WorldWideScience

Sample records for model management system

  1. Pembangunan Model Restaurant Management System

    OpenAIRE

    Fredy Jingga; Natalia Limantara

    2014-01-01

    Model design for Restaurant Management System aims to help in restaurant business process, where Restaurant Management System (RMS) help the waitress and chef could interact each other without paper limitation.  This Restaurant Management System Model develop using Agile Methodology and developed based on PHP Programming Langguage. The database management system is using MySQL. This web-based application model will enable the waitress and the chef to interact in realtime, from the time they a...

  2. Pembangunan Model Restaurant Management System

    Directory of Open Access Journals (Sweden)

    Fredy Jingga

    2014-12-01

    Full Text Available Model design for Restaurant Management System aims to help in restaurant business process, where Restaurant Management System (RMS help the waitress and chef could interact each other without paper limitation.  This Restaurant Management System Model develop using Agile Methodology and developed based on PHP Programming Langguage. The database management system is using MySQL. This web-based application model will enable the waitress and the chef to interact in realtime, from the time they accept the customer order until the chef could know what to cook and checklist for the waitress wheter the order is fullfill or not, until the cahsier that will calculate the bill and the payment that they accep from the customer.

  3. Multiple system modelling of waste management

    International Nuclear Information System (INIS)

    Eriksson, Ola; Bisaillon, Mattias

    2011-01-01

    Highlights: → Linking of models will provide a more complete, correct and credible picture of the systems. → The linking procedure is easy to perform and also leads to activation of project partners. → The simulation procedure is a bit more complicated and calls for the ability to run both models. - Abstract: Due to increased environmental awareness, planning and performance of waste management has become more and more complex. Therefore waste management has early been subject to different types of modelling. Another field with long experience of modelling and systems perspective is energy systems. The two modelling traditions have developed side by side, but so far there are very few attempts to combine them. Waste management systems can be linked together with energy systems through incineration plants. The models for waste management can be modelled on a quite detailed level whereas surrounding systems are modelled in a more simplistic way. This is a problem, as previous studies have shown that assumptions on the surrounding system often tend to be important for the conclusions. In this paper it is shown how two models, one for the district heating system (MARTES) and another one for the waste management system (ORWARE), can be linked together. The strengths and weaknesses with model linking are discussed when compared to simplistic assumptions on effects in the energy and waste management systems. It is concluded that the linking of models will provide a more complete, correct and credible picture of the consequences of different simultaneous changes in the systems. The linking procedure is easy to perform and also leads to activation of project partners. However, the simulation procedure is a bit more complicated and calls for the ability to run both models.

  4. Model-based version management system framework

    International Nuclear Information System (INIS)

    Mehmood, W.

    2016-01-01

    In this paper we present a model-based version management system. Version Management System (VMS) a branch of software configuration management (SCM) aims to provide a controlling mechanism for evolution of software artifacts created during software development process. Controlling the evolution requires many activities to perform, such as, construction and creation of versions, identification of differences between versions, conflict detection and merging. Traditional VMS systems are file-based and consider software systems as a set of text files. File based VMS systems are not adequate for performing software configuration management activities such as, version control on software artifacts produced in earlier phases of the software life cycle. New challenges of model differencing, merge, and evolution control arise while using models as central artifact. The goal of this work is to present a generic framework model-based VMS which can be used to overcome the problem of tradition file-based VMS systems and provide model versioning services. (author)

  5. A model for international border management systems.

    Energy Technology Data Exchange (ETDEWEB)

    Duggan, Ruth Ann

    2008-09-01

    To effectively manage the security or control of its borders, a country must understand its border management activities as a system. Using its systems engineering and security foundations as a Department of Energy National Security Laboratory, Sandia National Laboratories has developed such an approach to modeling and analyzing border management systems. This paper describes the basic model and its elements developed under Laboratory Directed Research and Development project 08-684.

  6. Modelling the Replication Management in Information Systems

    Directory of Open Access Journals (Sweden)

    Cezar TOADER

    2017-01-01

    Full Text Available In the modern economy, the benefits of Web services are significant because they facilitates the activities automation in the framework of Internet distributed businesses as well as the cooperation between organizations through interconnection process running in the computer systems. This paper presents the development stages of a model for a reliable information system. This paper describes the communication between the processes within the distributed system, based on the message exchange, and also presents the problem of distributed agreement among processes. A list of objectives for the fault-tolerant systems is defined and a framework model for distributed systems is proposed. This framework makes distinction between management operations and execution operations. The proposed model promotes the use of a central process especially designed for the coordination and control of other application processes. The execution phases and the protocols for the management and the execution components are presented. This model of a reliable system could be a foundation for an entire class of distributed systems models based on the management of replication process.

  7. Evaluation of Workflow Management Systems - A Meta Model Approach

    Directory of Open Access Journals (Sweden)

    Michael Rosemann

    1998-11-01

    Full Text Available The automated enactment of processes through the use of workflow management systems enables the outsourcing of the control flow from application systems. By now a large number of systems, that follow different workflow paradigms, are available. This leads to the problem of selecting the appropriate workflow management system for a given situation. In this paper we outline the benefits of a meta model approach for the evaluation and comparison of different workflow management systems. After a general introduction on the topic of meta modeling the meta models of the workflow management systems WorkParty (Siemens Nixdorf and FlowMark (IBM are compared as an example. These product specific meta models can be generalized to meta reference models, which helps to specify a workflow methodology. Exemplary, an organisational reference meta model is presented, which helps users in specifying their requirements for a workflow management system.

  8. Domain Specific Language for Modeling Waste Management Systems

    DEFF Research Database (Denmark)

    Zarrin, Bahram

    environmental technologies i.e. solid waste management systems. Flow-based programming is used to support concurrent execution of the processes, and provides a model-integration language for composing processes from homogeneous or heterogeneous domains. And a domain-specific language is used to define atomic......In order to develop sustainable waste management systems with considering life cycle perspective, scientists and domain experts in environmental science require readily applicable tools for modeling and evaluating the life cycle impacts of the waste management systems. Practice has proved...... a domain specific language for modeling of waste-management systems on the basis of our framework. We evaluate the language by providing a set of case studies. The contributions of this thesis are; addressing separation of concerns in Flow-based programming and providing the formal specification of its...

  9. A model management system for combat simulation

    OpenAIRE

    Dolk, Daniel R.

    1986-01-01

    The design and implementation of a model management system to support combat modeling is discussed. Structured modeling is introduced as a formalism for representing mathematical models. A relational information resource dictionary system is developed which can accommodate structured models. An implementation is described. Structured modeling is then compared to Jackson System Development (JSD) as a methodology for facilitating discrete event simulation. JSD is currently better at representin...

  10. A Systems Model for Teaching Human Resource Management

    Directory of Open Access Journals (Sweden)

    George R. Greene

    2013-07-01

    Full Text Available Efficient and effective human resource management is a complex, involved, and interactive process. This article presents and discusses a unique systems approach model for teaching human resource (people management processes, and the important inter-relationships within that process. The model contains two unique components related to key sub-processes: incentives management and performance evaluation. We have not observed a model applying a systems thinking paradigm presented in any textbook, journal article, business publication, or other literature addressing the topic. For nearly three decades, the model has been used in teaching a comprehensive, meaningful understanding of the human resource management process that can be effectively implemented in both corporate and academic learning venues.

  11. Ontological Model of Business Process Management Systems

    Science.gov (United States)

    Manoilov, G.; Deliiska, B.

    2008-10-01

    The activities which constitute business process management (BPM) can be grouped into five categories: design, modeling, execution, monitoring and optimization. Dedicated software packets for business process management system (BPMS) are available on the market. But the efficiency of its exploitation depends on used ontological model in the development time and run time of the system. In the article an ontological model of BPMS in area of software industry is investigated. The model building is preceded by conceptualization of the domain and taxonomy of BPMS development. On the base of the taxonomy an simple online thesaurus is created.

  12. Data management system performance modeling

    Science.gov (United States)

    Kiser, Larry M.

    1993-01-01

    This paper discusses analytical techniques that have been used to gain a better understanding of the Space Station Freedom's (SSF's) Data Management System (DMS). The DMS is a complex, distributed, real-time computer system that has been redesigned numerous times. The implications of these redesigns have not been fully analyzed. This paper discusses the advantages and disadvantages for static analytical techniques such as Rate Monotonic Analysis (RMA) and also provides a rationale for dynamic modeling. Factors such as system architecture, processor utilization, bus architecture, queuing, etc. are well suited for analysis with a dynamic model. The significance of performance measures for a real-time system are discussed.

  13. A Management Information System Model for Program Management. Ph.D. Thesis - Oklahoma State Univ.; [Computerized Systems Analysis

    Science.gov (United States)

    Shipman, D. L.

    1972-01-01

    The development of a model to simulate the information system of a program management type of organization is reported. The model statistically determines the following parameters: type of messages, destinations, delivery durations, type processing, processing durations, communication channels, outgoing messages, and priorites. The total management information system of the program management organization is considered, including formal and informal information flows and both facilities and equipment. The model is written in General Purpose System Simulation 2 computer programming language for use on the Univac 1108, Executive 8 computer. The model is simulated on a daily basis and collects queue and resource utilization statistics for each decision point. The statistics are then used by management to evaluate proposed resource allocations, to evaluate proposed changes to the system, and to identify potential problem areas. The model employs both empirical and theoretical distributions which are adjusted to simulate the information flow being studied.

  14. Real-Time System for Water Modeling and Management

    Science.gov (United States)

    Lee, J.; Zhao, T.; David, C. H.; Minsker, B.

    2012-12-01

    Working closely with the Texas Commission on Environmental Quality (TCEQ) and the University of Texas at Austin (UT-Austin), we are developing a real-time system for water modeling and management using advanced cyberinfrastructure, data integration and geospatial visualization, and numerical modeling. The state of Texas suffered a severe drought in 2011 that cost the state $7.62 billion in agricultural losses (crops and livestock). Devastating situations such as this could potentially be avoided with better water modeling and management strategies that incorporate state of the art simulation and digital data integration. The goal of the project is to prototype a near-real-time decision support system for river modeling and management in Texas that can serve as a national and international model to promote more sustainable and resilient water systems. The system uses National Weather Service current and predicted precipitation data as input to the Noah-MP Land Surface model, which forecasts runoff, soil moisture, evapotranspiration, and water table levels given land surface features. These results are then used by a river model called RAPID, along with an error model currently under development at UT-Austin, to forecast stream flows in the rivers. Model forecasts are visualized as a Web application for TCEQ decision makers, who issue water diversion (withdrawal) permits and any needed drought restrictions; permit holders; and reservoir operation managers. Users will be able to adjust model parameters to predict the impacts of alternative curtailment scenarios or weather forecasts. A real-time optimization system under development will help TCEQ to identify optimal curtailment strategies to minimize impacts on permit holders and protect health and safety. To develop the system we have implemented RAPID as a remotely-executed modeling service using the Cyberintegrator workflow system with input data downloaded from the North American Land Data Assimilation System. The

  15. Knowledge Management System Model for Learning Organisations

    Science.gov (United States)

    Amin, Yousif; Monamad, Roshayu

    2017-01-01

    Based on the literature of knowledge management (KM), this paper reports on the progress of developing a new knowledge management system (KMS) model with components architecture that are distributed over the widely-recognised socio-technical system (STS) aspects to guide developers for selecting the most applicable components to support their KM…

  16. Vehicle System Management Modeling in UML for Ares I

    Science.gov (United States)

    Pearson, Newton W.; Biehn, Bradley A.; Curry, Tristan D.; Martinez, Mario R.

    2011-01-01

    The Spacecraft & Vehicle Systems Department of Marshall Space Flight Center is responsible for modeling the Vehicle System Management for the Ares I vehicle which was a part of the now canceled Constellation Program. An approach to generating the requirements for the Vehicle System Management was to use the Unified Modeling Language technique to build and test a model that would fulfill the Vehicle System Management requirements. UML has been used on past projects (flight software) in the design phase of the effort but this was the first attempt to use the UML technique from a top down requirements perspective.

  17. Data Model Management for Space Information Systems

    Science.gov (United States)

    Hughes, J. Steven; Crichton, Daniel J.; Ramirez, Paul; Mattmann, chris

    2006-01-01

    The Reference Architecture for Space Information Management (RASIM) suggests the separation of the data model from software components to promote the development of flexible information management systems. RASIM allows the data model to evolve independently from the software components and results in a robust implementation that remains viable as the domain changes. However, the development and management of data models within RASIM are difficult and time consuming tasks involving the choice of a notation, the capture of the model, its validation for consistency, and the export of the model for implementation. Current limitations to this approach include the lack of ability to capture comprehensive domain knowledge, the loss of significant modeling information during implementation, the lack of model visualization and documentation capabilities, and exports being limited to one or two schema types. The advent of the Semantic Web and its demand for sophisticated data models has addressed this situation by providing a new level of data model management in the form of ontology tools. In this paper we describe the use of a representative ontology tool to capture and manage a data model for a space information system. The resulting ontology is implementation independent. Novel on-line visualization and documentation capabilities are available automatically, and the ability to export to various schemas can be added through tool plug-ins. In addition, the ingestion of data instances into the ontology allows validation of the ontology and results in a domain knowledge base. Semantic browsers are easily configured for the knowledge base. For example the export of the knowledge base to RDF/XML and RDFS/XML and the use of open source metadata browsers provide ready-made user interfaces that support both text- and facet-based search. This paper will present the Planetary Data System (PDS) data model as a use case and describe the import of the data model into an ontology tool

  18. System management model based on the design SWOT-matrix and quality management system for energy complex enterprise

    OpenAIRE

    Novikov, Vladimir

    2010-01-01

    The article deals with categorical apparatus of information management systems to build a model pairing SWOT-matrix and the quality management system, which is especially important for the energytion industry.

  19. An architecture model for multiple disease management information systems.

    Science.gov (United States)

    Chen, Lichin; Yu, Hui-Chu; Li, Hao-Chun; Wang, Yi-Van; Chen, Huang-Jen; Wang, I-Ching; Wang, Chiou-Shiang; Peng, Hui-Yu; Hsu, Yu-Ling; Chen, Chi-Huang; Chuang, Lee-Ming; Lee, Hung-Chang; Chung, Yufang; Lai, Feipei

    2013-04-01

    Disease management is a program which attempts to overcome the fragmentation of healthcare system and improve the quality of care. Many studies have proven the effectiveness of disease management. However, the case managers were spending the majority of time in documentation, coordinating the members of the care team. They need a tool to support them with daily practice and optimizing the inefficient workflow. Several discussions have indicated that information technology plays an important role in the era of disease management. Whereas applications have been developed, it is inefficient to develop information system for each disease management program individually. The aim of this research is to support the work of disease management, reform the inefficient workflow, and propose an architecture model that enhance on the reusability and time saving of information system development. The proposed architecture model had been successfully implemented into two disease management information system, and the result was evaluated through reusability analysis, time consumed analysis, pre- and post-implement workflow analysis, and user questionnaire survey. The reusability of the proposed model was high, less than half of the time was consumed, and the workflow had been improved. The overall user aspect is positive. The supportiveness during daily workflow is high. The system empowers the case managers with better information and leads to better decision making.

  20. BALANCED SCORECARDS EVALUATION MODEL THAT INCLUDES ELEMENTS OF ENVIRONMENTAL MANAGEMENT SYSTEM USING AHP MODEL

    Directory of Open Access Journals (Sweden)

    Jelena Jovanović

    2010-03-01

    Full Text Available The research is oriented on improvement of environmental management system (EMS using BSC (Balanced Scorecard model that presents strategic model of measurem ents and improvement of organisational performance. The research will present approach of objectives and environmental management me trics involvement (proposed by literature review in conventional BSC in "Ad Barska plovi dba" organisation. Further we will test creation of ECO-BSC model based on business activities of non-profit organisations in order to improve envir onmental management system in parallel with other systems of management. Using this approach we may obtain 4 models of BSC that includ es elements of environmen tal management system for AD "Barska plovidba". Taking into acc ount that implementation and evaluation need long period of time in AD "Barska plovidba", the final choice will be based on 14598 (Information technology - Software product evaluation and ISO 9126 (Software engineering - Product quality using AHP method. Those standards are usually used for evaluation of quality software product and computer programs that serve in organisation as support and factors for development. So, AHP model will be bas ed on evolution criteria based on suggestion of ISO 9126 standards and types of evaluation from two evaluation teams. Members of team & will be experts in BSC and environmental management system that are not em ployed in AD "Barska Plovidba" organisation. The members of team 2 will be managers of AD "Barska Plovidba" organisation (including manage rs from environmental department. Merging results based on previously cr eated two AHP models, one can obtain the most appropriate BSC that includes elements of environmental management system. The chosen model will present at the same time suggestion for approach choice including ecological metrics in conventional BSC model for firm that has at least one ECO strategic orientation.

  1. Calibration of controlling input models for pavement management system.

    Science.gov (United States)

    2013-07-01

    The Oklahoma Department of Transportation (ODOT) is currently using the Deighton Total Infrastructure Management System (dTIMS) software for pavement management. This system is based on several input models which are computational backbones to dev...

  2. A Model-Driven Development Method for Management Information Systems

    Science.gov (United States)

    Mizuno, Tomoki; Matsumoto, Keinosuke; Mori, Naoki

    Traditionally, a Management Information System (MIS) has been developed without using formal methods. By the informal methods, the MIS is developed on its lifecycle without having any models. It causes many problems such as lack of the reliability of system design specifications. In order to overcome these problems, a model theory approach was proposed. The approach is based on an idea that a system can be modeled by automata and set theory. However, it is very difficult to generate automata of the system to be developed right from the start. On the other hand, there is a model-driven development method that can flexibly correspond to changes of business logics or implementing technologies. In the model-driven development, a system is modeled using a modeling language such as UML. This paper proposes a new development method for management information systems applying the model-driven development method to a component of the model theory approach. The experiment has shown that a reduced amount of efforts is more than 30% of all the efforts.

  3. MDOT Pavement Management System : Prediction Models and Feedback System

    Science.gov (United States)

    2000-10-01

    As a primary component of a Pavement Management System (PMS), prediction models are crucial for one or more of the following analyses: : maintenance planning, budgeting, life-cycle analysis, multi-year optimization of maintenance works program, and a...

  4. Intelligent Model Management in a Forest Ecosystem Management Decision Support System

    Science.gov (United States)

    Donald Nute; Walter D. Potter; Frederick Maier; Jin Wang; Mark Twery; H. Michael Rauscher; Peter Knopp; Scott Thomasma; Mayukh Dass; Hajime Uchiyama

    2002-01-01

    Decision making for forest ecosystem management can include the use of a wide variety of modeling tools. These tools include vegetation growth models, wildlife models, silvicultural models, GIS, and visualization tools. NED-2 is a robust, intelligent, goal-driven decision support system that integrates tools in each of these categories. NED-2 uses a blackboard...

  5. MODEL OF IMPROVING ENVIRONMENTAL MANAGEMENT SYSTEM BY MULTI - SOFTWARE

    Directory of Open Access Journals (Sweden)

    Jelena Jovanovic

    2009-03-01

    Full Text Available This paper is based on doctoral dissertation which is oriented on improving environmental management system using multi - software. In this doctoral dissertation will be used key results of master thesis which is oriented on quantification environmental aspects and impacts by artificial neural network in organizations. This paper recommend improving environmental management system in organization using Balanced scorecard model and MCDM method - AHP (Analytic hierarchy process based on group decision. BSC would be spread with elements of Environmental management system and used in area of strategic management system in organization and AHP would be used in area of checking results getting by quantification environmental aspects and impacts.

  6. Mental models of a water management system in a green building.

    Science.gov (United States)

    Kalantzis, Anastasia; Thatcher, Andrew; Sheridan, Craig

    2016-11-01

    This intergroup case study compared users' mental models with an expert design model of a water management system in a green building. The system incorporates a constructed wetland component and a rainwater collection pond that together recycle water for re-use in the building and its surroundings. The sample consisted of five building occupants and the cleaner (6 users) and two experts who were involved with the design of the water management system. Users' mental model descriptions and the experts' design model were derived from in-depth interviews combined with self-constructed (and verified) diagrams. Findings from the study suggest that there is considerable variability in the user mental models that could impact the efficient functioning of the water management system. Recommendations for improvements are discussed. Copyright © 2016 Elsevier Ltd. All rights reserved.

  7. Modelling sensitivity and uncertainty in a LCA model for waste management systems - EASETECH

    DEFF Research Database (Denmark)

    Damgaard, Anders; Clavreul, Julie; Baumeister, Hubert

    2013-01-01

    In the new model, EASETECH, developed for LCA modelling of waste management systems, a general approach for sensitivity and uncertainty assessment for waste management studies has been implemented. First general contribution analysis is done through a regular interpretation of inventory and impact...

  8. Dynamic Modelling of a Knowledge Management System Evolution for a Technological Corporation

    International Nuclear Information System (INIS)

    Pershukov, V.; Belenkaya, N.; Sheveleva, S.; Kuptsov, I.; Andrianov, A.; Fesenko, G.

    2016-01-01

    Full text: The paper describes a dynamic mathematical model of a knowledge management system for a technological corporation. The model consists of three equations for generalized variables which characterize the human capacity, accumulated knowledge and profits interrelated by means of the Cobb–Douglas production function. The presented model is intended to simulate the system evolution over time including identification of possible catastrophic behavior of the system and can be used to solve various problems of forecasting the development of knowledge management systems in technological corporations, and assess the effectiveness of organizational measures aimed at improving the system efficiency. Using this model, it is possible to simulate the system evolution over time and conduct scenario research in the changing internal and external conditions as well as select the optimal system parameters in order to achieve certain goals and formulate requirements for the system components. The authors present the results of applying this model in simulating the dynamics of the knowledge management system development in a technological corporation and discuss some methodological issues related to the mathematical modeling of processes and models of knowledge management. (author

  9. MODEL OF THE QUALITY MANAGEMENT SYSTEM OF A MACHINE TOOL COMPANY

    Directory of Open Access Journals (Sweden)

    Катерина Вікторівна КОЛЕСНІКОВА

    2016-02-01

    Full Text Available Development of models and methods such that would improve the competitive position of enterprises by improving management processes is an important task of project management. Lack of project management within the information technology and continuous improvement of methods for the management of the environment, interaction, community, value and trust, based on the strategic objectives of enterprises and based on models that take into account the relationship of the system, resulting in significant material and resource costs. In the current work the improvement of the quality management system machine-tool company HC MIKRON® and proved that the introduction of new processes critical analysis requirements for products, support processes of the products to consumers and enterprises in the formation of a system of responsibility, division of responsibilities and reporting (according to ISO 9001: 2009 is an important scientific and reasonable step to improve the level of technological maturity and structural modernization of enterprise management. For the improved structure of the analysis model and test the properties of ergodicity, as a condition of efficiency, a new quality management system.

  10. Integrated dynamic modeling and management system mission analysis

    Energy Technology Data Exchange (ETDEWEB)

    Lee, A.K.

    1994-12-28

    This document summarizes the mission analysis performed on the Integrated Dynamic Modeling and Management System (IDMMS). The IDMMS will be developed to provide the modeling and analysis capability required to understand the TWRS system behavior in terms of the identified TWRS performance measures. The IDMMS will be used to demonstrate in a verified and validated manner the satisfactory performance of the TWRS system configuration and assurance that the requirements have been satisfied.

  11. Integrated dynamic modeling and management system mission analysis

    International Nuclear Information System (INIS)

    Lee, A.K.

    1994-01-01

    This document summarizes the mission analysis performed on the Integrated Dynamic Modeling and Management System (IDMMS). The IDMMS will be developed to provide the modeling and analysis capability required to understand the TWRS system behavior in terms of the identified TWRS performance measures. The IDMMS will be used to demonstrate in a verified and validated manner the satisfactory performance of the TWRS system configuration and assurance that the requirements have been satisfied

  12. Automated Generation of Fault Management Artifacts from a Simple System Model

    Science.gov (United States)

    Kennedy, Andrew K.; Day, John C.

    2013-01-01

    Our understanding of off-nominal behavior - failure modes and fault propagation - in complex systems is often based purely on engineering intuition; specific cases are assessed in an ad hoc fashion as a (fallible) fault management engineer sees fit. This work is an attempt to provide a more rigorous approach to this understanding and assessment by automating the creation of a fault management artifact, the Failure Modes and Effects Analysis (FMEA) through querying a representation of the system in a SysML model. This work builds off the previous development of an off-nominal behavior model for the upcoming Soil Moisture Active-Passive (SMAP) mission at the Jet Propulsion Laboratory. We further developed the previous system model to more fully incorporate the ideas of State Analysis, and it was restructured in an organizational hierarchy that models the system as layers of control systems while also incorporating the concept of "design authority". We present software that was developed to traverse the elements and relationships in this model to automatically construct an FMEA spreadsheet. We further discuss extending this model to automatically generate other typical fault management artifacts, such as Fault Trees, to efficiently portray system behavior, and depend less on the intuition of fault management engineers to ensure complete examination of off-nominal behavior.

  13. Conceptual model of management steadfast economic development production-economic systems

    OpenAIRE

    Prokhorova, V.

    2010-01-01

    The article is devoted developments of conceptual model of management proof economic development of the industrialeconomy systems. Features are certain, the algorithm of impulse is offered and intercommunication of contours of management proof economic development of the industrialeconomy systems is investigational

  14. Insertion algorithms for network model database management systems

    Science.gov (United States)

    Mamadolimov, Abdurashid; Khikmat, Saburov

    2017-12-01

    The network model is a database model conceived as a flexible way of representing objects and their relationships. Its distinguishing feature is that the schema, viewed as a graph in which object types are nodes and relationship types are arcs, forms partial order. When a database is large and a query comparison is expensive then the efficiency requirement of managing algorithms is minimizing the number of query comparisons. We consider updating operation for network model database management systems. We develop a new sequantial algorithm for updating operation. Also we suggest a distributed version of the algorithm.

  15. The Modular Modeling System (MMS): A modeling framework for water- and environmental-resources management

    Science.gov (United States)

    Leavesley, G.H.; Markstrom, S.L.; Viger, R.J.

    2004-01-01

    The interdisciplinary nature and increasing complexity of water- and environmental-resource problems require the use of modeling approaches that can incorporate knowledge from a broad range of scientific disciplines. The large number of distributed hydrological and ecosystem models currently available are composed of a variety of different conceptualizations of the associated processes they simulate. Assessment of the capabilities of these distributed models requires evaluation of the conceptualizations of the individual processes, and the identification of which conceptualizations are most appropriate for various combinations of criteria, such as problem objectives, data constraints, and spatial and temporal scales of application. With this knowledge, "optimal" models for specific sets of criteria can be created and applied. The U.S. Geological Survey (USGS) Modular Modeling System (MMS) is an integrated system of computer software that has been developed to provide these model development and application capabilities. MMS supports the integration of models and tools at a variety of levels of modular design. These include individual process models, tightly coupled models, loosely coupled models, and fully-integrated decision support systems. A variety of visualization and statistical tools are also provided. MMS has been coupled with the Bureau of Reclamation (BOR) object-oriented reservoir and river-system modeling framework, RiverWare, under a joint USGS-BOR program called the Watershed and River System Management Program. MMS and RiverWare are linked using a shared relational database. The resulting database-centered decision support system provides tools for evaluating and applying optimal resource-allocation and management strategies to complex, operational decisions on multipurpose reservoir systems and watersheds. Management issues being addressed include efficiency of water-resources management, environmental concerns such as meeting flow needs for

  16. An inexact reverse logistics model for municipal solid waste management systems.

    Science.gov (United States)

    Zhang, Yi Mei; Huang, Guo He; He, Li

    2011-03-01

    This paper proposed an inexact reverse logistics model for municipal solid waste management systems (IRWM). Waste managers, suppliers, industries and distributors were involved in strategic planning and operational execution through reverse logistics management. All the parameters were assumed to be intervals to quantify the uncertainties in the optimization process and solutions in IRWM. To solve this model, a piecewise interval programming was developed to deal with Min-Min functions in both objectives and constraints. The application of the model was illustrated through a classical municipal solid waste management case. With different cost parameters for landfill and the WTE, two scenarios were analyzed. The IRWM could reflect the dynamic and uncertain characteristics of MSW management systems, and could facilitate the generation of desired management plans. The model could be further advanced through incorporating methods of stochastic or fuzzy parameters into its framework. Design of multi-waste, multi-echelon, multi-uncertainty reverse logistics model for waste management network would also be preferred. Copyright © 2010 Elsevier Ltd. All rights reserved.

  17. Models meet data: Challenges and opportunities in implementing land management in Earth system models.

    Science.gov (United States)

    Pongratz, Julia; Dolman, Han; Don, Axel; Erb, Karl-Heinz; Fuchs, Richard; Herold, Martin; Jones, Chris; Kuemmerle, Tobias; Luyssaert, Sebastiaan; Meyfroidt, Patrick; Naudts, Kim

    2018-04-01

    As the applications of Earth system models (ESMs) move from general climate projections toward questions of mitigation and adaptation, the inclusion of land management practices in these models becomes crucial. We carried out a survey among modeling groups to show an evolution from models able only to deal with land-cover change to more sophisticated approaches that allow also for the partial integration of land management changes. For the longer term a comprehensive land management representation can be anticipated for all major models. To guide the prioritization of implementation, we evaluate ten land management practices-forestry harvest, tree species selection, grazing and mowing harvest, crop harvest, crop species selection, irrigation, wetland drainage, fertilization, tillage, and fire-for (1) their importance on the Earth system, (2) the possibility of implementing them in state-of-the-art ESMs, and (3) availability of required input data. Matching these criteria, we identify "low-hanging fruits" for the inclusion in ESMs, such as basic implementations of crop and forestry harvest and fertilization. We also identify research requirements for specific communities to address the remaining land management practices. Data availability severely hampers modeling the most extensive land management practice, grazing and mowing harvest, and is a limiting factor for a comprehensive implementation of most other practices. Inadequate process understanding hampers even a basic assessment of crop species selection and tillage effects. The need for multiple advanced model structures will be the challenge for a comprehensive implementation of most practices but considerable synergy can be gained using the same structures for different practices. A continuous and closer collaboration of the modeling, Earth observation, and land system science communities is thus required to achieve the inclusion of land management in ESMs. © 2017 John Wiley & Sons Ltd.

  18. SEEK: a systems biology data and model management platform.

    Science.gov (United States)

    Wolstencroft, Katherine; Owen, Stuart; Krebs, Olga; Nguyen, Quyen; Stanford, Natalie J; Golebiewski, Martin; Weidemann, Andreas; Bittkowski, Meik; An, Lihua; Shockley, David; Snoep, Jacky L; Mueller, Wolfgang; Goble, Carole

    2015-07-11

    Systems biology research typically involves the integration and analysis of heterogeneous data types in order to model and predict biological processes. Researchers therefore require tools and resources to facilitate the sharing and integration of data, and for linking of data to systems biology models. There are a large number of public repositories for storing biological data of a particular type, for example transcriptomics or proteomics, and there are several model repositories. However, this silo-type storage of data and models is not conducive to systems biology investigations. Interdependencies between multiple omics datasets and between datasets and models are essential. Researchers require an environment that will allow the management and sharing of heterogeneous data and models in the context of the experiments which created them. The SEEK is a suite of tools to support the management, sharing and exploration of data and models in systems biology. The SEEK platform provides an access-controlled, web-based environment for scientists to share and exchange data and models for day-to-day collaboration and for public dissemination. A plug-in architecture allows the linking of experiments, their protocols, data, models and results in a configurable system that is available 'off the shelf'. Tools to run model simulations, plot experimental data and assist with data annotation and standardisation combine to produce a collection of resources that support analysis as well as sharing. Underlying semantic web resources additionally extract and serve SEEK metadata in RDF (Resource Description Format). SEEK RDF enables rich semantic queries, both within SEEK and between related resources in the web of Linked Open Data. The SEEK platform has been adopted by many systems biology consortia across Europe. It is a data management environment that has a low barrier of uptake and provides rich resources for collaboration. This paper provides an update on the functions and

  19. Bridge deterioration models to support Indiana's bridge management system.

    Science.gov (United States)

    2016-02-01

    An effective bridge management system that is equipped with reliable deterioration models enables agency engineers to carry out : monitoring and long-term programming of bridge repair actions. At the project level, deterioration models help the agenc...

  20. ENVIRONMENTAL RESPONSIBILITY MODEL BASED ON ISO 14000 MANAGEMENT SYSTEMS

    Directory of Open Access Journals (Sweden)

    Catalina SITNIKOV

    2012-01-01

    Full Text Available Worldwide corporations, as well as their stakeholders, are more conscious of the need for environmental management, SR behaviour, and sustainable growth and development. International Standards are becoming more significant for corporations to work towards common environmental management practices. ISO 14001 is the first and the broadest standard intended at a more responsible approach of corporations and the world’s most acknowledged framework for environmental management systems that assists corporations to better manage the effect of their activities on the environment. This article aims to study ISO 14001 implementation and its effects on the environmental responsibility. A model will be built, which covers the environmental management system, the components of organizational culture, being able to influence environmental standards implementation.

  1. Modeling Supermarket Refrigeration Systems for Demand-Side Management

    Directory of Open Access Journals (Sweden)

    Jakob Stoustrup

    2013-02-01

    Full Text Available Modeling of supermarket refrigeration systems for supervisory control in the smart grid is presented in this paper. A modular modeling approach is proposed in which each module is modeled and identified separately. The focus of the work is on estimating the power consumption of the system while estimating the cold reservoir temperatures as well. The models developed for each module as well as for the overall integrated system are validated by real data collected from a supermarket in Denmark. The results show that the model is able to estimate the actual electrical power consumption with a high fidelity. Moreover a simulation benchmark is introduced based on the produced model for demand-side management in smart grid. Finally, a potential application of the proposed benchmark in direct control of the power/energy consumption is presented by a simple simulation example.

  2. System modelling and energy management for grid connected PV systems associated with storage

    OpenAIRE

    Riffonneau , Yann; DELAILLE , Arnaud; Barruel , Franck; Bacha , Seddik

    2008-01-01

    International audience; This paper presents the modelling and energy management of a grid connected PV system associatedwith storage. Within the economic, energetic and environmental context, objective of the system is to ensure loadssupply at the least cost by optimising the use of solar power. Therefore, due to the complicated operating patterns, anenergy management system which decides on energy flow for any moment is necessary. First, we present the systemstudied. Based on an AC bus typol...

  3. Knowledge Management System Untuk SDM Menggunakan Seci Model (Studi Kasus: Koperasi Karyawan

    Directory of Open Access Journals (Sweden)

    Eva Zuraidah

    2018-04-01

    Full Text Available Abstrak Koperasi Pegawai Badan Urusan Logistik adalah sebuah Koperasi yang bergerak dalam bidang jasa, simpan-pinjam. Knowledge Managment System tersebut, nampaknya sudah menjadi suatu kebutuhan mendasarkan untuk meningkatkan kualitas sumber daya manusia yang khususnya kepada karyawan. Knowledge management merupakan usaha untuk meningkatkan knowledge yang berguna dalam koperasi. Knowledge management tidak hanya merupakan pengaturan akan knowldge, namun lebih pada manajemen suatu koperasi dengan fokus khususnya terhadap knowledge, knowledge management dengan sebuah sistem, yang diharapkan dapat menjadi solusi dari kebutuhan aliran knowledge yang tidak dihalangi oleh batasan waktu dan tempat. Penelitian ini akan mengembangkan analisa knowledge management system dan merancang aplikasi dari analisa yang dikembangkan. Metodologi yang digunakan dengan model SECI dan melakukan analisa untuk mendapatkan knowledge management system tersebut. Analisa knowledge management system yang dihasilkan mendukung proses Sosialisasi, Eksternalisasi, Kombinasi, Internalisasi (SECI. Knowledge management system ini dikembangkan sebagai sarana sharing pada karyawan. Kata kunci: Knowledge Management System,SECI, Koperasi,SDM Abstract Employee Cooperative Agency of Logistics Affairs is a cooperative engaged in services, savings, and loans. Knowledge Managment System, it seems to have become a basic need to improve the quality of human resources, especially to employees. Knowledge management is an attempt to improve knowledge useful in cooperatives. Knowledge management is not only an arrangement of knowledge but rather the management of a cooperative with a particular focus on knowledge, knowledge management with a system, which is expected to be a solution of the needs of the flow of knowledge that is not hindered by time and space constraints. This research will develop the knowledge management system and design the application of the developed analysis. The methodology

  4. APPLICATION OF IMPRECISE MODELS IN ANALYSIS OF RISK MANAGEMENT OF SOFTWARE SYSTEMS

    Directory of Open Access Journals (Sweden)

    Volodymyr Kharchenko

    2017-11-01

    Full Text Available The analysis of functional completeness for existing detection systems was conducted. It made it possible to define information systems with a similar feature set, to assess the degree of similarity and the matching degree of the means from the "standard" model of risk management system, that considers the recommended ICAO practices and standards on aviation safety, to justify the advisability of decision-making support system creation, using imprecise model and imprecise logic for risk analysis at aviation activities. Imprecise models have a number of features regarding the possibility of taking into account the experts’ intuition and experience, the possibility of more adequate flight safety management processes modelling and obtaining the accurate decisions that correlate with the initial data; support for the rapid development of a safety management system with its further functionality complexity increase; their hardware and software implementation in control systems and decision making is less sophisticated in comparison with classical algorithms.

  5. Quality management system

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Mu Sung

    2009-08-15

    This book deals with ISO9001 quality management system which includes summary of this system such as classification of quality, principle of quality management, and definition, requirement and procedure of quality management system, introduction of ISO9001 system like model of ISO9001 quality management system, ISO certificate system, structure of ISO9001 standard, requirement of ISO9001 quality management system, process approach and documentation of system, propel cases of ISO9001 quality management system.

  6. Quality management system

    International Nuclear Information System (INIS)

    Lee, Mu Sung

    2009-08-01

    This book deals with ISO9001 quality management system which includes summary of this system such as classification of quality, principle of quality management, and definition, requirement and procedure of quality management system, introduction of ISO9001 system like model of ISO9001 quality management system, ISO certificate system, structure of ISO9001 standard, requirement of ISO9001 quality management system, process approach and documentation of system, propel cases of ISO9001 quality management system.

  7. The design and implementation of a visual user interface for a structured model management system

    OpenAIRE

    O'Dell, David D.

    1988-01-01

    In the scheme of an integrated decision support system, model management holds a position comparable with data management. Unfortunately, the development and formalizing of model management techniques historically have lagged far behind data management concepts, although the increased interest in spreadsheets has rekindled an interest in models as productivity enhancing tools. Model management systems offer one way of integrating models into the overall structure of an organizational informat...

  8. A Structural Model Decomposition Framework for Systems Health Management

    Science.gov (United States)

    Roychoudhury, Indranil; Daigle, Matthew J.; Bregon, Anibal; Pulido, Belamino

    2013-01-01

    Systems health management (SHM) is an important set of technologies aimed at increasing system safety and reliability by detecting, isolating, and identifying faults; and predicting when the system reaches end of life (EOL), so that appropriate fault mitigation and recovery actions can be taken. Model-based SHM approaches typically make use of global, monolithic system models for online analysis, which results in a loss of scalability and efficiency for large-scale systems. Improvement in scalability and efficiency can be achieved by decomposing the system model into smaller local submodels and operating on these submodels instead. In this paper, the global system model is analyzed offline and structurally decomposed into local submodels. We define a common model decomposition framework for extracting submodels from the global model. This framework is then used to develop algorithms for solving model decomposition problems for the design of three separate SHM technologies, namely, estimation (which is useful for fault detection and identification), fault isolation, and EOL prediction. We solve these model decomposition problems using a three-tank system as a case study.

  9. A structural model decomposition framework for systems health management

    Science.gov (United States)

    Roychoudhury, I.; Daigle, M.; Bregon, A.; Pulido, B.

    Systems health management (SHM) is an important set of technologies aimed at increasing system safety and reliability by detecting, isolating, and identifying faults; and predicting when the system reaches end of life (EOL), so that appropriate fault mitigation and recovery actions can be taken. Model-based SHM approaches typically make use of global, monolithic system models for online analysis, which results in a loss of scalability and efficiency for large-scale systems. Improvement in scalability and efficiency can be achieved by decomposing the system model into smaller local submodels and operating on these submodels instead. In this paper, the global system model is analyzed offline and structurally decomposed into local submodels. We define a common model decomposition framework for extracting submodels from the global model. This framework is then used to develop algorithms for solving model decomposition problems for the design of three separate SHM technologies, namely, estimation (which is useful for fault detection and identification), fault isolation, and EOL prediction. We solve these model decomposition problems using a three-tank system as a case study.

  10. Management information system model supporting the quality assurance of schools in Thailand

    Directory of Open Access Journals (Sweden)

    Daoprakai Raso

    2017-07-01

    Full Text Available Management Information Systems are very important tools for Thai Schools in supporting the quality assurance process. This research therefore aimed to develop a Management Information System (MIS model which consisted of two phases. Phase 1 was the design of MIS model used in Thai school quality assurance (QA. Phase 2 was the evaluation of the model which consisted of four parts. There were the MIS circle which consisted of 1 System Investigation, System Analysis, System Design, System Implementation and System Maintenance. 2 The Management Information System, which consisted of data collecting, data processing, information presenting, information saving, and procedure controlling. 3 The factors that support the MIS, which includes information tools and equipment used factor and the information operator’s factor, and 4 the system theory which consisted of input, process, and output. The results showed that the level of opinions in all aspects was at a “high” level.

  11. Research on Knowledge-Oriented Supply ChainRisk Management System Model

    OpenAIRE

    Yingchun Guo

    2011-01-01

    Based on analyzing the characteristics of supply chain risk management under the influences of knowledge, in this paper integrates basic theories and methods of knowledge management into the process of risk management, builds a knowledge-oriented supply chain risk management system model, and proposes relevant strategies, presenting references for practical application of knowledge-oriented supply chain risk management. By means of acquiring, storing, sharing, and transferring supply chain ri...

  12. Water balance modelling of a uranium mill effluent management system

    Science.gov (United States)

    Plagnes, Valérie; Schmid, Brad; Mitchell, Brett; Judd-Henrey, Ian

    2017-06-01

    A water balance model was developed to forecast the management strategy of a uranium mill effluent system, located in northern Saskatchewan, Canada. Mining and milling operations, such as pit dewatering or treated effluent release, can potentially influence the hydrology and the water quality downstream of the operations. This study presents the methodology used to predict water volumes and water quality discharging downstream in surface water bodies. A compartment model representing the three subsequent lakes included in the management system was set up using the software GoldSim®. The water balance allows predicting lake volumes at the daily time step. A mass balance model developed for conservative elements was also developed and allows validating the proportions of inputs and outputs issued from the water balance model. This model was then used as predictive tool to evaluate the impact of different scenarios of effluents management on volumes and chemistry of surface water for short and longer time periods. An additional significant benefit of this model is that it can be used as an input for geochemical modelling to predict the concentrations of all constituents of concern in the receiving surface water.

  13. Waste management system optimisation for Southern Italy with MARKAL model

    Energy Technology Data Exchange (ETDEWEB)

    Salvia, M.; Cosmi, C. [Istituto di Metodologie Avanzate di Analisi Ambientale, Consiglio Nazionale delle Ricerche, C. da S. Loja, 85050 (PZ) Tito Scalo (Italy); Macchiato, M. [Dipartimento di Scienze Fisiche, Universita Federico II, Via Cintia, 80126 Napoli (Italy); Mangiamele, L. [Dipartimento di Ingegneria e Fisica dell' Ambiente, Universita degli Studi della Basilicata, C. da Macchia Romana, 85100 Potenza (Italy)

    2002-01-01

    The MARKAL models generator was utilised to build up a comprehensive model of the anthropogenic activities system which points out the linkages between productive processes and waste disposal technologies. The aim of such a study is to determine the optimal configuration of the waste management system for the Basilicata region (Southern Italy), in order to support the definition of the regional waste management plan in compliance with the Italian laws. A sensitivity analysis was performed to evaluate the influence of landfilling fees on the choice of waste processing technologies, in order to foster waste management strategies which are environmentally sustainable, economically affordable and highly efficient. The results show the key role of separate collection and mechanical pre-treatments in the achievement of the legislative targets.

  14. Research on Trust Propagation Models in Reputation Management Systems

    Directory of Open Access Journals (Sweden)

    Zhiyuan Su

    2014-01-01

    Full Text Available Feedback based reputation systems continue to gain popularity in eCommerce and social media systems today and reputation management in large social networks needs to manage cold start and sparseness in terms of feedback. Trust propagation has been widely recognized as an effective mechanism to handle these problems. In this paper we study the characterization of trust propagation models in the context of attack resilience. We characterize trust propagation models along three dimensions: (i uniform propagation and conditional propagation, (ii jump strategies for breaking unwanted cliques, and (iii decay factors for differentiating recent trust history from remote past history. We formally and experimentally show that feedback similarity is a critical measure for countering colluding attacks in reputation systems. Without feedback similarity guided control, trust propagations are vulnerable to different types of colluding attacks.

  15. An energy security management model using quality function deployment and system dynamics

    International Nuclear Information System (INIS)

    Shin, Juneseuk; Shin, Wan-Seon; Lee, Changyong

    2013-01-01

    An energy security management model using quality function deployment (QFD) and system dynamics (SD) is suggested for application in public policymaking in developing economies. Through QFD, experts are guided toward identifying key energy security components, including indicators and policies, and in making these components consistent, focused, and customized for a particular country. Using these components as inputs, we construct an intermediate complex system dynamics model with a minimal number of crucial interactions. Key policies are simulated and evaluated in terms of the improvement of key indicators. Even with little data, our approach provides a coherent, useful, and customized energy security management model to help policymakers more effectively manage national energy security. To demonstrate its advantages, the model is applied to the Korean gas sector as an example. - Highlights: ► We suggest an energy security management model for developing economies. ► We identify a consistent set of key components, indicators and policies by using QFD. ► A coherent and practical system dynamics model based on QFD's output is constructed. ► The model is applied to the Korean gas sector as an example

  16. Fuzzy expert systems models for operations research and management science

    Science.gov (United States)

    Turksen, I. B.

    1993-12-01

    Fuzzy expert systems can be developed for the effective use of management within the domains of concern associated with Operations Research and Management Science. These models are designed with: (1) expressive powers of representation embedded in linguistic variables and their linguistic values in natural language expressions, and (2) improved methods of interference based on fuzzy logic which is a generalization of multi-valued logic with fuzzy quantifiers. The results of these fuzzy expert system models are either (1) approximately good in comparison with their classical counterparts, or (2) much better than their counterparts. Moreover, for fuzzy expert systems models, it is only necessary to obtain ordinal scale data. Whereas for their classical counterparts, it is generally required that data be at least on ratio and absolute scale in order to guarantee the additivity and multiplicativity assumptions.

  17. Presenting of Indifference Management Model of Education System in Ardabil Province Using Structural Equation Modeling

    Science.gov (United States)

    Abolfazli, Elham; Saidabadi, Reza Yousefi; Fallah, Vahid

    2016-01-01

    The purpose of the present study is to investigate indifference management structural model in education system of Ardabil Province. The research method was integration study using Alli modeling. Statistical society of research was 420 assistant professors of educational science, managers, and deputies of Ardabil's second period of high schools…

  18. Sustainable Dry Land Management Model on Corn Agribusiness System

    Directory of Open Access Journals (Sweden)

    Yulia Pujiharti

    2008-01-01

    Full Text Available The study aimed at building model of dry land management. Dynamic System Analysis was used to build model and Powersim 2.51 version for simulating. The parameter used in model were fertilizer (urea, SP-36, ACL, productivity (corn, cassava, mungbean, soil nutrient (N, P, K, crop nutrient requirements (corn, cassava, mungbean, mucuna, price (corn, cassava, mungbeans corn flour, feed, urea, SP-36, KCl, food security credit, area planted of (maize, cassava, mungbean, area harvested of (maize, cassava, mungbean, (corn, cassava, mungbean production, wages and farmer income. Sustainable indicator for ecology aspect was soil fertility level, economic aspects were productivity and farmer income, and social aspects were job possibility and traditions. The simulation result indicated that sustainable dry land management can improve soil fertility and increase farmer revenue, became sustainable farming system and farmer society. On the other hand, conventional dry land management decreased soil fertility and yield, caused farmer earnings to decrease and a farm activity could not be continued. Fertilizer distribution did not fulfill farmer requirement, which caused fertilizer scarcity. Food security credit increased fertilizer application. Corn was processed to corn flour or feed to give value added.

  19. ABOUT THE INFORMATIZATION MANAGING OF THE PRODUCTION SYSTEM BASED ON THE MATRIX MODEL

    Directory of Open Access Journals (Sweden)

    Aleksandr V. Romanenko

    2016-06-01

    Full Text Available Introduction. The problem of formation and information management systems management of manufacturing system businesses is analyzed in the article. Existing schemes of the Russian economy increased demands for its efficiency. Stability integrative model business entity lifecycle requires a search for solutions based on new technologies in the organization and operation of information management systems. Results. On the basis of the analysis of their importance for sustainability of the entity components of its life cycle conclusions are made about the applicability of the matrix model to the production system management. Contradiction in the application of this management model are solved by separating the information on the basis of the state of product and process state. This division contributes to a better organization of the distribution of responsibility between the profit centers and cost centers. As an indicator of the efficiency of profit centers, it is proposed to use the ratio revenue net from the sale of products to the current value of the planned costs of its production. To assess the effectiveness of cost centers used index that is similar to profitability of fixed assets taking into account the cost of resources utilized by each cost center separately. Discussion and Conclusions. We analyze the relationship between goals management of the production system with the role of profit centers and cost centers. The proposed basis of the formation model information ensures the management of the production system, contributing to improve the quality of managerial decisions in implementing the competitive advantages of business entity.

  20. The maintenance management framework models and methods for complex systems maintenance

    CERN Document Server

    Crespo Márquez, Adolfo

    2010-01-01

    “The Maintenance Management Framework” describes and reviews the concept, process and framework of modern maintenance management of complex systems; concentrating specifically on modern modelling tools (deterministic and empirical) for maintenance planning and scheduling. It will be bought by engineers and professionals involved in maintenance management, maintenance engineering, operations management, quality, etc. as well as graduate students and researchers in this field.

  1. CONFIG - Adapting qualitative modeling and discrete event simulation for design of fault management systems

    Science.gov (United States)

    Malin, Jane T.; Basham, Bryan D.

    1989-01-01

    CONFIG is a modeling and simulation tool prototype for analyzing the normal and faulty qualitative behaviors of engineered systems. Qualitative modeling and discrete-event simulation have been adapted and integrated, to support early development, during system design, of software and procedures for management of failures, especially in diagnostic expert systems. Qualitative component models are defined in terms of normal and faulty modes and processes, which are defined by invocation statements and effect statements with time delays. System models are constructed graphically by using instances of components and relations from object-oriented hierarchical model libraries. Extension and reuse of CONFIG models and analysis capabilities in hybrid rule- and model-based expert fault-management support systems are discussed.

  2. Influence of the management strategy model on estimating water system performance under climate change

    Science.gov (United States)

    Francois, Baptiste; Hingray, Benoit; Creutin, Jean-Dominique; Hendrickx, Frederic

    2015-04-01

    The performance of water systems used worldwide for the management of water resources is expected to be influenced by future changes in regional climates and water uses. Anticipating possible performance changes of a given system requires a modeling chain simulating its management. Operational management is usually not trivial especially when several conflicting objectives have to be accounted for. Management models are therefore often a crude representation of the real system and they only approximate its performance. Estimated performance changes are expected to depend on the management model used, but this is often not assessed. This communication analyzes the influence of the management strategy representation on the performance of an Alpine reservoir (Serre-Ponçon, South-East of France) for which irrigation supply, hydropower generation and recreational activities are the main objectives. We consider three ways to construct the strategy named as clear-, short- and far-sighted management. They are based on different forecastability degrees of seasonal inflows into the reservoir. The strategies are optimized using a Dynamic Programming algorithm (deterministic for clear-sighted and implicit stochastic for short- and far-sighted). System performance is estimated for an ensemble of future hydro-meteorological projections obtained in the RIWER2030 research project (http://www.lthe.fr/RIWER2030/) from a suite of climate experiments from the EU - ENSEMBLES research project. Our results show that changes in system performance is much more influenced by changes in hydro-meteorological variables than by the choice of strategy modeling. They also show that a simple strategy representation (i.e. clear-sighted management) leads to similar estimates of performance modifications than those obtained with a representation supposedly closer to real world (i.e. the far-sighted management). The Short-Sighted management approach lead to significantly different results, especially

  3. Explanation of model design and talent management system in universities

    OpenAIRE

    AH Nazaripour; SNJ Mosavi; M Hakak; A Pirzad

    2017-01-01

    Abstract Background and aim: Nowadays talented human resources are considerd as the most important and valuable organizational asset. Proper management of these major asset, the the most essential task manager and the progress of any organization in this field is fierce competition with competitor. The aim of this study was to develop a model system for talent management in universities in the country. Methods: In this study the population was composed of 10 Azad Univers...

  4. Waste management systems model for energy systems sites on the Oak Ridge Reservation

    International Nuclear Information System (INIS)

    Rodgers, B.R.; Nehls, J.W. Jr.; Rivera, A.L.; Pechin, W.H.; Genung, R.K.

    1987-01-01

    The Oak Ridge Model (ORM) is a DOE/Oak Ridge Operations (DOE/ORO) initiative which involves regulators and the public at the problem definition stage to attempt to reach a consensus on acceptable approaches to the solution of waste management problems. Once the approaches have been defined, the private sector participates in identifying and demonstrating the technologies to be employed. The Waste Management Systems Model (WSM), a major part of the ORM, is discussed in this paper. It can be generically described as employing a number of computer models to: 1. determine waste management requirements (e.g., capabilities and capacities); 2. develop scenarios that respond to changes in requirements and that evaluate alternatives as they become available; 3. compare these scenarios technically, operationally, and financially; and 4. select the most promising technologies for demonstration. 12 figures

  5. Designing a Model for Trauma System Management Using Public Health Approach: The Case of Iran

    Directory of Open Access Journals (Sweden)

    Farzad Panahi

    2012-01-01

    Full Text Available Trauma is a leading cause of death and disability around the world. Injuries are responsible for about six million deaths annually, of which ninety percent occur in developing countries. In Iran, injuries are the most common cause of death among age groups below fifty. Trauma system development is a systematic and comprehensive approach to injury prevention and treatment whose effectiveness has been proved. The present study aims at designing a trauma system management model as the first step toward trauma system establishment in Iran. In this qualitative research, a conceptual framework was developed based on the public health approach and three well-known trauma system models. We used Benchmarks, Indicators and Scoring (BIS to analyze the current situation of Iran trauma care system. Then the trauma system management was designed using the policy development phase of public health approach The trauma system management model, validated by a panel of experts, describes lead agency, trauma system plan, policy-making councils, and data-based control according to the four main functions of management: leading, planning, organizing and controlling. This model may be implemented in two phases: the exclusive phase, focusing on resource integration and the inclusive phase, which concentrates on system development. The model could facilitate the development of trauma system in Iran through pilot studies as the assurance phase of public health approach. Furthermore, the model can provide a practical framework for trauma system management at the international level.

  6. Model-Based Battery Management Systems: From Theory to Practice

    Science.gov (United States)

    Pathak, Manan

    Lithium-ion batteries are now extensively being used as the primary storage source. Capacity and power fade, and slow recharging times are key issues that restrict its use in many applications. Battery management systems are critical to address these issues, along with ensuring its safety. This dissertation focuses on exploring various control strategies using detailed physics-based electrochemical models developed previously for lithium-ion batteries, which could be used in advanced battery management systems. Optimal charging profiles for minimizing capacity fade based on SEI-layer formation are derived and the benefits of using such control strategies are shown by experimentally testing them on a 16 Ah NMC-based pouch cell. This dissertation also explores different time-discretization strategies for non-linear models, which gives an improved order of convergence for optimal control problems. Lastly, this dissertation also explores a physics-based model for predicting the linear impedance of a battery, and develops a freeware that is extremely robust and computationally fast. Such a code could be used for estimating transport, kinetic and material properties of the battery based on the linear impedance spectra.

  7. MODELS AND METHODS OF SAFETY-ORIENTED PROJECT MANAGEMENT OF DEVELOPMENT OF COMPLEX SYSTEMS: METHODOLOGICAL APPROACH

    Directory of Open Access Journals (Sweden)

    Олег Богданович ЗАЧКО

    2016-03-01

    Full Text Available The methods and models of safety-oriented project management of the development of complex systems are proposed resulting from the convergence of existing approaches in project management in contrast to the mechanism of value-oriented management. A cognitive model of safety oriented project management of the development of complex systems is developed, which provides a synergistic effect that is to move the system from the original (pre condition in an optimal one from the viewpoint of life safety - post-project state. The approach of assessment the project complexity is proposed, which consists in taking into account the seasonal component of a time characteristic of life cycles of complex organizational and technical systems with occupancy. This enabled to take into account the seasonal component in simulation models of life cycle of the product operation in complex organizational and technical system, modeling the critical points of operation of systems with occupancy, which forms a new methodology for safety-oriented management of projects, programs and portfolios of projects with the formalization of the elements of complexity.

  8. Performance Models and Risk Management in Communications Systems

    CERN Document Server

    Harrison, Peter; Rüstem, Berç

    2011-01-01

    This volume covers recent developments in the design, operation, and management of telecommunication and computer network systems in performance engineering and addresses issues of uncertainty, robustness, and risk. Uncertainty regarding loading and system parameters leads to challenging optimization and robustness issues. Stochastic modeling combined with optimization theory ensures the optimum end-to-end performance of telecommunication or computer network systems. In view of the diverse design options possible, supporting models have many adjustable parameters and choosing the best set for a particular performance objective is delicate and time-consuming. An optimization based approach determines the optimal possible allocation for these parameters. Researchers and graduate students working at the interface of telecommunications and operations research will benefit from this book. Due to the practical approach, this book will also serve as a reference tool for scientists and engineers in telecommunication ...

  9. Goal-Function Tree Modeling for Systems Engineering and Fault Management

    Science.gov (United States)

    Johnson, Stephen B.; Breckenridge, Jonathan T.

    2013-01-01

    The draft NASA Fault Management (FM) Handbook (2012) states that Fault Management (FM) is a "part of systems engineering", and that it "demands a system-level perspective" (NASAHDBK- 1002, 7). What, exactly, is the relationship between systems engineering and FM? To NASA, systems engineering (SE) is "the art and science of developing an operable system capable of meeting requirements within often opposed constraints" (NASA/SP-2007-6105, 3). Systems engineering starts with the elucidation and development of requirements, which set the goals that the system is to achieve. To achieve these goals, the systems engineer typically defines functions, and the functions in turn are the basis for design trades to determine the best means to perform the functions. System Health Management (SHM), by contrast, defines "the capabilities of a system that preserve the system's ability to function as intended" (Johnson et al., 2011, 3). Fault Management, in turn, is the operational subset of SHM, which detects current or future failures, and takes operational measures to prevent or respond to these failures. Failure, in turn, is the "unacceptable performance of intended function." (Johnson 2011, 605) Thus the relationship of SE to FM is that SE defines the functions and the design to perform those functions to meet system goals and requirements, while FM detects the inability to perform those functions and takes action. SHM and FM are in essence "the dark side" of SE. For every function to be performed (SE), there is the possibility that it is not successfully performed (SHM); FM defines the means to operationally detect and respond to this lack of success. We can also describe this in terms of goals: for every goal to be achieved, there is the possibility that it is not achieved; FM defines the means to operationally detect and respond to this inability to achieve the goal. This brief description of relationships between SE, SHM, and FM provide hints to a modeling approach to

  10. Development of the Mathematical Model of Integrated Management System for an Airline

    Directory of Open Access Journals (Sweden)

    Bogdane Ruta

    2016-12-01

    Full Text Available At the present stage of airline development the most effective way to increase safety is to introduce a systematic approach to the management of the organization. The creation of a single integrated management system including the combination of resources will make it possible to maintain the necessary level of quality of aviation services with safety as a key indicator. The article offers a model of such an integrated management system for medium level airlines.

  11. Information Technology Management System: an Analysis on Computational Model Failures for Fleet Management

    Directory of Open Access Journals (Sweden)

    Jayr Figueiredo de Oliveira

    2013-10-01

    Full Text Available This article proposes an information technology model to evaluate fleet management failure. Qualitative research done by a case study within an Interstate Transport company in a São Paulo State proposed to establish a relationship between computer tools and valid trustworthy information needs, and within an acceptable timeframe, for decision making, reliability, availability and system management. Additionally, the study aimed to provide relevant and precise information, in order to minimize and mitigate failure actions that may occur, compromising all operational organization base functioning.

  12. Earth-Mars Telecommunications and Information Management System (TIMS): Antenna Visibility Determination, Network Simulation, and Management Models

    Science.gov (United States)

    Odubiyi, Jide; Kocur, David; Pino, Nino; Chu, Don

    1996-01-01

    This report presents the results of our research on Earth-Mars Telecommunications and Information Management System (TIMS) network modeling and unattended network operations. The primary focus of our research is to investigate the feasibility of the TIMS architecture, which links the Earth-based Mars Operations Control Center, Science Data Processing Facility, Mars Network Management Center, and the Deep Space Network of antennae to the relay satellites and other communication network elements based in the Mars region. The investigation was enhanced by developing Build 3 of the TIMS network modeling and simulation model. The results of several 'what-if' scenarios are reported along with reports on upgraded antenna visibility determination software and unattended network management prototype.

  13. System Architecture Modeling for Technology Portfolio Management using ATLAS

    Science.gov (United States)

    Thompson, Robert W.; O'Neil, Daniel A.

    2006-01-01

    Strategic planners and technology portfolio managers have traditionally relied on consensus-based tools, such as Analytical Hierarchy Process (AHP) and Quality Function Deployment (QFD) in planning the funding of technology development. While useful to a certain extent, these tools are limited in the ability to fully quantify the impact of a technology choice on system mass, system reliability, project schedule, and lifecycle cost. The Advanced Technology Lifecycle Analysis System (ATLAS) aims to provide strategic planners a decision support tool for analyzing technology selections within a Space Exploration Architecture (SEA). Using ATLAS, strategic planners can select physics-based system models from a library, configure the systems with technologies and performance parameters, and plan the deployment of a SEA. Key parameters for current and future technologies have been collected from subject-matter experts and other documented sources in the Technology Tool Box (TTB). ATLAS can be used to compare the technical feasibility and economic viability of a set of technology choices for one SEA, and compare it against another set of technology choices or another SEA. System architecture modeling in ATLAS is a multi-step process. First, the modeler defines the system level requirements. Second, the modeler identifies technologies of interest whose impact on an SEA. Third, the system modeling team creates models of architecture elements (e.g. launch vehicles, in-space transfer vehicles, crew vehicles) if they are not already in the model library. Finally, the architecture modeler develops a script for the ATLAS tool to run, and the results for comparison are generated.

  14. System dynamic modeling on construction waste management in Shenzhen, China.

    Science.gov (United States)

    Tam, Vivian W Y; Li, Jingru; Cai, Hong

    2014-05-01

    This article examines the complexity of construction waste management in Shenzhen, Mainland China. In-depth analysis of waste generation, transportation, recycling, landfill and illegal dumping of various inherent management phases is explored. A system dynamics modeling using Stella model is developed. Effects of landfill charges and also penalties from illegal dumping are also simulated. The results show that the implementation of comprehensive policy on both landfill charges and illegal dumping can effectively control the illegal dumping behavior, and achieve comprehensive construction waste minimization. This article provides important recommendations for effective policy implementation and explores new perspectives for Shenzhen policy makers.

  15. A Model for Systemic Change Management in Education

    Directory of Open Access Journals (Sweden)

    Marylu Menchaca

    2004-02-01

    Full Text Available Based on an understanding of systems thinking as practiced by successful learning organizations and derived from large-scale projects in technology-assisted teaching and learning in Mexico and Germany, we have developed a model that offers guidance to educational institutions and organizations to support their transition from lecture-based, face-to-face teaching to interactive learner-centered eLearning. As the basis for the model, we analyzed the systemic change processes of two major educational institutions: the largest private institution of higher education in Latin America, Instituto Tecnologico de Estudios Superiores de Monterrey (ITESM, a leading nationwide educational system of international scope with 33 branches in 27 cities throughout Mexico, and the federal flagship project in Germany, Virtuelle Fachhochschule (VFH, the Virtual University of Applied Sciences, a virtual organization with decentralized and distributed management and participants from twelve universities of applied sciences, two universities, the federal employers

  16. Risk management model in road transport systems

    Science.gov (United States)

    Sakhapov, R. L.; Nikolaeva, R. V.; Gatiyatullin, M. H.; Makhmutov, M. M.

    2016-08-01

    The article presents the results of a study of road safety indicators that influence the development and operation of the transport system. Road safety is considered as a continuous process of risk management. Authors constructed a model that relates the social risks of a major road safety indicator - the level of motorization. The model gives a fairly accurate assessment of the level of social risk for any given level of motorization. Authors calculated the dependence of the level of socio-economic costs of accidents and injured people in them. The applicability of the concept of socio-economic damage is caused by the presence of a linear relationship between the natural and economic indicators damage from accidents. The optimization of social risk is reduced to finding the extremum of the objective function that characterizes the economic effect of the implementation of measures to improve safety. The calculations make it possible to maximize the net present value, depending on the costs of improving road safety, taking into account socio-economic damage caused by accidents. The proposed econometric models make it possible to quantify the efficiency of the transportation system, allow to simulate the change in road safety indicators.

  17. Information system success model for customer relationship management system in health promotion centers.

    Science.gov (United States)

    Choi, Wona; Rho, Mi Jung; Park, Jiyun; Kim, Kwang-Jum; Kwon, Young Dae; Choi, In Young

    2013-06-01

    Intensified competitiveness in the healthcare industry has increased the number of healthcare centers and propelled the introduction of customer relationship management (CRM) systems to meet diverse customer demands. This study aimed to develop the information system success model of the CRM system by investigating previously proposed indicators within the model. THE EVALUATION AREAS OF THE CRM SYSTEM INCLUDES THREE AREAS: the system characteristics area (system quality, information quality, and service quality), the user area (perceived usefulness and user satisfaction), and the performance area (personal performance and organizational performance). Detailed evaluation criteria of the three areas were developed, and its validity was verified by a survey administered to CRM system users in 13 nationwide health promotion centers. The survey data were analyzed by the structural equation modeling method, and the results confirmed that the model is feasible. Information quality and service quality showed a statistically significant relationship with perceived usefulness and user satisfaction. Consequently, the perceived usefulness and user satisfaction had significant influence on individual performance as well as an indirect influence on organizational performance. This study extends the research area on information success from general information systems to CRM systems in health promotion centers applying a previous information success model. This lays a foundation for evaluating health promotion center systems and provides a useful guide for successful implementation of hospital CRM systems.

  18. Information System Success Model for Customer Relationship Management System in Health Promotion Centers

    Science.gov (United States)

    Choi, Wona; Rho, Mi Jung; Park, Jiyun; Kim, Kwang-Jum; Kwon, Young Dae

    2013-01-01

    Objectives Intensified competitiveness in the healthcare industry has increased the number of healthcare centers and propelled the introduction of customer relationship management (CRM) systems to meet diverse customer demands. This study aimed to develop the information system success model of the CRM system by investigating previously proposed indicators within the model. Methods The evaluation areas of the CRM system includes three areas: the system characteristics area (system quality, information quality, and service quality), the user area (perceived usefulness and user satisfaction), and the performance area (personal performance and organizational performance). Detailed evaluation criteria of the three areas were developed, and its validity was verified by a survey administered to CRM system users in 13 nationwide health promotion centers. The survey data were analyzed by the structural equation modeling method, and the results confirmed that the model is feasible. Results Information quality and service quality showed a statistically significant relationship with perceived usefulness and user satisfaction. Consequently, the perceived usefulness and user satisfaction had significant influence on individual performance as well as an indirect influence on organizational performance. Conclusions This study extends the research area on information success from general information systems to CRM systems in health promotion centers applying a previous information success model. This lays a foundation for evaluating health promotion center systems and provides a useful guide for successful implementation of hospital CRM systems. PMID:23882416

  19. Application of SADT and ARIS methodologies for modeling and management of business processes of information systems

    Directory of Open Access Journals (Sweden)

    O. V. Fedorova

    2018-01-01

    Full Text Available The article is devoted to application of SADT and ARIS methodologies for modeling and management of business processes of information systems. The relevance of this article is beyond doubt, because the design of the architecture of information systems, based on a thorough system analysis of the subject area, is of paramount importance for the development of information systems in general. The authors conducted a serious work on the analysis of the application of SADT and ARIS methodologies for modeling and managing business processes of information systems. The analysis was carried out both in terms of modeling business processes (notation and applying the CASE-tool, and in terms of business process management. The first point of view reflects the interaction of the business analyst and the programmer in the development of the information system. The second point of view is the interaction of the business analyst and the customer. The basis of many modern methodologies for modeling business processes is the SADT methodology. Using the methodology of the IDEF family, it is possible to efficiently display and analyze the activity models of a wide range of complex information systems in various aspects. CASE-tool ARIS is a complex of tools for analysis and modeling of the organization's activities. The methodical basis of ARIS is a set of different modeling methods that reflect different views on the system under study. The authors' conclusions are fully justified. The results of the work can be useful for specialists in the field of modeling business processes of information systems. In addition, the article has an oriented character when working on the constituent elements of curricula for students specializing in information specialties and management, provides an update of the content and structure of disciplines on modeling the architecture of information systems and organization management, using models.

  20. Multimedia Modeling System Response to Regional Land Management Change

    Science.gov (United States)

    Cooter, E. J.

    2015-12-01

    A multi-media system of nitrogen and co-pollutant models describing critical physical and chemical processes that cascade synergistically and competitively through the environment, the economy and society has been developed at the USEPA Office of Research and Development. It is populated with linked or fully coupled models that address nutrient research questions such as, "How might future policy, climate or land cover change in the Mississippi River Basin affect Nitrogen and Phosphorous loadings to the Gulf of Mexico" or, "What are the management implications of regional-scale land management changes for the sustainability of air, land and water quality?" This second question requires explicit consideration of economic (e.g. sector prices) and societal (e.g. land management) factors. Metrics that illustrate biosphere-atmosphere interactions such as atmospheric PM2.5 concentrations, atmospheric N loading to surface water, soil organic N and N percolation to groundwater are calculated. An example application has been completed that is driven by a coupled agricultural and energy sector model scenario. The economic scenario assumes that by 2022 there is: 1) no detectable change in weather patterns relative to 2002; 2) a concentration of stover processing facilities in the Upper Midwest; 3) increasing offshore Pacific and Atlantic marine transportation; and 4) increasing corn, soybean and wheat production that meets future demand for food, feed and energy feedstocks. This production goal is reached without adding or removing agricultural land area whose extent is defined by the National Land Cover Dataset (NLCD) 2002v2011 classes 81 and 82. This goal does require, however, crop shifts and agricultural management changes. The multi-media system response over our U.S. 12km rectangular grid resolution analysis suggests that there are regions of potential environmental and health costs, as well as large areas that could experience unanticipated environmental and health

  1. MODELING AND IMPLEMENTATION OF A DISTRIBUTED SHOP FLOOR MANAGEMENT AND CONTROL SYSTEM

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    Adopting distributed control architecture is the important development direction for shop floor management and control system,is also the requirement of making it agile,intelligent and concurrent. Some key problems in achieving distributed control architecture are researched. An activity model of shop floor is presented as the requirement definition of the prototype system. The multi-agent based software architecture is constructed. How the core part in shop floor management and control system,production plan and scheduling is achieved. The cooperation of different agents is illustrated. Finally,the implementation of the prototype system is narrated.

  2. Modeling for Integrated Science Management and Resilient Systems Development

    Science.gov (United States)

    Shelhamer, M.; Mindock, J.; Lumpkins, S.

    2014-01-01

    Many physiological, environmental, and operational risks exist for crewmembers during spaceflight. An understanding of these risks from an integrated perspective is required to provide effective and efficient mitigations during future exploration missions that typically have stringent limitations on resources available, such as mass, power, and crew time. The Human Research Program (HRP) is in the early stages of developing collaborative modeling approaches for the purposes of managing its science portfolio in an integrated manner to support cross-disciplinary risk mitigation strategies and to enable resilient human and engineered systems in the spaceflight environment. In this talk, we will share ideas being explored from fields such as network science, complexity theory, and system-of-systems modeling. Initial work on tools to support these explorations will be discussed briefly, along with ideas for future efforts.

  3. Systems Intelligence in Knowledge Management Implementation: A Momentum of the SECI Model

    OpenAIRE

    Sasaki, Yasuo

    2014-01-01

    This paper discusses the role of systems intelligence in knowledge management implementations, in particular, in the SECI model, a widely acknowledged knowledge creation process in an organization identified by Nonaka and Takeuchi (1995). The SECI model deals with interactions and conversions of tacit knowledge and explicit knowledge and mainly consists of four stages. The author illustrates systems intelligence, a certain kind of human intelligence focusing on systems thinking perspective pr...

  4. NoSQL Based 3D City Model Management System

    Science.gov (United States)

    Mao, B.; Harrie, L.; Cao, J.; Wu, Z.; Shen, J.

    2014-04-01

    To manage increasingly complicated 3D city models, a framework based on NoSQL database is proposed in this paper. The framework supports import and export of 3D city model according to international standards such as CityGML, KML/COLLADA and X3D. We also suggest and implement 3D model analysis and visualization in the framework. For city model analysis, 3D geometry data and semantic information (such as name, height, area, price and so on) are stored and processed separately. We use a Map-Reduce method to deal with the 3D geometry data since it is more complex, while the semantic analysis is mainly based on database query operation. For visualization, a multiple 3D city representation structure CityTree is implemented within the framework to support dynamic LODs based on user viewpoint. Also, the proposed framework is easily extensible and supports geoindexes to speed up the querying. Our experimental results show that the proposed 3D city management system can efficiently fulfil the analysis and visualization requirements.

  5. Genome Modeling System: A Knowledge Management Platform for Genomics.

    Directory of Open Access Journals (Sweden)

    Malachi Griffith

    2015-07-01

    Full Text Available In this work, we present the Genome Modeling System (GMS, an analysis information management system capable of executing automated genome analysis pipelines at a massive scale. The GMS framework provides detailed tracking of samples and data coupled with reliable and repeatable analysis pipelines. The GMS also serves as a platform for bioinformatics development, allowing a large team to collaborate on data analysis, or an individual researcher to leverage the work of others effectively within its data management system. Rather than separating ad-hoc analysis from rigorous, reproducible pipelines, the GMS promotes systematic integration between the two. As a demonstration of the GMS, we performed an integrated analysis of whole genome, exome and transcriptome sequencing data from a breast cancer cell line (HCC1395 and matched lymphoblastoid line (HCC1395BL. These data are available for users to test the software, complete tutorials and develop novel GMS pipeline configurations. The GMS is available at https://github.com/genome/gms.

  6. Wind Tunnel Management and Resource Optimization: A Systems Modeling Approach

    Science.gov (United States)

    Jacobs, Derya, A.; Aasen, Curtis A.

    2000-01-01

    Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the

  7. A model for strategic selection of feeder management systems: A case study

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Hsing Hung [Faculty of Management and Administration, Macau University of Science and Technology, Avenue Wei Long, Taipa, Macau (China); Lee, Amy H.I. [Department of Industrial Management, Chung Hua University, No. 707, Sec. 2, Wu Fu Rd., Hsinchu 300 (China); Kang, He-Yau [Department of Industrial Engineering and Management, National Chin-Yi University of Technology, 35, Lane 215, Sec. 1, Chung San Rd., Taiping, Taichung 411 (China)

    2010-06-15

    The move to integrating distribution management system (DMS) and feeder management system (FMS) in China is becoming the main trend in recent years, in addition to upgrading and rebuilding existing energy management system (EMS) and DMS. However, with increasing complexity in the social environments along with rapidly changing technologies, how to select a suitable contractor and a FMS project is becoming an important issue for electric power companies. This paper first briefly introduces FMS and then lists its critical success criteria. A model that applies a multi-criteria decision-making (MCDM) method, an analytic network process (ANP) associated with benefits, opportunities, costs and risks (BOCR), is constructed to help power companies to select the most suitable FMS project. (author)

  8. Toward a food service quality management system for compliance with the Mediterranean dietary model.

    Science.gov (United States)

    Grigoroudis, Evangelos; Psaroudaki, Antonia; Diakaki, Christina

    2013-01-01

    The traditional diet of Cretan people in the 1960s is the basis of the Mediterranean dietary model. This article investigates the potential of this model to inspire proposals of meals by food-serving businesses, and suggests a methodology for the development of a quality management system, which will certify the delivery of food service according to this dietary model. The proposed methodology is built upon the principles and structure of the ISO 9001:2008 quality standard to enable integration with other quality, environmental, and food safety management systems.

  9. Intelligent Integrated System Health Management

    Science.gov (United States)

    Figueroa, Fernando

    2012-01-01

    Intelligent Integrated System Health Management (ISHM) is the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system (Management: storage, distribution, sharing, maintenance, processing, reasoning, and presentation). Presentation discusses: (1) ISHM Capability Development. (1a) ISHM Knowledge Model. (1b) Standards for ISHM Implementation. (1c) ISHM Domain Models (ISHM-DM's). (1d) Intelligent Sensors and Components. (2) ISHM in Systems Design, Engineering, and Integration. (3) Intelligent Control for ISHM-Enabled Systems

  10. DualTrust: A Trust Management Model for Swarm-Based Autonomic Computing Systems

    Energy Technology Data Exchange (ETDEWEB)

    Maiden, Wendy M. [Washington State Univ., Pullman, WA (United States)

    2010-05-01

    Trust management techniques must be adapted to the unique needs of the application architectures and problem domains to which they are applied. For autonomic computing systems that utilize mobile agents and ant colony algorithms for their sensor layer, certain characteristics of the mobile agent ant swarm -- their lightweight, ephemeral nature and indirect communication -- make this adaptation especially challenging. This thesis looks at the trust issues and opportunities in swarm-based autonomic computing systems and finds that by monitoring the trustworthiness of the autonomic managers rather than the swarming sensors, the trust management problem becomes much more scalable and still serves to protect the swarm. After analyzing the applicability of trust management research as it has been applied to architectures with similar characteristics, this thesis specifies the required characteristics for trust management mechanisms used to monitor the trustworthiness of entities in a swarm-based autonomic computing system and describes a trust model that meets these requirements.

  11. Managing large-scale models: DBS

    International Nuclear Information System (INIS)

    1981-05-01

    A set of fundamental management tools for developing and operating a large scale model and data base system is presented. Based on experience in operating and developing a large scale computerized system, the only reasonable way to gain strong management control of such a system is to implement appropriate controls and procedures. Chapter I discusses the purpose of the book. Chapter II classifies a broad range of generic management problems into three groups: documentation, operations, and maintenance. First, system problems are identified then solutions for gaining management control are disucssed. Chapters III, IV, and V present practical methods for dealing with these problems. These methods were developed for managing SEAS but have general application for large scale models and data bases

  12. Semantic World Modelling and Data Management in a 4d Forest Simulation and Information System

    Science.gov (United States)

    Roßmann, J.; Hoppen, M.; Bücken, A.

    2013-08-01

    Various types of 3D simulation applications benefit from realistic forest models. They range from flight simulators for entertainment to harvester simulators for training and tree growth simulations for research and planning. Our 4D forest simulation and information system integrates the necessary methods for data extraction, modelling and management. Using modern methods of semantic world modelling, tree data can efficiently be extracted from remote sensing data. The derived forest models contain position, height, crown volume, type and diameter of each tree. This data is modelled using GML-based data models to assure compatibility and exchangeability. A flexible approach for database synchronization is used to manage the data and provide caching, persistence, a central communication hub for change distribution, and a versioning mechanism. Combining various simulation techniques and data versioning, the 4D forest simulation and information system can provide applications with "both directions" of the fourth dimension. Our paper outlines the current state, new developments, and integration of tree extraction, data modelling, and data management. It also shows several applications realized with the system.

  13. A three-level atomicity model for decentralized workflow management systems

    Science.gov (United States)

    Ben-Shaul, Israel Z.; Heineman, George T.

    1996-12-01

    A workflow management system (WFMS) employs a workflow manager (WM) to execute and automate the various activities within a workflow. To protect the consistency of data, the WM encapsulates each activity with a transaction; a transaction manager (TM) then guarantees the atomicity of activities. Since workflows often group several activities together, the TM is responsible for guaranteeing the atomicity of these units. There are scalability issues, however, with centralized WFMSs. Decentralized WFMSs provide an architecture for multiple autonomous WFMSs to interoperate, thus accommodating multiple workflows and geographically-dispersed teams. When atomic units are composed of activities spread across multiple WFMSs, however, there is a conflict between global atomicity and local autonomy of each WFMS. This paper describes a decentralized atomicity model that enables workflow administrators to specify the scope of multi-site atomicity based upon the desired semantics of multi-site tasks in the decentralized WFMS. We describe an architecture that realizes our model and execution paradigm.

  14. A Dynamic Simulation Model of the Management Accounting Information Systems (MAIS)

    Science.gov (United States)

    Konstantopoulos, Nikolaos; Bekiaris, Michail G.; Zounta, Stella

    2007-12-01

    The aim of this paper is to examine the factors which determine the problems and the advantages on the design of management accounting information systems (MAIS). A simulation is carried out with a dynamic model of the MAIS design.

  15. The Modular Modeling System (MMS): A toolbox for water- and environmental-resources management

    Science.gov (United States)

    Leavesley, G.H.; Markstrom, S.L.; Viger, R.J.; Hay, L.E.; ,

    2005-01-01

    The increasing complexity of water- and environmental-resource problems require modeling approaches that incorporate knowledge from a broad range of scientific and software disciplines. To address this need, the U.S. Geological Survey (USGS) has developed the Modular Modeling System (MMS). MMS is an integrated system of computer software for model development, integration, and application. Its modular design allows a high level of flexibility and adaptability to enable modelers to incorporate their own software into a rich array of built-in models and modeling tools. These include individual process models, tightly coupled models, loosely coupled models, and fully- integrated decision support systems. A geographic information system (GIS) interface, the USGS GIS Weasel, has been integrated with MMS to enable spatial delineation and characterization of basin and ecosystem features, and to provide objective parameter-estimation methods for models using available digital data. MMS provides optimization and sensitivity-analysis tools to analyze model parameters and evaluate the extent to which uncertainty in model parameters affects uncertainty in simulation results. MMS has been coupled with the Bureau of Reclamation object-oriented reservoir and river-system modeling framework, RiverWare, to develop models to evaluate and apply optimal resource-allocation and management strategies to complex, operational decisions on multipurpose reservoir systems and watersheds. This decision support system approach has been developed, tested, and implemented in the Gunnison, Yakima, San Joaquin, Rio Grande, and Truckee River basins of the western United States. MMS is currently being coupled with the U.S. Forest Service model SIMulating Patterns and Processes at Landscape Scales (SIMPPLLE) to assess the effects of alternative vegetation-management strategies on a variety of hydrological and ecological responses. Initial development and testing of the MMS-SIMPPLLE integration is

  16. A systems engineering management approach to resource management applications

    Science.gov (United States)

    Hornstein, Rhoda Shaller

    1989-01-01

    The author presents a program management response to the following question: How can the traditional practice of systems engineering management, including requirements specification, be adapted, enhanced, or modified to build future planning and scheduling systems for effective operations? The systems engineering management process, as traditionally practiced, is examined. Extensible resource management systems are discussed. It is concluded that extensible systems are a partial solution to problems presented by requirements that are incomplete, partially immeasurable, and often dynamic. There are positive indications that resource management systems have been characterized and modeled sufficiently to allow their implementation as extensible systems.

  17. Management Information Systems at CERN

    CERN Document Server

    Ferguson, J

    1986-01-01

    The specific areas addressed in the study are 1.Management decision support (data presentation, data base management systems â" DBMS, modeling) 2.Text processing, 3.Electronic communication for management purposes, 4.Office automation, 5.Administrative use of Management Information Systems (MIS) and in particular Administrative Data Processing (ADP).

  18. Coupled electrochemical thermal modelling of a novel Li-ion battery pack thermal management system

    International Nuclear Information System (INIS)

    Basu, Suman; Hariharan, Krishnan S.; Kolake, Subramanya Mayya; Song, Taewon; Sohn, Dong Kee; Yeo, Taejung

    2016-01-01

    Highlights: • Three-dimensional electrochemical thermal model of Li-ion battery pack using computational fluid dynamics (CFD). • Novel pack design for compact liquid cooling based thermal management system. • Simple temperature estimation algorithm for the cells in the pack using the results from the model. • Sensitivity of the thermal performance to contact resistance has been investigated. - Abstract: Thermal management system is of critical importance for a Li-ion battery pack, as high performance and long battery pack life can be simultaneously achieved when operated within a narrow range of temperature around the room temperature. An efficient thermal management system is required to keep the battery temperature in this range, despite widely varying operating conditions. A novel liquid coolant based thermal management system, for 18,650 battery pack has been introduced herein. This system is designed to be compact and economical without compromising safety. A coupled three-dimensional (3D) electrochemical thermal model is constructed for the proposed Li-ion battery pack. The model is used to evaluate the effects of different operating conditions like coolant flow-rate and discharge current on the pack temperature. Contact resistance is found to have the strongest impact on the thermal performance of the pack. From the numerical solution, a simple and novel temperature correlation of predicting the temperatures of all the individual cells given the temperature measurement of one cell is devised and validated with experimental results. Such coefficients have great potential of reducing the sensor requirement and complexity in a large Li-ion battery pack, typical of an electric vehicle.

  19. [The future of clinical laboratory database management system].

    Science.gov (United States)

    Kambe, M; Imidy, D; Matsubara, A; Sugimoto, Y

    1999-09-01

    To assess the present status of the clinical laboratory database management system, the difference between the Clinical Laboratory Information System and Clinical Laboratory System was explained in this study. Although three kinds of database management systems (DBMS) were shown including the relational model, tree model and network model, the relational model was found to be the best DBMS for the clinical laboratory database based on our experience and developments of some clinical laboratory expert systems. As a future clinical laboratory database management system, the IC card system connected to an automatic chemical analyzer was proposed for personal health data management and a microscope/video system was proposed for dynamic data management of leukocytes or bacteria.

  20. Model of environmental management system for environmentally sustainable universities training in Colombia

    International Nuclear Information System (INIS)

    Rivas Marin, Maria Isabel

    2011-01-01

    Sustainable campuses have become one of the main objectives of the Agendas University as a result of the impacts generated by the activities developed there and affect the environment. Given this, there are environmental management systems which are the set of practices, procedures, processes and resources needed to meet environmental regulations on business and are focused on reducing the impacts on the environment and the efficiency of processes. College- level companies still being considered, these systems do not work efficiently, it is necessary and urgent that the adequacy of a model environmental management system and that, through education and research, will help society to achieve the transition to sustainable lifestyles.

  1. Using a data base management system for modelling SSME test history data

    Science.gov (United States)

    Abernethy, K.

    1985-01-01

    The usefulness of a data base management system (DBMS) for modelling historical test data for the complete series of static test firings for the Space Shuttle Main Engine (SSME) was assessed. From an analysis of user data base query requirements, it became clear that a relational DMBS which included a relationally complete query language would permit a model satisfying the query requirements. Representative models and sample queries are discussed. A list of environment-particular evaluation criteria for the desired DBMS was constructed; these criteria include requirements in the areas of user-interface complexity, program independence, flexibility, modifiability, and output capability. The evaluation process included the construction of several prototype data bases for user assessement. The systems studied, representing the three major DBMS conceptual models, were: MIRADS, a hierarchical system; DMS-1100, a CODASYL-based network system; ORACLE, a relational system; and DATATRIEVE, a relational-type system.

  2. INFOGRAPHIC MODELING OF THE HIERARCHICAL STRUCTURE OF THE MANAGEMENT SYSTEM EXPOSED TO AN INNOVATIVE CONFLICT

    Directory of Open Access Journals (Sweden)

    Chulkov Vitaliy Olegovich

    2012-12-01

    Full Text Available This article deals with the infographic modeling of hierarchical management systems exposed to innovative conflicts. The authors analyze the facts that serve as conflict drivers in the construction management environment. The reasons for innovative conflicts include changes in hierarchical structures of management systems, adjustment of workers to new management conditions, changes in the ideology, etc. Conflicts under consideration may involve contradictions between requests placed by customers and the legislation, any risks that may originate from the above contradiction, conflicts arising from any failure to comply with any accepted standards of conduct, etc. One of the main objectives of the theory of hierarchical structures is to develop a model capable of projecting potential innovative conflicts. Models described in the paper reflect dynamic changes in patterns of external impacts within the conflict area. The simplest model element is a monad, or an indivisible set of characteristics of participants at the pre-set level. Interaction between two monads forms a diad. Modeling of situations that involve a different number of monads, diads, resources and impacts can improve methods used to control and manage hierarchical structures in the construction industry. However, in the absence of any mathematical models employed to simulate conflict-related events, processes and situations, any research into, projection and management of interpersonal and group-to-group conflicts are to be performed in the legal environment

  3. Application of macro material flow modeling to the decision making process for integrated waste management systems

    International Nuclear Information System (INIS)

    Vigil, S.A.; Holter, G.M.

    1995-04-01

    Computer models have been used for almost a decade to model and analyze various aspects of solid waste management Commercially available models exist for estimating the capital and operating costs of landfills, waste-to-energy facilities and compost systems and for optimizing system performance along a single dimension (e.g. cost or transportation distance). An alternative to the use of currently available models is the more flexible macro material flow modeling approach in which a macro scale or regional level approach is taken. Waste materials are tracked through the complete integrated waste management cycle from generation through recycling and reuse, and finally to ultimate disposal. Such an approach has been applied by the authors to two different applications. The STELLA simulation language (for Macintosh computers) was used to model the solid waste management system of Puerto Rico. The model incorporated population projections for all 78 municipalities in Puerto Rico from 1990 to 2010, solid waste generation factors, remaining life for the existing landfills, and projected startup time for new facilities. The Pacific Northwest Laboratory has used the SimScript simulation language (for Windows computers) to model the management of solid and hazardous wastes produced during cleanup and remediation activities at the Hanford Nuclear Site

  4. Systems Modeling to Implement Integrated System Health Management Capability

    Science.gov (United States)

    Figueroa, Jorge F.; Walker, Mark; Morris, Jonathan; Smith, Harvey; Schmalzel, John

    2007-01-01

    ISHM capability includes: detection of anomalies, diagnosis of causes of anomalies, prediction of future anomalies, and user interfaces that enable integrated awareness (past, present, and future) by users. This is achieved by focused management of data, information and knowledge (DIaK) that will likely be distributed across networks. Management of DIaK implies storage, sharing (timely availability), maintaining, evolving, and processing. Processing of DIaK encapsulates strategies, methodologies, algorithms, etc. focused on achieving high ISHM Functional Capability Level (FCL). High FCL means a high degree of success in detecting anomalies, diagnosing causes, predicting future anomalies, and enabling health integrated awareness by the user. A model that enables ISHM capability, and hence, DIaK management, is denominated the ISHM Model of the System (IMS). We describe aspects of the IMS that focus on processing of DIaK. Strategies, methodologies, and algorithms require proper context. We describe an approach to define and use contexts, implementation in an object-oriented software environment (G2), and validation using actual test data from a methane thruster test program at NASA SSC. Context is linked to existence of relationships among elements of a system. For example, the context to use a strategy to detect leak is to identify closed subsystems (e.g. bounded by closed valves and by tanks) that include pressure sensors, and check if the pressure is changing. We call these subsystems Pressurizable Subsystems. If pressure changes are detected, then all members of the closed subsystem become suspect of leakage. In this case, the context is defined by identifying a subsystem that is suitable for applying a strategy. Contexts are defined in many ways. Often, a context is defined by relationships of function (e.g. liquid flow, maintaining pressure, etc.), form (e.g. part of the same component, connected to other components, etc.), or space (e.g. physically close

  5. Integrating observational and modelling systems for the management of the Great Barrier Reef

    Science.gov (United States)

    Baird, M. E.; Jones, E. M.; Margvelashvili, N.; Mongin, M.; Rizwi, F.; Robson, B.; Schroeder, T.; Skerratt, J.; Steven, A. D.; Wild-Allen, K.

    2016-02-01

    Observational and modelling systems provide two sources of knowledge that must be combined to provide a more complete view than either observations or models alone can provide. Here we describe the eReefs coupled hydrodynamic, sediment and biogeochemical model that has been developed for the Great Barrier Reef; and the multiple observations that are used to constrain the model. Two contrasting examples of model - observational integration are highlighted. First we explore the carbon chemistry of the waters above the reef, for which observations are accurate, but expensive and therefore sparse, while model behaviour is highly skilful. For carbon chemistry, observations are used to constrain model parameterisation and quantify model error, with the model output itself providing the most useable knowledge for management purposes. In contrast, ocean colour provides inaccurate, but cheap and spatially and temporally extensive observations. Thus observations are best combined with the model in a data assimilating framework, where a custom-designed optical model has been developed for the purposes of incorporating ocean colour observations. The future management of Great Barrier Reef water quality will be based on an integration of observing and modelling systems, providing the most robust information available.

  6. Integrated management systems

    CERN Document Server

    Bugdol, Marek

    2015-01-01

    Examining the challenges of integrated management, this book explores the importance and potential benefits of using an integrated approach as a cross-functional concept of management. It covers not only standardized management systems (e.g. International Organization for Standardization), but also models of self-assessment, as well as different types of integration. Furthermore, it demonstrates how processes and systems can be integrated, and how management efficiency can be increased. The major part of this book focuses on management concepts which use integration as a key tool of management processes (e.g. the systematic approach, supply chain management, virtual and network organizations, processes management and total quality management). Case studies, illustrations, and tables are also provided to exemplify and illuminate the content, as well as examples of successful and failed integrations. Providing a particularly useful resource to managers and specialists involved in the improvement of organization...

  7. An inexact two-stage stochastic energy systems planning model for managing greenhouse gas emission at a municipal level

    International Nuclear Information System (INIS)

    Lin, Q.G.; Huang, G.H.

    2010-01-01

    Energy management systems are highly complicated with greenhouse-gas emission reduction issues and a variety of social, economic, political, environmental and technical factors. To address such complexities, municipal energy systems planning models are desired as they can take account of these factors and their interactions within municipal energy management systems. This research is to develop an interval-parameter two-stage stochastic municipal energy systems planning model (ITS-MEM) for supporting decisions of energy systems planning and GHG (greenhouse gases) emission management at a municipal level. ITS-MEM is then applied to a case study. The results indicated that the developed model was capable of supporting municipal energy systems planning and environmental management under uncertainty. Solutions of ITS-MEM would provide an effective linkage between the pre-regulated environmental policies (GHG-emission reduction targets) and the associated economic implications (GHG-emission credit trading).

  8. Product Lifecycle Management Architecture: A Model Based Systems Engineering Analysis.

    Energy Technology Data Exchange (ETDEWEB)

    Noonan, Nicholas James [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-07-01

    This report is an analysis of the Product Lifecycle Management (PLM) program. The analysis is centered on a need statement generated by a Nuclear Weapons (NW) customer. The need statement captured in this report creates an opportunity for the PLM to provide a robust service as a solution. Lifecycles for both the NW and PLM are analyzed using Model Based System Engineering (MBSE).

  9. Dragon pulse information management system (DPIMS): A unique model-based approach to implementing domain agnostic system of systems and behaviors

    Science.gov (United States)

    Anderson, Thomas S.

    2016-05-01

    The Global Information Network Architecture is an information technology based on Vector Relational Data Modeling, a unique computational paradigm, DoD network certified by USARMY as the Dragon Pulse Informa- tion Management System. This network available modeling environment for modeling models, where models are configured using domain relevant semantics and use network available systems, sensors, databases and services as loosely coupled component objects and are executable applications. Solutions are based on mission tactics, techniques, and procedures and subject matter input. Three recent ARMY use cases are discussed a) ISR SoS. b) Modeling and simulation behavior validation. c) Networked digital library with behaviors.

  10. System dynamics model of taxi management in metropolises: Economic and environmental implications for Beijing.

    Science.gov (United States)

    Wang, Hao; Zhang, Kai; Chen, Junhua; Wang, Zhifeng; Li, Guijun; Yang, Yuqi

    2018-05-01

    Taxis are an important component of urban passenger transport. Research on the daily dispatching of taxis and the utility of governmental management is important for the improvement of passenger travel, taxi driver income and environmental impacts. However, urban taxi management is a complex and dynamic system that is affected by many factors, and positive/negative feedback relationships and nonlinear interactions exist between each subsystem and variable. Therefore, conventional research methods can hardly depict its characteristics comprehensively. To bridge this gap, this paper develops a system dynamics model of urban taxi management, in which the empty-loaded rate and total demand are selected as key factors affecting taxi dispatching, and the impacts of taxi fares on driver income and travel demand are taken into account. After the validation of the model, taxi operations data derived from a prior analysis of origin-destination data of Beijing taxis are used as input for the model to simulate the taxi market in Beijing. Finally, economic and environmental implications are provided for the government to optimise policies on taxi management. Copyright © 2018 Elsevier Ltd. All rights reserved.

  11. Topology of sustainable management in dynamical Earth system models with desirable states

    Science.gov (United States)

    Heitzig, J.; Kittel, T.

    2015-03-01

    To keep the Earth system in a desirable region of its state space, such as the recently suggested "tolerable environment and development window", "planetary boundaries", or "safe (and just) operating space", one not only needs to understand the quantitative internal dynamics of the system and the available options for influencing it (management), but also the structure of the system's state space with regard to certain qualitative differences. Important questions are: which state space regions can be reached from which others with or without leaving the desirable region? Which regions are in a variety of senses "safe" to stay in when management options might break away, and which qualitative decision problems may occur as a consequence of this topological structure? In this article, as a complement to the existing literature on optimal control which is more focussed on quantitative optimization and is much applied in both the engineering and the integrated assessment literature, we develop a mathematical theory of the qualitative topology of the state space of a dynamical system with management options and desirable states. We suggest a certain terminology for the various resulting regions of the state space and perform a detailed formal classification of the possible states with respect to the possibility of avoiding or leaving the undesired region. Our results indicate that before performing some form of quantitative optimization, the sustainable management of the Earth system may require decisions of a more discrete type that come in the form of several dilemmata, e.g., choosing between eventual safety and uninterrupted desirability, or between uninterrupted safety and increasing flexibility. We illustrate the concepts and dilemmata with conceptual models from classical mechanics, climate science, ecology, economics, and coevolutionary Earth system modelling and discuss their potential relevance for the climate and sustainability debate.

  12. A multi-fuel management model for a community-level district heating system under multiple uncertainties

    International Nuclear Information System (INIS)

    Fu, D.Z.; Zheng, Z.Y.; Shi, H.B.; Xiao, Rui; Huang, G.H.; Li, Y.P.

    2017-01-01

    In this study, an interval two-stage double-stochastic single-sided fuzzy chance-constrained programming model is developed for supporting fuel management of a community-level district heating system (DHS) fed with both traditional fossil fuels and renewable biofuels under multiple uncertainties. The proposed model is based on the integration of interval parameter programming and single-sided fuzzy chance-constrained programming within an improved stochastic programming framework to tackle the uncertainties expressed as crisp intervals, fuzzy relationship, and probability distributions. Through transforming and solving the model, the related fuzzy and stochastic information can be effectively reflected in the generated solutions. A real fuel management case of a DHS located in Junpu New District of Dalian is utilized to demonstrate the model applicability. The obtained solutions provides an effective linkage in terms of both ‘‘quality’’ and ‘‘quantity’’ aspects for fuel management under various scenarios associated with multiple factors, and thus can help the decision makers to identify desired fuel allotment patterns. Moreover, this study is also useful for decision makers to address the other challenges (e.g. the imbalance between fuel supply and demand, the contradiction between air-pollution emission and environmental protection, as well as the tradeoff between the total heating cost and system satisfaction degree) generated in the fuel management processes. - Highlights: • A feasible two-stage stochastic programming method is improved. • A multi-fuel management model is developed under multiple uncertainties. • The fuel supply pattern for a district heating system can be obtained. • The variation tendencies of the pollutant emissions are examined. • Tradeoff analyses between system satisfaction degree and cost are carried out.

  13. Modeling the design and operations of the federal radioactive waste management system

    International Nuclear Information System (INIS)

    Joy, D.S.; Nehls, J.W. Jr.; Harrison, I.G.; Miller, C.; Vogel, L.W.; Martin, J.D.; Capone, R.L.; Dougherty, L.

    1989-04-01

    Many configuration, transportation and operating alternatives are available to the Office of Civilian Radioactive Waste Management (OCRWM) in the design and operation of the Federal Radioactive Waste Management System (FWMS). Each alternative has different potential impacts on system throughput, efficiency and the thermal and radiological characteristics of the waste to be shipped, stored and emplaced. A need therefore exists for a quantitative means of assessing the ramifications of alternative system designs and operating strategies. We developed the Systems integration Operations/Logistics Model (SOLMOD). That model is used to replicate a user-specified system configuration and simulate the operation of that system -- from waste pickup at reactors to emplacement in a repository -- under a variety of operating strategies. The model can thus be used to assess system performance with or without Monitored Retrievable Storage (MRS), with or without consolidation at the repository, with varying shipping cask availability and so forth. This simulation capability is also intended to provide a tool for examining the impact of facility and equipment capacity and redundancy on overall waste processing capacity and system performance. SOLMOD can measure the impacts on system performance of certain operating contingencies. It can be used to test effects on transportation and waste pickup schedules resulting from a shut-down of one or more hot cells in the waste handling building at the repository or MRS. Simulation can also be used to study operating procedures and rules such as fuel pickup schedules, general freight vs. dedicated freight. 3 refs., 2 figs., 2 tabs

  14. Cylinder pressure sensing and model-based control in engine management systems

    Energy Technology Data Exchange (ETDEWEB)

    Truscott, A.; Noble, A.; Akoachere, A.; Beaumont, A. [Ricardo Consulting Engineers Ltd., Bridge Works (United Kingdom); Mueller, R.; Hart, M. [FT2/EA, HPC T721, DaimlerChrysler AG, Stuttgart (Germany); Kroetz, G. [FT2/M, DaimlerChrysler AG, Muenchen (Germany); Cavalloni, C.; Gnielka, M. [Kistler Instrumente AG, Winterthur (Switzerland)

    2000-07-01

    Global demands on fuel economy and lower emissions from automotive vehicles have had a large impact on the development of engine management systems (EMS) in recent years. However, despite the advances in system hardware, the software programmed into these systems has yet to utilise the full potential of modern control methodologies. Model based control and diagnostics is the next step forward in the development of EMS software with the potential of providing improvements in cost, efficiency, emissions and comfort. However, the full utilisation of such techniques requires very close monitoring of engine conditions. This is made possible with the advent of new inexpensive sensor technology that can withstand the harsh environment of the combustion chamber. To exploit the above advances, the AENEAS collaborative project is being carried out by Ricardo, DaimlerChrysler and Kistler, with financial support from the European Commission and Swiss government, and has the objective of realising the benefits of cylinder pressure based engine management system (CPEMS) technology. This paper describes the application of CPEMS technology to a spark ignition (SI) engine. It describes how the combination of model based algorithms, incorporating physical principles, and cylinder pressure sensing can provide an effective means of engine control and diagnostics. (orig.)

  15. Managing Temporal Knowledge in Port Management Systems

    Directory of Open Access Journals (Sweden)

    Anita Gudelj

    2006-05-01

    Full Text Available Large ports need to deal with a number of disparate activities:the movement of ships, containers and other cargo, theloading and unloading of ships and containers, customs activities.As well as human resources, anchorages, channels, lighters,tugs, berths, warehouse and other storage spaces have to beallocated and released. The efficient management of a port involvesmanaging these activities and resources, managing theflows of money involved between the agents providing and usingthese resources, and providing management information.Many information systems will be involved.Many applications have to deal with a large amount of datawhich not only represent the perceived state of the real world atpresent, but also past and/or future states. These applicationsare not served adequately by today's computer managementand database systems. In particular, deletions and updates insuch systems have destructive semantics. This means that previousdatabase contents (representing previous perceived statesof the real world cannot be accessed anymore.A review of how define temporal data models, based ongeneralizing a non-temporal data model in to a temporal one toimprove port management is presented. This paper describes apractical experiment which supports managing temporal dataalong with the corresponding prototype implementations.

  16. Developing a New Integrated Model to improve the using of Classical Approach in Designing Management Information Systems

    OpenAIRE

    Mohammad M M Abu Omar; Khairul Anuar Abdullah

    2015-01-01

    Management information system (MIS) is used to solve management problems in the practical life, the designing and building of the management information systems is done by using one of the systems development methodologies. Classical approach is one of these methodologies which still suffer from some critical problems when it is used in designing and building the management information systems, it consumes more time and cost during its life cycle. This paper develops a new integrated model to...

  17. Municipal solid waste management system: decision support through systems analysis

    OpenAIRE

    Pires, Ana Lúcia Lourenço

    2010-01-01

    Thesis submitted to the Universidade Nova de Lisboa, Faculdade de Ciências e Tecnologia for the degree of Doctor of Philosophy in Environmental Engineering The present study intends to show the development of systems analysis model applied to solid waste management system, applied into AMARSUL, a solid waste management system responsible for the management of municipal solid waste produced in Setúbal peninsula, Portugal. The model developed intended to promote sustainable decision making, ...

  18. Theory and experiments in model-based space system anomaly management

    Science.gov (United States)

    Kitts, Christopher Adam

    This research program consists of an experimental study of model-based reasoning methods for detecting, diagnosing and resolving anomalies that occur when operating a comprehensive space system. Using a first principles approach, several extensions were made to the existing field of model-based fault detection and diagnosis in order to develop a general theory of model-based anomaly management. Based on this theory, a suite of algorithms were developed and computationally implemented in order to detect, diagnose and identify resolutions for anomalous conditions occurring within an engineering system. The theory and software suite were experimentally verified and validated in the context of a simple but comprehensive, student-developed, end-to-end space system, which was developed specifically to support such demonstrations. This space system consisted of the Sapphire microsatellite which was launched in 2001, several geographically distributed and Internet-enabled communication ground stations, and a centralized mission control complex located in the Space Technology Center in the NASA Ames Research Park. Results of both ground-based and on-board experiments demonstrate the speed, accuracy, and value of the algorithms compared to human operators, and they highlight future improvements required to mature this technology.

  19. Building trusted national identity management systems: Presenting the privacy concern-trust (PCT) model

    DEFF Research Database (Denmark)

    Adjei, Joseph K.; Olesen, Henning

    This paper discusses the effect of trust and information privacy concerns on citizens’ attitude towards national identity management systems. We introduce the privacyconcerns- trust model, which shows the role of trust in mediating and moderating citizens’ attitude towards identity management...... systems. We adopted a qualitative research approach in our analysis of data that was gathered through a series of interviews and a stakeholder workshop in Ghana. Our findings indicate that, beyond the threshold level of trust, societal information privacy concern is low; hence, trust is high, thereby...

  20. An Advanced HIL Simulation Battery Model for Battery Management System Testing

    DEFF Research Database (Denmark)

    Barreras, Jorge Varela; Fleischer, Christian; Christensen, Andreas Elkjær

    2016-01-01

    Developers and manufacturers of battery management systems (BMSs) require extensive testing of controller Hardware (HW) and Software (SW), such as analog front-end and performance of generated control code. In comparison with the tests conducted on real batteries, tests conducted on a state......-of-the-art hardware-in-the-loop (HIL) simulator can be more cost and time effective, easier to reproduce, and safer beyond the normal range of operation, especially at early stages in the development process or during fault insertion. In this paper, an HIL simulation battery model is developed for purposes of BMS...... testing on a commercial HIL simulator. A multicell electrothermal Li-ion battery (LIB) model is integrated in a system-level simulation. Then, the LIB system model is converted to C code and run in real time with the HIL simulator. Finally, in order to demonstrate the capabilities of the setup...

  1. Introducing the Evaluation Tools for HSE Management System Performance Using Balanced Score Card Model

    Directory of Open Access Journals (Sweden)

    Ali Mohammadi

    2016-12-01

    Full Text Available Background: The performance of the HSE units has various dimensions Leading to different performances. Thus, any industry should be capable of evaluating these systems. The aim of this study was to design a standard questionnaire in the field of performance evaluation of HSE management system employing Balanced Score Card model. Methods: In this study we, first determined the criteria to be evaluated in the framework of Balanced Score Card model based on the objectives and strategies of HSE Management System and existing standards, and then designed questions on every criterion. We used content validity and Cronbach's Alpha to determine the reliability and validity of the questionnaire. Results: The primary questionnaire was comprised of 126 questions some of which were omitted regarding the results obtained from the CVR and CVI values. We obtained the CVI average of environmental dimension to be 0.75 and its CVI average 0.71. Conclusion: With respect to the results of the reliability and validity of this questionnaire,and its standardized design we can suggest using it for evaluation of HSE management system performance in organizations and industries with the mentioned system.

  2. Systems management of facilities agreements

    International Nuclear Information System (INIS)

    Blundell, A.

    1998-01-01

    The various types of facilities agreements, the historical obstacles to implementation of agreement management systems and the new opportunities emerging as industry is beginning to make an effort to overcome these obstacles, are reviewed. Barriers to computerized agreement management systems (lack of consistency, lack of standards, scarcity of appropriate computer software) are discussed. Characteristic features of a model facilities agreement management system and the forces driving the changing attitudes towards such systems (e.g. mergers) are also described

  3. Entrepreneurial environmental management model of marketing in a political-administrative system of Ukraine

    Directory of Open Access Journals (Sweden)

    Sadchenko Olena Vasylivna

    2015-02-01

    Full Text Available The article deals with proposals for entrepreneurial model of environmental management, in particular environmental marketing in modern political and administrative systems. In the context of the complexity of the social structure, forming a dense network of communications, globalization, cultural and economic-ecological space offers new mechanisms for the relationship between the state and civil society in environmental management.

  4. The Identification and Modeling of Business Processes of the Quality Management System in an Educational Organization: Theory and Practice

    Directory of Open Access Journals (Sweden)

    Stankevych Iryna V.

    2017-03-01

    Full Text Available The aim of the article is to ensure effectiveness of implementation of management objectives of an educational organization by identifying business processes of the quality management system of the educational organization and justifying the choice of language and diagrams of their modeling. The author emphasizes that the approach to identifying business processes of the quality management system of an educational organization should be based not on the types but on the results of the organization’s activity in higher education. It is determined that an effective approach to identifying business processes of the quality management system of an educational organization should be based on the life cycle of the educational service (quality loop, the requirements of the ISO 9001: 2015 standard for building the processes of the quality management system and the standardized list of business processes International Benchmarking Clearinghouse. For further implementation of the quality management system, the author developed a contextual diagram of the system, which is decomposed into processes of level “0” and level “1”. The paper discusses the advantages and disadvantages of various modeling languages applicable to business process virtualization, in particular the unified UML modeling language, which uses a number of diagrams to virtualize business processes of complex organizations. The practical recommendations developed for the identification and modeling of business processes in the quality management system will facilitate an effective implementation of such systems in activities of educational organizations, which will further ensure satisfaction of customer requirements and implementation of management objectives.

  5. A management systems approach to pipeline integrity

    Energy Technology Data Exchange (ETDEWEB)

    Abes, J. [CC Technologies Canada, Calgary, AB (Canada)

    2008-07-01

    A management systems approach to pipeline integrity was discussed in terms of accident causation models, lessons from accidents, and management systems. Accident causation models include the Heinrich domino theory; epidemiological models; event chain models; and system-based models. A review of the Bellingham pipeline accident showed that if the pipeline had not been weakened by external damage, it likely would have been able to withstand the pressure that occurred on the day of the rupture, and the accident would not have happened. It was also determined that there was inadequate inspection of excavation work during the water treatment plant project and consequently, there was a failure to identify and repair the damage done to the pipeline. The presentation also addressed other findings, such as inaccurate evaluation of in-line pipeline inspection data; failure to manage and protect the supervisory control and data acquisition system (SCADA); and ineffective management oversight of construction and activation of products terminal. The Carlsbad pipeline explosion was also presented as another example of an accident. Several violations by El Paso were cited, including failure to ensure that qualified personnel performed internal corrosion control procedures; failure to perform necessary tests for corrosion; and failure to follow procedures for continuing surveillance of its facilities. Last, the presentation provided a definition of management systems and discussed the characteristics and elements of a management system. These elements included policy and leadership commitment; organizational structure and responsibilities; management of resources; communication plan; document and records management; operational controls; management of change; and continual improvement. 1 fig.

  6. A Study on Influencing Factors of Knowledge Management Systems Adoption: Models Comparison Approach

    OpenAIRE

    Mei-Chun Yeh; Ming-Shu Yuan

    2007-01-01

    Using Linear Structural Relation model (LISREL model) as analysis method and technology acceptance model and decomposed theory of planned behavior as research foundation, this study approachesmainly from the angle of behavioral intention to examine the influential factors of 421 employees adopting knowledge management systems and in the meantime to compare the two method models mentioned on the top. According to the research, there is no, in comparison with technology acceptance model anddeco...

  7. Comparative Pedagogical Studies on Models of Education Systems Management in the EU and Ukraine

    Science.gov (United States)

    Desiatov, Tymofii

    2017-01-01

    The article highlights the peculiarities of models of education systems management in the EU and Ukraine. It has been proved that effectiveness of the education process is determined by managerial culture, which characterizes a manager's professional image. Special attention has been paid to finding the right balance between centralization and…

  8. Advanced Approach to Information Security Management System Model for Industrial Control System

    Directory of Open Access Journals (Sweden)

    Sanghyun Park

    2014-01-01

    Full Text Available Organizations make use of important information in day-to-day business. Protecting sensitive information is imperative and must be managed. Companies in many parts of the world protect sensitive information using the international standard known as the information security management system (ISMS. ISO 27000 series is the international standard ISMS used to protect confidentiality, integrity, and availability of sensitive information. While an ISMS based on ISO 27000 series has no particular flaws for general information systems, it is unfit to manage sensitive information for industrial control systems (ICSs because the first priority of industrial control is safety of the system. Therefore, a new information security management system based on confidentiality, integrity, and availability as well as safety is required for ICSs. This new ISMS must be mutually exclusive of an ICS. This paper provides a new paradigm of ISMS for ICSs, which will be shown to be more suitable than the existing ISMS.

  9. Advanced approach to information security management system model for industrial control system.

    Science.gov (United States)

    Park, Sanghyun; Lee, Kyungho

    2014-01-01

    Organizations make use of important information in day-to-day business. Protecting sensitive information is imperative and must be managed. Companies in many parts of the world protect sensitive information using the international standard known as the information security management system (ISMS). ISO 27000 series is the international standard ISMS used to protect confidentiality, integrity, and availability of sensitive information. While an ISMS based on ISO 27000 series has no particular flaws for general information systems, it is unfit to manage sensitive information for industrial control systems (ICSs) because the first priority of industrial control is safety of the system. Therefore, a new information security management system based on confidentiality, integrity, and availability as well as safety is required for ICSs. This new ISMS must be mutually exclusive of an ICS. This paper provides a new paradigm of ISMS for ICSs, which will be shown to be more suitable than the existing ISMS.

  10. Advanced Approach to Information Security Management System Model for Industrial Control System

    Science.gov (United States)

    2014-01-01

    Organizations make use of important information in day-to-day business. Protecting sensitive information is imperative and must be managed. Companies in many parts of the world protect sensitive information using the international standard known as the information security management system (ISMS). ISO 27000 series is the international standard ISMS used to protect confidentiality, integrity, and availability of sensitive information. While an ISMS based on ISO 27000 series has no particular flaws for general information systems, it is unfit to manage sensitive information for industrial control systems (ICSs) because the first priority of industrial control is safety of the system. Therefore, a new information security management system based on confidentiality, integrity, and availability as well as safety is required for ICSs. This new ISMS must be mutually exclusive of an ICS. This paper provides a new paradigm of ISMS for ICSs, which will be shown to be more suitable than the existing ISMS. PMID:25136659

  11. modeling workflow management in a distributed computing system

    African Journals Online (AJOL)

    Dr Obe

    communication system, which allows for computerized support. ... Keywords: Distributed computing system; Petri nets;Workflow management. 1. ... A distributed operating system usually .... the questionnaire is returned with invalid data,.

  12. LCA of waste management systems: Development of tools for modeling and uncertainty analysis

    DEFF Research Database (Denmark)

    Clavreul, Julie

    Since the late 1990s, life cycle assessment (LCA) has been increasingly applied to waste management to quantify direct, indirect and avoided impacts from various treatment options. The construction of inventories for waste management systems differs from classical product-LCAs in that (1...... to be modelled rather than monitored as in classical LCA (e.g. landfilling or the application of processed waste on agricultural land). Therefore LCA-tools are needed which specifically address these issues and enable practitioners to model properly their systems. In this thesis several pieces of work...... in waste treatment technologies. These material transfer functions specify how substances in input flows are transferred to output flows and environmental compartments and include for example processes for anaerobic digestion or landfill gas generation. • Offering a flexible user interface where the user...

  13. GIS model-based real-time hydrological forecasting and operation management system for the Lake Balaton and its watershed

    Science.gov (United States)

    Adolf Szabó, János; Zoltán Réti, Gábor; Tóth, Tünde

    2017-04-01

    Today, the most significant mission of the decision makers on integrated water management issues is to carry out sustainable management for sharing the resources between a variety of users and the environment under conditions of considerable uncertainty (such as climate/land-use/population/etc. change) conditions. In light of this increasing water management complexity, we consider that the most pressing needs is to develop and implement up-to-date GIS model-based real-time hydrological forecasting and operation management systems for aiding decision-making processes to improve water management. After years of researches and developments the HYDROInform Ltd. has developed an integrated, on-line IT system (DIWA-HFMS: DIstributed WAtershed - Hydrologyc Forecasting & Modelling System) which is able to support a wide-ranging of the operational tasks in water resources management such as: forecasting, operation of lakes and reservoirs, water-control and management, etc. Following a test period, the DIWA-HFMS has been implemented for the Lake Balaton and its watershed (in 500 m resolution) at Central-Transdanubian Water Directorate (KDTVIZIG). The significant pillars of the system are: - The DIWA (DIstributed WAtershed) hydrologic model, which is a 3D dynamic water-balance model that distributed both in space and its parameters, and which was developed along combined principles but its mostly based on physical foundations. The DIWA integrates 3D soil-, 2D surface-, and 1D channel-hydraulic components as well. - Lakes and reservoir-operating component; - Radar-data integration module; - fully online data collection tools; - scenario manager tool to create alternative scenarios, - interactive, intuitive, highly graphical user interface. In Vienna, the main functions, operations and results-management of the system will be presented.

  14. Improvements to information management systems simulator

    Science.gov (United States)

    Bilek, R. W.

    1972-01-01

    The performance of personnel in the augmentation and improvement of the interactive IMSIM information management simulation model is summarized. With this augmented model, NASA now has even greater capabilities for the simulation of computer system configurations, data processing loads imposed on these configurations, and executive software to control system operations. Through these simulations, NASA has an extremely cost effective capability for the design and analysis of computer-based data management systems.

  15. Design of distributed systems of hydrolithosphere processes management. A synthesis of distributed management systems

    Science.gov (United States)

    Pershin, I. M.; Pervukhin, D. A.; Ilyushin, Y. V.; Afanaseva, O. V.

    2017-10-01

    The paper considers an important problem of designing distributed systems of hydrolithosphere processes management. The control actions on the hydrolithosphere processes under consideration are implemented by a set of extractive wells. The article shows the method of defining the approximation links for description of the dynamic characteristics of hydrolithosphere processes. The structure of distributed regulators, used in the management systems by the considered processes, is presented. The paper analyses the results of the synthesis of the distributed management system and the results of modelling the closed-loop control system by the parameters of the hydrolithosphere process.

  16. Congestion management in power systems. Long-term modeling framework and large-scale application

    Energy Technology Data Exchange (ETDEWEB)

    Bertsch, Joachim; Hagspiel, Simeon; Just, Lisa

    2015-06-15

    In liberalized power systems, generation and transmission services are unbundled, but remain tightly interlinked. Congestion management in the transmission network is of crucial importance for the efficiency of these inter-linkages. Different regulatory designs have been suggested, analyzed and followed, such as uniform zonal pricing with redispatch or nodal pricing. However, the literature has either focused on the short-term efficiency of congestion management or specific issues of timing investments. In contrast, this paper presents a generalized and flexible economic modeling framework based on a decomposed inter-temporal equilibrium model including generation, transmission, as well as their inter-linkages. Short and long-term effects of different congestion management designs can hence be analyzed. Specifically, we are able to identify and isolate implicit frictions and sources of inefficiencies in the different regulatory designs, and to provide a comparative analysis including a benchmark against a first-best welfare-optimal result. To demonstrate the applicability of our framework, we calibrate and numerically solve our model for a detailed representation of the Central Western European (CWE) region, consisting of 70 nodes and 174 power lines. Analyzing six different congestion management designs until 2030, we show that compared to the first-best benchmark, i.e., nodal pricing, inefficiencies of up to 4.6% arise. Inefficiencies are mainly driven by the approach of determining cross-border capacities as well as the coordination of transmission system operators' activities.

  17. Hanford solid waste management system simulation

    International Nuclear Information System (INIS)

    Shaver, S.R.; Armacost, L.L.; Konynenbelt, H.S.; Wehrman, R.R.

    1994-12-01

    This paper describes systems analysis and simulation model development for a proposed solid waste management system at a U.S. Department of Energy Site. The proposed system will include a central storage facility, four treatment facilities, and three disposal sites. The material managed by this system will include radioactive, hazardous, and mixed radioactive and hazardous wastes. The objective of the modeling effort is to provide a means of evaluating throughput and capacity requirements for the proposed treatment, storage, and disposal facilities. The model is used to evaluate alternative system configurations and the effect on the alternatives of changing waste stream characteristics and receipt schedules. An iterative modeling and analysis approach is used that provides macro-level models early in the project and establishes credibility with the customer. The results from the analyses based on the macro models influence system design decisions and provide information that helps focus subsequent model development. Modeling and simulation of alternative system configurations and operating strategies yield a better understanding of the solid waste system requirements. The model effectively integrates information obtained through systems analysis and waste characterization to provide a consistent basis for system and facility planning

  18. Gossip Management at Universities Using Big Data Warehouse Model Integrated with a Decision Support System

    Directory of Open Access Journals (Sweden)

    Pelin Vardarlier

    2016-01-01

    Full Text Available Big Data has recently been used for many purposes like medicine, marketing and sports. It has helped improve management decisions. However, for almost each case a unique data warehouse should be built to benefit from the merits of data mining and Big Data. Hence, each time we start from scratch to form and build a Big Data Warehouse. In this study, we propose a Big Data Warehouse and a model for universities to be used for information management, to be more specific gossip management. The overall model is a decision support system that may help university administraitons when they are making decisions and also provide them with information or gossips being circulated among students and staff. In the model, unsupervised machine learning algorithms have been employed. A prototype of the proposed system has also been presented in the study. User generated data has been collected from students in order to learn gossips and students’ problems related to school, classes, staff and instructors. The findings and results of the pilot study suggest that social media messages among students may give important clues for the happenings at school and this information may be used for management purposes.The model may be developed and implemented by not only universities but also some other organisations.

  19. A Risk-Based Interval Two-Stage Programming Model for Agricultural System Management under Uncertainty

    Directory of Open Access Journals (Sweden)

    Ye Xu

    2016-01-01

    Full Text Available Nonpoint source (NPS pollution caused by agricultural activities is main reason that water quality in watershed becomes worse, even leading to deterioration. Moreover, pollution control is accompanied with revenue’s fall for agricultural system. How to design and generate a cost-effective and environmentally friendly agricultural production pattern is a critical issue for local managers. In this study, a risk-based interval two-stage programming model (RBITSP was developed. Compared to general ITSP model, significant contribution made by RBITSP model was that it emphasized importance of financial risk under various probabilistic levels, rather than only being concentrated on expected economic benefit, where risk is expressed as the probability of not meeting target profit under each individual scenario realization. This way effectively avoided solutions’ inaccuracy caused by traditional expected objective function and generated a variety of solutions through adjusting weight coefficients, which reflected trade-off between system economy and reliability. A case study of agricultural production management with the Tai Lake watershed was used to demonstrate superiority of proposed model. Obtained results could be a base for designing land-structure adjustment patterns and farmland retirement schemes and realizing balance of system benefit, system-failure risk, and water-body protection.

  20. Modeling of urban solid waste management system: The case of Dhaka city

    International Nuclear Information System (INIS)

    Sufian, M.A.; Bala, B.K.

    2007-01-01

    This paper presents a system dynamics computer model to predict solid waste generation, collection capacity and electricity generation from solid waste and to assess the needs for waste management of the urban city of Dhaka, Bangladesh. Simulated results show that solid waste generation, collection capacity and electricity generation potential from solid waste increase with time. Population, uncleared waste, untreated waste, composite index and public concern are projected to increase with time for Dhaka city. Simulated results also show that increasing the budget for collection capacity alone does not improve environmental quality; rather an increased budget is required for both collection and treatment of solid wastes of Dhaka city. Finally, this model can be used as a computer laboratory for urban solid waste management (USWM) policy analysis

  1. Modeling of urban solid waste management system: the case of Dhaka city

    International Nuclear Information System (INIS)

    Sufian, M.A.; Bala, B.K.

    2005-01-01

    This paper presents a system dynamics computer model to predict solid waste generation, collection capacity and electricity generation from solid waste and to assess the needs for waste management of the urban city Dhaka Bangladesh. Simulated results show that solid waste generation, collection capacity and electricity generation potential from solid waste increase with time. Population, uncleared waste, untreated waste, composite index and public concern are increasing with time for Dhaka city. Simulated results also show that increasing the budge for collection capacity alone does not improve the environmental quality rather increased budget is required for both collection and treatment of solid wastes of Dhaka city. Finally, this model can be used as a compute laboratory for urban solid waste management (USWM) policy analysis. (author)

  2. A system for managing information at ATLAS

    International Nuclear Information System (INIS)

    Tilbrook, I.R.

    1993-01-01

    In response to a need for better management of maintenance and document information at the Argonne Tandem-Linear Accelerating System (ATLAS), the ATLAS Information Management System (AIMS) has been created. The system is based on the relational database model. The system's applications use the Alpha-4 relational database management system, a commercially available software package. The system's function and design are described

  3. Modified stretched exponential model of computer system resources management limitations-The case of cache memory

    Science.gov (United States)

    Strzałka, Dominik; Dymora, Paweł; Mazurek, Mirosław

    2018-02-01

    In this paper we present some preliminary results in the field of computer systems management with relation to Tsallis thermostatistics and the ubiquitous problem of hardware limited resources. In the case of systems with non-deterministic behaviour, management of their resources is a key point that guarantees theirs acceptable performance and proper working. This is very wide problem that stands for many challenges in financial, transport, water and food, health, etc. areas. We focus on computer systems with attention paid to cache memory and propose to use an analytical model that is able to connect non-extensive entropy formalism, long-range dependencies, management of system resources and queuing theory. Obtained analytical results are related to the practical experiment showing interesting and valuable results.

  4. THE USE OF KNOWLEDGE MANAGEMENT SYSTEMS AND EVENT-B MODELLING IN A LEAN ENTERPRISE

    Directory of Open Access Journals (Sweden)

    Ladislav Buřita

    2018-03-01

    Full Text Available This paper provides a case study describing an approach to improving the efficiency of an information system (IS by supporting processes outside the IS, using the ontology-driven knowledge management systems (KMS as a mini-application in the area of so-called lean enterprise. Lean enterprise is focused on creating a maximal value for final customers while eliminating all kinds of waste and unnecessary costs, which significantly helps to increase the level of its competitiveness. It is about managerial decision-making, which can be in some cases contradictory (solving a local problem can cause a problem in another place. In this paper, we describe the KMS ATOM, which supports the innovation process in a lean enterprise. We show how the risk of wrong decisions due to contradictory effects can be eliminated by implementing a safety-critical system into the traditional IS. Our model is supported by Event-B modelling, a refinement-based formal modelling method, which is successfully used in important areas such as infrastructure, medicine, nuclear engineering and transportation (fire alarm systems, robotic surgery machines, braking systems in transportation, etc.. Nowadays, Event-B modelling is starting to be used for various management decision-making activities, and it is becoming a powerful competitiveness tool. This paper introduces a simple example of how Event-B modelling and its proof obligations can help improve and automate the decision-making process by eliminating potential threats of inefficient decisions.

  5. Theoretical framework of integrated strategic performance management system

    OpenAIRE

    Mitrović, Zorica; Todorović, Marija; Bjelica, Dragan

    2015-01-01

    The aim of this paper is to present a conceptual model of the integrated strategic performance management system. This model is conceptual framework designed as a result of research that shows significant benefits of integrated application of strategic management and performance management in organizations. The framework consists of five steps: establishing a planning system, establishing of performance measurement system, establishing an accountability system, establishing of the knowledge m...

  6. Paradigms of knowledge management with systems modelling case studies

    CERN Document Server

    Pandey, Krishna Nath

    2016-01-01

    This book has been written by studying the knowledge management implementation at POWERGRID India, one of the largest power distribution companies in the world. The patterns which have led to models, both hypothesized and data-enabled, have been provided. The book suggests ways and means to follow for knowledge management implementation, especially for organizations with multiple business verticals to follow. The book underlines that knowledge is both an entity and organizational asset which can be managed. A holistic view of knowledge management implementation has been provided. It also emphasizes the phenomenological importance of human resource parameters as compared to that of technological parameters. Various hypotheses have been tested to validate the significant models hypothesized. This work will prove useful to corporations, researchers, and independent professionals working to study or implement knowledge management paradigms.

  7. Recent Progresses in Incorporating Human Land-Water Management into Global Land Surface Models Toward Their Integration into Earth System Models

    Science.gov (United States)

    Pokhrel, Yadu N.; Hanasaki, Naota; Wada, Yoshihide; Kim, Hyungjun

    2016-01-01

    The global water cycle has been profoundly affected by human land-water management. As the changes in the water cycle on land can affect the functioning of a wide range of biophysical and biogeochemical processes of the Earth system, it is essential to represent human land-water management in Earth system models (ESMs). During the recent past, noteworthy progress has been made in large-scale modeling of human impacts on the water cycle but sufficient advancements have not yet been made in integrating the newly developed schemes into ESMs. This study reviews the progresses made in incorporating human factors in large-scale hydrological models and their integration into ESMs. The study focuses primarily on the recent advancements and existing challenges in incorporating human impacts in global land surface models (LSMs) as a way forward to the development of ESMs with humans as integral components, but a brief review of global hydrological models (GHMs) is also provided. The study begins with the general overview of human impacts on the water cycle. Then, the algorithms currently employed to represent irrigation, reservoir operation, and groundwater pumping are discussed. Next, methodological deficiencies in current modeling approaches and existing challenges are identified. Furthermore, light is shed on the sources of uncertainties associated with model parameterizations, grid resolution, and datasets used for forcing and validation. Finally, representing human land-water management in LSMs is highlighted as an important research direction toward developing integrated models using ESM frameworks for the holistic study of human-water interactions within the Earths system.

  8. Quality management system in ISTC 'Ukryttia'

    International Nuclear Information System (INIS)

    Ershova, N.N.; Klyuchnikov, A.A.; Lagutin, I.G.

    2003-01-01

    Some structural and certification aspects of ISTC 'Ukryttia' quality system are seen,and main principles of adaptation of existing quality system model to quality management system model in conformity with ISO 9001:2000 standard are shown

  9. LCA of Solid Waste Management Systems

    DEFF Research Database (Denmark)

    Bakas, Ioannis; Laurent, Alexis; Clavreul, Julie

    2018-01-01

    The chapter explores the application of LCA to solid waste management systems through the review of published studies on the subject. The environmental implications of choices involved in the modelling setup of waste management systems are increasingly in the spotlight, due to public health...... concerns and new legislation addressing the impacts from managing our waste. The application of LCA to solid waste management systems, sometimes called “waste LCA”, is distinctive in that system boundaries are rigorously defined to exclude all life cycle stages except from the end-of-life. Moreover...... LCA on solid waste systems....

  10. Integrated therapy safety management system.

    Science.gov (United States)

    Podtschaske, Beatrice; Fuchs, Daniela; Friesdorf, Wolfgang

    2013-09-01

    The aim is to demonstrate the benefit of the medico-ergonomic approach for the redesign of clinical work systems. Based on the six layer model, a concept for an 'integrated therapy safety management' is drafted. This concept could serve as a basis to improve resilience. The concept is developed through a concept-based approach. The state of the art of safety and complexity research in human factors and ergonomics forms the basis. The findings are synthesized to a concept for 'integrated therapy safety management'. The concept is applied by way of example for the 'medication process' to demonstrate its practical implementation. The 'integrated therapy safety management' is drafted in accordance with the six layer model. This model supports a detailed description of specific work tasks, the corresponding responsibilities and related workflows at different layers by using the concept of 'bridge managers'. 'Bridge managers' anticipate potential errors and monitor the controlled system continuously. If disruptions or disturbances occur, they respond with corrective actions which ensure that no harm results and they initiate preventive measures for future procedures. The concept demonstrates that in a complex work system, the human factor is the key element and final authority to cope with the residual complexity. The expertise of the 'bridge managers' and the recursive hierarchical structure results in highly adaptive clinical work systems and increases their resilience. The medico-ergonomic approach is a highly promising way of coping with two complexities. It offers a systematic framework for comprehensive analyses of clinical work systems and promotes interdisciplinary collaboration. © 2013 The Authors. British Journal of Clinical Pharmacology © 2013 The British Pharmacological Society.

  11. Toward a Phase-Model of Global Knowledge Management Systems in Multinational Corporations

    DEFF Research Database (Denmark)

    Nielsen, Bo Bernhard; Michailova, Snejina

    2004-01-01

    According to Heinrich v. Pierer, CEO at Siemens, `an e-business year is only three months long. Ifyou want to be a leader in this fast-paced world, you must be faster than the others. Just being onboard is by far not enough'. The ability to be faster than others, however, is only relevant...... if it islinked to management of key assets in the pursuit of continuous competitive advantage. The keyasset of the present is knowledge and in the future it is likely to be continuous and timelyinnovation based on effective management of knowledge assets. Most firms today, however, lack aneffective Knowledge......-outperform competition and becomeleaders of the e-conomy'. Using examples from a number of large multinational companies thispaper proposes a phase model for the development of a global Knowledge Management Systemwith attention to pertinent policy and management issues in each stage.Keywords: Knowledge management system...

  12. Journal of Modeling, Design and Management of Engineering ...

    African Journals Online (AJOL)

    The Journal of Modeling, Design & Management of Engineering Systems publishes original ... systems Electronic/Electrical systems Engineering management systems Fuel and Energy systems Information Technology ... systems Pubic Health systems Software Engineering systems Systems and Industrial Engineering ...

  13. Waste management facilities cost information: System cost model product description. Revision 2

    International Nuclear Information System (INIS)

    Lundeen, A.S.; Hsu, K.M.; Shropshire, D.E.

    1996-02-01

    In May of 1994, Lockheed Idaho Technologies Company (LITCO) in Idaho Falls, Idaho and subcontractors developed the System Cost Model (SCM) application. The SCM estimates life-cycle costs of the entire US Department of Energy (DOE) complex for designing; constructing; operating; and decommissioning treatment, storage, and disposal (TSD) facilities for mixed low-level, low-level, transuranic, and mixed transuranic waste. The SCM uses parametric cost functions to estimate life-cycle costs for various treatment, storage, and disposal modules which reflect planned and existing facilities at DOE installations. In addition, SCM can model new facilities based on capacity needs over the program life cycle. The SCM also provides transportation costs for DOE wastes. Transportation costs are provided for truck and rail and include transport of contact-handled, remote-handled, and alpha (transuranic) wastes. The user can provide input data (default data is included in the SCM) including the volume and nature of waste to be managed, the time period over which the waste is to be managed, and the configuration of the waste management complex (i.e., where each installation's generated waste will be treated, stored, and disposed). Then the SCM uses parametric cost equations to estimate the costs of pre-operations (designing), construction costs, operation management, and decommissioning these waste management facilities

  14. Development of a system dynamics model for financially sustainable management of municipal watermain networks.

    Science.gov (United States)

    Rehan, R; Knight, M A; Unger, A J A; Haas, C T

    2013-12-15

    This paper develops causal loop diagrams and a system dynamics model for financially sustainable management of urban water distribution networks. The developed causal loop diagrams are a novel contribution in that it illustrates the unique characteristics and feedback loops for financially self-sustaining water distribution networks. The system dynamics model is a mathematical realization of the developed interactions among system variables over time and is comprised of three sectors namely watermains network, consumer, and finance. This is the first known development of a water distribution network system dynamics model. The watermains network sector accounts for the unique characteristics of watermain pipes such as service life, deterioration progression, pipe breaks, and water leakage. The finance sector allows for cash reserving by the utility in addition to the pay-as-you-go and borrowing strategies. The consumer sector includes controls to model water fee growth as a function of service performance and a household's financial burden due to water fees. A series of policy levers are provided that allow the impact of various financing strategies to be evaluated in terms of financial sustainability and household affordability. The model also allows for examination of the impact of different management strategies on the water fee in terms of consistency and stability over time. The paper concludes with a discussion on how the developed system dynamics water model can be used by water utilities to achieve a variety of utility short and long-term objectives and to establish realistic and defensible water utility policies. It also discusses how the model can be used by regulatory bodies, government agencies, the financial industry, and researchers. Crown Copyright © 2013. Published by Elsevier Ltd. All rights reserved.

  15. Model-based system engineering approach for the Euclid mission to manage scientific and technical complexity

    Science.gov (United States)

    Lorenzo Alvarez, Jose; Metselaar, Harold; Amiaux, Jerome; Saavedra Criado, Gonzalo; Gaspar Venancio, Luis M.; Salvignol, Jean-Christophe; Laureijs, René J.; Vavrek, Roland

    2016-08-01

    In the last years, the system engineering field is coming to terms with a paradigm change in the approach for complexity management. Different strategies have been proposed to cope with highly interrelated systems, system of systems and collaborative system engineering have been proposed and a significant effort is being invested into standardization and ontology definition. In particular, Model Based System Engineering (MBSE) intends to introduce methodologies for a systematic system definition, development, validation, deployment, operation and decommission, based on logical and visual relationship mapping, rather than traditional 'document based' information management. The practical implementation in real large-scale projects is not uniform across fields. In space science missions, the usage has been limited to subsystems or sample projects with modeling being performed 'a-posteriori' in many instances. The main hurdle for the introduction of MBSE practices in new projects is still the difficulty to demonstrate their added value to a project and whether their benefit is commensurate with the level of effort required to put them in place. In this paper we present the implemented Euclid system modeling activities, and an analysis of the benefits and limitations identified to support in particular requirement break-down and allocation, and verification planning at mission level.

  16. Managing geometric information with a data base management system

    Science.gov (United States)

    Dube, R. P.

    1984-01-01

    The strategies for managing computer based geometry are described. The computer model of geometry is the basis for communication, manipulation, and analysis of shape information. The research on integrated programs for aerospace-vehicle design (IPAD) focuses on the use of data base management system (DBMS) technology to manage engineering/manufacturing data. The objectives of IPAD is to develop a computer based engineering complex which automates the storage, management, protection, and retrieval of engineering data. In particular, this facility must manage geometry information as well as associated data. The approach taken on the IPAD project to achieve this objective is discussed. Geometry management in current systems and the approach taken in the early IPAD prototypes are examined.

  17. Geographical Information System Model for Potential Mines Data Management Presentation in Kabupaten Gorontalo

    Science.gov (United States)

    Roviana, D.; Tajuddin, A.; Edi, S.

    2017-03-01

    Mining potential in Indonesian is very abundant, ranging from Sabang to Marauke. Kabupaten Gorontalo is one of many places in Indonesia that have different types of minerals and natural resources that can be found in every district. The abundant of mining potential must be balanced with good management and ease of getting information by investors. The current issue is, (1) ways of presenting data/information about potential mines area is still manually (the maps that already capture from satellite image, then printed and attached to information board in the office) it caused the difficulties of getting information; (2) the high cost of maps printing; (3) the difficulties of regency leader (bupati) to obtain information for strategic decision making about mining potential. The goal of this research is to build a model of Geographical Information System that could provide data management of potential mines, so that the investors could easily get information according to their needs. To achieve that goal Research and Development method is used. The result of this research, is a model of Geographical Information System that implemented in an application to presenting data management of mines.

  18. An integrated chronic disease management model: a diagonal approach to health system strengthening in South Africa.

    Science.gov (United States)

    Mahomed, Ozayr Haroon; Asmall, Shaidah; Freeman, Melvyn

    2014-11-01

    The integrated chronic disease management model provides a systematic framework for creating a fundamental change in the orientation of the health system. This model adopts a diagonal approach to health system strengthening by establishing a service-linked base to training, supervision, and the opportunity to try out, assess, and implement integrated interventions.

  19. Knowledge management systems success in healthcare: Leadership matters.

    Science.gov (United States)

    Ali, Nor'ashikin; Tretiakov, Alexei; Whiddett, Dick; Hunter, Inga

    2017-01-01

    To deliver high-quality healthcare doctors need to access, interpret, and share appropriate and localised medical knowledge. Information technology is widely used to facilitate the management of this knowledge in healthcare organisations. The purpose of this study is to develop a knowledge management systems success model for healthcare organisations. A model was formulated by extending an existing generic knowledge management systems success model by including organisational and system factors relevant to healthcare. It was tested by using data obtained from 263 doctors working within two district health boards in New Zealand. Of the system factors, knowledge content quality was found to be particularly important for knowledge management systems success. Of the organisational factors, leadership was the most important, and more important than incentives. Leadership promoted knowledge management systems success primarily by positively affecting knowledge content quality. Leadership also promoted knowledge management use for retrieval, which should lead to the use of that better quality knowledge by the doctors, ultimately resulting in better outcomes for patients. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  20. Coupled economic-ecological models for ecosystem-based fishery management: Exploration of trade-offs between model complexity and management needs

    DEFF Research Database (Denmark)

    Thunberg, Eric; Holland, Dan; Nielsen, J. Rasmus

    2012-01-01

    Ecosystem based fishery management has moved beyond rhetorical statements calling for a more holistic approach to resource management, to implementing decisions on resource use that are compatible with goals of maintaining ecosystem health and resilience. Coupled economic-ecological models...... are a primary tool for informing these decisions. Recognizing the importance of these models, the International Council for the Exploration of the Seas (ICES) formed a Study Group on Integration of Economics, Stock Assessment and Fisheries Management (SGIMM) to explore alternative modelling approaches...... and ecological systems are inherently complex, models are abstractions of these systems incorporating varying levels of complexity depending on available data and the management issues to be addressed. The objective of this special session was to assess the pros and cons of increasing model complexity...

  1. A Systems Modeling Approach for Risk Management of Command File Errors

    Science.gov (United States)

    Meshkat, Leila

    2012-01-01

    The main cause of commanding errors is often (but not always) due to procedures. Either lack of maturity in the processes, incompleteness of requirements or lack of compliance to these procedures. Other causes of commanding errors include lack of understanding of system states, inadequate communication, and making hasty changes in standard procedures in response to an unexpected event. In general, it's important to look at the big picture prior to making corrective actions. In the case of errors traced back to procedures, considering the reliability of the process as a metric during its' design may help to reduce risk. This metric is obtained by using data from Nuclear Industry regarding human reliability. A structured method for the collection of anomaly data will help the operator think systematically about the anomaly and facilitate risk management. Formal models can be used for risk based design and risk management. A generic set of models can be customized for a broad range of missions.

  2. Automated plant, production management system

    Science.gov (United States)

    Aksenova, V. I.; Belov, V. I.

    1984-12-01

    The development of a complex of tasks for the operational management of production (OUP) within the framework of an automated system for production management (ASUP) shows that it is impossible to have effective computations without reliable initial information. The influence of many factors involving the production and economic activity of the entire enterprise upon the plan and course of production are considered. It is suggested that an adequate model should be available which covers all levels of the hierarchical system: workplace, section (bridgade), shop, enterprise, and the model should be incorporated into the technological sequence of performance and there should be provisions for an adequate man machine system.

  3. A Cryogenic Fluid System Simulation in Support of Integrated Systems Health Management

    Science.gov (United States)

    Barber, John P.; Johnston, Kyle B.; Daigle, Matthew

    2013-01-01

    Simulations serve as important tools throughout the design and operation of engineering systems. In the context of sys-tems health management, simulations serve many uses. For one, the underlying physical models can be used by model-based health management tools to develop diagnostic and prognostic models. These simulations should incorporate both nominal and faulty behavior with the ability to inject various faults into the system. Such simulations can there-fore be used for operator training, for both nominal and faulty situations, as well as for developing and prototyping health management algorithms. In this paper, we describe a methodology for building such simulations. We discuss the design decisions and tools used to build a simulation of a cryogenic fluid test bed, and how it serves as a core technology for systems health management development and maturation.

  4. XCPU2 process management system

    Energy Technology Data Exchange (ETDEWEB)

    Ionkov, Latchesar [Los Alamos National Laboratory; Van Hensbergen, Eric [IBM AUSTIN RESEARCH LAB

    2009-01-01

    Xcpu2 is a new process management system that allows the users to specify custom file system for a running job. Most cluster management systems enforce single software distribution running on all nodes. Xcpu2 allows programs running on the cluster to work in environment identical to the user's desktop, using the same versions of the libraries and tools the user installed locally, and accessing the configuration file in the same places they are located on the desktop. Xcpu2 builds on our earlier work with the Xcpu system. Like Xcpu, Xcpu2's process management interface is represented as a set of files exported by a 9P file server. It supports heterogeneous clusters and multiple head nodes. Unlike Xcpu, it uses pull instead of push model. In this paper we describe the Xcpu2 clustering model, its operation and how the per-job filesystem configuration can be used to solve some of the common problems when running a cluster.

  5. Urban stormwater - greywater management system for sustainable urban water management at sub-watershed level

    Science.gov (United States)

    Singh Arora, Amarpreet

    2017-11-01

    Urban water management involves urban water supply (import, treatment and distribution of water), urban wastewater management (collection, treatment and disposal of urban sewage) and urban storm water management. Declining groundwater tables, polluted and declining sources of water, water scarcity in urban areas, unsatisfactory urban water supply and sanitation situation, pollution of receiving water bodies (including the ground water), and urban floods have become the concerns and issues of sustainable urban water management. This paper proposes a model for urban stormwater and sewage management which addresses these concerns and issues of sustainable urban water management. This model proposes segregation of the sewage into black water and greywater, and urban sub-watershed level stormwater-greywater management systems. During dry weather this system will be handling only the greywater and making the latter available as reclaimed water for reuse in place of the fresh water supply. During wet weather, the system will be taking care of (collection and treatment) both the storm water and the greywater, and the excess of the treated water will be disposed off through groundwater recharging. Application of this model in the Patiala city, Punjab, INDIA for selected urban sub-watersheds has been tried. Information and background data required for the conceptualization and design of the sub-watershed level urban stormwater-greywater management system was collected and the system has been designed for one of the sub-watersheds in the Patiala city. In this paper, the model for sustainable urban water management and the design of the Sub-watershed level Urban Stormwater-Greywater Management System are described.

  6. Prototype Development of an ICT System to Support Construction Management Based on Virtual Models and RFID

    DEFF Research Database (Denmark)

    Sørensen, Kristian Birch; Christiansson, Per; Svidt, Kjeld

    2009-01-01

    early example) of an ICT system was carried out to identify and formalise user needs in relation to construction management based on virtual models and radio frequency identification (RFID). The prototype was developed to support working processes in real-time project progress management, quality...

  7. Model-Based Requirements Management in Gear Systems Design Based On Graph-Based Design Languages

    Directory of Open Access Journals (Sweden)

    Kevin Holder

    2017-10-01

    Full Text Available For several decades, a wide-spread consensus concerning the enormous importance of an in-depth clarification of the specifications of a product has been observed. A weak clarification of specifications is repeatedly listed as a main cause for the failure of product development projects. Requirements, which can be defined as the purpose, goals, constraints, and criteria associated with a product development project, play a central role in the clarification of specifications. The collection of activities which ensure that requirements are identified, documented, maintained, communicated, and traced throughout the life cycle of a system, product, or service can be referred to as “requirements engineering”. These activities can be supported by a collection and combination of strategies, methods, and tools which are appropriate for the clarification of specifications. Numerous publications describe the strategy and the components of requirements management. Furthermore, recent research investigates its industrial application. Simultaneously, promising developments of graph-based design languages for a holistic digital representation of the product life cycle are presented. Current developments realize graph-based languages by the diagrams of the Unified Modelling Language (UML, and allow the automatic generation and evaluation of multiple product variants. The research presented in this paper seeks to present a method in order to combine the advantages of a conscious requirements management process and graph-based design languages. Consequently, the main objective of this paper is the investigation of a model-based integration of requirements in a product development process by means of graph-based design languages. The research method is based on an in-depth analysis of an exemplary industrial product development, a gear system for so-called “Electrical Multiple Units” (EMU. Important requirements were abstracted from a gear system

  8. The Evolution of Cooperation in Managed Groundwater Systems: An Agent-Based Modelling Approach

    Science.gov (United States)

    Castilla Rho, J. C.; Mariethoz, G.; Rojas, R. F.; Andersen, M. S.; Kelly, B. F.; Holley, C.

    2014-12-01

    Human interactions with groundwater systems often exhibit complex features that hinder the sustainable management of the resource. This leads to costly and persistent conflicts over groundwater at the catchment scale. One possible way to address these conflicts is by gaining a better understanding of how social and groundwater dynamics coevolve using agent-based models (ABM). Such models allow exploring 'bottom-up' solutions (i.e., self-organised governance systems), where the behaviour of individual agents (e.g., farmers) results in the emergence of mutual cooperation among groundwater users. There is significant empirical evidence indicating that this kind of 'bottom-up' approach may lead to more enduring and sustainable outcomes, compared to conventional 'top-down' strategies such as centralized control and water right schemes (Ostrom 1990). New modelling tools are needed to study these concepts systematically and efficiently. Our model uses a conceptual framework to study cooperation and the emergence of social norms as initially proposed by Axelrod (1986), which we adapted to groundwater management. We developed an ABM that integrates social mechanisms and the physics of subsurface flow. The model explicitly represents feedback between groundwater conditions and social dynamics, capturing the spatial structure of these interactions and the potential effects on cooperation levels in an agricultural setting. Using this model, we investigate a series of mechanisms that may trigger norms supporting cooperative strategies, which can be sustained and become stable over time. For example, farmers in a self-monitoring community can be more efficient at achieving the objective of sustainable groundwater use than government-imposed regulation. Our coupled model thus offers a platform for testing new schemes promoting cooperation and improved resource use, which can be used as a basis for policy design. Importantly, we hope to raise awareness of agent-based modelling as

  9. Introduction to data base management systems

    International Nuclear Information System (INIS)

    Rossiter, B.N.

    1984-01-01

    Data base management systems offer considerable advantages over elementary filing systems under favourable circumstances such as where data structures and applications are continually changing. The architecture of such systems and the manner in which they work is described, with particular attention to data independence. An introduction is made to the classification of data base management systems by the data structuring models that they employ. (orig.)

  10. High-performance work systems in health care management, part 1: development of an evidence-informed model.

    Science.gov (United States)

    Garman, Andrew N; McAlearney, Ann Scheck; Harrison, Michael I; Song, Paula H; McHugh, Megan

    2011-01-01

    : Although management practices are recognized as important factors in improving health care quality and efficiency, most research thus far has focused on individual practices, ignoring or underspecifying the contexts within which these practices are operating. Research from other industries, which has increasingly focused on systems rather than individual practices, has yielded results that may benefit health services management. : Our goal was to develop a conceptual model on the basis of prior research from health care as well as other industries that could be used to inform important contextual considerations within health care. : Using theoretical frameworks from A. Donabedian (1966), P. M. Wright, T. M. Gardner, and L. M. Moynihan (2003), and B. Schneider, D. B. Smith, and H. W. Goldstein (2000) and review methods adapted from R. Pawson (2006b), we reviewed relevant research from peer-reviewed and other industry-relevant sources to inform our model. The model we developed was then reviewed with a panel of practitioners, including experts in quality and human resource management, to assess the applicability of the model to health care settings. : The resulting conceptual model identified four practice bundles, comprising 14 management practices as well as nine factors influencing adoption and perceived sustainability of these practices. The mechanisms by which these practices influence care outcomes are illustrated using the example of hospital-acquired infections. In addition, limitations of the current evidence base are discussed, and an agenda for future research in health care settings is outlined. : Results may help practitioners better conceptualize management practices as part of a broader system of work practices. This may, in turn, help practitioners to prioritize management improvement efforts more systematically.

  11. Model-Based Off-Nominal State Isolation and Detection System for Autonomous Fault Management, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed model-based Fault Management system addresses the need for cost-effective solutions that enable higher levels of onboard spacecraft autonomy to reliably...

  12. Model-Based Off-Nominal State Isolation and Detection System for Autonomous Fault Management, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed model-based Fault Management system addresses the need for cost-effective solutions that enable higher levels of onboard spacecraft autonomy to reliably...

  13. Systems analysis support to the waste management technology center

    International Nuclear Information System (INIS)

    Rivera, A.L.; Osborne-Lee, I.W.; DePaoli, S.M.

    1988-01-01

    This paper describes a systems analysis concept being developed in support of waste management planning and analysis activities for Martin Marietta Energy Systems, Inc. (Energy Systems), sites. This integrated systems model serves as a focus for the accumulation and documentation of technical and economic information from current waste management practices, improved operations projects, remedial actions, and new system development activities. The approach is generic and could be applied to a larger group of sites. This integrated model is a source of technical support to waste management groups in the Energy Systems complex for integrated waste management planning and related technology assessment activities. This problem-solving methodology for low-level waste (LLW) management is being developed through the Waste Management Technology Center (WMTC) for the Low-Level Waste Disposal, Development, and Demonstration (LLWDDD) Program. In support of long-range planning activities, this capability will include the development of management support tools such as specialized systems models, data bases, and information systems. These management support tools will provide continuing support in the identification and definition of technical and economic uncertainties to be addressed by technology demonstration programs. Technical planning activities and current efforts in the development of this system analysis capability for the LLWDDD Program are presented in this paper

  14. Environmental management: A system approach

    Science.gov (United States)

    Petak, William J.

    1981-05-01

    This paper presents a system framework whose purpose is to improve understanding of environmental management. By analyzing the links between elements of the environmental management system, it is possible to construct a model that aids thinking systematically about the decision-making subsystem, and other subsystems, of the entire environmental management system. Through a multidisciplinary environmental approach, each of the individual subsystems is able to adapt to threats and opportunities. The fields of government, market economics, social responsibility and ecology, for example, are so complex that it is extremely difficult to develop a framework that gives full consideration to all aspects. This paper, through the application of a highly idealized system framework, attempts to show the general relationships that exist between complex system elements.

  15. Existence crises of actual financial management systems

    OpenAIRE

    SVASTA Mihai

    2009-01-01

    The present financial management systems reflects only partially the economic reality and they are no longer able to act as an instrument for the management. It is absurd that an economy populated by business models based on 21st century technology to use financial management systems based mainly on the same principles formalised by Luca Paciolli in 1494. Therefore, one of the causes of the current economic crisis could be the lack of coordination between the evolution of the business models ...

  16. Environmental system analysis of waste management. Experiences from applications of the ORWARE model

    Energy Technology Data Exchange (ETDEWEB)

    Bjoerklund, Anna

    2000-11-01

    Waste management has gone through a history of shifting problems, demands, and strategies over the years. In contrast to the long prevailing view that the problem could be solved by hiding or moving it, waste is now viewed as a problem ranging from local to global concern, and as being an integral part of several sectors in society. Decisive for this view has been society's increasing complexity and thus the increasing complexity of waste, together with a general development of environmental consciousness, moving from local focus on point emission sources, to regional and global issues of more complex nature. This thesis is about the development and application ORWARE; a model for computer aided environmental systems analysis of municipal waste management. Its origin is the hypothesis that widened perspectives are needed in waste management decision-making to avoid severe sub-optimisation of environmental performance. With a strong foundation in life cycle assessment (LCA), ORWARE aims to cover the environmental impacts over the entire life cycle of waste management. It also performs substance flow analysis (SFA) calculations at a rather detailed level of the system. Applying ORWARE has confirmed the importance of applying systems perspective and of taking into account site specific differences in analysis and planning of waste management, rather than relying on overly simplified solutions. Some findings can be generalised and used as guidelines to reduce environmental impact of waste management. Recovery of material and energy resources from waste generally leads to net reductions in energy use and environmental impact, because of the savings this brings about in other sectors. Waste treatment with low rate of energy and materials recovery should therefore be avoided. The exact choice of technology however depends on what products can be recovered and how they are used. Despite the complexity of the model and a certain degree of user unfriendliness, involved

  17. DIRAC Data Management System

    CERN Document Server

    Smith, A C

    2007-01-01

    The LHCb experiment being built to utilize CERN’s flagship Large Hadron Collider will generate data to be analysed by a community of over 600 physicists worldwide. DIRAC, LHCb’s Workload and Data Management System, facilitates the use of underlying EGEE Grid resources to generate, process and analyse this data in the distributed environment. The Data Management System, presented here, provides real-time, data-driven distribution in accordance with LHCb’s Computing Model. The data volumes produced by the LHC experiments are unprecedented, rendering individual institutes and even countries, unable to provide the computing and storage resources required to make full use of the produced data. EGEE Grid resources allow the processing of LHCb data possible in a distributed fashion and LHCb’s Computing Model is based on this approach. Data Management in this environment requires reliable and high-throughput transfer of data, homogeneous access to storage resources and the cataloguing of data replicas, all of...

  18. DISEASE MANAGEMENT INFORMATION SYSTEM

    OpenAIRE

    Bens Pardamean; Anindito; Anjela Djoeang; Nana Tobing

    2013-01-01

    The study designed an information system model for Disease Management (DisMan) that met the specifications and needs of a consumer electronics manufacturer. The diseases monitored by this study were diabetes, hypertension and tuberculosis. Data were collected through interviews with the companyâs human resources department and occupational health provider. As for the model, literature and online research were conducted to collect health standards and information system standards on existing D...

  19. Interdisciplinary semantic model for managing the design of a steam-assisted gravity drainage tooling system

    Directory of Open Access Journals (Sweden)

    Michael Leitch

    2018-01-01

    Full Text Available Complex engineering systems often require extensive coordination between different expert areas in order to avoid costly design iterations and rework. Cyber-physics system (CPS engineering methods could provide valuable insights to help model these interactions and optimize the design of such systems. In this work, steam assisted gravity drainage (SAGD, a complex oil extraction process that requires deep understanding of several physical-chemical phenomena, is examined whereby the complexities and interdependencies of the system are explored. Based on an established unified feature modeling scheme, a software modeling framework is proposed to manage the design process of the production tools used for SAGD oil extraction. Applying CPS methods to unify complex phenomenon and engineering models, the proposed CPS model combines effective simulation with embedded knowledge of completion tooling design in order to optimize reservoir performance. The system design is expressed using graphical diagrams of the unified modelling language (UML convention. To demonstrate the capability of this system, a distributed research group is described, and their activities coordinated using the described CPS model.

  20. Management Index Systems and Energy Efficiency Diagnosis Model for Power Plant: Cases in China

    Directory of Open Access Journals (Sweden)

    Jing-Min Wang

    2016-01-01

    Full Text Available In recent years, the energy efficiency of thermal power plant largely contributes to that of the industry. A thorough understanding of influencing factors, as well as the establishment of scientific and comprehensive diagnosis model, plays a key role in the operational efficiency and competitiveness for the thermal power plant. Referring to domestic and abroad researches towards energy efficiency management, based on Cloud model and data envelopment analysis (DEA model, a qualitative and quantitative index system and a comprehensive diagnostic model (CDM are construed. To testify rationality and usability of CDM, case studies of large-scaled Chinese thermal power plants have been conducted. In this case, CDM excavates such qualitative factors as technology, management, and so forth. The results shows that, compared with conventional model, which only considered production running parameters, the CDM bears better adaption to reality. It can provide entities with efficient instruments for energy efficiency diagnosis.

  1. EASEWASTE-life cycle modeling capabilities for waste management technologies

    DEFF Research Database (Denmark)

    Bhander, Gurbakhash Singh; Christensen, Thomas Højlund; Hauschild, Michael Zwicky

    2010-01-01

    Background, Aims and Scope The management of municipal solid waste and the associated environmental impacts are subject of growing attention in industrialized countries. EU has recently strongly emphasized the role of LCA in its waste and resource strategies. The development of sustainable solid...... waste management systems applying a life-cycle perspective requires readily understandable tools for modelling the life cycle impacts of waste management systems. The aim of the paper is to demonstrate the structure, functionalities and LCA modelling capabilities of the PC-based life cycle oriented...... waste management model EASEWASTE, developed at the Technical University of Denmark specifically to meet the needs of the waste system developer with the objective to evaluate the environmental performance of the various elements of existing or proposed solid waste management systems. Materials...

  2. Model Development of Rainwater Management for Agriculture Decision Support System in Semi Arid Area

    Directory of Open Access Journals (Sweden)

    Tunggul S.

    2011-01-01

    Full Text Available Land cultivation for agricultural purposes in semiarid area is usually carried out only once a year specifically during the rainy season. The condition is even worse since it is not without the risk of failure because of dry-spell or water-logging. To cope with this situation, the researchers developed a model of Rainwater Management for Agriculture Decision Supporting System (RMA-DSS. The objective of this RMA-DSS is to facilitate the decision making to build water infrastructure. Using this program it is hoped that sufficient water supply for specific crops with correct planting time can be guaranteed, which in turn will optimize harvest. The model consists of three parts, namely, rainfall-runoff-infiltration model, crop water requirement-irrigation-drainage model and rainwater management for agriculture model. The Models are designed using Microsoft Excel’s Macro Visual Basic and finalized with Visual Basic language program for operating spatial database of map object and non spatial database.

  3. Model of Quality Management System Using Malcolm Baldrige Criteria in Nursing Education in Surabaya

    Directory of Open Access Journals (Sweden)

    A. Aziz Alimul Hidayat

    2015-04-01

    Full Text Available Introduction: Most of the quality of Nursing Education in Surabaya is still at the low level. It is due to the fact that the process and job performances which have not been integrated yet, systematic and fl exible which are in line with the capacity of the organization and the needs of graduates. This study aims to develop a model of quality management systems of Nursing bachelor’s degree program based on the Malcolm Baldrige Criteria For Performance Excellence. Method: The method used is a cross sectional survey design. This research was conducted with a sample of eight institutions and twenty four of respondents. The data was collected by means of interviews, questionnaires and documentation. Analysis of the data used Partial Least Square (PLS. Result: The results showed that 1 leadership affects the study program as well as the profi le that affects job performances; 2 Leadership affects the strategic planning as well as the strategic planning that affects focus of Human Resources. In addition, the focus of human resources affects the focus process and fi nally affects job performances as well; 3 customer focus affects leadership as well as leadership affects strategic planning. As the impact, strategic planning affects focus of human resources and it affects similarly on the focus process and fi nally affects job performances; 4 All variables are affected by measurements, analysis and knowledge management, except in strategic planning. Discussion: Based on the above results, the model of quality management system can be developed by using the Malcolm Baldrige criteria for the purpose of increasing the quality of Nursing Study Program. On the other hands, this model can be used as a reference of the organization at the level of Nursing Study Program (Strategic Business Unit to restructure the performance of the college in global competition. Keywords: model of quality management system, nursing study program, malcolm baldrige criteria for

  4. Thermal Management Tools for Propulsion System Trade Studies and Analysis

    Science.gov (United States)

    McCarthy, Kevin; Hodge, Ernie

    2011-01-01

    Energy-related subsystems in modern aircraft are more tightly coupled with less design margin. These subsystems include thermal management subsystems, vehicle electric power generation and distribution, aircraft engines, and flight control. Tighter coupling, lower design margins, and higher system complexity all make preliminary trade studies difficult. A suite of thermal management analysis tools has been developed to facilitate trade studies during preliminary design of air-vehicle propulsion systems. Simulink blocksets (from MathWorks) for developing quasi-steady-state and transient system models of aircraft thermal management systems and related energy systems have been developed. These blocksets extend the Simulink modeling environment in the thermal sciences and aircraft systems disciplines. The blocksets include blocks for modeling aircraft system heat loads, heat exchangers, pumps, reservoirs, fuel tanks, and other components at varying levels of model fidelity. The blocksets have been applied in a first-principles, physics-based modeling and simulation architecture for rapid prototyping of aircraft thermal management and related systems. They have been applied in representative modern aircraft thermal management system studies. The modeling and simulation architecture has also been used to conduct trade studies in a vehicle level model that incorporates coupling effects among the aircraft mission, engine cycle, fuel, and multi-phase heat-transfer materials.

  5. Improvement of the Model of Enterprise Management Process on the Basis of General Management Functions

    Directory of Open Access Journals (Sweden)

    Ruslan Skrynkovskyy

    2017-12-01

    Full Text Available The purpose of the article is to improve the model of the enterprise (institution, organization management process on the basis of general management functions. The graphic model of the process of management according to the process-structured management is presented. It has been established that in today's business environment, the model of the management process should include such general management functions as: 1 controlling the achievement of results; 2 planning based on the main goal; 3 coordination and corrective actions (in the system of organization of work and production; 4 action as a form of act (conscious, volitional, directed; 5 accounting system (accounting, statistical, operational-technical and managerial; 6 diagnosis (economic, legal with such subfunctions as: identification of the state and capabilities; analysis (economic, legal, systemic with argumentation; assessment of the state, trends and prospects of development. The prospect of further research in this direction is: 1 the formation of a system of interrelation of functions and management methods, taking into account the presented research results; 2 development of the model of effective and efficient communication business process of the enterprise.

  6. System Dynamics Modeling on Integrated Supply Chain Management of Potato Agribusiness

    Directory of Open Access Journals (Sweden)

    Lukman Hakim

    2017-12-01

    Full Text Available The objectives of this study is to design a model of integrated supply chain management of potato agribusiness in an effort to increase revenue and bargaining position of farmers in Aceh Province. The method applied to achieve these objectives was the methodology of system dynamics. Formulation of the models was conducted by using Vensim DSS Software, followed by simulation. The result of this study showed the role of five major scenarios which were important to actualize the integrated supply chain management of potato agribusiness in Aceh Province, those were: scenario 1, increasing the productive land area, resulting in the increasing of production volume; scenario 2, using the certified potato seed named “umbi G2”, generating the higher level of production; scenario 3, providing the certified potato seed based on the needs, showing that the quantity of production increased; scenario 4, shortening the payment receivables interval of farmers and cooperatives, which showing the increasing of cash amount; scenario 5, doing certification to the potato from synergistic partnerships farmers, showing the increasing of acceptance, profitability, R/C, and cash.

  7. Mathematical model as means of optimization of the automation system of the process of incidents of information security management

    Directory of Open Access Journals (Sweden)

    Yulia G. Krasnozhon

    2018-03-01

    Full Text Available Modern information technologies have an increasing importance for development dynamics and management structure of an enterprise. The management efficiency of implementation of modern information technologies directly related to the quality of information security incident management. However, issues of assessment of the impact of information security incidents management on quality and efficiency of the enterprise management system are not sufficiently highlighted neither in Russian nor in foreign literature. The main direction to approach these problems is the optimization of the process automation system of the information security incident management. Today a special attention is paid to IT-technologies while dealing with information security incidents at mission-critical facilities in Russian Federation such as the Federal Tax Service of Russia (FTS. It is proposed to use the mathematical apparatus of queueing theory in order to build a mathematical model of the system optimization. The developed model allows to estimate quality of the management taking into account the rules and restrictions imposed on the system by the effects of information security incidents. Here an example is given in order to demonstrate the system in work. The obtained statistical data are shown. An implementation of the system discussed here will improve the quality of the Russian FTS services and make responses to information security incidents faster.

  8. Social responsibility as a management system

    Directory of Open Access Journals (Sweden)

    Nuria Arimany-Serrat

    2018-02-01

    Originality/value: The study identifies a business management system that continuously organises and improves the performances of a company in the area of Corporate Social Responsibility, through audited certification that enhances the competitivity of companies that hold the international standard. The study also demonstrates the need for a management system to integrate into business models.

  9. Diversity in case management modalities: the Summit model.

    Science.gov (United States)

    Peterson, G A; Drone, I D; Munetz, M R

    1997-06-01

    Though ubiquitous in community mental health agencies, case management suffers from a lack of consensus regarding its definition, essential components, and appropriate application. Meaningful comparisons of various case management models await such a consensus. Global assessments of case management must be replaced by empirical studies of specific interventions with respect to the needs of specific populations. The authors describe a highly differentiated and prescriptive system of case management involving the application of more than one model of service delivery. Such a diversified and targeted system offers an opportunity to study the technology of case management in a more meaningful manner.

  10. Trust Management System for Opportunistic Cloud Services

    DEFF Research Database (Denmark)

    Kuada, Eric

    2013-01-01

    We have over the past three years been working on the feasibility of Opportunistic Cloud Services (OCS) for enterprises. OCS is about enterprises strategically contributing and utilizing spare IT resources as cloud services. One of the major challenges that such a platform faces is data security...... and trust management issues. This paper presents a trust management system for OCS platforms. It models the concept of trust and applies it to OCS platforms. The trust model and the trust management system are verified through the simulation of the computation of the trust values with Infrastructure...

  11. Modeling of processes of an adaptive business management

    Directory of Open Access Journals (Sweden)

    Karev Dmitry Vladimirovich

    2011-04-01

    Full Text Available On the basis of the analysis of systems of adaptive management board business proposed the original version of the real system of adaptive management, the basis of which used dynamic recursive model cash flow forecast and real data. Proposed definitions and the simulation of scales and intervals of model time in the control system, as well as the thresholds observations and conditions of changing (correction of the administrative decisions. The process of adaptive management is illustrated on the basis proposed by the author of the script of development of business.

  12. Towards a Business Process Modeling Technique for Agile Development of Case Management Systems

    Directory of Open Access Journals (Sweden)

    Ilia Bider

    2017-12-01

    Full Text Available A modern organization needs to adapt its behavior to changes in the business environment by changing its Business Processes (BP and corresponding Business Process Support (BPS systems. One way of achieving such adaptability is via separation of the system code from the process description/model by applying the concept of executable process models. Furthermore, to ease introduction of changes, such process model should separate different perspectives, for example, control-flow, human resources, and data perspectives, from each other. In addition, for developing a completely new process, it should be possible to start with a reduced process model to get a BPS system quickly running, and then continue to develop it in an agile manner. This article consists of two parts, the first sets requirements on modeling techniques that could be used in the tools that supports agile development of BPs and BPS systems. The second part suggests a business process modeling technique that allows to start modeling with the data/information perspective which would be appropriate for processes supported by Case or Adaptive Case Management (CM/ACM systems. In a model produced by this technique, called data-centric business process model, a process instance/case is defined as sequence of states in a specially designed instance database, while the process model is defined as a set of rules that set restrictions on allowed states and transitions between them. The article details the background for the project of developing the data-centric process modeling technique, presents the outline of the structure of the model, and gives formal definitions for a substantial part of the model.

  13. A development of logistics management models for the Space Transportation System

    Science.gov (United States)

    Carrillo, M. J.; Jacobsen, S. E.; Abell, J. B.; Lippiatt, T. F.

    1983-01-01

    A new analytic queueing approach was described which relates stockage levels, repair level decisions, and the project network schedule of prelaunch operations directly to the probability distribution of the space transportation system launch delay. Finite source population and limited repair capability were additional factors included in this logistics management model developed specifically for STS maintenance requirements. Data presently available to support logistics decisions were based on a comparability study of heavy aircraft components. A two-phase program is recommended by which NASA would implement an integrated data collection system, assemble logistics data from previous STS flights, revise extant logistics planning and resource requirement parameters using Bayes-Lin techniques, and adjust for uncertainty surrounding logistics systems performance parameters. The implementation of these recommendations can be expected to deliver more cost-effective logistics support.

  14. Dynamic room pricing model for hotel revenue management systems

    Directory of Open Access Journals (Sweden)

    Heba Abdel Aziz

    2011-11-01

    Full Text Available This paper addresses the problem of room pricing in hotels. We propose a hotel revenue management model based on dynamic pricing to provide hotel managers with a flexible and efficient decision support tool for room revenue maximization. The two pillars of the proposed framework are a novel optimization model, and a multi-class scheme similar to the one implemented in airlines. Our hypothesis is that this framework can overcome the limitations associated with the research gaps in pricing literature; and can also contribute significantly in increasing the revenue of hotels. We test this hypothesis on three different approaches, and the results show an increase in revenue compared to the classical model used in literature.

  15. A Structural Model Decomposition Framework for Systems Health Management

    Data.gov (United States)

    National Aeronautics and Space Administration — Systems health management (SHM) is an impor- tant set of technologies aimed at increasing system safety and reliability by detecting, isolating, and identifying...

  16. The role of models in managing the uncertainty of software-intensive systems

    International Nuclear Information System (INIS)

    Littlewood, Bev; Neil, Martin; Ostrolenk, Gary

    1995-01-01

    It is increasingly argued that uncertainty is an inescapable feature of the design and operational behaviour of software-intensive systems. This paper elaborates the role of models in managing such uncertainty, in relation to evidence and claims for dependability. Personal and group models are considered with regard to abstraction, consensus and corroboration. The paper focuses on the predictive property of models, arguing for the need for empirical validation of their trustworthiness through experimentation and observation. The impact on trustworthiness of human fallibility, formality of expression and expressiveness is discussed. The paper identifies two criteria for deciding the degree of trust to be placed in a model, and hence also for choosing between models, namely accuracy and informativeness. Finally, analogy and reuse are proposed as the only means by which empirical evidence can be established for models in software engineering

  17. Modelling vital success factors in adopting personalized medicine system in healthcare technology and management

    Directory of Open Access Journals (Sweden)

    Subhas C. Misra

    2018-06-01

    Full Text Available Biomedical engineering has grown as a vast field of research that includes many areas of engineering and technology also. Personalized Medicine is an emerging approach in today’s medicare system. It bears a very strong potential to consolidate modern e-health systems fundamentally. Scientists have already discovered some of the personalized drugs that can shift the whole medicare system into a new dimension. However, bringing the change in the whole medicare system is not an easy task. There are several factors that can affect the successful adoption of Personalized Medicine systems in the healthcare management sector. This paper aims at identifying the critical factors with the help of an empirical study. A questionnaire was distributed amongst some clinicians, clinical researchers, practitioners in pharmaceutical industries, regulatory board members, and a larger section of patients. The response data collected thereby were analyzed by using appropriate statistical methods. Based on the statistical analysis, an attempt is made to prepare a list of critical success factors in the adoption of personalized medicine in healthcare management. The study indicates that eight of the thirteen hypothesized factors have statistical relationship with “Success”. The important success factors detected are: data management, team work and composition, privacy and confidentiality, mind-set, return on investment, sufficient time, R&D and alignment. To the best of our knowledge, this is the first academic paper in which an attempt has been made to model the vital critical factors for the successful implementation of Personalized Medicine in healthcare management. The study bears the promise of important applications in healthcare engineering and technology. Keywords: Healthcare management, Personalized medicine, E-health, Success factors, Medicare systems, Regression analysis

  18. Managing organizational culture within a management system

    International Nuclear Information System (INIS)

    Comeau, L.; Watts, G.

    2009-01-01

    The Point Lepreau Generating Station (PLGS) is currently undergoing a major refurbishment of its nuclear reactor. At the same time, a small team is designing the organization that will operate the plant after refurbishment. This paper offers a high level overview of the Post-Refurbishment Organization (PRO) project and will focus primarily on the approach used to address organizational culture and human system dynamics. We will describe how various tools, used to assess organization culture, team performance, and individual self-understanding, are used collectively to place the right person in the right position. We will explain how the career system, Pathfinder, is used to integrate these tools to support a comprehensive model for organization design and development. Finally, we demonstrate how the management of organizational cultural and human system dynamics are integrated into the PLGS Integrated Management System. (author)

  19. Metering systems and demand-side management models applied to hybrid renewable energy systems in micro-grid configuration

    International Nuclear Information System (INIS)

    Blasques, L.C.M.; Pinho, J.T.

    2012-01-01

    This paper proposes a demand-side management model integrated to a metering system for hybrid renewable energy systems in micro-grid configuration. The proposal is based on the management problems verified in most of this kind of renewable hybrid systems installed in Brazil. The main idea is the implementation of a pre-paid metering system with some control functions that directly act on the consumer demand, restricting the consumption proportionally to the monthly availability of renewable energy. The result is a better distribution of the electricity consumption by month and by consumer, preventing that only one user, with larger purchasing power, consumes all the renewable energy available at some time period. The proportionality between the consumption and the renewable energy's availability has the objective to prevent a lack of energy stored and a high use of the diesel generator-set on months of low renewable potential. This paper also aims to contribute to the Brazilian regulation of renewable energy systems supplying micro-grids. - Highlights: ► Review of the Brazilian electricity regulation for small-scale isolated systems. ► Renewable systems are the most feasible option in several isolated communities. ► One proposal is to guarantee government subsidies for renewable energy systems. ► Smart electronic meters to create electricity restrictions for the consumers.

  20. Operational Management System for Regulated Water Systems

    Science.gov (United States)

    van Loenen, A.; van Dijk, M.; van Verseveld, W.; Berger, H.

    2012-04-01

    Most of the Dutch large rivers, canals and lakes are controlled by the Dutch water authorities. The main reasons concern safety, navigation and fresh water supply. Historically the separate water bodies have been controlled locally. For optimizating management of these water systems an integrated approach was required. Presented is a platform which integrates data from all control objects for monitoring and control purposes. The Operational Management System for Regulated Water Systems (IWP) is an implementation of Delft-FEWS which supports operational control of water systems and actively gives advice. One of the main characteristics of IWP is that is real-time collects, transforms and presents different types of data, which all add to the operational water management. Next to that, hydrodynamic models and intelligent decision support tools are added to support the water managers during their daily control activities. An important advantage of IWP is that it uses the Delft-FEWS framework, therefore processes like central data collection, transformations, data processing and presentation are simply configured. At all control locations the same information is readily available. The operational water management itself gains from this information, but it can also contribute to cost efficiency (no unnecessary pumping), better use of available storage and advise during (water polution) calamities.

  1. Computer aided modeling and expert systems add a needed dimension to water management in power plant operations

    International Nuclear Information System (INIS)

    Gill, P.H. Jr.

    1991-01-01

    This paper reports on computer modeling and expert systems applications in water management used to develop appropriate treatment recommendations and monitoring/control functions. Chemical treatment program development in recirculating cooling water (CALGUARD), one-through scale inhibition (THRUGARUD), once through corrosion control (OSCAR), as well as internal boiler water chemistry control (POWER-CHEM), and on-line real time system monitoring (HELMSMAN) plan an increasingly important role in power plant water management practices

  2. ENVIRONMENTAL RESPONSIBILITY MODEL BASED ON ISO 14000 MANAGEMENT SYSTEMS

    OpenAIRE

    Catalina SITNIKOV

    2012-01-01

    Worldwide corporations, as well as their stakeholders, are more conscious of the need for environmental management, SR behaviour, and sustainable growth and development. International Standards are becoming more significant for corporations to work towards common environmental management practices. ISO 14001 is the first and the broadest standard intended at a more responsible approach of corporations and the world’s most acknowledged framework for environmental management systems that assist...

  3. Mine railway equipments management information system

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, X.; Han, K.; Duan, T.; Liu, Z.; Lu, H. [China University of Mining and Technology, Xuzhou (China)

    2007-06-15

    Based on client/server and browser/server models, the management information system described realized the entire life-cycle management of mine railway equipment which included universal equipment and special equipment in the locomotive depot, track maintenance division, electrical depot and car depot. The system has other online functions such as transmitting reports, graphics management, statistics, searches, graphics wizard and web propaganda. It was applied in Pingdingshan Coal Co. Ltd.'s Railway Transport Department. 5 refs., 4 figs.

  4. MODELING AND STRUCTURING OF ENTERPRISE MANAGEMENT SYSTEM RESORT SPHERE BASED ON ELEMENTS OF NEURAL NETWORK THEORY: THE METHODOLOGICAL BASIS

    Directory of Open Access Journals (Sweden)

    Rena R. Timirualeeva

    2015-01-01

    Full Text Available The article describes the methodology of modeling andstructuring of business networks theory. Accounting ofenvironmental factors mega-, macro- and mesolevels, theinternal state of the managed system and the error management command execution by control system implemented inthis. The proposed methodology can improve the quality of enterprise management of resort complex through a moreflexible response to changes in the parameters of the internaland external environments.

  5. Modelling the Success of Learning Management Systems: Application of Latent Class Segmentation Using FIMIX-PLS

    Science.gov (United States)

    Arenas-Gaitán, Jorge; Rondán-Cataluña, Francisco Javier; Ramírez-Correa, Patricio E.

    2018-01-01

    There is not a unique attitude towards the implementation of digital technology in educational sceneries. This paper aims to validate an adaptation of the DeLone and McLean information systems success model in the context of a learning management system. Furthermore, this study means to prove (1) the necessity of segmenting students in order to…

  6. An integrated system dynamics model developed for managing lake water quality at the watershed scale.

    Science.gov (United States)

    Liu, Hui; Benoit, Gaboury; Liu, Tao; Liu, Yong; Guo, Huaicheng

    2015-05-15

    A reliable system simulation to relate socioeconomic development with water environment and to comprehensively represent a watershed's dynamic features is important. In this study, after identifying lake watershed system processes, we developed a system dynamics modeling framework for managing lake water quality at the watershed scale. Two reinforcing loops (Development and Investment Promotion) and three balancing loops (Pollution, Resource Consumption, and Pollution Control) were constituted. Based on this work, we constructed Stock and Flow Diagrams that embedded a pollutant load model and a lake water quality model into a socioeconomic system dynamics model. The Dianchi Lake in Yunnan Province, China, which is the sixth largest and among the most severely polluted freshwater lakes in China, was employed as a case study to demonstrate the applicability of the model. Water quality parameters considered in the model included chemical oxygen demand (COD), total nitrogen (TN), and total phosphorus (TP). The business-as-usual (BAU) scenario and three alternative management scenarios on spatial adjustment of industries and population (S1), wastewater treatment capacity construction (S2), and structural adjustment of agriculture (S3), were simulated to assess the effectiveness of certain policies in improving water quality. Results showed that S2 is most effective scenario, and the COD, TN, and TP concentrations in Caohai in 2030 are 52.5, 10.9, and 0.8 mg/L, while those in Waihai are 9.6, 1.2, and 0.08 mg/L, with sustained development in the watershed. Thus, the model can help support the decision making required in development and environmental protection strategies. Copyright © 2015 Elsevier Ltd. All rights reserved.

  7. Modeling and Simulation Resource Repository (MSRR)(System Engineering/Integrated M&S Management Approach

    Science.gov (United States)

    Milroy, Audrey; Hale, Joe

    2006-01-01

    NASA s Exploration Systems Mission Directorate (ESMD) is implementing a management approach for modeling and simulation (M&S) that will provide decision-makers information on the model s fidelity, credibility, and quality, including the verification, validation and accreditation information. The NASA MSRR will be implemented leveraging M&S industry best practices. This presentation will discuss the requirements that will enable NASA to capture and make available the "meta data" or "simulation biography" data associated with a model. The presentation will also describe the requirements that drive how NASA will collect and document relevant information for models or suites of models in order to facilitate use and reuse of relevant models and provide visibility across NASA organizations and the larger M&S community.

  8. CRISIS: A System for Risk Management

    Directory of Open Access Journals (Sweden)

    Erica Y. Sanchez

    2012-12-01

    Full Text Available In a situation of an unexpected catastrophe, uncertainty and demand for information are constant. In such a disaster scenario, the CRISIS system arises as a tool to contribute to previous coordination, procedure validation, exercise execution, a good and frequent communication among organizations, and weakness and threat assessment for an appropriate risk management. It offers a wide variety of tools for online communication, consultation and collaboration that, up to this day, includes cartography, tasks, resources, news, forums, instant messaging and chat. As a complement, mathematical models for training and emergency management are being researched and developed. For Argentinean society, it is a necessity to switch from the current handcrafted, bureaucratic emergency management method to a decision-making management model. Previous coordination, exercise execution, a fluid communication among institutions, and threats and weaknesses assessment are required for a proper risk management. With that goal in mind, it is important to reduce confusion, avoid the duplication of efforts to fulfill the same tasks, and have access to a complete vision of the situation, generated from the data of all the organizations taking part. The CRISIS system is a secure web application, accessible to every node in a network formed by the organizations which have complementary responsibilities during prevention and response. It offers a wide variety of tools for online communication, consultation and collaboration that, up to this day, includes cartography, tasks, media (organization and resources, news, forums, instant messaging and chat. As a complement, mathematical models for training and emergency management are being researched and developed. Currently, there are toxicological and epidemiological emergency models available. The present paper analyses, from the perspectives related to risk management for emergencies and disasters, the strengths and weaknesses

  9. A Cognitive System Model for Human/Automation Dynamics in Airspace Management

    Science.gov (United States)

    Corker, Kevin M.; Pisanich, Gregory; Lebacqz, J. Victor (Technical Monitor)

    1997-01-01

    NASA has initiated a significant thrust of research and development focused on providing the flight crew and air traffic managers automation aids to increase capacity in en route and terminal area operations through the use of flexible, more fuel-efficient routing, while improving the level of safety in commercial carrier operations. In that system development, definition of cognitive requirements for integrated multi-operator dynamic aiding systems is fundamental. In order to support that cognitive function definition, we have extended the Man Machine Integrated Design and Analysis System (MIDAS) to include representation of multiple cognitive agents (both human operators and intelligent aiding systems) operating aircraft, airline operations centers and air traffic control centers in the evolving airspace. The demands of this application require representation of many intelligent agents sharing world-models, and coordinating action/intention with cooperative scheduling of goals and actions in a potentially unpredictable world of operations. The MIDAS operator models have undergone significant development in order to understand the requirements for operator aiding and the impact of that aiding in the complex nondeterminate system of national airspace operations. The operator model's structure has been modified to include attention functions, action priority, and situation assessment. The cognitive function model has been expanded to include working memory operations including retrieval from long-term store, interference, visual-motor and verbal articulatory loop functions, and time-based losses. The operator's activity structures have been developed to include prioritization and interruption of multiple parallel activities among multiple operators, to provide for anticipation (knowledge of the intention and action of remote operators), and to respond to failures of the system and other operators in the system in situation-specific paradigms. The model's internal

  10. Complexity, Modeling, and Natural Resource Management

    Directory of Open Access Journals (Sweden)

    Paul Cilliers

    2013-09-01

    Full Text Available This paper contends that natural resource management (NRM issues are, by their very nature, complex and that both scientists and managers in this broad field will benefit from a theoretical understanding of complex systems. It starts off by presenting the core features of a view of complexity that not only deals with the limits to our understanding, but also points toward a responsible and motivating position. Everything we do involves explicit or implicit modeling, and as we can never have comprehensive access to any complex system, we need to be aware both of what we leave out as we model and of the implications of the choice of our modeling framework. One vantage point is never sufficient, as complexity necessarily implies that multiple (independent conceptualizations are needed to engage the system adequately. We use two South African cases as examples of complex systems - restricting the case narratives mainly to the biophysical domain associated with NRM issues - that make the point that even the behavior of the biophysical subsystems themselves are already complex. From the insights into complex systems discussed in the first part of the paper and the lessons emerging from the way these cases have been dealt with in reality, we extract five interrelated generic principles for practicing science and management in complex NRM environments. These principles are then further elucidated using four further South African case studies - organized as two contrasting pairs - and now focusing on the more difficult organizational and social side, comparing the human organizational endeavors in managing such systems.

  11. Systems thinking benefits in supply change management:an illustration of the viable systems model in a supply chain

    OpenAIRE

    Chronéer, Diana; Mirijamdotter, Anita

    2009-01-01

    Existing product development models are solely an organisational matter. They do not take into consideration the whole supply chain and its different actors. We investigate in this paper how Supply Chain Management (SCM) and Viable System Model (VSM) can support and create an effective use of information in product development and hence identify critical linkages in the supply chain. The aim is to introduce VSM as a framework that enable an analysis of company's supply chains and visualize vi...

  12. A model for managing sources of groundwater pollution

    Science.gov (United States)

    Gorelick, Steven M.

    1982-01-01

    The waste disposal capacity of a groundwater system can be maximized while maintaining water quality at specified locations by using a groundwater pollutant source management model that is based upon linear programing and numerical simulation. The decision variables of the management model are solute waste disposal rates at various facilities distributed over space. A concentration response matrix is used in the management model to describe transient solute transport and is developed using the U.S. Geological Survey solute transport simulation model. The management model was applied to a complex hypothetical groundwater system. Large-scale management models were formulated as dual linear programing problems to reduce numerical difficulties and computation time. Linear programing problems were solved using a numerically stable, available code. Optimal solutions to problems with successively longer management time horizons indicated that disposal schedules at some sites are relatively independent of the number of disposal periods. Optimal waste disposal schedules exhibited pulsing rather than constant disposal rates. Sensitivity analysis using parametric linear programing showed that a sharp reduction in total waste disposal potential occurs if disposal rates at any site are increased beyond their optimal values.

  13. Integrated Modeling of the Human-Natural System to Improve Local Water Management and Planning

    Science.gov (United States)

    Gutowski, W. J., Jr.; Dziubanski, D.; Franz, K.; Goodwin, J.; Rehmann, C. R.; Simpkins, W. W.; Tesfastion, L.; Wanamaker, A. D.; Jie, Y.

    2015-12-01

    Communities across the world are experiencing the effects of unsustainable water management practices. Whether the problem is a lack of water, too much water, or water of degraded quality, finding acceptable solutions requires community-level efforts that integrate sound science with local needs and values. Our project develops both a software technology (agent-based hydrological modeling) and a social technology (a participatory approach to model development) that will allow communities to comprehensively address local water challenges. Using agent-based modeling (ABM), we are building a modeling system that includes a semi-distributed hydrologic process model coupled with agent (stakeholder) models. Information from the hydrologic model is conveyed to the agent models, which, along with economic information, determine appropriate agent actions that subsequently affect hydrology within the model. The iterative participatory modeling (IPM) process will assist with the continual development of the agent models. Further, IPM creates a learning environment in which all participants, including researchers, are co-exploring relevant data, possible scenarios and solutions, and viewpoints through continuous interactions. Our initial work focuses on the impact of flood mitigation and conservation efforts on reducing flooding in an urban area. We are applying all research elements above to the Squaw Creek watershed that flows through parts of four counties in central Iowa. The watershed offers many of the typical tensions encountered in Iowa, such as different perspectives on water management between upstream farmers and downstream urban areas, competition for various types of recreational services, and increasing absentee land ownership that may conflict with community values. Ultimately, climate change scenarios will be incorporated into the model to determine long term patterns that may develop within the social or natural system.

  14. GIBSI: an integrated modelling system for watershed management – sample applications and current developments

    Directory of Open Access Journals (Sweden)

    A. N. Rousseau

    2007-11-01

    Full Text Available Hydrological and pollutant fate models have long been developed for research purposes. Today, they find an application in integrated watershed management, as decision support systems (DSS. GIBSI is such a DSS designed to assist stakeholders in watershed management. It includes a watershed database coupled to a GIS and accessible through a user-friendly interface, as well as modelling tools that simulate, on a daily time step, hydrological processes such as evapotranspiration, runoff, soil erosion, agricultural pollutant transport and surface water quality. Therefore, GIBSI can be used to assess a priori the effect of management scenarios (reservoirs, land use, waste water effluents, diffuse sources of pollution that is agricultural pollution on surface hydrology and water quality. For illustration purposes, this paper presents several management-oriented applications using GIBSI on the 6680 km2 Chaudière River watershed, located near Quebec City (Canada. They include impact assessments of: (i municipal clean water program; (ii agricultural nutrient management scenarios; (iii past and future land use changes, as well as (iv determination of achievable performance standards of pesticides management practices. Current and future developments of GIBSI are also presented as these will extend current uses of this tool and make it useable and applicable by stakeholders on other watersheds. Finally, the conclusion emphasizes some of the challenges that remain for a better use of DSS in integrated watershed management.

  15. Management system requirements for small reactors

    Energy Technology Data Exchange (ETDEWEB)

    Jones, K.A., E-mail: kenneth.jones@cnsc-ccsn.gc.ca [Canadian Nuclear Safety Commission, Ottawa, Ontario (Canada)

    2013-07-01

    This abstract identifies the management system requirements for the life cycle of small reactors from initial conception through completion of decommissioning. For small reactors, the requirements for management systems remain the same as those for 'large' reactors regardless of the licensee' business model and objectives. The CSA N-Series of standards provides an interlinked set of requirements for the management of nuclear facilities. CSA N286 provides overall direction to management to develop and implement sound management practices and controls, while other CSA nuclear standards provide technical requirements and guidance that support the management system. CSA N286 is based on a set of principles. The principles are then supported by generic requirements that are applicable to the life cycle of nuclear facilities. CNSC regulatory documents provide further technical requirements and guidance. (author)

  16. End-user satisfaction analysis on library management system unnes using technology acceptance model towards national standard of integrated library

    Science.gov (United States)

    Hardyanto, W.; Purwinarko, A.; Adhi, M. A.

    2018-03-01

    The library which is the gate of the University should be supported by the existence of an adequate information system, to provide excellent service and optimal to every user. Library management system that has been in existence since 2009 needs to be re-evaluated so that the system can meet the needs of both operator and Unnes user in particular, and users from outside Unnes in general. This study aims to evaluate and improve the existing library management system to produce a system that is accountable and able to meet the needs of end users, as well as produce a library management system that is integrated Unnes. Research is directed to produce evaluation report with Technology Acceptance Model (TAM) approach and library management system integrated with the national standard.

  17. Modelling and simulating a crisis management system: an organisational perspective

    Science.gov (United States)

    Chaawa, Mohamed; Thabet, Inès; Hanachi, Chihab; Ben Said, Lamjed

    2017-04-01

    Crises are complex situations due to the dynamism of the environment, its unpredictability and the complexity of the interactions among several different and autonomous involved organisations. In such a context, establishing an organisational view as well as structuring organisations' communications and their functioning is a crucial requirement. In this article, we propose a multi-agent organisational model (OM) to abstract, simulate and analyse a crisis management system (CMS). The objective is to evaluate the CMS from an organisational view, to assess its strength as well as its weakness and to provide deciders with some recommendations for a more flexible and reactive CMS. The proposed OM is illustrated through a real case study: a snowstorm in a Tunisian region. More precisely, we made the following contribution: firstly, we provide an environmental model that identifies the concepts involved in the crisis. Then, we define a role model that copes with the involved actors. In addition, we specify the organisational structure and the interaction model that rule communications and structure actors' functioning. Those models, built following the GAIA methodology, abstract the CMS from an organisational perspective. Finally, we implemented a customisable multi-agent simulator based on the Janus platform to analyse, through several performed simulations, the organisational model.

  18. Integrated management system

    International Nuclear Information System (INIS)

    Florescu, N.

    2003-01-01

    A management system is developed in order to reflect the needs of the business and to ensure that the objectives of the organization will be achieved. The process model and each individual process within the system then needs to identify the drives or requirements from external customers and stakeholders, regulations, and standards such as ISO and 50-C-Q. The processes are then developed to address these drivers. Developing the process in this way makes it fully integrated and capable of incorporating any new requirements. The International Standard (ISO 9000:2000) promotes the adoption of a process approach when developing, implementing and improving the effectiveness of a quality management system to enhance customer satisfaction by meeting customer requirements. The IAEA Code recognizes that the entire work is a process which can be planned, assessed and improved. For an organization to function effectively, numerous linked activities have to be identified and managed. By definition a process is an activity that using resources and taking into account all the constraints imposed executes the necessary operations which transform the inputs in outcomes. Running a system of processes within an organization, identification of the interaction between the processes and their management can be referred to as a 'process approach'. The advantage of such an approach is the ensuring of the ongoing control over the linkage between the individual processes composing the system as well as over their combination and interaction. Developing a management system implies: identification of the process which delivers Critical Success Factor (CSFs) of the business; identifying the support processes enabling the CSFs to be accomplished; identifying the processes that deliver the business fundamentals. An integrated management system should include all activities not only those related to Quality, Health and Safety. When developing an IMS it is necessary to identify all of the drivers

  19. SMS and Web-Based e-Government Model Case Study: Citizens Complaints Management System at District of Gihosha –Burundi

    Directory of Open Access Journals (Sweden)

    Mugenzi Thierry

    2017-01-01

    Full Text Available E-Government basically comprises the use of electronic communications technologies such as the internet, in enhancing and advancing the citizens access to public services. In most developing countries including Burundi, citizens are facing many difficulties for accessing public services. One of the identified problems is the poor quality of service in managing citizens’ complaints. This study proposes an SMS and web based e-Government Model as a solution. In this study, a case study of a complaint management system at District of Gihosha has been used as a reference to prove that SMS and Web based e-Government Model can enhances the access of public services. The objective of this study is the development of an SMS and web-based system that can enhances the process and the management of citizens’ complaints at District of Gihosha. The system has been developed using PHP as front end, Apache as web server, MySQL as Database and Gammu as SMS gateway. The obtained results after testing the system shows that all the functionalities of the developed system worked properly. Thus, the SMS and web based complaint management system developed is considered to be effective.

  20. A navigational evaluation model for content management systems

    International Nuclear Information System (INIS)

    Gilani, S.; Majeed, A.

    2016-01-01

    Web applications are widely used world-wide, however it is important that the navigation of these websites is effective, to enhance usability. Navigation is not limited to links between pages, it is also how we complete a task. Navigational structure presented as hypertext is one of the most important component of the Web application besides content and presentation. The main objective of this paper is to explore the navigational structure of various open source Content Management Systems from the developer's perspective. For this purpose three CMS are chosen which are WordPress, Joomla, and Drupal. Objective of the research is to identify the important navigational aspects present in these CMSs. Moreover, a comparative study of these CMSs in terms of navigational support is required. For this purpose an industrial survey is conducted based on our proposed navigational evaluation model. The results shows that there exist correlation between the identified factors and these CMSs provide helpful and effective navigational support to their users. (author)

  1. Efficiency analysis system of material management

    Directory of Open Access Journals (Sweden)

    Bogusław Śliwczyński

    2012-12-01

    Full Text Available Background: Significant scope of enterprise's efficiency management is improving of material management process both the strategic and operational level. The complexity of material flow processes can lead to a threat such as distraction and disintegration of analysis focusing on many different factors influenced on effective sourcing and procurement management, transport and warehousing processes, inventory management, working capital and cash flow management. Material and methods: The presented article focuses on multidimensional and multi-criteria analysis of material management efficiency that is considered as decision support system. Authors have presented results of the research regarding ineffective material management confirm insufficient analytical supporting in various decisions of procurement operations. Results and conclusions: Based on research results authors presented in the article model of efficiency analysis system of material management.

  2. MANAGING THE INTERACTION OF RESOURCE DISTRIBUTION IN PROJECT MANAGEMENT OF IMPLEMENTATION AND FUNCTIONING OF EMERGENCY CALL SYSTEMS

    Directory of Open Access Journals (Sweden)

    Дмитро Сергійович КОБИЛКІН

    2016-02-01

    Full Text Available There have been proposed to use a mobile module "Resources manager" and its component model – scheme for managing the distribution of resources during the project management of implementation and functioning of System 112 in Ukraine. Are described the formalized tasks of performance the processes of managing the model – scheme at all stages of the projects life cycle. Also is developed the model – scheme interaction the blocks of the mobile module of resource management at the System 112 project. It describes the step by step interaction of blocks project management with the project data for successful project implementation and obtaining a product of the project, pointing out the environmental impact of the project on each of the project blocks. The conclusions about the expediency and efficiency of implementation of model – scheme in conditions of managing the emergency call systems at a single number were made.

  3. Public Management Information Systems: Theory and Prescription.

    Science.gov (United States)

    Bozeman, Barry; Bretschneider, Stuart

    1986-01-01

    The existing theoretical framework for research in management information systems (MIS) is criticized for its lack of attention to the external environment of organizations, and a new framework is developed which better accommodates MIS in public organizations: public management information systems. Four models of publicness that reflect external…

  4. Natural treatment system models for wastewater management: a study from Hyderabad, India.

    Science.gov (United States)

    Sonkamble, Sahebrao; Wajihuddin, Md; Jampani, Mahesh; Sarah, S; Somvanshi, V K; Ahmed, Shakeel; Amerasinghe, Priyanie; Boisson, Alexandre

    2018-01-01

    Wastewater generated on a global scale has become a significant source of water resources which necessitates appropriate management strategies. However, the complexities associated with wastewater are lack of economically viable treatment systems, especially in low- and middle-income countries. While many types of treatment systems are needed to serve the various local issues, we propose natural treatment systems (NTS) such as natural wetlands that are eco-friendly, cost-effective, and can be jointly driven by public bodies and communities. In order for it to be part of wastewater management, this study explores the NTS potential for removal of pollutants, cost-effectiveness, and reuse options for the 1.20 million m 3 /day of wastewater generated in Hyderabad, India. The pilot study includes hydro-geophysical characterization of natural wetland to determine pollutant removal efficiency and its effective utilization for treated wastewater in the peri-urban habitat. The results show the removal of organic content (76-78%), nutrients (77-97%), and microbes (99.5-99.9%) from the wetland-treated wastewater and its suitability for agriculture applications. Furthermore, the wetland efficiency integrated with engineered interventions led to the development of NTS models with different application scenarios: (i) constructed wetlands, (ii) minimized community wetlands, and (iii) single outlet system, suitable for urban, peri-urban and rural areas, respectively.

  5. Development of a Knowledge Management Model for the Development of a Quality Public Sector Management System for the Office of the Primary Educational Service Area

    Science.gov (United States)

    Khotbancha, Wijitra; Chantarasombat, Chalard; Sriampai, Anan

    2015-01-01

    The objectives of this research were: 1) to study the current situation and problem of Knowledge Management of the office of the primary education service area, 2) to develop a Knowledge Management model, 3) to study the success of the implementation of the Knowledge Management system. There were 25 persons in the target group. There were 2 kinds…

  6. Developing Pavement Distress Deterioration Models for Pavement Management System Using Markovian Probabilistic Process

    Directory of Open Access Journals (Sweden)

    Promothes Saha

    2017-01-01

    Full Text Available In the state of Colorado, the Colorado Department of Transportation (CDOT utilizes their pavement management system (PMS to manage approximately 9,100 miles of interstate, highways, and low-volume roads. Three types of deterioration models are currently being used in the existing PMS: site-specific, family, and expert opinion curves. These curves are developed using deterministic techniques. In the deterministic technique, the uncertainties of pavement deterioration related to traffic and weather are not considered. Probabilistic models that take into account the uncertainties result in more accurate curves. In this study, probabilistic models using the discrete-time Markov process were developed for five distress indices: transverse, longitudinal, fatigue, rut, and ride indices, as a case study on low-volume roads. Regression techniques were used to develop the deterioration paths using the predicted distribution of indices estimated from the Markov process. Results indicated that longitudinal, fatigue, and rut indices had very slow deterioration over time, whereas transverse and ride indices showed faster deterioration. The developed deterioration models had the coefficient of determination (R2 above 0.84. As probabilistic models provide more accurate results, it is recommended that these models be used as the family curves in the CDOT PMS for low-volume roads.

  7. The system of management of innovative potential of economic systems

    Directory of Open Access Journals (Sweden)

    Kostyshak Mikhail

    2018-01-01

    Full Text Available The purpose of the research is to develop a mechanism for managing the innovative potential of a development organization, which is capable to ensure the transformation of real estate objects due to the changes in market needs. The main approaches to the development of innovative potential of economic systems are presented. Efficiency criteria of management of innovation potential of development organizations are formed. A model based on joint use of system and resource and potential approaches to the management of innovative potential of a development organization is formed. The analysis of modern tendencies of development of innovative potential of economic systems, based on rationalization of management of innovative potential of a development organization is conducted.

  8. Dynamic information architecture system (DIAS) : multiple model simulation management

    International Nuclear Information System (INIS)

    Simunich, K. L.; Sydelko, P.; Dolph, J.; Christiansen, J.

    2002-01-01

    Dynamic Information Architecture System (DIAS) is a flexible, extensible, object-based framework for developing and maintaining complex multidisciplinary simulations of a wide variety of application contexts. The modeling domain of a specific DIAS-based simulation is determined by (1) software Entity (domain-specific) objects that represent the real-world entities that comprise the problem space (atmosphere, watershed, human), and (2) simulation models and other data processing applications that express the dynamic behaviors of the domain entities. In DIAS, models communicate only with Entity objects, never with each other. Each Entity object has a number of Parameter and Aspect (of behavior) objects associated with it. The Parameter objects contain the state properties of the Entity object. The Aspect objects represent the behaviors of the Entity object and how it interacts with other objects. DIAS extends the ''Object'' paradigm by abstraction of the object's dynamic behaviors, separating the ''WHAT'' from the ''HOW.'' DIAS object class definitions contain an abstract description of the various aspects of the object's behavior (the WHAT), but no implementation details (the HOW). Separate DIAS models/applications carry the implementation of object behaviors (the HOW). Any model deemed appropriate, including existing legacy-type models written in other languages, can drive entity object behavior. The DIAS design promotes plug-and-play of alternative models, with minimal recoding of existing applications. The DIAS Context Builder object builds a constructs or scenario for the simulation, based on developer specification and user inputs. Because DIAS is a discrete event simulation system, there is a Simulation Manager object with which all events are processed. Any class that registers to receive events must implement an event handler (method) to process the event during execution. Event handlers can schedule other events; create or remove Entities from the

  9. The PDS4 Metadata Management System

    Science.gov (United States)

    Raugh, A. C.; Hughes, J. S.

    2018-04-01

    We present the key features of the Planetary Data System (PDS) PDS4 Information Model as an extendable metadata management system for planetary metadata related to data structure, analysis/interpretation, and provenance.

  10. SYSTEM DYNAMICS OF MANAGEMENT OF "UNFORESEEN CIRCUMSTANCES" OF THE PROJECT

    OpenAIRE

    Богдан Владимирович ГАЙДАБРУС; Евгений Анатольевич ДРУЖИНИН

    2015-01-01

    Approaches for project contingency management through risk management and influence of stakeholders. Proposed system dynamic contingency project management model. The model describes the effects of various factors on the phase of project management through contingency.

  11. Seven business models for decision management

    NARCIS (Netherlands)

    dr. Martijn Zoet; Eline de Haan; Koen Smit

    2016-01-01

    Research, advisory companies, consultants and system integrators all predict that a lot of money will be earned with decision management (business rules, algorithms and analytics). But how can you actually make money with decision management or in other words: Which business models are exactly

  12. Experiences with a technically oriented plant management system; Erfahrungen mit einem technisch orientierten Betriebs-Management-System

    Energy Technology Data Exchange (ETDEWEB)

    Haffmann, E. [GiS Gesellschaft fuer integrierte Systemplanung mbH, Erlangen (Germany)

    2000-07-01

    This contribution first deals with the duality of mercantile and technical plant management systems. The following aspects are considered: reasons for and history of this duality; different approaches taken by mercantile and technical plant management systems; differences in the standardisability of mercantile and technical tasks. Dissolution of the duality through coordinated interplay. The author then goes on to explain the most important components of technically oriented maintenance management. These include the collection of technical plant data (with maintenance-relevant data and relations); the establishment of recurring tasks, the commissioning method (involving occupational safety, packaging and evaluation), compilation of manuals, reporting and accompanying plant documentation. The following tools are useful for DP-assisted maintenance: depiction of organisational and operational structures (authorisation system + IBFS application); workflow systems; modelling (data and object models); navigators; form and dialogue generators; integration of external software (project planning, CAD and Office); interface to mercantile systems. Some highlights of the C/S-IBFS were demonstrated in practice at the symposium. [German] Das Referat behandelt zunaechst die Dualitaet von kaufmaennischen und technischen Betriebs-Management-Systemen anhand folgender Aspekte: - Gruende und Historie dieser Dualitaet, - unterschiedliche Loesungsansaetze von kaufmaennischen und technischen Betriebs-Management-Systemen, - unterschiedliche Standardisierbarkeit von kaufmaennischen und technischen Aufgabenstellungen, - Aufloesung der Dualitaet durch koordniertes Zusammenwirken. Sodann werden wichtige Bausteine eines technisch orientierten Instandhaltungs-Managements erlaeutert. Dazu gehoeren die technische Anlagenerfassung (mit instandhaltungsrelevanten Daten und Relationen), die Einrichtung wiederkehrender Aufgaben, das Arbeitsauftragsverfahren (mit Arbeitssicherheit, Paketierung und

  13. FORECASTING MODELS IN MANAGEMENT

    OpenAIRE

    Sindelar, Jiri

    2008-01-01

    This article deals with the problems of forecasting models. First part of the article is dedicated to definition of the relevant areas (vertical and horizontal pillar of definition) and then the forecasting model itself is defined; as article presents theoretical background for further primary research, this definition is crucial. Finally the position of forecasting models within the management system is identified. The paper is a part of the outputs of FEM CULS grant no. 1312/11/3121.

  14. Specification and design of a Therapy Imaging and Model Management System (TIMMS)

    Science.gov (United States)

    Lemke, Heinz U.; Berliner, Leonard

    2007-03-01

    Appropriate use of Information and Communication Technology (ICT) and Mechatronic (MT) systems is considered by many experts as a significant contribution to improve workflow and quality of care in the Operating Room (OR). This will require a suitable IT infrastructure as well as communication and interface standards, such as DICOM and suitable extensions, to allow data interchange between surgical system components in the OR. A conceptual design of such an infrastructure, i.e. a Therapy Imaging and Model Management System (TIMMS) will be introduced in this paper. A TIMMS should support the essential functions that enable and advance image, and in particular, patient model guided therapy. Within this concept, the image centric world view of the classical PACS technology is complemented by an IT model-centric world view. Such a view is founded in the special modelling needs of an increasing number of modern surgical interventions as compared to the imaging intensive working mode of diagnostic radiology, for which PACS was originally conceptualised and developed. A proper design of a TIMMS, taking into account modern software engineering principles, such as service oriented architecture, will clarify the right position of interfaces and relevant standards for a Surgical Assist System (SAS) in general and their components specifically. Such a system needs to be designed to provide a highly modular structure. Modules may be defined on different granulation levels. A first list of components (e.g. high and low level modules) comprising engines and repositories of an SAS, which should be integrated by a TIMMS, will be introduced in this paper.

  15. A PC-based discrete event simulation model of the civilian radioactive waste management system

    International Nuclear Information System (INIS)

    Airth, G.L.; Joy, D.S.; Nehls, J.W.

    1992-01-01

    This paper discusses a System Simulation Model which has been developed for the Department of Energy to simulate the movement of individual waste packages (spent fuel assemblies and fuel containers) through the Civilian Radioactive Waste Management System (CRWMS). A discrete event simulation language, GPSS/PC, which runs on an IBM/PC and operates under DOS 5.0, mathematically represents the movement and processing of radioactive waste packages through the CRWMS and the interaction of these packages with the equipment in the various facilities. The major features of the System Simulation Model are: the ability to reference characteristics of the different types of radioactive waste (age, burnup, etc.) in order to make operational and/or system design decisions, the ability to place stochastic variations on operational parameters such as processing time and equipment outages, and the ability to include a rigorous simulation of the transportation system. Output from the model includes the numbers, types, and characteristics of waste packages at selected points in the CRWMS and the extent to which various resources will be utilized in order to transport, process, and emplace the waste

  16. The Factors of Forming the National HR-Management Model

    Directory of Open Access Journals (Sweden)

    Elena P. Kostenko

    2017-12-01

    Full Text Available There are some factors considered in this article, which influence the forming of national HR-management model. The group-forming criterion is the nature of factors, that determine the system of HR-management as a system of corporate culture values, norms and rules of organizational behavior, ways of realization some important managing functions and dominating approaches to make decisions. This article shows that the plurality of combinations in different factors leads to forming the unique HR-management model. The geoclimatic factor influences the principles of the labor organization (orientation primarily on individual or collective forms of labor, attitude to the management experience of other countries, attitude to resources, etc., the distribution of labor resources, the level of labor mobility, and the psychosocial type of employee. Models of man's labor behavior are constituted In the process of historical development. Attention is focused on the formation of a national HR-model, such as the conducted socio-economic policy, the characteristics of the institutional environment, economic goals and priorities of the country's development, the level of development and the nature of the national productive forces and economic structures. Much attention was paid to the analysis of the historically formed value system and labor traditions, which influence the approaches to HR-management. As far as religion influences the model of person’s inclusion in labor, motives of labor behavior, management culture of a certain employee, preferred payment etc., we examined how the main traditional religions (Christianity, Islam, Judaism, Buddhism, Confucianism, Hinduism influence the HR-management system in different countries.

  17. Using a Content Management System for Integrated Water Quantity, Quality and Instream Flows Modeling

    Science.gov (United States)

    Burgholzer, R.; Brogan, C. O.; Scott, D.; Keys, T.

    2017-12-01

    With increased population and water demand, in-stream flows can become depleted by consumptive uses and dilution of permitted discharges may be compromised. Reduced flows downstream of water withdrawals may increase the violation rate of bacterial concentrations from direct deposition by livestock and wildlife. Water storage reservoirs are constructed and operated to insure more stable supplies for consumptive demands and dilution flows, however their use comes at the cost of increased evaporative losses, potential for thermal pollution, interrupted fish migration, and reduced flooding events that are critical to maintain habitat and water quality. Due to this complex interrelationship between water quantity, quality and instream habitat comprehensive multi-disciplinary models must be developed to insure long-term sustainability of water resources and to avoid conflicts between drinking water, food and energy production, and aquatic biota. The Commonwealth of Virginia funded the expansion of the Chesapeake Bay Program Phase 5 model to cover the entire state, and has been using this model to evaluate water supply permit and planning since 2009. This integrated modeling system combines a content management system (Drupal and PHP) for model input data and leverages the modularity of HSPF with the custom segmentation and parameterization routines programmed by modelers working with the Chesapeake Bay Program. The model has been applied to over 30 Virginia Water Permits, instream flows and aquatic habitat models and a Virginias 30 year water supply demand projections. Future versions will leverage the Bay Model auto-calibration routines for adding small-scale water supply and TMDL models, utilize climate change scenarios, and integrate Virginia's reservoir management modules into the Chesapeake Bay watershed model, feeding projected demand and operational changes back up to EPA models to improve the realism of future Bay-wide simulations.

  18. Incident Management in Academic Information System using ITIL Framework

    Science.gov (United States)

    Palilingan, V. R.; Batmetan, J. R.

    2018-02-01

    Incident management is very important in order to ensure the continuity of a system. Information systems require incident management to ensure information systems can provide maximum service according to the service provided. Many of the problems that arise in academic information systems come from incidents that are not properly handled. The objective of this study aims to find the appropriate way of incident management. The incident can be managed so it will not be a big problem. This research uses the ITIL framework to solve incident problems. The technique used in this study is a technique adopted and developed from the service operations section of the ITIL framework. The results of this research found that 84.5% of incidents appearing in academic information systems can be handled quickly and appropriately. 15.5% incidents can be escalated so as to not cause any new problems. The model of incident management applied to make academic information system can run quickly in providing academic service in a good and efficient. The incident management model implemented in this research is able to manage resources appropriately so as to quickly and easily manage incidents.

  19. Model for deployment of a Quality Assurance System in the nuclear fuel cycle facilities using Project Management techniques

    International Nuclear Information System (INIS)

    Lage, Ricardo F.; Ribeiro, Saulo F.Q.

    2015-01-01

    The Nuclear Safety is the main goal in any nuclear facility. In this sense the Norm CNEN-NN-1.16 classifies the quality assurance issue as a management system to be deployed and implemented by the organization to achieving security goals. Quality Assurance is a set of systematic and planned actions necessary to provide adequate confidence ensuring that a structure, system, component or installation will work satisfactorily in s. Hence, the Quality Assurance System (QAS) is a complete and comprehensive methodology, going far beyond a management plan quality from the perspective of project management. The fundamental of QAS requirements is all activities that influence the quality, involving organizational, human resources, procurement, nuclear safety, projects, procedures and communication. Coordination of all these elements requires a great effort by the team responsible because it usually involves different areas and different levels of hierarchy within the organization. The objectives and desired benefits should be well set for everyone to understand what it means to be achieved and how to achieve. The support of senior management is critical at this stage, providing guidelines and resources necessary to get the job elapse clearly and efficiently, on time, cost and certain scope. The methodology of project management processes can be applied to facilitate and expedite the implementation of this system. Many of the principles of the QAS are correlated with knowledge areas of project management. The proposed model for implementation of a QAS in the nuclear fuel cycle facilities considered the best project management practices according to the Project Management Book of Knowledge (PMBOK - 5th edition) of the Project Management Institute (PMI). This knowledge is considered very good practices around the world. Since the model was defined, the deployment process becomes more practical and efficient, providing reduction in deployment time, better management of human

  20. Model for deployment of a Quality Assurance System in the nuclear fuel cycle facilities using Project Management techniques

    Energy Technology Data Exchange (ETDEWEB)

    Lage, Ricardo F.; Ribeiro, Saulo F.Q., E-mail: rflage@gmail.com, E-mail: quintao.saulo@gmail.com [Industrias Nucleares do Brasil (INB), Rio de Janeiro, RJ (Brazil)

    2015-07-01

    The Nuclear Safety is the main goal in any nuclear facility. In this sense the Norm CNEN-NN-1.16 classifies the quality assurance issue as a management system to be deployed and implemented by the organization to achieving security goals. Quality Assurance is a set of systematic and planned actions necessary to provide adequate confidence ensuring that a structure, system, component or installation will work satisfactorily in s. Hence, the Quality Assurance System (QAS) is a complete and comprehensive methodology, going far beyond a management plan quality from the perspective of project management. The fundamental of QAS requirements is all activities that influence the quality, involving organizational, human resources, procurement, nuclear safety, projects, procedures and communication. Coordination of all these elements requires a great effort by the team responsible because it usually involves different areas and different levels of hierarchy within the organization. The objectives and desired benefits should be well set for everyone to understand what it means to be achieved and how to achieve. The support of senior management is critical at this stage, providing guidelines and resources necessary to get the job elapse clearly and efficiently, on time, cost and certain scope. The methodology of project management processes can be applied to facilitate and expedite the implementation of this system. Many of the principles of the QAS are correlated with knowledge areas of project management. The proposed model for implementation of a QAS in the nuclear fuel cycle facilities considered the best project management practices according to the Project Management Book of Knowledge (PMBOK - 5th edition) of the Project Management Institute (PMI). This knowledge is considered very good practices around the world. Since the model was defined, the deployment process becomes more practical and efficient, providing reduction in deployment time, better management of human

  1. SYSTEM DYNAMICS OF MANAGEMENT OF "UNFORESEEN CIRCUMSTANCES" OF THE PROJECT

    Directory of Open Access Journals (Sweden)

    Богдан Владимирович ГАЙДАБРУС

    2015-05-01

    Full Text Available Approaches for project contingency management through risk management and influence of stakeholders. Proposed system dynamic contingency project management model. The model describes the effects of various factors on the phase of project management through contingency.

  2. Some aspects of technical models within bridge management system

    Directory of Open Access Journals (Sweden)

    Grković Slobodan

    2015-01-01

    Full Text Available Bridge Management System (BMS represents a rational and systematic approach to organizing and conducting of all activities related to bridge maintenance. Main goal of BMS is helping the bridge owner to make an optimal decision with respect to bridge maintenance budget, whether it is dedicated to one bridge or to group of bridges, by securing that the decision is made on the basis of Life-Cycle Cost (LCC estimates. The structure of BMS is based on condition rating and Bridge Database (BD, Deterioration model (DM, Cost Model for evaluation of costs and Optimization Model for choosing the most rational maintenance strategy. Relationship between bridge condition rating and DM with maintenance costs within BMS is very important. Predictions regarding future intensity and rate of bridge deterioration depends on multitude of factors and it is a consequence of several simultaneous actions and deterioration processes (DP which need to be included into DMs. DMs are mostly based on modeling of physical and chemical actions and processes or they are based on statistical analysis of large number of data regarding the condition of existing bridges, or on artificial intelligence models, etc. Stochastic models based on Markov processes are applied within more advanced contemporary BMS. Due to social and economic circumstances and lack of financial resources over the last two decades in Republic of Serbia bridge maintenance was neglected and creation of BD was discontinued. The paper deliberates some aspects of technical models within BMS, with DMs being pointed out, development of BD within bridge maintenance in Republic of Serbia and it gives an overview of sophisticated BMS and current advances in this field.

  3. Business School's Performance Management System Standards Design

    Science.gov (United States)

    Azis, Anton Mulyono; Simatupang, Togar M.; Wibisono, Dermawan; Basri, Mursyid Hasan

    2014-01-01

    This paper aims to compare various Performance Management Systems (PMS) for business school in order to find the strengths of each standard as inputs to design new model of PMS. There are many critical aspects and gaps notified for new model to improve performance and even recognized that self evaluation performance management is not well…

  4. A PC-based discrete event simulation model of the Civilian Radioactive Waste Management System

    International Nuclear Information System (INIS)

    Airth, G.L.; Joy, D.S.; Nehls, J.W.

    1991-01-01

    A System Simulation Model has been developed for the Department of Energy to simulate the movement of individual waste packages (spent fuel assemblies and fuel containers) through the Civilian Radioactive Waste Management System (CRWMS). A discrete event simulation language, GPSS/PC, which runs on an IBM/PC and operates under DOS 5.0, mathematically represents the movement and processing of radioactive waste packages through the CRWMS and the interaction of these packages with the equipment in the various facilities. This model can be used to quantify the impacts of different operating schedules, operational rules, system configurations, and equipment reliability and availability considerations on the performance of processes comprising the CRWMS and how these factors combine to determine overall system performance for the purpose of making system design decisions. The major features of the System Simulation Model are: the ability to reference characteristics of the different types of radioactive waste (age, burnup, etc.) in order to make operational and/or system design decisions, the ability to place stochastic variations on operational parameters such as processing time and equipment outages, and the ability to include a rigorous simulation of the transportation system. Output from the model includes the numbers, types, and characteristics of waste packages at selected points in the CRWMS and the extent to which various resources will be utilized in order to transport, process, and emplace the waste

  5. Design and Implementation of an ASON Management System

    Institute of Scientific and Technical Information of China (English)

    2003-01-01

    According to current management requirements, an ASON management information model and system architecture using CORBA and Java are proposed. A test platform is implemented to demonstrate multi-domain, connection and control plane management.

  6. Implementation of a demand elasticity model in the building energy management system

    NARCIS (Netherlands)

    Ożadowicz, A.; Grela, J.; Babar, M.

    2016-01-01

    Nowadays, crucial part of modern Building Automation and Control Systems (BACS) is electric energy management. An active demand side management is very important feature of a Building Energy Management Systems (BEMS) integrated within the BACS. Since demand value changes in time and depends on

  7. Design of a management information system for the Shielding Experimental Reactor ageing management

    International Nuclear Information System (INIS)

    He Jie; Xu Xianhong

    2010-01-01

    The problem of nuclear reactor ageing is a topic of increasing importance in nuclear safety recent years. Ageing management is usually implemented for reactors maintenance. In the practice, a large number of data and records need to be processed. However, there are few professional software applications that aid reactor ageing management, especially for research reactors. This paper introduces the design of a new web-based management information system (MIS), named the Shielding Experimental Reactor Ageing Management Information System (SERAMIS). It is an auxiliary means that helps to collect data, keep records, and retrieve information for a research reactor ageing management. The Java2 Enterprise Edition (J2EE) and network database techniques, such as three-tiered model, Model-View-Controller architecture, transaction-oriented operations, and JavaScript techniques, are used in the development of this system. The functionalities of the application cover periodic safety review (PSR), regulatory references, data inspection, and SSCs classification according to ageing management methodology. Data and examples are presented to demonstrate the functionalities. For future work, techniques of data mining will be employed to support decision-making.

  8. Design of a management information system for the Shielding Experimental Reactor ageing management

    Energy Technology Data Exchange (ETDEWEB)

    He Jie, E-mail: hejiejoe@163.co [Institute of Nuclear and New Energy Technology, Tsinghua University, Beijing 100084 (China); Xu Xianhong [Institute of Nuclear and New Energy Technology, Tsinghua University, Beijing 100084 (China)

    2010-01-15

    The problem of nuclear reactor ageing is a topic of increasing importance in nuclear safety recent years. Ageing management is usually implemented for reactors maintenance. In the practice, a large number of data and records need to be processed. However, there are few professional software applications that aid reactor ageing management, especially for research reactors. This paper introduces the design of a new web-based management information system (MIS), named the Shielding Experimental Reactor Ageing Management Information System (SERAMIS). It is an auxiliary means that helps to collect data, keep records, and retrieve information for a research reactor ageing management. The Java2 Enterprise Edition (J2EE) and network database techniques, such as three-tiered model, Model-View-Controller architecture, transaction-oriented operations, and JavaScript techniques, are used in the development of this system. The functionalities of the application cover periodic safety review (PSR), regulatory references, data inspection, and SSCs classification according to ageing management methodology. Data and examples are presented to demonstrate the functionalities. For future work, techniques of data mining will be employed to support decision-making.

  9. A model to capture and manage tacit knowledge using a multiagent system

    Science.gov (United States)

    Paolino, Lilyam; Paggi, Horacio; Alonso, Fernando; López, Genoveva

    2014-10-01

    This article presents a model to capture and register business tacit knowledge belonging to different sources, using an expert multiagent system which enables the entry of incidences and captures the tacit knowledge which could fix them. This knowledge and their sources are evaluated through the application of trustworthy algorithms that lead to the registration of the data base and the best of each of them. Through its intelligent software agents, this system interacts with the administrator, users, with the knowledge sources and with all the practice communities which might exist in the business world. The sources as well as the knowledge are constantly evaluated, before being registered and also after that, in order to decide the staying or modification of its original weighting. If there is the possibility of better, new knowledge are registered through the old ones. This is also part of an investigation being carried out which refers to knowledge management methodologies in order to manage tacit business knowledge so as to make the business competitiveness easier and leading to innovation learning.

  10. Interconnecting heterogeneous database management systems

    Science.gov (United States)

    Gligor, V. D.; Luckenbaugh, G. L.

    1984-01-01

    It is pointed out that there is still a great need for the development of improved communication between remote, heterogeneous database management systems (DBMS). Problems regarding the effective communication between distributed DBMSs are primarily related to significant differences between local data managers, local data models and representations, and local transaction managers. A system of interconnected DBMSs which exhibit such differences is called a network of distributed, heterogeneous DBMSs. In order to achieve effective interconnection of remote, heterogeneous DBMSs, the users must have uniform, integrated access to the different DBMs. The present investigation is mainly concerned with an analysis of the existing approaches to interconnecting heterogeneous DBMSs, taking into account four experimental DBMS projects.

  11. Intelligent Materials Tracking System for Construction Projects Management

    Directory of Open Access Journals (Sweden)

    Narimah Kasim

    2015-05-01

    Full Text Available An essential factor adversely affecting the performance of construction projects is the improper handling of materials during site activities. In addition, paper-based reports are mostly used to record and exchange information related to the material components within the supply chain, which is problematic and inefficient. Generally, technologies (such as wireless systems and RFID are not being adequately used to overcome human errors and are not well integrated with project management systems to make tracking and management of materials easier and faster. Findings from a literature review and surveys showed that there is a lack of positive examples of such tools having been used effectively. Therefore, this research focused on the development of a materials tracking system that integrates RFID-based materials management with resources modelling to improve on-site materials tracking. Rapid prototyping was used to develop the system and testing of the system was carried out to examine the functionality and working appropriately. The proposed system is intended to promote the employment of RFID for automatic materials tracking with integration of resource modelling (Microsoft (R Office Project in the project management system in order to establish which of the tagged components are required resources for certain project tasks. In conclusion, the system provides an automatic and easy tracking method for managing materials during materials delivery and inventory management processes in construction projects.

  12. Advances in battery manufacturing, service, and management systems

    CERN Document Server

    Zhou, Shiyu; Han, Yehui

    2016-01-01

    This book brings together experts in the field to highlight the cutting edge research advances in BM2S2 and to promote an innovative integrated research framework responding to the challenges. There are three major parts included in this book: manufacturing, service, and management. The first part focuses on battery manufacturing systems, including modeling, analysis, design and control, as well as economic and risk analyses. The second part focuses on information technology’s impact on service systems, such as data-driven reliability modeling, failure prognosis, and service decision making methodologies for battery services. The third part addresses battery management systems (BMS) for control and optimization of battery cells, opera ions, and hybrid storage systems to ensure overall performance and safety, as well as EV management.

  13. Business process management demystified : a tutorial on models, systems and standards for workflow management

    NARCIS (Netherlands)

    Aalst, van der W.M.P.; Desel, J.; Reisig, W.; Rozenberg, G.

    2004-01-01

    Over the last decade there has been a shift from data-aware information systems to process-aware information systems. To support business processes an enterprise information system needs to be aware of these processes and their organizational context. Business Process Management (BPM) includes

  14. Environmental Management System

    Science.gov (United States)

    Goals Recycling Green Purchasing Pollution Prevention Reusing Water Resources Environmental Management Stewardship » Environmental Protection » Environmental Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the

  15. Modeling Supermarket Refrigeration Systems for Demand-Side Management

    DEFF Research Database (Denmark)

    Shafiei, Seyed Ehsan; Rasmussen, Henrik; Stoustrup, Jakob

    2013-01-01

    Modeling of supermarket refrigeration systems for supervisory control in the smart grid is presented in this paper. A modular modeling approach is proposed in which each module is modeled and identified separately. The focus of the work is on estimating the power consumption of the system while...

  16. Systems analysis study for waste management criteria

    International Nuclear Information System (INIS)

    Heckman, R.A.; Johnson, W.A.; Holdsworth, T.

    1978-01-01

    LLL is providing technical support to the U.S. NRC in the development of standards for the management and disposal of high-level and transuranic wastes. The problem logically splits into two phases: the pre-emplacement phase of the waste management system and the repository post-sealing phase. Using a system analysis approach, we have structured our modeling effort in such a way as to produce societal risk evaluations at stated confidence levels so that the NRC can develop regulations for the broadest set of conditions possible. We are using a multicycle approach in developing the societal risk evaluations. The modeling effort uses a three level concept. At the first level, simple models are developed for first principles of chemistry and physics. These initial models use lumped parameters to provide insight into important processes. The second level modeling effort is designed to provide a flexible, fast running system analysis model. The third level of modeling provides a method for validating the second level models inputting numerical data and development of algorithms for use in the second level models

  17. Management of Control System Information SecurityI: Control System Patch Management

    Energy Technology Data Exchange (ETDEWEB)

    Quanyan Zhu; Miles McQueen; Craig Rieger; Tamer Basar

    2011-09-01

    The use of information technologies in control systems poses additional potential threats due to the frequent disclosure of software vulnerabilities. The management of information security involves a series of policy-making on the vulnerability discovery, disclosure, patch development and patching. In this paper, we use a system approach to devise a model to understand the interdependencies of these decision processes. In more details, we establish a theoretical framework for making patching decision for control systems, taking into account the requirement of functionability of control systems. We illustrate our results with numerical simulations and show that the optimal operation period of control systems given the currently estimated attack rate is roughly around a half a month.

  18. A Behavioral Model of Managerial Perspectives Regarding Technology Acceptance in Building Energy Management Systems

    Directory of Open Access Journals (Sweden)

    Jacky Chin

    2016-07-01

    Full Text Available The Building Energy Management System (BEMS, a well-known system that has been implemented in some energy corporations, has become attractive to many companies seeking to better monitor their energy consumption efficiency. This study investigated the external factors that influence acceptance of the BEMS from managerial perspectives. An extended model based on the Technology Acceptance Model (TAM was created to evaluate the implementation of the BEMS in the manufacturing industries. A structural equation modeling (SEM approach was used to analyze the model by adopting compatibility, features, technology complexity, and perceived risk as the external variables, and integrating the five dimensions of perceived ease of use, perceived usefulness, attitude, user satisfaction, and behavioral intention. The analysis results indicated that the external factors positively influenced users’ behavioral intention to use the BEMS through expected satisfaction, perceived ease of use, and perceived usefulness. Suggestions for BEMS developers are provided as well.

  19. System of Budget Planning, Programming, Development and Execution and the Defence Resources Management Model (DRMM

    Directory of Open Access Journals (Sweden)

    Davor Čutić

    2010-07-01

    Full Text Available The system of budget planning, programming, development and execution of the Ministry of Defence of the Republic of Croatia (henceforth: the Croatian acronym SPPIIP is the basic system for the strategic management of defence resources through which an effective and rational distribution of available resources is conducted, based on the goals of national security of the Republic of Croatia. This system sets the principles of transparency and democratic management of defence resources while respecting the specificities of the defence system. The SPPIIP allows for decision making based on complete information about alternatives and the choice of the most economical and most efficient way to reach the goal. It unites the strategic plan, program and budget. It consists of four continuous, independent and interconnected phases: planning, programming, development and the execution of the budget. The processes of the phases are dynamic and cyclic. In addition to the SPPIIP, the Defence Resources Management Model (DRMM, Croatian acronym: MURO has also been developed. This is an analytic tool which serves as a decision support system in the SPPIIP. The DRMM is a complex computer model showing graph and tabular overviews in a multi-year period. The model examines three areas: the strength of the forces, expenses and defence programs. The purpose of the model is cost and strength analysis and the analysis of compromise and feasibility, i.e. how sensitive the programs are to fiscal movements in the sphere of the MoD budget in the course of a multiyear cycle, until a certain project ends. The analysis results are an easily understandable basis for decision making. The SPPIIP and the DRMM are mutually independent systems, but they complement each other well. The SPPIIP uses the DRMM in designing and resource allocation based on the goals set. The quality of the DRMM depends on the amount and quality of data in its database. The DRMM can be used as a basis for

  20. Research of Manufacture Time Management System Based on PLM

    Science.gov (United States)

    Jing, Ni; Juan, Zhu; Liangwei, Zhong

    This system is targeted by enterprises manufacturing machine shop, analyzes their business needs and builds the plant management information system of Manufacture time and Manufacture time information management. for manufacturing process Combined with WEB technology, based on EXCEL VBA development of methods, constructs a hybrid model based on PLM workshop Manufacture time management information system framework, discusses the functionality of the system architecture, database structure.

  1. A risk assessment model based on fuzzy logic for electricity distribution system asset management

    Directory of Open Access Journals (Sweden)

    Alireza Yazdani

    2014-06-01

    Full Text Available Electricity distribution systems are considered as the most critical sectors in countries because of the essentiality of power supplement security, socioeconomic security, and way of life. According to the central role of electricity distribution systems, risk analysis helps decision maker determine the most serious risk items to allocate the optimal amount of resources and time. Probability-impact (PI matrix is one of the most popular methods for assessment of the risks involved in the system. However, the traditional PI matrix is criticized for its inability to take into account the inherent uncertainty imposed by real-world systems. On the other hand, fuzzy sets are capable of handling the uncertainty. Thus, in this paper, fuzzy risk assessment model is developed in order to assess risk and management for electricity distribution system asset protection. Finally, a comparison analysis is conducted to show the effectiveness and the capability of the new risk assessment model.

  2. Systemic design methodologies for electrical energy systems analysis, synthesis and management

    CERN Document Server

    Roboam, Xavier

    2012-01-01

    This book proposes systemic design methodologies applied to electrical energy systems, in particular analysis and system management, modeling and sizing tools. It includes 8 chapters: after an introduction to the systemic approach (history, basics & fundamental issues, index terms) for designing energy systems, this book presents two different graphical formalisms especially dedicated to multidisciplinary devices modeling, synthesis and analysis: Bond Graph and COG/EMR. Other systemic analysis approaches for quality and stability of systems, as well as for safety and robustness analysis tools are also proposed. One chapter is dedicated to energy management and another is focused on Monte Carlo algorithms for electrical systems and networks sizing. The aim of this book is to summarize design methodologies based in particular on a systemic viewpoint, by considering the system as a whole. These methods and tools are proposed by the most important French research laboratories, which have many scientific partn...

  3. Interface Management for a NASA Flight Project Using Model-Based Systems Engineering (MBSE)

    Science.gov (United States)

    Vipavetz, Kevin; Shull, Thomas A.; Infeld, Samatha; Price, Jim

    2016-01-01

    The goal of interface management is to identify, define, control, and verify interfaces; ensure compatibility; provide an efficient system development; be on time and within budget; while meeting stakeholder requirements. This paper will present a successful seven-step approach to interface management used in several NASA flight projects. The seven-step approach using Model Based Systems Engineering will be illustrated by interface examples from the Materials International Space Station Experiment-X (MISSE-X) project. The MISSE-X was being developed as an International Space Station (ISS) external platform for space environmental studies, designed to advance the technology readiness of materials and devices critical for future space exploration. Emphasis will be given to best practices covering key areas such as interface definition, writing good interface requirements, utilizing interface working groups, developing and controlling interface documents, handling interface agreements, the use of shadow documents, the importance of interface requirement ownership, interface verification, and product transition.

  4. Dynamic information architecture system (DIAS) : multiple model simulation management.

    Energy Technology Data Exchange (ETDEWEB)

    Simunich, K. L.; Sydelko, P.; Dolph, J.; Christiansen, J.

    2002-05-13

    Dynamic Information Architecture System (DIAS) is a flexible, extensible, object-based framework for developing and maintaining complex multidisciplinary simulations of a wide variety of application contexts. The modeling domain of a specific DIAS-based simulation is determined by (1) software Entity (domain-specific) objects that represent the real-world entities that comprise the problem space (atmosphere, watershed, human), and (2) simulation models and other data processing applications that express the dynamic behaviors of the domain entities. In DIAS, models communicate only with Entity objects, never with each other. Each Entity object has a number of Parameter and Aspect (of behavior) objects associated with it. The Parameter objects contain the state properties of the Entity object. The Aspect objects represent the behaviors of the Entity object and how it interacts with other objects. DIAS extends the ''Object'' paradigm by abstraction of the object's dynamic behaviors, separating the ''WHAT'' from the ''HOW.'' DIAS object class definitions contain an abstract description of the various aspects of the object's behavior (the WHAT), but no implementation details (the HOW). Separate DIAS models/applications carry the implementation of object behaviors (the HOW). Any model deemed appropriate, including existing legacy-type models written in other languages, can drive entity object behavior. The DIAS design promotes plug-and-play of alternative models, with minimal recoding of existing applications. The DIAS Context Builder object builds a constructs or scenario for the simulation, based on developer specification and user inputs. Because DIAS is a discrete event simulation system, there is a Simulation Manager object with which all events are processed. Any class that registers to receive events must implement an event handler (method) to process the event during execution. Event handlers

  5. Intellectual Model-Based Configuration Management Conception

    Directory of Open Access Journals (Sweden)

    Bartusevics Arturs

    2014-07-01

    Full Text Available Software configuration management is one of the most important disciplines within the software development project, which helps control the software evolution process and allows including into the end project only tested and validated changes. To achieve this, software management completes certain tasks. Concrete tools are used for technical implementation of tasks, such as version control systems, servers of continuous integration, compilers, etc. A correct configuration management process usually requires several tools, which mutually exchange information by generating various kinds of transfers. When it comes to introducing the configuration management process, often there are situations when tool installation is started, yet at that given moment there is no general picture of the total process. The article offers a model-based configuration management concept, which foresees the development of an abstract model for the configuration management process that later is transformed to lower abstraction level models and tools are indicated to support the technical process. A solution of this kind allows a more rational introduction and configuration of tools

  6. Risk Level Based Management System: a control banding model for occupational health and safety risk management in a highly regulated environment

    Energy Technology Data Exchange (ETDEWEB)

    Zalk, D; Kamerzell, R; Paik, S; Kapp, J; Harrington, D; Swuste, P

    2009-05-27

    The Risk Level Based Management System (RLBMS) is an occupational risk management (ORM) model that focuses occupational safety, hygeiene, and health (OSHH) resources on the highest risk procedures at work. This article demonstrates the model's simplicity through an implementation within a heavily regulated research institution. The model utilizes control banding strategies with a stratification of four risk levels (RLs) for many commonly performed maintenance and support activities, characterizing risk consistently for comparable tasks. RLBMS creates an auditable tracking of activities, maximizes OSHH professional field time, and standardizes documentation and control commensurate to a given task's RL. Validation of RLs and their exposure control effectiveness is collected in a traditional quantitative collection regime for regulatory auditing. However, qualitative risk assessment methods are also used within this validation process. Participatory approaches are used throughout the RLBMS process. Workers are involved in all phases of building, maintaining, and improving this model. This work participation also improves the implementation of established controls.

  7. On inclusion of water resource management in Earth system models - Part 1: Problem definition and representation of water demand

    Science.gov (United States)

    Nazemi, A.; Wheater, H. S.

    2015-01-01

    Human activities have caused various changes to the Earth system, and hence the interconnections between human activities and the Earth system should be recognized and reflected in models that simulate Earth system processes. One key anthropogenic activity is water resource management, which determines the dynamics of human-water interactions in time and space and controls human livelihoods and economy, including energy and food production. There are immediate needs to include water resource management in Earth system models. First, the extent of human water requirements is increasing rapidly at the global scale and it is crucial to analyze the possible imbalance between water demands and supply under various scenarios of climate change and across various temporal and spatial scales. Second, recent observations show that human-water interactions, manifested through water resource management, can substantially alter the terrestrial water cycle, affect land-atmospheric feedbacks and may further interact with climate and contribute to sea-level change. Due to the importance of water resource management in determining the future of the global water and climate cycles, the World Climate Research Program's Global Energy and Water Exchanges project (WRCP-GEWEX) has recently identified gaps in describing human-water interactions as one of the grand challenges in Earth system modeling (GEWEX, 2012). Here, we divide water resource management into two interdependent elements, related firstly to water demand and secondly to water supply and allocation. In this paper, we survey the current literature on how various components of water demand have been included in large-scale models, in particular land surface and global hydrological models. Issues of water supply and allocation are addressed in a companion paper. The available algorithms to represent the dominant demands are classified based on the demand type, mode of simulation and underlying modeling assumptions. We discuss

  8. A Model-Driven Approach to e-Course Management

    Science.gov (United States)

    Savic, Goran; Segedinac, Milan; Milenkovic, Dušica; Hrin, Tamara; Segedinac, Mirjana

    2018-01-01

    This paper presents research on using a model-driven approach to the development and management of electronic courses. We propose a course management system which stores a course model represented as distinct machine-readable components containing domain knowledge of different course aspects. Based on this formally defined platform-independent…

  9. Environmental Management Model for Road Maintenance Operation Involving Community Participation

    Science.gov (United States)

    Triyono, A. R. H.; Setyawan, A.; Sobriyah; Setiono, P.

    2017-07-01

    Public expectations of Central Java, which is very high on demand fulfillment, especially road infrastructure as outlined in the number of complaints and community expectations tweeter, Short Mail Massage (SMS), e-mail and public reports from various media, Highways Department of Central Java province requires development model of environmental management in the implementation of a routine way by involving the community in order to fulfill the conditions of a representative, may serve road users safely and comfortably. This study used survey method with SEM analysis and SWOT with Latent Independent Variable (X), namely; Public Participation in the regulation, development, construction and supervision of road (PSM); Public behavior in the utilization of the road (PMJ) Provincial Road Service (PJP); Safety in the Provincial Road (KJP); Integrated Management System (SMT) and latent dependent variable (Y) routine maintenance of the provincial road that is integrated with the environmental management system and involve the participation of the community (MML). The result showed the implementation of routine maintenance of road conditions in Central Java province has yet to implement an environmental management by involving the community; Therefore developed environmental management model with the results of H1: Community Participation (PSM) has positive influence on the Model of Environmental Management (MML); H2: Behavior Society in Jalan Utilization (PMJ) positive effect on Model Environmental Management (MML); H3: Provincial Road Service (PJP) positive effect on Model Environmental Management (MML); H4: Safety in the Provincial Road (KJP) positive effect on Model Environmental Management (MML); H5: Integrated Management System (SMT) has positive influence on the Model of Environmental Management (MML). From the analysis obtained formulation model describing the relationship / influence of the independent variables PSM, PMJ, PJP, KJP, and SMT on the dependent variable

  10. Suggestion of a Management Model: Total Entropy Management

    OpenAIRE

    Goksel Alpan,; Ismail Efil

    2011-01-01

    “Entropy” can be defined as the measure of disorder, uncertainty and consumed energy in a system or in the Universe. In the study, entropy concept is used as metaphor and it is aimed to construct the conceptual basis of a new management model which can be utilized to manage all entropy sources effectively. The study is conveyed with a multidisciplinary and holistic approach and by the use of qualitative research techniques. In the study, it is examined the relations of the entropy concept wit...

  11. Knowledge Model: Project Knowledge Management

    DEFF Research Database (Denmark)

    Durao, Frederico; Dolog, Peter; Grolin, Daniel

    2009-01-01

    The Knowledge model for project management serves several goals:Introducing relevant concepts of project management area for software development (Section 1). Reviewing and understanding the real case requirements from the industrial perspective. (Section 2). Giving some preliminary suggestions...... for usage in KIWI system (Sections 3). This document is intended for technological partners to understand how for example the software development concepts can be applied to a semantic wiki framework....

  12. A systems engineering cost analysis capability for use in assessing nuclear waste management system cost performance

    International Nuclear Information System (INIS)

    Shay, M.R.

    1990-04-01

    The System Engineering Cost Analysis (SECA) capability has been developed by the System Integration Branch of the US Department of Energy's Office of Civilian Radioactive Waste Management for use in assessing the cost performance of alternative waste management system configurations. The SECA capability is designed to provide rapid cost estimates of the waste management system for a given operational scenario and to permit aggregate or detailed cost comparisons for alternative waste system configurations. This capability may be used as an integral part of the System Integration Modeling System (SIMS) or, with appropriate input defining a scenario, as a separate cost analysis model

  13. An Integrated Knowledge Management System

    Directory of Open Access Journals (Sweden)

    Vasile Mazilescu

    2014-11-01

    Full Text Available The aim of this paper is to present a Knowledge Management System based on Fuzzy Logic (FLKMS, a real-time expert system to meet the challenges of the dynamic environment. The main feature of our integrated shell FLKMS is that it models and integrates the temporal relationships between the dynamic of the evolution of an economic process with some fuzzy inferential methods, using a knowledge model for control, embedded within the expert system’s operational knowledge base.

  14. Waste Management facilities cost information: System Cost Model Software Quality Assurance Plan. Revision 2

    International Nuclear Information System (INIS)

    Peterson, B.L.; Lundeen, A.S.

    1996-02-01

    In May of 1994, Lockheed Idaho Technologies Company (LITCO) in Idaho Falls, Idaho and subcontractors developed the System Cost Model (SCM) application. The SCM estimates life-cycle costs of the entire US Department of Energy (DOE) complex for designing; constructing; operating; and decommissioning treatment, storage, and disposal (TSD) facilities for mixed low-level, low-level, transuranic, and mixed transuranic waste. The SCM uses parametric cost functions to estimate life-cycle costs for various treatment, storage, and disposal modules which reflect planned and existing facilities at DOE installations. In addition, SCM can model new facilities based on capacity needs over the program life cycle. The SCM also provides transportation costs for truck and rail, which include transport of contact-handled, remote-handled, and alpha (transuranic) wastes. The user can provide input data (default data is included in the SCM) including the volume and nature of waste to be managed, the time period over which the waste is to be managed, and the configuration of the waste management complex (i.e., where each installation's generated waste will be treated, stored, and disposed). Then the SCM uses parametric cost equations to estimate the costs of pre-operations (designing), construction costs, operation management, and decommissioning these waste management facilities. For the product to be effective and useful the SCM users must have a high level of confidence in the data generated by the software model. The SCM Software Quality Assurance Plan is part of the overall SCM project management effort to ensure that the SCM is maintained as a quality product and can be relied on to produce viable planning data. This document defines tasks and deliverables to ensure continued product integrity, provide increased confidence in the accuracy of the data generated, and meet the LITCO's quality standards during the software maintenance phase. 8 refs., 1 tab

  15. Waste Management facilities cost information: System Cost Model Software Quality Assurance Plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, B.L.; Lundeen, A.S.

    1996-02-01

    In May of 1994, Lockheed Idaho Technologies Company (LITCO) in Idaho Falls, Idaho and subcontractors developed the System Cost Model (SCM) application. The SCM estimates life-cycle costs of the entire US Department of Energy (DOE) complex for designing; constructing; operating; and decommissioning treatment, storage, and disposal (TSD) facilities for mixed low-level, low-level, transuranic, and mixed transuranic waste. The SCM uses parametric cost functions to estimate life-cycle costs for various treatment, storage, and disposal modules which reflect planned and existing facilities at DOE installations. In addition, SCM can model new facilities based on capacity needs over the program life cycle. The SCM also provides transportation costs for truck and rail, which include transport of contact-handled, remote-handled, and alpha (transuranic) wastes. The user can provide input data (default data is included in the SCM) including the volume and nature of waste to be managed, the time period over which the waste is to be managed, and the configuration of the waste management complex (i.e., where each installation`s generated waste will be treated, stored, and disposed). Then the SCM uses parametric cost equations to estimate the costs of pre-operations (designing), construction costs, operation management, and decommissioning these waste management facilities. For the product to be effective and useful the SCM users must have a high level of confidence in the data generated by the software model. The SCM Software Quality Assurance Plan is part of the overall SCM project management effort to ensure that the SCM is maintained as a quality product and can be relied on to produce viable planning data. This document defines tasks and deliverables to ensure continued product integrity, provide increased confidence in the accuracy of the data generated, and meet the LITCO`s quality standards during the software maintenance phase. 8 refs., 1 tab.

  16. Analysis and design on airport safety information management system

    Directory of Open Access Journals (Sweden)

    Yan Lin

    2017-01-01

    Full Text Available Airport safety information management system is the foundation of implementing safety operation, risk control, safety performance monitor, and safety management decision for the airport. The paper puts forward the architecture of airport safety information management system based on B/S model, focuses on safety information processing flow, designs the functional modules and proposes the supporting conditions for system operation. The system construction is helpful to perfecting the long effect mechanism driven by safety information, continually increasing airport safety management level and control proficiency.

  17. Modelling Management Practices in Viticulture while Considering Resource Limitations: The Dhivine Model.

    Directory of Open Access Journals (Sweden)

    Roger Martin-Clouaire

    Full Text Available Many farming-system studies have investigated the design and evaluation of crop-management practices with respect to economic performance and reduction in environmental impacts. In contrast, little research has been devoted to analysing these practices in terms of matching the recurrent context-dependent demand for resources (labour in particular with those available on the farm. This paper presents Dhivine, a simulation model of operational management of grape production at the vineyard scale. Particular attention focuses on representing a flexible plan, which organises activities temporally, the resources available to the vineyard manager and the process of scheduling and executing the activities. The model relies on a generic production-system ontology used in several agricultural production domains. The types of investigations that the model supports are briefly illustrated. The enhanced realism of the production-management situations simulated makes it possible to examine and understand properties of resource-constrained work-organisation strategies and possibilities for improving them.

  18. Integrated System Health Management Development Toolkit

    Science.gov (United States)

    Figueroa, Jorge; Smith, Harvey; Morris, Jon

    2009-01-01

    This software toolkit is designed to model complex systems for the implementation of embedded Integrated System Health Management (ISHM) capability, which focuses on determining the condition (health) of every element in a complex system (detect anomalies, diagnose causes, and predict future anomalies), and to provide data, information, and knowledge (DIaK) to control systems for safe and effective operation.

  19. Consumer Acceptance Analysis of the Home Energy Management System

    Directory of Open Access Journals (Sweden)

    Eung-Suk Park

    2017-12-01

    Full Text Available The purpose of this paper is to study consumer acceptance of the Home Energy Management System, which is the next generation electronic management system that the Korean government plans to implement in households. The Home Energy Management System is a critical device in maximizing the efficiency of electric energy consumption for each household by using a smart grid. Because it can visualize real-time price information on the electricity, households can easily monitor and control the amount of electricity consumption. With this feature, the Home Energy Management System can contribute to consumers’ total energy savings. This is a major reason why the Korean government wishes to implement it nationwide. Since the Home Energy Management System is a product that applies new technology that has not yet been directly encountered by consumers, there may be a difference in the level of public perception of the Home Energy Management System. Therefore, the impact of consumers’ awareness of the Home Energy Management System on their intention to use is important. To do this, the Technology Acceptance Model is utilized in this study. Traditional research on the Technology Acceptance Model includes awareness of usefulness and ease of use as well as intention to use. In contrast, in this research, an extended Technology Acceptance Model with four additional factors—economic benefit, social contribution, environmental responsibility, and innovativeness—that may affect the consumer’s awareness of usefulness and ease of use, is proposed. To collect the data, the survey was conducted with 287 respondents. As a result, the proposed model proved to be suitable in explaining the intention to use with a 70.3% explanation power. It is found that economic benefit (0.231 and innovativeness (0.259 impact on usefulness of the Home Energy Management System. Moreover, usefulness (0.551 has a bigger effect on intention to use than ease of use (0.338 does. Based

  20. Model medication management process in Australian nursing homes using business process modeling.

    Science.gov (United States)

    Qian, Siyu; Yu, Ping

    2013-01-01

    One of the reasons for end user avoidance or rejection to use health information systems is poor alignment of the system with healthcare workflow, likely causing by system designers' lack of thorough understanding about healthcare process. Therefore, understanding the healthcare workflow is the essential first step for the design of optimal technologies that will enable care staff to complete the intended tasks faster and better. The often use of multiple or "high risk" medicines by older people in nursing homes has the potential to increase medication error rate. To facilitate the design of information systems with most potential to improve patient safety, this study aims to understand medication management process in nursing homes using business process modeling method. The paper presents study design and preliminary findings from interviewing two registered nurses, who were team leaders in two nursing homes. Although there were subtle differences in medication management between the two homes, major medication management activities were similar. Further field observation will be conducted. Based on the data collected from observations, an as-is process model for medication management will be developed.

  1. Maintenance management systems

    International Nuclear Information System (INIS)

    Rohan, M. de

    1989-01-01

    This paper is concerned principally with Maintenance Management systems and their effective introduction into organisations. Maintenance improvement is basically a problem of managing the maintenance department in the broadest sense. Improvement does not only lie in the area of special techniques, systems or procedures; although they are valuable tools, but rather in a balanced attack, carefully guided by management. Over recent years, maintenance systems have received the major emphasis and in many instances the selection of the system has become a pre-occupation, whereas the importance of each maintenance function must be recognised and good management practices applied to all maintenance activities. The ingredients for success in the implementation of maintenance management systems are summarised as: having a management committee, clear objectives, project approach using project management techniques and an enthusiastic leader, user managed and data processing supported project, realistic budget and an understanding of the financial audit requirements. (author)

  2. Intelligent information system for waste management; Jaetehuollon aelykaes tietojaerjestelmae

    Energy Technology Data Exchange (ETDEWEB)

    Nuortio, T. [Kuopio Univ. (Finland)

    2005-07-01

    'iWaste - Intelligent Information System for Waste Management' - was a joint project of the University of Kuopio and the Tampere University of Technology. The main objective of the project was to improve the management and use of waste management data. Also the project focused on the development of information management systems. The results of the project are numerous. A study of the present state of information management in the field of waste management was carried out. The studied aspects were for example information needs of different actors and their requirements for the information quality, communication requirements among different actors, and the characteristics and applications of the software products. The conceptual data model of waste management was developed and resulted as the hyper document for connecting waste and information management specialists, and for research and educational purposes. Also, this model can be used for the development of political regulation. Methodologies and models for processing data into information for decision making were developed. The methodologies and models include e.g. data mining techniques, prediction of waste generation and optimisation of waste pick-up and transport. (orig.)

  3. Natural Aggregation Approach based Home Energy Manage System with User Satisfaction Modelling

    Science.gov (United States)

    Luo, F. J.; Ranzi, G.; Dong, Z. Y.; Murata, J.

    2017-07-01

    With the prevalence of advanced sensing and two-way communication technologies, Home Energy Management System (HEMS) has attracted lots of attentions in recent years. This paper proposes a HEMS that optimally schedules the controllable Residential Energy Resources (RERs) in a Time-of-Use (TOU) pricing and high solar power penetrated environment. The HEMS aims to minimize the overall operational cost of the home, and the user’s satisfactions and requirements on the operation of different household appliances are modelled and considered in the HEMS. Further, a new biological self-aggregation intelligence based optimization technique previously proposed by the authors, i.e., Natural Aggregation Algorithm (NAA), is applied to solve the proposed HEMS optimization model. Simulations are conducted to validate the proposed method.

  4. Bridge Management Systems

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    In this paper bridge management systems are discussed with special emphasis on management systems for reinforced concrete bridges. Management systems for prestressed concrete bridges, steel bridges, or composite bridges can be developed in a similar way....

  5. Integration of electronic document management system with other systems in a company

    OpenAIRE

    Pintar, Matej

    2016-01-01

    This master's thesis presents specific model of integration between electronic document management system and other systems in a medium-sized company in Slovenia. The introduction part of the thesis begins with theoretical basis of the research, which is the integration of computer systems. The introduction part is folowed by presentation of a concrete electronic document management system EBA DMS. Central part of the master's thesis presents different methods of integration of electronic doc...

  6. Data model management, with the use of artificial intelligence, for a geographic information system in the energetic sector

    Directory of Open Access Journals (Sweden)

    Nayi Sánchez Fleitas

    2016-09-01

    Full Text Available A Geographic Information System (GIS, named SIGOBE v 3.0, for the electric sector is development. The Integral Management System of the ECIE (SIGECIE and the Integrated Network Management System (SIGERE databases are taxed alfanumeric information. Studies determined the need for a model for data management, contributing to the GIS development, on a conceptual schema domain capable of responding to different user requests, through automatic query as support decision making. To provide the GIS with a conceptual basis an ontology is determined, which will be expressed by logical descriptive, to generate the traits of a case-based reasoning that allows automation of consultations. The final quality of GIS was verified according to the quality standards of the ISO-9126:2002 standard. The proposed model and its functionality contributes to: facilitate decision-making at different levels, perform risk analysis to have the defects of electrical installations, reduce the time of failure to the key areas of the country, organize the travel of trucks more efficiently and locate electrical faults more accurately.

  7. INTEGRATION OF ENVIRONMENTAL MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Tomescu Ada Mirela

    2012-07-01

    Full Text Available The relevance of management as significant factor of business activity can be established on various management systems. These will help to obtain, organise, administrate, evaluate and control particulars: information, quality, environmental protection, health and safety, various resources (time, human, finance, inventory etc. The complexity of nowadays days development, forced us to think ‘integrated’. Sustainable development principles require that environment management policies and practices are not good in themselves but also integrate with all other environmental objectives, and with social and economic development objectives. The principles of sustainable development involve that environment management policies and practices. These are not sound in them-self but also integrate with all other environmental objectives, and with social and economic development objectives. Those objectives were realized, and followed by development of strategies to effects the objective of sustainable development. Environmental management should embrace recent change in the area of environmental protection, and suit the recently regulations of the field -entire legal and economic, as well as perform management systems to meet the requirements of the contemporary model for economic development. These changes are trailed by abandon the conventional approach of environmental protection and it is replaced by sustainable development (SD. The keys and the aims of Cleaner Productions (CP are presented being implemented in various companies as a non-formalised environmental management system (EMS. This concept is suggested here as a proper model for practice where possible environmental harmful technologies are used -e.g. Rosia Montana. Showing the features and the power of CP this paper is a signal oriented to involve the awareness of policy-makers and top management of diverse Romanian companies. Many companies in European countries are developing

  8. Simulation modeling on the growth of firm's safety management capability

    Institute of Scientific and Technical Information of China (English)

    LIU Tie-zhong; LI Zhi-xiang

    2008-01-01

    Aiming to the deficiency of safety management measure, established simulation model about firm's safety management capability(FSMC) based on organizational learning theory. The system dynamics(SD) method was used, in which level and rate system, variable equation and system structure flow diagram was concluded. Simulation model was verified from two aspects: first, model's sensitivity to variable was tested from the gross of safety investment and the proportion of safety investment; second, variables dependency was checked up from the correlative variable of FSMC and organizational learning. The feasibility of simulation model is verified though these processes.

  9. Grey fuzzy optimization model for water quality management of a river system

    Science.gov (United States)

    Karmakar, Subhankar; Mujumdar, P. P.

    2006-07-01

    A grey fuzzy optimization model is developed for water quality management of river system to address uncertainty involved in fixing the membership functions for different goals of Pollution Control Agency (PCA) and dischargers. The present model, Grey Fuzzy Waste Load Allocation Model (GFWLAM), has the capability to incorporate the conflicting goals of PCA and dischargers in a deterministic framework. The imprecision associated with specifying the water quality criteria and fractional removal levels are modeled in a fuzzy mathematical framework. To address the imprecision in fixing the lower and upper bounds of membership functions, the membership functions themselves are treated as fuzzy in the model and the membership parameters are expressed as interval grey numbers, a closed and bounded interval with known lower and upper bounds but unknown distribution information. The model provides flexibility for PCA and dischargers to specify their aspirations independently, as the membership parameters for different membership functions, specified for different imprecise goals are interval grey numbers in place of a deterministic real number. In the final solution optimal fractional removal levels of the pollutants are obtained in the form of interval grey numbers. This enhances the flexibility and applicability in decision-making, as the decision-maker gets a range of optimal solutions for fixing the final decision scheme considering technical and economic feasibility of the pollutant treatment levels. Application of the GFWLAM is illustrated with case study of the Tunga-Bhadra river system in India.

  10. Survey of systems safety analysis methods and their application to nuclear waste management systems

    International Nuclear Information System (INIS)

    Pelto, P.J.; Winegardner, W.K.; Gallucci, R.H.V.

    1981-11-01

    This report reviews system safety analysis methods and examines their application to nuclear waste management systems. The safety analysis methods examined include expert opinion, maximum credible accident approach, design basis accidents approach, hazard indices, preliminary hazards analysis, failure modes and effects analysis, fault trees, event trees, cause-consequence diagrams, G0 methodology, Markov modeling, and a general category of consequence analysis models. Previous and ongoing studies on the safety of waste management systems are discussed along with their limitations and potential improvements. The major safety methods and waste management safety related studies are surveyed. This survey provides information on what safety methods are available, what waste management safety areas have been analyzed, and what are potential areas for future study

  11. Survey of systems safety analysis methods and their application to nuclear waste management systems

    Energy Technology Data Exchange (ETDEWEB)

    Pelto, P.J.; Winegardner, W.K.; Gallucci, R.H.V.

    1981-11-01

    This report reviews system safety analysis methods and examines their application to nuclear waste management systems. The safety analysis methods examined include expert opinion, maximum credible accident approach, design basis accidents approach, hazard indices, preliminary hazards analysis, failure modes and effects analysis, fault trees, event trees, cause-consequence diagrams, G0 methodology, Markov modeling, and a general category of consequence analysis models. Previous and ongoing studies on the safety of waste management systems are discussed along with their limitations and potential improvements. The major safety methods and waste management safety related studies are surveyed. This survey provides information on what safety methods are available, what waste management safety areas have been analyzed, and what are potential areas for future study.

  12. Maintenance and management system

    International Nuclear Information System (INIS)

    Ando, Yasumasa.

    1992-01-01

    Since highly reliable operation is required in a nuclear power plant, monitoring during operation and periodical inspection are conducted carefully. The present invention provides maintenance and management systems for providing an aid so that these systems are combined effectively and operated rationally based on unified information management. That is, the system contains data bases comprising information for the design of the equipments and pipelines of a plant, information for the exchange of equipment parts, information for the history of plant operation, information for the monitoring and inspection, and information for the management of repair operation. In addition, it has an equipment part history management sub-system for managing equipment part exchange information, an operation history management sub-system for managing the operation state of the plant, an operation history management sub-system for managing equipment monitoring inspection data and operation management sub-system for managing periodical inspection/ repairing operation. These sub-systems are collectively combined to manage the maintenance and management jobs of the plant unitarily. (I.S.)

  13. Designing a Model for Trauma System Management Using Public Health Approach: The Case of Iran

    OpenAIRE

    Farzad Panahi; Bahram Elgoshaei; Mohammad Reza Maleki; Shahram Tofighi; Seyed Abbas Motevalian; Seyed Jamaledin Tabibi; Payam Tarighi; Gholam Reza Masoomi

    2012-01-01

    Trauma is a leading cause of death and disability around the world. Injuries are responsible for about six million deaths annually, of which ninety percent occur in developing countries. In Iran, injuries are the most common cause of death among age groups below fifty. Trauma system development is a systematic and comprehensive approach to injury prevention and treatment whose effectiveness has been proved. The present study aims at designing a trauma system management model as the first step...

  14. 1993 baseline solid waste management system description

    International Nuclear Information System (INIS)

    Armacost, L.L.; Fowler, R.A.; Konynenbelt, H.S.

    1994-02-01

    Pacific Northwest Laboratory has prepared this report under the direction of Westinghouse Hanford Company. The report provides an integrated description of the system planned for managing Hanford's solid low-level waste, low-level mixed waste, transuranic waste, and transuranic mixed waste. The primary purpose of this document is to illustrate a collective view of the key functions planned at the Hanford Site to handle existing waste inventories, as well as solid wastes that will be generated in the future. By viewing this system as a whole rather than as individual projects, key facility interactions and requirements are identified and a better understanding of the overall system may be gained. The system is described so as to form a basis for modeling the system at various levels of detail. Model results provide insight into issues such as facility capacity requirements, alternative system operating strategies, and impacts of system changes (ie., startup dates). This description of the planned Hanford solid waste processing system: defines a baseline system configuration; identifies the entering waste streams to be managed within the system; identifies basic system functions and waste flows; and highlights system constraints. This system description will evolve and be revised as issues are resolved, planning decisions are made, additional data are collected, and assumptions are tested and changed. Out of necessity, this document will also be revised and updated so that a documented system description, which reflects current system planning, is always available for use by engineers and managers. It does not provide any results generated from the many alternatives that will be modeled in the course of analyzing solid waste disposal options; such results will be provided in separate documents

  15. Development of Nora Performance and Management System for Creative Economy

    OpenAIRE

    Sriaroon Ruangrit; Prajak Maicharoen; Kla Somtrakool

    2015-01-01

    This research study on “Development of Nora Performance and Management System for Creative Economy” is a qualitative research that aims to study 1) historical background, popular traditions, beliefs and management system of Nora performance; 2) problems encountered pertaining Nora performance and its management system; and 3) an appropriate model for development of Nora performance and management system for the creative economy. The target area of the research is a selection of 6 Nora perform...

  16. BALANCED SCORECARD AS AN ADVANCED MANAGEMENT CONCEPT WITHIN THE INTEGRATED QUALITY MANAGEMENT MODEL

    Directory of Open Access Journals (Sweden)

    Stevan Zivojinovic

    2008-03-01

    Full Text Available The significance of >Integratedquality management< (IQM model, originating form St.Gallen-model, is reflected in the need for synergic application of new and advanced concepts of management theory and practise. Balanced score card (BSC within IQM model becomes a catalyst of business success for a modern organization by focusing on organizational variables-business strategy, organization structure and corporate culture. BSC is the leading system of performance tracking and strategy implementation, consistent with other management concepts and methods for managing process improvement. Through BSC, IQM processes' activities correlate with organization business results. BSC management processes enable integration of all decision-making levels, from institutional via strategic to operative, in the process starting from planing, i.e. formulating and implementation of strategy, to feed back by performance measurement and control.

  17. Introducing Managers to Expert Systems.

    Science.gov (United States)

    Finlay, Paul N.; And Others

    1991-01-01

    Describes a short course to expose managers to expert systems, consisting of (1) introductory lecture; (2) supervised computer tutorial; (3) lecture and discussion about knowledge structuring and modeling; and (4) small group work on a case study using computers. (SK)

  18. Construction of maintenance management system of atomic power plant

    International Nuclear Information System (INIS)

    Shibasaki, Naofumi; Ookawara, Koumei; Suzuki, Masashi

    2005-01-01

    This maintenance management system has the retrieval function of the variation conditions with the three dimensions models and repair history. The structure of system consists of the management data retrieval tool and the total facilities repair plan support tool. The system has the management function of facilities information, a bird's-eye view of three dimensions models, data recording function, output of various kinds of registers, pre-estimation of degradation and the repair plan support function. When the total facilities repair plan support tool is selected, the variation conditions of facilities, repair history and repair cost are shown, and each part of facility and materials is able to display. (S.Y.)

  19. BUSINESS PROCESS MODELLING: A FOUNDATION FOR KNOWLEDGE MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Vesna Bosilj-Vukšić

    2006-12-01

    Full Text Available Knowledge management (KM is increasingly recognised as a strategic practice of knowledge-intensive companies, becoming an integral part of an organisation's strategy to improve business performance. This paper provides an overview of business process modelling applications and analyses the relationship between business process modelling and knowledge management projects. It presents the case study of Croatian leading banks and the insurance company, discussing its practical experience in conducting business process modelling projects and investigating the opportunity for integrating business process repository and organisational knowledge as the foundation for knowledge management system development.

  20. Multi-sources model and control algorithm of an energy management system for light electric vehicles

    International Nuclear Information System (INIS)

    Hannan, M.A.; Azidin, F.A.; Mohamed, A.

    2012-01-01

    Highlights: ► An energy management system (EMS) is developed for a scooter under normal and heavy power load conditions. ► The battery, FC, SC, EMS, DC machine and vehicle dynamics are modeled and designed for the system. ► State-based logic control algorithms provide an efficient and feasible multi-source EMS for light electric vehicles. ► Vehicle’s speed and power are closely matched with the ECE-47 driving cycle under normal and heavy load conditions. ► Sources of energy changeover occurred at 50% of the battery state of charge level in heavy load conditions. - Abstract: This paper presents the multi-sources energy models and ruled based feedback control algorithm of an energy management system (EMS) for light electric vehicle (LEV), i.e., scooters. The multiple sources of energy, such as a battery, fuel cell (FC) and super-capacitor (SC), EMS and power controller, DC machine and vehicle dynamics are designed and modeled using MATLAB/SIMULINK. The developed control strategies continuously support the EMS of the multiple sources of energy for a scooter under normal and heavy power load conditions. The performance of the proposed system is analyzed and compared with that of the ECE-47 test drive cycle in terms of vehicle speed and load power. The results show that the designed vehicle’s speed and load power closely match those of the ECE-47 test driving cycle under normal and heavy load conditions. This study’s results suggest that the proposed control algorithm provides an efficient and feasible EMS for LEV.

  1. Resource Storage Management Model For Ensuring Quality Of Service In The Cloud Archive Systems

    Directory of Open Access Journals (Sweden)

    Mariusz Kapanowski

    2014-01-01

    Full Text Available Nowadays, service providers offer a lot of IT services in the public or private cloud. The client can buy various kinds of services like SaaS, PaaS, etc. Recently there was introduced Backup as a Service (BaaS as a variety of SaaS. At the moment there are available several different BaaSes for archiving the data in the cloud, but they provide only a basic level of service quality. In the paper we propose a model which ensures QoS for BaaS and some  methods for management of storage resources aimed at achieving the required SLA. This model introduces a set of parameters responsible for SLA level which can be offered on the basic or higher level of quality. The storage systems (typically HSM, which are distributed between several Data Centres,  are built based on disk arrays, VTLs, and tape libraries. The RSMM model does not assume bandwidth reservation or control, but is rather focused on the management of storage resources.

  2. Monitoring processes and measuring the effectiveness of the management system

    International Nuclear Information System (INIS)

    Bailescu, A.; Costea, D.

    2009-01-01

    This document presents the way which the 8th principle of the quality management system 'Process approach' is applied, the principle that is identified and used by international standard ISO 9000. In order to understand the evolution of the management system requirements, as used today in different activities namely, industry, services, and nuclear activities, the authors present an evolution of the quality concept and its traceability to different standards, applicable in time. There are described the requirements of ISO 9001 standard, that represents the most widely spread model for modern organization management and the IAEA concerns related to integration of the above standard requirements into the most recent safety IAEA standard 'The Management System for facilities and activities'. The IAEA Safety Standard GS-R-3 describes a management model considering both the evolution of the quality requirements into the modern management and the recovery of the experience gained by nuclear activities. The authors pleads for applying of the 8th principle as a means and a model, easy to use to ensure the achievement of management objectives. (authors)

  3. Conceptual modular description of the high-level waste management system for system studies model development

    International Nuclear Information System (INIS)

    McKee, R.W.; Young, J.R.; Konzek, G.J.

    1992-08-01

    This document presents modular descriptions of possible alternative components of the federal high-level radioactive waste management system and the procedures for combining these modules to obtain descriptions for alternative configurations of that system. The 20 separate system component modules presented here can be combined to obtain a description of any of the 17 alternative system configurations (i.e., scenarios) that were evaluated in the MRS Systems Studies program (DOE 1989a). First-approximation descriptions of other yet-undefined system configurations could also be developed for system study purposes from this database. The descriptions include, in a modular format, both functional descriptions of the processes in the waste management system, plus physical descriptions of the equipment and facilities necessary for performance of those functions

  4. Online application of a risk management system for risk assessment and monitoring at NPPs

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Jun, E-mail: youngjun51@hotmail.com [Key Laboratory of Fundamental Science on Nuclear Safety and Simulation Technology, Harbin Engineering University (China); Yang, Ming, E-mail: yangming@hrbeu.edu.cn [Key Laboratory of Fundamental Science on Nuclear Safety and Simulation Technology, Harbin Engineering University (China); Wang, Wenlin, E-mail: wlwang0618@126.com [Key Laboratory of Fundamental Science on Nuclear Safety and Simulation Technology, Harbin Engineering University (China); Li, Fengjun, E-mail: leefengjun@163.com [China Nuclear Power Engineering Co. Ltd (China)

    2016-08-15

    Highlights: • A generic GO-FLOW modeling structure is proposed for easily Living PSA development and analysis. • Hierarchical and modularized scheme is applied in the development of Living PSA models and database. • A risk management system is developed by GO-FLOW method. • Functional testing is conducted on the risk management system for performance evaluation. • The fast solution time derived from Living PSA application is supportive in plant safety management. - Abstract: The paper presents a risk management system on the basis of Living PSA models which are developed under a proposed generic GO-FLOW modeling method with a hierarchical and modular structure. The design of the risk management system is aiming at assisting plant personnel to manage maintenance plan and system configuration, and conduct system reliability monitoring, risk monitoring and risk management quickly and conveniently through graphical user interfaces without going deep into the details of building, updating and analyzing reliability and risk models. The performance of the proposed risk management system was tested on a full-scale simulator of PWR nuclear power plant and demonstrated that the fast solution time derived from utilization of hierarchical and modularized Living PSA models is strongly supportive for instantaneous risk assessment as well as for daily risk management at NPPs.

  5. Small supermarket management system

    Institute of Scientific and Technical Information of China (English)

    曹正

    2016-01-01

    This system USES the Java language in the MyEclipse platform development tool, SQL2005 as the database platform for data and data, the SQL2005 required for the user operating system. It mainly implements the daily management of goods, including purchase management, inventory management, sales management, personnel management and supplier management. The system can also complete the functions of browsing, querying, adding, deleting and modifying relevant information. This topic is the core of the stock management, inventory management and sales management, at the same time, the system also has the full user management and permissions management function..

  6. Endangered Butterflies as a Model System for Managing Source Sink Dynamics on Department of Defense Lands

    Science.gov (United States)

    used three species of endangered butterflies as a model system to rigorously investigate the source-sink dynamics of species being managed on military...lands. Butterflies have numerous advantages as models for source-sink dynamics , including rapid generation times and relatively limited dispersal, but...they are subject to the same processes that determine source-sink dynamics of longer-lived, more vagile taxa.1.2 Technical Approach: For two of our

  7. Integrated management system laying a foundation for excellence

    Energy Technology Data Exchange (ETDEWEB)

    Brissette, S.; Vincent, D. [Bruce Power, Tiverton, Ontario (Canada)], E-mail: Derek.VINCENT@brucepower.com

    2009-07-01

    Integration in its simplest form involves seamless coordination between organizational elements such as organization structure, processes, systems and documents. This paper discusses the concept of integration in regards to managed systems and examines practical issues of marrying evolving standards to organizational design and overall governance. Bruce Power's experience in developing its Management System into a more integrated approach is described. Leadership sponsorship of an integrated programmatic approach using a Governance, Oversight, Support and Perform (GOSP) model of accountability framework within the Management System has been a critical success factor in Bruce Power's journey towards achieving operational excellence. (author)

  8. Integrated management system laying a foundation for excellence

    International Nuclear Information System (INIS)

    Brissette, S.; Vincent, D.

    2009-01-01

    Integration in its simplest form involves seamless coordination between organizational elements such as organization structure, processes, systems and documents. This paper discusses the concept of integration in regards to managed systems and examines practical issues of marrying evolving standards to organizational design and overall governance. Bruce Power's experience in developing its Management System into a more integrated approach is described. Leadership sponsorship of an integrated programmatic approach using a Governance, Oversight, Support and Perform (GOSP) model of accountability framework within the Management System has been a critical success factor in Bruce Power's journey towards achieving operational excellence. (author)

  9. Selective 4D modelling framework for spatial-temporal land information management system

    Science.gov (United States)

    Doulamis, Anastasios; Soile, Sofia; Doulamis, Nikolaos; Chrisouli, Christina; Grammalidis, Nikos; Dimitropoulos, Kosmas; Manesis, Charalambos; Potsiou, Chryssy; Ioannidis, Charalabos

    2015-06-01

    This paper introduces a predictive (selective) 4D modelling framework where only the spatial 3D differences are modelled at the forthcoming time instances, while regions of no significant spatial-temporal alterations remain intact. To accomplish this, initially spatial-temporal analysis is applied between 3D digital models captured at different time instances. So, the creation of dynamic change history maps is made. Change history maps indicate spatial probabilities of regions needed further 3D modelling at forthcoming instances. Thus, change history maps are good examples for a predictive assessment, that is, to localize surfaces within the objects where a high accuracy reconstruction process needs to be activated at the forthcoming time instances. The proposed 4D Land Information Management System (LIMS) is implemented using open interoperable standards based on the CityGML framework. CityGML allows the description of the semantic metadata information and the rights of the land resources. Visualization aspects are also supported to allow easy manipulation, interaction and representation of the 4D LIMS digital parcels and the respective semantic information. The open source 3DCityDB incorporating a PostgreSQL geo-database is used to manage and manipulate 3D data and their semantics. An application is made to detect the change through time of a 3D block of plots in an urban area of Athens, Greece. Starting with an accurate 3D model of the buildings in 1983, a change history map is created using automated dense image matching on aerial photos of 2010. For both time instances meshes are created and through their comparison the changes are detected.

  10. The architecture and prototype implementation of the Model Environment system

    Science.gov (United States)

    Donchyts, G.; Treebushny, D.; Primachenko, A.; Shlyahtun, N.; Zheleznyak, M.

    2007-01-01

    An approach that simplifies software development of the model based decision support systems for environmental management has been introduced. The approach is based on definition and management of metadata and data related to computational model without losing data semantics and proposed methods of integration of the new modules into the information system and their management. An architecture of the integrated modelling system is presented. The proposed architecture has been implemented as a prototype of integrated modelling system using. NET/Gtk{#} and is currently being used to re-design European Decision Support System for Nuclear Emergency Management RODOS (http://www.rodos.fzk.de) using Java/Swing.

  11. OPERATIONS RESEARCH IN THE DESIGN OF MANAGEMENT INFORMATION SYSTEMS

    Science.gov (United States)

    management information systems is concerned with the identification and detailed specification of the information and data processing...of advanced data processing techniques in management information systems today, the close coordination of operations research and data systems activities has become a practical necessity for the modern business firm.... information systems in which mathematical models are employed as the basis for analysis and systems design. Operations research provides a

  12. A complex systems approach to constructing better models for managing financial markets and the economy

    Science.gov (United States)

    Farmer, J. Doyne; Gallegati, M.; Hommes, C.; Kirman, A.; Ormerod, P.; Cincotti, S.; Sanchez, A.; Helbing, D.

    2012-11-01

    We outline a vision for an ambitious program to understand the economy and financial markets as a complex evolving system of coupled networks of interacting agents. This is a completely different vision from that currently used in most economic models. This view implies new challenges and opportunities for policy and managing economic crises. The dynamics of such models inherently involve sudden and sometimes dramatic changes of state. Further, the tools and approaches we use emphasize the analysis of crises rather than of calm periods. In this they respond directly to the calls of Governors Bernanke and Trichet for new approaches to macroeconomic modelling.

  13. Development of advanced spent fuel management process. System analysis of advanced spent fuel management process

    International Nuclear Information System (INIS)

    Ro, S.G.; Kang, D.S.; Seo, C.S.; Lee, H.H.; Shin, Y.J.; Park, S.W.

    1999-03-01

    The system analysis of an advanced spent fuel management process to establish a non-proliferation model for the long-term spent fuel management is performed by comparing the several dry processes, such as a salt transport process, a lithium process, the IFR process developed in America, and DDP developed in Russia. In our system analysis, the non-proliferation concept is focused on the separation factor between uranium and plutonium and decontamination factors of products in each process, and the non-proliferation model for the long-term spent fuel management has finally been introduced. (Author). 29 refs., 17 tabs., 12 figs

  14. Urban Stormwater Management Model and Tools for Designing Stormwater Management of Green Infrastructure Practices

    Science.gov (United States)

    Haris, H.; Chow, M. F.; Usman, F.; Sidek, L. M.; Roseli, Z. A.; Norlida, M. D.

    2016-03-01

    Urbanization is growing rapidly in Malaysia. Rapid urbanization has known to have several negative impacts towards hydrological cycle due to decreasing of pervious area and deterioration of water quality in stormwater runoff. One of the negative impacts of urbanization is the congestion of the stormwater drainage system and this situation leading to flash flood problem and water quality degradation. There are many urban stormwater management softwares available in the market such as Storm Water Drainage System design and analysis program (DRAINS), Urban Drainage and Sewer Model (MOUSE), InfoWorks River Simulation (InfoWork RS), Hydrological Simulation Program-Fortran (HSPF), Distributed Routing Rainfall-Runoff Model (DR3M), Storm Water Management Model (SWMM), XP Storm Water Management Model (XPSWMM), MIKE-SWMM, Quality-Quantity Simulators (QQS), Storage, Treatment, Overflow, Runoff Model (STORM), and Hydrologic Engineering Centre-Hydrologic Modelling System (HEC-HMS). In this paper, we are going to discuss briefly about several softwares and their functionality, accessibility, characteristics and components in the quantity analysis of the hydrological design software and compare it with MSMA Design Aid and Database. Green Infrastructure (GI) is one of the main topics that has widely been discussed all over the world. Every development in the urban area is related to GI. GI can be defined as green area build in the develop area such as forest, park, wetland or floodway. The role of GI is to improve life standard such as water filtration or flood control. Among the twenty models that have been compared to MSMA SME, ten models were selected to conduct a comprehensive review for this study. These are known to be widely accepted by water resource researchers. These ten tools are further classified into three major categories as models that address the stormwater management ability of GI in terms of quantity and quality, models that have the capability of conducting the

  15. Valuating Indonesian upstream oil management scenario through system dynamics modelling

    Science.gov (United States)

    Ketut Gunarta, I.; Putri, F. A.

    2018-04-01

    Under the existing regulation in Constitution Number 22 Year 2001 (UU No 22 Tahun 2001), Production Sharing Contract (PSC) continues to be the scenario in conducting oil and gas upstream mining activities as the previous regulation (UU No. 8 Tahun 1971). Because of the high costs and risks in upstream mining activities, the contractors are dominated by foreign companies, meanwhile National Oil Company (NOC) doesn’t act much. The domination of foreign contractor companies also warned Indonesia in several issues addressing to energy independence and energy security. Therefore, to achieve the goals of energy which is independence and security, there need to be a revision in upstream oil activities regulating scenario. The scenarios will be comparing the current scenario, which is PSC, with the “full concession” scenario for National Oil Company (NOC) in managing oil upstream mining activities. Both scenario will be modelled using System Dynamics methodology and assessed furthermore using financial valuation method of income approach. Under the 2 scenarios, the author will compare which scenario is better for upstream oil management in reaching the goals mentioned before and more profitable in financial aspect. From the simulation, it is gathered that concession scenario offers better option than PSC in reaching energy independence and energy security.

  16. A survey of university students' perceptions of learning management systems in a low-resource setting using a technology acceptance model.

    Science.gov (United States)

    Chipps, Jennifer; Kerr, Jane; Brysiewicz, Petra; Walters, Fiona

    2015-02-01

    Learning management systems have been widely advocated for the support of distance learning. In low-resource settings, the uptake of these systems by students has been mixed. This study aimed to identify, through the use of the Technology Acceptance Model, the individual, organizational, and technological factors that could be influencing the use of learning management systems. A simple quantitative descriptive survey was conducted of nursing and health science students at a university in South Africa as part of their first exposure to a learning management system. A total of 274 respondents (56.7%) completed the survey questionnaire, made up of 213 nursing respondents (87.7%) and 61 health sciences respondents (25%). Overall, the respondents found the learning management system easy to use and useful for learning. There were significant differences between the two groups of respondents, with the respondents from health sciences being both younger and more computer literate. The nursing respondents, who received more support and orientations, reported finding the learning management system more useful. Recommendations are made for training and support to ensure uptake.

  17. 1995 Baseline solid waste management system description

    International Nuclear Information System (INIS)

    Anderson, G.S.; Konynenbelt, H.S.

    1995-09-01

    This provides a detailed solid waste system description that documents the treatment, storage, and disposal (TSD) strategy for managing Hanford's solid low-level waste, low-level mixed waste, transuranic and transuranic mixed waste, and greater-than-Class III waste. This system description is intended for use by managers of the solid waste program, facility and system planners, as well as system modelers. The system description identifies the TSD facilities that constitute the solid waste system and defines these facilities' interfaces, schedules, and capacities. It also provides the strategy for treating each of the waste streams generated or received by the Hanford Site from generation or receipt through final destination

  18. A Process Management System for Networked Manufacturing

    Science.gov (United States)

    Liu, Tingting; Wang, Huifen; Liu, Linyan

    With the development of computer, communication and network, networked manufacturing has become one of the main manufacturing paradigms in the 21st century. Under the networked manufacturing environment, there exist a large number of cooperative tasks susceptible to alterations, conflicts caused by resources and problems of cost and quality. This increases the complexity of administration. Process management is a technology used to design, enact, control, and analyze networked manufacturing processes. It supports efficient execution, effective management, conflict resolution, cost containment and quality control. In this paper we propose an integrated process management system for networked manufacturing. Requirements of process management are analyzed and architecture of the system is presented. And a process model considering process cost and quality is developed. Finally a case study is provided to explain how the system runs efficiently.

  19. Rancang Bangun Document Management System Untuk Mengelola Dokumen Standart Operational Procedure

    Directory of Open Access Journals (Sweden)

    I Putu Susila Handika

    2017-09-01

    Standard Operational Procedure (SOP is one important document in a company because it is useful to improve the quality of the company. PT. Global Retailindo Pratama is one of the companies engaged in retail that using standard of quality management ISO 9001: 2008. Currently the management of SOP documents at PT. Global Retailindo Pratama still use manual way. Manual way cause some problems such as the search process and document distribution process takes quite a long time. This research aims to design and build Document Management System to manage SOP documents. The system development model used in this research is prototyping model. This application is built in web-based with PHP as programming language. Testing the application using Blak Box Testing and Usability Testing shows that the Document Management System can run in accordance with the needs and can be used easily so that the process of document management SOP becomes faster. Keywords: Document Management System, Standart Operational Procedure, Information System, PHP.

  20. Investigating the success of operational business process management systems

    NARCIS (Netherlands)

    Poelmans, S.; Reijers, H.A.; Recker, J.

    2013-01-01

    Business process management systems (BPMS) belong to a class of enterprise information systems that are characterized by the dependence on explicitly modeled process logic. Through the process logic, it is relatively easy to manage explicitly the routing and allocation of work items along a business

  1. SPIRE Data-Base Management System

    Science.gov (United States)

    Fuechsel, C. F.

    1984-01-01

    Spacelab Payload Integration and Rocket Experiment (SPIRE) data-base management system (DBMS) based on relational model of data bases. Data bases typically used for engineering and mission analysis tasks and, unlike most commercially available systems, allow data items and data structures stored in forms suitable for direct analytical computation. SPIRE DBMS designed to support data requests from interactive users as well as applications programs.

  2. Establishment of Textbook Information Management System Based on Active Server Page

    Science.gov (United States)

    Geng, Lihua

    2011-01-01

    In the process of textbook management of universities, the flow of storage, collection and check of textbook is quite complicated and daily management flow and system also seriously constrains the efficiency of the management process. Thus, in order to combine the information management model and the traditional management model, it is necessary…

  3. A distribution management system

    Energy Technology Data Exchange (ETDEWEB)

    Jaerventausta, P; Verho, P; Kaerenlampi, M; Pitkaenen, M [Tampere Univ. of Technology (Finland); Partanen, J [Lappeenranta Univ. of Technology (Finland)

    1998-08-01

    vendors of the other systems. In our research project this alternative is preferred and used in developing an independent distribution management system. This text describes the basic models and functions of the intelligent distribution management system, which has been developed in the research project. The basic platform was developed by the end of 1995. In 1996 and 1997 new applications (e.g automatic switchings) have been developed, the domain has been enlarged to comprise the low-voltage networks and subtransmission networks, and the computer system integration has been extended (e.g. full-duplex communication with the SCADA, open relational database connection with the AM/FM/GIS). The chapter gives a general description of the distribution management system as a whole

  4. CMS data and workflow management system

    CERN Document Server

    Fanfani, A; Bacchi, W; Codispoti, G; De Filippis, N; Pompili, A; My, S; Abbrescia, M; Maggi, G; Donvito, G; Silvestris, L; Calzolari, F; Sarkar, S; Spiga, D; Cinquili, M; Lacaprara, S; Biasotto, M; Farina, F; Merlo, M; Belforte, S; Kavka, C; Sala, L; Harvey, J; Hufnagel, D; Fanzago, F; Corvo, M; Magini, N; Rehn, J; Toteva, Z; Feichtinger, D; Tuura, L; Eulisse, G; Bockelman, B; Lundstedt, C; Egeland, R; Evans, D; Mason, D; Gutsche, O; Sexton-Kennedy, L; Dagenhart, D W; Afaq, A; Guo, Y; Kosyakov, S; Lueking, L; Sekhri, V; Fisk, I; McBride, P; Bauerdick, L; Bakken, J; Rossman, P; Wicklund, E; Wu, Y; Jones, C; Kuznetsov, V; Riley, D; Dolgert, A; van Lingen, F; Narsky, I; Paus, C; Klute, M; Gomez-Ceballos, G; Piedra-Gomez, J; Miller, M; Mohapatra, A; Lazaridis, C; Bradley, D; Elmer, P; Wildish, T; Wuerthwein, F; Letts, J; Bourilkov, D; Kim, B; Smith, P; Hernandez, J M; Caballero, J; Delgado, A; Flix, J; Cabrillo-Bartolome, I; Kasemann, M; Flossdorf, A; Stadie, H; Kreuzer, P; Khomitch, A; Hof, C; Zeidler, C; Kalini, S; Trunov, A; Saout, C; Felzmann, U; Metson, S; Newbold, D; Geddes, N; Brew, C; Jackson, J; Wakefield, S; De Weirdt, S; Adler, V; Maes, J; Van Mulders, P; Villella, I; Hammad, G; Pukhaeva, N; Kurca, T; Semneniouk, I; Guan, W; Lajas, J A; Teodoro, D; Gregores, E; Baquero, M; Shehzad, A; Kadastik, M; Kodolova, O; Chao, Y; Ming Kuo, C; Filippidis, C; Walzel, G; Han, D; Kalinowski, A; Giro de Almeida, N M; Panyam, N

    2008-01-01

    CMS expects to manage many tens of peta bytes of data to be distributed over several computing centers around the world. The CMS distributed computing and analysis model is designed to serve, process and archive the large number of events that will be generated when the CMS detector starts taking data. The underlying concepts and the overall architecture of the CMS data and workflow management system will be presented. In addition the experience in using the system for MC production, initial detector commissioning activities and data analysis will be summarized.

  5. New Challenges for the Management of the Development of Information Systems Based on Complex Mathematical Models

    DEFF Research Database (Denmark)

    Carugati, Andrea

    2002-01-01

    has been initiated with the scope of investigating the questions that mathematical modelling technology poses to traditional information systems development projects. Based on the past body of research, this study proposes a framework to guide decision making for managing projects of information......The advancements in complexity and sophistication of mathematical models for manufacturing scheduling and control and the increase of the ratio power/cost of computers are beginning to provide the manufacturing industry with new software tools to improve production. A Danish action research project...... systems development. In a presented case the indications of the model are compared with the decisions taken during the development. The results highlight discrepancies between the structure and predictions of the model and the case observations, especially with regard to the importance given to the users...

  6. Simple models of district heating systems for load and demand side management and operational optimisation; Simple modeller for fjernvarmesystemer med henblik pae belastningsudjaevning og driftsoptimering

    Energy Technology Data Exchange (ETDEWEB)

    Boehm, B. [Technical Univ. of Denmark, Dept. of Mechanical Engineering, Kgs. Lyngby (Denmark); Larsen, H.V. [Risoe National Lab., System Analysis Dept., Roskilde (DK)

    2004-12-01

    The purpose of this research project has been to further develop and test simple (aggregated) models of district heating (DH) systems for simulation and operational optimization, and to investigate the influence of Load Management and Demand Side Management (DMS) on the total operational costs. The work is based on physical-mathematical modelling and simulation of DH systems, and is a continuation of previous EFP-96 work. In the present EFP-2001 project the goals have been to improve the Danish method of aggregation by addressing the problem of aggregation of pressure losses, and to test the methods on a much larger data set than in the EFP-1996 project. In order to verify the models it is crucial to have good data at disposal. Full information on the heat loads and temperatures not only at the DH plant but also at every consumer (building) is needed, and therefore only a few DH systems in Denmark can supply such data. (BA)

  7. Space Station Freedom (SSF) Data Management System (DMS) performance model data base

    Science.gov (United States)

    Stovall, John R.

    1993-01-01

    The purpose of this document was originally to be a working document summarizing Space Station Freedom (SSF) Data Management System (DMS) hardware and software design, configuration, performance and estimated loading data from a myriad of source documents such that the parameters provided could be used to build a dynamic performance model of the DMS. The document is published at this time as a close-out of the DMS performance modeling effort resulting from the Clinton Administration mandated Space Station Redesign. The DMS as documented in this report is no longer a part of the redesigned Space Station. The performance modeling effort was a joint undertaking between the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) Flight Data Systems Division (FDSD) and the NASA Ames Research Center (ARC) Spacecraft Data Systems Research Branch. The scope of this document is limited to the DMS core network through the Man Tended Configuration (MTC) as it existed prior to the 1993 Clinton Administration mandated Space Station Redesign. Data is provided for the Standard Data Processors (SDP's), Multiplexer/Demultiplexers (MDM's) and Mass Storage Units (MSU's). Planned future releases would have added the additional hardware and software descriptions needed to describe the complete DMS. Performance and loading data through the Permanent Manned Configuration (PMC) was to have been included as it became available. No future releases of this document are presently planned pending completion of the present Space Station Redesign activities and task reassessment.

  8. Dual-Use Aspects of System Health Management

    Science.gov (United States)

    Owens, P. R.; Jambor, B. J.; Eger, G. W.; Clark, W. A.

    1994-01-01

    System Health Management functionality is an essential part of any space launch system. Health management functionality is an integral part of mission reliability, since it is needed to verify the reliability before the mission starts. Health Management is also a key factor in life cycle cost reduction and in increasing system availability. The degree of coverage needed by the system and the degree of coverage made available at a reasonable cost are critical parameters of a successful design. These problems are not unique to the launch vehicle world. In particular, the Intelligent Vehicle Highway System, commercial aircraft systems, train systems, and many types of industrial production facilities require various degrees of system health management. In all of these applications, too, the designers must balance the benefits and costs of health management in order to optimize costs. The importance of an integrated system is emphasized. That is, we present the case for considering health management as an integral part of system design, rather than functionality to be added on at the end of the design process. The importance of maintaining the system viewpoint is discussed in making hardware and software tradeoffs and in arriving at design decisions. We describe an approach to determine the parameters to be monitored in any system health management application. This approach is based on Design of Experiments (DOE), prototyping, failure modes and effects analyses, cost modeling and discrete event simulation. The various computer-based tools that facilitate the approach are discussed. The approach described originally was used to develop a fault tolerant avionics architecture for launch vehicles that incorporated health management as an integral part of the system. Finally, we discuss generalizing the technique to apply it to other domains. Several illustrations are presented.

  9. 3rd International Conference on Modelling, Computation and Optimization in Information Systems and Management Sciences

    CERN Document Server

    Dinh, Tao; Nguyen, Ngoc

    2015-01-01

    This proceedings set contains 85 selected full papers presented at the 3rd International Conference on Modelling, Computation and Optimization in Information Systems and Management Sciences - MCO 2015, held on May 11–13, 2015 at Lorraine University, France. The present part I of the 2 volume set includes articles devoted to Combinatorial optimization and applications, DC programming and DCA: thirty years of Developments, Dynamic Optimization, Modelling and Optimization in financial engineering, Multiobjective programming, Numerical Optimization, Spline Approximation and Optimization, as well as Variational Principles and Applications

  10. Data Envelopment Analysis (DEA) Model in Operation Management

    Science.gov (United States)

    Malik, Meilisa; Efendi, Syahril; Zarlis, Muhammad

    2018-01-01

    Quality management is an effective system in operation management to develops, maintains, and improves quality from groups of companies that allow marketing, production, and service at the most economycal level as well as ensuring customer satisfication. Many companies are practicing quality management to improve their bussiness performance. One of performance measurement is through measurement of efficiency. One of the tools can be used to assess efficiency of companies performance is Data Envelopment Analysis (DEA). The aim of this paper is using Data Envelopment Analysis (DEA) model to assess efficiency of quality management. In this paper will be explained CCR, BCC, and SBM models to assess efficiency of quality management.

  11. Problem reporting management system performance simulation

    Science.gov (United States)

    Vannatta, David S.

    1993-01-01

    This paper proposes the Problem Reporting Management System (PRMS) model as an effective discrete simulation tool that determines the risks involved during the development phase of a Trouble Tracking Reporting Data Base replacement system. The model considers the type of equipment and networks which will be used in the replacement system as well as varying user loads, size of the database, and expected operational availability. The paper discusses the dynamics, stability, and application of the PRMS and addresses suggested concepts to enhance the service performance and enrich them.

  12. Peculiarities of the risk management system organization in current conditions

    OpenAIRE

    MIKHIN P.O.

    2014-01-01

    Risk-management system organization problem is topical nowadays. The innovation activity is defined as an activity vulnerable to risk and needs more attention. The basic approaches and elements of organization structure development in risk-management system are considered to find out the best structure for business modelling usage. Balance and combination of risk-management system types are required in current conditions.

  13. New Management Tools – From Video Management Systems to Business Decision Systems

    Directory of Open Access Journals (Sweden)

    Emilian Cristian IRIMESCU

    2015-06-01

    Full Text Available In the last decades management was characterized by the increased use of Business Decision Systems, also called Decision Support Systems. More than that, systems that were until now used in a traditional way, for some simple activities (like security, migrated to the decision area of management. Some examples are the Video Management Systems from the physical security activity. This article will underline the way Video Management Systems passed to Business Decision Systems, which are the advantages of use thereof and which are the trends in this industry. The article will also analyze if at this moment Video Management Systems are real Business Decision Systems or if there are some functions missing to rank them at this level.

  14. Quantifying uncertainty in LCA-modelling of waste management systems

    DEFF Research Database (Denmark)

    Clavreul, Julie; Guyonnet, D.; Christensen, Thomas Højlund

    2012-01-01

    Uncertainty analysis in LCA studies has been subject to major progress over the last years. In the context of waste management, various methods have been implemented but a systematic method for uncertainty analysis of waste-LCA studies is lacking. The objective of this paper is (1) to present...... the sources of uncertainty specifically inherent to waste-LCA studies, (2) to select and apply several methods for uncertainty analysis and (3) to develop a general framework for quantitative uncertainty assessment of LCA of waste management systems. The suggested method is a sequence of four steps combining...

  15. Development of Pavement Maintenance Management System (PMMS of Urban Road Network Using HDM-4 Model

    Directory of Open Access Journals (Sweden)

    Tanuj Chopra

    2017-04-01

    Full Text Available The aim of the study is to develop Pavement Maintenance Management System (PMMS for four road sections of urban road network (Patiala, Punjab, India using Highway Development and Management (HDM-4 model. The HDM-4 provides a deterministic approach in data input and process data of existing road condition, traffic volume and pavement composition to predict road deterioration as per the urban road conditions in terms of International Roughness Index (IRI value. This study presents the use of HDM-4 model for the computation of optimum Maintenance and Rehabilitation (M&R strategy for each road section and comparative study of scheduled and condition responsive M&R strategies. The results of present study will be useful for gaining better support for decision-makers for adequate and timely fund allocations for preservation of the urban road network.

  16. Modeling impacts of water and fertilizer management on the ecosystem service of rice rotated cropping system in China

    Science.gov (United States)

    Chen, H.; Yu, C.; Li, C.

    2015-12-01

    Sustainable agricultural intensification demand optimum resource managements of agro-ecosystems. Detailed information on the impacts of water use and nutrient application on agro-ecosystem services including crop yields, greenhouse gas (GHG) emissions and nitrogen (N) loss is the key to guide field managements. In this study, we use the DeNitrification-DeComposition (DNDC) model to simulate the biogeochemical processes for rice rotated cropping systems in China. We set varied scenarios of water use in more than 1600 counties, and derived optimal rates of N application for each county in accordance to water use scenarios. Our results suggest that 0.88 ± 0.33 Tg per year (mean ± standard deviation) of synthetic N could be reduced without reducing rice yields, which accounts for 15.7 ± 5.9% of current N application in China. Field managements with shallow flooding and optimal N applications could enhance ecosystem services on a national scale, leading to 34.3% reduction of GHG emissions (CH4, N2O, and CO2), 2.8% reduction of overall N loss (NH3 volatilization, denitrification and N leaching) and 1.7% increase of rice yields, as compared to current management conditions. Among provinces with major rice production, Jiangsu, Yunnan, Guizhou, and Hubei could achieve more than 40% reduction of GHG emissions under appropriate water managements, while Zhejiang, Guangdong, and Fujian could reduce more than 30% N loss with optimal N applications. Our modeling efforts suggest that China is likely to benefit from reforming water and fertilization managements for rice rotated cropping system in terms of sustainable crop yields, GHG emission mitigation and N loss reduction, and the reformation should be prioritized in the above-mentioned provinces. Keywords: water regime, nitrogen fertilization, sustainable management, ecological modeling, DNDC

  17. Theoretical and Practical Aspects of Logistic Quality Management System Documentation Development Process

    Directory of Open Access Journals (Sweden)

    Linas Šaulinskas

    2013-12-01

    Full Text Available This paper addresses aspects of logistics quality management system documentation development and suggests models for quality management system documentation development, documentation hierarchical systems and authorization approval. It also identifies logistic processes and a responsibilities model and a detailed document development and approval process that can be practically applied. Our results are based upon an analysis of advanced Lithuanian and foreign corporate business practices, a review of current literature and recommendations for quality management system standards.

  18. A Review of Distributed Parameter Groundwater Management Modeling Methods

    Science.gov (United States)

    Gorelick, Steven M.

    1983-04-01

    Models which solve the governing groundwater flow or solute transport equations in conjunction with optimization techniques, such as linear and quadratic programing, are powerful aquifer management tools. Groundwater management models fall in two general categories: hydraulics or policy evaluation and water allocation. Groundwater hydraulic management models enable the determination of optimal locations and pumping rates of numerous wells under a variety of restrictions placed upon local drawdown, hydraulic gradients, and water production targets. Groundwater policy evaluation and allocation models can be used to study the influence upon regional groundwater use of institutional policies such as taxes and quotas. Furthermore, fairly complex groundwater-surface water allocation problems can be handled using system decomposition and multilevel optimization. Experience from the few real world applications of groundwater optimization-management techniques is summarized. Classified separately are methods for groundwater quality management aimed at optimal waste disposal in the subsurface. This classification is composed of steady state and transient management models that determine disposal patterns in such a way that water quality is protected at supply locations. Classes of research missing from the literature are groundwater quality management models involving nonlinear constraints, models which join groundwater hydraulic and quality simulations with political-economic management considerations, and management models that include parameter uncertainty.

  19. GIS-based spatial decision support system for grain logistics management

    Science.gov (United States)

    Zhen, Tong; Ge, Hongyi; Jiang, Yuying; Che, Yi

    2010-07-01

    Grain logistics is the important component of the social logistics, which can be attributed to frequent circulation and the great quantity. At present time, there is no modern grain logistics distribution management system, and the logistics cost is the high. Geographic Information Systems (GIS) have been widely used for spatial data manipulation and model operations and provide effective decision support through its spatial database management capabilities and cartographic visualization. In the present paper, a spatial decision support system (SDSS) is proposed to support policy makers and to reduce the cost of grain logistics. The system is composed of two major components: grain logistics goods tracking model and vehicle routing problem optimization model and also allows incorporation of data coming from external sources. The proposed system is an effective tool to manage grain logistics in order to increase the speed of grain logistics and reduce the grain circulation cost.

  20. Robustness of a Distributed Knowledge Management Model

    DEFF Research Database (Denmark)

    Pedersen, Mogens Kühn; Larsen, Michael Holm

    1999-01-01

    Knowledge management based on symmetric incentives is rarely found in literature. A knowledge exchange model relies upon a double loop knowledge conversion with symmetric incentives in a network. The model merges specific knowledge with knowledge from other actors into a decision support system...

  1. Journal of Modeling, Design and Management of Engineering ...

    African Journals Online (AJOL)

    Journal of Modeling, Design and Management of Engineering Systems. ... Journal Home > Vol 5, No 1 (2007) ... or mathematical modeling, computing, simulation, design and/or operations research tools for solving engineering problems.

  2. How models can support ecosystem-based management of coral reefs

    Science.gov (United States)

    Weijerman, Mariska; Fulton, Elizabeth A.; Janssen, Annette B. G.; Kuiper, Jan J.; Leemans, Rik; Robson, Barbara J.; van de Leemput, Ingrid A.; Mooij, Wolf M.

    2015-11-01

    Despite the importance of coral reef ecosystems to the social and economic welfare of coastal communities, the condition of these marine ecosystems have generally degraded over the past decades. With an increased knowledge of coral reef ecosystem processes and a rise in computer power, dynamic models are useful tools in assessing the synergistic effects of local and global stressors on ecosystem functions. We review representative approaches for dynamically modeling coral reef ecosystems and categorize them as minimal, intermediate and complex models. The categorization was based on the leading principle for model development and their level of realism and process detail. This review aims to improve the knowledge of concurrent approaches in coral reef ecosystem modeling and highlights the importance of choosing an appropriate approach based on the type of question(s) to be answered. We contend that minimal and intermediate models are generally valuable tools to assess the response of key states to main stressors and, hence, contribute to understanding ecological surprises. As has been shown in freshwater resources management, insight into these conceptual relations profoundly influences how natural resource managers perceive their systems and how they manage ecosystem recovery. We argue that adaptive resource management requires integrated thinking and decision support, which demands a diversity of modeling approaches. Integration can be achieved through complimentary use of models or through integrated models that systemically combine all relevant aspects in one model. Such whole-of-system models can be useful tools for quantitatively evaluating scenarios. These models allow an assessment of the interactive effects of multiple stressors on various, potentially conflicting, management objectives. All models simplify reality and, as such, have their weaknesses. While minimal models lack multidimensionality, system models are likely difficult to interpret as they

  3. Federal Emergency Management Information System (FEMIS) data management guide, version 1.4.5

    Energy Technology Data Exchange (ETDEWEB)

    Burnett, R.A.; Downing, T.R.; Gaustad, K.L. [and others

    1998-06-26

    The Federal Emergency Management Information System (FEMIS) information resources are described in this FEMIS Data Management Guide. To comprehend what types of data are present, where the data is located, and how it is managed during the life span of the system, a basic understanding of the FEMIS architecture is necessary. The system is being developed by Pacific Northwest National Laboratory (PNNL) and is designed for a single Chemical Stockpile Emergency Preparedness Program (CSEPP) site that has multiple Emergency Operations Centers (EOCs). The capability to connect to remote CSEPP sites and share information will be present in a future release. Each EOC has personal computers (PCs) that emergency planners and operations personnel use to do their jobs. These PCs are connected via a local area network (LAN) to servers that provide efficient EOC-wide services. Each EOC is interconnected to other EOCs via telecommunications links. FEMIS is a client/server system where much of the application software is located in the client PC. This client software integrates the FEMIS application, government furnished dispersion and evacuation models, and Commercial-Off-The-Shelf (COTS) software tools such as the ArcView geographic information system (GIS) and Microsoft Project (electron planning). A UNIX server provides data management services, ARC/INFO GIS capabilities, evacuation (Evac) modeling, electron main (E-mail), and meteorological (Met) input processing. A PC communication utility is available to interface with external subsystems. At this time, the weather collection system (Handar Met System) is the only external subsystem.

  4. Environmental systems analysis of wastewater management

    International Nuclear Information System (INIS)

    Kaerrman, Erik

    2000-01-01

    The history of wastewater management tells us that efforts have been made at solving only one problem at the time; sanitation during the first half of the 20th Century followed by eutrophication of lakes and sea and, for the past ten years, recycling of nutrients. After the 'Brundtland Report', 1987, a reversal of the debate occurred where water management was discussed in a more holistic manner than before. The concept sustainable development became widely accepted and was put into practice. This thesis suggests a framework for evaluating the sustainability of wastewater systems, which contains the use of criteria and system analytical evaluation methods matching each criterion. The main categories of criteria are identified as: Health and Hygiene, Social and Cultural, Environmental, Economic and Functional and Technical. The usability of different concepts of Environmental Systems Analysis for evaluating environmental criteria of wastewater systems is also investigated. These studies show that a substance-flow model combined with evaluation methods from Life Cycle Assessment (LCA), sometimes complemented with Exergy Analysis or Analysis of Primary Energy, is a beneficial approach for evaluating environmental impacts and the usage of resources. The substance-flow model ORWARE (ORganic WAste REsearch) combined with LCA was used to compare four systems structures for the management of household wastewater and solid organic waste, namely Conventional System, Irrigation of Energy Forests, Liquid Composting and Urine Separation. This study shows a potential for further development of the three alternative systems. The comparative study also included some development of system analytical methods. This thesis shows how the contribution from oxidation of ammonia should be included in the eutrophication impact category. Furthermore, a method is given for prioritization of the most relevant impacts from wastewater management by using normalisation of these impacts in

  5. SYSTEMS FOR IMPROVEMENT OF BUSINESS INTEGRATED MANAGEMENT PROCESSES IN PORTS

    Directory of Open Access Journals (Sweden)

    Pavle Popovic

    2017-03-01

    Full Text Available Based on test results obtained so far, the objective relating to modern scientific methods and approaches has been defined with the intention to develop model which defines new management system integration model, by adopting necessary practical terms of real systems that most frequently circulate in maritime practice in the field of integrated management systems (IMS in terms of safety and security of vessels and ports. The subject of research is maritime, particularly port services, by way of defining internal and external advantages through adopting integrated management systems. The research will be conducted through theoretical and applied assessments of case study analyses using example of the Port of Kotor H.Co.

  6. Application of Complex Adaptive Systems in Portfolio Management

    Science.gov (United States)

    Su, Zheyuan

    2017-01-01

    Simulation-based methods are becoming a promising research tool in financial markets. A general Complex Adaptive System can be tailored to different application scenarios. Based on the current research, we built two models that would benefit portfolio management by utilizing Complex Adaptive Systems (CAS) in Agent-based Modeling (ABM) approach.…

  7. Transition management as a model for managing processes of co-evolution towards sustainable development

    NARCIS (Netherlands)

    R. Kemp (René); D.A. Loorbach (Derk); J. Rotmans (Jan)

    2007-01-01

    textabstractSustainable development requires changes in socio-technical systems and wider societal change - in beliefs, values and governance that co-evolve with technology changes. In this article we present a practical model for managing processes of co-evolution: transition management. Transition

  8. Operations management system

    Science.gov (United States)

    Brandli, A. E.; Eckelkamp, R. E.; Kelly, C. M.; Mccandless, W.; Rue, D. L.

    1990-01-01

    The objective of an operations management system is to provide an orderly and efficient method to operate and maintain aerospace vehicles. Concepts are described for an operations management system and the key technologies are highlighted which will be required if this capability is brought to fruition. Without this automation and decision aiding capability, the growing complexity of avionics will result in an unmanageable workload for the operator, ultimately threatening mission success or survivability of the aircraft or space system. The key technologies include expert system application to operational tasks such as replanning, equipment diagnostics and checkout, global system management, and advanced man machine interfaces. The economical development of operations management systems, which are largely software, will require advancements in other technological areas such as software engineering and computer hardware.

  9. Application fields for the new Object Management Group (OMG) Standards Case Management Model and Notation (CMMN) and Decision Management Notation (DMN) in the perioperative field.

    Science.gov (United States)

    Wiemuth, M; Junger, D; Leitritz, M A; Neumann, J; Neumuth, T; Burgert, O

    2017-08-01

    Medical processes can be modeled using different methods and notations. Currently used modeling systems like Business Process Model and Notation (BPMN) are not capable of describing the highly flexible and variable medical processes in sufficient detail. We combined two modeling systems, Business Process Management (BPM) and Adaptive Case Management (ACM), to be able to model non-deterministic medical processes. We used the new Standards Case Management Model and Notation (CMMN) and Decision Management Notation (DMN). First, we explain how CMMN, DMN and BPMN could be used to model non-deterministic medical processes. We applied this methodology to model 79 cataract operations provided by University Hospital Leipzig, Germany, and four cataract operations provided by University Eye Hospital Tuebingen, Germany. Our model consists of 85 tasks and about 20 decisions in BPMN. We were able to expand the system with more complex situations that might appear during an intervention. An effective modeling of the cataract intervention is possible using the combination of BPM and ACM. The combination gives the possibility to depict complex processes with complex decisions. This combination allows a significant advantage for modeling perioperative processes.

  10. Addressing drug adherence using an operations management model.

    Science.gov (United States)

    Nunlee, Martin; Bones, Michelle

    2014-01-01

    OBJECTIVE To provide a model that enables health systems and pharmacy benefit managers to provide medications reliably and test for reliability and validity in the analysis of adherence to drug therapy of chronic disease. SUMMARY The quantifiable model described here can be used in conjunction with behavioral designs of drug adherence assessments. The model identifies variables that can be reproduced and expanded across the management of chronic diseases with drug therapy. By creating a reorder point system for reordering medications, the model uses a methodology commonly seen in operations research. The design includes a safety stock of medication and current supply of medication, which increases the likelihood that patients will have a continuous supply of medications, thereby positively affecting adherence by removing barriers. CONCLUSION This method identifies an adherence model that quantifies variables related to recommendations from health care providers; it can assist health care and service delivery systems in making decisions that influence adherence based on the expected order cycle days and the expected daily quantity of medication administered. This model addresses the possession of medication as a barrier to adherence.

  11. SYNTHESIS OF INFORMATION SYSTEM FOR SMART HOUSE HARDWARE MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Vikentyeva Olga Leonidovna

    2017-10-01

    Full Text Available Subject: smart house maintenance requires taking into account a number of factors: resource-saving, reduction of operational expenditures, safety enhancement, providing comfortable working and leisure conditions. Automation of the corresponding engineering systems of illumination, climate control, security as well as communication systems and networks via utilization of contemporary technologies (e.g., IoT - Internet of Things poses a significant challenge related to storage and processing of the overwhelmingly massive volume of data whose utilization extent is extremely low nowadays. Since a building’s lifespan is large enough and exceeds the lifespan of codes and standards that take into account the requirements of safety, comfort, energy saving, etc., it is necessary to consider management aspects in the context of rational use of large data at the stage of information modeling. Research objectives: increase the efficiency of managing the subsystems of smart buildings hardware on the basis of a web-based information system that has a flexible multi-level architecture with several control loops and an adaptation model. Materials and methods: since a smart house belongs to man-machine systems, the cybernetic approach is considered as the basic method for design and research of information management system. Instrumental research methods are represented by set-theoretical modelling, automata theory and architectural principles of organization of information management systems. Results: a flexible architecture of information system for management of smart house hardware subsystems has been synthesized. This architecture encompasses several levels: client level, application level and data level as well as three layers: presentation level, actuating device layer and analytics layer. The problem of growing volumes of information processed by realtime message controller is attended by employment of sensors and actuating mechanisms with configurable

  12. Coupling of a distributed stakeholder-built system dynamics socio-economic model with SAHYSMOD for sustainable soil salinity management. Part 2: Model coupling and application

    Science.gov (United States)

    Inam, Azhar; Adamowski, Jan; Prasher, Shiv; Halbe, Johannes; Malard, Julien; Albano, Raffaele

    2017-08-01

    Many simulation models focus on simulating a single physical process and do not constitute balanced representations of the physical, social and economic components of a system. The present study addresses this challenge by integrating a physical (P) model (SAHYSMOD) with a group (stakeholder) built system dynamics model (GBSDM) through a component modeling approach based on widely applied tools such as MS Excel, Python and Visual Basic for Applications (VBA). The coupled model (P-GBSDM) was applied to test soil salinity management scenarios (proposed by stakeholders) for the Haveli region of the Rechna Doab Basin in Pakistan. Scenarios such as water banking, vertical drainage, canal lining, and irrigation water reallocation were simulated with the integrated model. Spatiotemporal maps and economic and environmental trade-off criteria were used to examine the effectiveness of the selected management scenarios. After 20 years of simulation, canal lining reduced soil salinity by 22% but caused an initial reduction of 18% in farm income, which requires an initial investment from the government. The government-sponsored Salinity Control and Reclamation Project (SCARP) is a short-term policy that resulted in a 37% increase in water availability with a 12% increase in farmer income. However, it showed detrimental effects on soil salinity in the long term, with a 21% increase in soil salinity due to secondary salinization. The new P-GBSDM was shown to be an effective platform for engaging stakeholders and simulating their proposed management policies while taking into account socioeconomic considerations. This was not possible using the physically based SAHYSMOD model alone.

  13. Development of an Information Database for the Integrated Airline Management System (IAMS

    Directory of Open Access Journals (Sweden)

    Bogdane Ruta

    2017-08-01

    Full Text Available In present conditions the activity of any enterprise is represented as a combination of operational processes. Each of them corresponds to relevant airline management systems. Combining two or more management systems, it is possible to obtain an integrated management system. For the effective functioning of the integrated management system, an appropriate information system should be developed. This article proposes a model of such an information system.

  14. The Ragnarok Architectural Software Configuration Management Model

    DEFF Research Database (Denmark)

    Christensen, Henrik Bærbak

    1999-01-01

    The architecture is the fundamental framework for designing and implementing large scale software, and the ability to trace and control its evolution is essential. However, many traditional software configuration management tools view 'software' merely as a set of files, not as an architecture....... This introduces an unfortunate impedance mismatch between the design domain (architecture level) and configuration management domain (file level.) This paper presents a software configuration management model that allows tight version control and configuration management of the architecture of a software system...

  15. Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP)

  16. THRMS: A pilot risk management system

    International Nuclear Information System (INIS)

    Xue, D.; Xu, Y.

    2000-01-01

    Daya Bay NPP is the first commercial nuclear power plant in China. This plant is interested in and pro-active towards the development and application of PSA and PSA tools. This, together with the support from the IAEA promoted the project 'THRMS: the pilot study of risk management system for NPP'. The objectives in development and implementation of THRMS includes: survey and discuss on the development of the approaches used in constructing plant risk models; design and study on the realization of a real-time risk management system. An overview of the project is presented in this paper. (author)

  17. Integrated Baseline System (IBS) Version 2.0: Models guide

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool being developed under the direction of the US Army Nuclear and Chemical Agency. This Models Guide summarizes the IBS use of several computer models for predicting the results of emergency situations. These include models for predicting dispersion/doses of airborne contaminants, traffic evacuation, explosion effects, heat radiation from a fire, and siren sound transmission. The guide references additional technical documentation on the models when such documentation is available from other sources. The audience for this manual is chiefly emergency management planners and analysts, but also data managers and system managers.

  18. Optimization of large-scale heterogeneous system-of-systems models.

    Energy Technology Data Exchange (ETDEWEB)

    Parekh, Ojas; Watson, Jean-Paul; Phillips, Cynthia Ann; Siirola, John; Swiler, Laura Painton; Hough, Patricia Diane (Sandia National Laboratories, Livermore, CA); Lee, Herbert K. H. (University of California, Santa Cruz, Santa Cruz, CA); Hart, William Eugene; Gray, Genetha Anne (Sandia National Laboratories, Livermore, CA); Woodruff, David L. (University of California, Davis, Davis, CA)

    2012-01-01

    Decision makers increasingly rely on large-scale computational models to simulate and analyze complex man-made systems. For example, computational models of national infrastructures are being used to inform government policy, assess economic and national security risks, evaluate infrastructure interdependencies, and plan for the growth and evolution of infrastructure capabilities. A major challenge for decision makers is the analysis of national-scale models that are composed of interacting systems: effective integration of system models is difficult, there are many parameters to analyze in these systems, and fundamental modeling uncertainties complicate analysis. This project is developing optimization methods to effectively represent and analyze large-scale heterogeneous system of systems (HSoS) models, which have emerged as a promising approach for describing such complex man-made systems. These optimization methods enable decision makers to predict future system behavior, manage system risk, assess tradeoffs between system criteria, and identify critical modeling uncertainties.

  19. A framework for human-hydrologic system model development integrating hydrology and water management: application to the Cutzamala water system in Mexico

    Science.gov (United States)

    Wi, S.; Freeman, S.; Brown, C.

    2017-12-01

    This study presents a general approach to developing computational models of human-hydrologic systems where human modification of hydrologic surface processes are significant or dominant. A river basin system is represented by a network of human-hydrologic response units (HHRUs) identified based on locations where river regulations happen (e.g., reservoir operation and diversions). Natural and human processes in HHRUs are simulated in a holistic framework that integrates component models representing rainfall-runoff, river routing, reservoir operation, flow diversion and water use processes. We illustrate the approach in a case study of the Cutzamala water system (CWS) in Mexico, a complex inter-basin water transfer system supplying the Mexico City Metropolitan Area (MCMA). The human-hydrologic system model for CWS (CUTZSIM) is evaluated in terms of streamflow and reservoir storages measured across the CWS and to water supplied for MCMA. The CUTZSIM improves the representation of hydrology and river-operation interaction and, in so doing, advances evaluation of system-wide water management consequences under altered climatic and demand regimes. The integrated modeling framework enables evaluation and simulation of model errors throughout the river basin, including errors in representation of the human component processes. Heretofore, model error evaluation, predictive error intervals and the resultant improved understanding have been limited to hydrologic processes. The general framework represents an initial step towards fuller understanding and prediction of the many and varied processes that determine the hydrologic fluxes and state variables in real river basins.

  20. User Requirements Model for University Timetable Management System

    OpenAIRE

    Ahmad Althunibat; Mohammad I. Muhairat

    2016-01-01

    Automated timetables are used to schedule courses, lectures and rooms in universities by considering some constraints. Inconvenient and ineffective timetables often waste time and money. Therefore, it is important to investigate the requirements and potential needs of users. Thus, eliciting user requirements of University Timetable Management System (TMS) and their implication becomes an important process for the implementation of TMS. On this note, this paper seeks to propose a m...

  1. IMPROVING MANAGEMENT INFORMATION SYSTEMS AT A HIGHER EDUCATIONAL INSTITUTION

    Directory of Open Access Journals (Sweden)

    Nataliya N. Fedyakova

    2016-06-01

    Full Text Available Introduction: this paper deals with the foreign and domestic experience of creation and use of educational institution management automation systems. The problems of higher educational institutions management are essential in conditions of growing competition between educational institutions. Their complexity and timeliness defines multifunctional activity of higher educational institutions, diversity of funding sources, the variety of forms and types of educational, scientific, industrial and economic activities, the need for monitoring of the market of educational services and the labor market (including the need for employment of graduates, the necessity for adaptation to continuously changing economic conditions. Materials and Methods: system approach and method of comparison were used in analysing the current state of development and organisation of the automated information systems of higher education. These methods were also used to compare the qualitative characteristics of different technologies and methods of creation of the automated information systems. Results: the foreign and domestic educational institution management automation systems SIMS. net, Capita Education, SPRUT, Galaxy of Higher Educational Institution Management”, and “GSVedomosty” were analysed. Disadvantages of the functional module AIS – AWP pertaining to the University Rector of the higher educational institution were found. The improvement of higher educational institution AIS by implementing decision support systems for the management, made on the basis of the model of SaaS (software as a service is discussed. The author developed a model of automated score-rating system to assess the individual performance of students. Discussion and Conclusions: the author tackles the problems of higher educational institution AIS taking into account the specifics of the use of higher educational institution management information systems. They have a practical

  2. Prognostics and health management of photovoltaic systems

    Science.gov (United States)

    Johnson, Jay; Riley, Daniel

    2018-04-10

    The various technologies presented herein relate to providing prognosis and health management (PHM) of a photovoltaic (PV) system. A PV PHM system can eliminate long-standing issues associated with detecting performance reduction in PV systems. The PV PHM system can utilize an ANN model with meteorological and power input data to facilitate alert generation in the event of a performance reduction without the need for information about the PV PHM system components and design. Comparisons between system data and the PHM model can provide scheduling of maintenance on an as-needed basis. The PHM can also provide an approach for monitoring system/component degradation over the lifetime of the PV system.

  3. Costs of Tractor Ownership under Different Management Systems in ...

    African Journals Online (AJOL)

    Costs of Tractor Ownership under Different Management Systems in Nigeria. ... It requires high initial capital investment. ... making management plans and decisions especially in comparing different tractor types and models thereby assisting ...

  4. Brand Equity Evolution: a System Dynamics Model

    Directory of Open Access Journals (Sweden)

    Edson Crescitelli

    2009-04-01

    Full Text Available One of the greatest challenges in brand management lies in monitoring brand equity over time. This paper aimsto present a simulation model able to represent this evolution. The model was drawn on brand equity concepts developed by Aaker and Joachimsthaler (2000, using the system dynamics methodology. The use ofcomputational dynamic models aims to create new sources of information able to sensitize academics and managers alike to the dynamic implications of their brand management. As a result, an easily implementable model was generated, capable of executing continuous scenario simulations by surveying casual relations among the variables that explain brand equity. Moreover, the existence of a number of system modeling tools will allow extensive application of the concepts used in this study in practical situations, both in professional and educational settings

  5. Numerical modeling and remote sensing of global water management systems: Applications for land surface modeling, satellite missions, and sustainable water resources

    Science.gov (United States)

    Solander, Kurt C.

    The ability to accurately quantify water storages and fluxes in water management systems through observations or models is of increasing importance due to the expected impacts from climate change and population growth worldwide. Here, I describe three innovative techniques developed to better understand this problem. First, a model was created to represent reservoir storage and outflow with the objective of integration into a Land Surface Model (LSM) to simulate the impacts of reservoir management on the climate system. Given this goal, storage capacity represented the lone model input required that is not already available to an LSM user. Model parameterization was linked to air temperature to allow future simulations to adapt to a changing climate, making it the first such model to mimic the potential response of a reservoir operator to climate change. Second, spatial and temporal error properties of future NASA Surface Water and Ocean Topography (SWOT) satellite reservoir operations were quantified. This work invoked the use of the SWOTsim instrument simulator, which was run over a number of synthetic and actual reservoirs so the resulting error properties could be extrapolated to the global scale. The results provide eventual users of SWOT data with a blueprint of expected reservoir error properties so such characteristics can be determined a priori for a reservoir given knowledge about its topology and anticipated repeat orbit pass over its location. Finally, data from the Gravity Recovery and Climate Experiment (GRACE) satellite mission was used in conjunction with in-situ water use records to evaluate sustainable water use at the two-digit HUC basin scale over the contiguous United States. Results indicate that the least sustainable water management region is centered in the southwest, where consumptive water use exceeded water availability by over 100% on average for some of these basins. This work represents the first attempt at evaluating sustainable

  6. Business modelling of strategic management by the enterprise intellectual capital

    OpenAIRE

    Zhuravleva, I.

    2009-01-01

    The article is devoted to the resource and process approach to formation of the strategic management concept by the enterprise intellectual capital. The business model of strategic management by the intellectual capital in the environment of system business-modelling Business Studio 3 is developed.

  7. Multidisciplinary Management: Model of Excellence in the Management Applied to Products and Services

    OpenAIRE

    Guerreiro , Evandro ,; Costa Neto , Pedro ,; Moreira Filho , Ulysses ,

    2014-01-01

    Part 1: Knowledge-Based Performance Improvement; International audience; The Multidisciplinary Management is the guiding vision of modern organizations and the systems thinking which requires new approaches to organizational excellence and quality management process. The objective of this article is to present a model for multidisciplinary management of quality applied to products and services based on American, Japanese, and Brazilian National Quality Awards. The methodology used to build th...

  8. Management of groundwater in-situ bioremediation system using reactive transport modelling under parametric uncertainty: field scale application

    Science.gov (United States)

    Verardo, E.; Atteia, O.; Rouvreau, L.

    2015-12-01

    In-situ bioremediation is a commonly used remediation technology to clean up the subsurface of petroleum-contaminated sites. Forecasting remedial performance (in terms of flux and mass reduction) is a challenge due to uncertainties associated with source properties and the uncertainties associated with contribution and efficiency of concentration reducing mechanisms. In this study, predictive uncertainty analysis of bio-remediation system efficiency is carried out with the null-space Monte Carlo (NSMC) method which combines the calibration solution-space parameters with the ensemble of null-space parameters, creating sets of calibration-constrained parameters for input to follow-on remedial efficiency. The first step in the NSMC methodology for uncertainty analysis is model calibration. The model calibration was conducted by matching simulated BTEX concentration to a total of 48 observations from historical data before implementation of treatment. Two different bio-remediation designs were then implemented in the calibrated model. The first consists in pumping/injection wells and the second in permeable barrier coupled with infiltration across slotted piping. The NSMC method was used to calculate 1000 calibration-constrained parameter sets for the two different models. Several variants of the method were implemented to investigate their effect on the efficiency of the NSMC method. The first variant implementation of the NSMC is based on a single calibrated model. In the second variant, models were calibrated from different initial parameter sets. NSMC calibration-constrained parameter sets were sampled from these different calibrated models. We demonstrate that in context of nonlinear model, second variant avoids to underestimate parameter uncertainty which may lead to a poor quantification of predictive uncertainty. Application of the proposed approach to manage bioremediation of groundwater in a real site shows that it is effective to provide support in

  9. Healthcare waste management: an interpretive structural modeling approach.

    Science.gov (United States)

    Thakur, Vikas; Anbanandam, Ramesh

    2016-06-13

    Purpose - The World Health Organization identified infectious healthcare waste as a threat to the environment and human health. India's current medical waste management system has limitations, which lead to ineffective and inefficient waste handling practices. Hence, the purpose of this paper is to: first, identify the important barriers that hinder India's healthcare waste management (HCWM) systems; second, classify operational, tactical and strategical issues to discuss the managerial implications at different management levels; and third, define all barriers into four quadrants depending upon their driving and dependence power. Design/methodology/approach - India's HCWM system barriers were identified through the literature, field surveys and brainstorming sessions. Interrelationships among all the barriers were analyzed using interpretive structural modeling (ISM). Fuzzy-Matrice d'Impacts Croisés Multiplication Appliquée á un Classement (MICMAC) analysis was used to classify HCWM barriers into four groups. Findings - In total, 25 HCWM system barriers were identified and placed in 12 different ISM model hierarchy levels. Fuzzy-MICMAC analysis placed eight barriers in the second quadrant, five in third and 12 in fourth quadrant to define their relative ISM model importance. Research limitations/implications - The study's main limitation is that all the barriers were identified through a field survey and barnstorming sessions conducted only in Uttarakhand, Northern State, India. The problems in implementing HCWM practices may differ with the region, hence, the current study needs to be replicated in different Indian states to define the waste disposal strategies for hospitals. Practical implications - The model will help hospital managers and Pollution Control Boards, to plan their resources accordingly and make policies, targeting key performance areas. Originality/value - The study is the first attempt to identify India's HCWM system barriers and prioritize

  10. An extension of the technology acceptance model for business intelligence systems: project management maturity perspective

    Directory of Open Access Journals (Sweden)

    Mirjana Pejić Bach

    2017-01-01

    Full Text Available Business intelligence systems (BISs refer to wide range of technologies and applications useful for retrieving and analyzing the large amount of information with the goal to generate knowledge useful for making effective business decision. In order to investigate adoption of BISs in companies, we propose a model based on the technology acceptance model (TAM that is expanded by variables representing the concept of a project management maturity (PMM. The survey on the sample of USA companies has been conducted with the chief information officer (CIO as the main informant. Structural equations model has been developed in order to test the research model. Results indicate that TAM expanded with the notion of PMM is useful in increasing understanding of BISs adoption in companies.

  11. The Research on Safety Management Information System of Railway Passenger Based on Risk Management Theory

    Science.gov (United States)

    Zhu, Wenmin; Jia, Yuanhua

    2018-01-01

    Based on the risk management theory and the PDCA cycle model, requirements of the railway passenger transport safety production is analyzed, and the establishment of the security risk assessment team is proposed to manage risk by FTA with Delphi from both qualitative and quantitative aspects. The safety production committee is also established to accomplish performance appraisal, which is for further ensuring the correctness of risk management results, optimizing the safety management business processes and improving risk management capabilities. The basic framework and risk information database of risk management information system of railway passenger transport safety are designed by Ajax, Web Services and SQL technologies. The system realizes functions about risk management, performance appraisal and data management, and provides an efficient and convenient information management platform for railway passenger safety manager.

  12. Design management of electronic data interchange systems

    NARCIS (Netherlands)

    Heck, van H.W.G.M.

    1993-01-01

    This study deals with the management of the design process of Electronic Data Interchange (EDI) systems. Its objectives are (1) to investigate the design process of EDI systems from a practical and theoretical perspective; (2) to develop a model to describe factors relevant to EDI

  13. Integrating the radioactive waste management system into other management systems

    International Nuclear Information System (INIS)

    Silva, Ana Cristina Lourenco da; Nunes Neto, Carlos Antonio

    2007-01-01

    Radioactive waste management is to be included in the Integrated Management System (IMS) which pursues the continuous improvement of the company's quality, occupational safety and health, and environment protection processes. Radioactive waste management is based on the following aspects: optimization of human and material resources for execution of tasks, including the provision of a radiation protection supervisor to watch over the management of radioactive waste; improved documentation (management plan and procedures); optimization of operational levels for waste classification and release; maintenance of generation records and history through a database that facilitates traceability of information; implementation of radioactive waste segregation at source (source identification, monitoring and decontamination) activities intended to reduce the amount of radioactive waste; licensing of initial storage site for radioactive waste control and storage; employee awareness training on radioactive waste generation; identification and evaluation of emergency situations and response planning; implementation of preventive maintenance program for safety related items; development and application of new, advanced treatment methodologies or systems. These aspects are inherent in the concepts underlying quality management (establishment of administrative controls and performance indicators), environment protection (establishment of operational levels and controls for release), occupational health and safety (establishment of operational controls for exposure in emergency and routine situations and compliance with strict legal requirements and standards). It is noted that optimizing the addressed aspects of a radioactive waste management system further enhances the efficiency of the Integrated Management System for Quality, Environment, and Occupational Safety and Health. (author)

  14. General Business Model Patterns for Local Energy Management Concepts

    International Nuclear Information System (INIS)

    Facchinetti, Emanuele; Sulzer, Sabine

    2016-01-01

    The transition toward a more sustainable global energy system, significantly relying on renewable energies and decentralized energy systems, requires a deep reorganization of the energy sector. The way how energy services are generated, delivered, and traded is expected to be very different in the coming years. Business model innovation is recognized as a key driver for the successful implementation of the energy turnaround. This work contributes to this topic by introducing a heuristic methodology easing the identification of general business model patterns best suited for Local Energy Management concepts such as Energy Hubs. A conceptual framework characterizing the Local Energy Management business model solution space is developed. Three reference business model patterns providing orientation across the defined solution space are identified, analyzed, and compared. Through a market review, a number of successfully implemented innovative business models have been analyzed and allocated within the defined solution space. The outcomes of this work offer to potential stakeholders a starting point and guidelines for the business model innovation process, as well as insights for policy makers on challenges and opportunities related to Local Energy Management concepts.

  15. General Business Model Patterns for Local Energy Management Concepts

    Energy Technology Data Exchange (ETDEWEB)

    Facchinetti, Emanuele, E-mail: emanuele.facchinetti@hslu.ch; Sulzer, Sabine [Lucerne Competence Center for Energy Research, Lucerne University of Applied Science and Arts, Horw (Switzerland)

    2016-03-03

    The transition toward a more sustainable global energy system, significantly relying on renewable energies and decentralized energy systems, requires a deep reorganization of the energy sector. The way how energy services are generated, delivered, and traded is expected to be very different in the coming years. Business model innovation is recognized as a key driver for the successful implementation of the energy turnaround. This work contributes to this topic by introducing a heuristic methodology easing the identification of general business model patterns best suited for Local Energy Management concepts such as Energy Hubs. A conceptual framework characterizing the Local Energy Management business model solution space is developed. Three reference business model patterns providing orientation across the defined solution space are identified, analyzed, and compared. Through a market review, a number of successfully implemented innovative business models have been analyzed and allocated within the defined solution space. The outcomes of this work offer to potential stakeholders a starting point and guidelines for the business model innovation process, as well as insights for policy makers on challenges and opportunities related to Local Energy Management concepts.

  16. Information Security Policy Modeling for Network Security Systems

    Directory of Open Access Journals (Sweden)

    Dmitry Sergeevich Chernyavskiy

    2014-12-01

    Full Text Available Policy management for network security systems (NSSs is one of the most topical issues of network security management. Incorrect configurations of NSSs lead to system outages and appearance of vulnerabilities. Moreover, policy management process is a time-consuming task, which includes significant amount of manual work. These factors reduce efficiency of NSSs’ utilization. The paper discusses peculiarities of policy management process and existing approaches to policy modeling, presents a model aimed to formalize policies for NSSs independently on NSSs’ platforms and select the most effective NSSs for implementation of the policies.

  17. Developing economic order quantity model for non-instantaneous deteriorating items in vendor-managed inventory (VMI) system

    Science.gov (United States)

    Tat, Roya; Allah Taleizadeh, Ata; Esmaeili, Maryam

    2015-05-01

    This paper develops an economic order quantity model for non-instantaneous deteriorating items with and without shortages to investigate the performance of the vendor-managed inventory (VMI) system. This model is developed for a two-level supply chain consisting of a single supplier and single retailer with a single non-instantaneous deteriorating item. A numerical example and sensitivity analysis are provided to illustrate how increasing or reducing the related parameters change the optimal values of the decision variables of the two proposed models. The results show that VMI works better and charges lower cost in all conditions.

  18. Development of accounting quality management system

    Directory of Open Access Journals (Sweden)

    Plakhtii T.F.

    2017-08-01

    Full Text Available Accounting organization as one of the types of practical activities at the enterprise involves organization of the process of implementation of various kinds of accounting procedures to ensure meeting needs of the users of accounting information. Therefore, to improve its quality an owner should use tools, methods and procedures that enable to improve the quality of implementation of accounting methods and technology. The necessity of using a quality management system for the improvement of accounting organization at the enterprise is substantiated. The system of accounting quality management is developed and grounded in the context of ISO 9001:2015, which includes such processes as the processes of the accounting system, leadership, planning, and evaluation. On the basis of specification and justification of the set of universal requirements (content requirements, formal requirements the model of the environment of demands for high-quality organization of the computerized accounting system that improves the process of preparing high quality financial statements is developed. In order to improve the system of accounting quality management, to justify the main objectives of its further development, namely elimination of unnecessary characteristics of accounting information, the differences between the current level of accounting information quality and its perfect level are considered; the meeting of new needs of users of accounting information that have not been satisfied yet. The ways of leadership demonstration in the system of accounting quality management of accounting subjects at the enterprise are substantiated. The relationship between the current level of accounting information quality and its perfect level is considered. The possible types of measures aimed at improving the system of accounting quality management are identified. The paper grounds the need to include the principle of proper management in the current set of accounting

  19. A system dynamics simulation model for sustainable water resources management and agricultural development in the Volta River Basin, Ghana.

    Science.gov (United States)

    Kotir, Julius H; Smith, Carl; Brown, Greg; Marshall, Nadine; Johnstone, Ron

    2016-12-15

    In a rapidly changing water resources system, dynamic models based on the notion of systems thinking can serve as useful analytical tools for scientists and policy-makers to study changes in key system variables over time. In this paper, an integrated system dynamics simulation model was developed using a system dynamics modelling approach to examine the feedback processes and interaction between the population, the water resource, and the agricultural production sub-sectors of the Volta River Basin in West Africa. The objective of the model is to provide a learning tool for policy-makers to improve their understanding of the long-term dynamic behaviour of the basin, and as a decision support tool for exploring plausible policy scenarios necessary for sustainable water resource management and agricultural development. Structural and behavioural pattern tests, and statistical test were used to evaluate and validate the performance of the model. The results showed that the simulated outputs agreed well with the observed reality of the system. A sensitivity analysis also indicated that the model is reliable and robust to uncertainties in the major parameters. Results of the business as usual scenario showed that total population, agricultural, domestic, and industrial water demands will continue to increase over the simulated period. Besides business as usual, three additional policy scenarios were simulated to assess their impact on water demands, crop yield, and net-farm income. These were the development of the water infrastructure (scenario 1), cropland expansion (scenario 2) and dry conditions (scenario 3). The results showed that scenario 1 would provide the maximum benefit to people living in the basin. Overall, the model results could help inform planning and investment decisions within the basin to enhance food security, livelihoods development, socio-economic growth, and sustainable management of natural resources. Copyright © 2016 Elsevier B.V. All

  20. Learning Content Management Systems

    Directory of Open Access Journals (Sweden)

    Tache JURUBESCU

    2008-01-01

    Full Text Available The paper explains the evolution of e-Learning and related concepts and tools and its connection with other concepts such as Knowledge Management, Human Resources Management, Enterprise Resource Planning, and Information Technology. The paper also distinguished Learning Content Management Systems from Learning Management Systems and Content Management Systems used for general web-based content. The newest Learning Content Management System, very expensive and yet very little implemented is one of the best tools that helps us to cope with the realities of the 21st Century in what learning concerns. The debates over how beneficial one or another system is for an organization, can be driven by costs involved, efficiency envisaged, and availability of the product on the market.

  1. Modeling for the management of peak loads on a radiology image management network

    International Nuclear Information System (INIS)

    Dwyer, S.J.; Cox, G.G.; Templeton, A.W.; Cook, L.T.; Anderson, W.H.; Hensley, K.S.

    1987-01-01

    The design of a radiology image management network for a radiology department can now be assisted by a queueing model. The queueing model requires that the designers specify the following parameters: the number of tasks to be accomplished (acquisition of image data, transmission of data, archiving of data, displaying and manipulation of data, and generation of hard copies); the average times to complete each task; the patient scheduled arrival times; and the number/type of computer nodes interfaced to the network (acquisition nodes, interactive diagnostic display stations, archiving nodes, hard copy nodes, and gateways to hospital systems). The outcomes from the queuering model include mean throughput data rates and identified bottlenecks, and peak throughput data rates and identified bottlenecks. This exhibit presents the queueing model and illustrates its use in managing peak loads on an image management network

  2. Modelling nutrient management in tropical cropping systems

    OpenAIRE

    Delve, R. (ed.); Probert, M. (ed.)

    2004-01-01

    Metadata only record In tropical regions, organic materials are often more important than fertilizers in maintaining soil fertility, yet fertilizer recommendations and most crop models are unable to take account of the level and quality of organic inputs that farmers use. Computer simulation models, such as the Agricultural Production Systems Simulator (APSIM) developed by CSIRO and the Queensland Department of Primary Industries, have proven their value in many cropping environments. Thes...

  3. Social Responsibility as a Management Control System

    National Research Council Canada - National Science Library

    Barger, Anthony

    2004-01-01

    In this report, the authors examine how businesses with social responsibility as part of their core strategy use related management control systems within the business strategy control model set forth...

  4. Lighting system with thermal management system

    Science.gov (United States)

    Arik, Mehmet; Weaver, Stanton; Stecher, Thomas; Seeley, Charles; Kuenzler, Glenn; Wolfe, Jr., Charles; Utturkar, Yogen; Sharma, Rajdeep; Prabhakaran, Satish; Icoz, Tunc

    2013-05-07

    Lighting systems having unique configurations are provided. For instance, the lighting system may include a light source, a thermal management system and driver electronics, each contained within a housing structure. The light source is configured to provide illumination visible through an opening in the housing structure. The thermal management system is configured to provide an air flow, such as a unidirectional air flow, through the housing structure in order to cool the light source. The driver electronics are configured to provide power to each of the light source and the thermal management system.

  5. Occupational health management system: A study of expatriate construction professionals.

    Science.gov (United States)

    Chan, I Y S; Leung, M Y; Liu, A M M

    2016-08-01

    Due to its direct impact on the safety and function of organizations, occupational health has been a concern of the construction industry for many years. The inherent complexity of occupational health management presents challenges that make a systems approach essential. From a systems perspective, health is conceptualized as an emergent property of a system in which processes operating at the individual and organizational level are inextricably connected. Based on the fundamental behavior-to-performance-to-outcome (B-P-O) theory of industrial/organizational psychology, this study presents the development of an I-CB-HP-O (Input-Coping Behaviors-Health Performance-Outcomes) health management systems model spanning individual and organizational boundaries. The model is based on a survey of Hong Kong expatriate construction professionals working in Mainland China. Such professionals tend to be under considerable stress due not only to an adverse work environment with dynamic tasks, but also the need to confront the cross-cultural issues arising from expatriation. A questionnaire was designed based on 6 focus groups involving 44 participants, and followed by a pilot study. Of the 500 questionnaires distributed in the main study, 137 valid returns were received, giving a response rate of 27.4%. The data were analyzed using statistical techniques such as factor analysis, reliability testing, Pearson correlation analysis, multiple regression modeling, and structural equation modeling. Theories of coping behaviors and health performance tend to focus on the isolated causal effects of single factors and/or posits the model at single, individual level; while industrial practices on health management tend to focus on organizational policy and training. By developing the I-CB-HP-O health management system, incorporating individual, interpersonal, and organizational perspectives, this study bridges the gap between theory and practice while providing empirical support for a

  6. Decision Support System for Reservoir Management and Operation in Africa

    Science.gov (United States)

    Navar, D. A.

    2016-12-01

    Africa is currently experiencing a surge in dam construction for flood control, water supply and hydropower production, but ineffective reservoir management has caused problems in the region, such as water shortages, flooding and loss of potential hydropower generation. Our research aims to remedy ineffective reservoir management by developing a novel Decision Support System(DSS) to equip water managers with a technical planning tool based on the state of the art in hydrological sciences. The DSS incorporates a climate forecast model, a hydraulic model of the watershed, and an optimization model to effectively plan for the operation of a system of cascade large-scale reservoirs for hydropower production, while treating water supply and flood control as constraints. Our team will use the newly constructed hydropower plants in the Omo Gibe basin of Ethiopia as the test case. Using the basic HIDROTERM software developed in Brazil, the General Algebraic Modeling System (GAMS) utilizes a combination of linear programing (LP) and non-linear programming (NLP) in conjunction with real time hydrologic and energy demand data to optimize the monthly and daily operations of the reservoir system. We compare the DSS model results with the current reservoir operating policy used by the water managers of that region. We also hope the DSS will eliminate the current dangers associated with the mismanagement of large scale water resources projects in Africa.

  7. Development of personnel exposure management system with personal computer

    International Nuclear Information System (INIS)

    Yamato, Ichiro; Yamamoto, Toshiki

    1992-01-01

    In nuclear power plants, large scale personnel exposure management systems have been developed and established by utilities. Though being common in the base, the implementations are specific by plants. Contractors must control their workers' exposures by their own methods and systems. To comply with the utilities' parental systems, contractors' systems tend to differ by plants, thus make it difficult for contractors to design a standard system that is common to all relevant plants. Circumstances being as such, however, we have developed a system which is applicable to various customer utilities with minimal variations, using personal computers with database management and data communication softwares, with relatively low cost. We hope that this system will develop to the standard model for all Japanese contractors' personnel exposure management systems. (author)

  8. Energy Storage Management in Grid Connected Solar Photovoltaic System

    OpenAIRE

    Vidhya M.E

    2015-01-01

    The penetration of renewable sources in the power system network in the power system has been increasing in the recent years. One of the solutions being proposed to improve the reliability and performance of these systems is to integrate energy storage device into the power system network. This paper discusses the modeling of photo voltaic and status of the storage device such as lead acid battery for better energy management in the system. The energy management for the grid conne...

  9. Managing hybrid marketing systems.

    Science.gov (United States)

    Moriarty, R T; Moran, U

    1990-01-01

    As competition increases and costs become critical, companies that once went to market only one way are adding new channels and using new methods - creating hybrid marketing systems. These hybrid marketing systems hold the promise of greater coverage and reduced costs. But they are also hard to manage; they inevitably raise questions of conflict and control: conflict because marketing units compete for customers; control because new indirect channels are less subject to management authority. Hard as they are to manage, however, hybrid marketing systems promise to become the dominant design, replacing the "purebred" channel strategy in all kinds of businesses. The trick to managing the hybrid is to analyze tasks and channels within and across a marketing system. A map - the hybrid grid - can help managers make sense of their hybrid system. What the chart reveals is that channels are not the basic building blocks of a marketing system; marketing tasks are. The hybrid grid forces managers to consider various combinations of channels and tasks that will optimize both cost and coverage. Managing conflict is also an important element of a successful hybrid system. Managers should first acknowledge the inevitability of conflict. Then they should move to bound it by creating guidelines that spell out which customers to serve through which methods. Finally, a marketing and sales productivity (MSP) system, consisting of a central marketing database, can act as the central nervous system of a hybrid marketing system, helping managers create customized channels and service for specific customer segments.

  10. The influence of enterprise resource planning (ERP) systems' performance on earnings management

    Science.gov (United States)

    Tsai, Wen-Hsien; Lee, Kuen-Chang; Liu, Jau-Yang; Lin, Sin-Jin; Chou, Yu-Wei

    2012-11-01

    We analyse whether there is a linkage between performance measures of enterprise resource planning (ERP) systems and earnings management. We find that earnings management decreases with the higher performance of ERP systems. The empirical result is as expected. We further analyse how the dimension of the DeLone and McLean model of information systems success affects earnings management. We find that the relationship between the performance of ERP systems and earnings management depends on System Quality after ERP implementation. The more System Quality improves, the more earnings management is reduced.

  11. Social Capital, IT Capability, and the Success of Knowledge Management Systems

    Directory of Open Access Journals (Sweden)

    Irene Y.L. Chen

    2009-03-01

    Full Text Available Many organizations have implemented knowledge management systems to support knowledge management. However, many of such systems have failed due to the lack of relationship networks and IT capability within organizations. Motivated by such concerns, this paper examines the factors that may facilitate the success of knowledge management systems. The ten constructs derived from social capital theory, resource-based view and IS success model are integrated into the current research model. Twenty-one hypotheses derived from the research model are empirically validated using a field survey of KMS users. The results suggest that social capital and organizational IT capability are important preconditions of the success of knowledge management systems. Among the posited relationships, trust, social interaction ties, IT capability do not significantly impact service quality, system quality and IT capability, respectively. Against prior expectation, service quality and knowledge quality do not significantly influence perceived KMS benefits and user satisfaction, respectively. Discussion of the results and conclusion are provided. This study then provides insights for future research avenue.

  12. A Road Map for Knowledge Management Systems Design Using Axiomatic Design Approach

    Directory of Open Access Journals (Sweden)

    Houshmand Mahmoud

    2017-01-01

    Full Text Available Successful design and implementation of knowledge management systems have been the main concern of many researchers. It has been reported that more than 50% of knowledge management systems have failed, therefore, it is required to seek for a new and comprehensive scientific approach to design and implement it. In the design and implementation of a knowledge management system, it is required to know ’what we want to achieve’ and ’how and by what processes we will achieve it’. A literature review conducted and axiomatic design theory selected for this purpose. For the first time, this paper develops a conceptual design of knowledge management systems by means of a hierarchical structure, composed of ’Functional Requirements’ (FRs, ’Design Parameters’ (DPs, and ’Process Variables’ (PVs. The intersection of several studies conducted in the field of knowledge management systems has been used to design the knowledge management model. It reveals that six essential bases of knowledge management are organizational culture, organizational structure, human resources, management and leadership, information technology, and the external environment of the organization; that are represented as top DPs in the structure of the model. These essential factors are decomposed to lower levels by means of zigzagging. The model implemented in Tehran Urban and Suburban Railway Operation Corporation (TUSROC and the results were very promising. The most important result of this study is a roadmap to design successful and efficient knowledge management systems.

  13. Risk Management of Large RC Structures within Spatial Information System

    DEFF Research Database (Denmark)

    Qin, Jianjun; Faber, Michael Havbro

    2012-01-01

    Abstract: The present article addresses the development of a spatial information system (SIS), which aims to facilitate risk management of large‐scale concrete structures. The formulation of the SIS is based on ideas developed in the context of indicator‐based risk modeling for concrete structures...... subject to corrosion and geographical information system based risk modeling concerning large‐scale risk management. The term “risk management” here refers in particular to the process of condition assessment and optimization of the inspection and repair activities. The SIS facilitates the storage...... and handling of all relevant information to the risk management. The probabilistic modeling utilized in the condition assessment takes basis in a Bayesian hierarchical modeling philosophy. It facilitates the updating of risks as well as optimizing inspection plans whenever new information about the condition...

  14. Simulation of operating rules and discretional decisions using a fuzzy rule-based system integrated into a water resources management model

    Science.gov (United States)

    Macian-Sorribes, Hector; Pulido-Velazquez, Manuel

    2013-04-01

    Water resources systems are operated, mostly, using a set of pre-defined rules not regarding, usually, to an optimal allocation in terms of water use or economic benefits, but to historical and institutional reasons. These operating policies are reproduced, commonly, as hedging rules, pack rules or zone-based operations, and simulation models can be used to test their performance under a wide range of hydrological and/or socio-economic hypothesis. Despite the high degree of acceptation and testing that these models have achieved, the actual operation of water resources systems hardly follows all the time the pre-defined rules with the consequent uncertainty on the system performance. Real-world reservoir operation is very complex, affected by input uncertainty (imprecision in forecast inflow, seepage and evaporation losses, etc.), filtered by the reservoir operator's experience and natural risk-aversion, while considering the different physical and legal/institutional constraints in order to meet the different demands and system requirements. The aim of this work is to expose a fuzzy logic approach to derive and assess the historical operation of a system. This framework uses a fuzzy rule-based system to reproduce pre-defined rules and also to match as close as possible the actual decisions made by managers. After built up, the fuzzy rule-based system can be integrated in a water resources management model, making possible to assess the system performance at the basin scale. The case study of the Mijares basin (eastern Spain) is used to illustrate the method. A reservoir operating curve regulates the two main reservoir releases (operated in a conjunctive way) with the purpose of guaranteeing a high realiability of supply to the traditional irrigation districts with higher priority (more senior demands that funded the reservoir construction). A fuzzy rule-based system has been created to reproduce the operating curve's performance, defining the system state (total

  15. Quality management system in Nuclear Medicine

    International Nuclear Information System (INIS)

    Peña Tornet, Adela; Torres Aroche, Leonel A.

    2016-01-01

    Establishing Management Systems (QMS) in services Nuclear Medicine (NM) is a prerequisite for optimizing the efficacy and safety of diagnostic and therapeutic procedures of this specialty and increase steadily the quality of the services provide patients. Several international organizations such as the IAEA and scientific specialty societies (SNM, EBNM, etc) and national bodies stimulate and enhance their introduction; in our country is also a requirement of the National Nuclear Safety Centre (CNSN). Are presented in this paper, the main experiences of our country related to the implementation of QMS and developed tools for achieving this goal, such as: The QNUMED automated web environment for managing indicators and documentation format digital; b) The development of prototypes and models for the implementation of the documentation system; d) requirements applying QUANUM in conducting audits of quality management in local services including QUANUM T ool tool; and f) human resource development issues in Quality Management. (author)

  16. Use of logic flowgraph models in a computer aided process analysis and management system

    International Nuclear Information System (INIS)

    Guarro, S.B.; Okrent, D.

    1985-07-01

    The development of a multi-function computer-aided process analysis and management (CAPAM) system, to be implemented in nuclear power plant control rooms, is proposed and discussed. The design goals identified for such a system are early disturbance detection and diagnosis, accompanied by identification of the best possible recovery actions or alternative success paths. The CAPAM structure is articulated in three functional levels with dedicated CRT displays. Increasing amount of diagnostic or recovery information is made available to the operators at the lower display levels. Probabilistic safety margins to the loss of important safety functions may be also calculated. The proposed implementation of the CAPAM concept is based on the use of logic flowgraph networks for the more detailed system modeling. Examples of such an implementation are given. 7 refs., 3 figs., 2 tabs

  17. Decision Making Based On Management Information System and Decision Support System

    Directory of Open Access Journals (Sweden)

    Şükrü Ada

    2015-04-01

    Full Text Available Information hasbecome an essentialresource for managing modern organizations. This is so because today’sbusiness environment is volatile, dynamic, turbulent and necessitates the burgeoning demand for accurate, relevant, complete,timely and economical information needed to drive the decision-making process in order to accentuate organizational abilities to manage opportunities and threat. MIS work on online mode with an average processing speed. Generally, it is used by low level management. Decision support system are powerful tool that assist corporate executives, administrators and other senior officials in making decision regarding the problem. Management Information Systems is a useful tool that provided organized and summarized information in a proper time to decision makers and enable making accurate decision for managers in organizations. This paper will discuss the concept, characteristics, types of MIS, the MIS model, and in particular it will highlight the impact and role of MIS on decision making.

  18. Information Security Management - Part Of The Integrated Management System

    Science.gov (United States)

    Manea, Constantin Adrian

    2015-07-01

    The international management standards allow their integrated approach, thereby combining aspects of particular importance to the activity of any organization, from the quality management systems or the environmental management of the information security systems or the business continuity management systems. Although there is no national or international regulation, nor a defined standard for the Integrated Management System, the need to implement an integrated system occurs within the organization, which feels the opportunity to integrate the management components into a cohesive system, in agreement with the purpose and mission publicly stated. The issues relating to information security in the organization, from the perspective of the management system, raise serious questions to any organization in the current context of electronic information, reason for which we consider not only appropriate but necessary to promote and implement an Integrated Management System Quality - Environment - Health and Operational Security - Information Security

  19. DOE systems approach to a low-level waste management information system: summary paper

    International Nuclear Information System (INIS)

    Esparza, V.

    1987-01-01

    The LLWMP is performing an assessment of waste information systems currently in use at each DOE site for recording LLW data. The assessment is being conducted to determine what changes to the waste information systems, if any, are desirable to support implementation of this systems approach to LLW management. Recommendations will be made to DOE from this assessment and what would be involved to modify current DOE waste generator information practices to support an appropriately structured overall DOE LLW data systems. In support of reducing the uncertainty of decision-making, DOE has selected a systems approach to keep pace with an evolving regulatory climate to low-level waste. This approach considers the effects of each stage of the entire low-level waste management process. The proposed systems approach starts with the disposal side of the waste management system and progresses towards the waste generation side of the waste management system. Using this approach provides quantitative performance to be achieved. In addition, a systems approach also provides a method for selecting appropriate technology based on engineering models

  20. Continuous improvement of the BNFL transport integrated management system

    International Nuclear Information System (INIS)

    Hale, J.A.

    1998-01-01

    The integrated Management System of BNFL Transport and Pacific Nuclear Transport Limited (PNTL) is subject to continuous improvement by the application of established improvement techniques adopted by BNFL. The technique currently being used is the application of a Total Quality Management (TQM) philosophy, involving the identification of key processes, benchmarking against existing measures, initiating various improvement projects and applying process changes within the Company. The measurement technique being used is based upon the European Foundation for Quality Management Model (EFQM). A major initiative was started in 1996 to include the requirements of the Environmental Management Systems standard ISO 14001 within the existing integrated management system. This resulted in additional activities added to the system, modification to some existing activities and additional training for personnel. The system was audited by a third party certification organisation, Lloyds Register Quality Assurance (LRQA), during 1997. This paper describes the arrangements to review and update the integrated management system of BNFL Transport and PNTL to include the requirements of the environmental standard ISO 14001 and it also discusses the continuous improvement process adopted by BNFL Transport. (authors)

  1. Real-Time Vehicle Energy Management System Based on Optimized Distribution of Electrical Load Power

    OpenAIRE

    Yuefei Wang; Hao Hu; Li Zhang; Nan Zhang; Xuhui Sun

    2016-01-01

    As a result of severe environmental pressure and stringent government regulations, refined energy management for vehicles has become inevitable. To improve vehicle fuel economy, this paper presents a bus-based energy management system for the electrical system of internal combustion engine vehicles. Both the model of an intelligent alternator and the model of a lead-acid battery are discussed. According to these models, the energy management for a vehicular electrical system is formulated as ...

  2. Reformulation of Crop and Management Factor in ANSWERS Model

    Directory of Open Access Journals (Sweden)

    Yayat Hidayat

    2008-05-01

    Full Text Available Crop and management factor value is significantly corelated with outputs of ANSWERS model especially on soil erosion. Using daily crop and management factors (daily C factors, the ANSWERS model performs well in predicting soil erosion which is showed by determination coeffient (R2 = 0.89, model efficiency (0.86, and average of percentage model deviations (24.1%. Whereas using USLE C factor (2 cropping systems, predicted is much higher than measured soil erosion (over estimate. Output of the model is not statisfy; it is represented by model coefficient (0.40 and average of percentage model deviations (63.6%.

  3. New type radiation management system

    International Nuclear Information System (INIS)

    Mogi, Kenichi; Uranaka, Yasuo; Fujita, Kazuhiko

    2001-01-01

    The radiation management system is a system to carry out entrance and leaving room management of peoples into radiation management area, information management on radiation obtained from a radiation testing apparatus, and so on. New type radiation management system developed by the Mitsubishi Electric Corp. is designed by concepts of superior maintenance and system practice by using apparatus and its interface with standard specification, upgrading of processing response by separating exposure management processing from radiation monitoring processing on a computer, and a backup system not so as to lose its function by a single accident of the constructed computer. Therefore, the system is applied by the newest hardware, package software, and general use LAN, and can carry out a total system filled with requirements and functions for various radiation management of customers by preparing a basic system from radiation testing apparatus to entrance and leaving room management system. Here were described on outline of the new type management system, concept of the system, and functions of every testing apparatus. (G.K.)

  4. State-of-the-Art Solid Waste Management Life-Cycle Modeling Workshop

    DEFF Research Database (Denmark)

    Damgaard, Anders; Levis, James W.

    There are many alternatives for the management of solid waste including recycling, biological treatment, thermal treatment and landfill disposal. In many cases, solid waste management systems include the use of several of these processes. Solid waste life-cycle assessment models are often used...... to evaluate the environmental consequences of various waste management strategies. The foundation of every life-cycle model is the development and use of process models to estimate the emissions from solid waste unit processes. The objective of this workshop is to describe life-cycle modeling of the solid...... waste processes and systems. The workshop will begin with an introduction to solid waste life-cycle modeling and available models, which will be followed by sessions on life-cycle process modeling for individual processes (e.g., landfills, biological treatment, and thermal treatment). The first part...

  5. ModelHub: Towards Unified Data and Lifecycle Management for Deep Learning

    OpenAIRE

    Miao, Hui; Li, Ang; Davis, Larry S.; Deshpande, Amol

    2016-01-01

    Deep learning has improved state-of-the-art results in many important fields, and has been the subject of much research in recent years, leading to the development of several systems for facilitating deep learning. Current systems, however, mainly focus on model building and training phases, while the issues of data management, model sharing, and lifecycle management are largely ignored. Deep learning modeling lifecycle generates a rich set of data artifacts, such as learned parameters and tr...

  6. Strengthening Performance Management System Implementation in South African Municipalities

    Directory of Open Access Journals (Sweden)

    Malefetsane Mofolo

    2012-06-01

    Full Text Available Adoption of a performance management system in municipalities presented a serious challenge for its implementation. This scenario is implicitly manifesting itself in the reports of the Auditor-General on the financial statements and performance of municipalities, as well as in the state of local government in South Africa overview report (2009. These reports called for the conceptualisation of a model that to strengthen the implementation in municipalities of a performance management system that is efficient and effective. And most importantly, this model could be beneficial for growth, development and effective service delivery.

  7. Smart Building Management Systems and Internet of Things

    Directory of Open Access Journals (Sweden)

    Jean Yves Astier

    2017-07-01

    Full Text Available After a brief historical reminder on SCADA systems, we will present the new challenges regarding modern building technical management (BTM systems. We identify the technological evolutions, which allow us to address these new issues, and describe the software and hardware architectures of our Building Management Internet of Things (BMIoT solution. We end by comparing with other older solutions and by a short description of the new business models, our solution allows.

  8. Evaluating Performance of Safety Management and Occupational Health Using Total Quality Safety Management Model (TQSM

    Directory of Open Access Journals (Sweden)

    E Mohammadfam

    2015-11-01

    Full Text Available Introduction: All organizations, whether public or private, necessitate performance evaluation systems in regard with growth, stability, and development in the competitive fields. One of the existing models for performance evaluation of occupational health and safety management is Total Quality Safety Management model (TQSM. Therefore, the present study aimed to evaluate performance of safety management and occupational health utilizing TQSM model. Methods: In this descriptive-analytic study, the population consisted of 16 individuals, including managers, supervisors, and members of technical protection and work health committee. Then the participants were asked to respond to TQSM questionnaire before and after the implementation of Occupational Health & Safety Advisory Services 18001 (OHSAS18001. Ultimately, the level of each program as well as the TQSM status were determined before and after the implementation of OHSAS18001. Results: The study results showed that the scores obtained by the company before OHSAS 18001’s implementation, was 43.7 out of 312. After implementing OHSAS 18001 in the company and receiving the related certificate, the total score of safety program that company could obtain was 127.12 out of 312 demonstrating a rise of 83.42 scores (26.8%. The paired t-test revealed that mean difference of TQSM scores before and after OHSAS 18001 implementation was proved to be significant (p> 0.05. Conclusion: The study findings demonstrated that TQSM can be regarded as an appropriate model in order to monitor the performance of safety management system and occupational health, since it possesses the ability to quantitatively evaluate the system performance.

  9. Project as a System and its Management

    Directory of Open Access Journals (Sweden)

    Jiří Skalický

    2017-06-01

    Full Text Available The contribution aims to describe project as a system, to define project control goal and strategy, control variables and their relationships. Three common control variables represented by the project triangle, are extended by two other important variables – project risk and quality. The control system consists of two components: social one – project manager and project team – and technical one – project dynamic simulation model as a decision making support of project manager in project milestones. In the project planning phase, the project baseline with planned controlled variables is created. In milestones after project launch, the actual values of these variables are measured. If the actual values deviate from planned ones, corrective actions are proposed and new baseline for the following control interval is created. Project plan takes into account the actual project progress and optimum corrective actions are determined by simulation, respecting control strategy and availability of resources. The contribution presents list of references to articles dealing with project as a system and its simulation. In most cases, they refer to the project control using the Earned Value Management method and its derivatives. Using of the dynamic simulation model for project monitoring and control, suggested in this contribution, presents a novel approach. The proposed model can serve as departure point to future research of authors and for development of appropriate and applicable tool.

  10. THE PLACE OF OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM IN THE INTEGRATED MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Piotr Kafel

    2016-06-01

    Full Text Available The purpose of this paper is to analyze the place of occupational health and safety management system (OHSMS within the integrated management system. Implementation aspects of management systems are discussed, namely the different management system standards used for registration, for example ISO 14001, ISO 9001, OHSAS 18001, ISO 27001, the order in which they were implemented, the time required for each implementation, as well as the scope of integration of these management system standards into a single Integrated Management System and the level of integration. In order to do so, some of the results of a survey carried out in 81 organizations registered to at least two management systems selected from popular international standards, e.g.: ISO 9001, ISO 14001, OHSAS 18001, ISO/IEC 27001, ISO 22000 were used. OHSMS is not the system that is implemented as a first one. Usually it is implemented after or simultaneously with ISO 9001 and ISO 14001 standards. Time of implementation of MSSs in second and further round of implementation is shorter than during the implementation of first standards. There is a higher level of integration of implemented management standards in organizations where one of the standards in OHSMS, than in a companies without OHSMS. The paper analyses those sequences of management systems implementation of safety management systems with other system, that allow organizations to achieve higher levels of integration and presents a possible pattern for the companies initiating the integration process.

  11. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  12. Mathematical modeling in municipal solid waste management: case study of Tehran.

    Science.gov (United States)

    Akbarpour Shirazi, Mohsen; Samieifard, Reza; Abduli, Mohammad Ali; Omidvar, Babak

    2016-01-01

    Solid Waste Management (SWM) in metropolises with systematic methods and following environmental issues, is one of the most important subjects in the area of urban management. In this regard, it is regarded as a legal entity so that its activities are not overshadowed by other urban activities. In this paper, a linear mathematical programming model has been designed for integrated SWM. Using Lingo software and required data from Tehran, the proposed model has been applied for Tehran SWM system as a case study. To determine the optimal status of the available system for Tehran's Solid Waste Management System (SWMS), a novel linear programming model is applied. Tehran has 22 municipal regions with 11 transfer stations and 10 processing units. By running of the model, the transfer stations and processing units are decreased to 10 and 6 units, respectively. The proposed model is an alternative method for improvement the SWMS by decreasing the transfer stations and processing units.

  13. A system dynamics model based on evolutionary game theory for green supply chain management diffusion among Chinese manufacturers

    DEFF Research Database (Denmark)

    Tian, Yihui; Govindan, Kannan; Zhu, Qinghua

    2014-01-01

    In this study, a system dynamics (SD) model is developed to guide the subsidy policies to promote the diffusion of green supply chain management (GSCM) in China. The relationships of stakeholders such as government, enterprises and consumers are analyzed through evolutionary game theory. Finally...

  14. Mechanisms of Resilience in Common-pool Resource Management Systems: an Agent-based Model of Water Use in a River Basin

    Directory of Open Access Journals (Sweden)

    Maja Schlüter

    2007-12-01

    Full Text Available The concept of resilience is widely promoted as a promising notion to guide new approaches to ecosystem and resource management that try to enhance a system's capacity to cope with change. A variety of mechanisms of resilience specific for different systems have been proposed. In the context of resource management those include but are not limited to the diversity of response options and flexibility of the social system to adaptively respond to changes on an adequate scale. However, implementation of resilience-based management in specific real-world systems has often proven difficult because of a limited understanding of suitable interventions and their impact on the resilience of the coupled social-ecological system. We propose an agent-based modeling approach to explore system characteristics and mechanisms of resilience in a complex resource management system, based on a case study of water use in the Amudarya River, which is a semiarid river basin. Water resources in its delta are used to sustain irrigated agriculture as well as aquatic ecosystems that provide fish and other ecosystem services. The three subsystems of the social-ecological system, i.e., the social system, the irrigation system, and an aquatic ecosystem, are linked by resource flows and the allocation decision making of actors on different levels. Simulation experiments are carried out to compare the resilience of different institutional settings of water management to changes in the variability and uncertainty of water availability. The aim is to investigate the influence of (1 the organizational structure of water management, (2 information on water availability, and (3 the diversity of water uses on the resilience of the system to short and long-term water scarcity. In this paper, the model concept and first simulation results are presented. As a first illustration of the approach the performances of a centralized and a decentralized regime are compared under different

  15. A Note on Systems Intelligence in Knowledge Management

    Science.gov (United States)

    Sasaki, Yasuo

    2017-01-01

    Purpose: This paper aims to show that systems intelligence (SI) can be a useful perspective in knowledge management, particularly in the context of the socialization, externalization, combination and internalization (SECI) model. SI is a recently developed systemic concept, a certain kind of human intelligence based on a systems thinking…

  16. The systems integration modeling system

    International Nuclear Information System (INIS)

    Danker, W.J.; Williams, J.R.

    1990-01-01

    This paper discusses the systems integration modeling system (SIMS), an analysis tool for the detailed evaluation of the structure and related performance of the Federal Waste Management System (FWMS) and its interface with waste generators. It's use for evaluations in support of system-level decisions as to FWMS configurations, the allocation, sizing, balancing and integration of functions among elements, and the establishment of system-preferred waste selection and sequencing methods and other operating strategies is presented. SIMS includes major analysis submodels which quantify the detailed characteristics of individual waste items, loaded casks and waste packages, simulate the detailed logistics of handling and processing discrete waste items and packages, and perform detailed cost evaluations

  17. A multi-echelon supply chain model for municipal solid waste management system

    International Nuclear Information System (INIS)

    Zhang, Yimei; Huang, Guo He; He, Li

    2014-01-01

    In this paper, a multi-echelon multi-period solid waste management system (MSWM) was developed by inoculating with multi-echelon supply chain. Waste managers, suppliers, industries and distributors could be engaged in joint strategic planning and operational execution. The principal of MSWM system is interactive planning of transportation and inventory for each organization in waste collection, delivery and disposal. An efficient inventory management plan for MSWM would lead to optimized productivity levels under available capacities (e.g., transportation and operational capacities). The applicability of the proposed system was illustrated by a case with three cities, one distribution and two waste disposal facilities. Solutions of the decision variable values under different significant levels indicate a consistent trend. With an increased significant level, the total generated waste would be decreased, and the total transported waste through distribution center to waste to energy and landfill would be decreased as well

  18. A multi-echelon supply chain model for municipal solid waste management system

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Yimei, E-mail: yimei.zhang1@gmail.com [Energy and Environmental Research Academy, North China Electric Power University, Beijing 102206 (China); Huang, Guo He [Environmental Systems Engineering Program, Faculty of Engineering and Applied Science, University of Regina, Regina, Saskatchewan S4S 0A2 (Canada); He, Li [Energy and Environmental Research Academy, North China Electric Power University, Beijing 102206 (China)

    2014-02-15

    In this paper, a multi-echelon multi-period solid waste management system (MSWM) was developed by inoculating with multi-echelon supply chain. Waste managers, suppliers, industries and distributors could be engaged in joint strategic planning and operational execution. The principal of MSWM system is interactive planning of transportation and inventory for each organization in waste collection, delivery and disposal. An efficient inventory management plan for MSWM would lead to optimized productivity levels under available capacities (e.g., transportation and operational capacities). The applicability of the proposed system was illustrated by a case with three cities, one distribution and two waste disposal facilities. Solutions of the decision variable values under different significant levels indicate a consistent trend. With an increased significant level, the total generated waste would be decreased, and the total transported waste through distribution center to waste to energy and landfill would be decreased as well.

  19. Coupling of a distributed stakeholder-built system dynamics socio-economic model with SAHYSMOD for sustainable soil salinity management - Part 1: Model development

    Science.gov (United States)

    Inam, Azhar; Adamowski, Jan; Prasher, Shiv; Halbe, Johannes; Malard, Julien; Albano, Raffaele

    2017-08-01

    Effective policies, leading to sustainable management solutions for land and water resources, require a full understanding of interactions between socio-economic and physical processes. However, the complex nature of these interactions, combined with limited stakeholder engagement, hinders the incorporation of socio-economic components into physical models. The present study addresses this challenge by integrating the physical Spatial Agro Hydro Salinity Model (SAHYSMOD) with a participatory group-built system dynamics model (GBSDM) that includes socio-economic factors. A stepwise process to quantify the GBSDM is presented, along with governing equations and model assumptions. Sub-modules of the GBSDM, describing agricultural, economic, water and farm management factors, are linked together with feedbacks and finally coupled with the physically based SAHYSMOD model through commonly used tools (i.e., MS Excel and a Python script). The overall integrated model (GBSDM-SAHYSMOD) can be used to help facilitate the role of stakeholders with limited expertise and resources in model and policy development and implementation. Following the development of the integrated model, a testing methodology was used to validate the structure and behavior of the integrated model. Model robustness under different operating conditions was also assessed. The model structure was able to produce anticipated real behaviours under the tested scenarios, from which it can be concluded that the formulated structures generate the right behaviour for the right reasons.

  20. Work injury management model and implication in Hong Kong: a literature review.

    Science.gov (United States)

    Chong, Cecilia Suk-Mei; Cheng, Andy Shu-Kei

    2010-01-01

    The objective of this review is to explore the work injury management models in literatures and the essential components in different models. The resulting information could be used to develop an integrated holistic model that could be applied in the work injury management system in Hong Kong. A keyword search of MEDLINE and CINAHL databases was conducted. A total of 68 studies related to the management of an injury were found within the above mentioned electronic database. Together with the citation tracking, there were 13 studies left for selection after the exclusion screening. Only 7 out of those 13 studies met the inclusion criteria for review. It is noticeable that the most important component in the injury management model in the reviewed literatures is early intervention. Because of limitations in Employees' Compensation Ordinance in Hong Kong, there is an impetus to have a model and practice guideline for work injury management in Hong Kong to ensure the quality of injury management services. At the end of this paper, the authors propose a work injury management model based on the employees' compensation system in Hong Kong. This model can be used as a reference for those countries adopting similar legislation as in Hong Kong.

  1. Learning Management System with Prediction Model and Course-Content Recommendation Module

    Science.gov (United States)

    Evale, Digna S.

    2017-01-01

    Aim/Purpose: This study is an attempt to enhance the existing learning management systems today through the integration of technology, particularly with educational data mining and recommendation systems. Background: It utilized five-year historical data to find patterns for predicting student performance in Java Programming to generate…

  2. Multi-source remote sensing data management system

    International Nuclear Information System (INIS)

    Qin Kai; Zhao Yingjun; Lu Donghua; Zhang Donghui; Wu Wenhuan

    2014-01-01

    In this thesis, the author explored multi-source management problems of remote sensing data. The main idea is to use the mosaic dataset model, and the ways of an integreted display of image and its interpretation. Based on ArcGIS and IMINT feature knowledge platform, the author used the C# and other programming tools for development work, so as to design and implement multi-source remote sensing data management system function module which is able to simply, conveniently and efficiently manage multi-source remote sensing data. (authors)

  3. Online decision support system for surface irrigation management

    Science.gov (United States)

    Wang, Wenchao; Cui, Yuanlai

    2017-04-01

    Irrigation has played an important role in agricultural production. Irrigation decision support system is developed for irrigation water management, which can raise irrigation efficiency with few added engineering services. An online irrigation decision support system (OIDSS), in consist of in-field sensors and central computer system, is designed for surface irrigation management in large irrigation district. Many functions have acquired in OIDSS, such as data acquisition and detection, real-time irrigation forecast, water allocation decision and irrigation information management. The OIDSS contains four parts: Data acquisition terminals, Web server, Client browser and Communication system. Data acquisition terminals are designed to measure paddy water level, soil water content in dry land, ponds water level, underground water level, and canals water level. A web server is responsible for collecting meteorological data, weather forecast data, the real-time field data, and manager's feedback data. Water allocation decisions are made in the web server. Client browser is responsible for friendly displaying, interacting with managers, and collecting managers' irrigation intention. Communication system includes internet and the GPRS network used by monitoring stations. The OIDSS's model is based on water balance approach for both lowland paddy and upland crops. Considering basic database of different crops water demands in the whole growth stages and irrigation system engineering information, the OIDSS can make efficient decision of water allocation with the help of real-time field water detection and weather forecast. This system uses technical methods to reduce requirements of user's specialized knowledge and can also take user's managerial experience into account. As the system is developed by the Browser/Server model, it is possible to make full use of the internet resources, to facilitate users at any place where internet exists. The OIDSS has been applied in

  4. The disruption management model.

    Science.gov (United States)

    McAlister, James

    2011-10-01

    Within all organisations, business continuity disruptions present a set of dilemmas that managers may not have dealt with before in their normal daily duties. The disruption management model provides a simple but effective management tool to enable crisis management teams to stay focused on recovery in the midst of a business continuity incident. The model has four chronological primary headlines, which steer the team through a quick-time crisis decision-making process. The procedure facilitates timely, systematic, rationalised and justified decisions, which can withstand post-event scrutiny. The disruption management model has been thoroughly tested within an emergency services environment and is proven to significantly support clear and concise decision making in a business continuity context.

  5. Design of a dynamic model for nuclear energy management based on European Foundation for Quality Management

    International Nuclear Information System (INIS)

    Fam, I. M.; Shekari, A.

    2008-01-01

    The Business excellence model has been developed to improve and promote business levels. In business excellence model such as European Foundation for Quality Management model, the important role of resource management is emphasizes. In this paper, we have tried with consideration to tendency progressive concepts of nuclear energy management; a dynamic model has been presented for energy management within the scope of European Foundation for Quality Management model. Population growth could cause increasing of the level of energy demands. No doubt, the confidence of this developed phenomenon with the limits of environment will create greater challenges for the world and its inhabitants. Considering the shortage of energy supply all over the world, nuclear energy management has been studied with a view to fourth and fifth criterions included in European Foundation for Quality Management model (Partnership and resource and Process criteria's). In addition to it, a dynamic model has been presented for nuclear energy management within the scope of European Foundation for Quality Management model. In this dynamic model, with differential equation definition for each of the presented communications of defined causal model, input variable impacts on output ones have been determined and considered. They can be reviewed, based on six scenario plans, the importance of nuclear energy management of a business has been properly shown, and similarly the rate of investment on systems as a factor affecting the level of attention paid to the future of business enterprises, has been specified. This paper conceives nuclear energy management as an instrument to contribute to the growth and fall of a business. It is therefore, imperative to attach more importance at nuclear energy demand management in the business and an attempt should be made to keep it under our control

  6. Assessing the role of informal sector in WEEE management systems: A System Dynamics approach.

    Science.gov (United States)

    Ardi, Romadhani; Leisten, Rainer

    2016-11-01

    Generally being ignored by academia and regulators, the informal sector plays important roles in Waste Electrical and Electronic Equipment (WEEE) management systems, especially in developing countries. This study aims: (1) to capture and model the variety of informal operations in WEEE management systems, (2) to capture the dynamics existing within the informal sector, and (3) to assess the role of the informal sector as the key player in the WEEE management systems, influencing both its future operations and its counterpart, the formal sector. By using System Dynamics as the methodology and India as the reference system, this study is able to explain the reasons behind, on the one hand, the superiority of the informal sector in WEEE management systems and, on the other hand, the failure of the formal systems. Additionally, this study reveals the important role of the second-hand market as the determinant of the rise and fall of the informal sector in the future. Copyright © 2015 Elsevier Ltd. All rights reserved.

  7. Energy Systems Modelling Research and Analysis

    DEFF Research Database (Denmark)

    Møller Andersen, Frits; Alberg Østergaard, Poul

    2015-01-01

    This editorial introduces the seventh volume of the International Journal of Sustainable Energy Planning and Management. The volume presents part of the outcome of the project Energy Systems Modelling Research and Analysis (ENSYMORA) funded by the Danish Innovation Fund. The project carried out b...... by 11 university and industry partners has improved the basis for decision-making within energy planning and energy scenario making by providing new and improved tools and methods for energy systems analyses.......This editorial introduces the seventh volume of the International Journal of Sustainable Energy Planning and Management. The volume presents part of the outcome of the project Energy Systems Modelling Research and Analysis (ENSYMORA) funded by the Danish Innovation Fund. The project carried out...

  8. Use of the environmental resource management and analysis system at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Erjavec, J.L.

    1992-01-01

    In the past, hazardous waste site characterization and remediation using computer-based technologies has been a difficult and time-consuming process because of the need to analyze data using non-interfaced computer and software environments. The Environmental Resource Management and Analysis System (ERMA) was developed as an innovative approach to the management, analyses and depiction of data collected during a hazardous site remediation. A modular, multi-disciplined software package, ERMA integrates an environmental database management system with variety of Geographic Information System technologies. ERMA capabilities include spatial analysis, three-dimensional subsurface geologic interpretation and modeling, terrain modeling, and groundwater flow and contaminant transport modeling. ERMA's data management is provided through a set of user-modifiable, graphic interface tools that permit complex data queries, data modification and reporting. An ERMA prototype has been implemented at the Fernald Environmental Management Project (a Department of Energy cleanup site) using groundwater monitoring and elevation data collected over the last few years. ERMA has enabled the precision posting of data from the 853 groundwater monitoring wells at the site. Data from these wells have ben used to define the piezometric surface of the Great Miami Aquifer and correlate it with the uranium concentration contours of an identified groundwater plume. Using spatial query capabilities, radioactive sampling results from monitoring wells have been compared to contour maps defining the extent of the plume to determine the validity of those maps and the need for additional well locations

  9. The Effects of Modern-Day Cropland and Pasture Management on Vegetation Fire: An Earth System Modeling Approach

    Science.gov (United States)

    Rabin, S. S.; Malyshev, S.; Shevliakova, E.; Pacala, S. W.

    2014-12-01

    Fire is a major component of the global carbon cycle, with some estimates of the associated emissions reaching 2.5 PgC/yr. This and the other impacts of biomass burning have driven efforts to improve its simulation in Earth system models. Recent global fire models usually include both bioclimatic and anthropogenic drivers of fire, with the latter (via population density and sometimes economic status) serving to increase or suppress burned area. Some models have added the representation of fire used in deforestation and cropland management, the extent and seasonal timing of which may not be accounted for by the usual approach to anthropogenic influence. Human land use can also limit fire by fragmenting landscapes, but this process is not included in most global models. Moreover, although people often use fire to manage grazing lands for livestock, these practices have not been explicitly modeled (except as performed by pre-industrial societies). This could be important for regions such as sub-Saharan Africa, where the seasonality of pasture burning tends to differ from that of other lands, potentially influencing savanna-forest dynamics. Recent efforts elucidating the effects of cropland and pasture on fire regimes at regional scales provide insight into these processes. Using this new understanding, we have developed a fire model with structurally distinct modules for burning of croplands, pasture, and primary and secondary lands, as well as fire use for deforestation. Parameters for each are rigorously constrained using remote-sensing observations of burned area. This structure allows us to disentangle agricultural practices and fragmentation effects from the endogenous processes driving fire on non-agricultural land, resulting in a better ability to simulate how fire works at large scales. This is critical for modeling the future of fire and all the parts of the Earth system that it affects, including vegetation distributions, nutrient cycling, and biosphere

  10. Resilience Attributes of Social-Ecological Systems: Framing Metrics for Management

    Directory of Open Access Journals (Sweden)

    David A. Kerner

    2014-12-01

    Full Text Available If resilience theory is to be of practical value for policy makers and resource managers, the theory must be translated into sensible decision-support tools. We present herein a set of resilience attributes, developed to characterize human-managed systems, that helps system stakeholders to make practical use of resilience concepts in tangible applications. In order to build and maintain resilience, these stakeholders must be able to understand what qualities or attributes enhance—or detract from—a system’s resilience. We describe standardized resilience terms that can be incorporated into resource management plans and decision-support tools to derive metrics that help managers assess the current resilience status of their systems, make rational resource allocation decisions, and track progress toward meeting goals. Our intention is to provide an approachable set of terms for both specialists and non-specialists alike to apply to programs that would benefit from a resilience perspective. These resilience terms can facilitate the modeling of resilience behavior within systems, as well as support those lacking access to sophisticated models. Our goal is to enable policy makers and resource managers to put resilience theory to work in the real world.

  11. International safeguards data management system

    International Nuclear Information System (INIS)

    Argentesi, F.; Costantini, L.; Franklin, M.; Dondi, M.G.

    1981-01-01

    The data base management system ''ISADAM'' (i.e. International Safeguards Data Management System) described in this report is intended to facilitate the safeguards authority in making efficient and effective use of accounting reports. ISADAM has been developed using the ADABAS data base management system and is implemented on the JRC-Ispra computer. The evaluation of safeguards declarations focuses on three main objectives: - the requirement of syntactical consistency with the legal conventions of data recording for safeguards accountancy; - the requirement of accounting evidence that there is no material unaccounted for (MUF); - the requirement of semantic consistency with the technological characteristics of the plant and the processing plans of the operator. Section 2 describes in more detail the facilities which ISADAM makes available to a safeguards inspector. Section 3 describes how the MUF variance computation is derived from models of measurement error propagation. Many features of the ISADAM system are automatically provided by ADABAS. The exceptions to this are the utility software designed to: - screen plant declarations before loading into the data base, - prepare variance summary files designed to support real-time computation of MUF and variance of MUF, - provide analyses in response to user requests in interactive or batch mode. Section 4 describes the structure and functions of this software which have been developed by JRC-Ispra

  12. Incorporating co-management within your environmental management system

    International Nuclear Information System (INIS)

    Melton, D.A.; Maher, S.

    1998-01-01

    The meaning of co-management in the renewable resource sector in terms of government and First Nations relations was explained. Co-management is a short term for co-operative management and has a formative history in the Northwest Territories, particularly in wildlife management. For example, co-management bridged the gap between the aboriginal way of hunting with those of the government. The aboriginal system was associated by self regulation based on traditional knowledge whereas the government system emphasized science, laws and regulations. At present, there are few examples of co-management in the oil and gas sector. This paper described the lessons that could be learned from previous examples of co-management and how those lessons might apply to an Environmental Management System (EMS) for the private oil and gas sector. 3 refs

  13. Model predictive control of urban drainage systems: A review and perspective towards smart real-time water management

    DEFF Research Database (Denmark)

    Lund, Nadia Schou Vorndran; Falk, Anne Katrine Vinther; Borup, Morten

    2018-01-01

    Model predictive control (MPC) can be used to manage combined urban drainage systems more efficiently for protection of human health and the environment, but examples of operational implementations are rare. This paper reviews more than 30 years of partly heterogeneous research on the topic. We...... propose a terminology for MPC of urban drainage systems and a hierarchical categorization where we emphasize four overall components: the “receding horizon principle”, the “optimization model”, the “optimization solver”, and the “internal MPC model”. Most of the reported optimization models share...... of the components in the receding horizon principle. The large number of MPC formulations and evaluation approaches makes it problematic to compare different MPC methods. This review highlights methods, challenges, and research gaps in order to make MPC of urban drainage systems accessible for researchers...

  14. CSNS control cable information management system based on web

    International Nuclear Information System (INIS)

    Lu Huihui; Wang Chunhong; Li Luofeng; Liu Zhengtong; Lei Bifeng

    2014-01-01

    This paper presents an approach to data modeling a great number of control devices and cables with complicated relations of CSNS (China Spallation Neutron Source). The CSNS accelerator control cable database was created using MySQL, and the control cable information management system based on Web was further built. During the development of the database, the design idea of IRMIS database was studied. and the actual situation of CSNS accelerator control cables was investigated. The control cable database model fitting the requirements was designed. This system is of great convenience to manage and maintain CSNS control devices and cables in the future. (authors)

  15. A multi-echelon supply chain model for municipal solid waste management system.

    Science.gov (United States)

    Zhang, Yimei; Huang, Guo He; He, Li

    2014-02-01

    In this paper, a multi-echelon multi-period solid waste management system (MSWM) was developed by inoculating with multi-echelon supply chain. Waste managers, suppliers, industries and distributors could be engaged in joint strategic planning and operational execution. The principal of MSWM system is interactive planning of transportation and inventory for each organization in waste collection, delivery and disposal. An efficient inventory management plan for MSWM would lead to optimized productivity levels under available capacities (e.g., transportation and operational capacities). The applicability of the proposed system was illustrated by a case with three cities, one distribution and two waste disposal facilities. Solutions of the decision variable values under different significant levels indicate a consistent trend. With an increased significant level, the total generated waste would be decreased, and the total transported waste through distribution center to waste to energy and landfill would be decreased as well. Copyright © 2013 Elsevier Ltd. All rights reserved.

  16. Life Cycle Assessment Modelling of Greenhouse Gas Emissions from Existing and Proposed Municipal Solid Waste Management System of Lahore, Pakistan

    Directory of Open Access Journals (Sweden)

    Adila Batool Syeda

    2017-12-01

    Full Text Available Open Dumping of indiscriminate municipal solid waste (MSW remarkably contributes to global warming (GW. Life Cycle Assessment modelling may be a useful tool for assessing the best waste management option regarding GW potential. The current study evaluates the contribution of an existing MSW management (MSWM system to greenhouse gases in Gulberg Town, Lahore, Pakistan. This research also presents a comparison of scenarios with different waste management options. Life Cycle Assessment methodology has been used to conduct the study. EASETECH has been used for modelling. The short-term scenarios (STSs have been developed to promote the thinking of integration of treatment technologies in the current waste management system within a few months. The results show that the major contribution to the total emissions comes from the anaerobic digestion of organic material from open waste dumps. Currently, recycling is the best treatment option for reducing the CO2-eq values in the study area. It was clarified that recycling is the best option for reducing the CO2-eq values, whereas biogasification comes in second in terms of savings and reduction. The integration of recycling and biogasification techniques would be a good solution.

  17. Analysis of the Effect of Information System Quality to Intention to Reuse of Employee Management Information System (Simpeg Based on Information Systems Success Model

    Directory of Open Access Journals (Sweden)

    Suryanto Tri Lathif Mardi

    2016-01-01

    Full Text Available This study examines the effect of Information Quality, Systems Quality and Service Quality on the user intention to reuse Employee Management Information System (SIMPEG in University in the city of Surabaya, based on the theoretical foundation of DeLone and McLane Information Systems Success (ISS Model. The distribution of questionnaire was conducted to 120 employees of different universities by means of stratified random sampling. The results showed that: (1 there is a significant positive effect of the System Quality on the Quality of Information, (2 there is a significant positive effect of the Information Quality on the Intention to Reuse, information related to the fulfillment of the user’s needs; (3 there is a significant positive effect of the Quality of the Intention on system re-use, the system related to the fulfillment of the needs of users; (4 there is no effect of the Quality of Service to the Intention to Reuse. In the end, the results of this study provide an analysis and advice to The University officials that can be used as a consideration for Information Technology/Information System investment and development in accordance with the Success of Information System and Intention to Reuse model.

  18. Dynamic modeling of the INAPRO aquaponic system

    NARCIS (Netherlands)

    Karimanzira, Divas; Keesman, Karel J.; Kloas, Werner; Baganz, Daniela; Rauschenbach, Thomas

    2016-01-01

    The use of modeling techniques to analyze aquaponics systems is demonstrated with an example of dynamic modeling for the production of Nile tilapia (Oreochromis niloticus) and tomatoes (Solanum lycopersicon) using the innovative double recirculating aquaponic system ASTAF-PRO. For the management

  19. Integrating school-based and therapeutic conflict management models at schools.

    Science.gov (United States)

    D'Oosterlinck, Franky; Broekaert, Eric

    2003-08-01

    Including children with emotional and behavioral needs in mainstream school systems leads to growing concern about the increasing number of violent and nonviolent conflicts. Schools must adapt to this evolution and adopt a more therapeutic dimension. This paper explores the possibility of integrating school-based and therapeutic conflict management models and compares two management models: a school-based conflict management program. Teaching Students To Be Peacemakers; and a therapeutic conflict management program, Life Space Crisis Intervention. The authors conclude that integration might be possible, but depends on establishing a positive school atmosphere, the central position of the teacher, and collaborative and social learning for pupils. Further implementation of integrated conflict management models can be considered but must be underpinned by appropriate scientific research.

  20. Regional integrated solid waste management: an optimization model for northern Lebanon

    International Nuclear Information System (INIS)

    Abou Najm, M.; El Fadel, M.; El-Taha, M.; Ayoub, G.; Al-Awar

    2000-01-01

    Full text.Increased environmental concerns and the emphasis on material and energy recovery are gradually changing the orientation of municipal solid waste (MSW) management and planning. In this context, the application of optimization techniques have been introduced to design the least cost solid waste management systems, considering the variety of management processes (recycling, composting, anaerobic digestion, incineration and land filling) and the existence of uncertainties associated with the number of system components and their interrelations. This study presents a model that was developed and applied to serve as a solid socio-economic and environmental considerations. The model accounts for solid waste generation rates, composition, collection, treatment, disposal as well as potential environmental impacts of various MSW management techniques. The model follows a linear programming formulation with the framework of dynamic optimization. The model can serve as a tool to evaluate various MSW management alternatives and obtain the optimal combination of technologies for the handling, treatment and disposal of MSW in an economic and environmentally sustainable way. The sensitivity of various waste management policies is also addressed. Finally, the region of Northern Lebanon was considered as a case study with data collected for the year 2000, to demonstrate the applicability of the model

  1. Modeling a Mobile Health Management Business Model for Chronic Kidney Disease.

    Science.gov (United States)

    Lee, Ying-Li; Chang, Polun

    2016-01-01

    In these decades, chronic kidney disease (CKD) has become a global public health problem. Information technology (IT) tools have been used widely to empower the patients with chronic disease (e.g., diabetes and hypertension). It is also a potential application to advance the CKD care. In this project, we analyzed the requirements of a mobile health management system for healthcare workers, patients and their families to design a health management business model for CKD patients.

  2. Glance Information System for ATLAS Management

    International Nuclear Information System (INIS)

    Grael, F F; Maidantchik, C; Évora, L H R A; Karam, K; Moraes, L O F; Cirilli, M; Nessi, M; Pommès, K

    2011-01-01

    ATLAS Experiment is an international collaboration where more than 37 countries, 172 institutes and laboratories, 2900 physicists, engineers, and computer scientists plus 700 students participate. The management of this teamwork involves several aspects such as institute contribution, employment records, members' appointment, authors' list, preparation and publication of papers and speakers nomination. Previously, most of the information was accessible by a limited group and developers had to face problems such as different terminology, diverse data modeling, heterogeneous databases and unlike users needs. Moreover, the systems were not designed to handle new requirements. The maintenance has to be an easy task due to the long lifetime experiment and professionals turnover. The Glance system, a generic mechanism for accessing any database, acts as an intermediate layer isolating the user from the particularities of each database. It retrieves, inserts and updates the database independently of its technology and modeling. Relying on Glance, a group of systems were built to support the ATLAS management and operation aspects: ATLAS Membership, ATLAS Appointments, ATLAS Speakers, ATLAS Analysis Follow-Up, ATLAS Conference Notes, ATLAS Thesis, ATLAS Traceability and DSS Alarms Viewer. This paper presents the overview of the Glance information framework and describes the privilege mechanism developed to grant different level of access for each member and system.

  3. Glance Information System for ATLAS Management

    Science.gov (United States)

    Grael, F. F.; Maidantchik, C.; Évora, L. H. R. A.; Karam, K.; Moraes, L. O. F.; Cirilli, M.; Nessi, M.; Pommès, K.; ATLAS Collaboration

    2011-12-01

    ATLAS Experiment is an international collaboration where more than 37 countries, 172 institutes and laboratories, 2900 physicists, engineers, and computer scientists plus 700 students participate. The management of this teamwork involves several aspects such as institute contribution, employment records, members' appointment, authors' list, preparation and publication of papers and speakers nomination. Previously, most of the information was accessible by a limited group and developers had to face problems such as different terminology, diverse data modeling, heterogeneous databases and unlike users needs. Moreover, the systems were not designed to handle new requirements. The maintenance has to be an easy task due to the long lifetime experiment and professionals turnover. The Glance system, a generic mechanism for accessing any database, acts as an intermediate layer isolating the user from the particularities of each database. It retrieves, inserts and updates the database independently of its technology and modeling. Relying on Glance, a group of systems were built to support the ATLAS management and operation aspects: ATLAS Membership, ATLAS Appointments, ATLAS Speakers, ATLAS Analysis Follow-Up, ATLAS Conference Notes, ATLAS Thesis, ATLAS Traceability and DSS Alarms Viewer. This paper presents the overview of the Glance information framework and describes the privilege mechanism developed to grant different level of access for each member and system.

  4. Evaluation and Development of Pavement Scores, Performance Models and Needs Estimates for the TXDOT Pavement Management Information System : Final Report

    Science.gov (United States)

    2012-10-01

    This project conducted a thorough review of the existing Pavement Management Information System (PMIS) database, : performance models, needs estimates, utility curves, and scores calculations, as well as a review of District practices : concerning th...

  5. Understanding Knowledge Management System antecedents of performance impact: Extending the Task-technology Fit Model with intention to share knowledge construct

    Directory of Open Access Journals (Sweden)

    Ghada R. El Said

    2015-12-01

    The suggested integrated model helps for better understanding of KMS from the perspective of users’ motivation, system design, and tasks. This paper contributes-with academic and practical implications for KMS researchers, developers, and managers.

  6. Seaway Information System Management and Control Requirements

    Science.gov (United States)

    1973-10-01

    This report examines in detail the control and information system requirements of the St. Lawrence Seaway development program in terms of the needs of the vessel traffic controllers and the management users. Structural control models of Seaway operat...

  7. A Queuing Model-Based System for Triggering Traffic Flow Management Algorithms, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Next generation air traffic management systems are expected use multiple software tools and quantitative methods for managing traffic flow in the National Airspace....

  8. A Business Process Management System based on a General Optimium Criterion

    Directory of Open Access Journals (Sweden)

    Vasile MAZILESCU

    2009-01-01

    Full Text Available Business Process Management Systems (BPMS provide a broadrange of facilities to manage operational business processes. These systemsshould provide support for the complete Business Process Management (BPMlife-cycle [16]: (redesign, configuration, execution, control, and diagnosis ofprocesses. BPMS can be seen as successors of Workflow Management (WFMsystems. However, already in the seventies people were working on officeautomation systems which are comparable with today’s WFM systems.Recently, WFM vendors started to position their systems as BPMS. Our paper’sgoal is a proposal for a Tasks-to-Workstations Assignment Algorithm (TWAAfor assembly lines which is a special implementation of a stochastic descenttechnique, in the context of BPMS, especially at the control level. Both cases,single and mixed-model, are treated. For a family of product models having thesame generic structure, the mixed-model assignment problem can be formulatedthrough an equivalent single-model problem. A general optimum criterion isconsidered. As the assembly line balancing, this kind of optimisation problemleads to a graph partitioning problem meeting precedence and feasibilityconstraints. The proposed definition for the "neighbourhood" function involvesan efficient way for treating the partition and precedence constraints. Moreover,the Stochastic Descent Technique (SDT allows an implicit treatment of thefeasibility constraint. The proposed algorithm converges with probability 1 toan optimal solution.

  9. Technical note: River modelling to infer flood management framework

    African Journals Online (AJOL)

    River hydraulic models have successfully identified the weaknesses and areas for improvement with respect to flooding in the Sarawak River system, and can also be used to support decisions on flood management measures. Often, the big question is 'how'. This paper demonstrates a theoretical flood management ...

  10. Design and Management of Networked Information Systems

    DEFF Research Database (Denmark)

    Havn, Erling; Bansler, Jørgen P.

    1996-01-01

    In this paper, we present a newly started research project at the Center for Tele-Information at the Technical University of Denmark. The project focuses on the design and management of networked information systems, that is computer-based IS linked by a wide area network and supporting...... research questions:1. What is the essence of the new managerial theories and models and how do they define the role of telecommunications and IT in organizations?2. How are these organizational theories and models implemented in practice?3. How is the design and implementation of information systems...... and networks actually organized and carried out?4. What are the consequences for work content, skills, working conditions, etc.? The research project consists of a theoretical analysis of contemporary management theories as well as a number of in-depth case studies of firms engaged in the design...

  11. ModelMage: a tool for automatic model generation, selection and management.

    Science.gov (United States)

    Flöttmann, Max; Schaber, Jörg; Hoops, Stephan; Klipp, Edda; Mendes, Pedro

    2008-01-01

    Mathematical modeling of biological systems usually involves implementing, simulating, and discriminating several candidate models that represent alternative hypotheses. Generating and managing these candidate models is a tedious and difficult task and can easily lead to errors. ModelMage is a tool that facilitates management of candidate models. It is designed for the easy and rapid development, generation, simulation, and discrimination of candidate models. The main idea of the program is to automatically create a defined set of model alternatives from a single master model. The user provides only one SBML-model and a set of directives from which the candidate models are created by leaving out species, modifiers or reactions. After generating models the software can automatically fit all these models to the data and provides a ranking for model selection, in case data is available. In contrast to other model generation programs, ModelMage aims at generating only a limited set of models that the user can precisely define. ModelMage uses COPASI as a simulation and optimization engine. Thus, all simulation and optimization features of COPASI are readily incorporated. ModelMage can be downloaded from http://sysbio.molgen.mpg.de/modelmage and is distributed as free software.

  12. Barriers in Sustainable Knowledge Management Model in Education

    Directory of Open Access Journals (Sweden)

    Gratiela Dana BOCA

    2016-12-01

    Full Text Available The paper present a comprehensive model in education using the data base collected from 101 students from Turkey. The target group was students involved in academic life system. Results are used to design a model where education transfer of knowledge it is investigated in function of possible barriers as internal, external and knowledge management factors of influence in education selection and students vision for education development. As a conclusion, the evaluation of the barriers in sustainable knowledge management in education present a cross-educational model which seems to indicate its highly effective resource for environmental education focused on sustainability, and favours the development of knowledge, attitudes and future intentions of inspiring educational environment. The model can be useful on passing of knowledge from one generation to the next generation, managing succession and distributing the competencies and responsibilities to a repetitive change.

  13. IMPLEMENTATION OF INTEGRAL SYSTEM OF QUALITY MANAGEMENT IN TOURISM

    Directory of Open Access Journals (Sweden)

    Vidoje Vujic

    2007-12-01

    Full Text Available Theory and practice have corroborated the need and usefulness of an integral approach to quality management in tourist destinations, since the destination and its touristic offer define a number of disparate participants and interested parties. An integral system of quality management is one of the models of touristic management that with the implementation of contemporary principles strives to achieve business excellence and competitory advantage. The paper determines and projects the need and importance of implementing an integral system and accordingly seeks to form a model for its development. By studying the oneness of the whole we have established the dependence and firm connections between particular norms and elements, and by analyzing them in this paper we describe the structure and associated characteristics of the whole.

  14. Economics, modeling, planning and management of energy

    International Nuclear Information System (INIS)

    Rogner, H.H.; Khan, A.M.; Furlan, G.

    1989-01-01

    The Workshop attended by 89 participants from 40 countries aimed to provide participants with an overview of global and regional issues and to familiarize them with analytical tools and modeling techniques appropriate for the analysis and planning of national energy systems. Emphasis was placed on energy-economy-interaction, modelling for balancing energy demand and supply, technical-economic evaluation of energy supply alternatives and energy demand management. This volume presents some of the lectures delivered at the Workshop. The material has been organized in five parts under the headings General Review of Current Energy Trends, Energy and Technology Menu, Basic Analytical Approaches, Energy Modeling and Planning, and Energy Management and Policy. A separate abstract was prepared for each of the lectures presented. Refs, figs and tabs

  15. A self-cognizant dynamic system approach for prognostics and health management

    Science.gov (United States)

    Bai, Guangxing; Wang, Pingfeng; Hu, Chao

    2015-03-01

    Prognostics and health management (PHM) is an emerging engineering discipline that diagnoses and predicts how and when a system will degrade its performance and lose its partial or whole functionality. Due to the complexity and invisibility of rules and states of most dynamic systems, developing an effective approach to track evolving system states becomes a major challenge. This paper presents a new self-cognizant dynamic system (SCDS) approach that incorporates artificial intelligence into dynamic system modeling for PHM. A feed-forward neural network (FFNN) is selected to approximate a complex system response which is challenging task in general due to inaccessible system physics. The trained FFNN model is then embedded into a dual extended Kalman filter algorithm to track down system dynamics. A recursive computation technique used to update the FFNN model using online measurements is also derived. To validate the proposed SCDS approach, a battery dynamic system is considered as an experimental application. After modeling the battery system by a FFNN model and a state-space model, the state-of-charge (SoC) and state-of-health (SoH) are estimated by updating the FFNN model using the proposed approach. Experimental results suggest that the proposed approach improves the efficiency and accuracy for battery health management.

  16. Emphasis: an active management model

    International Nuclear Information System (INIS)

    Gray, L.M.

    1983-01-01

    The Institute of Nuclear Materials Management was founded and has grown on the basis of promoting professionalism in the nuclear industry. This paper is concerned with professional management of nuclear material. The paper introduces the reader to Emphasis, an active management model. The management model provides the framework to assist a manager in directing his available resources. Emphasis provides for establishing goals, identifying and selecting objectives, matching objectives to specific personnel, preparing and monitoring action plans, and evaluating results. The model stresses crisis prevention by systematically administering and controlling resources. A critical requirement for implementation of the model is the desire to manage, to be in charge of the situation. The nuclear industry does need managers - people who realize the sensitive nature of the industry, professionals who insist on improved performance

  17. Process models as tools in forestry research and management

    Science.gov (United States)

    Kurt Johnsen; Lisa Samuelson; Robert Teskey; Steve McNulty; Tom Fox

    2001-01-01

    Forest process models are mathematical representations of biological systems that incorporate our understanding of physiological and ecological mechanisms into predictive algorithms. These models were originally designed and used for research purposes, but are being developed for use in practical forest management. Process models designed for research...

  18. 网络管理中的建模技术%Modeling Technologies in Network Management

    Institute of Scientific and Technical Information of China (English)

    张鹏; 李钢; 李增智

    2000-01-01

    Modeling is an effective approach during science research or engineering development. Based on the brief introduction to basic structure of network management systems ,this paper discusses the application scope of modeling method. Subsequently, related to the development work in the project of HiTMN, a local telephone network management system, two kinds of model are built for telephone switching network. They are mathematical model and object-oriented model, built using mathematical modeling method and object modeling technology respectively. Finally ,the importance of using modeling technologies in network management is emphasized.

  19. Risk management model of winter navigation operations

    International Nuclear Information System (INIS)

    Valdez Banda, Osiris A.; Goerlandt, Floris; Kuzmin, Vladimir; Kujala, Pentti; Montewka, Jakub

    2016-01-01

    The wintertime maritime traffic operations in the Gulf of Finland are managed through the Finnish–Swedish Winter Navigation System. This establishes the requirements and limitations for the vessels navigating when ice covers this area. During winter navigation in the Gulf of Finland, the largest risk stems from accidental ship collisions which may also trigger oil spills. In this article, a model for managing the risk of winter navigation operations is presented. The model analyses the probability of oil spills derived from collisions involving oil tanker vessels and other vessel types. The model structure is based on the steps provided in the Formal Safety Assessment (FSA) by the International Maritime Organization (IMO) and adapted into a Bayesian Network model. The results indicate that ship independent navigation and convoys are the operations with higher probability of oil spills. Minor spills are most probable, while major oil spills found very unlikely but possible. - Highlights: •A model to assess and manage the risk of winter navigation operations is proposed. •The risks of oil spills in winter navigation in the Gulf of Finland are analysed. •The model assesses and prioritizes actions to control the risk of the operations. •The model suggests navigational training as the most efficient risk control option.

  20. IT Project Management from a Systems Thinking Perspective: A Position Paper

    NARCIS (Netherlands)

    van Eck, Pascal; Ponisio, Laura

    2008-01-01

    We proposes a Systems Thinking approach to the study of IT project management and show how this approach helps project managers in controlling their projects. To illustrate our proposal, we present an example model of the dynamics of IT out-sourcing projects. The example model explains these

  1. State-of-the-art radioecological models implemented in decision support systems for the management of the fresh water environment

    International Nuclear Information System (INIS)

    Monte, Luigi

    2007-01-01

    The present lecture summarises the main results of a review and assessment of state-of-the-art models implemented in computerised decision support systems aimed at assisting the management of fresh water ecosystems contaminated by radioactive substances. The approaches of the various models to simulate the complex behaviour of radionuclides in the aquatic environment were discussed. A critical analysis of the whole sector was carried out in order to frame in a comprehensive perspective several complementary issues: model uncertainty, environmental variability, information incompleteness, multi-model approach, use of models for the decision making. (author)

  2. Management information systems

    Energy Technology Data Exchange (ETDEWEB)

    Crump, K.

    1978-01-01

    An Australian university architect studying management information systems programs at academic institutions in the United States visited 26 universities and colleges and nine educational and professional associations, including extended visits at the University of Wisconsin and the National Center of Higher Education Management Systems. During these visits, he investigated university and college space utilization programs, gained operational and developmental experience at institutions with education philosophies similar to those in Australia, and examined trends in low cost student housing. This report of his observations focusses on management information systems projects throughout the academic community, resource accountability, energy conservation, facilities planning for the handicapped, student housing, and interdisciplinary approaches to education.

  3. Advantages and Limitations of Integrated Management System: the Theoretical Viewpoint

    Directory of Open Access Journals (Sweden)

    Agota Giedrė Raišienė

    2013-08-01

    Full Text Available Purpose. The goal of the paper is to discuss the potential benefits and to highlight the drawbacks of integrated management system for organizations that seek to improve management process.Methodology. Methods of the research were used: analysis of a scientific and special literature that presents the requirements, models and results of integrated management systems studies, and analysis of statistical data to assess actuality of integrated management systems for enterprises in Lithuania.Findings. Summarizing research findings, it should be stated that the implementation of management system integration should be based on provision of social responsibility and holistic approach to the organization. It requires the long-term united efforts of leaders in a strategic hierarchical level and high organizational maturity to ensure the fluency of the running stages of planning management system integration, preparing documentations, implementing and realizing integrated management system. Also it is necessary to purify the conception of integrated management system in organizational context. Theoretical analysis of integrated management systems show, that all of the management systems can not be well integrated in principle. They can only be partly integrated and coordinated. A need to question the level of integration of management systems is very important as in scientific discourse as in practice. It is important to mark, that the number of organizations, that seek to optimize management processes by implementing the integrated management systems is rapidly increasing in Lithuania, too. It shows that benefit associated with integration of management systems is apprehensible in Lithuania. Advantages of integrated management systems can certainly become even stronger if scientists and practicians join their forces in search of methods of organizational management development.Research limitations. The research limitations related to a lack of

  4. Model of knowledge management in mobile systems used for training

    Directory of Open Access Journals (Sweden)

    Chadwick CARRETO ARELLANO

    2014-11-01

    Full Text Available This work shows the development of a Knowledge Management Model (MAC applied to the training process in mobile devices for ease of use and access of different types of users to relevant information (anywhere and anytime. The MAC permit to manage knowledge, so that helps in the process of collection, classification and search of information according to a profile and academic needs as well as services related to the transformation of data and information for knowledge generation. The MAC aims to provide users, tools for skills development and allow the development of the training process with the use of limited capacity device with Internet connection.

  5. Assuring data quality for use in waste management system trade-off studies

    International Nuclear Information System (INIS)

    Shay, M.R.; Stiles, D.L.

    1990-04-01

    The US Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) has responsibility for constructing and operating facilities to accept and dispose of high-level nuclear waste generated by commercial and defense reactors. The Office of Systems Integration and Regulation within OCRWM has sponsored the development of a suite of computer models to be used in analyzing various possible alternatives for the configuration and operation of the federal high-level radioactive waste management system. This suite of models and their associated databases is referred to as the Systems Integration Modeling System (SIMS). As part of SIMS, Battelle Pacific Northwest Laboratories has developed the Systems Engineering Cost Analysis Capability (SECAC), which, working in conjunction with one or more logistics models, provides cost estimates at various levels of detail for the complete Federal Waste Management System (FWMS). The SECAC has been designed as a flexible tool for use in estimating the cost of alternative operating modes, different waste acceptance priorities and alternative designs that may be proposed for the FWMS components. A relatively large amount of data must be compiled and managed to fully represent these possible alternative FWMS configurations and operating strategies. A systems engineering approach has been implemented to ensure the integrity of this large cost data library throughout the evolution of the capability. 4 refs

  6. Review: David Lohmann (2003. Das Bielefelder Diakonie-Management-Modell [The Bielefeld Deaconry Management Model

    Directory of Open Access Journals (Sweden)

    Jürgen Rausch

    2006-01-01

    Full Text Available In six chapters, David LOHMANN makes suggestions for theological-ethical deaconry management, including a consideration of economic necessities. Through a qualitative comparison of documented sources, the author generates a theory of theological-ethical enterprise management. Following that, the author considers the theology of the deaconry in the context of TILLICH's model of believed realism and WICHERN’s theological concept of the inner mission. At the center of the examination lies a formulation of a cybernetic theory of deaconry theology. Of the available management models, the author favours the St. Galler model as the basic model of deaconry enterprise management. In doing so, the author lays out theological ground rules for the normative, strategic and operational levels of deaconry. In attempting to formulate this prospective deaconry management model through the consideration of the work of the two 20th century theologians and his own personal experience, the current needs and knowledge-base of specific deaconries are not considered. A systematic consideration of quantitative social research would have been a worthwhile supplement. In conclusion, the analysis develops a management model for deaconry enterprises that emphasizes the interdisciplinary aspects of theology and business economics. The book confirms the competitive value of a management model attuned to the theological and economic aspects of a deaconry. URN: urn:nbn:de:0114-fqs0601356

  7. Analysis and design of hospital management information system based on UML

    Science.gov (United States)

    Ma, Lin; Zhao, Huifang; You, Shi Jun; Ge, Wenyong

    2018-05-01

    With the rapid development of computer technology, computer information management system has been utilized in many industries. Hospital Information System (HIS) is in favor of providing data for directors, lightening the workload for the medical workers, and improving the workers efficiency. According to the HIS demand analysis and system design, this paper focus on utilizing unified modeling language (UML) models to establish the use case diagram, class diagram, sequence chart and collaboration diagram, and satisfying the demands of the daily patient visit, inpatient, drug management and other relevant operations. At last, the paper summarizes the problems of the system and puts forward an outlook of the HIS system.

  8. An integrated bi-level optimization model for air quality management of Beijing's energy system under uncertainty.

    Science.gov (United States)

    Jin, S W; Li, Y P; Nie, S

    2018-05-15

    In this study, an interval chance-constrained bi-level programming (ICBP) method is developed for air quality management of municipal energy system under uncertainty. ICBP can deal with uncertainties presented as interval values and probability distributions as well as examine the risk of violating constraints. Besides, a leader-follower decision strategy is incorporated into the optimization process where two decision makers with different goals and preferences are involved. To solve the proposed model, a bi-level interactive algorithm based on satisfactory degree is introduced into the decision-making processes. Then, an ICBP based energy and environmental systems (ICBP-EES) model is formulated for Beijing, in which air quality index (AQI) is used for evaluating the integrated air quality of multiple pollutants. Result analysis can help different stakeholders adjust their tolerances to achieve the overall satisfaction of EES planning for the study city. Results reveal that natural gas is the main source for electricity-generation and heating that could lead to a potentially increment of imported energy for Beijing in future. Results also disclose that PM 10 is the major contributor to AQI. These findings can help decision makers to identify desired alternatives for EES planning and provide useful information for regional air quality management under uncertainty. Copyright © 2018 Elsevier B.V. All rights reserved.

  9. The Model of Manager in the New Economy

    Directory of Open Access Journals (Sweden)

    Doronin Andrii V.

    2018-01-01

    Full Text Available The article generalizes the preconditions of building a manager model for the new economy. The necessity of filling such model with personal characteristics, allowing to combine unique qualities of the employee of management system with the creative potential of collective, is determined. The hypothesis is formulated, implying that the combined working force of the collective created on this basis is capable to effectively implement the functions provided by the job instruction, and to find solutions of the unexpected crisis problems during the work. Possibilities of materializing the ideas of development of personal potential of the manager on the interdisciplinary basis were analyzed. A list of personal factors of formation and development of professional mobility of manager has been presented. As a synthesis criterion for the implementation of the labor personal potential of manager, it has been proposed to use the assessment of quality of working life.

  10. An Intelligent Knowledge Management System from a Semantic Perspective

    Directory of Open Access Journals (Sweden)

    Vasile MAZILESCU

    2008-01-01

    Full Text Available Knowledge Management Systems (KMS are important tools by whichorganizations can better use information and, more importantly, manageknowledge. Unlike other strategies, knowledge management (KM is difficult todefine because it encompasses a range of concepts, management tasks,technologies, and organizational practices, all of which come under the umbrella ofthe information management. Semantic approaches allow easier and more efficienttraining, maintenance, and support knowledge. Current ICT markets are dominatedby relational databases and document-centric information technologies, proceduralalgorithmic programming paradigms, and stack architecture. A key driver of globaleconomic expansion in the coming decade is the build-out of broadbandtelecommunications and the deployment of intelligent services bundling. This paperintroduces the main characteristics of an Intelligent Knowledge ManagementSystem as a multiagent system used in a Learning Control Problem (IKMSLCP,from a semantic perspective. We describe an intelligent KM framework, allowingthe observer (a human agent to learn from experience. This framework makes thesystem dynamic (flexible and adaptable so it evolves, guaranteeing high levels ofstability when performing his domain problem P. To capture by the agent who learnthe control knowledge for solving a task-allocation problem, the control expertsystem uses at any time, an internal fuzzy knowledge model of the (businessprocess based on the last knowledge model.

  11. The Resource Manager the ATLAS Trigger and Data Acquisition System

    CERN Document Server

    Aleksandrov, Igor; The ATLAS collaboration; Lehmann Miotto, Giovanna; Soloviev, Igor

    2016-01-01

    The Resource Manager of the ATLAS Trigger and Data Acquisition system The Resource Manager is one of the core components of the Data Acquisition system of the ATLAS experiment at the LHC. The Resource Manager marshals the right for applications to access resources which may exist in multiple but limited copies, in order to avoid conflicts due to program faults or operator errors. The access to resources is managed in a manner similar to what a lock manager would do in other software systems. All the available resources and their association to software processes are described in the Data Acquisition configuration database. The Resource Manager is queried about the availability of resources every time an application needs to be started. The Resource Manager’s design is based on a client-server model, hence it consists of two components: the Resource Manager "server" application and the "client" shared library. The Resource Manager server implements all the needed functionalities, while the Resource Manager c...

  12. Managing Conflict in Temporary Management Systems

    Science.gov (United States)

    Wilemon, David L.

    1973-01-01

    As organizational tasks have grown more complex, several innovative temporary management systems such as matrix management have been developed. The Apollo space program has been an important contribution to the development of matrix management techniques. Discusses the role of conflict within the matrix, its determinants, and the process of…

  13. Integrated maintenance management model in the printing industry

    Directory of Open Access Journals (Sweden)

    Csaba Horváth

    2010-09-01

    Full Text Available Rapid technological and economic changes are setting radically new task for maintenance divisions of printingworks. In this dissertation the author provides a summary on the possible approaches for the adoption to the newrequirements. He formulates his situation analysis based on an exhaustive questionnaire survey, and points out thecurrents of changes and challenges caused by the expected developments in the maintenance field of the printingindustry.Based on the possible answers on these challenges, the Author has compiled a - yet missing - maintenance managementmodel that encompasses the maintenance specialties of the industry, as well as the professional heritage andthe latest scientific accomplishments in the discipline of maintenance.The model is based on the widely accepted quality focused maintenance approach, that is supplemented by theAuthor with four new aspects - 1 reliability-focused culture, 2 quality management system, 3 employment ofexternal service provides, 4 maintenance characteristics specific to printing machinery - determining their effectsand integrating them into one single system.In order to construct the model, the Author develops specific solutions that can be seen as own scientific achievementson the specification of maintenance characteristics of printing machinery; on the efficiency improving applicationsof quality management systems, modern knowledge management and reliability focused corporate culture;and on the implementation of a maintenance information system.

  14. Advantages and Limitations of Integrated Management System: the Theoretical Viewpoint

    Directory of Open Access Journals (Sweden)

    Agota Giedrė Raišienė

    2011-08-01

    Full Text Available Purpose. The goal of the paper is to discuss the potential benefits and to highlight the drawbacks of integrated management system for organizations that seek to improve management process.Methodology. Methods of the research were used: analysis of a scientific and special literature that presents the requirements, models and results of integrated management systems studies, and analysis of statistical data to assess actuality of integrated management systems for enterprises in Lithuania.Findings. Summarizing research findings, it should be stated that the implementation of management system integration should be based on provision of social responsibility and holistic approach to the organization. It requires the long-term united efforts of leaders in a strategic hierarchical level and high organizational maturity to ensure the fluency of the running stages of planning management system integration, preparing documentations, implementing and realizing integrated management system. Also it is necessary to purify the conception of integrated management system in organizational context. Theoretical analysis of integrated management systems show, that all of the management systems can not be well integrated in principle. They can only be partly integrated and coordinated. A need to question the level of integration of managementsystems is very important as in scientific discourse as in practice. It is important to mark, that the number of organizations, that seek to optimize management processes by implementing the integrated management systems is rapidly increasing in Lithuania, too. It shows that benefit associated with integration of management systems is apprehensible in Lithuania. Advantages of integrated management systems can certainly become even stronger if scientists and practicians join their forces in search of methods of organizational management development.Research limitations. The research limitations related to a lack of integrated

  15. System Dynamics Model to develop resilience management strategies for lifelines exposed to natural hazards

    Science.gov (United States)

    Pagano, Alessandro; Pluchinotta, Irene; Giordano, Raffaele; Vurro, Michele

    2016-04-01

    Resilience has recently become a key concept, and a crucial paradigm in the analysis of the impacts of natural disasters, mainly concerning Lifeline Systems (LS). Indeed, the traditional risk management approaches require a precise knowledge of all potential hazards and a full understanding of the interconnections among different infrastructures, based on past events and trends analysis. Nevertheless, due to the inner complexity of LS, their interconnectedness and the dynamic context in which they operate (i.e. technology, economy and society), it is difficult to gain a complete comprehension of the processes influencing vulnerabilities and threats. Therefore, resilience thinking addresses the complexities of large integrated systems and the uncertainty of future threats, emphasizing the absorbing, adapting and responsive behavior of the system. Resilience thinking approaches are focused on the capability of the system to deal with the unforeseeable. The increasing awareness of the role played by LS, has led governmental agencies and institutions to develop resilience management strategies. Risk prone areas, such as cities, are highly dependent on infrastructures providing essential services that support societal functions, safety, economic prosperity and quality of life. Among the LS, drinking water supply is critical for supporting citizens during emergency and recovery, since a disruption could have a range of serious societal impacts. A very well-known method to assess LS resilience is the TOSE approach. The most interesting feature of this approach is the integration of four dimensions: Technical, Organizational, Social and Economic. Such issues are all concurrent to the resilience level of an infrastructural system, and should be therefore quantitatively assessed. Several researches underlined that the lack of integration among the different dimensions, composing the resilience concept, may contribute to a mismanagement of LS in case of natural disasters

  16. Management systems in production operations

    International Nuclear Information System (INIS)

    Walters, K.B.; Henderson, G.

    1993-01-01

    The Cullen Enquiry into the Piper Alpha disaster in the U.K. North Sea recommended that an operator should formally present it's company Management System and demonstrate how safety is achieved throughout the life cycle of a platform, from design through operation to abandonment. Brunei Shell Petroleum has prepared a corporate level Safety Management System. As part of Safety Case work, the corporate system is being extended to include the development of specific Management Systems with particular emphasis on offshore production operations involving integrated oil and gas facilities. This paper will describe the development of Management Systems, which includes an intensive Business Process Analysis and will comment upon it's applicability and relationship to ISO 9000. The paper will further describe the applicability and benefits of Management Systems and offer guidance on required effort. The paper will conclude that development of structured Management Systems for safety critical business processes is worthwhile but prioritization of effort will be necessary. As such the full adoption of Management Systems will be directional in nature

  17. Identification of optimal strategies for energy management systems planning under multiple uncertainties

    International Nuclear Information System (INIS)

    Cai, Y.P.; Huang, G.H.; Yang, Z.F.; Tan, Q.

    2009-01-01

    Management of energy resources is crucial for many regions throughout the world. Many economic, environmental and political factors are having significant effects on energy management practices, leading to a variety of uncertainties in relevant decision making. The objective of this research is to identify optimal strategies in the planning of energy management systems under multiple uncertainties through the development of a fuzzy-random interval programming (FRIP) model. The method is based on an integration of the existing interval linear programming (ILP), superiority-inferiority-based fuzzy-stochastic programming (SI-FSP) and mixed integer linear programming (MILP). Such a FRIP model allows multiple uncertainties presented as interval values, possibilistic and probabilistic distributions, as well as their combinations within a general optimization framework. It can also be used for facilitating capacity-expansion planning of energy-production facilities within a multi-period and multi-option context. Complexities in energy management systems can be systematically reflected, thus applicability of the modeling process can be highly enhanced. The developed method has then been applied to a case of long-term energy management planning for a region with three cities. Useful solutions for the planning of energy management systems were generated. Interval solutions associated with different risk levels of constraint violation were obtained. They could be used for generating decision alternatives and thus help decision makers identify desired policies under various economic and system-reliability constraints. The solutions can also provide desired energy resource/service allocation and capacity-expansion plans with a minimized system cost, a maximized system reliability and a maximized energy security. Tradeoffs between system costs and constraint-violation risks could be successfully tackled, i.e., higher costs will increase system stability, while a desire for lower

  18. Optimizing Use of Water Management Systems during Changes of Hydrological Conditions

    Science.gov (United States)

    Výleta, Roman; Škrinár, Andrej; Danáčová, Michaela; Valent, Peter

    2017-10-01

    When designing the water management systems and their components, there is a need of more detail research on hydrological conditions of the river basin, runoff of which creates the main source of water in the reservoir. Over the lifetime of the water management systems the hydrological time series are never repeated in the same form which served as the input for the design of the system components. The design assumes the observed time series to be representative at the time of the system use. However, it is rather unrealistic assumption, because the hydrological past will not be exactly repeated over the design lifetime. When designing the water management systems, the specialists may occasionally face the insufficient or oversized capacity design, possibly wrong specification of the management rules which may lead to their non-optimal use. It is therefore necessary to establish a comprehensive approach to simulate the fluctuations in the interannual runoff (taking into account the current dry and wet periods) in the form of stochastic modelling techniques in water management practice. The paper deals with the methodological procedure of modelling the mean monthly flows using the stochastic Thomas-Fiering model, while modification of this model by Wilson-Hilferty transformation of independent random number has been applied. This transformation usually applies in the event of significant asymmetry in the observed time series. The methodological procedure was applied on the data acquired at the gauging station of Horné Orešany in the Parná Stream. Observed mean monthly flows for the period of 1.11.1980 - 31.10.2012 served as the model input information. After extrapolation the model parameters and Wilson-Hilferty transformation parameters the synthetic time series of mean monthly flows were simulated. Those have been compared with the observed hydrological time series using basic statistical characteristics (e. g. mean, standard deviation and skewness) for testing

  19. Model reliability and software quality assurance in simulation of nuclear fuel waste management systems

    International Nuclear Information System (INIS)

    Oeren, T.I.; Elzas, M.S.; Sheng, G.; Wageningen Agricultural Univ., Netherlands; McMaster Univ., Hamilton, Ontario)

    1985-01-01

    As is the case with all scientific simulation studies, computerized simulation of nuclear fuel waste management systems can introduce and hide various types of errors. Frameworks to clarify issues of model reliability and software quality assurance are offered. Potential problems with reference to the main areas of concern for reliability and quality are discussed; e.g., experimental issues, decomposition, scope, fidelity, verification, requirements, testing, correctness, robustness are treated with reference to the experience gained in the past. A list comprising over 80 most common computerization errors is provided. Software tools and techniques used to detect and to correct computerization errors are discussed

  20. A system dynamic modeling approach for evaluating municipal solid waste generation, landfill capacity and related cost management issues

    International Nuclear Information System (INIS)

    Kollikkathara, Naushad; Feng Huan; Yu Danlin

    2010-01-01

    As planning for sustainable municipal solid waste management has to address several inter-connected issues such as landfill capacity, environmental impacts and financial expenditure, it becomes increasingly necessary to understand the dynamic nature of their interactions. A system dynamics approach designed here attempts to address some of these issues by fitting a model framework for Newark urban region in the US, and running a forecast simulation. The dynamic system developed in this study incorporates the complexity of the waste generation and management process to some extent which is achieved through a combination of simpler sub-processes that are linked together to form a whole. The impact of decision options on the generation of waste in the city, on the remaining landfill capacity of the state, and on the economic cost or benefit actualized by different waste processing options are explored through this approach, providing valuable insights into the urban waste-management process.

  1. Demand Management Based on Model Predictive Control Techniques

    Directory of Open Access Journals (Sweden)

    Yasser A. Davizón

    2014-01-01

    Full Text Available Demand management (DM is the process that helps companies to sell the right product to the right customer, at the right time, and for the right price. Therefore the challenge for any company is to determine how much to sell, at what price, and to which market segment while maximizing its profits. DM also helps managers efficiently allocate undifferentiated units of capacity to the available demand with the goal of maximizing revenue. This paper introduces control system approach to demand management with dynamic pricing (DP using the model predictive control (MPC technique. In addition, we present a proper dynamical system analogy based on active suspension and a stability analysis is provided via the Lyapunov direct method.

  2. Management Information Systems Research.

    Science.gov (United States)

    Research on management information systems is illusive in many respects. Part of the basic research problem in MIS stems from the absence of standard...decision making. But the transition from these results to the realization of ’satisfactory’ management information systems remains difficult indeed. The...paper discusses several aspects of research on management information systems and reviews a selection of efforts that appear significant for future progress. (Author)

  3. Anatomy of an anesthesia information management system.

    Science.gov (United States)

    Shah, Nirav J; Tremper, Kevin K; Kheterpal, Sachin

    2011-09-01

    Anesthesia information management systems (AIMS) have become more prevalent as more sophisticated hardware and software have increased usability and reliability. National mandates and incentives have driven adoption as well. AIMS can be developed in one of several software models (Web based, client/server, or incorporated into a medical device). Irrespective of the development model, the best AIMS have a feature set that allows for comprehensive management of workflow for an anesthesiologist. Key features include preoperative, intraoperative, and postoperative documentation; quality assurance; billing; compliance and operational reporting; patient and operating room tracking; and integration with hospital electronic medical records. Copyright © 2011 Elsevier Inc. All rights reserved.

  4. Organizational and methodological aspects for contemporary health and safety management system

    Directory of Open Access Journals (Sweden)

    Sugak Evgeny

    2017-01-01

    Full Text Available Industrial injuries and work-related disorders considerable lowering we are facing in developed countries may be due to switching to a new health and safety management system entitled “Occupational Safety and Health Management System”. The Russian Federation has prepared certain regulatory documents prescribing some suggestions regarding implementing the contemporary system for industrial injuries prevention based upon the methods for professional risks management. However, despite the efforts made by the Russian Government, reformation of the health and safety management system at various companies is being performed rather slowly that may be as well owing to poor competence of managers and specialists regarding contemporary labor safety model content, methodical and organizational novations in the sphere of occupational safety and health management.. The article refers to a number of principal issues distinguishing the new health and safety management system from conventional approach.

  5. Quality of experience management in mobile content delivery systems

    NARCIS (Netherlands)

    Agboma, F.; Liotta, A.

    2012-01-01

    This study contributes towards the relatively new but growing discipline of QoE management in content delivery systems. The study focuses on the development of a QoE-based management framework for the construction of QoE models for different types of multimedia contents delivered onto three typical

  6. Construction Management Risk System (CMRS for Construction Management (CM Firms

    Directory of Open Access Journals (Sweden)

    Kyungmo Park

    2017-02-01

    Full Text Available After the global financial crisis of 2008, the need for risk management arose because it was necessary to minimize the losses in construction management (CM firms. This was caused by a decreased amount of orders in the Korean CM market, which intensified order competition between companies. However, research results revealed that risks were not being systematically managed owing to the absence of risk management systems. Thus, it was concluded that it was necessary to develop standard operating systems and implement risk management systems in order to manage risks effectively. Therefore, the purpose of this study was to develop a construction risk management system (CRMS for systematically managing risks. For this purpose, the field operation managers of CM firms were interviewed and surveyed in order to define risk factors. Upon this, a risk assessment priority analysis was performed. Finally, a risk management system that comprised seven modules and 20 sub-modules and was capable of responding systematically to risks was proposed. Furthermore, the effectiveness of this system was verified through on-site inspection. This system allows early response to risks, accountability verification and immediate response to legal disputes with clients by managing risk records.

  7. Development of Information Management System for Plant Life Cycle Management

    International Nuclear Information System (INIS)

    Byon, SuJin; Lee, SangHyun; Kim, WooJoong

    2015-01-01

    The study subjects are S. Korean NPP(Nuclear Power Plant) construction projects. Design, construction, operations companies have different nuclear power plant construction project structures, and each company has its own Information Management System. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each lifecycle phase. The main perspective of Information Management is moving from the existent document-centric management to the data-centric management. To do so, we intend to integrate information with interfaces among systems. Integrated information management structure and management system are essential for an effective management of the lifecycle information of nuclear power plants that have a lifespan over as much as 80 years. The concept of integration management adopted by the defence, ocean industries or various PLM solution providers is important. Although the NPP project has application systems in each key lifecycle phase, it is more effective to develop and use PLIMS in consideration of the interface and compatibility of information among systems. As an initial study for development of that integrated information management structure, this study is building the system and has interfaced it with a design-stage system

  8. Development of Information Management System for Plant Life Cycle Management

    Energy Technology Data Exchange (ETDEWEB)

    Byon, SuJin; Lee, SangHyun; Kim, WooJoong [KOREA HYDRO and NUCLEAR POWER CO. LTD, Daejeon (Korea, Republic of)

    2015-10-15

    The study subjects are S. Korean NPP(Nuclear Power Plant) construction projects. Design, construction, operations companies have different nuclear power plant construction project structures, and each company has its own Information Management System. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each lifecycle phase. The main perspective of Information Management is moving from the existent document-centric management to the data-centric management. To do so, we intend to integrate information with interfaces among systems. Integrated information management structure and management system are essential for an effective management of the lifecycle information of nuclear power plants that have a lifespan over as much as 80 years. The concept of integration management adopted by the defence, ocean industries or various PLM solution providers is important. Although the NPP project has application systems in each key lifecycle phase, it is more effective to develop and use PLIMS in consideration of the interface and compatibility of information among systems. As an initial study for development of that integrated information management structure, this study is building the system and has interfaced it with a design-stage system.

  9. Visualizing project management: models and frameworks for mastering complex systems

    National Research Council Canada - National Science Library

    Forsberg, Kevin; Mooz, Hal; Cotterman, Howard

    2005-01-01

    ...- and beyond that on parameters such as return on investment, market acceptance, or sustainability. Anyone who has lived with the space program, or any other hightech industrial product development, can immediately appreciate this acclaimed book. It addresses and "visualizes" the multidimensional interactions of project management and systems engineering i...

  10. Smart Shipboard Power System Operation and Management

    Directory of Open Access Journals (Sweden)

    Fotis D. Kanellos

    2016-11-01

    Full Text Available During recent years, optimal electrification of isolated offshore systems has become increasingly important and received extensive attention from the maritime industry. Especially with the introduction of electric propulsion, which has led to a total electrification of shipboard power systems known as all-electric ships (AESs, the need for more cost-effective and emission-aware solutions is augmented. Such onboard systems are prone to sudden load variations due to the changing weather conditions as well as mission profile, thus they require effective power management systems (PMSs to operate optimally under different working conditions. In this paper, coordinated optimal power management at the supply/demand side of a given AES is studied with regard to different objectives and related technical/environmental constraints. The optimal power management problem is formulated as a mixed-integer nonlinear programming (MINLP model and is solved using a metaheuristic algorithm. To show the effectiveness and applicability of the proposed PMS, several test scenarios are implemented and related simulation results are analyzed and compared to those from conventional methods.

  11. Integrated management system - ground for the global performance

    International Nuclear Information System (INIS)

    Pereira Filho, Jorge Amorim

    2000-01-01

    Organizations working in the pursuit of a sustainable development must create and continuously update their management systems, in order to achieve harmonic and lasting global results, capable of satisfying partners and clients in short and long terms. Such an improvement can be obtained by integrating preexisting classic management models, applicable to organizations of all types and scales. The implementation of this unique resulting system obeys systematic steps of planning, development, checking and correction, aiming to continuously improve the management. It is in fact a very challenging process because it demands changing people minds, increasing the amount of work and learning of new skills. Though hard-working, such implementation is encouraged both by perceiving the necessity to attain the strategic objectives and by seeing that there are some requisites not yet fully covered by the present system. Finally, this improved management system results in a better global performance, recorded under four angles: financial, increased client satisfaction, better internal processes and continuous learning, driving the organization to be more competitive and successful in the future. (author)

  12. Scientific-technical level of developments of technological process control and management systems. Modeling of processes of defective fuel pellets formation

    International Nuclear Information System (INIS)

    Troshchenko, V.G.

    2005-01-01

    Automation section of the Institute SverdNIIkhimmash is founded for development of management systems for equipment being created in the Institute and for providing of the systems by optional facilities for control and automation. To solve these problems the section takes part in investigations of technological units as objects of automation with mathematical models working out [ru

  13. 3D Viewer Platform of Cloud Clustering Management System: Google Map 3D

    Science.gov (United States)

    Choi, Sung-Ja; Lee, Gang-Soo

    The new management system of framework for cloud envrionemnt is needed by the platfrom of convergence according to computing environments of changes. A ISV and small business model is hard to adapt management system of platform which is offered from super business. This article suggest the clustering management system of cloud computing envirionments for ISV and a man of enterprise in small business model. It applies the 3D viewer adapt from map3D & earth of google. It is called 3DV_CCMS as expand the CCMS[1].

  14. Prototype of Knowledge Management System for the Higher Education Institution in Indonesia

    OpenAIRE

    Nuryasin, Ilyas; Prayudi, Yudi; Dirgahayu, Teduh

    2013-01-01

    In this paper, we propose a model of knowledge management for higher education institution in Indonesia. The model consists of five processes (i.e. capturing, structuring, storing, disseminating and implemetation) and six critical success factors (i.e. vision, culture, management support, technology, education and motivation, and maintenance). Based on the model, we develop a prototype of knowledge management system that accomodates activities and processes in higher education institutions. T...

  15. Domain management OSSs: bridging the gap between legacy and standards-based network management systems

    Science.gov (United States)

    Lemley, Todd A.

    1996-11-01

    The rapid change in the telecommunications environment is forcing carriers to re-assess not only their service offering, but also their network management philosophy. The competitive carrier environment has taken away the luxury of throwing technology at a problem by using legacy and proprietary systems and architectures. A more flexible management environment is necessary to effectively gain, and maintain operating margins in the new market era. Competitive forces are driving change which gives carriers more choices than those that are available in legacy and standards-based solutions alone. However, creating an operational support system (OSS) with this gap between legacy and standards has become as dynamic as the services which it supports. A philosophy which helps to integrate the legacy and standards systems is domain management. Domain management relates to a specific service or market 'domain,'and its associated operational support requirements. It supports a companies definition of its business model, which drives the definition of each domain. It also attempts to maximize current investment while injecting new technology available in a practical approach. The following paragraphs offer an overview of legacy systems, standards-based philosophy, and the potential of domain management to help bridge the gap between the two types of systems.

  16. Schedule-Aware Workflow Management Systems

    Science.gov (United States)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  17. Sustainable Capture: Concepts for Managing Stream-Aquifer Systems.

    Science.gov (United States)

    Davids, Jeffrey C; Mehl, Steffen W

    2015-01-01

    Most surface water bodies (i.e., streams, lakes, etc.) are connected to the groundwater system to some degree so that changes to surface water bodies (either diversions or importations) can change flows in aquifer systems, and pumping from an aquifer can reduce discharge to, or induce additional recharge from streams, springs, and lakes. The timescales of these interactions are often very long (decades), making sustainable management of these systems difficult if relying only on observations of system responses. Instead, management scenarios are often analyzed based on numerical modeling. In this paper we propose a framework and metrics that can be used to relate the Theis concepts of capture to sustainable measures of stream-aquifer systems. We introduce four concepts: Sustainable Capture Fractions, Sustainable Capture Thresholds, Capture Efficiency, and Sustainable Groundwater Storage that can be used as the basis for developing metrics for sustainable management of stream-aquifer systems. We demonstrate their utility on a hypothetical stream-aquifer system where pumping captures both streamflow and discharge to phreatophytes at different amounts based on pumping location. In particular, Capture Efficiency (CE) can be easily understood by both scientists and non-scientist alike, and readily identifies vulnerabilities to sustainable stream-aquifer management when its value exceeds 100%. © 2014, National Ground Water Association.

  18. Advanced modeling of management processes in information technology

    CERN Document Server

    Kowalczuk, Zdzislaw

    2014-01-01

    This book deals with the issues of modelling management processes of information technology and IT projects while its core is the model of information technology management and its component models (contextual, local) describing initial processing and the maturity capsule as well as a decision-making system represented by a multi-level sequential model of IT technology selection, which acquires a fuzzy rule-based implementation in this work. In terms of applicability, this work may also be useful for diagnosing applicability of IT standards in evaluation of IT organizations. The results of this diagnosis might prove valid for those preparing new standards so that – apart from their own visions – they could, to an even greater extent, take into account the capabilities and needs of the leaders of project and manufacturing teams. The book is intended for IT professionals using the ITIL, COBIT and TOGAF standards in their work. Students of computer science and management who are interested in the issue of IT...

  19. Design an optimum safety policy for personnel safety management - A system dynamic approach

    International Nuclear Information System (INIS)

    Balaji, P.

    2014-01-01

    Personnel safety management (PSM) ensures that employee's work conditions are healthy and safe by various proactive and reactive approaches. Nowadays it is a complex phenomenon because of increasing dynamic nature of organisations which results in an increase of accidents. An important part of accident prevention is to understand the existing system properly and make safety strategies for that system. System dynamics modelling appears to be an appropriate methodology to explore and make strategy for PSM. Many system dynamics models of industrial systems have been built entirely for specific host firms. This thesis illustrates an alternative approach. The generic system dynamics model of Personnel safety management was developed and tested in a host firm. The model was undergone various structural, behavioural and policy tests. The utility and effectiveness of model was further explored through modelling a safety scenario. In order to create effective safety policy under resource constraint, DOE (Design of experiment) was used. DOE uses classic designs, namely, fractional factorials and central composite designs. It used to make second order regression equation which serve as an objective function. That function was optimized under budget constraint and optimum value used for safety policy which shown greatest improvement in overall PSM. The outcome of this research indicates that personnel safety management model has the capability for acting as instruction tool to improve understanding of safety management and also as an aid to policy making

  20. Design an optimum safety policy for personnel safety management - A system dynamic approach

    Energy Technology Data Exchange (ETDEWEB)

    Balaji, P. [The Glocal University, Mirzapur Pole, Delhi- Yamuntori Highway, Saharanpur 2470001 (India)

    2014-10-06

    Personnel safety management (PSM) ensures that employee's work conditions are healthy and safe by various proactive and reactive approaches. Nowadays it is a complex phenomenon because of increasing dynamic nature of organisations which results in an increase of accidents. An important part of accident prevention is to understand the existing system properly and make safety strategies for that system. System dynamics modelling appears to be an appropriate methodology to explore and make strategy for PSM. Many system dynamics models of industrial systems have been built entirely for specific host firms. This thesis illustrates an alternative approach. The generic system dynamics model of Personnel safety management was developed and tested in a host firm. The model was undergone various structural, behavioural and policy tests. The utility and effectiveness of model was further explored through modelling a safety scenario. In order to create effective safety policy under resource constraint, DOE (Design of experiment) was used. DOE uses classic designs, namely, fractional factorials and central composite designs. It used to make second order regression equation which serve as an objective function. That function was optimized under budget constraint and optimum value used for safety policy which shown greatest improvement in overall PSM. The outcome of this research indicates that personnel safety management model has the capability for acting as instruction tool to improve understanding of safety management and also as an aid to policy making.