WorldWideScience

Sample records for matters permit requirements

  1. 49 CFR 176.99 - Permit requirements for certain hazardous materials.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Permit requirements for certain hazardous materials. 176.99 Section 176.99 Transportation Other Regulations Relating to Transportation PIPELINE AND... CARRIAGE BY VESSEL Special Requirements for Barges § 176.99 Permit requirements for certain hazardous...

  2. 29 CFR 1910.146 - Permit-required confined spaces.

    Science.gov (United States)

    2010-07-01

    ... any failure of hazard control or monitoring equipment) or event internal or external to the permit... could be trapped or asphyxiated by inwardly converging walls or by a floor which slopes downward and... complying with the permit space requirements that apply to all employers, each contractor who is retained to...

  3. 23 CFR 650.805 - Bridges not requiring a USCG permit.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Bridges not requiring a USCG permit. 650.805 Section 650... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... permit is not required for bridge construction. This determination shall be made at an early stage of...

  4. 23 CFR 650.807 - Bridges requiring a USCG permit.

    Science.gov (United States)

    2010-04-01

    ... engineering, social, economic and environmental benefit and impacts. (e) The HA shall consider hydraulic... permit. (a) The USCG has the responsibility (1) to determine whether a USCG permit is required for the... the USCG to be involved throughout the environmental review process in accordance with 23 CFR part 771...

  5. 40 CFR 60.4122 - Information requirements for Hg budget permit applications.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Information requirements for Hg budget... requirements for Hg budget permit applications. A complete Hg Budget permit application shall include the following elements concerning the Hg Budget source for which the application is submitted, in a format...

  6. 40 CFR 60.4120 - General Hg budget trading program permit requirements.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false General Hg budget trading program... and Compliance Times for Coal-Fired Electric Steam Generating Units Permits § 60.4120 General Hg budget trading program permit requirements. (a) For each Hg Budget source required to have a title V...

  7. 40 CFR 158.270 - Experimental use permit data requirements for residue chemistry.

    Science.gov (United States)

    2010-07-01

    ... requirements for residue chemistry. 158.270 Section 158.270 Protection of Environment ENVIRONMENTAL PROTECTION... Experimental use permit data requirements for residue chemistry. All residue chemistry data, as described in... section 408(r) is sought. Residue chemistry data are not required for an experimental use permit issued on...

  8. 19 CFR 12.7 - Permits required for importation.

    Science.gov (United States)

    2010-04-01

    ... Department of Health and Human Services under the said act require that each container of milk or cream... THE TREASURY SPECIAL CLASSES OF MERCHANDISE Milk and Cream § 12.7 Permits required for importation. (a... Federal Import Milk Act, the importation into the United States of milk and cream is prohibited unless the...

  9. 40 CFR 158.210 - Experimental use permit data requirements for product chemistry.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Experimental use permit data requirements for product chemistry. 158.210 Section 158.210 Protection of Environment ENVIRONMENTAL PROTECTION... Experimental use permit data requirements for product chemistry. All product chemistry data, as described in...

  10. 50 CFR 13.12 - General information requirements on applications for permits.

    Science.gov (United States)

    2010-10-01

    ... available, occupation, and any business, agency, organizational, or institutional affiliation associated... permits, together with any additional justification, including supporting documentation as required by the... permit Section Importation at nondesignated ports: Scientific 14.31 Deterioration prevention 14.32...

  11. 10 CFR 205.329 - Environmental requirements for Presidential Permits-Alternative 2.

    Science.gov (United States)

    2010-01-01

    ... Facilities for Transmission of Electric Energy at International Boundaries § 205.329 Environmental... 10 Energy 3 2010-01-01 2010-01-01 false Environmental requirements for Presidential Permits... such Presidential Permits: (1) ERA will determine whether an Environmental Impact Statement (EIS) or an...

  12. 78 FR 38555 - Importer Permit Requirements for Tobacco Products and Processed Tobacco, and Other Requirements...

    Science.gov (United States)

    2013-06-27

    ..., and Other Requirements for Tobacco Products, Processed Tobacco, and Cigarette Papers and Tubes AGENCY... administration and enforcement of importer permits over the past decade, TTB believes that it can gain... minimum manufacturing and marking requirements for tobacco products and cigarette papers and tubes, and...

  13. 40 CFR 158.2080 - Experimental use permit data requirements-biochemical pesticides.

    Science.gov (United States)

    2010-07-01

    ... requirements-biochemical pesticides. 158.2080 Section 158.2080 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS DATA REQUIREMENTS FOR PESTICIDES Biochemical Pesticides § 158.2080 Experimental use permit data requirements—biochemical pesticides. (a) Sections 158.2081...

  14. 40 CFR 158.2170 - Experimental use permit data requirements-microbial pesticides.

    Science.gov (United States)

    2010-07-01

    ... requirements-microbial pesticides. 158.2170 Section 158.2170 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS DATA REQUIREMENTS FOR PESTICIDES Microbial Pesticides § 158.2170 Experimental use permit data requirements—microbial pesticides. (a) For all microbial pesticides. (1) The...

  15. Requirements for permitting a mixed waste incinerator

    International Nuclear Information System (INIS)

    Trichon, M.; Feldman, J.; Serne, J.C.

    1990-01-01

    The consideration, design, selection and operation of any incinerator depends primarily on characteristic quality (ultimate and proximate analyses) and quantity to the waste to be incinerated. In the case of burning any combination of mixed hazardous, biomedical and radioactive low level waste, specific federal and generic state environmental regulatory requirements are outlined. Combustion chamber temperature and waste residence time requirements will provide the rest of the envelope for consideration. Performance requirements must be balanced between the effects of time and temperature on destruction of the organic waste and the vaporization and possible emission of the inorganic waste components (e.g., toxic metals, radioactive inorganics) as operating conditions and emission levels will be set in state and federal regulatory permits. To this end the complete characterization of the subject waste stream must be determined if an accurate assessment of incineration effectiveness and impact are to be performed

  16. 40 CFR 158.2172 - Experimental use permit microbial pesticides residue data requirements table.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Experimental use permit microbial....2172 Experimental use permit microbial pesticides residue data requirements table. (a) General. Sections 158.100 through 158.130 describe how to use this table to determine the residue chemistry data...

  17. 10 CFR 205.328 - Environmental requirements for Presidential Permits-Alternative 1.

    Science.gov (United States)

    2010-01-01

    ... Facilities for Transmission of Electric Energy at International Boundaries § 205.328 Environmental... 10 Energy 3 2010-01-01 2010-01-01 false Environmental requirements for Presidential Permits... responsible for the costs of preparing any necessary environmental document, including an Environmental Impact...

  18. 7 CFR 330.200 - Movement of plant pests regulated; permits required.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Movement of plant pests regulated; permits required... AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FEDERAL PLANT PEST REGULATIONS; GENERAL; PLANT PESTS; SOIL, STONE, AND QUARRY PRODUCTS; GARBAGE Movement of Plant Pests § 330.200 Movement of...

  19. Upgrades to meet LANL SF, 121-2011, hazardous waste facility permit requirements

    International Nuclear Information System (INIS)

    French, Sean B.; Johns-Hughes, Kathryn W.

    2011-01-01

    Members of San IIdefonso have requested information from LANL regarding implementation of the revision to LANL's Hazardous Waste Facility Permit (the RCRA Permit). On January 26, 2011, LANL staff from the Waste Disposition Project and the Environmental Protection Division will provide a status update to Pueblo members at the offices of the San IIdefonso Department of Environmental and Cultural Preservation. The Waste Disposition Project presentation will focus on upgrades and improvements to LANL waste management facilities at TA-50 and TA-54. The New Mexico Environment Department issued LANL's revised Hazardous Waste Facility permit on November 30, 2010 with a 30-day implementation period. The Waste Disposition Project manages and operates four of LANL's permitted facilities; the Waste Characterization, Reduction and Repackaging Facility (WCRRF) at TA-SO, and Area G, Area L and the Radioassay and Nondestructive Testing facility (RANT) at TA-54. By implementing a combination of permanent corrective action activities and shorter-term compensatory measures, WDP was able to achieve functional compliance on December 30, 2010 with new Permit requirements at each of our facilities. One component of WOP's mission at LANL is centralized management and disposition of the Laboratory's hazardous and mixed waste. To support this mission objective, WOP has undertaken a project to upgrade our facilities and equipment to achieve fully compliant and efficient waste management operations. Upgrades to processes, equipment and facilities are being designed to provide defense-in-depth beyond the minimum, regulatory requirements where worker safety and protection of the public and the environment are concerned. Upgrades and improvements to enduring waste management facilities and operations are being designed so as not to conflict with future closure activities at Material Disposal Area G and Material Disposal Area L.

  20. 40 CFR 123.25 - Requirements for permitting.

    Science.gov (United States)

    2010-07-01

    ... MS4, may I share the responsibility to implement the minimum control measures with other entities... held prior to issuing any permit while reducing the amount of advance notice of such a hearing. State... individual, including the Director, who has or shares authority to approve all or portions of permits either...

  1. Hanford Site air operating permit application

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

  2. Hanford Site air operating permit application

    International Nuclear Information System (INIS)

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ''regulated'' pollutants. Regulated pollutants include ''criteria'' pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ''Hazardous'' Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995

  3. 30 CFR 903.785 - Requirements for permits for special categories of mining.

    Science.gov (United States)

    2010-07-01

    ... of mining. 903.785 Section 903.785 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE ARIZONA § 903.785 Requirements for permits for special categories of mining. Part 785 of this...

  4. 30 CFR 912.785 - Requirements for permits for special categories of mining.

    Science.gov (United States)

    2010-07-01

    ... of mining. 912.785 Section 912.785 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE IDAHO § 912.785 Requirements for permits for special categories of mining. Part 785 of this...

  5. 30 CFR 910.785 - Requirements for permits for special categories of mining.

    Science.gov (United States)

    2010-07-01

    ... of mining. 910.785 Section 910.785 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE GEORGIA § 910.785 Requirements for permits for special categories of mining. Part 785 of this...

  6. 30 CFR 905.785 - Requirements for permits for special categories of mining.

    Science.gov (United States)

    2010-07-01

    ... of mining. 905.785 Section 905.785 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE CALIFORNIA § 905.785 Requirements for permits for special categories of mining. Part 785 of this...

  7. 30 CFR 921.785 - Requirements for permits for special categories of mining.

    Science.gov (United States)

    2010-07-01

    ... of mining. 921.785 Section 921.785 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE MASSACHUSETTS § 921.785 Requirements for permits for special categories of mining. Part 785 of...

  8. 30 CFR 922.785 - Requirements for permits for special categories of mining.

    Science.gov (United States)

    2010-07-01

    ... of mining. 922.785 Section 922.785 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE MICHIGAN § 922.785 Requirements for permits for special categories of mining. Part 785 of this...

  9. 30 CFR 939.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 939.784 Section 939.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  10. 30 CFR 941.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 941.784 Section 941.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  11. 30 CFR 933.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 933.784 Section 933.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  12. 30 CFR 921.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 921.784 Section 921.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  13. 30 CFR 903.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 903.784 Section 903.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, applies to any person who submits an application...

  14. 30 CFR 910.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 910.784 Section 910.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  15. 30 CFR 947.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 947.784 Section 947.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  16. 30 CFR 942.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 942.784 Section 942.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  17. 30 CFR 921.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 921.780 Section 921.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  18. 30 CFR 922.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 922.784 Section 922.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  19. 30 CFR 933.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 933.780 Section 933.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  20. 30 CFR 905.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 905.784 Section 905.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  1. 30 CFR 937.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 937.784 Section 937.784 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  2. 30 CFR 942.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 942.780 Section 942.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  3. 30 CFR 912.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 912.780 Section 912.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  4. 30 CFR 939.780 - Surface mining permit applications-minimum requirements for reclamation and operations plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operations plan. 939.780 Section 939.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operations plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  5. 30 CFR 905.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 905.780 Section 905.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  6. 30 CFR 947.780 - Surface mining permit application-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 947.780 Section 947.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Application—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  7. 30 CFR 910.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 910.780 Section 910.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirement for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  8. 30 CFR 922.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 922.780 Section 922.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  9. 30 CFR 903.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 903.780 Section 903.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, applies to any person who submits an application to conduct...

  10. 30 CFR 912.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 912.784 Section 912.784 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  11. 30 CFR 937.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 937.780 Section 937.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirement for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  12. 30 CFR 941.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 941.780 Section 941.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  13. 75 FR 30395 - Stakeholder Input; National Pollutant Discharge Elimination System (NPDES) Permit Requirements...

    Science.gov (United States)

    2010-06-01

    ... peak flow as part of an SSO rulemaking to allow for a holistic and integrated approach to reducing SSOs... Charles Glass, EPA Headquarters, Office of Water, Office of Wastewater Management at tel.: 202-564-0418 or... principles with the following suggested NPDES permit requirements: (1) Capacity, management, operation and...

  14. Data requirements for valuing externalities: The role of existing permitting processes

    Energy Technology Data Exchange (ETDEWEB)

    Lee, A.D.; Baechler, M.C.; Callaway, J.M.

    1990-08-01

    While the assessment of externalities, or residual impacts, will place new demands on regulators, utilities, and developers, existing processes already require certain data and information that may fulfill some of the data needs for externality valuation. This paper examines existing siting, permitting, and other processes and highlights similarities and differences between their data requirements and the data required to value environmental externalities. It specifically considers existing requirements for siting new electricity resources in Oregon and compares them with the information and data needed to value externalities for such resources. This paper also presents several observations about how states can take advantage of data acquired through processes already in place as they move into an era when externalities are considered in utility decision-making. It presents other observations on the similarities and differences between the data requirements under existing processes and those for valuing externalities. This paper also briefly discusses the special case of cumulative impacts. And it presents recommendations on what steps to take in future efforts to value externalities. 35 refs., 2 tabs.

  15. 25 CFR 166.309 - Who determines livestock class and livestock ownership requirements on permitted Indian land?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Who determines livestock class and livestock ownership... livestock class and livestock ownership requirements on permitted Indian land? (a) Tribes determine the class of livestock and livestock ownership requirements for livestock that may be grazed on range units...

  16. Federal Fisheries Permit (FFP)/ Federal Processor Permit (FPP) Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Federal Fisheries Permit (FFP) is required for vessels of the United States which are used to fish for groundfish in the Gulf of Alaska or Bering Sea and...

  17. Storm water permitting for oil and gas facilities

    International Nuclear Information System (INIS)

    de Blanc, P.C.

    1991-01-01

    After several false starts, the US Environmental Protection Agency (EPA) published new federal storm water regulations in the November 16, 1990 Federal Register. These regulations identify facilities which must apply for a storm water permit and detail permit application requirements. The regulations appear at 40 CFR 122 Subpart B and became effective December 17, 1990. An outline of these regulations and their applicability to oil and gas facilities is presented. They are: facilities which require a storm water permit; types of storm water permits; permit application deadlines; permit application forms; facilities with existing storm water permits; storm water permit application data requirements; storm water sampling and analysis requirements; and EPA contacts for additional information

  18. 40 CFR 70.6 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... § 70.5(d) of this part. (B) Prompt reporting of deviations from permit requirements, including those... corrective actions or preventive measures taken. The permitting authority shall define “prompt” in relation... and air pollution control equipment), practices, or operations regulated or required under the permit...

  19. Groundwater monitoring of hydraulic fracturing in California: Recommendations for permit-required monitoring

    Science.gov (United States)

    Esser, B. K.; Beller, H. R.; Carroll, S.; Cherry, J. A.; Jackson, R. B.; Jordan, P. D.; Madrid, V.; Morris, J.; Parker, B. L.; Stringfellow, W. T.; Varadharajan, C.; Vengosh, A.

    2015-12-01

    California recently passed legislation mandating dedicated groundwater quality monitoring for new well stimulation operations. The authors provided the State with expert advice on the design of such monitoring networks. Factors that must be considered in designing a new and unique groundwater monitoring program include: Program design: The design of a monitoring program is contingent on its purpose, which can range from detection of individual well leakage to demonstration of regional impact. The regulatory goals for permit-required monitoring conducted by operators on a well-by-well basis will differ from the scientific goals of a regional monitoring program conducted by the State. Vulnerability assessment: Identifying factors that increase the probability of transport of fluids from the hydrocarbon target zone to a protected groundwater zone enables the intensity of permit-required monitoring to be tiered by risk and also enables prioritization of regional monitoring of groundwater basins based on vulnerability. Risk factors include well integrity; proximity to existing wellbores and geologic features; wastewater disposal; vertical separation between the hydrocarbon and groundwater zones; and site-specific hydrogeology. Analyte choice: The choice of chemical analytes in a regulatory monitoring program is guided by the goals of detecting impact, assuring public safety, preventing resource degradation, and minimizing cost. Balancing these goals may be best served by tiered approach in which targeted analysis of specific chemical additives is triggered by significant changes in relevant but more easily analyzed constituents. Such an approach requires characterization of baseline conditions, especially in areas with long histories of oil and gas development. Monitoring technology: Monitoring a deep subsurface process or a long wellbore is more challenging than monitoring a surface industrial source. The requirement for monitoring multiple groundwater aquifers across

  20. The National Solar Permitting Database

    Energy Technology Data Exchange (ETDEWEB)

    2014-08-31

    "The soft costs of solar — costs not associated with hardware — remain stubbornly high. Among the biggest soft costs are those associated with inefficiencies in local permitting and inspection. A study by the National Renewable Energy Laboratory and Lawrence Berkeley National Laboratory estimates that these costs add an average of $0.22/W per residential installation. This project helps reduce non-hardware/balance of system (BOS) costs by creating and maintaining a free and available site of permitting requirements and solar system verification software that installers can use to reduce time, capital, and resource investments in tracking permitting requirements. Software tools to identify best permitting practices can enable government stakeholders to optimize their permitting process and remove superfluous costs and requirements. Like ""a Wikipedia for solar permitting"", users can add, edit, delete, and update information for a given jurisdiction. We incentivize this crowdsourcing approach by recognizing users for their contributions in the form of SEO benefits to their company or organization by linking back to users' websites."

  1. Tradeable carbon permits

    International Nuclear Information System (INIS)

    Koutstaal, P.R.

    1995-01-01

    The research project on tradeable carbon permits has focused on three elements. First of all, the practical implications of designing a system of tradeable emission permits for reducing CO2 has been studied. In the second part, the consequences of introducing a system of tradeable carbon permits for entry barriers have been considered. Finally, the institutional requirements and welfare effects of coordination of CO2 abatement in a second-best world have been examined

  2. 40 CFR 122.34 - As an operator of a regulated small MS4, what will my NPDES MS4 storm water permit require?

    Science.gov (United States)

    2010-07-01

    ... NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM Permit Application and Special NPDES Program Requirements... water impacts. For example, providing information to restaurants on the impact of grease clogging storm... minimum, the relevant requirements of paragraph (b) of this section. (d)(1) In your permit application...

  3. The Contribution of Environmental Siting and Permitting Requirements to the Cost of Energy for Wave Energy Devices

    Energy Technology Data Exchange (ETDEWEB)

    Copping, Andrea E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Geerlofs, Simon H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hanna, Luke A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-06-01

    Responsible deployment of marine and hydrokinetic (MHK) devices in estuaries, coastal areas, and major rivers requires that biological resources and ecosystems be protected through siting and permitting (consenting) processes. Scoping appropriate deployment locations, collecting pre-installation (baseline) and post-installation data all add to the cost of developing MHK projects, and hence to the cost of energy. Under the direction of the U.S. Department of Energy, Pacific Northwest National Laboratory scientists have developed logic models that describe studies and processes for environmental siting and permitting. Each study and environmental permitting process has been assigned a cost derived from existing and proposed tidal, wave, and riverine MHK projects. Costs have been developed at the pilot scale and for commercial arrays for a surge wave energy converter

  4. ER-16 regulation. Requirements for granting the permit exceptional use of medical devices in humans

    International Nuclear Information System (INIS)

    2015-01-01

    The purpose of this regulation is to establish requirements for applying for a permit exceptional use of medical equipment in Human Beings, the procedures for the evaluation process and bestowal. This regulation is aimed at researchers and designers of medical equipment, related to or associated with National Health Service's priority programs of interest to health.

  5. 9 CFR 78.2 - Handling of certificates, permits, and “S” brand permits for interstate movement of animals.

    Science.gov (United States)

    2010-01-01

    ... âSâ brand permits for interstate movement of animals. 78.2 Section 78.2 Animals and Animal Products... certificates, permits, and “S” brand permits for interstate movement of animals. (a) Any certificate, permit, or “S” brand permit required by this part for the interstate movement of animals shall be delivered...

  6. State Waste Discharge Permit ST-4502 Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  7. State Waste Discharge Permit ST-4502 Implementation Plan

    International Nuclear Information System (INIS)

    BROWN, M.J.; LECLAIR, M.D.

    2000-01-01

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements

  8. Convention on the Prevention of Marine Pollution by Dumping of Wastes and other Matter. The Definition Required by Annex I, paragraph 6 to the Convention and the Recommendations Required by Annex II, Section D

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1975-01-10

    Paragraph 6 of Annex I to the Convention on the Prevention of Marine Pollution by Dumping of Wastes and Other Matter provides for the Agency to define high-level radioactive wastes or other high-level radioactive matter as unsuitable for dumping at sea, and section D of Annex II provides for the Agency to make recommendations which the Contracting Parties to the Convention should take fully into account in issuing permits for the dumping at sea of radioactive wastes or other radioactive matter ''not included in Annex I''.

  9. Convention on the Prevention of Marine Pollution by Dumping of Wastes and other Matter. The Definition Required by Annex I, paragraph 6 to the Convention and the Recommendations Required by Annex II, Section D

    International Nuclear Information System (INIS)

    1975-01-01

    Paragraph 6 of Annex I to the Convention on the Prevention of Marine Pollution by Dumping of Wastes and Other Matter provides for the Agency to define high-level radioactive wastes or other high-level radioactive matter as unsuitable for dumping at sea, and section D of Annex II provides for the Agency to make recommendations which the Contracting Parties to the Convention should take fully into account in issuing permits for the dumping at sea of radioactive wastes or other radioactive matter ''not included in Annex I''.

  10. 40 CFR 71.6 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... § 71.5(d). (B) Prompt reporting of deviations from permit requirements, including those attributable to... prompt or otherwise specifies a time frame for reporting deviations, that definition or time frame shall... and air pollution control equipment), practices, or operations regulated or required under the permit...

  11. Vessel Permit System Data Set

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — GARFO issues federal fishing permits annually to owners of fishing vessels who fish in the Greater Atlantic region, as required by federal regulation. These permits...

  12. 49 CFR 241.13 - Prohibition against track owner's requiring or permitting use of its line for a railroad...

    Science.gov (United States)

    2010-10-01

    ... OF UNITED STATES RAIL OPERATIONS § 241.13 Prohibition against track owner's requiring or permitting... for compliance with this section and subject to civil penalties under § 241.15. A common carrier by...

  13. Air quality permits in Texas and New Mexico

    International Nuclear Information System (INIS)

    Fusselman, D.K.; Hofmann, J.E.

    1991-01-01

    Permitting gas processing equipment ranges from fairly simple procedures under the Texas Air Control Board (TACB) Standard Exemption List and the New Mexico Environmental Improvement Division (NMEID) Registration Regulations to an extremely complicated procedure requiring a federal Prevention of Significant Deterioration (PSD) and/or non-attainment review. The following topics relating to obtaining air permits for gas plants will be addressed in this paper: Type of permit/exemption necessary for construction, Specific permit/exemption requirements, New Source Performance Standards (NSPS) Subparts KKK, LLL, GG, K, Ka and Kb, Potential effects of the Federal Clean Air Act Amendments (FCAA). This paper only addresses specific permitting concerns and requirements that apply to the natural gas production industry. The same requirements apply to other industries, with possible additional requirements of National Emission Standards for Hazardous Air Pollutants (NESHAP), NSPS other than Subparts KKK, LLL, GG, K, Ka and Kb, and non-attainment review for pollutants other than ozone

  14. Guide to Permitting Hydrogen Motor Fuel Dispensing Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Rivkin, Carl [National Renewable Energy Lab. (NREL), Golden, CO (United States); Buttner, William [National Renewable Energy Lab. (NREL), Golden, CO (United States); Burgess, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-03-28

    The purpose of this guide is to assist project developers, permitting officials, code enforcement officials, and other parties involved in developing permit applications and approving the implementation of hydrogen motor fuel dispensing facilities. The guide facilitates the identification of the elements to be addressed in the permitting of a project as it progresses through the approval process; the specific requirements associated with those elements; and the applicable (or potentially applicable) codes and standards by which to determine whether the specific requirements have been met. The guide attempts to identify all applicable codes and standards relevant to the permitting requirements.

  15. 30 CFR 773.10 - Review of permit history.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Review of permit history. 773.10 Section 773.10... REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING § 773.10 Review of permit history. (a) We, the regulatory authority, will rely upon the permit history information you, the applicant, submit under § 778.12 of this...

  16. Charge Asymmetric Cosmic Rays as a probe of Flavor Violating Asymmetric Dark Matter

    DEFF Research Database (Denmark)

    Masina, Isabella; Sannino, Francesco

    2011-01-01

    The recently introduced cosmic sum rules combine the data from PAMELA and Fermi-LAT cosmic ray experiments in a way that permits to neatly investigate whether the experimentally observed lepton excesses violate charge symmetry. One can in a simple way determine universal properties of the unknown...... component of the cosmic rays. Here we attribute a potential charge asymmetry to the dark sector. In particular we provide models of asymmetric dark matter able to produce charge asymmetric cosmic rays. We consider spin zero, spin one and spin one-half decaying dark matter candidates. We show that lepton...... flavor violation and asymmetric dark matter are both required to have a charge asymmetry in the cosmic ray lepton excesses. Therefore, an experimental evidence of charge asymmetry in the cosmic ray lepton excesses implies that dark matter is asymmetric....

  17. 50 CFR 20.64 - Foreign export permits.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Foreign export permits. 20.64 Section 20... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD HUNTING Importations § 20.64 Foreign export permits. No... such birds are accompanied by export permits, tags, or other documentation required by applicable...

  18. 30 CFR 773.23 - Suspension or rescission requirements for improvidently issued permits.

    Science.gov (United States)

    2010-07-01

    ... improvidently issued permits. 773.23 Section 773.23 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL... jurisdiction over the violation; (2) You or your operator no longer own or control the relevant operation; (3...

  19. Group NPDES stormwater permit application: The Conoco experience

    International Nuclear Information System (INIS)

    Holler, J.D.

    1993-01-01

    The US Environmental Protection Agency (USEPA) has reported that stormwater runoff is a major cause of pollution and use impairment to waters of the nation. Diffuse pollution sources (stormwater runoff) are increasingly important as controls for industrial process dischargers. On November 16, 1990 the Federal Clean Water Act National Pollutant Discharge Elimination System (NPDES) rules governing the discharge of stormwater were published (56 FR 40948). These rules potentially affect every type of business enterprise conducting work ''associated with industrial activity.'' Dischargers of stormwater associated with industrial activity ar required to either seek coverage under a federal or state general permit using notice of intent, apply for an individual permit, or apply for a permit through a two-part group application process. Conoco, Inc. Supply and Transportation (S and T) elected the latter alternative to attempt to comply with these new evolving complex, broad-ranging permitting requirements. This paper discusses specific details of S and T's strategy, BMP designs, data acquisition activities, monitoring results, as well as economic impacts on the corporation as a result of storm water permit requirements. S and T operates approximately 170 unique wholly and jointly owned petroleum product storage and transport facilities across the nation. Approximately one-third of these facilities were subject to stormwater permit application requirements

  20. 50 CFR 21.12 - General exceptions to permit requirements.

    Science.gov (United States)

    2010-10-01

    ..., as amended (40 Stat. 755; 16 U.S.C. 703-(711), may, without a permit, take or otherwise acquire, hold in custody, transport, and dispose of migratory birds or their parts, nests, or eggs as necessary in performing their official duties. (b) Employees of certain public and private institutions: (b)(1) State game...

  1. 40 CFR 71.25 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... such reports; and (ii) Prompt reporting of any deviations from permit requirements, including those... “prompt” in the permit for each situation and will do so in relation to the degree and type of deviation... reasonable times any facilities, equipment (including monitoring and air pollution control equipment...

  2. 50 CFR 21.41 - Depredation permits.

    Science.gov (United States)

    2010-10-01

    ... PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Control of Depredating and Otherwise Injurious Birds § 21.41... control purposes. No permit is required merely to scare or herd depredating migratory birds other than... other means of concealment, decoys, duck calls, or other devices to lure or entice birds within gun...

  3. Permitting plan for Project W-340, Tank 241-C-106 manipulator retrieval arm

    International Nuclear Information System (INIS)

    Tollefson, K.S.

    1995-01-01

    This document describes the regulatory requirements and describes alternative strategies for obtaining permits and approvals for Project W-340, Tank 241-C-106 Manipulator Retrieval Arm. A comprehensive review of environmental regulations has indicated that several environmental reviews, permits, and approvals are required before design, construction, and operation of the facility. The environmental reviews, permits, and approvals, as well the regulatory authority potentially applicable to the Project W-340 Long Reach Manipulator Arm include the following: National Environmental Policy Act of 1969 -- US Department of Energy, Headquarters; State Environmental Policy Act of 1971 -- State of Washington Department of Ecology; Air Permitting; Dangerous Waste Permitting; Miscellaneous Reviews/Permits/Approvals. This document describes the environmental reviews, permits, and approval requirements for the project. It provides a summary of permit application data requirements, alternative strategies for permit completion and approval, as well as the estimated probability of success for each alternative strategy

  4. Pollution permits allocation and imperfect competition; Allocation de permis de pollution et concurrence imparfaite

    Energy Technology Data Exchange (ETDEWEB)

    Schwartz, S.

    2004-12-15

    The aim of this thesis is to highlight the imperfections on the permits markets and to analyze their consequences on markets' efficiency. More precisely, we try to identify the implications of the initial allocation of permits when such imperfections are present. We try to draw some conclusions for the regulator concerning the different forms of the permits' allocation. After having described and compared these forms, we define in which circumstances the initial allocation matters in terms of efficiency. Then, we study different forms of imperfections. First, we take into account the information asymmetry between firms and the regulator and we define an optimal mechanism to sell pollution permits. Then, we analyze a market power on a differentiated pollution permits market. At last, we study the exclusionary manipulation of pollution permits market. (author)

  5. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    Energy Technology Data Exchange (ETDEWEB)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow when filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.

  6. The Contribution of Environmental Siting and Permitting Requirements to the Cost of Energy for Oscillating Water Column Wave Energy Devices

    Energy Technology Data Exchange (ETDEWEB)

    Copping, Andrea E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Geerlofs, Simon H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hanna, Luke A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-09-01

    Responsible deployment of marine and hydrokinetic (MHK) devices in estuaries, coastal areas, and major rivers requires that biological resources and ecosystems be protected through siting and permitting (consenting) processes. Scoping appropriate deployment locations, collecting pre-installation (baseline) and post-installation data all add to the cost of developing MHK projects, and hence to the cost of energy. Under the direction of the U.S. Department of Energy, Pacific Northwest National Laboratory scientists have developed logic models that describe studies and processes for environmental siting and permitting. Each study and environmental permitting process has been assigned a cost derived from existing and proposed tidal, wave, and riverine MHK projects, as well as expert opinion of marine environmental research professionals. Cost estimates have been developed at the pilot and commercial scale. The reference model described in this document is an oscillating water column device deployed in Northern California at approximately 50 meters water depth.

  7. 50 CFR 21.27 - Special purpose permits.

    Science.gov (United States)

    2010-10-01

    ... certification required by part 13 and makes a sufficient showing of benefit to the migratory bird resource..., salvage, otherwise acquire, transport, or possess migratory birds, their parts, nests, or eggs for any... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Specific Permit Provisions § 21.27 Special purpose...

  8. Allegheny County Asbestos Permits

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Current asbestos permit data issued by the County for commercial building demolitions and renovations as required by the EPA. This file is updated daily and can be...

  9. 40 CFR 125.3 - Technology-based treatment requirements in permits.

    Science.gov (United States)

    2010-07-01

    ... fundamentally different control technology than under permits for an industrial category issued before such date... reduction benefits to be achieved from such application; (ii) The age of equipment and facilities involved... to the cost and level of reduction of such pollutants from a class or category of industrial sources...

  10. Coping with EPA's new petroleum industry storm water permits

    International Nuclear Information System (INIS)

    Veal, S.C.; Whitescarver, J.P.

    1994-01-01

    The United States Environmental Protection Agency has just released for public comment its so-called multi-sector industry specific storm water permit. This permit -- developed in response to the 730 group storm water permit applications submitted in 1992 to EPA -- proposes the establishment of specific runoff sampling and facility design requirements for at least two petroleum industry sectors. This proposed permit establishes specific conditions for the oil and gas extraction section (SIC group 13) and for lubricant manufacturers (SIC 2992). Permit conditions are also established for allied industrial sectors such as the chemical, transportation and asphalt materials industries. By most standards, the proposed permit is much tougher than EPA's baseline general permit for storm water discharges which was released in September of 1992. For example, under the proposal, most industries are required to perform periodic storm water sampling. EPA has also established storm water effluent and performance standards for several industrial categories. This paper will discuss the petroleum industry specific conditions of the new permit. The paper will also discuss the results of the industry-wide storm water sampling efforts undertaken by more than 300 oil patch facilities across the country. In particular, sampling results will be discussed in the context to the permit conditions proposed by EPA. The paper will also discuss strategies for dealing with the new permits

  11. Permitting mixed waste treatment, storage and disposal facilities: A mixed bag

    International Nuclear Information System (INIS)

    Ranek, N.L.; Coalgate, J.L.

    1995-01-01

    The Federal Facility Compliance Act of 1992 (FFCAct) requires the U.S. Department of Energy (DOE) to make a comprehensive national inventory of its mixed wastes (i.e., wastes that contain both a hazardous component that meets the Resource Conservation and Recovery Act (RCRA) definition of hazardous waste and a radioactive component consisting of source, special nuclear, or byproduct material regulated under the Atomic Energy Act (AEA)), and of its mixed waste treatment technologies and facilities. It also requires each DOE facility that stores or generates mixed waste to develop a treatment plan that includes, in part, a schedule for constructing units to treat those wastes that can be treated using existing technologies. Inherent in constructing treatment units for mixed wastes is, of course, permitting. This paper identifies Federal regulatory program requirements that are likely to apply to new DOE mixed waste treatment units. The paper concentrates on showing how RCRA permitting requirements interrelate with the permitting or licensing requirements of such other laws as the Atomic Energy Act, the Clean Water Act, and the Clean Air Act. Documentation needed to support permit applications under these laws are compared with RCRA permit application documentation. National Environmental Policy Act (NEPA) documentation requirements are also addressed, and throughout the paper, suggestions are made for managing the permitting process

  12. 33 CFR 325.1 - Applications for permits.

    Science.gov (United States)

    2010-07-01

    ... process. Whenever the district engineer becomes aware of planning for work which may require a DA permit... in the basic timing sequence used by the Corps of Engineers in processing applications for DA permits.... Upon receipt of such request, the district engineer will assure the conduct of an orderly process which...

  13. Waste water pilot plant research, development, and demonstration permit application

    International Nuclear Information System (INIS)

    1993-03-01

    This permit application has been prepared to obtain a research, development, and demonstration permit to perform pilot-scale treatability testing on the 242-A Evaporator process condensate waste water effluent stream. It provides the management framework, and controls all the testing conducted in the waste water pilot plant using dangerous waste. It also provides a waste acceptance envelope (upper limits for selected constituents) and details the safety and environmental protection requirements for waste water pilot plant testing. This permit application describes the overall approach to testing and the various components or requirements that are common to all tests. This permit application has been prepared at a sufficient level of detail to establish permit conditions for all waste water pilot plant tests to be conducted

  14. 40 CFR Appendix J to Part 122 - NPDES Permit Testing Requirements for Publicly Owned Treatment Works (§ 122.21(j))

    Science.gov (United States)

    2010-07-01

    ... Publicly Owned Treatment Works (§ 122.21(j)) J Appendix J to Part 122 Protection of Environment... POLLUTANT DISCHARGE ELIMINATION SYSTEM Pt. 122, App. J Appendix J to Part 122—NPDES Permit Testing Requirements for Publicly Owned Treatment Works (§ 122.21(j)) Table 1A—Effluent Parameters for All POTWS...

  15. Hanford facility RCRA permit condition II.U.1 report: mapping of underground piping

    Energy Technology Data Exchange (ETDEWEB)

    Hays, C.B.

    1996-09-27

    The purpose of this report is to fulfill Condition Il.U.1. of the Hanford Facility (HF) Resource Conservation and Recovery Act (RCRA) Permit. The HF RCRA Permit, Number WA7890008967, became effective on September 28, 1994 (Ecology 1994). Permit Conditions Il.U. (mapping) and II.V. (marking) of the HF RCRA Permit, Dangerous Waste (OW) Portion, require the mapping and marking of dangerous waste underground pipelines subject to the provisions of the Washington Administrative Code (WAC) Chapter 173-303. Permit Condition Il.U.I. requires the submittal of a report describing the methodology used to generate pipeline maps and to assure their quality. Though not required by the Permit, this report also documents the approach used for the field marking of dangerous waste underground pipelines.

  16. 75 FR 53708 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-09-01

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  17. 75 FR 69699 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-11-15

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  18. 75 FR 79387 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-12-20

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  19. 76 FR 14424 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-03-16

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  20. 76 FR 70160 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-11-10

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  1. 76 FR 20004 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-04-11

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  2. 75 FR 20857 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-04-21

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  3. 43 CFR 13.4 - Terms of permit.

    Science.gov (United States)

    2010-10-01

    ... § 13.4 Terms of permit. Every permit shall describe the location of the vending facilities and shall be... Interior bureau or office for each location. The head of the Interior bureau or office may require... efficiency as may be prescribed by the head of the Interior bureau or office. Such standards shall conform...

  4. 50 CFR 22.21 - What are the requirements concerning scientific and exhibition purpose permits?

    Science.gov (United States)

    2010-10-01

    ... purposes? (1) You must submit applications for permits to take, possess, or transport within the United... golden eagles, or their parts, nests, or eggs for the scientific or exhibition purposes of public museums, public scientific societies, or public zoological parks. We will not issue a permit under this section...

  5. Permitting plan for project W-236B, initial pretreatment module

    International Nuclear Information System (INIS)

    Tollefson, K.S.

    1995-01-01

    The Tank Waste Remediation System pretreatment process mission is to separate high-level and low-level waste fractions. A comprehensive review of environmental regulations has indicated that several environmental reviews, permits, and approvals are required before construction and operation of the facility. This revised document provides a summary of permit application data requirements, alternative strategies for permit completion and approval, as well as the probability of success for each alternative for the Initial Pretreatment Module resulting from recent revisions to the Tri-Party Agreement

  6. 25 CFR 166.219 - How do I acquire a permit through negotiation?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How do I acquire a permit through negotiation? 166.219 Section 166.219 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GRAZING PERMITS Permit Requirements Obtaining A Permit § 166.219 How do I acquire a permit through negotiation? (a) Permits may be negotiated and granted by th...

  7. 40 CFR 51.165 - Permit requirements.

    Science.gov (United States)

    2010-07-01

    ...; and (2) Shall include emissions associated with startups, shutdowns, and malfunctions; and, for an... data acquisition and availability requirements of this section, to sample, condition (if applicable... the equipment necessary to meet the data acquisition and availability requirements of this section, to...

  8. 25 CFR 161.301 - What will a grazing permit contain?

    Science.gov (United States)

    2010-04-01

    ... permits will contain the following provisions: (1) Name of permit holder; (2) Range management plan...) Animal identification requirements (i.e., brand, microchip, freeze brand, earmark, tattoo, etc.); (6...

  9. Project W-314 phase I environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, for Project W-314 activities in the Hanford Site's Tank Waste Remediation System. This document outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for waste feed delivery to proceed. This document also includes estimated costs and schedule to obtain the required permits and approvals based on the selected strategy. It also provides estimated costs for environmental support during design and construction based on the preliminary project schedule provided

  10. 75 FR 28278 - Endangered Wildlife and Plants; Permits

    Science.gov (United States)

    2010-05-20

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R1-ES-2010-N092; 10120-1113-0000-F5] Endangered Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability of permit applications; request for comments. SUMMARY: In accordance with the requirements of the...

  11. 50 CFR 216.41 - Permits for scientific research and enhancement.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Permits for scientific research and... AND IMPORTING OF MARINE MAMMALS Special Exceptions § 216.41 Permits for scientific research and enhancement. In addition to the requirements under §§ 216.33 through 216.38, permits for scientific research...

  12. 40 CFR 60.4121 - Submission of Hg budget permit applications.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Submission of Hg budget permit... Times for Coal-Fired Electric Steam Generating Units Permits § 60.4121 Submission of Hg budget permit applications. (a) Duty to apply. The Hg designated representative of any Hg Budget source required to have a...

  13. Waste Feed Delivery Environmental Permits and Approvals Plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    2000-01-01

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches

  14. 30 CFR 774.12 - Post-permit issuance information requirements for permittees.

    Science.gov (United States)

    2010-07-01

    ... for permittees. 774.12 Section 774.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL... competent jurisdiction grants a stay of the cessation order and the stay remains in effect. (c) Within 60...

  15. Permit to Work System in Nuclear Malaysia

    International Nuclear Information System (INIS)

    Shyen, A.K.S.; Azwafarina Zarmira Aznan; Md Derus Ibrahim

    2015-01-01

    A Permit-To-Work System is an essential part of the job risk assessment process. An effective Permit-To-Work System would help to prevent accident that usually involves maintenance and construction activities. In Malaysian Nuclear Agency, Radiation Safety and Health Division (BKS) has been given the responsibility to implement the system in order to fulfill the requirement of providing a safe and healthy workplace and environment for its employees as pledged in the Occupational Safety, Health and Environmental Policy. This paper presents the roles and functions of Permit-To-Work System, together with the process flow and challenges ahead. (author)

  16. Factors Influencing Learner Permit Duration

    Directory of Open Access Journals (Sweden)

    Johnathon P. Ehsani

    2016-12-01

    Full Text Available An increasing number of countries are requiring an extended learner permit prior to independent driving. The question of when drivers begin the learner permit period, and how long they hold the permit before advancing to independent licensure has received little research attention. Licensure timing is likely to be related to “push” and “pull” factors which may encourage or inhibit the process. To examine this question, we recruited a sample of 90 novice drivers (49 females and 41 males, average age of 15.6 years soon after they obtained a learner permit and instrumented their vehicles to collect a range of driving data. Participants completed a series of surveys at recruitment related to factors that may influence licensure timing. Two distinct findings emerged from the time-to-event analysis that tested these push and pull factors in relation to licensure timing. The first can be conceptualized as teens’ motivation to drive (push, reflected in a younger age when obtaining a learner permit and extensive pre-permit driving experience. The second finding was teens’ perceptions of their parents’ knowledge of their activities (pull; a proxy for a parents’ attentiveness to their teens’ lives. Teens who reported higher levels of their parents’ knowledge of their activities took longer to advance to independent driving. These findings suggest time-to-licensure may be related to teens’ internal motivation to drive, and the ability of parents to facilitate or impede early licensure.

  17. Waste Feed Delivery Environmental Permits and Approvals Plan

    Energy Technology Data Exchange (ETDEWEB)

    TOLLEFSON, K.S.

    2000-01-18

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches.

  18. 78 FR 59728 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2013-09-27

    ... requiring special protection. The regulations establish such a permit system to designate Antarctic... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic... Foundation (NSF) is required to publish a notice of permit applications received to conduct activities...

  19. Hanford facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-01-01

    This document, Set 2, the Hanford Facility Dangerous Waste Part B Permit Application, consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 CFR 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of WAC 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. This permit application contains ''umbrella- type'' documentation with overall application to the Hanford Facility. This documentation is broad in nature and applies to all TSD units that have final status under the Hanford Facility Permit

  20. 36 CFR 228.54 - Single entry sales or permits.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Single entry sales or permits... MINERALS Disposal of Mineral Materials General Provisions § 228.54 Single entry sales or permits. The... plan which describes operating procedures and reclamation measures, unless the requirement is waived by...

  1. 25 CFR 166.223 - Can I use a permit as collateral for a loan?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can I use a permit as collateral for a loan? 166.223... PERMITS Permit Requirements Permit (leasehold) Mortgage § 166.223 Can I use a permit as collateral for a loan? We may approve a permit containing a provision that authorizes the permittee to encumber the...

  2. 40 CFR 70.8 - Permit review by EPA and affected States.

    Science.gov (United States)

    2010-07-01

    ... compatible with EPA's national database management system. (2) The Administrator may waive the requirements... PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS § 70.8 Permit review by EPA and affected States. (a...

  3. Hazardous waste incinerator permitting in Texas from inception to operation

    International Nuclear Information System (INIS)

    Simms, M.D.; McDonnell, R.G. III

    1991-01-01

    The regulatory permitting process for hazardous waste incinerators i a long and arduous proposition requiring a well-developed overall strategy. In Texas, RCRA permits for the operation of hazardous waste incinerator facilities are issued through the federally delegated Texas Water Commission (TWC). While the TWC has primacy in the issuance of RCRA permits for hazardous waste incinerators, the Texas Air Control Board (TACB) provides a significant portion of the Part B application review and provides much of the permit language. In addition to dealing with regulatory agencies, RCRA permitting provides by significant public involvement. Often the lack of public support becomes a major roadblock for an incinerator project. In order to establish an effective strategy which addresses the concerns of regulatory agencies and the public, it is important to have an understanding of the steps involved in obtaining a permit. A permit applicant seeking to construct a new hazardous waste incinerator can expect to go through a preapplication meeting with government regulators, a site selection process, file an application, respond to calls for additional technical information from both the TACB and the TWC, defend the application in a hearing, have a recommendation from a TWC hearing examiner and, finally, receive a determination from the TWC's Commissioners. Presuming a favorable response from the Commission, the permittee will be granted a trial burn permit and may proceed with the construction, certification and execution of a trial burn at the facility. Subsequent to publication of the trial burn results and approval by the TWC, the permittee will possess an operational hazardous waste incinerator permit. The paper describes the major steps required to receive an operational permit for a hazardous waste incinerator in the State of Texas. Important issues involved in each step will be discussed including insights gained from recent incinerator permitting efforts

  4. Transportation of Large Wind Components: A Permitting and Regulatory Review

    Energy Technology Data Exchange (ETDEWEB)

    Levine, Aaron [National Renewable Energy Lab. (NREL), Golden, CO (United States); Cook, Jeff [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-09-01

    This report summarizes permitting and regulatory issues associated with transporting wind turbine blades, towers, and nacelles as well as large transformers (wind components). These wind components are commonly categorized as oversized and overweight (OSOW) and require specific permit approvals from state and local jurisdictions. The report was developed based on a Quadrennial Energy Review (QER) recommendation on logistical requirements for the transportation of 'oversized or high-consequence energy materials, equipment, and components.'

  5. Project W-521, waste feed delivery systems environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document has been prepared to define the specific environmental requirements applicable to Project W-521. The document describes the permits and approvals necessary for the project to design, construct, and install planned upgrades, and provides a schedule of activities and provides cost estimates to complete the required permitting and approval activities

  6. Permitting plan for the high-level waste interim storage

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1997-01-01

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist

  7. Should advertising by aesthetic surgeons be permitted?

    Directory of Open Access Journals (Sweden)

    Neeraj Nagpal

    2017-01-01

    Full Text Available Cosmetic, aesthetic and cutaneous surgical procedures require qualified specialists trained in the various procedures and competent to handle complications. However, it also requires huge investments in terms of infrastructure, trained staff and equipment. To be viable advertising is essential to any establishment which provides cosmetic and aesthetic procedures. Business men with deep pockets establish beauty chains which also provide these services and advertise heavily to sway public opinion in their favour. However, these saloons and spas lack basic medical facilities in terms of staff or equipment to handle any complication or medical emergency. To have a level playing field ethical advertising should be permitted to qualified aesthetic surgeons as is permitted in the US and UK by their respective organisations.

  8. Annual Hanford Site environmental permitting status report

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1998-01-01

    The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, 'best efforts' means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for

  9. Air Permitting Implications of a Biorefinery Producing Raw Bio-Oil in Comparison with Producing Gasoline and Diesel Blendstocks

    Energy Technology Data Exchange (ETDEWEB)

    Bhatt, Arpit H [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Zhang, Yi Min [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-02-01

    A biorefinery, considered a chemical process plant under the Clean Air Act permitting program, could be classified as a major or minor source based on the size of the facility and magnitude of regulated pollutants emitted. Our previous analysis indicates that a biorefinery using fast pyrolysis conversion process to produce finished gasoline and diesel blendstocks with a capacity of processing 2,000 dry metric tons of biomass per day would likely be classified as a major source because several regulated pollutants (such as particulate matter, sulfur dioxide, nitrogen oxide) are estimated to exceed the 100 tons per year (tpy) major source threshold, applicable to chemical process plants. Being subject to a major source classification could pose additional challenges associated with obtaining an air permit in a timely manner before the biorefinery can start its construction. Recent developments propose an alternative approach to utilize bio-oil produced via the fast pyrolysis conversion process by shipping it to an existing petroleum refinery, where the raw bio-oil can be blended with petroleum-based feedstocks (e.g., vacuum gas oil) to produce gasoline and diesel blendstocks with renewable content. Without having to hydro-treat raw bio-oil, a biorefinery is likely to reduce its potential-to-emit to below the 100 tpy major source threshold, and therefore expedite its permitting process. We compare the PTE estimates for the two biorefinery designs with and without hydrotreating of bio-oils and examine the air permitting implications on potential air permit classification and discuss the best available control technology requirements for the major source biorefinery utilizing hydrotreating operation. Our analysis is expected to provide useful information to new biofuel project developers to identify opportunities to overcome challenges associated with air permitting.

  10. 50 CFR 23.36 - What are the requirements for an export permit?

    Science.gov (United States)

    2010-10-01

    ... IMPORTATION OF WILDLIFE AND PLANTS (CONTINUED) CONVENTION ON INTERNATIONAL TRADE IN ENDANGERED SPECIES OF WILD... agreement. (b) U.S. application forms. Complete the appropriate form for the proposed activity and submit it... certain ports or regional offices: Type of application for an export permit Form no. (1) CITES:American...

  11. 9 CFR 82.24 - Other interstate movements and special permits.

    Science.gov (United States)

    2010-01-01

    ... issued, and the special conditions under which the interstate movement, or cleaning and disinfection, may...; and (iv) The reason for the interstate movement. (2) For cleaning and disinfection, the special permit... prescribed by this subpart. A special permit is required for the disinfection of vehicles, premises, cages...

  12. Coordinating Permit Offices and the Development of Utility-Scale Geothermal Energy (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Levine, A.; Young, K.; Witherbee, K.

    2013-10-01

    Permitting is a major component of the geothermal development process. Better coordination across government agencies could reduce uncertainty of the process and the actual time of permitting. This presentation highlights various forms of coordinating permit offices at the state and federal level in the western United States, discusses inefficiencies and mitigation techniques for permitting natural resource projects, analyzes whether various approaches are easily adaptable to utility-scale geothermal development, and addresses advantages and challenges for coordinating permit offices. Key successful strategies identified include: 1. Flexibility in implementing the approach (i.e. less statutory requirements for the approach); 2. Less dependence on a final environmental review for information sharing and permit coordination; 3. State and federal partnerships developed through memorandum of understanding to define roles and share data and/or developer information. A few of the most helpful techniques include: 1. A central point of contact for the developer to ask questions surrounding the project; 2. Pre-application meetings to assist the developer in identifying all of the permits, regulatory approvals, and associated information or data required; 3. A permit schedule or timeline to set expectations for the developer and agencies; 4. Consolidating the public notice, comment, and hearing period into fewer hearings held concurrently.

  13. Permissible state permit/fee systems for radioactive materials transportation

    International Nuclear Information System (INIS)

    Friel, L.

    1987-01-01

    Many state permit/fee systems for radioactive materials transportation have been ruled inconsistent with federal law invalidated by the courts. As the date for repository operation, and its associated transportation, draws near, more states can be expected to adopt permit/fee systems. Examination of the U.S. Department of Transportation's advisory rulings and federal court cases on previous permit/fee systems gives general guidance on the type of permit/fee systems most likely to withstand challenges. Such a system would: have a simplified permit application with minimal information requirements; address a federally-defined class of hazardous or radioactive materials; allow access to all shipments conducted in compliance with federal law; charge a fee reasonably related to the costs imposed on the state by the transportation; and minimize the potential for re-directing shipments to other jurisdictions

  14. 77 FR 12286 - Final National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater...

    Science.gov (United States)

    2012-02-29

    ..., pollution prevention, water quality-based requirements, inspections, corrective action, and permit... industry on December 1, 2009. The permit also includes new water quality-based requirements for... Mexico, Indian Country Lands, Puerto Rico, Washington, DC, and U.S. territories and protectorates. DATES...

  15. Wigner's infinite spin representations and inert matter

    Energy Technology Data Exchange (ETDEWEB)

    Schroer, Bert [CBPF, Rio de Janeiro (Brazil); Institut fuer Theoretische Physik FU-Berlin, Berlin (Germany)

    2017-06-15

    Positive energy ray representations of the Poincare group are naturally subdivided into three classes according to their mass and spin content: m > 0, m = 0 finite helicity and m = 0 infinite spin. For a long time the localization properties of the massless infinite spin class remained unknown, until it became clear that such matter does not permit compact spacetime localization and its generating covariant fields are localized on semi-infinite space-like strings. Using a new perturbation theory for higher spin fields we present arguments which support the idea that infinite spin matter cannot interact with normal matter and we formulate conditions under which this also could happen for finite spin s > 1 fields. This raises the question of a possible connection between inert matter and dark matter. (orig.)

  16. 78 FR 5451 - Federal Acquisition Regulation; Submission for OMB Review; Permits, Authorities, or Franchises

    Science.gov (United States)

    2013-01-25

    ...; Submission for OMB Review; Permits, Authorities, or Franchises AGENCIES: Department of Defense (DOD), General... approved information collection requirement concerning permits, authorities, or franchises for regulated..., Permits, Authorities, or Franchises, by any of the following methods: Regulations.gov : http://www...

  17. Double-shell tank system dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-06-01

    This Double-Shell Tank System Dangerous Waste Permit Application should be read in conjunction with the 242-A Evaporator Dangerous Waste Permit Application and the Liquid Effluent Retention Facility Dangerous Waste Permit Application, also submitted on June 28, 1991. Information contained in the Double-Shell Tank System permit application is referenced in the other two permit applications. The Double-Shell Tank System stores and treats mixed waste received from a variety of sources on the Hanford Site. The 242-A Evaporator treats liquid mixed waste received from the double-shell tanks. The 242-A Evaporator returns a mixed-waste slurry to the double-shell tanks and generates the dilute mixed-waste stream stored in the Liquid Effluent Retention Facility. This report contains information on the following topics: Facility Description and General Provisions; Waste Characteristics; Process Information; Groundwater Monitoring; Procedures to Prevent Hazards; Contingency Plan; Personnel Training; Exposure Information Report; Waste Minimization Plan; Closure and Postclosure Requirements; Reporting and Recordkeeping; other Relevant Laws; and Certification. 150 refs., 141 figs., 118 tabs

  18. CERN CERTIFICATE REQUIRED FOR AN APPLICATION FOR A FRENCH RESIDENCE PERMIT ISSUED BY A PREFECTURE

    CERN Multimedia

    Relations with the Host States Service

    2001-01-01

    All non-French nationals who reside in France for more than three consecutive months or who, in the case of intermittent periods of residence, are effectively present in France for more than three months in any six-month period must obtain a residence or stay permit (titre de séjour). If members of the CERN personnel and members of their families fulfil those conditions inter alia, they normally receive a legitimation document, which is valid as a residence or stay permit, from the French Ministry of Foreign Affairs (Carte spéciale FI or AT, Carte d'assimilé à un membre de mission diplomatique). However, members of the personnel with permanent resident status (résident permanent) are not, by virtue of that status, entitled to a legitimation document and must obtain a residence permit issued by a Prefecture. For the latter purpose, with the agreement of the Prefecture de l'Ain, CERN (i.e. the Personnel Records Office, Human Resources Division, office 33/1-...

  19. 77 FR 49484 - Notice of Delays in Processing of Special Permits Applications

    Science.gov (United States)

    2012-08-16

    ... the requirements of 49 U.S.C. 5117(c), PHMSA is publishing the following list of special permit..., UT. Party to Special Permits Application 15537-P Austin Powder 4 10-31-2012 Company, Cleveland, OH...

  20. Emissions Inventory Report Summary: Reporting Requirements for the New Mexico Administrative code, Title 20, Chapter 2, Part 73 (20 NMAC 2.73) for Calendar Year 1997

    International Nuclear Information System (INIS)

    1999-01-01

    Los Alamos National Laboratory (the Laboratory) is subject to emissions reporting requirements for regulated air contaminants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73, (20 NMAC 2.73), Notice of Intent and Emissions Inventory Requirements. The Laboratory has the potential to emit 100 tons per year of suspended particulate matter (PM), nitrogen oxides (NO x ), carbon monoxide (CO), and volatile organic compounds (VOCs). For 1997, combustion products from the industrial sources contributed the greatest amount of regulated air emissions from the Laboratory. Research and development activities contributed the greatest amount of VOCs. Emissions of beryllium and aluminum were reported for activities permitted under 20 NMAC 2.72, Construction Permits

  1. 40 CFR 70.5 - Permit applications.

    Science.gov (United States)

    2010-07-01

    ... establish. Where an existing part 70 permit would prohibit such construction or change in operation, the... information only if it is related to the proposed change. Information required under paragraph (c) of this... part shall state that, based on information and belief formed after reasonable inquiry, the statements...

  2. 25 CFR 166.220 - What are the basic steps for acquiring a permit through negotiation?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What are the basic steps for acquiring a permit through negotiation? 166.220 Section 166.220 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GRAZING PERMITS Permit Requirements Obtaining A Permit § 166.220 What are the basic steps for acquiring a permit through negotiation? The...

  3. 77 FR 55475 - Federal Acquisition Regulation; Information Collection; Permits, Authorities, or Franchises

    Science.gov (United States)

    2012-09-10

    ...; Information Collection; Permits, Authorities, or Franchises AGENCY: Department of Defense (DOD), General... approved information collection requirement concerning permits, authorities, or franchises for regulated..., Authorities, or Franchises, by any of the following methods: Regulations.gov : http://www.regulations.gov...

  4. 78 FR 21938 - Final National Pollutant Discharge Elimination System (NPDES) General Permit for Discharges...

    Science.gov (United States)

    2013-04-12

    ... vessel are inspected for permit compliance. If the vessel is placed in dry dock while covered under the permit, a dry dock inspection and report is required to be completed. Additional monitoring requirements... controlled arrangements in port, or at drydock; when feasible and safe, vessels must use ballast water pumps...

  5. Action for declaration of annulment of reactor construction permit dismissed

    International Nuclear Information System (INIS)

    Anon.

    1982-01-01

    The Higher Administrative Court of Rheinland Pfalz has confirmed two decisions by the Koblenz Administrative Court dismissing an actions to declare the annulment of the partial construction permit issued for the Muelheim-Kaerlich reactor. Appeal was not admitted. The plaintiffs, who are under age and were represented by their father, are permanently resident in Schleswig-Holstein, at about 470 km from the site and have a further residence in Mainz, about 60 km away from the site. They plead to have a legitimate interest in the declaration of nullity on the grounds of the uncertainty created in legal matters by the delivery of the permit and its being unconstitutional as well as for ideological and religious reasons. The ruling deals also with the importance of the distance from the site of a nuclear reactor, which is considered to be such as to exclude the 'necessary spatial relation'. (orig./HP) [de

  6. Air permitting of IGCC plants

    Energy Technology Data Exchange (ETDEWEB)

    Chitikela, S.R.

    2007-07-01

    The IGCC process is, currently, the preferred choice over conventional thermal power production in regard to cleanup of fuel and significantly reduced contaminant emissions. The air permitting requirements include the review of: feed preparation and PM emissions; feed gasification and contaminant emissions; elemental sulfur recovery and SO{sub 2} emissions; options for carbon-dioxide recovery; syngas characteristics for combustion; CT design and combustion mechanisms; air contaminant emissions of CT; controlled CT emissions of nitrogen-oxides and carbon-monoxide gases using the SCR and oxidation catalysts, respectively; and, emission of volatile organic compounds (VOCs), and hazardous air pollutants (HAPs). However, the IGCC processes are being rigorously reviewed for the system integration and reliability, and significant reduction of air contaminant emissions (including the greenhouse gases). This paper included a review of IGCC air contaminant emission rates, and various applicable regulatory requirements, such as NSR (New Source Review), NSPS (New Source Performance Standards), and MACT (Maximum Achievable Control Technology). The IGCC facility's NOX, CO, SO{sub 2}, PM, VOCs, and HAPs emission rates would be significantly low. Thus, effective, construction and installation, and operation air permits would be necessary for IGCC facilities.

  7. 78 FR 56744 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2013-09-13

    ... requiring special protection. The regulations establish such a permit system to designate Antarctic... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of Permit Applications Received...

  8. 77 FR 38834 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2012-06-29

    ... requiring special protection. The regulations establish such a permit system to designate Antarctic... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of permit applications received...

  9. National Pollutant Discharge Elimination System (NPDES) Permit Application Requirement for Storm Water Discharges

    Science.gov (United States)

    1991-05-01

    ee40 CFR Subchap- ter N to determine which polutants are likhd in effluent guidelines) or any pollutant rsted in the faci 14’s NPDES permit for its...Giease Phosphorus. Total Radioactivity Sulfate Sulfide Sutfite Surfactants Aluminum, Total Barium. Total Boron. Total Cobalt. Total liron. Total Magnesium

  10. Development and application of a permit information system for shale oil (PERMISSO). Final report appendix: summary sheets of regulations required for oil shale development, June 1978--May 1979

    Energy Technology Data Exchange (ETDEWEB)

    1979-07-01

    This appendix is comprised of summaries of various governmental permits, licenses and other approvals required for oil shale development. The summaries were completed during the period June--October 1978, and are current as of July 1, 1978, although more recent authority was cited in some cases. One of the major purposes of Phase II of the project will be to update these summaries as statutes and regulations are added, changed or eliminated. This updating will be particularly important in the case of environmental permits and approvals. Many legislative and regulatory changes affecting environmental requirements are pending at this time and will alter many of the summaries herein. In addition, many regulatory proposals have been or likely will be challenged in the courts. When such conflicts are resolved further changes may be in order.

  11. RCRA permit modifications and the functional equivalency demonstration: A case study

    International Nuclear Information System (INIS)

    Kinker, J.; Lyon, W.; Carnes, R.; Loehr, C.; Elsberry, K.; Garcia, P.

    1996-01-01

    Hazardous waste operating permits issued under the Resource Conservation and Recovery Act (RCRA) often impose requirements, typically by reference to the original permit application, that specific components and equipment be used. Consequently, changing these items, even for the purpose of routine maintenance, may first require that the owner/operator request a potentially time-consuming and costly permit modification. However, the owner/operator may demonstrate that a modification is not required because the planned changes are functionally equivalent, as defined by RCRA, to the original specifications embodied by the permit. The Controlled-Air Incinerator at Los Alamos National Laboratory is scheduled for maintenance and improvements that involve replacement of components. The incinerator's carbon adsorption unit/high efficiency particulate air filtration system, in particular, was redesigned to improve reliability and minimize maintenance. A study was performed to determine whether the redesigned unit would qualify as functionally equivalent to the original component. in performing this study, the following steps were taken: (a) the key performance factors were identified; (b) performance data describing the existing unit were obtained; (c) performance of both the existing and redesigned units was simulated; and (d) the performance data were compared to ascertain whether the components could qualify as functionally equivalent

  12. The Effect of Emission Permits and Pigouvian Taxes on Market Structure

    Energy Technology Data Exchange (ETDEWEB)

    Bunuel, M.

    2001-07-01

    Differently from Pigouvian taxes and direct regulation, tradable emission permits can decrease competition in a polluting industry under certain circumstances. Assume a potential entrant who can buy every permit. When permits are given free to current polluters, monopolization occurs if not every polluter foresees it. If foreseen, polluters want to free ride on the entrant's market power, but entry can still occur, although not with certainty. Considering a symmetric, mixed-strategy equilibrium with unconditional bids, the probability of entry decreases as the number of polluters increase. When permits are sold initially, monopolization occurs without more requirements than polluters being financially constrained. (Author)

  13. Waste feed delivery environmental permits and approvals plan

    International Nuclear Information System (INIS)

    Papp, I.G.

    1998-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, that may affect waste feed delivery (WFD) activities in the Hanford Site's Tank Waste Remediation System (TWRS). This plan expands on the summary level information in the Tank Waste Remediation System Environmental Program Plan (HNF 1773) to address requirements that are most pertinent to WFD. This plan outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for WFD to proceed. Appendices at the end of this plan provide preliminary cost and schedule estimates for implementing the selected strategies. The rest of this section summarizes the scope of WFD activities, including important TWRS operating information, and describes in more detail the objectives, structure, and content of this plan

  14. Onshore permitting systems analysis for coal, oil, gas, geothermal and oil shale leases. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-09-01

    The magnitude and complexity of permit processes raises a question as to their impact on the rate and scope of industrial development activity. One particular area where this issue is of concern is in new energy extraction and development activities. The initiation of new energy projects has been a national priority for several years. But, energy projects, because of their potential for creating land disturbances, are subject to many environmental and other regulations. Because of this, the permitting required of energy resource developers is extensive. Within the energy field, a major portion of development activities occurs on federal lands. This is particularly true in the Rocky Mountain states and Alaska where the principal landholder is the federal government. The permitting requirements for federal lands' development differ from those for private lands. This report assesses the impact of permitting processes for energy resource development on federal lands. The permitting processes covered include all of the major environmental, land-use, and safety permits required by agencies of federal and state governments. The lands covered include all federal lands, with emphasis on eight states with major development activities.

  15. Designing eHealth that Matters via a Multidisciplinary Requirements Development Approach.

    Science.gov (United States)

    Van Velsen, Lex; Wentzel, Jobke; Van Gemert-Pijnen, Julia Ewc

    2013-06-24

    Requirements development is a crucial part of eHealth design. It entails all the activities devoted to requirements identification, the communication of requirements to other developers, and their evaluation. Currently, a requirements development approach geared towards the specifics of the eHealth domain is lacking. This is likely to result in a mismatch between the developed technology and end user characteristics, physical surroundings, and the organizational context of use. It also makes it hard to judge the quality of eHealth design, since it makes it difficult to gear evaluations of eHealth to the main goals it is supposed to serve. In order to facilitate the creation of eHealth that matters, we present a practical, multidisciplinary requirements development approach which is embedded in a holistic design approach for eHealth (the Center for eHealth Research roadmap) that incorporates both human-centered design and business modeling. Our requirements development approach consists of five phases. In the first, preparatory, phase the project team is composed and the overall goal(s) of the eHealth intervention are decided upon. Second, primary end users and other stakeholders are identified by means of audience segmentation techniques and our stakeholder identification method. Third, the designated context of use is mapped and end users are profiled by means of requirements elicitation methods (eg, interviews, focus groups, or observations). Fourth, stakeholder values and eHealth intervention requirements are distilled from data transcripts, which leads to phase five, in which requirements are communicated to other developers using a requirements notation template we developed specifically for the context of eHealth technologies. The end result of our requirements development approach for eHealth interventions is a design document which includes functional and non-functional requirements, a list of stakeholder values, and end user profiles in the form of

  16. WIPP's Hazardous Waste Facility Permit Renewal Application

    International Nuclear Information System (INIS)

    Most, W.A.; Kehrman, R.F.

    2009-01-01

    Renewal Application. As none of the proposed changes requested in the Renewal Application are substantial, a streamlined submittal package is being prepared while adequately addressing all necessary regulatory information requirements. Changes that could enhance the Permit the Permittees are addressing by Class 1 and Class 2 permit modifications prior to submittal of the Renewal Application. (authors)

  17. 75 FR 26268 - Agency Information Collection Activities: Permit To Transfer Containers to a Container Station

    Science.gov (United States)

    2010-05-11

    ... Activities: Permit To Transfer Containers to a Container Station AGENCY: U.S. Customs and Border Protection... information collection requirement concerning the: Permit to Transfer Containers to a Container Station. This... information collection: Title: Permit to Transfer Containers to a Container Station. OMB Number: 1651-0049...

  18. 50 CFR 679.84 - Rockfish Program recordkeeping, permits, monitoring, and catch accounting.

    Science.gov (United States)

    2010-10-01

    ..., monitoring, and catch accounting. 679.84 Section 679.84 Wildlife and Fisheries FISHERY CONSERVATION AND..., permits, monitoring, and catch accounting. (a) Recordkeeping and reporting. See § 679.5(r). (b) Permits... cooperative or rockfish limited access fishery. The requirements under paragraphs (c)(1) through (9) of this...

  19. The European Union's potential for strategic emissions trading through permit sales contracts

    International Nuclear Information System (INIS)

    Eyckmans, Johan; Hagem, Cathrine

    2011-01-01

    Strategic market behavior by permit sellers will harm the European Union (EU) as it is expected to become a large net buyer of permits in a follow-up agreement to the Kyoto Protocol. In this paper, we explore how the EU could benefit from making permit trade agreements with non-EU countries. These trade agreements involve permit sales requirement, complemented by a financial transfer from the EU to the other contract party. Such agreements would enable the EU to act strategically in the permit market on behalf of its member states, although each member state is assumed to behave as a price taker in the permit market. Using a stylized numerical simulation model, we show that an appropriately designed permit trade agreement between the EU and China could significantly cut the EU's total compliance cost. This result is robust for a wide range of parameterizations of the simulation model. (author)

  20. Environmental Restoration Contractor Resource Conservation and Recovery Act Permit Implementation Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1996-05-01

    This document contains the revised Environmental Restoration Contractor (ERC) Implementation Plan for compliance with the Dangerous Waste and Hazardous and Solid Waste Amendment portions of the Resource Conservation and Recovery Act (RCRA) Permit for the Treatment, Storage, and Disposal of Dangerous Waste (hereafter referred to as the open-quotes Permitclose quotes). The Permit became effective on September 28, 1994. The ERC has developed the Permit Implementation Plan to ensure that the Permit is properly implemented within the ERC project and functions. The plan contains a list of applicable permit conditions, descriptions, responsible organizations, and the status of compliance. The ERC's responsibilities for Permit implementation are identified within both project and functional organizations. Project Managers are responsible for complying with conditions specific to a particular treatment, storage, or disposal (TSD) unit. TSD-specific compliance in include items such as closure plan deliverables, reporting and record keeping requirements, or compliance with non-unit-specific tasks such as spill reporting and emergency response. Functional organizations are responsible for sitewide activities, such as coordinating Permit modifications and developing personnel training programs

  1. Establishment of Requirements and Methodology for the Development and Implementation of GreyMatters, a Memory Clinic Information System.

    Science.gov (United States)

    Tapuria, Archana; Evans, Matt; Curcin, Vasa; Austin, Tony; Lea, Nathan; Kalra, Dipak

    2017-01-01

    The aim of the paper is to establish the requirements and methodology for the development process of GreyMatters, a memory clinic system, outlining the conceptual, practical, technical and ethical challenges, and the experiences of capturing clinical and research oriented data along with the implementation of the system. The methodology for development of the information system involved phases of requirements gathering, modeling and prototype creation, and 'bench testing' the prototype with experts. The standard Institute of Electrical and Electronics Engineers (IEEE) recommended approach for the specifications of software requirements was adopted. An electronic health record (EHR) standard, EN13606 was used, and clinical modelling was done through archetypes and the project complied with data protection and privacy legislation. The requirements for GreyMatters were established. Though the initial development was complex, the requirements, methodology and standards adopted made the construction, deployment, adoption and population of a memory clinic and research database feasible. The electronic patient data including the assessment scales provides a rich source of objective data for audits and research and to establish study feasibility and identify potential participants for the clinical trials. The establishment of requirements and methodology, addressing issues of data security and confidentiality, future data compatibility and interoperability and medico-legal aspects such as access controls and audit trails, led to a robust and useful system. The evaluation supports that the system is an acceptable tool for clinical, administrative, and research use and forms a useful part of the wider information architecture.

  2. Legal Review: Issuance of Separate Permits for a Nuclear Reactor for Research

    International Nuclear Information System (INIS)

    Chang, Gun-Hyun; Kim, Sang-Wwon; Koh, Jae-Dong; Kim, Chang-Bum; Ahn, Sang-kyu

    2006-01-01

    With regard to the nuclear reactor permission system under the Atomic Energy Act of the Republic of Korea, two types of permits must be obtained for nuclear power reactors under Article 11 and Article 21 of the Atomic Energy Act: construction permits and operation permits. Concerning nuclear reactors for research, however, only one permit is required: a dual permit that authorizes both construction and operation, under Article 33 of said act. This permit can be obtained by submitting an application for a dual construction and operation permit to the regulatory authority. The question is whether a dual permit can be issued for nuclear reactors for research under any circumstances. If the literal provisions of the Atomic Energy Act are applied rigorously even in cases where it is realistically difficult to submit a dual permit application or issue a dual permit for construction and operation considering the power output, usage, and design complexity of nuclear reactors for research, separate permits for construction or operation shall never be issued, with only dual permits for construction and operation issued. For the Hanaro research reactor, a dual permit was issued with a condition attached thereto based on the literal provisions of the Atomic Energy Act at the time of its construction, although an application for and issuance of a dual permit for its construction and operation were impossible at the time. This is in violation of the purport of the law that provides for a dual permit

  3. 40 CFR 122.28 - General permits (applicable to State NPDES programs, see § 123.25).

    Science.gov (United States)

    2010-07-01

    ... ELIMINATION SYSTEM Permit Application and Special NPDES Program Requirements § 122.28 General permits... 40 Protection of Environment 21 2010-07-01 2010-07-01 false General permits (applicable to State NPDES programs, see § 123.25). 122.28 Section 122.28 Protection of Environment ENVIRONMENTAL PROTECTION...

  4. State waste discharge permit application: Hydrotest, maintenance and construction discharges. Revision 0

    International Nuclear Information System (INIS)

    1995-11-01

    On December 23, 1991, the US DOE< Richland Operation Office (RL) and the Washington State Department of Ecology (Ecology) agreed to adhere to the provisions of the Department of Ecology Consent Order No. DE91NM-177 (216 Consent Order) (Ecology and US DOE 1991). The 216 Consent Order list regulatory milestones for liquid effluent streams at the Hanford Site and requires compliance with the permitting requirements of Washington Administrative Code. Hanford Site liquid effluent streams discharging to the soil column have been categorized on the 216 Consent Order as follows: Phase I Streams; Phase II Streams; Miscellaneous Streams. Phase I and Phase II Streams were initially addressed in two report. Miscellaneous Streams are subject to the requirements of several milestones identified in the 216 Consent Order. This document constitutes the Categorical State Waste Discharge Permit application for hydrotest,maintenance and construction discharges throughout the Hanford Site. This categorical permit application form was prepared and approved by Ecology

  5. State waste discharge permit application: Hydrotest, maintenance and construction discharges. Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    On December 23, 1991, the US DOE< Richland Operation Office (RL) and the Washington State Department of Ecology (Ecology) agreed to adhere to the provisions of the Department of Ecology Consent Order No. DE91NM-177 (216 Consent Order) (Ecology and US DOE 1991). The 216 Consent Order list regulatory milestones for liquid effluent streams at the Hanford Site and requires compliance with the permitting requirements of Washington Administrative Code. Hanford Site liquid effluent streams discharging to the soil column have been categorized on the 216 Consent Order as follows: Phase I Streams; Phase II Streams; Miscellaneous Streams. Phase I and Phase II Streams were initially addressed in two report. Miscellaneous Streams are subject to the requirements of several milestones identified in the 216 Consent Order. This document constitutes the Categorical State Waste Discharge Permit application for hydrotest,maintenance and construction discharges throughout the Hanford Site. This categorical permit application form was prepared and approved by Ecology.

  6. Cooperative Emissions Trading Game: International Permit Market Dominated by Buyers.

    Science.gov (United States)

    Honjo, Keita

    2015-01-01

    Rapid reduction of anthropogenic greenhouse gas emissions is required to mitigate disastrous impacts of climate change. The Kyoto Protocol introduced international emissions trading (IET) to accelerate the reduction of carbon dioxide (CO2) emissions. The IET controls CO2 emissions through the allocation of marketable emission permits to sovereign countries. The costs for acquiring additional permits provide buyers with an incentive to reduce their CO2 emissions. However, permit price has declined to a low level during the first commitment period (CP1). The downward trend in permit price is attributed to deficiencies of the Kyoto Protocol: weak compliance enforcement, the generous allocation of permits to transition economies (hot air), and the withdrawal of the US. These deficiencies created a buyer's market dominated by price-making buyers. In this paper, I develop a coalitional game of the IET, and demonstrate that permit buyers have dominant bargaining power. In my model, called cooperative emissions trading (CET) game, a buyer purchases permits from sellers only if the buyer forms a coalition with the sellers. Permit price is determined by bargaining among the coalition members. I evaluated the demand-side and supply-side bargaining power (DBP and SBP) using Shapley value, and obtained the following results: (1) Permit price is given by the product of the buyer's willingness-to-pay and the SBP (= 1 - DBP). (2) The DBP is greater than or equal to the SBP. These results indicate that buyers can suppress permit price to low levels through bargaining. The deficiencies of the Kyoto Protocol enhance the DBP, and contribute to the demand-side dominance in the international permit market.

  7. 77 FR 22267 - Eagle Permits; Changes in the Regulations Governing Eagle Permitting

    Science.gov (United States)

    2012-04-13

    ... with rotating wind turbines. Permit Duration and Transferability In February 2011, we published draft... permit applicants, because of the known risk to eagles from collisions with wind turbines and electric... change does not affect the tenure of any other migratory bird or eagle permit type. DATES: Electronic...

  8. Resource Conservation and Recovery Act: Part B, Permit application

    International Nuclear Information System (INIS)

    1992-03-01

    This report contains information related to the permit application for the WIPP facility. Information is presented on solid waste management; personnel safety; emergency plans; site characterization; applicable regulations; decommissioning; and ground water monitoring requirements

  9. 50 CFR 13.21 - Issuance of permits.

    Science.gov (United States)

    2010-10-01

    ... material information required, or has made false statements as to any material fact, in connection with his... disqualification has been expressly waived by the Director in response to a written petition. (2) The revocation of..., as well as any other conditions deemed appropriate and included on the face of the permit at the...

  10. 50 CFR 679.4 - Permits.

    Science.gov (United States)

    2010-10-01

    ... this section, with the exception that an IFQ hired master permit or a CDQ hired master permit need not... program permit or card type is: Permit is in effect from issue date through the end of: For more... section (C) Halibut & sablefish hired master permits Specified fishing year Paragraph (d)(2) of this...

  11. White matter microstructure in transsexuals and controls investigated by diffusion tensor imaging

    NARCIS (Netherlands)

    Kranz, Georg S; Hahn, Andreas; Kaufmann, Ulrike; Küblböck, Martin; Hummer, Allan; Ganger, Sebastian; Seiger, Rene; Winkler, Dietmar; Swaab, Dick F; Windischberger, Christian; Kasper, Siegfried; Lanzenberger, Rupert

    2014-01-01

    Biological causes underpinning the well known gender dimorphisms in human behavior, cognition, and emotion have received increased attention in recent years. The advent of diffusion-weighted magnetic resonance imaging has permitted the investigation of the white matter microstructure in

  12. State Licenses & Permits

    Data.gov (United States)

    Small Business Administration — Starting a business? Confused about whether you need a business license or permit? Virtually every business needs some form of license or permit to operate legally....

  13. Potable Water Treatment Facility General Permit (PWTF GP) ...

    Science.gov (United States)

    2017-08-28

    The Final PWTF GP establishes permit eligibility conditions, Notice of Intent (NOI) requirements, effluent limitations, standards, prohibitions, and best management practices for facilities that discharge to waters in the Commonwealth of Massachusetts (including both Commonwealth and Indian country lands) and the State of New Hampshire.

  14. Exploring the mirror matter interpretation of the DAMA experiment: Has the dark matter problem been solved?

    OpenAIRE

    Foot, R.

    2004-01-01

    The self consistency between the impressive DAMA annual modulation signal and the differential energy spectrum is an important test for dark matter candidates.Mirror matter-type dark matter passes this test while other dark matter candidates, including standard (spin-independent) WIMPs and mini-electric charged particle dark matter, do not do so well.We argue that the unique properties of mirror matter-type dark matter seem to be just those required to fully explain the data, suggesting that ...

  15. 36 CFR 902.51 - Records relating to matters that are required by Executive order to be kept secret.

    Science.gov (United States)

    2010-07-01

    ... that are required by Executive order to be kept secret. 902.51 Section 902.51 Parks, Forests, and... order to be kept secret. Records relating to matters that are specifically authorized under criteria established by an Executive order to be kept secret in the interest of national defense or foreign policy...

  16. Permit.LOA table

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This table includes the effective dates by vessel and permit number for each issued letter of authorization (LOA) by the Permit Office (APSD)

  17. In-stack condensible particulate matter measurement and permitting issues

    International Nuclear Information System (INIS)

    Corio, L.A.; Sherwell, J.

    1997-01-01

    Based on the results of recent epidemiological studies and assessments of the causes of visibility degradation, EPA is proposing to regulate PM2.5 emissions. PM can be classified as either filterable or condensible PM. Condensible PM includes sulfates, such as sulfuric acid. Sulfates typically account for at least half of the total dry fine PM mass in the atmosphere. Power plant SO x -based emissions make a significant contribution to ambient fine PM levels in the eastern US. Although much of this mass is derived from secondary chemical reactions in the atmosphere, a portion of this sulfate is emitted directly from stacks as condensible PM. The potential condensible PM fraction associated with coal-burning boiler emissions is somewhat uncertain. The characterization of PM emissions from these sources has been, until recently, based on in-stack filterable PM measurements only. To determine the relative magnitude of condensible PM emissions and better understand condensible PM measurement issues, a review and analysis of actual EPA Method 202 results and state-developed hybrid condensible PM methods were conducted. A review of available Method 202 results for several coal-burning boilers showed that the condensible PM, on average, comprises 60% of the total PM10. A review of recent results for state-developed measurement methods for condensible PM for numerous coal-burning boilers indicated that condensible PM accounted for, on average, approximately 49% of total PM. Caution should be exercised in the use of these results because of the seemingly unresolved issue of artifact formation, which may bias the Method 202 and state-developed methods results on the high side. Condensible PM10 measurement results and issues, and potential ramifications of including condensible PM10 emissions in the PSD permit review process are discussed. Selected power plants in Maryland are discussed as examples

  18. Asymmetric learning by doing and dynamically efficient policy: implications for domestic and international emissions permit trading of allocating permits usefully

    International Nuclear Information System (INIS)

    Read, Peter

    2000-01-01

    Learning by doing leads to cost reductions as suppliers move down the 'experience curve'. This results in a beneficial supply side inter-temporal externality that, for dynamic efficiency, requires a higher incentive for abatement innovations than the penalty on emissions. This effect can be achieved by a dedicated emissions tax or by a proportionate abatement obligation or by allocating permits usefully. The latter arrangement is compatible with the effective cap on emissions that is secured by an emissions trading scheme. Each of the three possibilities results in a reduced loss of international competitivity in policy-committed regions, in less 'leakage, and in more technology transfer. Implications for trading in emissions permits and in project-related credits are discussed. (Author)

  19. Forest Products Industry Permitting Information

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  20. Environmental permits in Arab Gulf countries - local government perspective

    International Nuclear Information System (INIS)

    Kuczynski, L.

    2002-01-01

    The legacy of past environmentally careless oil and gas exploration practices is becoming more apparent as time goes by and our understanding of causes and results increase. In many petroleum producing countries and in Arab Gulf countries in particular, this understanding has resulted in greater social demand for environmental protection and responsible exploitation of limited resources. In response to this demand, governments of the Gulf Region are paying increasingly more attention to the responsible management of environmental impacts of new developments. As a result, most of them require developers to obtain environmental permits supported by a variety of environmental baseline studies, Environmental Impact Assessments and comprehensive Environmental Management Plans. These local environmental requirements are similar to those in North America and Europe, although there are some important differences on account of local environmental, historical and socioeconomic conditions. Developers, who choose to ignore them, often find their projects caught in a web of unfamiliar environmental regulations or administrative procedures that may cause costly and unnecessary delays. Based on the author's Canadian and Arab Gulf regulatory experience, this paper describes some common causes that may delay obtaining environmental permits or cause cancellation of a project, and provides ideas to assist companies in securing necessary permits and licenses. (author)

  1. Impeded Dark Matter

    Energy Technology Data Exchange (ETDEWEB)

    Kopp, Joachim; Liu, Jia [PRISMA Cluster of Excellence & Mainz Institute for Theoretical Physics,Johannes Gutenberg University,Staudingerweg 7, 55099 Mainz (Germany); Slatyer, Tracy R. [Center for Theoretical Physics, Massachusetts Institute of Technology,Cambridge, MA 02139 (United States); Wang, Xiao-Ping [PRISMA Cluster of Excellence & Mainz Institute for Theoretical Physics,Johannes Gutenberg University,Staudingerweg 7, 55099 Mainz (Germany); Xue, Wei [Center for Theoretical Physics, Massachusetts Institute of Technology,Cambridge, MA 02139 (United States)

    2016-12-12

    We consider dark matter models in which the mass splitting between the dark matter particles and their annihilation products is tiny. Compared to the previously proposed Forbidden Dark Matter scenario, the mass splittings we consider are much smaller, and are allowed to be either positive or negative. To emphasize this modification, we dub our scenario “Impeded Dark Matter”. We demonstrate that Impeded Dark Matter can be easily realized without requiring tuning of model parameters. For negative mass splitting, we demonstrate that the annihilation cross-section for Impeded Dark Matter depends linearly on the dark matter velocity or may even be kinematically forbidden, making this scenario almost insensitive to constraints from the cosmic microwave background and from observations of dwarf galaxies. Accordingly, it may be possible for Impeded Dark Matter to yield observable signals in clusters or the Galactic center, with no corresponding signal in dwarfs. For positive mass splitting, we show that the annihilation cross-section is suppressed by the small mass splitting, which helps light dark matter to survive increasingly stringent constraints from indirect searches. As specific realizations for Impeded Dark Matter, we introduce a model of vector dark matter from a hidden SU(2) sector, and a composite dark matter scenario based on a QCD-like dark sector.

  2. Impeded Dark Matter

    International Nuclear Information System (INIS)

    Kopp, Joachim; Liu, Jia; Slatyer, Tracy R.; Wang, Xiao-Ping; Xue, Wei

    2016-01-01

    We consider dark matter models in which the mass splitting between the dark matter particles and their annihilation products is tiny. Compared to the previously proposed Forbidden Dark Matter scenario, the mass splittings we consider are much smaller, and are allowed to be either positive or negative. To emphasize this modification, we dub our scenario “Impeded Dark Matter”. We demonstrate that Impeded Dark Matter can be easily realized without requiring tuning of model parameters. For negative mass splitting, we demonstrate that the annihilation cross-section for Impeded Dark Matter depends linearly on the dark matter velocity or may even be kinematically forbidden, making this scenario almost insensitive to constraints from the cosmic microwave background and from observations of dwarf galaxies. Accordingly, it may be possible for Impeded Dark Matter to yield observable signals in clusters or the Galactic center, with no corresponding signal in dwarfs. For positive mass splitting, we show that the annihilation cross-section is suppressed by the small mass splitting, which helps light dark matter to survive increasingly stringent constraints from indirect searches. As specific realizations for Impeded Dark Matter, we introduce a model of vector dark matter from a hidden SU(2) sector, and a composite dark matter scenario based on a QCD-like dark sector.

  3. 77 FR 67407 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2012-11-09

    ... designation of certain animals and certain geographic areas a requiring special protection. The regulations establish such a permit system to designate Antarctic Specially Protected Areas. The applications received... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic...

  4. 50 CFR 660.25 - Permits.

    Science.gov (United States)

    2010-10-01

    ... change and the reasons for the request. If the permit requested to be changed to the base permit is..., vessel owner, or permit owner for any reason. The sablefish at-sea processing exemption will expire upon... ownership. (G) For a request to change a permit's ownership that is necessitated by divorce, the individual...

  5. 41 CFR 102-74.500 - Can Federal agencies disapprove permit applications or cancel issued permits?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Can Federal agencies disapprove permit applications or cancel issued permits? 102-74.500 Section 102-74.500 Public Contracts and... cancel issued permits? Yes, Federal agencies may disapprove any permit application or cancel an issued...

  6. 77 FR 67792 - Proposed Information Collection; Comment Request; Northeast Region Permit Family of Forms

    Science.gov (United States)

    2012-11-14

    ... Collection; Comment Request; Northeast Region Permit Family of Forms AGENCY: National Oceanic and Atmospheric... offered in the Northeast region. Exemption programs may allow a vessel to fish in an area that is limited.... Vessels are also required to request gillnet and lobster tags through the Northeast region permit office...

  7. Federal and state permits required to open a new uranium mine with comments on uranium development on Indian reservations

    International Nuclear Information System (INIS)

    Root, T.E.; Whisler, J.S.

    1976-01-01

    Three federally related problems are discussed: the environmental impact statement, water discharge permits, and access. A cookbook approach to the permitting process is given as it exists in Wyoming, Utah, New Mexico, and Arizona. The question of jurisdiction is dealt with by using a case study approach to illustrate how jurisdiction bears on uranium development on Indian reservations

  8. Title V Permitting Statistics Inventory

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Title V Permitting Statistics Inventory contains measured and estimated nationwide statistical data, consisting of counts of permitted sources, types of permits...

  9. Strange matter in compact stars

    Directory of Open Access Journals (Sweden)

    Klähn Thomas

    2018-01-01

    Full Text Available We discuss possible scenarios for the existence of strange matter in compact stars. The appearance of hyperons leads to a hyperon puzzle in ab-initio approaches based on effective baryon-baryon potentials but is not a severe problem in relativistic mean field models. In general, the puzzle can be resolved in a natural way if hadronic matter gets stiffened at supersaturation densities, an effect based on the quark Pauli quenching between hadrons. We explain the conflict between the necessity to implement dynamical chiral symmetry breaking into a model description and the conditions for the appearance of absolutely stable strange quark matter that require both, approximately masslessness of quarks and a mechanism of confinement. The role of strangeness in compact stars (hadronic or quark matter realizations remains unsettled. It is not excluded that strangeness plays no role in compact stars at all. To answer the question whether the case of absolutely stable strange quark matter can be excluded on theoretical grounds requires an understanding of dense matter that we have not yet reached.

  10. Strange matter in compact stars

    Science.gov (United States)

    Klähn, Thomas; Blaschke, David B.

    2018-02-01

    We discuss possible scenarios for the existence of strange matter in compact stars. The appearance of hyperons leads to a hyperon puzzle in ab-initio approaches based on effective baryon-baryon potentials but is not a severe problem in relativistic mean field models. In general, the puzzle can be resolved in a natural way if hadronic matter gets stiffened at supersaturation densities, an effect based on the quark Pauli quenching between hadrons. We explain the conflict between the necessity to implement dynamical chiral symmetry breaking into a model description and the conditions for the appearance of absolutely stable strange quark matter that require both, approximately masslessness of quarks and a mechanism of confinement. The role of strangeness in compact stars (hadronic or quark matter realizations) remains unsettled. It is not excluded that strangeness plays no role in compact stars at all. To answer the question whether the case of absolutely stable strange quark matter can be excluded on theoretical grounds requires an understanding of dense matter that we have not yet reached.

  11. ENVIRONMENTAL SPECIFICATION REQUIREMENTS

    International Nuclear Information System (INIS)

    TIFFT, S.R.

    2003-01-01

    Through regulations, permitting or binding negotiations, Regulators establish requirements, limits, permit conditions and Notice of Construction (NOC) conditions with which the Office of River Protection (ORP) and the Tank Farm Contractor (TFC) must comply. Operating Specifications are technical limits which are set on a process to prevent injury to personnel, or damage to the facility or environment. The main purpose of this document is to provide specification limits and recovery actions for the TFC Environmental Surveillance Program at the Hanford Site. Specification limits are given for monitoring frequencies and permissible variation of readings from an established baseline or previous reading. The requirements in this document are driven by environmental considerations and data analysis issues, rather than facility design or personnel safety issues. This document is applicable to all SST and DST waste tanks, and the associated catch tanks and receiver tanks, and transfer systems. This Tank Farm ESD implements environmental-regulatory limits on the configuration and operation of the Hanford Tank Farms facility that have been established by Regulators. This ESD contains specific field operational limits and recovery actions for compliance with airborne effluent regulations and agreements, liquid effluents regulations and agreements, and environmental tank system requirements. The scope of this ESD is limited to conditions that have direct impact on Operations/Projects or that Operations/Projects have direct impact upon. This document does not supercede or replace any DOE Orders, regulatory permits, notices of construction, or Regulatory agency agreements binding on the ORP or the TFC. Refer to the appropriate regulation, permit, or NOC for an inclusive listing of requirements

  12. 50 CFR 22.25 - What are the requirements concerning permits to take golden eagle nests?

    Science.gov (United States)

    2010-10-01

    ... nests are inactive, if the taking is compatible with the preservation of the area nesting population of... Director—Attention: Migratory Bird Permit Office. You can find addresses for the appropriate Regional... applicant must calculate the area nesting population of golden eagles and identify on an appropriately...

  13. 50 CFR 18.31 - Scientific research permits and public display permits.

    Science.gov (United States)

    2010-10-01

    ... the population stock and the marine ecosystem. In determining whether to issue a public display permit... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Scientific research permits and public..., DEPARTMENT OF THE INTERIOR (CONTINUED) TAKING, POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER...

  14. Hanford Facility RCRA permit handbook

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Purpose of this Hanford Facility (HF) RCRA Permit Handbook is to provide, in one document, information to be used for clarification of permit conditions and guidance for implementing the HF RCRA Permit.

  15. Globular cluster neutron stars and the determination of the dense matter equation of state

    Science.gov (United States)

    Guillot, Sebastien

    2016-09-01

    Combining measurements of the mass and radius of multiple neutron stars (NSs) represents the most promising way to determine the equation of state of dense NS matter. NSs in quiescent low-mass x-ray binaries (qLMXB) located in globular clusters have placed useful constraints on the equation of state. The statistical approaches combining measurements from multiple NSs can be further improved by the addition of more NS observations. We propose here to obtain a high signal to noise spectrum of the qLMXB in M30, the only low-absorption globular cluster qLMXBs that does not have deep X-ray observations, and which requires Chandra unmatched angular resolution. The 300 ks proposed observation will permit measurement of the NS radius with 12-15% uncertainties.

  16. Kaons in nuclear matter

    International Nuclear Information System (INIS)

    Kolomeitsev, E.E.

    1997-02-01

    The subject of the doctoral thesis is examination of the properties of kaons in nuclear matter. A specific method is explained that has been developed for the scientific objectives of the thesis and permits description of the kaon-nucleon interactions and kaon-nucleon scattering in a vacuum. The main challenge involved was to find approaches that would enable application of the derived relations out of the kaon mass shell, connected with the second objective, namely to possibly find methods which are independent of models. The way chosen to achieve this goal relied on application of reduction formulas as well as current algebra relations and the PCAC hypothesis. (orig./CB) [de

  17. Dynamical matter-parity breaking and gravitino dark matter

    International Nuclear Information System (INIS)

    Schmidt, Jonas; Weniger, Christoph; Yanagida, Tsutomu T.; Tokyo Univ.

    2010-10-01

    Scenarios where gravitinos with GeV masses make up dark matter are known to be in tension with high reheating temperatures, as required by e.g. thermal leptogenesis. This tension comes from the longevity of the NLSPs, which can destroy the successful predictions of the standard primordial nucleosynthesis. However, a small violation of matter parity can open new decay channels for the NLSP, avoiding the BBN problems, while being compatible with experimental cosmic-ray constraints. In this paper, we propose a model where matter parity, which we assume to be embedded in the U(1) B-L gauge symmetry, is broken dynamically in a hidden sector at low scales. This can naturally explain the smallness of the matter parity breaking in the visible sector. We discuss the dynamics of the corresponding pseudo Nambu-Goldstone modes of B-L breaking in the hidden sector, and we comment on typical cosmic-ray and collider signatures in our model. (orig.)

  18. Dynamical matter-parity breaking and gravitino dark matter

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, Jonas; Weniger, Christoph [Deutsches Elektronen-Synchrotron (DESY), Hamburg (Germany); Tokyo Univ. (JP). Inst. for the Physics and Mathematics of the Universe (IPMU); Yanagida, Tsutomu T. [Tokyo Univ. (JP). Inst. for the Physics and Mathematics of the Universe (IPMU); Tokyo Univ. (Japan). Dept. of Physics

    2010-10-15

    Scenarios where gravitinos with GeV masses make up dark matter are known to be in tension with high reheating temperatures, as required by e.g. thermal leptogenesis. This tension comes from the longevity of the NLSPs, which can destroy the successful predictions of the standard primordial nucleosynthesis. However, a small violation of matter parity can open new decay channels for the NLSP, avoiding the BBN problems, while being compatible with experimental cosmic-ray constraints. In this paper, we propose a model where matter parity, which we assume to be embedded in the U(1){sub B-L} gauge symmetry, is broken dynamically in a hidden sector at low scales. This can naturally explain the smallness of the matter parity breaking in the visible sector. We discuss the dynamics of the corresponding pseudo Nambu-Goldstone modes of B-L breaking in the hidden sector, and we comment on typical cosmic-ray and collider signatures in our model. (orig.)

  19. 22 CFR 161.10 - Non-Federal applicants for permits.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Non-Federal applicants for permits. 161.10 Section 161.10 Foreign Relations DEPARTMENT OF STATE ENVIRONMENTAL PROTECTION REGULATIONS FOR IMPLEMENTATION OF THE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) Coordination of Other Requirements of NEPA § 161...

  20. Waste-to-energy permitting sourcebook

    International Nuclear Information System (INIS)

    Longwell, D.; Wegrecki, A.; Williams, D.

    1992-10-01

    Environmental issues, regulatory processes and approvals important in obtaining a permit to construct and/or operate a waste-to-energy (WTE) facility are identified and discussed. Environmental issues include: (1) air emission levels, their control and potential impacts, (2) ash leachability, treatment, and disposal, (3) potential health risks from emissions, and (4) other issues such as need/benefit and public perception of WTE. Laws, regulations and approvals that can affect project development are identified and listed, and potential regulatory trends are discussed. A general permit acquisition plan is also presented. An analysis of environmental and regulatory data obtained from the literature, regulatory agencies, and specific projects is presented. California and Massachusetts, both with regulations generally more stringent than federal regulations and considered environmentally conservative, were selected for detailed state regulatory review. Two project case histories (Commerce Refuse-to-Energy (RTE) Project in California and SEMASS WTE Project in Massachusetts) were selected to illustrate: (1) how regulations are actually applied to a project, (2) project-specific permit and operating conditions, and (3) project-specific environmental issues. Modern WTE plots employ state-of-the-art air emission control technologies and strategies to reduce air emission is to levels below regulatory requirements and to reduce estimated health risks to within EPA's acceptable risk range. WTE ash leachate can exhibit hazardous waste characteristics, primarily lead and cadmium. However, modern landfills utilize liners and leachate collection systems to prevent infiltration of leachate into the groundwater supply. Modern WTE plants employ dry systems and have zero process wastewater discharge

  1. Searching for dark matter

    Science.gov (United States)

    Mateo, Mario

    1994-01-01

    Three teams of astronomers believe they have independently found evidence for dark matter in our galaxy. A brief history of the search for dark matter is presented. The use of microlensing-event observation for spotting dark matter is described. The equipment required to observe microlensing events and three groups working on dark matter detection are discussed. The three groups are the Massive Compact Halo Objects (MACHO) Project team, the Experience de Recherche d'Objets Sombres (EROS) team, and the Optical Gravitational Lensing Experiment (OGLE) team. The first apparent detections of microlensing events by the three teams are briefly reported.

  2. Nuclear installations operated without the required permits: the policy pursued in the Netherlands

    International Nuclear Information System (INIS)

    Huygen, A.

    1994-01-01

    The authoress presents two topical cases from the Netherlands where two nuclear installations are allowed to continue operation by a joint decision of the government and the courts, although the legal operating permits have been declared void by a government senate. The legal basis constructed for this approach allowing plant operation to continue for a limited number of years is an explicit statement by the government to tolerate such procedure. The installations are the Bodeward nuclear power station with a BWR and the Almelo URENCO uranium enrichment facility. (orig./HSCH) [de

  3. Recycled Water Reuse Permit Renewal Application for the Central Facilities Area Sewage Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, Mike [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    This renewal application for a Recycled Water Reuse Permit is being submitted in accordance with the Idaho Administrative Procedures Act 58.01.17 “Recycled Water Rules” and the Municipal Wastewater Reuse Permit LA-000141-03 for continuing the operation of the Central Facilities Area Sewage Treatment Plant located at the Idaho National Laboratory. The permit expires March 16, 2015. The permit requires a renewal application to be submitted six months prior to the expiration date of the existing permit. For the Central Facilities Area Sewage Treatment Plant, the renewal application must be submitted by September 16, 2014. The information in this application is consistent with the Idaho Department of Environmental Quality’s Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater and discussions with Idaho Department of Environmental Quality personnel.

  4. Interactive Data Framework and User Interface for Wisconsin’s Oversize-Overweight Vehicle Permits

    Directory of Open Access Journals (Sweden)

    Ahmed S. Shatnawi

    2018-06-01

    Full Text Available With continuing increases in the number of Oversize-Overweight (OSOW vehicle permits issued in recent years, the management and analysis of OSOW permit data is becoming more inefficient and time-consuming. Large quantities of archived OSOW permit data are held by Departments of Transportation (DOTs across the United States, and manual extraction and analysis of this data requires significant effort. In this paper, the authors present a new framework for analyzing Wisconsin’s historic OSOW permit program data. This framework provides an interactive, web-based interface to query the OSOW permit data, link OSOW records to geospatial data features, and dynamically visualize query results. The web-based interface offers scalability and broad accessibility to the data across different DOT divisions, and use cases. Furthermore, a user survey and heuristic evaluation of the interface demonstrate the project’s utility, and identify goals for future system development.

  5. ENVIRONMENTAL SPECIFICATION REQUIREMENTS

    International Nuclear Information System (INIS)

    TIFFT, S.R.

    2003-01-01

    Through regulations, permitting or binding negotiations, Regulators establish requirements, limits, permit conditions and Notice of Construction (NOC) conditions with which the Office of River Protection (ORP) and the Tank Farm Contractor (TFC) must comply. Operating Specifications are technical limits which are set on a process to prevent injury to personnel, or damage to the facility or environment. The main purpose of this document is to provide specification limits and recovery actions for the TFC Environmental Surveillance Program at the Hanford Site. Specification limits are given for monitoring frequencies and permissible variation of readings from an established baseline or previous reading. The requirements in this document are driven by environmental considerations and data analysis issues, rather than facility design or personnel safety issues. This document is applicable to all single-shell tank (SST) and double-shell tank (DST) waste tanks, and the associated catch tanks and receiver tanks, and transfer systems. This Tank Farm Environmental Specifications Document (ESD) implements environmental-regulatory limits on the configuration and operation of the Hanford Tank Farms facility that have been established by Regulators. This ESD contains specific field operational limits and recovery actions for compliance with airborne effluent regulations and agreements, liquid effluents regulations and agreements, and environmental tank system requirements. The scope of this ESD is limited to conditions that have direct impact on Operations Projects or that Operations/Projects have direct impact upon. This document does not supercede or replace any DOE Orders, regulatory permits, notices of construction, or Regulatory agency agreements binding on the ORP or the TFC. Refer to the appropriate regulation, permit, or NOC for an inclusive listing of requirements

  6. Identification of permit and waste acceptance criteria provisions requiring modification for acceptance of commercial mixed waste

    International Nuclear Information System (INIS)

    1994-03-01

    In October 1990, representatives of States and compact regions requested that the US Department of Energy (DOE) explore an agreement with host States and compact regions under which DOE would accept commercial mixed low-level radioactive waste (LLW) at DOE's own treatment and disposal facilities. A program for DOE management of commercial mixed waste is made potentially more attractive in light of the low commercial mixed waste volumes, high regulatory burdens, public opposition to new disposal sites, and relatively high cost of constructing commercial disposal facilities. Several studies were identified as essential in determining the feasibility of DOE accepting commercial mixed waste for disposal. The purpose of this report is to identify any current or proposed waste acceptance criteria (WAC) or Resource Conservation and Recovery Act (RCRA) provisions that would have to be modified for commercial mixed waste acceptance at specified DOE facilities. Following the introduction, Section 2 of this report (a) provides a background summary of existing and proposed mixed waste disposal facilities at each DOE site, and (b) summarizes the status of any RCRA Part B permit and WAC provisions relating to the disposal of mixed waste, including provisions relating to acceptance of offsite waste. Section 3 provides overall conclusions regarding the current status and permit modifications that must be implemented in order to grant DOE sites authority under their permits to accept commercial mixed waste for disposal. Section 4 contains a list of references

  7. 7 CFR 1724.52 - Permitted deviations from RUS construction standards.

    Science.gov (United States)

    2010-01-01

    ... neutrals to provide the required electric service to a consumer, the RUS standard transformer secondary... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Electric System Design § 1724.52 Permitted deviations from RUS construction...

  8. Analysis of radioactive-matter interaction near thermodynamical equilibrium states

    International Nuclear Information System (INIS)

    Damamme, G.

    1993-01-01

    We study the absorption/emission process of photon by matter in the framework of a radiativo-collisionnal model of atom, a thermodynamical approach being used. The considered matter description is the atomic sphere one. First we give the expression of the balance equation around an equilibrium state. Then we express the atomic populations in function of the characteristics of the radiation and of the free electrons and of their time history. This permit us to interpret the photon balance as being due to true emission/absorption process of photons as well as fluorescence terms, all these processes being affected by relaxation effects. The total energy balance between matter and radiation can also be analyzed in the same way and conduct to introduce one photon effective interactions terms for each radiative proper mode, terms also affected by retardation effects. Such a taking into account of atom populations has no consequence on the radiative flux equation (i.e. the transfer opacity) but can considerably modify the energy balance between matter and radiation. (author). 11 refs., 3 figs

  9. Hanford Facility resource conservation and recovery act permit general inspection plan

    International Nuclear Information System (INIS)

    Beagles, D.B.

    1995-12-01

    The Hanford Facility Resource Conservation and Recovery Act Permit, General Inspection Requirements, includes a requirement that general facility inspections be conducted of the 100, 200 East, 200 West, 300, 400, and 1100 Areas and the banks of the Columbia River. This inspection plan describes the activities that shall be conducted for a general inspection of the Hanford Facility

  10. Tradeable CO{sub 2} emission permits: initial distribution as a justice problem

    Energy Technology Data Exchange (ETDEWEB)

    Kverndokk, S. [Stiftelsen for Samfunns- og Naeringslivsforskning, Oslo (Norway)

    1992-11-01

    Tradeable emission permits are one of the most discussed policy instruments to implement international agreements on CO{sub 2} emission reductions. One characteristic of this instrument is that it separates the questions of efficiency and justice; in an idealised world, efficiency is achieved no matter how the permits are distributed. By assuming separability of inter- and intragenerational justice, the author can discuss the initial distribution of permits as an intragenerational distributive justice problem. In contrast to efficiency, where Pareto Optimality is an overall accepted principle, there is no consensus on a ``best`` equity principle. Different principles lead to different rules for distribution. The framework is to consider what the author believe to be metaprinciples of theories of justice; ethical individualism and presentism, as well as a generally accepted principle of avoiding morally arbitrary components as standards for distribution. Using these principles in an exclusionary way, working with a list of alternative allocation rules, a distribution proportional to population is recommended. Arguments against this rule are discussed, and special attention is paid to political feasibility. Justice and political feasibility may contrast, so also in this case. Even if a distribution based only on population may be politically unacceptable, there may be prospects to use this criterion in combination with other rules, as well as to put more weight on it in the future. 26 refs.

  11. Tradeable CO[sub 2] emission permits: initial distribution as a justice problem

    Energy Technology Data Exchange (ETDEWEB)

    Kverndokk, S. (Stiftelsen for Samfunns- og Naeringslivsforskning, Oslo (Norway))

    1992-11-01

    Tradeable emission permits are one of the most discussed policy instruments to implement international agreements on CO[sub 2] emission reductions. One characteristic of this instrument is that it separates the questions of efficiency and justice; in an idealised world, efficiency is achieved no matter how the permits are distributed. By assuming separability of inter- and intragenerational justice, the author can discuss the initial distribution of permits as an intragenerational distributive justice problem. In contrast to efficiency, where Pareto Optimality is an overall accepted principle, there is no consensus on a ''best'' equity principle. Different principles lead to different rules for distribution. The framework is to consider what the author believe to be metaprinciples of theories of justice; ethical individualism and presentism, as well as a generally accepted principle of avoiding morally arbitrary components as standards for distribution. Using these principles in an exclusionary way, working with a list of alternative allocation rules, a distribution proportional to population is recommended. Arguments against this rule are discussed, and special attention is paid to political feasibility. Justice and political feasibility may contrast, so also in this case. Even if a distribution based only on population may be politically unacceptable, there may be prospects to use this criterion in combination with other rules, as well as to put more weight on it in the future. 26 refs.

  12. 78 FR 3966 - Notice of Applications for Modification of Special Permit

    Science.gov (United States)

    2013-01-17

    ... hazardous materials, packaging design changes, additional mode of transportation, etc.) are described in...), permit to authorize new 173.13(c)(1)(ii), packaging requirements 173.13(c)(1)(iv), for Division 6.1 PG II...

  13. Determination of combustible volatile matter in coal mine roadway dusts by backscatter of x-rays from a radioisotope source

    International Nuclear Information System (INIS)

    Ailwood, C.R.; Bunch, K.; Fookes, R.A.; Gravitis, V.L.; Watt, J.S.

    1977-01-01

    The combustible volatile matter in coal mine roadway dusts (CVM) has been determined using x-ray backscatter techniques. The correlation between x-ray and chemical techniques is reasonably good for the 92 samples from collieries on the Bulli seam, and the maximum error expected at the maximum level of 11.5 weight per cent CVM permitted in the N.S.W. Coal Mines Regulation Act, 1912, as amended, is about +- 2.5 weight per cent. This x-ray technique can be used only when the combustible volatile content of the coal matter (CVM) varies within a limited range, and a separate calibration is required for each coal seam. Portable equipment based on a radioisotope x-ray source and digital ratemeter makes possible simple and rapid analysis, and with adaptation to use in coal mines should lead to much more comprehensive testing of roadways and hence improved overall prevention of coal dust explosions. (author)

  14. Feed tank transfer requirements

    International Nuclear Information System (INIS)

    Freeman-Pollard, J.R.

    1998-01-01

    This document presents a definition of tank turnover; DOE responsibilities; TWRS DST permitting requirements; TWRS Authorization Basis (AB) requirements; TWRS AP Tank Farm operational requirements; unreviewed safety question (USQ) requirements; records and reporting requirements, and documentation which will require revision in support of transferring a DST in AP Tank Farm to a privatization contractor for use during Phase 1B

  15. The Search for Primordial Molecular Cloud Matter

    DEFF Research Database (Denmark)

    van Kooten, Elishevah M M E

    evolution. Some of the least altered, most primitive meteorites can give us clues to the original make-up of the interstellar molecular cloud from which the Sun and its surrounding planets formed, thus, permitting us to trace Solar System formation from its most early conditions. Using state......Our Solar System today presents a somewhat static picture compared to the turbulent start of its existence. Meteorites are the left-over building blocks of planet formation and allow us to probe the chemical and physical processes that occurred during the first few million years of Solar System...... prebiotic species such as amino acids, determining the formation pathways of this organic matter is of utmost importance to understanding the habitability of Earth as well as exoplanetary systems. Hence, further detailed analyses of organic matter in some of the meteorites with primordial signatures have...

  16. Hydropower : A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    Energy Technology Data Exchange (ETDEWEB)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  17. Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    Energy Technology Data Exchange (ETDEWEB)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  18. 10 CFR 50.23 - Construction permits.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  19. Anisotropy of dark matter velocity distribution

    OpenAIRE

    Nagao, Keiko I.

    2018-01-01

    Direct detection of dark matter with directional sensitivity has the potential to discriminate the dark matter velocity distribution. Especially, it will be suitable to discriminate isotropic distribution from anisotropic one. Analyzing data produced with Monte-Carlo simulation, required conditions for the discrimination is estimated. If energy threshold of detector is optimized, $O(10^3-10^4)$ event number is required to discriminate the anisotropy.

  20. The particulate matter dispersion studies from a local palm oil mill

    International Nuclear Information System (INIS)

    Abdullah, L.C.; Wong, L. L.; Amnorzahira, A.; Sa'ari, M.; Abdul Rashid, M. S.; Salmiaton Ali

    2006-01-01

    The appearance of industrial emissions and the degradation of scenic vistas are two characteristics of air pollution that humans object. Reduction in visibility suggests worsening pollution levels. The emissions from mobile source and stationary source are the major source of air pollutions contribution in Malaysia. Suspended particulate matter (SPM). The consequence of increasing the particulate concentrations, the particulate matter dissolves with vapour and grows into droplets when the humidity exceeds approximately 70% and causing opaque situation know as haze. This work focuses on the dispersion particulate matter from palm oil mill. The data obtained serves the purpose of modeling the transport of particulate matter for obtaining permits and prevention of significant deterioration (PSD) to the environment. Gaussian Plume Model from a point source, subject to various atmospheric conditions is used to calculate particulate matter concentration then display the distribution of plume dispersion using geographic information system (GIS). The calculated particulate matter concentration is evaluated using Transilient Matrice function. Atmospheric Stability, mixing height, wind direction, wind speed, natural and artificial features play an important role in dispersion process. High concentration area exhibits immediately under prevailing wind direction. (Author)

  1. A conceptual analysis of the application of tradable permits to biodiversity conservation.

    Science.gov (United States)

    Wissel, Silvia; Wätzold, Frank

    2010-04-01

    Tradable permits have been applied in many areas of environmental policy and may be a response to increasing calls for flexible conservation instruments that successfully conserve biodiversity while allowing for economic development. The idea behind applying tradable permits to conservation is that developers wishing to turn land to economic purposes, thereby destroying valuable habitat, may only do so if they submit a permit to the conservation agency showing that habitat of at least the equivalent ecological value is restored elsewhere. The developer himself does not need to carry out the restoration, but may buy a permit from a third party, thus allowing a market to emerge. Nevertheless, the application of tradable permits to biodiversity conservation is a complex issue because destroyed and restored habitats are likely to differ. There may be various trade-offs between the ecological requirements that destroyed and restored habitats be as similar as possible, and the need for a certain level of market activity to have a functioning trading system. The success of tradable permits as an instrument for reconciling the conflicts between economic development and conservation depends on the existence of certain economic, institutional, and ecological preconditions, for example, a functioning institutional framework, sufficient expert knowledge, and adequate monitoring and enforcement mechanisms.

  2. 2008 Contruction General Permits & Multi-Sector General Permits

    Data.gov (United States)

    U.S. Environmental Protection Agency — View stormwater notices of intent (NOIs) for construction projects under EPA's 2008 Construction General Permit (CGP), for Low Erosivity Waivers (LEWs) submitted...

  3. Guidance for writing permits for the use or disposal of sewage sludge. Draft report

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    Section 405(d) of the Clean Water Act (CWA) directs the U.S. Environmental Protection Agency (EPA) to develop regulations containing guidelines for the use and disposal of sewage sludge. On February 19th, 1993, EPA published final regulations at 40 Code of Federal Regulations (CFR) Part 503 as the culmination of a major effort to develop technical standards in response to Section 405(d). These regulations govern three sewage sludge use and disposal practices: land application, surface disposal, and incineration. A key element in EPA's implementation of the Part 503 regulations is educating Agency and State personnel about these new requirements. Although the regulations are generally directly enforceable against all persons involved in the use and disposal of sewage sludge, they will also be implemented through permits issued to treatment works treating domestic sewage as defined in 40 CFR 122.22. Thus, the primary focus of the manual is to assist permit writers in incorporating the Part 503 requirements into permits; it serves as an update to the Guidance for Writing Case-by-Case Permit Conditions for Municipal Sewage Sludge (PB91-145508/HDM).

  4. 78 FR 2957 - Notice of Applicability of Special Use Permit Requirements to Certain Categories of Activities...

    Science.gov (United States)

    2013-01-15

    ... MONITOR, NOAA has determined that enhancing recreational diving access to the wreck is a priority. NOAA... diving near the USS MONITOR; and (2) fireworks displays. The remaining two special use permit categories..., etc. Specific examples of such events involve the promotion of SCUBA diving; an annual underwater...

  5. State Waste Discharge Permit Application: Electric resistance tomography testing

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    This permit application documentation is for a State Waste Discharge Permit issued in accordance with requirements of Washington Administrative Code 173-216. The activity being permitted is a technology test using electrical resistance tomography. The electrical resistance tomography technology was developed at Lawrence Livermore National Laboratory and has been used at other waste sites to track underground contamination plumes. The electrical resistance tomography technology measures soil electrical resistance between two electrodes. If a fluid contaminated with electrolytes is introduced into the soil, the soil resistance is expected to drop. By using an array of measurement electrodes in several boreholes, the areal extent of contamination can be estimated. At the Hanford Site, the purpose of the testing is to determine if the electrical resistance tomography technology can be used in the vicinity of large underground metal tanks without the metal tank interfering with the test. It is anticipated that the electrical resistance tomography technology will provide a method for accurately detecting leaks from the bottom of underground tanks, such as the Hanford Site single-shell tanks.

  6. State Waste Discharge Permit Application: Electric resistance tomography testing

    International Nuclear Information System (INIS)

    1994-04-01

    This permit application documentation is for a State Waste Discharge Permit issued in accordance with requirements of Washington Administrative Code 173-216. The activity being permitted is a technology test using electrical resistance tomography. The electrical resistance tomography technology was developed at Lawrence Livermore National Laboratory and has been used at other waste sites to track underground contamination plumes. The electrical resistance tomography technology measures soil electrical resistance between two electrodes. If a fluid contaminated with electrolytes is introduced into the soil, the soil resistance is expected to drop. By using an array of measurement electrodes in several boreholes, the areal extent of contamination can be estimated. At the Hanford Site, the purpose of the testing is to determine if the electrical resistance tomography technology can be used in the vicinity of large underground metal tanks without the metal tank interfering with the test. It is anticipated that the electrical resistance tomography technology will provide a method for accurately detecting leaks from the bottom of underground tanks, such as the Hanford Site single-shell tanks

  7. QCD Axion Dark Matter with a Small Decay Constant

    Science.gov (United States)

    Co, Raymond T.; Hall, Lawrence J.; Harigaya, Keisuke

    2018-05-01

    The QCD axion is a good dark matter candidate. The observed dark matter abundance can arise from misalignment or defect mechanisms, which generically require an axion decay constant fa˜O (1011) GeV (or higher). We introduce a new cosmological origin for axion dark matter, parametric resonance from oscillations of the Peccei-Quinn symmetry breaking field, that requires fa˜(108- 1011) GeV . The axions may be warm enough to give deviations from cold dark matter in large scale structure.

  8. 30 CFR 843.13 - Suspension or revocation of permits: Pattern of violations.

    Science.gov (United States)

    2010-07-01

    ... order to a permittee requiring him or her to show cause why his or her permit and right to mine under... the circumstances, including: (i) The number of violations, cited on more than one occasion, of the... number of violations, cited on more than one occasion, of different requirements of the Act, this chapter...

  9. Working while incapable to work? Changing concepts of permitted work in the UK disability benefit system

    Directory of Open Access Journals (Sweden)

    Jackie Gulland

    2017-11-01

    Full Text Available This article focusses on the borderland between "work" and "not work" in UK disability benefit systems. People who claim disability benefits often have to prove that they are "incapable of work" in order to qualify. The idea of incapacity for work requires an understanding of the meaning of the term "work," a concept which has a common sense simplicity but which is much more difficult to define in practice. UK disability benefit systems have developed the notion of "permitted work" to allow people to do small amounts of paid work while retaining entitlement to benefit. This concept of "permitted work" has its roots in the early twentieth century when claimants were sometimes entitled to disability benefits if any work that they did was considered to be sufficiently trivial to not count as "work." Policy on this changed over time, with particular developments after the Second World War, as rehabilitation and therapy became the key focus of permitted work rules. Current developments in UK social security policy treat almost everyone as a potential worker, changing the way in which permitted work operates. This article uses archive material on appeals against refusals of benefit, policy documents and case law to consider the social meanings of these moving boundaries of permitted work. Disability benefits are not value neutral: they are measures of social control which divide benefit claimants into those who are required to participate in the labour market and those who are exempted from this requirement.

  10. Automatic Commercial Permit Sets

    Energy Technology Data Exchange (ETDEWEB)

    Grana, Paul [Folsom Labs, Inc., San Francisco, CA (United States)

    2017-12-21

    Final report for Folsom Labs’ Solar Permit Generator project, which has successfully completed, resulting in the development and commercialization of a software toolkit within the cloud-based HelioScope software environment that enables solar engineers to automatically generate and manage draft documents for permit submission.

  11. Asymmetric Higgsino dark matter.

    Science.gov (United States)

    Blum, Kfir; Efrati, Aielet; Grossman, Yuval; Nir, Yosef; Riotto, Antonio

    2012-08-03

    In the supersymmetric framework, prior to the electroweak phase transition, the existence of a baryon asymmetry implies the existence of a Higgsino asymmetry. We investigate whether the Higgsino could be a viable asymmetric dark matter candidate. We find that this is indeed possible. Thus, supersymmetry can provide the observed dark matter abundance and, furthermore, relate it with the baryon asymmetry, in which case the puzzle of why the baryonic and dark matter mass densities are similar would be explained. To accomplish this task, two conditions are required. First, the gauginos, squarks, and sleptons must all be very heavy, such that the only electroweak-scale superpartners are the Higgsinos. With this spectrum, supersymmetry does not solve the fine-tuning problem. Second, the temperature of the electroweak phase transition must be low, in the (1-10) GeV range. This condition requires an extension of the minimal supersymmetric standard model.

  12. Mesoscopic modelling and simulation of soft matter.

    Science.gov (United States)

    Schiller, Ulf D; Krüger, Timm; Henrich, Oliver

    2017-12-20

    The deformability of soft condensed matter often requires modelling of hydrodynamical aspects to gain quantitative understanding. This, however, requires specialised methods that can resolve the multiscale nature of soft matter systems. We review a number of the most popular simulation methods that have emerged, such as Langevin dynamics, dissipative particle dynamics, multi-particle collision dynamics, sometimes also referred to as stochastic rotation dynamics, and the lattice-Boltzmann method. We conclude this review with a short glance at current compute architectures for high-performance computing and community codes for soft matter simulation.

  13. AQUIS: A PC-based air quality and permit information system

    International Nuclear Information System (INIS)

    Smith, A.E.; Huber, C.C.; Tschanz, J.; Ryckman, J.S. Jr.

    1992-01-01

    The Air Quality Utility Information System (AQUIS) was developed to calculate and track emissions, permits, and related information. The system runs on IBM-compatible personal computers using dBASE IV. AQUIS tracks more than 900 data items distributed among various source categories and allows the user to enter specific information on permit control devices, stacks, and related regulatory requirements. The system is currently operating at seven US Air Force Materiel Command facilities, large industrial operations involved in the repair and maintenance of aircraft. Environmental management personnel are responsible for the compliance status of as many as l,000 sources at each facility. The usefulness of the system has been enhanced by providing a flexible reporting capability that permits users who are unfamiliar with database structure to design and prepare reports containing specified information. In addition to the standard six pollutants, AQUIS calculates compound-specific emissions and allows users to enter their own emission estimates. This capability will be useful in developing air toxics inventories and control plans

  14. Z2 SIMP dark matter

    International Nuclear Information System (INIS)

    Bernal, Nicolás; Chu, Xiaoyong

    2016-01-01

    Dark matter with strong self-interactions provides a compelling solution to several small-scale structure puzzles. Under the assumption that the coupling between dark matter and the Standard Model particles is suppressed, such strongly interacting massive particles (SIMPs) allow for a successful thermal freeze-out through N-to-N' processes, where N dark matter particles annihilate to N' of them. In the most common scenarios, where dark matter stability is guaranteed by a Z 2 symmetry, the seemingly leading annihilating channel, i.e. 3-to-2 process, is forbidden, so the 4-to-2 one dominate the production of the dark matter relic density. Moreover, cosmological observations require that the dark matter sector is colder than the thermal bath of Standard Model particles, a condition that can be dynamically generated via a small portal between dark matter and Standard Model particles, à la freeze-in. This scenario is exemplified in the context of the Singlet Scalar dark matter model

  15. Run permit software for the proton storage ring

    International Nuclear Information System (INIS)

    Bair, S.S.

    1985-01-01

    The Run Permit system is intended to protect equipment from radiation effects caused by having beam enabled when required equipment is not operational. This system will not allow beam unless certain devices are ready and will drop beam if any of these devices become inoperative. A system to provide such protection might be implemented in hardware. However, because the several operating modes of the Proton Storage Ring/Weapons Neutron Research facility require certain devices to be in different states (depending on mode), a dynamic configuration capability is needed, that is, a software solution is more feasible

  16. Working Group Report: Dark Matter Complementarity (Dark Matter in the Coming Decade: Complementary Paths to Discovery and Beyond)

    Energy Technology Data Exchange (ETDEWEB)

    Arrenberg, Sebastian; et al.,

    2013-10-31

    In this Report we discuss the four complementary searches for the identity of dark matter: direct detection experiments that look for dark matter interacting in the lab, indirect detection experiments that connect lab signals to dark matter in our own and other galaxies, collider experiments that elucidate the particle properties of dark matter, and astrophysical probes sensitive to non-gravitational interactions of dark matter. The complementarity among the different dark matter searches is discussed qualitatively and illustrated quantitatively in several theoretical scenarios. Our primary conclusion is that the diversity of possible dark matter candidates requires a balanced program based on all four of those approaches.

  17. Dark matter and cosmology

    Energy Technology Data Exchange (ETDEWEB)

    Schramm, D.N.

    1992-03-01

    The cosmological dark matter problem is reviewed. The Big Bang Nucleosynthesis constraints on the baryon density are compared with the densities implied by visible matter, dark halos, dynamics of clusters, gravitational lenses, large-scale velocity flows, and the {Omega} = 1 flatness/inflation argument. It is shown that (1) the majority of baryons are dark; and (2) non-baryonic dark matter is probably required on large scales. It is also noted that halo dark matter could be either baryonic or non-baryonic. Descrimination between ``cold`` and ``hot`` non-baryonic candidates is shown to depend on the assumed ``seeds`` that stimulate structure formation. Gaussian density fluctuations, such as those induced by quantum fluctuations, favor cold dark matter, whereas topological defects such as strings, textures or domain walls may work equally or better with hot dark matter. A possible connection between cold dark matter, globular cluster ages and the Hubble constant is mentioned. Recent large-scale structure measurements, coupled with microwave anisotropy limits, are shown to raise some questions for the previously favored density fluctuation picture. Accelerator and underground limits on dark matter candidates are also reviewed.

  18. Dark matter and cosmology

    Energy Technology Data Exchange (ETDEWEB)

    Schramm, D.N.

    1992-03-01

    The cosmological dark matter problem is reviewed. The Big Bang Nucleosynthesis constraints on the baryon density are compared with the densities implied by visible matter, dark halos, dynamics of clusters, gravitational lenses, large-scale velocity flows, and the {Omega} = 1 flatness/inflation argument. It is shown that (1) the majority of baryons are dark; and (2) non-baryonic dark matter is probably required on large scales. It is also noted that halo dark matter could be either baryonic or non-baryonic. Descrimination between cold'' and hot'' non-baryonic candidates is shown to depend on the assumed seeds'' that stimulate structure formation. Gaussian density fluctuations, such as those induced by quantum fluctuations, favor cold dark matter, whereas topological defects such as strings, textures or domain walls may work equally or better with hot dark matter. A possible connection between cold dark matter, globular cluster ages and the Hubble constant is mentioned. Recent large-scale structure measurements, coupled with microwave anisotropy limits, are shown to raise some questions for the previously favored density fluctuation picture. Accelerator and underground limits on dark matter candidates are also reviewed.

  19. Dark matter and cosmology

    International Nuclear Information System (INIS)

    Schramm, D.N.

    1992-03-01

    The cosmological dark matter problem is reviewed. The Big Bang Nucleosynthesis constraints on the baryon density are compared with the densities implied by visible matter, dark halos, dynamics of clusters, gravitational lenses, large-scale velocity flows, and the Ω = 1 flatness/inflation argument. It is shown that (1) the majority of baryons are dark; and (2) non-baryonic dark matter is probably required on large scales. It is also noted that halo dark matter could be either baryonic or non-baryonic. Descrimination between ''cold'' and ''hot'' non-baryonic candidates is shown to depend on the assumed ''seeds'' that stimulate structure formation. Gaussian density fluctuations, such as those induced by quantum fluctuations, favor cold dark matter, whereas topological defects such as strings, textures or domain walls may work equally or better with hot dark matter. A possible connection between cold dark matter, globular cluster ages and the Hubble constant is mentioned. Recent large-scale structure measurements, coupled with microwave anisotropy limits, are shown to raise some questions for the previously favored density fluctuation picture. Accelerator and underground limits on dark matter candidates are also reviewed

  20. RPP Environmental Permits and Related Documentation

    International Nuclear Information System (INIS)

    DEXTER, M.L.

    2001-01-01

    This document contains the current list of environmental permits and related documentation for RPP facilities and activities. Copies of these permits and related approvals are maintained by RPP Environmental. In addition, notices of Correction and Notices of Violation are issued by State and Federal Regulators which are tracked by RPP Environmental to resolve any recently identified deficiencies. A listing of these recent Notices is provided as an attachment to this document. These permits, approval conditions, and recent regulatory agency notices, constitute an important element of the RPP Authorization Envelope. Permits are issued frequently and the reader is advised to check with RPP environmental for new permits or approval conditions. Interpretation of permit or approval conditions should be coordinated with RPP Environmental. This document is updated on a quarterly basis

  1. RPP Environmental Permits and Related Documentation

    International Nuclear Information System (INIS)

    DEXTER, M.L.

    2000-01-01

    This document contains the current list of environmental permits and related documentation for RPP facilities and activities. Copies of these permits and related approvals are maintained by RPP Environmental. In addition, Notices of Correction and Notices of Violation are issued by State and Federal Regulators which are tracked by RPP Environmental to resolve any recently identified deficiencies. A listing of these recent Notices is provided as an attachment to this document. These permits, approval conditions, and recent regulatory agency notices, constitute an important element of the RPP Authorization Envelope. Permits are issued frequently and the reader is advised to check with RPP environmental for new permits or approval conditions. Interpretation of permit or approval conditions should be coordinated with RPP Environmental. This document will be updated on a quarterly basis

  2. 50 CFR 22.23 - What are the requirements for permits to take depredating eagles and eagles that pose a risk to...

    Science.gov (United States)

    2010-10-01

    ... the following conditions: (1) Bald or golden eagles may be taken under permit by firearms, traps, or other suitable means except by poison or from aircraft; (2) The taking of eagles under permit may be... take bald or golden eagles unless the Director has determined that such taking is compatible with the...

  3. 76 FR 57757 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-09-16

    ... a Federal permit is issued that allows such activities. The ESA law requires that we invite public... laws and regulations. We will not consider or include in our administrative record comments we receive....) held in zoos in the United States to the Department of Anthropology, University of Cambridge, Cambridge...

  4. ADMX Dark-Matter Axion Search

    International Nuclear Information System (INIS)

    Rosenberg, Leslie J.

    2004-01-01

    The axion, a hypothetical elementary particle, emerged from a compelling solution to the Strong-CP Problem in QCD. Subsequently, the axion was recognized to be a good Cold Dark Matter candidate. Although dark-matter axions have only feeble couplings to matter and radiation, these axions may be detected through resonant conversion of axions into microwave photons in a high-Q cavity threaded by a strong static magnetic field. This technique is at present the only means whereby dark-matter axions with plausible couplings may be detected at the required sensitivity. This talk describes recent results from the Axion Dark Matter Experiment (ADMX), now the world's most sensitive search for axions. There will also be a short overview of the ADMX upgrade, which promises sensitivity to even the more feebly coupled dark matter axions even should they make up only a minority fraction of the local dark matter halo

  5. Proposal for education. Education in radiation protection and equipment handling for personnel in X-ray applications that require permits

    International Nuclear Information System (INIS)

    1995-06-01

    Some stipulations are connected to the permits to use X-ray equipment for medical purposes, one of which is education of the personnel. At inspections SSI has found serious deficiencies in these educations. The quality of the education has large variations over the country, and at some hospitals it does not exist at all. In order to help the permit holders to increase the quality of the education, a proposal to a course has been worked out. The proposal contains advice on content and scope and disposition of the education for different categories of personnel

  6. TANK FARM ENVIRONMENTAL REQUIREMENTS

    International Nuclear Information System (INIS)

    TIFFT, S.R.

    2003-01-01

    Through regulations, permitting or binding negotiations, Regulators establish requirements, limits, permit conditions and Notice of Construction (NOC) conditions with which the Office of River Protection (ORP) and the Tank Farm Contractor (TFC) must comply. Operating Specifications are technical limits which are set on a process to prevent injury to personnel, or damage to the facility or environment, The main purpose of this document is to provide specification limits and recovery actions for the TFC Environmental Surveillance Program at the Hanford Site. Specification limits are given for monitoring frequencies and permissible variation of readings from an established baseline or previous reading. The requirements in this document are driven by environmental considerations and data analysis issues, rather than facility design or personnel safety issues. This document is applicable to all single-shell tank (SST) and double-shell tank (DST) waste tanks, and the associated catch tanks and receiver tanks, and transfer systems. This Tank Farm Environmental Specifications Document (ESD) implements environmental-regulatory limits on the configuration and operation of the Hanford Tank Farms facility that have been established by Regulators. This ESD contains specific field operational limits and recovery actions for compliance with airborne effluent regulations and agreements, liquid effluents regulations and agreements, and environmental tank system requirements. The scope of this ESD is limited to conditions that have direct impact on Operations/Projects or that Operations Projects have direct impact upon. This document does not supercede or replace any Department of Energy (DOE) Orders, regulatory permits, notices of construction, or Regulatory agency agreements binding on the ORP or the TFC. Refer to the appropriate regulation, permit, or Notice of Construction for an inclusive listing of requirements

  7. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations

  8. State waste discharge permit application 400 Area secondary cooling water. Revision 2

    International Nuclear Information System (INIS)

    1996-01-01

    This document constitutes the Washington Administrative Code 173-216 State Waste Discharge Permit Application that serves as interim compliance as required by Consent Order DE 91NM-177, for the 400 Area Secondary Cooling Water stream. As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site that affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 of the Washington Administrative Code, the State Waste Discharge Permitting Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order DE 91NM-177. The Consent Order DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. Based upon compositional and flow rate characteristics, liquid effluent streams on the Hanford Site have been categorized into Phase 1, Phase 2, and Miscellaneous streams. This document only addresses the 400 Area Secondary Cooling Water stream, which has been identified as a Phase 2 stream. The 400 Area Secondary Cooling Water stream includes contribution streams from the Fuels and Materials Examination Facility, the Maintenance and Storage Facility, the 481-A pump house, and the Fast Flux Test Facility

  9. Nucleon-nucleon correlations in dense nuclear matter

    International Nuclear Information System (INIS)

    Alm, T.

    1993-02-01

    In this thesis new results on the problematics of the formation of nucleon-nucleon correlations in nuclear matter could be presented. Starting from a general study of the two-particle problem in matter we studied the occurrence of a suprafluid phase (pair condensate of nucleons). The Gorkov decoupling by means of anomalous Green functions was generalized, so that also Cooper pairs with spin 1 (triplet pairing) can be described. A generalized gap equation resulted, which permits to determine the order parameters of the suprafluied phase in arbitrary channels of the nucleon-nucleon scattering states. This equation was solvd in the 1 S 0 -, in the 3 P 2 - 3 F 2 , and in the 3 S 1 - 3 D 1 channel under application of realistic nucleon-nucleon potentials. The behaviour of the resulting gap parameters in the single channels was studied as function of density and temperature. (orig.) [de

  10. QCD Axion Dark Matter with a Small Decay Constant.

    Science.gov (United States)

    Co, Raymond T; Hall, Lawrence J; Harigaya, Keisuke

    2018-05-25

    The QCD axion is a good dark matter candidate. The observed dark matter abundance can arise from misalignment or defect mechanisms, which generically require an axion decay constant f_{a}∼O(10^{11})  GeV (or higher). We introduce a new cosmological origin for axion dark matter, parametric resonance from oscillations of the Peccei-Quinn symmetry breaking field, that requires f_{a}∼(10^{8}-10^{11})  GeV. The axions may be warm enough to give deviations from cold dark matter in large scale structure.

  11. Dark matter universe.

    Science.gov (United States)

    Bahcall, Neta A

    2015-10-06

    Most of the mass in the universe is in the form of dark matter--a new type of nonbaryonic particle not yet detected in the laboratory or in other detection experiments. The evidence for the existence of dark matter through its gravitational impact is clear in astronomical observations--from the early observations of the large motions of galaxies in clusters and the motions of stars and gas in galaxies, to observations of the large-scale structure in the universe, gravitational lensing, and the cosmic microwave background. The extensive data consistently show the dominance of dark matter and quantify its amount and distribution, assuming general relativity is valid. The data inform us that the dark matter is nonbaryonic, is "cold" (i.e., moves nonrelativistically in the early universe), and interacts only weakly with matter other than by gravity. The current Lambda cold dark matter cosmology--a simple (but strange) flat cold dark matter model dominated by a cosmological constant Lambda, with only six basic parameters (including the density of matter and of baryons, the initial mass fluctuations amplitude and its scale dependence, and the age of the universe and of the first stars)--fits remarkably well all the accumulated data. However, what is the dark matter? This is one of the most fundamental open questions in cosmology and particle physics. Its existence requires an extension of our current understanding of particle physics or otherwise point to a modification of gravity on cosmological scales. The exploration and ultimate detection of dark matter are led by experiments for direct and indirect detection of this yet mysterious particle.

  12. 9 CFR 93.319 - Import permit and declaration for horses.

    Science.gov (United States)

    2010-01-01

    ... horses. 93.319 Section 93.319 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE...; REQUIREMENTS FOR MEANS OF CONVEYANCE AND SHIPPING CONTAINERS Horses Central America and the West Indies 17 § 93.319 Import permit and declaration for horses. For all horses offered for importation from regions of...

  13. 9 CFR 93.315 - Import permit and declaration for horses.

    Science.gov (United States)

    2010-01-01

    ... horses. 93.315 Section 93.315 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE...; REQUIREMENTS FOR MEANS OF CONVEYANCE AND SHIPPING CONTAINERS Horses Canada 16 § 93.315 Import permit and declaration for horses. For all horses offered for importation from Canada, the importer or his or her agent...

  14. Matter in transition

    International Nuclear Information System (INIS)

    Anderson, Lara B.; Gray, James; Raghuram, Nikhil; Taylor, Washington

    2016-01-01

    We explore a novel type of transition in certain 6D and 4D quantum field theories, in which the matter content of the theory changes while the gauge group and other parts of the spectrum remain invariant. Such transitions can occur, for example, for SU(6) and SU(7) gauge groups, where matter fields in a three-index antisymmetric representation and the fundamental representation are exchanged in the transition for matter in the two-index antisymmetric representation. These matter transitions are realized by passing through superconformal theories at the transition point. We explore these transitions in dual F-theory and heterotic descriptions, where a number of novel features arise. For example, in the heterotic description the relevant 6D SU(7) theories are described by bundles on K3 surfaces where the geometry of the K3 is constrained in addition to the bundle structure. On the F-theory side, non-standard representations such as the three-index antisymmetric representation of SU(N) require Weierstrass models that cannot be realized from the standard SU(N) Tate form. We also briefly describe some other situations, with groups such as Sp(3), SO(12), and SU(3), where analogous matter transitions can occur between different representations. For SU(3), in particular, we find a matter transition between adjoint matter and matter in the symmetric representation, giving an explicit Weierstrass model for the F-theory description of the symmetric representation that complements another recent analogous construction.

  15. State Waste Discharge Permit application, 183-N Backwash Discharge Pond

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE91NM-177 requires a series of permitting activities for liquid effluent discharges. Liquid effluents on the Hanford Site have been classified as Phase I, Phase II, and Miscellaneous Streams. The Consent Order No. DE91NM-177 establishes milestones for State Waste Discharge Permit application submittals for all Phase I and Phase II streams, as well as the following 11 Miscellaneous Streams as identified in Table 4 of the Consent Order No. DE91NM-177.

  16. AIR PERMIT COMPLIANCE FOR WASTE RETRIEVAL OEPRATIONS INVOLVING MULTI-UNIT EMISSIONS

    International Nuclear Information System (INIS)

    SIMMONS FM

    2007-01-01

    Since 1970, approximately 38,000 suspect-transuranic and transuranic waste containers have been placed in retrievable storage on the Hanford Site in the 200 Areas burial grounds. Hanford's Waste Retrieval Project is retrieving these buried containers and processing them for safe storage and disposition. Container retrieval activities require an air emissions permit to account for potential emissions of radionuclides. The air permit covers the excavation activities as well as activities associated with assaying containers and installing filters in the retrieved transuranic containers lacking proper venting devices. Fluor Hanford, Inc. is required to track radioactive emissions resulting from the retrieval activities. Air, soil, and debris media contribute to the emissions and enabling assumptions allow for calculation of emissions. Each of these activities is limited to an allowed annual emission (per calendar year) and .contributes to the overall total emissions allowed for waste retrieval operations. Tracking these emissions is required to ensure a permit exceedance does not occur. A tracking tool was developed to calculate potential emissions in real time sense. Logic evaluations are established within the tracking system to compare real time data against license limits to ensure values are not exceeded for either an individual activity or the total limit. Data input are based on field survey and workplace air monitoring activities. This tracking tool is used monthly and quarterly to verify compliance to the license limits. Use of this tool has allowed Fluor Hanford, Inc. to successfully retrieve a significant number of containers in a safe manner without any exceedance of emission limits

  17. Pacific Islands Region Fishing Permits

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Sustainable Fisheries Division Permits Program issues around 300 permits annually for pelagic longline and troll & handline, bottomfish, crustacean (lobster...

  18. The efficiency and equity of marketable permits for CO2 emissions

    International Nuclear Information System (INIS)

    Rose, A.; Stevens, B.

    1993-01-01

    This paper examines the efficiency and equity implications of alternative assignments of marketable permits for carbon dioxide. A non-linear programming model is used to estimate the net welfare changes of permit allocations based on Sovereignty and Rawlsian equity criteria for 8 countries/regions covering the spectrum of economic development levels. The net welfare gains associated with an overall 20% reduction in CO 2 emissions are estimated to be nearly 20 billion dollars, an increase of several billion dollars over a system of inflexible emission quotas requiring 20% abatement in each country. Also, although the welfare changes implied by alternative permit assignments may vary greatly between countries before trading, the trading process significantly reduces the disparities. This result stems from the Coase Theorem, which implies a uniquely efficient outcome. That is, individual country abatement levels and, hence, costs, are the same under all permit assignments after trading, and net welfare for a given nation differs only by the amount of permit revenues/expenditures associated with the application of alternative equity criteria. Foremost among the paper's policy implications is that although equity criteria may differ significantly in principle, their welfare implications in practice may be very similar for various subsets of these criteria. This should reduce tensions at the bargaining table and facilitate the negotiation of greenhouse gas agreements. 52 refs., 3 figs., 8 tabs

  19. Linear scale bounds on dark matter--dark radiation interactions and connection with the small scale crisis of cold dark matter

    DEFF Research Database (Denmark)

    Hannestad, Steen; Archidiacono, Maria; Bohr, Sebastian

    2017-01-01

    One of the open questions in modern cosmology is the small scale crisis of the cold dark matter paradigm. Increasing attention has recently been devoted to self-interacting dark matter models as a possible answer. However, solving the so-called "missing satellites" problem requires in addition...... the presence of an extra relativistic particle (dubbed dark radiation) scattering with dark matter in the early universe. Here we investigate the impact of different theoretical models devising dark matter dark radiation interactions on large scale cosmological observables. We use cosmic microwave background...... data to put constraints on the dark radiation component and its coupling to dark matter. We find that the values of the coupling allowed by the data imply a cut-off scale of the halo mass function consistent with the one required to match the observations of satellites in the Milky Way....

  20. Gravitational closure of matter field equations

    Science.gov (United States)

    Düll, Maximilian; Schuller, Frederic P.; Stritzelberger, Nadine; Wolz, Florian

    2018-04-01

    The requirement that both the matter and the geometry of a spacetime canonically evolve together, starting and ending on shared Cauchy surfaces and independently of the intermediate foliation, leaves one with little choice for diffeomorphism-invariant gravitational dynamics that can equip the coefficients of a given system of matter field equations with causally compatible canonical dynamics. Concretely, we show how starting from any linear local matter field equations whose principal polynomial satisfies three physicality conditions, one may calculate coefficient functions which then enter an otherwise immutable set of countably many linear homogeneous partial differential equations. Any solution of these so-called gravitational closure equations then provides a Lagrangian density for any type of tensorial geometry that features ultralocally in the initially specified matter Lagrangian density. Thus the given system of matter field equations is indeed closed by the so obtained gravitational equations. In contrast to previous work, we build the theory on a suitable associated bundle encoding the canonical configuration degrees of freedom, which allows one to include necessary constraints on the geometry in practically tractable fashion. By virtue of the presented mechanism, one thus can practically calculate, rather than having to postulate, the gravitational theory that is required by specific matter field dynamics. For the special case of standard model matter one obtains general relativity.

  1. Jeans instability and antiscreening in the system of matter-antimatter with antigravitation

    International Nuclear Information System (INIS)

    Trigger, S A; Gribov, I A

    2015-01-01

    The hypothesis of antigravitational interaction of elementary particles and antiparticles is applied to the simple two-component hydrodynamic model Λ-CDM (Lambda cold-dark matter) with gravitational repulsion and attraction. An increase in the Jeans instability rate, the presence of antiscreening, and the dominant role of the gravitational repulsion as a possible mechanism of spatial separation of matter and antimatter in the Universe are shown, as well as the observable acceleration of far galaxies. The sound wave is found for the two-component gravitational-antigravitational system. The suggested approach permits to reestablish the idea about baryon symmetry of the Universe, causing its steady large-scale flatness and accelerated Universe expansion. (paper)

  2. 78 FR 58568 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2013-09-24

    ... certain animals and certain geographic areas a requiring special protection. The regulations establish such a permit system to designate Antarctic Specially Protected Areas. Application Details 1. Applicant... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic...

  3. 78 FR 53789 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2013-08-30

    ... certain animals and certain geographic areas a requiring special protection. The regulations establish such a permit system to designate Antarctic Specially Protected Areas. Application Details 1. Applicant... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic...

  4. Light dark matter through assisted annihilation

    International Nuclear Information System (INIS)

    Dey, Ujjal Kumar; Maity, Tarak Nath; Ray, Tirtha Sankar

    2017-01-01

    In this paper we investigate light dark matter scenarios where annihilation to Standard Model particles at tree-level is kinematically forbidden. In such cases annihilation can be aided by massive Standard Model-like species, called assisters , in the initial state that enhances the available phase space opening up novel tree-level processes. We investigate the feasibility of such non-standard assisted annihilation processes to reproduce the observed relic density of dark matter. We present a simple scalar dark matter-scalar assister model where this is realised. We find that if the dark matter and assister are relatively degenerate the required relic density can be achieved for a keV-MeV scale dark matter. We briefly discuss the cosmological constraints on such dark matter scenarios.

  5. Can the flyby anomaly be attributed to earth-bound dark matter?

    International Nuclear Information System (INIS)

    Adler, Stephen L.

    2009-01-01

    We make preliminary estimates to assess whether the recently reported flyby anomaly can be attributed to dark matter interactions. We consider both elastic and exothermic inelastic scattering from dark matter constituents; for isotropic dark matter velocity distributions, the former decrease, while the latter increase, the final flyby velocity. The fact that the observed flyby velocity anomaly shows examples with both positive and negative signs, requires the dominance of different dark matter scattering processes along different flyby trajectories. The magnitude of the observed anomalies requires dark matter densities many orders of magnitude greater than the galactic halo density. Such a large density could result from an accumulation cascade, in which the solar system-bound dark matter density is much higher than the galactic halo density, and the earth-bound density is much higher than the solar system-bound density. We discuss a number of strong constraints on the hypothesis of a dark matter explanation for the flyby anomaly. These require dark matter to be non-self-annihilating, with the dark matter scattering cross section on nucleons much larger, and the dark matter mass much lighter, than usually assumed.

  6. ALASKA OIL AND GAS EXPLORATION, DEVELOPMENT, AND PERMITTING PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Richard McMahon; Robert Crandall; Chas Dense; Sean Weems

    2003-08-04

    The objective of this project is to eliminate three closely inter-related barriers to oil production in Alaska through the use of a geographic information system (GIS) and other information technology strategies. These barriers involve identification of oil development potential from existing wells, planning projects to efficiently avoid conflicts with other interests, and gaining state approvals for exploration and development projects. Each barrier is the result of either current labor-intensive methods or poorly accessible information. This project brings together three parts of the oil exploration, development, and permitting process to form the foundation for a more fully integrated information technology infrastructure for the State of Alaska. This web-based system will enable the public and other review participants to track permit status, submit and view comments, and obtain important project information online. By automating several functions of the current manual process, permit applications will be completed more quickly and accurately, and agencies will be able to complete reviews with fewer delays. The application will include an on-line diagnostic Coastal Project Questionnaire to determine the suite of permits required for a specific project. The application will also automatically create distribution lists based on the location and type of project, populate document templates for project review start-ups, public notices and findings, allow submission of e-comments, and post project status information on the Internet. Alaska has nearly one-quarter of the nation's supply of crude oil, at least five billion barrels of proven reserves. The American Association of Petroleum Geologists report that the 1995 National Assessment identified the North Slope as having 7.4 billion barrels of technically recoverable oil and over 63 trillion cubic feet of natural gas. From these reserves, Alaska produces roughly one-fifth of the nation's daily crude oil

  7. 7 CFR 319.75-3 - Permits.

    Science.gov (United States)

    2010-01-01

    ... Animal and Plant Health Inspection Service, Plant Protection and Quarantine, Port Operations, Permit Unit... article may be imported only after issuance of a written permit by Plant Protection and Quarantine. (b) An application for a written permit should be submitted to the Animal and Plant Health Inspection Service, Plant...

  8. Honda Permits to Install 1 Year Aggregation

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  9. PSD Permit for the Marblehead Lime Company

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  10. Asymmetric condensed dark matter

    Energy Technology Data Exchange (ETDEWEB)

    Aguirre, Anthony; Diez-Tejedor, Alberto, E-mail: aguirre@scipp.ucsc.edu, E-mail: alberto.diez@fisica.ugto.mx [Santa Cruz Institute for Particle Physics and Department of Physics, University of California, Santa Cruz, CA, 95064 (United States)

    2016-04-01

    We explore the viability of a boson dark matter candidate with an asymmetry between the number densities of particles and antiparticles. A simple thermal field theory analysis confirms that, under certain general conditions, this component would develop a Bose-Einstein condensate in the early universe that, for appropriate model parameters, could survive the ensuing cosmological evolution until now. The condensation of a dark matter component in equilibrium with the thermal plasma is a relativistic process, hence the amount of matter dictated by the charge asymmetry is complemented by a hot relic density frozen out at the time of decoupling. Contrary to the case of ordinary WIMPs, dark matter particles in a condensate must be lighter than a few tens of eV so that the density from thermal relics is not too large. Big-Bang nucleosynthesis constrains the temperature of decoupling to the scale of the QCD phase transition or above. This requires large dark matter-to-photon ratios and very weak interactions with standard model particles.

  11. Dark matter universe

    Science.gov (United States)

    Bahcall, Neta A.

    2015-01-01

    Most of the mass in the universe is in the form of dark matter—a new type of nonbaryonic particle not yet detected in the laboratory or in other detection experiments. The evidence for the existence of dark matter through its gravitational impact is clear in astronomical observations—from the early observations of the large motions of galaxies in clusters and the motions of stars and gas in galaxies, to observations of the large-scale structure in the universe, gravitational lensing, and the cosmic microwave background. The extensive data consistently show the dominance of dark matter and quantify its amount and distribution, assuming general relativity is valid. The data inform us that the dark matter is nonbaryonic, is “cold” (i.e., moves nonrelativistically in the early universe), and interacts only weakly with matter other than by gravity. The current Lambda cold dark matter cosmology—a simple (but strange) flat cold dark matter model dominated by a cosmological constant Lambda, with only six basic parameters (including the density of matter and of baryons, the initial mass fluctuations amplitude and its scale dependence, and the age of the universe and of the first stars)—fits remarkably well all the accumulated data. However, what is the dark matter? This is one of the most fundamental open questions in cosmology and particle physics. Its existence requires an extension of our current understanding of particle physics or otherwise point to a modification of gravity on cosmological scales. The exploration and ultimate detection of dark matter are led by experiments for direct and indirect detection of this yet mysterious particle. PMID:26417091

  12. 78 FR 12415 - Notice of Applications for Modification of Special Permit

    Science.gov (United States)

    2013-02-22

    ... hazardous materials, packaging design changes, additional mode of transportation, etc.) are described in... 173.302(a), permit to authorize Columbus, OH. 173.304(a), a Class 8 packaging 173.304(d), group I... seamless stainless steel type 304 packaging and remove requirements when reoffered for transportation...

  13. Annual Hanford Site Environmental Permitting status report

    International Nuclear Information System (INIS)

    SONNICHSEN, J.C.

    1999-01-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies

  14. Norm in the matter of safeguards

    International Nuclear Information System (INIS)

    Saavedra, Analia; Maceiras, Elena; Valentino, Lucia; Chiliutti, Mauro

    2001-01-01

    The Nuclear Regulatory Authority (NRA), through its norm, establishes requirements in the matter of safeguards that allow him to control the fulfillment of the objectives established at national level and the international commitments that the Argentine Republic has assumed in the scope of Nuclear Non-proliferation. The measures of fortification of the safeguards proposed by the International Atomic Energy Agency (IAEA), will imply new obligations for the country and consequently it will require the update of the effective norm in the matter. The objective of this work is to describe the reach of the update of the norm in the matter of safeguards and their relation with some procedures of application in the scope of the radiological protection and the nuclear security

  15. 75 FR 62891 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2010-10-13

    ... requiring special protection. The regulations establish such a permit system to designate Antarctic... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic... Applications Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National...

  16. 76 FR 52354 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2011-08-22

    ... requiring special protection. The regulations establish such a permit system to designate Antarctic... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic... Applications Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National...

  17. 75 FR 75501 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2010-12-03

    ... requiring special protection. The regulations establish such a permit system to designate Antarctic... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic... applications received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National...

  18. 76 FR 58843 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2011-09-22

    ... requiring special protection. The regulations establish such a permit system to designate Antarctic... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic... Applications Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National...

  19. Financial qualifications review of applicants for nuclear power plant construction permits

    International Nuclear Information System (INIS)

    Hendrickson, P.L.; Mullen, M.F.; Carr, D.B.

    1988-09-01

    The NRC and its predecessor the AEC have had a regulatory requirement since 1956 that utilities seeking a construction permit for a nuclear power plant be financially qualified to construct and operate the plant. Several amendments to the requirements were made over the years including an attempt in 1982 to drop financial qualification review for electric utilities. This attempt was subsequently found invalid by a federal court. Nevertheless, financial qualification reviews consume significant amounts of NRC staff time and time at Atomic Safety and Licensing Board hearings. The analysis reported in this study was conducted to determine whether there is any empirical evidence of a relationship between a utility's financial health at the time of its construction permits application and the subsequent safety performance of the operating plant. The principal financial measures used to test for this relationship were bond rating, interest coverage ratio, debt/asset ratio, debt/equity ratio, and rate of return on equity. The principal safety measure was the long-term average of the scores assigned the utility in four key areas by the NRC under the Systematic Assessment of Licensee Performance program. The results of the analysis showed no evidence of a relationship between financial health at the time of the construction permit and subsequent safety performance. 7 refs., 16 figs., 4 tabs

  20. Lean in Air Permitting Guide

    Science.gov (United States)

    The Lean in Air Permitting Guide is designed to help air program managers at public agencies better understand the potential value and results that can be achieved by applying Lean improvement methods to air permitting processes.

  1. ALASKA OIL AND GAS EXPLORATION, DEVELOPMENT, AND PERMITTING PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Richard McMahon; Robert Crandall; Chas Dense; Sean Weems

    2003-11-19

    This is the second technical report, covering the period from April 1, 2003 through September 30, 2003. This project brings together three parts of the oil exploration, development, and permitting process to form the foundation for a more fully integrated information technology infrastructure for the State of Alaska. The geo-technical component is a shared effort between the State Department of Administration and the US Department of Energy. The Alaska Oil and Gas Conservation Commission is rapidly converting high volumes of paper documents and geo-technical information to formats suitable for search and retrieval over the Internet. The permitting component is under the lead of the DNR Office of Project Management and Permitting. A web-based system will enable the public and other review participants to track permit status, submit and view comments, and obtain important project information on-line. By automating several functions of the current manual process, permit applications will be completed more quickly and accurately, and agencies will be able to complete reviews with fewer delays. Structural changes are taking place in terms of organization, statutory authority, and regulatory requirements. Geographic Information Systems are a central component to the organization of information, and the delivery of on-line services. Progress has been made to deploy the foundation system for the shared GIS based on open GIS protocols to the extent feasible. Alaska has nearly one-quarter of the nation's supply of crude oil, at least five billion barrels of proven reserves. The American Association of Petroleum Geologists report that the 1995 National Assessment identified the North Slope as having 7.4 billion barrels of technically recoverable oil and over 63 trillion cubic feet of natural gas. From these reserves, Alaska produces roughly one-fifth of the nation's daily crude oil production, or approximately one million barrels per day from over 1,800 active wells.

  2. Casting light on dark matter

    International Nuclear Information System (INIS)

    Ellis, John

    2012-01-01

    The prospects for detecting a candidate supersymmetric dark matter particle at the LHC are reviewed, and compared with the prospects for direct and indirect searches for astrophysical dark matter. The discussion is based on a frequentist analysis of the preferred regions of the Minimal supersymmetric extension of the Standard Model with universal soft supersymmetry breaking (the CMSSM). LHC searches may have good chances to observe supersymmetry in the near future - and so may direct searches for astrophysical dark matter particles, whereas indirect searches may require greater sensitivity, at least within the CMSSM.

  3. Dark matter in and around stars

    International Nuclear Information System (INIS)

    Sivertsson, Sofia

    2009-01-01

    There is by now compelling evidence that most of the matter in the universe is in the form of dark matter, a form of matter quite different from the matter we experience in every day life. The gravitational effects of this dark matter have been observed in many different ways but its true nature is still unknown. In most models dark matter particles can annihilate with each other into standard model particles. The direct or indirect observation of such annihilation products could give important clues for the dark matter puzzle. For signals from dark matter annihilations to be detectable, typically high dark matter densities are required. Massive objects, such as stars, can increase the local dark matter density both via scattering off nucleons and by pulling in dark matter gravitationally as the star forms. Dark matter annihilations outside the star would give rise to gamma rays and this is discussed in the first paper. Furthermore dark matter annihilations inside the star would deposit energy inside the star which, if abundant enough, could alter the stellar evolution. Aspects of this are investigated in the second paper. Finally, local dark matter over densities formed in the early universe could still be around today; prospects of detecting gamma rays from such clumps are discussed in the third paper

  4. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 2 appendices covering engineering drawings and operating procedures

  5. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constitutents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 2 Appendices covering engineering drawings and operating procedures

  6. Grout Treatment Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 14 Appendices. Topics include Engineering Drawings, Maps, Roads, Toxicity Testing, and Pilot-Scale Testing

  7. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Science.gov (United States)

    2010-07-01

    ... WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Special Forms of Permits § 270.62 Hazardous waste incinerator permits. When an owner or operator of a hazardous waste... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Hazardous waste incinerator permits...

  8. Annual Hanford Site Environmental Permitting Status Report

    International Nuclear Information System (INIS)

    HOMAN, N.A.

    2000-01-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. This status report also addresses Permit Condition I.E.22, as interpreted in Section 12.1.25 of the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Rev. 4), that states this report will be prepared annually and a copy of this report will be placed in the Facility Operating Record, General Information file by October 1 of each year

  9. Permit trading and credit trading

    DEFF Research Database (Denmark)

    Boom, Jan-Tjeerd; R. Dijstra, Bouwe

    This paper compares emissions trading based on a cap on total emissions (permit trading) and on relative standards per unit of output (credit trading). Two types of market structure are considered: perfect competition and Cournot oligopoly. We find that output, abatement costs and the number...... of firms are higher under credit trading. Allowing trade between permit-trading and credit-trading sectors may increase in welfare. With perfect competition, permit trading always leads to higher welfare than credit trading. With imperfect competition, credit trading may outperform permit trading....... Environmental policy can lead to exit, but also to entry of firms. Entry and exit have a profound impact on the performance of the schemes, especially under imperfect competition. We find that it may be impossible to implement certain levels of total industry emissions. Under credit trading several levels...

  10. State waste discharge permit application, 200-E chemical drain field

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field.

  11. State waste discharge permit application, 200-E chemical drain field

    International Nuclear Information System (INIS)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field

  12. 50 CFR 17.22 - Permits for scientific purposes, enhancement of propagation or survival, or for incidental taking.

    Science.gov (United States)

    2010-10-01

    ... where the life or health of an endangered animal is threatened and no reasonable alternative is... covered by the permit in a manner which would not cause the death or removal from the wild of such... purpose for which the permit is required would be likely to reduce the threat of extinction facing the...

  13. Lithium and the nature of dark matter

    International Nuclear Information System (INIS)

    Reeves, H.

    1988-01-01

    Limits on the value of critical temperature of the quark-hadron phase transition, evaluated by chiral perturbation calculations, are discussed in the frame of primordial nucleosynthesis. The yield of lithium is compatible with the Pop II data in approximately the same range as in the case of homogeneous baryonic density models. Taking into account various factors in the search for the initial abundance of the cosmological isotopes, it appears very likely that most of the baryonic matter is not luminous and that most of the dark matter is non-baryonic. However pushing all the uncertainties to their extremes, it seems also that we do not necessarily require baryonic dark matter and, we do not necessarily require non-baryonic dark matter. The uncertainty in the value of the Hubble parameter remains one of the largest source of uncertainty in this analysis

  14. Noncooperative models of permit markets

    Energy Technology Data Exchange (ETDEWEB)

    Godal, Odd

    2011-07-15

    The applicability of some popular and basic permit market theories has been questioned. Drawing on noncooperative equilibrium theory for pure exchange economies, this article adapts several well-established alternative models to permit exchange. Some qualitative properties of the associated equilibria are provided, including two games with equilibria that in a sense coincide. Nevertheless, as there exist quite a few models potentially applicable to emissions trading, with equilibria that range from autarky to Pareto optimality, it seems that economics lacks a broadly accepted basic theory for permit markets. (Author)

  15. 78 FR 54685 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2013-09-05

    ... certain geographic areas a requiring special protection. The regulations establish such a permit system to... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic... Applications Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National...

  16. 78 FR 52218 - Notice of permit applications received under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2013-08-22

    ... certain geographic areas a requiring special protection. The regulations establish such a permit system to... NATIONAL SCIENCE FOUNDATION Notice of permit applications received under the Antarctic... applications received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National...

  17. 78 FR 56247 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Science.gov (United States)

    2013-09-12

    ... certain geographic areas a requiring special protection. The regulations establish such a permit system to... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic... Applications Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National...

  18. 78 FR 70042 - Proposed Issuance of the NPDES General Permit for Oil and Gas Geotechnical Surveying and Related...

    Science.gov (United States)

    2013-11-22

    ... be provided orally or in written format. Commenters providing verbal comments are encouraged to... Act (APA), or any other law, to publish general notice of proposed rulemaking.'' The RFA exempts from... permits are permits, not rulemakings, under the APA and thus not subject to APA rulemaking requirements or...

  19. 40 CFR 122.22 - Signatories to permit applications and reports (applicable to State programs, see § 123.25).

    Science.gov (United States)

    2010-07-01

    ... POLLUTANT DISCHARGE ELIMINATION SYSTEM Permit Application and Special NPDES Program Requirements § 122.22... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Signatories to permit applications and reports (applicable to State programs, see § 123.25). 122.22 Section 122.22 Protection of Environment...

  20. 300 Area TEDF NPDES Permit Compliance Monitoring Plan

    International Nuclear Information System (INIS)

    Loll, C.M.

    1994-01-01

    This monitoring plan describes the activities and methods that will be employed at the 300 Area Treated Effluent Disposal Facility (TEDF) in order to ensure compliance with the National Discharge Elimination System (NPDES) permit. Included in this document are a brief description of the project, the specifics of the sampling effort, including the physical location and frequency of sampling, the support required for sampling, and the Quality Assurance (QA) protocols to be followed in the sampling procedures

  1. 21 CFR 108.12 - Manufacturing, processing, or packing without a permit, or in violation of a permit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false Manufacturing, processing, or packing without a permit, or in violation of a permit. 108.12 Section 108.12 Food and Drugs FOOD AND DRUG ADMINISTRATION... General Provisions § 108.12 Manufacturing, processing, or packing without a permit, or in violation of a...

  2. 40 CFR 60.4124 - Hg budget permit revisions.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Hg budget permit revisions. 60.4124... Coal-Fired Electric Steam Generating Units Permits § 60.4124 Hg budget permit revisions. Except as provided in § 60.4123(b), the permitting authority will revise the Hg Budget permit, as necessary, in...

  3. The dark matter distribution of M87 and NGC 1399

    Science.gov (United States)

    Tsai, John C.

    1993-01-01

    Recent X-ray observations of clusters of galaxies indicate that, outside the innermost about 100 kpc region, the ratio of dark matter density to baryonic matter density declines with radius. We show that this result is consistent with a cold dark matter simulation, suggesting the presence of dissipationless dark matter in the observed clusters. This is contrary to previous suggestions that dissipational baryonic dark matter is required to explain the decline in the density ratio. The simulation further shows that, in the inner 100 kpc region, the density ratio should rise with radius. We confirm this property in M87 and NGC 1399, which are close enough to allow the determination of the density ratio in the required inner region. X-ray mappings of the dark matter distribution in clusters of galaxies are therefore consistent with the presence of dissipationless dark matter.

  4. EPA Region 2 Discharge Pipes for Facilites with NPDES Permits from the Permit Compliance GIS Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Permit and Compliance System (PCS) contains data on the National Pollution Discharge Elimination Systems (NPDES) permit-holding facilities. This includes...

  5. Feed tank transfer requirements

    Energy Technology Data Exchange (ETDEWEB)

    Freeman-Pollard, J.R.

    1998-09-16

    This document presents a definition of tank turnover. Also, DOE and PC responsibilities; TWRS DST permitting requirements; TWRS Authorization Basis (AB) requirements; TWRS AP Tank Farm operational requirements; unreviewed safety question (USQ) requirements are presented for two cases (i.e., tank modifications occurring before tank turnover and tank modification occurring after tank turnover). Finally, records and reporting requirements, and documentation which will require revision in support of transferring a DST in AP Tank Farm to a privatization contractor are presented.

  6. Feed tank transfer requirements

    International Nuclear Information System (INIS)

    Freeman-Pollard, J.R.

    1998-01-01

    This document presents a definition of tank turnover. Also, DOE and PC responsibilities; TWRS DST permitting requirements; TWRS Authorization Basis (AB) requirements; TWRS AP Tank Farm operational requirements; unreviewed safety question (USQ) requirements are presented for two cases (i.e., tank modifications occurring before tank turnover and tank modification occurring after tank turnover). Finally, records and reporting requirements, and documentation which will require revision in support of transferring a DST in AP Tank Farm to a privatization contractor are presented

  7. Ci PERMIT

    CERN Multimedia

    Relations with the Host States Service

    1999-01-01

    The Swiss Permanent Mission to the International Organisations at Geneva recalls that only the spouses and children of members of personnel resident in Switzerland and in possession of a legitimation card of types 'B', 'C', 'D' or 'E' issued by the Swiss Federal Department of Foreign Affairs are entitled to benefit from a Ci Permit.The 'demande d'attestation de permis Ci' (request for a Ci permit attestation) can be sent to the Mission only through Personnel Division (Administrative Services, Office 33/1-025).Additional information on access by family members of CERN officials to the Swiss labour market are available to you on the Web site of the Relations with the Host States Service (cf. document entitled 'Employment in Switzerland for spouses and children of CERN officials' dated March 1996).Relations with the Host States Servicehttp://www.cern.ch/relations/Tel. 72848

  8. Offshore Wind Energy Permitting: A Survey of U.S. Project Developers

    Energy Technology Data Exchange (ETDEWEB)

    Van Cleve, Frances B.; Copping, Andrea E.

    2010-11-30

    The U.S. Department of Energy (DOE) has adopted a goal to generate 20% of the nation’s electricity from wind power by 2030. Achieving this “20% Wind Scenario” in 2030 requires acceleration of the current rate of wind project development. Offshore wind resources contribute substantially to the nation’s wind resource, yet to date no offshore wind turbines have been installed in the U.S. Progress developing offshore wind projects has been slowed by technological challenges, uncertainties about impacts to the marine environment, siting and permitting challenges, and viewshed concerns. To address challenges associated with siting and permitting, Pacific Northwest National Laboratory (PNNL) surveyed offshore wind project developers about siting and project development processes, their experience with the environmental permitting process, and the role of coastal and marine spatial planning (CMSP) in development of the offshore wind industry. Based on the responses to survey questions, we identify several priority recommendations to support offshore wind development. Recommendations also include considerations for developing supporting industries in the U.S. and how to use Coastal and Marine Spatial Planning (CMSP) to appropriately consider ocean energy among existing ocean uses. In this report, we summarize findings, discuss the implications, and suggest actions to improve the permitting and siting process.

  9. A Framework for Building Efficient Environmental Permitting Processes

    Directory of Open Access Journals (Sweden)

    Nicola Ulibarri

    2017-01-01

    Full Text Available Despite its importance as a tool for protecting air and water quality, and for mitigating impacts to protected species and ecosystems, the environmental permitting process is widely recognized to be inefficient and marked by delays. This article draws on a literature review and interviews with permitting practitioners to identify factors that contribute to delayed permit decisions. The sociopolitical context, projects that are complex or use novel technology, a fragmented and bureaucratic regulatory regime, serial permit applications and reviews, and applicant and permitting agency knowledge and resources each contribute to permitting inefficiency when they foster uncertainty, increase transaction costs, and allow divergent interests to multiply, yet remain unresolved. We then use the interviews to consider the potential of a collaborative dialogue between permitting agencies and applicants to mitigate these challenges, and argue that collaboration is well positioned to lessen permitting inefficiency.

  10. Task technical plan: DWPF air permit/dispersion modeling

    International Nuclear Information System (INIS)

    Lambert, D.P.

    1993-01-01

    This Task Technical Plan summarizes work required to project the benzene emissions from the Late Wash Facility (LWF) as well as update the benzene, mercury, and NO x emissions from the remainder of the Defense Waste Processing Facility (DWPF). These calculations will reflect (1) the addition of the LWF and (2) the replacement of formic acid with nitric acid in the melter preparation process. The completed calculations will be used to assist DWPF in applying for the LWF Air Quality Permit

  11. 77 FR 65864 - Receipt of an Application for Incidental Take Permit (16230)

    Science.gov (United States)

    2012-10-31

    .... This application includes endangered Kemp's ridley, leatherback, and hawksbill sea turtles and... Fisheries (NCDMF) pursuant to the Endangered Species Act of 1973, as amended (ESA). As required by the ESA... endangered or threatened species. The permit application is for the incidental take of ESA-listed adult and...

  12. Watershed-based point sources permitting strategy and dynamic permit-trading analysis.

    Science.gov (United States)

    Ning, Shu-Kuang; Chang, Ni-Bin

    2007-09-01

    Permit-trading policy in a total maximum daily load (TMDL) program may provide an additional avenue to produce environmental benefit, which closely approximates what would be achieved through a command and control approach, with relatively lower costs. One of the important considerations that might affect the effective trading mechanism is to determine the dynamic transaction prices and trading ratios in response to seasonal changes of assimilative capacity in the river. Advanced studies associated with multi-temporal spatially varied trading ratios among point sources to manage water pollution hold considerable potential for industries and policy makers alike. This paper aims to present an integrated simulation and optimization analysis for generating spatially varied trading ratios and evaluating seasonal transaction prices accordingly. It is designed to configure a permit-trading structure basin-wide and provide decision makers with a wealth of cost-effective, technology-oriented, risk-informed, and community-based management strategies. The case study, seamlessly integrating a QUAL2E simulation model with an optimal waste load allocation (WLA) scheme in a designated TMDL study area, helps understand the complexity of varying environmental resources values over space and time. The pollutants of concern in this region, which are eligible for trading, mainly include both biochemical oxygen demand (BOD) and ammonia-nitrogen (NH3-N). The problem solution, as a consequence, suggests an array of waste load reduction targets in a well-defined WLA scheme and exhibits a dynamic permit-trading framework among different sub-watersheds in the study area. Research findings gained in this paper may extend to any transferable dynamic-discharge permit (TDDP) program worldwide.

  13. Enlightening Students about Dark Matter

    Science.gov (United States)

    Hamilton, Kathleen; Barr, Alex; Eidelman, Dave

    2018-01-01

    Dark matter pervades the universe. While it is invisible to us, we can detect its influence on matter we can see. To illuminate this concept, we have created an interactive javascript program illustrating predictions made by six different models for dark matter distributions in galaxies. Students are able to match the predicted data with actual experimental results, drawn from several astronomy papers discussing dark matter’s impact on galactic rotation curves. Programming each new model requires integration of density equations with parameters determined by nonlinear curve-fitting using MATLAB scripts we developed. Using our javascript simulation, students can determine the most plausible dark matter models as well as the average percentage of dark matter lurking in galaxies, areas where the scientific community is still continuing to research. In that light, we strive to use the most up-to-date and accepted concepts: two of our dark matter models are the pseudo-isothermal halo and Navarro-Frenk-White, and we integrate out to each galaxy’s virial radius. Currently, our simulation includes NGC3198, NGC2403, and our own Milky Way.

  14. Dark matter in spiral galaxies

    International Nuclear Information System (INIS)

    Albada, T.S. van; Sancisi, R.

    1986-01-01

    Mass models of spiral galaxies based on the observed light distribution, assuming constant M/L for bulge and disc, are able to reproduce the observed rotation curves in the inner regions, but fail to do so increasingly towards and beyond the edge of the visible material. The discrepancy in the outer region can be accounted for by invoking dark matter; some galaxies require at least four times as much dark matter as luminous matter. There is no evidence for a dependence on galaxy luminosity or morphological type. Various arguments support the idea that a distribution of visible matter with constant M/L is responsible for the circular velocity in the inner region, i.e. inside approximately 2.5 disc scalelengths. Luminous matter and dark matter seem to 'conspire' to produce the flat observed rotation curves in the outer region. It seems unlikely that this coupling between disc and halo results from the large-scale gravitational interaction between the two components. Attempts to determine the shape of dark halos have not yet produced convincing results. (author)

  15. 30 CFR 778.9 - Certifying and updating existing permit application information.

    Science.gov (United States)

    2010-07-01

    ... you have previously applied for a permit and the required information is already in AVS, then you may... information already in AVS is accurate and complete may certify to us by swearing or affirming, under oath and in writing, that the relevant information in AVS is accurate, complete, and up to date. (2) Part of...

  16. The run permit protection system for GTA

    International Nuclear Information System (INIS)

    Atkins, W.H.; Jones, R.G.

    1992-01-01

    A Run Permit system has been designed for the Ground Test Accelerator (GTA). The system implements mode-dependent software interlocks to ensure proper operation of the accelerator, enabling the ion source extractor and RF systems when proper conditions are met. The system is implemented using the GTA control system; thus all information available to the control system is also available for use in interlock logic. The logic is defined in terms of control system channels, which reflect accelerator parameters such as actuator positions, power supply values, temperatures, etc. A mode switch in the control room selects the accelerator operating mode, for example i njector only . The Run Permit software selects interlock logic as appropriate operating mode. This implementation easily accommodates logic changes as requirements evolve. To ensure reliable operation of a software-based system, a special circuit with a watch-dog timer is employed to produce the system's output signals. The software must periodically address the circuit, or the output signals are forced to a disabled state. For additional protection, there are self-test provisions for detecting and reacting to failures of the control system. (Author) 4 figs., ref

  17. 78 FR 41959 - Notice of Permit Modification Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2013-07-12

    ... Areas (ASPA) or involving Antarctic Flora and Fauna. Starting in 2013, all new permits issued for ASPA entry or involving Antarctic Flora and Flora require the permittee to submit an annual report to the... Specially Protected Areas (ASPA) or involving Antarctic Flora and Fauna issued prior to 2013 that require...

  18. Unstable gravitino dark matter and neutrino flux

    International Nuclear Information System (INIS)

    Covi, L.; Grefe, M.; Ibarra, A.; Tran, D.

    2008-09-01

    The gravitino is a promising supersymmetric dark matter candidate which does not require exact R-parity conservation. In fact, even with some small R-parity breaking, gravitinos are sufficiently long-lived to constitute the dark matter of the Universe, while yielding a cosmological scenario consistent with primordial nucleosynthesis and the high reheating temperature required for thermal leptogenesis. In this paper, we compute the neutrino flux from direct gravitino decay and gauge boson fragmentation in a simple scenario with bilinear R-parity breaking. Our choice of parameters is motivated by a proposed interpretation of anomalies in the extragalactic gamma-ray spectrum and the positron fraction in terms of gravitino dark matter decay. We find that the generated neutrino flux is compatible with present measurements. We also discuss the possibility of detecting these neutrinos in present and future experiments and conclude that it is a challenging task. However, if detected, this distinctive signal might bring significant support to the scenario of gravitinos as decaying dark matter. (orig.)

  19. Constraining neutron star matter with Quantum Chromodynamics

    CERN Document Server

    Kurkela, Aleksi; Schaffner-Bielich, Jurgen; Vuorinen, Aleksi

    2014-01-01

    In recent years, there have been several successful attempts to constrain the equation of state of neutron star matter using input from low-energy nuclear physics and observational data. We demonstrate that significant further restrictions can be placed by additionally requiring the pressure to approach that of deconfined quark matter at high densities. Remarkably, the new constraints turn out to be highly insensitive to the amount --- or even presence --- of quark matter inside the stars.

  20. 77 FR 25082 - Picture Permit Imprint Indicia

    Science.gov (United States)

    2012-04-27

    ... POSTAL SERVICE 39 CFR Part 111 Picture Permit Imprint Indicia AGENCY: Postal Service\\TM\\. ACTION... Service, Domestic Mail Manual (DMM[supreg]) 604.5 to add picture permit imprint indicia standards allowing...: The use of picture permit imprint indicia is designed to improve the effectiveness of a mailpiece by...

  1. Emissions Inventory Report Summary: Reporting Requirements for the New Mexico Administrative Code, Title 20, Chapter 2, Part 73 (20 NMAC 2.73) for Calendar Year 2001

    International Nuclear Information System (INIS)

    Margorie Stockton

    2003-01-01

    Los Alamos National Laboratory is subject to annual emissions-reporting requirements for regulated air contaminants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), Notice of Intent and Emissions Inventory Requirements. The applicability of the requirements is based on the Laboratory's potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. For calendar year 2001, the Technical Area 3 steam plant was the primary source of criteria air pollutants from the Laboratory, while research and development activities were the primary source of volatile organic compounds. Emissions of beryllium and aluminum were reported for activities permitted under 20.2.72 NMAC. Hazardous air pollutant emissions from chemical use for research and development activities were also reported

  2. 76 FR 45792 - Proposed Reissuance of a General NPDES Permit for Facilities Related to Oil and Gas Extraction

    Science.gov (United States)

    2011-08-01

    ... proposed rule'' for which the agency ``is required by section 553 of the Administrative Procedure Act (APA... permits, not rulemakings, under the APA and thus not subject to APA rulemaking requirements or the RFA...

  3. White matter disease of the brain

    International Nuclear Information System (INIS)

    Melville, G.E.; Fernandez, R.E.; Kishore, P.R.S.; Lee, S.H.

    1987-01-01

    The white matter disorders that are discussed in this chapter are subdivided into those disorders within which there is breakdown of normal myelin, termed myelinoclastic, and those diseases involving either formation or maintenance of abnormal myeline, termed dysmyelinating. CT is a well-established technique for studying white matter disease. Magnetic resonance imaging (MRI) is a new noninvasive technique which has shown greater sensitivity to white matter abnormalities. However, because of the rarity of may white matter diseases coupled with limited availability of MR facilities, the MRI experience in evaluating these patients is not extensive yet. Some patients may not be suitable for MRI because of the longer period of patient immobility that is required to avoid motion artifacts

  4. Astronomical Signatures of Dark Matter

    Directory of Open Access Journals (Sweden)

    Paul Gorenstein

    2014-01-01

    Full Text Available Several independent astronomical observations in different wavelength bands reveal the existence of much larger quantities of matter than what we would deduce from assuming a solar mass to light ratio. They are very high velocities of individual galaxies within clusters of galaxies, higher than expected rotation rates of stars in the outer regions of galaxies, 21 cm line studies indicative of increasing mass to light ratios with radius in the halos of spiral galaxies, hot gaseous X-ray emitting halos around many elliptical galaxies, and clusters of galaxies requiring a much larger component of unseen mass for the hot gas to be bound. The level of gravitational attraction needed for the spatial distribution of galaxies to evolve from the small perturbations implied by the very slightly anisotropic cosmic microwave background radiation to its current web-like configuration requires much more mass than is observed across the entire electromagnetic spectrum. Distorted shapes of galaxies and other features created by gravitational lensing in the images of many astronomical objects require an amount of dark matter consistent with other estimates. The unambiguous detection of dark matter and more recently evidence for dark energy has positioned astronomy at the frontier of fundamental physics as it was in the 17th century.

  5. From requirements to Java in a snap model-driven requirements engineering in practice

    CERN Document Server

    Smialek, Michal

    2015-01-01

    This book provides a coherent methodology for Model-Driven Requirements Engineering which stresses the systematic treatment of requirements within the realm of modelling and model transformations. The underlying basic assumption is that detailed requirements models are used as first-class artefacts playing a direct role in constructing software. To this end, the book presents the Requirements Specification Language (RSL) that allows precision and formality, which eventually permits automation of the process of turning requirements into a working system by applying model transformations and co

  6. 50 CFR 21.21 - Import and export permits.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Import and export permits. 21.21 Section... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Specific Permit Provisions § 21.21 Import and export... must have a permit to import or export migratory birds, their parts, nests, or eggs. You must meet the...

  7. Tensor Fermi liquid parameters in nuclear matter from chiral effective field theory

    Science.gov (United States)

    Holt, J. W.; Kaiser, N.; Whitehead, T. R.

    2018-05-01

    We compute from chiral two- and three-body forces the complete quasiparticle interaction in symmetric nuclear matter up to twice nuclear matter saturation density. Second-order perturbative contributions that account for Pauli blocking and medium polarization are included, allowing for an exploration of the full set of central and noncentral operator structures permitted by symmetries and the long-wavelength limit. At the Hartree-Fock level, the next-to-next-to-leading order three-nucleon force contributes to all noncentral interactions, and their strengths grow approximately linearly with the nucleon density up to that of saturated nuclear matter. Three-body forces are shown to enhance the already strong proton-neutron effective tensor interaction, while the corresponding like-particle tensor force remains small. We also find a large isovector cross-vector interaction but small center-of-mass tensor interactions in the isoscalar and isovector channels. The convergence of the expansion of the noncentral quasiparticle interaction in Landau parameters and Legendre polynomials is studied in detail.

  8. 9 CFR 93.424 - Import permits and applications for inspection of ruminants.

    Science.gov (United States)

    2010-01-01

    ... PRODUCTS IMPORTATION OF CERTAIN ANIMALS, BIRDS, FISH, AND POULTRY, AND CERTAIN ANIMAL, BIRD, AND POULTRY PRODUCTS; REQUIREMENTS FOR MEANS OF CONVEYANCE AND SHIPPING CONTAINERS Ruminants Mexico 10 § 93.424 Import... Mexico, the importer shall first apply for and obtain from APHIS an import permit as provided in § 93.404...

  9. 40 CFR 123.30 - Judicial review of approval or denial of permits.

    Science.gov (United States)

    2010-07-01

    ... permitting process. A State will meet this standard if State law allows an opportunity for judicial review... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Judicial review of approval or denial... (CONTINUED) WATER PROGRAMS STATE PROGRAM REQUIREMENTS State Program Submissions § 123.30 Judicial review of...

  10. Permitting plan for project W-320 tank 241-C-106 waste retrieval sluicing system (WRSS)

    International Nuclear Information System (INIS)

    Symons, G.A.

    1997-01-01

    This document describes the permitting plan for Project W-320, Tank 241-C-106 Waste Retrieval Sluicing System (WRSS). A comprehensive review of environmental regulations have indicated that several environmental reviews [e.g. National Environmental Policy Act (NEPA), State Environmental Policy Act (SEPA)], permits, and approvals are required prior to construction or operation of the facility. The environmental reviews, permits and approvals, as well the regulatory authority, potentially applicable to the Tank 241-C-106 WRSS include the following: for NEPA - U.S. Department of Energy-Headquarters: Action Description Memorandum, Environmental Assessment, Categorical Exclusion, and Environmental Impact Statement; and for SEPA - State of Washington Department of Ecology (Ecology) Determination of Nonsignificance, Mitigated Determination of Nonsignificance, Determination of Significance, and SEPA Environmental Checklist

  11. 77 FR 71818 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-12-04

    ... following permit requests. Applicant Permit No. TE-78622A Applicant: William J. Mautz, Hilo, Hawaii The...-179036 Applicant: Cullen A. Wilkerson, Richmond, California The applicant requests a permit renewal to...

  12. Dark matter from unification

    DEFF Research Database (Denmark)

    Kainulainen, Kimmo; Tuominen, Kimmo; Virkajärvi, Jussi Tuomas

    2013-01-01

    We consider a minimal extension of the Standard Model (SM), which leads to unification of the SM coupling constants, breaks electroweak symmetry dynamically by a new strongly coupled sector and leads to novel dark matter candidates. In this model, the coupling constant unification requires...... eigenstates of this sector and determine the resulting relic density. The results are constrained by available data from colliders and direct and indirect dark matter experiments. We find the model viable and outline briefly future research directions....... the existence of electroweak triplet and doublet fermions singlet under QCD and new strong dynamics underlying the Higgs sector. Among these new matter fields and a new right handed neutrino, we consider the mass and mixing patterns of the neutral states. We argue for a symmetry stabilizing the lightest mass...

  13. Gravitationally bound BCS state as dark matter

    Energy Technology Data Exchange (ETDEWEB)

    Alexander, Stephon [Department of Physics, Brown University, Providence, RI 20912 (United States); Cormack, Sam, E-mail: stephon_alexander@brown.edu, E-mail: samuel.c.cormack.gr@dartmouth.edu [Department of Physics and Astronomy, Dartmouth College, Hanover, NH 03755 (United States)

    2017-04-01

    We explore the possibility that fermionic dark matter undergoes a BCS transition to form a superfluid. This requires an attractive interaction between fermions and we describe a possible source of this interaction induced by torsion. We describe the gravitating fermion system with the Bogoliubov-de Gennes formalism in the local density approximation. We solve the Poisson equation along with the equations for the density and gap energy of the fermions to find a self-gravitating, superfluid solution for dark matter halos. In order to produce halos the size of dwarf galaxies, we require a particle mass of ∼ 200 eV. We find a maximum attractive coupling strength before the halo becomes unstable. If dark matter halos do have a superfluid component, this raises the possibility that they contain vortex lines.

  14. Floodplain District Permit

    Data.gov (United States)

    Montgomery County of Maryland — The purpose of a Floodplain District Permit (FPDP) is to control floodplain development in order to protect persons and property from danger and destruction and to...

  15. IFQ Halibut/Sablefish and CDQ Halibut Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Under the IFQ Halibut/Sablefish Permit Program and CDQ Halibut Permit Program permits are issued for harvesting and receiving/processing halibut, and non-trawl...

  16. 5 CFR 734.202 - Permitted activities.

    Science.gov (United States)

    2010-01-01

    ... (CONTINUED) POLITICAL ACTIVITIES OF FEDERAL EMPLOYEES Permitted Activities § 734.202 Permitted activities. Employees may take an active part in political activities, including political management and political campaigns, to the extent not expressly prohibited by law and this part. ...

  17. BCDC Minor Permits

    Data.gov (United States)

    California Natural Resource Agency — An administrative permit can be issued for an activity that qualifies as a minor repair or improvement in a relatively short period of time and without a public...

  18. 40 CFR 267.147 - Liability requirements.

    Science.gov (United States)

    2010-07-01

    ... consideration of the guarantee. If the guarantor is a firm with a “substantial business relationship” with the... PERMIT Financial Requirements § 267.147 Liability requirements. (a) Coverage for sudden accidental... facilities, must demonstrate financial responsibility for bodily injury and property damage to third parties...

  19. Thermalizing Sterile Neutrino Dark Matter.

    Science.gov (United States)

    Hansen, Rasmus S L; Vogl, Stefan

    2017-12-22

    Sterile neutrinos produced through oscillations are a well motivated dark matter candidate, but recent constraints from observations have ruled out most of the parameter space. We analyze the impact of new interactions on the evolution of keV sterile neutrino dark matter in the early Universe. Based on general considerations we find a mechanism which thermalizes the sterile neutrinos after an initial production by oscillations. The thermalization of sterile neutrinos is accompanied by dark entropy production which increases the yield of dark matter and leads to a lower characteristic momentum. This resolves the growing tensions with structure formation and x-ray observations and even revives simple nonresonant production as a viable way to produce sterile neutrino dark matter. We investigate the parameters required for the realization of the thermalization mechanism in a representative model and find that a simple estimate based on energy and entropy conservation describes the mechanism well.

  20. Thermalizing Sterile Neutrino Dark Matter

    Science.gov (United States)

    Hansen, Rasmus S. L.; Vogl, Stefan

    2017-12-01

    Sterile neutrinos produced through oscillations are a well motivated dark matter candidate, but recent constraints from observations have ruled out most of the parameter space. We analyze the impact of new interactions on the evolution of keV sterile neutrino dark matter in the early Universe. Based on general considerations we find a mechanism which thermalizes the sterile neutrinos after an initial production by oscillations. The thermalization of sterile neutrinos is accompanied by dark entropy production which increases the yield of dark matter and leads to a lower characteristic momentum. This resolves the growing tensions with structure formation and x-ray observations and even revives simple nonresonant production as a viable way to produce sterile neutrino dark matter. We investigate the parameters required for the realization of the thermalization mechanism in a representative model and find that a simple estimate based on energy and entropy conservation describes the mechanism well.

  1. Hawaii Integrated Energy Assessment. Volume V. Rules, regulations, permits and policies affecting the development of alternate energy sources in Hawaii

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    A comprehensive presentaton of the major permits, regulations, rules, and controls which are likely to affect the development of alternate energy sources in Hawaii is presented. An overview of the permit process, showing the major categories and types of permits and controls for energy alternatives is presented. This is followed by a brief resume of current and projected changes designed to streamline the permit process. The permits, laws, regulations, and controls that are applicable to the development of energy alternatives in Hawaii are described. The alternate energy technologies affected, a description of the permit or control, and the requirements for conformance are presented for each applicable permit. Federal, state, and county permits and controls are covered. The individual energy technologies being considered as alternatives to the State's present dependence on imported fossil fuels are emphasized. The alternate energy sources covered are bioconversion, geothermal, ocean thermal, wind, solar (direct), and solid waste. For each energy alternative, the significant permits are summarized with a brief explanation of why they may be necessary. The framework of policy development at each of the levels of government with respect to the alternate energy sources is covered.

  2. Setting the global thermostat with an exhaustible tradeable permit system

    International Nuclear Information System (INIS)

    Kosobud, R.G.; Quinn, K.G.; Illinois Univ., Chicago, IL; South, D.W.; Daly, T.A.

    1993-01-01

    The global warming policy debate has centered largely on near-term objectives such as freezing 1990 CO 2 emissions without regard to long-run implications. A policy of freezing CO 2 emissions is shown to slow but not halt global warming, while requiring expensive near-term adjustments. If the long-run temperature change outcome of the freeze policy is set as the goal of a more graduated control policy, one which allows the market to determine annual emissions, a more cost-effective solution is obtained that reduces the negative adjustment effects on the energy and other affected industries. The most cost-effective emissions time path of a graduated control policy could be achieved by an evaporative marketable CO 2 emissions permit system. This paper provides a preliminary examination of an evaporative permit system used to achieve long-run stabilization of greenhouse-induced temperature change

  3. The Use of Transferable Permits in Transport Policy

    OpenAIRE

    Raux, Charles

    2004-01-01

    http://dx.doi.org/10.1016/j.trd.2004.01.001; International audience; This paper considers potential use of domestic transferable, or tradable, permit systems for the purposes of travel management, especially reducing environmental nuisances. The main arguments for and against the use of permits are analyzed. Secondly two case studies of existing permit systems are examined. The main conclusions are that tradable permits can address greenhouse gas and regional atmospheric pollutant emissions, ...

  4. Galactic optical cloaking of visible baryonic matter

    Science.gov (United States)

    Smolyaninov, Igor I.

    2018-05-01

    Three-dimensional gravitational cloaking is known to require exotic matter and energy sources, which makes it arguably physically unrealizable. On the other hand, typical astronomical observations are performed using one-dimensional paraxial line of sight geometries. We demonstrate that unidirectional line of sight gravitational cloaking does not require exotic matter, and it may occur in multiple natural astronomical scenarios that involve gravitational lensing. In particular, recently discovered double gravitational lens SDSSJ 0 9 4 6 +1 0 0 6 together with the Milky Way appear to form a natural paraxial cloak. A natural question to ask, then, is how much matter in the Universe may be hidden from view by such natural gravitational cloaks? It is estimated that the total volume hidden from an observer by gravitational cloaking may reach about 1% of the total volume of the visible Universe.

  5. 50 CFR 21.31 - Rehabilitation permits.

    Science.gov (United States)

    2010-10-01

    ..., foster parenting, research projects, or other permitted activities with persons permitted or otherwise... Response Coordinator or other designated Service representative and obtain permission from the On-Scene Coordinator. All activities within the location of the spill are subject to the authority of the On-Scene...

  6. The dark side of matter

    International Nuclear Information System (INIS)

    Cline, D.

    2003-01-01

    The number of baryons (protons and neutrons) of the universe can be deduced from the relative abundances of light elements (deuterium, helium and lithium) that were generated during the very first minutes of the cosmic history. This calculation has shown that the baryonic matter represents only 5% of the total mass of the universe. As for neutrinos (hot dark matter), their very low mass restraints their contribution to only 0,3%. The spinning movement of galaxies requires the existence of huge quantity of matter that seems invisible (black matter). Astrophysicists have recently discovered that the universal expansion is accelerating and that the space geometry is euclidean, from these 2 facts they have deduced a value of the mass-energy density that implies the existence of something different from dark matter called dark energy and that is expected to represent about 70% of the mass of the universe. Physicists face the challenge of detecting black matter and black energy. The first attempt for detecting black matter began in 1997 when the UKDMC detector entered into service. Now more than half a dozen of detectors are searching for dark matter but till now in vain. A new generation of detectors (CDMS-2, ZEPLIN-2, CRESST-2 and Edelweiss-2) combining detection, new methods of particle discrimination and the study of the evolution of the signal over very long periods of time are progressively entering into operation. (A.C.)

  7. 78 FR 24305 - Actions on Special Permit Applications

    Science.gov (United States)

    2013-04-24

    ... special permit Lincoln, NE. to authorize an alternative fire protection system. 11624-M Clean Harbors 49... Special Permit Applications AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice of actions on Special Permit Applications. SUMMARY: In accordance with the procedures...

  8. 40 CFR 233.21 - General permits.

    Science.gov (United States)

    2010-07-01

    ... ensure compliance with existing permit conditions an any reporting monitoring, or prenotification... apply for an individual permit. This discretionary authority will be based on concerns for the aquatic environment including compliance with paragraph (b) of this section and the 404(b)(1) Guidelines (40 CFR part...

  9. 40 CFR 144.51 - Conditions applicable to all permits.

    Science.gov (United States)

    2010-07-01

    ... PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Permit Conditions § 144.51 Conditions applicable... permit. Any permit noncompliance constitutes a violation of the Safe Drinking Water Act and is grounds... denial of a permit renewal application; except that the permittee need not comply with the provisions of...

  10. Matter-antimatter and matter-matter interactions at intermediate energies

    International Nuclear Information System (INIS)

    Santos, Antonio Carlos Fontes dos

    2002-01-01

    This article presents some of the recent experimental advances on the study on antimatter-matter and matter-matter interactions, and some of the subtle differences stimulated a great theoretical efforts for explanation of the results experimentally observed

  11. 78 FR 6817 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2013-01-31

    ... Wisconsin Public Service Corporation--JP Pulliam Plant. Pursuant to section 505(b)(2) of the Act, a... ENVIRONMENTAL PROTECTION AGENCY [FRL 9774-6] Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for Wisconsin Public Service Corporation--JP Pulliam Plant AGENCY...

  12. Inelastic Boosted Dark Matter at direct detection experiments

    Science.gov (United States)

    Giudice, Gian F.; Kim, Doojin; Park, Jong-Chul; Shin, Seodong

    2018-05-01

    We explore a novel class of multi-particle dark sectors, called Inelastic Boosted Dark Matter (iBDM). These models are constructed by combining properties of particles that scatter off matter by making transitions to heavier states (Inelastic Dark Matter) with properties of particles that are produced with a large Lorentz boost in annihilation processes in the galactic halo (Boosted Dark Matter). This combination leads to new signals that can be observed at ordinary direct detection experiments, but require unconventional searches for energetic recoil electrons in coincidence with displaced multi-track events. Related experimental strategies can also be used to probe MeV-range boosted dark matter via their interactions with electrons inside the target material.

  13. 50 CFR 648.88 - Multispecies open access permit restrictions.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 8 2010-10-01 2010-10-01 false Multispecies open access permit... Management Measures for the NE Multispecies and Monkfish Fisheries § 648.88 Multispecies open access permit restrictions. (a) Handgear permit. A vessel issued a valid open access NE multispecies Handgear permit is...

  14. Plasma dark matter direct detection

    Energy Technology Data Exchange (ETDEWEB)

    Clarke, J.D.; Foot, R., E-mail: j.clarke5@pgrad.unimelb.edu.au, E-mail: rfoot@unimelb.edu.au [ARC Centre of Excellence for Particle Physics at the Terascale, School of Physics, University of Melbourne, Victoria 3010 Australia (Australia)

    2016-01-01

    Dark matter in spiral galaxies like the Milky Way may take the form of a dark plasma. Hidden sector dark matter charged under an unbroken U(1)' gauge interaction provides a simple and well defined particle physics model realising this possibility. The assumed U(1)' neutrality of the Universe then implies (at least) two oppositely charged dark matter components with self-interactions mediated via a massless 'dark photon' (the U(1)' gauge boson). In addition to nuclear recoils such dark matter can give rise to keV electron recoils in direct detection experiments. In this context, the detailed physical properties of the dark matter plasma interacting with the Earth is required. This is a complex system, which is here modelled as a fluid governed by the magnetohydrodynamic equations. These equations are numerically solved for some illustrative examples, and implications for direct detection experiments discussed. In particular, the analysis presented here leaves open the intriguing possibility that the DAMA annual modulation signal is due primarily to electron recoils (or even a combination of electron recoils and nuclear recoils). The importance of diurnal modulation (in addition to annual modulation) as a means of probing this kind of dark matter is also emphasised.

  15. 9 CFR 95.12 - Bones, horns, and hoofs; importations permitted subject to restrictions.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Bones, horns, and hoofs; importations... ENTRY INTO THE UNITED STATES § 95.12 Bones, horns, and hoofs; importations permitted subject to restrictions. Bones, horns, and hoofs offered for importation which do not meet the conditions or requirements...

  16. Permit processes for nuclear power. International lessons

    International Nuclear Information System (INIS)

    Gaahlin, Emil; Nilsson, Isabelle; Pettersson, Maria; Soederholm, Patrik

    2010-01-01

    The overall objective of this report is to analyze and compare the legal permitting and planning process for (first and foremost) new nuclear power stations in a number of selected countries. In this way the report provides relevant knowledge that could form the basis for discussing the efficiency of various national licensing processes (include the Swedish one). The study builds heavily on the analysis of legal documents and regulations, and addresses both the formal requirements for licensing and territorial planning procedures as well as the issues of public participation and access to justice in the respective countries. In addition to this legal approach, however, we also adopt an investor's perspective on the legislation, i.e., an analysis of the legal rules can influence investment decisions in practice. Furthermore, the study relies largely on a synthesis of previous studies as well as interviews with researchers, electricity companies and government officials in Sweden and abroad. The countries that are compared include Sweden, Finland, France, Canada, Switzerland, Great Britain, USA and South Korea. These include those that currently invest in new nuclear power as well as those who have recently reformed their plant permitting processes. The analysis highlights important differences among the various countries, including issues such as the political influence on the licensing process, the allocation of political power between the national and local levels, means of interacting with regular citizens, and the overall transparency and predictability of the legislation. Some selected practical experiences of the current legislation are also presented. The report first provides a short background to the role and the status of nuclear power in the global energy system, and we then present a rather comprehensive comparison of the permitting processes in the above countries. Each country section comprises a short background, a presentation of the existing

  17. 25 CFR 211.56 - Geological and geophysical permits.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Geological and geophysical permits. 211.56 Section 211.56... FOR MINERAL DEVELOPMENT Rents, Royalties, Cancellations and Appeals § 211.56 Geological and geophysical permits. Permits to conduct geological and geophysical operations on Indian lands which do not...

  18. 77 FR 34061 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2012-06-08

    ...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...

  19. 78 FR 27255 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2013-05-09

    ...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...

  20. 78 FR 56922 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2013-09-16

    ...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...

  1. Marketable pollution permits with uncertainty and transaction costs

    International Nuclear Information System (INIS)

    Montero, Juan-Pablo

    1998-01-01

    Increasing interest in the use of marketable permits for pollution control has become evident in recent years. Concern regarding their performance still remains because empirical evidence has shown transaction costs and uncertainty to be significant in past and existing marketable permits programs. In this paper we develop theoretical and numerical models that include transaction costs and uncertainty (in trade approval) to show their effects on market performance (i.e., equilibrium price of permits and trading volume) and aggregate control costs. We also show that in the presence of transaction costs and uncertainty the initial allocation of permits may not be neutral in terms of efficiency. Furthermore, using a numerical model for a hypothetical NO x trading program in which participants have discrete control technology choices, we find that aggregate control costs and the equilibrium price of permits are sensitive to the initial allocation of permits, even for constant marginal transaction costs and certainty

  2. 34 CFR 395.35 - Terms of permit.

    Science.gov (United States)

    2010-07-01

    ..., periodicals, publications, confections, tobacco products, foods, beverages, chances for any lottery authorized... PROPERTY Federal Property Management § 395.35 Terms of permit. Every permit shall describe the location of...

  3. 7 CFR 330.208 - Courtesy permits.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Courtesy permits. 330.208 Section 330.208 Agriculture... PRODUCTS; GARBAGE Movement of Plant Pests § 330.208 Courtesy permits. The Deputy Administrator may issue... subject to regulation under the Plant Protection Actor any other act, as a courtesy to facilitate movement...

  4. 75 FR 2560 - Issuance of Permits

    Science.gov (United States)

    2010-01-15

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R9-IA-2010-N006] [96300-1671-0000-P5] Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of issuance of permits..., 2009 PH.D, Department of 16, 2009. Cardiology Children's Hospital. Dated: January 8, 2010. Brenda Tapia...

  5. Materials and Fuels Complex Hazardous Waste Management Act/Resource Conservation and Recovery Act Storage and Treatment Permit Reapplication, Environmental Protection Agency Number ID4890008952

    Energy Technology Data Exchange (ETDEWEB)

    Holzemer, Michael J. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hart, Edward [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-04-01

    Hazardous Waste Management Act/Resource Conservation and Recovery Act Storage and Treatment Permit Reapplication for the Idaho National Laboratory Materials and Fuels Complex Hazardous Waste Management Act/Resource Conservation and Recovery Act Partial Permit, PER-116. This Permit Reapplication is required by the PER-116 Permit Conditions I.G. and I.H., and must be submitted to the Idaho Department of Environmental Quality in accordance with IDAPA 58.01.05.012 [40 CFR §§ 270.10 and 270.13 through 270.29].

  6. 25 CFR 212.56 - Geological and geophysical permits.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Geological and geophysical permits. 212.56 Section 212.56... FOR MINERAL DEVELOPMENT Rents, Royalties, Cancellations, and Appeals § 212.56 Geological and geophysical permits. (a) Permits to conduct geological and geophysical operations on Indian lands which do not...

  7. Hanford Site Solid Waste Landfill permit application

    International Nuclear Information System (INIS)

    1991-01-01

    Daily activities at the Hanford Site generate sanitary solid waste (nonhazardous and nonradioactive) that is transported to and permanently disposed of at the Hanford Site Solid Waste Landfill. This permit application describes the manner in which the solid Waste Landfill will be operated under Washington State Department of Ecology Minimum Functional Standards for Solid Waste Handling, Washington Administrative Code 173-304. The solid Waste Landfill is owned by the US Department of Energy -- Richland Operations Office and is used for disposal of solid waste generated at the US Department of Energy Hanford Site. The jurisdictional health department's permit application form for the Solid Waste Landfill is provided in Chapter 1.0. Chapter 2.0 provides a description of the Hanford Site and the Solid Waste Landfill and reviews applicable locational, general facility, and landfilling standards. Chapter 3.0 discusses the characteristics and quantity of the waste disposed of in the Solid Waste Landfill. Chapter 4.0 reviews the regional and site geology and hydrology and the groundwater and vadose zone quality beneath the landfill. Chapters 5.0, 6.0, and 7.0 contain the plan of operation, closure plan, and postclosure plan, respectively. The plan of operation describes the routine operation and maintenance of the Solid Waste Landfill, the environmental monitoring program, and the safety and emergency plans. Chapter 5.0 also addresses the operational cover, environmental controls, personnel requirements, inspections, recordkeeping, reporting, and site security. The postclosure plan describes requirements for final cover maintenance and environmental monitoring equipment following final closure. Chapter 8.0 discusses the integration of closure and postclosure activities between the Solid Waste Landfill and adjacent Nonradioactive Dangerous Waste Landfill. 76 refs., 48 figs, 15 tabs

  8. Superheavy thermal dark matter and primordial asymmetries

    International Nuclear Information System (INIS)

    Bramante, Joseph; Unwin, James

    2017-01-01

    The early universe could feature multiple reheating events, leading to jumps in the visible sector entropy density that dilute both particle asymmetries and the number density of frozen-out states. In fact, late time entropy jumps are usually required in models of Affleck-Dine baryogenesis, which typically produces an initial particle-antiparticle asymmetry that is much too large. An important consequence of late time dilution, is that a smaller dark matter annihilation cross section is needed to obtain the observed dark matter relic density. For cosmologies with high scale baryogenesis, followed by radiation-dominated dark matter freeze-out, we show that the perturbative unitarity mass bound on thermal relic dark matter is relaxed to 10 10 GeV. We proceed to study superheavy asymmetric dark matter models, made possible by a sizable entropy injection after dark matter freeze-out, and identify how the Affleck-Dine mechanism would generate the baryon and dark asymmetries.

  9. Superheavy thermal dark matter and primordial asymmetries

    Energy Technology Data Exchange (ETDEWEB)

    Bramante, Joseph [Perimeter Institute for Theoretical Physics,31 Caroline St N, Waterloo, ON N2L 2Y5 (Canada); Unwin, James [Department of Physics, University of Illinois at Chicago,845 W Taylor St, Chicago, IL 60607 (United States)

    2017-02-23

    The early universe could feature multiple reheating events, leading to jumps in the visible sector entropy density that dilute both particle asymmetries and the number density of frozen-out states. In fact, late time entropy jumps are usually required in models of Affleck-Dine baryogenesis, which typically produces an initial particle-antiparticle asymmetry that is much too large. An important consequence of late time dilution, is that a smaller dark matter annihilation cross section is needed to obtain the observed dark matter relic density. For cosmologies with high scale baryogenesis, followed by radiation-dominated dark matter freeze-out, we show that the perturbative unitarity mass bound on thermal relic dark matter is relaxed to 10{sup 10} GeV. We proceed to study superheavy asymmetric dark matter models, made possible by a sizable entropy injection after dark matter freeze-out, and identify how the Affleck-Dine mechanism would generate the baryon and dark asymmetries.

  10. Banking and back-loading emission permits

    International Nuclear Information System (INIS)

    Chaton, Corinne; Creti, Anna; Peluchon, Benoît

    2015-01-01

    In this article we focus on the so-called back-loading policy adopted by the European Commission to increase the carbon market price. This environmental measure consists of removing a share of the allowances allocated for a given period in order to reallocate some or all of them later on. To analyze the impact of the permits back-loading, we determine the CO 2 price equilibrium with and without the policy measure, considering not only the market for permits but also the output market of regulated sectors. We propose a two-period model, where the market for permits is perfectly competitive, and the output market can be either competitive or oligopolistic. First, we define the condition under which banking from one period to another is optimal. This condition, that is the absence of arbitrage opportunities (AOA), depends not only from the period initial allocation but also on production market fundamentals. When this condition is satisfied, the market for emission is shown intertemporally efficient. Second, we point out that the back-loading measure may create inefficiencies or leave unaffected the permits price, if it alters the AOA. -- Highlights: •Relationship between the market for permits and the output market of regulated sectors. •Analysis of CO 2 prices and banking. •Impact of a recent environmental policy measure (backloading) on CO 2 prices

  11. 77 FR 47380 - Final National Pollutant Discharge Elimination System (NPDES) General Permit for Discharges From...

    Science.gov (United States)

    2012-08-08

    ... test fluids, sanitary waste, domestic waste and miscellaneous discharges is authorized. More stringent... permit. Major changes also include definition of ``operator'', acute toxicity test for produced water, spill prevention best management practices, and electronic reporting requirements. To obtain discharge...

  12. 32 CFR 552.90 - Permit office.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 3 2010-07-01 2010-07-01 true Permit office. 552.90 Section 552.90 National... CEMETERIES REGULATIONS AFFECTING MILITARY RESERVATIONS Fort Lewis Land Use Policy § 552.90 Permit office... non-training acess to the range complex. The office is open 0700-1900 hours, seven days a week, for...

  13. 75 FR 20622 - Endangered Wildlife and Plants; Permits

    Science.gov (United States)

    2010-04-20

    .... Permit No. TE-02997A Applicant: University of Hawaii, Hilo, Hawaii. The applicant requests a permit to... scientific research including genetic, morphological and behavioral research on the island of Hawaii in the State of Hawaii for the purpose of enhancing its survival. The applicant also requests a permit to take...

  14. 76 FR 67650 - Migratory Bird Permits; Abatement Regulations

    Science.gov (United States)

    2011-11-02

    ... and suggestions on migratory bird permit regulations for a permit to use raptors (birds of prey) in abatement activities. Abatement means the use of trained raptors to flush, scare (haze), or take birds or... for a specific permit authorizing the use of raptors in abatement activities (76 FR 39368). The...

  15. 21 CFR 1312.22 - Application for export permit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Application for export permit. 1312.22 Section... EXPORTATION OF CONTROLLED SUBSTANCES Exportation of Controlled Substances § 1312.22 Application for export permit. (a) An application for a permit to export controlled substances shall be made on DEA Form 161...

  16. 40 CFR 60.4123 - Hg budget permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Hg budget permit contents and term. 60... Coal-Fired Electric Steam Generating Units Permits § 60.4123 Hg budget permit contents and term. (a) Each Hg Budget permit will contain, in a format prescribed by the permitting authority, all elements...

  17. 10 CFR 73.57 - Requirements for criminal history records checks of individuals granted unescorted access to a...

    Science.gov (United States)

    2010-01-01

    ..., certification, permitting, or approval of a product subject to regulation by the Commission shall submit... may be obtained by writing the Office of Information Services, U.S. Nuclear Regulatory Commission... explain any matter in the record, the individual may initiate challenge procedures. These procedures...

  18. 77 FR 37961 - Hazardous Materials: Incorporating Rail Special Permits Into the Hazardous Materials Regulations

    Science.gov (United States)

    2012-06-25

    ...'' are added to Sec. 171.8. Requirements for electronic shipping papers, electronic data interchange (EDI... electronic shipping paper information transmitted by EDI for the development of shipping papers used to... shipping papers by carriers. Most of the commenters support amending the HMR to permit EDI transmission of...

  19. Hanford analytical services quality assurance requirements documents. Volume 1: Administrative Requirements

    International Nuclear Information System (INIS)

    Hyatt, J.E.

    1997-01-01

    Hanford Analytical Services Quality Assurance Requirements Document (HASQARD) is issued by the Analytical Services, Program of the Waste Management Division, US Department of Energy (US DOE), Richland Operations Office (DOE-RL). The HASQARD establishes quality requirements in response to DOE Order 5700.6C (DOE 1991b). The HASQARD is designed to meet the needs of DOE-RL for maintaining a consistent level of quality for sampling and field and laboratory analytical services provided by contractor and commercial field and laboratory analytical operations. The HASQARD serves as the quality basis for all sampling and field/laboratory analytical services provided to DOE-RL through the Analytical Services Program of the Waste Management Division in support of Hanford Site environmental cleanup efforts. This includes work performed by contractor and commercial laboratories and covers radiological and nonradiological analyses. The HASQARD applies to field sampling, field analysis, and research and development activities that support work conducted under the Hanford Federal Facility Agreement and Consent Order Tri-Party Agreement and regulatory permit applications and applicable permit requirements described in subsections of this volume. The HASQARD applies to work done to support process chemistry analysis (e.g., ongoing site waste treatment and characterization operations) and research and development projects related to Hanford Site environmental cleanup activities. This ensures a uniform quality umbrella to analytical site activities predicated on the concepts contained in the HASQARD. Using HASQARD will ensure data of known quality and technical defensibility of the methods used to obtain that data. The HASQARD is made up of four volumes: Volume 1, Administrative Requirements; Volume 2, Sampling Technical Requirements; Volume 3, Field Analytical Technical Requirements; and Volume 4, Laboratory Technical Requirements. Volume 1 describes the administrative requirements

  20. 21 CFR 1312.23 - Issuance of export permit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Issuance of export permit. 1312.23 Section 1312.23... CONTROLLED SUBSTANCES Exportation of Controlled Substances § 1312.23 Issuance of export permit. (a) The... regulation in § 1312.30 of this part be exported only pursuant to the issuance of an export permit. The...

  1. 1993 RCRA Part B permit renewal application, Savannah River Site: Volume 10, Consolidated Incineration Facility, Section C, Revision 1

    International Nuclear Information System (INIS)

    Molen, G.

    1993-08-01

    This section describes the chemical and physical nature of the RCRA regulated hazardous wastes to be handled, stored, and incinerated at the Consolidated Incineration Facility (CIF) at the Savannah River Site. It is in accordance with requirements of South Carolina Hazardous Waste Management Regulations R.61-79.264.13(a) and(b), and 270.14(b)(2). This application is for permit to store and teat these hazardous wastes as required for the operation of CIF. The permit is to cover the storage of hazardous waste in containers and of waste in six hazardous waste storage tanks. Treatment processes include incineration, solidification of ash, and neutralization of scrubber blowdown

  2. Organic matter loading affects lodgepole pine seedling growth.

    Science.gov (United States)

    Wei, Xiaohua; Li, Qinglin; Waterhouse, M J; Armleder, H M

    2012-06-01

    Organic matter plays important roles in returning nutrients to the soil, maintaining forest productivity and creating habitats in forest ecosystems. Forest biomass is in increasing demand for energy production, and organic matter has been considered as a potential supply. Thus, an important management question is how much organic matter should be retained after forest harvesting to maintain forest productivity. To address this question, an experimental trial was established in 1996 to evaluate the responses of lodgepole pine seedling growth to organic matter loading treatments. Four organic matter loading treatments were randomly assigned to each of four homogeneous pine sites: removal of all organic matter on the forest floor, organic matter loading quantity similar to whole-tree-harvesting residuals left on site, organic matter loading quantity similar to stem-only-harvesting residuals, and organic matter loading quantity more similar to what would be found in disease- or insect-killed stands. Our 10-year data showed that height and diameter had 29 and 35 % increase, respectively, comparing the treatment with the most organic matter loading to the treatment with the least organic matter loading. The positive response of seedling growth to organic matter loading may be associated with nutrients and/or microclimate change caused by organic matter, and requires further study. The dynamic response of seedling growth to organic matter loading treatments highlights the importance of long-term studies. Implications of those results on organic matter management are discussed in the context of forest productivity sustainability.

  3. THE IMPACT OF SHRINKING HANFORD BOUNDARIES ON PERMITS FOR TOXIC AIR POLLUTANT EMISSIONS FROM THE HANFORD 200 WEST AREA

    International Nuclear Information System (INIS)

    JOHNSON, R.E.

    2005-01-01

    This presentation (CE-580. Graduate Seminar) presents a brief description of an approach to use a simpler dispersion modeling method (SCREEN3) in conjunction with joint frequency tables for Hanford wind conditions to evaluate the impacts of shrinking the Hanford boundaries on the current permits for facilities in the 200 West Area. To fulfill requirements for the graduate student project (CE-702. Master's Special Problems), this evaluation will be completed and published over the next two years. Air toxic emissions play an important role in environmental quality and require a state approved permit. One example relates to containers or waste that are designated as Transuranic Waste (TRU), which are required to have venting devices due to hydrogen generation. The Washington State Department of Ecology (Ecology) determined that the filters used did not meet the definition of a ''pressure relief device'' and that a permit application would have to be submitted by the Central Waste Complex (CWC) for criteria pollutant and toxic air pollutant (TAP) emissions in accordance with Washington Administrative Code (WAC) 173-400 and 173-460. The permit application submitted in 2000 to Ecology used Industrial Source Code III (ISCIII) dispersion modeling to demonstrate that it was not possible for CWC to release a sufficient quantity of fugitive Toxic Air Pollutant emissions that could exceed the Acceptable Source Impact Levels (ASILs) at the Hanford Site Boundary. The modeled emission rates were based on the diurnal breathing in and out through the vented drums (approximately 20% of the drums), using published vapor pressure, molecular weight, and specific gravity data for all 600+ compounds, with a conservative estimate of one exchange volume per day (208 liters per drum). Two permit applications were submitted also to Ecology for the Waste Receiving and Processing Facility and the T Plant Complex. Both permit applications were based on the Central Waste Complex approach, and

  4. Rosebud Casino and Hotel NPDES Proposed Permit

    Science.gov (United States)

    Indian Country, Minor Permit, proposed permit SD-0034584, Rosebud Casino and Hotel, South Dakota, is authorized to discharge from its wastewater treatment facility in Todd County, South Dakota to an unnamed drainageway(s) tributary to Rock Creek.

  5. Regge trajectories and Hagedorn behavior: Hadronic realizations of dynamical dark matter

    Science.gov (United States)

    Dienes, Keith R.; Huang, Fei; Su, Shufang; Thomas, Brooks

    2017-11-01

    Dynamical Dark Matter (DDM) is an alternative framework for dark-matter physics in which the dark sector comprises a vast ensemble of particle species whose Standard-Model decay widths are balanced against their cosmological abundances. In this talk, we study the properties of a hitherto-unexplored class of DDM ensembles in which the ensemble constituents are the "hadronic" resonances associated with the confining phase of a strongly-coupled dark sector. Such ensembles exhibit masses lying along Regge trajectories and Hagedorn-like densities of states that grow exponentially with mass. We investigate the applicable constraints on such dark-"hadronic" DDM ensembles and find that these constraints permit a broad range of mass and confinement scales for these ensembles. We also find that the distribution of the total present-day abundance across the ensemble is highly correlated with the values of these scales. This talk reports on research originally presented in Ref. [1].

  6. Permitting issues in Virginia

    International Nuclear Information System (INIS)

    Kennel, R.P.

    1992-01-01

    As background, LG and E Development Corporation (formerly Hadson) has successfully put 16 Qualifying Facilities in the ground over the past 9 years in California, Maine, Virginia, and North Carolina. Each of these qualifying facilities has had some environmental innovative first, so there is no apology for the authors' environmental credentials. In Virginia, there are four identical 60 MW stoker coal cogeneration projects in Southampton County, Altavista, Hopewell, and -lastly-Buena Vista. The Buena Vista cogeneration project becomes the exception that proves the permitting rules. It has been in the permitting process for over 4 years; and despite being the cleanest coal project ever considered east of the Mississippi (design at 0.1 lbs/MMBtu for both So 2 and NO x ), it has suffered serous consequences from permitting delays and BACT ratcheting. As a simple comparison of importance, the Virginia Power Mt. Storm coal power facility emits approximately 150,000 tons of So 2 per year, while the Buena Vista project will actually emit approximately 150 tons of SO 2 per year (not including 1,500' tons of purchased SO 2 offsets). Both are similar distances from the Shenandoah National Park which has been the primary environmental point of concern in Virginia

  7. Challenges for the kinetic unified dark matter model

    International Nuclear Information System (INIS)

    Giannakis, Dimitrios; Hu, Wayne

    2005-01-01

    Given that the dark matter and dark energy in the Universe affect cosmological observables only gravitationally, their phenomenology may be described by a single stress-energy tensor. True unification however requires a theory that reproduces the successful phenomenology of ΛCDM and that requirement places specific constraints on the stress structure of the matter. We show that a recently proposed unification through an offset quadratic kinetic term for a scalar field is exactly equivalent to a fluid with a closed-form barotropic equation of state plus cosmological constant. The finite pressure at high densities introduces a cutoff in the linear power spectrum, which may alleviate the dark matter substructure problem; we provide a convenient fitting function for such studies. Given that sufficient power must remain to reionize the Universe, the equation of state today is nonrelativistic with p∝ρ 2 and a Jeans scale in the parsec regime for all relevant densities. Structure may then be evolved into the nonlinear regime with standard hydrodynamic techniques. In fact, the model is equivalent to the well-studied collisional dark matter with negligible mean free path. If recent observations of the triaxiality of dark matter halos and ram pressure stripping in galaxy clusters are confirmed, this model will be ruled out

  8. 75 FR 22400 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator...

    Science.gov (United States)

    2010-04-28

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9142-6] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator Baltimore, L.P., Baltimore City, MD AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of final action. SUMMARY: Pursuant to section 505(b)(2) of the Clean...

  9. Bound-state formation for thermal relic dark matter and unitarity

    International Nuclear Information System (INIS)

    Harling, Benedict von; Petraki, Kalliopi

    2014-01-01

    We show that the relic abundance of thermal dark matter annihilating via a long-range interaction, is significantly affected by the formation and decay of dark matter bound states in the early universe, if the dark matter mass is above a few TeV . We determine the coupling required to obtain the observed dark matter density, taking into account both the direct 2-to-2 annihilations and the formation of bound states, and provide an analytical fit. We argue that the unitarity limit on the inelastic cross-section is realized only if dark matter annihilates via a long-range interaction, and we determine the upper bound on the mass of thermal-relic dark matter to be about 197 (139) TeV for (non)-self-conjugate dark matter

  10. Review and revision of overload permit classification.

    Science.gov (United States)

    2013-02-01

    The Michigan Department of Transportation (MDOT) allows trucks that exceed their legal loads to cross : bridges if they apply and are approved for a permit. More than 30,000 permits have been processed each : year since 2002, providing a vital servic...

  11. 300 area TEDF permit compliance monitoring plan

    International Nuclear Information System (INIS)

    BERNESKI, L.D.

    1998-01-01

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease

  12. 300 area TEDF permit compliance monitoring plan

    Energy Technology Data Exchange (ETDEWEB)

    BERNESKI, L.D.

    1998-11-20

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease.

  13. Modified dark matter: Relating dark energy, dark matter and baryonic matter

    Science.gov (United States)

    Edmonds, Douglas; Farrah, Duncan; Minic, Djordje; Ng, Y. Jack; Takeuchi, Tatsu

    Modified dark matter (MDM) is a phenomenological model of dark matter, inspired by gravitational thermodynamics. For an accelerating universe with positive cosmological constant (Λ), such phenomenological considerations lead to the emergence of a critical acceleration parameter related to Λ. Such a critical acceleration is an effective phenomenological manifestation of MDM, and it is found in correlations between dark matter and baryonic matter in galaxy rotation curves. The resulting MDM mass profiles, which are sensitive to Λ, are consistent with observational data at both the galactic and cluster scales. In particular, the same critical acceleration appears both in the galactic and cluster data fits based on MDM. Furthermore, using some robust qualitative arguments, MDM appears to work well on cosmological scales, even though quantitative studies are still lacking. Finally, we comment on certain nonlocal aspects of the quanta of modified dark matter, which may lead to novel nonparticle phenomenology and which may explain why, so far, dark matter detection experiments have failed to detect dark matter particles.

  14. Renewable Energy Permitting Barriers in Hawaii: Experience from the Field

    Energy Technology Data Exchange (ETDEWEB)

    Busche, S.; Donnelly, C.; Atkins, D.; Fields, R.; Black, C.

    2013-03-01

    This white paper presents a summary of the solicited input from permitting agencies and renewable energy developers on the permitting process in Hawaii to provide stakeholders in Hawaii, particularly those involved in permitting, with information on current permitting barriers that renewable energy developers are experiencing.

  15. Decaying dark matter and the PAMELA anomaly

    International Nuclear Information System (INIS)

    Ibarra, Alejandro; Tran, David

    2009-01-01

    Astrophysical and cosmological observations do not require the dark matter particles to be absolutely stable. If they are indeed unstable, their decay into positrons might occur at a sufficiently large rate to allow the indirect detection of dark matter through an anomalous contribution to the cosmic positron flux. In this paper we discuss the implications of the excess in the positron fraction recently reported by the PAMELA collaboration for the scenario of decaying dark matter. To this end, we have performed a model-independent analysis of possible signatures by studying various decay channels in the case of both a fermionic and a scalar dark matter particle. We find that the steep rise in the positron fraction measured by PAMELA at energies larger than 10 GeV can naturally be accommodated in several realizations of the decaying dark matter scenario. The data point toward a rather heavy dark matter particle, m DM ∼> 300 GeV, which preferentially decays directly into first or second generation charged leptons with a lifetime τ DM ∼ 10 26 s

  16. 40 CFR 158.2174 - Experimental use permit microbial pesticides nontarget organisms and environmental fate data...

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Experimental use permit microbial... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS DATA REQUIREMENTS... controls the target insect pest by a mechanism of infectivity; i.e., may create an epizootic condition in...

  17. Comments for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit)

    Science.gov (United States)

    List of comments for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit: Massachusetts Plan Approval including nonattainment NSR Appendix A requirements).

  18. Detectability of Light Dark Matter with Superfluid Helium.

    Science.gov (United States)

    Schutz, Katelin; Zurek, Kathryn M

    2016-09-16

    We show that a two-excitation process in superfluid helium, combined with sensitivity to meV energy depositions, can probe dark matter down to the ∼keV warm dark matter mass limit. This mass reach is 3 orders of magnitude below what can be probed with ordinary nuclear recoils in helium at the same energy resolution. For dark matter lighter than ∼100  keV, the kinematics of the process requires the two athermal excitations to have nearly equal and opposite momentum, potentially providing a built-in coincidence mechanism for controlling backgrounds.

  19. Searching for Quark Matter at the CERN SPS

    CERN Document Server

    Lourenço, C

    2002-01-01

    This article gives a brief overview of some recent advances in our understanding of the physics of dense strongly interacting matter, from measurements done at the CERN SPS. The presently available results are very interesting, and are likely to reflect the production of a new state of matter in central Pb-Pb collisions, at the highest SPS energies. However, important questions require further work. Particular emphasis is given to developments made since the Quark Matter 1999 conference, and to issues that justify the continuation of the SPS heavy ion physics program beyond year 2000.

  20. USDA Forest Service, Rocky Mountain Region PSD Permit Completeness Determination

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  1. 40 CFR 270.65 - Research, development, and demonstration permits.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Research, development, and... Special Forms of Permits § 270.65 Research, development, and demonstration permits. (a) The Administrator may issue a research, development, and demonstration permit for any hazardous waste treatment facility...

  2. 76 FR 53452 - Clean Air Act Operating Permit Program; Response to Petition To Reopen the 2001 Title V Permit...

    Science.gov (United States)

    2011-08-26

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9457-3 ] Clean Air Act Operating Permit Program; Response to Petition To Reopen the 2001 Title V Permit for Reliant Portland Generating Station, Upper Mount Bethel Township, Northampton County, PA AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of action...

  3. 40 CFR 68.85 - Hot work permit.

    Science.gov (United States)

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.85 Hot work permit. (a) The owner or operator shall issue a hot work permit for hot work operations conducted on or near a covered process. (b...

  4. Permitted Marine Hydrokinetic Projects

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data represents pending or issued preliminary permits or issued licenses for marine hydrokinetic projects that produce energy from waves or directly from the...

  5. 40 CFR 74.10 - Roles-EPA and permitting authority.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Roles-EPA and permitting authority. 74... (CONTINUED) SULFUR DIOXIDE OPT-INS Permitting Procedures § 74.10 Roles—EPA and permitting authority. (a... end-of-year compliance, determining reduced utilization, approving thermal energy transfer and...

  6. 40 CFR 52.2184 - Operating permits for minor sources.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Operating permits for minor sources. 52... permits for minor sources. Emission limitations and related provisions established in South Dakota minor... right to deem permit conditions not federally enforceable. Such a determination will be made according...

  7. 76 FR 40338 - Marine Mammals; Photography Permit No. 16360

    Science.gov (United States)

    2011-07-08

    ... Mammals; Photography Permit No. 16360 AGENCY: National Marine Fisheries Service (NMFS), National Oceanic... photography of cetaceans off Hawaii. ADDRESSES: The permit and related documents are available for review upon... photography on 12 cetacean species had been submitted by the above-named applicant. The requested permit has...

  8. 40 CFR 96.323 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 96.323 Section 96.323 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... the permitting authority, as necessary to facilitate coordination of the renewal of the CAIR permit...

  9. Particulate Matter Filtration Design Considerations for Crewed Spacecraft Life Support Systems

    Science.gov (United States)

    Agui, Juan H.; Vijayakumar, R.; Perry, Jay L.

    2016-01-01

    Particulate matter filtration is a key component of crewed spacecraft cabin ventilation and life support system (LSS) architectures. The basic particulate matter filtration functional requirements as they relate to an exploration vehicle LSS architecture are presented. Particulate matter filtration concepts are reviewed and design considerations are discussed. A concept for a particulate matter filtration architecture suitable for exploration missions is presented. The conceptual architecture considers the results from developmental work and incorporates best practice design considerations.

  10. Interacting dark matter disguised as warm dark matter

    International Nuclear Information System (INIS)

    Boehm, Celine; Riazuelo, Alain; Hansen, Steen H.; Schaeffer, Richard

    2002-01-01

    We explore some of the consequences of dark-matter-photon interactions on structure formation, focusing on the evolution of cosmological perturbations and performing both an analytical and a numerical study. We compute the cosmic microwave background anisotropies and matter power spectrum in this class of models. We find, as the main result, that when dark matter and photons are coupled, dark matter perturbations can experience a new damping regime in addition to the usual collisional Silk damping effect. Such dark matter particles (having quite large photon interactions) behave like cold dark matter or warm dark matter as far as the cosmic microwave background anisotropies or matter power spectrum are concerned, respectively. These dark-matter-photon interactions leave specific imprints at sufficiently small scales on both of these two spectra, which may allow us to put new constraints on the acceptable photon-dark-matter interactions. Under the conservative assumption that the abundance of 10 12 M · galaxies is correctly given by the cold dark matter, and without any knowledge of the abundance of smaller objects, we obtain the limit on the ratio of the dark-matter-photon cross section to the dark matter mass σ γ-DM /m DM -6 σ Th /(100 GeV)≅6x10 -33 cm 2 GeV -1

  11. Analytic study of organic matters in Lodeve uranium ore

    International Nuclear Information System (INIS)

    Campuzano, E.J.

    1981-01-01

    Exploitation of uranium in the Permian basin of Lodeve is difficult because of simultaneous extraction of organic matters which are found, in small proportion, in ammonium diuranate and a supplementary purification is required. Available information on natural organic matters are briefly reviewed. Natural organic matters contained in the Lodeve uranium ore processing fluid is separated and fractionated. Physicochemical properties of ligands in each fraction are studied. The existence of bonds between these ligands and dissolved uranium is experimentally demonstrated [fr

  12. 29 CFR 2.12 - Audiovisual coverage permitted.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Audiovisual coverage permitted. 2.12 Section 2.12 Labor Office of the Secretary of Labor GENERAL REGULATIONS Audiovisual Coverage of Administrative Hearings § 2.12 Audiovisual coverage permitted. The following are the types of hearings where the Department...

  13. 77 FR 10183 - Reissuance of Nationwide Permits

    Science.gov (United States)

    2012-02-21

    ... Civil Works Program (Engineer Circular 1165- 2-211). The current Engineer Circular applies to Corps..., Corps of Engineers Reissuance of Nationwide Permits; Notice #0;#0;Federal Register / Vol. 77 , No. 34..., Corps of Engineers RIN 0710-AA71 Reissuance of Nationwide Permits AGENCY: Army Corps of Engineers, DoD...

  14. The WIPP RCRA Part B permit application for TRU mixed waste disposal

    International Nuclear Information System (INIS)

    Johnson, J.E.

    1995-01-01

    In August 1993, the New Mexico Environment Department (NMED) issued a draft permit for the Waste Isolation Pilot Plant (WIPP) to begin experiments with transuranic (TRU) mixed waste. Subsequently, the Department of Energy (DOE) decided to cancel the on-site test program, opting instead for laboratory testing. The Secretary of the NMED withdrew the draft permit in 1994, ordering the State's Hazardous and Radioactive Waste Bureau to work with the DOE on submittal of a revised permit application. Revision 5 of the WIPP's Resource Conservation and Recovery Act (RCRA) Part B Permit Application was submitted to the NMED in May 1995, focusing on disposal of 175,600 m 3 of TRU mixed waste over a 25 year span plus ten years for closure. A key portion of the application, the Waste Analysis Plan, shifted from requirements to characterize a relatively small volume of TRU mixed waste for on-site experiments, to describing a complete program that would apply to all DOE TRU waste generating facilities and meet the appropriate RCRA regulations. Waste characterization will be conducted on a waste stream basis, fitting into three broad categories: (1) homogeneous solids, (2) soil/gravel, and (3) debris wastes. Techniques used include radiography, visually examining waste from opened containers, radioassay, headspace gas sampling, physical sampling and analysis of homogeneous wastes, and review of documented acceptable knowledge. Acceptable knowledge of the original organics and metals used, and the operations that generated these waste streams is sufficient in most cases to determine if the waste has toxicity characteristics, hazardous constituents, polychlorinated biphenyls (PBCs), or RCRA regulated metals

  15. Decaying dark matter in supersymmetric SU(5) models

    International Nuclear Information System (INIS)

    Luo Mingxing; Wang Liucheng; Wu Wei; Zhu Guohuai

    2010-01-01

    Motivated by recent observations from PAMELA, Fermi and H.E.S.S., we consider dark matter decays in the framework of supersymmetric SU(5) grand unification theories. An SU(5) singlet S is assumed to be the main component of dark matters, which decays into visible particles through dimension six operators suppressed by the grand unification scale. Under certain conditions, S decays dominantly into a pair of sleptons with universal coupling for all generations. Subsequently, electrons and positrons are produced from cascade decays of these sleptons. These cascade decay chains smooth the e + +e - spectrum, which permit naturally a good fit to the Fermi-LAT data. The observed positron fraction upturn by PAMELA can be reproduced simultaneously. We have also calculated diffuse gamma-ray spectra due to the e ± excesses and compared them with the preliminary Fermi-LAT data from 0.1 GeV to 10 GeV in the region 0 deg. ≤l≤ 360 deg., 10 deg. ≤|b|≤20 deg. The photon spectrum of energy above 100 GeV, mainly from final state radiations, may be checked in the near future.

  16. 10 CFR 451.2 - Definitions.

    Science.gov (United States)

    2010-01-01

    ... matter, or from combustion of gases or liquids derived from plant matter, animal wastes, or sewage, or... facility equipment testing, or the date when all approved permits required for facility construction are... from the burning of municipal solid waste; or (2) Heat from a dry steam geothermal reservoir which— (i...

  17. 77 FR 61519 - Commission's Rules of Practice and Procedure

    Science.gov (United States)

    2012-10-10

    ... recognizing the difference between federal court proceedings and the nature of Commission proceedings which.... Further, the nature of the subject matter typically involved in such motions often may require expedited... consistent with FRCP 15(a)(1), to permit amendments to pleadings as a matter of right within 21 days of...

  18. Treatment of solar neutrino-oscillations in solar matter. The MSW effect

    International Nuclear Information System (INIS)

    Messiah, A.

    1986-01-01

    Mikheyev and Smirnov, following Wolfenstein's theory of neutrino oscillations in the presence of matter, have found that the change of flavour of solar neutrinos may be spectacularly enhanced in the presence of solar matter, when the parameters of the neutrino mass operator fall in a suitable range (MSW effect). It is shown that this effect can be readily deduced from the adiatic solution of the equation of flavour evolution. A complete study of the two-flavour case is given, permitting to calculate, for any set of values of the mass operator parameters, the ν e suppression factor at the site of detection on earth. The adiabatic approximation holds over a wide range of the parameters, leading to especially simple expressions. Our calculations cover the whole range, including domains where the adiabatic approximation is no longer valid. Some of the results, presented in a form most suited for an analysis of solar neutrino experiments, are displayed for illustration and discussed. 7 refs

  19. 30 CFR 280.27 - When may MMS cancel my permit?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false When may MMS cancel my permit? 280.27 Section... Part Interrupted Activities § 280.27 When may MMS cancel my permit? The RD may cancel a permit at any time. (a) If we cancel your permit, the RD will advise you by certified or registered mail 30 days...

  20. 75 FR 3731 - Proposed Issuance of a General NPDES Permit for Small Suction Dredging-Permit Number IDG-37-0000

    Science.gov (United States)

    2010-01-22

    ... System (NPDES) general permit to placer mining operations in Idaho for small suction dredges (intake... ENVIRONMENTAL PROTECTION AGENCY [FRL-9104-3] Proposed Issuance of a General NPDES Permit for Small... significant economic impact on a substantial number of small entities.'' EPA has concluded that NPDES general...

  1. Galactic Dark Matter and Terrestrial Periodicities

    National Research Council Canada - National Science Library

    Clube, S

    1998-01-01

    .... The Earth may thus be regarded as a probe of the disc environment; and to account for the periodicity, the Galactic disc is required to have a substantial dark matter component ( approx .15 molar mass/cu pc...

  2. Isotropic radio background from quark nugget dark matter

    Energy Technology Data Exchange (ETDEWEB)

    Lawson, Kyle; Zhitnitsky, Ariel R., E-mail: arz@physics.ubc.ca

    2013-07-09

    Recent measurements by the ARCADE2 experiment unambiguously show an excess in the isotropic radio background at frequencies below the GHz scale. We argue that this excess may be a natural consequence of the interaction of visible and dark matter in the early universe if the dark matter consists of heavy nuggets of quark matter. Explanation of the observed radio band excess requires the introduction of no new parameters, rather we exploit the same dark matter model and identical normalization parameters to those previously used to explain other excesses of diffuse emission from the centre of our galaxy. These previously observed excesses include the WMAP Haze of GHz radiation, keV X-ray emission and MeV gamma-ray radiation.

  3. Analyzing the Discovery Potential for Light Dark Matter.

    Science.gov (United States)

    Izaguirre, Eder; Krnjaic, Gordan; Schuster, Philip; Toro, Natalia

    2015-12-18

    In this Letter, we determine the present status of sub-GeV thermal dark matter annihilating through standard model mixing, with special emphasis on interactions through the vector portal. Within representative simple models, we carry out a complete and precise calculation of the dark matter abundance and of all available constraints. We also introduce a concise framework for comparing different experimental approaches, and use this comparison to identify important ranges of dark matter mass and couplings to better explore in future experiments. The requirement that dark matter be a thermal relic sets a sharp sensitivity target for terrestrial experiments, and so we highlight complementary experimental approaches that can decisively reach this milestone sensitivity over the entire sub-GeV mass range.

  4. Isotropic radio background from quark nugget dark matter

    International Nuclear Information System (INIS)

    Lawson, Kyle; Zhitnitsky, Ariel R.

    2013-01-01

    Recent measurements by the ARCADE2 experiment unambiguously show an excess in the isotropic radio background at frequencies below the GHz scale. We argue that this excess may be a natural consequence of the interaction of visible and dark matter in the early universe if the dark matter consists of heavy nuggets of quark matter. Explanation of the observed radio band excess requires the introduction of no new parameters, rather we exploit the same dark matter model and identical normalization parameters to those previously used to explain other excesses of diffuse emission from the centre of our galaxy. These previously observed excesses include the WMAP Haze of GHz radiation, keV X-ray emission and MeV gamma-ray radiation

  5. Coal Mine Permit Boundaries

    Data.gov (United States)

    Earth Data Analysis Center, University of New Mexico — ESRI ArcView shapefile depicting New Mexico coal mines permitted under the Surface Mining Control and Reclamation Act of 1977 (SMCRA), by either the NM Mining these...

  6. 75 FR 75463 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper...

    Science.gov (United States)

    2010-12-03

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9234-9] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper Company, Luke, MD AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of final action. SUMMARY: Pursuant to section 505(b)(2) of the Clean Air Act (CAA), the...

  7. Moral concerns on tradable pollution permits in international environmental agreements

    Energy Technology Data Exchange (ETDEWEB)

    Eyckmans, Johan [Hogeschool-Universiteit Brussel - HUB, Stormstraat 2, B-1000 Brussels (Belgium); Katholieke Universiteit Leuven, Centrum voor Economische Studien Naamsestraat 69, 3000 Leuven (Belgium); Kverndokk, Snorre [Ragnar Frisch Centre for Economic Research, Gaustadalleen 21, 0349 Oslo (Norway)

    2010-07-15

    We investigate how moral concerns about permit trading affect an endogenous pollution permit trading equilibrium, where governments choose non-cooperatively the amount of permits they allocate to domestic industries. Politicians may feel reluctant to allow permit trading and/or may prefer that abatement is undertaken domestically because of moral concerns. This will have an effect on the initial permit allocations, and, therefore, on global emissions. The impact on global emissions depends on the precise formulation of the moral concerns, but under reasonable assumptions, we show that global emissions may increase. Thus, doing what is perceived as good does not always yield the desired outcome. However, this can be offset by restrictions on permit trading when governments have moral concerns about this trade. (author)

  8. Moral concerns on tradable pollution permits in international environmental agreements

    International Nuclear Information System (INIS)

    Eyckmans, Johan; Kverndokk, Snorre

    2010-01-01

    We investigate how moral concerns about permit trading affect an endogenous pollution permit trading equilibrium, where governments choose non-cooperatively the amount of permits they allocate to domestic industries. Politicians may feel reluctant to allow permit trading and/or may prefer that abatement is undertaken domestically because of moral concerns. This will have an effect on the initial permit allocations, and, therefore, on global emissions. The impact on global emissions depends on the precise formulation of the moral concerns, but under reasonable assumptions, we show that global emissions may increase. Thus, doing what is perceived as good does not always yield the desired outcome. However, this can be offset by restrictions on permit trading when governments have moral concerns about this trade. (author)

  9. Turning off the lights: How dark is dark matter?

    International Nuclear Information System (INIS)

    McDermott, Samuel D.; Yu Haibo; Zurek, Kathryn M.

    2011-01-01

    We consider current observational constraints on the electromagnetic charge of dark matter. The velocity dependence of the scattering cross section through the photon gives rise to qualitatively different constraints than standard dark matter scattering through massive force carriers. In particular, recombination epoch observations of dark matter density perturbations require that ε, the ratio of the dark matter to electronic charge, is less than 10 -6 for m X =1 GeV, rising to ε -4 for m X =10 TeV. Though naively one would expect that dark matter carrying a charge well below this constraint could still give rise to large scattering in current direct detection experiments, we show that charged dark matter particles that could be detected with upcoming experiments are expected to be evacuated from the Galactic disk by the Galactic magnetic fields and supernova shock waves and hence will not give rise to a signal. Thus dark matter with a small charge is likely not a source of a signal in current or upcoming dark matter direct detection experiments.

  10. Dark Matter Reality Check: Chandra Casts Cloud On Alternative Theory

    Science.gov (United States)

    2002-10-01

    New evidence from NASA's Chandra X-ray Observatory challenges an alternative theory of gravity that eliminates the need for dark matter. The observation also narrows the field for competing forms of dark matter, the elusive material thought to be the dominant form of matter in the universe. An observation of the galaxy NGC 720 shows it is enveloped in a slightly flattened, or ellipsoidal cloud of hot gas that has an orientation different from that of the optical image of the galaxy. The flattening is too large to be explained by theories in which stars and gas are assumed to contain most of the mass in the galaxy. "The shape and orientation of the hot gas cloud require it to be confined by an egg-shaped dark matter halo," said David Buote of the University of California, Irvine, and lead author of a report on this research in the 2002 September 20 issue of The Astrophysical Journal. "This means that dark matter is not just an illusion due to a shortcoming of the standard theory of gravity - it is real." According to the generally accepted standard theory of gravity, the hot X-ray cloud would need an additional source of gravity - a halo of dark matter - to keep the hot gas from expanding away. The mass of dark matter required would be about five to ten times the mass of the stars in the galaxy. If the dark matter tracked the optical light from the stars in the galaxy, the hot X-ray cloud would be more round than it is. The flattened shape of the hot gas cloud requires a flattened dark matter halo. An alternative theory of gravity called MOND, for Modified Newtonian Dynamics, was proposed in 1983 by Mordecai Milgrom of the Weizmann Institute in Israel, and has remained viable over the years. MOND does away with the need for dark matter by modifying the theory where the acceleration produced by gravity is very small, such as the outskirts of galaxies. However, MOND cannot explain the Chandra observation of NGC 720. This is apparently the first dynamical evidence that

  11. Deuterium in organic matter

    International Nuclear Information System (INIS)

    Straaten, C.M. van der.

    1981-01-01

    In order to obtain an insight in the processes governing the macroclimate on earth, a knowledge is required of the behaviour of climates in the past. It is well known that D/H ratio of rain varies with temperature determined by latitude as well as by season. Because land plants use this water during the assimilation process, it is expected that the D/H variations are propagated in the organic plant matter. The D/H palaeoclimatic method has therefore been applied to peat to distinguish between the chemical constituents and trace the stable hydrogen fraction in the organic matter. The relation between the hydrogen isotopic composition of precipitation and climatic factors such as the temperature have also been studied. (Auth.)

  12. 30 CFR 784.11 - Operation plan: General requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: General requirements. 784.11... PLAN § 784.11 Operation plan: General requirements. Each application shall contain a description of the... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  13. 30 CFR 780.11 - Operation plan: General requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: General requirements. 780.11... PLAN § 780.11 Operation plan: General requirements. Each application shall contain a description of the... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  14. 78 FR 27249 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-05-09

    ... purpose of enhancing the species' survival. Permit No. TE-99477A Applicant: Benjamin S. Wallace, Fairfield...-99473A Applicant: Joseph D. Henry, San Diego, California The applicant requests a permit to take (capture...

  15. 75 FR 27814 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-05-18

    ... permit to export one female captive bred giant panda (Ailuropoda melanoleuca) born at the zoo in 2005 and... education. The permit numbers and animals are: 070854, Bimbo Jr.; 079868, Vickie; 079870, Jenny; 079871...

  16. 7 CFR 330.203 - Action on applications for permits to move plant pests; form of and conditions in permits.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Action on applications for permits to move plant pests... PEST REGULATIONS; GENERAL; PLANT PESTS; SOIL, STONE, AND QUARRY PRODUCTS; GARBAGE Movement of Plant Pests § 330.203 Action on applications for permits to move plant pests; form of and conditions in...

  17. 78 FR 68085 - Proposed Information Collection; National Wildlife Refuge Special Use Permit Applications and...

    Science.gov (United States)

    2013-11-13

    ... June 30, 2014. We may not conduct or sponsor and a person is not required to respond to a collection of... public recreation when it is not inconsistent or does not interfere with the primary purpose(s) of the... forms serve as both the application and permit. You may view the currently approved forms at http://www...

  18. 21 CFR 206.10 - Code imprint required.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Code imprint required. 206.10 Section 206.10 Food...: GENERAL IMPRINTING OF SOLID ORAL DOSAGE FORM DRUG PRODUCTS FOR HUMAN USE § 206.10 Code imprint required... imprint that, in conjunction with the product's size, shape, and color, permits the unique identification...

  19. RHIC beam permit and quench detection communications system

    International Nuclear Information System (INIS)

    Conkling, C.R. Jr.

    1997-01-01

    A beam permit module has been developed to concentrate RHIC, subsystem sensor outputs, permit beam, and initiate emergency shutdowns. The modules accept inputs from the vacuum, cryogenic, power supply, beam loss, and superconducting magnet quench detection systems. Modules are located at equipment locations around the RHIC ring. The modules are connected by three fiberoptic communications links; a beam permit link, and two magnet power supply interlock links. During operation, carrier presence allows beam. If a RHIC subsystem detects a fault, the beam permit carrier terminates - initiating a beam dump. If the fault was a superconducting magnet quench, a power supply interlock carrier terminates - initiating an emergency magnet power dump. In addition, the master module triggers an event to cause remote sensors to log and hold data at the time-of-failure

  20. arXiv Inelastic Boosted Dark Matter at Direct Detection Experiments

    CERN Document Server

    Giudice, Gian F.; Park, Jong-Chul; Shin, Seodong

    2018-05-10

    We explore a novel class of multi-particle dark sectors, called Inelastic Boosted Dark Matter (iBDM). These models are constructed by combining properties of particles that scatter off matter by making transitions to heavier states (Inelastic Dark Matter) with properties of particles that are produced with a large Lorentz boost in annihilation processes in the galactic halo (Boosted Dark Matter). This combination leads to new signals that can be observed at ordinary direct detection experiments, but require unconventional searches for energetic recoil electrons in coincidence with displaced multi-track events. Related experimental strategies can also be used to probe MeV-range boosted dark matter via their interactions with electrons inside the target material.

  1. FIRE PERMIT NOW ON EDH!

    CERN Multimedia

    TIS General Safety Group or

    2001-01-01

    The electronic version of the Fire Permit form is now active. The aim of the Fire Permit procedure is to reduce the risk of fire or explosion. It is mandatory when performing 'hot work' (mainly activities which involve the use of naked flames or other heat sources - e.g. welding, brazing, cutting, grinding, etc.). Its use is explained in the CERN Fire Protection Code E. (Fire Protection) The new electronic form, which is substantially unchanged from the previous authorizing procedure, will be available on the Electronic Document Handling system (https://edh.cern.ch/) as of 1st September 2001. From this date use of the paper version should be discontinued.

  2. Remediation General Permit (RGP) for Massachusetts & New Hampshire

    Science.gov (United States)

    Documents, links & contacts for the Notice of Availability of the National Pollutant Discharge Elimination System (NPDES) General Permit for Remediation Activity Discharges – the Remediation General Permit in MA (MAG910000) and NH (NHG910000).

  3. Matter, dark matter, and anti-matter in search of the hidden universe

    CERN Document Server

    Mazure, Alain

    2012-01-01

    For over ten years, the dark side of the universe has been headline news. Detailed studies of the rotation of spiral galaxies, and 'mirages' created by clusters of galaxies bending the light from very remote objects, have convinced astronomers of the presence of large quantities of dark (unseen) matter in the cosmos. Moreover, in the 1990s, it was discovered that some four to five billion years ago the expansion of the universe entered a phase of acceleration. This implies the existence of dark energy. The nature of these 'dark; ingredients remains a mystery, but they seem to comprise about 95 percent of the matter/energy content of the universe. As for ordinary matter, although we are immersed in a sea of dark particles, including primordial neutrinos and photons from 'fossil' cosmological radiation, both we and our environment are made of ordinary, baryonic matter. Strangely, even if 15-20 percent of matter is baryonic matter, this represents only 4-5 percent of the total matter/energy content of the cosmos...

  4. Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility

    International Nuclear Information System (INIS)

    1993-08-01

    The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993

  5. Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993.

  6. Hanford Facility dangerous waste permit application, general information

    International Nuclear Information System (INIS)

    1993-05-01

    The current Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, number DOE/RL-91-28) and a treatment, storage, and/or disposal Unit-Specific Portion, which includes documentation for individual TSD units (e.g., document numbers DOE/RL-89-03 and DOE/RL-90-01). Both portions consist of a Part A division and a Part B division. The Part B division consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. Documentation contained in the General Information Portion (i.e., this document, number DOE/RL-91-28) is broader in nature and applies to all treatment, storage, and/or disposal units for which final status is sought. Because of its broad nature, the Part A division of the General Information Portion references the Hanford Facility Dangerous Waste Part A Permit Application (document number DOE/RL-88-21), a compilation of all Part A documentation for the Hanford Facility

  7. Quantifying Matter

    CERN Document Server

    Angelo, Joseph A

    2011-01-01

    Quantifying Matter explains how scientists learned to measure matter and quantify some of its most fascinating and useful properties. It presents many of the most important intellectual achievements and technical developments that led to the scientific interpretation of substance. Complete with full-color photographs, this exciting new volume describes the basic characteristics and properties of matter. Chapters include:. -Exploring the Nature of Matter. -The Origin of Matter. -The Search for Substance. -Quantifying Matter During the Scientific Revolution. -Understanding Matter's Electromagnet

  8. Permit application modifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils.

  9. Permit application modifications

    International Nuclear Information System (INIS)

    1995-11-01

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils

  10. PERMITTING HAZARDOUS WASTE INCINERATORS

    Science.gov (United States)

    This publication is a compilation of information presented at a seminar series designed to address the issues that affect the issuance of hazardous waste incineration permits and to improve the overall understanding of trial burn testing. pecifically, the document provides guidan...

  11. Dark Matter

    Directory of Open Access Journals (Sweden)

    Einasto J.

    2011-06-01

    Full Text Available I give a review of the development of the concept of dark matter. The dark matter story passed through several stages from a minor observational puzzle to a major challenge for theory of elementary particles. Modern data suggest that dark matter is the dominant matter component in the Universe, and that it consists of some unknown non-baryonic particles. Dark matter is the dominant matter component in the Universe, thus properties of dark matter particles determine the structure of the cosmic web.

  12. Dark matter relics and the expansion rate in scalar-tensor theories

    Energy Technology Data Exchange (ETDEWEB)

    Dutta, Bhaskar; Jimenez, Esteban [Mitchell Institute for Fundamental Physics and Astronomy, Department of Physics and Astronomy, Texas A and M University, College Station, TX 77843 (United States); Zavala, Ivonne, E-mail: dutta@physics.tamu.edu, E-mail: este1985@physics.tamu.edu, E-mail: e.i.zavalacarrasco@swansea.ac.uk [Department of Physics, Swansea University, Singleton Park, Swansea, SA2 8PP (United Kingdom)

    2017-06-01

    We study the impact of a modified expansion rate on the dark matter relic abundance in a class of scalar-tensor theories. The scalar-tensor theories we consider are motivated from string theory constructions, which have conformal as well as disformally coupled matter to the scalar. We investigate the effects of such a conformal coupling to the dark matter relic abundance for a wide range of initial conditions, masses and cross-sections. We find that exploiting all possible initial conditions, the annihilation cross-section required to satisfy the dark matter content can differ from the thermal average cross-section in the standard case. We also study the expansion rate in the disformal case and find that physically relevant solutions require a nontrivial relation between the conformal and disformal functions. We study the effects of the disformal coupling in an explicit example where the disformal function is quadratic.

  13. 18 CFR 157.15 - Requirements for applications covering acquisitions.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Requirements for... Requirements for applications covering acquisitions. An application for a certificate authorizing acquisition... all of vendor's facilities. (e) Any franchise, license, or permit respecting the facilities involved...

  14. Hanford facility dangerous waste permit application, PUREX storage tunnels

    International Nuclear Information System (INIS)

    Price, S.M.

    1997-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the PUREX Storage Tunnels (this document, DOE/RL-90-24). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the US Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. A checklist indicating where information is contained in the PUREX Storage Tunnels permit application documentation, in relation to the Washington State Department of Ecology guidance, is located in the Contents Section. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the PUREX Storage Tunnels permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this PUREX Storage Tunnels permit application documentation is current as of April 1997

  15. Staging of cortical and deep grey matter functional connectivity changes in multiple sclerosis.

    Science.gov (United States)

    Meijer, Kim A; Eijlers, Anand J C; Geurts, Jeroen J G; Schoonheim, Menno M

    2018-02-01

    Functional connectivity is known to increase as well as decrease throughout the brain in multiple sclerosis (MS), which could represent different stages of the disease. In addition, functional connectivity changes could follow the atrophy pattern observed with disease progression, that is, moving from the deep grey matter towards the cortex. This study investigated when and where connectivity changes develop and explored their clinical and cognitive relevance across different MS stages. A cohort of 121 patients with early relapsing-remitting MS (RRMS), 122 with late RRMS and 53 with secondary progressive MS (SPMS) as well as 96 healthy controls underwent MRI and neuropsychological testing. Functional connectivity changes were investigated for (1) within deep grey matter connectivity, (2) connectivity between the deep grey matter and cortex and (3) within-cortex connectivity. A post hoc regional analysis was performed to identify which regions were driving the connectivity changes. Patients with late RRMS and SPMS showed increased connectivity of the deep grey matter, especially of the putamen and palladium, with other deep grey matter structures and with the cortex. Within-cortex connectivity was decreased, especially for temporal, occipital and frontal regions, but only in SPMS relative to early RRMS. Deep grey matter connectivity alterations were related to cognition and disability, whereas within-cortex connectivity was only related to disability. Increased connectivity of the deep grey matter became apparent in late RRMS and further increased in SPMS. The additive effect of cortical network degeneration, which was only seen in SPMS, may explain the sudden clinical deterioration characteristic to this phase of the disease. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  16. Mirror matter as self-interacting dark matter

    International Nuclear Information System (INIS)

    Mohapatra, R.N.; Nussinov, S.; Teplitz, V.L.

    2002-01-01

    It has been argued that the observed core density profile of galaxies is inconsistent with having a dark matter particle that is collisionless and that alternative dark matter candidates which are self-interacting may explain observations better. One new class of self-interacting dark matter that has been proposed in the context of mirror universe models of particle physics is the mirror hydrogen atom, whose stability is guaranteed by the conservation of mirror baryon number. We show that the effective transport cross section for mirror hydrogen atoms has the right order of magnitude for solving the 'cuspy' halo problem. Furthermore, the suppression of dissipation effects for mirror atoms due to a higher mirror mass scale prevents the mirror halo matter from collapsing into a disk, strengthening the argument for mirror matter as galactic dark matter

  17. A quark matter contribution to the cosmic ray spectrum

    International Nuclear Information System (INIS)

    Lawson, K.

    2013-01-01

    I will describe a possible dark matter model in which the dark matter is composed of heavy nuggets of standard model quarks and antiquarks bound in a high density phase of QCD. If objects of this type are formed early in the universe's history they may provide the observed dark matter content. In this scenario the nuggets are dark not because of their fundamentally weak interactions but because of the incredibly small number density required to explain the observed mass density of the dark matter. The correspondingly small flux of these objects through the earth renders them invisible to conventional high sensitivity dark matter searches intended to detect weakly interacting particles with a flux many orders of magnitude larger. Instead the greatest search potential for dark matter models of this form may come from the largest scale cosmic ray detectors. I will briefly describe the properties of quark nugget dark matter and then use these properties in order to predict the signal they would produce in a variety of cosmic ray detectors. (authors)

  18. Bounds on dark matter interactions with electroweak gauge bosons

    Energy Technology Data Exchange (ETDEWEB)

    Cotta, R. C.; Hewett, J. L.; Le, M. -P.; Rizzo, T. G.

    2013-12-01

    We investigate scenarios in which dark matter interacts with the Standard Model primarily through electroweak gauge bosons. We employ an effective field theory framework wherein the Standard Model and the dark matter particle are the only light states in order to derive model-independent bounds. Bounds on such interactions are derived from dark matter production by weak boson fusion at the LHC, indirect detection searches for the products of dark matter annihilation and from the measured invisible width of the Z 0 . We find that limits on the UV scale, Λ , reach weak scale values for most operators and values of the dark matter mass, thus probing the most natural scenarios in the weakly interacting massive particle dark matter paradigm. Our bounds suggest that light dark matter ( m χ ≲ m Z / 2 or m χ ≲ 100 – 200 GeV , depending on the operator) cannot interact only with the electroweak gauge bosons of the Standard Model, but rather requires additional operator contributions or dark sector structure to avoid overclosing the Universe.

  19. Evidence for dark matter interactions in cosmological precision data?

    International Nuclear Information System (INIS)

    Lesgourgues, Julien; Marques-Tavares, Gustavo; Schmaltz, Martin

    2016-01-01

    We study a two-parameter extension of the cosmological standard model ΛCDM in which cold dark matter interacts with a new form of dark radiation. The two parameters correspond to the energy density in the dark radiation fluid ΔN fluid and the interaction strength between dark matter and dark radiation. The interactions give rise to a very weak ''dark matter drag'' which damps the growth of matter density perturbations throughout radiation domination, allowing to reconcile the tension between predictions of large scale structure from the CMB and direct measurements of σ 8 . We perform a precision fit to Planck CMB data, BAO, large scale structure, and direct measurements of the expansion rate of the universe today. Our model lowers the χ-squared relative to ΛCDM by about 12, corresponding to a preference for non-zero dark matter drag by more than 3σ. Particle physics models which naturally produce a dark matter drag of the required form include the recently proposed non-Abelian dark matter model in which the dark radiation corresponds to massless dark gluons

  20. AQUIS: An air quality and permit information management system

    Energy Technology Data Exchange (ETDEWEB)

    Smith, A.E.; Huber, C.C.; Tschanz, J. (Argonne National Lab., IL (USA)); Ryckman, S.J. Jr. (Air Force Logistics Command, Wright-Patterson AFB, OH (USA))

    1991-01-01

    The Air Quality Utility Information System (AQUIS) is a data base management system that operates on a dedicated, IBM-compatible personal computer using dBASE IV. AQUIS is in operation at six of the seven US Air Force Logistics Command (AFLC) bases to assist with the management of the source inventory, permit tracking, and the estimating and tracking of emissions. The system also provides environmental management personnel with information on regulatory requirements and other compliance information. An AFLC base can have over 500 regulated or unregulated emission sources, and the task of tracking and correlating emissions, sources, and permits is substantial. AQUIS is a comprehensive management tool that provides a single system for storing and accessing information previously available only in multiple, uncorrelated files. This paper discusses the development of the system and provides an overview of the system structure and the relationship of that structure to sources in the field. Certain features such as the linking capability and compound-specific emissions are highlighted. The experience of environmental managers, the ultimate system users, is discussed, including specific ways in which AQUIS has proven useful in responding to managers' needs for air quality information. 10 refs., 3 figs., 1 tab.

  1. Matter and symbols of the artificial

    Energy Technology Data Exchange (ETDEWEB)

    Rocha, L.M.

    1998-08-01

    The study of complex systems should be based on a systems-theoretic framework which requires both self-organizing and symbolic dimensions. An inclusive framework based on the notion of semiotics is advanced to build models capable of representing, as well as evolving in their environments, with implications for Artificial Life. Such undertaking is pursued by discussing the ways in which symbol and matter are irreducibly intertwined in evolutionary systems. The problem is thus phrased in terms of the semiotic categories of syntax, semantics, and pragmatics. With this semiotic view of matter and symbols the requirements of semiotic closure are expressed in models with both self-organizing and symbolic characteristics. Situated action and recent developments in the evolution of cellular automata rules to solve non-trivial tasks are discussed in this context. Finally, indirect encoding schemes for genetic algorithms are developed which follow the semiotic framework here proposed.

  2. Anitproton-matter interactions in antiproton applications

    Science.gov (United States)

    Morgan, David L., Jr.

    1990-01-01

    By virtue of the highly energetic particles released when they annihilate in matter, antiprotons have a variety of potentially important applications. Among others, these include remote 3-D density and composition imaging of the human body and also of thick, dense materials, cancer therapy, and spacecraft propulsion. Except for spacecraft propulsion, the required numbers of low energy antiprotons can be produced, stored, and transported through reliance on current or near term technology. Paramount to these applications and to fundamental research involving antiprotons is knowledge of how antiprotons interact with matter. The basic annihilation process is fairly well understood, but the antiproton annihilation and energy loss rates in matter depend in complex ways on a number of atomic processes. The rates, and the corresponding cross sections, were measured or are accurately predictable only for limited combinations of antiproton kinetic energy and material species.

  3. Number-theory dark matter

    International Nuclear Information System (INIS)

    Nakayama, Kazunori; Takahashi, Fuminobu; Yanagida, Tsutomu T.

    2011-01-01

    We propose that the stability of dark matter is ensured by a discrete subgroup of the U(1) B-L gauge symmetry, Z 2 (B-L). We introduce a set of chiral fermions charged under the U(1) B-L in addition to the right-handed neutrinos, and require the anomaly-cancellation conditions associated with the U(1) B-L gauge symmetry. We find that the possible number of fermions and their charges are tightly constrained, and that non-trivial solutions appear when at least five additional chiral fermions are introduced. The Fermat theorem in the number theory plays an important role in this argument. Focusing on one of the solutions, we show that there is indeed a good candidate for dark matter, whose stability is guaranteed by Z 2 (B-L).

  4. Asymmetric dark matter and the Sun

    DEFF Research Database (Denmark)

    Frandsen, Mads Toudal; Sarkar, Subir

    2010-01-01

    Cold dark matter particles with an intrinsic matter-antimatter asymmetry do not annihilate after gravitational capture by the Sun and can affect its interior structure. The rate of capture is exponentially enhanced when such particles have self-interactions of the right order to explain structure...... formation on galactic scales. A `dark baryon' of mass 5 GeV is a natural candidate and has the required relic abundance if its asymmetry is similar to that of ordinary baryons. We show that such particles can solve the `solar composition problem'. The predicted small decrease in the low energy neutrino...

  5. On baryogenesis from dark matter annihilation

    International Nuclear Information System (INIS)

    Bernal, Nicolás; Colucci, Stefano; Ubaldi, Lorenzo; Josse-Michaux, François-Xavier; Racker, J.

    2013-01-01

    We study in detail the conditions to generate the baryon asymmetry of the universe from the annihilation of dark matter. This scenario requires a low energy mechanism for thermal baryogenesis, hence we first discuss some of these mechanisms together with the specific constraints due to the connection with the dark matter sector. Then we show that, contrary to what stated in previous studies, it is possible to generate the cosmological asymmetry without adding a light sterile dark sector, both in models with violation and with conservation of B−L. In addition, one of the models we propose yields some connection to neutrino masses

  6. Nanoscale control of energy and matter in plasma-surface interactions: Toward energy- and matter-efficient nanotech

    International Nuclear Information System (INIS)

    Ostrikov, K.

    2011-01-01

    The approach to control the elementary processes of plasma-surface interactions to direct the fluxes of energy and matter at nano- and subnanometer scales is introduced. This ability is related to the solution of the grand challenge of directing energy and matter at nanoscales and is critical for the renewable energy and energy-efficient technologies for a sustainable future development. The examples of deterministic synthesis of self-organized arrays of metastable nanostructures in the size range beyond the reach of the present-day nanofabrication are considered to illustrate this possibility. By using precisely controlled and kinetically fast nanoscale transfer of energy and matter under nonequilibrium conditions and harnessing numerous plasma-specific controls of species creation, delivery to the surface, nucleation, and large-scale self-organization of nuclei and nanostructures, the arrays of metastable nanostructures can be created, arranged, stabilized, and further processed to meet the specific requirements of the envisaged applications.

  7. 78 FR 57650 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-09-19

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  8. 77 FR 12611 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-03-01

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  9. 77 FR 5045 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-02-01

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... certain activities with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity...

  10. 78 FR 16703 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-03-18

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  11. 78 FR 55287 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-09-10

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  12. 78 FR 26384 - Endangered and Threatened Wildlife and Plants; Recovery Permit Applications

    Science.gov (United States)

    2013-05-06

    ... E. Freemont Lake Road, Pinedale, WY 82941 The applicant requests the renewal of an existing permit... the permit you are interested in by number (e.g., Permit No. TE-106387). Email: [email protected] . Please refer to the respective permit number (e.g., Permit No. TE-106387) in the subject line of the...

  13. Tradeable emission permits in Dutch environmental policy. A utopia?

    International Nuclear Information System (INIS)

    Schuurman, S.J.

    1997-01-01

    Because of the lack of experience with permits in the Netherlands, and in view of the similarities between various other tradeable permit systems, the functioning of Dutch systems of tradeable fish, milk and manure quotas is discussed. Evaluation of these systems is based on criteria of effectiveness, target-group efficiency and government efficiency. These systems of tradeable permits appear to constitute a successful addition to the Dutch policy of direct regulation. Considering this, and the favorable American experience with the Emissions Trading Program, tradeable emission permits deserve a chance to be implemented in Dutch environmental policy. The question remains, however, whether the Dutch government is ready for such a step. 28 refs

  14. Tradable CO2 permits in Danish and European energy policy

    DEFF Research Database (Denmark)

    Varming, S.; Eriksen, P.B.; Grohnheit, Poul Erik

    2000-01-01

    This report presents the results of the project "Tradable CO2 permits in Danish and European energy policy". The project was financed by a grant from the Danish Energy Research Programme 1998 (Grant 1753/98-0002). The project was conducted in co-operationbetween Elsamprojekt A/S (project manager...... for a tradable CO_2 permit market for the energy sector in the EU. Experience from the tradable SO_2 permit market in the US is taken into consideration as well. Topresent an overview of price estimates of CO_2 and greenhouse gas permits in different models as well as discussing the assumptions leading...... to the different outcomes. Furthermore, the special role of backstop technologies in relation to permit prices isanalysed. To analyse the connection between CO_2 permit prices and technology choice in the energy sector in the medium and longer term (i.e., 2010 and 2020) with a special emphasis on combined heat...

  15. 78 FR 57410 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2013-09-18

    ... permits to conduct certain activities with endangered species under the authority of the Endangered Species Act, as amended (Act). ADDRESSES: Endangered Species Program Manager, Ecological Services, U.S...-FF01E00000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION...

  16. 48 CFR 3.402 - Statutory requirements.

    Science.gov (United States)

    2010-10-01

    ... that, for breach or violation of the warranty by the contractor, the Government may annul the contract.... Contractors' arrangements to pay contingent fees for soliciting or obtaining Government contracts have long... policy but permitted certain exceptions. These statutes— (a) Require in every negotiated contract a...

  17. 30 CFR 250.187 - What are MMS' incident reporting requirements?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What are MMS' incident reporting requirements... Reporting Requirements § 250.187 What are MMS' incident reporting requirements? (a) You must report all... other permit issued by MMS, and that are related to operations resulting from the exercise of your...

  18. 40 CFR 72.73 - State issuance of Phase II permits.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false State issuance of Phase II permits. 72.73 Section 72.73 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.73 State issuance of Phase II permits...

  19. Solid Matter

    CERN Document Server

    Angelo, Joseph A

    2011-01-01

    Supported by a generous quantity of full-color illustrations and interesting sidebars, Solid Matter introduces the basic characteristics and properties of solid matter. It briefly describes the cosmic connection of the elements, leading readers through several key events in human pre-history that resulted in more advanced uses of matter in the solid state. Chapters include:. -Solid Matter: An Initial Perspective. -Physical Behavior of Matter. -The Gravity of Matter. -Fundamentals of Materials Science. -Rocks and Minerals. -Metals. -Building Materials. -Carbon Earth's Most Versatile Element. -S

  20. 75 FR 19987 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2010-04-16

    ... applied for scientific research permits to conduct certain activities with endangered species under the...) within Arizona. Permit TE-178778 Applicant: Marks Lab of Aquatic Ecology, Flagstaff, Arizona. Applicant...

  1. D-brane disformal coupling and thermal dark matter

    Science.gov (United States)

    Dutta, Bhaskar; Jimenez, Esteban; Zavala, Ivonne

    2017-11-01

    Conformal and disformal couplings between a scalar field and matter occur naturally in general scalar-tensor theories. In D-brane models of cosmology and particle physics, these couplings originate from the D-brane action describing the dynamics of its transverse (the scalar) and longitudinal (matter) fluctuations, which are thus coupled. During the post-inflationary regime and before the onset of big bang nucleosynthesis (BBN), these couplings can modify the expansion rate felt by matter, changing the predictions for the thermal relic abundance of dark matter particles and thus the annihilation rate required to satisfy the dark matter content today. We study the D-brane-like conformal and disformal couplings effect on the expansion rate of the Universe prior to BBN and its impact on the dark matter relic abundance and annihilation rate. For a purely disformal coupling, the expansion rate is always enhanced with respect to the standard one. This gives rise to larger cross sections when compared to the standard thermal prediction for a range of dark matter masses, which will be probed by future experiments. In a D-brane-like scenario, the scale at which the expansion rate enhancement occurs depends on the string coupling and the string scale.

  2. Emissions Inventory Report Summary for Los Alamos National Laboratory for Calendar Year 2009

    Energy Technology Data Exchange (ETDEWEB)

    Environmental Stewardship Group

    2010-10-01

    Los Alamos National Laboratory (LANL) is subject to annual emissions reporting requirements for regulated air pollutants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), Notice of Intent and Emissions Inventory Requirements. The applicability of the requirements is based on the Laboratory's potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. Additionally, on April 30, 2004, LANL was issued a Title V Operating Permit from the New Mexico Environment Department/Air Quality Bureau, under 20.2.70 NMAC. This permit was modified and reissued on July 16, 2007. This Title V Operating Permit (Permit No. P-100M2) includes emission limits and operating limits for all regulated sources of air pollution at LANL. The Title V Operating Permit also requires semiannual emissions reporting for all sources included in the permit. This report summarizes both the annual emissions inventory reporting and the semiannual emissions reporting for LANL for calendar year 2009. LANL's 2009 emissions are well below the emission limits in the Title V Operating Permit.

  3. Emissions inventory report summary for Los Alamos National Laboratory for calendar year 2008

    Energy Technology Data Exchange (ETDEWEB)

    Ecology and Air Quality Group

    2009-10-01

    Los Alamos National Laboratory (LANL) is subject to annual emissions reporting requirements for regulated air pollutants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), Notice of Intent and Emissions Inventory Requirements. The applicability of the requirements is based on the Laboratory’s potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. Additionally, on April 30, 2004, LANL was issued a Title V Operating Permit from the New Mexico Environment Department/Air Quality Bureau, under 20.2.70 NMAC. This permit was modified and reissued on July 16, 2007. This Title V Operating Permit (Permit No. P-100M2) includes emission limits and operating limits for all regulated sources of air pollution at LANL. The Title V Operating Permit also requires semiannual emissions reporting for all sources included in the permit. This report summarizes both the annual emissions inventory reporting and the semiannual emissions reporting for LANL for calendar year 2008. LANL’s 2008 emissions are well below the emission limits in the Title V Operating Permit.

  4. 50 CFR 300.182 - HMS international trade permit.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false HMS international trade permit. 300.182... FISHERIES REGULATIONS International Trade Documentation and Tracking Programs for Highly Migratory Species § 300.182 HMS international trade permit. (a) General. An importer, entering for consumption fish or...

  5. 76 FR 6490 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-02-04

    ... permit to take (trap, seine, capture, handle, fin clip, release, collect, transport, and captive breed... requests a permit to take (capture, handle, collect, transport, and kill) the Lost River sucker (Deltistes... Service, invite the public to comment on the following applications to conduct certain activities with...

  6. Air emission points for facilities in Iowa with operating permits for Title V of the Federal Clean Air Act_considered MAJOR permits

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — Air emission points for facilities in Iowa with operating permits for Title V of the Federal Clean Air Act, considered "major" permits. Also includes emission points...

  7. Low-Level Burial Grounds Dangerous Waste Permit Application

    International Nuclear Information System (INIS)

    1989-01-01

    The single dangerous waste permit identification number issued to the Hanford Site by the US Environmental Protection Agency and the Washington State Department of Ecology is US Environmental Protection Agency/State Identification Number WA 7890008967. This identification number encompasses a number of waste management units within the Hanford Site. Westinghouse Hanford Company is a major contractor to the US Department of Energy-Richland Operations Office and serves as co-operator of the Low-Level Burial Grounds, the waste management unit addressed by this permit application. The Low-Level Burial Grounds Dangerous Waste Permit Application consists of both a Part A and a Part B Permit Application. The original Part A, submitted in November 1985, identified landfills, retrievable storage units, and reserved areas. An explanation of subsequent Part A revisions is provided at the beginning of the Part A section. Part B consists of 15 chapters addressing the organization and content of the Part B checklist prepared by the Washington State Department of Ecology

  8. 76 FR 75897 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-12-05

    ...: EA Engineering, Science, and Technology, Lewisville, Texas. Applicant requests a new permit for... atricapilla) within Texas. Permit TE-37047A Applicant: Sea World Parks and Entertainment, San Antonio, Texas...

  9. The Clean-Development Mechanism, stochastic permit prices and energy investments

    International Nuclear Information System (INIS)

    Hieronymi, Philipp; Schüller, David

    2015-01-01

    We analyze the impact on energy investments stemming from different emission permit classes, by considering permits that are allocated inside the European Emission Trading Scheme and secondary Certified Emission Reduction (sCER) permits originating from the Clean Development Mechanism. One price taking firm which is subject to emission regulation has the choice to invest in gas or wind power plant. The firm faces uncertainty regarding stochastically evolving permit prices, while it receives a premium on the electricity price for wind energy. As a first step, we determine the value of the option to invest into a gas power plant over time. Then, we calculate the investment probability of a gas power investment in a range of policy scenarios. We find that allowing the usage of sCER permits in the present policy framework has a positive impact on gas power investment. Decoupling the price processes has a similar effect. If the quota of sCER permits is doubled, the decrease in the investment probability for wind power is large. We carry out sensitivity tests for different parameter values, and find that investment behavior changes significantly with differing interest rates, the wind energy premium and volatility. - Highlights: • We model the impact of two CO 2 permit classes on energy investments. • We present a real-options framework accounting for uncertainty. • Clean Development Mechanism permits have a negative influence on investment into renewable energy. • Interest rate and volatility values have a strong impact on the results

  10. The Equation of State of Neutron Star Matter in Strong Magnetic Fields

    International Nuclear Information System (INIS)

    Broderick, A.; Prakash, M.; Lattimer, J. M.

    2000-01-01

    We study the effects of very strong magnetic fields on the equation of state (EOS) in multicomponent, interacting matter by developing a covariant description for the inclusion of the anomalous magnetic moments of nucleons. For the description of neutron star matter, we employ a field-theoretical approach, which permits the study of several models that differ in their behavior at high density. Effects of Landau quantization in ultrastrong magnetic fields (B>10 14 G) lead to a reduction in the electron chemical potential and a substantial increase in the proton fraction. We find the generic result for B>10 18 G that the softening of the EOS caused by Landau quantization is overwhelmed by stiffening due to the incorporation of the anomalous magnetic moments of the nucleons. In addition, the neutrons become completely spin polarized. The inclusion of ultrastrong magnetic fields leads to a dramatic increase in the proton fraction, with consequences for the direct Urca process and neutron star cooling. The magnetization of the matter never appears to become very large, as the value of |H/B| never deviates from unity by more than a few percent. Our findings have implications for the structure of neutron stars in the presence of large frozen-in magnetic fields. (c) 2000 The American Astronomical Society

  11. The Equation of State of Neutron Star Matter in Strong Magnetic Fields

    Energy Technology Data Exchange (ETDEWEB)

    Broderick, A; Prakash, M; Lattimer, J M

    2000-07-01

    We study the effects of very strong magnetic fields on the equation of state (EOS) in multicomponent, interacting matter by developing a covariant description for the inclusion of the anomalous magnetic moments of nucleons. For the description of neutron star matter, we employ a field-theoretical approach, which permits the study of several models that differ in their behavior at high density. Effects of Landau quantization in ultrastrong magnetic fields (B>10{sup 14} G) lead to a reduction in the electron chemical potential and a substantial increase in the proton fraction. We find the generic result for B>10{sup 18} G that the softening of the EOS caused by Landau quantization is overwhelmed by stiffening due to the incorporation of the anomalous magnetic moments of the nucleons. In addition, the neutrons become completely spin polarized. The inclusion of ultrastrong magnetic fields leads to a dramatic increase in the proton fraction, with consequences for the direct Urca process and neutron star cooling. The magnetization of the matter never appears to become very large, as the value of |H/B| never deviates from unity by more than a few percent. Our findings have implications for the structure of neutron stars in the presence of large frozen-in magnetic fields. (c) 2000 The American Astronomical Society.

  12. 19 CFR 12.99 - Procedures for permitted entry.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Procedures for permitted entry. 12.99 Section 12.99 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY SPECIAL CLASSES OF MERCHANDISE Switchblade Knives § 12.99 Procedures for permitted entry...

  13. On the use of exchange rates as trading rules in a bilateral system of transferable discharge permits

    International Nuclear Information System (INIS)

    Rodriguez, F.

    2000-01-01

    The use of a system of transferable discharge permits to control the harmful effects of non-uniformly mixed pollutants requires the application of trading rules in order to prevent permit trading among sources from violating environmental standards. The elements and properties of bilateral trading rules can be analyzed more easily once formulated as exchange rates, which would convert, in a cost-effective way, the emission right potentially given up by the seller into an offsetting emission right acquired by the buyer. In this article, a new expression for such exchange rates is proposed and then analyzed to infer some unexplored properties of the system. 8 refs

  14. The compressed baryonic matter experiment at FAIR

    International Nuclear Information System (INIS)

    Senger, Peter

    2015-01-01

    Substantial experimental and theoretical efforts worldwide are devoted to explore the phase diagram of strongly interacting matter. At top RHIC and LHC energies, the QCD phase diagram is studied at very high temperatures and very low net-baryon densities. These conditions presumably existed in the early universe about a microsecond after the big bang. For larger net-baryon densities and lower temperatures, it is expected that the QCD phase diagram exhibits a rich structure such as a critical point, a first order phase transition between hadronic and partonic matter, or new phases like quarkyonic matter. The experimental discovery of these prominent landmarks of the QCD phase diagram would be a major breakthrough in our understanding of the properties of nuclear matter. The Compressed Baryonic Matter (CBM) experiment will be one of the major scientific pillars of the future Facility for Antiproton and Ion Research (FAIR) in Darmstadt. The goal of the CBM research program is to explore the QCD phase diagram in the region of high baryon densities using high-energy nucleus-nucleus collisions. This includes the study of the equation-of-state of nuclear matter at neutron star core densities, and the search for the deconfinement and chiral phase transitions. The CBM detector is designed to measure rare diagnostic probes such as multi-strange hyperons, charmed particles and vector mesons decaying into lepton pairs with unprecedented precision and statistics. Most of these particles will be studied for the first time in the FAIR energy range. In order to achieve the required precision, the measurements will be performed at very high reaction rates of 100 kHz to 10 MHz. This requires very fast and radiation-hard detectors, and a novel data read-out and analysis concept based on free streaming front-end electronics and a high-performance computing cluster for online event selection. The layout, the physics performance, and the status of the proposed CBM experimental facility

  15. MIDAS - an atomic force microscope for in-situ imaging of cometary dust particles

    International Nuclear Information System (INIS)

    Fehringer, H.M.; Ruedenauer, F.G.; Steiger, W.

    1997-02-01

    Comets are interesting bodies, since they are considered to consist of matter remaining in essentially unchanged chemistry from the presolar nebula. Investigation of cometary matter therefore permits to draw conclusion s with respect to the composition of presolar matter. The atomic force microscope MIDAS will be the first instrument to analyze, within ESA's ROSETTA-mission priestine cometary matter in the form of dust particles emitted by comet WIRTANEN during its perihelion in 2013. Within this project, a dust model has been developed, permitting estimation of dust collection times required for statistically significant imaging of cometary particles. The dynamics of dust collection has been developed and experimental dust collection surfaces have been produced making use of modem nanostructuring techniques. Mechanical properties of 3-dimensional piezo-control elements, which are an essential part of the MIDAS microscope, have been determined. (author)

  16. Holographic duality in condensed matter physics

    CERN Document Server

    Zaanen, Jan; Sun, Ya-Wen; Schalm, Koenraad

    2015-01-01

    A pioneering treatise presenting how the new mathematical techniques of holographic duality unify seemingly unrelated fields of physics. This innovative development morphs quantum field theory, general relativity and the renormalisation group into a single computational framework and this book is the first to bring together a wide range of research in this rapidly developing field. Set within the context of condensed matter physics and using boxes highlighting the specific techniques required, it examines the holographic description of thermal properties of matter, Fermi liquids and superconductors, and hitherto unknown forms of macroscopically entangled quantum matter in terms of general relativity, stars and black holes. Showing that holographic duality can succeed where classic mathematical approaches fail, this text provides a thorough overview of this major breakthrough at the heart of modern physics. The inclusion of extensive introductory material using non-technical language and online Mathematica not...

  17. Cryogenic and Gas System Piping Pressure Tests (A Collection of PT Permits)

    International Nuclear Information System (INIS)

    Rucinski, Russell A.

    2002-01-01

    This engineering note is a collection of pipe pressure testing documents for various sections of piping for the D-Zero cryogenic and gas systems. High pressure piping must conform with FESHM chapter 5031.1. Piping lines with ratings greater than 150 psig have a pressure test done before the line is put into service. These tests require the use of pressure testing permits. It is my intent that all pressure piping over which my group has responsibility conforms to the chapter. This includes the liquid argon and liquid helium and liquid nitrogen cryogenic systems. It also includes the high pressure air system, and the high pressure gas piping of the WAMUS and MDT gas systems. This is not an all inclusive compilation of test documentation. Some piping tests have their own engineering note. Other piping section test permits are included in separate safety review documents. So if it isn't here, that doesn't mean that it wasn't tested. D-Zero has a back up air supply system to add reliability to air compressor systems. The system includes high pressure piping which requires a review per FESHM 5031.1. The core system consists of a pressurized tube trailer, supply piping into the building and a pressure reducing regulator tied into the air compressor system discharge piping. Air flows from the trailer if the air compressor discharge pressure drops below the regulator setting. The tube trailer is periodically pumped back up to approximately 2000 psig. A high pressure compressor housed in one of the exterior buildings is used for that purpose. The system was previously documented, tested and reviewed for Run I, except for the recent addition of piping to and from the high pressure compressor. The following documents are provided for review of the system: (1) Instrument air flow schematic, drg. 3740.000-ME-273995 rev. H; (2) Component list for air system; (3) Pressure testing permit for high pressure piping; (4) Documentation from Run I contained in D-Zero Engineering note

  18. Pricing emission permits in the absence of abatement

    International Nuclear Information System (INIS)

    Hintermann, Beat

    2012-01-01

    If emissions are stochastic and firms are unable to control them through abatement, the cap in a permit market may be exceeded, or not be reached. I derive a binary options pricing formula that expresses the permit price as a function of the penalty for noncompliance and the probability of an exceeded cap under the assumption of no abatement. I apply my model to the EU ETS, where the rapid introduction of the market made it difficult for firms to adjust their production technology in time for the first phase. The model fits the data well, implying that the permit price may have been driven by firms hedging against stochastic emissions.

  19. Capital Requirements and Credit Rationing

    OpenAIRE

    Itai Agur

    2010-01-01

    This paper analyzes the trade-off between financial stability and credit rationing that arises when increasing capital requirements. It extends the Stiglitz-Weiss model of credit rationing to allow for bank default. Bank capital structure then matters for lending incentives. With default and rationing endogenous, optimal capital requirements can be analyzed. Introducing bank financiers, the paper also shows that uninsured funding raises the sensitivity of rationing to capital requirements. In...

  20. Cosmic Ray Signatures of Decaying Dark Matter

    International Nuclear Information System (INIS)

    Ibarra, Alejandro

    2011-01-01

    Astrophysical and cosmological observations do not require the dark matter particles to be absolutely stable. If they are indeed unstable, their decay into Standard Model particles might occur at a sufficiently large rate to allow the indirect detection of dark matter through an anomalous contribution to the high energy cosmic ray fluxes. We analyze the implications of the excess in the total electron plus positron flux and the positron fraction reported by the Fermi and PAMELA collaborations, respectively, for the scenario of decaying dark matter. We also discuss the constraints on this scenario from measurements of other cosmic ray species and the predictions for the diffuse gamma ray flux and the neutrino flux. In particular, we expect a sizable dipole-like anisotropy which may be observed in the near future by the Fermi-LAT.