  1. Effects of Mitigation Measures on Productivity of the White Sturgeon Populations in the Columbia River Downstream from McNary Dam, and Status and Habitat Requirements of White Sturgeon Populations in the Columbia and Snake Rivers Upstream from McNary Dam, 1992-1993 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Beamesdorfer, Raymond C.; Nigro, Anthony A. (Oregon Department of Fish and Wildlife, Portland, OR)

    1993-12-01

    We report on our progress from April 1992-March 1993 in research on white sturgeon in the lower Columbia River. The study began in July 1986 and progress through 1992 was summarized in a comprehensive report in 2 volumes (Beamesderfer and Nigro 1993a, 1993b). This report details activities during the first year of Phase II of this sturgeon research. In Phase I, we assessed the status and habitat requirements of the white sturgeon populations in the Columbia River downstream from McNary Dam. Phase II will examine the effects on white sturgeon productivity of mitigative measures recommended in Phase I. The status and habitat requirements of white sturgeon populations upstream from McNary Dam will also be examined in Phase II. The study is a cooperative effort by the Oregon Department of Fish and Wildlife, Washington Department of Fisheries, U.S. Fish and Wildlife Service, and National Marine Fisheries Service. Work during the past year has focused on: (1) analysis of results of limited sampling conducted in 1992, (2) submission of Phase I results to the peer-review literature to ensure widespread dissemination, clarity of presentation, and credibility of findings, and (3) preparations for additional field work in 1993. In report sections A to D, each agency reports 1992 results if applicable and the current status of manuscripts. Results of field work conducted in 1993 will be reported in the 1994 annual report.

  2. Effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and status and habitat requirements of white sturgeon populations in the Columbia and Snake Rivers upstream from McNary Dam

    International Nuclear Information System (INIS)

    Beamesderfer, R.C.; Nigro, A.A.

    1993-12-01

    This report details activities during the first year of Phase II of this sturgeon research. In Phase I, the authors assessed the status and habitat requirements of the white sturgeon populations in the Columbia River downstream from McNary Dam. Phase II will examine the effects on white sturgeon productivity of mitigative measures recommended in Phase I. The status and habitat requirements of white sturgeon populations upstream from McNary Dam will also be examined in Phase II. The study is a cooperative effort by the Oregon Department of Fish and Wildlife, Washington Department of Fisheries, US Fish and Wildlife Service, and National Marine Fisheries Service. Work during the past year has focused on: (1) analysis of results of limited sampling conducted in 1992, (2) submission of Phase I results to the peer-review literature to ensure widespread dissemination, clarity of presentation, and credibility of findings, and (3) preparation for additional field work in 1993. In report sections A to D, each agency reports 1992 results if applicable and the current status of manuscripts. Results of field work conducted in 1993 will be reported in the 1994 annual report

  3. Assessing survival of Mid-Columbia River released juvenile salmonids at McNary Dam, Washington, 2008-09

    Science.gov (United States)

    Evans, Scott D.; Walker, Christopher E.; Brewer, Scott J.; Adams, Noah S.

    2010-01-01

    Few studies have evaluated survival of juvenile salmon over long river reaches in the Columbia River and information regarding the survival of sockeye salmon at lower Columbia River dams is lacking. To address these information gaps, the U.S. Geological Survey was contracted by the U.S. Army Corps of Engineers to evaluate the possibility of using tagged fish released in the Mid-Columbia River to assess passage and survival at and downstream of McNary Dam. Using the acoustic telemetry systems already in place for a passage and survival study at McNary Dam, fish released from the tailraces of Wells, Rocky Reach, Rock Island, Wanapum, and Priest Rapids Dams were detected at McNary Dam and at the subsequent downstream arrays. These data were used to generate route-specific survival probabilities using single-release models from fish released in the Mid-Columbia River. We document trends in passage and survival probabilities at McNary Dam for yearling Chinook and sockeye salmon and juvenile steelhead released during studies in the Mid-Columbia River. Trends in the survival and passage of these juvenile salmonid species are presented and discussed. However, comparisons made across years and between study groups are not possible because of differences in the source of the test fish, the type of acoustic tags used, the absence of the use of passive integrated transponder tags in some of the release groups, differences in tagging and release protocols, annual differences in dam operations and configurations, differences in how the survival models were constructed (that is, number of routes that could be estimated given the number of fish detected), and the number and length of reaches included in the analysis (downstream reach length and arrays). Despite these differences, the data we present offer a unique opportunity to examine the migration behavior and survival of a group of fish that otherwise would not be studied. This is particularly true for sockeye salmon because

  4. Status and habitat requirements of the white sturgeon populations in the Columbia River downstream from McNary Dam

    International Nuclear Information System (INIS)

    Nigro, A.A.

    1991-09-01

    We report on our progress from April 1990 through March 1991 on determining the status and habitat requirements of white sturgeon populations in the Columbia River downstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW), Washington Department of Fisheries (WDF), US Fish and Wildlife Service (FWS) and National Marine Fisheries Service (NMFS). Study objectives addressed by each agency are to describe the life history and population dynamics of subadults and adults between Bonneville and McNary dams and evaluate the need and identify potential methods for protecting, mitigating and enhancing populations downstream from NcNary Dam; to describe the white sturgeon recreational fishery between Bonneville and McNary dams, describe reproductive and early life history characteristics downstream from Bonneville Dam and describe life history and population dynamics of subadults and adults downstream from Bonneville Dam; to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available between Bonneville and McNary dams; and to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available downstream from Bonneville Dam. Our approach is to work concurrently downstream and upstream from Bonneville Dam. Upstream from Bonneville Dam we began work in the Dalles Reservoir in 1987 and expanded efforts to Bonneville Reservoir in 1988 and John Day Reservoir in 1989. Highlights of results of this work in the Dalles, Bonneville and John Day reservoirs are included in the four pages included in this report

  5. Status and Habitat Requirements of White Sturgeon Populations in the Columbia River Downstream from McNary Dam, 1989-1990 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nigro, Anthony A. (Oregon Department of Fish and Wildlife, Portland, OR)

    1990-09-01

    We report on our progress from April 1989 through March 1990 on determining the status and habitat requirements of white sturgeon populations in the Columbia River downstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW), Washington Department of Fisheries (WDF), US Fish and Wildlife Service (FWS) and National Marine Fisheries Service (NMFS). Study objectives addressed by each agency are to describe the life history and population dynamics of subadults and adults between Bonneville and McNary dams and evaluate the need and identify potential methods for protecting, mitigating and enhancing populations downstream from McNary Dam, to describe the white sturgeon recreational fishery between Bonneville and McNary dams, describe reproductive and early life history characteristics downstream from Bonneville Dam and describe life history and population dynamics of subadults and adults downstream from Bonneville Dam, to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available between Bonneville and McNary dams, and to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available downstream from Bonneville Dam. Our approach is to work concurrently downstream and upstream from Bonneville Dam. Upstream from Bonneville Dam we began work in the Dalles Reservoir in 1987 and expanded efforts to Bonneville Reservoir in 1988 and John Day Reservoir in 1989. Highlights from this work is also included. 47 refs., 33 figs., 66 tabs.

  6. A multi-year analysis of passage and survival at McNary Dam, 2004-09

    Science.gov (United States)

    Adams, Noah S.; Walker, C.E.; Perry, R.W.

    2011-01-01

    We analyzed 6 years (2004–09) of passage and survival data collected at McNary Dam to determine how dam operations and environmental conditions affect passage and survival of juvenile salmonids. A multinomial logistic regression was used to examine how environmental variables and dam operations relate to passage behavior of juvenile salmonids at McNary Dam. We used the Cormack-Jolly-Seber release-recapture model to determine how the survival of juvenile salmonids passing through McNary Dam relates to environmental variables and dam operations. Total project discharge and the proportion of flow passing the spillway typically had a positive effect on survival for all species and routes. As the proportion of water through the spillway increased, the number of fish passing the spillway increased, as did overall survival. Additionally, survival generally was higher at night. There was no meaningful difference in survival for fish that passed through the north or south portions of the spillway or powerhouse. Similarly, there was no difference in survival for fish released in the north, middle, or south portions of the tailrace. For subyearling Chinook salmon migrating during the summer season, increased temperatures had a drastic effect on passage and survival. As temperature increased, survival of subyearling Chinook salmon decreased through all passage routes and the number of fish that passed through the turbines increased. During years when the temporary spillway weirs (TSWs) were installed, passage through the spillway increased for spring migrants. However, due to the changes made in the location of the TSW between years and the potential effect of other confounding environmental conditions, it is not certain if the increase in spillway passage was due solely to the presence of the TSWs. The TSWs appeared to improve forebay survival during years when they were operated.

  7. Columbia River Salmonid Outmigration: McNary Dam Passage and Enhanced Smolt Quality, 1984 Second Year Completion Report.

    Energy Technology Data Exchange (ETDEWEB)

    Schreck, Carl B.

    1984-07-01

    The effects of the McNary Dam transportation system on emigrating fall and spring chinook smolts were evaluated using physiological indices of stress (e.g., plasma cortisol, hepatic glycogen, leucocrit, interrenal cell nuclear diameter) and performance tests (e.g., saltwater challenge, secondary stress challenge, disease resistance). Controlled experiments were conducted in a hatchery environment to characterize the fishes' physiological responses to stress, and disease resistance to allow a basis for judging the nature of the stress experienced by smolts at McNary Dam. 55 figs., 3 tabs.

  8. Survey of Potential Hanford Site Contaminants in the Upper Sediment for the Reservoirs at McNary, John Day, The Dalles, and Bonneville Dams, 2003

    Energy Technology Data Exchange (ETDEWEB)

    Patton, Gregory W.; Priddy, M; Yokel, Jerel W.; Delistraty, Damon A.; Stoops, Thomas M.

    2005-02-01

    This report presents the results from a multi-agency cooperative environmental surveillance study. of the study looked at sediment from the pools upstream from dams on the Columbia River that are downstream from Hanford Site operations. The radiological and chemical conditions existing in the upper-level sediment found in the pools upstream from McNary Dam, John Day Dam, The Dalles Lock and Dam, and Bonneville Dam were evaluated. This study also evaluated beach sediment where available. Water samples were collected at McNary Dam to further evaluate potential Hanford contaminants in the lower Columbia River. Samples were analyzed for radionuclides, chemicals, and physical parameters. Results from this study were compared to background values from sediment and water samples collect from the pool upstream of Priest Rapids Dam (upstream of the Hanford Site) by the Hanford Site Surface Environmental Surveillance Project.

  9. A Markov chain analysis of the movements of juvenile salmonids, including sockeye salmon, in the forebay of McNary Dam, Washington and Oregon, 2006-09

    Science.gov (United States)

    Adams, Noah S.; Hatton, Tyson W.

    2012-01-01

    Passage and survival data were collected at McNary Dam between 2006 and 2009. These data have provided critical information for resource managers to implement structural and operational changes designed to improve the survival of juvenile salmonids as they migrate past the dam. Much of the valuable information collected at McNary Dam was in the form of three-dimensional (hereafter referred to as 3-D) tracks of fish movements in the forebay. These data depicted the behavior of multiple species (in three dimensions) during different diel periods, spill conditions, powerhouse operations, and testing of the surface bypass structures (temporary spillway weirs; TSWs). One of the challenges in reporting 3-D results is presenting the information in a manner that allows interested parties to summarize the behavior of many fish over many different conditions across multiple years. To accomplish this, we used a Markov chain analysis to characterize fish movement patterns in the forebay of McNary Dam. The Markov chain analysis allowed us to numerically summarize the behavior of fish in the forebay. This report is the second report published in 2012 that uses this analytical method. The first report included only fish released as part of the annual studies conducted at McNary Dam. This second report includes sockeye salmon that were released as part of studies conducted by the Chelan and Grant County Public Utility Districts at mid-Columbia River dams. The studies conducted in the mid-Columbia used the same transmitters as were used for McNary Dam studies, but transmitter pulse width was different between studies. Additionally, no passive integrated transponder tags were implanted in sockeye salmon. Differences in transmitter pulse width resulted in lower detection probabilities for sockeye salmon at McNary Dam. The absence of passive integrated transponder tags prevented us from determining if fish passed the powerhouse through the juvenile bypass system (JBS) or turbines. To

  10. Survival and Passage of Yearling and Subyearling Chinook Salmon and Juvenile Steelhead at McNary Dam, 2012

    Energy Technology Data Exchange (ETDEWEB)

    Hughes, James S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Weiland, Mark A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Woodley, Christa M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ploskey, Gene R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Carpenter, Scott M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hennen, Matthew J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fischer, Eric S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Batton, George [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Carlson, Thomas J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Cushing, Aaron W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Deng, Zhiqun [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Etherington, D. J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fu, Tao [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Greiner, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ingraham, John M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kim, Jin A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Li, Xi [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Martinez, Jayson J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mitchell, T. D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rayamajhi, Bishes [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Seaburg, Adam [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Skalski, J. R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Townsend, Richard L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wagner, Katie A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zimmerman, Shon A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-12-23

    The study was designed to evaluate the passage and survival of yearling and subyearling Chinook salmon and juvenile steelhead at McNary Dam as stipulated by the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a virtual/paired-release model. This study supports the USACE’s continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  11. Effects of Mitigative Measures on Productivity of White Sturgeon Populations in the Columbia River Downstream from McNary Dam: Determine Status and Habitat Requirements of White Sturgeon Populations in the Columbia and Snake Rivers Upstream from McNary Dam, 1997-1998 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David L. (Oregon Department of Fish and Wildlife, Portland, OR)

    1999-02-01

    The authors report on their progress from April 1997 through March 1998 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), National Marine Fisheries Service (NMFS; Report D), U.S. Fish and Wildlife Service (USFWS; Report E), and Columbia River Inter-Tribal Fish Commission (CRITFC; Report F). This is a multi-year study with many objectives requiring more than one year to complete. Therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of the work from April 1997 through March 1998 listed.

  12. Evaluation of factors affecting collection efficiency estimates of chinook salmon and steelhead smolts at McNary Dam, 1989. Final report

    International Nuclear Information System (INIS)

    Stuehrenberg, L.; Smith, D.; Johnson, O.W.

    1995-10-01

    Populations of salmonid smolts migrating through the hydropower system on the Columbia River incur some rate of mortality at each dam. To set priorities on options to minimize losses and provide safe passage of the smolts at dams, estimates of smolt survival at each dam are necessary. Two methods have been developed to obtain these survival estimates: the direct and the indirect method. With the indirect method, a test group of fish is released upstream and a-control group is released downstream from the area of interest. With the direct method, a single release of fish above the area of interest is used, with subsequent recovery below the area of interest. In 1988, the National Marine Fisheries Service (NMFS) began a 2-year study at McNary Dam to address possible sources of variation associated with the direct method of obtaining survival estimates. Five study objectives were established to determine whether (1) fish from the Columbia and Snake Rivers mixed as they migrated to McNary Dam (release-location tests); (2) collection rates for Columbia and Snake River stocks were the same (river-of-origin tests); (3) test-group release timing influenced recovery rates (time-of-release tests); (4) a collection-rate bias existed from use of test fish previously guided and collected at the recovery site (tests of previously guided fish); and (5) recovery rates obtained with PIT-tagged fish were comparable to those previously obtained with freeze-branded fish (PIT-tag vs. freeze-brand technology)

  13. 1998-1999 evaluation of fall chinook and chum salmon spawning below Bonneville, The Dalles, John Day and McNary dams

    International Nuclear Information System (INIS)

    Naald, W.D. van der

    2001-01-01

    This report describes work conducted by the Oregon Department of Fish and Wildlife (ODFW) and the Washington Department of Fish and Wildlife (WDFW) from 1 October 1998 to 30 September 1999. The work is part of studies to evaluate spawning of fall chinook salmon (Oncorhynchus tshawytscha) and chum salmon (O. keta) below the four lowermost Columbia River dams under the Bonneville Power Administration's Project 99-003. The purpose of this project is twofold: (1) Document the existence of fall chinook and chum populations spawning below Bonneville Dam (river mile (RM) 145), The Dalles Dam (RM 192), John Day Dam (RM 216), and McNary Dam (RM 292) (Figure 1) and estimate the size of these populations; and (2) Profile stocks for important population characteristics; including spawning time, genetic make-up, emergence timing, migration size and timing, and juvenile to adult survival rates. Specific tasks conducted by ODFW and WDFW during this period were: (1) Documentation of fall chinook and chum spawning below Bonneville, The Dalles, John Day and McNary dams using on-water observations; (2) Collection of biological data to profile stocks in areas described in Task 1; (3) Determination of spawning population estimates and age composition, average size at return, and sex ratios in order to profile stocks in areas described in Task 1; (4) Collection of data to determine stock origin of adult salmon found in areas described in Task 1; (5) Determination of possible stock origins of adult salmon found in areas described in Task 1 using tag rates based on coded-wire tag recoveries and genetic baseline analysis; (6) Determination of emergence timing and hatching rate of juvenile fall chinook and chum below Bonneville Dam; (7) Determination of migration time and size for juvenile fall chinook and chum rearing in the area described in Task 6; (8) Investigation of feasibility of determining stock composition of juvenile fall chinook and chum rearing in the area described in Task 6

  14. Flathead River creel report, 1992--1993. Final report

    International Nuclear Information System (INIS)

    Hanzel, D.

    1995-09-01

    A roving creel survey was conducted on the Flathead River system, May 1992 through May 1993, as part of Hungry Horse Dam Fisheries Mitigation, funded by Bonneville Power Administration. The Flathead River system is a tributary to the Clarks Fork of the Columbia River originating in northwest Montana and southern British Columbia. The river creel survey was conducted in conjunction with a Flathead Lake creel survey. This document summarizes the creel survey on the river system. The purpose of these creel surveys was to quantify fishery status prior to mitigation efforts and provide replicative survey methodology to measure success of future mitigation activities. 4 figs., 21 tabs

  15. Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 1994 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Buettner, Edwin W.; Brimmer, Arnold F.

    1994-10-01

    This project monitored the daily passage of chinook salmon Oncorhynchus tshawytscha and steelhead trout O. mykiss smolts during the 1994 spring outmigration at migrant traps on the Snake River, Clearwater River, and Salmon River. The 1994 snowpack was among the lowest since the beginning of the present drought, and the subsequent runoff was very poor. All hatchery chinook salmon released above Lower Granite Dam were marked with a fin clip in 1994. Total annual (hatchery + wild) chinook salmon catch at the Snake River trap was 1.5 times greater than in 1993. Hatchery and wild steelhead trout catches were similar to 1993. The Snake River trap collected 30 age 0 chinook salmon. Hatchery chinook salmon catch at the Clearwater River trap was 3.5 times higher than in 1993, and wild chinook salmon catch was 4.2 times higher. Hatchery steelhead trout trap catch was less than half of 1993 numbers because the trap was fishing near the north shore during the majority of the hatchery steelhead movement due to flow augmentations from Dworshak. Wild steelhead trout trap catch was 2 times higher than in 1993. The Salmon River trap was operated for about a month longer in 1994 than in 1993 due to extremely low flows. Hatchery chinook salmon catch was 1.4 times greater in 1994 than the previous year. Wild chinook salmon catch was slightly less in 1994. The 1994 hatchery steelhead trout collection did not change significantly from 1993 numbers. Wild steelhead trout collection in 1994 was 59% of the 1993 catch. Fish tagged with Passive Integrated Transponder (PIT) tags at the Snake River trap were interrogated at four dams with PIT tag detection systems (Lower Granite, Little Goose, Lower Monumental, and McNary dams). Because of the addition of the fourth interrogation site (Lower Monumental) in 1993, cumulative interrogation data is not comparable with the prior five years (1988-1992).

  16. Progress at LAMPF, 1992--1993

    Energy Technology Data Exchange (ETDEWEB)

    Hoffman, C.M. [ed.

    1994-07-25

    This Progress Report describes the operation of the Los Alamos Meson Physics Facility (LAMPF) and the research programs carried out there for the years 1992 and 1993. The accelerator operated for over 100 days in 1992, providing beams of H{sup +}, H{sup {minus}}, and polarized H{sup {minus}} for a rich and varied research program in nuclear physics. The accelerator had only fair beam availability in 1992 (for example, the average H{sup +} beam availability was 72%), caused largely by problems in the 201-MHz rf system. A major effort was expended to address these problems before the 1993 run. These efforts were rewarded by good beam availability in 1993 and few problems with the 201-MHz system. LAMPF operated remarkably smoothly during 1993, in the midst of a period of great uncertainty in the future of the facility and the downsizing of MP Division, which led to the loss of a large number of key people to positions elsewhere in the Laboratory. The H{sup +} intensity had to be held to no more than {approximately} 800{mu}A because of a vacuum leak in the A2 target. Nevertheless, the accelerator operated very.reliably and the summer run in 1993 proved to be extremely productive. This report discusses the research conducted on: Nuclear and particle physics; atomic physics; radiation effects; materials science; astrophysics; and theoretical physics.

  17. Progress at LAMPF, 1992--1993

    International Nuclear Information System (INIS)

    Hoffman, C.M.

    1994-01-01

    This Progress Report describes the operation of the Los Alamos Meson Physics Facility (LAMPF) and the research programs carried out there for the years 1992 and 1993. The accelerator operated for over 100 days in 1992, providing beams of H + , H - , and polarized H - for a rich and varied research program in nuclear physics. The accelerator had only fair beam availability in 1992 (for example, the average H + beam availability was 72%), caused largely by problems in the 201-MHz rf system. A major effort was expended to address these problems before the 1993 run. These efforts were rewarded by good beam availability in 1993 and few problems with the 201-MHz system. LAMPF operated remarkably smoothly during 1993, in the midst of a period of great uncertainty in the future of the facility and the downsizing of MP Division, which led to the loss of a large number of key people to positions elsewhere in the Laboratory. The H + intensity had to be held to no more than ∼ 800μA because of a vacuum leak in the A2 target. Nevertheless, the accelerator operated very.reliably and the summer run in 1993 proved to be extremely productive. This report discusses the research conducted on: Nuclear and particle physics; atomic physics; radiation effects; materials science; astrophysics; and theoretical physics

  18. AGS experiments -- 1991, 1992, 1993

    International Nuclear Information System (INIS)

    Depken, J.C.

    1994-04-01

    This report contains: (1) FY 1993 AGS schedule as run; (2) FY 1994--95 AGS schedule; (3) AGS experiments ≥ FY 1993 (as of 30 March 1994); (4) AGS beams 1993; (5) AGS experimental area FY 1991 physics program; (6) AGS experimental area FY 1992 physics program; (7) AGS experimental area FY 1993 physics program; (8) AGS experimental area FY 1994 physics program (planned); (9) a listing of experiments by number; (10) two-page summaries of each experiment; (11) listing of publications of AGS experiments; and (12) listing of AGS experiments

  19. A multi-year analysis of spillway survival for juvenile salmonids as a function of spill bay operations at McNary Dam, Washington and Oregon, 2004-09

    Science.gov (United States)

    Adams, Noah S.; Hansel, Hal C.; Perry, Russell W.; Evans, Scott D.

    2012-01-01

    We analyzed 6 years (2004-09) of passage and survival data collected at McNary Dam to examine how spill bay operations affect survival of juvenile salmonids passing through the spillway at McNary Dam. We also examined the relations between spill bay operations and survival through the juvenile fish bypass in an attempt to determine if survival through the bypass is influenced by spill bay operations. We used a Cormack-Jolly-Seber release-recapture model (CJS model) to determine how the survival of juvenile salmonids passing through McNary Dam relates to spill bay operations. Results of these analyses, while not designed to yield predictive models, can be used to help develop dam-operation strategies that optimize juvenile salmonid survival. For example, increasing total discharge typically had a positive effect on both spillway and bypass survival for all species except sockeye salmon (Oncorhynchus nerka). Likewise, an increase in spill bay discharge improved spillway survival for yearling Chinook salmon (Oncorhynchus tshawytscha), and an increase in spillway discharge positively affected spillway survival for juvenile steelhead (Oncorhynchus mykiss). The strong linear relation between increased spill and increased survival indicates that increasing the amount of water through the spillway is one strategy that could be used to improve spillway survival for yearling Chinook salmon and juvenile steelhead. However, increased spill did not improve spillway survival for subyearling Chinook salmon and sockeye salmon. Our results indicate that a uniform spill pattern would provide the highest spillway survival and bypass survival for subyearling Chinook salmon. Conversely, a predominantly south spill pattern provided the highest spillway survival for yearling Chinook salmon and juvenile steelhead. Although spill pattern was not a factor for spillway survival of sockeye salmon, spill bay operations that optimize passage through the north and south spill bays maximized

  20. Identification of the Spawning, Rearing, and Migratory Requirements of Fall Chinook Salmon in the Columbia River Basin, Annual Report 1993.

    Energy Technology Data Exchange (ETDEWEB)

    Rondorf, Dennis W.; Tiffan, Kenneth F.

    1994-12-01

    Recovery efforts for the endangered fall chinook salmon necessitates knowledge of the factors limiting the various life history stages. This study attempts to identify those physical and biological factors which affect spawning of the fish in the free-flowing Snake River and their rearing seward migration through Columbia River basin reservoirs. The spawning was generally a November event in 1993, with some activity in late Oct. and early Dec. Spawning habitat availability was assessed by applying hydraulic and habitat models to known fall chinook salmon spawning sites. Juveniles were seined and PIT tagged in the free-flowing Snake River, and in the Columbia River in he Hanford Reach and in McNary Reservoir. Subyearling fish were marked at McNary Dam to relate river flow and migration patterns of juveniles to adult returns. Hydroacoustic surveys were conducted on McNary and John Day reservoirs and in net pens.

  1. Status and Habitat Requirements of the White Sturgeon Populations in the Columbia River Downstream from McNary Dam Volume II; Supplemental Papers and Data Documentation, 1986-1992 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Beamesderfer, Raymond C.; Nigro, Anthony A. [Oregon Dept. of Fish and Wildlife, Clackamas, OR (US)

    1995-01-01

    This is the final report for research on white sturgeon Acipenser transmontanus from 1986--92 and conducted by the National Marine Fisheries Service (NMFS), Oregon Department of Fish and Wildlife (ODFW), US Fish and Wildlife Service (USFWS), and Washington Department of Fisheries (WDF). Findings are presented as a series of papers, each detailing objectives, methods, results, and conclusions for a portion of this research. This volume includes supplemental papers which provide background information needed to support results of the primary investigations addressed in Volume 1. This study addresses measure 903(e)(1) of the Northwest Power Planning Council's 1987 Fish and Wildlife Program that calls for ''research to determine the impact of development and operation of the hydropower system on sturgeon in the Columbia River Basin.'' Study objectives correspond to those of the ''White Sturgeon Research Program Implementation Plan'' developed by BPA and approved by the Northwest Power Planning Council in 1985. Work was conducted on the Columbia River from McNary Dam to the estuary.

  2. Nuclear Data in Argentina (1992 -1993)

    International Nuclear Information System (INIS)

    Ricabarra, G. H.

    1993-03-01

    A progress report of nuclear data research in Argentina is given for the years 1992/1993, including the WIMS nuclear data library update project, and measurements and evaluations of selected neutron induced nuclear reactions. (author)

  3. System-Wide Significance of Predation on Juvenile Salmonids in Columbia and Snake River Reservoirs : Annual Report 1992.

    Energy Technology Data Exchange (ETDEWEB)

    Petersen, James H.; Poe, Thomas P.

    1993-12-01

    Northern squawfish (Ptychocheilus oregonensis) predation on juvenile salmonids was characterized during 1992 at ten locations in the Columbia River below Bonneville Dam and at three locations in John Day Reservoir. During the spring and summer, 1,487 northern squawfish were collected in the lower Columbia River and 202 squawfish were sampled in John Day Reservoir. Gut content data, predator weight, and water temperature were used to compute a consumption index (CI) for northern squawfish, and overall diet was also described. In the Columbia River below Bonneville Dam, northern squawfish diet was primarily fish (spring 69%; summer 53%), most of which were salmonids. Salmonids were also the primary diet component in the Bonneville Dam tailrace, John Day Dam forebay, and the McNary Dam tailrace. Crustaceans were the dominant diet item at the John Day mid-reservoir location, although sample sizes were small. About half of the non-salmonid preyfish were sculpins. The consumption index (CI) of northern squawfish was generally higher during summer than during spring. The highest CI`s were observed during summer in the tailrace boat restricted zones of Bonneville Dam (CI = 7.8) and McNary Dam (CI = 4.6). At locations below Bonneville Dam, CI`s were relatively low near Covert`s Landing and Rooster Rock, higher at four locations between Blue Lake and St. Helens, and low again at three downriver sites (Kalama, Ranier, and Jones Beach). Northern squawfish catches and CI`s were noticeably higher throughout the lower Columbia compared to mid-reservoir sites further upriver sampled during 1990--92. Predation may be especially intense in the free-flowing section of the Columbia River below Bonneville Dam. Smallmouth bass (Micropterus dolomieui; N = 198) ate mostly fish -- 25% salmonids, 29% sculpins, and 46% other fish. Highest catches of smallmouth bass were in the John Day Dam forebay.

  4. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David L.; Kern, J. Chris; Hughes, Michele L. (Oregon Department of Fish and Wildlife)

    2004-02-01

    We report on our progress from April 2002 through March 2003 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam.

  5. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David L.; Kern, J. Chris; Hughes, Michele L.

    2003-12-01

    We report on our progress from April 2001 through March 2002 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam.

  6. State energy price projections for the residential sector, 1992--1993

    International Nuclear Information System (INIS)

    1992-01-01

    The purpose of this report, State Energy Price Projections for the Residential Sector, 1992--1993, is to provide projections of State-level residential prices for 1992 and 1993 for the following fuels: electricity, natural gas, heating oil, liquefied petroleum gas (LPG), kerosene, and coal. Prices for 1991 are also included for comparison purposes. This report also explains the methodology used to produce these estimates and the limitations

  7. Annual Report 1992-1993

    International Nuclear Information System (INIS)

    1993-11-01

    The Office of The Supervising Scientist (OSS) underwent several significant changes during 1992-1993. Thus, the Sydney office was relocated to Canberra, and by May 1993 all OSS operations outside of the Northern Territory were being carried out at that locality. The relocation provided an opportunity to review the staff structure and increase efficiency. The annual report describes in detail work being undertaken, both nationally and internationally in developing radiation protection concepts that are appropriate for uranium mining industry. The emphasis of OSS research program is oriented towards effects on the environment. The report also provides a summary of of the progress of all active projects of the Alligator Rivers Region Institute. Details of all published and unpublished papers as well as the financial statement for the OSS are included in Appendixes. 16 tabs.; 28 figs

  8. Status and Habitat Requirements of White Sturgeon Populations in the Columbia River Downstream from McNary Dam, 1988-1989 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nigro, Anthony A. (Oregon Dept. of Fish and Wildlife, Portland, OR (USA))

    1989-09-01

    We report on our progress from April 1988 through March 1989 on determining the status and habitat requirements of white sturgeon populations in the Columbia River downstream from McNary Dam. Highlights of results of our work in the Dalles and Bonneville reservoirs are: using setlines, we caught 1,586 sturgeon in The Dalles Reservoir and 484 sturgeon in Bonneville Reservoir in 1988. Fork length of fish caught ranged from 34 cm to 274 cm. Of the fish caught we marked 1,248 in The Dalles Reservoir and 341 in Bonneville Reservoir. Of the fish marked in 1988, we recaptured 82 in The Dalles Reservoir and none in Bonneville Reservoir. We recaptured 89 fish marked in 1987 in The Dalles Reservoir. Anglers recaptured 35 fish marked in 1988 and 16 fish marked in 1987 in The Dalles Reservoir. Anglers recaptured 2 sturgeon marked in 1988 in Bonneville Reservoir. Individual papers were processed separately for the data base.

  9. Radioactivity measurement in Austria 1992 and 1993. Data and evaluation; Radioaktivitaetsmessungen in Oesterreich 1992 und 1993. Daten und Bewertung

    Energy Technology Data Exchange (ETDEWEB)

    Bobek, E

    1996-12-31

    The Federal Ministry of Health and Consumer Protection is responsible for the large scale surveillance of radioactive contaminations of the Austrian territory. For this purpose on one hand an on-line measurement system has been set up, using gamma dose rate measuring devices situated in 336 locations. On the other hand, various media e.g. aerosols, precipitation, surface water and foodstuffs are being collected. Their radionuclide content is analysed in several laboratories. Additional special projects have been set up to improve the knowledge of the time dependence respectively of regional aspects of the contamination situation. The report covers the results of this surveillance for the years 1992 and 1993. The evaluation of these measurements and of other data concerning the average exposure of the Austrian population for the year 1993 is summarized in the following figure. It can be seen that the main contributions to the radiation dose are due to natural exposure pathways, among which the inhalation of indoor radon is of main importance. (Compared to the data in earlier reports due to a new evaluation of the radon risk by ICRP this dose contribution is significantly lower.) In comparison, the component due to the consequences of the Chernobyl reactor accident in 1986 onto Austrian territory during 1992 and 1993 was marginal. (author)

  10. State heating oil and propane program. Final report, 1992--1993

    International Nuclear Information System (INIS)

    Rizzolo, D.R.

    1997-01-01

    In cooperation with the United States Department of Energy (USDOE), Energy Information Administration (EIA) the New Jersey Department of Environmental Protection and Energy (DEPE), Office of Energy participated in an ongoing program to monitor retail prices of no. 2 heating oil and propane in New Jersey. According to program instructions, we conducted price surveys on a semi-monthly basis to obtain the necessary information from retail fuel merchants and propane dealers identified by the EIA. According to program instructions and at the discretion of the USDOE, we conducted four additional propane surveys on January 11 and 25, and April 5 and 19, 1993. The heating oil surveys began on October 5, 1992 and ended on March 15, 1993. The propane surveys began on October 5, 1992 and ended on April 19, 1993. We submitted data collected as of specified report dates to the EIA, within two working days of those dates

  11. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rien, Thomas A.; Hughes, Michele L.; Kern, J. Chris (Oregon Department of Fish and Wildlife, Clackamas, OR)

    2006-03-01

    We report on our progress from April 2004 through March 2005 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.

  12. White Sturgeon Mitgation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rein, Thomas A.; Hughes, Michele L.; Kern, J. Chris (Oregon Department of Fish and Wildlife, Clackamas, OR)

    2005-08-01

    We report on our progress from April 2003 through March 2004 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.

  13. Directors' report and accounts 1992/1993

    International Nuclear Information System (INIS)

    1993-01-01

    This item is the Directors' Report and Accounts for the financial year 1992/1993 for Scottish Hydro-Electric plc, a United Kingdom utility which generates, distributes and sells electricity to its customers in that country. While generation is based in Scotland, the company is seeking to penetrate the energy market in England and Wales, and increase earnings in Scotland through improved performance. Increased customer and shareholder satisfaction is identified as a continuing goal. Turnover, profits and dividends to shareholders have all increased during the year. (UK)

  14. Radioactivity measurements in Austria from 1992 to 1993 - data and assesment; Radioaktivitaetsmessungen in Oesterreich 1992 und 1993 - Daten und Bewertung

    Energy Technology Data Exchange (ETDEWEB)

    Bobek, E

    1995-05-01

    The Federal Ministry of Health and Consumer Protection is responsible for the large scale surveillance of radioactive contaminations of the Austrian territory. For this purpose on one hand an on-line measurement system has been set up, using gamma dose rate measuring devices situated in 336 locations. On the other hand, various media e.g. aerosols, precipitation, surface water and foodstuffs are being collected. Their radionuclide content is analyzed in several laboratories. Additional special projects have been set up to improve the knowledge of the time dependence respectively of regional aspects of the contamination situation. The report covers the results of this surveillance for the years 1992 and 1993. It can be seen that the main contributions to the radiation dose are due to natural exposure pathways, among which the inhalation of indoor radon is of main importance. (Compared to the data in earlier reports due to a new evaluation of the radon risk by ICRP this dose contribution is significantly lower.) In comparison, the component due to the consequences of the Chernobyl reactor accident in 1986 onto Austrian territory during 1992 and 1993 was marginal. (author)

  15. JAERI TANDEM and V.D.G. annual report 1992 April 1, 1992 - March 31, 1993

    International Nuclear Information System (INIS)

    1993-09-01

    This annual report describes research activities which have been performed with the JAERI tandem accelerator and the Van de Graaff accelerator from April 1, 1992 to March 31, 1993. Summary reports of 41 papers, and list of publications, personnel and cooperative researches with universities are contained. (author)

  16. Luchtverontreiniging door vuurwerk tijdens de jaarwisseling van 1992-1993

    NARCIS (Netherlands)

    Noordijk H

    1993-01-01

    A sharp increase of atmospheric pollutants was observed during the festivities at the turn of the year 1992. Concentrations of fine particles (PM10) over the first day of the new year were more than 200 mug/m3. During the first hour of 1993, concentrations of 1,000 - 10,000 mug/m3 are estimated

  17. Exchange Rate Determinants in Russia; 1992-1993

    OpenAIRE

    Vincent Koen; Eric Meyermans

    1994-01-01

    This paper examines the evolution of the exchange rate of the ruble vis-à-vis the U.S. dollar from exchange rate unification, in July 1992, to the end of 1993. The expected and actual paths of the exchange rate are related to the exchange and trade regime and to the stance of financial and exchange rate policies. An econometric analysis based on weekly data is offered, which suggests that monetary factors have a significant impact on the short run behavior of the exchange rate.

  18. Radioactivity measurement in Austria 1992 and 1993. Data and evaluation

    International Nuclear Information System (INIS)

    Bobek, E.

    1995-01-01

    The Federal Ministry of Health and Consumer Protection is responsible for the large scale surveillance of radioactive contaminations of the Austrian territory. For this purpose on one hand an on-line measurement system has been set up, using gamma dose rate measuring devices situated in 336 locations. On the other hand, various media e.g. aerosols, precipitation, surface water and foodstuffs are being collected. Their radionuclide content is analysed in several laboratories. Additional special projects have been set up to improve the knowledge of the time dependence respectively of regional aspects of the contamination situation. The report covers the results of this surveillance for the years 1992 and 1993. The evaluation of these measurements and of other data concerning the average exposure of the Austrian population for the year 1993 is summarized in the following figure. It can be seen that the main contributions to the radiation dose are due to natural exposure pathways, among which the inhalation of indoor radon is of main importance. (Compared to the data in earlier reports due to a new evaluation of the radon risk by ICRP this dose contribution is significantly lower.) In comparison, the component due to the consequences of the Chernobyl reactor accident in 1986 onto Austrian territory during 1992 and 1993 was marginal. (author)

  19. Emissies in Nederland - 1992 Trends, Thema's en Doelgroepen. Ramingen 1993

    NARCIS (Netherlands)

    Berdowski JJM; Auweraert RJK van der; Most PFJ van der; Thomas R; Zonneveld EA; Ministerie van; Centraal Bureau voor de Statistiek CBS; Rijksinstituut voor Volksgezondheid en; LAE; TNO; CBS

    1994-01-01

    In this report a survey is presented of the emission of approximately 60 compounds to the air and the surface-water in the Netherlands for the year 1992. For the year 1993 the emissions are estimated. For each compound specific information is given on the sources of emissions, on the relative

  20. Ship-Source Oil Pollution Fund annual report, 1992-1993

    International Nuclear Information System (INIS)

    1993-01-01

    The activities of the Ship-Source Oil Pollution Fund (SOPC) are reviewed for the fiscal year commencing 1 April 1992 and ending 31 March 1993. Topics covered include the Canadian compensation regime, activities of the International Oil Pollution Compensation Fund (to which the SOPC contributes), amendments to the Canada Shipping Act, major international incidents, the International Conference on the Revision of the 1969 Civil Liability Convention and the 1971 Fund Convention, the 1993 Oil Spill Conference, and the status of the fund. Twenty-nine oil spill incidents are described along with actions taken, if any, by the SOPC and details of any claims paid by the SOPC or the international fund. 3 figs

  1. Inhalation Toxicology Research Institute. Annual report, October 1, 1992--September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Nikula, K.J.; Belinsky, S.A.; Bradley, P.L. [eds.

    1993-11-01

    This annual report for the Inhalation Toxicology Research Institute for 1992-1993 consists of 60 individual reports prepared separately by investigators describing progress in their own projects. Most papers are 2-5 pages long.

  2. Status and habitat requirements of the white sturgeon populations in the Columbia River downstream from McNary Dam. Volume 2: Supplemental papers and data documentation; Final report

    International Nuclear Information System (INIS)

    Beamesderfer, R.C.; Nigro, A.A.

    1995-01-01

    This is the final report for research on white sturgeon Acipenser transmontanus from 1986--92 and conducted by the National Marine Fisheries Service (NMFS), Oregon Department of Fish and Wildlife (ODFW), US Fish and Wildlife Service (USFWS), and Washington Department of Fisheries (WDF). Findings are presented as a series of papers, each detailing objectives, methods, results, and conclusions for a portion of this research. This volume includes supplemental papers which provide background information needed to support results of the primary investigations addressed in Volume 1. This study addresses measure 903(e)(1) of the Northwest Power Planning Council's 1987 Fish and Wildlife Program that calls for ''research to determine the impact of development and operation of the hydropower system on sturgeon in the Columbia River Basin.'' Study objectives correspond to those of the ''White Sturgeon Research Program Implementation Plan'' developed by BPA and approved by the Northwest Power Planning Council in 1985. Work was conducted on the Columbia River from McNary Dam to the estuary

  3. Legislative developments in radioactive materials transportation, November 1992--March 1993

    International Nuclear Information System (INIS)

    Reed, J.B.; Cummins, J.

    1993-04-01

    This is the sixth report prepared by the National Conference of State Legislatures (NCSL) on developments in radioactive materials transportation. It updates information contained in the November 1992 Legislative and Legal Developments in Radioactive Materials Transportation report and describes activities for the period November 1, 1992--March 31, 1993. NCSL is working to bring on-line a data base that contains abstracts of state laws and regulations relating to the transportation of radioactive materials. The data base will be operated by NCSL under a cooperative agreement with the Department of Energy's (DOE) Office of Civilian Radioactive Waste Management. Limited availability of on-line capability is anticipated by the end of July 1993. Users approved by DOE and NCSL will have access to the data base. Hard copy of any legislation listed in this report can be obtained by contacting the people listed below. This report contains summaries of legislation introduced in the 1993 state legislative sessions. Bills that address nuclear materials transportation and the broader area of hazardous materials transportation are grouped by state according to their status--enacted, pending or failed. In addition, bills that deal with emergency preparedness and general nuclear waste issues are described. Also included are Federal Register notices pertinent to radioactive waste and hazardous materials transportation. A recent court decision is also summarized

  4. Analyses of potential factors affecting survival of juvenile salmonids volitionally passing through turbines at McNary and John Day Dams, Columbia River

    Science.gov (United States)

    Beeman, John; Hansel, Hal; Perry, Russell; Hockersmith, Eric; Sandford, Ben

    2011-01-01

    This report describes analyses of data from radio- or acoustic-tagged juvenile salmonids passing through hydro-dam turbines to determine factors affecting fish survival. The data were collected during a series of studies designed to estimate passage and survival probabilities at McNary (2002-09) and John Day (2002-03) Dams on the Columbia River during controlled experiments of structures or operations at spillways. Relatively few tagged fish passed turbines in any single study, but sample sizes generally were adequate for our analyses when data were combined from studies using common methods over a series of years. We used information-theoretic methods to evaluate biological, operational, and group covariates by creating models fitting linear (all covariates) or curvilinear (operational covariates only) functions to the data. Biological covariates included tag burden, weight, and water temperature; operational covariates included spill percentage, total discharge, hydraulic head, and turbine unit discharge; and group covariates included year, treatment, and photoperiod. Several interactions between the variables also were considered. Support of covariates by the data was assessed by comparing the Akaike Information Criterion of competing models. The analyses were conducted because there was a lack of information about factors affecting survival of fish passing turbines volitionally and the data were available from past studies. The depth of acclimation, tag size relative to fish size (tag burden), turbine unit discharge, and area of entry into the turbine intake have been shown to affect turbine passage survival of juvenile salmonids in other studies. This study indicates that turbine passage survival of the study fish was primarily affected by biological covariates rather than operational covariates. A negative effect of tag burden was strongly supported in data from yearling Chinook salmon at John Day and McNary dams, but not for subyearling Chinook salmon or

  5. Bi-annual report 1992-1993. Operational and research activities of Central Laboratory for Radiological Protection

    International Nuclear Information System (INIS)

    1994-06-01

    Bi-annual report of Central Laboratory for Radiological Protection, Warsaw shows its activities in 1992-1993. The general information and organization of CLOR have been shown in the first part of the report. The second part contains extended abstracts of scientific activity, especially in: environmental radioactivity monitoring, supervision and control of the users of radioactive sources, personal dosimetry, calibration and periodical control of dosimetric equipment, radiobiology and radiological hazard assessment. The report also includes the full list of publications of scientists of CLOR issued in the period of 1992-1993

  6. Bi-annual report 1992-1993. Operational and research activities of Central Laboratory for Radiological Protection

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-06-01

    Bi-annual report of Central Laboratory for Radiological Protection, Warsaw shows its activities in 1992-1993. The general information and organization of CLOR have been shown in the first part of the report. The second part contains extended abstracts of scientific activity, especially in: environmental radioactivity monitoring, supervision and control of the users of radioactive sources, personal dosimetry, calibration and periodical control of dosimetric equipment, radiobiology and radiological hazard assessment. The report also includes the full list of publications of scientists of CLOR issued in the period of 1992-1993.

  7. US Department of Energy 1992--1993 Reactor Sharing Program

    International Nuclear Information System (INIS)

    Vernetson, W.G.

    1994-04-01

    The University of Florida Training Reactor serves as a host institution to support various educational institutions which are located primarily within the state of Florida. All users and uses were carefully screened to assure the usage was for educational institutions eligible for participation in the Reactor Sharing Program. Three tables are included that provide basic information about the 1992--1993 program and utilization of the reactor facilities by user institutions

  8. Renewable energy sources and their contribution to gross domestic energy consumption in Italy in years 1992 and 1993; Censimento per il territorio italiano dei dati relativi alle fonti rinnovabili di energia ed al loro contributo al bilancio energetico per gli anni 1992 e 1993

    Energy Technology Data Exchange (ETDEWEB)

    Menna, P [ENEA, Centro Ricerche, Portici (Italy). Dip. Energia

    1995-11-01

    In 1992, the gross domestic energy consumption in Italy was 167.5 MTOE (including bunkers) while in 1993 it decreased to 165.9 MTOE. The overall electricity demand passed from 244.8 TWh in 1992 to 246.6 TWh in 1993. In the same period, the overall contribution from Renewable Energy Sources (RES) kept almost constant at 5.y consumption. The RES contribution represented a share larger than gross National production of energy in 1992.

  9. Upstream passage, spawning, and stock identification of fall chinook in the Snake River, 1992 and 1993. Final report

    International Nuclear Information System (INIS)

    Blankenship, H.L.; Mendel, G.W.

    1997-05-01

    This final report of the 3-year study summarizes activities and results for 1993. Study objectives were to: (1) determine the source of losses (or accounting errors) for adult chinook salmon between Ice Harbor Dam (IHR) and Lower Granite Dam (LGR), and upstream of LGR in the Snake River; (2) identify spawning locations upstream of LGR for calibration of aerial redd surveys, redd habitat mapping, carcass recovery for genetic stock profile analysis, and correction of estimated adult/redd ratios; and (3) estimate passage and migration times at Snake River. 200 fall chinook salmon were radio tagged and tracked with aerial, fixed-site, and ground mobile tracking. Fish were released upstream of IHR at Charbonneau Park (CHAR). 190 of the fish were tracked or relocated away from CHAR. 59 fish descended to below IHR without crossing Lower Monumental Dam (LMO). Another 128 salmon passed upstream of LMO without falling back at IHR. Only 80 salmon passed Little Goose Dam (LGO) without falling back at a downstream dam; 66 of these fish passed LGR. Many fish that fell back reascended the dams. A total of 72 salmon released at CHAR passed upstream of LGR, including fish that had fallen back and reascended a dam. Over 80 percent of the salmon that entered Lyons Ferry Hatchery each year had reached LGO before descending to the hatchery. Extensive wandering was documented between LMO and upstream of LGR before salmon entered Lyons Ferry Hatchery or the Tucannon River. In 1993, 41 salmon were found to be of hatchery origin when recovered. These fish entered Lyons Ferry Hatchery with similar movements to unmarked salmon. Each year a few salmon have remained near the hatchery without entering, which suggests the hatchery may have inadequate attraction flows. Fall chinook passed lower Snake River dams in 2-5 days each on average. Median travel times through LMO and LGO were 1.0-1.3 days each, which was slower than for spring chinook or steelhead in 1993. 5 refs., 21 figs., 20 tabs

  10. Spectroscopy Division progress report (July 1992-June 1993)

    International Nuclear Information System (INIS)

    Singh, Mahavir

    1994-01-01

    The research and development activities of the Spectroscopy Division during the year July 1992-June 1993 are reported in the form of individual summaries. These are arranged under the headings: (1) analytical spectroscopy, (2) infrared and Raman spectroscopy, (3) atomic spectra, (4) electronic spectra, (5) laser spectroscopy, (6) synchrotron beam foil and plasma spectroscopy, (7) optics, (8) electronics and instrumentation, and (9) design, fabrication and workshop etc. The list of publications and papers presented at the various conferences, symposia, workshops etc. by the staff members of the Division during the report period is also given. (author)

  11. Continual improvement: A bibliography with indexes, 1992-1993

    Science.gov (United States)

    1994-01-01

    This bibliography lists 606 references to reports and journal articles entered into the NASA Scientific and Technical Information Database during 1992 to 1993. Topics cover the philosophy and history of Continual Improvement (CI), basic approaches and strategies for implementation, and lessons learned from public and private sector models. Entries are arranged according to the following categories: Leadership for Quality, Information and Analysis, Strategic Planning for CI, Human Resources Utilization, Management of Process Quality, Supplier Quality, Assessing Results, Customer Focus and Satisfaction, TQM Tools and Philosophies, and Applications. Indexes include subject, personal author, corporate source, contract number, report number, and accession number.

  12. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; Annual Progress Report, April 2007 - March 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Mallette, Christine [Oregon Department of Fish and Wildlife

    2009-07-28

    We report on our progress from April 2007 through March 2008 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), Columbia River Inter-Tribal Fish Commission (CRITFC; Report C), and Montana State University (MSU; Report D). This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.

  13. Radioactivity measurements in Austria from 1992 to 1993 - data and assesment

    International Nuclear Information System (INIS)

    Bobek, E.

    1995-05-01

    The Federal Ministry of Health and Consumer Protection is responsible for the large scale surveillance of radioactive contaminations of the Austrian territory. For this purpose on one hand an on-line measurement system has been set up, using gamma dose rate measuring devices situated in 336 locations. On the other hand, various media e.g. aerosols, precipitation, surface water and foodstuffs are being collected. Their radionuclide content is analyzed in several laboratories. Additional special projects have been set up to improve the knowledge of the time dependence respectively of regional aspects of the contamination situation. The report covers the results of this surveillance for the years 1992 and 1993. It can be seen that the main contributions to the radiation dose are due to natural exposure pathways, among which the inhalation of indoor radon is of main importance. (Compared to the data in earlier reports due to a new evaluation of the radon risk by ICRP this dose contribution is significantly lower.) In comparison, the component due to the consequences of the Chernobyl reactor accident in 1986 onto Austrian territory during 1992 and 1993 was marginal. (author)

  14. Summary Report on the Audit of Defense Base Closure and Realignment Budget Data for Fiscal Year 1992 and 1993

    Science.gov (United States)

    1993-05-25

    OFFICE OF THE INSPECTOR GENERAL SUMMARY REPORT ON THE AUDIT OF DEFENSE BASE CLOSURE AND REALIGNMENT BUDGET DATA FOR FISCAL YEARS 1992 AND 1993...ASSISTANT SECRETARY OF DEFENSE (INSTALLATIONS) SUBJECT: Summary Report on the Audit of Defense Base Closure and Realignment Budget Data for Fiscal Years...1992 and 1993 (Report No. 93-100) We are providing this final summary report for your information and use. The audit was required by Public Law

  15. Environmental radioactivity in Denmark in 1992 and 1993

    International Nuclear Information System (INIS)

    Aarkrog, A.; Boetter-Jensen, L.; Chen Qing Jiang; clausen, J.; Dahlgaard, H.; Hansen, H.; Lauridsen, B.; Nielsen, S.P.; Strandberg, M.; Soegaard-Hansen, J.; Holm, E.

    1995-02-01

    Strontium-90, radiocesium, and other radionuclides were determined in samples from all over the country of air, precipitation, stream water, lake water, sea water, soil, sediments, dried milk, fresh milk, met, fish cheese, eggs, grain, bread, potatoes, vegetables, fruit, grass, lichen, sea plants, total diet, and humans. Estimates are given of the mean contents of radiostrontium and radiocesium in the human diet in Denmark during 1992 and 1993. Tritium was determined in precipitation, fresh water, and seawater. The γ-background was measured regularly by TLD's and a NaI detector. Tc-99 determinations were carried out on various marine samples, first of all seawater. (au) (102 tabs., 63 ills., 14 refs.)

  16. FAA/NASA Joint University Program for Air Transportation Research, 1992-1993

    Science.gov (United States)

    Morrell, Frederick R. (Compiler)

    1994-01-01

    The research conducted during the academic year 1992-1993 under the FAA/NASA sponsored Joint University Program for Air Transportation Research is summarized. The year end review was held at Ohio University, Athens, Ohio, 17-18 June 1993. The Joint University Program is a coordinated set of three grants sponsored by the Federal Aviation Administration and NASA Langley Research Center, one each with the Massachusetts Institute of Technology, Ohio University, and Princeton University. Completed works, status reports, and annotated bibliographies are presented for research topics, which include navigation, guidance, and control theory and practice, aircraft performance, human factors and air traffic management. An overview of the year's activities for each university is also presented.

  17. Canada-Nova Scotia Offshore Petroleum Board annual report, 1992-1993

    International Nuclear Information System (INIS)

    1993-06-01

    The Canada-Nova Scotia Offshore Petroleum Board was established as the agency responsible for the regulation of the hydrocarbon resources in the Nova Scotia offshore. The Board evaluates resource potential, administers petroleum exploration and production rights, approves offshore activities, and approves benefits and development plans. The main activities of the Board in 1992-1993 are summarized and financial statements are presented. Highlights include production of 572,300 m 3 of oil during the first production season of LASMO Nova Scotia Ltd.'s Cohasset development, the first commercial offshore oil production for Canada; four major resource evaluation projects in the Glenelg Field, the Laurentian sub-basin, the Fundy Rift Basin, and the Panuke Field; holding of discussions between Nova Scotia, Newfoundland, and Canada on the maritime boundary lines between respective offshore petroleum board jurisdictions, in the wake of a June 1992 determination of the disputed maritime boundary around St. Pierre et Miquelon; and amendments of certain safety-related legislation applicable to offshore operations. Employment benefits of the Cohasset project during 1992 totalled ca 470 Nova Scotians and 120 other Canadians. 3 tabs

  18. STAR electromagnetic calorimeter R ampersand D progress report, 1 October 1992--31 August 1993

    International Nuclear Information System (INIS)

    1993-01-01

    A lead-scintillator sampling electromagnetic calorimeter (EMC) is planned as an upgrade to the STAR detector for the RHIC Accelerator at Brookhaven National Laboratory (BNL). Considerable work on the conceptual design of the calorimeter, and related interfacing issues with the solenoids magnet and the time projection chamber (TPC) subsystems of STAR occurred in the period 1 October 1992 to 31 August 1993 (FY 1993). This report documents and summarizes the conclusions and progress from this work

  19. Brookhaven highlights. Report on research, October 1, 1992--September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Rowe, M.S.; Belford, M.; Cohen, A.; Greenberg, D.; Seubert, L. [eds.

    1993-12-31

    This report highlights the research activities of Brookhaven National Laboratory during the period dating from October 1, 1992 through September 30, 1993. There are contributions to the report from different programs and departments within the laboratory. These include technology transfer, RHIC, Alternating Gradient Synchrotron, physics, biology, national synchrotron light source, applied science, medical science, advanced technology, chemistry, reactor physics, safety and environmental protection, instrumentation, and computing and communications.

  20. Activity report. July 1992 - June 1993

    International Nuclear Information System (INIS)

    1993-09-01

    The Department of Physics and Measurement Technology, Biology and Chemistry (IFM) presents its 23nd consecutive annual progress report. It contains a brief description of activities in research and education within the department. The report is intended as an information for colleagues and institutions. The present report contains activities for the academic year July 1992 to June 1993. According to the present plans the erection of the new building will start in the beginning of 1994 and the construction time will be less than two years. The picture on the cover is taken from an ongoing research project at IFM. It shows a polymer light-emitting diode. A red polymer is sandwiched between a transparent conducting glass electrode and two narrow Aluminium electrodes. When a voltage of approximately 10 V is applied between the conducting glass electrode and one of the two Aluminium electrodes yellow-orange light is emitted from the polymer. Studies of these diodes are part of the activities in Applied Physics

  1. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2000-2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Kern, J. Chris; Ward, David L.; Farr, Ruth A. (Oregon Department of Fish and Wildlife)

    2002-02-01

    We report on our progress from April 2000 through March 2001 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), Columbia River Inter-Tribal Fish Commission (CRITFC; Report D), the U.S. Fish and Wildlife Service (USFWS; Report E), and Oregon State University (OSU; Report F). This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of our work from April 2000 through March 2001 are listed.

  2. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam, 1999-2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David L. (Oregon Department of Fish and Wildlife, Portland, OR)

    2001-04-01

    We report on our progress from April 1999 through March 2000 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), Columbia River Inter-Tribal Fish Commission (CRITFC; Report D), and the U.S. Fish and Wildlife Service (USFWS; Report E). This is a multi-year study with many objectives requiring more than one year to complete. Therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of our work from April 1999 through March 2000 are given.

  3. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 1998-1999 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David L.

    2000-12-01

    The authors report on their progress from April 1998 through March 1999 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), U.S. Fish and Wildlife Service (USFWS; Report D), Columbia River Inter-Tribal Fish Commission (CRITFC; Report E), and the University of Idaho (UI; Report F). This is a multi-year study with many objectives requiring more than one year to complete. Therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of our work from April 1998 through March 1999 are given.

  4. White sturgeon mitigation and restoration in the Columbia and Snake rivers upstream from Bonneville Dam, Annual Progress Report April 2006 - March 2007. Report C

    Science.gov (United States)

    Parsley, M.J.; Kofoot, P.

    2008-01-01

    Describe reproduction and early life history characteristics of white sturgeon populations in the Columbia River between Bonneville and Priest Rapids dams. Define habitat requirements for spawning and rearing white sturgeon and quantify the extent of habitat available in the Columbia River between Bonneville and Priest Rapids dams. Progress updates on young-of-the-year recruitment in Bonneville Reservoir and indices of white sturgeon spawning habitat for 2006 for McNary, John Day, The Dalles, and Bonneville dam tailrace spawning areas.

  5. The Secretary`s annual report to Congress: 1992--1993

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-31

    This report covers the years 1992 and 1993. Activities of all elements of the Department are described herein except those of the independent Federal Energy Regulatory Commission, which issues its own report. The report is divided into the following areas: energy efficiency; renewable energy; fossil energy; nuclear energy; civilian radioactive waste management; energy information; power marketing and energy production; defense programs; nonproliferation and national security; environmental management; general science and research; science education and technical information; laboratory management; technology transfer; human resources and administration; financial operations; public and consumer affairs; congressional and intergovernmental affairs; environmental, safety, and health; policy, planning, and program evaluation; general counsel; hearings and appeals; inspector general; field management; and economic impact and diversity.

  6. Precipitation data for water years 1992 and 1993 from a network of nonrecording gages at Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    Ambos, D.S.; Flint, A.L.; Hevesi, J.A.

    1995-01-01

    This report presents precipitation data collected in a storage gage network at Yucca Mountain, Nevada, from October 1, 1991, to September 30, 1993. The measured values indicate total accumulated precipitation for specified time intervals approximately corresponding to separate storm events. Installation of a precipitation monitoring network was initiated in January 1990, and was continually expanded and upgraded throughout the period ending in September 1993. The final network included 3 different gage types for a total of 133 gages at 108 locations within the three drainages overlying the potential repository site. Measured precipitation indicated above average accumulations for water years 1992 and 1993 relative to the most recent estimate of 6.7 inches for long-term average annual precipitation over the area of the network. The total precipitation averaged over the network in 1992 was about 8.2 inches with a maximum of about 11.2 inches measured at borehole USW GA-1. The total precipitation averaged over the network in 1993 was about 10.3 inches with a maximum of about 12.1 inches at neutron-access borehole UE-25 UZN number-sign 4

  7. Physics Division annual review, April 1, 1992--March 31, 1993

    International Nuclear Information System (INIS)

    Thayer, K.J.

    1993-08-01

    This document is the annual review of the Argonne National Laboratory Physics Division for the period April 1, 1992--March 31, 1993. Work on the ATLAS device is covered, as well as work on a number of others in lab, as well as collaborative projects. Heavy ion nuclear physics research looked at quasi-elastic, and deep-inelastic reactions, cluster states, superdeformed nuclei, and nuclear shape effects. There were programs on accelerator mass spectroscopy, and accelerator and linac development. There were efforts in medium energy nuclear physics, weak interactions, theoretical nuclear and atomic physics, and experimental atomic and molecular physics based on accelerators and synchrotron radiation

  8. World oil flow steady in 1992; stable market ahead for 1993

    International Nuclear Information System (INIS)

    Beck, R.J.

    1993-01-01

    World crude oil production in 1992 was virtually unchanged from 1991. Production last year averaged 59.96 million b/d, up only 17,000 b/d from 1991. Substantial production declines in the C.I.S. and U.S. were offset by increases among members of the Organization of Petroleum Exporting Countries and a number of other countries outside the OPEC sphere. Figures from the International Energy Agency (IEA) show world demand for petroleum products moved up 300,000 b/d to 66.9 million b/d. This included an addition to stocks of an estimated 1000,000 b/d. IEA predicts world demand will continue to rise in 1993 and OPEC output will advance to meet this higher level. Even though OPEC production is expected to be up for the year, seasonal swings in demand can cause price fluctuations. The paper describes OPEC production, non-OPEC production, oil prices, the world oil supply, Russian's decline, world demand, and the outlook for 1993

  9. Supporting Data Amended FY 1992/FY 1993 Biennial Budget Estimate Submitted to Congress - January 1992. Descriptive Summaries of the Research, Development, Test and Evaluation, Army Appropriation

    Science.gov (United States)

    1992-01-01

    dessert and snack items to increase acceptability and 31$,) UNCLASSIFIED UNCLASSIFIED AMENDED FY 1992/1993 BIENNIAL RDTE DESCRIPTIVE SUMMARY Program...Planned Program: " (U) Finalize development of non-organic and non-polluting processing bids for extruded and molded energetic materials * (U

  10. Work report 1992-1993 Instituto Nacional de Investigaciones Nucleares

    International Nuclear Information System (INIS)

    Instituto Nacional de Investigaciones Nucleares.

    1993-01-01

    During the term encompassed by this report, the ININ carried out the relevant actions in order to make progress in the achievement of the goals and objectives established in the 1990-1994 mid-term institutional program. The report is formed by 3 sections and one appendix: The first section is entitled: T he importance of the entity in the national economic context and the para state industrial sector (1992-1993) , which presents an approach of the functions taken on and performed by the institution among which the support given to the Central of Laguna Verde (CLV), from the Federal Electricity Commission, is stressed through qualification of personnel, processes and equipment and the operation of the pilot plant for the manufacture of fuel assemblies; technical courses; studies on the management of the nuclear fuel; classification of the equipment and components conferred to nuclear security functions; computer systems development; Reactor engineering; instrumentation and technical maintenance for radiological protection during the operation of unit I. The Institute conformed great part of the basic and applied research projects in several disciplines related to nuclear sciences. According to the indicative actions of the 1990-1994 national program for energy modernization, the priority activities of the Institute were oriented to the integral development of nuclear fuels; contribution to the security in nuclear and radiative facilities; collection, treatment and storage of radiative disposal; the development of nuclear techniques applied in the health, agricultural and industrial sectors, are some of the points considered in the second section. Regarding the structural change, progress and results for the 1992-1993 term considered in the third section, it is established that the Institute continued with its actions of the modernization program established for the term and the beginning of the study of integral restructuring, to identify the new fields of action

  11. Manchester University: report: nuclear physics, January 1992-December 1993

    International Nuclear Information System (INIS)

    1994-01-01

    This report describes the experimental research of the Manchester Nuclear Physics Group for the period January 1992 to January 1993. The chief areas are radioactive beams, improved techniques for analysis of multifold γ-coincidence data, and the development of improved heavy-ion detection systems. We are designing and building systems for measuring the radioactive beams and have been making measurements of the backgrounds to be encountered with and without beam at the measuring sites. Construction of the heavy-ion spectrometer HIPS is nearly complete, and it is intended to use it in conjunction with the TESSA array to observe γ rays in coincidence with deep-inelastic reaction products from the Jvaskyla cyclotron. Work is also proceeding on novel ways to use Ge detectors as γ-ray polarimeters and as position-sensitive devices. (author)

  12. Ongevallen in Nederland, opnieuw gemeten : een enquête-onderzoek in de periode augustus 1992 - augustus 1993.

    NARCIS (Netherlands)

    Mulder, S. Bloemhoff, A. Harris, S. Kampen, L.T.B. van & Schoots, W.

    1995-01-01

    Because of the lack of accurate data on injury-producing accidents in The Netherlands a telephone survey was conducted from August 1992 until July 1993. This was the first repeat of a comparable survey carried out in 1986/1987. More than 25.000 households containing over 67.000 persons, were

  13. DOE Hydropower Program biennial report 1992--1993 (with an updated annotated bibliography)

    Energy Technology Data Exchange (ETDEWEB)

    Cada, G.F.; Sale, M.J. [Oak Ridge National Lab., TN (United States); Francfort, J.E.; Rinehart, B.N.; Sommers, G.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States)

    1993-07-01

    This report, the latest in a series of annual/biennial Hydropower Program reports sponsored by the US Department of Energy, summarizes the research and development and technology transfer activities of fiscal years 1992 and 1993. The report discusses the activities in the four areas of the hydropower program: Environmental research; resource assessment; research coat shared with industry; and technology transfer. The report also offers an annotated bibliography of reports pertinent to hydropower, written by persons in Federal and state agencies, cities, metropolitan water districts, irrigation companies, and public and independent utilities. Most reports are available from the National Technical Information Service.

  14. Rural migration in Nevada: Lincoln County. Phase 1, 1992--1993

    Energy Technology Data Exchange (ETDEWEB)

    Soden, D.L.; Carns, D.E.; Mosser, D.; Conary, J.S.; Ansell, J.P.

    1993-12-31

    The principal objective of this project was to develop insight into the scope of migration of working age Nevadans out of their county of birth; including the collection of data on their skill levels, desire to out or in-migrate, interactions between families of migratory persons, and the impact that the proposed high-level nuclear waste repository at Yucca mountain might have on their individual, and collective, decisions to migrate and return. The initial phase of this project reported here was conducted in 1992 and 1993 in Lincoln County, Nevada, one of the counties designated as ``affected`` by the proposed repository program. The findings suggest that a serious out-migration problem exists in Lincoln County, and that the Yucca mountain project will likely affect decisions relating to migration patterns in the future.

  15. Can our people afford to live? The effect of changing economic conditions on high density urban dwellers around Harare, March 1992 to June 1993.

    Science.gov (United States)

    Watts, T E

    1994-10-01

    The Department of Community Medicine with the assistance of fourth year medical students have been monitoring the basic cost of living of high density urban dwellers near Harare from March 1992 to June 1993. The cheapest diet able to provide sufficient calories, protein and vitamin A for a standard family of five people was calculated, and also the average cost of rent, rates, essential travel and schooling for a month. Sixty to 80 people were interviewed on each of four occasions. The cost of basic foods increased by over 50 pc from $157.50 in March 1992 to $349.20 in June 1993, and the cost of rents, rate, transport and schooling from $230.63 to $268.43 in the same period. This gave an average total monthly cost of $388.18 in March 1992 and $617.63 in June 1993. Minimum costs were calculated by using the mean cost of rent and rates etc.--2 standard errors. This increase in the basic cost of living is compared with the wages of security guards and the implications regarding the affordability of health care.

  16. Annual report of Radiation Effects Research Foundation, April 1, 1992 - March 31, 1993

    International Nuclear Information System (INIS)

    1994-01-01

    This is an annual report concerning research activities and achievement in the Radiation Effects Research Foundation (RERF) in Japan during the period April 1, 1992-March 31, 1993. Twenty-nine reports, including integrated report on the incidence of solid tumors (surveyed during the period 1958-1987) and the report on the incidence of leukemia (surveyed during the period 1950-1987), were approved in the fiscal year 1992. The present report deals with scientific achievement of each division of RERF; various activities including international cooperation programs, disease monitoring workshop, lectures, and in-house seminars; abstracts of new research topics, achievement reports, and review reports; a list of publications and presentations by staff members in academic meetings; and RERF organization affairs including activities, financial aspects, and a list of visitors to RERF. An Appendix gives the proceedings; a brief summary of disease monitoring workshop; ongoing and completed research topics; and a list of RERF personnel. (N.K.)

  17. Pacific Northwest Laboratory facilities radionuclide inventory assessment CY 1992-1993

    International Nuclear Information System (INIS)

    Sula, M.J.; Jette, S.J.

    1994-09-01

    Assessments for evaluating compliance with airborne radionuclide emission monitoring requirements in the National Emission Standards for Hazardous Air Pollutants (NESHAPs - U.S. Code of Federal Regulations, Title 40 Part 61, Subparts H and I) were performed for 33 buildings at the U.S. Department of Energy's (DOE) Pacific Northwest Laboratory on the Hanford Site, and for five buildings owned and operated by Battelle, Pacific Northwest Laboratories in Richland, Washington. The assessments were performed using building radionuclide inventory data obtained in 1992 and 1993. Results of the assessments are summarized in Table S.1 for DOE-PNL buildings and in Table S.2 for Battelle-owned buildings. Based on the radionuclide inventory assessments, four DOE-PNL buildings (one with two emission points) require continuous sampling for radionuclides per 40 CFR 61. None of the Battelle-owned buildings require continuous emission sampling

  18. Analysis of the activities of radiopharmaceuticals and the radiation burden to the Slovak population in 1992-1993 from nuclear medicine diagnostic examinations

    International Nuclear Information System (INIS)

    Ftacnikova, S.; Fulop, M.

    1995-01-01

    By means of questionnaires sent out to all nuclear medicine departments in Slovakia, the authors assessed the mean values and the range of activities of radiopharmaceuticals administered during diagnostic examinations in nuclear medicine, and calculated the overall effective dose and effective dose per radiodiagnostic examination in 1992 and 1993. The mean values of activities are comparable with activities administered in the Czech Republic, in western European countries and the USA. The values of the overall effective dose and the mean effective dose per examination in 1992 were 110.7 Sv and 3.98 mSv, the corresponding values in 1993 were 101.5 Sv and 3.45 mSv. These values are comparable with those in developed countries. (author) 6 tabs., 1 fig., 13 refs

  19. Fusion programs in applied plasma physics. Technical progress report, July 11, 1992--May 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-07-01

    This report summarizes the progress made in theoretical and experimental research funded by US Department of Energy Grant No. DE-FG03-92ER54150, during the period July 11, 1992 through May 31, 1993. Four main tasks are reported: applied plasma physics theory, alpha particle diagnostic, edge and current density diagnostic, and plasma rotation drive. The report also discusses the research plans for the theory and experimental programs for the next grant year. Reports and publications supported by the grant during this period are listed in the final section.

  20. Hydro-Quebec annual report, 1993

    International Nuclear Information System (INIS)

    1994-01-01

    An overview is presented of the activities of Hydro-Quebec for the year ended December 31, 1993, as well as its financial status. Export sales of electricity to other Canadian provinces and the USA are reported. Research programs and demonstration projects are described, as well as the utility's international activities. Environmental and economic considerations for the province are presented. Financial data includes total sales, sales by sector, export sales, and rate changes. A financial statement is included. In 1993, total sales volume was 152.1 TWh, or 7.5 TWh more than in 1992, for a total sales revenue of $7,004 million, an increase of 3.5% over 1992. Sales in Quebec increased 5 TWh, with nearly all of this increase coming from the industrial sector. Exports outside of Quebec totalled 15 TWh, or 20% more than in 1992. The largest increase in exports was in the form of short-term sales to the USA. Expenditures in 1993 were $3,761 million, only slightly more than in 1992. Facilities commissioned in 1993 included the Brisay power plant, two of six units at the Laforge-1 plant, and the north portion of the 12th transmission line from the LaGrande complex. Total installed capacity of the Hydro-Quebec system reached 29,131 MW, and total power produced was 131.6 TWh. Total length of transmission and distribution lines in 1993 reached 29,869 km and 100,908 km respectively. 9 figs., 17 tabs

  1. Annual report 1992-1993

    International Nuclear Information System (INIS)

    1993-01-01

    The 1992-93 Annual Report of the NRPB includes the Director's Review, the NRPB's involvement in developing radiation safety standards and providing various technical services. The NRPB's work in environmental sciences, biomedical sciences and physical sciences is also briefly reviewed. Details are also given of the various NRPB documents containing formal advice on standards and protection, and finally the NRPB's finances are outlined. (UK)

  2. Nitrogen from mountain to fjord - Annual report 1993; Nitrogen fra fjell til fjord. Aarsrapport 1993

    Energy Technology Data Exchange (ETDEWEB)

    Kaste, Oe; Bechmann, M; Toerset, K

    1994-07-01

    ``Nitrogen from mountain to fjord`` is an interdisciplinary research programme which studies the nitrogen cycle from deposition to discharge into the sea. The project includes investigation of the nitrogen budgets for two catchments and selected areas of mountain, heath, forest, crop land and fresh water. The main purpose of the project is to increase the knowledge of uptake and runoff of nitrogen and thus to improve the prediction of future effects on soil, forest, fresh water and fjords. The activities are concentrated about two water courses in Norway: Bjerkreimsvassdraget and Aulivassdraget. In Bjerkreimsvassdraget the nitrate concentration changed only little from 1992 to 1993. Relatively large variations in the nitrate concentrations were found in the forest and heath areas of the system. In Aulivassdraget the nitrogen concentration has changed considerably in 1992 and 1993. The maximum concentration measured in the main river was 13.2 mg N/l. In autumn 1992 and spring 1993 much nitrogen remained in the soil after the poor harvest of 1992 and at that time much nitrogen was carried away by the runoff. 16 refs., 19 figs., 16 tabs.

  3. FY93 Princeton Plasma Physics Laboratory. Annual report, October 1, 1992--September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1995-02-01

    This is the annual report from the Princeton Plasma Physics Laboratory for the period October 1, 1992 to September 30, 1993. The report describes work done on TFTR during the year, as well as preparatory to beginning of D-T operations. Design work is ongoing on the Tokamak Physics Experiment (TPX) which is to test very long pulse operations of tokamak type devices. PBX has come back on line with additional ion-Bernstein power and lower-hybrid current drive. The theoretical program is also described, as well as other small scale programs, and the growing effort in collaboration on international design projects on ITER and future collaborations at a larger scale.

  4. FY93 Princeton Plasma Physics Laboratory. Annual report, October 1, 1992--September 30, 1993

    International Nuclear Information System (INIS)

    1995-01-01

    This is the annual report from the Princeton Plasma Physics Laboratory for the period October 1, 1992 to September 30, 1993. The report describes work done on TFTR during the year, as well as preparatory to beginning of D-T operations. Design work is ongoing on the Tokamak Physics Experiment (TPX) which is to test very long pulse operations of tokamak type devices. PBX has come back on line with additional ion-Bernstein power and lower-hybrid current drive. The theoretical program is also described, as well as other small scale programs, and the growing effort in collaboration on international design projects on ITER and future collaborations at a larger scale

  5. War damages and reconstruction of Peruca dam

    International Nuclear Information System (INIS)

    Nonveiller, E.; Sever, Z.

    1999-01-01

    The paper describes the heavy damages caused by blasting in the Peruca rockfill dam in Croatia in January 1993. Complete collapse of the dam by overtopping was prevented through quick action of the dam owner by dumping clayey gravel on the lowest sections of the dam crest and opening the bottom outlet of the reservoir, thus efficiently lowering the water level. After the damages were sufficiently established and alternatives for restoration of the dam were evaluated, it was decided to construct a diaphragm wall through the damaged core in the central dam part as the impermeable dam element and to rebuild the central clay core at the dam abutments. Reconstruction works are described

  6. Centre for Particle Physics of Marseille. 1992-1993 Activity report

    International Nuclear Information System (INIS)

    1994-01-01

    The Center for particle physics of Marseilles (CPPM) is one of the laboratories of the National Institute of Nuclear Physics and Particle Physics of the CNRS which gathers the means of the particle physics studies. The laboratory is a mixed research unit which concerns at the same time the CNRS/IN2P3 and the Aix-Marseille University. The principal role of the laboratory is fundamental research in particle physics which deals with the elementary components of the matter and their interactions; astro-particles physics i.e. observation of the elementary particles in the Universe and in observational cosmology to understand the universe behaviour through the observation and study of supernovas. This document is the 1992-1993 Activity report of the CPPM. It presents the experiments in which the CPPM is involved (Aleph, Atlas, Bugey, CPLear, Delphi), the training, teaching, industrial relations/valorisation and technical activities (electronics, computers and information technology, mechanics), and the list of publications (seminars, conference papers, journal articles, dissertations) of the Centre. A list of internal seminars and of the CPPM staff is attached to the document

  7. IEA Statistics 1993: electricity information

    International Nuclear Information System (INIS)

    1994-01-01

    Gross electricity production in 1993 in the OECD (including generation from pumped storage plants) was 7 466 TWh, a rise of 1.2 per cent from the level of gross production in 1992 (Tables 1 and 3). Nuclear plants accounted for 24.2 per cent of total gross electricity production in 1993, hydroelectric plants 16.7 per cent, total thermal plants 58.7 per cent and geothermal and other renewables 0.4 per cent. In 1992 total OECD heat production that is sold to third parties by public producers was 25 Mtoe (Table 6). About 86 per cent of this heat (21.6 Mtoe) was produced in CHP plants, about 12 per cent (3.1 Mtoe) in heat plants, and the remainder (0.3 Mtoe) in nuclear power plants (in Canada and Switzerland only). Based on preliminary data, apparent consumption of electricity (gross production plus imports less exports) in 1993 in OECD was 7 474 TWh. The corresponding figure for 1992 was 7 379 TWh, indicating a rise of 1.3 per cent in apparent electricity consumption in OECD countries in 1993. OECD countries imported a total of 219 TWh of electricity in 1993 (including from other OECD countries) and exported 211 TWh (including to other OECD countries). Accordingly, net imports of electricity in 1993 amounted to 7.7 TWh. Real electricity prices (as measured by the indices of real energy prices) in the OECD fell slightly in 1993 from 1992 levels for both industry and household end-users (Table 20). Electricity prices for industrial consumers vary widely across OECD countries. Based on data that are available for 1993, prices varied from 3.3 US cents per kWh in New Zealand to 12.1 US cents per kWh in Portugal. Electricity prices for industry are reported in Tables 24 and 25. Electricity prices for domestic consumers also vary widely across OECD countries. Based on data that are available for 1993, prices varied from 5.8 US cents per kWh in New Zealand to 18.0 US cents per kWh in Denmark (Tables 26 and 27)

  8. Progress report on safety research on radioactive waste management for the period April 1992 to March 1993

    International Nuclear Information System (INIS)

    Muraoka, Susumu; Senoo, Muneaki; Sekine, Keiichi

    1994-03-01

    This report summarizes the research and development activities on radioactive waste management at the Engineered Barrier Materials Laboratory, Shallow Land Migration Laboratory, Environmental Geochemistry Laboratory and Environmental Radiochemistry Laboratory of the Department of Environmental Safety Research during the fiscal year of 1992 (April 1, 1992-March 31, 1993). The topics are as follows: 1) As for waste forms and engineered barrier material, performance assessment studies were carried out on various waste forms, buffer materials and mortar. 2) In the safety evaluation study for shallow land disposal, migration behavior in the soil layer were studied. 3) In the safety evaluation study for geological disposal, chemical behavior of nuclide in water, nuclide migration and fixation in geosphere were studied. 4) Distribution of uranium and migration of uranium series nuclide in uranium ore were examined as a natural analogue study. (author)

  9. Electric industry in 1992

    International Nuclear Information System (INIS)

    1993-01-01

    The production of electricity in 1992 is analyzed. The increase (0,4%) of electricity consumption and the decrease of its production are the main characteristics of 1993 in Spain. These aspect with the UNESA data are studied. In 1992 30000 Kw of 216.505 Kw total were produced by wind mills

  10. Oldman River Dam wildlife habitat mitigation program, Pincher Creek, Alberta: Final report. Summary of the implementation phase, 1987--1993

    International Nuclear Information System (INIS)

    1998-01-01

    This article summarizes the 1987--1993 implementation phase of the Oldman River Dam Wildlife Habitat Mitigation Program, intended to offset the negative impact of dam construction and operation on plant and animal species. Projects carried out during the program included creation of wetlands, tree and shrub planting, installation of snow and wildlife fences, and installation of replacement nesting sites for birds. Summaries are provided of the process that led to the final program design, the projects undertaken to complete the program, the design strategies, and the proposed habitat mitigation projects. Also included are an inventory of completed projects, an evaluation of the program's success in meeting its objectives and of the mitigation techniques used in the program, and a recommended strategy for future management of the program. Appendices include habitat suitability index models, summaries of related reports, vegetation maps, and a grazing management plan

  11. Energy consumption declined in 1993

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    On presenting the energy consumption figures for 1993 the Minister for Economic Affairs of Baden-Wuerttemberg Dieter Spoeri (SPD) spoke of the eternal task of saving energy. In his view the slight decline in energy consumption from 1992 to 1993 should not be interpreted as a greater willingness to save energy; its main cause is rather to be seen in the course of the economy. According to estimations, total energy consumption fell 0.5% and electricity consumption 1.0% from 1992 to 1993. The economy on the other hand, still a decisive factor in energy consumption, is estimated to have declined 3% during that period. In the ten years from 1983 to 1993 total energy consumption in the Land rose an average annual 1.8% while electricity consumption kept astride with the economy with an average annual rise 2.7%, he said. (orig./HP) [de

  12. British Columbia Petroleum Corporation annual report 1992-1993

    International Nuclear Information System (INIS)

    1993-01-01

    The British Columbia Petroleum Corporation is a provincial Crown agency whose principal mandate is to facilitate and monitor the sale of natural gas, and to act as a central source of information specific to the natural gas industry for the benefit of all industry participants. The Corporation's activities for the year ending March 31, 1993 are summarized. With the devolution of the Corporation's marketing functions in 1990 to CanWest Gas Supply Inc. and the deregulation of the natural gas market, the Corporation no longer markets natural gas and byproducts, but performs a number of administrative functions on behalf of the province. These include issuing acquisition orders and determining the respective netback prices for the purpose of calculating royalties; collection of a production-related levy; collection of data regarding all sale transactions; monitoring of all production, sales and marketing costs; and information gathering for all sectors of the industry. In 1992/93, a total of 27 companies remained with the Corporation, representing 111 individual gas purchase agreements for a combined deliverability of 1,769,300 m 3 /d. At fiscal year end, a total of 713 acquisition orders were being monitored and 20 findings of producer support were issued in response to netback sales applications. Industry volume throughputs increased 8.7% over the previous year and the average netback price rose to $44.87 per 1,000 m 3 . Financial statements are included. 2 figs., 1 tab

  13. Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    DeHart, Michele (Columbia Basin Fish and Wildlife Authority, Fish Passage Center, Portland, OR)

    2004-09-01

    The runoff volumes in 2003 were below average for the January to July period above Lower Granite Dam (79%) and The Dalles Dam (82%). The year 2003 hydrosystem operations and runoff conditions resulted in flows that met the spring seasonal Biological Opinion flow objectives at Lower Granite Dam, McNary Dam and Priest Rapids Dam. However, summer seasonal flows at Lower Granite Dam and McNary Dam were considerably below the Biological Opinion objectives of 50.7 Kcfs at Lower Granite Dam and 2000 Kcfs at McNary Dam. Actual summer seasonal flows were just 32.3 Kcfs and 135.5 Kcfs, respectively. In most instances spill was provided as described by the Biological Opinion program for fish passage, within the constraints of the State waivers for total dissolved gas supersaturation levels. Spill was altered during spill testing and most notably during the month of August at Ice Harbor dam. At this project spill was modified from a 24-hour program to a 12-hour nightly spill period pending the evaluation of studies being conducted in-season. Spill was not returned to full implementation of the Biological Opinion levels even after data showed that spillway passage had the highest associated fish survival. This experience demonstrated the difficulty of managing the hydrosystem for fish passage based on preliminary data and data collected in-season. Increased hatchery releases and higher wild fish production resulted in a population of yearling chinook at Lower Granite Dam being one of the highest observed in recent years. However, the increased hatchery production may have been offset to some extent by decreased survival from release to Lower Granite Dam as suggested by the lower than average survival observed for the PIT tagged trap released fish to Lower Monumental Dam. Travel times were also longer for hatchery spring chinook compared to recent past years. The short duration of high flows that occurred in the Lower Snake River was too late for yearling chinook, but likely was

  14. Institute of Nuclear physics of Lyon - IPNL, Activity Report 1992-1993

    International Nuclear Information System (INIS)

    1994-01-01

    The Institute of Nuclear physics of Lyon (IPNL) is under the joint supervision of the Claude Bernard University of Lyon (UCBL) and the National Institute of Nuclear and particle physics (IN2P3) of the CNRS (National Centre for Scientific Research). The laboratory studies the properties and interactions of sub-atomic particles. Its activities are largely experimental, with groups involved in a wide range of national and international collaborations concerning particle and astro-particle physics, nuclear matter and the interactions of ions and cluster with matter. In addition, the Institute has important interdisciplinary and applied research activities related to: detectors R and D, confinement of radioactive waste, bio-medical imaging, measurement of environmental levels of radioactive elements. This document presents the activity of the Centre during the 1992-1993 years: 1 - Quarks and Leptons; 2 - Hadronic matter; 3 - Hadrons and Astro-particles; 4 - Theoretical physics; 5 - Ions/clusters-matter; 6 - Surface treatment/characterization; 7 - R and D, Instrumentation; 8 - Technical services (Accelerators, Computers, electronics, Mechanics); 9 - Training, communication; 10 - PhDs, publications, conferences, reports; 11 - Conference papers, lectures, seminars

  15. Yucca Mountain Biological Resources Monitoring Program. Progress report, October 1992--December 1993

    International Nuclear Information System (INIS)

    1994-05-01

    The US Department of Energy (DOE) is required by the Nuclear Waste Policy Act of (as amended in 1987) to study and characterize the suitability of Yucca Mountain as a potential geologic repository for high-level nuclear waste. During site characterization, the DOE will conduct a variety of geotechnical, geochemical, geological, and hydrological studies to determine the suitability of Yucca Mountain as a potential repository. To ensure that site characterization activities do not adversely affect the environment at Yucca Mountain, a program has been implemented to monitor and mitigate potential impacts and ensure activities comply with applicable environmental regulations. This report describes the activities and accomplishments of EG ampersand G Energy Measurements, Inc. (EG ampersand G/EM) from October 1992 through December 1993 for six program areas within the Terrestrial Ecosystem component of the environmental program for the Yucca Mountain Site Characterization Project (YMP): Site Characterization Effects, Desert Tortoises (Gopherus agassizii), Habitat Reclamation, Monitoring and Mitigation, Radiological Monitoring, and Biological Support

  16. Industry Study Report 1992-1993

    Science.gov (United States)

    1993-01-01

    are the wild card in any future market performance calculations. While advertised as a one-time exception for the INMARSAT contract, the 1992 decision...chart presenting the Mercedes - Benz Training program. 14-13 The U.S., by contrast, has no program of standardized tests SCHOOL-T -WORK or...Japan for small components, $250 to Britain for advertising and marketing services, and about $50 to Ireland and Barbados for data processing. (Robert

  17. AECL annual review 1992 - 1993

    International Nuclear Information System (INIS)

    1993-01-01

    1992/93 was a pivotal year for AECL, with the redirection of its strategic plan, the refocussing of its corporate mission, a change in its structural organization to meet new challenges, the contract with South Korea for Wolsong Units 3 and 4 and the Memorandum of Understanding with Saskatchewan. AECL looks forward to the next 12 months as a time of opportunity, confident in the knowledge that they possess the means to succeed. ills

  18. AECL annual review 1992 - 1993

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    1992/93 was a pivotal year for AECL, with the redirection of its strategic plan, the refocussing of its corporate mission, a change in its structural organization to meet new challenges, the contract with South Korea for Wolsong Units 3 and 4 and the Memorandum of Understanding with Saskatchewan. AECL looks forward to the next 12 months as a time of opportunity, confident in the knowledge that they possess the means to succeed. ills.

  19. Determination of elements in the atmosphere of Valle de Toluca by Neutron Activation (July 1992 - April 1993)

    International Nuclear Information System (INIS)

    Garcia S, I.

    1994-01-01

    The purpose of this study is to continue with the environmental monitoring program of Valle de Toluca by means of the Neutron Activation Analysis and atomic absorption techniques. The analytical results corresponding to the period of July 1992 to April 1993, and the analyzed elements by Neutron Activation were Na, V, Br, Al and Mn, while Cr and Pb were analyzed by Atomic Absorption Spectroscopy. Since the study is a joint project with the Facultad de Quimica de la Universidad Autonoma del Estado de Mexico, the purpose is to continue with this type of chemical analysis. (Author)

  20. Survival Estimates for the Passage of Juvenile Chinook Salmon through Snake River Dams and Reservoirs, 1993 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Iwamoto, Robert N.; Sandford, Benjamin P.; McIntyre, Kenneth W.

    1994-04-01

    A pilot study was conducted to estimate survival of hatchery-reared yearling chinook salmon through dams and reservoirs on the Snake River. The goals of the study were to: (1) field test and evaluate the Single-Release, Modified-Single-Release, and Paired-Release Models for the estimation of survival probabilities through sections of a river and hydroelectric projects; (2) identify operational and logistical constraints to the execution of these models; and (3) determine the usefulness of the models in providing estimates of survival probabilities. Field testing indicated that the numbers of hatchery-reared yearling chinook salmon needed for accurate survival estimates could be collected at different areas with available gear and methods. For the primary evaluation, seven replicates of 830 to 1,442 hatchery-reared yearling chinook salmon were purse-seined from Lower Granite Reservoir, PIT tagged, and released near Nisqually John boat landing (River Kilometer 726). Secondary releases of PIT-tagged smolts were made at Lower Granite Dam to estimate survival of fish passing through turbines and after detection in the bypass system. Similar secondary releases were made at Little Goose Dam, but with additional releases through the spillway. Based on the success of the 1993 pilot study, the authors believe that the Single-Release and Paired-Release Models will provide accurate estimates of juvenile salmonid passage survival for individual river sections, reservoirs, and hydroelectric projects in the Columbia and Snake Rivers.

  1. Survival estimates for the passage of juvenile chinook salmon through Snake River dams and reservoirs. Annual report 1993

    International Nuclear Information System (INIS)

    Iwamoto, R.N.; Muir, W.D.; Sandford, B.P.; McIntyre, K.W.; Frost, D.A.; Williams, J.G.; Smith, S.G.; Skalski, J.R.

    1994-04-01

    A pilot study was conducted to estimate survival of hatchery-reared yearling chinook salmon through dams and reservoirs on the Snake River. The goals of the study were to: (1) field test and evaluate the Single-Release, Modified-Single-Release, and Paired-Release Models for the estimation of survival probabilities through sections of a river and hydroelectric projects; (2) identify operational and logistical constraints to the execution of these models; and (3) determine the usefulness of the models in providing estimates of survival probabilities. Field testing indicated that the numbers of hatchery-reared yearling chinook salmon needed for accurate survival estimates could be collected at different areas with available gear and methods. For the primary evaluation, seven replicates of 830 to 1,442 hatchery-reared yearling chinook salmon were purse-seined from Lower Granite Reservoir, PIT tagged, and released near Nisqually John boat landing (River Kilometer 726). Secondary releases of PIT-tagged smolts were made at Lower Granite Dam to estimate survival of fish passing through turbines and after detection in the bypass system. Similar secondary releases were made at Little Goose Dam, but with additional releases through the spillway. Based on the success of the 1993 pilot study, the authors believe that the Single-Release and Paired-Release Models will provide accurate estimates of juvenile salmonid passage survival for individual river sections, reservoirs, and hydroelectric projects in the Columbia and Snake Rivers

  2. Near-Earth Asteroid Physical Observations: 1993-1995

    Science.gov (United States)

    Skiff, B. A.; Buie, M. W.; Bowell, E.

    1996-09-01

    In September 1993, we initiated a regular program of photometric observations of Near-Earth objects. Since that time we have been allocated 5-7 nights per month at the 42'' Hall telescope at Anderson Mesa. There are three goals of our observing program for each asteroid: (1) to obtain an accurate rotation period and characterization of the lightcurve, (2) to obtain the surface color, and (3) to measure the photometric parameters, H and G. All of the lightcurve observations are made in Kron-Cousins R and we always obtain a V-R color. Limited ECAS colors are also obtained when the objects are bright enough. We have secured periods for 9 asteroids, 1864 Daedalus, 1866 Sisyphus, 3200 Phaethon, 4954 Eric, 5693 (1993 EA), 5836 (1993 MF), 6489 (1991 JX), 1993 QP, and 1993 WD. Some of these periods are a confimation of an earlier result but most are new. We obtained colors for all these objects as well as four additional asteroids, 5407 (1992 AX), 1993 UC, 1993 VW, and 1994 LW. We have additional (as yet unreduced) observations of 2062 Aten, 2212 Hephaistos, 3752 Camillo, 5143 Heracles, 5863 (1983 RB), 6053 (1993 BW3), 7025 (1993 QA), 7092 (1992 LC), 1989 VA, 1992 TC, 1994 RC, and 1995 YA3. The fastest rotation period we find is 2.402 hours for 1866 Sisyphus and the slowest is 93QP at ~ 24 hours. The colors for these objects range from V-R=0.34 for 3200 Phaethon to V-R=0.49 for 1866 Sisyphus and 4954 Eric. Most colors fall near V-R=0.43. These observations should help to provide a more complete understanding of the surface properties and rotational states of the Near-Earth asteroids. This work was supported by NASA Grant NAGW-1470.

  3. Acidentes de trabalho em Barcelona (Espanha, no período de 1992-1993 Work accidents in Barcelona (Spain, from 1992 to 1993

    Directory of Open Access Journals (Sweden)

    Rosana F. Sampaio

    1998-08-01

    Full Text Available INTRODUÇÃO: As estatísticas dos acidentes de trabalho, como qualquer outro sistema de notificação, devem servir de base para determinar prioridades e decidir quais medidas preventivas devem ser adotadas. Neste contexto, o objetivo do estudo é aprofundar a análise dos acidentes de trabalho através da utilização de técnicas estatísticas descritivas que permitam estabelecer a relação entre o número de acidentes de trabalho ocorridos em Barcelona (Espanha e as variáveis tipo de acidente, setor econômico, tamanho da empresa e tipo de contrato. MÉTODO: Como fonte de dados foi utilizado o sistema de notificação de acidentes graves e mortais ocorridos na cidade de Barcelona (Espanha, entre 1992 e 1993. Foram examinados 848 registros de acidentes de trabalho em trabalhadores do sexo masculino e a partir desses dados efetuou-se uma análise mediante modelos log-lineares. RESULTADOS E CONCLUSÕES: Os resultados evidenciam que os acidentes traumáticos e o setor de construção têm uma associação positiva, verificada, da mesma forma, entre os acidentes de trânsito e o setor de serviços. Os acidentes traumáticos e de trânsito apresentaram uma associação com as pequenas empresas e os acidentes não traumáticos demonstraram associar-se com as grandes empresas. Verificou-se, ainda, associação entre os trabalhadores temporais e o setor da construção frente aos trabalhadores com contrato fixo, em que se constatou uma associação com os setores de indústria e de serviços. Foi verificada associação positiva entre os acidentes ocorridos com os trabalhadores temporais e as pequenas e médias empresas.INTRODUCTION: The statistics related to labor accidents as with any other notification system ought to be the basis for programs and policies with a view to the adoption of preventive measures. In order to establish preventive norms, however, the health system needs data from researchers focussing on the dynamics of and the pitfalls

  4. Verkeersongevallen in Nederland 1992-1993 : eindrapport.

    NARCIS (Netherlands)

    Kampen, L.T.B. van & Harris, S.

    1995-01-01

    The Transport Research Centre of the Ministry of Transport (AVV) commissioned the Institute for Road Safety Research SWOV to participate in the second `Accidents in the Netherlands' survey. The telephone interviews of more than 25.000 households were carried out during the period from August 1992 to

  5. Financial Audit. Federal Family Education Loan Program's Financial Statements for Fiscal Years 1993 and 1992. Report to the Congress and the Secretary of Education.

    Science.gov (United States)

    General Accounting Office, Washington, DC.

    This report presents findings of an audit of the Principal Statements of the Department of Education's (ED) Federal Family Education Loan Program (FFELP) and its internal controls and compliance with laws and regulations for the fiscal years ending September 30, 1993, and September 30, 1992. The audit investigated whether the Principal Statements…

  6. Industry adjusts 1992 E and P budgets

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that a midyear update of Salomon Bros. survey of the petroleum industry's 1992 exploration and production budgets pinpoints the ways operators are adjusting outlays to match the times. The New York financial firm's latest tally shows: Operators have made deep cuts in their 1992 US and Canadian E and P budgets since yearend 1991. Moderate increases budgeted earlier for E and P outside North America are intact. Many companies substantially underspent their budgets in first half 1992. In Salomon Bros. Largest survey---247 companies responded---operators the they were budgeting a 3.2% year to year decline in their 1992 worldwide E and P spending, compared with a 1.3% increase planned for 1992 in December 1991. The decline in spending falls entirely in North America. Preliminary indications suggest that 1993 E and P spending will be relatively flat in the US and flat to moderately increased in Canada. Elsewhere, spending should continue to rise steadily in 1993, Salomon Bros. The. Budgets exclude producing property purchases and merger or acquisition of other companies when possible

  7. Center for Beam Physics, 1992

    International Nuclear Information System (INIS)

    1993-06-01

    This report contains the following information on the center for beam physics: Facilities; Organizational Chart; Roster; Profiles of Staff; Affiliates; Center Publications (1991--1993); and 1992 Summary of Activities

  8. Center for Beam Physics, 1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    This report contains the following information on the center for beam physics: Facilities; Organizational Chart; Roster; Profiles of Staff; Affiliates; Center Publications (1991--1993); and 1992 Summary of Activities.

  9. Yucca Mountain Site Characterization Project bibliography, 1992--1993. Supplement 4

    International Nuclear Information System (INIS)

    1992-06-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Energy Science and Technology Database from January 1, 1992, through December 31, 1993. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it. Earlier information on this project can be found in the first bibliography DOE/TIC-3406, which covers 1977--1985, and its three supplements DOE/OSTI-3406(Suppl.1), DOE/OSTI-3406(Suppl.2), and DOE/OSTI-3406(Suppl.3), which cover information obtained during 1986--1987, 1988--1989, and 1990--1991, respectively. All entries in the bibliographies are searchable online on the NNW database file. This file can be accessed through the Integrated Technical Information System (ITIS) of the US Department of Energy (DOE)

  10. Site characterization progress report: Yucca Mountain, Nevada, October 1, 1992--March 31, 1993, No. 8

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-08-01

    In accordance with requirements of Section 113(b)(3) of the Nuclear Waste Policy Act of 1982, as amended, and 10 CFR 60.18(g), the US Department of Energy has prepared this report on the progress of site characterization activities at Yucca Mountain, Nevada, for the period October 1, 1992, through March 31, 1993. This report is the eighth in a series issued at intervals of approximately six months during site characterization of Yucca Mountain as a possible site for a geologic repository for the permanent disposal of high-level radioactive waste. Also included in this report are activities such as public outreach and international programs that are not formally part of the site characterization process. Information on these activities is provided to report on all aspects of the Yucca Mountain studies.

  11. Survival estimates for the passage of juvenile salmonids through Snake River dams and reservoirs, 1996. Annual report

    International Nuclear Information System (INIS)

    Smith, S.G.; Muir, W.D.; Hockersmith, E.E.; Achord, S.; Eppard, M.B.; Ruehle, T.E.; Williams, J.G.

    1998-02-01

    In 1996, the National Marine Fisheries Service and the University of Washington completed the fourth year of a multi-year study to estimate survival of juvenile salmonids (Oncorhynchus spp.) passing through dams and reservoirs on the Snake River. Actively migrating smolts were collected near the head of Lower Granite Reservoir and at Lower Granite Dam, tagged with passive integrated transponder (PIT) tags, and released to continue their downstream migration. Individual smolts were subsequently detected at PIT-tag detection facilities at Lower Granite, Little Goose, Lower Monumental, McNary, John Day and Bonneville Dams. Survival estimates were calculated using the Single-Release (SR) and Paired-Release (PR) Models. Timing of releases of tagged hatchery steelhead (O. mykiss) from the head of Lower Granite Reservoir and yearling chinook salmon (O. tshawytscha) from Lower Granite Dam in 1996 spanned the major portion of their juvenile migrations. Specific research objectives in 1996 were to (1) estimate reach and project survival in the Snake River using the Single-Release and Paired-Release Models throughout the yearling chinook salmon and steelhead migrations, (2) evaluate the performance of the survival-estimation models under prevailing operational and environmental conditions in the Snake River, and (3) synthesize results from the 4 years of the study to investigate relationships between survival probabilities, travel times, and environmental factors such as flow levels and water temperature

  12. Survival Estimates for the Passage of Juvenile Salmonids through Snake River Dams and Reservoirs, 1996 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Steven G.

    1998-02-01

    In 1996, the National Marine Fisheries Service and the University of Washington completed the fourth year of a multi-year study to estimate survival of juvenile salmonids (Oncorhynchus spp.) passing through dams and reservoirs on the Snake River. Actively migrating smolts were collected near the head of Lower Granite Reservoir and at Lower Granite Dam, tagged with passive integrated transponder (PIT) tags, and released to continue their downstream migration. Individual smolts were subsequently detected at PIT-tag detection facilities at Lower Granite, Little Goose, Lower Monumental, McNary, John Day and Bonneville Dams. Survival estimates were calculated using the Single-Release (SR) and Paired-Release (PR) Models. Timing of releases of tagged hatchery steelhead (O. mykiss) from the head of Lower Granite Reservoir and yearling chinook salmon (O. tshawytscha) from Lower Granite Dam in 1996 spanned the major portion of their juvenile migrations. Specific research objectives in 1996 were to (1) estimate reach and project survival in the Snake River using the Single-Release and Paired-Release Models throughout the yearling chinook salmon and steelhead migrations, (2) evaluate the performance of the survival-estimation models under prevailing operational and environmental conditions in the Snake River, and (3) synthesize results from the 4 years of the study to investigate relationships between survival probabilities, travel times, and environmental factors such as flow levels and water temperature.

  13. Homocystein og livsstil. Resultater fra Homocysteinundersøkelsen i Hordaland 1992-1993

    Directory of Open Access Journals (Sweden)

    Ottar Nygård

    2009-10-01

    Full Text Available  SAMMENDRAGTotal homocystein (tHcy er etablert som risikofaktor for hjerte- og karsykdom. Vi har studert determinanterav plasma tHcy i et utvalg av den voksne norske befolkning basert på undersøkelse utført av Statenshelseundersøkelser i samarbeid med Universitetet i Bergen i 1992-1993. Data ble innhentet ved kliniskundersøkelse, utfylling av tre spørreskjema og ved blodtester. I alt 18 043 personer i alderen 40-67 år møttetil undersøkelse og fikk målt plasma tHcy. Plasma folat, plasma kobalamin og 677C →T mutasjonen i genetfor metylentetrahydrofolatreduktase (MTHFR er bestemt i et underutvalg på 329 personer og på personermed svært høye tHcy verdier ( ≥ 40 μmol/L. Resultatene fra Homocysteinundersøkelsen i Hordaland harvist at kjønn, alder, folatinntak, røykevaner og kaffeforbruk er de sterkeste determinanter for plasma tHcynivå, mens kobalamininntak, fysisk aktivitet, blodtrykk og kolesterolnivå er mindre sterke determinanter.Bruk av multivitaminer eller B-vitaminer er forbundet med spesielt lave tHcy nivåer. Personer med tHcy ≥40 μmol/L er karakterisert ved høy forekomst (73% av homozygositet for 677C →T mutasjonen i MTHFRgenet og lavt folatnivå. Vi konkluderer derfor med at livsstil og etablerte risikofaktorer for hjerte- ogkarsykdom er vesentlige for nivået av plasma tHcy i den generelle voksne norske befolkning.Nygård O, Refsum H, Ueland PM, Tverdal A, Vollset SE. Homocysteine and lifestyle. The HordalandHomocysteine Study. Nor J Epidemiol 1997; 7 (2: 221-224.ENGLISH SUMMARYTotal homocysteine (tHcy concentration is an established cardiovascular risk factor. We have studieddeterminants of plasma tHcy among 18 043 subjects aged 40-67 years from Hordaland county in WesternNorway who participated in a health screening programme in 1992-1993. Gender, age, folate intake,smoking habits and coffee consumption are the strongest determinants of plasma tHcy level, whereascobalamin intake, physical activity

  14. First recorded outbreak of yellow fever in Kenya, 1992-1993. II. Entomologic investigations.

    Science.gov (United States)

    Reiter, P; Cordellier, R; Ouma, J O; Cropp, C B; Savage, H M; Sanders, E J; Marfin, A A; Tukei, P M; Agata, N N; Gitau, L G; Rapuoda, B A; Gubler, D J

    1998-10-01

    The first recorded outbreak of yellow fever in Kenya occurred from mid-1992 through March 1993 in the south Kerio Valley, Rift Valley Province. We conducted entomologic studies in February-March 1993 to identify the likely vectors and determine the potential for transmission in the surrounding rural and urban areas. Mosquitoes were collected by landing capture and processed for virus isolation. Container surveys were conducted around human habitation. Transmission was mainly in woodland of varying density, at altitudes of 1,300-1,800 m. The abundance of Aedes africanus in this biotope, and two isolations of virus from pools of this species, suggest that it was the principal vector in the main period of the outbreak. A third isolate was made from a pool of Ae. keniensis, a little-known species that was collected in the same biotope. Other known yellow fever vectors that were collected in the arid parts of the valley may have been involved at an earlier stage of the epidemic. Vervet monkeys and baboons were present in the outbreak area. Peridomestic mosquito species were absent but abundant at urban sites outside the outbreak area. The entomologic and epidemiologic evidence indicate that this was a sylvatic outbreak in which human cases were directly linked to the epizootic and were independent of other human cases. The region of the Kerio Valley is probably subject to recurrent wandering epizootics of yellow fever, although previous episodes of scattered human infection have gone unrecorded. The risk that the disease could emerge as an urban problem in Kenya should not be ignored.

  15. Army Corps of Engineers: Actions Needed to Improve Cost Sharing for Dam Safety Repairs

    Science.gov (United States)

    2015-12-01

    agreements with the Corps, their history of being a sponsor, the financial impacts of cost sharing for dam safety repair projects, and the Corps...1240 (2007)) and Beaver Lake dam, AR (Pub. L. No. 102-377, 106 Stat. 1315, 1318 (1992), Pub. L. No. 102-580, § 209(f), 106 Stat. 4797, 4830 (1992...inaction in setting a clear policy for a provision under which sponsors face significant financial impacts has contributed to conditions under

  16. Quarterly coal report, April--June 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-26

    In the second quarter of 1993, the United States produced 235 million short tons of coal. This brought the total for the first half of 1993 to 477 million short tons, a decrease of 4 percent (21 million short tons) from the amount produced during the first half of 1992. The decrease was due to a 26-million-short-ton decline in production east of the Mississippi River, which was partially offset by a 5-million-short-ton increase in coal production west of the Mississippi River. Compared with the first 6 months of 1992, all States east of the Mississippi River had lower coal production levels, led by West Virginia and Illinois, which produced 9 million short tons and 7 million short tons less coal, respectively. The principal reasons for the drop in coal output for the first 6 months of 1993 compared to a year earlier were: a decrease in demand for US coal in foreign markets, particularly the steam coal markets; a draw-down of electric utility coal stocks to meet the increase in demand for coal-fired electricity generation; and a lower producer/distributor stock build-up. Distribution of US coal in the first half of 1993 was 15 million short tons lower than in the first half of 1992, with 13 million short tons less distributed to overseas markets and 2 million short tons less distributed to domestic markets.

  17. Quarterly coal report, January--March 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-20

    The United States produced 242 million short tons of coal in the first quarter of 1993, a decrease of 6 percent (14 million short tons) from the amount produced during the first quarter of 1992. The decrease was due to a decline in production east of the Mississippi River. All major coal-producing States in this region had lower coal production levels led by West Virginia, which produced 5 million short tons less coal. The principal reasons for the overall drop in coal output compared to a year earlier were: A decrease in demand for US coal in foreign markets; a slower rate of producer/distributor stock build-up; and a drawn-down of electric utility coal stocks. Distribution of US coal in the first quarter of 1993 was 10 million short tons lower than in the first quarter of 1992, with 5 million short tons less distributed to both electric utilities and overseas markets. The average price of coal delivered to electric utilities during the first quarter of 1993 was $28.65 per short ton, the lowest value since the first quarter of 1980. Coal consumption in the first quarter of 1993 was 230 million short tons, 4 percent higher than in the first quarter of 1992, due primarily to a 5-percent increase in consumption at electric utility plants. Total consumer stocks, at 153 million short tons, and electric utility stocks, at 144 million short tons, were at their lowest quarterly level since the end of 1989. US. coal exports totaled 19 million short tons, 6 million short tons less than in the first quarter of 1992, and the lowest quarterly level since 1988. The decline was primarily due to a 1-million-short-ton drop in exports to each of the following destinations: Italy, France, Belgium and Luxembourg, and Canada.

  18. Quarterly coal report, January--March 1993

    International Nuclear Information System (INIS)

    1993-01-01

    The United States produced 242 million short tons of coal in the first quarter of 1993, a decrease of 6 percent (14 million short tons) from the amount produced during the first quarter of 1992. The decrease was due to a decline in production east of the Mississippi River. All major coal-producing States in this region had lower coal production levels led by West Virginia, which produced 5 million short tons less coal. The principal reasons for the overall drop in coal output compared to a year earlier were: A decrease in demand for US coal in foreign markets; a slower rate of producer/distributor stock build-up; and a drawn-down of electric utility coal stocks. Distribution of US coal in the first quarter of 1993 was 10 million short tons lower than in the first quarter of 1992, with 5 million short tons less distributed to both electric utilities and overseas markets. The average price of coal delivered to electric utilities during the first quarter of 1993 was $28.65 per short ton, the lowest value since the first quarter of 1980. Coal consumption in the first quarter of 1993 was 230 million short tons, 4 percent higher than in the first quarter of 1992, due primarily to a 5-percent increase in consumption at electric utility plants. Total consumer stocks, at 153 million short tons, and electric utility stocks, at 144 million short tons, were at their lowest quarterly level since the end of 1989. US. coal exports totaled 19 million short tons, 6 million short tons less than in the first quarter of 1992, and the lowest quarterly level since 1988. The decline was primarily due to a 1-million-short-ton drop in exports to each of the following destinations: Italy, France, Belgium and Luxembourg, and Canada

  19. Report and accounts 1992-1993

    International Nuclear Information System (INIS)

    1993-01-01

    Nuclear Electric's report and accounts for 1992-3 show that the electricity it supplied went up by 14%, sales were up by 22%, operating profit was up by 37%, productivity was up by 23% and operating cost was down by 11% compared with the previous year. Following the Chairman's statement, the Chief Executive's report summarises the year under the headings: electricity sales, operations, suppliers, construction, decommissioning, safety, environment, staff training and development, public relations, international relations and the future. Nuclear Electric's performance is summarised in key areas of its activities since its formation. The report concludes with the Director's report and the accounts. (UK)

  20. Load forecast: Hydro plants, 1993/94 to 2012/13, diesel plants, 1993/94 to 2002/03, customer count forecast, 1993/94 to 2002/03

    International Nuclear Information System (INIS)

    1993-06-01

    Total power sales of the Northwest Territories Power Corporation in 1992/93 were 425,183 MWh, a 1.2% decrease from 1991/92. Total generation was 471,919 MWh of which 232,504 was hydroelectric, 239,414 was diesel, and the rest was purchased. Combined system peak demands were 90,271 kW, a 2.3% increase over 1991/92. Overall sales are expected to increase 4.6% in 1993/94 and 1.9% in 1994/95. Total generation is expected to increase 3.4% in 1993/94 and combined system peak demands are expected to increase 2.8% in 1993/94 and 1.4% in 1994/95. Decreases in sales were noted on the Snare/Yellowknife and Taltston/Pine Point systems due to a labor action at the Giant Mine and lower sales to Northland Utilities. Sales on the Snare/Yellowknife system are expected to increase 4.8% as mining operations resume. A slow growth in diesel power sales was attributed partly to a mild winter. The average number of customers in 1992/93 was 14,866, of which 11,201 were domestic, 3,626 were commercial, 36 wholesale, and 3 industrial. For 1993/94, the projected customer count is 15,349. 99 tabs

  1. Experimental heavy ion physics at high energies. Progress report, September 1992--November 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    This report summarizes the research activities of the experimental high energy heavy ion physics group at Vanderbilt University carried out under Grant No. DE-FG05092ER40712 with the Department of Energy during the period Oct 1, 1992 to Nov 30, 1993. This research encompasses four areas of related inquiry in relativistic and high energy nuclear reactions. The preparation of the PHENIX experiment which has been approved as one of the two major experiments at RHIC to start in 1998. The RD10/RD45 Muon Identifier experiment which will provide essential input for the design of the Muon Endcap arm detector sub-system in PHENIX. The E855 Soft Photon Experiment at the AGS designed to clarify the status of a possible quark-gluon-plasma signature with presently available heavy-ion collisions. The construction CsI Ball detector project at Texas A&M which is designed as part of a comprehensive detector system which will probe the nuclear equation of state in the 50 MeV/nucleon domain.

  2. Manitoba oil activity review, 1993

    International Nuclear Information System (INIS)

    1994-07-01

    In an annual survey of Manitoba's petroleum industry, data are presented on oil and natural gas leases and sales, geophysical activity, exploration and drilling activity, production, oil prices and sales value, royalties and taxes, direct revenues from oil exploration and development, reserves, industry expenditures, and oil fields. Throughout the report, explanations are given of the items covered. Descriptions are made of new developments, the oil market, oil policies, incentive programs, and industrial activities. During 1993, 87 wells were drilled, compared to 28 in 1992. Oil production was down ca 3% from 1992 levels, to 634,561 m 3 ; the value of the oil produced decreased 10% to ca $77.5 million; and provincial revenues from the oil industry decreased by 4%. Oil industry expenditures in the province were estimated at $73 million, up 26% from 1992. As of 4 January 1994, there were 11 oil fields and 120 non-confidential oil pools designated in Manitoba. Crude oil prices fluctuated throughout the year, between $15.12 and $21.50/bbl. In 1993, Manitoba's average crude oil price was $19.40/bbl, compared with 1992's average of $20.89/bbl. Manitoba Energy and Mines amended the Drilling Incentive Program to provide a 10,000 m 3 holiday volume for horizontal wells. 12 figs., 17 tabs

  3. Current meter components and other data from FIXED PLATFORMS in support of the Physical Oceanography Field Program Offshore North Carolina from 1992-02-22 to 1993-02-18 (NODC Accession 9300089)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Current meter components data were collected from FIXED PLATFORMS from 22 February 1992 to 18 February 1993. Data were collected by the Science Applications, Inc....

  4. Individual reports : Finland : 1992-1998

    Index Scriptorium Estoniae

    1999-01-01

    EMKÜ presidendi Avo Kartuli külaskäigust Soome raamatukogudesse 1992. aastal ja Eesti Rahvusraamatukogu Kunstide Teabekeskuse töötajate Aurika Gergelezhiu ja Linda Tõnissoni külaskäigust vastavalt 1993. ja 1998. aastal

  5. Solid State Sciences Committee (SSSC). Technical progress report, May 1, 1992--April 30, 1993

    International Nuclear Information System (INIS)

    Taylor, R.

    1995-01-01

    The Solid State Sciences Committee (SSSC) of the National Research Council (NRC) is charged with monitoring the health of the field of materials science in the United States. Accordingly, the Committee identifies and examines both broad and specific issues affecting the field. Regular meetings, teleconferences, briefings from agencies and the scientific community, the formation of study panels to prepare reports, and special forums are among the mechanisms used by the SSSC to meet its charge. This progress report presents a review of SSSC activities from May 1, 1992 through April 30, 1993. The details of prior activities are discussed in earlier reports. During the above period, the SSSC has continued to track and participate, when requested, in the development of a Federal initiative on advanced materials and processing. Specifically, the SSSC is presently planning the 1993 SSSC Forum (to be cosponsored with the National Materials Advisory Board (NMAB) and the Washington Materials Forum (WMF)). The thrust will be to highlight the Federal Advanced Materials and Processing Program (AMPP). In keeping with its charge to identify and highlight specific areas for scientific and technological opportunities, the SSSC continued to oversee the conduct of a study on biomolecular materials. Preliminary plans also were developed for a study on neutron science, however, further activity is pending. A proposed study on ultrasmall devices has been expanded and absorbed into a broader context; the BPA, with SSSC participation, is preparing to hold a program initiation meeting to evaluate the need for a study on information technology and hardware

  6. Report on the Biological Monitoring Program at Paducah Gaseous Diffusion Plant December 1992--December 1993

    Energy Technology Data Exchange (ETDEWEB)

    Kszos, L.A.; Hinzman, R.L.; Peterson, M.J.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.

    1995-06-01

    On September 24, 1987, the Commonwealth of Kentucky Natural Resources and Environmental Protection Cabinet issued an Agreed Order that required the development of a Biological Monitoring Program (BMP) for the Paducah Gaseous Diffusion Plant (PGDP). The goals of BMP are to demonstrate that the effluent limitations established for PGDP protect and maintain the use of Little Bayou and Big Bayou creeks for growth and propagation of fish and other aquatic life, characterize potential health and environmental impacts, document the effects of pollution abatement facilities on stream biota, and recommend any program improvements that would increase effluent treatability. The BMP for PGDP consists of three major tasks: effluent and ambient toxicity monitoring, bioaccumulation studies, and ecological surveys of stream communities (i.e., benthic macroinvertebrates and fish). This report includes ESD activities occurring from December 1992 to December 1993, although activities conducted outside this time period are included as appropriate.

  7. Peace/Williston fish and wildlife compensation program: 1992-1993 public compensation report

    International Nuclear Information System (INIS)

    Bemister, C.N.

    1993-01-01

    The Peace/Williston Fish and Wildlife Compensation Program is a joint initiative by British Columbia Hydro and the provincial environment ministry to enhance and protect fish and wildlife resources and their habitat in the Williston watershed affected by the construction of the WAC Bennett and Peace Canyon dams on the Peace River. The interest from a fund of $11 million, established by BC Hydro in 1988, is used to maintain the compensation programs. Public input to the ongoing fish and wildlife programs is provided by a public consultation program. To date, the Peace/Williston compensation program has undertaken 93 projects to either conserve or enhance fish and wildlife through habitat improvement and protection. A summary is presented of the activities undertaken by the public consultation program in 1992/93 and public attitudes toward the consultation program. Activities undertaken in the fish and wildlife enhancement program are summarized in appendices. Fisheries programs included stocking, stream fertilization, small lake surveys, preparation of a side channel in Carbon Creek for multi-species spawning, and creation of an artificial spring at Windy Point for spawning purposes. Wildlife programs included channel clearance and vegetation supply improvements to enhance muskrat and beaver habitat; radio monitoring of sheep and elk; studying the feasibility of transplanting elk herds; and purchase of critical ungulate winter habitat lands. 13 figs., 4 tabs

  8. Report on the coal liquefaction committee in fiscal 1992; 1992 nendo sekitan ekika iinkai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-01

    This paper reports the activities of the coal liquefaction committee in fiscal 1992. The first committee meeting was held on August 21. After having confirmed the minutes of the previous meeting, an explanation was given on the research and development plans in fiscal 1992. The explanation covered the general explanation, bituminous coal liquefaction, brown coal liquefaction, and the common and fundamental aspects. The presented topics included the achievements in the operations using a bituminous coal liquefaction PSU and a small device, the status of compiling the achievements in the brown coal liquefaction project, preparation of the basic policy on developing the common basic technologies, and structuring of a coal liquefaction technology package. The second meeting was held on March 18, 1993. The meeting verified the minutes of the previous meeting, and gave the sub-committee reports for fiscal 1992. The sub-committees include those for bituminous coal liquefaction, brown coal liquefaction, environmental safety evaluation, and separation and refining technologies. As the summary of the achievements in fiscal 1992, descriptions were given on the bituminous coal liquefaction, brown coal liquefaction, and common and basic aspects. The fiscal 1993 plan presented included the budget aspect. A description was given as a topic on the economic performance evaluation and the working scheme (the execution plan) for the brown coal liquefaction process. (NEDO)

  9. Alternatives to traditional transportation fuels 1993

    Energy Technology Data Exchange (ETDEWEB)

    1995-01-01

    In recent years, gasoline and diesel fuel have accounted for about 80 percent of total transportation fuel and nearly all of the fuel used in on-road vehicles. Growing concerns about the environmental effects of fossil fuel use and the Nation`s high level of dependence on foreign oil are providing impetus for the development of replacements or alternatives for these traditional transportation fuels. (The Energy Policy Act of 1992 definitions of {open_quotes}replacement{close_quotes} and {open_quotes}alternative{close_quotes} fuels are presented in the following box.) The Alternative Motor Fuels Act of 1988, the Clean Air Act Amendments of 1990 (CAAA90) and the Energy Policy Act of 1992 (EPACT) are significant legislative forces behind the growth of replacement fuel use. Alternatives to Traditional Transportation Fuels 1993 provides the number of on-road alternative fueled vehicles in use in the United States, alternative and replacement fuel consumption, and information on greenhouse gas emissions resulting from the production, delivery, and use of replacement fuels for 1992, 1993, and 1995.

  10. Hanford Site Permanent Isolation Surface Barrier Development Program: Fiscal year 1992 and 1993 highlights

    International Nuclear Information System (INIS)

    Cadwell, L.L.; Link, S.O.; Gee, G.W.

    1993-09-01

    The Hanford Site Permanent Isolation Surface Barrier Development Program was jointly developed by the Pacific Northwest Laboratory and Westinghouse Hanford Company to design and test an earthen cover system that can be used to inhibit water infiltration; plant, animal, and human intrusion; and wind and water erosion. Kaiser Engineers Hanford Company provided engineering design support for the program. Work on barrier design has been under way at Hanford for nearly 10 years. The comprehensive development of a long-term barrier, formerly the Hanford Site Protective Barrier Development Program, was initiated in FY 1986, and a general field-tested design is expected to be completed by FY 1998. Highlights of efforts in FY 1992 and FY 1993 included the resumption of field testing, the completion of the prototype barrier design, and the convening of an external peer review panel, which met twice with the barrier development team. The review panel provided helpful guidance on current and future barrier development activities, while commending the program for its significant technical contributions to innovative barrier technology development

  11. AGS experiments: 1992, 1993, 1994. Revision December 1994

    International Nuclear Information System (INIS)

    Depken, J.C.

    1995-03-01

    This document contains listings and two page summaries for experiments run at the GAS for 1992--1994. Listings are also given for publications and experimenters. A working copy of the 1995--1996 experiment schedule is also included

  12. FY 1993 task plans for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Shipler, D.B.

    1991-10-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to individuals and populations. The primary objective of work to be performed in FY 1993 is to complete the source term estimates and dose estimates for key radionuclides for the air and river pathways. At the end of FY 1993, the capability will be in place to estimate doses for individuals in the extended (32-county) study area, 1944--1991. Native American research will continue to provide input for tribal dose estimates. In FY 1993, the Technical Steering Panel (TSP) will decide whether demographic and river pathways data collection should be extended beyond FY 1993 levels. The FY 1993 work scopes and milestones in this document are based on the work plan discussed at the TSP Budget/Fiscal Subcommittee meeting on August 19--20, 1991. Table 1 shows the FY 1993 milestones; Table 2 shows estimated costs. The subsequent work scope descriptions are based on the milestones. This document and the FY 1992 task plans will form the basis for a contract with Battelle and the Centers for Disease Control (CDC). The 2-year dose reconstruction contract is expected to begin in February 1992. This contract will replace the current arrangement, whereby the US Department of Energy directly funds the Pacific Northwest Laboratory to conduct dose reconstruction work. In late FY 1992, the FY 1993 task plans will be more fully developed with detailed technical approaches, data quality objectives, and budgeted labor hours. The task plans will be updated again in July 1993 to reflect any scope, milestone, or cost changes directed during the year by the TSP. 2 tabs

  13. Annual report of Naka Fusion Research Establishment for the period from April 1, 1992 to March 31, 1993

    International Nuclear Information System (INIS)

    Ohta, Mitsuru; Shimizu, Katsuhiro; Fujii, Tuneyuki; Nishi, Masataka; Matoba, Tohru; Kanazawa, Tetsuo

    1993-10-01

    Research and development activities at Naka Fusion Research Establishment, JAERI, are reported for the period from April 1, 1992 to March 31, 1993. The main objectives of JT-60U experiments in FY1992 were to improve plasma confinement properties and to study non-inductive current drive. High-βp H-mode performance obtained in March 1993 was highlighted, in particular, a world-record fusion-triple-product of 1.1 x 10 21 m -3 · s · keV, and record values for JT-60 of neutron yield rate of 5.6 x 10 16 s -1 , stored energy of 8.3 MJ, and H-factor of 3.6. The JFT-2M continued to study divertor biasing and ergodic limiter experiments, and disruption control by ECH. The study in Plasma Theory and Computation focused on scaling laws of the thermal energy confinement and the bootstrap current, the iron temperature gradient instability, the MHD stability, the rotation damping by external magnetic error field, and the burning plasma of D- 3 He fusion. As for the fusion engineering research, the vacuum technology advanced the development of a high resolution quadrupole mass spectrometer, etc. The super-conducting Demo Poloidal Coil achieved pulsed operation with 7 T in 0.5 s, and newly developed conductors made of Nb 3 Al and Nb 3 Sn showed 40 kA at 12 T and 82 kA at 13.6 T, respectively. A high energy H - beam of 350 kV, 0.17 A was produced with a current density of 10 mA/cm 2 . Much effort was made in developing the ECH gyrotron with an output power of 460 kW at 120 GHz for 100 ms. The main progress in the Tritium Systems Test Assembly (a US/Japan collaboration) was continuous loop run for 25 days. The developed plasma facing components posed no problem under a heat flux of 20 MW/m 2 for 30 s over 1000 thermal cycles. (J.P.N.)

  14. Lake Roosevelt Fisheries Monitoring Program. 1993 Annual report

    International Nuclear Information System (INIS)

    Underwood, K.; Shields, J.

    1996-06-01

    The first three years of this study were used to collect pre-hatchery baseline data on the fishery. The Spokane Tribal Hatchery began stocking kokanee and rainbow trout in 1991 and Sherman Creek Hatchery began stocking by 1992. The estimated number of kokanee (13,986) harvested in 1993 was similar to harvest numbers in the previous years, but the number of rainbow trout (403,277) and walleye (337,413) harvested doubled from estimates made in past years. The stocking of yearling kokanee began in1992, totaling approximately 140,000 yearlings. The yearlings were not expected to begin entering the creel until 1993 with the main harvest in 1994. As a result, it was too early to speculate on the effect of stocking yearlings instead of fry on the creel. The 1993 rainbow trout harvest escalated. The increased number of walleye harvested was believed to be from the increased angler pressure. Kokanee salmon and rainbow trout growth appeared to be similar to previous years. The growth of walleye was less than in year past, but the average size of walleye in the creel increased. The feeding habits of kokanee, rainbow trout and walleye in 1993 were similar to previous years

  15. Preliminary survey of separations technology applicable to the pretreatment of Hanford tank waste (1992--1993)

    International Nuclear Information System (INIS)

    Lawrence, W.E.; Kurath, D.E.

    1994-04-01

    The US Department of Energy has established the Tank Waste Remediation System (TWRS) to manage and dispose of radioactive wastes stored at the Hanford Site. Within this program are evaluations of pretreatment system alternatives through literature reviews. The information in this report was collected as part of this project at Pacific Northwest Laboratory. A preliminary survey of literature on separations recently entered into the Hanford electronic databases (1992--1993) that have the potential for pretreatment of Hanford tank waste was conducted. Separation processes that can assist in the removal of actinides (uranium, plutonium, americium), lanthanides, barium, 137 Cs, 90 Sr, 129 I, 63 Ni, and 99 Tc were evaluated. Separation processes of interest were identified through literature searches, journal reviews, and participation in separation technology conferences. This report contains brief descriptions of the potential separation processes, the extent and/or selectivity of the separation, the experimental conditions, and observations. Information was collected on both national and international separation studies to provide a global perspective on recent research efforts

  16. Annual Report 1992-1993

    International Nuclear Information System (INIS)

    1993-01-01

    This report covers the first year of operation of the Nuclear Safety Bureau (NSB) as a statutory body, established by amended legislation in 1992, independent of the Australian Nuclear Science and Technology Organisation (ANSTO). The amended legislation gives the NSB responsibility for monitoring and reviewing the safe operation of ANSTO's nuclear plant and provides the power to impose restrictions and conditions on operations. The amended legislation, together with directions made by the Minister, required the NSB to seek a more prominent role in providing advice on nuclear safety and other regulatory issues as part of Australia's policy for the programs of the International Atomic Energy Agency (IAEA) and the OECD Nuclear Energy Agency (NEA). In particular, the NSB undertook new tasks associated with the regulation of the safe transport of radioactive substances and provided two submissions to the Research Reactor Review established by the Minister to investigate a possible replacement for the HIFAR research reactor. In addition to the monitoring carried out by the NSB, reviews and audits were carried out within ANSTO by a Reactors Safety Committee and a Nuclear Safety Unit. ANSTO complied with a number of NSB requirements including plant modifications and documentation upgrades for HIFAR, and an NSB condition associated with maintenance of shutdown devices, before re-starting the Moata reactor. The NSB concludes that following a review of the issues reported, the safety of operation of ANSTO's nuclear plant was satisfactory during the year. 1 tab. 2 figs

  17. 1992 Fernald Site Environmental Report

    International Nuclear Information System (INIS)

    1993-06-01

    The Fernald site is a Department of Energy (DOE) owned facility that produced high-quality uranium metals for military defense for nearly 40 years. DOE suspended production at the Fernald site in 1989 and formally ended production in 1991. Although production activities have ceased, the site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This report covers the reporting period from January 1, 1992, through December 31, 1992, with the exception of Chapter Three, which provides information from the first quarter of 1993 as well as calendar year 1992 information. This 1992 report provides the general public as well as scientists and engineers with the results from the site's ongoing Environmental Monitoring Program. Use included in this report are summary data of the sampling conducted to determine if the site complies with DOE, US Environmental Protection Agency (USEPA), and Ohio EPA (OEPA) requirements. Finally, this report provides general information on the major waste management and environmental restoration activities during 1992

  18. Exports of propane and butanes, January-December 1993

    International Nuclear Information System (INIS)

    1994-05-01

    Tables are presented showing exports of propane and butane for each month of 1993. Comparisons with the same month in 1992 are included, as well as a running total. Export quantities are given in m 3 by region within Canada and for Canada as a whole, and as m 3 /d for Canada as a whole. Average export prices in Canadian cents per liter for the same seven regions and Canada as a whole are also given. Exports show a seasonal trend, with a low of 8,681 m 3 /d in May and a high of 18,565 m 3 in December for propane. Butane exports also show a seasonal trend with a low of 1,806 m 3 /d in June and a high of 9,306 m 3 /d in January. Propane prices ranged from 9.68 cents/l in December to 12.47 cents/l in February, compared to a range of 7.55 to 10.71 cents/l in 1992. Butane prices ranged from 9.22 cents/l in November to 12.38 cents/l in June, compared to a range of 10 to 12.78 cents/l in 1992. Total propane exports in 1993 were 4,761,795 m 3 (6.8% higher than in 1992) and total butane exports were 1,974,682 m 3 (13% lower than in 1992). 24 tabs

  19. National dam inventory provides data for analysis

    International Nuclear Information System (INIS)

    Spragens, L.

    1992-01-01

    The Association of State Dam Safety Officials completed a dam inventory this fall. Information on approximately 90,000 state-regulated dams in the US collected during the four-year inventory is being used to build a database managed by the Federal Emergency Management Agency. In addition to ASDSO's work, the federal government conducted an inventory of federal dams. This data will be added to the state information to form one national database. The database will feature 35 data fields for each entry, including the name of the dam, its size, the name of the nearest downstream community, maximum discharge and storage volume, the date of the last inspection, and details about the emergency action plan. The program is an update of the nation's first dam inventory, required by the Dam Safety Act of 1972. The US Army Corps of Engineers completed the original inventory in 1981. The Water Resources Development Act of 1986 authorized appropriations of $2.5 million for the Corps to update the inventory. FEMA and the Corps entered into an agreement for FEMA to undertake the task for the Corps and to coordinate work on both the federal and state inventories. ASDSO compiles existing information on state-regulated dams into a common format for the database, added missing information, and established a process for continually updating data. ASDSO plans to analyze the information collected for the database. It will look at statistics for the number of dams regulated, communities that could be affected, and the number of high-hazard dams. FEMA is preparing reports for Congress on the project. The reports, which are expected to be ready by May 1993, will include information on the methodology used and facts about regulated dams under state jurisdiction

  20. Temperature, salinity and other variables collected from discrete sample and profile observations using CTD, bottle and other instruments from DISCOVERY in the South Atlantic Ocean from 1992-12-22 to 1993-02-01 (NCEI Accession 0144287)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0144287 includes discrete sample and profile data collected from DISCOVERY in the South Atlantic Ocean from 1992-12-22 to 1993-02-01. These data...

  1. Fiscal 1993 U.S. Science Budget request released

    Science.gov (United States)

    Bush, Susan; Simarski, Lynn Teo; DeVito, M. Catherine

    1992-02-01

    DOE's proposed budget for fiscal 1993 is $19.4 billion, almost level with fiscal 1992's $19 billion. Of that, $5.5 billion is targeted for environmental cleanup at DOE facilities, an increase of $1.16 billion. DOE's portion of research and development related to the National Energy Strategy is $725 million, up 16% from 1992. Funding for defense activities is down 9% to $7.5 billion from $8.3 billion.According to DOE Secretary James D. Watkins, “Congressional enactment of a comprehensive and balanced legislative package is needed to implement fully the president's National Energy Strategy.” As such, there are provisions in the fiscal 1993 DOE budget for advanced energy technology R&D to reduce energy consumption, increase fuel flexibility, and improve U.S. competitiveness in world markets.

  2. The big issue: environment and large dams

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, Peter [Harvard Univ. (United States)

    1999-09-01

    Some of the environmental issues associated with large dams are discussed. Prior to commencement of construction of the Three Gorges dam in China in 1993, 50 years of planning and 20 years of environmental argument had taken place. The Chinese were conscious of the need to consider the environmental issues as a factor in attracting foreign investment for the world's biggest and most expensive dam. While the resettlement issues (1.2 M people were resettled) have dominated the current arguments, the other important issues are environment, economics and safety. Despite criticism from environmentalists, both at home and abroad, the Chinese went ahead with the project. With regard to resettlement, the Chinese appear to be much more considerate than some other countries in providing housing and agricultural land. Perhaps the main losses were suffered by cultural heritage sites and aquatic systems, rather than by the resettled population. (UK)

  3. The big issue: environment and large dams

    International Nuclear Information System (INIS)

    Rogers, Peter

    1999-01-01

    Some of the environmental issues associated with large dams are discussed. Prior to commencement of construction of the Three Gorges dam in China in 1993, 50 years of planning and 20 years of environmental argument had taken place. The Chinese were conscious of the need to consider the environmental issues as a factor in attracting foreign investment for the world's biggest and most expensive dam. While the resettlement issues (1.2 M people were resettled) have dominated the current arguments, the other important issues are environment, economics and safety. Despite criticism from environmentalists, both at home and abroad, the Chinese went ahead with the project. With regard to resettlement, the Chinese appear to be much more considerate than some other countries in providing housing and agricultural land. Perhaps the main losses were suffered by cultural heritage sites and aquatic systems, rather than by the resettled population. (UK)

  4. Alberta Petroleum Marketing Commission annual report, 1993

    International Nuclear Information System (INIS)

    1994-05-01

    The Alberta Petroleum Marketing Commission has the responsibility of selling the Crown's royalty share of Alberta's crude and synthetic oil production; similar services are provided for natural gas. The Commission also markets crude oil on behalf of producers to North American and offshore consumers. The Commission's position as the largest crude oil marketer in Canada enables it to provide analyses of industry pricing and marketing trends to the Alberta government. 1993 marked the last full year of the Commission operating as Alberta's representative in the energy regulatory arena in Canada and the USA; due to restructuring, these functions will be transferred to the Ministry of Energy in early 1994. A brief overview is presented of crude oil markets in Canada and the USA. The Commission's receipts of light and medium royalty oil totalled 40.2 million bbl, down 11% from 1992, and receipts of heavy crude were 3.7 million bbl, down 42% from 1992. Revenue from crude oil sales was $800 million, down 25% from 1992. The Commission's natural gas activities in 1993 included price determination and information collection. 4 figs., 3 tabs

  5. Immunization in India 1993-1999: wealth, gender, and regional inequalities revisited.

    Science.gov (United States)

    Gaudin, Sylvestre; Yazbeck, Abdo S

    2006-02-01

    Previously published evidence from the 1992-1993 Indian National Family and Health Survey (NFHS) on the state of childhood immunization showed the importance of analyzing immunization outcomes beyond national averages. Reported total system failure (no immunization for all) in some low performance areas suggested that improvements in immunization levels may come with a worsening of the distribution of immunization based on wealth. In this paper, using the second wave of the NFHS (1998-1999), we take a new snapshot of the situation and compare it to 1992-1993, focusing on heterogeneities between states, rural-urban differentials, gender differentials, and more specifically on wealth-related inequalities. To assess whether improvements in overall immunization rates (levels) were accompanied by distributional improvements, or conversely, whether inequalities were reduced at the expense of overall achievement, we use a recently developed methodology to calculate an inequality-adjusted achievement index that captures performance both in terms of efficiency (change in levels) and equity (distribution by wealth quintiles) for each of the 17 largest Indian states. Comparing 1992-1993 to 1998-1999 achievements using different degrees of "inequality aversion" provides no evidence that distributional improvements occur at the expense of overall performance.

  6. Pressurized Fluidized-Bed Hydroretorting of eastern oil shales. Final report, June 1992--January 1993

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, M.J.; Mensinger, M.C.; Erekson, E.J.; Rue, D.M.; Lau, F.S. [Institute of Gas Technology, Chicago, IL (United States); Schultz, C.W.; Hatcher, W.E. [Alabama Univ., University, AL (United States). Mineral Resources Inst.; Parekh, B.K. [Kentucky Univ., Lexington, KY (United States). Center for Applied Energy Research; Bonner, W.P. [Tennessee Technological Univ., Cookeville, TN (United States)

    1993-03-01

    The Devonian oil shales of the Eastern United States are a significant domestic energy resource. The overall objective of the multi-year program, initiated in September 1987 by the US Department of Energy was to perform the research necessary to develop the pressurized fluidized-bed hydroretorting (PFH) process for producing oil from Eastern oil shales. The program also incorporates research on technologies in areas such as raw shale preparation, beneficiation, product separation and upgrading, and waste disposal that have the potential of improving the economics and/or environmental acceptability of recovering oil from oil shales using the PFH process. The program was divided into the following active tasks: Task 3 -- Testing of Process Improvement Concepts; Task 4 -- Beneficiation Research; Task 6 -- Environmental Data and Mitigation Analyses; and Task 9 -- Information Required for the National Environmental Policy Act. In order to accomplish all of the program objectives, tho Institute of Gas Technology (ICT), the prime contractor, worked with four other institutions: The University of Alabama/Mineral Resources Institute (MRI), the University of Alabama College of Engineering (UA), University of Kentucky Center for Applied Energy Research (UK-CAER), and Tennessee Technological University (TTU). This report presents the work performed by IGT from June 1, 1992 through January 31, 1993.

  7. 77 FR 9265 - Glen Canyon Dam Adaptive Management Work Group

    Science.gov (United States)

    2012-02-16

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Glen Canyon Dam Adaptive Management Work Group... Adaptive Management Work Group (AMWG) makes recommendations to the Secretary of the Interior concerning.... L. 102-575) of 1992. The AMP includes a Federal advisory committee, the AMWG, a technical work group...

  8. Progress Report. Institute of Atomic Physics, Institute of Physics and Nuclear Engineering, Department of Heavy Ion Physics. 1992-1993

    International Nuclear Information System (INIS)

    Grama, C.; Ionescu-Bujor, M.; Poenaru, D.; Pop, A.

    1994-01-01

    A brief account of the research and development activities carried out in the Department of Heavy Ion Physics, Institute of Atomic Physics, Institute of Physics and Nuclear Engineering, Bucharest, during the period January 1992 to December 1993 is presented. The main topics concern nuclear structure models and methods, heavy-ion-induced reactions, and general properties of nuclei and nuclear energy levels. Also, works dealing with particle detection, measuring instruments and methods are reported. The report contains two sections. The first covers the research in progress in the fields of nuclear structure, nuclear reactions, atomic physics, accelerator, instrumentation, methods and computer codes. The second one, the appendix, contains the list of publications of the Department staff in journals and proceedings, books, and preprints, the conference contributions, the academic degrees awarded, the scientific exchanges, and the list of scientific personnel

  9. U.S. industry to hold 1994 spending at the 1993 level

    International Nuclear Information System (INIS)

    Beck, R.J.

    1994-01-01

    A sharp cut in spending on pipelines will hold US petroleum industry budgets at about 1993 levels for domestic projects this year. Excluding pipeline outlays, industry spending for capital and exploration items will advance. Oil and Gas Journal's annual budget survey shows US companies plan to spend $31.3 billion on US projects in 1994, down only 0.7% from 1993. Spending last year was down by the same percentage from 1992's $31.7 billion. Total outlays, excluding pipelines, well be $28.9 billion, up 5.8% from 1993. In 1993 spending excluding pipelines was $27.3 billion, down 1.2% from 1992. Industry's total spending hit a high of $83 billion in 1981. It then fell to the recent low of $25.2 billion in 1987. Adjusted for inflation, spending in 1994 will be the lowest since 1987. A sharp drop in drilling lowered upstream outlays during the past several years. At the same time, spending for upgrades, renovation, environmental compliance, marketing, and transportation bolstered downstream budgets. E and P spending in 1994 will increase 6.2% from the 1993 level, moving up to $14.8 billion. Refining capital spending will inch up 0.9% to $5.4 billion for 1994

  10. Arctic environmental strategy: Progress report, April 1992 - March 1993

    International Nuclear Information System (INIS)

    1993-01-01

    The Arctic Environmental Strategy is part of Canada's Green Plan and involves providing $100 million over six years to address environmental problems in the Canadian north in the areas of contaminants, waste, water, and environment/economy integration. In 1992/93, over 50 scientific studies on the origins, occurrence, and behavior of contaminants in the Arctic were conducted, and a series of large-volume atmospheric stations were established. Caribou herds, fish, and the health of aboriginal northern peoples are being monitored. Over 100 sites across the north were cleaned in 1992/93, including commercial fishing waste sites, oil/gas exploration staging sites, and diamond drill camps. In addition to ongoing monitoring of water quality and quantity, a number of studies are being conducted to respond to local water concerns. An environmental action program is working through schools and northern communities on issues such as recycling, water pollution avoidance, and resource conservation and management. In response to demand for access to information about the north, the Northern Information Network is being established which will link users of databases and encourage information sharing. 5 figs

  11. Hungry Horse Dam Fisheries Mitigation Implementation Plan, 1990-2003 Progress (Annual) Report.

    Energy Technology Data Exchange (ETDEWEB)

    Montana Department of Fish, Wildlife and Parks; Confederated Salish and Kootenai Tribes

    1993-03-10

    In this document the authors present mitigation implementation activities to protect and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan only addresses non-operational actions (mitigation measures that do not affect dam operation) described in the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' (Mitigation Plan) submitted to the Northwest Power Planning Council (Council) in March 1991 and in accordance with subsequent Council action on that Mitigation Plan. Operational mitigation was deferred for consideration under the Columbia Basin System Operation Review (SOR) process. This document represents an implementation plan considered and conditionally approved by the Council in March of 1993.

  12. Dam! Dam! Dam!

    International Nuclear Information System (INIS)

    McCully, P.

    1997-01-01

    The author of ''Silenced Rivers'' a book questioning the desirability of dam building and hydroelectric power generation argues the main themes of his book in this paper. Despite being hailed by politicians as good solutions to power generation problems, and enthusiastically pursued in China, the U.S.A., the former Soviet Union, India and Japan, dams have far-reaching ecological and human consequences. The ecosystems lost to flooding, and the agricultural land use lost, the human cost in terms of homes and employment lost to reservoirs, disease from water-borne infections such as malaria, and the hazards of dams overflowing or breaking are all factors which are against the case for dam construction. The author argues the hydroelectric power may be renewable, but the social, agricultural and ecological costs are too high to justify it as a method of first choice. (UK)

  13. Columbia River pathway report: phase I of the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1991-07-01

    This report summarizes the river-pathway portion of the first phase of the Hanford Environmental Dose Reconstruction (HEDR) Project. The HEDR Project is estimating radiation doses that could have been received by the public from the Department of Energy's Hanford Site, in southeastern Washington State. Phase 1 of the river-pathway dose reconstruction effort sought to determine whether dose estimates could be calculated for populations in the area from above the Hanford Site at Priest Rapids Dam to below the site at McNary Dam from January 1964 to December 1966. Of the potential sources of radionuclides from the river, fish consumption was the most important. Doses from drinking water were lower at Pasco than at Richland and lower at Kennewick than at Pasco. The median values of preliminary dose estimates calculated by HEDR are similar to independent, previously published estimates of average doses to Richland residents. Later phases of the HEDR Project will address dose estimates for periods other than 1964--1966 and for populations downstream of McNary Dam. 17 refs., 19 figs., 1 tab.

  14. Columbia River pathway report

    International Nuclear Information System (INIS)

    1991-07-01

    This report summarizes the river-pathway portion of the first phase of the Hanford Environmental Dose Reconstruction (HEDR) Project. The HEDR Project is estimating radiation doses that could have been received by the public from the Department of Energy's Hanford Site, in southeastern Washington State. Phase 1 of the river-pathway dose reconstruction effort sought to determine whether dose estimates could be calculated for populations in the area from above the Hanford Site at Priest Rapids Dam to below the site at McNary Dam from January 1964 to December 1966. Of the potential sources of radionuclides from the river, fish consumption was the most important. Doses from drinking water were lower at Pasco than at Richland and lower at Kennewick than at Pasco. The median values of preliminary dose estimates calculated by HEDR are similar to independent, previously published estimates of average doses to Richland residents. Later phases of the HEDR Project will address dose estimates for periods other than 1964--1966 and for populations downstream of McNary Dam. 17 refs., 19 figs., 1 tab

  15. Daresbury 1992/93

    International Nuclear Information System (INIS)

    1993-01-01

    An overview of the activities at Daresbury over the year 1992/3 is given. The Nuclear Structure Facility (NSF) was closed at the end of March 1993. The EUROGAM gamma-ray spectrometer was brought into operation in October 1992 and the scheduled experiments were completed before the NSF closure. The results are still being analysed by the participating groups. A detailed explanation of EUROGAM and some of the experimental results obtained are given. The Synchrotron Radiation Source has continued to provide powerful light beams for academic and and industrial users to study the physical properties of matter. A new wiggler magnet has improved its operation and research into solid catalysts sleeping sickness, the measurement of spin and orbital angular momentum, surface structure and the photodissociation and photoionization of hydrogen has been carried out. The computational science activities are described. Two new areas of research are medium energy ion scattering and the Research Unit for Surfaces, Transforms and Interfaces. (UK)

  16. Sinkhole formation mechanism at Steinaker Dam : the complete story

    Energy Technology Data Exchange (ETDEWEB)

    Dise, K. [United States Dept. of the Interior, Washington, DC (United States). Bureau of Reclamation

    2009-07-01

    This case history summary described an internal erosion event that occurred at a zoned earthfill dam located within the Ashley Creek watershed area of the Uinta Mountain uplift. The incident occurred under static loading. The rocks in the region are heavily fractured with close to moderately spaced joints along the bedding planes. The joints were not grouted during the dam's construction, and the foundation was not treated with dental concrete or slush grouting. The dam's core material consisted of a mixture of clay, silt and sand. A sinkhole area appeared on the downstream face of the dam and was filled. A second sinkhole appeared in 1965. Abutment grouting was performed. A core investigation study in 1992 showed that voids were present in the core. Deep dynamic compaction was used to densify the foundation materials. Voids in the gravel envelope were filled with fine sand. The investigation showed that the sinkholes were formed by seeps travelling through abutment bedrock fractures. The voids were large enough to provide an exit for the fine-grained foundation alluvial materials. It was concluded that grouting the abutment prevented higher velocity seepages that may have eventually initiated a dam breach. 6 figs.

  17. Detection of water leaks in the dam Joumine and study of sedimentation in the dam Ghezela by nuclear method

    International Nuclear Information System (INIS)

    Sari Souha

    2013-01-01

    The objective of this study is to determinate the paths of leaks observed in the dam Joumine and to identify the origin of salinity in the drain D2. In addition, the evaluation of the sedimentation measurement of suspended elements in the dam Ghezela is our second objective. The Joumine dam located in the North-east of Tunisia (governorate of Bizerte), was built in 1983 has an upstream watershed area of 418 km 2 . The reservoir capacity is 130 Mm 3 . This dam observed a water leakage from its implementation at the two drains D1 and D2 with a emerging flow rate reached a value close to 500 l/s, about 16 pour cent of its capacity. The injection of an insulating material in Karsts networks reduces the leakage rate to a value of 120 l / s in 1993 and 88 l / s in 2013, but this decrease was accompanied by an increase in salinity level in D2. The results from a multidisciplinary approach showed that the leakage path from the left bank of the reservoir where the leak was first detected, heading both D1 and D2 drains and the salinity in drain D2 due to the dissolution of the gypsum layer downstream of the dam and the contribution of brackish water from the left bank. The Ghezela dam located in the same area, was built in 1984 has an upstream watershed area of 48 km 2 . This dam has been an increase in sedimentation of 0.3 million m3 in 1994 to 1.7 million m 3 in 2010. In this study, the suspended elements were measured with a nuclear probe composed by a radioactive source of americium 241 and a NaI detector trained by a boat at different depth in the reservoir.

  18. Uranium purchases report 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Data reported by domestic nuclear utility companies in their responses to the 1991 through 1993 ''Uranium Industry Annual Survey,'' Form EIA-858, Schedule B,'' Uranium Marketing Activities,'' are provided in response to the requirements in the Energy Policy Act 1992. Appendix A contains an explanation of Form EIA-858 survey methodologies with emphasis on the processing of Schedule B data. Additional information published in this report not included in Uranium Purchases Report 1992, includes a new data table. Presented in Table 1 are US utility purchases of uranium and enrichment services by origin country. Also, this report contains additional purchase information covering average price and contract duration. Table 2 is an update of Table 1 and Table 3 is an update of Table 2 from the previous year's report. The report contains a glossary of terms

  19. Radiation Protection Services Division: progress report for 1992-1993

    International Nuclear Information System (INIS)

    Massand, O.P.; Murthy, B.K.S.

    1994-01-01

    This report describes the work of the Radiation Protection Services Division during 1993, for implementation of radiation safety in all institutions in India using radiation sources in medical, industrial and research applications. It gives information about personnel monitoring using photographic film and TLD badges, neutron monitoring badges, advisory and licensing services, regulation, transport of radioactive materials and periodic protection survey. About 33 publications by the staff of the Division are also listed. (author). 4 tabs

  20. Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    DeHart, Michele; Berggren, Thomas J.; Filardo, Margaret (Columbia Basin Fish and Wildlife Authority, Fish Passage Center, Portland, OR)

    2003-09-01

    The runoff volumes in 2002 were near average for the January to July period above Lower Granite Dam (80%) and The Dalles Dam (97%). The year 2002 hydrosystem operations and runoff conditions resulted in flows that were less than the seasonal Biological Opinion (Opinion) flow objectives at Lower Granite Dam for both the spring and summer period. The seasonal flow objectives for Priest Rapids and McNary dams were exceeded for the spring period, but at McNary Dam summer flow objectives were not met. While seasonal flow objectives were exceeded for the spring at McNary Dam, the 2002 season illustrated that Biological Opinion management to seasonal flow targets can result in conditions where a major portion of the juvenile fish migration migrates in conditions that are less than the flow objectives. The delay in runoff due to cool weather conditions and the inability of reservoirs to augment flows by drafting lower than the flood control elevations, resulted in flows less than the Opinion objectives until May 22, 2002. By this time approximately 73% of the yearling chinook and 56% of steelhead had already passed the project. For the most part, spill in 2002 was managed below the gas waiver limits for total dissolved gas levels and the NMFS action criteria for dissolved gas signs were not exceeded. The exception was at Lower Monumental Dam where no Biological Opinion spill occurred due to the need to conduct repairs in the stilling basin. Survival estimates obtained for PIT tagged juveniles were similar in range to those observed prior to 2001. A multi-year analysis of juvenile survival and the factors that affect it was conducted in 2002. A water transit time and flow relation was demonstrated for spring migrating chinook and steelhead of Snake River and Mid Columbia River origin. Returning numbers of adults observed at Bonneville Dam declined for spring chinook, steelhead and coho, while summer and fall chinook numbers increased. However, all numbers were far greater

  1. Cordova Lake dam hydroelectric generating station case study

    International Nuclear Information System (INIS)

    Kerr, D.; Huxley, J.

    1993-01-01

    The Ontario Ministry of Natural Resources released a Crown owned site to the private water power industry as part of the small hydro site release program initiated by the Ontario Government in the mid 1980's. The Cordova Lake Dam Hydroelectric Generating Station, built on this site, has been in operation since the first week of October, 1992. Since that time, the plant has been operating with less than 1 % down time and has generated over 2,400 MWh of electricity. Algonquin Power Systems is responsible for the management and operations of the plant which includes full time monitoring from the company's Mississauga office and a part time employee at Cordova Lake. Cordova Lake Dam is located on the Crowe River at the outlet of Cordova Lake, approximately 125 kilometers east of Toronto, Ontario. The total cost of the Cordova Lake Dam project was $1.6 million. Algonquin Power contributed 20% equity to the project. Algonquin Power was also responsible for all engineering and geotechnical work and for completing the construction and equipment contracts. 1 tab., 2 figs

  2. United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992.

  3. United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993

    International Nuclear Information System (INIS)

    1994-06-01

    The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992

  4. The Canadian oil market: Annual review for 1993

    International Nuclear Information System (INIS)

    1994-07-01

    An overview is provided of the salient features of the Canadian oil market for 1993. This is the first annual version of the review; previous reviews (1986 to March 1993) were published quarterly. Statistics and discussion are given for refined petroleum product demand, drilling and exploration activity, crude oil supply and disposition, major oil pipelines, refinery activity, crude oil and petroleum product stocks, crude oil prices, and refined petroleum product prices. In 1993, demand for refined products continued to slowly recover against a background of generally stable prices. Drilling activity nearly doubled from 1992, due to such factors as royalty relief, rising demand, improved prices, and lower interest rates. Crude oil production rose nearly 10% over the last two years, with most of the rise occurring in 1993, and imports in 1993 reached their highest level in 15 years. Deliveries of crude to Canadian refineries rose in almost all regions. Half of Canadian crude production was exported, and the 1993 oil trade surplus reached a record $3.4 billion. Monthly Interprovincial PipeLines apportionment levels reached record highs in 1993. Refinery rationalization continued and capacity fell 6%, raising average refinery utilization to 84%. The price of Canadian sweet crude declined 7% to a five-year low. 45 figs., 9 tabs

  5. British annual energy review of 1992/93

    International Nuclear Information System (INIS)

    1993-09-01

    This document from the British Energy Association consists of contributions from United Kingdom authors on aspects of power generation and energy supply. The review covers the year 1992 to 1993 and features a survey on renewable energy developments in the United Kingdom. The articles stress links between energy availability and social and economic development, as well as the environmental impact of the various energy sources discussed. (UK)

  6. JAERI TIARA annual report vol. 2 (1992)

    International Nuclear Information System (INIS)

    Ishigaki, Isao; Tanaka, Ryuichi; Nashiyama, Isamu; Naramoto, Hirosi; Omichi, Hideki; Toraishi, Akio; Watanabe, Hiromasa; Watanabe, Hiroshi

    1993-12-01

    This annual report describes research activities which have been performed with the JAERI TIARA (Takasaki Ion Accelerators for Advanced Radiation Application) facilities from April 1, 1992 to March 31, 1993. Summary reports of 60 papers and brief descriptions on status of TIARA in the period are contained. A list of publications, the type of research collaborations and organization of TIARA are also given as appendices. (author)

  7. 1993 Pacific Northwest Loads and Resources Study, Technical Appendix: Volume 2, Book 1, Energy.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-12-01

    The 1993 Pacific Northwest Loads and Resources Study establishes the Bonneville Power Administration`s (BPA) planning basis for supplying electricity to BPA customers. The Loads and Resources Study is presented in three documents: (1) this technical appendix detailing loads and resources for each major Pacific and Northwest generating utility, (2) a summary of Federal system and Pacific Northwest region loads and resources, and (3) a technical appendix detailing forecasted Pacific Northwest economic trends and loads. This analysis updates the 1992 Pacific Northwest Loads and Resources Study Technical Appendix published in December 1992. This technical appendix provides utility-specific information that BPA uses in its long-range planning. It incorporates the following for each utility (1) Electrical demand firm loads; (2) Generating resources; and (3) Contracts both inside and outside the region. This document should be used in combination with the 1993 Pacific Northwest Loads and Resources Study, published in December 1993, because much of the information in that document is not duplicated here.

  8. Survival Estimates for the Passage of Spring-Migrating Juvenile Salmonids through Snake and Columbia River Dams and Reservoirs, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Zabel, Richard; Williams, John G.; Smith, Steven G. (Northwest and Alaska Fisheries Science Center, Fish Ecology Division, Seattle, WA)

    2002-06-01

    In 2001, the National Marine Fisheries Service and the University of Washington completed the ninth year of a study to estimate survival and travel time of juvenile salmonids (Oncorhynchus spp.) passing through dams and reservoirs on the Snake and Columbia Rivers. All estimates were derived from passive integrated transponder (PIT)-tagged fish. We PIT tagged and released at Lower Granite Dam a total of 17,028 hatchery and 3,550 wild steelhead. In addition, we utilized fish PIT tagged by other agencies at traps and hatcheries upstream of the hydropower system and sites within the hydropower system. PIT-tagged smolts were detected at interrogation facilities at Lower Granite, Little Goose, Lower Monumental, McNary, John Day, and Bonneville Dams and in the PIT-tag detector trawl operated in the Columbia River estuary. Survival estimates were calculated using the Single-Release Model. Primary research objectives in 2001 were to: (1) estimate reach and project survival and travel time in the Snake and Columbia Rivers throughout the yearling chinook salmon and steelhead migrations; (2) evaluate relationships between survival estimates and migration conditions; and (3) evaluate the survival-estimation models under prevailing conditions. This report provides reach survival and travel time estimates for 2001 for PIT-tagged yearling chinook salmon and steelhead (hatchery and wild) in the Snake and Columbia Rivers. Results are reported primarily in the form of tables and figures with a minimum of text. More details on methodology and statistical models used are provided in previous reports cited in the text. Results for summer-migrating chinook salmon will be reported separately.

  9. Columbia River Coordinated Information System (CIS), 1992-1993 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rowe, Mike; Roger, Phillip B.; O' Connor, Dick

    1993-11-01

    The purposes of this report are to: (1) describe the project to date; (2) to document the work and accomplishments of the (CIS) project for Fiscal Year 1993; and (3) to provide a glimpse of future project direction. The concept of a Coordinated Information System (CIS) as an approach to meeting the growing needs for regionally standardized anadromous fish information.

  10. California energy flow in 1993

    Energy Technology Data Exchange (ETDEWEB)

    Borg, I.Y.; Briggs, C.K.

    1995-04-01

    Energy consumption in the state of California decreased about 3% in 1993 reflecting continuation of the recession that was manifest in a moribund construction industry and a high state unemployment that ran counter to national recovery trends. Residential/commercial use decreased slightly reflecting a mild winter in the populous southern portion of the state, a decrease that was offset to some extent by an increase in the state population. Industrial consumption of purchased energy declined substantially as did production of self-generated electricity for in-house use. Consumption in the transportation sector decreased slightly. The amount of power transmitted by the utilities was at 1992 levels; however a smaller proportion was produced by the utilities themselves. Generation of electricity by nonutilities, primarily cogenerators and small power producers, was the largest of any state in the US. The growth in the number of private power producers combined with increased amounts of electricity sold to the public utilities set the stage for the sweeping proposals before the California Public Utility Commission to permit direct sales from the nonutilities to retail customers. California production of both oil and natural gas declined; however, to meet demand only the imports of natural gas increased. A break in the decade-long drought during the 1992--1993 season resulted in a substantial increase in the amount of hydroelectricity generated during the year. Geothermal energy`s contribution increased substantially because of the development of new resources by small power producers. Decline in steam production continued at The Geysers, the state`s largest field, principally owned and managed by a public utility. Increases in windpower constituted 1--1/2% of the total electric supply--up slightly from 1992. Several solar photo voltaic demonstration plants were in operation, but their contribution remained small.

  11. User-needs study for the 1993 residential energy consumption survey

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-24

    During 1992, the Energy Information Administration (EIA) conducted a user-needs study for the 1993 Residential Energy Consumption Survey (RECS). Every 3 years, the RECS collects information on energy consumption and expenditures for various classes of households and residential buildings. The RECS is the only source of such information within EIA, and one of only a few sources of such information anywhere. EIA sent letters to more than 750 persons, received responses from 56, and held 15 meetings with users. Written responses were also solicited by notices published in the April 14, 1992 Federal Register and in several energy-related publications. To ensure that the 1993 RECS meets current information needs, EIA made a specific effort to get input from policy makers and persons needing data for forecasting efforts. These particular needs relate mainly to development of the National Energy Modeling System and new energy legislation being considered at the time of the user needs survey.

  12. The Nordic programme for nuclear safety 1990-1993. Report for 1992

    International Nuclear Information System (INIS)

    1993-04-01

    The annual report contains the coordinators' summary of the results so far achieved by the in all 18 current projects in which 200 persons are taking part. In some cases the project leader's account is included. An overview is given of the programme's costs and orders during 1992 in relation to the subsidies given to the individual projects. The fields covered by these projects are emergency readiness in radiation situations which are not normal, nuclear wastes and their disposal, radioecology, reactor safety - knowledge readiness, and coordination efforts. An economical overview is given and English summaries of the projects presented at the summer meeting in 1992 are presented. A list of the names of the members of the Nordic Nuclear Safety Research members in the syndicate and reference groups is included in the publication, and a brief description is to be found of the institution's activities. (AB) (78 refs.)

  13. Long-term trends in U.S. gas transportation: 1992 edition of the GRI baseline projection of U.S. energy supply and demand to 2010, June 1992. Gas Research Insights

    International Nuclear Information System (INIS)

    Lihn, M.L.; Woods, T.J.

    1992-06-01

    The paper summarizes the trends in lower-48 gas transportation in the 1992 Edition of the GRI Baseline Projection of U.S. Energy Supply and Demand to 2010, which has been adopted as a major input to the planning cycle leading to the development of the Gas Research Institute (GRI) 1993 research and development program. The 1992 projection presents an optimistic outlook for the U.S. gas industry in which increased gas supply can be obtained at competitive prices

  14. Renaissance Energy Ltd. annual report, 1992

    International Nuclear Information System (INIS)

    1993-01-01

    Renaissance Energy is a Calgary-based oil and gas company whose operations are conducted exclusively on the Alberta plains. Participation in working prospects is either by direct acquisition of petroleum and natural gas leases or by farm-in arrangements whereby an interest is earned by exploration expenditures. Renaissance also purchases producing, non-producing, and exploratory properties in Alberta. In 1992, the company produced 9,479,000 bbl of oil and 77.7 billion ft 3 of natural gas. Proven and probable reserves totalled 119.2 million bbl oil and 961.3 billion ft 3 of gas. Of the 739 wells drilled in 1992, 265 were dry, 317 were oil wells, and 157 were gas wells. Gross revenues were $266.1 million and net income was $24.6 million. Net undeveloped land holdings totalled 2,159,000 acres. Future exploration efforts will be directed to natural gas; of the 850 wells planned to be drilled in 1993, 500 will be natural gas prospects. Corporate and operating information for 1992 are presented along with consolidated financial statements. 29 figs., 36 tabs

  15. [Cyclotron based nuclear science]. Progress in research, April 1, 1992--March 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-07-01

    The period 1 April 1992--31 March 1993 saw the initial runs of three new spectrometers, which constitute a major portion of the new detection capabilities developed for this facility. These devices are the Proton Spectrometer (PSP) (data from which are shown on the cover of this document), the Mass Achroniat Recoil Mass Spectrometer (MARS), and the Multipole Dipole Multipole (MDM) Particle Spectrometer. The ECR-K500 cyclotron combination operated 5,849 hours. The beam was on target 39% of this time. Studies of nuclear dynamics and nuclear thermodynamics using the neutron ball have come to fruition. A critical re-evaluation of the available data on the giant monopole resonance indicated that the incompressibility is not specified to a range smaller than 200--350 MeV by those data. New systematic experiments using the MDM spectrometer are now underway. The MEGA collaboration obtained the first data on the {mu} {yields} e{gamma} decay rate and determination of the Michel parameter in normal {mu} decay. Experiments appear to confirm the existence of monoenergetic pair peaks even for relatively low Z{sub projectile} -- Z{sub target} combinations. Studies of the ({alpha},2{alpha}) knockout reaction indicate that this reaction may prove to be a valuable tool for determination of reaction rates of astrophysical interest. Theoretical work reported in this document ranges from nuclear structure calculations using the IBM-2 model to calculations of kaon production and the in-medium properties of the rho and phi mesons. Nuclear dynamics and exotic shapes and fragmentation modes of hot nuclei are also addressed. New measurements of x-ray emission from highly ionized ions, of molecular dissociation and of surface interactions are reported. The research is presented in nearly 50 brief summaries usually including data and references.

  16. Gulf Canada Resources Ltd. annual information form for the year ended December 31, 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Gulf Canada Resources is a major Canadian explorer and producer of oil and natural gas. Important areas of activity are Western Canada, Indonesia, and Russia. The company has interests in Canadian frontier lands (east coast offshore and Arctic), operates gas processing plants and pipelines, and participates in oil sands projects in Alberta. Gulf Canada activities for 1993 are reviewed, with descriptions of Canadian and international operations along with financial statements and associated information. Key financial actions taken in 1993 included completion of an asset sale program which facilitated the company strategy of focusing on a small number of core properties. Sales volumes reflected those asset sales as well as infrastructure constraints. Gross liquids sales averaged 90,000 bbl/d, down from 91,400 bbl/d in 1992, and gross natural gas sales averaged 270 million ft 3 /d, compared with 292 million ft 3 /d in 1992. The asset sales enabled reduction of net debt by 28% to $947 million. Capital spending increased ca 20% from 1992 levels to $169 million, and western Canada finding and development costs were reduced from 1992 levels to under $4/bbl of oil equivalent. Gross conventional reserves additions replaced ca 125% of production. Total financial loss for the year was $32 million, compared to a loss of $302 million in 1992. 13 figs., 10 tabs

  17. The effect of material properties on the seismic performance of Arch Dams

    Directory of Open Access Journals (Sweden)

    B. Sevim

    2011-08-01

    Full Text Available The paper investigates the effect of material properties on the seismic performance of arch dam-reservoir-foundation interaction systems based on the Lagrangian approach using demand-capacity ratios. Type-5 arch dam is selected as a numerical application. The linear time history analyses of the arch dam-reservoir-foundation interaction system are carried out for different material properties. The foundation is taken into account as massless; behaviour of the reservoir is assumed to be linearly elastic, inviscid and irrotational. The north-south component of the Erzincan earthquake in 1992 is chosen as a ground motion. Dynamic equations of motions obtained from 3-D finite element modelling of the coupled system are solved by using the Newmark integration algorithm. The damage levels of the coupled system for the different material properties are demonstrated by using demand-capacity ratios and cumulative inelastic durations. The time histories and maximum values of the displacements and principal stresses, and performance curves, are obtained from linear analyses. It is clearly seen from the study that the different material properties affect the seismic behaviour of the dam.

  18. Tailings dams from the perspective of conventional dam engineering

    International Nuclear Information System (INIS)

    Szymanski, M.B.

    1999-01-01

    A guideline intended for conventional dams such as hydroelectric, water supply, flood control, or irrigation is used sometimes for evaluating the safety of a tailings dam. Differences between tailings dams and conventional dams are often substantial and, as such, should not be overlooked when applying the techniques or safety requirements of conventional dam engineering to tailings dams. Having a dam safety evaluation program developed specifically for tailings dams is essential, if only to reduce the chance of potential errors or omissions that might occur when relying on conventional dam engineering practice. This is not to deny the merits of using the Canadian Dam Safety Association Guidelines (CDSA) and similar conventional dam guidelines for evaluating the safety of tailings dams. Rather it is intended as a warning, and as a rationale underlying basic requirement of tailings dam emgineering: specific experience in tailings dams is essential when applying conventional dam engineering practice. A discussion is included that focuses on the more remarkable tailings dam safety practics. It is not addressed to a technical publications intended for such dams, or significantly different so that the use of conventional dam engineering practice would not be appropriate. The CDSA Guidelines were recently revised to include tailings dams. But incorporating tailings dams into the 1999 revision of the CDSA Guidelines is a first step only - further revision is necessary with respect to tailings dams. 11 refs., 2 tabs

  19. Profits for OGJ group show big gain in 1993; revenues dip

    International Nuclear Information System (INIS)

    Beck, R.J.; Sanders, V.

    1994-01-01

    Earnings for Oil ampersand Gas Journal's group of 22 large US oil companies jumped sharply last year, increasing 78.6% from 1992. Profits totaled $16.2 billion in 1993, compared with $9.1 billion in 1992. This is in sharp contrast to performance in 1992, when group net income fell 47%. That was due mainly to costs related to restructuring, staff reductions, and adoption of new accounting rules. The new rules moved forward some charges stemming from future retirement benefits and caused a substantial slide in 1992 profits for a number of companies. The absence of similar charges last year was a major reason for the increase in earnings. The paper describes the earnings by sector, oil and gas prices, financial indicators, exploration and production activities, refining and marketing activities, earnings from petrochemicals, capital spending, and the outlook for 1994 performance

  20. Monitoring the Migrations of Wild Snake River Spring/Summer Chinook Salmon Smolts, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Achord, Stephen; McNatt, Regan A.; Hockersmith, Eric E. (National Marine Fisheries Service, Northwest Fisheries Science Center, Fish Ecology Division, Seattle, WA)

    2004-04-01

    estimate survival of different wild juvenile fish stocks as they emigrate from their natal rearing areas. This study provides critical information for recovery planning, and ultimately recovery for these ESA-listed wild fish stocks. This report provides information on PIT tagging of wild chinook salmon parr in 2002 and the subsequent monitoring of these fish. Fish were monitored as they migrated through two in-stream PIT-tag monitoring systems in lower Valley Creek and at juvenile migrant traps in 2002 and 2003 as well as through interrogation systems at Lower Granite, Little Goose, Lower Monumental, McNary, John Day, and Bonneville Dams during 2003. Fish were also monitored by the PIT-tag trawl in the mouth of the Columbia River in 2003. In 2002-2003, we also continued to collect environmental data for the Baseline Environmental Monitoring Program, which was developed from 1993 to 1997. The project was designed to collect data for use in conjunction with data on parr and smolt movements to discern patterns or characteristic relationships between these movements and environmental factors. Water quality data collected consist of water temperature, dissolved oxygen, specific conductance, turbidity, water depth, and pH measured at five monitoring stations in the Salmon River Basin, Idaho.

  1. Report on the bituminous coal liquefaction sub-committee in fiscal 1993; 1993 nendo rekiseitan ekika bukai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-01

    This paper reports the activities of the bituminous coal liquefaction sub-committee in fiscal 1993. With an intention of developing a technology on the process (NEDOL) suitable for liquefaction of wide range of coal types placing sub-bituminous coal at the center, researches were carried out by using a pilot plant, and engineering data purposed for practical application of the technology were acquired. The construction of the pilot plant, launched in fiscal 1991, will be performed under the operation research plan for efficient operation, based on the result of discussing the total project cost in fiscal 1992. The status of constructing the 150-t/d pilot plant in fiscal 1993 is in the phase of making the foundations subsequently from fiscal 1992, procurement of devices and construction materials, constructions of iron structures, installation, heat insulation, and painting, and building the central control building and piping facilities outside the battery limit. The paper also reports the tests and investigations on improving performance of natural pylite catalyst, the tests and investigations on improving performance of circulating solvent, and the technological investigations on structuring a liquefying reaction data analyzing system. For the supportive researches on the pilot plant, the paper describes studies by using a 1-t/d PSU, studies on coal liquefaction conditions, studies on synthesized iron sulfide catalysts, and studies on solvent hydrogenating catalysts. A comprehensive discussion was also given. (NEDO)

  2. NASA Space Geodesy Program: GSFC data analysis, 1993. VLBI geodetic results 1979 - 1992

    Science.gov (United States)

    Ma, Chopo; Ryan, James W.; Caprette, Douglas S.

    1994-01-01

    The Goddard VLBI group reports the results of analyzing Mark 3 data sets acquired from 110 fixed and mobile observing sites through the end of 1992 and available to the Space Geodesy Program. Two large solutions were used to obtain site positions, site velocities, baseline evolution for 474 baselines, earth rotation parameters, nutation offsets, and radio source positions. Site velocities are presented in both geocentric Cartesian and topocentric coordinates. Baseline evolution is plotted for the 89 baselines that were observed in 1992 and positions at 1988.0 are presented for all fixed stations and mobile sites. Positions are also presented for quasar radio sources used in the solutions.

  3. Inventory of thermal solar energy systems in the Netherlands: Period 1975-1992

    International Nuclear Information System (INIS)

    Warmerdam, J.M.; Stap, C.A.M.

    1993-10-01

    An overview is given of the number of active thermal solar energy systems that have been installed in the Netherlands during the period 1975-1992. By the end of 1992, 8,300 systems have been installed, of which 6,000 were domestic solar hot water systems. The uncertainty in these figures is 10%. Several sources were used to determine the number of systems installed. The two main sources were the files of the solar industry association 'Holland Solar' (data until 1988), and the Dutch subsidy administrator 'Senter' for data from 1988 up to and including 1992. At the end of 1992 preparations were made for the installation of approximately 3,000 domestic solar water heaters in 1993. It is recommended to carry out an inventory every three months and to compile data on investment costs. 17 figs., 7 appendices

  4. FY 1992 report on the Coal Kind Committee; 1992 nendo tanshu iinkai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-01

    The paper reported the FY 1992 activities of the Coal Kind Committee. The Coal Kind Committee in this fiscal year was held on September 28, 1992 (1st) and on March 4, 1993 (second), and report/discussion were made about the performance test in Chinese coal liquefaction, survey of coal kind selection, development of handling technology, etc. As to the performance test in Chinese coal liquefaction, there were the data very different in quality among the data, and it was pointed out that it was necessary to make a close re-examination of sites for sample collection and sampling methods. Relating to the survey of coal kind selection, the following were pointed out: The inertinite value in the maceral analysis was not necessarily in agreement with the reactivity; The inertinite was dependent largely on temperature for the reaction; It was necessary to make parameters based on the chemical structure. As to the development of the coal utilization hydrogen production technology, the paper reported the experimental survey of coal pretreatment, development of new deheterocyclicity and deashing technologies, experimental survey of coal handling, etc. (NEDO)

  5. Environmental Sciences Division annual progress report for period ending September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    This progress report summarizes the research and development activities conducted in the Environmental Sciences Division (ESD) of Oak Ridge National Laboratory during fiscal year (FY) 1993, which extended from October 1, 1992, through September 30, 1993. The report is structured to provide descriptions of current activities and accomplishments in each of the division`s major organizational units. Following the sections describing the organizational units are sections highlighting ESD Scientific, Technical, and Administrative Achievement awards and listing information necessary to convey the scope of the work in the division. An organizational chart of staff and long-term guests who were in ESD and the end of FY 1993 is located in the final section of the report.

  6. Environmental Sciences Division annual progress report for period ending September 30, 1993

    International Nuclear Information System (INIS)

    1994-05-01

    This progress report summarizes the research and development activities conducted in the Environmental Sciences Division (ESD) of Oak Ridge National Laboratory during fiscal year (FY) 1993, which extended from October 1, 1992, through September 30, 1993. The report is structured to provide descriptions of current activities and accomplishments in each of the division's major organizational units. Following the sections describing the organizational units are sections highlighting ESD Scientific, Technical, and Administrative Achievement awards and listing information necessary to convey the scope of the work in the division. An organizational chart of staff and long-term guests who were in ESD and the end of FY 1993 is located in the final section of the report

  7. Progress in research, April 1, 1992--March 31, 1993, Texas A and M University Cyclotron Institute

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-07-01

    This Institute annual report for the period 1 April 1992--31 March 1993 covers a period which has seen the initial runs of three new spectrometers which constitute a major portion of the new detection capabilities developed for this facility. These devices are the Proton Spectrometer (PSP), the Mass Achromat Recoil Mass Spectrometer (MARS), and the Multipole dipole Multipole (MDM) Particle Spectrometer. These devices are now available to pursue the studies of Gamow Teller states, reactions of astrophysical interest, and giant resonance studies for which they were constructed, as well as for other experiments. A beam analysis system which will deliver high resolution beams to the MDM spectrometer is currently under construction. With the completion of these spectrometer projects, the facility emphasis is now focused on the development of the full capabilities of the K500 cyclotron and on the research program. During the report period, the ECR-K500 cyclotron combination operated 5,849 hours. Theoretical work reported in this document ranges from nuclear structure calculations using the IBM-2 model to calculations of kaon production and the in-medium properties of the rho and phi mesons, the latter as a probe of the QCD phase transition. Nuclear dynamics and exotic shapes and fragmentation modes of hot nuclei are also addressed. In atomic physics, new measurements of x-ray emission from highly ionized ions, of molecular dissociation and of surface interactions are reported.

  8. Progress in research, April 1, 1992 - March 31, 1993, Texas A and M University Cyclotron Institute

    International Nuclear Information System (INIS)

    1993-07-01

    This Institute annual report for the period 1 April 1992--31 March 1993 covers a period which has seen the initial runs of three new spectrometers which constitute a major portion of the new detection capabilities developed for this facility. These devices are the Proton Spectrometer (PSP), the Mass Achromat Recoil Mass Spectrometer (MARS), and the Multipole dipole Multipole (MDM) Particle Spectrometer. These devices are now available to pursue the studies of Gamow Teller states, reactions of astrophysical interest, and giant resonance studies for which they were constructed, as well as for other experiments. A beam analysis system which will deliver high resolution beams to the MDM spectrometer is currently under construction. With the completion of these spectrometer projects, the facility emphasis is now focused on the development of the full capabilities of the K500 cyclotron and on the research program. During the report period, the ECR-K500 cyclotron combination operated 5,849 hours. Theoretical work reported in this document ranges from nuclear structure calculations using the IBM-2 model to calculations of kaon production and the in-medium properties of the rho and phi mesons, the latter as a probe of the QCD phase transition. Nuclear dynamics and exotic shapes and fragmentation modes of hot nuclei are also addressed. In atomic physics, new measurements of x-ray emission from highly ionized ions, of molecular dissociation and of surface interactions are reported

  9. Annual energy outlook 1993 with projections to 2010

    International Nuclear Information System (INIS)

    1992-01-01

    The Energy Information Administration's (EIA's) Annual Energy Outlook 1993 (AEO93) presents forecasts for energy prices, supply, demand, and imports over the period 1990 to 2010. These projections take into account existing legislation, including the Energy Policy Act of 1992. Even though the world oil market remains relatively tight, the long-term outlook for oil prices has been revised downward since the Annual Energy Outlook 1992 as expectations for both the Organization of Petroleum Exporting Countries (OPEC) and non-OPEC production potential have been revised upward. Domestic natural gas prices are also expected to be lower than projected last year, in part because of a more optimistic outlook for drilling technology. Finally, lower growth in the demand for electricity is expected because of the Energy Policy Act of 1992, which mandates efficiency standards for new energy-using equipment. These are the most striking differences between last year's EIA evaluation of long-term energy market trends and this year's evaluation

  10. European pipelines spill near record amounts in 1993

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    European pipelines in 1993 spilled as much crude oil and petroleum products as in any year since 1971, when statistics first began to be reported. Final cost of cleanup will exceed $10 million, by far the most ever spent by western European oil pipelines operating on land. This cost figure is only preliminary: costs for three spills totaling nearly 2,600 cu m (approximately 16,380 bbl; 43.6% of total spilled) had not been reported through November 1994. Ten incidents of oil spills from pipelines occurred in 1993, compared with seven for 1992 and an average of 12.7/year since 1971. Total length of oil industry cross-country pipelines operating in Western Europe at the end of 1993 was 21,600 km, up from nearly 19,000 km in 1989. In all, 601 million cu m (3.8 billion bbl) of crude oil and refined products moved through the pipeline system. The paper briefly describes several of the accidents

  11. Water Science and Technology Board. Annual report 1992-1993

    Energy Technology Data Exchange (ETDEWEB)

    1995-01-01

    This report summarizes the activities of the Water Science and Technology Board during 1992. The WSTB is intended to be a dynamic forum, a mechanism by which the broad community of water science, technology, and policy professionals can help assure high-quality national water programs. The principal products of WSTB studies are written reports which cover a wide range of water resources issues of current national concern. A few recent examples are: Managing wastewater in coastal urban areas; Ground water vulnerability assessment; Water transfers in the West - efficiency, equity and the environment; and Opportunities in the hydrologic sciences. Projects completed, ongoing studies and published reports are described in detail in their respective sections of this report.

  12. Nuclear structure studies at intermediate energy. Final report, September 1992--May 1995

    International Nuclear Information System (INIS)

    Hintz, N.M.

    1995-06-01

    This constitutes a final report for a two-year grant ending 31 December, 1993, and an additional grant of $15,000 for the period 1 January 1993 to 30 September 1994. At the beginning of 1993 the group consisted of the Principal Investigator (N.H.), two full-time Research Associates (A.S. and V.S.), one part-time Research Associate (M.F.) and one graduate Research Assistant (D.M.). At present only the Principal Investigator in continuing. This report covers the period from September 1992 to April 1995. During this period experiment E 352, '' 208 Pb and 60 Ni (p,t) reaction at 120 MeV'' was completed at the Indiana University Cyclotron Facility (IUCF). A Ph.D. has been awarded (D.M.) on the basis of this work and LAMPF (Los Alamos Meson Physics Facility) E 1201, ''The 40 Ca, (p,2p) reaction at 800 MeV''. A paper on the 208 Pb (p,t) experiment is being prepared for publication, In addition, five papers by members of this group, and four with other collaborators have been published since our last report (September 1992). At present we have one approved experiment (E 1201 above) in the LAMPF cue, but it is unlikely that it will ever be scheduled

  13. Interim Columbia and Snake rivers flow improvement measures for salmon: Final Supplemental Environmental Impact Statement (SEIS)

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    Public comments are sought on this final SEIS, which supplements the 1992 Columbia River Salmon Flow Measures Options Analysis (OA)/Environmental Impact Statement (EIS). The Corps of Engineers, in cooperation with the Bonneville Power Administration and the Bureau of Reclamation proposes five alternatives to improve flows of water in the lower Columbia-Snake rivers in 1993 and future years to assist the migration of juvenile and adult anadromous fish past eight hydropower dams. These are: (1) Without Project (no action) Alternative, (2) the 1992 Operation, (3) the 1992 Operation with Libby/Hungry Horse Sensitivity, (4) a Modified 1992 Operation with Improvements to Salmon Flows from Dworshak, and (5) a Modified 1992 Operation with Upper Snake Sensitivity. Alternative 4, Modified 1992 Operations, has been identified as the preferred alternative.

  14. No. 2 heating oil/propane program. Final report, 1992/93

    Energy Technology Data Exchange (ETDEWEB)

    McBrien, J.

    1993-05-01

    During the 1992--93 heating season, the Massachusetts Division Energy Resources (DOER) participated in a joint data collection program between several state energy offices and the federal Department of Energy`s (DOE) Energy Information Administration (EIA). The purpose of the program was to collect and monitor retail and wholesale heating oil and propane prices and inventories from October, 1992 through March, 1993. This final report begins with an overview of the unique events which had an impact on the petroleum markets prior to and during the reporting period. Next, the report summarizes the results from residential heating oil and propane price surveys conducted by DOER over the 1992--93 heating season. The report also incorporates the wholesale heating oil and propane prices and inventories collected by the EIA and distributed to the states. Finally, the report outlines DOER`s use of the data.

  15. Natural gas productive capacity for the lower 48 states, 1982--1993

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of this report is to analyze monthly natural gas wellhead productive capacity and project this capacity for 1992 and 1993, based upon historical production data through 1991. Productive capacity is the volume of gas that can be produced from a well, reservoir, or field during a given period of time against a certain wellhead back-pressure under actual reservoir conditions excluding restrictions imposed by pipeline capacity, contracts, or regulatory bodies. For decades, natural gas supplies and productive capacity have been adequate, although in the 1970's the capacity surplus was small because of market structure (both interstate and intrastate), increasing demand, and insufficient drilling. In the early 1980's, lower demand together with increased drilling led to a large surplus of natural gas capacity. After 1986, this large surplus began to decline as demand for gas increased, gas prices dropped, and gas well completions dropped sharply. In late December 1989, this surplus decline, accompanied by exceptionally high demand and temporary weather-related production losses, led to concerns about the adequacy of monthly productive capacity for natural gas. This study indicates that monthly productive capacity will drop sharply during the 1992-1993 period. In the low gas price, low drilling case, gas productive capacity and estimated production demand will be roughly equal in December 1993. In base and high drilling cases, monthly productive capacity should be able to meet normal production demands through 1993 in the lower 48 States. Exceptionally high peak-day or peak-week production demand might not be met because of physical limitations. Beyond 1993, as the capacity of currently producing wells declines, a sufficient number of wells and/or imports must be added each year in order to ensure an adequate gas supply

  16. A systematic assessment of the state of hazardous waste clean-up technologies. Quarterly technical progress report, April 1--June 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Berg, M.T.; Reed, B.E.; Gabr, M.

    1993-07-01

    West Virginia University (WVU) and the US DOE Morgantown Energy Technology Center (METC) entered into a Cooperative Agreement on August 29, 1992 entitled ``Decontamination Systems Information and Research Programs.`` Stipulated within the Agreement is the requirement that WVU submit to METC a series of Technical Progress Report for Year 1 of the Agreement. This report reflects the progress and/or efforts performed on the following nine technical projects encompassed by the Year 1 Agreement for the period of April 1 through June 30, 1993: Systematic assessment of the state of hazardous waste clean-up technologies; site remediation technologies -- drain-enhanced soil flushing (DESF) for organic contaminants removal; site remediation technologies -- in situ bioremediation of organic contaminants; excavation systems for hazardous waste sites; chemical destruction of polychlorinated biphenyls; development of organic sensors -- monolayer and multilayer self-assembled films for chemical sensors; Winfield lock and dam remediation; Assessments of Technologies for hazardous waste site remediation -- non-treatment technologies and pilot scale test facility implementation; and remediation of hazardous sites with stream reforming.

  17. Acidentes de trabalho em Barcelona (Espanha, no período de 1992-1993

    Directory of Open Access Journals (Sweden)

    Rosana F. Sampaio

    1998-08-01

    Full Text Available INTRODUÇÃO: As estatísticas dos acidentes de trabalho, como qualquer outro sistema de notificação, devem servir de base para determinar prioridades e decidir quais medidas preventivas devem ser adotadas. Neste contexto, o objetivo do estudo é aprofundar a análise dos acidentes de trabalho através da utilização de técnicas estatísticas descritivas que permitam estabelecer a relação entre o número de acidentes de trabalho ocorridos em Barcelona (Espanha e as variáveis tipo de acidente, setor econômico, tamanho da empresa e tipo de contrato. MÉTODO: Como fonte de dados foi utilizado o sistema de notificação de acidentes graves e mortais ocorridos na cidade de Barcelona (Espanha, entre 1992 e 1993. Foram examinados 848 registros de acidentes de trabalho em trabalhadores do sexo masculino e a partir desses dados efetuou-se uma análise mediante modelos log-lineares. RESULTADOS E CONCLUSÕES: Os resultados evidenciam que os acidentes traumáticos e o setor de construção têm uma associação positiva, verificada, da mesma forma, entre os acidentes de trânsito e o setor de serviços. Os acidentes traumáticos e de trânsito apresentaram uma associação com as pequenas empresas e os acidentes não traumáticos demonstraram associar-se com as grandes empresas. Verificou-se, ainda, associação entre os trabalhadores temporais e o setor da construção frente aos trabalhadores com contrato fixo, em que se constatou uma associação com os setores de indústria e de serviços. Foi verificada associação positiva entre os acidentes ocorridos com os trabalhadores temporais e as pequenas e médias empresas.

  18. Acidentes de trabalho em Barcelona (Espanha, no período de 1992-1993

    Directory of Open Access Journals (Sweden)

    Sampaio Rosana F.

    1998-01-01

    Full Text Available INTRODUÇÃO: As estatísticas dos acidentes de trabalho, como qualquer outro sistema de notificação, devem servir de base para determinar prioridades e decidir quais medidas preventivas devem ser adotadas. Neste contexto, o objetivo do estudo é aprofundar a análise dos acidentes de trabalho através da utilização de técnicas estatísticas descritivas que permitam estabelecer a relação entre o número de acidentes de trabalho ocorridos em Barcelona (Espanha e as variáveis tipo de acidente, setor econômico, tamanho da empresa e tipo de contrato. MÉTODO: Como fonte de dados foi utilizado o sistema de notificação de acidentes graves e mortais ocorridos na cidade de Barcelona (Espanha, entre 1992 e 1993. Foram examinados 848 registros de acidentes de trabalho em trabalhadores do sexo masculino e a partir desses dados efetuou-se uma análise mediante modelos log-lineares. RESULTADOS E CONCLUSÕES: Os resultados evidenciam que os acidentes traumáticos e o setor de construção têm uma associação positiva, verificada, da mesma forma, entre os acidentes de trânsito e o setor de serviços. Os acidentes traumáticos e de trânsito apresentaram uma associação com as pequenas empresas e os acidentes não traumáticos demonstraram associar-se com as grandes empresas. Verificou-se, ainda, associação entre os trabalhadores temporais e o setor da construção frente aos trabalhadores com contrato fixo, em que se constatou uma associação com os setores de indústria e de serviços. Foi verificada associação positiva entre os acidentes ocorridos com os trabalhadores temporais e as pequenas e médias empresas.

  19. Land cover and vegetation data from an ecological survey of "key habitat" landscapes in England, 1992-1993

    Science.gov (United States)

    Wood, Claire M.; Bunce, Robert G. H.; Norton, Lisa R.; Smart, Simon M.; Barr, Colin J.

    2018-05-01

    Since 1978, a series of national surveys (Countryside Survey, CS) have been carried out by the Centre for Ecology and Hydrology (CEH) (formerly the Institute of Terrestrial Ecology, ITE) to gather data on the natural environment in Great Britain (GB). As the sampling framework for these surveys is not optimised to yield data on rarer or more localised habitats, a survey was commissioned by the then Department of the Environment (DOE, now the Department for Environment, Food and Rural Affairs, DEFRA) in the 1990s to carry out additional survey work in English landscapes which contained semi-natural habitats that were perceived to be under threat, or which represented areas of concern to the ministry. The landscapes were lowland heath, chalk and limestone (calcareous) grasslands, coasts and uplands. The information recorded allowed an assessment of the extent and quality of a range of habitats defined during the project, which can now be translated into standard UK broad and priority habitat classes. The survey, known as the "Key Habitat Survey", followed a design which was a series of gridded, stratified, randomly selected 1 km squares taken as representative of each of the four landscape types in England, determined from statistical land classification and geological data ("spatial masks"). The definitions of the landscapes are given in the descriptions of the spatial masks, along with definitions of the surveyed habitats. A total of 213 of the 1 km2 square sample sites were surveyed in the summers of 1992 and 1993, with information being collected on vegetation species, land cover, landscape features and land use, applying standardised repeatable methods. The database contributes additional information and value to the long-term monitoring data gathered by the Countryside Survey and provides a valuable baseline against which future ecological changes may be compared, offering the potential for a repeat survey. The data were analysed and described in a series of

  20. Land cover and vegetation data from an ecological survey of "key habitat" landscapes in England, 19921993

    Directory of Open Access Journals (Sweden)

    C. M. Wood

    2018-05-01

    Full Text Available Since 1978, a series of national surveys (Countryside Survey, CS have been carried out by the Centre for Ecology and Hydrology (CEH (formerly the Institute of Terrestrial Ecology, ITE to gather data on the natural environment in Great Britain (GB. As the sampling framework for these surveys is not optimised to yield data on rarer or more localised habitats, a survey was commissioned by the then Department of the Environment (DOE, now the Department for Environment, Food and Rural Affairs, DEFRA in the 1990s to carry out additional survey work in English landscapes which contained semi-natural habitats that were perceived to be under threat, or which represented areas of concern to the ministry. The landscapes were lowland heath, chalk and limestone (calcareous grasslands, coasts and uplands. The information recorded allowed an assessment of the extent and quality of a range of habitats defined during the project, which can now be translated into standard UK broad and priority habitat classes. The survey, known as the "Key Habitat Survey", followed a design which was a series of gridded, stratified, randomly selected 1 km squares taken as representative of each of the four landscape types in England, determined from statistical land classification and geological data ("spatial masks". The definitions of the landscapes are given in the descriptions of the spatial masks, along with definitions of the surveyed habitats. A total of 213 of the 1 km2 square sample sites were surveyed in the summers of 1992 and 1993, with information being collected on vegetation species, land cover, landscape features and land use, applying standardised repeatable methods. The database contributes additional information and value to the long-term monitoring data gathered by the Countryside Survey and provides a valuable baseline against which future ecological changes may be compared, offering the potential for a repeat survey. The data were analysed and described

  1. Status of ground-water resources at U.S. Navy Support Facility, Diego Garcia; summary of hydrologic and climatic data, January 1992 through September 1994

    Science.gov (United States)

    Torikai, J.D.

    1995-01-01

    This report contains hydrologic and climatic data that describe the status of ground-water resources at U.S. Navy Support Facility, Diego Garcia. Data are presented from January 1992 through September 1994. This report concentrates on data from July through September 1994, and references historic data from 1992 through June 1994. Total rainfall for the first nine months of 1994 was about 77 inches which is 72 percent of the mean annual rainfall of 106 inches. In comparison, total rainfall for the first nine months of 1992 and 1993 was 67 inches and 69 inches, respectively. Annual rainfall totals in 1992 and 1993 were 93 inches and 95 inches, respectively. Ground-water withdrawal during July through September 1994 has averaged 919,400 gallons per day, while annual withdrawals in 1992 and 1993 averaged 935,900 gallons per day and 953,800 gallons per day, respectively. At the end of September 1994, the chloride concentration of the composite water supply was 56 milligrams per liter, well below the 250 milligrams per liter secondary drinking-water standard established by the U.S. Environmental Protection Agency. Chloride concentrations of the composite water supply from July through September 1994 ranged between 51 and 78 milligrams per liter. Chloride concentration of ground water in monitoring wells at Cantonment and Air Operations increased in July and August, but have leveled off or decreased in September. There has been a general trend of increasing chloride concentrations in the deeper monitoring wells since the 1992 dry season, which began in March 1992. A fuel leak at Air Operations caused the shutdown of ten wells in May 1991. Four of the wells resumed pumping for water-supply purposes in April 1992. The remaining six wells are being used to hydraulically contain and divert fuel migration by recirculating 150,000 gallons of water each day.

  2. The 1993 Canadian Association of Gastroenterology Strategic Plan: Excellence in Achievement

    Directory of Open Access Journals (Sweden)

    Richard Fedorak

    2003-01-01

    Full Text Available By the summer of 1990, the Canadian Association of Gastroenterology (CAG had been in existence as Canada’s premier gastroenterology society for nearly thirty years. The specialty of gastroenterology was in an exponential growth phase and many changes were on the horizon, including discussions as to whether the CAG should continue to conduct its annual meeting in conjunction with the Royal College meeting. In 1990, the CAG Governing Board and then president Dr Eldon Shaffer initiated a membership needs analysis (with technical assistance provided through the Strategic Planning Group at Searle Canada Inc to provide a foundation for a strategic planning process that was to carry forward over the next several years and ultimately produce the CAG’s first strategic planning document. After substantial review and assessment, the 1991/1992 and 1992/1993 CAG Governing Boards approved the 1993 CAG Strategic Plan. This strategic plan served the organization well over the past decade and has provided the cornerstone upon which the CAG advanced many progressive initiatives.

  3. Grouting of the cracks in the Arch 5-6 Daniel Johnson dam

    International Nuclear Information System (INIS)

    Lariviere, R.; Routhier, L.; Roy, V.; Saleh, K.; Tremblay, S.

    1999-01-01

    The Daniel-Johnson dam is located 800 km northeast of Montreal, PQ, and is 1314 m in length and 214 m high. Just after completion of dam construction different types of cracks started to appear on the upstream and downstream faces. During and after the construction of the dam, numerous cracks and joints were grouted in order to reduce water infiltration. In some cases, as a result of high injection pressures and inaccurate methods, the injections provoked the propagation of the existing cracks or the initiation of new ones. Because of this situation and to determine the contribution of injection to dam safety, in 1985, Hydro-Quebec applied a moratorium on all future injection work on the dam. Research work was initiated in 1986 in the areas of grouting materials, methods, equipment and behavioral analysis to establish a safe method for the injection of the cracks. A committee was formed in 1993 with members from various groups, in order to: carry out extensive behavioral analysis of the Arch 5-6 dam, carry out an investigation program in order to determine the cause of the increase of the water infiltration, undertake a structural analysis program in order to evaluate the impact of an injection on the safety of the dam, and identify the proper method and injection products to use. In 1997, as a result of the progress of the structural analysis studies and the injection research project, a decision was made to proceed with the injection of the dam. A description is included of the results of the investigation, recommendations and results of the injection research project, as well as some details of the grouting campaign carried out in January 1999. On the whole, a better knowledge was acquired of the structure, of the plunging cracks and the behaviour of the dam during the injection. In the field of injection methods, materials and equipment, research work was invaluable when it came to the injection of micro-fine cracks in concrete dams. 5 refs., 8 figs

  4. The larva of Drusus vinconi Sipahiler, 1992 (Trichoptera, Limnephilidae, Drusinae

    Directory of Open Access Journals (Sweden)

    Johann Waringer

    2013-07-01

    Full Text Available This paper describes the previously unknown larva of Drusus vinconi Sipahiler, 1992. Information on the morphology of the 5th larval instar is given, and the most important diagnostic features are illustrated. In the context of existing identification keys the larva of D. vinconi keys together with D. annulatus (Stephens, 1837, D. biguttatus (Pictet, 1834, D. ingridae Sipahiler, 1993, Hadimina torosensis Sipahiler, 2002 and Leptodrusus budtzi (Ulmer, 1913. These species differ in the contours of the pronotum in lateral view, the presence/absence of the pronotal transverse groove, the shape of the median notch of the pronotum (in anterior view, pronotal sculpturing, presence/absence of the lateral carina of the head capsule, the number of proximo-dorsal setae on the mid-and hind femora, where the lateral fringe starts on the abdomen, and in geographic distribution. With respect to zoogeography, Drusus vinconi is a (micro-endemic of the Western Pyrenees. The species prefers stony substratum in springs and springbrooks of the montane and subalpine region (Graf et al. 2008; Sipahiler 1992, 1993. As a grazer, the larvae of D. vinconi feed on biofilm and epilithic algae.

  5. Safety of high speed ground transportation systems: X2000 US demonstration vehicle dynamics trials, preliminary test report. Report for October 1992-January 1993

    Energy Technology Data Exchange (ETDEWEB)

    Whitten, B.T.; Kesler, J.K.

    1993-01-01

    The report documents the procedures, events, and results of vehicle dynamic tests carried out on the ASEA-Brown Boveri (ABB) X2000 tilt body trainset in the US between October 1992 and January 1993. These tests, sponsored by Amtrak and supported by the FRA, were conducted to assess the suitability of the X2000 trainset for safe operation at elevated cant deficiencies and speeds in Amtrak's Northeast Corridor under existing track conditions in a revenue service demonstration. The report describes the safety criteria against which the performance of the X2000 test train was examined, the instrumentation used, the test locations, and the track conditions. Preliminary results are presented from tests conducted on Amtrak lines between Philadelphia and Harrisburg, PA, and between Washington DC and New York NY, in which cant deficiencies of 12.5 inches and speeds of 154 mph were reached in a safe and controlled manner. The significance of the results is discussed, and preliminary conclusions and recommendations are presented.

  6. Directors' report and accounts for the year ended 31 March 1993

    International Nuclear Information System (INIS)

    1993-01-01

    The report of the Directors of Scottish Power for 1992/1993 is presented, and accounting policies, group profit and loss account, balance sheets and group cash flow statement are given. Notes concerning the accounts are included. The report of the Auditors is also presented, and the names of the directors, secretaries and advisors, and shareholder information is listed. (UK)

  7. Evaluation of the 1996 predictions of the run-timing of wild migrant spring/summer yearling chinook in the Snake River Basin using Program RealTime

    International Nuclear Information System (INIS)

    Townsend, R.L.; Yasuda, D.; Skalski, J.R.

    1997-03-01

    This report is a post-season analysis of the accuracy of the 1996 predictions from the program RealTime. Observed 1996 migration data collected at Lower Granite Dam were compared to the predictions made by RealTime for the spring outmigration of wild spring/summer chinook. Appendix A displays the graphical reports of the RealTime program that were interactively accessible via the World Wide Web during the 1996 migration season. Final reports are available at address http://www.cqs.washington.edu/crisprt/. The CRISP model incorporated the predictions of the run status to move the timing forecasts further down the Snake River to Little Goose, Lower Monumental and McNary Dams. An analysis of the dams below Lower Granite Dam is available separately

  8. Prevalencia de hepatitis B en un servicio de ginecobstetricia, 1992-1993

    Directory of Open Access Journals (Sweden)

    Martha Velandia

    1997-12-01

    Full Text Available Se llevó a cabo un estudio de seroprevalencia de la infección por el virus de la hepatitis Bb (VHB en el hospital de Honda (Tolima. La población objetivo estaba compuesta por mujeres que consultaron a los servicios de ginecobstetricia de diciembre de 1992 a enero de 1993. A todas se les practicaron pruebas para detectar infección por el VHB (antígeno de superficie, anticuerpo contra el antígeno central y anticuerpo contra el antígeno de superficie. En total, se encuestaron 246 mujeres entre los 15 y los 50 años. La prevalencia encontrada fue de 13% (32 positivas, la mitad de las personas infectadas (1 6 pacientes tenía el patrón de inmunidad adquirida por la infección mientras que el resto mostraba evidencia serológica de infección reciente (14 pacientes portaban el antígeno de superficie o el anticore. Los factores de riesgo diferían de acuerdo con el estado de infección analizado. En las personas con infección reciente, los factores de riesgo eran: tener tatuajes (CSP=14,8 IC 95% 0,65-332; tener dos y más compañeros sexuales (CSP=4,3 IC 95% 0,99-12,9 y CSP=8,1 IC 95% 1,l-61,1, respectivamente (p de tendencia=O,Ol. En las personas con infección antigua, el factor de riesgo asociado fue el antecedente familiar de enfermedad hepática (CSP=3,57 IC 95% 1,19-10,5. Para los infectados (cualquier marcador positivo, el antecedente familiar de enfermedad hepática permanecía como factor de riesgo significativo (CSP=2,44 IC 95% 1,03-5,75. El patrón serológico compatible con infección reciente, en nuestro estudio, se relacionó con la actividad sexual, el efecto de dosis-respuesta hallado, entre mayor número de compañeros e infección, corrobora este hallazgo. Esta relación se diluye cuando se analizan los estadios de infección antigua o cuando se toma a todos como infectados. El uso de los diferentes estadios de infección por VHB como variables dependientes probó ser una manera más eficiente y más específica, desde el

  9. Nuclear energy data 1993

    International Nuclear Information System (INIS)

    1994-01-01

    A questionnaire on Electricity generation, Nuclear Power and Fuel Cycle Data is distributed annually to OECD Member countries. In the questionnaire of January 1993, countries were asked to provide historical data for 1991 and 1992 and most likely projections up to the year 2010. The replies to the questionnaire or the results of the discussions between national correspondents and the Secretariat are presented in this Booklet. The Secretariat has, in some cases, referred to IEA's electricity related data and IAEA's nuclear plant data. Where data were still unavailable, the Secretariat made estimates based on information from other sources. The total capacity of those plants connected to the grid, under construction and firmly committed in 1992 was 289.3 GWe but, based both on questionnaire replies and Secretariat estimates, is expected to rise to 318.0 GWe in 2010 despite an allowance of 20.2 GWe to be taken out of service. The electricity generation and production data for fuel cycle services refer to these facilities located within the country, and thus exclude imports. The fuel cycle requirements, however, refer to the amounts of fuel cycle materials and services necessary for national nuclear programmes. 11 tabs., 6 figs

  10. Development of a System-Wide Predator Control Program: Stepwise Implementation of a Predation Index, Predator Control Fisheries, and Evaluation Plan in the Columbia River Basin; Northern Pikeminnow Management Program, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Porter, Russell G.; Winther, Eric C.; Fox, Lyle G.

    2004-01-01

    This report presents results for year twelve in a basin-wide program to harvest northern pikeminnow1 (Ptychocheilus oregonensis). This program was started in an effort to reduce predation by northern pikeminnow on juvenile salmonids during their emigration from natal streams to the ocean. Earlier work in the Columbia River Basin suggested predation by northern pikeminnow on juvenile salmonids might account for most of the 10-20% mortality juvenile salmonids experience in each of eight Columbia River and Snake River reservoirs. Modeling simulations based on work in John Day Reservoir from 1982 through 1988 indicated that, if predator-size northern pikeminnow were exploited at a 10-20% rate, the resulting restructuring of their population could reduce their predation on juvenile salmonids by 50%. To test this hypothesis, we implemented a sport-reward angling fishery and a commercial longline fishery in the John Day Pool in 1990. We also conducted an angling fishery in areas inaccessible to the public at four dams on the mainstem Columbia River and at Ice Harbor Dam on the Snake River. Based on the success of these limited efforts, we implemented three test fisheries on a system-wide scale in 1991--a tribal longline fishery above Bonneville Dam, a sport-reward fishery, and a dam-angling fishery. Low catch of target fish and high cost of implementation resulted in discontinuation of the tribal longline fishery. However, the sport-reward and dam-angling fisheries were continued in 1992 and 1993. In 1992, we investigated the feasibility of implementing a commercial longline fishery in the Columbia River below Bonneville Dam and found that implementation of this fishery was also infeasible. Estimates of combined annual exploitation rates resulting from the sport-reward and damangling fisheries remained at the low end of our target range of 10-20%. This suggested the need for additional effective harvest techniques. During 1991 and 1992, we developed and tested a modified

  11. Natural gas imports and exports; Fourth quarterly report, 1993

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-31

    The Office of Fuels Programs prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports with the OFP. This report is for the fourth quarter of 1993 (October--December). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the 5 most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past 12 months. Attachment C shows volume and price information for gas imported on a short-term basis. Attachment D shows the gas exported on a short-term basis to Canada and Mexico. During 1993, data indicates gas imports grew by about 10 percent over the 1992 level (2328 vs. 2122 Bcf), with Canadian and Algerian imports increasing by 8 and 82 percent, respectively. During the same time period, exports declined by 41 percent (144 vs. 243 Bcf). Exports to Canada decreased 47 percent from the 1992 level (50 vs. 95 Bcf) and exports to Mexico decreased by 60 percent (38 vs. 95 Bcf).

  12. Annual report and accounts 1992-93

    International Nuclear Information System (INIS)

    1993-07-01

    Scottish Nuclear Limited is Scotland's nuclear power generating company. The Annual Report and Accounts for 1992-1993 are presented. The Company is owned by the Secretary of State for Scotland and supplies all its electricity to Scottish Power (74.9%) and Scottish Hydro-Electric (25.1%). It produces almost half of Scotland's electricity requirements. The Company owns and operates the Advanced Gas-Cooled Reactor (AGR) nuclear power stations at Hunterston on the Firth of Clyde and at Torness on the East Coast of Scotland. It is also responsible for the decommissioning of the magnox nuclear power station, Hunterston A. (Author)

  13. Dam Safety Concepts

    NARCIS (Netherlands)

    Duricic, J.

    2014-01-01

    The majority of dams constructed in the world are dams that can be categorized as embankment dams. Throughout history we can point to many failures of dams, and embankment dams in particular. Nowadays it is clear that the goal to construct stable dams has not been achieved, even with advanced

  14. Presentations from the 1992 Coal Mining Impoundment Informational Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    On May 20 and 21, 1992, the MSHA Coal Mining Impoundment Informational Meeting was held at the National Mine Health and Safety Academy in Beckley, West Virginia. Fifteen presentations were given on key issues involved in the design and construction of dams associated with coal mining. The attendees were told that to improve the consistency among the plan reviewers, engineers from the Denver and Pittsburgh Technical Support Centers meet twice annually to discuss specific technical issues. It was soon discovered that the topics being discussed needed to be shared with anyone involved with coal waste dam design, construction, or inspection. The only way to accomplish that goal was through the issuance of Procedure Instruction Letters. The Letters present a consensus of engineering philosophy that could change over time. They do not present policy or carry the force of law. Currently, thirteen position papers have been disseminated and more will follow as the need arises. The individual paper were not even entered into the database.

  15. Fish Passage Center 2007 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    DeHart, Michele [Fish Passage Center of the Columbia Basin Fish & Wildlife Authority

    2008-11-25

    The January-July runoff volume above the Dalles Dam in 2007 was 89% of the average runoff volume for the 1971-2000 historical record. The April-July runoff volume at Lower Granite Dam was 68% of the 1971-2000 historical record. Over the 79 year historical record from 1929 through 2007, the 2007 January-July runoff volume at the Dalles was the 50th lowest year out of the 79th year record. The January through July runoff volume at Lower Granite was the 65th lowest runoff year out of 79 on record. This year can be characterized by steadily decreasing snowpack which was below average in the Columbia Basin by the end of April. The combination of runoff volume, decreasing snowpack and reservoir operations resulted in spring migration flows at McNary Dam averaging 239 Kcfs, slightly above the Biological Opinion flow objective of 237 Kcfs. However the spring period migration flows in the Snake River averaged 61 Kcfs at Lower Granite Dam, substantially below the Biological Opinion flow objective of 85 Kcfs. Summer migration period Biological Opinion flow objectives averaged 163 Kcfs at McNary Dam, substantially below the summer flow objective of 200 Kcfs. Summer migration period flows in the Snake River at Lower Granite Dam averaged 29 Kcfs, also substantially below the Biological Opinion flow objective of 50 Kcfs. Overall spring migrants in the Columbia River experienced better migration flows than spring migrants in the Snake River reach. Summer migration flow objectives were not achieved in either the Columbia or Snake rivers. The 2007 FCRPS Operations Agreement represents an expanded and improved spill program that goes beyond the measures contained in the 2004 Biological Opinion. During the spring period, spill now occurs for twenty-four hours per day at all projects, except for John Day Dam where the daily program remains at 12 hours. A summer spill program provides spill at all the fish transportation collector projects (Lower Granite, Little Goose, Lower Monumental

  16. Canadian capital spending to slip 4.7% in 1993

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    Total capital and exploration spending by the Canadian petroleum industry is estimated at $6.579 billion in 1993, a drop of 4.7% from estimated 1992 outlays. Last year Canadian capital spending of $6.9 billion represented a drop of 8.9% from 1991 outlays, according to an Oil and Gas Journal survey. All survey related spending estimates in this paper are in U.S. dollars. All individual company spending estimates are in Canadian dollars

  17. Annual review 1992-93

    International Nuclear Information System (INIS)

    1993-06-01

    AEA Technology, the trading name of the United Kingdom Atomic Energy Authority, has evolved from its main mission to develop nuclear technology and its activities now extend over a wide range. Work is done in energy-related technologies, in safety and reliability, in environmental protection, and in applying technology to manufacturing and process industries. During 1992-93 AEA Technology has continued its development as a high quality scientific and engineering services business. Despite difficult trading conditions, steady progress has continued towards establishing AEA as a commercially robust and profitable international business. A decrease in turnover from Pound 425M in 1991-92 to Pound 415M in 1993 is reported and a decrease in operating profit from Pound 33M to Pound 23M. Sales to United Kingdom Nuclear markets have continued to decrease. The Government's decision to cease virtually all investment in fast reactor R and D at the end of March 1993 is particularly disappointing and will have an impact on the 1993-94 turnover. More positively, many major contracts have been completed and new business has been won both in the nuclear and non-nuclear sectors of the business. Examples of these are given in the report. Two particular aspects of business strategy are emphasized. The first is the diversification of the customer base. This is continuing and is exemplified by the growth in turnover by the industrial business group from Pound 105M to Pound 121M over the year. A second key component of strategy is the forming of commercial partnerships with industry via joint ventures. (UK)

  18. Naval Petroleum and Oil Shale Reserves. Annual report of operations, Fiscal year 1993

    International Nuclear Information System (INIS)

    1993-01-01

    During fiscal year 1993, the reserves generated $440 million in revenues, a $33 million decrease from the fiscal year 1992 revenues, primarily due to significant decreases in oil and natural gas prices. Total costs were $207 million, resulting in net cash flow of $233 million, compared with $273 million in fiscal year 1992. From 1976 through fiscal year 1993, the Naval Petroleum and Oil Shale Reserves generated $15.7 billion in revenues for the US Treasury, with expenses of $2.9 billion. The net revenues of $12.8 billion represent a return on costs of 441 percent. See figures 2, 3, and 4. In fiscal year 1993, production at the Naval Petroleum and Oil Shale Reserves at maximum efficient rates yielded 25 million barrels of crude oil, 123 billion cubic feet of natural gas, and 158 million gallons of natural gas liquids. The Naval Petroleum and Oil Shale Reserves has embarked on an effort to identify additional hydrocarbon resources on the reserves for future production. In 1993, in cooperation with the US Geological Survey, the Department initiated a project to assess the oil and gas potential of the program's oil shale reserves, which remain largely unexplored. These reserves, which total a land area of more than 145,000 acres and are located in Colorado and Utah, are favorably situated in oil and gas producing regions and are likely to contain significant hydrocarbon deposits. Alternatively the producing assets may be sold or leased if that will produce the most value. This task will continue through the first quarter of fiscal year 1994

  19. FY 1992 revised task plans for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Shipler, D.B.

    1992-04-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to populations and individuals. The primary objectives of work to be performed in FY 1992 is to determine the appropriate scope (space, time, and radionuclides, pathways and individuals/population groups) and accuracy (level of uncertainty in dose estimates) for the project. Another objective is to use a refined computer model to estimate Native American tribal doses and individual doses for the Hanford Thyroid Disease Study (HTDS). Project scope and accuracy requirements defined in FY 1992 can translated into model and data requirements that must be satisfied during FY 1993

  20. Joint Force Quarterly. Number 3, Winter 1993-94

    Science.gov (United States)

    1994-01-01

    Winter 1993–94 This article is based on the winning entry in the 1992 LtCol Richard Higgins, USMC, memorial essay contest sponsored by the National War...TRANSCOM pledges to develop a new system that lives up to Winston Churchill’s dictum: “Victory is the beautiful bright coloured flower. Transport is...fighter wings 7 Reserve fighter wings 7 Reserve fighter wings 10 Reserve fighter wings Force Enchancements 1803 Ltrs & JW Rev 3/27/04 7:31 AM Page 107

  1. 49th report of the Arbeitsgemeinschaft Rhein-Wasserwerke e.V.. Annual report 1992

    International Nuclear Information System (INIS)

    1992-01-01

    The annual report of the Arbeitsgemeinschaft Rhein-Wasserwerke (ARW) discusses the following subjects: (1) ARW report on water quality; (2) the problem of herbicides and pesticides; (3) Duesseldorf-Flehe Rhine river monitoring station - construction and performance; (4) observations concerning the aerobic degradation capacity of the river banks as a functional of the seasonal temperature variations of the Rhine; (5) results of Rhine water analyses of GEW-Werke Koeln AG in 1992; (6) statistical methods of generating groundwater levels in ground water aquifers under the influence of outfall ditches. The appendix contains the analyses of the year 1992, the data acquired by GEW-Werke Koeln AG for 1992, the 1993 monitoring programme, and a survey of the organisational structure of the Arbeitsgemeinschaft Rhein-Wasserwerke e.V. (orig./BRR) [de

  2. Dam Break Analysis of Embankment Dams Considering Breach Characteristics

    Directory of Open Access Journals (Sweden)

    Abolfazl Shamsaei

    2004-05-01

    Full Text Available The study of dam's break, needs the definition of various parameters such as the break cause, its type, its dimension and the duration of breach development. The precise forecast for different aspects of the breach is one of the most important factors for analyzing it in embankment dam. The characteristics of the breach and determination of their vulnerability has the most effect on the waves resulting from dam break. Investigating, about the parameters of the breach in "Silveh" earth dam have been determined using the suitable model. In Silve dam a trapezoid breach with side slope z=0.01m and the average base line b=80m was computed. The duration of the breaches development is 1.9 hour. Regarding the above results and the application of DAM Break software the consequences of the probable break of the dam was determined. The analysis of the results of water covering of the city of Piranshahr located 12km from silve dam confirms that in 3 hours the water will reach the height (level of 1425 meters.

  3. Water-resources activities, North Dakota District, Fiscal Year 1992

    Science.gov (United States)

    Martin, Cathy R.

    1993-01-01

    The mission of the U.S. Geological Survey, Water Resources Division, is to provide the hydrologic information and understanding needed for the optimum utilization and management of the Nation's water resources for the overall benefit of the people of the United States. This report describes water-resources activities of the Water Resources Division in North Dakota in fiscal year 1992. Information on each project includes objectives, approach, progress, plans for fiscal year 1993, and completed and planned report products.

  4. Natural gas market assessment. Natural gas supply, western Canada: Recent developments (1982-1992), [and] short-term deliverability outlook (1993-1996)

    International Nuclear Information System (INIS)

    1993-11-01

    A review is presented of the evolution of gas supply from western Canada over the last ten years and a short-term forecast of gas deliverability. To illustrate the changed supply conditions, selected trends and market developments are summarized, including trends in excess deliverability, changes in reserves, the regional distribution of cumulative production, the pace of tieing-in of previously discovered pools for production, the expansion in deliverability from gas storage reservoirs, and recent increases in drilling activity. On the basis of analyses and observations, it is concluded that estimated productive capacity is likely to exceed pipeline capacity on a peak-day basis by a narrow margin over 1993-96. Increasing deliverability from gas storage reservoirs located in the producing provinces is an important factor in handling peak day requirements. From time to time, high demand due to extreme weather conditions could result in pronounced tightness and price fluctuations similar to those seen in winter 1992/93. A strong economic recovery could also result in market tightness, depending on the speed and size of supply response. The growing estimates of resource potential in the western Canada sedimentary basin provide an encouraging indication of the availability of future supply. 29 figs., 3 tabs

  5. NRC inventory of dams

    International Nuclear Information System (INIS)

    Lear, G.E.; Thompson, O.O.

    1983-01-01

    The NRC Inventory of Dams has been prepared as required by the charter of the NRC Dam Safety Officer. The inventory lists 51 dams associated with nuclear power plant sites and 14 uranium mill tailings dams (licensed by NRC) in the US as of February 1, 1982. Of the 85 listed nuclear power plants (148 units), 26 plants obtain cooling water from impoundments formed by dams. The 51 dams associated with the plants are: located on a plant site (29 dams at 15 plant sites); located off site but provide plant cooling water (18 dams at 11 additional plant sites); and located upstream from a plant (4 dams) - they have been identified as dams whose failure, and ensuing plant flooding, could result in a radiological risk to the public health and safety. The dams that might be considered NRC's responsibility in terms of the federal dam safety program are identified. This group of dams (20 on nuclear power plant sites and 14 uranium mill tailings dams) was obtained by eliminating dams that do not pose a flooding hazard (e.g., submerged dams) and dams that are regulated by another federal agency. The report includes the principal design features of all dams and related useful information

  6. International Conference on Numerical Ship Hydrodynamics (6th), Held in Iowa City, Iowa on 2-5 August 1993,

    Science.gov (United States)

    1994-01-01

    effects of flare and the Maskew (1992) and the companion paper by coupling between the steady and unsteady flow Nakos, Kring and Sclavounos (1993), which... companion experimental study of tip vor- interaction between the wake and the tip vortex tex cavitation (Maines and Arndt, 1993a, b). is an important...Japan Bai, Kwang-Jun Seoul National University Korea Bardisa, Enrique Ingenieria de Sistemas de Informacion, S.L. Spain Beale, James General Dynamics

  7. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1993 Quality Program status report

    International Nuclear Information System (INIS)

    Boliver, S.L.

    1995-05-01

    This status report is for calendar year 1993. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory (Los Alamos) Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, we establish a baseline that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify long term trends and to evaluate improvements. This is the third annual status report (Bolivar, 1992; Bolivar, 1994). This report is divided into two primary sections: Program Activities and Trend Analysis. Under Program Activities, programmatic issues occurring in 1993 are discussed. The goals for 1993 are also listed, followed by a discussion of their status. Lastly, goals for 1994 are identified. The Trend Analysis section is a summary of 1993 quarterly trend reports and provides a good overview of the quality assurance issues of the Los Alamos YMP

  8. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1993 Quality Program status report

    Energy Technology Data Exchange (ETDEWEB)

    Bolivar, S.L.

    1995-05-01

    This status report is for calendar year 1993. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory (Los Alamos) Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, we establish a baseline that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify long term trends and to evaluate improvements. This is the third annual status report (Bolivar, 1992; Bolivar, 1994). This report is divided into two primary sections: Program Activities and Trend Analysis. Under Program Activities, programmatic issues occurring in 1993 are discussed. The goals for 1993 are also listed, followed by a discussion of their status. Lastly, goals for 1994 are identified. The Trend Analysis section is a summary of 1993 quarterly trend reports and provides a good overview of the quality assurance issues of the Los Alamos YMP.

  9. 8. annual report of RADMIL 1992/93

    International Nuclear Information System (INIS)

    1993-01-01

    The eighth RADMIL (Radioactivity monitoring in Lancashire) annual report covers the period 1992-1993. It is self-contained, with data on monitoring systems held in the text rather than referenced. It summarizes the UK radiological protection system and the standards against which public exposure is assessed. It uses the data from RADMIL monitoring to indicate doses to Lancastrians from all sources (environmental gamma dose rate, atmospheric particulates, seafood and seaweed monitoring, other food monitoring, intertidal sediment and house, and external dust) and discusses risk and estimates doses to specific groups in relation to occupations and personal habits. (UK)

  10. The MAGnet Newsletter on Mixed-Age Grouping in Preschool and Elementary Settings, 1992-1997.

    Science.gov (United States)

    McClellan, Diane, Ed.

    1997-01-01

    These 11 newsletter issues provide a forum for discussion and exchange of ideas regarding mixed-age grouping in preschool and elementary schools. The October 1992 issue focuses on the mixed-age approach as an educational innovation, defines relevant terms, and presents advice from Oregon teachers on teaching mixed-age groups. The March 1993 issue…

  11. Dams

    Data.gov (United States)

    Vermont Center for Geographic Information — This dataset �is generated from from the Vermont Dam Inventory (VDI). The VDI is managed by the VT DEC's Dam Safety and Hydrology Section and contains information...

  12. Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Buettner, Edwin W.; Putnam, Scott A. [Idaho Department of Fish and Game

    2009-02-18

    increase in hatchery Chinook catch in 2002 was due to a 3.1 fold increase in hatchery production and differences in flow between years. Changes in hatchery and wild steelhead catch are probably due to differences in flow between years. Travel time (d) and migration rate (km/d) through Lower Granite Reservoir for PIT-tagged Chinook salmon and steelhead trout marked at the Snake River trap were affected by discharge. Statistical analysis of 2002 data detected a relation between migration rate and discharge for hatchery and wild Chinook salmon. For hatchery and wild Chinook salmon there was a 4.7-fold and a 3.7-fold increase in migration rate, respectively, between 50 and 100 kcfs. For steelhead trout tagged at the Snake River trap, statistical analysis detected a significant relation between migration rate and Lower Granite Reservoir inflow discharge. For hatchery and wild steelhead trout, there was a 1.8-fold and a 1.7-fold increase in migration rate, respectively, between 50 and 100 kcfs. Travel time and migration rate to Lower Granite Dam for fish marked at the Salmon River trap were calculated. Statistical analysis of the 2002 data detected a significant relation between migration rate and Lower Granite Reservoir inflow discharge for wild Chinook salmon and hatchery steelhead trout. The analysis was unable to detect a relation between migration rate and discharge for hatchery Chinook salmon. The lack of a detectable relation was probably a result of the migration rate data being spread over a very narrow range of discharge. Not enough data were available to perform the analysis for wild steelhead trout. Migration rate increased 4.3-fold for wild Chinook salmon and 2.2-fold for hatchery steelhead between 50 kcfs and 100 kcfs. Fish tagged with passive integrated transponder (PIT) tags at the Snake River trap were interrogated at four dams with PIT tag detection systems (Lower Granite, Little Goose, Lower Monumental, and McNary dams). Because of the addition of the fourth

  13. Natural gas: Imports and exports third quarter report 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    The Office of Fuels Programs prepares quarterly reports summarizing the data provided by companies with authorizations to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports with the OFP. This report is for the third quarter of 1993 (July--September). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past twelve months (October 1992--September 1993). Attachment C shows volume and price information pertaining to gas imported on a short-term or spot market basis. Attachment D shows the gas exported on a short-term or spot market basis to Canada and Mexico.

  14. The impact of HMO penetration on the rate of hospital cost inflation, 1985-1993.

    Science.gov (United States)

    Gaskin, D J; Hadley, J

    1997-01-01

    This paper provides evidence that growth in health maintenance organization (HMO) enrollment slows hospital cost inflation. During the period 1985-1993, hospitals in areas with high rates of HMO penetration and growth had a slower rate of growth in expenses (8.3%) than hospitals in low penetration areas (11.2%). From 1992-1993, HMO growth lowered the rate of hospital cost inflation by .34 to 3.40 percentage points, depending on the base-year level and the annual change in HMO penetration. Declines in Medicare Prospective Payment System (PPS) margins also lowered hospital cost inflation; over the time period, annual hospital cost inflation was reduced by .38 percentage points. The estimates imply that the cumulative effect of HMO growth on hospital costs has been a $56.2 billion reduction (in 1993 dollars).

  15. Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2

    International Nuclear Information System (INIS)

    1995-09-01

    This report supplements the Safety Evaluation Report (SER), NUREG-0847 (June 1982), Supplement No. 1 (September 1982), Supplement No. 2 (January 1984), Supplement No. 3 (January 1985). Supplement No. 4 (March 1985), Supplement No. 5 (November 1990), Supplement No. 6 (April 1991), Supplement No. 7 (September 1991), Supplement No. 8 (January 1992). Supplement No. 9 (June 1992), Supplement No. 10 (October 1992), Supplement No. 11 (April 1993), Supplement No. 12 (October 1993). Supplement No. 13 (April 1994), Supplement No. 14 (December 1994), and Supplement No. 15 (June 1995) issued by the Office of Nuclear Reactor Regulation of the U.S. Nuclear Regulatory Commission with respect to the application filed by the Tennessee Valley Authority, as applicant and owner, for licenses to operate the Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos, 50-390 and 50-391). The facility is located in Rhea County, Tennessee, near the Watts Bar Dam on the Tennessee River. This supplement provides recent information regarding resolution of some of the outstanding and confirmatory items, and proposed license conditions identified in the SER

  16. Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). Supplement No. 15

    International Nuclear Information System (INIS)

    Tam, P.S.

    1995-06-01

    This report supplements the Safety Evaluation Report (SER), NUREG-0847 (June 1982), Supplement No. 1 (September 1982), Supplement No. 2 (January 1984), Supplement No. 3 (January 1985), Supplement No. 4 (March 1985), Supplement No. 5 (November 1990), Supplement No. 6 (April 1991), Supplement No. 7 (September 1991), Supplement No. 8 (January 1992), Supplement No. 9 (June 1992), Supplement No. 10 (October 1992), Supplement No. 11 (April 1993), Supplement No. 12 (October 1993), Supplement No. 13 (April 1994), and Supplement No. 14 (December 1994) issued by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by the Tennessee Valley Authority, as applicant and owner, for licenses to operate the Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). The facility is located in Rhea County, Tennessee, near the Watts Bar Dam on the Tennessee River. This supplement provides recent information regarding resolution of some of the outstanding and confirmatory items, and proposed license conditions identified in the SER

  17. Hydrometric stations of Comacchio wetland: Hydrological data from January 1 1992 until December 31 1993

    International Nuclear Information System (INIS)

    Casolari, A.; Cremona, G.; Valgimigli, L.; Vincenzi, D.

    1995-07-01

    This report presents the results of the first processing of the data recorded hourly in 1992-93 by ten hydrometric stations of the Comacchio wetland (Italy) within the ENEA (Italian Agency for New Technologies, Energy and the Environment) project for the integrated study of it. It can be deduced that the Comacchio wetland hydraulic management calendar for this period is similar to the ones deduced from the processing of the data registrated in the previous years. On this basis the water budget on one year and the hydrodynamic characteristics of the wetland deduced from the data registrated until march 1992 have remained basically the same also in the monitoring period considered here

  18. Japan`s largest composition dam, aiming for harmony with nature. Chubetsu dam; Shizen tono chowa wo mezasu, Nippon ichi no fukugo dam. Chubetsu dam

    Energy Technology Data Exchange (ETDEWEB)

    Mizushima, T. [Hokkaido Development Bureau, Hokkaido Development Agency, Sapporo (Japan)

    1994-08-15

    This paper introduces Chubetsu Dam planned with a large-scale embankment having a river bed width of 600 m. Chubetsu Dam is being constructed with such objectives as flood control of Ishikari River, river flow rate maintenance, drinking water supply, irrigation water supply and power generation. The dam site is a gravel bed having a river bed width of 600 m and a maximum foundation rock thickness of 40 m, requiring evaluations as a dam foundation and discussions of water shielding methods. As a result of discussions at the Chubetsu Dam technical discussion committee, the dam type is decided to be a composition dam consisting of a gravity type concrete dam on the left river side and a central core type fill dam using a part of the gravel bed as the foundation on the right river side. A continuous underground wall system is planned to be used for shielding water in the gravel foundation. In discussing the anti-seismic properties, analyses for bank construction and water filling to derive stress and deformation conditions prior to an earthquake and a time-history response analysis to derive conditional changes during the earthquake are performed. According to the results thereof, evaluations are given on the safety by compounding the stress and the acceleration. In plans to improve the surrounding areas, an area will be provided upstream the reservoir where the water level is kept constant to serve as a bird sanctuary. 7 figs.

  19. IMPACT OF THE ATATÜRK DAM LAKE ON AGRO-METEOROLOGICAL ASPECTS OF THE SOUTHEASTERN ANATOLIA REGION USING REMOTE SENSING AND GIS ANALYSIS

    Directory of Open Access Journals (Sweden)

    O. Ozcan

    2012-07-01

    Full Text Available The Atatürk Dam is the fourth largest clay-cored rock fill dam in the world. It was constructed on the Euphrates River located in semi-arid Southeastern Turkey in the 1980s as the central component of a large-scale regional development project for the Southeastern Anatolia region (referred to as GAP. The construction began in 1983 and was completed in 1990. The dam and the hydroelectric power plant, which went into service after filling up the reservoir was accomplished in 1992. The Atatürk Dam, which has a height of 169 m, a total storage capacity of 48.7 million m3, and a surface area of about 817 km2 plays an important role in the development of Turkey's energy and agriculture sectors. In this study, the spatial and temporal impacts of the Atatürk Dam on agro-meteorological aspects of the Southeastern Anatolia region have been investigated. Change detection and environmental impacts due to water-reserve changes in Atatürk Dam Lake have been determined and evaluated using multi-temporal Landsat satellite imageries and meteorological datasets within a period of 1984 to 2011. These time series have been evaluated for three time periods. Dam construction period constitutes the first part of the study. Land cover/use changes especially on agricultural fields under the Atatürk Dam Lake and its vicinity have been identified between the periods of 1984 to 1992. The second period comprises the 10-year period after the completion of filling up the reservoir in 1992. At this period, Landsat and meteorological time-series analyses are examined to assess the impact of the Atatürk Dam Lake on selected irrigated agricultural areas. For the last 9-year period from 2002 to 2011, the relationships between seasonal water-reserve changes and irrigated plains under changing climatic factors primarily driving vegetation activity (monthly, seasonal, and annual fluctuations of rainfall rate, air temperature, humidity on the watershed have been investigated

  20. Safety Aspects of Sustainable Storage Dams and Earthquake Safety of Existing Dams

    Directory of Open Access Journals (Sweden)

    Martin Wieland

    2016-09-01

    Full Text Available The basic element in any sustainable dam project is safety, which includes the following safety elements: ① structural safety, ② dam safety monitoring, ③ operational safety and maintenance, and ④ emergency planning. Long-term safety primarily includes the analysis of all hazards affecting the project; that is, hazards from the natural environment, hazards from the man-made environment, and project-specific and site-specific hazards. The special features of the seismic safety of dams are discussed. Large dams were the first structures to be systematically designed against earthquakes, starting in the 1930s. However, the seismic safety of older dams is unknown, as most were designed using seismic design criteria and methods of dynamic analysis that are considered obsolete today. Therefore, we need to reevaluate the seismic safety of existing dams based on current state-of-the-art practices and rehabilitate deficient dams. For large dams, a site-specific seismic hazard analysis is usually recommended. Today, large dams and the safety-relevant elements used for controlling the reservoir after a strong earthquake must be able to withstand the ground motions of a safety evaluation earthquake. The ground motion parameters can be determined either by a probabilistic or a deterministic seismic hazard analysis. During strong earthquakes, inelastic deformations may occur in a dam; therefore, the seismic analysis has to be carried out in the time domain. Furthermore, earthquakes create multiple seismic hazards for dams such as ground shaking, fault movements, mass movements, and others. The ground motions needed by the dam engineer are not real earthquake ground motions but models of the ground motion, which allow the safe design of dams. It must also be kept in mind that dam safety evaluations must be carried out several times during the long life of large storage dams. These features are discussed in this paper.

  1. Damming evidence : Canada and the World Commission on Dams

    Energy Technology Data Exchange (ETDEWEB)

    Vert, P.; Parkinson, B.

    2003-06-01

    Large hydroelectric projects have been met with strong resistance from affected communities, particularly indigenous groups who have been displaced from their flooded communities following the damming of a river. The World Commission on Dams (WCD) was formed in 1998 to review the effectiveness of large dams and develop internationally acceptable guidelines and standards for large dams or hydro energy projects. The Canadian government, through the Canadian International Development Agency, was one of many governments to fund the WCD. However, the authors argue that despite the financial support, the Canadian government was absent from any effort to follow-up on the recommendations of the WCD. The seven strategic priorities in the decision making process include: (1) gaining public acceptance, (2) comprehensive option assessment of water, energy, food and development needs, (3) addressing existing dams to improve the benefits that can be derived from them, (4) sustaining livelihoods, (5) recognizing the entitlements and sharing benefits, (6) ensuring compliance, and (7) sharing rivers for peace, development and security. This report offers a means to assess planned or existing dams and presents a set of guidelines for good practices linked to the seven strategic priorities. Ten case studies from around the world were presented, including the Three Gorges Dam in China. 154 refs., 3 figs., 3 appendices.

  2. Proceedings of the Canadian Dam Association's 2006 annual conference: dams: past, present and future

    International Nuclear Information System (INIS)

    2006-01-01

    This conference addressed particular technical challenges regarding the operation of dams with particular focus on best practices for improving dam management and safety. It featured 4 workshops and a technical program led by experts on dams and tailings facilities that addressed topics such as dam construction, design and rehabilitation; dam management in a hydrological uncertainty context; monitoring, instrumentation and maintenance; dam behaviour; dam safety, dam failure and practical approaches to emergency preparedness planning for dam owners; historical aspects and environmental issues and conflicting water use. Recent developments in dam construction were reviewed along with discharge and debris management, tailings dam issues, asset management, seismic issues, public safety, seepage monitoring, flow control, dam rehabilitation, concrete testing, hydrotechnical issues, risk assessment methodology, and dam safety guidelines for extreme flood analyses and their applications. All 80 presentations from this conference have been catalogued separately for inclusion in this database. refs., tabs., figs

  3. Analysis of the Hydro-Quebec development plan 1992-2010

    International Nuclear Information System (INIS)

    Bernard, J.-T.; Genest-Laplante, E.

    1994-01-01

    In November 1992, the Quebec provincial utility Hydro-Quebec presented its development plan for the 1992-2010 period and shortly thereafter introduced its 1993-1995 energy efficiency commitments. The plan is analyzed using a model that incorporates the main institutional features of electricity price setting. Two scenarios are constructed. The first incorporates Hydro-Quebec's electricity demand forecast and the second allows electricity demand to respond to its price. A comparative analysis shows that electricity demand in the province should increase faster than forecast by Hydro-Quebec until 2010. In fact, demand could exceed the predicted level by ca 16 TWh, or 8.6%. This larger increase is due to a fall in the real price of electricity, itself caused by a government imposed fall in the real unit cost of the utility's operation. This last constraint is the real challenge faced by Hydro-Quebec. 12 refs., 7 tabs

  4. Proceedings of the 2010 Canadian Dam Association's public safety around dams workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    Nearly 30 people have drowned in dam-related incidents over the last 10 years in Canada. The Canadian public is now calling for improved safety guidelines. Public interaction with dams is increasing as a result of interest in extreme sports and perceived rights of access. However, many members of the public are not aware of the dangers posed by dams. This workshop provided a forum to discuss proposals for a draft publication of the Canadian Dam Association (CDA) guidelines for public safety and security around dams. Issues related to current legislation and liability were discussed. Methods of increasing public awareness of the hazards posed by dams included increased signage in dam locations, the use of audible and visual alert systems, and the use of booms and buoys. The responsibilities of dam owners in ensuring the safety of dams were also discussed. The conference featured 5 presentations, of which 2 have been catalogued separately for inclusion in this database. tabs., figs.

  5. Smolt Monitoring Program, Volume II, Migrational Characteristics of Columbia Basin Salmon and Steelhead Trout, 1986 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Fish Passage Center

    1987-02-01

    Smolt Monitoring Program Annual Report, 1986, Volume I, describes the results of travel time monitoring and other migrational characteristics of yearling and sub-yearling chinook salmon (Oncorhynchus tshawytscha), sockeye salmon (Oncorhynchus nerka), and steelhead trout (Salmo gairdneri). This volume presents the data from Fish Passage Center freeze brands used in the analysis of travel time for Lewiston, Lower Granite, Lower Monumental, Rock Island, McNary, and John Day dams. Summary of data collection procedures and explanation of data listings are presented in conjunction with the mark recapture data. Data for marked fish not presented in this report will be provided upon request. Daily catch statistics (by species), flow, and sample parameters for the smolt monitoring sites, Clearwater, Lewiston, Lower Granite, Lower Monumental, Rock Island, McNary, John Day, and Bonneville also will be provided upon request.

  6. The Dams and Monitoring Systems and Case Study: Ataturk and Karakaya Dams

    Science.gov (United States)

    Kalkan, Y.; Bilgi, S.; Gülnerman, A. G.

    2017-12-01

    Dams are among the most important engineering structures used for flood controls, agricultural purposes as well as drinking and hydroelectric power. Especially after the Second World War, developments on the construction technology, increase the construction of larger capacity dams. There are more than 150.000 dams in the world and almost 1000 dams in Turkey, according to international criteria. Although dams provide benefits to humans, they possess structural risks too. To determine the performance of dams on structural safety, assessing the spatial data is very important. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. These physical data are measured and monitored by the instruments and equipment. Dams and their surroundings have to be monitored by using essential methods at periodic time intervals in order to determine the possible changes that may occur over the time. Monitoring programs typically consist of; surveillance or visual observation. These programs on dams provide information for evaluating the dam's performance related to the design intent and expected changes that could affect the safety performance of the dam. Additionally, these programs are used for investigating and evaluating the abnormal or degrading performance where any remedial action is necessary. Geodetic and non-geodetic methods are used for monitoring. Monitoring the performance of the dams is critical for producing and maintaining the safe dams. This study provides some general information on dams and their different monitoring systems by taking into account two different dams and their structural specifications with the required information. The case study in this paper depends on a comparison of the monitoring surveys on Atatürk Dam and Karakaya Dam, which are constructed on Firat River with two different structural

  7. 1992 Annual Capacity Report

    International Nuclear Information System (INIS)

    1993-05-01

    The Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (10 CFR Part 961) requires the Department of Energy (DOE) to issue an Annual Capacity Report (ACR) for planning purposes. This report is the fifth in the series published by DOE. In May 1993, DOE published the 1992 Acceptance Priority Ranking (APR) that established the order in which DOE will allocate projected acceptance capacity. As required by the Standard Contract, the acceptance priority ranking is based on the date the spent nuclear fuel (SNF) was permanently discharged, with the owners of the oldest SNF, on an industry-wide basis, given the highest priority. The 1992 ACR applies the projected waste acceptance rates in Table 2.1 to the 1992 APR, resulting in individual allocations for the owners and generators of the SNF. These allocations are listed in detail in the Appendix, and summarized in Table 3.1. The projected waste acceptance rates for SNF presented in Table 2.1 are nominal and assume a site for a Monitored Retrievable Storage (MRS) facility will be obtained; the facility will initiate operations in 1998; and the statutory linkages between the MRS facility and the repository set forth in the Nuclear Waste Policy Act of 1982, as amended (NWPA), will be modified. During the first ten years following projected commencement of Civilian Radioactive Waste Management System (CRWMS) operation, the total quantity of SNF that could be accepted is projected to be 8,200 metric tons of uranium (MTU). This is consistent with the storage capacity licensing conditions imposed on an MRS facility by the NWPA. The annual acceptance rates provide an approximation of the system throughput and are subject to change as the program progresses

  8. National energy data profile, Austria 1992

    International Nuclear Information System (INIS)

    1993-12-01

    Detail information about the energy consumption, energy demand and supply, general features of energy economy and the analysis of the development of energy economy in Austria in 1992 as well as preliminary data on energy consumption in the first 6 months of 1993 is given. Statistical data about the development of energy demand by sectors, development of total final energy demand by energy carriers (articulated in coal, refined petroleum products, natural gas, other, electricity and heat), development of energy consumption in industry (articulated in coal, refined petroleum products, natural gas, other, electricity and heat) and development of energy consumption of domestic consumers (articulated in coal, refined petroleum products, natural gas, other, electricity and heat) is shown. Graphical data about (1) primary energy supply by source, (2) primary energy, economic activity and electricity, (3) indigenous energy production, (4) conventional energy resources, (5) electricity supply by source, (6) electricity consumption by sector is presented for the years 1970 - 1992. Data about the development and exploitable hydro-power potentials by rivers and the main sources of man-made emissions of air pollutants in Austria 1990 according to the results of the CORINE-inventory are added. (blahsl)

  9. Manitoba oil activity review, 1992

    International Nuclear Information System (INIS)

    1993-04-01

    In an annual survey of Manitoba's petroleum industry, data are presented on oil and natural gas leases and sales, geophysical activity, exploration and drilling activity, production, oil prices and sales value, royalties and taxes, direct revenues from oil exploration and development, reserves, industry expenditures, and oil fields. Throughout the report, explanations are given of the items covered. Descriptions are made of new developments, the oil market, oil policies, incentive programs, and industrial activities. During 1992, 28 wells were drilled, compared to 54 in 1991. Oil production was down ca 8% from 1991 levels, to 656,415 m 3 ; the value of the oil produced decreased 4% to ca $86.3 million; and provincial revenues from the oil industry decreased by 24%. Oil industry expenditures in the province were estimated at $58 million, down 16% from 1991. As of 4 January 1993, there were 11 oil fields and 120 non-confidential oil pools designated in Manitoba. Crude oil prices fluctuated throughout the year. In 1992, Manitoba's average crude oil price was $20.89/bbl, compared with 1991's average of $20.14/bbl. Manitoba Energy and Mines amended the Drilling Incentive Program to provide a 10,000 m 3 holiday volume for horizontal wells. 12 figs., 17 tabs

  10. Center for Volcanic and Tectonic Studies: 1992--1993 annual report

    International Nuclear Information System (INIS)

    1994-01-01

    The annual report of the Center for Volcanic Studies (CVTS) contains a series of papers, reprints and a Master of Science thesis that review the progress made by the CVTS between October 1, 1992 and February 1, 1994. During this period CVTS staff focused on several topics that have direct relevance to volcanic hazards related to the proposed high-level nuclear waste repository at Yucca Mountain, Nevada. These topics include: (1) polygenetic/polycyclic volcanism in Crater Flat, Nevada; (2) the role of the mantle during crustal extension; (3) the detailed geology of Crater Flat, Nevada; (4) Pliocene volcanoes in the Reveille Range, south-central Nevada; (5) estimating the probability of disruption of the proposed repository by volcanic eruptions. This topic is being studied by Dr. C.H. Ho at UNLV. The report contains copies of these individual papers as they were presented in various conference proceedings

  11. The UK oil industry in 1992-93

    International Nuclear Information System (INIS)

    Collins, John

    1993-01-01

    A review is presented of the fortunes of the United Kingdom oil industry for the year 1992-1993. Recent achievements in dealing with competition and growing costs are noted. Relationships between the oil industry and policy makers, both at national and European Community level will need to be based on realistic understanding of the industry and the complex issues it faces. Although the offshore oil and gas industry has enjoyed considerable success since the mid-1960s, recent structural change and market liberalization means that it now faces challenges which require even closer cooperation between government and the industry itself to be achieved. (UK)

  12. Research on Safety Factor of Dam Slope of High Embankment Dam under Seismic Condition

    Directory of Open Access Journals (Sweden)

    Li Bin

    2015-01-01

    Full Text Available With the constant development of construction technology of embankment dam, the constructed embankment dam becomes higher and higher, and the embankment dam with its height over 200m will always adopt the current design criteria of embankment dam only suitable for the construction of embankment dam lower than 200m in height. So the design criteria of high embankment dam shall be improved. We shall calculate the stability and safety factors of dam slope of high embankment dam under different dam height, slope ratio and different seismic intensity based on ratio of safety margin, and clarify the change rules of stability and safety factors of dam slope of high embankment dam with its height over 200m. We calculate the ratio of safety margin of traditional and reliable method by taking the stable, allowable and reliability index 4.2 of dam slope of high embankment dam with its height over 200m as the standard value, and conduct linear regression for both. As a result, the conditions, where 1.3 is considered as the stability and safety factors of dam slope of high embankment dam with its height over 200m under seismic condition and 4.2 as the allowable and reliability index, are under the same risk control level.

  13. Snake River Sockeye salmon habitat and limnological research. Annual report 1993

    International Nuclear Information System (INIS)

    Teuscher, D.; Taki, D.; Wurtsbaugh, W.A.; Luecke, C.; Budy, P.; Gross, H.P.; Steinhart, G.

    1994-06-01

    In 1993 we completed research directed at characterizing the 0. nerka populations and their interactions with other fish species in five Sawtooth Valley Lakes. Historically, Redfish, Alturas, Pettit, Stanley, and Yellow Belly Lakes provided Snake River sockeye (Oncorhynchus nerka) spawning and rearing habitat (Evermann 1896; Bjornn 1968). All of these lakes, with exception to Yellow Belly, still support 0. nerka populations. In chapter 1 of this report we describe 0. nerka spawning locations and densities, tributary fry recruitment, and results from a habitat survey completed in Redfish Lake. In chapter 2 we review foraging habits of fish that may compete with, or prey on 0. nerka populations. Kokanee fry emergence from Fishhook Creek in 1993 was 160,000. Fry emergence increased nearly five fold over that reported in 1992. Interestingly, spawning densities in 1991 and 1992 were somewhat similar (7,200 and 9,600, respectively). Discharge from Fishhook Creek was markedly higher in 1992 and may have caused the better egg to fry survival. 0. nerka spawning on sockeye beach appeared limited (< 100 fish). Additionally, sockeye beach was the only area that wild or residual sockeye were located. Of 24 adult sockeye released into Redfish Lake, from the brood stock program, two were found spawning in the south end of the lake. Results from the habitat survey indicated that substrate composition on sockeye beach is poor. 0. nerka diet patterns shifted from chironomid prey in June zooplankton prey in September. Rainbow trout consumed a broadrange of prey, with few instances of significant diet overlap with 0. nerka. Northern squawfish, bull char, and lake trout preyed on 0. nerka. Utilization of 0. nerka by predators was greatest in September

  14. U.S. Postal Service radon assessment and mitigation program. Progress report, September 1993--November 1994

    Energy Technology Data Exchange (ETDEWEB)

    Velazquez, L.E.; Petty, J.L. Jr.

    1994-12-31

    In 1992, the US Postal Service (USPS) entered into an Interagency Agreement with the Department of Energy (DOE) whereby DOE would provide technical assistance in support of the USPS Radon Assessment and Mitigation Program. To aid in this effort, DOE tasked the Hazardous Waste Remedial Actions Program (HAZWRAP), which is managed by Martin Marietta Energy Systems, Inc., for DOE under contract AC05-84OR21400. Since that time, HAZWRAP has developed and finalized the sampling protocol, mitigation diagnostic protocol, and the quality assurance and quality control procedures. These procedures were validated during the Protocol Validation (1992-1993) and Pilot Study (1993-1994) phases of the program. To date, HAZWRAP has performed approximately 16,000 radon measurements in 250 USPS buildings. Mitigation diagnostics have been performed in 27 buildings. Thus far, 13% of the measurements have been above the Environmental Protection Agency action level of 4 pCi/L. This report summarizes the pilot program radon testing data and mitigation diagnostic data for 22 sites and contains recommendations for mitigation diagnostics.

  15. U.S. Postal Service radon assessment and mitigation program. Progress report, September 1993--November 1994

    International Nuclear Information System (INIS)

    Velazquez, L.E.; Petty, J.L. Jr.

    1994-01-01

    In 1992, the US Postal Service (USPS) entered into an Interagency Agreement with the Department of Energy (DOE) whereby DOE would provide technical assistance in support of the USPS Radon Assessment and Mitigation Program. To aid in this effort, DOE tasked the Hazardous Waste Remedial Actions Program (HAZWRAP), which is managed by Martin Marietta Energy Systems, Inc., for DOE under contract AC05-84OR21400. Since that time, HAZWRAP has developed and finalized the sampling protocol, mitigation diagnostic protocol, and the quality assurance and quality control procedures. These procedures were validated during the Protocol Validation (1992-1993) and Pilot Study (1993-1994) phases of the program. To date, HAZWRAP has performed approximately 16,000 radon measurements in 250 USPS buildings. Mitigation diagnostics have been performed in 27 buildings. Thus far, 13% of the measurements have been above the Environmental Protection Agency action level of 4 pCi/L. This report summarizes the pilot program radon testing data and mitigation diagnostic data for 22 sites and contains recommendations for mitigation diagnostics

  16. Commodity chemical growth to slow in 1993

    International Nuclear Information System (INIS)

    Plishner, E.S.

    1992-01-01

    In their latest chemical outlook, DRI/McGraw-Hill economists characterize 1992 as a peak year for U.S. commodity chemical demand growth, at 4.2%, tapering off to a compound 2.2% between 1993 and 1995. Just as operating rates begin to reach higher levels in 1995, however, DRI forecasts slowing GNP growth. DRI's Ramunas J. Svarcas expects a decline in exports. Those plastics promising the rosiest consumption outlook include melamine-formaldehyde resin, up 9.9% in 1992, from 155 million lbs in 1991, and projected to grow 8.6%/year through 1995; styrene acrylonitrile resin, up 23% this year, from 58 million lbs last year, and growing 8.2%/year through 1995; and unsaturated polyester, up 11.7% this year, from 1.07 billion lbs in 1991, and increasing at 6.5%/year. Methanol is a bright spot, with consumption growing 4.7%, from 11.2 billion lbs in 1991 and 12%/year thereafter. Ortho-xylene managed an impressive 21% rebound from a depressed 1991 level of 783 million lbs, and is expected to continue its recovery at 7.7%/year

  17. Dams designed to fail

    Energy Technology Data Exchange (ETDEWEB)

    Penman, A. [Geotechnical Engineering Consultants, Harpenden (United Kingdom)

    2004-09-01

    New developments in geotechnical engineering have led to methods for designing and constructing safe embankment dams. Failed dams can be categorized as those designed to fail, and those that have failed unexpectedly. This presentation outlined 3 dam failures: the 61 m high Malpasset Dam in France in 1959 which killed 421; the 71 m high Baldwin Hills Dam in the United States in 1963 which killed 5; and, the Vajont Dam in Italy in 1963 which killed 2,600 people. Following these incidents, the International Commission for Large Dams (ICOLD) reviewed regulations on reservoir safety. The 3 dams were found to have inadequate spillways and their failures were due to faults in their design. Fuse plug spillways, which address this problem, are designed to fail if an existing spillway proves inadequate. They allow additional discharge to prevent overtopping of the embankment dam. This solution can only be used if there is an adjacent valley to take the additional discharge. Examples of fuse gates were presented along with their effect on dam safety. A research program is currently underway in Norway in which high embankment dams are being studied for overtopping failure and failure due to internal erosion. Internal erosion has been the main reason why dams have failed unexpectedly. To prevent failures, designers suggested the use of a clay blanket placed under the upstream shoulder. However, for dams with soft clay cores, these underblankets could provide a route for a slip surface and that could lead to failure of the upstream shoulder. It was concluded that a safe arrangement for embankment dams includes the use of tipping gates or overturning gates which always fail at a required flood water level. Many have been installed in old and new dams around the world. 14 refs., 19 figs.

  18. Status and Monitoring of Natural and Supplemented Chinook Salmon in Johnson Creek, Idaho, 2006-2007 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rabe, Craig D.; Nelson, Douglas D. [Nez Perce Tribe

    2008-11-17

    were 120,415 HOR supplementation smolts released into Johnson Creek during the week of March 12, 2007. Life stage-specific juvenile survival from Johnson Creek to Lower Granite and McNary dams was calculated for brood year 2005 NOR and HOR supplementation juvenile Chinook salmon. Survival of NOR parr Chinook salmon migrating from Johnson Creek to Lower Granite and McNary dams was 28.2% and 16.2%. Survival of NOR presmolt Chinook salmon migrating from Johnson Creek to Lower Granite and McNary dams was 28.2% and 22.3%. Survival of NOR smolt Chinook salmon migrating from Johnson Creek to Lower Granite and McNary dams was 44.7% and 32.9%. Survival of HOR smolt Chinook salmon migrating from Johnson Creek to Lower Granite and McNary dams was 31.9% and 26.2%. Multi-year analysis on smolt to adult return rate's (SAR's) and progeny to parent ratio's (P:P's) were calculated for NOR and HOR supplementation Brood Year 2002 Chinook salmon. SAR's were calculated from Johnson Creek to Johnson Creek (JC to JC), Lower Granite Dam to Lower Granite (LGD to LGD), and Lower Granite Dam to Johnson Creek (LGD to JC); for NOR fish SAR's were 0.16%, 1.16% and 1.12%, while HOR supplementation SAR's from JC to JC, LGD to LGD and LGD to JC were 0.04%, 0.19% and 0.13%. P:P's for all returning NOR and HOR supplemented adults were under replacement levels at 0.13 and 0.65, respectively. Recruit per spawner estimates (R/S) for Brood Year 2005 adult Chinook salmon were also calculated for NOR and HOR supplemented Chinook salmon at JC and LGD. R/S estimates for NOR and HOR supplemented fish at JC were 231 and 1,745, while R/S estimates at LGD were 67 and 557. Management recommendations address (1) effectiveness of data collection methods, (2) sufficiency of data quality (statistical power) to enable management recommendations, (3) removal of uncertainty and subsequent cessation of M&E activities, and (4) sufficiency of findings for program modifications prior to

  19. Management of dams for the next Millennium: proceedings of the 1999 Canadian Dam Association

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    The meeting featured seven sessions with 18 papers abstracted/indexed therein as follows: keynote address: tailings dams safety - implications for the dam safety community; 1 - design and performance: performance monitoring of dams: are we doing what we should be doing?; tailings dams from the perspective of conventional dam engineering; and design overview of Syncrude's Mildred Lake east toe berm; 2 - design and modelling: use of a 2D model for a dam break study on the ALCAN hydroelectric complex in Quebec; and spillway design implications resulting from changes in rainfall extremes; 3 - risk and dam safety I: closing the gaps in the dam safety guidelines; the reality of life safety consequence classification; and surveillance practices for the next millenium; 4 - risk and dam safety II: quantitative risk-assessment using the capacity-demand analysis; and new guidelines for dam safety classification; 5 - millenium issues: expectations of immortality, dam safety management into the next millenium; 6 - rehabilitation techniques: the unconventional application of conventional materials; nondestructive testing technology to characterize concrete dam/bedrock interface; method and instrument for detecting crack in concrete; and grouting of the cracks in the Arch 5-6 - Daniel Johnson Dam; and 7 - case studies: rehabilitation of an 80 year old Ambursen type dam; and debris booms for the protection of spillways.

  20. Evaluating safety of concrete gravity dam on weak rock: Scott Dam

    International Nuclear Information System (INIS)

    Goodman, R.E.; Ahlgren, C.S.

    2000-01-01

    Scott Dam is owned and operated by Pacific Gas and Electric Co. (PG and E) as part of the Potter Valley Project. Although it is an unimpressive concrete gravity dam [233 m (765 ft) long with maximum water surface 33.4 m (110 ft) above tail water], the dam has unusually complex and weak foundation rocks; thick condition caused design changes during construction, numerous subsequent special investigations, and several corrections and additions. A main stumbling block to clarification of the dam safety issue for Scott Dam has always been difficulty in characterizing the foundation material. This paper discusses an approach to this problem as well s how the safety of the dam was subsequently confirmed. Following a comprehensive program of research, investigations, and analysis from 1991 to 1997

  1. Dam removal: Listening in

    Science.gov (United States)

    Foley, M. M.; Bellmore, J. R.; O'Connor, J. E.; Duda, J. J.; East, A. E.; Grant, G. E.; Anderson, C. W.; Bountry, J. A.; Collins, M. J.; Connolly, P. J.; Craig, L. S.; Evans, J. E.; Greene, S. L.; Magilligan, F. J.; Magirl, C. S.; Major, J. J.; Pess, G. R.; Randle, T. J.; Shafroth, P. B.; Torgersen, C. E.; Tullos, D.; Wilcox, A. C.

    2017-07-01

    Dam removal is widely used as an approach for river restoration in the United States. The increase in dam removals—particularly large dams—and associated dam-removal studies over the last few decades motivated a working group at the USGS John Wesley Powell Center for Analysis and Synthesis to review and synthesize available studies of dam removals and their findings. Based on dam removals thus far, some general conclusions have emerged: (1) physical responses are typically fast, with the rate of sediment erosion largely dependent on sediment characteristics and dam-removal strategy; (2) ecological responses to dam removal differ among the affected upstream, downstream, and reservoir reaches; (3) dam removal tends to quickly reestablish connectivity, restoring the movement of material and organisms between upstream and downstream river reaches; (4) geographic context, river history, and land use significantly influence river restoration trajectories and recovery potential because they control broader physical and ecological processes and conditions; and (5) quantitative modeling capability is improving, particularly for physical and broad-scale ecological effects, and gives managers information needed to understand and predict long-term effects of dam removal on riverine ecosystems. Although these studies collectively enhance our understanding of how riverine ecosystems respond to dam removal, knowledge gaps remain because most studies have been short (< 5 years) and do not adequately represent the diversity of dam types, watershed conditions, and dam-removal methods in the U.S.

  2. Public safety around dams

    Energy Technology Data Exchange (ETDEWEB)

    Bourassa, H. [Centre d' expertise hydrique du Quebec, Quebec, PQ (Canada)

    2009-07-01

    Fourty public dams are managed on a real-time basis by the Centre d'expertise hydrique du Quebec (CEHQ). This presentation described the public dams owned by the CEHQ and discussed the public safety measures at the dams. The dams serve various purposes, including protection against floods; industrial or drinking water supply; resort or recreational activities; hydroelectric development; and wildlife conservation. Trigger events were also discussed, such as the complaint at Rapides-des-Cedres dam and deaths that occurred in 2004 when water from a dam was released without warning. Several photographs were presented to illustrate that people were unaware of the danger. Initiatives aimed at raising awareness and studying public safety issues were discussed. A pilot project was launched and a permanent committee was created to evaluate all aspects of public safety at the dams owned by CEHQ. The first tasks of the committee were to establish requirements for waterway safety barriers, both upstream and downstream, for all public dams; to establish requirements for safety signage for all public dams; and to develop criteria to decide on safety signage at each dam. figs.

  3. Public safety around dams

    Energy Technology Data Exchange (ETDEWEB)

    Bourassa, H [Centre d' expertise hydrique du Quebec, Quebec, PQ (Canada)

    2009-07-01

    Fourty public dams are managed on a real-time basis by the Centre d'expertise hydrique du Quebec (CEHQ). This presentation described the public dams owned by the CEHQ and discussed the public safety measures at the dams. The dams serve various purposes, including protection against floods; industrial or drinking water supply; resort or recreational activities; hydroelectric development; and wildlife conservation. Trigger events were also discussed, such as the complaint at Rapides-des-Cedres dam and deaths that occurred in 2004 when water from a dam was released without warning. Several photographs were presented to illustrate that people were unaware of the danger. Initiatives aimed at raising awareness and studying public safety issues were discussed. A pilot project was launched and a permanent committee was created to evaluate all aspects of public safety at the dams owned by CEHQ. The first tasks of the committee were to establish requirements for waterway safety barriers, both upstream and downstream, for all public dams; to establish requirements for safety signage for all public dams; and to develop criteria to decide on safety signage at each dam. figs.

  4. High Temperature Materials Laboratory sixth annual report, October 1992--September 1993

    Energy Technology Data Exchange (ETDEWEB)

    Tennery, V.J.; Foust, F.M.

    1993-12-01

    The High Temperature Materials Laboratory has completed its sixth year of operation as a designated Department of Energy User Facility at the Oak Ridge National Laboratory. Growth of the User Program is evidenced by the number of outside institutions executing user agreements since the facility began operation in 1987. A total of 172 nonproprietary agreements (88 university and 84 industry) and 35 proprietary agreements, (2 university, 33 industry) are now in effect. Six other government facilities have also participated in the User Program. Thirty-eight states are represented by these interactions. Ninety-four nonproprietary research proposals (44 from universities, 47 from industry, and 3 from other government facilities) and three proprietary proposals were considered during this reporting period. Nonproprietary research projects active in FY 1993 are summarized.

  5. Changes over time in homicides by women: a register-based study comparing female offenders from 1982 to 1992 and 1993 to 2005.

    Science.gov (United States)

    Putkonen, Hanna; Weizmann-Henelius, Ghitta; Lindberg, Nina; Rovamo, Tuija; Häkkänen, Helinä

    2008-01-01

    The contribution of women to violent offending, including homicide, may be increasing as society changes. The aim of this paper was to test for trends in homicide by women in Finland. A retrospective register-based study was conducted by comparing two national cohorts: one from 1982 to 1992 and the other from 1993 to 2005. There was a small increase in the proportion of homicides committed by women over time, but the most striking difference between the cohorts was in the significantly higher frequency of alcohol abuse/dependence in the later cohort and of being under the influence of alcohol during the crime. Fewer perpetrators were regarded as lacking or being of diminished responsibility in the later cohort. The victims of the earlier cohort were emotionally closer to the offender than those of the later one. In Finland, there have been changes in characteristics of women who commit homicide and their crimes over time, with the apparent development of a subgroup of women who kill who are much more like men who kill than women in the 1980s and early 1990s. Preventing substance abuse and marginalization are likely to be important ways of preventing homicide by both female and male perpetrators. Copyright (c) 2008 John Wiley & Sons, Ltd.

  6. Dam failure analysis for the Lago El Guineo Dam, Orocovis, Puerto Rico

    Science.gov (United States)

    Gómez-Fragoso, Julieta; Heriberto Torres-Sierra,

    2016-08-09

    The U.S. Geological Survey, in cooperation with the Puerto Rico Electric Power Authority, completed hydrologic and hydraulic analyses to assess the potential hazard to human life and property associated with the hypothetical failure of the Lago El Guineo Dam. The Lago El Guineo Dam is within the headwaters of the Río Grande de Manatí and impounds a drainage area of about 4.25 square kilometers.The hydrologic assessment was designed to determine the outflow hydrographs and peak discharges for Lago El Guineo and other subbasins in the Río Grande de Manatí hydrographic basin for three extreme rainfall events: (1) a 6-hour probable maximum precipitation event, (2) a 24-hour probable maximum precipitation event, and (3) a 24-hour, 100-year recurrence rainfall event. The hydraulic study simulated a dam failure of Lago El Guineo Dam using flood hydrographs generated from the hydrologic study. The simulated dam failure generated a hydrograph that was routed downstream from Lago El Guineo Dam through the lower reaches of the Río Toro Negro and the Río Grande de Manatí to determine water-surface profiles developed from the event-based hydrologic scenarios and “sunny day” conditions. The Hydrologic Engineering Center’s Hydrologic Modeling System (HEC–HMS) and Hydrologic Engineering Center’s River Analysis System (HEC–RAS) computer programs, developed by the U.S. Army Corps of Engineers, were used for the hydrologic and hydraulic modeling, respectively. The flow routing in the hydraulic analyses was completed using the unsteady flow module available in the HEC–RAS model.Above the Lago El Guineo Dam, the simulated inflow peak discharges from HEC–HMS resulted in about 550 and 414 cubic meters per second for the 6- and 24-hour probable maximum precipitation events, respectively. The 24-hour, 100-year recurrence storm simulation resulted in a peak discharge of about 216 cubic meters per second. For the hydrologic analysis, no dam failure conditions are

  7. Report of the 33rd Japanese Antarctic Research ExpeditionーActivities of the summer party(1991-1992and wintering party(1992

    Directory of Open Access Journals (Sweden)

    Mitsuo Fukuchi

    1996-03-01

    Full Text Available Summer activities in the 1991/92 austral summer and winter activities in 1992 of the 33rd Japanese Antarctic Research Expedition (JARE are described. The JARE-33 consisted of 16 members of the summer party and 37 members of the wintering party (one member of the wintering party returned with the summer party. Two Brazilian fish physiologists joined the summer party based on the exchange scientist program of the Antarctic Treaty. The icebreaker SHIRASE left Tokyo on 14 November 1991 and arrived at Breid Bay on 18 December, where the closing of Asuka Camp was completed. Then she headed to Syowa Station and arrived there on 4 January 1992. Transportation of cargo by helicopter to Syowa Station was carried out between 23 December 1991 and 18 January 1992. A total of 848t of cargo, including pipe transport of light oil (342kl and freight by oversnow vehicles (215t, were transported. A new central building was constructed from 23 December to 17 February as the start of an 8-year reintegration project of Syowa Station. Three generator engines of 200kVA capacity were overhauled. Concurrently, various research programs such as absolute gravity measurement and field surveys including inland oversnow traverse were performed. However, there were some problems with a super conducting gravity meter while the gravity meter was being tested for winter operation. Therefore, one scientist working on the gravity meter who planned to winter-over decided to leave Syowa Station with the gravity meter. all of the summer party left Syowa Station on 17 February and headed to Sydney, Australia, while oceanographic and marine biological observations were carried out on board. Members of the summer party of JARE-33 and the wintering party of JARE-32 returned to Narita by air on 27 March 1992. The wintering party of JARE-33 worked at Syowa Station from 1 February 1992 to 31 January 1993. The scientific research programs cover the following four major disciplines : (1 upper

  8. Underground dams for irrigation supplies in coastal limestone aquifer, Okinawa, Japan

    Science.gov (United States)

    Yasumoto, J.; Nakano, T.; Nawa, N.

    2011-12-01

    The use of underground dams to store water in regions with arid or tropical climates is a method that has received considerable attention in the last few decades. And now, for the tropical and subtropical islands that are highly vulnerable to climate change underground dams have been attracting attention again as a method of groundwater management. Okinawa Prefecture is Japan's southernmost prefecture, which consists of hundreds of islands in a chain over 1,000 km long, called the Ryukyu Islands which extend southwest from Kyushu to Taiwan. The national irrigation project of the Ryukyu Islands has been carried out, and several underground dams have been constructed. The Komesu and Giiza underground dams are first full scale underground dam facilities constructed for irrigation in Japan. The Komesu underground dam is a salt-water proof type. It prevents salt-water intrusion and provides storage fresh-water for irrigation in coastal limestone aquifer. Giiza underground dam is a dam up type for storage of fresh-water. These groundwater reservoirs are located in the coastal region of southern part of Okinawa (main island), where Ryukyu limestone is extensively distributed. We studied the behaviour of groundwater flow, saltwater intrusion and nitrate nitrogen (NO3-N) in groundwater in this region by using observation data of groundwater and springs through long term (from 1993 to 2010) monitoring. And, a groundwater flow and salt-water intrusion analysis have been conducted with three dimensional numerical model applied to these dam reservoir areas. The MODFLOW-NWT with SWI code and PEST was used to simulate the complex groundwater flow patterns. Through the comparison with simulation and observed data, it was concluded that the cut off wall of underground dams effectively stores the groundwater and prevents the salt-water intrusion in the reservoir areas. The observed groundwater levels at the reservoir areas were almost reproduced by the numerical model, but there

  9. Annual review and summary financial statement 1992/93

    International Nuclear Information System (INIS)

    1993-01-01

    The report of the Board of Directors of Scottish Power for 1992/1993 is presented along with the Chairman's statement, the Chief Executive's Review, and the Environmental Statement. A financial review with group profit and loss account, balance sheets and auditors statement is given. Scottish Power welcomes the findings of the Cadbury Committee report on the Financial Aspects of Corporate Governance which recommends that listed companies should include in their report details of their compliance with a Code of Best Practice Highlights such as the 1,486 million pounds turnover, the 220 million pounds profit and the 11.15p dividend per share are quoted. (UK)

  10. Annual review and summary financial statement 1992/93

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    The report of the Board of Directors of Scottish Power for 1992/1993 is presented along with the Chairman`s statement, the Chief Executive`s Review, and the Environmental Statement. A financial review with group profit and loss account, balance sheets and auditors statement is given. Scottish Power welcomes the findings of the Cadbury Committee report on the Financial Aspects of Corporate Governance which recommends that listed companies should include in their report details of their compliance with a Code of Best Practice Highlights such as the 1,486 million pounds turnover, the 220 million pounds profit and the 11.15p dividend per share are quoted. (UK)

  11. Statistical yearbook 1993. Data available as of 31 December 1994. 40 ed.

    International Nuclear Information System (INIS)

    1995-01-01

    This is the fortieth issue of the United Nations Statistical Yearbook, prepared by the Statistical Division, Department for Economic and Social Information and Policy Analysis of the United Nations Secretariat, since 1948. The present issue contains series covering, in general, 1983-1992 or 1984-1993, using statistics available to the Statistical Division up to 31 December 1994. The Yearbook is based on data compiled by the Statistical Division from over 40 different international and national sources

  12. Teton Dam failure

    Energy Technology Data Exchange (ETDEWEB)

    Snorteland, N. [United States Dept. of the Interior, Washington, DC (United States). Bureau of Reclamation

    2009-07-01

    This case summary discussed an internal erosion failure that occurred at the embankment foundation of Teton Dam. The project was designed as a run-of-the-river power generation facility and to provide irrigation, flood protection, and power generation to the lower Teton region of southern Idaho. The dam site was located next to the eastern Snake River plain, a volcanic filled depression. The foundation's cutoff trench was excavated into the bedrock along the length of the dam. The dam was designed as a zoned earthfill with a height of 305 feet. A trench made of low plasticity windblown silt was designed to connect the embankment core to the rock foundation. Seeps were noted in 1976, and a leak was observed near the toe of the dam. A wet spot appeared on the downstream face of the dam at elevation 5200. A sinkhole then developed. The embankment crest collapsed, and the dam breached. Peak outflow was estimated at 1,000,000 cfs. The failure was attributed to a lack of communication between designers, a failure to understand geologic information about the region, and an insufficient review of designs and specifications by designers and field personnel. No monitoring instrumentation was installed in the embankment. Approximately 300 square miles were inundated, and 25,000 people were displaced. Eleven people were killed. A review group noted that the rock surface was not adequately sealed, and that the dam failed as a result of inadequate protection of the impervious core material from internal erosion. 42 figs.

  13. How big of an effect do small dams have? Using geomorphological footprints to quantify spatial impact of low-head dams and identify patterns of across-dam variation

    Science.gov (United States)

    Fencl, Jane S.; Mather, Martha E.; Costigan, Katie H.; Daniels, Melinda D.

    2015-01-01

    Longitudinal connectivity is a fundamental characteristic of rivers that can be disrupted by natural and anthropogenic processes. Dams are significant disruptions to streams. Over 2,000,000 low-head dams (research and conservation is impaired by not knowing the magnitude of low-head dam impacts. Based on the geomorphic literature, we refined a methodology that allowed us to quantify the spatial extent of low-head dam impacts (herein dam footprint), assessed variation in dam footprints across low-head dams within a river network, and identified select aspects of the context of this variation. Wetted width, depth, and substrate size distributions upstream and downstream of six low-head dams within the Upper Neosho River, Kansas, United States of America were measured. Total dam footprints averaged 7.9 km (3.0–15.3 km) or 287 wetted widths (136–437 wetted widths). Estimates included both upstream (mean: 6.7 km or 243 wetted widths) and downstream footprints (mean: 1.2 km or 44 wetted widths). Altogether the six low-head dams impacted 47.3 km (about 17%) of the mainstem in the river network. Despite differences in age, size, location, and primary function, the sizes of geomorphic footprints of individual low-head dams in the Upper Neosho river network were relatively similar. The number of upstream dams and distance to upstream dams, but not dam height, affected the spatial extent of dam footprints. In summary, ubiquitous low-head dams individually and cumulatively altered lotic ecosystems. Both characteristics of individual dams and the context of neighboring dams affected low-head dam impacts within the river network. For these reasons, low-head dams require a different, more integrative, approach for research and management than the individualistic approach that has been applied to larger dams.

  14. Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2, Docket Nos. 50-390 and 50-391, Tennessee Valley Authority. Supplement number 20

    International Nuclear Information System (INIS)

    1996-02-01

    This report supplements the Safety Evaluation Report (SER), NUREG-0847 (June 1982), Supplement No. 1 (September 1982), Supplement No. 2 (January 1984), Supplement No. 3 (January 1985), Supplement No. 4 (March 1985), Supplement No. 5 (November 1990), Supplement No. 6 (April 1991), Supplement No. 7 (September 1991), Supplement No. 8 (January 1992), Supplement No. 9 (June 1992), Supplement No. 10 (October 1992), Supplement No. 11 (April 1993), Supplement No. 12 (October 1993), Supplement No. 13 (April 1994), Supplement No. 14 (December 1994), Supplement No. 15 (June 1995), Supplement No. 16 (September 1995), Supplement No. 17 (October 1995), Supplement No. 18 (October 1995), and Supplement No. 19 (November 1995) issued by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by the Tennessee Valley Authority, as applicant and owner, for licenses to operate the Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). The facility is located in Rhea County, Tennessee, near the Watts Bar Dam on the Tennessee River. This supplement provides recent information regarding resolution of some of the issues identified in the SER

  15. Safety Evaluation Report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Numbers 50-390 and 50-391)

    International Nuclear Information System (INIS)

    1994-04-01

    This report supplements the Safety Evaluation Report (SER), NUREG-0847 (June 1982), Supplement No. 1 (September 1982), Supplement No. 2 (January 1984), Supplement No. 3 (January 1985), Supplement No. 4 (March 1985), Supplement No. 5 (November 1990), Supplement No. 6 (April 1991), Supplement No. 7 (September 1991), Supplement No. 8 (January 1992), Supplement No. 9 (June 1992), Supplement No. 10 (October 1992), Supplement No. 11 (April 1993), and Supplement No. 12 (October 1993), issued by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by the Tennessee Valley Authority, as applicant and owner, for licenses to operate the Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). The facility is located in Rhea County, Tennessee, near the Watts Bar Dam on the Tennessee River. This supplement provides recent information regarding resolution of some of the outstanding and confirmatory items, and proposed license conditions identified in the SER. These issues relate to: Design criteria -- structures, components, equipment, and systems; Reactor; Instrumentation and controls; Electrical power systems; Auxiliary systems; Conduct of operations; Accident analysis; and Quality assurance

  16. The prevalence of the metabolic syndrome did not increase in Mexico City between 1990-1992 and 1997-1999 despite more central obesity.

    Science.gov (United States)

    Lorenzo, Carlos; Williams, Ken; Gonzalez-Villalpando, Clicerio; Haffner, Steven M

    2005-10-01

    Trends in the metabolic syndrome might follow trends in obesity. We examined this hypothesis in the Mexico City Diabetes Study (MCDS), a study that showed rising trends in obesity, and the effect of the metabolic syndrome on the risk of coronary heart disease (CHD). Designed as a population-based study, the MCDS enrolled subjects in 1990-1992 (n = 2,282). Follow-up visits were held in 1993-1995 (n = 1,764) and 1997-1999 (n = 1,754). We used the revised metabolic syndrome definition of the National Cholesterol Education Program and the Framingham equations to estimate the 10-year CHD risk. In men, the age-adjusted prevalence of the metabolic syndrome was 38.9% in 1990-1992, 43.4% in 1993-1995, and 39.9% in 1997-1999; in women, the prevalences were 65.4, 65.7, and 59.9%, respectively. The prevalence did not change in men (P = 0.349) between 1990-1992 and 1997-1999, but decreased in women (P metabolic syndrome nor CHD risk has increased in Mexico City. Lower blood pressure and triglyceride values appear to have counteracted increases in central obesity and fasting glucose.

  17. Quarterly Report to the New Energy and Industrial Technology Development Organization, Washington, D.C., by Analysis Review and Critique, dated March 23, 1992

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-03-23

    U.S. Government assistance on renewable energy for lesser developed countries and Bush Administration's 1993 budget for renewable energy are reported. The latest renewable energy assistance for less developed countries was for Pakistan, India, Egypt, Morocco, and the Philippines. Facilities in Egypt and Morocco were closed, and the Pakistani facility turned an independent power station not for renewable energy. In 1992, assistance is extended to Costa Rica, Indonesia, and India. Assistance to Mexico is on the increase. The Bush Administration request for fiscal 1993 for renewable energy was only 1.6 percent higher than the funding Congress approved for fiscal 1992. When inflation is taken into account, it means that the real budget expenditure will shrink a few percent. This indicates that the Department of Energy changed its policy several years ago and is now requesting less than what Congress may approve. (NEDO)

  18. Mechanics of slide dams

    International Nuclear Information System (INIS)

    Young, G.A.

    1970-01-01

    Studies which promote the use of nuclear energy for peaceful projects in engineering are sponsored by the Atomic Energy Commission under the Plowshare program. Specific projects being considered include the construction of harbors, canals, and dams. Of these projects, perhaps the most difficult to accomplish will be the latter. This paper which is in two parts considers the problems which are associated with the construction of slide dams with nuclear explosives. It examines first the characteristics of conventional earth and rock-fill dams which are based upon proven techniques developed after many years of experience. The characteristics of natural landslide dams are also briefly considered to identify potential problems that must be overcome by slide dam construction techniques. Second, the mechanics of slide dams as determined from small-scale laboratory studies are presented. It is concluded that slide dams can be constructed and that small-scale field tests and additional laboratory studies are justified. (author)

  19. Mechanics of slide dams

    Energy Technology Data Exchange (ETDEWEB)

    Young, G A [Engineering, Agbabian-Jacobsen Associates, Los Angeles (United States)

    1970-05-15

    Studies which promote the use of nuclear energy for peaceful projects in engineering are sponsored by the Atomic Energy Commission under the Plowshare program. Specific projects being considered include the construction of harbors, canals, and dams. Of these projects, perhaps the most difficult to accomplish will be the latter. This paper which is in two parts considers the problems which are associated with the construction of slide dams with nuclear explosives. It examines first the characteristics of conventional earth and rock-fill dams which are based upon proven techniques developed after many years of experience. The characteristics of natural landslide dams are also briefly considered to identify potential problems that must be overcome by slide dam construction techniques. Second, the mechanics of slide dams as determined from small-scale laboratory studies are presented. It is concluded that slide dams can be constructed and that small-scale field tests and additional laboratory studies are justified. (author)

  20. Dam break analysis and flood inundation map of Krisak dam for emergency action plan

    Science.gov (United States)

    Juliastuti, Setyandito, Oki

    2017-11-01

    The Indonesian Regulation which refers to the ICOLD Regulation (International Committee on Large Dam required have the Emergency Action Plan (EAP) guidelines because of the dams have potential failure. In EAP guidelines there is a management of evacuation where the determination of the inundation map based on flood modeling. The purpose of the EAP is to minimize the risk of loss of life and property in downstream which caused by dam failure. This paper will describe about develop flood modeling and inundation map in Krisak dam using numerical methods through dam break analysis (DBA) using hydraulic model Zhong Xing HY-21. The approaches of dam failure simulation are overtopping and piping. Overtopping simulation based on quadrangular, triangular and trapezium fracture. Piping simulation based on cracks of orifice. Using results of DBA, hazard classification of Krisak dam is very high. The nearest village affected dam failure is Singodutan village (distance is 1.45 kilometer from dam) with inundation depth is 1.85 meter. This result can be used by stakeholders such as emergency responders and the community at risk in formulating evacuation procedure.

  1. Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Buettner, Edwin W.; Putnam, Scott A. [Idaho Department of Fish and Game

    2009-02-18

    Chinook salmon and 2.4-fold for hatchery steelhead as discharge increased between 50 kcfs and 100 kcfs. Fish tagged with passive integrated transponder (PIT) tags at the Snake River and Salmon River traps were interrogated at four dams with PIT tag detection systems (Lower Granite, Little Goose, Lower Monumental, and McNary dams). Because of the addition of the fourth interrogation site (Lower Monumental) in 1993 and the installation of the Removable Spillway Weir at Lower Granite Dam in 2001, caution must be used in comparing cumulative interrogation data. Cumulative interrogations at the four dams for fish marked at the Snake River trap were 65% for hatchery Chinook, 72% for wild Chinook, 66% for hatchery steelhead, and 67% for wild steelhead. Cumulative interrogations at the four dams for fish marked at the Salmon River trap were 48% for hatchery Chinook, 61% for wild Chinook salmon, 57% for hatchery steelhead trout, and 56% for wild steelhead trout.

  2. Spruce Lake Dam reconstruction

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, G. [SGE Acres Ltd., Fredericton, NB (Canada); Barnard, J. [SGE Acres Ltd., St. John' s, NF (Canada); Vriezen, C. [City of Saint John, NF (Canada); Stephenson, M. [Jacques Whitford Environment Ltd., Fredericton, NB (Canada)

    2004-09-01

    Spruce Lake Dam was constructed in 1898 as part of the water supply system for Saint John, New Brunswick. The original dam was a 6 meter high, 140 meter long concrete gravity dam with an intake structure at its mid point and an overflow spillway at the left abutment. A rehabilitation project was launched in 2001 to bring the deteriorated dam into conformance with the dam safety guidelines of the Canadian Dam Association. The project criteria included minimal disruption to normal operation of water supply facilities and no negative effect on water quality. The project involved installation of a new low level outlet, removal of a gate house and water intake pipes, replacement of an access road culvert in the spillway channel, and raising the earth dam section by 1.8 meters to allow for increased water storage. The new raised section has an impervious core. The project also involved site and geotechnical investigations as well as hydrotechnical and environmental studies. This presentation described the final design of the remedial work and the environmental permitting procedures. Raising the operating level of the system proved successful as demonstrated by the fewer number of pumping days required after dam rehabilitation. The dam safety assessment under the Canadian Environmental Assessment Act began in April 2001, and the rehabilitation was completed by the end of 2002. 1 tab., 8 figs.

  3. The relationship between survival of Columbia River fall chinook salmon and in-river environmental factors -- Analysis of historic data for juvenile and adult salmonid production: Phase 2. Final report

    International Nuclear Information System (INIS)

    Skalski, J.R.; Townsend, R.L.; Donnelly, R.F.; Hilborn, R.W.

    1996-12-01

    This project analyzes in greater detail the coded-wire-tag (CWT) returns of Priest Rapids Hatchery fall chinook for the years 1976--1989 initially begun by Hilborn et al. (1993a). These additional analyses were prompted by suggestions made by peer reviews of the initial draft report. The initial draft and the peer review comments are included in this final report (Appendices A and B). The statistical analyses paired Priest Rapids stock with potential downriver reference stocks to isolate in-river survival rates. Thirty-three potential reference stocks were initially examined for similar ocean recovery rates; the five stocks with the most similar recovery patterns (i.e., Bonneville Brights, Cowlitz, Gray's River, Tanner Creek, and Washougal) to the Priest Rapids stock were used in the subsequent analysis of in-river survival. Three alternate forms of multiple regression models were used to investigate the relationship between predicted in-river survival and ambient conditions. Analyses were conducted with and without attempts to adjust for smolt transportation at McNary Dam. Independent variables examined in the analysis included river flows, temperature, turbidity, and spill along with the total biomass of hatchery releases in the Columbia-Snake River Basin

  4. Monitoring of downstream salmon and steelhead at Federal hydroelectric facilities. Annual report 1993

    International Nuclear Information System (INIS)

    Wood, L.A.; Martinson, R.D.; Graves, R.J.; Carroll, D.R.; Killins, S.D.

    1994-04-01

    The seaward migration of juvenile salmonids was monitored by the National Marine Fisheries Service (NMFS) at Bonneville and John Day Dams on the Columbia River in 1993 (river mile 145 and 216, respectively, Figure 1). The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program is carried out under the auspices of the Northwest Power Planning Council Fish and Wildlife Program and is funded by the Bonneville Power Administration. The purpose of the SMP is to index Columbia Basin juvenile salmonid stocks and develop and implement flow and spill requests intended to facilitate fish passage. Data is also used for travel time, migration timing and relative run size magnitude analysis. The purpose of the NMFS portion of the program is to provide FPC with species specific data; numbers, condition, length, brand recaptures and flow data from John Day, and Bonneville Dams on a daily basis

  5. Potentiometric surfaces of the intermediate aquifer system, west-central Florida, May, 1993

    Science.gov (United States)

    Mularoni, R.A.

    1994-01-01

    The intermediate aquifer system underlies a 5000-sq-mi area including De Soto, Sarasota, Hardee, Manatee, and parts of Charlotte, Hillsborough, Highlands, and Polk Counties, Florida. It is overlain by the surf@cial aquifer system and underlain by the Floridan aquifer system. The potentiometric surface of the intermediate aquifer system was mapped by determining the altitude of water levels in a network of wells and represented on a map by contours that connect points of equal altitude. This map represents water-level conditions near the end of the spring dry season when ground- water withdrawals for agricultural use were high. The cumulative rainfall for the study area was 4.84 inches above normal for the period from June 1992 to May 1993. Hydrographs for selected wells indicated that the annual and seasonal fluctuations of the water levels were generally large (greater than 15 feet) in the central interior region where water demand for irrigation is high during the fall and spring. Seasonal fluctuations were smaller in the northern recharge area where water use is predominantly for public supply. Water levels measured in May 1993 for the composite intermediate aquifer potentiometric surface were lower than those measured in May or September 1992. A cone of depression exists in the potentiometric surface for the composite aquifer system at Warm Mineral Springs, which is a natural discharge point from this system.

  6. Waste-Management Education and Research Consortium (WERC) annual progress report, 1992--1993

    Energy Technology Data Exchange (ETDEWEB)

    Eiceman, Gary A.; King, J. Phillip; Smith, Geoffrey B.; Park, Su-Moon; Munson-McGee, Stuart H.; Rajtar, Jerzy; Chen, Z.; Johnson, James E.; Heger, A. Sharif; Martin, David W.; Wilks, Maureen E.; Schreyer, H. L.; Thomson, Bruce M.; Samani, Zohrab A.; Hanson, Adrian; Cadena, Fernando; Gopalan, Aravamudan; Barton, Larry L.; Sillerud, Laurel O.; Fekete, Frank A.; Rogers, Terry; Lindemann, William C.; Pigg, C. Joanne; Blake, Robert; Kieft, Thomas L.; Ross, Timothy J.; LaPointe, Joe L.; Khandan, Nirmala; Bedell, Glenn W.; Rayson, Gary D.; Leslie, Ian H.; Ondrias, Mark R.; Starr, Gregory P.; Colbaugh, Richard; Niemczyk, Thomas M.; Campbell, Andrew; Phillips, Fred; Wilson, John L.; Gutjahr, Allan; Sammis, T. W.; Steinberg, Stanly; Nuttall, H. E.; Genin, Joseph; Conley, Edgar; Aimone-Martin, Catherine T.; Wang, Ming L.; Chua, Koon Meng; Smith, Phillip; Skowland, Chris T.; McGuckin, Tom; Harrison, Glenn; Jenkins-Smith, Hank C.; Kelsey, Charles A.

    1993-02-15

    This report contains the following appendices: Appendix A - Requirements for Undergraduate Level; Appendix B - Requirements for Graduate Level; Appendix C - Graduate Degree In Environmental Engineeringat New Mexico State University; Appendix D - Non-degree Certificate program; Appendix E - Curriculum for Associate Degree Program in Radioactive Hazardous Waste Materials; Appendix F - Curriculum for NCC Program in Earth Environmental Sciences; Appendix G - Brochure of 1992 Teleconference Series; Appendix H - Sites for Hazardous/Radioactive Waste Management Series; Appendix I - WERC Interactive Television Courses; Appendix J - WERC Research Seminar Series Brochures; Appendix K - Summary of Technology Development of the Third Year; Appendix L - List of Major Publications Resulting From WERC; Appendix M - Types of Equipment at WERC Laboratories; and Appendix N - WERC Newsletter Examples.

  7. Deformation Monitoring and Bathymetry Analyses in Rock-Fill Dams, a Case Study at Ataturk Dam

    Science.gov (United States)

    Kalkan, Y.; Bilgi, S.

    2014-12-01

    Turkey has 595 dams constructed between 1936 and 2013 for the purposes of irrigation, flood control, hydroelectric energy and drinking water. A major portion of the dam basins in Turkey are deprived of vegetation and have slope topography on near surrounding area. However, landscaping covered with forest around the dam basin is desirable for erosion control. In fact; the dams, have basins deprived of vegetation, fill up quickly due to sediment transport. Erosion control and forestation are important factors, reducing the sediment, to protect the water basins of the dams and increase the functioning life of the dams. The functioning life of dams is as important as the investment and construction. Nevertheless, in order to provide safety of human life living around, well planned monitoring is essential for dams. Dams are very large and critical structures and they demand the use or application of precise measuring systems. Some basic physical data are very important for assessing the safety and performance of dams. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. Monitoring is an essential component of the dam after construction and during operation and must en­able the timely detection of any behavior that could deteriorate the dam, potentially result in its shutdown or failure. Considering the time and labor consumed by long-term measurements, processing and analysis of measured data, importance of the small structural motions at regular intervals could be comprehended. This study provides some information, safety and the techniques about the deformation monitoring of the dams, dam safety and related analysis. The case study is the deformation measurements of Atatürk Dam in Turkey which is the 6th largest dam of world considering the filling volume of embankment. Brief information is given about the

  8. Small dams need better management

    Science.gov (United States)

    Balcerak, Ernie

    2012-03-01

    Many small dams around the world are poorly maintained and represent a safety hazard, according to Pisaniello et al. Better oversight of small dams is needed, the authors argue. The researchers reviewed literature, conducted case studies in four states in Australia, and developed policy benchmarks and best practices for small-dam management. Small dams, often just several meters high and typically privately owned by individual farmers, have historically caused major damage when they fail. For instance, in China in 1975, 230,000 people died when two large dams failed because of the cumulative failure of 60 smaller upstream dams. In the United States, in 1977 the 8-meter-high Kelly Barnes Lake dam failed, killing 39 people. Many other small-dam failures around the world have resulted in casualties and severe ecological and economic damage.

  9. The Impact of Dam-Reservoir-Foundation Interaction on Nonlinear Response of Concrete Gravity Dams

    International Nuclear Information System (INIS)

    Amini, Ali Reza; Motamedi, Mohammad Hossein; Ghaemian, Mohsen

    2008-01-01

    To study the impact of dam-reservoir-foundation interaction on nonlinear response of concrete gravity dams, a two-dimensional finite element model of a concrete gravity dam including the dam body, a part of its foundation and a part of the reservoir was made. In addition, the proper boundary conditions were used in both reservoir and foundation in order to absorb the energy of outgoing waves at the far end boundaries. Using the finite element method and smeared crack approach, some different seismic nonlinear analyses were done and finally, we came to a conclusion that the consideration of dam-reservoir-foundation interaction in nonlinear analysis of concrete dams is of great importance, because from the performance point of view, this interaction significantly improves the nonlinear response of concrete dams

  10. The Glen Canyon Dam adaptive management program: progress and immediate challenges

    Science.gov (United States)

    Hamill, John F.; Melis, Theodore S.; Boon, Philip J.; Raven, Paul J.

    2012-01-01

    Adaptive management emerged as an important resource management strategy for major river systems in the United States (US) in the early 1990s. The Glen Canyon Dam Adaptive Management Program (‘the Program’) was formally established in 1997 to fulfill a statutory requirement in the 1992 Grand Canyon Protection Act (GCPA). The GCPA aimed to improve natural resource conditions in the Colorado River corridor in the Glen Canyon National Recreation Area and Grand Canyon National Park, Arizona that were affected by the Glen Canyon dam. The Program achieves this by using science and a variety of stakeholder perspectives to inform decisions about dam operations. Since the Program started the ecosystem is now much better understood and several biological and physical improvements have been achieved. These improvements include: (i) an estimated 50% increase in the adult population of endangered humpback chub (Gila cypha) between 2001 and 2008, following previous decline; (ii) a 90% decrease in non-native rainbow trout (Oncorhynchus mykiss), which are known to compete with and prey on native fish, as a result of removal experiments; and (iii) the widespread reappearance of sandbars in response to an experimental high-flow release of dam water in March 2008.Although substantial progress has been made, the Program faces several immediate challenges. These include: (i) defining specific, measurable objectives and desired future conditions for important natural, cultural and recreational attributes to inform science and management decisions; (ii) implementing structural and operational changes to improve collaboration among stakeholders; (iii) establishing a long-term experimental programme and management plan; and (iv) securing long-term funding for monitoring programmes to assess ecosystem and other responses to management actions. Addressing these challenges and building on recent progress will require strong and consistent leadership from the US Department of the Interior

  11. Passage of north temperate fish through the Cowan Dam Denil fishway

    International Nuclear Information System (INIS)

    Christense, B.

    1994-01-01

    Fish passage through a standard Denil fishway under low tailwater conditions was studied at Cowan Dam in Saskatchewan in 1990. In 1991 and 1992, fish passage through an experimental two-level Denil fishway was studied at the same location under similar flow conditions. Six species of fish used the Cowan Dam Denil fishway in 1990: northern pike, walleye, white sucker, longnose sucker, cisco, and lake whitefish. Tag returns suggest that most fish that congregate below Cowan Dam in the spring originate in Lac Ile-a-la-Crosse 150-200 km downstream. Northern pike waited until spawning had been completed before ascending the fishway. Only 12.1% of the pike congregated below the dam are estimated to have ascended the fishway. During 1990 and 1991, the number of pike ascending the fishway appeared to decline as water velocities in the standard and two-level Denil fishways increased. Mean pike length also declined over the period of fish movement, and as water velocities in the standard Denil declined. Walleye did not appear to have any difficulty ascending the standard Denil in 1990, but they did appear to have difficulty ascending the two-level Denil in 1991. Only 29% of the white suckers that ascended the fishway did so prior to spawning. According to recaptures of tagged fish, 58.8% of white suckers present in the tailwater pool ascended the standard Denil in 1990. White suckers also appeared to be able to ascend the two-level Denil without difficulty. Of the longnose suckers, 98% ascended the fishway prior to spawning in 1990, and appeared to ascend both the standard and two-level fishways without obvious delay or difficulty. Only small numbers of cisco and lake whitefish utilized the standard Denil fishway in 1990. 68 refs., 56 figs., 24 tabs

  12. Study of Dam-break Due to Overtopping of Four Small Dams in the Czech Republic

    Directory of Open Access Journals (Sweden)

    Zakaraya Alhasan

    2015-01-01

    Full Text Available Dam-break due to overtopping is one of the most common types of embankment dam failures. During the floods in August 2002 in the Czech Republic, several small dams collapsed due to overtopping. In this paper, an analysis of the dam break process at the Luh, Velký Bělčický, Melín, and Metelský dams breached during the 2002 flood is presented. Comprehensive identification and analysis of the dam shape, properties of dam material and failure scenarios were carried out after the flood event to assemble data for the calibration of a numerical dam break model. A simple one-dimensional mathematical model was proposed for use in dam breach simulation, and a computer code was compiled. The model was calibrated using the field data mentioned above. Comparison of the erodibility parameters gained from the model showed reasonable agreement with the results of other authors.

  13. Investigation of geophysical methods for assessing seepage and internal erosion in embankment dams : a study of through-dam seismic testing at WAC Bennett Dam

    Energy Technology Data Exchange (ETDEWEB)

    Gaffran, P.; Jeffries, M. [BC Hydro, Burnaby, BC (Canada)

    2005-07-15

    Crosshole tomography is used to establish the distribution of seismic velocity between drill holes. The through-dam mode takes advantage of the triangular cross-section of earth embankments, obviating the need for drill holes. Seismic energy, generated on one face of the dam, passes underneath the crest and is detected by sensors arrayed on the opposite face. The sinkholes discovered at WAC Bennett Dam in 1996 provided an opportunity to test the procedure. Using p-wave energy, two series of measurements were conducted, notably one immediately before remediation of one sinkhole, and a second one shortly after the sinkhole was repaired. The known defect was successfully imaged by the first round of measurements. This report presented the results of an investigation of the through-dam seismic method using propagation of seismic waves through a dam from upstream to downstream, or vice-versa. The purpose of the study was to determine if this procedure could characterize the distribution of seismic velocity within a dam in an accurate and cost effective manner. The report presented the methods of velocity testing such as crosshole and downhole, and tomography; and through-dam measurements. Background to the Bennett Dam studies was also provided, with particular reference to the Bennett Dam sinkholes; sinkhole investigations; working hypothesis for sinkhole development; sinkhole number one characterization; and sinkhole remediation. An analysis of compression wave testing at Bennett Dam and shear wave testing was then offered. Other topics that were discussed included field test procedures; methodologies for data processing; p-waves versus s-waves; applicability of the research; and costs of through-dam surveys. It was concluded that under the right circumstances, through-dam seismic testing was capable of detecting changed conditions in an embankment dam. 15 refs., 2 tabs., 41 figs., 1 appendix.

  14. Description of the global petroleum supply and demand outlook updated for the 1993 edition of the GRI baseline projection of US energy supply and demand, December 1992

    International Nuclear Information System (INIS)

    Dreyfus, D.A.; Koklauner, A.B.

    1992-12-01

    Strategic planning of the research and development program carried out by Gas Research Institute (GRI) is supported by an annual GRI baseline projection of U.S. energy supply and demand. Because petroleum products compete in a wide variety of energy uses, oil prices serve as a market clearing force for the entire energy system. A significant portion of the U.S. petroleum supply is imported, and the price of crude oil to U.S. refiners is determined by the international oil trade. Any projection of the U.S. energy situation, therefore, requires the evaluation of the global oil market and the impact of oil price changes on the supply/demand balances of market participants. The 1992 edition of the projection completed in August 1991 assumed that in the aftermath of the war in the Middle East the fundamentals of oil trade would reassert their influence. This did indeed occur and with astonishing speed. In the face of this outlook, GRI has revised its 1993 oil price track downward

  15. Waste-Management Education and Research Consortium (WERC) annual progress report, 1992--1993

    International Nuclear Information System (INIS)

    1993-01-01

    This report contains the following appendices: Appendix A - Requirements for Undergraduate Level; Appendix B - Requirements for Graduate Level; Appendix C - Graduate Degree In Environmental Engineeringat New Mexico State University; Appendix D - Non-degree Certificate program; Appendix E - Curriculum for Associate Degree Program in Radioactive ampersand Hazardous Waste Materials; Appendix F - Curriculum for NCC Program in Earth ampersand Environmental Sciences; Appendix G - Brochure of 1992 Teleconference Series; Appendix H - Sites for Hazardous/Radioactive Waste Management Series; Appendix I - WERC Interactive Television Courses; Appendix J - WERC Research Seminar Series Brochures; Appendix K - Summary of Technology Development of the Third Year; Appendix L - List of Major Publications Resulting From WERC; Appendix M - Types of Equipment at WERC Laboratories; and Appendix N - WERC Newsletter Examples

  16. Quarterly Report to the New Energy and Industrial Technology Development Organization, Washington, D.C., by Analysis Review and Critique, dated March 23, 1992

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-03-23

    U.S. Government assistance on renewable energy for lesser developed countries and Bush Administration's 1993 budget for renewable energy are reported. The latest renewable energy assistance for less developed countries was for Pakistan, India, Egypt, Morocco, and the Philippines. Facilities in Egypt and Morocco were closed, and the Pakistani facility turned an independent power station not for renewable energy. In 1992, assistance is extended to Costa Rica, Indonesia, and India. Assistance to Mexico is on the increase. The Bush Administration request for fiscal 1993 for renewable energy was only 1.6 percent higher than the funding Congress approved for fiscal 1992. When inflation is taken into account, it means that the real budget expenditure will shrink a few percent. This indicates that the Department of Energy changed its policy several years ago and is now requesting less than what Congress may approve. (NEDO)

  17. Water levels in the Yucca Mountain area, Nevada, 1993

    International Nuclear Information System (INIS)

    Tucci, P.; Goemaat, R.L.; Burkhardt, D.J.

    1996-01-01

    Water levels were monitored in 28 wells in the Yucca Mountain area, Nevada, during 1993. Seventeen wells were monitored periodically, generally on a monthly basis, and 11 wells representing 18 intervals were monitored hourly. All wells monitor water levels in Tertiary volcanic rocks, except one that monitors water levels in Paleozoic carbonate rocks. Water levels were measured using calibrated steel tapes and pressure transducers; steel-tape measurements were corrected for mechanical stretch, thermal expansion, and borehole deviation to obtain precise water-level altitudes. Water-level altitudes in the Tertiary volcanic rocks ranged from about 728 meters above sea level east of Yucca Mountain to about 1,034 meters above sea level north of Yucca Mountain. Water-level altitudes in the well monitoring the Paleozoic carbonate rocks varied between 752 and 753 meters above sea level during 1993. Water levels were an average of about 0.04 meter lower than 1992 water levels. All data were acquired in accordance with a quality-assurance program to support the reliability of the data

  18. New Mexicans` images and perceptions of Los Alamos National Laboratory. Winter, 1992--1993

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-01-01

    This report uses survey data to profile New Mexico residents` images and perceptions of Los Alamos National Laboratory (LANL). The survey results are the responses of a representative, stratified random sample of 992 New Mexico households to a set of questions asked in October, 1992. The data allow statistical inference to the general population`s responses to the same set of questions at the time the survey was administered. The results provide an overview of New Mexico residents` current images and perceptions of the Laboratory. The sample margin of error is plus or minus 3.5% at the 95% confidence level.

  19. Health physics in JAERI No. 35 (April 1, 1992 ∼ March 31, 1993)

    International Nuclear Information System (INIS)

    1993-09-01

    In the annual report No. 35 (fiscal 1992) are described the activities of health physics in Tokai Research Establishment, Takasaki Radiation Chemistry Research Establishment, Oarai Research Establishment, Mutsu Establishment and Nuclear Ship Mutsu. In all the establishments, radiation monitoring in nuclear facilities, individual monitoring, environmental monitoring and maintenance of monitoring instruments were carried out as in the previous years. There were no occupational exposure exceeding the dose equivalent limit and no release of radioactive gaseous and liquid wastes beyond the release limits specified according to the regulations. In the environment there were detected no abnormal radioactivity due to the facilities. (author)

  20. Perspectives on dam safety in Canada

    International Nuclear Information System (INIS)

    Halliday, R.

    2004-01-01

    Canadian dam safety issues were reviewed from the perspective of a water resources engineer who is not a dam safety practitioner. Several external factors affecting dam safety were identified along with perceived problems in dam safety administration. The author claims that the main weakness in safety practices can be attributed to provincial oversights and lack of federal engagement. Some additions to the Canadian Dam Safety Guidelines were proposed to address these weaknesses. Canada has hundreds of large dams and high hazard dams whose failure would result in severe downstream consequences. The safety of dams built on boundary waters shared with the United States have gained particular attention from the International Joint Commission. This paper also examined safety criteria for concerns such as aging dams, sabotage and global climate change that may compromise the safety of a dam. 26 refs

  1. 78 FR 53494 - Dam Safety Modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams

    Science.gov (United States)

    2013-08-29

    ... Bar Dams AGENCY: Tennessee Valley Authority. ACTION: Issuance of Record of Decision. SUMMARY: This... the dam safety modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams. The notice of... Loudoun, Tellico, and Watts Bar Dams was published in the Federal Register on May 31, 2013. This...

  2. An appraisal of the 1992 preliminary performance assessment for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Lee, W.W.L.; Chaturvedi, L.; Silva, M.K.; Weiner, R.; Neill, R.H.

    1994-09-01

    The purpose of the New Mexico Environmental Evaluation Group is to conduct an independent technical evaluation of the Waste Isolation Pilot Plant (WIPP) Project to ensure the protection of the public health and safety and the environment. The WIPP Project, located in southeastern New Mexico, is being constructed as a repository for the disposal of transuranic (TRU) radioactive wastes generated by the national defense programs. The Environmental Evaluation Group (EEG) has reviewed the WIPP 1992 Performance Assessment (Sandia WIPP Performance Assessment Department, 1992). Although this performance assessment was released after the October 1992 passage of the WIPP Land Withdrawal Act (PL 102-579), the work preceded the Act. For individual and ground-water protection, calculations have been done for 1000 years post closure, whereas the US Environmental Protection Agency's Standards (40 CFR 191) issued in 1993 require calculations for 10,000 years. The 1992 Performance Assessment continues to assimilate improved understanding of the geology and hydrogeology of the site, and evolving conceptual models of natural barriers. Progress has been made towards assessing WIPP's compliance with the US Environmental Protection Agency's Standards (40 CFR 191). The 1992 Performance Assessment has addressed several items of major concern to EEG, outlined in the July 1992 review of the 1991 performance assessment (Neill et al., 1992). In particular, the authors are pleased that some key results in this performance assessment deal with sensitivity of the calculated complementary cumulative distribution functions (CCDF) to alterative conceptual models proposed by EEG -- that flow in the Culebra be treated as single-porosity fracture-flow; with no sorption retardation unless substantiated by experimental data

  3. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1993

    International Nuclear Information System (INIS)

    1993-12-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1993 (July 1, 1992, through June 30, 1993). To capture employment benefits, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Rifle, and Gunnison, Colorado. An estimated 52 percent of the employees working on the UMTRA Project responded to this information request. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized

  4. New Brunswick Power Corporation annual report, 1993/94

    International Nuclear Information System (INIS)

    1994-01-01

    Net income for New Brunswick Power in the year 1993/94 was $23.7 million, up from $1.1 million the previous year. Total revenues decreased by $7.4 million as decreases in export sales were greater than in-province load growth and due to the impacts of a 5% rate increase in 1992 and 2.9% increase in January 1994. In-province energy sales revenues totalled $732.8 million, an increase of $25.1 million from 1992/93. Residential energy sales increased by 2.1% while the those to industrial customers declined by 1.4%, due to continuing economic difficulties in the pulp and paper and mining sector. Out of province revenues decreased by $33.3 million or 19.7%, with total energy exports decreasing by 688.6 GWh to 2453.6 GWh. A significant highlight of the year was integration of the Belledune generating station onto the New Brunswick system in October. A state-of-the-art coal fired facility, Belledune will contribute 450 MW to the system. Its flue gas scrubber will reduce sulfur dioxide emissions by 90%. 6 figs., 9 tabs

  5. New Brunswick Power Corporation annual report, 1993/94

    International Nuclear Information System (INIS)

    1994-01-01

    Net income for New Brunswick Power in the year 1993/94 was $23.7 million, up from $1.1 million the previous year. Total revenues decreased by $7.4 million as decreases in export sales were greater than in-province load growth and due to the impacts of a 5% rate increase in 1992 and 2.9% increase in January 1994. In-province energy sales revenues totalled $732.8 million, an increase of $25.1 million from 1992/93. Residential energy sales increased by 2.1% while the those to industrial customers declined by 1.4%, due to continuing economic difficulties in the pulp and paper and mining sector. Out of province revenues decreased by $33.3 million or 19.7%, with total energy exports decreasing by 688.6 GWh to 2453.6 GWh. A significant highlight of the year was integration of the Belledune generating station onto the New Brunswick sytem in October. A state-of-the-art coal fired facility, Belledune will contribute 450 MW to the system. Its flue gas scrubber will reduce sulfur dioxide emissions by 90%. 6 figs., 9 tabs

  6. Safeguards and Security Technology Development Directory. FY 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    The Safeguards and Security Technology Development Directory is published annually by the Office of Safeguards and Security (OSS) of the US Department of Energy (DOE), and is Intended to inform recipients of the full scope of the OSS R&D program. It is distributed for use by DOE headquarters personnel, DOE program offices, DOE field offices, DOE operating contractors, national laboratories, other federal agencies, and foreign governments. Chapters 1 through 7 of the Directory provide general information regarding the Technology Development Program, including the mission, program description, organizational roles and responsibilities, technology development lifecycle, requirements analysis, program formulation, the task selection process, technology development infrastructure, technology transfer activities, and current research and development tasks. These chapters are followed by a series of appendices which contain more specific information on aspects of the Program. Appendix A is a summary of major technology development accomplishments made during FY 1992. Appendix B lists S&S technology development reports issued during FY 1992 which reflect work accomplished through the OSS Technology Development Program and other relevant activities outside the Program. Finally, Appendix C summarizes the individual task statements which comprise the FY 1993 Technology Development Program.

  7. Development of a System-Wide Predator Control Program: Stepwise Implementation of a Predation Index, Predator Control Fisheries, and Evaluation Plan in the Columbia River Basin; Northern Pikeminnow Management Program, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Porter, Russell G.; Winther, Eric C.; Fox, Lyle G.

    2003-03-01

    This report presents results for year eleven in a basin-wide program to harvest northern pikeminnow (Ptychocheilus oregonensis). This program was started in an effort to reduce predation by northern pikeminnow on juvenile salmonids during their emigration from natal streams to the ocean. Earlier work in the Columbia River Basin suggested predation by northern pikeminnow on juvenile salmonids might account for most of the 10-20% mortality juvenile salmonids experience in each of eight Columbia River and Snake River reservoirs. Modeling simulations based on work in John Day Reservoir from 1982 through 1988 indicated that, if predator-size northern pikeminnow were exploited at a 10-20% rate, the resulting restructuring of their population could reduce their predation on juvenile salmonids by 50%. To test this hypothesis, we implemented a sport-reward angling fishery and a commercial longline fishery in the John Day Pool in 1990. We also conducted an angling fishery in areas inaccessible to the public at four dams on the mainstem Columbia River and at Ice Harbor Dam on the Snake River. Based on the success of these limited efforts, we implemented three test fisheries on a system-wide scale in 1991--a tribal longline fishery above Bonneville Dam, a sport-reward fishery, and a dam-angling fishery. Low catch of target fish and high cost of implementation resulted in discontinuation of the tribal longline fishery. However, the sport-reward and dam-angling fisheries were continued in 1992 and 1993. In 1992, we investigated the feasibility of implementing a commercial longline fishery in the Columbia River below Bonneville Dam and found that implementation of this fishery was also infeasible.

  8. The 1993 Finnish Interdisciplinary Seminar on SETI - A review of aims, approaches and conclusions

    Science.gov (United States)

    Seppanen, Jouko

    1993-10-01

    The communications of the International Interdisciplinary Seminar on SETI, held on March 6-7, 1993 in Vantaa, Finland, are reviewed and the contents and conclusions of papers summarized. The seminar was organized jointly by the Finnish Artificial Intelligence Society (FAIS), Finnish Astronomical Society, Ursa Astronomical Association and Heureka - The Finnish Science Centre. As the ninth in a series of intelligence-related seminars of FAIS, SETI was chosen as the topic for spring 1993, noting the new ten year NASA SETI program HRMS (High Resolution Micro-wave Survey), commenced on Columbus Day, October 12, 1992. The aims and the interdisciplinary format of the seminar are described, the main results and conclusions of papers are restated, and the seminar publications introduced. The summaries of papers are based on their abstracts and contain excerpts from texts.

  9. Invasieve infecties door beta-haemolytische Streptokokken Lancefield Groep A (Streptococcus pyogenes, GAS) in Nederland, 1992-1993

    NARCIS (Netherlands)

    Schellekens JFP; Schouls LM; van Silfhout A; Elzenaar CP; Brunings HA; Blokpoel MCJ; Top J; van Leeuwen WJ; LBA; MMB

    1994-01-01

    In recent years an increase of severe invasive infections and toxic shock syndrome (TSS) with beta-haemolytic Group A streptococci (Streptococcus pyogenes, GAS) has been reported from North-America and North-Western Europe. In the spring of 1992 several reports of cases suggested that this epidemic

  10. Geophysical investigations in the 100 Areas: Fiscal year 1991 through December 1993

    Science.gov (United States)

    Mitchell, T. H.

    1994-09-01

    The geophysical investigations identified in this document were conducted by the Westinghouse Hanford Company (WHC) Surface Geophysics Team, Geophysics Group, between October, 1991 and December, 1993. The investigations supported 100-Area activities for the Resource Conservation and Recovery Act of 1976 (RCRA) and the Comprehensive Environmental Response, Compensations and Liability Act of 1980 (CERCLA). The primary intent of this document is to provide a general map location and the associated document number for investigations that have been conducted as of December, 1993. The results of the individual investigations are not included here. The results of all of these investigations have been previously reported individually in WHC supporting documents. The investigations conducted during Fiscal Year (FY) 1992 are summarized in a single WHC document, WHC-SD-EN-TI-204, Rev. O. A brief summary of some of the successful applications of geophysics in the 100-Areas is included.

  11. Predicting recolonization patterns and interactions between potamodromous and anadromous salmonids in response to dam removal in the Elwha River, Washington State, USA

    Science.gov (United States)

    Brenkman, S.J.; Pess, G.R.; Torgersen, C.E.; Kloehn, K.K.; Duda, J.J.; Corbett, S.C.

    2008-01-01

    The restoration of salmonids in the Elwha River following dam removal will cause interactions between anadromous and potamodromous forms as recolonization occurs in upstream and downstream directions. Anadromous salmonids are expected to recolonize historic habitats, and rainbow trout (Oncorhynchus mykiss) and bull trout (Salvelinus confluentus) isolated above the dams for 90 years are expected to reestablish anadromy. We summarized the distribution and abundance of potamodromous salmonids, determined locations of spawning areas, and mapped natural barriers to fish migration at the watershed scale based on data collected from 1993 to 2006. Rainbow trout were far more abundant than bull trout throughout the watershed and both species were distributed up to river km 71. Spawning locations for bull trout and rainbow trout occurred in areas where we anticipate returning anadromous fish to spawn. Nonnative brook trout were confined to areas between and below the dams, and seasonal velocity barriers are expected to prevent their upstream movements. We hypothesize that the extent of interaction between potamodromous and anadromous salmonids will vary spatially due to natural barriers that will limit upstream-directed recolonization for some species of salmonids. Consequently, most competitive interactions will occur in the main stem and floodplain downstream of river km 25 and in larger tributaries. Understanding future responses of Pacific salmonids after dam removal in the Elwha River depends upon an understanding of existing conditions of the salmonid community upstream of the dams prior to dam removal.

  12. Potential effects of four Flaming Gorge Dam hydropower operational scenarios on riparian vegetation of the Green River, Utah and Colorado

    International Nuclear Information System (INIS)

    LaGory, K.E.; Van Lonkhuyzen, R.A.

    1995-06-01

    Four hydropower operational scenarios at Flaming Gorge Dam were evaluated to determine their potential effects on riparian vegetation along the Green River in Utah and Colorado. Data collected in June 1992 indicated that elevation above the river had the largest influence on plant distribution. A lower riparian zone occupied the area between the approximate elevations of 800 and 4,200-cfs flows--the area within the range of hydropower operational releases. The lower zone was dominated by wetland plants such as cattail, common spikerush, coyote willow, juncus, and carex. An upper riparian zone was above the elevation of historical maximum power plant releases from the dam (4,200 cfs), and it generally supported plants adapted to mesic, nonwetland conditions. Common species in the upper zone included box elder, rabbitbrush, grasses, golden aster, and scouring rush. Multispectral aerial videography of the Green River was collected in May and June 1992 to determine the relationship between flow and the areas of water and the riparian zone. From these relationships, it was estimated that the upper zone would decrease in extent by about 5% with year-round high fluctuation, seasonally adjusted high fluctuation, and seasonally adjusted moderate fluctuation, but it would increase by about 8% under seasonally adjusted steady flow. The lower zone would increase by about 13% for both year-round and seasonally adjusted high fluctuation scenarios but would decrease by about 40% and 74% for seasonally adjusted moderate fluctuation and steady flows, respectively. These changes are considered to be relatively minor and would leave pre-dam riparian vegetation unaffected. Occasional high releases above power plant capacity would be needed for long-term maintenance of this relict vegetation

  13. Investigation on the Causes of Cracking in Earth Dams (Case study: Mahmood-Abad Earth Dam

    Directory of Open Access Journals (Sweden)

    H. Rahimi

    2016-09-01

    Full Text Available Introduction: Cracking of earth dams is a one of the main threat causes of stability of embankment dams. In this research by modeling of the behavior of an embankment dam and employing conditions of the earthquake, the reasons of cracking were inspected using by modeling of earth dam behavior. Based on the literature, one of the main causes of dam failures is sliding and cracking of the dam structure during earthquake. Localized liquefaction of foundation soils was one of the causes of the observed post-earthquake distress within these dams. Material and Methods: In order to study the causes and the results of crack on earth dams, Mahmoodabad earthen dam with a height of 19 m, is located in Zanjan province, northwest of Iran, which suffered a longitudinal crack on the crest and slight sliding of the upstream slope due to 2001 Avaj earthquake was studied. This dam has faced earthquake two times with an interval of two years. During the first earthquake with the magnitude about 6.6 in Richter scale small longitudinal cracks had created on the crest. The developed cracks had been repaired by injecting the cement and then has been hidden by passing the time. After the second earthquake with the magnitude about 6.5 in Richter scale the hidden cracks had been appeared again and the slight movement of the upper slopes of dam reported. Based on the site investigation and documented information about dam, including maps and parameter data, the behavior of the dam has modeled by using Plaxis as a finite element model. In order to check the accuracy of the design of dam, the stability analysis has been conducted using by Xslope as a limit equilibrium model. The foundation conditions and the Geotechnical properties of the layer beneath the dam has been inspected by open excavation. Results and Discussion: Underground investigation about Geotechnical properties of dam foundation has showed that there is a thin sandy layer confined in alluvium material of the

  14. 1992-1993 Bonneville Appliance Efficiency Program: Showerhead evaluation. Volume I - report

    Energy Technology Data Exchange (ETDEWEB)

    Warwick, W.M.

    1995-01-01

    The Bonneville Power Administration (Bonneville) provides wholesale electric power to over 100 retail distribution utilities in the Pacific Northwest. Bonneville is faced with meeting growing loads from these utilities. It acquires conservation as one means of meeting this load growth. Bonneville has offered a variety of conservation programs since 1980. Efficient showerheads have been a feature in residential conservation programs ever since. Bonneville launched the Residential Appliance Efficiency Program to focus on water-heater energy conservation opportunities in 1992. The Residential Appliance Efficiency Program consists of two parts, a water-heater efficiency program, and a hot-water efficiency program. This report evaluates the savings and costs of the first two years of the showerhead portion of the Residential Appliance Efficiency Program (the showerhead program). Although it is not a formal evaluation of the program limited to implementation or a {open_quotes}process{close_quotes} evaluation, observations about program design and implementation are included as appropriate. Results of this evaluation are limited to program participants within the Bonneville service territory.

  15. Dynamic decision making for dam-break emergency management - Part 2: Application to Tangjiashan landslide dam failure

    Science.gov (United States)

    Peng, M.; Zhang, L. M.

    2013-02-01

    Tangjiashan landslide dam, which was triggered by the Ms = 8.0 Wenchuan earthquake in 2008 in China, threatened 1.2 million people downstream of the dam. All people in Beichuan Town 3.5 km downstream of the dam and 197 thousand people in Mianyang City 85 km downstream of the dam were evacuated 10 days before the breaching of the dam. Making such an important decision under uncertainty was difficult. This paper applied a dynamic decision-making framework for dam-break emergency management (DYDEM) to help rational decision in the emergency management of the Tangjiashan landslide dam. Three stages are identified with different levels of hydrological, geological and social-economic information along the timeline of the landslide dam failure event. The probability of dam failure is taken as a time series. The dam breaching parameters are predicted with a set of empirical models in stage 1 when no soil property information is known, and a physical model in stages 2 and 3 when knowledge of soil properties has been obtained. The flood routing downstream of the dam in these three stages is analyzed to evaluate the population at risk (PAR). The flood consequences, including evacuation costs, flood damage and monetized loss of life, are evaluated as functions of warning time using a human risk analysis model based on Bayesian networks. Finally, dynamic decision analysis is conducted to find the optimal time to evacuate the population at risk with minimum total loss in each of these three stages.

  16. Waste-Management Education and Research Consortium (WERC) annual progress report, 1992--1993. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    1993-02-15

    This report contains the following appendices: Appendix A - Requirements for Undergraduate Level; Appendix B - Requirements for Graduate Level; Appendix C - Graduate Degree In Environmental Engineeringat New Mexico State University; Appendix D - Non-degree Certificate program; Appendix E - Curriculum for Associate Degree Program in Radioactive & Hazardous Waste Materials; Appendix F - Curriculum for NCC Program in Earth & Environmental Sciences; Appendix G - Brochure of 1992 Teleconference Series; Appendix H - Sites for Hazardous/Radioactive Waste Management Series; Appendix I - WERC Interactive Television Courses; Appendix J - WERC Research Seminar Series Brochures; Appendix K - Summary of Technology Development of the Third Year; Appendix L - List of Major Publications Resulting From WERC; Appendix M - Types of Equipment at WERC Laboratories; and Appendix N - WERC Newsletter Examples.

  17. Status of ground-water resources at U.S. Navy Support Facility, Diego Garcia; summary of hydrologic and climatic data, January 1992 through December 1994

    Science.gov (United States)

    Torikai, J.D.

    1995-01-01

    This report contains hydrologic and climatic data that describe the status of ground-water resources at U.S. Navy Support Facility, Diego Garcia. Data presented are from January 1992 through December 1994. This report concentrates on data from October through December 1994, and references previous data from 1992 through 1994. Cumulative rainfall for October through December 1994 was 55 inches which is higher than the mean cumulative rainfall of about 31 inches for the same 3 months. Total rainfall for 1994 was 131 inches which is 24 percent higher than the mean annual rainfall of 106 inches. In com- parison, total rainfall in 1992 and 1993 were 93 inches and 95 inches, respectively. Ground-water withdrawal during October through December 1994 averaged 903,000 gallons per day, while the annual withdrawal in 1994 was 942,700 gallons per day. Annual withdrawals in 1992 and 1993 averaged 935,900 gallons per day and 953,800 gallons per day, respectively. At the end of December 1994, the chloride concentration of the composite water supply was 28 milligrams per liter, well below the 250 milligrams per liter secondary drinking-water standard established by the U.S. Environmental Protection Agency. Chloride concentrations of the composite water supply from October through December 1994 ranged between 28 and 86 milligrams per liter. Chloride concentration of ground water in monitoring wells at Cantonment and Air Operations decreased in November and December, and seems to have leveled off by the end of the year. Although chloride concen- trations have decreased during the fourth quarter of 1994, there has been a general trend of increasing chloride concentrations in the deeper monitoring wells since the 1992 dry season, which began in March 1992. A fuel leak at Air Operations caused the shutdown of ten wells in May 1991. Four of the wells resumed pumping for water-supply purposes in April 1992. The remaining six wells are being used to hydraulically contain and divert fuel

  18. EVALUASI KEAMANAN DAM JATILUHUR BERBASIS INDEKS RESIKO

    Directory of Open Access Journals (Sweden)

    Avazbek Ishbaev

    2014-12-01

    Full Text Available The dams have very important roles to agricultural activities. Especially, West Java with 240,000 hectares of agricultural land, needs a good dam structure that can be used sustainably. Jatiluhur dam in Purwakarta, West Java is one of big dams in Indonesia which has important rules not only for Purwakarta but also for Jakarta, Karawang and Bekasi residents. A study and observation about safety and dam stability is needed to prevent any damage. The purpose of this research were to identify parameters that influenced dam safety and to evaluate dam reliability based on index tools. Analysis was done using risk index tools. The result showed that the condition of the dam of Jatiluhur is still satisfied with indicators, "Idam"-750. The total index risk was 127.22 and the safety factor was 83.04 out of 100. Therefore, Jatiluhur dam could be classified as safe and no need for particular treatments. Jatiluhur dam can be operated in normal condition or abnormal condition with periodic monitoring. Keywords: dam safety, evaluation, Jatiluhur Dam, risk index tools

  19. Dam safety operating guidelines

    International Nuclear Information System (INIS)

    Elsayed, E.; Leung, T.; Kirkham, A.; Lum, D.

    1990-01-01

    As part of Ontario Hydro's dam structure assessment program, the hydraulic design review of several river systems has revealed that many existing dam sites, under current operating procedures, would not have sufficient discharge capacity to pass the Inflow Design Flood (IDF) without compromising the integrity of the associated structures. Typical mitigative measures usually considered in dealing with these dam sites include structural alterations, emergency action plans and/or special operating procedures designed for extreme floods. A pilot study was carried out for the Madawaska River system in eastern Ontario, which has seven Ontario Hydro dam sites in series, to develop and evaluate the effectiveness of the Dam Safety Operating Guidelines (DSOG). The DSOG consist of two components: the flood routing schedules and the minimum discharge schedules, the former of which would apply in the case of severe spring flood conditions when the maximum observed snowpack water content and the forecast rainfall depth exceed threshold values. The flood routing schedules would identify to the operator the optimal timing and/or extent of utilizing the discharge facilities at each dam site to minimize the potential for dam failures cased by overtopping anywhere in the system. It was found that the DSOG reduced the number of structures overtopped during probable maximum flood from thirteen to four, while the number of structures that could fail would be reduced from seven to two. 8 refs., 4 figs., 3 tabs

  20. Compilation of 1993 Annual Reports of the Navy ELF Communications System Ecological Monitoring Program

    Science.gov (United States)

    1994-04-01

    boundary consists of the smallest possible number of straight line segments (each S 20 a long) which connect or enclose the largest possible number of...killed and six heavily damaged by a severe windstorm (Mroz et al. 1993). This mortality appears to have reduced the amount of foliage in the canopy...In August, 1992, there was a severe windstorm at the control site with damage to a number of banded trees on the study plots. Most of the damage was

  1. Fiscal year 1993 well plugging and abandonment program, Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    This report is a synopsis of the progress of the well plugging and abandonment program at the Y-12 Plant, Oak Ridge, Tennessee, from December 1992 through August 20, 1993. A total of 70 wells and borings were plugged and abandoned during the period of time covered in this report. All wells and borings were plugged and abandoned in accordance with the Monitoring Well Plugging and Abandonment Plan for the US Department of Energy, Y-12 Plant, Oak Ridge, Tennessee (HSW, Inc. 1991).

  2. Dam risk reduction study for a number of large tailings dams in Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Verma, N. [AMEC Earth and Environmental Ltd., Mississauga, ON (Canada); Small, A. [AMEC Earth and Environmental Ltd., Fredericton, NB (Canada); Martin, T. [AMEC Earth and Environmental, Burnaby, BC (Canada); Cacciotti, D. [AMEC Earth and Environmental Ltd., Sudbury, ON (Canada); Ross, T. [Vale Inco Ltd., Sudbury, ON (Canada)

    2009-07-01

    This paper discussed a risk reduction study conducted for 10 large tailings dams located at a central tailings facility in Ontario. Located near large industrial and urban developments, the tailings dams were built using an upstream method of construction that did not involve beach compaction or the provision of under-drainage. The study provided a historical background for the dam and presented results from investigations and instrumentation data. The methods used to develop the dam configurations were discussed, and remedial measures and risk assessment measures used on the dams were reviewed. The aim of the study was to address key sources of risk, which include the presence of high pore pressures and hydraulic gradients; the potential for liquefaction; slope instability; and the potential for overtopping. A borehole investigation was conducted and piezocone probes were used to obtain continuous data and determine soil and groundwater conditions. The study identified that the lower portion of the dam slopes were of concern. Erosion gullies could lead to larger scale failures, and elevated pore pressures could lead to the risk of seepage breakouts. It was concluded that remedial measures are now being conducted to ensure slope stability. 6 refs., 1 tab., 6 figs.

  3. Environmental parameters monitoring in Comacchio wetland; Progetto per lo studio integrato delle Valli di Comacchio : eutrofizzazione delle Valli di Comacchio. Campagne di misura sulla qualita` delle acque 1992-1993

    Energy Technology Data Exchange (ETDEWEB)

    Barilli, L.; Malaguti, A.; Mazzone, N.; Olivieri, P.; Silingardi, D.; Tesini, E. [ENEA, Centro Ricerche `E. Clementel`, Bologna (Italy). Dip. Ambiente; Lorenzelli, R.; Salvi, S. [ENEA, Centro Ricerche Brasimone, Bologna (Italy). Dip. Ambiente

    1995-12-01

    From april 1992 to april 1993, a monthly monitoring of the environmental parameters has been carried out in the waters of the Comacchio wetland, in order to study the trends of their tropic level, and to evaluate the connections among the chemical physical parameters, the primary productivity, the seaweed turnover and the nutrients in the water column. The field campaigns, 12 in total, have been performed in two stations, representative of wetland; besides, 5 seasonal campaigns have been made over the whole lagoon, in 15 stations, and in the 3 sea channels. The seasonal trends show very high values of temperature and salinity, up to 50% in summer; even if the values of the chlorophyll `a` are less in comparison with the 1990-1991 values, the waters are classified as eutrophic over all the year, as confirmed by the results of primary productivity and seaweed turnover measurements. Phosphorus seems to be the limiting factor, even if in summer the nitrogen also is nearly missing. Very high productivity, with the oxygen concentration in the water higher than the saturation value, is observed in summer.

  4. The Effects of Dams on Downstream Channel Characteristics in Pennsylvania and Maryland: Assessing the Potential Consequences of Dam Removal

    Science.gov (United States)

    Skalak, K. J.; Pizzuto, J. E.; Jenkins, P.

    2003-12-01

    The potential downstream effects of dam removal were assessed on fifteen sites of varying dam size and characteristics in Pennsylvania and Maryland. The dams ranged in size from a 30 cm high fish weir to a water supply dam 57 m high. Stream order ranged from 1 to 4. The dams are located in watersheds with varying degrees of human disturbance and urbanization. The dams are also operated differently, with significant consequences for hydraulic residence time and downstream flow variability. Most streams were alluvial, but 6 of the reaches were clearly bedrock channels. We hypothesize that the channel upstream, which is unaffected by the dam, will provide an accurate model for the channel downstream of the dam long after dam removal. Therefore, reaches upstream and downstream of the dam were compared to determine the effects of the dam as well as the condition of the stream that will ultimately develop decades after dam removal. Surprisingly, the dams had no consistent influence on channel morphology. However, the percentage of sand is significantly lower downstream than upstream: the mean % sand downstream is 11.47%, while the mean % sand upstream is 21.39%. The coarser fractions of the bed, as represented by the 84th percentile grain diameter, are unaffected by the presence of the dam. These results imply that decades after dam removal, the percentage of sand on the bed will increase, but the coarse fraction of the bed will remain relatively unchanged.

  5. Public safety around dams guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, T [Canadian Dam Association, Edmonton, AB (Canada)

    2010-07-01

    This presentation discussed Canadian and international initiatives for improving dam safety and described some of the drivers for the development of new Canadian Dam Association (CDA) public safety guidelines for dams. The CDA guidelines were divided into the following 3 principal sections: (1) managed system elements, (2) risk assessment and management, and (3) technical bulletins. Public and media responses to the drownings have called for improved safety guidelines. While the public remains unaware of the hazards of dams, public interaction with dams is increasing as a result of interest in extreme sports and perceived rights of access. Guidelines are needed for dam owners in order to provide due diligence. Various organizations in Canada are preparing technical and public safety dam guidelines. CDA guidelines have also been prepared for signage, booms and buoys, and audible and visual alerts bulletins. Working groups are also discussing recommended practices for spill procedures, spillways and the role of professional engineers in ensuring public safety. Methods of assessing risk were also reviewed. Managed system elements for risk assessment and public interactions were also discussed, and stepped control measures were presented. tabs., figs.

  6. Odelouca Dam Construction: Numerical Analysis

    OpenAIRE

    Brito, A.; Maranha, J. R.; Caldeira, L.

    2012-01-01

    Odelouca dam is an embankment dam, with 76 m height, recently constructed in the south of Portugal. It is zoned with a core consisting of colluvial and residual schist soil and with soil-rockfill mixtures making up the shells (weathered schist with a significant fraction of coarse sized particles). This paper presents a numerical analysis of Odelouca Dam`s construction. The material con-stants of the soil model used are determined from a comprehensive testing programme carried out in the C...

  7. The Budget of the United States Government. Department of Defense Budget for Fiscal Years 1992 and 1993

    Science.gov (United States)

    1991-02-04

    facility will treat raw sewage discharges from Tijuana into the Tijuana River. These discharges have severely affected a National Wildlife Refuge and...partnership among government, academic, and private sector scientists to develop new medica - tions for the treatment of drug addiction. The 1992 proposal

  8. Effect of a dam on epilithic algal communities of a mountain stream: before-after dam construction comparison

    Directory of Open Access Journals (Sweden)

    Luciana Cibils Martina

    2013-02-01

    Full Text Available In this study we evaluated the effect of a dam on epilithic algal communities by analyzing community response after dam construction and by comparing community composition, structure and biomass upstream and downstream of the dam. Samples of epilithic algae and environmental data were collected at each site during high and low water periods before and after dam construction in Achiras Stream (Córdoba, Argentina. Ordinations showed modifications in algal assemblages after dam construction and downstream of the dam. Ordinations also suggested a loss of seasonality at the downstream site since the assemblages were similar between hydrological periods after dam construction. Indicator species, obtained by the Indicator Value method, showed that, after dam construction, there could have been an increase in nutrient concentration and a release of plankton from the impoundment. Abundance, richness and diversity were altered after dam construction as assessed by ANOVAs derived from a modified BACI Design. Proportion of early-successional species was higher at the upstream site while late-successional species were dominant at the downstream site, as predicted. Lower fluctuations in discharge downstream of the dam may have helped succession advance, whereas at the upstream site, mainly during the high water period, floods could have caused sloughing of life forms from the outer layers of the biofilm, resetting the algal community to early successional stages. It may be concluded that the dam affected algal community and favored succession advance mainly by reducing current velocity and flow fluctuations.

  9. The use of algae in monitoring discharges of radionuclides. Experiences from the 1992 and 1993 monitoring programmes at the Swedish nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Snoeijs, P. [Uppsala Univ. (Sweden). Dept. of Ecological Botany; Simenstad, P. [Swedish Radiation Protection Inst., Stockholm (Sweden)

    1995-01-01

    All four Swedish nuclear power plants (Forsmark, Oskarshamn, Barsebaeck and Ringhals) use brackish water as coolant (Baltic Sea and Swedish west coast). Radionuclides are discharged together with the cooling water. The gamma spectra of monthly algal samples harvested in 1992 and 1993 close to the discharge points of these power plants were determined within the routine monitoring programmes. The main radionuclides detected in the algal samples were {sup 54}Mn, {sup 58}Co, {sup 60}Co and {sup 137}Cs. Most {sup 137}Cs in the samples from the northern Baltic Sea (Forsmark) still originated from the 1986 Chernobyl accident. Other radionuclides, notably {sup 51}Cr, {sup 65}Zn, {sup 95}Zr, {sup 95}Nb, {sup 110m}Ag, {sup 124}b, {sup 125}Sb and {sup 134}Cs, were regularly detected at s of the sites. Transfer factors from discharge to algae were generally in the order of 0.3-3 Bq kg{sup -1} per MBq discharge. For the major discharged radionuclides, significant linear relationships were in most cases found between discharges and concentrations in algal samples. Differences in transfer factors and regression coefficients were explained by location of the sampling sites and type of radionuclide. It is concluded that algal samples provide useful complements to water and sediment samples in the monitoring programmes since radionuclide concentrations are much higher in algal samples and proportional to the discharges. 21 refs, figs.

  10. 78 FR 77397 - Flood Control Regulations, Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas

    Science.gov (United States)

    2013-12-23

    ... Regulations, Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas AGENCY: U.S. Army Corps... Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas. In 1997, the Lower Colorado River... regulations to reflect changes in ownership and responsibilities of flood control management of Marshall Ford...

  11. 7 CFR 1724.55 - Dam safety.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Dam safety. 1724.55 Section 1724.55 Agriculture... § 1724.55 Dam safety. (a) The provisions of this section apply only to RUS financed electric system... for Dam Safety,”(Guidelines), as applicable. A dam, as more fully defined in the Guidelines, is...

  12. New guidelines for dam safety classification

    International Nuclear Information System (INIS)

    Dascal, O.

    1999-01-01

    Elements are outlined of recommended new guidelines for safety classification of dams. Arguments are provided for the view that dam classification systems should require more than one system as follows: (a) classification for selection of design criteria, operation procedures and emergency measures plans, based on potential consequences of a dam failure - the hazard classification of water retaining structures; (b) classification for establishment of surveillance activities and for safety evaluation of dams, based on the probability and consequences of failure - the risk classification of water retaining structures; and (c) classification for establishment of water management plans, for safety evaluation of the entire project, for preparation of emergency measures plans, for definition of the frequency and extent of maintenance operations, and for evaluation of changes and modifications required - the hazard classification of the project. The hazard classification of the dam considers, as consequence, mainly the loss of lives or persons in jeopardy and the property damages to third parties. Difficulties in determining the risk classification of the dam lie in the fact that no tool exists to evaluate the probability of the dam's failure. To overcome this, the probability of failure can be substituted for by a set of dam characteristics that express the failure potential of the dam and its foundation. The hazard classification of the entire project is based on the probable consequences of dam failure influencing: loss of life, persons in jeopardy, property and environmental damage. The classification scheme is illustrated for dam threatening events such as earthquakes and floods. 17 refs., 5 tabs

  13. 33 CFR 208.19 - Marshall Ford Dam and Reservoir (Mansfield Dam and Lake Travis), Colorado River, Tex.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Marshall Ford Dam and Reservoir... Marshall Ford Dam and Reservoir (Mansfield Dam and Lake Travis), Colorado River, Tex. The Secretary of the Interior, through his agent, the Lower Colorado River Authority (LCRA) shall operate the Marshall Ford Dam...

  14. Northern hemisphere total ozone values from 1989-1993 determined with the NOAA-11 Solar Backscatter Ultraviolet (SBUV/2) instrument

    Science.gov (United States)

    Planet, W. G.; Lienesch, J. H.; Miller, A. J.; Nagatani, R.; Mcpeters, R. D.; Hilsenrath, E.; Cebula, R. P.; Deland, M. T.; Wellemeyer, C. G.; Horvath, K.

    1994-01-01

    Determinations of global total ozone amounts have been made from recently reprocessed measurements with the SBUV/2 on the NOAA-11 environmental satellite since January 1989. This data set employs a new algorithm and an updated calibration. Comparisons with total ozone amounts derived from a significant subset of the global network of Dobson spectrophotometers shows a 0.3% bias between the satellite and ground measurements for the period January 1989-May 1993. Comparisons with the data from individual stations exhibit differing degrees of agreement which could be due to the matchup procedures and also to the uncertainties in the Dobson data. The SBUV/2 data set discussed here traces the Northern Hemisphere total ozone from 1989 to the present, showing a marked decrease from the average of those years starting in the summer of 1992 and continuing into 1993, with an apparent returning to more normal levels in late 1993.

  15. Excavation of the Surikamigawa dam diversion tunnel. Surikamigawa dam karihaisui tunnel kantsu

    Energy Technology Data Exchange (ETDEWEB)

    Ikeda, T.; Konno, T. (Ministry of Construction, Tokyo (Japan))

    1994-04-01

    A bypass tunnel construction has been completed at the Surikamigawa dam (Japan). This paper describes the summary of the construction. The full-swing dam construction work is scheduled to begin in 1995. The soils distributed near the dam site consist of lapillus tuff containing andesite-based light stones and tuff-based conglomerates containing large gravels. Excavation of the dam diversion tunnel has used a blasting method, and the tunnel construction has adopted an automatic tunnel cross section marking system and a non-electric explosion method. This marking system is a system to irradiate a laser beam onto the facing to depict excavation lines that realizes labor saving and high-accuracy excavation. The error at the tunnel completion was found 20 mm. The non-electric explosion method ignites a coated explosive layer with an impact wave, which is electrostatically safe, and reduces blasting vibration. Electric detonators have also been used because of using ANFO explosives. The result obtained from measurements of inner space displacement necessary for the blasting process has indicated that the area near the dam site consists of stable mountains. 6 figs., 4 tabs.

  16. Three Sisters Dam modifications and performance

    Energy Technology Data Exchange (ETDEWEB)

    Courage, L.J.R. [Monenco AGRA Inc., Calgary, AB (Canada)

    1995-12-31

    Recent modifications and maintenance carried out at the Three Sisters Dam, in the Alberta Rockies south of the town of Canmore, were described. A detailed account was given of the dam`s geological setting, its abnormally high leakage through the foundation and its sinkhole activity. Results of studies aimed at finding the cause of leakage and sinkhole occurrences were reviewed. Modifications made to the dam since 1951 were detailed, as were modifications to handle probable maximum flood levels. Three approaches for estimating failure probabilities after identification of failure modes were described. The overall conclusion was that based on constant leakage, no settlement in the dam, penstocks, or the powerhouse since construction, the Three Sisters Dam was stable. 1 ref.

  17. Dams and Levees: Safety Risks

    Science.gov (United States)

    Carter, N. T.

    2017-12-01

    The nation's flood risk is increasing. The condition of U.S. dams and levees contributes to that risk. Dams and levee owners are responsible for the safety, maintenance, and rehabilitation of their facilities. Dams-Of the more than 90,000 dams in the United States, about 4% are federally owned and operated; 96% are owned by state and local governments, public utilities, or private companies. States regulate dams that are not federally owned. The number of high-hazard dams (i.e., dams whose failure would likely result in the loss of human life) has increased in the past decade. Roughly 1,780 state-regulated, high-hazard facilities with structural ratings of poor or unsatisfactory need rehabilitation. Levees-There are approximately 100,000 miles of levees in the nation; most levees are owned and maintained by municipalities and agricultural districts. Few states have levee safety programs. The U.S. Army Corps of Engineers (Corps) inspects 15,000 miles of levees, including levees that it owns and local levees participating in a federal program to assist with certain post-flood repairs. Information is limited on how regularly other levees are inspected. The consequence of a breach or failure is another aspect of risk. State and local governments have significant authority over land use and development, which can shape the social and economic impacts of a breach or failure; they also lead on emergency planning and related outreach. To date, federal dam and levee safety efforts have consisted primarily of (1) support for state dam safety standards and programs, (2) investments at federally owned dams and levees, and (3) since 2007, creation of a national levee database and enhanced efforts and procedures for Corps levee inspections and assessments. In Public Law 113-121, enacted in 2014, Congress (1) directed the Corps to develop voluntary guidelines for levee safety and an associated hazard potential classification system for levees, and (2) authorized support for the

  18. Health impacts of large dams

    International Nuclear Information System (INIS)

    Lerer, L.B.

    1999-01-01

    Large dams have been criticized because of their negative environmental and social impacts. Public health interest largely has focused on vector-borne diseases, such as schistosomiasis, associated with reservoirs and irrigation projects. Large dams also influence health through changes in water and food security, increases in communicable diseases, and the social disruption caused by construction and involuntary resettlement. Communities living in close proximity to large dams often do not benefit from water transfer and electricity generation revenues. A comprehensive health component is required in environmental and social impact assessments for large dam projects

  19. Deformation performance of Waba Dam

    Energy Technology Data Exchange (ETDEWEB)

    Salloum, T.; Bhardwaj, V.; Hassan, P. [Ontario Power Generation, Niagara-on-the-Lake, ON (Canada); Cragg, C. [Cragg Consulting Services, Toronto, ON (Canada)

    2009-07-01

    This paper described the performance of the Waba Dam which is being monitored as part of Ontario Power Generation's Dam Safety Program. It described the deformations that have been observed in this 3600 ft long earthfill dam which lies on marine clay in eastern Ontario. An extensive instrumentation program, including foundation settlement gauges, surface monuments, slope inclinometers, load cells and piezometers has been in effect since the construction of the dam in 1975. Significant settlement has occurred at Waba Dam since its construction. Wide berms were provided upstream and downstream beyond the slopes of the main fill to ensure stability of the dyke on the soft clay foundation and the crest elevations were designed to allow for the expected settlement in the foundation which would be overstressed by the dam loading. Based on current settlements, future settlements are predicted based on Asaoka's method. Inclinometer measurements have shown a foundation lateral spreading of 12 in. The lateral versus vertical deformations were found to be comparable to well behaving embankments reported in the literature. These analyses indicate that Waba Dam is performing well and should continue to perform well into the future. 8 refs., 1 tab., 14 figs.

  20. DAM-LAKEFRONT PLAZA: Revitalization of an Agriculture Reservoir Dam in Kashar-Tirana/Albania

    Directory of Open Access Journals (Sweden)

    Valbona Koçi

    2014-12-01

    Full Text Available The Dam-Lakefront Plaza in Kashar-Tirana/Albania is a research project that proposes not only the re-consideration and reinforcement of the artificial Reservoirs Dams built during Socialism in Albania, but envisions the maintenance of dams and revitalization of the lakeside area promoting the public-private collaboration. In addition, it envisions the generation of qualitative and lively public spaces in sub-urban areas as well. Admitting the artificial lakes as specific nodes of man-made infrastructure in the landscape, and consequently the dams (together with the drainage channels as important hydrotechnic elements of the flood protection infrastructure, this research intends to elaborate on one type of landscape infrastructure - the vertical screens, offering a mediation between the natural and built landscape.

  1. Effects of Hydroelectric Dam Operations on the Restoration Potential of Snake River Fall Chinook Salmon (Oncorhynchus tshawytscha) Spawning Habitat Final Report, October 2005 - September 2007.

    Energy Technology Data Exchange (ETDEWEB)

    Hanrahan, Timothy P.; Richmond, Marshall C.; Arntzen, Evan V. [Pacific Northwest National Laboratory

    2007-11-13

    suitability criteria to measured and modeled habitat data from the Snake River study areas. Channel morphology data from the Wanapum reference reach and the Snake River study areas were evaluated to identify geomorphically suitable fall Chinook salmon spawning habitat. The results of this study indicate that a majority of the Ice Harbor and Lower Granite study areas contain suitable fall Chinook salmon spawning habitat under existing hydrosystem operations. However, a large majority of the currently available fall Chinook salmon spawning habitat in the Ice Harbor and Lower Granite study areas is of low quality. The potential for increasing, through modifications to hydrosystem operations (i.e., minimum pool elevation of the next downstream dam), the quantity or quality of fall Chinook salmon spawning habitat appears to be limited. Estimates of the amount of potential fall Chinook salmon spawning habitat in the Ice Harbor study area decreased as the McNary Dam forebay elevation was lowered from normal to minimum pool elevation. Estimates of the amount of potential fall Chinook salmon spawning habitat in the Lower Granite study area increased as the Little Goose Dam forebay elevation was lowered from normal to minimum pool elevation; however, 97% of the available habitat was categorized within the range of lowest quality. In both the Ice Harbor and Lower Granite study areas, water velocity appears to be more of a limiting factor than water depth for fall Chinook salmon spawning habitat, with both study areas dominated by low-magnitude water velocity. The geomorphic suitability of both study areas appears to be compromised for fall Chinook salmon spawning habitat, with the Ice Harbor study area lacking significant bedforms along the longitudinal thalweg profile and the Lower Granite study area lacking cross-sectional topographic diversity. To increase the quantity of available fall Chinook salmon spawning habitat in the Ice Harbor and Lower Granite study area, modifications to

  2. Hanford Site ground-water monitoring for 1993

    International Nuclear Information System (INIS)

    Dresel, P.E.; Luttrell, S.P.; Evans, J.C.

    1994-09-01

    This report presents the results of the Ground-Water Surveillance Project monitoring for calendar year 1993 on the Hanford Site, Washington. Hanford Site operations from 1943 onward produced large quantities of radiological and chemical waste that have impacted ground-water quality on the Site. Monitoring of water levels and ground-water chemistry is performed to track the extent of contamination and trends in contaminant concentrations. The 1993 monitoring was also designed to identify emerging ground-water quality problems. The information obtained is used to verify compliance with applicable environmental regulations and to evaluate remedial actions. Data from other monitoring and characterization programs were incorporated to provide an integrated assessment of Site ground-water quality. Additional characterization of the Site's geologic setting and hydrology was performed to support the interpretation of contaminant distributions. Numerical modeling of sitewide ground-water flow also supported the overall project goals. Water-level monitoring was performed to evaluate ground-water flow directions, to track changes in water levels, and to relate such changes to changes in site disposal practices. Water levels over most of the Hanford Site continued to decline between June 1992 and June 1993. The greatest declines occurred in the 200-West Area. These declines are part of the continued response to the cessation of discharge to U Pond and other disposal facilities. The low permeability in this area which enhanced mounding of waste-water discharge has also slowed the response to the reduction of disposal. Water levels remained nearly constant in the vicinity of B Pond, as a result of continued disposal to the pond. Water levels measured from wells in the unconfined aquifer north and east of the Columbia River indicate that the primary source of recharge is irrigation practices

  3. Hanford Site ground-water monitoring for 1993

    Energy Technology Data Exchange (ETDEWEB)

    Dresel, P.E.; Luttrell, S.P.; Evans, J.C. [and others

    1994-09-01

    This report presents the results of the Ground-Water Surveillance Project monitoring for calendar year 1993 on the Hanford Site, Washington. Hanford Site operations from 1943 onward produced large quantities of radiological and chemical waste that have impacted ground-water quality on the Site. Monitoring of water levels and ground-water chemistry is performed to track the extent of contamination and trends in contaminant concentrations. The 1993 monitoring was also designed to identify emerging ground-water quality problems. The information obtained is used to verify compliance with applicable environmental regulations and to evaluate remedial actions. Data from other monitoring and characterization programs were incorporated to provide an integrated assessment of Site ground-water quality. Additional characterization of the Site`s geologic setting and hydrology was performed to support the interpretation of contaminant distributions. Numerical modeling of sitewide ground-water flow also supported the overall project goals. Water-level monitoring was performed to evaluate ground-water flow directions, to track changes in water levels, and to relate such changes to changes in site disposal practices. Water levels over most of the Hanford Site continued to decline between June 1992 and June 1993. The greatest declines occurred in the 200-West Area. These declines are part of the continued response to the cessation of discharge to U Pond and other disposal facilities. The low permeability in this area which enhanced mounding of waste-water discharge has also slowed the response to the reduction of disposal. Water levels remained nearly constant in the vicinity of B Pond, as a result of continued disposal to the pond. Water levels measured from wells in the unconfined aquifer north and east of the Columbia River indicate that the primary source of recharge is irrigation practices.

  4. Evolution of the sensor fish device for measuring physical conditions in sever hydraulic environments

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Duncan, J. P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2003-03-01

    To assist in deriving biological specifications for design of turbine rehabilitation measures, new “fish-friendly” turbines, and spillway designs and operations, Pacific Northwest National Laboratory (PNNL) scientists have developed and tested an autonomous multi-sensor device called a Sensor Fish that can acquire pressure and tri-axial linear acceleration data during passage through severe hydraulic conditions. The purpose of the Sensor Fish is to characterize physical conditions fish experience during passage through hydro turbines, spill stilling basins, high-discharge outfalls, and other dam passage routes. This report discusses the development and field tests of the Sensor Fish at Rock Island, McNary, The Dalles, Bonneville, and Wanapum dams on the Columbia River and the Prosser Irrigation District on the Yakima River, which have shown that the device can withstand the severe environments of turbine, spill, and fish bypass passage and provide useful environmental data that can ultimately aid in the design and operation of new and existing turbines, spill, and dam fish bypass facilities.

  5. Total System Performance Assessment, 1993: An evaluation of the potential Yucca Mountain repository

    International Nuclear Information System (INIS)

    Andrews, R.W.; Dale, T.F.; McNeish, J.A.

    1994-03-01

    Total System Performance Assessments are an important component in the evaluation of the suitability of Yucca Mountain, Nevada as a potential site for a mined geologic repository for the permanent disposal of high-level radioactive wastes in the United States. The Total System Performance Assessments are conducted iteratively during site characterization to identify issues which should be addressed by the characterization and design activities as well as providing input to regulatory/licensing and programmatic decisions. During fiscal years 1991 and 1992, the first iteration of Total System Performance Assessment (hereafter referred to as TSPA 1991) was completed by Sandia National Laboratories and Pacific Northwest Laboratory. Beginning in fiscal year 1993, the Civilian Radioactive Waste Management System Management and Operating Contractor was assigned the responsibility to plan, coordinate, and contribute to the second iteration of Total System Performance Assessment (hereafter referred to as TSPA 1993). This document presents the objectives, approach, assumptions, input, results, conclusions, and recommendations associated with the Management and Operating Contractor contribution to TSPA 1993. The new information incorporated in TSPA 1993 includes (1) revised estimates of radionuclide solubilities (and their thermal and geochemical dependency), (2) thermal and geochemical dependency of spent fuel waste alteration and glass dissolution rates, (3) new distribution coefficient (k d ) estimates, (4) revised estimates of gas-phase velocities and travel times, and (5) revised hydrologic modeling of the saturated zone which provides updated estimates of the advective flux through the saturated zone

  6. Total System Performance Assessment, 1993: An evaluation of the potential Yucca Mountain repository

    Energy Technology Data Exchange (ETDEWEB)

    Andrews, R.W.; Dale, T.F.; McNeish, J.A.

    1994-03-01

    Total System Performance Assessments are an important component in the evaluation of the suitability of Yucca Mountain, Nevada as a potential site for a mined geologic repository for the permanent disposal of high-level radioactive wastes in the United States. The Total System Performance Assessments are conducted iteratively during site characterization to identify issues which should be addressed by the characterization and design activities as well as providing input to regulatory/licensing and programmatic decisions. During fiscal years 1991 and 1992, the first iteration of Total System Performance Assessment (hereafter referred to as TSPA 1991) was completed by Sandia National Laboratories and Pacific Northwest Laboratory. Beginning in fiscal year 1993, the Civilian Radioactive Waste Management System Management and Operating Contractor was assigned the responsibility to plan, coordinate, and contribute to the second iteration of Total System Performance Assessment (hereafter referred to as TSPA 1993). This document presents the objectives, approach, assumptions, input, results, conclusions, and recommendations associated with the Management and Operating Contractor contribution to TSPA 1993. The new information incorporated in TSPA 1993 includes (1) revised estimates of radionuclide solubilities (and their thermal and geochemical dependency), (2) thermal and geochemical dependency of spent fuel waste alteration and glass dissolution rates, (3) new distribution coefficient (k{sub d}) estimates, (4) revised estimates of gas-phase velocities and travel times, and (5) revised hydrologic modeling of the saturated zone which provides updated estimates of the advective flux through the saturated zone.

  7. Fragility Analysis of Concrete Gravity Dams

    Science.gov (United States)

    Tekie, Paulos B.; Ellingwood, Bruce R.

    2002-09-01

    Concrete gravity dams are an important part ofthe nation's infrastructure. Many dams have been in service for over 50 years, during which time important advances in the methodologies for evaluation of natural phenomena hazards have caused the design-basis events to be revised upwards, in some cases significantly. Many existing dams fail to meet these revised safety criteria and structural rehabilitation to meet newly revised criteria may be costly and difficult. A probabilistic safety analysis (PSA) provides a rational safety assessment and decision-making tool managing the various sources of uncertainty that may impact dam performance. Fragility analysis, which depicts fl%e uncertainty in the safety margin above specified hazard levels, is a fundamental tool in a PSA. This study presents a methodology for developing fragilities of concrete gravity dams to assess their performance against hydrologic and seismic hazards. Models of varying degree of complexity and sophistication were considered and compared. The methodology is illustrated using the Bluestone Dam on the New River in West Virginia, which was designed in the late 1930's. The hydrologic fragilities showed that the Eluestone Dam is unlikely to become unstable at the revised probable maximum flood (PMF), but it is likely that there will be significant cracking at the heel ofthe dam. On the other hand, the seismic fragility analysis indicated that sliding is likely, if the dam were to be subjected to a maximum credible earthquake (MCE). Moreover, there will likely be tensile cracking at the neck of the dam at this level of seismic excitation. Probabilities of relatively severe limit states appear to be only marginally affected by extremely rare events (e.g. the PMF and MCE). Moreover, the risks posed by the extreme floods and earthquakes were not balanced for the Bluestone Dam, with seismic hazard posing a relatively higher risk.

  8. Ground-water data for the Nevada Test Site and selected other areas in South-Central Nevada, 1992--1993

    International Nuclear Information System (INIS)

    1995-01-01

    The US Geological Survey, in support of the US Department of Energy Environmental Restoration and Hydrologic Resources Management Programs, collects and compiles hydrogeologic data to aid in characterizing the regional and local ground-water flow systems underlying the Nevada Test Site and vicinity. This report presents selected ground-water data collected from wells and test holes at and in the vicinity of the Nevada Test Site. Depth-to-water measurements were made during water year 1993 at 55 sites at the Nevada Test Site and 43 regional sites in the vicinity of the Nevada Test Site. Depth to water ranged from 87.7 to 674.6 meters below land surface at the Nevada Test Site and from 6.0 to 444.7 meters below land surface at sites in the vicinity of the Nevada Test Site. Depth-to-water measurements were obtained using the wire-line, electric-tape, air-line, and steel-tape devices. Total measured ground-water withdrawal from the Nevada Test Site during the 1993 calendar year was 1,888.04 million liters. Annual ground-water withdrawals from 14 wells ranged from 0.80 million to 417.20 million liters. Tritium concentrations from four samples at the Nevada Test Site and from three samples in the vicinity of the Nevada Test Site collected during water year 1993 ranged from near 0 to 27,676.0 becquerels per liter and from near 0 to 3.9 becquerels per liter, respectively

  9. Princeton Plasma Physics Laboratory (PPPL) annual site environmental report for calendar year 1993

    International Nuclear Information System (INIS)

    Finley, V.L.; Wiezcorek, M.A.

    1995-01-01

    This report gives the results of the environmental activities and monitoring programs at the Princeton Plasma Physics Laboratory (PPPL) for CY93. The report is prepared to provide the U.S. Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants, if any, added to the environment as a result of PPPL operations, as well as environmental initiatives, assessments, and programs that were undertaken in 1993. The objective of the Annual Site Environmental Report is to document evidence that DOE facility environmental protection programs adequately protect the environment and the public health. The Princeton Plasma Physics Laboratory has engaged in fusion energy research since 1951. The long-range goal of the U.S. Magnetic Fusion Energy Research Program is to develop and demonstrate the practical application of fusion power as an alternate energy source. In 1993, PPPL had both of its two large tokamak devices in operation; the Tokamak Fusion Test Reactor (TFTR) and the Princeton Beta Experiment-Modification (PBX-M). PBX-M completed its modifications and upgrades and resumed operation in November 1991. TFTR began the deuterium-tritium (D-T) experiments in December 1993 and set new records by producing over six million watts of energy. The engineering design phase of the Tokamak Physics Experiment (TPX), which replaced the cancelled Burning Plasma Experiment in 1992 as PPPL's next machine, began in 1993 with the planned start up set for the year 2001. In 1993, the Environmental Assessment (EA) for the TFRR Shutdown and Removal (S ampersand R) and TPX was prepared for submittal to the regulatory agencies

  10. The role of dams in development

    International Nuclear Information System (INIS)

    Cakmak, C.

    2001-01-01

    Although the amounts of water resources are enough for the entire world, the distribution of them in time and space shows uneven pattern. The water need is increasing with heavy industrial and agricultural requirements, while available water in the world remains as a fixed source. Economic growth, socio-cultural, and environmental developments are being realized following these changes. In order to achieve sustainable management of water resources, these changes have to be taken into consideration in water-related development projects. Demand for water is steadily increasing through out the world, even though the fresh water resources are limited and unevenly distributed, during the past three centuries, the amount of water withdrawn from fresh water resources has increased by a factor of 35, whereas world population by a factor 8. The engineering of dams, which provides regular water from reservoirs of dams to be used in case of demand pattern, is a vital part of the civilization. Dams have played a key rote in the development since the third millennium B C when the first great civilizations evolved on major rivers, such as Tigris-Euphrates, the Nile and the Indus. From these early times dams were built for flood control, water supply, irrigation and navigation. Dams also had been built to produce motive power and electricity since the industrial revolution. Development priorities changed, experience accumulated with the construction and operation of dams. Although the importance of water is well known in the human life and civilization around the world, still various groups argue that expected economic benefits are not being produced and that major environmental, economic and social costs are not being taken into account. By the end of 20th century, there were 45000 large dams in over 150 countries. According to the same classification there are 625 large dams in Turkey. All over the world, 50 % of the large dams were built mainly for irrigation. It is estimated

  11. Matahina Dam : lessons learned from an earthquake-related internal erosion incident at the Matahina Dam, New Zealand

    Energy Technology Data Exchange (ETDEWEB)

    Gillon, M. [Damwatch Services Ltd., Wellington (New Zealand)

    2009-07-01

    This case history discussed internal erosion damage and crest subsidence caused by an earthquake at the Matahina Dam in New Zealand. The study showed that cracking and internal erosion was initiated during the 1967 reservoir filling operation. Located in an area of active volcanism and faulting, the dam is located on a river with extensive erosion through an ignimbrite flow. The dam's core is founded on compact Tertiary age sediments overlain by sand and gravel deposits beneath the shoulders of the dam. The earthquake caused a rupture along an unidentified fault trace 12 km from the dam. The horizontal base acceleration recorded at the dam was 3.25 m/s. Transverse cracking was observed at each abutment, and deformations were observed in the rockfill. An investigation program was conducted to determine the dam's integrity. Piezometer measurements showed widespread fluctuations. It was concluded that the lack of an effective filter was a significant design omission. 12 refs., 12 figs.

  12. Dam-breach analysis and flood-inundation mapping for selected dams in Oklahoma City, Oklahoma, and near Atoka, Oklahoma

    Science.gov (United States)

    Shivers, Molly J.; Smith, S. Jerrod; Grout, Trevor S.; Lewis, Jason M.

    2015-01-01

    Dams provide beneficial functions such as flood control, recreation, and storage of water supplies, but they also entail risk; dam breaches and resultant floods can cause substantial property damage and loss of life. The State of Oklahoma requires each owner of a high-hazard dam, which the Federal Emergency Management Agency defines as dams for which failure or improper operation probably will cause loss of human life, to develop an emergency action plan specific to that dam. Components of an emergency action plan are to simulate a flood resulting from a possible dam breach and map the resulting downstream flood-inundation areas. The resulting flood-inundation maps can provide valuable information to city officials, emergency managers, and local residents for planning an emergency response if a dam breach occurs.

  13. Uranium industry annual 1993

    International Nuclear Information System (INIS)

    1994-09-01

    Uranium production in the United States has declined dramatically from a peak of 43.7 million pounds U 3 O 8 (16.8 thousand metric tons uranium (U)) in 1980 to 3.1 million pounds U 3 O 8 (1.2 thousand metric tons U) in 1993. This decline is attributed to the world uranium market experiencing oversupply and intense competition. Large inventories of uranium accumulated when optimistic forecasts for growth in nuclear power generation were not realized. The other factor which is affecting U.S. uranium production is that some other countries, notably Australia and Canada, possess higher quality uranium reserves that can be mined at lower costs than those of the United States. Realizing its competitive advantage, Canada was the world's largest producer in 1993 with an output of 23.9 million pounds U 3 O 8 (9.2 thousand metric tons U). The U.S. uranium industry, responding to over a decade of declining market prices, has downsized and adopted less costly and more efficient production methods. The main result has been a suspension of production from conventional mines and mills. Since mid-1992, only nonconventional production facilities, chiefly in situ leach (ISL) mining and byproduct recovery, have operated in the United States. In contrast, nonconventional sources provided only 13 percent of the uranium produced in 1980. ISL mining has developed into the most cost efficient and environmentally acceptable method for producing uranium in the United States. The process, also known as solution mining, differs from conventional mining in that solutions are used to recover uranium from the ground without excavating the ore and generating associated solid waste. This article describes the current ISL Yang technology and its regulatory approval process, and provides an analysis of the factors favoring ISL mining over conventional methods in a declining uranium market

  14. Uranium industry annual 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    Uranium production in the United States has declined dramatically from a peak of 43.7 million pounds U{sub 3}O{sub 8} (16.8 thousand metric tons uranium (U)) in 1980 to 3.1 million pounds U{sub 3}O{sub 8} (1.2 thousand metric tons U) in 1993. This decline is attributed to the world uranium market experiencing oversupply and intense competition. Large inventories of uranium accumulated when optimistic forecasts for growth in nuclear power generation were not realized. The other factor which is affecting U.S. uranium production is that some other countries, notably Australia and Canada, possess higher quality uranium reserves that can be mined at lower costs than those of the United States. Realizing its competitive advantage, Canada was the world`s largest producer in 1993 with an output of 23.9 million pounds U{sub 3}O{sub 8} (9.2 thousand metric tons U). The U.S. uranium industry, responding to over a decade of declining market prices, has downsized and adopted less costly and more efficient production methods. The main result has been a suspension of production from conventional mines and mills. Since mid-1992, only nonconventional production facilities, chiefly in situ leach (ISL) mining and byproduct recovery, have operated in the United States. In contrast, nonconventional sources provided only 13 percent of the uranium produced in 1980. ISL mining has developed into the most cost efficient and environmentally acceptable method for producing uranium in the United States. The process, also known as solution mining, differs from conventional mining in that solutions are used to recover uranium from the ground without excavating the ore and generating associated solid waste. This article describes the current ISL Yang technology and its regulatory approval process, and provides an analysis of the factors favoring ISL mining over conventional methods in a declining uranium market.

  15. WJBF TV tower meteorological database for the ERAD Code-1993

    International Nuclear Information System (INIS)

    Weber, A.H.

    1996-07-01

    The Explosive Release Atmospheric Dispersion (ERAD) model (Boughton and DeLaurentis 1992) is a three-dimensional numerical model for simulating atmospheric transport and dispersion. The ERAD code is particularly adept at handling explosive releases into the atmosphere and is being used by the Materials and Accountability Department at the Savannah River Site (SRS) to provide risk estimates. The Environmental Technology Section (ETS) was asked to provide meteorological data to be used for applying ERAD to some site facilities. The ERAD model requires a vertical profile of meteorological measurements. The 1993 data from the WJBF-TV tower has been processed and provided for this purpose. This document describes the steps taken to prepare and format the database

  16. Technical bulletin : structural considerations for dam safety

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This technical bulletin discussed issues related to the safety assessment of concrete water-retaining structures and timber dams. Structures reviewed in the paper included gravity dams; buttress dams; arch dams; spillway structures; intake structures; power plants; roller compacted concrete dams; and timber dams. A variety of issues related to the loss of cohesive bond and discontinuities in bedrock foundations were reviewed with reference to issues related to compressive strength, tensile strength, and shear strength. Static failure modes and failure mechanisms related to dam failures were also described. Visual indicators for potential failures include abutment and foundation movement, seepage, and structure movements. Loading combinations were discussed, and performance indicators for gravity dams were provided. Methods of analysis for considering load characteristics, structure types and geological conditions were also discussed. Modelling techniques for finite element analysis were also included. 16 refs., 3 tabs., 5 figs.

  17. H-Area Seepage Basins groundwater monitoring report -- third and fourth quarters 1993

    International Nuclear Information System (INIS)

    Butler, C.T.

    1994-03-01

    During the second half of 1993, the groundwater at the H-Area Seepage Basins (HASB) was monitored in compliance with the September 30, 1992, modification of South Carolina Hazardous Waste Permit SC1-890-008-989. A detailed description of the uppermost aquifer is included in the Resource Conservation and Recovery Act Part B post-closure care permit application for the H-Area Hazardous Waste Management Facility submitted to the South Carolina Department of Health and Environmental Control (SCDHEC) in December 1990. Beginning first quarter 1993, the HASB's Groundwater Protection Standard (GWPS), established in Appendix 3D-A of the cited permit, became the standard for comparison. Historically as well as currently, nitrate, nonvolatile beta, and tritium have been among the primary constituents to exceed standards. Other radionuclides and hazardous constitutents also exceeded the GWPS in the groundwater at the HASB (notably aluminum, iodine-129, strontium-90, technetium-99, and zinc) during the second half of 1993. Elevated constituents were found primarily in Aquifer Zone 2B 2 and in the upper portion of Aquifer Zone 2B 1 . However, constituents exceeding standards also occurred in several wells screened in the lower portion of Aquifer Zone 2B 1 and Aquifer Unit 2A. Isoconcentration/isoactivity maps include in this report indicate both the concentration/activity and extent of the primary contaminants in each of the three hydrostratigraphic units during the second half of 1993. Water-level maps indicate that the groundwater flow rates and directions at the HASB have remained relatively constant since the basins ceased to be active in 1988

  18. Assessing Risks of Mine Tailing Dam Failures

    Science.gov (United States)

    Concha Larrauri, P.; Lall, U.

    2017-12-01

    The consequences of tailings dam failures can be catastrophic for communities and ecosystems in the vicinity of the dams. The failure of the Fundão tailings dam at the Samarco mine in 2015 killed 19 people with severe consequences for the environment. The financial and legal consequences of a tailings dam failure can also be significant for the mining companies. For the Fundão tailings dam, the company had to pay 6 billion dollars in fines and twenty-one executives were charged with qualified murder. There are tenths of thousands of active, inactive, and abandoned tailings dams in the world and there is a need to better understand the hazards posed by these structures to downstream populations and ecosystems. A challenge to assess the risks of tailings dams in a large scale is that many of them are not registered in publicly available databases and there is little information about their current physical state. Additionally, hazard classifications of tailings dams - common in many countries- tend to be subjective, include vague parameter definitions, and are not always updated over time. Here we present a simple methodology to assess and rank the exposure to tailings dams using ArcGIS that removes subjective interpretations. The method uses basic information such as current dam height, storage volume, topography, population, land use, and hydrological data. A hazard rating risk was developed to compare the potential extent of the damage across dams. This assessment provides a general overview of what in the vicinity of the tailings dams could be affected in case of a failure and a way to rank tailings dams that is directly linked to the exposure at any given time. One hundred tailings dams in Minas Gerais, Brazil were used for the test case. This ranking approach could inform the risk management strategy of the tailings dams within a company, and when disclosed, it could enable shareholders and the communities to make decisions on the risks they are taking.

  19. The socio-economics dynamics of Dam on Rural Communities: A case study of Oyan Dam, Nigeria

    Science.gov (United States)

    Ayeni, Amidu; Ojifo, Lawrence

    2018-06-01

    Dams construction and operations have many benefits, nevertheless, they have also led to lots of negative social, health and human impacts. It is based on this that this study assesses the potential and socio-economics dynamics of Oyan dam between 1980 and 2016. The data used for this study include water level and discharge records of the dam between 2007 and 2016, Landsat imageries of 1984 and 2016 and socio-economic datasets for the period. Analysis of the dam potentials (water supply, agriculture and hydropower) and socio-economic impacts of the dam were carried out using basic statistical tools, land use change anaysis and field survey using questionnaire, structured interview with major stakeholders and personal observation. The results revealed that the water level and storage of the Oyan dam had a relative reduction of about 2 % as well as non-stationarity pattern of water abstraction and production for the period. The landuse classes show all classes decreased in extent except the cultivated landuse that acrued an increased of 19.9 % between 1984 and 2016. Furthermore, commercial water supply varied significantly between 2010 and 2016 while irrigation scheme is grossly under-utilized from the inception in 1983 to 2016. Finally, the result of socio-economic impacts revealed that majority of the selected communities' members are actually not benefiting from the dam and their livelihoods are not from the dam.

  20. Sediment Transport Over Run-of-River Dams

    Science.gov (United States)

    O'Brien, M.; Magilligan, F. J.; Renshaw, C. E.

    2016-12-01

    Dams have numerous documented effects that can degrade river habitat downstream. One significant effect of large dams is their ability to trap sediment delivered from upstream. This trapping can alter sediment transport and grain size downstream - effects that often motivate dam removal decisions. However, recent indirect observations and modeling studies indicate that small, run-of-river (ROR) dams, which do not impede discharge, may actually leak sediment downstream. However, there are no direct measurements of sediment flux over ROR dams. This study investigates flow and sediment transport over four to six different New England ROR dams over a summer-fall field season. Sediment flux was measured using turbidity meters and tracer (RFID) cobbles. Sediment transport was also monitored through an undammed control site and through a river where two ROR dams were recently removed. These data were used to predict the conditions that contribute to sediment transport and trapping. Year 1 data show that tracer rocks of up to 61 mm were transported over a 3 m ROR dam in peak flows of 84% of bankfull stage. These tracer rocks were transported over and 10 m beyond the dam and continue to move downstream. During the same event, comparable suspended sediment fluxes of up to 81 g/s were recorded both upstream and downstream of the dam at near-synchronous timestamps. These results demonstrate the potential for sediment transport through dammed rivers, even in discharge events that do not exceed bankfull. This research elucidates the effects of ROR dams and the controls on sediment transport and trapping, contributions that may aid in dam management decisions.

  1. Hydraulics of embankment-dam breaching

    Science.gov (United States)

    Walder, J. S.; Iverson, R. M.; Logan, M.; Godt, J. W.; Solovitz, S.

    2012-12-01

    Constructed or natural earthen dams can pose hazards to downstream communities. Experiments to date on earthen-dam breaching have focused on dam geometries relevant to engineering practice. We have begun experiments with dam geometries more like those of natural dams. Water was impounded behind dams constructed at the downstream end of the USGS debris-flow flume. Dams were made of compacted, well-sorted, moist beach sand (D50=0.21 mm), 3.5 m from toe to toe, but varying in height from 0.5 to 1 m; the lower the dam, the smaller the reservoir volume and the broader the initially flat crest. Breaching was started by cutting a slot 30-40 mm wide and deep in the dam crest after filling the reservoir. Water level and pore pressure within the dam were monitored. Experiments were also recorded by an array of still- and video cameras above the flume and a submerged video camera pointed at the upstream dam face. Photogrammetric software was used to create DEMs from stereo pairs, and particle-image velocimetry was used to compute the surface-velocity field from the motion of tracers scattered on the water surface. As noted by others, breaching involves formation and migration of a knickpoint (or several). Once the knickpoint reaches the upstream dam face, it takes on an arcuate form whose continued migration we determined by measuring the onset of motion of colored markers on the dam face. The arcuate feature, which can be considered the head of the "breach channel", is nearly coincident with the transition from subcritical to supercritical flow; that is, it acts as a weir that hydraulically controls reservoir emptying. Photogenic slope failures farther downstream, although the morphologically dominant process at work, play no role at all in hydraulic control aside from rare instances in which they extend upstream so far as to perturb the weir, where the flow cross section is nearly self-similar through time. The domain downstream of the critical-flow section does influence

  2. Dam that social networking: connecting South Africa's major dams to social media

    CSIR Research Space (South Africa)

    Butgereit, L

    2011-10-01

    Full Text Available where four major South African dams are connected to Twitter and Facebook (and other social media such as MXit and Google Chat) in a mechanism which would be easy to replicate for additional dams or rivers. Data is supplied by the South African...

  3. Hydrodynamic Simulation of the Columbia River, Hanford Reach, 1940--2004

    Energy Technology Data Exchange (ETDEWEB)

    Waichler, Scott R.; Perkins, William A.; Richmond, Marshall C.

    2005-06-15

    Many hydrological and biological problems in the Columbia River corridor through the Hanford Site require estimates of river stage (water surface elevation) or river flow and velocity. Systematic collection of river stage data at locations in the Hanford Reach began in 1991, but many environmental projects need river stage information at unmeasured locations or over longer time periods. The Modular Aquatic Simulation System 1D (MASS1), a one-dimensional, unsteady hydrodynamic and water quality model, was used to simulate the Columbia River from Priest Rapids Dam to McNary Dam from 1940 to 2004, providing estimates of water surface elevation, volumetric flow rate, and flow velocity at 161 locations on the Hanford Reach. The primary input data were bathymetric/topographic cross sections of the Columbia River channel, flow rates at Priest Rapids Dam, and stage at McNary Dam. Other inputs included Yakima River and Snake River inflows. Available flow data at a gaging station just below Priest Rapids Dam was mean daily flow from 1940 to 1986 and hourly thereafter. McNary dam was completed in 1957, and hourly stage data are available beginning in 1975. MASS1 was run at an hourly timestep and calibrated and tested using 1991--2004 river stage data from six Hanford Reach locations (areas 100B, 100N, 100D, 100H, 100F, and 300). Manning's roughness coefficient in the Reach above each river recorder location was adjusted using an automated genetic algorithm and gradient search technique in three separate calibrations, corresponding to different data subsets, with minimization of mean absolute error as the objective. The primary calibration was based on 1999, a representative year, and included all locations. The first alternative calibration also used all locations but was limited in time to a high-flow period during spring and early summer of 1997. The second alternative calibration was based on 1999 and included only 300 Area stage data. Model goodness-of-fit for all

  4. Short-term energy outlook: Quarterly projections, Third quarter 1992

    International Nuclear Information System (INIS)

    1992-08-01

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The principal users of the Outlook are managers and energy analysts in private industry and government. The forecast period for this issue of the Outlook extends from the third quarter of 1992 through the fourth quarter of 1993. Values for the second quarter of 1992, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding

  5. TYPOLOGY OF LARGE DAMS. A REVIEW

    Directory of Open Access Journals (Sweden)

    Gheorghe ROMANESCU

    2015-06-01

    Full Text Available The dams represent hydrotechnical constructions meant to ensure a judicious use of water resources. The international literature is extremely rich in data regarding the large dams on Earth. In this context, a hierarchy of the main dams is attempted and the role they play in the economic development of the regions they were built in is underlined. The largest dams are built on the big rivers in Asia, North America, South America and Africa. The reservoirs have multiple roles: electricity production, drinking or industrial water supply, irrigations, recreation, etc. High costs and land fragility do not allow the construction of dams in the places most affected by drought or flood. This is why they are usually built in mountainous areas, at great distance from the populated centres. On the Romanian territory, there are 246 large dams, built in the hydrographical basins of Siret, Olt, Arges, Somes, etc. The largest rivers on Earth, by discharge, (Amazon and Zair do not also include the largest dams because the landform and the type of flow have not allowed such constructions.

  6. Construction of anhydrite dams

    Energy Technology Data Exchange (ETDEWEB)

    Bortoluzzi, L; Francois, G

    1977-05-01

    To construct a ventilation dam, the road is closed with a fibreglass sheet onto which 3 or 4 cm of anhydrite paste is sprayed. The equipment necessary is described, and the cost is compared with that of an aggregate dam.

  7. Radiation damage in natural and synthetic halite. Progress report January 1992 - February 1993

    International Nuclear Information System (INIS)

    Garcia Celma, A.

    1993-12-01

    This report complements the information presented in the report of December 1992 regarding the research performed at the ECN on radiation damage in salt. It consists of two parts. The first part regards the amount of stored energy which can be developed by gamma-irradiation on different types of halite and considers both the effect of low dose rates in developing radiation damage, and the possible saturation level of radiation damage in natural halite. The second part presents a model to simulate radiation damage development which incorporates some extensions in the Jain-Lidiard model. Due to malfunction of the Small Angle Neutron Scattering installation, neither the previously reported results nor the newly obtained can be trusted and therefore are not reported here. These results regard the shape, size and size distribution of radiation damage defects. (orig.)

  8. Dams, Hydrology and Risk in Future River Management

    Science.gov (United States)

    Wegner, D. L.

    2017-12-01

    Across America there are over 80,000 large to medium dams and globally the number is in excess of 800,000. Currently there are over 1,400 dams and diversion structures being planned or under construction globally. In addition to these documented dams there are thousands of small dams populating watersheds. Governments, agencies, native tribes, private owners and regulators all have a common interest in safe dams. Often dam safety is characterized as reducing structural risk while providing for maximum operational flexibility. In the 1970's there were a number of large and small dam failures in the United States. These failures prompted the federal government to issue voluntary dam safety guidelines. These guidelines were based on historic information incorporated into a risk assessment process to analyze, evaluate and manage risk with the goal to improve the quality of and support of dam management and safety decisions. We conclude that historic and new risks need to be integrated into dam management to insure adequate safety and operational flexibility. A recent assessment of the future role of dams in the United States premises that future costs such as maintenance or removal beyond the economic design life have not been factored into the long-term operations or relicensing of dams. The converging risks associated with aging water storage infrastructure, multiple dams within watersheds and uncertainty in demands policy revisions and an updated strategic approach to dam safety. Decisions regarding the future of dams in the United States may, in turn, influence regional water planning and management. Leaders in Congress and in the states need to implement a comprehensive national water assessment and a formal analysis of the role dams play in our water future. A research and national policy agenda is proposed to assess future impacts and the design, operation, and management of watersheds and dams.

  9. Mitigating Dam Impacts Using Environmental Flow Releases

    Science.gov (United States)

    Richter, B. D.

    2017-12-01

    One of the most ecologically disruptive impacts of dams is their alteration of natural river flow variability. Opportunities exist for modifying the operations of existing dams to recover many of the environmental and social benefits of healthy ecosystems that have been compromised by present modes of dam operation. The potential benefits of dam "re-operation" include recovery of fish, shellfish, and other wildlife populations valued both commercially and recreationally, including estuarine species; reactivation of the flood storage and water purification benefits that occur when floods are allowed to flow into floodplain forests and wetlands; regaining some semblance of the naturally dynamic balance between river erosion and sedimentation that shapes physical habitat complexity, and arresting problems associated with geomorphic imbalances; cultural and spiritual uses of rivers; and many other socially valued products and services. Assessing the potential benefits of dam re-operation begins by characterizing the dam's effects on the river flow regime, and formulating hypotheses about the ecological and social benefits that might be restored by releasing water from the dam in a manner that more closely resembles natural flow patterns. These hypotheses can be tested by implementing a re-operation plan, tracking the response of the ecosystem, and continually refining dam operations through adaptive management. This presentation will highlight a number of land and water management strategies useful in implementing a dam re-operation plan, with reference to a variety of management contexts ranging from individual dams to cascades of dams along a river to regional energy grids. Because many of the suggested strategies for dam re-operation are predicated on changes in the end-use of the water, such as reductions in urban or agricultural water use during droughts, a systemic perspective of entire water management systems will be required to attain the fullest possible

  10. Simulation of Breach Outflow for Earthfill Dam

    International Nuclear Information System (INIS)

    Razad, Azwin Zailti Abdul; Muda, Rahsidi Sabri; Sidek, Lariyah Mohd; Azia, Intan Shafilah Abdul; Mansor, Faezah Hanum; Yalit, Ruzaimei

    2013-01-01

    Dams have been built for many reasons such as irrigation, hydropower, flood mitigation, and water supply to support development for the benefit of human. However, the huge amount of water stored behind the dam can seriously pose adverse impacts to the downstream community should it be released due to unwanted dam break event. To minimise the potential loss of lives and property damages, a workable Emergency Response Plan is required to be developed. As part of a responsible dam owner and operator, TNB initiated a study on dam breach modelling for Cameron Highlands Hydroelectric Scheme to simulate the potential dam breach for Jor Dam. Prediction of dam breach parameters using the empirical equations of Froehlich and Macdonal-Langridge-Monopolis formed the basis of the modelling, coupled with MIKE 11 software to obtain the breach outflow due to Probable Maximum Flood (PMF). This paper will therefore discuss the model setup, simulation procedure and comparison of the prediction with existing equations.

  11. Restoring Environmental Flows by Modifying Dam Operations

    Directory of Open Access Journals (Sweden)

    Brian D. Richter

    2007-06-01

    Full Text Available The construction of new dams has become one of the most controversial issues in global efforts to alleviate poverty, improve human health, and strengthen regional economies. Unfortunately, this controversy has overshadowed the tremendous opportunity that exists for modifying the operations of existing dams to recover many of the environmental and social benefits of healthy ecosystems that have been compromised by present modes of dam operation. The potential benefits of dam "re-operation" include recovery of fish, shellfish, and other wildlife populations valued both commercially and recreationally, including estuarine species; reactivation of the flood storage and water purification benefits that occur when floods are allowed to flow into floodplain forests and wetlands; regaining some semblance of the naturally dynamic balance between river erosion and sedimentation that shapes physical habitat complexity, and arresting problems associated with geomorphic imbalances; cultural and spiritual uses of rivers; and many other socially valued products and services. This paper describes an assessment framework that can be used to evaluate the benefits that might be restored through dam re-operation. Assessing the potential benefits of dam re-operation begins by characterizing the dam's effects on the river flow regime, and formulating hypotheses about the ecological and social benefits that might be restored by releasing water from the dam in a manner that more closely resembles natural flow patterns. These hypotheses can be tested by implementing a re-operation plan, tracking the response of the ecosystem, and continually refining dam operations through adaptive management. The paper highlights a number of land and water management strategies useful in implementing a dam re-operation plan, with reference to a variety of management contexts ranging from individual dams to cascades of dams along a river to regional energy grids. Because many of the

  12. Sustainability of dams-an evaluation approach

    Science.gov (United States)

    Petersson, E.

    2003-04-01

    Situated in the stream bed of a river, dams and reservoirs interrupt the natural hydrological cycle. They are very sensitive to all kinds of changes in the catchment, among others global impacts on land use, climate, settlement structures or living standards. Vice versa dams strongly affect the spatially distributed, complex system of ecology, economy and society in the catchment both up- and downstream of the reservoir. The occurrence of negative impacts due to large dams led to serious conflicts about future dams. Nevertheless, water shortages due to climatic conditions and their changes, that are faced by enormous water and energy demands due to rising living standards of a growing world population, seem to require further dam construction, even if both supply and demand management are optimised. Although environmental impact assessments are compulsory for dams financed by any of the international funding agencies, it has to be assumed that the projects lack sustainability. Starting from an inventory of today's environmental impact assessments as an integral part of a feasibility study the presentation will identify their inadequacies with regard to the sustainability of dams. To improve the sustainability of future dams and avoid the mistakes of the past, the planning procedures for dams have to be adapted. The highly complex and dynamical system of interrelated physical and non-physical processes, that involves many different groups of stakeholders, constitutes the need for a model-oriented decision support system. In line with the report of the World Commission of Dams an integrated analysis and structure of the complex interrelations between dams, ecology, economy and society will be presented. Thus the system, that a respective tool will be based on, is analysed. Furthermore an outlook will be given on the needs of the potential users of a DSS and how it has to be embedded in the overall planning process. The limits of computer-based decision-support in the

  13. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, January--March 1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    The objectives of the study are to: Develop a baseline design for indirect liquefaction using advanced Fischer-Tropsch (F-T) technology. Prepare the capital and operating costs for the baseline design. Develop a process flow sheet simulation (PFS) model. This report summarizes the activities completed during the period December 23, 1992 through March 15, 1992. In Task 1, Baseline Design and Alternates, the following activities related to the tradeoff studies were completed: approach and basis; oxygen purity; F-T reactor pressure; wax yield; autothermal reformer; hydrocarbons (C{sub 3}/C{sub 4}s) recovery; and hydrogenrecovery. In Task 3, Engineering Design Criteria, activities were initiated to support the process tradeoff studies in Task I and to develop the environmental strategy for the Illinois site. The work completed to date consists of the development of the F-T reactor yield correlation from the Mobil dam and a brief review of the environmental strategy prepared for the same site in the direct liquefaction baseline study.Some work has also been done in establishing site-related criteria, in establishing the maximum vessel diameter for train sizing and in coping with the low H{sub 2}/CO ratio from the Shell gasifier. In Task 7, Project Management and Administration, the following activities were completed: the subcontract agreement between Amoco and Bechtel was negotiated; a first technical progress meeting was held at the Bechtel office in February; and the final Project Management Plan was approved by PETC and issued in March 1992.

  14. 33 CFR 100.1102 - Marine Events on the Colorado River, between Davis Dam (Bullhead City, Arizona) and Headgate Dam...

    Science.gov (United States)

    2010-07-01

    ... River, between Davis Dam (Bullhead City, Arizona) and Headgate Dam (Parker, Arizona). 100.1102 Section... MARINE PARADES SAFETY OF LIFE ON NAVIGABLE WATERS § 100.1102 Marine Events on the Colorado River, between Davis Dam (Bullhead City, Arizona) and Headgate Dam (Parker, Arizona). (a) General. Sponsors are...

  15. Brazil's Amazonian dams: Ecological and socioeconomic impacts

    Science.gov (United States)

    Fearnside, P. M.

    2016-12-01

    Brazil's 2015-2024 Energy Expansion Plan calls for 11 hydroelectric dams with installed capacity ≥ 30 MW in the country's Amazon region. Dozens of other large dams are planned beyond this time horizon, and dams with environmental and socioeconomic impacts. Loss of forest to flooding is one, the Balbina and Tucuruí Dams being examples (each 3000 km2). If the Babaquara/Altamira Dam is built it will flood as much forest as both of these combined. Some planned dams imply loss of forest in protected areas, for example on the Tapajós River. Aquatic and riparian ecosystems are lost, including unique biodiversity. Endemic fish species in rapids on the Xingu and Tapajós Rivers are examples. Fish migrations are blocked, such as the commercially important "giant catfish" of the Madeira River. Dams emit greenhouse gases, including CO2 from the trees killed and CH4 from decay under anoxic conditions at the bottom of reservoirs. Emissions can exceed those from fossil-fuel generation, particularly over the 20-year period during which global emissions must be greatly reduced to meet 1.5-2°C limit agreed in Paris. Carbon credit for dams under the Climate Convention causes further net emission because the dams are not truly "additional." Anoxic environments in stratified reservoirs cause methylation of mercury present in Amazonian soils, which concentrates in fish, posing a health risk to human consumers. Population displacement is a major impact; for example, the Marabá Dam would displace 40,000 people, mostly traditional riverside dwellers (ribeirinhos). Various dams impact indigenous peoples, such as the Xingu River dams (beginning with Belo Monte) and the São Luiz do Tapajós and Chacorão Dams on the Tapajós River. Brazil has many energy options other than dams. Much energy use has little benefit for the country, such as exporting aluminum. Electric showerheads use 5% of the country's power. Losses in transmission lines (20%) are far above global averages and can be

  16. Behavior and dam passage of juvenile Chinook salmon at Cougar Reservoir and Dam, Oregon, March 2011 - February 2012

    Science.gov (United States)

    Beeman, John W.; Hansel, Hal C.; Hansen, Amy C.; Haner, Philip V.; Sprando, Jamie M.; Smith, Collin D.; Evans, Scott D.; Hatton, Tyson W.

    2013-01-01

    The movements and dam passage of juvenile Chinook salmon implanted with acoustic transmitters and passive integrated transponder tags were studied at Cougar Reservoir and Dam, near Springfield, Oregon. The purpose of the study was to provide information to aid with decisions about potential alternatives for improving downstream passage conditions for juvenile salmonids in this flood-control reservoir. In 2011, a total of 411 hatchery fish and 26 wild fish were tagged and released during a 3-month period in the spring, and another 356 hatchery fish and 117 wild fish were released during a 3-month period in the fall. A series of 16 autonomous hydrophones throughout the reservoir and 12 hydrophones in a collective system near the dam outlet were used to determine general movements and dam passage of the fish over the life of the acoustic transmitter, which was expected to be about 3 months. Movements within the reservoir were directional, and it was common for fish to migrate repeatedly from the head of the reservoir downstream to the dam outlet and back to the head of the reservoir. Most fish were detected near the temperature control tower at least once. The median time from release near the head of the reservoir to detection within about 100 meters of the dam outlet at the temperature control tower was between 5.7 and 10.8 days, depending on season and fish origin. Dam passage events occurred over a wider range of dates in the spring and summer than in the fall and winter, but dam passage numbers were greatest during the fall and winter. A total of 10.5 percent (43 of 411) of the hatchery fish and 15.4 percent (4 of 26) of the wild fish released in the spring are assumed to have passed the dam, whereas a total of 25.3 percent (90 of 356) of the hatchery fish and 16.9 percent (30 of 117) of the wild fish released in the fall are assumed to have passed the dam. A small number of fish passed the dam after their transmitters had stopped working and were detected at

  17. The interaction of the petroleum fiscal system and cost-savings in the UKCS: pre and post the 1993 budget

    International Nuclear Information System (INIS)

    Kemp, A.G.; MacDonald, B.

    1993-01-01

    In 1990 research was undertaken on a number of North Sea regulatory and fiscal issues. The work was financed by Shell Expro, BP, Esso, Phillips and Mobil. In 1991 and 1992 work continued on these subjects sponsored by the same group with the addition of Occidental (now EE Caledonia). In 1993 the programme examines the following subjects: the interaction of the fiscal system and cost cutting in the North Sea; the effects of the 1993 budget proposals on North Sea oil and gas; incremental investments in mature oil fields and the continuing fiscal problem with emphasis on the risk aspects; fiscal and financial aspects of field abandonment; fiscal aspects of the development of small accumulations employing transferable production facilities. (author)

  18. Dams and Intergovernmental Transfers

    Science.gov (United States)

    Bao, X.

    2012-12-01

    Gainers and Losers are always associated with large scale hydrological infrastructure construction, such as dams, canals and water treatment facilities. Since most of these projects are public services and public goods, Some of these uneven impacts cannot fully be solved by markets. This paper tried to explore whether the governments are paying any effort to balance the uneven distributional impacts caused by dam construction or not. It showed that dam construction brought an average 2% decrease in per capita tax revenue in the upstream counties, a 30% increase in the dam-location counties and an insignificant increase in downstream counties. Similar distributional impacts were observed for other outcome variables. like rural income and agricultural crop yields, though the impacts differ across different crops. The paper also found some balancing efforts from inter-governmental transfers to reduce the unevenly distributed impacts caused by dam construction. However, overall the inter-governmental fiscal transfer efforts were not large enough to fully correct those uneven distributions, reflected from a 2% decrease of per capita GDP in upstream counties and increase of per capita GDP in local and downstream counties. This paper may shed some lights on the governmental considerations in the decision making process for large hydrological infrastructures.

  19. GIS inundation mapping and dam breach analysis of Woolwich Dam using HEC-geoRAS

    Energy Technology Data Exchange (ETDEWEB)

    Mocan, N. [Crozier and Associates Inc., Collingwood, ON (Canada); Joy, D.M. [Guelph Univ., ON (Canada); Rungis, G. [Grand River Conservation Authority, Cambridge, ON (Canada)

    2006-07-01

    A study was conducted to determine the extent of flood inundation given a hypothetical dam breach scenario of the Woolwich Dam located in the Grand River Watershed, 2.5 km north of the Town of Elmira, Ontario. The dam is operated by the Grand River Conservation Authority and was constructed to provide low-flow augmentation to Canagagigue Creek. Advances in the computational capabilities of numerical models along with the availability of fine resolution geospatial data has lead to significant advances in the evaluation of catastrophic consequences due to the ensuing flood waters when dams fail. The hydraulic models HEC-RAS and HEC-GeoRAS were used in this study along with GIS to produce high resolution spatial and temporal flood inundation mapping. Given the proximity to the Town of Elmira, the dam is classified as having a high hazard potential. The large size and high hazard potential of the dam suggests that the Inflow Design Flood (IDF) is the Probable Maximum Flood (PMF) event. The outlet structure of the spillway consists of 4 ogee-type concrete spillways equipped with radial gates. A low-level concrete pipe located within the spillway structure provides spillage for maintenance purposes. The full flow capacity of the spillway structure is 297 cubic metres per second at the full supply level of 364.8 metres. In addition to GIS flood inundation maps, this paper included the results of flood hydrographs, water surface profiles and peak flow data. It was concluded that techniques used in this analysis should be considered for use in the development of emergency management planning and dam safety assessments across Canada. 6 refs., 3 tabs., 4 figs.

  20. Research on shape optimization of CSG dams

    Directory of Open Access Journals (Sweden)

    Xin Cai

    2011-12-01

    Full Text Available The multi-objective optimization method was used for shape optimization of cement sand and gravel (CSG dams in this study. The economic efficiency, the sensitivities of maximum horizontal displacement and maximum settlement of the dam to water level changes, the overall stability, and the overall strength security were taken into account during the optimization process. Three weight coefficient selection schemes were adopted to conduct shape optimization of a dam, and the case studies lead to the conclusion that both the upstream and downstream dam slope ratios for the optimal cross-section equal 1:0.7, which is consistent with the empirically observed range of 1:0.6 to 1:0.8 for the upstream and downstream dam slope ratios of CSG dams. Therefore, the present study is of certain reference value for designing CSG dams.

  1. The World Commission on Dams + 10: Revisiting the Large Dam Controversy

    Directory of Open Access Journals (Sweden)

    Deborah Moore

    2010-06-01

    Full Text Available The World Commission on Dams (WCD was an experiment in multi-stakeholder dialogue and global governance concerned with a subject area – large dams – that was fraught with conflict and controversy. The WCD Report, Dams and Development: A New Framework for Decision-Making, was published in 2000 and accompanied by hopes that broad-based agreements would be forged on how to better manage water and energy development. Ten years later, this special issue of Water Alternatives revisits the WCD and its impacts, exploring the question: Is the WCD still relevant? The editorial team and the Guest Editors of this special issue of Water Alternatives have selected a range of 20 papers, 6 viewpoints, and 4 book reviews that help to illustrate the evolution in the dams debate. The goal of this special issue is to examine the influence and the impacts of the WCD on the dam enterprise, in general, and on the policies and practices of key stakeholders and institutions, and on the development outcomes for affected communities and environments, in particular. In this introduction, the Guest Editors provide an overview of the special issue, exploring the new drivers of dam development that have emerged during the last decade, including climate change and new financiers of dams, and describing the themes emerging from this diverse set of papers and viewpoints. This special issue demonstrates the need for a renewed multi-stakeholder dialogue at multiple levels. This would not be a redo of the WCD, but rather a rekindling and redesigning of processes and forums where mutual understanding, information-sharing, and norm-setting can occur. One of the most promising developments of the last decade is the further demonstration, in case studies described here, that true partnership amongst key stakeholders can produce transformative resource-sharing agreements, showing that many of the WCD recommendations around negotiated decision making are working in practice. We hope

  2. Analytical Chemistry Laboratory, progress report for FY 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    The purpose of this report is to summarize the activities of the Analytical Chemistry Laboratory (ACL) at Argonne National Laboratory (ANL) for Fiscal Year (FY) 1993 (October 1992 through September 1993). This annual report is the tenth for the ACL and describes continuing effort on projects, work on new projects, and contributions of the ACL staff to various programs at ANL. The Analytical Chemistry Laboratory is a full-cost-recovery service center, with the primary mission of providing a broad range of analytical chemistry support services to the scientific and engineering programs at ANL. The ACL also has research programs in analytical chemistry, conducts instrumental and methods development, and provides analytical services for governmental, educational, and industrial organizations. The ACL handles a wide range of analytical problems. Some routine or standard analyses are done, but it is common for the Argonne programs to generate unique problems that require development or modification of methods and adaption of techniques to obtain useful analytical data. The ACL is administratively within the Chemical Technology Division (CMT), its principal ANL client, but provides technical support for many of the technical divisions and programs at ANL. The ACL has four technical groups--Chemical Analysis, Instrumental Analysis, Organic Analysis, and Environmental Analysis--which together include about 45 technical staff members. Talents and interests of staff members cross the group lines, as do many projects within the ACL.

  3. Research progress on dam-break floods

    KAUST Repository

    Wu, Jiansong; Bao, Kai; Zhang, Hui

    2011-01-01

    Because of the catastrophic effects downstream of dam-break failure, more and more researchers around the world have been working on the study of dam-break flows to accurately forecast the downstream inundation mapping. With the rapid development of computer hardware and computing techniques, numerical study on dam-break flows has been a popular research subject. In the paper, the numerical methodologies used to solve the governing partial differential equations of dam-break flows are classified and summarized, and their characteristics and applications are discussed respectively. Furthermore, the fully-developed mathematical models developed in recent decades are reviewed, and also introduced the authors' on-going work. Finally, some possible future developments on modeling the dam-break flows and some solutions are presented and discussed. © 2011 IEEE.

  4. Research progress on dam-break floods

    KAUST Repository

    Wu, Jiansong

    2011-08-01

    Because of the catastrophic effects downstream of dam-break failure, more and more researchers around the world have been working on the study of dam-break flows to accurately forecast the downstream inundation mapping. With the rapid development of computer hardware and computing techniques, numerical study on dam-break flows has been a popular research subject. In the paper, the numerical methodologies used to solve the governing partial differential equations of dam-break flows are classified and summarized, and their characteristics and applications are discussed respectively. Furthermore, the fully-developed mathematical models developed in recent decades are reviewed, and also introduced the authors\\' on-going work. Finally, some possible future developments on modeling the dam-break flows and some solutions are presented and discussed. © 2011 IEEE.

  5. [Environmental Hazards Assessment Program annual report, June 1992--June 1993

    International Nuclear Information System (INIS)

    Voit, E.O.

    1993-01-01

    It is becoming increasingly clear that human health is intricately related to our chemical and physical surroundings. Recognizing the interdependence between health and environment, the Medical University of South Carolina has begun to implement a graduate program in Environmental Risk Assessment. While the infrastructure for such a program had been in place for quite a while, providing education in biostatistics, epidemiology, and mathematical modeling, specific courses in risk assessment were not available. To expedite the educational process in this area, the Department of Biometry and Epidemiology offered the course Special Topics in Risk Analysis in the Spring semester of 1993. This course was intended as an introduction for graduate students, but one faculty and one postdoctoral fellow also enrolled. The course was organized in the form of a seminar, with students or faculty presenting selected materials from the literature that covered some of the central issues in risk analysis. The presentations were subsequently written up as reports and revised according to suggestions by the instructor. This technical report comprises the presentations and reflects what has been learned in the course Special Topics in Risk Analysis. It also may serve as an easy to read introduction to the complex area of risk analysis. By the very nature of the course and this report, most of the presented material is not original. It does not necessarily reflect the authors' or the editor's opinion and is not intended for citation. Nonetheless, the students and the instructor have paid attention to citing relevant literature in order to enable the reader to trace ideas back to the original sources. As an Appendix, this volume contains the course syllabus as well as hand-out material that the students prepared independently and that has not been edited or revised

  6. Energy efficiency: Separate report to December 31, 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Hydro-Quebec's energy efficiency project puts a priority on energy conservation and improvement of the existing network to satisfy long-term electricity demand. The objective of the project's energy savings program is to save 9.3 TWh by the year 2000, allocated among three sectors. The program is to be carried out in three phases. The first, 1990-1992, corresponds to a sensitization phase, and has had success in terms of commercial impact. The second phase, 1993-1995, is in progress; a third phase to end at the year 2000 will bring adjustments and refinements needed to attain the stated objective. The success of the first two years of the program has contributed to maintaining two performance indicators relating to residential customer satisfaction with regard to energy efficiency activities and the levels of energy savings generated. The project's load management program provides for interventions that will lead to a reduction in peak demand of 3,320 MW by 2000. In the second phase of the program, three programs were launched in 1993 with the objective of saving 3.7 TWh, or 2 TWh in the residential sector, 1.2 TWh in commercial and institutional lighting, and 0.5 TWh in industrial systems. Other programs will be tested in pilot projects in 1994. Programs in the areas of electrotechnologies and residential dual-energy started in 1993 but results are not yet available. To carry out its energy efficiency programs, Hydro-Quebec has entered cooperative agreements with manufacturers, distributors, and vendors, and has developed different forms of collaboration with government agencies and institutions. The proposed energy efficiency programs will sustain nearly 38,000 person-years of employment in Quebec from now to 2000. 10 tabs

  7. Tenaga Nasional Berhad dam safety and surveillance program

    International Nuclear Information System (INIS)

    Jansen Luis; Zulkhairi Abd Talib

    2006-01-01

    This paper discusses the current practice of dam surveillance, which includes dam monitoring which is a process of visual inspections, measuring, processing, compiling and analyzing dam instrumentation data to determine the performance of a dam. The prime objective of the dam surveillance system is to ensure that any occurrence and development of safety deficiencies and problems are quickly detected, identified, analyzed and the required remedial actions are determined and consequently carried out in due time. In brief, the section is responsible to ensure that the dam monitoring and surveillance works are implemented as per scheduled and in accordance with the requirement and guidelines prepared by the dam designers and in accordance with international commission on large dams, ICOLD. The paper also illustrates and recommends an alternative approach for dam surveillance program using risk management approach, which is currently being actively adopted by some countries like USA, Canada, Australia and etc, towards improving the dam safety management and the decision making process. The approach provides a wider area of opportunity, improvements and benefits particular in the evaluation and modifications to the dam performance and safety. The process provides an effective and efficient tool for the decision makers and engineers through a comprehensive evaluation and a good understanding of the hazards, risks and consequences in relation to dam safety investigations. (Author)

  8. Interannual variability of Kelvin wave propagation in the wave guides of the equatorial Indian Ocean, the coastal Bay of Bengal and the southeastern Arabian Sea during 1993-2006

    Digital Repository Service at National Institute of Oceanography (India)

    Rao, R.R.; GirishKumar, M.S.; Ravichandran, M.; Rao, A.R.; Gopalakrishna, V.V.; Pankajakshan, T.

    , 1991, Schiller et al, 1998, Shetye and Gouveia, 1998, Shenoi et al, 1999, Schott and McCreary, 2001, Shankar et al, 2002, Somayajulu et al, 2003, Sengupta et al, 2004, Masumoto et al, 2005, Schott et al, 2007, Hase et al, 2008, Nagura and McPhaden, 2008...-surface circulation of these basins through both local and remote effects (Lighthill, 1969, Cane, 1980, Gent et al, 1983, Kindle and Thompson, 1989, Moore and McCreary, 1990, Potemra et al, 1991, Yu et al, 1991, Tsai et al, 1992, Periguad and Delecluse, 1992 and 1993...

  9. WinDAM C earthen embankment internal erosion analysis software

    Science.gov (United States)

    Two primary causes of dam failure are overtopping and internal erosion. For the purpose of evaluating dam safety for existing earthen embankment dams and proposed earthen embankment dams, Windows Dam Analysis Modules C (WinDAM C) software will simulate either internal erosion or erosion resulting f...

  10. Proceedings of the Canadian Dam Association's 2005 annual conference : 100 years of dam experience : balancing tradition and innovation. CD-ROM ed.

    International Nuclear Information System (INIS)

    2004-09-01

    This conference provided a forum to promote discussion on improving the management and safety of dams. It featured 8 technical sessions as well as workshops to discuss dam safety guidelines and guidelines for extreme flood analyses and their applications. It also featured workshops on instrumentation and performance monitoring of dams; tailing dam closures and reclamation; and, practical approaches to emergency preparedness for dam owners. The discussions provided details on large hydropower development projects, their innovations in environmental impact assessment, mitigation, and monitoring. The conference included a technical component led by experts on dams and tailings facilities. Recent developments in dam construction were reviewed along with discharge and debris management, tailings dam issues, asset management, seismic issues, public safety, seepage monitoring, flow control, dam rehabilitation, concrete testing, hydrotechnical issues, risk assessment methodology, and safety guidelines. All 24 presentations at this conference have been catalogued separately for inclusion in this database

  11. Sinkhole remediation at Swinging Bridge Dam

    Energy Technology Data Exchange (ETDEWEB)

    Jones, A. [Devine Tarbell and Associates, Portland, ME (United States)

    2009-07-01

    This case history summary described a piping-related sinkhole that occurred after a flood at the Swinging Bridge Dam. The earth-filled embankment dam was constructed using a hydraulic fill technique. A foundation drilling and grouting program was constructed in areas of the dam founded on jointed sandstone and shale. The storage volumes of the reservoir is 32,000 acre-feet. A sinkhole 25 to 300 feet in diameter was observed on May 5, 2005 along the edge of the dam crest. The sinkhole extended to within 10 feet of the reservoir and was separated by a shallow berm of soil and driftwood. Cracking of the crest extended across an area of 180 feet. Operations staff notified the appropriate agencies, implemented a monitoring program, and mobilized construction equipment and sands for use as emergency sinkhole filler. An increase in tailrace turbidity was observed. Historical records for the dam showed significant cracking during the initial filling of the reservoir. Failure modes included increased pore pressures and seepages resulting in the piping of soil along the outside of the dam conduit. Emergency repairs included chemical grouting and weld repairs in the penstocks. A Federal Emergency Management Agency (FEMA) is currently addressing safety issues associated with conduits through dams. 4 refs., 11 figs.

  12. Dynamic tests at the Outardes 3 dam

    International Nuclear Information System (INIS)

    Proulx, J.; Paultre, P.; Duron, Z.; Tai Mai Phat; Im, O.

    1992-01-01

    At the Outardes 3 gravity dam, part of the Manicouagan-Outardes hydroelectric complex in northeastern Quebec, forced vibration tests were carried out using an eccentric mass shaker attached to the dam crest at three different locations. Accelerations were measured along the crest and in the inspection galleries, and hydrodynamic pressures were measured along the upstream dam face and at various locations in the reservoir. The tests were designed to analyze the effects of gravity dam-reservoir interactions and to generate a data base for calibrating finite element models used in studying the dynamic behavior of gravity dams. Experimental results are presented in order to demonstrate the quality of the data obtained and the effectiveness of the experimental procedures. Modes of vibration were observed which corresponded to those obtained by finite element analysis. It is shown that techniques recently developed for dynamic tests on large dams can be successfully used on gravity dams. 3 refs., 6 figs

  13. Enron's 1993 outlook for U.S. gas reflects new technologies, markets

    International Nuclear Information System (INIS)

    Carson, M.; Stram, B.N.; Roberts, M.A.

    1993-01-01

    Enron Corp., Houston, has revisited its 1991 outlook for US natural gas supplies, revising upward by 8.6% its view of the nation's natural-gas resource base. As of Jan. 1, 1993, Enron's US resource assessment for the Lower 48 is 1,303 tcf, or more than a 70-year resource life at the 17.6 tcfy 1992 production rate. In 1991, Enron had foreseen 1,200 tcf of undiscovered and potential resources (including 160 tcf of proven natural gas reserves). The company foresees the potential for 2.4 tcf of gas-market growth to 22 tcf by the year 2000 (up from 19.6 tcf in 1992) and to 23.6 tcf by 2005. This growth is largely the result of incremental natural-gas use in electric-power generation in gas combined-cycle plants, gas for co-firing, and in commercial gas use, including 500 bcf natural-gas-fleet vehicle fuel use by 2000. With additional environmental and policy initiatives, another new demand increment of 2 tcf or more could be added by 2000. The paper describes technology yields; effects of policies; electricity growth; and total market in North America

  14. Modeling the capacity of riverscapes to support beaver dams

    Science.gov (United States)

    Macfarlane, William W.; Wheaton, Joseph M.; Bouwes, Nicolaas; Jensen, Martha L.; Gilbert, Jordan T.; Hough-Snee, Nate; Shivik, John A.

    2017-01-01

    The construction of beaver dams facilitates a suite of hydrologic, hydraulic, geomorphic, and ecological feedbacks that increase stream complexity and channel-floodplain connectivity that benefit aquatic and terrestrial biota. Depending on where beaver build dams within a drainage network, they impact lateral and longitudinal connectivity by introducing roughness elements that fundamentally change the timing, delivery, and storage of water, sediment, nutrients, and organic matter. While the local effects of beaver dams on streams are well understood, broader coverage network models that predict where beaver dams can be built and highlight their impacts on connectivity across diverse drainage networks are lacking. Here we present a capacity model to assess the limits of riverscapes to support dam-building activities by beaver across physiographically diverse landscapes. We estimated dam capacity with freely and nationally-available inputs to evaluate seven lines of evidence: (1) reliable water source, (2) riparian vegetation conducive to foraging and dam building, (3) vegetation within 100 m of edge of stream to support expansion of dam complexes and maintain large colonies, (4) likelihood that channel-spanning dams could be built during low flows, (5) the likelihood that a beaver dam is likely to withstand typical floods, (6) a suitable stream gradient that is neither too low to limit dam density nor too high to preclude the building or persistence of dams, and (7) a suitable river that is not too large to restrict dam building or persistence. Fuzzy inference systems were used to combine these controlling factors in a framework that explicitly also accounts for model uncertainty. The model was run for 40,561 km of streams in Utah, USA, and portions of surrounding states, predicting an overall network capacity of 356,294 dams at an average capacity of 8.8 dams/km. We validated model performance using 2852 observed dams across 1947 km of streams. The model showed

  15. Wanaket Wildlife Area Management Plan : Five-Year Plan for Protecting, Enhancing, and Mitigating Wildlife Habitat Losses for the McNary Hydroelectric Facility.

    Energy Technology Data Exchange (ETDEWEB)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    2001-09-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding the enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management. Specific project objectives are related to protection and enhancement of wildlife habitats and are expressed in terms of habitat units (HU's). Habitat units were developed by the US Fish and Wildlife Service's Habitat Evaluation Procedures (HEP), and are designed to track habitat gains and/or losses associated with mitigation and/or development projects. Habitat Units for a given species are a product of habitat quantity (expressed in acres) and habitat quality estimates. Habitat quality estimates are developed using Habitat Suitability Indices (HSI). These indices are based on quantifiable habitat features such

  16. Seismic failure modes and seismic safety of Hardfill dam

    Directory of Open Access Journals (Sweden)

    Kun Xiong

    2013-04-01

    Full Text Available Based on microscopic damage theory and the finite element method, and using the Weibull distribution to characterize the random distribution of the mechanical properties of materials, the seismic response of a typical Hardfill dam was analyzed through numerical simulation during the earthquakes with intensities of 8 degrees and even greater. The seismic failure modes and failure mechanism of the dam were explored as well. Numerical results show that the Hardfill dam remains at a low stress level and undamaged or slightly damaged during an earthquake with an intensity of 8 degrees. During overload earthquakes, tensile cracks occur at the dam surfaces and extend to inside the dam body, and the upstream dam body experiences more serious damage than the downstream dam body. Therefore, under the seismic conditions, the failure pattern of the Hardfill dam is the tensile fracture of the upstream regions and the dam toe. Compared with traditional gravity dams, Hardfill dams have better seismic performance and greater seismic safety.

  17. Qu'Appelle River Dam, dam break analysis using advanced GIS tools for rapid modelling and inundation mapping

    Energy Technology Data Exchange (ETDEWEB)

    Bonin, D. [Hatch Energy, Winnipeg, MB (Canada); Campbell, C. [Saskatchewan Watershed Authority, Moose Jaw, SK (Canada); Groeneveld, J. [Hatch Energy, Calgary, AB (Canada)

    2008-07-01

    The South Saskatchewan River Project (SSRP) comprises a multi-purpose reservoir that provides water for conservation and irrigation, flood control, power generation, recreation, and municipal and industrial water supply. In addition to the 64 m high Gardiner Dam, the 27 m high Qu'Appelle River Dam and the 22 km long Lake Diefenbaker Reservoir, the SSRP also includes ancillary works. The Qu'Appelle River valley extends for 458 km before connecting to the Assiniboine River. The valley is incised up to 90 m in depth and is a popular cottaging and recreational area with several major communities located in the flood plain. In the event of a breach of the Qu'Appelle Dam, the discharge will increase from a normal maximum discharge of under 60 m{sup 3} per second to over 50,000 m{sup 3} per second. The Saskatchewan Watershed Authority (SWA) is responsible for ensuring safe development of the Province's water resources, without affecting reservoir or lake operations, and preventing damage from flooding, erosion or land slides. It is in the process of developing Hazard Assessments and emergency preparedness plans for each of their dams in accordance with the Canadian Dam Safety Guidelines. Studies using GIS technology and the hydrodynamic routing model HEC-RAS have been completed to evaluate the potential inundation that may result in the event of failure of the Qu'Appelle River Dam. These studies involved the development of a breach parameter model using a breach data set revised to better reflect the Qu'Appelle River Dam; the development of a dam break model for the Qu'Appelle River Dam and downstream river and flood plain; and, the use of this model to simulate two potential dam failure scenarios for the Qu'Appelle River Dam, notably failure during passage of the PMF and failure during fair weather conditions. Inundation maps have been prepared for the downstream Qu'Appelle River valley for each of the above events. 3 refs., 4

  18. Dam Design can Impede Adaptive Management of Environmental Flows: A Case Study from the Opuha Dam, New Zealand

    Science.gov (United States)

    Lessard, JoAnna; Murray Hicks, D.; Snelder, Ton H.; Arscott, David B.; Larned, Scott T.; Booker, Doug; Suren, Alastair M.

    2013-02-01

    The Opuha Dam was designed for water storage, hydropower, and to augment summer low flows. Following its commissioning in 1999, algal blooms (dominated first by Phormidium and later Didymosphenia geminata) downstream of the dam were attributed to the reduced frequency and magnitude of high-flow events. In this study, we used a 20-year monitoring dataset to quantify changes associated with the dam. We also studied the effectiveness of flushing flows to remove periphyton from the river bed. Following the completion of the dam, daily maximum flows downstream have exceeded 100 m3 s-1 only three times; two of these floods exceeded the pre-dam mean annual flood of 203 m3 s-1 (compared to 19 times >100 m3 s-1 and 6 times >203 m3 s-1 in the 8 years of record before the dam). Other changes downstream included increases in water temperature, bed armoring, frequency of algal blooms, and changes to the aquatic invertebrate community. Seven experimental flushing flows resulted in limited periphyton reductions. Flood wave attenuation, bed armoring, and a shortage of surface sand and gravel, likely limited the effectiveness of these moderate floods. Floods similar to pre-dam levels may be effective for control of periphyton downstream; however, flushing flows of that magnitude are not possible with the existing dam infrastructure. These results highlight the need for dams to be planned and built with the capacity to provide the natural range of flows for adaptive management, particularly high flows.

  19. The interplay of activists and dam developers : the case of Myanmar’s mega-dams

    NARCIS (Netherlands)

    Kirchherr, Julian|info:eu-repo/dai/nl/411261487; J. Charles, Katrina; Walton, Matthew J.

    2017-01-01

    Scholars investigating activism against large dam developments in Asia usually focus on those campaigning, but not on those the campaigns are aimed at–the dam developers. Yet the developers’ perspective is crucial to comprehensively understand the dynamics of social and environmental activism in

  20. Rates of consumption of juvenile salmonids and alternative prey fish by northern squawfish, walleyes, smallmouth bass, and channel catfish in John Day Reservoir, Columbia River

    International Nuclear Information System (INIS)

    Vigg, S.; Poe, T.P.; Prendergast, L.A.; Hansel, H.C.

    1991-01-01

    Adult northern squawfish Ptychocheilus oregonesis, walleyes Stizostedion vitreum, smallmouth bass Micropterus dolomieu, and channel catfish Ictalurus punctatus were sampled from four regions of John Day Reservoir from April to August 1983-1986 to quantify their consumption of 13 species of prey fish, particularly seaward-migrating juvenile Pacific salmon and steelhead (Oncorhynchus spp.). Consumption rates were estimated from field data on stomach contents and digestion rate relations determined in previous investigations. For each predator, consumption rates varied by reservoir area, month, time of day, and predator size or age. The greatest daily consumption of salmonids by northern squawfish and channel catfish occurred in the upper end of the reservoir below McNary Dam. Greatest daily predation by walleyes and smallmouth bass occurred in the middle and lower reservoir. Consumption rates of all predators were highest in July, concurrent with maximum temperature and abundance of juvenile salmonids. Feeding by the predators tended to peak after dawn and near midnight. Northern squawfish below McNary Dam exhibited this pattern, but fed mainly in the morning hours down-reservoir. The daily ration of total prey fish was highest for northern squawfish over 451 mm fork length, for walleyes 201-250 mm, for smallmouth bass 176-200 mm, and for channel catfish 401-450 mm. Averaged over all predator sizes and sampling months (April-August), the total daily ration (fish plus other prey) of smallmouth bass was about twice that of channel catfish, northern squawfish, and walleyes. However, northern squawfish was clearly the major predator on juvenile salmonids

  1. Factors influencing hysteresis characteristics of concrete dam deformation

    Directory of Open Access Journals (Sweden)

    Jia-he Zhang

    2017-04-01

    Full Text Available Thermal deformation of a concrete dam changes periodically, and its variation lags behind the air temperature variation. The lag, known as the hysteresis time, is generally attributed to the low velocity of heat conduction in concrete, but this explanation is not entirely sufficient. In this paper, analytical solutions of displacement hysteresis time for a cantilever beam and an arch ring are derived. The influence of different factors on the displacement hysteresis time was examined. A finite element model was used to verify the reliability of the theoretical analytical solutions. The following conclusions are reached: (1 the hysteresis time of the mean temperature is longer than that of the linearly distributed temperature difference; (2 the dam type has a large impact on the displacement hysteresis time, and the hysteresis time of the horizontal displacement of an arch dam is longer than that of a gravity dam; (3 the reservoir water temperature variation lags behind of the air temperature variation, which intensifies the differences in the horizontal displacement hysteresis time between the gravity dam and the arch dam; (4 with a decrease in elevation, the horizontal displacement hysteresis time of a gravity dam tends to increase, whereas the horizontal displacement hysteresis time of an arch dam is likely to increase initially, and then decrease; and (5 along the width of the dam, the horizontal displacement hysteresis time of a gravity dam decreases as a whole, while the horizontal displacement hysteresis time of an arch dam is shorter near the center and longer near dam surfaces.

  2. Enhancing mud supply from the Lower Missouri River to the Mississippi River Delta USA: Dam bypassing and coastal restoration

    Science.gov (United States)

    Kemp, G. Paul; Day, John W.; Rogers, J. David; Giosan, Liviu; Peyronnin, Natalie

    2016-12-01

    Sand transport to the Mississippi River Delta (MRD) remains sufficient to build wetlands in shallow, sheltered coastal bays fed by engineered diversions on the Mississippi River (MR) and its Atchafalaya River (AR) distributary. But suspended mud (silt & clay) flux to the coast has dropped from a mean of 390 Mt y-1 in the early 1950s, to 100 Mt y-1 since 1970. This fine-grained sediment travels deeper into receiving estuarine basins and plays a critical role in sustaining existing marshes. Virtually all of the 300 Mt y-1 of missing mud once flowed from the Missouri River (MOR) Basin before nearly 100 dams were built as part of the Pick-Sloan water development project. About 100 Mt y-1 is now intercepted by main-stem Upper MOR dams closed in 1953. But the remaining 200 Mt y-1 is trapped by impoundments built on tributaries to the Lower MOR in the 1950s and 1960s. Sediment flux during the post-dam high MOR discharge years of 1973, 1993 and 2011 approached pre-dam levels when tributaries to the Lower MOR, including the Platte and Kansas Rivers, contributed to flood flows. West bank tributaries drain a vast, arid part of the Great Plains, while those entering from the east bank traverse the lowlands of the MOR floodplain. Both provinces are dominated by highly erodible loess soils. Staunching the continued decline in MR fine-grained sediment flux has assumed greater importance now that engineered diversions are being built to reconnect the Lowermost MR to the MRD. Tributary dam bypassing in the Lower MOR basin could increase mud supply to the MRD by 100-200 Mt y-1 within 1-2 decades. Such emergency measures to save the MRD are compatible with objectives of the Missouri River Restoration and Platte River Recovery Programs to restore MOR riparian habitat for endangered species. Rapid mobilization to shunt fine-grained sediments past as many as 50 Lower MOR tributary dams in several U.S. states will undoubtedly require as much regional coordination and funding in the 21st

  3. Dams life; La vie des barrages

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    The paper reports on the conclusions of decennial and annual inspections of French dams. Dams surveillance is performed by the operators and consists in visual examinations and measurements. Concrete dams, in particular, always have more or less developed fissures with water sweating threw the concrete mass or the foundations. Old concrete often show low swelling phenomena which are measured too. (J.S.)

  4. [Office of Civilian Radioactive Waste Management] 1992 annual capacity report

    International Nuclear Information System (INIS)

    1993-03-01

    The Standard Contract for Disposal of Spent Nuclear Radioactive Waste (10 CFR Part 961) requires the Department of Energy (DOE) to issue an Annual Capacity Report (ACR) for planning purposes. This report is the fifth in the series published by DOE. In March 1993, DOE published the 1992 Acceptance Priority Ranking (APR) that established the order in which DOE will allocate projected acceptance capacity. As required by the Standard Contract, the acceptance priority ranking is based on the date the spent nuclear fuel (SNF) was permanently discharged, with the owners of the oldest SNF, on an industry-wide basis, given thehighest priority. The 1992 ACR applies the projected waste acceptance rates in Table 2.1 to the 1992 APR, resulting in individual allocations for the owners and generators of the SNF. These allocations art, listed in detail in the Appendix, and summarized in Table 3.1. The projected waste acceptance rates for SNF presented in Table 2.1 assume a site for a Monitored Retrievable Storage (MRS) facility will tic obtained; the facility will initiate operations in 1998; and the statutory linkages between the MRS facility and the repository set forth in the Nuclear Waste Policy Act of 1982, as amended (NWPA), will be modified. During the first ten years following projected commencement of Civilian Radioactive Waste Management System (CRWMS) operation, the total quantity of SNF that could be accepted is projected to be 8200 metric tons of uranium (MTU). This is consistent with the storage capacity licensing conditions imposed on an MRS facility by the NWPA. The annual acceptance rates provide an approximation of the system throughput and are subject to change as the program progresses

  5. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, Barry; Evarts, Les [Confederated Salish and Kootenai Tribes

    2009-08-06

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research

  6. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2007.

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, Barry; Evarts, Les [Confederated Salish and Kootenai Tribes

    2008-12-22

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research

  7. Dam safety management in Victoria (Australia)

    International Nuclear Information System (INIS)

    Adem, J.

    1996-01-01

    The Victoria state government's decision to make dam owners accountable for safety and upkeep of their dams was reported. To give effect to this decision a series of guidelines have been developed which outline the required activities and skills to ensure that dams are properly managed within a framework of 'light-handed' regulation. The guidelines are also intended to ensure that dam management becomes an integral part of the business decision making process, not just a set of prescribed technical procedures. Details of the direction being taken and the proposed controls to ensure compliance with national and international standards were described. 4 refs., 2 figs

  8. Large Dam Effects on Flow Regime and Hydraulic Parameters of river (Case study: Karkheh River, Downstream of Reservoir Dam

    Directory of Open Access Journals (Sweden)

    Farhang Azarang

    2017-06-01

    Full Text Available Introduction: The critical role of the rivers in supplying water for various needs of life has led to engineering identification of the hydraulic regime and flow condition of the rivers. Hydraulic structures such dams have inevitable effects on their downstream that should be well investigated. The reservoir dams are the most important hydraulic structures which are the cause of great changes in river flow conditions. Materials and Methods: In this research, an accurate assessment was performed to study the flow regime of Karkheh river at downstream of Karkheh Reservoir Dam as the largest dam in Middle East. Karkheh River is the third waterful river of Iran after Karun and Dez and the third longest river after the Karun and Sefidrud. The Karkheh Dam is a large reservoir dam built in Iran on the Karkheh River in 2000. The Karkheh Reservoir Dam is on the Karkheh River in the Northwestern Khouzestan Province, the closest city being Andimeshk to the east. The part of Karkheh River, which was studied in this research is located at downstream of Karkheh Reservoir Dam. This interval is approximately 94 km, which is located between PayePol and Abdolkhan hydrometric stations. In this research, 138 cross sections were used along Karkheh River. Distance of cross sections from each other was 680m in average. The efficient model of HEC-RAS has been utilized to simulate the Karkheh flow conditions before and after the reservoir dam construction using of hydrometric stations data included annually and monthly mean discharges, instantaneous maximum discharges, water surface profiles and etc. Three defined discharges had been chosen to simulate the Karkheh River flow; maximum defined discharge, mean defined discharge and minimum defined discharge. For each of these discharges values, HEC-RAS model was implemented as a steady flow of the Karkheh River at river reach of study. Water surface profiles of flow, hydraulic parameters and other results of flow regime in

  9. Exporting dams: China's hydropower industry goes global.

    Science.gov (United States)

    McDonald, Kristen; Bosshard, Peter; Brewer, Nicole

    2009-07-01

    In line with China's "going out" strategy, China's dam industry has in recent years significantly expanded its involvement in overseas markets. The Chinese Export-Import Bank and other Chinese financial institutions, state-owned enterprises, and private firms are now involved in at least 93 major dam projects overseas. The Chinese government sees the new global role played by China's dam industry as a "win-win" situation for China and host countries involved. But evidence from project sites such as the Merowe Dam in Sudan demonstrates that these dams have unrecognized social and environmental costs for host communities. Chinese dam builders have yet to adopt internationally accepted social and environmental standards for large infrastructure development that can assure these costs are adequately taken into account. But the Chinese government is becoming increasingly aware of the challenge and the necessity of promoting environmentally and socially sound investments overseas.

  10. Monitoring the migrations of wild Snake River spring/summer chinook salmon smolts, 1995. Annual report

    International Nuclear Information System (INIS)

    Achord, S.; Eppard, M.B.; Sandford, B.P.; Matthews, G.M.

    1996-09-01

    We PIT tagged wild spring/summer chinook-salmon parr in the Snake River Basin in 1994 and subsequently monitored these fish during their smolt migration through Lower Granite, Little Goose, Lower Monumental, McNary, John Day, and Bonneville Darns during spring, summer, and fall 1995. This report details our findings. The goals of this study are to (1) characterize the migration timing of different wild stocks of Snake River spring/summer chinook salmon smolts at dams on the Snake and Columbia Rivers, (2) determine if consistent patterns are apparent, and (3) determine what environmental factors influence migration timing

  11. Measuring and managing safety at Wahleach Dam

    International Nuclear Information System (INIS)

    Salmon, G. M.; Cattanach, J. D.; Hartford, D. N. D.

    1996-01-01

    Safety improvements recently implemented at the Wahleach Dam were described as one of the first instances in international dam safety practice where risk concepts have been used in conjunction with acceptable risk criteria to evaluate safety of a dam relative to required level of safety. Erosion was identified as the greatest threat to the safety of the dam. In addressing the deficiencies B.C. Hydro formulated a process which advocates a balanced level of safety,i.e. the probability of failure multiplied by the consequences of failure, integrated over a range of initiators. If the risk posed by the dam is lower than a 'tolerable' risk, the dam is considered to be safe enough. In the case of the Wahleach Dam, the inflow design flood (IDF) was selected to be about one half of the probable maximum flow (PMF), hence it was more likely than not that the spillway could pass floods up to and including the PMF. By accepting the determined level of risk, expenditures of several million dollars for design and construction of dam safety improvements were made redundant. Another byproduct of this new concept of risk assessment was the establishment of improved life safety protection by means of an early warning system for severe floods through the downstream community and emergency authorities. 3 refs., 5 tabs

  12. Final report on fiscal year 1992 activities for the environmental monitors line-loss study

    International Nuclear Information System (INIS)

    Kenoyer, J.L.

    1993-01-01

    The work performed on this Environmental Monitors Line-Loss Study has been performed under Contract Numbers MLW-SVV-073750 and MFH-SVV-207554. Work on the task was initiated mid-December 1991, and this report documents and summarizes the work performed through January 18, 1993. The sections included in this report summarize the work performed on the Environmental Monitors Line-Loss Study. The sections included in this report are arranged to reflect individual sub-tasks and include: descriptions of measurement systems and procedures used to obtain cascade impactor samples and laser spectrometer measurements from multiple stacks and locations; information on data acquisition, analyses, assessment, and software; discussion of the analyses and measurement results from the cascade impactor and laser spectrometer systems and software used; discussion on the development of general test methods and procedures for line-loss determinations; an overall summary and specific conclusions that can be made with regard to efforts performed on this task during FY 1992 and FY 1993. Supporting information for these sections is included in this report as appendices

  13. Large dams and alluvial rivers in the Anthropocene: The impacts of the Garrison and Oahe Dams on the Upper Missouri River

    Science.gov (United States)

    Skalak, Katherine; Benthem, Adam J.; Schenk, Edward R.; Hupp, Cliff R.; Galloway, Joel M.; Nustad, Rochelle A.; Wiche, Gregg J.

    2013-01-01

    The Missouri River has had a long history of anthropogenic modification with considerable impacts on river and riparian ecology, form, and function. During the 20th century, several large dam-building efforts in the basin served the needs for irrigation, flood control, navigation, and the generation of hydroelectric power. The managed flow provided a range of uses, including recreation, fisheries, and habitat. Fifteen dams impound the main stem of the river, with hundreds more on tributaries. Though the effects of dams and reservoirs are well-documented, their impacts have been studied individually, with relatively little attention paid to their interaction along a river corridor. We examine the morphological and sedimentological changes in the Upper Missouri River between the Garrison Dam in ND (operational in 1953) and Oahe Dam in SD (operational in 1959). Through historical aerial photography, stream gage data, and cross sectional surveys, we demonstrate that the influence of the upstream dam is still a major control of river dynamics when the backwater effects of the downstream reservoir begin. In the “Anthropocene”, dams are ubiquitous on large rivers and often occur in series, similar to the Garrison Dam Segment. We propose a conceptual model of how interacting dams might affect river geomorphology, resulting in distinct and recognizable morphologic sequences that we term “Inter-Dam sequence” characteristic of major rivers in the US.

  14. Stability of earth dam with a vertical core

    Directory of Open Access Journals (Sweden)

    Orekhov Vyacheslav Valentinovich

    2016-01-01

    Full Text Available Earth dam with impervious element in the form of asphaltic concrete core is currently the most promising type of earth dams (due to simple construction technology and universal service properties of asphaltic concrete and is widely used in the world. However, experience in the construction and operation of high dams (above 160 m is not available, and their work is scarcely explored. In this regard, the paper discusses the results of computational prediction of the stress-strain state and stability of a high earth dam (256 m high with the core. The authors considered asphaltic concrete containing 7 % of bitumen as the material of the core. Gravel was considered as the material of resistant prisms. Design characteristics of the rolled asphaltic concrete and gravel were obtained from the processing of the results of triaxial tests. The calculations were performed using finite element method in elastoplastic formulation and basing on the phased construction of the dam and reservoir filling. The research shows, that the work of embankment dam with vertical core during filling of the reservoir is characterized by horizontal displacement of the lower resistant prism in the tailrace and the formation of a hard wedge prism descending along the core in the upper resistant prism. The key issue of the safety assessment is to determine the safety factor of the overall stability of the dam, for calculation of which the destruction of the earth dam is necessary, which can be done by reducing the strength properties of the dam materials. As a results of the calculations, the destruction of the dam occurs with a decrease in the strength characteristics of the materials of the dam by 2.5 times. The dam stability depends on the stability of the lower resistant prism. The destruction of its slope occurs on the classical circular-cylindrical surface. The presence of a potential collapse surface in the upper resistant prism (on the edges of the descending wedge does

  15. The changing hydrology of a dammed Amazon

    Science.gov (United States)

    Timpe, Kelsie; Kaplan, David

    2017-01-01

    Developing countries around the world are expanding hydropower to meet growing energy demand. In the Brazilian Amazon, >200 dams are planned over the next 30 years, and questions about the impacts of current and future hydropower in this globally important watershed remain unanswered. In this context, we applied a hydrologic indicator method to quantify how existing Amazon dams have altered the natural flow regime and to identify predictors of alteration. The type and magnitude of hydrologic alteration varied widely by dam, but the largest changes were to critical characteristics of the flood pulse. Impacts were largest for low-elevation, large-reservoir dams; however, small dams had enormous impacts relative to electricity production. Finally, the “cumulative” effect of multiple dams was significant but only for some aspects of the flow regime. This analysis is a first step toward the development of environmental flows plans and policies relevant to the Amazon and other megadiverse river basins. PMID:29109972

  16. 1992 Toxic Chemical Release Inventory: Emergency Planning and Community Right-To-Know-Act of 1986 Section 313

    International Nuclear Information System (INIS)

    1993-07-01

    Section 313 of the Emergency Planning and Community Right-To-Know Act of 1986 (EPCRA) requires the annual submittal of toxic chemical release information to the US Environmental Protection Agency (EPA). The following document is the July 1993 submittal of the EPCRA Toxic Chemical Release Inventory Report (Form R). Included is a Form R for chlorine and for lead, the two chemicals used in excess of the established regulatory thresholds at the Hanford Site by the US Department of Energy, Richland Operations Office and its contractors during calendar year 1992

  17. Department of Defense Extract of the Budget of the United States Government for Fiscal Years 1992 and 1993

    Science.gov (United States)

    1991-02-04

    and for end stage damages. in the 26 States that have lim- renal disease (ESRD) beneficiaries by making ited total damages, malpractice rates have...3,097 3,061 2,906 229 Part Four-8 THE BUDGET FOR FISCAL YE 1992 Table A-2. $WET AUTHOKIIY ANO OULAYS BY FUNCION ANO P (h ran f ws; Ord ~ ~ ~ IB WWii’ :w

  18. Isotope technique in JPS dam surveillance: its potential

    International Nuclear Information System (INIS)

    Sabri Hassan

    2006-01-01

    Controlling seepage is one of the most important requirements for safe dams. Any leakage at an earth embankment may be potentially dangerous since rapid internal erosion may quickly enlarge an initially minor defect. Thus dam owners need to have thorough surveillance programs that can forewarn of impending problems from seepage or other factors influencing the safety of dams. In carrying out dam surveillance works, all possible efforts should be considered and foreseeing the potential of isotope technique, JPS (Department of Irrigation and Drainage, Malaysia) and MINT (Malaysian Institute for Nuclear Technology Research) participated actively in the UNDP/RCA/IAEA program under RAS/8/093 project sponsored by the International Atomic Energy Agency (IAEA). Through these activities, it was noted that the technique demonstrated very promising potentials such as in assisting dam site selections, site investigations, watershed studies, dam and reservoir design, leakage investigations and sediments related issues, the two latter ones being relatively critical during the operational life of the dam. Establishment of baseline isotopic characteristics (or fingerprint), hydrochemistry, electrical conductivity and temperature profiles is underway for all JPS dams to be later utilized in diagnosing seepage related issues it is suggested that application of this technique be extended to other dam owners nationwide. (Author)

  19. Bench-scale testing of on-line control of column flotation using a novel analyzer. Third quarterly technical progress report, April 1, 1993--June 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-24

    This document contains the third quarterly technical progress report for PTI`s Bench-Scale Testing Project of a circuit integrating PTI`s KEN-FLOTETM Column Flotation Technology and PTI`s On-Line Quality Monitor and Control System. The twelve-month project involves installation and testing of a 200--300 lb/hr. bench-scale flotation circuit at PETC`s Coal Preparation Process Research Facility (CPPRF) for two bituminous coals (Upper Freeport and Pittsburgh No. 8 Seam Raw Coals). Figure 1 contains the project plan, as well as the approach to completing the major tasks within the twelve-month project schedule. The project is broken down into three phases, which include: Phase I -- Preparation: The preparation phase was performed principally at PTI`s Calumet offices from October through December, 1992. It involved building of the equipment and circuitry, as well as some preliminary design and equipment testing; Phase II -- ET Circuit Installation and Testing: This installation and testing phase of the project was performed at PETC`s CPPRF from January through June, 1993, and was the major focus of the project. It involved testing of the continuous 200--300 lb/hr. circuit; and Phase III -- Project Finalization: The project finalization phase is occurring from July through September, 1993, at PTI`s Calumet offices and involves finalizing analytical work and data evaluation, as well as final project reporting. This Third Quarterly Technical Progress Report principally summarizes the results from the benchscale testing with the second coal (Pittsburgh No. 8 Seam Coal), which occurred in April through June, 1993. It also contains preliminary economic evaluations that will go into the Final Report, as well as the plan for the final reporting task.

  20. Numerical modelling for stability of tailings dams

    OpenAIRE

    Auchar, Muhammad; Mattsson, Hans; Knutsson, Sven

    2013-01-01

    A tailings dam is a large embankment structure that is constructed to store the waste from the mining industry. Stability problems may occur in a tailings dam due to factors such as quick rate of raising, internal erosion and liquefaction. The failure of a tailings dam may cause loss of human life and environmental degradation. Tailings Dams must not only be stable during the time the tailings storage facility is in operation, but also long time after the mine is closed. In Sweden, the licens...

  1. Dams and transnational advocacy: Political opportunities in transnational collective action

    Science.gov (United States)

    Fu, Teng

    Possible arguments to explain the gradual decline in big dam development and its site transferring from developed to developing countries include technical, economic, and political factors. This study focuses on the political argument---the rise of transnational anti-dam advocacy and its impact on state policy-making. Under what conditions does transnational anti-dam advocacy matter? Under what conditions does transnational advocacy change state dam policies (delay, scale down, or cancel)? It examines the role of transnational anti-dam actors in big dam building in a comparative context in Asia. Applying the social movement theory of political opportunity structure (POS) and using the qualitative case-study method, the study provides both within-case and cross-case analyses. Within-case analysis is utilized to explain the changing dynamics of big dam building in China (Three Gorges Dam and proposed Nu/Salween River dam projects), and to a lesser extent, Sardar Sarovar Project in India and Nam Theun 2 Dam in Laos. Different domestic and international POS (DPOS and IPOS) impact the strategies and outcomes of anti-dam advocacies in these countries. The degree of openness of the POS directly affects the capacity of transnational efforts in influencing state dam policies. The degree of openness or closure is measured by specific laws, institutions, discourse, or elite allies (or the absence of these) for the participation of non-state actors on big dam issues at a particular moment. This degree of openness is relative, varying over time, across countries and regions. This study finds that the impact of transnational anti-dam activism is most effective when both DPOS and IPOS are relatively open. Transnational anti-dam advocacy is least effective in influencing state dam policies when both DPOS and IPOS are relatively closed. Under a relatively open DPOS and closed IPOS, transnational anti-dam advocacy is more likely to successfully change state dam policies and even

  2. Environmental impacts of small dams on agriculture and ground water development: a case study of Khan pur Dam, Pakistan

    International Nuclear Information System (INIS)

    Ejaz, N.; Shahmim, M.A.; Elahi, A.; Khan, N.M.

    2012-01-01

    The water scarcity issues are increasing through out the world. Pakistan is also facing water crises and its water demands are increasing every day. During this research it is investigated that small dams are playing an important role for the sustainability of groundwater and agriculture. The main objective of this study was to assess the environmental impacts of small dam on agricultural and ground water. Proper planning and management of small dams may improve the sustainable agriculture in Pakistan. It is also concluded that small dams are significantly contributing towards economy, environment, local climate, recreational activities and crop production. Small dams can also be utilized for the production of electricity at local level. On the other hand, water management issues can be resolved by the involvement of local farmer's associations. Water losses through seepage, unlined channels and old irrigation methods are most critical in developing world. Considering the overall positive environmental impacts, construction of small dams must be promoted. (author)

  3. Large dams and risk management

    International Nuclear Information System (INIS)

    Cazelais, N.

    2003-01-01

    In July 1996, Quebec's Saguenay region was subjected to intensive rainfall which caused severe floods and uncontrolled release of several reservoirs, resulting in extensive damage to dam structures and reservoirs. The probability of occurrence for that disaster was 1:10,000. Following the disaster, the Quebec government established a dam management body entitled the Commission scientifique et technique sur la gestion des barrages, which pointed out several safety shortcomings of existing dams. Many were either very old or had undergone significant function change without being subsequently re-evaluated. A report by the Commission stated that damage following the floods could have been limited if the design and operating standards of the dams had been more stringent. A Dam Safety Act was adopted by the Quebec National Assembly on May 30, 2000 following recommendations to retain safer structures. The Act demands regular reporting of operating procedures. Seismic activity was noted as being a topic that requires in-depth examination since Quebec's St. Lawrence Valley, particularly the Charlevoix region, is one of Canada's largest seismic zones. The other is on the west coast in British Columbia. Earthquakes in Quebec are less intense than the ones in British Columbia, but they have higher frequency content which exerts a quasi-resonance wave effect which impacts roads, bridges, buildings and hydroelectric generating facilities. Hydro-Quebec is a public utility which owns 563 retaining structures, of which 228 are ranked as large dams that measure more than 15 metres high, 400 metres long and with a reservoir capacity of more than 1 million cubic metres of water. Hydro-Quebec addresses hydrological, seismic, technological and human risks through a dam safety procedure that includes structured plans for choosing best alternatives through staged exercises. Hazard levels are minimized through the adoption of emergency, prevention and alleviation measures. The utility

  4. Oak Ridge Reservation Federal Facility Agreement quarterly report for the Environmental Restoration Program, Volume 1, October--December 1992

    International Nuclear Information System (INIS)

    1993-01-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program which are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered is October through December 1992(first quarter of FY 1993). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been formally approved as FY 1993 commitments. This first section is followed by: significant accomplishments; technical status at Y-12 operable units, Oak Ridge National Laboratory, Oak Ridge K-25 site, Clinch River, Oak Ridge Associated Universities, and technical oversight and technical programs; and response action contractor assignments

  5. 78 FR 62627 - Sam Rayburn Dam Rate

    Science.gov (United States)

    2013-10-22

    ..., Wholesale Rates for Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative, Inc. (Contract No... Schedule SRD-08, Wholesale Rates for Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative... ADMINISTRATION RATE SCHEDULE SRD-13 \\1\\ WHOLESALE RATES FOR HYDRO POWER AND ENERGY SOLD TO SAM RAYBURN DAM...

  6. Evaluatie Dam tot Damloop 2014

    NARCIS (Netherlands)

    Deutekom-Baart de la Faille, Marije

    In het weekend van 20 en 21 september 2014 vond de 30ste editie van de Dam tot Damloop plaats. Onderzoekers van de Hogeschool van Amsterdam en Hogeschool Inholland hebben bij de Dam tot Damloop een evaluatieonderzoek uitgevoerd met als doel het vinden van aanknopingspunten voor het structureel

  7. The Total Risk Analysis of Large Dams under Flood Hazards

    Directory of Open Access Journals (Sweden)

    Yu Chen

    2018-02-01

    Full Text Available Dams and reservoirs are useful systems in water conservancy projects; however, they also pose a high-risk potential for large downstream areas. Flood, as the driving force of dam overtopping, is the main cause of dam failure. Dam floods and their risks are of interest to researchers and managers. In hydraulic engineering, there is a growing tendency to evaluate dam flood risk based on statistical and probabilistic methods that are unsuitable for the situations with rare historical data or low flood probability, so a more reasonable dam flood risk analysis method with fewer application restrictions is needed. Therefore, different from previous studies, this study develops a flood risk analysis method for large dams based on the concept of total risk factor (TRF used initially in dam seismic risk analysis. The proposed method is not affected by the adequacy of historical data or the low probability of flood and is capable of analyzing the dam structure influence, the flood vulnerability of the dam site, and downstream risk as well as estimating the TRF of each dam and assigning corresponding risk classes to each dam. Application to large dams in the Dadu River Basin, Southwestern China, demonstrates that the proposed method provides quick risk estimation and comparison, which can help local management officials perform more detailed dam safety evaluations for useful risk management information.

  8. Analysis the dynamic response of earth dam in free vibration and forced by introducing the effect of the interaction dam foundation

    Directory of Open Access Journals (Sweden)

    Malika Boumaiza

    2018-01-01

    Full Text Available The present study concerns the analysis of the dynamic response of earth dam, in free and forced vibration (under the effect of earthquake using the finite element method. The analysis is carried out at the end of dam construction without filling. The behavior of the dam materials and the foundation is linear elastic. In free vibration, to better understand the effect of the dam foundation interaction, we will take into account different site conditions and see their influence on the free vibration characteristics of the dam. In forced vibration, to study the seismic response of the dam, the system is subjected to the acceleration of the Boumerdes earthquake of May 21, 2003 recorded at the station n ° 2 of the dam of Kaddara in the base, with a parametric study taking into account the influence of the main parameters such as the mechanical properties of the soil: rigidity, density.

  9. Ice interactions at a dam face

    Energy Technology Data Exchange (ETDEWEB)

    Morse, B.; Morse, J.; Beaulieu, P.; Pratt, Y. [Laval Univ., Quebec City, PQ (Canada). Dept. of Civil Engineering; Stander, E. [State Univ. of New York, Cobleskill College, Cobleskill, NY (United States). Dept. of Natural Sciences; Cote, A.; Tarras, A.; Noel, P. [Hydro-Quebec, Varennes, PQ (Canada). IREQ

    2009-07-01

    This paper reported on a joint research project between Laval University and Hydro-Quebec to study ice forces on dams in an effort to harmonize design criteria and develop mitigation strategies. This paper introduced the project and explored some of the preliminary results of the 2007-2008 field season. Ice displacement, ice stresses and ice forces on the LaGabelle dam were measured at several locations. The paper identified and discussed the complex relationships between data sets and discussed the spatial-temporal variability of the ice forces and its impact on design criteria. The project objective was to develop design criteria for ice forces on dams and to provide a scientific basis for interpreting and harmonizing existing recommended criteria. The methodology and site description were presented. It was concluded that the ice processes in a reservoir near a dam face subject to water fluctuations are quite complex. Therefore, in order to know the real average pressure on the dam, a significant amount of panels are required, having important implications for determining safe design values. 9 refs., 10 figs.

  10. Thermal effects of dams in the Willamette River basin, Oregon

    Science.gov (United States)

    Rounds, Stewart A.

    2010-01-01

    Methods were developed to assess the effects of dams on streamflow and water temperature in the Willamette River and its major tributaries. These methods were used to estimate the flows and temperatures that would occur at 14 dam sites in the absence of upstream dams, and river models were applied to simulate downstream flows and temperatures under a no-dams scenario. The dams selected for this study include 13 dams built and operated by the U.S. Army Corps of Engineers (USACE) as part of the Willamette Project, and 1 dam on the Clackamas River owned and operated by Portland General Electric (PGE). Streamflows in the absence of upstream dams for 2001-02 were estimated for USACE sites on the basis of measured releases, changes in reservoir storage, a correction for evaporative losses, and an accounting of flow effects from upstream dams. For the PGE dam, no-project streamflows were derived from a previous modeling effort that was part of a dam-relicensing process. Without-dam streamflows were characterized by higher peak flows in winter and spring and much lower flows in late summer, as compared to with-dam measured flows. Without-dam water temperatures were estimated from measured temperatures upstream of the reservoirs (the USACE sites) or derived from no-project model results (the PGE site). When using upstream data to estimate without-dam temperatures at dam sites, a typical downstream warming rate based on historical data and downstream river models was applied over the distance from the measurement point to the dam site, but only for conditions when the temperature data indicated that warming might be expected. Regressions with measured temperatures from nearby or similar sites were used to extend the without-dam temperature estimates to the entire 2001-02 time period. Without-dam temperature estimates were characterized by a more natural seasonal pattern, with a maximum in July or August, in contrast to the measured patterns at many of the tall dam sites

  11. The Political Ecology of Chinese Large Dams in Cambodia: Implications, Challenges and Lessons Learnt from the Kamchay Dam

    Directory of Open Access Journals (Sweden)

    Giuseppina Siciliano

    2016-09-01

    Full Text Available Given the opportunities offered by foreign investment in energy infrastructure mostly by Chinese firms, the Government of Cambodia is giving high priority to developing hydropower resources for reducing energy poverty and powering economic growth. Using a “Political ecology of the Asian drivers” framework, this paper assesses China’s involvement in the development of large dams’ in Cambodia and its impacts on the access of natural resources such as water and energy by dam builders, local communities and the government. This analysis is based on 61 interviews and 10 focus group discussions with affected communities, institutional actors, Chinese dam builders and financiers in relation to the first large Chinese dam built in Cambodia: the Kamchay dam. Based on the results of the analysis this paper makes recommendations on how to improve the planning, implementation and governance of future large dams in Cambodia.

  12. Douglas County Dam Breach Inundation Areas

    Data.gov (United States)

    Kansas Data Access and Support Center — Dam breach analysis provides a prediction of the extent and timing of flooding from a catastrophic breach of the dams. These results are sufficient for developing...

  13. Expectations of immortality: dam safety management into the next millennium

    Energy Technology Data Exchange (ETDEWEB)

    Palmer, M.D. [Tonkin and Taylor International Ltd., Auckland, (New Zealand)

    1999-07-01

    Topics concerning the problems associated with older and aging dams are considered including: what can be done to extent the lifetime of an old dam, the decision to decommission a dam based on a value judgment that the risk of maintaining the dam is too great for society's acceptance, the possibility of change in the level of risk tolerance with time in a technological environment, traditional surveillance methods used by dam owners in the Y2K situation, and the unreality of dam immortality. Trends and means for preserving older dams for their owner's purposes are outlined, as well as their lifetime compared to that of the downstream systems they serve. Despite the fact that we live in a throwaway society, dam owners cannot just leave their dam asset when they are through with using it. Someone has to maintain the dam, or ensure that it is safely decommissioned when the owner is finished with it. On a worldwide scale the available pool of experienced dam engineers is shrinking. This problem needs to be addressed by a shift towards operating and dam safety management skills based on a firm awareness of dam design principles. A shift in society's expectations has occurred such that dam designers and owners must now recognize the impact a dam can have both on its natural and social environments. Because of the increasing emphasis on paying attention to the impacts of people's activities on the planet, engineers more than anyone else must have a significant influence in that direction. 9 refs.

  14. Expectations of immortality: dam safety management into the next millennium

    International Nuclear Information System (INIS)

    Palmer, M.D.

    1999-01-01

    Topics concerning the problems associated with older and aging dams are considered including: what can be done to extent the lifetime of an old dam, the decision to decommission a dam based on a value judgment that the risk of maintaining the dam is too great for society's acceptance, the possibility of change in the level of risk tolerance with time in a technological environment, traditional surveillance methods used by dam owners in the Y2K situation, and the unreality of dam immortality. Trends and means for preserving older dams for their owner's purposes are outlined, as well as their lifetime compared to that of the downstream systems they serve. Despite the fact that we live in a throwaway society, dam owners cannot just leave their dam asset when they are through with using it. Someone has to maintain the dam, or ensure that it is safely decommissioned when the owner is finished with it. On a worldwide scale the available pool of experienced dam engineers is shrinking. This problem needs to be addressed by a shift towards operating and dam safety management skills based on a firm awareness of dam design principles. A shift in society's expectations has occurred such that dam designers and owners must now recognize the impact a dam can have both on its natural and social environments. Because of the increasing emphasis on paying attention to the impacts of people's activities on the planet, engineers more than anyone else must have a significant influence in that direction. 9 refs

  15. Langbjorn dam : adaptation for safe discharge of extreme floods

    Energy Technology Data Exchange (ETDEWEB)

    Yang, J. [Vattenfall Research and Development, Alvkarleby (Sweden); Ericsson, H.; Gustafsson, A. [SWECO, Stockholm (Sweden); Stenmark, M. [Vattenfall Power Consultant, Ludvika (Sweden); Mikaelsson, J. [Vattenfall Nordic Generation, Bispgarden (Sweden)

    2007-07-01

    The Langbjorn hydropower scheme, composed of an embankment dam with an impervious core of compacted moraine, a spillway section and a powerhouse, is located on the Angermanalven River in north Sweden. The scheme was commissioned in 1959 and is owned by Vattenfall. As part of its dam safety program, Vattenfall plans to adapt and refurbish many of its dams to the updated design-flood and dam-safety guidelines. Langbjorn is classified as a high hazard dam, as its updated design flood is 30 per cent higher than the existing spillway capacity. Safety evaluations were conducted for the Langbjorn dam, and, as required by the higher safety standard, there was a need to rebuild the dam, so that the design flood could be safely released without causing failure of the dam. This paper provided information on the Langbjorn hydropower scheme and discussed the planned rebuilding measures. For example, the design flood was accommodated by allowing a temporary raise of the water level by 1.3 metres above the legal retention reservoir level, which required heightening and reinforcement of the dam. Specifically, the paper discussed measures to increase the discharge capacity; handling and control of floating debris; improvement and heightening of impervious core in left and right connecting dam and abutment; measures to increase the stability of the left steep riverbank; and measures to increase stability of the spillway monoliths and the left guide wall. In addition, the paper discussed measures to ensure stability of the downstream stretch of the river bank and increase instrumentation. The paper also presented the results of hydraulic investigations to investigate the risk of erosion downstream of the dam. It was concluded that the dam could discharge the design flood and that the stability of the dam was improved and judged to be satisfactory during all foreseeable conditions. 2 refs., 8 figs.

  16. The mathematics of dam safety

    Energy Technology Data Exchange (ETDEWEB)

    Widmann, R. [Osterreichische Gesellschaft fuer Geomechanik, Salzburg (Austria)

    1997-05-01

    The safety of a dam is determined by its design, construction and supervision during operation. High arch dam failures have dropped dramatically since the early part of this century. An essential part of the success story relates to improved measurement techniques that can detect earlier unexpected behaviour that may lead to failure. (UK)

  17. Automatic dam concrete placing system; Dam concrete dasetsu sagyo no jidoka system

    Energy Technology Data Exchange (ETDEWEB)

    Yoneda, Y; Hori, Y; Nakayama, T; Yoshihara, K; Hironaka, T [Okumura Corp., Osaka (Japan)

    1994-11-15

    An automatic concrete placing system was developed for concrete dam construction. This system consists of the following five subsystems: a wireless data transmission system, an automatic dam concrete mixing system, a consistency determination system, an automatic dam concrete loading and transporting system, and a remote concrete bucket opening and closing system. The system includes the following features: mixing amount by mixing ratio and mixing intervals can be instructed from a concrete placing site by using a wireless handy terminal; concrete is mixed automatically in a batcher plant; a transfer car is started, and concrete is charged into a bucket automatically; the mixed concrete is determined of its properties automatically; labor cost can be reduced, the work efficiency improved, and the safety enhanced; and the system introduction has resulted in unattended operation from the aggregate draw-out to a bunker line, manpower saving of five persons, and reduction in cycle time by 10%. 11 figs., 2 tabs.

  18. Dam safety investigations of the concrete structures of Hugh Keenleyside dam

    International Nuclear Information System (INIS)

    Hanna, A.W.; Nunn, J.O.H.; Cornish, L.; Northcott, P.

    1993-01-01

    The Hugh Keenleyside dam is located on the Columbia River in southeastern British Columbia, and impounds Arrow Lakes Reservoir which has a live storage of 8.8 km 3 and drains an area of 36,000 km 2 . It consists of a number of concrete structures, with a total length of 360 m and a maximum height of 58 m, and an earthfill embankment which spans across the original river channel. The 450 m long zoned earthfill dam is founded on pervious alluvium over 150 m deep. It has a sloping impervious core constructed from glacial till which extends 670 m upstream of the dam. This impervious blanket extends over the full width of the reservoir and is connected to the upstream face of the concrete structures. The results of a dam safety study, which was carried out due to the presence of high uplift pressures at some parts of the foundation, and stability concerns, are presented. The investigation concluded that the high uplift pressures were due to a localized defect in the upstream blanket and did not indicate any general deterioration of the blanket. Techniques that were found to be of particular use in the study for defining the source and nature of the foundation defects were: temperature surveys of flows from piezometers, cells and drains; air injection tests; and pressure response testing of cells, piezometers and drains to establish foundation interconnections. The concrete structures met the stability criteria for all load cases considered except for the navigation lock and the low level outlets. 3 refs., 6 figs

  19. H-Area Seepage Basins groundwater monitoring report -- third and fourth quarters 1993. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Butler, C.T.

    1994-03-01

    During the second half of 1993, the groundwater at the H-Area Seepage Basins (HASB) was monitored in compliance with the September 30, 1992, modification of South Carolina Hazardous Waste Permit SC1-890-008-989. A detailed description of the uppermost aquifer is included in the Resource Conservation and Recovery Act Part B post-closure care permit application for the H-Area Hazardous Waste Management Facility submitted to the South Carolina Department of Health and Environmental Control (SCDHEC) in December 1990. Beginning first quarter 1993, the HASB`s Groundwater Protection Standard (GWPS), established in Appendix 3D-A of the cited permit, became the standard for comparison. Historically as well as currently, nitrate, nonvolatile beta, and tritium have been among the primary constituents to exceed standards. Other radionuclides and hazardous constitutents also exceeded the GWPS in the groundwater at the HASB (notably aluminum, iodine-129, strontium-90, technetium-99, and zinc) during the second half of 1993. Elevated constituents were found primarily in Aquifer Zone 2B{sub 2} and in the upper portion of Aquifer Zone 2B{sub 1}. However, constituents exceeding standards also occurred in several wells screened in the lower portion of Aquifer Zone 2B{sub 1} and Aquifer Unit 2A. Isoconcentration/isoactivity maps include in this report indicate both the concentration/activity and extent of the primary contaminants in each of the three hydrostratigraphic units during the second half of 1993. Water-level maps indicate that the groundwater flow rates and directions at the HASB have remained relatively constant since the basins ceased to be active in 1988.

  20. Computational Aspects of Dam Risk Analysis: Findings and Challenges

    Directory of Open Access Journals (Sweden)

    Ignacio Escuder-Bueno

    2016-09-01

    Full Text Available In recent years, risk analysis techniques have proved to be a useful tool to inform dam safety management. This paper summarizes the outcomes of three themes related to dam risk analysis discussed in the Benchmark Workshops organized by the International Commission on Large Dams Technical Committee on “Computational Aspects of Analysis and Design of Dams.” In the 2011 Benchmark Workshop, estimation of the probability of failure of a gravity dam for the sliding failure mode was discussed. Next, in 2013, the discussion focused on the computational challenges of the estimation of consequences in dam risk analysis. Finally, in 2015, the probability of sliding and overtopping in an embankment was analyzed. These Benchmark Workshops have allowed a complete review of numerical aspects for dam risk analysis, showing that risk analysis methods are a very useful tool to analyze the risk of dam systems, including downstream consequence assessments and the uncertainty of structural models.

  1. On the response of large dams to incoherent seismic excitation

    International Nuclear Information System (INIS)

    Ramadan, O.; Novak, M.

    1993-01-01

    An intensive parametric study was conducted to investigate the response of concrete gravity dams to horizontal, spatially variable seismic ground motions. Both segmented dams consisting of separate blocks, or monoliths, and continuous monolithic dams are considered. The study includes the effects of various parameters on system natural frequencies, vibration modes, modal displacement ratios, as well as dam displacements and internal stresses due to spatially variable ground motions. The dam analytical model, and dam response to incoherent ground motions are described. The results show that the dam vibrates almost as a rigid body under the fully correlated waves, but bends and twists significantly under the spatially correlated motions. Dam-foundation interaction magnifies the low frequency components of the dam response, more so for a full reservoir, but decreases the high frequency components. For long dams, the effects of spatially incoherent ground motions are qualitatively different and can be much greater than those due to surface travelling waves. 3 refs., 3 figs

  2. the effect of age of dam on weaning mass for ftve dam breed types

    African Journals Online (AJOL)

    SUMMARY: The effect of age of dam on adjusted 210 day calf weaning mass was estimated by the Least Squares method for 5 dam types on 2 farms. ... the later maturing breeds would have a low level of productivity because these cows would be eliminated in their potentially prime .... time at 28 (2A) or 3l (28) months old.

  3. Proceeding of the public safety around dams conference

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    The Canadian Dam Association hosted the Public Safety Around Dams workshop in which presentations were given in the morning to describe the different measures and methods implemented by the Ontario Ministry of Natural Resources, Ontario Power Generation and others to improve safety around dams. In the afternoon, the participants toured the Auburn and Lakefield dams and facilities to view the infrastructures and equipment. A roundtable discussion concluded the day. Following this workshop, a Public Safety Around Dams group was created on the social network site, LinkedIn. This conference featured 6 presentations, 3 of which have been catalogued separately for inclusion in this database.

  4. Syria: a waited petroleum production of 600 000 barrels per day for the end of 1993

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    This paper describes the reserves of petroleum deposits and gives statistical data on the production of the main oil fields in Syria. Petroleum production has grown from 160000 barrels per day in 1984 to 515000 barrels per day in 1992 and a production at a level of 600000 barrels per day is waited in 1993. Several petroleum companies, operating in Syria, have contributed to this rise, especially Al-Furat Petroleum Company (AFPC), joint venture between Syrian Petroleum Company (SPC) and Pecten/Shell/Deminex, followed by Deiz Ezzor Petroleum Company (DEZPC), association between the french company Elf Aquitaine and SPC. 2 tabs

  5. IEA countries energy policy. Report 1992

    International Nuclear Information System (INIS)

    1994-01-01

    The International Energy Agency is interested by the energy policy of its 23 members countries. This book sums up the evolution of energy policy in 1991 and 1992, sticking particularly to energy proposal and demand, to energy efficiency, to interaction between energy and environment, to the energy technology and to research and development activities. The 23 countries are examined regularly. The elaborate examinations refer to the energy policy of each member country to dictate the common orientation of their policy. Ministers meetings of IEA take place regularly. The latest took place in PARIS on the fourth of June 1993 where the ministers confirmed that there were essential elements of the energy policy and that they recommended to all countries to take that in account in the formulation of their strategies. Beyond the examinations by country, this book contains a whole report which throws into relief the main new acts which were happened in the IEA members countries and a glimpse on the evolution of the energy situation in the no members countries. It gives specific data and informations on the governmental budgets allocated to research and development energy activities. 6 annexes, 12 graphs., 5 tabs

  6. Major dams of the United States, Geographic NAD83, USGS (2006) [dams00x020_USGS_2006

    Data.gov (United States)

    Louisiana Geographic Information Center — This map layer portrays major dams of the United States, including Puerto Rico and the U.S. Virgin Islands. The map layer was created by extracting dams 50 feet or...

  7. Spatial and temporal patterns of locally-acquired dengue transmission in northern Queensland, Australia, 1993-2012.

    Science.gov (United States)

    Naish, Suchithra; Dale, Pat; Mackenzie, John S; McBride, John; Mengersen, Kerrie; Tong, Shilu

    2014-01-01

    Dengue has been a major public health concern in Australia since it re-emerged in Queensland in 1992-1993. We explored spatio-temporal characteristics of locally-acquired dengue cases in northern tropical Queensland, Australia during the period 1993-2012. Locally-acquired notified cases of dengue were collected for northern tropical Queensland from 1993 to 2012. Descriptive spatial and temporal analyses were conducted using geographic information system tools and geostatistical techniques. 2,398 locally-acquired dengue cases were recorded in northern tropical Queensland during the study period. The areas affected by the dengue cases exhibited spatial and temporal variation over the study period. Notified cases of dengue occurred more frequently in autumn. Mapping of dengue by statistical local areas (census units) reveals the presence of substantial spatio-temporal variation over time and place. Statistically significant differences in dengue incidence rates among males and females (with more cases in females) (χ(2) = 15.17, d.f.  = 1, pQueensland. Tropical areas are potential high-risk areas for mosquito-borne diseases such as dengue. This study demonstrated that the locally-acquired dengue cases have exhibited a spatial and temporal variation over the past twenty years in northern tropical Queensland, Australia. Therefore, this study provides an impetus for further investigation of clusters and risk factors in these high-risk areas.

  8. Geodetic deformation monitoring at Pendidikan Diponegoro Dam

    Science.gov (United States)

    Yuwono, Bambang Darmo; Awaluddin, Moehammad; Yusuf, M. A.; Fadillah, Rizki

    2017-07-01

    Deformation monitoring is one indicator to assess the feasibility of Dam. In order to get the correct result of the deformation, it is necessary to determine appropriate deformation monitoring network and the observation data should be analyse and evaluated carefully. Measurement and analysis of deformation requires relatively accurate data and the precision is high enough, one of the observation method that used is GPS (Global Positioning System). The research was conducted at Pendidikan Undip Dams is Dam which is located in Tembang. Diponegoro Dam was built in 2013 and a volume of 50.86 m3 of water, inundation normal width of up to 13,500 m2. The main purpose of these building is not only for drainage but also for education and micro hydro power plant etc. The main goal of this reasearch was to monitor and analyze the deformation at Pendidikan Undip Dam and to determaine whether GPS measurement could meet accuracy requirement for dam deformation measurements. Measurements were made 2 times over 2 years, 2015 and 2016 using dual frequency GPS receivers with static methods and processed by Scientific Software GAMIT 10.6

  9. Uranium Mill Tailings Remedial Action 1993 Roadmap

    International Nuclear Information System (INIS)

    1993-01-01

    The 1993 Roadmap for the Uranium Mill Tailings Remedial Action (UMTRA) Project office is a tool to assess and resolve issues. The US Department of Energy (DOE) UMTRA Project Office uses the nine-step roadmapping process as a basis for Surface and Groundwater Project planning. This is the second year the Roadmap document has been used to identify key issues and assumptions, develop logic diagrams, and outline milestones. This document is a key element of the DOE planning process. A multi-interest group used the nine-step process to focus on issues, root cause analysis and resolutions. This core group updated and incorporated comments on the basic assumptions, then used these assumptions to identify issues. The list of assumptions was categorized into the following areas: institutional, regulatory compliance, project management, human resource requirements, and other site-specific assumptions. The group identified 10 issues in the analysis phase. All of the issues are ranked according to importance. The number one issue from the 1992 Roadmap, ''Lack of sufficient human resources,'' remained the number one issue in 1993. The issues and their ranking are as follows: Lack of sufficient human resources; increasing regulatory requirements; unresolved groundwater issues; extension of UMTRCA through September 30, 1998; lack of post-UMTRA and post-cell closure policies; unpredictable amounts and timing of Federal funding; lack of regulatory compliance agreements; problem with states providing their share of remedial action costs; different interests and priorities among participants; and technology development/transfer. The issues are outlined and analyzed in detail in Section 8.0, with a schedule for resolution of these issues in Section 9.0

  10. Investigating leaks in dams and reservoirs

    International Nuclear Information System (INIS)

    2003-01-01

    Millions of people throughout the world depend on dams and reservoirs for electricity, water and flood protection. Dams require significant investment to build and maintain, and yet their usefulness and integrity are constantly threatened by leakage and sedimentation. Isotope hydrology techniques, combined with conventional analytical methods, are a cost-effective tool to reduce such threats. The International Atomic Energy Agency is promoting their use to protect these investments and improve management, particularly by supporting specialized teams of scientists and engineers to investigate dam leakage in African countries on request. (IAEA)

  11. A study on the effect of a broken large sabo dam on the sediment transportation in channel - an example of Baling-sabo-dam

    Science.gov (United States)

    Tseng, W. H.; Shieh, C. L.; Lee, S. P.; Tsang, Y. C.

    2009-04-01

    To retard the sediment transportation and its effect on the reservoir, large sabo dams are built in the main channel of the reservoir watershed in Taiwan. Therefore, these large sabo dams affect upstream, downstream, and the reservoir significantly if the dam breaks. There was about 450 mm of rain fell in the reservoir watershed during typhoon Wipha that struck Taiwan on 17-19, September, 2007. This heavy rainfall caused the Baling-sabo-dam broken about 60 m of the upper Dahan Creek in the Shimen Reservoir watershed. The dam, built in 1977, is 38 m in height, 80 m in width, and is designed to reserve sediment materials about 10 million m3. The upper river bed was diminished maximum to 20 m in a month; the deposited and affected areas are unable to estimate and still required to be observed. The main purpose of this paper is to analyze the topographic characteristic of the channel after the dam broke according to the topographic and surveyed data before and after the dam broke. The longitudinal profile and the cross section data show the effects to the channel after the dam break and the channel is able to classify in several sections. A simple comparison of the sediment discharge estimated from the hydrologic data with the topographic survey data is also analyzed. Keywords:dam break, sabo dam, sediment discharge

  12. The Grand Ethiopian Renaissance Dam and Ethiopia's Succession ...

    African Journals Online (AJOL)

    Tadesse Kassa Woldetsadik

    2013-06-01

    Jun 1, 2013 ... Dam concessions engendered detrimental impacts on Ethiopia's riparian rights ... control works on the Aswan High and the Roseires dams. Disturbed by the ... hegemonic control that would inevitably ensue from construction of the Dam ...... Projects Implementation Division AAAID, Sudan, p.1. 39 Ibid.

  13. Dam failure analysis/calibration using NWS models on dam failure in Alton, New Hampshire

    International Nuclear Information System (INIS)

    Capone, E.J.

    1998-01-01

    The State of New Hampshire Water Resources Board, the United States Geological Service, and private concerns have compiled data on the cause of a catastrophic failure of the Bergeron Dam in Alton, New Hampshire in March of 1996. Data collected related to the cause of the breach, the breach parameters, the soil characteristics of the failed section, and the limits of downstream flooding. Dam break modeling software was used to calibrate and verify the simulated flood-wave caused by the Bergeron Dam breach. Several scenarios were modeled, using different degrees of detail concerning the topography/channel-geometry of the affected areas. A sensitivity analysis of the important output parameters was completed. The relative importance of model parameters on the results was assessed against the background of observed historical events

  14. STABILITAS CHECK DAM DI ARBORETUM DESA SUMBER BRANTAS

    Directory of Open Access Journals (Sweden)

    Endang Purwati

    2012-09-01

    Full Text Available Abstract: The stability of check-dam in arboretum of Sumber Brantas village. Sumber Brantas water sources area is arboretum territory which has to be maintained as conservation either for technical or vegetation (plants cover by sustainable development. Arboretum territory is made as asylum in irrigation system district of Brantas River. This research discusses technical conservation activity to build the check dam in conserving the area. Check dam is built dimensionally by using HEC-RAS Program to get safe and stable dimension for rolling, shifting and piping of Sf > 1.5, and based on hydrologic analysis to get maximum flood discharge of 48.01 m3second-1. Hydraulic analysis is used to get water level profile and pressure for the dam body. Stability of the structure will be controlled by construction load (weight of check dam and its fully sediment storage condition. The result of this research shows that the safe and stable dimension for check dam are as follows: 28 meter of width; 3 meter of main height; 1.5 meter of sub-height; 10 meter of stilling basin length (Main Dam–Sub Dam.

  15. The blind men meet the elephant at the dam: Alternative spatial and taxonomic components reveal different insights about how low-head dams impact fish biodiversity

    Science.gov (United States)

    Fencl, Jane S.; Mather, Martha E.; Smith, Joseph M.; Hitchman, Sean M.

    2017-01-01

    Dams are ubiquitous environmental impacts that threaten aquatic ecosystems. The ability to compare across research studies is essential to conserve the native biodiversity that is impacted by the millions of low‐head dams that currently fragment streams and rivers. Here, we identify a previously unaddressed obstacle that impedes this generalization. Specifically, divergent spatial and taxonomic approaches that result from different conceptualizations of the dam‐biodiversity problem can produce conflicting science‐based conclusions about the same dam impact. In this research, using the same dammed and undammed sites, we evaluated the scientific generality of different conceptualizations of the dam‐biodiversity problem. We compared two different but commonly used spatial approaches—(1) above dam–below dam vs. (2) undammed–dammed comparisons—and 11 different, commonly used taxonomic approaches (three assemblage summaries, eight guilds). Sites above the dam structure had less diverse fish assemblages than sites below dams, whereas sites below the dam structure were similar to undammed sites. Thus, spatial approach 1 detected a large dam effect and spatial approach 2 detected a small dam effect. Similarly, some taxonomic responses (species richness, diversity, abundance, and number of guilds) detected large dam effects; other responses detected small (riffle specialist guild) or no dam effects (pool generalists). In summary, our results showed that how the problem was framed altered scientific conclusions and created different dam realities. The metaphor of how individual blind men disagree about the structure of an elephant, based on examinations of different body parts, reinforces the need for a coordinated, holistic perspective on dam research. Although no single approach is adequate for all problems, identifying the form, consequences of, and relationships among different research conceptualizations will set the stage for future syntheses of dam

  16. Forest pest conditions in the maritimes in 1992. Information report No. M-X-183E. Annual publication

    Energy Technology Data Exchange (ETDEWEB)

    Magasi, L.P.; Cormier, J.R.

    1993-01-01

    Review of the status of forest insects and diseases in the Maritimes Region in 1992, along with forecast conditions for 1993 when appropriate. Describes pests and problems of conifers, hardwoods, and high value areas such as nurseries, seed orchards, plantations, and Christmas tree areas and summarizes control operations against spruce budworm and Sirococcus shoot blight. A chapter on forest health monitoring brings together the various aspects of work dealing with changes in forest conditions. Forest insect monitoring systems, such as pheromones and light traps, are briefly described. A list of reports and publications relating to forest pest conditions is included.

  17. Conference Proceedings of International High Speed Networks for Scientific and Technical Information, Held at Ottawa, Canada on 6-7 October 1993 (Les Reseaux Internationaux Rapides D’Echange D’Information Scientifique et Technique)

    Science.gov (United States)

    1994-02-01

    reseau systtme pour que toutes les commandes soient girkes local Ethernet. dlectroniquement. Trois micro -ordinateurs permettent Ia transmission des...May 1993, ISBN 0.88736-936-7. Networking and the future of the Libraries, April 2-5, 1992. Paper 17. [71 Goodman, D., "El servicio de Directorio de

  18. Seismic response of uplifting concrete gravity dams

    International Nuclear Information System (INIS)

    Leger, P.; Sauve, G.; Bhattacharjee, S.

    1992-01-01

    The foundation interaction effects on the seismic response of dam-foundation systems have generally been studied using the linear elastic finite element models. In reality, the foundation can not develop effective tensile stresses to a significant degree along the interface. A two-dimensional finite element model, in which nonlinear gap elements are used at the dam-foundation interface to determine the uplift response of concrete gravity dams subjected to seismic loads, is presented. Time domain analyses were performed for a wide range of modelling assumptions such as dam height, interface uplift pressure, interface mesh density, and earthquake input motions, that were systematically varied to find their influence on the seismic response. The nonlinear interface behavior generally reduces the seismic response of dam-foundation systems acting as a seismic isolation mechanism, and may increase the safety against sliding by reducing the base shear transmitted to the foundation. 4 refs., 5 figs., 6 tabs

  19. Recent changes in Imja Glacial Lake and its damming moraine in the Nepal Himalaya revealed by in situ surveys and multi-temporal ASTER imagery

    International Nuclear Information System (INIS)

    Fujita, Koji; Sakai, Akiko; Nuimura, Takayuki; Yamaguchi, Satoru; Sharma, Rishi R

    2009-01-01

    Changes in the area and bathymetry of Imja Glacial Lake and in the elevation of its damming moraine, Khumbu region, Nepal Himalaya are investigated. Previously reported changes in the lake area have been updated by multi-temporal ASTER images, which revealed a decreased expansion rate after 2000. A provisional expansion of the lake observed in 2004, from which some studies concluded an accelerated lake expansion due to global warming, has, from 2005, subsided to the glacier surface. Bathymetric changes for the period 1992-2002 that were first obtained for Himalayan glacial lakes suggest that the melting of debris-covered ice beneath the lake is insignificant in terms of the increase in lake volume, and that the retreat of a glacier in contact with the lake by calving is essential for the lake's expansion. Changes in the height of a damming moraine for the period 2001-2007 suggest a continuous surface lowering near the lake, though the lowering rates are smaller than those for the period 1989-1994.

  20. Legislative developments in radioactive materials transportation, April 1993--August 1993

    International Nuclear Information System (INIS)

    Reed, J.B.; Cummins, J.

    1993-09-01

    This is the seventh report prepared by the National Conference of State Legislatures (NCSL) on developments in radioactive materials transportation. It updates information contained in the April 1993 report on Legislative Developments in Radioactive Materials Transportation and describes activities for the period April 1, 1993--August 31, 1993. NCSL currently is updating an on-line data base that contains abstracts of federal, state and local laws and regulations relating to the transportation of radioactive materials. The data base will be operated by NCSL under a cooperative agreement with the Department of Energy's (DOE) Office of Civilian Radioactive Waste Management. Limited availability of on-line capability is anticipated by the end of 1993. Users approved by DOE and NCSL will have access to the data base. A copy of any legislation listed in this report can be obtained by contacting the people listed below. This report contains the current status of legislation introduced in the 1993 state legislative sessions, not previously reviewed in past reports. Bills that address nuclear materials transportation and the broader area of hazardous materials transportation are grouped by state according to their status--enacted, pending or failed. In addition, bills that deal with emergency preparedness are described. (General nuclear waste legislation with no transportation element is no longer tracked.) Also included are Federal Register notices pertinent to radioactive waste and hazardous materials transportation

  1. Seismic performance assessment of latyan concrete buttress dam ...

    African Journals Online (AJOL)

    In order to design earthquake resistant dams and evaluate the safety of existing dams that will be exposed to future earthquakes, it is essential to have accurate and reliable analysis procedures to predict the stresses and deformations in dams subjected to earthquake ground motion. For a damwater- foundation system, the ...

  2. Walden North Dam overtopping : emergency response and rehabilitation

    Energy Technology Data Exchange (ETDEWEB)

    Dyer, S. [FortisBC Inc., South Slocan, BC (Canada); McCreanor, J. [Acres International Ltd., Calgary, AB (Canada); Cronin, D.L.R.; Daw, D. [Acres International Ltd., Vancouver, BC (Canada)

    2004-09-01

    This paper described the events that led to the overtopping of the Walden North Dam during a heavy rainfall in June 2002, resulting in a breach around an abutment wall. The dam is part of a run-of-river hydro development on Cayoosh Creek near Lillooet, British Columbia. The Walden North Dam was a low, 46 meter wide concrete dam with a single radial gate. The dam overtopping was attributed to failure of the radial gate hoist. Prior to this event, the dam had been classified by the British Columbia Dam Safety Authorities as a high and then a low consequence category of failure. As facility managers, Aquila Networks Canada Ltd. established an immediate action plan to stabilize the situation and resume normal power production by applying the following priorities: (1) ensure safety of workers and the public, (2) limit further damage to the dam and other facilities, (3) ensure environmental protection, and (4) continue to operate the generation units. Local authorities were informed to evacuate a downstream campsite and environmental agencies were contacted along with safety regulators. Repairs included demolition of the damaged portion of the structure and construction a new two-bay gate/stoplog spillway and bridge. Construction was completed by September 2003 according to the requirements of the Department of Fisheries and Oceans for minimum flow, accurate control of fish flows and environmental monitoring of the stream area. 10 figs.

  3. Developing an integrated dam safety program

    International Nuclear Information System (INIS)

    Nielsen, N. M.; Lampa, J.

    1996-01-01

    An effort has been made to demonstrate that dam safety is an integral part of asset management which, when properly done, ensures that all objectives relating to safety and compliance, profitability, stakeholders' expectations and customer satisfaction, are achieved. The means to achieving this integration of the dam safety program and the level of effort required for each core function have been identified using the risk management approach to pinpoint vulnerabilities, and subsequently to focus priorities. The process is considered appropriate for any combination of numbers, sizes and uses of dams, and is designed to prevent exposure to unacceptable risks. 5 refs., 1 tab

  4. Community radiation monitoring program. Annual report, October 1, 1992--September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Cooper, E.N.

    1994-08-01

    The Community Radiation Monitoring Program (CRMP) is a cooperative effort between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), the Desert Research Institute (DRI), a division of the University and Community College System of Nevada, and the Nuclear Engineering Laboratory of the University of Utah (UUNEL). The thirteenth year of this program began in the fall of 1992, and the work continues as an integral part of the DOE--sponsored long-term offsite radiological monitoring effort that has been conducted by EPA and its predecessors since the inception of nuclear testing at the Nevada Test Site (NTS). The CRMP began by enhancing and centralizing environmental monitoring and sampling equipment at 15 communities in the then-existing EPA monitoring network around the NTS, and has since expanded to 19 locations in Nevada, Utah, and California. The primary objectives of this program are still to increase the understanding by the people who live in the area surrounding the NTS of the activities for which DOE is responsible, to enhance the performance of radiological sampling and monitoring, and to inform all concerned of the results of these efforts. One of the primary methods used to improve the communication link with the people in the potentially impacted area has been the hiring and training of local citizens as Station Managers and program representatives in those selected communities in the offsite area. These mangers, active science teachers wherever possible, have succeeded through their training, experience, community standing, and effort in becoming a very visible, able, and valuable asset in this link.

  5. Community radiation monitoring program. Annual report, October 1, 1992--September 30, 1993

    International Nuclear Information System (INIS)

    Cooper, E.N.

    1994-08-01

    The Community Radiation Monitoring Program (CRMP) is a cooperative effort between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), the Desert Research Institute (DRI), a division of the University and Community College System of Nevada, and the Nuclear Engineering Laboratory of the University of Utah (UUNEL). The thirteenth year of this program began in the fall of 1992, and the work continues as an integral part of the DOE--sponsored long-term offsite radiological monitoring effort that has been conducted by EPA and its predecessors since the inception of nuclear testing at the Nevada Test Site (NTS). The CRMP began by enhancing and centralizing environmental monitoring and sampling equipment at 15 communities in the then-existing EPA monitoring network around the NTS, and has since expanded to 19 locations in Nevada, Utah, and California. The primary objectives of this program are still to increase the understanding by the people who live in the area surrounding the NTS of the activities for which DOE is responsible, to enhance the performance of radiological sampling and monitoring, and to inform all concerned of the results of these efforts. One of the primary methods used to improve the communication link with the people in the potentially impacted area has been the hiring and training of local citizens as Station Managers and program representatives in those selected communities in the offsite area. These mangers, active science teachers wherever possible, have succeeded through their training, experience, community standing, and effort in becoming a very visible, able, and valuable asset in this link

  6. Development of a System-Wide Predator Control Program: Stepwise Implementation of a Predation Index, Predator Control Fisheries, and Evaluation Plan in the Columbia River Basin; Northern Pikeminnow Management Program, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Porter, Russell G.; Glaser, Bryce G.; Amren, Jennifer

    2003-03-01

    This report presents results for year ten in a basin-wide program to harvest northern pikeminnow (Ptychocheilus oregonensis). This program was started in an effort to reduce predation by northern pikeminnow on juvenile salmonids during their emigration from natal streams to the ocean. Earlier work in the Columbia River Basin suggested predation by northern pikeminnow on juvenile salmonids might account for most of the 10-20% mortality juvenile salmonids experience in each of eight Columbia River and Snake River reservoirs. Modeling simulations based on work in John Day Reservoir from 1982 through 1988 indicated that, if predator-size northern pikeminnow were exploited at a 10-20% rate, the resulting restructuring of their population could reduce their predation on juvenile salmonids by 50%. To test this hypothesis, we implemented a sport-reward angling fishery and a commercial longline fishery in the John Day Pool in 1990. We also conducted an angling fishery in areas inaccessible to the public at four dams on the mainstem Columbia River and at Ice Harbor Dam on the Snake River. Based on the success of these limited efforts, we implemented three test fisheries on a system-wide scale in 1991--a tribal longline fishery above Bonneville Dam, a sport-reward fishery, and a dam-angling fishery. Low catch of target fish and high cost of implementation resulted in discontinuation of the tribal longline fishery. However, the sport-reward and dam-angling fisheries were continued in 1992 and 1993. In 1992, we investigated the feasibility of implementing a commercial longline fishery in the Columbia River below Bonneville Dam and found that implementation of this fishery was also infeasible. Estimates of combined annual exploitation rates resulting from the sport-reward and damangling fisheries remained at the low end of our target range of 10-20%. This suggested the need for additional effective harvest techniques. During 1991 and 1992, we developed and tested a modified

  7. Annual report 1992 of the Tandem Accelerator Center, University of Tsukuba

    International Nuclear Information System (INIS)

    1993-10-01

    This annual report includes the research activities and the technical developments carried out at the Tandem Accelerator Center in University of Tsukuba for the period from April 1992 to March 1993. New experimental investigations were made on (1) nuclear spectroscopy was initiated by a new γ ray spectrometer; (2) polarization phenomena in nuclear reactions; (3) the application of energetic heavy ions to solid state physics; (4) the behavior of self interstitial atoms and its migration mechanism in Mo metal (5) the studies on electronic conduction of metal oxides and bronzes by NMR; (6) Moessbauer studies on Fe-Cr alloy and the RBS analysis of YBCO superconductor films; and (7) a new field was challenged on the micro cluster physics. Nuclear collective motion and the relativistic mean-field theory is also included in this report. (J.P.N.)

  8. Thermal monitoring of leakage through Karkheh embankment dam, Iran

    Energy Technology Data Exchange (ETDEWEB)

    Mirghasemi, A.A.; Bagheri, S.M. [Tehran Univ., Tehran (Iran, Islamic Republic of). Dept. of Civil Engineering; Heidarzadeh, M. [Tehran Univ., Tehran (Iran, Islamic Republic of). Dept. of Civil Engineering]|[Mahab Ghodss Consulting Engineers, Tehran (Iran, Islamic Republic of)

    2007-07-01

    A newly developed and simple method for monitoring seepage in embankment dams was presented. The method of temperature measurement is based on the fact that a change in permeability results in a change in seepage flow, thereby causing a temperature change that can be readily measured in the dam body and foundation. In this study, water leaking through the Karkheh embankment dam was thermally analyzed to determine a pattern and amount of water seepage. With nearly 33 million cubic metres of fill, the Karkheh earth and rock-fill dam is the largest dam in Iran. Construction was completed in 2000. The thermal processes in the embankment were studied due to the dam's complex thermo-hydraulic behaviour. Thermal data was collected and analyzed during construction and operation of the dam. This paper presented the temperature variations for the different dam zones, including core, upstream shell, downstream shell, upstream filter, downstream filter and the plastic concrete cut-off wall. It was determined that the clay core works very well as an impermeable curtain. It was also shown that temperature variations of the Karkheh reservoir water is seasonal, and decrease as water depth increases. The reservoir water temperature remains constant beyond depths of 60 metres. The thermal behaviour of the core is not similar to that of the reservoir, indicating a very low value of seepage through the core. The pattern of temperature variations in the upstream shell in the left abutment is harmonic, while in the right abutment it is not harmonic. A harmonic pattern of temperature variation exists in some aquifers of the dam foundation, indicating high seepage through these aquifers. The Karkheh dam cut-off wall performs satisfactorily. It was determined that one dimensional equations for estimating seepage cannot be applied for the Karkheh dam. 17 refs., 11 figs.

  9. Grouting Applications in Cindere Dam

    Directory of Open Access Journals (Sweden)

    Devrim ALKAYA

    2011-01-01

    Full Text Available Grouting is one of the most popular method to control the water leakage in fill dam constructions. With this regard this method is widely used in all the world. Geological and geotechnical properties of rock are important parameters affect the design of grouting. In this study, geotechnical properties of Cindere Dam's base rock and the grouting prosedure have been investigated with grouting pressure.

  10. Total System Performance Assessment, 1993: An evaluation of the potential Yucca Mountain repository, B00000000-01717-2200-00099, Rev. 01

    International Nuclear Information System (INIS)

    Andrews, R.W.; Dale, T.F.; McNeish, J.A.

    1994-03-01

    Total System Performance Assessments are an important component in the evaluation of the suitability of Yucca Mountain, Nevada as a potential site for a mined geologic repository for the permanent disposal of high-level radioactive wastes in the United States. The Total System Performance Assessments are conducted iteratively during the site characterization to identify issues which should be addressed by the characterization and design activities as well as providing input to regulatory/licensing and programmatic decisions. During fiscal years 1991 and 1992, the first iteration of Total System Performance Assessment (hereafter referred to as TSPA 1991) was completed by Sandia National Laboratories and Pacific Northwest Laboratory. Beginning in fiscal year 1993, the Civilian Radioactive Waste Management System Management and Operating Contractor was assigned the responsibility to plan, coordinate, and contribute to the second iteration of Total System Performance Assessment (hereafter referred to as TSPA 1993). This document presents the objectives, approach, assumptions, input, results, conclusions, and recommendations associated with the Management and Operating Contractor contribution to TSPA 1993. A parallel effort was conducted by Sandia National Laboratories and is reported in Wilson et al. (1994, in press)

  11. Sinkhole investigated at B.C. Hydro's Bennett Dam

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    The cause of a sinkhole which appeared in a roadway crossing an earth filled dam in B. C., was discussed. The hole measured 6 ft. across and 20 ft. deep, and occurred in B.C. Hydro's W.A.C. Bennett Dam which measures 600 ft. high, 2,600 ft. wide at the base and 35 ft. wide at the crest. The cause of the sinkhole is not known, but it is believed that a weakness in the dam may have found its way to the surface via a pipe connected to a bedrock settlement gauge buried within the dam. Sonar and ground penetrating radar were used to examine the area. The hole has been filled with gravel and monitoring continues. Experts do not anticipate immediate risk of dam failure. 1 fig

  12. Plugs or flood-makers? the unstable landslide dams of eastern Oregon

    Science.gov (United States)

    Safran, Elizabeth B.; O'Connor, Jim E.; Ely, Lisa L.; House, P. Kyle; Grant, Gordon E.; Harrity, Kelsey; Croall, Kelsey; Jones, Emily

    2015-01-01

    Landslides into valley bottoms can affect longitudinal profiles of rivers, thereby influencing landscape evolution through base-level changes. Large landslides can hinder river incision by temporarily damming rivers, but catastrophic failure of landslide dams may generate large floods that could promote incision. Dam stability therefore strongly modulates the effects of landslide dams and might be expected to vary among geologic settings. Here, we investigate the morphometry, stability, and effects on adjacent channel profiles of 17 former and current landslide dams in eastern Oregon. Data on landslide dam dimensions, former impoundment size, and longitudinal profile form were obtained from digital elevation data constrained by field observations and aerial imagery; while evidence for catastrophic dam breaching was assessed in the field. The dry, primarily extensional terrain of low-gradient volcanic tablelands and basins contrasts with the tectonically active, mountainous landscapes more commonly associated with large landslides. All but one of the eastern Oregon landslide dams are ancient (likely of order 103 to 104 years old), and all but one has been breached. The portions of the Oregon landslide dams blocking channels are small relative to the area of their source landslide complexes (0.4–33.6 km2). The multipronged landslides in eastern Oregon produce marginally smaller volume dams but affect much larger channels and impound more water than do landslide dams in mountainous settings. As a result, at least 14 of the 17 (82%) large landslide dams in our study area appear to have failed cataclysmically, producing large downstream floods now marked by boulder outwash, compared to a 40–70% failure rate for landslide dams in steep mountain environments. Morphometric indices of landslide dam stability calibrated in other environments were applied to the Oregon dams. Threshold values of the Blockage and Dimensionless Blockage Indices calibrated to worldwide

  13. Spatial and Temporal Patterns of Locally-Acquired Dengue Transmission in Northern Queensland, Australia, 1993–2012

    Science.gov (United States)

    Naish, Suchithra; Dale, Pat; Mackenzie, John S.; McBride, John; Mengersen, Kerrie; Tong, Shilu

    2014-01-01

    Background Dengue has been a major public health concern in Australia since it re-emerged in Queensland in 19921993. We explored spatio-temporal characteristics of locally-acquired dengue cases in northern tropical Queensland, Australia during the period 1993–2012. Methods Locally-acquired notified cases of dengue were collected for northern tropical Queensland from 1993 to 2012. Descriptive spatial and temporal analyses were conducted using geographic information system tools and geostatistical techniques. Results 2,398 locally-acquired dengue cases were recorded in northern tropical Queensland during the study period. The areas affected by the dengue cases exhibited spatial and temporal variation over the study period. Notified cases of dengue occurred more frequently in autumn. Mapping of dengue by statistical local areas (census units) reveals the presence of substantial spatio-temporal variation over time and place. Statistically significant differences in dengue incidence rates among males and females (with more cases in females) (χ2 = 15.17, d.f. = 1, pQueensland. Conclusions Tropical areas are potential high-risk areas for mosquito-borne diseases such as dengue. This study demonstrated that the locally-acquired dengue cases have exhibited a spatial and temporal variation over the past twenty years in northern tropical Queensland, Australia. Therefore, this study provides an impetus for further investigation of clusters and risk factors in these high-risk areas. PMID:24691549

  14. The geomorphic legacy of small dams — An Austrian study

    NARCIS (Netherlands)

    Poeppl, R.E.; Keesstra, S.D.; Hein, T.

    2015-01-01

    Dams represent one of the most dominant forms of human impact upon fluvial systems during the Anthropocene, as they disrupt the downstream transfer of water and sediments. Removing dams restores river continuity and channel morphology. Both dam construction and dam removal induce geomorphic channel

  15. Metals and Ceramics Division progress report for period ending December 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Craig, D.F.; Bradley, R.A.; Weir, J.R. Jr.

    1994-07-01

    This report provides an overview of activities and accomplishsments of the division from October 1992 through December 1993; the division is organized to provide technical support, mainly in the area of high-temperature materials, for technologies being developed by DOE. Activities span the range from basic research to industrial interactions (cooperative research and technology transfer). Sections 1-5 describe the different functional groups (engineering materials, high-temperature materials, materials science, ceramics, nuclear fuel materials). Sect. 6 provides an alternative view of the division in terms of the major programs, most of which cross group lines. Sect. 7 summarizes external interactions including cooperative R and D programs and technology transfer functions. Finally, Sect. 8 briefly describes the division`s involvement in educational activities. Several organizational changes were effected during this period.

  16. Estimating flood inundation caused by dam failures

    Energy Technology Data Exchange (ETDEWEB)

    Mocan, N. [Crozier and Associates Inc., Collingwood, ON (Canada); Joy, D.M. [Guelph Univ., ON (Canada). School of Engineering; Rungis, G. [Grand River Conservation Authority, Cambridge, ON (Canada)

    2006-01-15

    Recent advancements in modelling inundation due to dam failures have allowed easier and more illustrative analyses of potential outcomes. This paper described new model and mapping capabilities available using the HEC-RAS hydraulic model in concert with geographic information systems (GIS). The study area was the upper reaches of Canagagigue Creek and the Woolwich Dam near Elmira, Ontario. A hydraulic analysis of a hypothetical dam failure was developed based on the summer probable maximum flood (PMF) event. Limits extended from Woolwich Dam to downstream of the Town of Elmira. An incoming summer PMF hydrograph was set as the upstream boundary condition in the upstream model. Simulation parameters include simulation time-step; implicit weighting factor; water surface calculation tolerance; and output calculation interval. Peak flows were presented, as well as corresponding flood inundation results through the Town of Elmira. The hydraulic model results were exported to a GIS in order to develop inundation maps for emergency management planning. Results from post-processing included inundation maps for each of the simulated time-steps as well as an inundation animation for the duration of the dam breach. It was concluded that the modelling tools presented in the study can be applied to other dam safety assessment projects in order to develop effective and efficient emergency preparedness plans through public consultation and the establishment of impact zones. 1 tab., 2 figs.

  17. F-Area Seepage Basins groundwater monitoring report -- third and fourth quarters 1993

    International Nuclear Information System (INIS)

    Butler, C.T.

    1994-03-01

    During the second half of 1993, the groundwater at the F-Area Seepage Basins (FASB) was monitored in compliance with Module 3, Section C, of South Carolina Hazardous Waste Permit SC1-890-008-989, effective November 2, 1992. The monitoring well network is composed of 87 FSB wells screened in the three hydrostratigraphic units that make up the uppermost aquifer beneath the FASB. A detailed description of the uppermost aquifer is included in the Resource Conservation and Recovery Act Part B post-closure care permit application for the F-Area Hazardous Waste Management Facility submitted to the South Carolina Department of Health and Environmental Control (SCDHEC) in December 1990. Beginning in the first quarter of 1993, the standard for comparison became the SCDHEC Groundwater Protection Standard (GWPS) specified in the approved F-Area Seepage Basins Part B permit. Currently and historically, gross alpha, nitrate, nonvolatile beta, and tritium are among the primary constituents to exceed standards. Numerous other radionuclides and hazardous constituents also exceeded the GWPS in the groundwater at the FASB during the second half of 1993, notably aluminum, iodine-129, and zinc. The elevated constituents are found primarily in Aquifer Zone 2B 2 and Aquifer Zone 2B 1 wells. However, several Aquifer Unit 2A wells also contain elevated levels of constituents. Isoconcentration/isoactivity maps included in this report indicate both the concentration/activity and extent of the primary contaminants in each of the three hydrostratigraphic units. Water-level maps indicate that the groundwater flow rates and directions at the FASB have remained relatively constant since the basins ceased to be active in 1988

  18. Dynamic analyzing procedures adopted for concrete-faced rockfill dams in Turkey

    Energy Technology Data Exchange (ETDEWEB)

    Tosun, H. [Dam Safety Association, Ankara (Turkey); Tosun, K. [TVT Hydrotech Bureau, Ankara (Turkey)

    2008-07-01

    A concrete faced rockfill dam (CFRD) has some advantages compared to other embankment types. The advantages include minimal settlement problems through the use of compacted rockfill; increased overall stability of the dam since the water pressure acts on the upstream face; and pore water pressure does not develop in the rockfill zone if it is well designed and constructed. It is thought that well-compacted CFRD has a high resistance to earthquake loading, as based on several factors including acceptable past performance of similar dams. While numerical solutions performed for this type of dams indicate that it is as safe as other embankment dams, their behavior is still questionable when they are subjected to severe seismic loading. This paper outlined the key principals of the dynamic analyzing method adopted for CFRDs in Turkey and summarized the practice of CFRDs with heights ranging from 54 to 135 metres throughout the country. Two-dimensional finite element models were executed to estimate displacements on the crest under the different loadings of earthquake. Dams that were discussed included the Kurtun Dam, the Torul Dam, the Atasu Dam, the Dim Dam, the Gordes Dam, and the Marmaris Dam. The paper also discussed the limitation about permanent settlement provided in the national dam specification and introduced the results obtained from a case study of the Pamukluk Dam located in southern Turkey. Geology and geotechnics as well as the embankment details and materials were discussed. The case study also summarized the selection of seismic parameters and dynamic analyses. 35 refs., 1 tab., 8 figs.

  19. Loss of an iridium-192 source and therapy misadministration at Indiana Regional Cancer Center, Indiana, Pennsylvania, on November 16, 1992

    International Nuclear Information System (INIS)

    1993-02-01

    On December 1, 1992, the Indiana Regional Cancer Center reported to the US Nuclear Regulatory Commission's (NRC) Region I that they believed a 1.37 E + 11 becquerel (3.7-curie) iridium-192 source from their Omnitron 2000 high dose rate remote brachytherapy afterloader had been found at a biohazard waste transfer station in Carnegie, Pennsylvania. After notifying the NRC, this cancer center, one of several operated by the licensee, Oncology Services Corporation, retrieved the source, and Region I dispatched an inspector and a supervisor to investigate the event. The source was first detected when it triggered radiation alarms at a waste incinerator facility in. Warren, Ohio. The licensee informed the NRC that the source wire had apparently broken during treatment of a patient on November 16, 1992, leaving the source in the patient. On the basis of the seriousness of the incident, the NRC elevated its response to an Incident Investigation. The Incident Investigation Team initiated its investigation on December 3, 1992. The investigation team concluded that the patient received a serious misadministration and died on November 21, 1992, and that over 90 individuals were exposed to radiation from November 16 to December 1, 1992. In a press release dated January 26, 1993, the Indiana County Coroner stated that the cause of death listed in the official autopsy report was ''Acute Radiational Exposure and Consequences Thereof'' An almost identical source wire failure occurred with an afterloader in Pittsburgh, Pennsylvania, on December 7, 1992, but with minimal radiological consequences. This incident was included in the investigation. This report discusses the Omnitron 2000 high dose rate afterloader source-wire failure, the reasons why the failure was not detected by Indiana Regional Cancer Center, the potential consequences to the patient, the estimated radiological doses to workers and the public, and regulatory aspects associated with this incident

  20. Hydrogeophysical investigations at Hidden Dam, Raymond, California

    Science.gov (United States)

    Minsley, Burke J.; Burton, Bethany L.; Ikard, Scott; Powers, Michael H.

    2011-01-01

    Self-potential and direct current resistivity surveys are carried out at the Hidden Dam site in Raymond, California to assess present-day seepage patterns and better understand the hydrogeologic mechanisms that likely influence seepage. Numerical modeling is utilized in conjunction with the geophysical measurements to predict variably-saturated flow through typical two-dimensional dam cross-sections as a function of reservoir elevation. Several different flow scenarios are investigated based on the known hydrogeology, as well as information about typical subsurface structures gained from the resistivity survey. The flow models are also used to simulate the bulk electrical resistivity in the subsurface under varying saturation conditions, as well as the self-potential response using petrophysical relationships and electrokinetic coupling equations.The self-potential survey consists of 512 measurements on the downstream area of the dam, and corroborates known seepage areas on the northwest side of the dam. Two direct-current resistivity profiles, each approximately 2,500 ft (762 m) long, indicate a broad sediment channel under the northwest side of the dam, which may be a significant seepage pathway through the foundation. A focusing of seepage in low-topography areas downstream of the dam is confirmed from the numerical flow simulations, which is also consistent with past observations. Little evidence of seepage is identified from the self-potential data on the southeast side of the dam, also consistent with historical records, though one possible area of focused seepage is identified near the outlet works. Integration of the geophysical surveys, numerical modeling, and observation well data provides a framework for better understanding seepage at the site through a combined hydrogeophysical approach.

  1. Seepage problem in Papan dam and the treatment

    Energy Technology Data Exchange (ETDEWEB)

    Sharghi, A. [JTMA Co., Tehran (Iran, Islamic Republic of); Palassi, M. [Tehran Univ. (Iran, Islamic Republic of). Dept. of Civil Engineering

    2003-07-01

    The Papan dam in the Krygyz Republic is 97 metres high. It is located in the Osh Oblast, within a narrow and steep sided gorge on the Ak-Bura River, approximately 20 kilometres south of the City of Osh. The impoundment of the dam revealed large inflows of water to the downstream dam through the upper half of the dam and through the joints in the right abutment. A number of options were considered before a treatment method was selected. The causes of the leakage were poor grouting, and joints and fissures in the abutment. The remedial process involved the use of a plastic concrete cutoff wall extended from the crest of the dam to a depth of approximately 70 metres, in addition to the use of a grouting curtain in the right abutment. 2 figs.

  2. Uranium purchases report 1992

    International Nuclear Information System (INIS)

    1993-01-01

    Data reported by domestic nuclear utility companies in their responses to the 1991 and 1992 ''Uranium Industry Annual Survey,'' Form EIA-858, Schedule B ''Uranium Marketing Activities,are provided in response to the requirements in the Energy Policy Act 1992. Data on utility uranium purchases and imports are shown on Table 1. Utility enrichment feed deliveries and secondary market acquisitions of uranium equivalent of US DOE separative work units are shown on Table 2. Appendix A contains a listing of firms that sold uranium to US utilities during 1992 under new domestic purchase contracts. Appendix B contains a similar listing of firms that sold uranium to US utilities during 1992 under new import purchase contracts. Appendix C contains an explanation of Form EIA-858 survey methodologies with emphasis on the processing of Schedule B data

  3. Design and Construction of Dams, Reservoirs, and Balancing Lakes

    International Nuclear Information System (INIS)

    Lemperiere, F.

    2003-01-01

    The general data presented in sections two and three gives an idea of the extreme diversity of the millions of very large or very small dams worldwide. Dam design and construction methods for the most usual types of large dams are presented and justified in section four. The possibility and usefulness of building as many dams in the 21. century as have been built in the 20. is analyzed in section six. (author)

  4. Estimates o the risks associated with dam failure

    Energy Technology Data Exchange (ETDEWEB)

    Ayyaswamy, P.; Hauss, B.; Hseih, T.; Moscati, A.; Hicks, T.E.; Okrent, D.

    1974-03-01

    The probabilities and potential consequences of dam failure in California, primarily due to large earthquakes, was estimated, taking as examples eleven dams having a relatively large population downstream. Mortalities in the event of dam failure range from 11,000 to 260,000, while damage to property may be as high as $720 million. It was assumed that an intensity IX or X earthquake (on the Modified Mercalli Scale) would be sufficient to completely fail earthen dams. Predictions of dam failure were based on the recurrence times of such earthquakes. For the dams studied, the recurrence intervals for an intensity IX earthquake varied between 20 and 800 years; for an intensity X between 50 and 30,000 years. For the Lake Chabot and San Pablo dams (respectively 20, 30 years recurrent earthquake times for a intensity X) the associated consequences are: 34,000 (Lake Chabot) and 30,000 (San Pablo) people killed; damage $140 million and $77 million. Evaculation was found to ameliorate the consequences slightly in most cases because of the short time available. Calculations are based on demography, and assume 10 foot floodwaters will drown all in their path and destroy all one-unit homes in the flood area. Damage estimates reflect losses incurred by structural damage to buildings and do not include loss of income. Hence the economic impact is probably understated.

  5. Annual report of National Institute of Radiological Sciences of the fiscal year 1992

    International Nuclear Information System (INIS)

    1994-01-01

    This annual report presents activities at the National Institute of Radiological Sciences (NIRS) in Japan during the period April 1992-March 1993. The activities are divided into research, technical aids, training, medical services, management, library or editing, and international cooperation. Research activities are arranged with twelve sections. The first section on special researches deals with continuing research projects entitled (1) 'Biological Risk Evaluation in Public Exposure', (2) 'Exposure Assessment in the Environment and the Public Through Food Chain', (3) 'Medical Use of Accelerated Heavy Ions', and (4) 'Preliminary Study for the Demonstration of Dose-Response Relationships in Low-Dose Range'. All projects except for project (4) will be finished up to March 1993. The section of assigned researches covers four titles. The section of ordinary researches covers physics (four titles), pharmacochemistry (four), biology (three), genetics (four), physiopathology (four), cytological radiation injuries (three), internal exposure (four), environmental science (four), clinical research (four), clinical research for radiation injuries (three), medical use of heavy particles (three), environmental radiation ecology (three), and aquatic radiation ecology (two). The section on technical aids gives an overview of technical services, radiation safety, animal and plant management, and cyclotron manaagement. Appendices give the information on personnel in NIRS. (N.K.)

  6. Dam spills and fishes

    International Nuclear Information System (INIS)

    1996-01-01

    This short paper reports the main topics discussed during the two days of the annual colloquium of the Hydro-ecology Committee of EdF. The first day was devoted to the presentation of the joint works carried out by EdF, the Paul-Sabatier University (Toulouse), the Provence St-Charles University (Marseille), the ENSAT (Toulouse) and the CEMAGREF (Lyon and Aix-en-Provence) about the environmental impact of dam spills on the aquatic flora and fauna downstream. A synthesis and recommendations were presented for the selection and characterization of future sites. The second day was devoted to the hydro-ecology study of the dam reservoir of Petit-Saut (French Guyana): water reoxygenation, quality evolution, organic matter, plankton, invertebrates and fishes. The 134 French dams concerned by water spills have been classified according to the frequency of spills, the variations of flow rates created, and their impacts on fishing, walking, irrigation, industry, drinking water, navigation, bathing. Particular studies on different sites have demonstrated the complexity of the phenomena involved concerning the impact on the ecosystems and the water quality. (J.S.)

  7. Studies of Columbia River water quality

    International Nuclear Information System (INIS)

    Onishi, Y.; Johanson, P.A.; Baca, R.G.; Hilty, E.L.

    1976-01-01

    The program to study the water quality of the Columbia River consists of two separate segments: sediment and radionuclide transport and temperature analysis. Quasi-two dimensional (longitudinal and vertical directions) mathematical simulation models were developed for determining radionuclide inventories, their variations with time, and movements of sediments and individual radionuclides in the freshwater region of the Columbia River below Priest Rapids Dam. These codes are presently being applied to the river reach between Priest Rapids and McNary Dams for the initial sensitivity analysis. In addition, true two-dimensional (longitudinal and lateral directions) models were formulated and are presently being programmed to provide more detailed information on sediment and radionuclide behavior in the river. For the temperature analysis program, river water temperature data supplied by the U. S. Geological Survey for six ERDA-sponsored temperature recording stations have been analyzed and cataloged on storage devices associated with ERDA's CDC 6600 located at Richland, Washington

  8. Grouting of karstic arch dam foundation

    Energy Technology Data Exchange (ETDEWEB)

    Young, J.; Rigbey, S. [Acres International, Niagara Falls, ON (Canada)

    2002-07-01

    A 200 m high arch dam and a 2000 MW underground power house complex is under development in the Middle East. The project is located in a highly seismic area in rugged, mountainous terrain. The arch dam is constructed on good quality limestone and dolomitic limestone rock mass, but it contains several zones of disturbed or sheared rock. The basement rock is slightly karstic with hydraulic conductivities in the order of 100 Lugeons. In order to get a satisfactory foundation surface for the dam, it will be necessary to excavate extensively and backfill with concrete. Because of the presence of many clay infilled cavities and fractures, geotechnicians are considering the installation of a multiple row grout curtain to a depth of 150 m below the dam foundation to ensure adequate seepage and uplift parameters when the reservoir is impounded. Initial grouting water pressure test results suggested that the grouting and drainage curtain should be extended to the left abutment beyond the current design. However, when horizontal slide models of the dam abutment were developed using the finite element program SEEPW, it was shown that there is no benefit to extending the length of grout curtains unless they are tied to an area of much lower hydraulic conductivity much deeper in the abutment. 1 tab., 5 figs.

  9. Lake Roosevelt Fisheries Monitoring Program; Artificial Imprinting and Smoltification in Juvenile Kokanee Salmon Implications for Operating Lake Roosevelt Kokanee Salmon Hatcheries; 1994 Supplement Report.

    Energy Technology Data Exchange (ETDEWEB)

    Tilson, Mary Beth; Scholz, Allan T.; White, Ronald J. (Eastern Washington University, Upper Columbia United Tribes Fisheries Research Center, Cheney, WA)

    1995-02-01

    At the kokanee salmon hatcheries on Lake Roosevelt, constructed as partial mitigation for effects from Grand Coulee Dam, adult returns have been poor. The reason may be in the imprinting or in the smoltification. A study was initiated in 1992 to determine if there was a critical period for thyroxine induced alfactory imprinting in kokanee salmon; experiments were conducted on imprinting to morpholine and phenethyl alcohol. Other results showed that chemical imprinting coincided with elevated thyroxine levels in 1991 kokanee exposed to synthetic chemicals in 1992. In this report, imprinting experiments were repeated; results showed that imprinting occurred concomitant with elevated thyroxine levels in 1991 kokanee exposed to synthetic chemicals in 1992 and tested in 1994 as age 3 spawners. Imprinting also occurred at the same time as thyroxine peaks in 1992 kokanee exposed to synthetic chemicals in 1993 and tested as age 2 spawners. In both groups fish that had the highest whole body thyroxine content (swimup stage) also had the highest percentage of fish that were attracted to their exposure odor in behavioral tests. So, kokanee salmon imprinted to chemical cues during two sensitive periods during development, at the alevin/swimup and smolt stages. A field test was conducted in Lake Roosevelt on coded wire tagged fish. Smoltification experiments were conducted from 1992 to 1994. Recommendations are made for the Lake Roosevelt kokanee hatcheries.

  10. Predictions of total deformations in Jebba main dam by finite ...

    African Journals Online (AJOL)

    This paper examined the deformations of the Jebba Main Dam, Jebba Nigeria using the finite element method. The study also evaluated the predicted deformations and compared them with the actual deformations in the dam to identify possible causes of the observed longitudinal crack at the dam crest. The Jebba dam is a ...

  11. Alberta Surface Reclamation Fund annual report, April 1, 1992 to March 31, 1993

    International Nuclear Information System (INIS)

    1993-01-01

    The Alberta Surface Reclamation Fund holds security deposits as an incentive to assure satisfactory reclamation of coal and oil sands exploration and coal, pipelines, sand and gravel and oil sands development operations. Upon satisfactory compliance, the funds are returned to the depositor. Where there is not satisfactory compliance, the Land Conservation and Reclamation Council is obligated to carry out the subsequent reclamation and the funds are used to complete the reclamation. This document also reports on the disposition of all non-cash security deposits which have been accepted instead of cash. During the year, $382,610 was refunded from coal exploration deposits, $82,226 was refunded from oil sands exploration deposits, $259,427 was refunded from pipeline development and reclamation deposits, and $94,421 was refunded from sand and gravel deposits where satisfactory reclamation had been completed. The fund, which is an integral part of the Consolidated Cash Investment Trust Fund administered by the Provincial Treasurer, earned between 6.15 and 7.85% interest on cash deposits calculated monthly. The interest accrues to the depositor's account on a quarterly basis. The total cash deposits plus interest, bonds and guaratees as of March 31, 1993 held in the fund was $116,199,168. The balance sheet and operating account summary summarize the fund and also provide details of each individual account

  12. Assessment of check-dam groundwater recharge with water-balance calculations

    Science.gov (United States)

    Djuma, Hakan; Bruggeman, Adriana; Camera, Corrado; Eliades, Marinos

    2017-04-01

    Studies on the enhancement of groundwater recharge by check-dams in arid and semi-arid environments mainly focus on deriving water infiltration rates from the check-dam ponding areas. This is usually achieved by applying simple water balance models, more advanced models (e.g., two dimensional groundwater models) and field tests (e.g., infiltrometer test or soil pit tests). Recharge behind the check-dam can be affected by the built-up of sediment as a result of erosion in the upstream watershed area. This natural process can increase the uncertainty in the estimates of the recharged water volume, especially for water balance calculations. Few water balance field studies of individual check-dams have been presented in the literature and none of them presented associated uncertainties of their estimates. The objectives of this study are i) to assess the effect of a check-dam on groundwater recharge from an ephemeral river; and ii) to assess annual sedimentation at the check-dam during a 4-year period. The study was conducted on a check-dam in the semi-arid island of Cyprus. Field campaigns were carried out to measure water flow, water depth and check-dam topography in order to establish check-dam water height, volume, evaporation, outflow and recharge relations. Topographic surveys were repeated at the end of consecutive hydrological years to estimate the sediment built up in the reservoir area of the check dam. Also, sediment samples were collected from the check-dam reservoir area for bulk-density analyses. To quantify the groundwater recharge, a water balance model was applied at two locations: at the check-dam and corresponding reservoir area, and at a 4-km stretch of the river bed without check-dam. Results showed that a check-dam with a storage capacity of 25,000 m3 was able to recharge to the aquifer, in four years, a total of 12 million m3 out of the 42 million m3 of measured (or modelled) streamflow. Recharge from the analyzed 4-km long river section without

  13. Dworshak Dam impacts assessment and fisheries investigation -- Kokanee depth distribution in Dworshak Reservoir and implications toward minimizing entrainment. Annual progress report, January--December 1994

    International Nuclear Information System (INIS)

    Maiolie, M.A.; Elam, S.

    1996-10-01

    The authors measured the day and night depth distribution of kokanee Oncorhynchus nerka kennerlyi directly upstream of Dworshak Dam from October 1993 to December 1994 using split-beam hydroacoustics. At night most kokanee (70%) were distributed in a diffuse layer about 10 m thick. The depth of the layer varied with the season and ranged from 30 to 40 m deep during winter and from 15 to 25 m deep during summer. Nighttime depth of the kokanee layer during summer roughly corresponded to a zone where water temperatures ranged from 7 C to 12 C. Daytime kokanee distribution was much different with kokanee located in dense schools. Most kokanee (70%) were found in a 5--15 m thick layer during summer. Daytime depth distribution was also shallowest during fall and deepest during winter. Dworshak Dam has structures which can be used for selective water withdrawal and can function in depth ranges that will avoid the kokanee layer. Temperature constraints limit the use of selective withdrawal during the spring, summer, and fall, but in the winter, water is nearly isothermal and the full range of selector gate depths may be utilized. From October 1993 to February 1994, selector gates were positioned to withdraw water from above the kokanee layer. The discharge pattern also changed with more water being released during May and July, and less water being released during fall and winter. A combination of these two changes is thought to have increased kokanee densities to a record high of 69 adults/ha

  14. Earthquake induced liquefaction analysis of Tendaho earth-fill dam ...

    African Journals Online (AJOL)

    fill dam, which is part of Tendaho Dam and Irrigation Project; the largest irrigation project in Ethiopia to date. The dam is located in the most seismic part of Ethiopia and was originally designed to be founded on potentially liquefiable alluvium ...

  15. Annual Report 1992

    International Nuclear Information System (INIS)

    1993-01-01

    A report is presented on the economy, businesses, finances, business strategy, environmental policy, human resources and social policy, and public relations of the joint stock company Ceske energeticke zavody (Czech Power Works). A review is given of business performance in 1992. As of 31 December 1992 the assets reached CZK 81,018,965, the profit was CZK 6,280,943. (J.B.)

  16. Dams and Obstructions along Iowa's Canoe Routes

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — This dataset represents obstruction to canoe and boat users of the canoe routes of Iowa. This may represent actual dams, rock dams (natural or man made), large...

  17. Ririe Dam Release Test Assessment

    Science.gov (United States)

    2013-06-01

    Notes HEC - RAS Location Station (ft) Observation Notes 1420 Ririe Dam Ririe Dam 119,880 Gates opened and initial release started. 1455 115th St...16°F air temperature. Table A2. Observations made on 11 February 2013. Time Location Notes HEC - RAS Location Station (ft) Observation Notes...ERDC/CRREL TR-13-10 52 Time Location Notes HEC - RAS Location Station (ft) Observation Notes Travel Time* (sec) Vel.** (fps) 1224 5th

  18. Grouting design for slope stability of kedung uling earthfill dam

    Directory of Open Access Journals (Sweden)

    Najib

    2018-01-01

    Full Text Available Kedung Uling earthfill dam locates at Wonogiri Regency, Central Java, Indonesia. The dam encountered sliding and settlement at the embankment wall. To minimize sliding and settlement and to optimize the dam, both field investigation and laboratory tests have been proceeded for slope stability analysis and remedial embankment wall. Soil and rock investigation around the dam, which is followed by 10 core drillings, have been conducted. Laboratory tests such as direct shear and index properties have also been carried on. The results were further used for dam slope stability model using slide 6.0 and were used to analyzed factor of safety (FS of Kedunguling dam. 10 conditions of dam were simulated and strengthening body of dam with grouting was designed. The results showed two conditions, which are condition of maximum water level with and without earthquake at downstream, were unsatisfy Indonesia National Standard (SNI for building and infrastructure. These conditions can be managed by using grouting for increasing stabilization of embankment wall. By setting up grouting, factor of safety increases and meet the SNI standard requirement.

  19. Non uniform nature of recorded ground accelerations at dam foundation interface

    Energy Technology Data Exchange (ETDEWEB)

    Ghaemian, Mohsen; Gilani, Morteza Sohrabi [Sharif University of Technology, Tehran, (Iran, Islamic Republic of); Noorzad, Ali [Power and Water University of Technology, Tehran, (Iran, Islamic Republic of)

    2010-07-01

    The Karun III is a double curved concrete arch dam located in Iran which was used to investigate earthquake motions and dam responses. This paper presented the study of the Karun III dam foundation interface. Using an array of 15 accelerometers, two major events that occurred on 2007.11.20 and 2007.11.21 were recorded during dam operation with a PGA at crest of 0.312 g and 0.109.g respectively. A finite element model of Karun III dam was performed. The response of the Karun III dam during the 2007 earthquake was investigated using the NSAD-DRI program. It was found that the motion of the dam foundation interface is non-uniform. There is a time shift and amplification at the abutment compared to those at the base of the dam. The results showed that the spatially varying earthquake assumption is in good agreement with the recorded displacement of the dam.

  20. Evolution of the Sensor Fish Device for Measuring Physical Conditions in Severe Hydraulic Environments

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Duncan, Joanne P.

    2003-02-28

    To assist in deriving biological specifications for design of turbine rehabilitation measures, new ''fish-friendly'' turbines, and spillway designs and operations, scientists at the Pacific Northwest National Laboratory (PNNL) have developed and tested an autonomous multi-sensor device called a Sensor Fish that can acquire pressure and tri-axial linear acceleration data during passage through severe hydraulic conditions. The purpose of the Sensor Fish is to characterize physical conditions fish experience during passage through hydro turbines, spill stilling basins, high-discharge outfalls, and other dam passage routes. The Sensor Fish was developed with the support of the U.S. Department of Energy's Advanced Hydropower Turbine System program. Field tests of the Sensor Fish at Rock Island, McNary, The Dalles, Bonneville, and Wanapum dams on the Columbia River and the Prosser Irrigation District on the Yakima River have shown that the device can withstand the severe environments of turbine, spill, and fish bypass passage and provide useful environmental data that can ultimately aid in the design and operation of new and existing turbines, spill, and dam fish bypass facilities.