WorldWideScience

Sample records for management system qms

  1. Effectiveness of Quality Management System (QMS) on Construction Projects

    OpenAIRE

    Behnam Neyestani

    2016-01-01

    Quality management system (QMS) provides generic guidance and requirements for establishing an appropriate quality management procedure, in order to lower cost, increase productivity, customer's satisfaction, and market share in the organizations since the last two-decade. In construction industry, it can assist the companies to achieve successfully their objectives, and ensure that all phases of construction project consistently meet client's requirements (need). The main aim of this article...

  2. Audit Monitoring For Quality Management System (QMS) In Malaysian Nuclear Agency

    International Nuclear Information System (INIS)

    Fazila Said; Nurul Huda Mudri; Nurul Zusyakirah Ishak

    2013-01-01

    Auditing for Quality Management System (QMS) is a tool that helps an organization to enhance the quality performance. The audit was performed to check, maintain and improve the QMS practice. It is a compulsory for an organization to undergo series of audit in order to maintain the certification based on standard. In Malaysian Nuclear Agency, audit activities is monitored by Research and Innovation Management Centre (RIMC) that manage and ensure the internal and external audit are performed effectively. This paper will discuss the audit status of the processes that implement MS ISO 9001 and laboratories that accredited with MS ISO/ IEC 17025 for consecutive five years from year 2008 till 2012. Among the factors that show the effectiveness of QMS are cumulative of non-conformance (nc) according to duration of certification, frequency of nc by clause and comparison of non conformance and conformance clause within five years. The improvement plans from RIMC are also have been discussed according to four factors; internal audit quality, organizational setting, management support and auditee attributes. (author)

  3. Development of a quality management system (QMS) for borehole investigations. (2) Evaluation of applicability of QMS methodology for the hydrochemical dataset

    International Nuclear Information System (INIS)

    Kunimaru, Takanori; Ota, Kunio; Amano, Kenji; Alexander, W. Russell

    2011-01-01

    An appropriate QMS, which is among the first tools required for repository site characterisation, will save on effort by reducing errors and the requirement to resample and reanalyse - but this can only be guaranteed by continuously assessing if the system is truly fit-for-purpose and amending it as necessary based on the practical experience of the end-users on-site. A QA audit of hydrochemical datasets for boreholes HDB-1-11 from Horonobe URL project by JAEA has been carried out by the application of a formal QA analysis which is based on the methodology previously employed for groundwaters during the recent site characterisation programme in Sweden. This methodology has been successfully applied to the groundwaters of the fractured crystalline rocks of the Fennoscandian Shield and has now been adapted and applied to some of the ground- and porewaters of the Horonobe URL area. This paper will present this system in the context of the Japanese national programme and elucidate improvements made during hands-on application of the borehole investigation QMS. Further improvements foreseen for the future will also be discussed with a view of removing inter-operator variability as much as is possible. Only then can confidence by placed in URL project or repository site hydrochemical datasets. (author)

  4. INTEGRATION OF MANAGEMENT SYSTEM QMS/EMS/OHSAS/FMS/LMS IN WATER SUPPLY ORGANIZATION

    Directory of Open Access Journals (Sweden)

    Slavko Arsovski

    2007-12-01

    Full Text Available Level of difficulties arises when goes up number of integrated management systems (IMS. In this paper are given model and empirical research which provide the details of an integrated management system with five component subsystems in area of water supply. Presented model addresses the issues of scope and carracterisctics based on process approach and is tested in water supply organization in Kragujevac, Serbia. Testing in the proposed model is accomplish through realization project of design and implementation of IMS in regional water supply organization in Kragujevac.

  5. Assessment of the Extent of Implementation of Quality Management System (QMS and Cost of Quality (COQ Concepts – A Case from a Developing Country

    Directory of Open Access Journals (Sweden)

    Sheheryar Qureshi

    2017-06-01

    Full Text Available In developed countries, the application of the quality management system (QMS is widely proven. However, in developing countries, like Pakistan, industries are not mature enough to understand and implement the system. The aim of this study is to examine the perception of quality, implementation of QMS and cost of quality (COQ program in value-added garment sector, which is one of the major subsectors of textile industry in Pakistan. The methodology of the study is a questionnaire survey. The findings suggest that the majority of the respondent firms have well implemented quality management (QM practices. Trend of results also depicts that most of the organizations wish to acquire ISO certification, which shows that the industrial processes are customer-centered thus striving to fulfil customer requirements. It can also be concluded that most of the organizations lack the COQ concept, its understanding and appropriate implementation.

  6. EXPLORING THE POTENTIAL OF INTEGRATION QUALITY ASSESSMENT SYSTEM IN CONSTRUCTION (QLASSIC WITH ISO 9001 QUALITY MANAGEMENT SYSTEM (QMS

    Directory of Open Access Journals (Sweden)

    Mukhtar Che Ali

    2014-03-01

    Full Text Available Quality has been identified as one of the fundamental needs of clients. As such construction projects that are able to be completed with distinctive quality will definitely enable to delight their customers. In this regard, Construction Industry Development Board (CIDB has introduced two quality related programs namely ISO 9001 DIY Scheme and QLASSIC. The later is essentially a quality performance assessment tool to evaluate the level of quality of a building construction work based on quality standards stipulated in CIS 7:2006. One of the key deliverables of QLASSIC is QLASSIC Score which denotes the level of quality of the assessed construction project. Potentially there is a strong correlation between QLASSIC and ISO 9001 QMS. However there is lack of knowledge in the industry in am algamating QLASSIC with ISO 9001QMS towards attaining high quality performance. Indeed it is noticed that not many studies have been undertaken in this area. Thus it warrants to undertake a study that deliberates on the relationship of practicing ISO 9001Q MS with the achievement of QLASSIC Score. Therefore among the key objectives of this research are generally to investigate the relationship between practicing ISO 9001 QMS principles with QLASSIC performance and to examine the expected business outcomes for ISO 9001 certified contractors that are able to sustain relatively high QLASSIC Score. Eventually it is postulated that the output of this research would enable to elevate the level of quality performance in the Malaysian construction industry.

  7. APPLICATION OF OLAP SYSTEM IN INFORMATION SUB-SYSTEM OF QMS INCOSISTENCY ANALYSIS

    Directory of Open Access Journals (Sweden)

    Alempije Veljovic

    2008-03-01

    Full Text Available Records of inconsistencies arise as a result of incompliance of certain requirements during the execution of the process for the quality management system (QMS functioning. In this study, the established connection between QMS and projected information sub-system for inconsistencies management is presented. The information model of inconsistencies management provides a possibility to analyse inconsistencies from the aspect of interactive analytical data processing (OLAPsystems on the basis of multi-dimensional tables (OLAPcubes created in MSSQL Server-Analysis Services programme.

  8. Internal Audits of QMS (COTS) -

    Data.gov (United States)

    Department of Transportation — This is an internal audit workflow application used to automate business processes that support the AVS Quality Management System (QMS) and several Flight Standards...

  9. Future Developments of QMS

    Directory of Open Access Journals (Sweden)

    Ph. D. Vidosav D. Majstorovic

    2009-12-01

    Full Text Available ISO technical committee ISO/TC 176 is responsible for the ISO 9000 family of standards for quality management and quality assurance. National delegations of 81 countries participate in its work, while another 21 (February 2009 countries have observer status. The ISO 9000 family of international quality management standards and guidelines (totally 18, has earned a global reputation as a basis for establishing effective and efficient quality management system.This paper show basic information about ISO 9001:2008, ISO 9004:2009 and future ISO TC 176 on advanced QMS model (probably ISO 9001:2015.

  10. Experience of the implementation of quality management system at the joint stock company 'Mashinostroitelny zavod', Electrostal

    International Nuclear Information System (INIS)

    Mezhuev, V.; Tsiboulia, V.; Kiruyshkin, A.; Tchirkov, V.

    2000-01-01

    The paper describes major steps of development and implementation of Quality Management System (QMS) in nuclear fuel fabrication at Joint Stock Company 'Mashinostroitelny zavod', Electrostal, Russian Federation. Special emphasis is paid to the estimation of QMS effectiveness, current impact of QMS implementation on nuclear fuel quality, sales market and directions for further QMS development. (author)

  11. Assessment of the Metrological Performance of Seismic Tables for a QMS Recognition

    International Nuclear Information System (INIS)

    Ribeiro, A Silva; Costa, A Campos; Candeias, P; Martins, L Lages; Martins, A C Freitas; Ferreira, A C; Sousa, J Alves e

    2016-01-01

    Seismic testing and analysis using large infrastructures, such as shaking tables and reaction walls, is performed worldwide requiring the use of complex instrumentation systems. To assure the accuracy of these systems, conformity assessment is needed to verify the compliance with standards and applications, and the Quality Management Systems (QMS) is being increasingly applied to domains where risk analysis is critical as a way to provide a formal recognition. This paper describes an approach to the assessment of the metrological performance of seismic shake tables as part of a QMS recognition, with the analysis of a case study of LNEC Seismic shake table. (paper)

  12. Assessment of the Metrological Performance of Seismic Tables for a QMS Recognition

    Science.gov (United States)

    Silva Ribeiro, A.; Campos Costa, A.; Candeias, P.; Sousa, J. Alves e.; Lages Martins, L.; Freitas Martins, A. C.; Ferreira, A. C.

    2016-11-01

    Seismic testing and analysis using large infrastructures, such as shaking tables and reaction walls, is performed worldwide requiring the use of complex instrumentation systems. To assure the accuracy of these systems, conformity assessment is needed to verify the compliance with standards and applications, and the Quality Management Systems (QMS) is being increasingly applied to domains where risk analysis is critical as a way to provide a formal recognition. This paper describes an approach to the assessment of the metrological performance of seismic shake tables as part of a QMS recognition, with the analysis of a case study of LNEC Seismic shake table.

  13. ISO 9001 quality management systems

    CERN Document Server

    Natarajan, Dhanasekharan

    2017-01-01

    This book explains the requirements of ISO 9001 for establishing quality management system (QMS) for an organization. The requirements are illustrated with examples from industries for understanding the requirements and preparing the documents of QMS with high clarity. Methods of integrating ISO 9001 requirements with enterprise resource planning (ERP) software are presented. The software integrated approach enables process owners to focus on their core tasks of achieving the planned outputs of processes and the software generates quality records automatically.

  14. The role of individual accountability in promoting quality management systems

    NARCIS (Netherlands)

    Turusbekova, N.; Broekhuis, Manda; Emans, B.J.M.; Molleman, E.

    2007-01-01

    Workers sometimes violate, more or less deliberately, Quality Management System ( QMS) procedures and rules, and two of the most essential causes of such violations are the attitude and motivation of the workers. The effectiveness of a QMS may therefore benefit from management tools aimed at

  15. TOP PRIORITI QMS PRINCIPLES FOR ACHIEVING BUSINESS EXCELLENCE

    Directory of Open Access Journals (Sweden)

    Aleksandar Vujović

    2010-06-01

    Full Text Available The main target of this paper is to select top priority principles of QMS for achieving business excellence. This could be done from the standpoint of significant of principles. That means that. organization should make more attention to this principles in the way for making excellent results. This paper has been developed as a tendency of researchers in the Center for quality-Faculty of mechanical engineering in Podgorica to establish a model for improvement of business processes performances based on quality management system through comparison with top organizational performances characterized by criteria i.e. particularities of the business excellence model. Correlation of principles of the quality management system with QMS principles has been established to that effect. Weight coefficients have been also determined for each principle individually. Thereby key principles were identified, namely priorities in terms of achieving business excellence i.e. areas (principles were given priorities, that is to say principles that play the biggest part in achieving business excellence.

  16. DETERMINATION OF QMS PRINCIPLE COEFFICIENTS OF SIGNIFICANCE IN ACHIEVING BUSINESS EXCELLENCE

    OpenAIRE

    Aleksandar Vujovic; Jelena Jovanovic; Zdravko Krivokapic; Milan Perovic; Mirko Sokovic

    2008-01-01

    This paper has been developed as a tendency of researchers in the Center for quality-Faculty of mechanical engineering in Podgorica to establish a model for improvement of business processes performances based on quality management system through comparison with top organizational performances characterized by criteria i.e. particularities of the business excellence model. Correlation of principles of the quality management system with QMS principles has been established to that effect. Weigh...

  17. Quality Management System Improves Effectiveness and Quality of Activities of Radiation Protection Regulatory Body in Lithuania

    International Nuclear Information System (INIS)

    Mastauskas, A.

    2016-01-01

    Processes of creation of quality management system (QMS) in regulatory body in radiation protection field – Radiation Protection Centre (RPC) and the benefit of this system to ensure the quality of the performance of functions are described. RPC QMS compliant with ISO 9001:2008 standard and in line with the requirements of the IAEA GSR- 3 document. It allowed achieving a new quality of works carried out by RPC. Because creation and introduction of the QMS is a continuous process, the QMS of RPC is continually renewed and new procedures are developed.

  18. Strengthening the regulatory system through the implementation and use of a quality management system

    Directory of Open Access Journals (Sweden)

    Reinhold Eisner

    2017-04-01

    Full Text Available ABSTRACT Quality management systems (QMS, based on ISO 9001 requirements, are applicable to government service organizations such as Health Canada’s Biologics and Genetic Therapies Directorate (BGTD. This communication presents the process that the BGTD followed since the early 2000s to implement a quality management system and describes how the regulatory system was improved as a result of this project. BGTD undertook the implementation of a quality management system based on ISO 9001 and containing aspects of ISO 17025 with the goal of strengthening the regulatory system through improvements in the people, processes, and services of the organization. We discuss the strategy used by BGTD to implement the QMS and the benefits that were realized from the various stages of implementation. The eight quality principals upon which the QMS standards of the ISO 9000 series are based were used by senior management as a framework to guide QMS implementation.

  19. Implementation of Quality Management System for Historical Building Conservation

    Directory of Open Access Journals (Sweden)

    Zahari N.F.

    2014-01-01

    Full Text Available The main objectives of this study are twofold. Firstly, to identify the implementation of ISO 9001 procedures being used as references for conservation works and the development of Quality Management System (QMS guidelines. Data were solicited from three (3 conservation areas. The analysis involved of descriptive approach and statistical methods. The findings revealed that QMS is not structurally established, implemented and enforced as part of conservation practice in Malaysia. From the findings, the authors hope to give clear perception to the reader on current preservation practice and the existence of QMS with reference to ISO 9001 for future conservation mechanism.

  20. Establishment of a Quality Management System Based on ISO 9001 Standard in a Public Service Fungal Culture Collection

    KAUST Repository

    Simoes, Marta; Dias, Nicolina; Santos, Cledir; Lima, Nelson

    2016-01-01

    to facilitate that process is to implement a Quality Management System (QMS) based on the ISO 9001 standard. Here, we report a detailed description of all the steps taken for the QMS implementation at the Portuguese CC of filamentous fungi: Micoteca da

  1. Portuguese food composition database quality management system.

    Science.gov (United States)

    Oliveira, L M; Castanheira, I P; Dantas, M A; Porto, A A; Calhau, M A

    2010-11-01

    The harmonisation of food composition databases (FCDB) has been a recognised need among users, producers and stakeholders of food composition data (FCD). To reach harmonisation of FCDBs among the national compiler partners, the European Food Information Resource (EuroFIR) Network of Excellence set up a series of guidelines and quality requirements, together with recommendations to implement quality management systems (QMS) in FCDBs. The Portuguese National Institute of Health (INSA) is the national FCDB compiler in Portugal and is also a EuroFIR partner. INSA's QMS complies with ISO/IEC (International Organization for Standardisation/International Electrotechnical Commission) 17025 requirements. The purpose of this work is to report on the strategy used and progress made for extending INSA's QMS to the Portuguese FCDB in alignment with EuroFIR guidelines. A stepwise approach was used to extend INSA's QMS to the Portuguese FCDB. The approach included selection of reference standards and guides and the collection of relevant quality documents directly or indirectly related to the compilation process; selection of the adequate quality requirements; assessment of adequacy and level of requirement implementation in the current INSA's QMS; implementation of the selected requirements; and EuroFIR's preassessment 'pilot' auditing. The strategy used to design and implement the extension of INSA's QMS to the Portuguese FCDB is reported in this paper. The QMS elements have been established by consensus. ISO/IEC 17025 management requirements (except 4.5) and 5.2 technical requirements, as well as all EuroFIR requirements (including technical guidelines, FCD compilation flowchart and standard operating procedures), have been selected for implementation. The results indicate that the quality management requirements of ISO/IEC 17025 in place in INSA fit the needs for document control, audits, contract review, non-conformity work and corrective actions, and users' (customers

  2. QMS CONCEPT ON THE BASE OF PROCESS APROACH

    Directory of Open Access Journals (Sweden)

    Zdravko Krivokapic

    2007-12-01

    Full Text Available For a long time, issue of Management for the Process network occupies attention of research teams consisted of scientist and their assistants from "Center for Quality" of the Mechanical Engineering in Podgorica. Research of Process approach commenced on issues of automation information systems implementation in process management, and they have become especially actual when ISO 9000:2000 standards appeared and QMS concept. This work analyzes possibilities for improvement of quality process through the process network or should we say through definition of efficient process architecture using modified BSP method and HIPO+P method. Using already published approaches of the TQM as well as our own research the relation matrix has been defined the matrix of goal structure of process structure of team structure and of quality process structure that shows that concepts of improvement and management of processes are hard to set apart and that any business process can be improved through by management of those who implement them, there for by the owners of process.

  3. Determinants of quality management systems implementation in hospitals.

    Science.gov (United States)

    Wardhani, Viera; Utarini, Adi; van Dijk, Jitse Pieter; Post, Doeke; Groothoff, Johan Willem

    2009-03-01

    To identify the problems and facilitating factors in the implementation of quality management system (QMS) in hospitals through a systematic review. A search strategy was performed on the Medline database for articles written in English published between 1992 and early 2006. Using the thesaurus terms 'Total Quality Management' and 'Quality Assurance Health Care', combined with the term 'hospital' and 'implement*', we identified 533 publications. The screening process was based on empirical articles describing organization-wide QMS implementation. Fourteen empirical articles fulfilled the inclusion criteria and were reviewed in this paper. An organization culture emphasizing standards and values associated with affiliation, teamwork and innovation, assumption of change and risk taking, play as the key success factor in QMS implementation. This culture needs to be supported by sufficient technical competence to apply a scientific problem-solving approach. A clear distribution of QMS function within the organizational structure is more important than establishing a formal quality structure. In addition to management leadership, physician involvement also plays an important role in implementing QMS. Six supporting and limiting factors determining QMS implementation are identified in this review. These are the organization culture, design, leadership for quality, physician involvement, quality structure and technical competence.

  4. Department of Defense Quality Management Systems and ISO 9000:2000

    National Research Council Canada - National Science Library

    Lucius, Tommie

    2002-01-01

    ...) to the Department of Defense (DoD) quality management system (QMS) in procurement. In particular, the researcher will examine the new standard and its utility for DoD procurement, focusing on changes from the previous ISO 9000 series...

  5. The evaluation of the introduction of a quality management system. A process-oriented case study in a large rehabilitation hospital

    NARCIS (Netherlands)

    van Harten, Willem H.; Casparie, Ton F.; Fisscher, O.A.M.

    2002-01-01

    Objectives: So far, there is limited proof concerning the effects of the introduction of quality management systems (QMS) on organisational level. This study concerns the introduction of a QMS in a large rehabilitation hospital. Methods: Using an observational framework, a process-analysis is

  6. Probabilistic pattern of risks in company’s Quality management system

    Directory of Open Access Journals (Sweden)

    Mager Vladimir

    2017-01-01

    Full Text Available One possible approach for calculation of probabilistic rate of risks in Quality management system (QMS, which is prescribed by requirements of International Standard ISO 9001:2015, is proposed in this article. Aspects of the theory of dependability and Markov techniques are used, which are applied for evaluation of probability of failures in complicated technical systems. Representation of QMS processes as a graph with controlled discrete Markov chains is suggested, which allows to evaluate a probability of customer requirements non-fulfillment as a function of an intensity of mistakes that bring to non-conformities in QMS.

  7. Information Support of the Higher Education Quality Management System

    Directory of Open Access Journals (Sweden)

    Murat K. Baymuldin

    2013-01-01

    Full Text Available The article deals with the quality management system (QMS of a university as a combination of organizational structure, procedures, processes and resources needed to implement quality policy with the help of quality planning, management, control and improvement, the need for automated information system of the university quality management system control

  8. Using Project Performance to Measure Effectiveness of Quality Management System Maintenance and Practices in Construction Industry

    OpenAIRE

    Tiong Kung Leong; Norhayati Zakuan; Muhamad Zameri Mat Saman; Mohd. Shoki Md. Ariff; Choy Soon Tan

    2014-01-01

    This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client sat...

  9. DETERMINATION OF QMS PRINCIPLE COEFFICIENTS OF SIGNIFICANCE IN ACHIEVING BUSINESS EXCELLENCE

    Directory of Open Access Journals (Sweden)

    Aleksandar Vujovic

    2008-03-01

    Full Text Available This paper has been developed as a tendency of researchers in the Center for quality-Faculty of mechanical engineering in Podgorica to establish a model for improvement of business processes performances based on quality management system through comparison with top organizational performances characterized by criteria i.e. particularities of the business excellence model. Correlation of principles of the quality management system with QMS principles has been established to that effect. Weight coefficients have been also determined for each principle individually. Thereby key principles were identified, namely priorities in terms of achieving business excellence i.e. areas (principles were given priorities, that is to say principles that play the biggest part in achieving business excellence. In that way, pre conditions were made to define preventive measures of a certain intensity depending on the weight coefficients, with a goal to improve performances of a certified and process-modulated quality management system in direction of achieving top organizational performances.

  10. Using Project Performance to Measure Effectiveness of Quality Management System Maintenance and Practices in Construction Industry

    Science.gov (United States)

    Leong, Tiong Kung; Ariff, Mohd. Shoki Md.

    2014-01-01

    This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings. PMID:24701182

  11. Using Project Performance to Measure Effectiveness of Quality Management System Maintenance and Practices in Construction Industry

    Directory of Open Access Journals (Sweden)

    Tiong Kung Leong

    2014-01-01

    Full Text Available This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings.

  12. Using project performance to measure effectiveness of quality management system maintenance and practices in construction industry.

    Science.gov (United States)

    Leong, Tiong Kung; Zakuan, Norhayati; Mat Saman, Muhamad Zameri; Ariff, Mohd Shoki Md; Tan, Choy Soon

    2014-01-01

    This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings.

  13. Quality Management System at the Nuclear Regulatory Authority of the Slovak Republic

    International Nuclear Information System (INIS)

    Husarcek, J.; Novak, S.

    2008-01-01

    The process-oriented quality management system (QMS) implemented at the Nuclear Regulatory Authority of the Slovak Republic (UJD SR) in compliance with the EN ISO 9001:2001 standard is described. The history of the establishment and development of the QMS is given. The main, managerial and supporting processes with respect to defined activities are specified, and a scheme of their interactions is presented. The contents of the Quality Manual content and the structure of the system documentation are briefly described. The responsibilities for the operation and improvements of the QMS are described along with the methods applied (internal and external audits, self-assessment - Common Assessment Framework (CAF)). Examples of established quality objectives and indicators for some processes are provided. A future development of the QMS is expected in accordance with the relevant ISO Standard and IAEA recommendations and based on evaluation of the effectiveness of the critical system. (orig.)

  14. 14 CFR 60.5 - Quality management system.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Quality management system. 60.5 Section 60... requirement of this chapter unless the sponsor has established and follows a quality management system (QMS...) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.5 Quality...

  15. The Department of Safeguards Quality Management System

    International Nuclear Information System (INIS)

    Konecni, S.

    2015-01-01

    The International Atomic Energy Agency (IAEA) Department of Safeguards quality management system (QMS) provides the framework for all activities that support the Agency's commitment to providing soundly-based safeguards conclusions regarding the peaceful use of nuclear material. The focus of the QMS is to enhance the effectiveness and efficiency of safeguards implementation through defined, documented processes, routine oversight and continual improvement initiatives. In accordance with QMS principles, the high-level business processes representing the Department's activities are defined in procedures, guidelines and policies that are maintained in the Safeguards Document Manager. These processes form the basis for Department operations for drawing safeguards conclusions regarding State's compliance with their safeguards obligations. Oversight is provided through internal quality audits. These audits are targeted at processes selected by Senior Management with a focus on procedure compliance as well as customer expectations. Best practices and areas for improvement are assessed through continual improvement. Noncompliance and conditions that are adverse to quality are identified and analyzed in the Condition Report System. Root cause analysis and the implementation actions to eliminate the cause reduce the chance of condition recurrence. Through continual process improvement, processes are measured and analyzed to reduce process and administration waste. The improved processes improve efficiency while providing the desired results. Within the scope of the QMS, these tools support the performance of Departmental processes so that Safeguards products achieve the intended purpose. This paper describes how the various elements of the Department's QMS support safeguards implementation. (author)

  16. KNOWLEDGE MANAGEMENT AND INTELLECTUAL CAPITAL MANAGEMENT COUPLED TO QUALITY MANAGEMENT SYSTEM LEAD TO BUSINESS SUCCESS

    Directory of Open Access Journals (Sweden)

    Stevan Živojinović

    2009-03-01

    Full Text Available From the vantage point of contemporary management paradigm shift and new knowledge-based economy, we underscore the importance of relations and support of quality management system - QMS (according to ISO 9001 standard for management of knowledge and intellectual capital. QMS implementation, documenting, application, maintenance and continuous improvement, as a catalyst of effective organization management, provides a foundation for effective knowledge management and intellectual capital enlargement, via knowledge, skills, management systems, procedures, information and product flow, culture, inovation, relations with customers and other stakeholders. Simultaneous implementation and dynamic interaction of these advanced management concepts intended to attain competitive advantage can result in synergic effects and improved performance. From the perspective of knowledge, as a central unifying notion, organizational behavior based on learning influences long-term business success, process effectiveness and customer satisfaction.

  17. Managerial attitude to the implementation of quality management systems in Lithuanian support treatment and nursing hospitals

    Directory of Open Access Journals (Sweden)

    Lydeka Zigmas

    2006-09-01

    Full Text Available Abstract Background The regulations of the Quality Management System (QMS implementation in health care organizations were approved by the Lithuanian Ministry of Health in 1998. Following the above regulations, general managers of health care organizations had to initiate the QMS implementation in hospitals. As no research on the QMS implementation has been carried out in Lithuanian support treatment and nursing hospitals since, the objective of this study is to assess its current stage from a managerial perspective. Methods A questionnaire survey of general managers of Lithuanian support treatment and nursing hospitals was carried out in the period of January through March 2005. Majority of the items included in the questionnaire were measured on a seven-point Likert scale. During the survey, a total of 72 questionnaires was distributed, out of which 58 filled-in ones were returned (response rate 80.6 per cent; standard sampling error 0.029 at 95 per cent level of confidence. Results Quality Management Systems were found operating in 39.7 per cent of support treatment and nursing hospitals and currently under implementation in 46.6 per cent of hospitals (13.7% still do not have it. The mean of the respondents' perceived QMS significance is 5.8 (on a seven-point scale. The most critical issues related to the QMS implementation include procedure development (5.5, lack of financial resources (5.4 and information (5.1, and development of work guidelines (4.6, while improved responsibility and power sharing (5.2, better service quality (5.1 and higher patient satisfaction (5.1 were perceived by the respondents as the key QMS benefits. The level of satisfaction with the QMS among the management of the surveyed hospitals is mediocre (3.6. However it was found to be higher among respondents who were more competent in quality management, were familiar with ISO 9000 standards, and had higher numbers of employees trained in quality management. Conclusion

  18. Quality management system in Nuclear Medicine

    International Nuclear Information System (INIS)

    Peña Tornet, Adela; Torres Aroche, Leonel A.

    2016-01-01

    Establishing Management Systems (QMS) in services Nuclear Medicine (NM) is a prerequisite for optimizing the efficacy and safety of diagnostic and therapeutic procedures of this specialty and increase steadily the quality of the services provide patients. Several international organizations such as the IAEA and scientific specialty societies (SNM, EBNM, etc) and national bodies stimulate and enhance their introduction; in our country is also a requirement of the National Nuclear Safety Centre (CNSN). Are presented in this paper, the main experiences of our country related to the implementation of QMS and developed tools for achieving this goal, such as: The QNUMED automated web environment for managing indicators and documentation format digital; b) The development of prototypes and models for the implementation of the documentation system; d) requirements applying QUANUM in conducting audits of quality management in local services including QUANUM T ool tool; and f) human resource development issues in Quality Management. (author)

  19. Quality management system in the CIEMAT Radiation Dosimetry Service.

    Science.gov (United States)

    Martín, R; Navarro, T; Romero, A M; López, M A

    2011-03-01

    This paper describes the activities realised by the CIEMAT Radiation Dosimetry Service (SDR) for the implementation of a quality management system (QMS) in order to achieve compliance with the requirements of ISO/IEC 17025 and to apply for the accreditation for testing measurements of radiation dose. SDR has decided the accreditation of the service as a whole and not for each of its component laboratories. This makes it necessary to design a QMS common to all, thus ensuring alignment and compliance with standard requirements, and simplifying routine works as possible.

  20. Determinants of quality management systems implementation in hospitals

    NARCIS (Netherlands)

    Wardhani, Viera; Utarini, Adi; van Dijk, Jitse Pieter; Post, Doeke; Groothoff, Johan Willem

    Objective: To identify the problems and facilitating factors in the implementation of quality management system (QMS) in hospitals through a systematic review. Method: A search strategy was pet-formed on the Medline database for articles written in English published between 1992 and early 2006.

  1. Implementing a Quality Management System in the Medical Microbiology Laboratory.

    Science.gov (United States)

    Carey, Roberta B; Bhattacharyya, Sanjib; Kehl, Sue C; Matukas, Larissa M; Pentella, Michael A; Salfinger, Max; Schuetz, Audrey N

    2018-07-01

    This document outlines a comprehensive practical approach to a laboratory quality management system (QMS) by describing how to operationalize the management and technical requirements described in the ISO 15189 international standard. It provides a crosswalk of the ISO requirements for quality and competence for medical laboratories to the 12 quality system essentials delineated by the Clinical and Laboratory Standards Institute. The quality principles are organized under three main categories: quality infrastructure, laboratory operations, and quality assurance and continual improvement. The roles and responsibilities to establish and sustain a QMS are outlined for microbiology laboratory staff, laboratory management personnel, and the institution's leadership. Examples and forms are included to assist in the real-world implementation of this system and to allow the adaptation of the system for each laboratory's unique environment. Errors and nonconforming events are acknowledged and embraced as an opportunity to improve the quality of the laboratory, a culture shift from blaming individuals. An effective QMS encourages "systems thinking" by providing a process to think globally of the effects of any type of change. Ultimately, a successful QMS is achieved when its principles are adopted as part of daily practice throughout the total testing process continuum. Copyright © 2018 American Society for Microbiology.

  2. An overview of Quality Management System implementation in a research laboratory

    Science.gov (United States)

    Molinéro-Demilly, Valérie; Charki, Abdérafi; Jeoffrion, Christine; Lyonnet, Barbara; O'Brien, Steve; Martin, Luc

    2018-02-01

    The aim of this paper is to show the advantages of implementing a Quality Management System (QMS) in a research laboratory in order to improve the management of risks specific to research programmes and to increase the reliability of results. This paper also presents experience gained from feedback following the implementation of the Quality process in a research laboratory at INRA, the French National Institute for Agronomic Research and details the various challenges encountered and solutions proposed to help achieve smoother adoption of a QMS process. The 7Ms (Management, Measurement, Manpower, Methods, Materials, Machinery, Mother-nature) methodology based on the Ishikawa `Fishbone' diagram is used to show the effectiveness of the actions considered by a QMS, which involve both the organization and the activities of the laboratory. Practical examples illustrate the benefits and improvements observed in the laboratory.

  3. Six Sigma Quality Management System and Design of Risk-based Statistical Quality Control.

    Science.gov (United States)

    Westgard, James O; Westgard, Sten A

    2017-03-01

    Six sigma concepts provide a quality management system (QMS) with many useful tools for managing quality in medical laboratories. This Six Sigma QMS is driven by the quality required for the intended use of a test. The most useful form for this quality requirement is the allowable total error. Calculation of a sigma-metric provides the best predictor of risk for an analytical examination process, as well as a design parameter for selecting the statistical quality control (SQC) procedure necessary to detect medically important errors. Simple point estimates of sigma at medical decision concentrations are sufficient for laboratory applications. Copyright © 2016 Elsevier Inc. All rights reserved.

  4. The quality management system at the European tritium handling experimental laboratory

    International Nuclear Information System (INIS)

    Dizadji, F.; Ferrario, L.

    1992-01-01

    The main limitations of conventional Quality Assurance (QA) are discussed with reference to the operational phase of a radio-chemical research laboratory. The paper suggests a broader approach utilizing a Quality Management System (QMS) which focuses on the operational efficiency of a R ampersand D organization in terms of reliability, reproducibility, cost effectiveness and safety. The management's role is presented with particular reference to the best fit of managerial style to the organization's mission, culture, personnel and surrounding environment. Qt. QMS policies and QA criteria are suggested for ETHEL to replace conventional QA requirements. Finally, guidelines for designing the ETHEL organizational structure are discussed

  5. [IMPLEMENTATION OF A QUALITY MANAGEMENT SYSTEM IN A NUTRITION UNIT ACCORDING TO ISO 9001:2008].

    Science.gov (United States)

    Velasco Gimeno, Cristina; Cuerda Compés, Cristina; Alonso Puerta, Alba; Frías Soriano, Laura; Camblor Álvarez, Miguel; Bretón Lesmes, Irene; Plá Mestre, Rosa; Izquierdo Membrilla, Isabel; García-Peris, Pilar

    2015-09-01

    the implementation of quality management systems (QMS) in the health sector has made great progress in recent years, remains a key tool for the management and improvement of services provides to patients. to describe the process of implementing a quality management system (QMS) according to the standard ISO 9001:2008 in a Nutrition Unit. the implementation began in October 2012. Nutrition Unit was supported by Hospital Preventive Medicine and Quality Management Service (PMQM). Initially training sessions on QMS and ISO standards for staff were held. Quality Committee (QC) was established with representation of the medical and nursing staff. Every week, meeting took place among members of the QC and PMQM to define processes, procedures and quality indicators. We carry on a 2 months follow-up of these documents after their validation. a total of 4 processes were identified and documented (Nutritional status assessment, Nutritional treatment, Monitoring of nutritional treatment and Planning and control of oral feeding) and 13 operating procedures in which all the activity of the Unit were described. The interactions among them were defined in the processes map. Each process has associated specific quality indicators for measuring the state of the QMS, and identifying opportunities for improvement. All the documents associated with requirements of ISO 9001:2008 were developed: quality policy, quality objectives, quality manual, documents and records control, internal audit, nonconformities and corrective and preventive actions. The unit was certified by AENOR in April 2013. the implementation of a QMS causes a reorganization of the activities of the Unit in order to meet customer's expectations. Documenting these activities ensures a better understanding of the organization, defines the responsibilities of all staff and brings a better management of time and resources. QMS also improves the internal communication and is a motivational element. Explore the satisfaction

  6. Performance management system in sale and distribution: A case of Serbian company

    Directory of Open Access Journals (Sweden)

    Aleksandar Jankulović

    2013-09-01

    Full Text Available Background: Performance management system (PMS is the process of quantifying action which leads to organizational efficiency, competitiveness and growth. Performance measurement is the vital element of quality management system (QMS. Innovative companies have a strong culture, clear sense of mission and purpose, a well thought out strategy and business philosophy of continuous improvement, driven by QMS. Implementation of QMS ISO9001 standards has encouraged many organizations to develop and implement performance management system. Statement of quality objectives and Measurement, analysis and improvement as a part of QMS which leads to continual improvement is a vital part of success of company. Therefore PMS influence on sale, distribution and logistics companies with a complex processes and great number of subjects in supply chain are of great importance for their success. Methods: In our research we analyse measures and measurement approaches and frameworks that exist in logistic management and based on that we present results from one SME from eastern European country. We use case study research and therefore we conduct interviews with managers, employees and QMS/PMS implementation staff in sale and distribution company. Results: The aim of this study was to estimate the value of various metrics of the evaluation of QMS implementation. The study was based on case study in one Serbian sale and distribution company specifically in measurement part and metrics that are essential for their business and to compare them with approaches existed in literature. We reveal some obstacles in collecting data for measurement and benchmarking in Serbian market. Different metrics for efficient management of company are implemented in this company based on sales results and customer satisfaction.  Conclusion:  The importance of the research is in the fact that implementation of QMS reveal the need for PMS implementation and therefore results in certain

  7. Quality management system in radiotherapy in the light of regulations applicable in Poland

    Science.gov (United States)

    2012-01-01

    The need to establish conditions for safe irradiation was noted in Poland back in 1986 in the Atomic Law, but for over 16 years no regulations regarding this aspect were passed. The radiological incident in Bialystok (Poland) in 2001 undeniably accelerated the implementation of new legal regulations. Nevertheless, in the absence of national guidelines until 2002, most health care institutions resorted to the quality management system (QMS) model proposed by the ISO norm 9001:2000. Eventually, practice proved the theory and the aforementioned model was also implemented into Polish acts of law defining basic requirements for QMS in radiotherapy. The aim of this work is to review current national regulations regarding QMS in radiotherapy, in particular those referring to standard procedures, the establishment of a commission for procedures and performance of external and internal clinical audits in oncological radiotherapy, as well as to present the process of their implementation into the practice of health care institutions. PMID:23788867

  8. The Impact of ISO Quality Management Systems on Primary and Secondary Schools in Spain

    Science.gov (United States)

    Arribas Díaz, Jorge Antonio; Martínez-Mediano, Catalina

    2018-01-01

    Purpose: The purpose of this study is to evaluate the application of quality management systems (QMS) based on international standards of quality in education (ISO 9001:2008) and ascertain the influence of this quality model on primary and secondary schools in Spain. Design/methodology/approach: The study was conducted in 26 publicly funded,…

  9. QUALITY MANAGEMENT IN TERMS OF STRENGTHENING THE "THREE LINES OF DEFENCE" IN RISK MANAGEMENT - PROCESS APPROACH

    OpenAIRE

    Radoica Luburic; Milan Perovic; Rajko Sekulovic

    2015-01-01

    The authors of the paper analyze risk management processes contained in the model considering its longstanding application in many European organisations. The paper also analyses quality management system (QMS) standards and risk management (RM) standards. It particularly addresses the process approach to QMS which, when coupled with active involvement of employees and constant improvements, makes this approach interesting as the topic of this paper. The analyses herein resulted in integratin...

  10. ISO 9001 and ISO 14001: An Integrated Quality Management System for an MTR Facility SAFARI-1 Research Reactor

    International Nuclear Information System (INIS)

    Du Bruyn, J.F.; Piani, C.S.B.

    2005-01-01

    The SAFARI-1 research reactor, owned and operated by the South African Nuclear Energy Corporation (Necsa), initially obtained ISO 9001 accreditation of its Quality, Health, Safety and Environmental (QHSE) management system via international affiliation from the South African Bureau of Standards (SABS) during 1998 and re-certification according to ISO 9001 (2000) in 2003. With ever-increasing demands on nuclear facilities to demonstrate conformance to environmental policies, SAFARI-1 has now developed an Environmental Management System (EMS) that is compliant with ISO 14001 (1996) and is fully integrated with the SAFARI-1 Quality Management System (QMS). The dynamic involvement of SAFARI-1 in commercial applications demanded that any transition of the original QMS to a fully incorporated QHSE system had to be done in a way that would ensure sustained delivery of a safe and reliable service with continuous quality. At the same time, the primary vision of operating a facility under an efficient financial management programme was essential. The criteria established by the original ISO 9001 compliant QMS were appraised against the additional requirements of ISO 14001 and a suitable superstructure derived for generation and implementation of an inclusive EMS. The transitional integration of this system was planned so as to produce a QMS suitable to quality, environmental and other management related issues for application to the unique function of a nuclear research reactor. (author)

  11. THE QUALITY MANAGEMENT SYSTEM AT THE UNIVERSITY. PROBLEMS IN IMPLEMENTING

    Directory of Open Access Journals (Sweden)

    L. I. Nazina

    2014-01-01

    Full Text Available Summary. Beginning of the XXI century marked the active integration of Russia and the world community, including entry into the world educational space. The international activities of the leading universities of the country depends on the level of cooperation with foreign countries in the field of scientific and educational activities. Today topical issue recognition of the quality of Russian education abroad. One way to confirm this is the certification of the quality management system of the university. As long-term, mostly foreign experience, achieving the required level of quality and continue to improve the most productive is accomplished by implementing a quality management system in accordance with ISO 9000. In the modern system of higher education a lot of attention paid to quality, to ensure the competitiveness of the institution in the education market by training qualified specialists. Implementation of the quality management system is to move the university to process management prepared in accordance with approved and enacted by the QMS documents. Workplaces should determine the duties, powers and responsibilities of each employee within the quality management system, develop and implement the job descriptions, staff verify documented procedures. Implementation of the certification must be accompanied by specific and persistent administration by management in conjunction with the training and retraining of all managers and employees involved in the work on the implementation of the QMS in the organization. This article describes the goals, objectives in the formation and implementation of QMS in higher education arising from this problem and barriers (information, methodological, psychological, multiple ways to address them.

  12. The tissue bank at the Instituto Nacional de Investigaciones Nucleares: ISO 9001:2000 certification of its quality management system.

    Science.gov (United States)

    Martínez-Pardo, María Esther; Mariano-Magaña, David

    2007-01-01

    Tissue banking is a complex operation concerned with the organisation and coordination of all the steps, that is, from donor selection up to storage and distribution of the final products for therapeutic, diagnostic, instruction and research purposes. An appropriate quality framework should be established in order to cover all the specific methodology as well as the general aspects of quality management, such as research and development, design, instruction and training, specific documentation, traceability, corrective action, client satisfaction, and the like. Such a framework can be obtained by developing a quality management system (QMS) in accordance with a suitable international standard: ISO 9001:2000. This paper presents the implementation process of the tissue bank QMS at the Instituto Nacional de Investigaciones Nucleares in Mexico. The objective of the paper is to share the experience gained by the tissue bank personnel [radiosterilised tissue bank (BTR)] at the Instituto Nacional de Investigaciones Nucleares (ININ, National Institute of Nuclear Research), during implementation of the ISO 9001:2000 certification process. At present, the quality management system (QMS) of ININ also complies with the Mexican standard NMX-CC-9001:2000. The scope of this QMS is Research, Development and Processing of Biological Tissues Sterilised by Gamma Radiation, among others.

  13. Role of a quality management system in improving patient safety - laboratory aspects.

    Science.gov (United States)

    Allen, Lynn C

    2013-09-01

    The aim of this study is to describe how implementation of a quality management system (QMS) based on ISO 15189 enhances patient safety. A literature review showed that several European hospitals implemented a QMS based on ISO 9001 and assessed the impact on patient safety. An Internet search showed that problems affecting patient safety have occurred in a number of laboratories across Canada. The requirements of a QMS based on ISO 15189 are outlined, and the impact of the implementation of each requirement on patient safety is summarized. The Quality Management Program - Laboratory Services in Ontario is briefly described, and the experience of Ontario laboratories with Ontario Laboratory Accreditation, based on ISO 15189, is outlined. Several hospitals that implemented ISO 9001 reported either a positive impact or no impact on patient safety. Patient safety problems in Canadian laboratories are described. Implementation of each requirement of the QMS can be seen to have a positive effect on patient safety. Average laboratory conformance on Ontario Laboratory Accreditation is very high, and laboratories must address and resolve any nonconformities. Other standards, practices, and quality requirements may also contribute to patient safety. Implementation of a QMS based on ISO 15189 provides a solid foundation for quality in the laboratory and enhances patient safety. It helps to prevent patient safety issues; when such issues do occur, effective processes are in place for investigation and resolution. Patient safety problems in Canadian laboratories might have been prevented had effective QMSs been in place. Ontario Laboratory Accreditation has had a positive impact on quality in Ontario laboratories. Copyright © 2013 The Canadian Society of Clinical Chemists. Published by Elsevier Inc. All rights reserved.

  14. Quality Assurance Strategy for Existing Homes: Final Quality Management Primer for High Performing Homes

    Energy Technology Data Exchange (ETDEWEB)

    Del Bianco, M.; Taggart, J.; Sikora, J.; Wood, A.

    2012-12-01

    This guide is designed to help Building America (BA) Teams understand quality management and its role in transitioning from conventional to high performance home building and remodeling. It explains what quality means, the value of quality management systems, the unique need for QMS when building high performing homes, and the first steps to a implementing a comprehensive QMS. This document provides a framework and context for BA teams when they encounter builders and remodelers.

  15. Quality Assurance Strategy for Existing Homes. Final Quality Management Primer for High Performing Homes

    Energy Technology Data Exchange (ETDEWEB)

    Del Bianco, M. [NAHB Research Center Industry Partnership, Upper Marlboro, MD (United States); Taggart, J. [NAHB Research Center Industry Partnership, Upper Marlboro, MD (United States); Sikora, J. [NAHB Research Center Industry Partnership, Upper Marlboro, MD (United States); Wood, A. [NAHB Research Center Industry Partnership, Upper Marlboro, MD (United States)

    2012-12-01

    This guide is designed to help Building America (BA) teams understand quality management and its role in transitioning from conventional to high performance home building and remodeling. It explains what quality means, the value of quality management systems, the unique need for QMS when building high performing homes, and the first steps to a implementing a comprehensive QMS. This document provides a framework and context for BA teams when they encounter builders and remodelers.

  16. SUPPORT OF QUALITY MANAGEMENT SYSTEM AND BALANCED SCORECARD IN THE INTEGRATION OF NORMATIVE, STRATEGIC AND OPERATIONAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Stevan Živojinović

    2012-12-01

    Full Text Available Taking into consideration the problems of strategy implementation, as well as problems of external adaptation and internal integration in the enterprise, through the prism of the application of advanced management concepts, primarily - the quality management system (QMS and the balanced scorecard (BSC, leads to the opportunity to increase the integration of organizational levels of decision making and management. Understanding the support of the QMS and BSC in relationship coordination - business strategy, organizational structure and culture, is reflected in the integration and process management dimensions: 1 the existence of a hierarchical order of the strategic actions (from vision and mission, to strategy and objectives, to key success factors and key performance indicators, 2 action of various coordination mechanisms, formalization and standardization of the organizational structure and process and 3 consistent understanding and values of members of the organization, which provides efficient control of behavior, coordination and implementation of policy and company goals. Implementation of concepts of QMS and BSC will provide greater compatibility and coherence of the normative, strategic and operational management, which will lead to more successful business, enterprise development and the satisfaction of all stakeholders.

  17. Devices for Evaluating Imaging Systems. Chapter 15

    Energy Technology Data Exchange (ETDEWEB)

    Demirkaya, O.; Al-Mazrou, R. [Department of Biomedical Physics, King Faisal Specialist Hospital and Research Centre, Riyadh (Saudi Arabia)

    2014-12-15

    A quality management system (QMS) has three main components: (a) Quality assurance (QA); (b) Quality improvement; (c) Quality control (QC). The aim of a QMS is to ensure that the deliverables meet the requirements set forth by the users. The deliverables can be, in general, all the services provided in a nuclear medicine department, and the diagnostic imaging services in particular. In this section, the primary focus is the diagnostic imaging equipment and images produced by them.

  18. Quality management system and accreditation of the in vivo monitoring laboratory at Karslruhe Institute of Technology.

    Science.gov (United States)

    Breustedt, B; Mohr, U; Biegard, N; Cordes, G

    2011-03-01

    The in vivo monitoring laboratory (IVM) at Karlsruhe Institute of Technology (KIT), with one whole body counter and three partial-body counters, is an approved lab for individual monitoring according to German regulation. These approved labs are required to prove their competencies by accreditation to ISO/IEC 17025:2005. In 2007 a quality management system (QMS), which was successfully audited and granted accreditation, was set up at the IVM. The system is based on the ISO 9001 certified QMS of the central safety department of the Research Centre Karlsruhe the IVM belonged to at that time. The system itself was set up to be flexible and could be adapted to the recent organisational changes (e.g. founding of KIT and an institute for radiation research) with only minor effort.

  19. Quality management of eLearning for medical education: current situation and outlook.

    Science.gov (United States)

    Abrusch, Jasmin; Marienhagen, Jörg; Böckers, Anja; Gerhardt-Szép, Susanne

    2015-01-01

    In 2008, the German Council of Science had advised universities to establish a quality management system (QMS) that conforms to international standards. The system was to be implemented within 5 years, i.e., until 2014 at the latest. The aim of the present study was to determine whether a QMS suitable for electronic learning (eLearning) domain of medical education to be used across Germany has meanwhile been identified. We approached all medical universities in Germany (n=35), using an anonymous questionnaire (8 domains, 50 items). Our results (response rate 46.3%) indicated very reluctant application of QMS in eLearning and a major information deficit at the various institutions. Authors conclude that under the limitations of this study there seems to be a considerable need to improve the current knowledge on QMS for eLearning, and that clear guidelines and standards for their implementation should be further defined.

  20. Implementation Of Quality Management System For Irradiation Processing Services

    Science.gov (United States)

    Lungu, Ion-Bogdan; Manea, Maria-Mihaela

    2015-07-01

    In today's market, due to an increasing competitiveness, quality management has set itself as an indispensable tool and a reference point for every business. It is ultimately focused on customer satisfaction which is a stringent factor for every business. Implementing and maintaining a QMS is a rather difficult, time consuming and expensive process which must be done with respect of many factors. The aim of this paper is to present a case study for implementing QMS ISO 9001 in a gamma irradiation treatment service provider. The research goals are the identification of key benefits, reasons, advantages, disadvantages, drawbacks etc for a successful QMS implementation and use. Finally, the expected results focus on creating a general framework for implementing an efficient QMS plan that can be easily adapted to other kind of services and markets.

  1. Implementation of the quality management system ISO CD2 9001-2000 in a radiology department

    International Nuclear Information System (INIS)

    Fleisch, M.; Hergan, K.; Oser, W.

    2000-01-01

    Quality assurance in health care, a relatively new discipline, has developed rapidly over the last years and is now required by law. The Quality Management System (QMS) ISO 9001 aims at the definition of requirements necessary in order to achieve perfect products and continuous quality improvement. Implementation of this QMS necessitates the analysis and written documentation of all working processes and modes of operation. Furthermore, potential improvement possibilities are defined to guarantee highly qualified, generally applicable and standardised procedures. Time-consuming data assessment is an instrument to enable disclosure and analysis of existing errors as well as to show possibilities of optimization, thus forming the basis for continuous improvement. The new ISO NORM 9001-2000 is process-orientated with an organisational structure strongly recommendable for service institutions and therefore also for a department of radiology. (orig.) [de

  2. Developing a customised approach for strengthening tuberculosis laboratory quality management systems toward accreditation

    Directory of Open Access Journals (Sweden)

    Heidi Albert

    2017-03-01

    Full Text Available Background: Quality-assured tuberculosis laboratory services are critical to achieve global and national goals for tuberculosis prevention and care. Implementation of a quality management system (QMS in laboratories leads to improved quality of diagnostic tests and better patient care. The Strengthening Laboratory Management Toward Accreditation (SLMTA programme has led to measurable improvements in the QMS of clinical laboratories. However, progress in tuberculosis laboratories has been slower, which may be attributed to the need for a structured tuberculosis-specific approach to implementing QMS. We describe the development and early implementation of the Strengthening Tuberculosis Laboratory Management Toward Accreditation (TB SLMTA programme. Development: The TB SLMTA curriculum was developed by customizing the SLMTA curriculum to include specific tools, job aids and supplementary materials specific to the tuberculosis laboratory. The TB SLMTA Harmonized Checklist was developed from the World Health Organisation Regional Office for Africa Stepwise Laboratory Quality Improvement Process Towards Accreditation checklist, and incorporated tuberculosis-specific requirements from the Global Laboratory Initiative Stepwise Process Towards Tuberculosis Laboratory Accreditation online tool. Implementation: Four regional training-of-trainers workshops have been conducted since 2013. The TB SLMTA programme has been rolled out in 37 tuberculosis laboratories in 10 countries using the Workshop approach in 32 laboratories in five countries and the Facility based approach in five tuberculosis laboratories in five countries. Conclusion: Lessons learnt from early implementation of TB SLMTA suggest that a structured training and mentoring programme can build a foundation towards further quality improvement in tuberculosis laboratories. Structured mentoring, and institutionalisation of QMS into country programmes, is needed to support tuberculosis laboratories

  3. Development of Quality Management System Under ISO 9001:2015 and Joint Inspection Group (JIG for Aviation Fuelling Service

    Directory of Open Access Journals (Sweden)

    Ruamchat Kanon

    2017-09-01

    Full Text Available The Joint Inspection Group (JIG standard for aviation fuel quality management assists in the operational process and maintenance of aviation fuel from its point of origin and through distribution systems to airports. Currently, problems arise as the JIG standard and quality management in aviation fuel are isolated and have independent procedures. Merging the JIG standards with ISO 9001:2015 can override original JIG’s philosophy by connecting all quality assessment, and management parties involved, throughout the supply chain. This integration can harmonize auditing tasks, focusing on risk/opportunity, and continue quality improvement focus. This paper proposes a development of quality management system (QMS under ISO 9001:2015 for aviation fuelling service in a systematic way. The content and critical success factors of ISO 9001:2015 and JIG standards were studied. The beneficial synergies, similarities, and logical linkages between both standards are identified. This QMS was developed in the largest petroleum company in Thailand and 60 selected experts were surveyed, with a response rate of 88.3%, for their agreement on integrated criteria. Two external quality auditors, who have ISO 9001 and JIG expertise, were interviewed to modify our initial proposed QMS. The final QMS was implemented in the into-plane fuelling services as the first phase of this implementation. Results of framework implementation are discussed in a case study. There are mutual benefits resulting from the integration of JIG and ISO 9001:2015 standards. This QMS provides a unified process for quality management practices, and enhances the effectiveness of risk evaluation as well as the opportunity for continued quality improvement. It facilitates the identification of ISO 9001:2015 requirements and establishes relationships between the roles of JIG standard and the clauses of ISO 9001:2015. The first experience from five airports as the pilot study of proposed QMS

  4. Quality management system of a university cardiac surgery department according to DIN EN ISO 9001 : 2000.

    Science.gov (United States)

    Beholz, S; Koch, C; Konertz, W

    2003-06-01

    A quality management system (QMS) will improve quality in health care units. This report describes the introduction of a QMS according to ISO 9001:2000 in a university cardiovascular surgery department. First, a thorough analysis of all processes of patient treatment and clinical research was obtained. Multiple interfaces were defined to different departments as well as to administration units. We evaluated and optimized all necessary resources, evaluating customer satisfaction using patients' and referring physicians' surveys. We started quality rounds including surgeons, nurses and technicians. Based on this preparation, we redefined and explained all processes including their responsibilities and necessary resources in the quality manual. After a process of 18 months, an independent, accredited organization recommended that our QMS be given certification according to ISO 9001:2000. Certification of a university cardiovascular surgery department according to ISO 9001:2000 is possible, and may represent the first step towards total quality management (TQM). In complex health care units, certification of separate departments may help generate a consciousness of quality on the way to TQM.

  5. Quality management system in hospital radiopharmacy laboratory

    International Nuclear Information System (INIS)

    Poch, Carolina; Rabiller, Graciela; Basualdo, Daniel A.; El Tamer, Elias A.

    2009-01-01

    Objective: 1) To determine the necessary conditions for increasing the complexity of the Radiopharmacy Laboratory and reach an operational level defined by the IAEA as 3a (Operational Guidance on Hospital Radiopharmacy). Our aim is that, within a framework of quality, last generation radiopharmaceuticals can be used, by sophisticated techniques such as labeling with bifunctional chelating agents, like HYNIC; 2) Consequently, we decided to implement a Quality Management System (QMS) in the field of Hospital Radiopharmacy in order to guarantee the safe and effective preparation and handling of radiopharmaceuticals for the diagnosis of patients, based on recommendations of the IAEA. Procedure For the implementation of the QMS, the sector of Radiopharmacy was capacitated in the application of ISO 9001. In a first stage it had begun with the formulation of the main documents and their enumeration. According to the recommendations of the IAEA Operational Guide, this year we proceeded to the optimization of the documents produced in the first stage and formulation of new documents essential to the improvement of work in the Radiopharmacy Laboratory. Results: Corrections were made to the performed procedures, and new ones were composed such as: Reception of raw materials, Control dose calibrator (Activity meter), General procedure of dosage, Procedure for decontamination, for Using the bio safety cabinet, for Cleaning the hot laboratory, etc. The Quality Controls were added to each of the Work Instructions of radiopharmaceuticals to be undertaken and how and when to carry out, with their respective references. Records were modified and new ones incorporated, in order to ensure traceability of the results before and after injection. Finally, the require documentation has been completed with the addition of the Staff Training Plan, and other records such as Nonconformance and Corrective and Preventive Actions. Conclusion: With the application of a QMS correctly implemented

  6. Influence of integrated quality management system on processing management in management and production staff’s opinion in Strauss Cafe Poland Ltd Company

    Directory of Open Access Journals (Sweden)

    Justyna Górna

    2009-01-01

    Full Text Available In the article are presented the results of the research determining the influence of the integrated quality management system on management process in the assessment of management and regular employees of Strauss Cafe Poland Ltd. According to the ISO 9001 requirements in order to effectively manage the organisation, should identify operations. The activities requiring resources and managed in order to enable the transformation of inflow into outflow should be evaluated as a process. The analysis of the gathered data shows the essential influence of the systems (QMS and HACCP on the management process in the company. The management staff emphasized the significant influence of the quality management system whereas production staff of HACCP system. Both of these groups of employees in the survey shows the beurocracy as a negative result of these systems, while positive results are improvement of image of the company and increase of both products and services quality.

  7. Horizon Dam design, construction, and quality management

    Energy Technology Data Exchange (ETDEWEB)

    Patrick, B. [EBA Engineering Consultants Ltd., Nanaimo, BC (Canada); Sisson, R. [Canadian Natural Resources Ltd., Fort McMurray, AB (Canada)

    2010-07-01

    This paper discussed the design and construction of the Tar River Diversion Dam and the quality management system (QMS) used during construction. The project was unusual in that the company constructed the project using its own workforce, without contractors, under challenging schedule and site conditions. The topography, geology and geotechnical aspects of the site were discussed along with the embankment design, seepage control measures and construction execution. The QMS was designed to fit the needs of the unique construction execution strategy and meet safety, reliability, performance, and operation requirements, comply with all regulations and approval conditions, and identify and communicate risk to the appropriate entity. Specifications and construction procedures had to be modified to accommodate equipment operators trained with the skills and techniques of mine operations, not those associated with conventional civil construction projects. Foundation movement identified during construction required mid-build design changes, construction rescheduling, and additional deformation analyses to determine long-term stability. The QMS allowed changes in the understanding of site conditions to be quickly addressed and risks to be identified and cost-effectively mitigated. Design consultants were used to modify designs and appropriately identify and mitigate risks. The approach to embankment construction was successful because the QMS included processes for change management, issue resolution, and risk-benefit assessment, and because experienced personnel had a regular presence on the construction site and worked collaboratively. The effective QMS was deemed to be integral to the success of the construction project. 1 tab., 7 figs.

  8. [Implementation of the quality management system ISO/CD2 9001-2000 in a radiology institute].

    Science.gov (United States)

    Fleisch, M; Hergan, K; Oser, W

    2000-02-01

    Quality assurance in health care, a relatively new discipline, has developed rapidly over the last years and is now required by law. The Quality Management System (QMS) ISO 9001 aims at the definition of requirements necessary in order to achieve perfect products and continuous quality improvement. Implementation of this QMS necessitates the analysis and written documentation of all working processes and modes of operation. Furthermore, potential improvement possibilities are defined to guarantee highly qualified, generally applicable and standardised procedures. Time-consuming data assessment is an instrument to enable disclosure and analysis of existing errors as well as to show possibilities of optimization, thus forming the basis for continuous improvement. The new ISO NORM 9001-2000 is process-orientated with an organisational structure strongly recommendable for service institutions and therefore also for a department of radiology.

  9. Quality management system of Saraykoy Nuclear Research and Training center

    International Nuclear Information System (INIS)

    Gurellier, R.; Akchay, S.; Zararsiz, S.

    2014-01-01

    Full text : Technical competence and national/international acceptance of independency of laboratories is ensured by going through accreditations. It provides decreasing the risk of a slowdown in international trade due to unnecessary repetition of testing and analyses. It also eliminates the cost of additional experiments and analyses. Saraykoy Nuclear Research and Training Center (SANAEM) has performed intensive studies to establish an effective and well-functioning QMS (Quality Management System) by full accordance with the requirements of ISO/IEC 17025, since the begining of 2006. Laboratories, especially serving to public health studies and important trade duties require urgent accreditation. In this regard, SANAEM has established a quality management system and performed accreditation studies

  10. Improvement in cost-effectiveness and customer satisfaction by a quality management system according to EN ISO 9001:2000.

    Science.gov (United States)

    Beholz, Sven; Konertz, Wolfgang

    2005-12-01

    The implementation of a quality management system (QMS) according to EN ISO 9001:2000 has proven to be possible for cardiac surgery departments. However, it remains unclear if a QMS can help to improve quality as indicated by cost-effectiveness and customer satisfaction. To control costs for medical goods and laboratory investigations an internal control system for the allocation of resources was implemented. Laboratory costs and medical goods per open heart procedure were investigated in the years 2000 to 2003. In terms of customer satisfaction, repeated questionnaire-based evaluation of referring physicians was obtained from 2001 to 2003 and the influence of repeated interventions on various aspects of communications was investigated. Costs of medical goods could be reduced by 6.1%, and for laboratory investigations by 35% per operation. Additionally, customer satisfaction could be increased efficiently with respect to accessibility and postoperative communication. By the introduction of a process based QMS, efficient control of the costs of medical goods and laboratory investigations could be achieved. Once a year repeat evaluation of satisfaction of advising physicians has proven to be a valuable tool in the process of continuous improvement.

  11. Implementing of Quality management system (ISO 9000) in Radiotherapic Oncologycal Service

    International Nuclear Information System (INIS)

    Quarneti, A.; Castaño, A.; De Rosa, A.; Pintado, D.; Luongo Gardi, A.; Dalla Rosa, M.; Guerrero, L.; Luongo, M.; Luongo Céspedes, A.; Marchese, E.; Torres, M.; Di Mauro, J.; Payse, M.; Lorenzo, M.; Cortés, A.; Battagliotti, R.; Satragno, N.; García, I.; Gonsalves, D.; Gonzalez, J.; Ricagni, L.; Benausse, M.; Dama Volunt; Ferreiro, M.

    2004-01-01

    Objective: To show the progress and difficulties in the process of implementing a quality management system(QMS) according to the technical standard UNIT-ISO 9001-2000. Material and methods: The system is being implemented in Oncology Radiation of Dpt. Of Clinical Oncology, Hospital de Clínicas, Montevideo, and certification thereof shall be made by the Uruguayan Institute of Technical Standards (UNIT). The working group consists of: medical teachers, post-graduate, radiotherapy technicians,physical assistant, nurse, secretary, general service and pink ladies,besides teachers and interns UNIT. A systems approach to quality management in stages is applied and focused on the 8 quality principles: The commitment of senior management who drafted the quality policy was established. A committee and a coordinator of quality, service three doctors appointed are concurring specialist courses in quality management in health institutions dictated by UNIT. Patient surveys, officers and staff awareness talks were conducted. It is developing the mission, vision, objectives of quality and Quality Manual. Key processes, support and work procedures were determined. Presented some obstacles, mainly resistance to change. Conclusions: The implementation of a QMS is a valuable tool that tends to continuous quality improvement, increase patient satisfaction and service members, the performance of the organization and its processes, but is difficult due to instrumentation resistance to the changes observed in our service

  12. Das Qualitätsmanagementsystem für die Lehre an der Medizinischen Fakultät Carl Gustav Carus der Technischen Universität Dresden [Quality Management System of Education at Dresden Faculty of Medicine

    Directory of Open Access Journals (Sweden)

    Tiebel, Margret

    2006-11-01

    Full Text Available [english] Within two years the Faculty of Medicine Dresden introduced a quality management system (QMS for educational processes. The system underwent a certificational procedure and was certified according to DIN EN ISO 9001:2000. The QMS is based on a manual describing all educational processes. It serves visualization of these processes, identification of links between them and a clear definition of responsibilities. All involved employees of Faculty of Medicine can use the manual to optimize and improve the educational system. Leadership-, core- and supporting processes are described. Procedure instructions and further applicable documents are included. The manual is accessible via Intranet to all employees and "clients" of the Faculty of Medicine. The QMS is a leadership instrument. It relies on the vision of the Dresden Faculty of Medicine which defines short and long term goals and strategies to reach them. Certification procedure was completed with handing over of the certificate to the dean. It is valid for three years and the Faculty of Medicine will be under yearly supervision of certification agency. [german] Nach zweijähriger Einführungszeit führte die Medizinische Fakultät Dresden als erste medizinische Fakultät Deutschlands ein Qualitätsmanagementsystem (QMS für die Lehre ein und ließ es nach der DIN EN ISO 9001:2000 Norm zertifizieren. Das QMS beruht auf einem Handbuch, welches die wesentlichsten mit der Lehre verbundenen Prozesse beschreibt. Es dient der klaren Prozessvisualisierung, Identifikation der Vernetzungen zwischen den Abläufen und einer ebenso klaren Definition der Verantwortlichkeiten mit Verbindlichkeitscharakter. Es ist eine Handlungsanleitung, auf die alle in die Prozesse der Ausbildung involvierten Kollegen Zugriff haben, mit dem Ziel, alle sich aufzeichnenden Möglichkeiten zur Optimierung zu nutzen und eine Verbesserung des Gesamtsystems kontinuierlich voranzutreiben. Beschrieben werden F

  13. Implementation of quality management systems and progress towards accreditation of National Tuberculosis Reference Laboratories in Africa

    Directory of Open Access Journals (Sweden)

    Heidi Albert

    2017-03-01

    Full Text Available Background: Laboratory services are essential at all stages of the tuberculosis care cascade, from diagnosis and drug resistance testing to monitoring response to treatment. Enabling access to quality services is a challenge in low-resource settings. Implementation of a strong quality management system (QMS and laboratory accreditation are key to improving patient care. Objectives: The study objective was to determine the status of QMS implementation and progress towards accreditation of National Tuberculosis Reference Laboratories (NTRLs in the African Region. Method: An online questionnaire was administered to NTRL managers in 47 World Health Organization Regional Office for Africa member states in the region, between February and April 2015, regarding the knowledge of QMS tools and progress toward implementation to inform strategies for tuberculosis diagnostic services strengthening in the region. Results: A total of 21 laboratories (43.0% had received SLMTA/TB-SLMTA training, of which 10 had also used the Global Laboratory Initiative accreditation tool. However, only 36.7% of NTRLs had received a laboratory audit, a first step in quality improvement. Most NTRLs participated in acid-fast bacilli microscopy external quality assurance (95.8%, although external quality assurance for other techniques was lower (60.4% for first-line drug susceptibility testing, 25.0% for second-line drug susceptibility testing, and 22.9% for molecular testing. Barriers to accreditation included lack of training and accreditation programmes. Only 28.6%of NTRLs had developed strategic plans and budgets which included accreditation. Conclusion: Good foundations are in place on the continent from which to scale up accreditation efforts. Laboratory audits should be conducted as a first step in developing quality improvement action plans. Political commitment and strong leadership are needed to drive accreditation efforts; advocacy will require clear evidence of patient

  14. Quality Management in Schools: Analysis of Mediating Factors

    Science.gov (United States)

    Díez, Fernando; Iraurgi, Ioseba; Sanchez, Aurelio Villa

    2018-01-01

    The objective of this study is to contribute to Quality Management Systems (QMS) and their impact on schools in the Basque Country, Spain. Specifically, it analyses two models: the EFQM Excellence Model, which originated in the business world, and the Integrated Quality Project (IQP) Model, which has a humanistic focus and arose from an…

  15. Review of Special Standards in Quality Management Systems Audits in Automotive Production

    Science.gov (United States)

    Šurinová, Yulia

    2013-12-01

    Quality management systems (QMS) in automotive industry generally have several differences in comparison with other industrial branches. Different customers have their own specific requirements, including requirements for quality audits. Audits are one of the coretools of quality management to make the PDCA (Plan - Do - Check - Act) cycle work. As a matter of fact, compliance with ISO/TS 16949:2009 requirements is a condition for supplying the automotive industry. However, there are some standards which co-exist together with the ISO 9001 based management systems and technical specification for QMS in automotive ISO/TS16949. Which are those specific standards in automotive industry and what standard to use and why - those are the questions to be answered in this paper. The aim of the paper is to review what standards are used for audits implementation in automotive industry in the Slovak Republic, and why the organizations keep following those "extra" standards even if certification for ISO/TS 16949 is required by all the car makers. The paper is structured as follows: after short introduction to the topic and related terms, presented is our methodology. . In the third section, the achieved results are discussed. And finally, the principal findings of the paper, limitations and conclusions are presented.

  16. Quality management in radiation protection

    International Nuclear Information System (INIS)

    Baehrle, H.G.

    1997-01-01

    Quality Management in Radiation Protection Quality management (QM) in the field of Radiation Protection was discussed in a previous issue (2/97) using the example of QMS at the Paul Scherrer Institut (PSI). The present article describes the major features involved in the establishment of a functional QMS. Establishment of the QMS lead to a deeper understanding of administrative and operational aspects of the working methods involved. (orig.) [de

  17. Development and validation of an analytical method for the determination of lead isotopic composition using ICP-QMS

    OpenAIRE

    Rodríguez-Salazar, M. T.; Morton Bermea, O.; Hernández-Álvarez, E.; García-Arreola, M. E.; Ortuño-Arzate, M. T.

    2010-01-01

    This work reports a method for the precise and accurate determination of Pb isotope composition in soils and geological matrices by ICP-QMS. Three reference materials (AGV-2, SRM 2709 and JSO-1) were repeatedly measured, using ICP-QMS instruments in order to assess the quality of this analytical procedure. Mass discrimination was evaluated for Pb/Pb with Pb isotope reference material NIST SRM 981, and the correction applied to the above mentioned reference materials to achieve good accuracy o...

  18. The quality management system: an element for the competitiveness and sustainability of agricultural production in Colombia

    Directory of Open Access Journals (Sweden)

    Jorge Armando Fonseca C.

    2011-05-01

    Full Text Available Under the conditions of the increasing globalization of markets, changing consumer habits, frequent outbreaks of foodborne illnesses (FBI, social organizations and governments seeking production and food supply include the assurance of safeness in all links in the chain. One way to achieve it, is to implement a Quality Management System (QMS for certification in agricultural production units, the process addresses the farm give the perspective of general systems theory, shaped by production subsystems and support; them develop both technical and management activities that seek to streamline processes while maintaining standards of sustainability and social responsibility to achieve food production with previously established quality criteria. the process of developing and implementing the QMS requires the construction and operation of support documents and manuals on issues of organization, and organization of producers, which are structured to meet the requirements of a standard, protocol or code of conduct; their compliance is verified through inspections that could lead to the granting of certification or seal of product quality or service, the process can be developed individually by a producer or a producer organization.

  19. Implementation of quality management for clinical bacteriology in low-resource settings.

    Science.gov (United States)

    Barbé, B; Yansouni, C P; Affolabi, D; Jacobs, J

    2017-07-01

    The declining trend of malaria and the recent prioritization of containment of antimicrobial resistance have created a momentum to implement clinical bacteriology in low-resource settings. Successful implementation relies on guidance by a quality management system (QMS). Over the past decade international initiatives were launched towards implementation of QMS in HIV/AIDS, tuberculosis and malaria. To describe the progress towards accreditation of medical laboratories and to identify the challenges and best practices for implementation of QMS in clinical bacteriology in low-resource settings. Published literature, online reports and websites related to the implementation of laboratory QMS, accreditation of medical laboratories and initiatives for containment of antimicrobial resistance. Apart from the limitations of infrastructure, equipment, consumables and staff, QMS are challenged with the complexity of clinical bacteriology and the healthcare context in low-resource settings (small-scale laboratories, attitudes and perception of staff, absence of laboratory information systems). Likewise, most international initiatives addressing laboratory health strengthening have focused on public health and outbreak management rather than on hospital based patient care. Best practices to implement quality-assured clinical bacteriology in low-resource settings include alignment with national regulations and public health reference laboratories, participating in external quality assurance programmes, support from the hospital's management, starting with attainable projects, conducting error review and daily bench-side supervision, looking for locally adapted solutions, stimulating ownership and extending existing training programmes to clinical bacteriology. The implementation of QMS in clinical bacteriology in hospital settings will ultimately boost a culture of quality to all sectors of healthcare in low-resource settings. Copyright © 2017 The Authors. Published by

  20. The implementation of quality management system in the National Center for Nuclear Safety of the Republic Cuba

    International Nuclear Information System (INIS)

    Marrero Garcia, M.; Sanabria Molina, I.

    2010-01-01

    Since early 1992, the CNSN has been working on improving its key processes related to safe and peaceful use of nuclear energy in order to provide customers and stakeholders with confidence, which is, at the same time, one of the purposes of the International Atomic Energy Agency concerning these issues. The effectiveness of regulatory activity can be determined from the application of appropriate management systems to ensure strictly assigned functions. In the international practice promoted by the International Organization for Standardization, management systems (QMS) are the most widely used for these purposes. They are generally applicable to all organizations and there are certification programs and multilateral recognition focused on commercial exchange and otherwise such as traceability, testing, etc. For the purposes of a regulatory authority, the application of these modern management systems contributes to the transparency of its operation and the consistent application of its policies. Quality management in the regulatory authority relates all levels of human resources and management. This can be understood as necessary and documented relationship with the radiation protection infrastructure, regulators, the public and employees. In this paper, we present some considerations on this subject concerning both the design stage and the implementation and maintenance of the QMS, from the experience gained in the CNSN. (author)

  1. [Development and Current Status of Quality Management Systems for Specimen Examination].

    Science.gov (United States)

    Kanemura, Shigeru

    2015-07-01

    ISO 15189:2003 was published as an International Standard in 2003 by Technical Committee ISO/TC212 of the International Organization for Standardization (ISO). This international standard based on ISO 9001 specifies requirements for competence and quality that are specific to medical laboratories. With the publication of this standard, we will have to markedly change our concept. We have to adopt methods to manage the causes of errors in measurement processes rather than methods to manage only the results of measurements. The new concept of the Quality Management System (QMS) which manages the result of measurements is summarized. With the publication of ISO 15189, the definition of the quality assurance of examination results became clearer and stricter. This report describes the contents of ISO 15189 and the method of enforcing it.

  2. Environmental Management System

    Science.gov (United States)

    Goals Recycling Green Purchasing Pollution Prevention Reusing Water Resources Environmental Management Stewardship » Environmental Protection » Environmental Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the

  3. Improving Naval Aviation Maintenance Quality Management Processes at the Organizational Maintenance Level: The Influences of the International Standards Organization (ISO) 9000 Quality Management System on the Naval Aviation Maintenance Program (NAMP)

    National Research Council Canada - National Science Library

    Couch, Christopher

    1999-01-01

    ... to make them consistent with the ISO 9000 QMS. The NAMP is Naval aviation's overall guiding document that outlines command, administrative, and management relationships, and assigns maintenance policy and procedure responsibilities...

  4. Quality management system

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Mu Sung

    2009-08-15

    This book deals with ISO9001 quality management system which includes summary of this system such as classification of quality, principle of quality management, and definition, requirement and procedure of quality management system, introduction of ISO9001 system like model of ISO9001 quality management system, ISO certificate system, structure of ISO9001 standard, requirement of ISO9001 quality management system, process approach and documentation of system, propel cases of ISO9001 quality management system.

  5. Quality management system

    International Nuclear Information System (INIS)

    Lee, Mu Sung

    2009-08-01

    This book deals with ISO9001 quality management system which includes summary of this system such as classification of quality, principle of quality management, and definition, requirement and procedure of quality management system, introduction of ISO9001 system like model of ISO9001 quality management system, ISO certificate system, structure of ISO9001 standard, requirement of ISO9001 quality management system, process approach and documentation of system, propel cases of ISO9001 quality management system.

  6. Implementation of a management system in accordance with IAEA GS-R-3 Standard. A gap analysis

    International Nuclear Information System (INIS)

    Dicianu, I.; Oprea, M.

    2009-01-01

    Full text: The design and implementation of an Integrated Management System at SNN SA Headquarters become necessary as the CNCAN norms are already under revision to comply with the IAEA GS-R-3 standard. The purpose of this analysis is to draft a project for the transition from a Quality Management System (QMS) to an Integrated Management System (IMS) complying with GS-R-3 requirements. Four steps were identified for developing this project: STEP1 - To justify the necessity of the IMS implementation to meet the SNN SA Headquarters Top Management commitments. The requirements for implementing an IMS are analyzed and a comprehensive document is issued to (and maybe discussed with) SNN General Director in order to obtain the top management adherence/commitment to the project implementation. The document will show the strong and the weak points which should be considered in developing the project. The references for the project are: - IAEA Safety Standard GS-R-3 'The Management System for Facilities and Activities'; - ISO - 1400/2004 Standard 'Environmental Management System Requirements'; - OHSAS 18001/2007 Standard 'Occupational Health and Safety Management Systems. Requirements'; There are also considered: - IAEA Safety Guide GS-G-3.1 'Application of the Management System for Facilities and Activities'; - IAEA Draft Safety Guide DS-349 'Application of the Management System for Nuclear Facilities; There will be considered: Workshop 2 Bookmarks (F5) 2 - CNCAN Norms (as they will be revised); STEP2 - The performance of a comparative analysis of the requirements of GS-R-3, ISO 14001 and OHSAS 18001 versus the provisions of the QMS already implemented in SNN. This analysis is shown as a comparative table; STEP3 - Identification of the IMS processes. An overall analysis of the current processes described in the SNN QMS Manual is performed and based on this. There are identified the additional processes that have to be documented for the proper implementation of an IMS

  7. MEASUREMENT OF QUALITY MANAGEMENT SYSTEM PERFORMANCE IN MEAT PROCESSING

    Directory of Open Access Journals (Sweden)

    Elena S. Voloshina

    2017-01-01

    Full Text Available Modern methods aimed to ensure the quality of foods require to implement and certify quality management systems in processing plants. In this case, to measure the effectiveness of existing QMS is often a very difficult task for the leadership due to the fragmentation of the measured metrics, or even lack thereof. This points to the relevance of the conducted research.The criteria for effectiveness assessment of the production process of meat processing plants with the use of scaling methods and Shewhart control charts are presented in the article. The authors developed and presented the formulae for the calculation of single indicators used for the further comprehensive assessment. The algorithm of statistical evaluation of the process controllability, which allows in an accessible form to estimate the statistical control of production processes and to organize statistical quality control in the development of quality management systems, is presented The proposed procedure is based on a process approach, the essence of which is the application of the Deming cycle: “Plan — Do — Check — Act”, which makes it easy to integrate it into any existing quality management system.

  8. Bridge Management Systems

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    In this paper bridge management systems are discussed with special emphasis on management systems for reinforced concrete bridges. Management systems for prestressed concrete bridges, steel bridges, or composite bridges can be developed in a similar way....

  9. Implementation Of ISO 9000 Quality Management System Within The Manufacturing And Service Industry Of Ivory Coast

    Directory of Open Access Journals (Sweden)

    Borget Alfred Anoye

    2015-08-01

    Full Text Available Abstract The objective of this paper was to present the factors that impede the implementation of ISO 9000 QMS within the manufacturing and service Industry of Ivory Coast. It wasnt the intention of the author to provide detailed strategies for the readers to implement ISO 9000. It was an effort to present the relationship if any between the lack of ISO 9000 adoption and the perception of Ivoirians business organization leaders. For that purpose five research questions were associated with this study. The population for this study was all non-ISO certified business organizations in both public and private sector and was physically located in Ivory Coast. The population sample for this study was the 5044 members of the Chambre de Commerce et dIndustrie de Cote dIvoire CCI from which the author utilized the sample size of 60 business organizations randomly selected. This study utilized a survey questionnaire of face to face interview as data collection method. The survey questionnaire contained thirty three 33 questions organized in six parts and was proposed to 60 business organizations leaders. The result showed that business organization leaders in Ivory Coast were aware of the ISO 900 QMS but do not have enough knowledge on the ISO 9000 QMS implementation and certification. This could be due to the poor job done by CODIMORM the local national bureau of standards as a source of information. However it was found that business organization leaders in Ivory Coast intended to pursue and obtain ISO 9000 QMS certification. With respect to perceived benefits they indicated customer satisfaction improvement as the most important benefit that ISO 9000 QMS certification could bring to their general management activities. With respect to perceived improvements they selected quality of productsservices as the most important improvement that ISO 9000 QMS implementation and certification could help to achieve. Overall business organization leaders in Ivory

  10. A new approach in the development of quality management systems for (micro)electronics

    Science.gov (United States)

    Bacivarov, Ioan C.; Bacivarov, Angelica; Gherghina, Cǎtǎlina

    2016-12-01

    This paper presents the new approach in the analysis of the Quality Management Systems (QMS) of companies, based on the revised standard ISO 9001:2015. In the first part of the paper, QMS based on ISO 9001 certification are introduced; the changes and the updates proposed for the new version of ISO 9001:2015 are critically analyzed, based on the documents elaborated by ISO/TC 176. The approach based on ISO 9001:2015 could be considered as "beginning of a new era in development of quality management systems". A comparison between the between the "old" standard ISO 9001:2008 and the "new" standard ISO 9001:2015 is made. In the second part of the paper, steps to be followed in a company to implement this new standard are presented. A peculiar attention is given to the new concept of risk-based thinking in order to support and improve application of the process based approach. The authors conclude that, by considering risk throughout the organization the likelihood of achieving stated objectives is improved, output is more consistent and customers can be confident that they will receive the expected results. Finally, the benefits of the new approach in the development of quality management systems are outlined, as well as how they are reflected in the management of companies in general and those in electronics field, in particular. As demonstrated in this paper, well understood and properly applied, the new approach based on the revised standard ISO9001:2015 could offer a better quality management for companies operating in electronics and beyond.

  11. Small supermarket management system

    Institute of Scientific and Technical Information of China (English)

    曹正

    2016-01-01

    This system USES the Java language in the MyEclipse platform development tool, SQL2005 as the database platform for data and data, the SQL2005 required for the user operating system. It mainly implements the daily management of goods, including purchase management, inventory management, sales management, personnel management and supplier management. The system can also complete the functions of browsing, querying, adding, deleting and modifying relevant information. This topic is the core of the stock management, inventory management and sales management, at the same time, the system also has the full user management and permissions management function..

  12. Supplier Performance Monitoring and Improvement (SPMI through SIPOC Analysis and PDCA Model to the ISO 9001 QMS in Sports Goods Manufacturing Industry

    Directory of Open Access Journals (Sweden)

    2011-12-01

    Full Text Available Background: Increasing global competition and customer expectations are forcing companies to improve their supplier performance as part of their supply chain governance initiative. A sport goods manufacturing industry is intensive supplier base industry and majority of these comes under small medium enterprises with limited resources. Developing an easy - deploy, cost effective and result oriented frame work for this industry is a critical business competency. Methods: This paper lays out a framework - a "standard operating system" - for continuous supplier performance monitoring and improvement (SPMI and is composed of following sections. In the first section supplier performance monitoring and improvement is overviewed with its basic concepts, and then improvement methods used in the paper are explained based on literature review. The third and fourth section focus on the methodology, explaining the way of SIPOC Analysis and PDCA application with using ISO 9001; 2008 QMS standards and example showing its results. Results: The existing process of Supplier Performance Monitoring and Improvement (SPMI was defined and mapped and then analyzed and revised through SIPOC Analysis by incorporating to PDCA Cycle and ISO 9001 QMS to identify problem areas, variations and unnecessary activities. Corrective actions were recommended to deal with problem areas and an improved and revised Supplier Performance Monitoring and Improvement (SPMI Process is suggested. Conclusions: Every organization needs to use a proper combination and selection of quality tools, methodologies and techniques for implementing continuous quality improvement process. This framework will provide a guidance for anyone who wants to develop supplier performance measurement system in sports goods manufacturing industry and other small - medium enterprises.

  13. Establishment of a Quality Management System Based on ISO 9001 Standard in a Public Service Fungal Culture Collection

    Science.gov (United States)

    Simões, Marta F.; Dias, Nicolina; Santos, Cledir; Lima, Nelson

    2016-01-01

    Collaborations between different Microbiological Resource Centres (mBRCs) and ethical sourcing practices are mandatory to guarantee biodiversity conservation, successful and sustainable preservation and fair share of benefits that arise from the use of genetic resources. Since microbial Culture Collections (CCs) are now engaged in meeting high quality operational standards, they are facing the challenge of establishing quality control criteria to certify their biological materials. The authentication/certification of strains is nowadays a demand from the bioeconomy sector for the global operation of mBRCs. The achievement of consistent quality assurance and trust within the mBRCs and microbial CCs context is a dynamic and never-ending process. A good option to facilitate that process is to implement a Quality Management System (QMS) based on the ISO 9001 standard. Here, we report a detailed description of all the steps taken for the QMS implementation at the Portuguese CC of filamentous fungi: Micoteca da Universidade do Minho (MUM). Our aim is to provide guidelines for the certification of other CCs, so that they can also enhance the search and choice of the most consistent, reliable, and effective operating methods, with assured procedures and validation of preservation; and guarantee trustworthy relations with all stakeholders. PMID:27681915

  14. Establishment of a Quality Management System Based on ISO 9001 Standard in a Public Service Fungal Culture Collection

    KAUST Repository

    Simoes, Marta

    2016-06-22

    Collaborations between different Microbiological Resource Centres (mBRCs) and ethical sourcing practices are mandatory to guarantee biodiversity conservation, successful and sustainable preservation and fair share of benefits that arise from the use of genetic resources. Since microbial Culture Collections (CCs) are now engaged in meeting high quality operational standards, they are facing the challenge of establishing quality control criteria to certify their biological materials. The authentication/certification of strains is nowadays a demand from the bioeconomy sector for the global operation of mBRCs. The achievement of consistent quality assurance and trust within the mBRCs and microbial CCs context is a dynamic and never-ending process. A good option to facilitate that process is to implement a Quality Management System (QMS) based on the ISO 9001 standard. Here, we report a detailed description of all the steps taken for the QMS implementation at the Portuguese CC of filamentous fungi: Micoteca da Universidade do Minho (MUM). Our aim is to provide guidelines for the certification of other CCs, so that they can also enhance the search and choice of the most consistent, reliable, and effective operating methods, with assured procedures and validation of preservation; and guarantee trustworthy relations with all stakeholders.

  15. Establishment of a Quality Management System Based on ISO 9001 Standard in a Public Service Fungal Culture Collection.

    Science.gov (United States)

    Simões, Marta F; Dias, Nicolina; Santos, Cledir; Lima, Nelson

    2016-06-22

    Collaborations between different Microbiological Resource Centres (mBRCs) and ethical sourcing practices are mandatory to guarantee biodiversity conservation, successful and sustainable preservation and fair share of benefits that arise from the use of genetic resources. Since microbial Culture Collections (CCs) are now engaged in meeting high quality operational standards, they are facing the challenge of establishing quality control criteria to certify their biological materials. The authentication/certification of strains is nowadays a demand from the bioeconomy sector for the global operation of mBRCs. The achievement of consistent quality assurance and trust within the mBRCs and microbial CCs context is a dynamic and never-ending process. A good option to facilitate that process is to implement a Quality Management System (QMS) based on the ISO 9001 standard. Here, we report a detailed description of all the steps taken for the QMS implementation at the Portuguese CC of filamentous fungi: Micoteca da Universidade do Minho (MUM). Our aim is to provide guidelines for the certification of other CCs, so that they can also enhance the search and choice of the most consistent, reliable, and effective operating methods, with assured procedures and validation of preservation; and guarantee trustworthy relations with all stakeholders.

  16. Credit Management System

    Data.gov (United States)

    US Agency for International Development — Credit Management System. Outsourced Internet-based application. CMS stores and processes data related to USAID credit programs. The system provides information...

  17. Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP)

  18. Integrated management systems and workflow-based electronic document management: An empirical study

    Directory of Open Access Journals (Sweden)

    Hang Thu Pho

    2014-01-01

    Full Text Available Purpose: Many global organizations have aligned their strategy and operation via the ISO-based framework of integrated management system (IMS that allows them to merge quality, environment, health and safety management systems. In such context, having a robust electronic document management system (EDMS is essential, especially at global enterprises where a large amount of documents generated by processes flows through different work cultures. However, there is no "one-size-fits-all" design for EDMS because it depends on organizations' needs, size and resource allocation. This article discusses the interrelation between EDMS and IMS in order to suggest a best practice. Design/methodology/approach: This article methodologically based upon a qualitative, interpretivistic, longitudinal empirical study in a wind turbine factory. Findings and Originality/value: IMS improvement and effectiveness has been overlooking EDMS as a key factor in establishing appropriate technological support of the IMS processes. Rightful application of EDMS can further contribute to organizational learning, precision of documentation and cross-organisational collaboration. Research limitations/implications: Theorising on IMS needs a stronger perspective of the technological limitations and potentials of basing IMS on EDMS. Practical implications: IMS are complex systems involving a large number of administrative functions. EDMS provides a formal representation with automation potentials both heightening and securing document trustworthiness. Social implications: IMS has a tendency to stay with professionals, e.g. line managers and QA/QC/QMS professionals. The EDMS line of discussion suggests a broader inclusion. Originality/value: Researching IMS as a technological implementation is giving a better platform of aligning the IMS with other business processes and is bringing IMS closer to the operational activities within the enterprise.

  19. Maintenance and management system

    International Nuclear Information System (INIS)

    Ando, Yasumasa.

    1992-01-01

    Since highly reliable operation is required in a nuclear power plant, monitoring during operation and periodical inspection are conducted carefully. The present invention provides maintenance and management systems for providing an aid so that these systems are combined effectively and operated rationally based on unified information management. That is, the system contains data bases comprising information for the design of the equipments and pipelines of a plant, information for the exchange of equipment parts, information for the history of plant operation, information for the monitoring and inspection, and information for the management of repair operation. In addition, it has an equipment part history management sub-system for managing equipment part exchange information, an operation history management sub-system for managing the operation state of the plant, an operation history management sub-system for managing equipment monitoring inspection data and operation management sub-system for managing periodical inspection/ repairing operation. These sub-systems are collectively combined to manage the maintenance and management jobs of the plant unitarily. (I.S.)

  20. Systems Engineering and Management Applications of ISO 9001:2015 for Government

    Science.gov (United States)

    Shepherd, Christena C.

    2016-01-01

    The manufacturing segment of the business world is busy assessing the impact of ISO 9001:2015, and updating their management systems to meet the required compliance date. What does the new revision mean for government agencies that deliver large engineering projects rather than mass production? In fact, the standard, especially the new revision, can be used quite readily for government agencies, or applied to specific projects, once it is understood in terms of the similarities with systems engineering and project management. From there it can be extrapolated to "mission realization" systems, and a Quality Management System (QMS) is a logical result that can bring order to processes and systems that likely already exist in some fashion. ISO 9001:2015 is less product-oriented than previous versions. It can be more broadly applied to public organizations as well as private; and to services (missions) as well as products. The emphasis on risk management in the revised standard provides the needed balance for weighing decisions with respect to cost, schedule, technical, safety, and regulatory compliance; so if this is not part of agency governance already, this is a good place to start, especially for large engineering projects. The Systems Engineering standard used for this analysis is from NASA's NPR 7123.1 NASA Systems Engineering Processes and Requirements; however, those who are more familiar with ISO/IEC 26702 Systems Engineering-application and management of the systems engineering process, or SAE/EIA 632 Processes for Engineering a System will also recognize the similarities. In reality, the QMS outlined by ISO 9001 reinforces the systems engineering processes, and serves to ensure that they are adequately implemented, although most of the ISO 9001 literature emphasizes the production and process aspects of the standard. Rather than beginning with ISO 9001and getting lost in the vocabulary, it is useful to begin with the systems engineering lifecycle

  1. Maintenance management systems

    International Nuclear Information System (INIS)

    Rohan, M. de

    1989-01-01

    This paper is concerned principally with Maintenance Management systems and their effective introduction into organisations. Maintenance improvement is basically a problem of managing the maintenance department in the broadest sense. Improvement does not only lie in the area of special techniques, systems or procedures; although they are valuable tools, but rather in a balanced attack, carefully guided by management. Over recent years, maintenance systems have received the major emphasis and in many instances the selection of the system has become a pre-occupation, whereas the importance of each maintenance function must be recognised and good management practices applied to all maintenance activities. The ingredients for success in the implementation of maintenance management systems are summarised as: having a management committee, clear objectives, project approach using project management techniques and an enthusiastic leader, user managed and data processing supported project, realistic budget and an understanding of the financial audit requirements. (author)

  2. Integrated management system best practices in radioecological laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho, Claudia Aparecida Zerbinatti de [Centro Tecnologico da Marinha em Sao Paulo (CTMSP), SP (Brazil). Dept. da Qualidade], e-mail: clau.zerbina@gmail.com; Zouain, Desiree Moraes [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)], e-mail: dmzouain@ipen.br

    2009-07-01

    This paper presents a Master dissertation advancements with the target of studying the best practices, in order to give support to an IMS conceptual model ?Integrated Management System (quality, environment, work safety and health), applied to radioecological laboratories. The planning of the proposed research comprises the following stages: first stage - the bibliographic and documental survey in IMS; a survey and study of the applied standards (QMS NBR ISO 9000 (2005), NBR ISO 9001 (2008), NBR ISO 9004 (2000), EMS 14001(2004) and OHSMS OHSAS 18001 (2007) and OHSAS 18002 (2008)); identification and characterization in radioecological laboratories processes; a methodological study of better practices and benchmarking is carried out. In the second stage of the research, the development of a case study is forecast (qualitative research, with electronic questionnaires and personal interviews, when possible), preceded by a survey and selection of international and national radioecological laboratories to be studied and, in sequence, these laboratories should be contacted and agree to participate in the research; in a third stage, the construction of a matrix of better practices, which incur in the results able to subside an IMS conceptual model proposition for radioecological laboratories; the fourth and last stage of the research comprises the construction of a conceptual proposal of an IMS structure for radioecological laboratories. The first stage of the research results are presented concisely, as well as a preliminary selection of laboratories to be studied. (author)

  3. Integrated management system best practices in radioecological laboratories

    International Nuclear Information System (INIS)

    Carvalho, Claudia Aparecida Zerbinatti de

    2009-01-01

    This paper presents a Master dissertation advancements with the target of studying the best practices, in order to give support to an IMS conceptual model ?Integrated Management System (quality, environment, work safety and health), applied to radioecological laboratories. The planning of the proposed research comprises the following stages: first stage - the bibliographic and documental survey in IMS; a survey and study of the applied standards (QMS NBR ISO 9000 (2005), NBR ISO 9001 (2008), NBR ISO 9004 (2000), EMS 14001(2004) and OHSMS OHSAS 18001 (2007) and OHSAS 18002 (2008)); identification and characterization in radioecological laboratories processes; a methodological study of better practices and benchmarking is carried out. In the second stage of the research, the development of a case study is forecast (qualitative research, with electronic questionnaires and personal interviews, when possible), preceded by a survey and selection of international and national radioecological laboratories to be studied and, in sequence, these laboratories should be contacted and agree to participate in the research; in a third stage, the construction of a matrix of better practices, which incur in the results able to subside an IMS conceptual model proposition for radioecological laboratories; the fourth and last stage of the research comprises the construction of a conceptual proposal of an IMS structure for radioecological laboratories. The first stage of the research results are presented concisely, as well as a preliminary selection of laboratories to be studied. (author)

  4. Laboratory quality management system: Road to accreditation and beyond

    Directory of Open Access Journals (Sweden)

    V Wadhwa

    2012-01-01

    Full Text Available This review attempts to clarify the concepts of Laboratory Quality Management System (Lab QMS for a medical testing and diagnostic laboratory in a holistic way and hopes to expand the horizon beyond quality control (QC and quality assurance. It provides an insight on accreditation bodies and highlights a glimpse of existing laboratory practices but essentially it takes the reader through the journey of accreditation and during the course of reading and understanding this document, prepares the laboratory for the same. Some of the areas which have not been highlighted previously include: requirement for accreditation consultants, laboratory infrastructure and scope, applying for accreditation, document preparation. This section is well supported with practical illustrations and necessary tables and exhaustive details like preparation of a standard operating procedure and a quality manual. Concept of training and privileging of staff has been clarified and a few of the QC exercises have been dealt with in a novel way. Finally, a practical advice for facing an actual third party assessment and caution needed to prevent post-assessment pitfalls has been dealt with.

  5. Integrated management system best practices in radioecological laboratories

    International Nuclear Information System (INIS)

    Carvalho, Claudia Aparecida Zerbinatti de

    2010-01-01

    The research aims to study the best practices to support a conceptual proposal for IMS - Integrated Management System (quality, environment, safety and health) applicable to Radioecology laboratories. The research design is organized into the following steps: in a first step, it was developed the bibliographic and documentary research in IMS, survey and study of standards (QMS ISO 9000 (2005), ISO 9001 (2008), ISO 9004 (2000), EMS ISO 14001 (2004) and OHSMS OHSAS 18001 (2007) and OHSAS 18002 (2008)), identification and characterization of processes in Radioecology Laboratories and study of best practices methodology and benchmarking; in the second stage of the research it was developed a case study (qualitative research, with questionnaires via e-mail and interviews, when possible), preceded by a survey and selection of international and national radioecology laboratories and then these laboratories were contacted and some of them agreed to participate in this research; in the third stage of the research it was built the framework of best practices that showed results that could support the conceptual proposal for the IMS Radioecology Laboratory; the fourth and final stage of research consisted in the construction of the proposed conceptual framework of SGI for Radioecology Laboratory, being then achieved the initial objective of the research. (author)

  6. Business advertisements management system

    OpenAIRE

    Rekel, Ernest

    2017-01-01

    Business Advertisements Management System The main goal of the project was to create a business advertisements management system, where users could easily create and find business advertisements. To accomplish this goal exist- ing systems were analyzed as well as their limitations. The end result is a working system which is able to store and proccess huge amount of data.

  7. Integrated management systems

    CERN Document Server

    Bugdol, Marek

    2015-01-01

    Examining the challenges of integrated management, this book explores the importance and potential benefits of using an integrated approach as a cross-functional concept of management. It covers not only standardized management systems (e.g. International Organization for Standardization), but also models of self-assessment, as well as different types of integration. Furthermore, it demonstrates how processes and systems can be integrated, and how management efficiency can be increased. The major part of this book focuses on management concepts which use integration as a key tool of management processes (e.g. the systematic approach, supply chain management, virtual and network organizations, processes management and total quality management). Case studies, illustrations, and tables are also provided to exemplify and illuminate the content, as well as examples of successful and failed integrations. Providing a particularly useful resource to managers and specialists involved in the improvement of organization...

  8. A systematic review of instruments that assess the implementation of hospital quality management systems.

    Science.gov (United States)

    Groene, Oliver; Botje, Daan; Suñol, Rosa; Lopez, Maria Andrée; Wagner, Cordula

    2013-10-01

    Health-care providers invest substantial resources to establish and implement hospital quality management systems. Nevertheless, few tools are available to assess implementation efforts and their effect on quality and safety outcomes. This review aims to (i) identify instruments to assess the implementation of hospital quality management systems, (ii) describe their measurement properties and (iii) assess the effects of quality management on quality improvement and quality of care outcomes. We performed a systematic literature search from 1990 to 2011 in PubMed, CINAHL, EMBASE, Cochrane Library and Web of Science. In addition, we used snowball strategies, screened the reference lists of eligible papers, reviewed grey literature and contacted experts in the field. and data extraction Two reviewers screened eligible papers based on pre-defined inclusion and exclusion criteria and all authors extracted data. Eligible papers are described in terms of general characteristics (settings, type and level of respondents, mode of data collection), methodological properties (sampling strategy, item derivation, conceptualization of quality management, assessment of reliability and validity, scoring) and application/implementation (accounting for context, organizational adaptations, sensitivity to change, deployment and effect size). Eighteen papers were deemed eligible for inclusion. While some common domains emerged in measurement conceptualization, substantial differences in scope persist. The instruments' measurement properties were insufficiently described and only few instruments assessed links between the implementation of quality management systems (QMS) and improvement strategies or outcomes. There is currently no well-established measure to assess the implementation and effectiveness of quality management systems. Future research should address this gap.

  9. Audit Information Management System

    Data.gov (United States)

    US Agency for International Development — USAID/OIG has initiated its new Audit Information Management System (AIMS) to track OIG's audit recommendations and USAID's management decisions. OIG's in-house...

  10. Managing hybrid marketing systems.

    Science.gov (United States)

    Moriarty, R T; Moran, U

    1990-01-01

    As competition increases and costs become critical, companies that once went to market only one way are adding new channels and using new methods - creating hybrid marketing systems. These hybrid marketing systems hold the promise of greater coverage and reduced costs. But they are also hard to manage; they inevitably raise questions of conflict and control: conflict because marketing units compete for customers; control because new indirect channels are less subject to management authority. Hard as they are to manage, however, hybrid marketing systems promise to become the dominant design, replacing the "purebred" channel strategy in all kinds of businesses. The trick to managing the hybrid is to analyze tasks and channels within and across a marketing system. A map - the hybrid grid - can help managers make sense of their hybrid system. What the chart reveals is that channels are not the basic building blocks of a marketing system; marketing tasks are. The hybrid grid forces managers to consider various combinations of channels and tasks that will optimize both cost and coverage. Managing conflict is also an important element of a successful hybrid system. Managers should first acknowledge the inevitability of conflict. Then they should move to bound it by creating guidelines that spell out which customers to serve through which methods. Finally, a marketing and sales productivity (MSP) system, consisting of a central marketing database, can act as the central nervous system of a hybrid marketing system, helping managers create customized channels and service for specific customer segments.

  11. Management Information Systems Research.

    Science.gov (United States)

    Research on management information systems is illusive in many respects. Part of the basic research problem in MIS stems from the absence of standard...decision making. But the transition from these results to the realization of ’satisfactory’ management information systems remains difficult indeed. The...paper discusses several aspects of research on management information systems and reviews a selection of efforts that appear significant for future progress. (Author)

  12. Transforming an EPA QA/R-2 quality management plan into an ISO 9002 quality management system.

    Science.gov (United States)

    Kell, R A; Hedin, C M; Kassakhian, G H; Reynolds, E S

    2001-01-01

    The Environmental Protection Agency's (EPA) Office of Emergency and Remedial Response (OERR) requires environmental data of known quality to support Superfund hazardous waste site projects. The Quality Assurance Technical Support (QATS) Program is operated by Shaw Environmental and Infrastructure, Inc. to provide EPA's Analytical Operations Center (AOC) with performance evaluation samples, reference materials, on-site laboratory auditing capabilities, data audits (including electronic media data audits), methods development, and other support services. The new QATS contract awarded in November 2000 required that the QATS Program become ISO 9000 certified. In a first for an EPA contractor, the QATS staff and management successfully transformed EPA's QA/R-2 type Quality Management Plan into a Quality Management System (QMS) that complies with the requirements of the internationally recognized ISO 9002 standard and achieved certification in the United States, Canada, and throughout Europe. The presentation describes how quality system elements of ISO 9002 were implemented on an already existing quality system. The psychological and organizational challenges of the culture change in QATS' day-to-day operations will be discussed for the benefit of other ISO 9000 aspirants.

  13. Facility Environmental Management System

    Data.gov (United States)

    Federal Laboratory Consortium — This is the Web site of the Federal Highway Administration's (FHWA's) Turner-Fairbank Highway Research Center (TFHRC) facility Environmental Management System (EMS)....

  14. NASA's Risk Management System

    Science.gov (United States)

    Perera, Jeevan S.

    2011-01-01

    Leadership is key to success. Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks -- risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  15. Learning Content Management Systems

    Directory of Open Access Journals (Sweden)

    Tache JURUBESCU

    2008-01-01

    Full Text Available The paper explains the evolution of e-Learning and related concepts and tools and its connection with other concepts such as Knowledge Management, Human Resources Management, Enterprise Resource Planning, and Information Technology. The paper also distinguished Learning Content Management Systems from Learning Management Systems and Content Management Systems used for general web-based content. The newest Learning Content Management System, very expensive and yet very little implemented is one of the best tools that helps us to cope with the realities of the 21st Century in what learning concerns. The debates over how beneficial one or another system is for an organization, can be driven by costs involved, efficiency envisaged, and availability of the product on the market.

  16. Impact analysis of the implemented quality management system on business performances in pharmaceutical-chemical industry in Serbia

    Directory of Open Access Journals (Sweden)

    Marinković Valentina D.

    2013-01-01

    Full Text Available International quality management standard (QMS ISO 9001 became widely accepted as a framework for product and/or services quality improvement. There are recent research conducted in order to define relationships and effects between the applied QMS and financial and/or non-financial business parameters. The effects of the applied pharmaceutical quality system (PQS on the business performances in Serbian pharmaceutical-chemical industry are analyzed in this paper using multivariate linear regression analysis. The empirical data were collected using a survey that was performed among experts from Serbian pharmaceutical-chemical industrial sector during 2010. An extensive questionnaire was used in the survey, grouping the questions in eight groups: Implementation of pharmaceutical quality system (AQ, Quality/strategy planning (QP, Human resource management (HR, Supply management (SM, Customer focus (CF, Process management (PM, Continuous improvement (CI, and Business results (BR. The primary goal of the research was to analyze the effects of the elements of first seven groups (AQ, QP, HR, SM, CF, PM, and CI that present various aspects of the implementation of PQS, on the elements of business results (BR. Based on empirical data, regression relations were formed to present the effects of all considered elements of PQS implementation on the business performance parameters (BR. The positive effects of PQS implementation on the business performances such as the assessment of performance indicators, continual products and/or services quality improvement, and efficient problem solving, are confirmed in the presented research for the Serbian pharmaceutical-chemical industrial sector. The results of the presented research will create a room for the improvement of the existing models in application, and for attracting interested parties that aim to commence this business standardization process. Hence, implementation of PQS is not only the regulatory

  17. NASA's Risk Management System

    Science.gov (United States)

    Perera, Jeevan S.

    2013-01-01

    Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks - not just risk office personnel. Each group/department is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk informed decision making should be introduced to all levels of management. ? Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  18. Lithium battery management system

    Science.gov (United States)

    Dougherty, Thomas J [Waukesha, WI

    2012-05-08

    Provided is a system for managing a lithium battery system having a plurality of cells. The battery system comprises a variable-resistance element electrically connected to a cell and located proximate a portion of the cell; and a device for determining, utilizing the variable-resistance element, whether the temperature of the cell has exceeded a predetermined threshold. A method of managing the temperature of a lithium battery system is also included.

  19. Archival Information Management System.

    Science.gov (United States)

    1995-02-01

    management system named Archival Information Management System (AIMS), designed to meet the audit trail requirement for studies completed under the...are to be archived to the extent that future reproducibility and interrogation of results will exist. This report presents a prototype information

  20. Medical Information Management System

    Science.gov (United States)

    Alterescu, S.; Hipkins, K. R.; Friedman, C. A.

    1979-01-01

    On-line interactive information processing system easily and rapidly handles all aspects of data management related to patient care. General purpose system is flexible enough to be applied to other data management situations found in areas such as occupational safety data, judicial information, or personnel records.

  1. Selected Aspects Of The Risk In The Supply Chain In Context Of The Supplier Quality Management

    Directory of Open Access Journals (Sweden)

    Koblen Ivan

    2015-06-01

    Full Text Available The introductory part of the paper underlines the importance of "Risk-based thinking" in the Quality Management System (QMS and risk in the supply chain, as a principle part of the QMS. After introducing the key terms, the authors focused on the principle part of the article - explanation of the external and internal supply chain risks and the main factors concerning the supply risks, demand risks and environmental risks (as cardinal types of external supply chain risks as well as the manufacturing and process risks, network/planning and control risks (as most important types of internal supply chain risks. The authors inform on the selected supply chain risk management tools, especially on those which are linked to the appropriate utilization of quality management tools.

  2. Selected Aspects Of The Risk In The Supply Chain In Context Of The Supplier Quality Management

    Science.gov (United States)

    Koblen, Ivan; Lestyánszka Škůrková, Katarína

    2015-06-01

    The introductory part of the paper underlines the importance of "Risk-based thinking" in the Quality Management System (QMS) and risk in the supply chain, as a principle part of the QMS. After introducing the key terms, the authors focused on the principle part of the article - explanation of the external and internal supply chain risks and the main factors concerning the supply risks, demand risks and environmental risks (as cardinal types of external supply chain risks) as well as the manufacturing and process risks, network/planning and control risks (as most important types of internal supply chain risks). The authors inform on the selected supply chain risk management tools, especially on those which are linked to the appropriate utilization of quality management tools.

  3. Operations management system

    Science.gov (United States)

    Brandli, A. E.; Eckelkamp, R. E.; Kelly, C. M.; Mccandless, W.; Rue, D. L.

    1990-01-01

    The objective of an operations management system is to provide an orderly and efficient method to operate and maintain aerospace vehicles. Concepts are described for an operations management system and the key technologies are highlighted which will be required if this capability is brought to fruition. Without this automation and decision aiding capability, the growing complexity of avionics will result in an unmanageable workload for the operator, ultimately threatening mission success or survivability of the aircraft or space system. The key technologies include expert system application to operational tasks such as replanning, equipment diagnostics and checkout, global system management, and advanced man machine interfaces. The economical development of operations management systems, which are largely software, will require advancements in other technological areas such as software engineering and computer hardware.

  4. Program Management System manual

    International Nuclear Information System (INIS)

    1986-01-01

    The Program Management System (PMS), as detailed in this manual, consists of all the plans, policies, procedure, systems, and processes that, taken together, serve as a mechanism for managing the various subprograms and program elements in a cohesive, cost-effective manner. The PMS is consistent with the requirements of the Nuclear Waste Policy Act of 1982 and the ''Mission Plan for the Civilian Radioactive Waste Management Program'' (DOE/RW-0005). It is based on, but goes beyond, the Department of Energy (DOE) management policies and procedures applicable to all DOE programs by adapting these directives to the specific needs of the Civilian Radioactive Waste Management program. This PMS Manual describes the hierarchy of plans required to develop and maintain the cost, schedule, and technical baselines at the various organizational levels of the Civilian Radioactive Waste Management Program. It also establishes the management policies and procedures used in the implementation of the Program. These include requirements for internal reports, data, and other information; systems engineering management; regulatory compliance; safety; quality assurance; and institutional affairs. Although expanded versions of many of these plans, policies, and procedures are found in separate documents, they are an integral part of this manual. The PMS provides the basis for the effective management that is needed to ensure that the Civilian Radioactive Waste Management Program fulfills the mandate of the Nuclear Waste Policy Act of 1982. 5 figs., 2 tabs

  5. Role and Status of Quality Managers in Organisation of the Future

    Directory of Open Access Journals (Sweden)

    Vinko Bogataj

    2017-06-01

    Full Text Available Research question (RQ: What is discrepancy between status and role of quality managers in the Slovenian organisations now and what will be role and status of quality managers of the future? Aim: The aim of this paper is to show divergence between current and expected future status and role of quality managers (QM. Methods: Within the research of characteristics of quality management system (QMS in the Slovenian organisations a survey among the QM and the directors was conducted as well as the correlation analysis between the role of the QM and the results achieved by the organisations. Results: It was shown that »the advisor to the management« is the only role of the QM that has a significant positive correlation with the results achieved by the organisation. Organisation: The results of this research enable management to take appropriate steps in organisational development and integration of all projects on organisational changes leading to a common and comprehensive long-term concept. Society/Environment: The research offers some answers to the expected influence of changes in the environment on the future organisation of QMS. Originality: This research represents the first example of research of status and role of QM in the Slovenian organisations. Limitations / further research: This research project is limited to the Slovenian organisations with a certified QMS. In future, similar surveys could also be spread to other social environments such as Germany, Austria and the Czech Republic.

  6. Management information systems

    Energy Technology Data Exchange (ETDEWEB)

    Crump, K.

    1978-01-01

    An Australian university architect studying management information systems programs at academic institutions in the United States visited 26 universities and colleges and nine educational and professional associations, including extended visits at the University of Wisconsin and the National Center of Higher Education Management Systems. During these visits, he investigated university and college space utilization programs, gained operational and developmental experience at institutions with education philosophies similar to those in Australia, and examined trends in low cost student housing. This report of his observations focusses on management information systems projects throughout the academic community, resource accountability, energy conservation, facilities planning for the handicapped, student housing, and interdisciplinary approaches to education.

  7. Portfolio Management System

    Data.gov (United States)

    US Agency for International Development — PfMS is an implementation of WorkLenz. WorkLenz is USAID's portfolio management system tool. It is a commercially available, off-the-shelf (COTS) package that...

  8. Environmental Management Systems

    Science.gov (United States)

    This site on Environmental Management Systems (EMS) provides information and resources related to EMS for small businesses and private industry, as well as local, state and federal agencies, including all the EPA offices and laboratories.

  9. Holdings Management System

    Data.gov (United States)

    National Archives and Records Administration — This system supports the physical management of permanent, hard-copy archival Records in the custody of National Archives and Records Administration program offices.

  10. Correspondence Management System

    Data.gov (United States)

    U.S. Environmental Protection Agency — CMS is EPA's correspondence tracking and workflow management system. It scans, logs, routes, tracks, and stores incoming and outgoing correspondence in all Program...

  11. Earned Value Management System

    Data.gov (United States)

    US Agency for International Development — EVMS is a system for measuring project performance and progress in an objective manner by supporting earned value management. EVMS has the ability to combine...

  12. A distribution management system

    Energy Technology Data Exchange (ETDEWEB)

    Verho, P.; Jaerventausta, P.; Kaerenlampi, M.; Paulasaari, H. [Tampere Univ. of Technology (Finland); Partanen, J. [Lappeenranta Univ. of Technology (Finland)

    1996-12-31

    The development of new distribution automation applications is considerably wide nowadays. One of the most interesting areas is the development of a distribution management system (DMS) as an expansion of the traditional SCADA system. At the power transmission level such a system is called an energy management system (EMS). The idea of these expansions is to provide supporting tools for control center operators in system analysis and operation planning. The needed data for new applications is mainly available in some existing systems. Thus the computer systems of utilities must be integrated. The main data source for the new applications in the control center are the AM/FM/GIS (i.e. the network database system), the SCADA, and the customer information system (CIS). The new functions can be embedded in some existing computer system. This means a strong dependency on the vendor of the existing system. An alternative strategy is to develop an independent system which is integrated with other computer systems using well-defined interfaces. The latter approach makes it possible to use the new applications in various computer environments, having only a weak dependency on the vendors of the other systems. In the research project this alternative is preferred and used in developing an independent distribution management system

  13. A distribution management system

    Energy Technology Data Exchange (ETDEWEB)

    Verho, P; Jaerventausta, P; Kaerenlampi, M; Paulasaari, H [Tampere Univ. of Technology (Finland); Partanen, J [Lappeenranta Univ. of Technology (Finland)

    1997-12-31

    The development of new distribution automation applications is considerably wide nowadays. One of the most interesting areas is the development of a distribution management system (DMS) as an expansion of the traditional SCADA system. At the power transmission level such a system is called an energy management system (EMS). The idea of these expansions is to provide supporting tools for control center operators in system analysis and operation planning. The needed data for new applications is mainly available in some existing systems. Thus the computer systems of utilities must be integrated. The main data source for the new applications in the control center are the AM/FM/GIS (i.e. the network database system), the SCADA, and the customer information system (CIS). The new functions can be embedded in some existing computer system. This means a strong dependency on the vendor of the existing system. An alternative strategy is to develop an independent system which is integrated with other computer systems using well-defined interfaces. The latter approach makes it possible to use the new applications in various computer environments, having only a weak dependency on the vendors of the other systems. In the research project this alternative is preferred and used in developing an independent distribution management system

  14. Systems engineering management plan

    International Nuclear Information System (INIS)

    Conner, C.W.

    1985-10-01

    The purpose of this Systems Engineering Management Plan (SEMP) is to prescribe the systems engineering procedures to be implemented at the Program level and the minimum requirements for systems engineering at the Program-element level. The Program level corresponds to the Director, OCRWM, or to the organizations within OCRWM to which the Director delegates responsibility for the development of the System and for coordinating and integrating the activities at the Program-element level. The Office of Policy and Outreach (OPO) and the Office of Resource Management (ORM) support the Director at the Program level. The Program-element level corresponds to the organizations within OCRWM (i.e., the Office of Geologic Repositories (OGR) and the Office of Storage and Transportation Systems (OSTS)) with overall responsibility for developing the System elements - that is, the mined geologic disposal system (MGDS), monitored retrievable storage (MRS) (if approved by Congress), and the transportation system

  15. [Quality management in pathology--an executive function and political implications].

    Science.gov (United States)

    Turzynski, A

    2013-09-01

    Quality management (QM) is primarily an in-house executive function. It conduces to ensure a high quality service and has the external object to satisfy customer expectations. In Germany the implementation of quality management systems (QMS) is made compulsory for all medical facilities by law. However, details are not regulated and there is no need to certify the in-house QMS. Within the last 10 years many pathology institutions have become certified or accredited and have implemented voluntary measures of external quality assurance, such as quality circles and round robin trials. For non-certified institutions it might be helpful to be guided by established QM standards like the ISO 9001:2008. The fundamental concepts of QM, some pathology-specific aspects and some implications for the professional associations are discussed in this article.

  16. Audit Management System

    CERN Document Server

    Alconada, Federico

    2015-01-01

    In the need of renewing their system, the Internal Audit department has given a proposal for building a new one. Taking into consideration the problems of their system they elaborated a requirement's list with the functionalities and features they were expecting from the new management system. This new system would be primarily for the use of the Internal Audit staff but it would also support the follow-up of internal audit recommendations by potentially all CERN staff members.

  17. Electrical distribution system management

    International Nuclear Information System (INIS)

    Hajos, L.; Mortarulo, M.; Chang, K.; Sparks, T.

    1990-01-01

    This paper reports that maintenance of electrical system data is essential to the operation, maintenance, and modification of a nuclear station. Load and equipment changes affect equipment sizing, available short-circuit currents and protection coordination. System parameters must be maintained in a controlled manner to enable evaluation of proposed modifications and provide adequate verification and traceability. For this purpose, Public Service Electric and Gas Company has implemented a Verified and Validated Electric Distribution System Management (EDSM) program at the Hope Creek and Salem Nuclear Power Stations. EDSM program integrates computerized configuration management of electrical systems with calculational software the Technical Standard procedures. The software platform is PC-based. The Database Manager and Calculational programs have been linked together through a user friendly menu system. The database management nodule enable s assembly and maintenance of databases for individual loads, buses, and branches within the electrical systems with system access and approval controlled through electronic security incorporated within the database manger. Reports drawn from the database serve as the as-built and/or as-designed record of the system configurations. This module also creates input data files of network parameters in a format readable by the calculational modules. Calculations modules provide load flow, voltage drop, motor starting, and short-circuit analyses, as well as dynamic analyses of bus transfers

  18. Sewer System Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-08-01

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Field Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan.

  19. Program management system manual

    International Nuclear Information System (INIS)

    1989-08-01

    OCRWM has developed a program management system (PMS) to assist in organizing, planning, directing and controlling the Civilian Radioactive Waste Management Program. A well defined management system is necessary because: (1) the Program is a complex technical undertaking with a large number of participants, (2) the disposal and storage facilities to be developed by the Program must be licensed by the Nuclear Regulatory Commission (NRC) and hence are subject to rigorous quality assurance (QA) requirements, (3) the legislation mandating the Program creates a dichotomy between demanding schedules of performance and a requirement for close and continuous consultation and cooperation with external entities, (4) the various elements of the Program must be managed as parts of an integrated waste management system, (5) the Program has an estimated total system life cycle cost of over $30 billion, and (6) the Program has a unique fiduciary responsibility to the owners and generators of the nuclear waste for controlling costs and minimizing the user fees paid into the Nuclear Waste Fund. This PMS Manual is designed and structured to facilitate strong, effective Program management by providing policies and requirements for organizing, planning, directing and controlling the major Program functions

  20. A distribution management system

    Energy Technology Data Exchange (ETDEWEB)

    Jaerventausta, P; Verho, P; Kaerenlampi, M; Pitkaenen, M [Tampere Univ. of Technology (Finland); Partanen, J [Lappeenranta Univ. of Technology (Finland)

    1998-08-01

    The development of new distribution automation applications is considerably wide nowadays. One of the most interesting areas is the development of a distribution management system (DMS) as an expansion to the traditional SCADA system. At the power transmission level such a system is called an energy management system (EMS). The idea of these expansions is to provide supporting tools for control center operators in system analysis and operation planning. Nowadays the SCADA is the main computer system (and often the only) in the control center. However, the information displayed by the SCADA is often inadequate, and several tasks cannot be solved by a conventional SCADA system. A need for new computer applications in control center arises from the insufficiency of the SCADA and some other trends. The latter means that the overall importance of the distribution networks is increasing. The slowing down of load-growth has often made network reinforcements unprofitable. Thus the existing network must be operated more efficiently. At the same time larger distribution areas are for economical reasons being monitored at one control center and the size of the operation staff is decreasing. The quality of supply requirements are also becoming stricter. The needed data for new applications is mainly available in some existing systems. Thus the computer systems of utilities must be integrated. The main data source for the new applications in the control center are the AM/FM/GIS (i.e. the network database system), the SCADA, and the customer information system (CIS). The new functions can be embedded in some existing computer system. This means a strong dependency on the vendor of the existing system. An alternative strategy is to develop an independent system which is integrated with other computer systems using well-defined interfaces. The latter approach makes it possible to use the new applications in various computer environments, having only a weak dependency on the

  1. Materials management information systems.

    Science.gov (United States)

    1996-01-01

    The hospital materials management function--ensuring that goods and services get from a source to an end user--encompasses many areas of the hospital and can significantly affect hospital costs. Performing this function in a manner that will keep costs down and ensure adequate cash flow requires effective management of a large amount of information from a variety of sources. To effectively coordinate such information, most hospitals have implemented some form of materials management information system (MMIS). These systems can be used to automate or facilitate functions such as purchasing, accounting, inventory management, and patient supply charges. In this study, we evaluated seven MMISs from seven vendors, focusing on the functional capabilities of each system and the quality of the service and support provided by the vendor. This Evaluation is intended to (1) assist hospitals purchasing an MMIS by educating materials managers about the capabilities, benefits, and limitations of MMISs and (2) educate clinical engineers and information system managers about the scope of materials management within a healthcare facility. Because software products cannot be evaluated in the same manner as most devices typically included in Health Devices Evaluations, our standard Evaluation protocol was not applicable for this technology. Instead, we based our ratings on our observations (e.g., during site visits), interviews we conducted with current users of each system, and information provided by the vendor (e.g., in response to a request for information [RFI]). We divided the Evaluation into the following sections: Section 1. Responsibilities and Information Requirements of Materials Management: Provides an overview of typical materials management functions and describes the capabilities, benefits, and limitations of MMISs. Also includes the supplementary article, "Inventory Cost and Reimbursement Issues" and the glossary, "Materials Management Terminology." Section 2. The

  2. [Conceiving and implementing an ISO 9001:2000 quality management system: quality improvement and efficiency increase over 3 years at the Dept. of Ophthalmology, Sultan Qaboos University in Oman].

    Science.gov (United States)

    Bialasiewicz, A A; Breidenbach, K; Ganesh, A; Al-Saeidi, R; Ganguly, S S

    2006-10-01

    Oman is a developing country of the Middle East with a University Hospital in a national health system. Problems related to documentation, structure, and procedure prevailing in a multicultural environment result in a lack of productivity. The aim of this study was to test the feasibility of introducing a quality management system according to ISO 9001:2000 into a university department of ophthalmology with special reference to quality and efficiency data over 3 years. Standardized types of documentation (35 documents, 183 forms and formats, and 453 registers) under a formal roof (booklets for work instructions, quality management, procedures) were conceived in 2001 and implemented, and were evaluated by descriptive statistics over the years 2002-2005 with respect to quality and efficiency. In 2005, the departmental QMS was merged into the QMS of the whole hospital. Establishment of "responsibility clusters" with structured surveillance tasks, procedural improvements, and continuous audits resulted in a significant quality improvement already during the implementation until ISO 9001:2000 certification in 2002, and over the following 3 years. The data were assessed by non-conformities documented monthly (total inpatients: -50%, outpatients: -20%, operating theater: -100%, teaching: -10%; p ISO 9001:2000 into a developing country in the Middle East. It has an immediate effect on the increase of efficiency (measured by performance indicators) and quality in all systems providing the possibility for regional benchmarking.

  3. KNOWLEDGE, INTELECTUAL CAPITAL AND QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Stevan Živojinović

    2009-12-01

    Full Text Available From the contemporary change management paradigm and new, knowledge-based economy, we emphasize the impact of advanced managerial tools. As evidenced in practice, simultaneous implementation of several management approaches, concepts and methods brings about more integral corporate success. We advocate integration of up-to-date approaches - knowledge management (KM and intellectual capital management (ICM as well as balanced scorecard (BSC under the "conceptional umbrella" of quality management, i.e. quality management system (QMS and total quality management (TQM. Interrelating elements of these management concepts through comparison of respective characteristics, differences and similarities, connections and complementary activities, we establish relations and interdependence which result in synergy when applied concurrently. QMS implementation (in accordance with ISO 9000 standard series, enroute to TQM, KM is improved, intellectual capital enlarged (via knowledge, skills, motivation, management systems, procedures, information and product flow, customer and other stakeholder relations and application of BSC facilitated. Conversely, KM and BSC improve opportunities for attaining organisational and business excellence. All mentioned concepts can be viewed as facets of modern integral management model, in continual dynamic interaction that brings about a potential for improved competitive advantage and business performance.

  4. Management Information System

    Science.gov (United States)

    1984-01-01

    New Automated Management Information Center (AMIC) employs innovative microcomputer techniques to create color charts, viewgraphs, or other data displays in a fraction of the time formerly required. Developed under Kennedy Space Center's contract by Boeing Services International Inc., Seattle, WA, AMIC can produce an entirely new informational chart in 30 minutes, or an updated chart in only five minutes. AMIC also has considerable potential as a management system for business firms.

  5. Anesthesia information management systems

    OpenAIRE

    Feri Štivan; Janez Benedik; Tomaž Lužar

    2014-01-01

    Introduction: The use of anesthesia information management systems (AIMS) is on the increase. This is particularly true for academic anesthesia departments. The main reasons for slow adoption of these systems in the past are financial barriers associated with implementation of these systems and their not so traditionally obvious potential to improve patient care. In addition, a major obstacle to acceptance of this technology is the concern of users over the impact of the electronic anesthesia...

  6. Advanced alarm management system

    International Nuclear Information System (INIS)

    Easter, J.R.

    1995-01-01

    The Westinghouse Advanced Alarm Management System (AWARE) is one of the Man-Machine Design Interfaces (MMI) which has great flexibility with regard to hardware type and configuration, alarm system concept, plant scope, engineering scope and installation. The AWARE System provides the capability to better manage the quantity prioritization and presentation of real-time process alarm messages in the control room. The messages are specific, precise and dynamic. The AWARE System can provide a large reduction in the number of messages that the control room staff must address at any one time, thus making the alarm message system a useful tool for the operators during situations that normally produce a high volume of messages as well as improving the clarity of the presentation of process abnormalities during small disturbances. The operating staff is now provided with the basis for a better understanding of the current plant state and for taking the appropriate control actions. (2 refs., 3 figs.)

  7. Pickering tool management system

    International Nuclear Information System (INIS)

    Wong, E.H.; Green, A.H.

    1997-01-01

    Tools were being deployed in the station with no process in effect to ensure that they are maintained in good repair so as to effectively support the performance of Maintenance activities. Today's legal requirements require that all employers have a process in place to ensure that tools are maintained in a safe condition. This is specified in the Ontario Health and Safety Act. The Pickering Tool Management System has been chosen as the process at Pickering N.D to manage tools. Tools are identified by number etching and bar codes. The system is a Windows application installed on several file servers

  8. [Efficient document management by introduction of a new, dynamic quality manual application according to DIN EN ISO 9001:2000].

    Science.gov (United States)

    Pache, G; Saueressig, U; Baumann, T; Dürselen, L; Langer, M; Kotter, E

    2008-06-01

    Evaluation of the impact of a new, dynamic computer-aided quality manual application (QMA) regarding the acceptance and efficiency of a quality management system (QMS) according to DIN EN ISO 9001:2000. The QMA combines static pages of HTML with active content generated from an underlying database. Through user access rights, a hierarchy is defined to create and administer quality documents. Document workflow, feedback management and employee survey were analyzed to compare the performance of the new QMH with the formerly used static version. Integration of a document editor and automated document re-approval accelerated the document process by an average of 10 min. In spite of an increase of the yearly document changes of 60%, the administration effort was reduced by approximately 160 h. Integration of the feedback management system into the QMA decreased handling time from an average of 16.5 to 3.4 days. Simultaneously the number of feedback messages increased from 160 in 2005 to 306 in 2006. Employee satisfaction was raised (old: 3.19+/-1.02, new: 1.91+/-0.8). The number of users who partook in the QMA more than once a week also increased from 29.5% to 60%. The computer-aided quality manual application constitutes the basis for the success of our QMS. The possibility to actively participate in the quality management process has led to broad acceptance and usage by the employees. The administration effort was able to be tremendously decreased as compared to conventional QMS.

  9. BWR reactor management system

    International Nuclear Information System (INIS)

    Makino, Kakuji; Kawamura, Atsuo; Yoshioka, Ritsuo; Neda, Toshikatsu.

    1979-01-01

    It is necessary to grasp the delicate state of operation in reactor cores in view of the control of burn-up and power output at the time of the operation management of BWRs. Enormous labor has been required for the collection, processing and evaluation of the data. It is desirable to obtain the safer, more efficient and faster method of operation control by predicting the states in cores including the change of xenon and reflecting them to operation plans as well as by tracing with high accuracy the past burn-up history for a long period. At present, the on-line evaluation of the states in cores is carried out with the process computers attached to respective units, but the amount of data required for core operation management of high degree far exceeds their capacity. From such viewpoints, the research and development on the reactor management system were carried out. The data processing concerning core operation management is performed with newly installed computers utilizing the data from existing process computers, and the operation of reactor cores, the qualitative improvement of management works, labor saving, and fast, efficient operation control are feasible with it. This system was installed in an actual plant in October, 1977. The composition of the system, the prediction of the change in local output distribution accompanying control rod operation, the prediction of the change in the states in cores due to the flow rate of coolant, and the function of collecting plant data are explained. (Kako, I.)

  10. Management control system description

    Energy Technology Data Exchange (ETDEWEB)

    Bence, P. J.

    1990-10-01

    This Management Control System (MCS) description describes the processes used to manage the cost and schedule of work performed by Westinghouse Hanford Company (Westinghouse Hanford) for the US Department of Energy, Richland Operations Office (DOE-RL), Richland, Washington. Westinghouse Hanford will maintain and use formal cost and schedule management control systems, as presented in this document, in performing work for the DOE-RL. This MCS description is a controlled document and will be modified or updated as required. This document must be approved by the DOE-RL; thereafter, any significant change will require DOE-RL concurrence. Westinghouse Hanford is the DOE-RL operations and engineering contractor at the Hanford Site. Activities associated with this contract (DE-AC06-87RL10930) include operating existing plant facilities, managing defined projects and programs, and planning future enhancements. This document is designed to comply with Section I-13 of the contract by providing a description of Westinghouse Hanford's cost and schedule control systems used in managing the above activities. 5 refs., 22 figs., 1 tab.

  11. Integrated management system

    International Nuclear Information System (INIS)

    Florescu, N.

    2003-01-01

    A management system is developed in order to reflect the needs of the business and to ensure that the objectives of the organization will be achieved. The process model and each individual process within the system then needs to identify the drives or requirements from external customers and stakeholders, regulations, and standards such as ISO and 50-C-Q. The processes are then developed to address these drivers. Developing the process in this way makes it fully integrated and capable of incorporating any new requirements. The International Standard (ISO 9000:2000) promotes the adoption of a process approach when developing, implementing and improving the effectiveness of a quality management system to enhance customer satisfaction by meeting customer requirements. The IAEA Code recognizes that the entire work is a process which can be planned, assessed and improved. For an organization to function effectively, numerous linked activities have to be identified and managed. By definition a process is an activity that using resources and taking into account all the constraints imposed executes the necessary operations which transform the inputs in outcomes. Running a system of processes within an organization, identification of the interaction between the processes and their management can be referred to as a 'process approach'. The advantage of such an approach is the ensuring of the ongoing control over the linkage between the individual processes composing the system as well as over their combination and interaction. Developing a management system implies: identification of the process which delivers Critical Success Factor (CSFs) of the business; identifying the support processes enabling the CSFs to be accomplished; identifying the processes that deliver the business fundamentals. An integrated management system should include all activities not only those related to Quality, Health and Safety. When developing an IMS it is necessary to identify all of the drivers

  12. Maintenance work management system

    International Nuclear Information System (INIS)

    Kanai, T.; Takahashi, Y.; Takahashi, K.; Nishino, M.; Takeshige, R.

    2000-01-01

    The maintenance work management system supports the efficient drawing up of various documents for the maintenance work at nuclear power stations and the speeding up of the permission procedure. In addition, it improves the quality assurance of the safety and reliability of the maintenance work. Key merits of the system are: 1. Efficiently drawing up various documents for the maintenance work by using the stored data for the previous maintenance work and the pipe and instrument diagram (P and ID) data. 2. Supporting the management work for the completion of maintenance work safety by using the isolation information stored on the computer system. 3. Speeding up the permission procedure by electronic mail and electronic permission. 4. Displaying additional information such as the specifications of equipment, maintenance result, and maintenance plan by linking up with the database of another system. 5. Reducing the cost of hardware devices by using client/server network configurations of personal computers and a personal computer server. (author)

  13. DIRAC Data Management System

    CERN Document Server

    Smith, A C

    2007-01-01

    The LHCb experiment being built to utilize CERN’s flagship Large Hadron Collider will generate data to be analysed by a community of over 600 physicists worldwide. DIRAC, LHCb’s Workload and Data Management System, facilitates the use of underlying EGEE Grid resources to generate, process and analyse this data in the distributed environment. The Data Management System, presented here, provides real-time, data-driven distribution in accordance with LHCb’s Computing Model. The data volumes produced by the LHC experiments are unprecedented, rendering individual institutes and even countries, unable to provide the computing and storage resources required to make full use of the produced data. EGEE Grid resources allow the processing of LHCb data possible in a distributed fashion and LHCb’s Computing Model is based on this approach. Data Management in this environment requires reliable and high-throughput transfer of data, homogeneous access to storage resources and the cataloguing of data replicas, all of...

  14. DISEASE MANAGEMENT INFORMATION SYSTEM

    OpenAIRE

    Bens Pardamean; Anindito; Anjela Djoeang; Nana Tobing

    2013-01-01

    The study designed an information system model for Disease Management (DisMan) that met the specifications and needs of a consumer electronics manufacturer. The diseases monitored by this study were diabetes, hypertension and tuberculosis. Data were collected through interviews with the companyâs human resources department and occupational health provider. As for the model, literature and online research were conducted to collect health standards and information system standards on existing D...

  15. Integrated management systems

    DEFF Research Database (Denmark)

    Jørgensen, Tine Herreborg; Remmen, Arne; Mellado, M. Dolores

    2006-01-01

    Different approaches to integration of management systems (ISO 9001, ISO 14001, OHSAS 18001 and SA 8000) with various levels of ambition have emerged. The tendency of increased compatibility between these standards has paved the road for discussions of, how to understand the different aspects of ...

  16. Managing Complex Dynamical Systems

    Science.gov (United States)

    Cox, John C.; Webster, Robert L.; Curry, Jeanie A.; Hammond, Kevin L.

    2011-01-01

    Management commonly engages in a variety of research designed to provide insight into the motivation and relationships of individuals, departments, organizations, etc. This paper demonstrates how the application of concepts associated with the analysis of complex systems applied to such data sets can yield enhanced insights for managerial action.

  17. Visual management support system

    Science.gov (United States)

    Lee Anderson; Jerry Mosier; Geoffrey Chandler

    1979-01-01

    The Visual Management Support System (VMSS) is an extension of an existing computer program called VIEWIT, which has been extensively used by the U. S. Forest Service. The capabilities of this program lie in the rapid manipulation of large amounts of data, specifically opera-ting as a tool to overlay or merge one set of data with another. VMSS was conceived to...

  18. Advanced Distribution Management System

    OpenAIRE

    Avazov, Artur; Sobinova, Lubov Anatolievna

    2016-01-01

    This article describes the advisability of using advanced distribution management systems in the electricity distribution networks area and considers premises of implementing ADMS within the Smart Grid era. Also, it gives the big picture of ADMS and discusses the ADMS advantages and functionalities.

  19. Advanced Distribution Management System

    Science.gov (United States)

    Avazov, Artur R.; Sobinova, Liubov A.

    2016-02-01

    This article describes the advisability of using advanced distribution management systems in the electricity distribution networks area and considers premises of implementing ADMS within the Smart Grid era. Also, it gives the big picture of ADMS and discusses the ADMS advantages and functionalities.

  20. Advanced Distribution Management System

    Directory of Open Access Journals (Sweden)

    Avazov Artur R.

    2016-01-01

    Full Text Available This article describes the advisability of using advanced distribution management systems in the electricity distribution networks area and considers premises of implementing ADMS within the Smart Grid era. Also, it gives the big picture of ADMS and discusses the ADMS advantages and functionalities.

  1. ISO 9001 2000 : the quality management process

    CERN Document Server

    Tricker, Ray

    2006-01-01

    With the publication of ISO 9001:2000, there is now a single quality management ?requirements? standard that is applicable to all organisations, products and services. ISO 9001:2000 is the only standard that can be used for the certification of a QMS and its generic requirements can be used by any organisation.ISO 9001:2000 applies to all types or organisations. It is the quality standard which specifies the requirements of quality management systems for use where organisations need to demonstrate their capability to provide products and services which meet both customer needs and relevant reg

  2. Smart energy management system

    Science.gov (United States)

    Desai, Aniruddha; Singh, Jugdutt

    2010-04-01

    Peak and average energy usage in domestic and industrial environments is growing rapidly and absence of detailed energy consumption metrics is making systematic reduction of energy usage very difficult. Smart energy management system aims at providing a cost-effective solution for managing soaring energy consumption and its impact on green house gas emissions and climate change. The solution is based on seamless integration of existing wired and wireless communication technologies combined with smart context-aware software which offers a complete solution for automation of energy measurement and device control. The persuasive software presents users with easy-to-assimilate visual cues identifying problem areas and time periods and encourages a behavioural change to conserve energy. The system allows analysis of real-time/statistical consumption data with the ability to drill down into detailed analysis of power consumption, CO2 emissions and cost. The system generates intelligent projections and suggests potential methods (e.g. reducing standby, tuning heating/cooling temperature, etc.) of reducing energy consumption. The user interface is accessible using web enabled devices such as PDAs, PCs, etc. or using SMS, email, and instant messaging. Successful real-world trial of the system has demonstrated the potential to save 20 to 30% energy consumption on an average. Low cost of deployment and the ability to easily manage consumption from various web enabled devices offers gives this system a high penetration and impact capability offering a sustainable solution to act on climate change today.

  3. Air System Information Management

    Science.gov (United States)

    Filman, Robert E.

    2004-01-01

    I flew to Washington last week, a trip rich in distributed information management. Buying tickets, at the gate, in flight, landing and at the baggage claim, myriad messages about my reservation, the weather, our flight plans, gates, bags and so forth flew among a variety of travel agency, airline and Federal Aviation Administration (FAA) computers and personnel. By and large, each kind of information ran on a particular application, often specialized to own data formats and communications network. I went to Washington to attend an FAA meeting on System-Wide Information Management (SWIM) for the National Airspace System (NAS) (http://www.nasarchitecture.faa.gov/Tutorials/NAS101.cfm). NAS (and its information infrastructure, SWIM) is an attempt to bring greater regularity, efficiency and uniformity to the collection of stovepipe applications now used to manage air traffic. Current systems hold information about flight plans, flight trajectories, weather, air turbulence, current and forecast weather, radar summaries, hazardous condition warnings, airport and airspace capacity constraints, temporary flight restrictions, and so forth. Information moving among these stovepipe systems is usually mediated by people (for example, air traffic controllers) or single-purpose applications. People, whose intelligence is critical for difficult tasks and unusual circumstances, are not as efficient as computers for tasks that can be automated. Better information sharing can lead to higher system capacity, more efficient utilization and safer operations. Better information sharing through greater automation is possible though not necessarily easy.

  4. TFTR data management system

    International Nuclear Information System (INIS)

    Randerson, L.; Chu, J.; Ludescher, C.; Malsbury, J.; Stark, W.

    1986-01-01

    Developments in the tokamak fusion test reactor (TFTR) data management system supporting data management system supporting data acquisition and off-line physics data reduction are described. Data from monitor points, timing channels, and transient recorder channels and other devices are acquired and stored for use by on-line tasks. Files are transferred off-line automatically. A configuration utility determines data acquired and files transferred. An event system driven by file arrival activates off-line reduction processes. A post-run process transfers files not shipped during runs. Files are archived to tape and are retrievable by digraph and shot number. Automatic skimming based on most recent access, file type, shot numbers, and user-set protection maintains the files required for post-run data reduction

  5. Management Information Systems

    Directory of Open Access Journals (Sweden)

    Furduescu Bogdan-Alexandru

    2017-12-01

    Full Text Available Technology is the science that studies processes, methods and operations run or applied onto raw materials, matters or data, in order to obtain a certain product. Information is the material signal able to launch a material reaction of a dynamic auto-tuning system for which the system is conditioned and finalized. Information Technology is the technology needed for handling (procuring, processing, storing converting and transmitting information, in particular, with the use of computers [Longley, D. & Shain, M. (1985, p. 164]. The importance of IT in the economic growth and development is widely known, taking into account the impact that technology can have on the success and survival, or the failure of the economic activity of enterprises/organizations, IT offering various management information systems (MIS, executive and feedback segments, which all have important and beneficial implications in management and control.

  6. THE AUTONOMOUS MAINTENANCE IMPLEMENTATION DIRECTORY AS A STEP TOWARD THE INTELLIGENT QUALITY MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Michał MOLENDA

    2016-10-01

    Full Text Available The article describes the effects of the improvement of the production process which one of the industrial enterprises obtained by implementing the method of Autonomous Maintenance (AM, which is one of the pillars of the concept of Total Productive Maintenance (TPM. AM method was presented as an aid to the formation of intelligent, self-improving procesess of the quality management system (QMS. The main part of this article is to present results of studies that have been conducted in one of the large industrial enterprises in Poland, manufacturing for the automotive industry. The aim of the study was to evaluate the effectiveness of the implementation of the AM method as a tool for self-improvement of industrial processes in the following company. The study was conducted in 2015. The gathering and comparison of data from the period of two years, ie. the year before and the year after the implementation of AM, helped to determine the effectiveness of AM in building intelligent quality management system.

  7. The Autonomous Maintenance Implementation Directory as a Step Toward the Intelligent Quality Management System

    Science.gov (United States)

    Molenda, Michał

    2016-12-01

    The article describes the effects of the improvement of the production process which one of the industrial enterprises obtained by implementing the method of Autonomous Maintenance (AM), which is one of the pillars of the concept of Total Productive Maintenance (TPM). AM method was presented as an aid to the formation of intelligent, self-improving procesess of the quality management system (QMS). The main part of this article is to present results of studies that have been conducted in one of the large industrial enterprises in Poland, manufacturing for the automotive industry. The aim of the study was to evaluate the effectiveness of the implementation of the AM method as a tool for selfimprovement of industrial processes in the following company. The study was conducted in 2015. The gathering and comparison of data from the period of two years, ie. the year before and the year after the implementation of AM, helped to determine the effectiveness of AM in building intelligent quality management system.

  8. Managing Conflict in Temporary Management Systems

    Science.gov (United States)

    Wilemon, David L.

    1973-01-01

    As organizational tasks have grown more complex, several innovative temporary management systems such as matrix management have been developed. The Apollo space program has been an important contribution to the development of matrix management techniques. Discusses the role of conflict within the matrix, its determinants, and the process of…

  9. Mastering the management system.

    Science.gov (United States)

    Kaplan, Robert S; Norton, David P

    2008-01-01

    Companies have always found it hard to balance pressing operational concerns with long-term strategic priorities. The tension is critical: World-class processes won't lead to success without the right strategic direction, and the best strategy in the world will get nowhere without strong operations to execute it. In this article, Kaplan, of Harvard Business School, and Norton, founder and director of the Palladium Group, explain how to effectively manage both strategy and operations by linking them tightly in a closed-loop management system. The system comprises five stages, beginning with strategy development, which springs from a company's mission, vision, and value statements, and from an analysis of its strengths, weaknesses, and competitive environment. In the next stage, managers translate the strategy into objectives and initiatives with strategy maps, which organize objectives by themes, and balanced scorecards, which link objectives to performance metrics. Stage three involves creating an operational plan to accomplish the objectives and initiatives; it includes targeting process improvements and preparing sales, resource, and capacity plans and dynamic budgets. Managers then put plans into action, monitoring their effectiveness in stage four. They review operational, environmental, and competitive data; assess progress; and identify barriers to execution. In the final stage, they test the strategy, analyzing cost, profitability, and correlations between strategy and performance. If their underlying assumptions appear faulty, they update the strategy, beginning another loop. The authors present not only a comprehensive blueprint for successful strategy execution but also a managerial tool kit, illustrated with examples from HSBC Rail, Cigna Property and Casualty, and Store 24. The kit incorporates leading management experts' frameworks, outlining where they fit into the management cycle.

  10. Conformance on Quality Management System of One State College in the Philippines as Basis for ISO Certification

    Directory of Open Access Journals (Sweden)

    Romulo T. Sisno

    2017-11-01

    Full Text Available This study sought to determine the quality management system of the Northern Negros State College of Science and Technology (NONESCOST as basis for International Organization for Standardization (ISO Certification. The descriptive method of research was used in this study. It utilized the ISO 9001:2008 Quality Management System Requirements Checklist and the Questionnaires on the Attitudes towards ISO 9001. The study utilized a descriptive research design.. Findings revealed that the attitude of administrators, teaching personnel and administrative staff’ towards ISO 9001 in terms of benefits, challenges, recommendations and standards did not differ significantly. Findings further revealed that the employees have mostly positive perceptions of ISO 9001, resulting in positive attitudes in the workplace. Findings also revealed that the extent of conformance to the ISO 9001:2008 (QMS Requirements in the areas of Quality Management System, Management Responsibility, Resource Management, Product Realization and Measurement, Analysis and Improvement was perceived by the respondents to be minor non-conformance. It implies that fulfillment to the ISO 9001:2008 Requirements was only satisfactory

  11. Verification Account Management System (VAMS)

    Data.gov (United States)

    Social Security Administration — The Verification Account Management System (VAMS) is the centralized location for maintaining SSA's verification and data exchange accounts. VAMS account management...

  12. HLT configuration management system

    CERN Document Server

    Daponte, Vincenzo

    2015-01-01

    The CMS High Level Trigger (HLT) is implemented running a streamlined version of the CMS offline reconstruction software running on thousands of CPUs. The CMS software is written mostly in C++, using Python as its configuration language through an embedded CPython interpreter. The configuration of each process is made up of hundreds of modules, organized in sequences and paths. As an example, the HLT configurations used for 2011 data taking comprised over 2200 different modules, organized in more than 400 independent trigger paths. The complexity of the HLT configurations and the large number of configuration produced require the design of a suitable data management system. The present work describes the designed solution to manage the considerable number of configurations developed and to assist the editing of new configurations. The system is required to be remotely accessible and OS-independent as well as easly maintainable easy to use. To meet these requirements a three-layers architecture has been choose...

  13. Data Management System

    Science.gov (United States)

    1997-01-01

    CENTRA 2000 Inc., a wholly owned subsidiary of Auto-trol technology, obtained permission to use software originally developed at Johnson Space Center for the Space Shuttle and early Space Station projects. To support their enormous information-handling needs, a product data management, electronic document management and work-flow system was designed. Initially, just 33 database tables comprised the original software, which was later expanded to about 100 tables. This system, now called CENTRA 2000, is designed for quick implementation and supports the engineering process from preliminary design through release-to-production. CENTRA 2000 can also handle audit histories and provides a means to ensure new information is distributed. The product has 30 production sites worldwide.

  14. Environmental management systems

    OpenAIRE

    Misiak, Małgorzata

    2016-01-01

    Considering environmental protection requirements in business operations may, in the long run, determine if a lasting comparative advantage can be achieved. That is why our textbook, rich in case studies, identifies not only the threats a business may pose to the environment but stresses the ways of reducing its negative impact. It discusses, among other things, the concept of corporate social responsibility, environmental management systems, methods and the importance of eco-labelling goods ...

  15. Environmental Compliance Management System

    International Nuclear Information System (INIS)

    Brownson, L.W.; Krsul, T.; Peralta, R.A.; Knudson, D.A.; Rosignolo, C.L.

    1992-01-01

    Argonne National Laboratory (ANL) is developing the Environmental Compliance Management System (ECMS) as a comprehensive, cost-effective tool to ensure (1) that the Laboratory complies with all applicable federal and state environmental laws and regulations, (2) that environmental issues and concerns are recognized and considered in the early phases of projects; and (3) that Laboratory personnel conduct Laboratory operations in the most environmentally acceptable manner. The ECMS is an expert computer system which is designed to allow project engineers to perform an environmental evaluation of their projects. The system includes a Master Program which collects basic project information, provide utility functions, and access the environmental expert modules, environmental expert system modules for each federal and state environmental law which allows the user to obtain specific information on how an individual law may affect his project; and site-specific databases which contain information necessary for effective management of the site under environmental regulations. The ECMS will have the capability to complete and print many of the necessary environmental forms required by federal and state agencies, including the Department of Energy

  16. Simulator configuration management system

    International Nuclear Information System (INIS)

    Faulent, J.; Brooks, J.G.

    1990-01-01

    The proposed revisions to ANS 3.5-1985 (Section 5) require Utilities to establish a simulator Configuration Management System (CMS). The proposed CMS must be capable of: Establishing and maintaining a simulator design database. Identifying and documenting differences between the simulator and its reference plant. Tracking the resolution of identified differences. Recording data to support simulator certification, testing and maintenance. This paper discusses a CMS capable of meeting the proposed requirements contained in ANS 3.5. The system will utilize a personal computer and a relational database management software to construct a simulator design database. The database will contain records to all reference nuclear plant data used in designing the simulator, as well as records identifying all the software, hardware and documentation making up the simulator. Using the relational powers of the database management software, reports will be generated identifying the impact of reference plant changes on the operation of the simulator. These reports can then be evaluated in terms of training needs to determine if changes are required for the simulator. If a change is authorized, the CMS will track the change through to its resolution and then incorporate the change into the simulator design database

  17. Bank Customers Management System

    Directory of Open Access Journals (Sweden)

    Ebubeogu Amarachukwu Felix

    2015-08-01

    Full Text Available ABSTRACT The purpose of this project is in partial fulfilment of the requirements of Bachelor of Science Hon in Information Technology. The Design and development of this Bank customers Management system provides a more secured approach in managing bank customers information which strengthens the relationships between banks and their customers by providing the right solutions that uses a multi-level security to improve customer satisfaction. The technology used in developing this project is ASP.NET and the programming language used to develop this project is C and the IDE used is Microsoft Visual Studio 2013 professional in designing the front end while the back end uses Microsoft SQL Server 2012.

  18. Management Information Systems at CERN

    CERN Document Server

    Ferguson, J

    1986-01-01

    The specific areas addressed in the study are 1.Management decision support (data presentation, data base management systems â" DBMS, modeling) 2.Text processing, 3.Electronic communication for management purposes, 4.Office automation, 5.Administrative use of Management Information Systems (MIS) and in particular Administrative Data Processing (ADP).

  19. AN APPROACH TO THE QUALITY IMPROVEMENT OF A MASSIVE INVESTMENT PROJECT BY INTEGRATING ICT AND QMS

    Directory of Open Access Journals (Sweden)

    Tamara Gvozdenovic

    2007-12-01

    Full Text Available This work has presented an approach to the quality improvement of an investment project by the change in the concept of project management. Building time of the investment project is a complex factor which needs a special attention. It is well known that the PERT method has been applied with long-lasting investment projects, where a big time distance brings about significant uncertainty of future situations. Microsoft Project 2002 and Matlab: Neural Network Toolbox are the software tools used for solving the problem of investment project management.

  20. Pollution management system

    DEFF Research Database (Denmark)

    2015-01-01

    A pollution management system comprises an array of one or more inlets and at least one outlet. The one or more inlets are arranged to collect polluted air and supply said polluted air to a polluted air treatment element. The one or more inlets each comprise a respective inlet sensor for measuring...... a level of pollution at the inlet, and the at least one outlet comprises an outlet sensor for measuring a level of pollution at the outlet. The inlet sensors and the outlet sensor are arranged to provide feedback to the polluted air treatment element....

  1. The impact of SLMTA in improving laboratory quality systems in the Caribbean Region

    Directory of Open Access Journals (Sweden)

    Giselle Guevara

    2014-11-01

    Objective: To describe the impact of the Strengthening of Laboratory Management Toward Accreditation (SLMTA training programme and mentorship amongst five clinical laboratories in the Caribbean after 18 months. Method: Five national reference laboratories from four countries participated in the SLMTA programme that incorporated classroom teaching and implementation of improvement projects. Mentors were assigned to the laboratories to guide trainees on their improvement projects and to assist in the development of Quality Management Systems (QMS. Audits were conducted at baseline, six months, exit (at 12 months and post-SLMTA (at 18 months using the Stepwise Laboratory Quality Improvement Process Towards Accreditation (SLIPTA checklist to measure changes in implementation of the QMS during the period. At the end of each audit, a comprehensive implementation plan was developed in order to address gaps. Results: Baseline audit scores ranged from 19% to 52%, corresponding to 0 stars on the SLIPTA five-star scale. After 18 months, one laboratory reached four stars, two reached three stars and two reached two stars. There was a corresponding decrease in nonconformities and development of over 100 management and technical standard operating procedures in each of the five laboratories. Conclusion: The tremendous improvement in these five Caribbean laboratories shows that SLMTA coupled with mentorship is an effective, user-friendly, flexible and customisable approach to the implementation of laboratory QMS. It is recommended that other laboratories in the region consider using the SLMTA training programme as they engage in quality systems improvement and preparation for accreditation.

  2. Pembangunan Model Restaurant Management System

    OpenAIRE

    Fredy Jingga; Natalia Limantara

    2014-01-01

    Model design for Restaurant Management System aims to help in restaurant business process, where Restaurant Management System (RMS) help the waitress and chef could interact each other without paper limitation.  This Restaurant Management System Model develop using Agile Methodology and developed based on PHP Programming Langguage. The database management system is using MySQL. This web-based application model will enable the waitress and the chef to interact in realtime, from the time they a...

  3. Environmental management system

    International Nuclear Information System (INIS)

    2004-01-01

    An Environmental Management System was implemented in ANAV in 1999, including the two nuclear sites of the Asco and Vandellos II nuclear power plants. This implementation entailed formulation of the ANAV Environmental Policy, preparation of an Environmental Management Plan (PLAGMA) supported by the Environmental Aspects Manuals (MASMA) of each site and their operating procedures, modification of the organizational structure to create the Environment Unit, in charge of implementing the SIGEMA, and the Environment Committee, the governing body that reviews the results obtained and environmental goals to be achieved, and direct involvement of all the different ANAV organization in continuous improvement of the SIGEMA implementation. Special attention is paid to evolution of the environmental indicators, to communication and specific training in environmental issues, and to waste management and the different programs for increasing waste recycling and assessment, as well as to minimization programs. The article details the different approaches used to improve the environmental results in these last five years, which have allowed ANAV to maintain the ISO-14001 Certification since 1999. (Author)

  4. Implementing hospital quality assurance policies in Iran: balancing licensing, annual evaluation, inspections and quality management systems.

    Science.gov (United States)

    Aghaei Hashjin, Asgar; Delgoshaei, Bahram; Kringos, Dionne S; Tabibi, Seyed Jamaladin; Manouchehri, Jila; Klazinga, Niek S

    2015-01-01

    The purpose of this paper is to provide an overview of applied hospital quality assurance (QA) policies in Iran. A mixed method (quantitative data and qualitative document analysis) study was carried out between 1996 and 2010. The QA policy cycle forms a tight monitoring system to assure hospital quality by combining mandatory and voluntary methods in Iran. The licensing, annual evaluation and grading, and regulatory inspections statutorily implemented by the government as a national package to assure and improve hospital care quality, while implementing quality management systems (QMS) was voluntary for hospitals. The government's strong QA policy legislation role and support has been an important factor for successful QA implementation in Iran, though it may affected QA assessment independency and validity. Increased hospital evaluation independency and repositioning, updating standards, professional involvement and effectiveness studies could increase QA policy impact and maturity. The study highlights the current QA policy implementation cycle in Iranian hospitals. It provides a basis for further quality strategy development in Iranian hospitals and elsewhere. It also raises attention about finding the optimal balance between different QA policies, which is topical for many countries. This paper describes experiences when implementing a unique approach, combining mandatory and voluntary QA policies simultaneously in a developing country, which has invested considerably over time to improve hospital quality. The experiences with a mixed obligatory/voluntary approach and comprehensive policies in Iran may contain lessons for policy makers in developing and developed countries.

  5. Management information systems

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    This contract was for the development of a new range of colliery information computer systems (CIS) using a VAX 11/730 computer. The report details the selection of the system and the set-up of the hardware and software. The first application of these systems was to monitor production and delays from longwall faces. A trial installation was implemented at Shirebrook Colliery and this proved so successful that British Coal are now installing many similar systems. The key features of the production monitoring application are that delays are automatically detected in real time and the operator is prompted for the root cause of the delay. This is done through a linked series of questions and answere from a linked set of possible delay causes. Ad hoc and regular reports are produced giving local colliery management visibility of coal face performance, thus enabling informed decisions and corrective action to be taken. Following the successful application to production monitoring, the system was extended to heading/drivages, coal clearance/conveyors, mine air environment and fixed plant. Those applications were operational during the contract but have since been extended.

  6. TFTR data management system

    International Nuclear Information System (INIS)

    Randerson, L.; Chu, J.; Ludescher, C.; Malsbury, J.; Stark, W.

    1986-01-01

    Developments in the tokamak fusion test reactor (TFTR) data-management system supporting data acquisition and off-line physics data reduction are described. Data from monitor points, timing channels, transient recorder channels, and other devices are acquired and stored for use by on-line tasks. Files are transferred off line automatically. A configuration utility determines data acquired and files transferred. An event system driven by file arrival activates off-line reduction processes. A post-run process transfers files not shipped during runs. Files are archived to tape and are retrievable by digraph and shot number. Automatic skimming based on most recent access, file type, shot numbers, and user-set protections maintains the files required for post-run data reduction

  7. The impact of ISO 9001:2008 quality management system implementation on organizational performance of the Nuclear Regulatory Division of Philippine Nuclear Research Institute

    International Nuclear Information System (INIS)

    Borras, Alan M.

    2012-02-01

    This report aims to determine the perception of Nuclear Regulatory Division staff of the Phiippine Nuclear Research Institute on the implementation of ISO 9001-2008 Quality Management System in terms of the eight quality management principles, its effect to their process performance and its impact to NRD organizational performance. Likewise, it aims to determine if there are direct relationshops between the ISO-QMS implementation, the process performance, and organizational performance in terms of customers' satisfaction. Two survey instruments were used for quantitative data collection from two groups of respondents, i.e., the NRD staff for their perception and as internal customers and the licenses (holder of valid radioactive material license) as the external customers. All items were measured on a 4-point Likert Scale ranging from 1 as Strongly Disagree/Strongly Dissatisfied to 4 Strongly Agree/Strongly Satisfied. The data were analyzed statistically by means of Microsoft Ofice Excel and Statistical Analysis Software (SAS). Linear regression was used to test the hypotheses. The results show that the perception of the NRD staff are agreeable with the implementation of the ISO 9001:2008 in their organization which indicated 'customer focused' and 'process approach' as the strength of the practices while 'leadership' and 'mutually beneficial supplier relationship' as the weakest. Data on NRD staff perceptions of ISO 9001:2008 also show that QMS implementation has improved the effectiveness and efficiency of their core business processes which impacted on the organizational performance. The external customers rated 'competence', 'courtesy' and 'credibility' as the three highest attributes of NRD service quality which denote their full trust and confidence to NRD as a nuclear regulatory body. Meanwhile, the same external customers rated 'tangibles', 'reliability' and 'access' as the lowest attributes. Furthermore, the results also show a significant and strong

  8. System Security Management in SNMP

    OpenAIRE

    P. Deivendran; Dr. R. Dhanapal Ph.D

    2010-01-01

    We present a framework for managing system security, based on a SNMP Management Information Base (MIB), namely the System Security MIB (SSEC MIB), We have defined managed objects and completed the ASN.1 description of the MIB that embeds them. The related security management functions are mainly focused on monitoring external script execution for system security scanning and access control. The main goal of this work is to introduce the semantics and a standard interface that will allow the r...

  9. Web Based Project Management System

    OpenAIRE

    Aadamsoo, Anne-Mai

    2010-01-01

    To increase an efficiency of a product, nowadays many web development companies are using different project management systems. A company may run a number of projects at a time, and requires input from a number of individuals, or teams for a multi level development plan, whereby a good project management system is needed. Project management systems represent a rapidly growing technology in IT industry. As the number of users, who utilize project management applications continues to grow, w...

  10. Cryptographic Key Management System

    Energy Technology Data Exchange (ETDEWEB)

    No, author

    2014-02-21

    This report summarizes the outcome of U.S. Department of Energy (DOE) contract DE-OE0000543, requesting the design of a Cryptographic Key Management System (CKMS) for the secure management of cryptographic keys for the energy sector infrastructure. Prime contractor Sypris Electronics, in collaboration with Oak Ridge National Laboratories (ORNL), Electric Power Research Institute (EPRI), Valicore Technologies, and Purdue University's Center for Education and Research in Information Assurance and Security (CERIAS) and Smart Meter Integration Laboratory (SMIL), has designed, developed and evaluated the CKMS solution. We provide an overview of the project in Section 3, review the core contributions of all contractors in Section 4, and discuss bene ts to the DOE in Section 5. In Section 6 we describe the technical construction of the CKMS solution, and review its key contributions in Section 6.9. Section 7 describes the evaluation and demonstration of the CKMS solution in different environments. We summarize the key project objectives in Section 8, list publications resulting from the project in Section 9, and conclude with a discussion on commercialization in Section 10 and future work in Section 11.

  11. ENVIRONMENTAL MANAGEMENT SYSTEMS CERTIFICATION

    Directory of Open Access Journals (Sweden)

    Aniko Miler-Virc

    2012-12-01

    Full Text Available ISO 14001 prescribes the requirements for a system, not environmental performance itself. Similarly, certification is of the management system itself, not environmental performance. An audit is not conducted to ascertain whether your flue gas emissions are less than X part per million nitrous oxide or that your wastewater effluent contains less that Y milligrams of bacteria per litre. Consequently, the procces of auditing the system for compliance to the standard entails checking to see that all of the necessary components of a functioning system are present and working properly.           A company can have a complete and fully functional EMS as prescribed by ISO 14001 without being certified. As certification can add to the time and expense of EMS development, it is important for you to establish, in advance, whether certification is of net benefit to you. Although most companies that develop an EMS do in fact certify, there are cases where certification does not add immediate value. Certification is not always beneficial to small and medium sized companies. Certification is not always necessary for companies with one or two large clients with environmental demands who are satisfied that you have a functional EMS (second-party declaration. Whatever decision you make, it is important to remember that just as a driver′s licence does not automatically make you a good driver, ISO 14001 certification does not automatically make your company environmentally benign or ensure that you will continually improve environmental performance. The system is only as good as the people who operate it.

  12. Alarm management system

    International Nuclear Information System (INIS)

    Woods, D.D.; Elm, W.C.; Lipner, M.H.; Butterworth, G.E.; Easter, J.R.

    1989-01-01

    An alarm management system is described, comprising: a light water pressurized nuclear power plant; sensors coupled to the plant indicating the state of the plant; a sensor signal processor, operatively connected to the sensors, for producing state signals indicating the state of the sensors monitoring the power plant from the sensor signals and for combining the state signals using rule based algorithms to produce abnormality indication signals; a message processor, operatively connected to the sensor signal processor for receiving the abnormality indication signals; a spatially dedicated parallel display for each function, operatively connected to the message processor, for displaying the portion of the messages simultaneously; and a serial display, operatively connected to the message processor, for displaying the message in the queues in priority order within category within function upon request, the message processor outputting messages from the queue to the parallel display as display space becomes available on the parallel display due to an abnormality being resolved

  13. Managing Distributed Knowledge Systems

    DEFF Research Database (Denmark)

    Sørensen, Brian Vejrum; Gelbuda, Modestas

    2005-01-01

    . This paper contributes to the research on organizations as distributed knowledge systems by addressing two weaknesses of the social practice literature. Firstly, it downplays the importance of formal structure and organizational design and intervention efforts by key organizational members. Secondly, it does......The article argues that the growth of de novo knowledge-based organization depends on managing and coordinating increasingly growing and, therefore, distributed knowledge. Moreover, the growth in knowledge is often accompanied by an increasing organizational complexity, which is a result...... of integrating new people, building new units and adding activities to the existing organization. It is argued that knowledge is not a stable capacity that belongs to any actor alone, but that it is rather an ongoing social accomplishment, which is created and recreated as actors engage in mutual activities...

  14. TOTAL QUALITY MANAGEMENT SYSTEM (TQMS IN SMALL WINERY AND BAKERY IN CYPRUS. A CASE STUDY.

    Directory of Open Access Journals (Sweden)

    ANTONIS A. ZORPAS

    2012-06-01

    Full Text Available Quality of products and production affects the welfare, efficiency and competitiveness of the business entity. Total Quality Management System (TQMS represent the organizational structure of enterprise, application of methods, tools and processes used for the implantation, maintenance and improvement of activities and their outcomes as well as the organization takes all the necessary actions for its environmental performance and safety.The aim of the implementing TQMS in company is to create a good relation of employees to quality and safety as a fundamental category of the market economy and make them produce this quality and on the other and to provide good relationbetween SMEs and governmental authorities. QMS determine the prior characteristics of products, through which the company meets the identified needs of the market. The paper presents a case study of the implementation of aTQMS in small winery and bakery industry from Cyprus. The TQMS include the implementation of ISO 9001:2008, ISO 14001:2004 and ISO 22000:2005.

  15. Environmental management system in companies

    International Nuclear Information System (INIS)

    Bonanno, C.

    1995-01-01

    The environmental management system, as the whole coordinated initiatives 'environmental oriented' introduced by companies in their organization, is discussed. Strategic weight that companies have to be present at the environmental management system is enlisted. Finally, the new professional figures of environmental technicians and environmental manager is discussed

  16. Integrated Management Systems and Workflow-Based Electronic Document Management: An Empirical Study

    DEFF Research Database (Denmark)

    Pho, Hang Thu; Tambo, Torben

    2014-01-01

    trustworthiness. Social implications: IMS has a tendency to stay with professionals, e.g. line managers and QA/QC/QMS professionals. The EDMS line of discussion suggests a broader inclusion. Originality/value: Researching IMS as a technological implementation is giving a better platform of aligning the IMS...... (EDMS) is essential, especially at global enterprises where a large amount of documents generated by processes flows through different work cultures. However, there is no "one-size-fits-all" design for EDMS because it depends on organizations' needs, size and resource allocation. This article discusses...... the interrelation between EDMS and IMS in order to suggest a best practice. Design/methodology/approach: This article methodologically based upon a qualitative, interpretivistic, longitudinal empirical study in a wind turbine factory. Findings and Originality/value: IMS improvement and effectiveness has been...

  17. Systems management of facilities agreements

    International Nuclear Information System (INIS)

    Blundell, A.

    1998-01-01

    The various types of facilities agreements, the historical obstacles to implementation of agreement management systems and the new opportunities emerging as industry is beginning to make an effort to overcome these obstacles, are reviewed. Barriers to computerized agreement management systems (lack of consistency, lack of standards, scarcity of appropriate computer software) are discussed. Characteristic features of a model facilities agreement management system and the forces driving the changing attitudes towards such systems (e.g. mergers) are also described

  18. Manpower management information system /MIS/

    Science.gov (United States)

    Gravette, M. C.; King, W. L.

    1971-01-01

    System of programs capable of building and maintaining data bank provides all levels of management with regular manpower evaluation reports and data source for special management exercises on manpower.

  19. System management and quality assurance

    International Nuclear Information System (INIS)

    Sastry, A.M.

    1989-01-01

    This paper describes the principles of system management and shows the relationship to quality assurance. It discusses the need for balanced attention to all the project management controls required for project success

  20. Project management and Enterprise systems

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2006-01-01

    Implementing and Operating integrated Enterprise Systems are a multidimensional effort. It seriously challenges the IT supplier as well as the professional service provider client. The paper discuss these issues in a project management perspective. A framework for supporting project management...

  1. Informational system. Documents management

    Directory of Open Access Journals (Sweden)

    Vladut Iacob

    2009-12-01

    Full Text Available Productivity growing, as well as reducing of operational costs in a company can be achieved by adopting a document management solutions. Such application will allow management and structured and efficient transmission of information within the organization.

  2. New type radiation management system

    International Nuclear Information System (INIS)

    Mogi, Kenichi; Uranaka, Yasuo; Fujita, Kazuhiko

    2001-01-01

    The radiation management system is a system to carry out entrance and leaving room management of peoples into radiation management area, information management on radiation obtained from a radiation testing apparatus, and so on. New type radiation management system developed by the Mitsubishi Electric Corp. is designed by concepts of superior maintenance and system practice by using apparatus and its interface with standard specification, upgrading of processing response by separating exposure management processing from radiation monitoring processing on a computer, and a backup system not so as to lose its function by a single accident of the constructed computer. Therefore, the system is applied by the newest hardware, package software, and general use LAN, and can carry out a total system filled with requirements and functions for various radiation management of customers by preparing a basic system from radiation testing apparatus to entrance and leaving room management system. Here were described on outline of the new type management system, concept of the system, and functions of every testing apparatus. (G.K.)

  3. CEFR information management system solution

    International Nuclear Information System (INIS)

    Lu Fei; Zhao Jia'ning

    2011-01-01

    Based on finished information resources planning scheme for China sodium cooled experimental fast breeder reactor and the advanced information resources management solution concepts were applied, we got the building solution of CEFR information management systems. At the same time, the technical solutions of systems structures, logic structures, physical structures, development platforms and operation platforms for information resources management system in fast breeder reactors were developed, which provided programmatic introductions for development works in future. (authors)

  4. Environmental asset management: Risk management systems

    CSIR Research Space (South Africa)

    Naudé, Brian

    2017-07-01

    Full Text Available bnaude@csir.co.za Charl Petzer Council for Scientific and Industrial Research PO Box 395 Pretoria 0001 South Africa +2712 841 4292 CPetzer1@csir.co.za Copyright © 2017 by B Naudé, C Petzer. Published and used by INCOSE with permission.... Charl Petzer is registered professional engineer with 30 years of programme/project management as well as systems engineering experience in military and other environments. He has been the lead systems engineer, as well as programme manager on several...

  5. Army Healthcare Enterprise Management System

    National Research Council Canada - National Science Library

    2001-01-01

    .... The complaint alleged that the Army Healthcare Enterprise Management System was not properly competed, potential conflicts of interest existed, and possible contract performance problems existed...

  6. Managing Temporal Knowledge in Port Management Systems

    Directory of Open Access Journals (Sweden)

    Anita Gudelj

    2006-05-01

    Full Text Available Large ports need to deal with a number of disparate activities:the movement of ships, containers and other cargo, theloading and unloading of ships and containers, customs activities.As well as human resources, anchorages, channels, lighters,tugs, berths, warehouse and other storage spaces have to beallocated and released. The efficient management of a port involvesmanaging these activities and resources, managing theflows of money involved between the agents providing and usingthese resources, and providing management information.Many information systems will be involved.Many applications have to deal with a large amount of datawhich not only represent the perceived state of the real world atpresent, but also past and/or future states. These applicationsare not served adequately by today's computer managementand database systems. In particular, deletions and updates insuch systems have destructive semantics. This means that previousdatabase contents (representing previous perceived statesof the real world cannot be accessed anymore.A review of how define temporal data models, based ongeneralizing a non-temporal data model in to a temporal one toimprove port management is presented. This paper describes apractical experiment which supports managing temporal dataalong with the corresponding prototype implementations.

  7. Lighting system with thermal management system

    Science.gov (United States)

    Arik, Mehmet; Weaver, Stanton; Stecher, Thomas; Seeley, Charles; Kuenzler, Glenn; Wolfe, Jr., Charles; Utturkar, Yogen; Sharma, Rajdeep; Prabhakaran, Satish; Icoz, Tunc

    2013-05-07

    Lighting systems having unique configurations are provided. For instance, the lighting system may include a light source, a thermal management system and driver electronics, each contained within a housing structure. The light source is configured to provide illumination visible through an opening in the housing structure. The thermal management system is configured to provide an air flow, such as a unidirectional air flow, through the housing structure in order to cool the light source. The driver electronics are configured to provide power to each of the light source and the thermal management system.

  8. Managing organizational culture within a management system

    International Nuclear Information System (INIS)

    Comeau, L.; Watts, G.

    2009-01-01

    The Point Lepreau Generating Station (PLGS) is currently undergoing a major refurbishment of its nuclear reactor. At the same time, a small team is designing the organization that will operate the plant after refurbishment. This paper offers a high level overview of the Post-Refurbishment Organization (PRO) project and will focus primarily on the approach used to address organizational culture and human system dynamics. We will describe how various tools, used to assess organization culture, team performance, and individual self-understanding, are used collectively to place the right person in the right position. We will explain how the career system, Pathfinder, is used to integrate these tools to support a comprehensive model for organization design and development. Finally, we demonstrate how the management of organizational cultural and human system dynamics are integrated into the PLGS Integrated Management System. (author)

  9. Hospital managers need management information systems.

    Science.gov (United States)

    Davis, S; Freeman, J R

    1976-01-01

    A new hospital director seeking to bring his institution to the brink of solvency found himself with ten pounds of data but no "information"--at least, not the kind of information he could use as a basis for management decisions. What he needed was a system that would not only present data, but the meaning of the data. Such a system is the integrated MIS.

  10. An experimental maintenance management system.

    Science.gov (United States)

    1979-01-01

    The purpose of this study was to evaluate Virginia's maintenance management system and to recommend modifications directed at improving it. The study revealed that (1) the current system of allocating maintenance monies is based upon centerline milea...

  11. Cargo Data Management Demonstration System

    Science.gov (United States)

    1974-02-01

    Delays in receipt and creation of cargo documents are a problem in international trade. The work described demonstrates some of the advantages and capabilities of a computer-based cargo data management system. A demonstration system for data manageme...

  12. System analysis for radwaste management

    International Nuclear Information System (INIS)

    Lennemann, W.L.

    1987-01-01

    The most logical approach to evaluating radioactive waste management processes and their options is to consider radioactive waste management, handling, and disposal as a complete and complex system from the waste arisings to their disposition. The principal elements that should be considered or taken into account when making a decision involving one or more components of a radwaste management system essentially concern radiation doses or detriments- both radiological and industrial safety and both capital investments and operating costs. This paper discusses the system analysis of the low- and medium-level radioactive waste management

  13. Car insurance information management system

    OpenAIRE

    Sun, Yu

    2015-01-01

    A customer information system is a typical information management system. It involves three aspects, the backstage database establishment, the application development and the system maintenance. A car insurance information management system is based on browser/server structure. Microsoft SQL Server establishes the backstage database. Active Server Pages, from Microsoft as well is used as the interface layer. The objective of this thesis was to apply ASP to the dynamic storage of a web page...

  14. IT Asset Management System -

    Data.gov (United States)

    Department of Transportation — ITAMS provides a web frontend for the managing of all HW Assets lifecycle data purchased by ATO since 2006. In addition it contains much of our Enterprise SW license...

  15. Password Management Systems

    OpenAIRE

    Fiala, Lukáš

    2010-01-01

    The goal is to describe and compare password management utilities and applications for individuals or small teams. Examples of such applications are KeePass, Password Safe, CodeWallet Pro and eWallet. On-line password managers like LastPass or RoboForm are another group of applications. Support for synchronization, sharing passwords in a team or protection against keyloggers (when filling in automatically) may also be included in the criteria.

  16. Autonomously managed electrical power systems

    Science.gov (United States)

    Callis, Charles P.

    1986-01-01

    The electric power systems for future spacecraft such as the Space Station will necessarily be more sophisticated and will exhibit more nearly autonomous operation than earlier spacecraft. These new power systems will be more reliable and flexible than their predecessors offering greater utility to the users. Automation approaches implemented on various power system breadboards are investigated. These breadboards include the Hubble Space Telescope power system test bed, the Common Module Power Management and Distribution system breadboard, the Autonomusly Managed Power System (AMPS) breadboard, and the 20 kilohertz power system breadboard. Particular attention is given to the AMPS breadboard. Future plans for these breadboards including the employment of artificial intelligence techniques are addressed.

  17. UNA EXPERIENCIA EN LA IMPLEMENTACIÓN DEL SISTEMA DE GESTIÓN DE LA CALIDAD DE UNA EMPRESA DE SERVICIO / AN EXPERIENCE IN THE IMPLEMENTATION OF THE QUALITY MANAGEMENT SYSTEM IN A SERVICE ENTERPRISE

    Directory of Open Access Journals (Sweden)

    Ester Michelena-Fernández

    2011-03-01

    Full Text Available

    El presente artículo muestra un procedimiento para el rediseño e implementación parcial del Sistema de Gestión de la Calidad (SGC de una empresa de servicios. Para llevar a cabo este estudio, se propuso que el objetivo general estuviese encaminado a realizar un rediseño en el SGC con un enfoque a proceso, estableciendo las interrelaciones de las actividades y tareas, así como los procedimientos obligatorios, según establece la Norma ISO 9001-2008. Con el fin de lograr la realización y cumplimiento del objetivo propuesto, se pusieron en práctica métodos y técnicas de diseño y mejoramiento de procesos, como por ejemplo el análisis, síntesis y deducción; además de implementar las metodologías PHVA y MPE de Harrigton (1997 [1]. En la etapa inicial del estudio realizado, se detectó que en el sistema de gestión que utilizaba esta empresa se presentaban un gran número de no conformidades y no cumplía con los requerimientos de la Norma ISO 9001-2008, lo que estaba influyendo negativamente en la calidad de los servicios ofertados y la satisfacción de los requerimientos de los clientes, lo que demostró la necesidad del rediseño del SGC.

    Abstract

    This article presents a procedure for the redesign and partial implementation of the Quality Management System (QMS in a service enterprise. To carry out this study, it was suggested that the main purpose aimed at a redesign of the QMS taking into account a process approach, establishing the interrelation of activities and tasks, as well as mandatory procedures, as established by the ISO 9001-2008 Standard. In order to achieve the completion and implementation of the established purpose, methods and techniques of design and process improvement, such as analysis, synthesis, and deduction, were put into practice, in addition to the implementation of the PDCA methodology and MPE from Harrington (1997 [1]. In the initial stage of study of the management

  18. Intelligent Integrated System Health Management

    Science.gov (United States)

    Figueroa, Fernando

    2012-01-01

    Intelligent Integrated System Health Management (ISHM) is the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system (Management: storage, distribution, sharing, maintenance, processing, reasoning, and presentation). Presentation discusses: (1) ISHM Capability Development. (1a) ISHM Knowledge Model. (1b) Standards for ISHM Implementation. (1c) ISHM Domain Models (ISHM-DM's). (1d) Intelligent Sensors and Components. (2) ISHM in Systems Design, Engineering, and Integration. (3) Intelligent Control for ISHM-Enabled Systems

  19. Medical-Information-Management System

    Science.gov (United States)

    Alterescu, Sidney; Friedman, Carl A.; Frankowski, James W.

    1989-01-01

    Medical Information Management System (MIMS) computer program interactive, general-purpose software system for storage and retrieval of information. Offers immediate assistance where manipulation of large data bases required. User quickly and efficiently extracts, displays, and analyzes data. Used in management of medical data and handling all aspects of data related to care of patients. Other applications include management of data on occupational safety in public and private sectors, handling judicial information, systemizing purchasing and procurement systems, and analyses of cost structures of organizations. Written in Microsoft FORTRAN 77.

  20. Underground risk management information systems

    Energy Technology Data Exchange (ETDEWEB)

    Matsuyama, S.; Inoue, M.; Sakai, T.

    2006-03-15

    JCOAL has conducted Joint Research on an Underground Communication and Risk Management Information System with CSIRO of Australia under a commissioned study project for the promotion of coal use starting in fiscal 2002. The goal of this research project is the establishment of a new Safety System focusing on the comprehensive risk management information system by the name of Nexsys. The main components of the system are the Ethernet type underground communication system that represents the data communication base, and the risk management information system that permits risk analysis in real-time and provides decision support based on the collected data. The Nexsys is an open system and is a core element of the underground monitoring system. Using a vast amount of underground data, it is capable of accommodating a wide range of functions that were not available in the past. Because of it, it is possible to construct an advanced underground safety system. 14 figs., 4 tabs.

  1. Management systems in production operations

    International Nuclear Information System (INIS)

    Walters, K.B.; Henderson, G.

    1993-01-01

    The Cullen Enquiry into the Piper Alpha disaster in the U.K. North Sea recommended that an operator should formally present it's company Management System and demonstrate how safety is achieved throughout the life cycle of a platform, from design through operation to abandonment. Brunei Shell Petroleum has prepared a corporate level Safety Management System. As part of Safety Case work, the corporate system is being extended to include the development of specific Management Systems with particular emphasis on offshore production operations involving integrated oil and gas facilities. This paper will describe the development of Management Systems, which includes an intensive Business Process Analysis and will comment upon it's applicability and relationship to ISO 9000. The paper will further describe the applicability and benefits of Management Systems and offer guidance on required effort. The paper will conclude that development of structured Management Systems for safety critical business processes is worthwhile but prioritization of effort will be necessary. As such the full adoption of Management Systems will be directional in nature

  2. Integrating the radioactive waste management system into other management systems

    International Nuclear Information System (INIS)

    Silva, Ana Cristina Lourenco da; Nunes Neto, Carlos Antonio

    2007-01-01

    Radioactive waste management is to be included in the Integrated Management System (IMS) which pursues the continuous improvement of the company's quality, occupational safety and health, and environment protection processes. Radioactive waste management is based on the following aspects: optimization of human and material resources for execution of tasks, including the provision of a radiation protection supervisor to watch over the management of radioactive waste; improved documentation (management plan and procedures); optimization of operational levels for waste classification and release; maintenance of generation records and history through a database that facilitates traceability of information; implementation of radioactive waste segregation at source (source identification, monitoring and decontamination) activities intended to reduce the amount of radioactive waste; licensing of initial storage site for radioactive waste control and storage; employee awareness training on radioactive waste generation; identification and evaluation of emergency situations and response planning; implementation of preventive maintenance program for safety related items; development and application of new, advanced treatment methodologies or systems. These aspects are inherent in the concepts underlying quality management (establishment of administrative controls and performance indicators), environment protection (establishment of operational levels and controls for release), occupational health and safety (establishment of operational controls for exposure in emergency and routine situations and compliance with strict legal requirements and standards). It is noted that optimizing the addressed aspects of a radioactive waste management system further enhances the efficiency of the Integrated Management System for Quality, Environment, and Occupational Safety and Health. (author)

  3. Information systems for risk management

    OpenAIRE

    Michael S. Gibson

    1997-01-01

    Risk management information systems are designed to overcome the problem of aggregating data across diverse trading units. The design of an information system depends on the risk measurement methodology that a firm chooses. Inherent in the design of both a risk management information system and a risk measurement methodology is a tradeoff between the accuracy of the resulting measures of risk and the burden of computing them. Technical progress will make this tradeoff more favorable over time...

  4. Challenges in the implementation of a quality management system applied to radiometric analysis

    Energy Technology Data Exchange (ETDEWEB)

    Dias, Danila C.S.; Bonifacio, Rodrigo L.; Nascimento, Marcos R.L.; Silva, Nivaldo C. da; Taddei, Maria Helena T., E-mail: danilacdias@gmail.com [Comissao Nacional de Energia Nuclear (LAPOC/CNEN-MG), Pocos de Caldas, MG (Brazil). Laboratorio de Pocos de Caldas

    2015-07-01

    The concept of quality in laboratories has been well established as an essential factor in the search for reliable results. Since its first version published (1999), the ISO/IEC 17025 has been applied in the industrial and research fields, in a wide range of laboratorial analyses. However, the implementation of a Quality Management System still poses great challenges to institutions and companies. The purpose of this work is to expose the constraints related to the implementation of ISO/IEC 17025 applied to analytical assays of radionuclides, accomplished by studying the case of the Pocos de Caldas Laboratory of the Brazilian Commission for Nuclear Energy. In this lab, a project of accreditation of techniques involving determination of radionuclides in water, soil, sediment and food samples has been conducted since 2011. The challenges presented by this project arise from the administrative view, where the governmental nature of the institution translates into unlevelled availability resources and the organizational view, whereas QMS requires inevitable changes in the organizational culture. It is important to point out that when it comes to accreditation of analysis involving radioactive elements, many aspects must be treated carefully due to the their very particular nature. Among these concerns are the determination of analysis uncertainties, accessibility to international proficiency studies, international radioactive samples and CRM transportation, the study of parameters on the validation of analytical methods and the lack of documentation and specialized personnel regarding quality at radiometric measurements. Through an effective management system, the institution is overcoming these challenges, moving toward the ISO/IEC 17025 accreditation. (author)

  5. Challenges in the implementation of a quality management system applied to radiometric analysis

    International Nuclear Information System (INIS)

    Dias, Danila C.S.; Bonifacio, Rodrigo L.; Nascimento, Marcos R.L.; Silva, Nivaldo C. da; Taddei, Maria Helena T.

    2015-01-01

    The concept of quality in laboratories has been well established as an essential factor in the search for reliable results. Since its first version published (1999), the ISO/IEC 17025 has been applied in the industrial and research fields, in a wide range of laboratorial analyses. However, the implementation of a Quality Management System still poses great challenges to institutions and companies. The purpose of this work is to expose the constraints related to the implementation of ISO/IEC 17025 applied to analytical assays of radionuclides, accomplished by studying the case of the Pocos de Caldas Laboratory of the Brazilian Commission for Nuclear Energy. In this lab, a project of accreditation of techniques involving determination of radionuclides in water, soil, sediment and food samples has been conducted since 2011. The challenges presented by this project arise from the administrative view, where the governmental nature of the institution translates into unlevelled availability resources and the organizational view, whereas QMS requires inevitable changes in the organizational culture. It is important to point out that when it comes to accreditation of analysis involving radioactive elements, many aspects must be treated carefully due to the their very particular nature. Among these concerns are the determination of analysis uncertainties, accessibility to international proficiency studies, international radioactive samples and CRM transportation, the study of parameters on the validation of analytical methods and the lack of documentation and specialized personnel regarding quality at radiometric measurements. Through an effective management system, the institution is overcoming these challenges, moving toward the ISO/IEC 17025 accreditation. (author)

  6. Energy management systems in buildings

    Energy Technology Data Exchange (ETDEWEB)

    Lush, D. M.

    1979-07-01

    An investigation is made of the range of possibilities available from three types of systems (automatic control devices, building envelope, and the occupants) in buildings. The following subjects are discussed: general (buildings, design and personnel); new buildings (envelope, designers, energy and load calculations, plant design, general design parameters); existing buildings (conservation measures, general energy management, air conditioned buildings, industrial buildings); man and motivation (general, energy management and documentation, maintenance, motivation); automatic energy management systems (thermostatic controls, optimized plant start up, air conditioned and industrial buildings, building automatic systems). (MCW)

  7. Evaluating a Skills Management System

    International Nuclear Information System (INIS)

    Largier, A.

    2013-01-01

    In order to anticipate the large number of people due to retire in the next few years, and to optimize the workforce contribution, IRSN (Institute for radiation protection and nuclear safety) is setting up skill management. This poster presents the IRSN's skill management system. The skill management system is based on a 4 step approach: -) identifying and listing the necessary skills, -) assessing the skills available, -) defining and setting up solutions: training, recruitment, out-sourcing), and -) feedback about the efficiency of the system. It appears that it is important to take into account the way the organization considers individual ability in order to favour collective proficiency

  8. HTR-10 management information system

    International Nuclear Information System (INIS)

    Liu Ruoxiao; Wu Zhongwang; Xi Shuren

    2000-01-01

    The HTR-10 Management information system (REMIS) strengthens the managerial level and usage of the information of HTR-10, thereby enhances the ability and efficiency of the design and management work. REMIS is designed based on the Client/Server framework. Database management system is SQL Server 6.5 for NT, While the client side is developed by Borland C ++ Builder, and it is based on Windows 95/98. The network protocol is TCP/IP. REMIS collects date of the HTR-10 at four parameters: Reactor properties, Design parameters, Equipment properties Reactor system flow charts. Final discussing extended prospect of REMIS

  9. The CMS workload management system

    Energy Technology Data Exchange (ETDEWEB)

    Cinquilli, M. [CERN; Evans, D. [Fermilab; Foulkes, S. [Fermilab; Hufnagel, D. [Fermilab; Mascheroni, M. [CERN; Norman, M. [UC, San Diego; Maxa, Z. [Caltech; Melo, A. [Vanderbilt U.; Metson, S. [Bristol U.; Riahi, H. [INFN, Perugia; Ryu, S. [Fermilab; Spiga, D. [CERN; Vaandering, E. [Fermilab; Wakefield, Stuart [Imperial Coll., London; Wilkinson, R. [Caltech

    2012-01-01

    CMS has started the process of rolling out a new workload management system. This system is currently used for reprocessing and Monte Carlo production with tests under way using it for user analysis. It was decided to combine, as much as possible, the production/processing, analysis and T0 codebases so as to reduce duplicated functionality and make best use of limited developer and testing resources. This system now includes central request submission and management (Request Manager), a task queue for parcelling up and distributing work (WorkQueue) and agents which process requests by interfacing with disparate batch and storage resources (WMAgent).

  10. The CMS workload management system

    International Nuclear Information System (INIS)

    Cinquilli, M; Mascheroni, M; Spiga, D; Evans, D; Foulkes, S; Hufnagel, D; Ryu, S; Vaandering, E; Norman, M; Maxa, Z; Wilkinson, R; Melo, A; Metson, S; Riahi, H; Wakefield, S

    2012-01-01

    CMS has started the process of rolling out a new workload management system. This system is currently used for reprocessing and Monte Carlo production with tests under way using it for user analysis. It was decided to combine, as much as possible, the production/processing, analysis and T0 codebases so as to reduce duplicated functionality and make best use of limited developer and testing resources. This system now includes central request submission and management (Request Manager); a task queue for parcelling up and distributing work (WorkQueue) and agents which process requests by interfacing with disparate batch and storage resources (WMAgent).

  11. Customer relationship management system

    OpenAIRE

    Selenis, Laimonas

    2004-01-01

    Customer Relationship Management (CRM) is one of the biggest problems for many companies today. By analyzing history records (profiles) of its customers, organization can effectively adapt its business activity to users needs and create better products and services. Proper analysis of customer profiles can help to predict the behaviour of the customers. After grouping customer profiles by similar attributes, company can easier handle its interactions with similar users. Such group profiling c...

  12. Management systems for regulatory authorities

    International Nuclear Information System (INIS)

    Mpandanyama, Rujeko Lynette

    2015-02-01

    For a regulatory body to fulfil its statutory obligations, there is need to develop and implement a regulatory management system that has the necessary arrangements for achieving and maintaining high quality performance in regulating the safety of nuclear and radiation facilities under its authority. Hence, the regulatory management system needs to fully integrate the human resources, processes and physical resources of the organization. This study sought to provide an understanding of the concept, principles, policies and fundamentals of management systems as they relate to regulatory systems in the field of radiation protection and to make appropriate recommendations to ensure that an effective management system exists for the control of ionizing radiation and radiation sources and addresses all relevant stakeholders in Zimbabwe. A comparative analysis was done on the current management status and the ideal management system, which led to the identification of the gaps existing. The main key that was found to be of significance was lack of linkages between processes and management tools within the institution. (au)

  13. INTEGRATION OF ENVIRONMENTAL MANAGEMENT SYSTEM

    OpenAIRE

    Tomescu Ada Mirela

    2012-01-01

    The relevance of management as significant factor of business activity can be established on various management systems. These will help to obtain, organise, administrate, evaluate and control particulars: information, quality, environmental protection, health and safety, various resources (time, human, finance, inventory etc). The complexity of nowadays days development, forced us to think ‘integrated’. Sustainable development principles require that environment management policies and p...

  14. Information Security Management System toolkit

    OpenAIRE

    Καραμανλής, Μάνος; Karamanlis, Manos

    2016-01-01

    Secure management of information is becoming critical for any organization because information is one of the most valuable assets in organization’s business operations. An Information security management system (ISMS) consists of the policies, procedures, guidelines, and associated resources and activities, collectively managed by an organization, in the pursuit of protecting its information assets. An ISMS is a systematic approach for establishing, implementing, operating, mon...

  15. Quality management systems in radiology

    Directory of Open Access Journals (Sweden)

    Geoffrey K. Korir

    2013-08-01

    Objective: To assess the level of quality management systems in X-ray medical facilities in Kenya. Methods: Quality management inspection, quality control performance tests and patient radiation exposure were assessed in 54 representative X-ray medical facilities. Additionally, a survey of X-ray examination frequency was conducted in 140 hospitals across the country. Results: The overall findings placed the country’s X-ray imaging quality management systems at 61±3% out of a possible 100%. The most and the least quality assurance performance indicators were general radiography X-ray equipment quality control tests at 88±4%, and the interventional cardiology adult examinations below diagnostic reference level at 25±1%, respectively. Conclusions: The study used a systematic evidence-based approach for the assessment of national quality management systems in radiological practice in clinical application, technical conduct of the procedure, image quality criteria, and patient characteristics as part of the quality management programme.

  16. Management system of instrument database

    International Nuclear Information System (INIS)

    Zhang Xin

    1997-01-01

    The author introduces a management system of instrument database. This system has been developed using with Foxpro on network. The system has some characters such as clear structure, easy operation, flexible and convenient query, as well as the data safety and reliability

  17. Impact of error management culture on knowledge performance in professional service firms

    Directory of Open Access Journals (Sweden)

    Tabea Scheel

    2014-01-01

    Full Text Available Knowledge is the most crucial resource of the 21st century. For professional service firms (PSFs, knowledge represents the input as well as the output, and thus the fundamental base for performance. As every organization, PSFs have to deal with errors – and how they do that indicates their error culture. Considering the positive potential of errors (e.g., innovation, error management culture is positively related to organizational performance. This longitudinal quantitative study investigates the impact of error management culture on knowledge performance in four waves. The study was conducted in 131 PSFs, i.e. tax accounting offices. As a standard quality management system (QMS was assumed to moderate the relationship between error management culture and knowledge performance, offices' ISO 9000 certification was assessed. Error management culture correlated positively with knowledge performance at a significant level and predicted knowledge performance one year later. While the ISO 9000 certification correlated positively with knowledge performance, its assumed moderation of the relationship between error management culture and knowledge performance was not consistent. The process-oriented QMS seems to function as facilitator for the more behavior-oriented error management culture. However, the benefit of ISO 9000 certification for tax accounting remains to be proven. Given the impact of error management culture on knowledge performance, PSFs should focus on actively promoting positive attitudes towards errors.

  18. Nuclear database management systems

    International Nuclear Information System (INIS)

    Stone, C.; Sutton, R.

    1996-01-01

    The authors are developing software tools for accessing and visualizing nuclear data. MacNuclide was the first software application produced by their group. This application incorporates novel database management and visualization tools into an intuitive interface. The nuclide chart is used to access properties and to display results of searches. Selecting a nuclide in the chart displays a level scheme with tables of basic, radioactive decay, and other properties. All level schemes are interactive, allowing the user to modify the display, move between nuclides, and display entire daughter decay chains

  19. Army Healthcare Enterprise Management System

    National Research Council Canada - National Science Library

    2001-01-01

    ... to buy the Enterprise Management System. The Information Technology Business Center provides information technology services to Fort Sam Houston tenants which include the Army Medical Command and the Army Medical Department Center and School...

  20. Fault management and systems knowledge

    Science.gov (United States)

    2016-12-01

    Pilots are asked to manage faults during flight operations. This leads to the training question of the type and depth of system knowledge required to respond to these faults. Based on discussions with multiple airline operators, there is agreement th...

  1. Congestion Management System Process Report

    Science.gov (United States)

    1996-03-01

    In January 1995, the Indianapolis Metropolitan Planning Organization with the help of an interagency Study Review Committee began the process of developing a Congestion Management System (CMS) Plan resulting in this report. This report documents the ...

  2. Introducing Managers to Expert Systems.

    Science.gov (United States)

    Finlay, Paul N.; And Others

    1991-01-01

    Describes a short course to expose managers to expert systems, consisting of (1) introductory lecture; (2) supervised computer tutorial; (3) lecture and discussion about knowledge structuring and modeling; and (4) small group work on a case study using computers. (SK)

  3. Pembangunan Model Restaurant Management System

    Directory of Open Access Journals (Sweden)

    Fredy Jingga

    2014-12-01

    Full Text Available Model design for Restaurant Management System aims to help in restaurant business process, where Restaurant Management System (RMS help the waitress and chef could interact each other without paper limitation.  This Restaurant Management System Model develop using Agile Methodology and developed based on PHP Programming Langguage. The database management system is using MySQL. This web-based application model will enable the waitress and the chef to interact in realtime, from the time they accept the customer order until the chef could know what to cook and checklist for the waitress wheter the order is fullfill or not, until the cahsier that will calculate the bill and the payment that they accep from the customer.

  4. System Wide Information Management (SWIM)

    Science.gov (United States)

    Hritz, Mike; McGowan, Shirley; Ramos, Cal

    2004-01-01

    This viewgraph presentation lists questions regarding the implementation of System Wide Information Management (SWIM). Some of the questions concern policy issues and strategies, technology issues and strategies, or transition issues and strategies.

  5. Electronic Resource Management Systems

    Directory of Open Access Journals (Sweden)

    Mark Ellingsen

    2004-10-01

    Full Text Available Computer applications which deal with electronic resource management (ERM are quite a recent development. They have grown out of the need to manage the burgeoning number of electronic resources particularly electronic journals. Typically, in the early years of e-journal acquisition, library staff provided an easy means of accessing these journals by providing an alphabetical list on a web page. Some went as far as categorising the e-journals by subject and then grouping the journals either on a single web page or by using multiple pages. It didn't take long before it was recognised that it would be more efficient to dynamically generate the pages from a database rather than to continually edit the pages manually. Of course, once the descriptive metadata for an electronic journal was held within a database the next logical step was to provide administrative forms whereby that metadata could be manipulated. This in turn led to demands for incorporating more information and more functionality into the developing application.

  6. RIMS: Resource Information Management System

    Science.gov (United States)

    Symes, J.

    1983-01-01

    An overview is given of the capabilities and functions of the resource management system (RIMS). It is a simple interactive DMS tool which allows users to build, modify, and maintain data management applications. The RIMS minimizes programmer support required to develop/maintain small data base applications. The RIMS also assists in bringing the United Information Services (UIS) budget system work inhouse. Information is also given on the relationship between the RIMS and the user community.

  7. CLASSIFICATION OF LEARNING MANAGEMENT SYSTEMS

    Directory of Open Access Journals (Sweden)

    Yu. B. Popova

    2016-01-01

    Full Text Available Using of information technologies and, in particular, learning management systems, increases opportunities of teachers and students in reaching their goals in education. Such systems provide learning content, help organize and monitor training, collect progress statistics and take into account the individual characteristics of each user. Currently, there is a huge inventory of both paid and free systems are physically located both on college servers and in the cloud, offering different features sets of different licensing scheme and the cost. This creates the problem of choosing the best system. This problem is partly due to the lack of comprehensive classification of such systems. Analysis of more than 30 of the most common now automated learning management systems has shown that a classification of such systems should be carried out according to certain criteria, under which the same type of system can be considered. As classification features offered by the author are: cost, functionality, modularity, keeping the customer’s requirements, the integration of content, the physical location of a system, adaptability training. Considering the learning management system within these classifications and taking into account the current trends of their development, it is possible to identify the main requirements to them: functionality, reliability, ease of use, low cost, support for SCORM standard or Tin Can API, modularity and adaptability. According to the requirements at the Software Department of FITR BNTU under the guidance of the author since 2009 take place the development, the use and continuous improvement of their own learning management system.

  8. Automated Maintenance Management System -

    Data.gov (United States)

    Department of Transportation — To achieve the to-be state of a modernized supply chain infrastructure and the NextGen Mission Service Requirements, the System Information Modernization initiative...

  9. Impact Management System

    Data.gov (United States)

    US Agency for International Development — IMS (developed w/Iraq mission) is a system for conducting quality portfolio impact analysis, linking projects to strategy through integration of context data. IMS...

  10. THE IMPACT OF MASS CUSTOMISATION ON THE QUALITY MANAGEMENT SYSTEM IN A SALES AND MARKETING ENVIRONMENT – A CASE STUDY

    Directory of Open Access Journals (Sweden)

    F.J. Joubert

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: The introduction of a vehicle platform destined for world-wide export brought mass customi-sation to the South African subsidiary of a German luxury car manufacturer. This, together with a 29% head count reduction, a model range increase, stringent profitability targets and increased customer satisfaction demands, made the previous, unintegrated quality systems used in the Sales and Marketing Division obsolete. A quality management system (QMS based on ISO 9002 was implemented. To solve some of the problems in the mass customisa-tion process, the principles of customer satisfaction and the measurement of internal processes were used to make recommendations for operational improvements.

    AFRIKAANSE OPSOMMING: Die produksie van voertuie wat in groot volumes wêreldwyd uitgevoer word, het bou-volgens-bestelling na die Suid-Afrikaanse filiaal van ‘n Duitse luukse voertuigvervaardiger gebring. Tesame met ‘n 29% personeelvermindering, ‘n verhoging in die getal beskikbare modelle, streng winsgewendheidsdoelwitte en verhoogde kliëntetevredenheidvereistes, het dit die vorige, ongeïntegreerde kwaliteitstelsels in die Verkope-en-Bemarkingsafdeling in on-bruik laat verval. ‘n Kwaliteitsbestuurstelsel gebaseer op ISO 9002 is geïmplementeer. Die beginsels van kliëntetevredenheid en die meting van falings in interne prosesse word gebruik om verbeteringsvoorstelle te doen om sodoende bedryfsbestuur te verbeter.

  11. Management Information Systems

    OpenAIRE

    Furduescu Bogdan-Alexandru

    2017-01-01

    Technology is the science that studies processes, methods and operations run or applied onto raw materials, matters or data, in order to obtain a certain product. Information is the material signal able to launch a material reaction of a dynamic auto-tuning system for which the system is conditioned and finalized. Information Technology is the technology needed for handling (procuring, processing, storing converting and transmitting) information, in particular, with the use of computers [Long...

  12. Evaluating safety management system implementation

    International Nuclear Information System (INIS)

    Preuss, M.

    2009-01-01

    Canada is committed to not only maintaining, but also improving upon our record of having one of the safest aviation systems in the world. The development, implementation and maintenance of safety management systems is a significant step towards improving safety performance. Canada is considered a world leader in this area and we are fully engaged in implementation. By integrating risk management systems and business practices, the aviation industry stands to gain better safety performance with less regulatory intervention. These are important steps towards improving safety and enhancing the public's confidence in the safety of Canada's aviation system. (author)

  13. Device configuration-management system

    International Nuclear Information System (INIS)

    Nowell, D.M.

    1981-01-01

    The Fusion Chamber System, a major component of the Magnetic Fusion Test Facility, contains several hundred devices which report status to the Supervisory Control and Diagnostic System for control and monitoring purposes. To manage the large number of diversity of devices represented, a device configuration management system was required and developed. Key components of this software tool include the MFTF Data Base; a configuration editor; and a tree structure defining the relationships between the subsystem devices. This paper will describe how the configuration system easily accomodates recognizing new devices, restructuring existing devices, and modifying device profile information

  14. Site systems engineering: Systems engineering management plan

    Energy Technology Data Exchange (ETDEWEB)

    Grygiel, M.L. [Westinghouse Hanford Co., Richland, WA (United States)

    1996-05-03

    The Site Systems Engineering Management Plan (SEMP) is the Westinghouse Hanford Company (WHC) implementation document for the Hanford Site Systems Engineering Policy, (RLPD 430.1) and Systems Engineering Criteria Document and Implementing Directive, (RLID 430.1). These documents define the US Department of Energy (DOE), Richland Operations Office (RL) processes and products to be used at Hanford to implement the systems engineering process at the site level. This SEMP describes the products being provided by the site systems engineering activity in fiscal year (FY) 1996 and the associated schedule. It also includes the procedural approach being taken by the site level systems engineering activity in the development of these products and the intended uses for the products in the integrated planning process in response to the DOE policy and implementing directives. The scope of the systems engineering process is to define a set of activities and products to be used at the site level during FY 1996 or until the successful Project Hanford Management Contractor (PHMC) is onsite as a result of contract award from Request For Proposal DE-RP06-96RL13200. Following installation of the new contractor, a long-term set of systems engineering procedures and products will be defined for management of the Hanford Project. The extent to which each project applies the systems engineering process and the specific tools used are determined by the project`s management.

  15. Interconnecting heterogeneous database management systems

    Science.gov (United States)

    Gligor, V. D.; Luckenbaugh, G. L.

    1984-01-01

    It is pointed out that there is still a great need for the development of improved communication between remote, heterogeneous database management systems (DBMS). Problems regarding the effective communication between distributed DBMSs are primarily related to significant differences between local data managers, local data models and representations, and local transaction managers. A system of interconnected DBMSs which exhibit such differences is called a network of distributed, heterogeneous DBMSs. In order to achieve effective interconnection of remote, heterogeneous DBMSs, the users must have uniform, integrated access to the different DBMs. The present investigation is mainly concerned with an analysis of the existing approaches to interconnecting heterogeneous DBMSs, taking into account four experimental DBMS projects.

  16. Emergency management information system (EMINS)

    International Nuclear Information System (INIS)

    Desonier, L.M.

    1987-01-01

    In a time of crisis or in an emergency, a manager is required to make many decisions to facilitate the proper solution and conclusion to the emergency or crisis. In order to make these decisions, it is necessary for the manager to have correct up-to-date information on the situation, which calls for an automated information display and entry process. The information handling needs are identified in terms of data, video, and voice. Studies of existing Emergency Operations Centers and evaluations of hardware and software have been completed. The result of these studies and investigations is the design and implementation of an automated Emergency Management Information System. Not only is the system useful for Emergency Management but for any information management requirement

  17. Management information systems. [United Kingdom

    Energy Technology Data Exchange (ETDEWEB)

    Hartley, D.; Spence, A.C.

    1985-02-01

    The successful application in the United Kingdom of the real time monitoring and control systems (MINOS) for underground mining operations, particularly in coal transport and the development of coalface monitoring (FIDO) in 1980 led naturally to the design of an operational data base for management. A User Group of experienced colliery managers produced a Management Information System (MIS) requirements specification and began the evolution of the systems of today. Twenty-four mines operate MIS in different ways from total dependency to a means of checking their manual reporting system. MIS collects useful data from all the major MINOS applications and provides a means of manually inputting other, relevant information. A wide variety of displays and reports are available to management, adjusted to meet individual requirements. The benefits from the use of MIS are difficult to quantify, since they become part of the management process. Further developments are taking place based on operational experience and requirements and taking advantage of the recent advances in computer technology. MIS is the modern management tool in British coal mining, collecting, storing, analysing and presenting accurate information upon which management decision making is based.

  18. Systems Engineering Management Procedures

    Science.gov (United States)

    1966-03-10

    hls -iii-rit. -miiiirme 4 --tandnirdized hle iil*ri oa;iu ’ -enperfrm)a- -yýfefi ~lall uitm l--im eniai~ atar n which will lumPremiiieuiea -. v-imli m...with standard component/part selection. and de- tile total system requirements stated in the Sys- tailed functional and physical interfaces: eval- tern...system survivability requirAent. As physical , interface, time, environment, use of these facility requirements are bei developed, standard perts; and

  19. Disposal Site Information Management System

    International Nuclear Information System (INIS)

    Larson, R.A.; Jouse, C.A.; Esparza, V.

    1986-01-01

    An information management system for low-level waste shipped for disposal has been developed for the Nuclear Regulatory Commission (NRC). The Disposal Site Information Management System (DSIMS) was developed to provide a user friendly computerized system, accessible through NRC on a nationwide network, for persons needing information to facilitate management decisions. This system has been developed on NOMAD VP/CSS, and the data obtained from the operators of commercial disposal sites are transferred to DSIMS semiannually. Capabilities are provided in DSIMS to allow the user to select and sort data for use in analysis and reporting low-level waste. The system also provides means for describing sources and quantities of low-level waste exceeding the limits of NRC 10 CFR Part 61 Class C. Information contained in DSIMS is intended to aid in future waste projections and economic analysis for new disposal sites

  20. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  1. Environmental management: A system approach

    Science.gov (United States)

    Petak, William J.

    1981-05-01

    This paper presents a system framework whose purpose is to improve understanding of environmental management. By analyzing the links between elements of the environmental management system, it is possible to construct a model that aids thinking systematically about the decision-making subsystem, and other subsystems, of the entire environmental management system. Through a multidisciplinary environmental approach, each of the individual subsystems is able to adapt to threats and opportunities. The fields of government, market economics, social responsibility and ecology, for example, are so complex that it is extremely difficult to develop a framework that gives full consideration to all aspects. This paper, through the application of a highly idealized system framework, attempts to show the general relationships that exist between complex system elements.

  2. Management systems for service providers

    International Nuclear Information System (INIS)

    Bolokonya, Herbert Chiwalo

    2015-02-01

    In the field of radiation safety and protection there are a number of institutions that are involved in achieving different goals and strategies. These strategies and objectives are achieved based on a number of tools and systems, one of these tools and systems is the use of a management system. This study aimed at reviewing the management system concept for Technical Service Providers in the field of radiation safety and protection. The main focus was on personal monitoring services provided by personal dosimetry laboratories. A number of key issues were found to be prominent to make the management system efficient. These are laboratory accreditation, approval; having a customer driven operating criteria; and controlling of records and good reporting. (au)

  3. Implementation of integrated management system

    International Nuclear Information System (INIS)

    Gaspar Junior, Joao Carlos A.; Fonseca, Victor Zidan da

    2007-01-01

    In present day exist quality assurance system, environment, occupational health and safety such as ISO9001, ISO14001 and OHSAS18001 and others standards will can create. These standards can be implemented and certified they guarantee one record system, quality assurance, documents control, operational control, responsibility definition, training, preparing and serve to emergency, monitoring, internal audit, corrective action, continual improvement, prevent of pollution, write procedure, reduce costs, impact assessment, risk assessment , standard, decree, legal requirements of municipal, state, federal and local scope. These procedure and systems when isolate applied cause many management systems and bureaucracy. Integration Management System reduce to bureaucracy, excess of documents, documents storage and conflict documents and easy to others standards implementation in future. The Integrated Management System (IMS) will be implemented in 2007. INB created a management group for implementation, this group decides planing, works, policy and advertisement. Legal requirements were surveyed, internal audits, pre-audits and audits were realized. INB is partially in accordance with ISO14001, OSHAS18001 standards. But very soon, it will be totally in accordance with this norms. Many studies and works were contracted to deal with legal requirements. This work have intention of show implementation process of ISO14001, OHSAS18001 and Integrated Management System on INB. (author)

  4. The JCMT Telescope Management System

    Science.gov (United States)

    Tilanus, Remo P. J.; Jenness, Tim; Economou, Frossie; Cockayne, Steve

    Established telescopes often face a challenge when trying to incorporate new software standards and utilities into their existing real-time control system. At the JCMT we have successfully added important new features such as a Relational Database (the Telescope Management System---TMS), an online data Archive, and WWW based utilities to an, in part, 10-year old system. The new functionality was added with remarkably few alterations to the existing system. We are still actively expanding and exploring these new capabilities.

  5. The decommissioning information management system

    International Nuclear Information System (INIS)

    Park, Seung-Kook; Moon, Jei-Kwon

    2015-01-01

    At the Korea Atomic Energy Research Institute (KAERI), the Korea Research Reactor (KRR-2) and one uranium conversion plant (UCP) were decommissioned. A project was launched in 1997, for the decommissioning of KRR-2 reactor with the goal of completion by 2008. Another project for the decommissioning of the UCP was launched in 2001. The physical dismantling works were started in August 2003 and the entire project was completed by the end of 2010. KAERI has developed a computer information system, named DECOMMIS, for an information management with an increased effectiveness for decommissioning projects and for record keeping for the future decommissioning projects. This decommissioning information system consists of three sub-systems; code management system, data input system (DDIS) and data processing and output system (DDPS). Through the DDIS, the data can be directly inputted at sites to minimize the time gap between the dismantling activities and the evaluation of the data by the project staff. The DDPS provides useful information to the staff for more effective project management and this information includes several fields, such as project progress management, man power management, waste management, and radiation dose control of workers and so on. The DECOMMIS was applied to the decommissioning projects of the KRR-2 and the UCP, and was utilized to give information to the staff for making decisions regarding the progress of projects. It is also to prepare the reference data for the R and D program which is for the development of the decommissioning engineering system tools and to maintain the decommissioning data for the next projects. In this paper, the overall system will be explained and the several examples of its utilization, focused on waste management and manpower control, will be introduced. (author)

  6. Integrated Systems Health Management for Intelligent Systems

    Science.gov (United States)

    Figueroa, Fernando; Melcher, Kevin

    2011-01-01

    The implementation of an integrated system health management (ISHM) capability is fundamentally linked to the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system. It is akin to having a team of experts who are all individually and collectively observing and analyzing a complex system, and communicating effectively with each other in order to arrive at an accurate and reliable assessment of its health. In this paper, concepts, procedures, and approaches are presented as a foundation for implementing an intelligent systems ]relevant ISHM capability. The capability stresses integration of DIaK from all elements of a system. Both ground-based (remote) and on-board ISHM capabilities are compared and contrasted. The information presented is the result of many years of research, development, and maturation of technologies, and of prototype implementations in operational systems.

  7. DKIST facility management system integration

    Science.gov (United States)

    White, Charles R.; Phelps, LeEllen

    2016-07-01

    The Daniel K. Inouye Solar Telescope (DKIST) Observatory is under construction at Haleakalā, Maui, Hawai'i. When complete, the DKIST will be the largest solar telescope in the world. The Facility Management System (FMS) is a subsystem of the high-level Facility Control System (FCS) and directly controls the Facility Thermal System (FTS). The FMS receives operational mode information from the FCS while making process data available to the FCS and includes hardware and software to integrate and control all aspects of the FTS including the Carousel Cooling System, the Telescope Chamber Environmental Control Systems, and the Temperature Monitoring System. In addition it will integrate the Power Energy Management System and several service systems such as heating, ventilation, and air conditioning (HVAC), the Domestic Water Distribution System, and the Vacuum System. All of these subsystems must operate in coordination to provide the best possible observing conditions and overall building management. Further, the FMS must actively react to varying weather conditions and observational requirements. The physical impact of the facility must not interfere with neighboring installations while operating in a very environmentally and culturally sensitive area. The FMS system will be comprised of five Programmable Automation Controllers (PACs). We present a pre-build overview of the functional plan to integrate all of the FMS subsystems.

  8. Information Systems and Management Training.

    Science.gov (United States)

    Curry, B.; Smith, D. G.

    1991-01-01

    A case study of a South Wales manufacturer illustrates the need for companies to adopt an integrated strategy for computerization and information systems. Lack of management training blending computing and business skills can have a crippling effect on system development and organizational health. (SK)

  9. Tennessee Offender Management Information System

    OpenAIRE

    Beck, Tim

    1993-01-01

    This article describes the integration of a knowledge-based system with a large COBOL-DB2-based offender management system. The knowledge-based application, developed for the purpose of offender sentence calculation, is shown to provide several benefits, including a shortened development cycle, simplified maintenance, and improved accuracy over a previous COBOL-based application.

  10. Automated plant, production management system

    Science.gov (United States)

    Aksenova, V. I.; Belov, V. I.

    1984-12-01

    The development of a complex of tasks for the operational management of production (OUP) within the framework of an automated system for production management (ASUP) shows that it is impossible to have effective computations without reliable initial information. The influence of many factors involving the production and economic activity of the entire enterprise upon the plan and course of production are considered. It is suggested that an adequate model should be available which covers all levels of the hierarchical system: workplace, section (bridgade), shop, enterprise, and the model should be incorporated into the technological sequence of performance and there should be provisions for an adequate man machine system.

  11. Application of ICP-QMS for the determination of ultratrace-levels of 226Ra in geothermal water and sediment samples

    International Nuclear Information System (INIS)

    Tsuey-Lin Tsai; Tsung-Yuan Wang; Hwa-Jou Wei; Lee-Chung Men; Chun-Chih Lin

    2010-01-01

    A rapid, accurate and less labor intensive approach to determining 226 Ra in environmental samples was examined; this utilized quadrupole-based inductively coupled plasma mass spectrometry (ICP-QMS). The procedure used chemical separation by ion exchange chromatography to remove most of the matrices after coprecipitation with BaSO 4 . The average chemical recovery of the NIST SRM preparation method ranged from 60.5 to 85.9% using 133 Ba as internal tracer by gamma counting. This technique was capable of completing a 226 Ra measurement within 3 min. It did not require an in-growth period to allow radon and its progeny to achieve secular equilibrium with the parent 226 Ra as is needed for liquid scintillation analyzer (LSA). The method detection limits for the determination of 226 Ra in geothermal water and sediment samples were 0.02 mBq L -1 (0.558 fg L -1 ) and 0.10 Bq kg -1 (2.79 fg g -1 ), respectively. The results obtained with various natural samples and the suitability of the method when applied to various environmental matrices such as geothermal water and sediment are discussed. When ICP-QMS was compared to double-focusing magnetic sector field inductively coupled plasma mass spectrometry (ICP-SFMS), good agreement was obtained with a correlation coefficient, r 2 = 0.982. (author)

  12. Accurate determination of Curium and Californium isotopic ratios by inductively coupled plasma quadrupole mass spectrometry (ICP-QMS) in 248Cm samples for transmutation studies

    Energy Technology Data Exchange (ETDEWEB)

    Gourgiotis, A.; Isnard, H.; Aubert, M.; Dupont, E.; AlMahamid, I.; Cassette, P.; Panebianco, S.; Letourneau, A.; Chartier, F.; Tian, G.; Rao, L.; Lukens, W.

    2011-02-01

    The French Atomic Energy Commission has carried out several experiments including the mini-INCA (INcineration of Actinides) project for the study of minor-actinide transmutation processes in high intensity thermal neutron fluxes, in view of proposing solutions to reduce the radiotoxicity of long-lived nuclear wastes. In this context, a Cm sample enriched in {sup 248}Cm ({approx}97 %) was irradiated in thermal neutron flux at the High Flux Reactor (HFR) of the Laue-Langevin Institute (ILL). This work describes a quadrupole ICP-MS (ICP-QMS) analytical procedure for precise and accurate isotopic composition determination of Cm before sample irradiation and of Cm and Cf after sample irradiation. The factors that affect the accuracy and reproducibility of isotopic ratio measurements by ICP-QMS, such as peak centre correction, detector dead time, mass bias, abundance sensitivity and hydrides formation, instrumental background, and memory blank were carefully evaluated and corrected. Uncertainties of the isotopic ratios, taking into account internal precision of isotope ratio measurements, peak tailing, and hydrides formations ranged from 0.3% to 1.3%. This uncertainties range is quite acceptable for the nuclear data to be used in transmutation studies.

  13. Electromagnetic spectrum management system

    Science.gov (United States)

    Seastrand, Douglas R.

    2017-01-31

    A system for transmitting a wireless countermeasure signal to disrupt third party communications is disclosed that include an antenna configured to receive wireless signals and transmit wireless counter measure signals such that the wireless countermeasure signals are responsive to the received wireless signals. A receiver processes the received wireless signals to create processed received signal data while a spectrum control module subtracts known source signal data from the processed received signal data to generate unknown source signal data. The unknown source signal data is based on unknown wireless signals, such as enemy signals. A transmitter is configured to process the unknown source signal data to create countermeasure signals and transmit a wireless countermeasure signal over the first antenna or a second antenna to thereby interfere with the unknown wireless signals.

  14. Electromagnetic spectrum management system

    Energy Technology Data Exchange (ETDEWEB)

    Seastrand, Douglas R.

    2017-10-17

    A system for transmitting a wireless countermeasure signal to disrupt third party communications is disclosed that include an antenna configured to receive wireless signals and transmit wireless counter measure signals such that the wireless countermeasure signals are responsive to the received wireless signals. A receiver processes the received wireless signals to create processed received signal data while a spectrum control module subtracts known source signal data from the processed received signal data to generate unknown source signal data. The unknown source signal data is based on unknown wireless signals, such as enemy signals. A transmitter is configured to process the unknown source signal data to create countermeasure signals and transmit a wireless countermeasure signal over the first antenna or a second antenna to thereby interfere with the unknown wireless signals.

  15. Integrated management system best practices in radioecological laboratories; Sistema de gestao integrado: melhores praticas para laboratorios radioecologicos

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho, Claudia Aparecida Zerbinatti de

    2010-07-01

    The research aims to study the best practices to support a conceptual proposal for IMS - Integrated Management System (quality, environment, safety and health) applicable to Radioecology laboratories. The research design is organized into the following steps: in a first step, it was developed the bibliographic and documentary research in IMS, survey and study of standards (QMS ISO 9000 (2005), ISO 9001 (2008), ISO 9004 (2000), EMS ISO 14001 (2004) and OHSMS OHSAS 18001 (2007) and OHSAS 18002 (2008)), identification and characterization of processes in Radioecology Laboratories and study of best practices methodology and benchmarking; in the second stage of the research it was developed a case study (qualitative research, with questionnaires via e-mail and interviews, when possible), preceded by a survey and selection of international and national radioecology laboratories and then these laboratories were contacted and some of them agreed to participate in this research; in the third stage of the research it was built the framework of best practices that showed results that could support the conceptual proposal for the IMS Radioecology Laboratory; the fourth and final stage of research consisted in the construction of the proposed conceptual framework of SGI for Radioecology Laboratory, being then achieved the initial objective of the research. (author)

  16. Autonomously managed high power systems

    International Nuclear Information System (INIS)

    Weeks, D.J.; Bechtel, R.T.

    1985-01-01

    The need for autonomous power management capabilities will increase as the power levels of spacecraft increase into the multi-100 kW range. The quantity of labor intensive ground and crew support consumed by the 9 kW Skylab cannot be afforded in support of a 75-300 kW Space Station or high power earth orbital and interplanetary spacecraft. Marshall Space Flight Center is managing a program to develop necessary technologies for high power system autonomous management. To date a reference electrical power system and automation approaches have been defined. A test facility for evaluation and verification of management algorithms and hardware has been designed with the first of the three power channel capability nearing completion

  17. Operational Management System for Regulated Water Systems

    Science.gov (United States)

    van Loenen, A.; van Dijk, M.; van Verseveld, W.; Berger, H.

    2012-04-01

    Most of the Dutch large rivers, canals and lakes are controlled by the Dutch water authorities. The main reasons concern safety, navigation and fresh water supply. Historically the separate water bodies have been controlled locally. For optimizating management of these water systems an integrated approach was required. Presented is a platform which integrates data from all control objects for monitoring and control purposes. The Operational Management System for Regulated Water Systems (IWP) is an implementation of Delft-FEWS which supports operational control of water systems and actively gives advice. One of the main characteristics of IWP is that is real-time collects, transforms and presents different types of data, which all add to the operational water management. Next to that, hydrodynamic models and intelligent decision support tools are added to support the water managers during their daily control activities. An important advantage of IWP is that it uses the Delft-FEWS framework, therefore processes like central data collection, transformations, data processing and presentation are simply configured. At all control locations the same information is readily available. The operational water management itself gains from this information, but it can also contribute to cost efficiency (no unnecessary pumping), better use of available storage and advise during (water polution) calamities.

  18. Technical Literature Review Concerning Management Information Systems.

    Science.gov (United States)

    interrelationships of the many aspects of management information systems (MIS); that is, with how analysis, design, operation, evaluation, and user considerations affect management information systems . (Author)

  19. Introduction to Management Information system

    OpenAIRE

    Mishra, Umakant

    2013-01-01

    A Management Information System (MIS) is a systematic organization and presentation of information that is generally required by the management of an organization for taking better decisions for the organization. The MIS data may be derived from various units of the organization or from other sources. However it is very difficult to say the exact structure of MIS as the structure and goals of different types of organizations are different. Hence both the data and structure of MIS is dependent...

  20. Laboratory information management system proposal

    Energy Technology Data Exchange (ETDEWEB)

    Brown, B.; Schweitzer, S.; Adams, C.; White, S. [Tennessee Univ., Knoxville, TN (United States)

    1992-08-01

    The objectives of this paper is design a user friendly information management system using a relational database in order to: allow customers direct access to the system; provide customers with direct sample tracking capabilities; provide customers with more timely, consistent reporting; better allocate costs for analyses to appropriate customers; eliminate cumbersome and costly papertrails; and enhance facility utilization by laboratory personnel. The resultant savings through increased efficiency provided by this system should more than offset its cost in the long-term.

  1. Laboratory information management system proposal

    Energy Technology Data Exchange (ETDEWEB)

    Brown, B.; Schweitzer, S.; Adams, C.; White, S. (Tennessee Univ., Knoxville, TN (United States))

    1992-01-01

    The objectives of this paper is design a user friendly information management system using a relational database in order to: allow customers direct access to the system; provide customers with direct sample tracking capabilities; provide customers with more timely, consistent reporting; better allocate costs for analyses to appropriate customers; eliminate cumbersome and costly papertrails; and enhance facility utilization by laboratory personnel. The resultant savings through increased efficiency provided by this system should more than offset its cost in the long-term.

  2. Intentional systems management: managing forests for biodiversity.

    Science.gov (United States)

    A.B. Carey; B.R. Lippke; J. Sessions

    1999-01-01

    Conservation of biodiversity provides for economic, social, and environmental sustainability. Intentional management is designed to manage conflicts among groups with conflicting interests. Our goal was to ascertain if intentional management and principles of conservation of biodiversity could be combined into upland and riparian forest management strategies that would...

  3. The CMS Data Management System

    Science.gov (United States)

    Giffels, M.; Guo, Y.; Kuznetsov, V.; Magini, N.; Wildish, T.

    2014-06-01

    The data management elements in CMS are scalable, modular, and designed to work together. The main components are PhEDEx, the data transfer and location system; the Data Booking Service (DBS), a metadata catalog; and the Data Aggregation Service (DAS), designed to aggregate views and provide them to users and services. Tens of thousands of samples have been cataloged and petabytes of data have been moved since the run began. The modular system has allowed the optimal use of appropriate underlying technologies. In this contribution we will discuss the use of both Oracle and NoSQL databases to implement the data management elements as well as the individual architectures chosen. We will discuss how the data management system functioned during the first run, and what improvements are planned in preparation for 2015.

  4. The CMS data management system

    International Nuclear Information System (INIS)

    Giffels, M; Magini, N; Guo, Y; Kuznetsov, V; Wildish, T

    2014-01-01

    The data management elements in CMS are scalable, modular, and designed to work together. The main components are PhEDEx, the data transfer and location system; the Data Booking Service (DBS), a metadata catalog; and the Data Aggregation Service (DAS), designed to aggregate views and provide them to users and services. Tens of thousands of samples have been cataloged and petabytes of data have been moved since the run began. The modular system has allowed the optimal use of appropriate underlying technologies. In this contribution we will discuss the use of both Oracle and NoSQL databases to implement the data management elements as well as the individual architectures chosen. We will discuss how the data management system functioned during the first run, and what improvements are planned in preparation for 2015.

  5. Management of complex dynamical systems

    Science.gov (United States)

    MacKay, R. S.

    2018-02-01

    Complex dynamical systems are systems with many interdependent components which evolve in time. One might wish to control their trajectories, but a more practical alternative is to control just their statistical behaviour. In many contexts this would be both sufficient and a more realistic goal, e.g. climate and socio-economic systems. I refer to it as ‘management’ of complex dynamical systems. In this paper, some mathematics for management of complex dynamical systems is developed in the weakly dependent regime, and questions are posed for the strongly dependent regime.

  6. Nuclear maintenance and management system

    International Nuclear Information System (INIS)

    Yamaji, Yoshihiro; Abe, Norihiko

    2000-01-01

    The Mitsubishi Electric Co., Ltd. has developed to introduce various computer systems for desk-top business assistance in a power plant such as system isolation assisting system, operation parameter management system, and so on under aiming at business effectiveness since these ten and some years. Recently, by further elapsed years of the plants when required for further cost reduction and together with change of business environment represented by preparation of individual personal computer, further effectiveness, preparation of the business environment, and upgrading of maintenance in power plant business have been required. Among such background, she has carried out various proposals and developments on construction of a maintenance and management system integrated the business assistant know-hows and the plant know-hows both accumulated previously. They are composed of three main points on rationalization of business management and document management in the further effectiveness, preparation of business environment, TBM maintenance, introduction of CBM maintenance and introduction of maintenance assistance in upgrading of maintenance. Here was introduced on system concepts aiming at the further effectiveness of the nuclear power plant business, preparation of business environment, upgrading of maintenance and maintenance, and so on, at a background of environment around maintenance business in the nuclear power plants (cost-down, highly elapsed year of the plant, change of business environment). (G.K)

  7. System of Enterprise Reputation Management

    Directory of Open Access Journals (Sweden)

    Derevianko Olena. H.

    2014-03-01

    Full Text Available The article offers a system of enterprise reputation management directed at increase of economic benefits from formation and maintenance of high reputation in the result of maximisation of the volume of the incoming cash flows of the enterprise and also their duration and stability. It proves that reputation management, which allows achievement of economic goals of the enterprise, should be directed at key groups of stakeholders: growth of products sales is ensured by consumers, growth of internal stability – by enterprise personnel, growth of external stability – by society, including authority bodies, growth of business value – by investors, owners and partners. The article describes components of the system of enterprise reputation management, the degree of development of which are determined by three vectors: interaction with stakeholders and level of their feedback: messaging, informing, convincing and attracting; activity of the used instruments of reputation management, regularity and intensity, and also quantitative indicators of their application within the framework of directions of the product PR, corporate PR and IR, internal PR, GR and PR-CSR; level of organisational pre-requisites (functional, system and strategic of the system of reputation management.

  8. Auditing of environmental management system

    Directory of Open Access Journals (Sweden)

    Čuchranová Katarína

    2001-12-01

    Full Text Available Environmental auditing has estabilished itself as a valueable instrument to verify and help to improve the environmental performance.Organizations of all kinds may have a need to demonstrate the environmental responsibility. The concept of environmental management systems and the associated practice of environmental auditing have been advanced as one way to satisfy this need.These system are intended to help an organization to establish and continue to meet its environmental policies, objectives, standards and other requirements.Environmental auditing is a systematic and documented verification process of objectively obtaining and evaluating audit evidence to determine whether an organizations environmental management system conforms to the environmental management system audit criteria set by the organization and for the communication of the results of this process to the management.The following article intercepts all parts of preparation environmental auditing.The audit programme and procedures should cover the activities and areas to be considered in audits, the frequency of audits, the responsibilities associated with managing and conducting audits, the communication of audit results, auditor competence, and how audits will be conducted.The International Standard ISO 140011 estabilishes the audit procedures that determine conformance with EMS audit criteria.

  9. 14 CFR 1212.704 - System manager.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false System manager. 1212.704 Section 1212.704... Authority and Responsibilities § 1212.704 System manager. (a) Each system manager is responsible for the following with regard to the system of records over which the system manager has cognizance: (1) Overall...

  10. The SMAP Dictionary Management System

    Science.gov (United States)

    Smith, Kevin A.; Swan, Christoper A.

    2014-01-01

    The Soil Moisture Active Passive (SMAP) Dictionary Management System is a web-based tool to develop and store a mission dictionary. A mission dictionary defines the interface between a ground system and a spacecraft. In recent years, mission dictionaries have grown in size and scope, making it difficult for engineers across multiple disciplines to coordinate the dictionary development effort. The Dictionary Management Systemaddresses these issues by placing all dictionary information in one place, taking advantage of the efficiencies inherent in co-locating what were once disparate dictionary development efforts.

  11. Efficient document management by introduction of a new, dynamic quality manual application according to DIN EN ISO 9001:2000

    International Nuclear Information System (INIS)

    Pache, G.; Saueressig, U.; Baumann, T.; Langer, M.; Kotter, E.

    2008-01-01

    Purpose: Evaluation of the impact of a new, dynamic computer-aided quality manual application (QMA) regarding the acceptance and efficiency of a quality management system (QMS) according to DIN EN ISO 9001:2000. Materials and Method: The QMA combines static pages of HTML with active content generated from an underlying database. Through user access rights, a hierarchy is defined to create and administer quality documents. Document workflow, feedback management and employee survey were analyzed to compare the performance of the new QMH with the formerly used static versions. Results: Integration of a document editor and automated document re-approval accelerated the document process by an average of 10 min. In spite of an increase of the yearly document changes of 60%, the administration effort was reduced by approximately 160 h. Integration of the feedback management system into the QMA decreased handling time from an average of 16.5 to 3.4 days. Simultaneously the number of feedback messages increased from 160 in 2005 to 306 in 2006. Employee satisfaction was raised (old: 3.19±1.02, new: 1.91±0.8). The number of users who partook in the QMA more than once a week also increased from 29.5% to 60%. Conclusion: The computer-aided quality manual application constitutes the basis for the success of our QMS. The possibility to actively participate in the quality management process has led to broad acceptance and usage by the employees. The administration effort was able to be tremendously decreased as compared to conventional QMS. (orig.)

  12. The Prototype Automated Research Management System (ARMS)

    National Research Council Canada - National Science Library

    Prekop, Paul

    2004-01-01

    Automated Research Management System (ARMS) is a knowledge management application designed to address many of the knowledge management problems identified by SmartWays and FASSP's Knowledge Management Review...

  13. Integrated therapy safety management system.

    Science.gov (United States)

    Podtschaske, Beatrice; Fuchs, Daniela; Friesdorf, Wolfgang

    2013-09-01

    The aim is to demonstrate the benefit of the medico-ergonomic approach for the redesign of clinical work systems. Based on the six layer model, a concept for an 'integrated therapy safety management' is drafted. This concept could serve as a basis to improve resilience. The concept is developed through a concept-based approach. The state of the art of safety and complexity research in human factors and ergonomics forms the basis. The findings are synthesized to a concept for 'integrated therapy safety management'. The concept is applied by way of example for the 'medication process' to demonstrate its practical implementation. The 'integrated therapy safety management' is drafted in accordance with the six layer model. This model supports a detailed description of specific work tasks, the corresponding responsibilities and related workflows at different layers by using the concept of 'bridge managers'. 'Bridge managers' anticipate potential errors and monitor the controlled system continuously. If disruptions or disturbances occur, they respond with corrective actions which ensure that no harm results and they initiate preventive measures for future procedures. The concept demonstrates that in a complex work system, the human factor is the key element and final authority to cope with the residual complexity. The expertise of the 'bridge managers' and the recursive hierarchical structure results in highly adaptive clinical work systems and increases their resilience. The medico-ergonomic approach is a highly promising way of coping with two complexities. It offers a systematic framework for comprehensive analyses of clinical work systems and promotes interdisciplinary collaboration. © 2013 The Authors. British Journal of Clinical Pharmacology © 2013 The British Pharmacological Society.

  14. Networked inventory management systems: materializing supply chain management

    NARCIS (Netherlands)

    Verwijmeren, M.A.A.P.; Vlist, van der P.; Donselaar, van K.H.

    1996-01-01

    Aims to explain the driving forces for networked inventory management. Discusses major developments with respect to customer requirements, networked organizations and networked inventory management. Presents high level specifications of networked inventory management information systems (NIMISs).

  15. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  16. Data management system performance modeling

    Science.gov (United States)

    Kiser, Larry M.

    1993-01-01

    This paper discusses analytical techniques that have been used to gain a better understanding of the Space Station Freedom's (SSF's) Data Management System (DMS). The DMS is a complex, distributed, real-time computer system that has been redesigned numerous times. The implications of these redesigns have not been fully analyzed. This paper discusses the advantages and disadvantages for static analytical techniques such as Rate Monotonic Analysis (RMA) and also provides a rationale for dynamic modeling. Factors such as system architecture, processor utilization, bus architecture, queuing, etc. are well suited for analysis with a dynamic model. The significance of performance measures for a real-time system are discussed.

  17. Knowledge management: processes and systems | Igbinovia ...

    African Journals Online (AJOL)

    Knowledge management: processes and systems. ... Information Impact: Journal of Information and Knowledge Management ... observation, role reversal technique, and discussion forums as well as the forms of knowledge representation to include report writing, database management system and institutional repositories.

  18. Intelligent power system data management systems (DBMS)

    Energy Technology Data Exchange (ETDEWEB)

    Middleton, A.; Macdonald, E. [GE Digital Energy, Markham, ON (Canada); Schreiner, Z. [Intelligent Process Solutions GmbH, Lindau (Germany); Bizjak, J. [Elektro Ljubljana d.d., Ljubljana (Slovenia)

    2010-07-01

    Network owners/operators from around the world have moved from electromechanical products to intelligent electronic devices (IEDs). Most networks have a multi-generation technology mix because protection assets have a normal application lifespan of between 10 and 40 years. Associated data capture and maintenance management regimes have therefore moved from paper based into digitized media, creating a significant increase in the volume of acquired data, such that there is now a mix of paper and digitized storage. Data is rarely consolidated or used for decision making in asset management processes once testing is completed, having a major impact on overall power system reliability. This paper presented the concept of intelligent operative maintenance management, now becoming more recognized in the industry. The concept was described as the management of operational data, resulting actions and responses, wherever and by whoever they are needed, without any additional overhead. The paper discussed new techniques of testing as well as planning and operative maintenance. The practical benefits of the new system were also presented, with particular reference to central management; simplification of routine protocols; secondary testing; and reduced cost of data handling. It was concluded that the main benefit from all of the techniques discussed in this paper is that experienced expert test engineers can focus more time upon making good, critical decisions to ensure that utilities maximize their customer service and safety regimes. 13 refs., 7 figs.

  19. An Integrated Knowledge Management System

    Directory of Open Access Journals (Sweden)

    Vasile Mazilescu

    2014-11-01

    Full Text Available The aim of this paper is to present a Knowledge Management System based on Fuzzy Logic (FLKMS, a real-time expert system to meet the challenges of the dynamic environment. The main feature of our integrated shell FLKMS is that it models and integrates the temporal relationships between the dynamic of the evolution of an economic process with some fuzzy inferential methods, using a knowledge model for control, embedded within the expert system’s operational knowledge base.

  20. Information system revives materials management

    International Nuclear Information System (INIS)

    Hansen, T.

    1995-01-01

    Through a change in philosophy and the development of a new, more efficient information management system, Arizona Public Service Co. (APSW) has, in less than two years, reduced material and service costs by 10 percent. The utility plans to cut these costs form 1993 figures by 25 percent before 2000. The utility is breaking new ground with ongoing implementation of new business processes and the new Materials Logistics Information System (MLIS), which has been co-developed with Texas Instruments Software Division (TISD)

  1. Systems approach in energy management

    International Nuclear Information System (INIS)

    Dutta-Choudhury, K.

    1993-01-01

    Several years ago when the author was working in the chemicals division of a paper company in Instrumentation and Controls, one experience had a lasting impact on his work approach which is systems approach. The maintenance manager told the author that a very important piece of boiler instrument of the power plant had broken down and delivery of the replacement needed to be expedited. The instrument was ordered over the phone in another city. The purchase order was personally delivered at the supplier's office and arrangements were made so the instrument was put on the next flight. A week later the maintenance manager indicated that the particular instrument still had not arrived in the plant and he could not run the power plant. Thus the company incurred substantial losses. Further inquiries showed that the instrument did indeed arrive at the plant stores on time. But, in the absence of any instructions thereon, the instrument was not delivered to the power plant. The sense of urgency was lost in the existing delivery process. In other words, the process or system failed. The whole process from requisitioning to delivery of ordered items was analyzed and corrective procedures were incorporated to prevent future repetitions. This brings up the subject of systems approach in engineering management in general and energy management in particular. This involves defining an objective and designing a system for an effective way of getting there

  2. Grenada Education Management Information System

    OpenAIRE

    Porta, Emilio; Klein, Jennifer; Arcia, Gustavo; Nannyonjo, Harriet

    2012-01-01

    The Education Management Information System (EMIS) country report for Grenada includes the following headings: background which includes education data in Grenada, EMIS staff, facilities and equipment, EMIS data, and publications; prerequisites of quality; assurances of integrity; methodological soundness; accuracy and reliability; serviceability; and accessibility.

  3. DEVELOPMENT OF MANAGEMENT INFORMATION SYSTEMS

    OpenAIRE

    Wiesław Samitowski

    2016-01-01

    On the basis of many years of experience in providing consulting services in the area of management, the author presents the issues regarding the development of information systems to be applied in business. The analysis is conducted within the framework of a field of study introduced by the author and referred to as infornomics.

  4. Managing conflicts in systems development.

    Science.gov (United States)

    Barnett, E

    1997-05-01

    Conflict in systems development is nothing new. It can vary in intensity, but there will always be two possible outcomes--one constructive and the other destructive. The common approach to conflict management is to draw the battle lines and apply brute force. However, there are other ways to deal with conflict that are more effective and more people oriented.

  5. Project quality management critical success factors for buildings

    CERN Document Server

    Low, Sui Pheng

    2014-01-01

    The book presents the development of the Construction Quality Assessment System (CONQUAS), Singapore’s de facto quality performance measurement system, explains the application of the Quality Management System (QMS) to manage CONQUAS and identifies 33 critical success factors (CSFs) for achieving high CONQUAS scores. Through CONQUAS, the reader benefits from understanding how the Singapore government developed and implemented the first objective system for measuring what many building professionals have perceived to be elusive quality standards in the construction industry. The book presents both the theoretical concepts as well as the practical aspects to achieving strategic Project Quality Management that is anchored on the CSFs to building best practices. To realistically reflect the practical aspects and challenging issues faced by stakeholders in the construction industry, questionnaire surveys were conducted with building professionals to distinguish the importance level and extent of adoption of the ...

  6. OSPACS: Ultrasound image management system

    Directory of Open Access Journals (Sweden)

    Bessant Conrad

    2008-06-01

    Full Text Available Abstract Background Ultrasound scanning uses the medical imaging format, DICOM, for electronically storing the images and data associated with a particular scan. Large health care facilities typically use a picture archiving and communication system (PACS for storing and retrieving such images. However, these systems are usually not suitable for managing large collections of anonymized ultrasound images gathered during a clinical screening trial. Results We have developed a system enabling the accurate archiving and management of ultrasound images gathered during a clinical screening trial. It is based upon a Windows application utilizing an open-source DICOM image viewer and a relational database. The system automates the bulk import of DICOM files from removable media by cross-validating the patient information against an external database, anonymizing the data as well as the image, and then storing the contents of the file as a field in a database record. These image records may then be retrieved from the database and presented in a tree-view control so that the user can select particular images for display in a DICOM viewer or export them to external media. Conclusion This system provides error-free automation of ultrasound image archiving and management, suitable for use in a clinical trial. An open-source project has been established to promote continued development of the system.

  7. Automated Car Park Management System

    Science.gov (United States)

    Fabros, J. P.; Tabañag, D.; Espra, A.; Gerasta, O. J.

    2015-06-01

    This study aims to develop a prototype for an Automated Car Park Management System that will increase the quality of service of parking lots through the integration of a smart system that assists motorist in finding vacant parking lot. The research was based on implementing an operating system and a monitoring system for parking system without the use of manpower. This will include Parking Guidance and Information System concept which will efficiently assist motorists and ensures the safety of the vehicles and the valuables inside the vehicle. For monitoring, Optical Character Recognition was employed to monitor and put into list all the cars entering the parking area. All parking events in this system are visible via MATLAB GUI which contain time-in, time-out, time consumed information and also the lot number where the car parks. To put into reality, this system has a payment method, and it comes via a coin slot operation to control the exit gate. The Automated Car Park Management System was successfully built by utilizing microcontrollers specifically one PIC18f4550 and two PIC16F84s and one PIC16F628A.

  8. A systems engineering management approach to resource management applications

    Science.gov (United States)

    Hornstein, Rhoda Shaller

    1989-01-01

    The author presents a program management response to the following question: How can the traditional practice of systems engineering management, including requirements specification, be adapted, enhanced, or modified to build future planning and scheduling systems for effective operations? The systems engineering management process, as traditionally practiced, is examined. Extensible resource management systems are discussed. It is concluded that extensible systems are a partial solution to problems presented by requirements that are incomplete, partially immeasurable, and often dynamic. There are positive indications that resource management systems have been characterized and modeled sufficiently to allow their implementation as extensible systems.

  9. A system for managing information at ATLAS

    International Nuclear Information System (INIS)

    Tilbrook, I.R.

    1993-01-01

    In response to a need for better management of maintenance and document information at the Argonne Tandem-Linear Accelerating System (ATLAS), the ATLAS Information Management System (AIMS) has been created. The system is based on the relational database model. The system's applications use the Alpha-4 relational database management system, a commercially available software package. The system's function and design are described

  10. Information Security Management - Part Of The Integrated Management System

    Science.gov (United States)

    Manea, Constantin Adrian

    2015-07-01

    The international management standards allow their integrated approach, thereby combining aspects of particular importance to the activity of any organization, from the quality management systems or the environmental management of the information security systems or the business continuity management systems. Although there is no national or international regulation, nor a defined standard for the Integrated Management System, the need to implement an integrated system occurs within the organization, which feels the opportunity to integrate the management components into a cohesive system, in agreement with the purpose and mission publicly stated. The issues relating to information security in the organization, from the perspective of the management system, raise serious questions to any organization in the current context of electronic information, reason for which we consider not only appropriate but necessary to promote and implement an Integrated Management System Quality - Environment - Health and Operational Security - Information Security

  11. Information Architecture for Quality Management Support in Hospitals.

    Science.gov (United States)

    Rocha, Álvaro; Freixo, Jorge

    2015-10-01

    Quality Management occupies a strategic role in organizations, and the adoption of computer tools within an aligned information architecture facilitates the challenge of making more with less, promoting the development of a competitive edge and sustainability. A formal Information Architecture (IA) lends organizations an enhanced knowledge but, above all, favours management. This simplifies the reinvention of processes, the reformulation of procedures, bridging and the cooperation amongst the multiple actors of an organization. In the present investigation work we planned the IA for the Quality Management System (QMS) of a Hospital, which allowed us to develop and implement the QUALITUS (QUALITUS, name of the computer application developed to support Quality Management in a Hospital Unit) computer application. This solution translated itself in significant gains for the Hospital Unit under study, accelerating the quality management process and reducing the tasks, the number of documents, the information to be filled in and information errors, amongst others.

  12. Metrics for border management systems.

    Energy Technology Data Exchange (ETDEWEB)

    Duggan, Ruth Ann

    2009-07-01

    There are as many unique and disparate manifestations of border systems as there are borders to protect. Border Security is a highly complex system analysis problem with global, regional, national, sector, and border element dimensions for land, water, and air domains. The complexity increases with the multiple, and sometimes conflicting, missions for regulating the flow of people and goods across borders, while securing them for national security. These systems include frontier border surveillance, immigration management and customs functions that must operate in a variety of weather, terrain, operational conditions, cultural constraints, and geopolitical contexts. As part of a Laboratory Directed Research and Development Project 08-684 (Year 1), the team developed a reference framework to decompose this complex system into international/regional, national, and border elements levels covering customs, immigration, and border policing functions. This generalized architecture is relevant to both domestic and international borders. As part of year two of this project (09-1204), the team determined relevant relative measures to better understand border management performance. This paper describes those relative metrics and how they can be used to improve border management systems.

  13. MIMS - MEDICAL INFORMATION MANAGEMENT SYSTEM

    Science.gov (United States)

    Frankowski, J. W.

    1994-01-01

    MIMS, Medical Information Management System is an interactive, general purpose information storage and retrieval system. It was first designed to be used in medical data management, and can be used to handle all aspects of data related to patient care. Other areas of application for MIMS include: managing occupational safety data in the public and private sectors; handling judicial information where speed and accuracy are high priorities; systemizing purchasing and procurement systems; and analyzing organizational cost structures. Because of its free format design, MIMS can offer immediate assistance where manipulation of large data bases is required. File structures, data categories, field lengths and formats, including alphabetic and/or numeric, are all user defined. The user can quickly and efficiently extract, display, and analyze the data. Three means of extracting data are provided: certain short items of information, such as social security numbers, can be used to uniquely identify each record for quick access; records can be selected which match conditions defined by the user; and specific categories of data can be selected. Data may be displayed and analyzed in several ways which include: generating tabular information assembled from comparison of all the records on the system; generating statistical information on numeric data such as means, standard deviations and standard errors; and displaying formatted listings of output data. The MIMS program is written in Microsoft FORTRAN-77. It was designed to operate on IBM Personal Computers and compatibles running under PC or MS DOS 2.00 or higher. MIMS was developed in 1987.

  14. The LHCb Data Management System

    International Nuclear Information System (INIS)

    Baud, J P; Charpentier, Ph; Ciba, K; Lanciotti, E; Màthè, Z; Graciani, R; Remenska, D; Santana, R

    2012-01-01

    The LHCb Data Management System is based on the DIRAC Grid Community Solution. LHCbDirac provides extensions to the basic DMS such as a Bookkeeping System. Datasets are defined as sets of files corresponding to a given query in the Bookkeeping system. Datasets can be manipulated by CLI tools as well as by automatic transformations (removal, replication, processing). A dynamic handling of dataset replication is performed, based on disk space usage at the sites and dataset popularity. For custodial storage, an on-demand recall of files from tape is performed, driven by the requests of the jobs, including disk cache handling. We shall describe the tools that are available for Data Management, from handling of large datasets to basic tools for users as well as for monitoring the dynamic behavior of LHCb Storage capacity.

  15. PROMIS (Procurement Management Information System)

    Science.gov (United States)

    1987-01-01

    The PROcurement Management Information System (PROMIS) provides both detailed and summary level information on all procurement actions performed within NASA's procurement offices at Marshall Space Flight Center (MSFC). It provides not only on-line access, but also schedules procurement actions, monitors their progress, and updates Forecast Award Dates. Except for a few computational routines coded in FORTRAN, the majority of the systems is coded in a high level language called NATURAL. A relational Data Base Management System called ADABAS is utilized. Certain fields, called descriptors, are set up on each file to allow the selection of records based on a specified value or range of values. The use of like descriptors on different files serves as the link between the falls, thus producing a relational data base. Twenty related files are currently being maintained on PROMIS.

  16. Archetypes for Managing ERP Systems

    DEFF Research Database (Denmark)

    Kræmmergaard, Pernille; Fill, Michael; Simonsen, Martin

    2007-01-01

    . In our research of 20 case-studies we found certain similarities and differences in the patterns which coalesced around three alternatives in the way organizations approach the managing of ERP in the second wave. We describe these archetypes, which we call the Calculators, the Co-players and the Drivers......, and we present illustrative cases of each of the archetypes. The archetypes are believed to play an important role in conveying the essential differences existing in alternative ways in which organizations manage their ERP system during the second wave....

  17. Archetypes for Managing ERP Systems

    DEFF Research Database (Denmark)

    Kræmmergaard, Pernille; Hansen, Michael Fiil

    2006-01-01

    . In our research of 20 case-studies we found certain similarities and differences in the patterns which coalesced around three alternatives in the way organizations approach the managing of ERP in the second wave. We describe these archetypes, which we call the Calculators, the Co-players and the Drivers......, and we present illustrative cases of each of the archetypes. The archetypes are believed to play an important role in conveying the essential differences existing in alternative ways in which organizations manage their ERP system during the second wave....

  18. ISO 14000 : environmental management systems

    International Nuclear Information System (INIS)

    Boutin, C.; Emard, C.; Lalonde, G.; Levesque, A.; Robitaille, R.; Rollin, A.L.; Thibeault, I.

    1996-01-01

    This book is addressed to the managers, professionals, and government agents which wish to know the philosophy of the step as well as the stages to be followed for the establishment of a system of environmental management in conformity with the standards of the series ISO 14000. This work locates ISO 14000 in the historical context of its development by describing the bonds with other standards in place of which those of the series ISO 9000. This book answers questions that arise regarding a companies step toward accreditation to ISO 14000

  19. The Cheetah data management system

    International Nuclear Information System (INIS)

    Kunz, P.F.; Word, G.B.

    1992-09-01

    Cheetah is a data management system based on the C programming language, with support for other languages. Its main goal is to transfer data between memory and I/O steams in a general way. The streams are either associated with disk files or are network data stems. Cheetah provides optional convenience functions to assist in the management of C structures. Cheetah steams are self-describing so that general purpose applications can fully understand an incoming steam. This information can be used to display the data in an incoming steam to the user of an interactive general application, complete with variable names and optional comments

  20. Radiology information management system, TOSRIM

    International Nuclear Information System (INIS)

    Tani, Yuichiro; Uchiyama, Akira; Kimura, Hirohito

    1991-01-01

    This is a report on a new type of distributed computer system for radiology departments named 'TOSRIM' (Toshiba radiology information management system), which is designed to be installed between medical diagnosis equipment and a host computer system in a hospital. Recently, a new type of host computer system has been developed which enables doctors to order any of the hospital's entire activities using terminals. By connecting 'TOSRIM' to this type of host computer system, many of the activities of a radiology department can be carried out via terminals without the use of examination requirement forms. As well as being connected to medical diagnosis equipment, 'TOSRIM' can also be connected to a medical imaging system which stores and displays medical images. By means of these connections, doctors will be able to diagnose medical images using display terminals without the need for films. (author)

  1. Radiology information management system, TOSRIM

    Energy Technology Data Exchange (ETDEWEB)

    Tani, Yuichiro; Uchiyama, Akira; Kimura, Hirohito (Toshiba Corp., Kawasaki, Kanagawa (Japan))

    1991-02-01

    This is a report on a new type of distributed computer system for radiology departments named 'TOSRIM' (Toshiba radiology information management system), which is designed to be installed between medical diagnosis equipment and a host computer system in a hospital. Recently, a new type of host computer system has been developed which enables doctors to order any of the hospital's entire activities using terminals. By connecting 'TOSRIM' to this type of host computer system, many of the activities of a radiology department can be carried out via terminals without the use of examination requirement forms. As well as being connected to medical diagnosis equipment, 'TOSRIM' can also be connected to a medical imaging system which stores and displays medical images. By means of these connections, doctors will be able to diagnose medical images using display terminals without the need for films. (author).

  2. Radioactive waste integrated management system

    Energy Technology Data Exchange (ETDEWEB)

    Song, D Y; Choi, S S; Han, B S [Atomic Creative Technology, Taejon (Korea, Republic of)

    2003-10-01

    In this paper, we present an integrated management system for radioactive waste, which can keep watch on the whole transporting process of each drum from nuclear power plant temporary storage house to radioactive waste storage house remotely. Our approach use RFID(Radio Frequency Identification) system, which can recognize the data information without touch, GSP system, which can calculate the current position precisely using the accurate time and distance measured from satellites, and the spread spectrum technology CDMA, which is widely used in the area of mobile communication.

  3. Radioactive waste integrated management system

    International Nuclear Information System (INIS)

    Song, D. Y.; Choi, S. S.; Han, B. S.

    2003-01-01

    In this paper, we present an integrated management system for radioactive waste, which can keep watch on the whole transporting process of each drum from nuclear power plant temporary storage house to radioactive waste storage house remotely. Our approach use RFID(Radio Frequency Identification) system, which can recognize the data information without touch, GSP system, which can calculate the current position precisely using the accurate time and distance measured from satellites, and the spread spectrum technology CDMA, which is widely used in the area of mobile communication

  4. Spatial Data Management System (SDMS)

    Science.gov (United States)

    Hutchison, Mark W.

    1994-01-01

    The Spatial Data Management System (SDMS) is a testbed for retrieval and display of spatially related material. SDMS permits the linkage of large graphical display objects with detail displays and explanations of its smaller components. SDMS combines UNIX workstations, MIT's X Window system, TCP/IP and WAIS information retrieval technology to prototype a means of associating aggregate data linked via spatial orientation. SDMS capitalizes upon and extends previous accomplishments of the Software Technology Branch in the area of Virtual Reality and Automated Library Systems.

  5. OSH management systems in enterprises

    Directory of Open Access Journals (Sweden)

    B. Kalandyk

    2010-04-01

    Full Text Available Nowadays, in modern companies and enterprises, safety means much more than only the evaluation of risk and analysis of accidents. Theactivities in the area of the occupational health and safety should form an integral part of the enterprise management system. According toa framework directive no 89/391/EEC the EU member states are obliged to implement standards related with the occupational health andsafety systems. The standard most popular and used most commonly, as applicable to enterprises of any type, is the international OHSAS18001 system and in Poland Polish Standards PN-N-18001.

  6. Integrated Computer System of Management in Logistics

    Science.gov (United States)

    Chwesiuk, Krzysztof

    2011-06-01

    This paper aims at presenting a concept of an integrated computer system of management in logistics, particularly in supply and distribution chains. Consequently, the paper includes the basic idea of the concept of computer-based management in logistics and components of the system, such as CAM and CIM systems in production processes, and management systems for storage, materials flow, and for managing transport, forwarding and logistics companies. The platform which integrates computer-aided management systems is that of electronic data interchange.

  7. Respiratory care management information systems.

    Science.gov (United States)

    Ford, Richard M

    2004-04-01

    Hospital-wide computerized information systems evolved from the need to capture patient information and perform billing and other financial functions. These systems, however, have fallen short of meeting the needs of respiratory care departments regarding work load assessment, productivity management, and the level of outcome reporting required to support programs such as patient-driven protocols. The respiratory care management information systems (RCMIS) of today offer many advantages over paper-based systems and hospital-wide computer systems. RCMIS are designed to facilitate functions specific to respiratory care, including assessing work demand, assigning and tracking resources, charting, billing, and reporting results. RCMIS incorporate mobile, point-of-care charting and are highly configurable to meet the specific needs of individual respiratory care departments. Important and substantial benefits can be realized with an RCMIS and mobile, wireless charting devices. The initial and ongoing costs of an RCMIS are justified by increased charge capture and reduced costs, by way of improved productivity and efficiency. It is not unusual to recover the total cost of an RCMIS within the first year of its operation. In addition, such systems can facilitate and monitor patient-care protocols and help to efficiently manage the vast amounts of information encountered during the practitioner's workday. Respiratory care departments that invest in RCMIS have an advantage in the provision of quality care and in reducing expenses. A centralized respiratory therapy department with an RCMIS is the most efficient and cost-effective way to monitor work demand and manage the hospital-wide allocation of respiratory care services.

  8. Knowledge management systems in practice

    DEFF Research Database (Denmark)

    Tørning, Kristian

    which has the strategy of working with knowledge in the form of "best practices" meant to boost performance. The thesis explores the situation that workers are in, since they are meant to share and develop "best practices" knowledge in a portal based Knowledge Management System (KMS). The study...... indentifies a set of problems that prevents knowledge sharing from taking place to the degree to which management was specifically aiming. It was explored whether these problems could, to some degree, be mitigated by employing persuasive design, which is a new stance towards design where the aim...... is to directly seek to change the user's behavior, i.e., persuading more knowledge sharing. The main contribution is an indication of an anomaly with regards to the strategic approach towards knowledge management, where knowledge sharing is seen as an effort by which companies can gain a competitive advantage...

  9. International safeguards data management system

    International Nuclear Information System (INIS)

    Argentesi, F.; Costantini, L.; Franklin, M.; Dondi, M.G.

    1981-01-01

    The data base management system ''ISADAM'' (i.e. International Safeguards Data Management System) described in this report is intended to facilitate the safeguards authority in making efficient and effective use of accounting reports. ISADAM has been developed using the ADABAS data base management system and is implemented on the JRC-Ispra computer. The evaluation of safeguards declarations focuses on three main objectives: - the requirement of syntactical consistency with the legal conventions of data recording for safeguards accountancy; - the requirement of accounting evidence that there is no material unaccounted for (MUF); - the requirement of semantic consistency with the technological characteristics of the plant and the processing plans of the operator. Section 2 describes in more detail the facilities which ISADAM makes available to a safeguards inspector. Section 3 describes how the MUF variance computation is derived from models of measurement error propagation. Many features of the ISADAM system are automatically provided by ADABAS. The exceptions to this are the utility software designed to: - screen plant declarations before loading into the data base, - prepare variance summary files designed to support real-time computation of MUF and variance of MUF, - provide analyses in response to user requests in interactive or batch mode. Section 4 describes the structure and functions of this software which have been developed by JRC-Ispra

  10. XCPU2 process management system

    Energy Technology Data Exchange (ETDEWEB)

    Ionkov, Latchesar [Los Alamos National Laboratory; Van Hensbergen, Eric [IBM AUSTIN RESEARCH LAB

    2009-01-01

    Xcpu2 is a new process management system that allows the users to specify custom file system for a running job. Most cluster management systems enforce single software distribution running on all nodes. Xcpu2 allows programs running on the cluster to work in environment identical to the user's desktop, using the same versions of the libraries and tools the user installed locally, and accessing the configuration file in the same places they are located on the desktop. Xcpu2 builds on our earlier work with the Xcpu system. Like Xcpu, Xcpu2's process management interface is represented as a set of files exported by a 9P file server. It supports heterogeneous clusters and multiple head nodes. Unlike Xcpu, it uses pull instead of push model. In this paper we describe the Xcpu2 clustering model, its operation and how the per-job filesystem configuration can be used to solve some of the common problems when running a cluster.

  11. INTEGRATION OF ENVIRONMENTAL MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Tomescu Ada Mirela

    2012-07-01

    Full Text Available The relevance of management as significant factor of business activity can be established on various management systems. These will help to obtain, organise, administrate, evaluate and control particulars: information, quality, environmental protection, health and safety, various resources (time, human, finance, inventory etc. The complexity of nowadays days development, forced us to think ‘integrated’. Sustainable development principles require that environment management policies and practices are not good in themselves but also integrate with all other environmental objectives, and with social and economic development objectives. The principles of sustainable development involve that environment management policies and practices. These are not sound in them-self but also integrate with all other environmental objectives, and with social and economic development objectives. Those objectives were realized, and followed by development of strategies to effects the objective of sustainable development. Environmental management should embrace recent change in the area of environmental protection, and suit the recently regulations of the field -entire legal and economic, as well as perform management systems to meet the requirements of the contemporary model for economic development. These changes are trailed by abandon the conventional approach of environmental protection and it is replaced by sustainable development (SD. The keys and the aims of Cleaner Productions (CP are presented being implemented in various companies as a non-formalised environmental management system (EMS. This concept is suggested here as a proper model for practice where possible environmental harmful technologies are used -e.g. Rosia Montana. Showing the features and the power of CP this paper is a signal oriented to involve the awareness of policy-makers and top management of diverse Romanian companies. Many companies in European countries are developing

  12. Waste management - an integral part of environmental management systems

    Energy Technology Data Exchange (ETDEWEB)

    Hamm, Ulrich

    1998-12-01

    To consider waste as a resource instead of an annoyance with which the management has to cope with, has become an unavoidable task for modern managers. The task the management has to take to secure competitiveness in an environment of rising complexity of production processes and further increasing legal requirements, is to manage waste as much as other recourses are managed. Waste has to be considered an aspect of planning and decision process just as business plans or logistics are. Main themes discussed in this publication comprise waste management, implementation of waste management as an integral part of environmental management systems, and management approach to waste - the results. 4 figs.

  13. Data management system advanced development

    Science.gov (United States)

    Douglas, Katherine; Humphries, Terry

    1990-01-01

    The Data Management System (DMS) Advanced Development task provides for the development of concepts, new tools, DMS services, and for the testing of the Space Station DMS hardware and software. It also provides for the development of techniques capable of determining the effects of system changes/enhancements, additions of new technology, and/or hardware and software growth on system performance. This paper will address the built-in characteristics which will support network monitoring requirements in the design of the evolving DMS network implementation, functional and performance requirements for a real-time, multiprogramming, multiprocessor operating system, and the possible use of advanced development techniques such as expert systems and artificial intelligence tools in the DMS design.

  14. A computerized legal information management system | Ohiagu ...

    African Journals Online (AJOL)

    A computerized legal information management system. ... process through the filling system using the survey research methodology. ... A framework for the design and implementation of a legal information management system was presented.

  15. Overview of Management Systems. No. 157.

    Science.gov (United States)

    Goddu, Roland

    The need for organizational management is discussed, and educational management systems are examined, with attention paid to organizational components and different approaches to organizational control. (MJB)

  16. ISO 9000 Quality Management System

    Science.gov (United States)

    Hadjicostas, Evsevios

    The ISO 9000 series describes a quality management system applicable to any organization. In this chapter we present the requirements of the standard in a way that is as close as possible to the needs of analytical laboratories. The sequence of the requirements follows that in the ISO 9001:2008 standard. In addition, the guidelines for performance improvement set out in the ISO 9004 are reviewed. Both standards should be used as a reference as well as the basis for further elaboration.

  17. INTEGRATED HSEQ MANAGEMENT SYSTEMS: DEVELOPMENTS AND TRENDS

    OpenAIRE

    Osmo Kauppila; Janne Härkönen; Seppo Väyrynen

    2015-01-01

    The integration of health and safety, environmental and quality (HSEQ) management systems has become a current topic in the 21st century, as the need for systems thinking has grown along with the number of management system standards. This study aims to map current developments and trends in integrated HSEQ management. Three viewpoints are taken: the current state of the main HSEQ management standards, research literature on integrated management systems (IMS), and a case study of an industry...

  18. The quality management system applied at PRPN

    International Nuclear Information System (INIS)

    Benar Bukit

    2007-01-01

    The ISO 9001-2000 is an International standard for quality management systems. The application of this quality management system is for guaranteeing that the organizations products will fulfill requirements set by its customers. Here the steps taken to apply the quality management system at PRPN are expounded in five main parts, namely quality management system, responsibilities of the management, resources, product realization, measurement, analysis and repair. (author)

  19. Essentials of Project and Systems Engineering Management

    CERN Document Server

    Eisner, Howard S

    2008-01-01

    The Third Edition of Essentials of Project and Systems Engineering Management enables readers to manage the design, development, and engineering of systems effectively and efficiently. The book both defines and describes the essentials of project and systems engineering management and, moreover, shows the critical relationship and interconnection between project management and systems engineering. The author's comprehensive presentation has proven successful in enabling both engineers and project managers to understand their roles, collaborate, and quickly grasp and apply all the basic princip

  20. Management information systems software evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Al-Tunisi, N.; Ghazzawi, A.; Gruyaert, F.; Clarke, D. [Saudi Aramco, Dhahran (Saudi Arabia). Process and Control Systems Dept.

    1995-11-01

    In November 1993, Saudi Aramco management endorsed a proposal to coordinate the development of the Management Information Systems (MISs) of four concurrent projects for its facilities Controls Modernization Program. The affected projects were the Ras Tanura Refinery Upgrade Project, the Abqaiq Plant Controls Modernization and the Shedgum and Uthmaniyah Gas plants Control Upgrade Projects. All of these projects had a significant requirement of MISs in their scope. Under the leadership of the Process and Control Systems Department, and MIS Coordination Team was formed with representatives of several departments. An MIS Applications Evaluation procedure was developed based on the Kepner Tregoe Decisions Analysis Process and general questionnaires were sent to over a hundred potential Vendors. The applications were divided into several categories, such as: Data Capture and Historization, Human User Interface, Trending, Reporting, Graphic Displays, Data Reconciliation, Statistical Analysis, Expert Systems, Maintenance Applications, Document Management and Operations Planning and Scheduling. For each of the MIS Application areas, detailed follow-up questionnaires were used to short list the candidate products. In May and June 1994, selected Vendors were invited to Saudi Arabia for an Exhibition which was open to all Saudi Aramco employees. In conjunction with this, the Vendors were subjected to a rigorous product testing exercise by independent teams of testers. The paper will describe the methods used and the lessons learned in this extensive software evaluation phase, which was a first for Saudi Aramco.

  1. Management information systems software evaluation

    International Nuclear Information System (INIS)

    Al-Tunisi, N.; Ghazzawi, A.; Gruyaert, F.; Clarke, D.

    1995-01-01

    In November 1993, Saudi Aramco management endorsed a proposal to coordinate the development of the Management Information Systems (MISs) of four concurrent projects for its facilities Controls Modernization Program. The affected projects were the Ras Tanura Refinery Upgrade Project, the Abqaiq Plant Controls Modernization and the Shedgum and Uthmaniyah Gas plants Control Upgrade Projects. All of these projects had a significant requirement of MISs in their scope. Under the leadership of the Process and Control Systems Department, and MIS Coordination Team was formed with representatives of several departments. An MIS Applications Evaluation procedure was developed based on the Kepner Tregoe Decisions Analysis Process and general questionnaires were sent to over a hundred potential Vendors. The applications were divided into several categories, such as: Data Capture and Historization, Human User Interface, Trending, Reporting, Graphic Displays, Data Reconciliation, Statistical Analysis, Expert Systems, Maintenance Applications, Document Management and Operations Planning and Scheduling. For each of the MIS Application areas, detailed follow-up questionnaires were used to short list the candidate products. In May and June 1994, selected Vendors were invited to Saudi Arabia for an Exhibition which was open to all Saudi Aramco employees. In conjunction with this, the Vendors were subjected to a rigorous product testing exercise by independent teams of testers. The paper will describe the methods used and the lessons learned in this extensive software evaluation phase, which was a first for Saudi Aramco

  2. The system for waste management

    International Nuclear Information System (INIS)

    Hennelly, E.J.

    1987-01-01

    The author views the system for the management of high level radioactive waste as having five major components science and technology, domestic politics, international programs, regulation and institutions, and the ever changing rules and public perceptions. A system failure will usually occur because of the failure to communicate and not because of inadequate scientific data or engineering skills. For effective communication to occur the participants need to understand each other. The author will focus on this issue as a major theme of this presentation

  3. Environmental management & audit 2: Management systems

    OpenAIRE

    2018-01-01

    The present scientific monograph, entitled “Environmental management & audit“, is the result of three years’ work on an international project entitled “Environmental management in Russian companies – retraining courses for the sensibilization for and integration of Eco-Audit programs in corporate decision-making (RECOAUD)”. Within its more than 600 pages, the monograph features interesting texts written by 31 authors from the European Union and the Russian Federation, edited by dr. Borut Jere...

  4. Configuration Management File Manager Developed for Numerical Propulsion System Simulation

    Science.gov (United States)

    Follen, Gregory J.

    1997-01-01

    One of the objectives of the High Performance Computing and Communication Project's (HPCCP) Numerical Propulsion System Simulation (NPSS) is to provide a common and consistent way to manage applications, data, and engine simulations. The NPSS Configuration Management (CM) File Manager integrated with the Common Desktop Environment (CDE) window management system provides a common look and feel for the configuration management of data, applications, and engine simulations for U.S. engine companies. In addition, CM File Manager provides tools to manage a simulation. Features include managing input files, output files, textual notes, and any other material normally associated with simulation. The CM File Manager includes a generic configuration management Application Program Interface (API) that can be adapted for the configuration management repositories of any U.S. engine company.

  5. Electric vehicle energy management system

    Science.gov (United States)

    Alaoui, Chakib

    This thesis investigates and analyzes novel strategies for the optimum energy management of electric vehicles (EVs). These are aimed to maximize the useful life of the EV batteries and make the EV more practical in order to increase its acceptability to market. The first strategy concerns the right choice of the batteries for the EV according to the user's driving habits, which may vary. Tests conducted at the University of Massachusetts Lowell battery lab show that the batteries perform differently from one manufacturer to the other. The second strategy was to investigate the fast chargeability of different batteries, which leads to reduce the time needed to recharge the EV battery pack. Tests were conducted again to prove that only few battery types could be fast charged. Test data were used to design a fast battery charger that could be installed in an EV charging station. The third strategy was the design, fabrication and application of an Electric Vehicle Diagnostic and Rejuvenation System (EVDRS). This system is based on Mosfet Controlled Thyristors (MCTs). It is capable of quickly identifying any failing battery(s) within the EV pack and rejuvenating the whole battery pack without dismantling them and unloading them. A novel algorithm to rejuvenate Electric Vehicle Sealed Lead Acid Batteries is described. This rejuvenation extends the useful life of the batteries and makes the EV more competitive. The fourth strategy was to design a thermal management system for EV, which is crucial to the safe operation, and the achievement of normal/optimal performance of, electric vehicle (EV) batteries. A novel approach for EV thermal management, based on Pettier-Effect heat pumps, was designed, fabricated and tested in EV. It shows the application of this type of technology for thermal management of EVs.

  6. The impact of SLMTA in improving laboratory quality systems in the Caribbean Region.

    Science.gov (United States)

    Guevara, Giselle; Gordon, Floris; Irving, Yvette; Whyms, Ismae; Parris, Keith; Beckles, Songee; Maruta, Talkmore; Ndlovu, Nqobile; Albalak, Rachel; Alemnji, George

    Past efforts to improve laboratory quality systems and to achieve accreditation for better patient care in the Caribbean Region have been slow. To describe the impact of the Strengthening of Laboratory Management Toward Accreditation (SLMTA) training programme and mentorship amongst five clinical laboratories in the Caribbean after 18 months. Five national reference laboratories from four countries participated in the SLMTA programme that incorporated classroom teaching and implementation of improvement projects. Mentors were assigned to the laboratories to guide trainees on their improvement projects and to assist in the development of Quality Management Systems (QMS). Audits were conducted at baseline, six months, exit (at 12 months) and post-SLMTA (at 18 months) using the Stepwise Laboratory Quality Improvement Process Towards Accreditation (SLIPTA) checklist to measure changes in implementation of the QMS during the period. At the end of each audit, a comprehensive implementation plan was developed in order to address gaps. Baseline audit scores ranged from 19% to 52%, corresponding to 0 stars on the SLIPTA five-star scale. After 18 months, one laboratory reached four stars, two reached three stars and two reached two stars. There was a corresponding decrease in nonconformities and development of over 100 management and technical standard operating procedures in each of the five laboratories. The tremendous improvement in these five Caribbean laboratories shows that SLMTA coupled with mentorship is an effective, user-friendly, flexible and customisable approach to the implementation of laboratory QMS. It is recommended that other laboratories in the region consider using the SLMTA training programme as they engage in quality systems improvement and preparation for accreditation.

  7. Licensing management system prototype system design

    International Nuclear Information System (INIS)

    Immerman, W.H.; Arcuni, A.A.; Elliott, J.M.; Chapman, L.D.

    1983-11-01

    This report is a design document for a prototype implementation of a licensing management system (LMS) as defined in SAND83-7080. It describes the concept of operations for full implementation of an LMS in accordance with the previously defined functional requirements. It defines a subset of a full LMS suitable for meeting prototype implementation goals, and proposes a system design for this subset. The report describes overall system design considerations consistent with, but more explicit than the general characteristics required by the LMS functional definition. A high level design is presented for just those functions selected for prototype implementation. The report also provides a data element dictionary describing the structured logical data elements required to implement the selected functions

  8. CIMS: The Cartographic Information Management System,

    Science.gov (United States)

    1981-01-01

    use. Large-scale information systems may cover large amounts of information such as the Land Identification and Information Management System (LIMS...small computer in managing the information holdings of a mapping institute. The result is the Cartographic Information Management System (CIMS), a...American countrie.s. 1 .- - _ _ _ _. = _ m m m THE CARTOGRAPHIC INFORMATION MANAGEMENT SYSTEM System Rationale Interactive computer-assisted cartography

  9. Implementation of a quality management system according to 9001 standard in a hospital in the home unit: changes and achievements.

    Science.gov (United States)

    Rodríguez-Cerrillo, Matilde; Fernández-Diaz, Eddita; Iñurrieta-Romero, Amaia; Poza-Montoro, Ana

    2012-01-01

    The purpose of this paper is to describe changes and results obtained after implementation of a quality management system (QMS) according to ISO standards in a Hospital in the Home (HIH) Unit. The paper describes changes made and outcomes achieved. This took part in the HiH Unit, Clinico Hospital, Madrid, Spain, and looked at admissions, mean stay, patient satisfaction, adverse events, returns to hospital, no admitted referrals, complaints, compliance to protocols, equipment failures and resolution of urgent consultations. In June 2008, HiH Unit, Clinico Hospital obtained ISO certification. The main results achieved are as follows. There was an increase in patients' satisfaction--in June 2008, assessment of the quality of care provided by staff was scored at 4.7 (on a scale of 1 to 5); in 2010 it has been scored at 4.96. Patient satisfaction rate has increased from 92 percent to 98.8 percent. No complaints from patients were received. Unscheduled returns to hospital have decreased from 7 percent to 3 percent. There were no medical equipment failures. External suppliers' performance has improved. Material and medication needed by staff was available when necessary. The number of admissions has increased. Compliance to protocols has reached 97 percent. Inappropriate referrals have decreased by 8 percent. Six medications-related incidents were detected; in two cases the incident was not due to an error. In the other four cases error could have been detected before reaching the patient. Implementations of an ISO quality management system allow improved quality of care and patient satisfaction in a HIH Unit.

  10. TRAMWAY MANAGEMENT SYSTEM IN INDONESIA

    Directory of Open Access Journals (Sweden)

    Melia Damayanti

    2015-01-01

    Full Text Available Tramway systems, which can carry more passengers than buses at one haul, are now being proposed to meet Indonesia’s public transport requirement. The objective of this research is to analyze the management structures for operating tram in different countries and then propose a suitable organizational structure for operating trams, if re-introduced, in Indonesia. The author chose France (Montpellier tramway, Germany (Karlsruhe tram-train and the UK (Nottingham Express Transit as the role model countries for investigation. From the analysis, the most appropriate organizational structure and suitable tramway management structure for operating tramways implementation in Indonesia. The key features of the research are to establish public transport company by local government to manage all public transport systems, propose tramway construction and operation to exist as separate departments under the tramway team division of the public company, recommend the public transport company to have responsibility for overseeing construction of the trams, operating, and maintaining the trams, suggest local government to own them and have responsibility for tramway strategic policy, control regulation as well as supervision and coordination of the performance of the public transport company, propose joint working between public and private sectors.

  11. Using electronic document management systems to manage highway project files.

    Science.gov (United States)

    2011-12-12

    "WisDOTs Bureau of Technical Services is interested in learning about the practices of other state departments of : transportation in developing and implementing an electronic document management system to manage highway : project files"

  12. Improvement of management systems for nuclear facilities

    International Nuclear Information System (INIS)

    2005-01-01

    The area of Quality Management/ Quality Assurance has been changed dramatically over the past years. The nuclear facilities moved from the 'traditional' Quality Assurance approach towards Quality Management Systems, and later a new concept of Integrated Management Systems was introduced. The IAEA is developing a new set of Standards on Integrated Management Systems, which will replace the current 50-C-Q/SG-Q1-Q14 Code. The new set of document will require the integration of all management areas into one coherent management system. The new set of standards on Management Systems promotes the concept of the Integrated Management Systems. Based on new set a big number of documents are under preparation. These documents will address the current issues in the management systems area, e.g. Management of Change, Continuous Improvement, Self-assessment, and Attributes of effective management, etc. Currently NPES is providing a number of TC projects and Extra Budgetary Programmes to assist Member States in this area. The new Standards on Management Systems will be published in 2006. A number of Regulatory bodies already indicated that they would take the new Management System Standards as a basis for the national regulation. This fact will motivate a considerable change in the management of nuclear utilities, requiring a new approach. This activity is suitable for all IAEA Members States with large or limited nuclear capabilities. The service is directed to provide assistance for the management of all organizations carrying on or regulating nuclear activities and facilities

  13. Development of Information Management System for Plant Life Cycle Management

    International Nuclear Information System (INIS)

    Byon, SuJin; Lee, SangHyun; Kim, WooJoong

    2015-01-01

    The study subjects are S. Korean NPP(Nuclear Power Plant) construction projects. Design, construction, operations companies have different nuclear power plant construction project structures, and each company has its own Information Management System. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each lifecycle phase. The main perspective of Information Management is moving from the existent document-centric management to the data-centric management. To do so, we intend to integrate information with interfaces among systems. Integrated information management structure and management system are essential for an effective management of the lifecycle information of nuclear power plants that have a lifespan over as much as 80 years. The concept of integration management adopted by the defence, ocean industries or various PLM solution providers is important. Although the NPP project has application systems in each key lifecycle phase, it is more effective to develop and use PLIMS in consideration of the interface and compatibility of information among systems. As an initial study for development of that integrated information management structure, this study is building the system and has interfaced it with a design-stage system

  14. Development of Information Management System for Plant Life Cycle Management

    Energy Technology Data Exchange (ETDEWEB)

    Byon, SuJin; Lee, SangHyun; Kim, WooJoong [KOREA HYDRO and NUCLEAR POWER CO. LTD, Daejeon (Korea, Republic of)

    2015-10-15

    The study subjects are S. Korean NPP(Nuclear Power Plant) construction projects. Design, construction, operations companies have different nuclear power plant construction project structures, and each company has its own Information Management System. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each lifecycle phase. The main perspective of Information Management is moving from the existent document-centric management to the data-centric management. To do so, we intend to integrate information with interfaces among systems. Integrated information management structure and management system are essential for an effective management of the lifecycle information of nuclear power plants that have a lifespan over as much as 80 years. The concept of integration management adopted by the defence, ocean industries or various PLM solution providers is important. Although the NPP project has application systems in each key lifecycle phase, it is more effective to develop and use PLIMS in consideration of the interface and compatibility of information among systems. As an initial study for development of that integrated information management structure, this study is building the system and has interfaced it with a design-stage system.

  15. Efficient document management by introduction of a new, dynamic quality manual application according to DIN EN ISO 9001:2000; Effiziente Qualitaetsmanagementdokumentation durch Einfuehrung eines neuen, dynamischen Qualitaetsmanagementhandbuchs nach DIN EN ISO 9001:2000

    Energy Technology Data Exchange (ETDEWEB)

    Pache, G.; Saueressig, U.; Baumann, T.; Langer, M.; Kotter, E. [Universitaetsklinikum Freiburg (Germany). Abt. Roentgendiagnostik; Duerselen, L. [DxD Consulting, Degern (Germany)

    2008-06-15

    Purpose: Evaluation of the impact of a new, dynamic computer-aided quality manual application (QMA) regarding the acceptance and efficiency of a quality management system (QMS) according to DIN EN ISO 9001:2000. Materials and Method: The QMA combines static pages of HTML with active content generated from an underlying database. Through user access rights, a hierarchy is defined to create and administer quality documents. Document workflow, feedback management and employee survey were analyzed to compare the performance of the new QMH with the formerly used static versions. Results: Integration of a document editor and automated document re-approval accelerated the document process by an average of 10 min. In spite of an increase of the yearly document changes of 60%, the administration effort was reduced by approximately 160 h. Integration of the feedback management system into the QMA decreased handling time from an average of 16.5 to 3.4 days. Simultaneously the number of feedback messages increased from 160 in 2005 to 306 in 2006. Employee satisfaction was raised (old: 3.19{+-}1.02, new: 1.91{+-}0.8). The number of users who partook in the QMA more than once a week also increased from 29.5% to 60%. Conclusion: The computer-aided quality manual application constitutes the basis for the success of our QMS. The possibility to actively participate in the quality management process has led to broad acceptance and usage by the employees. The administration effort was able to be tremendously decreased as compared to conventional QMS. (orig.)

  16. Senior Management Use of Management Control Systems in Large Companies

    DEFF Research Database (Denmark)

    Willert, Jeanette; Israelsen, Poul; Rohde, Carsten

    2017-01-01

    Ferreira and Otley’s (2009) conceptual and holistic framework for performance management systems, supplemented by elements of contextual factors and organisational culture. Further, selected researchers’ perceptions of the purpose of using management control systems are related to practitioners’ ideas......The use of management control systems in large companies remains relatively unexplored. Indeed, only a few studies of senior managers’ use of management control systems consider multiple controls in companies. This paper explores data from a comprehensive survey of the use of management control...... systems in 120 strategic business units at some of the largest companies in Denmark. The paper identifies how senior management guides and controls their subordinates to meet their companies’ objectives. The presentation and discussion of the results, including citations from executive managers, use...

  17. Integrated Procurement Management System, Version II

    Science.gov (United States)

    Collier, L. J.

    1985-01-01

    Integrated Procurement Management System, Version II (IPMS II) is online/ batch system for collecting developing, managing and disseminating procurementrelated data at NASA Johnson Space Center. Portions of IPMS II adaptable to other procurement situations.

  18. A rural transit asset management system

    Science.gov (United States)

    2005-01-01

    This reports the research undertaken to create an interactive, geographic information system based asset management system for the Alabama Department of Transportation to manage vehicles purchased and operated through Section 5310 and 5311 federal gr...

  19. Environmental Management System ISO 14001

    CERN Document Server

    Haider, Syed

    2010-01-01

    This is a must-have tool for any company in the process of adopting and incorporating the ISO 14001:2004 requirements, this book and accompanying CD-ROM provides the latest updates and amendments and translates the ISO language into actionable strategy. Offering administrative solutions to managers of all sorts, it includes practical examples of policies with objectives, targets, and action plans applicable to any process related industry or an ordinary organization. With template formats and hands-on flow charts to describe step-by-step system development, documentation, and implementation ph

  20. Electricity pricing and management systems

    International Nuclear Information System (INIS)

    Sawal, D.M.; Bajapai, Ashok

    1997-01-01

    The installed capacity of power generation in India is at present 80,000 MW. Out of the total 5.79 lakh inhabitated villages in the country, 4.79 villages have been electrified so far. Total number of consumers of electricity are about 95 million in the country. For such a large country with population of over 900 million and area of 32.873 lakh sq. kms., the role of electricity pricing and management system of the power sector is of paramount importance

  1. Learning Management Systems and Comparison of Open Source Learning Management Systems and Proprietary Learning Management Systems

    Directory of Open Access Journals (Sweden)

    Yücel Yılmaz

    2016-04-01

    Full Text Available The concept of learning has been increasingly gaining importance for individuals, businesses and communities in the age of information. On the other hand, developments in information and communication technologies take effect in the field of learning activities. With these technologies, barriers of time and space against the learning activities largely disappear and these technologies make it easier to carry out these activities more effectively. There remain a lot of questions regarding selection of learning management system (LMS to be used for the management of e-learning processes by all organizations conducing educational practices including universities, companies, non-profit organizations, etc. The main questions are as follows: Shall we choose open source LMS or commercial LMS? Can the selected LMS meet existing needs and future potential needs for the organization? What are the possibilities of technical support in the management of LMS? What kind of problems may be experienced in the use of LMS and how can these problems be solved? How much effective can officials in the organization be in the management of LMS? In this study, primarily e-learning and the concept of LMS will be discussed, and in the next section, as for answers to these questions, open source LMSs and centrally developed LMSs will be examined and their advantages and disadvantages relative to each other will be discussed.

  2. Strategic management of health care information systems: nurse managers' perceptions.

    Science.gov (United States)

    Lammintakanen, Johanna; Kivinen, Tuula; Saranto, Kaija; Kinnunen, Juha

    2009-01-01

    The aim of this study is to describe nurse managers' perceptions of the strategic management of information systems in health care. Lack of strategic thinking is a typical feature in health care and this may also concern information systems. The data for this study was collected by eight focus group interviews including altogether 48 nurse managers from primary and specialised health care. Five main categories described the strategic management of information systems in health care; IT as an emphasis of strategy; lack of strategic management of information systems; the importance of management; problems in privacy protection; and costs of IT. Although IT was emphasised in the strategies of many health care organisations, a typical feature was a lack of strategic management of information systems. This was seen both as an underutilisation of IT opportunities in health care organisations and as increased workload from nurse managers' perspective. Furthermore, the nurse managers reported that implementation of IT strengthened their managerial roles but also required stronger management. In conclusion, strategic management of information systems needs to be strengthened in health care and nurse managers should be more involved in this process.

  3. Design and Data Management System

    Science.gov (United States)

    Messer, Elizabeth; Messer, Brad; Carter, Judy; Singletary, Todd; Albasini, Colby; Smith, Tammy

    2007-01-01

    The Design and Data Management System (DDMS) was developed to automate the NASA Engineering Order (EO) and Engineering Change Request (ECR) processes at the Propulsion Test Facilities at Stennis Space Center for efficient and effective Configuration Management (CM). Prior to the development of DDMS, the CM system was a manual, paper-based system that required an EO or ECR submitter to walk the changes through the acceptance process to obtain necessary approval signatures. This approval process could take up to two weeks, and was subject to a variety of human errors. The process also requires that the CM office make copies and distribute them to the Configuration Control Board members for review prior to meetings. At any point, there was a potential for an error or loss of the change records, meaning the configuration of record was not accurate. The new Web-based DDMS eliminates unnecessary copies, reduces the time needed to distribute the paperwork, reduces time to gain the necessary signatures, and prevents the variety of errors inherent in the previous manual system. After implementation of the DDMS, all EOs and ECRs can be automatically checked prior to submittal to ensure that the documentation is complete and accurate. Much of the configuration information can be documented in the DDMS through pull-down forms to ensure consistent entries by the engineers and technicians in the field. The software also can electronically route the documents through the signature process to obtain the necessary approvals needed for work authorization. The workflow of the system allows for backups and timestamps that determine the correct routing and completion of all required authorizations in a more timely manner, as well as assuring the quality and accuracy of the configuration documents.

  4. Senior Management Use of Management Control Systems in Large Companies

    DEFF Research Database (Denmark)

    Willert, Jeanette; Israelsen, Poul; Rohde, Carsten

    2017-01-01

    The use of management control systems in large companies remains relatively unexplored. Indeed, only a few studies of senior managers’ use of management control systems consider multiple controls in companies. This paper explores data from a comprehensive survey of the use of management control...... systems in 120 strategic business units at some of the largest companies in Denmark. The paper identifies how senior management guides and controls their subordinates to meet their companies’ objectives. The presentation and discussion of the results, including citations from executive managers, use...

  5. Construction Management Risk System (CMRS for Construction Management (CM Firms

    Directory of Open Access Journals (Sweden)

    Kyungmo Park

    2017-02-01

    Full Text Available After the global financial crisis of 2008, the need for risk management arose because it was necessary to minimize the losses in construction management (CM firms. This was caused by a decreased amount of orders in the Korean CM market, which intensified order competition between companies. However, research results revealed that risks were not being systematically managed owing to the absence of risk management systems. Thus, it was concluded that it was necessary to develop standard operating systems and implement risk management systems in order to manage risks effectively. Therefore, the purpose of this study was to develop a construction risk management system (CRMS for systematically managing risks. For this purpose, the field operation managers of CM firms were interviewed and surveyed in order to define risk factors. Upon this, a risk assessment priority analysis was performed. Finally, a risk management system that comprised seven modules and 20 sub-modules and was capable of responding systematically to risks was proposed. Furthermore, the effectiveness of this system was verified through on-site inspection. This system allows early response to risks, accountability verification and immediate response to legal disputes with clients by managing risk records.

  6. Information management system for KNGR

    International Nuclear Information System (INIS)

    Moon, Chankook; Yoo, Keunbae; Lee, Jinkie; Park, Jaemoon

    1996-01-01

    Information management system(IMS) is under development by Korea Electric Power COrporation(KEPCO) joined with KOrea Power Engineering Company(KOPEC) since early 1993 in accordance with Korean Next Generation Reactor(KNGR) project schedule, which is divided into three phases: Phase I(1993-1994), Phase II(1995-Feb.1998), Phase III(1998-2001). Necessity of creating IMS comes from two main purposes: one is from client requirement as described on Electric Power Research Institute(EPRI) Utility Requirement Document(URD) top-tier, the other is from supplier's need to improve productivity whatever it is motivated by management or working group. To satisfy both consumer's and producer's requirements we have set up goals of IMS, to provide configuration management based on network and reliable integrated data base through KNGR's life cycle: i.e.,chronologically, siting, designing, construction, operation and maintenance, and decommissioning. This paper will show what we have done to make the concept during Phase I, and what is a current problem and what will be done through Phase II and III

  7. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  8. Information management system for KNGR

    Energy Technology Data Exchange (ETDEWEB)

    Moon, Chankook; Yoo, Keunbae; Lee, Jinkie [Korea Electric Power Corporation, Seoul (Korea, Republic of); Park, Jaemoon [Korea Power Engineering Co., Inc., Daejeon (Korea, Republic of)

    1996-04-15

    Information management system(IMS) is under development by Korea Electric Power COrporation(KEPCO) joined with KOrea Power Engineering Company(KOPEC) since early 1993 in accordance with Korean Next Generation Reactor(KNGR) project schedule, which is divided into three phases: Phase I(1993-1994), Phase II(1995-Feb.1998), Phase III(1998-2001). Necessity of creating IMS comes from two main purposes: one is from client requirement as described on Electric Power Research Institute(EPRI) Utility Requirement Document(URD) top-tier, the other is from supplier's need to improve productivity whatever it is motivated by management or working group. To satisfy both consumer's and producer's requirements we have set up goals of IMS, to provide configuration management based on network and reliable integrated data base through KNGR's life cycle: i.e.,chronologically, siting, designing, construction, operation and maintenance, and decommissioning. This paper will show what we have done to make the concept during Phase I, and what is a current problem and what will be done through Phase II and III.

  9. Management Systems. Accounting and finance: Public Management

    OpenAIRE

    Martins, J. Albuquerque

    2005-01-01

    Traditionally the differences between the organizations of the public property sector and those of the private one are pointed out. In addition to the classic failures on both of these productive sectors, based on the organizational “500 Maiores e Melhores” operating in Portugal that are divergent in resources, in the present work any substantial differences amongst these sectors’ organizations have been found. Regarding the subject to the models of management, the present study corroborate s...

  10. Microcomputer Database Management Systems for Bibliographic Data.

    Science.gov (United States)

    Pollard, Richard

    1986-01-01

    Discusses criteria for evaluating microcomputer database management systems (DBMS) used for storage and retrieval of bibliographic data. Two popular types of microcomputer DBMS--file management systems and relational database management systems--are evaluated with respect to these criteria. (Author/MBR)

  11. Incorporating co-management within your environmental management system

    International Nuclear Information System (INIS)

    Melton, D.A.; Maher, S.

    1998-01-01

    The meaning of co-management in the renewable resource sector in terms of government and First Nations relations was explained. Co-management is a short term for co-operative management and has a formative history in the Northwest Territories, particularly in wildlife management. For example, co-management bridged the gap between the aboriginal way of hunting with those of the government. The aboriginal system was associated by self regulation based on traditional knowledge whereas the government system emphasized science, laws and regulations. At present, there are few examples of co-management in the oil and gas sector. This paper described the lessons that could be learned from previous examples of co-management and how those lessons might apply to an Environmental Management System (EMS) for the private oil and gas sector. 3 refs

  12. Transition Office Management and Accounting System

    Data.gov (United States)

    US Agency for International Development — TOMAS combined over 20 previously separate systems into one fully integrated management system covering budget, finance, procurement, travel, and emergency contact...

  13. Defense Contract Management Command Support to System Acquisition Program Managers

    National Research Council Canada - National Science Library

    1999-01-01

    .... This report discusses the planning of contract administration office support to system acquisition program managers through the program integration process and the customer support outreach program...

  14. DETERMINANTS OF QUALITY MANAGEMENT PRACTICES IN STIMULATING PRODUCT AND PROCESS INNOVATIONS

    Directory of Open Access Journals (Sweden)

    Boris Urban

    2017-12-01

    Full Text Available Research highlights Quality Management System (QMS has now become a recognizable guarantee of trust in certified business systems. A critical review of the literature reveals that empirical studies conducted to date have yielded conflicting findings on the relationship between quality management practices and innovation. This study empirically investigates how quality management principles may act as determinants of product and process innovations. The results show that customer focus and leadership explain a significant amount of product innovation, but not process innovation. Empirical support also finds that people management explains a significant amount of variance in both product innovation and process innovation. The findings highlight the importance of developing formal organisational mechanisms to measure levels of such quality determinants as they are easily overlooked or taken for granted. Moreover, firms need to recognise that innovation is a multi-faceted concept that can be controlled from a process or a product perspective, a distinction which is sometimes blurred.

  15. Designing an oil spill information management system

    International Nuclear Information System (INIS)

    Douligeris, C.; Collins, J.; Iakovou, E.; Sun, P.; Riggs, K.R.

    1995-01-01

    This paper presents the architectural design of OSIMS, an Oil Spill Information Management System, which is an integrated information management tool that consists of an object-relational database management system, an adaptive decision support system, an advanced visualization system (AVS) and a geographic information system (GIS). OSIMS will handle large and diverse databases of environmental, ecological, geographical, engineering, and regulatory information and will be used for risk analysis and contingency planning

  16. Designing an oil spill information management system

    Energy Technology Data Exchange (ETDEWEB)

    Douligeris, C.; Collins, J.; Iakovou, E.; Sun, P.; Riggs, K.R. [Univ. of Miami, Coral Gables, FL (United States)

    1995-12-31

    This paper presents the architectural design of OSIMS, an Oil Spill Information Management System, which is an integrated information management tool that consists of an object-relational database management system, an adaptive decision support system, an advanced visualization system (AVS) and a geographic information system (GIS). OSIMS will handle large and diverse databases of environmental, ecological, geographical, engineering, and regulatory information and will be used for risk analysis and contingency planning.

  17. Strategy Guideline: Quality Management in Existing Homes; Cantilever Floor Example

    Energy Technology Data Exchange (ETDEWEB)

    Taggart, J.; Sikora, J.; Wiehagen, J.; Wood, A.

    2011-12-01

    This guideline is designed to highlight the QA process that can be applied to any residential building retrofit activity. The cantilevered floor retrofit detailed in this guideline is included only to provide an actual retrofit example to better illustrate the QA activities being presented. The goal of existing home high performing remodeling quality management systems (HPR-QMS) is to establish practices and processes that can be used throughout any remodeling project. The research presented in this document provides a comparison of a selected retrofit activity as typically done versus that same retrofit activity approached from an integrated high performance remodeling and quality management perspective. It highlights some key quality management tools and approaches that can be adopted incrementally by a high performance remodeler for this or any high performance retrofit. This example is intended as a template and establishes a methodology that can be used to develop a portfolio of high performance remodeling strategies.

  18. FEATURES OF LOGISTIC SYSTEM ADAPTIVE MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Natalya VOZNENKO

    2015-08-01

    Full Text Available The study presents literature survey on enterprise logistic system adaptive management place and structure in the general enterprise management system. The theoretical basics of logistic system functioning, levels of its management and its effectiveness had been investigated. The role of adaptive management and its types had been scrutinized. The necessity of creating company’s adaptive regulator such as its economic mechanism had been proved.

  19. The Stress Management in the Enterprise Management System

    Directory of Open Access Journals (Sweden)

    Kuzmin Oleh Ye.

    2017-05-01

    Full Text Available The article systematizes the classification of the type of management by a number of attributes: horizon of ambition, priority style of interaction between management and managed systems, level of centralization, orientation, consideration of environmental impact, contents, type of activity, and response to deviation. Within terms of the attribute of response to deviations, place of the stress management is allocated near to the harmonic and the risk management. It has been substantiated that the stress management is the enterprise management system aimed at overcoming unwanted deviations that are significant, extreme, and have a significant negative impact on the operation of enterprise. In the structure of the stress management, the following integral components have been allocated and characterized: crisis, adaptive, reactive, fears, and anticipative.

  20. Integrated management system: expedience and organizational aspects

    Directory of Open Access Journals (Sweden)

    Trunova Ekaterina Viktorovna

    2011-06-01

    Full Text Available The correctly lined up management system is an important element of intellectual capital of company and promotes growth of its market value. In the article grounded, that realization of strategy is impossible without intercommunication of strategic management and business-process management. Such organizational aspects of administrative activity, as role conception of management, strategic office and process office, are observed.

  1. Business Management System Support Analysis

    Science.gov (United States)

    Parikh, Jay

    2008-01-01

    The purpose of this research project was to develop a searchable database compiled with internal and external audit findings/observations. The data will correspond to the findings and observations from the date of Center-wide implementation of the ISO 9001-2000 standard to the present (2003-2008). It was derived and extracted from several sources and was in multiple formats. Once extracted, categorization of the findings/observations would be possible. The final data was mapped to the ISO 9001-2000 standard with the understanding that it will be displayed graphically. The data will be used to verify trends, associate risks, and establish timelines to identify strengths and weaknesses to determine areas of improvement in the Kennedy Space Center Business Management System Internal Audit Program.

  2. Automated Transportation Management System (ATMS) Configuration Management Plan. Revision 1

    International Nuclear Information System (INIS)

    Weidert, R.S.

    1994-01-01

    This document describes the Software Configuration Management (SCM) approach and procedures to be utilized in developing and maintaining the Automated Transportation Management System (ATMS). The configuration management procedures are necessary to ensure that any changes made to software and related documentation are consistent with ATMS goals and contained securely in a central library. This plan applies to all software and associated documentation used in producing ATMS V1.0 and ATMS V2.0 system

  3. School Management Information Systems in Primary Schools

    Science.gov (United States)

    Demir, Kamile

    2006-01-01

    Developments in information technologies have been impacting upon educational organizations. Principals have been using management information systems to improve the efficiency of administrative services. The aim of this research is to explore principals' perceptions about management information systems and how school management information…

  4. A method and system for power management

    NARCIS (Netherlands)

    Burchard, Arthur Tadeusz; Goossens, Koos Gerard Willen; Milutinovic, A.; Molnos, Anca Mariana; Steffens, Elisabeth Francisca Maria

    2009-01-01

    A method and system for power management is provided. To control power supplied to a second electronic device (106), an electronic system (100) comprises a power management subsystem (110), a first electronic device (102); The power management subsystem (110) monitors the power consumed by the first

  5. Waste Management System Description Document (WMSD)

    International Nuclear Information System (INIS)

    1992-02-01

    This report is an appendix of the ''Waste Management Description Project, Revision 1''. This appendix is about the interim approach for the technical baseline of the waste management system. It describes the documentation and regulations of the waste management system requirements and description. (MB)

  6. The Air Program Information Management System (APIMS)

    Science.gov (United States)

    2011-11-02

    Technology November 2, 2011 The Air Program Information Management System (APIMS) Frank Castaneda, III, P.E. APIMS Program Manager AFCEE/TDNQ APIMS...NOV 2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE The Air Program Information Management System (APIMS... Information   Management   System : Sustainability of  Enterprise air quality management system • Aspects and Impacts to Process • Auditing and Measurement

  7. Electrofluidic systems for contrast management

    Science.gov (United States)

    Rebello, Keith J.; Maranchi, Jeffrey P.; Tiffany, Jason E.; Brown, Christopher Y.; Maisano, Adam J.; Hagedon, Matthew A.; Heikenfeld, Jason C.

    2012-06-01

    Operating in dynamic lighting conditions and in greatly varying backgrounds is challenging. Current paints and state-ofthe- art passive adaptive coatings (e.g. photochromics) are not suitable for multi- environment situations. A semi-active, low power, skin is needed that can adapt its reflective properties based on the background environment to minimize contrast through the development and incorporation of suitable pigment materials. Electrofluidic skins are a reflective display technology for electronic ink and paper applications. The technology is similar to that in E Ink but makes use of MEMS based microfluidic structures, instead of simple black and white ink microcapsules dispersed in clear oil. Electrofluidic skin's low power operation and fast switching speeds (~20 ms) are an improvement over current state-ofthe- art contrast management technologies. We report on a microfluidic display which utilizes diffuse pigment dispersion inks to change the contrast of the underlying substrate from 5.8% to 100%. Voltage is applied and an electromechanical pressure is used to pull a pigment dispersion based ink from a hydrophobic coated reservoir into a hydrophobic coated surface channel. When no voltage is applied, the Young-Laplace pressure pushes the pigment dispersion ink back down into the reservoir. This allows the pixel to switch from the on and off state by balancing the two pressures. Taking a systems engineering approach from the beginning of development has enabled the technology to be integrated into larger systems.

  8. Hanford Environmental Information System Configuration Management Plan

    International Nuclear Information System (INIS)

    1996-06-01

    The Hanford Environmental Information System (HEIS) Configuration Management Plan establishes the software and data configuration control requirements for the HEIS and project-related databases maintained within the Environmental Restoration Contractor's data management department

  9. Traffic Management Systems Performance Measurement: Final Report

    OpenAIRE

    Banks, James H.; Kelly, Gregory

    1997-01-01

    This report documents a study of performance measurement for Transportation Management Centers (TMCs). Performance measurement requirements were analyzed, data collection and management techniques were investigated, and case study traffic data system improvement plans were prepared for two Caltrans districts.

  10. Trust Management in Open Systems (TMOS)

    National Research Council Canada - National Science Library

    Jones, Vicki

    2002-01-01

    .... The problem considered in the Trust Management in Open Systems (TMOS) project is management of the exchange of sensitive credentials between strangers for the purpose of property-based authentication and authorization...

  11. Managers’ Use of Multiple Management Control Systems

    DEFF Research Database (Denmark)

    Willert, Jeanette

    This dissertation addresses the topic Management Control Systems (MCS) as a Package. Many research studies investigate management and control systems individually, whereas fewer research studies take a holistic view and include a larger part of all the MCS managers use to guide and direct...... subordinates behaviour in the best interest of their companies. In the MCS literature, it is stressed that knowledge is particularly lacking about how managers design and use MCS as a package, and the effectiveness of using the MCS. This dissertation responds to this call by carrying out a large survey among...... executive managers in large companies, a survey that investigates the subject: Effective Management and Control Systems. The focus in the survey is to explore how executive management in large companies design and use their management control systems package. Further, this study is supplemented...

  12. Automated attendance management and alert system | Rahim ...

    African Journals Online (AJOL)

    Automated attendance management and alert system. ... Journal of Fundamental and Applied Sciences ... AAMAS provides various functions, from managing and recording students' attendance record, to sending automatic alerts to students ...

  13. Potential of Computerized Maintenance Management System in Facilities Management

    Directory of Open Access Journals (Sweden)

    Noor Farisya Azahar

    2014-07-01

    Full Text Available For some time it has been clear that managing buildings or estates has been carried out in the context of what has become known as facilities management. British Institute of Facilities Management defined facilities management is the integration of multi-disciplinary activities within the built environment and the management of their impact upon people and the workplace. Effective facilities management is vital to the success of an organisation by contributing to the delivery of its strategic and operational objectives. Maintenance of buildings should be given serious attention before (stage design, during and after a building is completed. But total involvement in building maintenance is after the building is completed and during its operations. Residents of and property owners require their building to look attractive, durable and have a peaceful indoor environment and efficient. The objective of the maintenance management system is to stream line the vast maintenance information system to improve the productivity of an industrial plant. a good maintenance management system makes equipment and facilities available. This paper will discuss the fundamental steps of maintenance management program and Computerized Maintenance Management System (CMMS

  14. OCRWM Systems Engineering Management Plan (SEMP)

    International Nuclear Information System (INIS)

    1990-03-01

    The Nuclear Waste Policy Act of 1982 established the Office of Civilian Radioactive Waste Management (OCRWM) in the Department of Energy (DOE) to implement a program for the safe and permanent disposal of spent nuclear fuel and high-level radioactive waste. To achieve this objective, the OCRWM is developing an integrated waste-management system consisting of three elements: the transportation system, the monitored retrievable storage (MRS) facility, and the mined geologic disposal system (MGDS). The development of such a system requires management of many diverse disciplines that are involved in research, siting, design, licensing, and external interactions. The purpose of this Systems Engineering Management Plan (SEMP) is to prescribe how the systems-engineering process will be implemented in the development of the waste-management system. Systems engineering will be used by the OCRWM to manage, integrate, and document all aspects of the technical development of the waste-management system and its system elements to ensure that the requirements of the waste-management program are met. It will be applied to all technical activities of the OCRWM program. It will be used by the OCRWM to specify the sequence of technical activities necessary to define the requirements the waste-management system must satisfy, to develop the waste-management system, to relate system elements to each other, and to determine how the waste-management system can be optimized to most effectively satisfy the requirements. Furthermore, systems engineering will be used in the management of Program activities at the program, program-element, and project levels by specifying procedures, studies, reviews, and documentation requirements. 9 refs., 1 fig

  15. Quality management system in ISTC 'Ukryttia'

    International Nuclear Information System (INIS)

    Ershova, N.N.; Klyuchnikov, A.A.; Lagutin, I.G.

    2003-01-01

    Some structural and certification aspects of ISTC 'Ukryttia' quality system are seen,and main principles of adaptation of existing quality system model to quality management system model in conformity with ISO 9001:2000 standard are shown

  16. ISO 55000: Creating an asset management system.

    Science.gov (United States)

    Bradley, Chris; Main, Kevin

    2015-02-01

    In the October 2014 issue of HEJ, Keith Hamer, group vice-president, Asset Management & Engineering at Sodexo, and marketing director at Asset Wisdom, Kevin Main, argued that the new ISO 55000 standards present facilities managers with an opportunity to create 'a joined-up, whole lifecycle approach' to managing and delivering value from assets. In this article, Kevin Main and Chris Bradley, who runs various asset management projects, examine the process of creating an asset management system.

  17. INTEGRATIVE AUGMENTATION OF STANDARDIZED MANAGEMENT SYSTEMS

    Directory of Open Access Journals (Sweden)

    Stanislav Karapetrovic

    2008-03-01

    Full Text Available The development, features and integrating abilities of different international standards related to management systems are discussed. A group of such standards that augment the performance of quality management systems in organizations is specifically focused on. The concept, characteristics and an illustrative example of one augmenting standard, namely ISO 10001, are addressed. Integration of standardized augmenting systems, both by themselves and within the overall management system, is examined. It is argued that, in research and practice alike, integrative augmentation represents the future of standardized quality and other management systems.

  18. LCA of Solid Waste Management Systems

    DEFF Research Database (Denmark)

    Bakas, Ioannis; Laurent, Alexis; Clavreul, Julie

    2018-01-01

    The chapter explores the application of LCA to solid waste management systems through the review of published studies on the subject. The environmental implications of choices involved in the modelling setup of waste management systems are increasingly in the spotlight, due to public health...... concerns and new legislation addressing the impacts from managing our waste. The application of LCA to solid waste management systems, sometimes called “waste LCA”, is distinctive in that system boundaries are rigorously defined to exclude all life cycle stages except from the end-of-life. Moreover...... LCA on solid waste systems....

  19. Knowledge-based systems for power management

    Science.gov (United States)

    Lollar, L. F.

    1992-01-01

    NASA-Marshall's Electrical Power Branch has undertaken the development of expert systems in support of further advancements in electrical power system automation. Attention is given to the features (1) of the Fault Recovery and Management Expert System, (2) a resource scheduler or Master of Automated Expert Scheduling Through Resource Orchestration, and (3) an adaptive load-priority manager, or Load Priority List Management System. The characteristics of an advisory battery manager for the Hubble Space Telescope, designated the 'nickel-hydrogen expert system', are also noted.

  20. Radiation management computer system for Monju

    International Nuclear Information System (INIS)

    Aoyama, Kei; Yasutomo, Katsumi; Sudou, Takayuki; Yamashita, Masahiro; Hayata, Kenichi; Ueda, Hajime; Hosokawa, Hideo

    2002-01-01

    Radiation management of nuclear power research institutes, nuclear power stations and other such facilities are strictly managed under Japanese laws and management policies. Recently, the momentous issues of more accurate radiation dose management and increased work efficiency has been discussed. Up to now, Fuji Electric Company has supplied a large number of Radiation Management Systems to nuclear power stations and related nuclear facilities. We introduce the new radiation management computer system with adopted WWW technique for Japan Nuclear Cycle Development Institute, MONJU Fast Breeder Reactor (MONJU). (author)

  1. Tank waste remediation system configuration management plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents

  2. Tank waste remediation system risk management plan

    International Nuclear Information System (INIS)

    Zimmerman, B.D.

    1998-01-01

    The purpose of the Tank Waste Remediation System (TWRS) Risk Management Plan is to describe a consistent approach to risk management such that TWRS Project risks are identified and managed to achieve TWRS Project success. The Risk Management Plan implements the requirements of the Tank Waste Remediation System Systems Engineering Management Plan in the area of risk management. Figure ES-1 shows the relationship of the TWRS Risk Management Plan to other major TWRS Project documents. As the figure indicates, the Risk Management Plan is a tool used to develop and control TWRS Project work. It provides guidance on how TWRS Project risks will be assessed, analyzed, and handled, and it specifies format and content for the risk management lists, which are a primary product of the risk management process. In many instances, the Risk Management Plan references the TWRS Risk Management Procedure, which provides more detailed discussion of many risk management activities. The TWRS Risk Management Plan describes an ongoing program within the TWRS Project. The Risk Management Plan also provides guidance in support of the TWRS Readiness To-Proceed (RTP) assessment package

  3. Water management - management actions applied to water resources system

    International Nuclear Information System (INIS)

    Petkovski, Ljupcho; Tanchev, Ljubomir

    2001-01-01

    In this paper are presented a general description of water resource systems, a systematisation of the management tasks and the approaches for solution, including a review of methods used for solution of water management tasks and the fundamental postulates in the management. The management of water resources is a synonym for the management actions applied to water resource systems. It is a general term that unites planning and exploitation of the systems. The modern planning assumes separating the water racecourse part from the hydro technical part of the project. The water resource study is concerned with the solution for the resource problem. This means the parameters of the system are determined in parallel with the definition of the water utilisation regime. The hydro-technical part of the project is the design of structures necessary for the water resource solution. (Original)

  4. Managing Space System Faults: Coalescing NASA's Views

    Science.gov (United States)

    Muirhead, Brian; Fesq, Lorraine

    2012-01-01

    Managing faults and their resultant failures is a fundamental and critical part of developing and operating aerospace systems. Yet, recent studies have shown that the engineering "discipline" required to manage faults is not widely recognized nor evenly practiced within the NASA community. Attempts to simply name this discipline in recent years has been fraught with controversy among members of the Integrated Systems Health Management (ISHM), Fault Management (FM), Fault Protection (FP), Hazard Analysis (HA), and Aborts communities. Approaches to managing space system faults typically are unique to each organization, with little commonality in the architectures, processes and practices across the industry.

  5. An operation management system for golf tournament

    Directory of Open Access Journals (Sweden)

    Yuan Yijun

    2017-02-01

    Full Text Available In this paper,an operation management system for golf tournament is designed to calculate the beginning and finishing dates of the preparation automatically.The efficiency of management work during preparatory period,such as meetings before match and task announcement,is raised by nearly 40% after using our system than using traditional management tools or other software systems.And the probability of occurrence of delay and omission of work are controlled within 5%.It is proved to be helpful for reducing management costs and improving efficiency of tournament management company.

  6. Transport concept of new waste management system (inner packaging system)

    International Nuclear Information System (INIS)

    Hakozaki, K.; Wada, R.

    2004-01-01

    Kobe Steel, Ltd. (KSL) and Transnuclear Tokyo (TNT) have jointly developed a new waste management system concept (called ''Inner packaging system'') for high dose rate wastes generated from nuclear power plants under cooperation with Tokyo Electric Power Company (TEPCO). The inner packaging system is designed as a total management system dedicated to the wastes from nuclear plants in Japan, covering from the wastes conditioning in power plants up to the disposal in final repository. This paper presents the new waste management system concept

  7. Performance Enhancements for Advanced Database Management Systems

    OpenAIRE

    Helmer, Sven

    2000-01-01

    New applications have emerged, demanding database management systems with enhanced functionality. However, high performance is a necessary precondition for the acceptance of such systems by end users. In this context we developed, implemented, and tested algorithms and index structures for improving the performance of advanced database management systems. We focused on index structures and join algorithms for set-valued attributes.

  8. Nuclear power project management information system

    International Nuclear Information System (INIS)

    Zou Lailong; Zhang Peng; Xiao Ziyan; Chun Zengjun; Huang Futong

    2001-01-01

    Project Management Information System is an important infrastructure facility for the construction and operation of Nuclear Power Station. Based on the practice of Lingao nuclear power project management information system (NPMIS), the author describes the NPMIS design goals, system architecture and software functionality, points out the outline issues during the development and deployment of NPMIS

  9. Assessing waste management systems using reginalt software

    International Nuclear Information System (INIS)

    Meshkov, N.K.; Camasta, S.F.; Gilbert, T.L.

    1988-03-01

    A method for assessing management systems for low-level radioactive waste is being developed for US Department of Energy. The method is based on benefit-cost-risk analysis. Waste management is broken down into its component steps, which are generation, treatment, packaging, storage, transportation, and disposal. Several different alternatives available for each waste management step are described. A particular waste management system consists of a feasible combination of alternatives for each step. Selecting an optimal waste management system would generally proceed as follows: (1) qualitative considerations are used to narrow down the choice of waste management system alternatives to a manageable number; (2) the costs and risks for each of these system alternatives are evaluated; (3) the number of alternatives is further reduced by eliminating alternatives with similar risks but higher costs, or those with similar costs but higher risks; (4) a trade-off factor between cost and risk is chosen and used to compute the objective function (sum of the cost and risk); and (5) the selection of the optimal waste management system among the remaining alternatives is made by choosing the alternative with the smallest value for the objective function. The authors propose that the REGINALT software system, developed by EG and G Idaho, Inc., as an acid for managers of low-level commerical waste, be augmented for application to the managment of DOE-generated waste. Specific recommendations for modification of the REGINALT system are made. 51 refs., 3 figs., 2 tabs

  10. An operation management system for golf tournament

    OpenAIRE

    Yuan Yijun; Luo Hanwen

    2017-01-01

    In this paper,an operation management system for golf tournament is designed to calculate the beginning and finishing dates of the preparation automatically.The efficiency of management work during preparatory period,such as meetings before match and task announcement,is raised by nearly 40% after using our system than using traditional management tools or other software systems.And the probability of occurrence of delay and omission of work are controlled within 5%.It is proved to be helpful...

  11. Electronic Resources Management System: Recommendation Report 2017

    KAUST Repository

    Ramli, Rindra M.

    2017-05-01

    This recommendation report provides an overview of the selection process for the new Electronic Resources Management System. The library has decided to move away from Innovative Interfaces Millennium ERM module. The library reviewed 3 system as potential replacements namely: Proquest 360 Resource Manager, Ex Libris Alma and Open Source CORAL ERMS. After comparing and trialling the systems, it was decided to go for Proquest 360 Resource Manager.

  12. Destination Information Management System for Tourist

    OpenAIRE

    Abdulhamid, Shafii Muhammad; Usman, Gana

    2014-01-01

    The use of information and communication technology in our day to day activities is now unavoidable. In tourism developments, destination information and management systems are used to guide visitors and provide information to both visitors and management of the tour sites. In this paper, information and navigation system was designed for tourists, taking some Niger state of Nigeria tourism destinations into account. The information management system was designed using Java Applet (NetBeans I...

  13. Software And Systems Engineering Risk Management

    Science.gov (United States)

    2010-04-01

    RSKM 2004 COSO Enterprise RSKM Framework 2006 ISO/IEC 16085 Risk Management Process 2008 ISO/IEC 12207 Software Lifecycle Processes 2009 ISO/IEC...1 Software And Systems Engineering Risk Management John Walz VP Technical and Conferences Activities, IEEE Computer Society Vice-Chair Planning...Software & Systems Engineering Standards Committee, IEEE Computer Society US TAG to ISO TMB Risk Management Working Group Systems and Software

  14. Management system, organizational climate and performance relationships

    Science.gov (United States)

    Davis, B. D.

    1979-01-01

    Seven aerospace firms were investigated to determine if a relationship existed among management systems, organizational climate, and organization performance. Positive relationships were found between each of these variables, but a statistically significant relationship existed only between the management system and organizational climate. The direction and amount of communication and the degree of decentralized decision-making, elements of the management system, also had a statistically significant realtionship with organization performance.

  15. A model for international border management systems.

    Energy Technology Data Exchange (ETDEWEB)

    Duggan, Ruth Ann

    2008-09-01

    To effectively manage the security or control of its borders, a country must understand its border management activities as a system. Using its systems engineering and security foundations as a Department of Energy National Security Laboratory, Sandia National Laboratories has developed such an approach to modeling and analyzing border management systems. This paper describes the basic model and its elements developed under Laboratory Directed Research and Development project 08-684.

  16. Waste Management System Requirement document

    International Nuclear Information System (INIS)

    1990-04-01

    This volume defines the top level technical requirements for the Monitored Retrievable Storage (MRS) facility. It is designed to be used in conjunction with Volume 1, General System Requirements. Volume 3 provides a functional description expanding the requirements allocated to the MRS facility in Volume 1 and, when appropriate, elaborates on requirements by providing associated performance criteria. Volumes 1 and 3 together convey a minimum set of requirements that must be satisfied by the final MRS facility design without unduly constraining individual design efforts. The requirements are derived from the Nuclear Waste Policy Act of 1982 (NWPA), the Nuclear Waste Policy Amendments Act of 1987 (NWPAA), the Environmental Protection Agency's (EPA) Environmental Standards for the Management and Disposal of Spent Nuclear Fuel (40 CFR 191), NRC Licensing Requirements for the Independent Storage of Spent Nuclear and High-Level Radioactive Waste (10 CFR 72), and other federal statutory and regulatory requirements, and major program policy decisions. This document sets forth specific requirements that will be fulfilled. Each subsequent level of the technical document hierarchy will be significantly more detailed and provide further guidance and definition as to how each of these requirements will be implemented in the design. Requirements appearing in Volume 3 are traceable into the MRS Design Requirements Document. Section 2 of this volume provides a functional breakdown for the MRS facility. 1 tab

  17. University Program Management Information System

    Science.gov (United States)

    Gans, Gary (Technical Monitor)

    2004-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  18. University Program Management Information System

    Science.gov (United States)

    2001-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA' objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  19. Managing geometric information with a data base management system

    Science.gov (United States)

    Dube, R. P.

    1984-01-01

    The strategies for managing computer based geometry are described. The computer model of geometry is the basis for communication, manipulation, and analysis of shape information. The research on integrated programs for aerospace-vehicle design (IPAD) focuses on the use of data base management system (DBMS) technology to manage engineering/manufacturing data. The objectives of IPAD is to develop a computer based engineering complex which automates the storage, management, protection, and retrieval of engineering data. In particular, this facility must manage geometry information as well as associated data. The approach taken on the IPAD project to achieve this objective is discussed. Geometry management in current systems and the approach taken in the early IPAD prototypes are examined.

  20. Sustainable Soil Water Management Systems

    OpenAIRE

    Basch, G.; Kassam, A.; Friedrich, T.; Santos, F.L.; Gubiani, P.I.; Calegari, A.; Reichert, J.M.; dos Santos, D.R.

    2012-01-01

    Soil quality and its management must be considered as key elements for an effective management of water resources, given that the hydrological cycle and land management are intimately linked (Bossio et al. 2007). Soil degradation has been described by Bossio et al. (2010) as the starting point of a negative cycle of soil-water relationships, creating a positive, self-accelerating feedback loop with important negative impacts on water cycling and water productivity. Therefore, sustainable soil...

  1. Method for Business Process Management System Selection

    OpenAIRE

    Westelaken, van de, Thijs; Terwee, Bas; Ravesteijn, Pascal

    2013-01-01

    In recent years business process management (BPM) and specifically information systems that support the analysis, design and execution of processes (also called business process management systems (BPMS)) are getting more attention. This has lead to an increase in research on BPM and BPMS. However the research on BPMS is mostly focused on the architecture of the system and how to implement such systems. How to select a BPM system that fits the strategy and goals of a specific organization is ...

  2. Automated transportation management system (ATMS) software project management plan (SPMP)

    Energy Technology Data Exchange (ETDEWEB)

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  3. Information Systems Coordinate Emergency Management

    Science.gov (United States)

    2012-01-01

    -changing planet. This information can be captured, analyzed, and visualized by geographic information systems (GIS) to produce maps, charts, and other tools that can reveal information essential to a wide variety of applications including emergency management. Knowing precise, real-time information about the size, location, environmental conditions, and resulting damage of an event like a flood or wildfire as well as the location and numbers of emergency responders and other resources contributes directly to the effectiveness of disaster mitigation. The need for such information is also evident when responding to homeland security threats, such as a terrorist attack. Recognizing the value of its geospatial information resources for this and other purposes, in 1998 Stennis and the state of Mississippi partnered to form what became the Enterprise for Innovative Geospatial Solutions (EIGS) industry cluster, supporting the growth of remote sensing and GIS-based research and business. As part of EIGS, several companies partnered with NASA through dual use and Small Business Innovation Research (SBIR) contracts. Among those was NVision.

  4. Efficiency analysis system of material management

    Directory of Open Access Journals (Sweden)

    Bogusław Śliwczyński

    2012-12-01

    Full Text Available Background: Significant scope of enterprise's efficiency management is improving of material management process both the strategic and operational level. The complexity of material flow processes can lead to a threat such as distraction and disintegration of analysis focusing on many different factors influenced on effective sourcing and procurement management, transport and warehousing processes, inventory management, working capital and cash flow management. Material and methods: The presented article focuses on multidimensional and multi-criteria analysis of material management efficiency that is considered as decision support system. Authors have presented results of the research regarding ineffective material management confirm insufficient analytical supporting in various decisions of procurement operations. Results and conclusions: Based on research results authors presented in the article model of efficiency analysis system of material management.

  5. Investigating Pu and U isotopic compositions in sediments: a case study in Lake Obuchi, Rokkasho Village, Japan using sector-field ICP-MS and ICP-QMS.

    Science.gov (United States)

    Zheng, Jian; Yamada, Masatoshi

    2005-08-01

    The objectives of the present work were to study isotope ratios and the inventory of plutonium and uranium isotope compositions in sediments from Lake Obuchi, which is in the vicinity of several nuclear fuel facilities in Rokkasho, Japan. Pu and its isotopes were determined using sector-field ICP-MS and U and its isotopes were determined with ICP-QMS after separation and purification with a combination of ion-exchange and extraction chromatography. The observed (240)Pu/(239)Pu atom ratio (0.186 +/- 0.016) was similar to that of global fallout, indicating that the possible early tropospheric fallout Pu did not deliver Pu from the Pacific Proving Ground to areas above 40 degrees N. The previously reported higher Pu inventory in the deep water area of Lake Obuchi could be attributed to the lateral transportation of Pu deposited in the shallow area which resulted from the migration of deposited global fallout Pu from the land into the lake by river runoff and from the Pacific Ocean by tide movement and sea water scavenging, as well as from direct soil input by winds. The (235)U/(238)U atom ratios ranged from 0.00723 to 0.00732, indicating the natural origin of U in the sediments. The average (234)U/(238)U activity ratio of 1.11 in a sediment core indicated a significant sea water U contribution. No evidence was found for the release of U containing wastes from the nearby nuclear facilities. These results will serve as a reference baseline on the levels of Pu and U in the studied site so that any further contamination from the spent nuclear fuel reprocessing plants, the radioactive waste disposal and storage facilities, and the uranium enrichment plant can be identified, and the impact of future release can be rapidly assessed.

  6. ORGANIZATIONAL THEORY, SYSTEMIC THINKING AND SYSTEM MANAGEMENT

    OpenAIRE

    Shahram Mirzaie Daryani; Samad Aali; Ahmad Asli-zadeh

    2012-01-01

    Organizational theory offers effective ways of thinking to researchers and practitioners who are interested in this field of study. This knowledge helps managers make organizational behavior more efficient through analyzing complex situations and developing effective tools to resolve them. In other words, it opens human’s mind to different aspects of life both inside and outside of the organization. Therefore, the value of organizational theory is in changing managers' thinking ways, thought ...

  7. Waste Management Information System (WMIS) User Guide

    International Nuclear Information System (INIS)

    Broz, R.E.

    2008-01-01

    This document provides the user of the Waste Management Information System (WMIS) instructions on how to use the WMIS software. WMIS allows users to initiate, track, and close waste packages. The modular design supports integration and utilization of data through the various stages of waste management. The phases of the waste management work process include generation, designation, packaging, container management, procurement, storage, treatment, transportation, and disposal

  8. Waste Management Information System (WMIS) User Guide

    Energy Technology Data Exchange (ETDEWEB)

    R. E. Broz

    2008-12-22

    This document provides the user of the Waste Management Information System (WMIS) instructions on how to use the WMIS software. WMIS allows users to initiate, track, and close waste packages. The modular design supports integration and utilization of data throuh the various stages of waste management. The phases of the waste management work process include generation, designation, packaging, container management, procurement, storage, treatment, transportation, and disposal.

  9. System safety education focused on system management

    Science.gov (United States)

    Grose, V. L.

    1971-01-01

    System safety is defined and characteristics of the system are outlined. Some of the principle characteristics include role of humans in hazard analysis, clear language for input and output, system interdependence, self containment, and parallel analysis of elements.

  10. FORMATION OF THE ENTERPRISE COSTS MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Borysiuk Iryna

    2018-01-01

    Full Text Available Introduction. The paper deals with the actual issues of formation of the enterprise management system costs, because in the conditions of an unstable market environment the financial performance depends on the efficiency of the cost management system, competitiveness, financial sustainability and investment attractiveness of any subject of economic activity. Purpose of the article is consolidation of approaches to cost management, theoretical substantiation and development of recommendations regarding the formation of the enterprise cost management system. Results. Development of an enterprise cost management system based on research on the essence and cost management approaches. The goals, tasks, principles, methods, tools, functions and main elements of the cost management system were determined, factors of the external and internal environment of the enterprise, that affect the system of its costs management. Conclusions. Formation of integrated cost management system ensures the successful company operation on the market, production of competitive products based on costs and prices optimization and making a profit, increase of the reasonableness of making managerial decisions.

  11. Marine biological data and information management system

    Digital Repository Service at National Institute of Oceanography (India)

    Sarupria, J.S.

    Indian National Oceanographic Data Centre (INODC) is engaged in developing a marine biological data and information management system (BIODIMS). This system will contain the information on zooplankton in the water column, zoobenthic biomass...

  12. Electronic Resources Management System: Recommendation Report 2017

    KAUST Repository

    Ramli, Rindra M.

    2017-01-01

    This recommendation report provides an overview of the selection process for the new Electronic Resources Management System. The library has decided to move away from Innovative Interfaces Millennium ERM module. The library reviewed 3 system

  13. Descriptions of Transit Maintenance Management Information Systems

    Science.gov (United States)

    1984-10-01

    This 289-page report presents an overview of ten maintenance management information systems that are currently operational or near-operational on minicomputers or microcomputers. The systems described address one or more of the following concerns: co...

  14. I-15 integrated corridor management : system requirements.

    Science.gov (United States)

    2011-07-01

    This document is intended as a listing and discussion of the Requirements for the I-15 Integrated Corridor Management System : (ICMS) Demonstration Project in San Diego. This document describes what the system is to do (the functional requirements), ...

  15. The PDS4 Metadata Management System

    Science.gov (United States)

    Raugh, A. C.; Hughes, J. S.

    2018-04-01

    We present the key features of the Planetary Data System (PDS) PDS4 Information Model as an extendable metadata management system for planetary metadata related to data structure, analysis/interpretation, and provenance.

  16. Software for Intelligent System Health Management

    Science.gov (United States)

    Trevino, Luis C.

    2004-01-01

    This viewgraph presentation describes the characteristics and advantages of autonomy and artificial intelligence in systems health monitoring. The presentation lists technologies relevant to Intelligent System Health Management (ISHM), and some potential applications.

  17. A Blood Bank Information Management System

    Science.gov (United States)

    Farmer, James J.

    1982-01-01

    A computerized Blood Bank Management system is described. Features include product oriented data input, inventory control reports, product utilization reports, rapid retrieval of individual patient reports. Relative benefits of the system are discussed.

  18. Planning for impact management: a systems perspective

    International Nuclear Information System (INIS)

    Leistritz, F.L.; Halstead, J.M.; Chase, R.A.; Murdock, S.H.

    1983-01-01

    The authors develop a conceptual basis for viewing impact events and their subsequent management, and thus for designing impact management programs. Following an examination of the pragmatic rationales for an impact management program for large-scale projects, such as a nuclear waste repository, they discuss the interrelated nature of impact events that clarify the need for an integrated systems-orientated socioeconomic impact management framework. They then present the key components of such a system and discusss its implementation. Although a concerted systems approach is difficult to implement and is complex in design, it will be more difficult to complete the repository siting process without one. 4 tables

  19. Energy Management of Smart Distribution Systems

    Science.gov (United States)

    Ansari, Bananeh

    Electric power distribution systems interface the end-users of electricity with the power grid. Traditional distribution systems are operated in a centralized fashion with the distribution system owner or operator being the only decision maker. The management and control architecture of distribution systems needs to gradually transform to accommodate the emerging smart grid technologies, distributed energy resources, and active electricity end-users or prosumers. The content of this document concerns with developing multi-task multi-objective energy management schemes for: 1) commercial/large residential prosumers, and 2) distribution system operator of a smart distribution system. The first part of this document describes a method of distributed energy management of multiple commercial/ large residential prosumers. These prosumers not only consume electricity, but also generate electricity using their roof-top solar photovoltaics systems. When photovoltaics generation is larger than local consumption, excess electricity will be fed into the distribution system, creating a voltage rise along the feeder. Distribution system operator cannot tolerate a significant voltage rise. ES can help the prosumers manage their electricity exchanges with the distribution system such that minimal voltage fluctuation occurs. The proposed distributed energy management scheme sizes and schedules each prosumer's ES to reduce the electricity bill and mitigate voltage rise along the feeder. The second part of this document focuses on emergency energy management and resilience assessment of a distribution system. The developed emergency energy management system uses available resources and redundancy to restore the distribution system's functionality fully or partially. The success of the restoration maneuver depends on how resilient the distribution system is. Engineering resilience terminology is used to evaluate the resilience of distribution system. The proposed emergency energy

  20. Introduction to data base management systems

    International Nuclear Information System (INIS)

    Rossiter, B.N.

    1984-01-01

    Data base management systems offer considerable advantages over elementary filing systems under favourable circumstances such as where data structures and applications are continually changing. The architecture of such systems and the manner in which they work is described, with particular attention to data independence. An introduction is made to the classification of data base management systems by the data structuring models that they employ. (orig.)

  1. Reexamining Operating System Support for Database Management

    OpenAIRE

    Vasil, Tim

    2003-01-01

    In 1981, Michael Stonebraker [21] observed that database management systems written for commodity operating systems could not effectively take advantage of key operating system services, such as buffer pool management and process scheduling, due to expensive overhead and lack of customizability. The “not quite right” fit between these kernel services and the demands of database systems forced database designers to work around such limitations or re-implement some kernel functionality in user ...

  2. Safety Management System in Croatia Control Ltd.

    OpenAIRE

    Pavlin, Stanislav; Sorić, Vedran; Bilać, Dragan; Dimnik, Igor; Galić, Daniel

    2009-01-01

    International Civil Aviation Organization and other international aviation organizations regulate the safety in civil aviation. In the recent years the International Civil Aviation Organization has introduced the concept of the safety management system through several documents among which the most important is the 2006 Safety Management Manual. It treats the safety management system in all the segments of civil aviation, from carriers, aerodromes and air traffic control to design, constructi...

  3. Region 7 Laboratory Information Management System

    Science.gov (United States)

    This is metadata documentation for the Region 7 Laboratory Information Management System (R7LIMS) which maintains records for the Regional Laboratory. Any Laboratory analytical work performed is stored in this system which replaces LIMS-Lite, and before that LAST. The EPA and its contractors may use this database. The Office of Policy & Management (PLMG) Division at EPA Region 7 is the primary managing entity; contractors can access this database but it is not accessible to the public.

  4. Existence crises of actual financial management systems

    OpenAIRE

    SVASTA Mihai

    2009-01-01

    The present financial management systems reflects only partially the economic reality and they are no longer able to act as an instrument for the management. It is absurd that an economy populated by business models based on 21st century technology to use financial management systems based mainly on the same principles formalised by Luca Paciolli in 1494. Therefore, one of the causes of the current economic crisis could be the lack of coordination between the evolution of the business models ...

  5. Mine railway equipments management information system

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, X.; Han, K.; Duan, T.; Liu, Z.; Lu, H. [China University of Mining and Technology, Xuzhou (China)

    2007-06-15

    Based on client/server and browser/server models, the management information system described realized the entire life-cycle management of mine railway equipment which included universal equipment and special equipment in the locomotive depot, track maintenance division, electrical depot and car depot. The system has other online functions such as transmitting reports, graphics management, statistics, searches, graphics wizard and web propaganda. It was applied in Pingdingshan Coal Co. Ltd.'s Railway Transport Department. 5 refs., 4 figs.

  6. Treatment system operation, management, and finance

    Energy Technology Data Exchange (ETDEWEB)

    Truax, D.D. (Mississippi State Univ., Mississippi State (United States))

    1990-06-01

    This article deals with literature on operation, management, and financing of wastewater treatment plants. Some topics discussed are system hydraulics and flow monitoring, odor, reliability, equipment age, management philosophy, performance, reducing operating cost, planning and response to emergencies, preventative maintenance, inspection systems, mechanical vibrations, safety, privatization, municipal leasing, user and impact fees.

  7. Disconnect Between Public Sector Management System and ...

    African Journals Online (AJOL)

    three regional governments, this article exposes how public sector management system (public finance and human resource management system) determines decentralization outcomes. It contends that outcomes of decentralization reforms are shaped not only by political and economic factors, as suggested in the ...

  8. Assessment of laboratory logistics management information system ...

    African Journals Online (AJOL)

    Introduction: Logistics management information system for health commodities remained poorly implemented in most of developing countries. To assess the status of laboratory logistics management information system for HIV/AIDS and tuberculosis laboratory commodities in public health facilities in Addis Ababa. Methods: ...

  9. INDUSTRIAL ENTERPRISE MANAGEMENT SYSTEM QUALITY ASSESMENT

    Directory of Open Access Journals (Sweden)

    S. V. Pankov

    2012-01-01

    Full Text Available Management systems of small-scale enterprises in Moscow region are of centralized linear type. Misunderstanding of the need for qualitymanagement operational processes is observed in such business structures. Using correct management systems results in reduction of business costs and increase of business economic efficiency and entrepreneurship social role.

  10. Public Management Information Systems: Theory and Prescription.

    Science.gov (United States)

    Bozeman, Barry; Bretschneider, Stuart

    1986-01-01

    The existing theoretical framework for research in management information systems (MIS) is criticized for its lack of attention to the external environment of organizations, and a new framework is developed which better accommodates MIS in public organizations: public management information systems. Four models of publicness that reflect external…

  11. Environmental management systems in South Africa

    DEFF Research Database (Denmark)

    Jørgensen, Tine Herreborg; Smink, Carla

    2004-01-01

    The article presents som empirical findings regarding environmental management systems of four companies in the automotive industry in South Africa.......The article presents som empirical findings regarding environmental management systems of four companies in the automotive industry in South Africa....

  12. Knowledge Management System Model for Learning Organisations

    Science.gov (United States)

    Amin, Yousif; Monamad, Roshayu

    2017-01-01

    Based on the literature of knowledge management (KM), this paper reports on the progress of developing a new knowledge management system (KMS) model with components architecture that are distributed over the widely-recognised socio-technical system (STS) aspects to guide developers for selecting the most applicable components to support their KM…

  13. Career management in the healthcare system

    OpenAIRE

    Pusa Tania Tapliga; Roxana Nicoleta Matei

    2014-01-01

    Career management is a specialized activity that provides the relation between HRM and the individual and organizational career planning. The health system is changing, more than any other field. Career Management in the health care system involves a complex process of analysis and human resource planning at both the organizational and the individual level.

  14. Method for Business Process Management System Selection

    NARCIS (Netherlands)

    Thijs van de Westelaken; Bas Terwee; Pascal Ravesteijn

    2013-01-01

    In recent years business process management (BPM) and specifically information systems that support the analysis, design and execution of processes (also called business process management systems (BPMS)) are getting more attention. This has lead to an increase in research on BPM and BPMS. However

  15. ITS data management system : year one activities

    Science.gov (United States)

    1997-08-01

    This report documents research conducted in the development of an ITS data management system, hereafter referred to as ITS DataLink. The objective of the ITS DataLink system is to retain, manage, share, and analyze ITS data for a variety of tra...

  16. African Traditional Knowledge Systems and Biodiversity Management

    African Journals Online (AJOL)

    There is a link between African Traditional Knowledge Systems and the management of Biodiversity. These have been passed over from one generation to the next through oral tradition. The lack of documentation of these systems of managing biodiversity has led to the existence of a gap between the scientifi cally based ...

  17. Social responsibility as a management system

    Directory of Open Access Journals (Sweden)

    Nuria Arimany-Serrat

    2018-02-01

    Originality/value: The study identifies a business management system that continuously organises and improves the performances of a company in the area of Corporate Social Responsibility, through audited certification that enhances the competitivity of companies that hold the international standard. The study also demonstrates the need for a management system to integrate into business models.

  18. The LHCb Data Management System

    CERN Multimedia

    CERN. Geneva

    2012-01-01

    We shall describe all the tools that are available for Data Management, from handling of large datasets to basic tools for users as well as for monitoring the dynamic behaviour of LHCb Storage capacity.

  19. Integrating Process Management with Archival Management Systems: Lessons Learned

    Directory of Open Access Journals (Sweden)

    J. Gordon Daines, III

    2009-03-01

    Full Text Available The Integrated Digital Special Collections (INDI system is a prototype of a database-driven, Web application designed to automate and manage archival workflow for large institutions and consortia. This article discusses the how the INDI project enabled the successful implementation of a process to manage large technology projects in the Harold B. Lee Library at Brigham Young University. It highlights how the scope of these technology projects is set and how the major deliverables for each project are defined. The article also talks about how the INDI system followed the process and still failed to be completed. It examines why the process itself is successful and why the INDI project failed. It further underscores the importance of process management in archival management systems.

  20. Integrated management systems in the nuclear field

    International Nuclear Information System (INIS)

    Beckmerhagen, I.A.; Berg, H.P.; Karapetrovic, S.V.; Willborn, W.O.

    2005-01-01

    In the last years several internationally accepted standards such as the ISO 9000 and ISO 14000 series and other function-specific management systems standards have been developed. At the same time, it has become imperative for organisations to continuously improve their overall quality, environmental and safety performance. Therefore, the need to create integrated management systems is of growing importance to enable an easier handling of the different management systems. This paper has two main objectives. The first one is to address the key issues in the underlying theory of integrated management systems including benefits and limits, the second one is to illustrate the importance of an integrated (in particular safety) management system and the experience feedback providing examples from different areas and different organisations in the nuclear field. (orig.)

  1. Configuration Management Program - a part of Integrated Management System

    International Nuclear Information System (INIS)

    Mancev, Bogomil; Yordanova, Vanja; Nenkova, Boyka

    2014-01-01

    The recently issued International Atomic Energy Agency (IAEA) publications (GS-R-3, GS-G-3.1 and GS-G-3.5) regarding Management Systems for Facilities and Activities define requirements for creation, introduction, evaluation and continuously improvement of the Management System, which unifies the safety, health, environment, security, quality and economic elements. According to GS-R-3 the Integrated Management System is based on defined processes identified in the enterprises: Managing, Basic and Supporting processes. At implementation of their activities, the organizations often apply other standards in their interrelations with suppliers and the parties concerned - ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007, regarding quality, environment and occupational health and safety management. The integration of the standards of both series ensure the observance of the common management principles that reflect the best practices of management as leadership, participation of the people, process approach, continuously improvement, systematical approach to the management and approach based on facts used at the making decisions. The main objective of the Integrated Management System introduction is to ensure safety considering the influence of all additional impacts taken together. The Integrated Management System is based on the process approach at implementation of the activities in nuclear power plant. The transition to the process oriented approach require long period of time, during which the distribution of the responsibilities is optimized up to the level that will satisfy the requirements, reach and maintain the stipulated objectives. The Configuration Management (CM) is an integrated management process by means of which conformity between design requirements, physical configuration and the plant documentation is ascertained and maintained during the entire life cycle of the facility. Processes within configuration management are not isolated, but are part of

  2. Municipal solid waste management system: decision support through systems analysis

    OpenAIRE

    Pires, Ana Lúcia Lourenço

    2010-01-01

    Thesis submitted to the Universidade Nova de Lisboa, Faculdade de Ciências e Tecnologia for the degree of Doctor of Philosophy in Environmental Engineering The present study intends to show the development of systems analysis model applied to solid waste management system, applied into AMARSUL, a solid waste management system responsible for the management of municipal solid waste produced in Setúbal peninsula, Portugal. The model developed intended to promote sustainable decision making, ...

  3. Management system requirements for small reactors

    Energy Technology Data Exchange (ETDEWEB)

    Jones, K.A., E-mail: kenneth.jones@cnsc-ccsn.gc.ca [Canadian Nuclear Safety Commission, Ottawa, Ontario (Canada)

    2013-07-01

    This abstract identifies the management system requirements for the life cycle of small reactors from initial conception through completion of decommissioning. For small reactors, the requirements for management systems remain the same as those for 'large' reactors regardless of the licensee' business model and objectives. The CSA N-Series of standards provides an interlinked set of requirements for the management of nuclear facilities. CSA N286 provides overall direction to management to develop and implement sound management practices and controls, while other CSA nuclear standards provide technical requirements and guidance that support the management system. CSA N286 is based on a set of principles. The principles are then supported by generic requirements that are applicable to the life cycle of nuclear facilities. CNSC regulatory documents provide further technical requirements and guidance. (author)

  4. Sequencing Information Management System (SIMS). Final report

    Energy Technology Data Exchange (ETDEWEB)

    Fields, C.

    1996-02-15

    A feasibility study to develop a requirements analysis and functional specification for a data management system for large-scale DNA sequencing laboratories resulted in a functional specification for a Sequencing Information Management System (SIMS). This document reports the results of this feasibility study, and includes a functional specification for a SIMS relational schema. The SIMS is an integrated information management system that supports data acquisition, management, analysis, and distribution for DNA sequencing laboratories. The SIMS provides ad hoc query access to information on the sequencing process and its results, and partially automates the transfer of data between laboratory instruments, analysis programs, technical personnel, and managers. The SIMS user interfaces are designed for use by laboratory technicians, laboratory managers, and scientists. The SIMS is designed to run in a heterogeneous, multiplatform environment in a client/server mode. The SIMS communicates with external computational and data resources via the internet.

  5. Nova laser assurance-management system

    International Nuclear Information System (INIS)

    Levy, A.J.

    1983-01-01

    In a well managed project, Quality Assurance is an integral part of the management activities performed on a daily basis. Management assures successful performance within budget and on schedule by using all the good business, scientific, engineering, quality assurance, and safety practices available. Quality assurance and safety practices employed on Nova are put in perspective by integrating them into the overall function of good project management. The Nova assurance management system was developed using the quality assurance (QA) approach first implemented at LLNL in early 1978. The LLNL QA program is described as an introduction to the Nova assurance management system. The Nova system is described pictorially through the Nova configuration, subsystems and major components, interjecting the QA techniques which are being pragmatically used to assure the successful completion of the project

  6. Expert Systems for auditing management information systems

    Directory of Open Access Journals (Sweden)

    Gheroghe Popescu

    2007-05-01

    Full Text Available Expert systems are built with the help of: specialised programming languages or expert system generators (shell. But this structure was reached after tens of years of work and research, because expert systems are nothing but pragmatic capitalisation of the results of research carried out in artificial intelligence and theory of knowledge.

  7. Fims, forestry information management system: An overview

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    This geographic information system has been developed as part of Forestry Canada's Eastern Quebec Forestry Program for woodlot owners in eastern Quebec. The goal was to provide private woodlot operators with a management system that uses the most advanced technology available. This booklet provides an overview of this system, explaining how the system can be used.

  8. Integrated System Health Management Development Toolkit

    Science.gov (United States)

    Figueroa, Jorge; Smith, Harvey; Morris, Jon

    2009-01-01

    This software toolkit is designed to model complex systems for the implementation of embedded Integrated System Health Management (ISHM) capability, which focuses on determining the condition (health) of every element in a complex system (detect anomalies, diagnose causes, and predict future anomalies), and to provide data, information, and knowledge (DIaK) to control systems for safe and effective operation.

  9. Model-based version management system framework

    International Nuclear Information System (INIS)

    Mehmood, W.

    2016-01-01

    In this paper we present a model-based version management system. Version Management System (VMS) a branch of software configuration management (SCM) aims to provide a controlling mechanism for evolution of software artifacts created during software development process. Controlling the evolution requires many activities to perform, such as, construction and creation of versions, identification of differences between versions, conflict detection and merging. Traditional VMS systems are file-based and consider software systems as a set of text files. File based VMS systems are not adequate for performing software configuration management activities such as, version control on software artifacts produced in earlier phases of the software life cycle. New challenges of model differencing, merge, and evolution control arise while using models as central artifact. The goal of this work is to present a generic framework model-based VMS which can be used to overcome the problem of tradition file-based VMS systems and provide model versioning services. (author)

  10. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  11. Manager's assistant systems for space system planning

    Science.gov (United States)

    Bewley, William L.; Burnard, Robert; Edwards, Gary E.; Shoop, James

    1992-01-01

    This paper describes a class of knowledge-based 'assistant' systems for space system planning. Derived from technology produced for the DARPA/USAF Pilot's Associate program, these assistant systems help the human planner by doing the bookkeeping to maintain plan data and executing the procedures and heuristics currently used by the human planner to define, assess, diagnose, and revise plans. Intelligent systems for Space Station Freedom assembly sequence planning and Advanced Launch System modeling will be presented as examples. Ongoing NASA-funded work on a framework supporting the development of such tools will also be described.

  12. INTEGRATED HSEQ MANAGEMENT SYSTEMS: DEVELOPMENTS AND TRENDS

    Directory of Open Access Journals (Sweden)

    Osmo Kauppila

    2015-06-01

    Full Text Available The integration of health and safety, environmental and quality (HSEQ management systems has become a current topic in the 21st century, as the need for systems thinking has grown along with the number of management system standards. This study aims to map current developments and trends in integrated HSEQ management. Three viewpoints are taken: the current state of the main HSEQ management standards, research literature on integrated management systems (IMS, and a case study of an industry-led HSEQ cluster in Northern Finland. The results demonstrate that some of the most prominent current trends are the harmonization of the high level structure of management systems by ISO, the evaluation of IMS, accounting for the supply chain in HSEQ issues, and sustainability and risk management. The results of the study can be used by practitioners to get a view of the current state of HSEQ management systems and their integration, and by researchers to seek out potential directions for HSEQ and IMS related research.

  13. Environmental management systems and organizational change

    DEFF Research Database (Denmark)

    Jørgensen, Tine Herreborg

    2000-01-01

    and environmental management systems. The structure of the organizations has changed, the relationships with external partners have strengthened and the implementation of quality and environmental management systems has trimmed the organizations to manage and develop these areas. The organization analysis is based......The establishment of an environmental management system and its continuous improvements is a process towards a reduction of the companies' and the products' environmental impact. The organizations' ability to change is crucial in order to establish a dynamic environmental management system...... and to achieve continuous environmental improvements. The study of changes gives an insight into how organizations function, as well as their forces and barriers. This article focuses on the organizational changes that two companies have undergone from 1992 up until today in connection with their quality...

  14. Five paradox on energy system management

    International Nuclear Information System (INIS)

    Frisch, J.R.

    1995-01-01

    Five paradox are detailed on energy management: internationalization of energy questions but always regional management is present, short term problems must be solved but without forgetting long term problems in environment, the third paradox is : we have time but we are in a hurry, we have reserves but ten, twenty or thirty years are necessary to adapt our energy system; the fourth paradox is : we cannot manage energy by managing only energy, for example : finances system development and environment importance. The last and fifth paradox is : the market, yes, but state too, as regulative force

  15. 1995 Baseline solid waste management system description

    International Nuclear Information System (INIS)

    Anderson, G.S.; Konynenbelt, H.S.

    1995-09-01

    This provides a detailed solid waste system description that documents the treatment, storage, and disposal (TSD) strategy for managing Hanford's solid low-level waste, low-level mixed waste, transuranic and transuranic mixed waste, and greater-than-Class III waste. This system description is intended for use by managers of the solid waste program, facility and system planners, as well as system modelers. The system description identifies the TSD facilities that constitute the solid waste system and defines these facilities' interfaces, schedules, and capacities. It also provides the strategy for treating each of the waste streams generated or received by the Hanford Site from generation or receipt through final destination

  16. Integral consideration of integrated management systems

    International Nuclear Information System (INIS)

    Frauenknecht, Stefan; Schmitz, Hans

    2010-01-01

    Aim of the project for the NPPs Kruemmel and Brunsbuettel (Vattenfall) is the integral view of the business process as basis for the implementation and operation of management systems in the domains quality, safety and environment. The authors describe the integral view of the business processes in the frame of integrated management systems with the focus nuclear safety, lessons learned in the past, the concept of a process-based controlling system and experiences from the practical realization.

  17. Wheel speed management control system for spacecraft

    Science.gov (United States)

    Goodzeit, Neil E. (Inventor); Linder, David M. (Inventor)

    1991-01-01

    A spacecraft attitude control system uses at least four reaction wheels. In order to minimize reaction wheel speed and therefore power, a wheel speed management system is provided. The management system monitors the wheel speeds and generates a wheel speed error vector. The error vector is integrated, and the error vector and its integral are combined to form a correction vector. The correction vector is summed with the attitude control torque command signals for driving the reaction wheels.

  18. Improvements to information management systems simulator

    Science.gov (United States)

    Bilek, R. W.

    1972-01-01

    The performance of personnel in the augmentation and improvement of the interactive IMSIM information management simulation model is summarized. With this augmented model, NASA now has even greater capabilities for the simulation of computer system configurations, data processing loads imposed on these configurations, and executive software to control system operations. Through these simulations, NASA has an extremely cost effective capability for the design and analysis of computer-based data management systems.

  19. Waste Management System Requirements Document

    International Nuclear Information System (INIS)

    1992-02-01

    This DCP establishes an interim plan for the Office of Civilian Radioactive Waste Management (OCRWM) technical baseline until the results of the OCRWM Document Hierarchy Task Force can be implemented. This plan is needed to maintain continuity in the Program for ongoing work in the areas of Waste Acceptance, Transportation, Monitored Retrievable Storage (MRS) and Yucca Mountain Site Characterization

  20. QUALITY MANAGEMENT IN BANKING SYSTEM

    Directory of Open Access Journals (Sweden)

    Micuda Ion Dan

    2009-05-01

    Full Text Available Quality management banking perspective is extremely interesting, from the point of view of the activities specific, and of the permanent area competition improvement. Banks being aware of the quality problems also lead to the appearance and requirement of

  1. OCRWM Systems Engineering Management Plan (SEMP)

    International Nuclear Information System (INIS)

    1994-06-01

    The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies the close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M ampersand O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [''Program'' refers to the CRWMS-wide activity and ''project'' refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project

  2. Learning Management Systems: Are They Knowledge Management Tools?

    Directory of Open Access Journals (Sweden)

    Bayan Aref Abu Shawar

    2010-03-01

    Full Text Available The new adventure of online world has helped to improve many domains and sectors. Knowledge management era which originally related to business sector is now required in industry, health, or any institute that needs to manage its knowledge. Education is no exception! The advancement in computers speed and memory, and the growth of Internet usage are behind the inspiration of e-learning approach. In which the computer is used as a medium to deliver and share educational materials and knowledge instead of face-to-face tutoring. This makes education available to any one, any place, and any time as learner need. This paper presents the relationship between knowledge management and learning management system (LMS that is used in e-learning paradigms. A detailed description of the LMS used at Arab Open University (AOU is included in this paper. We claim that the LMS used at AOU can be considered as a knowledge management tool.

  3. A training module for quality management in calibration, maintenance and repair of nuclear instrumentation

    International Nuclear Information System (INIS)

    2008-01-01

    This learning module aims to provide practical guidelines for the organization of work and quality management practice in electronics laboratories in Member States. Nowadays, increased number of customers requires that the products are supplied with quality characteristics that satisfy their needs and expectations. The accelerated development of electronics and instrumentation during the last decades makes the electronics practice a field where competitiveness is ultimately defined by the confidence of the customers, based on their acceptance of the products and services provided. Quality management constitutes a practice encouraging the organizations to analyse customer requirements, to define the processes that contribute to the achievement of a product which is acceptable to the customer, and to keep these processes under control in order to improve the quality of the provided services and to increase customer satisfaction. The contents of this learning module are presented in three independent courses, designed for different level of interest: - Basic advice and recommendations: Practical advice for the organization of work, safety regulations and resource management. - Advanced quality management: Recommendations for the organization of a quality management system (QMS) compliant with ISO 9001 and ISO/IEC 17025 requirements and establishment of good practices. - Pursuing ISO 9001 and ISO/IEC 17025 accreditation: Recommendations for the organization of the QMS, templates of quality manual, operational procedures, records and forms. Customers' needs and expectations are changing, and due to competitive pressures and technological advances suppliers are forced to continually improve their products and services. Although the terms, definitions and concepts provided in this module are taken from the ISO 9000 standard series, the course does not constitute an ISO document as such. The recommendations and guidelines constitute an effort to help the understanding of

  4. Searching your site's management information systems

    International Nuclear Information System (INIS)

    Marquez, W.; Rollin, C.

    1994-01-01

    The Department of Energy's guidelines for the Baseline Environmental Management Report (BEMR) encourage the use of existing data when compiling information. Specific systems mentioned include the Progress Tracking System, the Mixed-Waste Inventory Report, the Waste Management Information System, DOE 4700.1-related systems, Programmatic Environmental Impact Statement (PEIS) data, and existing Work Breakdown Structures. In addition to these DOE-Headquarters tracking and reporting systems, there are a number of site systems that will be relied upon to produce the BEMR, including: (1) site management control and cost tracking systems; (2) commitment/issues tracking systems; (3) program-specific internal tracking systems; (4) Site material/equipment inventory systems. New requirements have often prompted the creation of new, customized tracking systems. This is a very time and money consuming process. As the BEMR Management Plan emphasizes, an effort should be made to use the information in existing tracking systems. Because of the wealth of information currently available from in-place systems, development of a new tracking system should be a last resort

  5. Y-12 Integrated Materials Management System

    Energy Technology Data Exchange (ETDEWEB)

    Alspaugh, D. H.; Hickerson, T. W.

    2002-06-03

    The Integrated Materials Management System, when fully implemented, will provide the Y-12 National Security Complex with advanced inventory information and analysis capabilities and enable effective assessment, forecasting and management of nuclear materials, critical non-nuclear materials, and certified supplies. These capabilities will facilitate future Y-12 stockpile management work, enhance interfaces to existing National Nuclear Security Administration (NNSA) corporate-level information systems, and enable interfaces to planned NNSA systems. In the current national nuclear defense environment where, for example, weapons testing is not permitted, material managers need better, faster, more complete information about material properties and characteristics. They now must manage non-special nuclear material at the same high-level they have managed SNM, and information capabilities about both must be improved. The full automation and integration of business activities related to nuclear and non-nuclear materials that will be put into effect by the Integrated Materials Management System (IMMS) will significantly improve and streamline the process of providing vital information to Y-12 and NNSA managers. This overview looks at the kinds of information improvements targeted by the IMMS project, related issues, the proposed information architecture, and the progress to date in implementing the system.

  6. Y-12 Integrated Materials Management System

    International Nuclear Information System (INIS)

    Alspaugh, D. H.; Hickerson, T. W.

    2002-01-01

    The Integrated Materials Management System, when fully implemented, will provide the Y-12 National Security Complex with advanced inventory information and analysis capabilities and enable effective assessment, forecasting and management of nuclear materials, critical non-nuclear materials, and certified supplies. These capabilities will facilitate future Y-12 stockpile management work, enhance interfaces to existing National Nuclear Security Administration (NNSA) corporate-level information systems, and enable interfaces to planned NNSA systems. In the current national nuclear defense environment where, for example, weapons testing is not permitted, material managers need better, faster, more complete information about material properties and characteristics. They now must manage non-special nuclear material at the same high-level they have managed SNM, and information capabilities about both must be improved. The full automation and integration of business activities related to nuclear and non-nuclear materials that will be put into effect by the Integrated Materials Management System (IMMS) will significantly improve and streamline the process of providing vital information to Y-12 and NNSA managers. This overview looks at the kinds of information improvements targeted by the IMMS project, related issues, the proposed information architecture, and the progress to date in implementing the system

  7. Globalization and localization of Management Control Systems

    DEFF Research Database (Denmark)

    Toldbod, Thomas; Israelsen, Poul

    2014-01-01

    Through an empirical case study this article examines the operation of multiple management control systems as a package in a Danish manufacturing company. The analysis focuses on four different management control systems; cybernetic controls, planning controls, reward controls, and administrative...... have more particular characteristics. Specifically, this study finds that cybernetic controls and administrative controls are designed as global management control systems. Planning controls are glocal systems and reward & compensation controls assume local characteristics. The finding leads...... controls, through the theoretical lens of globalization, localization, and glocalization. The analysis documents that these different management control systems are affected differently by the processes of globalization and localization, whereby some are universal throughout the organization and others...

  8. Development of a change management system

    Science.gov (United States)

    Parks, Cathy Bonifas

    1993-01-01

    The complexity and interdependence of software on a computer system can create a situation where a solution to one problem causes failures in dependent software. In the computer industry, software problems arise and are often solved with 'quick and dirty' solutions. But in implementing these solutions, documentation about the solution or user notification of changes is often overlooked, and new problems are frequently introduced because of insufficient review or testing. These problems increase when numerous heterogeneous systems are involved. Because of this situation, a change management system plays an integral part in the maintenance of any multisystem computing environment. At the NASA Ames Advanced Computational Facility (ACF), the Online Change Management System (OCMS) was designed and developed to manage the changes being applied to its multivendor computing environment. This paper documents the research, design, and modifications that went into the development of this change management system (CMS).

  9. Thermal management of EV battery systems

    Energy Technology Data Exchange (ETDEWEB)

    Birch, P.K.

    1984-01-01

    The thermal limitations of the actual design and the benefits of more extensive thermal management of electric vehicle systems are described. During this work a number of practical limitations in vehicle design, which has to be frozen relatively early in the project, made it impossible to take advantage of the benefits of thermal management in connection with the design of the modular battery system. This study, therfore, deals only very briefly with the actual project. The aim has been to show the possibilities of improvement based on traditional electrochemical systems (e.g., all lead-acid) by means of thermal management.

  10. Effective maintenance practices to manage system aging

    International Nuclear Information System (INIS)

    Chockie, A.; Bjorkelo, K.

    1992-01-01

    For a variety of economic and technical reasons, there has been a growing concern with the aging of complex systems and components and the role that maintenance can play in reducing this degradation. A study for the Nuclear Regulatory Commission was recently undertaken to identify effective maintenance practices that could be adapted by the nuclear industry in the United States to assist in managing the aging degradation of plant systems and components. Four organizations were examined to assess the influence that their maintenance programs have on their ability to address the systems and component aging degradation issues. An effective maintenance program was found to be essential to the management of system and component aging. The four key elements of an effective maintenance program that are important to an aging management program were identified. These are: the selection of critical systems and components; the development of an understanding of aging through the collection and analysis of equipment performance information; the development of appropriate preventive and predictive maintenance tasks to manage equipment and system aging degradation; the use of feedback mechanisms to continuously improve the management of aging systems and components. These elements were found to be common to all four organizations. In examining how the four organizations have structured their maintenance programs to include these key elements provides valuable lessons not only for the nuclear power industry, but also for any industrial organization that is concerned with the management of system and component aging degradation. This document provides detail, of these studies

  11. Microsoft System Center Configuration Manager

    CERN Document Server

    Sandbu, Marius

    2013-01-01

    This book is a step-by-step tutorial that guides you through the key steps in implementing best solutions for high availability and performance tuning. It is split into two distinct approaches: client and site side HA and optimization.Microsoft SCCM High Availability and Performance Tuning is for IT professionals and consultants working with Configuration Manager who wish to learn the skills to deploy a redundant and scalable solution.

  12. Management issues for high performance storage systems

    Energy Technology Data Exchange (ETDEWEB)

    Louis, S. [Lawrence Livermore National Lab., CA (United States); Burris, R. [Oak Ridge National Lab., TN (United States)

    1995-03-01

    Managing distributed high-performance storage systems is complex and, although sharing common ground with traditional network and systems management, presents unique storage-related issues. Integration technologies and frameworks exist to help manage distributed network and system environments. Industry-driven consortia provide open forums where vendors and users cooperate to leverage solutions. But these new approaches to open management fall short addressing the needs of scalable, distributed storage. We discuss the motivation and requirements for storage system management (SSM) capabilities and describe how SSM manages distributed servers and storage resource objects in the High Performance Storage System (HPSS), a new storage facility for data-intensive applications and large-scale computing. Modem storage systems, such as HPSS, require many SSM capabilities, including server and resource configuration control, performance monitoring, quality of service, flexible policies, file migration, file repacking, accounting, and quotas. We present results of initial HPSS SSM development including design decisions and implementation trade-offs. We conclude with plans for follow-on work and provide storage-related recommendations for vendors and standards groups seeking enterprise-wide management solutions.

  13. Profitability of Management Systems on German Fenlands

    Directory of Open Access Journals (Sweden)

    Marco Rebhann

    2016-10-01

    Full Text Available Fens are organic sites that require drainage for agricultural use. Lowering the groundwater level leads to trade-offs between economic benefits and environmental impacts (i.e., CO2 and nutrient emissions. To identify management options that are both environmentally and economically sustainable, a propaedeutic systematic analysis of the costs, income and profit of different land use and management systems on fenlands is necessary. This study provides an overview of the profitability, labor demand and comparative advantages of feasible management systems on German fenlands. Twenty management practices in four land use systems are analyzed. The results indicate that most management systems are profitable only with subsidies and payments for ecosystem services. In addition to sales revenue, these payments are indispensable to promote peat-saving agricultural practices on fenlands. Regarding the labor aspect, intensive management systems caused an increase in working hours per hectare, which may positively affect employment in rural areas. The calculations obtained in this study can be used as a basis for estimations of greenhouse gas (GHG mitigation costs when management systems are associated with GHG emission values.

  14. Temperature dependence of liquid lithium film formation and deuterium retention on hot W samples studied by LID-QMS. Implications for future fusion reactors

    Science.gov (United States)

    de Castro, A.; Sepetys, A.; González, M.; Tabarés, F. L.

    2018-04-01

    Liquid metal (LM) divertor concepts explore an alternative solution to the challenging power/particle exhaust issues in future magnetic fusion reactors. Among them, lithium (Li) is the most promising material. Its use has shown important advantages in terms of improved H-mode plasma confinement and heat handling capabilities. In such scenario, a possible combination of tungsten (W) on the first wall and liquid Li on the divertor could be an acceptable solution, but several issues related to material compatibility remain open. In particular, the co-deposition of Li and hydrogen isotopes on W components could increase the associated tritium retention and represent a safety risk, especially if these co-deposits can uncontrollably grow in remote/plasma shadowed zones of the first wall. In this work, the retention of Li and deuterium (D) on tungsten at different surface temperature (200 °C-400 °C) has been studied by exposing W samples to Li evaporation under several D2 gaseous environments. Deuterium retention in the W-Li films has been quantified by using laser induced desorption-mass spectrometry (LID-QMS). Additional techniques as thermal desorption spectroscopy, secondary ion mass spectrometry, profilemetry and flame atomic emission spectroscopy were implemented to corroborate the retention results and for the qualitative and quantitative characterization of the films. The results showed a negligible (below LID sensibility) D uptake at T surface  =  225 °C, when the W-Li layer is exposed to simultaneous Li evaporation and D2 gas exposition (0.67 Pa). Pre-lithiated samples were also exposed to higher D2 pressures (133.3 Pa) at different temperatures (200 °C-400 °C). A non-linear drastic reduction in the D retention with increasing temperatures was found on the W-Li films, presenting a D/Li atomic ratio at 400 °C lower than 0.1 at.% on a thin film of  ≈100 nm thick. These results bode well (in terms of tritium inventory) for the potential

  15. Research and Development Management System (RDMS)

    International Nuclear Information System (INIS)

    Mohd Azidi Abdul Rahman; Abdul Muin Abdul Rahman; Sufian Norazam Mohamed Aris; Saaidi Ismail; Mohamad Safuan Sulaiman; Maizura Ibrahim; Hazizi Omar; Roslan Mohd Ali

    2010-01-01

    Research and Development (R and D) is a main activity carried out at the Malaysian Nuclear Agency particularly in the physical science and nuclear field. The R and D activity that is carried out needs to be managed more efficiently and systematically. Until now all research management activities are carried out manually or semi electronically, beginning from filling in application forms to when the project is completed. Therefore a computerized system is needed in order to manage and monitor R and D projects. The R and D system is capable of giving access information concerning R and D projects which are carried out to users inside and outside the agency. The R and D management system (RDMS) can increase the capability of the Malaysian Nuclear Agency in managing, researching and developing, innovating and inventing technology as well as commercializing the R and D produced. (author)

  16. Neural neworks in a management information systems

    Directory of Open Access Journals (Sweden)

    Jana Weinlichová

    2009-01-01

    Full Text Available For having retrospection for all over the data which are used, analyzed, evaluated and for a future incident predictions are used Management Information Systems and Business Intelligence. In case of not to be able to apply standard methods of data processing there can be with benefit applied an Artificial Intelligence. In this article will be referred to proofed abilities of Neural Networks. The Neural Networks is supported by many software products related to provide effective solution of manager issues. Those products are given as primary support for manager issues solving. We were tried to find reciprocally between products using Neural Networks and between Management Information Systems for finding a real possibility of applying Neural Networks as a direct part of Management Information Systems (MIS. In the article are presented possibilities to apply Neural Networks on different types of tasks in MIS.

  17. Dialogue Systems and Dialogue Management

    Science.gov (United States)

    2016-12-01

    users) UNCLASSIFIED DST-Group-TR-3331 UNCLASSIFIED 1 1. Introduction The motivation behind an investigation into spoken dialogue systems lies with...characteristics can form the basis of a user model or motivate the use of an alternative dialogue strategy to cater for users based on what the system ...2007) in their use of POMDPs implicitly capture what system actions are desired by associating them with large positive rewards , and negative

  18. Visualization System for Monitoring Data Management Systems

    Directory of Open Access Journals (Sweden)

    Emanuel Pinho

    2016-11-01

    Full Text Available Usually, a Big Data system has a monitoring system for performance evaluation and error prevention. There are some disadvantages in the way that these tools display the information and its targeted approach to physical components. The main goal is to study visual and interactive mechanisms that allow the representation of monitoring data in grid computing environments, providing the end-user information, which can contribute objectively to the system analysis. This paper is an extension of the paper presented at (Pinho and Carvalho 2016 and has the purpose to present the state of the art, carries out the proposed solution and present the achieved goals.

  19. 76 FR 76917 - Homeless Management Information Systems Requirements

    Science.gov (United States)

    2011-12-09

    ...-P-01] Homeless Management Information Systems Requirements AGENCY: Office of the Assistant Secretary... for the establishment of regulations for Homeless Management Information Systems (HMIS), which are the... community development, Homeless, Information technology system, Management system, Nonprofit organizations...

  20. Managing Health Information System | Campbell | Nigerian ...

    African Journals Online (AJOL)

    The effective planning, management monitoring and evaluation of health services, health resources and indeed the health system requires a wealth of health information, with its simultaneous effective and efficient management. It is an instrument used to help policy-making, decision making and day to day actions in the ...