WorldWideScience

Sample records for metal interim monthly

  1. FedEx Gasoline Hybrid Electric Delivery Truck Evaluation: 6-Month Interim Report

    Barnitt, R.

    2010-05-01

    This interim report presents partial (six months) results for a technology evaluation of gasoline hybrid electric parcel delivery trucks operated by FedEx in and around Los Angeles, CA. A 12 month in-use technology evaluation comparing in-use fuel economy and maintenance costs of GHEVs and comparative diesel parcel delivery trucks was started in April 2009. Comparison data was collected and analyzed for in-use fuel economy and fuel costs, maintenance costs, total operating costs, and vehicle uptime. In addition, this interim report presents results of parcel delivery drive cycle collection and analysis activities as well as emissions and fuel economy results of chassis dynamometer testing of a gHEV and a comparative diesel truck at the National Renewable Energy Laboratory's (NREL) ReFUEL laboratory. A final report will be issued when 12 months of in-use data have been collected and analyzed.

  2. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit; FINAL

    Bradley, J.

    2002-01-01

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process

  3. Corrosion behaviour of metallic containers during long term interim storages

    Desgranges, C.; Feron, D.; Mazaudier, F.; Terlain, A.

    2001-01-01

    Two main corrosion phenomena are encountered in long term interim storage conditions: dry oxidation by the air when the temperature of high level nuclear wastes containers is high enough (roughly higher than 100 C) and corrosion phenomena as those encountered in outdoor atmospheric corrosion when the temperature of the container wall is low enough and so condensation is possible on the container walls. Results obtained with dry oxidation in air lead to predict small damages (less than 1μm on steels over 100 years at 100 C) and no drastic changes with pollutants. For atmospheric corrosion, first developments deal with a pragmatic method that gives assessments of the indoor atmospheric corrosivities. (author)

  4. Development of dual-purpose metal cask for interim storage of spent nuclear fuel (1). Outline of cask structure

    Shimizu, Masashi; Hayashi, Makoto; Kashiwakura, Jun

    2003-01-01

    Spent fuels discharged from nuclear power plants in Japan are planed to be reprocessed at the nuclear fuel recycle plant under construction at Rokkasho-mura. Since the amount of the spent fuels exceeds that of recycled fuel, the spent fuels have to be properly stored and maintained as recycle fuel resource until the beginning of the reprocessing. For that sake, interim storage installations are being constructed outside the nuclear power plants by 2010. The storage dry casks have been practically used as the interim storage in the nuclear power plants. From this reason, the storage system using the storage dry casks is promising as the interim storage installations away form the reactors, which are under discussion. In the interim storage facilities, the storage using the dry cask of the storage metal cask with business showings, having the function of transportation is now under discussion. By employing transportation and storage dual-purpose cask, the repack equipments can be exhausted, and the reliability of the interim storage installations can be increased. Hitachi, Ltd. has been developing the high reliable and economical transportation and storage dry metal cask. In this report, the outline of our developing transportation and storage dry cask is described. (author)

  5. Dry oxidation behaviour of metallic containers during long term interim storages

    Desgranges, C.; Terlain, A.; Bertrand, N.; Gauvain, D.

    2004-01-01

    Low-alloyed steels or carbon steels are considered candidate materials for the fabrication of some nuclear waste package containers for long term interim storage. The containers are required to remain retrievable for centuries. One factor limiting their performance on this time scale is corrosion. The estimation of the metal thickness lost by dry oxidation over such long periods requires the construction of reliable models from short-time experimental data. Two complementary approaches for modelling dry oxidation have been considered. First, basic models following simple analytical laws from classical oxidation theories have been adjusted on the apparent activation energy of oxidation deduced from experimental data. Their extrapolation to long oxidation periods confirms that the expected damage due to dry oxidation could be small. Second, a numerical model able to take in consideration several mechanisms controlling the oxide scale growth is under development. Several preliminary results are presented. (authors)

  6. Measurement station for interim inspections of Lightbridge metallic fuel rods at the Halden Boiling Water Reactor

    Hartmann, C.; Totemeier, A.; Holcombe, S.; Liverud, J.; Limi, M.; Hansen, J. E.; Navestad, E. AB(; )

    2018-01-01

    Lightbridge Corporation has developed a new Uranium-Zirconium based metallic fuel. The fuel rods aremanufactured via a co-extrusion process, and are characterized by their multi-lobed (cruciform-shaped) cross section. The fuel rods are also helically-twisted in the axial direction. Two experimental fuel assemblies, each containing four Lightbridge fuel rods, are scheduled to be irradiated in the Halden Boiling Water Reactor (HBWR) starting in 2018. In addition to on-line monitoring of fuel rod elongation and critical assembly conditions (e.g. power, flow rates, coolant temperatures, etc.) during the irradiation, several key parameters of the fuel will be measured out-of-core during interim inspections. An inspection measurement station for use in the irradiated fuel handling compartment at the HBWR has therefore been developed for this purpose. The multi-lobed cladding cross section combined with the spiral shape of the Lightbridge metallic fuel rods requires a high-precision guiding system to ensure good position repeatability combined with low-friction guiding. The measurement station is equipped with a combination of instruments and equipment supplied from third-party vendors and instruments and equipment developed at Institute for Energy Technology (IFE). Two sets of floating linear voltage differential transformer (LVDT) pairs are used to measure swelling and diameter changes between the lobes and the valleys over the length of the fuel rods. Eddy current probes are used to measure the thickness of oxide layers in the valleys and on the lobe tips and also to detect possible surface cracks/pores. The measurement station also accommodates gamma scans. Additionally, an eddy-current probe has been developed at IFE specifically to detect potential gaps or discontinuities in the bonding layer between the metallic fuel and the Zirconium alloy cladding. Potential gaps in the bonding layer will be hidden behind a 0.5-1.0 mm thick cladding wall. It has therefore been

  7. A long-term randomised trial on tenoxicam and piroxicam in osteoarthritis of the hip or knee: a 24-month interim report focusing on the 12-24 month interval

    Lund, B; Andersen, R B; Fossgreen, J

    1987-01-01

    The long-acting antiphlogistics tenoxicam (Ro 12-0068, Tilcotil) and piroxicam in single daily oral doses of 20 mg are compared in a double-blind, group-comparative, randomised trial planned to last for five years. Results of 12 months' treatment of 108 patients with osteoarthritis of the hip...... or knee have been reported. This interim analysis focuses mainly on the 12 to 24 month interval. The clinical improvements obtained within the first 12 months persisted during the second year in the 55 patients remaining on treatment. After 24 months, 53 patients had been withdrawn prematurely, three......-quarters because of inefficacy or intolerance. Only six patients were withdrawn between 12 and 24 months, three for lack of efficacy, two for side-effects and one for reasons unrelated to therapy. There was no difference between the treatment groups with regard to incidence, time or reason for withdrawal, and only...

  8. 24 CFR 35.1330 - Interim controls.

    2010-04-01

    ... Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim..., cleanable covering or coating, such as metal coil stock, plastic, polyurethane, or linoleum. (3) Surfaces...

  9. Seal performance of thermal aged metal gasket of dual purpose metal cask for interim spent fuel storage after external impact load

    Takeshi Yokoyama; Masami Kato; Satoshi Itooka

    2005-01-01

    As for interim storage for spent nuclear fuels using dual purpose dry metal cask in Japan, we recognize one of the important technical issues that there is a possibility for the cask with degraded metal gasket during storage to apply to transportation. In our study until 2003 focused on degradation of important components for the cask safety performance during storage and application to transportation, for metal gasket, we conducted property tests for degradation and influence of lid movement on seal performance, and furthermore verification tests. From the results, we developed the method to evaluate leak rate from lid with degraded metal gasket at accidents during transportation and in addition, we found as follows: Lid would hardly move and leak rate would not increase seriously during fire event. Leak rate from lid with degraded metal gasket could be evaluated by using results of leak rate trend depending on horizontal displacement of lid by external impact load. So, with regard to influence of lid movement on seal performance, we conducted additional test for extending horizontal displacement in lid moving in 2004. In addition, seal performance was discussed from the results, both previous and latest test. (authors)

  10. Interim restorations.

    Gratton, David G; Aquilino, Steven A

    2004-04-01

    Interim restorations are a critical component of fixed prosthodontic treatment, biologically and biomechanically. Interim restoration serves an important diagnostic role as a functional and esthetic try-in and as a blueprint for the design of the definitive prosthesis. When selecting materials for any interim restoration, clinicians must consider physical properties, handling properties, patient acceptance, and material cost. Although no single material meets all the requirements and material classification alone of a given product is not a predictor of clinical performance, bis-acryl materials are typically best suited to single-unit restorations, and poly(methylmethacrylate) interim materials are generally ideal for multi-unit, complex, long-term, interim fixed prostheses. As with most dental procedures, the technique used for fabrication has a greater effect on the final result than the specific material chosen.

  11. Non steady-state model for dry oxidation of nuclear wastes metallic containers in long term interim storage conditions

    Bertrand, Nathalie; Desgranges, Clara; Poquillon, Dominique; Monceau, Daniel

    2006-01-01

    For high-level nuclear waste containers in long-term interim storage, dry oxidation will be the first and the main degradation mode. The reason is that, for this kind of waste, the temperature on the surface of the containers will be high enough to avoid any condensation phenomena for several years. Even if the scale growth kinetics is expected to be very slow since the temperature will be moderate at the beginning of the storage (around 300 deg. C) and will keep on decreasing, the metal thickness lost by dry oxidation over such a long period must be evaluated with a good reliability. To achieve this goal, modelling of the oxide scale growth is necessary and this is the aim of the dry oxidation studies, performed in the frame of the COCON programme. All existing oxidation models are based on the two main oxidation theories developed by Wagner between the 1930's and 1970's on the one hand, and by Cabrera and Mott in the 1960 and next by Fromhold on the other hand. These used to be associated with high temperature behaviour for Wagner's theory and with low temperature for the second one. Indeed it is certainly more relevant to consider their range of application in terms of the oxide scale thickness rather than in terms of temperature. The question is posed about which theory should an appropriate model rely on. It can be expected that the oxide scale could have a thickness ranging from a few tens of nanometers up to several tens of micrometers depending on temperature and class of alloys chosen. At the present time, low-alloyed steels or carbon steels are considered candidate materials for high-level nuclear waste containers in long term interim storage. For this type of alloys, the scale formed during the dry oxidation stage will be 'rapidly' thick enough to neglect the Mott field. Hence, in a first step, some basic models based on a parabolic rate assumption, that is to say Wagner's model, have been derived from experimental data on iron and on low-alloy steel

  12. Interim overdentures.

    Fenton, A H

    1976-07-01

    The construction of an interim overdenture using existing removable partial dentures with natural tooth crowns and artificial teeth can be a simple and economical method of providing patients with dentures while tissues heal and teeth are prepared and restored. A more definite prognosis for both the patient and his remaining dentition can be established before the final overdenture is completed. The procedures necessary to provide three types of interim overdentures have been outlined. Patients tolerate this method of changing their dentitions extremely well.

  13. A trabecular metal implant 4 months after placement: clinical-histologic case report.

    Spinato, Sergio; Zaffe, Davide; Felice, Pietro; Checchi, Luigi; Wang, Hom-Lay

    2014-02-01

    The aim of this case report was to histologically evaluate the behavior of a trabecular metal (TM) implant composed of titanium and spatial 3-dimensional tantalum (Ta) trabeculae. This study is the first human histologic case report of this implant. A TM implant was placed in a 54-year-old woman exhibiting moderate chronic periodontitis. After periodontal treatment, the implant was inserted under favorable clinical conditions. Patient was not seen for 4 months because of unrelated breast reduction surgery. At the surgical reopening, periimplant inflammation affecting the coronal third of the implant was observed 4 months after implant placement. With patient's consent, the implant was removed for histologic analysis. Histology highlighted a greater amount of bone in close contact with Ta trabeculae than titanium surfaces. The finding of bone formation around the Ta trabeculae suggests that trabecular metal material promotes bone ingrowth for secondary implant stability. Additional evidence is needed to confirm this observation.

  14. A 12-Month Study of Food Crops Contaminated by Heavy Metals, Lusaka, Zambia

    Holden, J. A.; Malamud, B. D.; Chishala, B. H.; Kapungwe, E.; Volk, J.; Harpp, K. S.

    2009-04-01

    We investigate heavy-metal contamination of irrigation water used for urban agriculture and subsequent contamination of food crops in Chunga, NW Lusaka, the capital of Zambia. Inhabitants of the Chunga area rely on urban agriculture as both a major source of income and food. From August 2004 to July 2005, monthly samples of irrigation water used and edible portions of food crops were taken from a farmer's plot at Chunga. The food crops (cabbage, Chinese cabbage, pumpkin leaves, rape, sweet potato leaves and tomatoes) are grown using irrigation throughout the year. Irrigation water samples and digested food crop samples were analysed using ICP-MS at the Department of Geology, Colgate University, USA for Al, V, Cr, Mn, Fe, Co, Ni, Cu, Zn, As, Se, Cd, Ba, Hg, Tl, Pb, and U. We find heavy-metal concentrations present in both irrigation water and food crop samples. Zambian sample concentrations were compared to Zambian and international legislative and guideline limits for concentrations of heavy metals in industrial effluent, heavy metals in irrigation water and heavy metals in foods. In irrigation water samples recommended national and/or international legislative limits for Al, Cr, Mn, Fe, Cu, Hg, Pb and U were exceeded. Limits for Hg were exceeded by up to 130 times. There were heavy-metal concentrations above recommended limits in food crops for Cr, Fe, Ni, Cu, Zn, Cd, Hg and Pb throughout the different food crops grown and throughout the year. In all 14 samples recommended limits for Cr, Fe and Hg were exceeded. Zambian legislated limits for food crops were exceeded by up to 16 times for Pb and 58 times for Hg. The results of this study show that heavy metal contamination is present in irrigation water used and food crops grown in urban agriculture in Chunga, Lusaka, Zambia. Recommended maximum limits for heavy metals in irrigation water and food are exceeded in some samples indicating there may be a risk to health.

  15. Protective efficacy of standard Edmonston-Zagreb measles vaccination in infants aged 4.5 months: interim analysis of a randomised clinical trial

    Martins, C.L.; Garly, May-Lill; Bale, C.

    2008-01-01

    -Bissau. Intervention Measles vaccination using standard titre Edmonston-Zagreb vaccine at 4.5 months of age. Main outcome measures Vaccine efficacy against measles infection, admission to hospital for measles, and measles mortality before standard vaccination at 9 months of age. Results 28% of the children tested at 4...... children developed measles; 19% of unvaccinated children had measles before 9 months of age. The monthly incidence of measles among the 441 children enrolled in the treatment arm was 0.7% and among the 892 enrolled in the control arm was 3.1%. Early vaccination with the Edmonston-Zagreb measles vaccine...... against measles may be low and severe outbreaks of measles can occur in infants before the recommended age of vaccination at 9 months. Outbreaks of measles may be curtailed by measles vaccination using the Edmonston-Zagreb vaccine as early as 4.5 months of age. Trial registration Clinical Trials NCT...

  16. Protective efficacy of standard Edmonston-Zagreb measles vaccination in infants aged 4.5 months: interim analysis of a randomised clinical trial.

    Martins, Cesário L; Garly, May-Lill; Balé, Carlito; Rodrigues, Amabelia; Ravn, Henrik; Whittle, Hilton C; Lisse, Ida M; Aaby, Peter

    2008-07-24

    To examine the protective efficacy of measles vaccination in infants in a low income country before 9 months of age. Randomised clinical trial. 1333 infants aged 4.5 months: 441 in treatment group and 892 in control group. Urban area in Guinea-Bissau. Measles vaccination using standard titre Edmonston-Zagreb vaccine at 4.5 months of age. Vaccine efficacy against measles infection, admission to hospital for measles, and measles mortality before standard vaccination at 9 months of age. 28% of the children tested at 4.5 months of age had protective levels of maternal antibodies against measles at enrolment. After early vaccination against measles 92% had measles antibodies at 9 months of age. A measles outbreak offered a unique situation for testing the efficacy of early measles vaccination. During the outbreak, 96 children developed measles; 19% of unvaccinated children had measles before 9 months of age. The monthly incidence of measles among the 441 children enrolled in the treatment arm was 0.7% and among the 892 enrolled in the control arm was 3.1%. Early vaccination with the Edmonston-Zagreb measles vaccine prevented infection; vaccine efficacy for children with serologically confirmed measles and definite clinical measles was 94% (95% confidence interval 77% to 99%), for admissions to hospital for measles was 100% (46% to 100%), and for measles mortality was 100% (-42% to 100%). The number needed to treat to prevent one case of measles between ages 4.5 months and 9 months during the epidemic was 7.2 (6.8 to 9.2). The treatment group tended to have lower overall mortality (mortality rate ratio 0.18, 0.02 to 1.36) although this was not significant. In low income countries, maternal antibody levels against measles may be low and severe outbreaks of measles can occur in infants before the recommended age of vaccination at 9 months. Outbreaks of measles may be curtailed by measles vaccination using the Edmonston-Zagreb vaccine as early as 4.5 months of age. TRIAL

  17. Lethal concentrations of heavy metals in tissue of earthworms. Interim report No. 1, June-July 1987

    Bouche, M.B.; Brun, P.; Gal, J.Y.; Reza, A.

    1987-07-01

    The objective of this phase of Toxicological Research on Lethal Concentrations of Heavy Metals in Tissue of Earthworms is to improve both ecotoxicological tests in a chemically defined medium and a procedure of bioavailability study in field. In this first period the authors worked on breeding stock of earthworms (species Eisenia fetida andrei) in decomposing manure heaps to increase them and make them grow. They also installed two chambers with thermostats fixed at 20 C to do toxicity tests and chose chemical species of heavy-metal contaminants. For field procedure, they improved a practical way to sample both earthworms and soil in very close connections, avoiding artifacts. For both field procedure and laboratory tests, they tried to standardize a method to dissolve earthworms in acids and to analyze the concentrations of heavy metals inside. A preliminary set of samples in calcareous soils was started and analysis of them are in progress. For lab tests, the first part of the test (preliminary test) was started with the different contaminants (cadmium, copper, arsenic, mercury) in an artificial medium named Artisol.

  18. Interim report

    NONE

    1985-06-01

    This Interim Report summarizes the research and development activities of the Superconducting Super Collider project carried out from the completion of the Reference Designs Study (May 1984) to June 1985. It was prepared by the SSC Central Design Group in draft form on the occasion of the DOE Annual Review, June 19--21, 1985. Now largely organized by CDG Divisions, the bulk of each chapter documents the progress and accomplishments to date, while the final section(s) describe plans for future work. Chapter 1, Introduction, provides a basic brief description of the SSC, its physics justification, its origins, and the R&D organization set up to carry out the work. Chapter 2 gives a summary of the main results of the R&D program, the tasks assigned to the four magnet R&D centers, and an overview of the future plans. The reader wishing a quick look at the SSC Phase I effort can skim Chapter 1 and read Chapter 2. Subsequent chapters discuss in more detail the activities on accelerator physics, accelerator systems, magnets and cryostats, injector, detector R&D, conventional facilities, and project planning and management. The magnet chapter (5) documents in text and photographs the impressive progress in successful construction of many model magnets, the development of cryostats with low heat leaks, and the improvement in current-carrying capacity of superconducting strand. Chapter 9 contains the budgets and schedules of the COG Divisions, the overall R&D program, including the laboratories, and also preliminary projections for construction. Appendices provide information on the various panels, task forces and workshops held by the CDG in FY 1985, a bibliography of COG and Laboratory reports on SSC and SSC-related work, and on private industrial involvement in the project.

  19. Interim Report on Metallic Component Margins Under High Seismic Loads. Survey of Existing Practices and Status of Benchmark Work

    2015-01-01

    OECD/NEA/CSNI Working Group on Integrity and Ageing of Components and Structures (WGIAGE) has the main mission to advance the current understanding of those aspects relevant to ensuring the integrity of structures, systems and components under design and beyond design loads, to provide guidance in choosing the optimal ways of dealing with challenges to the integrity of operating as well as new nuclear power plants, and to make use of an integrated approach to design, safety and plant life management. The activity (CAPS) of the WGIAGE group, entitled 'Metallic Component Margins under High Seismic Loads (MECOS)', was initially proposed by the metal sub-group of WGIAGE and approved by the CSNI in June 2012 as a Fukushima activity (F-CAPS). The proposal is aimed to assess the consequences of external hazards on plant safety. The main objectives of the MECOS project were to quantify the existing margins in seismic analysis of safety class components for high seismic loads and assess the existing design practices within a benchmark activity. The first phase of MECOS work included a survey on the existing seismic regulations and design analysis methods in the member countries. The survey was conducted by means of a questionnaire and a total of 24 questions were asked. The questionnaire consists of three parts: Seismic Input, Seismic Design Basis, and Beyond Seismic Design Basis. The majority of the respondents use the Standard or Modified Shape Spectrum and only a few countries are using the Uniform Seismic Hazard Spectra (UHS) in their seismic design regulations. All of the respondents have minimum seismic demand in their national or adopted standards. The number of defined and used seismic levels for the design of mechanical components is one or two. Almost all of the respondents are using combined testing and analysis methods for seismic qualification and design. Some countries (e.g. Canada, Finland, USA, France, Japan and UK) have specific requirements for

  20. The Interim Financial Statements: The Case of Greece

    Rogdaki, E.I.; Kazantzis, Ch.

    1999-01-01

    The following paper refers to the accounting and auditing issues which emerge in the preparation of the interim financial statements of the companies: Firstly, the interim financial statements are defined as being the financial statements that provide useful information about the financial position and the financial results of a company which are realized and accrued during the fiscal year. The interim financial statements can be prepared on a monthly basis, on a quarterly basis or covering a...

  1. Choosing a spent fuel interim storage system

    Roland, V.; Hunter, I.

    2001-01-01

    The Transnucleaire Group has developed different modular solutions to address spent fuel interim storage needs of NPP. These solutions, that are present in Europe, USA and Asia are metal casks (dual purpose or storage only) of the TN 24 family and the NUHOMS canister based system. It is not always simple for an operator to sort out relevant choice criteria. After explaining the basic designs involved on the examples of the TN 120 WWER dual purpose cask and the NUHOMS 56 WWER for WWER 440 spent fuel, we shall discuss the criteria that govern the choice of a given spent fuel interim storage system from the stand point of the operator. In conclusion, choosing and implementing an interim storage system is a complex process, whose implications can be far reaching for the long-term success of a spent fuel management policy. (author)

  2. AMS INSIGHT--absorbable metal stent implantation for treatment of below-the-knee critical limb ischemia: 6-month analysis.

    Bosiers, Marc; Peeters, Patrick; D'Archambeau, Olivier; Hendriks, Jeroen; Pilger, Ernst; Düber, Christoph; Zeller, Thomas; Gussmann, Andreas; Lohle, Paul N M; Minar, Erich; Scheinert, Dierk; Hausegger, Klaus; Schulte, Karl-Ludwig; Verbist, Jürgen; Deloose, Koen; Lammer, J

    2009-05-01

    Endoluminal treatment of infrapopliteal artery lesions is a matter of controversy. Bioabsorbable stents are discussed as a means to combine mechanical prevention of vessel recoil with the advantages of long-term perspectives. The possibility of not having a permanent metallic implant could permit the occurrence of positive remodeling with lumen enlargement to compensate for the development of new lesions. The present study was designed to investigate the safety of absorbable metal stents (AMSs) in the infrapopliteal arteries based on 1- and 6-month clinical follow-up and efficacy based on 6-month angiographic patency. One hundred seventeen patients with 149 lesions with chronic limb ischemia (CLI) were randomized to implantation of an AMS (60 patients, 74 lesions) or stand-alone percutaneous transluminal angioplasty (PTA; 57 patients, 75 lesions). Seven PTA-group patients "crossed over" to AMS stenting. The study population consisted of patients with symptomatic CLI (Rutherford categories 4 and 5) and de novo stenotic (>50%) or occlusive atherosclerotic disease of the infrapopliteal arteries who presented with a reference diameter of between 3.0 and 3.5 mm and a lesion length of <15 mm. The primary safety endpoint was defined as absence of major amputation and/or death within 30 days after index intervention and the primary efficacy endpoint was the 6-month angiographic patency rate as confirmed by core-lab quantitative vessel analysis. The 30-day complication rate was 5.3% (3/57) and 5.0% (3/60) in patients randomized for PTA alone and PTA followed by AMS implantation, respectively. On an intention-to-treat basis, the 6-month angiographic patency rate for lesions treated with AMS (31.8%) was significantly lower (p = 0.013) than the rate for those treated with PTA (58.0%). Although the present study indicates that the AMS technology can be safely applied, it did not demonstrate efficacy in long-term patency over standard PTA in the infrapopliteal vessels.

  3. Spent fuel interim management: 1995 update

    Anderson, C.K.

    1995-01-01

    The problems of interim away-from-reactor spent fuel storage and storage in spent fuel pools at the reactor site are discussed. An overview of the state-of-the-art in the USA, Europe, and Japan is presented. The technical facilities for away-from-reactor storage are briefly described, including wet storage pools, interactive concrete systems, metallic containers, and passive concrete systems. Reprocessing technologies are mostly at the design stage only. It is predicted that during the 20 years to come, about 50 000 tonnes of spent fuel will be stored at reactor sites regardless of the advance of spent fuel reprocessing or interim storage projects. (J.B.). 4 tabs., 2 figs

  4. CMM Interim Check (U)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-03-23

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length. Unfortunately, several nonconformance reports have been generated to document the discovery of a certified machine found out of tolerance during a calibration closeout. In an effort to reduce risk to product quality two solutions were proposed – shorten the calibration cycle which could be costly, or perform an interim check to monitor the machine’s performance between cycles. The CMM interim check discussed makes use of Renishaw’s Machine Checking Gauge. This off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. Data was gathered, analyzed, and simulated from seven machines in seventeen different configurations to create statistical process control run charts for on-the-floor monitoring.

  5. The Nord interim store

    Leushacke, D.F.; Rittscher, D.

    1996-01-01

    In line with the decision taken in 1990 to shut down and decommission the Greifswald and Rheinsberg Nuclear Power Stations, the waste management concept of the Energiewerke Nord is based on direct and complete decommissioning of the six shut down reactor units within the next fifteen years. One key element of this concept is the construction and use of the Zwischenlager Nord (Nord Interim Store, ZLN) for holding the existing nuclear fuels and for interim and decay storage of the radioactive materials arising in decommissioning and demolition. The owner and operator of the store is Energiewerke Nord GmbH. The interim store has the functions of a processing and Energiewerke Nord GmbH. The interim store has the functions of a processing and treatment station and buffer store for the flows of residues arising. As a radioactive waste management station, it accommodates nuclear fuels, radioactive waste or residues which are not treated any further. It is used as a buffer store to allow the materials accumulating in disassembly to be stored temporarily before or after treatment in order to ensure continuous loading of the treatment plants. When operated as a processing station, the ZLN is able to handle nearly all types of radioactive waste and residues arising, except for nuclear fuels. These installations allow the treatment of radioactive residues to be separated from the demolition work both physically and in time. The possibilities of interium storage and buffer storage of untreated waste and waste packages make for high flexibility in logistics and waste management strategy. (orig.) [de

  6. Interim storage study report

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration.

  7. Interim storage report

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration

  8. Spent fuel interim storage

    Bilegan, Iosif C.

    2003-01-01

    The official inauguration of the spent fuel interim storage took place on Monday July 28, 2003 at Cernavoda NNP. The inaugural event was attended by local and central public authority representatives, a Canadian Government delegation as well as newsmen from local and central mass media and numerous specialists from Cernavoda NPP compound. Mr Andrei Grigorescu, State Secretary with the Economy and Commerce Ministry, underlined in his talk the importance of this objective for the continuous development of nuclear power in Romania as well as for Romania's complying with the EU practice in this field. Also the excellent collaboration between the Canadian contractor AECL and the Romanian partners Nuclear Montaj, CITON, UTI, General Concret in the accomplishment of this unit at the planned terms and costs. On behalf of Canadian delegation, spoke Minister Don Boudria. He underlined the importance which the Canadian Government affords to the cooperation with Romania aiming at specific objectives in the field of nuclear power such as the Cernavoda NPP Unit 2 and spent fuel interim storage. After traditional cutting of the inaugural ribbon by the two Ministers the festivities continued on the Cernavoda NPP Compound with undersigning the documents regarding the project completion and a press conference

  9. Restenosis in coronary bare metal stents. Importance of time to follow-up: a comparison of coronary angiograms 6 months and 4 years after implantation

    Jørgensen, Erik; Helqvist, Steffen; Kløvgaard, Lene

    2008-01-01

    Objectives. Angiographic late lumen loss measured 6 to 9 month after bare metal stent implantation in the coronary arteries is a validated restenosis parameter. Design. We performed a second angiographic follow-up after 4 years in event free survivors from the DANSTENT trial cohort. Results......-sectional vessel area and a 39% reduction of the binary restenosis rate over time. Conclusions. Instent late lumen loss in bare metal stents decreases spontaneously over time. Maturation of early hyperplastic tissue reaction after stent implantation with subsequent thinning of fibrotic tissue might explain...

  10. ETF interim design review

    Steiner, D.; Rutherford, P.H.

    1980-01-01

    A three-day ETF Interim Design Review was conducted on July 23-25, 1980, at the Sheraton Potomac Inn in Rockville, Maryland. The intent of the review was to provide a forum for an in-depth assessment and critique of all facets of the ETF design by members of the fusion community. The review began with an opening plenary session at which an overview of the ETF design was presented by D. Steiner, manager of the ETF Design Center, complemented by a physics overview by P.H. Rutherford, chairman of the ETF/INTOR Physics Committee. This was followed by six concurrent review sessions over the next day and a half. The review closed with a plenary session at which the Design Review Board presented its findings. This document consists of the viewgraphs for the opening plenary session and an edited version of the presentations made by Steiner and Rutherford

  11. Interim geotechnical data report

    1986-01-01

    This issue, the Interim Geotechnical Field Data Report, presents information obtained from the geotechnical activities at the WIPP site underground facilities since the last quarterly report. It also includes cumulative plots which contain all previous data. Finally, it continues the geotechnical analyses and interpretations of the data. The GFDR is organized into two principal parts. The first part, Geotechnical Field Data, presents in graphical form all the data collected since April 1982 from the geomechanical instruments. Presented in the second part, Evaluation and Analyses, are preliminary interpretations and analyses of the data. In this report, continuing geotechnical assessment of all the facility features is presented. Also included in the second part are separate sections on evaluation and interpretation of the instrumentation measurements, and an updated description and evaluation of observed behavior of the underground openings

  12. Federal Interim Storage program

    Johnson, E.R.; McBride, J.A.

    1984-01-01

    The DOE has developed a program for providing Federal Interim Storage servies for spent nuclear fuel which complies with the requirements of the Nuclear Waste Policy Act of 1982. Although very little constructive activity in providing storage facilities can be undertaken by DOE until fuel has been certified by NRC as eligible for FIS, DOE planning and background information is such as to provide reasonable assurance that its obligations can be fulfilled when the required certifications have been issued. A fee structure providing fuel recovery of all costs associated with the FIS program, as required by the Act, has been developed. It provides for an equitable distribution of costs among users, based on the quantity of fuel requiring storage

  13. Retention of long-term interim restorations with sodium fluoride enriched interim cement

    Strash, Carolyn

    Purpose: Interim fixed dental prostheses, or "provisional restorations", are fabricated to restore teeth when definitive prostheses are made indirectly. Patients undergoing extensive prosthodontic treatment frequently require provisionalization for several months or years. The ideal interim cement would retain the restoration for as long as needed and still allow for ease of removal. It would also avoid recurrent caries by preventing demineralization of tooth structure. This study aims to determine if adding sodium fluoride varnish to interim cement may assist in the retention of interim restorations. Materials and methods: stainless steel dies representing a crown preparation were fabricated. Provisional crowns were milled for the dies using CAD/CAM technology. Crowns were provisionally cemented onto the dies using TempBond NE and NexTemp provisional cements as well as a mixture of TempBond NE and Duraphat fluoride varnish. Samples were stored for 24h then tested or thermocycled for 2500 or 5000 cycles before being tested. Retentive strength of each cement was recorded using a universal testing machine. Results: TempBond NE and NexTemp cements performed similarly when tested after 24h. The addition of Duraphat significantly decreased the retention when added to TempBond NE. NexTemp cement had high variability in retention over all tested time periods. Thermocycling for 2500 and 5000 cycles significantly decreased the retention of all cements. Conclusions: The addition of Duraphat fluoride varnish significantly decreased the retention of TempBond NE and is therefore not recommended for clinical use. Thermocycling significantly reduced the retention of TempBond NE and NexTemp. This may suggest that use of these cements for three months, as simulated in this study, is not recommended.

  14. Interim Design Report

    Choubey, S.; Goswami, S.; Berg, J.S.; Fernow, R.; Gallardo, J.C.; Gupta, R.; Kirk, H.; Simos, N.; Souchlas, N.; Ellis, M.; Kyberd, P.; Benedetto, E.; Fernandez-Martinez, E.; Efthymiopoulos, I.; Garoby, R.; Gilardoni, S.; Martini, M.; Prior, G.; Ballett, P.; Pascoli, S.; Bross, A.; Geer, S.; Johnstone, C.; Kopp, J.; Mokhov, N.; Morfin, J.; Neuffer, D.; Parke, S.; Popovic, M.; Strait, J.; Striganov, S.; Blondel, A.; Dufour, F.; Laing, A.; Soler, F.J.P; Lindner, M.; Schwetz, T.; Alekou, A.; Apollonio, M.; Aslaninejad, M.; Bontoiu, C.; Dornan, P.; Eccleston, R.; Kurup, A.; Long, K.; Pasternak, J.; Pozimski, J.; Bogacz, A.; Morozov, V.; Roblin, Y.; Bhattacharya, S.; Majumdar, D.; Mori, Y.; Planche, T.; Zisman, M.; Cline, D.; Stratakis, D.; Ding, X.; Coloma, P.; Donini, A.; Gavela, B.; Lopez Pavon, J.; Maltoni, M.; Bromberg, C.; Bonesini, M.; Hart, T.; Kudenko, Y.; Mondal, N.; Antusch, S.; Blennow, M.; Ota, T.; Abrams, R.J.; Ankenbrandt, C.M.; Beard, K.B.; Cummings, M.A.C.; Flanagan, G.; Johnson, R.P.; Roberts, T.J.; Yoshikawa, C.Y.; Migliozzi, P.; Palladino, V.; de Gouvea, A.; Graves, V.B.; Kuno, Y.; Peltoniemi, J.; Blackmore, V.; Cobb, J.; Witte, H.; Mezzetto, M.; Rigolin, S.; McDonald, K.T.; Coney, L.; Hanson, G.; Snopok, P.; Tortora, L.; Andreopoulos, C.; Bennett, J.R.J.; Brooks, S.; Caretta, O.; Davenne, T.; Densham, C.; Edgecock, R.; Kelliher, D.; Loveridge, P.; McFarland, A.; Machida, S.; Prior, C.; Rees, G.; Rogers, C.; Thomason, J.W.G.; Booth, C.; Skoro, G.; Karadzhov, Y.; Matev, R.; Tsenov, R.; Samulyak, R.; Mishra, S.R.; Petti, R.; Dracos, M.; Yasuda, O.; Agarwalla, S.K.; Cervera-Villanueva, A.; Gomez-Cadenas, J.J.; Hernandez, P.; Li, T.; Martin-Albo, J.; Huber, P.; Back, J.; Barker, G.; Harrison, P.; Meloni, D.; Tang, J.; Winter, W.

    2011-01-01

    The International Design Study for the Neutrino Factory (the IDS-NF) was established by the community at the ninth "International Workshop on Neutrino Factories, super-beams, and beta- beams" which was held in Okayama in August 2007. The IDS-NF mandate is to deliver the Reference Design Report (RDR) for the facility on the timescale of 2012/13. In addition, the mandate for the study [3] requires an Interim Design Report to be delivered midway through the project as a step on the way to the RDR. This document, the IDR, has two functions: it marks the point in the IDS-NF at which the emphasis turns to the engineering studies required to deliver the RDR and it documents baseline concepts for the accelerator complex, the neutrino detectors, and the instrumentation systems. The IDS-NF is, in essence, a site-independent study. Example sites, CERN, FNAL, and RAL, have been identified to allow site-specific issues to be addressed in the cost analysis that will be presented in the RDR. The choice of example sites shou...

  15. Radioactive waste interim storage in Germany

    2015-12-01

    The short summary on the radioactive waste interim storage in Germany covers the following issues: importance of interim storage in the frame of radioactive waste management, responsibilities and regulations, waste forms, storage containers, transport of vitrified high-level radioactive wastes from the reprocessing plants, central interim storage facilities (Gorleben, Ahaus, Nord/Lubmin), local interim storage facilities at nuclear power plant sites, federal state collecting facilities, safety, radiation exposure in Germany.

  16. 7 CFR 1735.75 - Interim financing.

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1735.75 Section 1735.75... Involving Loan Funds § 1735.75 Interim financing. (a) A borrower may submit a written request for RUS approval of interim financing if it is necessary to close an acquisition before the loan to finance the...

  17. 7 CFR 1738.21 - Interim financing.

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1738.21 Section 1738.21... Interim financing. (a) Upon notification by RUS that an applicant's application is considered complete, the applicant may enter into an interim financing agreement with a lender other than RUS or use its...

  18. Evaluation of systemic metal diffusion after spinal pedicular fixation with titanium alloy and stainless steel system: a 36-month experimental study in sheep.

    Brayda-Bruno, M; Fini, M; Pierini, G; Giavaresi, G; Rocca, M; Giardino, R

    2001-01-01

    It is known that titanium alloys cause more extensive local metallosis due to fretting corrosion than stainless steel implants. The aim of the present study was to investigate possible systemic metal releases (Ti, Al, V, Cr, Ni) in sheep where L4-L5 were implanted with titanium alloy (Ti6Al4V, ASTM F 136) and stainless steel (AISI 316 L). 16 sheep were used: 8 were implanted with Ti6Al4V and 8 with stainless steel. At 6, 12, 24 and 36 months, the following examinations were performed: histology, atomic absorption spectrophotometry (AAS) and scanning electron microscopy (SEM), on liver, lung, kidney, brain, spleen and lumbo-aortic lymph nodes. Hair, urine and arteria blood samples were also analysed by AAS before implantation and at sacrifices. A histologic and ultrastructural study was performed on peri-implant tissues, too. Particular attention was paid to avoid contamination from dissection instruments or use of containers. In basal and in samples at 6 and 12 months, no metals were found in blood, urine, hair or other target tissues of the animals implanted with either Ti6Al4V or stainless steel. Regarding Al, V, Co and Ni, negative results in all tissues and body fluids were obtained also at 24 and 36 months. On the contrary, Ti traces were found in lumbo-aortic lymph nodes and lungs of one sheep only (10 and 30 ng/g, respectively) at 24 months. At 36 months, a systemic diffusion of Ti was observed in all tissues of both sheep instrumented with Ti6Al4V (2-16.5 ng/g), except for body fluids and hair. Metal research in target tissues by light and SEM micro-probe analysis provided negative results. Current data suggest that the amount of Ti found in organs after stable pedicular fixation is extremely low and not biologically available. This observation would lead us to exclude the hypothesis of any toxic reaction and such a release seems to be due to the passive diffusion through lymphatic fluids. Additional studies are needed to confirm if this long-term release

  19. Application of dose evaluation of the MCNP code for interim spent fuel cask storage facility

    Kosako, Toshiso; Iimoto, Takeshi; Ishikawa, Satoshi; Tsuboi, Takafumi; Teramura, Masahiro; Okamura, Tomomi; Narumiya, Yoshiyuki

    2007-01-01

    The interim storage facility for spent fuel metallic cask is designed as a concrete building structure with air inlet and outlet for circulating the natural cooling. The feature of the interim storage facility is big capacity of spent fuel at several thousands MTU and restricted site usage. It is important to evaluate realistic dose rate in shielding design of the interim storage facility, therefore the three-dimensional continuous-energy Monte Carlo radiation transport code MCNP that exactly treating the complicated geometry was applied. The validation of dose evaluation for interim storage facility by MCNP code were performed by three kinds of neutron shielding benchmark experiments; cask shadow shielding experiment, duct streaming experiment and concrete deep penetration experiment. Dose rate distributions at each benchmark were measured and compared with the calculated results. The comparison showed a good consistency between calculation and experiment results. (author)

  20. SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

    Norton, S.H.

    2010-01-01

    CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford

  1. SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

    NORTON SH

    2010-02-23

    CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford

  2. Interim Hanford Waste Management Technology Plan

    1985-09-01

    The Interim Hanford Waste Management Technology Plan (HWMTP) is a companion document to the Interim Hanford Waste Management Plan (HWMP). A reference plan for management and disposal of all existing and certain projected future radioactive Hanford Site Defense Wastes (HSDW) is described and discussed in the HWMP. Implementation of the reference plan requires that various open technical issues be satisfactorily resolved. The principal purpose of the HWMTP is to present detailed descriptions of the technology which must be developed to close each of the technical issues associated with the reference plan identified in the HWMP. If alternative plans are followed, however, technology development efforts including costs and schedules must be changed accordingly. Technical issues addressed in the HWMTP and HWMP are those which relate to disposal of single-shell tank wastes, contaminated soil sites, solid waste burial sites, double-shell tank wastes, encapsulated 137 CsCl and 90 SrF 2 , stored and new solid transuranic (TRU) wastes, and miscellaneous wastes such as contaminated sodium metal. Among the high priority issues to be resolved are characterization of various wastes including early determination of the TRU content of future cladding removal wastes; completion of development of vitrification (Hanford Waste Vitrification Plant) and grout technology; control of subsidence in buried waste sites; and development of criteria and standards including performance assessments of systems proposed for disposal of HSDW. Estimates of the technology costs shown in this report are made on the basis that all identified tasks for all issues associated with the reference disposal plan must be performed. Elimination of, consolidation of, or reduction in the scope of individual tasks will, of course, be reflected in corresponding reduction of overall technology costs

  3. ITER Conceptual design: Interim report

    1990-01-01

    This interim report describes the results of the International Thermonuclear Experimental Reactor (ITER) Conceptual Design Activities after the first year of design following the selection of the ITER concept in the autumn of 1988. Using the concept definition as the basis for conceptual design, the Design Phase has been underway since October 1988, and will be completed at the end of 1990, at which time a final report will be issued. This interim report includes an executive summary of ITER activities, a description of the ITER device and facility, an operation and research program summary, and a description of the physics and engineering design bases. Included are preliminary cost estimates and schedule for completion of the project

  4. Agenda 21 interim balance, 1997

    Van Vuuren, D.P.; Bakkes, J.A.

    1997-10-01

    Five years after the `United Nations Conference on Environment and Development (UNCED)`, an interim balance was drawn up to see what was done to meet the ambitious challenges adopted in Agenda 21 during this conference. Such a balance is presented in this report and the complementary brochure, `Developments in Sustainability 1992-1997`, reflecting societal developments and changes in environmental quality, as well as changes in responses to environmental concerns. 24 figs., 12 tabs., 68 refs.

  5. Burn site groundwater interim measures work plan.

    Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  6. A randomized controlled trial of interim methadone maintenance.

    Schwartz, Robert P; Highfield, David A; Jaffe, Jerome H; Brady, Joseph V; Butler, Carol B; Rouse, Charles O; Callaman, Jason M; O'Grady, Kevin E; Battjes, Robert J

    2006-01-01

    Effective alternatives to long waiting lists for entry into methadone hydrochloride maintenance treatment are needed to reduce the complications of continuing heroin dependence and to increase methadone treatment entry. To compare the effectiveness of interim methadone maintenance with that of the usual waiting list condition in facilitating methadone treatment entry and reducing heroin and cocaine use and criminal behavior. Randomized, controlled, clinical trial using 2 conditions, with treatment assignment on a 3:2 basis to interim maintenance-waiting list control. A methadone treatment program in Baltimore. A total of 319 individuals meeting the criteria for current heroin dependence and methadone maintenance treatment. Participants were randomly assigned to either interim methadone maintenance, consisting of an individually determined methadone dose and emergency counseling only for up to 120 days, or referral to community-based methadone treatment programs. Entry into comprehensive methadone maintenance therapy at 4 months from baseline; self-reported days of heroin use, cocaine use, and criminal behavior; and number of urine drug test results positive for heroin and cocaine at the follow-up interview conducted at time of entry into comprehensive methadone treatment (or at 4 months from baseline for participants who did not enter regular treatment). Significantly more participants assigned to the interim methadone maintenance condition entered comprehensive methadone maintenance treatment by the 120th day from baseline (75.9%) than those assigned to the waiting list control condition (20.8%) (Pmethadone maintenance results in a substantial increase in the likelihood of entry into comprehensive treatment, and is an effective means of reducing heroin use and criminal behavior among opioid-dependent individuals awaiting entry into a comprehensive methadone treatment program.

  7. 76 FR 58790 - Notice of Interim Approval

    2011-09-22

    ... to the customers. Rate Scenario 3--Original Cumberland Marketing Policy The third rate alternative... an interim basis to the customers. Rate Scenario 3--Original Cumberland Marketing Policy The third... allocated on an interim basis to the customers. Rate Scenario 3--Original Cumberland Marketing Policy The...

  8. Addendum to IFMIF-CDA interim report

    Maekawa, Hiroshi; Ida, Mizuho [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; eds.

    1996-08-01

    During the second IFMIF-CDA Design Integration Workshop, the conceptual design and contents of `IFMIF-CDA Interim Report` were examined and discussed at both general and group meetings. Based on these discussion, the final IFMIF-CDA Report will be modified from the `Interim Report`. This report describes the outline of these modification. (author)

  9. Addendum to IFMIF-CDA interim report

    Maekawa, Hiroshi; Ida, Mizuho

    1996-08-01

    During the second IFMIF-CDA Design Integration Workshop, the conceptual design and contents of 'IFMIF-CDA Interim Report' were examined and discussed at both general and group meetings. Based on these discussion, the final IFMIF-CDA Report will be modified from the 'Interim Report'. This report describes the outline of these modification. (author)

  10. Fusion Breeder Program interim report

    Moir, R.; Lee, J.D.; Neef, W.

    1982-01-01

    This interim report for the FY82 Fusion Breeder Program covers work performed during the scoping phase of the study, December, 1981-February 1982. The goals for the FY82 study are the identification and development of a reference blanket concept using the fission suppression concept and the definition of a development plan to further the fusion breeder application. The context of the study is the tandem mirror reactor, but emphasis is placed upon blanket engineering. A tokamak driver and blanket concept will be selected and studied in more detail during FY83

  11. Solid waste burial grounds interim safety analysis

    Saito, G.H.

    1994-01-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment

  12. Solid waste burial grounds interim safety analysis

    Saito, G.H.

    1994-10-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment.

  13. Monthly variation in the Bioaccumulation of heavy metals and other safety issues in some marine and fresh water fish species in Ghana

    Arthur, W.

    2014-07-01

    Fish is one of the major sources of animal protein in Ghana and the fisheries industry is vital to the economy of the country. Unfortunately, most of the aquatic systems in Ghana are being polluted with domestic and industrial wastes which results in bioaccumulation of heavy metals in fish species. The traditional method for preserving fish in the country is by hot smoking or smoke drying, through freezing may be preferred where facilities are available. The presence of high levels of heavy metals in both fresh and smoked fish as well as other fish products is a matter of public health concern in Ghana. Variations in the level of bioaccumulation of heavy metals in both fresh and smoked marine fish, Sebastes marinus (red fish) and fresh water fish, Oreochromis niloticus (tilapia) caught off the coast of James Town in Accra and from the Volta river at Kpong respectively were monitored monthly from September 2013 to March 2014. Extension of two shelf life of the smoked fish species by gamma irradiation was also studied during 4 weeks of low temperature (5± 1 C ) storage by refrigeration. The total concentration of Iron (Fe), Zinc (Zn), Copper (Cu), Magnesium (Mg), Manganese (Mn), Cobalt (Co), Cadmium (Cd), Chromium (Cr), Arsenic (As) and Mercury (Hg) in the fish species as well as in their muscles, gills and bones were determined by Flame or Hydride Generation Atomic Absorption Spectrophotometry. The moisture content, pH, sensory analysis and population of aerobic mesophiles (on PCA), yeast and moulds (on OGYE), Escherichia coli (on EMB), Staphylococcus aureus (on BPA) and Salmonella (on XLD) in fresh fish, and smoked fish after treatment with 1, 2 and 3kGy of gamma irradiation and during storage were determined. Four patterns in the bioaccumulation of heavy metals in both Sebastes marinus and Oreochromis niloticus were observed over the 6 months monitoring period. Fe, Cu, Co and Cr accumulated heavily in the fish species during September and October after which the

  14. Interim and final storage casks

    Stumpfrock, L.; Kockelmann, H.

    2012-01-01

    The disposal of radioactive waste is a huge social challenge in Germany and all over the world. As is well known the search for a site for a final repository for high-level waste in Germany is not complete. Therefore, interim storage facilities for radioactive waste were built at plant sites in Germany. The waste is stored in these storage facilities in appropriate storage and transport casks until the transport in a final repository can be carried out. Licensing of the storage and transport casks aimed for use in the public space is done according to the traffic laws and for handling in the storage facility according to nuclear law. Taking into account the activity of the waste to be stored, different containers are in use, so that experience is available from the licensing and operation in interim storage facilities. The large volume of radioactive waste to be disposed of after the shut-down of power generation in nuclear power stations makes it necessary for large quantities of licensed storage and transport casks to be provided soon.

  15. Glass packages in interim storage

    Jacquet-Francillon, N.

    1994-10-01

    This report summarize the current state of knowledge concerning the behavior of type C waste packages consisting of vitrified high-level solutions produced by reprocessing spent fuel. The composition and the physical and chemical properties of the feed solutions are reviewed, and the vitrification process is described. Sodium alumino-borosilicate glass compositions are generally employed - the glass used at la Hague for LWR fuel solutions, for example, contains 45 % SiO 2 . The major physical, chemical, mechanical and thermal properties of the glass are reviewed. In order to allow their thermal power to diminish, the 3630 glass packages produced (as of January 1993) in the vitrification facilities at Marcoule and La Hague are placed in interim storage for several decades. The actual interim storage period has not been defined, as it is closely related to the concept and organization selected for the final destination of the packages: a geological repository. The glass behavior under irradiation is described. Considerable basic and applied research has been conducted to assess the aqueous leaching behavior of nuclear containment glass. The effects of various repository parameters (temperature, flow rate, nature of the environmental materials) have been investigated. The experimental findings have been used to specify a model describing the kinetics of aqueous corrosion of the glass. More generally all the ''source term'' models developed in France by the CEA or by ANDRA are summarized. (author). 152 refs., 33 figs

  16. 13 CFR 120.890 - Source of interim financing.

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Source of interim financing. 120... Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may use interim financing for all Project costs except the Borrower's contribution. Any source (including...

  17. Interim reliability evaluation program (IREP)

    Carlson, D.D.; Murphy, J.A.

    1981-01-01

    The Interim Reliability Evaluation Program (IREP), sponsored by the Office of Nuclear Regulatory Research of the US Nuclear Regulatory Commission, is currently applying probabilistic risk analysis techniques to two PWR and two BWR type power plants. Emphasis was placed on the systems analysis portion of the risk assessment, as opposed to accident phenomenology or consequence analysis, since the identification of risk significant plant features was of primary interest. Traditional event tree/fault tree modeling was used for the analysis. However, the study involved a more thorough investigation of transient initiators and of support system faults than studies in the past and substantially improved techniques were used to quantify accident sequence frequencies. This study also attempted to quantify the potential for operator recovery actions in the course of each significant accident

  18. Fit of interim crowns fabricated using photopolymer-jetting 3D printing.

    Mai, Hang-Nga; Lee, Kyu-Bok; Lee, Du-Hyeong

    2017-08-01

    The fit of interim crowns fabricated using 3-dimensional (3D) printing is unknown. The purpose of this in vitro study was to evaluate the fit of interim crowns fabricated using photopolymer-jetting 3D printing and to compare it with that of milling and compression molding methods. Twelve study models were fabricated by making an impression of a metal master model of the mandibular first molar. On each study model, interim crowns (N=36) were fabricated using compression molding (molding group, n=12), milling (milling group, n=12), and 3D polymer-jetting methods. The crowns were prepared as follows: molding group, overimpression technique; milling group, a 5-axis dental milling machine; and polymer-jetting group using a 3D printer. The fit of interim crowns was evaluated in the proximal, marginal, internal axial, and internal occlusal regions by using the image-superimposition and silicone-replica techniques. The Mann-Whitney U test and Kruskal-Wallis tests were used to compare the results among groups (α=.05). Compared with the molding group, the milling and polymer-jetting groups showed more accurate results in the proximal and marginal regions (P3D printing significantly enhanced the fit of interim crowns, particularly in the occlusal region. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  19. Early interim 18F-FDG PET in Hodgkin's lymphoma: evaluation on 304 patients

    Zinzani, Pier Luigi; Stefoni, Vittorio; Broccoli, Alessandro; Argnani, Lisa; Baccarani, Michele; Rigacci, Luigi; Puccini, Benedetta; Castagnoli, Antonio; Vaggelli, Luca; Zanoni, Lucia; Fanti, Stefano

    2012-01-01

    The use of early (interim) PET restaging during first-line therapy of Hodgkin's lymphoma (HL) in clinical practice has considerably increased because of its ability to provide early recognition of treatment failure allowing patients to be transferred to more intensive treatment regimens. Between June 1997 and June 2009, 304 patients with newly diagnosed HL (147 early stage and 157 advanced stage) were treated with the ABVD regimen at two Italian institutions. Patients underwent PET staging and restaging at baseline, after two cycles of therapy and at the end of the treatment. Of the 304 patients, 53 showed a positive interim PET scan and of these only 13 (24.5%) achieved continuous complete remission (CCR), whereas 251 patients showed a negative PET scan and of these 231 (92%) achieved CCR. Comparison between interim PET-positive and interim PET-negative patients indicated a significant association between PET findings and 9-year progression-free survival and 9-year overall survival, with a median follow-up of 31 months. Among the early-stage patients, 19 had a positive interim PET scan and only 4 (21%) achieved CCR; among the 128 patients with a negative interim PET scan, 122 (97.6%) achieved CCR. Among the advanced-stage patients, 34 showed a persistently positive PET scan with only 9 (26.4%) achieving CCR, whereas 123 showed a negative interim PET scan with 109 (88.6%) achieving CCR. Our results demonstrate the role of an early PET scan as a significant step forward in the management of patients with early-stage or advanced-stage HL. (orig.)

  20. DOE UST interim subsurface barrier technologies workshop

    1992-09-01

    This document contains information which was presented at a workshop regarding interim subsurface barrier technologies that could be used for underground storage tanks, particularly the tank 241-C-106 at the Hanford Reservation

  1. Developing new transportable storage casks for interim dry storage

    Hayashi, K.; Iwasa, K.; Araki, K.; Asano, R.

    2004-01-01

    Transportable storage metal casks are to be consistently used during transport and storage for AFR interim dry storage facilities planning in Japan. The casks are required to comply with the technical standards of regulations for both transport (hereinafter called ''transport regulation'') and storage (hereafter called ''storage regulation'') to maintain safety functions (heat transfer, containment, shielding and sub-critical control). In addition to these requirements, it is not planned in normal state to change the seal materials during storage at the storage facility, therefore it is requested to use same seal materials when the casks are transported after storage period. The dry transportable storage metal casks that satisfy the requirements have been developed to meet the needs of the dry storage facilities. The basic policy of this development is to utilize proven technology achieved from our design and fabrication experience, to carry out necessary verification for new designs and to realize a safe and rational design with higher capacity and efficient fabrication

  2. Methods Data Qualification Interim Report

    Alessi, R. Sam; Grimmett, Tami; Vang, Leng; McGrath, Dave

    2010-01-01

    The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models represent the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V and V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.

  3. Interim Hanford Waste Management Plan

    1985-09-01

    The September 1985 Interim Hanford Waste Management Plan (HWMP) is the third revision of this document. In the future, the HWMP will be updated on an annual basis or as major changes in disposal planning at Hanford Site require. The most significant changes in the program since the last release of this document in December 1984 include: (1) Based on studies done in support of the Hanford Defense Waste Environmental Impact Statement (HDW-EIS), the size of the protective barriers covering contaminated soil sites, solid waste burial sites, and single-shell tanks has been increased to provide a barrier that extends 30 m beyond the waste zone. (2) As a result of extensive laboratory development and plant testing, removal of transuranic (TRU) elements from PUREX cladding removal waste (CRW) has been initiated in PUREX. (3) The level of capital support in years beyond those for which specific budget projections have been prepared (i.e., fiscal year 1992 and later) has been increased to maintain Hanford Site capability to support potential future missions, such as the extension of N Reactor/PUREX operations. The costs for disposal of Hanford Site defense wastes are identified in four major areas in the HWMP: waste storage and surveillance, technology development, disposal operations, and capital expenditures

  4. Methods Data Qualification Interim Report

    R. Sam Alessi; Tami Grimmett; Leng Vang; Dave McGrath

    2010-09-01

    The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models represent the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V&V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.

  5. Dry interim storage of radioactive material in Germany

    Drobniewski, Christian; Palmes, Julia

    2013-01-01

    In accordance with the waste management concept in Germany, spent fuel is stored in interim storage facilities for a period of up to 40 years until deposition in a geological repository. In twelve on-site interim storages in the vicinity or directly on the sites of the nuclear power plants, spent fuel elements from reactor operation are stored after the necessary period of decay in wet storage basins inside the reactors. Additionally, three central interim storage facilities for storage of spent fuel of different origin are in operation. The German facilities realize the concept of dry interim storage in metallic transport and storage casks. The confinement of the radioactive material is ensured by the double lid system of the casks, of which the leak tightness is monitored constantly. The casks are constructed to provide adequate heat removal and shielding of gamma and neutron radiation. Usually the storage facilities are halls of thick concrete structures, which ensure the removal of the decay heat by natural convection. The main safety goal of the storage concept is to prevent unnecessary exposure of persons, material goods and environment to ionizing radiation. Moreover any exposure should be kept as low as reasonable achievable. To reach this goal the containment of the radioactive materials, the disposal of decay heat, the sub criticality and the shielding of ionizing radiation has to be demonstrated by the applicant and verified by the licensing authority. In particular accidents, incidents and disasters have to be considered in the facility and cask design. This includes mechanical impacts onto the cask, internal and external fire, and environmental effects like wind, rain, snowfall, flood, earthquakes and landslides. In addition civilizatoric influences like plane crashes and explosions have to be taken into account. In all mentioned cases the secure confinement of the radioactive materials has to be ensured. On-site storage facilities have to consider the

  6. EMCS Retrofit Analysis - Interim Report

    Diamond, R.C.; Salsbury, T.I.; Bell, G.C.; Huang, Y.J.; Sezgen, A.O.; Mazzucchi, R.; Romberger, J.

    1999-03-01

    This report presents the interim results of analyses carried out in the Phillip Burton Federal Building in San Francisco from 1996 to 1998. The building is the site of a major demonstration of the BACnet communication protocol. The energy management and control systems (EMCS) in the building were retrofitted with BACnet compatible controllers in order to integrate certain existing systems on one common network. In this respect, the project has been a success. Interoperability of control equipment from different manufacturers has been demonstrated in a real world environment. Besides demonstrating interoperability, the retrofits carried out in the building were also intended to enhance control strategies and capabilities, and to produce energy savings. This report presents analyses of the energy usage of HVAC systems in the building, control performance, and the reaction of the building operators. The report does not present an evaluation of the performance capabilities of the BACnet protocol. A monitoring system was installed in the building that parallels many of the EMCS sensors and data were archived over a three-year period. The authors defined pre-retrofit and post-retrofit periods and analyzed the corresponding data to establish the changes in building performance resulting from the retrofit activities. The authors also used whole-building energy simulation (DOE-2) as a tool for evaluating the effect of the retrofit changes. The results of the simulation were compared with the monitored data. Changes in operator behavior were assessed qualitatively with questionnaires. The report summarizes the findings of the analyses and makes several recommendations as to how to achieve better performance. They maintain that the full potential of the EMCS and associated systems is not being realized. The reasons for this are discussed along with possible ways of addressing this problem. They also describe a number of new technologies that could benefit systems of the type

  7. Poor predictive value of positive interim FDG-PET/CT in primary mediastinal large B-cell lymphoma

    Lazarovici, Julien; Petrovanu, Cynthia; Danu, Alina; Ferme, Christophe; Ribrag, Vincent; Ghez, David [Gustave Roussy, Villejuif (France). Dept. of Hematology; Paris Saclay Univ., Saint-Aubin (France); Terroir, Marie [Gustave Roussy, Villejuif (France). Dept. of Nuclear Medicine and Endocrine Oncology; Paris Saclay Univ., Saint-Aubin (France); Arfi-Rouche, Julia [Gustave Roussy, Villejuif (France). Dept. of Radiology; Paris Saclay Univ., Saint-Aubin (France); Michot, Jean-Marie [Gustave Roussy, Villejuif (France). Dept. of Drug Development (DITEP); Paris Saclay Univ., Saint-Aubin (France); Mussot, Sacha; Florea, Valentina [Marie Lannelongue Hospital, Le Plessis Robinson (France). Dept. of Thoracic Surgery; Ghigna, Maria-Rosa [Marie Lannelongue Hospital, Le Plessis Robinson (France). Dept. of Pathology; Dartigues, Peggy [Gustave Roussy, Villejuif (France). Dept. of Pathology; Paris Saclay Univ., Saint-Aubin (France)

    2017-11-15

    Though commonly used to assess response to therapy, the prognostic value of interim FDG-PET/CT in Primary Mediastinal Large B-cell Lymphoma (PMBCL) is unclear. We conducted a retrospective study on 36 consecutive patients treated at our institution for a PMBCL between 2006 and 2014. All patients with a positive interim FDG-PET/CT had undergone histological restaging consisting either in a surgical debulking of the residual lesion (15 patients) or a CT-guided core needle biopsy (two patients). All FDG-PET/CT were secondarily reviewed according to the more recent Deauville criteria. Interim FDG-PET/CT was considered positive in 17/36 patients using visual evaluation. Among these patients, 14 had a Deauville score of 4. Histological restaging was negative in all but one case, showing inflammation and/or fibrosis. After a median follow-up of 48.5 months, a total of five patients have relapsed, two patients in the positive FDG-PET/CT group, and three patients in the negative FDG-PET/CT group, respectively. These data indicate that a positive interim FDG-PET/CT does not reflect persistence of active disease in the vast majority of PMBCL cases. The relapse rate appears similar regardless of interim FDG-PET/CT results and interpretation criteria. This suggests that interim FDG-PET/CT has a poor positive predictive value, thus kt should be used with caution in PMBCL. (orig.)

  8. Design review report FFTF interim storage cask

    Scott, P.L.

    1995-01-01

    Final Design Review Report for the FFTF Interim Storage Cask. The Interim Storage Cask (ISC) will be used for long term above ground dry storage of FFTF irradiated fuel in Core Component Containers (CCC)s. The CCC has been designed and will house assemblies that have been sodium washed in the IEM Cell. The Solid Waste Cask (SWC) will transfer a full CCC from the IEM Cell to the RSB Cask Loading Station where the ISC will be located to receive it. Once the loaded ISC has been sealed at the RSB Cask Loading Station, it will be transferred by facility crane to the DSWC Transporter. After the ISC has been transferred to the Interim Storage Area (ISA), which is yet to be designed, a mobile crane will be used to place the ISC in its final storage location

  9. CMM Interim Check Design of Experiments (U)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-07-29

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length and include a weekly interim check to reduce risk. The CMM interim check makes use of Renishaw’s Machine Checking Gauge which is an off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. As verification on the interim check process a design of experiments investigation was proposed to test a couple of key factors (location and inspector). The results from the two-factor factorial experiment proved that location influenced results more than the inspector or interaction.

  10. Daddy Months

    Volker Meier; Helmut Rainer

    2014-01-01

    We consider a bargaining model in which husband and wife decide on the allocation of time and disposable income. Since her bargaining power would go down otherwise more strongly, the wife agrees to having a child only if the husband also leaves the labor market for a while. The daddy months subsidy enables the couple to overcome a hold-up problem and thereby improves efficiency. However, the same ruling harms cooperative couples and may also reduce welfare in an endogenous taxation framework.

  11. Interim Administrators in Higher Education: A National Study

    Huff, Marie Thielke; Neubrander, Judy

    2015-01-01

    The focus of this paper is on the roles and experiences of interim administrators in higher education. A survey was given to current and recent interim administrators in four-year public universities and colleges across the United States. The goals were to identify the advantages and disadvantages of using and serving as interims, and to solicit…

  12. An Approach for Evaluating the Technical Quality of Interim Assessments

    Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian

    2010-01-01

    Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…

  13. Lessons for outsourcing and interim management relationships.

    Macko, W; Kostyack, P T

    1999-01-01

    Few decisions can affect an organization more than the selection of an outsourcing or interim management partner. More and more health care organizations face such decisions in today's competitive market in order to face new business needs. Making these relationships successful can be important for health care organizations seeking competitive advantages or seeking immediately accessible management support. These relationships, however, require careful partner selection and development. Success in outsourcing and interim management relationships is contingent upon a thorough selection process, a strong contract that has clearly and explicitly detailed responsibilities and a culture-sensitive business rapport between the client and selected partner.

  14. 216-T-4 interim stabilization final report

    Smith, D.L.

    1996-01-01

    This report provides a general description of the activities performed for the interim stabilization of the 216-T-4-1 ditch, 216-T-4-2 ditch, and 216-T-4-2 pond. Interim stabilization was required to reduce the amount of surface-contaminated acres and to minimize the migration of radioactive contamination. Work associated with the 216-T4-1 ditch and 216-T-4-2 pond was performed by the Radiation Area Remedial Action (RARA) Project. Work associated with the 216-T-4-2 ditch was done concurrently but was funded by Westinghouse Hanford Company (WHC) Tank Waste Remediation Systems (TWRS)

  15. SNF Interim Storage Canister Corrosion and Surface Environment Investigations

    Bryan, Charles R.; Enos, David G.

    2015-01-01

    This progress report describes work being done at Sandia National Laboratories (SNL) to assess the localized corrosion performance of container/cask materials used in the interim storage of spent nuclear fuel (SNF). Of particular concern is stress corrosion cracking (SCC), by which a through-wall crack could potentially form in a canister outer wall over time intervals that are shorter than possible dry storage times. In order for SCC to occur, three criteria must be met. A corrosive environment must be present on the canister surface, the metal must susceptible to SCC, and sufficient tensile stress to support SCC must be present through the entire thickness of the canister wall. SNL is currently evaluating the potential for each of these criteria to be met.

  16. SNF Interim Storage Canister Corrosion and Surface Environment Investigations

    Bryan, Charles R. [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States); Enos, David G. [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States)

    2015-09-01

    This progress report describes work being done at Sandia National Laboratories (SNL) to assess the localized corrosion performance of container/cask materials used in the interim storage of spent nuclear fuel (SNF). Of particular concern is stress corrosion cracking (SCC), by which a through-wall crack could potentially form in a canister outer wall over time intervals that are shorter than possible dry storage times. In order for SCC to occur, three criteria must be met. A corrosive environment must be present on the canister surface, the metal must susceptible to SCC, and sufficient tensile stress to support SCC must be present through the entire thickness of the canister wall. SNL is currently evaluating the potential for each of these criteria to be met.

  17. Effectiveness of interim remedial actions at a radioactive waste facility

    Devgun, J.S.; Beskid, N.J.; Peterson, J.M.; Seay, W.M.; McNamee, E.

    1989-01-01

    Over the past eight years, several interim remedial actions have been taken at the Niagara Falls Storage Site (NFSS), primarily to reduce radon and gamma radiation exposures and to consolidate radioactive waste into a waste containment facility. Interim remedial actions have included capping of vents, sealing of pipes, relocation of the perimeter fence (to limit radon risk), transfer and consolidation of waste, upgrading of storage buildings, construction of a clay cutoff wall (to limit the potential groundwater transport of contaminants), treatment and release of contaminated water, interim use of a synthetic liner, and emplacement of an interim clay cap. An interim waste containment facility was completed in 1986. 6 refs., 3 figs

  18. Interim storage of radioactive waste packages

    1998-01-01

    This report covers all the principal aspects of production and interim storage of radioactive waste packages. The latest design solutions of waste storage facilities and the operational experiences of developed countries are described and evaluated in order to assist developing Member States in decision making and design and construction of their own storage facilities. This report is applicable to any category of radioactive waste package prepared for interim storage, including conditioned spent fuel, high level waste and sealed radiation sources. This report addresses the following issues: safety principles and requirements for storage of waste packages; treatment and conditioning methods for the main categories of radioactive waste; examples of existing interim storage facilities for LILW, spent fuel and high level waste; operational experience of Member States in waste storage operations including control of storage conditions, surveillance of waste packages and observation of the behaviour of waste packages during storage; retrieval of waste packages from storage facilities; technical and administrative measures that will ensure optimal performance of waste packages subject to various periods of interim storage

  19. Disposal facility data for the interim performance

    Eiholzer, C.R.

    1995-01-01

    The purpose of this report is to identify and provide information on the waste package and disposal facility concepts to be used for the low-level waste tank interim performance assessment. Current concepts for the low-level waste form, canister, and the disposal facility will be used for the interim performance assessment. The concept for the waste form consists of vitrified glass cullet in a sulfur polymer cement matrix material. The waste form will be contained in a 2 x 2 x 8 meter carbon steel container. Two disposal facility concepts will be used for the interim performance assessment. These facility concepts are based on a preliminary disposal facility concept developed for estimating costs for a disposal options configuration study. These disposal concepts are based on vault type structures. None of the concepts given in this report have been approved by a Tank Waste Remediation Systems (TWRS) decision board. These concepts will only be used in th interim performance assessment. Future performance assessments will be based on approved designs

  20. 33 CFR 385.38 - Interim goals.

    2010-07-01

    ..., monitoring and assessment; (ii) Be provided to the independent scientific review panel established in.... The interim goals shall be developed through the use of appropriate models and tools and shall provide... to be required to meet long-term hydrological and ecological restoration goals, based on best...

  1. Interim Storage Facility decommissioning. Final report

    Johnson, R.P.; Speed, D.L.

    1985-01-01

    Decontamination and decommissioning of the Interim Storage Facility were completed. Activities included performing a detailed radiation survey of the facility, removing surface and imbedded contamination, excavating and removing the fuel storage cells, restoring the site to natural conditions, and shipping waste to Hanford, Washington, for burial. The project was accomplished on schedule and 30% under budget with no measurable exposure to decommissioning personnel

  2. 19 CFR 354.8 - Interim sanctions.

    2010-04-01

    ... reconsider imposition of interim sanctions on the basis of new and material evidence or other good cause... Secretary may petition a presiding official to impose such sanctions. (b) The presiding official may impose... person to return material previously provided by the Department and all other materials containing the...

  3. Automotive Mechanics Occupational Performance Survey. Interim Report.

    Borcher, Sidney D.; Leiter, Paul B.

    The purpose of this federally-funded interim report is to present the results of a task inventory analysis survey of automotive mechanics completed by project staff within the Instructional Systems Design Program at the Center for Vocational and Technical Education. Intended for use in curriculum development for vocational education programs in…

  4. A Non-Traditional Interim Project.

    Brown, Diane; Ward, Dorothy

    1980-01-01

    Describes a project initiated by the Foreign Language Department of Birmingham-Southern College for their Interim term and discusses an interdisciplinary course focusing on Medieval Europe. The course included presentations on German and French language and literature, as well as lectures on the arts, philosophy, and family life of the period.…

  5. 340 waste handling facility interim safety basis

    VAIL, T.S.

    1999-04-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people.

  6. ITER interim design report package documents

    1996-01-01

    This publication contains the Excerpt from the ITER Council (IC-8), the ITER Interim Design Report, Cost Review and Safety Analysis, ITER Site Requirements and ITER Site Design Assumptions and the Excerpt from the ITER Council (IC-9). 8 figs, 2 tabs

  7. LANDFILL BIOREACTOR PERFORMANCE, SECOND INTERIM REPORT

    A bioreactor landfill is a landfill that is operated in a manner that is expected to increase the rate and extent of waste decomposition, gas generation, and settlement compared to a traditional landfill. This Second Interim Report was prepared to provide an interpretation of fie...

  8. 340 waste handling facility interim safety basis

    VAIL, T.S.

    1999-01-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people

  9. Analisis Pengaruh Publikasi Laporan Keuangan Interim Terhadap Abnormal Return Saham Di Bursa Efek Indonesia (Bei)

    jatiningrum, citrawati

    2009-01-01

    Target of financial statement is provide the information which is concerning financial position of an worthwhile company to a large amount of user in economic decision. Interim financial statement represent the financial statement published among annual financial statement, able to be compiled in monthly, quarterly or other period is which less than one year including entire all financial statement component.This research is aim to prove empirically whether what there is influence which signi...

  10. Pathways to deep decarbonization - Interim 2014 Report

    2014-01-01

    The interim 2014 report by the Deep Decarbonization Pathways Project (DDPP), coordinated and published by IDDRI and the Sustainable Development Solutions Network (SDSN), presents preliminary findings of the pathways developed by the DDPP Country Research Teams with the objective of achieving emission reductions consistent with limiting global warming to less than 2 deg. C. The DDPP is a knowledge network comprising 15 Country Research Teams and several Partner Organizations who develop and share methods, assumptions, and findings related to deep decarbonization. Each DDPP Country Research Team has developed an illustrative road-map for the transition to a low-carbon economy, with the intent of taking into account national socio-economic conditions, development aspirations, infrastructure stocks, resource endowments, and other relevant factors. The interim 2014 report focuses on technically feasible pathways to deep decarbonization

  11. Developing new transportable storage casks for interim dry storage

    Hayashi, K.; Iwasa, K.; Araki, K.; Asano, R. [Hitachi Zosen Diesel and Engineering Co., Ltd., Tokyo (Japan)

    2004-07-01

    Transportable storage metal casks are to be consistently used during transport and storage for AFR interim dry storage facilities planning in Japan. The casks are required to comply with the technical standards of regulations for both transport (hereinafter called ''transport regulation'') and storage (hereafter called ''storage regulation'') to maintain safety functions (heat transfer, containment, shielding and sub-critical control). In addition to these requirements, it is not planned in normal state to change the seal materials during storage at the storage facility, therefore it is requested to use same seal materials when the casks are transported after storage period. The dry transportable storage metal casks that satisfy the requirements have been developed to meet the needs of the dry storage facilities. The basic policy of this development is to utilize proven technology achieved from our design and fabrication experience, to carry out necessary verification for new designs and to realize a safe and rational design with higher capacity and efficient fabrication.

  12. Gaz de France interim financial report 2007

    2007-01-01

    This financial report contains the unaudited condensed financial statements of Gaz de France Group for the first half ended June 30, 2007, which were reviewed by the audit committee on August 27, 2007 and by the board of directors at its meeting on August 28, 2007. It includes forward-looking statements concerning the objectives, strategies, financial position, future operating results and the operations of Gaz de France Group. These statements reflect the Group's current perception of its activities and the markets in which it operates, as well as various estimates and assumptions considered to be reasonable. Content: interim management report (highlights of the first half of 2007, revenues and results for the period, financial structure, data on outstanding stock, outlook); interim consolidated financial statements (consolidated statements of income, consolidated balance sheets, consolidated statements of cash flows, recognized income and expenses, statements of changes in shareholders' equity, note to the consolidated financial statements); statement by the person responsible for the interim financial report; statutory auditors' report. (J.S.)

  13. Tribal child welfare. Interim final rule.

    2012-01-06

    The Administration for Children and Families (ACF) is issuing this interim final rule to implement statutory provisions related to the Tribal title IV-E program. Effective October 1, 2009, section 479B(b) of the Social Security Act (the Act) authorizes direct Federal funding of Indian Tribes, Tribal organizations, and Tribal consortia that choose to operate a foster care, adoption assistance and, at Tribal option, a kinship guardianship assistance program under title IV-E of the Act. The Fostering Connections to Success and Increasing Adoptions Act of 2008 requires that ACF issue interim final regulations which address procedures to ensure that a transfer of responsibility for the placement and care of a child under a State title IV-E plan to a Tribal title IV-E plan occurs in a manner that does not affect the child's eligibility for title IV-E benefits or medical assistance under title XIX of the Act (Medicaid) and such services or payments; in-kind expenditures from third-party sources for the Tribal share of administration and training expenditures under title IV-E; and other provisions to carry out the Tribal-related amendments to title IV-E. This interim final rule includes these provisions and technical amendments necessary to implement a Tribal title IV-E program.

  14. Current status of the first interim spent fuel storage facility in Japan

    Shinbo, Hitoshi; Kondo, Mitsuru

    2008-01-01

    In Japan, storage of spent fuels outside nuclear power plants was enabled as a result of partial amendments to the Nuclear Reactor Regulation Law in June 2000. Five months later, Mutsu City in Aomori Prefecture asked the Tokyo Electric Power Company (TEPCO) to conduct technical surveys on siting of the interim spent fuel storage facility (we call it 'Recyclable-Fuel Storage Center'). In April 2003, TEPCO submitted the report on siting feasibility examination, concluded that no improper engineering data for siting, construction of the facility will be possible from engineering viewpoint. Siting Activities for publicity and public acceptance have been continued since then. After these activities, Aomori Prefecture and Mutsu City approved siting of the Recyclable Fuel Storage Center in October 2005. Aomori Prefecture, Mutsu City, TEPCO and Japan Atomic Power Company (JAPC) signed an agreement on the interim spent fuel storage Facility. A month later, TEPCO and JAPC established Recyclable-Fuel Storage Company (RFS) in Mutsu City through joint capital investment, specialized in the first interim spent fuel storage Facility in Japan. In May 2007, we made an application for establishment permit, following safety review by regulatory authorities. In March 2008, we started the preparatory construction. RFS will safely store of spent fuels of TEPCO and JAPC until they will be reprocessed. Final storage capacity will be 5,000 ton-U. First we will construct the storage building of 3,000 ton-U to be followed by second building. We aim to start operation by 2010. (author)

  15. Compilation of interim technical research memoranda. Volume I

    Shanahan, W.R.

    1984-04-01

    Four interim technical research memoranda are presented that describe the results of numerical simulations designed to investigate the dynamics of energetic plasma beams propagating across magnetic fields

  16. Financial compensation for municipalities hosting interim or final disposal facilities for radioactive waste

    Barboza, Alex; Vicente, Roberto

    2005-01-01

    Brazilian Law No. 10308 issued November 20, 2001, establishes in its 34th article that 'those municipalities hosting interim or final disposal facilities for radioactive waste are eligible to receive a monthly payment as compensation'. The values of due payments depend on parameters such as volume of wastes and activity and half-lives of the radionuclides. The method to calculating those values was established by the National Commission on Nuclear Energy, the Brazilian regulatory authority, by Resolution No. 10, issued in the August 18, 2003. In this paper we report the application of that method to a low- and intermediate-level radioactive waste interim storage facility at the Nuclear Energy Research Institute. (author)

  17. The Homestake Interim Laboratory and Homestake DUSEL

    Lesko, Kevin T.

    2011-12-01

    The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for

  18. The Homestake Interim Laboratory and Homestake DUSEL

    Lesko, Kevin T.

    2011-01-01

    The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for

  19. 40 CFR 80.141 - Interim detergent gasoline program.

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Interim detergent gasoline program. 80... (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Detergent Gasoline § 80.141 Interim detergent gasoline... apply to: (i) All gasoline sold or transferred to a party who sells or transfers gasoline to the...

  20. 50 CFR 660.720 - Interim protection for sea turtles.

    2010-10-01

    ... 50 Wildlife and Fisheries 9 2010-10-01 2010-10-01 false Interim protection for sea turtles. 660.720 Section 660.720 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707...

  1. 12 CFR 541.18 - Interim Federal savings association.

    2010-01-01

    ... an existing savings and loan holding company or to facilitate any other transaction the Office may... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term...

  2. Transuranic waste storage and assay facility (TRUSAF) interim safety basis

    Gibson, K.D.

    1995-09-01

    The TRUSAF ISB is based upon current facility configuration and procedures. The purpose of the document is to provide the basis for interim operation or restrictions on interim operations and the authorization basis for the TRUSAF at the Hanford Site. The previous safety analysis document TRUSAF hazards Identification and Evaluation (WHC 1977) is superseded by this document

  3. Presidential Transition: The Experience of Two Community College Interim Presidents

    Thompson, Matthew D.

    2010-01-01

    The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…

  4. Decision on performing interim analysis for comparative clinical trials.

    Pak, Kyongsun; Jacobus, Susanna; Uno, Hajime

    2017-09-01

    In randomized-controlled trials, interim analyses are often planned for possible early trial termination to claim superiority or futility of a new therapy. While unblinding is necessary to conduct the formal interim analysis in blinded studies, blinded data also have information about the potential treatment difference between the groups. We developed a blinded data monitoring tool that enables investigators to predict whether they observe such an unblinded interim analysis results that supports early termination of the trial. Investigators may skip some of the planned interim analyses if an early termination is unlikely. We specifically focused on blinded, randomized-controlled studies to compare binary endpoints of a new treatment with a control. Assuming one interim analysis is planned for early termination for superiority or futility, we conducted extensive simulation studies to assess the impact of the implementation of our tool on the size, power, expected number of interim analyses, and bias in the treatment effect. The numerical study showed the proposed monitoring tool does not affect size or power, but dramatically reduces the expected number of interim analyses when the effect of the treatment difference is small. The tool serves as a useful reference when interpreting the summary of the blinded data throughout the course of the trial, without losing integrity of the study. This tool could potentially save the study resources and budget by avoiding unnecessary interim analyses.

  5. General certification procedure of enterprises and interim job enterprises

    Int. At. Energy Agency, Wien

    2002-01-01

    This procedure defines the certification global process of enterprises employing workers of A or B category for nuclear facilities and interim job enterprises proposing workers of A or B category for nuclear facilities. This certification proves the enterprises ability to satisfy the specification ''E'' of the CEFRI and the interim job enterprises to satisfy the specification ''I'' of the CEFRI. (A.L.B.)

  6. 47 CFR 51.715 - Interim transport and termination pricing.

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim transport and termination pricing. 51.715 Section 51.715 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER... Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...

  7. Do Interim Assessments Reduce the Race and SES Achievement Gaps?

    Konstantopoulos, Spyros; Li, Wei; Miller, Shazia R.; van der Ploeg, Arie

    2017-01-01

    The authors examined differential effects of interim assessments on minority and low socioeconomic status students' achievement in Grades K-6. They conducted a large-scale cluster randomized experiment in 2009-2010 to evaluate the impact of Indiana's policy initiative introducing interim assessments statewide. The authors used 2-level models to…

  8. 78 FR 49782 - Interim Staff Guidance on Changes During Construction

    2013-08-15

    ... Construction AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim staff guidance; request for comment... During Construction.'' This ISG provides guidance to the NRC staff on the Preliminary Amendment Request...-ISG-025 ``Interim Staff Guidance on Changes during Construction under 10 CFR Part 52'' is available...

  9. Central waste complex interim safety basis

    Cain, F.G.

    1995-01-01

    This interim safety basis provides the necessary information to conclude that hazards at the Central Waste Complex are controlled and that current and planned activities at the CWC can be conducted safely. CWC is a multi-facility complex within the Solid Waste Management Complex that receives and stores most of the solid wastes generated and received at the Hanford Site. The solid wastes that will be handled at CWC include both currently stored and newly generated low-level waste, low-level mixed waste, contact-handled transuranic, and contact-handled TRU mixed waste

  10. Interim supply in the electricity industry

    Strassburg, W

    1977-06-01

    The interim supply or the so-called 'condition without a contract' can occur within the framework of energy supply in the relationship between 1) public utility and tariff customer, 2) public utility and the special last-in-line consumer, 3) supplying and distributing public utility, 4) public utility and territorial administrative body. The present contribution deals with the cases named under (3) and (4). Cases (1) and (2) were dealt with in a previous article. Relevant contract clauses and laws and their effects on contracting partners are discussed.

  11. Interim supply in the electricity industry

    Strassburg, W

    1977-05-01

    The interim supply or the so-called 'condition without a contract' can occur within the framework of energy supply in the relationship between: 1) public utility and tariff customer, 2) public utility and the special last-in-line consumer, 3) supplying and distributing public utility, 4) public utility and territorial administrative body. The contribution at hand deals with the cases under 1) and 2); cases 3) and 4) are dealt with in an article to be published. Relevant contract clauses and laws and their effects on contracting partners are discussed. 41 references.

  12. Interim Reliability Evaluation Program procedures guide

    Carlson, D.D.; Gallup, D.R.; Kolaczkowski, A.M.; Kolb, G.J.; Stack, D.W.; Lofgren, E.; Horton, W.H.; Lobner, P.R.

    1983-01-01

    This document presents procedures for conducting analyses of a scope similar to those performed in Phase II of the Interim Reliability Evaluation Program (IREP). It documents the current state of the art in performing the plant systems analysis portion of a probabilistic risk assessment. Insights gained into managing such an analysis are discussed. Step-by-step procedures and methodological guidance constitute the major portion of the document. While not to be viewed as a cookbook, the procedures set forth the principal steps in performing an IREP analysis. Guidance for resolving the problems encountered in previous analyses is offered. Numerous examples and representative products from previous analyses clarify the discussion

  13. National NIF Diagnostic Program Interim Management Plan

    Warner, B

    2002-01-01

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  14. German Approach for the Transport of Spent Fuel Packages after Interim Storage

    Wille, Frank; Wolff, Dietmar; Droste, Bernhard; Voelzke, Holger

    2014-01-01

    In Germany the concept of dry interim storage of spent nuclear fuel in dual purpose metal casks is implemented, currently for periods of up to 40 years. The casks being used have an approved package design in accordance with the international transport regulations. The license for dry storage is granted on the German Atomic Energy Act with respect to the recently (in 2012) revised 'Guidelines for dry cask storage of spent nuclear fuel and heat-generating waste' by the German Waste management Commission (ESK) which are very similar to the former RSK (reactor safety commission) guidelines. For transport on public routes between or after long term interim storage periods, it has to be ensured that the transport and storage casks fulfil the specifications of the transport approval or other sufficient properties which satisfy the proofs for the compliance of the safety objectives at that time. In recent years the validation period of transport approval certificates for manufactured, loaded and stored packages were discussed among authorities and applicants. A case dependent system of 3, 5 and 10 years was established. There are consequences for the safety cases in the Package Design Safety Report including evaluation of long term behavior of components and specific operating procedures of the package. Present research and knowledge concerning the long term behavior of transport and storage cask components have to be consulted as well as experiences from interim cask storage operations. Challenges in the safety assessment are e.g. the behavior of aged metal and elastomeric seals under IAEA test conditions to ensure that the results of drop tests can be transferred to the compliance of the safety objectives at the time of transport after the interim storage period (aged package). Assessment methods for the material compatibility, the behavior of fuel assemblies and the aging behavior of shielding parts are issues as well. This paper describes the state

  15. First interim examination of defected BWR and PWR rods tested in unlimited air at 2290C

    Einziger, R.E.; Cook, J.A.

    1983-01-01

    A five-year whole rod test was initiated to investigate the long-term stability of spent fuel rods under a variety of possible dry storage conditions. Both PWR and BWR rods were included in the test. The first interim examination was conducted after three months of testing to determine if there was any degradation in those defected rods stored in an unlimited air atmosphere. Visual observations, diametral measurements and radiographic smears were used to assess the degree of cladding deformation and particulate dispersal. The PWR rod showed no measurable change from the pre-test condition. The two original artificial defects had not changed in appearance and there was no diametral growth of the cladding. One of the defects in BWR rod showed significant deformation. There was approximately 10% cladding strain at the defect site and a small axial crack had formed. The fuel in the defect did not appear to be friable. The second defect showed no visible change and no cladding strain. Following examination, the test was continued at 230 0 C. Another interim examination is planned during the summer of 1983. This paper discusses the details and meaning of the data from the first interim examination

  16. Conceptual design of interim storage facility for CNAI

    Fuenzalida Troyano, Carlos S.; Bergallo, Juan E.; Nassini, Horacio E.P.; Blanco, Anibal; Delmastro, Dario F.

    2007-01-01

    The reduced storage capacity available in the two spent fuel pools of argentine PHWR Atucha-1 power plant, the current plans for extending the reactor operation beyond its design lifetime, and the government decision on Atucha-2 NPP construction ending, have motivated the evaluation of a dry storage option for the interim management of spent fuel assemblies. Two different designs are presently being analyzed by an expert working group, from both technical and economical points of views. Authors are proposing a modular system consisting of an arrangement of reinforced concrete structures into which welded metallic canisters loaded with 37 spent fuel assemblies each stored in horizontal position. The reinforced concrete module is designed to provide the necessary physical protection and biological shielding to the loaded canisters during long-term storage, as well as passive means to remove the spent fuel decay heat by a combination of radiation, conduction and natural air convection. In this works are presented advances in the conceptual designs for a spent nuclear fuel system to Atucha I nuclear power plant. (author) [es

  17. Safety aspects of spent nuclear fuel interim storage installations

    Romanato, Luiz Sergio [Centro Tecnologico da Marinha em Sao Paulo (CTMSP), Sao Paulo, SP (Brazil). Dept. da Qualidade. Div. de Sistemas da Qualidade]. E-mail: romanato@ctmsp.mar.mil.br; Rzyski, Barbara Maria [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil). Div. de Ensino]. E-mail: bmrzyski@ipen.br

    2007-07-01

    Nowadays safety and security of spent nuclear fuel (SNF) interim storage installations are very important, due to a great concentration of fission products, actinides and activation products. In this kind of storage it is necessary to consider the physical security. Nuclear installations have become more vulnerable. New types of accidents must be considered in the design of these installations, which in the early days were not considered like: fissile material stolen, terrorists' acts and war conflicts, and traditional accidents concerning the transport of the spent fuel from the reactor to the storage location, earthquakes occurrence, airplanes crash, etc. Studies related to airplane falling had showed that a collision of big commercials airplanes at velocity of 800 km/h against SNF storage and specially designed concrete casks, do not result in serious structural injury to the casks, and not even radionuclides liberation to the environment. However, it was demonstrated that attacks with modern military ammunitions, against metallic casks, are calamitous. The casks could not support a direct impact of this ammo and the released radioactive materials can expose the workers and public as well the local environment to harmful radiation. This paper deals about the main basic aspects of a dry SNF storage installation, that must be physically well protected, getting barriers that difficult the access of unauthorized persons or vehicles, as well as, must structurally resist to incidents or accidents caused by unauthorized intrusion. (author)

  18. Model for low temperature oxidation during long term interim storage

    Desgranges, Clara; Bertrand, Nathalie; Gauvain, Danielle; Terlain, Anne [Service de la Corrosion et du Comportement des Materiaux dans leur Environnement, CEA/Saclay - 91191 Gif-sur-Yvette Cedex (France); Poquillon, Dominique; Monceau, Daniel [CIRIMAT UMR 5085, ENSIACET-INPT, 31077 Toulouse Cedex 4 (France)

    2004-07-01

    For high-level nuclear waste containers in long-term interim storage, dry oxidation will be the first and the main degradation mode during about one century. The metal lost by dry oxidation over such a long period must be evaluated with a good reliability. To achieve this goal, modelling of the oxide scale growth is necessary and this is the aim of the dry oxidation studies performed in the frame of the COCON program. An advanced model based on the description of elementary mechanisms involved in scale growth at low temperatures, like partial interfacial control of the oxidation kinetics and/or grain boundary diffusion, is developed in order to increase the reliability of the long term extrapolations deduced from basic models developed from short time experiments. Since only few experimental data on dry oxidation are available in the temperature range of interest, experiments have also been performed to evaluate the relevant input parameters for models like grain size of oxide scale, considering iron as simplified material. (authors)

  19. Model for low temperature oxidation during long term interim storage

    Desgranges, Clara; Bertrand, Nathalie; Gauvain, Danielle; Terlain, Anne; Poquillon, Dominique; Monceau, Daniel

    2004-01-01

    For high-level nuclear waste containers in long-term interim storage, dry oxidation will be the first and the main degradation mode during about one century. The metal lost by dry oxidation over such a long period must be evaluated with a good reliability. To achieve this goal, modelling of the oxide scale growth is necessary and this is the aim of the dry oxidation studies performed in the frame of the COCON program. An advanced model based on the description of elementary mechanisms involved in scale growth at low temperatures, like partial interfacial control of the oxidation kinetics and/or grain boundary diffusion, is developed in order to increase the reliability of the long term extrapolations deduced from basic models developed from short time experiments. Since only few experimental data on dry oxidation are available in the temperature range of interest, experiments have also been performed to evaluate the relevant input parameters for models like grain size of oxide scale, considering iron as simplified material. (authors)

  20. Safety aspects of spent nuclear fuel interim storage installations

    Romanato, Luiz Sergio

    2007-01-01

    Nowadays safety and security of spent nuclear fuel (SNF) interim storage installations are very important, due to a great concentration of fission products, actinides and activation products. In this kind of storage it is necessary to consider the physical security. Nuclear installations have become more vulnerable. New types of accidents must be considered in the design of these installations, which in the early days were not considered like: fissile material stolen, terrorists' acts and war conflicts, and traditional accidents concerning the transport of the spent fuel from the reactor to the storage location, earthquakes occurrence, airplanes crash, etc. Studies related to airplane falling had showed that a collision of big commercials airplanes at velocity of 800 km/h against SNF storage and specially designed concrete casks, do not result in serious structural injury to the casks, and not even radionuclides liberation to the environment. However, it was demonstrated that attacks with modern military ammunitions, against metallic casks, are calamitous. The casks could not support a direct impact of this ammo and the released radioactive materials can expose the workers and public as well the local environment to harmful radiation. This paper deals about the main basic aspects of a dry SNF storage installation, that must be physically well protected, getting barriers that difficult the access of unauthorized persons or vehicles, as well as, must structurally resist to incidents or accidents caused by unauthorized intrusion. (author)

  1. Interim storage packagings for spent fuels : how to optimize an universal design to local needs

    Konirsch, O.; Kawabata, T.; Hunter, I.

    2003-01-01

    For the last ten years, the interim storage market for spent fuels issued from Nuclear Power Plants has significantly increased all over the world: there are presently many storage projects either in Asia, in North America and in Europe. Even if there is no international regulation on that field, there is a big concern from all the nuclear industry to try to harmonise the specification for the definition of the Interim Storage Systems. One example of this harmonisation is the common and general wish to develop systems, which allow to be easily transportable either to a final repository or to a reprocessing plant. As this destination is generally not yet known, the storage system should be able to be transported all over the world. On the other hand, the specific requirement for the storage facility and its associated equipment are subject to local and/or national regulation. COGEMA LOGISTICS Group has developed two different technologies which are compatible with this principle of harmonisation: dual purpose metallic cask represented by the TN24 family and the concrete storage system NUHOMS(R). For both technologies, basic designs can be adapted to the local needs in term of performance and of national regulation. To cover all the world, COGEMA LOGISTICS Group has its own subsidiaries, in Asia, in North America and in Europe with their own autonomous engineers teams for designing, licensing, manufacturing and delivering the transport/storage products. COGEMA LOGISTICS Group is presently the leader on the dry interim storage market. The purpose of the present paper is to show how it is possible to optimise a basic existing design of a dual purpose metallic cask for a local need of storage. Taking into account the national rules for storage and the international regulation for transport, the designer shall minimise the development cost for a completely new design and maximise the capacity of the packaging regarding the allowable limits in the Nuclear Power Plant, in

  2. Sustainable Solutions for Nuclear used Fuels Interim Storage

    Arslan, Marc; Favet, Dominique; Issard, Herve; Le Jemtel, Amaury; Drevon, Caroline

    2014-01-01

    AREVA has a unique experience in providing sustainable solutions for used fuel management, fitted with the needs of different customers in the world and with regulation in different countries. These solutions entail both recycling and interim storage technologies. In a first part, we will describe the various types of solutions for Interim Storage of UNF that have been implemented around the world for interim storage at reactor or centralized Pad solution in canisters dry storage, vault type storages for dry storage, dry storage of transportation casks (dual purpose) pools for wet storage, The experience for all these different families of interim storages in which AREVA is involved is extensive and will be discussed with respect to the new challenges: increase of the duration of the interim storage (long term interim storage) increase of burn up of the fuels In a second part of the presentation, special recycling features will be presented. In that case, interim storage of the used fuels is ensured in pools. This provides in the long term good conditions for the behaviour of the fuel and its retrievability. With recycling, the final waste (Universal Canister of vitrified fission products and compacted hulls and end pieces): is stable and licensed in many countries for the final disposal (France, UK, Belgium, NL, Switzerland, Germany, Japan, upcoming: Spain, Australia, Italy). Presents neither safety criticality risks nor proliferation risks (AREVA conditioned HLW and LL-ILW are free of IAEA safeguard constraints thanks to AREVA process high recovery and purification yields). It can therefore be safely stored in interim storage for more than 100 years before final disposal. Some economic considerations will also be discussed. In particular, in the case of long term interim storage of used fuels, there are growing uncertainties regarding the future needs of repackaging and transportation, which can result in future cost overruns. Meanwhile, in the recycling policy

  3. Immunotherapy for recurrent malignant glioma: an interim report on survival.

    Ingram, M; Buckwalter, J G; Jacques, D B; Freshwater, D B; Abts, R M; Techy, G B; Miyagi, K; Shelden, C H; Rand, R W; English, L W

    1990-12-01

    We present interim survival data for a group of 83 adult patients with recurrent malignant glioma treated by implanting stimulated autologous lymphocytes into the tumour bed following surgical debulking. The patients were treated 6 months or more prior to data analysis. Fifty-nine patients were male and 24 female. The mean age for the entire group was 48.4 years and the mean Karnofsky rating (KR) was 67.2. Eight of the patients had grade II tumours, 33 had grade III tumours and 42 had grade IV tumours. Statistical analysis focuses on tumour grade, KR and patient age, factors that have been shown to affect survival in previous studies. Multifactorial analyses are employed to identify interrelationships among factors related to survival. Seven patients (8%) did not respond to immunotherapy, 76 (92%) had a good initial response. Twenty-five patients (30.1%) are living and 18 (22%) have shown no evidence of recurrence. Results are evaluated in the light of those obtained in trials of other experimental therapies for recurrent malignant gliomas. It is concluded that the present protocol offers a safe and comparatively effective treatment option.

  4. Stent coverage and neointimal proliferation in bare metal stents postdilated with a Paclitaxel-eluting balloon versus everolimus-eluting stents: prospective randomized study using optical coherence tomography at 6-month follow-up.

    Poerner, Tudor C; Otto, Sylvia; Gassdorf, Johannes; Nitsche, Kristina; Janiak, Florian; Scheller, Bruno; Goebel, Björn; Jung, Christian; Figulla, Hans R

    2014-12-01

    In this randomized trial, strut coverage and neointimal proliferation of a therapy of bare metal stents (BMSs) postdilated with the paclitaxel drug-eluting balloon (DEB) was compared with everolimus drug-eluting stents (DESs) at 6-month follow-up using optical coherence tomography. We hypothesized sufficient stent coverage at follow-up. A total of 105 lesions in 90 patients were treated with either XIENCE V DES (n=51) or BMS postdilated with the SeQuent Please DEB (n=54). At follow-up, comparable results on the primary optical coherence tomography end point (percentage uncovered struts 5.64±9.65% in BMS+DEB versus 4.93±9.29% in DES; P=0.366) were found. Thus, BMS+DEB achieved the prespecified noninferiority margin of 5% uncovered struts versus DES (difference between treatment means, 0.71%; one-sided upper 95% confidence interval, 4.14%; noninferiority P=0.04). Optical coherence tomography analysis showed significantly more global neointimal proliferation in the BMS+DEB group (15.7±7.8 versus 11.0±5.2 mm(3) proliferation volume/cm stent length; P=0.002). No significant focal in-stent stenosis analyzed with angiography (percentage diameter stenosis at follow-up, 22.8±11.9 versus 16.9±10.4; P=0.014) and optical coherence tomography (peak local area stenosis, 39.5±13.8% versus 36.8±15.6%; P=0.409) was found. Good stent strut coverage of >94% was found in both therapy groups. Despite greater suppression of global neointimal growth in DES, both DES and BMS+DEB effectively prevented clinically relevant focal restenosis at 6-month follow-up. http://www.clinicaltrials.gov. Unique identifier: NCT01056744. © 2014 American Heart Association, Inc.

  5. An interim reference model for the middle atmosphere water vapor distribution

    Russell, J. M., III

    1987-01-01

    Nimbus 7 LIMS data are used to determine monthly and seasonal zonal mean reference stratospheric profiles over selected latitude bands, and other ground and airborne microwave data are combined with the LIMS data to construct an interim reference profile from the tropopause to 80 km for the midlatitude region averaged over the winter and spring periods. The present profiles indicate the presence of a hygropause near 50 mb pressure in the tropics, a relatively constant mixing ratio distribution with a height of 4.7-5 ppmv in the midlatitude and high latitude stratosphere, and a decrease in the midlatitude mesosphere to 1 ppmv at about 80 km.

  6. PROJECT W-551 INTERIM PRETREATMENT SYSTEM PRECONCEPTUAL CANDIDATE TECHNOLOGY DESCRIPTIONS

    MAY TH

    2008-08-12

    The Office of River Protection (ORP) has authorized a study to recommend and select options for interim pretreatment of tank waste and support Waste Treatment Plant (WTP) low activity waste (LAW) operations prior to startup of all the WTP facilities. The Interim Pretreatment System (IPS) is to be a moderately sized system which separates entrained solids and 137Cs from tank waste for an interim time period while WTP high level waste vitrification and pretreatment facilities are completed. This study's objective is to prepare pre-conceptual technology descriptions that expand the technical detail for selected solid and cesium separation technologies. This revision includes information on additional feed tanks.

  7. Hierarchies of belief and interim rationalizability

    Jeffrey C. Ely

    2006-03-01

    Full Text Available In games with incomplete information, conventional hierarchies of belief are incomplete as descriptions of the players' information for the purposes of determining a player's behavior. We show by example that this is true for a variety of solution concepts. We then investigate what is essential about a player's information to identify behavior. We specialize to two player games and the solution concept of interim rationalizability. We construct the universal type space for rationalizability and characterize the types in terms of their beliefs. Infinite hierarchies of beliefs over conditional beliefs, which we call Delta-hierarchies, are what turn out to matter. We show that any two types in any two type spaces have the same rationalizable sets in all games if and only if they have the same Delta-hierarchies.

  8. Interim report and accounts 1993/94

    1993-01-01

    An interim set of accounts and reports is presented here for 1993/1994 for the health science company Amersham International. The company's research programs focus on developments in life science research, nuclear medicine and industrial quality and safety assurance, with particular expertise in the application of radioactivity to labelling and detection at the molecular level. This report which covers the half-year to 30 September 1993 shows promising financial results, with turnover, operating profits and earnings per share all having risen. All life science markets report growth although difficult trading conditions are being reported in Europe. Two products in the Healthcare business have achieved progress, a pain palliation agent for bone metastases has been launched in the United States, and European approval has been gained for a new technetium based heart imaging agent. Further growth is expected for the company. (UK)

  9. Safety regulations for radioisotopes, etc. (interim report)

    1980-01-01

    An (interim) report by an ad hoc expert committee to the Nuclear Safety Commission, on the safety regulations for radioisotopes, etc., was presented. For the utilization of radioisotopes, etc., there is the Law Concerning Prevention of Radiation Injury Due to Radioisotopes, etc. with the advances in this field and the improvement in international standards, the regulations by the law have been examined. After explaining the basic ideas of the regulations, the problems and countermeasures in the current regulations are described: legal system, rationalization in permission procedures and others, inspection on RI management, the system of the persons in charge of radiation handling, RI transport, low-level radioactive wastes, consumer goods, definitions of RIs, radiation and sealed sources, regulations by group partitioning, RI facilities, system of personnel exposure registration, entrusting of inspection, etc. to private firms, and reduction in the works for permission among governmental offices. (author)

  10. AGR-1 Data Qualification Interim Report

    Abbott, Machael

    2009-01-01

    Projects for the very-high-temperature reactor (VHTR) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR Program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the data streams associated with the first Advanced Gas Reactor (AGR-1) experiment, the processing of these data within NDMAS, and reports the interim FY09 qualification status of the AGR-1 data to date. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category, which is assigned by the data generator, and include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing, to confirm that the data are an accurate representation of the system or object being measured, and (3) documentation that the data were collected under an NQA-1 or equivalent QA program. The interim qualification status of the following four data streams is reported in this document: (1) fuel fabrication data, (2) fuel irradiation data, (3) fission product monitoring system (FPMS) data, and (4) Advanced Test Reactor (ATR) operating conditions data. A final report giving the NDMAS qualification status of all AGR-1 data (including cycle 145A) is planned for February 2010

  11. An interim reference model for the variability of the middle atmosphere water vapor distribution

    Remsberg, E. E.; Russell, J. M., III; Wu, C.-Y.

    1990-01-01

    A reference model for the middle atmosphere water vapor distribution for some latitudes and seasons was developed using two data sets. One is the seven months of Nimbus LIMS data obtained during November 1978 to May 1979 over the range 64 deg S - 84 deg N latitude and from about 100-mb to 1-mb altitude, and the other is represented by water vapor profiles from 0.2 mb to 0.01 mb in the mid-mesosphere, measured on ground at several fixed mid-latitude sites in the Northern Hemisphere, using microwave-emission techniques. This model provides an interim water vapor profile for the entire vertical range of the middle atmosphere, with accuracies of better than 25 percent. The daily variability of stratospheric water vapor profiles about the monthly mean is demonstrated, and information is provided on the longitudinal variability of LIMS water vapor profiles about the daily, weekly, and monthly zonal means.

  12. The cost and impact of the interim federal health program cuts on child refugees in Canada.

    Evans, Andrea; Caudarella, Alexander; Ratnapalan, Savithiri; Chan, Kevin

    2014-01-01

    On June 30, 2012, Interim Federal Health Program (IFHP) funding was cut for refugee claimant healthcare. The potential financial and healthcare impacts of these cuts on refugee claimants are unknown. We conducted a one-year retrospective chart review spanning 6 months before and after IFHP funding cuts at The Hospital for Sick Children, a tertiary care children's hospital in Toronto. We analyzed emergency room visits characteristics, admission rates, reasons for admission, and financial records including billing from Medavie Blue Cross. There were 173 refugee children visits to the emergency room in the six months before and 142 visits in the six months after funding cuts. The total amount billed to the IFHP program during the one-year of this study was $131,615. Prior to the IFHP cuts, 46% of the total emergency room bills were paid by IFHP compared to 7% after the cuts (pinstitution in the country increased.

  13. Strategic Review of Medical Training and Career Structure Interim Report

    Department of Health (Ireland)

    2013-01-01

    Click here to download Strategic Review of Medical Training and Career Structure Interim Report PDF 44kb Click here to download Strategic Review of Medical Training and Career Structure Terms of Reference PDF 59KB

  14. Fuel Supply Shutdown Facility Interim Operational Safety Requirements

    BENECKE, M.W.

    2000-01-01

    The Interim Operational Safety Requirements for the Fuel Supply Shutdown (FSS) Facility define acceptable conditions, safe boundaries, bases thereof, and management of administrative controls to ensure safe operation of the facility

  15. Fire Hazards Analysis for the 200 Area Interim Storage Area

    JOHNSON, D.M.

    2000-01-01

    This documents the Fire Hazards Analysis (FHA) for the 200 Area Interim Storage Area. The Interim Storage Cask, Rad-Vault, and NAC-1 Cask are analyzed for fire hazards and the 200 Area Interim Storage Area is assessed according to HNF-PRO-350 and the objectives of DOE Order 5480 7A. This FHA addresses the potential fire hazards associated with the Interim Storage Area (ISA) facility in accordance with the requirements of DOE Order 5480 7A. It is intended to assess the risk from fire to ensure there are no undue fire hazards to site personnel and the public and to ensure property damage potential from fire is within acceptable limits. This FHA will be in the form of a graded approach commensurate with the complexity of the structure or area and the associated fire hazards

  16. Tank Farm Interim Surface Barrier Materials And Runoff Alternatives Study

    Holm, M.J.

    2009-01-01

    This report identifies candidate materials and concepts for interim surface barriers in the single-shell tank farms. An analysis of these materials for application to the TY tank farm is also provided.

  17. Interim research assessment 2003-2005 - Computer Science

    Mouthaan, A.J.; Hartel, Pieter H.

    This report primarily serves as a source of information for the 2007 Interim Research Assessment Committee for Computer Science at the three technical universities in the Netherlands. The report also provides information for others interested in our research activities.

  18. Interim Feed The Future Population Based Assessment of Cambodia

    US Agency for International Development — This is the interim population based survey of Feed the Future in Cambodia for 2015. The data is split into survey modules. Modules A through C includes location...

  19. EPA's Revised Interim Financial Assistance Conflict of Interest Policy

    EPA has established the following revised interim policy governing disclosure of actual and potential conflicts of interest (COI Policy) by applicants for, and recipients of, federal financial assistance awards from EPA.

  20. Interim report on long range plan for nuclear physics

    Anon.

    1995-01-01

    The interim report on the updated NSAC Long Range Plan for Nuclear Physics will be presented to the community for discussion and comment before submission to the funding agencies. The presentation will be coordinated by E. Moniz chair of NSAC

  1. TWRS HLW interim storage facility search and evaluation

    Calmus, R.B., Westinghouse Hanford

    1996-05-16

    The purpose of this study was to identify and provide an evaluation of interim storage facilities and potential facility locations for the vitrified high-level waste (HLW) from the Phase I demonstration plant and Phase II production plant. In addition, interim storage facilities for solidified separated radionuclides (Cesium and Technetium) generated during pretreatment of Phase I Low-Level Waste Vitrification Plant feed was evaluated.

  2. K basins interim remedial action health and safety plan

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  3. Interim Report by Asia International Grid Connection Study Group

    Omatsu, Ryo

    2018-01-01

    The Asia International Grid Connection Study Group Interim Report examines the feasibility of developing an international grid connection in Japan. The Group has investigated different cases of grid connections in Europe and conducted research on electricity markets in Northeast Asia, and identifies the barriers and challenges for developing an international grid network including Japan. This presentation introduces basic contents of the interim report by the Study Group.

  4. ITER interim design report package and relevant documents

    1996-01-01

    This publication documents the technical basis which underlay the Interim Design Report, Cost Review and Safety Analysis submitted to the ITER Councils (IC-8 and IC-9) Records of decisions and the ''ITER Interim Design Report Package''. This publication contains ITER Site Requirements and ITER Site Design Assumptions, TAC-8 Report, SRG Report, CP's Report on Tentative Sequence of Events and Parties' Views on the IDR Package and Parties' Technical Comments on the IDR Package. Figs, tabs

  5. Materials behavior in interim storage of spent fuel

    Johnson, A.B. Jr.; Bailey, W.J.; Gilbert, E.R.; Inman, S.C.

    1982-01-01

    Interim storage has emerged as the only current spent-fuel management method in the US and is essential in all countries with nuclear reactors. Materials behavior is a key aspect in licensing interim-storage facilities for several decades of spent-fuel storage. This paper reviews materials behavior in wet storage, which is licensed for light-water reactor (LWR) fuel, and dry storage, for which a licensing position for LWR fuel is developing

  6. Interim Safety Basis for Fuel Supply Shutdown Facility

    BENECKE, M.W.

    2000-01-01

    This ISB, in conjunction with the IOSR, provides the required basis for interim operation or restrictions on interim operations and administrative controls for the facility until a SAR is prepared in accordance with the new requirements or the facility is shut down. It is concluded that the risks associated with tha current and anticipated mode of the facility, uranium disposition, clean up, and transition activities required for permanent closure, are within risk guidelines

  7. Evaluation of ERA-Interim precipitation data in complex terrain

    Gao, Lu; Bernhardt, Matthias; Schulz, Karsten

    2013-04-01

    Precipitation controls a large variety of environmental processes, which is an essential input parameter for land surface models e.g. in hydrology, ecology and climatology. However, rain gauge networks provides the necessary information, are commonly sparse in complex terrains, especially in high mountainous regions. Reanalysis products (e.g. ERA-40 and NCEP-NCAR) as surrogate data are increasing applied in the past years. Although they are improving forward, previous studies showed that these products should be objectively evaluated due to their various uncertainties. In this study, we evaluated the precipitation data from ERA-Interim, which is a latest reanalysis product developed by ECMWF. ERA-Interim daily total precipitation are compared with high resolution gridded observation dataset (E-OBS) at 0.25°×0.25° grids for the period 1979-2010 over central Alps (45.5-48°N, 6.25-11.5°E). Wet or dry day is defined using different threshold values (0.5mm, 1mm, 5mm, 10mm and 20mm). The correspondence ratio (CR) is applied for frequency comparison, which is the ratio of days when precipitation occurs in both ERA-Interim and E-OBS dataset. The result shows that ERA-Interim captures precipitation occurrence very well with a range of CR from 0.80 to 0.97 for 0.5mm to 20mm thresholds. However, the bias of intensity increases with rising thresholds. Mean absolute error (MAE) varies between 4.5 mm day-1 and 9.5 mm day-1 in wet days for whole area. In term of mean annual cycle, ERA-Interim almost has the same standard deviation of the interannual variability of daily precipitation with E-OBS, 1.0 mm day-1. Significant wet biases happened in ERA-Interim throughout warm season (May to August) and dry biases in cold season (November to February). The spatial distribution of mean annual daily precipitation shows that ERA-Interim significant underestimates precipitation intensity in high mountains and northern flank of Alpine chain from November to March while pronounced

  8. 340 Waste Handling Facility interim safety basis

    Bendixsen, R.B.

    1995-01-01

    This document establishes the interim safety basis (ISB) for the 340 Waste Handling Facility (340 Facility). An ISB is a documented safety basis that provides a justification for the continued operation of the facility until an upgraded final safety analysis report is prepared that complies with US Department of Energy (DOE) Order 5480.23, Nuclear Safety Analysis Reports. The ISB for the 340 Facility documents the current design and operation of the facility. The 340 Facility ISB (ISB-003) is based on a facility walkdown and review of the design and operation of the facility, as described in the existing safety documentation. The safety documents reviewed, to develop ISB-003, include the following: OSD-SW-153-0001, Operating Specification Document for the 340 Waste Handling Facility (WHC 1990); OSR-SW-152-00003, Operating Limits for the 340 Waste Handling Facility (WHC 1989); SD-RE-SAP-013, Safety Analysis Report for Packaging, Railroad Liquid Waste Tank Cars (Mercado 1993); SD-WM-TM-001, Safety Assessment Document for the 340 Waste Handling Facility (Berneski 1994a); SD-WM-SEL-016, 340 Facility Safety Equipment List (Berneski 1992); and 340 Complex Fire Hazard Analysis, Draft (Hughes Assoc. Inc. 1994)

  9. Interim Basis for PCB Sampling and Analyses

    BANNING, D.L.

    2001-01-01

    This document was developed as an interim basis for sampling and analysis of polychlorinated biphenyls (PCBs) and will be used until a formal data quality objective (DQO) document is prepared and approved. On August 31, 2000, the Framework Agreement for Management of Polychlorinated Biphenyls (PCBs) in Hanford Tank Waste was signed by the US. Department of Energy (DOE), the Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) (Ecology et al. 2000). This agreement outlines the management of double shell tank (DST) waste as Toxic Substance Control Act (TSCA) PCB remediation waste based on a risk-based disposal approval option per Title 40 of the Code of Federal Regulations 761.61 (c). The agreement calls for ''Quantification of PCBs in DSTs, single shell tanks (SSTs), and incoming waste to ensure that the vitrification plant and other ancillary facilities PCB waste acceptance limits and the requirements of the anticipated risk-based disposal approval are met.'' Waste samples will be analyzed for PCBs to satisfy this requirement. This document describes the DQO process undertaken to assure appropriate data will be collected to support management of PCBs and is presented in a DQO format. The DQO process was implemented in accordance with the U.S. Environmental Protection Agency EPA QAlG4, Guidance for the Data Quality Objectives Process (EPA 1994) and the Data Quality Objectives for Sampling and Analyses, HNF-IP-0842/Rev.1 A, Vol. IV, Section 4.16 (Banning 1999)

  10. The EMEFS model evaluation. An interim report

    Barchet, W.R. [Pacific Northwest Lab., Richland, WA (United States); Dennis, R.L. [Environmental Protection Agency, Research Triangle Park, NC (United States); Seilkop, S.K. [Analytical Sciences, Inc., Durham, NC (United States); Banic, C.M.; Davies, D.; Hoff, R.M.; Macdonald, A.M.; Mickle, R.E.; Padro, J.; Puckett, K. [Atmospheric Environment Service, Downsview, ON (Canada); Byun, D.; McHenry, J.N. [Computer Sciences Corp., Research Triangle Park, NC (United States); Karamchandani, P.; Venkatram, A. [ENSR Consulting and Engineering, Camarillo, CA (United States); Fung, C.; Misra, P.K. [Ontario Ministry of the Environment, Toronto, ON (Canada); Hansen, D.A. [Electric Power Research Inst., Palo Alto, CA (United States); Chang, J.S. [State Univ. of New York, Albany, NY (United States). Atmospheric Sciences Research Center

    1991-12-01

    The binational Eulerian Model Evaluation Field Study (EMEFS) consisted of several coordinated data gathering and model evaluation activities. In the EMEFS, data were collected by five air and precipitation monitoring networks between June 1988 and June 1990. Model evaluation is continuing. This interim report summarizes the progress made in the evaluation of the Regional Acid Deposition Model (RADM) and the Acid Deposition and Oxidant Model (ADOM) through the December 1990 completion of a State of Science and Technology report on model evaluation for the National Acid Precipitation Assessment Program (NAPAP). Because various assessment applications of RADM had to be evaluated for NAPAP, the report emphasizes the RADM component of the evaluation. A protocol for the evaluation was developed by the model evaluation team and defined the observed and predicted values to be used and the methods by which the observed and predicted values were to be compared. Scatter plots and time series of predicted and observed values were used to present the comparisons graphically. Difference statistics and correlations were used to quantify model performance. 64 refs., 34 figs., 6 tabs.

  11. Industrial complementarities between interim storage and reversible geological repository - 59237

    Hoorelbeke, Jean-Michel

    2012-01-01

    The French Act voted in 2006 made the choice of deep geological disposal as the reference option for the long term management of high level (HLW) and intermediate level long-lived waste. The CIGEO repository project aims at avoiding or limiting burden to future generations, which could not be achieved by the extension in time of interim storage. The reversibility as provided by the Act will maintain a liberty of choice for waste management on a duration which is comparable to new storage facility. Interim storage is required to accommodate waste as long as the repository is not available. The commissioning of the repository in 2025 will not suppress needs for interim storage. The paper describes the complementarities between existing and future interim storage facilities and the repository project: repository operational issues and planning, HLW thermal decay, support for the reversibility, etc. It shows opportunities to prepare a global optimization of waste management including the utilization at best of storage capacities and the planning of waste emplacement in the repository in such a way to facilitate operational conditions and to limit cost. Preliminary simulations of storage-disposal scenarios are presented. Thanks to an optimal use of the waste management system, provision can be made for a progressive increase of waste emplacement flow during the first operation phase of the repository. It is then possible to stabilize the industrial activity level of the repository site. An optimal utilization of interim storage can also limit the diversity of waste packages emplaced simultaneously, which facilitates the operation of the repository. 60 years minimum interim storage duration is generally required with respect to HLW thermal output. Extending this interim storage period may reduce the underground footprint of the repository. Regarding reversibility, the capability to manage waste packages potentially retrieved from the repository should be analyzed. The

  12. Permitting plan for the high-level waste interim storage

    Deffenbaugh, M.L.

    1997-01-01

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist

  13. High Temperature Materials Interim Data Qualification Report

    Lybeck, Nancy

    2010-01-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are qualified for use, stored in a readily accessible electronic form, and analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the High Temperature Materials characterization data stream, the processing of these data within NDMAS, and reports the interim FY2010 qualification status of the data. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category assigned by the data generator. The High Temperature Materials data are being collected under NQA-1 guidelines, and will be qualified data. For NQA-1 qualified data, the qualification activities include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing to confirm that the data are an accurate representation of the system or object being measured, and (3) documenting that the data were collected under an NQA-1 or equivalent Quality Assurance program. Currently, data from two test series within the High Temperature Materials data stream have been entered into the NDMAS vault: (1) Tensile Tests for Sm (i.e., Allowable Stress) Confirmatory Testing - 1,403,994 records have been inserted into the NDMAS database. Capture testing is in process. (2) Creep-Fatigue Testing to Support Determination of Creep-Fatigue Interaction Diagram - 918,854 records have been processed and inserted into the NDMAS database. Capture testing is in process.

  14. Next Generation Melter Optioneering Study - Interim Report

    Gray, M.F.; Calmus, R.B.; Ramsey, G.; Lomax, J.; Allen, H.

    2010-01-01

    The next generation melter (NOM) development program includes a down selection process to aid in determining the recommended vitrification technology to implement into the WTP at the first melter change-out which is scheduled for 2025. This optioneering study presents a structured value engineering process to establish and assess evaluation criteria that will be incorporated into the down selection process. This process establishes an evaluation framework that will be used progressively throughout the NGM program, and as such this interim report will be updated on a regular basis. The workshop objectives were achieved. In particular: (1) Consensus was reached with stakeholders and technology providers represented at the workshop regarding the need for a decision making process and the application of the D 2 0 process to NGM option evaluation. (2) A framework was established for applying the decision making process to technology development and evaluation between 2010 and 2013. (3) The criteria for the initial evaluation in 2011 were refined and agreed with stakeholders and technology providers. (4) The technology providers have the guidance required to produce data/information to support the next phase of the evaluation process. In some cases it may be necessary to reflect the data/information requirements and overall approach to the evaluation of technology options against specific criteria within updated Statements of Work for 2010-2011. Access to the WTP engineering data has been identified as being very important for option development and evaluation due to the interface issues for the NGM and surrounding plant. WRPS efforts are ongoing to establish precisely data that is required and how to resolve this Issue. It is intended to apply a similarly structured decision making process to the development and evaluation of LAW NGM options.

  15. Interim process report for the safety assessment SR-Can

    Sellin, Patrick

    2004-08-01

    This report is a documentation of buffer processes identified as relevant to the long-term safety of a KBS-3 repository. The report is part of the interim reporting of the safety assessment SR-Can, see further the Interim main report. The final SR-Can reporting will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of this report is to document the scientific knowledge of the processes to a level required for an adequate treatment in the safety assessment. The documentation is thus from a scientific point of not exhaustive since such a treatment is neither necessary for the purposes of the safety assessment nor possible within the scope of an assessment. The purpose is further to determine the handling of each process in the safety assessment and to demonstrate how uncertainties are taken care of, given the suggested handling. The process documentation in the SR 97 version of the Process report is a starting point for this SR-Can interim version. As further described in the Interim main report, the list of relevant processes has been reviewed and slightly extended by comparison to other databases. Furthermore, the backfill has been included as a system part of its own, rather than being described together with the buffer as in SR 97. Apart from giving an interim account of the documentation and handling of buffer processes in SR-Can, this report is meant to serve as a template for the forthcoming documentation of processes occurring in other parts of the repository system. A complete list of processes can be found in the Interim FEP report for the safety assessment SR-Can. All material presented in this document is preliminary in nature and will possibly be updated as the SR-Can project progresses

  16. Single-shell tank interim stabilization project plan

    Ross, W.E.

    1998-03-27

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE`s Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  17. Single-shell tank interim stabilization project plan

    Ross, W.E.

    1998-01-01

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE's Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  18. Interim process report for the safety assessment SR-Can

    Sellin, Patrick (ed.)

    2004-08-01

    This report is a documentation of buffer processes identified as relevant to the long-term safety of a KBS-3 repository. The report is part of the interim reporting of the safety assessment SR-Can, see further the Interim main report. The final SR-Can reporting will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of this report is to document the scientific knowledge of the processes to a level required for an adequate treatment in the safety assessment. The documentation is thus from a scientific point of not exhaustive since such a treatment is neither necessary for the purposes of the safety assessment nor possible within the scope of an assessment. The purpose is further to determine the handling of each process in the safety assessment and to demonstrate how uncertainties are taken care of, given the suggested handling. The process documentation in the SR 97 version of the Process report is a starting point for this SR-Can interim version. As further described in the Interim main report, the list of relevant processes has been reviewed and slightly extended by comparison to other databases. Furthermore, the backfill has been included as a system part of its own, rather than being described together with the buffer as in SR 97. Apart from giving an interim account of the documentation and handling of buffer processes in SR-Can, this report is meant to serve as a template for the forthcoming documentation of processes occurring in other parts of the repository system. A complete list of processes can be found in the Interim FEP report for the safety assessment SR-Can. All material presented in this document is preliminary in nature and will possibly be updated as the SR-Can project progresses.

  19. 10 CFR 431.401 - Petitions for waiver, and applications for interim waiver, of test procedure.

    2010-01-01

    ... Renewable Energy, U.S. Department of Energy. Each Application for Interim Waiver must reference the Petition... Renewable Energy. (e) Provisions specific to interim waivers—(1) Disposition of application. If... 10 Energy 3 2010-01-01 2010-01-01 false Petitions for waiver, and applications for interim waiver...

  20. 78 FR 67442 - Congestion Mitigation and Air Quality Improvement Program Interim Guidance

    2013-11-12

    ...] Congestion Mitigation and Air Quality Improvement Program Interim Guidance AGENCY: Federal Highway... Comment. SUMMARY: The FHWA is issuing Interim Guidance on the Congestion Mitigation and Air Quality.../environment/air_quality/cmaq/policy_and_guidance/2008_guidance/ guidance/. DATES: This Interim Guidance is...

  1. A web-based endpoint adjudication system for interim analyses in clinical trials.

    Nolen, Tracy L; Dimmick, Bill F; Ostrosky-Zeichner, Luis; Kendrick, Amy S; Sable, Carole; Ngai, Angela; Wallace, Dennis

    2009-02-01

    A data monitoring committee (DMC) is often employed to assess trial progress and review safety data and efficacy endpoints throughout a trail. Interim analyses performed for the DMC should use data that are as complete and verified as possible. Such analyses are complicated when data verification involves subjective study endpoints or requires clinical expertise to determine each subject's status with respect to the study endpoint. Therefore, procedures are needed to obtain adjudicated data for interim analyses in an efficient manner. In the past, methods for handling such data included using locally reported results as surrogate endpoints, adjusting analysis methods for unadjudicated data, or simply performing the adjudication as rapidly as possible. These methods all have inadequacies that make their sole usage suboptimal. For a study of prophylaxis for invasive candidiasis, adjudication of both study eligibility criteria and clinical endpoints prior to two interim analyses was required. Because the study was expected to enroll at a moderate rate and the sponsor required adjudicated endpoints to be used for interim analyses, an efficient process for adjudication was required. We created a web-based endpoint adjudication system (WebEAS) that allows for expedited review by the endpoint adjudication committee (EAC). This system automatically identifies when a subject's data are complete, creates a subject profile from the study data, and assigns EAC reviewers. The reviewers use the WebEAS to review the subject profile and submit their completed review form. The WebEAS then compares the reviews, assigns an additional review as a tiebreaker if needed, and stores the adjudicated data. The study for which this system was originally built was administratively closed after 10 months with only 38 subjects enrolled. The adjudication process was finalized and the WebEAS system activated prior to study closure. Some website accessibility issues presented initially. However

  2. An interim report on the State of Nevada socioeconomic studies

    1989-06-01

    This Interim Report is a report on work in progress and presents findings from the research to date on the potential consequences of a repository for the citizens of Nevada. The research and findings in the Report have been subjected to rigorous peer review as part of the state's effort to insure independent, objective analysis that meets the highest professional standards. The basic research effort will continue through June 1990 and will enable the state to refine and clarify the findings presented in this Interim Report

  3. Single-shell tank interim stabilization risk analysis

    Basche, A.D.

    1998-01-01

    The purpose of the Single-Shell Tank (SST) Interim Stabilization Risk Analysis is to provide a cost and schedule risk analysis of HNF-2358, Rev. 1, Single-Shell Tank Interim Stabilization Project Plan (Project Plan) (Ross et al. 1998). The analysis compares the required cost profile by fiscal year (Section 4.2) and revised schedule completion date (Section 4.5) to the Project Plan. The analysis also evaluates the executability of the Project Plan and recommends a path forward for risk mitigation

  4. Interim safety basis for fuel supply shutdown facility

    Brehm, J.R.; Deobald, T.L.; Benecke, M.W.; Remaize, J.A.

    1995-01-01

    This ISB in conjunction with the new TSRs, will provide the required basis for interim operation or restrictions on interim operations and administrative controls for the Facility until a SAR is prepared in accordance with the new requirements. It is concluded that the risk associated with the current operational mode of the Facility, uranium closure, clean up, and transition activities required for permanent closure, are within Risk Acceptance Guidelines. The Facility is classified as a Moderate Hazard Facility because of the potential for an unmitigated fire associated with the uranium storage buildings

  5. Monthly Weather Review

    National Oceanic and Atmospheric Administration, Department of Commerce — Supplements to the Monthly Weather Review publication. The Weather Bureau published the Monthly weather review Supplement irregularly from 1914 to 1949. The...

  6. Interim dry cask storage of irradiated Fast Flux Test Facility fuel

    Scott, P.L.

    1994-09-01

    The Fast Flux Test Facility (FFTF), located at the US Department of Energy's (DOE'S) Hanford Site, is the largest, most modern, liquid metal-cooled test reactor in the world. This paper will give an overview of the FFTF Spent Fuel Off load project. Major discussion areas will address the status of the fuel off load project, including an overview of the fuel off load system and detailed discussion on the individual components that make up the dry cask storage portion of this system. These components consist of the Interim Storage Cask (ISC) and Core Component Container (CCC). This paper will also discuss the challenges that have been addressed in the evolution of this project

  7. Colonie Interim Storage Site: Annual environmental report for calendar year 1990, Colonie, New York

    1991-09-01

    Environmental monitoring of the US Department of Energy's (DOE) Colonie Interim Storage Site (CISS) and surrounding area began in 1984. CISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sties where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The routine environmental monitoring program at CISS includes sampling networks for external gamma radiation exposures and for radium-226, throium-232, an total uranium concentrations in surface water, sediment, and groundwater. Additionally, the nonradiological parameters volatile and semivolatile organics, pesticides/polychlorinated biphenyls (PCBs), metals, total organic carbon (TOC), total organic halides (TOX), specific conductivity, and pH are measured in groundwater. 14 refs., 20 figs., 25 tabs

  8. Intoxication with metallic mercury

    Fichte, B.; Assmann, H.; Ritzau, F.

    1984-01-01

    Intoxications by metallic mercury are extremely rare. Report of a patient, who tried to commit suicide by subcutaneous injection of 500 g of metallic mercury. He died 16 months later in the course of the intoxication. A short review is given of effects and reactions of metallic mercury in the human organism. (orig.) [de

  9. Intoxication with metallic mercury

    Fichte, B.; Ritzau, F.; Assmann, H.

    1984-02-01

    Intoxications by metallic mercury are extremely rare. Report is given of a patient who tried to commit suicide by subcutaneous injection of 500 g of metallic mercury. He died 16 months later in the course of the intoxication. A short review is given of effects and reactions of metallic mercury in the human organism.

  10. Intoxication with metallic mercury

    Fichte, B.; Assmann, H.; Ritzau, F.

    1984-02-01

    Intoxications by metallic mercury are extremely rare. Report is given of a patient, who tried to commit suicide by subcutaneous injection of 500 g of metallic mercury. He died 16 months later in the course of the intoxication. A short review is given of effects and reactions of metallic mercury in the human organism.

  11. Subsurface Interim Measures/Interim Remedial Action Plan/ Environmental Assessment and Decision Document, Operable Unit No. 2

    1992-01-01

    The subject Interim Measures/Interim Remedial Action plan/Environmental Assessment (IM/IRAP/EA) addresses residual free-phase volatile organic compound (VOC) contamination suspected in the subsurface within an area identified as Operable Unit No. 2 (OU2). This IM/IRAP/EA also addresses radionuclide contamination beneath the 903 Pad at OU2. Although subsurface VOC and radionuclide contamination on represent a source of OU2 ground-water contamination, they pose no immediate threat to public health or the environment. This volume contains five appendices

  12. New York State interim waste management cost evaluation

    Ma, M.S.; Watts, R.J.; Jorgensen, J.R.; Rochester Gas and Electric Corp., NY)

    1985-01-01

    The purpose of this study is to investigate and quantify the comparative costs associated with including or excluding Class A utility wastes at a centralized interim waste management facility in New York State. The objective of the study is to assess the unit costs and total statewide costs associated with two distinct scenarios: (1) the case where non-utility Class A LLRW is received, incinerated and stored at the centralized interim facility, and utility Class A wastes are held without incineration at respective nuclear power plant interim onsite facilities without incineration; and (2) the alternative case where both utility and non-utility Class A wastes are accepted, incinerated and stored at the centralized facility. Unit costs to waste generators are estimated for each of the two cases described. This is followed by an estimation of the statewide cost impact to the public. The cost impact represents the cost differential resulting from the exclusion of utility Class A waste from the centralized NYS interim waste management facility. The principal factors comprising the cost differential include (1) higher unit disposal fees charged to non-utility waste generators, which are passed along in the costs of products and services; and (2) costs to utilities due to construction of additional onsite storage capacity, which in turn are charged to electric rate payers

  13. Options for the interim storage of spent fuel

    Kromar, M.; Kurincic, B.

    1995-01-01

    Different concepts for the interim storage of spent fuel arising from operation of a NPP are discussed. We considered at reactor as well as away from reactor storage options. Included are enhancements of existing storage capabilities and construction of a new wet or dry storage facility. (author)

  14. Fuel supply shutdown facility interim operational safety requirements

    Besser, R.L.; Brehm, J.R.; Benecke, M.W.; Remaize, J.A.

    1995-01-01

    These Interim Operational Safety Requirements (IOSR) for the Fuel Supply Shutdown (FSS) facility define acceptable conditions, safe boundaries, bases thereof, and management or administrative controls to ensure safe operation. The IOSRs apply to the fuel material storage buildings in various modes (operation, storage, surveillance)

  15. 17 CFR 210.8-03 - Interim financial statements.

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Interim financial statements... AND CONTENT OF AND REQUIREMENTS FOR FINANCIAL STATEMENTS, SECURITIES ACT OF 1933, SECURITIES EXCHANGE... ADVISERS ACT OF 1940, AND ENERGY POLICY AND CONSERVATION ACT OF 1975 Article 8 Financial Statements of...

  16. ASPECTS CONCERNING INTERIM FINANCIAL REPORTING IN ROMANIA: STANDARDS AND REGULATIONS

    Aristita Rotila

    2014-12-01

    Full Text Available The mechanisms employed for the communication of accounting information that is necessary for users in their economic decision-making process consist of the financial statements of an entity. All legal entities, no matter the domain of their activity, have the obligation to draw up annual financial statements for every completed financial year. For certain categories of entities, reporting obligations are also required for periods other than the annual reporting, throughout the financial year. It is the case of interim financial reporting. At the level of the international accounting framework, the aspects related to interim financial reporting are the subject of a separate standard, namely, IAS 34 Interim Financial Reporting. In Romania, the current system of accounting regulations concerning the annual financial statements comprises accounting regulations that comply with the European directives and which apply to the various categories of entities, on the one hand and, on the other, accounting regulations in line with the IFRS, which are applicable to other classes of entities from certain activity sectors. The accounting regulations that apply to each category refer to, among other things, the contents and the format of financial statements that have to be presented. Analysing the system of norms and regulations, this article identifies the requirements concerning interim financial reporting in Romania, with reference to the different types of entities.

  17. 39 CFR 211.4 - Interim personnel regulations.

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Interim personnel regulations. 211.4 Section 211.4... under the Postal Reorganization Act. (b) Continuation of Personnel Provisions of Former title 39, U.S.C... collective bargaining agreement under the Postal Reorganization Act, all provisions of former title 39, U.S.C...

  18. Students' interim literacies as a dynamic resource for teaching and ...

    This article explores the notion of 'interim literacies'by drawing on data from a research project which used linguistic and intertextual analysis of first year student writing in economics to investigate the intersection of academic discourse and student voice. This research has provided a rich set of data to illustrate the ways in ...

  19. 46 CFR 308.303 - Amounts insured under interim binder.

    2010-10-01

    ... 308.303 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.303 Amounts insured under interim binder. The amounts insured are the amounts specified in the Second Seamen's War Risk Policy (1955) or as modified by shipping...

  20. System Specification for Immobilized High-Level Waste Interim Storage

    CALMUS, R.B.

    2000-01-01

    This specification establishes the system-level functional, performance, design, interface, and test requirements for Phase 1 of the IHLW Interim Storage System, located at the Hanford Site in Washington State. The IHLW canisters will be produced at the Hanford Site by a Selected DOE contractor. Subsequent to storage the canisters will be shipped to a federal geologic repository

  1. Guidelines for interim storage of low level waste

    Hornibrook, C.; Castagnacci, A.; Clymer, G.; Kelly, J.; Naughton, M.; Saunders, P.; Stoner, P.; Walker, N.; Cazzolli, R.; Dettenmeier, R.; Loucks, L.; Rigsby, M.; Spall, M.; Strum, M.

    1992-12-01

    This report presents an overview of on-site storage of Low Level Waste while providing guidelines for using the complete Interim On-Site Storage of Low Level Waste report series. Overall, this report provides a methodology for planning and implementing on-site storage

  2. Single-Shell Tank (SST) Interim Stabilization Project Plan

    VLADIMIROFF, D.T.; BOYLES, V.C.

    2000-01-01

    This project plan establishes the management framework for the conduct of the CHG Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organization structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline

  3. Single-shell tank interim stabilization project plan

    Ross, W.E.

    1998-05-11

    This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  4. 78 FR 70244 - Electronic Interim Assistance Reimbursement Program

    2013-11-25

    ..., Social Security Online, at http://www.socialsecurity.gov . SUPPLEMENTARY INFORMATION: Background To be... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 416 [Docket No. SSA-2011-0104] RIN 0960-AH45 Electronic Interim Assistance Reimbursement Program AGENCY: Social Security Administration. ACTION: Notice of...

  5. 14 CFR 136.41 - Interim operating authority.

    2010-01-01

    ... AND NATIONAL PARKS AIR TOUR MANAGEMENT National Parks Air Tour Management § 136.41 Interim operating... terminate 180 days after the date on which an air tour management plan is established for the park and tribal lands; (6) Shall promote protection of national park resources, visitor experiences, and tribal...

  6. Effectiveness Monitoring Report, MWMF Tritium Phytoremediation Interim Measures.

    Hitchcock, Dan; Blake, John, I.

    2003-02-10

    This report describes and presents the results of monitoring activities during irrigation operations for the calendar year 2001 of the MWMF Interim Measures Tritium Phytoremediation Project. The purpose of this effectiveness monitoring report is to provide the information on instrument performance, analysis of CY2001 measurements, and critical relationships needed to manage irrigation operations, estimate efficiency and validate the water and tritium balance model.

  7. Public School Finance Problems in Texas. An Interim Report.

    Texas Research League, Austin.

    The U.S. District Court ruling in Rodriguez vs San Antonio Independent School District, which struck down Texas' school finance system as inequitable and unconstitutional, provided the impetus for publishing this interim report. The report documents the growing cost of State-supported public school programs--the primary concern prior to the…

  8. Natural gas monthly

    NONE

    1998-01-01

    The Natural Gas Monthly highlights activities, events, and analyses of interest to public and private sector organizations associated with the natural gas industry. Volume and price data are presented each month for natural gas production, distribution, consumption, and interstate pipeline activities. Producer-related activities and underground storage data are also reported. From time to time, the Natural Gas Monthly features articles designed to assist readers in using and interpreting natural gas information.

  9. Subsurface Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document, Operable Unit No. 2

    1992-01-01

    The subject Interim Measures/Interim Remedial Action plan/Environmental Assessment (IM/IRAP/EA) addresses residual free-phase volatile organic compound (VOC) contamination suspected in the subsurface within an area identified as Operable Unit No. 2 (OU2). This IM/IRAP/EA also addresses radionuclide contamination beneath the 903 Pad at OU2. Although subsurface VOC and radionuclide contamination on represent a source of OU2 ground-water contamination, they pose no immediate threat to public health or the environment. This IM/IRAP/EA identifies and evaluates interim remedial actions for removal of residual free-phase VOC contamination from three different subsurface environments at OU2. The term ''residual'' refers to the non-aqueous phase contamination remaining in the soil matrix (by capillary force) subsequent to the passage of non-aqueous or free-phase liquid through the subsurface. In addition to the proposed actions, this IM/IRAP/EA presents an assessment of the No Action Alternative. This document also considers an interim remedial action for the removal of radionuclides from beneath the 903 Pad

  10. Progress report, 24 months

    Juhl, Thomas Winther; Nielsen, Jakob Skov

    The work performed during the past 12 months (months 13 – 24) of the project has included the conclusion of Task 1 – Fundamental Studies and Task 2 – Multimirror Cutting Head Design. Work on Task 3 – Compact Cutting Head Design, and Task 4 – Interface Design has been carried out and the tests...... of the multimirror cutting head have been started....

  11. Progress report, 36 months

    Juhl, Thomas Winther; Nielsen, Jakob Skov

    The work performed during the past 12 months (months 13 – 24) of the project has included the conclusion of Task 1 – Fundamental Studies and Task 2 – Multimirror Cutting Head Design. Work on Task 3 – Compact Cutting Head Design, and Task 4 – Interface Design has been carried out and the tests...... of the multimirror cutting head have been started....

  12. Testing of Metal Cask and Concrete Cask

    Shirai, K.; Wataru, M.; Takeda, H.; Tani, J.; Arai, T.; Saegusa, T.

    2015-01-01

    In Japan, the first interim spent fuel storage facility (ISF) outside of nuclear power plant site in use of dual-purpose metal cask is being planned to start its commercial operation in 2012 in Mutsu city, Aomori prefecture. The CRIEPI (Central Research Institute of Electric Power Industry) has executed several study programs on demonstrative testing for interim storage of spent fuel, mainly related to metal cask and concrete cask storage technology to reflect in Japanese safety requirements for dry casks issued by NISA/METI (Nuclear and Industrial Safety Agency, Ministry of Economy and Trade Industry). On top of that, the Japan Nuclear Energy Safety Organization (JNES) has executed study programs on spent fuel integrity, etc. This paper introduces the summary of these research programs. (author)

  13. Reference values on safety regulation of land disposal of low level radioactive solid waste (the second interim report) and its incorporation into legal regulations

    Aoki, Terumi

    1994-01-01

    Safety regulation of land disposal of low level radioactive solid waste in Japan is based on 'the basic philosophy on the safety regulation of land disposal of low level radioactive solid waste' determined by the Nuclear safety Committee (October 1985). The basic philosophy on the upper limit of radioactivity of disposed wastes was published as the reference values in the interim report (February 1987) and in the second interim report (June 1992). In the second interim report, the upper limits of radioactivity are established for three types of solid radioactive wastes: 1) metals, incombustible or flame resistant wastes generated nuclear reactor facilities and solidified in vessels, 2) large metallic structures generated from decommissioning of reactor facilities and difficult to solidify in vessels, and 3) radioactive concrete waste generated from decommissioning of reactor facilities. The upper limits of radioactivity are presented for C-14, Co-60, Ni-63, Sr-90, Cs-137, alfa-emmitters, Ca-41 (for concrete) and Eu-152 (for concrete). Related laws and regulations in Japan on safe disposal of low level wastes are explained. (T.H.)

  14. A bioresorbable everolimus-eluting scaffold versus a metallic everolimus-eluting stent for ischaemic heart disease caused by de-novo native coronary artery lesions (ABSORB II): an interim 1-year analysis of clinical and procedural secondary outcomes from a randomised controlled trial

    Serruys, Patrick W.; Chevalier, Bernard; Dudek, Dariusz; Cequier, Angel; Carrié, Didier; Iniguez, Andres; Dominici, Marcello; van der Schaaf, René J.; Haude, Michael; Wasungu, Luc; Veldhof, Susan; Peng, Lei; Staehr, Peter; Grundeken, Maik J.; Ishibashi, Yuki; Garcia-Garcia, Hector M.; Onuma, Yoshinobu

    2015-01-01

    Despite rapid dissemination of an everolimus-eluting bioresorbable scaffold for treatment for coronary artery disease, no data from comparisons with its metallic stent counterpart are available. In a randomised controlled trial we aimed to compare an everolimus-eluting bioresorbable scaffold with an

  15. Alternatives for managing wastes from reactors and post-fission operations in the LWR fuel cycle. Volume 3. Alternatives for interim storage and transportation

    1976-05-01

    Volume III of the five-volume report contains information on alternatives for interim storage and transportation. Section titles are: interim storage of spent fuel elements; interim storage of chop-leach fuel bundle residues; tank storage of high-level liquid waste; interim storage of solid non-high-level wastes; interim storage of solidified high-level waste; and, transportation alternatives

  16. Comparisons of the tropospheric specific humidity from GPS radio occultations with ERA-Interim, NASA MERRA, and AIRS data

    Vergados, Panagiotis; Mannucci, Anthony J.; Ao, Chi O.; Verkhoglyadova, Olga; Iijima, Byron

    2018-03-01

    We construct a 9-year data record (2007-2015) of the tropospheric specific humidity using Global Positioning System radio occultation (GPS RO) observations from the Constellation Observing System for Meteorology, Ionosphere, and Climate (COSMIC) mission. This record covers the ±40° latitude belt and includes estimates of the zonally averaged monthly mean specific humidity from 700 up to 400 hPa. It includes three major climate zones: (a) the deep tropics (±15°), (b) the trade winds belts (±15-30°), and (c) the subtropics (±30-40°). We find that the RO observations agree very well with the European Centre for Medium-Range Weather Forecasts Re-Analysis Interim (ERA-Interim), the Modern-Era Retrospective Analysis for Research and Applications (MERRA), and the Atmospheric Infrared Sounder (AIRS) by capturing similar magnitudes and patterns of variability in the monthly zonal mean specific humidity and interannual anomaly over annual and interannual timescales. The JPL and UCAR specific humidity climatologies differ by less than 15 % (depending on location and pressure level), primarily due to differences in the retrieved refractivity. In the middle-to-upper troposphere, in all climate zones, JPL is the wettest of all data sets, AIRS is the driest of all data sets, and UCAR, ERA-Interim, and MERRA are in very good agreement, lying between the JPL and AIRS climatologies. In the lower-to-middle troposphere, we present a complex behavior of discrepancies, and we speculate that this might be due to convection and entrainment. Conclusively, the RO observations could potentially be used as a climate variable, but more thorough analysis is required to assess the structural uncertainty between centers and its origin.

  17. TARP Monthly Housing Scorecard

    Department of the Treasury — Treasury and the U.S. Department of Housing and Urban Development (HUD) jointly produce a Monthly Housing Scorecard on the health of the nation’s housing market. The...

  18. Molecule of the Month

    Molecule of the Month - Adamantane - A Plastic Piece of Diamond. J Chandrasekhar. Volume 16 Issue 12 ... Keywords. Adamantane; diamondoid systems; plastic crystals. ... Resonance – Journal of Science Education | News. © 2017 Indian ...

  19. Oceanographic Monthly Summary

    National Oceanic and Atmospheric Administration, Department of Commerce — Oceanographic Monthly Summary contains sea surface temperature (SST) analyses on both regional and ocean basin scales for the Atlantic, Pacific, and Indian Oceans....

  20. Plutonium Finishing Plant. Interim plutonium stabilization engineering study

    Sevigny, G.J.; Gallucci, R.H.; Garrett, S.M.K.; Geeting, J.G.H.; Goheen, R.S.; Molton, P.M.; Templeton, K.J.; Villegas, A.J. [Pacific Northwest Lab., Richland, WA (United States); Nass, R. [Nuclear Fuel Services, Inc. (United States)

    1995-08-01

    This report provides the results of an engineering study that evaluated the available technologies for stabilizing the plutonium stored at the Plutonium Finishing Plant located at the hanford Site in southeastern Washington. Further processing of the plutonium may be required to prepare the plutonium for interim (<50 years) storage. Specifically this document provides the current plutonium inventory and characterization, the initial screening process, and the process descriptions and flowsheets of the technologies that passed the initial screening. The conclusions and recommendations also are provided. The information contained in this report will be used to assist in the preparation of the environmental impact statement and to help decision makers determine which is the preferred technology to process the plutonium for interim storage.

  1. Rosiglitazone evaluated for cardiovascular outcomes--an interim analysis

    Home, Philip D; Pocock, Stuart J; Beck-Nielsen, Henning

    2007-01-01

    BACKGROUND: A recent meta-analysis raised concern regarding an increased risk of myocardial infarction and death from cardiovascular causes associated with rosiglitazone treatment of type 2 diabetes. METHODS: We conducted an unplanned interim analysis of a randomized, multicenter, open...... group). The primary end point was hospitalization or death from cardiovascular causes. RESULTS: Because the mean follow-up was only 3.75 years, our interim analysis had limited statistical power to detect treatment differences. A total of 217 patients in the rosiglitazone group and 202 patients...... in the control group had the adjudicated primary end point (hazard ratio, 1.08; 95% confidence interval [CI], 0.89 to 1.31). After the inclusion of end points pending adjudication, the hazard ratio was 1.11 (95% CI, 0.93 to 1.32). There were no statistically significant differences between the rosiglitazone...

  2. Interim safety basis compliance matrix for Trenches 31 and 34

    Ames, R.R.

    1994-01-01

    The tables provided in this document identify the specific requirements and basis for the administrative controls established in the Westinghouse Hanford Company (WHC) Solid Waste Burial Ground (SWBG) Interim Safety Basis (ISB) for operation of the Project W-025, Mixed Waste Lined Landfill (Trenches 31 and 34). The tables document the necessary controls and implementing procedures to ensure compliance with the requirements of the ISB. These requirements provide a basis for future Unreviewed Safety Questions (USQ) screening of applicable procedure changes, proposed physical modifications, tests, experiments, and occurrences. Table 1 provides the SWBG interim Operational Safety Requirements administrative controls matrix. The specific assumptions and commitments used in the safety analysis documents applicable to disposal of mixed wastes in Trenches 31 and 34 are provided in Table 2. Table 3 is provided to document the potential engineered and administrative mitigating features identified in the Preliminary Hazard Analysis (PHA) for disposal of mixed waste

  3. Plutonium Finishing Plant. Interim plutonium stabilization engineering study

    Sevigny, G.J.; Gallucci, R.H.; Garrett, S.M.K.; Geeting, J.G.H.; Goheen, R.S.; Molton, P.M.; Templeton, K.J.; Villegas, A.J.; Nass, R.

    1995-08-01

    This report provides the results of an engineering study that evaluated the available technologies for stabilizing the plutonium stored at the Plutonium Finishing Plant located at the hanford Site in southeastern Washington. Further processing of the plutonium may be required to prepare the plutonium for interim (<50 years) storage. Specifically this document provides the current plutonium inventory and characterization, the initial screening process, and the process descriptions and flowsheets of the technologies that passed the initial screening. The conclusions and recommendations also are provided. The information contained in this report will be used to assist in the preparation of the environmental impact statement and to help decision makers determine which is the preferred technology to process the plutonium for interim storage

  4. 105-C Reactor interim safe storage project technology integration plan

    Pulsford, S.K.

    1997-01-01

    The 105-C Reactor Interim Safe Storage Project Technology Integration Plan involves the decontamination, dismantlement, and interim safe storage of a surplus production reactor. A major goal is to identify and demonstrate new and innovative D and D technologies that will reduce costs, shorten schedules, enhance safety, and have the potential for general use across the RL complex. Innovative technologies are to be demonstrated in the following areas: Characterization; Decontamination; Waste Disposition; Dismantlement, Segmentation, and Demolition; Facility Stabilization; and Health and Safety. The evaluation and ranking of innovative technologies has been completed. Demonstrations will be selected from the ranked technologies according to priority. The contractor team members will review and evaluate the demonstration performances and make final recommendations to DOE

  5. Ad interim legal remedy in case of large projects

    Limberger, J.

    1985-01-01

    Action for ad interim judicial relief in response to large projects approved of by the authorities very frequently take several years until a decision is taken by the court. Experience has shown that this applies in particular to large projects such as the construction of nuclear power plants, large-size industrial plants, or airports. It has become regular practice by the authorities concerned to issue an order for immediate execution upon the plan approving decision and granting of licence for said projects, in accordance with section 80, sub-section (2), no.4 of the VwGO. The problems thus created with regard to interim legal remedy sought by the parties concerned are of great significance. The book in hand discusses the question as to whether the practice of the administrative authorities and the courts satisfies the requirements embodied in the law, to provide for efficient legal protection. (orig./HSCH) [de

  6. Interim Sanitary Landfill Groundwater Monitoring Report. 1997 Annual Report

    NONE

    1998-01-01

    Eight wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Interim Sanitary Landfill at the Savannah River Site (SRS). These wells are sampled semiannually to comply with the South Carolina Department of Health and Environmental Control Modified Municipal Solid Waste Permit 025500-1120 (formerly dWP-087A) and as part of the SRS Groundwater Monitoring Program.

  7. 105-H Reactor Interim Safe Storage Project Final Report

    Ison, E.G.

    2008-01-01

    The following information documents the decontamination and decommissioning of the 105-H Reactor facility, and placement of the reactor core into interim safe storage. The D and D of the facility included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, decontamination, demolition of the structure, and restoration of the site. The ISS work also included construction of the safe storage enclosure, which required the installation of a new roofing system, power and lighting, a remote monitoring system, and ventilation components.

  8. Terrestrial gravity data analysis for interim gravity model improvement

    1987-01-01

    This is the first status report for the Interim Gravity Model research effort that was started on June 30, 1986. The basic theme of this study is to develop appropriate models and adjustment procedures for estimating potential coefficients from terrestrial gravity data. The plan is to use the latest gravity data sets to produce coefficient estimates as well as to provide normal equations to NASA for use in the TOPEX/POSEIDON gravity field modeling program.

  9. Interim reliability evaluation program, Browns Ferry fault trees

    Stewart, M.E.

    1981-01-01

    An abbreviated fault tree method is used to evaluate and model Browns Ferry systems in the Interim Reliability Evaluation programs, simplifying the recording and displaying of events, yet maintaining the system of identifying faults. The level of investigation is not changed. The analytical thought process inherent in the conventional method is not compromised. But the abbreviated method takes less time, and the fault modes are much more visible

  10. Interim dry storage system technologies and innovations VARNA 2002

    Chollet, P.; Guenon, Y.

    2002-01-01

    The main concepts of the TN24 Family and NUHOMS System are explained in the paper. It is discussed how the NPPs specific requirements and economics trends contributes to the growing families of interim dry storage systems delivered under COGEMA LOGICTICS license. It is concluded that modular solutions are currently dominating because they are derived from main concepts evolved over time, benefited from both the transport aspects with internationally recognised stringent regulations, and various specific ISFSI requirements and economic trends

  11. Interim Stabilization Equipment Essential and Support Drawing Plan

    HORNER, T.M.

    2000-01-01

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. [CHG 2000a]. Support Drawings are those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings. [CHG 2000a

  12. Interim Stabilization Equipment Essential and Support Drawing Plan

    KOCH, M.R.

    1999-01-01

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings: Those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. Support Drawings: Those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings

  13. FRACTIONAL CRYSTALLIZATION TESTING WITH INTERIM PRETREATMENT SYSTEM FEEDS

    HERTING DL

    2008-01-01

    The fractional crystallization process was developed as a pretreatment method for saltcake waste retrieved from Hanford single-shell tanks (SST). The process separates the retrieved SST waste into a high-level waste stream containing the bulk of the radionuclides and a low-activity waste stream containing the bulk of the nonradioactive sodium salts. The Interim Pretreatment System project shifted the focus on pretreatment planning from SST waste to double-shell tank waste

  14. Waste Encapsulation and Storage Facility interim operational safety requirements

    Covey, L I

    2000-01-01

    The Interim Operational Safety Requirements (IOSRs) for the Waste Encapsulation and Storage Facility (WESF) define acceptable conditions, safe boundaries, bases thereof, and management or administrative controls required to ensure safe operation during receipt and inspection of cesium and strontium capsules from private irradiators; decontamination of the capsules and equipment; surveillance of the stored capsules; and maintenance activities. Controls required for public safety, significant defense-in-depth, significant worker safety, and for maintaining radiological consequences below risk evaluation guidelines (EGs) are included.

  15. Transport casks help solve spent fuel interim storage problems

    Dierkes, P.; Janberg, K.; Baatz, H.; Weinhold, G.

    1980-01-01

    Transport casks can be used as storage modules, combining the inherent safety of passive cooling with the absence of secondary radioactive waste and the flexibility to build up storage capacity according to actual requirements. In the Federal Republic of Germany, transport casks are being developed as a solution to its interim storage problems. Criteria for their design and licensing are outlined. Details are given of the casks and the storage facility. Tests are illustrated. (U.K.)

  16. Dry storage of spent fuel elements: interim facility

    Quihillalt, O.J.

    1993-01-01

    Apart from the existing facilities to storage nuclear fuel elements at Argentina's nuclear power stations, a new interim storage facility has been planned and projected by the Argentinean Atomic Energy Commission (CNEA) that will be constructed by private group. This article presents the developments and describes the activities undertaken until the national policy approach to the final decision for the most suitable alternative to be adopted. (B.C.A.). 09 refs, 01 fig, 09 tabs

  17. The cost and impact of the interim federal health program cuts on child refugees in Canada.

    Andrea Evans

    Full Text Available INTRODUCTION: On June 30, 2012, Interim Federal Health Program (IFHP funding was cut for refugee claimant healthcare. The potential financial and healthcare impacts of these cuts on refugee claimants are unknown. METHODS: We conducted a one-year retrospective chart review spanning 6 months before and after IFHP funding cuts at The Hospital for Sick Children, a tertiary care children's hospital in Toronto. We analyzed emergency room visits characteristics, admission rates, reasons for admission, and financial records including billing from Medavie Blue Cross. RESULTS: There were 173 refugee children visits to the emergency room in the six months before and 142 visits in the six months after funding cuts. The total amount billed to the IFHP program during the one-year of this study was $131,615. Prior to the IFHP cuts, 46% of the total emergency room bills were paid by IFHP compared to 7% after the cuts (p<0.001. INTERPRETATION: After the cuts to the IFHP, The Hospital for Sick Children was unable to obtain federal health coverage for the vast majority of refugee claimant children registered under the IFHP. This preliminary analysis showed that post-IFHP cuts healthcare costs at the largest tertiary pediatric institution in the country increased.

  18. Behavior of spent nuclear fuel and storage system components in dry interim storage.

    Johnson, A.B. Jr.; Gilbert, E.R.; Guenther, R.J.

    1982-08-01

    Irradiated nuclear fuel has been handled under dry conditions since the early days of nuclear reactor operation, and use of dry storage facilities for extended management of irradiated fuel began in 1964. Irradiated fuel is currently being stored dry in four types of facilities: dry wells, vaults, silos, and metal casks. Essentially all types of irradiated nuclear fuel are currently stored under dry conditions. Gas-cooled reactor (GCR) and liquid metal fast breeder reactor (LMFBR) fuels are stored in vaults and dry wells. Certain types of fuel are being stored in licensed dry storage facilities: Magnox fuel in vaults in the United Kingdom and organic-cooled reactor (OCR) fuel in silos in Canada. Dry storage demonstrations are under way for Zircaloy-clad fuel from boiling water reactors BWR's, pressurized heavy-water reactors (PHWRs), and pressurized water reactors (PWRs) in all four types of dry storage facilities. The demonstrations and related hot cell and laboratory tests are directed toward expanding the data base and establishing a licensing basis for dry storage of water reactor fuel. This report reviews the scope of dry interim storage technology, the performance of fuel and facility materials, the status of programs in several countries to license dry storage of water reactor fuel, and the characteristics of water reactor fuel that relate to dry storage conditions.

  19. Cost comparisons of wet and dry interim storage facilities for PWR spent nuclear fuel in Korea

    Cho, Chun-Hyung; Kim, Tae-Man; Seong, Ki-Yeoul; Kim, Hyung-Jin; Yoon, Jeong-Hyoun

    2011-01-01

    Research highlights: → We compare the costs of wet and dry interim storage facilities for PWR spent fuel. → We use the parametric method and quotations to deduce unknown cost items. → Net present values and levelized unit prices are calculated for cost comparisons. → A system price is the most decisive factor in cost comparisons. - Abstract: As a part of an effort to determine the ideal storage solution for pressurized water reactor (PWR) spent nuclear fuel, a cost assessment was performed to better quantify the competitiveness of several storage types. Several storage solutions were chosen for comparison, including three dry storage concepts and a wet storage concept. The net present value (NPV) and the levelized unit cost (LUC) of each solution were calculated, taking into consideration established scenarios and facility size. Wet storage was calculated to be the most expensive solution for a 1700 MTU facility, and metal cask storage marked the highest cost for a 5000 MTU facility. Sensitivity analyses on discount rate, metal cask price, operation and maintenance cost, and facility size revealed that the system price is the most decisive factor affecting competitiveness among the storage types.

  20. Behavior of spent nuclear fuel and storage-system components in dry interim storage

    Johnson, A.B. Jr.; Gilbert, E.R.; Guenther, R.J.

    1982-08-01

    Irradiated nuclear fuel has been handled under dry conditions since the early days of nuclear reactor operation, and use of dry storage facilities for extended management of irradiated fuel began in 1964. Irradiated fuel is currently being stored dry in four types of facilities: dry wells, vaults, silos, and metal casks. Essentially all types of irradiated nuclear fuel are currently stored under dry conditions. Gas-cooled reactor (GCR) and liquid metal fast breeder reactor (LMFBR) fuels are stored in vaults and dry wells. Certain types of fuel are being stored in licensed dry storage facilities: Magnox fuel in vaults in the United Kingdom and organic-cooled reactor (OCR) fuel in silos in Canada. Dry storage demonstrations are under way for Zircaloy-clad fuel from boiling water reactors BWR's, pressurized heavy-water reactors (PHWRs), and pressurized water reactors (PWRs) in all four types of dry storage facilities. The demonstrations and related hot cell and laboratory tests are directed toward expanding the data base and establishing a licensing basis for dry storage of water reactor fuel. This report reviews the scope of dry interim storage technology, the performance of fuel and facility materials, the status of programs in several countries to license dry storage of water reactor fuel, and the characteristics of water reactor fuel that relate to dry storage conditions

  1. Cost comparisons of wet and dry interim storage facilities for PWR spent nuclear fuel in Korea

    Cho, Chun-Hyung, E-mail: skycho@krmc.or.kr [Korea Radioactive Waste Management Corporation, 1045 Daedeokdaero, Yuseong-Gu, Daejeon 305-353 (Korea, Republic of); Kim, Tae-Man; Seong, Ki-Yeoul; Kim, Hyung-Jin; Yoon, Jeong-Hyoun [Korea Radioactive Waste Management Corporation, 1045 Daedeokdaero, Yuseong-Gu, Daejeon 305-353 (Korea, Republic of)

    2011-05-15

    Research highlights: > We compare the costs of wet and dry interim storage facilities for PWR spent fuel. > We use the parametric method and quotations to deduce unknown cost items. > Net present values and levelized unit prices are calculated for cost comparisons. > A system price is the most decisive factor in cost comparisons. - Abstract: As a part of an effort to determine the ideal storage solution for pressurized water reactor (PWR) spent nuclear fuel, a cost assessment was performed to better quantify the competitiveness of several storage types. Several storage solutions were chosen for comparison, including three dry storage concepts and a wet storage concept. The net present value (NPV) and the levelized unit cost (LUC) of each solution were calculated, taking into consideration established scenarios and facility size. Wet storage was calculated to be the most expensive solution for a 1700 MTU facility, and metal cask storage marked the highest cost for a 5000 MTU facility. Sensitivity analyses on discount rate, metal cask price, operation and maintenance cost, and facility size revealed that the system price is the most decisive factor affecting competitiveness among the storage types.

  2. Interim data report for the safety assessment SR-Can

    Vahlund, Fredrik; Andersson, Johan

    2004-08-01

    This document is the interim data report in the project SR-Can. The purpose of the data report is to present input data, with uncertainty estimates, for the SR-Can assessment calculations. Besides input data, the report also describes the standardised procedures used when deriving the input data and the corresponding uncertainty estimates. However, in the present interim version of the report (written in the initial stage of the project when site characterisation has yet not been completed) the standardised procedures have not been possible to apply for most of the data and, in order to present a compilation of the data used in the assessment, much of the input data is presented without following the standardised procedures. This will however be changed for the final version of the SR-Can data report, in order to show the methodology that will be used in the final version one example of how input data will be presented is included (migration data for buffer) . The recommended input data for the assessment calculations are, for the interim version, mainly based on SR 97 Beberg data, these are merely presented without any background or uncertainty discussion (this is presented in the SR 97 data report)

  3. Fast-mixed spectrum reactor interim report initial feasibility study

    Fischer, G.J.; Cerbone, R.J.

    1979-01-01

    The report summarizes the results of an initial four-month feasibility study of the Fast-Mixed Spectrum Reactor (FMSR). Reactor physics, fuel cycle, and thermal-hydraulic analyses were performed on a reference design. These results when coupled to a fuel and materials evaluation performed in cooperation with the Argonne National Laboratory indicate that the FMSR is feasible provided the fuels, cladding, and subassembly ducts can survive a peak fuel burnup of 15 to 20 atom percent heavy metal and peak fluences of 8 x 10 23 (nvt > 0.1 MeV). The results of this short study have also provided a basis for exploring alternative designs requiring significantly lower peak burnup and fluences for their operation

  4. The Interim Financial Reporting in the Spirit of the IAS 34 Norm

    Ovidia Doinea

    2008-01-01

    The role of an interim financial reporting is to allow the information users to acknowledge the activity of an entity on period shorter than financial exercise from the perspective of the available profits and cash flows generated as well as from the point of view of its financial position and liquidity. The interim financial reporting includes a complete or condensed set of financial statements which target to update the last financial reporting, usually the annual report. The interim financ...

  5. Immobilized high-level waste interim storage alternatives generation and analysis and decision report

    CALMUS, R.B.

    1999-01-01

    This report presents a study of alternative system architectures to provide onsite interim storage for the immobilized high-level waste produced by the Tank Waste Remediation System (TWRS) privatization vendor. It examines the contract and program changes that have occurred and evaluates their impacts on the baseline immobilized high-level waste (IHLW) interim storage strategy. In addition, this report documents the recommended initial interim storage architecture and implementation path forward

  6. Interim guidelines for protecting fire-fighting personnel from multiple hazards at nuclear plant sites

    Klein, A.R.; Bloom, C.W.

    1989-07-01

    This report provides interim guidelines for reducing the impact to fire fighting and other supporting emergency response personnel from the multiple hazards of radiation, heat stress, and trauma when fighting a fire in a United States commercial nuclear power plant. Interim guidelines are provided for fire brigade composition, training, equipment, procedures, strategies, heat stress and trauma. In addition, task definitions are provided to evaluate and further enhance the interim guidelines over the long term. 19 refs

  7. NMSBA Leveraged Project Interim Status Report

    Ivanov, Sergei A. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-10-05

    We have investigated the quality of copper particles available on the market today and determined their complete unsuitability to be used for copper inks, since all of them were significantly oxidized: there was only 50% of metallic copper in each batch and the rest was Cu2O and CuO. To date, we have fully identified the challenges and developed the synthesis for large amounts of the copper ink precursor, namely, copper(I) mesityl. Currently, the amounts of tens of grams of the precursor have been obtained. From this precursor, four small batches of copper nanoparticles (50 mg each) have been synthesized to investigate the possibility of decreasing particle sensitivity to oxygen. These particles have been treated with different surface-stabilizing agents (namely, octylamine, oleylamine, pyridine, benzotriazole, and dodecanethiol) in order to investigate their influence on particle oxygen sensitivity. A batch of copper nanoparticles in the amount of 2 grams has also been synthesized in order to start preparation of test ink batches with different solvents, surfactants, and stabilizers.

  8. Interim data monitoring to enroll higher-risk participants in HIV prevention trials

    Umo-Otong John

    2009-06-01

    Full Text Available Abstract Background Lower-than-expected incidence of HIV undermines sample size calculations and compromises the power of a HIV prevention trial. We evaluated the effectiveness of interim monitoring of HIV infection rates and on-going modification of recruitment strategies to enroll women at higher risk of HIV in the Cellulose Sulfate Phase III study in Nigeria. Methods We analyzed prevalence and incidence of HIV and other sexually transmitted infections, demographic and sexual behavior characteristics aggregated over the treatment groups on a quarterly basis. The site investigators were advised on their recruitment strategies based on the findings of the interim analyses. Results A total of 3619 women were screened and 1644 enrolled at the Ikeja and Apapa clinics in Lagos, and at the Central and Peripheral clinics in Port Harcourt. Twelve months after study initiation, the overall incidence of HIV was less than one-third of the pre-study assumption, with rates of HIV that varied substantially between clinics. Due to the low prevalence and incidence rates of HIV, it was decided to close the Ikeja clinic in Lagos and to find new catchment areas in Port Harcourt. This strategy was associated with an almost two-fold increase in observed HIV incidence during the second year of the study. Conclusion Given the difficulties in estimating HIV incidence, a close monitoring of HIV prevalence and incidence rates during a trial is warranted. The on-going modification of recruitment strategies based on the regular analysis of HIV rates appeared to be an efficient method for targeting populations at greatest risk of HIV infection and increasing study power in the Nigeria trial. Trial Registration The trial was registered with the ClinicalTrials.gov registry under #NCT00120770 http://clinicaltrials.gov/ct2/show/NCT00120770

  9. Monthly progress report

    1975-06-01

    This monthly report of the SCPRI exposes an interpretation of the principal results concerning the surveillance of radioactivity in the environment: atmospheric dusts(air at ground level, high altitude air), rainwater, surface water, underground water, irrigation water, drinking water, food chain (milk, plants, cattle, fish), sea water around nuclear plant sites and other sites. The activities of various radioisotopes are presented in tables ( 7 Be, 95 Zr and 95 Nb, 103 Ru, 131 I, 137 Cs, 140 Ba and 140 La, 90 Sr, 106 Ru and 106 Rh, 226 Ra, 54 Mn, U and T). A monthly bibliographic selection is also presented [fr

  10. Monthly progress report

    1975-03-01

    This monthly report of the SCPRI exposes an interpretation of the principal results concerning the surveillance of radioactivity in the environment: atmospheric dusts (air at ground level, high altitude air), rainwater, surface water, underground water, irrigation water, drinking water, food chain (milk, plants, cattle, fish), sea water around nuclear plant sites and other sites. The activities of various radioisotopes are presented in tables ( 7 Be, 95 Zr and 95 Nb, 103 Ru, 131 I, 137 Cs, 140 Ba and 140 La, 90 Sr, 106 Ru and 106 Rh, 226 Ra, 54 Mn, U and T). A monthly bibliographic selection is also presented [fr

  11. 24-month fuel cycles

    Rosenstein, R.G.; Sipes, D.E.; Beall, R.H.; Donovan, E.J.

    1986-01-01

    Twenty-four month reload cycles can potentially lessen total power generation costs. While 24-month cores increase purchased fuel costs, the longer cycles reduce the number of refueling outages and thus enhance plant availability; men-rem exposure to site personnel and other costs associated with reload core design and licensing are also reduced. At dual unit sites an operational advantage can be realized by refueling each plant alternately on a 1-year offset basis. This results in a single outage per site per year which can be scheduled for off-peak periods or when replacement power costs are low

  12. Monthly progress report

    1975-04-01

    This monthly report of the SCPRI exposes an interpretation of the principal results concerning the surveillance of radioactivity in the environment: atmospheric dusts (air at ground level, high altitude air), rainwater, surface water, underground water, irrigation water, drinking water, food chain (milk plants, cattle, fish), seawater around nuclear plant sites and other sites. The activities of various radioisotopes are presented in tables ( 7 Be, 95 Zr and 95 Nb, 103 Ru, 131 I, 137 Cs, 140 Ba and 140 La, 90 Sr, 106 Ru and 106 Rh, 226 Ra, 54 Mn U and T). A monthly bibliographic selection is also presented [fr

  13. Monthly progress report

    1975-01-01

    This monthly report of the SCPRI exposes an interpretation of the principal results concerning the surveillance of radioactivity in the environment: atmospheric dusts (air at ground level, high altitude air), rainwater, surface water, underground water, irrigation water, drinking water, food chain (milk, plants, cattle, fish), sea water around nuclear plant sites and other sites. The activities of various radioisotopes are presented in tables ( 7 Be, 95 Zr and 95 Nb, 103 Ru, 131 I, 137 Cs, 140 Ba and 140 La, 90 Sr, 106 Ru and 106 Rh, 226 Ra, 54 Mn, U and T). A monthly bibliographic selection is also presented [fr

  14. Monthly progress report

    1975-02-01

    This monthly report of the SCPRI exposes an interpretation of the principal results concerning the surveillance of radioactivity in the environment: atmospheric dusts (air at ground level, high altitude air), rainwater, surface water, underground water, irrigation water, drinking water, food chain (milk, plants, cattle, fish), sea water around nuclear plant sites and other sites. The activities of various radioisotopes are presented in tables ( 7 Be, 95 Zr and 95 Nb, 103 Ru, 131 I, 137 Cs, 140 Ba and 140 La, 90 Sr, 106 Ru and 106 Rh, 226 Ra, 54 Mn, U and T). A monthly bibliographic selection is also presented [fr

  15. Interim policy on establishment and operation of internet open, anonymous information servers and services

    Acting Dean of Computer and Information Services

    1995-01-01

    Purpose. To establish interim NPS general policy regarding establishment and operation of Open, Anonymous Information Servers and Services, such as World Wide Web (http), Gopher, Anonymous FTP, etc...

  16. Molecule of the Month

    Home; Journals; Resonance – Journal of Science Education; Volume 1; Issue 2. Molecule of the Month Isomers of Benzene - Still Pursuing Dreams. J Chandrasekhar. Feature Article Volume 1 Issue 2 February 1996 pp 80-83. Fulltext. Click here to view fulltext PDF. Permanent link:

  17. Molecule of the Month

    Home; Journals; Resonance – Journal of Science Education; Volume 16; Issue 12. Molecule of the Month - A Stable Dibismuthene - A Compound with a Bi-Bi Double Bond. V Chandrasekhar. Volume 16 ... Author Affiliations. V Chandrasekhar1. Department of Chemistry, Indian Institute of Technology, Kanpur 208 016, India.

  18. Monthly energy review

    NONE

    1997-12-01

    This document presents an overview of the Energy Information Administration`s (EIA) recent monthly energy statistics. The statistics cover the major activities of U.S. production, consumption, trade, stocks, and prices for petroleum, natural gas, coal, electricity, and nuclear energy. Also included are international energy and thermal and metric conversion factors.

  19. Photos of the month

    Claudia Marcelloni de Oliveira

    Congratulations to Adele Rimoldi, ATLAS physicist from Pavia, who ran her first marathon in New York last month. Adele completed the 42.2 km in a time of 4:49:19. She sure makes it look easy!!! The ATLAS pixel service quarter panel in SR1

  20. Molecule of the Month

    Home; Journals; Resonance – Journal of Science Education; Volume 2; Issue 5. Molecule of the Month Molecular–Chameleon: Solvatochromism at its Iridescent Best! Photon Rao. Feature Article Volume 2 Issue 5 May 1997 pp 69-72. Fulltext. Click here to view fulltext PDF. Permanent link:

  1. Heavy and Overweight Vehicle Defects Interim Report

    Siekmann, Adam [ORNL; Capps, Gary J [ORNL

    2012-12-01

    The Federal Highway Administration (FHWA), along with the Federal Motor Carrier Safety Administration (FMCSA), has an interest in overweight commercial motor vehicles, how they affect infrastructure, and their impact on safety on the nation s highways. To assist both FHWA and FMCSA in obtaining more information related to this interest, data was collected and analyzed from two separate sources. A large scale nationwide data collection effort was facilitated by the Commercial Vehicle Safety Alliance as part of a special study on overweight vehicles and an additional, smaller set, of data was collected from the state of Tennessee which included a much more detailed set of data. Over a six-month period, 1,873 Level I inspections were performed in 18 different states that volunteered to be a part of this study. Of the 1,873 inspections, a vehicle out-of-service (OOS) violation was found on 44.79% of the vehicles, a rate significantly higher than the national OOS rate of 27.23%. The main cause of a vehicle being placed OOS was brake-related defects, with approximately 30% of all vehicles having an OOS brake violation. Only about 4% of vehicles had an OOS tire violation, and even fewer had suspension and wheel violations. Vehicle weight violations were most common on an axle group as opposed to a gross vehicle weight violation. About two thirds of the vehicles cited with a weight violation were overweight on an axle group with an average amount of weight over the legal limit of about 2,000 lbs. Data collection is scheduled to continue through January 2014, with more potentially more states volunteering to collect data. More detailed data collections similar to the Tennessee data collection will also be performed in multiple states.

  2. Electric power monthly

    Smith, Sandra R.; Johnson, Melvin; McClevey, Kenneth; Calopedis, Stephen; Bolden, Deborah

    1992-05-01

    The Electric Power Monthly is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the national, Census division, and State levels for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, cost of fuel, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fuel are also displayed for the North American Electric Reliability Council (NERC) regions. Additionally, statistics by company and plant are published in the EPM on capability of new plants, new generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fuel.

  3. Petroleum marketing monthly

    NONE

    1995-08-01

    The Petroleum Marketing Monthly (PMM) provides information and statistical data on a variety of crude oils and refined petroleum products. The publication presents statistics on crude oil costs and refined petroleum products sales for use by industry, government, private sector analysts, educational institutions, and consumers. Data on crude oil include the domestic first purchase price, the f.o.b. and landed cost of imported crude oil, and the refiners` acquisition cost of crude oil. Refined petroleum product sales data include motor gasoline, distillates, residuals, aviation fuels, kerosene, and propane. The Petroleum Marketing Division, Office of Oil and Gas, Energy Information Administration ensures the accuracy, quality, and confidentiality of the published data in the Petroleum Marketing Monthly.

  4. Petroleum marketing monthly

    NONE

    1996-07-01

    Petroleum Marketing Monthly (PPM) provides information and statistical data on a variety of crude oils and refined petroleum products. The publication presents statistics on crude oil costs and refined petroleum products sales for use by industry, government, private sector analysts, educational institutions, and consumers. Data on crude oil include the domestic first purchase price, the f.o. b. and landed cost of imported crude oil, and the refiners` acquisition cost of crude oil. Refined petroleum product sales data include motor gasoline, distillates, residuals, aviation fuels, kerosene, and propane. The Petroleum Marketing Division, Office of Oil and Gas, Energy Information Administration ensures the accuracy, quality, and confidentiality of the published data in the Petroleum Marketing Monthly.

  5. Petroleum marketing monthly

    NONE

    1996-02-01

    The Petroleum Marketing Monthly (PMM) provides information and statistical data on a variety of crude oils and refined petroleum products. The publication presents statistics on crude oil costs and refined petroleum products sales for use by industry, government, private sector analysts, educational institutions, and consumers. Data on crude oil include the domestic first purchase price, the f.o.b. and landed cost of imported crude oil, and the refiners acquisition cost of crude oil. Refined petroleum product sales data include motor gasoline, distillates, residuals, aviation fuels, kerosene, and propane. The Petroleum Marketing Division, Office of Oil and Gas, Energy Information Administration ensures the accuracy, quality, and confidentiality of the published data in the Petroleum Marketing Monthly.

  6. Electric power monthly

    NONE

    1995-08-01

    The Energy Information Administration (EIA) prepares the Electric Power Monthly (EPM) for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. This publication provides monthly statistics for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source, consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead.

  7. Medical Surveillance Monthly Report

    2016-12-01

    Illness Prevention and Sun Safety. “Sun Safety.” https:// phc.amedd.army.mil/ topics /discond/hipss/Pages/ SunSafety.aspx. Accessed on 7 December 2016. 22...febrile illness; however, after its wide- spread introduction into immunologically MSMR Vol. 23 No. 12 December 2016 Page 8 naïve populations, a...October 2016 (data as of 22 November 2016) MSMR’s Invitation to Readers Medical Surveillance Monthly Report (MSMR) invites readers to submit topics for

  8. Environmental survey of two interim dumpsites, Middle Atlantic Bight from 05 November 1973 to 10 November 1973 (NODC Accession 7501280)

    National Oceanic and Atmospheric Administration, Department of Commerce — A second oceanographic survey cruise was made to an interim municipal sludge dumpsite and initially to an interim dumpsite for the disposal of industrial acid waste...

  9. 42 CFR 93.401 - Interaction with other offices and interim actions.

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Interaction with other offices and interim actions. 93.401 Section 93.401 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES... Human Services General Information § 93.401 Interaction with other offices and interim actions. (a) ORI...

  10. A comparison of the value relevance of interim and annual financial statements

    Mbalenhle Zulu

    2017-03-01

    Aim: It explores whether the value relevance of interim financial statements is higher than the value relevance of annual financial statements. Finally, it investigates whether accounting information published in interim and annual financial statements has incremental value relevance. Setting: Data for the period from 1999 to 2012 were collected from a sample of non-financial companies listed on the Johannesburg Stock Exchange. Method: The Ohlson model to investigate the value relevance of accounting information was used for the study. Results: The results show that interim book value of equity is value relevant while interim earnings are not. Interim financial statements appear to have higher value relevance than annual financial statements. The value relevance of interim and annual accounting information has remained fairly constant over the sample period. Incremental comparisons provide evidence that additional book value of equity and earnings that accrue to a company between interim and annual reporting dates are value relevant. Conclusion: The study was conducted over a long sample period (1999–2012, in an era when a technology-driven economy and more timely reporting media could have had an effect on the value relevance of published accounting information. To the best of our knowledge, this is the first study to evaluate and compare the value relevance of published interim and annual financial statements.

  11. PROJECT W-551 INTERIM PRETREATMENT SYSTEM TECHNOLOGY SELECTION SUMMARY DECISION REPORT AND RECOMMENDATION

    CONRAD EA

    2008-01-01

    This report provides the conclusions of the tank farm interim pretreatment technology decision process. It documents the methodology, data, and results of the selection of cross-flow filtration and ion exchange technologies for implementation in project W-551, Interim Pretreatment System. This selection resulted from the evaluation of specific scope criteria using quantitative and qualitative analyses, group workshops, and technical expert personnel

  12. Conceptual design report for immobilized high-level waste interim storage facility (Phase 1)

    Burgard, K.C.

    1998-01-01

    The Hanford Site Canister Storage Building (CSB Bldg. 212H) will be utilized to interim store Phase 1 HLW products. Project W-464, Immobilized High-Level Waste Interim Storage, will procure an onsite transportation system and retrofit the CSB to accommodate the Phase 1 HLW products. The Conceptual Design Report establishes the Project W-464 technical and cost basis

  13. 18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water... Director of the Office of Energy Market Regulation; or (ii) Deny the Administrator's interim rate request...

  14. 78 FR 41125 - Interim Enforcement Policy for Permanent Implant Brachytherapy Medical Event Reporting

    2013-07-09

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0114] Interim Enforcement Policy for Permanent Implant Brachytherapy Medical Event Reporting AGENCY: Nuclear Regulatory Commission. ACTION: Policy statement; revision. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing an interim Enforcement Policy that allows...

  15. Interim format and content for a physical security plan for nuclear power plants

    1977-02-01

    The document serves as interim guidance to assist the licensee or applicant in the preparation of a physical security plan. It is to be used in conjunction with interim acceptance criteria for physical security programs, which will be distributed at a later date

  16. 42 CFR 417.572 - Budget and enrollment forecast and interim reports.

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Budget and enrollment forecast and interim reports... PLANS, AND HEALTH CARE PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.572 Budget and enrollment forecast and interim reports. (a) Annual submittal. The HMO or CMP must submit an annual operating budget...

  17. Conceptual design report for immobilized high-level waste interim storage facility (Phase 1)

    Burgard, K.C.

    1998-04-09

    The Hanford Site Canister Storage Building (CSB Bldg. 212H) will be utilized to interim store Phase 1 HLW products. Project W-464, Immobilized High-Level Waste Interim Storage, will procure an onsite transportation system and retrofit the CSB to accommodate the Phase 1 HLW products. The Conceptual Design Report establishes the Project W-464 technical and cost basis.

  18. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  19. The PDF4LHC Working Group Interim Report

    Alekhin, Sergey; Ball, Richard D.; Bertone, Valerio; Blumlein, Johannes; Botje, Michiel; Butterworth, Jon; Cerutti, Francesco; Cooper-Sarkar, Amanda; de Roeck, Albert; Del Debbio, Luigi; Feltesse, Joel; Forte, Stefano; Glazov, Alexander; Guffanti, Alberto; Gwenlan, Claire; Huston, Joey; Jimenez-Delgado, Pedro; Lai, Hung-Liang; Latorre, Jose I.; McNulty, Ronan; Nadolsky, Pavel; Olaf Moch, Sven; Pumplin, Jon; Radescu, Voica; Rojo, Juan; Sjostrand, Torbjorn; Stirling, W.J.; Stump, Daniel; Thorne, Robert S.; Ubiali, Maria; Vicini, Alessandro; Watt, Graeme; Yuan, C.-P.

    2011-01-01

    This document is intended as a study of benchmark cross sections at the LHC (at 7 TeV) at NLO using modern parton distribution functions currently available from the 6 PDF fitting groups that have participated in this exercise. It also contains a succinct user guide to the computation of PDFs, uncertainties and correlations using available PDF sets. A companion note, also submitted to the archive, provides an interim summary of the current recommendations of the PDF4LHC working group for the use of parton distribution functions and of PDF uncertainties at the LHC, for cross section and cross section uncertainty calculations.

  20. Interim report on the TMI-2 purification filter examination

    Mason, R.E.; Hobbins, R.R.; Cook, B.A.; MacDonald, P.E.

    1983-02-01

    Filters from the purification/makeup system of the Three Mile Island Unit 2 Reactor were examined after the March 28, 1979, accident to determine the character of the debris transported to the filters. The general condition of the filters is presented. Material was removed from the filters and examined. The elemental and radionuclide makeup of the debris is discussed. Distribution of particle size and shape is presentd for some of the material examined. This is an interim report. When the investigation is completed, another report summarizing all of the data will be issued

  1. Cost estimation of interim dry storage for Atucha I NPP

    Bergallo, Juan E.; Fuenzalida Troyano, Carlos S.

    2007-01-01

    A joint effort between NASA and CNEA has been performed in order to evaluate and fix the strategy of interim spent fuel storage for Atucha I nuclear power plant. In this work the cost estimation on the proposed system was performed in order to fix the parameter and design criteria for the next engineering step. The main results achieved show that both alternatives are all in the same range of costs per unit of mass to be stored, the impact on electricity cost is less than 1 US mills/KWh and the scaling factor achieved is 0.85. (author) [es

  2. Hanford low-level tank waste interim performance assessment

    Mann, F.M.

    1997-01-01

    The Hanford Low-Level Tank Waste Interim Performance Assessment examines the long-term environmental and human health effects associated with the disposal of the low-level fraction of the Hanford single and double-shell tank waste in the Hanford Site 200 East Area. This report was prepared as a good management practice to provide needed information about the relationship between the disposal system design and performance early in the disposal system project cycle. The calculations in this performance assessment show that the disposal of the low-level fraction can meet environmental and health performance objectives

  3. Nondestructive evaluation of creep-fatigue damage: an interim report

    Nickell, R.E.

    1977-02-01

    In view of the uncertainties involved in designing against creep-fatigue failure and the consequences of such failures in Class 1 nuclear components that operate at elevated temperature, the possibility of intermittent or even continuous non-destructive examination of these components has been considered. In this interim report some preliminary results on magnetic force and ultrasonic evaluation of creep-fatigue damage in an LMFBR steam generator material are presented. These results indicate that the non-destructive evaluation of pure creep damage will be extremely difficult. A set of biaxial creep-fatigue tests that are designed to discriminate between various failure theories is also described

  4. Petroleum marketing monthly

    NONE

    1995-11-01

    The Petroleum Marketing Monthly (PMM) provides information and statistical data on a variety of crude oils and refined petroleum products. The publication presents statistics on crude oil costs and refined petroleum products sales for use by industry, government, private sector analysts, educational institutions, and consumers. Data on crude oil include the domestic first purchase price, the f.o.b. and landed cost of imported crude oil, and the refiners` acquisition cost of crude oil. Refined petroleum product sales data include motor gasoline, distillates, residuals, aviation fuels, kerosene, and propane. The Petroleum Marketing Division, Office of Oil and Gas, Energy Information Administration ensures the accuracy, quality, and confidentiality of the published data.

  5. Prognostic value of negative interim 2-["1"8F]-fluoro-2-deoxy-D-glucose PET/CT in diffuse large B-cell lymphoma

    Kwon, S.H.; Kang, D.R.; Kim, J.; Yoon, J.-K.; Lee, S.J.; Jeong, S.H.; Lee, H.W.; An, Y.-S.

    2016-01-01

    Aim: To assess the prognostic value of negative interim combined 2-["1"8F]-fluoro-2-deoxy-D-glucose ("1"8F-FDG) positron-emission tomography/computed tomography (PET/CT) in patients with diffuse large B-cell lymphoma (DLBCL). Materials and methods: Ninety-two patients with histologically proven DLBCL were enrolled. All of the patients underwent "1"8F-FDG PET/CT at diagnosis, and interim PET/CT after the second cycle of chemotherapy with rituximab, cyclophosphamide, hydroxydaunorubicin, vincristine, and prednisolone (R-CHOP). Negative interim PET/CT was defined as the disappearance of all abnormal "1"8F-FDG uptake compared to the pretreatment PET/CT image, as determined by visual assessment. The clinical outcome of patients was estimated as progression-free survival (PFS), and the prognostic significance of clinicopathological and imaging parameters were assessed using the Cox proportional hazards model. Results: Thirty-six patients (39.1%) showed lymphoma progression within a median follow-up of 30.8 months. According to univariate analysis, Ann Arbor stage, serum lactate dehydrogenase level, Eastern Cooperative Oncology Group scale, International Prognostic Index (IPI) score, and maximum standardised uptake values on initial PET/CT were significant prognostic factors for PFS (all p<0.05). Among these parameters, only the IPI score was an independent predictor for PFS (p=0.044). Survival of patients with a high IPI score (≥3) was poorer than those with a low IPI score (0–2; p<0.001). Conclusion: Despite a negative interim "1"8F-FDG PET/CT, approximately 39% of DLBCL patients showed progression during follow-up. Although the negative PET/CT was obtained during chemotherapy, it is important to closely follow-up patients, especially those with a high IPI score. - Highlights: • About 39% of patients showed progression after negative interim PET/CT. • The IPI score was an independent predictor for PFS. • It is important to closely follow-up with high IPI score

  6. Replacement of a hopeless maxillary central incisor: a technique for the fabrication of an immediate implant-supported interim restoration.

    Graiff, Lorenzo; Vigolo, Paolo

    2012-04-01

    Placement of a dental implant and an interim restoration in the esthetic zone immediately following tooth extraction is now a common procedure. However, in such clinical situations, the fabrication of an appropriate interim restoration may be challenging. The aim of this article is to present a technique for modifying the extracted tooth so it can be used as an implant-supported interim restoration.

  7. Fast Flux Test Facility interim examination and maintenance cell: Past, present, and future

    Vincent, J.R.

    1990-09-01

    The Fast Flux Test Facility Interim Examination and Maintenance Cell was designed to perform interim examination and/or disassembly of experimental core components for final analysis elsewhere, as well as maintenance of sodium-wetted or neutron-activated internal reactor parts and plant support hardware. The Interim Examination and Maintenance Cell equipment developed and used for the first ten years of operation has been primarily devoted to the disassembly and examination of core component test assemblies. While no major reactor equipment has required remote repair or maintenance, the Interim Examina Examination and Maintenance Cell has served as the remote repair facility for its own in-cell equipment, and several innovative remote repairs have been accomplished. The Interim Examination and Maintenance Cell's demonstrated versatility has shown its capability to support a challenging future. 12 refs., 9 figs

  8. Scale economies in a series of generic interim SNF storage facilities - 15104

    Rothwell, G.

    2015-01-01

    This paper describes a micro-economic, cost-engineering model of a centralized (Generic Interim Storage Facility - GISF) facility to monitor LWR irradiated fuel with particular attention to scale economies (e.g., to compare the likely costs at a power plant site or at regional, national and international facilities). This paper is based on the cost estimates of the Private Fuel Services Facility (PFSF) on the Skull Valley Band of Goshute Indians' Reservation in Utah, licensed by the US NRC in 2006 to centralize storage of 40.000 metric tons of heavy metal (MTHM) for 20 to 40 years. Assuming movement of the 40.000 MTHM every 40 years to a new facility, the levelized costs are 144 dollars/kg without high security and physical protection, and 208 dollars/kg with high security through 2111 (assuming disposal within a century), or about 0.50 dollars/MWh to 0.75 dollars/MWh depending on the burnup and thermal efficiency of the nuclear power plant. This cost estimate is generalized to explore scale economies for facilities with and without high security and physical protection. There are declining levelized costs with increasing size to 120.000 MTHM without high security, and to 500.000 MTHM with high security, i.e., the higher the level of security, the stronger the economies of scale. (author)

  9. Sampling and analysis plan for Wayne Interim Storage Site (WISS), Wayne, New Jersey

    Brown, K.S.; Murray, M.E.; Rodriguez, R.E.

    1998-10-01

    This field sampling plan describes the methodology to perform an independent radiological verification survey and chemical characterization of a remediated area of the subpile at the Wayne Interim Storage Site, Wayne, New Jersey.Data obtained from collection and analysis of systematic and biased soil samples will be used to assess the status of remediation at the site and verify the final radiological status. The objective of this plan is to describe the methods for obtaining sufficient and valid measurements and analytical data to supplement and verify a radiological profile already established by the Project Remediation Management Contractor (PMC). The plan describes the procedure for obtaining sufficient and valid analytical data on soil samples following remediation of the first layer of the subpile. Samples will be taken from an area of the subpile measuring approximately 30 m by 80 m from which soil has been excavated to a depth of approximately 20 feet to confirm that the soil beneath the excavated area does not exceed radiological guidelines established for the site or chemical regulatory limits for inorganic metals. After the WISS has been fully remediated, the Department of Energy will release it for industrial/commercial land use in accordance with the Record of Decision. This plan provides supplemental instructions to guidelines and procedures established for sampling and analysis activities. Procedures will be referenced throughout this plan as applicable, and are available for review if necessary

  10. Colonie Interim Storage Site environmental report for calendar year 1992, 1130 Central Avenue, Colonie, New York

    1993-05-01

    This report describes the environmental surveillance program at the Colonie Interim Storage Site (CISS) and provides the results for 1992. The site is located in eastern New York State, approximately 6.4 km (4.0 mi) northwest of downtown Albany. From 1958 to 1984, National Lead (NL) Industries used the facility to manufacture various components from depleted and enriched uranium natural thorium. Environmental monitoring of CISS began in 1984 when Congress added, the site to the US Department of Energy's (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a program established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental surveillance program at CISS includes sampling networks for external gamma radiation exposure and for thorium-232 and total uranium concentrations in surface water, sediment, and groundwater. Several chemical parameters are also measured in groundwater, including total metals, volatile organics, and water quality parameters. This surveillance program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results are compared with applicable Environmental Protection Agency (EPA) and New York State Department of Environmental Conservation (NYSDEC) standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements

  11. Advantages on dry interim storage for spent nuclear fuel

    Romanato, L.S. [Centro Tecnologico da Marinha em Sao Paulo, Av. Professor Lineu Prestes 2468, 05508-900 Sao Paulo (Brazil); Rzyski, B.M. [IPEN/ CNEN-SP, 05508-000 Sao Paulo (Brazil)]. e-mail: romanato@ctmsp.mar.mil.br

    2006-07-01

    When the nuclear fuel lose its ability to efficiently create energy it is removed from the core reactor and moved to a storage unit waiting for a final destination. Generally, the spent nuclear fuel (SNF) remains inside concrete basins with water within the reactors facility for the radioactive activity decay. Water cools the generated heat and shields radioactivity emissions. After some period of time in water basins the SNF can be sent to a definitive deposition in a geological repository and handled as radioactive waste or to reprocessing installations, or still wait for a future solution. Meanwhile, SNF remains stored for a period of time in dry or wet installations, depending on the method adopted by the nuclear power plant or other plans of the country. In many SNF wet storage sites the capacity can be fulfilled very quickly. If so, additional area or other alternative storage system should be given. There are many options to provide capacity increase in the wet storage area, but dry storages are worldwide preferred since it reduces corrosion concerns. In the wet storage the temperature and water purity should be constantly controlled whereas in the dry storage the SNF stands protected in specially designed canisters. Dry interim storages are practical and approved in many countries especially that have the 'wait and see' philosophy (wait to see new technologies development). This paper shows the advantages of dry interim storages sites in comparison with the wet ones and the nowadays problems as terrorism. (Author)

  12. Climate change : we are at risk : interim report

    Oliver, D.; Wiebe, J.

    2003-06-01

    Between November 2002 and May 2003 the Standing Senate Committee on Agriculture and Forestry travelled across Canada to hear the views of farmer organizations, rural associations, ecotourism groups and environmental organizations regarding concerns about climate change and the impact it may have on the agriculture and forestry sectors and rural communities. The Committee also examined potential adaptation strategies focusing on primary production, practices, technologies, ecosystems and other related areas. Farmers and forest operators are already facing changes in market conditions, domestic regulations, trade policies and technology. This interim report expressed the concerns of farmers and forest operators. It includes a review of the Saguenay flood of 1996, the Red River flood of 1997, the ice storm of 1998, and droughts since 1999. It also includes a discussion on climate change and its biophysical and economic effects on agriculture, forestry, water resources, rural communities, and Aboriginal communities. This interim report also briefly outlines the Kyoto Protocol, the emissions trading system, and the decarbonization of global energy systems. It emphasized the need for integrated research and government policies and programs that encourage adaptation to climate change. The final report will be released in October 2003 and will provide specific recommendations to ensure that Canada responds to the concerns of farmers and forest operators and to ensure continued prosperity in these sectors. refs., figs

  13. Nuclear waste: Is there a need for federal interim storage

    1989-01-01

    The Congress created the Monitored Retrievable Storage Review Commission to provide a report on the need for a Federal monitored retrievable storage facility (MRS) as part of the Nation's nuclear waste management system. The Commission concludes that the MRS as presently described in the law, which links the capacity and schedule of operation of the MRS to a permanent geologic repository, cannot be justified. The Commission finds, however, that while no single factor would favor an MRS over the No-MRS option, cumulatively the advantages of an MRS would justify the building of an MRS if: there were no linkages between the MRS and the repository; the MRS could be constructed at an early date; and the opening of the repository were delayed considerably beyond its presently scheduled date of operation. The Commission therefore recommends that the Congress take the following actions: Authorize construction of a Federal Emergency Storage facility with a capacity limit of 2,000 metric tons of uranium; Authorize construction of a User-Funded Interim Storage facility with a capacity limit of 5,000 metric tons of uranium; Reconsider the subject of interim storage by the year 2000

  14. Glass packages in interim storage; Les verres dans les stockages

    Jacquet-Francillon, N

    1994-10-01

    This report summarize the current state of knowledge concerning the behavior of type C waste packages consisting of vitrified high-level solutions produced by reprocessing spent fuel. The composition and the physical and chemical properties of the feed solutions are reviewed, and the vitrification process is described. Sodium alumino-borosilicate glass compositions are generally employed - the glass used at la Hague for LWR fuel solutions, for example, contains 45 % SiO{sub 2}. The major physical, chemical, mechanical and thermal properties of the glass are reviewed. In order to allow their thermal power to diminish, the 3630 glass packages produced (as of January 1993) in the vitrification facilities at Marcoule and La Hague are placed in interim storage for several decades. The actual interim storage period has not been defined, as it is closely related to the concept and organization selected for the final destination of the packages: a geological repository. The glass behavior under irradiation is described. Considerable basic and applied research has been conducted to assess the aqueous leaching behavior of nuclear containment glass. The effects of various repository parameters (temperature, flow rate, nature of the environmental materials) have been investigated. The experimental findings have been used to specify a model describing the kinetics of aqueous corrosion of the glass. More generally all the ``source term`` models developed in France by the CEA or by ANDRA are summarized. (author). 152 refs., 33 figs.

  15. Safety of Long-term Interim Storage Facilities - Workshop Proceedings

    2014-01-01

    The objective of this workshop was to discuss and review current national activities, plans and regulatory approaches for the safety of long term interim storage facilities dedicated to spent nuclear fuel (SF), high level waste (HLW) and other radioactive materials with prolonged storage regimes. It was also intended to discuss results of experiments and to identify necessary R and D to confirm safety of fuel and cask during the long-term storage. Safety authorities and their Technical Support Organisation (TSO), Fuel Cycle Facilities (FCF) operating organisations and international organisations were invited to share information on their approaches, practices and current developments. The workshop was organised in an opening session, three technical sessions, and a conclusion session. The technical sessions were focused on: - National approaches for long term interim storage facilities; - Safety requirements, regulatory framework and implementation issues; - Technical issues and operational experience, needs for R and D. Each session consisted of a number of presentations followed by a panel discussion moderated by the session Chairs. A summary of each session and subsequent discussion that ensued are provided as well as a summary of the results of the workshop with the text of the papers given and presentations made

  16. Advantages on dry interim storage for spent nuclear fuel

    Romanato, L.S.; Rzyski, B.M.

    2006-01-01

    When the nuclear fuel lose its ability to efficiently create energy it is removed from the core reactor and moved to a storage unit waiting for a final destination. Generally, the spent nuclear fuel (SNF) remains inside concrete basins with water within the reactors facility for the radioactive activity decay. Water cools the generated heat and shields radioactivity emissions. After some period of time in water basins the SNF can be sent to a definitive deposition in a geological repository and handled as radioactive waste or to reprocessing installations, or still wait for a future solution. Meanwhile, SNF remains stored for a period of time in dry or wet installations, depending on the method adopted by the nuclear power plant or other plans of the country. In many SNF wet storage sites the capacity can be fulfilled very quickly. If so, additional area or other alternative storage system should be given. There are many options to provide capacity increase in the wet storage area, but dry storages are worldwide preferred since it reduces corrosion concerns. In the wet storage the temperature and water purity should be constantly controlled whereas in the dry storage the SNF stands protected in specially designed canisters. Dry interim storages are practical and approved in many countries especially that have the 'wait and see' philosophy (wait to see new technologies development). This paper shows the advantages of dry interim storages sites in comparison with the wet ones and the nowadays problems as terrorism. (Author)

  17. Interim sanitary landfill groundwater monitoring report. 1996 Annual report

    Bagwell, L.A.

    1997-01-01

    Eight wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Interim Sanitary Landfill at the Savannah River Site. These wells are sampled semiannually to comply with the South Carolina Department of Health and Environmental Control Modified Municipal Solid Waste Permit 025500-1120 and as part of the SRS Groundwater Monitoring Program. Trichlorofluoromethane and 1,1,1-trichloroethane were elevated in one sidegradient well and one downgradient well during 1996. Zinc was elevated in three downgradient wells and also was detected in the associated laboratory blanks for two of those wells. Specific conductance was elevated in one background well and one sidegradient well. Barium and copper exceeded standards in one sidegradient well, and dichloromethane (a common laboratory contaminant) was elevated in another sidegradient well. Barium, copper, and dichloromethane were detected in the associated blanks for these wells, also. The groundwater flow direction in the Steed Pond Acquifer (Water Table) beneath the Interim Sanitary Landfill was to the southeast (universal transverse Mercator coordinates). The flow rate in this unit was approximately 210 ft/year during first quarter 1996 and 180 ft/yr during third quarter 1996

  18. Climate change : we are at risk : interim report

    Oliver, D.; Wiebe, J.

    2003-06-01

    Between November 2002 and May 2003 the Standing Senate Committee on Agriculture and Forestry travelled across Canada to hear the views of farmer organizations, rural associations, ecotourism groups and environmental organizations regarding concerns about climate change and the impact it may have on the agriculture and forestry sectors and rural communities. The Committee also examined potential adaptation strategies focusing on primary production, practices, technologies, ecosystems and other related areas. Farmers and forest operators are already facing changes in market conditions, domestic regulations, trade policies and technology. This interim report expressed the concerns of farmers and forest operators. It includes a review of the Saguenay flood of 1996, the Red River flood of 1997, the ice storm of 1998, and droughts since 1999. It also includes a discussion on climate change and its biophysical and economic effects on agriculture, forestry, water resources, rural communities, and Aboriginal communities. This interim report also briefly outlines the Kyoto Protocol, the emissions trading system, and the decarbonization of global energy systems. It emphasized the need for integrated research and government policies and programs that encourage adaptation to climate change. The final report will be released in October 2003 and will provide specific recommendations to ensure that Canada responds to the concerns of farmers and forest operators and to ensure continued prosperity in these sectors. refs., figs.

  19. Safety aspects of long-term dry interim storage of Type B spent fuel and high-level transport casks

    Wolff, D.; Probst, U.; Voelzke, H.; Droste, B.; Roedel, R.

    2004-01-01

    Based on the German decision to minimise transport of spent fuel casks between nuclear power plants, reprocessing plants and central storage facilities several on-site storage facilities were licensed until the end of 2003. Because of the large amount of Type B(U) transport casks which are going to be used for long-term interim storage the question of time-limited Type B(U) licence maintenance during the storage period of up to 40 years has been discussed under different aspects. This paper describes present technical aspects of the discussion. A main aspect of qualification of transport casks for interim storage is the long-term behaviour of the metallic seal-lid system. Here we present results from current long-term experimental tests with metallic 'Helicoflex' seals in which pool water is enclosed. This series of tests has been performed by the Federal Institute for Materials Research and Testing (BAM) on behalf of the Federal Office for Radiation Protection (BfS) since 2001. Finally, the paper presents a German concept for an exchange of experience, know-how and state-of-the-art between authorities and technical experts with regard to cask dispatch in nuclear facilities. BAM has taken over a central role in this so-called 'coordinating institution for cask dispatching information' ('KOBAF') which entails management of an online database of cask-specific documents and a technical working group meeting twice a year. The goal is to keep comparable technical standards for all nuclear sites and storage facilities which are going to load and dispatch casks of the same or similar types under the responsibility of different German state governments for the coming decades. (author)

  20. Safety aspects of long-term dry interim storage of type-B spent fuel and HLW transport casks

    Wolff, D.; Probst, U.; Voelzke, H.; Droste, B.; Roedel, R.

    2004-01-01

    Based on the German decision to minimise transports of spent fuel casks between nuclear power plants, reprocessing plants and central storage facilities several on-site storage facilities have been licensed till the end of 2003. Because of the large amount of type-B transport casks which are going to be used for long-term interim storage the question of time limited type-B license maintenance during the storage period of up to 40 years has been discussed under different aspects. This paper describes present technical aspects of the discussion. A main aspect of transport cask qualification for interim storage is the long-term behaviour of the metallic seal lid system. Concerning this results from current experimental long-term tests with metallic ''Helicoflex''-seals in which pool water is enclosed are presented. The test series has been performed by the Federal Institute for Materials Research and Testing (BAM) on behalf of the Federal Office for Radiation Protection (BfS) since 2001. Finally, the paper presents a German concept for an authorities' and technical experts' exchange of experience, know-how and state of the art referring to cask dispatch in nuclear facilities. BAM has taken over a central role in this so-called ''co-ordinating institution for cask dispatching information'' (''KOBAF'') which contains an online data base and a technical working group meeting twice a year. The goal is to keep comparable technical standards for all nuclear sites and storage facilities which are going to load and dispatch casks of the same or similar types under the responsibility of different German state governments for the next decades

  1. Benchmarking monthly homogenization algorithms

    Venema, V. K. C.; Mestre, O.; Aguilar, E.; Auer, I.; Guijarro, J. A.; Domonkos, P.; Vertacnik, G.; Szentimrey, T.; Stepanek, P.; Zahradnicek, P.; Viarre, J.; Müller-Westermeier, G.; Lakatos, M.; Williams, C. N.; Menne, M.; Lindau, R.; Rasol, D.; Rustemeier, E.; Kolokythas, K.; Marinova, T.; Andresen, L.; Acquaotta, F.; Fratianni, S.; Cheval, S.; Klancar, M.; Brunetti, M.; Gruber, C.; Prohom Duran, M.; Likso, T.; Esteban, P.; Brandsma, T.

    2011-08-01

    The COST (European Cooperation in Science and Technology) Action ES0601: Advances in homogenization methods of climate series: an integrated approach (HOME) has executed a blind intercomparison and validation study for monthly homogenization algorithms. Time series of monthly temperature and precipitation were evaluated because of their importance for climate studies and because they represent two important types of statistics (additive and multiplicative). The algorithms were validated against a realistic benchmark dataset. The benchmark contains real inhomogeneous data as well as simulated data with inserted inhomogeneities. Random break-type inhomogeneities were added to the simulated datasets modeled as a Poisson process with normally distributed breakpoint sizes. To approximate real world conditions, breaks were introduced that occur simultaneously in multiple station series within a simulated network of station data. The simulated time series also contained outliers, missing data periods and local station trends. Further, a stochastic nonlinear global (network-wide) trend was added. Participants provided 25 separate homogenized contributions as part of the blind study as well as 22 additional solutions submitted after the details of the imposed inhomogeneities were revealed. These homogenized datasets were assessed by a number of performance metrics including (i) the centered root mean square error relative to the true homogeneous value at various averaging scales, (ii) the error in linear trend estimates and (iii) traditional contingency skill scores. The metrics were computed both using the individual station series as well as the network average regional series. The performance of the contributions depends significantly on the error metric considered. Contingency scores by themselves are not very informative. Although relative homogenization algorithms typically improve the homogeneity of temperature data, only the best ones improve precipitation data

  2. Interim FEP report for the safety assessment SR-Can

    Skagius, Kristina (ed.) [Kemakta Konsult AB, Stockholm (Sweden)

    2004-08-01

    This report describes the work with identification and structuring of features, events and processes (FEPs) that has been carried out within the scope of the SR-Can safety assessment up to the time of the interim reporting of the project. The overall objective of the work is to develop a database of features, events and processes in a format that would facilitate both a systematic analysis of FEPs and documentation of the FEP analysis as well as facilitate revisions and updates to be made in connection with new safety assessments. This overall objective also includes the development of procedures for a systematic FEP analysis as well as to apply these procedures in order to arrive at an SR-Can version of the FEP database. The work started by implementing the content of the SR 97 Process report into a database format suitable for import and processing of FEP information from other sources. The SR 97 version of the database was systematically audited against the NEA database with Project FEPs, version 1.2. In addition, an earlier audit of the SR 97 process report against the interaction matrices developed for a deep repository of the KBS-3 type was revisited and updated. Relevant FEPs from the audit were sorted into three main categories in the SR-Can database i) FEPs related to the initial states of the repository system, ii) FEPs related to internal processes of the repository system, and iii) FEPs related to external impacts on the repository system. These groups of FEPs were further processed for making decisions on how to handle these FEPs in the assessment. Biosphere processes were not included in the SR 97 Process report and there is thus not the same basis for updating these descriptions as for the engineered barriers and the geosphere. All biosphere FEPs from the audit have therefore been compiled in a single category in the database, but remain to be further handled. FEPs were also categorised as irrelevant or as being related to methodology on a general

  3. Interim FEP report for the safety assessment SR-Can

    Skagius, Kristina

    2004-08-01

    This report describes the work with identification and structuring of features, events and processes (FEPs) that has been carried out within the scope of the SR-Can safety assessment up to the time of the interim reporting of the project. The overall objective of the work is to develop a database of features, events and processes in a format that would facilitate both a systematic analysis of FEPs and documentation of the FEP analysis as well as facilitate revisions and updates to be made in connection with new safety assessments. This overall objective also includes the development of procedures for a systematic FEP analysis as well as to apply these procedures in order to arrive at an SR-Can version of the FEP database. The work started by implementing the content of the SR 97 Process report into a database format suitable for import and processing of FEP information from other sources. The SR 97 version of the database was systematically audited against the NEA database with Project FEPs, version 1.2. In addition, an earlier audit of the SR 97 process report against the interaction matrices developed for a deep repository of the KBS-3 type was revisited and updated. Relevant FEPs from the audit were sorted into three main categories in the SR-Can database i) FEPs related to the initial states of the repository system, ii) FEPs related to internal processes of the repository system, and iii) FEPs related to external impacts on the repository system. These groups of FEPs were further processed for making decisions on how to handle these FEPs in the assessment. Biosphere processes were not included in the SR 97 Process report and there is thus not the same basis for updating these descriptions as for the engineered barriers and the geosphere. All biosphere FEPs from the audit have therefore been compiled in a single category in the database, but remain to be further handled. FEPs were also categorised as irrelevant or as being related to methodology on a general

  4. Petroleum Supply Monthly

    NONE

    1996-02-01

    The Petroleum Supply Monthly (PSM) is one of a family of four publications produced by the Petroleum Supply Division within the Energy Information Administration (EIA) reflecting different levels of data timeliness and completeness. The other publications are the Weekly Petroleum Status Report (WPSR), the Winter Fuels Report, and the Petroleum Supply Annual (PSA). Data presented in the PSM describe the supply and disposition of petroleum products in the United States and major U.S. geographic regions. The data series describe production, imports and exports, inter-Petroleum Administration for Defense (PAD) District movements, and inventories by the primary suppliers of petroleum products in the United States (50 States and the District of Columbia). The reporting universe includes those petroleum sectors in primary supply. Included are: petroleum refiners, motor gasoline blenders, operators of natural gas processing plants and fractionators, inter-PAD transporters, importers, and major inventory holders of petroleum products and crude oil. When aggregated, the data reported by these sectors approximately represent the consumption of petroleum products in the United States. Data presented in the PSM are divided into two sections: Summary Statistics and Detailed Statistics.

  5. Petroleum supply monthly

    NONE

    1995-10-01

    The Petroleum Supply Monthly (PSM) is one of a family of four publications produced by the Petroleum Supply Division within the Energy Information Administration (EIA) reflecting different levels of data timeliness and completeness. The other publications are the Weekly Petroleum Status Report (WPSR), the Winter Fuels Report, and the Petroleum Supply Annual (PSA). Data presented in the PSM describe the supply and disposition of petroleum products in the United States and major US geographic regions. The data series describe production, imports and exports, inter-Petroleum Administration for Defense (PAD) District movements, and inventories by the primary suppliers of petroleum products in the United States (50 States and the District of Columbia). The reporting universe includes those petroleum sectors in primary supply. Included are: petroleum refiners, motor gasoline blends, operators of natural gas processing plants and fractionators, inter-PAD transporters, importers, and major inventory holders of petroleum products and crude oil. When aggregated, the data reported by these sectors approximately represent the consumption of petroleum products in the United States.

  6. Metal-metal-hofteproteser

    Ulrich, Michael; Overgaard, Søren; Penny, Jeannette

    2014-01-01

    In Denmark 4,456 metal-on-metal (MoM) hip prostheses have been implanted. Evidence demonstrates that some patients develope adverse biological reactions causing failures of MoM hip arthroplasty. Some reactions might be systemic. Failure rates are associated with the type and the design of the Mo...

  7. Effect of lymphedema treatment. The interim report of prospective study at multiple facilities

    Hamamoto, Takako; Ogata, Minako; Satoh, Kayoko; Ashino, Yoshikazu

    2009-01-01

    We are in the process of analyzing the effect of complex physical therapy (CPT) for the patients of secondary lymphedema associated with cancer treatment. At this time, we present an interim report of the past 3 months started in March 2009. We classified the lymphedema stage into four stages based on the International Society of Lymphology criterion using the imaging diagnosis (ultrasonography (US), CT, etc.) in addition to a conventional observation. We also classified the CPT treatment period into two in accordance with water retention in the subcutaneous adipose tissue of the limbs. CPT was performed by the specialist of lymphedema treatment. We used the change in volume of limbs and quality of life (QOL) evaluation by SF-36 and Skindex29 for analysis. On this report, the volume of limbs, which has lymphedema and an improvement on SF-36, did not change significantly. This may have been resulted from not having enough follow-up period and lack of few cases at each stage in the analysis. However, we confirmed that the general and emotion evaluation on Skindex29 showed a meaningful change. We are still planning to accumulate more cases and study them for further detailed analysis. (author)

  8. Improving of spent fuel monitoring in condition of Slovak wet interim spent fuel storage facility

    Miklos, M.; Krsjak, V.; Bozik, M.; Vasina, D.

    2008-01-01

    Monitoring of WWER fuel assemblies condition in Slovakia is presented in the paper. The leak tightness results of fuel assemblies used in Slovak WWER units in last 20 years are analyzed. Good experiences with the 'Sipping system' are described. The Slovak wet interim spent fuel storage facility in NPP Jaslovske Bohunice was build and put in operation in 1986. Since 1999, leak tests of WWER-440 fuel assemblies are provided by special leak tightness detection system 'Sipping in Pool' delivered by Framatome-ANP facility with external heating for the precise detection of active specimens. Another system for monitoring of fuel assemblies condition was implemented in December 2006 under the name 'SVYPP-440'. First non-active tests started at February 2007 and are described in the paper. Although those systems seems to be very effective, the detection time of all fuel assemblies in one storage pool is too long (several months). Therefore, a new 'on-line' detection system, based on new sorbent KNiFC-PAN for effective 134 Cs and 137 Cs activity was developed. This sorbent was compared with another type of sorbent NIFSIL and results are presented. The design of this detection system and its possible application in the Slovak wet spent fuel storage facility is discussed. For completeness, the initial results of the new system are also presented. (authors)

  9. Interim Report of the Commission to Review the Effectiveness of the National Energy Laboratories

    Cohon, Jared L. [Carnegie Mellon Univ., Pittsburgh, PA (United States); Glauthier, T. J. [TJG Energy Associates, LLC., Bloomberg, VA (United States); Augustine, Norman R. [U.S. Dept. of Homeland Security, Washington, DC (United States); Austin, Wanda M. [Aerospace Corporation, El Segundo, CA (United States); Elachi, Charles [California Inst. of Technology (CalTech), Pasadena, CA (United States); Fleury, Paul A. [Yale Univ., New Haven, CT (United States); Hockfield, Susan J. [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States); Meserve, Richard A. [Covington and Burling LLP, Washington, DC (United States); Murray, Cherry A. [Harvard Univ., Cambridge, MA (United States)

    2015-02-27

    The Commission to Review the Effectiveness of the National Energy Laboratories was charged by Congress in January 2014 to evaluate the mission, capabilities, size, performance, governance, and agency oversight of the 17 Department of Energy (DOE) laboratories. Given the incredibly broad scope and aggressive timeline (the original deadline was February 2015), the Secretary of Energy and Congress agreed to split the task into two phases. This interim report contains the preliminary observations and recommendations gleaned from Phase 1 of the study, which consisted of a literature review; visits to five of the National Laboratories; semi-structured interviews with staff from across the National Laboratories, DOE, other Federal agencies, companies, other non-governmental organizations, and additional interested parties; and presentations at monthly public Commission meetings. The Commission notes that the purpose of the National Laboratories is to provide critical capabilities and facilities in service of DOE’s mission and the needs of the broader national and international science and technology (S&T) community, including other Federal agencies, academia, and private industry. The National Laboratories are successfully fulfilling that mission today. While the Commission believes significant improvements can be made to many aspects of DOE management and governance of the laboratories, those issues do not detract from the National Laboratories’ remarkable contributions to the American public. In Phase 2 the Commission will focus on ways to make the process of carrying out their missions more efficient and effective.

  10. A conservative method of retaining an interim obturator for a total maxillectomy patient

    Nirmal Famila Bettie

    2017-01-01

    Full Text Available Interim obturators are indicated during the postsurgical phases. It promotes surgical healing and serves as a temporary prosthesis to rehabilitate a patient with intra-oral surgical defect. Retention is gained by wiring, surgical suturing, and other noninvasive methods to enable functional rehabilitation and easy replacement with a permanent obturator. Interim obturators serve as an easy guide for replacing with definitive obturators by indicating prosthesis extensions and the required method of retention. A more conservative and noninvasive method of retaining an interim obturator for a maxillectomy patient is described in this case report.

  11. A Conservative Method of Retaining an Interim Obturator for a Total Maxillectomy Patient.

    Bettie, Nirmal Famila

    2017-11-01

    Interim obturators are indicated during the postsurgical phases. It promotes surgical healing and serves as a temporary prosthesis to rehabilitate a patient with intra-oral surgical defect. Retention is gained by wiring, surgical suturing, and other noninvasive methods to enable functional rehabilitation and easy replacement with a permanent obturator. Interim obturators serve as an easy guide for replacing with definitive obturators by indicating prosthesis extensions and the required method of retention. A more conservative and noninvasive method of retaining an interim obturator for a maxillectomy patient is described in this case report.

  12. Project management plan for Reactor 105-C Interim Safe Storage project

    Plagge, H.A.

    1996-09-01

    Reactor 105-C (located on the Hanford Site in Richland, Washington) will be placed into an interim safe storage condition such that (1) interim inspection can be limited to a 5-year frequency; (2) containment ensures that releases to the environmental are not credible under design basis conditions; and (3) final safe storage configuration shall not preclude or significantly increase the cost for any decommissioning alternatives for the reactor assembly.This project management plan establishes plans, organizational responsibilities, control systems, and procedures for managing the execution of Reactor 105-C interim safe storage activities to meet programmatic requirements within authorized funding and approved schedules

  13. International validation study for interim PET in ABVD-treated, advanced-stage hodgkin lymphoma

    Biggi, Alberto; Gallamini, Andrea; Chauvie, Stephane

    2013-01-01

    At present, there are no standard criteria that have been validated for interim PET reporting in lymphoma. In 2009, an international workshop attended by hematologists and nuclear medicine experts in Deauville, France, proposed to develop simple and reproducible rules for interim PET reporting...... in lymphoma. Accordingly, an international validation study was undertaken with the primary aim of validating the prognostic role of interim PET using the Deauville 5-point score to evaluate images and with the secondary aim of measuring concordance rates among reviewers using the same 5-point score...

  14. Use of alternative dispute resolution--HHS. Notice of interim policy.

    1992-10-27

    The Department has developed an interim policy to address the use of alternative dispute resolution (ADR) as required by the Administrative Dispute Resolution Act (ADR Act), Public Law No. 101-552. This interim policy also responds to the Negotiated Rulemaking Act, Public Law No. 101-648, and relevant elements of the Executive Order on Civil Justice Reform (E.O. 12778). The Department is adopting an interim policy because we need a baseline of experience and knowledge from our own pilot activities and those of other agencies before finalizing a policy.

  15. Metallated metal-organic frameworks

    Bury, Wojciech; Farha, Omar K.; Hupp, Joseph T.; Mondloch, Joseph E.

    2017-08-22

    Porous metal-organic frameworks (MOFs) and metallated porous MOFs are provided. Also provided are methods of metallating porous MOFs using atomic layer deposition and methods of using the metallated MOFs as catalysts and in remediation applications.

  16. Interim report - geotechnical site assessment methodology. Vol.1

    Tunbridge, L.W.; Richards, L.R.

    1983-05-01

    An interim report summarizing the research conducted on geotechnical site assessment methodology at the Carwynnen test mine in Cornwall. The geological setting of the test site in the Cornubian granite batholith is described. The effect of structure imposed by discontinuities on the engineering behaviour of rock masses is discussed and the scanline survey method of obtaining data on discontinuities in the rock mass is described. The requirement for remote geophysical methods of characterizing the mass is discussed and initial experiments using seismic and ultrasonic velocity measurements are reported. Computer programs to perform statistical analysis of the discontinuity patterns are described. Overcoring and hydraulic fracturing methods of determining the in-situ stress are briefly described and the results of a programme of in-situ stress measurements using the overcoring method are reported. (author)

  17. Striking an interim balance of the ongoing climate debate

    Schoenwiese, C.D.

    1995-01-01

    After the Berlin UN conference of the signatory states to the Climate Change Convention it seems appropriate to strike an interim balance of the ongoing debate about the global climate change, as it has meanwhile evolved from an issue discussed among experts to an issue of public debate. Such a ''progress report'' seems to be opportune also because doubts are mounting in the face of proclaimed countermeasures. The article therefore reviews and summarizes facts and figures, discussing emissions and concentrations, the physical properties of greenhouse gases, as well as uncertainties of model calculations and of interpretations of measured data. The current situation calls for application of alternative models and concepts, and consideration of natural processes in competition with man-made impacts on the climate within the framework of optimized interpretation, in order to have probabilistic data at hand for decision-making. (orig.) [de

  18. Using optimization to improve radioactive waste interim storage

    Dellamano, J.C.; Sordi, G.M.

    2006-01-01

    In several countries where repository for final disposal is not constructed and in operation, the low level radioactive wastes are treated and stored. In some cases, interim storage can be extended for decades demanding special attention regarding security aspects. On the other hand, some packages contains very small quantities of radioactive material either by the long period of storage or by the rudimental segregation carried out when the radioactive waste were collected. This paper discuss the use of cost-benefit analysis as technique to aid decision making in order to evaluate the feasibility of to open the packages containing compactable solid radioactive wastes and to segregate these waste according to the classification that consider the recent clearance levels and exemption limits recommended by international organisms. (authors)

  19. Radiation analysis for a generic centralized interim storage facility

    Gillespie, S.G.; Lopez, P.; Eble, R.G.

    1997-01-01

    This paper documents the radiation analysis performed for the storage area of a generic Centralized Interim Storage Facility (CISF) for commercial spent nuclear fuel (SNF). The purpose of the analysis is to establish the CISF Protected Area and Restricted Area boundaries by modeling a representative SNF storage array, calculating the radiation dose at selected locations outside the storage area, and comparing the results with regulatory radiation dose limits. The particular challenge for this analysis is to adequately model a large (6000 cask) storage array with a reasonable amount of analysis time and effort. Previous analyses of SNF storage systems for Independent Spent Fuel Storage Installations at nuclear plant sites (for example in References 5.1 and 5.2) had only considered small arrays of storage casks. For such analyses, the dose contribution from each storage cask can be modeled individually. Since the large number of casks in the CISF storage array make such an approach unrealistic, a simplified model is required

  20. Advanced nuclear reactor public opinion project. Interim report

    Benson, B.

    1991-07-25

    This Interim Report summarizes the findings of our first twenty in-depth interviews in the Advanced Nuclear Reactor Public Opinion Project. We interviewed 6 industry trade association officials, 3 industry attorneys, 6 environmentalists/nuclear critics, 3 state officials, and 3 independent analysts. In addition, we have had numerous shorter discussions with various individuals concerned about nuclear power. The report is organized into the four categories proposed at our April, 1991, Advisory Group meeting: safety, cost-benefit analysis, science education, and communications. Within each category, some change of focus from that of the Advisory Group has been required, to reflect the findings of our interviews. This report limits itself to describing our findings. An accompanying memo draws some tentative conclusions.

  1. Centralized interim storage facility for radioactive wastes at Wuerenlingen (ZWILAG)

    Lutz, H.R.; Schnetzler, U.

    1994-01-01

    Radioactive waste management in Switzerland is the responsibility of the waste producers; in this respect, the law requires permanent, safe management of the wastes by means of final disposal. Nagra is responsible for the research and development work associated with final disposal. Processing of the wastes into a form suitable for disposal, as well as interim storage, remain the responsibility of the waste producers. In order to supplement the existing conditioning and storage facilities at the nuclear power plants and to replace the outdated waste treatment plant at the Paul Scherrer Institute (PSI) at Wuerenlingen, the operators of the Swiss nuclear power plants are planning a joint treatment and storage facility at the PSI-East site. The organisation ''Zwischenlager Wuerenlingen AG'', which was set up at the beginning of 1990, has been entrusted with this task. (author) 4 figs

  2. Waste resources utilization program. Interim report, June 30, 1976

    1976-07-01

    This is an interim report on the effects of the combined use of heat and ionizing radiation (thermoradiation) as a treatment for ridding sewage sludge of pathogenic organisms as well as its effect on the physical-chemical properties. This activity couples two major environmental problems, disposition of human and of nuclear waste, in an attempt to provide a framework in which both will become useful resources. This combined treatment might be chosen to inactivate both heat labile (but possibly radiation resistant) and radiation labile (but possibly heat resistant) organisms. The cost-effective analyses of such a treatment are being examined. Sludge treated with thermoradiation offers considerable potential for use as a fertilizer in agriculture or a soil conditioner for land reclamation free of the potential health hazards associated with conventional methods of land disposal. Treated sludge may also provide a low-cost substitute for high-nutritional components in ruminant diets

  3. Integrated system of safety features for spent fuel interim storage

    Pantazi, Doina; Stanciu, Marcela; Mateescu, Silvia; Marin, Ion

    1999-01-01

    The design of the spent fuel interim storage facility (SFISF) must meet the applicable safety requirements in order to ensure radiological protection of the personnel, public and environment during all phases of the facility. To elaborate the safety documentation necessary for licensing, we were trying to chose the most appropriate approach related to safety features for SFISF, based on national and international regulations, standards and recommendations, as well as on the experience of other countries with similar facilities and finally, on our own experience in designing other nuclear objectives in Romania. The paper presents the issues that we consider important for the safety evaluation and are developed as a detailed diagram. The diagram contains in a logical succession the following issues: - fundamental principles of radioprotection; - fundamental safety principles of radioactive waste management; - safety objectives of SFISF; - safety criteria for SFISF; - safety requirements for SFISF; - siting criteria for SFISF; - siting requirements for SFISF. (authors)

  4. Savannah River Interim Waste Management Program Plan - FY 1986

    1985-09-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1986. In addition, the document projects activities for several years beyond 1986 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of May 1985

  5. Modernization and refurbishment of the Central Interim Storage

    Mele, I.; Zeleznik, N.

    2002-01-01

    The Central Interim Storage for radioactive waste in Brinje, being put into operation in 1986, needs refurbishment and modernization in order to meet the up-to-date operational and safety requirements and to ensure the normal and undisturbed acceptance of radioactive waste from small producers in the future. Because of the waste, being already stored in the storage, the lack of reprocessing capacities and the lack of auxiliary room, the refurbishment and modernization is a complex problem, which needs to be addressed with care. The plan of refurbishment and modernization requires an integral approach, covering all different aspects of renewal and reconstruction. The implementation plan, however, must be based on the actual state of the storage and real conditions for the implementations: from technical to financial. In this paper the project for refurbishment and modernization of the storage, and some activities that have already been implemented, are presented.(author)

  6. Interim storage is not long-term disposal

    Vincenti, J.R.

    1994-01-01

    Starting in June 30, 1994 South Carolina enforced an embargo on regular shipments of low-level radioactive waste to the Barnwell repository. The failure of 31 states and their respective compacts to provide access to a long-term disposal facility as stipulated by the low-level radioactive Waste Policy Act of 1980 promotes waste disposal gridlock and anticipates another waste disposal crisis. This article discusses the problem using the following topics: Appalachian Compact Users of Radioactive Isotopes (ACURI) Association's interest; the problem of denial of access to Barnwell; pro and contra interim storage; vital services and benefits at risk; issues at the ACURI meeting; nobel Prize winners use radioactive materials; if perception is reality, politics is prevalent

  7. Savannah River Interim Waste Management Program plan, FY-1987

    1986-09-01

    This document provides the program plan as requested by the Savannah River Operations office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1987. In addition, the document projects activities for several years beyond 1987 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of June 1986

  8. Operator licensing examination standards for power reactors. Interim revision 8

    1997-01-01

    These examination standards are intended to assist NRC examiners and facility licensees to better understand the processes associated with initial and requalification examinations. The standards also ensure the equitable and consistent administration of examinations for all applicants. These standards are for guidance purposes and are not a substitute for the operator licensing regulations (i.e., 10 CFR Part 55), and they are subject to revision or other changes in internal operator licensing policy. This interim revision permits facility licensees to prepare their initial operator licensing examinations on a voluntary basis pending an amendment to 10 CFR Part 55 that will require facility participation. The NRC intends to solicit comments on this revision during the rulemaking process and to issue a final Revision 8 in conjunction with the final rule

  9. Waste Encapsulation and Storage Facility (WESF) Interim Status Closure Plan

    SIMMONS, F.M.

    2000-01-01

    This document describes the planned activities and performance standards for closing the Waste Encapsulation and Storage Facility (WESF). WESF is located within the 225B Facility in the 200 East Area on the Hanford Facility. Although this document is prepared based on Title 40 Code of Federal Regulations (CFR), Part 265, Subpart G requirements, closure of the storage unit will comply with Washington Administrative Code (WAC) 173-303-610 regulations pursuant to Section 5.3 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Action Plan (Ecology et al. 1996). Because the intention is to clean close WESF, postclosure activities are not applicable to this interim status closure plan. To clean close the storage unit, it will be demonstrated that dangerous waste has not been left onsite at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or environmentally is impracticable, the interim status closure plan will be modified to address required postclosure activities. WESF stores cesium and strontium encapsulated salts. The encapsulated salts are stored in the pool cells or process cells located within 225B Facility. The dangerous waste is contained within a double containment system to preclude spills to the environment. In the unlikely event that a waste spill does occur outside the capsules, operating methods and administrative controls require that waste spills be cleaned up promptly and completely, and a notation made in the operating record. Because dangerous waste does not include source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of this documentation. The information on radionuclides is provided only for general knowledge

  10. The challenges facing the long term interim storage

    Iracane, D. [CEA Sacaly, Dir. de la Simulation et des Outils Experimentaux-DSOE, 91 - Gif sur Yvette (France); Marvy, A. [CEA Saclay, Dir. du Developpement et de l' Innovation Nucleares-DDIN, 91 - Gif Sur Yvette (France)

    2001-07-01

    In France electricity generation by means of commercial nuclear power plants has come to a point where it contributes to the national demand at a level of 80%. The safety performance of the production system has also reached a high level of both maturity and reliability taking advantage of the cumulative effect of a 30 years long learning experience and ever more stringent safety requirements. The policy to reprocess spent fuel has been overriding but no final decision has yet been made regarding the ultimate disposition of the waste streams. Although studies on deep geological disposal are ongoing, France is also looking at whether and under which conditions a long-term interim storage may provide an effective flexibility to the fuel cycle back-end. We discuss thereafter the needs and the paramount objectives of this latter R and D program. Results are being framed as potential guiding criteria for decision makers and various stakeholders. In first part, we propose a general analysis which emphasises that a long term interim storage is more than a classical nuclear facility because it explicitly requires long-lasting control and creates a burden for Society during many generations. Then, in second part, we offer an overview of the technical results from the R and D program as they stand at the time of writing. As an answer to the Government request, a strong emphasis has been put on this research for three years. Conclusion is an attempt to outline the societal context in which future decisions will have to be made. (author)

  11. T Tank Farm Interim Cover Test - Design Plan

    Zhang, Z. F.; Keller, Jason M.

    2006-01-01

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank in 1973. Many of the contaminants from that leak still reside within the vadose zone beneath the T Tank Farm. CH2M Hill Hanford Group, Inc. seeks to minimize movement of this residual contaminant plume by placing an interim cover on the surface. Such a cover is expected to prevent infiltrating water from reaching the plume and moving it further. Pacific Northwest National Laboratory has prepared a design plan to monitor and determine the effectiveness of the interim cover. A three-dimensional numerical simulation of water movement beneath a cover was conducted to guide the design of the plan. Soil water content, water pressure, and temperature will be monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. In fiscal year 2006, two instrument nests will be installed, one inside and one outside of the proposed cover. In fiscal year 2007, two additional instrument nests, both inside the proposed cover, will be installed. Each instrument nest contains a neutron access tube and a capacitance probe (to measure water content), and four heat-dissipation units (to measure pressure head and temperature). A datalogger and a meteorological station will be installed outside of the fence. Two drain gauges will be installed in locations inside and outside the cover for the purpose of measuring soil water flux.

  12. The challenges facing the long term interim storage

    Iracane, D.; Marvy, A.

    2001-01-01

    In France electricity generation by means of commercial nuclear power plants has come to a point where it contributes to the national demand at a level of 80%. The safety performance of the production system has also reached a high level of both maturity and reliability taking advantage of the cumulative effect of a 30 years long learning experience and ever more stringent safety requirements. The policy to reprocess spent fuel has been overriding but no final decision has yet been made regarding the ultimate disposition of the waste streams. Although studies on deep geological disposal are ongoing, France is also looking at whether and under which conditions a long-term interim storage may provide an effective flexibility to the fuel cycle back-end. We discuss thereafter the needs and the paramount objectives of this latter R and D program. Results are being framed as potential guiding criteria for decision makers and various stakeholders. In first part, we propose a general analysis which emphasises that a long term interim storage is more than a classical nuclear facility because it explicitly requires long-lasting control and creates a burden for Society during many generations. Then, in second part, we offer an overview of the technical results from the R and D program as they stand at the time of writing. As an answer to the Government request, a strong emphasis has been put on this research for three years. Conclusion is an attempt to outline the societal context in which future decisions will have to be made. (author)

  13. Engineering study: disposition of terminal liquors for interim storage

    Metz, W.P.; Ogren, W.E.

    1975-02-01

    Eight alternative processes were chosen as being technologically feasible within the time frame dictated by budgeting procedures and terminal liquor availability. Solidified waste products acceptable for single-shell tank storage were assumed to be placed in available single-shell tanks. Double-shell tanks were used only for the more mobile terminal liquors or semi-solid mush products. The mush, chemical neutralization, and clay in-tank processes offer potential savings of tens of millions of dollars over double-shell tank storage of terminal liquors. In order to achieve this cost savings, the process development and demonstration must be completed prior to the beginning of double-shell tank construction (Dec. 1976) expected to be funded from a fiscal year 1977 line item. Budgeting for these additional double-shell tanks must proceed since the processing options discussed here are not yet available and may not prove to be available at the required time. This study indicates the following topics for additional study: Process technology development to achieve interim storage of terminal liquor products receives the greatest emphasis as a means of reducing capital expenditures. Interim storage product criteria, waste inventory, and conversion to final form require definition to allow comparison of the alternatives for disposition of terminal liquors. The pseudotechnical nature of product acceptability criteria is important to the evaluation of the partial neutralization and aluminum removal alternatives. More accurate estimates of terminal liquor quantity and composition are required to give a sound technical basis for choosing the appropriate processing alternative. Retrieval and reprocessing operations may affect the comparisons presented by this study

  14. 1998 interim 242-A Evaporator tank system integrity assessment report

    Jensen, C.E.

    1998-07-02

    This Integrity Assessment Report (IAR) is prepared by Fluor Daniel Northwest (FDNW) under contract to Lockheed-Martin Hanford Company (LMHC) for Waste Management Hanford (WMH), the 242-A Evaporator (facility) operations contractor for Fluor Daniel Hanford, and the US Department of Energy, the system owner. The contract specifies that FDNW perform an interim (5 year) integrity assessment of the facility and prepare a written IAR in accordance with Washington Administrative Code (WAC) 173-303-640. The WAC 173-303 defines a treatment, storage, or disposal (TSD) facility tank system as the ``dangerous waste storage or treatment tank and its ancillary equipment and containment.`` This integrity assessment evaluates the two tank systems at the facility: the evaporator vessel, C-A-1 (also called the vapor-liquid separator), and the condensate collection tank, TK-C-100. This IAR evaluates the 242-A facility tank systems up to, but not including, the last valve or flanged connection inside the facility perimeter. The initial integrity assessment performed on the facility evaluated certain subsystems not directly in contact with dangerous waste, such as the steam condensate and used raw water subsystems, to provide technical information. These subsystems were not evaluated in this IAR. The last major upgrade to the facility was project B-534. The facility modifications, as a result of project B-534, were evaluated in the 1993 facility interim integrity assessment. Since that time, the following upgrades have occurred in the facility: installation of a process condensate recycle system, and installation of a package steam boiler to provide steam for the facility. The package boiler is not within the scope of the facility TSD.

  15. 1998 interim 242-A Evaporator tank system integrity assessment report

    Jensen, C.E.

    1998-01-01

    This Integrity Assessment Report (IAR) is prepared by Fluor Daniel Northwest (FDNW) under contract to Lockheed-Martin Hanford Company (LMHC) for Waste Management Hanford (WMH), the 242-A Evaporator (facility) operations contractor for Fluor Daniel Hanford, and the US Department of Energy, the system owner. The contract specifies that FDNW perform an interim (5 year) integrity assessment of the facility and prepare a written IAR in accordance with Washington Administrative Code (WAC) 173-303-640. The WAC 173-303 defines a treatment, storage, or disposal (TSD) facility tank system as the ''dangerous waste storage or treatment tank and its ancillary equipment and containment.'' This integrity assessment evaluates the two tank systems at the facility: the evaporator vessel, C-A-1 (also called the vapor-liquid separator), and the condensate collection tank, TK-C-100. This IAR evaluates the 242-A facility tank systems up to, but not including, the last valve or flanged connection inside the facility perimeter. The initial integrity assessment performed on the facility evaluated certain subsystems not directly in contact with dangerous waste, such as the steam condensate and used raw water subsystems, to provide technical information. These subsystems were not evaluated in this IAR. The last major upgrade to the facility was project B-534. The facility modifications, as a result of project B-534, were evaluated in the 1993 facility interim integrity assessment. Since that time, the following upgrades have occurred in the facility: installation of a process condensate recycle system, and installation of a package steam boiler to provide steam for the facility. The package boiler is not within the scope of the facility TSD

  16. Effects of highway deicing chemicals on shallow unconsolidated aquifers in Ohio, interim report, 1988-93

    Jones, A.L.; Sroka, B.N.

    1997-01-01

    Effects of the application of highway deicing chemicals during winter months on ground- water quality are being studied by the U.S. Geological Survey in cooperation with the Ohio Department of Transportation and the Federal Highway Administration. Eight sites throughout the State were selected along major undivided highways where drainage is by open ditches and ground-water flow is approximately perpendicular to the highway. At these sites, records of deicer application rates are being kept and apparent movement of deicing chemicals through shallow, unconsolidated aquifers is being monitored by means of periodic measurements of specific con ductance and concentrations of dissolved sodium, calcium, and chloride. The counties and corre sponding sections of state routes being monitored are the following: State Route (SR) 3 in Ashland County, SR 84 in Ashtabula County, SR 29 in Champaign County, SR 4 in Clark County, SR 2 in Lucas County, SR 104 in Pickaway County, SR 14 in Portage County, and SR 97 in Richland County. The study began in January 1988 with background data collection, extensive literature review, and site selection. This process, including drilling of wells at the eight selected sites, lasted 3 years. Routine ground-water sampling at 4- to 6-week intervals began in January 1991. A relatively new type of multilevel, passive flow ground-water sampling device was constructed and used. Other conditions monitored on a regular basis included ground-water level (monitored con tinuously), specific conductance, air and soil temperature, precipitation, chloride concentration in soil samples, ground conductivity, and deicing chemical application times and rates. For the interim reporting period, water samples were collected from January 1991 through September 1993. Evidence from water analysis, specific conductance measurements, and surface geophysical measurements indicates that four of the eight sites (Ashtabula County, Lucas County, Portage County, and Richland

  17. Spent fuel test - Climax: technical measurements. Interim report, Fiscal Year 1983

    Patrick, W.C.; Butkovich, T.R.; Carlson, R.C.

    1984-02-01

    The Spent Fuel Test - Climax (SFT-C) is located 420 m below surface in the Climax stock granite on the Nevada Test Site. The test is being conducted as part of the Nevada Nuclear Waste Storage Investigations. Eleven canisters of spent nuclear reactor fuel were emplaced, and six electrical simulators were energized April-May 1980. The spent-fuel canisters were retrieved and the thermal sources were de-energized in March-April 1983 when test data indicated that test objectives were met during the 3-year storage phase. The SFT-C operational objective of demonstrating the feasibility of packaging, transporting, storing, and retrieving highly radioactive fuel assemblies in a safe and reliable manner has been met. In addition to emplacement and retrieval operations, three exchanges of spent-fuel between the SFT-C and a surface storage facility, conducted during the storage phase, furthered this demonstration. Technical objectives of the test led to development of a technical measurements program, which is the subject of this and three previous interim reports. Geotechnical, seismological, and test status data have been recorded on a continuing basis for the 3-1/2 year duration of the test on more than 900 channels. Data acquisition from the test is now limited to instrumentation calibration and evaluation activities. Data now available for analysis are presented here. Highlights of activities this year include a campaign of in situ stress measurements, mineralogical and petrological studies of pretest core samples, microfracture analyses of laboratory irradiated cores, improved calculations of near-field heat transfer and thermomechanical response during the final months of heating as well as during a six-month cool-down period, metallurgical analyses of selected test components, and further development of the data acquisition and data management systems. 27 references, 68 figures, 10 tables

  18. Spent fuel test - Climax: technical measurements. Interim report, Fiscal Year 1983

    Patrick, W.C.; Butkovich, T.R.; Carlson, R.C.; Durham, W.B.; Ganow, H.C.; Hage, G.L.; Majer, E.L.; Montan, D.N.; Nyholm, R.A.; Rector, N.L.

    1984-02-01

    The Spent Fuel Test - Climax (SFT-C) is located 420 m below surface in the Climax stock granite on the Nevada Test Site. The test is being conducted as part of the Nevada Nuclear Waste Storage Investigations. Eleven canisters of spent nuclear reactor fuel were emplaced, and six electrical simulators were energized April-May 1980. The spent-fuel canisters were retrieved and the thermal sources were de-energized in March-April 1983 when test data indicated that test objectives were met during the 3-year storage phase. The SFT-C operational objective of demonstrating the feasibility of packaging, transporting, storing, and retrieving highly radioactive fuel assemblies in a safe and reliable manner has been met. In addition to emplacement and retrieval operations, three exchanges of spent-fuel between the SFT-C and a surface storage facility, conducted during the storage phase, furthered this demonstration. Technical objectives of the test led to development of a technical measurements program, which is the subject of this and three previous interim reports. Geotechnical, seismological, and test status data have been recorded on a continuing basis for the 3-1/2 year duration of the test on more than 900 channels. Data acquisition from the test is now limited to instrumentation calibration and evaluation activities. Data now available for analysis are presented here. Highlights of activities this year include a campaign of in situ stress measurements, mineralogical and petrological studies of pretest core samples, microfracture analyses of laboratory irradiated cores, improved calculations of near-field heat transfer and thermomechanical response during the final months of heating as well as during a six-month cool-down period, metallurgical analyses of selected test components, and further development of the data acquisition and data management systems. 27 references, 68 figures, 10 tables.

  19. Sample results from the interim salt disposition program macrobatch 9 tank 21H qualification samples

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-11-01

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 9 for the Interim Salt Disposition Program (ISDP). This document reports characterization data on the samples of Tank 21H.

  20. Basis for Interim Operation for the K-Reactor in Cold Standby

    Shedrow, B.

    1998-10-19

    The Basis for Interim Operation (BIO) document for K Reactor in Cold Standby and the L- and P-Reactor Disassembly Basins was prepared in accordance with the draft DOE standard for BIO preparation (dated October 26, 1993).

  1. DQO Summary Report for 105-N/109-N Interim Safe Storage Project Waste Characterization

    T. A. Lee

    2005-09-15

    The DQO summary report provides the results of the DQO process completed for waste characterization activities for the 105-N/109-N Reactor Interim Safe Storage Project including decommission, deactivate, decontaminate, and demolish activities for six associated buildings.

  2. Hitrex 1: an interim report on experimental and analytical work on BNL's zero power HTR

    Beynon, A J; Kitching, S J; Lewis, T A; Waterson, R H

    1972-06-15

    This report presents interim experimental and theoretical results for the BNL Hitrex reactor. Reactivity effects and thermal and fast reaction rate distributions have been measured. Preliminary analysis has been performed, and some initial comparisons between theory and experiments made. (auth)

  3. Taking interim actions: Integrating CERCLA and NEPA to move ahead with site cleanup

    MacDonell, M.M.; Peterson, J.M.; Valett, G.L.; McCracken, S.H.

    1991-01-01

    The cleanup of contaminated sites can be expedited by using interim response actions in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). In fact, a major portion of some Superfund sites can be cleaned up using interim actions. For CERCLA sites being remediated by the US Department of Energy (DOE), such actions must also comply with the National Environmental Policy Act (NEPA) because the DOE has established a policy for integrating CERCLA and NEPA requirements. A strategy for the integrated documentation with implementation of interim actions has been applied successfully at the Weldon Spring site, and major cleanup projects are currently underway. This paper discusses some of the issues associated with integrating CERCLA and NEPA for interim actions and summarizes those actions that have been identified for the Weldon Spring site

  4. 7 CFR 1710.109 - Reimbursement of general funds and interim financing.

    2010-01-01

    ... LOANS AND GUARANTEES Loan Purposes and Basic Policies § 1710.109 Reimbursement of general funds and... replace interim financing used to finance equipment and facilities that were included in an RUS-approved...

  5. Safety evaluation of interim stabilization of non-stabilized single-shell watch list tanks

    Stahl, S.M.

    1994-12-30

    The report provides a summation of the status of safety issues associated with interim stabilization of Watch List SSTs (organic, ferrocyanide, and flammable gas), as extracted from recent safety analyses, including the Tank Farms Accelerated Safety Analysis efforts.

  6. DQO Summary Report for 105-N/109-N Interim Safe Storage Project Waste Characterization

    Lee, T.A.

    2005-01-01

    The DQO summary report provides the results of the DQO process completed for waste characterization activities for the 105-N/109-N Reactor Interim Safe Storage Project including decommission, deactivate, decontaminate, and demolish activities for six associated buildings.

  7. Safety evaluation of interim stabilization of non-stabilized single-shell watch list tanks

    Stahl, S.M.

    1994-01-01

    The report provides a summation of the status of safety issues associated with interim stabilization of Watch List SSTs (organic, ferrocyanide, and flammable gas), as extracted from recent safety analyses, including the Tank Farms Accelerated Safety Analysis efforts

  8. Taking interim actions: Integrating CERCLA and NEPA to move ahead with site cleanup

    MacDonell, M.M.; Peterson, J.M.; Valett, G.L.; McCracken, S.H.

    1991-01-01

    The cleanup of contaminated sites can be expedited by using interim response actions in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). In fact, a major portion of some Superfund sites can be cleaned up using interim actions. For CERCLA sites being remediated by the US Department of Energy (DOE), such actions must also comply with the National Environmental Policy Act (NEPA) because the DOE has established a policy for integrating CERCLA and NEPA requirements. A strategy for the integrated documentation and implementation of interim actions has been applied successfully at the Weldon Spring site, and major cleanup projects are currently underway. This paper discusses some of the issues associated with integrating CERCLA and NEPA for interim actions and summarizes those actions that have been identified for the Weldon Spring site

  9. Interim Measures Work Plan Expanded Bioventing System SWMU 55 (IRP Site FT-03)

    1997-01-01

    This interim measures work plan (IMWP) presents the scope for an expanded bioventing system to conduct in situ treatment of the remaining fuel-contaminated soils at solid waste management unit (SWMU...

  10. Basis for Interim Operation for the K-Reactor in Cold Standby

    Shedrow, B.

    1998-01-01

    The Basis for Interim Operation (BIO) document for K Reactor in Cold Standby and the L- and P-Reactor Disassembly Basins was prepared in accordance with the draft DOE standard for BIO preparation (dated October 26, 1993)

  11. Office of River Protection (ORP) Monthly Performance Report for July 2000

    WAGNILD, K.J.

    2000-01-01

    River Protection Project (RPP) performance for the month of July 2000 was very good. The most significant accomplishments that occurred during the month include the following: The Interim Stabilization Project pumped approximately 30,000 gallons from four tanks. Project-to-date (since June 1998) volume pumped is approximately 808,000 gallons. Five tanks have been interim stabilized this fiscal year, and tanks 241-S-106,241-U-103, and 241-U-105 are being evaluated to determine if the stabilization criteria have been met. Out of the 149 single-shell tanks (SSTs), 124 tanks have been stabilized. Pumping this waste from the single-shell tanks to more secure double-shell tanks (DSTs) supports stabilization of the waste tanks and mitigates leakage to the environment. The Interim Stabilization Project is planned to complete by September 2004. Waste Characterization obtained one grab sample in the month of July 2000. A total of 14 core samples, 12 grab samples, and 6 vapor samples have been taken fiscal year-to-date (FYTD) in support of three key FY 2000 sampling milestones. The Waste Treatment Plant Design and Operation organizations have been developed and staffed, including transitioning BNFL Inc./Bechtel National Inc. employees to CHG. Since the termination of the BNFL contract, CHG has temporarily assumed the work scope for design and operation of the Waste Treatment Plant. A new waste treatment facility will be built at the Hanford Site in which highly radioactive waste from the tanks will be turned into glass and permanently stored. Approval of the Notice of Construction (NOC) for the AN Farm tank retrieval system was received from the U.S. Department of Energy (DOE) and the Environmental Protection Agency on July 21,2000. This is a significant step forward for Project W-211, ''Initial Tank Retrieval Systems'' in preparing waste for delivery to the Waste Treatment Plant

  12. Your Baby's Growth: 5 Months

    ... Safe Videos for Educators Search English Español Your Baby's Growth: 5 Months KidsHealth / For Parents / Your Baby's ... a cause for concern. How Much Will My Baby Grow? By 5 months, your baby's birth weight ...

  13. Your Child's Development: 9 Months

    ... Child's Development: 9 Months Print en español El desarrollo de su hijo: 9 meses Nine-month-olds ... item in each hand at the same time Social and Emotional Development might be fearful of strangers ...

  14. On-site interim storage of spent nuclear fuel: Emerging public issues

    Feldman, D.L.; Tennessee Univ., Knoxville, TN

    1992-01-01

    Failure to consummate plans for a permanent repository or above- ground interim Monitored Retrievable Storage (MRS) facility for spent nuclear fuel has spurred innovative efforts to ensure at-reactor storage in an environmentally safe and secure manner. This article examines the institutional and socioeconomic impacts of Dry Cask Storage Technology (DCST)-an approach to spent fuel management that is emerging as the preferred method of on-site interim spent fuel storage by utilities that exhaust existing storage capacity

  15. Federal Administrative Court confirms interim action for the Kruemmel power plant site

    Anon.

    1982-01-01

    The interim action concerning the reactor site was confirmed in 1972, the action of voidance because of the possible injuriousness to health was rejected in the first instance. In the appeal OVG Lueneburg had sharpened three clauses concerning the contents of the restrictions and injunctions included in the interim action to the disadvantage of the operator. Responding to a new appeal the BVerwG has eliminated these restrictions and dismissed the following appeals of the plaintiffs. (HP) [de

  16. Final hazard classification and auditable safety analysis for the 105-C Reactor Interim Safe Storage Project

    Rodovsky, T.J.; Larson, A.R.; Dexheimer, D.

    1996-12-01

    This document summarizes the inventories of radioactive and hazardous materials present in the 105-C Reactor Facility and the operations associated with the Interim Safe Storage Project which includes decontamination and demolition and interim safe storage of the remaining facility. This document also establishes a final hazard classification and verifies that appropriate and adequate safety functions and controls are in place to reduce or mitigate the risk associated with those operations

  17. Acceptable TRU packaging for interim storage and/or terminal isolation: FY-1977 final report

    Doty, J.W.; Peterson, J.B.

    1978-01-01

    A program was conducted for the definition and demonstration of acceptable waste packages for defense transuranic waste for interim storage and terminal isolation. During FY-1977, a Contractor Questionnaire was used to gather pertinent data and to assess contractor concerns. This information was integrated into basic application data in the form of a checklist. Conceptual Container Design Specifications were developed by analyzing and evaluating the application data against Federal Regulations and interim/terminal storage constraints

  18. Monthly energy review, August 1997

    NONE

    1997-08-01

    The Monthly Energy Review for the month of August 1997, presents an overview of the Energy Information Administration`s recent monthly energy statistics. The statistics cover the major activities of U.S. production, consumption, trade, stocks, and prices for petroleum, natural gas, coal, electricity, and nuclear energy. Also included are international energy and thermal and metric conversion factors.

  19. Combined Modality Treatment for PET-Positive Non-Hodgkin Lymphoma: Favorable Outcomes of Combined Modality Treatment for Patients With Non-Hodgkin Lymphoma and Positive Interim or Postchemotherapy FDG-PET

    Halasz, Lia M. [Harvard Radiation Oncology Program, Boston, Massachusetts (United States); Jacene, Heather A. [Department of Imaging, Dana-Farber Cancer Institute, and Department of Radiology, Brigham and Women' s Hospital, Boston, Massachusetts (United States); Catalano, Paul J. [Department of Biostatistics and Computational Biology, Dana-Farber Cancer Institute, Boston, Massachusetts (United States); Van den Abbeele, Annick D. [Department of Imaging, Dana-Farber Cancer Institute, and Department of Radiology, Brigham and Women' s Hospital, Boston, Massachusetts (United States); LaCasce, Ann [Department of Medical Oncology, Dana-Farber Cancer Institute, Boston, Massachusetts (United States); Mauch, Peter M. [Department of Radiation Oncology, Dana-Farber Cancer Institute, Brigham and Women' s Hospital, Boston, Massachusetts (United States); Ng, Andrea K., E-mail: ang@lroc.harvard.edu [Department of Radiation Oncology, Dana-Farber Cancer Institute, Brigham and Women' s Hospital, Boston, Massachusetts (United States)

    2012-08-01

    Purpose: To evaluate outcomes of patients treated for aggressive non-Hodgkin lymphoma (NHL) with combined modality therapy based on [{sup 18}F]fluoro-2-deoxy-2-D-glucose positron emission tomography (FDG-PET) response. Methods and Materials: We studied 59 patients with aggressive NHL, who received chemotherapy and radiation therapy (RT) from 2001 to 2008. Among them, 83% of patients had stage I/II disease. Patients with B-cell lymphoma received R-CHOP (rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisone)-based chemotherapy, and 1 patient with anaplastic lymphoma kinase-negative anaplastic T-cell lymphoma received CHOP therapy. Interim and postchemotherapy FDG-PET or FDG-PET/computed tomography (CT) scans were performed for restaging. All patients received consolidated involved-field RT. Median RT dose was 36 Gy (range, 28.8-50 Gy). Progression-free survival (PFS) and local control (LC) rates were calculated with and without a negative interim or postchemotherapy FDG-PET scan. Results: Median follow-up was 46.5 months. Thirty-nine patients had negative FDG-PET results by the end of chemotherapy, including 12 patients who had a negative interim FDG-PET scan and no postchemotherapy PET. Twenty patients were FDG-PET-positive, including 7 patients with positive interim FDG-PET and no postchemotherapy FDG-PET scans. The 3-year actuarial PFS rates for patients with negative versus positive FDG-PET scans were 97% and 90%, respectively. The 3-year actuarial LC rates for patients with negative versus positive FDG-PET scans were 100% and 90%, respectively. Conclusions: Patients who had a positive interim or postchemotherapy FDG-PET had a PFS rate of 90% at 3 years after combined modality treatment, suggesting that a large proportion of these patients can be cured with consolidated RT.

  20. DATA MINING METHODOLOGY FOR DETERMINING THE OPTIMAL MODEL OF COST PREDICTION IN SHIP INTERIM PRODUCT ASSEMBLY

    Damir Kolich

    2016-03-01

    Full Text Available In order to accurately predict costs of the thousands of interim products that are assembled in shipyards, it is necessary to use skilled engineers to develop detailed Gantt charts for each interim product separately which takes many hours. It is helpful to develop a prediction tool to estimate the cost of interim products accurately and quickly without the need for skilled engineers. This will drive down shipyard costs and improve competitiveness. Data mining is used extensively for developing prediction models in other industries. Since ships consist of thousands of interim products, it is logical to develop a data mining methodology for a shipyard or any other manufacturing industry where interim products are produced. The methodology involves analysis of existing interim products and data collection. Pre-processing and principal component analysis is done to make the data “user-friendly” for later prediction processing and the development of both accurate and robust models. The support vector machine is demonstrated as the better model when there are a lower number of tuples. However as the number of tuples is increased to over 10000, then the artificial neural network model is recommended.

  1. Physical protection of shipments of irradiated reactor fuel; Interim guidance. Regulatory report

    1980-06-01

    During May, 1979, the U.S. Nuclear Regulatory Commission approved for issuance in effective form new interim regulations for strengthening the protection of spent fuel shipments against sabotage and diversion. The new regulations were issued without benefit of public comment, but comments from the public were solicited after the effective date. Based upon the public comments received, the interim regulations were amended and reissued in effective form as a final interim rule in May, 1980. The present document supersedes a previously issued interim guidance document, NUREG-0561 (June, 1979) which accompanied the original rule. This report has been revised to conform to the new interim regulations on the physical protection of shipments of irradiated reactor fuel which are likely to remain in effect until the completion of an ongoing research program concerning the response of spent fuel to certain forms of sabotage, at which time the regulations may be rescinded, modified or made permanent, as appropriate. This report discusses the amended regulations and provides a basis on which licensees can develop an acceptable interim program for the protection of spent fuel shipments

  2. Interim LCA comparison of metal working fluids with and without Chlorinated paraffins

    Olsen, Stig Irving; Christensen, Frans Møller

    2002-01-01

    tube with an outer diameter of 19.5 mm and material thickness of 1.65 mm (corresponding to approx. 1340 m tube). The tube is used as a heat-exchanger tube and the quality named 2205. The study has focused on European based operations since most known processes in the product system takes place...... raw materials to the producer of MWF. Transport from MWF supplier to the company is assumed to be identical for the two alternatives. All energy data has been taken from the LCAiT database, so e.g. electricity is European average from 1994. The MWFs used are produced in Sweden and data has been....... The results of the impact assessment show that there are only minor differences between the two alternative systems. The differences are due to a slightly larger use of energy and steel in the production of tubes when using the non-chlorinated alternative to MCCP based MWF, i.e. a slightly less environmental...

  3. National Ignition Facility Cryogenic Target Systems Interim Management Plan

    Warner, B

    2002-01-01

    Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize the National Ignition Facility (NIF) Cryogenic Target Handling Systems (NCTS) Program, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NCTS. Preparation of a Program Execution Plan (PEP) for NCTS has been initiated, and a current draft is provided as Attachment 1 to this document. The National Ignition Facility is a multi-megajoule laser facility being constructed at Lawrence Livermore National Laboratory (LLNL) by the National Nuclear Security Administration (NNSA) in the Department of Energy (DOE). Its primary mission is to support the Stockpile Stewardship Program (SSP) by performing experiments studying weapons physics, including fusion ignition. NIF also supports the missions of weapons effects, inertial fusion energy, and basic science in high-energy-density physics. NIF will be operated by LLNL under contract to the University of California (UC) as a national user facility. NIF is a low-hazard, radiological facility, and its operation will meet all applicable federal, state, and local Environmental Safety and Health (ES and H) requirements. The NCTS Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope, cost, and schedule. The NIF Director controls the NIF Cryogenic Target Systems Interim Management Plan. Overall scope content and execution schedules for the High Energy Density Physics Campaign (SSP Campaign 10) are currently undergoing rebaselining and will be brought into alignment with resources expected to be available throughout the NNSA Future Years National Security Plan (FYNSP). The revised schedule for

  4. 75 FR 984 - Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites

    2010-01-07

    ...The Environmental Protection Agency (EPA or the Agency) is announcing a 50-day public comment period for draft recommended interim preliminary remediation goals (PRGs) developed in the Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and Resource Conservation and Recovery Act (RCRA) Sites. EPA's Office of Solid Waste and Emergency and Emergency Response (OSWER) has developed the draft recommended interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer- reviewed toxicity values and current EPA equations and default exposure assumptions. This Federal Register notice is intended to provide an opportunity for public comment on the draft recommended interim PRGs. EPA will consider any public comments submitted in accordance with this notice and may revise the draft recommended interim PRGs thereafter.

  5. Maywood Interim Storage Site environmental report for calendar year 1992, 100 West Hunter Avenue, Maywood, New Jersey

    1993-05-01

    This report describes the environmental surveillance program at the Maywood Interim Storage Site (MISS) and provides the results for 1992. Environmental monitoring of MISS began in 1984, when the site was assigned to DOE by Congress through the Energy and Water Development Appropriations Act and was placed under DOE's Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. MISS is part of a National Priorities List (NPL) site. The environmental surveillance program at MISS includes sampling networks for radon and thoron in air; external gamma radiation exposure; and radium-226, radium-228, thorium-232, and total uranium in surface water, sediment, and groundwater. Additionally, chemical analysis includes metals and organic compounds in surface water and groundwater and metals in sediments. This program assists in fulfilling the DOE objective of measuring and monitoring effluents from DOE activities and calculating hypothetical doses to members of the general public. Monitoring results are compared with applicable Environmental Protection Agency (EPA) and state standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements. Environmental standards are established to protect public health and the environment. The radiological data for all media sampled support the conclusion that doses to the public are not distinguishable from natural background radiation

  6. Heavy metals

    Adriano, Domy; VANGRONSVELD, Jaco; Bolan, N.S.; Wenzel, W.W.

    2005-01-01

    - Sources of Metals in the Environment - Environmental Contamination - Retention and Dynamics of Metals in Soils - Adsorption - Complexation - Precipitation - Bioavailability–Natural Attenuation Interactions - Biological Response to Metals - Soil Remediation

  7. Interim main report of the safety assessment SR-Can

    Hedin, Allan [and others

    2004-08-01

    This document is an interim report on the safety assessment SR-Can (SR in the acronym stands for Safety Report and Can is short for canister). The final SR-Can report will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of the present interim report is to demonstrate the methodology for safety assessment so that it can be reviewed before it is used in a license application. The assessment relates to the KBS-3 disposal concept in which copper canisters with a cast iron insert containing spent nuclear fuel are surrounded by bentonite clay and deposited at approximately 500 m depth in saturated, granitic rock. Preliminary data from the Forsmark site, presently being investigated by SKB as one of the candidate for a KBS-3 repository are used to some extent as examples. However, the collected data are yet too sparse to allow an evaluation of safety for this site. An important aim of this report is to demonstrate the proper handling of requirements on the safety assessment in applicable regulations. Therefore, regulations issued by the Swedish Nuclear Power Inspectorate and the Swedish Radiation Protection Authority are duplicated in an Appendix. The principal acceptance criterion requires that 'the annual risk of harmful effects after closure does not exceed 10{sup -6} for a representative individual in the group exposed to the greatest risk'. 'Harmful effects' refer to cancer and hereditary effects. Following the introductory chapter 1, this report outlines the methodology for the SR-Can assessment in chapter 2, and presents in chapters 3, 4 and 5 the initial state of the system and the plans and methods for handling external influences and internal processes, respectively. Function indicators are introduced in chapter 6 and a preliminary evaluation of these is given in chapter 7. The material presented in the first seven chapters is utilised in the scenario selection in chapter 8

  8. Interim main report of the safety assessment SR-Can

    Hedin, Allan (ed.) [and others

    2004-08-01

    This document is an interim report on the safety assessment SR-Can (SR in the acronym stands for Safety Report and Can is short for canister). The final SR-Can report will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of the present interim report is to demonstrate the methodology for safety assessment so that it can be reviewed before it is used in a license application. The assessment relates to the KBS-3 disposal concept in which copper canisters with a cast iron insert containing spent nuclear fuel are surrounded by bentonite clay and deposited at approximately 500 m depth in saturated, granitic rock. Preliminary data from the Forsmark site, presently being investigated by SKB as one of the candidate for a KBS-3 repository are used to some extent as examples. However, the collected data are yet too sparse to allow an evaluation of safety for this site. An important aim of this report is to demonstrate the proper handling of requirements on the safety assessment in applicable regulations. Therefore, regulations issued by the Swedish Nuclear Power Inspectorate and the Swedish Radiation Protection Authority are duplicated in an Appendix. The principal acceptance criterion requires that 'the annual risk of harmful effects after closure does not exceed 10{sup -6} for a representative individual in the group exposed to the greatest risk'. 'Harmful effects' refer to cancer and hereditary effects. Following the introductory chapter 1, this report outlines the methodology for the SR-Can assessment in chapter 2, and presents in chapters 3, 4 and 5 the initial state of the system and the plans and methods for handling external influences and internal processes, respectively. Function indicators are introduced in chapter 6 and a preliminary evaluation of these is given in chapter 7. The material presented in the first seven chapters is utilised in the scenario selection

  9. Interim main report of the safety assessment SR-Can

    Hedin, Allan

    2004-08-01

    This document is an interim report on the safety assessment SR-Can (SR in the acronym stands for Safety Report and Can is short for canister). The final SR-Can report will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of the present interim report is to demonstrate the methodology for safety assessment so that it can be reviewed before it is used in a license application. The assessment relates to the KBS-3 disposal concept in which copper canisters with a cast iron insert containing spent nuclear fuel are surrounded by bentonite clay and deposited at approximately 500 m depth in saturated, granitic rock. Preliminary data from the Forsmark site, presently being investigated by SKB as one of the candidate for a KBS-3 repository are used to some extent as examples. However, the collected data are yet too sparse to allow an evaluation of safety for this site. An important aim of this report is to demonstrate the proper handling of requirements on the safety assessment in applicable regulations. Therefore, regulations issued by the Swedish Nuclear Power Inspectorate and the Swedish Radiation Protection Authority are duplicated in an Appendix. The principal acceptance criterion requires that 'the annual risk of harmful effects after closure does not exceed 10 -6 for a representative individual in the group exposed to the greatest risk'. 'Harmful effects' refer to cancer and hereditary effects. Following the introductory chapter 1, this report outlines the methodology for the SR-Can assessment in chapter 2, and presents in chapters 3, 4 and 5 the initial state of the system and the plans and methods for handling external influences and internal processes, respectively. Function indicators are introduced in chapter 6 and a preliminary evaluation of these is given in chapter 7. The material presented in the first seven chapters is utilised in the scenario selection in chapter 8. Hydrogeological

  10. Thermal-hydraulic experiment and analysis for interim dry storage of spent nuclear fuel

    Yoo, Seung Hun

    2011-02-01

    parameters including grid sizes, radiation model, boundary conditions, a small-scale model was designed and tested which has the main components of a dry storage cask, such as fuel rods, basket and cask. Based on the sensitivity study the full-scope simulations by FLUENT were performed and compared with the experiment data and COBRA-SFS results. FLUENT results for the perdition of temperature distribution were agreed within measurement uncertainty. However, there were larger deviations for prediction of velocity between FLUENT and COBRA-SFS. The velocity predicted by COBRA-SFS was much higher than that predicted by FLUENT. The sensitivity studies with the full-scope simulation model were performed for a grid size and basket gap sizes. It was revealed that the basket gap size was the most sensitive parameter deciding the PCT in the dry storage cask. By this study, we proposed an applicable guideline of CFD use for the full-scope simulation of the dry storage cask. In the third study, a new type of the interim storage, which consists of one tunnel with eighty metal storage casks and one chimney, was proposed and studied. The tunnel-type storage has the following advantages: the reduction of the risk of the air plane crash and the easy control of the capacity of the system through the height of the chimney. The thermal-hydraulic characteristics of the tunnel storage were analyzed by FLUENT. The CFD simulation methodology was validated against the experimental data of a vault storage system (Sakamoto et al., 2000) because of the similar thermal-hydraulic characteristics between the tunnel and the vault. Then, the sensitivity studies of three parameters were done: the tunnel geometry, the cask arrangement and the turbulence. The local peak temperature on the metal casks is mainly governed by mass flow rates in the gaps. V1 case was recommended for the accommodation of the metal storage casks in the tunnel. The staggered cask arrangement was recommended due to the advantageous

  11. Clinical outcome and microvascular blood flow in VAC® - and Sorbalgon® -treated peri-vascular infected wounds in the groin after vascular surgery - an early interim analysis.

    Acosta, Stefan; Monsen, Christina; Dencker, Magnus

    2013-08-01

    Vacuum-assisted wound closure (VAC(®)) therapy is considered to be superior to conventional dressings in the treatment of peri-vascular groin infections after vascular surgery at our department. Therefore, we performed an early interim analysis of the clinical outcomes in these seriously ill patients at risk of amputation and death. Patients were randomised to either VAC(®) (n = 5) or Sorbalgon(®) (n = 5; best alternative treatment) therapy after surgical debridement. Non-invasive, laser Doppler perfusion imaging (LDPI) studies of the skin adjacent to the undressed wound were performed after 14 days of wound treatment. There was no difference in LDPI values in VAC(®) versus Sorbalgon(®) treated patients (P = 0·46). One patient in the VAC(®) group suffered from two re-bleeding episodes, leading to vascular resection and transfemoral amputation and in the Sorbalgon(®) group two had a complete wound healing time of more than 4 months and one had a visible interposition bypass graft in the groin after 1 month of treatment. No patient died of the groin infection. Although not statistically proven, fewer wound treatment failures were recorded in the VAC(®) group, justifying this early interim analysis. LDPI studies were feasible. © 2012 The Authors. International Wound Journal © 2012 John Wiley & Sons Ltd and Medicalhelplines.com Inc.

  12. In vitro evaluation of the marginal integrity of CAD/CAM interim crowns.

    Kelvin Khng, Kwang Yong; Ettinger, Ronald L; Armstrong, Steven R; Lindquist, Terry; Gratton, David G; Qian, Fang

    2016-05-01

    The accuracy of interim crowns made with computer-aided design and computer-aided manufacturing (CAD/CAM) systems has not been well investigated. The purpose of this in vitro study was to evaluate the marginal integrity of interim crowns made by CAD/CAM compared with that of conventional polymethylmethacrylate (PMMA) crowns. A dentoform mandibular left second premolar was prepared for a ceramic crown and scanned for the fabrication of 60 stereolithical resin dies, half of which were scanned to fabricate 15 Telio CAD-CEREC and 15 Paradigm MZ100-E4D-E4D crowns. Fifteen Caulk and 15 Jet interim crowns were made on the remaining resin dies. All crowns were cemented with Tempgrip under a 17.8-N load, thermocycled for 1000 cycles, placed in 0.5% acid fuschin for 24 hours, and embedded in epoxy resin before sectioning from the mid-buccal to mid-lingual surface. The marginal discrepancy was measured using a traveling microscope, and dye penetration was measured as a percentage of the overall length under the crown. The mean vertical marginal discrepancy of the conventionally made interim crowns was greater than for the CAD/CAM crowns (P=.006), while no difference was found for the horizontal component (P=.276). The mean vertical marginal discrepancy at the facial surface of the Caulk crowns was significantly greater than that of the other 3 types of interim crowns (Pmargin, the mean horizontal component of the Telio crowns was significantly larger than that of the other 3 types, with no difference at the lingual margins (P=.150). The mean percentage dye penetration for the Paradigm MZ100-E4D crowns was significantly greater and for Jet crowns significantly smaller than for the other 3 crowns (Pmarginal discrepancies of the Jet interim crowns at the facial surface and with the horizontal marginal discrepancies of the Caulk interim crowns at the lingual surface (Pmarginal discrepancy was found with the interim crowns fabricated by CAD/CAM as compared with PMMA crowns

  13. Frequency and Type of Prosthetic Complications Associated with Interim, Immediately Loaded Full-Arch Prostheses: A 2-Year Retrospective Chart Review.

    Drago, Carl

    2016-08-01

    The purpose of this report was to retrospectively evaluate implant and immediate full-arch prosthesis survival rates over a 24-month period; patients were consecutively treated with immediate occlusal loading. Dental arch, gender, and implant orientation (vertical vs. tilted) were also noted. All Brånemark System implants (Nobel Active) and interim, all-acrylic resin prostheses placed in patients following an All-on-Four™ protocol, in a single private practice were assessed by retrospective patient chart review. The amount of space provided surgically for implant restorative components and prostheses was determined from measurements of the vertical heights of the interim prostheses in the right/left anterior and posterior segments. These measurements were made in the laboratory. Interim prosthetic repairs (type, frequency, length of time from insertion) were analyzed by type, arch, gender, and implant orientation. Implant survival and insertion torque values were also measured. Inclusion criteria consisted of all Brånemark System implants placed with the All-on-Four protocol from September 1, 2011, until August 31, 2013. Specific dietary instructions were given for the first 7 days immediately postoperatively and for the weeks prior to insertion of the definitive prostheses. One hundred twenty-nine patients, comprising 191 arches (766 implants) from September 1, 2011, until August 31, 2013, were included in the study. One patient experienced implant failure yielding an overall implant survival rate (SR) of 99.5% (762 of 766). Four hundred twenty-six of 430 maxillary implants and 336 of 336 mandibular implants survived for SRs of 99.1% and 100%, respectively. Regarding implant orientation, 415 of 417 tilted implants (SR 99.5%) and 343 of 345 (CSR 95.6%) vertical implants were noted to be clinically stable. Interim, all-acrylic resin prostheses were in place for a mean of 199.2 days; mandibular prostheses were in place for an average of 195.4 days; maxillary

  14. DEVELOPMENT OF THERAPEUTIC STRATEGIES FOR OBESITY AND COMORBID DISORDERS BASED ON OBSERVATIONAL PROGRAMS: INTERIM RESULTS OF THE RUSSIAN OBSERVATIONAL PROGRAM PRIMAVERA

    E. A. Troshina

    2015-01-01

    Full Text Available Aim: To assess interim results of the Russian observational program PrimaVera on efficacy and safety sibutramine (Reduxin® for treatment of obesity within routine medical practice. Materials and methods: This multicenter observational program included patients with obesity aged below 65  years, excluding those with uncontrolled arterial hypertension, coronary heart disease, heart failure and cerebrovascular disease. All patients were administered sibutramine for treatment of their obesity. During out-patient follow-up visits, physicians assessed changes in patients’ body mass, blood pressure and heart rate, as well as registered adverse events. Maximal treatment duration was 12 months. In this report, the results from 16  515  patients are analyzed, 82% of whom (n=13 192 were females.Results: After 3  months of treatment body mass index (BMI decreased by 2.81±1.0  kg/m², after 6 months, by 5.17±2.15 kg/m². At 12 months decrease in BMI was 1.3-fold higher compared to 6  months’ results and amounted to 6.76±2.93  kg/m². Reduction of body mass with longterm (above 6  months treatment with sibutramine under supervision of a physician was associated with a decrease in systolic and diastolic blood pressure levels (by 4.1 mm Hg, in both cases and did not lead to an increase in heart rate (Δ=-1.02  bpm. Based on data from 16  515  medical records processed up to now, 397  episodes of adverse events were registered, with none of them being serious.Conclusion: This interim results of the program PrimaVera confirmed favorable safety profile of Reduxin® and its high efficacy in the treatment of obesity.

  15. Finding of no significant impact. Consolidation and interim storage of special nuclear material at Rocky Flats Environmental Technology Site

    NONE

    1995-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA -- 1060, for the consolidation, processing, and interim storage of Category I and II special nuclear material (SNM) in Building 371 at the Rocky Flats Environmental Technology Site (hereinafter referred to as Rocky Flats or Site), Golden, Colorado. The scope of the EA included alternatives for interim storage including the no action alternative, the construction of a new facility for interim storage at Rocky Flats, and shipment to other DOE facilities for interim storage.

  16. Finding of no significant impact. Consolidation and interim storage of special nuclear material at Rocky Flats Environmental Technology Site

    1995-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA -- 1060, for the consolidation, processing, and interim storage of Category I and II special nuclear material (SNM) in Building 371 at the Rocky Flats Environmental Technology Site (hereinafter referred to as Rocky Flats or Site), Golden, Colorado. The scope of the EA included alternatives for interim storage including the no action alternative, the construction of a new facility for interim storage at Rocky Flats, and shipment to other DOE facilities for interim storage

  17. SI units for radiation protection - an interim measure

    Burns, J.E.

    1982-01-01

    The brief memorandum comments on the problems concerning the delay in publishing the report of the ICRU working group on the change to SI units and makes the following suggestions to organisations considering whether to change over to SI units in the near future: a) It would be preferable to delay change-over to SI units for quantities specifying radiation for protection purposes until ICRU publishes its recommendations. This would avoid the risk of having to make two successive changes in procedure, with their attendant cost, need for retraining and the possibility of errors. (b) If, however, in order to be consistent with a change to SI units that has already been made in other applications of radiation, there are strong reasons for changing to SI units before the ICRU recommendations are published, then as an interim measure, measurements of exposure may be converted to dose equivalent using the approximation that 1 mR = 10 μSv. A decision as to whether to alter the scales of existing instruments, or to convert readings to dose equivalent at a later stage will depend on individual circumstances. (U.K.)

  18. Spent Fuel Long Term Interim Storage: The Spanish Policy

    Fernandez-Lopez, Javier

    2014-01-01

    ENRESA is the Spanish organization responsible for long-term management of all categories of radioactive waste and nuclear spent fuel and for decommissioning nuclear installations. It is also in charge of the management of the funds collected from waste producers and electricity consumers. The national policy about radioactive waste management is established at the General Radioactive Waste Plan by the Government upon proposal of the Ministry of Industry, Energy and Tourism. Now the Plan in force is the Sixth Plan approved in 2006. The policy on spent nuclear fuel, after description of the current available options, is set up as a long term interim storage at a Centralized Temporary Storage facility (CTS, or ATC in Spanish acronym) followed by geologic disposal, pending technological development on other options being eligible in the future. After a site selection process launched in 2009, the site for the ATC has been chosen at the end of 2011. The first steps for the implementation of the facility are described in the present paper. (authors)

  19. Fabrication and operational experience with the interim storage cask

    Scott, P.L.

    1998-01-01

    This paper discusses the fabrication and operational experience of the Interim Storage Cask (ISC). The ISC is a dry storage cask which is used to safely store a Core Component Container (CCC) containing up to seven Fast Flux Test Facility (FFTF) spent fuel assemblies at the US Department of Energy's Hanford Site. Under contract to B and W Hanford Company (BWHC), General Atomics (GA) designed and fabricated thirty ISC casks which BWHC is remotely loading at the FFTF facility. BWHC designed and fabricated the CCCS. As of December 1997, thirty ISCs have been fabricated, of which eighteen have been loaded and moved to a storage site adjacent to the FFTF facility. Fabrication consisted of three sets of casks. The first unit was completed and acceptance tested before any other units were fabricated. After the first unit passed all acceptance tests, nine more units were fabricated in the first production run. Before those nine units were completed, GA began a production run of twenty more units. The paper provides an overview of the cask design and discusses the problems encountered in fabrication, their resolution, and changes made in the fabrication processes to improve the quality of the casks. The paper also discusses the loading process and operational experiences with loading and handling of the casks. Information on loading times, worker dose exposure, and total dose for loading are presented

  20. Design criteria for the 200-ZP-1 interim remedial measure

    Mudge, J.F.; Olson, J.W.

    1995-08-01

    The Interim Remedial Measure Proposed Plan for the 200-ZP-1 Operable Unit recommended a pump and treat action to contain contaminated groundwater and limit further degradation of groundwater due to elevated concentrations of carbon tetrachloride, chloroform, and trichloroethylene in the 200-ZP-1 Operable Unit. This design criteria document defines the Project. The Project encompasses: site preparation; development of groundwater wells for monitoring, extraction, and injection; extraction and injection equipment; construction of a treatment system with support buildings/utilities; management; engineering design, analysis, and reporting; and operation and maintenance. A groundwater pump and treat system, hereafter the System, will be composed of extraction wells, a piping network, treatment equipment, water storage, and injection wells. Based upon engineering judgment, the selected technology in the proposed plan (DOE-RL 1994a) is air stripping of the organic contaminants followed by vapor-phase adsorption onto granulated activated carbon (GAC); liquid-phase GAC may be required as a polishing step. The Treatment Equipment refers to air stripping towers, adsorption vessels, water pumps, air blowers, instrumentation, and control devices which will be procured as a turn-key system

  1. Uranium exploration of the Colorado Plateau: interim staff report

    1980-10-01

    This report is an issue of the original draft copy of the Interim Staff Report on Uranium Exploration on the Colorado Plateau, dated June 1951. The original draft copy was only recently located and is being published at this time because of the interest in the contained historical content. The table of contents of this report lists: history of uranium mining; geology; proposed program for the geologic investigations section; general activities of industry and government; and future exploration of sedimentary uranium deposits and anticipated results. Under the proposed program section are: future of the copper-uranium deposits as a source of uranium; uraniferous asphaltite deposits; and commission exploration and future possibilities. The section on general activities of industry and government includes: exploratory and development drilling; field investigations and mapping; early geologic investigations and investigations by the US geological survey; and geophysical exploration. Tables are also presented on: uranium production by districts; US Geological survey drilling statistics; Colorado Exploration Branch drilling statistics; summary of drilling projects; and comparative yearly core-drill statistics on the Colorado Plateau

  2. Interim performance criteria for photovoltaic energy systems. [Glossary included

    DeBlasio, R.; Forman, S.; Hogan, S.; Nuss, G.; Post, H.; Ross, R.; Schafft, H.

    1980-12-01

    This document is a response to the Photovoltaic Research, Development, and Demonstration Act of 1978 (P.L. 95-590) which required the generation of performance criteria for photovoltaic energy systems. Since the document is evolutionary and will be updated, the term interim is used. More than 50 experts in the photovoltaic field have contributed in the writing and review of the 179 performance criteria listed in this document. The performance criteria address characteristics of present-day photovoltaic systems that are of interest to manufacturers, government agencies, purchasers, and all others interested in various aspects of photovoltaic system performance and safety. The performance criteria apply to the system as a whole and to its possible subsystems: array, power conditioning, monitor and control, storage, cabling, and power distribution. They are further categorized according to the following performance attributes: electrical, thermal, mechanical/structural, safety, durability/reliability, installation/operation/maintenance, and building/site. Each criterion contains a statement of expected performance (nonprescriptive), a method of evaluation, and a commentary with further information or justification. Over 50 references for background information are also given. A glossary with definitions relevant to photovoltaic systems and a section on test methods are presented in the appendices. Twenty test methods are included to measure performance characteristics of the subsystem elements. These test methods and other parts of the document will be expanded or revised as future experience and needs dictate.

  3. An interim report on the Zenith Exponential Experiments

    Absalom, R M; Cameron, I R; Kinchin, G H; Sanders, J E; Wilson, D J [Atomic Energy Establishment, Winfrith, Dorchester, Dorset (United Kingdom)

    1959-06-15

    The following memorandum gives an interim account of the exponential experiments with Zenith-type fuel elements being carried out at Winfrith. Results quoted are still subject to revision: however it is hoped that the description of the work at this stage will stimulate discussion and suggestions for further measurements before the experiment is dismantled later in the year. The measurements are being undertaken in order to form some initial understanding of the reactor physics of uranium 235-thorium-graphite systems of the type later to be studied in Zenith. There have been no previous investigations of this type of system in the U.K. though measurements on enriched uranium-graphite systems have been reported from the U.S.A.. A practical result of the measurements will be a revision of the estimated critical loadings for Zenith, since the exponential systems studied cover the range of loadings proposed for the first critical assemblies. The theoretical work on these systems includes a two-group analysis being carried on in the Zenith group and a multigroup analysis being made by the H.T.G.C. Technical Assessments Group, including a Monte Carlo study of resonance capture.

  4. Kennedy Space Center Press Site (SWMU 074) Interim Measure Report

    Applegate, Joseph L.

    2015-01-01

    This report summarizes the Interim Measure (IM) activities conducted at the Kennedy Space Center (KSC) Press Site ("the Press Site"). This facility has been designated as Solid Waste Management Unit 074 under KSC's Resource Conservation and Recovery Act Corrective Action program. The activities were completed as part of the Vehicle Assembly Building (VAB) Area Land Use Controls Implementation Plan (LUCIP) Elimination Project. The purpose of the VAB Area LUCIP Elimination Project was to delineate and remove soil affected with constituents of concern (COCs) that historically resulted in Land Use Controls (LUCs). The goal of the project was to eliminate the LUCs on soil. LUCs for groundwater were not addressed as part of the project and are not discussed in this report. This report is intended to meet the Florida Department of Environmental Protection (FDEP) Corrective Action Management Plan requirement as part of the KSC Hazardous and Solid Waste Amendments permit and the U.S. Environmental Protection Agency's (USEPA's) Toxic Substance Control Act (TSCA) self-implementing polychlorinated biphenyl (PCB) cleanup requirements of 40 Code of Federal Regulations (CFR) 761.61(a).

  5. DOUBLE TRACKS Test Site interim corrective action plan

    NONE

    1996-06-01

    The DOUBLE TRACKS site is located on Range 71 north of the Nellis Air Force Range, northwest of the Nevada Test Site (NTS). DOUBLE TRACKS was the first of four experiments that constituted Operation ROLLER COASTER. On May 15, 1963, weapons-grade plutonium and depleted uranium were dispersed using 54 kilograms of trinitrotoluene (TNT) explosive. The explosion occurred in the open, 0.3 m above the steel plate. No fission yield was detected from the test, and the total amount of plutonium deposited on the ground surface was estimated to be between 980 and 1,600 grams. The test device was composed primarily of uranium-238 and plutonium-239. The mass ratio of uranium to plutonium was 4.35. The objective of the corrective action is to reduce the potential risk to human health and the environment and to demonstrate technically viable and cost-effective excavation, transportation, and disposal. To achieve these objectives, Bechtel Nevada (BN) will remove soil with a total transuranic activity greater then 200 pCI/g, containerize the soil in ``supersacks,`` transport the filled ``supersacks`` to the NTS, and dispose of them in the Area 3 Radioactive Waste Management Site. During this interim corrective action, BN will also conduct a limited demonstration of an alternative method for excavation of radioactive near-surface soil contamination.

  6. Database and Interim Glass Property Models for Hanford HLW Glasses

    Hrma, Pavel R; Piepel, Gregory F; Vienna, John D; Cooley, Scott K; Kim, Dong-Sang; Russell, Renee L

    2001-01-01

    The purpose of this report is to provide a methodology for an increase in the efficiency and a decrease in the cost of vitrifying high-level waste (HLW) by optimizing HLW glass formulation. This methodology consists in collecting and generating a database of glass properties that determine HLW glass processability and acceptability and relating these properties to glass composition. The report explains how the property-composition models are developed, fitted to data, used for glass formulation optimization, and continuously updated in response to changes in HLW composition estimates and changes in glass processing technology. Further, the report reviews the glass property-composition literature data and presents their preliminary critical evaluation and screening. Finally the report provides interim property-composition models for melt viscosity, for liquidus temperature (with spinel and zircon primary crystalline phases), and for the product consistency test normalized releases of B, Na, and Li. Models were fitted to a subset of the screened database deemed most relevant for the current HLW composition region

  7. The UN Interim Administration Mission in Kosovo (UNMIK

    Alfonso J. Iglesias Velasco

    2001-12-01

    Full Text Available The current situation in the Province of Kosovo in the Republic of Serbia within the Yugoslav State became unsustainable in the late 1990´s as a result of the repressive policies of the Serbian authorities toward the Kosovar Albanians. International efforts tofind a peaceful solution to the conflict were unsuccessful, in large measure on account of Serbian intransigence, and the intensification of the conflict with tragic consequences for the Kosovar civilian population led the Atlantic Alliance in the spring of 1999 to a carryout a military intervention of, to say the least, dubious legality under international law, which in turn forced Serbian leaders to bow to the application of the solution worked out by the international community in the Rambouillet Accords and set down in UN Security Council Resolution 1244 (1999 of June 10, 1999. This resolution provided for two international entities in the province, one a security force (KFOR and the other civilian, the UN Interim Administration Mission (UNMIK. This paper analyzes the mission’s mandate and structure as well as the evolution of the peace process.

  8. Peer Review of the Waste Package Material Performance Interim Report

    J. A. Beavers; T. M. Devine, Jr.; G. S. Frankel; R. H. Jones; R. G. Kelly; R. M. Latanision; J. H. Payer

    2001-01-01

    At the request of the U.S. Department of Energy, Bechtel SAIC Company, LLC, formed the Waste Package Materials Performance Peer Review Panel (the Panel) to review the technical basis for evaluating the long-term performance of waste package materials in a proposed repository at Yucca Mountain, Nevada. This is the interim report of the Panel; a final report will be issued in February 2002. In its work to date, the Panel has identified important issues regarding waste package materials performance. In the remainder of its work, the Panel will address approaches and plans to resolve these issues. In its review to date, the Panel has not found a technical basis to conclude that the waste package materials are unsuitable for long-term containment at the proposed Yucca Mountain Repository. Nevertheless, significant technical issues remain unsettled and, primarily because of the extremely long life required for the waste packages, there will always be some uncertainty in the assessment. A significant base of scientific and engineering knowledge for assessing materials performance does exist and, therefore, the likelihood is great that uncertainty about the long-term performance can be substantially reduced through further experiments and analysis

  9. Lamar Low-Level Jet Program Interim Report

    Kelley, N.; Shirazi, M.; Jager, D.; Wilde, S.; Adams, J.; Buhl, M.; Sullivan, P.; Patton, E.

    2004-01-01

    This interim report presents the results to date from the Lamar Low-Level Jet Program (LLLJP) that has been established as joint effort among the U.S. Department of Energy (DOE), the National Wind Technology Center (NWTC) of the National Renewable Energy Laboratory (NREL), and General Electric Wind Energy (GE Wind). The purpose of this project is to develop an understanding of the influence of nocturnal low-level jet streams on the inflow turbulence environment and the documenting of any potential operating impacts on current large wind turbines and the Low Wind Speed Turbine (LWST) designs of the future. A year's record of detailed nocturnal turbulence measurements has been collected from NREL instrumentation installed on the GE Wind 120-m tower in southeastern Colorado and supplemented with mean wind profile data collected using an acoustic wind profiler or SODAR (Sound Detection and Ranging). The analyses of measurements taken as part of a previous program conducted at the NWTC have been used to aid in the interpretation of the results of representative case studies of data collected from the GE Wind tower.

  10. Interim report of working group of Nuclear Fusion Committee

    Takuma, Hiroshi

    1986-01-01

    The conclusion of the working group was presented as an interim report to the general meeting of Nuclear Fusion Committee, which became the base for deciding the future plan. The report was the result of the hard work for about a half year by five Committee experts and 23 researchers, and has the rich contents. At present, the supply of petroleum relaxed, and the trend that a large amount of investment for a long period for nuclear fusion research is problematical has become strong. Of course, the importance of the nuclear fusion research never changes. The research projects of Heliotron E, Gekko 12, Gamma 10 and so on have advanced, and the base for synthetically promoting the research has been completed. It is indispensable to decide the most effective plan for the next stage. The working group discussed on the five year plan, especially on the research based on a large project. The policy of the works and problems, the progress of the works of respective subgroups, and the summarization are reported. The researches on nuclear burning simulation, no current plasma using an external conductor system and making an axisymmetrical high-beta torus steady were proposed. (Kako, I.)

  11. Honeywell Cascade Distiller System Performance Testing Interim Results

    Callahan, Michael R.; Sargusingh, Miriam

    2014-01-01

    The ability to recover and purify water through physiochemical processes is crucial for realizing long-term human space missions, including both planetary habitation and space travel. Because of their robust nature, distillation systems have been actively pursued as one of the technologies for water recovery. The Cascade Distillation System (CDS) is a vacuum rotary distillation system with potential for greater reliability and lower energy costs than existing distillation systems. The CDS was previously under development through Honeywell and NASA. In 2009, an assessment was performed to collect data to support down-selection and development of a primary distillation technology for application in a lunar outpost water recovery system. Based on the results of this testing, an expert panel concluded that the CDS showed adequate development maturity, TRL-4, together with the best product water quality and competitive weight and power estimates to warrant further development. The Advanced Exploration Systems (AES) Water Recovery Project (WRP) worked to address weaknesses identified by The Panel; namely bearing design and heat pump power efficiency. Testing at the NASA-JSC Advanced Exploration System Water Laboratory (AES Water Lab) using a prototype Cascade Distillation Subsystem (CDS) wastewater processor (Honeywell International, Torrance, Calif.) with test support equipment and control system developed by Johnson Space Center was performed to evaluate performance of the system with the upgrades. The CDS will also have been challenged with ISS analog waste streams and a subset of those being considered for Exploration architectures. This paper details interim results of the AES WRP CDS performance testing.

  12. Monthly Program Cost Report (MPCR)

    Department of Veterans Affairs — The Monthly Program Cost Report (MPCR) replaces the Cost Distribution Report (CDR). The MPCR provides summary information about Veterans Affairs operational costs,...

  13. Monthly energy review, January 1998

    NONE

    1998-01-01

    This report presents an overview of recent monthly energy statistics. Major activities covered include production, consumption, trade, stocks, and prices for fossil fuels, electricity, and nuclear energy.

  14. Natural gas monthly, August 1995

    NONE

    1995-08-24

    The Natural Gas Monthly (NGM) highlights activities, events, and analyses of interest to public and private sector organizations associated with the natural gas industry. Volume and price data are presented each month for natural gas production, distribution, consumption, and interstate pipeline activities. Producer-related activities and underground storage data are also reported. From time to time, the NGM features articles designed to assist readers in using and interpreting natural gas information. This month`s feature article is on US Natural Gas Imports and Exports 1994.

  15. Climate Prediction Center - monthly Outlook

    Weather Service NWS logo - Click to go to the NWS home page Climate Prediction Center Site Map News Outlooks monthly Climate Outlooks Banner OFFICIAL Forecasts June 2018 [UPDATED MONTHLY FORECASTS SERVICE ) Canonical Correlation Analysis ECCA - Ensemble Canonical Correlation Analysis Optimal Climate Normals

  16. Monthly energy review, January 1999

    NONE

    1999-01-01

    The Monthly Energy Review (MER) presents an overview of the Energy Information Administration`s recent monthly energy statistics. The statistics cover the major activities of US production, consumption, trade, stocks, and prices for petroleum, natural gas, coal, electricity, and nuclear energy. Also included are international energy and thermal and metric conversion factors. 37 figs., 61 tabs.

  17. Monthly energy review, July 1998

    NONE

    1998-07-01

    The Monthly Energy Review (MER) presents an overview of the Energy Information Administration`s recent monthly energy statistics. The statistics cover the major activities of US production, consumption, trade, stocks, and prices for petroleum, natural gas, coal, electricity, and nuclear energy. Also included are international energy and thermal and metric conversion factors. 37 figs. 73 tabs.

  18. Monthly energy review, May 1999

    NONE

    1999-05-01

    The Monthly Energy Review (MER) presents an overview of the Energy Information Administration`s recent monthly energy statistics. The statistics cover the major activities of US production, consumption, trade, stocks, and prices for petroleum, natural gas, coal, electricity, and nuclear energy. Also included are international energy and thermal and metric conversion factors. 37 figs., 61 tabs.

  19. Monthly energy review, March 1999

    NONE

    1999-03-01

    The Monthly Energy Review (MER) presents an overview of the Energy Information Administration`s recent monthly energy statistics. The statistics cover the major activities of US production, consumption, trade, stocks, and prices for petroleum, natural gas, coal, electricity, and nuclear energy. Also included are international energy and thermal and metric conversion factors. 37 figs., 74 tabs.

  20. Monthly energy review, November 1997

    NONE

    1997-11-01

    The Monthly Energy Review (MER) presents an overview of the Energy Information Administration`s recent monthly energy statistics. The statistics cover the major activities of US production, consumption, trade, stocks, and prices for petroleum, natural gas, coal, electricity, and nuclear energy. Also included are international energy and thermal and metric conversion factors. 37 figs., 91 tabs.

  1. Monthly energy review, June 1998

    NONE

    1998-06-01

    The Monthly Energy Review (MER) presents an overview of the Energy Information Administration`s recent monthly energy statistics. The statistics cover the major activities of US production, consumption, trade, stocks, and prices for petroleum, natural gas, coal, electricity, and nuclear energy. Also included are international energy and thermal and metric conversion factors. 36 figs., 61 tabs.

  2. Monthly energy review, February 1999

    NONE

    1999-02-01

    The Monthly Energy Review (MER) presents an overview of the Energy Information Administration`s recent monthly energy statistics. The statistics cover the major activities of US production, consumption, trade, stocks, and prices for petroleum, natural gas, coal, electricity, and nuclear energy. Also included are international energy and thermal and metric conversion factors. 37 figs., 73 tabs.

  3. Monthly energy review, November 1998

    NONE

    1998-11-01

    The Monthly Energy Review (MER) presents an overview of the Energy Information Administration`s recent monthly energy statistics. The statistics cover the major activities of US production, consumption, trade, stocks, and prices for petroleum, natural gas, coal, electricity, and nuclear energy. Also included are international energy and thermal and metric conversion factors. 37 figs., 61 tabs.

  4. Monthly energy review, October 1998

    NONE

    1998-10-01

    The Monthly Energy Review (MER) presents an overview of the Energy Information Administration`s recent monthly energy statistics. The statistics cover the major activities of US production, consumption, trade, stocks, and prices for petroleum, natural gas, coal, electricity, and nuclear energy. Also included are international energy and thermal and metric conversion factors. 37 figs., 61 tabs.

  5. ULTRAPLATE 30 month management report

    Jensen, Jens Dahl

    2003-01-01

    In the period from month 24 to month 30 focus has been on the work-package 3 activities concerning optimisation of the newly developed ULTRAPLATE technology towards specific industrial applications. Three main application areas have been pursued: 1) High- speed plating of lead free solder contacts...

  6. Wayne Interim Storage Site annual environmental report for calendar year 1991, Wayne, New Jersey. [Wayne Interim Storage Site

    None

    1992-09-01

    This document describes the envirormental monitoring program at the Wayne Interim Storage Site (WISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of WISS and surrounding area began in 1984 when Congress added the site to the US Department of Energy's (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. WISS is a National Priorities List site. The environmental monitoring program at WISS includes sampling networks for radon and thoron concentrations in air; external gamma radiation exposure; and radium-226, radium-228, thorium-232, and total uranium concentrations in surface water, sediment, and groundwater. Several nonradiological parameters are also measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides, dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.

  7. Maywood Interim Storage Site annual environmental report for calendar year 1991, Maywood, New Jersey. [Maywood Interim Storage Site

    None

    1992-09-01

    This document describes the environmental monitoring program at the Maywood Interim Storage Site (MISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of MISS began in 1984 when congress added the site to the US Department of Energy's (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at MISS includes sampling networks for radon and thoron concentrations in air; external gamma radiation-exposure; and total uranium, radium-226, radium-228, thorium-232, and thorium-230 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.

  8. Commentary: Interim leadership of academic departments at U.S. medical schools.

    Grigsby, R Kevin; Aber, Robert C; Quillen, David A

    2009-10-01

    Medical schools and teaching hospitals are experiencing more frequent turnover of department chairs. Loss of a department chair creates instability in the department and may have a negative effect on the organization at large. Interim leadership of academic departments is common, and interim chairs are expected to immediately demonstrate skills and leadership abilities. However, little is known about how persons are prepared to assume the interim chair role. Newer competencies for effective leadership include an understanding of the business of medicine, interpersonal and communication skills, the ability to deal with conflict and solve adaptive challenges, and the ability to build and work on teams. Medical schools and teaching hospitals need assistance to meet the unique training and support needs of persons serving as interim leaders. For example, the Association of American Medical Colleges and individual chair societies can develop programs to allow current chairs to reflect on their present positions and plan for the future. Formal leadership training, mentorship opportunities, and conscientious succession planning are good first steps in preparing to meet the needs of academic departments during transitions in leadership. Also, interim leadership experience may be useful as a means for "opening the door" to underrepresented persons, including women, and increasing the diversity of the leadership team.

  9. Long-term interim storage concepts with conditioning strategies ensuring compatibility with subsequent disposal or reprocessing

    Moitrier, C.; Tirel, I.; Villard, C.

    2000-01-01

    The objective of the CEA studies carried out under research topic 3 (long-term interim storage) of the 1991 French radioactive waste management law is to demonstrate the industrial feasibility of a comprehensive, flexible interim storage facility by thoroughly evaluating and comparing all the basic components of various interim storage concepts. In this context, the CEA is considering reference solutions or concepts based on three primary components (the package, the interim storage facility and the site) suitable for determining the specifications of a very long-term solution. Some aspects are examined in greater detail, such as the implementation of long-term technologies, conditioning processes ensuring the absence of water and contamination in the facility, or allowance for radioactive decay of the packages. The results obtained are continually compiled in reports substantiating the design options. These studies should also lead to an overall economic assessment in terms of the capital and operating cost requirements, thereby providing an additional basis for selecting the design options. The comparison with existing industrial facilities highlights the technical and economic progress represented by the new generation of interim storage units. (authors)

  10. Predictive probability methods for interim monitoring in clinical trials with longitudinal outcomes.

    Zhou, Ming; Tang, Qi; Lang, Lixin; Xing, Jun; Tatsuoka, Kay

    2018-04-17

    In clinical research and development, interim monitoring is critical for better decision-making and minimizing the risk of exposing patients to possible ineffective therapies. For interim futility or efficacy monitoring, predictive probability methods are widely adopted in practice. Those methods have been well studied for univariate variables. However, for longitudinal studies, predictive probability methods using univariate information from only completers may not be most efficient, and data from on-going subjects can be utilized to improve efficiency. On the other hand, leveraging information from on-going subjects could allow an interim analysis to be potentially conducted once a sufficient number of subjects reach an earlier time point. For longitudinal outcomes, we derive closed-form formulas for predictive probabilities, including Bayesian predictive probability, predictive power, and conditional power and also give closed-form solutions for predictive probability of success in a future trial and the predictive probability of success of the best dose. When predictive probabilities are used for interim monitoring, we study their distributions and discuss their analytical cutoff values or stopping boundaries that have desired operating characteristics. We show that predictive probabilities utilizing all longitudinal information are more efficient for interim monitoring than that using information from completers only. To illustrate their practical application for longitudinal data, we analyze 2 real data examples from clinical trials. Copyright © 2018 John Wiley & Sons, Ltd.

  11. Environmental Assessment and Finding of No Significant Impact: Interim Measures for the Mixed Waste Management Facility Groundwater at the Burial Ground Complex at the Savannah River Site

    N/A

    1999-12-08

    The U. S. Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts associated with the proposed interim measures for the Mixed Waste Management Facility (MW) groundwater at the Burial Ground Complex (BGC) at the Savannah River Site (SRS), located near Aiken, South Carolina. DOE proposes to install a small metal sheet pile dam to impound water around and over the BGC groundwater seepline. In addition, a drip irrigation system would be installed. Interim measures will also address the reduction of volatile organic compounds (VOCS) from ''hot-spot'' regions associated with the Southwest Plume Area (SWPA). This action is taken as an interim measure for the MWMF in cooperation with the South Carolina Department of Health and Environmental Control (SCDHEC) to reduce the amount of tritium seeping from the BGC southwest groundwater plume. The proposed action of this EA is being planned and would be implemented concurrent with a groundwater corrective action program under the Resource Conservation and Recovery Act (RCRA). On September 30, 1999, SCDHEC issued a modification to the SRS RCRA Part B permit that adds corrective action requirements for four plumes that are currently emanating from the BGC. One of those plumes is the southwest plume. The RCRA permit requires SRS to submit a corrective action plan (CAP) for the southwest plume by March 2000. The permit requires that the initial phase of the CAP prescribe a remedy that achieves a 70-percent reduction in the annual amount of tritium being released from the southwest plume area to Fourmile Branch, a nearby stream. Approval and actual implementation of the corrective measure in that CAP may take several years. As an interim measure, the actions described in this EA would manage the release of tritium from the southwest plume area until the final actions under the CAP can be implemented. This proposed action is expected to reduce the

  12. Modified glass ionomer and orthodontic band: An interim alternative for the treatment of molar incisor hypomineralization. A case report.

    Carla Orellana

    2017-03-01

    Full Text Available Introduction: Molar incisor hypomineralization (MIH is a developmental condition resulting in defects in the enamel characterized by demarcated opacities mainly affecting first permanent molars and occasionally permanent incisors in 1 of every 6 children worldwide. Affected molars have greater susceptibility to post eruptive breakdown, extensive caries and, in severe cases, are difficult to restore. When the MIH-affected molar presents severe crown destruction, it is necessary to perform an intermediate restoration to preserve the remaining dental structure in order to maintain occlusion, proper hygiene and periodontal health. The case of an 11-year-old patient with severe MIH is reported. The patient had extensive crown destruction by caries in tooth 1.6 without clinical or radiographic signs of pulp pathology. After an initial preventive intervention, enamel without dentin support and carious dentin were removed from tooth 1.6. Subsequently, crown restoration was performed with resin-modified glass ionomer, followed by the cementation of an orthodontic band. After 18 months of follow-up, the patient reported no pain or discomfort. The restoration was preserved intact, maintaining occlusal functionality, pulp and gingival health. Conclusion: The interim treatment, cementing an orthodontic band over a tooth restored with glass ionomer seems to favor retention and compressive strength, keeping the MIH-affected molar asymptomatic for at least 18 months. Further studies evaluating this treatment option in similar clinical situations are recommended.

  13. Survey of residential magnetic field sources interim report

    Dunlap, J.H.; Zaffanella, L.E.; Johnson, G.B.

    1993-01-01

    The Electric Power Research Institute (EPRI) has conducted a nationwide survey to collect engineering data on the sources and the levels of power frequency magnetic fields that exist in residences. The survey involves measurements at approximately 1,000 residences randomly selected in the service area of 25 utilities. The information in this paper contains data from approximately 700 homes measured. The goals of the survey are to identify all significant sources of 60 Hz magnetic field in residences, estimate with sufficient accuracy the fraction of residences in which magnetic field exceeds any specified level, determine the relation between field and source parameters, and characterize spatial and temporal variations and harmonic content of the field. The data obtained relate to the level of the 60 Hz magnetic field and the source of the field, and not to personal exposure to magnetic fields, which is likely to be different due to the activity patterns of people. Magnetic fields from electrical appliances were measured intentionally away from the influence of appliance fields, which is limited to an area close to the appliance. Special measuring techniques were used to determine how the field varied within the living space of the house and over a twenty-four hour period. The field from each source is expressed in terms of how frequently a given field level is exceeded. The following sources of 60 Hz residential magnetic fields were identified: electrical appliances, grounding system of residences, overhead and underground power distribution lines, overhead power transmission lines, ground connections at electrical subpanels, and special wiring situations. Data from the appliance measurements is in a report published by EPRI, open-quotes Survey of Residential Magnetic Field Sources - Interim Reportclose quotes, TR-100194, which also provides much more detailed information on all subjects outlined in this paper

  14. Basis for Interim Operation for Fuel Supply Shutdown Facility

    BENECKE, M.W.

    2003-01-01

    This document establishes the Basis for Interim Operation (BIO) for the Fuel Supply Shutdown Facility (FSS) as managed by the 300 Area Deactivation Project (300 ADP) organization in accordance with the requirements of the Project Hanford Management Contract procedure (PHMC) HNF-PRO-700, ''Safety Analysis and Technical Safety Requirements''. A hazard classification (Benecke 2003a) has been prepared for the facility in accordance with DOE-STD-1027-92 resulting in the assignment of Hazard Category 3 for FSS Facility buildings that store N Reactor fuel materials (303-B, 3712, and 3716). All others are designated Industrial buildings. It is concluded that the risks associated with the current and planned operational mode of the FSS Facility (uranium storage, uranium repackaging and shipment, cleanup, and transition activities, etc.) are acceptable. The potential radiological dose and toxicological consequences for a range of credible uranium storage building have been analyzed using Hanford accepted methods. Risk Class designations are summarized for representative events in Table 1.6-1. Mitigation was not considered for any event except the random fire event that exceeds predicted consequences based on existing source and combustible loading because of an inadvertent increase in combustible loading. For that event, a housekeeping program to manage transient combustibles is credited to reduce the probability. An additional administrative control is established to protect assumptions regarding source term by limiting inventories of fuel and combustible materials. Another is established to maintain the criticality safety program. Additional defense-in-depth controls are established to perform fire protection system testing, inspection, and maintenance to ensure predicted availability of those systems, and to maintain the radiological control program. It is also concluded that because an accidental nuclear criticality is not credible based on the low uranium enrichment

  15. High Temperature Materials Interim Data Qualification Report FY 2011

    Lybeck, Nancy

    2011-01-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program has established the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) to ensure that VHTR data are qualified for use, stored in a readily accessible electronic form, and analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the High Temperature Materials characterization data stream, the processing of these data within NDMAS, and reports the interim fiscal year (FY) 2011 qualification status of the data. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category assigned by the data generator. The High Temperature Materials data are being collected under the Nuclear Quality Assurance (NQA)-1 guidelines and will be qualified data. For NQA-1 qualified data, the qualification activities include: (1) capture testing to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing to confirm that the data are an accurate representation of the system or object being measured, and (3) documenting that the data were collected under an NQA-1 or equivalent Quality Assurance program. Currently, data from seven test series within the High Temperature Materials data stream have been entered into the NDMAS vault, including tensile tests, creep tests, and cyclic tests. Of the 5,603,682 records currently in the vault, 4,480,444 have been capture passed, and capture testing is in process for the remaining 1,123,238.

  16. Interim results from UO2 fuel oxidation tests in air

    Campbell, T.K.; Gilbert, E.R.; Thornhill, C.K.; White, G.D.; Piepel, G.F.; Griffin, C.W.j.

    1987-08-01

    An experimental program is being conducted at Pacific Northwest Laboratory (PNL) to extend the characterization of spent fuel oxidation in air. To characterize oxidation behavior of irradiated UO 2 , fuel oxidation tests were performed on declad light-water reactor spent fuel and nonirradited UO 2 pellets in the temperature range of 135 to 250 0 C. These tests were designed to determine the important independent variables that might affect spent fuel oxidation behavior. The data from this program, when combined with the test results from other programs, will be used to develop recommended spent fuel dry-storage temperature limits in air. This report describes interim test results. The initial PNL investigations of nonirradiated and spent fuels identified the important testing variables as temperature, fuel burnup, radiolysis of the air, fuel microstructure, and moisture in the air. Based on these initial results, a more extensive statistically designed test matrix was developed to study the effects of temperature, burnup, and moisture on the oxidation behavior of spent fuel. Oxidation tests were initiated using both boiling-water reactor and pressurized-water reactor fuels from several different reactors with burnups from 8 to 34 GWd/MTU. A 10 5 R/h gamma field was applied to the test ovens to simulate dry storage cask conditions. Nonirradiated fuel was included as a control. This report describes experimental results from the initial tests on both the spent and nonirradiated fuels and results to date on the tests in a 10 5 R/h gamma field. 33 refs., 51 figs., 6 tabs

  17. Interim report of the task force on energy policy

    2001-01-01

    A Task Force was established by the Premier of British Columbia in August 2001 to draft an energy policy framework for the province. Based on best practices worldwide, and keeping in mind the specific energy needs of British Columbia, this framework aims at fostering energy development in British Columbia, in accordance with exemplary environmental practices. This interim report comprises the preliminary findings of the Task Force, and public input is sought before the final report is finalized and presented to government. The energy sector of British Columbia comprises hydroelectric power, oil, gas and coal resources. In addition, green energy and alternative energy technologies are being developed, such as wind, solar, and wave power, and hydrogen fuel cells. Industry and individual consumers are well served by the highly developed transmission and distribution systems for energy. Several strategic directions were identified by the Task Force for inclusion in the energy policy of British Columbia, to meet its full potential. They are: growth to ensure safe, reliable energy and take advantage of economic opportunities; diversification; competitiveness; industry restructuring and expansion; environmental imperative; government leadership; and community and First Nations' involvement. Some changes are also required for the continuing success of the energy sector in British Columbia: a move to fully competitive markets in the electricity system, the development of natural gas storage capacity in the Lower Mainland, additional considerations for coal use, and the development of alternative energy sources. It is expected that private capital and more energy supply will result from a fully competitive energy market, which in turn would lower energy costs. Jobs and income would increase as a result of the growth in the sector. Diversification makes good economic and environmental sense. tabs., figs

  18. PROJECT “5-100”: SOME INTERIM RESULTS

    Г А Ключарев

    2018-12-01

    Full Text Available The tasks of modernization and development of education and science are of a key im-portance for the Russian Federation. Despite a number of significant changes in the Russian system of education and science over the last 10-15 years, the best Russian universities still cannot compete with the world leading universities. In 2013, to change this situation the state started one of its most ambitious projects to increase the international competitiveness of Russian universities, which is the project “5-100”. Though the need for such projects for the development of science and education is widely acknowledged, the “5-100” has received contradictory estimates of different stakeholders and experts. By 2017, the project approached its half-time line and spent a significant part of its resources, thus, it is time to consider its interim results. Moreover, the today’s close attention to the project determined numerous speculations not only in the media but also in scientific articles aiming to assess the project’s impact on the Russian system of education and science based on ideological and political judgments. The authors understand and accept all informed judgments but emphasize the importance of evaluating both reasons for such large-scale projects and factors affecting their implementations. A superficial estimate of the project “5-100” leads to the em-phasis on its minor disadvantages, which usually hides its less obvious positive sides. Thus, the article focuses on the role of the project “5-100” in the modernization of the Russian system of education and science, considers its different aspects, and identifies possible approaches to assess its efficiency at the final stages of its implementation (or to develop new projects to increase the international competitiveness of Russian universities.

  19. Status of the Galileo interim radiation electron model

    Garrett, H. B.; Jun, I.; Ratliff, J. M.; Evans, R. W.; Clough, G. A.; McEntire, R. W.

    2003-04-01

    Measurements of the high energy, omni-directional electron environment by the Galileo spacecraft Energetic Particle Detector (EPD) were used to develop a new model of Jupiter's trapped electron radiation in the jovian equatorial plane for the range 8 to 16 Jupiter radii (1 jovian radius = 71,400 km). 10-minute averages of these data formed an extensive database of observations of the jovian radiation belts between Jupiter orbit insertion (JOI) in 1995 and 2002. These data were then averaged to provide a differential flux spectrum at 0.174, 0.304, 0.527, 1.5, 2.0, 11.0, and 31 MeV in the jovian equatorial plane as a function of radial distance. This omni-directional, equatorial model was combined with the original Divine model of jovian electron radiation to yield estimates of the out-of-plane radiation environment. That model, referred to here as the Galileo Interim Radiation Electron (or GIRE) model, was then used to calculate the Europa mission dose for an average and a 1-sigma worst-case situation. The prediction of the GIRE model is about a factor of 2 lower than the Divine model estimate over the range of 100 to 1000 mils (2.54 to 25.4 mm) of aluminum shielding, but exceeds the Divine model by about 50% for thicker shielding. The model, the steps leading to its creation, and relevant issues and concerns are discussed. While work remains to be done, the GIRE model clearly represents a significant step forward in the study of the jovian radiation environment, and it is a useful and valuable tool for estimating that environment for future space missions.

  20. LDEF materials: An overview of the interim findings

    Stein, B.A.

    1992-01-01

    The flight and retrieval of the National Aeronautics and Space Administration's Long Duration Exposure Facility (LDEF) provided an opportunity for the study of the low-Earth orbit (LEO) environment and long-duration space environmental effect (SEE) on materials that are unparalleled in the history of the U.S. space program. The 5.8-year flight of LDEF greatly enhanced the potential value of materials data from LDEF to the international SEE community, compared to that of the original 1-year flight plan. The remarkable flight attitude stability of LDEF enables specific analyses of various individual and combined effects of LEO environmental parameters on identical materials of the same space vehicle. NASA recognized the potential by forming the LDEF Space Environmental Effects on Materials Special Investigation Group (MSIG) to address the greatly expanded materials and LEO space environment parameter analysis opportunities available in the LDEF structure, experiment trays, and corollary measurements, so that the combined value of all LDEF materials data to current and future space missions will be assessed and documented. This paper provides an overview of the interim LDEF materials findings of the Principal Investigators and the Materials Special Investigation Group. These revelations are based on observations of LEO environmental effects on materials made in-space during LDEF retrieval and during LDEF tray deintegration at the Kennedy Space Center, and on findings of approximately 1.5 years of laboratory analyses of LDEF materials by the LDEF materials scientists. These findings were extensively reviewed and discussed at the MSIG-sponsored LDEF Materials Workshop '91. The results are presented in a format which categorizes the revelations as clear findings or confusing/unexplained findings and resultant needs for new space materials developments and ground simulation testing/analytical modeling

  1. E-Area Performance Assessment Interim Measures Assessment FY2005

    Stallings, M

    2006-01-31

    After major changes to the limits for various disposal units of the E-Area Low Level Waste Facility (ELLWF) last year, no major changes have been made during FY2005. A Special Analysis was completed which removes the air pathway {sup 14}C limit from the Intermediate Level Vault (ILV). This analysis will allow the disposal of reactor moderator deionizers which previously had no pathway to disposal. Several studies have also been completed providing groundwater transport input for future special analyses. During the past year, since Slit Trenches No.1 and No.2 were nearing volumetric capacity, they were operationally closed under a preliminary closure analysis. This analysis was performed using as-disposed conditions and data and showed that concrete rubble from the demolition of 232-F was acceptable for disposal in the STs even though the latest special analysis for the STs had reduced the tritium limits so that the inventory in the rubble exceeded limits. A number of special studies are planned during the next years; perhaps the largest of these will be revision of the Performance Assessment (PA) for the ELLWF. The revision will be accomplished by incorporating special analyses performed since the last PA revision as well as revising analyses to include new data. Projected impacts on disposal limits of more recent studies have been estimated. No interim measures will be applied during this year. However, it is being recommended that tritium disposals to the Components-in-Grout (CIG) Trenches be suspended until a limited Special Analysis (SA) currently in progress is completed. This SA will give recommendations for optimum placement of tritiated D-Area tower waste. Further recommendations for tritiated waste placement in the CIG Trenches will be given in the upcoming PA revision.

  2. Natural gas monthly, May 1997

    NONE

    1997-05-01

    The Natural Gas Monthly highlights activities, events, and analyses of interest to public and private sector organizations associated with the natural gas industry. Volume and price data are presented each month for natural gas production, distribution, consumption, and interstate pipeline activities. Producer-related activities and underground storage data are also reported. From time to time, the NGM features articles designed to assist readers in using and interpreting natural gas information. The feature article this month is ``Restructuring energy industries: Lessons from natural gas.`` 6 figs., 26 tabs.

  3. Natural gas monthly, June 1994

    1994-06-01

    The Natural Gas Monthly (NGM) highlights activities, events, and analyses of interest to public and private sector organizations associated with the natural gas industry. Volume and price data are presented each month for natural gas production, distribution, consumption, and interstate pipeline activities. Producer-related activities and underground storage data are also reported. From time to time, the NGM features articles designed to assist readers in using and interpreting natural gas information. The feature article this month is the executive summary from Natural Gas 1994: Issues and Trends. 6 figs., 31 tabs.

  4. Your Baby's Growth: 12 Months

    ... Safe Videos for Educators Search English Español Your Baby's Growth: 12 Months KidsHealth / For Parents / Your Baby's ... doubled his or her birth weight. Is My Baby Growing Normally? Babies' growth begins to slow as ...

  5. Developmental milestones record - 4 months

    ... are expected to develop certain physical and mental skills. These skills are called milestones. Information All children develop a ... your child's health care provider. PHYSICAL AND MOTOR SKILLS The typical 4-month-old baby should: Slow ...

  6. Your Child's Development: 1 Month

    ... Child’s Development: 1 Month Print en español El desarrollo de su hijo: 1 mes Have you ever ... lying on the tummy, holds head up briefly Social and Emotional Development recognizes mother's voice when upset, ...

  7. Your Child's Development: 2 Months

    ... Child's Development: 2 Months Print en español El desarrollo de su hijo: 2 meses Your baby develops ... pose) fists remain unclenched half of the time Social and Emotional Development comforts himself or herself, maybe ...

  8. Your Child's Development: 6 Months

    ... Child's Development: 6 Months Print en español El desarrollo de su hijo: 6 meses Notice your baby ... both ways (back to front, front to back) Social and Emotional Development recognizes and responds happily to ...

  9. Your Child's Development: 15 Months

    ... Child's Development: 15 Months Print en español El desarrollo de su hijo: 15 meses Toddlers this age ... stacks three blocks scribbles with crayon on paper Social and Emotional Development begins to show preference for ...

  10. Monthly energy review, July 1997

    NONE

    1997-07-01

    This document presents an overview of recent monthly energy statistics. Activities covered include: U.S. production, consumption, trade, stock, and prices for petroleum, coal, natural gas, electricity, and nuclear energy.

  11. Developmental milestones record - 12 months

    ... to 2 naps during the day SENSORY AND COGNITIVE DEVELOPMENT The typical 12-month-old: Begins pretend play ( ... Editorial team. Infant and Newborn Development Read more Toddler Development Read more NIH MedlinePlus Magazine Read more A. ...

  12. Developmental milestones record - 18 months

    ... The typical 18-month-old: Shows affection Has separation anxiety Listens to a story or looks at pictures Can say 10 or more words when asked Kisses parents with lips puckered Identifies one or more parts ...

  13. Monthly energy review, May 1990

    1990-01-01

    This document is a monthly report of Energy Information Administration on production, consumption, stocks, imports, and prices of the principal energy commodities in the United States. International energy data is also presented. 47 figs., 67 tabs

  14. 49 CFR 37.169 - Interim requirements for over-the-road bus service operated by private entities.

    2010-10-01

    ... of such devices, shall be permitted in the passenger compartment. When the bus is at rest at a stop... 49 Transportation 1 2010-10-01 2010-10-01 false Interim requirements for over-the-road bus service... Interim requirements for over-the-road bus service operated by private entities. (a) Private entities...

  15. Immobilized High-Level Waste (HLW) Interim Storage Alternative Generation and analysis and Decision Report - second Generation Implementing Architecture

    CALMUS, R.B.

    2000-01-01

    Two alternative approaches were previously identified to provide second-generation interim storage of Immobilized High-Level Waste (IHLW). One approach was retrofit modification of the Fuel and Materials Examination Facility (FMEF) to accommodate IHLW. The results of the evaluation of the FMEF as the second-generation IHLW interim storage facility and subsequent decision process are provided in this document

  16. Hazardous waste management programs; Florida: authorization for interim authorization phase I--Environmental Protection Agency. Notice of final determination.

    1982-05-07

    The State of Florida has applied for interim Authorization Phase I. EPA has reviewed Florida's application for Phase I and has determined that Florida's hazardous waste program is substantially equivalent to the Federal program covered by Phase I. The State of Florida is, hereby, granted Interim Authorization for Phase I to operate the State 's hazardous waste program, in lieu of the Federal program.

  17. 75 FR 13484 - Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA...

    2010-03-22

    ... DEPARTMENT OF COMMERCE [Docket T-1-2010] Foreign-Trade Zones Board Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA, Inc. (Cell Phones); Notice of.../ interim manufacturing (T/IM) authority, on behalf of LG Electronics Mobilecomm USA, Inc. (LGEMU), to...

  18. 33 CFR 96.360 - Interim Safety Management Certificate: what is it and when can it be used?

    2010-07-01

    ...? § 96.360 Interim Safety Management Certificate: what is it and when can it be used? (a) A responsible... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Interim Safety Management Certificate: what is it and when can it be used? 96.360 Section 96.360 Navigation and Navigable Waters COAST...

  19. 75 FR 7591 - Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and...

    2010-02-22

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-SFUND-2009-0907; FRL-9114-6] RIN 2050-ZA05 Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites; Extension of... Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response...

  20. 75 FR 43329 - Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Internal...

    2010-07-23

    ... 45 CFR Part 147 Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to... Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Internal Claims and... of Labor; Office of Consumer Information and Insurance Oversight, Department of Health and Human...

  1. 77 FR 34935 - Foreign-Trade Zone 161; Temporary/Interim Manufacturing Authority; Siemens Energy, Inc., (Wind...

    2012-06-12

    ... DEPARTMENT OF COMMERCE Foreign-Trade Zones Board [Docket T-4-2012] Foreign-Trade Zone 161; Temporary/Interim Manufacturing Authority; Siemens Energy, Inc., (Wind Turbine Nacelles and Hubs); Notice of... temporary/interim manufacturing (T/IM) authority, on behalf of Siemens Energy, Inc., to manufacture wind...

  2. Administrative Court Stade, decision of March 22, 1985 (interim storage facility at Gorleben)

    Anon.

    1985-01-01

    This decision deals with the planned interim storage facility of Gorleben (F.R.G.). The provisions introduced by the 4th ammendment to sec. 5 para. 6 and 9a to 9c of the German Atomic Energy Act might contain a definite regulation of the 'Entsorgung' of nuclear power stations. Sec. 6 of the Atomic Energy Act is not applicable to interim storage facilities because irradiated nuclear fuel has a double nature: It is spent fuel and nuclear waste as well. Considering current licensing procedures of construction and operation of nuclear installations in the field of 'Entsorgung', special legal regulations for the construction and operation of an interim storage facility have to be required. (CW)

  3. Development of Accident Scenario for Interim Spent Fuel Storage Facility Based on Fukushima Accident

    Lee, Dongjin; Choi, Kwangsoon; Yoon, Hyungjoon; Park, Jungsu [KEPCO-E and C, Yongin (Korea, Republic of)

    2014-05-15

    700 MTU of spent nuclear fuel is discharged from nuclear fleet every year and spent fuel storage is currently 70.9% full. The on-site wet type spent fuel storage pool of each NPP(nuclear power plants) in Korea will shortly exceed its storage limit. Backdrop, the Korean government has rolled out a plan to construct an interim spent fuel storage facility by 2024. However, the type of interim spent fuel storage facility has not been decided yet in detail. The Fukushima accident has resulted in more stringent requirements for nuclear facilities in case of beyond design basis accidents. Therefore, there has been growing demand for developing scenario on interim storage facility to prepare for beyond design basis accidents and conducting dose assessment based on the scenario to verify the safety of each type of storage.

  4. THE IMPORTANCE OF FINANCIAL INTERIM REPORTING FOR THE POSITION OF COMPANIES

    Claudia‐Elena\tGRIGORAȘ‐ICHIM

    2015-12-01

    Full Text Available The importance that each company must grant to the strategic sources of information generates our concern for analysis of the interim financial reporting. In every enterprise, there are doubts on the usefulness of interim financial reports, given the following elements: the necessary time for their preparation (relatively long, their restricted character and the resources necessary to establish them. Finding a common solution to these problems and, implicitly, increasing the interest for interim financial reporting, can help to increase the economic performance of the company, either by reducing the unnecessary costs related to time, or by increasing communication and transparency with third parties. An appropriate management can act early in the direction of counteracting the negative effects in their company or prevention of any commercial or production failures, the overall economic trends in that field and increasing productivity. Starting from these premises, we propose a research in order to capture the main aspects related to the mentioned issues.

  5. Using ERA-Interim reanalysis for creating datasets of energy-relevant climate variables

    Jones, Philip D.; Harpham, Colin; Troccoli, Alberto; Gschwind, Benoit; Ranchin, Thierry; Wald, Lucien; Goodess, Clare M.; Dorling, Stephen

    2017-07-01

    The construction of a bias-adjusted dataset of climate variables at the near surface using ERA-Interim reanalysis is presented. A number of different, variable-dependent, bias-adjustment approaches have been proposed. Here we modify the parameters of different distributions (depending on the variable), adjusting ERA-Interim based on gridded station or direct station observations. The variables are air temperature, dewpoint temperature, precipitation (daily only), solar radiation, wind speed, and relative humidity. These are available on either 3 or 6 h timescales over the period 1979-2016. The resulting bias-adjusted dataset is available through the Climate Data Store (CDS) of the Copernicus Climate Change Data Store (C3S) and can be accessed at present from climate.copernicus.eu" target="_blank">ftp://ecem.climate.copernicus.eu. The benefit of performing bias adjustment is demonstrated by comparing initial and bias-adjusted ERA-Interim data against gridded observational fields.

  6. Environmental assessment for 881 Hillside (High Priority Sites) interim remedial action

    1990-01-01

    This Environmental Assessment evaluates the impact of an interim remedial action proposed for the High Priority Sites (881 Hillside Area) at the Rocky Flats Plant (RFP). This interim action is to be conducted to minimize the release of hazardous substances from the 881 Hillside Area that pose a potential long-term threat to public health and the environment. This document integrates current site characterization data and environmental analyses required by the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or ''Superfund'' process, into an environmental assessment pursuant to the National Environmental Policy Act (NEPA). Characterization of the 881 Hillside Area is continuing. Consequently, a final remedial action has not yet been proposed. Environmental impacts associated with the proposed interim remedial action and reasonable alternatives designed to remove organic and inorganic contaminants, including radionuclides, from alluvial groundwater in the 881 Hillside Area are addressed. 24 refs., 5 figs., 23 tabs

  7. An allowable cladding peak temperature for spent nuclear fuels in interim dry storage

    Cha, Hyun-Jin; Jang, Ki-Nam; Kim, Kyu-Tae

    2018-01-01

    Allowable cladding peak temperatures for spent fuel cladding integrity in interim dry storage were investigated, considering hydride reorientation and mechanical property degradation behaviors of unirradiated and neutron irradiated Zr-Nb cladding tubes. Cladding tube specimens were heated up to various temperatures and then cooled down under tensile hoop stresses. Cool-down specimens indicate that higher heat-up temperature and larger tensile hoop stress generated larger radial hydride precipitation and smaller tensile strength and plastic hoop strain. Unirradiated specimens generated relatively larger radial hydride precipitation and plastic strain than did neutron irradiated specimens. Assuming a minimum plastic strain requirement of 5% for cladding integrity maintenance in interim dry storage, it is proposed that a cladding peak temperature during the interim dry storage is to keep below 250 °C if cladding tubes are cooled down to room temperature.

  8. Natural gas monthly, October 1998

    NONE

    1998-10-01

    The Natural Gas Monthly (NGM) highlights activities, events, and analyses of interest to public and private sector organizations associated with the natural gas industry. Volume and price data are presented each month for natural gas production, distribution, consumption, and interstate pipeline activities. Producer-related activities and underground storage data are also reported. From time to time, the NGM features articles designed to assist readers in using and interpreting natural gas information. 6 figs., 27 tabs.

  9. Natural gas monthly, May 1999

    NONE

    1999-05-01

    The Natural Gas Monthly (NGM) highlights activities, events, and analyses of interest to public and private sector organizations associated with the natural gas industry. Volume and price data are presented each month for natural gas production, distribution, consumption, and interstate pipeline activities. Producer-related activities and underground storage data are also reported. From time to time the NGM features articles designed to assist readers in using and interpreting natural gas information. 6 figs., 27 tabs.

  10. Natural gas monthly, June 1998

    NONE

    1998-06-01

    The Natural Gas Monthly (NGM) highlights activities, events, and analyses of interest to public and private sector organizations associated with the natural gas industry. Volume and price data are presented each month for natural gas production, distribution, consumption, and interstate pipeline activities. Producer-related activities and underground storage data are also reported. From time to time, the NGM features articles designed to assist readers in using and interpreting natural gas information. 6 figs., 27 tabs.

  11. Monthly energy review, April 1999

    NONE

    1999-04-01

    The Monthly Energy Review (MER) presents an overview of the Energy Information Administration`s recent monthly energy statistics. The statistics cover the major activities of US production, consumption, trade, stocks, and prices for petroleum, natural gas, coal, electricity, and nuclear energy. Also included are international energy and thermal and metric conversion factors. The MER is intended for use by Members of Congress, Federal and State agencies, energy analysts, and the general public.

  12. Electric Power Monthly, March 1991

    1991-01-01

    The Electric Power Monthly (EPM) presents monthly summaries of electric utility statistics at the national, Census division, and state level. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data are presented on generation, fuel consumption, stockpiles, costs, sales, and unusual occurrences. Fuels considered are: coal, petroleum, natural gas, nuclear power, and hydroelectric power. 4 figs., 48 tabs

  13. Monthly energy review, August 1998

    NONE

    1998-08-01

    The Monthly Energy Review (MER) presents an overview of the Energy Information Administration`s recent monthly energy statistics. The statistics cover the major activities of US production, consumption, trade, stocks, and prices for petroleum, natural gas, coal, electricity, and nuclear energy. Also included are international energy and thermal and metric conversion factors. The MER is intended for use by Members of Congress, Federal and State agencies, energy analysts, and the general public. 37 figs., 73 tabs.

  14. Natural gas monthly, August 1994

    1994-08-24

    The Natural Gas Monthly (NGM) highlights activities, events, and analyses of interest to public and private sector organizations associated with the natural gas industry. Volume and price data are presented each month for natural gas production, distribution, consumption, and interstate pipeline activities. Producer-related activities and underground storage data are also reported. From time to time, the NGM features articles designed to assist readers in using and interpreting natural gas information.

  15. Natural gas monthly, November 1993

    1993-01-01

    The Natural Gas Monthly (NGM) highlights activities, events, and analyses of interest to public and private sector organizations associated with the natural gas industry. Volume and price data are presented each month for natural gas production, distribution, consumption, and interstate pipeline activities. Producer-related activities and underground state data are also reported. From time to time, the NGM features articles designed to assist readers in using and interpreting natural gas information

  16. Hanford Works monthly report, October 1952

    1952-11-20

    this document presents a summary of work and progress at the Hanford Engineer works for October 1952. The report is divided into sections by department. A plant wide general summary is included at the beginning of the report, after which the departmental summaries begin. The Manufacturing Department reports plant statistics, and summaries for the Metal Preparation, Reactor and Separation sections. The Engineering Department`s section summaries work for the Technical, Design, and Project Sections. Costs for the various departments are presented in the Financial Department`s summary. The Medical, Radiological Sciences, Utilities and General Services, Employee and Public Relations, and Community Real Estate and Services departments have sections presenting their monthly statistics, work, progress, and summaries.

  17. Hanford Works monthly report, February 1953

    1953-03-18

    This document presents a summary of work and progress at the Hanford Engineer Works for February 1953. The report is divided into sections by department. A plant wide general summary is included at the beginning of the report, after which the departmental summaries begin. The Manufacturing Department reports plant statistics, and summaries for the Metal Preparation, Reactor and Separation sections. The Engineering Department`s section summaries work for the Technical, Design, and Project Sections. Costs for the various departments are presented in the Financial Department`s summary. The Medical, Radiological Sciences, Utilities and General Services, Employee and Public Relations, and Community Real Estate and Service departments have sections presenting their monthly statistics, work, progress, and summaries.

  18. Hanford Works monthly report, August 1952

    1952-09-24

    This document presents a summary of work and progress at the Hanford Engineer Works for August 1952. The report is divided into sections by department. A plant wide general summary is included at the beginning of the report, after which the departmental summaries begin. The Manufacturing Department reports plant statistics, and summaries for the Metal Preparation, Reactor and Separation sections. The Engineering Department` section summaries work for the Technical, Design, and Project Sections. Costs for the various departments are presented in the Financial Department`s summary. The Medical,Radiological Sciences, Utilities and General Services, Employee and Public Relations, and Community Real Estate and Services departments have sections presenting their monthly statistics, work, progress, and summaries.

  19. Hanford Works monthly report, September 1952

    1952-10-20

    This document presents a summary of work and progress at the Hanford Engineer Works for September 1952. The report is divided into sections by department. A plant wide general summary is included at the beginning of the report, after which the departmental summaries begin. The Manufacturing Department reports plant statistics, and summaries for the Metal Preparation, Reactor and Separation sections. The Engineering Department`s section summaries work for the Technical Design, and Project Sections. Costs for the various departments are presented in the Financial Department`s summary. The Medical, Radiological Sciences, Utilities and General Services, Employee and Public Relations, and Community Real Estate and Services departments have sections presenting their monthly statistics, work, progress, and summaries.

  20. Hanford Works monthly report, October 1951

    1951-11-21

    This document presents a summary of work and progress at the Hanford Engineer Works for October 1951. The report is divided into sections by department. A plant wide general summary is included at the beginning of the report, after which the departmental summaries begin. The Manufacturing Department reports plant statistics, and summaries for the Metal Preparation, Reactor and Separation sections. The Engineering Department`s section summarizes work for the Technical Design, and Project Sections. Costs for the various departments are presented in the Financial Department`s summary. The Medical, Radiological Sciences, Utilities and General Services, Employee and Public Relations, and Community Real Estate and Services departments have sections presenting their monthly statistics, work, progress, and summaries.

  1. Hanford Works monthly report, December 1952

    1953-01-23

    This document presents a summary of work and progress at the Hanford Engineer Works for December 1952. The report is divided into sections by department. A plant wide general summary is included at the beginning of the report, after which the departmental summaries begin. The Manufacturing Department reports plant statistics, and summaries for the Metal Preparation, Reactor and Separation sections. The Engineering Department`s section summarizes work for the Technical, Design, and Project Sections. Costs for the various departments are presented in the Financial Department`s summary. The Medical, Radiological Sciences, Utilities and General Services, Employee and Public Relations, and Community Real Estate and Services departments have sections presenting their monthly statistics, work, progress, and summaries.

  2. New metals

    Bergqvist, U.

    1983-12-01

    The aim of this report is to estimate the exposure to various metals and metal compounds and discuss the available information of the possible toxic effects of these metals and compounds. In the first section, some metals are defined as those with either a large or a fast increasing exposure to living organisms. The available information on toxicity is discussed in the second section. In the third section interesting metals are defined as compounds having a large exposure and an apparent insufficient knowledge of their possible toxic effects. Comments on each of these metals are also to be found in the third section. (G.B.)

  3. 1987 Federal interim storage fee study: A technical and economic analysis

    1987-09-01

    This document is the latest in a series of reports that are published annually by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This information in the report, which was prepared by E.R. Johnson Associates under subcontract to PNL, will be used by the DOE to establish a payment schedule for interim storage of spent nuclear fuel under the Federal Interim Storage (FIS) Program, which was mandated by the Nuclear Waste Policy Act of 1982. The information in this report will be used to establish the schedule of charges for FIS services for the year commencing January 1, 1988. 13 tabs.

  4. Scientific criteria document for the development of an interim provincial water quality objective for aniline

    Angelow, R.V.; Bazinet, N.

    1996-11-01

    The purpose of this document is to develop an interim provincial water quality objective for aniline for the protection of aquatic life in Ontario. It reviews the sources of aniline in the environment, its environmental fate and properties, acute and chronic toxicity as determined from results reported in the literature on toxicity tests using vertebrates and invertebrates, the bioaccumulation of aniline in the environment, mutagenic effects, and threshold aniline concentrations affecting fish odour and taste. The document then explains the derivation of the interim water quality objective. Water quality criteria for aniline developed in other jurisdictions are noted.

  5. Early rehabilitation of facial defects using interim removable prostheses: A clinical case report

    Vivekanandhan Ramkumar

    2013-01-01

    Full Text Available Surgical resection of neoplasms or malformations of the face may result in defects that are not amenable to immediate surgical reconstruction. Such defects can have a severe adverse effect on patient perceptions of body image and self-esteem. In these cases, the use of an interim removable facial prosthesis can offer a rapid alternative treatment solution. The patient may then resume social interactions more comfortably while permitting easy access to the facial defect to observe tissue healing while awaiting definitive rehabilitation. This article presents a case report describing the use of interim nasal prostheses to provide rapid patient rehabilitation of facial defects.

  6. 1987 Federal interim storage fee study: A technical and economic analysis

    1987-09-01

    This document is the latest in a series of reports that are published annually by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This information in the report, which was prepared by E.R. Johnson Associates under subcontract to PNL, will be used by the DOE to establish a payment schedule for interim storage of spent nuclear fuel under the Federal Interim Storage (FIS) Program, which was mandated by the Nuclear Waste Policy Act of 1982. The information in this report will be used to establish the schedule of charges for FIS services for the year commencing January 1, 1988. 13 tabs

  7. In-situ storage: An approach to interim remedial action - recent case studies in Canada

    Zelmer, R.L.

    1991-01-01

    The Low-Level Radioactive Waste Management Office (LLRWMO) acts on behalf of the federal government to manage historic low-level radioactive wastes. Recent interim remedial work in the Town of Port Hope, Ontario has included the consolidation of radium and uranium contaminated soils into temporary storage facilities on two sites to await final disposal elsewhere. Simple containments constructed and sited on already contaminated sites have been found effective as part of an interim remedial strategy. The approach has been accepted and supported by the local public. Lessons have been learned from a project management, environmental remediation and engineering design point of view

  8. An exploratory study of the health harms and utilisation of health services of frequent legal high users under the interim regulated legal high market in central Auckland.

    Wilkins, Chris; Prasad, Jitesh; Wong, K C; Rychert, Marta; Graydon-Guy, Thomas

    2016-03-11

    To explore health problems and the accessing of health services by frequent legal high users under an interim regulated legal market in central Auckland. Frequent legal high users (monthly+) were recruited from outside eight randomly-selected, licensed, legal high stores in central Auckland from 23 April-7 May, 2014. Eligible participants were emailed a unique invitation to complete an on-line survey; 105 completed the survey. Twenty-seven percent had suffered mental illness during their lifetimes. Eighty percent used synthetic cannabinoids (SC), and 20% 'party pills'. Forty-seven percent of SC users used daily or more often. Other drugs used included alcohol (80%), cannabis (59%), 'ecstasy' (18%) and methamphetamine (15%). Fifty-eight percent of SC users were classified as SC dependent. The most common problems reported from SC use were: insomnia (29%); 'vomiting/nausea' (25%); 'short temper/agitation' (21%); 'anxiety' (21%); 'strange thoughts' (16%); and 'heart palpitations' (14%). The health services most commonly accessed by SC users were: a 'doctor/GP' (9%); 'counsellor' (9%); 'DrugHelp/MethHelp' websites (7%); 'Alcohol & Drug Helpline' (4%); 'ambulance' (3%); 'A&E' (3%); and hospitalisation (3%). Frequent use of interim licensed SC products was associated with health problems, including dependency. Further research is required to determine the health risks of these products.

  9. Randomized Clinical Trial Comparing Proton Beam Radiation Therapy with Transarterial Chemoembolization for Hepatocellular Carcinoma: Results of an Interim Analysis

    Bush, David A., E-mail: dbush@llu.edu [Department of Radiation Medicine, Loma Linda University Medical Center, Loma Linda, California (United States); Smith, Jason C. [Department of Diagnostic Radiology, Loma Linda University Medical Center, Loma Linda, California (United States); Slater, Jerry D. [Department of Radiation Medicine, Loma Linda University Medical Center, Loma Linda, California (United States); Volk, Michael L. [Transplantation Institute and Liver Center, Loma Linda University Medical Center, Loma Linda, California (United States); Reeves, Mark E. [VA Loma Linda Health Care System, Loma Linda, California (United States); Cheng, Jason [Transplantation Institute and Liver Center, Loma Linda University Medical Center, Loma Linda, California (United States); Grove, Roger [Department of Radiation Medicine, Loma Linda University Medical Center, Loma Linda, California (United States); Vera, Michael E. de [Transplantation Institute and Liver Center, Loma Linda University Medical Center, Loma Linda, California (United States)

    2016-05-01

    Purpose: To describe results of a planned interim analysis of a prospective, randomized clinical trial developed to compare treatment outcomes among patients with newly diagnosed hepatocellular carcinoma (HCC). Methods and Materials: Eligible subjects had either clinical or pathologic diagnosis of HCC and met either Milan or San Francisco transplant criteria. Patients were randomly assigned to transarterial chemoembolization (TACE) or to proton beam radiation therapy. Patients randomized to TACE received at least 1 TACE with additional TACE for persistent disease. Proton beam radiation therapy was delivered to all areas of gross disease to a total dose of 70.2 Gy in 15 daily fractions over 3 weeks. The primary endpoint was progression-free survival, with secondary endpoints of overall survival, local tumor control, and treatment-related toxicities as represented by posttreatment days of hospitalization. Results: At the time of this analysis 69 subjects were available for analysis. Of these, 36 were randomized to TACE and 33 to proton. Total days of hospitalization within 30 days of TACE/proton was 166 and 24 days, respectively (P<.001). Ten TACE and 12 proton patients underwent liver transplantation after treatment. Viable tumor identified in the explanted livers after TACE/proton averaged 2.4 and 0.9 cm, respectively. Pathologic complete response after TACE/proton was 10%/25% (P=.38). The 2-year overall survival for all patients was 59%, with no difference between treatment groups. Median survival time was 30 months (95% confidence interval 20.7-39.3 months). There was a trend toward improved 2-year local tumor control (88% vs 45%, P=.06) and progression-free survival (48% vs 31%, P=.06) favoring the proton beam treatment group. Conclusions: This interim analysis indicates similar overall survival rates for proton beam radiation therapy and TACE. There is a trend toward improved local tumor control and progression-free survival with proton beam. There are

  10. The Safety Assessment of Long term Interim Storage at Sellafield

    Buchan, Andrew B.

    2014-01-01

    that are most significant in terms of frequency and unmitigated potential consequences PSA looks at the full range of fault sequences and allows full incorporation of the reliability and failure probability of the safety measures and other features of the design and operations SAA considers significant but unlikely accidents where off-site consequences are likely to significantly affect the critical group and provides information on their progression, within the facility and also beyond the site boundary. The paper will illustrate how these techniques have been utilised to facilitate design, operation, resilience evaluation and accident management of facilities supporting long term interim storage at Sellafield. (author)

  11. Introducing Systematic Aging Management for Interim Storage Facilities in Germany

    Spieth-Achtnich, Angelika; Schmidt, Gerhard

    2014-01-01

    In Germany twelve at-reactor and three central (away from reactor) dry storage facilities are in operation, where the fuel is stored in combined transport-and-storage casks. The safety of the storage casks and facilities has been approved and is licensed for up to 40 years operating time. If the availability of a final disposal facility for the stored wastes (spent fuel and high-level wastes from reprocessing) will be further delayed the renewal of the licenses can become necessary in future. Since 2001 Germany had a regulatory guideline for at-reactor dry interim storage of spent fuel. In this guideline some elements of ageing were implemented, but no systematic approach was made for a state-of-the-art ageing management. Currently the guideline is updated to include all kind of storage facilities (central storages as well) and all kinds of high level waste (also waste from reprocessing). Draft versions of the update are under discussion. In these drafts a systematic ageing management is seen as an instrument to upgrade the available technical knowledge base for possible later regulatory decisions, should it be necessary to prolong storage periods to beyond the currently approved limits. It is further recognized as an instrument to prevent from possible and currently unrecognized ageing mechanisms. The generation of information on ageing can be an important basis for the necessary safety-relevant verifications for long term storage. For the first time, the demands for a systematic monitoring of ageing processes for all safety-related components of the storage system are described. In addition, for inaccessible container components such as the seal system, the neutron shielding, the baskets and the waste inventory, the development of a monitoring program is recommended. The working draft to the revised guideline also contains recommendations on non-technical ageing issues such as the long-term preservation of knowledge, long term personnel planning and long term

  12. Surface Water Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document for South Walnut Creek Basin (Operable Unit No. 2)

    1991-01-01

    The Department of Energy (DOE) is pursuing an Interim Measure/Interim Remedial Action (IM/IRA) at the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2) at the Rocky Flats Plant (RFP). This IM/IRA is to be conducted to minimize the release from these areas of hazardous substances that pose a potential threat to the public health and environment. The Plan involved the collection of contaminated surface water at specific locations, treatment by chemical precipitation, cross-flow membrane filtration and granular activated carbon (GAC) adsorption, and surface discharge of treated water. Information for the initial configuration of the Plan is presented in the document entitled ''Proposed Interim Measures/Interim Remedial Action Plan and Decision Document, 903 Pad, Mound, and East Trenches Areas, Operable Unit No. 2'' (IM/IRAP) dated 26 September 1990. Information concerning the proposed Surface Water IM/IRA was presented during a public meeting held from 7 to 10 p.m., Tuesday, 23 October 1990, at the Westminster City Park Recreation Center in Westminster, Colorado. This Responsiveness Summary presents DOE's response to all comments received at the public meeting, as well as those mailed to DOE during the public comment period which ended 24 November 1990. There were a number of technical comments on the plan that DOE has addressed herein. It is noted that several major issues were raised by the comments. Regardless of the estimated low risk to the public from construction and water transport activities, the popular sentiment of the public, based on comments received, is strong concern over worker and public health risks from these activities. In the light of public and municipal concerns, DOE proposes to eliminate from this IM/IRA the interbasin transfer of Woman Creek seepage to the South Walnut Creek drainage and to address collection and treatment of contaminated South Walnut Creek and Woman Creek surface water under two separate IM/IRAs

  13. Subsurface Interim Measures/Interim Remedial Action Plan and Decision Document for the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2)

    1992-01-01

    The Department of Energy (DOE) is pursuing an Interim Measure/Interim Remedial Action (IM/IRA) at the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2) at the Rocky Flats Plant (RFP). This MIRA is to be conducted to provide information that will aid in the selection and design of final remedial actions at OU2 that will address removal of suspected free-phase volatile organic compound (VOC) contamination. The Plan involves investigating the removal of residual free-phase VOCs by in situ vacuum-enhanced vapor extraction technology at 3 suspected VOC source areas within OU2. VOC-contaminated vapors extracted from the subsurface would be treated by granular activated carbon (GAC) adsorption and discharged. The Plan also includes water table depression, when applicable at the test sites, to investigate the performance of vapor extraction technology in the saturated zone. The Plan provides for treatment of any contaminated ground water recovered during the IM/IRA at existing RFP treatment facilities. The proposed MVIRA Plan is presented in the document entitled ''Proposed Subsurface Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document, 903 Pad, Mound, and East Trenches Areas, Operable Unit No. 2, '' dated 20 March 1992. Information concerning the proposed Subsurface IM/IRA was presented during a DOE Quarterly Review meeting held on 07 April 1992 and a public meeting held on 07 May 1992, at the Marriott Hotel in Golden, Colorado. The Responsiveness Summary presents DOE's response to all comments received at the public meeting, as well as those mailed to date to DOE during the public comment period

  14. Silicone metalization

    Maghribi, Mariam N. (Livermore, CA); Krulevitch, Peter (Pleasanton, CA); Hamilton, Julie (Tracy, CA)

    2008-12-09

    A system for providing metal features on silicone comprising providing a silicone layer on a matrix and providing a metal layer on the silicone layer. An electronic apparatus can be produced by the system. The electronic apparatus comprises a silicone body and metal features on the silicone body that provide an electronic device.

  15. Electric power monthly, May 1994

    1994-05-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. This publication provides monthly statistics for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Statistics by company and plant are published on the capability of new generating units, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fossil fuels.

  16. Electric power monthly, April 1994

    1994-04-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. This publication provides monthly statistics at the U.S., Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. This April 1994 issue contains 1993 year-end data and data through January 1994.

  17. Electric power monthly, August 1993

    1993-08-13

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The EPM is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions.

  18. Electric power monthly, September 1993

    1993-09-17

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The EPM is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions.

  19. Petroleum marketing monthly, May 1994

    1994-05-26

    The Petroleum Marketing Monthly (PMM) provides information and statistical data on a variety of crude oils and refined petroleum products. The publication presents statistics on crude oil costs and refined petroleum products sales for use by industry, government, private sector analysts, educational institutions, and consumers. Data on crude oil include the domestic first purchase price, the f.o.b. and landed cost of imported crude oil, petroleum product sales data include motor gasoline, distillates, residuals, aviation fuels, kerosene, and propane. The Petroleum Marketing Division, Office of Oil and Gas, Energy Information Administration ensures the accuracy, quality, and confidentiality of the published data in the Petroleum Marketing Monthly.

  20. Natural gas monthly, April 1999

    NONE

    1999-05-06

    The Natural Gas Monthly (NGM) highlights activities, events, and analyses of interest to public and private sector organizations associated with the natural gas industry. Volume and price data are presented each month for natural gas production, distribution, consumption, and interstate pipeline activities. Producer-related activities and underground storage data are also reported. From time to time, the NGM features articles designed to assist readers in using and interpreting natural gas information. There are two feature articles in this issue: Natural gas 1998: Issues and trends, Executive summary; and Special report: Natural gas 1998: A preliminary summary. 6 figs., 28 tabs.

  1. Electric power monthly, April 1993

    1993-05-07

    The Electric Power Monthly is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions.

  2. Electric power monthly, June 1994

    1994-06-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended.

  3. Electric power monthly, August 1994

    1994-08-24

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended.

  4. Monthly energy review, June 1999

    NONE

    1999-06-01

    The Monthly Energy Review (MER) presents an overview of the Energy Information Administration`s recent monthly energy statistics. The statistics cover the major activities of US production, consumption, trade, stocks, and prices for petroleum, natural gas, coal, electricity, and nuclear energy. Also included are international energy and thermal and metric conversion factors. The MER is intended for use by Members of Congress, Federal and State agencies, energy analysts, and the general public. EIA welcomes suggestions from readers regarding data series in the MER and in other EIA publications. 37 figs., 61 tabs.

  5. Monthly energy review, July 1999

    NONE

    1999-07-01

    The Monthly Energy Review (MER) presents an overview of the Energy Information Administration`s recent monthly energy statistics. The statistics cover the major activities of US production, consumption, trade, stocks, and prices for petroleum, natural gas, coal, electricity, and nuclear energy. Also included are international energy and thermal and metric conversion factors. The MER is intended for use by Members of Congress, Federal and State agencies, energy analysts, and the general public. EIA welcomes suggestions from readers regarding data series in the MER and in other EIA publications. 37 figs., 75 tabs.

  6. Natural gas monthly, August 1993

    1993-08-25

    The Natural Gas Monthly (NGM) is prepared in the Data Operations Branch of the Reserves and Natural Gas Division, Office of Oil and Gas, Energy Information Administration (EIA), US Department of Energy (DOE). The NGM highhghts activities, events, and analyses of interest to public and private sector organizations associated with the natural gas industry. Volume and price data are presented each month for natural gas production, distribution, consumption, and interstate pipeline activities. Producer-related activities and underground storage data are also reported. From time to time, the NGM features articles designed to assist readers in using and interpreting natural gas information.

  7. Electric power monthly, May 1993

    1993-05-25

    The Electric Power Monthly (EPM) is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions.

  8. Electric power monthly, July 1993

    1993-07-29

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended.

  9. Electric power monthly, November 1994

    1994-11-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended

  10. Quantitative analyses at baseline and interim PET evaluation for response assessment and outcome definition in patients with malignant pleural mesothelioma

    Lopci, Egesta; Chiti, Arturo [Humanitas Research Hospital, Nuclear Medicine Department, Rozzano, Milan (Italy); Zucali, Paolo Andrea; Perrino, Matteo; Gianoncelli, Letizia; Lorenzi, Elena; Gemelli, Maria; Santoro, Armando [Humanitas Research Hospital, Oncology, Rozzano (Italy); Ceresoli, Giovanni Luca [Humanitas Gavazzeni, Oncology, Bergamo (Italy); Giordano, Laura [Humanitas Research Hospital, Biostatistics, Rozzano (Italy)

    2015-04-01

    Quantitative analyses on FDG PET for response assessment are increasingly used in clinical studies, particularly with respect to tumours in which radiological assessment is challenging and complete metabolic response is rarely achieved after treatment. A typical example is malignant pleural mesothelioma (MPM), an aggressive tumour originating from mesothelial cells of the pleura. We present our results concerning the use of semiquantitative and quantitative parameters, evaluated at the baseline and interim PET examinations, for the prediction of treatment response and disease outcome in patients with MPM. We retrospectively analysed data derived from 131 patients (88 men, 43 women; mean age 66 years) with MPM who were referred to our institution for treatment between May 2004 and July 2013. Patients were investigated using FDG PET at baseline and after two cycles of pemetrexed-based chemotherapy. Responses were determined using modified RECIST criteria based on the best CT response after treatment. Disease control rate, progression-free survival (PFS) and overall survival (OS) were calculated for the whole population and were correlated with semiquantitative and quantitative parameters evaluated at the baseline and interim PET examinations; these included SUV{sub max}, total lesion glycolysis (TLG), percentage change in SUV{sub max} (ΔSUV{sub max}) and percentage change in TLG (ΔTLG). Disease control was achieved in 84.7 % of the patients, and median PFS and OS for the entire cohort were 7.2 and 14.3 months, respectively. The log-rank test showed a statistically significant difference in PFS between patients with radiological progression and those with partial response (PR) or stable disease (SD) (1.8 vs. 8.6 months, p < 0.001). Baseline SUV{sub max} and TLG showed a statistically significant correlation with PFS and OS (p < 0.001). In the entire population, both ΔSUV{sub max} and ΔTLG were correlated with disease control based on best CT response (p < 0

  11. Do constructed wetlands remove metals or increase metal bioavailability?

    Xu, Xiaoyu; Mills, Gary L

    2018-07-15

    The H-02 wetland was constructed to treat building process water and storm runoff water from the Tritium Processing Facility on the Department of Energy's Savannah River Site (Aiken, SC). Monthly monitoring of copper (Cu) and zinc (Zn) concentrations and water quality parameters in surface waters continued from 2014 to 2016. Metal speciation was modeled at each sampling occasion. Total Cu and Zn concentrations released to the effluent stream were below the NPDES limit, and the average removal efficiency was 65.9% for Cu and 71.1% for Zn. The metal-removal processes were found out to be seasonally regulated by sulfur cycling indicated by laboratory and model results. High temperature, adequate labile organic matter, and anaerobic conditions during the warm months (February to August) favored sulfate reduction that produced sulfide minerals to significantly remove metals. However, the dominant reaction in sulfur cycling shifted to sulfide oxidation during the cool months (September to next March). High concentrations of metal-organic complexes were observed, especially colloidal complexes of metal and fulvic acid (FA), demonstrating adsorption to organic matter became the primary process for metal removal. Meanwhile, the accumulation of metal-FA complexes in the wetland system will cause negative effects to the surrounding environment as they are biologically reactive, highly bioavailable, and can be easily taken up and transferred to ecosystems by trophic exchange. Copyright © 2018 Elsevier Ltd. All rights reserved.

  12. Interim Storage Facility for LLW of Decommissioning Nuclear Research Facilities

    Amato, S.; Ugolini, D.; Basile, F. [European Commission, Joint Research Centre, Nuclear Decommissioning and Facility Management Unit, TP 800, Via E. Fermi 2749, 21027 Ispra - VA (Italy)

    2009-06-15

    JRC-Ispra has initiated a Decommissioning and Waste Management (D and WM) Programme of all its nuclear facilities. In the frame of this programme, it has been decided to build an interim storage facility to host conditioned low level waste (LLW) that had been produced during the operation of JRC-Ispra nuclear research reactors and laboratories and that will be produced from their decommissioning. This paper presents the main characteristics of the facility. The storage ISFISF has a rectangular shape with uniform height and it is about 128 m long, 41 m wide and 9 m high. The entire surface affected by the facility, including screening area and access roads, is about 27.000 m{sup 2}. It is divided in three sectors, a central one, about 16 m long, for loading/unloading operations and operational services and two lateral sectors, each about 55 m long, for the conditioned LLW storage. Each storage sector is divided by a concrete wall in two transversal compartments. The ISFISF, whose operational lifetime is 50 years, is designed to host the conditioned LLW boxed in UNI CP-5.2 packages, 2,5 m long, 1.65 m wide, and 1,25 m high. The expected nominal inventory of waste is about 2100 packages, while the maximum storage is 2540 packages, thus a considerably large reserve capacity is available. The packages will be piled in stacks of maximum number of five. The LLW is going to be conditioned with a cement matrix. The maximum weight allowed for each package has been fixed at 16.000 kg. The total radioactivity inventory of waste to be hosted in the facility is about 30 TBq (mainly {beta}/{gamma} emitters). In order to satisfy the structural, seismic, and, most of all, radiological requirements, the external walls of the ISFISF are made of pre-fabricated panels, 32 cm thick, consisting of, from inside to outside, 20 cm of reinforced concrete, 7 cm of insulating material, and again 5 cm of reinforced concrete. For the same reason the roof is made with pre-fabricated panels in

  13. Hepatitis Awareness Month PSA (:30)

    2011-05-11

    May is National Hepatitis Awareness Month. This 30 second PSA discusses hepatitis and encourages listners to talk to their health care professional about getting tested.  Created: 5/11/2011 by National Center for HIV/AIDS, Viral Hepatitis, STD, and TB Prevention.   Date Released: 5/11/2011.

  14. Monthly energy review, June 1990

    1990-09-26

    The Monthly Energy Review presents current data on production, consumption, stocks, imports, exports, and prices of the principal energy commodities in the United States. Also included are data on international production of crude oil, consumption of petroleum products, petroleum stocks, and production of electricity from nuclear-powered facilities.

  15. Electric Power Monthly, July 1990

    1990-10-12

    The Electric Power Monthly (EPM) is prepared by the Electric Power Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the national, Census division, and State levels for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, cost of fuel, electricity sales, and average revenue per kilowatthour of electricity sold. Data on net generation are also displayed at the North American Electric Reliability Council (NERC) region level. Additionally, company and plant level information are published in the EPM on capability of new plants, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost in fuel. Quantity, quality, and cost of fuel data lag the net generation, fuel consumption, fuel stocks, electricity sales, and average revenue per kilowatthour data by 1 month. This difference in reporting appears in the national, Census division, and State level tables. However, at the plant level, all statistics presented are for the earlier month for the purpose of comparison. 12 refs., 4 figs., 48 tabs.

  16. Monthly energy review, November 1993

    1993-11-24

    The Monthly Energy Review gives information on production, distribution, and consumption for various energy sources, e.g. petroleum, natural gas, oil, coal, electricity, and nuclear energy. Some data is also included on international energy sources and supplies, the import of petroleum products into the US and pricing and reserves data (as applicable) for the various sources of energy listed above.

  17. Natural gas monthly, July 1990

    1990-10-03

    This report highlights activities, events, and analyses of interest to public and private sector organizations associated with the natural gas industry. Volume and price data are presented each month for natural gas production, distribution, consumption, and interstate pipeline activities. Producer-related activities and underground storage data are also reported. A glossary is included. 7 figs., 33 tabs.

  18. STD Awareness Month PSA (:30)

    2011-04-19

    April is National STD Awareness Month. STDs can affect anyone. Many STDs don't have symptoms so it's important to get tested.  Created: 4/19/2011 by National Center for HIV/AIDS, Viral Hepatitis, STD, and TB Prevention.   Date Released: 4/19/2011.

  19. Monthly energy review, November 1994

    1994-11-01

    This monthly publication contains statistical data on energy resources in the United States. Petroleum, natural gas, coal, electricity, and nuclear energy are covered. Additional sections include an energy overview, energy consumption, oil and gas resource development and energy prices. This issue includes features on energy-related housing characteristics and the propane-provider fleet

  20. Monthly energy review, January 1996

    NONE

    1996-01-01

    This document presents an overview of the Energy Information Administration`s recent monthly energy statistics. The statistics cover the major activities of U.S. production, consumption, trade, stocks, and prices for petroleum,natural gas, coal, electricity, and nuclear energy. Also included are international energy and thermal metric conversion factors.

  1. Electric power monthly, March 1995

    NONE

    1995-03-20

    This report for March 1995, presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead.

  2. Monthly energy review, June 1993

    1993-06-25

    The Monthly Energy Review provides an overview of the production, distribution, and consumption of energy derived from petroleum, natural gas, coal, electricity, and nuclear energy. It also discusses oil and gas resource development, energy prices, and issues relevant to international energy markets.

  3. Monthly energy review, March 1994

    1994-03-29

    The Monthly Energy Review provides information on production, distribution, consumption, prices, imports, and exports for the following US energy sources: petroleum; petroleum products; natural gas; coal; electricity; and nuclear energy. The section on international energy contains data for world crude oil production and consumption, petroleum stocks in OECD countries, and nuclear electricity gross generation.

  4. Monthly energy review, October 1993

    1993-10-26

    The Monthly Energy Review gives information on production, distribution, and consumption for various energy sources, e.g. petroleum, natural gas, oil, coal, electricity, and nuclear energy. Some data is also included on international energy sources and supplies, the import of petroleum products into the US and pricing and reserves data (as applicable) for the various sources of energy listed above.

  5. Monthly energy review, December 1993

    1993-12-22

    This document provides data on monthly energy use and fossil fuels. The following sections are included: Highlights: Emissions of greenhouse gases in the United States 1985--1990; Highlights: assessment of energy use in multibuilding facilities; energy overview; energy consumption; petroleum; natural gas; oil and gas resource development; coal; electricity; nuclear energy; energy prices; and international energy.

  6. Monthly energy review, April 1994

    1994-04-01

    The Monthly Energy Review contains statistical data on the following: energy consumption, petroleum, natural gas, oil and gas resource development, coal, electricity, nuclear energy, energy prices, and international energy. In addition, an energy overview is provided, and, for the April issue, Energy use and carbon emissions; Some international comparisons.

  7. Monthly energy review, November 1995

    NONE

    1995-11-01

    This document presents an overview of the Energy Information Administration`s recent monthly energy statistics. The statistics cover the major activities of US production, consumption, trade, stocks, and prices for petroleum, natural gas, coal, electricity, and nuclear energy. International energy and thermal and metric conversion factors are included.

  8. Monthly energy review, April 1997

    NONE

    1997-04-01

    This report presents an overview of monthly energy statistics. The statistics cover the major activities of U.S. production, consumption, trade, stocks, and prices for petroleum, natural gas, coal, electricity, and nuclear energy. International energy and thermal metric conversion factors are included.

  9. Periodic progress report, 12 months

    Juhl, Thomas Winther; Nielsen, Jakob Skov

    The work performed during the first 12 months of the project started with the establishment of the cutting theory for the cutting of heavy sections (phase 1). Phase 2 comprises the design of the first laboratory version cutting head with optics, nozzle systems and interfaces for the various...

  10. Monthly energy review, December 1993

    1993-01-01

    This document provides data on monthly energy use and fossil fuels. The following sections are included: Highlights: Emissions of greenhouse gases in the United States 1985--1990; Highlights: assessment of energy use in multibuilding facilities; energy overview; energy consumption; petroleum; natural gas; oil and gas resource development; coal; electricity; nuclear energy; energy prices; and international energy

  11. Monthly energy review, December 1994

    1994-12-01

    This monthly publication contains statistical data on energy resources in the United States. Petroleum, natural gas, coal, electricity, and nuclear energy are covered. Additional sections include an energy overview, energy consumption, oil and gas resource development and energy prices. This issue includes a market assessment of alternative-fuel vehicles in the Atlanta private fleet for 1994

  12. Monthly energy review, April 1994

    1994-04-01

    The Monthly Energy Review contains statistical data on the following: energy consumption, petroleum, natural gas, oil and gas resource development, coal, electricity, nuclear energy, energy prices, and international energy. In addition, an energy overview is provided, and, for the April issue, Energy use and carbon emissions; Some international comparisons

  13. Natural gas monthly, December 1996

    NONE

    1996-12-01

    This document highlights activities, events, and analysis of interest to the public and private sector associated with the natural gas industry. Volume and price data are presented each month for natural gas production, distribution, consumption, and interstate pipeline activities. Producer-related activities and underground storage data are also included.

  14. Prediction of Malaysian monthly GDP

    Hin, Pooi Ah; Ching, Soo Huei; Yeing, Pan Wei

    2015-12-01

    The paper attempts to use a method based on multivariate power-normal distribution to predict the Malaysian Gross Domestic Product next month. Letting r(t) be the vector consisting of the month-t values on m selected macroeconomic variables, and GDP, we model the month-(t+1) GDP to be dependent on the present and l-1 past values r(t), r(t-1),…,r(t-l+1) via a conditional distribution which is derived from a [(m+1)l+1]-dimensional power-normal distribution. The 100(α/2)% and 100(1-α/2)% points of the conditional distribution may be used to form an out-of sample prediction interval. This interval together with the mean of the conditional distribution may be used to predict the month-(t+1) GDP. The mean absolute percentage error (MAPE), estimated coverage probability and average length of the prediction interval are used as the criterions for selecting the suitable lag value l-1 and the subset from a pool of 17 macroeconomic variables. It is found that the relatively better models would be those of which 2 ≤ l ≤ 3, and involving one or two of the macroeconomic variables given by Market Indicative Yield, Oil Prices, Exchange Rate and Import Trade.

  15. Monthly energy review, February 1990

    1990-01-01

    The Monthly Energy Review presents current data on production, consumption, stocks, imports, exports, and prices of the energy commodities in the United States. Also included are data on international production of crude oil, consumption of petroleum products, petroleum stocks, and production of electricity from nuclear-powered facilities

  16. Monthly energy review, July 1991

    1991-01-01

    The Monthly Energy Review presents current data on production, consumption, stocks, imports, exports, and prices of the principal energy commodities in the United States. Also included are data on international production of crude oil, consumption of petroleum products, petroleum stocks, and production of electricity from nuclear-powered facilities

  17. Monthly energy review, April 1991

    1991-01-01

    The Monthly Energy Review presents current data on production, consumption, stocks, imports, exports, and prices of the principal energy commodities in the United States. Also included are data on international production of crude oil, consumption of petroleum products, petroleum stocks, and production of electricity from nuclear-powered facilities

  18. Electric power monthly, July 1994

    1994-07-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. The EPM is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. Statistics by company and plant are published in the EPM on the capability of new generating units, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fossil fuels. Data on quantity, quality, and cost of fossil fuels lag data on net generation, fuel consumption, fuel stocks, electricity sales, and average revenue per kilowatthour by 1 month. This difference in reporting appears in the US, Census division, and State level tables. However, for purposes of comparison, plant-level data are presented for the earlier month.

  19. Petroleum supply monthly, March 1994

    1994-03-30

    Data presented in the Petroleum Supply Monthly (PSM) describe the supply and disposition of petroleum products in the United States and major US geographic regions. The data series describe production, imports and exports, inter-Petroleum Administration for Defense (PAD) District movements, and inventories by the primary suppliers of petroleum products in the United States (50 States and the District of Columbia). The reporting universe includes those petroleum sectors in primary supply. Included are: petroleum refiners, motor gasoline blenders, operators of natural gas processing plants and fractionators, inter-PAD transporters, importers, and major inventory holders of petroleum products and crude oil. When aggregated, the data reported by these sectors approximately represent the consumption of petroleum products in the United States. Data presented in the PSM are divided into two sections: Summary Statistics and Detailed Statistics. The tables and figures in the Summary Statistics section of the PSM present a time series of selected petroleum data on a US level. Most time series include preliminary estimates for one month based on the Weekly Petroleum Supply Reporting System; statistics based on the most recent data from the Monthly Petroleum Supply Reporting System (MPSRS); and statistics published in prior issues of the PSM and PSA. The Detailed Statistics tables of the PSM present statistics for the most current month available as well as year-to-date. In most cases, the statistics are presented for several geographic areas -- the United States (50 States and the District of Columbia), five PAD Districts, and 12 Refining Districts. At the US and PAD District level, the total volume and the daily rate of activities are presented. The statistics are developed from monthly survey forms submitted by respondents to the EIA and from data provided from other sources.

  20. Engineering Task Plan for Hose-In-Hose Transfer Lines for the Interim Stabilization Program

    TORRES, T.D.

    2000-01-01

    The document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of S/SX and U Tank Farms