damage, and are regularly monitored for coral growth, mortality and fish populations. Corals show immediate growth over wires used to attach corals. Growth has been measured from photographs using a software program and is faster at Governor’s Beach. After hurricanes Hanna and Ike (September 2008 the Governor’s Beach structure was fully standing since the waves passed straight through with little damage, the Oasis structures which were tie-wired rather than welded had one module collapse (since been replaced with a new, welded structure. Hurricane Ike was the strongest hurricane on record to hit Grand Turk. Most cables were replaced following the hurricanes due to damage from debris and high wave action. The projects lost about a third of the corals due to hurricanes. Most of those lost had only been wired a few days before and had not yet attached themselves firmly. These projects have regenerated corals and fish populations in areas of barren sand or bedrock and are now attractive to snorkelers. High coral survival and low structural damage after hurricanes indicate that Biorock reef restoration can be effective in storm-impacted areas. Rev. Biol. Trop. 58 (Suppl. 3: 141-149. Epub 2010 October 01.

  20. WE-AB-207A-02: John’s Equation Based Consistency Condition and Incomplete Projection Restoration Upon Circular Orbit CBCT

    Ma, J; Qi, H; Wu, S; Xu, Y; Zhou, L; Yan, H

    2016-01-01

    Purpose: In transmitted X-ray tomography imaging, projections are sometimes incomplete due to a variety of reasons, such as geometry inaccuracy, defective detector cells, etc. To address this issue, we have derived a direct consistency condition based on John’s Equation, and proposed a method to effectively restore incomplete projections based on this consistency condition. Methods: Through parameter substitutions, we have derived a direct consistency condition equation from John’s equation, in which the left side is only projection derivative of view and the right side is projection derivative of other geometrical parameters. Based on this consistency condition, a projection restoration method is proposed, which includes five steps: 1) Forward projecting reconstructed image and using linear interpolation to estimate the incomplete projections as the initial result; 2) Performing Fourier transform on the projections; 3) Restoring the incomplete frequency data using the consistency condition equation; 4) Performing inverse Fourier transform; 5) Repeat step 2)∼4) until our criteria is met to terminate the iteration. Results: A beam-blocking-based scatter correction case and a bad-pixel correction case were used to demonstrate the efficacy and robustness of our restoration method. The mean absolute error (MAE), signal noise ratio (SNR) and mean square error (MSE) were employed as our evaluation metrics of the reconstructed images. For the scatter correction case, the MAE is reduced from 63.3% to 71.7% with 4 iterations. Compared with the existing Patch’s method, the MAE of our method is further reduced by 8.72%. For the bad-pixel case, the SNR of the reconstructed image by our method is increased from 13.49% to 21.48%, with the MSE being decreased by 45.95%, compared with linear interpolation method. Conclusion: Our studies have demonstrated that our restoration method based on the new consistency condition could effectively restore the incomplete projections

  1. Flexibility and Project Value: Interactions and Multiple Real Options

    Čulík, Miroslav

    2010-06-01

    This paper is focused on a project valuation with embedded portfolio of real options including their interactions. Valuation is based on the criterion of Net Present Value on the simulation basis. Portfolio includes selected types of European-type real options: option to expand, contract, abandon and temporarily shut down and restart a project. Due to the fact, that in reality most of the managerial flexibility takes the form of portfolio of real options, selected types of options are valued not only individually, but also in combination. The paper is structured as follows: first, diffusion models for forecasting of output prices and variable costs are derived. Second, project value is estimated on the assumption, that no real options are present. Next, project value is calculated with the presence of selected European-type options; these options and their impact on project value are valued first in isolation and consequently in different combinations. Moreover, intrinsic value evolution of given real options with respect to the time of exercising is analysed. In the end, results are presented graphically; selected statistics and risk measures (Value at Risk, Expected Shortfall) of the NPV's distributions are calculated and commented.

  2. The anthropogenic nature of present-day low energy rivers in western France and implications for current restoration projects

    Lespez, L.; Viel, V.; Rollet, A. J.; Delahaye, D.

    2015-12-01

    As in other European countries, western France has seen an increase in river restoration projects. In this paper, we examine the restoration goals, methods and objectives with respect to the long-term trajectory and understanding of the contemporary dynamics of the small low energy rivers typical of the lowlands of Western Europe. The exhaustive geomorphological, paleoenvironmental and historical research conducted in the Seulles river basin (Normandy) provides very accurate documentation of the nature and place of the different legacies in the fluvial systems we have inherited. The sedimentation rate in the Seulles valley bottom has multiplied by a factor of 20 since the end of the Bronze Age and has generated dramatic changes in fluvial forms. Hydraulic control of the rivers and valley bottoms drainage throughout the last millennium has channelized rivers within these deposits. The single meandering channel which characterizes this river today is the legacy of the delayed and complex effects of long term exploitation of the river basin and the fluvial system. Bring to light that the "naturalness" of the restored rivers might be questioned. Our research emphasizes the gap between the poor knowledge of the functioning of these rivers and the concrete objectives of the restoration works undertaken, including dam and weir removal. Account of the long-term history of fluvial systems is required, not only to produce a pedagogic history of the "river degradation" but more fundamentally (i) to situate the current functioning of the fluvial system in a trajectory to try to identify thresholds and anticipate the potential turning points in a context of climate and land use change, (ii) to understand the role of morphosedimentary legacies on the current dynamics, (iii) to open the discussion on reference functioning or expected states and (iv) to open discussion on the sustainability of ecological restoration. To conclude, we point out the necessity to take into account the

  3. Large-scale dam removal in the northeast United States: documenting ecological responses to the Penobscot River Restoration Project

    Collins, M. J.; Aponte Clarke, G.; Baeder, C.; McCaw, D.; Royte, J.; Saunders, R.; Sheehan, T.

    2012-12-01

    The Penobscot River Restoration Project aims to improve aquatic connectivity in New England's second largest watershed ( 22,000 km2) by removing the two lowermost, mainstem dams and bypassing a third dam on a principal tributary upstream. Project objectives include: restoring unobstructed access to the entire historic riverine range for five lower river diadromous species including Atlantic and shortnose sturgeon; significantly improving access to upstream habitat for six upper river diadromous species including Atlantic salmon; reconnecting trophic linkages between headwater areas and the Gulf of Maine; restoring fluvial processes to the former impoundments; improving recreational and Penobscot Nation cultural opportunities; and maintaining basin-wide hydropower output. The project is expected to have landscape-scale benefits and the need for a significant investment in long-term monitoring and evaluation to formally quantify ecosystem response has been recognized. A diverse group of federal, state, tribal, NGO, and academic partners has developed a long-term monitoring and evaluation program composed of nine studies that began in 2009. Including American Recovery and Reinvestment Act (ARRA) funding that leveraged partner contributions, we have invested nearly $2M to date in pre- and post-removal investigations that evaluate geomorphology/bed sediment, water quality, wetlands, and fisheries. Given the number of affected diadromous species and the diversity of their life histories, we have initiated six distinct, but related, fisheries investigations to document these expected changes: Atlantic salmon upstream and downstream passage efficiency using passive integrated transponder (PIT) and acoustic telemetry; fish community structure via an index of biotic integrity (IBI); total diadromous fish biomass through hydroacoustics; shortnose sturgeon spawning and habitat use via active and passive acoustic telemetry; and freshwater-marine food web interactions by

  4. Tank farm restoration and safe operation, project W-314, upgrade scope summary report (USSR)

    Jacobson, R.W.

    1997-01-01

    This revision to the Project W-314 Upgrade Scope Summary Report (USSR), incorporates changes to the project scope from Alternative Generation Analysis (AGA), customer guidance, and changing requirements. It defines the actual upgrades currently in scope, and provides traceability to the requirements and/or drivers

  5. Risk Management Plan for Tank Farm Restoration and Safe Operations, Project W-314

    MCGREW, D.L.

    2000-01-01

    The Risk Management Plan for Project W-314 describes the systems, processes and procedures for implementation of applicable risk management practices described in HNF-0842, Volume IV, Section 2.6, ''Risk Management''. This plan is tailored specifically for use by Project W-314

  6. Systems Engineering Management Plan for Tank Farm Restoration and Safety Operations, Project W-314

    MCGREW, D.L.

    2000-01-01

    The Systems Engineering Management Plan for Project W-314 has been prepared within the guidelines of HNF-SD-WM-SEMP-002, TWRS Systems Engineering Management Plan. The activities within this SEMP have been tailored, in accordance with the TWRS SEMP and DOE Order 430.1, Life Cycle Asset Management, to meet the needs of the project

  7. Multiple Disabilities and Visual Impairment: An Action Research Project

    Argyropoulos, Vassilios; Thymakis, Paraskevas

    2014-01-01

    Children with visual and motor disabilities constitute a distinct group with a unique set of educational needs. Such children are often grouped with the broader population of children with multiple disabilities and visual impairments (that is, those who are blind or have low vision) (Erin, 2000; McLinden, 1997). The chief characteristic of…

  8. Multiple levels in the organisation of innovation : project organization in single-firm projects and multi-firm projects

    Jaspers, F.P.H.; Ende, van den J.C.M.; Borgh, van der W.; Yin, Jie

    2008-01-01

    Studies about how the organization of new product (and new service) development projects (NPD) projects influences project performance typically investigate this in Single-firm projects, i.e. projects with high ownership integration. However, NPD projects are often performed by two or more

  9. Do large scale restoration projects reduce within-species traits variability? - Présentées à 2 congrès

    Harzé, Mélanie; Monty, Arnaud; Mahy, Grégory

    2015-01-01

    Dry calcareous grasslands represent local biodiversity hotspots of European temperate regions. They have suffered intensive fragmentations due to due to the abandonment of traditional agropastoral systems and the resulting encroachment, reforestation, urbanization or transformation into arable lands. In order to preserve and enhance their ecological value, a series of ecological restoration projects have been implemented throughout Europe (LIFE+). As habitats restoration costs can be prohibit...

  10. Hydrological information products for the Off-Project Water Program of the Klamath Basin Restoration Agreement

    Snyder, Daniel T.; Risley, John C.; Haynes, Jonathan V.

    2012-01-01

    The Klamath Basin Restoration Agreement (KBRA) was developed by a diverse group of stakeholders, Federal and State resource management agencies, Tribal representatives, and interest groups to provide a comprehensive solution to ecological and water-supply issues in the Klamath Basin. The Off-Project Water Program (OPWP), one component of the KBRA, has as one of its purposes to permanently provide an additional 30,000 acre-feet of water per year on an average annual basis to Upper Klamath Lake through "voluntary retirement of water rights or water uses or other means as agreed to by the Klamath Tribes, to improve fisheries habitat and also provide for stability of irrigation water deliveries." The geographic area where the water rights could be retired encompasses approximately 1,900 square miles. The OPWP area is defined as including the Sprague River drainage, the Sycan River drainage downstream of Sycan Marsh, the Wood River drainage, and the Williamson River drainage from Kirk Reef at the southern end of Klamath Marsh downstream to the confluence with the Sprague River. Extensive, broad, flat, poorly drained uplands, valleys, and wetlands characterize much of the study area. Irrigation is almost entirely used for pasture. To assist parties involved with decisionmaking and implementation of the OPWP, the U.S. Geological Survey (USGS), in cooperation with the Klamath Tribes and other stakeholders, created five hydrological information products. These products include GIS digital maps and datasets containing spatial information on evapotranspiration, subirrigation indicators, water rights, subbasin streamflow statistics, and return-flow indicators. The evapotranspiration (ET) datasets were created under contract for this study by Evapotranspiration, Plus, LLC, of Twin Falls, Idaho. A high-resolution remote sensing technique known as Mapping Evapotranspiration at High Resolution and Internalized Calibration (METRIC) was used to create estimates of the spatial

  11. Planning for environmental restoration of uranium mining and milling sites in Central and Eastern Europe. Proceedings of a workshop held under the technical co-operation project RER/9/022 on environmental restoration in Central and Eastern Europe

    1997-11-01

    An IAEA Regional Technical Co-operation (TC) project RER/9/022 on ''Environmental Restoration'' for central and eastern Europe and the former USSR was launched in 1992 and concluded at the end of 1996. The first phase of this project had the primary purpose of identifying and characterizing radioactively contaminated sites in the region, including evaluation of doses to the general public and other environmental impacts. The main result of this phase of the project were published in IAEA-TECDOC-865. A new 1995-1996 phase of the project focused on the radioactive contamination of uranium mining and milling sites and the development of plans for environmental restoration of these sites. While the 1993-1994 phase aimed at attracting the attention of Member States in the region to a long neglected problem, the second phase served as a stimulus to initiate concrete planning activities that would lead to corrective actions in highly contaminated areas in those countries. As a consequence, the project emphasis shifted from scientific discussions to the identification of responsibilities, planning activities, and the assessment of existing and required resources for the eventual implementation of restoration plans. The 1995-1996 phase of the project consisted of a planning meeting and three workshops that addressed different topical themes. The papers compiled in this publication were presented at the last workshop, held in Felix, Romania, 4-8 November 1996. They summarize national situations in environmental contamination as of the end of 1996 and ongoing or planned actions for remediation

  12. Quantifying the Carbon Balance of Forest Restoration and Wildfire under Projected Climate in the Fire-Prone Southwestern US.

    Hurteau, Matthew D

    2017-01-01

    Climate projections for the southwestern US suggest a warmer, drier future and have the potential to impact forest carbon (C) sequestration and post-fire C recovery. Restoring forest structure and surface fire regimes initially decreases total ecosystem carbon (TEC), but can stabilize the remaining C by moderating wildfire behavior. Previous research has demonstrated that fire maintained forests can store more C over time than fire suppressed forests in the presence of wildfire. However, because the climate future is uncertain, I sought to determine the efficacy of forest management to moderate fire behavior and its effect on forest C dynamics under current and projected climate. I used the LANDIS-II model to simulate carbon dynamics under early (2010-2019), mid (2050-2059), and late (2090-2099) century climate projections for a ponderosa pine (Pinus ponderosa) dominated landscape in northern Arizona. I ran 100-year simulations with two different treatments (control, thin and burn) and a 1 in 50 chance of wildfire occurring. I found that control TEC had a consistent decline throughout the simulation period, regardless of climate. Thin and burn TEC increased following treatment implementation and showed more differentiation than the control in response to climate, with late-century climate having the lowest TEC. Treatment efficacy, as measured by mean fire severity, was not impacted by climate. Fire effects were evident in the cumulative net ecosystem exchange (NEE) for the different treatments. Over the simulation period, 32.8-48.9% of the control landscape was either C neutral or a C source to the atmosphere and greater than 90% of the thin and burn landscape was a moderate C sink. These results suggest that in southwestern ponderosa pine, restoring forest structure and surface fire regimes provides a reasonable hedge against the uncertainty of future climate change for maintaining the forest C sink.

  13. Quantifying the Carbon Balance of Forest Restoration and Wildfire under Projected Climate in the Fire-Prone Southwestern US.

    Matthew D Hurteau

    Full Text Available Climate projections for the southwestern US suggest a warmer, drier future and have the potential to impact forest carbon (C sequestration and post-fire C recovery. Restoring forest structure and surface fire regimes initially decreases total ecosystem carbon (TEC, but can stabilize the remaining C by moderating wildfire behavior. Previous research has demonstrated that fire maintained forests can store more C over time than fire suppressed forests in the presence of wildfire. However, because the climate future is uncertain, I sought to determine the efficacy of forest management to moderate fire behavior and its effect on forest C dynamics under current and projected climate. I used the LANDIS-II model to simulate carbon dynamics under early (2010-2019, mid (2050-2059, and late (2090-2099 century climate projections for a ponderosa pine (Pinus ponderosa dominated landscape in northern Arizona. I ran 100-year simulations with two different treatments (control, thin and burn and a 1 in 50 chance of wildfire occurring. I found that control TEC had a consistent decline throughout the simulation period, regardless of climate. Thin and burn TEC increased following treatment implementation and showed more differentiation than the control in response to climate, with late-century climate having the lowest TEC. Treatment efficacy, as measured by mean fire severity, was not impacted by climate. Fire effects were evident in the cumulative net ecosystem exchange (NEE for the different treatments. Over the simulation period, 32.8-48.9% of the control landscape was either C neutral or a C source to the atmosphere and greater than 90% of the thin and burn landscape was a moderate C sink. These results suggest that in southwestern ponderosa pine, restoring forest structure and surface fire regimes provides a reasonable hedge against the uncertainty of future climate change for maintaining the forest C sink.

  14. Project chariot remediation - the use of DOE's observational approach for environmental restoration with elements of the new DOE safer approach

    Hopkins, A.; Stewart, C.; Cabble, K.

    1994-01-01

    The primary purpose of Project Chariot was to investigate the technical problems and assess the effect of the proposed harbor excavation using nuclear explosives in Alaska. However, no nuclear devices were brought to the Project Chariot site. Between 1959 and 1961 various environmental tests were conducted. During the course of these environmental studies, the U.S. Geological Survey (USGS) granted the use of up to 5 curies of radioactive material at the Chariot site in Cape Thompson, Alaska; however only 26 millicuries were ever actually used. The tests were conducted in 12 test plots which were later gathered together and were mixed with in situ-soils generating approximately 1,600 cubic feet of soil. This area was then covered with four feet of clean soil, creating a mound. In 1962, the site was abandoned. A researcher at the University of Alaska at Fairbanks obtained in formation regarding the tests conducted and the materials left at the Project Chariot site. In response to concerns raised through the publication of this information, it was decided by the Department of Energy (DOE) that total remediation of the mound be completed within the year. During the summer of 1993, IT Corporation carried out the assessment and remediation of the Project Chariot site using a streamlined approach to waste site decision making called the Observational Approach (OA), and added elements of the new DOE Streamlined Approach for Environmental Restoration (SAFER). This remediation and remediation approach is described

  15. STN-stimulation in Parkinson's disease restores striatal inhibition of thalamocortical projection

    Geday, Jacob; Østergaard, Karen; Johnsen, Erik

    2009-01-01

    To test the hypothesis that deep brain stimulation of the subthalamic nucleus (STN) restores the inhibitory output to the striatothalamocortical loop in Parkinson's disease, we obtained functional brain images of blood flow in 10 STN-stimulated patients with Parkinson's disease. Patients were...... in the STN and in the left nucleus lentiformis. Conversely, flow declined in the left supplementary motor area (BA 6), ventrolateral nucleus of the left thalamus, and right cerebellum. Activation of the basal ganglia and deactivation of supplementary motor area and thalamus were both correlated...... with the improvement of motor function. The result is consistent with the explanation that stimulation in resting patients raises output from the STN with activation of the inhibitory basal ganglia output nuclei and subsequent deactivation of the thalamic anteroventral and ventrolateral nuclei and the supplementary...

  16. Environmental Assessment: Multiple Projects at Laughlin Air Force Base, Texas

    2006-05-17

    Publico sobre el La Evaluation de lmpacto Ambiental de MUltiples Proyectos en Ia Base de Ia Fuerza Aerea Laughlin De acuerdo con el Acta Nacional de 1...which emphasizes frequencies in the middle of the audible spectrum and de -emphasizes low and high frequencies in a manner corresponding to the way the...feet from the source. Assuming that noise from the heavy equipment radiates equally in all directions, the sound intensity diminishes inversely as the

  17. Restoration of areas disturbed by site studies for a mined commercial radioactive waste repository: The Basalt Waste Isolation Project [BWIP

    Brandt, C.A.; Rickard, W.H. Jr.; Biehert, R.W.; Newell, R.L.; Page, T.L.

    1989-01-01

    The Basalt Waste Isolation Project (BWIP) was undertaken to environmentally characterize a portion of the US Department of Energy's Hanford Site in Washington State as a potential host for the nation's first mined commercial nuclear waste repository. Studies were terminated by Congress in 1987. Between 1976 and 1987, 72 areas located across the Hanford Site were disturbed by the BWIP. These areas include borehole pads, a large Exploratory Shaft Facility, and the Near Surface Test Facility. Most boreholes were cleared of vegetation, leveled, and stabilized with a thick layer of compacted pit-run gravel and sand. The Near Surface Test Facility consists of three mined adits, a rock-spoils bench, and numerous support facilities. Restoration began in 1988 with the objective of returning sites to pre-existing conditions using native species. The Hanford Site retains some of the last remnants of the shrub-steppe ecosystem in Washington. The primary constraints to restoring native vegetation at Hanford are low precipitation and the presence of cheatgrass, an extremely capable alien competitor. 5 figs

  18. Design review report: 200 East upgrades for Project W-314, tank farm restoration and safe operations

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's 200 East (200E) Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314 is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farm waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first design package (AN Valve Pit Upgrades) was completed in November 1997, and the associated design verification activities are documented in HNF-1893. The second design package, 200 East (200E) Upgrades, was completed in March 1998. This design package identifies modifications to existing valve pits 241-AX-B and 241-A-B, as well as several new waste transfer pipelines to be constructed within the A Farm Complex of the 200E Area. The scope of the valve pit modifications includes new pit cover blocks, valve

  19. Restoration of degraded arid farmland at Project Wadi Attir: Impact of conservation on biological productivity and soil organic matter

    Mor-Mussery, Amir; Helman, David; Ben Eli, Michael; Leu, Stefan

    2017-04-01

    The Israeli Negev Desert, as most Mediterranean drylands, is profoundly degraded. We have been documenting degradation and successful rehabilitation approaches in recent research, aiming at maximizing environmental and economic benefits while restoring healthy dryland soils and perennial vegetation to act as carbon sinks. These methods have been implemented for rehabilitation of Project Wadi Attir's. 50 hectares of heavily degraded farmland suffering from intensive soil erosion (expressed in dense gullies net and massive overland flow). Project Wadi Attir is a groundbreaking initiative of the Bedouin community in the Negev, for establishing a model sustainable agricultural operation. The project was initiated by the US-based Sustainability Laboratory and the Hura Municipal Council. The project is designed to demonstrate implementation of holistic sustainability principles developed by The Lab. The project's ecosystem restoration component involves site development, erosion control, soil conservation and improvement, planting of native and agroforestry trees, together with conservation and protection of biodiversity hotspots and avoiding grazing have, within three years, revealed the high biodiversity and productivity potential of this arid/semi-arid landscape. A number of shrublands and loess plots were subject to strict conservation, avoiding tilling and grazing. Soil fertility, productivity and biodiversity of these conserved plots inside the farm boundaries was compared to similar unprotected plots outside the farm fences by sampling in the field and by using satellite imaging. Our findings indicate a gradual improvement of SOM content specifically in the conserved shrubland area. Water infiltration, herbaceous biomass productivity and ants' activity of the protected plots also significantly increased within 3 years compared to the unprotected control areas. Starting from similar soil organic matter content in 2013 (3.3%) in the rocky slopes, in 2016 1% higher

  20. Environmental Restoration of Diesel-Range Organics from Project Chariot, Cape Thompson, Alaska

    Kautsky, Mark [U.S. Department of Energy, Office of Legacy Management; Hutton, Rick [Navarro Research & Engineering; Miller, Judy [Navarro Research & Engineering

    2016-03-06

    The Chariot site is located in the Ogotoruk Valley in the Cape Thompson region of northwest Alaska. Project Chariot was part of the Plowshare Program, created in 1957 by the US Atomic Energy Commission (AEC), a predecessor agency of the US Department of Energy (DOE), to study peaceful uses for atomic energy. Project Chariot began in 1958 when a scientific field team chose Cape Thompson as a potential site to excavate a harbor using a series of nuclear explosions. AEC, with assistance from other agencies, conducted more than 40 pretest bioenvironmental studies of the Cape Thompson area between 1959 and 1962; however, the Plowshare Program work at the Project Chariot site (Figure 1) was cancelled because of strong public opposition [1]. No nuclear explosions were ever conducted at the site.

  1. Beyond Restoration. Valorization of the Public. Monumental Heritage Asset The Istituto degli Innocenti and the MUDI Project

    Carlo Terpolilli

    2012-04-01

    Full Text Available While protection of our collective monumental heritage is a value and an objective we pass along to future generations, at the same time it must be conceived of a commitment to making these assets available to citizens of the present time. This means applying the disciplines of preservation and restoration and at the same time going beyond with a cultural approach that interprets the monumental asset as a fabbrica; that is, as a place of ongoing design activity: a workshop for a work in progress. This approach necessitates programs for valorization and productive investments that operate in full respect of the assets themselves while employing the innovative tools available for ensuring that the asset as a whole produces income. This is the framework for the MUDI project in Florence.

  2. Palm Vein Verification Using Multiple Features and Locality Preserving Projections

    Ali Mohsin Al-juboori

    2014-01-01

    Full Text Available Biometrics is defined as identifying people by their physiological characteristic, such as iris pattern, fingerprint, and face, or by some aspects of their behavior, such as voice, signature, and gesture. Considerable attention has been drawn on these issues during the last several decades. And many biometric systems for commercial applications have been successfully developed. Recently, the vein pattern biometric becomes increasingly attractive for its uniqueness, stability, and noninvasiveness. A vein pattern is the physical distribution structure of the blood vessels underneath a person’s skin. The palm vein pattern is very ganglion and it shows a huge number of vessels. The attitude of the palm vein vessels stays in the same location for the whole life and its pattern is definitely unique. In our work, the matching filter method is proposed for the palm vein image enhancement. New palm vein features extraction methods, global feature extracted based on wavelet coefficients and locality preserving projections (WLPP, and local feature based on local binary pattern variance and locality preserving projections (LBPV_LPP have been proposed. Finally, the nearest neighbour matching method has been proposed that verified the test palm vein images. The experimental result shows that the EER to the proposed method is 0.1378%.

  3. FME Senior Project Managers: A Juggling Act of Multiple Projects | Poster

    By Peggy Pearl, Contributing Writer It was not until the 1950s that organizations in the United States began to apply project management tools and techniques to complex construction and engineering projects (http://en.m.wikipedia.org/wiki/Project_life_cycle).

  4. Disclosing the diagnosis of multiple sclerosis: the Profile Project.

    Martinelli, Vittorio; Ghezzi, A; Montanari, E; Radaelli, M; Comi, G; Bossa, R

    2012-12-01

    Communicating the diagnosis of multiple sclerosis (MS) is a challenging task, often undertaken with discomfort by most neurologists. Only a few studies have investigated patients' satisfaction with timing and way of receiving the diagnosis, but surveys regarding physicians' attitude towards diagnosis disclosure are even more limited. The goal of this work was to highlight Italian neurologists' behavioral and emotional approach to MS patients, making them sensitive to their difficulties and to the importance of an empathic relationship. The majority of Italian neurologists participating in our study have a good perception of their ability to manage this difficult communicating process and believe in the great effect this moment may have on a life-long disease experience. Improving communication skills may help the therapeutic alliance, enhancing patients' acceptance of the disease, as well as motivation and adherence to treatment.

  5. 78 FR 26319 - Deepwater Horizon Oil Spill; Proposal of Future Early Restoration Projects and Environmental Reviews

    2013-05-06

    ... selected and implemented in accordance with the Oil Pollution Act of 1990 (OPA), the Framework Agreement... oil spill under the Oil Pollution Act 1990 (OPA; 33 U.S.C. 2701 et seq.). Pursuant to OPA, federal and... cost of this project is approximately $3.5 million. Sea Rim State Park Amenities (Jefferson County...

  6. Restoring the Power Projection Capabilities of the U.S. Armed Forces

    2017-02-16

    stealthy UAVs; swarms of small, expendable UAVs; and robotic sensors on the surface. The idea is to spread sensors across a number of different...powered exoskeleton , also known as the Talon Project • Develop swarming and autonomous unmanned vehicles a David Ochmanek, Peter A. Wilson, Brenna

  7. 77 FR 21722 - Gore Creek Restoration Project; Intent To Prepare an Environmental Impact Statement

    2012-04-11

    ... District Ranger, P.O. Box 7, Yampa, Colorado 80483 or email comments to comments-rocky-mountain-medicine... causing adverse impacts to stream networks within the project boundary. Proposed Action The Yampa Ranger..., road decommissioning, new road construction, and dispersed campsite decommissioning along streams...

  8. Supporting Multiple Programs and Projects at NASA's Kennedy Space Center

    Stewart, Camiren L.

    2014-01-01

    With the conclusion of the shuttle program in 2011, the National Aeronautics and Space Administration (NASA) had found itself at a crossroads for finding transportation of United States astronauts and experiments to space. The agency would eventually hand off the taxiing of American astronauts to the International Space Station (ISS) that orbits in Low Earth Orbit (LEO) about 210 miles above the earth under the requirements of the Commercial Crew Program (CCP). By privatizing the round trip journey from Earth to the ISS, the space agency has been given the additional time to focus funding and resources to projects that operate beyond LEO; however, adding even more stress to the agency, the premature cancellation of the program that would succeed the Shuttle Program - The Constellation Program (CxP) -it would inevitably delay the goal to travel beyond LEO for a number of years. Enter the Space Launch System (SLS) and the Orion Multipurpose Crew Vehicle (MPCV). Currently, the SLS is under development at NASA's Marshall Spaceflight Center in Huntsville, Alabama, while the Orion Capsule, built by government contractor Lockheed Martin Corporation, has been assembled and is currently under testing at the Kennedy Space Center (KSC) in Florida. In its current vision, SLS will take Orion and its crew to an asteroid that had been captured in an earlier mission in lunar orbit. Additionally, this vehicle and its configuration is NASA's transportation to Mars. Engineers at the Kennedy Space Center are currently working to test the ground systems that will facilitate the launch of Orion and the SLS within its Ground Services Development and Operations (GSDO) Program. Firing Room 1 in the Launch Control Center (LCC) has been refurbished and outfitted to support the SLS Program. In addition, the Spaceport Command and Control System (SCCS) is the underlying control system for monitoring and launching manned launch vehicles. As NASA finds itself at a junction, so does all of its

  9. Enhanced invertebrate prey production following estuarine restoration supports foraging for multiple species of juvenile salmonids (Oncorhynchus spp.)

    Woo, Isa; Davis, Melanie; Ellings, Christopher S.; Nakai, Glynnis; Takekawa, John Y.; De La Cruz, Susan

    2018-01-01

    Estuaries provide crucial foraging resources and nursery habitat for threatened populations of anadromous salmon. As such, there has been a global undertaking to restore habitat and tidal processes in modified estuaries. The foraging capacity of these ecosystems to support various species of out-migrating juvenile salmon can be quantified by monitoring benthic, terrestrial, and pelagic invertebrate prey communities. Here, we present notable trends in the availability of invertebrate prey at several sites within a restoring large river delta in Puget Sound, Washington, U.S.A. Three years after the system was returned to tidal influence, we observed substantial additions to amphipod, copepod, and cumacean abundances in newly accessible marsh channels (from 0 to roughly 5,000–75,000 individuals/m2). In the restoration area, terrestrial invertebrate colonization was dependent upon vegetative cover, with dipteran and hymenopteran biomass increasing 3-fold between 1 and 3 years post-restoration. While the overall biodiversity within the restoration area was lower than in the reference marsh, estimated biomass was comparable to or greater than that found within the other study sites. This additional prey biomass likely provided foraging benefits for juvenile Chinook, chum, and coho salmon. Primary physical drivers differed for benthic, terrestrial, and pelagic invertebrates, and these invertebrate communities are expected to respond differentially depending on organic matter exchange and vegetative colonization. Restoring estuaries may take decades to meet certain success criteria, but our study demonstrates rapid enhancements in foraging resources understood to be used for estuary-dependent wildlife.

  10. Joint part-of-speech and dependency projection from multiple sources

    Johannsen, Anders Trærup; Agic, Zeljko; Søgaard, Anders

    2016-01-01

    for multiple tasks from multiple source languages, relying on parallel corpora available for hundreds of languages. When training POS taggers and dependency parsers on jointly projected POS tags and syntactic dependencies using our algorithm, we obtain better performance than a standard approach on 20...

  11. The CEDICAE and the paper collections conservation and restoration Laboratory at CNEA : present and future organization and projects

    Calvo, Ana M.; Semino, Maria S.; Romero, Gregoria O.; Alfaro, Laura S.; Miranda, Maria V.; Chinen, Silvia P.

    2009-01-01

    In Ezeiza Atomic Center (CAE), there is a working group formed by staff members from a Documentation and Information Center known as 'Lic. Maria Isabel Gonzalez' (CEDICAE) and from the CNEA Paper Collections Conservation and Restoration Laboratory. New personnel were hired in 2007, which allowed the reorganization of tasks and gave way to the creation of new projects. By conducting weekly morning meetings, the working group decided to organize and plan the activities that had to be conducted. From the first moment, the main objective of the group was to offer a service of excellence, i.e. to provide a duly and timely response to the bibliographical requests made by users, to perform tasks in the laboratory, to train members in diverse subjects of preventive conservation, surveys and evaluations of archives and libraries, and tasks of restoration of our own material and material from third parties. Among the projects carried out by the CEDICAE, the following are included: Firstly, the continuous training and education of its personnel, training of users in topics dealing with the use of the MINCyT Library, participation in the Internal Network of Libraries (REDIN) in order to adopt a joint policy by CNEA libraries, participation in the Network RRIAN (Regional Network of Information for Latin America and the Caribbean in the Nuclear Field), participation in the Federal Network of Libraries and Information, with the National Commission of Public Libraries (CONABIP) and with the Documentation Center of the Ministry of Economy and so on. It has worked in training of personnel working at the institutions that submit requests to the Laboratory (SERPAJ, Monastery of San Francisco, Ministry of Economy, CONABIP, etc) regarding topics of preventive conservation. It has realised a mockup of bibliographical recovery of damaged material after any climate disasters and has conducted surveys and evaluations from the point of view of preventive conservation. In this sense and as an

  12. Scientific and interdisciplinary method as support for the restoration project. The balustrade steps of Villa Cerami

    Giulia Sanfilippo

    2015-07-01

    Full Text Available In this work an interdisciplinary study of the weathering forms of the Villa Cerami balustrade, was carried out with the aim to identify the type and causes of these and to plan conservation measures. The studied balustrade adorns and protects the steps of Villa Cerami garden, which is a suggestive example of 18th century ‘urban villa’, located in the very core of the Baroque Catania. Sadly, these stunning steps, whose magnificence and placement characterises the out-door environment of the building, at present suffer from bad degradation conditions, and the decorative details adorning the baluster are affected by irreversible damage. The causes of this ongoing degradation process are: material features, humidity, pollution and the consumption caused by the activities performed in the building. Since 1957 it has been the location of the Faculty of Law of the University of Catania. In this study, three balusters affected by the main weathering forms (biological colonization, black crust and granular disintegration recognised in the entire balustrade, were selected. The lithological type and the weathering forms were defined on the basis of an in situ investigation, using respectively the comparison of materials, to identify the calcarenites type, and the Italian norm UNI 11182 along with the Fitzner formalism, to classify the degradation forms.  A 3D survey of the selected balusters was performed with a time of flight Laser Scanner HDS300 of the Leica Geosystem with the aim to better define the volume and total surfaces of the material parts affected by erosion. The surfaces affected by black crust, were obtained by means of an image modelling technique. Data were used to calculate the damage indices through equations proposed by Fitzner and the limit at break for crushing. The potentiality of this interdisciplinary approach (architects, engineers and geologists is shown with the aim to apply it to the restoration of the entire monument

  13. Environmental assessment of the Environmental Restoration Project at Sandia National Laboratories/New Mexico

    NONE

    1996-03-01

    Sandia National Laboratories/New Mexico (SNL/NM) is managed and operated for the U.S. Department of Energy (DOE) by Sandia Corporation, a subsidiary of the Lockheed Martin Company. SNL/NM is located on land controlled by DOE within the boundaries of Kirtland Air Force Base (KAFB) in Albuquerque, New Mexico. The major responsibilities of SNL/NM are the support of national security and energy projects. This report provides an environmental assessment of proposed remedial action activities at the solid waste management units at SNL/NM. A risk assessment of health hazards is also discussed.

  14. An Ecosystem-Based Approach to Habitat Restoration Projects with Emphasis on Salmonids in the Columbia River Estuary, 2003 Technical Report.

    Johnson, G.; Thom, R.; Whiting, A. (Pacific Northwest National Laboratory)

    2003-11-01

    Habitat restoration in the Columbia River estuary (CRE) is an important off-site mitigation action in the 2000 Biological Opinion (BiOp), an operation of the Federal Columbia River Power System. The CRE, defined as the tidally influenced stretch of river from the mouth to Bonneville Dam 146 miles upstream, is part of the migration pathway for anadromous fish in the Columbia Basin, including salmon listed under the Endangered Species Act (ESA). Salmon in various stages of life, from fry to adults, use tidal channels and wetlands in the CRE to feed, find refuge from predators, and transition physiologically from freshwater to saltwater. Over the last 100 years, however, the area of some wetland habitats has decreased by as much as 70% because of dike and levee building, flow regulation, and other activities. In response to the decline in available habitat, the BiOp's Reasonable and Prudent Alternative (RPA) included mandates to 'develop a plan addressing the habitat needs of juvenile salmon and steelhead in the estuary' (RPA Action 159) and 'develop and implement an estuary restoration program with a goal of protecting and enhancing 10,000 acres of tidal wetlands and other key habitats' (RPA Action 160). To meet Action 159 and support Action 160, this document develops a science-based approach designed to improve ecosystem functions through habitat restoration activities in the CRE. The CRE habitat restoration program's goal and principles focus on habitat restoration projects in an ecosystem context. Since restoration of an entire ecosystem is not generally practical, individual habitat restoration projects have the greatest likelihood of success when they are implemented with an ecosystem perspective. The program's goal is: Implementation of well-coordinated, scientifically sound projects designed to enhance, protect, conserve, restore, and create 10,000 acres of tidal wetlands and other key habitats to aid rebuilding of ESA

  15. Rapid in vitro multiplication and restoration of Celastrus paniculatus Willd. sub sp. paniculatus (Celastraceae), a medicinal woody climber.

    Nair, L G; Seeni, S

    2001-07-01

    Nodes, shoot tips, internodes and leaf bases (approximately 1.0 cm) excised from young vines of the flowering woody climber, Celastrus paniculatus WilId. sub. sp. paniculatus (Celastraceae) were cultured in Murashige and Skoog (MS) medium containing agar (0.6%), sucrose (3%) and varied concentrations of 6-benzyl aminopurine (BAP) and kinetin. All the explant types were regenerative and maximum number (3.6) and frequency (94%) of axillary shoot formation of (5.08 cm long) was recorded in the nodes cultured in BAP (1 mg L(-1)) after 6 weeks. Combinations of BAP (1 mg L(-1)) and indole-3-acetic acid/l-naphthalene acetic acid (0.01-1 mg L(-1); IAA/NAA) tested with nodes induced formation of less number (3 and 2.2) of shoots at same frequency (94%). All the explant types viz. node, shoot tip, internode and leaf base of in vitro derived shoots responded earlier and better in lower concentrations of BAP (0.5-2 mg L(-1)) with formation of 8, 3.1, 6.4 and 1.8 shoots respectively during the same period. In spite of the advanced and increased caulogenic responses, differences in cytokinin requirements between different explants observed during culture initiation still persisted with the nodes, shoot tips, internodes and petiole segments responding best at 0.5, 1 and 2 mg L(-1) BAP, respectively. The repeated reculture up to 10 cycles of the nodes from the shoot cultures each at 6-week intervals enabled multiplication and stocking of shoots without decline. Rooting of 3-7 cm shoot cuttings was induced in half-strength MS liquid medium containing IAA (1 mg L(-1)) with formation of 7.25 roots of 2.41 cm length within 6 weeks. Rooted plants were established at 84-96% rate in community pots without hardening, the least value (84%) being obtained with NAA- induced thick and calloid rooted plants. Four month old community potted plants were reintroduced into native forest habitats at 95% efficiency and 8 months after restoration, the plants were uniform in morphological, growth

  16. Effects of salinity and particle concentration on sediment hydrodynamics and critical bed-shear-stress for erosion of fine grained sediments used in wetland restoration projects

    Ghose-Hajra, M.; McCorquodale, A.; Mattson, G.; Jerolleman, D.; Filostrat, J.

    2015-03-01

    Sea-level rise, the increasing number and intensity of storms, oil and groundwater extraction, and coastal land subsidence are putting people and property at risk along Louisiana's coast, with major implications for human safety and economic health of coastal areas. A major goal towards re-establishing a healthy and sustainable coastal ecosystem has been to rebuild Louisiana's disappearing wetlands with fine grained sediments that are dredged or diverted from nearby rivers, channels and lakes to build land in open water areas. A thorough geo-hydrodynamic characterization of the deposited sediments is important in the correct design and a more realistic outcome assessment of the long-term performance measures for ongoing coastal restoration projects. This paper evaluates the effects of salinity and solid particle concentration on the re-suspension characteristics of fine-grained dredged sediments obtained from multiple geographic locations along the Gulf coast. The critical bed-shear-stress for erosion has been evaluated as a function of sedimentation time. The sediment hydrodynamic properties obtained from the laboratory testing were used in a numerical coastal sediment distribution model to aid in evaluating sediment diversions from the Mississippi River into Breton Sound and Barataria Bay.

  17. Effects of salinity and particle concentration on sediment hydrodynamics and critical bed-shear-stress for erosion of fine grained sediments used in wetland restoration projects

    M. Ghose-Hajra

    2015-03-01

    Full Text Available Sea-level rise, the increasing number and intensity of storms, oil and groundwater extraction, and coastal land subsidence are putting people and property at risk along Louisiana’s coast, with major implications for human safety and economic health of coastal areas. A major goal towards re-establishing a healthy and sustainable coastal ecosystem has been to rebuild Louisiana’s disappearing wetlands with fine grained sediments that are dredged or diverted from nearby rivers, channels and lakes to build land in open water areas. A thorough geo-hydrodynamic characterization of the deposited sediments is important in the correct design and a more realistic outcome assessment of the long-term performance measures for ongoing coastal restoration projects. This paper evaluates the effects of salinity and solid particle concentration on the re-suspension characteristics of fine-grained dredged sediments obtained from multiple geographic locations along the Gulf coast. The critical bed-shear-stress for erosion has been evaluated as a function of sedimentation time. The sediment hydrodynamic properties obtained from the laboratory testing were used in a numerical coastal sediment distribution model to aid in evaluating sediment diversions from the Mississippi River into Breton Sound and Barataria Bay.

  18. Evaluating the accotink creek restoration project for improving water quality, in-stream habitat, and bank stability

    Struck, S.D.; Selvakumar, A.; Hyer, K.; O'Connor, T.

    2007-01-01

    Increased urbanization results in a larger percentage of connected impervious areas and can contribute large quantities of stormwater runoff and significant quantities of debris and pollutants (e.g., litter, oils, microorganisms, sediments, nutrients, organic matter, and heavy metals) to receiving waters. To improve water quality in urban and suburban areas, watershed managers often incorporate best management practices (BMPs) to reduce the quantity of runoff as well as to minimize pollutants and other stressors contained in stormwater runoff. It is well known that land-use practices directly impact urban streams. Stream flows in urbanized watersheds increase in magnitude as a function of impervious area and can result in degradation of the natural stream channel morphology affecting the physical, chemical, and biological integrity of the stream. Stream bank erosion, which also increases with increased stream flows, can lead to bank instability, property loss, infrastructure damage, and increased sediment loading to the stream. Increased sediment loads may lead to water quality degradation downstream and have negative impacts on fish, benthic invertebrates, and other aquatic life. Accotink Creek is in the greater Chesapeake Bay and Potomac watersheds, which have strict sediment criteria. The USEPA (United States Environmental Protection Agency) and USGS (United States Geological Survey) are investigating the effectiveness of stream restoration techniques as a BMP to decrease sediment load and improve bank stability, biological integrity, and in-stream water quality in an impaired urban watershed in Fairfax, Virginia. This multi-year project continuously monitors turbidity, specific conductance, pH, and water temperature, as well as biological and chemical water quality parameters. In addition, physical parameters (e.g., pebble counts, longitudinal and cross sectional stream surveys) were measured to assess geomorphic changes associated with the restoration. Data

  19. Valuing Externalities of Watershed Restoration and Erosion Control Projects in Mediterranean Basins: A Comparative Analysis of the Contingent Valuation and Replacement Cost Methods

    Saez, Maria Del Carmen Almansa; Calatrava-Requena, Javier

    2002-01-01

    The methodology used for Economic Valuation of the Externalities generated by the Watershead Restoration and Erosion Control Projects in the Hydrographic Basins of the Mediterranean Slope, is based on the Replacement Cost Method. Environmental Economics, however, today offer us other methodological possibilities, whose application to the valuation of this type of project may prove to be of interest. It is the case of the Contingent Valuation Method used for the evaluation of the effects of th...

  20. Anacostia River fringe wetlands restoration project: final report for the five-year monitoring program (2003 through 2007)

    Krafft, Cairn C.; Hammerschlag, Richard S.; Guntenspergen, Glenn R.

    2009-01-01

    The 6-hectare (ha) freshwater tidal Anacostia River Fringe Wetlands (Fringe Wetlands) were reconstructed along the mainstem of the Anacostia River in Washington, DC (Photograph 1, Figure 1) during the summer of 2003. The Fringe Wetlands consist of two separate planting cells. Fringe A, located adjacent to Lower Kingman Island, on the west bank of the Anacostia River, occupies 1.6 ha; Fringe B, located on the east bank of the Anacostia River, occupies 4.4 ha. This project is the third in a series of freshwater tidal wetland reconstructions on the Anacostia River designed and implemented by the US Army Corps of Engineers (USACE) Baltimore District and District Department of the Environment (DDOE) on lands managed by the National Park Service (NPS). The first was Kenilworth Marsh, reconstructed in 1993 (Syphax and Hammerschlag 2005); the second was Kingman Marsh, reconstructed in 2000 (Hammerschlag et al. 2006). Kenilworth and Kingman were both constructed in low-energy backwaters of the Anacostia. However, the Fringe Wetlands, which were constructed on two pre-existing benches along the high-energy mainstem, required sheet piling to provide protection from erosive impacts of increased flow and volume of water associated with storm events during the establishment phase (Photograph 2). All three projects required the placement of dredged sediment materials to increase elevations enough to support emergent vegetation (Photograph 3). The purpose of all three wetland reconstruction projects was to restore pieces of the once extensive tidal freshwater marsh habitat that bordered the Anacostia River historically, prior to the dredge and fill operations and sea wall installation that took place there in the early to mid-1900's (Photograph 4).

  1. Planning for environmental restoration of uranium mining and milling sites in Central and Eastern Europe. Proceedings of a workshop held under the technical co-operation project RER/9/022 on environmental restoration in Central and Eastern Europe

    NONE

    1997-11-01

    An IAEA Regional Technical Co-operation (TC) project RER/9/022 on ``Environmental Restoration`` for central and eastern Europe and the former USSR was launched in 1992 and concluded at the end of 1996. The first phase of this project had the primary purpose of identifying and characterizing radioactively contaminated sites in the region, including evaluation of doses to the general public and other environmental impacts. The main result of this phase of the project were published in IAEA-TECDOC-865. A new 1995-1996 phase of the project focused on the radioactive contamination of uranium mining and milling sites and the development of plans for environmental restoration of these sites. While the 1993-1994 phase aimed at attracting the attention of Member States in the region to a long neglected problem, the second phase served as a stimulus to initiate concrete planning activities that would lead to corrective actions in highly contaminated areas in those countries. As a consequence, the project emphasis shifted from scientific discussions to the identification of responsibilities, planning activities, and the assessment of existing and required resources for the eventual implementation of restoration plans. The 1995-1996 phase of the project consisted of a planning meeting and three workshops that addressed different topical themes. The papers compiled in this publication were presented at the last workshop, held in Felix, Romania, 4-8 November 1996. They summarize national situations in environmental contamination as of the end of 1996 and ongoing or planned actions for remediation. Refs, figs, tabs.

  2. Ensuring comparability of data generated by multiple analytical laboratories for environmental decision making at the Fernald Environmental Management Project

    Sutton, C.; Campbell, B.A.; Danahy, R.J.; Dugan, T.A.; Tomlinson, F.K.

    1994-01-01

    The Fernald Environmental Management Project is a US Department of Energy (DOE)-owned facility located 17 miles northwest of Cincinnati, Ohio. From 1952 until 1989, the Fernald site provided high-purity uranium metal products to support US defense programs. In 1989 the mission of Fernald changed from one of uranium production to one of environmental restoration. At Fernald, multiple functional programs require analytical data. Inorganic and organic data for these programs are currently generated by seven laboratories, while radiochemical data are being obtained from six laboratories. Quality Assurance (QA) and Quality Control (QC) programs have been established to help ensure comparability of data generated by multiple laboratories at different times. The quality assurance program for organic and inorganic measurements specifies which analytical methodologies and sample preparation procedures are to be used based on analyte class, sample matrix, and data quality requirements. In contrast, performance specifications have been established for radiochemical analyses. A blind performance evaluation program for all laboratories, both on-site and subcontracted commercial laboratories, provides continuous feedback on data quality. The necessity for subcontractor laboratories to participate in the performance evaluation program is a contractual requirement. Similarly, subcontract laboratories are contractually required to generate data which meet radiochemical performance specifications. The Fernald on-site laboratory must also fulfill these requirements

  3. 78 FR 56921 - South Bay Salt Pond Restoration Project, Phase 2 (Ponds R3, R4, R5, S5, A1, A2W, A8, A8S, A19...

    2013-09-16

    ...-F2013227943] South Bay Salt Pond Restoration Project, Phase 2 (Ponds R3, R4, R5, S5, A1, A2W, A8, A8S, A19... South Bay Salt Pond Restoration Project and consists of restoring and enhancing over 2,000 acres of... Pollution Control Plant located at 700 Los Esteros Road, San Jose, California. The details of the public...

  4. Restoration of Apollo Data by the Lunar Data Project/PDS Lunar Data Node: An Update

    Williams, David R.; Hills, H. Kent; Taylor, Patrick T.; Grayzeck, Edwin J.; Guinness, Edward A.

    2016-01-01

    The Apollo 11, 12, and 14 through 17 missions orbited and landed on the Moon, carrying scientific instruments that returned data from all phases of the missions, included long-lived Apollo Lunar Surface Experiments Packages (ALSEPs) deployed by the astronauts on the lunar surface. Much of these data were never archived, and some of the archived data were on media and in formats that are outmoded, or were deposited with little or no useful documentation to aid outside users. This is particularly true of the ALSEP data returned autonomously for many years after the Apollo missions ended. The purpose of the Lunar Data Project and the Planetary Data System (PDS) Lunar Data Node is to take data collections already archived at the NASA Space Science Data Coordinated Archive (NSSDCA) and prepare them for archiving through PDS, and to locate lunar data that were never archived, bring them into NSSDCA, and then archive them through PDS. Preparing these data for archiving involves reading the data from the original media, be it magnetic tape, microfilm, microfiche, or hard-copy document, converting the outmoded, often binary, formats when necessary, putting them into a standard digital form accepted by PDS, collecting the necessary ancillary data and documentation (metadata) to ensure that the data are usable and well-described, summarizing the metadata in documentation to be included in the data set, adding other information such as references, mission and instrument descriptions, contact information, and related documentation, and packaging the results in a PDS-compliant data set. The data set is then validated and reviewed by a group of external scientists as part of the PDS final archive process. We present a status report on some of the data sets that we are processing.

  5. The Development of the Comic Spirit in 17th Century England from James Shirley to William Congreve. Curriculum Projects, April 7-June 16, 1992. The Huntington Theatre Company Master Works Study in Restoration Comedy.

    Huntington Theatre Co., Boston, MA.

    Developed by the participants of the Huntington Theatre Company's Master Works Study in Restoration Comedy, this collection presents one-day lesson plans and curriculum projects for teaching Restoration comedy. The collection offers 15 one-day lesson plans and 15 curriculum projects (ranging over several weeks) suitable for secondary school…

  6. Performance Evaluation and Field Application of Porous Vegetation Concrete Made with By-Product Materials for Ecological Restoration Projects

    Hwang-Hee Kim

    2016-03-01

    Full Text Available The purpose of this study was to evaluate the performance of porous vegetation concrete block made from blast furnace slag cement containing industrial by-products such as blast furnace slag aggregate and powder. The blocks were tested for void ratio, compressive strength and freeze-thaw resistance to determine the optimal mixing ratio for the porous vegetation block. An economic analysis of the mixing ratio showed that the economic efficiency increased when blast furnace slag aggregate and cement were used. Porous vegetation concrete blocks for river applications were designed and produced. Hydraulic safety, heavy metal elution and vegetation tests were completed after the blocks were applied in the field. The measured tractive force ranged between 7.0 kg/m2 for fascine revetment (vegetation revetment and 16.0 kg/m2 for stone pitching (hard revetment, which ensured sufficient hydraulic stability in the field. Plant growth was measured after the porous vegetation concrete block was placed in the field. Seeds began to sprout one week after seeding; after six weeks, the plant length exceeded 300 mm. The average coverage ratio reached as high as 90% after six weeks of vegetation. These results clearly indicated that the porous vegetation concrete block was suitable for environmental restoration projects.

  7. WIRE project- Soil water repellence in biodiverse semi arid environments: new insights and implications for ecological restoration

    Muñoz-Rojas, Miriam; Jiménez-Morillo, Nicasio T.; Jordan, Antonio; Zavala, Lorena M.; Stevens, Jason; González-Pérez, Jose Antonio

    2017-04-01

    Background Soil water repellency (SWR) can have a critical effect on the restoration of disturbed ecosystems causing poor plant establishment and promoting erosion processes. Although SWR has been reported in most continents of the world for different soil types, climate conditions and land uses, there are still many research gaps in the knowledge of its causes and controlling factors (Doerr et al.,2000; Jordan et al., 2013), particularly in Mediterranean arid semi arid environments which are largely affected by this phenomenon. The WIRE project aims to investigate SWR in soils under different vegetation types of dominant biodiverse ecosystems of Western Australia (WA), e.g. hummock grasslands and Banksia woodlands, as well as characterizing organic compounds that induce hydrophobicity in these soils. Banksia woodlands (BW) are of particular interest in this project. These are iconic ecosystems of WA composed by an overstorey dominated by Proteaceae that are threatened by sand mining activities and urban expansion. Conservation and restoration of these woodlands are critical but despite considerable efforts to restore these areas, the success of current rehabilitation programs is poor due to the high sensitivity of the ecosystem to drought stress and the disruption of water dynamics in mature BW soils that result in low seedling survival rates (5-30%). The main objectives of this collaborative research are: i) to identify SWR intensity and severity under different vegetation types and evaluate controlling factors in both hummock grasslands and BW (ii) to characterize hydrophobic compounds in soils using analytical pyrolysis techniques and iii) to investigate the impact of SWR on water economy in relation with soil functioning and plant strategies for water uptake in pristine BW. Methods In a series of field trials and experimental studies, we measured SWR of soil samples under lab conditions in oven-dry samples (48 h, 105 °C) that were previously collected under

  8. Web application to access U.S. Army Corps of Engineers Civil Works and Restoration Projects information for the Rio Grande Basin, southern Colorado, New Mexico, and Texas

    Archuleta, Christy-Ann M.; Eames, Deanna R.

    2009-01-01

    The Rio Grande Civil Works and Restoration Projects Web Application, developed by the U.S. Geological Survey in cooperation with the U.S. Army Corps of Engineers (USACE) Albuquerque District, is designed to provide publicly available information through the Internet about civil works and restoration projects in the Rio Grande Basin. Since 1942, USACE Albuquerque District responsibilities have included building facilities for the U.S. Army and U.S. Air Force, providing flood protection, supplying water for power and public recreation, participating in fire remediation, protecting and restoring wetlands and other natural resources, and supporting other government agencies with engineering, contracting, and project management services. In the process of conducting this vast array of engineering work, the need arose for easily tracking the locations of and providing information about projects to stakeholders and the public. This fact sheet introduces a Web application developed to enable users to visualize locations and search for information about USACE (and some other Federal, State, and local) projects in the Rio Grande Basin in southern Colorado, New Mexico, and Texas.

  9. Planning for environmental restoration of radioactively contaminated sites in central and eastern Europe. V. 3: Technologies for, and the implementation of, environmental restoration of contaminated sites. Proceedings of a workshop held within the technical co-operation project

    NONE

    1996-05-01

    The radioactive contaminant materials resulting from diverse activities in relation to the nuclear fuel cycle, defence related operations, and various industries in addition to medical and research facilities represent perhaps the most severe and immense pollution left from a past era. The political changes in central and eastern Europe (CEE) not only brought some disclosure of the radioactively contaminated sites, but also resulted in a political condition in which this region became receptive to co-operation from a range of outside countries. The subjects of the first workshop held in Budapest, 4-8 October 1993, was the identification and characterization of radioactively contaminated sites in the region. The second part of the project and the second workshop (Piestany, Slovak Republic, 12-16 April 1994) involved planning and preparing the identified sites for restoration. This included items such as the restoration objectives, dose and environmental assessment, cost analysis, strategy and prioritization. Eventually, the third part of the project covered technologies for, and the implementation of, environmental restoration. The third and final workshop was held in Rez, Czech Republic, 12-16 December 1994. Refs, figs, tabs.

  10. Planning for environmental restoration of radioactively contaminated sites in central and eastern Europe. V. 3: Technologies for, and the implementation of, environmental restoration of contaminated sites. Proceedings of a workshop held within the technical co-operation project

    1996-05-01

    The radioactive contaminant materials resulting from diverse activities in relation to the nuclear fuel cycle, defence related operations, and various industries in addition to medical and research facilities represent perhaps the most severe and immense pollution left from a past era. The political changes in central and eastern Europe (CEE) not only brought some disclosure of the radioactively contaminated sites, but also resulted in a political condition in which this region became receptive to co-operation from a range of outside countries. The subjects of the first workshop held in Budapest, 4-8 October 1993, was the identification and characterization of radioactively contaminated sites in the region. The second part of the project and the second workshop (Piestany, Slovak Republic, 12-16 April 1994) involved planning and preparing the identified sites for restoration. This included items such as the restoration objectives, dose and environmental assessment, cost analysis, strategy and prioritization. Eventually, the third part of the project covered technologies for, and the implementation of, environmental restoration. The third and final workshop was held in Rez, Czech Republic, 12-16 December 1994. Refs, figs, tabs

  11. CosmoQuest Year 1.5: Citizen Scientist Behaviors and Site Usage Across Multiple Projects

    Gugliucci, Nicole E.; Gay, P. L.; Bracey, G.; CosmoQuest Team

    2013-06-01

    CosmoQuest launched as a citizen science portal in January 2012 and has since expanded to include three projects in planetary surface mapping, one completed project searching for KBOs, and several more on the way with various astrophysical science goals. We take a close look at how our users move through the site, how much time they spend on various tasks, project retention rate, and how many use multiple projects on the site. We are also piloting a citizen science motivation survey given to random site users to find out why citizen scientists join new projects and continue to participate. This is part of a larger project using online and real-life interactions to study citizen scientist behaviors, motivations, and learning with a goal of building better community with researchers, volunteers, educators, and developers.

  12. Water quality in South San Francisco Bay, California: current condition and potential issues for the South Bay Salt Pond Restoration Project.

    Grenier, J Letitia; Davis, Jay A

    2010-01-01

    The SBSPRP is an extensive tidal wetland restoration project that is underway at the margin of South San Francisco Bay, California. The Project, which aims to restore former salt ponds to tidal marsh and manage other ponds for water bird support, is taking place in the context of a highly urbanized watershed and an Estuary already impacted by chemical contaminants. There is an intimate relationship between water quality in the watershed, the Bay, and the transitional wetland areas where the Project is located. The Project seeks to restore habitat for endangered and endemic species and to provide recreational opportunities for people. Therefore, water quality and bioaccumulation of contaminants in fish and wildlife is an important concern for the success of the Project. Mercury, PCBs, and PBDEs are the persistent contaminants of greatest concern in the region. All of these contaminants are present at elevated concentrations both in the abiotic environment and in wildlife. Dioxins, pyrethroids, PAHs, and selenium are also problematic. Organochlorine insecticides have historically impacted the Bay, and they remain above thresholds for concern in a small proportion of samples. Emerging contaminants, such as PFCs and non-PBDE flame retardants, are also an important water quality issue. Beyond chemical pollutants, other concerns for water quality in South San Francisco Bay exist, and include biological constituents, especially invasive species, and chemical attributes, such as dissolved oxygen and salinity. Future changes, both from within the Project and from the Bay and watershed, are likely to influence water quality in the region. Project actions to restore wetlands could worsen, improve, or not affect the already impaired water quality in South Bay. Accelerated erosion of buried sediment as a consequence of Project restoration actions is a potentially serious regional threat to South Bay water and sediment quality. Furthermore, the planned restoration of salt ponds

  13. An outline of a model-based expert system to identify optimal remedial strategies for restoring contaminated aquatic ecosystems: the project MOIRA

    Appelgren, A.; Bergstrom, U.; Brittain, J.; Monte, L.

    1996-10-01

    The present report describes the fundamental principles of the research programme MOIRA (a model based computerized system for management support to Identify optimal remedial strategies for Restoring radionuclide contaminated Aquatic ecosystems and drainage areas) financed by the EC (European Community) (Contract N F14P-CT96-0036). The interventions to restore radionuclides contaminated aquatic systems may result in detrimental ecological, social and economical effects. Decision makers must carefully evaluate these impacts. The main aim of the MOIRA project is the development of an expert system based on validated models predicting the evolution of the radioactive contamination of fresh water systems following countermeasure applications and their relevant ecological, social and economical impacts. The expert system will help decision makers, that are not necessarily gifted with experience in environmental modeling, to identify optimal remedial strategies for restoring contaminated fresh water systems

  14. An outline of a model-based expert system to identify optimal remedial strategies for restoring contaminated acquatic ecosystems: The project ``moira``

    Appelgren, A.; Bergstrom, U. [Studsvik Eco and AB, Nykoping (Sweden); Brittain, J. [Oslo Univ. (Norway). LFI Zoological Museum; Gallego Diaz, E. [Madrid Universidad Politecnica (Spain). Dept. de Ingenieria Nuclear; Hakanson, L. [KEMA Nuclear, Arnhem (Niger); Monte, L. [ENEA, Centro Ricerche Casaccia, Rome (Italy). Dip. Ambiente

    1996-10-01

    The present report describes the fundamental principles of the research programme MOIRA (a model based computerized system for management support to Identify optimal remedial strategies for Restoring radionuclide contaminated Aquatic ecosystems and drainage areas) financed by the EC (European Community) (Contract N F14P-CT96-0036). The interventions to restore radionuclides contaminated aquatic systems may result in detrimental ecological, social and economical effects. Decision makers must carefully evaluate these impacts. The main aim of the MOIRA project is the development of an expert system based on validated models predicting the evolution of the radioactive contamination of fresh water systems following countermeasure applications and their relevant ecological, social and economical impacts. The expert system will help decision makers, that are not necessarily gifted with experience in environmental modeling, to identify optimal remedial strategies for restoring contaminated fresh water systems.

  15. Consistency of climate change projections from multiple global and regional model intercomparison projects

    Fernández, J.; Frías, M. D.; Cabos, W. D.; Cofiño, A. S.; Domínguez, M.; Fita, L.; Gaertner, M. A.; García-Díez, M.; Gutiérrez, J. M.; Jiménez-Guerrero, P.; Liguori, G.; Montávez, J. P.; Romera, R.; Sánchez, E.

    2018-03-01

    We present an unprecedented ensemble of 196 future climate projections arising from different global and regional model intercomparison projects (MIPs): CMIP3, CMIP5, ENSEMBLES, ESCENA, EURO- and Med-CORDEX. This multi-MIP ensemble includes all regional climate model (RCM) projections publicly available to date, along with their driving global climate models (GCMs). We illustrate consistent and conflicting messages using continental Spain and the Balearic Islands as target region. The study considers near future (2021-2050) changes and their dependence on several uncertainty sources sampled in the multi-MIP ensemble: GCM, future scenario, internal variability, RCM, and spatial resolution. This initial work focuses on mean seasonal precipitation and temperature changes. The results show that the potential GCM-RCM combinations have been explored very unevenly, with favoured GCMs and large ensembles of a few RCMs that do not respond to any ensemble design. Therefore, the grand-ensemble is weighted towards a few models. The selection of a balanced, credible sub-ensemble is challenged in this study by illustrating several conflicting responses between the RCM and its driving GCM and among different RCMs. Sub-ensembles from different initiatives are dominated by different uncertainty sources, being the driving GCM the main contributor to uncertainty in the grand-ensemble. For this analysis of the near future changes, the emission scenario does not lead to a strong uncertainty. Despite the extra computational effort, for mean seasonal changes, the increase in resolution does not lead to important changes.

  16. VT River Restoration Data in Lamoille County

    Vermont Center for Geographic Information — (Link to Metadata) Documented river and riparian buffer restoration projects in Lamoille County, Vermont. Restoration includes buffer plantings (trees and shrubs),...

  17. A Case Study of Resources Management Planning with Multiple Objectives and Projects

    David L. Peterson; David G. Silsbee; Daniel L. Schmoldt

    1995-01-01

    Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decisionmaking tools. We have previously described a multiple objective planning...

  18. Making Progress: The Use of Multiple Progress Reports to Enhance Advertising Students' Media Plan Term Projects

    Kritz, Gary H.; Lozada, Hector R.; Long, Mary M.

    2007-01-01

    Since the AACSB mandates that students demonstrate effective oral and written communication skills, it is imperative that business professors do what is necessary to improve such skills. The authors investigate whether the use of using multiple progress reports in an Advertising class project improves the final product. The data results show that…

  19. Ecological restoration: Biodiversity and conservation

    Vargas Rios, Orlando

    2011-01-01

    In this essay the principal concepts and methods applied on projects aimed at ecological restoration are reviewed, with emphasis on the relationship between conservation, biodiversity and restoration. The most common definitions are provided and the steps to take into account to develop projects on ecological restoration, which will be determined by the level of degradation of the ecosystem to be intervened.

  20. A project optimization for small watercourses restoration in the northern part of the Volga-Akhtuba floodplain by the geoinformation and hydrodynamic modeling

    Voronin, Alexander; Vasilchenko, Ann; Khoperskov, Alexander

    2018-03-01

    The project of small watercourses restoration in the northern part of the Volga-Akhtuba floodplain is considered together with the aim of increasing the watering of the territory during small and medium floods. The topography irregularity, the complex structure of the floodplain valley consisting of large number of small watercourses, the presence of urbanized and agricultural areas require careful preliminary analysis of the hydrological safety and efficiency of geographically distributed project activities. Using the digital terrain and watercourses structure models of the floodplain, the hydrodynamic flood model, the analysis of the hydrological safety and efficiency of several project implementation strategies has been conducted. The objective function values have been obtained from the hydrodynamic calculations of the floodplain territory flooding for virtual digital terrain models simulating alternatives for the geographically distributed project activities. The comparative efficiency of several empirical strategies for the geographically distributed project activities, as well as a two-stage exact solution method for the optimization problem has been studied.

  1. Issues related to uncertainty in projections of hazardous and mixed waste volumes in the U.S. Department of Energy's environmental restoration program

    Picel, K.C.

    1995-01-01

    Projected volumes of contaminated media and debris at US Department of Energy (DOE) environmental restoration sites that are potentially subject to the hazardous waste provisions of the Resource Conservation and Recovery Act are needed to support programmatic planning. Such projections have been gathered in various surveys conducted under DOE's environmental restoration and waste management programs. It is expected that reducing uncertainty in the projections through review of existing site data and process knowledge and through further site characterization will result in substantially lowered projections. If promulgated, the US Environmental Protection Agency's Hazardous Waste Identification Rule would result in potentially even greater reductions in the projections when site conditions are reviewed under the provisions of the new rule. Reducing uncertainty in projections under current and future waste identification rules may be necessary to support effective remediation planning. Further characterization efforts that may be conducted should be designed to limit uncertainty in identifying volumes of wastes to the extent needed to support alternative selection and to minimize costs of remediation

  2. Technical framework for groundwater restoration

    1991-04-01

    This document provides the technical framework for groundwater restoration under Phase II of the Uranium Mill Tailings Remedial Action (UMTRA) Project. A preliminary management plan for Phase II has been set forth in a companion document titled ''Preplanning Guidance Document for Groundwater Restoration''. General principles of site characterization for groundwater restoration, restoration methods, and treatment are discussed in this document to provide an overview of standard technical approaches to groundwater restoration

  3. Biological restoration of major transportation facilities domestic demonstration and application project (DDAP): technology development at Sandia National Laboratories.

    Ramsey, James L., Jr. (.,; .); Melton, Brad; Finley, Patrick; Brockman, John; Peyton, Chad E.; Tucker, Mark David; Einfeld, Wayne; Griffith, Richard O.; Brown, Gary Stephen; Lucero, Daniel A.; Betty, Rita G.; McKenna, Sean Andrew; Knowlton, Robert G.; Ho, Pauline

    2006-06-01

    The Bio-Restoration of Major Transportation Facilities Domestic Demonstration and Application Program (DDAP) is a designed to accelerate the restoration of transportation nodes following an attack with a biological warfare agent. This report documents the technology development work done at SNL for this DDAP, which include development of the BROOM tool, an investigation of surface sample collection efficiency, and a flow cytometry study of chlorine dioxide effects on Bacillus anthracis spore viability.

  4. Conceptual study of SCRUM and CCPM combined application in multiple project flexible management

    Ilton Marchi de Almeida

    2016-11-01

    Full Text Available Project Management (PM has gained a major role in the viability of organizational strategic objectives. The development of products and services has been under increasing market pressure, demanding frequent releases in ever-shorter time periods. To meet these new requirements, PM has to provide the information needed to make decisions in multiple complex projects that are exposed to uncertainty and volatility. Regarding the opportunities to improve PM practices in order to deal with this unstable and ambiguous environment, the aim of this paper is to propose, by means of a conceptual literature analysis, the combined application of two PM methodologies: Critical Chain Project Management (CCPM, and SCRUM. The results of this study indicate that integration of these methodologies can enhance the benefits and mitigate the weaknesses of each of them. This hybrid model could enable better articulation and coordination of project tasks, allowing more effective decisions to be made in multiple project environments affected by volatility, uncertainty, complexity and ambiguity (VUCA.

  5. Characterizing Process-Based River and Floodplain Restoration Projects on Federal Lands in Oregon, and Assessing Catalysts and Barriers to Implementation

    Bianco, S.; Jones, J. A.; Gosnell, H.

    2017-12-01

    Process-based restoration, a new approach to river and floodplain management, is being implemented on federal lands across Oregon. These management efforts are aimed at promoting key physical processes in order to improve river ecological function, create diverse habitat, and increase biological productivity for ESA-listed bull trout and spring Chinook salmon. Although the practice is being disseminated across the Pacific Northwest, it remains unclear what is driving aquatic and riparian ecosystem restoration towards this process-based approach and away from form-based methods such as Rosgen's Natural Channel Design. The technical aspects of process-based restoration have been described in the literature (ex. Beechie et al. 2010), but little is known about the practice from a social science perspective, and few case studies exist to assess the impact of these efforts. We combine semi-structured qualitative interviews with management experts and photogrammetric analysis to better understand how complex social processes and changing ideas about aquatic ecosystems are manifesting on the ground in federal land management. This study characterizes process-based river and floodplain restoration projects on federal lands in Oregon, and identifies catalysts and barriers to its implementation. The Deer Creek Floodplain Enhancement project serves as a case study for photogrammetric analysis. To characterize long-term changes at Deer Creek, geomorphic features were mapped and classified using orthoimage mosaics developed from a time series of historic aerial photographs dating back to 1954. 3D Digital Elevation Models (3D-DEMs) were created of portions of the modified sections of Deer Creek and its floodplain immediately before and after restoration using drone-captured aerial photography and a photogrammetric technique called Structure from Motion. These 3D-DEMs have enabled extraction of first-order geomorphic variables to compare pre- and post-project conditions. This

  6. Adaptive modified function projective synchronization of multiple time-delayed chaotic Rossler system

    Sudheer, K. Sebastian; Sabir, M.

    2011-01-01

    In this Letter we consider modified function projective synchronization of unidirectionally coupled multiple time-delayed Rossler chaotic systems using adaptive controls. Recently, delay differential equations have attracted much attention in the field of nonlinear dynamics. The high complexity of the multiple time-delayed systems can provide a new architecture for enhancing message security in chaos based encryption systems. Adaptive control can be used for synchronization when the parameters of the system are unknown. Based on Lyapunov stability theory, the adaptive control law and the parameter update law are derived to make the state of two chaotic systems are function projective synchronized. Numerical simulations are presented to demonstrate the effectiveness of the proposed adaptive controllers.

  7. The Management of Dissonance in Nature Restoration

    Clemmensen, Thomas Juel

    2016-01-01

    Nature restoration is far from a neural undertaking. Just like any other type of heritage production, it can be the source of dissonance—‘our’ nature is not necessary ‘their’ nature. Often this dissonance is managed in ways, which are not particularly sensitive to site-specificity. As exemplified...... for multiple interpretations to coexist. Indications can be found in the Re-naturalization of River Aire (2002-2015)—a restoration project, which reveals approaches that could be labelled landscape architecture specific....

  8. The Management of Dissonance in Nature Restoration

    Clemmensen, Thomas Juel

    2014-01-01

    Nature restoration is far from a neural undertaking. Just like any other type of heritage production, it can be the source of dissonance—‘our’ nature is not necessary ‘their’ nature. Often this dissonance is managed in ways, which are not particularly sensitive to site-specificity. As exemplified...... for multiple interpretations to coexist. Indications can be found in the Re-naturalization of River Aire (2002-2015)—a restoration project, which reveals approaches that could be labelled landscape architecture specific....

  9. Management of Globally Distributed Software Development Projects in Multiple-Vendor Constellations

    Schott, Katharina; Beck, Roman; Gregory, Robert Wayne

    Global information systems development outsourcing is an apparent trend that is expected to continue in the foreseeable future. Thereby, IS-related services are not only increasingly provided from different geographical sites simultaneously but beyond that from multiple service providers based in different countries. The purpose of this paper is to understand how the involvement of multiple service providers affects the management of the globally distributed information systems development projects. As research on this topic is scarce, we applied an exploratory in-depth single-case study design as research approach. The case we analyzed comprises a global software development outsourcing project initiated by a German bank together with several globally distributed vendors. For data collection and data analysis we have adopted techniques suggested by the grounded theory method. Whereas the extant literature points out the increased management overhead associated with multi-sourcing, the analysis of our case suggests that the required effort for managing global outsourcing projects with multiple vendors depends among other things on the maturation level of the cooperation within the vendor portfolio. Furthermore, our data indicate that this interplay maturity is positively impacted through knowledge about the client that has been derived based on already existing client-vendor relationships. The paper concludes by offering theoretical and practical implications.

  10. Simplified fringe order correction for absolute phase maps recovered with multiple-spatial-frequency fringe projections

    Ding, Yi; Peng, Kai; Lu, Lei; Zhong, Kai; Zhu, Ziqi

    2017-01-01

    Various kinds of fringe order errors may occur in the absolute phase maps recovered with multi-spatial-frequency fringe projections. In existing methods, multiple successive pixels corrupted by fringe order errors are detected and corrected pixel-by-pixel with repeating searches, which is inefficient for applications. To improve the efficiency of multiple successive fringe order corrections, in this paper we propose a method to simplify the error detection and correction by the stepwise increasing property of fringe order. In the proposed method, the numbers of pixels in each step are estimated to find the possible true fringe order values, repeating the search in detecting multiple successive errors can be avoided for efficient error correction. The effectiveness of our proposed method is validated by experimental results. (paper)

  11. Application of science-based restoration planning to a desert river system

    Laub, Brian G.; Jimenez, Justin; Budy, Phaedra

    2015-01-01

    Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.

  12. Application of Science-Based Restoration Planning to a Desert River System

    Laub, Brian G.; Jimenez, Justin; Budy, Phaedra

    2015-06-01

    Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.

  13. Principles of Wetland Restoration

    the return of a degraded ecosystem to a close approximation of its remaining natural potential - is experiencing a groundswell of support across the United States. The number of stream, river, lake, wetland and estuary restoration projects grows yearly

  14. Evaluation of social attraction measures to establish Forster’s tern (Sterna forsteri) nesting colonies for the South Bay Salt Pond Restoration Project, San Francisco Bay, California—2017 Annual Report

    Hartman, C. Alex; Ackerman, Joshua T.; Herzog, Mark P.; Wang, Yiwei; Strong, Cheryl

    2018-05-31

    Forster’s terns (Sterna forsteri), historically one of the most numerous colonial-breeding waterbirds in South San Francisco Bay, California, have had recent decreases in the number of nesting colonies and overall breeding population size. The South Bay Salt Pond (SBSP) Restoration Project aims to restore 50–90 percent of former salt evaporation ponds to tidal marsh habitat in South San Francisco Bay. This restoration will remove much of the historical island nesting habitat used by Forster’s terns, American avocets (Recurvirostra americana), and other waterbirds. To address this issue, the SBSP Restoration Project organized the construction of new nesting islands in managed ponds that will not be restored to tidal marsh, thereby providing enduring island nesting habitat for waterbirds. In 2012, 16 new islands were constructed in Pond A16 in the Alviso complex of the Don Edwards San Francisco Bay National Wildlife Refuge, increasing the number of islands in this pond from 4 to 20. However, despite a history of nesting on the four historical islands in Pond A16 before 2012, no Forster’s terns have nested in Pond A16 since the new islands were constructed.In 2017, we used social attraction measures (decoys and electronic call systems) to attract Forster’s terns to islands within Pond A16 to re-establish nesting colonies. We maintained these systems from March through August 2017. To evaluate the effect of these social attraction measures, we also completed waterbird surveys between April and August, where we recorded the number and location of all Forster’s terns and other waterbirds using Pond A16, and monitored waterbird nests. We compared bird survey and nest monitoring data collected in 2017 to data collected in 2015 and 2016, prior to the implementation of social attraction measures, allowing for direct evaluation of social attraction efforts on Forster’s terns.To increase the visibility and stakeholder involvement of this project, we engaged in

  15. Managing multiple projects: a literature review of setting priorities and a pilot survey of healthcare researchers in an academic setting.

    Hopkins, Robert Borden; Campbell, Kaitryn; O'Reilly, Daria; Tarride, Jean-Eric; Bowen, Jim; Blackhouse, Gord; Goerre, Ron

    2007-05-16

    To summarize and then assess with a pilot study the use of published best practice recommendations for priority setting during management of multiple healthcare research projects, in a resource-constrained environment. Medical, economic, business, and operations literature was reviewed to summarize and develop a survey to assess best practices for managing multiple projects. Fifteen senior healthcare research project managers, directors, and faculty at an urban academic institution were surveyed to determine most commonly used priority rules, ranking of rules, characteristics of their projects, and availability of resources. Survey results were compared to literature recommendations to determine use of best practices. Seven priority-setting rules were identified for managing multiple projects. Recommendations on assigning priorities by project characteristics are presented. In the pilot study, a large majority of survey respondents follow best practice recommendations identified in the research literature. However, priority rules such as Most Total Successors (MTS) and Resource Scheduling Method (RSM) were used "very often" by half of the respondents when better performing priority rules were available. Through experience, project managers learn to manage multiple projects under resource constraints. Best practice literature can assist project managers in priority setting by recommending the most appropriate priority given resource constraints and project characteristics. There is room for improvement in managing multiple projects.

  16. Effect of vegetation structure on breeding territory selection by red-winged blackbirds in a floodplain forest restoration project

    Maria A. Furey; Dirk E. Burhans; Hong He; Michael A. Gold; Bruce E. Cutter

    2003-01-01

    Our research investigates the role of vegetation structure in the selection of breeding territories by red-winged blackbirds (Agelaius phoeniceus) in two floodplain oak-restoration sites. Perches are used extensively by red-winged blackbirds in territorial display during the spring (Yasukawa and Searcy 1995). We hypothesized that breeding territory...

  17. Identification of remediation needs and technology development focus areas for the Environmental Restoration (ER) Project at Sandia National Laboratories/New Mexico (SNL/NM)

    Tucker, M.D.

    1995-06-01

    The Environmental Restoration (ER) Project has been tasked with the characterization, assessment, remediation and long-term monitoring of contaminated waste sites at Sandia National Laboratories/New Mexico (SNL/NM). Many of these sites will require remediation which will involve the use of baseline technologies, innovative technologies that are currently under development, and new methods which will be developed in the near future. The Technology Applications Program (TAP) supports the ER Project and is responsible for development of new technologies for use at the contaminated waste sites, including technologies that will be used for remediation and restoration of these sites. The purpose of this report is to define the remediation needs of the ER Project and to identify those remediation needs for which the baseline technologies and the current development efforts are inadequate. The area between the remediation needs and the existing baseline/innovative technology base represents a technology gap which must be filled in order to remediate contaminated waste sites at SNL/NM economically and efficiently. In the first part of this report, the remediation needs of the ER Project are defined by both the ER Project task leaders and by TAP personnel. The next section outlines the baseline technologies, including EPA defined Best Demonstrated Available Technologies (BDATs), that are applicable at SNL/NM ER sites. This is followed by recommendations of innovative technologies that are currently being developed that may also be applicable at SNL/NM ER sites. Finally, the gap between the existing baseline/innovative technology base and the remediation needs is identified. This technology gap will help define the future direction of technology development for the ER Project

  18. Early cost estimating for road construction projects using multiple regression techniques

    Ibrahim Mahamid

    2011-12-01

    Full Text Available The objective of this study is to develop early cost estimating models for road construction projects using multiple regression techniques, based on 131 sets of data collected in the West Bank in Palestine. As the cost estimates are required at early stages of a project, considerations were given to the fact that the input data for the required regression model could be easily extracted from sketches or scope definition of the project. 11 regression models are developed to estimate the total cost of road construction project in US dollar; 5 of them include bid quantities as input variables and 6 include road length and road width. The coefficient of determination r2 for the developed models is ranging from 0.92 to 0.98 which indicate that the predicted values from a forecast models fit with the real-life data. The values of the mean absolute percentage error (MAPE of the developed regression models are ranging from 13% to 31%, the results compare favorably with past researches which have shown that the estimate accuracy in the early stages of a project is between ±25% and ±50%.

  19. Forest restoration, biodiversity and ecosystem functioning

    2011-01-01

    Globally, forests cover nearly one third of the land area and they contain over 80% of terrestrial biodiversity. Both the extent and quality of forest habitat continue to decrease and the associated loss of biodiversity jeopardizes forest ecosystem functioning and the ability of forests to provide ecosystem services. In the light of the increasing population pressure, it is of major importance not only to conserve, but also to restore forest ecosystems. Ecological restoration has recently started to adopt insights from the biodiversity-ecosystem functioning (BEF) perspective. Central is the focus on restoring the relation between biodiversity and ecosystem functioning. Here we provide an overview of important considerations related to forest restoration that can be inferred from this BEF-perspective. Restoring multiple forest functions requires multiple species. It is highly unlikely that species-poor plantations, which may be optimal for above-ground biomass production, will outperform species diverse assemblages for a combination of functions, including overall carbon storage and control over water and nutrient flows. Restoring stable forest functions also requires multiple species. In particular in the light of global climatic change scenarios, which predict more frequent extreme disturbances and climatic events, it is important to incorporate insights from the relation between biodiversity and stability of ecosystem functioning into forest restoration projects. Rather than focussing on species per se, focussing on functional diversity of tree species assemblages seems appropriate when selecting tree species for restoration. Finally, also plant genetic diversity and above - below-ground linkages should be considered during the restoration process, as these likely have prominent but until now poorly understood effects at the level of the ecosystem. The BEF-approach provides a useful framework to evaluate forest restoration in an ecosystem functioning context, but

  20. Planning for environmental restoration of radioactively contaminated sites in central and eastern Europe. V.2: Planning for environmental restoration of contaminated sites. Proceedings of a workshop held within the technical co-operation project

    NONE

    1996-03-01

    The radioactive contaminant materials resulting from diverse activities in relation to the nuclear fuel cycle, defence related operations, and various industries in addition to medical and research facilities represent perhaps the most severe and immense pollution left from a past era. The political changes in central and eastern Europe (CEE) not only brought some disclosure of the radioactively contaminated sites, but also resulted in a political condition in which this region became receptive to co-operation from a range of outside countries. It is under these circumstances that the IAEA decided to launch a Technical Co-operation (TC) Project on Environmental Restoration in Central and Eastern Europe. The project was initiated in the latter part of 1992 and ended in 1994. The countries that were involved and represented in this forum are: Belarus, Bulgaria, Croatia, Czech Republic, Estonia, Hungary, Kazakhstan, Poland, Romania, Russian Federation, Slovakia, Slovenia and the Ukraine. Several experts from countries outside the region participated and offered their co-operation throughout the project. Refs, figs, tabs.

  1. Planning for environmental restoration of radioactively contaminated sites in central and eastern Europe. V.2: Planning for environmental restoration of contaminated sites. Proceedings of a workshop held within the technical co-operation project

    1996-03-01

    The radioactive contaminant materials resulting from diverse activities in relation to the nuclear fuel cycle, defence related operations, and various industries in addition to medical and research facilities represent perhaps the most severe and immense pollution left from a past era. The political changes in central and eastern Europe (CEE) not only brought some disclosure of the radioactively contaminated sites, but also resulted in a political condition in which this region became receptive to co-operation from a range of outside countries. It is under these circumstances that the IAEA decided to launch a Technical Co-operation (TC) Project on Environmental Restoration in Central and Eastern Europe. The project was initiated in the latter part of 1992 and ended in 1994. The countries that were involved and represented in this forum are: Belarus, Bulgaria, Croatia, Czech Republic, Estonia, Hungary, Kazakhstan, Poland, Romania, Russian Federation, Slovakia, Slovenia and the Ukraine. Several experts from countries outside the region participated and offered their co-operation throughout the project. Refs, figs, tabs

  2. The SUMO project I. A survey of multiple populations in globular clusters

    Monelli, M.; Milone, A. P.; Stetson, P. B.; Marino, A. F.; Cassisi, S.; del Pino Molina, A.; Salaris, M.; Aparicio, A.; Asplund, M.; Grundahl, F.; Piotto, G.; Weiss, A.; Carrera, R.; Cebrián, M.; Murabito, S.; Pietrinferni, A.; Sbordone, L.

    2013-05-01

    We present a general overview and the first results of the SUMO project (a SUrvey of Multiple pOpulations in Globular Clusters). The objective of this survey is the study of multiple stellar populations in the largest sample of globular clusters homogeneously analysed to date. To this aim we obtained high signal-to-noise (S/N > 50) photometry for main sequence stars with mass down to ˜0.5 M⊙ in a large sample of clusters using both archival and proprietary U, B, V and I data from ground-based telescopes. In this paper, we focus on the occurrence of multiple stellar populations in 23 clusters. We define a new photometric index, cU, B, I = (U - B) - (B - I), which turns out to be very effective for identifying multiple sequences along the red giant branch (RGB). We found that in the V-cU, B, I diagram all clusters presented in this paper show broadened or multimodal RGBs, with the presence of two or more components. We found a direct connection with the chemical properties of different sequences, which display different abundances of light elements (O, Na, C, N and Al). The cU, B, I index is also a powerful tool for identifying distinct sequences of stars along the horizontal branch and, for the first time in the case of NGC 104 (47 Tuc), along the asymptotic giant branch. Our results demonstrate that (i) the presence of more than two stellar populations is a common feature amongst globular clusters, as already highlighted in previous work; (ii) multiple sequences with different chemical contents can be easily identified by using standard Johnson photometry obtained with ground-based facilities; (iii) in the study of globular cluster multiple stellar populations the cU, B, I index is an alternative to spectroscopy, and has the advantage of larger statistics.

  3. Use of vegetation sampling and analysis to detect a problem within a portion of a prairie restoration project.

    Franson, Raymond; Scholes, Chad; Krabbe, Stephen

    2017-01-02

    In June 2005, the Department of Energy (DOE) began establishing the 60-ha Howell Prairie around the disposal cell at the DOE Weldon Spring Site (WSS). Prairies were historically present in the area of the site. Quantitative Cover sampling was used to quantify Total Cover, Native Grass Cover, Non-Native Grass Cover, Native Forb Cover, Non-Native Forb Cover, Warm Season (C 4 Grass), Cool Season (C 3 Grass), Perennial Cover and Annual Cover, Litter, and Bare Ground. Four permanent vegetation sampling plots were established. The first 4 years of vegetation measurements at Howell Prairie were made during above-average rainfall years on burned and unburned plots. The fifth-year (2012) vegetation measurements were made after below-average rainfall. Five years of results not only document the consistency of the restoration effort in three areas, but also demonstrate deficiencies in Grass Cover in a fourth area. The results are not only useful for Howell Prairie, but will be useful for restoration work throughout the region. Restoration work suffers from a lack of success monitoring and in this case from a lack of available reference areas. Floristic Quality Indices are used to make qualitative comparisons of the site to Konza Prairie sites.

  4. Skjern River Restoration Counterfactual

    Clemmensen, Thomas Juel

    2014-01-01

    In 2003 the Skjern River Restoration Project in Denmark was awarded the prestigious Europa Nostra Prize for ‘conserving the European cultural heritage’ (Danish Nature Agency 2005). In this case, however, it seems that the conservation of one cultural heritage came at the expense of another cultural...... this massive reconstruction work, which involved moving more than 2,7 million cubic meters of earth, cause a lot of ‘dissonance’ among the local population, the resulting ‘nature’ and its dynamic processes are also constantly compromising the preferred image of the restored landscape (Clemmensen 2014......). The presentation offers insight into an on-going research and development project - Skjern River Restoration Counterfactual, which question existing trends and logics within nature restoration. The project explores how the Skjern River Delta could have been ‘restored’ with a greater sensibility for its cultural...

  5. Multiple Kernel Sparse Representation based Orthogonal Discriminative Projection and Its Cost-Sensitive Extension.

    Zhang, Guoqing; Sun, Huaijiang; Xia, Guiyu; Sun, Quansen

    2016-07-07

    Sparse representation based classification (SRC) has been developed and shown great potential for real-world application. Based on SRC, Yang et al. [10] devised a SRC steered discriminative projection (SRC-DP) method. However, as a linear algorithm, SRC-DP cannot handle the data with highly nonlinear distribution. Kernel sparse representation-based classifier (KSRC) is a non-linear extension of SRC and can remedy the drawback of SRC. KSRC requires the use of a predetermined kernel function and selection of the kernel function and its parameters is difficult. Recently, multiple kernel learning for SRC (MKL-SRC) [22] has been proposed to learn a kernel from a set of base kernels. However, MKL-SRC only considers the within-class reconstruction residual while ignoring the between-class relationship, when learning the kernel weights. In this paper, we propose a novel multiple kernel sparse representation-based classifier (MKSRC), and then we use it as a criterion to design a multiple kernel sparse representation based orthogonal discriminative projection method (MK-SR-ODP). The proposed algorithm aims at learning a projection matrix and a corresponding kernel from the given base kernels such that in the low dimension subspace the between-class reconstruction residual is maximized and the within-class reconstruction residual is minimized. Furthermore, to achieve a minimum overall loss by performing recognition in the learned low-dimensional subspace, we introduce cost information into the dimensionality reduction method. The solutions for the proposed method can be efficiently found based on trace ratio optimization method [33]. Extensive experimental results demonstrate the superiority of the proposed algorithm when compared with the state-of-the-art methods.

  6. Use of structured decision-making to explicitly incorporate environmental process understanding in management of coastal restoration projects: Case study on barrier islands of the northern Gulf of Mexico.

    Dalyander, P Soupy; Meyers, Michelle; Mattsson, Brady; Steyer, Gregory; Godsey, Elizabeth; McDonald, Justin; Byrnes, Mark; Ford, Mark

    2016-12-01

    Coastal ecosystem management typically relies on subjective interpretation of scientific understanding, with limited methods for explicitly incorporating process knowledge into decisions that must meet multiple, potentially competing stakeholder objectives. Conversely, the scientific community lacks methods for identifying which advancements in system understanding would have the highest value to decision-makers. A case in point is barrier island restoration, where decision-makers lack tools to objectively use system understanding to determine how to optimally use limited contingency funds when project construction in this dynamic environment does not proceed as expected. In this study, collaborative structured decision-making (SDM) was evaluated as an approach to incorporate process understanding into mid-construction decisions and to identify priority gaps in knowledge from a management perspective. The focus was a barrier island restoration project at Ship Island, Mississippi, where sand will be used to close an extensive breach that currently divides the island. SDM was used to estimate damage that may occur during construction, and guide repair decisions within the confines of limited availability of sand and funding to minimize adverse impacts to project objectives. Sand was identified as more limiting than funds, and unrepaired major breaching would negatively impact objectives. Repairing minor damage immediately was determined to be generally more cost effective (depending on the longshore extent) than risking more damage to a weakened project. Key gaps in process-understanding relative to project management were identified as the relationship of island width to breach formation; the amounts of sand lost during breaching, lowering, or narrowing of the berm; the potential for minor breaches to self-heal versus developing into a major breach; and the relationship between upstream nourishment and resiliency of the berm to storms. This application is a

  7. Use of structured decision-making to explicitly incorporate environmental process understanding in management of coastal restoration projects: Case study on barrier islands of the northern Gulf of Mexico

    Dalyander, P. Soupy; Meyers, Michelle B.; Mattsson, Brady; Steyer, Gregory; Godsey, Elizabeth; McDonald, Justin; Byrnes, Mark R.; Ford, Mark

    2016-01-01

    Coastal ecosystem management typically relies on subjective interpretation of scientific understanding, with limited methods for explicitly incorporating process knowledge into decisions that must meet multiple, potentially competing stakeholder objectives. Conversely, the scientific community lacks methods for identifying which advancements in system understanding would have the highest value to decision-makers. A case in point is barrier island restoration, where decision-makers lack tools to objectively use system understanding to determine how to optimally use limited contingency funds when project construction in this dynamic environment does not proceed as expected. In this study, collaborative structured decision-making (SDM) was evaluated as an approach to incorporate process understanding into mid-construction decisions and to identify priority gaps in knowledge from a management perspective. The focus was a barrier island restoration project at Ship Island, Mississippi, where sand will be used to close an extensive breach that currently divides the island. SDM was used to estimate damage that may occur during construction, and guide repair decisions within the confines of limited availability of sand and funding to minimize adverse impacts to project objectives. Sand was identified as more limiting than funds, and unrepaired major breaching would negatively impact objectives. Repairing minor damage immediately was determined to be generally more cost effective (depending on the longshore extent) than risking more damage to a weakened project. Key gaps in process-understanding relative to project management were identified as the relationship of island width to breach formation; the amounts of sand lost during breaching, lowering, or narrowing of the berm; the potential for minor breaches to self-heal versus developing into a major breach; and the relationship between upstream nourishment and resiliency of the berm to storms. This application is a

  8. Managing aquatic ecosystems and water resources under multiple stress--an introduction to the MARS project.

    Hering, Daniel; Carvalho, Laurence; Argillier, Christine; Beklioglu, Meryem; Borja, Angel; Cardoso, Ana Cristina; Duel, Harm; Ferreira, Teresa; Globevnik, Lidija; Hanganu, Jenica; Hellsten, Seppo; Jeppesen, Erik; Kodeš, Vit; Solheim, Anne Lyche; Nõges, Tiina; Ormerod, Steve; Panagopoulos, Yiannis; Schmutz, Stefan; Venohr, Markus; Birk, Sebastian

    2015-01-15

    Water resources globally are affected by a complex mixture of stressors resulting from a range of drivers, including urban and agricultural land use, hydropower generation and climate change. Understanding how stressors interfere and impact upon ecological status and ecosystem services is essential for developing effective River Basin Management Plans and shaping future environmental policy. This paper details the nature of these problems for Europe's water resources and the need to find solutions at a range of spatial scales. In terms of the latter, we describe the aims and approaches of the EU-funded project MARS (Managing Aquatic ecosystems and water Resources under multiple Stress) and the conceptual and analytical framework that it is adopting to provide this knowledge, understanding and tools needed to address multiple stressors. MARS is operating at three scales: At the water body scale, the mechanistic understanding of stressor interactions and their impact upon water resources, ecological status and ecosystem services will be examined through multi-factorial experiments and the analysis of long time-series. At the river basin scale, modelling and empirical approaches will be adopted to characterise relationships between multiple stressors and ecological responses, functions, services and water resources. The effects of future land use and mitigation scenarios in 16 European river basins will be assessed. At the European scale, large-scale spatial analysis will be carried out to identify the relationships amongst stress intensity, ecological status and service provision, with a special focus on large transboundary rivers, lakes and fish. The project will support managers and policy makers in the practical implementation of the Water Framework Directive (WFD), of related legislation and of the Blueprint to Safeguard Europe's Water Resources by advising the 3rd River Basin Management Planning cycle, the revision of the WFD and by developing new tools for

  9. Observational constraints on the physical nature of submillimetre source multiplicity: chance projections are common

    Hayward, Christopher C.; Chapman, Scott C.; Steidel, Charles C.; Golob, Anneya; Casey, Caitlin M.; Smith, Daniel J. B.; Zitrin, Adi; Blain, Andrew W.; Bremer, Malcolm N.; Chen, Chian-Chou; Coppin, Kristen E. K.; Farrah, Duncan; Ibar, Eduardo; Michałowski, Michał J.; Sawicki, Marcin; Scott, Douglas; van der Werf, Paul; Fazio, Giovanni G.; Geach, James E.; Gurwell, Mark; Petitpas, Glen; Wilner, David J.

    2018-05-01

    Interferometric observations have demonstrated that a significant fraction of single-dish submillimetre (submm) sources are blends of multiple submm galaxies (SMGs), but the nature of this multiplicity, i.e. whether the galaxies are physically associated or chance projections, has not been determined. We performed spectroscopy of 11 SMGs in six multicomponent submm sources, obtaining spectroscopic redshifts for nine of them. For an additional two component SMGs, we detected continuum emission but no obvious features. We supplement our observed sources with four single-dish submm sources from the literature. This sample allows us to statistically constrain the physical nature of single-dish submm source multiplicity for the first time. In three (3/7, { or} 43^{+39 }_{ -33} {per cent at 95 {per cent} confidence}) of the single-dish sources for which the nature of the blending is unambiguous, the components for which spectroscopic redshifts are available are physically associated, whereas 4/7 (57^{+33 }_{ -39} per cent) have at least one unassociated component. When components whose spectra exhibit continuum but no features and for which the photometric redshift is significantly different from the spectroscopic redshift of the other component are also considered, 6/9 (67^{+26 }_{ -37} per cent) of the single-dish sources are comprised of at least one unassociated component SMG. The nature of the multiplicity of one single-dish source is ambiguous. We conclude that physically associated systems and chance projections both contribute to the multicomponent single-dish submm source population. This result contradicts the conventional wisdom that bright submm sources are solely a result of merger-induced starbursts, as blending of unassociated galaxies is also important.

  10. Project conservation and handling for the multiple uses and the development of the swamps of Colombia

    Sanchez Paez, Heliodoro

    1998-01-01

    In Colombia the swamps are distributed in the Atlantic and Pacific coasts; they are located in areas with conditions of pluvial precipitation that varies from annual 200 mm in the Guajira department; nine species of mangroves have registered for Colombia, which are related following a zonation starting from the tide line, still when this pattern not always stays and it depends on the influence of diverse factors and local conditions. The project conservation and handling for the multiple use and the development of the swamps of Colombia, had as objectives; to watch and to control the parameters of salinity, level of water and flow to laminate and of strengthening the generation of alternative productive social and environmentally appropriate for the sustainable use, guaranteeing their conservation and preservation of the swamps. The project was developed in two phases, one of diagnostic and planning and the other of dynamics of growth, phenology and natural regeneration

  11. Multiple R&D projects scheduling optimization with improved particle swarm algorithm.

    Liu, Mengqi; Shan, Miyuan; Wu, Juan

    2014-01-01

    For most enterprises, in order to win the initiative in the fierce competition of market, a key step is to improve their R&D ability to meet the various demands of customers more timely and less costly. This paper discusses the features of multiple R&D environments in large make-to-order enterprises under constrained human resource and budget, and puts forward a multi-project scheduling model during a certain period. Furthermore, we make some improvements to existed particle swarm algorithm and apply the one developed here to the resource-constrained multi-project scheduling model for a simulation experiment. Simultaneously, the feasibility of model and the validity of algorithm are proved in the experiment.

  12. A multiple sampling time projection ionization chamber for nuclear fragment tracking and charge measurement

    Bauer, G.; Bieser, F.; Brady, F.P.; Chance, J.C.; Christie, W.F.; Gilkes, M.; Lindenstruth, V.; Lynen, U.; Mueller, W.F.J.; Romero, J.L.; Sann, H.; Tull, C.E.; Warren, P.

    1997-01-01

    A detector has been developed for the tracking and charge measurement of the projectile fragment nuclei produced in relativistic nuclear collisions. This device, MUSIC II, is a second generation Multiple Sampling Ionization Chamber (MUSIC), and employs the principles of ionization and time projection chambers. It provides unique charge determination for charges Z≥6, and excellent track position measurement. MUSIC II has been used most recently with the EOS (equation of state) TPC and other EOS collaboration detectors. Earlier it was used with other systems in experiments at the Heavy Ion Superconducting Spectrometer (HISS) facility at Lawrence Berkeley Laboratory and the ALADIN spectrometer at GSI. (orig.)

  13. Site Restoration

    Noynaert, L.; Bruggeman, A.; Cornelissen, R.; Massaut, V.; Rahier, A

    2002-04-01

    The objectives, the programme, and the achievements of SCK-CEN's Site Restoration Department for 2001 are described. Main activities include the decommissioning of the BR3 PWR-reactor as well as other clean-up activities, projects on waste minimisation and the management of spent fuel and the flow of dismantled materials and the recycling of materials from decommissioning activities based on the smelting of metallic materials in specialised foundries. The department provides consultancy and services to external organisations and performs R and D on new techniques including processes for the treatment of various waste components including the reprocessing of spent fuel, the treatment of tritium, the treatment of liquid alkali metals into cabonates through oxidation, the treatment of radioactive organic waste and the reconditioning of bituminised waste products.

  14. Climate change and watershed mercury export: a multiple projection and model analysis.

    Golden, Heather E; Knightes, Christopher D; Conrads, Paul A; Feaster, Toby D; Davis, Gary M; Benedict, Stephen T; Bradley, Paul M

    2013-09-01

    Future shifts in climatic conditions may impact watershed mercury (Hg) dynamics and transport. An ensemble of watershed models was applied in the present study to simulate and evaluate the responses of hydrological and total Hg (THg) fluxes from the landscape to the watershed outlet and in-stream THg concentrations to contrasting climate change projections for a watershed in the southeastern coastal plain of the United States. Simulations were conducted under stationary atmospheric deposition and land cover conditions to explicitly evaluate the effect of projected precipitation and temperature on watershed Hg export (i.e., the flux of Hg at the watershed outlet). Based on downscaled inputs from 2 global circulation models that capture extremes of projected wet (Community Climate System Model, Ver 3 [CCSM3]) and dry (ECHAM4/HOPE-G [ECHO]) conditions for this region, watershed model simulation results suggest a decrease of approximately 19% in ensemble-averaged mean annual watershed THg fluxes using the ECHO climate-change model and an increase of approximately 5% in THg fluxes with the CCSM3 model. Ensemble-averaged mean annual ECHO in-stream THg concentrations increased 20%, while those of CCSM3 decreased by 9% between the baseline and projected simulation periods. Watershed model simulation results using both climate change models suggest that monthly watershed THg fluxes increase during the summer, when projected flow is higher than baseline conditions. The present study's multiple watershed model approach underscores the uncertainty associated with climate change response projections and their use in climate change management decisions. Thus, single-model predictions can be misleading, particularly in developmental stages of watershed Hg modeling. Copyright © 2013 SETAC.

  15. Climate change and watershed mercury export: a multiple projection and model analysis

    Golden, Heather E.; Knightes, Christopher D.; Conrads, Paul; Feaster, Toby D.; Davis, Gary M.; Benedict, Stephen T.; Bradley, Paul M.

    2013-01-01

    Future shifts in climatic conditions may impact watershed mercury (Hg) dynamics and transport. An ensemble of watershed models was applied in the present study to simulate and evaluate the responses of hydrological and total Hg (THg) fluxes from the landscape to the watershed outlet and in-stream THg concentrations to contrasting climate change projections for a watershed in the southeastern coastal plain of the United States. Simulations were conducted under stationary atmospheric deposition and land cover conditions to explicitly evaluate the effect of projected precipitation and temperature on watershed Hg export (i.e., the flux of Hg at the watershed outlet). Based on downscaled inputs from 2 global circulation models that capture extremes of projected wet (Community Climate System Model, Ver 3 [CCSM3]) and dry (ECHAM4/HOPE-G [ECHO]) conditions for this region, watershed model simulation results suggest a decrease of approximately 19% in ensemble-averaged mean annual watershed THg fluxes using the ECHO climate-change model and an increase of approximately 5% in THg fluxes with the CCSM3 model. Ensemble-averaged mean annual ECHO in-stream THg concentrations increased 20%, while those of CCSM3 decreased by 9% between the baseline and projected simulation periods. Watershed model simulation results using both climate change models suggest that monthly watershed THg fluxes increase during the summer, when projected flow is higher than baseline conditions. The present study's multiple watershed model approach underscores the uncertainty associated with climate change response projections and their use in climate change management decisions. Thus, single-model predictions can be misleading, particularly in developmental stages of watershed Hg modeling.

  16. CRITICAL RADAR: TOOL AND METHODOLOGY FOR EVALUATING CURRENT PROJECTS USING MULTIPLE VARIABLES

    André M. Ferrari

    2017-06-01

    Full Text Available Many resources are invested in measurement processes of projects indicators without, however, give a clear view of which projects deserves the right attention at the right time. This paper proposes the use of statistics, through the analysis of multiple variables and their interrelationships, to give better basis to a critical assessment methodology of current projects used in a multinational mining company. The contribution of the research is to report the methodology called Critical Radar which is based on a graphical tool with simple operationalization that can support the decision making in complex environments, and has great flexibility across the different market scenarios and possible changes in companies guidelines. The tool has great potential to help evaluate current projects due to their characteristics of flexible use in different business areas; high degree of freedom for improvement; use of known market tool in its development; ease of viewing the results through charts and notes and user freedom to use any existing indicators in the company if complied with some statistical data quality characteristics.

  17. A case study of resources management planning with multiple objectives and projects

    Peterson, David L.; Silsbee, David G.; Schmoldt, Daniel L.

    1994-09-01

    Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decision-making tools. We have previously described a multiple objective planning process for inventory and monitoring programs (Schmoldt and others 1994). To test the applicability of that process for the more general needs of resources management planning, we conducted an exercise on the Olympic National Park (NP) in Washington State, USA. Eight projects were selected as typical of those considered in RMPs and five members of the Olympic NP staff used the analytic hierarchy process (AHP) to prioritize the eight projects with respect to their implicit management objectives. By altering management priorities for the park, three scenarios were generated. All three contained some similarities in rankings for the eight projects, as well as some differences. Mathematical allocations of money and people differed among these scenarios and differed substantially from what the actual 1990 Olympic NP RMP contains. Combining subjective priority measures with budget dollars and personnel time into an objective function creates a subjective economic metric for comparing different RMP’s. By applying this planning procedure, actual expenditures of budget and personnel in Olympic NP can agree more closely with the staff’s management objectives for the park.

  18. Ecological Restoration: Guidance from Theory

    Joy Zedler

    2005-09-01

    Full Text Available A review of the science and practice of ecosystem restoration led me to identify key ecological theories and concepts that are relevant to planning, implementing, and sustaining restoration efforts. From experience with actual restoration projects, I provide guidance for improving the restoration process. Despite an abundance of theory and guidance, restoration goals are not always achieved, and pathways toward targets are not highly predictable. This is understandable, since each restoration project has many constraints and unique challenges. To improve restoration progress, I advise that sites be designed as experiments to allow learning while doing. At least the larger projects can be restored in phases, each designed as experimental treatments to test alternative restoration approaches. Subsequent phases can then adopt one or more of the treatments that best achieved goals in earlier phases while applying new tests of other restoration measures. Both science and restoration can progress simultaneously. This phased, experimental approach (called “adaptive restoration” is an effective tool for improving restoration when monitoring, assessment, interpretation and research are integrated into the process.

  19. An archaeological reconnaissance of a 14 mile section of the East Fork Poplar Creek for the Environmental Restoration Project, Anderson and Roane Counties, Tennessee

    DuVall, G.D.

    1993-01-01

    At the request of the US Army Corps of Engineers, Nashville District, Nashville, Tennessee, an archaeological reconnaissance of the potential impact areas of the Environmental Restoration Project (ERP) along the East Fork Poplar Creek was conducted during the period December 16, 1991, and March 3, 1992. The reconnaissance was conducted in response to environmental evaluations as a result of the accidental spillage of approximately 293,000 pounds of mercury, radionuclides, heavy metals and other compounds. The reconnaissance to assess adverse impacts to cultural resources located within the boundaries of Federally-licensed, permitted, funded or assisted projects was conducted in compliance with the National Historic Preservation Act of 1966, National Environmental Policy Act of 1969 and Executive Order 11593

  20. The STAR Photon Multiplicity Detector

    Aggarwal, M.M.; Badyal, S.K.; Bhaskar, P.; Bhatia, V.S.; Chattopadhyay, S. E-mail: sub@veccal.ernet.in; Das, S.; Datta, R.; Dubey, A.K.; Dutta Majumdar, M.R.; Ganti, M.S.; Ghosh, P.; Gupta, A.; Gupta, M.; Gupta, R.; Kaur, I.; Kumar, A.; Mahajan, S.; Mahapatra, D.P.; Mangotra, L.K.; Mishra, D.; Mohanty, B.; Nayak, S.K.; Nayak, T.K.; Pal, S.K.; Phatak, S.C.; Potukuchi, B.V.K.S.; Raniwala, R.; Raniwala, S.; Sahoo, R.; Sharma, A.; Singaraju, R.N.; Sood, G.; Trivedi, M.D.; Varma, R.; Viyogi, Y.P

    2003-03-01

    Details concerning the design, fabrication and performance of STAR Photon Multiplicity Detector (PMD) are presented. The PMD will cover the forward region, within the pseudorapidity range 2.3-3.5, behind the forward time projection chamber. It will measure the spatial distribution of photons in order to study collective flow, fluctuation and chiral symmetry restoration.

  1. Combining information from multiple flood projections in a hierarchical Bayesian framework

    Le Vine, Nataliya

    2016-04-01

    This study demonstrates, in the context of flood frequency analysis, the potential of a recently proposed hierarchical Bayesian approach to combine information from multiple models. The approach explicitly accommodates shared multimodel discrepancy as well as the probabilistic nature of the flood estimates, and treats the available models as a sample from a hypothetical complete (but unobserved) set of models. The methodology is applied to flood estimates from multiple hydrological projections (the Future Flows Hydrology data set) for 135 catchments in the UK. The advantages of the approach are shown to be: (1) to ensure adequate "baseline" with which to compare future changes; (2) to reduce flood estimate uncertainty; (3) to maximize use of statistical information in circumstances where multiple weak predictions individually lack power, but collectively provide meaningful information; (4) to diminish the importance of model consistency when model biases are large; and (5) to explicitly consider the influence of the (model performance) stationarity assumption. Moreover, the analysis indicates that reducing shared model discrepancy is the key to further reduction of uncertainty in the flood frequency analysis. The findings are of value regarding how conclusions about changing exposure to flooding are drawn, and to flood frequency change attribution studies.

  2. Challenges of ecological restoration

    Halme, Panu; Allen, Katherine A.; Aunins, Ainars

    2013-01-01

    we introduce northern forests as an ecosystem, discuss the historical and recent human impact and provide a brief status report on the ecological restoration projects and research already conducted there. Based on this discussion, we argue that before any restoration actions commence, the ecology......The alarming rate of ecosystem degradation has raised the need for ecological restoration throughout different biomes and continents. North European forests may appear as one of the least vulnerable ecosystems from a global perspective, since forest cover is not rapidly decreasing and many...... on Biological Diversity. Several northern countries are now taking up this challenge by restoring forest biodiversity with increasing intensity. The ecology and biodiversity of boreal forests are relatively well understood making them a good model for restoration activities in many other forest ecosystems. Here...

  3. Assessment and restoring soil functionality in degraded areas of organic vineyards. The preliminary results of the ReSolVe project in Italy

    Priori, Simone; Agnelli, Alessandro; Castaldini, Maurizio; D'Avino, Lorenzo; D'Errico, Giada; Gagnarli, Elena; Giudi, Silvia; Goggioli, Donatella; Lagomarsino, Alessandra; Landi, Silvia; Leprini, Marco; Pellegrini, Sergio; Perria, Rita; Puccioni, Sergio; Simoni, Sauro; Storchi, Paolo; Valboa, Giuseppe; Zombardo, Alessandra; Costantini, Edoardo

    2016-04-01

    In both conventional and organic Italian vineyards, it is quite common to have areas characterized by problems in vine health, grape production and quality, often caused by improper land preparation before vine plantation and/or management. Causes for soil malfunctioning can include: reduced contribution of the soil fauna to the ecosystem services (i.e. nutrient cycles), poor organic matter content, imbalance of some element ratio, altered pH, water deficiency, soil compaction and/or scarce oxygenation. ReSolVe is a transnational and interdisciplinary 3-years research project aimed at testing the effects of selected organic strategies for restoring optimal soil functionality in degraded areas within vineyard. The different restoring strategies implemented in each plot will be: i) compost produced on farm by manure + pruning residue + grass, ii) faba bean and barley green manure, iii) sowing and dry mulching with Trifolium squarrosum L. During two years of such treatments, the trend of the soil features and the grapevine status will be monitored in detail, to reveal the positive and negative effects of such treatments. The project involves 8 research groups in 6 different EU countries (Italy, France, Spain, Sweden, Slovenia, and Turkey), with experts from several disciplines, including soil science, ecology, microbiology, grapevine physiology, viticulture, and biometry. The experimental vineyards are situated in Italy (Chianti hills and Maremma plain, Tuscany), France (Bordeaux and Languedoc), Spain (La Rioja) and Slovenia (Primorska) for winegrape, and in Turkey (Adana and Mersin) for table grape. Soil features before implementing restoring strategies showed lower content of soil organic matter and enzyme activities, and higher carbonates in degraded areas than in the non-degraded areas. The Biological Soil Quality values of microarthropods were always high, in comparison with data registered in similarly managed vineyards or stable ecosystems, and the data showed

  4. Supplement analysis for the proposed upgrades to the tank farm ventilation, instrumentation, and electrical systems under Project W-314 in support of tank farm restoration and safe operations

    1997-05-01

    The mission of the TWRS program is to store, treat, and immobilize highly radioactive tank waste in an environmentally sound, safe, and cost-effective manner. Within this program, Project W-314, Tank Farm Restoration and Safe Operations, has been established to provide upgrades in the areas of instrumentation and control, tank ventilation, waste transfer, and electrical distribution for existing tank farm facilities. Requirements for tank farm infrastructure upgrades to support safe storage were being developed under Project W-314 at the same time that the TWRS EIS alternative analysis was being performed. Project W-314 provides essential tank farm infrastructure upgrades to support continued safe storage of existing tank wastes until the wastes can be retrieved and disposed of through follow-on TWRS program efforts. Section4.0 provides a description of actions associated with Project W-314. The TWRS EIS analyzes the environmental consequences form the entire TWRS program, including actions similar to those described for Project W-314 as a part of continued tank farm operations. The TWRS EIS preferred alternative was developed to a conceptual level of detail to assess bounding impact areas. For this Supplement Analysis, in each of the potential impact areas for Project W-314, the proposed action was evaluated and compared to the TWRS EIS evaluation of the preferred alternative (Section 5.0). Qualitative and/or quantitative comparisons are then provided in this Supplement Analysis to support a determination on the need for additional National Environmental Policy Act (NEPA) analysis. Based on this Supplement Analysis, the potential impacts for Project W-314 would be small in comparison to and are bounded by the impacts assessed for the TWRS EIS preferred alternative, and therefore no additional NEPA analysis is required (Section 7.0)

  5. HBIM for restoration projects: case-study on San Cipriano Church in Castelvecchio Calvisio, Province of L’Aquila, Italy.

    Romolo Continenza

    2016-06-01

    Full Text Available Although there have been significant developments in research into assigning semantic content to 3D models for the purposes of documentation, conservation and architectural and archaeological heritage management, the application of 3D GIS to individual artifacts has remained rare. Where 3D GIS has been used in this context, it has not been done in a consistent or standardised way.As an alternative to the elaborate construction of 3D GIS, the international academic community has embarked on a process of investigating how HBIM (Historical BIM might be used in the fields of historical architecture and archaeology.In this paper, we report on experiments carried out at the San Cipriano Church in Castelvecchio Calvisio, Province of L’Aquila, Italy, on the basis of the integrated survey of the church, before turning to a discussion of the planning of restoration work in a BIM environment.

  6. Alpha-risk: a European project on the quantification of risks associated with multiple radiation exposures

    Laurier, D.; Monchaux, G.; Tirmarche, M.; Darby, S.; Cardis, E.; Binks, K.; Hofmann, W.; Muirhead, C.

    2006-01-01

    The Alpha-Risk research project is being conducted within the Sixth European Framework Programme (EC-FP6, 2005 -2008). It aims to improve the quantification of risks associated with multiple exposures, taking into account the contribution of different radionuclides and external exposure using specific organ dose calculations. The Alpha-Risk Consortium involves 18 partners from 9 countries, and is coordinated by the IRSN. Its composition allows a multidisciplinary collaboration between researchers in epidemiology, dosimetry, statistics, modelling and risk assessment. Alpha-Risk brings together major epidemiological studies in Europe, which are able to evaluate long-term health effects of internal exposure from radionuclides. It includes large size cohort and case-control studies, with accurate registration of individual annual exposures: uranium miner studies, studies on lung cancer and indoor radon exposure, and studies of lung cancer and leukaemia among nuclear workers exposed to transuranic nuclides (mainly uranium and plutonium), for whom organ doses will be reconstructed individually. The contribution of experts in dosimetry will allow the calculation of organ doses in presence of multiple exposures (radon decay products, uranium dust and external gamma exposure). Expression of the risk per unit organ dose will make it possible to compare results with those from other populations exposed to external radiation. The multidisciplinary approach of Alpha-Risk promotes the development of coherent and improved methodological approaches regarding risk modelling. A specific work - package is dedicated to the integration of results and their use for risk assessment, especially for radon. Alpha-Risk will contribute to a better understanding of long-term health risks following chronic low doses from internal exposures. The project also has the great potential to help resolve major public health concerns about the effects of low and/or protracted exposures, especially

  7. Monitoring habitat restoration projects: U.S. Fish and Wildlife Service Pacific Region Partners for Fish and Wildlife Program and Coastal Program Protocol

    Woodward, Andrea; Hollar, Kathy

    2011-01-01

    Refuges, Contribute to the implementation of the State Comprehensive Wildlife Conservation Strategies, and Help achieve the objectives of the National Fish Habitat Partnerships and regionally based bird conservation plans (for example, North American Waterfowl Management Plan, U.S. Pacific Island Shorebird Conservation Plans, Intermountain West Regional Shorebird Plan, etc.). The Partners Program accomplishes these priorities by: Developing and maintaining strong partnerships, and delivering on-the-ground habitat restoration projects designed to reestablish habitat function and restore natural processes; Addressing key habitat limiting factors for declining species; Providing corridors for wildlife and decrease impediments to native fish and wildlife migration; and Enhancing native plant communities by reducing invasive species and improving native species composition. The Coastal Program is a voluntary fish and wildlife conservation program that focuses on watershed-scale, long-term collaborative resource planning and on-the-ground restoration projects in high-priority coastal areas. The Coastal Program conducts planning and restoration work on private, State, and Federal lands, and partnerships with other agencies-Native American Tribes, citizens, and organizations are emphasized. Coastal Program goals include restoring and protecting coastal habitat, providing technical and cost-sharing assistance where appropriate, supporting community-based restoration, collecting and developing information on the status of and threats to fish and wildlife, and using outreach to promote stewardship of coastal resources. The diversity of habitats and partners in Region 1 present many opportunities for conducting restoration projects. Faced with this abundance of opportunity, the Partners Program and Coastal Program must ensure that limited staffing and project dollars are allocated to benefit the highest priority resources and achieve the highest quality results for Federal trust

  8. Comparison of additive (absolute) risk projection models and multiplicative (relative) risk projection models in estimating radiation-induced lifetime cancer risk

    Kai, Michiaki; Kusama, Tomoko

    1990-01-01

    Lifetime cancer risk estimates depend on risk projection models. While the increasing lengths of follow-up observation periods of atomic bomb survivors in Hiroshima and Nagasaki bring about changes in cancer risk estimates, the validity of the two risk projection models, the additive risk projection model (AR) and multiplicative risk projection model (MR), comes into question. This paper compares the lifetime risk or loss of life-expectancy between the two projection models on the basis of BEIR-III report or recently published RERF report. With Japanese cancer statistics the estimates of MR were greater than those of AR, but a reversal of these results was seen when the cancer hazard function for India was used. When we investigated the validity of the two projection models using epidemiological human data and animal data, the results suggested that MR was superior to AR with respect to temporal change, but there was little evidence to support its validity. (author)

  9. Managing the effects of multiple stressors on aquatic ecosystems under water scarcity. The GLOBAQUA project.

    Navarro-Ortega, Alícia; Acuña, Vicenç; Bellin, Alberto; Burek, Peter; Cassiani, Giorgio; Choukr-Allah, Redouane; Dolédec, Sylvain; Elosegi, Arturo; Ferrari, Federico; Ginebreda, Antoni; Grathwohl, Peter; Jones, Colin; Rault, Philippe Ker; Kok, Kasper; Koundouri, Phoebe; Ludwig, Ralf Peter; Merz, Ralf; Milacic, Radmila; Muñoz, Isabel; Nikulin, Grigory; Paniconi, Claudio; Paunović, Momir; Petrovic, Mira; Sabater, Laia; Sabaterb, Sergi; Skoulikidis, Nikolaos Th; Slob, Adriaan; Teutsch, Georg; Voulvoulis, Nikolaos; Barceló, Damià

    2015-01-15

    Water scarcity is a serious environmental problem in many European regions, and will likely increase in the near future as a consequence of increased abstraction and climate change. Water scarcity exacerbates the effects of multiple stressors, and thus results in decreased water quality. It impacts river ecosystems, threatens the services they provide, and it will force managers and policy-makers to change their current practices. The EU-FP7 project GLOBAQUA aims at identifying the prevalence, interaction and linkages between stressors, and to assess their effects on the chemical and ecological status of freshwater ecosystems in order to improve water management practice and policies. GLOBAQUA assembles a multidisciplinary team of 21 European plus 2 non-European scientific institutions, as well as water authorities and river basin managers. The project includes experts in hydrology, chemistry, biology, geomorphology, modelling, socio-economics, governance science, knowledge brokerage, and policy advocacy. GLOBAQUA studies six river basins (Ebro, Adige, Sava, Evrotas, Anglian and Souss Massa) affected by water scarcity, and aims to answer the following questions: how does water scarcity interact with other existing stressors in the study river basins? How will these interactions change according to the different scenarios of future global change? Which will be the foreseeable consequences for river ecosystems? How will these in turn affect the services the ecosystems provide? How should management and policies be adapted to minimise the ecological, economic and societal consequences? These questions will be approached by combining data-mining, field- and laboratory-based research, and modelling. Here, we outline the general structure of the project and the activities to be conducted within the fourteen work-packages of GLOBAQUA. Copyright © 2014. Published by Elsevier B.V.

  10. Managing the effects of multiple stressors on aquatic ecosystems under water scarcity. The GLOBAQUA project

    Navarro-Ortega, Alícia; Acuña, Vicenç; Bellin, Alberto; Burek, Peter; Cassiani, Giorgio; Choukr-Allah, Redouane; Dolédec, Sylvain; Elosegi, Arturo; Ferrari, Federico; Ginebreda, Antoni; Grathwohl, Peter; Jones, Colin; Rault, Philippe Ker; Kok, Kasper; Koundouri, Phoebe; Ludwig, Ralf Peter; Merz, Ralf; Milacic, Radmila; Muñoz, Isabel; Nikulin, Grigory; Paniconi, Claudio; Paunović, Momir; Petrovic, Mira; Sabater, Laia; Sabaterb, Sergi; Skoulikidis, Nikolaos Th.; Slob, Adriaan; Teutsch, Georg; Voulvoulis, Nikolaos; Barceló, Damià

    2015-01-01

    Water scarcity is a serious environmental problem in many European regions, and will likely increase in the near future as a consequence of increased abstraction and climate change. Water scarcity exacerbates the effects of multiple stressors, and thus results in decreased water quality. It impacts river ecosystems, threatens the services they provide, and it will force managers and policy-makers to change their current practices. The EU-FP7 project GLOBAQUA aims at identifying the prevalence, interaction and linkages between stressors, and to assess their effects on the chemical and ecological status of freshwater ecosystems in order to improve water management practice and policies. GLOBAQUA assembles a multidisciplinary team of 21 European plus 2 non-European scientific institutions, as well as water authorities and river basin managers. The project includes experts in hydrology, chemistry, biology, geomorphology, modelling, socio-economics, governance science, knowledge brokerage, and policy advocacy. GLOBAQUA studies six river basins (Ebro, Adige, Sava, Evrotas, Anglian and Souss Massa) affected by water scarcity, and aims to answer the following questions: how does water scarcity interact with other existing stressors in the study river basins? How will these interactions change according to the different scenarios of future global change? Which will be the foreseeable consequences for river ecosystems? How will these in turn affect the services the ecosystems provide? How should management and policies be adapted to minimise the ecological, economic and societal consequences? These questions will be approached by combining data-mining, field- and laboratory-based research, and modelling. Here, we outline the general structure of the project and the activities to be conducted within the fourteen work-packages of GLOBAQUA. PMID:25005236

  11. Environmental restoration of uranium contaminated sites in Estonia within the framework of IAEA project (RER/9/022) in 1995-1996

    Ratas, R.

    1997-01-01

    In Estonia there are several radioactively contaminated sites left from the military and uranium progressing activities by the former Soviet Union. Enhanced radiation levels are prevalent in the Paldiski area, a former nuclear submarine training centre; on the territory of the waste depository at Saku/Tammiku and at Sillamae, where a large depository of uranium milling tailings is situated. During the last two years considerable effort has been put into restoration of these sites. To start with, designing of reasonably achievable remediation projects have been taken up. Estonia has received large contributions from many western countries and organisations. Practical remediation work on contaminated areas, e.g. at Sillamae is, however, delayed due to lack of funds. (author)

  12. Project CAPTURE: a U.S. national prioritization assessment of tree species for conservation, management, and restoration

    Kevin M. Potter; Barbara S. Crane; Valerie D. Hipkins

    2017-01-01

    that forest tree species will undergo population-level extirpation or species-level extinction during the next century. Project CAPTURE (Conservation Assessment and Prioritization of Forest Trees Under Risk of Extirpation) is a cooperative effort across the three U.S. Department of Agriculture Forest Service (USDA FS) deputy areas to establish a framework for...

  13. Project CAPTURE: using forest inventory and analysis data to prioritize tree species for conservation, management, and restoration

    Kevin M. Potter; Barbara S. Crane; William W. Hargrove

    2015-01-01

    A variety of threats, most importantly climate change and insect and disease infestation, will increase the likelihood that forest tree species could experience population-level extirpation or species-level extinction during the next century. Project CAPTURE (Conservation Assessment and Prioritization of Forest Trees Under Risk of Extirpation) is a cooperative effort...

  14. Linking project-based production and project management temporary systems in multiple contexts : An introduction to the special edition

    Oerlemans, L.A.G.; Pretorius, M.W.

    2014-01-01

    As organisations in more and more industries look for flexible ways of production in the wake of rapidly changing market environments, project-based organising is becoming an increasingly important mode of organisation (Eisenhardt & Tabrizi, 1995). Whereas project-based organisation was

  15. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : 2002 Annual Report.

    Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

    2003-06-30

    The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day system is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day, who contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2002, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies

  16. Project-based production and project management: Findings and trends in research on temporary systems in multiple contexts

    Tinus Pretorius

    2014-02-01

    Full Text Available Globalisation is challenging almost every aspect of the political, economic, social and technological environment. Organisations, whether public or private, have to adapt their strategies and operations to stay competitive and efficient. Historically, organisations adopted project-based operations as a mode to stay competitive, although the applications tended to be the oneoff type of operations such as construction and system development projects (Edum-Fotwe & McCaffer, 2000. As the world changed from an industrially driven to a more knowledge driven economy and the pace of continuous change became more intense, organisations adopted a project-based mode of operations on a broader scale. The knowledge economy lead to the creation of many service orientated industries. Organisations started facing portfolios of projects where the nature of these projects differed in technological complexity, urgency, customer value and social impact (Gutjahr & Froeschl, 2013. Based on their experience with more technically orientated projects, organisations focused their attention more intensely on new project management methods, tools and processes and not necessarily on the human and organisational interfaces. This paradigm changed however, especially since the 1980s and more and more organisations adopted temporary organisational forms (Bakker, 2010 in order to improve their competitiveness. The contributions in this special edition of the South African Journal of Economic and Management Sciences have a common focus on the importance of the human and organisational interface of project-based operations on project success. The purpose of this concluding article is to analyse the findings and recommendations in these papers and to detect trends and future research opportunities in the field of project-based operations.

  17. Hydrological classification, a practical tool for mangrove restoration

    Loon, van Anne F.; Brake, te Bram; Huijgevoort, Van Marjolein H.J.; Dijksma, Roel

    2016-01-01

    Mangrove restoration projects, aimed at restoring important values of mangrove forests after degradation, often fail because hydrological conditions are disregarded. We present a simple, but robust methodology to determine hydrological suitability for mangrove species, which can guide restoration

  18. Opposition multiple objective symbiotic organisms search (OMOSOS for time, cost, quality and work continuity tradeoff in repetitive projects

    Duc-Hoc Tran

    2018-04-01

    Full Text Available Construction managers often face with projects containing multiple units wherein activities repeat from unit to unit. Therefore effective resource management is crucial in terms of project duration, cost and quality. Accordingly, researchers have developed several models to aid planners in developing practical and near-optimal schedules for repetitive projects. Despite their undeniable benefits, such models lack the ability of pure simultaneous optimization because existing methodologies optimize the schedule with respect to a single factor, to achieve minimum duration, total cost, resource work breaks or various combinations, respectively. This study introduces a novel approach called “opposition multiple objective symbiotic organisms search” (OMOSOS for scheduling repetitive projects. The proposed algorithm used an opposition-based learning technique for population initialization and for generation jumping. Further, this study integrated a scheduling module (M1 to determine all project objectives including time, cost, quality and interruption. The proposed algorithm was implemented on two application examples in order to demonstrate its capabilities in optimizing the scheduling of repetitive construction projects. The results indicate that the OMOSOS approach is a powerful optimization technique and can assist project managers in selecting appropriate plan for project. Keywords: Symbiotic organisms search, Multi-objective analysis, Resource tradeoff, Schedules, Repetitive

  19. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 415: Project 57 No. 1 Plutonium Dispersion (NTTR), Nevada, Revision 0

    Matthews, Patrick; Burmeister, Mark

    2014-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 415, Project 57 No. 1 Plutonium Dispersion (NTTR). CAU 415 is located on Range 4808A of the Nevada Test and Training Range (NTTR) and consists of one corrective action site: NAFR-23-02, Pu Contaminated Soil. The CAU 415 site consists of the atmospheric release of radiological contaminants to surface soil from the Project 57 safety experiment conducted in 1957. The safety experiment released plutonium (Pu), uranium (U), and americium (Am) to the surface soil over an area of approximately 1.9 square miles. This area is currently fenced and posted as a radiological contamination area. Vehicles and debris contaminated by the experiment were subsequently buried in a disposal trench within the surface-contaminated, fenced area and are assumed to have released radiological contamination to subsurface soils. Potential source materials in the form of pole-mounted electrical transformers were also identified at the site and will be removed as part of closure activities.

  20. Linking project-based production and project management temporary systems in multiple contexts: An introduction to the special edition

    Leon AG Oerlemans

    2014-02-01

    Full Text Available As organisations in more and more industries look for flexible ways of production in the wake of rapidly changing market environments, project-based organising is becoming an increasingly important mode of organisation (Eisenhardt & Tabrizi, 1995. Whereas project-based organisation was traditionally mainly the domain of industries such as film making (Sorenson & Waguespack, 2006, theatre (Goodman & Goodman, 1976, and construction (Gann & Salter, 2000, a project-based mode of operation has recently pervaded many other sectors in the economy, including software development, advertising, biotechnology, consulting, emergency response, fashion, television and complex products and systems (Grabher, 2004; Hobday, 2000. This increasing prevalence is reflected in an exponentially growing body of research (Bakker, 2010, which has made marked progress in areas such as project-based learning (Prencipe & Tell, 2001, project-based innovation (Eisenhardt & Tabrizi, 1995 and project-based careers (Jones, 1996. As a consequence, research on project organisation has moved from being a narrow specialty domain toward being a broad research paradigm, attending to a broad audience in organisation science and beyond (Sydow et al., 2004. In a fairly recent review paper, Bakker (2010 shows that in the period 1988–2008 scholarly attention, as indicated by publications in books and ISI-indexed journals, grew exponentially (see Figure 1. Comparing the number of publications in the period 1988-1998 with the period 1998–2008, he observed an increase of almost 340%.

  1. A consensus successive projections algorithm--multiple linear regression method for analyzing near infrared spectra.

    Liu, Ke; Chen, Xiaojing; Li, Limin; Chen, Huiling; Ruan, Xiukai; Liu, Wenbin

    2015-02-09

    The successive projections algorithm (SPA) is widely used to select variables for multiple linear regression (MLR) modeling. However, SPA used only once may not obtain all the useful information of the full spectra, because the number of selected variables cannot exceed the number of calibration samples in the SPA algorithm. Therefore, the SPA-MLR method risks the loss of useful information. To make a full use of the useful information in the spectra, a new method named "consensus SPA-MLR" (C-SPA-MLR) is proposed herein. This method is the combination of consensus strategy and SPA-MLR method. In the C-SPA-MLR method, SPA-MLR is used to construct member models with different subsets of variables, which are selected from the remaining variables iteratively. A consensus prediction is obtained by combining the predictions of the member models. The proposed method is evaluated by analyzing the near infrared (NIR) spectra of corn and diesel. The results of C-SPA-MLR method showed a better prediction performance compared with the SPA-MLR and full-spectra PLS methods. Moreover, these results could serve as a reference for combination the consensus strategy and other variable selection methods when analyzing NIR spectra and other spectroscopic techniques. Copyright © 2014 Elsevier B.V. All rights reserved.

  2. Hydrometric, Hydrochemical, and Hydrogeophysical Runoff Characterization Across Multiple Land Covers in the Agua Salud Project, Panama

    Litt, Guy Finley

    As the Panama Canal Authority faces sensitivity to water shortages, managing water resources becomes crucial for the global shipping industry's security. These studies address knowledge gaps in tropical water resources to aid hydrological model development and validation. Field-based hydrological investigations in the Agua Salud Project within the Panama Canal Watershed employed multiple tools across a variety of land covers to investigate hydrological processes. Geochemical tracers informed where storm runoff in a stream comes from and identified electrical conductivity (EC) as an economical, high sample frequency tracer during small storms. EC-based hydrograph separation coupled with hydrograph recession rate analyses identified shallow and deep groundwater storage-discharge relationships that varied by season and land cover. A series of plot-scale electrical resistivity imaging geophysical experiments coupled with rainfall simulation characterized subsurface flow pathway behavior and quantified respectively increasing infiltration rates across pasture, 10 year old secondary succession forest, teak (tectona grandis), and 30 year old secondary succession forest land covers. Additional soil water, groundwater, and geochemical studies informed conceptual model development in subsurface flow pathways and groundwater, and identified future research needs.

  3. EXTENDED CRITICAL SUCCESS FACTOR MODEL FOR MANAGEMENT OF MULTIPLE PROJECTS: AN EMPIRICAL VIEW FROM TRANSNET IN SOUTH AFRICA

    J.M. Nethathe

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: Transnet Freight Rail in South Africa has faced projects delays in its multi-project environment. This study takes South Africa as representative of developing countries, and develops the Critical Success Factors (CSFs model for multiple projects success, with the goal of expanding the conventional model by adding the demographic characteristics of the business units involved in the multiple projects. The empirical results showing the greatest number of success factors are people-related, with the focus on team selection and team commitment. Two demographic characteristics are of importance when managing multiple projects: the size of the business unit, and the employees’ project experience.

    AFRIKAANSE OPSOMMING: Transnet, ‘n spoorvragentiteit in Suid-Afrika, ondervind gereeld projekvertragings in hul multi-projekomgewing. Suid-Afrika, as ‘n voorbeeld van ontwikkelende lande, word in die studie gebruik en hierdie studie ontwikkel ‘n reeks suksesfaktore vir ‘n multi-projek-omgewing deur ‘n bestaande konvensionele model aan te pas om ook die demografiese eienskappe van die verskillende besigheidseenhede betrokke in die organisasie te inkorpo-reer. Die resultaat van die studie wys dat die grootste aantal suksesfaktore mens-geörienteerd is, met die fokus op die samestelling en toewyding van die betrokke projekspanne. Twee demografiese eienskape is belangrik by die bestuur van multi-projekte, naamlik die grootte van die besigheidseenheid asook projekondervinding van die werknemers.

  4. Pinellas County, Florida Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site June through November 2016 January 2017

    Survochak, Scott [USDOE Office of Legacy Management, Washington, DC (United States); Daniel, Joe [Navarrao Research and Engineering, Inc., Oak Ridge, TN (United States)

    2017-01-01

    This Pinellas County, Florida, Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site describes environmental restoration activities for the 4.5 Acre Site located in Pinellas County, Largo, Florida (Figure 1). The former U.S. Department of Energy (DOE) Pinellas Plant facility consisted of the 4.5 Acre Site and what is now the STAR Center (Young - Rainey Science, Technology, and Research Center). Both the 4.5 Acre Site and the STAR Center are part of the overall Pinellas County, Florida, Site (Figure 2). The 4.5 Acre Site is located immediately northwest of the STAR Center, in the northeast quarter of Section 13, Township 30 South, Range 15 East. DOE owned this parcel from 1957 to 1972, at which time it was sold to a private landowner. During the period of DOE ownership, the property was used for the disposal of drums of waste resins and solvents. As a result of this practice, the surficial aquifer was impacted by volatile organic compounds (VOCs)—trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), vinyl chloride (VC), and benzene. Detailed background information for the site is contained in the Long-Term Surveillance and Maintenance Plan for the Pinellas Site (DOE 2016). That document and other site-related documents can be accessed at this website: http://www.lm.doe.gov/Pinellas/Sites.aspx. Recent remediation activities consist of the injection of emulsified soybean oil and the microorganism Dehalococcoides mccartyi (formerly known as Dehalococcoides ethenogenes) into the subsurface in February 2010 and again in July 2013 to enhance contaminant biodegradation (hereafter described as bioinjection). Monitoring the performance of these actions, in the form of monitoring well sampling, is ongoing.

  5. Pinellas County, Florida Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site June through November 2016 January 2017

    Survochak, Scott; Daniel, Joe

    2017-01-01

    This Pinellas County, Florida, Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site describes environmental restoration activities for the 4.5 Acre Site located in Pinellas County, Largo, Florida (Figure 1). The former U.S. Department of Energy (DOE) Pinellas Plant facility consisted of the 4.5 Acre Site and what is now the STAR Center (Young - Rainey Science, Technology, and Research Center). Both the 4.5 Acre Site and the STAR Center are part of the overall Pinellas County, Florida, Site (Figure 2). The 4.5 Acre Site is located immediately northwest of the STAR Center, in the northeast quarter of Section 13, Township 30 South, Range 15 East. DOE owned this parcel from 1957 to 1972, at which time it was sold to a private landowner. During the period of DOE ownership, the property was used for the disposal of drums of waste resins and solvents. As a result of this practice, the surficial aquifer was impacted by volatile organic compounds (VOCs)-trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), vinyl chloride (VC), and benzene. Detailed background information for the site is contained in the Long-Term Surveillance and Maintenance Plan for the Pinellas Site (DOE 2016). That document and other site-related documents can be accessed at this website: http://www.lm.doe.gov/Pinellas/Sites.aspx. Recent remediation activities consist of the injection of emulsified soybean oil and the microorganism Dehalococcoides mccartyi (formerly known as Dehalococcoides ethenogenes) into the subsurface in February 2010 and again in July 2013 to enhance contaminant biodegradation (hereafter described as bioinjection). Monitoring the performance of these actions, in the form of monitoring well sampling, is ongoing.

  6. Project-based production and project management : Findings and trends in research on temporary systems in multiple contexts

    Pretorius, M.W.; Oerlemans, L.A.G.

    2014-01-01

    Globalisation is challenging almost every aspect of the political, economic, social and technological environment. Organisations, whether public or private, have to adapt their strategies and operations to stay competitive and efficient. Historically, organisations adopted project-based operations

  7. Characterizing fish responses to a river restoration over 21 years based on species' traits.

    Höckendorff, Stefanie; Tonkin, Jonathan D; Haase, Peter; Bunzel-Drüke, Margret; Zimball, Olaf; Scharf, Matthias; Stoll, Stefan

    2017-10-01

    Understanding restoration effectiveness is often impaired by a lack of high-quality, long-term monitoring data and, to date, few researchers have used species' trait information to gain insight into the processes that drive the reaction of fish communities to restoration. We examined fish-community responses with a highly resolved data set from 21 consecutive years of electrofishing (4 years prerestoration and 17 years postrestoration) at multiple restored and unrestored reaches from a river restoration project on the Lippe River, Germany. Fish abundance peaked in the third year after the restoration; abundance was 6 times higher than before the restoration. After 5-7 years, species richness and abundance stabilized at 2 and 3.5 times higher levels relative to the prerestoration level, respectively. However, interannual variability of species richness and abundance remained considerable, illustrating the challenge of reliably assessing restoration outcomes based on data from individual samplings, especially in the first years following restoration. Life-history and reproduction-related traits best explained differences in species' responses to restoration. Opportunistic short-lived species with early female maturity and multiple spawning runs per year exhibited the strongest increase in abundance, which reflected their ability to rapidly colonize new habitats. These often small-bodied and fusiform fishes typically live in dynamic and ephemeral instream and floodplain areas that river-habitat restorations often aim to create, and in this case their increases in abundance indicated successful restoration. Our results suggest that a greater consideration of species' traits may enhance the causal understanding of community processes and the coupling of restoration to functional ecology. Trait-based assessments of restoration outcomes would furthermore allow for easier transfer of knowledge across biogeographic borders than studies based on taxonomy. © 2017 Society for

  8. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office: watershed restoration projects: annual report, 1999.; ANNUAL

    2001-01-01

    The John Day River is the second longest free-flowing river in the contiguous United States and one of the few major subbasins in the Columbia River basin containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, the fourth largest drainage area in Oregon. With its beginning in the Strawberry Mountains near the town of Prairie City, the John Day flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring chinook salmon and summer steelhead, red band, westslope cutthroat, and redband trout, the John Day system is truly one of national significance. The entire John Day basin was granted to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) initiated contracting the majority of its construction implementation actions with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of the projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 1999, the JDBO and GSWCD proposed continuation of a successful partnership between the two agencies and basin landowners to implement an additional eleven (11

  9. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office: watershed restoration projects: annual report, 1998.; ANNUAL

    1999-01-01

    The John Day River is the second longest free-flowing river in the contiguous US and one of the few major subbasins in the Columbia River basin containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, the fourth largest drainage area in Oregon. With its beginning in the Strawberry Mountains near the town of Prairie City, the John Day flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring chinook salmon and summer steelhead, red band, westslope cutthroat, and redband trout, the John Day system is truly one of national significance. The entire John Day basin was granted to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) initiated contracting the majority of its construction implementation actions with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of the projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 1998, the JDBO and GSWCD proposed continuation of a successful partnership between the two agencies and basin landowners to implement an additional ten (10) watershed

  10. Student ownership of projects in an upper-division optics laboratory course: A multiple case study of successful experiences

    Dimitri R. Dounas-Frazer

    2017-12-01

    Full Text Available We investigate students’ sense of ownership of multiweek final projects in an upper-division optics lab course. Using a multiple case study approach, we describe three student projects in detail. Within-case analyses focused on identifying key issues in each project, and constructing chronological descriptions of those events. Cross-case analysis focused on identifying emergent themes with respect to five dimensions of project ownership: student agency, instructor mentorship, peer collaboration, interest and value, and affective responses. Our within- and cross-case analyses yielded three major findings. First, coupling division of labor with collective brainstorming can help balance student agency, instructor mentorship, and peer collaboration. Second, students’ interest in the project and perceptions of its value can increase over time; initial student interest in the project topic is not a necessary condition for student ownership of the project. Third, student ownership is characterized by a wide range of emotions that fluctuate as students alternate between extended periods of struggle and moments of success while working on their projects. These findings not only extend the literature on student ownership into a new educational domain—namely, upper-division physics labs—they also have concrete implications for the design of experimental physics projects in courses for which student ownership is a desired learning outcome. We describe the course and projects in sufficient detail that others can adapt our results to their particular contexts.

  11. Student ownership of projects in an upper-division optics laboratory course: A multiple case study of successful experiences

    Dounas-Frazer, Dimitri R.; Stanley, Jacob T.; Lewandowski, H. J.

    2017-12-01

    We investigate students' sense of ownership of multiweek final projects in an upper-division optics lab course. Using a multiple case study approach, we describe three student projects in detail. Within-case analyses focused on identifying key issues in each project, and constructing chronological descriptions of those events. Cross-case analysis focused on identifying emergent themes with respect to five dimensions of project ownership: student agency, instructor mentorship, peer collaboration, interest and value, and affective responses. Our within- and cross-case analyses yielded three major findings. First, coupling division of labor with collective brainstorming can help balance student agency, instructor mentorship, and peer collaboration. Second, students' interest in the project and perceptions of its value can increase over time; initial student interest in the project topic is not a necessary condition for student ownership of the project. Third, student ownership is characterized by a wide range of emotions that fluctuate as students alternate between extended periods of struggle and moments of success while working on their projects. These findings not only extend the literature on student ownership into a new educational domain—namely, upper-division physics labs—they also have concrete implications for the design of experimental physics projects in courses for which student ownership is a desired learning outcome. We describe the course and projects in sufficient detail that others can adapt our results to their particular contexts.

  12. Restoration in South Africa

    Blignaut, J

    2010-01-01

    Full Text Available Restoration can provide a wide range of direct and indirect benefits to society. However, there are very few projects that have attempted to properly quantify those benefits and present them in such a way that society is motivated to invest...

  13. Effects of Multiple Intelligences Supported Project-Based Learning on Students' Achievement Levels and Attitudes towards English Lesson

    Bas, Gökhan; Beyhan, Ömer

    2010-01-01

    The aim of the research was to investigate the effects of multiple intelligences supported project-based learning and traditional foreign language-teaching environment on students' achievement and their attitude towards English lesson. The research was carried out in 2009-2010 education-instruction year in Karatli Sehit Sahin Yilmaz Elementary…

  14. The passive river restoration approach as an efficient tool to improve the hydromorphological diversity of rivers - Case study from two river restoration projects in the German lower mountain range

    Groll, M.

    2017-09-01

    Intensive use of European rivers during the last hundreds of years has led to profound changes in the physicochemical properties, river morphology, and aquatic faunistic communities. Rectifying these changes and improving the ecological state of all surface water bodies is the central aim of the European Water Frame Directive (WFD), and river restoration measures are the main tool to achieve this goal for many rivers. As the cost-effectiveness of all measures is crucial to the WFD implementation, the approach of the passive river restoration has become very popular over the last decades. But while costs of this approach are minimal, not much is known about the long-term effectiveness of passive river restorations. The research presented here provides essential and in-depth data about the effects of two such restoration measures on the riverbed morphology of a large river of the lower mountain region in Germany (type 9.2). More than 3200 data sets were acquired using the TRiSHa method (Typology of Riverbed Structures and Habitats). The results show a high spatial and temporal diversity and dynamic for all analyzed hydromorphologic parameters - ranging from riverbed sediments, organic structures like dead wood or macrophytes, to the distribution of 32 microhabitat types. The structures and their dynamic depend on the character of the study area (free-flowing or impounded), the location of the study sites within the research area (main channel or restored side channel), and on the occurrence of major flood events (the mapping and sampling were conducted annually from 2006 to 2008 with a 50-year flood event occurring in early 2007). These results show the potential of the passive restoration approach for creating morphologically diverse riverbeds, as habitat diversity and the spatial heterogeneity of the riverbed substrates increased significantly (e.g., more than 40% of all habitat types were only detected in the newly restored side channels). But the results also

  15. Mapping compound cosmic telescopes containing multiple projected cluster-scale halos

    Ammons, S. Mark [Lawrence Livermore National Laboratory, Physics Division L-210, 7000 East Ave., Livermore, CA 94550 (United States); Wong, Kenneth C. [EACOA Fellow, Institute of Astronomy and Astrophysics, Academia Sinica (ASIAA), Taipei 10641, Taiwan (China); Zabludoff, Ann I. [Steward Observatory, University of Arizona, 933 Cherry Ave., Tucson, AZ 85721 (United States); Keeton, Charles R., E-mail: ammons1@llnl.gov, E-mail: kwong@as.arizona.edu, E-mail: aiz@email.arizona.edu, E-mail: keeton@physics.rutgers.edu [Department of Physics and Astronomy, Rutgers University, 136 Frelinghuysen Road, Piscataway, NJ 08854 (United States)

    2014-01-20

    Lines of sight with multiple projected cluster-scale gravitational lenses have high total masses and complex lens plane interactions that can boost the area of magnification, or étendue, making detection of faint background sources more likely than elsewhere. To identify these new 'compound' cosmic telescopes, we have found directions in the sky with the highest integrated mass densities, as traced by the projected concentrations of luminous red galaxies (LRGs). We use new galaxy spectroscopy to derive preliminary magnification maps for two such lines of sight with total mass exceeding ∼3 × 10{sup 15} M {sub ☉}. From 1151 MMT Hectospec spectra of galaxies down to i {sub AB} = 21.2, we identify two to three group- and cluster-scale halos in each beam. These are well traced by LRGs. The majority of the mass in beam J085007.6+360428 (0850) is contributed by Zwicky 1953, a massive cluster at z = 0.3774, whereas beam J130657.5+463219 (1306) is composed of three halos with virial masses of 6 × 10{sup 14}-2 × 10{sup 15} M {sub ☉}, one of which is A1682. The magnification maps derived from our mass models based on spectroscopy and Sloan Digital Sky Survey photometry alone display substantial étendue: the 68% confidence bands on the lens plane area with magnification exceeding 10 for a source plane of z{sub s} = 10 are [1.2, 3.8] arcmin{sup 2} for 0850 and [2.3, 6.7] arcmin{sup 2} for 1306. In deep Subaru Suprime-Cam imaging of beam 0850, we serendipitously discover a candidate multiply imaged V-dropout source at z {sub phot} = 5.03. The location of the candidate multiply imaged arcs is consistent with the critical curves for a source plane of z = 5.03 predicted by our mass model. Incorporating the position of the candidate multiply imaged galaxy as a constraint on the critical curve location in 0850 narrows the 68% confidence band on the lens plane area with μ > 10 and z{sub s} = 10 to [1.8, 4.2] arcmin{sup 2}, an étendue range comparable to that of

  16. Effects of multiple intelligences supported project-based learning on students’ achievement levels and attitudes towards English lesson

    Gökhan BAŞ

    2010-07-01

    Full Text Available The aim of the research was to investigate the effects of multiple intelligences supported project-based learning and traditional foreign language-teaching environment on students' achievement and their attitude towards English lesson. The research was carried out in 2009 – 2010 education-instruction year in Karatli Sehit Sahin Yilmaz Elementary School, Nigde, Turkey. Totally 50 students in two different classes in the 5th grade of this school participated in the study. The results of the research showed a significant difference between the attitude scores of the experiment group and the control group. It was also found out that the multiple intelligences approach activities were more effective in thepositive development of the students’ attitudes. At the end of the research, it is revealed that the students who are educated by multiple intelligences supported project-based learning method are more successful and have a higher motivation level than the studentswho are educated by the traditional instructional methods.

  17. Interim restorations.

    Gratton, David G; Aquilino, Steven A

    2004-04-01

    Interim restorations are a critical component of fixed prosthodontic treatment, biologically and biomechanically. Interim restoration serves an important diagnostic role as a functional and esthetic try-in and as a blueprint for the design of the definitive prosthesis. When selecting materials for any interim restoration, clinicians must consider physical properties, handling properties, patient acceptance, and material cost. Although no single material meets all the requirements and material classification alone of a given product is not a predictor of clinical performance, bis-acryl materials are typically best suited to single-unit restorations, and poly(methylmethacrylate) interim materials are generally ideal for multi-unit, complex, long-term, interim fixed prostheses. As with most dental procedures, the technique used for fabrication has a greater effect on the final result than the specific material chosen.

  18. Restoring forests

    Jacobs, Douglass F.; Oliet, Juan A.; Aronson, James

    2015-01-01

    of land requiring restoration implies the need for spatial prioritization of restoration efforts according to cost-benefit analyses that include ecological risks. To design resistant and resilient ecosystems that can adapt to emerging circumstances, an adaptive management approach is needed. Global change......, in particular, imparts a high degree of uncertainty about the future ecological and societal conditions of forest ecosystems to be restored, as well as their desired goods and services. We must also reconsider the suite of species incorporated into restoration with the aim of moving toward more stress resistant...... and competitive combinations in the longer term. Non-native species may serve an important role under some circumstances, e.g., to facilitate reintroduction of native species. Propagation and field establishment techniques must promote survival through seedling stress resistance and site preparation. An improved...

  19. A synopsis of short-term response to alternative restoration treatments in sagebrush-steppe: the SageSTEP project

    McIver, James; Brunson, Mark; Bunting, Steve; Chambers, Jeanne; Doescher, Paul; Grace, James; Hulet, April; Johnson, Dale; Knick, Steven T.; Miller, Richard; Pellant, Mike; Pierson, Fred; Pyke, David; Rau, Benjamin; Rollins, Kim; Roundy, Bruce; Schupp, Eugene; Tausch, Robin; Williams, Jason

    2014-01-01

    The Sagebrush Steppe Treatment Evaluation Project (SageSTEP) is an integrated long-term study that evaluates ecological effects of alternative treatments designed to reduce woody fuels and to stimulate the herbaceous understory of sagebrush steppe communities of the Intermountain West. This synopsis summarizes results through 3 yr posttreatment. Woody vegetation reduction by prescribed fire, mechanical treatments, or herbicides initiated a cascade of effects, beginning with increased availability of nitrogen and soil water, followed by increased growth of herbaceous vegetation. Response of butterflies and magnitudes of runoff and erosion closely followed herbaceous vegetation recovery. Effects on shrubs, biological soil crust, tree cover, surface woody fuel loads, and sagebrush-obligate bird communities will take longer to be fully expressed. In the short term, cool wet sites were more resilient than warm dry sites, and resistance was mostly dependent on pretreatment herbaceous cover. At least 10 yr of posttreatment time will likely be necessary to determine outcomes for most sites. Mechanical treatments did not serve as surrogates for prescribed fire in how each influenced the fuel bed, the soil, erosion, and sage-obligate bird communities. Woody vegetation reduction by any means resulted in increased availability of soil water, higher herbaceous cover, and greater butterfly numbers. We identified several trade-offs (desirable outcomes for some variables, undesirable for others), involving most components of the study system. Trade-offs are inevitable when managing complex natural systems, and they underline the importance of asking questions about the whole system when developing management objectives. Substantial spatial and temporal heterogeneity in sagebrush steppe ecosystems emphasizes the point that there will rarely be a “recipe” for choosing management actions on any specific area. Use of a consistent evaluation process linked to monitoring may be the

  20. Methodology for ranking restoration options

    Jensen, Per Hedemann

    1999-01-01

    techniques as a function of contamination and site characteristics. The project includes analyses of existing remediation methodologies and contaminated sites, and is structured in the following steps:-characterisation of relevant contaminated sites -identication and characterisation of relevant restoration...... techniques -assessment of the radiological impact -development and application of a selection methodology for restoration options -formulation ofgeneric conclusions and development of a manual The project is intended to apply to situations in which sites with nuclear installations have been contaminated...

  1. Clinical observation of small-incision extracapsular cataract extraction with intraocular lens implantation for the treatment of cataract in the sight restoration project

    Xiao-Jian Cheng

    2014-04-01

    Full Text Available AIM: To analyze the clinical effects of small-incision extracapsular cataract extraction with intraocular lens implantation for the treatment of cataract.METHODS:Totally 642 cases 676 eyes of cataract were treated by small-incision extracapsular cataract extraction with intraocular lens implantation. Complication during and after operations and postoperative visual acuity was observed.RESULTS:Visual acuity of 670 eyes was ≥0.05 and off-blindness rate was 99.11%, and there was 627 eyes ≥0.3 and the off-disability rate was 92.75% after 1mo. Rupture of posterior capsule during surgery occurred in 24 eyes. Fifty-four eyes were corneal edema, and anterior chamber exudation were 26 eyes, and 23 eyes were hypertension after operation. CONCLUSION: There are a little complications during and after operation for cataract treated by small-incision extracapsular cataract extraction with intraocular lens implantation. Patients have good recovery after operation. This operation does not need high-standard equipments and is suitable in the sight restoration project.

  2. Improving Australia's renewable energy project policy and planning: A multiple stakeholder analysis

    Martin, Nigel; Rice, John

    2015-01-01

    Renewable Energy (RE) is part of Australia's and the world's energy supply matrix with over A$100 billion spent annually on RE projects since 2007. Businesses seeking to invest in RE projects, particularly in the wind and solar energy sectors, may face an onerous collection of planning approvals and permitting processes that impede investment and implementation. In this study, we draw on international and domestic stakeholder inputs to a governmental inquiry in Australia to show how RE projects might be approved in shortened timeframes with reduced associated costs. The process mapping and stakeholder analysis demonstrates that RE supply projects can benefit from standardized approval processes and documentation, a 360° deep engagement with stakeholders, and expanded electricity grid access in resource areas, augmented through supportive public policy and planning frameworks. In addition, stakeholder objections to project approval and implementation streamlining were used to contrast the efficacy of the proposed changes in policy. -- Highlights: •Highlights the over A$200 billion spent annually on global RE projects. •Describes a typical two stage, multi-layered governance RE project approval process. •Exposes long 3 year and multi-million dollar cost approvals for RE projects. •Identifies multi-million dollar remote grid connections as an RE project impediment. •Outlines RE project policy and guidelines shortcomings and proposed improvements

  3. ramic restorations

    Ashish R Jain

    2013-01-01

    Full Text Available Rehabilitation of a patient with severely worn dentition after restoring the vertical dimension is a complex procedure and assessment of the vertical dimension is an important aspect in these cases. This clinical report describes the full mouth rehabilitation of a patient who was clinically monitored to evaluate the adaptation to a removable occlusal splint to restore vertical dimension for a period 1 month and provisional restorations to determine esthetic and functional outcome for a period of 3 months. It is necessary to recognizing that form follows function and that anterior teeth play a vital role in the maintenance of oral health. Confirmation of tolerance to changes in the vertical dimension of occlusion (VDO is of paramount importance. Articulated study casts and a diagnostic wax-up can provide important information for the evaluation of treatment options. Alteration of the VDO should be conservative and should not be changed without careful consideration.

  4. Hair restoration.

    Rawnsley, Jeffrey D

    2008-08-01

    The impact of male hair loss as a personal and social marker of aging is tremendous and its persistence as a human concern throughout recorded history places it in the forefront of male concern about the physical signs of aging. Restoration of the frontal hairline has the visual effect of re-establishing facial symmetry and turning back time. Follicular unit transplantation has revolutionized hair restoration, with its focus on redistributing large numbers of genetically stable hair to balding scalp in a natural distribution. Follicular unit hair restoration surgery is a powerful tool for the facial plastic surgeon in male aesthetic facial rejuvenation because it offers high-impact, natural-appearing results with minimal downtime and risk for adverse outcome.

  5. Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to a Large Scale Hydropower Construction Project

    Xu, Jiuping

    2014-01-01

    This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method. PMID:24550708

  6. Multimode resource-constrained multiple project scheduling problem under fuzzy random environment and its application to a large scale hydropower construction project.

    Xu, Jiuping; Feng, Cuiying

    2014-01-01

    This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method.

  7. Marine Ecosystem Restoration in Changing European Seas

    Ounanian, Kristen; Delaney, Alyne; Carballo Cárdenas, Eira

    2017-01-01

    and using different narratives of marine restoration, and being confronted with different forms of uncertainties. The paper’s overall contribution is the synthesis of these seemingly disparate components (narratives of restoration, uncertainty in decision making, and governance arrangements) to evaluate...... the impact of existing (maritime and environmental) policies, the governance setting, definitions of restoration and uncertainties on the effectiveness of marine restoration projects. Such a synthesis is a necessary move toward a systematic evaluation of ways to govern and formally institutionalize marine...

  8. Prioritizing ecological restoration among sites in multi-stressor landscapes.

    Neeson, Thomas M; Smith, Sigrid D P; Allan, J David; McIntyre, Peter B

    2016-09-01

    Most ecosystems are impacted by multiple local and long-distance stressors, many of which interact in complex ways. We present a framework for prioritizing ecological restoration efforts among sites in multi-stressor landscapes. Using a simple model, we show that both the economic and sociopolitical costs of restoration will typically be lower at sites with a relatively small number of severe problems than at sites with numerous lesser problems. Based on these results, we propose using cumulative stress and evenness of stressor impact as complementary indices that together reflect key challenges of restoring a site to improved condition. To illustrate this approach, we analyze stressor evenness across the world's rivers and the Laurentian Great Lakes. This exploration reveals that evenness and cumulative stress are decoupled, enabling selection of sites where remediating a modest number of high-intensity stressors could substantially reduce cumulative stress. Just as species richness and species evenness are fundamental axes of biological diversity, we argue that cumulative stress and stressor evenness constitute fundamental axes for identifying restoration opportunities in multi-stressor landscapes. Our results highlight opportunities to boost restoration efficiency through strategic use of multi-stressor datasets to identify sites that maximize ecological response per stressor remediated. This prioritization framework can also be expanded to account for the feasibility of remediation and the expected societal benefits of restoration projects. © 2016 by the Ecological Society of America.

  9. Remote sensing for restoration planning: how the big picture can inform stakeholders

    Susan Cordell; Erin J. Questad; Gregory P. Asner; Kealoha M. Kinney; Jarrod M. Thaxton; Amanda Uowolo; Sam Brooks; Mark W. Chynoweth

    2016-01-01

    The use of remote sensing in ecosystem management has transformed how land managers, practitioners, and policymakers evaluate ecosystem loss, gain, and change at multiple spatial and temporal scales. Less developed is the use of these spatial tools for planning, implementing, and evaluating ecosystem restoration projects and especially so in multifunctional...

  10. Transparent Restoration

    Barou, L.; Bristogianni, T.; Oikonomopoulou, F.

    2017-01-01

    This paper investigates the application of structural glass in restoration and conservation practices in order to highlight and safeguard our built heritage. Cast glass masonry is introduced in order to consolidate a half-ruined historic tower in Greece, by replacing the original parts of the façade

  11. Restorative neuroscience

    Andres, Robert H; Meyer, Morten; Ducray, Angélique D

    2008-01-01

    There is increasing interest in the search for therapeutic options for diseases and injuries of the central nervous system (CNS), for which currently no effective treatment strategies are available. Replacement of damaged cells and restoration of function can be accomplished by transplantation of...

  12. Environmental Restoration

    Zeevaert, T.; Vanmarcke, H

    1998-07-01

    The objectives of SCK-CEN's programme on environmental restoration are (1) to optimize and validate models for the impact assessment from environmental, radioactive contaminations, including waste disposal or discharge; (2) to support the policy of national authorities for public health and radioactive waste management. Progress and achievements in 1997 are reported.

  13. Strategic Environmental Research and Development Project FY 1994: Assessing national remote sensing technologies for use in US Department of Energy Environmental Restoration Activities, Oak Ridge Solid Waste Storage Area 4 case study

    King, A.L.; Smyre, J.L.; Evers, T.K.

    1995-02-01

    During FY 1994, the Oak Ridge Environmental Restoration (ER) Remote Sensing Program teamed with members of the Oak Ridge National Security Program Office (NSPO), the Environmental Research Institute of Michigan (ERIM) under contract to the National Exploitation Laboratory (NEL), the Oak Ridge Waste Area Group 4 (WAG 4) ER Program, and the US Department of Energy (DOE), Offices of Technology Development, Nonproliferation and National Security, and Environmental Restoration, to conduct a test and demonstration of the uses of national remote sensing technologies at DOE hazardous waste sites located in Oak Ridge, Tennessee. Objectives of the Oak Ridge study were to determine if national remote sensing technologies are useful in conducting prescreening, characterization, and/or monitoring activities to expedite the clean-up process at hazardous waste sites and to cut clean-up costs wherever possible. This project was sponsored by the Strategic Environmental Research and Development Project (SERDP)

  14. Estimating Required Contingency Funds for Construction Projects using Multiple Linear Regression

    Cook, Jason J

    2006-01-01

    Cost overruns are a critical problem for construction projects. The common practice for dealing with cost overruns is the assignment of an arbitrary flat percentage of the construction budget as a contingency fund...

  15. A New Nonmonetary Metric for Indicating Environmental Benefits from Ecosystem Restoration Projects of the U.S. Army Corps of Engineers, Report 2

    2010-07-01

    derives its authority for restoring ecosystems though the geophysical environment (hydrology and geomorphology of rivers and coastal zones ), whether or...McClain. 2005. Riparia : Ecology, conservation, and management of streamside communities. San Diego, CA: Elsevier Academic Press. National

  16. Effects of Business Model Development Projects on Organizational Culture: A Multiple Case Study of SMEs

    Ulla Santti

    2017-08-01

    Full Text Available Previous research has shown that links between organizational culture and innovativeness/performance may act as a “social glue” that helps a company develop organizational culture as a competitive advantage. In this study of three case companies, the organizational culture change due business model development projects is studied using the Competing Values Framework (CVF tool and interviews with respondents about discovered changes. To reveal intervention and implied effects between business model development project and organizational culture changes, we used CIMO logic (context, intervention, mechanism, and outcome to bridge practice and theory by explanatory, backward-looking research. Our case studies of companies in relatively short-duration business model development projects indicate that organizational culture may have some dynamic characteristics, for example, an increase of the adhocracy organizational type in all case companies or an increase in the hierarchical leadership type in one case company. Thus, the development of an organizational culture type can be partly controlled. Our results also indicated business model development projects do have a minor effect on organizational culture, even when development activities have not been put fully into practice. However, the more comprehensively business model development project activities have been put into practice, the larger the effect on organizational culture.

  17. Assessment Of Carbon Leakage In Multiple Carbon-Sink Projects: ACase Study In Jambi Province, Indonesia

    Boer, Rizaldi; Wasrin, Upik R.; Hendri, Perdinan; Dasanto,Bambang D.; Makundi, Willy; Hero, Julius; Ridwan, M.; Masripatin, Nur

    2007-06-01

    Rehabilitation of degraded forest land throughimplementation of carbon sink projects can increase terrestrial carbonstock. However, carbon emissions outside the project boundary, which iscommonly referred to as leakage, may reduce or negate the sequestrationbenefits. This study assessed leakage from carbon sink projects thatcould potentially be implemented in the study area comprised of elevensub-districts in the Batanghari District, Jambi Province, Sumatra,Indonesia. The study estimates the probability of a given land use/coverbeing converted into other uses/cover, by applying a logit model. Thepredictor variables were: proximity to the center of the land use area,distance to transportation channel (road or river), area of agriculturalland, unemployment (number of job seekers), job opportunities, populationdensity and income. Leakage was estimated by analyzing with and withoutcarbon sink projects scenarios. Most of the predictors were estimated asbeing significant in their contribution to land use cover change. Theresults of the analysis show that leakage in the study area can be largeenough to more than offset the project's carbon sequestration benefitsduring the period 2002-2012. However, leakage results are very sensitiveto changes of carbon density of the land uses in the study area. Byreducing C-density of lowland and hill forest by about 10 percent for thebaseline scenario, the leakage becomes positive. Further data collectionand refinement is therefore required. Nevertheless, this study hasdemonstrated that regional analysis is a useful approach to assessleakage.

  18. A STUDY ON OPTIMISATION OF RESOURCES FOR MULTIPLE PROJECTS BY USING PRIMAVERA

    B. S. K. REDDY

    2015-02-01

    Full Text Available Resources play vital role in construction projects. The performance of construction industry depends chiefly on how best the resources are managed. Optimisation play pivotal role in resource management, but task is highly haphazard and chaotic under the influence of complexities and vastness. Management always looks for optimum utility of resources available with them. Hence, the project management has got important place especially in resource allocation and smooth functioning with allocated budget. To achieve these goals and to exercise enhance optimisation certain tools are used for resource allocation optimally. Present work illustrates resource optimisation exercises on two ongoing projects in Dubai, UAE. Resource demands of project A & B are individually levelled and observed cumulative requirement is 17475. In other option demands of projects A & B are aggregated and then together levelled, the necessary resource observed is 16490. Comparison of individually levelled and then combined option with aggregated and then levelled clearly indicates reduction in demand of resources by 5.65% in later option, which could be best considered for economy.

  19. Minimizing waste in environmental restoration

    Moos, L.; Thuot, J.R.

    1996-01-01

    Environmental restoration, decontamination and decommissioning and facility dismantelment projects are not typically known for their waste minimization and pollution prevention efforts. Typical projects are driven by schedules and milestones with little attention given to cost or waste minimization. Conventional wisdom in these projects is that the waste already exists and cannot be reduced or minimized. In fact, however, there are three significant areas where waste and cost can be reduced. Waste reduction can occur in three ways: beneficial reuse or recycling; segregation of waste types; and reducing generation of secondary waste. This paper will discuss several examples of reuse, recycle, segregation, and secondary waste reduction at ANL restoration programs

  20. Managing a complex project using a risk-risk multiple domain matrix

    Pointurier, C.; Marle, F.; Jaber, H.

    2014-01-01

    This communication aims at presenting a clustering methodology applied to a complex project consisting of the delivery of three interdependent subsystems. This enables small and complementary task forces to be constituted, enhancing the communication and coordination on transverse issues related to the complexity of the whole system. The problem is to gather and exploit data for such systems, with numerous and heterogeneous risks of different domains (product, process, organization). The method consists in regrouping actors through the clustering of the risks they own. The result is a highlight on important and transverse risk interdependencies, within and between projects. These should not be neglected in order to avoid potential severe issues, whether during the project or during the exploitation of its deliverable. An application on a real program of plant implementation in the CEA-DAM is presented, with a sensitivity analysis of the clustering results to the inputs and chosen configurations of the problem. (authors)

  1. Simultaneous planning of the project scheduling and material procurement problem under the presence of multiple suppliers

    Tabrizi, Babak H.; Ghaderi, Seyed Farid

    2016-09-01

    Simultaneous planning of project scheduling and material procurement can improve the project execution costs. Hence, the issue has been addressed here by a mixed-integer programming model. The proposed model facilitates the procurement decisions by accounting for a number of suppliers offering a distinctive discount formula from which to purchase the required materials. It is aimed at developing schedules with the best net present value regarding the obtained benefit and costs of the project execution. A genetic algorithm is applied to deal with the problem, in addition to a modified version equipped with a variable neighbourhood search. The underlying factors of the solution methods are calibrated by the Taguchi method to obtain robust solutions. The performance of the aforementioned methods is compared for different problem sizes, in which the utilized local search proved efficient. Finally, a sensitivity analysis is carried out to check the effect of inflation on the objective function value.

  2. Management of citation verification requests for multiple projects at Sandia National Laboratories

    Crawford, C.S.

    1995-01-01

    Sandia National Laboratories' (SNL) Technical Library is now responsible for providing citation verification management support for all references cited in technical reports issued by the Nuclear Waste Management (NWM) Program. This paper dancing how this process is managed for the Yucca Mountain Site Characterization (YWP), Waste Isolation Pilot Plant (WIPP), Idaho National Engineering Laboratory (INEL), and Greater Confinement Disposal (GCD) projects. Since technical reports are the main product of these projects, emphasis is placed on meeting the constantly evolving needs of these customers in a timely and cost-effective manner

  3. XRF, μ-XRD and μ-spectroscopic techniques for revealing the composition and structure of paint layers on polychrome sculptures after multiple restorations.

    Franquelo, M L; Duran, A; Castaing, J; Arquillo, D; Perez-Rodriguez, J L

    2012-01-30

    This paper presents the novel application of recently developed analytical techniques to the study of paint layers on sculptures that have been restored/repainted several times across centuries. Analyses were performed using portable XRF, μ-XRD and μ-Raman instruments. Other techniques, such as optical microscopy, SEM-EDX and μ-FTIR, were also used. Pigments and other materials including vermilion, minium, red lac, ivory black, lead white, barium white, zinc white (zincite), titanium white (rutile and anatase), lithopone, gold and brass were detected. Pigments from both ancient and modern times were found due to the different restorations/repaintings carried out. μ-Raman was very useful to characterise some pigments that were difficult to determine by μ-XRD. In some cases, pigments identification was only possible by combining results from the different analytical techniques used in this work. This work is the first article devoted to the study of sculpture cross-section samples using laboratory-made μ-XRD systems. Copyright © 2011 Elsevier B.V. All rights reserved.

  4. Restorative justice innovations in Canada.

    Wilson, Robin J; Huculak, Bria; McWhinnie, Andrew

    2002-01-01

    As many jurisdictions move towards more retributive measures as a means to address public discontent with crime, a parallel movement has developed in regard to restorative justice. This article presents three restorative initiatives currently in use in Canada. Each initiative addresses offender behavior and community engagement at a different point in the justice continuum. The use of Sentencing Circles is an example of how restorative justice principles can be instituted at the front end, prior to an offender becoming lodged in the system. The Restorative Justice Options to Parole Suspension project demonstrates how community engagement can assist in preventing offenders from being returned to the system once they have achieved conditional release. The Circles of Support and Accountability project has enlisted the support of professionally supported volunteers in the community reintegration of high-risk sexual offenders. These initiatives are presented within a framework of effective correctional interventions and increased empowerment for a variety of stakeholders. Copyright 2002 John Wiley & Sons, Ltd.

  5. Effects of multiple intelligences supported project-based learning on students’ achievement levels and attitudes towards English lesson

    Gökhan Baş

    2007-07-01

    Full Text Available The aim of the research was to investigate the effects of multiple intelligences supported project-based learning and traditional foreign language-teaching environment on students’ achievement and their attitude towards English lesson. The research was carried out in 2009 – 2010 education-instruction year in Karatli Sehit Sahin Yilmaz Elementary School, Nigde, Turkey. Totally 50 students in two different classes in the 5th grade of this school participated in the study. The results of the research showed a significant difference between the attitude scores of the experiment group and the control group. It was also found out that the multiple intelligences approach activities were more effective in the positive development of the students’ attitudes. At the end of the research, it is revealed that the students who are educated by multiple intelligences supported project-based learning method are more successful and have a higher motivation level than the students who are educated by the traditional instructional methods.

  6. Climate change and watershed mercury export: a multiple projection and model analysis

    Future shifts in climatic conditions may impact watershed mercury (Hg) dynamics and transport. We apply an ensemble of watershed models to simulate and assess the responses of hydrological and total Hg (HgT) fluxes and concentrations to two climate change projections in the US Co...

  7. Collaborative Learning Using a Project across Multiple Business Courses: A Cognitive Load and Knowledge Convergence Approach

    Bhowmick, Sandeep; Chandra, Aruna; Harper, Jeffrey S.; Sweetin, Vernon

    2015-01-01

    Four business professors at a state university in the Midwestern United States launched a collaborative learning project grounded in cognitive learning theory and knowledge convergence theory with the objective of assessing student learning gains in cross-functional knowledge (CFK), course-related knowledge (CRK), and overall satisfaction with…

  8. An investigation of multiple time graphical analysis applied to projection data : Theory and validation

    Maguire, RP; Calonder, C; Leenders, KL

    1997-01-01

    Purpose: The determination of tissue time-activity course and pharmokinetics in PET is normally performed by region-of-interest analysis of reconstructed images. However, in some cases, the same analysis may equally well be performed on the data in projections before reconstruction, avoiding the

  9. A restoration genetics guide for coral reef conservation.

    Baums, Iliana B

    2008-06-01

    Worldwide degradation of coral reef communities has prompted a surge in restoration efforts. They proceed largely without considering genetic factors because traditionally, coral populations have been regarded as open over large areas with little potential for local adaptation. Since, biophysical and molecular studies indicated that most populations are closed over shorter time and smaller spatial scales. Thus, it is justified to re-examine the potential for site adaptation in corals. There is ample evidence for differentiated populations, inbreeding, asexual reproduction and the occurrence of ecotypes, factors that may facilitate local adaptation. Discovery of widespread local adaptation would influence coral restoration projects mainly with regard to the physical and evolutionary distance from the source wild and/or captive bred propagules may be moved without causing a loss of fitness in the restored population. Proposed causes for loss of fitness as a result of (plant) restoration efforts include founder effects, genetic swamping, inbreeding and/or outbreeding depression. Direct evidence for any of these processes is scarce in reef corals due to a lack of model species that allow for testing over multiple generations and the separation of the relative contributions of algal symbionts and their coral hosts to the overall performance of the coral colony. This gap in our knowledge may be closed by employing novel population genetic and genomics approaches. The use of molecular tools may aid managers in the selection of appropriate propagule sources, guide spatial arrangement of transplants, and help in assessing the success of coral restoration projects by tracking the performance of transplants, thereby generating important data for future coral reef conservation and restoration projects.

  10. Inkjet printing-based volumetric display projecting multiple full-colour 2D patterns

    Hirayama, Ryuji; Suzuki, Tomotaka; Shimobaba, Tomoyoshi; Shiraki, Atsushi; Naruse, Makoto; Nakayama, Hirotaka; Kakue, Takashi; Ito, Tomoyoshi

    2017-04-01

    In this study, a method to construct a full-colour volumetric display is presented using a commercially available inkjet printer. Photoreactive luminescence materials are minutely and automatically printed as the volume elements, and volumetric displays are constructed with high resolution using easy-to-fabricate means that exploit inkjet printing technologies. The results experimentally demonstrate the first prototype of an inkjet printing-based volumetric display composed of multiple layers of transparent films that yield a full-colour three-dimensional (3D) image. Moreover, we propose a design algorithm with 3D structures that provide multiple different 2D full-colour patterns when viewed from different directions and experimentally demonstrate prototypes. It is considered that these types of 3D volumetric structures and their fabrication methods based on widely deployed existing printing technologies can be utilised as novel information display devices and systems, including digital signage, media art, entertainment and security.

  11. An update on MS Nurse PROfessional, an ongoing project of the European Multiple Sclerosis Platform.

    Winslow, Anne

    2016-12-01

    Within the multidisciplinary team required to manage people with multiple sclerosis (MS) effectively, the nurse is the central component of coordinated care and support. A 2009 survey led by the European Multiple Sclerosis Platform, an umbrella organization of national MS associations, identified variance and disparity across Europe in the nursing care of MS patients. This led to development of MS Nurse PROfessional, a continuing medical education-accredited modular online learning program endorsed and approved by leading international nursing and professional groups, and people with MS, as a tool to support the evolving role of the European MS nurse. Analysis of participant experience and nurse practice to date has been overwhelmingly positive. Expansion of MS Nurse PRO is underway or planned for future.

  12. 30 CFR 874.14 - Water supply restoration.

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Water supply restoration. 874.14 Section 874.14... ABANDONED MINE LAND RECLAMATION GENERAL RECLAMATION REQUIREMENTS § 874.14 Water supply restoration. (a) Any... supply restoration projects. For purposes of this section, “water supply restoration projects” are those...

  13. Assessment of restoration measures efficiency for soil contamination in Mediterranean Ecosystem. The case study of Guadiamar Green Corridor in the context of RECARE project

    Anaya-Romero, Maria; José Blanco-Velázquez, Francisco; Muñoz-Vallés, Sara

    2017-04-01

    Restoration of soil ecosystems contaminated by heavy metals requires their characterization and the assessment of measures for risk reduction. Particular soil traits and history define different levels of resilience, so soil contamination assessment needs to take into account a site-by-site approach, which considers both the particular environmental characteristics of soils and the human activities. Nevertheless, current approaches for soil contamination assessment developed as academy and market solutions continue to be rather qualitative, and they do not allow as far the selection of efficient remediation measures to solve soil contamination at the long-term and extensively over larger áreas. In this context, under the framework of RECARE (Preventing and Remediating degradation of Soils in Europe through Land Care) project, we are designing a Decision Support System (DSS) which automatically assess soil contamination values by heavy metals in the topsoil and evaluate the efficiency of soil remediation measures under scenarios of climate and land-use change. The DSS works by simulating the spatio-temporal efficiency of three widely applied remediation measures (compost, sugar beet lime and iron-rich clayey materials). Input variables are divided into: (I) climate variables (mainly precipitation and temperature), (II) site variables (elevation, slope and erodibility), (III) soil (heavy metal content, pH, sand/clay content, soil organic carbon and bulk density), (IV) land use and (V) remediation measures. The predictor variables are related to soil functions expressed by % of change of heavy metal content (Currently the DSS consider cadmium dynamics due to the worldwide distribution in agricultural system and toxicity impact on health and plants), soil carbon and erosion dynamics. The pilot study area is the Guadiamar valley (SW Spain) where the main threat is soil contamination, after a mine spill occurred on April 1998. Since that time, a huge soil databse of

  14. Effects of Business Model Development Projects on Organizational Culture: A Multiple Case Study of SMEs

    Ulla Santti; Tuomo Eskelinen; Mervi Rajahonka; Kaija Villman; Ari Happonen

    2017-01-01

    Previous research has shown that links between organizational culture and innovativeness/performance may act as a “social glue” that helps a company develop organizational culture as a competitive advantage. In this study of three case companies, the organizational culture change due business model development projects is studied using the Competing Values Framework (CVF) tool and interviews with respondents about discovered changes. To reveal intervention and implied effects between business...

  15. Stone Soup Projects: Using real-time resources and creative partnering to meet multiple needs

    McLean, S.; Searle, R.; Zala, K.

    2010-12-01

    Ocean Networks Canada oversees the VENUS and NEPTUNE Canada undersea cabled observatories. Its Centre for Enterprise and Engagement communicates the scientific discoveries and technological innovations happening at the two systems. Not surprisingly, funders in ocean science are interested in seeing evidence of increased recruitment of Highly Qualified Personnel into marine science and industry. This demand creates a series of opportunities for inspiring students, ranging from graduate school down to middle school, to pursue studies in chemistry, biology, physics, geology, engineering, and beyond. As the Engagement section is a small operation, we partner with others to produce educational assets incorporating real-time data from VENUS and NEPTUNE Canada observatories that enable frontline educators to create exciting ocean science experiences for students and the public. In one project, the lab component of an entire undergraduate course lets students conduct their own investigations into marine oxygen levels by using VENUS data. In another, Fine Arts graduate and undergraduate students are using high-tech tools to create a series of webisodes that map the principles of Ocean Literacy onto the science themes of VENUS and NEPTUNE Canada. In a third project, we hosted a website for a collaborative expedition to small coastal towns that focused on the marine science happening in the Salish Sea, British Columbia. Our projects and challenges for engaging students and the public with ocean science using real-time and other data offer strategies for outreach and education sections of similar organizations.

  16. R&P: the multiple meaning of a research project in general practice.

    Visentin, Giorgio

    2005-08-01

    Rischio e Prevenzione (Risk and Prevention) is a research project that is becoming the paradigm of the Italian research on General Practice. It started from a survey showing that treatment and control of cardiovascular risk is still far from optimal even in very high-risk patients. A group of general practitioners, coordinated by Istituto Mario Negri, wrote the protocol of the study with various proposals: Creating a research network. Building research infrastructure with good research capacity. Building a 'therapeutic alliance' with the patient while presenting the research, not only obtaining their signature for a 'bureaucratic' informed consent. Having the 'Collaborative Group' as the 'sponsor' of a research even if the funds are coming from Pharmaceutical Industry. It is a randomised controlled trial (RCT) carried out in primary care with the normal patient of our daily work, so transferability is very possible. The way to enroll the patients and the request to specify the reason for not joining the project of the outcome study are a kind of participatory research. The outcome study can become a model for implementing new strategy on cardiovascular risk. A specific questionnaire will enquire the different point of view of the patient and of the general practitioner/researcher. The result of this project will help us understand the phenomenon of the poor compliance of the high-risk patients. First results during enrollment allow some optimism.

  17. Assessing floodplain restoration success using soil morphology indicators

    Guenat, Claire; Fournier, Bertrand; Bullinger-Weber, Géraldine; Grin, Karin; Pfund, Simona; Mitchell, Edward

    2010-05-01

    diversity, soil typicality, and soil dynamism) and their associated indicators (for example soil Shannon indexes, frequency of soils with specific characteristics, elevation variations due to the fluvial dynamic). The success of floodplain restoration is assessed through comparisons of these criteria between the restored river sector and a reference that could be a near natural floodplain or an embanked floodplain. As a test case, we used a near natural floodplain along the Rhine River as reference site. We then assessed the performance of the method by assessing how well the selected indicators explained a data set of soil physico-chemical characteristics in a principal component analysis. We applied this pedological tool to assess the efficiency of two rivers widening: the Thur (River Thur, CCES project RECORD: http://www.swiss-experiment.ch/index.php/Record:Home), and the Emme River restorations (http://www.bve.be.ch/site/bve_tba_dok_down_wasserbau_emme.pdf). In agreement with other studies, our results confirmed that these restoration projects were partial success. This study demonstrated that soil morphology presents multiple advantages as an indicator of floodplain restoration: ease of use, spatial delimitation of the floodplain, information on past events and fluvial dynamic, and different spatial levels of observation (topsoil horizons, deep horizons, and complete soil profiles).

  18. A High Resolution Hydrodynamic Model of Puget Sound to Support Nearshore Restoration Feasibility Analysis and Design

    Khangaonkar, Tarang; Yang, Zhaoqing

    2011-01-01

    Estuarine and coastal hydrodynamic processes are sometimes neglected in the design and planning of nearshore restoration actions. Despite best intentions, efforts to restore nearshore habitats can result in poor outcomes if circulation and transport which also affect freshwater-saltwater interactions are not properly addressed. Limitations due to current land use can lead to selection of sub-optimal restoration alternatives that may result in undesirable consequences, such as flooding, deterioration of water quality, and erosion, requiring immediate remedies and costly repairs. Uncertainty with achieving restoration goals, such as recovery of tidal exchange, supply of sediment and nutrients, and establishment of fish migration pathways, may be minimized by using numerical models designed for application to the nearshore environment. A high resolution circulation and transport model of the Puget Sound, in the state of Washington, was developed to assist with nearshore habitat restoration design and analysis, and to answer the question 'can we achieve beneficial restoration outcomes at small local scale, as well as at a large estuary-wide scale?' The Puget Sound model is based on an unstructured grid framework to define the complex Puget Sound shoreline using a finite volume coastal ocean model (FVCOM). The capability of the model for simulating the important nearshore processes, such as circulation in complex multiple tidal channels, wetting and drying of tide flats, and water quality and sediment transport as part of restoration feasibility, are illustrated through examples of restoration projects in Puget Sound.

  19. A new cognitive rehabilitation programme for patients with multiple sclerosis: the 'MS-line! Project'.

    Gich, Jordi; Freixenet, Jordi; Garcia, Rafael; Vilanova, Joan Carles; Genís, David; Silva, Yolanda; Montalban, Xavier; Ramió-Torrentà, Lluís

    2015-09-01

    Cognitive rehabilitation is often delayed in multiple sclerosis (MS). To develop a free and specific cognitive rehabilitation programme for MS patients to be used from early stages that does not interfere with daily living activities. MS-line!, cognitive rehabilitation materials consisting of written, manipulative and computer-based materials with difficulty levels developed by a multidisciplinary team. Mathematical, problem-solving and word-based exercises were designed. Physical materials included spatial, coordination and reasoning games. Computer-based material included logic and reasoning, working memory and processing speed games. Cognitive rehabilitation exercises that are specific for MS patients have been successfully developed. © The Author(s), 2014.

  20. The state-of-the-art of ART restorations.

    Frencken, Jo E

    2014-04-01

    ART is less anxiety- and pain-provoking than traditional restorative treatments; administration of local anaesthesia is rarely required. Systematic reviews have provided evidence of the high level of effectiveness of high-viscosity glass-ionomer ART restoration in restoring single-surface cavities, both in primary and permanent posterior teeth, but its survival rates in restoring multiple-surface cavities in primary posterior teeth needs to be improved. Insufficient information is available regarding the survival rates of multiple-surface ART restorations in permanent teeth. Evidence from these reviews indicates no difference in the survival rates of single-surface high-viscosity glass-ionomer ART restorations and amalgam restorations in primary and permanent posterior teeth. Where indicated, high-viscosity glass-ionomer ART restorations can be used alongside traditional restorations. ART provides a much more acceptable introduction to dental restorative care than the traditional 'injection, drill and fill'.

  1. River Restoration and Meanders

    G. Mathias Kondolf

    2006-12-01

    Full Text Available Among the most visually striking river restoration projects are those that involve the creation of a new channel, often in a new alignment and generally with a form and dimensions that are different from those of the preproject channel. These channel reconstruction projects often have the objective of creating a stable, single-thread, meandering channel, even on rivers that were not historically meandering, on rivers whose sediment load and flow regime would not be consistent with such stable channels, or on already sinuous channels whose bends are not symmetrical. Such meandering channels are often specified by the Rosgen classification system, a popular restoration design approach. Although most projects of this type have not been subject to objective evaluation, completed postproject appraisals show that many of these projects failed within months or years of construction. Despite its, at best, mixed results, this classification and form-based approach continues to be popular because it is easy to apply, because it is accessible to those without formal training in fluvial geomorphology, and probably because it satisfies a deep-seated, although unrecognized, cultural preference for single-thread meandering channels. This preference is consistent with 18th-century English landscape theories, which held the serpentine form to be ideal and led to widespread construction of meandering channels on the country estates of the era. The preference for stability in restored channels seems to be widely accepted by practitioners and funders despite the fact that it is antithetical to research showing that dynamically migrating channels have the greatest ecological richness.

  2. Projecting future precipitation and temperature at sites with diverse climate through multiple statistical downscaling schemes

    Vallam, P.; Qin, X. S.

    2017-10-01

    Anthropogenic-driven climate change would affect the global ecosystem and is becoming a world-wide concern. Numerous studies have been undertaken to determine the future trends of meteorological variables at different scales. Despite these studies, there remains significant uncertainty in the prediction of future climates. To examine the uncertainty arising from using different schemes to downscale the meteorological variables for the future horizons, projections from different statistical downscaling schemes were examined. These schemes included statistical downscaling method (SDSM), change factor incorporated with LARS-WG, and bias corrected disaggregation (BCD) method. Global circulation models (GCMs) based on CMIP3 (HadCM3) and CMIP5 (CanESM2) were utilized to perturb the changes in the future climate. Five study sites (i.e., Alice Springs, Edmonton, Frankfurt, Miami, and Singapore) with diverse climatic conditions were chosen for examining the spatial variability of applying various statistical downscaling schemes. The study results indicated that the regions experiencing heavy precipitation intensities were most likely to demonstrate the divergence between the predictions from various statistical downscaling methods. Also, the variance computed in projecting the weather extremes indicated the uncertainty derived from selection of downscaling tools and climate models. This study could help gain an improved understanding about the features of different downscaling approaches and the overall downscaling uncertainty.

  3. Capturing the multiple benefits associated with nature-based solutions: lessons from natural flood management project in the Cotswolds, UK

    Short, Chrisopher; Clarke, Lucy; Uttley, Chris; Smith, Brian

    2017-04-01

    co-management and suggest how this type of framework is suitable for a range of nature-based solutions across Europe. However, the challenge remains of capturing the multiple-benefits that such projects offer as these are often missed through conventional approaches such as cost-benefit analysis and some reflections on this will also be presented along with a potential way forward.

  4. Fernald restoration: ecologists and engineers integrate restoration and cleanup

    Woods, Eric; Homer, John

    2002-07-15

    As cleanup workers excavate pits and tear down buildings at the Fernald site in southwest Ohio, site ecologists are working side-by-side to create thriving wetlands and develop the early stages of forest, prairie, and savanna ecosystems to restore natural resources that were impacted by years of site operations. In 1998, the U.S. Department of Energy-Fernald Office (DOE-FN) and its cleanup contractor, Fluor Fernald, Inc., initiated several ecological restoration projects in perimeter areas of the site (e.g., areas not used for or impacted by uranium processing or waste management). The projects are part of Fernald's final land use plan to restore natural resources over 904 acres of the 1,050-acre site. Pete Yerace, the DOE-FN Natural Resource Trustee representative is working with the Fernald Natural Resource Trustees in an oversight role to resolve the state of Ohio's 1986 claim against DOE for injuries to natural resources. Fluor Fernald, Inc., and DOE-FN developed the ''Natural Resource Restoration Plan'', which outlines 15 major restoration projects for the site and will restore injured natural resources at the site. In general, Fernald's plan includes grading to maximize the formation of wetlands or expanded floodplain, amending soil where topsoil has been removed during excavation, and establishing native vegetation throughout the site. Today, with cleanup over 35 percent complete and site closure targeted for 2006, Fernald is entering a new phase of restoration that involves heavily remediated areas. By working closely with engineers and cleanup crews, site ecologists can take advantage of remediation fieldwork (e.g., convert an excavated depression into a wetland) and avoid unnecessary costs and duplication. This collaboration has also created opportunities for relatively simple and inexpensive restoration of areas that were discovered during ongoing remediation. To ensure the survival of the plant material in heavily

  5. Multiple Drug Treatments That Increase cAMP Signaling Restore Long-Term Memory and Aberrant Signaling in Fragile X Syndrome Models

    Choi, Catherine H.; Schoenfeld, Brian P.; Bell, Aaron J.; Hinchey, Joseph; Rosenfelt, Cory; Gertner, Michael J.; Campbell, Sean R.; Emerson, Danielle; Hinchey, Paul; Kollaros, Maria; Ferrick, Neal J.; Chambers, Daniel B.; Langer, Steven; Sust, Steven; Malik, Aatika; Terlizzi, Allison M.; Liebelt, David A.; Ferreiro, David; Sharma, Ali; Koenigsberg, Eric; Choi, Richard J.; Louneva, Natalia; Arnold, Steven E.; Featherstone, Robert E.; Siegel, Steven J.; Zukin, R. Suzanne; McDonald, Thomas V.; Bolduc, Francois V.; Jongens, Thomas A.; McBride, Sean M. J.

    2016-01-01

    Fragile X is the most common monogenic disorder associated with intellectual disability (ID) and autism spectrum disorders (ASD). Additionally, many patients are afflicted with executive dysfunction, ADHD, seizure disorder and sleep disturbances. Fragile X is caused by loss of FMRP expression, which is encoded by the FMR1 gene. Both the fly and mouse models of fragile X are also based on having no functional protein expression of their respective FMR1 homologs. The fly model displays well defined cognitive impairments and structural brain defects and the mouse model, although having subtle behavioral defects, has robust electrophysiological phenotypes and provides a tool to do extensive biochemical analysis of select brain regions. Decreased cAMP signaling has been observed in samples from the fly and mouse models of fragile X as well as in samples derived from human patients. Indeed, we have previously demonstrated that strategies that increase cAMP signaling can rescue short term memory in the fly model and restore DHPG induced mGluR mediated long term depression (LTD) in the hippocampus to proper levels in the mouse model (McBride et al., 2005; Choi et al., 2011, 2015). Here, we demonstrate that the same three strategies used previously with the potential to be used clinically, lithium treatment, PDE-4 inhibitor treatment or mGluR antagonist treatment can rescue long term memory in the fly model and alter the cAMP signaling pathway in the hippocampus of the mouse model. PMID:27445731

  6. Multiple chemical sensitivity and workplace discrimination: the national EEOC ADA research project.

    Vierstra, Courtney V; Rumrill, Phillip D; Koch, Lynn C; McMahon, Brian T

    2007-01-01

    Information from the Integrated Mission System of the United States Equal Employment Opportunity Commission (EEOC) was used to investigate the employment discrimination experiences of Americans with multiple chemical sensitivity (MCS) in comparison to Americans in a general disability group with allergies, asthma, HIV, gastrointestinal impairment, cumulative trauma disorder and tuberculosis. Specifically, the researchers examined demographic characteristics of the charging parties; the industry designation, location, and size of employers against whom allegations were filed; the nature of discrimination (i.e., type of adverse action) alleged to occur; and the legal outcomes or resolutions of these allegations. Findings indicate that persons with MCS were, on average, older than the comparison group and comparatively overrepresented by Caucasians and women. People with MCS were proportionally more likely than the comparison group to allege discrimination related to reasonable accommodations. People with MCS were proportionally more likely than the comparison group to file allegations against employers in the manufacturing and public administration industries, employers with 201-500 workers, and employers in the Western Census region. People with MCS were proportionally more likely than the comparison group to receive non-merit resolutions as a result of the EEOC's Americans with Disabilities Act Title I investigatory process. Implications for policy and advocacy are addressed.

  7. Development of decontamination, decommissioning and environmental restoration technology

    Lee, Byung Jik; Kwon, H S; Kim, G N. and others

    1999-03-01

    Through the project of 'Development of decontamination, decommissioning and environmental restoration technology', the followings were studied. 1. Development of decontamination and repair technology for nuclear fuel cycle facilities 2. Development of dismantling technology 3. Development of environmental restoration technology. (author)

  8. South Bay Salt Pond Tidal Wetland Restoration Phase II Planning

    Information about the SFBWQP South Bay Salt Pond Tidal Wetland Restoration Phase II Planning project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic re

  9. South Bay Salt Pond Restoration, Phase II at Ravenswood

    Information about the South Bay Salt Pond Restoration Project: Phase II Construction at Ravenswood, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  10. Hurricanes Katrina and Rita and the Coastal Louisiana Ecosystem Restoration

    Zinn, Jeffrey

    2005-01-01

    ... for a $1.1 billion multiyear program to construct five projects that would help to restore portions of the coastal Louisiana ecosystem by slowing the rate of wetland loss and restoring some wetlands...

  11. Importance of including cultural practices in ecological restoration.

    Wehi, Priscilla M; Lord, Janice M

    2017-10-01

    Ecosystems worldwide have a long history of use and management by indigenous cultures. However, environmental degradation can reduce the availability of culturally important resources. Ecological restoration aims to repair damage to ecosystems caused by human activity, but it is unclear how often restoration projects incorporate the return of harvesting or traditional life patterns for indigenous communities. We examined the incorporation of cultural use of natural resources into ecological restoration in the context of a culturally important but protected New Zealand bird; among award-winning restoration projects in Australasia and worldwide; and in the peer-reviewed restoration ecology literature. Among New Zealand's culturally important bird species, differences in threat status and availability for hunting were large. These differences indicate the values of a colonizing culture can inhibit harvesting by indigenous people. In Australasia among award-winning ecological restoration projects, restored areas beyond aesthetic or recreational use, despite many projects encouraging community participation. Globally, restoration goals differed among regions. For example, in North America, projects were primarily conservation oriented, whereas in Asia and Africa projects frequently focused on restoring cultural harvesting. From 1995 to 2014, the restoration ecology literature contained few references to cultural values or use. We argue that restoration practitioners are missing a vital component for reassembling functional ecosystems. Inclusion of sustainably harvestable areas within restored landscapes may allow for the continuation of traditional practices that shaped ecosystems for millennia, and also aid project success by ensuring community support. © 2017 Society for Conservation Biology.

  12. Student nurse selection and predictability of academic success: The Multiple Mini Interview project.

    Gale, Julia; Ooms, Ann; Grant, Robert; Paget, Kris; Marks-Maran, Di

    2016-05-01

    With recent reports of public enquiries into failure to care, universities are under pressure to ensure that candidates selected for undergraduate nursing programmes demonstrate academic potential as well as characteristics and values such as compassion, empathy and integrity. The Multiple Mini Interview (MMI) was used in one university as a way of ensuring that candidates had the appropriate numeracy and literacy skills as well as a range of communication, empathy, decision-making and problem-solving skills as well as ethical insights and integrity, initiative and team-work. To ascertain whether there is evidence of bias in MMIs (gender, age, nationality and location of secondary education) and to determine the extent to which the MMI is predictive of academic success in nursing. A longitudinal retrospective analysis of student demographics, MMI data and the assessment marks for years 1, 2 and 3. One university in southwest London. One cohort of students who commenced their programme in September 2011, including students in all four fields of nursing (adult, child, mental health and learning disability). Inferential statistics and a Bayesian Multilevel Model. MMI in conjunction with MMI numeracy test and MMI literacy test shows little or no bias in terms of ages, gender, nationality or location of secondary school education. Although MMI in conjunction with numeracy and literacy testing is predictive of academic success, it is only weakly predictive. The MMI used in conjunction with literacy and numeracy testing appears to be a successful technique for selecting candidates for nursing. However, other selection methods such as psychological profiling or testing of emotional intelligence may add to the extent to which selection methods are predictive of academic success on nursing. Copyright © 2016 Elsevier Ltd. All rights reserved.

  13. Climate Scenarios for the NASA / USAID SERVIR Project: Challenges for Multiple Planning Horizons

    Robertson, Franklin R.; Roberts, J. B.; Lyon, B.; Funk, C.; Bosilovich, M. G.

    2014-01-01

    SERVIR, an acronym meaning "to serve" in Spanish, is a joint venture between NASA and the U.S. Agency for International Development (USAID) which provides satellite-based Earth observation data, modeling, and science applications to help developing nations in Central America, East Africa and the Himalayas improve environmental decision making. Anticipating climate variability / climate change impacts has now become an important component of the SERVIR efforts to build capacity in these regions. Uncertainty in hydrometeorological components of climate variations and exposure to extreme events across scales from weather to climate are of particular concern. We report here on work to construct scenarios or outlooks that are being developed as input drivers for decision support systems (DSSs) in a variety of settings. These DSSs are being developed jointly by a broad array NASA Applied Science Team (AST) Investigations and user communities in the three SERVIR Hub Regions, Central America, East Africa and the Himalayas. Issues span hydrologic / water resources modeling, agricultural productivity, and forest carbon reserves. The scenarios needed for these efforts encompass seasonal forecasts, interannual outlooks, and likely decadal / multi-decadal trends. Providing these scenarios across the different AST efforts enables some level of integration in considering regional responses to climate events. We will discuss a number of challenges in developing this continuum of scenarios including the identification and "mining" of predictability, addressing multiple continental regions, issues of downscaling global model integrations to regional / local applications (i.e. hydrologic and crop modeling). We compare / contrast the role of the U.S. National Multi- Model Experiment initiative in seasonal forecasts and the CMIP-5 climate model experiments in supporting these efforts. Examples of these scenarios, their use, and an assessment of their utility as well as limitations will

  14. Presenting evidence-based health information for people with multiple sclerosis: the IN-DEEP project protocol.

    Hill, Sophie; Filippini, Graziella; Synnot, Anneliese; Summers, Michael; Beecher, Deirdre; Colombo, Cinzia; Mosconi, Paola; Battaglia, Mario A; Shapland, Sue; Osborne, Richard H; Hawkins, Melanie

    2012-03-16

    Increasingly, evidence-based health information, in particular evidence from systematic reviews, is being made available to lay audiences, in addition to health professionals. Research efforts have focused on different formats for the lay presentation of health information. However, there is a paucity of data on how patients integrate evidence-based health information with other factors such as their preferences for information and experiences with information-seeking. The aim of this project is to explore how people with multiple sclerosis (MS) integrate health information with their needs, experiences, preferences and values and how these factors can be incorporated into an online resource of evidence-based health information provision for people with MS and their families. This project is an Australian-Italian collaboration between researchers, MS societies and people with MS. Using a four-stage mixed methods design, a model will be developed for presenting evidence-based health information on the Internet for people with MS and their families. This evidence-based health information will draw upon systematic reviews of MS interventions from The Cochrane Library. Each stage of the project will build on the last. After conducting focus groups with people with MS and their family members (Stage 1), we will develop a model for summarising and presenting Cochrane MS reviews that is integrated with supporting information to aid understanding and decision making. This will be reviewed and finalised with people with MS, family members, health professionals and MS Society staff (Stage 2), before being uploaded to the Internet and evaluated (Stages 3 and 4). This project aims to produce accessible and meaningful evidence-based health information about MS for use in the varied decision making and management situations people encounter in everyday life. It is expected that the findings will be relevant to broader efforts to provide evidence-based health information for

  15. Stable Isotope Signatures of Carbon and Nitrogen to Characterize Exchange Processes and Their Use for Restoration Projects along the Austrian Danube

    Hein, T. [Wasser Cluster Lunz, Lunz-See and Institute of Hydrobiology and Aquatic Ecosystem Management, University for Natural Resources and Life Sciences, Vienna, (Austria); Bondar-Kunze, E. [University of Natural Resources and Applied Life Sciences, Vienna (Austria); Welti, N. [Institute of Hydrobiology and Aquatic Ecosystem Management, Vienna (Austria)

    2013-05-15

    The size and composition of an organic matter pool and its sources is a fundamental ecosystem property of river networks. River ecosystems are known to receive large amounts of terrestrial organic matter from catchments, still the question is to what extent aquatic sources influence riverine food webs or at least some components of these food webs. To identify different sources and their potential biological availability at the ecosystem level, we propose using stable isotope signatures of carbon and nitrogen and their respective elemental ratios. In this study, we used these parameters to evaluate river restoration measures. The target of the restoration was to improve surface connectivity between the main channel of the Danube downstream from Vienna and a side arm system within a floodplain. Analyses of the natural abundance of stable isotopes revealed that the restored side arm system showed distinct differences in the particulate organic matter pool in relation to hydrological connectivity. At low water levels, aquatic sources dominate in the side arm system, while at high water levels riverine organic matter is the dominating source. At medium connectivity levels aquatic sources also prevail in the side arm, thus an export of bio-available organic matter into the main channel can be expected. Based on these measurements, the increased - but hydrologically controlled - phytoplankton production was assessed and through this information, changes in ecosystem function were evaluated. (author)

  16. Referral for secondary restorative dental care in rural and urban areas of Scotland: findings from the Highlands Et Islands Teledentistry Project.

    Nuttall, N M; Steed, M S; Donachie, M A

    2002-02-23

    To compare the reported level of use of secondary care services for restorative dental care in rural and urban areas of Scotland. Postal questionnaire survey Postal questionnaire sent to all dentists in the Highland region, the island regions in Scotland and Dumfries Et Galloway (n = 150) and an equal number were sampled from the remainder of Scotland stratified by health board area. Non-respondents were sent 2 reminders after which 62% of the sample had responded. Most dentists (85%) who practised in what they considered were urban areas of Scotland said they felt that they had good access to a secondary referral service. Whereas most of those who practised in what they considered were rural areas either said they had no access to such a service (26%) or that access was difficult (53%), only 3% of those in urban areas said they had no access to a secondary restorative consultative service compared with 14% of dentists practising in rural areas of mainland Scotland and 54% of those practising on Scottish islands. The survey suggests the people of the Scottish islands and some of the remoter parts of the Scottish mainland would be among those who might benefit from improvement in access to a restorative dentistry consultant service.

  17. Shifting Restoration Policy to Address Landscape Change, Novel Ecosystems, and Monitoring

    Joy B. Zedler

    2012-12-01

    Full Text Available Policy to guide ecological restoration needs to aim toward minimizing the causes of ecosystem degradation; where causes cannot be eliminated or minimized, policy needs to shift toward accommodating irreversible landscape alterations brought about by climate change, nitrogen deposition, altered hydrology, degraded soil, and declining biodiversity. The degree to which lost diversity and ecosystem services can be recovered depends on the extent and nature of landscape change. For wetlands that occur at the base of watersheds that have been developed for agriculture or urban centers, the inflows of excess water, sediment, and nutrients can be permanent and can severely challenge efforts to restore historical services, including biodiversity support. In such cases, the historical state of downstream wetlands will not be completely restorable. Wetland restoration policy should promote watershed planning, wherein wetland and upland restoration is prioritized to achieve multiple, specific ecosystem services. For downstream wetlands, it is realistic to aim to enhance nitrogen removal and to establish native plants that are matrix dominants, namely, those that facilitate rather than displace other natives. More ambitious objectives such as maximizing diversity would be suitable for less-altered, upstream wetlands. Policy should also call for adaptive restoration and long-term assessments. For large sites and multiple sites of a given wetland type within a region, experimental tests can determine a wetland's ability to support high levels of ecosystem services. Once projects are underway, long-term monitoring of structural and functional indicators can characterize progress toward each objective. Managers can then learn which targets are unachievable based on data, not just opinion. Where an experimental treatment shows limited progress, practitioners would shift to more promising treatments and targets, thereby adapting restoration efforts to changing

  18. Projections of summertime ozone concentration over East Asia under multiple IPCC SRES emission scenarios

    Lee, Jae-Bum; Cha, Jun-Seok; Hong, Sung-Chul; Choi, Jin-Young; Myoung, Ji-Su; Park, Rokjin J.; Woo, Jung-Hun; Ho, Changhoi; Han, Jin-Seok; Song, Chang-Keun

    2015-04-01

    We have developed the Integrated Climate and Air Quality Modeling System (ICAMS) through the one-way nesting of global-regional models to examine the changes in the surface ozone concentrations over East Asia under future climate scenarios. Model simulations have been conducted for the present period of 1996-2005 to evaluate the performance of ICAMS. The simulated surface ozone concentrations reproduced the observed monthly mean concentrations at sites in East Asia with high R2 values (0.4-0.9), indicating a successful simulation to capture both spatial and temporal variability. We then performed several model simulations with the six IPCC SRES scenarios (A2, A1B, A1FI, A1T, B1, and B2) for the next three periods, 2016-2025 (the 2020s), 2046-2055 (the 2050s), and 2091-2100 (the 2090s). The model results show that the projected changes of the annual daily mean maximum eight-hour (DM8H) surface ozone concentrations in summertime for East Asia are in the range of 2-8 ppb, -3 to 8 ppb, and -7 to 9 ppb for the 2020s, the 2050s, and the 2090s, respectively, and are primarily determined based on the emission changes of NOx and NMVOC. The maximum increases in the annual DM8H surface ozone and high-ozone events occur in the 2020s for all scenarios except for A2, implying that the air quality over East Asia is likely to get worse in the near future period (the 2020s) than in the far future periods (the 2050s and the 2090s). The changes in the future environment based on IPCC SRES scenarios would also influence the change in the occurrences of high-concentrations events more greatly than that of the annual DM8H surface ozone concentrations. Sensitivity simulations show that the emissions increase is the key factor in determining future regional surface ozone concentrations in the case of a developing country, China, whereas a developed country, Japan would be influenced more greatly by effects of the regional climate change than the increase in emissions.

  19. Requirements Verification Report AN Farm to 200E Waste Transfer System for Project W-314, Tank Farm Restoration and Safe Operations

    MCGREW, D.L.

    1999-01-01

    This Requirements Verification Report (RVR) for Project W-314 ''AN Farm to 200E Waste Transfer System'' package provides documented verification of design compliance to all the applicable Project Development Specification (PDS) requirements. Additional PDS requirements verification will be performed during the project's procurement, construction, and testing phases, and the RVR will be updated to reflect this information as appropriate

  20. Societal Drivers of European Water Governance: A Comparison of Urban River Restoration Practices in France and Germany

    Aude Zingraff-Hamed

    2017-03-01

    Full Text Available The European water governance took a decisive turn with the formulation of the Water Framework Directive (WFD, which demands the restoration of all water bodies that did not achieve sufficient ecological status. Urban rivers are particularly impaired by human activities and their restorations are motivated by multiple ecological and societal drivers, such as requirements of laws and legislation, and citizen needs for a better quality of life. In this study we investigated the relative influence of socio-political and socio-cultural drivers on urban river restorations by comparing projects of different policy contexts and cultural norms to cross-fertilize knowledge. A database of 75 projects in French and German major cities was compiled to apply (a a comparative statistical analysis of main project features, i.e., motivation, goals, measures, morphological status, and project date; and (b a qualitative textual analysis on project descriptions and titles. The results showed that despite a powerful European directive, urban river restoration projects still keep national specificities. The WFD drives with more intensity German, rather than French, urban river restoration. This study showed the limits of macro-level governance and the influence of microlevel governance driven by societal aspects such as nature perception and relationships between humans and rivers.

  1. The cost and feasibility of marine coastal restoration.

    Bayraktarov, Elisa; Saunders, Megan I; Abdullah, Sabah; Mills, Morena; Beher, Jutta; Possingham, Hugh P; Mumby, Peter J; Lovelock, Catherine E

    2016-06-01

    Land-use change in the coastal zone has led to worldwide degradation of marine coastal ecosystems and a loss of the goods and services they provide. Restoration is the process of assisting the recovery of an ecosystem that has been degraded, damaged, or destroyed and is critical for habitats where natural recovery is hindered. Uncertainties about restoration cost and feasibility can impede decisions on whether, what, how, where, and how much to restore. Here, we perform a synthesis of 235 studies with 954 observations from restoration or rehabilitation projects of coral reefs, seagrass, mangroves, salt-marshes, and oyster reefs worldwide, and evaluate cost, survival of restored organisms, project duration, area, and techniques applied. Findings showed that while the median and average reported costs for restoration of one hectare of marine coastal habitat were around US$80000 (2010) and US$1600000 (2010), respectively, the real total costs (median) are likely to be two to four times higher. Coral reefs and seagrass were among the most expensive ecosystems to restore. Mangrove restoration projects were typically the largest and the least expensive per hectare. Most marine coastal restoration projects were conducted in Australia, Europe, and USA, while total restoration costs were significantly (up to 30 times) cheaper in countries with developing economies. Community- or volunteer-based marine restoration projects usually have lower costs. Median survival of restored marine and coastal organisms, often assessed only within the first one to two years after restoration, was highest for saltmarshes (64.8%) and coral reefs (64.5%) and lowest for seagrass (38.0%). However, success rates reported in the scientific literature could be biased towards publishing successes rather than failures. The majority of restoration projects were short-lived and seldom reported monitoring costs. Restoration success depended primarily on the ecosystem, site selection, and techniques

  2. Impact of stream restoration on flood waves

    Sholtes, J.; Doyle, M.

    2008-12-01

    Restoration of channelized or incised streams has the potential to reduce downstream flooding via storing and dissipating the energy of flood waves. Restoration design elements such as restoring meanders, reducing slope, restoring floodplain connectivity, re-introducing in-channel woody debris, and re-vegetating banks and the floodplain have the capacity to attenuate flood waves via energy dissipation and channel and floodplain storage. Flood discharge hydrographs measured up and downstream of several restored reaches of varying stream order and located in both urban and rural catchments are coupled with direct measurements of stream roughness at various stages to directly measure changes to peak discharge, flood wave celerity, and dispersion. A one-dimensional unsteady flow routing model, HEC-RAS, is calibrated and used to compare attenuation characteristics between pre and post restoration conditions. Modeled sensitivity results indicate that a restoration project placed on a smaller order stream demonstrates the highest relative reduction in peak discharge of routed flood waves compared to one of equal length on a higher order stream. Reductions in bed slope, extensions in channel length, and increases in channel and floodplain roughness follow restoration placement with the watershed in relative importance. By better understanding how design, scale, and location of restored reaches within a catchment hydraulically impact flood flows, this study contributes both to restoration design and site decision making. It also quantifies the effect of reach scale stream restoration on flood wave attenuation.

  3. Mechanical site preparation for forest restoration

    Magnus Lof; Daniel C. Dey; Rafael M. Navarro; Douglass F. Jacobs

    2012-01-01

    Forest restoration projects have become increasingly common around the world and planting trees is almost always a key component. Low seedling survival and growth may result in restoration failures and various mechanical site preparation techniques for treatment of soils and vegetation are important tools used to help counteract this. In this article, we synthesize the...

  4. Design and Analysis of Salmonid Tagging Studies in the Columbia Basin : Evaluating Wetland Restoration Projects in the Columbia River Estuary using Hydroacoustic Telemetry Arrays to Estimate Movement, Survival, and Residence Times of Juvenile Salmonids, Volume XXII (22).

    Perry, Russell W.; Skalski, John R.

    2008-08-01

    Wetlands in the Columbia River estuary are actively being restored by reconnecting these habitats to the estuary, making more wetland habitats available to rearing and migrating juvenile salmon. Concurrently, thousands of acoustically tagged juvenile salmonids are released into the Columbia River to estimate their survival as they migrate through the estuary. Here, we develop a release-recapture model that makes use of these tagged fish to measure the success of wetland restoration projects in terms of their contribution to populations of juvenile salmon. Specifically, our model estimates the fraction of the population that enter the wetland, survival within the wetland, and the mean residence time of fish within the wetland. Furthermore, survival in mainstem Columbia River downstream of the wetland can be compared between fish that remained the mainstem and entered the wetland. These conditional survival estimates provide a means of testing whether the wetland improves the subsequent survival of juvenile salmon by fostering growth or improving their condition. Implementing such a study requires little additional cost because it takes advantage of fish already released to estimate survival through the estuary. Thus, such a study extracts the maximum information at minimum cost from research projects that typically cost millions of dollars annually.

  5. Technical approach to groundwater restoration

    1993-01-01

    The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) and minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures

  6. Development, Testing, and Application of a Coupled Hydrodynamic Surface-Water/Groundwater Model (FTLOADDS) with Heat and Salinity Transport in the Ten Thousand Islands/Picayune Strand Restoration Project Area, Florida

    Swain, Eric D.; Decker, Jeremy D.

    2009-01-01

    A numerical model application was developed for the coastal area inland of the Ten Thousand Islands (TTI) in southwestern Florida using the Flow and Transport in a Linked Overland/Aquifer Density-Dependent System (FTLOADDS) model. This model couples a two-dimensional dynamic surface-water model with a three-dimensional groundwater model, and has been applied to several locations in southern Florida. The model application solves equations for salt transport in groundwater and surface water, and also simulates surface-water temperature using a newly enhanced heat transport algorithm. One of the purposes of the TTI application is to simulate hydrologic factors that relate to habitat suitability for the West Indian Manatee. Both salinity and temperature have been shown to be important factors for manatee survival. The inland area of the TTI domain is the location of the Picayune Strand Restoration Project, which is designed to restore predevelopment hydrology through the filling and plugging of canals, construction of spreader channels, and the construction of levees and pump stations. The effects of these changes are simulated to determine their effects on manatee habitat. The TTI application utilizes a large amount of input data for both surface-water and groundwater flow simulations. These data include topography, frictional resistance, atmospheric data including rainfall and air temperature, aquifer properties, and boundary conditions for tidal levels, inflows, groundwater heads, and salinities. Calibration was achieved by adjusting the parameters having the largest uncertainty: surface-water inflows, the surface-water transport dispersion coefficient, and evapotranspiration. A sensitivity analysis did not indicate that further parameter changes would yield an overall improvement in simulation results. The agreement between field data from GPS-tracked manatees and TTI application results demonstrates that the model can predict the salinity and temperature

  7. Riparian forest restoration: Conflicting goals, trade-offs, and measures of success

    Heather L. Bateman; David M. Merritt; J. Bradley Johnson

    2012-01-01

    Restoration projects can have varying goals, depending on the specific focus, rationale, and aims for restoration. When restoration projects use project-specific goals to define activities and gauge success without considering broader ecological context, determination of project implications and success can be confounding. We used case studies from the Middle Rio...

  8. Presenting evidence-based health information for people with multiple sclerosis: the IN-DEEP project protocol

    Hill Sophie

    2012-03-01

    Full Text Available Abstract Background Increasingly, evidence-based health information, in particular evidence from systematic reviews, is being made available to lay audiences, in addition to health professionals. Research efforts have focused on different formats for the lay presentation of health information. However, there is a paucity of data on how patients integrate evidence-based health information with other factors such as their preferences for information and experiences with information-seeking. The aim of this project is to explore how people with multiple sclerosis (MS integrate health information with their needs, experiences, preferences and values and how these factors can be incorporated into an online resource of evidence-based health information provision for people with MS and their families. Methods This project is an Australian-Italian collaboration between researchers, MS societies and people with MS. Using a four-stage mixed methods design, a model will be developed for presenting evidence-based health information on the Internet for people with MS and their families. This evidence-based health information will draw upon systematic reviews of MS interventions from The Cochrane Library. Each stage of the project will build on the last. After conducting focus groups with people with MS and their family members (Stage 1, we will develop a model for summarising and presenting Cochrane MS reviews that is integrated with supporting information to aid understanding and decision making. This will be reviewed and finalised with people with MS, family members, health professionals and MS Society staff (Stage 2, before being uploaded to the Internet and evaluated (Stages 3 and 4. Discussion This project aims to produce accessible and meaningful evidence-based health information about MS for use in the varied decision making and management situations people encounter in everyday life. It is expected that the findings will be relevant to broader

  9. Habitat Analysis - Trinity River Restoration Potential

    National Oceanic and Atmospheric Administration, Department of Commerce — The goal of the Trinity River project is to identify the potential positive effects of large-scale restoration actions in a 63 kilometer reach of the Trinity River...

  10. Geomorphic Analysis - Trinity River Restoration Potential

    National Oceanic and Atmospheric Administration, Department of Commerce — The goal of the Trinity River project is to identify the potential positive effects of large-scale restoration actions in a 63 kilometer reach of the Trinity River...

  11. Methodology for the selection of routes for international cross-border line projects involving multiple objectives and decision-makers in the analyses of restrictions and environmental possibilities

    Angel S, Enrique; Cadena, Luis Fernando

    2005-01-01

    A scheme was developed and applied to select the optimum environmental route for international cross-border line projects, in a decision making context involving multiple objectives and multiple decision-makers, the project studied was the electricity interconnection for central America (SIEPAC) for which a prospective assessment was carried out regarding the restrictions and possibilities in the light of the Colombian environmental dimensions management model. The methodology proposed followed these stages: Definition and approval of the structure of environmental restriction and criticality variables, sectorization and selection of complex sections, definition of decision-makers for multi-objective analysis; design and application of consultation tool; definition and modeling of options applying SIG; sensitivity analysis of alternative routes and project's environment management. Different options were identified for insertion and permanence of the project according to the criteria of various interest groups and actors consulted: environmental authorities, electricity companies, scientific community and civil society

  12. Ten-Year Summary and Evaluation of Operations and Performance of the Utica Aquifer and North Lake Basin Wetlands Restoration Project, 2004-2014

    LaFreniere, Lorraine M. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-11-01

    This document reviews the performance of the groundwater (and wetlands) restoration program implemented by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Utica, Nebraska, during the first ten years of this initiative (2004-2014). The results of the program for the first five-year period of operation were previously discussed in detail (Argonne 2011). The present report focuses on treatment system operational data and regulatory compliance monitoring results for the site during the second five-year period of operation (2010-2014), together with the results of (1) ongoing monitoring and (2) targeted groundwater sampling for volatile organic compounds (VOCs) analyses conducted at Utica in 2015 (following completion of the tenth year of systems operation), to assess the 10-year progress of the Utica remediation effort.

  13. Cost-benefit analysis of wetland restoration

    Dubgaard, Alex

    2004-01-01

    The purpose of cost-benefit analysis (CBA) is to identify value for money solutions to government policies or projects. Environmental policy appraisal is typically complicated by the fact that thre are a number of feasible solutions to a decision problem - each yielding a different mix of environ...... is to illustrate the application of CBA within the field of river restoration. The Skjern River restoration project in Denmark is used as an empirical example of how these methods can be applied in the wetland restoration context....

  14. Coral Reef Ecosystem Data from the 2010-2011 Kahekili Herbivore Fisheries Management Area, West Maui, Herbivore Enhancement as a Tool for Reef Restoration Project (NODC Accession 0082869)

    National Oceanic and Atmospheric Administration, Department of Commerce — This research targets the Hawaii Coral Reef Initiative (HCRI) Priority Area A: Kahekili, Maui: Herbivore Fisheries Management Area (KHFMA). The project goal was to...

  15. The Ecosystem Functions Model: A Tool for Restoration Planning

    Hickey, John T; Dunn, Chris N

    2004-01-01

    .... Project teams can use the EFM to visualize existing ecologic conditions, highlight promising restoration sites, and assess and rank alternatives according to the relative enhancement (or decline...

  16. Minimizing waste in environmental restoration

    Thuot, J.R.; Moos, L.

    1996-01-01

    Environmental restoration, decontamination and decommissioning, and facility dismantlement projects are not typically known for their waste minimization and pollution prevention efforts. Typical projects are driven by schedules and milestones with little attention given to cost or waste minimization. Conventional wisdom in these projects is that the waste already exists and cannot be reduced or minimized; however, there are significant areas where waste and cost can be reduced by careful planning and execution. Waste reduction can occur in three ways: beneficial reuse or recycling, segregation of waste types, and reducing generation of secondary waste

  17. The responsibility of business enterprises to restore access to essential public service at resettlement sites

    van der Ploeg, Lidewij; Vanclay, Francis; Lourenço, Ivo; Hesselman, Marlies; Hallo de Wolf, Antenor; Toebes, Brigit

    2017-01-01

    This chapter examines the provision of essential public services in resettlement sites associated with project induced displacement. Restoring and improving access to essential public services in resettlement sites is an important aspect of livelihood restoration of affected peoples. Project

  18. Projectables

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  19. Project management plan for inactive tanks 3001-B, 3004-B, 3013, and T-30 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    1995-07-01

    *This document identifies the roles and responsibilities of the project team members and identifies the project scope, schedule, and cost reporting activities for a maintenance activity to remove and dispose of three inactive liquid low-level radioactive waste (LLLW) system tanks and to isolate and fill one LLLW tank with grout. Tanks 3001-B, 3004-B, and T-30 are located in concrete vaults and tank 3013 is buried directly in the soil. The maintenance project consists of cutting the existing pipes attached to the tanks; capping the piping to be left in place; removing the tanks and filling the vaults with grout for tanks 3001-B, 3004-B, and T-30; and filling tank 3013 with grout. Because the LLLW line serving tank 3001-B will be needed for discharging the 3001 canal demineralizer back flush and regeneration waste to tank WC-19, tank 3001-B will be replaced with a section of piping

  20. Methodology for ranking restoration options

    Hedemann Jensen, Per

    1999-04-01

    The work described in this report has been performed as a part of the RESTRAT Project FI4P-CT95-0021a (PL 950128) co-funded by the Nuclear Fission Safety Programme of the European Commission. The RESTRAT project has the overall objective of developing generic methodologies for ranking restoration techniques as a function of contamination and site characteristics. The project includes analyses of existing remediation methodologies and contaminated sites, and is structured in the following steps: characterisation of relevant contaminated sites; identification and characterisation of relevant restoration techniques; assessment of the radiological impact; development and application of a selection methodology for restoration options; formulation of generic conclusions and development of a manual. The project is intended to apply to situations in which sites with nuclear installations have been contaminated with radioactive materials as a result of the operation of these installations. The areas considered for remedial measures include contaminated land areas, rivers and sediments in rivers, lakes, and sea areas. Five contaminated European sites have been studied. Various remedial measures have been envisaged with respect to the optimisation of the protection of the populations being exposed to the radionuclides at the sites. Cost-benefit analysis and multi-attribute utility analysis have been applied for optimisation. Health, economic and social attributes have been included and weighting factors for the different attributes have been determined by the use of scaling constants. (au)

  1. Five-year summary and evaluation of operations and performance of the Utica aquifer and North Lake Basin Wetlands restoration project in 2004-2009.

    LaFreniere, L. M. (Environmental Science Division)

    2011-09-13

    This document reviews the performance of the groundwater (and wetlands) restoration program implemented by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Utica, Nebraska, during the first five years (2004-2009) of this initiative. The report summarizes treatment system operational data and regulatory compliance monitoring results for the site during this period, together with the results of the targeted groundwater sampling and analysis for volatile organic compounds (VOCs) conducted in early 2010 (following completion of the fifth year of systems operation), to assess the initial five years of progress of the Utica remediation effort. On the basis of the 2003 groundwater sampling results, a remedial system employing 4 extraction wells (GWEX1-GWEX4), with groundwater treatment by spray irrigation and conventional air stripping, was implemented with the concurrence of the CCC/USDA and the agencies (Table 1.1). The principal components of the system are shown in Figure 1.3 and are briefly described in Section 1.2. Operation of well GWEX4 and the associated air stripper began on October 29, 2004, and routine operation of wells GWEX1-GWEX3 and the spray irrigation treatment units began on November 22, 2004.

  2. Joint analysis of stressors and ecosystem services to enhance restoration effectiveness.

    Allan, J David; McIntyre, Peter B; Smith, Sigrid D P; Halpern, Benjamin S; Boyer, Gregory L; Buchsbaum, Andy; Burton, G A; Campbell, Linda M; Chadderton, W Lindsay; Ciborowski, Jan J H; Doran, Patrick J; Eder, Tim; Infante, Dana M; Johnson, Lucinda B; Joseph, Christine A; Marino, Adrienne L; Prusevich, Alexander; Read, Jennifer G; Rose, Joan B; Rutherford, Edward S; Sowa, Scott P; Steinman, Alan D

    2013-01-02

    With increasing pressure placed on natural systems by growing human populations, both scientists and resource managers need a better understanding of the relationships between cumulative stress from human activities and valued ecosystem services. Societies often seek to mitigate threats to these services through large-scale, costly restoration projects, such as the over one billion dollar Great Lakes Restoration Initiative currently underway. To help inform these efforts, we merged high-resolution spatial analyses of environmental stressors with mapping of ecosystem services for all five Great Lakes. Cumulative ecosystem stress is highest in near-shore habitats, but also extends offshore in Lakes Erie, Ontario, and Michigan. Variation in cumulative stress is driven largely by spatial concordance among multiple stressors, indicating the importance of considering all stressors when planning restoration activities. In addition, highly stressed areas reflect numerous different combinations of stressors rather than a single suite of problems, suggesting that a detailed understanding of the stressors needing alleviation could improve restoration planning. We also find that many important areas for fisheries and recreation are subject to high stress, indicating that ecosystem degradation could be threatening key services. Current restoration efforts have targeted high-stress sites almost exclusively, but generally without knowledge of the full range of stressors affecting these locations or differences among sites in service provisioning. Our results demonstrate that joint spatial analysis of stressors and ecosystem services can provide a critical foundation for maximizing social and ecological benefits from restoration investments.

  3. Oyster reef restoration supports increased nekton biomass and potential commercial fishery value

    Austin T. Humphries

    2015-08-01

    Full Text Available Across the globe, discussions centered on the value of nature drive many conservation and restoration decisions. As a result, justification for management activities increasingly asks for two lines of evidence: (1 biological proof of augmented ecosystem function or service, and (2 monetary valuation of these services. For oyster reefs, which have seen significant global declines and increasing restoration work, the need to provide both biological and monetary evidence of reef services on a local-level has become more critical in a time of declining resources. Here, we quantified species biomass and potential commercial value of nekton collected from restored oyster (Crassostrea virginica reefs in coastal Louisiana over a 3-year period, providing multiple snapshots of biomass support over time. Overall, and with little change over time, fish and invertebrate biomass is 212% greater at restored oyster reefs than mud-bottom, or 0.12 kg m−2. The additional biomass of commercial species is equivalent to an increase of local fisheries value by 226%, or $0.09 m−2. Understanding the ecosystem value of restoration projects, and how they interact with regional management priorities, is critical to inform local decision-making and provide testable predictions. Quantitative estimates of potential commercial fisheries enhancement by oyster reef restoration such as this one can be used directly by local managers to determine the expected return on investment.

  4. Individual mediodorsal thalamic neurons project to multiple areas of the rat prefrontal cortex: A single neuron-tracing study using virus vectors.

    Kuramoto, Eriko; Pan, Shixiu; Furuta, Takahiro; Tanaka, Yasuhiro R; Iwai, Haruki; Yamanaka, Atsushi; Ohno, Sachi; Kaneko, Takeshi; Goto, Tetsuya; Hioki, Hiroyuki

    2017-01-01

    The prefrontal cortex has an important role in a variety of cognitive and executive processes, and is generally defined by its reciprocal connections with the mediodorsal thalamic nucleus (MD). The rat MD is mainly subdivided into three segments, the medial (MDm), central (MDc), and lateral (MDl) divisions, on the basis of the cytoarchitecture and chemoarchitecture. The MD segments are known to topographically project to multiple prefrontal areas at the population level: the MDm mainly to the prelimbic, infralimbic, and agranular insular areas; the MDc to the orbital and agranular insular areas; and the MDl to the prelimbic and anterior cingulate areas. However, it is unknown whether individual MD neurons project to single or multiple prefrontal cortical areas. In the present study, we visualized individual MD neurons with Sindbis virus vectors, and reconstructed whole structures of MD neurons. While the main cortical projection targets of MDm, MDc, and MDl neurons were generally consistent with those of previous results, it was found that individual MD neurons sent their axon fibers to multiple prefrontal areas, and displayed various projection patterns in the target areas. Furthermore, the axons of single MD neurons were not homogeneously spread, but were rather distributed to form patchy axon arbors approximately 1 mm in diameter. The multiple-area projections and patchy axon arbors of single MD neurons might be able to coactivate cortical neuron groups in distant prefrontal areas simultaneously. Furthermore, considerable heterogeneity of the projection patterns is likely, to recruit the different sets of cortical neurons, and thus contributes to a variety of prefrontal functions. J. Comp. Neurol. 525:166-185, 2017. © 2016 Wiley Periodicals, Inc. © 2016 Wiley Periodicals, Inc.

  5. Communication in cross-cultural consultations in primary care in Europe: the case for improvement. The rationale for the RESTORE FP 7 project.

    van den Muijsenbergh, Maria; van Weel-Baumgarten, Evelyn; Burns, Nicola; O'Donnell, Catherine; Mair, Frances; Spiegel, Wolfgang; Lionis, Christos; Dowrick, Chris; O'Reilly-de Brún, Mary; de Brun, Tomas; MacFarlane, Anne

    2014-04-01

    The purpose of this paper is to substantiate the importance of research about barriers and levers to the implementation of supports for cross-cultural communication in primary care settings in Europe. After an overview of migrant health issues, with the focus on communication in cross-cultural consultations in primary care and the importance of language barriers, we highlight the fact that there are serious problems in routine practice that persist over time and across different European settings. Language and cultural barriers hamper communication in consultations between doctors and migrants, with a range of negative effects including poorer compliance and a greater propensity to access emergency services. It is well established that there is a need for skilled interpreters and for professionals who are culturally competent to address this problem. A range of professional guidelines and training initiatives exist that support the communication in cross-cultural consultations in primary care. However, these are commonly not implemented in daily practice. It is as yet unknown why professionals do not accept or implement these guidelines and interventions, or under what circumstances they would do so. A new study involving six European countries, RESTORE (REsearch into implementation STrategies to support patients of different ORigins and language background in a variety of European primary care settings), aims to address these gaps in knowledge. It uses a unique combination of a contemporary social theory, normalisation process theory (NPT) and participatory learning and action (PLA) research. This should enhance understanding of the levers and barriers to implementation, as well as providing stakeholders, with the opportunity to generate creative solutions to problems experienced with the implementation of such interventions.

  6. Restoration of Gooseberry Creek

    Jonathan W. Long

    2000-01-01

    Grazing exclusion and channel modifications were used to restore wet meadows along a stream on the Fort Apache Indian Reservation. The efforts are reestablishing functional processes to promote long-term restoration of wetland health and species conservation.

  7. The socioeconomic factors that facilitate or constrain restoration management: Watershed rehabilitation and wet meadow (bofedal) restoration in the Bolivian Andes.

    Hartman, Brett D; Cleveland, David A

    2018-03-01

    Restoration ecology holds promise for addressing land degradation in impoverished rural environments, provided the approach is adapted to rural development settings. While there is a need for increased integration of social dynamics in land restoration, few systematic studies exist. We explored the socioeconomic factors that influence restoration management, including local motives and perceived benefits, incentives, land tenancy, institutional factors, conflict resolution, accessibility, off-farm labor, and outmigration. The study area is a successful watershed rehabilitation and wet meadow restoration project in the Bolivian Andes that began in 1992. We used household survey methods (n = 237) to compare the communities that had conducted the most restoration management with those that had conducted the least. Results suggest that several factors facilitate investments in land restoration, including aligning restoration objectives with local motives and perceived benefits, ensuring incentives are in place to stimulate long-term investments, conflict resolution, private land tenancy, and accessibility. However, higher levels of organization and active leadership can facilitate land restoration on communal lands. Increased livelihood benefits from land restoration helped slow the rate of rural to urban migration, with 24.5% outmigration in the highest restoration management communities compared to 62.1% in the lowest restoration management communities. Results suggest that land restoration projects that integrate community development into project planning and implementation will achieve greater success. Copyright © 2017 Elsevier Ltd. All rights reserved.

  8. Global Ecosystem Restoration Index

    Fernandez, Miguel; Garcia, Monica; Fernandez, Nestor

    2015-01-01

    The Global ecosystem restoration index (GERI) is a composite index that integrates structural and functional aspects of the ecosystem restoration process. These elements are evaluated through a window that looks into a baseline for degraded ecosystems with the objective to assess restoration...

  9. Weaver Bottoms Wildlife Habitat Restoration: A Case Study

    Davis, Mary M; Damberg, Carol

    1994-01-01

    .... The Weaver Bottoms Rehabilitation Project is a large scale wetland restoration project that is directed at regaining lost habitat by creating hydrological and energy conditions conducive to marsh growth and production. Davis et al. (1993...

  10. Linking restoration ecology with coastal dune restoration

    Lithgow, D.; Martínez, M. L.; Gallego-Fernández, J. B.; Hesp, P. A.; Flores, P.; Gachuz, S.; Rodríguez-Revelo, N.; Jiménez-Orocio, O.; Mendoza-González, G.; Álvarez-Molina, L. L.

    2013-10-01

    Restoration and preservation of coastal dunes is urgently needed because of the increasingly rapid loss and degradation of these ecosystems because of many human activities. These activities alter natural processes and coastal dynamics, eliminate topographic variability, fragment, degrade or eliminate habitats, reduce diversity and threaten endemic species. The actions of coastal dune restoration that are already taking place span contrasting activities that range from revegetating and stabilizing the mobile substrate, to removing plant cover and increasing substrate mobility. Our goal was to review how the relative progress of the actions of coastal dune restoration has been assessed, according to the ecosystem attributes outlined by the Society of Ecological Restoration: namely, integrity, health and sustainability and that are derived from the ecological theory of succession. We reviewed the peer reviewed literature published since 1988 that is listed in the ISI Web of Science journals as well as additional references, such as key books. We exclusively focused on large coastal dune systems (such as transgressive and parabolic dunefields) located on natural or seminatural coasts. We found 150 articles that included "coastal dune", "restoration" and "revegetation" in areas such as title, keywords and abstract. From these, 67 dealt specifically with coastal dune restoration. Most of the studies were performed in the USA, The Netherlands and South Africa, during the last two decades. Restoration success has been assessed directly and indirectly by measuring one or a few ecosystem variables. Some ecosystem attributes have been monitored more frequently (ecosystem integrity) than others (ecosystem health and sustainability). Finally, it is important to consider that ecological succession is a desirable approach in restoration actions. Natural dynamics and disturbances should be considered as part of the restored system, to improve ecosystem integrity, health and

  11. Current Concepts in Restorative Implant Dentistry

    Prof.Marchack

    2009-01-01

    Patients today are incteasingly aware of dental implants.and their expectations are for esthetically and functionally pleasingimplant restorations that mimic natural teeth.This presentation will give both the experienced and novice practitioner a better understand-ing of how restorative implant dentistry has evolved.Treatment planning and restorative options for single implants.multiple implants andfully edentulons arches will be discussed,and the use of modern materials and CADCAM technology in fabricating the most contemporaryfixed implant supported prostheses will be demonstrated.

  12. A criteria and indicators monitoring framework for food forestry embedded in the principles of ecological restoration.

    Park, Hyeone; Higgs, Eric

    2018-02-02

    Food forestry is a burgeoning practice in North America, representing a strong multifunctional approach that combines agriculture, forestry, and ecological restoration. The Galiano Conservancy Association (GCA), a community conservation, restoration, and educational organization on Galiano Island, British Columbia in Canada, recently has created two food forests on their protected forested lands: one with primarily non-native species and the other comprising native species. These projects, aimed at food production, education, and promotion of local food security and sustainability, are also intended to contribute to the overall ecological integrity of the landscape. Monitoring is essential for assessing how effectively a project is meeting its goal and thus informing its adaptive management. Yet, presently, there are no comprehensive monitoring frameworks for food forestry available. To fill this need, this study developed a generic Criteria and Indicators (C&I) monitoring framework for food forestry, embedded in ecological restoration principles, by employing qualitative content analysis of 61 literature resources and semi-structured interviews with 16 experts in the fields of food forestry and ecological restoration. The generic C&I framework comprises 14 criteria, 39 indicators, and 109 measures and is intended to guide a comprehensive and systematic assessment for food forest projects. The GCA adapted the generic C&I framework to develop a customized monitoring framework. The Galiano C&I monitoring framework has comprehensive suite of monitoring parameters, which are collectively address multiple values and goals.

  13. Hydrology of Dutch Cirsio-Molinietum meadows : Prospects for restoration

    Jansen, A. J. M.; Grootjans, A. P.; Jalink, M. H.; Bakker, J.P.

    . Fen meadows (Cirsio dissecti-Molinietum) are seriously threatened by desiccation, acidification and eutro-phication. In The Netherlands several projects were launched to restore damaged fen meadows. This review describes how successes and failures of these restoration projects depend on

  14. Sex and the single Salix: considerations for riparian restoration

    Thomas D. Landis; David R. Dreesen; R. Kasten Dumroese

    2003-01-01

    Most restoration projects strive to create a sustain able plant community but exclusive use of vegetatively propagated material may be preventing this goal. The dioecious willows and cottonwoods of the Salicaceae are widely used in riparian restoration projects. Hardwood cuttings have traditionally been used to propagate these species in nurseries, and live stakes,...

  15. Contribuição da fauna silvestre em projetos de restauração ecológica no Brasil Contribution of the wildlife in ecological restoration projects in Brazil

    Wanuza Helena Campos

    2012-12-01

    Full Text Available O sucesso no processo de restauração e manutenção da dinâmica de um ecossistema é extremamente dependente da capacidade das espécies em promover interações interespecíficas entre as diversas formas de vida. Estas interações criam um cenário favorável à restauração ecológica de ecossistemas degradados. Assim, por meio de revisão de literatura, o objetivo deste trabalho é relatar a contribuição e utilização dos diferentes grupos de animais na execução de projetos de restauração ecológica no Brasil. As aves e mamíferos frugívoros e também outros animais, como os répteis, peixes e insetos, têm se destacado como ferramentas de auxílio aos projetos de restauração ecológica. As técnicas para atração de animais e consequente chegada de propágulos em um ecossistema degradado compreende a utilização de poleiros, que servem de pouso e abrigo para a avifauna e morcegos, e a utilização de abrigos artificiais, que servem para fuga de predadores, descanso e reprodução dos animais. De modo geral, estes estudos são excelentes ferramentas para gerir ações de manejo ambiental em ecossistemas degradados, possibilitando a recuperação da biodiversidade destes ambientes. The success in the process of restoration and maintenance of the dynamics of an ecosystem is highly dependent on the capacity of species to promote interspecific interactions among the various life forms. These interactions create a favorable environment for the ecological restoration of degraded ecosystems. Thus, by review the literature, the objective of this study is to report the contribution and use of different animal groups in carrying out ecological restoration projects in Brazil. The fruit-eating birds and mammals and also other animals such as reptiles, fish and insects have been highlighted as tools to aid environmental ecological restoration projects. Techniques for attracting animals and consequent arrival of seedlings in a degraded

  16. How economics can further the success of ecological restoration.

    Iftekhar, Md Sayed; Polyakov, Maksym; Ansell, Dean; Gibson, Fiona; Kay, Geoffrey M

    2017-04-01

    Restoration scientists and practitioners have recently begun to include economic and social aspects in the design and investment decisions for restoration projects. With few exceptions, ecological restoration studies that include economics focus solely on evaluating costs of restoration projects. However, economic principles, tools, and instruments can be applied to a range of other factors that affect project success. We considered the relevance of applying economics to address 4 key challenges of ecological restoration: assessing social and economic benefits, estimating overall costs, project prioritization and selection, and long-term financing of restoration programs. We found it is uncommon to consider all types of benefits (such as nonmarket values) and costs (such as transaction costs) in restoration programs. Total benefit of a restoration project can be estimated using market prices and various nonmarket valuation techniques. Total cost of a project can be estimated using methods based on property or land-sale prices, such as hedonic pricing method and organizational surveys. Securing continuous (or long-term) funding is also vital to accomplishing restoration goals and can be achieved by establishing synergy with existing programs, public-private partnerships, and financing through taxation. © 2016 Society for Conservation Biology.

  17. Wetland restoration, flood pulsing, and disturbance dynamics

    Middleton, Beth A.

    1999-01-01

    While it is generally accepted that flood pulsing and disturbance dynamics are critical to wetland viability, there is as yet no consensus among those responsible for wetland restoration about how best to plan for those phenomena or even whether it is really necessary to do so at all. In this groundbreaking book, Dr. Beth Middleton draws upon the latest research from around the world to build a strong case for making flood pulsing and disturbance dynamics integral to the wetland restoration planning process.While the initial chapters of the book are devoted to laying the conceptual foundations, most of the coverage is concerned with demonstrating the practical implications for wetland restoration and management of the latest ecological theory and research. It includes a fascinating case history section in which Dr. Middleton explores the restoration models used in five major North American, European, Australian, African, and Asian wetland projects, and analyzes their relative success from the perspective of flood pulsing and disturbance dynamics planning.Wetland Restoration also features a wealth of practical information useful to all those involved in wetland restoration and management, including: * A compendium of water level tolerances, seed germination, seedling recruitment, adult survival rates, and other key traits of wetland plant species * A bibliography of 1,200 articles and monographs covering all aspects of wetland restoration * A comprehensive directory of wetland restoration ftp sites worldwide * An extensive glossary of essential terms

  18. Overcoming restoration paradigms: value of the historical record and metapopulation dynamics in native oyster restoration

    Romuald N. Lipcius

    2015-09-01

    Full Text Available Restoration strategies for native oyster populations rely on multiple sources of information, which often conflict due to time- and space-varying patterns in abundance and distribution. For instance, strategies based on population connectivity and disease resistance can differ, and extant and historical records of abundance and distribution are often at odds, such that the optimal strategy is unclear and valuable restoration sites may be excluded from consideration. This was the case for the Lynnhaven River subestuary of lower Chesapeake Bay, which was deemed unsuitable for Eastern Oyster restoration based on physical conditions, disease challenge, and extant oyster abundance. Consequently, we (i evaluated previously unknown historical data from the 1800s, (ii quantified extant oyster recruitment and abundance, physical conditions, and disease presence on constructed restoration reefs and alternative substrates, and (iii assessed simulations from biophysical models to identify potential restoration sites in the metapopulation. The collective data distinguished numerous restoration sites (i in the polyhaline zone (salinity 18.4-22.2 where disease resistance is evolving, (ii where oysters were abundant in the late 1800s-early 1900s, (iii of recent high recruitment, abundance and survival, despite consistent and elevated disease challenge, and (iv interconnected as a metapopulation via larval dispersal. Moreover, a network of constructed restoration reefs met size structure, abundance and biomass standards of restoration success. These findings demonstrate that assumptions about the suitability of sites for oyster restoration based on individual processes can be severely flawed, and that in-depth examination of multiple processes and sources of information are required for oyster reef restoration plans to maximize success. We use these findings and previous information to recommend a strategy for successful restoration of subtidal oyster reefs

  19. A quality improvement project to reduce the intraoperative use of single-dose fentanyl vials across multiple patients in a pediatric institution.

    Buck, David; Subramanyam, Rajeev; Varughese, Anna

    2016-01-01

    The use of a single-dose vial across multiple patients presents a risk to sterility and is against CDC guidelines. We initiated a quality improvement (QI) project to reduce the intraoperative use of single-dose vials of fentanyl across multiple patients at Cincinnati Children's Hospital Medical Center (CCHMC). The initial step of the improvement project was the development of a Key Driver Diagram. The diagram has the SMART aim of the project, key drivers inherent to the process we are trying to improve, and specific interventions targeting the key drivers. The number of patients each week receiving an IV dose of fentanyl, from a vial previously accessed for another patient was tracked in a high turnover operating room (OR). The improvement model used was based on the concept of building Plan-Do-Study-Act (PDSA) cycles. Tests of change included provider education, provision of an increased number of fentanyl vials, alternate wasting processes, and provision of single-use fentanyl syringes by the pharmacy. Prior to initiation of this project, it was common for a single fentanyl vial to be accessed for multiple patients. Our data showed an average percentage of failures of just over 50%. During the end of the project, after 7 months, the mean percentage failures had dropped to 5%. Preparation of 20 mcg single-use fentanyl syringes by pharmacy, combined with education of providers on appropriate use, was successful in reducing failures to below our goal of 25%. Appropriately sized fentanyl syringes prepared by pharmacy, education on correct use of single-dose vials, and reminders in the OR, reduced the percentage of patients receiving a dose of fentanyl from a vial previously accessed for another patient in a high-volume otolaryngology room. © 2015 John Wiley & Sons Ltd.

  20. Environmental restoration and biological contamination: ecological and legal aspects

    Ademir Reis

    2005-05-01

    Full Text Available Environmental restoration is a pressing current need. However, protected areas have been exposed to biological contamination risks because the traditional techniques of restoration frequently use exotic species. This causes some concern, since biological contamination is the second major cause of species extinction in the world. It is important to use only native species in restoration projects in order to promote an effective environmental restoration without the risk of contamination. This paper discusses some issues concerning environmental restoration, biological contamination and the need for clearer laws.

  1. The First Results of the Project on Restoration of Genetic Diversity of the Saker Falcon Populations in the Altai-Sayan Region, Russia

    Igor V. Karyakin

    2018-03-01

    Full Text Available On summer 2017 a pilot project on population recovery of Saker Falcon (Falco cherrug was conducted in Altai-Sayan region of Russia. Ten 20-days old falcons of “Altaic” morph from a breeding center were placed in nests of wild falcons of other color morphs. Sequence of control region (D-loop of mitochondrial genome from 414 to 1417 bp (1004 bp proofed that in particular cases haplotypes of non-native nestlings from the breeding center were similar to those of native falcons that acted as adoptive parents. Analysis also revealed that haplotypes of nestlings matched the previously determined western and eastern haplogroups. Ten nestlings from a breeding center were placed in 6 nests of wild Sakers with 24 native nestlings. Video-recording revealed no aggression between native and no-native nestlings, as well as no aggression from adult birds towards non-native nestlings. The losses before fledging amounted to 4 nestlings. One native and one non-native nestlings were killed on a nest by an Eagle Owl in Altai Republic, and 2 native nestlings died for an unknown cause in Tuva Republic. In total, 9 non-native nestlings and 21 native nestlings successfully fledged and left the nests. The known losses after fledging amounted to 2 young birds – one native and one non-native, both were killed by bigger raptors. The youngest female from the nest in Altai Republic tagged with GPS-GSM tracker successfully migrates and winters now in Mongolia.

  2. Description of the supporting factors of final project in Mathematics and Natural Sciences Faculty of Syiah Kuala University with multiple correspondence analysis

    Rusyana, Asep; Nurhasanah; Maulizasari

    2018-05-01

    Syiah Kuala University (Unsyiah) is hoped to have graduates who are qualified for working or creating a field of work. A final project course implementation process must be effective. This research uses data from the evaluation conducted by Mathematics and Natural Sciences Faculty (FMIPA) of Unsyiah. Some of the factors that support the completion of the final project are duration, guidance, the final project seminars, facility, public impact, and quality. This research aims to know the factors that have a relationship with the completion of the final project and identify similarities among variables. The factors that support the completion of the final project at every study program in FMIPA are (1) duration, (2) guidance and (3) facilities. These factors are examined for the correlations by chi-square test. After that, the variables are analyzed with multiple correspondence analysis. Based on the plot of correspondence, the activities of the guidance and facilities in Informatics Study Program are included in the fair category, while the guidance and facilities in the Chemistry are included in the best category. Besides that, students in Physics can finish the final project with the fastest completion duration, while students in Pharmacy finish for the longest time.

  3. 78 FR 54873 - Notice of Intent To Prepare an Environmental Impact Statement for Multiple Projects in Support of...

    2013-09-06

    ... School, 1001 G St SE., Washington, DC 20390. The public is invited to attend this meeting to view project... newspapers. Please submit requests for special assistance, sign language interpretation for the hearing...

  4. Pinellas County, Florida, Site Environmental Restoration Project Sitewide Environmental Monitoring Semiannual Progress Report for the Young - Rainey STAR Center June Through November 2016, January 2017

    Surovchak, Scott [USDOE Office of Legacy Management, Washington, DC (United States); Daniel, Joe [Navarro Research and Engineering, Inc., Oak Ridge, TN (United States)

    2017-01-01

    The Young - Rainey STAR Center (Science, Technology, and Research Center) at the Pinellas County, Florida, Site is a former U.S. Department of Energy (DOE) facility constructed in the mid-1950s. The 96-acre STAR Center is located in Largo, Florida, and lies in the northeast quarter of Section 13, Township 30 South, Range 15 East (Figure 1). While it was owned by DOE, the purpose of the site was to develop and manufacture components for the nation’s nuclear weapons program. In 1987, the U.S. Environmental Protection Agency (EPA) performed a Resource Conservation and Recovery Act Facility Assessment (EPA 1988) at the site to gather information on potential releases of hazardous materials. In February of 1990, EPA issued a Hazardous and Solid Waste Amendments permit to DOE, requiring DOE to investigate and perform remediation activities in those areas designated as solid-waste management units (SWMUs) contaminated by hazardous materials resulting from DOE operations. A total of 17 SWMUs were identified and investigated at the STAR Center. By 1997, 13 of the 17 SWMUs had been remediated or approved for no further action. More recently, the Florida Department of Environmental Protection (FDEP) executed Conditional Site Rehabilitation Completion Orders for the Northeast Site and the Wastewater Neutralization Area on July 27, 2016, stating that no further action is required for those SWMUs. The Building 100 Area (a combination of the Old Drum Storage Site and the Building 100-Industrial Drain Leaks SWMUs) comprises the only two active SWMUs at the STAR Center (Figure 2). This document serves as the semiannual progress report for the SWMUs by providing the results of recent monitoring activities and a summary of ongoing and projected work. The STAR Center is owned by the Pinellas County Industrial Development Authority, but DOE is responsible for remediation activities at the site. Additional background information for the site is contained in the Long-Term Surveillance

  5. Drivers of Ecological Restoration: Lessons from a Century of Restoration in Iceland

    Ása L. Aradóttir

    2013-12-01

    Full Text Available We analyzed the main drivers for ecological restoration in Iceland from 1907 to 2010 and assessed whether the drivers have changed over time and what factors might explain the changes, if any. Our study was based on a catalogue of 100 restoration projects, programs, and areas, representing 75% to 85% of all restoration activities in Iceland. Catastrophic erosion was an early driver for soil conservation and restoration efforts that still ranked high in the 2000s, reflecting the immense scale of soil erosion and desertification in Iceland. Socioeconomic drivers such as farming and the provision of wood products were strong motivators of ecological restoration over most of the 20th century, although their relative importance decreased with time as the number and diversity of drivers increased. In the 1960s and 1970s, the construction of hard infrastructure, and moral values such as improving the aesthetics of the countryside and "repaying the debt to the land" emerged as motivations for restoration actions. In the late 1990s, the United Nations Climate Change Convention became a driver for restoration, and the importance of nature conservation and recreation increased. Technological development and financial incentives did not show up as drivers of ecological restoration in our study, although there are some indications of their influence. Furthermore, policy was a minor driver, which might reflect weak policy instruments for ecological restoration and some counteractive policies.

  6. Restorative dentistry for children.

    Donly, Kevin J

    2013-01-01

    This article discusses contemporary pediatric restorative dentistry. Indications and contraindications for the choice of different restorative materials in different clinical situations, including the risk assessment of the patient, are presented. The specific use of glass ionomer cement or resin-modified glass ionomer cement, resin-based composite, and stainless steel crowns is discussed so that preparation design and restoration placement is understood. Copyright © 2013 Elsevier Inc. All rights reserved.

  7. Benefits of investing in ecosystem restoration.

    DE Groot, Rudolf S; Blignaut, James; VAN DER Ploeg, Sander; Aronson, James; Elmqvist, Thomas; Farley, Joshua

    2013-12-01

    Measures aimed at conservation or restoration of ecosystems are often seen as net-cost projects by governments and businesses because they are based on incomplete and often faulty cost-benefit analyses. After screening over 200 studies, we examined the costs (94 studies) and benefits (225 studies) of ecosystem restoration projects that had sufficient reliable data in 9 different biomes ranging from coral reefs to tropical forests. Costs included capital investment and maintenance of the restoration project, and benefits were based on the monetary value of the total bundle of ecosystem services provided by the restored ecosystem. Assuming restoration is always imperfect and benefits attain only 75% of the maximum value of the reference systems over 20 years, we calculated the net present value at the social discount rates of 2% and 8%. We also conducted 2 threshold cum sensitivity analyses. Benefit-cost ratios ranged from about 0.05:1 (coral reefs and coastal systems, worst-case scenario) to as much as 35:1 (grasslands, best-case scenario). Our results provide only partial estimates of benefits at one point in time and reflect the lower limit of the welfare benefits of ecosystem restoration because both scarcity of and demand for ecosystem services is increasing and new benefits of natural ecosystems and biological diversity are being discovered. Nonetheless, when accounting for even the incomplete range of known benefits through the use of static estimates that fail to capture rising values, the majority of the restoration projects we analyzed provided net benefits and should be considered not only as profitable but also as high-yielding investments. Beneficios de Invertir en la Restauración de Ecosistemas. © 2013 Society for Conservation Biology.

  8. Cost Estimating Handbook for Environmental Restoration

    1993-01-01

    Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals

  9. Ecological restoration across the Mediterranean Basin as viewed by practitioners.

    Nunes, Alice; Oliveira, Graça; Mexia, Teresa; Valdecantos, Alejandro; Zucca, Claudio; Costantini, Edoardo A C; Abraham, Eleni M; Kyriazopoulos, Apostolos P; Salah, Ayman; Prasse, Ruediger; Correia, Otília; Milliken, Sarah; Kotzen, Benz; Branquinho, Cristina

    2016-10-01

    Restoration efforts in the Mediterranean Basin have been changing from a silvicultural to an ecological restoration approach. Yet, to what extent the projects are guided by ecological restoration principles remains largely unknown. To analyse this issue, we built an on-line survey addressed to restoration practitioners. We analysed 36 restoration projects, mostly from drylands (86%). The projects used mainly soil from local sources. The need to comply with legislation was more important as a restoration motive for European Union (EU) than for non-EU countries, while public opinion and health had a greater importance in the latter. Non-EU countries relied more on non-native plant species than EU countries, thus deviating from ecological restoration guidelines. Nursery-grown plants used were mostly of local or regional provenance, whilst seeds were mostly of national provenance. Unexpected restoration results (e.g. inadequate biodiversity) were reported for 50% of the projects and restoration success was never evaluated in 22%. Long term evaluation (>6years) was only performed in 31% of cases, and based primarily on plant diversity and cover. The use of non-native species and species of exogenous provenances may: i) entail the loss of local genetic and functional trait diversity, critical to cope with drought, particularly under the predicted climate change scenarios, and ii) lead to unexpected competition with native species and/or negatively impact local biotic interactions. Absent or inappropriate monitoring may prevent the understanding of restoration trajectories, precluding adaptive management strategies, often crucial to create functional ecosystems able to provide ecosystem services. The overview of ecological restoration projects in the Mediterranean Basin revealed high variability among practices and highlighted the need for improved scientific assistance and information exchange, greater use of native species of local provenance, and more long

  10. A Policy Analysis Perspective on Ecological Restoration

    Susan Baker

    2013-06-01

    Full Text Available Using a simple stages model of the policy process, we explore the politics of ecological restoration using an array of examples drawn across sector, different size and scale, and from different countries. A policy analysis perspective reveals how, at both the program and project levels, ecological restoration operates within a complex and dynamic interplay between technical decision making, ideologies, and interest politics. Viewed through the stages model, restoration policy involves negotiating nature across stages in the policy making process, including agenda setting, policy formulation, implementation, and evaluation. The stages model is a useful heuristic devise; however, this linear model assumes that policy makers approach the issue rationally. In practice, ecological restoration policy takes place in the context of different distributions of power between the various public and private actors involved at the different stages of restoration policy making. This allows us to reiterate the point that ecological restoration is best seen not only as a technical task but as a social and political project.

  11. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    Ferguson Jones, Andrea; Lee, Angela; Palmeter, Tim

    2013-01-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

  12. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    Ferguson Jones, Andrea; Lee, Angela [MMM Group Limited, 100 Commerce Valley Drive West, Thornhill, Ontario, L3T 0A1 (Canada); Palmeter, Tim [Public Works and Government Services Canada, 4900 Yonge Street, Toronto, Ontario, M2N 6A6 (Canada)

    2013-07-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

  13. Creating a catchment scale perspective for river restoration

    L. Benda

    2011-09-01

    Full Text Available One of the major challenges in river restoration is to identify the natural fluvial landscape in catchments with a long history of river control. Intensive land use on valley floors often predates the earliest remote sensing: levees, dikes, dams, and other structures alter valley-floor morphology, river channels and flow regimes. Consequently, morphological patterns indicative of the fluvial landscape including multiple channels, extensive floodplains, wetlands, and fluvial-riparian and tributary-confluence dynamics can be obscured, and information to develop appropriate and cost effective river restoration strategies can be unavailable. This is the case in the Pas River catchment in northern Spain (650 km2, in which land use and development have obscured the natural fluvial landscape in many parts of the basin. To address this issue we used computer tools to examine the spatial patterns of fluvial landscapes that are associated with five domains of hydro-geomorphic processes and landforms. Using a 5-m digital elevation model, valley-floor surfaces were mapped according to elevation above the channel and proximity to key geomorphic processes. The predicted fluvial landscape is patchily distributed according to hillslope and valley topography, river network structure, and channel elevation profiles. The vast majority of the fluvial landscape in the main segments of the Pas River catchment is presently masked by human infrastructure, with only 15% not impacted by river control structures and development. The reconstructed fluvial landscape provides a catchment scale context to support restoration planning, in which areas of potential ecological productivity and diversity could be targeted for in-channel, floodplain and riparian restoration projects.

  14. Urban river design and aesthetics: A river restoration case study from the UK

    Prior, Jonathan

    2016-01-01

    This paper analyses the restoration of an urbanized section of the River Skerne where it flows through a suburb of Darlington, England; a project which was one of the first comprehensive urban river restorations undertaken in the UK. It is shown how aesthetic values were central to the identification of the River Skerne as a site for restoration, the production of restoration objectives, and a design vision of urban river renewal via restoration. Secondly, the means by which these aesthetic v...

  15. Risks in major innovation projects, a multiple case study within a world's leading company in the fast moving consumer goods

    Keizer, J.A.; Halman, J.I.M.

    2009-01-01

    This paper investigates which risks characterise radical innovation projects. In-dept case studies were carried out via interviews and a questionnaire. The risk concept applied in this study includes three dimensions: certainty, controllability and impact. Three structural or unambiguous risks were

  16. Adaptive restoration of river terrace vegetation through iterative experiments

    Dela Cruz, Michelle P.; Beauchamp, Vanessa B.; Shafroth, Patrick B.; Decker, Cheryl E.; O’Neil, Aviva

    2014-01-01

    Restoration projects can involve a high degree of uncertainty and risk, which can ultimately result in failure. An adaptive restoration approach can reduce uncertainty through controlled, replicated experiments designed to test specific hypotheses and alternative management approaches. Key components of adaptive restoration include willingness of project managers to accept the risk inherent in experimentation, interest of researchers, availability of funding for experimentation and monitoring, and ability to restore sites as iterative experiments where results from early efforts can inform the design of later phases. This paper highlights an ongoing adaptive restoration project at Zion National Park (ZNP), aimed at reducing the cover of exotic annual Bromus on riparian terraces, and revegetating these areas with native plant species. Rather than using a trial-and-error approach, ZNP staff partnered with academic, government, and private-sector collaborators to conduct small-scale experiments to explicitly address uncertainties concerning biomass removal of annual bromes, herbicide application rates and timing, and effective seeding methods for native species. Adaptive restoration has succeeded at ZNP because managers accept the risk inherent in experimentation and ZNP personnel are committed to continue these projects over a several-year period. Techniques that result in exotic annual Bromus removal and restoration of native plant species at ZNP can be used as a starting point for adaptive restoration projects elsewhere in the region.

  17. Ecological restoration [book review

    Eric J. Gustafson

    2010-01-01

    Ecological restoration has increased in prominence in recent years as environmental policies have slowed the rate of environmental degradation in many parts of the world and practitioners have looked for active ways to reverse the damage. Because of the vast number of types and contexts of degraded ecological systems, the field of ecological restoration is still very...

  18. Community-based management of multiple drug resistant tuberculosis in a tertiary hospital in Tanzania: a best practice implementation project.

    Jelly, Isaya; Peters, Micah D J

    2017-12-01

    The World Health Organization (WHO) has prioritized collaboration with communities in its 2016 "End TB" implementation strategy. Acknowledging the difficulties that some communities face in gaining access to health facilities due to barriers such as stigma, discrimination, healthcare expenditure, transport and income loss, partnering with communities in the roll-out of community-based TB management activities is vital. The aim of this project was to make a contribution to promoting evidence-based practice with regards to the community-based management of multidrug-resistant tuberculosis (MDR-TB) at Kibong'oto National Infectious Disease Hospital, Tanzania, and thereby supporting improvements in patient outcomes and resource utilization. The project utilized the Joanna Briggs Institute Practical Application of Clinical Evidence System (JBI PACES) program to facilitate the collection of pre- and post-audit data. The Getting Research into Practice (GRiP) module was also used to analyze the potential barriers and for designing the final action plan. This project was conducted in three phases over a three-month period at the MDR-TB unit in a referral hospital in Northern Tanzania. The project showed that there were significant improvements in compliance rates in staff education and documentation of patients' suitability and preferences in receiving community-based care for MDR-TB. The compliance rate of criterion 2, which was already 100% at baseline, was slightly lower at follow-up. The project achieved significant improvements in the delivery of evidence-based practice with regards to community-based management of MDR-TB.

  19. Retributive and restorative justice.

    Wenzel, Michael; Okimoto, Tyler G; Feather, Norman T; Platow, Michael J

    2008-10-01

    The emergence of restorative justice as an alternative model to Western, court-based criminal justice may have important implications for the psychology of justice. It is proposed that two different notions of justice affect responses to rule-breaking: restorative and retributive justice. Retributive justice essentially refers to the repair of justice through unilateral imposition of punishment, whereas restorative justice means the repair of justice through reaffirming a shared value-consensus in a bilateral process. Among the symbolic implications of transgressions, concerns about status and power are primarily related to retributive justice and concerns about shared values are primarily related to restorative justice. At the core of these processes, however, lies the parties' construal of their identity relation, specifically whether or not respondents perceive to share an identity with the offender. The specific case of intergroup transgressions is discussed, as are implications for future research on restoring a sense of justice after rule-breaking.

  20. A GIS Approach to Prioritizing Habitat for Restoration Using Neotropical Migrant Songbird Criteria

    Holzmueller, Eric J.; Gaskins, Michael D.; Mangun, Jean C.

    2011-07-01

    Restoration efforts to increase wildlife habitat quality in agricultural landscapes have limited funding and are typically done on a first come, first serve basis. In order to increase the efficiency of these restoration efforts, a prioritized ranking system is needed to obtain the greatest increase in habitat quality possible for the fewest amount of hectares restored. This project examines the use of a GIS based multi-criteria approach to prioritize lands for reforestation along the Kaskaskia River in Illinois. Loss of forested area and corresponding increase in forest fragmentation has decreased songbird habitat quality across the Midwestern United States. We prioritized areas for reforestation based on nine landscape metrics: available agricultural land, forest cover gaps, edge density, proximity to river, 200 m corridor area, total forest core area, fringe core area, distance to primary core value, and primary core area. The multi-criteria analysis revealed that high priority areas for reforestation were most likely to be close to the riparian corridor and existing large blocks of forest. Analysis of simulated reforestation (0, 0.5, 1.0, 5.0 10.0, 25.0, and 50.0% of highest priority parcels reforested) revealed different responses for multiple landscape metrics used to quantify forest fragmentation following reforestation, but indicated that the study area would get the greatest rate of return on reforestation efforts by reforesting 10.0% of the highest priority areas. This project demonstrates how GIS and a multi-criteria analysis approach can be used to increase the efficiency of restoration projects. This approach should be considered by land managers when attempting to identify the location and quantity of area for restoration within a landscape.