WorldWideScience

Sample records for maximizing plant operations

  1. Discussion on: "Profit Maximization of a Power Plant"

    DEFF Research Database (Denmark)

    Boomsma (fhv. Kristoffersen), Trine Krogh; Fleten, Stein-Erik

    2012-01-01

    Kragelund et al. provides an interesting contribution to operations scheduling in liberalized electricity markets. They address the problem of profit maximization for a power plant participating in the electricity market. In particular, given that the plant has already been dispatched in a day...

  2. Improved NGL recovery designs maximize operating flexibility and product recoveries

    International Nuclear Information System (INIS)

    Wilkinson, J.D.; Hudson, H.M.

    1992-01-01

    This paper reports that the historically cyclical nature in the market for ethane and propane has demonstrated the need for flexible natural gas liquids (NGL) recovery plants. NEwly developed and patented processes are now available which can provide ultra-high recovery of ethane (95%+) when demand for ethane is high and provide essentially complete ethane rejection without the normally concomitant reduction in propane recovery. This provides plant operators the flexibility to respond more readily to NGL market conditions, thus maximizing plant operating profits. The new process designs provide this flexibility without increasing utility requirements. In fact, utility consumption is often lower when compared to conventional designs. This same process technology can also be easily retrofit into existing plants with relatively quick payout of the modifications from both recovery and efficiency improvements

  3. Strategy to maximize maintenance operation

    OpenAIRE

    Espinoza, Michael

    2005-01-01

    This project presents a strategic analysis to maximize maintenance operations in Alcan Kitimat Works in British Columbia. The project studies the role of maintenance in improving its overall maintenance performance. It provides strategic alternatives and specific recommendations addressing Kitimat Works key strategic issues and problems. A comprehensive industry and competitive analysis identifies the industry structure and its competitive forces. In the mature aluminium industry, the bargain...

  4. Outer measures and weak type estimates of Hardy-Littlewood maximal operators

    Directory of Open Access Journals (Sweden)

    Terasawa Yutaka

    2006-01-01

    Full Text Available We will introduce the times modified centered and uncentered Hardy-Littlewood maximal operators on nonhomogeneous spaces for . We will prove that the times modified centered Hardy-Littlewood maximal operator is weak type bounded with constant when if the Radon measure of the space has "continuity" in some sense. In the proof, we will use the outer measure associated with the Radon measure. We will also prove other results of Hardy-Littlewood maximal operators on homogeneous spaces and on the real line by using outer measures.

  5. Maximizing plant density affects broccoli yield and quality

    Science.gov (United States)

    Increased demand for fresh market bunch broccoli (Brassica oleracea L. var. italica) has led to increased production along the United States east coast. Maximizing broccoli yields is a primary concern for quickly expanding southeastern commercial markets. This broccoli plant density study was carr...

  6. Maximize the operating profit of a SWRO-PRO integrated process for optimal water production and energy recovery

    KAUST Repository

    Wan, Chun Feng; Chung, Neal Tai-Shung

    2016-01-01

    Pressure retarded osmosis (PRO) is a promising technology to reduce the specific energy consumption and the operating expenditure of a seawater reverse osmosis (SWRO) plant. In this study, a simple analytical PRO model is developed to predict the PRO performance as the dilution of draw solutions occurs. The model can predict the PRO performance with a high accuracy without carrying out complicated integrations and experiments. The operating profit of SWRO-PRO is also studied by calculating the profit generated for every m3 of seawater entering the process because maximizing the operating profit is the uttermost objective of the SWRO-PRO process. Based on the PRO analytical model, the operating profit and the dynamics of the SWRO-PRO process, a strategy has been proposed to maximize the operating profit of the SWRO-PRO process while maintaining the highest power density of the PRO membranes. This study proves that integration of SWRO with PRO can (1) push the SWRO to a higher recovery and maintain its high profitability, (2) effectively reduce the specific energy consumption of desalination by up to 35% and (3) increase the operating profit up to 100%. © 2016 Elsevier Ltd.

  7. Maximize the operating profit of a SWRO-PRO integrated process for optimal water production and energy recovery

    KAUST Repository

    Wan, Chun Feng

    2016-03-28

    Pressure retarded osmosis (PRO) is a promising technology to reduce the specific energy consumption and the operating expenditure of a seawater reverse osmosis (SWRO) plant. In this study, a simple analytical PRO model is developed to predict the PRO performance as the dilution of draw solutions occurs. The model can predict the PRO performance with a high accuracy without carrying out complicated integrations and experiments. The operating profit of SWRO-PRO is also studied by calculating the profit generated for every m3 of seawater entering the process because maximizing the operating profit is the uttermost objective of the SWRO-PRO process. Based on the PRO analytical model, the operating profit and the dynamics of the SWRO-PRO process, a strategy has been proposed to maximize the operating profit of the SWRO-PRO process while maintaining the highest power density of the PRO membranes. This study proves that integration of SWRO with PRO can (1) push the SWRO to a higher recovery and maintain its high profitability, (2) effectively reduce the specific energy consumption of desalination by up to 35% and (3) increase the operating profit up to 100%. © 2016 Elsevier Ltd.

  8. Minimal and Maximal Operator Space Structures on Banach Spaces

    OpenAIRE

    P., Vinod Kumar; Balasubramani, M. S.

    2014-01-01

    Given a Banach space $X$, there are many operator space structures possible on $X$, which all have $X$ as their first matrix level. Blecher and Paulsen identified two extreme operator space structures on $X$, namely $Min(X)$ and $Max(X)$ which represents respectively, the smallest and the largest operator space structures admissible on $X$. In this note, we consider the subspace and the quotient space structure of minimal and maximal operator spaces.

  9. Concentrating solar power plant investment and operation decisions under different price and support mechanisms

    International Nuclear Information System (INIS)

    Kost, Christoph; Flath, Christoph M.; Möst, Dominik

    2013-01-01

    The dispatch opportunities provided by storage-enhanced Concentrating Solar Power (CSP) plants have direct implications on the investment decisions as not only nameplate capacity but also the storage capacity and the solar multiple play a crucial role for the viability of the plant investment. By integrating additional technical aspects and operation strategies, this paper extends the optimization model proposed by Madaeni et al., How Thermal Energy Storage Enhances the Economic Viability of Concentrating Solar Power. Using a mixed integer maximization approach the paper yields both the optimal layout decision and the operation of CSP plants. Subsequently, the economic value of CSP storage is analyzed via energy modeling of a Spanish plant location under the respective wholesale market prices as well as the local feed-in tariff. The analysis shows that investment incentives for CSP plants with storage need to appropriately account for the interdependency between the price incentives and the plant operating strategy. As the resulting revenue characteristics influence the optimal size of solar field and storage differing operating strategies also give rise to differing optimal plant layouts. Most noteworthy, the current Spanish support scheme offers only limited incentives for larger thermal storage capacity. - Highlights: • Dispatch opportunities of CSP have direct implications on both investment and operational decisions. • Valuation approach with a single mixed integer maximization problem. • Profitability of CSP plants under the premium feed-in tariff in Spain was assessed. • Layout decision and storage size are influenced by remuneration scheme. • Discuss alternative remuneration schemes for “dispatchable” RE technologies

  10. Nuclear power plant simulators for operator licensing and training. Part I. The need for plant-reference simulators. Part II. The use of plant-reference simulators

    International Nuclear Information System (INIS)

    Rankin, W.L.; Bolton, P.A.; Shikiar, R.; Saari, L.M.

    1984-05-01

    Part I of this report presents technical justification for the use of plant-reference simulators in the licensing and training of nuclear power plant operators and examines alternatives to the use of plant-reference simulators. The technical rationale is based on research on the use of simulators in other industries, psychological learning and testing principles, expert opinion and user opinion. Part II discusses the central considerations in using plant-reference simulators for licensing examination of nuclear power plant operators and for incorporating simulators into nuclear power plant training programs. Recommendations are presented for the administration of simulator examinations in operator licensing that reflect the goal of maximizing both reliability and validity in the examination process. A series of organizational tasks that promote the acceptance, use, and effectiveness of simulator training as part of the onsite training program is delineated

  11. Cut-off Grade Optimization for Maximizing the Output Rate

    Directory of Open Access Journals (Sweden)

    A. Khodayari

    2012-12-01

    Full Text Available In the open-pit mining, one of the first decisions that must be made in production planning stage, after completing the design of final pit limits, is determining of the processing plant cut-off grade. Since this grade has an essential effect on operations, choosing the optimum cut-off grade is of considerable importance. Different goals may be used for determining optimum cut-off grade. One of these goals may be maximizing the output rate (amount of product per year, which is very important, especially from marketing and market share points of view. Objective of this research is determining the optimum cut-off grade of processing plant in order to maximize output rate. For performing this optimization, an Operations Research (OR model has been developed. The object function of this model is output rate that must be maximized. This model has two operational constraints namely mining and processing restrictions. For solving the model a heuristic method has been developed. Results of research show that the optimum cut-off grade for satisfying pre-stated goal is the balancing grade of mining and processing operations, and maximum production rate is a function of the maximum capacity of processing plant and average grade of ore that according to the above optimum cut-off grade must be sent to the plant.

  12. Magellan Project: Evolving enhanced operations efficiency to maximize science value

    Science.gov (United States)

    Cheuvront, Allan R.; Neuman, James C.; Mckinney, J. Franklin

    1994-01-01

    Magellan has been one of NASA's most successful spacecraft, returning more science data than all planetary spacecraft combined. The Magellan Spacecraft Team (SCT) has maximized the science return with innovative operational techniques to overcome anomalies and to perform activities for which the spacecraft was not designed. Commanding the spacecraft was originally time consuming because the standard development process was envisioned as manual tasks. The Program understood that reducing mission operations costs were essential for an extended mission. Management created an environment which encouraged automation of routine tasks, allowing staff reduction while maximizing the science data returned. Data analysis and trending, command preparation, and command reviews are some of the tasks that were automated. The SCT has accommodated personnel reductions by improving operations efficiency while returning the maximum science data possible.

  13. Optimal short-term operation schedule of a hydropower plant in a competitive electricity market

    International Nuclear Information System (INIS)

    Perez-Diaz, Juan I.; Wilhelmi, Jose R.; Arevalo, Luis A.

    2010-01-01

    This paper presents a dynamic programming model to solve the short-term scheduling problem of a hydropower plant that sells energy in a pool-based electricity market with the objective of maximizing the revenue. This is a nonlinear and non-concave problem subject to strong technical and strategic constraints, and in which discrete and continuous variables take part. The model described in this paper determines, in each hour of the planning horizon (typically from one day to one week), both the optimal number of units in operation (unit commitment) and the power to be generated by the committed units (generation dispatch). The power generated by each unit is considered as a nonlinear function of the actual water discharge and volume of the associated reservoir. The dependence of the units' efficiency and operating limits with the available gross head is also accounted for in this model. The application of this model to a real hydropower plant demonstrates its capabilities in providing the operation schedule that maximizes the revenue of the hydro plant while satisfying several constraints of different classes. In addition, the use of this model as a supporting tool to estimate the economic feasibility of a hydropower plant development project is also analyzed in the paper. (author)

  14. Third-order nonlinear differential operators preserving invariant subspaces of maximal dimension

    International Nuclear Information System (INIS)

    Qu Gai-Zhu; Zhang Shun-Li; Li Yao-Long

    2014-01-01

    In this paper, third-order nonlinear differential operators are studied. It is shown that they are quadratic forms when they preserve invariant subspaces of maximal dimension. A complete description of third-order quadratic operators with constant coefficients is obtained. One example is given to derive special solutions for evolution equations with third-order quadratic operators. (general)

  15. Multi-objective optimization for the maximization of the operating share of cogeneration system in District Heating Network

    International Nuclear Information System (INIS)

    Franco, Alessandro; Versace, Michele

    2017-01-01

    Highlights: • Combined Heat and Power plants and civil/residential energy uses. • CHP plant supported by auxiliary boilers and thermal energy storage. • Definition of optimal operational strategies for cogeneration plants for District Heating. • Optimal-sized Thermal Energy Storage and a hybrid operational strategy. • Maximization of cogeneration share and reduction of time of operation of auxiliary boilers. - Abstract: The aim of the paper is to define optimal operational strategies for Combined Heat and Power plants connected to civil/residential District Heating Networks. The role of a reduced number of design variables, including a Thermal Energy Storage system and a hybrid operational strategy dependent on the storage level, is considered. The basic principle is to reach maximum efficiency of the system operation through the utilization of an optimal-sized Thermal Energy Storage. Objective functions of both energetic and combined energetic and economic can be considered. In particular, First and Second Law Efficiency, thermal losses of the storage, number of starts and stops of the combined heat and power unit are considered. Constraints are imposed to nullify the waste of heat and to operate the unit at its maximum efficiency for the highest possible number of consecutive operating hours, until the thermal tank cannot store more energy. The methodology is applied to a detailed case study: a medium size district heating system, in an urban context in the northern Italy, powered by a combined heat and power plant supported by conventional auxiliary boilers. The issues involving this type of thermal loads are also widely investigated in the paper. An increase of Second Law Efficiency of the system of 26% (from 0.35 to 0.44) can be evidenced, while the First Law Efficiency shifts from about 0.74 to 0.84. The optimization strategy permits of combining the economic benefit of cogeneration with the idea of reducing the energy waste and exergy losses.

  16. On differential operators generating iterative systems of linear ODEs of maximal symmetry algebra

    Science.gov (United States)

    Ndogmo, J. C.

    2017-06-01

    Although every iterative scalar linear ordinary differential equation is of maximal symmetry algebra, the situation is different and far more complex for systems of linear ordinary differential equations, and an iterative system of linear equations need not be of maximal symmetry algebra. We illustrate these facts by examples and derive families of vector differential operators whose iterations are all linear systems of equations of maximal symmetry algebra. Some consequences of these results are also discussed.

  17. Strong Convergence of Monotone Hybrid Method for Maximal Monotone Operators and Hemirelatively Nonexpansive Mappings

    Directory of Open Access Journals (Sweden)

    Chakkrid Klin-eam

    2009-01-01

    Full Text Available We prove strong convergence theorems for finding a common element of the zero point set of a maximal monotone operator and the fixed point set of a hemirelatively nonexpansive mapping in a Banach space by using monotone hybrid iteration method. By using these results, we obtain new convergence results for resolvents of maximal monotone operators and hemirelatively nonexpansive mappings in a Banach space.

  18. Tight upper bound for the maximal quantum value of the Svetlichny operators

    Science.gov (United States)

    Li, Ming; Shen, Shuqian; Jing, Naihuan; Fei, Shao-Ming; Li-Jost, Xianqing

    2017-10-01

    It is a challenging task to detect genuine multipartite nonlocality (GMNL). In this paper, the problem is considered via computing the maximal quantum value of Svetlichny operators for three-qubit systems and a tight upper bound is obtained. The constraints on the quantum states for the tightness of the bound are also presented. The approach enables us to give the necessary and sufficient conditions of violating the Svetlichny inequality (SI) for several quantum states, including the white and color noised Greenberger-Horne-Zeilinger (GHZ) states. The relation between the genuine multipartite entanglement concurrence and the maximal quantum value of the Svetlichny operators for mixed GHZ class states is also discussed. As the SI is useful for the investigation of GMNL, our results give an effective and operational method to detect the GMNL for three-qubit mixed states.

  19. Optimal Operation of Network-Connected Combined Heat and Powers for Customer Profit Maximization

    Directory of Open Access Journals (Sweden)

    Da Xie

    2016-06-01

    Full Text Available Network-connected combined heat and powers (CHPs, owned by a community, can export surplus heat and electricity to corresponding heat and electric networks after community loads are satisfied. This paper proposes a new optimization model for network-connected CHP operation. Both CHPs’ overall efficiency and heat to electricity ratio (HTER are assumed to vary with loading levels. Based on different energy flow scenarios where heat and electricity are exported to the network from the community or imported, four profit models are established accordingly. They reflect the different relationships between CHP energy supply and community load demand across time. A discrete optimization model is then developed to maximize the profit for the community. The models are derived from the intervals determined by the daily operation modes of CHP and real-time buying and selling prices of heat, electricity and natural gas. By demonstrating the proposed models on a 1 MW network-connected CHP, results show that the community profits are maximized in energy markets. Thus, the proposed optimization approach can help customers to devise optimal CHP operating strategies for maximizing benefits.

  20. The System 80+ standard plant design reduces operations and maintenance costs

    International Nuclear Information System (INIS)

    Chari, D.R.; Robertson, J.E.

    1998-01-01

    To be cost-competitive, nuclear power plants must maximize plant availability and minimize operations and maintenance (O and M) costs. A plant whose design supports these goals will generate more power at less cost and thereby have a lower unit generating cost. The ABB Combustion Engineering Nuclear Systems (ABB-CE) System 80+ Standard Nuclear Power Plant, rated at 1400 megawatts electric (MWe), is designed for high availability at reduced cost. To demonstrate that the duration of refueling outages, the major contributor to plant unavailability, can be shortened, ABB-CE developed a detailed plan that shows a System 80+ plant can safely perform a refueling and maintenance outage in 18 days. This is a significant reduction from the average current U.S. plant outages of 45 days, and is possible due to a two-part outage strategy: use System 80+ advanced system design features and relaxed technical specification (TS) time limits to shift some maintenance from outages to operating periods: and, use System 80+ structural, system, and component features, such as the larger operating floor, permanent pool seal, integral reactor head area cable tray system and missile shield, and longer life reactor coolant pump seals, to reduce the scope and duration of outage maintenance activities. Plant staffing level is the major variable, or controllable contributor to operations costs. ABB-CE worked with the Institute of Nuclear Power Operations (INPO) to perform detailed staffing analyses that show a System 80+ plant can be operated reliably with 30 percent less staff than currently operating nuclear plants of similar size. Safety was not sacrificed when ABB-CE developed the System 80+ refueling outage plan and staffing level. The outage plan was developed utilizing a defense-in-depth concept for shutdown safety. The defense in-depth concept is implemented via systematic control of outage risk evaluation (SCORE) cards. The SCORE cards identify primary and alternate means of

  1. Two-loop controller for maximizing performance of a grid-connected photovoltaic - fuel cell hybrid power plant

    Science.gov (United States)

    Ro, Kyoungsoo

    The study started with the requirement that a photovoltaic (PV) power source should be integrated with other supplementary power sources whether it operates in a stand-alone or grid-connected mode. First, fuel cells for a backup of varying PV power were compared in detail with batteries and were found to have more operational benefits. Next, maximizing performance of a grid-connected PV-fuel cell hybrid system by use of a two-loop controller was discussed. One loop is a neural network controller for maximum power point tracking, which extracts maximum available solar power from PV arrays under varying conditions of insolation, temperature, and system load. A real/reactive power controller (RRPC) is the other loop. The RRPC meets the system's requirement for real and reactive powers by controlling incoming fuel to fuel cell stacks as well as switching control signals to a power conditioning subsystem. The RRPC is able to achieve more versatile control of real/reactive powers than the conventional power sources since the hybrid power plant does not contain any rotating mass. Results of time-domain simulations prove not only effectiveness of the proposed computer models of the two-loop controller, but also their applicability for use in transient stability analysis of the hybrid power plant. Finally, environmental evaluation of the proposed hybrid plant was made in terms of plant's land requirement and lifetime COsb2 emissions, and then compared with that of the conventional fossil-fuel power generating forms.

  2. A mixture of "cheats" and "co-operators" can enable maximal group benefit.

    Directory of Open Access Journals (Sweden)

    R Craig MaClean

    Full Text Available Is a group best off if everyone co-operates? Theory often considers this to be so (e.g. the "conspiracy of doves", this understanding underpinning social and economic policy. We observe, however, that after competition between "cheat" and "co-operator" strains of yeast, population fitness is maximized under co-existence. To address whether this might just be a peculiarity of our experimental system or a result with broader applicability, we assemble, benchmark, dissect, and test a systems model. This reveals the conditions necessary to recover the unexpected result. These are 3-fold: (a that resources are used inefficiently when they are abundant, (b that the amount of co-operation needed cannot be accurately assessed, and (c the population is structured, such that co-operators receive more of the resource than the cheats. Relaxing any of the assumptions can lead to population fitness being maximized when cheats are absent, which we experimentally demonstrate. These three conditions will often be relevant, and hence in order to understand the trajectory of social interactions, understanding the dynamics of the efficiency of resource utilization and accuracy of information will be necessary.

  3. Review of operational aids for nuclear plant operators

    International Nuclear Information System (INIS)

    Kisner, R.A.

    1983-01-01

    Many approaches are being explored to improve the safety of nuclear plant operations. One approach is to supply high-quality, relevant information by means of computer-based diagnostic systems to assist plant operators in performing their operational and safety-related roles. The evaluation of operational aids to ensure safe plant operations is a necessary function of NRC. This work has two purposes: to collect limited data on a diversity of operational aids, and to provide a method for evaluating the safety implications of the functions of proposed operational aids. After a discussion of the method evaluation now under study, this paper outlines this data collection to date

  4. The one-sided Ap conditions and local maximal operator

    Czech Academy of Sciences Publication Activity Database

    Bernardis, A.L.; Gogatishvili, Amiran; Martin-Reyes, F. J.; Ortega Salvador, P.; Pick, L.

    Roč. 55, č. 1 ( 2012 ), s. 79-104 ISSN 0013-0915 R&D Projects: GA ČR GA201/08/0383; GA ČR GA201/05/2033 Institutional research plan: CEZ:AV0Z10190503 Keywords : one-sided Ap conditions * one-sided local maximal operator * quasi-Banach function spaces * variable-exponent Lebesgue spaces Subject RIV: BA - General Mathematics Impact factor: 0.561, year: 2012 http://journals.cambridge.org/action/displayAbstract?fromPage=online&aid=8477114&fulltextType=RA&fileId=S0013091510000635

  5. Plant operator performance evaluation system

    International Nuclear Information System (INIS)

    Ujita, Hiroshi; Fukuda, Mitsuko; Kubota, Ryuji.

    1989-01-01

    A plant operator performance evaluation system to analyze plant operation records during accident training and to identify and classify operator errors has been developed for the purpose of supporting realization of a training and education system for plant operators. A knowledge engineering technique was applied to evaluation of operator behavior by both even-based and symptom-based procedures, in various situations including event transition due to multiple failures or operational errors. The system classifies the identified errors as to their single and double types based on Swain's error classification and the error levels reflecting Rasmussen's cognitive level, and it also evaluates the effect of errors on plant state and then classifies error influence, using 'knowledge for phenomena and operations', as represented by frames. It has additional functions for analysis of error statistics and knowledge acquisition support of 'knowledge for operations'. The system was applied to a training analysis for a scram event in a BWR plant, and its error analysis function was confirmed to be effective by operational experts. (author)

  6. MAXIMIZING HYDROPOWER PRODUCTION FROM RESERVOIRS:THE CASE STUDY OF MARKABA

    International Nuclear Information System (INIS)

    Jaafar, H.

    2014-01-01

    Hydropower is a form of renewable energy that is clean and cheap. Under uncertain climatic conditions, maximization of hydropower production becomes a challenging task.Stochastic Dynamic programming (SDP) is a promising optimization algorithm that is usedfor complex non-linear reservoir operational policies and strategies.In this research, a combined simulation-SDPoptimization model isdeveloped andverified for maximizing large-scale hydropower production in a monthly time step. The model isdeveloped to generate optimal operational policies for the Qarawn reservoir in Lebanon and test these policies in real time conditions. The model isused to derive operational regimes for the Qarawn reservoirunder varying flows using transitional probability matrices. Simulating the derived rules and the generated operational policies proved effective in maximizingthe hydropower production from the Markaba power plant. The model could be successfully applied to other hydropower dams in the region. (author)

  7. Modeling Multioperator Multi-UAV Operator Attention Allocation Problem Based on Maximizing the Global Reward

    Directory of Open Access Journals (Sweden)

    Yuhang Wu

    2016-01-01

    Full Text Available This paper focuses on the attention allocation problem (AAP in modeling multioperator multi-UAV (MOMU, with the operator model and task properties taken into consideration. The model of MOMU operator AAP based on maximizing the global reward is established and used to allocate tasks to all operators as well as set work time and rest time to each task simultaneously for operators. The proposed model is validated in Matlab simulation environment, using the immune algorithm and dynamic programming algorithm to evaluate the performance of the model in terms of the reward value with regard to the work time, rest time, and task allocation. The result shows that the total reward of the proposed model is larger than the one obtained from previously published methods using local maximization and the total reward of our method has an exponent-like relation with the task arrival rate. The proposed model can improve the operators’ task processing efficiency in the MOMU command and control scenarios.

  8. Kvanefjeld refinery pilot plant operations

    International Nuclear Information System (INIS)

    Krebs, Damien; Furfaro, Domenic

    2016-01-01

    Greenland Minerals and Energy is a junior project development company which is listed on the Australian Stock Exchange (asx:GGG). It is developing the Kvanefjeld rare earth and uranium project located in the southern tip of Greenland. The project has completed a Feasibility Study and is currently in the permitting phase. Last year was a busy time for the company as it completed a Feasibility Study, a mining licence application (draft submitted in December 2015) and pilot plant operations. Beneficiation pilot plant operations were completed at GTK in Finland in April 2015. This pilot plant treated approximately 30 tonnes of ore to producing almost 2 tonnes of rare earth mineral concentrate. Later in the year a hydrometallurgical pilot plant was performed which mimicked the Refinery process. This pilot plant was performed at Outotec’s Pori Research laboratories in Finland from September till October 2015. The pilot plant treated approximately 200 kilograms of concentrate over 4 split operating campaigns. Each campaign was performed to focus on the performance of a specific part of the refinery flowsheet. This allowed for full operating focus on a single unit operation to ensure that it was operating correctly. The pilot plant operations were quite successful with no major issues with the flowsheet identified through continuous operation. Some fine tuning of conditions was required to ensure adequate removal of impurities was performed with recycle streams incorporated. Overall the leach extractions observed in the pilot plant exceeded the design assumptions in the Feasibility Study. These programs were partially funded by the EURARE program. The EURARE program aims to encourage the sustainable development of European based rare earth projects. This has the goal of allowing Europe to become less reliant on importation of these key raw materials. The professionalism and performance of both GTK and Outotec contributed significantly to the success of the pilot plant

  9. Eigenvalue for Densely Defined Perturbations of Multivalued Maximal Monotone Operators in Reflexive Banach Spaces

    Directory of Open Access Journals (Sweden)

    Boubakari Ibrahimou

    2013-01-01

    maximal monotone with and . Using the topological degree theory developed by Kartsatos and Quarcoo we study the eigenvalue problem where the operator is a single-valued of class . The existence of continuous branches of eigenvectors of infinite length then could be easily extended to the case where the operator is multivalued and is investigated.

  10. Organizing nuclear power plant operation

    International Nuclear Information System (INIS)

    Adams, H.W.; Rekittke, K.

    1987-01-01

    With the preliminary culmination in the convoy plants of the high standard of engineered safeguards in German nuclear power plants developed over the past twenty years, the interest of operators has now increasingly turned to problems which had not been in the focus of attention before. One of these problems is the organization of nuclear power plant operation. In order to enlarge the basis of knowledge, which is documented also in the rules published by the Kerntechnischer Ausschuss (Nuclear Technology Committee), the German Federal Minister of the Interior has commissioned a study of the organizational structures of nuclear power plants. The findings of that study are covered in the article. Two representative nuclear power plants in the Federal Republic of Germany were selected for the study, one of them a single-unit plant run by an independent operating company in the form of a private company under German law (GmbH), the other a dual-unit plant operated as a dependent unit of a utility. The two enterprises have different structures of organization. (orig.) [de

  11. Nuclear power plant operator licensing

    International Nuclear Information System (INIS)

    1997-01-01

    The guide applies to the nuclear power plant operator licensing procedure referred to the section 128 of the Finnish Nuclear Energy Degree. The licensing procedure applies to shift supervisors and those operators of the shift teams of nuclear power plant units who manipulate the controls of nuclear power plants systems in the main control room. The qualification requirements presented in the guide also apply to nuclear safety engineers who work in the main control room and provide support to the shift supervisors, operation engineers who are the immediate superiors of shift supervisors, heads of the operational planning units and simulator instructors. The operator licensing procedure for other nuclear facilities are decided case by case. The requirements for the basic education, work experience and the initial, refresher and complementary training of nuclear power plant operating personnel are presented in the YVL guide 1.7. (2 refs.)

  12. Operation monitor for plant equipment

    International Nuclear Information System (INIS)

    Kondo, Tetsufumi; Kanemoto, Shigeru.

    1991-01-01

    In a nuclear power plant, states of each of equipment in the plant are monitored accurately even under such a operation condition that the power is changed. That is, the fundamental idea is based on a model comparison method. A deviation between an output signal upon normal plant state obtained in a forecasting model device and that of the objective equipment in the plant are compared with a predetermined value. The result of the comparison is inputted to an alarm device to alarm the abnormality of the states of the equipment to an operator. The device of the present invention thus constituted can monitor the abnormality of the operation of equipment accurately even under such a condition that a power level fluctuates. As a result, it can remarkably contribute to mitigate operator's monitoring operation under the condition such as during load following operation. (I.S.)

  13. Operational safety review programmes for nuclear power plants. Guidelines for assessment

    International Nuclear Information System (INIS)

    2002-01-01

    The IAEA has been offering the Operational Safety Review Team (OSART) programme to provide advice and assistance to Member States in enhancing the operational safety of nuclear power plants (NPPs). Simultaneously, the IAEA has encouraged self-assessment and review by Member States of their own nuclear power plants to continuously improve nuclear safety. Currently, some utilities have been implementing safety review programmes to independently review their own plants. Corporate or national operational safety review programmes may be compliance or performance based. Successful utilities have found that both techniques are necessary to provide assurance that (i) as a minimum the NPP meets specific corporate and legal requirements and (ii) management at the NPP is encouraged to pursue continuous improvement principles. These programmes can bring nuclear safety benefits to the plants and utilities. The IAEA has conducted two pilot missions to assess the effectiveness of the operational review programme. Based on these missions and on the experience gained during OSART missions, this document has been developed to provide guidance on and broaden national/corporate safety review programmes in Member States, and to assist in maximizing their benefits. These guidelines are intended primarily for the IAEA team to conduct assessment of a national/corporate safety review programme. However, this report may also be used by a country or utility to establish its own national/corporate safety review programme. The guidelines may likewise be used for self-assessment or for establishing a baseline when benchmarking other safety review programmes. This report consists of four parts. Section 2 addresses the planning and preparation of an IAEA assessment mission and Sections 3 and 4 deal with specific guidelines for conducting the assessment mission itself

  14. An analyser for power plant operations

    International Nuclear Information System (INIS)

    Rogers, A.E.; Wulff, W.

    1990-01-01

    Safe and reliable operation of power plants is essential. Power plant operators need a forecast of what the plant will do when its current state is disturbed. The in-line plant analyser provides precisely this information at relatively low cost. The plant analyser scheme uses a mathematical model of the dynamic behaviour of the plant to establish a numerical simulation. Over a period of time, the simulation is calibrated with measurements from the particular plant in which it is used. The analyser then provides a reference against which to evaluate the plant's current behaviour. It can be used to alert the operator to any atypical excursions or combinations of readings that indicate malfunction or off-normal conditions that, as the Three Mile Island event suggests, are not easily recognised by operators. In a look-ahead mode, it can forecast the behaviour resulting from an intended change in settings or operating conditions. Then, when such changes are made, the plant's behaviour can be tracked against the forecast in order to assure that the plant is behaving as expected. It can be used to investigate malfunctions that have occurred and test possible adjustments in operating procedures. Finally, it can be used to consider how far from the limits of performance the elements of the plant are operating. Then by adjusting settings, the required power can be generated with as little stress as possible on the equipment. (6 figures) (Author)

  15. Optimal sizing of utility-scale photovoltaic power generation complementarily operating with hydropower: A case study of the world’s largest hydro-photovoltaic plant

    International Nuclear Information System (INIS)

    Fang, Wei; Huang, Qiang; Huang, Shengzhi; Yang, Jie; Meng, Erhao; Li, Yunyun

    2017-01-01

    Highlights: • Feasibility of complementary hydro-photovoltaic operation across the world is revealed. • Three scenarios of the novel operation mode are proposed to satisfy different load demand. • A method for optimally sizing a utility-scale photovoltaic plant is developed by maximizing the net revenue during lifetime. • The influence of complementary hydro-photovoltaic operation upon water resources allocation is investigated. - Abstract: The high variability of solar energy makes utility-scale photovoltaic power generation confront huge challenges to penetrate into power system. In this paper, the complementary hydro-photovoltaic operation is explored, aiming at improving the power quality of photovoltaic and promoting the integration of photovoltaic into the system. First, solar-rich and hydro-rich regions across the world are revealed, which are suitable for implementing the complementary hydro-photovoltaic operation. Then, three practical scenarios of the novel operation mode are proposed for better satisfying different types of load demand. Moreover, a method for optimal sizing of a photovoltaic plant integrated into a hydropower plant is developed by maximizing the net revenue during lifetime. Longyangxia complementary hydro-photovoltaic project, the current world’s largest hydro-photovoltaic power plant, is selected as a case study and its optimal photovoltaic capacities of different scenarios are calculated. Results indicate that hydropower installed capacity and annual solar curtailment rate play crucial roles in the size optimization of a photovoltaic plant and complementary hydro-photovoltaic operation exerts little adverse effect upon the water resources allocation of Longyangxia reservoir. The novel operation mode not only improves the penetration of utility-scale photovoltaic power generation but also can provide a valuable reference for the large-scale utilization of other kinds of renewable energy worldwide.

  16. Macroscopic mass and energy balance of a pilot plant anaerobic bioreactor operated under thermophilic conditions.

    Science.gov (United States)

    Espinosa-Solares, Teodoro; Bombardiere, John; Chatfield, Mark; Domaschko, Max; Easter, Michael; Stafford, David A; Castillo-Angeles, Saul; Castellanos-Hernandez, Nehemias

    2006-01-01

    Intensive poultry production generates over 100,000 t of litter annually in West Virginia and 9 x 10(6) t nationwide. Current available technological alternatives based on thermophilic anaerobic digestion for residuals treatment are diverse. A modification of the typical continuous stirred tank reactor is a promising process being relatively stable and owing to its capability to manage considerable amounts of residuals at low operational cost. A 40-m3 pilot plant digester was used for performance evaluation considering energy input and methane production. Results suggest some changes to the pilot plant configuration are necessary to reduce power consumption although maximizing biodigester performance.

  17. Increasing plant density in eastern United States broccoli production systems to maximize marketable head yields

    Science.gov (United States)

    Increased demand for fresh market broccoli (Brassica oleracea L. var. italica) has led to increased production along the eastern seaboard of the United States. Maximizing broccoli yields is a primary concern for quickly expanding eastern commercial markets. Thus, a plant density study was carried ...

  18. Plant operator selection system for evaluating employment candidates' potential for success in electric power plant operations positions

    International Nuclear Information System (INIS)

    Dunnette, M.D.

    1982-01-01

    The Plant Operator Selection System is a battery of tests and questionnaires that can be administered to job candidates in less than three hours. Various components of the battery measure what a job candidate has accomplished in previous educational and work situations, how well a candidate compares with others on a number of important aptitudes or abilities, and whether or not a candidate possesses the kind of personal stability required in power plant operations positions. A job candidate's answers to the tests and questionnaires of the Plant Operator Selection System are scored and converted to an OVERALL POTENTIAL INDEX. Values of the OVERALL POTENTIAL INDEX [OPI] range between 0 and 15. Candidates with high OPI values are much more likely to become effective and successful plant operators than candidates with low OPI values. It is possible to estimate the financial advantages to a company of using the Plant Operator Selection System in evaluating candidates for plant operations jobs

  19. The hybrid MPC-MINLP algorithm for optimal operation of coal-fired power plants with solvent based post-combustion CO2 capture

    Directory of Open Access Journals (Sweden)

    Norhuda Abdul Manaf

    2017-03-01

    Full Text Available This paper presents an algorithm that combines model predictive control (MPC with MINLP optimization and demonstrates its application for coal-fired power plants retrofitted with solvent based post-combustion CO2 capture (PCC plant. The objective function of the optimization algorithm works at a primary level to maximize plant economic revenue while considering an optimal carbon capture profile. At a secondary level, the MPC algorithm is used to control the performance of the PCC plant. Two techno-economic scenarios based on fixed (capture rate is constant and flexible (capture rate is variable operation modes are developed using actual electricity prices (2011 with fixed carbon prices ($AUD 5, 25, 50/tonne-CO2 for 24 h periods. Results show that fixed operation mode can bring about a ratio of net operating revenue deficit at an average of 6% against the superior flexible operation mode.

  20. Modeling Operating Modes during Plant Life Cycle

    DEFF Research Database (Denmark)

    Jørgensen, Sten Bay; Lind, Morten

    2012-01-01

    Modelling process plants during normal operation requires a set a basic assumptions to define the desired functionalities which lead to fullfillment of the operational goal(-s) for the plant. However during during start-up and shut down as well as during batch operation an ensemble of interrelated...... modes are required to cover the whole operational window of a processs plant including intermediary operating modes. Development of such an model ensemble for a plant would constitute a systematic way of defining the possible plant operating modes and thus provide a platform for also defining a set...... of candidate control structures. The present contribution focuses on development of a model ensemble for a plant with an illustartive example for a bioreactor. Starting from a functional model a process plant may be conceptually designed and qualitative operating models may be developed to cover the different...

  1. AECL's support to operating plants world wide

    International Nuclear Information System (INIS)

    Azeez, S.; Kakaria, B.K.; Hinchley, E.M.

    1998-01-01

    Through their operating records, CANDU reactors have established themselves as a successful and cost-effective source of electricity in Canada and abroad. They have proven to be safe, reliable and economical. A variety of factors have contributed to the enviable CANDU record, such as a sound design based on proven principles supported by effective development programs, along with dedicated plant owners committed to excellence in safely maintaining and operating their plants. Atomic Energy of Canada Limited (AECL), the CANDU designer, has continuously maintained a close relationship with owners/operators of the plants in Canada, Argentina, Romania and South Korea. AECL and the plant operators have all benefited from this strengthening relationship by sharing experience and information. CANDU plant operators have been required to respond decisively to the economic realities of downward cost pressures and deregulation. Operating, Maintenance and Administration (OM and A) costs are being given a new focus as plant owners review each cost element to improve the economic returns from their investments. Amongst the three main OM and A constituents, plant maintenance costs are the most variable and have the largest influence on effective plant operations. The correlation between effective plant maintenance and high capacity factors shows clearly the importance of proactive maintenance planning to reduce the frequency and duration of forced plant outages and their negative impacts on plant economics. This paper describes the management processes and organizational structures m AECL that support plant operations and maintenance in operating CANDU plants with cost effective products and services. (author)

  2. Supporting plant operation through computer-based procedures

    International Nuclear Information System (INIS)

    Martinez, Victor; Medrano, Javier; Mendez, Julio

    2014-01-01

    Digital Systems are becoming more important in controlling and monitoring nuclear power plant operations. The capabilities of these systems provide additional functions as well as support operators in making decisions and avoiding errors. Regarding Operation Support Systems, an important way of taking advantage of these features is using computer-based procedures (CBPs) tools that enhance the plant operation. Integrating digital systems in analogue controls at nuclear power plants in operation becomes an extra challenge, in contrast to the integration of Digital Control Systems in new nuclear power plants. Considering the potential advantages of using this technology, Tecnatom has designed and developed a CBP platform taking currently operating nuclear power plants as its design basis. The result is a powerful tool which combines the advantages of CBPs and the conventional analogue control systems minimizing negative effects during plant operation and integrating operation aid-systems to support operators. (authors)

  3. Risk averse optimal operation of a virtual power plant using two stage stochastic programming

    International Nuclear Information System (INIS)

    Tajeddini, Mohammad Amin; Rahimi-Kian, Ashkan; Soroudi, Alireza

    2014-01-01

    VPP (Virtual Power Plant) is defined as a cluster of energy conversion/storage units which are centrally operated in order to improve the technical and economic performance. This paper addresses the optimal operation of a VPP considering the risk factors affecting its daily operation profits. The optimal operation is modelled in both day ahead and balancing markets as a two-stage stochastic mixed integer linear programming in order to maximize a GenCo (generation companies) expected profit. Furthermore, the CVaR (Conditional Value at Risk) is used as a risk measure technique in order to control the risk of low profit scenarios. The uncertain parameters, including the PV power output, wind power output and day-ahead market prices are modelled through scenarios. The proposed model is successfully applied to a real case study to show its applicability and the results are presented and thoroughly discussed. - Highlights: • Virtual power plant modelling considering a set of energy generating and conversion units. • Uncertainty modelling using two stage stochastic programming technique. • Risk modelling using conditional value at risk. • Flexible operation of renewable energy resources. • Electricity price uncertainty in day ahead energy markets

  4. Manufacturers' support to plant operation

    International Nuclear Information System (INIS)

    Kuschel, D.

    1996-01-01

    For more than 30 years now, safety and availablity of German nuclear power plants has been a common interest of the plant owners and the manufacturing company KWU. This longstanding collaboration for a common goal has created a safety culture unprecented in other countries, and a partnership worth to be continued. Due to the nuclear power phaseout policy, the priority today is on maintaining and safeguarding economically efficient operation of existing power plants. KWU have been adapting their business strategy to the change in the market, and are prepared to stick to this line. Thus KWU and plant operators see to it that the acquired competence in nuclear power plant technology will remain to be concentrated in the hands of the manufacturers. Continuing the partnership in this field, and encouraged by the placement of orders for the future EPR and the SWR 1000, KWU and plant operators will be in the position to offer a sound option for future decisions about construction of new nuclear power plants in Germany. (orig.) [de

  5. Nuclear power plant operating experience, 1976

    International Nuclear Information System (INIS)

    1977-11-01

    This report is the third in a series of reports issued annually that summarize the operating experience of U.S. nuclear power plants in commercial operation. Power generation statistics, plant outages, reportable occurrences, fuel element performance, occupational radiation exposure and radioactive effluents for each plant are presented. Summary highlights of these areas are discussed. The report includes 1976 data from 55 plants--23 boiling water reactor plants and 32 pressurized water reactor plants

  6. Damped oscillatory integrals and boundedness problem for maximal operators

    International Nuclear Information System (INIS)

    Ikromov, Isroil A.

    2003-06-01

    We consider a real-analytic hypersurface S in IR n+1 with surface measure dσ, ψ is a compactly supported non-negative smooth cut-off function, and we let dμ q be the surface measure with dμ q ψvertical barΛ(X)vertical bar q dσ, where Λ(X) is a damping factor defined by the matrix of a second fundamental form of the surface. We show that if S is a real analytic hypersurface, then μ-circumflex q (ξ) decays as O(vertical barξvertical bar -(1/2+ε) ), where ε > 0, provided q > 3/2. We also consider applications involving maximal operators associated to averages of functions over hypersurfaces. (author)

  7. Operational characteristics of nuclear power plants - modelling of operational safety

    International Nuclear Information System (INIS)

    Studovic, M.

    1984-01-01

    By operational experience of nuclear power plants and realize dlevel of availability of plant, systems and componenst reliabiliuty, operational safety and public protection, as a source on nature of distrurbances in power plant systems and lessons drawn by the TMI-2, in th epaper are discussed: examination of design safety for ultimate ensuring of safe operational conditions of the nuclear power plant; significance of the adequate action for keeping proess parameters in prescribed limits and reactor cooling rquirements; developed systems for measurements detection and monitoring all critical parameters in the nuclear steam supply system; contents of theoretical investigation and mathematical modeling of the physical phenomena and process in nuclear power plant system and components as software, supporting for ensuring of operational safety and new access in staff education process; program and progress of the investigation of some physical phenomena and mathematical modeling of nuclear plant transients, prepared at faculty of mechanical Engineering in Belgrade. (author)

  8. Plant designer's view of the operator's role in nuclear plant safety

    International Nuclear Information System (INIS)

    Corcoran, W.R.; Church, J.F.; Cross, M.T.; Porter, N.J.

    1981-01-01

    The nuclear plant operator's role supports the design assumptions and equipment with four functional tasks. He must set up th plant for predictable response to disturbances, operate the plant so as to minimize the likelihood and severity of event initiators, assist in accomplishing the safety functions, and feed back operating experiences to reinforce or redefine the safety analyses' assumptions. The latter role enhances the operator effectiveness in the former three roles. The Safety Level Concept offers a different perspective that enables the operator to view his roles in nuclear plant safety. This paper outlines the operator's role in nuclear safety and classifies his tasks using the Safety Level Concept

  9. Intelligent operation system for nuclear power plants

    International Nuclear Information System (INIS)

    Morioka, Toshihiko; Fukumoto, Akira; Suto, Osamu; Naito, Norio.

    1987-01-01

    Nuclear power plants consist of many systems and are operated by skillful operators with plenty of knowledge and experience of nuclear plants. Recently, plant automation or computerized operator support systems have come to be utilized, but the synthetic judgment of plant operation and management remains as human roles. Toshiba is of the opinion that the activities (planning, operation and maintenance) should be integrated, and man-machine interface should be human-friendly. We have begun to develop the intelligent operation system aiming at reducing the operator's role within the fundamental judgment through the use of artificial intelligence. (author)

  10. The operation of nuclear power plants

    International Nuclear Information System (INIS)

    Brosche, D.

    1992-01-01

    The duties to be performed in managing the operation of a nuclear power plant are highly diverse, as will be explained in this contribution by the examples of the Grafenrheinfeld Nuclear Power Station. The excellent safety record and the high availabilities of German nuclear power plants demonstrate that their operators have adopted the right approaches. Systematic evaluation of the operating experience accumulated inhouse and in other plants is of great significance in removing weak spots and improving operation. The manifold and complex activities in the structure of organization and of activities in a nuclear power plant require a high degree of division of labor. (orig.) [de

  11. Operating the plant, quality assurance, and the job of the operating staff, Volume Twelve

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    Subject matter includes operating the plant (the role of the operator, the control room, plant technical specifications, plant operating procedures, initial startup program, BWR/PWR plant startup, BWR/PWR steady state power operation, BWR/PWR transient operation, emergency operation), quality assurance (what is quality, what is quality control, quality assurance includes quality control, government regulation and quality assurance, administrative controls for nuclear power plants, the necessity of reviews and audits, practical quality assurance), and the job of the operating staff (the plant operating staff, plant safety, first aid and resuscitation, general plant hazards, personnel protective equipment, handling chemicals, handling compressed gas, equipment repair and maintenance, communicating with others

  12. Thermal power plant design and operation

    CERN Document Server

    Sarkar, Dipak

    2015-01-01

    Thermal Power Plant: Design and Operation deals with various aspects of a thermal power plant, providing a new dimension to the subject, with focus on operating practices and troubleshooting, as well as technology and design. Its author has a 40-long association with thermal power plants in design as well as field engineering, sharing his experience with professional engineers under various training capacities, such as training programs for graduate engineers and operating personnel. Thermal Power Plant presents practical content on coal-, gas-, oil-, peat- and biomass-fueled thermal power

  13. Optimization of cascade hydropower system operation by genetic algorithm to maximize clean energy output

    Directory of Open Access Journals (Sweden)

    Aida Tayebiyan

    2016-06-01

    Full Text Available Background: Several reservoir systems have been constructed for hydropower generation around the world. Hydropower offers an economical source of electricity with reduce carbon emissions. Therefore, it is such a clean and renewable source of energy. Reservoirs that generate hydropower are typically operated with the goal of maximizing energy revenue. Yet, reservoir systems are inefficiently operated and manage according to policies determined at the construction time. It is worth noting that with little enhancement in operation of reservoir system, there could be an increase in efficiency of the scheme for many consumers. Methods: This research develops simulation-optimization models that reflect discrete hedging policy (DHP to manage and operate hydropower reservoir system and analyse it in both single and multireservoir system. Accordingly, three operational models (2 single reservoir systems and 1 multi-reservoir system were constructed and optimized by genetic algorithm (GA. Maximizing the total power generation in horizontal time is chosen as an objective function in order to improve the functional efficiency in hydropower production with consideration to operational and physical limitations. The constructed models, which is a cascade hydropower reservoirs system have been tested and evaluated in the Cameron Highland and Batang Padang in Malaysia. Results: According to the given results, usage of DHP for hydropower reservoir system operation could increase the power generation output to nearly 13% in the studied reservoir system compared to present operating policy (TNB operation. This substantial increase in power production will enhance economic development. Moreover, the given results of single and multi-reservoir systems affirmed that hedging policy could manage the single system much better than operation of the multi-reservoir system. Conclusion: It can be summarized that DHP is an efficient and feasible policy, which could be used

  14. Study of the zero modes of the Faddeev–Popov operator in the maximal Abelian gauge

    International Nuclear Information System (INIS)

    Capri, M.A.L.; Guimaraes, M.S.; Lemes, V.E.R.; Sorella, S.P.; Tedesco, D.G.

    2014-01-01

    A study of the zero modes of the Faddeev–Popov operator in the maximal Abelian gauge is presented in the case of the gauge group SU(2) and for different Euclidean space–time dimensions. Explicit examples of classes of normalizable zero modes and corresponding gauge field configurations are constructed by taking into account two boundary conditions, namely: (i) the finite Euclidean Yang–Mills action, (ii) the finite Hilbert norm. -- Highlights: •We study the zero modes of the Faddeev–Popov operator in the maximal Abelian gauge. •For d=2 we obtain solutions with finite action but not finite Hilbert norm. •For d=3,4 we obtain solutions with finite action and finite Hilbert norm. •These results can be compared with those previously obtained in the Landau gauge

  15. Training of power plant operating personnel

    International Nuclear Information System (INIS)

    Kraftwerksschule, E.V.

    1986-01-01

    In Germany, professional training of power plant operating personnel became an important issue in the fifties, when power plant parameters as well as complexity of instrumentation and control increased considerably. Working Groups of VGB Technische Vereiningung der Grosskraftwerketreiber e.v. (Association of Large Power Plant Operators) developed a professional career for power plant operating personnel and defined pre-requisites, scope and objectives of training. In 1957 the German utilities founded KRAFTWERKSSCHULE E.V. (kws) as a school for theoretical training and for guidance of practical training in the power plants. KWS is a non-profit organisation and independent of authorities. Today KWS has 127 members in Germany and in 6 other countries. The objectives of KWS include the training of: -Kraftwerker (control room operators; - Kraftwerksmesiter (shift supervisors); and - shift engineers; according the guidelines of the VGB

  16. Fatigue assessments in operating nuclear power plants

    International Nuclear Information System (INIS)

    Gosselin, S.R.; Deardorff, A.F.; Peltola, D.W.

    1994-01-01

    In November 1991, the ASME Section XI Task Group on Operating Plant Fatigue Assessment was formed to develop criteria and evaluation methodology for evaluating the effects of cyclic operation in operating nuclear power plants. The objective was to develop guidelines for inclusion in Section XI that could be used by plant operators in evaluating fatigue concerns and their impact on serviceability. This paper discusses the work performed by the Task Group. It explores the concept of ''Fatigue Design Basis'' versus ''Fatigue Operating Basis'' by examining the roles of ASME Section III and ASME Section XI in the design and operation of the nuclear power plants. Guidelines are summarized that may help plant operators perform effective design transient cycle evaluations and optimize cycle counting and fatigue usage tracking. The alternative fatigue evaluation approach using flaw tolerance is also introduced

  17. Operation and maintenance results from ISFOC CPV plants

    Science.gov (United States)

    Gil, Eduardo; Martinez, María; de la Rubia, Oscar

    2017-09-01

    The analysis of field operation and maintenance data collected during a period of over eight years, from CPV installations consisting of three different CPV technologies (including second generation of one of these technologies), has allowed us to get valuable information about the long-term degradation of the CPV systems. Through the study of the maintenance control ratio previously defined and by applying the root cause analysis methodology, the components responsible for the most unplanned interventions for each technology were identified. Focusing maintenance efforts on these components, a reduction of the unplanned interventions and the total cost of maintenance has been achieved over the years. Therefore, the deployment of an effective maintenance plan, identifying critical components, is essential to minimize the risk for investors and maximize the CPV power plants lifetime and energy output, increasing the availability of CPV installations, boosting market confidence in CPV systems.

  18. Technological evaluation for the extension of the operation license to the nuclear power plant of Laguna Verde

    International Nuclear Information System (INIS)

    Arganis J, C. R.; Medina A, A. L.

    2010-01-01

    At the present time one of the tendencies in the nuclear industry is the renovation of operation licenses of the nuclear power plants, with the purpose of prolonging their operation 20 years more than the time settled down in their original license, which is of 30 years for the case of the nuclear power plant of Laguna Verde. This allows the electric power generation for a major period of time and to a relatively low price, giving this way a bigger competitiveness to the power stations of nuclear power. However, to request the license extension of the nuclear power plant requires to get ready the documentation and necessary studies for: to maintain a high level of security, to optimize the operation, maintenance and service life of the structures, systems and components, to maintain an acceptable level of performance, to maximize the recovery of the investment about the service of the nuclear power plant and to preserve the sure conditions for a major operation period at the license time. This paper describes the studies conducted by the Materials Technology Department of the Instituto Nacional de Investigaciones Nucleares (ININ) to substantiate the required documentation for obtaining the extension of operating license of the nuclear power plant. These studies are focused mainly in the reactor pressure vessels of both units, as well as in the deposit of noble metals and the influence of the sludges (crud s) in this deposit. (Author)

  19. Development of JOYO Plant Operation Management Expert Tool (JOYPET)

    International Nuclear Information System (INIS)

    Michino, Masanobu; Terano, Toshihiro; Hanawa, Mikio; Aoki, Hiroshi; Okubo, Toshiyuki

    2000-03-01

    The Operation and Maintenance Support Systems for JOYO are being developed, with the aim of ensuring the stable and safe operation of JOYO and improving operational reliability of future FBR plants. Plant Operation Management Expert Tool named JOYPET had been developed as one of the Operation and Maintenance Support Systems, which helps plant operation management. The following functions were developed and applied. (1) Papers management (Plant status management) function for maintenance activities, (2) Isolation management support function for plant operation, (3) Automatically drawing function of plant operation schedule, (4) Isolation judgment function for plant operation. By use this system, the plant management of JOYO was able to improved reliability and reduced manpower. (author)

  20. Hybrid Multi-Objective Optimization of Folsom Reservoir Operation to Maximize Storage in Whole Watershed

    Science.gov (United States)

    Goharian, E.; Gailey, R.; Maples, S.; Azizipour, M.; Sandoval Solis, S.; Fogg, G. E.

    2017-12-01

    The drought incidents and growing water scarcity in California have a profound effect on human, agricultural, and environmental water needs. California experienced multi-year droughts, which have caused groundwater overdraft and dropping groundwater levels, and dwindling of major reservoirs. These concerns call for a stringent evaluation of future water resources sustainability and security in the state. To answer to this call, Sustainable Groundwater Management Act (SGMA) was passed in 2014 to promise a sustainable groundwater management in California by 2042. SGMA refers to managed aquifer recharge (MAR) as a key management option, especially in areas with high variation in water availability intra- and inter-annually, to secure the refill of underground water storage and return of groundwater quality to a desirable condition. The hybrid optimization of an integrated water resources system provides an opportunity to adapt surface reservoir operations for enhancement in groundwater recharge. Here, to re-operate Folsom Reservoir, objectives are maximizing the storage in the whole American-Cosumnes watershed and maximizing hydropower generation from Folsom Reservoir. While a linear programing (LP) module tends to maximize the total groundwater recharge by distributing and spreading water over suitable lands in basin, a genetic based algorithm, Non-dominated Sorting Genetic Algorithm II (NSGA-II), layer above it controls releases from the reservoir to secure the hydropower generation, carry-over storage in reservoir, available water for replenishment, and downstream water requirements. The preliminary results show additional releases from the reservoir for groundwater recharge during high flow seasons. Moreover, tradeoffs between the objectives describe that new operation performs satisfactorily to increase the storage in the basin, with nonsignificant effects on other objectives.

  1. Visualization study of operators' plant knowledge model

    International Nuclear Information System (INIS)

    Kanno, Tarou; Furuta, Kazuo; Yoshikawa, Shinji

    1999-03-01

    Nuclear plants are typically very complicated systems and are required extremely high level safety on the operations. Since it is never possible to include all the possible anomaly scenarios in education/training curriculum, plant knowledge formation is desired for operators to enable thein to act against unexpected anomalies based on knowledge base decision making. The authors have been conducted a study on operators' plant knowledge model for the purpose of supporting operators' effort in forming this kind of plant knowledge. In this report, an integrated plant knowledge model consisting of configuration space, causality space, goal space and status space is proposed. The authors examined appropriateness of this model and developed a prototype system to support knowledge formation by visualizing the operators' knowledge model and decision making process in knowledge-based actions with this model on a software system. Finally the feasibility of this prototype as a supportive method in operator education/training to enhance operators' ability in knowledge-based performance has been evaluated. (author)

  2. China’s Nuclear Power Plants in Operation

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    Qinshan Plant Phase I Located in Haiyan,Zhejiang Province,Qinshan Nuclear Power Plant Phase I is t he first 300-megawatt pressurized water reactor (PWR) nuclear power plant independently designed,constructed,operated and managed by China.The plant came into commercial operation in April 1994.

  3. Modifications at operating nuclear power plants

    International Nuclear Information System (INIS)

    Duffy, T.J.; Gazda, P.A.

    1985-01-01

    Modifications at operating nuclear power plants offer the structural engineer many challenges in the areas of scheduling of work, field adjustments, and engineering staff planning. The scheduling of structural modification work for operating nuclear power plants is normally closely tied to planned or unplanned outages of the plant. Coordination between the structural engineering effort, the operating plant staff, and the contractor who will be performing the modifications is essential to ensure that all work can be completed within the allotted time. Due to the inaccessibility of some areas in operating nuclear power plants or the short time available to perform the structural engineering in the case of an unscheduled outrage, field verification of a design is not always possible prior to initiating the construction of the modification. This requires the structural engineer to work closely with the contractor to promptly resolve problems due to unanticipated interferences or material procurement problems that may arise during the course of construction. The engineering staff planning for structural modifications at an operating nuclear power plant must be flexible enough to permit rapid response to the common ''fire drills,'' but controlled enough to ensure technically correct designs and to minimize the expenditure of man-hours and the resulting engineering cost

  4. Knowledge base for power plant operation and its application to operation guide

    International Nuclear Information System (INIS)

    Doi, Atsushi; Sakaguchi, Toshiaki

    1986-01-01

    The present study is aimed at constructing a knowledge base for supervisory control operation in power plants and developing an operation guidance by using it. Examination is made to provide dignosis procedures on the basis of an existing alarm system. An operation guidance procedure for diagnosis is proposed which is to be followed when several alarms are sounded simultaneously in a power plant, and application of the procedure to an existing plant is examined. The operation manual for the plant includes 75 description items for six alarms. It is shown that the number of items related to these alarms can be reduced by 70 % by rearranging them according to the procedure. Another investigation is conducted to provide an operation manual for diagnosis to be used when one alarm is sounded in a plant. The quality of the manual developed is on nearly the same level with that for the existing plant examined. When a knowledge base is to be constructed from an existing operation manual, the processing operation generally requires a certain level of linguistic comprehension ability, such as for judgment of synonyms. It is demonstrated that the procedure proposed here is able to develop a high-quality knowledge base with standardized terminology. The procedure can also serve to construct operation manuals for plants in other industrial fields. (Nogami, K.)

  5. Regulatory framework for nuclear power plant operation

    International Nuclear Information System (INIS)

    Perez Alcaniz, T.; Esteban Barriendos, M.

    1995-01-01

    As the framework of standards and requirements covering each phase of nuclear power plant project and operation developed, plant owners defined their licensing commitments (codes, rules and design requirements) during the project and construction phase before start-up and incorporated regulatory requirements imposed by the regulatory Body during the licensing process prior to operation. This produces a regulatory framework for operating a plant. It includes the Licensing Basis, which is the starting point for analyzing and incorporating new requirements, and for re-evaluation of existing ones. This presentation focuses on the problems of applying this regulatory framework to new operating activities, in particular to new projects, analyzing new requirements, and reconsidering existing ones. Clearly establishing a plant's licensing basis allows all organizations involved in plant operation to apply the requirements in a more rational way. (Author)

  6. Improving operator quality at Genkai Nuclear Power Plant

    International Nuclear Information System (INIS)

    Kuwano, Takeshi.

    1989-01-01

    Improvement in operator quality, or improvement in an operator's skill and professional knowledge, is of prime importance because of its great influence on safe and steady plant operation. This paper describes the education and training of reactor operators at the Genkai pressurized water reactor nuclear power plant with respect to the following topics: organization of Genkai power plant; education and training program management; training at the Nuclear Training Center; training and education on-site including emergency procedures training, normal operating procedures training, informational study of emergency conditions in existing plants, and all-around training of operators; qualifying tests for supervisors; and operator motivation

  7. Industrial Fuel Gas Demonstration Plant Program. Demonstration plant operation plan (Deliverable No. 38)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    The Demo Plant Operating Plan is composed of the following sequence of events starting with the training or personnel, familiarizing of the personnel with the plant and completing the long-term run in the following sequences: inspection during construction, plant completion, shakedown of equipment, process unit startup, shakedown of process units, variable run operation and a turnaround. During the construction period, technical personnel from DRC, MLGW and IGT will be at the plant site becoming familiar with the equipment, its installation and all of the auxiliaries so that on completion of construction they will be well grounded on the plant detail and its configuration. At the same time the supervisory operating personnel will have hands on training the gasifier operation at the IGT pilot plant to develop a field for gasifier operation. As a plant sections are completed, they will be checked out in accordance with the contractor and operator (client) procedure as outlined. Subsequent to this, various vendor designs and furnished equipment will be checked out operating-wise and a performance test run if feasible. The actual startup of the plant will be subsequential with the support areas as utilities, coal handling and waste treatment being placed in operation first. Subsequent to this the process units will be placed in operation starting from the rear of the process train and working forward. Thus the downstream units will be operating before the reactor is run on coal. The reactor will be checked out on coke operation.

  8. Automation system for operation of nuclear power plant

    International Nuclear Information System (INIS)

    Kinoshita, Mitsuo; Fukuzaki, Koji; Kato, Kanji

    1991-01-01

    The automation system comprises a general monitor control device incorporating a plurality of emergency operation plannings concerning an automatic processing, and judging whether the operation is to be conducted or not depending on the plannings based on the data planed by a plant, a control device for controlling the plant in accordance with the planning when monitor control device judges that the operation should be done due to the emergency operation plannings and an operation planning device aiding the formation of the operation plannings. When the state of the power plant exceeds a normal control region, the reactor power is lowered automatically by so much as a predetermined value or to a predetermined level, to automatically return the plant state to the normal control region. In this way, the plant operation efficiency can be improved. Further, after automatic operation, since operation plannings for recovering original operation plannings are prepared efficiently and recovered operation plannings are started in a short period of time, the operators' burden can be mitigated and power saving can be attained. (N.H.)

  9. Operating plant safety analysis needs

    International Nuclear Information System (INIS)

    Young, M.Y.; Love, D.S.

    1992-01-01

    The primary objective for nuclear power station owners is to operate and manage their plants safely. However, there is also a need to provide economical electric power, which requires that the unit be operated as efficiently as possible, consistent with the safety requirements. The objectives cited above can be achieved through the identification and use of available margins inherent in the plant design. As a result of conservative licensing and analytical approaches taken in the past, many of these margins may be found in the safety analysis limits within which plants currently operate. Improvements in the accuracy of the safety analysis, and a more realistic treatment of plant initial and boundary conditions, can make this margin available for a variety of uses which enhance plant performance, help to reduce O and M costs, and may help to extend licensed operation. Opportunities for improvement exist in several areas in the accident analysis normally performed for Chapter 15 of the FSAR. For example, recent modifications to the ECCS rule, 10CFR50.46 and Appendix K, allow use of margins previously unavailable in the analysis of the Loss of Coolant Accident (LOCA). To take advantage of this regulatory change, new methods are being developed to analyze both the large and small break loss of coolant accident (LOCA). As this margin is used, enhancements in the analysis of other transients will become necessary. The paper discusses accident analysis methods, future development needs, and analysis margin utilization in specific accident scenarios

  10. Plant regeneration from protoplasts of Gentiana straminea Maxim

    Directory of Open Access Journals (Sweden)

    Shi Guomin

    2016-01-01

    Full Text Available A protocol is described for plant regeneration from protoplasts of Gentiana straminea Maxim. via somatic embryogenesis. Protoplasts were isolated from embryogenic calli in an enzyme solution composed of 2% Cellulase Onozuka R-10, 0.5% Macerozyme R-10, 0.5% Hemicellulase, and 0.5 M sorbitol with a yield of 3.0 × 106 protoplasts per gram of fresh weight. Liquid, solid-liquid double layer (sLD and agar-pool (aPL culture systems were used for protoplast culture. The aPL culture was the only method that produced embryogenic, regenerative calli. With aPL culture, the highest frequencies of protoplast cell division and colony formation were 39.6% and 16.9%, respectively, on MS medium supplemented with 2 mg/L 2,4-dichlorophenoxyacetic acid (2,4-D and 0.5 mg/L N6-benzylaminopurine (BA. Microcalli were transferred to solid MS medium containing a reduced concentration of 2,4-D (0.5 mg/L to promote the formation of embryogenic calli. Somatic embryos developed into plantlets on MS medium supplemented with 2 mg/L BA at a rate of 43.7%.

  11. Nuclear power plant operational data compilation system

    International Nuclear Information System (INIS)

    Silberberg, S.

    1980-01-01

    Electricite de France R and D Division has set up a nuclear power plant operational data compilation system. This data bank, created through American documents allows results about plant operation and operational material behaviour to be given. At present, French units at commercial operation are taken into account. Results obtained after five years of data bank operation are given. (author)

  12. Knowledge representation for integrated plant operation and maintenance

    DEFF Research Database (Denmark)

    Lind, Morten

    2010-01-01

    Integrated operation and maintenance of process plants has many advantages. One advantage is the improved economy obtained by reducing the number of plant shutdowns. Another is to increase reliability of operation by monitoring of risk levels during on-line maintenance. Integrated plant operation...... and maintenance require knowledge bases which can capture the interactions between the two plant activities. As an example, taking out a component or a subsystem for maintenance during operation will require a knowledge base representing the interactions between plant structure, functions, operating states...... and goals and incorporate knowledge about redundancy and reliability data. Multilevel Flow Modeling can be used build knowledge bases representing plant goals and functions and has been applied for fault diagnosis and supervisory control but currently it does not take into account structural information...

  13. Psychological characteristics of licensed nuclear power plant operators

    International Nuclear Information System (INIS)

    Sajwaj, T.; Ford, T.; McGee, R.K.

    1987-01-01

    The safe production of electricity by nuclear power plants has been the focus of considerable attention. Much of this concern has been focused on equipment and procedural issues, with less attention to the psychological factors that affect the operations staff of the plants, i.e., those individuals who are most directly responsible for a plant's operations. Stress and type A qualities would be significant for these individuals because of their relationships to job performance and health. Of equal significance would be work-related factors, such as job involvement and work pressure. Also of interest would be hostile tendencies because of the need for cooperation and communications among operations staff. Two variables could influence these psychological factors. One is the degree of responsibility for a plant's nuclear reactors. The individuals with the greatest responsibility are licensed by the US Nuclear Regulatory Commission (NRC). There are also individuals with less direct responsibilities who are not licensed. A second variable is the operating status of the plant, whether or not the plant is currently producing electricity. Relative to ensuring the safe operation of nuclear power plants, these data suggest a positive view of licensed operators. Of interest are the greater stress scores in the licensed staff of the operating plant in contrast with their peers in the nonoperating plant

  14. Virtual power plant mid-term dispatch optimization

    International Nuclear Information System (INIS)

    Pandžić, Hrvoje; Kuzle, Igor; Capuder, Tomislav

    2013-01-01

    Highlights: ► Mid-term virtual power plant dispatching. ► Linear modeling. ► Mixed-integer linear programming applied to mid-term dispatch scheduling. ► Operation profit maximization combining bilateral contracts and the day-ahead market. -- Abstract: Wind power plants incur practically zero marginal costs during their operation. However, variable and uncertain nature of wind results in significant problems when trying to satisfy the contracted quantities of delivered electricity. For this reason, wind power plants and other non-dispatchable power sources are combined with dispatchable power sources forming a virtual power plant. This paper considers a weekly self-scheduling of a virtual power plant composed of intermittent renewable sources, storage system and a conventional power plant. On the one hand, the virtual power plant needs to fulfill its long-term bilateral contracts, while, on the other hand, it acts in the market trying to maximize its overall profit. The optimal dispatch problem is formulated as a mixed-integer linear programming model which maximizes the weekly virtual power plant profit subject to the long-term bilateral contracts and technical constraints. The self-scheduling procedure is based on stochastic programming. The uncertainty of the wind power and solar power generation is settled by using pumped hydro storage in order to provide flexible operation, as well as by having a conventional power plant as a backup. The efficiency of the proposed model is rendered through a realistic case study and analysis of the results is provided. Additionally, the impact of different storage capacities and turbine/pump capacities of pumped storage are analyzed.

  15. Plant operation state monitoring system

    International Nuclear Information System (INIS)

    Sakai, Masanori; Babuchi, Katsumi; Arato, Toshiaki

    1994-01-01

    The system of the present invention accurately monitors a plant operation state of a plant, such as a nuclear power plant and a thermal power plant by using high temperature water, based on water quality informations. That is, water quality informations for the objective portion by using an electrochemical water quality sensor disposed in the objective portion to be monitored in the plant are continuously extracted for a predetermined period of time. Water quality is evaluated based on the extracted information. Obtained results for water quality evaluation and predetermined reference values of the plant operation handling are compared. Necessary part among the results of the measurement is displayed or recorded. The predetermined period of time described above is a period that the water quality information reaches at least a predetermined value or a period that the predetermined value is estimated by the water quality information, and it is defined as a period capable of measuring the information for three months continuously. The measurement is preferably conducted continuously in a period up to each periodical inspection on about every one year. (I.S.)

  16. The critical safety functions and plant operation

    International Nuclear Information System (INIS)

    Corcoran, W.R.; Church, J.F.; Cross, M.T.; Guinn, W.M.; Porter, N.J.

    1981-01-01

    The operator's role in nuclear safety is outlined and the concept of ''safety functions'' introduced. Safety functions are a group of actions that prevent core melt or minimize radiation releases to the general public. They can be used to provide a hierarchy of practical plant protection that an operator should use. The plant safety evaluation uses four inputs in predicting the results of an event: the event initiator, the plant design, the initial plant conditions and setup, and the operator actions. If any of these inputs are not as assumed in the evaluation, confidence that the consequences will be as predicted is reduced. Based on the safety evaluation, the operator has three roles in assuring that the consequences of an event will be no worse than the predicted acceptable results: Maintain plant setup in readiness to properly respond. Operate the plant in a manner such that fewer, milder events minimize the frequency and the severity of adverse events. Monitor the plant to verify that the safety functions are accomplished. The operator needs a systematic approach to mitigating the consequences of an event. The concept of safety functions introduces this systematic approach and presents a hierarchy of protection. If the operator has difficulty identifying an event for any reason, the systematic safety function approach allows accomplishing the overall path of mitigating consequences. Ten functions designed to protect against core melt, preserve containment integrity, prevent indirect release of radioactivity, and maintain vital auxiliaries needed to support the other safety functions are identified

  17. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Lehtinen, Pekka

    1987-05-01

    These general reviews of the operation of the Finnish nuclear power plants concentrate on such events and discoveries related to reactor and radiation safety that the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the perssonnel or the environment. For remedying certain defects found in the administrative procedures concerning plant operation and maintenance, the Loviisa power plant was shut down for several days

  18. CANDU 9 operator plant display system

    International Nuclear Information System (INIS)

    Trueman, R.; Webster, A.; MacBeth, M.J.

    1997-01-01

    To meet evolving client and regulatory needs, AECL has adopted an evolutionary approach to the design of the CANDU 9 control centre. That is, the design incorporates feedback from existing stations, reflects the growing diversity in the roles and responsibilities of the operating staff, and reduces costs associated with plant capital and operations, maintenance and administration (OM and A), through the appropriate introduction of new technologies. Underlying this approach is a refined engineering design process that cost-effectively integrates operational feedback and human factors engineering to define the operating staff information and information presentation requirements. Based on this approach, the CANDU 9 control centre will provide utility operating staff with the means to achieve improved operations and reduced OM and A costs. One of the design features that will contribute to the improved operational capabilities of the control centre is a new Plant Display System (PDS) that is separate from the digital control system. The PDS will be used to implement non-safety panel, and console video display systems within the CANDU 9 main control room (MCR). This paper presents a detailed description of the CANDU 9 Plant Display System and features that provide increased operational capabilities. (author)

  19. Integrated approach to optimize operation and maintenance costs for operating nuclear power plants

    International Nuclear Information System (INIS)

    2006-06-01

    In the context of increasingly open electricity markets and the 'unbundling' of generating companies from former utility monopolies, an area of major concern is the economic performance of the existing fleet of nuclear power plants. Nuclear power, inevitably, must compete directly with other electricity generation sources. Coping with this competitive pressure is a challenge that the nuclear industry should meet if the nuclear option is to remain a viable one. This competitive environment has significant implications for nuclear plant operations, including, among others, the need for the more cost effective management of plant activities, and the greater use of analytical tools to balance the costs and benefits of proposed activities, in order to optimize operation and maintenance costs, and thus insure the economic competitiveness of existing nuclear power plants. In the framework of the activities on Nuclear Economic Performance Information System (NEPIS), the IAEA embarked in developing guidance on optimization of operation and maintenance costs for nuclear power plants. The report was prepared building on the fundamental that optimization of operation and maintenance costs of a nuclear power plant is a key component of a broader integrated business strategic planning process, having as overall result achievement of organization's business objectives. It provides advice on optimization of O and M costs in the framework of strategic business planning, with additional details on operational planning and controlling. This TECDOC was elaborated in 2004-2005 in the framework of the IAEA's programme on Nuclear Power Plant Operating Performance and Life Cycle Management, with the support of two consultants meetings and one technical meeting and based on contributions provided by participants. It can serve as a useful reference for the management and operation staff within utilities, nuclear power plant operators and regulators and other organizations involved in

  20. Artificial intelligence aid to efficient plant operations

    International Nuclear Information System (INIS)

    Wildberger, A.M.; Pack, R.W.

    1987-01-01

    As the nuclear power industry matures, it is becoming more and more important that plants be operated in an efficient, cost-effective manner, without, of course, any decrease in the essential margins of safety. Indeed, most opportunities for improved efficiency have little or no relation to nuclear safety, but are based on trade-offs among operator controllable parameters both within and external to the reactor itself. While these trade-offs are describable in terms of basic physical theory, thermodynamics, and the mathematics of control systems, their actual application is highly plant specific and influenced even by the day-to-day condition of the various plant components. This paper proposes the use of artificial intelligence techniques to construct a computer-based expert assistant to the plant operator for the purpose of aiding him in improving the efficiency of plant operation on a routine basis. The proposed system, which only advises the human operator, seems more amenable to the current regulatory approach than a truly automated control system even if the latter provides for manual override

  1. Decommissioning of nuclear reprocessing plants French past experience and approach to future large scale operations

    International Nuclear Information System (INIS)

    Jean Jacques, M.; Maurel, J.J.; Maillet, J.

    1994-01-01

    Over the years, France has built up significant experience in dismantling nuclear fuel reprocessing facilities or various types of units representative of a modern reprocessing plant. However, only small or medium scale operations have been carried out so far. To prepare the future decommissioning of large size industrial facilities such as UP1 (Marcoule) and UP2 (La Hague), new technologies must be developed to maximize waste recycling and optimize direct operations by operators, taking the integrated dose and cost aspects into account. The decommissioning and dismantling methodology comprises: a preparation phase for inventory, choice and installation of tools and arrangement of working areas, a dismantling phase with decontamination, and a final contamination control phase. Detailed description of dismantling operations of the MA Pu finishing facility (La Hague) and of the RM2 radio metallurgical laboratory (CEA-Fontenay-aux-Roses) are given as examples. (J.S.). 3 tabs

  2. Development of JOYO plant operation management expert tool

    Energy Technology Data Exchange (ETDEWEB)

    Michino, Masanobu; Sawada, Makoto [Power Reactor and Nuclear Fuel Development Corp., Oarai, Ibaraki (Japan). Oarai Engineering Center

    1995-03-01

    Operation and maintenance support systems for JOYO are being developed in order to keep the stable and safe operation of JOYO and to improve operational reliability of future FBR plants. As one of the systems, an operation support system named JOYPET has been developing and applied. The system supports the plant management works of JOYO which are necessary for much manpower and knowledge of the plant. The plant management of JOYO was able to improve its reliability and reduce manpower by using this system. As a final step, a judgment function based on the accumulated plant management rule of JOYO will be developed and applied. The function judges the plant condition which allows to start the maintenance works or not. (author).

  3. Operation and maintenance in Genkai PWR Plant

    International Nuclear Information System (INIS)

    Ohta, Shojiro

    1984-01-01

    The No.1 PWR plant with 559 MW capacity in the Genkai Nuclear Power Station, Kyushu Electric Power Co., Inc., required about 115 days for the regular inspection in fiscal 1982 and thereafter, although more maintenance work was done. But No.2 plant of the same type required not more than 80 days. In most cases, the period of one operation cycle was from 10 to 12 months, but in the third operation cycle of No.2 plant, it is expected to be 13 months. The capacity ratio of the whole power station was 75.2% at the end of fiscal 1983. These operational records all exceeded the Japanese average. The plants are two-loop Westinghouse type PWRs, and No.1 plant started the commercial operation of anti h and the increment of P 0 + . (author) apacity ratio of No.1 plant was 71.6%, and that of No.2 plant was 85.5%. The intergranular attack on steam generator tubes was found first in the fifth regular inspection, and also in the sixth and seventh inspections, and the faulty tubes were plugged. The prevention of its spread is the largest problem. The in-service quality assurance activity, the personnel training program and the effort of upgrading the plant availability are reported. (Kako, I.)

  4. Computer aids for plant operators

    International Nuclear Information System (INIS)

    Joly, J.P.

    1992-01-01

    For some time, particularly since the TMI accident, nuclear power plant operators have been aware of the difficulties involved in diagnosing accidents and returning plants to their stable, safe operating mode. There are various possible solutions to these problems: improve control organization during accident situations, rewrite control procedures, integrate safety engineers in shifts, improve control rooms, and implement additional computer aids. The purpose of this presentation is to describe the efforts undertaken by EDF over the last few years in this field

  5. Prototype equipment status monitor for plant operational configuration management

    International Nuclear Information System (INIS)

    DeVerno, M.; Trask, D.; Groom, S.

    1998-01-01

    CANDU plants, such as the Point Lepreau GS, have tens of thousands of operable devices. The status of each operable device must be immediately available to plan and execute future changes to the plant. Historically, changes to the plant's operational configuration have been controlled using manual and administrative methods where the status of each operable device is maintained on operational flowsheets located in the work control area of the main control room. The operational flowsheets are used to plan and develop Operating Orders (OOs) or Order-to-Operate (OTOs) and the control centre work processes are used to manage their execution. After performing each OO procedure, the operational flowsheets are updated to reflect the new plant configuration. This process can be very time consuming, and due to the manual processes, can lead to the potential for time lags and errors in the recording of the current plant configuration. Through a cooperative research and development program, Canadian CANDU utilities and Atomic Energy of Canada Limited, the design organization, have applied modern information technologies to develop a prototype Equipment Status Monitor (ESM) to address processes and information flow for efficient operational configuration management. The ESM integrates electronic operational flowsheets, equipment databases, engineering and work management systems, and computerized procedures to assess, plan, execute, track, and record changes to the plant's operational configuration. This directly leads to improved change control, more timely and accurate plant status information, fewer errors, and better decision making regarding future changes. These improvements to managing the plant's operational configuration are essential to increasing plant safety, achieving a high plant availability, and maintaining high capability and capacity factors. (author)

  6. Sequential Design of Experiments to Maximize Learning from Carbon Capture Pilot Plant Testing

    Energy Technology Data Exchange (ETDEWEB)

    Soepyan, Frits B.; Morgan, Joshua C.; Omell, Benjamin P.; Zamarripa-Perez, Miguel A.; Matuszewski, Michael S.; Miller, David C.

    2018-02-06

    Pilot plant test campaigns can be expensive and time-consuming. Therefore, it is of interest to maximize the amount of learning and the efficiency of the test campaign given the limited number of experiments that can be conducted. This work investigates the use of sequential design of experiments (SDOE) to overcome these challenges by demonstrating its usefulness for a recent solvent-based CO2 capture plant test campaign. Unlike traditional design of experiments methods, SDOE regularly uses information from ongoing experiments to determine the optimum locations in the design space for subsequent runs within the same experiment. However, there are challenges that need to be addressed, including reducing the high computational burden to efficiently update the model, and the need to incorporate the methodology into a computational tool. We address these challenges by applying SDOE in combination with a software tool, the Framework for Optimization, Quantification of Uncertainty and Surrogates (FOQUS) (Miller et al., 2014a, 2016, 2017). The results of applying SDOE on a pilot plant test campaign for CO2 capture suggests that relative to traditional design of experiments methods, SDOE can more effectively reduce the uncertainty of the model, thus decreasing technical risk. Future work includes integrating SDOE into FOQUS and using SDOE to support additional large-scale pilot plant test campaigns.

  7. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Lehtinen, Pekka

    1987-07-01

    These general reviews of the operation of the Finnish nuclear power plants concentrate on such events and discoveries related to reactor and radiation safety that the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. No event in the report period, or in the whole year of 1986, essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment. For remedying certain defects found in the adminstrative procedures concerning plant operation and maintenance, the Loviisa power plant was shut down for several days in September

  8. Modeling Operating Modes for the Monju Nuclear Power Plant

    DEFF Research Database (Denmark)

    Lind, Morten; Yoshikawa, Hidekazu; Jørgensen, Sten Bay

    2012-01-01

    The specification of supervision and control tasks in complex processes requires definition of plant states on various levels of abstraction related to plant operation in start-up, normal operation and shut-down. Modes of plant operation are often specified in relation to a plant decomposition in...... for the Japanese fast breeder reactor plant MONJU....

  9. Preparation and practice for nuclear power plant operation

    International Nuclear Information System (INIS)

    Wu Xuesong; Lu Tiezhong

    2015-01-01

    The operational preparation of the nuclear power plant is an important work in nuclear power plant production preparation. Due to the construction period of nuclear power plant from starting construction to production is as long as five years, the professional requirements of nuclear power operation are very strict, and the requirements for nuclear safety are also extremely high. Especially after the Fukushima accident, higher requirements for the safe operation of nuclear power plant are posed by competent authorities of the national level, regulatory authorities and each nuclear power groups. Based on the characteristics of the construction phase of nuclear power plant and in combination with engineering practice, this paper expounds the system established in the field of nuclear power plant operation and generally analyses the related management innovation. (authors)

  10. Permanent cessation of Tokai power plant's operation

    International Nuclear Information System (INIS)

    Satoh, T.

    1998-01-01

    Tokai power plant (166MWe, Magnox type: GCR) is the first commercial reactor in Japan and has been kept operating stable since its commissioning in July 1996. During this period it has produced electricity of approximately 27.7 billion KWh (as of March 1997) and its stable operation has contributed greatly to the stable supply of electricity in Japan. Furthermore, technologies in various fields have been developed, demonstrated and accumulated through the construction and operation of Tokai power plant. It also contributes to training for many nuclear engineers, and constructions and operations of nuclear power stations by other Japanese power companies. As a pioneer, it has been achieved to develop and popularize Japanese nuclear power generation. On the other hand, Tokai power plant has small capacity in its electric power output, even though the size of the reactor and heat exchangers are rather bigger than those of LWR due to the characteristics of GCR. Therefore, the generation cost is higher than the LWR. Since there is no plant whose reactor type is the same as that of Tokai power plant, the costs for maintenance and fuel cycle are relatively higher than that of LWR. Finally we concluded that the longer we operate it, the less we can take advantage of it economically. As a result of the evaluation for the future operation of Tokai power plant including the current status for supply of electricity by the Japanese utilities and study of decommissioning by Japanese government, we decided to have a plan of stopping its commercial operation of Tokai power plant in the end of March, 1998, when we completely consume its fuel that we possess. From now on, we set about performing necessary studies and researches on the field of plant characterization, remote-cutting, waste disposal for carrying out the decommissioning of Tokai power plant safely and economically. We are going to prepare the decommissioning planning for Tokai power plant in a few years based on the

  11. Operator training simulator for nuclear power plant

    International Nuclear Information System (INIS)

    Shiozuka, Hiromi

    1977-01-01

    In nuclear power plants, training of the operators is important. In Japan, presently there are two training centers, one is BWR operation training center at Okuma-cho, Fukushima Prefecture, and another the nuclear power generation training center in Tsuruga City, Fukui Prefecture, where the operators of PWR nuclear power plants are trained. This report describes the BWR operation training center briefly. Operation of a nuclear power plant is divided into three stages of start-up, steady state operation, and shut down. Start-up is divided into the cold-state start-up after the shut down for prolonged period due to periodical inspection or others and the hot-state start-up from stand-by condition after the shut down for a short time. In the cold-state start-up, the correction of reactivity change and the heating-up control to avoid excessive thermal stress to the primary system components are important. The BWR operation training center offers the next three courses, namely beginner's course, retraining course and specific training course. The training period is 12 weeks and the number of trainees is eight/course in the beginner's course. The simulator was manufactured by modeling No. 3 plant of Fukushima First Nuclear Power Station, Tokyo Electric Power Co. The simulator is composed of the mimic central control panel and the digital computer. The software system comprises the monitor to supervise the whole program execution, the logic model simulating the plant interlock system and the dynamic model simulating the plant physical phenomena. (Wakatsuki, Y.)

  12. Academic training for nuclear power plant operators

    International Nuclear Information System (INIS)

    Jones, D.W.

    1982-01-01

    In view of the increasing emphasis being placed upon academic training of nuclear power plant operators, it is important that institutions of higher education develop and implement programs which will meet the educational needs of operational personnel in the nuclear industry. Two primary objectives must be satisfied by these programs if they are to be effective in meeting the needs of the industry. One objective is for academic quality. The other primary objective is for programs to address the specialized needs of the nuclear plant operator and to be relevant to the operator's job. The Center for Nuclear Studies at Memphis State University, therefore, has developed a total program for these objectives, which delivers the programs, and/or appropriate parts thereto, at ten nuclear plant sites and with other plants in the planning stage. The Center for Nuclear Studies program leads to a Bachelor of Professional Studies degree in nuclear industrial operations, which is offered through the university college of Memphis State University

  13. Operation and maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Ackermann, G.

    1987-01-01

    This textbook gives a systematic introduction into the operational and maintenance activities in nuclear power plants with pressurized water reactors. Subjects: (1) Setup and operational behaviour of power reactors, (2) setup of nuclear power plants, (3) radiation protection and nuclear safety, (4) nuclear fuel, (5) constructional layout of nuclear power plants, (6) management, and (7) maintenance. 158 figs., 56 tabs

  14. Bidding strategy for pumped-storage plant in pool-based electricity market

    International Nuclear Information System (INIS)

    Kanakasabapathy, P.; Shanti Swarup, K.

    2010-01-01

    This paper develops optimal bidding strategies for a pumped-storage plant in a pool-based electricity market. In the competitive regime, when compared to simple hydroelectric generator, profit of the pumped-storage plant is maximized by operating it as a generator when market clearing price is high and as a pump when the price is low. Based on forecasted hourly market clearing price, a multistage looping algorithm to maximize the profit of a pumped-storage plant is developed, considering both the spinning and non-spinning reserve bids and meeting the technical operating constraints of the plant. The proposed model is adaptive for the nonlinear three-dimensional relationship between the power produced, the energy stored, and the head of the associated reservoir. Different operating cycles for a realistic pumped-storage plant are considered and simulation results are reported and compared. (author)

  15. Operating experience with nuclear power plants 2015. Pt. 1

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2016-07-01

    The VGB Technical Committee ''Nuclear Plant Operation'' has been exchanging operating experience about nuclear power plants for more than 30 years. Plant operators from several European countries are participating in the exchange. A report is given on the operating results achieved in 2015, events important to plant safety, special and relevant repair, and retrofit measures from Germany. The second part of this report will focus on nuclear power plant in Belgium, Finland, the Netherlands, Switzerland, and Spain.

  16. Load-following operation of PWR plants

    Energy Technology Data Exchange (ETDEWEB)

    Jang, Jong Hwa; Oh, Soo Yul; Koo, Yang Hyun; Lee, Jae Han [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-12-01

    The load-following operation of nuclear power plants will become inevitable due to the increased nuclear share in the total electricity generation. As a groundwork for the load-following capability of the Korean next generation PWRs, the state-of-the-art has been reviewed. The core control principles and methods are the main subject in this review as well as the impact of load-following operations on the fuel performance and on the mechanical integrity of components. To begin with, it was described what the load-following operation is and in what view point the technology should be reviewed. Afterwards the load-following method, performance and problems in domestic 900 MWe class PWRs were discussed, and domestic R and D works were summarized. Foreign technologies were also reviewed. They include Mode G and Mode X of Foratom, D and L bank method of KWU, the method using PSCEA of ABB-CE, and MSHIM of Westinghouse. The load-following related special features of Foratom`s N4 plant, KWU`s plants, ABB-CE`s Systems 80+, and Westinghouse`s AP600 were described in each technology review. The review concluded that the capability of N4 plant with Mode X is the best and the methods in System, 80+ and AP600 would require verifications for the continued and usual load-following operation. It was recommended that the load-following operation experiences in domestic PWRs under operation be required to settle down the capability for the future. In addition, a more enhanced technology is required for the Korean next generation PWR regardless what the reference plant concept is. 30 figs., 19 tabs., 75 refs. (Author).

  17. Safety of Nuclear Power Plants: Commissioning and Operation

    International Nuclear Information System (INIS)

    2011-01-01

    This publication is a revision of Safety Requirements No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe operation of nuclear power plants. Over recent years there have been developments in areas such as long term operation, plant ageing, periodic safety review, probabilistic safety analysis and risk informed decision making processes. It became necessary to revise the IAEA's safety requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the Fundamental Safety Principles. Contents: 1. Introduction; 2. Safety objectives and principles; 3. The management and organizational structure of the operating organization; 4. Management of operational safety; 5. Operational safety programmes; 6. Plant commissioning; 7. Plant operations; 8. Maintenance, testing, surveillance and inspection; 9. Preparation for decommissioning.

  18. Operator support system for nuclear power plants

    International Nuclear Information System (INIS)

    Mori, Nobuyuki; Tai, Ichiro; Sudo, Osamu; Naito, Norio.

    1987-01-01

    The nuclear power generation in Japan maintains the high capacity factor, and its proportion taken in the total generated electric power exceeded 1/4, thus it has become the indispensable energy source. Recently moreover, the nuclear power plants which are harmonious with operators and easy to operate are demanded. For realizing this, the technical development such as the heightening of operation watching performance, the adoption of automation, and the improvement of various man-machine systems for reducing the burden of operators has been advanced by utilizing electronic techniques. In this paper, the trend of the man-machine systems in nuclear power plants, the positioning of operation support system, the support in the aspects of information, action and knowledge, the example of a new central control board, the operation support system using a computer, an operation support expert system and the problems hereafter are described. As the development of the man-machine system in nuclear power plants, the upgrading from a present new central control board system PODIA through A-PODIA, in which the operational function to deal with various phenomena arising in plants and safety control function are added, to 1-PODIA, in which knowledge engineering technology is adopted, is expected. (Kako, I.)

  19. Computing and cognition in future power plant operations

    International Nuclear Information System (INIS)

    Kisner, R.A.; Sheridan, T.B.

    1983-01-01

    The intent of this paper is to speculate on the nature of future interactions between people and computers in the operation of power plants. In particular, the authors offer a taxonomy for examining the differing functions of operators in interacting with the plant and its computers, and the differing functions of the computers in interacting with the plant and its operators

  20. Computing and cognition in future power-plant operations

    International Nuclear Information System (INIS)

    Kisner, R.A.; Sheridan, T.B.

    1983-01-01

    The intent of this paper is to speculate on the nature of future interactions between people and computers in the operation of power plants. In particular, the authors offer a taxonomy for examining the differing functions of operators in interacting with the plant and its computers, and the differing functions of the computers in interacting with the plant and its operators

  1. Plant life management for long term operation of nuclear power plants

    International Nuclear Information System (INIS)

    2005-01-01

    The world's fleet of Nuclear Power Plants (NPPs) is approximately 20 years old on average, and most plants are believed to be able to operate for 60 years or more. The design life of a NPP is typically 30 to 40 years. This may be extended by 10 to 20 years, or more, provided that the plant can demonstrate by analysis, trending, equipment and system upgrades, increased vigilance, testing, ageing management, and other means that license renewal presents no threat to public health and safety. The basic goal of Plant Life Management (PLiM) is to satisfy requirements for safe long-term supplies of electricity in an economically competitive way. The basic goal of the operating company and the owners to operate as long as economically reasonable and possible from safety point of view. PLiM is a management tool for doing that. PLiM is a system of programmes and procedures to satisfy safety requirements for safe operation and for power production in a competitive way and for time which is rational from technical and economical point of view. PLiM is not only a technical system, it is also an attitude of the operational company to keep the plant in operation as long as possible from safety and business point of view. The common objectives of PLiM assessment is to help and review the pre-conditions for PLiM and long-term operation approaches. PLiM should not be associated with extension of operational life-time of the NPP only. It is an owner's attitude and rational approach of the operating company to run the business economically and safely. The effectiveness of PLiM Programme can be assessed by three complementary kinds of assessment: self-assessment, peer review and comprehensive programme review by the plant owner/ operator. IAEA will provide the assessment service for peer review of PLiM. Preparation for a PLiM Assessment service will be initiated only after the IAEA has been formally approached by a MS and funding (e.g. an existing Technical cooperation project) has

  2. Licensing operators for commercial nuclear power plants

    International Nuclear Information System (INIS)

    Hannon, J.N.

    1988-01-01

    The human element in the operation of commercial nuclear power plants is of utmost importance. Not only must the operators be technically competent in the execution of numerous complicated tasks, they must be capable of working together as a team to diagnose dynamic plant conditions to ensure that their plants are operated safely. The significance of human interaction skills and crew communications has been demonstrated most vividly in TMI and Chernobyl. It follows that the NRC must retain its high standards for licensing operators. This paper discusses activities and initiatives being employed by the NRC to enhance the reliability of its licensing examinations, and to build a highly qualified examiner work force

  3. Operations quality assurance for nuclear power plants

    International Nuclear Information System (INIS)

    1987-01-01

    This standard covers the quality assurance of all activities concerned with the operation and maintenance of plant equipment and systems in CANDU-based nuclear power plants during the operations phase, the period between the completion of commissioning and the start of decommissioning

  4. Comparative study of radiological impact of nuclear power plant and coal-fired power plant: estimation of radiation dose to public from nuclear power plant and coal-fired power plant generation

    International Nuclear Information System (INIS)

    Umbara, Heru; Yatim, Sofyan

    1998-01-01

    Radiation impact assessment of Nuclear Power Plant and Coal-Fired Power Plant in Muria Penninsula was carried out. The computation of radionuclide releases to the atmosphere subjects to gaussian plume model, on the other hand, the radionuclide transfer model between environmental compartment (pathway) follow concentration factor methods. Both models are compiled in GENII-The Hanford Environmental Radiation Dosimetry Software System, which is used in the assessment. Most of all input data for GENII package are site specific, such as meteorological data, stack flow, stack height, population, local consumption except the transfer factor data are taken from the GENII package. The results show that during operation of NPP the maximal exposed individual received annual effective dose 150 nSv at 300 -700 m from the site toward east otherwise in operation of CPP the maximal exposed individual received annual effective dose 410 nSv in the same distance and direction. Both results of the maximal exposed individual received annual effective dose about 0,003 % and 0,008 % of whole body annual dose limit for members of public for NPP and CPP. (author)

  5. Operator psychological selection system for nuclear power plant

    International Nuclear Information System (INIS)

    He Xuhong; Huang Xiangrui

    2004-01-01

    Based on a detailed job analysis of nuclear power plant operator including operation procedures analysis, interview with personnel familiar with operator job, and 9 events happened in the past in the plant involved operator error analysis, several operator work characteristics and performance influence factors are obtained. According to these specific characteristics and factors, referring to the psychological selection research results in the other related critical occupational fields, a full psychological selection system of nuclear power plant operator is forwarded in this paper, including 21 dimensions in 3 facets as general psychological ability, personality and psychological healthy. Practical measurement methods for the proposed selection dimensions are discussed in the end

  6. An analysis of nuclear power plant operating costs

    International Nuclear Information System (INIS)

    1988-01-01

    This report presents the results of a statistical analysis of nonfuel operating costs for nuclear power plants. Most studies of the economic costs of nuclear power have focused on the rapid escalation in the cost of constructing a nuclear power plant. The present analysis found that there has also been substantial escalation in real (inflation-adjusted) nonfuel operating costs. It is important to determine the factors contributing to the escalation in operating costs, not only to understand what has occurred but also to gain insights about future trends in operating costs. There are two types of nonfuel operating costs. The first is routine operating and maintenance expenditures (O and M costs), and the second is large postoperational capital expenditures, or what is typically called ''capital additions.'' O and M costs consist mainly of expenditures on labor, and according to one recently completed study, the majoriy of employees at a nuclear power plant perform maintenance activities. It is generally thought that capital additions costs consist of large maintenance expenditures needed to keep the plants operational, and to make plant modifications (backfits) required by the Nuclear Regulatory Commission (NRC). Many discussions of nuclear power plant operating costs have not considered these capital additions costs, and a major finding of the present study is that these costs are substantial. The objective of this study was to determine why nonfuel operating costs have increased over the past decade. The statistical analysis examined a number of factors that have influenced the escalation in real nonfuel operating costs and these are discussed in this report. 4 figs, 19 tabs

  7. Operating experience review for the AP1000 plant

    International Nuclear Information System (INIS)

    Chaney, T. E.; Lipner, M. H.

    2006-01-01

    Westinghouse is performing an update to the Operating Experience Review (OER) Report for the AP1000 project to account for operating experience since December 1996. Significant Operating Experience Reports, Significant Event Reports, Significant Event Notifications, Operations and Maintenance Reminders, Topical Reports, Event Analysis Reports and Licensee Event Reports were researched for pertinent input to the update. As a part of the OER, Westinghouse has also conducted operator interviews and observations during simulated plant operations and after operating events. The main purpose of the OER is to identify Human Factors Engineering (HFE) related safety issues from existing operating plant experience and to ensure that these issues are addressed in the new design. The issues and lessons learned regarding operating experience provide a basis for improving the plant design. (authors)

  8. Trend and pattern analyses of operational data from nuclear power plants

    International Nuclear Information System (INIS)

    Amesz, J.

    1990-01-01

    One step towards maximizing the benefits gained from plant operating experience is the establishment of a rigorous scheme of classification and storage of operational data related to equipment failures and/or human errors. The analysis of data thus collected can fall into one of the following two categories: in-depth analysis of individual incidents which are considered to be of major significance from the safety point of view; and trend and pattern analyses of the stored data with the aim of identifying situations that warrant further studies or that require particular attention. In order to perform the second type of analyses, various approaches/systems are being used by organizations with interests in the nuclear power domain. Similar methodologies may be used in general industrial safety as well. For the purpose of facilitating a comparison between the different methods, the OECD/NEA Committee on the Safety of Nuclear Installations (CSNI) decided to organize a specialist meeting jointly with the Commission of the European Communities (CEC) for a systematic and comprehensive review of the matter

  9. Optimization of advanced plants operation: The Escrime project

    International Nuclear Information System (INIS)

    Fiche, C.; Papin, B.

    1994-01-01

    The Escrime program aims at defining the optimal share of tasks between humans and computers under normal or accidental plant operation. Basic principles we keep in mind are the following: human operators are likely to be necessary in the operation of future plants because we cannot demonstrate that plant design is error free, so unexpected situation can still happen; automation must not release the operators from their decisional role but only help them avoiding situations of cognitive overload which can lead to increase the risk of errors; the optimum share of tasks between human and automatic systems must be based on a critical analysis of the tasks and of the way they are handled. The last point appeared to be of major importance. The corresponding analysis of the French PWR's operating procedures enabled us to define a unified scheme for plant operation under the form of a hierarchy of goals and means. Beyond this analysis, development of a specific testing facility is under way to check the relevance of the proposed plant operation organization and to test the human-machine cooperation in different situations for various levels of automation. 7 refs, 4 figs

  10. Taxonomy of the nuclear plant operator's role

    International Nuclear Information System (INIS)

    Kisner, R.A.; Fullerton, A.M.; Frey, P.R.; Dougherty, E.M.

    1981-01-01

    A program is presently under way at the Oak Ridge National Laboratory (ORNL) to define the functional design requirements of operational aids for nuclear power plant operators. A first and important step in defining these requirements is to develop an understanding of the operator's role or function. This paper describes a taxonomy of operator functions that applies during all operational modes and conditions of the plant. Other topics such as the influence of automation, role acceptance, and the operator's role during emergencies are also discussed. This systematic approach has revealed several areas which have potential for improving the operator's ability to perform his role

  11. Development of Megawatt Demand Setter for Plant Operating Flexibility

    International Nuclear Information System (INIS)

    Kim, Se Chang; Hah, Yeong Joon; Song, In Ho; Lee, Myeong Hun; Chang, Do Ik; Choi, Jung In

    1993-05-01

    The Conceptual design of the Megawatt Demand Setter (MDS) is presented for the Korean Standardized Nuclear Power Plant. The MDS is a digital supervisory limitation system. The MDS assures that the plant does not exceed the operating limits by regulating the plant operations through monitoring the operating margins of the critical parameters. MDS is aimed at increasing the operating flexibility which allow the nuclear plant to meet the grid demand in very efficient manner. It responds to the grid demand without penalizing plant availability by limiting the load demand when the operating limits are approached or violated. MDS design concepts were tested using simulation responses of Yonggwang Units 3, 4. The design of the Yonggwang Units 3, 4 would be used as a reference which designs of Korean Standardized Nuclear Power Plants would be based upon. The simulation results illustrate that the MDS can be used to improve operating flexibility. (Author)

  12. The assisting system for uranium enrichment plant operation

    International Nuclear Information System (INIS)

    Nakazawa, Hiroaki; Yamamoto, Fumio

    1990-01-01

    We have been developing an operation assisting system, partially supported by AI system, for uranium enrichment plant. The AI system is a proto-type system aiming a final one which can be applied to any future large uranium enrichment plant and also not only to specific operational area but also to complex and multi-phenomenon operational area. An existing AI system, for example facility diagnostic system that utilizes the result of CCT analysis as knowledge base, has weakness in flexibility and potentiality. To build AI system, we have developed the most suitable knowledge representations using deep knowledge for each facility or operation of uranium enrichment plant. This paper describes our AI proto-type system adopting several knowledge representations that can represent an uranium enrichment plant's operation with deep knowledge. (author)

  13. Plant fertilization: maximizing reproductive success.

    Science.gov (United States)

    Dresselhaus, Thomas; Sprunck, Stefanie

    2012-06-19

    Sperm competition does not occur in flowering plants as typically only a single pair of sperm cells is delivered for double fertilization. Two recent reports show that plants are capable of avoiding reproductive failure when defective sperm cells are released. Copyright © 2012 Elsevier Ltd. All rights reserved.

  14. Task-oriented maximally entangled states

    International Nuclear Information System (INIS)

    Agrawal, Pankaj; Pradhan, B

    2010-01-01

    We introduce the notion of a task-oriented maximally entangled state (TMES). This notion depends on the task for which a quantum state is used as the resource. TMESs are the states that can be used to carry out the task maximally. This concept may be more useful than that of a general maximally entangled state in the case of a multipartite system. We illustrate this idea by giving an operational definition of maximally entangled states on the basis of communication tasks of teleportation and superdense coding. We also give examples and a procedure to obtain such TMESs for n-qubit systems.

  15. Optimization of the daily operation of the plants of Medio Sao Francisco; Otimizacao da operacao diaria das usinas do Medio Sao Francisco

    Energy Technology Data Exchange (ETDEWEB)

    Fernandes, Jessica Pillon Torralba; Colnago, Glauber Renato; Correia, Paulo de Barros; Ohishi, Takaaki [Universidade Estadual de Campinas (UNICAMP), SP (Brazil). Fac. de Engenharia Mecanica. Dept. de Energia], emails: pillon@fem.unicamp.br, colnago@fem.unicamp.br, pcorreia@fem.unicamp.br, taka@densis.fee.unicamp.br

    2010-07-01

    This paper presents an optimization model for daily operation of Sao Francisco hydroelectric power plants. The study considers eight power plants - Sobradinho (USB), Luiz Gonzaga (ULG), Apolonio Sales (UAS), Paulo Afonso I, II, III, (UPA), Paulo Afonso IV (USQ) e Xingo (UXG)- belongs to Sao Francisco Hydroelectric Company (CHESF). Its objective is to maximize the power plant efficiency and to minimize the number of startup and shutdowns of generating units (GU), simultaneously. Considering those GU are equal, is determined the number of units to be dispatched and their charge. The optimal dispatch, linear and non-linear programming techniques and genetic algorithms (GA) support this article. (author)

  16. Review of operating history at the Palisades Nuclear Plant

    International Nuclear Information System (INIS)

    Mays, G.T.; Harrington, K.H.

    1982-01-01

    the Systematic Evaluation Program Branch (SEPB) of the Nuclear Regulatory Commission (NRC) is conducting the Systematic Evaluation Program whose purpose is to determine the safety margins of the design and operation of the eleven oldest operating commercial nuclear power plants in the United States. A portion of the SEP includes the compilation and interpretation of operational occurrences at these plants. This summary describes the methodology and results of the operational experience review of Palisades Nuclear Plant. The review includes a detailed examination of the operating experience in two segments - plant shutdowns and power reductions, and reportable events

  17. Energy prices in the presence of plant indivisibilities

    International Nuclear Information System (INIS)

    Fischer, Ronald; Serra, Pablo

    2003-01-01

    In several countries (Chile, Bolivia, Argentina and Peru, among others), power plants are dispatched according to merit order, i.e. based on the marginal operating costs of the plants. In this scheme, the operating plant with the highest marginal cost sets the spot price at which firms trade the energy required to fulfill their contracts. The underlying peak-load pricing model assumes that plants can operate at any level up to capacity, whereas real power plants have minimum operating levels. This implies that a low cost plant might have to reduce its supply in order to accommodate the minimum operating level of a more expensive power plant. This paper derives the welfare maximizing price rules in this case and shows that the standard peak-load pricing rules no longer apply

  18. Safety of Nuclear Power Plants: Commissioning and Operation

    International Nuclear Information System (INIS)

    2011-01-01

    The safety of a nuclear power plant is ensured by means of proper site selection, design, construction and commissioning, and the evaluation of these, followed by proper management, operation and maintenance of the plant. In a later phase, a proper transition to decommissioning is required. The organization and management of plant operations ensures that a high level of safety is achieved through the effective management and control of operational activities. This publication is a revision of the Safety Requirements publication Safety of Nuclear Power Plants: Operation, which was issued in 2000 as IAEA Safety Standards Series No. NS-R-2. The purpose of this revision was to restructure Safety Standards Series No. NS-R-2 in the light of new operating experience and new trends in the nuclear industry; to introduce new requirements that were not included in Safety Standards Series No. NS-R-2 on the operation of nuclear power plants; and to reflect current practices, new concepts and technical developments. This update also reflects feedback on the use of the standards, both from Member States and from the IAEA's safety related activities. The publication is presented in the new format for Safety Requirements publications. The present publication reflects the safety principles of the Fundamental Safety Principles. It has been harmonized with IAEA Safety Standards Series No. GS-R-3 on The Management System for Facilities and Activities. Guidance on the fulfilment of the safety requirements is provided in supporting Safety Guides. The terminology used in this publication is defined and explained in the IAEA Safety Glossary. The objective of this publication is to establish the requirements which, in the light of experience and the present state of technology, must be satisfied to ensure the safe operation of nuclear power plants. These requirements are governed by the safety objective and safety principles that are established in the Fundamental Safety Principles. This

  19. Hybrid Proximal-Point Methods for Zeros of Maximal Monotone Operators, Variational Inequalities and Mixed Equilibrium Problems

    Directory of Open Access Journals (Sweden)

    Kriengsak Wattanawitoon

    2011-01-01

    Full Text Available We prove strong and weak convergence theorems of modified hybrid proximal-point algorithms for finding a common element of the zero point of a maximal monotone operator, the set of solutions of equilibrium problems, and the set of solution of the variational inequality operators of an inverse strongly monotone in a Banach space under different conditions. Moreover, applications to complementarity problems are given. Our results modify and improve the recently announced ones by Li and Song (2008 and many authors.

  20. Engineerig of structural modifications for operating nuclear plants

    International Nuclear Information System (INIS)

    Duffy, T.J.; Gazda, P.A.

    1983-01-01

    The engineering of structural modifications for operating nuclear plants offers many challenges in the areas of scheduling of work, field adjustments, and engineering staff planning. The scheduling of structural modification work for operating nuclear plants is normally closely tied to planned or unplanned outages of the plant. Coordination between the structural engineering effort, the operating plant staff, and the contractor who will be performing the modifications is essential to ensure that all work can be completed within the allotted time. Due to the inaccessibility of areas in operating plants or the short time available to perform the structural engineering in the case of an unscheduled outage, field verification of a design is not always possible prior to initiating the construction of the modification. This requires the structural engineer to work closely with the contractor to promptly resolve problems due to unanticipated interferences or material procurement that may arise during the course of construction. The engineering staff planning for structural modifications at an operating nuclear plant must be flexible enough to permit rapid response to the common 'fire drills', but controlled enough to assure technically correct designs and minimize the expenditure of man-hours and resulting engineering cost. (orig.)

  1. How sulphur was dislodged to sustain plant operation

    International Nuclear Information System (INIS)

    Verma, A.N.; Agarwal, A.K.

    1997-01-01

    Heavy Water Plant (Kota) employs chemical exchange between water and hydrogen sulphide gas. Formation of sulphur is a known phenomena during production of heavy water in G.S. process plants. It is observed that after three years of plant operation this sulphur is enough to choke the cold tower trays causing flooding of exchange towers and resultant decrease in throughput. G.S. process plants normally go for major turn around once in four years when sulphur is either manually cleaned or removed by steam wash after hydrogen sulphide gas has been removed from the system and towers have been fully decontaminated. As throughput starts decreasing after third year and plant operation becomes more difficult in fourth year, HWP (Kota) had evolved a procedure of heating the towers for dislodging sulphur from sieve trays when plant is running. With these procedures plant operation could be sustained without tower floodings even in fourth year, before plant could go for major turn around for manual removal of sulphur

  2. Nuclear power plant operation experience - a feedback programme

    International Nuclear Information System (INIS)

    Banica, I.; Sociu, F.; Margaritescu, C.

    1994-01-01

    An effective high quality maintenance programme is required for the safe reliable operation of a nuclear power plant. To achieve the objectives of such a programme, both plant management and staff must be highly dedicated and motivated to perform high quality work at all levels. Operating and maintenance experience data collections and analysis are necessary in order to enhance the safety of the plant and reliability of the structures systems and components throughout their operating life. Significant events, but also minor incident, may reveal important deficiencies or negative trends adverse to safety. Therefore, a computer processing system for collecting, classifying and evaluating abnormal events or findings concerning operating-maintenance and for feeding back the results of the lessons learned from experience into the design and the operation of our nuclear power plant is considered to be of paramount importance. (Author)

  3. On the plant operators performance during earthquake

    International Nuclear Information System (INIS)

    Kitada, Y.; Yoshimura, S.; Abe, M.; Niwa, H.; Yoneda, T.; Matsunaga, M.; Suzuki, T.

    1994-01-01

    There is little data on which to judge the performance of plant operators during and after strong earthquakes. In order to obtain such data to enhance the reliability on the plant operation, a Japanese utility and a power plant manufacturer carried out a vibration test using a shaking table. The purpose of the test was to investigate operator performance, i.e., the quickness and correctness in switch handling and panel meter read-out. The movement of chairs during earthquake as also of interest, because if the chairs moved significantly or turned over during a strong earthquake, some arresting mechanism would be required for the chair. Although there were differences between the simulated earthquake motions used and actual earthquakes mainly due to the specifications of the shaking table, the earthquake motions had almost no influence on the operators of their capability (performance) for operating the simulated console and the personal computers

  4. Operator training simulator for BWR nuclear power plant

    International Nuclear Information System (INIS)

    Watanabe, Tadasu

    1988-01-01

    For the operation management of nuclear power stations with high reliability and safety, the role played by operators is very important. The effort of improving the man-machine interface in the central control rooms of nuclear power stations is energetically advanced, but the importance of the role of operators does not change. For the training of the operators of nuclear power stations, simulators have been used from the early stage. As the simulator facilities for operator training, there are the full scope simulator simulating faithfully the central control room of an actual plant and the small simulator mainly aiming at learning the plant functions. For BWR nuclear power stations, two full scope simulators are installed in the BWR Operator Training Center, and the training has been carried out since 1974. The plant function learning simulators have been installed in respective electric power companies as the education and training facilities in the companies. The role of simulators in operator training, the BTC No.1 simulator of a BWR-4 of 780 MWe and the BTC No.2 simulator of a BWR-5 of 1,100 MWe, plant function learning simulators, and the design of the BTC No.2 simulator and plant function learning simulators are reported. (K.I.)

  5. Transparency and efficiency through plant operations management systems

    International Nuclear Information System (INIS)

    Ladage, L.

    2001-01-01

    Plant operations management systems, being IT application systems, provide integral support of the business processes making up plant operations management. The use of plant operations management systems improves mutually interdependent factors, such as high economic performance, high availability, and maximum safety. Since its commissioning in 1988, the Emsland nuclear power station (KKE) has been run with the IBFS plant operations management system. The work flow management system (WfMS), a module of IBFS, is described as an example of job order processing. IBFS-WfMS is to optimize all processes, thus cutting costs and ensuring that processes are run and documented reliably. Assessing the savings effect achieved through the use of IBFS-WfMS clearly reveals the savings in work/time achieved by the system. These savings are quoted as approx. 4 minutes and DM 10, respectively, per working step, which corresponds to several dozens of manyears or several million DM per annum in the KKE plant under consideration. This result can be extrapolated to other plants. (orig.) [de

  6. The control of operational risk in nuclear power plant operations - Some cross-cultural perspectives

    International Nuclear Information System (INIS)

    Suchard, A.; Rochlin, G.

    1992-01-01

    The operation of nuclear power plants requires the management of a complex technology under exacting performance and safety criteria. Organizations operating nuclear power plants are faced with the challenge of simultaneously meeting technical, organizational, and social demands, striving toward perfection in a situation where learning by trial and error can be too costly. In this process, they interact with regulatory bodies who seek to help minimize operational risk by imposing and upholding safety standards. The character of this interaction differs in various countries, as does the larger cultural setting. The study generally pursued the question of how organizations operating complex and demanding technologies adapt to such requirements and circumstances, and how they can succeed in delivering nearly error-free performance. One aspect of this study includes the comparison of organizational and cultural environments for nuclear power plant operations in the US, France, Germany, Sweden, and Switzerland. The research involved in-depth, continuous observations on location and interviews with plant personnel, especially control operators, at one plant in each country

  7. Nuclear power plant operating experience. Annual report, 1978

    International Nuclear Information System (INIS)

    Beebe, M.R.

    1979-12-01

    This report is the fifth in a series of reports issued annually that summarizes the operating experience of US nuclear power plants in commercial operation. Power generation statistics, plant outages, reportable occurrences, fuel element performance, occupational radiation exposure for each plant are presented. Summary highlights of these areas are discussed. The report includes 1978 data from 65 plants - 25 boiling water reactor plants and 40 pressurized water reactor plants. Discussion of radioactive effluents which has been a part of this report in previous years, has not been included in this issue because of late acquisition of data

  8. Maximizing the use of research reactors in training power reactor operating staff with special reference to US experience

    International Nuclear Information System (INIS)

    Cox, J.A.

    1976-01-01

    Research reactors have been used in training nuclear power plant personnel for many years. Using the experience in the United States of America a programme is proposed that will maximize the training conducted at a research reactor and lessen the time that the staff must spend training elsewhere. The programme is adaptable to future training of replacement staff and for staff retraining. (author)

  9. Improved core monitoring for improved plant operations

    International Nuclear Information System (INIS)

    Mueller, N.P.

    1987-01-01

    Westinghouse has recently installed a core on-line surveillance, monitoring and operations systems (COSMOS), which uses only currently available core and plant data to accurately reconstruct the core average axial and radial power distributions. This information is provided to the operator in an immediately usable, human-engineered format and is accumulated for use in application programs that provide improved core performance predictive tools and a data base for improved fuel management. Dynamic on-line real-time axial and radial core monitoring supports a variety of plant operations to provide a favorable cost/benefit ratio for such a system. Benefits include: (1) relaxation or elimination of certain technical specifications to reduce surveillance and reporting requirements and allow higher availability factors, (2) improved information displays, predictive tools, and control strategies to support more efficient core control and reduce effluent production, and (3) expanded burnup data base for improved fuel management. Such systems can be backfit into operating plants without changing the existing instrumentation and control system and can frequently be implemented on existing plant computer capacity

  10. Obtaining plant Miscanthus sacchariflorus (Maxim. Hack and Miscanthus sinensis Andersson in vitro culture by indirect morphogenesis

    Directory of Open Access Journals (Sweden)

    С. М. Гонтаренко

    2017-03-01

    Full Text Available Purpose. To obtain Miscanthus sacchariflorus (Maxim. Hack and Miscanthus sinensis Andersson in vitro culture by indirect morphogenesis. Methods. Biotechnological procedures, mathematical and statistical analyses. Results. Composition of nutrient medium was developed intended for induction of callusogenesis from Miscanthus seeds with a poor germination and viability of seedlings – Murashige and Skoog (MS medium was modified for the amount of macroelements (half-dose that was supplemented with amino acids (300 mg/l of glutamic acid, 50 mg/l of aspartic acid, 5 mg/l of tyrosine, 3 mg/l of arginine, 2 mg/l of hydroxyproline and plant growth regulators [2,5 mg/l of 2.4D (2.4-Dichlorophenoxyacetic acid, 0,6 mg/l of BAP (6-Benzyl-aminopurine and 0,3 mg/l of ABA (Abscisic acid]. Composition of nutrient medium was developed for regeneration of microplants from callus – agar MS medium was modified for the amount of macroelements (half-dose supplemented with vitamins: 10 mg/l of thiaminum, 1,0 mg/l of pyridoxine, 1,0 mg/l of nicotinic acid (by White, 1,0 mg/l of ascorbic acid, 250 mg/l of glutamic acid, 2,0 mg/l of BAP, 0,3 mg/l of NAA (Naphthaleneacetic acid. On this medium, 100% regeneration of M. sacchariflorus (Maxim. Hack and 50% regeneration of M. sinensis Andersson was obtained. Due to media modification aimed at initiating callusogenesis and microplants regeneration, reproduction factor of M. sinensis was increased 20 times at the average, M. sacchariflorus – 35–40 times. Conclusions. Plants of M. sacchariflorus (Maxim. Hack and M. sinensis Andersson were obtained in vitro culture by initiation of callusogenes and microplants regeneration from the Miscanthus seeds with poor germination and viability on nutrient media of certain composition.

  11. GLObal RIsk MANagement system for plant operations GLORIMAN

    International Nuclear Information System (INIS)

    Silverman, Eugene B.

    2004-01-01

    Considerable effort has been expended by nuclear power plants in the preparation of their Independent Plant Evaluation (IPE) programs. The result of these projects is the generation of very useful information concerning plant operations, states, availability and risk. The potential application of this information is often unrealized due to the unwieldy form of the data as reported in the IPE. Plant personnel would benefit greatly from quick access to risk information as a means of supporting day-to-day decisions, but the information exists only in a difficult to understand and inaccessible form. There is a need to translate the costs invested in Probabilistic Risk Assessment (PRA) projects into a useable tool for plant personnel. This paper describes a software tool developed by ARD Corporation to be used by plants to assist in determining the operational risks and benefits associated with modifying the plant state during normal and off-normal operations for performing maintenance. This tool integrates a relational database with an easy-to-use graphical user interface and several unique software features. The result is a responsive, easy-to-understand tool that integrates an organization's PRA/IPE into the operational and maintenance needs of the station. The Global Risk Management System is designed to allow the user to evaluate the risk associated with current and proposed plant states. The impact of changes in plant configuration, operational modes and equipment availability are assessed from a risk management perspective, but displayed in an easy-to-understand form for personnel not familiar with risk methodology. Additionally, pipe and instrumentation drawings can be retrieved by the user and displayed as a reference tool. (author)

  12. Operation of nuclear power plants

    International Nuclear Information System (INIS)

    Severa, P.

    1988-04-01

    The textbook for training nuclear power plant personnel is centred on the most important aspects of operating modes of WWER-440 reactors. Attention is devoted to the steady state operation of the unit, shutdown, overhaul with refuelling, physical and power start-up. Also given are the regulations of shift operation and the duties of individual categories of personnel during the shift and during the change of shifts. (Z.M.). 3 figs., 1 tab

  13. Technology of turbine plant operating with wet steam

    International Nuclear Information System (INIS)

    1989-01-01

    The technology of turbine plant operating with wet steam is a subject of continuing interest and importance, notably in view of the widespread use of wet steam cycles in nuclear power plants and the recent developments of advanced low pressure blading for both conventional and wet steam turbines. The nature of water formation in expanding steam has an important influence on the efficiency of turbine blading and on the integrity and safe operating life of blading and associated turbine and plant components. The subjects covered in this book include research, flow analysis and measurement, development and design of turbines and ancillary plant, selection of materials of construction, manufacturing methods and operating experience. (author)

  14. A basis for sound management-plant-operator interface

    International Nuclear Information System (INIS)

    Oak, H.D.

    1983-01-01

    Sound management-plant-operator interface is based on the application of suitable quality assurance principles. Quality assurance can aptly be termed ''putting priority and emphasis where such are due''. Accordingly, the application of suitable quality assurance principles achieves the all-important combination of both safety and production. Neither of these is mutually exclusive of the other, and both together establish the prime foundation for long-term nuclear power plant operation. This paper presents the application of suitable quality assurance principles to the management, the plant, the operators, and the interface between them. (author)

  15. The critical safety functions and plant operation

    International Nuclear Information System (INIS)

    Corcoran, W.R.; Church, J.F.; Porter, N.J.; Cross, M.T.; Guinn, W.M.

    1981-01-01

    The paper outlines the operator's role in nuclear safety and introduces the concept of ''safety functions''. Safety functions are a group of actions that prevent core melt or minimize radiation releases to the general public. They can be used to provide a hierarchy of practical plant protection that an operator should use. ''An accident identical to that at Three Mile Island is not going to happen again'', said the Rogovin investigators. The concepts put forward in this paper are intended to help the operator avoid serious consequence from the next unexpected threat. On the basis of the safety evaluation, the operator has three roles in assuring that the consequences of an event will be no worse than the predicted acceptable results. These three operator roles are: first, maintain plant setup in readiness to properly respond; second, operate the plant in a manner such that fewer, milder events minimize the frequency and the severity of adverse events; third, the operator needs to monitor the plant to verify that the safety functions are accomplished. The operator needs a systematic approach to mitigating the consequences of an event. The concept of ''safety function'' introduces that systematic approach and prevents a hierarchy of protection. If the operator has difficulty in identifying an event for any reason, the systematic safety function approach allows ones to accomplish the overall path of mitigating consequences. There are ten identified functions designed to protect against core melt, preserve containment integrity, prevent indirect release of radioactivity, and maintain vital auxiliaries needed to support the other safety functions. The paper describes in detail the operator's role and the safety functions, and provides many examples of the use of alternative success paths to accomplish the safety function

  16. Computer simulation of thermal plant operations

    CERN Document Server

    O'Kelly, Peter

    2012-01-01

    This book describes thermal plant simulation, that is, dynamic simulation of plants which produce, exchange and otherwise utilize heat as their working medium. Directed at chemical, mechanical and control engineers involved with operations, control and optimization and operator training, the book gives the mathematical formulation and use of simulation models of the equipment and systems typically found in these industries. The author has adopted a fundamental approach to the subject. The initial chapters provide an overview of simulation concepts and describe a suitable computer environment.

  17. Plant operation monitoring method and device therefor

    International Nuclear Information System (INIS)

    Ando, Tsugio; Matsuki, Tsutomu.

    1997-01-01

    The present invention provides a method of and a device for monitoring the operation of a nuclear power plant during operation, which improves the safety and reliability of operation without increasing an operator's burden. Namely, a chief in charge orally instruct an operation to an operator upon the operation of a plant constituent equipment. The operator points the equipment and calls the name. Actual operation instruction for the equipment is inputted after confirmation by oral response. The voices of theses series of operation instruction/point-calling/response confirmation are taken into a voice recognition processing device. The processing device discriminates each of the person who calls, and discriminates the content of the calls and objective equipments to be operated. Then, the series of procedures and contents of the operation for the equipments previously disposed in the data base are compared with the order of inputted calls, discriminated contents and the objective equipments to be operated. If they are not agreed with each other, the operation instruction is blocked even if actual operation instructions are inputted. (I.S.)

  18. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1993-06-01

    Quarterly reports on the operation of Finnish nuclear power plants describe events and observations, relating to nuclear and radiation safety, which the Finnish Centre for Radiation and Nuclear Safety considers significant. Also other events of general interest are reported. The reports also include a summary of the radiation safety of plant personnel and the environment, as well as tabulated data on the plants' production and load factors

  19. The operating organization for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2001-01-01

    This Safety Guide was prepared under the IAEA programme for safety standards for nuclear power plants. The present publication is a revision of the IAEA Safety Guide on Management of Nuclear Power Plants for Safe Operation issued in 1984. It supplements Section 2 of the Safety Requirements publication on Safety of Nuclear Power Plants: Operation. Nuclear power technology is different from the customary technology of power generation from fossil fuel and by hydroelectric means. One major difference between the management of nuclear power plants and that of conventional generating plants is the emphasis that should be placed on nuclear safety, quality assurance, the management of radioactive waste and radiological protection, and the accompanying national regulatory requirements. This Safety Guide highlights the important elements of effective management in relation to these aspects of safety. The attention to be paid to safety requires that the management recognize that personnel involved in the nuclear power programme should understand, respond effectively to, and continuously search for ways to enhance safety in the light of any additional requirements socially and legally demanded of nuclear energy. This will help to ensure that safety policies that result in the safe operation of nuclear power plants are implemented and that margins of safety are always maintained. The structure of the organization, management standards and administrative controls should be such that there is a high degree of assurance that safety policies and decisions are implemented, safety is continuously enhanced and a strong safety culture is promoted and supported. The objective of this publication is to guide Member States in setting up an operating organization which facilitates the safe operation of nuclear power plants to a high level internationally. The second objective is to provide guidance on the most important organizational elements in order to contribute to a strong safety

  20. The operating organization for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    This Safety Guide was prepared under the IAEA programme for safety standards for nuclear power plants. The present publication is a revision of the IAEA Safety Guide on Management of Nuclear Power Plants for Safe Operation issued in 1984. It supplements Section 2 of the Safety Requirements publication on Safety of Nuclear Power Plants: Operation. Nuclear power technology is different from the customary technology of power generation from fossil fuel and by hydroelectric means. One major difference between the management of nuclear power plants and that of conventional generating plants is the emphasis that should be placed on nuclear safety, quality assurance, the management of radioactive waste and radiological protection, and the accompanying national regulatory requirements. This Safety Guide highlights the important elements of effective management in relation to these aspects of safety. The attention to be paid to safety requires that the management recognize that personnel involved in the nuclear power programme should understand, respond effectively to, and continuously search for ways to enhance safety in the light of any additional requirements socially and legally demanded of nuclear energy. This will help to ensure that safety policies that result in the safe operation of nuclear power plants are implemented and that margins of safety are always maintained. The structure of the organization, management standards and administrative controls should be such that there is a high degree of assurance that safety policies and decisions are implemented, safety is continuously enhanced and a strong safety culture is promoted and supported. The objective of this publication is to guide Member States in setting up an operating organization which facilitates the safe operation of nuclear power plants to a high level internationally. The second objective is to provide guidance on the most important organizational elements in order to contribute to a strong safety

  1. The operating organization for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2004-01-01

    This Safety Guide was prepared under the IAEA programme for safety standards for nuclear power plants. The present publication is a revision of the IAEA Safety Guide on Management of Nuclear Power Plants for Safe Operation issued in 1984. It supplements Section 2 of the Safety Requirements publication on Safety of Nuclear Power Plants: Operation. Nuclear power technology is different from the customary technology of power generation from fossil fuel and by hydroelectric means. One major difference between the management of nuclear power plants and that of conventional generating plants is the emphasis that should be placed on nuclear safety, quality assurance, the management of radioactive waste and radiological protection, and the accompanying national regulatory requirements. This Safety Guide highlights the important elements of effective management in relation to these aspects of safety. The attention to be paid to safety requires that the management recognize that personnel involved in the nuclear power programme should understand, respond effectively to, and continuously search for ways to enhance safety in the light of any additional requirements socially and legally demanded of nuclear energy. This will help to ensure that safety policies that result in the safe operation of nuclear power plants are implemented and that margins of safety are always maintained. The structure of the organization, management standards and administrative controls should be such that there is a high degree of assurance that safety policies and decisions are implemented, safety is continuously enhanced and a strong safety culture is promoted and supported. The objective of this publication is to guide Member States in setting up an operating organization which facilitates the safe operation of nuclear power plants to a high level internationally. The second objective is to provide guidance on the most important organizational elements in order to contribute to a strong safety

  2. Qualification of nuclear power plant operations personnel

    International Nuclear Information System (INIS)

    1984-01-01

    With the ultimate aim of reducing the possibility of human error in nuclear power plant operations, the Guidebook discusses the organizational aspects, the staffing requirements, the educational systems and qualifications, the competence requirements, the ways to establish, preserve and verify competence, the specific aspects of personnel management and training for nuclear power plant operations, and finally the particular situations and difficulties to be overcome by utilities starting their first nuclear power plant. An important aspect presented in the Guidebook is the experience in training and qualification of nuclear power plant personnel in various countries: Argentina, Belgium, Canada, Czechoslovakia, France, Federal Republic of Germany, Spain, Sweden, United Kingdom and United States of America

  3. IAEA activity on operator support systems in nuclear power plants

    International Nuclear Information System (INIS)

    Dounaev, V.; Fujita, Y.; Juslin, K.; Haugset, K.; Lux, I.; Naser, J.

    1994-01-01

    Various operator support systems for nuclear power plants are already operational or under development in the IAEA Member States. Operator support systems are based on intelligent data processing and, in addition to plant operation, they are also becoming more important for safety. A key feature of operator support systems is their availability to restructure data to increase its relevance for a given situation. This can improve the user's ability to identify plant mode, system state, and component state and to identify and diagnose faults. Operator support systems can also assist the user in planning and implementing corrective actions to improve the nuclear power plant's availability and safety. In September 1991, the IAEA Committee for Contractual Scientific Services approved the Co-ordinated Research Programme (CRP) on ''Operator Support Systems in Nuclear Power Plants'' in the framework of the Project ''Man-Machine Interface Studies''. The main objective of this programme is to provide guidance and technology transfer for the development and implementation of operator support systems. This includes the experience with human-machine interfaces and closely related issues such as instrumentation and control, the use of computers in nuclear power plants, and operator qualification. (author)

  4. US nuclear power plant operating cost and experience summaries

    International Nuclear Information System (INIS)

    Kohn, W.E.; Reid, R.L.; White, V.S.

    1998-02-01

    NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov)

  5. US nuclear power plant operating cost and experience summaries

    Energy Technology Data Exchange (ETDEWEB)

    Kohn, W.E.; Reid, R.L.; White, V.S.

    1998-02-01

    NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov).

  6. Management of nuclear power plants for safe operation

    International Nuclear Information System (INIS)

    Kueffer, K.

    1980-01-01

    This lecture covers management aspects which have an immediate bearing on safety and identifies the objectives and tasks of management which are required for safe operation of a nuclear power plant and is based on the Codes of Practice and Safety Guides of the IAEA as well as arrangements in use at the Swiss Nuclear Power Station Beznau. This lecture - discusses the factors to be considered in structuring the operating organization, the support to be provided to plant management, the services and facilities needed and the management system for assuring the safety tasks are performed - describes the responsibilities of plant management and operating organization - outlines the requirements for recruitment, training and retraining as well as qualification and authorization of personnel - describes the programmes for maintenance, testing, examination, inspection, radiological protection, quality assurance, waste management, fuel management, emergency arrangement and security - describes the development of plant operating procedures including procedures to protect the personnel - outlines the requirements for initial and subsequent operation - describes the importance for evaluation and feedback of operating experience - describes the procedures for changes in hardware, procedures and set points - outlines the information flow and the requirements in reference to records and reports. (orig./RW)

  7. Ensuring safe operation at the Loviisa nuclear power plant

    International Nuclear Information System (INIS)

    Regnell, B.

    1985-01-01

    Safe operation of a nuclear plant can be achieved only if the plant is designed according to stringent safety principles, if the construction and commissioning work meets high standards and finally if proper attention is paid to the safety aspects in all operational activities. Clearly formulated safety principles and standards are required for all these steps. In the early phases of the Loviisa project only a few IAEA codes of practice and safety guides were available. Their usefulness was, however, felt early, and valuable guidance was offered by them in formulating the quality assurance programme, for example. The paper describes the approach taken in order to achieve high operational safety at the first nuclear power station in Finland, the Loviisa plant. The involvement in the project of the plant owner, Imatran Voima Oy (IVO), was very large, the company serving as its own architect-engineer. Experience has shown that the thorough knowledge of the plant, down to the finest details, obtained by extensive participation in design, erection and commissioning of the plant, is invaluable in the actual operation of the plant. This manifests itself most clearly in the event of malfunctions and incidents or if modifications have to be undertaken. Many different activities affecting the operational safety can be identified: actual operation of the plant, including the creation and maintaining of technical specifications, procedures, instructions, documentation systems, etc.; maintenance, repair and modification work; in-service inspection and testing practices; component failure data collection and analysis; incident reporting, collection and evaluation systems; operator training; quality assurance programme; procedures and implementation; reviews of operational safety by an independent safety committee; and supervision by the safety authorities. In the paper, all these activities are described in some detail. (author)

  8. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1993-03-01

    Quarterly reports on the operation of Finnish nuclear power plants describe events and observations, relating to nuclear and radiation safety, which the Finnish Centre for Radiation and Nuclear Safety considers safety significant. Also other events of general interest are reported. The reports also include a summary of the radiation safety of plant personnel and the environment, as well as tabulated data on the plants' production and load factors

  9. Operational limits and conditions and operating procedures for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    This Safety Guide was prepared as part of the Agency's programme for establishing safety standards relating to nuclear power plants. The present Safety Guide supersedes the IAEA Safety Guide on Operational Limits and Conditions for Nuclear Power Plants which was issued in 1979 as Safety Series No. 50-SG-O3. For a nuclear power plant to be operated in a safe manner, the provisions made in the final design and subsequent modifications shall be reflected in limitations on plant operating parameters and in the requirements on plant equipment and personnel. Under the responsibility of the operating organization, these shall be developed during the design safety evaluation as a set of operational limits and conditions (OLCs). A major contribution to compliance with the OLCs is made by the development and utilization of operating procedures (OPs) that are consistent with and fully implement the OLCs. The requirements for the OLCs and OPs are established in Section 5 of the IAEA Safety Requirements publication Safety of Nuclear Power Plants: Operation, which this Safety Guide supplements. The purpose of this Safety Guide is to provide guidance on the development, content and implementation of OLCs and OPs. The Safety Guide is directed at both regulators and owners/operators. This Safety Guide covers the concept of OLCs, their content as applicable to land based stationary power plants with thermal neutron reactors, and the responsibilities of the operating organization regarding their establishment, modification, compliance and documentation. The OPs to support the implementation of the OLCs and to ensure their observance are also within the scope of this Safety Guide. The particular aspects of the procedures for maintenance, surveillance, in-service inspection and other safety related activities in connection with the safe operation of nuclear power plants are outside the scope of this Safety Guide but can be found in other IAEA Safety Guides. Section 2 indicates the

  10. Operational limits and conditions and operating procedures for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2000-01-01

    This Safety Guide was prepared as part of the Agency's programme for establishing safety standards relating to nuclear power plants. The present Safety Guide supersedes the IAEA Safety Guide on Operational Limits and Conditions for Nuclear Power Plants which was issued in 1979 as Safety Series No. 50-SG-O3. For a nuclear power plant to be operated in a safe manner, the provisions made in the final design and subsequent modifications shall be reflected in limitations on plant operating parameters and in the requirements on plant equipment and personnel. Under the responsibility of the operating organization, these shall be developed during the design safety evaluation as a set of operational limits and conditions (OLCs). A major contribution to compliance with the OLCs is made by the development and utilization of operating procedures (OPs) that are consistent with and fully implement the OLCs. The requirements for the OLCs and OPs are established in Section 5 of the IAEA Safety Requirements publication Safety of Nuclear Power Plants: Operation, which this Safety Guide supplements. The purpose of this Safety Guide is to provide guidance on the development, content and implementation of OLCs and OPs. The Safety Guide is directed at both regulators and owners/operators. This Safety Guide covers the concept of OLCs, their content as applicable to land based stationary power plants with thermal neutron reactors, and the responsibilities of the operating organization regarding their establishment, modification, compliance and documentation. The OPs to support the implementation of the OLCs and to ensure their observance are also within the scope of this Safety Guide. The particular aspects of the procedures for maintenance, surveillance, in-service inspection and other safety related activities in connection with the safe operation of nuclear power plants are outside the scope of this Safety Guide but can be found in other IAEA Safety Guides. Section 2 indicates the

  11. Changing nuclear plant operating limits during startup and shutdown

    International Nuclear Information System (INIS)

    Arnold, E.C.; Carlson, R.W.; Ray, N.K.; Roarty, D.H.

    1990-01-01

    During startup and shutdown operation of pressurized water reactor (PWR) nuclear power plants, a low pressure decay heat removal system is used to maintain core cooling. During these phases of operation, there are numerous operating practices and design limits to meet special and sometimes conflicting requirements unique to these operations. This paper evaluates the impact and interdependencies of recent issues on plant operation and design

  12. Quality assurance during operation of nuclear power plants

    International Nuclear Information System (INIS)

    1981-01-01

    This Safety Guide provides requirements and recommendations for the establishment and implementation of quality assurance for activities important to safety during commissioning, operation and decommissioning of a nuclear power plant, hereinafter referred to in this Guide as the operation phase or operation. It applies to activities such as: operating, inspecting, testing, commissioning, refuelling, maintaining, repairing, modifying and eventual shut-down and decommissioning of nuclear power plants. It applies also to associated activities related to safety, such as environmental monitoring and responses to emergencies

  13. Nuclear power plant operation 2016. Pt. 1

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2017-05-15

    A report is given on the operating results achieved in 2016, events important to plant safety, special and relevant repair, and retrofit measures from nuclear power plants in Germany. Reports about nuclear power plants in Belgium, Finland, the Netherlands, Switzerland, and Spain will be published in a further issue.

  14. Safety of nuclear power plants: Operation. Safety requirements

    International Nuclear Information System (INIS)

    2004-01-01

    The safety of a nuclear power plant is ensured by means of its proper siting, design, construction and commissioning, followed by the proper management and operation of the plant. In a later phase, proper decommissioning is required. This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Operation, which was issued in 1988 as Safety Series No. 50-C-O (Rev. 1). The purpose of this revision was: to restructure Safety Series No. 50-C-O (Rev. 1) in the light of the basic objectives, concepts and principles in the Safety Fundamentals publication The Safety of Nuclear Installations. To be consistent with the requirements of the International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources. And to reflect current practice and new concepts and technical developments. Guidance on fulfillment of these Safety Requirements may be found in the appropriate Safety Guides relating to plant operation. The objective of this publication is to establish the requirements which, in the light of experience and the present state of technology, must be satisfied to ensure the safe operation of nuclear power plants. These requirements are governed by the basic objectives, concepts and principles that are presented in the Safety Fundamentals publication The Safety of Nuclear Installations. This publication deals with matters specific to the safe operation of land based stationary thermal neutron nuclear power plants, and also covers their commissioning and subsequent decommissioning

  15. Safety of nuclear power plants: Operation. Safety requirements

    International Nuclear Information System (INIS)

    2003-01-01

    The safety of a nuclear power plant is ensured by means of its proper siting, design, construction and commissioning, followed by the proper management and operation of the plant. In a later phase, proper decommissioning is required. This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Operation, which was issued in 1988 as Safety Series No. 50-C-O (Rev. 1). The purpose of this revision was: to restructure Safety Series No. 50-C-O (Rev. 1) in the light of the basic objectives, concepts and principles in the Safety Fundamentals publication The Safety of Nuclear Installations. To be consistent with the requirements of the International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources. And to reflect current practice and new concepts and technical developments. Guidance on fulfillment of these Safety Requirements may be found in the appropriate Safety Guides relating to plant operation. The objective of this publication is to establish the requirements which, in the light of experience and the present state of technology, must be satisfied to ensure the safe operation of nuclear power plants. These requirements are governed by the basic objectives, concepts and principles that are presented in the Safety Fundamentals publication The Safety of Nuclear Installations. This publication deals with matters specific to the safe operation of land based stationary thermal neutron nuclear power plants, and also covers their commissioning and subsequent decommissioning

  16. Safety of nuclear power plants: Operation. Safety requirements

    International Nuclear Information System (INIS)

    2000-01-01

    The safety of a nuclear power plant is ensured by means of its proper siting, design, construction and commissioning, followed by the proper management and operation of the plant. In a later phase, proper decommissioning is required. This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Operation, which was issued in 1988 as Safety Series No. 50-C-O (Rev. 1). The purpose of this revision was: to restructure Safety Series No. 50-C-O (Rev. 1) in the light of the basic objectives, concepts and principles in the Safety Fundamentals publication The Safety of Nuclear Installations; to be consistent with the requirements of the International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources; and to reflect current practice and new concepts and technical developments. Guidance on fulfillment of these Safety Requirements may be found in the appropriate Safety Guides relating to plant operation. The objective of this publication is to establish the requirements which, in the light of experience and the present state of technology, must be satisfied to ensure the safe operation of nuclear power plants. These requirements are governed by the basic objectives, concepts and principles that are presented in the Safety Fundamentals publication The Safety of Nuclear Installations. This publication deals with matters specific to the safe operation of land based stationary thermal neutron nuclear power plants, and also covers their commissioning and subsequent decommissioning

  17. Application of expert system to nuclear power plant operation and guidance system

    International Nuclear Information System (INIS)

    Goto, M.; Takada, Y.

    1990-01-01

    For a nuclear power plant, it is important that an expert system supplies useful information to the operator to meet the increasing demand for high-level plant operation. It is difficult to build a user-friendly expert system that supplies useful information in real time using existing general-purpose expert system shells. Therefore a domain-specific expert system shell with a useful knowledge representation for problem-solving in nuclear power plant operation was selected. The Plant Table (P/T) representation format was developed for description of a production system for nuclear power plant operation knowledge. The P/T consists of plant condition representation designed to process multiple inputs and single output. A large number of operation inputs for several plant conditions are divided into 'timing conditions', 'preconditions' and 'completion conditions' to facilitate knowledge-base build-up. An expert system for a Nuclear Power Plant Operation and Guidance System utilizing the P/T was developed to assist automatic plant operation and surveillance test operation. In these systems, automatic plant operation signals to the plant equipment and operation guidance messages to the operators are both output based on the processing and assessment of plant operation conditions by the P/T. A surveillance test procedure guide for major safety-related systems, such as those for emergency core cooling systems, is displayed on a CRT (Cathode Ray Tube) and test results are printed out. The expert system for a Nuclear Power Plant Operation and Guidance System has already been successfully applied to Japanese BWR plants

  18. Higher operational safety of nuclear power plants by evaluating the behaviour of operating personnel

    International Nuclear Information System (INIS)

    Mertins, M.; Glasner, P.

    1990-01-01

    In the GDR power reactors have been operated since 1966. Since that time operational experiences of 73 cumulative reactor years have been collected. The behaviour of operating personnel is an essential factor to guarantee the safety of operation of the nuclear power plant. Therefore a continuous analysis of the behaviour of operating personnel has been introduced at the GDR nuclear power plants. In the paper the overall system of the selection, preparation and control of the behaviour of nuclear power plant operating personnel is presented. The methods concerned are based on recording all errors of operating personnel and on analyzing them in order to find out the reasons. The aim of the analysis of reasons is to reduce the number of errors. By a feedback of experiences the nuclear safety of the nuclear power plant can be increased. All data necessary for the evaluation of errors are recorded and evaluated by a computer program. This method is explained thoroughly in the paper. Selected results of error analysis are presented. It is explained how the activities of the personnel are made safer by means of this analysis. Comparisons with other methods are made. (author). 3 refs, 4 figs

  19. Decontamination of operational nuclear power plants

    International Nuclear Information System (INIS)

    1981-06-01

    In order to reduce the radiation fields around nuclear power plants, and, consequently, to limit the radiation exposure of and dose commitments to the operating and maintenance personnel, the contamination build-up should be kept to a minimum. The most fruitful approach, from the point of view of economics and efficiency, is to tackle the problems of contamination and decontamination in the design and construction phases of the reactor. To do this, knowledge gained from the operation of existing power reactors should be used to make improvements in new designs. New structural materials with low corrosion rates or whose constituents are not activated by neutrons should also be used. For older reactors, in most cases it is already too late to incorporate design changes without extensive and expensive modifications. For these plants, decontamination remains the most efficient way to reduce radiation fields. The aim of this report is to deal with the different decontamination methods that may be applied to nuclear power plant circuits and equipment during operation. The factors that have to be considered in determining the type and the extent of the methods used are the engineering and the planning of the decontamination operation and the treatment of the resulting waste generated during the process are also discussed

  20. Selection/licensing of nuclear power plant operators

    International Nuclear Information System (INIS)

    Saari, L.M.

    1983-07-01

    An important aspect of nuclear power plant (NPP) safety is the reactor operator in the control room. The operators are the first individuals to deal with an emergency situation, and thus, effective performance on their part is essential for safe plant operations. Important issues pertaining to NPP reactor operators would fall within the personnel subsystem of our safety system analysis. While there are many potential aspects of the personnel subsystem, a key first step in this focus is the selection of individuals - attempting to choose individuals for the job of reactor operator who will safely perform the job. This requires a valid (job-related) selection process. Some background information on the Nuclear Regulatory Commission (NRC) licensing process used for selecting NPP reactor operators is briefly presented and a description of a research endeavor now underway at Battelle for developing a valid reactor operator licensing examination is included

  1. Evolution of the future plants operation for a better safety

    International Nuclear Information System (INIS)

    Papin, B.; Malvache, P.

    1994-01-01

    This paper describes a coordinated research project of the french CEA, addressing to the evolutions in plant operation apt to bring perceptible and assessable improvement in the operational safety. This program has been scheduled for the 1992-1996 period, with a global 40 men/year effort. The present status of the two main parts of the project is presented: ESCRIME (program aiming at defining the optimal share of tasks between humans and computers in plant operation), IMAGIN (research in the domain of plant information management, in order to ensure the global coherence of the image of the plant, used by the different actors in plant operation). (authors). 3 refs., 4 figs

  2. Development of a dynamic operation permission system to support operations in an anomalous situation of PWR plants

    International Nuclear Information System (INIS)

    Gofuku, Akio; Nishio, Takuya; Ohi, Tadashi; Ito, Koji

    2005-01-01

    This paper describes a proto-type dynamic operation permission system to avoid commission errors of operators. The system lies between CRT-based operation panels and plant control systems and checks an operation by operators if it follows typical operation procedure described in operation manuals and it has suitable effects on plant condition. The applicability of the proto-type system is demonstrated through the application to the recovery operations of a steam generator tube rupture accident of a three-loop pressurized water reactor plant

  3. Operating procedure automation to enhance safety of nuclear power plants

    International Nuclear Information System (INIS)

    Husseiny, A.A.; Sabri, Z.A.; Adams, S.K.; Rodriguez, R.J.; Packer, D.; Holmes, J.W.

    1989-01-01

    Use of logic statements and computer assist are explored as means for automation and improvement on design of operating procedures including those employed in abnormal and emergency situations. Operating procedures for downpower and loss of forced circulation are used for demonstration. Human-factors analysis is performed on generic emergency operating procedures for three strategies of control; manual, semi-automatic and automatic, using standard emergency operating procedures. Such preliminary analysis shows that automation of procedures is feasible provided that fault-tolerant software and hardware become available for design of the controllers. Recommendations are provided for tests to substantiate the promise of enhancement of plant safety. Adequate design of operating procedures through automation may alleviate several major operational problems of nuclear power plants. Also, automation of procedures is necessary for partial or overall automatic control of plants. Fully automatic operations are needed for space applications while supervised automation of land-based and offshore plants may become the thrust of new generation of nulcear power plants. (orig.)

  4. Operation reports of nuclear power plants

    International Nuclear Information System (INIS)

    1983-01-01

    The requirements aiming to standardize the program of nuclear power plant operation report, required by Brazilian Energy Commission - CNEN - to evaluate the activities related to the nuclear technical safety and to the radiation protection during the units operational phase, are showed. (E.G.) [pt

  5. Operational safety of nuclear power plants

    International Nuclear Information System (INIS)

    Tanguy, P.

    1987-01-01

    The operational safety of nuclear power plants has become an important safety issue since the Chernobyl accident. A description is given of the various aspects of operational safety, including the importance of human factors, responsibility, the role and training of the operator, the operator-machine interface, commissioning and operating procedures, experience feedback, and maintenance. The lessons to be learnt from Chernobyl are considered with respect to operator errors and the management of severe accidents. Training of personnel, operating experience feedback, actions to be taken in case of severe accidents, and international cooperation in the field of operational safety, are also discussed. (U.K.)

  6. Commissioning and Operational Experience in Power Reactor Fuel Reprocessing Plant

    Energy Technology Data Exchange (ETDEWEB)

    Pradhan, S., E-mail: spradhan@barctara.gov.in [Tarapur Based Reprocessing Plant, Bhabha Atomic Research Centre, Tarapur (India)

    2014-10-15

    After completing design, construction, commissioning, operation and maintenance experience of the reprocessing plants at Tarapur, Mumbai and Kalpakkam a new reprocessing plant is commissioned and put into operation at BARC, Tarapur since 2011. Subsequent to construction clearance, commissioning of the plant is taken in many steps with simultaneous review by design and safety committees. In spite of vast experience, all the staff was retrained in various aspects of process and utility operations and in operation of innovative changes incorporated in the design. Operating personnel are licensed through an elaborate procedure consisting of various check lists followed by personnel interview. Commissioning systems were divided in sub-systems. Sub-systems were commissioned independently and later integrated testing was carried out. For commissioning, extreme operating conditions were identified in consultation with designers and detailed commissioning procedures were made accordingly. Commissioning was done in different conditions to ensure safety, smooth operation and maintainability. Few modifications were carried out based on commissioning experience. Technical specifications for operation of the plant are made in consultation with designers and reviewed by safety committees. Operation of the plant was carried out after successful commissioning trials with Deep Depleted Uranium (DDU). Emergency operating procedures for each design basis accident were made. Performance of various systems, subsystems are quite satisfactory and the plant has given very good capacity factor. (author)

  7. Increase of hydroelectric power plant operation reliability

    International Nuclear Information System (INIS)

    Koshumbaev, M.B.

    2006-01-01

    The new design of the turbine of hydroelectric power plant (HPP) is executed in the form of a pipe with plates. Proposed solution allows increasing the hydroelectric power plant capacity at existing head and water flow. At that time the HPP turbine reliability is increase, its operation performances are improving. Design efficiency is effective mostly for small-scale and micro-HPP due to reliable operation, low-end technology, and harmless ecological application. (author)

  8. Typical IAEA operations at a fuel fabrication plant

    International Nuclear Information System (INIS)

    Morsy, S.

    1984-01-01

    The IAEA operations performed at a typical Fuel Fabrication Plant are explained. To make the analysis less general the case of Low Enriched Uranium (LEU) Fuel Fabrication Plants is considered. Many of the conclusions drawn from this analysis could be extended to other types of fabrication plants. The safeguards objectives and goals at LEU Fuel Fabrication Plants are defined followed by a brief description of the fabrication process. The basic philosophy behind nuclear material stratification and the concept of Material Balance Areas (MBA's) and Key Measurement Points (KMP's) is explained. The Agency operations and verification methods used during physical inventory verifications are illustrated

  9. Improving plant state information for better operational safety

    International Nuclear Information System (INIS)

    Girard, C.; Olivier, E.; Grimaldi, X.

    1994-01-01

    Nuclear Power Plant (NPP) safety is strongly dependent on components' reliability and particularly on plant state information reliability. This information, used by the plant operators in order to produce appropriate actions, have to be of a high degree of confidence, especially in accidental conditions where safety is threatened. In this perspective, FRAMATOME, EDF and CEA have started a joint research program to prospect different solutions aiming at a better reliability for critical information needed to safety operate the plant. This paper gives the main results of this program and describes the developments that have been made in order to assess reliability of different information systems used in a Nuclear Power Plant. (Author)

  10. Research of the Power Plant Operational Modes

    Directory of Open Access Journals (Sweden)

    Koismynina Nina M.

    2017-01-01

    Full Text Available In this article the algorithm of the power plant operational modes research is offered. According to this algorithm the program for the modes analysis and connection power transformers choice is developed. The program can be used as educational means for studying of the power plant electric part, at the same time basic data are provided. Also the program can be used for the analysis of the working power plants modes. Checks of the entered data completeness and a choice correctness of the operational modes are provided in the program; in all cases of a deviation from the correct decisions to the user the relevant information is given.

  11. Operating experience with nuclear power plants 2013; Betriebserfahrungen mit Kernkraftwerken 2013

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2014-07-01

    The VGB Technical Committee 'Nuclear Plant Operation' has been exchanging operating experience about nuclear power plants for more than 30 years. Plant operators from several European countries are participating in the exchange. A report is given on the operating results achieved in 2013, events important to plant safety, special and relevant repair, and retrofit measures from Belgium, Germany, Finland, the Netherlands, Switzerland, and Spain. (orig.)

  12. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1991-08-01

    In the Quarterly Reports on the operation of the Finnish nuclear power plants such events and observations are described relating to nuclear and radiation safety which the Finnish Centre for Radiation and Nuclear Safety considers safety significant. Also other events of general interest are reported. The report also includes a summary of the radiation safety of the plants' workers and the environment, as well as tabulated data on the production and load factors of the plants. The Finnish nuclear power plant units Loviisa 1 and 2 as well as TVO I and II were in commercial operation during the whole first quarter of 1991. The load factor average was 99.1 %. Failures have been detected in the uppermost spacing lattices of nuclear fuel bundles removed from the Loviisa nuclear reactors. Further investigations into the significance of the failures have been initiated. In this quarter, renewed cooling systems for the instrumentation area were introduced at Loviisa 1. The modifications made in the systems serve to ensure reliable cooling of the area even during the hottest summer months when the possibility exists that the temperature of the automation equipment could rise too high causing malfunctions which could endanger plant safety. Occupational radiation doses and external releases of radioactivity were below prescribed limits in this quarter. Only small amounts of radioactive substances originating in nuclear power plants were detected in samples taken in the vicinity of nuclear power plants

  13. Integrated Life Cycle Management: A Strategy for Plants to Extend Operating Lifetimes Safely with High Operational Reliability

    International Nuclear Information System (INIS)

    Esselman, Thomas; Bruck, Paul; Mengers, Charles

    2012-01-01

    Nuclear plant operators are studying the possibility of extending their existing generating facilities operating lifetime to 60 years and beyond. Many nuclear plants have been granted licenses to operate their facilities beyond the original 40 year term; however, in order to optimize the long term operating strategies, plant decision-makers need a consistent approach to support their options. This paper proposes a standard methodology to support effective decision-making for the long-term management of selected station assets. Methods detailed are intended to be used by nuclear plant site management, equipment reliability personnel, long term planners, capital asset planners, license renewal staff, and others that intend to look at operation between the current time and the end of operation. This methodology, named Integrated Life Cycle Management (ILCM), will provide a technical basis to assist decision makers regarding the timing of large capital investments required to get to the end of operation safely and with high plant reliability. ILCM seeks to identify end of life cycle failure probabilities for individual plant large capital assets and attendant costs associated with their refurbishment or replacement. It will provide a standard basis for evaluation of replacement and refurbishment options for these components. ILCM will also develop methods to integrate the individual assets over the entire plant thus assisting nuclear plant decision-makers in their facility long term operating strategies. (author)

  14. Kursk ASSET brings praise for plant operators

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    An Assessment of Safety Significant Events Team (ASSET) from the International Atomic Energy Agency (IAEA) visited Kursk on 19-31 July 1992 - the first time such a group had been to a RBMK reactor site. Kursk is a four unit station and the IAEA Team was able to consider safety significant events over its 45 reactor-year history. all four units have good operating records, with lifetime load factors of 70-80%. The ASSET's aim was to consider the plants current safety provisions for prevention of accidents and incidents. ASSET recommendations may cover the design and operability of the plant, personnel or operating procedures. At Kursk the Team found that ''highly qualified plant management and a very dedicated and knowledgeable operating staff'' was a major asset. They found a sound maintenance programme although some aspects of the facility appeared neglected. This was attributed to Russian industrial priorities that focused on functionality rather than appearance. it was in the test and maintenance personnel that the ASSET mission found the safety culture weakest. Some of their recommendations are reported in this article. (Author)

  15. Quality assurance during operation of nuclear power plants

    International Nuclear Information System (INIS)

    1994-01-01

    The general requirements applicable to the quality assurance of the Finnish nuclear power plants are presented in the Council of State Decision (395/91) and in the guide YVL 1.4. This guide specifies the quality assurance requirements to be applied during the operation of the nuclear power plants as well as of the other nuclear facilities. Quality assurance applies to all the activities and organizations with a bearing on the safe operation of the nuclear power plants. (5 refs.)

  16. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1991-02-01

    During the third quarter of 1990 the Finnish nuclear power plant units Loviisa 1 and 2 and TVO I and II were in commercial operation for most of the time. The annual maintenance outages of the Loviisa plant units were held during the report period. All events during this quarter are classified as Level hero (Below Scale) on the International Nuclear Event Scale. Occupational radiation doses and external releases of radioactivity were below authorised limits. Only small amounts of radioactive substances originating in nuclear power plants were detected in samples taken in the vicinity of nuclear power plants

  17. Operator involvement in plant decision making and self-assessment

    International Nuclear Information System (INIS)

    Dugwyler, R.L.

    1993-04-01

    The Fast Flux Test Facility has a history of innovation that goes beyond mere compliance with DOE Conduct of Operations. This innovation fosters excellence at all levels of daily operations. Consistent operator input into management decision making and self-assessment has helped to produce an Operations staff that is proud and professional. A group of operators drafted the Fast Flux Test Facility Operations Professional Code, which serves as a benchmark for excellence. Operator committees have proposed changes as varied as the twelve hour rotating shift schedule, a streamlined reactor operator qualification program and an improved new hire training process. The changes succeeded because they had widespread operator acceptance. Similar committees have initiated staffing and qualification changes to help Operations cope with transforming the plant from an operating to a standby status. Standing committees such as the Operations Review Team (1985 to 1988) and the Operations Performance Enhancement Committee (1990 to present) have provided operators with an independent review of root causes and corrective actions to events. This occurs both for in-plant and other DOE facility events, through a Lessons Learned Program. The committees have also had open-quotes management's earclose quotes regarding suggestions for improving safety, efficiency and operator performance. As the Fast Flux Test Facility goes from an operating plant to a plant in standby, one of the primary changes will be to maintain operator interest in continual improvement. The Operations Performance Enhancement Committee can assist in this pursuit -- a pursuit of excellence. The purpose of this paper is to relate the successes of operator involvement at the Fast Flux Test Facility from the viewpoint of an Operations Engineer

  18. Maximal multiplier operators in Lp(·)(Rn) spaces

    Czech Academy of Sciences Publication Activity Database

    Gogatishvili, Amiran; Kopaliani, T.

    2016-01-01

    Roč. 140, č. 4 (2016), s. 86-97 ISSN 0007-4497 R&D Projects: GA ČR GA13-14743S Institutional support: RVO:67985840 Keywords : spherical maximal function * variable Lebesque spaces * boundedness result Subject RIV: BA - General Mathematics Impact factor: 0.750, year: 2016 http://www.sciencedirect.com/science/article/pii/S0007449715000329

  19. Safety of Nuclear Power Plants: Commissioning and Operation (Spanish Edition)

    International Nuclear Information System (INIS)

    2012-01-01

    This publication is a revision of Safety Requirements No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe operation of nuclear power plants. Over recent years there have been developments in areas such as long term operation, plant ageing, periodic safety review, probabilistic safety analysis and risk informed decision making processes. It became necessary to revise the IAEA's safety requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the Fundamental Safety Principles. Contents: 1. Introduction; 2. Safety objectives and principles; 3. The management and organizational structure of the operating organization; 4. Management of operational safety; 5. Operational safety programmes; 6. Plant commissioning; 7. Plant operations; 8. Maintenance, testing, surveillance and inspection; 9. Preparation for decommissioning.

  20. Safety of Nuclear Power Plants: Commissioning and Operation (French Edition)

    International Nuclear Information System (INIS)

    2012-01-01

    This publication is a revision of Safety Requirements No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe operation of nuclear power plants. Over recent years there have been developments in areas such as long term operation, plant ageing, periodic safety review, probabilistic safety analysis and risk informed decision making processes. It became necessary to revise the IAEA's safety requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the Fundamental Safety Principles. Contents: 1. Introduction; 2. Safety objectives and principles; 3. The management and organizational structure of the operating organization; 4. Management of operational safety; 5. Operational safety programmes; 6. Plant commissioning; 7. Plant operations; 8. Maintenance, testing, surveillance and inspection; 9. Preparation for decommissioning.

  1. Safety of Nuclear Power Plants: Commissioning and Operation. Arabic Edition

    International Nuclear Information System (INIS)

    2011-01-01

    This publication is a revision of Safety Requirements No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe operation of nuclear power plants. Over recent years there have been developments in areas such as long term operation, plant ageing, periodic safety review, probabilistic safety analysis and risk informed decision making processes. It became necessary to revise the IAEA's safety requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the Fundamental Safety Principles. Contents: 1. Introduction; 2. Safety objectives and principles; 3. The management and organizational structure of the operating organization; 4. Management of operational safety; 5. Operational safety programmes; 6. Plant commissioning; 7. Plant operations; 8. Maintenance, testing, surveillance and inspection; 9. Preparation for decommissioning.

  2. Factor best of ALWR features into operating plants

    International Nuclear Information System (INIS)

    Strauss, S.D.

    1997-01-01

    This article describes how many features of advanced light-water reactor designs are applicable to existing plants. While no new plants are being ordered, some advanced features have found their way into existing units and have been incorporated into the design of plants being built overseas. Ironically, two of the advanced light-water reactor (ALWR) plant designs--the ABWR and the System 80+--were finally approved by the US Nuclear Regulatory Commission (NRC) at the end of last year. Yet US utilities are probably further away from ordering a new nuclear unit than they ever have been. But that doesn't make the program irrelevant. Design advances from this program can affect the economics of nuclear power at a time when owner/operators are striving to compete in a less restrictive market for generation. Advances that can be considered by operating plants emanate from two major programs: (1) the standard plant designs which began in the late 1970s and (2) the ALWR program which sought--successfully, although it took a decade--to precertify designs and lessen the licensing burden on those contemplating a new unit. By using proven technology to simplify plants with higher design margins and enhanced safety features, the ALWR program's goal was to make new plants less expensive, safer, and easier to operate and maintain than their predecessors

  3. Computer visualization for enhanced operator performance for advanced nuclear power plants

    International Nuclear Information System (INIS)

    Simon, B.H.; Raghavan, R.

    1993-01-01

    The operators of nuclear power plants are presented with an often uncoordinated and arbitrary array of displays and controls. Information is presented in different formats and on physically dissimilar instruments. In an accident situation, an operator must be very alert to quickly diagnose and respond to the state of the plant as represented by the control room displays. Improvements in display technology and increased automation have helped reduce operator burden; however, too much automation may lead to operator apathy and decreased efficiency. A proposed approach to the human-system interface uses modern graphics technology and advances in computational power to provide a visualization or ''virtual reality'' framework for the operator. This virtual reality comprises a simulated perception of another existence, complete with three-dimensional structures, backgrounds, and objects. By placing the operator in an environment that presents an integrated, graphical, and dynamic view of the plant, his attention is directly engaged. Through computer simulation, the operator can view plant equipment, read local displays, and manipulate controls as if he were in the local area. This process not only keeps an operator involved in plant operation and testing procedures, but also reduces personnel exposure. In addition, operator stress is reduced because, with realistic views of plant areas and equipment, the status of the plant can be accurately grasped without interpreting a large number of displays. Since a single operator can quickly ''visit'' many different plant areas without physically moving from the control room, these techniques are useful in reducing labor requirements for surveillance and maintenance activities. This concept requires a plant dynamic model continuously updated via real-time process monitoring. This model interacts with a three-dimensional, solid-model architectural configuration of the physical plant

  4. Violating Bell inequalities maximally for two d-dimensional systems

    International Nuclear Information System (INIS)

    Chen Jingling; Wu Chunfeng; Oh, C. H.; Kwek, L. C.; Ge Molin

    2006-01-01

    We show the maximal violation of Bell inequalities for two d-dimensional systems by using the method of the Bell operator. The maximal violation corresponds to the maximal eigenvalue of the Bell operator matrix. The eigenvectors corresponding to these eigenvalues are described by asymmetric entangled states. We estimate the maximum value of the eigenvalue for large dimension. A family of elegant entangled states |Ψ> app that violate Bell inequality more strongly than the maximally entangled state but are somewhat close to these eigenvectors is presented. These approximate states can potentially be useful for quantum cryptography as well as many other important fields of quantum information

  5. Generalized Yosida Approximations Based on Relatively A-Maximal m-Relaxed Monotonicity Frameworks

    Directory of Open Access Journals (Sweden)

    Heng-you Lan

    2013-01-01

    Full Text Available We introduce and study a new notion of relatively A-maximal m-relaxed monotonicity framework and discuss some properties of a new class of generalized relatively resolvent operator associated with the relatively A-maximal m-relaxed monotone operator and the new generalized Yosida approximations based on relatively A-maximal m-relaxed monotonicity framework. Furthermore, we give some remarks to show that the theory of the new generalized relatively resolvent operator and Yosida approximations associated with relatively A-maximal m-relaxed monotone operators generalizes most of the existing notions on (relatively maximal monotone mappings in Hilbert as well as Banach space and can be applied to study variational inclusion problems and first-order evolution equations as well as evolution inclusions.

  6. Evaluation of nuclear power plant operator's ability

    International Nuclear Information System (INIS)

    Wei Li; He Xuhong; Zhao Bingquan

    2004-01-01

    Based on the quantitative research on nuclear power plant (NPP) operator's psychological characteristics and performance, the Borda's method of fuzzy mathematics combined with the character of operator's task is used to evaluate their abilities. The result provides the reference for operator's reliability research and psychological evaluation. (author)

  7. The safety approach in the operation of EDF power plants

    International Nuclear Information System (INIS)

    Bertron, L.; Mira, J.J.

    1988-01-01

    To get a view on what is involved in maintaining a high level of safety in the operation of EdF nuclear power plants, it may be recalled that in 1987, 76 % of the EdF production was nuclear. The nuclear plants include thirty-four standard PWR 900 plants, fourteen PWR 1300 plants, the 305 MW SENA PWR, the four 500 MW GCR: CHINON A3 plant, St-LAURENT A1 (390 MW), A2 (450 MW) and BUGEY 1 (540 MW), the 233 MW PHENIX fast breeder reactor and the CREYS-MALVILLE 1200 MW fast breeder reactor, now being prepared for a new startup after the 1987 incident. So the importance of a safe operation of this investment is considerable for EdF, which is the designer, owner, industrial architect and operator. According to the French regulations, EdF is responsible for the safe operation of its power plants. A considerable human component is also at stake, as the safe operation of plants implies all the personnel to varying degrees. There are 15,000 such employees, all of whom have to be trained, competent and motivated. The operation of this system for 340 reactor-years has to-date resulted in no incident of any significant impact on the environment. Right from the start, safety in operation has always been an essential and clearly stated priority. Among other lessons the Three-Mile Island and Chernobyl accidents have reinforced the conviction that the human factors, the man-machine interface, and the safety culture were determining elements. With forty-eigh PWR plants in service, the problem is to maintain safe operation of a system now running at cruising speed, but also including some units (particularly the GCRs) that must be prepared for decommissioning. In addition EDF has to demonstrate the safe operations of CREYS MALVILLE, fast breeder reactor

  8. Optimization of the weekly operation of a multipurpose hydroelectric development, including a pumped storage plant

    International Nuclear Information System (INIS)

    Popa, R; Popa, B; Popa, F; Zachia-Zlatea, D

    2010-01-01

    It is presented an optimization model based on genetic algorithms for the operation of a multipurpose hydroelectric power development consisting in a pumped storage plant (PSP) with weekly operation cycle. The lower reservoir of the PSP is supplied upstream from a peak hydropower plant (HPP) with a large reservoir and supplies the own HPP which provides the required discharges towards downstream. Under these conditions, the optimum operation of the assembly consisting in 3 reservoirs and hydropower plants becomes a difficult problem if there are considered the restrictions as regards: the gradients allowed for the reservoirs filling/emptying, compliance with of a long-term policy of the upper reservoir from the hydroelectric development and of the weekly cycle for the PSP upper reservoir, correspondence between the power output/consumption in the weekly load schedule, turning to account of the water resource at maximum overall efficiencies, etc. Maximization of the net energy value (generated minus consumed) was selected as performance function of the model, considering the differentiated price of the electric energy over the week (working or weekend days, peak, half-peak or base hours). The analysis time step was required to be of 3 hours, resulting a weekly horizon of 56 steps and 168 decision variables, respectively, for the 3 HPPs of the system. These were allowed to be the flows turbined at the HPP and the number of working hydrounits at PSP, on each time step. The numerical application has considered the guiding data of Fantanele-Tarnita-Lapustesti hydroelectric development. Results of various simulations carried out proved the qualities of the proposed optimization model, which will allow its use within a decisional support program for such a development.

  9. Optimization of the weekly operation of a multipurpose hydroelectric development, including a pumped storage plant

    Energy Technology Data Exchange (ETDEWEB)

    Popa, R; Popa, B [Faculty of Power Engineering, University Politehnica of Bucharest, 313 Spl. Independentei, sect. 6, Bucharest, 060042 (Romania); Popa, F [Institute for Hydropower Studies and Design, 5-7 Vasile Lascar, sect. 2, Bucharest, 020491 (Romania); Zachia-Zlatea, D, E-mail: bogdan.popa@rosha.r [Hidroelectrica S.A., 3 Constantin Nacu, sect. 2, Bucharest, 020995 (Romania)

    2010-08-15

    It is presented an optimization model based on genetic algorithms for the operation of a multipurpose hydroelectric power development consisting in a pumped storage plant (PSP) with weekly operation cycle. The lower reservoir of the PSP is supplied upstream from a peak hydropower plant (HPP) with a large reservoir and supplies the own HPP which provides the required discharges towards downstream. Under these conditions, the optimum operation of the assembly consisting in 3 reservoirs and hydropower plants becomes a difficult problem if there are considered the restrictions as regards: the gradients allowed for the reservoirs filling/emptying, compliance with of a long-term policy of the upper reservoir from the hydroelectric development and of the weekly cycle for the PSP upper reservoir, correspondence between the power output/consumption in the weekly load schedule, turning to account of the water resource at maximum overall efficiencies, etc. Maximization of the net energy value (generated minus consumed) was selected as performance function of the model, considering the differentiated price of the electric energy over the week (working or weekend days, peak, half-peak or base hours). The analysis time step was required to be of 3 hours, resulting a weekly horizon of 56 steps and 168 decision variables, respectively, for the 3 HPPs of the system. These were allowed to be the flows turbined at the HPP and the number of working hydrounits at PSP, on each time step. The numerical application has considered the guiding data of Fantanele-Tarnita-Lapustesti hydroelectric development. Results of various simulations carried out proved the qualities of the proposed optimization model, which will allow its use within a decisional support program for such a development.

  10. Maximization of Egyptian Gas Oil Production Through the Optimal Use of the Operating Parameters

    International Nuclear Information System (INIS)

    Marawan, H.

    2004-01-01

    Gas oil is the major fossil fuel consumed around the world. Global gas oil consumption is rising at a steadily fast pace because of its higher combustion efficiency (versus gasoline). The annual increase rate of gas oil consumption in Egypt is 7 % whereas, the world increase rates range from 1.5 % to 2 % . The main sources for producing gas oil in Egypt refiners is the direct production from the atmospheric distillation process units or it may be produced as a side product from vacuum distillation units . Gas oil is produced through hydrocracking process of vacuum distillation side streams and heavy cocked gas oil. Gas oil production yield can be increased through the existing operation process units. Modifications of the current atmospheric and vacuum tower operations will increase gas oil yield rates to 20 % more than the existing production rates. The modification of the operating conditions and adoption of the optimum catalyst of the existing hydrocracking and mild hydro cracking process units improve gas oil production yield. Operating delayed cocker at high temperatures, low pressure and low cycle ratio also support achieving the maximization of gas oil yield

  11. Themoeconomic optimization of triple pressure heat recovery steam generator operating parameters for combined cycle plants

    Directory of Open Access Journals (Sweden)

    Mohammd Mohammed S.

    2015-01-01

    Full Text Available The aim of this work is to develop a method for optimization of operating parameters of a triple pressure heat recovery steam generator. Two types of optimization: (a thermodynamic and (b thermoeconomic were preformed. The purpose of the thermodynamic optimization is to maximize the efficiency of the plant. The selected objective for this purpose is minimization of the exergy destruction in the heat recovery steam generator (HRSG. The purpose of the thermoeconomic optimization is to decrease the production cost of electricity. Here, the total annual cost of HRSG, defined as a sum of annual values of the capital costs and the cost of the exergy destruction, is selected as the objective function. The optimal values of the most influencing variables are obtained by minimizing the objective function while satisfying a group of constraints. The optimization algorithm is developed and tested on a case of CCGT plant with complex configuration. Six operating parameters were subject of optimization: pressures and pinch point temperatures of every three (high, intermediate and low pressure steam stream in the HRSG. The influence of these variables on the objective function and production cost are investigated in detail. The differences between results of thermodynamic and the thermoeconomic optimization are discussed.

  12. Role of conceptual models in nuclear power plant operation

    International Nuclear Information System (INIS)

    Williams, M.D.; Moran, T.P.; Brown, J.S.

    1982-01-01

    A crucial objective in plant operation (and perhaps licensing) ought to be to explicitly train operators to develop, perhaps with computer aids, robust conceptual models of the plants they control. The question is whether we are actually able to develop robust conceptual models and validate their robustness. Cognitive science is just beginning to come to grips with this problem. This paper describes some of the evolving technology for building conceptual models of physical mechanisms and some of the implications of such models in the context of nuclear power plant operation

  13. Advanced maintenance strategies for power plant operators--introducing inter-plant life cycle management

    International Nuclear Information System (INIS)

    Graeber, Ulrich

    2004-01-01

    One of the most important goals of competing power plant operators is to ensure safe operation of their plants, characterized by maximum availability throughout the entire life cycle and minimized specific generating costs. One parameter crucial to the total price of electricity--and one that can be actively influenced by the power plant operators--is maintenance. Up to 30% of all electricity generating costs accrue from maintenance. In the past years maintenance measures have been optimized particularly by the application and continuing development of testing and diagnostic techniques, by the increased level of system and component automation as well as more efficient organization structures. Despite the considerable success of these efforts, the potential for further cost reductions is still far from exhausted. But the risks connected to reliability, availability and safety need to be analyzed in greater detail in order to ensure the sustainability of the savings already achieved as well as those yet to be realized. The systematic application of condition-based maintenance and the implementation of structured life cycle management are essential requirements. An inter-plant approach is recommended to make a quick implementation of maintenance optimization potentials possible. Plant-specific improvement potentials can be established with the help of a best-practice comparison, and measures and priorities can be defined for realizing them. Creating an inter-plant database will allow experience and findings to be analyzed quickly and efficiently by experts and made available to all participants on a neutral platform. Despite--or maybe owing to--the increasingly competitive marketplace, a sustained reduction in the maintenance costs of power plant operators can only be achieved through a structured, inter-plant exchange of experience. The ZES offers the industry a suitable platform for cooperation with its 'Condition-Based Maintenance' research focus. The introduction

  14. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1994-03-01

    In the third quarter of 1993, all of Finland's four nuclear power plant units were in power operation, with the exception of the annual maintenance outages of the Loviisa units. The load factor average of the plant units was 83.6 %. None of the events which occurred during this annual quarter had any bearing on nuclear or radiation safety. (4 figs., 5 tabs.)

  15. 20 years' operation of the Rheinsberg nuclear power plant

    International Nuclear Information System (INIS)

    Lehmann, R.; Quasniczka, H.; Fiss, W.; Hentschel, G.; Schulz, K.D.

    1986-01-01

    After a 20 years' operation of the Rheinsberg nuclear power plant a review of the operating results achieved, performance of the main equipment, research and development works performed, and experience gained with education and training of plant staff is given. (author)

  16. Conduct of Operations at Nuclear Power Plants. Safety Guide (Spanish Edition)

    International Nuclear Information System (INIS)

    2012-01-01

    This Safety Guide identifies the main responsibilities and practices of nuclear power plant (NPP) operations departments in relation to their responsibility for the safe functioning of the plant. The guide presents the factors to be considered in structuring the operations department of an NPP; setting high standards of performance; making safety related decisions in an effective manner; conducting control room and field activities in a thorough and professional manner; and maintaining an NPP within established operational limits and conditions. Contents: 1. Introduction; 2. Management and organization of plant operations; 3. Shift complement and functions; 4. Shift routines and operating practices; 5. Control of equipment and plant status; 6. Operations equipment and operator aids; 7. Work control and authorization.

  17. Use of computer codes to improve nuclear power plant operation

    International Nuclear Information System (INIS)

    Misak, J.; Polak, V.; Filo, J.; Gatas, J.

    1985-01-01

    For safety and economic reasons, the scope for carrying out experiments on operational nuclear power plants (NPPs) is very limited and any changes in technical equipment and operating parameters or conditions have to be supported by theoretical calculations. In the Nuclear Power Plant Scientific Research Institute (NIIAEhS), computer codes are systematically used to analyse actual operating events, assess safety aspects of changes in equipment and operating conditions, optimize the conditions, preparation and analysis of NPP startup trials and review and amend operating instructions. In addition, calculation codes are gradually being introduced into power plant computer systems to perform real time processing of the parameters being measured. The paper describes a number of specific examples of the use of calculation codes for the thermohydraulic analysis of operating and accident conditions aimed at improving the operation of WWER-440 units at the Jaslovske Bohunice V-1 and V-2 nuclear power plants. These examples confirm that computer calculations are an effective way of solving operating problems and of further increasing the level of safety and economic efficiency of NPP operation. (author)

  18. Operating-procedure system at Savannah River Plant

    International Nuclear Information System (INIS)

    Tope, C.W.

    1981-05-01

    Three types of procedures are widely used at SRP: Du Pont Savannah Operating Logsheet, Du Pont Savannah Operating Procedure, and Plant Manual. This document briefly reviews originating of the procedures, their preparation, control, and indexing

  19. Training and qualification of nuclear power plant operators

    International Nuclear Information System (INIS)

    Ohsuga, Y.

    2008-01-01

    Based on training experiences of the nuclear power plant operators of pressurized water reactors (PWR) at the Nuclear Power Training Center Ltd. (NTC) in Japan, training programs were reviewed referring to US training programs. A systematic approach is deployed to them, which mainly consist of on-the-job training and the NTC training courses to meet the needs of all operators from beginners to experienced veterans according to their experiences and objectives. The NTC training is conducted using the simulators that simulate the nuclear power plant dynamics through the use of computers. The operators trained at the NTC work in the central control room of every PWR power plant. The NTC also carries out the qualification examinations for the shift managers. (T. Tanaka)

  20. Nuclear power plant licensing in Canada

    International Nuclear Information System (INIS)

    Tong, J.S.C.; Waddington, J.G.

    1997-01-01

    The Canadian nuclear power plant licensing practice which has evolved over three decades provides a regulatory framework that promotes safe design and operation of CANDU power plants. From the very outset, it recognizes the need for simple and reliable safety systems which are separate from the systems that are normally used to produce electricity. Further, it requires the reliability of safety systems be demonstrated by routine tests during plant operation. Over the three decades, the analysis requirements to demonstrate the performance and reliability of plant systems that have a role in the detection and mitigating of accidents have also evolved. Today's requirements are defined in consultative documents C-6 and C-98. One recurring theme throughout the evolution of the licensing practice is the maxim of prescribing only basic safety requirements and rules so that designers and operators have the freedom to devise the best possible design features and operating practices

  1. Reliability research to nuclear power plant operators based on several methods

    International Nuclear Information System (INIS)

    Fang Xiang; Li Fu; Zhao Bingquan

    2009-01-01

    The paper utilizes many kinds of international reliability research methods, and summarizes the review of reliability research of Chinese nuclear power plant operators in past over ten years based on the simulator platform of nuclear power plant. The paper shows the necessity and feasibility of the research to nuclear power plant operators from many angles including human cognition reliability, fuzzy mathematics model and psychological research model, etc. It will be good to the safe operation of nuclear power plant based on many kinds of research methods to the reliability research of nuclear power plant operators. (authors)

  2. A methodology for nuclear power plant operational events evaluation

    International Nuclear Information System (INIS)

    Araujo, Jeferson

    2015-01-01

    Operational events are normal occurrences in industrial plants and in nuclear power plants. The evaluation of operational events gains importance when it comes specifically to nuclear power plants due to the proportions that the impact and the consequences of these events may cause to the installation itself, their workers, the external area of the nuclear installation, the environment and to the public in general. These consequences, for the operation of these facilities can range from very little, until the consequences that lead to accidents and can cause significant impacts. Operational events may be associated or have influence in many fields of knowledge, such as operation, maintenance, engineering, Radiological Protection, physical protection, chemistry, Human or Organizational Factors and external events, among others. The accident at the Fukushima Daichi nuclear power plant, shows the importance of exhausting all the studies concerning operational events in order to improve the operational safety of nuclear plants, considering all the causes and possible consequences. In this context, the evaluation of operational events discipline emerges as an important and relevant tool to contribute to the maintenance and/or improvement of the operational safety of nuclear installations. Not without reason the nuclear industry actively participates in programs of exchange of operational experience, where relevant events are thoroughly evaluated and discussed in specific forums, such as power plant operators, regulators and/or joint technical meetings, always with the purpose to prevent, minimize or mitigate its consequences. Any evaluation of operational events passes necessarily by an in-depth study of the circumstances of the event, culminating with the identification of your cause and proposition of corrective actions to prevent recurrence of similar events. Additionally, the events should not be studied individually, but evaluated within a temporal context in order

  3. A methodology for nuclear power plant operational events evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Araujo, Jeferson, E-mail: jeferson@cnen.gov.br [Comissao Nacional de Energia Nuclear (CGRC/CNEN), Rio de janeiro, RJ (Brazil). Coordenacao Geral de Reatores e do Ciclo de Combustivel; Costa, Sergio Dias, E-mail: sergiodiascosta@hotmail.com [Instituto de Engenharia Nuclear (IEN/CNEN-RJ), Rio de Janeiro, RJ (Brazil)

    2015-07-01

    Operational events are normal occurrences in industrial plants and in nuclear power plants. The evaluation of operational events gains importance when it comes specifically to nuclear power plants due to the proportions that the impact and the consequences of these events may cause to the installation itself, their workers, the external area of the nuclear installation, the environment and to the public in general. These consequences, for the operation of these facilities can range from very little, until the consequences that lead to accidents and can cause significant impacts. Operational events may be associated or have influence in many fields of knowledge, such as operation, maintenance, engineering, Radiological Protection, physical protection, chemistry, Human or Organizational Factors and external events, among others. The accident at the Fukushima Daichi nuclear power plant, shows the importance of exhausting all the studies concerning operational events in order to improve the operational safety of nuclear plants, considering all the causes and possible consequences. In this context, the evaluation of operational events discipline emerges as an important and relevant tool to contribute to the maintenance and/or improvement of the operational safety of nuclear installations. Not without reason the nuclear industry actively participates in programs of exchange of operational experience, where relevant events are thoroughly evaluated and discussed in specific forums, such as power plant operators, regulators and/or joint technical meetings, always with the purpose to prevent, minimize or mitigate its consequences. Any evaluation of operational events passes necessarily by an in-depth study of the circumstances of the event, culminating with the identification of your cause and proposition of corrective actions to prevent recurrence of similar events. Additionally, the events should not be studied individually, but evaluated within a temporal context in order

  4. Unmanned operation of Hydro Power Plants

    International Nuclear Information System (INIS)

    Regula, E.

    2008-01-01

    Intentions to launch unmanned operation are no news, the very first occurred in Hydro Power Plants (HPP) at the time when the first computer technology was implemented into process of power generation, i.e. no later than in 1960 s . ENEL entering Slovenske elektrarne not only revived but significantly accelerated the implementation process of unmanned operation. Experience of ENEL says that unmanned operation means better reliability of the HPP and this is the priority. (author)

  5. ESCRIME: testing bench for advanced operator workstations in future plants

    International Nuclear Information System (INIS)

    Poujol, A.; Papin, B.

    1994-01-01

    The problem of optimal task allocation between man and computer for the operation of nuclear power plants is of major concern for the design of future plants. As the increased level of automation induces the modification of the tasks actually devoted to the operator in the control room, it is very important to anticipate these consequences at the plant design stage. The improvement of man machine cooperation is expected to play a major role in minimizing the impact of human errors on plant safety. The CEA has launched a research program concerning the evolution of the plant operation in order to optimize the efficiency of the human/computer systems for a better safety. The objective of this program is to evaluate different modalities of man-machine share of tasks, in a representative context. It relies strongly upon the development of a specific testing facility, the ESCRIME work bench, which is presented in this paper. It consists of an EDF 1300MWe PWR plant simulator connected to an operator workstation. The plant simulator model presents at a significant level of details the instrumentation and control of the plant and the main connected circuits. The operator interface is based on the generalization of the use of interactive graphic displays, and is intended to be consistent to the tasks to be performed by the operator. The functional architecture of the workstation is modular, so that different cooperation mechanisms can be implemented within the same framework. It is based on a thorough analysis and structuration of plant control tasks, in normal as well as in accident situations. The software architecture design follows the distributed artificial intelligence approach. Cognitive agents cooperate in order to operate the process. The paper presents the basic principles and the functional architecture of the test bed and describes the steps and the present status of the program. (author)

  6. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1992-03-01

    The Finnish nuclear power plant units Loviisa 1 and 2 as well as TVO I and II were in operation for almost the whole third quarter of 1991. Longer interruptions in electricity generation were caused by the annual maintenances of the Loviisa plant units. The load factor average was 81.7 %. In a test conducted during the annual maintenance outage of Loviisa 1 it was detected that the check valve of the discharge line of one pressurized emergency make-up tank did not open sufficiently at the tank's hydrostatic pressure. In connection with a 1988 modification, a too tightly dimensioned bearing had been mounted on the valve's axle rod and the valve had not been duly tested after the operation. The event is classified as Level 1 on the International Nuclear Event Scale. Other events in this quarter which are classified according to the International Nuclear Event Scale are Level Zero (Below Scale). Occupational radiation doses and releases of radioactive material off-site were below authorised limits in this quarter. Only small amounts of radioactive materials originating in nuclear power plants were detected in samples taken in the vicinity of nuclear power plants

  7. Overview of plant life management for long term operation in nuclear power plants

    International Nuclear Information System (INIS)

    Kang, K.S.; Vincze, P.; Bychkov, A.

    2014-01-01

    Many IAEA member states have given high priority to licensing their nuclear power plants to operate for terms longer than the time frame originally anticipated (generally 40 years). The task of managing plant ageing is assigned in most member states to an engineering specialty called 'plant life management' (PLiM) applying a systematic analysis methodology to System Structure Components (SSCs) ageing. In many countries, the safety performance of nuclear power plants is periodically assessed and characterized via the periodic safety review (PSR) process. Regulatory review and acceptance of PSRs constitutes for these countries the licensing requirement for continued operation of the plant to the following PSR cycle (usually 10 years). In the USA and in other countries operating US designed plants, instead of PSR process, a license renewal application (LRA) process is followed, which requires certain prerequisites such as ageing management programs, particularly for passive irreplaceable SSCs. Active components are normally addressed via the maintenance rule (MR) requirements and other established regulatory processes. A third group of member states have adopted a combined approach that incorporates elements of both the PSR process and selected LRA specific requirements, such as time limited ageing analysis. The article ends with some IAEA recommendations for the implementation of national PLiM programs

  8. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Reponen, H.; Viitasaari, O.

    1985-09-01

    These general reviews of the operation of the Finnish nuclear power plants concentrate on such events and discoveries related to reactor and radiation safety that the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as significant. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment. The report also includes a summary of the radiation safety of the personnel and the environment and tabulated data on the production and capacity factors of the plants. (author)

  9. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    1988-04-01

    This general review of the operation of the Finnish nuclear power plants concentrates on such events and discoveries related to nuclear and radiation safety as the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tubulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment

  10. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Lehtinen, P.

    1986-08-01

    These general reviews of the operation of the Finnish nuclear power plants concentrate on such events and discoveries related to reactor and radiation safety that the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment. (author)

  11. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Reponen, H.; Viitasaari, O.; Lehtinen, P.

    1985-11-01

    These general reviews of the operation of the Finnish nuclear power plants concentrate on such events and discoveries related to reactor and radiation safety that the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as significant. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment. The report also includes a summary of the radiation safety of the personnel and the environment and tabulated data on the production and load factors of the plants. (author)

  12. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Heimburger, H.

    1988-08-01

    This general review of the operation of the Finnish nuclear power plants concentrates on such events and discoveries related to nuclear and radiation safety as the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment

  13. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Ottosson, C.

    1989-05-01

    This general review of the operation of the Finnish nuclear power plants concentrates on such events and discoveries related to nuclear and radiation safety as the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment

  14. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Haenninen, R.; Koponen, H.; Nevander, O.; Paltemaa, R.; Poellaenen, I.; Rannila, P.; Valtonen, K.; Vilkamo, O.

    1988-02-01

    This general review of the operation of the Finnish nuclear power plants concentrates on such events and discoveries related to nuclear and radiation safety as the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment

  15. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Haenninen, R.

    1988-09-01

    This general review of the operation of the Finnish nuclear power plants concentrates on such events and discoveries related to nuclear and radiation safety as the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hzard to the personnel or the environment

  16. Plant operational states analysis in low power and shutdown PSA

    International Nuclear Information System (INIS)

    He Jiandong; Qiu Yongping; Zhang Qinfang; An Hongzhen; Li Maolin

    2013-01-01

    The purpose of Plant Operational States (POS) analysis is to disperse the continuous and dynamic process of low power and shutdown operation, which is the basis of developing event tree models for accident sequence analysis. According to the design of a 300 MW Nuclear Power Plant Project, operating experience and procedures of the reference plant, a detailed POS analysis is carried out based on relative criteria. Then, several kinds of POS are obtained, and the duration of each POS is calculated according to the operation records of the reference plant. The POS analysis is an important element in low power and shutdown PSA. The methodology and contents provide reference for POS analysis. (authors)

  17. Development of emergency operator support system for next Japanese PWR plants

    International Nuclear Information System (INIS)

    Ito, K.; Hanada, S.; Yoshida, Y.; Sugino, K.

    2006-01-01

    The purpose of main control room improvement is to reduce operator workload and potential human errors by offering a better working environment where operators can maximize their abilities. Japanese PWR utilities and Mitsubishi have developed an operator support system entitled Emergency Operator Support System (EOSS). The system supports operators in incidental/accidental situations which may be worsened by human errors. In order to confirm the validity of the system, a proto type was built, and was evaluated by operator crews. The consequence showed good result of effectiveness in avoiding potential human errors and decreasing workload of operators. (authors)

  18. Development of a computerized operator support system for BWR power plant

    International Nuclear Information System (INIS)

    Monta, K.; Sekimizu, K.; Sato, N.; Araki, T.; Mori, N.

    1985-01-01

    A computerized operator support system for BWR power plant has been developed since 1980 supported by the Japanese government. The main functions of the systems are post trip operational guidance, disturbance analysis, standby system management, operational margin monitoring and control rod operational guidance. The former two functions aim at protection against incidents during operation of nuclear power plants and the latter three functions aim at their prevention. As the final stage of the development, these functions are combined with the plant supervision function and are organized as an advanced man-machine interface for BWR power plant. During the above process, operator task analyses are performed to enable synthesis of these support functions for right fit to operator tasks and to realize a hierarchical structure for CRT displays for right fit to operators cognitive needs. (author)

  19. Contribution of quality assurance to effective nuclear power plant operation

    International Nuclear Information System (INIS)

    Raisic, N.

    1984-01-01

    The regulatory requirements related to quality assurance (QA) serve as an effective mechanism in establishing and implementing the QA programme during the design, construction and operation of nuclear power plants. However, these requirements only relate to the equipment and activities concerning the safety of nuclear power plants; the decision as to their implementation on other non-safety-related equipment is left to the plant management. As a result, operation statistics show that the safety-related systems are performing satisfactorily and that they are not of serious concern to plant unavailability. On the other hand, non-safety-related equipment which is still vital to plant performances is more frequently responsible for plant outages and losses in electricity production. QA programmes implemented on such equipment are in principle less strict, unsystematic and, in a number of cases, non-existent. An attempt has been made to analyse the existing operating experience data in order to identify the correlation of outage statistics with QA programmes required by existing standards and their implementation practices, both in respect of programme coverage and intensity. Unfortunately, existing operating experience data cannot directly correlate plant performance with the QA programmes implemented in order to demonstrate the effectiveness of QA techniques to plant safety, reliability of plant equipment and plant availability. For these reasons an analysis is made of outage statistics to identify the modes and causes of outages and to relate them to existing QA requirements and practices. Some conclusions are deduced that relate to a possible improvement of plant performance by consequent implementation of QA requirements to the equipment and activities responsible for both plant safety and efficient electricity production, and by adequate grading of QA activities to obtain a cost-effective QA programme in plant operation. (author)

  20. System 80+TM standard plant: Design and operations overview

    International Nuclear Information System (INIS)

    Matzie, R.A.; Ritterbusch, S.E.

    1999-01-01

    The System 80+ Standard Plant Design is a 1400 MWe evolutionary Advanced Light Water Reactor (ALWR), designed to meet the Electric Power Research Institute (EPRI) ALWR Utility Requirements Document (URD) and the demands of the international market for nuclear power plants which are not only safer but also more economical to maintain and operate. ABB Combustion Engineering Nuclear Power used a defense-in-depth process that (1) adds design margin to basic components to improve performance during normal operation and to decrease the likelihood of an unanticipated transient or an accident, (2) improves the redundancy and diversity of safety systems in order to mitigate design basis accidents and prevent severe accidents, and (3) improves severe accident mitigation capability. This paper describes the most important improved systems and components with emphasis on severe accident prevention and mitigation capability. The improved design features were implemented in an evolutionary manner using proven components. This approach ensures that the plant operates safely and economically, as demonstrated by operating plants in the US and the Republic of Korea. Detailed studies, summarized in this paper, have shown that the System 80+ plant availability is expected to exceed the ALWR requirement of 87% and that the annual operations and maintenance costs are expected to be reduced by $14 million. (author)

  1. Management quality in spanish nuclear power plant operation

    International Nuclear Information System (INIS)

    Perez de Zabalza Ramos, F.

    1995-01-01

    This paper analyzes the reasons that lead nuclear power plants to require engineering support that is not usual in other types of industrial installations, namely the complexity of the plant and the economic consequences of a possible shutdown. At the time of unit startup, the need to use the services of experienced engineers for the technical support of nuclear power plants induced plant owners to turn to the engineering companies which had participated in the design of the plants. The paper lists the wide range of plant support services which these engineering companies can provide, both from their central offices and on site, especially in the field of change orders and documentation update. The paper also describes the satisfactory development of management parameters in Spanish nuclear power plants both in terms of load factor and comparison of operating and maintenance costs, and how engineering companies have contributed to this achievement, by reducing costs with no loss in the technical quality of their services. Finally, the paper describes how the engineering companies have had to adapt to a shrinking market without losing quality and how they achieved this by diversifying their services. In this context there are two areas of concern. the first area of concern is the competition from certain companies with oversized staff, who attempt to employ them in operation support for nuclear power stations, a field which does not correspond to the training and background of said staff. This could lead to a loss of quality or economic efficiency of nuclear power plants, whose operation up to now has proven satisfactory. The second area of concern is the operator's tendency to use their own resources for engineering support, making more difficult the renewal of human resources and thus leading to a decrease in productivity, and in the transfer of practical and theoretical experience from one plant to another, as well as in the transmission of the latest know

  2. Method for plant operation guidance by knowledge engineering technique

    International Nuclear Information System (INIS)

    Kiguchi, Takashi; Yoshida, Kenichi; Motoda, Hiroshi; Kobayashi, Setsuo

    1983-01-01

    A method for plant operation guidance has been developed by using the Knowledge Engineering technique. The method is characterized by its capability of handling plant dynamics. The knowledge-base includes plant simulation programs as tools to evaluate dynamic behaviors as well as production rules of ''if..., then...'' type. The inference engine is thus capable of predicting plant dynamics and making decisions in accordance with time progress. The performance of the guidance method was evaluated by simulation tests assuming various abnormal situations of a BWR power plant. It was shown that the method can detect each of the abnormal events along the course of their occurrence, and provide the guidance for corrective actions. The operation guidance method proposed in this paper is general and is applicable not only to nuclear power plants but also to other plants such as chemical production plants and fossile power plants. (author)

  3. Designing nuclear power plants for improved operation and maintenance

    International Nuclear Information System (INIS)

    1996-09-01

    The purpose of this publication is to compile demonstrated, experience based design guidelines for improving the operability and maintainability of nuclear power plants. The guidelines are for use principally in the design of new nuclear power plants, but should also be useful in upgrading existing designs. The guidelines derive from the experience of operating and maintaining existing nuclear power plants as well as from the design of recent plants. In particular these guidelines are based on and consistent with both the EPRI advanced Light Water Reactor Utility Requirements Document, Volume 1, and the European Utility Requirements for LWR Nuclear Power Plants. 6 refs, 1 fig

  4. Designing nuclear power plants for improved operation and maintenance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    The purpose of this publication is to compile demonstrated, experience based design guidelines for improving the operability and maintainability of nuclear power plants. The guidelines are for use principally in the design of new nuclear power plants, but should also be useful in upgrading existing designs. The guidelines derive from the experience of operating and maintaining existing nuclear power plants as well as from the design of recent plants. In particular these guidelines are based on and consistent with both the EPRI advanced Light Water Reactor Utility Requirements Document, Volume 1, and the European Utility Requirements for LWR Nuclear Power Plants. 6 refs, 1 fig.

  5. Designing for nuclear power plant maintainability and operability

    International Nuclear Information System (INIS)

    Pedersen, T.J.

    1998-01-01

    Experience has shown that maintenance and operability aspects must be addressed in the design work. ABB Atom has since long an ambition of achieving optimised, overall plant designs, and efficient feedback of growing operating experience has stepwise eliminated shortcomings, and yielded better and better plant operating performances. The records of the plants of the latest design versions are very good; four units in Sweden have operated at an energy availability of 90.1%, and the two Olkiluoto units in Finland at a load factor of 92.7%, over the last decade. The occupational radiation exposures have also been at a low level. The possibilities for implementing 'lessons learned' in existing plants are obviously limited by practical constraints. In Finland and Sweden, significant modernisations are still underway, however, involving replacement of mechanical equipment, and upgrading and backfitting of I and C systems on a large scale, in most of the plants. The BWR 90 design focuses on meeting requirements from utilities as well as new regulatory requirements, with a particular emphasis on the consequences of severe accidents; there shall be no large releases to the environment. Other design improvements involve: all-digital I and C systems and enhanced human factors engineering to improve work environment for operators, optimisation of buildings and containment to decrease construction time and costs, and selection of materials as well as maintenance of operating procedures to reduce radiation exposures even further. The BWR 90 design was offered to Finland in the early 1990s, but development work continues. It has been selected by a number of European utilities for assessing its conformance with the European Utility Requirements (EUR), aiming at a specific EUR Volume 3 for the BWR 90. Some characteristics of the ABB BWRs, with emphasis on features of importance for achieving improved economy and enhanced safety, are described below. (author)

  6. Management control and quality assurance during plant operation

    International Nuclear Information System (INIS)

    Modemann, G.; Ettemeyer, R.; Stephan, W.

    1980-01-01

    The present paper deals with basic aspects of quality assurance for owners of nuclear power plants, with quality assurance for plant operation and with consequences from KTA regulatory requirements. (RW)

  7. Summary of operating experience at Swedish nuclear power plants in 1984

    International Nuclear Information System (INIS)

    1985-01-01

    The four owners on nuclear power plants in Sweden - The Swedish State Power Board, Forsmarks Kraftgrupp AB, Sydkraft AB and OKG AKTIEBOLAG - formed in 1980 the Nuclear Safety Board of the Swedish Utilities as a joint body for collaboration in safety matters. The Board participates in coordination of the safety work of the utilities and conducts its own safety projects, whereever this is more efficient than the utilities' working independently. The work of the Board shall contribute to optimizing safety in the operation of the Swedish nuclear power plants. The most important function of the Board is to collect, process and evaluate information on operational disturbances and incidents at Swedish and foreign nuclear power plants and then use the knowledge thus gained to improve the safety of the operation of the Swedish nuclear power plants (experience feedback). The work with Experience Feedback proceeds in three stages: Event follow-up, Fault analysis and Feedback of results. The Board runs a system for experience feedback (ERF). ERF is a computer-based information and communication system. ERF provides the Board with a daily update of operating experience in both Swedish and foreign nuclear power plants. Each Swedish nuclear power station supplies the ERF system with data on, among other things, operation and operational distrubances. Important experiences are thereby fed back to plant operation. Experience from foreign nuclear power stations can be of interest to the Swedish nuclear power plants. This information comes to RKS and is reviewed daily. The information that is considered relevant to Swedish plants is fed after analysis into the ERF system. Conversely, foreign nuclear power stations can obtain information from the operation of the Swedish plants. (author)

  8. Operation status display and monitoring system for BWR nuclear power plant

    International Nuclear Information System (INIS)

    Wakabayashi, Yasuo; Hayakawa, Hiroyasu; Kawamura, Atsuo; Kaneda, Mitsunori.

    1982-01-01

    Lately, the development of the system has been made for BWR plants, which monitors the operating status not only in normal operation but also in abnormal state and also for plant safety. Recently, the improvement of man-machine interface has been tried through the practical use of technique which displays data collectively on a CRT screen relating them mutually. As one of those results, the practical use of an electronic computer and color CRT display for No. 1 unit in the Fukushima No. 2 Nuclear Power Station (2F-1), Tokyo Electric Power Co., is described. Also, new centralized control panels containing such systems were used for the 1100 MWe BWR nuclear power plants now under construction, No. 3 unit of the Fukushima No. 2 Power Station and No. 1 unit of Kashiwazaki-Kariwa Nuclear Power Station (2F-3 and K-1, respectively). The display and monitoring system in 2F-1 plant is the first one in which a computer and color CRTs were practically employed for a BWR plant in Japan, and already in commercial operation. The advanced operating status monitoring system, to which the result of evaluation of the above system was added, was incorporated in the new centralized control panels presently under production for 2F-3 and K-1 plants. The outline of the system, the functions of an electronic computer, plant operating status monitor, surveillance test guide, the automation of plant operation and auxiliary operation guide are reported for these advanced monitoring system. It was confirmed that these systems are useful means to improve the man-machine communication for plant operation minitoring. (Wakatsuki, Y.)

  9. Industrial applications for remote operation in a processing plant

    International Nuclear Information System (INIS)

    Hermier, J.; Le Guennec, R.

    1984-01-01

    In the first part of this article, J. Hermier covers the use of remote handling equipment in the UP2-400 plant at La Hague near Cherbourg, in which for the most part master/slave mechanism remote handling units are used with a number of these employed in daily processing operations. As regards this subject, it is useful to remember that, at the time of the designing of this plant (UP2-400), this was the only equipment available on the market with remote-controlled remote handling equipment. In the second part, before speaking about the development of remote operation equipment in the plants now under construction and attempting to project what might be the remote operation role in future plants, R. Le Guennec reviews the problems faced by engineering in designing industrial-sized processing plants and, consequently, the motivations of engineering when faced with a choice between several possible solutions [fr

  10. Comparison of Plant Life Management Approaches for Long Term Operations

    International Nuclear Information System (INIS)

    Kang, Kisig

    2012-01-01

    Plant life management can be defined as the integration of ageing and economic planning to maintain a high level of safety and optimize operations. Many Member States have given high priority to long term operation of nuclear power plants beyond the time frame originally anticipated (e. g. 30 or 40 years). Out of a total of 445 (369 GWe) operating nuclear power plants, 349 units (297 GWe) have been in operation for more than 20 years (as of November 2011). The need for engineering support to operation, maintenance, safety review and life management for long term operation as well as education and training in the field is increasingly evident. In addition the Fukushima accident has rendered all stake holders even more attentive to safety concerns and to the provision of beyond safety measures in the preparation and scrutiny of applications for operational design life extensions. In many countries, the safety performance of NPPs is periodically followed and characterized via the periodic safety review (PSR) approach. The regulatory The regulatory review and acceptance of the PSR gives the licensee the permission to operate the plant for up to the end of the next PSR cycle (usually 10 years). In the USA and other countries operating US designed plants, the license renewal application is based on the five pre-requisite requirements and ageing management programme for passive long life system structure and components(SSCs) and active systems is adequately addressed by the maintenance rule (MR) requirements and other established regulatory processes. Other Member States have adopted a combined approach that incorporates elements of both PSR and additional LRA specific requirements primarily focused on time limited ageing analysis. Taking into account this variety of approaches, the international atomic energy agency (IAEA) initiated work for collecting and sharing information among Member States about good practices on plant life management for long term operation in

  11. Development of nuclear plant Operation Management System

    Energy Technology Data Exchange (ETDEWEB)

    Koide, I.; Okada, T.; Ishida, K. [Chubu Electric Power Co. Inc., Nagoya (Japan)

    1998-09-01

    Recently it has become more important to detect a change in operational characteristics and to take appropriate corrective actions before it deteriorates to an incident in nuclear power plants. Therefore, aiming at earlier detection of a tendency change, swifter corrective actions and more effective application of operational data, we have developed Operation Management System which automatically acquires, accumulates and observes operational data of Hamaoka Nuclear Power Station through cycles. (author)

  12. Development of nuclear plant Operation Management System

    International Nuclear Information System (INIS)

    Koide, I.; Okada, T.; Ishida, K.

    1998-01-01

    Recently it has become more important to detect a change in operational characteristics and to take appropriate corrective actions before it deteriorates to an incident in nuclear power plants. Therefore, aiming at earlier detection of a tendency change, swifter corrective actions and more effective application of operational data, we have developed Operation Management System which automatically acquires, accumulates and observes operational data of Hamaoka Nuclear Power Station through cycles. (author)

  13. Safety and operation of the Stade nuclear power plant

    International Nuclear Information System (INIS)

    Salcher, H.

    1991-01-01

    The concept of PreussenElektra is to continuously increase the existing safety standard of the Stade nuclear power station using experience gained from faults and operation in nuclear power stations and the progressive state of the art. Modifications to achieve the most gentle operation of the plant have been completed and other are on-going. To do so instruments were attached to those components which are susceptible to fatigue to record the transients and extensive calculatory records were kept. Although the plant has almost 20 years successful operation behind it, it can still stand up well to comparisons with more recent plants as far as safety aspects are concerned. 6 figs

  14. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Reponen, H.; Viitasaari, O.

    1985-01-01

    This general review of the operation of the Finnish nuclear power plants in the second quarter of the year 1984 concentrates on such events and discoveries related to reactor and radiation safety that the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as significant. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment. The report also includes a summary of the radiation safety of the personnel and the environment and tabulated data on the production and availability of the plants. (author)

  15. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1992-09-01

    The Finnish nuclear power plant units Loviisa 1 and 2 as well as TVO I and II were in operation for almost all the time in the first quarter of 1992. The load factor average was 99.8%. All events which are classified on the International Nuclear Event Scale were level 0/below scale on the Scale. Occupational radiation doses and releases of radioactive material off-site remained well below authorised limits. Only quantities of radioactive material insignificant to radiation exposure, originating from the nuclear power plants, were detected in samples collected in the vicinity of the nuclear power plants

  16. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Reponen, H.; Viitasaari, O.

    1985-05-01

    This general review of the operation of the Finnish nuclear power plants in the third quarter of the year 1984 concentrates on such events and discoveries related to reactor and radiation safety that the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as significant. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment. The report also includes a summary of the radiation safety of the personnel and the environment and tabulated data on the production and capacity factors of the plants. (author)

  17. Modeling Operating Modes for the Monju Nuclear Power Plant

    DEFF Research Database (Denmark)

    Lind, Morten; Yoshikawa, H.; Jørgensen, Sten Bay

    2012-01-01

    of the process plant, its function and its structural elements. The paper explains how the means-end concepts of MFM can be used to provide formalized definitions of plant operation modes. The paper will introduce the mode types defined by MFM and show how selected operation modes can be represented...

  18. Safe operation of power plants. Pt. 1

    International Nuclear Information System (INIS)

    Freymeyer, P.

    1977-01-01

    Electrotechniques were given a dominating role in the construction of nuclear power plants. The operation of power plants - particularly nuclear power plants - is impossible without the use of electrotechnical and control means. Despite of all reserve in the development and despite of the conservative attitude it is necessary to use the newest results of development and to incite the development ot new electronic systems for the solution of these tasks. (orig.) [de

  19. Training and qualification of nuclear power plant operators (4)

    International Nuclear Information System (INIS)

    Ohsuga, Y.

    2009-01-01

    Training center using the simulators, instructor training, training upgrade, deployment of digital control panel and review of training were described with overseas practice. Recently, nuclear power plant on-site simulators were also used for respective operator training. Operator teamwork training, training team performance upgrade, reflection of operating experiences in nuclear power plant accidents, development of training support equipments and management of training records were needed to review and upgrade training and qualification programs. (T. Tanaka)

  20. Method of operating nuclear power plant

    International Nuclear Information System (INIS)

    Kodama, Tasuku.

    1991-01-01

    The present invention concerns a method of operating a plant in which the inside of a reactor container is filled with inert gases. That is, the pressure at the inside of the pressure vessel is controlled based on the values sent from an absolute pressure gage and a pressure low gage during usual operation. A pressure high alarm and a pressure high scram signal are generated from a pressure high detector and a scram pressure detector. With such a constitution, since the pressure at the inside of the reactor is always kept at a slightly positive level relative to the surrounding atmospheric pressure even when high atmospheric pressure approaches to the plant site, air does not flow into the reactor container. Accordingly, the oxygen concentration is not increased. When a low atmospheric pressure approaches, the control operation for the pressure at the inside of the container is not necessary. The amount of the inert gases consumed and the amount of radioactive materials released to the atmosphere are decreased. The method of the present invention improves the safety and the reliability of the reactor operation. (N.H.)

  1. Annual radiological environmental operating report: Sequoyah Nuclear Plant, 1987

    International Nuclear Information System (INIS)

    1988-04-01

    This report describes the environmental radiological monitoring program conducted by TVA in the vicinity of the Sequoyah Nuclear Plant in 1987. The program includes the collection of samples from the environment and the determination of the concentrations of radioactive materials in the samples. Samples are taken from stations in the general area of the plant and from areas not influenced by plant operations. Station locations are selected after careful consideration of the weather patterns and projected radiation doses to the various areas around the plant. Material sampled includes air, water, milk, foods, vegetation, soil, fish, sediment, and direct radiation levels. Results from stations near the plant are compared with concentrations from control stations and with preoperational measurements to determine potential impacts of plant operations. 2 figs., 2 tabs

  2. Centralized operation and monitoring system for nuclear power plants

    International Nuclear Information System (INIS)

    Kudo, Mitsuru; Sato, Hideyuki; Murata, Fumio

    1988-01-01

    According to the prospect of long term energy demand, in 2000, the nuclear power generation facilities in Japan are expected to take 15.9% of the total energy demand. From this fact, it is an important subject to supply nuclear power more stably, and in the field of instrumentation and control, many researches and developments and the incessant effort of improvement have been continued. In the central operation and monitoring system which is the center of the stable operation of nuclear power plants, the man-machine technology aiding operators by electronic and computer application technologies has been positively developed and applied. It is considered that hereafter, for the purpose of rationally heightening the operation reliability of the plants, the high quality man-machine system freely using the most advanced technologies such as high reliability digital technology, optical information transmission, knowledge engineering and so on is developed and applied. The technical trend of operation and monitoring system, the concept of heightening operation and monitoring capability, the upgrading of operation and monitoring system, and the latest operation, monitoring and control systems for nuclear power plants and waste treatment facilities are described. (K.I.)

  3. Optimization of operation for combined heat and power plants - CHP plants - with heat accumulators using a MILP formulation

    Energy Technology Data Exchange (ETDEWEB)

    Grue, Jeppe; Bach, Inger [Aalborg Univ. (Denmark). Inst. of Energy Technology]. E-mails: jeg@iet.auc.dk; ib@iet.auc.dk

    2000-07-01

    The power generation system in Denmark is extensively based on small combined heat and power plants (CHP plants), producing both electricity and district heating. This project deals with smaller plants spread throughout the country. Often a heat accumulator is used to enable electricity production, even when the heat demand is low. This system forms a very complex problem, both for sizing, designing and operation of CHP plants. The objective of the work is the development of a tool for optimisation of the operation of CHP plants, and to even considering the design of the plant. The problem is formulated as a MILP-problem. An actual case is being tested, involving CHP producing units to cover the demand. The results from this project show that it is of major importance to consider the operation of the plant in detail already in the design phase. It is of major importance to consider the optimisation of the plant operation, even at the design stage, as it may cause the contribution margin to rise significantly, if the plant is designed on the basis of a de-tailed knowledge of the expected operation. (author)

  4. The function of people in a nuclear power plant in operation

    International Nuclear Information System (INIS)

    Pickel, E.

    1986-01-01

    Based mainly on the operating experience of Obrigheim nuclear power plant - a two-loop pressurized water reactor with about 120,000 operating hours - the function of people in the very complex technical field of operation including supervision, maintenance and repair of a nuclear power plant is presented with special attention to safety related activities. The boundaries are indicated where automatic actions for safety and economic reasons are necessary and where manually operated systems are possible or even desirable. Typical examples and figures will show, how the operating people influenced the operation and availability of Obrigheim nuclear power plant. (orig./GL)

  5. Ensuring the operational safety of nuclear power plants with WWER reactors

    International Nuclear Information System (INIS)

    Shasharin, G.A.; Veretennikov, G.A.; Abagyan, A.A.; Lesnoj, S.A.

    1984-01-01

    At the start of 1983, 27 nuclear power producing units with reactor facilities of the WWER type were in operation in the Soviet Union and other countries. In 1982 the average load factor for nuclear power plants with WWER reactors was 73 per cent. There was not a single nuclear accident or even damage with any significant radiation consequences in the WWER reactors during the entire period of their operation. The most modern nuclear power plants with WWER-440 and WWER-1000 reactors meet all present-day international requirements. Safe operation of the plants is achieved by a variety of measures, the most important of which include: procedures for increasing the reliability of plant equipment and systems; ensuring exact compliance with plant operating instructions; ensuring reliable operation of plant safety systems; action directed towards maintaining the skills of plant personnel at a level adequate to ensure the taking of proper action during transient processes and accident situations. The paper discusses concrete steps for ensuring safe nuclear power plant operation along these lines. In particular, measures such as the following are described: the use of a system for collecting and processing information on equipment failures and defects; the development and introduction of methods of early defect diagnosis; the performance of complex testing of safety systems; the training of highly skilled personnel for nuclear power plants at educational combines and at teaching and training centres making use of simulators; arranging accident-prevention training and special instruction for personnel. (author)

  6. Nuclear plant life extension

    International Nuclear Information System (INIS)

    Negin, C.A.

    1989-01-01

    The nuclear power industry's addressing of life extension is a natural trend in the maturation of this technology after 20 years of commercial operation. With increasing emphasis on how plants are operated, and less on how to build them, attention is turning on to maximizing the use of these substantial investments. The first studies of life extension were conducted in the period from 1978 and 1982. These were motivated by the initiation, by the Nuclear Regulatory Commission (NRC), of studies to support decommissioning rulemaking. The basic conclusions of those early studies that life extension is feasible and worth pursuing have not been changed by the much more extensive investigations that have since been conducted. From an engineering perspective, life extension for nuclear plants is fundamentally the same as for fossil plants

  7. Radiation protection during operation of nuclear power plants

    International Nuclear Information System (INIS)

    1983-01-01

    This Guide describes a Radiation Protection Programme for nuclear power plants. It includes: (1) An outline of the basic principles as well as practical aspects of the programme; (2) A description of the responsibilities of the operating organization to establish an effective programme based upon these principles; (3) A description of the administrative and technical measures to establish and implement the programme. This Guide also deals with the operational aspects to be considered by the operating organization in reviewing design in order to facilitate implementation of the Radiation Protection Programme. This Guide covers the requirements for a Radiation Protection Programme for all operational states of the nuclear power plant. It also includes guidelines for handling planned special exposures and for coping with unplanned exposures and contamination of personnel, areas, and equipment. Additional information concerning emergency situations involving releases of radioactive materials is given in Safety Guides 50-SG-O6, ''Preparedness of the Operating Organization (Licensee) for Emergencies at Nuclear Power Plants'', and 50-SG-G6, ''Preparedness of Public Authorities for Emergencies at Nuclear Power Plants''. This Guide covers the principles of dose limitation to site personnel and to the public, but it does not include detailed instructions on the techniques used for the actual measurement and evaluation of the exposures. This Guide does not include detailed instructions on environmental surveys, but it does mention principal steps in environmental monitoring which may be required for confirmation of the acceptability of radioactive discharges

  8. Study on the Operating Strategy of HVAC Systems for Nuclear Decommissioning Plant

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sung-hwan; Han, Sung-heum; Lee, Jae-gon [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    According as Kori nuclear power plant unit 1 was determined to be defueled in 2017, various studies on nuclear plant decommissioning have been performed. In nuclear decommissioning plant, HVAC systems with large fan and electric coil have to be operated for long periods of time to support various types of work from defueled phase to final dismantling phase. So, in view of safety and utility costs, their overall operating strategy need to be established prior to defueled phase. This study presents HVAC system operating strategy at each decommissioning phase, that is, defueled plant operating phase, SSCs(systems, structures, components) decontamination and dismantling phases. In defueled plant operating phase, all fuel assemblies in reactor vessel are transferred to spent fuel pool(SFP) permanently. In defueled plant operation phase, reduction of the operating system trains is more practicable than the introduction of new HVAC components with reduced capacity. And, based on the result of the accident analyses for this phase, HVAC design bases such as MCR habitability requirement can be mitigated. According to these results, associated SSCs also can be downgraded. In similar approach, at each phase of plant decommissioning, proper inside design conditions and operating strategies should be re-established.

  9. Is it possible long-tern operation of Spanish nuclear power plants?

    International Nuclear Information System (INIS)

    Regano, M.

    2004-01-01

    The long term operation of nuclear power plants beyond 40 years is a reality. Worlswide accumulated operating experience, national and international R and D projects related with the ageing of materials and the specific studies presented to the NRC by more than thirty American plant guarantee that the operation of nuclear power plants beyond 40 years will be carried out with the same or greater safety and reliability factors. The advantages of the long term operation of Spain nuclear power plants are obvious. The implementation of this option will play an important role in complying with the Kyoto compromises, avoiding the emission of 50 million tons of CO2 will contribute to guaranteeing the supply of electricity by generating an additional 600,000 GWh and will contribute to keeping electricity prices down. The total generating cost for the long term operation of nuclear power plants is approximately half that of a new coal or combined cycle plant. Spain is hugely dependent on energy. In this situation, all energies are necessary and the long term operation of nuclear power plants can of course play an important role in covering the gap between offer and demand, guaranteeing supply in the most economic way possible and with the greatest respect for the environment. (Author)

  10. Computerization of operation and maintenance for nuclear power plants

    International Nuclear Information System (INIS)

    1995-07-01

    This report provides a resource for computerization of activities in plant operation and maintenance. Experience gained from design and implementation of various computer systems around the world is described. The material may be useful as a guide to modification and upgrading of existing plants as well as design and engineering of new plants. It should be particularly of interest to managers and engineers who are engaged in planning, bidding, specifying or designing computer systems for operation and maintenance applications. Refs, figs and tabs

  11. Computerization of operation and maintenance for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This report provides a resource for computerization of activities in plant operation and maintenance. Experience gained from design and implementation of various computer systems around the world is described. The material may be useful as a guide to modification and upgrading of existing plants as well as design and engineering of new plants. It should be particularly of interest to managers and engineers who are engaged in planning, bidding, specifying or designing computer systems for operation and maintenance applications. Refs, figs and tabs.

  12. Improving nuclear power plant safety through operator aids

    International Nuclear Information System (INIS)

    1987-12-01

    In October 1986, the IAEA convened a one-week Technical Committee Meeting on Improving Nuclear Power Plant Safety Through Operator Aids. The term ''operator aid'' or more formally ''operator support system'' refers to a class of devices designed to be added to a nuclear power plant control station to assist an operator in performing his job and thereby decrease the probability of operator error. The addition of a carefully planned and designed operator aid should result in an increase in nuclear power plant safety and reliability. Operator aids encompass a wide range of devices from the very simple, such as color coding a display to distinguish it out of a group of similar displays, to the very complex, such as a computer-generated video display which concentrates a number of scattered indicator readings located around a control room into a concise display in front of the operator. This report provides guidelines and information to help make a decision as to whether an operator aid is needed, what kinds of operator aids are available and whether it should be purchased or developed by the utility. In addition, a discussion is presented on advanced operator aids to provide information on what may become available in the future. The broad scope of these guidelines makes it most suitable for use by a multi-disciplinary team. The document consists of two parts. The recommendations and results of the meeting discussions are given in the first part. The second part is the annex where the papers presented at the Technical Committee Meeting are printed. A separate abstract was prepared for each of the 10 papers. Refs, figs and tabs

  13. An analysis of nuclear plant operating costs: A 1991 update

    International Nuclear Information System (INIS)

    1991-05-01

    This report updates a 1988 Energy Information Administration (EIA) report which examined trends in nonfuel operating costs at the Nation's nuclear power plants. Nonfuel operating costs are comprised of operating and maintenance (O ampersand M) costs and capital expenditures incurred after a plant begins operating. Capital expenditures are typically called ''capital additions'' because the costs are added to the utility's rate base and recovered as a depreciation expense over several years, the number of years being regulated by State Public Utility Commissions. These costs consist of large maintenance expenditures needed to keep a plant operational as well as those needed to make plant modifications mandated by the Nuclear Regulatory Commission (NRC) or implemented at the utility's discretion. The 1988 report found that from 1974 through 1984, the last year for which data were available, nuclear power plant nonfuel operating costs escalated by 14 percent annually in real terms. The objective of the present study was to determine whether trends in nonfuel operating costs have changed since 1984, if there was any change in the underlying factors influencing these costs, and if so, how these changes affect the basic conclusions of the 1988 report. The general trends are encouraging: Total nonfuel operating costs peaked in 1984 and have been lower since that time; O ampersand M costs have been rising, but at a much lower rate than seen from 1974 through 1984; capital additions costs have actually been declining. 9 figs., 12 tabs

  14. U.S. Nuclear Power Plant Operating Cost and Experience Summaries

    International Nuclear Information System (INIS)

    Reid, RL

    2003-01-01

    The ''U.S. Nuclear Power Plant Operating Cost and Experience Summaries'' (NUREG/CR-6577, Supp. 2) report has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants during 2000-2001. Costs incurred after initial construction are characterized as annual production costs, which represent fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications, which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operations summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from operating reports submitted by the licensees, the Nuclear Regulatory Commission (NRC) database for enforcement actions, and outage reports

  15. Operational limits and conditions for nuclear power plants

    International Nuclear Information System (INIS)

    1979-01-01

    This Safety Guide was prepared as part of the Agency's programme, referred to as the NUSS programme, for establishing Codes of Practice and Safety Guides relating to nuclear power plants. It covers the concept of operational limits and conditions, their content as applicable to various types of thermal reactors, and the responsibilities of the operating organization regarding their establishment, modification, compliance and documentation. The principles of the operational limits and conditions are established in section 3 of the Agency's Code of Practice on Safety in Nuclear Power Plant Operation, including Commissioning and Decommissioning (IAEA Safety Series No. 50-C-O), which this present Safety Guide supplements. In order to present all pertinent information in this Guide, the provisions of section 3 of the Code are repeated

  16. Effect of stage development of mining operations on maximization the net present value in long-term planning of open pits

    OpenAIRE

    Kržanović, Daniel; Rajković, Radmilo; Mikić, Miomir; Ljubojev, Milenko

    2014-01-01

    Long-term planning in the mining industry has one main goal: maximizing the value that is realized by excavation and processing of mineral resources. When designing the open pits, determining the stages of development the mining operations, (eng. Pushback) is one of the important factors in the process of long-term production planning. Using the different scientific methods and mathematical algorithms underlying the operation of modern software for strategic planning of production, it is poss...

  17. Knowledge and abilities catalog for nuclear power plant operators: boiling water reactors

    International Nuclear Information System (INIS)

    1986-09-01

    The Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Boiling-Water Reactors (BWR) (NUREG-1123) provides the basis for the development of content-valid licensing examinations for reactor operators (ROs) and senior reactor operators (SROs). The examinations developed using the BWR Catalog and Examiners' Handbook for Developing Operator Licensing Examinations (NUREG-1121) will cover those topics listed under Title 10, Code of Federal Regulations, Part 55. The BWR Catalog contains approximately 7000 knowledge and ability (K/A) statements for ROs and SROs at boiling water reactors. Each K/A statement has been rated for its importance to the safe operation of the plant in a manner ensuring personnel and public health and safety. The BWR K/A Catalog is organized into five major sections: Plant-wide Generic Knowledge and Ability Statements, Plant Systems grouped by Safety Function, Emergency and Abnormal Plant Evolutions, Components, and Theory. The BWR Catalog represents a modification of the form and content of the K/A Catalog for Nuclear Power Plant Operators: Pressurized Water Reactors (NUREG-1122). First, categories of knowledge and ability statements have been redefined. Second, the scope of the definition of emergency and abnormal plant evolutions has been revised in line with a symptom-based approach. Third, K/As related to the operational applications of theory have been incorporated into the delineations for both plant systems and emergency and abnormal plant evolutions, while K/As pertaining to theory fundamental to plant operation have been delineated in a separate theory section. Finally, the components section has been revised

  18. The importance of the reliability study for the safety operation of chemical plants. Application in heavy water plants

    International Nuclear Information System (INIS)

    Dumitrescu, Maria; Lazar, Roxana Elena; Preda, Irina Aida; Stefanescu, Ioan

    1999-01-01

    Heavy water production in Romania is based on H 2 O-H 2 S isotopic exchange process followed by vacuum isotopic distillation. The heavy water plant are complex chemical systems, characterized by an ensemble of static and dynamic equipment, AMC components, enclosures. Such equipment must have a high degree of reliability, a maximum safety in technological operation and a high availability index. Safety, reliable and economical operation heavy water plants need to maintain the systems and the components at adequate levels of reliability. The paper is a synthesis of the qualitative and quantitative assessment reliability studies for heavy water plants. The operation analysis on subsystems, each subsystems being a well-defined unit, is required by the plant complexity. For each component the reliability indicators were estimated by parametric and non-parametric methods based on the plant operation data. Also, the reliability qualitative and quantitative assessment was done using the fault tree technique. For the dual temperature isotopic exchange plants the results indicate an increase of the MTBF after the first years of operation, illustrating both the operation experience increasing and maintenance improvement. Also a high degree of availability was illustrated by the reliability studies of the vacuum distillation plant. The establishment of the reliability characteristics for heavy water plant represents an important step, a guide for highlighting the elements and process liable to failure being at the same time a planning modality to correlate the control times with the maintenance operations. This is the way to minimise maintenance, control and costs. The main purpose of the reliability study was the safety increase of the plant operation and the support for decision making. (authors)

  19. Wind power plant in grid operation

    International Nuclear Information System (INIS)

    Heier, S.

    1993-01-01

    There are new prospects for electrical energy supply in coastal regions and on islands if one succeeds in integrating the available wind energy, dependent on the weather, into existing and to be developed supply structures. Apart from the supply of energy, effects on the grid and on the electrical consumer are gaining in importance. For wind power plants, the operating behaviour is appreciably determined by the electro-technical concept. The mechanical/electrical energy conversion with the corresponding grid connection and plant control play an important part here. Results of measurements and computer simulation make the differences in the behaviour of wind power plants clear. (orig.) [de

  20. Modifications needed to operate PWR's plants in G-Mode

    International Nuclear Information System (INIS)

    Stainman, J.P.

    1985-01-01

    The production of electricity from PWR nuclear plants represents 44% of the total production of electricity in France for 1984, and 68% of the electricity produced by Thermal power plants (127 TWh over 187 TWh). These data show clearly that the French PWR plants do not work in ''base mode'' anymore but have to fit production with consumption, in other words to assume the frequency control. To participate permanently to the load follow and frequency control, it appeared that some improvements in the field of pressurizer level and pressure control were necessary as well as in the field of operator aids computer. It should be noted that these improvements are useful even without taking into account the constraints due to load follow and frequency control because of the mechanical stress in the CVCS piping, for instance. Some additional tests are planned to better identify this specific problem. The need of a more flexible operating mode than ones given by the initial system (black control rods), significantly reduced in 1973 due to the application of the ECCS criterion, led EDF and Framatome to develop a new operating mode (G. Mode) allowing a faster power escalation (5% PN/mn) whatever the fuel burn-up. This new operating mode improves significantly also the flexibility of operation when the frequency control is needed, and helps a lot the operators in such cases. All the 900 MWe Nuclear plants will be able to operate in ''G mode'' before the end of 1984

  1. Quality management for nuclear power plant operation: A manual

    International Nuclear Information System (INIS)

    1990-01-01

    The experience from well operated nuclear power plants shows that achievement of safe, reliable and economic performance is closely related to a strong commitment and involvement by the management personnel. A system of controls is necessary to ensure that satisfactory quality in operation is achieved and maintained over the long term. The key to achieving and assuring quality lies in the ability of management to define performance objectives and to ensure that significant safety and reliability problems are prevented or detected early and resolved. This Manual has been developed by the IAEA to assist plant managers in fulfilling their responsibility with regard to the control and direction of quality and of quality assurance activities in nuclear power plant operation. It emphasizes quality objectives for nuclear power plant operation and indicates the way in which a quality system based on quality assurance principles as established in the IAEA NUSS documents can be used by managers to accomplish these objectives. Since the Manual is mainly directed at management personnel, it is presented in the form of short highlighted practices complemented by typical examples of forms and procedures. Since not all the activities under the heading of quality in operation could be covered in a single document, the activities selected for this Manual comprise those where it was felt that practical advice is generally needed. A pragmatic document useful for direct application by plant managers was the envisaged objective

  2. Instrumentation and control system upgrade plan for operating PWR plants in Japan

    International Nuclear Information System (INIS)

    Ishii, Hirofumi

    1993-01-01

    Digital technology has been applied to all non-safety grade instrumentation and control (I ampersand C) systems in the latest Japanese PWR plants, and has achieved more reliable and operable systems, easier maintenance and cable reductions. In the next stage APWR plants, the digital technology will be also applied to all the I ampersand C systems including safety grade systems. Parallel to the above efforts, many backfitting programs in which the digital technology is applied to operating plants are under way to improve reliability and operability. The backfitting programs for operating plants are proceeded in two phases, synthesizing various utility's needs to improve plant availability and operability, improvement of digital technology, and complexity of the practicable replacement procedures. Phase 1 is a partial application of digital technology, while Phase 2 is a complete application of digital technology. Phase 1 has been implemented in a number of operation plants, while Phase 2 studies are in the design stage, but have not been implemented at this point. This paper presents examples of the partial application of digital technology to operating plants, and the contents of basic design for the complete application of digital technology

  3. Operating experience in nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1984-01-01

    The nuclear power plants in the Federal Republic of Germany kept their portion of power supply into the public grid system constant in 1983, compared to 1982. The generation had an absolute increase of 3.6% and amounts now to 65.9 TWh. Particularly mentioned should be the generation of the Grafenrheinfeld Nuclear Power Plant which is holding the 'World Record' with 9.969 TWh. The availability of the plants was generally satisfactory, as far as long-term retrofit measures with long outage periods were not necessary, as it was the case in Brunsbuettel and Wuergassen. The planned retrofit phases have been completed in all power plants. As far as safety is concerned, there was no reason to recommended a change of the present fundamental planning- and operation aspects. (orig.) [de

  4. Current trends in codal requirements for safety in operation of nuclear power plants

    International Nuclear Information System (INIS)

    Srivasista, K.; Shah, Y.K.; Gupta, S.K.

    2006-01-01

    The Code of practice on safety in nuclear power plant operation states the requirements to be met during operation of a nuclear power plant for assuring safety. Among various stages of authorization, regulatory body issues authorization for operation of a nuclear power plant, monitors and enforces regulatory requirements. The responsible organization shall have overall responsibility and the plant management shall have the primary responsibility for ensuring safe and efficient operation of its nuclear power plants. A set of codal requirements covering technical and administrative aspects are mandatory for the plant management to implement to ensure that the nuclear power plant is operated in accordance with the design intent. Requirements on operating procedures and instructions establish operation and maintenance, inspection and testing of the plant in a planned and systematic way. The requirements on emergency preparedness programme establish with a reasonable assurance that, in the event of an emergency situation, appropriate measures can be taken to mitigate the consequences. Commissioning requirements verify performance criteria during commissioning to ensure that the design intent and QA requirements are met. Several modifications in systems important to safety required during operation of a nuclear power plant are regulated. However new operational codal requirements arising out of periodic safety review, operational experience feedback, life management, probabilistic safety assessment, physical security, safety convention and obligations and decommissioning are not covered in the present code of practice for safety in nuclear power plant operation. Codal provisions on 'Review by operating organization on aspects of design having implications on operability' are also required to be addressed. The merits in developing such a methodology include acceptance of the design by operating organization, ensuring maintainability, proper layout etc. in the new designs

  5. Operational safety performance indicators for nuclear power plants

    International Nuclear Information System (INIS)

    2000-05-01

    Since the late 1980s, the IAEA has been actively sponsoring work in the area of indicators to monitor nuclear power plant (NPP) operational safety performance. The early activities were mainly focused on exchanging ideas and good practices in the development and use of these indicators at nuclear power plants. Since 1995 efforts have been directed towards the elaboration of a framework for the establishment of an operational safety performance indicator programme. The result of this work, compiled in this publication, is intended to assist NPPs in developing and implementing a monitoring programme, without overlooking the critical aspects related to operational safety performance. The framework proposed in this report was presented at two IAEA workshops on operational safety performance indicators held in Ljubljana, Slovenia, in September 1998 and at the Daya Bay NPP, Szenzhen, China, in December 1998. During these two workshops, the participants discussed and brainstormed on the indicator framework presented. These working sessions provided very useful insights and ideas which where used for the enhancement of the framework proposed. The IAEA is acknowledging the support and contribution of all the participants in these two activities. The programme development was enhanced by pilot plant studies. Four plants from different countries with different designs participated in this study with the objective of testing the applicability, usefulness and viability of this approach

  6. Plant life extensions for German nuclear power plants? Controversial discussion profit taking of nuclear power plant operators

    International Nuclear Information System (INIS)

    Matthes, Felix C.

    2009-10-01

    The discussion on the plant life extensions for German nuclear power plants beyond the residual quantity of electricity particularly focus on three aspects: Effects for the emission of carbon dioxide as a greenhouse gas; Development of the electricity price for which a reduction or attenuation is postulated due to a plant life extension; Skimming of additional profits at operating companies and their use in the safeguarding of the future (development of renewable energies, support of energy efficiency, promotion of the research, consolidation of the public budget, and so on). Under this aspect, the author of the contribution under consideration reports on the profit taking of nuclear power plant operators. The presented analysis considers three aspects: (a) Specification of the quantity structures for the investigated model of plant life extension; (b) The decisive parameter is the revenue situation and thus the price development for electricity at wholesale markets; (c) Determination and evaluation of the course in time of the profit taking.

  7. Integrated operation and management system for a 700MW combined cycle power plant

    Energy Technology Data Exchange (ETDEWEB)

    Shiroumaru, I. (Yanai Power Plant Construction Office, Chugoku Electric Power Co., Inc., 1575-5 Yanai-Miyamoto-Shiohama, Yanai-shi, Yamaguchi-ken (JP)); Iwamiya, T. (Omika Works, Hitachi, Ltd., 5-2-1 Omika-cho, Hitachi-shi, Ibaraki-ken (JP)); Fukai, M. (Hitachi Works, Hitachi, Ltd., 3-1-1 Saiwai-cho, Hitachi-shi, Ibaraki-ken (JP))

    1992-03-01

    Yanai Power Plant of the Chugoku Electric Power Co., Inc. (Yamaguchi Pref., Japan) is in the process of constructing a 1400MW state-of-the-art combined cycle power plant. The first phase, a 350MW power plant, started operation on a commercial basis in November, 1990. This power plant has achieved high efficiency and high operability, major features of a combined cycle power plant. The integrated operation and management system of the power plant takes care of operation, maintenance, control of general business, etc., and was built using the latest computer and digital control and communication technologies. This paper reports that it is expected that this system will enhance efficient operation and management for the power plant.

  8. The maximal U(1){sub L} inverse seesaw from d = 5 operator and oscillating asymmetric Sneutrino dark matter

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Zhaofeng [Korea Institute for Advanced Study, School of Physics, Seoul (Korea, Republic of); Institute of Theoretical Physics, Chinese Academy of Sciences, Key Laboratory of Frontiers in Theoretical Physics, Beijing (China); Li, Jinmian [Institute of Theoretical Physics, Chinese Academy of Sciences, Key Laboratory of Frontiers in Theoretical Physics, Beijing (China); University of Adelaide, ARC Centre of Excellence for Particle Physics at the Terascale and CSSM, Department of Physics, Adelaide, SA (Australia); Li, Tianjun [Institute of Theoretical Physics, Chinese Academy of Sciences, Key Laboratory of Frontiers in Theoretical Physics, Beijing (China); University of Electronic Science and Technology of China, School of Physical Electronics, Chengdu (China); Liu, Tao [University of Alberta, Department of Physics, Edmonton, Alberta (Canada); Yang, Jin Min [Institute of Theoretical Physics, Chinese Academy of Sciences, Key Laboratory of Frontiers in Theoretical Physics, Beijing (China)

    2016-05-15

    The maximal U(1){sub L} supersymmetric inverse seesaw mechanism (MLSIS) provides a natural way to relate asymmetric darkmatter (ADM)with neutrino physics. In this paper we point out that MLSIS is a natural outcome if one dynamically realizes the inverse seesaw mechanism in the next-to minimal supersymmetric standard model (NMSSM) via the dimension-five operator (N){sup 2}S{sup 2}/M{sub *}, with S the NMSSM singlet developing TeV scale VEV; it slightly violates lepton number due to the suppression by the fundamental scale M{sub *}, thus preserving U(1){sub L} maximally. The resulting sneutrino is a distinguishable ADM candidate, oscillating and favored to have weak scale mass. A fairly large annihilating cross section of such a heavy ADM is available due to the presence of singlet. (orig.)

  9. Safety goals for nuclear power plant operation

    International Nuclear Information System (INIS)

    1983-05-01

    This report presents and discusses the Nuclear Regulatory Commission's, Policy Statement on Safety Goals for the Operation of Nuclear Power Plants. The safety goals have been formulated in terms of qualitative goals and quantitative design objectives. The qualitative goals state that the risk to any individual member of the public from nuclear power plant operation should not be a significant contributor to that individual's risk of accidental death or injury and that the societal risks should be comparable to or less than those of viable competing technologies. The quantitative design objectives state that the average risks to individual and the societal risks of nuclear power plant operation should not exceed 0.1% of certain other risks to which members of the US population are exposed. A subsidiary quantitative design objective is established for the frequency of large-scale core melt. The significance of the goals and objectives, their bases and rationale, and the plan to evaluate the goals are provided. In addition, public comments on the 1982 proposed policy statement and responses to a series of questions that accompanied the 1982 statement are summarized

  10. To a cooperating approach for plant operator aid

    International Nuclear Information System (INIS)

    Penalva, J.M.; Mathieu, D.

    1993-01-01

    In this article we present the basic principles of a plant aid system for a spent fuel reprocessing shop. These principles are based on a cooperating approach of plant operator aid and on a systemic step SAGACE. 2 figs

  11. Tri-maximal vs. bi-maximal neutrino mixing

    International Nuclear Information System (INIS)

    Scott, W.G

    2000-01-01

    It is argued that data from atmospheric and solar neutrino experiments point strongly to tri-maximal or bi-maximal lepton mixing. While ('optimised') bi-maximal mixing gives an excellent a posteriori fit to the data, tri-maximal mixing is an a priori hypothesis, which is not excluded, taking account of terrestrial matter effects

  12. The knowledge-based framework for a nuclear power plant operator advisor

    International Nuclear Information System (INIS)

    Miller, D.W.

    1989-01-01

    An important facet in the design, development, and evaluation of aids for complex systems is the identification of the tasks performed by the operator. Operator aids utilizing artificial intelligence, or more specifically knowledge-based systems, require identification of these tasks in the context of a knowledge-based framework. In this context, the operator responses to the plant behavior are to monitor and comprehend the state of the plant, identify normal and abnormal plant conditions, diagnose abnormal plant conditions, predict plant response to specific control actions, and select the best available control action, implement a feasible control action, monitor system response to the control action, and correct for any inappropriate responses. These tasks have been identified to formulate a knowledge-based framework for an operator advisor under development at Ohio State University that utilizes the generic task methodology proposed by Chandrasekaran. The paper lays the foundation to identify the responses as a knowledge-based set of tasks in accordance with the expected human operator responses during an event. Initial evaluation of the expert system indicates the potential for an operator aid that will improve the operator's ability to respond to both anticipated and unanticipated events

  13. Administration in an operating plant

    International Nuclear Information System (INIS)

    Staebler, K.

    1977-01-01

    The importance of strict administrative procedures in the daily work is being demonstrated by commenting on events that occured in the operation of German nuclear power plants. The procedure for working in an area of the plant (pressurized medium, high-radioactive level, explosive of flammable mediums), where special measures for safe working have to be taken, is discussed in detail. The administrative problems during refuelling time are further on mentioned, especially the problems connected with administering more than 1,000 people with respect to health protection and sabotage protection. Some general comments on the influences from external causes (authorities, courts, etc.) are given. (orig./ORU) [de

  14. Evaluating and improving nuclear power plant operating performance

    International Nuclear Information System (INIS)

    1999-07-01

    This report aims to provide the basis for improvements in the understanding of nuclear power plants operation and ideas for improving future productivity. The purpose of the project was to identify good practices of operating performance at a few of the world's most productive plants. This report was prepared through a series of consultants meetings, a specialists meeting and an Advisory Group meeting with participation of experts from 23 Member States. The report is based on self-assessment of half a dozen plants that have been chosen as representatives of different reactor types in as many different countries, and the views and assessment of the participants on good practices influencing plant performance. Three main areas that influence nuclear power plant availability and reliability were identified in the discussions: (1) management practices, (2) personnel characteristics, and (3) working practices. These areas cover causes influencing plant performance under plant management control. In each area the report describes factors or good practices that positively influence plant availability. The case studies, presented in annexes, contain the plant self-assessment of areas that influence their availability and reliability. Six plants are represented in the case studies: (1) Dukovany (WWER, 1760 MW) in the Czech Republic; (2) Blayais (PWR, 3640 MW) in France; (3) Paks (WWER, 1840 MW) in Hungary; (4) Wolsong 1 (PHWR, 600 MW) in the Republic of Korea; (5) Trillo 1 (PWR, 1066 MW) in Spain; and (6) Limerick (BWR, 2220 MW) in the United States of America

  15. The operational benefits of integrated PC control of gamma irradiation plants

    International Nuclear Information System (INIS)

    Comben, M.; Stephens, P.

    1998-01-01

    Compared with the traditional PLC control systems used on many gamma irradiation plants, the semi-intelligent decision making capabilities of a fully integrated PC control system can bring many benefits to the plant operator. The authors will describe how plant operation is fully automatic with the PC control providing all the input-output data required to run the plant efficiently and safely. Detailed product tracking, with live on-screen data, can be incorporated to give both plant operator and product manufacturer complete confidence in the irradiation process. Advanced features such as on-line diagnostics and mechanical part failure prediction are also described. Also available is automated dosimetry, reducing the opportunity for human error, whilst at the same time saving on staff costs and providing highly professional dose validation reports and comprehensive routine dosimetry documentation. The benefits of PURIDEC's PC control system are not only available with its new plants. The system can be supplied as an upgrade to plants of all ages and design giving the current operator all the benefits described in the paper

  16. The economics of long-term operation of nuclear power plants

    International Nuclear Information System (INIS)

    Lokhov, Alexey; Huerta, Alejandro; Dufresne, Luc; Giraud, Anne; Osouf, Nicolas

    2012-01-01

    Refurbishment and long-term operation (LTO) of existing nuclear power plants (NPPs) today are crucial to the competitiveness of the nuclear industry in OECD countries as existing nuclear power plants produce base-load power at a reliable cost. A number of nuclear power plants, most notably 73 units in the United States (up to 2012), have been granted lifetime extensions of up to 60 years, a development that is being keenly watched in other OECD countries. In many of these (e.g. France, Switzerland), there is no legal end to the operating licence, but continued operation is based on the outcomes of periodic safety reviews. This study analyses technical and economic data on the upgrade and lifetime extension experience in OECD countries. A multi-criteria assessment methodology is used considering various factors and parameters reflecting current and future financial conditions of operation, political and regulatory risks, the state of the plants' equipment and the general role of nuclear power in the country's energy policy. The report shows that long-term operation of nuclear power plants has significant economic advantages for most utilities envisaging LTO programmes. In most cases, the continued operation of NPPs for at least ten more years is profitable even taking into account the additional costs of post-Fukushima modifications, and remains cost-effective compared to alternative replacement sources

  17. Consideration to keep the know-how in the technical divisions in the headquarter of a utility for safe plant operation in the long term

    International Nuclear Information System (INIS)

    Fischer, E.; Willeke, A.; Teichel, H.; Neumann, J.; Peters, J.D.

    2001-01-01

    Special know-how in nuclear technology is and will be a basic element in the business of a utility operating nuclear power plants today and in the future. The acquisition and maintenance of nuclear know-how is necessary to maximize the economic success of the business. The presentation will report about the results of a study carried out by PreussenElektra Kemkraft at the end of 1999. Identified possibilities keeping the nuclear know-how will be discussed, i. e. - maintenance and development of know-how in the existing organisation; - utility overlapping competence center; - commercial know-how agency; - engineering consultant office for other utilities; - cooperation with manufacturers and other utilities, building new nuclear plants; - participation in projects planning new nuclear power plants, as EPR, in a independent project organisation. (authors)

  18. ALARA for nuclear power plant operation

    International Nuclear Information System (INIS)

    Knapp, P.J.

    1979-01-01

    The concept of maintaining radiation exposures as low as reasonably achievable (ALARA) is outlined in connection with nuclear power plant operations. The basis of the concept is reviewed and a specific example of ALARA action is presented. (author)

  19. DFIG-based offshore wind power plant connected to a single VSC-HVDC operated at variable frequency: Energy yield assessment

    International Nuclear Information System (INIS)

    De-Prada-Gil, Mikel; Díaz-González, Francisco; Gomis-Bellmunt, Oriol; Sumper, Andreas

    2015-01-01

    The existence of HVDC (High Voltage Direct Current) transmission systems for remote offshore wind power plants allows devising novel wind plant concepts, which do not need to be synchronized with the main AC grid. This paper proposes an OWPP (offshore wind power plant) design based on variable speed wind turbines driven by DFIGs (doubly fed induction generators) with reduced power electronic converters connected to a single VSC-HVDC converter which operates at variable frequency and voltage within the collection grid. It is aimed to evaluate the influence of the power converter size and wind speed variability within the WPP on energy yield efficiency, as well as to develop a coordinated control between the VSC-HVDC converter and the individual back-to-back reduced power converters of each DFIG-based wind turbine in order to provide control capability for the wind power plant at a reduced cost. To maximise wind power generation by the OWPP, an optimum electrical frequency search algorithm for the VSC-HVDC converter is proposed. Both central wind power plant control level and local wind turbine control level are presented and the performance of the system is validated by means of simulations using MATLAB/Simulink ® . - Highlights: • Influence of converter size and wind speed variability on energy capture efficiency. • Coordinated control between a VSC-HVDC and DFIG WTs with reduced power converters. • Static and dynamic analysis of the performance of the implemented control scheme. • Optimal variable frequency operation to maximize WPP generation at a reduced cost

  20. Value as a parameter to consider in operational strategies for CSP plants

    Science.gov (United States)

    de Meyer, Oelof; Dinter, Frank; Govender, Saneshan

    2017-06-01

    This paper introduced a value parameter to consider when analyzing operational strategies for CSP plants. The electric system in South Africa, used as case study, is severely constrained with an influx of renewables in the early phase of deployment. The energy demand curve for the system is analyzed showing the total wind and solar photovoltaic contributions for winter and summer. Due to the intermittent nature and meteorological operating conditions of wind and solar photovoltaic plants, the value of CSP plants within the electric system is introduced. Analyzing CSP plants based on the value parameter alone will remain only a philosophical view. Currently there is no quantifiable measure to translate the philosophical view or subjective value and it solely remains the position of the stakeholder. By introducing three other parameters, Cost, Plant and System to a holistic representation of the Operating Strategies of generation plants, the Value parameter can be translated into a quantifiable measure. Utilizing the country's current procurement program as case study, CSP operating under the various PPA within the Bid Windows are analyzed. The Value Cost Plant System diagram developed is used to quantify the value parameter. This paper concluded that no value is obtained from CSP plants operating under the Bid Window 1 & 2 Power Purchase Agreement. However, by recognizing the dispatchability potential of CSP plants in Bid Window 3 & 3.5, the value of CSP in the electric system can be quantified utilizing Value Added Relationship VCPS-diagram. Similarly ancillary services to the system were analyzed. One of the relationships that have not yet been explored within the industry is an interdependent relationship. It was emphasized that the cost and value structure is shared between the plant and system. Although this relationship is functional when the plant and system belongs to the same entity, additional value is achieved by marginalizing the cost structure. A

  1. The operating staff of nuclear power plants

    International Nuclear Information System (INIS)

    Schlegel, G.; Christ, W.

    1988-01-01

    The training of its staff is one of the pillars of the safe and economical operation of a power plant. This is why power plant owners began to systematically train their staff already in the 50s, and why they created central training facilities. Staff members who have undergone this training make an indispensable contribution to the acceptedly high safety and availability of German power plants. The substantial cost of creating training facilities and of schooling plant staff is considered to be an investment for the future. Low labour turnover permits careful observation and development of staff and leads to a high standard of knowledge and experience. (orig./HSCH) [de

  2. Computerized operator support system with new man-machine interface for BWR power plants

    International Nuclear Information System (INIS)

    Monta, K.; Naito, N.; Sugawara, M.; Sato, N.; Mori, N.; Tai, I.; Fukumoto, A.; Tsuchida, M.

    1984-01-01

    Improvement of the man-machine interface of nuclear power plants is an important contribution to the further enhancement of operational safety. In addition, recent advances in computer technology seem to offer the greatest opportunity to date for achieving improvement in the man-machine interface. The development of a computerized operator support system for BWRs has been undertaken since 1980 with the support of the Japanese Government. The conceptual design of this system is based on the role of the operators. The main functions are standby system management, disturbance analysis and post-trip operational guidance. The objective of the standby system management is to monitor the standby status of the engineered safety feature during normal operation to assure its proper functioning at the onset of emergency situations. The disturbance analysis system detects disturbances in the plant in their early stages and informs the plant operators about, for example, the cause of the disturbances, the plant status and possible propagations. Consequently, operators can take corrective actions to prevent unnecessary plant shutdown. The objective of the post trip operational guide is to support operators in diagnosis and corrective action after a plant trip. Its functions are to monitor the performance of the engineered safety feature, to identify the plant status and to guide the appropriate corrective action to achieve safe plant shutdown. The information from the computerized operator support system is supplied to operators through a colour CRT operator console. The authors have evaluated the performance of various new man-machine interfacing tools and proposed a new operator console design. A prototype system has been developed and verification/validation is proceeding with a BWR plant simulator. (author)

  3. Influence of in-plant air pollution control measures on power plant and system operation

    International Nuclear Information System (INIS)

    Kurten, H.

    1990-01-01

    The burning of fossil fuels causes the emission of air pollutants which have harmful environmental impact. Consequently many nations have in the last few years established regulations for air pollution control and have initiated the development and deployment of air pollution control systems in power plants. The paper describes the methods used for reducing particulate, SO 2 and NO x emissions, their application as backfit systems and in new plants, the power plant capacity equipped with such systems in the Federal Republic of Germany and abroad and the additional investment and operating costs incurred. It is to be anticipated that advanced power plant designs will produce lower pollutant emissions and less waste at enhanced efficiency levels. A comparison with power generation in nuclear power plants completes the first part of the paper. This paper covers the impact of the above-mentioned air pollution control measures on unit commitment in daily operation

  4. Operational characteristics of nuclear power plants - modelling of operational safety; Pogonske karakteristike nuklearnih elektrana - modelsko izucavanje pogonske sigurnosti

    Energy Technology Data Exchange (ETDEWEB)

    Studovic, M [Masinski fakultet, Beograd (Yugoslavia)

    1984-07-01

    By operational experience of nuclear power plants and realize dlevel of availability of plant, systems and componenst reliabiliuty, operational safety and public protection, as a source on nature of distrurbances in power plant systems and lessons drawn by the TMI-2, in th epaper are discussed: examination of design safety for ultimate ensuring of safe operational conditions of the nuclear power plant; significance of the adequate action for keeping proess parameters in prescribed limits and reactor cooling rquirements; developed systems for measurements detection and monitoring all critical parameters in the nuclear steam supply system; contents of theoretical investigation and mathematical modeling of the physical phenomena and process in nuclear power plant system and components as software, supporting for ensuring of operational safety and new access in staff education process; program and progress of the investigation of some physical phenomena and mathematical modeling of nuclear plant transients, prepared at faculty of mechanical Engineering in Belgrade. (author)

  5. IAEA Leads Operational Safety Mission to Muehleberg Nuclear Power Plant

    International Nuclear Information System (INIS)

    2012-01-01

    Full text: An international team of nuclear safety experts led by the International Atomic Energy Agency today concluded a review of the safety practices at the Muehleberg Nuclear Power Plant (NPP) near Bern in Switzerland. The team noted a series of good practices and made recommendations and suggestions to reinforce them. The IAEA assembled the Operational Safety Review Team at the request of the Swiss government. The team, led by the IAEA's Division of Nuclear Installation Safety, performed an in-depth operational safety review from 8 to 25 October 2012. The team comprised experts from Belgium, the Czech Republic, Finland, Germany, Hungary, Slovakia, Sweden, the United Kingdom and the United States as well as experts from the IAEA. The team conducted an in-depth review of the aspects essential to the safe operation of the Muehleberg NPP. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Training; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry, Emergency Planning and Preparedness, Severe Accident Management and Long-Term Operation. The OSART team made 10 recommendations and 11 suggestions related to areas where operations of Muehleberg NPP could be further improved, for example: - Plant management could improve the operating experience program and methods throughout the plant to ensure corrective actions are taken in a timely manner; - In the area of Long-Term Operation, the ageing management review for some systems and components is not complete and the environmental qualification of originally installed safety cables has not yet been revalidated for long-term operation; and - The plant provisions for the protection of persons on the site during an emergency with radioactive release can be improved to minimize health risks to plant personnel. The team also identified 10 good

  6. Expanding Kenya's protected areas under the Convention on Biological Diversity to maximize coverage of plant diversity.

    Science.gov (United States)

    Scherer, Laura; Curran, Michael; Alvarez, Miguel

    2017-04-01

    Biodiversity is highly valuable and critically threatened by anthropogenic degradation of the natural environment. In response, governments have pledged enhanced protected-area coverage, which requires scarce biological data to identify conservation priorities. To assist this effort, we mapped conservation priorities in Kenya based on maximizing alpha (species richness) and beta diversity (species turnover) of plant communities while minimizing economic costs. We used plant-cover percentages from vegetation surveys of over 2000 plots to build separate models for each type of diversity. Opportunity and management costs were based on literature data and interviews with conservation organizations. Species richness was predicted to be highest in a belt from Lake Turkana through Mount Kenya and in a belt parallel to the coast, and species turnover was predicted to be highest in western Kenya and along the coast. Our results suggest the expanding reserve network should focus on the coast and northeastern provinces of Kenya, where new biological surveys would also fill biological data gaps. Meeting the Convention on Biological Diversity target of 17% terrestrial coverage by 2020 would increase representation of Kenya's plant communities by 75%. However, this would require about 50 times more funds than Kenya has received thus far from the Global Environment Facility. © 2016 Society for Conservation Biology.

  7. Outline and operations of benzene plant

    Energy Technology Data Exchange (ETDEWEB)

    Omori, S; Hirooka, N; Nakamura, M; Goto, T

    1983-01-01

    An account is given of plant which can process 130,000 tonnes of by-product coke oven gas light oil (GLO) per year (via hydrodesulfurization, extraction and distillation) to produce benzene, toluene and xylene. The flowsheets and component equipment of the various production processes are explained, together with special features such as the production of hydrogen from coke oven gas by the PSA process and the processing of GLO by the ARCO process. Plant operation is outlined and the results of performance tests are noted.

  8. The training of operating personnel at Spanish nuclear power plant

    International Nuclear Information System (INIS)

    Diaz, Antonio Burgos

    2011-01-01

    An essential condition in order to ensure that nuclear power plants are operated reliably and safely is the availability in the Control Room of duly qualified persons capable both of preventing accidents and of responding to them should they occur. Training of the Control Room operating crews is accomplished in two major stages: a lengthy process of initial training in which the knowledge acquired at high school and university is built upon, leading to the specialisation required to appropriately carry out the tasks to be performed in the Control Room, and a continuous training program aimed at maintaining and improving the knowledge and skills required to operate the plant, with feedback of the lessons learned from the industry's operating experience. The use of full-scope simulators replicating the physical conditions and environment of the Control Room allows the period of initial training to be reduced and is the most appropriate method for the continuous training program of the control room personnel, since these simulators increase the realism of the training scenarios, help to better understand the response of the plant and provide an accurate idea of transient response times. Tecnatom is the Training Centre for Spanish Operators; it is the 'Operator Training Factory' and its mission is to train the nuclear power plant operating personnel in both technological fundamentals and the development of diagnostic skills through practical scenarios on the simulator and on-the-job training. Our training programmes are based on a SAT (Systematic Approach to Training) methodology that has been implemented at both Spanish and overseas plants. (author)

  9. Job training planning and design for process plant operators

    International Nuclear Information System (INIS)

    Wirstad, J.

    1983-01-01

    A method is presented by which process plant operators for nuclear power plants are trained in Sweden. It works by a top-down method of systems analysis which can be integrated into the analysis, specification, and design of the process automation system. The training methods can also be adapted to existing automation systems and operating schedules. The author's method is based on the principle that training programs should be based on job requirements, e.g. operator tasks in common, less frequent, and rare operating conditions. Procedures have been tested for the following steps: Job analysis, analysis of knowledge and experience required, analysis of operator training requirements, set-up and organisation of the training programme, achievement control, evaluation of the training programme. (orig./HP) [de

  10. Job training planning and design for process plant operators

    Energy Technology Data Exchange (ETDEWEB)

    Wirstad, J.

    1983-01-01

    A method is presented by which process plant operators for nuclear power plants are trained in Sweden. It works by a top-down method of systems analysis which can be integrated into the analysis, specification, and design of the process automation system. The training methods can also be adapted to existing automation systems and operating schedules. The author's method is based on the principle that training programs should be based on job requirements, e.g. operator tasks in common, less frequent, and rare operating conditions. Procedures have been tested for the following steps: Job analysis, analysis of knowledge and experience required, analysis of operator training requirements, set-up and organisation of the training programme, achievement control, evaluation of the training programme.

  11. Evaluating and improving nuclear power plant operating performance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    This report aims to provide the basis for improvements in the understanding of nuclear power plants operation and ideas for improving future productivity. The purpose of the project was to identify good practices of operating performance at a few of the world`s most productive plants. This report was prepared through a series of consultants meetings, a specialists meeting and an Advisory Group meeting with participation of experts from 23 Member States. The report is based on self-assessment of half a dozen plants that have been chosen as representatives of different reactor types in as many different countries, and the views and assessment of the participants on good practices influencing plant performance. Three main areas that influence nuclear power plant availability and reliability were identified in the discussions: (1) management practices, (2) personnel characteristics, and (3) working practices. These areas cover causes influencing plant performance under plant management control. In each area the report describes factors or good practices that positively influence plant availability. The case studies, presented in annexes, contain the plant self-assessment of areas that influence their availability and reliability. Six plants are represented in the case studies: (1) Dukovany (WWER, 1760 MW) in the Czech Republic; (2) Blayais (PWR, 3640 MW) in France; (3) Paks (WWER, 1840 MW) in Hungary; (4) Wolsong 1 (PHWR, 600 MW) in the Republic of Korea; (5) Trillo 1 (PWR, 1066 MW) in Spain; and (6) Limerick (BWR, 2220 MW) in the United States of America Figs, tabs

  12. Pilot plant UF6 to UF4 test operations report

    International Nuclear Information System (INIS)

    Bicha, W.J.; Fallings, M.; Gilbert, D.D.; Koch, G.E.; Levine, P.J.; McLaughlin, D.F.; Nuhfer, K.R.; Reese, J.C.

    1987-02-01

    The FMPC site includes a plant designed for the reduction of uranium hexafluoride (UF 6 ) to uranium tetrafluoride (UF 4 ). Limited operation of the upgraded reduction facility began in August 1984 and continued through January 19, 1986. A reaction vessel ruptured on that date causing the plant operation to be shut down. The DOE conducted a Class B investigation with the findings of the investigation board issued in preliminary form in May 1986 and as a final recommendation in July 1986. A two-phase restart of the plant was planned and implemented. Phase I included implementing safety system modifications, changing reaction vessel temperature control strategy, and operating the reduction plant under an 8-week controlled test. The results of the test period are the subject of this report. 41 figs., 11 tabs

  13. Application of AI technology to nuclear plant operations

    International Nuclear Information System (INIS)

    Sackett, J.I.

    1988-01-01

    In this paper, applications of Artificial Intelligence (AI) Technology to nuclear-power plant operation are reviewed. AI Technology is advancing rapidly and in the next five years is expected to enjoy widespread application to operation, maintenance, management and safety. Near term emphasis on a sensor validation, scheduling, alarm handling, and expert systems for procedural assistance. Ultimate applications are envisioned to culminate in autonomous control such as would be necessary for a power system in space, where automatic control actions are taken based upon reasoned conclusions regarding plant conditions, capability and control objectives

  14. 14th Biennial conference on reactor operating experience plant operations: The human element

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    Separate abstracts were prepared for the papers presented in the following areas of interest: enhancing operator performance; structured approaches to maintenance standards and reliability-centered maintenance; human issues in plant operations and management; test, research, and training reactor utilization; methods and applications of root-cause analysis; emergency operating procedure enhancement programs; test, research, and training reactor upgrades; valve maintenance and diagnostics; recent operating experiences; and current maintenance issues

  15. The optimization of nuclear power plants operation modes in emergency situations

    Science.gov (United States)

    Zagrebayev, A. M.; Trifonenkov, A. V.; Ramazanov, R. N.

    2018-01-01

    An emergency situations resulting in the necessity for temporary reactor trip may occur at the nuclear power plant while normal operating mode. The paper deals with some of the operation c aspects of nuclear power plant operation in emergency situations and during threatened period. The xenon poisoning causes limitations on the variety of statements of the problem of calculating characteristics of a set of optimal reactor power off controls. The article show a possibility and feasibility of new sets of optimization tasks for the operation of nuclear power plants under conditions of xenon poisoning in emergency circumstances.

  16. Quantization with maximally degenerate Poisson brackets: the harmonic oscillator!

    International Nuclear Information System (INIS)

    Nutku, Yavuz

    2003-01-01

    Nambu's construction of multi-linear brackets for super-integrable systems can be thought of as degenerate Poisson brackets with a maximal set of Casimirs in their kernel. By introducing privileged coordinates in phase space these degenerate Poisson brackets are brought to the form of Heisenberg's equations. We propose a definition for constructing quantum operators for classical functions, which enables us to turn the maximally degenerate Poisson brackets into operators. They pose a set of eigenvalue problems for a new state vector. The requirement of the single-valuedness of this eigenfunction leads to quantization. The example of the harmonic oscillator is used to illustrate this general procedure for quantizing a class of maximally super-integrable systems

  17. Study of operating procedures in nuclear power plants: Practices and problems

    International Nuclear Information System (INIS)

    Morgenstern, M.H.; Barnes, V.E.; McGuire, M.V.; Radford, L.R.; Wheeler, W.A.

    1987-02-01

    This report describes the project activities, findings, and recommendations of a project entitled ''Program Plan for Assessing and Upgrading Operating Procedures for Nuclear Power Plants.'' The project was performed by the Pacific Northwest Laboratory and Battelle Human Affairs Research Centers for the Division of Human Factors Technology, Office of Nuclear Reactor Regulation, US Nuclear Regulatory Commission (NRC). The project team analyzed and evaluated samples of normal and abnormal operating procedures from 31 commercial nuclear power plant sites operating in the United States. The project team also visited nine nuclear power plants in the United States to obtain information on the development, use, and control of operating procedures. A peer review group was convened to advise the project team on the conduct of the project and to review and comment on the project report. The report contains findings on the usability of operating procedures and on practices concerning the development, use, an control of operating procedures in nuclear power plants. The report includes recommendations to the NRC on the need to upgrade the quality of operating procedures. The report also discusses an approach to a program plan to assess and upgrade operating procedures

  18. Renewal of JOYO plant operation management expert tool (JOYPET)

    International Nuclear Information System (INIS)

    Okawa, Toshikatsu; Aita, Tsuyoshi; Murakami, Takanori; Ito, Hideaki; Aoki; Hiroshi; Oda, Toshihiro

    2004-03-01

    JOYO Plant Operation Management Expert Tool system named JOYPET has been developed with the aim of confirming the stable and safety operation of JOYO and improving operational reliability in future FBR plants. New JOYPET system was designed and manufactured in 2002, and began on operation in 2003, because the former system, which was designed in 1988 and operated from 1991 to 2002, was superannuated, and it was difficult to obtain alternative hardwares and replace parts. The difference between the former system and the later new one was adopted the web-online system to use LAN (Local Area Network) instead of the host and the terminal computer system. Then the new system enabled to take unitary document management for reactor operation, and each person was able to search, refer and make document on line directly. This paper summarized the new JOYPET system design, manufacturing, system constitution and operation actual result. (author)

  19. Operational margin monitoring system for boiling water reactor power plants

    International Nuclear Information System (INIS)

    Fukutomi, S.; Takigawa, Y.

    1992-01-01

    This paper reports on an on-line operational margin monitoring system which has been developed for boiling water reactor power plants to improve safety, reliability, and quality of reactor operation. The system consists of a steady-state core status prediction module, a transient analysis module, a stability analysis module, and an evaluation and guidance module. This system quantitatively evaluates the thermal margin during abnormal transients as well as the stability margin, which cannot be evaluated by direct monitoring of the plant parameters, either for the current operational state or for a predicted operating state that may be brought about by the intended operation. This system also gives operator guidance as to appropriate or alternate operations when the operating state has or will become marginless

  20. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1992-05-01

    The Finnish nuclear power plant units Loviisa 1 and 2 as well as TVO I and II were in operation for almost the whole fourth quarter of 1991. The load factor average was 94.7 % (the whole year 90.9 %). All the events in the last annual quarter, which are classified on the International Nuclear Event Scale, were below scale/level 0. Also the events which occurred in the other quarters of the year 1991 were rated at the scale's lowest levels. Occupational radiation doses and releases of radioactive material off-site remained well below authorised limits. Only quantities of radioactive material insignificant to radiation exposure originating in nuclear power plants were detected in the samples collected in the vicinity of the nuclear power plants

  1. Life Limiting Issues for Long Term Operation of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Esselman, Thomas; Gaertner, John

    2012-01-01

    This paper reports on a study which identified and characterized life limiting issues for consideration by nuclear plant owners in their decision to extend plant life or seek subsequent license renewal. As nuclear plants operate for longer periods, the risk that a condition in the plant or an event that occurs, at the plant or elsewhere, will cause a plant owner not to extend plant life increases. The Fukushima accident has made this concept concrete. This paper defines 'Life Limiting' concepts for nuclear plants. It identifies the highest risk conditions and events that may limit duration of continued operation in nuclear plants and employs a survey to prioritize these concerns. Methods for evaluating these risks and changing the capability of systems, structures, and components (SSC) to reduce and manage this risk in long term operation are presented. Integrated obsolescence -the existence of an accumulation of events or condition that can threaten long term operation- is discussed. Many of the life limiting conditions or events may be controllable by early identification, recognition, and mitigation of the potential threat. The recognition of conditions may allow measures to be taken to mitigate the condition. Recognition of the potential for events that may be life limiting may allow actions to be taken that will minimize the likelihood or consequences of the event. These actions may include enhanced research on the expected behavior of the SSC, risk assessment and management, and enhanced monitoring and aging management at the plant. (author)

  2. An information offering system for operation support based on plant functional structure

    International Nuclear Information System (INIS)

    Ohga, Yukiharu; Seki, Hiroshi

    1995-01-01

    A plant information offering system was proposed to support operators in their selection and confirmation of the required information for plant operation under transient conditions in nuclear power plants. The system features include an automatic selection method for information and a dialog input method. The former selects plant information in response to plant status changes and operators' demands. The selection is performed based on the knowledge and data as structured by the plant functional structure; i.e. a means-ends abstraction hierarchy model. In the latter, both speech and CRT touch inputs are transformed into words in Japanese to realize an arbitrary input mode combination. The words are analyzed as a sentence before transforming them into a demand for related programs. A prototype system was evaluated using a BWR simulator, assuming abnormal transients such as loss of feedwater. The contents of the offered information were checked based on emergency operation guidelines. It was confirmed that appropriate information items are automatically selected in real time. Answers are generated in reply to the operators' demands. They include information added to reflect the plant conditions. As for dialog, simple and quick input is realized by combining speech and CRT touch according to the operating situation. (author)

  3. Assuring human operator alertness at night in power plants

    International Nuclear Information System (INIS)

    Moore-Ede, M.C.

    1988-01-01

    The human body is not designed for peak alertness and performance at night, nor is it well-equipped to cope with the frequent day-night inversions required by rotating shift work schedules. As a result, the human operator can become the weak link in a complex technological operation such as a nuclear power plant. The high degree of dependence on human operator vigilance, decision-making ability and performance that is required in nuclear power plant operations can conflict with the human sleepiness and error-proneness which naturally occur during the night shift or after extended periods without adequate sleep. An opportunity to address these problems has come from a series of major research advances in basic circadian physiology

  4. The Development of Plant Maintenance Scheduling Via lnventory System for Sustainable Plant Operation

    Directory of Open Access Journals (Sweden)

    Masripan Roslizan

    2016-01-01

    Full Text Available Industrial sector becomes the main concern for developing country. By the time, it was increased rapidly. However, there are many problems observed such as maintenance scheduling, stock inventory and supply chain. Therefore, this research develops new inventory system to develop sustainable plant operation with a high capability to plant operation especially to stock inventory of machine component. In also required green application with minimised used on paper. This system is developed using Radio Frequency Identification (RFID for inventory control which integrated with web-based system. This system consists of several modules such as station module, item module and item request module and report of critical stock in the store. This system can be controlled from a hand-phone with internet connection or automatic alert such as Short Massage Send (SMS and email. The developed system is very effective in monitoring the stock material through the barcode, supply chain and worker performance as well as to reduce the lead time for maintenance activities of the company through sustainable plant operation.

  5. Improving CANDU plant operation and maintenance through retrofit information technology systems

    International Nuclear Information System (INIS)

    Lupton, L.R.; Judd, R.A.; MacBeth, M.J.

    1998-01-01

    CANDU plant owners are facing an increasingly competitive environment for the generation of electricity. To meet this challenge, all owners have identified that information technology offers opportunities for significant improvements in CANDU operation, maintenance and administration (OM and A) costs. Targeted information technology application areas include instrumentation and control, engineering, construction, operations and plant information management. These opportunities also pose challenges and issues that must be addressed if the full benefits of the advances in information technology are to be achieved. Key among these are system hardware and software maintenance, and obsolescence protection; AECL has been supporting CANDU stations with the initial development and evaluation of systems to improve plant performance and cost. Key initiatives that have been implemented or are in the process of being implemented in some CANDU plants to achieve operational benefits include: critical safety parameter monitor system; advanced computerized annunciation system; plant historical data system; and plant display system. Each system will be described in terms of its role in enhancing current CANDU plant performance and how they will contribute to future CANDU plant performance

  6. A study on the operator's communication pattern characteristics under abnormal operating situation of nuclear power plants

    International Nuclear Information System (INIS)

    Kim, S. H.; Park, J.

    2008-01-01

    The quality of a probabilistic safety assessment (PSA) has become more important and a human reliability analysis (HRA) is known as a major contributor to the uncertainty of a PSA. As a part of enhancing the HRA quality, a study was initiated to find out characteristics of communication pattern and to evaluate communication quality of the operators of nuclear power plants. Korea Atomic Energy Research Institute (KAERI) is developing evaluation methods for the effect of human-induced events on risk/performance. This paper describes a study on the operator's communication pattern characteristics under abnormal operating situation of nuclear power plants. The study was carried out in four stages; 1) Video recording 2) Audio scripting 3) Message Classification 4) Communication Pattern Analysis. We recorded eight abnormal simulator training programs from Younggwang nuclear power plant training center. After that we performed message classification and carried out communication pattern analysis. We compared communication patterns of abnormal operating situation with emergency operating situation.As results of analysis, the role of SRO (senior reactor operator) under abnormal operating situation was decreased than the activities under emergency operating situation because each operator (reactor operator, turbine operator, safety supervisor) in main control room (MCR) performs the activity to control by himself with corresponding field engineers with his basic knowledge of the system. On the other hand, the operator's decision making processes and activities under abnormal operating situation were dramatically increased than the emergency operating situation. (authors)

  7. Power ramping/cycling experience and operational recommendations in KWU power plants

    International Nuclear Information System (INIS)

    Jan, R. von; Wunderlich, F.; Holzer, R.

    1980-01-01

    The power cycling and ramping experience of KWU is based on experiments in test and commercial reactors, and on evaluation of plant operation (PHWR, PWR and BWR). Power cycling of fuel rods have never lead to PCI failures. In ramping experiments, for fast ramps PCI failure thresholds of 480/420 W/cm are obtained at 12/23 GWd/t(U) burn-up for pressurized PWR fuel. No failures occurred during limited exceedance of the threshold with reduced ramp rate. Operational recommendations used by KWU are derived from experiments and plant experience. The effects of ramping considerations on plant operation is discussed. No rate restrictions are required for start-ups during an operating cycle or load follow operation within set limits for the distortion of the local power distribution. In a few situations, e.g. start-up after refueling, ramp rates of 1 to 5 %/h are recommended depending on plant and fuel design

  8. Professional adaptability of nuclear power plant operators

    International Nuclear Information System (INIS)

    He Xuhong; Huang Xiangrui

    2006-01-01

    The paper concerns in the results of analysis for nuclear power plant (NPP) operator job and analysis for human errors related NPP accidents. Based on the principle of ergonomics a full psychological selection system of the professional adaptability of NPP operators including cognitive ability, personality and psychological health was established. The application way and importance of the professional adaptability research are discussed. (authors)

  9. Training device for nuclear power plant operators

    International Nuclear Information System (INIS)

    Schoessow, G. J.

    1985-01-01

    A simulated nuclear energy power plant system with visible internal working components comprising a reactor adapted to contain a liquid with heating elements submerged in the liquid and capable of heating the liquid to an elevated temperature, a steam generator containing water and a heat exchanger means to receive the liquid at an elevated temperature, transform the water to steam, and return the spent liquid to the reactor; a steam turbine receiving high energy steam to drive the turbine and discharging low energy steam to a condenser where the low energy steam is condensed to water which is returned to the steam generator; an electric generator driven by the turbine; indicating means to identify the physical status of the reactor and its contents; and manual and automatic controls to selectively establish normal or abnormal operating conditions in the reactor, steam generator, pressurizer, turbine, electric generator, condenser, and pumps; and to be selectively adjusted to bring the reactor to acceptable operating condition after being placed in an abnormal operation. This device is particularly useful as an education device in demonstrating nuclear reactor operations and in training operating personnel for nuclear reactor systems and also as a device for conducting research on various safety systems to improve the safety of nuclear power plants

  10. Improvement of operational efficiency based on fast startup plant concepts

    Energy Technology Data Exchange (ETDEWEB)

    Kurz, Harald; Meinecke, Gero; Ohresser, Sylvia; Pickard, Andreas

    2010-09-15

    One of the major global challenges of the present time is the reduction of CO2 emissions. Provisions for integration of a CO2 capture plant are already required today in new power plant construction projects in order to enable current plants to also benefit from the possibilities of carbon capture systems to be developed in the future. These provisions for integration should account for the fact that the scrubbing processes are still in the optimization phase. Requisite process parameters may still change in the future. In the development of a plant interface, the paper describes a concept developed by Siemens which ensures maximum flexibility with simultaneous optimization of the plant for the capture process. Emphasis was placed on the following points in the development of this interface and the associated connection concepts: Maximum plant efficiency before and after modification; Maximum flexibility with regard to future process parameters; Optimization of customer investment cash flow; and, Applicability also to existing plants. According to the paper, Siemens can offer a concept which enables future conversion in accordance with the specified criteria. This concept requires no compromises with regard to plant efficiency in process optimization for either current power plant operation without carbon capture or for future operation with carbon capture. The concept also enables retrofitting of existing plants which are not yet capture-ready. However, retrofitting of power plants which are not prepared for operation with carbon capture is considerably more elaborate in most cases, as corridors must frequently still be cleared for the connecting piping.

  11. Nuclear Power Plant Operating Experience from the IAEA/NEA International Reporting System for Operating Experience 2012-2014

    International Nuclear Information System (INIS)

    2018-03-01

    The International Reporting System for Operating Experience (IRS) is an essential element of the international operating experience feedback system for nuclear power plants. Its fundamental objective is to contribute to improving safety of commercial nuclear power plants which are operated worldwide. IRS reports contain information on events of safety significance with important lessons learned which assist in reducing recurrence of events at other plants. This sixth publication, covering the period 2012 - 2014, follows the structure of the previous editions. It highlights important lessons based on a review of the approximately 240 event reports received from the participating countries over this period.

  12. Operating experience from Swedish nuclear power plants

    International Nuclear Information System (INIS)

    1998-01-01

    During 1997 the PWRs in Ringhals performed extremely well (capability factors 85-90%), the unit Ringhals 2 reached the best capability factor since commercial operation started in 1976. The BWRs made an average 76% capability, which is somewhat less than in 1996. The slightly reduced capability derives from ongoing modernization projects at several units. At the youngest plants, Forsmark 3 and Oskarshamn 3, capability and utilization were very high. Events and data for 1997 are given for each reactor, together with operational statistics for the years 1990-1997. A number of safety-related events are reported, which occurred st the Swedish plants during 1997. These events are classified as level 1 or higher on the international nuclear event scale (INES)

  13. Operating experience from Swedish nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-06-01

    During 1997 the PWRs in Ringhals performed extremely well (capability factors 85-90%), the unit Ringhals 2 reached the best capability factor since commercial operation started in 1976. The BWRs made an average 76% capability, which is somewhat less than in 1996. The slightly reduced capability derives from ongoing modernization projects at several units. At the youngest plants, Forsmark 3 and Oskarshamn 3, capability and utilization were very high. Events and data for 1997 are given for each reactor, together with operational statistics for the years 1990-1997. A number of safety-related events are reported, which occurred st the Swedish plants during 1997. These events are classified as level 1 or higher on the international nuclear event scale (INES).

  14. Using management of aging in German nuclear power plants - aspects of KTA 1403 pertaining to residual power operation, post-shutdown operation and residual operation

    International Nuclear Information System (INIS)

    Barreiro, Pablo; Bever, Thomas; Brast, Gerhard; Elsche, Bjoern; Reese, Sven H.; Grossmann, Patrick; Widera, Martin; Huettner, Frank; Linnemann, Thomas; Smit, Swen-Olaf; Zander, Ralf-Michael

    2013-01-01

    Management of aging in nuclear power plants originated in the United States of America and became a topic of debate in Germany from the late 1990s onward. On the basis of the existing plant-specific measures practiced comprehensively, KTA 1403, ''Management of Aging in Nuclear Power Plants'', was drafted and finalized in 2010. This publication first presents the context of AM with regard to German nuclear power plants, including references to national and international historical developments. Against this backdrop, the difference between management of aging and lifetime management is discussed next. This is followed by a description of the status of the AM process in nuclear power plants currently in operation, especially organizational plant-specific implementation. As a consequence of the decision by the German federal government to discontinue the peaceful use of nuclear power in Germany and the associated 13th amendment to the Atomic Energy Act of July 31, 2011, a considerable part of the German nuclear power plant park already lost its right of power operation. In this situation, aspects of AM are discussed for plants in the no-power, post-operation and residual operation phases. Finally, experience accumulated in plant-specific execution of the AM process on the basis of KTA 1403 is considered and summarized.

  15. Track 6: safety and risk management. Plant operational risk management. Plant Configuration Risk Assessment Methodology Development for Periodic Maintenance

    International Nuclear Information System (INIS)

    Yang, Huichang; Chung, Chang Hyun; Sung, Key Yong

    2001-01-01

    As the operation experiences of nuclear power plants (NPPs) in Korea accumulate and NPP safety functions become enhanced, the role of stable and optimal NPP operation within acceptable safety criteria becomes important at present. To accomplish the goal of safe and optimal operation, maintenance and its related activities should be regarded as the issues of most concern. Studies of methodologies for maintenance improvement and optimization have focused on system performance rather than on the hardware itself. From this point of view, the probabilistic methods are most useful. In terms of risk including core damage frequency and unavailability, the cause that might impact plant safety during normal maintenance activities can be identified and evaluated effectively. The results from these probabilistic analyses can provide insightful information for the reallocation of risk-contributing maintenance activity. This information can be utilized in a way that separates the significant risk-contributing maintenance activities from each other unless they are timely related. In Korea, the risk-monitoring program for operating NPPs is under development and will be implemented in 2003. To accomplish the risk-monitoring program objectives, suitable risk evaluation methods should be developed before the implementation of the risk-monitoring program. The plant configuration assessment methodology was developed for these reasons, and this method is to incorporate the field experiences into the risk calculation exactly within the limit of probabilistic methods. During normal plant operation, the plant operational risk changes frequently depending on the status of the plant system and the arrangement of the components. Specific plant systems or components are typically removed from service because of random equipment failure, planned preventive/predictive maintenance, corrective maintenance, surveillance testing, and operational bypass activities, and such events usually impact the

  16. IAEA Leads Operational Safety Mission to Armenian Nuclear Power Plant

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has reviewed the Armenian Nuclear Power Plant (ANPP) near Metsamor for its safety practices and has noted a series of good practices, as well as recommendations to reinforce them. The IAEA assembled an international team of experts at the request of the Government of the Republic of Armenia to conduct an Operational Safety Review (OSART) of the NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety, the OSART team performed an in-depth operational safety review from 16 May to 2 June 2011. The team was made up of experts from Finland, France, Lithuania, Hungary, Netherlands, Slovakia, UK, USA, EC and the IAEA. An OSART mission is designed as a review of programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the plant's overall safety status. Experts participating in the IAEA's June 2010 International Conference on Operational Safety of Nuclear Power Plants (NPP) reviewed the experience of the OSART programme and concluded: In OSART missions NPPs are assessed against IAEA safety standards which reflect the current international consensus on what constitutes a high level of safety; and OSART recommendations and suggestions are of utmost importance for operational safety improvement of NPPs. Armenia is commended for openness to the international nuclear community and for actively inviting IAEA safety review missions to submit their activities to international scrutiny. Examples of IAEA safety reviews include: Design Safety Review in 2003; Review of Probabilistic Safety Assessment in 2007; and Assessment of Seismic Safety Re-Evaluation in 2009. The team at ANPP conducted an in-depth review of the aspects essential to the safe operation of the plant, which is largely under the control of the site management

  17. Challenges in long-term operation of nuclear power plants - Implications for regulatory bodies

    International Nuclear Information System (INIS)

    Soda, Kunihisa; Van Wonterghem, Frederik; Khouaja, Hatem; Vilpas, Martti; Osouf, Nicolas; Harikumar, S.; Ishigaki, Hiroki; Osaki, Toru; Yamada, Tomoho; Carlsson, Lennart; Shepherd, David; Galloway, Melanie; Liszka, Ervin; Svab, Miroslav; Pereira, Ken; Huerta, Alejandro

    2012-01-01

    Nuclear power reactors have become a major source of electricity supply in many countries in the past half a century. Based on this experience, many operators have sought and have received authorisation for long-term operation, whereby plant operation continues beyond the period considered in the design of the plant. Acceptance of a nuclear power plant for extended service should be based on assurance of the fitness of the plant and the operator for safe and reliable operation over the entire period considered for long-term operation. This assurance may be obtained by establishment of appropriate regulatory requirements, specification of goals and safety levels and regulatory assessment and oversight of the operator's programme for long-term operation. The operators and regulators should ensure that operating experience continues to be evaluated during long-term operation to ensure that any relevant lessons are effectively applied. Other considerations for assurance of safe operation are effective management of ageing, possible need for safety improvements, application of lessons learnt from operating experience, evaluation of environmental impacts, adequate staff resources and performance, review of security at the plant, action in response to emerging issues, and openness and transparency in the transition to long-term operation. Even though most of these considerations are addressed under the regulatory framework that applies to the initial operating period, additional regulatory activities in these areas may be necessary for long-term operation. Although there can be significant differences in regulatory approaches used by different countries for evaluating acceptability of long-term operation, there is general agreement on the purposes and goals of the regulatory reviews. An authorisation of long-term operation could involve a licence renewal or a periodic safety review or an approach that melds elements of both. This report presents guidance that is intended

  18. Training for operators and plant management

    International Nuclear Information System (INIS)

    Laverge, J.; Moroni, J.M.

    1992-01-01

    For many years, EDF has been making a lot of efforts to develop and to provide appropriate training to each of the different categories of personnel who participate in nuclear power plants operation and maintenance. With regard to training related to incidents and accidents management, if is important, among others, to make the difference between training of personnel on shift (plant operating teams and safety engineers) and training of personnel who makes up the emergency response teams that would be called upon in the event of a nuclear accident. Because of different origins, different backgrounds and especially different functions if an accident occurs on a unit, these two populations need completely different trainings. The training that EDF provides to these two categories of personnel is presented separately in the following pages. In both cases, links between functions to be sustained and characteristics of the training are tried to be shown. In conclusion, general perspectives on training evolution in EDF are given. 8 refs

  19. Diagnosis techniques of the computerized operator support system (COSS) for PWR plants

    International Nuclear Information System (INIS)

    Tani, Mamoru; Yoshimura, Tokuji; Morimoto, Haruki; Fujiwara, Toshitaka; Okamoto, Yoshizo; Masui, Takao.

    1985-01-01

    Aiming at the enhancement of abnormal plant operation reliability, COSS has been developed through the support of the Japanese ministry of International Trade and Industry. The validation test was performed by the plant operators using a plant simulator and the result shows that COSS is useful as operator support aids during abnormal plant conditions. This paper presents two methods of diagnosis used in the COSS. (1) Cause-Consequence Tree: This is a logical treewise expression between cause and it's effect to plant variables. When plant variables exceed the predetermined values of alarm, diagnosis is performed by CCT. (2) Model reference method: In this method, the plant dynamic model is applied as a reference. Diagnosis is performed by comparing the measured values with the output values of the corresponding model. (author)

  20. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1993-09-01

    Quarterly reports on the operation of Finnish nuclear power plants describe events and observations, relating to nuclear safety and radiation protection which the Finnish Centre for Radiation and Nuclear Safety considers safety significant. Safety-enhancing modifications at the nuclear power plants and issues relating to the use of nuclear energy which are of general interest are also reported. The reports include a summary of the radiation safety of plant personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the first quarter of 1993, a primary feedwater system pipe break occurred at Loviisa 2, in a section of piping after a feedwater pump. The break was erosion-corrosion induced. Repairs and inspections interrupted power generation for seven days. On the International Nuclear Event Scale the event is classified as a level 2 incident. Other events in the first quarter of 1993 had no bearing on nuclear safety and radiation protection

  1. Power control strategy of a photovoltaic power plant for microgrid applications

    Energy Technology Data Exchange (ETDEWEB)

    Li, Peng [Ecole Centrale de Lille, Cite Scientifique, Villeneuve d' Ascq (FR). Laboratoire d' Electrotechnique et d' Electronique de Puissance de Lille (L2EP); Ecole Nationale Superieure d' Arts et Metiers, Lille (FR). Laboratoire d' Electrotechnique et d' Electronique de Puissance de Lille (L2EP); Francois, Bruno [Ecole Centrale de Lille, Cite Scientifique, Villeneuve d' Ascq (FR). Laboratoire d' Electrotechnique et d' Electronique de Puissance de Lille (L2EP); Degobert, Philippe [Ecole Nationale Superieure d' Arts et Metiers, Lille (FR). Laboratoire d' Electrotechnique et d' Electronique de Puissance de Lille (L2EP); Robyns, Benoit [Hautes Etudes d' Ingenieur, Lille (FR). Laboratoire d' Electrotechnique et d' Electronique de Puissance de Lille (L2EP)

    2008-07-01

    Photovoltaic power plants operates currently maximal power point tracking (MPPT). For microgrid applications, however, a PV power plant can not operate in the MPPT mode in all conditions. When a microgrid is islanded from the grid with few loads, a limitation of the produced power by PV plants is required and prescribed by the Distribution System Operator. This paper proposes a power control technique integrated into a dynamic model of a PV power plant by using equivalent continuous models of power electronic converters. The power limitation mode of the PV is performed by applying the correct PV terminal voltage, which corresponds to the prescribed power reference. The proposed global model is validated by simulations with the help of Matlab-Simulink trademark. (orig.)

  2. Inertial Fusion Power Plant Concept of Operations and Maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Anklam, T. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Knutson, B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Dunne, A. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Kasper, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Sheehan, T. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Lang, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Roberts, V. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Mau, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-01-15

    Parsons and LLNL scientists and engineers performed design and engineering work for power plant pre-conceptual designs based on the anticipated laser fusion demonstrations at the National Ignition Facility (NIF). Work included identifying concepts of operations and maintenance (O&M) and associated requirements relevant to fusion power plant systems analysis. A laser fusion power plant would incorporate a large process and power conversion facility with a laser system and fusion engine serving as the heat source, based in part on some of the systems and technologies advanced at NIF. Process operations would be similar in scope to those used in chemical, oil refinery, and nuclear waste processing facilities, while power conversion operations would be similar to those used in commercial thermal power plants. While some aspects of the tritium fuel cycle can be based on existing technologies, many aspects of a laser fusion power plant presents several important and unique O&M requirements that demand new solutions. For example, onsite recovery of tritium; unique remote material handling systems for use in areas with high radiation, radioactive materials, or high temperatures; a five-year fusion engine target chamber replacement cycle with other annual and multi-year cycles anticipated for major maintenance of other systems, structures, and components (SSC); and unique SSC for fusion target waste recycling streams. This paper describes fusion power plant O&M concepts and requirements, how O&M requirements could be met in design, and how basic organizational and planning issues can be addressed for a safe, reliable, economic, and feasible fusion power plant.

  3. Operation control device for nuclear power plants

    International Nuclear Information System (INIS)

    Suto, Osamu.

    1982-01-01

    Purpose: To render the controlling functions of a central control console more centralized by constituting the operation controls for a nuclear power plant with computer systems having substantially independent functions such as those of plant monitor controls, reactor monitor management and CRT display and decreasing interactions between each of the systems. Constitution: An input/output device for the input of process data for a nuclear power plant and indication data for a plant control console is connected to a plant supervisory and control computer system and a display computer system, the plant supervisory control computer system and a reactor and management computer system are connected with a CRT display control device, a printer and a CRT display input/output device, and the display computer system is connected with the CRT display control device and the CRT display unit on the central control console, whereby process input can be processed and displayed at high speed. (Yoshino, Y.)

  4. Quantitative evaluation for training results of nuclear plant operator on BWR simulator

    International Nuclear Information System (INIS)

    Sato, Takao; Sato, Tatsuaki; Onishi, Hiroshi; Miyakita, Kohji; Mizuno, Toshiyuki

    1985-01-01

    Recently, the reliability of neclear power plants has largely risen, and the abnormal phenomena in the actual plants are rarely encountered. Therefore, the training using simulators becomes more and more important. In BWR Operator Training Center Corp., the training of the operators of BWR power plants has been continued for about ten years using a simulator having the nearly same function as the actual plants. The recent high capacity ratio of nuclear power plants has been mostly supported by excellent operators trained in this way. Taking the opportunity of the start of operation of No.2 simulator, effort has been exerted to quantitatively grasp the effect of training and to heighten the quality of training. The outline of seven training courses is shown. The technical ability required for operators, the items of quantifying the effect of training, that is, operational errors and the time required for operation, the method of quantifying, the method of collecting the data and the results of the application to the actual training are described. It was found that this method is suitable to quantify the effect of training. (Kako, I.)

  5. Operating boundaries of full-scale advanced water reuse treatment plants: many lessons learned from pilot plant experience.

    Science.gov (United States)

    Bele, C; Kumar, Y; Walker, T; Poussade, Y; Zavlanos, V

    2010-01-01

    Three Advanced Water Treatment Plants (AWTP) have recently been built in South East Queensland as part of the Western Corridor Recycled Water Project (WCRWP) producing Purified Recycled Water from secondary treated waste water for the purpose of indirect potable reuse. At Luggage Point, a demonstration plant was primarily operated by the design team for design verification. The investigation program was then extended so that the operating team could investigate possible process optimisation, and operation flexibility. Extending the demonstration plant investigation program enabled monitoring of the long term performance of the microfiltration and reverse osmosis membranes, which did not appear to foul even after more than a year of operation. The investigation primarily identified several ways to optimise the process. It highlighted areas of risk for treated water quality, such as total nitrogen. Ample and rapid swings of salinity from 850 to 3,000 mg/l-TDS were predicted to affect the RO process day-to-day operation and monitoring. Most of the setpoints used for monitoring under HACCP were determined during the pilot plant trials.

  6. Research on professional adaptability psychological selection indices of nuclear power plant operators

    International Nuclear Information System (INIS)

    Liu Jingquan; Li Zhe; Li Maoyou

    2010-01-01

    Based on the analysis of the work characteristics of nuclear power plant operators and the comparison of professional psychological selection indices for different occupations, the indices of psychological selection system which is applicable to nuclear power plant operators are proposed in this paper, using the method named 'taking classes,cross-comparison'. The index results of the suggested psychological selection system reflects all the professional requirements on the nuclear power plant operators, which can also be used for the recruitment, training and the retraining programs for operators. (authors)

  7. Theory model and experiment research about the cognition reliability of nuclear power plant operators

    International Nuclear Information System (INIS)

    Fang Xiang; Zhao Bingquan

    2000-01-01

    In order to improve the reliability of NPP operation, the simulation research on the reliability of nuclear power plant operators is needed. Making use of simulator of nuclear power plant as research platform, and taking the present international reliability research model-human cognition reliability for reference, the part of the model is modified according to the actual status of Chinese nuclear power plant operators and the research model of Chinese nuclear power plant operators obtained based on two-parameter Weibull distribution. Experiments about the reliability of nuclear power plant operators are carried out using the two-parameter Weibull distribution research model. Compared with those in the world, the same results are achieved. The research would be beneficial to the operation safety of nuclear power plant

  8. Closing the loops between plant design and operator-An automatic logging system

    International Nuclear Information System (INIS)

    Tally, C.

    1985-01-01

    The close relationship between plant owner and NSSS designer frequently ceases after the plant is through startup testing. Thus, there is no continuous feedback between the operations staff and the designer. As a result, there is no assurance that the plant is being operated within the design envelope defined by the NSSS component stress reports. The link between plant operation and the plant design basis is vital to ensure that the plant can be safely operated for its full licensed life. This link is also a key to extending the life of the plant since the fatigue history of critical components is an important element of any justification for extended component life. An allowable Operating Transient Cycles Program established by Duke Power and Babcock and Wilcox successfully closed the operator-designer loop at the Oconee Nuclear Station. This paper describes that program, some of its conclusions, and also describes the next logical step in its development...automation of the transient logging process. A transient monitoring program must satisfy many requirements ranging from sensing the onset of a transient or slow power maneuver to recording sufficient data to provide for human checking of all computerized conclusions and results. Although not yet available to the industry, this type of program will ultimately be a virtual necessity for all nuclear stations

  9. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1990-03-01

    In the Quarterly Reports on the operation of the Finnish nuclear power plants such incidents and observations are described relating to nuclear and radiation safety which the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, considers safety-related. During the third quarter of 1989 the Finnish nuclear power plant units Loviisa 1 and 2 and TVO I and II were in commercial operation for most of the time. Nuclear electricity accounted for 39.0% of the total Finnish electricity production in this quarter. The load factor average of the nuclear power plant units was 78.9%. At Loviisa 1, two holes were found in the feedwater distributor of one steam generator. Corresponding wall thinning corrosion was also detected in the walls of two other distributors. The holes were found on the feedwater distributor upper surface in the joint of the secondary circuit feedwater pipe. One hole was about 20 mm x 50 mm in size and the other was a pit hole ca 5 mm in diameter. Metal power had entered the primary circuit at TVO I. This was observed during a post-scram plant start-up. Several control rod drive units had become jammed so tight that control rod withdrawal failed. Metal powder did not hamper reactor scram under the prevailing circumstances because the drive units are prone to jamming only after a control rod is almost fully inserted and because the forces which insert a control rod by various means (electrical, hydraulic) are 6-8 fold compared with the withdrawing force

  10. Configuration control during plant outages. A review of operating experience

    Energy Technology Data Exchange (ETDEWEB)

    Peinador Veira, Miguel; El Kanbi, Semir [European Commission Joint Research Centre, Petten (Netherlands). Inst. for Energy and Transport; Stephan, Jean-Luc [Institut de Radioprotection et de Surete Nucleaire (IRSN), Fontenay-aux-Roses (France); Martens, Johannes [Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) gGmbH, Koeln (Germany)

    2015-03-15

    After the occurrence of several significant events in nuclear power plants during shut-down modes of operation in the eighties, and from the results of probabilistic safety assessments completed in the nineties, it was clear that risk from low power and shutdown operational modes could not be neglected and had to be addressed by appropriate safety programs. A comprehensive review of operating experience from the last ten years has been conducted by the Joint Research Centre with the objective of deriving lessons learned and recommendations useful for nuclear regulatory bodies and utilities alike. This paper is focused on one particular challenge that any nuclear plant faces whenever it plans its next outage period: how to manage the configuration of all systems under a complex environment involving numerous concurrent activities, and how to make sure that systems are returned to their valid configuration before the plant resumes power operation. This study highlights the importance of conveying accurate but synthesized information on the status of the plant to the operators in the main control room. Many of the lessons learned are related to the alarm display in the control room and to the use of check lists to control the status of systems. Members of the industry and safety authorities may now use these recommendations and lessons learned to feed their own operating experience feedback programs, and check their applicability for specific sites.

  11. Flooding PSA with Plant Specific Operating Experiences of Korean PWRs

    International Nuclear Information System (INIS)

    Choi, Sun Yeong; Yang, Joon Yull

    2006-01-01

    The purpose of this paper is to update the flooding PSA with Korean plant specific operating experience data and the appropriate estimation method for the flooding frequency to improve the PSA quality. The existing flooding PSA used the NPE (Nuclear Power Experience) database up to 1985 for the flooding frequency. They are all USA plant operating experiences. So an upgraded flooding frequency with Korean specific plant operation experience is required. We also propose a method of only using the PWR (Pressurized Water Reactor) data for the flooding frequency estimation in the case of the flooding area in the primary building even though the existing flooding PSA used both PWR and BWR (Boiled Water Reactor) data for all kinds of plant areas. We evaluate the CDF (Core Damage Frequency) with the modified flooding frequency and compare the results with that of the existing flooding PSA method

  12. Power plant operation and management in a deregulated market

    Energy Technology Data Exchange (ETDEWEB)

    Carraretto, Cristian [Department of Mechanical Engineering, University of Padova, Via Venezia, 1-35131 Padova (Italy)

    2006-05-15

    This paper analyzes the influence of electricity deregulation on the design, operation and management of the power plants owned by strategic and non-strategic producers. After a sensitivity analysis aimed at finding market conditions of profitable operation for thermal and hydroelectric power plants, a Nash-equilibrium market model is used to determine producers' optimum strategies, depending on their relative market power and overall production characteristics. Attention is then focused on the operation of single thermal power plants. Their short-term management plans and consequent effects on emission levels and residual life are described. The available reserve for primary and secondary control deriving from producers' market strategies is discussed. Some design options to improve combined cycles contribution to reserve service are finally described. The paper discusses these problems with a general approach, and uses many cases and examples derived from the current Italian scenario. (author)

  13. Power plant operation and management in a deregulated market

    International Nuclear Information System (INIS)

    Carraretto, Cristian

    2006-01-01

    This paper analyzes the influence of electricity deregulation on the design, operation and management of the power plants owned by strategic and non-strategic producers. After a sensitivity analysis aimed at finding market conditions of profitable operation for thermal and hydroelectric power plants, a Nash-equilibrium market model is used to determine producers' optimum strategies, depending on their relative market power and overall production characteristics. Attention is then focused on the operation of single thermal power plants. Their short-term management plans and consequent effects on emission levels and residual life are described. The available reserve for primary and secondary control deriving from producers' market strategies is discussed. Some design options to improve combined cycles contribution to reserve service are finally described. The paper discusses these problems with a general approach, and uses many cases and examples derived from the current Italian scenario. (author)

  14. APC implementation in Chandra Asri - ethylene plant

    Science.gov (United States)

    Sidiq, Mochamad; Mustofa, Ali

    2017-05-01

    Nowadays, the modern process plants are continuously improved for maximizing production, Optimization of the energy and raw material and reducing the risk. Due to many disturbances appearance between the process units, hence, the failure of one unit might have a bad effect on the overall productivity. Ethylene Plant have significant opportunities for using Advanced Process Control (APC) technologies to improve operation stability, push closer to quality or equipment limit, and improve the capability of process units to handle disturbances. APC implementation had considered a best answer for solving multivariable control problem. PT. Chandra Asri Petrochemical, Tbk (CAP) operates a large naphtha cracker complex at Cilegon, Indonesia. To optimize the plant operation and to enhance the benefit, Chandra Asri has been decided to implement Advance Process Control (APC) for ethylene plant. The APC implementation technology scopes at CAP are as follows: 1. Hot Section : Furnaces, Quench Tower 2. Cold Section : Demethanizer, Deethanizer, Acetylene Converter, Ethylene Fractionator, Depropanizer, Propylene Fractionator, Debutanizer

  15. Integration of plant life management in operation and maintenance

    International Nuclear Information System (INIS)

    Hutin, Jean-Pierre

    2002-01-01

    Full text: 1 - INTRODUCTION. Electricite de France is now operating 58 PWR nuclear power plants which produce 75% of french electricity. Besides maintaining safety and availability on a routine basis, it is outmost important to protect the investment. Indeed, such an asset is a tremendous advantage just as the company is going to face the new european electricity market. That is the reason why EDF is devoting important effort to implement ageing management as an integral part of operation and maintenance programs. But it must be recognized that NPP lifetime is not threatened only by component-related problems: other less technical issues must be seriously considered like industrial support, information system, skilled people, public acceptance, etc. 2 - LIFE MANAGEMENT POLICY. In France, there is no limited licensing period for NPPs. The life management policy of nuclear power plants is based on three principles: - safe and cost-effective operation, looking for excellence in daily activities, with an effective experience feedback organisation taking advantage of the high level of standardization of the units, - every ten years, a new set of safety standards, a complete review of each facility and an upgrading of its safety level through appropriate modifications while maintaining unit standardization in all the fleet, - a Life Management Program, at corporate level, which permanently scrutinizes operation and maintenance activities to identify decisions which could impair plant lifetime and which surveys research and development programs related to ageing phenomenon understanding. 3 - INTEGRATION OF LIFETIME CONCERN IN O and M ACTIVITIES. It is outmost important to take in account lifetime concern in daily operation and maintenance activities and this must be done as early as possible in plant life. Even though sophisticated assessments require engineering capacity, many good ideas may arise from plant staff. For that reason, increasing lifetime awareness of plant

  16. Annual radiological environmental operating report: Browns Ferry Nuclear Plant, 1992

    International Nuclear Information System (INIS)

    1993-04-01

    This report describes the environmental radiological monitoring program conducted by TVA in the vicinity of Browns Ferry Nuclear Plant (BFN) in 1992. The program includes the collection of samples from the environment and the determination of the concentrations of radioactive materials in the samples. Samples are taken from stations in the general area of the plant and from areas not influenced by plant operations. Station locations are selected after careful consideration of the weather patterns and projected radiation doses to the various areas around the plant. Material sampled includes air, water, milk, foods, vegetation, soil, fish, sediment, and direct radiation levels. Results from stations near the plant are compared with concentrations from control stations and with preoperational measurements to determine potential impacts of plant operations. Small amounts of Co-60 and Cs-134 were found in sediment samples downstream from the plant. This activity in stream sediment would result in no measurable increase over background in the dose to the general public

  17. Feasibility of the operation CFE`s conventional power plants for industrial cogeneration; Factibilidad de operar las centrales termoelectricas convencionales de la CFE para cogeneracion industrial

    Energy Technology Data Exchange (ETDEWEB)

    Buendia Dominguez, Eduardo H.; Acosta Torres, Rosa Aracely [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1997-12-31

    An analysis is made on how cogeneration could help to maximize the power plant performance since thanks to cogeneration this type of power plants could utilize a part of the waste energy to be supplied to other processes. Also mention is made of the utilization of computer programs to help the design and the realization of functioning tests of this type of power plants. An economic evaluation is presented on the feasibility of operating this type of power plants as cogeneration units and it is concluded that the operation of fossil power plants in the cogeneration mode is not affected by the site where the power plant is located [Espanol] Se analiza como la cogeneracion podria ayudar a maximizar el rendimiento de las centrales termoelectricas ya que gracias a la cogeneracion este tipo de centrales podrian utilizar una parte de la energia desechada para suministrarla a otros procesos. Tambien se menciona la utilizacion de programas de computo para auxiliar en el diseno o realizacion de pruebas de funcionamiento sobre este tipo de plantas. Se presenta una evaluacion economica sobre la factibilidad de operar este tipo de plantas como unidades de cogeneracion y se concluye en que la operacion de centrales termoelectricas en modo de cogeneracion no se ve afectado por el sitio donde se encuentra la central

  18. Feasibility of the operation CFE`s conventional power plants for industrial cogeneration; Factibilidad de operar las centrales termoelectricas convencionales de la CFE para cogeneracion industrial

    Energy Technology Data Exchange (ETDEWEB)

    Buendia Dominguez, Eduardo H; Acosta Torres, Rosa Aracely [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1998-12-31

    An analysis is made on how cogeneration could help to maximize the power plant performance since thanks to cogeneration this type of power plants could utilize a part of the waste energy to be supplied to other processes. Also mention is made of the utilization of computer programs to help the design and the realization of functioning tests of this type of power plants. An economic evaluation is presented on the feasibility of operating this type of power plants as cogeneration units and it is concluded that the operation of fossil power plants in the cogeneration mode is not affected by the site where the power plant is located [Espanol] Se analiza como la cogeneracion podria ayudar a maximizar el rendimiento de las centrales termoelectricas ya que gracias a la cogeneracion este tipo de centrales podrian utilizar una parte de la energia desechada para suministrarla a otros procesos. Tambien se menciona la utilizacion de programas de computo para auxiliar en el diseno o realizacion de pruebas de funcionamiento sobre este tipo de plantas. Se presenta una evaluacion economica sobre la factibilidad de operar este tipo de plantas como unidades de cogeneracion y se concluye en que la operacion de centrales termoelectricas en modo de cogeneracion no se ve afectado por el sitio donde se encuentra la central

  19. Environmental efficiency among corn ethanol plants

    International Nuclear Information System (INIS)

    Sesmero, Juan P.; Perrin, Richard K.; Fulginiti, Lilyan E.

    2012-01-01

    Economic viability of the US corn ethanol industry depends on prices, technical and economic efficiency of plants and the extent of policy support. Public policy support is tied to the environmental efficiency of plants measured as their impact on emissions of greenhouse gases. This study evaluates the environmental efficiency of seven recently constructed ethanol plants in the North Central region of the US, using nonparametric data envelopment analysis (DEA). The minimum feasible level of GHG emissions per unit of ethanol is calculated for each plant and this level is decomposed into its technical and allocative sources. Results show that, on average, plants in our sample may be able to reduce GHG emissions by a maximum of 6% or by 2.94 Gg per quarter. Input and output allocations that maximize returns over operating costs (ROOC) are also found based on observed prices. The environmentally efficient allocation, the ROOC-maximizing allocation, and the observed allocation for each plant are combined to calculate economic (shadow) cost of reducing greenhouse gas emissions. These shadow costs gauge the extent to which there is a trade off or a complementarity between environmental and economic targets. Results reveal that, at current activity levels, plants may have room for simultaneous improvement of environmental efficiency and economic profitability. -- Highlights: ► Environmental efficiency of ethanol plants in the North Central US is evaluated. ► Economic (shadow) cost of reducing greenhouse gas emissions is calculated. ► Feasible changes in the mix of inputs and byproducts can reduce GHG emissions. ► On average plants may be able to reduce GHG emissions by 2.94 Gg per quarter. ► GHG reductions may be achieved at a moderate or zero operating cost.

  20. Plant-life extension planning for an operating LMFBR

    International Nuclear Information System (INIS)

    King, R.W.

    1985-01-01

    The study concluded that continued EBR-II operation is certainly feasible for well beyond 10 more years, and that continued demonstration of the unique inherent safety and operability features of a pool-type liquid-metal-cooled reactor and the demonstration of a reasonable operating lifetime are very important and will provide invaluable information for the design and development of the next generation nuclear power plants

  1. Operational experience, availability and reliability of nuclear power plants

    International Nuclear Information System (INIS)

    Kueffer, K.

    1980-01-01

    This lecture - presents a survey on nuclear power production and plant performance in the Western World covering all reactor types and light-water reactors in particular and discusses key parameters such as load factors and non-availability analysis. - outlines the main reasons for the reliable performance of Swiss nuclear power plants - quality equipment - operator qualification and training - engineering know how on site - maintenance philosophy and outage planning - information system and feedback of experience - explains the management functions as applied at the Beznau Nuclear Power Station to ensure high power productivity and reliability - improvement - a feedback control system - analysis of production losses - optimization in shut-down planning - minimizing disturbances during plant operation - optimizing personnel qualification and efficiency. (orig.)

  2. Research on psychological evaluation method for nuclear power plant operators

    International Nuclear Information System (INIS)

    Fang Xiang; He Xuhong; Zhao Bingquan

    2007-01-01

    The qualitative and quantitative psychology evaluation methods to the nuclear power plant operators were analyzed and discussed in the paper. The comparison analysis to the scope and result of application was carried out between method of outline figure fitted and method of fuzzy synthetic evaluation. The research results can be referenced to the evaluation of nuclear power plant operators. (authors)

  3. IAEA Operational Safety Team Reviews Cattenom Nuclear Power Plant

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of nuclear installation safety experts led by the International Atomic Energy Agency (IAEA) has reviewed operational safety at France's Cattenom Nuclear Power Plant (NPP) noting a series of good practices as well as recommendations and suggestions to reinforce them. The IAEA assembled an international team of experts at the request of the Government of France to conduct an Operational Safety Review (OSART) of Cattenom NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety in Vienna, the OSART team performed an in-depth operational safety review of the plant from 14 November to 1 December 2011. The team was made up of experts from Belgium, the Czech Republic, Finland, Germany, Hungary, Japan, Russia, Slovakia, South Africa, Sweden, Ukraine, the United Kingdom and the IAEA. The team at Cattenom conducted an in-depth review of the aspects essential to the safe operation of the NPP, which is largely under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards. The review covered the areas of Management, Organization and Administration; Training and Qualification; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry; Emergency Planning and Preparedness; and Severe Accident Management. Cattenom is the first plant in Europe to voluntarily undertake a Severe Accident Management review during an OSART review. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: Sheets are displayed in storage areas where combustible material is present - these sheets are updated readily and accurately by the area owner to ensure that the fire limits are complied with; A simple container is attached to the neutron source handling device to ensure ease and safety of operations and reduce possible radiation exposure during use

  4. Safety aspects and operating experience of LWR plants in Japan

    International Nuclear Information System (INIS)

    Aoki, S.; Yoshioka, T.; Toyota, M.; Hinoki, M.

    1977-01-01

    To develop nuclear power generation for the future, it is necessary to put further emphasis on safety assurance and to endeavour to devise measures to improve plant availability, based on the careful analysis of causes that reduce plant availability. The paper discusses the results of studies on the following items from such viewpoints: (1) Safety and operating experience of LWR nuclear power plants in Japan: operating experience with LWRs; improvements in LWR design during the past ten years; analysis of the factors affecting plant availability; (2) Assurance of safety and measures to increase availability: measures for safety and environmental protection; measures to reduce radiation exposure of employees; appropriateness of maintenance and inspection work; measures to increase plant availability; measures to improve reliability of equipment and components; (3) Future technical problems. (author)

  5. Safety aspects and operating experience of LWR plants in Japan

    International Nuclear Information System (INIS)

    Aoki, S.; Hinoki, M.

    1977-01-01

    From the outset of nuclear power development in Japan, major emphasis has been placed on the safety of the nuclear power plants. There are now twelve nuclear power plants in operation with a total output of 6600 MWe. Their operating records were generally satisfactory, but in the 1974 to 1975 period, they experienced somewhat declined availability due to the repair work under the specific circumstances. After investigation of causes of troubles and the countermeasures thereof were made to ensure safety, they are now keeping good performance. In Japan, nuclear power plants are strictly subject to sufficient and careful inspection in compliance with the safety regulation, and are placed under stringent radiation control of employees. Under the various circumstances, however, the period of annual inspection tends to be prolonged more than originally planned, and this consequently is considered to be one of the causes of reduced availability. In order to develop nuclear power generation for the future, it is necessary to put further emphasis on the assurance of safety and to endeavor to devise measures to improve availability of the plants, based on the careful analysis of causes which reduce plant availability. This paper discusses the results of studies made for the following items from such viewpoints: (1) Safety and Operating Experience of LWR Nuclear Power Plants in Japan; a) Operating experience with light water reactors b) Improvements in design of light water reactors during the past ten years c) Analysis of the factors which affect plant availability; 2) Assurance of Safety and Measures to Increase Availability a) Measures for safety and environmental protection b) Measures to reduce radiation exposure of employees c) Appropriateness of maintenance and inspection work d) Measures to increase plant availability e) Measures to improve reliability of equipments and components; and 3) Future Technical Problems

  6. Safe Operation of Nuclear Power Plants. Code of Practice and Technical Appendices

    International Nuclear Information System (INIS)

    1969-01-01

    This book is in two parts. The first is a Code of Practice for the Safe Operation of Nuclear Power Plants and the second part is a compilation of technical appendices. Its object is to give information and illustrative examples that would be helpful in implementing the Code of Practice. This second part, although published under the same cover, is not part of the Code. Safe operation of a nuclear power plant postulates suitable siting and proper design, construction and management of the plant. Under the present Code of Practice for the Safe Operation of Nuclear Power Plants, those intending to operate the plant are recommended to prepare documentation which would deal with its operation and include safety analyses. The documentation in question would be reviewed by a regulatory body independent of the operating organization; operation would be authorized on the understanding that it would comply with limits and conditions designed to ensure safety. The Code may be subject to revision in the light of experience. The Appendices provide additional information together with some examples relating to certain topics dealt with in the Code; it must be emphasized that they are included as examples for information only and are not part of any recommendation. Purpose and scope: The recommendations in the Code are designed to protect the general public and the operating personnel from radiation hazards, and the Code forms part of the Agency's Safety Standards. The Code, which should be used in conjunction with the Agency's other Safety Standards, provides guidance and information to persons and authorities responsible for the operation of stationary nuclear power plants whose main function is the generation of thermal, mechanical or electrical power; it is not intended to apply to reactors used solely for experimental or research purposes. It sets forth minimum requirements which, it is believed, in the light of experience, must be met in order to achieve safe operation of a

  7. Design of an operator support system for online maintenance at nuclear power plant

    International Nuclear Information System (INIS)

    Chu Yongyue; Li Huwei; Gao Qiang; Yi Yan; Yang Ming

    2013-01-01

    Online maintenance based on reliability centered management is pivotal for the safe and economical operation of Nuclear Power Plant (NPP). This paper presents an operator support system through which the operators can effectively manage plant configuration and identify the weaknesses in plant operation. The proposed operator support system is based on the GO-FLOW, which is a success-oriented availability analysis methodology and can be used for evaluating phased missions. In this paper, the design of the proposed operator support system is introduced through a case study of the Auxiliary Feed Water System (AFWS). (author)

  8. Operational experience of human-friendly control and instrumentation systems for BWR nuclear power plants

    International Nuclear Information System (INIS)

    Makino, M.; Watanabe, T.; Suto, O.; Asahi, R.

    1987-01-01

    In recent BWR nuclear power plants in Japan, an advanced centralized monitoring and control system PODIA (Plant Operation by Displayed Information and Automation), which incorporates many operator aid functions, has been in operation since 1985. Main functions of the PODIA system as a computerized operator aid system are as follows. CRT displays for plant monitoring. Automatic controls and operation guides for plant operation. Stand-by status monitoring for engineered safety features during normal operation. Surveillance test procedure guides for engineered safety features. Integrated alarm display. The effectiveness of these functions have been proved through test and commercial operation. It has been obtained that operators have preferred PODIA much more than conventional monitoring and control systems

  9. Optimal Bidding and Operation of a Power Plant with Solvent-Based Carbon Capture under a CO2 Allowance Market: A Solution with a Reinforcement Learning-Based Sarsa Temporal-Difference Algorithm

    Directory of Open Access Journals (Sweden)

    Ziang Li

    2017-04-01

    Full Text Available In this paper, a reinforcement learning (RL-based Sarsa temporal-difference (TD algorithm is applied to search for a unified bidding and operation strategy for a coal-fired power plant with monoethanolamine (MEA-based post-combustion carbon capture under different carbon dioxide (CO2 allowance market conditions. The objective of the decision maker for the power plant is to maximize the discounted cumulative profit during the power plant lifetime. Two constraints are considered for the objective formulation. Firstly, the tradeoff between the energy-intensive carbon capture and the electricity generation should be made under presumed fixed fuel consumption. Secondly, the CO2 allowances purchased from the CO2 allowance market should be approximately equal to the quantity of CO2 emission from power generation. Three case studies are demonstrated thereafter. In the first case, we show the convergence of the Sarsa TD algorithm and find a deterministic optimal bidding and operation strategy. In the second case, compared with the independently designed operation and bidding strategies discussed in most of the relevant literature, the Sarsa TD-based unified bidding and operation strategy with time-varying flexible market-oriented CO2 capture levels is demonstrated to help the power plant decision maker gain a higher discounted cumulative profit. In the third case, a competitor operating another power plant identical to the preceding plant is considered under the same CO2 allowance market. The competitor also has carbon capture facilities but applies a different strategy to earn profits. The discounted cumulative profits of the two power plants are then compared, thus exhibiting the competitiveness of the power plant that is using the unified bidding and operation strategy explored by the Sarsa TD algorithm.

  10. HMI design of MIRROR PLANT for Safe Operation and Application to Vinyl Acetate Monomer Process

    International Nuclear Information System (INIS)

    Hatsugai, Emiko; Nakaya, Makoto

    2014-01-01

    Dynamic plant simulators have always been used off-line for operator training and control loop design prior to the plant construction phase. Here, we propose on-line use of a dynamic simulator for the development of new plant operation. The developed MIRROR PLANT is an on-line dynamic plant simulator that can perfectly simulate dynamic plant behavior, and can also be used to forecast future plant behavior by making the computer run the simulation faster than real-time. Using the estimated and forecast data, the plant operator can detect abnormal situations in the plant. Before activating an alarm from the conventional control system, the operator will be able to perform proactive operation to maintain safety. In this paper, we propose a new human-machine interface (HMI) design to realize proactive operation and discuss application of the HMI to the vinyl acetate monomer process as an example of MIRROR PLANT

  11. Method of operating a nuclear turbine plant

    Energy Technology Data Exchange (ETDEWEB)

    Ikeda, Hiraku; Ootawara, Yasuhiko; Imai, Tetsu

    1985-04-25

    A method is presented to prevent the lowering in the reactor feedwater temperature thereby secure necessary amount of steams even in a plant operation under low load. The feedwater temperature of a nuclear reactor is detected at the low load region of the plant and high enthalpy steams are supplied to a high pressure feedwater heater by opening a supply stream extract switching valve. This enables to maintain the feedwater temperature in the nuclear reactor at a constant level.

  12. Analyses of operating license renewal for nuclear power plants in USA

    International Nuclear Information System (INIS)

    Chiba, Goro

    2007-01-01

    Although the originally-approved operating period for nuclear power plants in the U.S. is 40 years, the operating periods of many plants have been extended by license renewal for another 20 years. On the other hand, in Japan, plant life management is carried out assuming long-term operation of the plant, and the electric power company submits reports, such as aging technology assessment, and receives evaluation by the authorities. In this paper, the situation regarding plant life management was investigated and a Japan-U.S. comparison was made. As a result, differences were found in the procedure, the background, the manpower, the review period, etc. in Japan and the U.S. but there is no difference between Japan and the U.S. in aiming for a check of the integrity of components, assuming long-term operation for 60 years. Moreover, trend analysis using the overseas fault database of INSS examined the effect on the preservation activities of a license renewal. As a result, there is a tendency for license renewal not to be applied for in units in which the number of aging faults increases with the increase in elapsed years. The U.S. license renewal system was considered to be effective in plant life management, and suggested the validity of plant life management in Japan which is employing the equivalent system to the U.S. (author)

  13. Operation of Finnish nuclear power plants. Quarterly report, 2nd quarter 1997

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1997-12-01

    Quarterly Reports on the operation of Finnish nuclear power plants describe events and observations relating to nuclear and radiation safety which STUK - Radiation and Nuclear Safety Authority considers safety significant. Safety improvements at the plants are also described. The Report also includes a summary of the radiation safety of plant personnel and of the environment and tabulated data on the plants' production and load factors. The Finnish nuclear power plant units were in power operation in the second quarter of 1997, except for the annual maintenance outages of Olkiluoto plant units and the Midsummer outage at Olkiluoto 2 due to reduced demand for electricity. There were also brief interruptions in power operation at the Olkiluoto plant units due to three reactor scrams. All plant units are undergoing long-term test operation at upgraded reactor power level which has been approved by STUK The load factor average of all plant units was 88.7 %. One event in the second quarter of 1997 was classified level 1 on the INES. The event in question was a scram at Olkiluoto 1 which was caused by erroneous opening of switches. Other events in this quarter were level 0. Occupational doses and radioactive releases off-site were below authorized limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. (orig.)

  14. Analysis of human factor in operation of nuclear power plants

    International Nuclear Information System (INIS)

    Husseiny, A.A.; Sabri, Z.A.

    1980-01-01

    A taxonomy of operator errors is developed here to provide a scheme for compiling data from field experience according to their significance to the operation and their influence on the plant performance. The reversibility of operator actions is taken as the basis of detection of the relevances of errors to the overall operation. In addition, distinction is made between system errors, such as inadequate instrumentation or logistics, and 'operator errors', which indicate that the operator is involved in inducing an operational error rather than being uniquely responsible for an incident. The developed taxonomy can be used for evaluation of the performance of operators during scheduled training programs. Identification of each class of errors would assist in upgrading performance of operators in a given plant and in filing occurrence reports that help in revising safety provisions or operation procedures. The scheme is suitable for sorting and storing failure information in a data library for ease of retrieval by reliability analysis codes. (orig.) [de

  15. Maintaining the safe operation of U.S. nuclear power plants

    International Nuclear Information System (INIS)

    Skavdahl, R.E.

    1991-01-01

    The more than one hundred nuclear power plants in the U.S. are a vital resource that provides about 20% of the electrical power production. Although about half the plants are more than 15 years old, there is no evidence of age-related deterioration in any of the key indicators of industry performance; indeed, the continuing improvement in all these indicators shows the industry is maturing, not growing old. The Institute for Nuclear Power Operations's performance assessment and training programs have spurred a heavy industry-wide commitment to improved training. These efforts are the key to excellence in the performance of operations and maintenance personnel. The interface between the reactor and the operator has been improved through control room design reviews, the implementation of a Safety Parameter Display System, and emergency procedure guidelines. These improvements ensure that the operators will be able to perform their functions under any circumstances they may encounter. Led by NUMARC, the industry initiative to improve plant maintenance programs incorporates such elements as the INPO performance standards, enhanced monitoring through the use of the Nuclear Plant Reliability Data System, Reliability Centered Maintenance, and improvements in plant technical specifications. These elements bring the latest available technology to plant maintenance programs. Equipment replacements are frequently made to take advantage of improvements in technology. Aside from the performance enhancements they offer, such replacements also serve to keep the plants young. By leveraging their resources through the owners groups, utilities are able to quickly and efficiently solve problems together that they could not afford to attack individually. Even the highly unlikely hypothetical severe accidents are addressed in a systematic fashion through the application of Probabilistic Risk Assessments. 15 figs

  16. Hazard and operability study of Heavy Water Plant, Manuguru

    Energy Technology Data Exchange (ETDEWEB)

    Nayak, S K; Khilnaney, V K [Heavy Water Board, Department of Atomic Energy, Mumbai (India)

    1994-06-01

    The chemical process industry faces the tough challenge of achieving design productivity while maintaining high standards of safety. This task is particularly difficult than handling hazardous chemicals. Hazard and operability study (HazOp) is a technique which involves systematic and thorough study by a multidisciplinary team. This technique provides a means to analyse the design and modes of operations of a plant systematically so as to identify the potential occurrence of hazardous events and operational problems. HazOp is based on the premise that a hazard is not realised if the process is operated within its design intent. This paper gives an overall view of the HazOp study carried out at Heavy Water Plant, Manuguru. Some selected recommendations from this study are highlighted. (author). 2 refs., 5 figs.

  17. Role of cognitive models of operators in the design, operation and licensing of nuclear power plants

    International Nuclear Information System (INIS)

    Rasmussen, J.

    1982-01-01

    Cognitive models of the behavior of nuclear power plant operators - that is, models developed in terms of human properties rather than external task characteristics - are assuming increasingly important roles in plant design, operation and licensing. This is partly due to an increased concern for human decision making during unfamiliar plant conditions, and partly due to problems that arise when modern information technology is used to support operators in complex situations. Some of the problems identified during work on interface design and risk analysis are described. First, the question of categories of models is raised. Next, the use of cognitive models for system design is discussed. The use of the available cognitive models for more effective operator training is also advocated. The need for using cognitive models in risk analysis is also emphasized. Finally, the sources of human performance data, that is, event reports, incident analysis, experiments, and training simulators are mentioned, and the need for a consistent framework for data analysis based on cognitive models is discussed

  18. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1994-06-01

    Quarterly reports on the operation of the Finnish NPPs describe nuclear and radiation safety related events and observations which the Finnish Centre for Radiation and Nuclear Safety considers significant. Safety improvements at the plants and general matters relating to the use of nuclear energy are also reported. A summary of the radiation safety of plant personnel and the environment, and tabulated data on the plants' production and load factors are also given. One event during the last quarter of 1993 was rated on the International Nuclear Event Scale (INES) as level 1. During this event at Loviisa 2, the secondary circuit emergency feedwater system was erroneously isolated from automatic start-up readiness. The error went unnoticed for 4.5 hours. During 1993 one level 2 incident and three level 1 incidents occurred at the Finnish NPPs. (8 figs., 4 tabs.)

  19. Monitoring and operational support on nuclear power plants using an artificial intelligence system

    International Nuclear Information System (INIS)

    Bianchi, P.H.; Baptista Filho, B.D.

    2009-01-01

    The monitoring task in nuclear power plants is of crucial importance with respect to safety and efficient operation. The operators have a wide range of variables to observe and analyze; the quantity of variables and their behavior determine the time they have to take correct decisions. The complexity of such aspects in a nuclear power plant influences both, the plant operational efficiency and the general safety issues. This paper describes an experimental system developed by the authors which aims to assist the operators of nuclear power plants to take quick and safe decisions. The system maps the status of plant and helps the operators to make quick judgments by using artificial intelligence methods. The method makes use of a small set of monitored variables and presents a map of the plant status in a friendly manner. This system uses an architecture that has multiple self-organizing maps to perform these tasks. (author)

  20. Monitoring and operational support on nuclear power plants using an artificial intelligence system

    Energy Technology Data Exchange (ETDEWEB)

    Bianchi, Paulo H.; Baptista Filho, Benedito D., E-mail: phbianchi@gmail.co, E-mail: bdbfilho@ipen.b [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2009-07-01

    The monitoring task in nuclear power plants is of crucial importance with respect to safety and efficient operation. The operators have a wide range of variables to observe and analyze; the quantity of variables and their behavior determine the time they have to take correct decisions. The complexity of such aspects in a nuclear power plant influences both, the plant operational efficiency and the general safety issues. This paper describes an experimental system developed by the authors which aims to assist the operators of nuclear power plants to take quick and safe decisions. The system maps the status of plant and helps the operators to make quick judgments by using artificial intelligence methods. The method makes use of a small set of monitored variables and presents a map of the plant status in a friendly manner. This system uses an architecture that has multiple self-organizing maps to perform these tasks. (author)

  1. Predictors of operator performance at a simulated nuclear power plant control task

    International Nuclear Information System (INIS)

    Spettell, C.M.

    1986-01-01

    Male undergraduates participated in two experiments as operators of a simple dynamic nuclear power plant simulated on a personal computer. Their task involved monitoring the temperature and power output of the plant and controlling the flow of coolants and the position of the control rods to ensure that the plant operated at the desired temperature and output levels. Quality of performance was defined as the operator's ability to minimize the deviations in temperature and output from optimal values during the trials. Operator inputs and the status of all plant variables were recorded on-line every two seconds. Based on a review of human factors engineering and psychological literature, a number of personality, background, and process variables were measured and correlated with operator performance. Results of both experiments indicated that the strongest predictors of operator performance were the rate, magnitude, and accuracy of operator inputs. Input rate and magnitude were negatively related to overall performance; input accuracy was positively related to performance. These process variables and overall performance were relatively stable across trials of varying difficulty

  2. Maximally-localized position, Euclidean path-integral, and thermodynamics in GUP quantum mechanics

    Science.gov (United States)

    Bernardo, Reginald Christian S.; Esguerra, Jose Perico H.

    2018-04-01

    In dealing with quantum mechanics at very high energies, it is essential to adapt to a quasiposition representation using the maximally-localized states because of the generalized uncertainty principle. In this paper, we look at maximally-localized states as eigenstates of the operator ξ = X + iβP that we refer to as the maximally-localized position. We calculate the overlap between maximally-localized states and show that the identity operator can be expressed in terms of the maximally-localized states. Furthermore, we show that the maximally-localized position is diagonal in momentum-space and that the maximally-localized position and its adjoint satisfy commutation and anti-commutation relations reminiscent of the harmonic oscillator commutation and anti-commutation relations. As application, we use the maximally-localized position in developing the Euclidean path-integral and introduce the compact form of the propagator for maximal localization. The free particle momentum-space propagator and the propagator for maximal localization are analytically evaluated up to quadratic-order in β. Finally, we obtain a path-integral expression for the partition function of a thermodynamic system using the maximally-localized states. The partition function of a gas of noninteracting particles is evaluated. At temperatures exceeding the Planck energy, we obtain the gas' maximum internal energy N / 2 β and recover the zero heat capacity of an ideal gas.

  3. Modernization of turbines in nuclear power plants

    International Nuclear Information System (INIS)

    Harig, T.

    2005-01-01

    An ongoing goal in the power generation industry is to maximize the output of currently installed assets. This is most important at nuclear power plants due to the large capital investments that went into these plants and their base loaded service demands. Recent trends in the United States show a majority of nuclear plants are either obtaining, or are in the process of obtaining NRC approvals for operating license extensions and power uprates. This trend is evident in other countries as well. For example, all Swedish nuclear power plants are currently working on projects to extend their service life and maximize capacity through thermal uprate and turbine-generator upgrade with newest technology. The replacement of key components with improved ones is a means of optimizing the service life and availability of power plants. Economic advantages result from increased efficiency, higher output, shorter startup and shutdown times as well as reduced outage times and service costs. The rapid advances over recent years in the development of calculation programs enables adaptation of the latest blading technology to the special requirements imposed by steam turbine upgrading. This results in significant potential for generating additional output with the implementation of new technology, even without increased thermal power. In contrast to maintenance and investment in pure replacement or repair of a component with the primary goal of maintaining operability and reliability, the additional output gained by upgrading enables a return on investment to be reaped. (orig.)

  4. Instantons and Gribov copies in the maximally Abelian gauge

    International Nuclear Information System (INIS)

    Bruckmann, F.; Heinzl, T.; Wipf, A.; Tok, T.

    2000-01-01

    We calculate the Faddeev-Popov operator corresponding to the maximally Abelian gauge for gauge group SU(N). Specializing to SU(2) we look for explicit zero modes of this operator. Within an illuminating toy model (Yang-Mills mechanics) the problem can be completely solved and understood. In the field theory case we are able to find an analytic expression for a normalizable zero mode in the background of a single 't Hooft instanton. Accordingly, such an instanton corresponds to a horizon configuration in the maximally Abelian gauge. Possible physical implications are discussed

  5. Independent verification in operations at nuclear power plants

    International Nuclear Information System (INIS)

    Donderi, D.C.; Smiley, A.; Ostry, D.J.; Moray, N.P.

    1995-09-01

    A critical review of approaches to independent verification in operations used in nuclear power plant quality assurance programs in other countries, was conducted for this study. This report identifies the uses of independent verification and provides an assessment of the effectiveness of the various approaches. The findings indicate that at Canadian nuclear power plants as much, if not more, independent verification is performed than at power plants in the other countries included in the study. Additional requirements in this area are not proposed for Canadian stations. (author)

  6. Increasing flexibility of coal power plant by control system modifications

    Directory of Open Access Journals (Sweden)

    Marušić Ante

    2016-01-01

    Full Text Available Expanding implementation of intermittent renewable energy sources has already started to change the role of thermal power plants in energy systems across Europe. Traditionally base load plants are now forced to operate as peaking plants. A familiar transition in upcoming years is expected in Croatia and coal power plant operators are preparing accordingly. To evaluate cycling capabilities and control system operation for flexible operation of selected 210 MW coal plant, series of tests with different load gradients were performed and results were thoroughly analyzed. Two possible “bottlenecks” are identified, thermal stress in superheater header, and achievable ramping rate considering operational limitations of coal feeders, firing system and evaporator dynamics. Several unexpected readings were observed, usually caused by malfunctioning sensors and equipment, resulting in unexpected oscillations of superheated steam temperature. Based on superheater geometry and experimental data, maximal steam temperature gradient during ramping was evaluated. Since thermal stress was well inside the safety margins, the simulation model of the whole boiler was used to evaluate achievable ramping on electric side.

  7. One year of operation of the Belgonucleaire (Dessel) plutonium fuel fabrication plant

    International Nuclear Information System (INIS)

    Leblanc, J.M.

    1975-01-01

    Based on experience with plutonium since 1958, Belgonucleaire has successively launched a pilot plant and then a fuel fabrication plant for mixed uranium and plutonium oxides in 1968 and 1973 respectively. After describing briefly the plants and the most important stages in the planning, construction and operation of the Dessel plant, the present document describes the principal problems which were met during the course of operation of the plant and their direct incidence on the capacity and quality of the production of fuel elements

  8. Simulation analysis of emissions trading impact on a non-utility power plant

    International Nuclear Information System (INIS)

    Imran, Kashif; Ahmad, Intesar; Hassan, Tehzeebul; Aslam, Muhammad Farooq; Ngan, Hon-Wing

    2009-01-01

    Non-utility power plants can competitively participate in open electricity market to reduce operational costs but in the absence of pollution charges or emissions trading such generators are tempted to cause greater pollution for profit maximization. This paper presents a solution that incorporates pollution charges for nitrogen oxides and sulphur dioxide emissions in line with existing national environmental quality standards and a new carbon dioxide emissions trading mechanism. A novel approach has been used for allocation of allowable emissions that favors efficiently fuelled and environmentally friendly operation for maximizing profit. Impact of proposed carbon trading on economical utilization of enormous indigenous coal reserves has been analyzed and determined to be acceptable. Software developed in this paper, harnessing Sequential Quadratic Programming capabilities of Matlab, is shown to be adequate simulation tool for various emissions trading schemes and an useful operational decision making tool for constrained non-linear optimization problem of a non-utility power plant. (author)

  9. Simulation analysis of emissions trading impact on a non-utility power plant

    Energy Technology Data Exchange (ETDEWEB)

    Imran, Kashif; Ahmad, Intesar [Department of Electrical Engineering, COMSATS Institute of IT, Lahore (Pakistan); Hassan, Tehzeebul [Department of Electrical Engineering, University of Engineering and Technology (UET), Lahore (Pakistan); Aslam, Muhammad Farooq [Department of Electrical Engineering, University of Management and Technology (UMT), Lahore (Pakistan); Ngan, Hon-Wing [Department of Electrical Engineering, Hong Kong Polytechnic University (China)

    2009-12-15

    Non-utility power plants can competitively participate in open electricity market to reduce operational costs but in the absence of pollution charges or emissions trading such generators are tempted to cause greater pollution for profit maximization. This paper presents a solution that incorporates pollution charges for nitrogen oxides and sulphur dioxide emissions in line with existing national environmental quality standards and a new carbon dioxide emissions trading mechanism. A novel approach has been used for allocation of allowable emissions that favors efficiently fuelled and environmentally friendly operation for maximizing profit. Impact of proposed carbon trading on economical utilization of enormous indigenous coal reserves has been analyzed and determined to be acceptable. Software developed in this paper, harnessing Sequential Quadratic Programming capabilities of Matlab, is shown to be adequate simulation tool for various emissions trading schemes and an useful operational decision making tool for constrained non-linear optimization problem of a non-utility power plant. (author)

  10. Primary coolant feed and bleed operating regions for the Midland Plant

    International Nuclear Information System (INIS)

    Tsai, M.S.

    1985-01-01

    Operating regions for primary coolant feed and bleed cooling are developed for the Midland Plant using core decay heat, the high-pressure injection (HPI) system capacity, and flow rate relief through the power-operated relief valve (PORV). This mode of cooling is used for accident scenarios in which the normal core cooling means of a nuclear power plant is lost because of loss of water inventory in the steam generators. The HPI flow is based on the capacities of one and two pumps. Saturated steam, saturated water, and subcooled water are considered to be possible states of the fluid being relieved through the PORV. In estimating the PORV relief rate, flow equations are derived from the Electric Power Research Institute test data obtained from the same model and size valve that is used in the Midland Plant. For easy reference by operators, the operating region is displayed on a plane of reactor coolant system pressure and temperature. The technique developed for the Midland Plant provides a convenient method for examining the feed and bleed cooling capability for a nuclear power plant that employs a pressurized water reactor system

  11. Distributed Low-Complexity Controller for Wind Power Plant in Derated Operation

    DEFF Research Database (Denmark)

    Biegel, Benjamin; Madjidian, Daria; Spudic, Vedrana

    2013-01-01

    We consider a wind power plant of megawatt wind turbines operating in derated mode. When operating in this mode, the wind power plant controller is free to distribute power set-points to the individual turbines, as long as the total power demand is met. In this work, we design a controller...... that exploits this freedom to reduce the fatigue on the turbines in the wind power plant. We show that the controller can be designed in a decentralized manner, such that each wind turbine is equipped with a local low-complexity controller relying only on few measurements and little communication. As a basis...... for the controller design, a linear wind turbine model is constructed and verified in an operational wind power plant of megawatt turbines. Due to limitations of the wind power plant available for tests, it is not possible to implement the developed controller; instead the final distributed controller is evaluated...

  12. Plant Operation Station for HTR-PM Low Power and Shutdown operation Probabilistic safety analysis

    International Nuclear Information System (INIS)

    Liu Tao; Tong Jiejuan

    2014-01-01

    Full range Probabilistic safety analysis (PSA) is one of key conditions for nuclear power plant (NPP) licensing according to the requirement of nuclear safety regulatory authority. High Temperature Gas Cooled Reactor Pebble-bed Module (HTR-PM) has developed construction design and prepared for the charging license application. So after the normal power operation PSA submitted for review, the Low power and Shutdown operation Probabilistic safety analysis (LSPSA) also begin. The results of LSPSA will together with prior normal power PSA results to demonstrate the safety level of HTR-PM NPP Plant Operation Station (POS) is one of important terms in LSPSA. The definition of POS lays the foundation for LSPSA modeling. POS provides initial and boundary conditions for the following event tree and fault tree model development. The aim of this paper is to describe the state-of-the-art of POS definition for HTR-PM LSPSA. As for the first attempt to the high temperature gas cooled reactor module plant, the methodology and procedure of POS definition refers to the LWR LSPSA guidance, and adds to plant initial status analysis due to the HTR-PM characteristics. A specific set of POS grouping vectors is investigate and suggested for HTR-PM NPP, which reflects the characteristics of plant modularization and on-line refueling. As a result, seven POSs are given according to the grouping vectors at the end of the paper. They will be used to the LSPSA modelling and adjusted if necessary. The papers ’work may provide reference to the analogous NPP LSPSA. (author)

  13. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1990-12-01

    During the second quarter of 1990 the Finnish nuclear plant units Loviisa 1 and 2 and TVO and II were in commercial operation for most of the time. The feedwater pipe rupture at Loviisa 1 and the resulting inspections and repairs at both Loviisa plant units brought about an outage the overall duration of which was 32 days. The annual maintenance outages of the TVO plant units were arranged during the report period and their combined duration was 31.5 days. Nuclear electricity accounted for 35.3% of the total Finnish electricity production during this quarter. The load factor average of the nuclear power plant units was 83.0%. Three events occurred during the report period which are classified as Level 1 on the International Nuclear Event Scale: feedwater pipe rupture at Loviisa 1, control rod withdrawal at TVO I in a test during an outage when the hydraulic scram system was rendered inoperable and erroneous fuel bundle transfers during control rod drives maintenance at TVO II. Other events during this quarter are classified as Level Zero (Below Scale) on the International Nuclear Event Scale. Occupational radiation doses and external releases of radioactivity were considerably below authorised limits. Only small amounts of nuclides originating in nuclear power plants were detected in samples taken in the vicinity of nuclear power plants

  14. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1993-12-01

    Quarterly reports on the operation of Finnish nuclear power plants describe events and observations related to nuclear and radiation safety which the Finnish Centre for Radiation and Nuclear Safety considers safety significant. Safety-enhancing plant modifications and general matters relating to the use of nuclear energy are also reported. A summary of the radiation safety of plant personnel and the environment, and tabulated data on the plants' production and their load factors are also given. At the Loviisa 1 plant unit one of two specially-backed AC busbars was lost during the second quarter of 1993. A ca. 30 minute voltage break caused malfunctions in the plant unit's electrical equipment and rendered inoperable certain components important to safety. The event is rated on the International Nuclear Event Scale (INES) at level 1. In inspections carried out at TVO II during the annual maintenance outage, the number of cracks detected in control rod structural material was higher than usual. When cracks occur, part of boron carbide, the power regulating medium in control rods, may wash into the reactor water and control rod shutdown capability may be impaired. The event is rated on the INES at level 1. Other events in the second quarter of 1993 had no bearing on nuclear or radiation safety. (4 figs., 5 tabs.)

  15. Operation and Maintenance Manual for the Central Facilities Area Sewage Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Norm Stanley

    2011-02-01

    This Operation and Maintenance Manual lists operator and management responsibilities, permit standards, general operating procedures, maintenance requirements and monitoring methods for the Sewage Treatment Plant at the Central Facilities Area at the Idaho National Laboratory. The manual is required by the Municipal Wastewater Reuse Permit (LA-000141-03) the sewage treatment plant.

  16. Design basis programs and improvements in plant operation

    International Nuclear Information System (INIS)

    Metcalf, M.F.

    1991-01-01

    Public Service Electric and Gas (PSE and G) Company operates three commercial nuclear power plants in southern New Jersey. The three plants are of different designs and vintages (two pressurized water reactors licensed in 1976 and 1980 and one boiling water reactor licensed in 1986). As the industry recognized the need to develop design basis programs, PSE and G also realized the need after a voluntary 52-day shutdown of one unit because of electrical design basis problems. In its drive to be a premier electric utility, PSE and G has been aggressively active in developing design basis documents (DBDs) with supporting projects and refined uses to obtain the expected value and see the return on investment. Progress on Salem is nearly 75% complete, while Hope Creek is 20% complete. To data, PSE and G has experienced success in the use of DBDs in areas such as development of plant modifications, development of the reliability-centered maintenance program, procedure upgrades, improved document retrieval, resolution of regulatory issues, and training. The paper examines the design basis development process, supporting projects, and expected improvements in plant operations as a result of these efforts

  17. A 10-MWe solar-thermal central-receiver pilot plant: Solar facilities design integration. Plant operating/training manual (RADL-Item 2-36)

    Science.gov (United States)

    1982-07-01

    Plant and system level operating instructions are provided for the Barstow Solar Pilot Plant. Individual status instructions are given that identify plant conditions, process controller responsibilities, process conditions and control accuracies, operating envelopes, and operator cautions appropriate to the operating condition. Transition operating instructions identify the sequence of activities to be carried out to accomplish the indicated transition. Most transitions involve the startup or shutdown of an individual flowpath. Background information is provided on collector field operations, and the heliostat groupings and specific commands used in support receiver startup are defined.

  18. Effects of delaying the operation of a nuclear power plant

    International Nuclear Information System (INIS)

    Hill, L.J.; Rainey, J.A.; Tepel, R.C.; Van Dyke, J.W.

    1983-12-01

    This report documents a study of an actual 24-month nuclear power plant licensing delay. A representative utility was chosen for examination. The research was oriented toward determination of the licensing delay's impact on the utility's operating results, ratepayers, and security issues. The methodology utilized to estimate those impacts involved the recursive interaction of a generation costing program to estimate replacement fuel costs and a financial regulatory model to concomitantly determine the impact on the utility, its ratepayers and security issues. The latter model was executed under six alternate scenarios: (1) no delay in the plant's operation; (2) a 24-month delay; (3) a 24-month delay but further assuming all replacement power was generated by coal-fired plants; (4) a 24-month delay assuming all replacement power from oil-fired plants; (5) no delay but assuming the capital cost of the plant was twice as large; and (6) a 24-month delay with the capital cost of the plant twice as large. Three primary conclusions were made. First, under all scenarios, a 24-month delay in operation of the plant has an adverse impact on the utility's internal generation of funds. Second, although electricity rates are not appreciably affected by the delay, the direction of electricity price changes is contingent on the source of fuel used for replacement power. Finally, a 24-month delay has an adverse impact on the indicators used to evaluate the financial soundness of the utility in all cases under consideration

  19. Cyclic operation of power plant; Cyklisk drift av kraftvaermeverk

    Energy Technology Data Exchange (ETDEWEB)

    Storesund, Jan

    2007-12-15

    The great majority of power plants are designed for base load operation with a relatively small number of starts and stops per year. Therefore, there has been no need to consider fatigue at design. Over the last few years operation with more frequent starts and stops exists as a consequence of swinging electricity prices that has become common. This involves significantly higher frequency of damages; not least fatigue relates damages, and the number of severe failures in components that never before have had damage problems may increase as well. In the present work the different types of component that may suffer from cyclic operation related damage are gathered by a literature survey and described as follows: - where and how the damages comes up, - constructions that should be avoided, - non-destructive testing (NDT) for damage that may come up under cyclic operation, - calculation and assessment of integrity of critical components - areas where continued research would be valuable. Recommendations have been put together to be used to prevent cyclic operation related damage and to detect it in time. The target group for this study is i) plant owners of plants where cyclic operation is or may be present, ii) researchers in the area, and, iii) inspectors and NDT-operators. There are quite a number of components where cyclic operation has been found to significantly influence the lift time. Some of these components are described in many papers whereas occasional papers have been found for others. The amount of information that is possible to get for a certain component is likely related to its significance for cyclic operation damage. The most frequently reported problem is ligament cracking of high temperature headers. Other components where extensive studies have been done are: wall panels, creep-fatigue loaded welds and turbine components

  20. Phenomenology of maximal and near-maximal lepton mixing

    International Nuclear Information System (INIS)

    Gonzalez-Garcia, M. C.; Pena-Garay, Carlos; Nir, Yosef; Smirnov, Alexei Yu.

    2001-01-01

    The possible existence of maximal or near-maximal lepton mixing constitutes an intriguing challenge for fundamental theories of flavor. We study the phenomenological consequences of maximal and near-maximal mixing of the electron neutrino with other (x=tau and/or muon) neutrinos. We describe the deviations from maximal mixing in terms of a parameter ε(equivalent to)1-2sin 2 θ ex and quantify the present experimental status for |ε| e mixing comes from solar neutrino experiments. We find that the global analysis of solar neutrino data allows maximal mixing with confidence level better than 99% for 10 -8 eV 2 ∼ 2 ∼ -7 eV 2 . In the mass ranges Δm 2 ∼>1.5x10 -5 eV 2 and 4x10 -10 eV 2 ∼ 2 ∼ -7 eV 2 the full interval |ε| e mixing in atmospheric neutrinos, supernova neutrinos, and neutrinoless double beta decay

  1. Strategy for improving instrumentation and control in operating nuclear power plants

    International Nuclear Information System (INIS)

    Abad Bassols, L.; Nino Perote, R.

    1996-01-01

    There are three basic reasons why nuclear power plants need to systematically upgrade their instrumentation and control equipment: Obsolete instrumentation and lack spares Little capacity of flexibility for extension Possibility of attaining better systems integration and improving systems-operations interface This article shows how to approach these issues using the following strategies: Use of distributed control systems and PLCs for control, signalling, command, communications, etc, in both nuclear and conventional applications Upgrading of process instrumentation equipment, sensors, transmitters, etc Upgrading of alarm-signalling systems In each group of equipment items consideration should be given to: Aspects regarding manufacturers-suppliers Effects on design, adaptation and documentation of operating plants Effects on the training and handling skills of operation and maintenance staff Strategy for incorporating the new system into the Plant with minimum impact on operation (Author)

  2. Operation management of thermal power plant. Karyoku plant no unten kanri

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-15

    Nowadays, thermal power plants are getting bigger and bigger in capacity. At the same time, high reliability to the frequent start and stop due to the demand change as well as effective economy. This paper describes the total operation management system. It included the start and stop, normal operation, specified operation, water quality, operation management involving the environmental problems, protection of machinery and equipment in case of emergency, measures against the failure, and the measures against the disaster. The outline of the normal operation is as follows: from the cost economical point of view, the kind of fuel is changed according to the load; i.e., coal for basic operation, LNG for basic to medium operation, and oil for medium to peak operation. The change in demand cannot be followed by the hydroelectric power. The adjustment of the power depending on the load change can be achieved by the thermal power generation. The automatic frequency control, economical load distribution control are also done. In the nighttime, the minimum load operation is required. The voltage change operation below the rated value or the phase-advancing operation is also done depending on the load conditions. 21 figs., 6 tabs.

  3. Information management system for design, construction and operation of nuclear power plants

    International Nuclear Information System (INIS)

    Bolch, M.C.; Jones, C.R.

    1990-01-01

    This paper describes the principal requirements and features of a computerized information management system (IMS) believed to be a necessary part of the program to design, build and operate the next generation of nuclear power plants in the United States. This way a result of extensive review and input from an industry group studying future nuclear power plant construction improvements. The needs of the power plant constructor, owner and operator for such a computerized technical data base are described in terms of applications and scope and timing of turnover of the IMS by the plant designer. The applications cover the full life cycle of the plant including project control, construction activities, quality control, maintenance and operation. The scope of the IMS is also described in terms of the technical data to be included, hardware and software capabilities and training. The responsibilities of the plant designer for developing the IMS and generating the technical data base is defined as part of the plant process. The requirements to be met include a comprehensive plant data model and computer system hardware and software

  4. Information management system for design, construction and operation of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Bolch, M.C. (Duke Power Co. (US)); Jones, C.R. (S. Levy Inc. (US))

    1990-01-01

    This paper describes the principal requirements and features of a computerized information management system (IMS) believed to be a necessary part of the program to design, build and operate the next generation of nuclear power plants in the United States. This way a result of extensive review and input from an industry group studying future nuclear power plant construction improvements. The needs of the power plant constructor, owner and operator for such a computerized technical data base are described in terms of applications and scope and timing of turnover of the IMS by the plant designer. The applications cover the full life cycle of the plant including project control, construction activities, quality control, maintenance and operation. The scope of the IMS is also described in terms of the technical data to be included, hardware and software capabilities and training. The responsibilities of the plant designer for developing the IMS and generating the technical data base is defined as part of the plant process. The requirements to be met include a comprehensive plant data model and computer system hardware and software.

  5. Start-up performance of parabolic trough concentrating solar power plants

    DEFF Research Database (Denmark)

    Ferruzza, Davide; Topel, Monika; Basaran, Ibrahim

    2017-01-01

    Concentrating solar power plants, even though they can be integrated with thermal energy storage, are still subjected to cyclic start-up and shut-downs. As a consequence, in order to maximize their profitability and performance, the flexibility with respect to transient operations is essential...

  6. Seabrook, N.H. Wastewater Treatment Plant Chief Operator Recognized for Outstanding Service

    Science.gov (United States)

    Dustin Price, a resident of Berwick Maine and the Chief Operator of the Seabrook, N.H. Wastewater Treatment Plant, was honored by EPA with a 2016 Regional Wastewater Treatment Plant Operator of the Year Excellence Award.

  7. Safety in nuclear power plant operation, including commissioning and decommissioning. A code of practice

    International Nuclear Information System (INIS)

    1978-01-01

    Safe operation of a nuclear power plant postulates satisfactory siting, design, construction and commissioning, together with proper management and operation of the plant. This Code of Practice deals with the safety aspects of management, commissioning, operation and decommissioning of the plant. It forms part of the Agency's programme, referred to as the NUSS programme, for establishing Codes of Practice and Safety Guides relating to land-based stationary thermal neutron power plants. It has been prepared for the use of those responsible for the operation of stationary nuclear power plants, the main function of which is the generation of electrical and/or thermal power, and for the use of those responsible for regulating the operation of such plants. It is not intended for application to reactors used solely for experimental or research purposes. The provisions in the Code are designed to provide assurance that operational activities are carried out without undue radiological hazard to the general public and to persons on the site. It should be understood that the provisions in the Code set forth minimum requirements which shall be met in order to achieve safe operation of a nuclear power plant

  8. Tianwan nuclear power plant operation and management practices

    International Nuclear Information System (INIS)

    Gu Yingbing

    2010-01-01

    Tianwan Nuclear Power Station is a high-tech cooperation project in nuclear sector in the spirit of promoting the political relationship, economic trading and international strategic partnership between China and Russia. It was listed as one of the key nuclear projects to be constructed during the 'Ninth Five-Year' Plan. In this article the author summarizes and feedbacks the practices of operation management in Tianwan Nuclear Power Station in 7 aspects of safety culture construction, operation team building, daily operation management, operation document management, plant chemistry control and management, solid, liquid and gaseous waste management and control of operation performance indicators. (author)

  9. Advanced light water reactor plant

    International Nuclear Information System (INIS)

    Giedraityte, Zivile

    2008-01-01

    For nuclear power to be competitive with the other methods of electrical power generation the economic performance should be significantly improved by increasing the time spent on line generating electricity relative to time spent off-line conducting maintenance and refueling. Maintenance includes planned actions (surveillances) and unplanned actions (corrective maintenance) to respond to component degradation or failure. A methodology is described which is used to resolve maintenance related operating cycle length barriers. Advanced light water nuclear power plant is designed with the purpose to maximize online generating time by increasing operating cycle length. (author)

  10. ILK statement on determining operation periods for nuclear power plants in Germany

    International Nuclear Information System (INIS)

    2005-09-01

    The question of how long nuclear power plants (NPPs) can be safely operated while maintaining a high safety standard played an important role in the worldwide expert discussion in recent years. Far-reaching agreement exists on which reviews and measures to undertake in order to safely operate such plants over longer time periods. In most countries operating licenses for NPPs are not limited in time; this is also the case for Germany. However, the authorization for power operation expires if the plant has used up its approved electricity generation quota. This quota corresponds to a value established in the Atomic Energy Act (AtG) for the individual unit that is based on an operating time of 32 years. On the basis of operating experiences gathered with plants currently in operation and also due to available research findings, the ILK believes that there are no safetyrelated reasons for limiting the operating time of nuclear power plants a priori. The ILK notes that the German NPPs have a high safety standard that is constantly monitored by the regulatory authority. Periodic safety reviews (PSRs), which are performed every ten years, are part of this process. The ILK also takes the view, however, that in the case of very long operating periods, it makes sense to make the continued operation depend on a renewed evaluation (of the plant). This requires demonstrating that the plant displays a level of safety that corresponds to the requirements for the future operating period. The ILK recommends the following approach: - The limitation of production quotas currently laid down in the German Atomic Energy Act should be lifted; - In addition to maintaining the current safety standard, licensees should examine improvement measures for the further reduction of the residual risk and, where appropriate, apply these. The effectiveness of the PSR in its current form should be assessed and the guidelines for their application should be updated, if necessary; - After an operating

  11. Effect of design and operation of modern ammonia plants on the performance of integrated heavy water plants (Paper No. 2.1)

    International Nuclear Information System (INIS)

    Kumar, Manoj; Haldar, T.K.; Gupta, S.K.; Ramamurty, C.B.

    1992-01-01

    The heavy water plant being parasitic in nature, its design, operation and performance is affected to a great extent by the design, performance and operation of the ammonia plant. Some of the factors which affect the performance of heavy water plant such as on-stream hours and capacity utilisation of the ammonia plant, deuterium concentration (D/D+H) in feed synthesis gas, operating pressure of synthesis loop of ammonia plant, composition of feed synthesis gas, and level of oxygenated impurities in feed synthesis gas are described in this paper. (author). 3 tabs., 4 figs

  12. Development of on-line operator aid system (OASYSTM) for nuclear power plants

    International Nuclear Information System (INIS)

    Kang, Ki Sig; Choi, Seong Soo; Kim, Han Gon; Chang, Soon Heung; Jeong, Hee Kyo; Yi, Chul Un

    1994-01-01

    In this paper, the development of On - line operator Aid SYStem (OASYS TM ) are discussed by focusing attention on the importance of the operator's role for nuclear power plants. The OASYS TM is under development to support the operator's decision making process and to enhance the safety of a nuclear power plant by providing the plant operators with timely and proper guideline during abnormal and emergency conditions. The OASYS TM has capabilities for the signal validation/management, the alarm processing, the failure diagnosis using abnormal operating procedures, and the dynamic tracking of emergency operating procedures using function restoration guidelines and optimal recovery guidelines with a series of complex logic steps covering a broad spectrum of event sequences. The proposed system is being implemented on a SUN-4/75 Workstation using C and Quintus TM prolog language. For verification studies a full-scope real-time simulator is being used. Test results show that the OASYS TM is capable of diagnosing a plant failure quickly and providing an operator guideline with fast response time. After verification the OASYS TM will be installed in the simulator II of Kori nuclear training center

  13. A logic flowgraph-based concept for decision support and management of nuclear plant operation

    International Nuclear Information System (INIS)

    Guarro, S.B.

    1988-01-01

    The architecture of an automated decision support system for nuclear plant operators is presented and discussed. The system is based on the use of 'logic flowgraph' process models and is designed in a hierarchical fashion. Its functionality spans from 'function oriented' plant status and alternative success path information displayed to the plant operators at its higher access levels to 'process oriented' diagnostic and recovery information deduced and displayed at its lowest. The design basis for this architecture is the 'defense in depth' plant safety concept. The decision support system goal is to provide plant operators, in the presence of an unforeseen transient, with the best and safest alternative between plant stabilization after shutdown and recovery of normal operation based on early diagnosis. Examples of the system capability to interpret and diagnose abnormal plant conditions and of the information that it can supply to the operators at its three access levels are presented and discussed. (author)

  14. Remote operation and maintenance support services for nuclear power plants

    International Nuclear Information System (INIS)

    Yamamoto, Hiroki; Higuma, Koji; Shimizu, Shunichi; Sakuma, Masatake; Sonoda, Yukio; Kanemoto, Shigeru

    2004-01-01

    Toshiba Corporation constructed e-Toshiba Operating Plant Service (e-TOPS TM ) system and began remote operation and maintenance support service for nuclear power plants. The service put into practice remote operation and maintenance by harmony of information technologies such as internet and mobile, and nuclear power measurement/diagnostic technologies and security techniques. Outline of e-TOPS TM , remote-control service, -inspection system, -diagnostic service and technologies support service are explained. Construction, objects and application effects of e-TOPS TM , remote diagnostic system using image treatment techniques, construction of device record card control system are illustrated. (S.Y.)

  15. 75 FR 16524 - FirstEnergy Nuclear Operating Company, Perry Nuclear Power Plant; Exemption

    Science.gov (United States)

    2010-04-01

    ... Company, Perry Nuclear Power Plant; Exemption 1.0 Background FirstEnergy Nuclear Operating Company (FENOC... the Perry Nuclear Power Plant, Unit 1 (PNPP). The license provides, among other things, that the... date for all operating nuclear power plants, but noted that the Commission's regulations provide...

  16. Meteorological safeguarding of nuclear power plant operation in Czechoslovakia

    International Nuclear Information System (INIS)

    Rak, J.; Skulec, S.

    1976-01-01

    A meteorological tower 200 m high has to be built for meteorological control of the operation of the A-1 nuclear power plant at Jaslovske Bohunice. This meteorological station will measure the physical properties of the lower layers of the atmosphere, carry out experimental verifications of the models of air pollution, investigate the effects of waste heat and waste water from the nuclear power plant on the microclimate, provide the theoretical processing of measured data with the aim of selecting the most favourable model for conditions prevailing in the Czechoslovak Socialist Republic, perform basic research of the physical properties of the ground and boundary layers of the atmosphere and the coordination of state-wide plans in the field of securing the operation of nuclear power plants with regard to meteorology. (Z.M.)

  17. Toward autonomous operation and maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Kitamura, M.

    1994-01-01

    Issues toward realization of autonomous operation as well as maintenance of nuclear power plants are reviewed in this paper. First, the necessity and significance of the technical program aiming at the establishment of autonomous nuclear plant are discussed through reviewing the history and current status computerized operation of complex artifacts. Then, key technologies currently studied to meet the need within the framework of artificial intelligence (AI) and advanced robotics are described. Among such AI-technologies are distributed multi-agent system, operator thinking model, and advanced man-machine interface design. Advances in robot technology attained include active sensing technique and multi-unit autonomous maintenance robot systems. Techniques for simulation of human action have been pursued as basic issues for understanding mechanisms behind human behavior. In addition to the individual developments, methodological topics relevant to the autonomy of nuclear facilities are briefly addressed. The concepts called methodology diversity and dynamic functionality restoration (realization) are introduced and discussed as the underlining principles to be considered in the development of the autonomous nuclear power plants. (author)

  18. Inspection during operation of a nuclear power plant in Spain

    International Nuclear Information System (INIS)

    Gutierrez Bernal, R.

    1977-01-01

    The control and surveillance activities, as well as the operating data and results of the three nuclear power plants presently in operation: Jose Cabrera, Santa Maria de Garona and Vandellos, are summarized. The first two are light-water type, with different pressure and boiling characteristics and the third is of the gas-graphite type. The main aspects, from an inspection point of view, of the experience obtained in these three plants are analyzed. (author) [es

  19. Operation reliability analysis of independent power plants of gas-transmission system distant production facilities

    Science.gov (United States)

    Piskunov, Maksim V.; Voytkov, Ivan S.; Vysokomornaya, Olga V.; Vysokomorny, Vladimir S.

    2015-01-01

    The new approach was developed to analyze the failure causes in operation of linear facilities independent power supply sources (mini-CHP-plants) of gas-transmission system in Eastern part of Russia. Triggering conditions of ceiling operation substance temperature at condenser output were determined with mathematical simulation use of unsteady heat and mass transfer processes in condenser of mini-CHP-plants. Under these conditions the failure probability in operation of independent power supply sources is increased. Influence of environmental factors (in particular, ambient temperature) as well as output electric capability values of power plant on mini-CHP-plant operation reliability was analyzed. Values of mean time to failure and power plant failure density during operation in different regions of Eastern Siberia and Far East of Russia were received with use of numerical simulation results of heat and mass transfer processes at operation substance condensation.

  20. Operation of Finnish nuclear power plants. Quarterly report, 1st quarter 1998

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1998-11-01

    Quarterly reports on the operation of Finnish NPPs describe events and observations relating to nuclear and radiation safety that the Radiation and Nuclear Safety Authority (STUK) considers safety significant. Safety improvements at the plants are also described. The report includes a summary of the radiation safety of plant personnel and the environment and tabulated data on the plants' production and load factors. The Finnish NPP units were in power operation for the whole first quarter of 1998. All the units were in long-term test operation at uprated power level authorised by STUK. The load factor average of the plant units was 100.8%. An oil leak at Olkiluoto NPP Unit 2 caused an ignition that was promptly extinguished. A subsequent appraisal of the event disclosed deficiencies in the functioning of the plant unit's operating organization and the event was classified INES level 1. Other events in this quarter had no bearing on nuclear or radiation safety. Occupational doses and radioactive releases off-site were below authorized limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. (orig.)

  1. The use of flow models for design of plant operating procedures

    International Nuclear Information System (INIS)

    Lind, M.

    1982-03-01

    The report describe a systematic approach to the design of operating procedures or sequence automatics for process plant control. It is shown how flow models representing the topology of mass and energy flows on different levels of function provide plant information which is important for the considered design problem. The modelling methodology leads to the definition of three categories of control tasks. Two tasks relate to the regulation and control of changes of levels and flows of mass and energy in a system within a defined mode of operation. The third type relate to the control actions necessary for switching operations involved in changes of operating mode. These control tasks are identified for a given plant as part of the flow modelling activity. It is discussed how the flow model deal with the problem of assigning control task precedence in time eg. during start-up or shut-down operations. The method may be a basis for providing automated procedure support to the operator in unforeseen situations or may be a tool for control design. (auth.)

  2. Adaptive maximal poisson-disk sampling on surfaces

    KAUST Repository

    Yan, Dongming

    2012-01-01

    In this paper, we study the generation of maximal Poisson-disk sets with varying radii on surfaces. Based on the concepts of power diagram and regular triangulation, we present a geometric analysis of gaps in such disk sets on surfaces, which is the key ingredient of the adaptive maximal Poisson-disk sampling framework. Moreover, we adapt the presented sampling framework for remeshing applications. Several novel and efficient operators are developed for improving the sampling/meshing quality over the state-of-theart. © 2012 ACM.

  3. Lessons learned from the Maintenance Rule implementation at Northeast Utilities operating plants

    International Nuclear Information System (INIS)

    Hastings, K.B.; Khalil, Y.F.; Johnson, W.

    1996-01-01

    The Maintenance Rule as described in 10CFR50.65 requires holders of all operating nuclear power plants to monitor the performance of structures, systems, and components (SSCs) against licensee-established performance criteria. The Industry with the assistance of the Nuclear Energy Institute (NEI) developed a guideline, which includes all parts of the Maintenance Rule, to establish these performance criteria while incorporating safety and reliability of the operating plants. The NUMARC 93-01 Guideline introduced the term ''Risk Significant'' to categorize subsets of the SSCs which would require increased focus, from a Maintenance Rule perspective, in setting their performance criteria. Northeast Utilities Company (NU) operates five nuclear plants three at Millstone Station in Waterford, Connecticut; the Connecticut Yankee plant in Haddam Neck, Connecticut; and the Seabrook Station in Seabrook, New Hampshire. NU started the implementation process of the Maintenance Rule program at its five operating plants since early 1994, and have identified a population of risk significant SSCs at each plant. Recently, Northeast Utilities' Maintenance Rule Team re-examined the initial risk significant determinations to further refine these populations, and to establish consistencies among its operating units. As a result of the re-examination process, a number of inconsistencies and areas for improvement have been identified. The lessons learned provide valuable insights to consider in the future as one implements more risk based initiatives such as Graded QA and Risk-Based ISI and IST. This paper discusses the risk significance criteria, how Northeast Utilities utilized NUMARC 93-01 Guideline to determine the risk significant SSCs for its operating plants, and lessons learned. The results provided here do not include the Seabrook Station

  4. Quality assurance during operation of a nuclear power plant

    International Nuclear Information System (INIS)

    Stolz, J.

    1980-01-01

    The lecture provides a description of the QA manual as operated in French nuclear power plants. Oral comments will include discussion of some difficulties in actual implementation. Also examples will be given of incidents in nuclear plants, which could have been mitigated or fully prevented by QA attitude. (orig./RW)

  5. Safety of Nuclear Power Plants: Commissioning and Operation. Specific Safety Requirements

    International Nuclear Information System (INIS)

    2017-01-01

    This publication is a revision of IAEA Safety Standards Series No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe commissioning, operation, and transition from operation to decommissioning of nuclear power plants. Over recent years there have been developments in areas such as long term operation of nuclear power plants, plant ageing, periodic safety review, probabilistic safety analysis review and risk informed decision making processes. It became necessary to revise the IAEA’s Safety Requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the IAEA Safety Standards Series No. SF-1, Fundamental Safety Principles. A review of Safety Requirements publications, initiated in 2011 following the accident in the Fukushima Daiichi nuclear power plant in Japan, revealed no significant areas of weakness but resulted in a small set of amendments to strengthen the requirements and facilitate their implementation. These are contained in the present publication.

  6. The long term operation of nuclear power plants in the US

    International Nuclear Information System (INIS)

    Young, G.G.

    2015-01-01

    The NRC has so far granted the renewal license for 73 nuclear reactors in the US but because of economic issues some power plants that got a renewal license are planned to be decommissioned earlier: for instance the Oyster Creek reactor will be stopped definitely in 2019 after a 50 year operating life, another example is the Kewaunee plant that closed mid 2013 while this reactor had been allowed to operate till 2033. The economy concern is the falling price of natural gas that make gas-burning power plants more competitive than nuclear stations. The reactors at risk are the oldest and the smallest ones but in the non-deregulated sector the economic benefit is important for the most powerful reactors to be allowed to operate over 40 and 60 years. A renewal request is composed of a safety assessment of the plant and the assessment of its environmental impact. The safety assessment relies on an Integrated Plant Assessment and on a Time-Limited Ageing Analyses. In order to prepare the second renewal campaign that will allow some reactors to operate up to 80 years, NRC, DOE and EPRI have begun first to identify potential concerns concerning material degradation and secondly to develop an adequate ageing management strategy. (A.C.)

  7. Simulation of nuclear plant operation into a stochastic energy production model

    International Nuclear Information System (INIS)

    Pacheco, R.L.

    1983-04-01

    A simulation model of nuclear plant operation is developed to fit into a stochastic energy production model. In order to improve the stochastic model used, and also reduce its computational time burdened by the aggregation of the model of nuclear plant operation, a study of tail truncation of the unsupplied demand distribution function has been performed. (E.G.) [pt

  8. Development of operator thinking model and its application to nuclear reactor plant operation system

    International Nuclear Information System (INIS)

    Miki, Tetsushi; Endou, Akira; Himeno, Yoshiaki

    1992-01-01

    At first, this paper presents the developing method of an operator thinking model and the outline of the developed model. In next, it describes the nuclear reactor plant operation system which has been developed based on this model. Finally, it has been confirmed that the method described in this paper is very effective in order to construct expert systems which replace the reactor operator's role with AI (artificial intelligence) systems. (author)

  9. Contributions of leaf photosynthetic capacity, leaf angle and self-shading to the maximization of net photosynthesis in Acer saccharum: a modelling assessment.

    Science.gov (United States)

    Posada, Juan M; Sievänen, Risto; Messier, Christian; Perttunen, Jari; Nikinmaa, Eero; Lechowicz, Martin J

    2012-08-01

    Plants are expected to maximize their net photosynthetic gains and efficiently use available resources, but the fundamental principles governing trade-offs in suites of traits related to resource-use optimization remain uncertain. This study investigated whether Acer saccharum (sugar maple) saplings could maximize their net photosynthetic gains through a combination of crown structure and foliar characteristics that let all leaves maximize their photosynthetic light-use efficiency (ε). A functional-structural model, LIGNUM, was used to simulate individuals of different leaf area index (LAI(ind)) together with a genetic algorithm to find distributions of leaf angle (L(A)) and leaf photosynthetic capacity (A(max)) that maximized net carbon gain at the whole-plant level. Saplings grown in either the open or in a forest gap were simulated with A(max) either unconstrained or constrained to an upper value consistent with reported values for A(max) in A. saccharum. It was found that total net photosynthetic gain was highest when whole-plant PPFD absorption and leaf ε were simultaneously maximized. Maximization of ε required simultaneous adjustments in L(A) and A(max) along gradients of PPFD in the plants. When A(max) was constrained to a maximum, plants growing in the open maximized their PPFD absorption but not ε because PPFD incident on leaves was higher than the PPFD at which ε(max) was attainable. Average leaf ε in constrained plants nonetheless improved with increasing LAI(ind) because of an increase in self-shading. It is concluded that there are selective pressures for plants to simultaneously maximize both PPFD absorption at the scale of the whole individual and ε at the scale of leaves, which requires a highly integrated response between L(A), A(max) and LAI(ind). The results also suggest that to maximize ε plants have evolved mechanisms that co-ordinate the L(A) and A(max) of individual leaves with PPFD availability.

  10. Palisades Nuclear Plant. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    The first half of this period was a continuation of Outage 74-4. Retubing of the main condenser was completed and additional Eddy Current Testing in the steam generators was accomplished. On April 2, 1975 the unit returned to service to conduct the Steam Generator Flushing Program. From April 2 through June 20, 1975 the plant operated at power levels up to 90 percent, with two brief outage interruptions. On April 6, the turbine was tripped because of a leak in the flow instrument tap in the drain line from a feedwater heater to the moisture separator drain tank and on April 22, the turbine tripped due to low oil pressure in the electrohydraulic control system caused by a cracked fitting in the piping to a governor valve. In both instances, the plant was returned to service in a matter of a few hours. The plant was removed from service from June 20 until June 30, 1975 for control rod drive seal repair. The plant resumed operation on June 30, 1975. After a few hours' operation, an erratic feedwater control system tripped the unit from service; however, the unit returned to service the same day. An all volatile treatment program for secondary water has achieved reasonable water chemistry stability and continuous blowdown has removed small quantities of phosphate from the steam generators. Operation continued with two low pressure feedwater heaters and drain cooler bypassed in each train, pending retubing of the feedwater heaters. Two rows of blading of a low pressure turbine were replaced. (U.S.)

  11. Inter-plant coordination and its relationships with supply chain integration and operational performance

    DEFF Research Database (Denmark)

    Yang, Cheng; Chaudhuri, Atanu; Farooq, Sami

    2016-01-01

    Based on the data obtained from the sixth version of International Manufacturing Strategy Survey (IMSS VI), this paper explores the relationships at the level of plant between (1) inter-plant coordination and operational performance, and (2) between inter-plant coordination and internal/external ......Based on the data obtained from the sixth version of International Manufacturing Strategy Survey (IMSS VI), this paper explores the relationships at the level of plant between (1) inter-plant coordination and operational performance, and (2) between inter-plant coordination and internal...

  12. Analysis of Pending Problems for a Technology Demand of Domestic Operational Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Koo, Dae Seo; Park, Won Seok; Wi, Myung Hwan; Ha, Jae Joo

    2008-01-15

    Eleven technology fields were chosen, which have a relation with the solution of the pending problems of domestic operational nuclear power plants to manage an efficient operation and safe regulation for domestic nuclear power plants. The progressive background, requirements, and performance on the pending problems, 34, of an operation and regulation for domestic nuclear power plants were analyzed with regard to a risk information application, severe accident, PSR of structural materials, underwater monitoring, operation inspection and a fire protection, an instrument aging, metal integrity and steam generator, human technology and a digital I and C, quality assurance, secondary system and a user reliance and mass communications. KAERI's role is to provide a solution to these pending problems of domestic nuclear power plants. KAERI's technology is to be applicable to the pending problems for domestic nuclear power plants to raise an operational efficiency and an application frequency of nuclear power plants. In the future, a technology treaty between KAERI and KHNP is to be established to solve the pending problems for domestic nuclear power plants. Operation rate of nuclear power plants will also be raised and contribute to the supply of national energy due to this technology treaty.

  13. OSART mission highlights 1989-1990: Operational safety practices in nuclear power plants

    International Nuclear Information System (INIS)

    1992-12-01

    The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States in enhancing the operational safety of nuclear power plants. OSART reviews are available to all countries with nuclear power plants in operation or approaching operation. Most of these countries have participated in the programme, by hosting one or more OSART missions or by making experts available to participate in missions. Careful design and high quality of construction are prerequisites for a safe nuclear power plant. However, a plant's safety depends ultimately on the ability and conscientiousness of the operating personnel and on their tools and work methods. OSART missions assess a facility's operational practices in comparison with those used successfully in other countries, and exchange, at the working level, ideas for promoting safety. Both the plants reviewed and the organizations providing experts have benefited from the programme. The observations of the OSART members are documented in technical notes which are then used as source material for the official OSART Report submitted to the government of the host country. The technical notes contain recommendations for improvements and descriptions of recommendable good practices. The same notes have been used to compile the present summary report which is intended for wide distribution to all organizations constructing, operating or regulating nuclear power plants. This report is the fourth in a series following IAEA-TECDOC-458, IAEA-TECDOC-497 and IAEA-TECDOC-570 and covers the period June 1989 to December 1990. Reference is also made to a summary report of Pre-OSART missions, which is in preparation. In addition, a report presenting OSART Good Practices has been published (IAEA-TECDOC-605)

  14. A method for risk informing procedures at operating nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, P. F.; Martin del Campo, C., E-mail: pnelson_007@yahoo.com [UNAM, Facultad de Ingenieria, Departamento de Sistemas Energeticos, Paseo Cuauhnahuac No. 8532, Col. Progreso, 62550 Jiutepec, Morelos (Mexico)

    2012-10-15

    The technical approach presented establishes a framework intended to provide the necessary elements for a deployable human performance monitoring program that incorporates insights from plant specific probabilistic risk assessments, human reliability analysis, as well as the development of plant specific human failure data. A human performance monitoring program of this structure would be used to provide the ability to risk inform procedures (e.g., operations or maintenance) to determine the operational risk significance of procedural performance (i.e., precautions, prerequisites, procedure steps), the likelihood of consequential human error dur the performance of the procedure, and the identification of procedure specific barriers to reduce or eliminate consequential human errors. The program would provide the means to assess procedures prior to execution and the means to record and trend human failure events leading to a plant specific human failure database for human activities characterized as pre-initiator. The technical methods and data processing for each of these areas are developed and presented, as well as an example application of an operational procedure error leading to a plant level event (i.e, plant trip). (Author)

  15. Annual radiological environmental operating report, Browns Ferry Nuclear Plant, 1988

    International Nuclear Information System (INIS)

    1989-04-01

    This report describes the environmental radiological monitoring program conducted by TVA in the vicinity of Browns Ferry Nuclear Plant in 1988. The program includes the collection of samples from the environment and the determination of the concentrations of radioactive materials in the samples. Samples are taken from stations in the general area of the plant and from areas not influenced by plant operations. Station locations are selected after careful consideration of the weather patterns and projected radiation doses to the various areas around the plant. Material sampled includes air, water, milk, foods, vegetation, soil, fish, sediment, and direct radiation levels. Results from stations near the plant are compared with concentrations from control stations and with preoperational measurements to determine potential impacts of plant operations. The vast majority of the exposures calculated from environmental samples were contributed by naturally occurring radioactive materials or from materials commonly found in the environment as a result of atmospheric nuclear weapons fallout. Small amounts of Co-60 were found in sediment samples downstream from the plant. This activity in stream sediment would result in no measurable increase over background in the dose to the general public. 3 refs., 2 figs., 2 tabs

  16. SIMULTANEOUS SCHEDULING AND OPERATIONAL OPTIMIZATION OF MULTIPRODUCT, CYCLIC CONTINUOUS PLANTS

    Directory of Open Access Journals (Sweden)

    A. Alle

    2002-03-01

    Full Text Available The problems of scheduling and optimization of operational conditions in multistage, multiproduct continuous plants with intermediate storage are simultaneously addressed. An MINLP model, called TSPFLOW, which is based on the TSP formulation for product sequencing, is proposed to schedule the operation of such plants. TSPFLOW yields a one-order-of-magnitude CPU time reduction as well as the solution of instances larger than those formerly reported (Pinto and Grossmann, 1994. Secondly, processing rates and yields are introduced as additional optimization variables in order to state the simultaneous problem of scheduling with operational optimization. Results show that trade-offs are very complex and that the development of a straightforward (rule of thumb method to optimally schedule the operation is less effective than the proposed approach.

  17. SIMULTANEOUS SCHEDULING AND OPERATIONAL OPTIMIZATION OF MULTIPRODUCT, CYCLIC CONTINUOUS PLANTS

    Directory of Open Access Journals (Sweden)

    Alle A.

    2002-01-01

    Full Text Available The problems of scheduling and optimization of operational conditions in multistage, multiproduct continuous plants with intermediate storage are simultaneously addressed. An MINLP model, called TSPFLOW, which is based on the TSP formulation for product sequencing, is proposed to schedule the operation of such plants. TSPFLOW yields a one-order-of-magnitude CPU time reduction as well as the solution of instances larger than those formerly reported (Pinto and Grossmann, 1994. Secondly, processing rates and yields are introduced as additional optimization variables in order to state the simultaneous problem of scheduling with operational optimization. Results show that trade-offs are very complex and that the development of a straightforward (rule of thumb method to optimally schedule the operation is less effective than the proposed approach.

  18. Natural gas infrastructure requirements for merchant plant

    International Nuclear Information System (INIS)

    Sukaly, B.

    1998-01-01

    Merchant power plants are complicated with diverse risks. Of course where there are risks there are opportunities for reward. Creating an effective merchant plant requires a strong organization that is committed to marketing, trading and risk management. The organization must have the infrastructure to capitalize on the opportunities a merchant plant provides. The market dynamics are ever changing and move at incredible speeds--what was a moneymaking deal yesterday is no longer valid today. The merchant plant owner is the expert in setting up the actual infrastructure for trading the various commodities, including forward pricing, cash and physical trades, transportation and operation for maximizing the plant's potential. Optionally, the plant's risk profile and a risk management program are the key factors in determining the sucres of the merchant plant project

  19. Water use in the development and operation of geothermal power plants.

    Energy Technology Data Exchange (ETDEWEB)

    Clark, C. E.; Harto, C. B.; Sullivan, J. L.; Wang, M. Q. (Energy Systems); ( EVS)

    2010-09-17

    Geothermal energy is increasingly recognized for its potential to reduce carbon emissions and U.S. dependence on foreign oil. Energy and environmental analyses are critical to developing a robust set of geothermal energy technologies. This report summarizes what is currently known about the life cycle water requirements of geothermal electric power-generating systems and the water quality of geothermal waters. It is part of a larger effort to compare the life cycle impacts of large-scale geothermal electricity generation with other power generation technologies. The results of the life cycle analysis are summarized in a companion report, Life Cycle Analysis Results of Geothermal Systems in Comparison to Other Power Systems. This report is divided into six chapters. Chapter 1 gives the background of the project and its purpose, which is to inform power plant design and operations. Chapter 2 summarizes the geothermal electricity generation technologies evaluated in this study, which include conventional hydrothermal flash and binary systems, as well as enhanced geothermal systems (EGS) that rely on engineering a productive reservoir where heat exists but water availability or permeability may be limited. Chapter 3 describes the methods and approach to this work and identifies the four power plant scenarios evaluated: a 20-MW EGS plant, a 50-MW EGS plant, a 10-MW binary plant, and a 50-MW flash plant. The two EGS scenarios include hydraulic stimulation activities within the construction stage of the life cycle and assume binary power generation during operations. The EGS and binary scenarios are assumed to be air-cooled power plants, whereas the flash plant is assumed to rely on evaporative cooling. The well field and power plant design for the scenario were based on simulations using DOE's Geothermal Economic Technology Evaluation Model (GETEM). Chapter 4 presents the water requirements for the power plant life cycle for the scenarios evaluated. Geology

  20. Developments in operator assistance techniques for nuclear power plant control and operation

    International Nuclear Information System (INIS)

    Poujol, A.; Papin, B.; Beltranda, G.; Soldermann, R.

    1989-01-01

    This paper describes an approach which has been developed in order to improve nuclear power plants control and monitoring in normal and abnormal situations. These developments take full advantage of the trend towards the computerization of control rooms in industrial continuous processes. This research program consists in a thorough exploration of different information processing techniques, ranking from the rather simple visual synthetization of informations on graphic displays to sophisticated Artificial Intelligence (AI) techniques. These techniques are put into application for the solving of man-machine interface problems in the different domains of plant operation

  1. Effect of wood fuels on power plant operability

    International Nuclear Information System (INIS)

    Orjala, M.; Ingalsuo, R.

    2001-01-01

    The objective of the research is to determine the critical properties of wood fuels on the basis of power plant operability, to determine the optimal conditions for reduction of harmful detriments, and to study how the storage and processing of wood fuels effect on the operability. Both the CFB and BFB technologies are studied. The project started in December 2000 and it will be ended by the end of 2002. Experts of the Fuels and Combustion research field of VTT Energy carry out the main parts of the research. Experts of the research field of Mineral Processing of VTT Chemical Technology, located in Outokumpu, and Kemian tutkimuspalvelut Oy/Oulu University, located in Outokumpu, participate in the analytics, and the research field of Materials and Manufacturing Technology of VTT Manufacturing Technology in Otaniemi participates in the research on material effects. System Technology Laboratory of Oulu University carries out the power plant automation and boiler control technology research under supervision of Professor Urpo Kortela. Co-operation with the materials research unit of EU's JRC, located in Petten, which started in the research 'Combustion of Forest Chips', will be continues in this research. Co-operation will be made with Swedish Vaermeforsk in the field of information exchange on experiences in utilisation of wood fuels in Swedish power plants and possibilities to join in the projects of Vaermeforsk in this research field. Following companies participate in the project: Etelae-Savon Energia Oy, Foster Wheeler Energia Oy, Kvaerner Pulping Oy, Simpele pasteboard factory of M-Real Oyj and Vaermeforsk AB (Sweden). (orig.)

  2. Irradiated Concrete in Nuclear Power Plants: Bridging the Gap in Operational Experience

    International Nuclear Information System (INIS)

    Hohmann, Brian P.; Esselman, Thomas C.; Wall, James J.

    2012-01-01

    The world's fleet of operating nuclear power plants (NPP) has been in-service for more than 20 years. In order to support the increasing demand for inexpensive power, many plants will be required to operate beyond 40 years, which was the original licensing period for existing NPPs. Improved knowledge of the performance of irradiated concrete is required to form a technical basis for long term operation (operation to 80+ years) of nuclear plants around the world. To date, operating experience (OE) of concrete subjected to irradiation has been acceptable, but there is an absence of data on this topic for extended periods of operation. The lack of empirical data has contributed to the difficulty of quantifying the long term behavior of concrete that is experiencing irradiation. Programs are in place that address other degradation mechanisms of concrete, but a clear and focused program is required on the effects of radiation. This paper presents a review of the available literature on the topic of the long-term irradiation effects on the mechanical properties of concrete, and provides a proposed methodology for the characterization of irradiated concrete removed from shut down or decommissioned commercial plants. (author)

  3. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1992-12-01

    The Finnish nuclear power plant units Loviisa 1 and 2 as well TVO I and II were in operation for almost the whole second quarter of 1992. Longer breaks in production were caused by the annual maintenance of the TVO plant units. The load factor was 87.4 %. At TVO I it was detected during the annual maintenance outage when removing nuclear fuel assemblies from the reactor that one assembly had been loaded into the reactor in an incorrect manner during the previous year's annual maintenance: the assembly was slightly higher than the other assemblies. The water cooling the nuclear fuel partly by-passed the fuel assembly and the coolant flow proper passing through the assembly was below design. The fuel assembly's cooling had been sufficient during the whole operating cycle but could have essentially deteriorated during certain transients with the danger of consequent damage to some fuel rods. On the International Nuclear Event Scale the event is classified as level 1. Other events in this quarter which are classified on the International Nuclear Event Scale were level 0/below scale on the scale

  4. Plant life management for long term operation of light water reactors. Principles and guidelines

    International Nuclear Information System (INIS)

    2006-01-01

    The subject of this report was originally suggested by the IAEA Technical Working Group on Life Management of Nuclear Power Plants. It was then approved by the IAEA for work to begin in 2004. The participants in the group felt that it was time to address plant life management and ageing issues from the point of view of long term operation and licence renewal. It is believed that the nuclear power industry will only be able to survive if plant economics are favourable and safety is maintained. Therefore, the issue of ageing and obsolescence has to be addressed from an operational and safety standpoint, but also in the context of plant economics in terms of the cost of electricity production, including initial and recurring capital costs. Use of new technologies, such as advanced in-service inspection and condition based maintenance, should be considered, not only to predict the consequences of ageing and guard against them, but also to monitor equipment performance throughout the lifetime of the plant and to help establish replacement schedules for critical systems, structures and components, and to better estimate the optimum end of the operating licence, which means the end of the nuclear power plant's lifetime. The importance of nuclear power plant life management in facilitating the technical and economic goals of long term operation is presented in this report in terms of the requirement to ensure safe long term supplies of electricity in the most economically competitive way. Safe and reliable operation is discussed in terms of the overall economic benefits when plant life management is implemented. Preconditions for plant life management for long term operation are identified and approaches are reviewed. Plant life management should not be associated only with the extension of the operational lifetime of the nuclear power plant, but with an owner's attitude and a rational approach of the operating company towards running the business economically and safely

  5. Crew resource management training adapted to nuclear power plant operators for enhancing safety attitude

    International Nuclear Information System (INIS)

    Ishibashi, Akira; Kitamura, Masaharu; Takahashi, Makoto

    2015-01-01

    A conventional training program for nuclear power plant operators mainly focuses on the improvement of knowledge and skills of individual operators. Although it has certainly contributed to safety operation of nuclear power plants, some recent incidents have indicated the necessity of an additional training program aiming at the improvement of team performance. In the aviation domain, crew resource management (CRM) training has demonstrated the effectiveness in resolving team management issues of flight crews, aircraft maintenance crews, and so on. In the present research, we attempt to introduce the CRM concept into operator training in nuclear power plant for the training of conceptual skill (that is, non-technical skill). In this paper an adapted CRM training for nuclear power plant operators is proposed. The proposed training method has been practically utilized in the training course of the managers of nuclear power plants. (author)

  6. Operating procedures for emergency situations in EDF PWR plants

    International Nuclear Information System (INIS)

    Depond, G.; Resse, L.

    1992-01-01

    Analysis of incidents and accidents occurring at French and foreign power plants - particularly the TMI accident - and the commissioning of many units in France, as well as tests on simulators, have all demonstrated that an improvement of safety in nuclear power units depends largely on the improvement of the man-machine interface and particularly of emergency operating procedures (EOP). EDF has taken numerous actions in this direction, especially since 1979. First of all, in improving the classical approach based on event-oriented procedures: Rewriting of initial accident operating procedures with regard to their technical contents their form, and the organization of the operating team (procedures I and A); Extension of initial procedures into areas at the limits of design basis and beyond the design basis limits (procedures H). Nevertheless, this approach is subject to several weaknesses. Dependence on a precise initial diagnosis, impossibility to take into account all the conceivable accidental situations, discrepancies between the predicted pattern and the reality. These drawbacks of the event approach have led us to revise the technical conception of the EOPs, and to develop a new approach based on a continuous monitoring of the physical states of the plant and the ability to define a relationship between the physical state of the plant and the operator actions. (author). 4 figs

  7. Environmental impact assessment of coal power plants in operation

    OpenAIRE

    Bartan Ayfer; Kucukali Serhat; Ar Irfan

    2017-01-01

    Coal power plants constitute an important component of the energy mix in many countries. However, coal power plants can cause several environmental risks such as: climate change and biodiversity loss. In this study, a tool has been proposed to calculate the environmental impact of a coal-fired thermal power plant in operation by using multi-criteria scoring and fuzzy logic method. We take into account the following environmental parameters in our tool: CO, SO2, NOx, particulate matter, fly as...

  8. Nuclear Power Plant Operator Reliability Research Based on Fuzzy Math

    Directory of Open Access Journals (Sweden)

    Fang Xiang

    2011-01-01

    Full Text Available This paper makes use of the concept and theory of fuzzy number in fuzzy mathematics, to research for the response time of operator in accident of Chinese nuclear power plant. Through the quantitative analysis for the performance shape factors (PSFs which influence the response time of operators, the formula of the operator response time is obtained based on the possibilistic fuzzy linear regression model which is used for the first time in this kind of research. The research result shows that the correct research method can be achieved through the analysis of the information from a small sample. This method breaks through the traditional research method and can be used not only for the reference to the safe operation of nuclear power plant, but also in other areas.

  9. Development and application of emergency operating procedures for nuclear power plants

    International Nuclear Information System (INIS)

    Lin Chengge

    1990-01-01

    The development and application of emergency operating procedures (EOPs) is an important measure to assure the operational safety for nuclear power plants. Event-oriented, symptom-, function- and state-oriented EOPs with their structures, interfaces, development procedures and practical application are described. The ideas and approach can be available for the preparation of EOPs for nuclear power plants which are going to be in service

  10. Operation of Finnish nuclear power plants. Quarterly report, 3rd quarter 1997

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1998-04-01

    Quarterly reports on the operation of Finnish nuclear power plants describe events and observations relating to nuclear and radiation safety that the Radiation and Nuclear Safety Authority of Finland (STUK) considers safety significant. Safety improvements at the plants are also described. The Report also includes a summary of the radiation safety of plant personnel and of the environment and tabulated data on the plants' production and load factors. The Finnish nuclear power plant units were in power operation in the third quarter of 1997, except for the annual maintenance outages of Loviisa plant units which lasted well over a month in all. There was also a brief interruption in electricity generation at Olkiluoto 1 for repairs and at Olkiluoto 2 due to a disturbance at the turbine plant. All plant units were in long-term test operation at upgraded reactor power level approved by STUK. The load factor average of all plant units was 87.6 %. One event in the third quarter was classified level 1 on the International Nuclear Event Scale (INES). It was noted at Loviisa 2 that one of four pressurized water tanks in the plant unit's emergency cooling system had been inoperable for a year. Other events in this quarter were INES level 0. Occupational doses and radioactive releases off-site were below authorized limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. (orig.)

  11. Condition monitoring and maintenance of nuclear power plant concrete structures

    International Nuclear Information System (INIS)

    Orr, R.; Prasad, N.

    1988-01-01

    Nuclear power plant concrete structures are potentially subject to deterioration due to several environmental conditions, including weather exposure, ground water exposure, and sustained high temperature and radiation levels. The nuclear power plant are generally licensed for a term of 40 years. In order to maximize the return from the existing plants, feasibility studies are in progress for continued operation of many of these plants beyond the original licensed life span. This paper describes a study that was performed with an objective to define appropriate condition monitoring and maintenance procedures. A timely implementation of a condition monitoring and maintenance program would provide a valuable database and would provide justification for extension of the plant's design life. The study included concrete structures such as the containment buildings, interior structures, basemats, intake structures and cooling towers. Age-related deterioration at several operating power plants was surveyed and the potential degradation mechanisms have been identified

  12. Steam generator assessment for sustainable power plant operation

    International Nuclear Information System (INIS)

    Drexler, Andreas; Fandrich, Joerg; Ramminger, Ute; Montaner-Garcia, Violeta

    2012-09-01

    Water and steam serve in the water-steam cycle as the energy transport and work media. These fluids shall not affect, through corrosion processes on the construction materials and their consequences, undisturbed plant operation. The main objectives of the steam water cycle chemistry consequently are: - The metal release rates of the structural materials shall be minimal - The probability of selective / localized forms of corrosion shall be minimal. - The deposition of corrosion products on heat transfer surfaces shall be minimized. - The formation of aggressive media, particularly local aggressive environments under deposits, shall be avoided. These objectives are especially important for the steam generators (SGs) because their condition is a key factor for plant performance, high plant availability, life time extension and is important to NPP safety. The major opponent to that is corrosion and fouling of the heating tubes. Effective ways of counteracting all degradation problems and thus of improving the SG performance are to keep SGs in clean conditions or if necessary to plan cleaning measures such as mechanical tube sheet lancing or chemical cleaning. Based on more than 40 years of experience in steam-water cycle water chemistry treatment AREVA developed an overall methodology assessing the steam generator cleanliness condition by evaluating all available operational and inspection data together. In order to gain a complete picture all relevant water chemistry data (e.g. corrosion product mass balances, impurity ingress), inspection data (e.g. visual inspections and tube sheet lancing results) and thermal performance data (e.g. heat transfer calculations) are evaluated, structured and indexed using the AREVA Fouling Index Tool Box. This Fouling Index Tool Box is more than a database or statistical approach for assessment of plant chemistry data. Furthermore the AREVA's approach combines manufacturer's experience with plant data and operates with an

  13. Operations Program Plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1990-09-01

    This document, Revision 4 of the Operations Program Plan, has been developed as the seven-year master plan for operating of the Waste Isolation Pilot Plant (WIPP). Subjects covered include public and technical communications; regulatory and environmental programs; startup engineering; radiation handling, surface operations, and underground operations; waste certification and waste handling; transportation development; geotechnical engineering; experimental operations; engineering program; general maintenance; security program; safety, radiation, and regulatory assurance; quality assurance program; training program; administration activities; management systems program; and decommissioning. 243 refs., 19 figs., 25 tabs. (SM)

  14. Principles and objectives for the operation and support of standard nuclear plants

    International Nuclear Information System (INIS)

    1994-08-01

    This publication provides the guiding principles and objectives for the operation and support of standard nuclear plants. They are the basis for designing the processes to operate and support the new plants and to estimate the staffing options. INPO has facilitated and coordinated the development of these principles and objectives under the industry's Strategic Plan for Building New Nuclear Power Plants. The industry's plan, first published in 1990, designates INPO as the lead in achieving the following goals: 1. Establish an institutional framework and approach to implement and maintain a model for life-cycle standardization of a family of plants. 2. Develop standardization objectives and selected standardized function and process descriptions to provide a basis for uniformity in appropriate aspects of the organizational structure; administrative controls; and construction, startup, operating, and maintenance practices. 3. Develop an approach to maintain the standard design and design intent as well as standardized operational approaches in all units within a family of plants over their lifetimes. This document supports these goals. Twelve guiding principles are followed by descriptions of four functions, and after that eight processes with their associated objectives

  15. Operating experience review for nuclear power plants in the Systematic Evaluation Program

    International Nuclear Information System (INIS)

    Mays, G.T.; Harrington, K.H.

    1982-01-01

    The Systematic Evaluation Program Branch (SEPB) of the Nuclear Regulatory Commission (NRC) is conducting the Systematic Evaluation Program (SEP) whose purpose is to determine the safety margins of the design and operation of the eleven oldest operating commercial nuclear power plants in the United States. This paper describes the methodology and results of the operational experience review portion of the SEP evaluation. SEPB will combine the results from these operational reviews with other safety topic evaluations to perform an integrated assessment of the SEP plants

  16. Human factors in nuclear power plant operation

    International Nuclear Information System (INIS)

    Sabri, Z.A.; Husseiny, A.A.

    1980-01-01

    An extensive effort is being devoted to developing a comprehensive human factor program that encompasses establishment of a data base for human error prediction using past operation experience in commercial nuclear power plants. Some of the main results of such an effort are reported including data retrieval and classification systems which have been developed to assist in estimation of operator error rates. Also, statistical methods are developed to relate operator error data to reactor type, age, and specific technical design features. Results reported in this paper are based on an analysis of LER's covering a six-year period for LWR's. Developments presently include a computer data management program, statistical model, and detailed error taxonomy

  17. Error analysis of nuclear power plant operator cognitive behavior

    International Nuclear Information System (INIS)

    He Xuhong; Zhao Bingquan; Chen Yulong

    2001-01-01

    Nuclear power plant is a complex human-machine system integrated with many advanced machines, electron devices and automatic controls. It demands operators to have high cognitive ability and correct analysis skill. The author divides operator's cognitive process into five stages to analysis. With this cognitive model, operator's cognitive error is analysed to get the root causes and stages that error happens. The results of the analysis serve as a basis in design of control rooms and training and evaluation of operators

  18. Operation of Finnish nuclear power plants. Quarterly report, 2nd quarter 1996

    International Nuclear Information System (INIS)

    Sillanpaeae, T.

    1996-11-01

    Quarterly Reports on the operation of Finnish nuclear power plants describe events and observations relating to nuclear and radiation safety which the Finnish Centre for Radiation and Nuclear Safety (STUK) considers safety significant. Safety improvements at the plants are also described. The report also includes a summary of the radiation safety of plant personnel and of the environment and tabulated data on the plants' production and load factors. In the second quarter of 1996, the Finnish nuclear power plant units were in power operation except for the annual maintenance outages of TVO plant units and the Midsummer shutdown at TVO II which was due to low electricity demand, a turbine generator inspection and repairs. The load factor average of all plant units was 88.9 %. Events in the second quarter of 1996 were classified level 0 on the International Nuclear Event Scale (INES)

  19. Enhanced design, operation and maintenance practices for a longer plant service life

    International Nuclear Information System (INIS)

    Raimondo, E.; Courcoux, A.

    2004-01-01

    Plant service life problems have been under detailed investigation in France and the experience acquired by our company over the past 25 years in the design, construction and maintenance of Pressurized Water Reactors has contributed to develop skills, equipment and capabilities available for efficient plant aging management and component service life extension. The service life of a nuclear power plant is deeply dependant of the provisions made during the design stage, directly linked to good operating conditions and adequate maintenance practices. This paper presents the importance of these three steps (design, operation and maintenance) for plant service life concern. (author)

  20. Maximal Bell's inequality violation for non-maximal entanglement

    International Nuclear Information System (INIS)

    Kobayashi, M.; Khanna, F.; Mann, A.; Revzen, M.; Santana, A.

    2004-01-01

    Bell's inequality violation (BIQV) for correlations of polarization is studied for a product state of two two-mode squeezed vacuum (TMSV) states. The violation allowed is shown to attain its maximal limit for all values of the squeezing parameter, ζ. We show via an explicit example that a state whose entanglement is not maximal allow maximal BIQV. The Wigner function of the state is non-negative and the average value of either polarization is nil

  1. Mathematics for Water and Wastewater Treatment Plant Operators. Water and Wastewater Training Program.

    Science.gov (United States)

    South Dakota Dept. of Environmental Protection, Pierre.

    This booklet is intended to aid the prospective waste treatment plant operator or drinking water plant operator in learning to solve mathematical problems, which is necessary for Class I certification. It deals with the basic mathematics which a Class I operator may require in accomplishing day-to-day tasks. The book also progresses into problems…

  2. Use of plant operating history to define transient loads

    International Nuclear Information System (INIS)

    Dwivedy, K.K.

    1996-01-01

    Fatigue and crack growth analyses of components subjected to transient loads have been under continuous development during the recent past to include effects of environment on the components. The accuracy of the evaluation method on the predicted reliability of the components in the operating environment has become a focus of attention. Methods have integrated available material/component test data to improve evaluation techniques. However, in the area of definition of thermal transient loads the analyst still has to remain conservative, because no realistic guidelines have been developed to define thermal transients and their sequences. Fatigue re-evaluations of components are becoming increasingly necessary in operating plants as they age due to two reasons: (1) Components show age related degradation and cannot be repaired/replaced due to economic/logistic reasons. (2) Components experience transient conditions which were not considered in the original design. In either case, the evaluation of remaining life of components involves definition of transients and their sequence from the time the component was put in service until the end of life. As a common practice, initial plant design transients are used in a conservative definition of sequences to obtain results unrealistic for the situation, which sometimes leads to inaccurate estimate of the remaining life of components. The objective of this paper is to use plant operating history and plant monitoring data to provide procedures and techniques to define realistic transients for evaluation

  3. Feedback of operation and maintenance experience into evolutionary plant design (HWRs)

    International Nuclear Information System (INIS)

    Hedges, K.R.; Sanatkumar, A.; Kwon, Oh-Cheol

    1999-01-01

    The process of feeding back operation and maintenance information into the CANDU plant design process has been in constant evolution since the beginning of the CANDU program. The commissioning and operation experience from the first commercial reactors at Pickering A and Bruce A was used extensively in the design of the first generation CANDU 6 Plants. These units have been in operation for 15 years, producing electricity at an average lifetime capacity factor of about 85%. In further advancing the CANDU 6 and 9 design, greater emphasis is placed on enhancements that can reduce operational costs and further improve plant performance by reducing the planned outage time. The plant design has been improved to facilitate maintenance scheduling, equipment isolation, maintenance and post maintenance testing. Individual tasks have been analyzed as well as the interaction between tasks during outages to reduce the down time required and simplify the execution of the work. This results in shorter outages, reduced radioactive dose and reduced costs. The Utilities have continued to play an important role in CANDU 6 Evolution. Specifically; the Korea Utility KEPCO has one of the original four CANDU 6 Plants and three of the most modem. Their feedback to the designers has been very helpful. One of the most important feedback processes is through the CANDU Owners Group, which provides information exchange between members. In India eight PHWRs of 220 MWe capacity are in operation. Four reactors, also of 220 MWe capacity are in advanced stages of construction. Site construction work of two units of 500 MWe PHWRs at Tarapur will be taken up shortly. Over the years, during construction and operation of these power stations, a large amount of experience has been accumulated. Operation and maintenance experience is shared with operating stations by intensive participation of design engineers in Station Operation Review meetings, trouble shooting and root cause analysis of problems

  4. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1990-08-01

    During the first quarter of 1990 the Finnish nuclear power plant units Loviisa 1 and 2 and TVO I and II were in commercial operation for most of the time. Nuclear electricity accounted for 32.5% of the total Finnish electricity production during this quarter. The load factor average of the nuclear power plant units was 99.0%. An international nuclear event scale has been introduced for the classification of nuclear power plant events according to their nuclear and radiation safety significance. The scale first undergoes about a year long trial period in several countries. on the scale, events are divided into levels from 1 to 7 of which events at Level 7 are the most serious. Furthermore, Level 0 (Below Scale) is used for events with no safety significance. All events which occurred at the Finnish nuclear power plants this quarter are classified as Level 0. Occupational radiation doses and external releases of radioactivity were considerably below authorised limits. At the Loviisa plant, a back-up emergency feedwater system independent of the plant's other systems has been introduced which offers a new, alternative means of removing residual heat from the reactor. Owing to this system, the risk of a severe accident has been further reduced. At the TVO plants, systems have been introduced by which accident sequences which lead to containment failure could be eliminated and the consequences of a potential severe accident could be mitigated. In this report, also the release of short-lived radioactive materials along the transfer route of an irradiated sample is described which occured at the FiR 1 research reactor. The amounts of radioactive materials individuals received in their bodies in connection with this event were very low

  5. Development and validation process of the advanced main control board for next Japanese PWR plants

    International Nuclear Information System (INIS)

    Tani, M.; Ito, K.; Yokoyama, M.; Imase, M.; Okamoto, H.

    2000-01-01

    The purpose of main control room improvement is to reduce operator workload and potential human errors by offering a better working environment where operators can maximize their abilities. Japanese pressurized water reactor (PWR) utilities and Mitsubishi group have developed a touch -screen-based main control console (i.e. advanced main control room) the next generation PWRs to further improve the plant operability using a state of the art electronics technology. The advanced main control room consists of an operator console, a supervisor console and large display panels. The functional specifications were evaluated by utility operators using a prototype main control console connected to a plant simulator. (author)

  6. Five years of partnership programme between German and East European nuclear power plant operators

    International Nuclear Information System (INIS)

    Kraemer, P.

    1995-01-01

    In a jointly adopted communique in August 1992 the regulations governing the partnerships were laid down. The following principles are given priority: bilateral exchange of operating experience on the basis of equal partnership; the knowledge gained from the exchange of experience is used to improve the operation and safety of the respective partner plant; the partnership programme is free from commercial interests and does not include transfer of funds. Since the establishment of the first partnership relations (Biblis) with an east european nuclear power plant (Balakowo) late in April 1990, a total of 126 reciprocal visits was paid, 82 of which to German nuclear power plants. The balance of the efforts made by German nuclear power plant operators to integrate east european nuclear plant operators can be considered positive. (orig./HP) [de

  7. Nuclear power plant life management and longer-term operation

    International Nuclear Information System (INIS)

    2006-01-01

    This book, prepared by NEA member country experts, contains data and analyses relevant to nuclear power plant life management and the plants' extended, longer-term operation (LTO). It addresses technical, economic and environmental aspects and provides insights into the benefits and challenges of plant life management and LTO. It will be of interest to policy makers and senior managers in the nuclear power sector and governmental bodies involved in nuclear power programme design and management. The data and information on current trends in nuclear power plant life management will be useful to researchers and analysts working in the field of nuclear energy system assessment. (authors)

  8. Developments in safety and operations culture in BNFL's thorp reprocessing plant, Sellafield, Cumbria

    International Nuclear Information System (INIS)

    Kett, P.J.

    2000-01-01

    One of the best descriptions of Culture is 'how we do things around here'. In a stable organisation it is extremely difficult to change any type of culture, whether it is an operations, customer service or safety culture. To change culture one of two elements are essential. There must be either a significant external pressure felt by all in the organisation or a change in senior management, with authority to set a new direction for the organisation. BNFL had a unique opportunity through the commissioning and operation of the Thorp Reprocessing Plant at Sellafield to shape a new Safety and Operations Culture. Both the key elements for change were present. Thorp was a high profile flagship plant that had attracted multinational investment. It incorporated new technology. The workforce had volunteered to operate the plant. A strong senior management team was specially selected. The plant was being commissioned in an environment where there was significant opposition by 'anti nuclear' groups. It was essential to both BNFL and the wider international nuclear community that Thorp was commissioned and operated safely. A strong operating culture was developed with safety as the corner stone. The culture comprises three key components. Rigorous plant safety case and risk assessments before work commences and modifications to the plant occur; A high level of involvement by all levels of the workforce in both operations and safety matters; Strong supportive leadership which does not allow safety standards to be compromised and encourages open debate on how to improve. During commissioning and early operation of Thorp the robustness of the Safety and Operations Culture was demonstrated. On several occasions, despite intense commercial pressure, operations were halted until the situation was resolved both technically and procedurally. This paper describes how the Safety and Operations Culture was developed. The key factors for success include recruitment, team selection

  9. Chemical mode control in nuclear power plant decommissioning during operation of technologies in individual radioactive waste processing plants

    International Nuclear Information System (INIS)

    Horvath, J.; Dugovic, L.

    1999-01-01

    Sewage treatment of nuclear power plant decommissioning is performed by system of sewage concentration in evaporator with formation of condensed rest, it means radioactive waste concentrate and breeding steam. During sewage treatment plant operation department of chemical mode performs chemical and radiochemical analysis of sewage set for treatment, chemical and radiochemical analysis of breeding steam condensate which is after final cleaning on ionization filter and fulfilling the limiting conditions released to environment; chemical and radiochemical analysis of heating steam condensate which is also after fulfilling the limiting conditions released to environment. Condensed radioactive concentrate is stored in stainless tanks and later converted into easy transportable and chemically stable matrix from the long term storage point of view in republic storage Mochovce. The article also refer to bituminous plant, vitrification plant, swimming pool decontamination plant of long term storage and operation of waste processing plant Bohunice

  10. Procedure for estimating nonfuel operation and maintenance costs for large steam-electric power plants

    International Nuclear Information System (INIS)

    Myers, M.L.; Fuller, L.C.

    1979-01-01

    Revised guidelines are presented for estimating annual nonfuel operation and maintenance costs for large steam-electric power plants, specifically light-water-reactor plants and coal-fired plants. Previous guidelines were published in October 1975 in ERDA 76-37, a Procedure for Estimating Nonfuel Operating and Maintenance Costs for Large Steam-Electric Power Plants. Estimates for coal-fired plants include the option of limestone slurry scrubbing for flue gas desulfurization. A computer program, OMCOST, is also presented which covers all plant options

  11. Computerized operation manual (COM) of nuclear power plants

    International Nuclear Information System (INIS)

    Szegi, Z.

    1985-01-01

    This paper is to be presented at the International Seminar on Diagnoses of and Response to Abnormal Occurrences at Nuclear Power Plants organized by the International Atomic Energy Agency. The topic of presentation is the Computerized Operational Manual. This system supports the operator at disturbance situations by displaying quickly and unambiguously the operational instructions and the relevant information without mistakes. By the computerized manual the operator can determine the instruction-subsystem which reflects the real state of the power unit. From this point the system guides the operator on how to drive the unit to another determined state by providing the operational instructions at any time. A data bank is also included which contains information concerning rules restricting on maintenance and repair. The system will be realized at Paks NPP. (author)

  12. The Operator's Diagnosis Task under Abnormal Operating Conditions in Industrial Process Plant

    DEFF Research Database (Denmark)

    Goodstein, L.P.; Pedersen, O.M.; Rasmussen, Jens

    1974-01-01

    Analysis of serious accidents in connection with the operation of technical installations demonstrate that the diagnosis task which confronts personnel under non-normal plant conditions is a critical one. This report presents a preliminary outline of characteristic traits connected with the task...... of diagnosis for use in discussions of (a) the studies which are necessary in order to formulate the operator's diagnostic procedures and (b) the possibilities which exists for supporting these procedures through appropriate data processing and display in the control system. At the same time, attempts are made...

  13. Improving CANDU plant operation and maintenance through retrofit information technology systems

    International Nuclear Information System (INIS)

    Lupton, L. R.; Judd, R. A.

    1998-01-01

    CANDU plant owners are facing an increasingly competitive environment for the generation of electricity. To meet this challenge, all owners have identified that information technology offers opportunities for significant improvements in CANDU operation, maintenance and administration (OM and A) costs. Targeted information technology application areas include instrumentation and control, engineering, construction, operations and plant information management. These opportunities also pose challenges and issues that must be addressed if the full benefits of the advances in information technology are to be achieved. Key among these are system hardware and software maintenance, and obsolescence protection. AECL has been supporting CANDU stations with the initial development and evaluation of systems to improve plant performance and cost. Five key initiatives that have been implemented or are in the process of being implemented in some CANDU plants to achieve cooperational benefits include: critical safety parameter monitor system; advanced computerized annunciation system; plant historical data system; plant display system; and digital protection system. Each system will be described in terms of its role in enhancing current CANDU plant performance and how they will contribute to future CANDU plant performance. (author). 8 refs., 3 figs

  14. Seismic-load-induced human errors and countermeasures using computer graphics in plant-operator communication

    International Nuclear Information System (INIS)

    Hara, Fumio

    1988-01-01

    This paper remarks the importance of seismic load-induced human errors in plant operation by delineating the characteristics of the task performance of human beings under seismic loads. It focuses on man-machine communication via multidimensional data like that conventionally displayed on large panels in a plant control room. It demonstrates a countermeasure to human errors using a computer graphics technique that conveys the global state of the plant operation to operators through cartoon-like, colored graphs in the form of faces that, with different facial expressions, show the plant safety status. (orig.)

  15. Treatment of operational experience of nuclear power plants in WANO

    International Nuclear Information System (INIS)

    Ibanez, M.

    2013-01-01

    The article describes the activities associated to the Operating Experience Programme of the World Association of Nuclear Operators. The programme manages the event reports submitted by the nuclear power plants to the WANO database for the preparation by the Operating Experience Central Team of some documents like the significant Operating Experience Reports and Significant Event Reports that help the stations to avoid similar events. (Author)

  16. Operation of Finnish nuclear power plants. Quarterly report 3rd, quarter 1995

    International Nuclear Information System (INIS)

    Sillanpaeae, T.

    1996-05-01

    Quarterly Reports on the operation of Finnish nuclear power plants describe events and observations relating to nuclear and radiation safety which the Finnish Centre for Radiation and Nuclear Safety (STUK) considers safety significant. Safety improvements at the plants are also described. The Report includes a summary of the radiation safety of plant personnel and of the environment and tabulated data on the plants' production and load factors. Except for the annual maintenance outages of Loviisa plant units and for TVO II's brief outage to repair a failed component, Finnish nuclear power plant units were in power operation in the third quarter of 1995. The load factor average of all plant units was 90.4 %. Events in this quarter were level 0 on the INES scale. Occupational doses and radioactive releases off-site were below authorised limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. (orig.) (4 figs., 4 tabs.)

  17. Operation of Finnish nuclear power plants. Quarterly report 3rd, quarter 1995

    Energy Technology Data Exchange (ETDEWEB)

    Sillanpaeae, T [ed.

    1996-05-01

    Quarterly Reports on the operation of Finnish nuclear power plants describe events and observations relating to nuclear and radiation safety which the Finnish Centre for Radiation and Nuclear Safety (STUK) considers safety significant. Safety improvements at the plants are also described. The Report includes a summary of the radiation safety of plant personnel and of the environment and tabulated data on the plants` production and load factors. Except for the annual maintenance outages of Loviisa plant units and for TVO II`s brief outage to repair a failed component, Finnish nuclear power plant units were in power operation in the third quarter of 1995. The load factor average of all plant units was 90.4 %. Events in this quarter were level 0 on the INES scale. Occupational doses and radioactive releases off-site were below authorised limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. (orig.) (4 figs., 4 tabs.).

  18. The new operating conditions of French nuclear power plants

    International Nuclear Information System (INIS)

    Leclercq, J.

    1986-01-01

    Six themes are examined: France's unique position in view of the size of its nuclear operating plant, the role of nuclear power in matching electricity supply to demand, the excellent flexibility provided by PWR facilities in operation, the approaches used in the field of automatic operational control systems, the systematic use of data processing for maintenance and generation and the gains in productivity that can be gained as a result of improving fuel use [fr

  19. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1991-12-01

    The Finnish nuclear power plant units Loviisa 1 and 2 as well as TVO 1 and II were in operation for almost the whole second quarter of 1991. The load factor average was 87.4 %. In consequence of a fire, which broke out in the switchgear building, connections to both external grids were lost and TVO II relied on power supplied by four back-up diesels for 7.5 hrs. The event is classified as Level 2 on the International Nuclear Event Scale. The process of examining the non-leaking fuel bundles removed from the Loviisa nuclear reactors has continued. The examinations have revealed, so far, that the uppermost spacing lattices of the bundles exhibit deformations similar to those detected in the leaking fuel bundles removed from the reactors. This event is classified as Level 1 on the International Nuclear Event Scale. Other events in this quarter which are classified according to the International Nuclear Event Scale are Level Zero (Below Scale) on the Scale. The Finnish Centre for Radiation and Nuclear Safety has assessed the safety of the Loviisa and Olkiluoto nuclear power plants based on the new regulations issued on 14.2.1991 by the Council of State. The safety regulations are much more stringent than those in force when the Loviisa and Olkiluoto nuclear power plants were built. The assessment indicated that the TVO nuclear power plant meets these safety regulations. The Loviisa nuclear power plant meets the requirements with the exception of certain requirements related to the ensuring of safety functions and provision for accidents. At the Loviisa nuclear power plant there are several projects under consideration to enhance safety

  20. Application of digital solutions to help the safe and efficient operation of nuclear power plants

    International Nuclear Information System (INIS)

    Ortega P, F.; Fernandez F, S.

    2017-09-01

    In the search for excellence, the emergence of solutions to digitize nuclear power plants is an opportunity to optimize the operation and safety of them. The new technologies available today in the market, applied under a global vision of the operation, can contribute to the excellent operation of nuclear power plants in terms of efficiency and effectiveness. Tecnatom has a long experience in various areas related to the operation of the plants, giving the aforementioned global vision, essential to develop global solutions that pursue the safe and efficient operation of the operation. (Author)

  1. Nuclear power plant control room operator control and monitoring tasks

    International Nuclear Information System (INIS)

    Bovell, C.R.; Beck, M.G.; Carter, R.J.

    1998-01-01

    Oak Ridge National Laboratory is conducting a research project the purpose of which is to develop the technical bases for regulatory review criteria for use in evaluating the safety implications of human factors associated with the use of artificial intelligence and expert systems, and with advanced instrumentation and control (I and C) systems in nuclear power plants (NPP). This report documents the results from Task 8 of that project. The primary objectives of the task was to identify the scope and type of control and monitoring tasks now performed by control-room operators. Another purpose was to address the types of controls and safety systems needed to operate the nuclear plant. The final objective of Task 8 was to identify and categorize the type of information and displays/indicators required to monitor the performance of the control and safety systems. This report also discusses state-of-the-art controls and advanced display devices which will be available for use in control-room retrofits and in control room of future plants. The fundamental types of control and monitoring tasks currently conducted by operators can be divided into four classifications: function monitoring tasks, control manipulation tasks, fault diagnostic tasks, and administrative tasks. There are three general types of controls used in today's NPPs, switches, pushbuttons, and analog controllers. Plant I and C systems include components to achieve a number of safety-related functions: measuring critical plant parameters, controlling critical plant parameters within safety limits, and automatically actuating protective devices if safe limits are exceeded. The types of information monitored by the control-room operators consist of the following parameters: pressure, fluid flow and level, neutron flux, temperature, component status, water chemistry, electrical, and process and area radiation. The basic types of monitoring devices common to nearly all NPP control rooms include: analog meters

  2. Guidebook on design, construction and operation of pilot plants for uranium ore processing

    International Nuclear Information System (INIS)

    1990-01-01

    The design, construction and operation of a pilot plant are often important stages in the development of a project for the production of uranium concentrates. Since building and operating a pilot plant is very costly and may not always be required, it is important that such a plant be built only after several prerequisites have been met. The main purpose of this guidebook is to discuss the objectives of a pilot plant and its proper role in the overall project. Given the wide range of conditions under which a pilot plant may be designed and operated, it is not possible to provide specific details. Instead, this book discusses the rationale for a pilot plant and provides guidelines with suggested solutions for a variety of problems that may be encountered. This guidebook is part of a series of Technical Reports on uranium ore processing being prepared by the IAEA's Division of Nuclear Fuel Cycle and Waste Management. 42 refs, 7 figs, 3 tabs

  3. First Insights into the Large Genome of Epimedium sagittatum (Sieb. et Zucc Maxim, a Chinese Traditional Medicinal Plant

    Directory of Open Access Journals (Sweden)

    Gong Xiao

    2013-06-01

    Full Text Available Epimedium sagittatum (Sieb. et Zucc Maxim is a member of the Berberidaceae family of basal eudicot plants, widely distributed and used as a traditional medicinal plant in China for therapeutic effects on many diseases with a long history. Recent data shows that E. sagittatum has a relatively large genome, with a haploid genome size of ~4496 Mbp, divided into a small number of only 12 diploid chromosomes (2n = 2x = 12. However, little is known about Epimedium genome structure and composition. Here we present the analysis of 691 kb of high-quality genomic sequence derived from 672 randomly selected plasmid clones of E. sagittatum genomic DNA, representing ~0.0154% of the genome. The sampled sequences comprised at least 78.41% repetitive DNA elements and 2.51% confirmed annotated gene sequences, with a total GC% content of 39%. Retrotransposons represented the major class of transposable element (TE repeats identified (65.37% of all TE repeats, particularly LTR (Long Terminal Repeat retrotransposons (52.27% of all TE repeats. Chromosome analysis and Fluorescence in situ Hybridization of Gypsy-Ty3 retrotransposons were performed to survey the E. sagittatum genome at the cytological level. Our data provide the first insights into the composition and structure of the E. sagittatum genome, and will facilitate the functional genomic analysis of this valuable medicinal plant.

  4. First Insights into the Large Genome of Epimedium sagittatum (Sieb. et Zucc) Maxim, a Chinese Traditional Medicinal Plant

    Science.gov (United States)

    Liu, Di; Zeng, Shao-Hua; Chen, Jian-Jun; Zhang, Yan-Jun; Xiao, Gong; Zhu, Lin-Yao; Wang, Ying

    2013-01-01

    Epimedium sagittatum (Sieb. et Zucc) Maxim is a member of the Berberidaceae family of basal eudicot plants, widely distributed and used as a traditional medicinal plant in China for therapeutic effects on many diseases with a long history. Recent data shows that E. sagittatum has a relatively large genome, with a haploid genome size of ~4496 Mbp, divided into a small number of only 12 diploid chromosomes (2n = 2x = 12). However, little is known about Epimedium genome structure and composition. Here we present the analysis of 691 kb of high-quality genomic sequence derived from 672 randomly selected plasmid clones of E. sagittatum genomic DNA, representing ~0.0154% of the genome. The sampled sequences comprised at least 78.41% repetitive DNA elements and 2.51% confirmed annotated gene sequences, with a total GC% content of 39%. Retrotransposons represented the major class of transposable element (TE) repeats identified (65.37% of all TE repeats), particularly LTR (Long Terminal Repeat) retrotransposons (52.27% of all TE repeats). Chromosome analysis and Fluorescence in situ Hybridization of Gypsy-Ty3 retrotransposons were performed to survey the E. sagittatum genome at the cytological level. Our data provide the first insights into the composition and structure of the E. sagittatum genome, and will facilitate the functional genomic analysis of this valuable medicinal plant. PMID:23807511

  5. 7 CFR 70.110 - Requirements for sanitation, facilities, and operating procedures in official plants.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Requirements for sanitation, facilities, and operating... Requirements for sanitation, facilities, and operating procedures in official plants. (a) The requirements for sanitation, facilities, and operating procedures in official plants shall be the applicable provisions stated...

  6. Maximizing and customer loyalty: Are maximizers less loyal?

    Directory of Open Access Journals (Sweden)

    Linda Lai

    2011-06-01

    Full Text Available Despite their efforts to choose the best of all available solutions, maximizers seem to be more inclined than satisficers to regret their choices and to experience post-decisional dissonance. Maximizers may therefore be expected to change their decisions more frequently and hence exhibit lower customer loyalty to providers of products and services compared to satisficers. Findings from the study reported here (N = 1978 support this prediction. Maximizers reported significantly higher intentions to switch to another service provider (television provider than satisficers. Maximizers' intentions to switch appear to be intensified and mediated by higher proneness to regret, increased desire to discuss relevant choices with others, higher levels of perceived knowledge of alternatives, and higher ego involvement in the end product, compared to satisficers. Opportunities for future research are suggested.

  7. Safety of Nuclear Power Plants: Commissioning and Operation. Specific Safety Requirements

    International Nuclear Information System (INIS)

    2016-01-01

    This publication describes the requirements to be met to ensure the safe operation of nuclear power plants. It takes into account developments in areas such as long term operation of nuclear power plants, plant ageing, periodic safety review, probabilistic safety analysis and risk informed decision making processes. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the IAEA Safety Standards Series No. SF-1, Fundamental Safety Principles. A review of Safety Requirements publications was commenced in 2011 following the accident in the Fukushima Daiichi nuclear power plant in Japan. The review revealed no significant areas of weakness and resulted in just a small set of amendments to strengthen the requirements and facilitate their implementation, which are contained in the present publication

  8. PV-Plants in autarky or network coupled operation: technical and economic comparison accordingly to practical investigations

    International Nuclear Information System (INIS)

    Ajib, Salman; Seitz, Thomas; Petzold, Reinhardt

    2006-01-01

    PV-Plants can be operated, as known, using autarky or network coupled operation modes, The first operation mode is recommended in the places which locate away from the electrical supply network. However the PV-plants, when using network coupled mode, can be used in all of the places, where the sunlight is suitable and there is a sufficient place to establish these plants in the required size. The differences between the two operation modes are the additional components and the dimensioning of the PV-plants. The whole needed electrical energy must be obtained from the PV-plants, when the autarky operation mode is used. In contrast to this, this energy can be provided by the PV-plants or by the electrical supply network when the network coupled operation mode is used, therefore a network coupled PV-plants need a careful initial planning and installation. In this paper the function principles and the components of these PV-plants in the two operation modes will be presented. In addition to this, the results obtained from the investigation of PV-plants while working with nominal power of P= 1 kW p will be analyzed and discussed too. After that the dimensioning steps and the economic evaluation will be depicted.(Author)

  9. Installation and commissioning of operation nuclear power plant reactor protection system modernization project

    International Nuclear Information System (INIS)

    Lu Weiwei

    2010-01-01

    Qinshan Nuclear Power Plant is the first nuclear power plant in mainland China; it is also the first one which realizes the modernization of analog technology based Reactor Protection System in the operation nuclear power plant of China. The implementation schedule is the shortest one which use same digital technology platform (TELEPERM XS of AREVA NP) to modifying the safety class I and C system in the world, the whole project spent 28 months from equipment contract signed to putting system into operation. It open up a era for operation nuclear power plant using mature digital technology to make safety class I and C system modernization in China. The important practical significance of this successful project is very obvious. This article focus on two important project stage--equipment installation and system commissioning, it is based on a large number of engineering implementation fact, it covers the problems and solutions happened during the installation and commission. The purpose of the article is to share the experience and lessons of safety I and C system modernization for other operation nuclear power plant. (authors)

  10. Method of operation for a nuclear power plant

    International Nuclear Information System (INIS)

    Barleon, L.; Dalle Donne, M.; Dorner, S.

    1976-01-01

    A method for the operation of a nuclear power plant is described whose primary coolant circuit contains liquid metal as coolant, and for whose secondary circuit which is coupled to the first by means of heat exchangers, one or more chemical compositions dissociating at higher temperatures and recombining at lower temperatures or associating into the original types are used as operating medium. N 2 O 4 is suggested as operating medium, and metal halogenides e.g. Al 2 Cl 6 , Al 2 Br 6 are also cited as suitable. Corrosion dangers are regarded as low. (UWI) [de

  11. A Chronological Reliability Model to Assess Operating Reserve Allocation to Wind Power Plants: Preprint

    International Nuclear Information System (INIS)

    Milligan, M. R.

    2001-01-01

    As the use of wind power plants increases worldwide, it is important to understand the effect these power sources have on the operations of the grid. This paper focuses on the operating reserve impact of wind power plants. Many probabilistic methods have been applied to power system analysis, and some of these are the basis of reliability analysis. This paper builds on a probabilistic technique to allocate the operating reserve burden among power plants in the grid. The method was originally posed by Strbac and Kirschen[1] and uses an allocation that prorates the reserve burden based on expected energy not delivered. Extending this method to include wind power plants allows the reserve burden to be allocated among different plants using the same method, yet incorporates information about the intermittent nature of wind power plants

  12. Technical data for concentrated solar power plants in operation, under construction and in project

    Directory of Open Access Journals (Sweden)

    Ugo Pelay

    2017-08-01

    Full Text Available This article presents technical data for concentrated solar power (CSP plants in operation, under construction and in project all over the world in the form of tables. These tables provide information about plants (e.g., name of the CSP plant, country of construction, owner of the plant, aim of the plant and their technical characteristics (e.g., CSP technology, solar power, area of the plant, presence and type of hybridization system, electricity cost, presence and type of TES, power cycle fluid, heat transfer fluid, operating temperature, operating pressure, type of turbine, type and duration of storage, etc.. Further interpretation of the data and discussions on the current state-of-the-art and future trends of CSP can be found in the associated research article (Pelay et al., 2017 [1].

  13. Haddam Neck Plant. Annual operating report, 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Gross electrical power generated was 2,464,308 MWh(e) with the reactor on line 4,417 hrs. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, primary coolant chemistry, occupational radiation exposure, release of radioactive materials, reportable occurrences, changes in plant, technical specifications, core vi start-up, containment leak testing, and core v and vi refueling

  14. A diagnosis system for plant operation support

    International Nuclear Information System (INIS)

    Sundheimer, S.; Lorenzetti, J.; Lamana, C.

    1990-01-01

    The present article describes a diagnosis system for abnormal power plant events. The design is modular and uses a shell written in C languaje and a knowledge basis that can be changed easily. At present the system works with a reduced knowledge for primary and secondery leacks. The mitigation procedure is being written with the help of operation staff

  15. Environmental impact assessment of coal power plants in operation

    Directory of Open Access Journals (Sweden)

    Bartan Ayfer

    2017-01-01

    Full Text Available Coal power plants constitute an important component of the energy mix in many countries. However, coal power plants can cause several environmental risks such as: climate change and biodiversity loss. In this study, a tool has been proposed to calculate the environmental impact of a coal-fired thermal power plant in operation by using multi-criteria scoring and fuzzy logic method. We take into account the following environmental parameters in our tool: CO, SO2, NOx, particulate matter, fly ash, bottom ash, the cooling water intake impact on aquatic biota, and the thermal pollution. In the proposed tool, the boundaries of the fuzzy logic membership functions were established taking into account the threshold values of the environmental parameters which were defined in the environmental legislation. Scoring of these environmental parameters were done with the statistical analysis of the environmental monitoring data of the power plant and by using the documented evidences that were obtained during the site visits. The proposed method estimates each environmental impact factor level separately and then aggregates them by calculating the Environmental Impact Score (EIS. The proposed method uses environmental monitoring data and documented evidence instead of using simulation models. The proposed method has been applied to the 4 coal-fired power plants that have been operation in Turkey. The Environmental Impact Score was obtained for each power plant and their environmental performances were compared. It is expected that those environmental impact assessments will contribute to the decision-making process for environmental investments to those plants. The main advantage of the proposed method is its flexibility and ease of use.

  16. Environmental impact assessment of coal power plants in operation

    Science.gov (United States)

    Bartan, Ayfer; Kucukali, Serhat; Ar, Irfan

    2017-11-01

    Coal power plants constitute an important component of the energy mix in many countries. However, coal power plants can cause several environmental risks such as: climate change and biodiversity loss. In this study, a tool has been proposed to calculate the environmental impact of a coal-fired thermal power plant in operation by using multi-criteria scoring and fuzzy logic method. We take into account the following environmental parameters in our tool: CO, SO2, NOx, particulate matter, fly ash, bottom ash, the cooling water intake impact on aquatic biota, and the thermal pollution. In the proposed tool, the boundaries of the fuzzy logic membership functions were established taking into account the threshold values of the environmental parameters which were defined in the environmental legislation. Scoring of these environmental parameters were done with the statistical analysis of the environmental monitoring data of the power plant and by using the documented evidences that were obtained during the site visits. The proposed method estimates each environmental impact factor level separately and then aggregates them by calculating the Environmental Impact Score (EIS). The proposed method uses environmental monitoring data and documented evidence instead of using simulation models. The proposed method has been applied to the 4 coal-fired power plants that have been operation in Turkey. The Environmental Impact Score was obtained for each power plant and their environmental performances were compared. It is expected that those environmental impact assessments will contribute to the decision-making process for environmental investments to those plants. The main advantage of the proposed method is its flexibility and ease of use.

  17. Operational safety performance and economical efficiency evaluation for nuclear power plants

    International Nuclear Information System (INIS)

    Liu Yachun; Zou Shuliang

    2012-01-01

    The economical efficiency of nuclear power includes a series of environmental parameters, for example, cleanliness. Nuclear security is the precondition and guarantee for its economy, and both are the direct embodiment of the social benefits of nuclear power. Through analyzing the supervision and management system on the effective operation of nuclear power plants, which has been put forward by the International Atomic Energy Agency (IAEA), the World Association of Nuclear Operators (WANO), the U.S. Nuclear Regulatory Commission (NRC), and other organizations, a set of indexs on the safety performance and economical efficiency of nuclear power are explored and established; Based on data envelopment analysis, a DEA approach is employed to evaluate the efficiency of the operation performance of several nuclear power plants, Some primary conclusion are achieved on the basis of analyzing the threshold parameter's sensitivity and relativity which affected operational performance. To address the conflicts between certain security and economical indicators, a multi-objective programming model is established, where top priority is given to nuclear safety, and the investment behavior of nuclear power plant is thereby optimized. (authors)

  18. Training of nuclear power plant operating personnel

    International Nuclear Information System (INIS)

    Anon.

    1980-04-01

    A collection is presented containing 11 papers submitted at a conference on the selection and education of specialists for operation and maintenance of nuclear power plants. The conference was attended by specialists from universities and colleges, research institutes and production plants. It debated the methods and aims of both general and specialized theoretical and practical personnel education, the proposals for teaching centre equipment, the use of simulators, computers and other aids in the teaching process; training on school reactors was included. A proposal was put forward of the system of education, the teaching process itself, the content of the basic theoretical subjects, and the method of testing pupils' knowledge. The importance was stressed of establishing a national coordination centre to safeguard the syllabus, methodology, teaching aids, and also the training proper. The system of personnel education in the Paks nuclear power plant, Hungary, is presented as an example. (M.S.)

  19. Variable Frequency Operations of an Offshore Wind Power Plant with HVDC-VSC: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Gevorgian, V.; Singh, M.; Muljadi, E.

    2011-12-01

    In this paper, a constant Volt/Hz operation applied to the Type 1 wind turbine generator. Various control aspects of Type 1 generators at the plant level and at the turbine level will be investigated. Based on DOE study, wind power generation may reach 330 GW by 2030 at the level of penetration of 20% of the total energy production. From this amount of wind power, 54 GW of wind power will be generated at offshore wind power plants. The deployment of offshore wind power plants requires power transmission from the plant to the load center inland. Since this power transmission requires submarine cable, there is a need to use High-Voltage Direct Current (HVDC) transmission. Otherwise, if the power is transmitted via alternating current, the reactive power generated by the cable capacitance may cause an excessive over voltage in the middle of the transmission distance which requires unnecessary oversized cable voltage breakdown capability. The use of HVDC is usually required for transmission distance longer than 50 kilometers of submarine cables to be economical. The use of HVDC brings another advantage; it is capable of operating at variable frequency. The inland substation will be operated to 60 Hz synched with the grid, the offshore substation can be operated at variable frequency, thus allowing the wind power plant to be operated at constant Volt/Hz. In this paper, a constant Volt/Hz operation applied to the Type 1 wind turbine generator. Various control aspects of Type 1 generators at the plant level and at the turbine level will be investigated.

  20. The Marcoule pilot plant

    International Nuclear Information System (INIS)

    Faugeras, P.; Calame Longjean, A.; Le Bouhellec, J.; Revol, G.

    1986-06-01

    The Marcoule spent fuel reprocessing pilot facility was built in 1960-1961 for extended testing of the PUREX process with various types of fuel under conditions similar to those encountered in a production plant. Extensive modification work was undertaken on the facility in 1983 in the scope of the TOR project, designed with the following objectives: - increase the throughput capacity to at least 5 metric tons of PHENIX equivalent fuel per year, - extend equipment and process R and D capability, - improve job safety by maximum use of remote handling facilities, - maximize waste conditioning treatments to produce waste forms suitable for direct storage, - provide a true industrial process demonstration in continuous operation under centralized control using computerized procedures. The redesigned plant is scheduled to begin operation during the second half of 1986. The proximity of the Industrial Prototypes Service and the ATALANTE radiochemical research laboratory scheduled to begin operation in 1990, will provide a synergistic environment in which R and D program may be carried out under exceptional conditions

  1. Effect of increased renewables generation on operation of thermal power plants

    International Nuclear Information System (INIS)

    Eser, Patrick; Singh, Antriksh; Chokani, Ndaona; Abhari, Reza S.

    2016-01-01

    Highlights: • Impacts of increased renewables in central European transmission system are assessed. • Individual transmission lines and power plants of transmission system are modelled. • Starts and ramps of thermal power plants significantly increase with increased renewables. • Impact of renewables on thermal power plants is highly dependent on location. - Abstract: High spatial and temporal resolution optimal power flow simulations of the 2013 and 2020 interconnected grid in Central Western and Eastern Europe regions are undertaken to assess the impact of an increased penetration of renewables on thermal power plants. In contrast to prior studies, the present work models each individual transmission line and power plant within the two regions. Furthermore, for conventional plants, electricity costs are determined with respect to fuel type, nameplate capacity, operating condition and geographic location; cycling costs are modeled as function of the recent operational history. For renewable power plants, costs and available power are determined using mesoscale weather simulations and hydrology models. Countrywide validation of the simulations shows that all renewable and most conventional power production is predicted with less than 10% error. It is shown that the increased penetration of renewables in 2020 will induce a 4–23% increase in the number of starts of conventional plants. The number of load ramps significantly increases by 63–181%, which underlines the necessity for equipment manufacturers and utilities to adapt to scenarios of high penetration of renewables. The increased cycling operation of coal plants is shown to depend strongly on the power plant’s location and is mainly observed in Germany and the Czech Republic. Austrian coal plants are cycled less because they supply more base load power to southern Germany, where several nuclear power plants will be phased out by 2020. Thus there is a need for more transmission capacity along

  2. Simulators predict power plant operation

    Energy Technology Data Exchange (ETDEWEB)

    Peltier, R.

    2002-07-01

    Mix the complexity of a new construction or major retrofit project with today's 'do more with less', a pinch of 'personnel inexperience,' and a dash of 'unintended consequences', and you have got a recipe for insomnia. Advanced simulation tools, however, can help you wring out your design train your operators before the first wire is terminated and just may be get a good night's rest. The article describes several examples of uses of simulation tools. Esscor recently completed a simulation project for a major US utility exploring the potential for furnace/duct implosion that could result from adding higher volumetric flow induced-draft fans and selective catalytic reduction to a 650-MW coal-fired plant. CAF Electronics Inc. provided a full-scope simulator for Alstom's KA24-1 combined-cycle power plant in Paris, France. Computational fluid dynamics (CFD) tools are being used by the Gas Technology Institute to simulate the performance of the next generation of pulverized coal combustors. 5 figs.

  3. Assessment of LWR piping design loading based on plant operating experience

    International Nuclear Information System (INIS)

    Svensson, P.O.

    1980-08-01

    The objective of this study has been to: (1) identify current Light Water Reactor (LWR) piping design load parameters, (2) identify significant actual LWR piping loads from plant operating experience, (3) perform a comparison of these two sets of data and determine the significance of any differences, and (4) make an evaluation of the load representation in current LWR piping design practice, in view of plant operating experience with respect to piping behavior and response to loading

  4. The plant operating procedure information modeling system for creation and maintenance of procedures

    International Nuclear Information System (INIS)

    Fanto, S.V.; Petras, D.S.; Reiner, R.T.; Frost, D.R.; Orendi, R.G.

    1990-01-01

    This paper reports that as a result of the accident at Three Mile Island, regulatory requirements were issued to upgrade Emergency Operating Procedures for nuclear power plants. The use of human-factored, function-oriented, EOPs were mandated to improve human reliability and to mitigate the consequences of a broad range of initiating events, subsequent failures and operator errors, without having to first diagnose the specific events. The Westinghouse Owners Group responded by developing the Emergency Response Guidelines in a human-factored, two-column format to aid in the transfer of the improved technical information to the operator during transients and accidents. The ERGs are a network of 43 interrelated guidelines which specify operator actions to be taken during plant emergencies to restore the plant to a safe and stable condition. Each utility then translates these guidelines into plant specific EOPs. The creation and maintenance of this large web of interconnecting ERGs/EOPs is an extremely complex task. This paper reports that in order to aid procedure documentation specialists with this time-consuming and tedious task, the Plant Operating Procedure Information Modeling system was developed to provide a controlled and consistent means to build and maintain the ERGs/EOPs and their supporting documentation

  5. Disk Density Tuning of a Maximal Random Packing.

    Science.gov (United States)

    Ebeida, Mohamed S; Rushdi, Ahmad A; Awad, Muhammad A; Mahmoud, Ahmed H; Yan, Dong-Ming; English, Shawn A; Owens, John D; Bajaj, Chandrajit L; Mitchell, Scott A

    2016-08-01

    We introduce an algorithmic framework for tuning the spatial density of disks in a maximal random packing, without changing the sizing function or radii of disks. Starting from any maximal random packing such as a Maximal Poisson-disk Sampling (MPS), we iteratively relocate, inject (add), or eject (remove) disks, using a set of three successively more-aggressive local operations. We may achieve a user-defined density, either more dense or more sparse, almost up to the theoretical structured limits. The tuned samples are conflict-free, retain coverage maximality, and, except in the extremes, retain the blue noise randomness properties of the input. We change the density of the packing one disk at a time, maintaining the minimum disk separation distance and the maximum domain coverage distance required of any maximal packing. These properties are local, and we can handle spatially-varying sizing functions. Using fewer points to satisfy a sizing function improves the efficiency of some applications. We apply the framework to improve the quality of meshes, removing non-obtuse angles; and to more accurately model fiber reinforced polymers for elastic and failure simulations.

  6. Plant operation data collection and database management using NIC system

    International Nuclear Information System (INIS)

    Inase, S.

    1990-01-01

    The Nuclear Information Center (NIC), a division of the Central Research Institute of Electric Power Industry, collects nuclear power plant operation and maintenance information both in Japan and abroad and transmits the information to all domestic utilities so that it can be effectively utilized for safe plant operation and reliability enhancement. The collected information is entered into the database system after being key-worded by NIC. The database system, Nuclear Information database/Communication System (NICS), has been developed by NIC for storage and management of collected information. Objectives of keywords are retrieval and classification by the keyword categories

  7. Expert systems to assist plant operation

    International Nuclear Information System (INIS)

    Matsumoto, Yoshihiro; Mori, Nobuyuki; Wada, Norio

    1985-01-01

    Large-scale real-time process control systems, such as those for electric power dispatching, large thermal and nuclear power stations, steel mill plants and manufacturing automation systems, need expert systems to assist operator's decision. The expert systems newly developed to fulfill the requirement are founded on OKBS (object oriented knowledge based system). OKBS provides various object types: fuzzy logic type, production rule type, frame type, state transition type, abstract data type and input/output transformation type. (author)

  8. Independent verification in operations at nuclear power plants: Summaries of site visits

    International Nuclear Information System (INIS)

    Donderi, D.C.; Smiley, A.; Ostry, D.J.; Moray, N.P.

    1995-09-01

    A critical review of approaches to independent verification in operations used in nuclear power plant quality assurance programs in other countries was conducted and are detailed in volume 1. This paper is a compilation of the visits to nuclear power plant sites to study independent verification in operations at sites in Canada, USA, Japan, United Kingdom, France and Germany. 3 tabs., 22 figs

  9. Administrative and managerial controls for the operation of nuclear fuel reprocessing plants

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    Guidelines are provided for the administrative and managerial controls necessary for the safe and efficient operation of nuclear fuel reprocessing plants. Topics covered include: administrative organization; review and audit; facility administrative policies and procedures; and tests and inspections. Recognizing that administrative practices vary among organizations operating nuclear fuel reprocessing plants, the standard incorporates flexibility that provides for compliance by any organization

  10. Strategic pilot for operator support system in nuclear power plant - design considerations

    International Nuclear Information System (INIS)

    Bucur, I.; Tatar, F.

    1999-01-01

    In order to improve the plant operational safety the development of an Operator Support System (OSS) is required. This system is intended to process data from nuclear systems and to provide adequate outputs to the plant operation staff. Before implementing this system, a strategic pilot should be produced as a demonstration of the technology. The strategic pilot could be considered as a means of building both skills and credibility in development and implementation of OSS. In any organization this project should be under plant management control with operation group involvement. This paper describes the managerial tasks that should be carried out to define, build and implement such a module. The main objectives, the functional requirements and the benefits of pilot implementation are revealed. Furthermore, the problem relating to the background at CNE-PROD Cernavoda is analyzed and the present achievements are pointed out. (authors)

  11. Developing a virtual reality application for training Nuclear Power Plant operators: Setting up a database containing dose rates in the refuelling plant

    International Nuclear Information System (INIS)

    Rodenas, J.; Zarza, I.; Burgos, M. C.; Felipe, A.; Sanchez-Mayoral, M. L.

    2004-01-01

    Operators in Nuclear Power Plants can receive high doses during refuelling operations. A training programme for simulating refuelling operations will be useful in reducing the doses received by workers as well as minimising operation time. With this goal in mind, a virtual reality application is developed within the framework of the CIPRES project. The application requires doses, both instantaneous and accumulated, to be displayed at all times during operator training. Therefore, it is necessary to set up a database containing dose rates at every point in the refuelling plant. This database is based on radiological protection surveillance data measured in the plant during refuelling operations. Some interpolation routines have been used to estimate doses through the refuelling plant. Different assumptions have been adopted in order to perform the interpolation and obtain consistent data. In this paper, the procedures developed to set up the dose database for the virtual reality application are presented and analysed. (authors)

  12. The human factor in high-tech plant operation

    Energy Technology Data Exchange (ETDEWEB)

    Grassani, E

    1988-02-01

    The article develops a series of considerations on reliability standards applied to operators of technologically complex industrial installations. From research conducted within the field of cognitive psychology, significant indications are emerging relative to professional training within industry, as well as to the functional and human interface characteristics of automated control systems. Recent tragic incidents (Three Mile Island nuclear power plant, Bopal methyl isocynate storage, Mexico City petroleum tank farm and Chernobylsk-4 reactor) have evidenced the greater weight that should be given to human factors in plant safety and reliability assessments and planning.

  13. Nuclear power plant control room operators' performance research

    International Nuclear Information System (INIS)

    Gray, L.H.; Haas, P.M.

    1984-01-01

    A research program is being conducted to provide information on the performance of nuclear power plant control room operators when responding to abnormal/emergency events in the plants and in full-scope training simulators. The initial impetus for this program was the need for data to assess proposed design criteria for the choice of manual versus automatic action for accomplishing safety-related functions during design basis accidents. The program also included studies of training simulator capabilities, of procedures and data for specifying and verifying simulator performance, and of methods and applications of task analysis

  14. Operation of Finnish nuclear power plants. Quarterly report, 2nd quarter, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Tossavainen, K. [ed.

    1995-10-01

    Quarterly reports on the operation of Finnish nuclear power plants describe events and observations relating to nuclear and radiation safety which the Finnish Centre for Radiation and Nuclear Safety (STUK) considers safety significant. Fasety improvements at the plants are also described. The report includes a summary of the radiation safety of plant personnel and of the evironment and tabulated data on the plants` production and load factors. Except for the annual maintenance outages of the TVO plant units and for TVO II`s Midsummer outage which was due to low electricity demand, the Finnish nuclear power plants were in power operation during the second quarter of 1995. The load factor average of all four plant units was 91.2 %. Events during the second annual quarter were level 0 on the INES scale. Occupational doses and radioactive releases off-site were below authorized limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. (4 figs., 4 tabs.).

  15. Ten year experience in operation of a sewage sludge treatment plant using gamma irradiation

    Energy Technology Data Exchange (ETDEWEB)

    Lessel, T [Abwasserverband Ampergruppe, Eichenau/Muenchen (Germany, F.R.); Suess, A [Bayerische Landesanstalt fuer Bodenkultur und Pflanzenbau, Muenchen (Germany, F.R.)

    1984-01-01

    The first sewage sludge gamma irradiation plant in a technical scale, using Co-60 has been successfully working in Geiselbullach near Munich, FRG, since July 1973. More than 250,000 m/sup 3/ of liquid sludge has been disinfected during that time. Very simple plant design, fully automatic operation over 24 hours and high availability proved the practical applicability of such a facility in a sewage water purification plant without any specially skilled personnel. Beside wide investigations for hygienic aspects, changing of the physical sludge characteristics, effect of irradiated sludge on soil and plants the economic considerations were regarded as important. Experiments were undertaken to optimize the flexibility of the plant operation and to reduce the necessary radiation dose for minimizing the operation costs.

  16. Ten year experience in operation of a sewage sludge treatment plant using gamma irradiation

    International Nuclear Information System (INIS)

    Lessel, T.; Suess, A.

    1984-01-01

    The first sewage sludge gamma irradiation plant in a technical scale, using Co-60 has been successfully working in Geiselbullach near Munich, FRG, since July 1973. More than 250,000 m 3 of liquid sludge has been disinfected during that time. Very simple plant design, fully automatic operation over 24 hours and high availability proved the practical applicability of such a facility in a sewage water purification plant without any specially skilled personnel. Beside wide investigations for hygienic aspects, changing of the physical sludge characteristics, effect of irradiated sludge on soil and plants the economic considerations were regarded as important. Experiments were undertaken to optimize the flexibility of the plant operation and to reduce the necessary radiation dose for minimizing the operation costs. (author)

  17. The first operation of the Delphos plant: Test results

    International Nuclear Information System (INIS)

    Sarno, A.; Noviello, G.; Cordisco, S.; Di Paola, L.; Guerra, M.

    1991-09-01

    The data collected during the O and M of the Delphos plant and the testing results are presented and discussed. Together with the maintenance influence on the operation and production of the plant, the various downtime causes are pointed out. An extensive activity has been carried out to investigate the actual behaviour of the photovoltaic generator and the power conditioning unit. The analysis of the experimental results allows to focus on the different causes of loss and suggest some actions to be taken in order to improve the plant efficiency and increase the energy production. (author)

  18. Optimizing power plant cycling operations while reducing generating plant damage and costs

    Energy Technology Data Exchange (ETDEWEB)

    Lefton, S A; Besuner, P H; Grimsrud, P [Aptech Engineering Services, Inc., Sunnyvale, CA (United States); Bissel, A [Electric Supply Board, Dublin (Ireland)

    1999-12-31

    This presentation describes a method for analyzing, quantifying, and minimizing the total cost of fossil, combined cycle, and pumped hydro power plant cycling operation. The method has been developed, refined, and applied during engineering studies at some 160 units in the United States and 8 units at the Irish Electric Supply Board (ESB) generating system. The basic premise of these studies was that utilities are underestimating the cost of cycling operation. The studies showed that the cost of cycling conventional boiler/turbine fossil power plants can range from between $2,500 and $500,000 per start-stop cycle. It was found that utilities typically estimate these costs by factors of 3 to 30 below actual costs and, thus, often significantly underestimate their true cycling costs. Knowledge of the actual, or total, cost of cycling will reduce power production costs by enabling utilities to more accurately dispatch their units to manage unit life expectancies, maintenance strategies and reliability. Utility management responses to these costs are presented and utility cost savings have been demonstrated. (orig.) 7 refs.

  19. Optimizing power plant cycling operations while reducing generating plant damage and costs

    Energy Technology Data Exchange (ETDEWEB)

    Lefton, S.A.; Besuner, P.H.; Grimsrud, P. [Aptech Engineering Services, Inc., Sunnyvale, CA (United States); Bissel, A. [Electric Supply Board, Dublin (Ireland)

    1998-12-31

    This presentation describes a method for analyzing, quantifying, and minimizing the total cost of fossil, combined cycle, and pumped hydro power plant cycling operation. The method has been developed, refined, and applied during engineering studies at some 160 units in the United States and 8 units at the Irish Electric Supply Board (ESB) generating system. The basic premise of these studies was that utilities are underestimating the cost of cycling operation. The studies showed that the cost of cycling conventional boiler/turbine fossil power plants can range from between $2,500 and $500,000 per start-stop cycle. It was found that utilities typically estimate these costs by factors of 3 to 30 below actual costs and, thus, often significantly underestimate their true cycling costs. Knowledge of the actual, or total, cost of cycling will reduce power production costs by enabling utilities to more accurately dispatch their units to manage unit life expectancies, maintenance strategies and reliability. Utility management responses to these costs are presented and utility cost savings have been demonstrated. (orig.) 7 refs.

  20. IAEA Leads Operational Safety Mission to Smolensk Nuclear Power Plant

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of nuclear safety experts led by the International Atomic Energy Agency (IAEA) has reviewed the Smolensk Nuclear Power Plant (NPP) near Desnogorsk, in Russia's Smolensk region, for its safety practices and has noted a series of good practices as well as recommendations and suggestions to reinforce them. The IAEA assembled the team at the request of the Government of the Russian Federation to conduct an Operational Safety Review (OSART) of the NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety, the OSART team performed an in-depth operational safety review from 5 to 22 September 2011. The team was made up of experts from China, India, Lithuania, Slovakia, South Africa, Sweden, UK, USA, the World Association of Nuclear Operators and the IAEA. The team conducted an in-depth review of the aspects essential to the safe operation of the Smolensk NPP. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Training; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; and Chemistry. Throughout the review, the exchange of information between the OSART experts and plant personnel was very open, professional and productive. The plant's staff were found to be motivated, well trained, knowledgeable and experienced. The OSART team has identified good plant practices which will be shared with the rest of the nuclear industry for consideration of their application. Examples include the following: Illuminated hot-spot wire to identify higher radiation levels is used in the radiation-controlled area to reduce exposures when working in the controlled area; Modern and state-of-the-art training infrastructure and facilities are available at the plant. These include: maintenance training centre; multimedia simulator for the refueling machine; and safety