WorldWideScience

Sample records for management requirements volume

  1. Functional Requirements for Onboard Management of Space Shuttle Consumables. Volume 2

    Science.gov (United States)

    Graf, P. J.; Herwig, H. A.; Neel, L. W.

    1973-01-01

    This report documents the results of the study "Functional Requirements for Onboard Management of Space Shuttle Consumables." The study was conducted for the Mission Planning and Analysis Division of the NASA Lyndon B. Johnson Space Center, Houston, Texas, between 3 July 1972 and 16 November 1973. The overall study program objective was two-fold. The first objective was to define a generalized consumable management concept which is applicable to advanced spacecraft. The second objective was to develop a specific consumables management concept for the Space Shuttle vehicle and to generate the functional requirements for the onboard portion of that concept. Consumables management is the process of controlling or influencing the usage of expendable materials involved in vehicle subsystem operation. The report consists of two volumes. Volume I presents a description of the study activities related to general approaches for developing consumable management, concepts for advanced spacecraft applications, and functional requirements for a Shuttle consumables management concept. Volume II presents a detailed description of the onboard consumables management concept proposed for use on the Space Shuttle.

  2. Detailed requirements document for the Interactive Financial Management System (IFMS), volume 1

    Science.gov (United States)

    Dodson, D. B.

    1975-01-01

    The detailed requirements for phase 1 (online fund control, subauthorization accounting, and accounts receivable functional capabilities) of the Interactive Financial Management System (IFMS) are described. This includes information on the following: systems requirements, performance requirements, test requirements, and production implementation. Most of the work is centered on systems requirements, and includes discussions on the following processes: resources authority, allotment, primary work authorization, reimbursable order acceptance, purchase request, obligation, cost accrual, cost distribution, disbursement, subauthorization performance, travel, accounts receivable, payroll, property, edit table maintenance, end-of-year, backup input. Other subjects covered include: external systems interfaces, general inquiries, general report requirements, communication requirements, and miscellaneous. Subjects covered under performance requirements include: response time, processing volumes, system reliability, and accuracy. Under test requirements come test data sources, general test approach, and acceptance criteria. Under production implementation come data base establishment, operational stages, and operational requirements.

  3. Functional requirements for onboard management of space shuttle consumables, volume 1

    Science.gov (United States)

    Graf, P. J.; Herwig, H. A.; Neel, L. W.

    1973-01-01

    A study was conducted to determine the functional requirements for onboard management of space shuttle consumables. A generalized consumable management concept was developed for application to advanced spacecraft. The subsystems and related consumables selected for inclusion in the consumables management system are: (1) propulsion, (2) power generation, and (3) environmental and life support.

  4. Waste Management System Requirement document

    International Nuclear Information System (INIS)

    1990-04-01

    This volume defines the top level technical requirements for the Monitored Retrievable Storage (MRS) facility. It is designed to be used in conjunction with Volume 1, General System Requirements. Volume 3 provides a functional description expanding the requirements allocated to the MRS facility in Volume 1 and, when appropriate, elaborates on requirements by providing associated performance criteria. Volumes 1 and 3 together convey a minimum set of requirements that must be satisfied by the final MRS facility design without unduly constraining individual design efforts. The requirements are derived from the Nuclear Waste Policy Act of 1982 (NWPA), the Nuclear Waste Policy Amendments Act of 1987 (NWPAA), the Environmental Protection Agency's (EPA) Environmental Standards for the Management and Disposal of Spent Nuclear Fuel (40 CFR 191), NRC Licensing Requirements for the Independent Storage of Spent Nuclear and High-Level Radioactive Waste (10 CFR 72), and other federal statutory and regulatory requirements, and major program policy decisions. This document sets forth specific requirements that will be fulfilled. Each subsequent level of the technical document hierarchy will be significantly more detailed and provide further guidance and definition as to how each of these requirements will be implemented in the design. Requirements appearing in Volume 3 are traceable into the MRS Design Requirements Document. Section 2 of this volume provides a functional breakdown for the MRS facility. 1 tab

  5. Solar Heating And Cooling Of Buildings (SHACOB): Requirements definition and impact analysis-2. Volume 3: Customer load management systems

    Science.gov (United States)

    Cretcher, C. K.; Rountredd, R. C.

    1980-11-01

    Customer Load Management Systems, using off-peak storage and control at the residences, are analyzed to determine their potential for capacity and energy savings by the electric utility. Areas broadly representative of utilities in the regions around Washington, DC and Albuquerque, NM were of interest. Near optimum tank volumes were determined for both service areas, and charging duration/off-time were identified as having the greatest influence on tank performance. The impacts on utility operations and corresponding utility/customer economics were determined in terms of delta demands used to estimate the utilities' generating capacity differences between the conventional load management, (CLM) direct solar with load management (DSLM), and electric resistive systems. Energy differences are also determined. These capacity and energy deltas are translated into changes in utility costs due to penetration of the CLM or DSLM systems into electric resistive markets in the snapshot years of 1990 and 2000.

  6. Environmental Requirements Management

    Energy Technology Data Exchange (ETDEWEB)

    Cusack, Laura J.; Bramson, Jeffrey E.; Archuleta, Jose A.; Frey, Jeffrey A.

    2015-01-08

    CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organization’s ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: • Communicating requirements • Planning work • Maintaining work controls • Maintaining compliance

  7. LEGACY MANAGEMENT REQUIRES INFORMATION

    International Nuclear Information System (INIS)

    CONNELL, C.W.; HILDEBRAND, R.D.

    2006-01-01

    ''Legacy Management Requires Information'' describes the goal(s) of the US Department of Energy's Office of Legacy Management (LM) relative to maintaining critical records and the way those goals are being addressed at Hanford. The paper discusses the current practices for document control, as well as the use of modern databases for both storing and accessing the data to support cleanup decisions. In addition to the information goals of LM, the Hanford Federal Facility Agreement and Consent Order, known as the ''Tri-Party Agreement'' (TPA) is one of the main drivers in documentation and data management. The TPA, which specifies discrete milestones for cleaning up the Hanford Site, is a legally binding agreement among the US Department of Energy (DOE), the Washington State Department of Ecology (Ecology), and the US Environmental Protection Agency (EPA). The TPA requires that DOE provide the lead regulatory agency with the results of analytical laboratory and non-laboratory tests/readings to help guide them in making decisions. The Agreement also calls for each signatory to preserve--for at least ten years after the Agreement has ended--all of the records in its or its contractors, possession related to sampling, analysis, investigations, and monitoring conducted. The tools used at Hanford to meet TPA requirements are also the tools that can satisfy the needs of LM

  8. State policies and requirements for management of uranium mining and milling in New Mexico. Volume V. State policy needs for community impact assistance

    International Nuclear Information System (INIS)

    Vandevender, S.G.

    1980-04-01

    The report contained in this volume describes a program for management of the community impacts resulting from the growth of uranium mining and milling in New Mexico. The report, submitted to Sandia Laboratories by the New Mexico Department of Energy and Minerals, is reproduced without modification. The state recommends that federal funding and assistance be provided to implement a growth management program comprised of these seven components: (1) an early warning system, (2) a community planning and technical assistance capability, (3) flexible financing, (4) a growth monitoring system, (5) manpower training, (6) economic diversification planning, and (7) new technology testing

  9. Hanford analytical services quality assurance requirements documents. Volume 1: Administrative Requirements

    International Nuclear Information System (INIS)

    Hyatt, J.E.

    1997-01-01

    Hanford Analytical Services Quality Assurance Requirements Document (HASQARD) is issued by the Analytical Services, Program of the Waste Management Division, US Department of Energy (US DOE), Richland Operations Office (DOE-RL). The HASQARD establishes quality requirements in response to DOE Order 5700.6C (DOE 1991b). The HASQARD is designed to meet the needs of DOE-RL for maintaining a consistent level of quality for sampling and field and laboratory analytical services provided by contractor and commercial field and laboratory analytical operations. The HASQARD serves as the quality basis for all sampling and field/laboratory analytical services provided to DOE-RL through the Analytical Services Program of the Waste Management Division in support of Hanford Site environmental cleanup efforts. This includes work performed by contractor and commercial laboratories and covers radiological and nonradiological analyses. The HASQARD applies to field sampling, field analysis, and research and development activities that support work conducted under the Hanford Federal Facility Agreement and Consent Order Tri-Party Agreement and regulatory permit applications and applicable permit requirements described in subsections of this volume. The HASQARD applies to work done to support process chemistry analysis (e.g., ongoing site waste treatment and characterization operations) and research and development projects related to Hanford Site environmental cleanup activities. This ensures a uniform quality umbrella to analytical site activities predicated on the concepts contained in the HASQARD. Using HASQARD will ensure data of known quality and technical defensibility of the methods used to obtain that data. The HASQARD is made up of four volumes: Volume 1, Administrative Requirements; Volume 2, Sampling Technical Requirements; Volume 3, Field Analytical Technical Requirements; and Volume 4, Laboratory Technical Requirements. Volume 1 describes the administrative requirements

  10. Waste management system requirements document

    International Nuclear Information System (INIS)

    1991-02-01

    This volume defines the top level requirements for the Mined Geologic Disposal System (MGDS). It is designed to be used in conjunction with Volume 1 of the WMSR, General System Requirements. It provides a functional description expanding the requirements allocated to the MGDS in Volume 1 and elaborates on each requirement by providing associated performance criteria as appropriate. Volumes 1 and 4 of the WMSR provide a minimum set of requirements that must be satisfied by the final MGDS design. This document sets forth specific requirements that must be fulfilled. It is not the intent or purpose of this top level document to describe how each requirement is to be satisfied in the final MGDS design. Each subsequent level of the technical document hierarchy must provide further guidance and definition as to how each of these requirements is to be implemented in the design. It is expected that each subsequent level of requirements will be significantly more detailed. Section 2 of this volume provides a functional description of the MGDS. Each function is addressed in terms of requirements, and performance criteria. Section 3 provides a list of controlling documents. Each document cited in a requirement of Chapter 2 is included in this list and is incorporated into this document as a requirement on the final system. The WMSR addresses only federal requirements (i.e., laws, regulations and DOE orders). State and local requirements are not addressed. However, it will be specifically noted at the potentially affected WMSR requirements that there could be additional or more stringent regulations imposed by a state or local requirements or administering agency over the cited federal requirements

  11. Requirements in Functional IT Management

    NARCIS (Netherlands)

    Blaauboer, F.A.; Blaauboer, F.A.

    Requirements engineering and functional IT management have never been researched as to containing similar activities. This paper describes and compares both disciplines, where the BiSL-framework is used for functional IT management. The similarities and differences between the two disciplines are

  12. Requirements management: A CSR's perspective

    Science.gov (United States)

    Thompson, Joanie

    1991-01-01

    The following subject areas are covered: customer service overview of network service request processing; Customer Service Representative (CSR) responsibility matrix; extract from a sample Memorandum of Understanding; Network Service Request Form and its instructions sample notification of receipt; and requirements management in the NASA Science Internet.

  13. Sandia software guidelines, Volume 4: Configuration management

    Energy Technology Data Exchange (ETDEWEB)

    1992-06-01

    This volume is one in a series of Sandia Software Guidelines for use in producing quality software within Sandia National Laboratories. This volume is based on the IEEE standard and guide for software configuration management. The basic concepts and detailed guidance on implementation of these concepts are discussed for several software project types. Example planning documents for both projects and organizations are included.

  14. Technology Requirements for Information Management

    Science.gov (United States)

    Graves, Sara; Knoblock, Craig A.; Lannom, Larry

    2002-01-01

    This report provides the results of a panel study conducted into the technology requirements for information management in support of application domains of particular government interest, including digital libraries, mission operations, and scientific research. The panel concluded that it was desirable to have a coordinated program of R&D that pursues a science of information management focused on an environment typified by applications of government interest - highly distributed with very large amounts of data and a high degree of heterogeneity of sources, data, and users.

  15. Advances in Serials Management. Volume 6.

    Science.gov (United States)

    Hepfer, Cindy, Ed.; Gammon, Julia, Ed.; Malinowski, Teresa, Ed.

    In order to further discussion and support constructive change, this volume presents the following eight papers on various dimensions of serials management: (1) "CD-ROMs, Surveys, and Sales: The OSA [Optical Society of America] Experience" (Frank E. Harris and Alan Tourtlotte); (2) "Management and Integration of Electronic Journals into the…

  16. Subsurface Contamination Focus Area technical requirements. Volume 1: Requirements summary

    International Nuclear Information System (INIS)

    Nickelson, D.; Nonte, J.; Richardson, J.

    1996-10-01

    This document summarizes functions and requirements for remediation of source term and plume sites identified by the Subsurface Contamination Focus Area. Included are detailed requirements and supporting information for source term and plume containment, stabilization, retrieval, and selective retrieval remedial activities. This information will be useful both to the decision-makers within the Subsurface Contamination Focus Area (SCFA) and to the technology providers who are developing and demonstrating technologies and systems. Requirements are often expressed as graphs or charts, which reflect the site-specific nature of the functions that must be performed. Many of the tradeoff studies associated with cost savings are identified in the text

  17. Ageing management requirements in Sweden

    International Nuclear Information System (INIS)

    Gott, K.

    2007-01-01

    Since the adoption of the 1997 act of parliament concerning the abolishment of nuclear power in Sweden plant lives are no longer limited until 2010 as they were following the referendum in 1980. The Swedish Nuclear Power Inspectorate (SKI) has therefore in its most recent general regulations from 2004 introduced requirements for plants to develop ageing management programmes which should have been in place by the end of 2005. An ageing management programme for a nuclear power plant can be viewed as a high level coordinated programme consisting of several other programmes including maintenance and inspection programmes, and as such it should be an integrated part of the quality assurance system of the plant. The goals of the programme are to ensure that there is long term management of ageing and avoidance of the unexpected. For the Swedish regulator the safety aspects and not the economic aspects of ageing management are of primary importance. But there are clear advantages to utilities if large surprises which result in unplanned outages can be avoided. (author)

  18. State policies and requirements for management of uranium mining and milling in New Mexico. Volume II. Water availability in the San Juan Structural Basin

    International Nuclear Information System (INIS)

    Vandevender, S.G.

    1980-04-01

    This volume contains Two parts: Part One is an analysis of an issue paper prepared by the office of the New Mexico State Engineer on water availability for uranium production. Part Two is the issue paper itself. The State Engineer's report raises the issue of a scarce water supply in the San Juan Structural Basin acting as a constraint on the growth of the uranium mining and milling industry in New Mexico. The water issue in the structural basin is becoming an acute policy issue because of the uranium industry's importance to and rapid growth within the structural basin. Its growth places heavy demands on the region's scarce water supply. The impact of mine dewatering on water supply is of particular concern. Much of the groundwater has been appropriated or applied for. The State Engineer is currently basing water rights decisions upon data which he believes to be inadequate to determine water quality and availability in the basin. He, along with the USGS and the State Bureau of Mines and Mineral Resources, recommends a well drilling program to acquire the additional information about the groundwater characteristics of the basin. The information would be used to provide input data for a computer model, which is used as one of the bases for decisions concerning water rights and water use in the basin. The recommendation is that the appropriate DOE office enter into discussions with the New Mexico State Engineer to explore the potential mutual benefits of a well drilling program to determine the water availability in the San Juan Structural Basin

  19. MARS code manual volume II: input requirements

    International Nuclear Information System (INIS)

    Chung, Bub Dong; Kim, Kyung Doo; Bae, Sung Won; Jeong, Jae Jun; Lee, Seung Wook; Hwang, Moon Kyu

    2010-02-01

    Korea Advanced Energy Research Institute (KAERI) conceived and started the development of MARS code with the main objective of producing a state-of-the-art realistic thermal hydraulic systems analysis code with multi-dimensional analysis capability. MARS achieves this objective by very tightly integrating the one dimensional RELAP5/MOD3 with the multi-dimensional COBRA-TF codes. The method of integration of the two codes is based on the dynamic link library techniques, and the system pressure equation matrices of both codes are implicitly integrated and solved simultaneously. In addition, the Equation-Of-State (EOS) for the light water was unified by replacing the EOS of COBRA-TF by that of the RELAP5. This input manual provides a complete list of input required to run MARS. The manual is divided largely into two parts, namely, the one-dimensional part and the multi-dimensional part. The inputs for auxiliary parts such as minor edit requests and graph formatting inputs are shared by the two parts and as such mixed input is possible. The overall structure of the input is modeled on the structure of the RELAP5 and as such the layout of the manual is very similar to that of the RELAP. This similitude to RELAP5 input is intentional as this input scheme will allow minimum modification between the inputs of RELAP5 and MARS3.1. MARS3.1 development team would like to express its appreciation to the RELAP5 Development Team and the USNRC for making this manual possible

  20. Quality assurance management policies and requirements

    International Nuclear Information System (INIS)

    1985-10-01

    The purpose of this document is to: set forth overall, integrated quality assurance management policies and requirements for the entire Civilian Radioactive Waste Management Program; define management responsibilities for assuring quality; and provide a general framework for the development of more detailed quality assurance management policies and requirements by program, project, and contractor organizations

  1. AFSC Laboratory Management Information Requirements Project

    National Research Council Canada - National Science Library

    1982-01-01

    This document was developed under the auspices of the Laboratory IRM (LIRM) Management Working Group in response to AFSC Program Directive 0008-81-1, Management Information Requirement Project (23 February 1981...

  2. High level waste storage tank farms/242-A evaporator Standards/Requirements Identification Document (S/RID), Volume 6

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    The High-Level Waste Storage Tank Farms/242-A Evaporator Standards/Requirements Identification Document (S/RID) is contained in multiple volumes. This document (Volume 6) outlines the standards and requirements for the sections on: Environmental Restoration and Waste Management, Research and Development and Experimental Activities, and Nuclear Safety.

  3. High level waste storage tank farms/242-A evaporator Standards/Requirements Identification Document (S/RID), Volume 6

    International Nuclear Information System (INIS)

    1994-04-01

    The High-Level Waste Storage Tank Farms/242-A Evaporator Standards/Requirements Identification Document (S/RID) is contained in multiple volumes. This document (Volume 6) outlines the standards and requirements for the sections on: Environmental Restoration and Waste Management, Research and Development and Experimental Activities, and Nuclear Safety

  4. Management system requirements for small reactors

    Energy Technology Data Exchange (ETDEWEB)

    Jones, K.A., E-mail: kenneth.jones@cnsc-ccsn.gc.ca [Canadian Nuclear Safety Commission, Ottawa, Ontario (Canada)

    2013-07-01

    This abstract identifies the management system requirements for the life cycle of small reactors from initial conception through completion of decommissioning. For small reactors, the requirements for management systems remain the same as those for 'large' reactors regardless of the licensee' business model and objectives. The CSA N-Series of standards provides an interlinked set of requirements for the management of nuclear facilities. CSA N286 provides overall direction to management to develop and implement sound management practices and controls, while other CSA nuclear standards provide technical requirements and guidance that support the management system. CSA N286 is based on a set of principles. The principles are then supported by generic requirements that are applicable to the life cycle of nuclear facilities. CNSC regulatory documents provide further technical requirements and guidance. (author)

  5. Waste Management System Requirements Document

    International Nuclear Information System (INIS)

    1992-02-01

    This DCP establishes an interim plan for the Office of Civilian Radioactive Waste Management (OCRWM) technical baseline until the results of the OCRWM Document Hierarchy Task Force can be implemented. This plan is needed to maintain continuity in the Program for ongoing work in the areas of Waste Acceptance, Transportation, Monitored Retrievable Storage (MRS) and Yucca Mountain Site Characterization

  6. I-15 integrated corridor management : system requirements.

    Science.gov (United States)

    2011-07-01

    This document is intended as a listing and discussion of the Requirements for the I-15 Integrated Corridor Management System : (ICMS) Demonstration Project in San Diego. This document describes what the system is to do (the functional requirements), ...

  7. Requirements management at Westinghouse Electric Company

    International Nuclear Information System (INIS)

    Gustavsson, Henrik

    2014-01-01

    Field studies and surveys made in various industry branches support the Westinghouse opinion that qualitative systems engineering and requirements management have a high value in the development of complex systems and products. Two key issues causing overspending and schedule delays in projects are underestimation of complexity and misunderstandings between the different sub-project teams. These issues often arise when a project jumps too early into detail design. Good requirements management practice before detail design helps the project teams avoid such issues. Westinghouse therefore puts great effort into requirements management. The requirements management methodology at Westinghouse rests primarily on four key cornerstones: 1 - Iterative team work when developing requirements specifications, 2 - Id number tags on requirements, 3 - Robust change routine, and 4 - Requirements Traceability Matrix. (authors)

  8. Advanced light water reactor utility requirements document: Volume 1--ALWR policy and summary of top-tier requirements

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    The U.S. utilities are leading an industry wide effort to establish the technical foundation for the design of the Advanced Light Water Reactor (ALWR). This effort, the ALWR Program, is being managed for the U.S. electric utility industry by the Electric Power Research Institute (EPRI) and includes participation and sponsorship of several international utility companies and close cooperation with the U.S. Department of Energy (DOE). The cornerstone of the ALWR Program is a set of utility design requirements which are contained in the ALWR Requirements Document. The purpose of the Requirement Document is to present a clear, complete statement of utility desires for their next generation of nuclear plants. The Requirements Document covers the entire plant up to the grid interface. It therefore is the basis for an integrated plant design, i.e., nuclear steam supply system and balance of plant, and it emphasizes those areas which are most important to the objective of achieving an ALWR which is excellent with respect to safety, performance, constructibility, and economics. The document applies to both Pressurized Water Reactors (PWRs) and Boiling Water Reactors (BWRs). The Requirements Document is organized in three volumes. Volume 1 summarizes AlWR Program policy statements and top-tier requirements. The top-tier design requirements are categorized by major functions, including safety and investment protection, performance, and design process and constructibility. There is also a set of general design requirements, such as simplification and proven technology, which apply broadly to the ALWR design, and a set of economic goals for the ALWR program. The top-tier design requirements are described further in Volume 1 and are formally invoked as requirements in Volumes 2 and 3

  9. Training Requirements and Information Management System

    Energy Technology Data Exchange (ETDEWEB)

    Cillan, T.F.; Hodgson, M.A.

    1992-05-01

    This is the software user's guide for the Training Requirements and Information Management System. This guide defines and describes the software operating procedures as they apply to the end user of the software program. This guide is intended as a reference tool for the user who already has an indepth knowledge of the Training Requirements and Information Management System functions and data reporting requirement.

  10. From document to database: modernizing requirements management

    International Nuclear Information System (INIS)

    Giajnorio, J.; Hamilton, S.

    2007-01-01

    The creation, communication, and management of design requirements are central to the successful completion of any large engineering project, both technically and commercially. Design requirements in the Canadian nuclear industry are typically numbered lists in multiple documents created using word processing software. As an alternative, GE Nuclear Products implemented a central requirements management database for a major project at Bruce Power. The database configured the off-the-shelf software product, Telelogic Doors, to GE's requirements structure. This paper describes the advantages realized by this scheme. Examples include traceability from customer requirements through to test procedures, concurrent engineering, and automated change history. (author)

  11. Seaway Information System Management and Control Requirements

    Science.gov (United States)

    1973-10-01

    This report examines in detail the control and information system requirements of the St. Lawrence Seaway development program in terms of the needs of the vessel traffic controllers and the management users. Structural control models of Seaway operat...

  12. European utility requirements (EUR) volume 3 assessment for AP1000

    International Nuclear Information System (INIS)

    Saiu, G.; Demetri, K.J.

    2005-01-01

    The EUR (European Utility Requirements) Volume 3 is intended to report the Plant Description, the Compliance Assessment to EUR Volumes 1 and 2, and finally, the Specific Requirements for each specific Nuclear Power Plant Design considered by the EUR. Five subsets of EUR Volume 3, based on EUR Revision B, are already published; all of which are next generation plant designs being developed for Europe beyond 2000. They include : 1) EP1000 - Passive Pressurized Light Water Reactor (3-Loop, 1000 MWe) 2) EPR - Evolutionary Pressurized Light Water Reactor (1500 MWe) 3) BWR90/90+ - Evolutionary Boiling Water Reactor (1400 MWe) 4) ABWR - Evolutionary Boiling Water Reactor (1400 MWe) 5) SWR 1000 - Boiling Water Reactor With Passive Features (1000 MWe) In addition, the following subsets are currently being developed: 1) AP1000 - Passive Pressurized Light Water Reactor (2-Loop, 1117 MWe) 2) VVER AES 92 - Pressurized Water Reactor With Passive Features (1000 MWe) The purpose of this paper is to provide an overview of the program, which started in January 2004 with the EUR group to prepare an EUR Volume 3 Subset for the AP1000 nuclear plant design. The AP1000 EUR compliance assessment, to be performed against EUR Revision C requirements, is an important step for the evaluation of the AP1000 design for application in Europe. The AP1000 compliance assessment is making full use of AP1000 licensing documentation, EPP Phase 2 design activities and EP1000 EUR detailed compliance assessment. As of today, nearly all of the EUR Chapters have been discussed within the EUR Coordination Group. Based on the results of the compliance assessment, it can be stated that the AP1000 design shows a good level of compliance with the EUR Revision C requirements. Nevertheless, the compliance assessment has highlighted areas for where the AP1000 plant deviates from the EUR. The EPP design group has selected the most significant ones for performing detailed studies to quantify the degree of compliance

  13. Managing Requirements-Documents to Data

    Science.gov (United States)

    Orr, Kevin; Hudson, Abe

    2017-01-01

    Managing Requirements on long term projects like International Space Station (ISS) can go thru many phases, from initial product development to almost over 20 years of operations and sustainment. Over that time many authorized changes have been made to the requirement set, that apply to any new systems that would visit the ISS today, like commercial cargo/crew vehicles or payloads. Explore the benefits of managing requirements in a database while satisfying traditional documents needs for contracts and stakeholder/user consumption that are not tied into the database.

  14. Identify and Manage the Software Requirements Volatility

    OpenAIRE

    Khloud Abd Elwahab; Mahmoud Abd EL Latif; Sherif Kholeif

    2016-01-01

    Management of software requirements volatility through development of life cycle is a very important stage. It helps the team to control significant impact all over the project (cost, time and effort), and also it keeps the project on track, to finally satisfy the user which is the main success criteria for the software project. In this research paper, we have analysed the root causes of requirements volatility through a proposed framework presenting the requirements volatility causes and how...

  15. Review and evaluation of the Nuclear Materials Management and Safeguards System (NMMSS). Volume 1. Comparison of DOE nuclear materials information system requirements with NMMSS capabilities and recommendations for NMMSS improvements

    International Nuclear Information System (INIS)

    1984-03-01

    This report documents the result of a review of the Nuclear Materials Management and Safeguards System (NMMSS), a Department of Energy nuclear materials control and accountability data base and information processing system. This review was performed to determine what data are required from the NMMSS, how it is collected, and how it is used. Based upon the review, NMMSS deficiencies and excess capabilities were identified and a draft set of requirements for the nuclear materials information system that the Office of Safeguards and Security (OSS) should be supporting as well as recommendations for attaining that capability

  16. Curent requirements for image management in radiotherapy

    International Nuclear Information System (INIS)

    Steil, V.; Schneider, F.; Wenz, F.; Lohr, F.; Roehner, F.; Weisser, G.

    2012-01-01

    Treatment techniques of increasing complexity such as dynamic/rotational techniques mandate digital management and increasingly image guidance. This constantly increases requirements for image management and archiving. This article discusses the current status of these requirements and will present potential image administration strategies. Fundamentals of image administration and storage/archiving are presented (DICOM Standard, radiotherapy-specific issues) along the typical patient pathway (demographic data, radiotherapy treatment planning, signatures/approval of plan and image data, archiving of plan and image data). Different strategies for image management are presented (archiving centered on individual application vs. integral approach with central archiving in a DICOM-RT-PACS governed by a radiation oncology information system (ROCIS)). Infrastructural requirements depending on the amount of image data generated in the department are discussed. Application-centered image management provides access to image data including all relevant RT-specific elements. This approach, however, is not migration-safe, requires significant administrative work to ensure a redundancy level that protects against data loss and does not provide datasets that are linked to respective therapeutic interventions. Therefore, centralized image management and archiving that links images to patients and individual steps in the treatment pathway within a standardized DICOM(-RT) environment is preferable despite occasional problems with visualization of specific data elements. (orig.)

  17. Software requirements management based on use cases

    International Nuclear Information System (INIS)

    Xiao Jin

    2009-01-01

    In this paper, the requirements management based on use cases is theoretically explored, and a multi-layer use-case model is introduced, which combined with three levels of use cases and a single use-case refinement model. Through the practice in a software project, the multi-layer use-case model provides a good solution on how to control the requirements scope and change, and provides the balance of work assignment between customer departments, information management departments and software development outsourcing team. (authors)

  18. Civilian Radioactive Waste Management System Requirements Document

    International Nuclear Information System (INIS)

    1992-12-01

    This document specifies the top-level requirements for the Civilian Radioactive Waste Management System (CRWMS). The document is referred to herein as the CRD, for CRWMS Requirements document. The OCRWM System Engineering Management Plan (SEMP) establishes the technical document hierarchy (hierarchy of technical requirements and configuration baseline documents) for the CRWMS program. The CRD is the top-level document in this hierarchy. The immediate subordinate documents are the System Requirements Documents (SRDS) for the four elements of the CRWMS and the Interface Specification (IFS). The four elements of the CRWMS are the Waste Acceptance System, the Transportation System, the Monitored Retrievable Storage (MRS) System and the Mined Geologic Disposal System (MGDS). The Interface Specification describes the six inter-element interfaces between the four elements. This hierarchy establishes the requirements to be addressed by the design of the system elements. Many of the technical requirements for the CRWMS are documented in a variety of Federal regulations, DOE directives and other Government documentation. It is the purpose of the CRD to establish the technical requirements for the entire program. In doing so, the CRD summarizes source documentation for requirements that must be addressed by the program, specifies particular requirements, and documents derived requirements that are not covered in regulatory and other Government documentation, but are necessary to accomplish the mission of the CRWMS. The CRD defines the CRWMS by identifying the top-level functions the elements must perform (These top-level functions were derived using functional analysis initially documented in the Physical System Requirements (PSR) documents). The CRD also defines the top-level physical architecture of the system and allocates the functions and requirements to the architectural elements of the system

  19. TWRS configuration management requirement source document

    International Nuclear Information System (INIS)

    Vann, J.M.

    1997-01-01

    The TWRS Configuration Management (CM) Requirement Source document prescribes CM as a basic product life-cycle function by which work and activities are conducted or accomplished. This document serves as the requirements basis for the TWRS CM program. The objective of the TWRS CM program is to establish consistency among requirements, physical/functional configuration, information, and documentation for TWRS and TWRS products, and to maintain this consistency throughout the life-cycle of TWRS and the product, particularly as changes are being made

  20. Volume II: Ecosystem management: principles and applications.

    Science.gov (United States)

    M.E. Jensen; P.S. Bourgeron

    1994-01-01

    This document provides land managers with practical suggestions for implementing ecosystem management. It contains 28 papers organized into five sections: historical perspectives, ecological principles, sampling design, case studies, and implementation strategies.

  1. Waste management 86. Volume 1:General interest

    International Nuclear Information System (INIS)

    Post, R.G.

    1986-01-01

    This book presents the papers given at a symposium on radioactive waste management. Topics considered at the symposium included the status of radioactive waste disposal, the status of international nuclear waste management, waste management activities at the Idaho National Engineering Laboratory, legal and liability issues, risk perceptions and public involvement, waste transportation, waste processing, remedial action, decontamination, predisposal processing and treatment processes, low-level and mixed waste management, and mixed chemical and radioactive waste disposal

  2. Requirements Flowdown for Prognostics and Health Management

    Science.gov (United States)

    Goebel, Kai; Saxena, Abhinav; Roychoudhury, Indranil; Celaya, Jose R.; Saha, Bhaskar; Saha, Sankalita

    2012-01-01

    Prognostics and Health Management (PHM) principles have considerable promise to change the game of lifecycle cost of engineering systems at high safety levels by providing a reliable estimate of future system states. This estimate is a key for planning and decision making in an operational setting. While technology solutions have made considerable advances, the tie-in into the systems engineering process is lagging behind, which delays fielding of PHM-enabled systems. The derivation of specifications from high level requirements for algorithm performance to ensure quality predictions is not well developed. From an engineering perspective some key parameters driving the requirements for prognostics performance include: (1) maximum allowable Probability of Failure (PoF) of the prognostic system to bound the risk of losing an asset, (2) tolerable limits on proactive maintenance to minimize missed opportunity of asset usage, (3) lead time to specify the amount of advanced warning needed for actionable decisions, and (4) required confidence to specify when prognosis is sufficiently good to be used. This paper takes a systems engineering view towards the requirements specification process and presents a method for the flowdown process. A case study based on an electric Unmanned Aerial Vehicle (e-UAV) scenario demonstrates how top level requirements for performance, cost, and safety flow down to the health management level and specify quantitative requirements for prognostic algorithm performance.

  3. Mission Plan for the Civilian Radioactive Waste Management Program. Volume I. Part I. Overview and current program plans; Part II. Information required by the Nuclear Waste Policy Act of 1982

    International Nuclear Information System (INIS)

    1985-06-01

    The Misson Plan is divided into two parts. Part I describes the overall goals, objectives, and strategy for the disposal of spent nuclear fuel and high-level waste. It explains that, to meet the directives of the Nuclear Waste Policy Act, the DOE intends to site, design, construct, and start operating a mined geologic repository by January 31, 1998. The Act specifies that the costs of these activities will be borne by the owners and generators of the waste received at the repository. Part I further describes the other components of the waste-management program - monitored retrievable storage, Federal interim storage, and transportation - as well as systems integration activities. Also discussed are institutional plans and activities as well as the program-management system being implemented by the Office of Civilian Radioactive Waste Management. Part II of the Mission Plan presents the detailed information required by Section 301(a) of the Act - key issues and information needs; plans for obtaining the necessary information; potential financial, institutional, and legal issues; plans for the test and evaluation facility; the principal results obtained to date from site investigations; information on the site-characterization programs; information on the waste package; schedules; costs; and socioeconomic impacts. In accordance with Section 301(a) of the Act, Part II is concerned primarily with the repository program

  4. A governor's guide to emergency management. Volume two : homeland security

    Science.gov (United States)

    2002-09-19

    Homeland security is a complex challenge that demands significant investment; collaboration among local, state, and federal governments; and integration with the private sector. The purpose of A Governor's Guide to Emergency Management Volume Two: Ho...

  5. A closed-loop based framework for design requirement management

    DEFF Research Database (Denmark)

    Zhang, Zhinan; Li, Xuemeng; Liu, Zelin

    2014-01-01

    management from product lifecycle, and requirement and requirement management lifecycle views. This paper highlights the importance of requirement lifecycle management and aims at closing the requirement information loop in product lifecycle. Then, it addresses the requirement management in engineering...... design field with focusing on the dynamics nature and incomplete nature of requirements. Finally, a closed-loop based framework is proposed for requirement management in engineering design....

  6. Waste Management Systems Requirements and Descriptions (SRD)

    International Nuclear Information System (INIS)

    Conner, C.W.

    1986-01-01

    The Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a system for the management of high-level radioactive waste and spent fuel in accordance with the Nuclear Waste Policy Act of 1982. The Waste Management system requirements and description document is the program-level technical baseline document. The requirements include the functions that must be performed in order to achieve the system mission and performance criteria for those functions. This document covers only the functional requirements of the system; it does not cover programmatic or procedural requirements pertaining to the processes of designing, siting and licensing. The requirements are largely based on the Nuclear Waste Policy Act of 1982, Environmental Protection Agency standards, Nuclear Regulatory Commission regulations, and DOE orders and guidance. However, nothing in this document should be construed as to relieve the DOE or its contractors from their responsibilities to comply with applicable statutes, regulations, and standards. This document also provides a brief description of the system being developed to meet the requirements. In addition to the described ''authorized system,'' a system description is provided for an ''improved-performance system'' which would include a monitored retrievable storage (MRS) facility. In the event that an MRS facility is approved by Congress, the improved-performance system will become the reference system. Neither system description includes Federal Interim Storage (FIS) capabilities. Should the need for FIS be identified, it will be included as an additional system element. The descriptions are focused on the interfaces between the system elements, rather than on the detail of the system elements themselves

  7. Volume reduction, a safer and cheaper way of radwaste management

    International Nuclear Information System (INIS)

    Mergan, L.M.; Cordier, J.P.; Storrer, J.A.

    1979-01-01

    Development of 'Volume Reduction' has demonstrated that it is a safer and cheaper radwaste management method. Safer, because of several advantages: decrease of solidified product volume, satisfactory product properties, absence of free water, better control of process parameters, increased encapsulation efficiency ... The corresponding impact on the waste management costs, results in important savings on different factors, as well as regards the operational costs as the investment expenses. Economy in the range of BF 35.000 per m 3 of incoming waste is achievable. The main volume reduction techniques readily available are briefly reviewed

  8. Journal of Aquatic Plant Management. Volume 36

    National Research Council Canada - National Science Library

    1998-01-01

    The U.S. Army Corps of Engineers (CE) Aquatic Plant Control Research Program (APCRP) is the Nation's only federally authorized research program directed to develop technology for the management of non-indigenous aquatic plant species...

  9. Small Business Management Volume III: Curriculum. An Adult Education Program.

    Science.gov (United States)

    Persons, Edgar A.; Swanson, Gordon I.

    The small business management adult education program outlined in this curriculum guide is designed to help small business entrepreneurs solve their business management problems and attain the goals they have established for their businesses and their families. (An instructor's manual and practice problems are in separate volumes.) The 3-year…

  10. Management of low-level radioactive waste in the Southeast Compact Region: Volume 2, Management plan: Final report

    International Nuclear Information System (INIS)

    1985-07-01

    The Southeast Compact Commission for Low-Level Radioactive Waste Management has begun the development of a regional low-level radioactive waste management plan. They have reviewed and analyzed existing data on current low-level radioactive waste volumes shipped for disposal by generators in the Southeast region and have supplemented existing data by direct contact with State regulatory personnel, disposal site operators, and individual generators. The Commission has also projected the amounts and types of waste expected to require offsite disposal. This characterized data base and the projections of waste volumes and types through 1996 are included in this volume. Alternative disposal and treatment technologies were evaluated for management of the waste in the region. This evaluation consisted of a review of the literature concerning the several technologies in low level radioactive waste management. This information is summarized in Appendix A. 72 refs., 28 figs., 30 tabs

  11. Managing engineering to meet construction requirements

    International Nuclear Information System (INIS)

    Martin, D.F.; Houchen, J.D.

    1976-01-01

    The San Onofre Units 2 and 3 Project schedule is compared with Bechtel's Generic Nuclear Power Plant schedule. This comparison shows that the major delays experienced on the San Onofre Project have resulted from the regulatory process. To date, Engineering has met Construction's requirements and the Project has not experienced any Engineering related delays. The San Onofre Project has been faced with many uncertainties, such as limited site area, high seismic design criteria, new and changing Federal and State regulations, shifts in supplier market conditions and unpredictable supplier performance. Each of these uncertainties has impacted the Engineering effort and jeopardized project schedule goals. The SCE-Bechtel Engineering Management team has acted to mitigate the impact of these uncertainties through use of a cost trend program, simplification of SCE-Bechtel interfaces, close Engineering-Construction coordination, the use of task forces to handle critical supplier problems and the use of additional Engineering personnel, etc. so that Construction requirements have been met

  12. Simulation Data Management - Requirements and Design Specification

    Energy Technology Data Exchange (ETDEWEB)

    Clay, Robert L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Friedman-Hill, Ernest J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gibson, Marcus J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hoffman, Edward L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Olson, Kevin H. [Science Applications International Corporation (SAIC), Reston, VA (United States); Laney, Daniel [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-11-01

    Simulation Data Management (SDM), the ability to securely organize, archive, and share analysis models and the artifacts used to create them, is a fundamental requirement for modern engineering analysis based on computational simulation. We have worked separately to provide secure, network SDM services to engineers and scientists at our respective laboratories for over a decade. We propose to leverage our experience and lessons learned to help develop and deploy a next-generation SDM service as part of a multi-laboratory team. This service will be portable across multiple sites and platforms, and will be accessible via a range of command-line tools and well-documented APIs. In this document, we’ll review our high-level and low-level requirements for such a system, review one existing system, and briefly discuss our proposed implementation.

  13. MANAGING HIGH-END, HIGH-VOLUME INNOVATIVE PRODUCTS

    Directory of Open Access Journals (Sweden)

    Gembong Baskoro

    2008-01-01

    Full Text Available This paper discuses the concept of managing high-end, high-volume innovative products. High-end, high-volume consumer products are products that have considerable influence to the way of life. Characteristic of High-end, high-volume consumer products are (1 short cycle time, (2 quick obsolete time, and (3 rapid price erosion. Beside the disadvantages that they are high risk for manufacturers, if manufacturers are able to understand precisely the consumer needs then they have the potential benefit or success to be the market leader. High innovation implies to high utilization of the user, therefore these products can influence indirectly to the way of people life. The objective of managing them is to achieve sustainability of the products development and innovation. This paper observes the behavior of these products in companies operated in high-end, high-volume consumer product.

  14. Gravel roads management : volume 1, gravel roads management.

    Science.gov (United States)

    2010-10-01

    This report establishes procedures for managing dirt and gravel roads, with a primary focus on smaller agencies, such as Wyoming counties, that must manage their roads with very limited resources. The report strives, first, to guide and assist smalle...

  15. Gravel roads management : volume 2, gravel roads management : implementation guide.

    Science.gov (United States)

    2011-10-01

    This report establishes procedures for managing dirt and gravel roads, with a primary focus on smaller agencies, such as Wyoming counties, that must manage their roads with very limited resources. The report strives, first, to guide and assist smalle...

  16. Gravel roads management : volume 3, gravel roads management : programming guide.

    Science.gov (United States)

    2010-10-01

    This report establishes procedures for managing dirt and gravel roads, with a primary focus on smaller agencies, such as Wyoming counties, that must manage their roads with very limited resources. The report strives, first, to guide and assist smalle...

  17. Department of Defense Financial Management Regulation. Volume 3. Budget Execution-Availability and Use of Budgetary Resources

    National Research Council Canada - National Science Library

    1996-01-01

    .... In addition, it directs statutory and regulatory financial reporting requirements. Volume 3 of the "DoD Financial Management Regulation" establishes procedures for DoD Components to use in budget execution...

  18. State policies and requirements for management of uranium mining and milling in New Mexico. Volume IV. The supply of electric power and natural gas fuel as possible constraints on uranium production

    International Nuclear Information System (INIS)

    Page, G.B.

    1980-04-01

    The report contained in this volume considers the availability of electric power to supply uranium mines and mills. The report, submited to Sandia Laboratories by the New Mexico Department of Energy and Minerals (EMD), is reproduced without modification. The state concludes that the supply of power, including natural gas-fueled production, will not constrain uranium production

  19. Design requirements for SRB production control system. Volume 2: System requirements and conceptual description

    Science.gov (United States)

    1981-01-01

    In the development of the business system for the SRB automated production control system, special attention had to be paid to the unique environment posed by the space shuttle. The issues posed by this environment, and the means by which they were addressed, are reviewed. The change in management philosphy which will be required as NASA switches from one-of-a-kind launches to multiple launches is discussed. The implications of the assembly process on the business system are described. These issues include multiple missions, multiple locations and facilities, maintenance and refurbishment, multiple sources, and multiple contractors. The implications of these aspects on the automated production control system are reviewed including an assessment of the six major subsystems, as well as four other subsystem. Some general system requirements which flow through the entire business system are described.

  20. Future Communication, Computing, Control and Management Volume 2

    CERN Document Server

    2012-01-01

    This volume contains revised and extended research articles written by prominent researchers participating in the ICF4C 2011 conference. 2011 International Conference on Future Communication, Computing, Control and Management (ICF4C 2011) has been held on December 16-17, 2011, Phuket, Thailand. Topics covered include intelligent computing, network management, wireless networks, telecommunication, power engineering, control engineering, Signal and Image Processing, Machine Learning, Control Systems and Applications, The book will offer the states of arts of tremendous advances in Computing, Communication, Control, and Management and also serve as an excellent reference work for researchers and graduate students working on Computing, Communication, Control, and Management Research.

  1. Future Communication, Computing, Control and Management Volume 1

    CERN Document Server

    2012-01-01

    This volume contains revised and extended research articles written by prominent researchers participating in the ICF4C 2011 conference. 2011 International Conference on Future Communication, Computing, Control and Management (ICF4C 2011) has been held on December 16-17, 2011, Phuket, Thailand. Topics covered include intelligent computing, network management, wireless networks, telecommunication, power engineering, control engineering, Signal and Image Processing, Machine Learning, Control Systems and Applications, The book will offer the states of arts of tremendous advances in Computing, Communication, Control, and Management and also serve as an excellent reference work for researchers and graduate students working on Computing, Communication, Control, and Management Research.

  2. Future Computing, Communication, Control and Management Volume 2

    CERN Document Server

    2012-01-01

    This volume contains revised and extended research articles written by prominent researchers participating in the ICF4C 2011 conference. 2011 International Conference on Future Communication, Computing, Control and Management (ICF4C 2011) has been held on December 16-17, 2011, Phuket, Thailand. Topics covered include intelligent computing, network management, wireless networks, telecommunication, power engineering, control engineering, Signal and Image Processing, Machine Learning, Control Systems and Applications, The book will offer the states of arts of tremendous advances in Computing, Communication, Control, and Management and also serve as an excellent reference work for researchers and graduate students working on Computing, Communication, Control, and Management Research.

  3. Satellite Power Systems (SPS) concept definition study. Volume 6: SPS technology requirements and verification

    Science.gov (United States)

    Hanley, G.

    1978-01-01

    Volume 6 of the SPS Concept Definition Study is presented and also incorporates results of NASA/MSFC in-house effort. This volume includes a supporting research and technology summary. Other volumes of the final report that provide additional detail are as follows: (1) Executive Summary; (2) SPS System Requirements; (3) SPS Concept Evolution; (4) SPS Point Design Definition; (5) Transportation and Operations Analysis; and Volume 7, SPS Program Plan and Economic Analysis.

  4. Safe Management and disposal of nuclear waste. Volume 3

    International Nuclear Information System (INIS)

    1993-01-01

    These proceedings of the international conference Safewaste 93, volume 3 are divided into three poster sessions bearing on: poster session P-1: Radioactive waste management and actinide burning; poster session P-2: Safety aspects of radioactive waste disposal; poster session P-3: Transport and disposal

  5. Technology for Space Station Evolution. Volume 3: EVA/Manned Systems/Fluid Management System

    Science.gov (United States)

    1990-01-01

    NASA's Office of Aeronautics and Space Technology (OAST) conducted a workshop on technology for space station evolution 16-19 Jan. 1990 in Dallas, Texas. The purpose of this workshop was to collect and clarify Space Station Freedom technology requirements for evolution and to describe technologies that can potentially fill those requirements. These proceedings are organized into an Executive Summary and Overview and five volumes containing the Technology Discipline Presentations. Volume 3 consists of the technology discipline sections for Extravehicular Activity/Manned Systems and the Fluid Management System. For each technology discipline, there is a Level 3 subsystem description, along with the papers.

  6. Subsurface contamination focus area technical requirements. Volume II

    International Nuclear Information System (INIS)

    Nickelson, D.; Nonte, J.; Richardson, J.

    1996-10-01

    This is our vision, a vision that replaces the ad hoc or open-quotes delphiclose quotes method which is to get a group of open-quotes expertsclose quotes together and make decisions based upon opinion. To fulfill our vision for the Subsurface Contaminants Focus Area (SCFA), it is necessary to generate technical requirements or performance measures which are quantitative or measurable. Decisions can be supported if they are based upon requirements or performance measures which can be traced to the origin (documented) and are verifiable, i.e., prove that requirements are satisfied by inspection (show me), demonstration, analysis, monitoring, or test. The data from which these requirements are derived must also reflect the characteristics of individual landfills or plumes so that technologies that meet these requirements will necessarily work at specific sites. Other subjective factors, such as stakeholder concerns, do influence decisions. Using the requirements as a basic approach, the SCFA can depend upon objective criteria to help influence the areas of subjectivity, like the stakeholders. In the past, traceable requirements were not generated, probably because it seemed too difficult to do so. There are risks that the requirements approach will not be accepted because it is new and represents a departure from the historical paradigm

  7. Subsurface contamination focus area technical requirements. Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Nickelson, D.; Nonte, J.; Richardson, J.

    1996-10-01

    This is our vision, a vision that replaces the ad hoc or {open_quotes}delphi{close_quotes} method which is to get a group of {open_quotes}experts{close_quotes} together and make decisions based upon opinion. To fulfill our vision for the Subsurface Contaminants Focus Area (SCFA), it is necessary to generate technical requirements or performance measures which are quantitative or measurable. Decisions can be supported if they are based upon requirements or performance measures which can be traced to the origin (documented) and are verifiable, i.e., prove that requirements are satisfied by inspection (show me), demonstration, analysis, monitoring, or test. The data from which these requirements are derived must also reflect the characteristics of individual landfills or plumes so that technologies that meet these requirements will necessarily work at specific sites. Other subjective factors, such as stakeholder concerns, do influence decisions. Using the requirements as a basic approach, the SCFA can depend upon objective criteria to help influence the areas of subjectivity, like the stakeholders. In the past, traceable requirements were not generated, probably because it seemed too difficult to do so. There are risks that the requirements approach will not be accepted because it is new and represents a departure from the historical paradigm.

  8. 76 FR 76917 - Homeless Management Information Systems Requirements

    Science.gov (United States)

    2011-12-09

    ...-P-01] Homeless Management Information Systems Requirements AGENCY: Office of the Assistant Secretary... for the establishment of regulations for Homeless Management Information Systems (HMIS), which are the... community development, Homeless, Information technology system, Management system, Nonprofit organizations...

  9. When Serious Project Management is a Critical Business Requirement

    Science.gov (United States)

    Jansma, P. A.; Gibby, L.; Chambers, C.; Joines, J.; Egger, R.

    2000-01-01

    When serious project management is a critical business requirement, project managers need to integrate cost, schedule and technical scope of work across the project, and apply earned value management (EVM).

  10. 24 CFR 990.290 - Compliance with asset management requirements.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Compliance with asset management... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.290 Compliance with asset management requirements. (a) A PHA is considered in compliance with asset management requirements...

  11. 45 CFR 2551.93 - What are grants management requirements?

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false What are grants management requirements? 2551.93... AND COMMUNITY SERVICE SENIOR COMPANION PROGRAM Application and Fiscal Requirements § 2551.93 What are grants management requirements? What rules govern a sponsor's management of grants? (a) A sponsor shall...

  12. 45 CFR 2552.93 - What are grants management requirements?

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false What are grants management requirements? 2552.93... AND COMMUNITY SERVICE FOSTER GRANDPARENT PROGRAM Application and Fiscal Requirements § 2552.93 What are grants management requirements? What rules govern a sponsor's management of grants? (a) A sponsor...

  13. 12 CFR 652.20 - Liquidity reserve management and requirements.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Liquidity reserve management and requirements... AGRICULTURAL MORTGAGE CORPORATION FUNDING AND FISCAL AFFAIRS Investment Management § 652.20 Liquidity reserve management and requirements. (a) Minimum liquidity reserve requirement. Within 24 months of this rule...

  14. Tank Farms Technical Safety Requirements. Volume 1 and 2

    International Nuclear Information System (INIS)

    CASH, R.J.

    2000-01-01

    The Technical Safety Requirements (TSRs) define the acceptable conditions, safe boundaries, basis thereof, and controls to ensure safe operation during authorized activities, for facilities within the scope of the Tank Waste Remediation System (TWRS) Final Safety Analysis Report (FSAR)

  15. Geostatistical approach for assessing soil volumes requiring remediation: validation using lead-polluted soils underlying a former smelting works.

    Science.gov (United States)

    Demougeot-Renard, Helene; De Fouquet, Chantal

    2004-10-01

    Assessing the volume of soil requiring remediation and the accuracy of this assessment constitutes an essential step in polluted site management. If this remediation volume is not properly assessed, misclassification may lead both to environmental risks (polluted soils may not be remediated) and financial risks (unexpected discovery of polluted soils may generate additional remediation costs). To minimize such risks, this paper proposes a geostatistical methodology based on stochastic simulations that allows the remediation volume and the uncertainty to be assessed using investigation data. The methodology thoroughly reproduces the conditions in which the soils are classified and extracted at the remediation stage. The validity of the approach is tested by applying it on the data collected during the investigation phase of a former lead smelting works and by comparing the results with the volume that has actually been remediated. This real remediated volume was composed of all the remediation units that were classified as polluted after systematic sampling and analysis during clean-up stage. The volume estimated from the 75 samples collected during site investigation slightly overestimates (5.3% relative error) the remediated volume deduced from 212 remediation units. Furthermore, the real volume falls within the range of uncertainty predicted using the proposed methodology.

  16. 12 CFR 652.10 - Investment management and requirements.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Investment management and requirements. 652.10... MORTGAGE CORPORATION FUNDING AND FISCAL AFFAIRS Investment Management § 652.10 Investment management and... policies for managing your non-program investment activities. Your board must also ensure that management...

  17. Space Tug avionics definition study. Volume 2: Avionics functional requirements

    Science.gov (United States)

    1975-01-01

    Flight and ground operational phases of the tug/shuttle system are analyzed to determine the general avionics support functions that are needed during each of the mission phases and sub-phases. Each of these general support functions is then expanded into specific avionics system requirements, which are then allocated to the appropriate avionics subsystems. This process is then repeated at the next lower level of detail where these subsystem requirements are allocated to each of the major components that comprise a subsystem.

  18. Vehicle Health Management Communications Requirements for AeroMACS

    Science.gov (United States)

    Kerczewski, Robert J.; Clements, Donna J.; Apaza, Rafael D.

    2012-01-01

    As the development of standards for the aeronautical mobile airport communications system (AeroMACS) progresses, the process of identifying and quantifying appropriate uses for the system is progressing. In addition to defining important elements of AeroMACS standards, indentifying the systems uses impacts AeroMACS bandwidth requirements. Although an initial 59 MHz spectrum allocation for AeroMACS was established in 2007, the allocation may be inadequate; studies have indicated that 100 MHz or more of spectrum may be required to support airport surface communications. Hence additional spectrum allocations have been proposed. Vehicle health management (VHM) systems, which can produce large volumes of vehicle health data, were not considered in the original bandwidth requirements analyses, and are therefore of interest in supporting proposals for additional AeroMACS spectrum. VHM systems are an emerging development in air vehicle safety, and preliminary estimates of the amount of data that will be produced and transmitted off an aircraft, both in flight and on the ground, have been prepared based on estimates of data produced by on-board vehicle health sensors and initial concepts of data processing approaches. This allowed an initial estimate of VHM data transmission requirements for the airport surface. More recently, vehicle-level systems designed to process and analyze VHM data and draw conclusions on the current state of vehicle health have been undergoing testing and evaluation. These systems make use of vehicle system data that is mostly different from VHM data considered previously for airport surface transmission, and produce processed system outputs that will be also need to be archived, thus generating additional data load for AeroMACS. This paper provides an analysis of airport surface data transmission requirements resulting from the vehicle level reasoning systems, within the context of overall VHM data requirements.

  19. Projecting future solid waste management requirements on the Hanford Site

    International Nuclear Information System (INIS)

    Shaver, S.R.; Stiles, D.L.; Holter, G.M.; Anderson, B.C.

    1990-09-01

    The problem of treating and disposing of hazardous transuranic (TRU), low-level radioactive, and mixed waste has become a major concern of the public and the government. At the US Department of Energy's Hanford Site in Washington state, the problem is compounded by the need to characterize, retrieve, and treat the solid waste that was generated and stored for retrieval during the past 20 years. This paper discusses the development and application of a Solid Waste Projection Model that uses forecast volumes and characteristics of existing and future solid waste to address the treatment, storage, and disposal requirements at Hanford. The model uses a data-driven, object-oriented approach to assess the storage and treatment throughout requirements for each operation for each of the distinct waste classes and the accompanying cost of the storage and treatment operations. By defining the elements of each alternative for the total waste management system, the same database can be used for numerous analyses performed at different levels of detail. This approach also helps a variety of users with widely varying information requirements to use the model and helps achieve the high degree of flexibility needed to cope with changing regulations and evolving treatment and disposal technologies. 2 figs

  20. Reserve Requirements and Monetary Management; An Introduction

    OpenAIRE

    International Monetary Fund

    1993-01-01

    Reserve requirements are widely used by central banks as a means to improve monetary control, an instrument for policy implementation, a source of revenue, and a safeguard of bank liquidity. The effectiveness of reserve requirements in fulfilling these functions is reviewed, and the detailed modalities of their use are examined. Reserve requirements in a sample of developing countries are described.

  1. Space transfer vehicle concepts and requirements, volume 2, book 1

    Science.gov (United States)

    1991-01-01

    The objective of the systems engineering task was to develop and implement an approach that would generate the required study products as defined by program directives. This product list included a set of system and subsystem requirements, a complete set of optimized trade studies and analyses resulting in a recommended system configuration, and the definition of an integrated system/technology and advanced development growth path. A primary ingredient in the approach was the TQM philosophy stressing job quality from the inception. Included throughout the Systems Engineering, Programmatics, Concepts, Flight Design, and Technology sections are data supporting the original objectives as well as supplemental information resulting from program activities. The primary result of the analyses and studies was the recommendation of a single propulsion stage Lunar Transportation System (LTS) configuration that supports several different operations scenarios with minor element changes. This concept has the potential to support two additional scenarios with complex element changes. The space based LTS concept consists of three primary configurations--Piloted, Reusable Cargo, and Expendable Cargo.

  2. 46 CFR 16.500 - Management Information System requirements.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Management Information System requirements. 16.500 Section 16.500 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN CHEMICAL TESTING Management Information System § 16.500 Management Information System requirements. (a...

  3. 45 CFR 2553.73 - What are grants management requirements?

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false What are grants management requirements? 2553.73 Section 2553.73 Public Welfare Regulations Relating to Public Welfare (Continued) CORPORATION FOR NATIONAL... § 2553.73 What are grants management requirements? What rules govern a sponsor's management of grants? (a...

  4. 49 CFR 1105.9 - Coastal Zone Management Act requirements.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Coastal Zone Management Act requirements. 1105.9... ENVIRONMENTAL LAWS § 1105.9 Coastal Zone Management Act requirements. (a) If the proposed action affects land or water uses within a State coastal zone designated pursuant to the Coastal Zone Management Act (16 U.S.C...

  5. 47 CFR 97.513 - VE session manager requirements.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false VE session manager requirements. 97.513 Section... SERVICES AMATEUR RADIO SERVICE Qualifying Examination Systems § 97.513 VE session manager requirements. (a) A VE session manager may be selected by the VE team for each examination session. The VE session...

  6. 76 FR 3697 - Risk Management Requirements for Derivatives Clearing Organizations

    Science.gov (United States)

    2011-01-20

    ... Part II Commodity Futures Trading Commission 17 CFR Part 39 Risk Management Requirements for... RIN 3038-AC98 Risk Management Requirements for Derivatives Clearing Organizations AGENCY: Commodity... (Participant and Product Eligibility), D (Risk Management), E (Settlement Procedures), F (Treatment of Funds...

  7. 7 CFR 760.104 - Risk management purchase requirements.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false Risk management purchase requirements. 760.104 Section... Agricultural Disaster Assistance Programs § 760.104 Risk management purchase requirements. (a) To be eligible... available from the USDA Risk Management Agency (RMA)) obtained catastrophic coverage or better under a...

  8. The Management System for Facilities and Activities. Safety Requirements

    International Nuclear Information System (INIS)

    2011-01-01

    This publication establishes requirements for management systems that integrate safety, health, security, quality assurance and environmental objectives. A successful management system ensures that nuclear safety matters are not dealt with in isolation but are considered within the context of all these objectives. The aim of this publication is to assist Member States in establishing and implementing effective management systems that integrate all aspects of managing nuclear facilities and activities in a coherent manner. It details the planned and systematic actions necessary to provide adequate confidence that all these requirements are satisfied. Contents: 1. Introduction; 2. Management system; 3. Management responsibility; 4. Resource management; 5. Process implementation; 6. Measurement, assessment and improvement.

  9. The analysis of the program to develop the Nuclear Waste Management System: Allocated requirements for the Office of Civilian Radioactive Waste Management Program

    International Nuclear Information System (INIS)

    Woods, T.W.

    1991-09-01

    This report is volume 3, part B, of the program to satisfy the allocated requirements of the Office of Civilian Radioactive Waste Management Program, in the development of the nuclear waste management system. The report is divided into the following sections: regulatory compliance; external relations; international programs; strategic and contingency planning; contract business management; and administrative services. (CS)

  10. Requirements Flowdown for Prognostics and Health Management

    Data.gov (United States)

    National Aeronautics and Space Administration — Prognostics and Health Management (PHM) principles have considerable promise to change the game of lifecycle cost of engineering systems at high safety levels by...

  11. Identification of Requirements for Distribution Management Systems in the Smart Grid Context

    DEFF Research Database (Denmark)

    Rezkalla, Michel M.N.; Heussen, Kai; Marinelli, Mattia

    2015-01-01

    The integration of significant volumes of distributed and renewable energy resources directly connected to the distribution network raises new requirement to maintain and operate the power system in secure state. Thus the Distribution Management System (DMS) needs to be updated and integrated...

  12. [Does clinical risk management require a structured conflict management?].

    Science.gov (United States)

    Neumann, Stefan

    2015-01-01

    A key element of clinical risk management is the analysis of errors causing near misses or patient damage. After analyzing the causes and circumstances, measures for process improvement have to be taken. Process management, human resource development and other established methods are used. If an interpersonal conflict is a contributory factor to the error, there is usually no structured conflict management available which includes selection criteria for various methods of conflict processing. The European University Viadrina in Frankfurt (Oder) has created a process model for introducing a structured conflict management system which is suitable for hospitals and could fill the gap in the methodological spectrum of clinical risk management. There is initial evidence that a structured conflict management reduces staff fluctuation and hidden conflict costs. This article should be understood as an impulse for discussion on to what extent the range of methods of clinical risk management should be complemented by conflict management.

  13. Nuclear power. Volume 2. Nuclear power project management

    International Nuclear Information System (INIS)

    Pedersen, E.S.

    1978-01-01

    NUCLEAR POWER PLANT DESIGN is intended to be used as a working reference book for management, engineers and designers, and as a graduate-level text for engineering students. The book is designed to combine theory with practical nuclear power engineering and design experience, and to give the reader an up-to-date view of the status of nuclear power and a basic understanding of how nuclear power plants function. Volume 2 contains the following chapters: (1) review of nuclear power plants; (2) licensing procedures; (3) safety analysis; (4) project professional services; (5) quality assurance and project organization; (6) construction, scheduling, and operation; (7) nuclear fuel handling and fuel management; (8) plant cost management; and (9) conclusion

  14. Evaluation of motion management strategies based on required margins

    International Nuclear Information System (INIS)

    Sawkey, D; Svatos, M; Zankowski, C

    2012-01-01

    Strategies for delivering radiation to a moving lesion each require a margin to compensate for uncertainties in treatment. These motion margins have been determined here by separating the total uncertainty into components. Probability density functions for the individual sources of uncertainty were calculated for ten motion traces obtained from the literature. Motion margins required to compensate for the center of mass motion of the clinical treatment volume were found by convolving the individual sources of uncertainty. For measurements of position at a frequency of 33 Hz, system latency was the dominant source of positional uncertainty. Averaged over the ten motion traces, the motion margin for tracking with a latency of 200 ms was 4.6 mm. Gating with a duty cycle of 33% required a mean motion margin of 3.2–3.4 mm, and tracking with a latency of 100 ms required a motion margin of 3.1 mm. Feasible reductions in the effects of the sources of uncertainty, for example by using a simple prediction algorithm to anticipate the lesion position at the end of the latency period, resulted in a mean motion margin of 1.7 mm for tracking with a latency of 100 ms, 2.4 mm for tracking with a latency of 200 ms, and 2.1–2.2 mm for the gating strategies with duty cycles of 33%. A crossover tracking latency of 150 ms was found, below which tracking strategies could take advantage of narrower motion margins than gating strategies. The methods described here provide a means to guide selection of a motion management strategy for a given patient. (paper)

  15. Requirements and Tools for Variability Management

    NARCIS (Netherlands)

    Aiello, Marco; Bulanov, Pavel; Groefsema, Heerko

    2010-01-01

    Explicit and software-supported Business Process Management has become the core infrastructure of any medium and large organization that has a need to be efficient and effective. The number of processes of a single organization can be very high, furthermore, they might be very similar, be in need of

  16. CNEN, IAEA and ISO normative requirements for measurement management

    International Nuclear Information System (INIS)

    Kibrit, Eduardo

    2009-01-01

    International standard ISO 10012:2003 establishes requirements for measurement management systems, including requirements for measurement processes and measuring equipment. ISO 9001:2008 presents requirements for quality management systems, including requirements for the control of monitoring and measuring equipment. ISO 17025:2005 presents general requirements for the competence of testing and calibration laboratories. In the nuclear field the requirements for measurement management are established by standards published by the International Atomic Energy Agency (IAEA), and in Brazil, by the National Nuclear Energy Commission (CNEN). The present paper presents and discusses the normative requirements for measurement management, considering requirements established by National Nuclear Energy Commission (CNEN), International Atomic Energy Agency (IAEA), and International Organisation for Standardisation (ISO). (author)

  17. The influence of management and construction methods in the repair costs of Spain’s low-volume road network

    Directory of Open Access Journals (Sweden)

    Eutiquio Gallego

    2016-06-01

    Full Text Available This paper describes the entire process of the implementation of the Spanish low volume road network, including the design criteria, the construction techniques and the management policies during all the periods. The current situation of low volume roads in Spain was analyzed with respect to the legal framework and their actual condition. In addition, the budget required for the repair of 41 low volume roads throughout Spain was calculated in order to statistically analyze the influence of the pavement materials and the period of construction. The main conclusions were that low volume roads constructed during the 1970´s are currently those in the best state of repair and those requiring the lower repair costs, even lower than those constructed after 1980´s. In addition, low volume roads constructed with higher quality materials and using standardized techniques required five times lower repair costs than those made of lower quality materials.

  18. Scope Management of Non-Functional Requirements

    NARCIS (Netherlands)

    Kassab, M.; Daneva, Maia; Ormandjieva, O.; Mueller, P.; Lyggesmeyer, P.; Maehle, E.

    2007-01-01

    In order to meet commitments in software projects, a realistic assessment must be made of project scope. Such an assessment relies on the availability of knowledge on the user-defined project requirements and their effort estimates and priorities, as well as their risk. This knowledge enables

  19. Remote sensing for environmental monitoring and resource management. Volume 2

    International Nuclear Information System (INIS)

    1992-01-01

    The subject of this volume is remote sensing for environmental monitoring and resource management. This session is divided in eight parts. First part is on general topics, methodology and meteorology. Second part is on geology, environment and land cover. Third part is on disaster monitoring. Fourth part is on operational status of remote sensing. Fifth part is on coastal zones and inland waters. Sixth and seventh parts are on forestry and agriculture. Eighth part is on instrumentation and systems. (A.B.). refs., figs., tabs

  20. Produced water volumes and management practices in the United States.

    Energy Technology Data Exchange (ETDEWEB)

    Clark, C. E.; Veil, J. A. (Environmental Science Division)

    2009-09-01

    Produced water volume generation and management in the United States are not well characterized at a national level. The U.S. Department of Energy (DOE) asked Argonne National Laboratory to compile data on produced water associated with oil and gas production to better understand the production volumes and management of this water. The purpose of this report is to improve understanding of produced water by providing detailed information on the volume of produced water generated in the United States and the ways in which produced water is disposed or reused. As the demand for fresh water resources increases, with no concomitant increase in surface or ground water supplies, alternate water sources, like produced water, may play an important role. Produced water is water from underground formations that is brought to the surface during oil or gas production. Because the water has been in contact with hydrocarbon-bearing formations, it contains some of the chemical characteristics of the formations and the hydrocarbons. It may include water from the reservoir, water previously injected into the formation, and any chemicals added during the production processes. The physical and chemical properties of produced water vary considerably depending on the geographic location of the field, the geologic formation, and the type of hydrocarbon product being produced. Produced water properties and volume also vary throughout the lifetime of a reservoir. Produced water is the largest volume by-product or waste stream associated with oil and gas exploration and production. Previous national produced water volume estimates are in the range of 15 to 20 billion barrels (bbl; 1 bbl = 42 U.S. gallons) generated each year in the United States (API 1988, 2000; Veil et al. 2004). However, the details on generation and management of produced water are not well understood on a national scale. Argonne National Laboratory developed detailed national-level information on the volume of produced

  1. Management of Operational Support Requirements for Manned Flight Missions

    Science.gov (United States)

    1991-01-01

    This Instruction establishes responsibilities for managing the system whereby operational support requirements are levied for support of manned flight missions including associated payloads. This management system will ensure that support requirements are properly requested and responses are properly obtained to meet operational objectives.

  2. Estimating the cold war mortgage: The 1995 baseline environmental management report. Volume II: Site summaries

    International Nuclear Information System (INIS)

    1995-03-01

    This volume, Volume II presents the site data that was used to generate the Department of Energy's (DOE) initial Baseline Environmental Management Report (BEMR). The raw data was obtained by DOE field personnel from existing information sources and anticipated environmental management strategies for their sites and was tempered by general assumptions and guidance developed by DOE Headquarters personnel. This data was then integrated by DOE Headquarters personnel and modified to ensure that overall constraints such as funding and waste management capacity were addressed. The site summaries are presented by State and broken out by discrete activities and projects. The Volume I Glossary has been repeated to facilitate the reader's review of Volume II. The information presented in the site summaries represents the best data and assumptions available as of February 1, 1995. Assumptions that have not been mandated by formal agreement with appropriate regulators and other stakeholders do not constitute decisions by the Department nor do they supersede existing agreements. In addition, actions requiring decisions from external sources regarding unknowns such as future land use and funding/scheduling alternatives, as well as internal actions such as the Department's Strategic Realignment initiative, will alter the basis and general assumptions used to generate the results for this report. Consequently, the numbers presented in the site summaries do not represent outyear budget requests by the field installations

  3. Hanford Tanks Initiative requirements and document management process guide

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1998-01-01

    This revision of the guide provides updated references to project management level Program Management and Assessment Configuration Management activities, and provides working level directions for submitting requirements and project documentation related to the Hanford Tanks Initiative (HTI) project. This includes documents and information created by HTI, as well as non-HTI generated materials submitted to the project

  4. 23 CFR 973.204 - Management systems requirements.

    Science.gov (United States)

    2010-04-01

    ... system; (2) A process to operate and maintain the management systems and their associated databases; (3... may include consultation with the tribes, as appropriate. (k) The management systems shall be operated... 23 Highways 1 2010-04-01 2010-04-01 false Management systems requirements. 973.204 Section 973.204...

  5. 24 CFR 964.120 - Resident management corporation requirements.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Resident management corporation... § 964.120 Resident management corporation requirements. A resident management corporation must consist... resident council, so long as each such council: (1) Approves the establishment of the corporation; and (2...

  6. Training Requirements and Information Management System. Software user guide

    Energy Technology Data Exchange (ETDEWEB)

    Cillan, T.F.; Hodgson, M.A.

    1992-05-01

    This is the software user`s guide for the Training Requirements and Information Management System. This guide defines and describes the software operating procedures as they apply to the end user of the software program. This guide is intended as a reference tool for the user who already has an indepth knowledge of the Training Requirements and Information Management System functions and data reporting requirement.

  7. Economic Requirements of Water Resources Management

    Directory of Open Access Journals (Sweden)

    Nasser Khiabani

    2017-03-01

    Full Text Available Indicators of water resources status and water consumption in Iran reveal an imbalance between supply and demand. This is compounded by the current unrealistic water price that signals the inefficiency of the water market in Iran. In economics parlance, the most important factors responsible for the low efficiency of water market are inaccurate valuation and failure to define the ownership rights of water. Low prices, low sensitivity of water demand to prices, and the lack of proper inputs as substitutes for water resources have collectively contributed to excessive pressures on the available water resources for domestic, industrial, and agricultural uses. A brief glance reveals that water resources in Iran are merely priced based on cost accounting. This is while study has shown that developed countries adopt approaches to water pricing that not only consider the final cost of water but also take into account such other parameters that are affected by intrinsic value of water including its bequest and existence values. The present paper draws upon the concepts of value, expenses, and pricing of water in an attempt to explore the marketing and pricing of water resources as the two major tools economists employ in the management of these resources. It is the objective of the study to arrive at an accurate definition of ownership rights of water resources to improve upon the present water marketing. In doing so, the more important components of modern pricing strategies adopted by developed nations will also be investigated. Results indicate that the present cost accounting method used in pricing water in Iran will in the long-run lead to the wastage of water resources and that it should, therefore, be given up in favor modern and more realistic policies to avoid such waste of resources.

  8. Predisposal Management of Radioactive Waste. General Safety Requirements Pt. 5

    International Nuclear Information System (INIS)

    2010-01-01

    There are a large number of facilities and activities around the world in which radioactive material is produced, handled and stored. This Safety Requirements publication presents international consensus requirements for the management of radioactive waste prior to its disposal. It provides the safety imperatives on the basis of which facilities can be designed, operated and regulated. The publication is supported by a number of Safety Guides that provide up to date recommendations and guidance on best practices for management of particular types of radioactive waste, for storage of radioactive waste, for assuring safety by developing safety cases and supporting safety assessments, and for applying appropriate management systems. Contents: 1. Introduction; 2. Protection of human health and the environment; 3. Responsibilities associated with the predisposal management of radioactive waste; 4. Steps in the predisposal management of radioactive waste; 5. Development and operation of predisposal radioactive waste management facilities and activities; Annex: Predisposal management of radioactive waste and the fundamental safety principles.

  9. Predisposal Management of Radioactive Waste. General Safety Requirements Pt. 5

    International Nuclear Information System (INIS)

    2009-01-01

    There are a large number of facilities and activities around the world in which radioactive material is produced, handled and stored. This Safety Requirements publication presents international consensus requirements for the management of radioactive waste prior to its disposal. It provides the safety imperatives on the basis of which facilities can be designed, operated and regulated. The publication is supported by a number of Safety Guides that provide up to date recommendations and guidance on best practices for management of particular types of radioactive waste, for storage of radioactive waste, for assuring safety by developing safety cases and supporting safety assessments, and for applying appropriate management systems. Contents: 1. Introduction; 2. Protection of human health and the environment; 3. Responsibilities associated with the predisposal management of radioactive waste; 4. Steps in the predisposal management of radioactive waste; 5. Development and operation of predisposal radioactive waste management facilities and activities; Annex: Predisposal management of radioactive waste and the fundamental safety principles.

  10. Security Requirements Management in Software Product Line Engineering

    Science.gov (United States)

    Mellado, Daniel; Fernández-Medina, Eduardo; Piattini, Mario

    Security requirements engineering is both a central task and a critical success factor in product line development due to the complexity and extensive nature of product lines. However, most of the current product line practices in requirements engineering do not adequately address security requirements engineering. Therefore, in this chapter we will propose a security requirements engineering process (SREPPLine) driven by security standards and based on a security requirements decision model along with a security variability model to manage the variability of the artefacts related to security requirements. The aim of this approach is to deal with security requirements from the early stages of the product line development in a systematic way, in order to facilitate conformance with the most relevant security standards with regard to the management of security requirements, such as ISO/IEC 27001 and ISO/IEC 15408.

  11. Waste management research abstracts volume 27. Information on radioactive waste management research in progress or planned

    International Nuclear Information System (INIS)

    2002-10-01

    This issue of the Waste Management Research Abstracts (WMRA) contains 148 abstracts that describe research in progress in the field of radioactive waste management. The research abstracts contained in Volume 27 (WMRA 27) were collected between July 1, 2001 and September 30, 2002. The abstracts present ongoing work in various countries and international organizations. Although the abstracts are indexed by country, many programmes are actually the result of co-operation among several countries. Indeed, a primary reason for providing this compilation of programmes, institutions and scientists engaged in research into radioactive waste management is to increase international co-operation and facilitate communications

  12. Volume reduction options for the management of low-level radioactive wastes

    International Nuclear Information System (INIS)

    Clark, D.E.; Lerch, R.E.

    1979-01-01

    Volume reduction options that are now or soon will be available for low-level wastes are examined. These wastes generally are in the form of combustible solids, noncombustible solids, and wet wastes (solid/liquid). Initially, the wastes are collected and stored onsite. Preconditioning may be required, e.g., sorting, shredding, and classifying the solids into combustible and noncombustible fractions. The volume of combustible solids can be reduced by compaction, incineration/pyrolysis, acid digestion, or molten salt combustion. Options for reducing the volume of noncombustible solids include compaction, size reduction and decontamination, meltdown-casting, dissolution and electropolishing. Burnable wet wastes (e.g., organic wastes) can be evaporated or combusted; nonburnable wet wastes can be treated by various evaporative or nonevaporative processes. All radioactive waste processing operations result in some equipment contamination and the production of additional radioactively contaminated wastes (secondary wastes). The additional waste quantities must be considered in evaluating performance and overall volume reduction factors for the various systems. In the selection of an optimum waste management plan for a given facility, other important factors (e.g., relative stability of the waste product form) should be considered along with the savings accrued due to volume reduction

  13. 13 CFR 107.150 - Management-ownership diversity requirement.

    Science.gov (United States)

    2010-01-01

    ... minimum numerical listing standards and the corporate governance listing standards of the New York Stock... requirement as in effect at the time it was first applicable to you or you may satisfy the management...

  14. Several required OWL features for indigenous knowledge management systems

    CSIR Research Space (South Africa)

    Alberts, R

    2012-05-01

    Full Text Available This paper describes the features required of OWL (Web Ontology Language) to realise and enhance Indigenous Knowledge (IK) digital repositories. Several needs for Indigenous Knowledge management systems (IKMSs) are articulated, based on extensive...

  15. Leadership and Management for Safety. General Safety Requirements (Spanish Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    his Safety Requirements publication establishes requirements that support Principle 3 of the Fundamental Safety Principles in relation to establishing, sustaining and continuously improving leadership and management for safety and an integrated management system. It emphasizes that leadership for safety, management for safety, an effective management system and a systemic approach (i.e. an approach in which interactions between technical, human and organizational factors are duly considered) are all essential to the specification and application of adequate safety measures and to the fostering of a strong safety culture. Leadership and an effective management system will integrate safety, health, environmental, security, quality, human-and-organizational factors, societal and economic elements. The management system will ensure the fostering of a strong safety culture, regular assessment of performance and the application of lessons from experience. The publication is intended for use by regulatory bodies, operating organizations and other organizations concerned with facilities and activities that give rise to radiation risks.

  16. Leadership and Management for Safety. General Safety Requirements (French Edition)

    International Nuclear Information System (INIS)

    2016-01-01

    This Safety Requirements publication establishes requirements that support Principle 3 of the Fundamental Safety Principles in relation to establishing, sustaining and continuously improving leadership and management for safety and an integrated management system. It emphasizes that leadership for safety, management for safety, an effective management system and a systemic approach (i.e. an approach in which interactions between technical, human and organizational factors are duly considered) are all essential to the specification and application of adequate safety measures and to the fostering of a strong safety culture. Leadership and an effective management system will integrate safety, health, environmental, security, quality, human-and-organizational factors, societal and economic elements. The management system will ensure the fostering of a strong safety culture, regular assessment of performance and the application of lessons from experience. The publication is intended for use by regulatory bodies, operating organizations and other organizations concerned with facilities and activities that give rise to radiation risks.

  17. Leadership and Management for Safety. General Safety Requirements (Arabic Edition)

    International Nuclear Information System (INIS)

    2016-01-01

    This Safety Requirements publication establishes requirements that support Principle 3 of the Fundamental Safety Principles in relation to establishing, sustaining and continuously improving leadership and management for safety and an integrated management system. It emphasizes that leadership for safety, management for safety, an effective management system and a systemic approach (i.e. an approach in which interactions between technical, human and organizational factors are duly considered) are all essential to the specification and application of adequate safety measures and to the fostering of a strong safety culture. Leadership and an effective management system will integrate safety, health, environmental, security, quality, human-and-organizational factors, societal and economic elements. The management system will ensure the fostering of a strong safety culture, regular assessment of performance and the application of lessons from experience. The publication is intended for use by regulatory bodies, operating organizations and other organizations concerned with facilities and activities that give rise to radiation risks.

  18. Leadership and Management for Safety. General Safety Requirements (Chinese Edition)

    International Nuclear Information System (INIS)

    2016-01-01

    This Safety Requirements publication establishes requirements that support Principle 3 of the Fundamental Safety Principles in relation to establishing, sustaining and continuously improving leadership and management for safety and an integrated management system. It emphasizes that leadership for safety, management for safety, an effective management system and a systemic approach (i.e. an approach in which interactions between technical, human and organizational factors are duly considered) are all essential to the specification and application of adequate safety measures and to the fostering of a strong safety culture. Leadership and an effective management system will integrate safety, health, environmental, security, quality, human-and-organizational factors, societal and economic elements. The management system will ensure the fostering of a strong safety culture, regular assessment of performance and the application of lessons from experience. The publication is intended for use by regulatory bodies, operating organizations and other organizations concerned with facilities and activities that give rise to radiation risks.

  19. Leadership and Management for Safety. General Safety Requirements

    International Nuclear Information System (INIS)

    2016-01-01

    This Safety Requirements publication establishes requirements that support Principle 3 of the Fundamental Safety Principles in relation to establishing, sustaining and continuously improving leadership and management for safety and an integrated management system. It emphasizes that leadership for safety, management for safety, an effective management system and a systemic approach (i.e. an approach in which interactions between technical, human and organizational factors are duly considered) are all essential to the specification and application of adequate safety measures and to the fostering of a strong safety culture. Leadership and an effective management system will integrate safety, health, environmental, security, quality, human-and-organizational factor, societal and economic elements. The management system will ensure the fostering of a strong safety culture, regular assessment of performance and the application of lessons from experience. The publication is intended for use by regulatory bodies, operating organizations (registrants and licensees) and other organizations concerned with facilities and activities that give rise to radiation risks

  20. Department of Energy Emergency Management Functional Requirements Study

    International Nuclear Information System (INIS)

    1987-05-01

    This Study, the Emergency Management Functional Requirements Study (EMFRS), identifies the physical environment, information resources, and equipment required in the DOE Headquarters Emergency Operations Center (EOC) to support the DOE staff in managing an emergency. It is the first step toward converting the present Forrestal EOC into a practical facility that will function well in each of the highly diverse types of emergencies in which the Department could be involved. 2 figs

  1. Predisposal management of radioactive waste. General safety requirements. Pt. 5

    International Nuclear Information System (INIS)

    2009-01-01

    The objective of this Safety Requirements publication is to establish, the requirements that must be satisfied in the predisposal management of radioactive waste. This publication sets out the objectives, criteria and requirements for the protection of human health and the environment that apply to the siting, design, construction, commissioning, operation and shutdown of facilities for the predisposal management of radioactive waste, and the requirements that must be met to ensure the safety of such facilities and activities. This Safety Requirements publication applies to the predisposal management of radioactive waste of all types and covers all the steps in its management from its generation up to its disposal, including its processing (pretreatment, treatment and conditioning), storage and transport. Such waste may arise from the commissioning, operation and decommissioning of nuclear facilities; the use of radionuclides in medicine, industry, agriculture, research and education; the processing of materials that contain naturally occurring radionuclides; and the remediation of contaminated areas. The introduction of the document (Section 1) informs about its objective, scope and structure. The protection of human health and the environment is considered in Section 2 of this publication. Section 3 establishes requirements for the responsibilities associated with the predisposal management of radioactive waste. Requirements for the principal approaches to and the elements of the predisposal management of radioactive waste are established in Section 4. Section 5 establishes requirements for the safe development and operation of predisposal radioactive waste management facilities and safe conduct of activities. The Annex presents a discussion of the consistency of the safety requirements established in this publication with the fundamental safety principles

  2. 75 FR 78185 - Information Management Requirements for Derivatives Clearing Organizations

    Science.gov (United States)

    2010-12-15

    ... Principles J, K, L and M. This is based on the Commission's view that rigorous information management... COMMODITY FUTURES TRADING COMMISSION 17 CFR Parts 1, 21, and 39 RIN 3038-AC98 Information Management Requirements for Derivatives Clearing Organizations AGENCY: Commodity Futures Trading Commission...

  3. 14 CFR 142.13 - Management and personnel requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Management and personnel requirements. 142... (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES TRAINING CENTERS General § 142.13 Management and... curriculum leading to airman certificates or ratings, or both; (c) The training center has, and shall...

  4. 78 FR 29247 - Contractor Legal Management Requirements; Acquisition Regulations; Correction

    Science.gov (United States)

    2013-05-20

    ... DEPARTMENT OF ENERGY 48 CFR Part 952 RIN 1990-AA37 Contractor Legal Management Requirements; Acquisition Regulations; Correction AGENCY: Department of Energy. ACTION: Final rule; correction. SUMMARY: The... (78 FR 25795). In this document, DOE revised existing regulations covering contractor legal management...

  5. De-Mystifying the Data Management Requirements of Research Funders

    Science.gov (United States)

    Dietrich, Dianne; Adamus, Trisha; Miner, Alison; Steinhart, Gail

    2012-01-01

    Research libraries have sought to apply their information management expertise to the management of digital research data. This focus has been spurred in part by the policies of two major funding agencies in the United States, which require grant recipients make research outputs, including publications and research data, openly available. As many…

  6. 76 FR 16587 - Risk Management Requirements for Derivatives Clearing Organizations

    Science.gov (United States)

    2011-03-24

    ... COMMODITY FUTURES TRADING COMMISSION 17 CFR Part 39 RIN 3038-AC98 Risk Management Requirements for... other things, would implement DCO Core Principle D (Risk Management) and would establish a related... framework to reduce risk, increase transparency, and promote market integrity within the financial system...

  7. The Gift Code User Manual. Volume I. Introduction and Input Requirements

    Science.gov (United States)

    1975-07-01

    REPORT & PERIOD COVERED ‘TII~ GIFT CODE USER MANUAL; VOLUME 1. INTRODUCTION AND INPUT REQUIREMENTS FINAL 6. PERFORMING ORG. REPORT NUMBER ?. AuTHOR(#) 8...reverua side if neceaeary and identify by block number] (k St) The GIFT code is a FORTRANcomputerprogram. The basic input to the GIFT ode is data called

  8. CH2M Hill Hanford Group, Inc., Standards and Requirements Identification Document (SRID) Requirements Management System and Requirements Specification

    International Nuclear Information System (INIS)

    JOHNSON, A.L.

    2000-01-01

    The current Tank Farm Contractor (TFC) for the U. S. Department of Energy, Office of River Protection (ORP), River Protection Project (RPP), CH2M Hill Hanford Group, Inc. (CHG), will use a computer based requirements management system. The system will serve as a tool to assist in identifying, capturing, and maintaining the Standards/Requirements Identification Document (S/RID) requirements and links to implementing procedures and other documents. By managing requirements as one integrated set, CHG will be able to carry out its mission more efficiently and effectively. CHG has chosen the Dynamic Object Oriented Requirements System (DOORS(trademark)) as the preferred computer based requirements management system. Accordingly, the S/RID program will use DOORS(trademark). DOORS(trademark) will replace the Environmental Requirements Management Interface (ERMI) system as the tool for S/RID data management. The DOORS(trademark) S/RID test project currently resides on the DOORSTM test server. The S/RID project will be migrated to the DOORS(trademark) production server. After the migration the S/RID project will be considered a production project and will no longer reside on the test server

  9. 7 CFR 3015.169 - Equipment management requirements.

    Science.gov (United States)

    2010-01-01

    ... following requirements (including replacement equipment) until such actions as transfer, replacement or... transfer, replacement, or disposal of the equipment. (b) Every two years, at a minimum, a physical... 7 Agriculture 15 2010-01-01 2010-01-01 false Equipment management requirements. 3015.169 Section...

  10. Information management system study results. Volume 1: IMS study results

    Science.gov (United States)

    1971-01-01

    The information management system (IMS) special emphasis task was performed as an adjunct to the modular space station study, with the objective of providing extended depth of analysis and design in selected key areas of the information management system. Specific objectives included: (1) in-depth studies of IMS requirements and design approaches; (2) design and fabricate breadboard hardware for demonstration and verification of design concepts; (3) provide a technological base to identify potential design problems and influence long range planning (4) develop hardware and techniques to permit long duration, low cost, manned space operations; (5) support SR&T areas where techniques or equipment are considered inadequate; and (6) permit an overall understanding of the IMS as an integrated component of the space station.

  11. System requirements and design description for the environmental requirements management interface (ERMI)

    International Nuclear Information System (INIS)

    Biebesheimer, E.

    1997-01-01

    This document describes system requirements and the design description for the Environmental Requirements Management Interface (ERMI). The ERMI database assists Tank Farm personnel with scheduling, planning, and documenting procedure compliance, performance verification, and selected corrective action tracking activities for Tank Farm S/RID requirements. The ERMI database was developed by Science Applications International Corporation (SAIC). This document was prepared by SAIC and edited by LMHC

  12. Requirements Development Issues for Advanced Life Support Systems: Solid Waste Management

    Science.gov (United States)

    Levri, Julie A.; Fisher, John W.; Alazraki, Michael P.; Hogan, John A.

    2002-01-01

    Long duration missions pose substantial new challenges for solid waste management in Advanced Life Support (ALS) systems. These possibly include storing large volumes of waste material in a safe manner, rendering wastes stable or sterilized for extended periods of time, and/or processing wastes for recovery of vital resources. This is further complicated because future missions remain ill-defined with respect to waste stream quantity, composition and generation schedule. Without definitive knowledge of this information, development of requirements is hampered. Additionally, even if waste streams were well characterized, other operational and processing needs require clarification (e.g. resource recovery requirements, planetary protection constraints). Therefore, the development of solid waste management (SWM) subsystem requirements for long duration space missions is an inherently uncertain, complex and iterative process. The intent of this paper is to address some of the difficulties in writing requirements for missions that are not completely defined. This paper discusses an approach and motivation for ALS SWM requirements development, the characteristics of effective requirements, and the presence of those characteristics in requirements that are developed for uncertain missions. Associated drivers for life support system technological capability are also presented. A general means of requirements forecasting is discussed, including successive modification of requirements and the need to consider requirements integration among subsystems.

  13. Establishing functional requirements for emergency management information systems

    Energy Technology Data Exchange (ETDEWEB)

    Reed, J.H.; Rogers, G.O.; Sorensen, J.H.

    1991-01-01

    The advancement of computer technologies has led to the development of a number of emergency management information systems (e.g., EIS, CAMEO, IEMIS). The design of these systems has tended to be technologically driven rather than oriented to meeting information management needs during an emergency. Of course, emergency management needs vary depending on the characteristics of the emergency. For example, in hurricanes, onset is typically slow enough to allow emergency managers to simulate evacuations dynamically while in chemical disasters onset may be sufficiently rapid to preclude such simulation(s). This paper describes a system design process in which the analysis of widely recognized emergency management functions was used to identify information requirements and the requisite software and hardware capabilities to deal with rapid onset, low probability, high consequence events. These requirements were then implemented as a prototype emergency management system using existing hardware and software to assure feasibility. Data, hardware, and software requirements were further developed, refined, and made more concrete through an iterative prototyping effort. This approach focuses attention directly on meeting emergency management information needs while avoiding unneeded technological innovations. 10 refs., 4 figs., 1 tab.

  14. Investigation on regulatory requirements for radiation safety management

    International Nuclear Information System (INIS)

    Han, Eun Ok; Choi, Yoon Seok; Cho, Dae Hyung

    2013-01-01

    NRC recognizes that efficient management of radiation safety plan is an important factor to achieve radiation safety service. In case of Korea, the contents to perform the actual radiation safety management are legally contained in radiation safety management reports based on the Nuclear Safety Act. It is to prioritize the importance of safety regulations in each sector in accordance with the current situation of radiation and radioactive isotopes-used industry and to provide a basis for deriving safety requirements and safety regulations system maintenance by the priority of radiation safety management regulations. It would be helpful to achieve regulations to conform to reality based on international standards if consistent safety requirements is developed for domestic users, national standards and international standards on the basis of the results of questions answered by radiation safety managers, who lead on-site radiation safety management, about the priority of important factors in radioactive sources use, sales, production, moving user companies, to check whether derived configuration requirements for radiation safety management are suitable for domestic status

  15. Application of Total Quality Management (TQM Requirements in Risk Management in Construction Projects in Iraq

    Directory of Open Access Journals (Sweden)

    Entisar K. Al-Geelawee

    2016-06-01

    Full Text Available Total quality management considers one of the modern scientific entrances which practiced by productivity service organizations alike to provide appropriate quality required outputs according to the needs and desires of customers manage , enable the organization seeking to continue and grow in light of the increasing competition from the satisfy and provide the appropriate total quality management requirements whenever led to face risks that they may have in a manner in which they can be addressed and find ways to avoid them in the future when repeated. The research has consist of two main parts firstly have included a review of the most important concepts of total quality management in addition to the concept of risk analysis and management in construction projects and how to apply the concept of total quality management in the risk analysis and management. Second part included the practical part of the research, which was open and closed questionnaire for experts in the construction industry to obtain required informations for the application of total quality management requirements in risk management in construction projects in Iraq. One of the main findings of the research is that top management support has a high impact on risk management in addition to continuous improvement, training and education, while the participation of all employees in the organization and constant stimulation and focusing on the customer as one of the total quality management requirements had a moderate impact on risk management.

  16. Understanding the heterogeneity in volume overload and fluid distribution in decompensated heart failure is key to optimal volume management: role for blood volume quantitation.

    Science.gov (United States)

    Miller, Wayne L; Mullan, Brian P

    2014-06-01

    This study sought to quantitate total blood volume (TBV) in patients hospitalized for decompensated chronic heart failure (DCHF) and to determine the extent of volume overload, and the magnitude and distribution of blood volume and body water changes following diuretic therapy. The accurate assessment and management of volume overload in patients with DCHF remains problematic. TBV was measured by a radiolabeled-albumin dilution technique with intravascular volume, pre-to-post-diuretic therapy, evaluated at hospital admission and at discharge. Change in body weight in relation to quantitated TBV was used to determine interstitial volume contribution to total fluid loss. Twenty-six patients were prospectively evaluated. Two patients had normal TBV at admission. Twenty-four patients were hypervolemic with TBV (7.4 ± 1.6 liters) increased by +39 ± 22% (range, +9.5% to +107%) above the expected normal volume. With diuresis, TBV decreased marginally (+30 ± 16%). Body weight declined by 6.9 ± 5.2 kg, and fluid intake/fluid output was a net negative 8.4 ± 5.2 liters. Interstitial compartment fluid loss was calculated at 6.2 ± 4.0 liters, accounting for 85 ± 15% of the total fluid reduction. TBV analysis demonstrated a wide range in the extent of intravascular overload. Dismissal measurements revealed marginally reduced intravascular volume post-diuretic therapy despite large reductions in body weight. Mobilization of interstitial fluid to the intravascular compartment with diuresis accounted for this disparity. Intravascular volume, however, remained increased at dismissal. The extent, composition, and distribution of volume overload are highly variable in DCHF, and this variability needs to be taken into account in the approach to individualized therapy. TBV quantitation, particularly serial measurements, can facilitate informed volume management with respect to a goal of treating to euvolemia. Copyright © 2014 American College of Cardiology Foundation. Published

  17. Management and technical requirements for laboratories in charge of water monitoring

    International Nuclear Information System (INIS)

    Ottaviani, M.; Bonadonna, L.; Lucentini, L.; Pettine, P.

    2008-01-01

    This report completes the series of volumes focused on microbiological (Rapporti ISTISAN 07/5) and chemical methods (Rapporti ISTISAN 07/31) for the monitoring of water intended for human consumption according to the Italian Legislative Decree 31/2001 (transposition of European Directive 98/83/EC) and its integrations. The guidelines here presented concern management and technical requirements for laboratories in charge of testing parameters required by the Decree also taking into account the criteria stated by the standard UNI CEI EN ISO/IEC 17025 [it

  18. Balancing requirements for radioactive waste management and radiation protection

    International Nuclear Information System (INIS)

    Lafuma, J.; Lefevre, J.

    1985-01-01

    The authors recall the principles of radiation protection and their application to radioactive waste management. The dose limitation system applies to every stage in management. The accepted risk limits should be compared with the level of risk from other sources, particularly from natural radiation. The uncertainties associated with long-term estimates should not lead to unrealistic requirements. The optimum rules are to be obtained by discussion among those responsible for radiation protection, nuclear safety and radioactive waste management. Satisfactory, applicable rules can be worked out in the present state of the art [fr

  19. Identifying and Managing Engineering Design Requirements for Emerging Markets

    DEFF Research Database (Denmark)

    Li, Xuemeng

    , especially for those companies originally from developed markets, to acquire an in-depth understanding of particular design requirements in emerging markets in order to adapt both company products and approaches in such contexts. Prior studies on the identification and management of design requirements have...... predominantly been conducted in the context of developed countries and relatively affluent markets. Emerging markets are distinct from developed markets in terms of numerous contextual factors, e.g., regulatory environments and competitive landscapes. These factors influence the requirement identification...... attention. There is a need for an overview of different perspectives in requirement identification for manufacturing companies and their corresponding assessments in the context of emerging markets. Therefore, this research project is motivated to 1) investigate the process of identifying and managing...

  20. Managing today's complex healthcare business enterprise: reflections on distinctive requirements of healthcare management education.

    Science.gov (United States)

    Welton, William E

    2004-01-01

    In early 2001, the community of educational programs offering master's-level education in healthcare management began an odyssey to modernize its approach to the organization and delivery of healthcare management education. The community recognized that cumulative long-term changes within healthcare management practice required a careful examination of healthcare management context and manpower requirements. This article suggests an evidence-based rationale for defining the distinctive elements of healthcare management, thus suggesting a basis for review and transformation of master's-level healthcare management curricula. It also suggests ways to modernize these curricula in a manner that recognizes the distinctiveness of the healthcare business enterprise as well as the changing management roles and careers within these complex organizations and systems. Through such efforts, the healthcare management master's-level education community would be better prepared to meet current and future challenges, to increase its relevance to the management practice community, and to allocate scarce faculty and program resources more effectively.

  1. TRADE instructional materials for SARA/OSHA training. Volume 2, Managers and supervisors training

    Energy Technology Data Exchange (ETDEWEB)

    1989-03-01

    This document provides instructional materials for an eight-hour training course for managers and supervisors of hazardous waste sites. It is one of three volumes of course materials TRADE is preparing to help DOE contractor training staff comply with 29 CFR 1910.120, the Occupational Health and Safety Administration (OSHA) rule that implements Title I of the Superfund Amendments and Reauthorization Act (SARA) of 1986. OSHA`s final rule for hazardous waste operators was published in the Federal Register of March 6, 1989 (54 FR 9294). Combined with the materials in Volumes I and III and with appropriate site-specific information, these materials will help DOE contractors to meet the requirements of 1910.120 (e) that ``on-site management and supervisors directly responsible for, or who supervise employees engaged in, hazardous waste operations`` receive the same initial training as that of the employees they supervise and at least eight additional hours of specialized training in managing hazardous waste operations.

  2. User Requirements Model for University Timetable Management System

    OpenAIRE

    Ahmad Althunibat; Mohammad I. Muhairat

    2016-01-01

    Automated timetables are used to schedule courses, lectures and rooms in universities by considering some constraints. Inconvenient and ineffective timetables often waste time and money. Therefore, it is important to investigate the requirements and potential needs of users. Thus, eliciting user requirements of University Timetable Management System (TMS) and their implication becomes an important process for the implementation of TMS. On this note, this paper seeks to propose a m...

  3. Department of Defense Financial Management Regulation. Volume 13. Nonappropriated Funds Policy and Procedures

    National Research Council Canada - National Science Library

    1994-01-01

    .... In addition, it directs statutory and regulatory financial reporting requirements. This Volume prescribes standard accounting principles and practices for all DoD nonappropriated fund instrumentalities (NAFIs...

  4. High-level waste storage tank farms/242-A evaporator Standards/Requirements Identification Document (S/RID), Volume 5

    International Nuclear Information System (INIS)

    1994-04-01

    The High-Level Waste Storage Tank Farms/242-A Evaporator Standards/Requirements Identification Document (S/RID) is contained in multiple volumes. This document (Volume 5) outlines the standards and requirements for the Fire Protection and Packaging and Transportation sections

  5. High-level waste storage tank farms/242-A evaporator Standards/Requirements Identification Document (S/RID), Volume 4

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    The High-Level Waste Storage Tank Farms/242-A Evaporator Standards/Requirements Identification Document (S/RID) is contained in multiple volumes. This document (Volume 4) presents the standards and requirements for the following sections: Radiation Protection and Operations.

  6. High-level waste storage tank farms/242-A evaporator Standards/Requirements Identification Document (S/RID), Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    The High-Level Waste Storage Tank Farms/242-A Evaporator Standards/Requirements Document (S/RID) is contained in multiple volumes. This document (Volume 2) presents the standards and requirements for the following sections: Quality Assurance, Training and Qualification, Emergency Planning and Preparedness, and Construction.

  7. High-level waste storage tank farms/242-A evaporator Standards/Requirements Identification Document (S/RID), Volume 2

    International Nuclear Information System (INIS)

    1994-04-01

    The High-Level Waste Storage Tank Farms/242-A Evaporator Standards/Requirements Document (S/RID) is contained in multiple volumes. This document (Volume 2) presents the standards and requirements for the following sections: Quality Assurance, Training and Qualification, Emergency Planning and Preparedness, and Construction

  8. High-level waste storage tank farms/242-A evaporator Standards/Requirements Identification Document (S/RID), Volume 4

    International Nuclear Information System (INIS)

    1994-04-01

    The High-Level Waste Storage Tank Farms/242-A Evaporator Standards/Requirements Identification Document (S/RID) is contained in multiple volumes. This document (Volume 4) presents the standards and requirements for the following sections: Radiation Protection and Operations

  9. Application of Total Quality Management (TQM) Requirements in Risk Management in Construction Projects in Iraq

    OpenAIRE

    Entisar K. Al-Geelawee; Anfal Nadhel Mohammed

    2016-01-01

    Total quality management considers one of the modern scientific entrances which practiced by productivity service organizations alike to provide appropriate quality required outputs according to the needs and desires of customers manage , enable the organization seeking to continue and grow in light of the increasing competition from the satisfy and provide the appropriate total quality management requirements whenever led to face risks that they may have in a manner in which they can be a...

  10. Requirements engineering for trust management: Model, methodology, and reasoning

    NARCIS (Netherlands)

    Giorgini, P.; Massacci, F.; Mylopoulos, J.; Zannone, N.

    2006-01-01

    A number of recent proposals aim to incorporate security engineering into mainstream software engineering. Yet, capturing trust and security requirements at an organizational level, as opposed to an IT system level, and mapping these into security and trust management policies is still an open

  11. Requirements for VICTORIA Class Fire Control System: Contact Management Function

    Science.gov (United States)

    2014-07-01

    Requirements for VICTORIA Class Fire Control System Contact Management Function Tab Lamoureux CAE Integrated Enterprise Solutions...Contract Report DRDC-RDDC-2014-C190 July 2014 © Her Majesty the Queen in Right of Canada, as represented by the...i Abstract …….. The VICTORIA Class Submarines (VCS) are subject to a continuing program of technical upgrades. One such program is

  12. 77 FR 12754 - Contractor Legal Management Requirements; Acquisition Regulations

    Science.gov (United States)

    2012-03-02

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 Parts 931, 952 and 970 RIN 1990-AA37 Contractor Legal... rulemaking (NOPR) to revise existing regulations covering contractor legal management requirements and make... relating to the DOE notice of proposed rulemaking to revise existing regulations covering contractor legal...

  13. Recent developments and trends in requirements management systems

    International Nuclear Information System (INIS)

    Suzuki, Satoru; Ueda, Hiroyoshi; Fujisaki, Kiyoshi; Ishiguro, Katsuhiko; Tsuchi, Hiroyuki; Vomvoris, Stratis; Gaus, Irina

    2011-01-01

    In a recent international meeting, five radioactive waste disposal organizations (NUMO/Japan; NAGRA/Switzerland; ONDRAF/NIRAS/Belgium; POSIVA/Finland; SKB/Sweden) have discussed the status and developments of RMS in their respective programs. The majority have already implemented an IT-based system, or, are testing and developing such systems. The level of detail of requirements depends on the stage of the program. Those approaching the license application have integrated all components of the repository concept, including the processes for the operational phase. Requirements management is closely associated with the quality management system. Combining requirement and decision-tracking has been expressed as an explicit goal for some programs. Caution was expressed regarding the expectations for the RMS being developed. There is a risk that such systems are perceived as expert systems that can derive decisions, which then will be unquestionably accepted. It is nevertheless recognized that they can be of great help in communicating with the various stakeholders and with relative ease demonstrate how their requirements have been considered and satisfied with the proposed repository systems. Further efforts need to be undertaken to integrate the requirement management systems, and the processes that they represent, in the day-to-day operations of the organizations. First positive experiences of the latter are reported. (author)

  14. MORE: Management of Requirements in NPP Modernisation Projects, final report

    International Nuclear Information System (INIS)

    Fredriksen, R.; Katta, V.; Raspotnig, C.; Valkonen, J.

    2008-09-01

    This report documents the work and related activities of the MORE (Management of Requirements in NPP Modernisation Projects) (NKS-R project number NKS-R-2005-47) project. This report also provides a summary of the project activities and deliverables, and discusses possible application areas. The project has aimed at the industrial utilisation of the results from the TACO: (Traceability and Communication of Requirements in Digital I and C Systems Development) (NKS-R project number NKS-R-2002-16, completed June, 2005) project, and practical application of improved approaches and methods for requirements engineering and change management. Finally, the report provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  15. MORE: Management of Requirements in NPP Modernisation Projects, final report

    Energy Technology Data Exchange (ETDEWEB)

    Fredriksen, R.; Katta, V.; Raspotnig, C. (Inst. for energiteknikk (IFE) (Norway)); Valkonen, J. (Technical Research Centre of Finland (VTT) (Finland))

    2008-09-15

    This report documents the work and related activities of the MORE (Management of Requirements in NPP Modernisation Projects) (NKS-R project number NKS-R-2005-47) project. This report also provides a summary of the project activities and deliverables, and discusses possible application areas. The project has aimed at the industrial utilisation of the results from the TACO: (Traceability and Communication of Requirements in Digital I and C Systems Development) (NKS-R project number NKS-R-2002-16, completed June, 2005) project, and practical application of improved approaches and methods for requirements engineering and change management. Finally, the report provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (author)

  16. Information technology - Security techniques - Information security management systems - Requirements

    CERN Document Server

    International Organization for Standardization. Geneva

    2005-01-01

    ISO/IEC 27001:2005 covers all types of organizations (e.g. commercial enterprises, government agencies, not-for profit organizations). ISO/IEC 27001:2005 specifies the requirements for establishing, implementing, operating, monitoring, reviewing, maintaining and improving a documented Information Security Management System within the context of the organization's overall business risks. It specifies requirements for the implementation of security controls customized to the needs of individual organizations or parts thereof. ISO/IEC 27001:2005 is designed to ensure the selection of adequate and proportionate security controls that protect information assets and give confidence to interested parties. ISO/IEC 27001:2005 is intended to be suitable for several different types of use, including the following: use within organizations to formulate security requirements and objectives; use within organizations as a way to ensure that security risks are cost effectively managed; use within organizations to ensure comp...

  17. Design requirements for SRB production control system. Volume 3: Package evaluation, modification and hardware

    Science.gov (United States)

    1981-01-01

    The software package evaluation was designed to analyze commercially available, field-proven, production control or manufacturing resource planning management technology and software package. The analysis was conducted by comparing SRB production control software requirements and conceptual system design to software package capabilities. The methodology of evaluation and the findings at each stage of evaluation are described. Topics covered include: vendor listing; request for information (RFI) document; RFI response rate and quality; RFI evaluation process; and capabilities versus requirements.

  18. The Use of UML for Software Requirements Expression and Management

    Science.gov (United States)

    Murray, Alex; Clark, Ken

    2015-01-01

    It is common practice to write English-language "shall" statements to embody detailed software requirements in aerospace software applications. This paper explores the use of the UML language as a replacement for the English language for this purpose. Among the advantages offered by the Unified Modeling Language (UML) is a high degree of clarity and precision in the expression of domain concepts as well as architecture and design. Can this quality of UML be exploited for the definition of software requirements? While expressing logical behavior, interface characteristics, timeliness constraints, and other constraints on software using UML is commonly done and relatively straight-forward, achieving the additional aspects of the expression and management of software requirements that stakeholders expect, especially traceability, is far less so. These other characteristics, concerned with auditing and quality control, include the ability to trace a requirement to a parent requirement (which may well be an English "shall" statement), to trace a requirement to verification activities or scenarios which verify that requirement, and to trace a requirement to elements of the software design which implement that requirement. UML Use Cases, designed for capturing requirements, have not always been satisfactory. Some applications of them simply use the Use Case model element as a repository for English requirement statements. Other applications of Use Cases, in which Use Cases are incorporated into behavioral diagrams that successfully communicate the behaviors and constraints required of the software, do indeed take advantage of UML's clarity, but not in ways that support the traceability features mentioned above. Our approach uses the Stereotype construct of UML to precisely identify elements of UML constructs, especially behaviors such as State Machines and Activities, as requirements, and also to achieve the necessary mapping capabilities. We describe this approach in the

  19. GENERAL REQUIREMENTS FOR SIMULATION MODELS IN WASTE MANAGEMENT

    International Nuclear Information System (INIS)

    Miller, Ian; Kossik, Rick; Voss, Charlie

    2003-01-01

    Most waste management activities are decided upon and carried out in a public or semi-public arena, typically involving the waste management organization, one or more regulators, and often other stakeholders and members of the public. In these environments, simulation modeling can be a powerful tool in reaching a consensus on the best path forward, but only if the models that are developed are understood and accepted by all of the parties involved. These requirements for understanding and acceptance of the models constrain the appropriate software and model development procedures that are employed. This paper discusses requirements for both simulation software and for the models that are developed using the software. Requirements for the software include transparency, accessibility, flexibility, extensibility, quality assurance, ability to do discrete and/or continuous simulation, and efficiency. Requirements for the models that are developed include traceability, transparency, credibility/validity, and quality control. The paper discusses these requirements with specific reference to the requirements for performance assessment models that are used for predicting the long-term safety of waste disposal facilities, such as the proposed Yucca Mountain repository

  20. Guidance and Control Software Project Data - Volume 4: Configuration Management and Quality Assurance Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes configuration management and quality assurance documents from the GCS project. Volume 4 contains six appendices: A. Software Accomplishment Summary for the Guidance and Control Software Project; B. Software Configuration Index for the Guidance and Control Software Project; C. Configuration Management Records for the Guidance and Control Software Project; D. Software Quality Assurance Records for the Guidance and Control Software Project; E. Problem Report for the Pluto Implementation of the Guidance and Control Software Project; and F. Support Documentation Change Reports for the Guidance and Control Software Project.

  1. Identification and Comparison of Requirements Placed on Brand Managers

    Directory of Open Access Journals (Sweden)

    Zuzana Wroblowská

    2016-09-01

    Full Text Available The purpose of the article: Building a strong brand is difficult, even when viewing brands as an essential asset of the company is a lasting trend. So for brand managers to succeed in their job roles, they must possess knowledge, skills, and relevant personality traits. The purpose of the author’s work was to provide the insight into the offering of brand manager’s posts in the Czech Republic and to analyze the collected data with the special interest in finding the answer, whether the employers see a brand manager as a knowledge worker. Methodology/methods: For a successful empirical research, the content analysis method by Berelson was used to study the texts in recruitment advertisements. The statistical verification of results was conducted using the chi-squared test. Scientific aim: The goal of the primary survey was to provide answers to the research questions, which arise from the following research assumption: (1 the set of requirements for candidates for the job of Brand Manager will confirm that a brand manager is one of the workers who have skills and personality prerequisites expected for knowledge workers and (2 after the period of economic recession and despite the oncoming recovery, employers do not concede their requirements placed on candidates for the job of Brand Manager. Findings: The results of the actual research project confirmed a fundamental need of excellent communication skills (69.6%, a high degree of creativity (51.8% and analytical ability (42.9% of candidates for the position “Brand Manager”. During the comparison of the data results gathered in 2007 there were recorded some differences. Statistical verification confirmed the shift of requirements in the group of traits and skills connected to motivation and self-control. The results also showed significant differences in the analysed group of ads for the position of “Brand Manager” and “Product Manager” in almost all groups of psychological

  2. Optimized waste management: Less volume and less radiotoxicity

    International Nuclear Information System (INIS)

    Fournier, Ph.; Nigon, J.L.

    2001-01-01

    This paper describes efforts to optimize fuel cycle back end solid wastes, in order to reduce both volume and radioactivity of final residues. An integrated strategy of standardized conditioning of all residues from reprocessing, called the Universal Canister Strategy, has been adopted. The application of feedback from over 30 years of operating experience and research and development to minimization of waste volume and radioactivity is presented. (author)

  3. A SUSTAINABLE HEALTH CARE SYSTEM REQUIRES MANAGEMENT TRANSFORMATION

    Directory of Open Access Journals (Sweden)

    Kanellopoulos Dimitros

    2011-12-01

    Full Text Available In order to be the health care system sustainable , management transformations must be based on very precise diagnostic analysis that includes complete and current information. It is necessary to implement an information system that collects information in real time, that watches the parameters that significantly influence the sustainability of the system. Such an information system should point out a radiography(a scan of the system at some time under following aspects:: 1. An overview of system; 2 An overview of the economic situation; 3 A technical presentation ;4. A legal overview; 5. A social overview ; 6. A management overview .Based on these Xrays of the health system, it outlines a series of conclusions and recommendations together with a SWOT analysis that highlights the potential internal (strengths and weaknesses and external potential (opportunities and threats. Based on this analysis and recommendations, the management is going to redesign the system in order to be adapted to the changing environmental requirements. Management transformation is recommended to be by following steps. :1. The development of a new management system that would make a positive change in the health care system 2. Implementation of the new management system 3. Assessment of the changes

  4. 76 FR 58543 - Draft Policy Statement on Volume Reduction and Low-Level Radioactive Waste Management

    Science.gov (United States)

    2011-09-21

    ...-Level Radioactive Waste Management AGENCY: Nuclear Regulatory Commission. ACTION: Reopening of comment... for public comment a draft Policy Statement on Volume Reduction and Low-Level Radioactive Waste...-based approaches to managing waste are also needed to safely manage Low-Level Radioactive Waste. The...

  5. [Requirements for the successful installation of an data management system].

    Science.gov (United States)

    Benson, M; Junger, A; Quinzio, L; Hempelmann, G

    2002-08-01

    Due to increasing requirements on medical documentation, especially with reference to the German Social Law binding towards quality management and introducing a new billing system (DRGs), an increasing number of departments consider to implement a patient data management system (PDMS). The installation should be professionally planned as a project in order to insure and complete a successful installation. The following aspects are essential: composition of the project group, definition of goals, finance, networking, space considerations, hardware, software, configuration, education and support. Project and finance planning must be prepared before beginning the project and the project process must be constantly evaluated. In selecting the software, certain characteristics should be considered: use of standards, configurability, intercommunicability and modularity. Our experience has taught us that vaguely defined goals, insufficient project planning and the existing management culture are responsible for the failure of PDMS installations. The software used tends to play a less important role.

  6. A governor's guide to emergency management. Volume one, Natural disasters

    Science.gov (United States)

    2001-02-27

    With lives, infrastructure, and resources at stake, governors must become instant experts in emergency management when their states are affected by natural disaster. The purpose of A Governor's Guide to Emergency Management is to provide governors an...

  7. ATTACK WARNING: Better Management Required to Resolve NORAD Integration Deficiencies

    Science.gov (United States)

    1989-07-01

    protocols, Cumbersome Integration different manufacturers’ computer systems can communicate with eachother . The warning and assessment subsystems...by treating TW/AA system as a single system subject to program review and oversight by the Defense Acquisition Board. Within this management...restore the unit to operation quickly enough after a power loss to meet NORAD mis- sion requirements. The Air Force intends to have the contractor

  8. An ontological framework for requirement change management in distributed environment

    International Nuclear Information System (INIS)

    Khatoon, A.; Hafeez, Y.; Ali, T.

    2014-01-01

    Global Software Development (GSD) is getting fame in the software industry gradually. However, in GSD, multiple and diverse stakeholders are involved in the development of complex software systems. GSD introduces several challenges, i.e. physical distance, time zone, culture difference, language barriers. As requirements play a significant role in any software development. The greatest challenge in GSD environment is to maintain a consistent view of the system even if the requirements change. But at the same time single change in the requirement might affect several other modules. In GSD different people use terms and have different ways of expressing the concepts for which people at remote sites are unable to get uniformity regarding the semantics of the terms. In a global environment requires effective communication and coordination. However, to overcome inconsistencies and ambiguities among the team members and to make the team members aware of the consistent view, a shared and common understanding is required. In this paper an approach beneficial to software industry has been proposed, focusing on changing requirements in a Global Software Development environment. A case study has been used for the evaluation of the proposed approach. Therefore, Requirements change management process has been improved by applying the approach of the case study. The proposed approach is beneficial to the software development organizations where frequent changes occur. It guided the software industry to provide the common understandings to all the development teams residing in remote locations. (author)

  9. Technical considerations and policy requirements for plutonium management

    International Nuclear Information System (INIS)

    Christensen, D.C.; Dinehart, S.M.; Yarbro, S.L.

    1995-01-01

    The goals for plutonium management have changed dramatically over the past few years. Today, the challenge is focused on isolating plutonium from the environment and preparing it for permanent disposition. In parallel, the requirements for managing plutonium are rapidly changing. For example, there is a significant increase in public awareness on how facilities operate, increased attention to environmental safety and health (ES and H) concerns, greater interest in minimizing waste, more emphasis on protecting material from theft, providing materials for international inspection, and a resurgence of interest in using plutonium as an energy source. Of highest concern, in the immediate future, is protecting plutonium from theft or diversion, while the national policy on disposition is debated. These expanded requirements are causing a broadening of responsibilities within the Department of Energy (DOE) to include at least seven organizations. An unavoidable consequence is the divergence in approach and short-term goals for managing similar materials within each organization. The technology base does exist, properly, safely, and cost effectively to extract plutonium from excess weapons, residues, waste, and contaminated equipment and facilities, and to properly stabilize it. Extracting the plutonium enables it to be easily inventoried, packaged, and managed to minimize the risk of theft and diversion. Discarding excess plutonium does not sufficiently reduce the risk of diversion, and as a result, long-term containment of plutonium from the environment may not be able to be proven to the satisfaction of the public

  10. Technical considerations and policy requirements for plutonium management

    International Nuclear Information System (INIS)

    Christensen, D.C.; Dinehart, S.M.; Yarbro, S.L.

    1996-01-01

    The goals for plutonium management have changed dramatically over the past few years. Today, the challenge is focused on isolating plutonium from the environment and preparing it for permanent disposition. In parallel, the requirements for managing plutonium are rapidly changing. For example, there is a significant increase in public awareness on how facilities operate, increased attention to environmental safety and health (ES and H) concerns, greater interest in minimizing waste, more emphasis on protecting material from theft, providing materials for international inspection, and a resurgence of interest in using plutonium as an energy source. Of highest concern, in the immediate future, is protecting plutonium from theft or diversion, while the national policy on disposition is debated. These expanded requirements are causing a broadening of responsibilities within the Department of Energy (DOE) to include at least seven organizations. An unavoidable consequence is the divergence in approach and short-term goals for managing similar materials within each organization. The technology base does exist, properly, safely, and cost effectively to extract plutonium from excess weapons, residues, waste, and contaminated equipment and facilities, and to properly stabilize it. Extracting the plutonium enables it to be easily inventoried, packaged, and managed to minimize the risk of theft and diversion. Discarding excess plutonium does not sufficient reduce the risk of diversion, and as a result, long-term containment of plutonium from the environment may not be able to be proven to the satisfaction of the public

  11. Impact of an electronic health record operating room management system in ophthalmology on documentation time, surgical volume, and staffing.

    Science.gov (United States)

    Sanders, David S; Read-Brown, Sarah; Tu, Daniel C; Lambert, William E; Choi, Dongseok; Almario, Bella M; Yackel, Thomas R; Brown, Anna S; Chiang, Michael F

    2014-05-01

    Although electronic health record (EHR) systems have potential benefits, such as improved safety and quality of care, most ophthalmology practices in the United States have not adopted these systems. Concerns persist regarding potential negative impacts on clinical workflow. In particular, the impact of EHR operating room (OR) management systems on clinical efficiency in the ophthalmic surgery setting is unknown. To determine the impact of an EHR OR management system on intraoperative nursing documentation time, surgical volume, and staffing requirements. For documentation time and circulating nurses per procedure, a prospective cohort design was used between January 10, 2012, and January 10, 2013. For surgical volume and overall staffing requirements, a case series design was used between January 29, 2011, and January 28, 2013. This study involved ophthalmic OR nurses (n = 13) and surgeons (n = 25) at an academic medical center. Electronic health record OR management system implementation. (1) Documentation time (percentage of operating time documenting [POTD], absolute documentation time in minutes), (2) surgical volume (procedures/time), and (3) staffing requirements (full-time equivalents, circulating nurses/procedure). Outcomes were measured during a baseline period when paper documentation was used and during the early (first 3 months) and late (4-12 months) periods after EHR implementation. There was a worsening in total POTD in the early EHR period (83%) vs paper baseline (41%) (P system implementation was associated with worsening of intraoperative nursing documentation time especially in shorter procedures. However, it is possible to implement an EHR OR management system without serious negative impacts on surgical volume and staffing requirements.

  12. Environmental management requirements/defensible costs project. Final report

    International Nuclear Information System (INIS)

    1996-02-01

    Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent open-quotes Murder Board.close quotes Direct participation of upper level management from LITCO and the DOE-Idaho Operations Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters' budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management

  13. Environmental management requirements/defensible costs project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent {open_quotes}Murder Board.{close_quotes} Direct participation of upper level management from LITCO and the DOE-Idaho Operations Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters` budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management.

  14. Small Business Management. Instructor's Manual. Volume I. Third Edition.

    Science.gov (United States)

    Jeanneau, Joseph A.; And Others

    The instructor's manual is one of four prepared as a guide in conducting a small Business Management course for American Indians to prepare them for jobs as owners/managers of their own businesses and for management positions with business owned by bonds, cooperatives, and others. The manual contains lesson plans, suggested methodologies, and…

  15. Paradise nearly Gained. Volume 1: Developing the Frontline Management Initiative.

    Science.gov (United States)

    Barratt-Pugh, Llandis; Soutar, Geoffrey N.

    The Frontline Management Initiative (FMI) provides a framework for competency-based development of frontline managers in Australian enterprises. The FMI's impact on businesses was examined in a national study that included the following activities: focus groups; a national survey of management development and targeted national survey of FMI users;…

  16. International Nuclear Management Academy Requirements for University Master’s Programmes in Nuclear Technology Management

    International Nuclear Information System (INIS)

    Grosbois, J. de; Hirose, H.; Adachi, F.; Liu, L.; Hanamitsu, K.; Kosilov, A.; Roberts, J.

    2016-01-01

    Full text: The development of any national nuclear energy programme is dependent on the successful development of qualified human resources, through a sustainable nuclear education and training programmes supported by government and industry. Among the broad range of specialists needed for the continued safe and economic utilization of nuclear technology for peaceful purposes, are a most vital component—managers. The International Nuclear Management Academy (INMA) is an IAEA facilitated collaboration framework in which universities provide master’s degree programmes focusing on the management aspect for the nuclear sector. INMA master’s programmes in Nuclear Technology Management (NTM) specify a common set of competency requirements that graduates should acquire to prepare them to become competent managers. This paper presents an overview of the INMA collaboration framework and the requirements for partner universities to implement master’s programmes in Nuclear Technology Management. (author

  17. 77 FR 25760 - Low-Level Radioactive Waste Management and Volume Reduction

    Science.gov (United States)

    2012-05-01

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0183] Low-Level Radioactive Waste Management and Volume... Radioactive Waste (LLRW) Volume Reduction (Policy Statement). This statement encouraged licensees to take..., the NRC staff issued SECY-10-0043, ``Blending of Low-Level Radioactive Waste'' (ADAMS Accession No...

  18. Feedback to Managers, Volume II: A Review and Comparison of Sixteen Multi-Rater Feedback Instruments.

    Science.gov (United States)

    Van Velsor, Ellen; Leslie, Jean Brittain

    "Feedback to Managers" is a two-volume report. Volume 2 compares 16 of the better feedback instruments available. The following are the instruments: (1) ACUMEN Group Feedback; (2) BENCHMARKS; (3) the Campbell Leadership Index; (4) COMPASS: the Managerial Practices Survey; (5) the Executive Success Profile; (6) Leader Behavior Analysis…

  19. Civilian Radioactive Waste Management System Requirements Document (CRP)

    International Nuclear Information System (INIS)

    C.A. Kouts

    2006-01-01

    The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible for design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by further

  20. The value of volume and growth measurements in timber sales management of the National Forests

    Science.gov (United States)

    Lietzke, K. R.

    1977-01-01

    This paper summarizes work performed in the estimation of gross social value of timber volume and growth rate information used in making regional harvest decisions in the National Forest System. A model was developed to permit parametric analysis. The problem is formulated as one of finding optimal inventory holding patterns. Public timber management differs from other inventory holding problems in that the inventory, itself, generates value over time in providing recreational, aesthetic and environmental goods. 'Nontimber' demand estimates are inferred from past Forest Service harvest and sales levels. The solution requires a description of the harvest rates which maintain the optimum inventory level. Gross benefits of the Landsat systems are estimated by comparison with Forest Service information gathering models. Gross annual benefits are estimated to be $5.9 million for the MSS system and $7.2 million for the TM system.

  1. Generic functional requirements for a NASA general-purpose data base management system

    Science.gov (United States)

    Lohman, G. M.

    1981-01-01

    Generic functional requirements for a general-purpose, multi-mission data base management system (DBMS) for application to remotely sensed scientific data bases are detailed. The motivation for utilizing DBMS technology in this environment is explained. The major requirements include: (1) a DBMS for scientific observational data; (2) a multi-mission capability; (3) user-friendly; (4) extensive and integrated information about data; (5) robust languages for defining data structures and formats; (6) scientific data types and structures; (7) flexible physical access mechanisms; (8) ways of representing spatial relationships; (9) a high level nonprocedural interactive query and data manipulation language; (10) data base maintenance utilities; (11) high rate input/output and large data volume storage; and adaptability to a distributed data base and/or data base machine configuration. Detailed functions are specified in a top-down hierarchic fashion. Implementation, performance, and support requirements are also given.

  2. Life Science Research Facility materials management requirements and concepts

    Science.gov (United States)

    Johnson, Catherine C.

    1986-01-01

    The Advanced Programs Office at NASA Ames Research Center has defined hypothetical experiments for a 90-day mission on Space Station to allow analysis of the materials necessary to conduct the experiments and to assess the impact on waste processing of recyclable materials and storage requirements of samples to be returned to earth for analysis as well as of nonrecyclable materials. The materials include the specimens themselves, the food, water, and gases necessary to maintain them, the expendables necessary to conduct the experiments, and the metabolic products of the specimens. This study defines the volumes, flow rates, and states of these materials. Process concepts for materials handling will include a cage cleaner, trash compactor, biological stabilizer, and various recycling devices.

  3. Competence requirements for logistics managers in the Republic of Serbia

    Directory of Open Access Journals (Sweden)

    Biljana Cvetic

    2017-09-01

    Full Text Available This paper examines the competences that the employers in the logistics and supply chain management (SCM field require most from employees in the Republic of Serbia. To reveal these competences, we conducted the study of online advertisements of logistics and SCM jobs published in the renowned national job portal Infostud. We used a deductive content analysis and related quantitative indicators to process and analyse the data. The results, among other conclusions, indicate the most required professional and fundamental competences from the logistics and supply chain managers in the Republic of Serbia. When the results of this study are compared with several earlier studies done in the US, the Great Britain and Germany, some similarities between these empirically obtained results are found. Several recommendations for educators that intend to improve study programmes and plans in the field of logistics and SCM are also offered. The results of this study can be valuable to interested educators, to individuals who are interested in logistics and supply chain career development, to human resource managers who are recruiting candidates for these jobs, and to others interested parties.

  4. Asset management for Wyoming counties : volume I, II, III.

    Science.gov (United States)

    2011-08-01

    Vol. 1: In the fall of 2003, the Wyoming Department of Transportation (WYDOT) and the Wyoming T2/LTAP Center (T2/LTAP) began planning an asset management program to assist counties impacted by oil and gas drilling with management of their road system...

  5. Nuclear power. Volume 2: nuclear power project management

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    The following topics are discussed: review of nuclear power plants; licensing procedures; safety analysis; project professional services; quality assurance and project organization; construction, scheduling and operation; construction, scheduling and operation; nuclear fuel handling and fuel management; and plant cost management. 116 references, 115 figures, 33 tables

  6. 78 FR 79455 - Information Collection; System for Award Management Registration Requirements for Prime Grant...

    Science.gov (United States)

    2013-12-30

    ...] Information Collection; System for Award Management Registration Requirements for Prime Grant Recipients.... ADDRESSES: Submit comments identified by Information Collection 3090- 0290, System for Award Management... ``Information Collection 3090-0290, System for Award Management Registration Requirements for Prime Grant...

  7. Analysis of some nuclear waste management options. Volume II. Appendices

    International Nuclear Information System (INIS)

    Berman, L.E.; Ensminger, D.A.; Giuffre, M.S.; Koplik, C.M.; Oston, S.G.; Pollak, G.D.; Ross, B.I.

    1978-01-01

    This report describes risk analyses performed on that portion of a nuclear fuel cycle which begins following solidification of high-level waste. Risks associated with handling, interim storage and transportation of the waste are assessed, as well as the long term implications of disposal in deep mined cavities. The risk is expressed in terms of expected dose to the general population and peak dose to individuals in the population. This volume consists of appendices which provide technical details of the work performed

  8. Analysis of some nuclear waste management options. Volume II. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Berman, L.E.; Ensminger, D.A.; Giuffre, M.S.; Koplik, C.M.; Oston, S.G.; Pollak, G.D.; Ross, B.I.

    1978-10-10

    This report describes risk analyses performed on that portion of a nuclear fuel cycle which begins following solidification of high-level waste. Risks associated with handling, interim storage and transportation of the waste are assessed, as well as the long term implications of disposal in deep mined cavities. The risk is expressed in terms of expected dose to the general population and peak dose to individuals in the population. This volume consists of appendices which provide technical details of the work performed.

  9. Management control and status reports documentation standard and Data Item Descriptions (DID). Volume of the information system life-cycle and documentation standards, volume 5

    Science.gov (United States)

    Callender, E. David; Steinbacher, Jody

    1989-01-01

    This is the fifth of five volumes on Information System Life-Cycle and Documentation Standards. This volume provides a well organized, easily used standard for management control and status reports used in monitoring and controlling the management, development, and assurance of informations systems and software, hardware, and operational procedures components, and related processes.

  10. DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 2

    International Nuclear Information System (INIS)

    Gerber, E.W.

    1995-10-01

    The Hanford Site Integrated Stabilization Management Plan (SISMP) was developed in support of the US Department of Energy's (DOE) Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 Integrated Program Plan (IPP). Volume 1 of the SISMP identifies the technical scope and costs associated with Hanford Site plans to resolve concerns identified in DNFSB Recommendation 94-1. Volume 2 of the SISMP provides the Resource Loaded Integrated Schedules for Spent Nuclear Fuel Project and Plutonium Finishing Plant activities identified in Volume 1 of the SISMP. Appendix A provides the schedules and progress curves related to spent nuclear fuel management. Appendix B provides the schedules and progress curves related to plutonium-bearing material management. Appendix C provides programmatic logic diagrams that were referenced in Volume 1 of the SISMP

  11. Using geospatial solutions to meet distribution integrity management requirements

    Energy Technology Data Exchange (ETDEWEB)

    McElroy, Robert A. [New Century Software, Inc., Fort Collins, CO (United States)

    2010-07-01

    In the United States, incidents on gas distribution pipelines kill on average 10 persons per year in addition to causing 40 serious injuries and millions of dollars of property damage. In order to remedy to this situation, the US Department of Transportation/Pipeline Hazardous Materials Safety Administration enacted new regulations requiring operators to develop distribution integrity management programs (DIMP) which must include: knowledge and identification of threats, evaluation of risk, identification and implementation of measures to address risks, performance measuring, periodic evaluation and improvement and results reporting. The aim of this paper is to show how geographic information systems (GIS) can help operators meet each requirement of the DIMP regulations. This discussion showed that GIS can help in identifying and quantifying the threats to the distribution system and in assessing the consequences of an incident. Investing in GIS will not only help operators in complying with the regulations but will also help them make economically sound, risk-based decisions.

  12. Adult classical homocystinuria requiring parenteral nutrition: Pitfalls and management.

    Science.gov (United States)

    Tran, Christel; Bonafé, Luisa; Nuoffer, Jean-Marc; Rieger, Julie; Berger, Mette M

    2017-07-25

    Homocystinuria due to cystathionine beta synthase (CBS) deficiency presents with a wide clinical spectrum. Treatment by the enteral route aims at reducing homocysteine levels by using vitamin B6, possibly methionine-restricted diet, betaine and/or folate and vitamin B 12 supplementation. Currently no nutritional guidelines exist regarding parenteral nutrition (PN) under acute conditions. Exhaustive literature search was performed, in order to identify the relevant studies describing the pathogenesis and nutritional intervention of adult classical homocystinuria requiring PN. Description of an illustrative case of an adult female with CBS deficiency and intestinal perforation, who required total PN due to contraindication to enteral nutrition. Nutritional management of decompensated classical homocystinuria is complex and currently no recommendation exists regarding PN composition. Amino acid profile and monitoring of total homocysteine concentration are the main tools enabling a precise assessment of the severity of metabolic alterations. In case of contraindication to enteral nutrition, compounded PN will be required, as described in this paper, to ensure adequate low amounts of methionine and others essential amino acids and avoid potentially fatal toxic hypermethioninemia. By reviewing the literature and reporting successful nutritional management of a decompensated CBS deficiency using tailored PN with limited methionine intake and n-3 PUFA addition, we would like to underscore the fact that standard PN solutions are not adapted for CBS deficient critical ill patients: new solutions are required. High methionine levels (>800 μmol/L) being potentially neurotoxic, there is an urgent need to improve our knowledge of acute nutritional therapy. Copyright © 2017 Elsevier Ltd and European Society for Clinical Nutrition and Metabolism. All rights reserved.

  13. Development of an Inline Dry Power Inhaler That Requires Low Air Volume.

    Science.gov (United States)

    Farkas, Dale; Hindle, Michael; Longest, P Worth

    2017-12-20

    Inline dry powder inhalers (DPIs) are actuated by an external air source and have distinct advantages for delivering aerosols to infants and children, and to individuals with compromised lung function or who require ventilator support. However, current inline DPIs either perform poorly, are difficult to operate, and/or require large volumes (∼1 L) of air. The objective of this study was to develop and characterize a new inline DPI for aerosolizing spray-dried formulations with powder masses of 10 mg and higher using a dispersion air volume of 10 mL per actuation that is easy to load (capsule-based) and operate. Primary features of the new low air volume (LV) DPIs are fixed hollow capillaries that both pierce the capsule and provide a continuous flow path for air and aerosol passing through the device. Two different configurations were evaluated, which were a straight-through (ST) device, with the inlet and outlet capillaries on opposite ends of the capsule, and a single-sided (SS) device, with both the inlet and outlet capillaries on the same side of the capsule. The devices were operated with five actuations of a 10 mL air syringe using an albuterol sulfate (AS) excipient-enhanced growth (EEG) formulation. Device emptying and aerosol characteristics were evaluated for multiple device outlet configurations. Each device had specific advantages. The best case ST device produced the smallest aerosol [mean mass median aerodynamic diameter (MMAD) = 1.57 μm; fine particle fraction <5 μm (FPF <5μm ) = 95.2%)] but the mean emitted dose (ED) was 61.9%. The best case SS device improved ED (84.8%), but produced a larger aerosol (MMAD = 2.13 μm; FPF <5μm  = 89.3%) that was marginally higher than the initial deaggregation target. The new LV-DPIs produced an acceptable high-quality aerosol with only 10 mL of dispersion air per actuation and were easy to load and operate. This performance should enable application in high and low flow

  14. Radioactive waste management in the former USSR. Volume 3

    Energy Technology Data Exchange (ETDEWEB)

    Bradley, D.J.

    1992-06-01

    Radioactive waste materials--and the methods being used to treat, process, store, transport, and dispose of them--have come under increased scrutiny over last decade, both nationally and internationally. Nuclear waste practices in the former Soviet Union, arguably the world`s largest nuclear waste management system, are of obvious interest and may affect practices in other countries. In addition, poor waste management practices are causing increasing technical, political, and economic problems for the Soviet Union, and this will undoubtedly influence future strategies. this report was prepared as part of a continuing effort to gain a better understanding of the radioactive waste management program in the former Soviet Union. the scope of this study covers all publicly known radioactive waste management activities in the former Soviet Union as of April 1992, and is based on a review of a wide variety of literature sources, including documents, meeting presentations, and data base searches of worldwide press releases. The study focuses primarily on nuclear waste management activities in the former Soviet Union, but relevant background information on nuclear reactors is also provided in appendixes.

  15. Financial Management Regulation. Volume 15. Security Assistance Policy and Procedures

    Science.gov (United States)

    1993-03-01

    as follows: (3). (5). (6). (7). (I). Qty, (4). SC/MOS/ Ofr Del Itm (2). Unit of Costs TA or Rel Trm Nbr Item Descriction issue (a) Unit (b) Total...the period rubber stamp or computer printing to: ended followed by an alphabetic management code assigned by SAAC. The management code 1. Notify the...EDIT DTC (1) 22 --- Validated it TBC is invalid. See TBC va’idation TYPE-ASST(1) 23 --- NO EDIT DOC- NBR -LST-8(8) 󈧜-27 --- NO EDIT DT-RQSN(4) DOC-SERIAL

  16. 77 FR 28281 - Withdrawal of Revocation of TSCA Section 4 Testing Requirements for One High Production Volume...

    Science.gov (United States)

    2012-05-14

    ... Withdrawal of Revocation of TSCA Section 4 Testing Requirements for One High Production Volume Chemical...]amino]- (CAS No. 1324-76-1), also known as C.I. Pigment Blue 61. EPA received an adverse comment regarding C.I. Pigment Blue 61. This document withdraws the revocation of testing requirements for C.I...

  17. 25 CFR 170.502 - Are management systems required for the IRR Program?

    Science.gov (United States)

    2010-04-01

    ... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge... 25 Indians 1 2010-04-01 2010-04-01 false Are management systems required for the IRR Program? 170... Program Reviews and Management Systems § 170.502 Are management systems required for the IRR Program? (a...

  18. Space shuttle program: Shuttle Avionics Integration Laboratory. Volume 7: Logistics management plan

    Science.gov (United States)

    1974-01-01

    The logistics management plan for the shuttle avionics integration laboratory defines the organization, disciplines, and methodology for managing and controlling logistics support. Those elements requiring management include maintainability and reliability, maintenance planning, support and test equipment, supply support, transportation and handling, technical data, facilities, personnel and training, funding, and management data.

  19. Radiation safety requirements for radioactive waste management in the framework of a quality management system

    International Nuclear Information System (INIS)

    Salgado, M.M.; Benitez, J.C.; Pernas, R.; Gonzalez, N.

    2007-01-01

    The Center for Radiation Protection and Hygiene (CPHR) is the institution responsible for the management of radioactive wastes generated from nuclear applications in medicine, industry and research in Cuba. Radioactive Waste Management Service is provided at a national level and it includes the collection and transportation of radioactive wastes to the Centralized Waste Management Facilities, where they are characterized, segregated, treated, conditioned and stored. A Quality Management System, according to the ISO 9001 Standard has been implemented for the RWM Service at CPHR. The Management System includes the radiation safety requirements established for RWM in national regulations and in the Licence's conditions. The role of the Regulatory Body and the Radiation Protection Officer in the Quality Management System, the authorization of practices, training and personal qualification, record keeping, inspections of the Regulatory Body and internal inspection of the Radiation Protection Officer, among other aspects, are described in this paper. The Quality Management System has shown to be an efficient tool to demonstrate that adequate measures are in place to ensure the safety in radioactive waste management activities and their continual improvement. (authors)

  20. Code of accounts. Management overview volume: Environmental restoration

    International Nuclear Information System (INIS)

    Fox, M.B.; Birkholz, H.L.

    1997-10-01

    The purpose of this procedure is to provide the requirement for assigning cost collection codes and the structure of these codes for all costs incurred for the Environmental Restoration Contract. The coding structure will be used in the budgeting and control of project costs

  1. Status of Technical Requirements Development for Maintenance Effectiveness Management

    International Nuclear Information System (INIS)

    Ahn, Sang Kyu; Kim, Yun Il; Lee, Chang Ju; Chang, Gun Hyun

    2012-01-01

    It is well known that proper maintenance at nuclear power plant is essential to plant safety and that there is a clear link between effective maintenance and safety as it relates to such factors as the number of transients and challenges to safety systems and the associated need for operability, availability, and reliability of safety equipment. Good maintenance is also important in providing assurance that failures of non-safety related structures, systems, and components (SSCs) that could initiate, adversely affect, or mitigate a transient or an accident are also minimized. Maintenance is also important to ensure that design assumptions and margins in the original design basis are maintained and are not degraded to an unacceptable level. Therefore, good maintenance practice at nuclear power plants is of utmost importance in protecting public health and safety. This paper introduces the status of the development of regulatory technical requirements (Drafts) for utility's management of maintenance effectiveness. The process of Maintenance Effectiveness Management is shown in Figure 1

  2. Final waste management programmatic environmental impact statement for managing treatment, storage, and disposl of radioactive and hazardous waste. Volume II

    International Nuclear Information System (INIS)

    1997-01-01

    The Final Waste Management Programmatic Environmental Impact Statement (WM PEIS) examines the potential environmental and cost impacts of strategic management alternatives for managing five types of radioactive and hazardous wastes that have resulted and will continue to result from nuclear defense and research activities at a variety of sites around the United States. The five waste types are low-level mixed waste, low-level waste, transuranic waste, high-level waste, and hazardous waste. The WM PEIS provides information on the impacts of various siting alternatives which the Department of Energy (DOE) will use to decide at which sites to locate additional treatment, storage, and disposal capacity for each waste type.Volume II is an integral part of the Office of Environmental Management''s (EM''s) Waste Management Programmatic Environmental Impact Statement (WM PEIS), which portrays the impacts of EM''s waste management activities at each of the 17 major DOE sites evaluated in the WM PEIS

  3. 5 CFR 9901.405 - Performance management system requirements.

    Science.gov (United States)

    2010-01-01

    ...) Holds supervisors and managers accountable for effectively managing the performance of employees under... and communicating performance expectations, monitoring performance and providing feedback, and... (b) of this section, supervisors and managers will— (1) Clearly communicate performance expectations...

  4. Measuring Blood Glucose Concentrations in Photometric Glucometers Requiring Very Small Sample Volumes.

    Science.gov (United States)

    Demitri, Nevine; Zoubir, Abdelhak M

    2017-01-01

    Glucometers present an important self-monitoring tool for diabetes patients and, therefore, must exhibit high accuracy as well as good usability features. Based on an invasive photometric measurement principle that drastically reduces the volume of the blood sample needed from the patient, we present a framework that is capable of dealing with small blood samples, while maintaining the required accuracy. The framework consists of two major parts: 1) image segmentation; and 2) convergence detection. Step 1 is based on iterative mode-seeking methods to estimate the intensity value of the region of interest. We present several variations of these methods and give theoretical proofs of their convergence. Our approach is able to deal with changes in the number and position of clusters without any prior knowledge. Furthermore, we propose a method based on sparse approximation to decrease the computational load, while maintaining accuracy. Step 2 is achieved by employing temporal tracking and prediction, herewith decreasing the measurement time, and, thus, improving usability. Our framework is tested on several real datasets with different characteristics. We show that we are able to estimate the underlying glucose concentration from much smaller blood samples than is currently state of the art with sufficient accuracy according to the most recent ISO standards and reduce measurement time significantly compared to state-of-the-art methods.

  5. GRANT FINANCIAL SYSTEM REQUIREMENTS; Checklist for Reviewing Systems Under the Federal Financial Management Improvement Act

    National Research Council Canada - National Science Library

    2001-01-01

    ...) of 1996, issued September 9, 1997. JFMIP intends for the requirements to promote understanding of key financial management systems concepts and requirements, to provide a framework for establishing integrated financial management...

  6. 23 CFR 972.204 - Management systems requirements.

    Science.gov (United States)

    2010-04-01

    ... to operate and maintain the management systems and their associated databases; and (5) A process for... analyses and coordination of all management system outputs to systematically operate, maintain, and upgrade...) The management systems shall be operated so investment decisions based on management system outputs...

  7. An Analytical Study of Mammalian Bite Wounds Requiring Inpatient Management

    Directory of Open Access Journals (Sweden)

    Young-Geun Lee

    2013-11-01

    Full Text Available BackgroundMammalian bite injuries create a public health problem because of their frequency, potential severity, and increasing number. Some researchers have performed fragmentary analyses of bite wounds caused by certain mammalian species. However, little practical information is available concerning serious mammalian bite wounds that require hospitalization and intensive wound management. Therefore, the purpose of this study was to perform a general review of serious mammalian bite wounds.MethodsWe performed a retrospective review of the medical charts of 68 patients who were referred to our plastic surgery department for the treatment of bite wounds between January 2003 and October 2012. The cases were analyzed according to the species, patient demographics, environmental factors, injury characteristics, and clinical course.ResultsAmong the 68 cases of mammalian bite injury, 58 (85% were caused by dogs, 8 by humans, and 2 by cats. Most of those bitten by a human and both of those bitten by cats were male. Only one-third of all the patients were children or adolescents. The most frequent site of injury was the face, with 40 cases, followed by the hand, with 16 cases. Of the 68 patients, 7 were treated with secondary intention healing. Sixty-one patients underwent delayed procedures, including delayed direct closure, skin graft, composite graft, and local flap.ConclusionsBased on overall findings from our review of the 68 cases of mammalian bites, we suggest practical guidelines for the management of mammalian bite injuries, which could be useful in the treatment of serious mammalian bite wounds.

  8. Optimal Placement Method of RFID Readers in Industrial Rail Transport for Uneven Rail Traflc Volume Management

    Science.gov (United States)

    Rakhmangulov, Aleksandr; Muravev, Dmitri; Mishkurov, Pavel

    2016-11-01

    The issue of operative data reception on location and movement of railcars is significant the constantly growing requirements of the provision of timely and safe transportation. The technical solution for efficiency improvement of data collection on rail rolling stock is the implementation of an identification system. Nowadays, there are several such systems, distinguished in working principle. In the authors' opinion, the most promising for rail transportation is the RFID technology, proposing the equipping of the railway tracks by the stationary points of data reading (RFID readers) from the onboard sensors on the railcars. However, regardless of a specific type and manufacturer of these systems, their implementation is affiliated with the significant financing costs for large, industrial, rail transport systems, owning the extensive network of special railway tracks with a large number of stations and loading areas. To reduce the investment costs for creation, the identification system of rolling stock on the special railway tracks of industrial enterprises has developed the method based on the idea of priority installation of the RFID readers on railway hauls, where rail traffic volumes are uneven in structure and power, parameters of which is difficult or impossible to predict on the basis of existing data in an information system. To select the optimal locations of RFID readers, the mathematical model of the staged installation of such readers has developed depending on the non-uniformity value of rail traffic volumes, passing through the specific railway hauls. As a result of that approach, installation of the numerous RFID readers at all station tracks and loading areas of industrial railway stations might be not necessary,which reduces the total cost of the rolling stock identification and the implementation of the method for optimal management of transportation process.

  9. Management of Large Volumes of Waste Arising in a Nuclear or Radiological Emergency

    International Nuclear Information System (INIS)

    2017-10-01

    This publication, prepared in light of the IAEA Action Plan on Nuclear Safety developed after the accident at the Fukushima Daiichi nuclear power plant, addresses the management of large volumes of radioactive waste arising in a nuclear or radiological emergency, as part of overall emergency preparedness. The management of large volumes of waste will be one of many efforts to be dealt with to allow recovery of affected areas, to support return of evacuated or relocated populations and preparations for normal social and economic activities, and/or to mitigate additional environmental impacts. The publication is intended to be of use to national planners and policy makers, facility and programme managers, and other professionals responsible for developing and implementing national plans and strategies to manage radioactive waste arising from nuclear or radiological emergencies.

  10. Management plan documentation standard and Data Item Descriptions (DID). Volume of the information system life-cycle and documentation standards, volume 2

    Science.gov (United States)

    Callender, E. David; Steinbacher, Jody

    1989-01-01

    This is the second of five volumes of the Information System Life-Cycle and Documentation Standards. This volume provides a well-organized, easily used standard for management plans used in acquiring, assuring, and developing information systems and software, hardware, and operational procedures components, and related processes.

  11. 30 CFR 250.518 - What are the requirements for casing pressure management?

    Science.gov (United States)

    2010-07-01

    ... Operations Casing Pressure Management § 250.518 What are the requirements for casing pressure management... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What are the requirements for casing pressure management? 250.518 Section 250.518 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR...

  12. 40 CFR 63.11584 - What are my initial and continuous compliance management practice requirements?

    Science.gov (United States)

    2010-07-01

    ... compliance management practice requirements? 63.11584 Section 63.11584 Protection of Environment... What are my initial and continuous compliance management practice requirements? (a) For each new and... gr/dscf, the management practice requirements are as follows: (1) You must conduct an initial visual...

  13. [Management of opioid maintenance treatments when analgesic treatments are required].

    Science.gov (United States)

    Laprevote, Vincent; Geoffroy, Pierre A; Rolland, Benjamin; Leheup, Benoît F; Di Patrizio, Paolo; Cottencin, Olivier; Schwan, Raymund

    2013-01-01

    Opioid maintenance treatments (OMT) reduce illicit opiate use and its associated risks. They are often prescribed on a long-term basis. Physiological changes induced by long-term OMT may cause hyperalgesia and cross-tolerance to opioid agonists, which suggests that the dosage of analgesic treatment should be modified in cases of acute pain, especially when an opioid-based analgesia is required. When treatment with analgesics is necessary, OMT must be maintained, except in exceptional cases. If a split-dosing schedule is temporarily employed during OMT, the daily dosage should not be increased for analgesic purposes. Analgesic treatment must be managed differently in case of treatment with buprenorphine or methadone. With buprenorphine, non-opioid analgesics should be introduced first, if possible. If this strategy is inefficient or contraindicated, a temporary or definitive switch to methadone should be considered. In the case of methadone-based OMT, opioid analgesics should be added directly and the dosage should be adapted according to the level of pain reported by the patient. Copyright © 2013 Elsevier Masson SAS. All rights reserved.

  14. National Low-Level Waste Management Program Radionuclide Report Series, Volume 17: Plutonium-239

    International Nuclear Information System (INIS)

    Adams, J.P.; Carboneau, M.L.

    1999-01-01

    This report, Volume 17 of the National Low-Level Waste Management Program Radionuclide Report Series, discusses the radiological and chemical characteristics of plutonium-239 (Pu-239). This report also discusses waste types and forms in which Pu-239 can be found, waste and disposal information on Pu-239, and Pu-239 behavior in the environment and in the human body

  15. National Low-Level Waste Management Program Radionuclide Report Series, Volume 17: Plutonium-239

    Energy Technology Data Exchange (ETDEWEB)

    J. P. Adams; M. L. Carboneau

    1999-03-01

    This report, Volume 17 of the National Low-Level Waste Management Program Radionuclide Report Series, discusses the radiological and chemical characteristics of plutonium-239 (Pu-239). This report also discusses waste types and forms in which Pu-239 can be found, waste and disposal information on Pu-239, and Pu-239 behavior in the environment and in the human body.

  16. National Low-Level Waste Management Program radionuclide report series. Volume 13, Curium-242

    International Nuclear Information System (INIS)

    Adams, J.P.

    1995-08-01

    This report, Volume 13 of the National Low-Level Waste Management Program Radionuclide Report Series, discusses the radiological and chemical characteristics of curium-242 ( 242 Cm). This report also includes discussions about waste types and forms in which 242 Cm can be found and 242 Cm behavior in the environment and in the human body

  17. Employees' Perceptions of Email Communication, Volume and Management Strategies in an Australian University

    Science.gov (United States)

    Pignata, Silvia; Lushington, Kurt; Sloan, Jeremy; Buchanan, Fiona

    2015-01-01

    Despite email playing a central role in university business, little is known about the strategies used by staff to manage email and the factors contributing to email overload. In a mixed method study undertaken in one Australian university comparing academic (n = 193) and professional (n = 278) staff, we found that while email volume was higher in…

  18. National low-level waste management program radionuclide report series, Volume 14: Americium-241

    International Nuclear Information System (INIS)

    Winberg, M.R.; Garcia, R.S.

    1995-09-01

    This report, Volume 14 of the National Low-Level Waste Management Program Radionuclide Report Series, discusses the radiological and chemical characteristics of americium-241 ( 241 Am). This report also includes discussions about waste types and forms in which 241 Am can be found and 241 Am behavior in the environment and in the human body

  19. National Low-Level Waste Management Program radionuclide report series. Volume 13, Curium-242

    Energy Technology Data Exchange (ETDEWEB)

    Adams, J.P.

    1995-08-01

    This report, Volume 13 of the National Low-Level Waste Management Program Radionuclide Report Series, discusses the radiological and chemical characteristics of curium-242 ({sup 242}Cm). This report also includes discussions about waste types and forms in which {sup 242}Cm can be found and {sup 242}Cm behavior in the environment and in the human body.

  20. Maximizing conservation benefit for grassland species with contrasting management requirements

    NARCIS (Netherlands)

    Teeffelen, van A.J.A.; Cabeza, M.; Poyry, J.; Raatikainen, K.; Kuussaari, M.

    2008-01-01

    Conservation management often encompasses multiple, alternative management actions on a given site, involving habitat restoration and maintenance for example. Which actions are preferable depends on the conservation goals, the expected outcomes of actions, and their associated costs. When actions

  1. 5 CFR 9701.405 - Performance management system requirements.

    Science.gov (United States)

    2010-01-01

    ... feedback, and developing, rating, and rewarding performance; and (6) Specify the criteria and procedures to... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Performance management system... HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Performance Management § 9701.405 Performance...

  2. 23 CFR 970.204 - Management systems requirements.

    Science.gov (United States)

    2010-04-01

    ... management system outputs to systematically operate, maintain, and upgrade existing transportation assets cost-effectively; (3) A description of each management system; (4) A process to operate and maintain the management systems and their associated databases; and (5) A process for data collection...

  3. 23 CFR 971.204 - Management systems requirements.

    Science.gov (United States)

    2010-04-01

    ... of all management systems outputs to systematically operate, maintain, and upgrade existing transportation assets cost-effectively; (3) A description of each management system; (4) A process to operate and maintain the management systems and their associated databases; and (5) A process for data collection...

  4. Fusion Engineering Device. Volume V. Technology R and D requirements for construction

    International Nuclear Information System (INIS)

    1981-10-01

    This volume covers the following areas: (1) nuclear systems, (2) auxiliary heating, (3) magnet systems, (4) remote maintenance, (5) fueling, (6) diagnostics, instrumentation, information and control, and (7) safety and environment

  5. Assessment of management alternatives for LWR wastes. Volume 1. Main achievements of the joint study

    International Nuclear Information System (INIS)

    Glibert, R.C.

    1993-01-01

    This report deals with the main achievements of a joint theoretical study aimed at evaluating a selection of management routes for LWR wastes, relying to a certain extent on national practices in this particular area, on the basis of economical and radiological criteria. All individual intermediate steps entering a management route, from radioactive-wastes production up to their disposal in near-surface sites or in a deep repository, have been identified, described and cost-evaluated throughout the study. The radiological impact assessment comprises estimates of both individual and collective doses resulting from normal discharges of radioactive effluents and from disposal of radioactive waste products in near-surfaces sites. All specific data concerning the description of the different management routes considered as well as the methodology applied to evaluate cost and radiological impact are detailed in the subsequent volumes of the series (Volumes 2 to 8)

  6. Atlas-Based Segmentation Improves Consistency and Decreases Time Required for Contouring Postoperative Endometrial Cancer Nodal Volumes

    International Nuclear Information System (INIS)

    Young, Amy V.; Wortham, Angela; Wernick, Iddo; Evans, Andrew; Ennis, Ronald D.

    2011-01-01

    Purpose: Accurate target delineation of the nodal volumes is essential for three-dimensional conformal and intensity-modulated radiotherapy planning for endometrial cancer adjuvant therapy. We hypothesized that atlas-based segmentation ('autocontouring') would lead to time savings and more consistent contours among physicians. Methods and Materials: A reference anatomy atlas was constructed using the data from 15 postoperative endometrial cancer patients by contouring the pelvic nodal clinical target volume on the simulation computed tomography scan according to the Radiation Therapy Oncology Group 0418 trial using commercially available software. On the simulation computed tomography scans from 10 additional endometrial cancer patients, the nodal clinical target volume autocontours were generated. Three radiation oncologists corrected the autocontours and delineated the manual nodal contours under timed conditions while unaware of the other contours. The time difference was determined, and the overlap of the contours was calculated using Dice's coefficient. Results: For all physicians, manual contouring of the pelvic nodal target volumes and editing the autocontours required a mean ± standard deviation of 32 ± 9 vs. 23 ± 7 minutes, respectively (p = .000001), a 26% time savings. For each physician, the time required to delineate the manual contours vs. correcting the autocontours was 30 ± 3 vs. 21 ± 5 min (p = .003), 39 ± 12 vs. 30 ± 5 min (p = .055), and 29 ± 5 vs. 20 ± 5 min (p = .0002). The mean overlap increased from manual contouring (0.77) to correcting the autocontours (0.79; p = .038). Conclusion: The results of our study have shown that autocontouring leads to increased consistency and time savings when contouring the nodal target volumes for adjuvant treatment of endometrial cancer, although the autocontours still required careful editing to ensure that the lymph nodes at risk of recurrence are properly included in the target volume.

  7. Required Steps of Managing International Equity Placement Strategic Alliance

    OpenAIRE

    Wandebori, Harimukti; de Bruijn, Erik Joost; Steenhuis, Harm-Jan

    2011-01-01

    The purpose of the research is to unravel the steps of managing international equity placement strategic alliance (IEPSA). The steps of managing an IEPSA are obtained by conducting theoretical review. The theoretical reviews consist of theory of strategic alliance; definition, classification, and finding definition of an IEPSA, political and analytical considerations and the necessary steps. These steps of managing IEPSA can be classified into analyzing of macro consideration, micro considera...

  8. A risk management approach to double-shell tank waste volume versus storage capacity

    International Nuclear Information System (INIS)

    Coles, G.A.; Thurkow, T.J.; Fritz, R.L.; Nuhlestein, L.O.; Allen, M.R.; Stuart, R.J.

    1996-01-01

    A risk-based assessment of the overall waste volume versus double-shell tank storage capacity was conducted to develop fallback positions for projections where the waste volume was at a high risk of exceeding capacity. This study was initiated to provide that assessment. A working simulation model was the primary deliverable of this study. The model validates the approach and demonstrates that simulation analysis can provide a method of tracking uncertainties in available data, assessing probabilities, and serves as a tool to be used by management to determine the consequences of various off-normal occurrences

  9. A risk management approach to double-shell tank waste volume versus storage capacity

    Energy Technology Data Exchange (ETDEWEB)

    Coles, G.A. [Westinghouse Hanford Co., Richland, WA (United States); Thurkow, T.J.; Fritz, R.L.; Nuhlestein, L.O.; Allen, M.R.; Stuart, R.J. [ARES Corp. (United States)

    1996-01-01

    A risk-based assessment of the overall waste volume versus double-shell tank storage capacity was conducted to develop fallback positions for projections where the waste volume was at a high risk of exceeding capacity. This study was initiated to provide that assessment. A working simulation model was the primary deliverable of this study. The model validates the approach and demonstrates that simulation analysis can provide a method of tracking uncertainties in available data, assessing probabilities, and serves as a tool to be used by management to determine the consequences of various off-normal occurrences.

  10. Traceability of Requirements and Software Architecture for Change Management

    NARCIS (Netherlands)

    Göknil, Arda

    2011-01-01

    At the present day, software systems get more and more complex. The requirements of software systems change continuously and new requirements emerge frequently. New and/or modified requirements are integrated with the existing ones, and adaptations to the architecture and source code of the system

  11. Required Steps of Managing International Equity Placement Strategic Alliance

    Directory of Open Access Journals (Sweden)

    Harimukti Wandebori

    2011-12-01

    Full Text Available The purpose of the research is to unravel the steps of managing international equity placement strategic alliance (IEPSA. The steps of managing an IEPSA are obtained by conducting theoretical review. The theoretical reviews consist of theory of strategic alliance; definition, classification, and finding definition of an IEPSA, political and analytical considerations and the necessary steps. These steps of managing IEPSA can be classified into analyzing of macro consideration, micro consideration, domestic company’s stakeholder support, cultural understanding, strategic planning, internal support, human resource management, organizational arrangement, management control system, evolved cultural understanding, and evaluating results. In this research, the domestic partners who formed the IEPSAs are limited to State-Owned Enterprises (SOEs. The IEPSA was one of the means of privatization. The research will be beneficial for both foreign and domestic partners who form an IEPSA in the previous SOEs. By knowing the steps of managing the IEPSA both partners will be able to secure a successful implementation of IEPSA. By identifying the steps of managing the IEPSA, the stakeholder will not see IEPSA as threat rather as an opportunity to improve performance, to create synergy, and generate benefits for both partners and stakeholder. By knowing the necessary steps of managing the IEPSA, the stakeholder including society and politician will envisage the IEPSA as a means of effectively improving the SOEs’ performances.The research was espected to provide contributions for the research on strategic alliances. Apparently, there exist no literatures discussing about IEPSA in the domain of strategic alliances.

  12. Requirements of supply chain management in differentiating European pork chains

    NARCIS (Netherlands)

    Trienekens, J.H.; Wognum, P.M.

    2013-01-01

    This paper summarizes results obtained by research into pork chain management in the EU Integrated Project Q-Porkchains. Changing demands for intrinsic and extrinsic quality attributes of pork products impact the way supply chain management should be organized from the farmer down to the consumer.

  13. 40 CFR 63.11495 - What are the management practices and other requirements?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 14 2010-07-01 2010-07-01 false What are the management practices and... Area Sources Standards and Compliance Requirements § 63.11495 What are the management practices and other requirements? (a) Management practices. If you have a CMPU subject to this subpart, you must...

  14. 40 CFR 63.10420 - How do I demonstrate continuous compliance with the management practice requirements?

    Science.gov (United States)

    2010-07-01

    ... compliance with the management practice requirements? 63.10420 Section 63.10420 Protection of Environment... continuous compliance with the management practice requirements? For each sterilization unit not equipped with an air pollution control device, you must demonstrate continuous compliance with the management...

  15. Fusion Engineering Device. Volume IV. Physics basis and physics R and D requirements

    International Nuclear Information System (INIS)

    1981-10-01

    This volume covers the following issues: (1) confinement scaling, (2) cross section shaping, limits on B and q, (3) ion cyclotron heating, (4) neutral beam heating, (5) mechanical pump limiter, (6) poloidal divertor, and (7) non-divertor active impurity control

  16. 40 CFR 271.12 - Requirements for hazardous waste management facilities.

    Science.gov (United States)

    2010-07-01

    ... Requirements for Final Authorization § 271.12 Requirements for hazardous waste management facilities. The State shall have standards for hazardous waste management facilities which are equivalent to 40 CFR parts 264... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Requirements for hazardous waste...

  17. Environmental management for dredging sediments - the requirement of developing nations.

    Science.gov (United States)

    Manap, Norpadzlihatun; Voulvoulis, Nikolaos

    2015-01-01

    Scientific research has characterized the effects of dredging, an underwater excavation process for navigational purposes or material extraction, and has shown its association with a number of chemical, physical and biological impacts. Due to this, much environmental management has been applied in the dredging industry in order to manage its detrimental effects. However, developing nations may have different approaches towards their dredging environmental management to compare to their companions with higher economic strength. Moreover, scientific evidence to make an informed decision is often lacking, hence affecting the number of research executed at these nations, limiting their efforts to preserve the environment. This paper reviews the dredging environmental impacts and its two important factors, dredging technology and sediment characteristic, that determine the magnitude of impacts through literature review, and discusses the need for a more integrated dredging environmental management to be developed for developing nations. Copyright © 2014 Elsevier Ltd. All rights reserved.

  18. Cryptographic Trust Management Requirements Specification: Version 1.1

    Energy Technology Data Exchange (ETDEWEB)

    Edgar, Thomas W.

    2009-09-30

    The Cryptographic Trust Management (CTM) Project is being developed for Department of Energy, OE-10 by the Pacific Northwest National Laboratory (PNNL). It is a component project of the NSTB Control Systems Security R&D Program.

  19. A Required Rotation in Clinical Laboratory Management for Pathology Residents

    OpenAIRE

    Arvind Rishi MD; Syed T. Hoda MD; James M. Crawford MD, PhD

    2016-01-01

    Leadership and management training during pathology residency have been identified repeatedly by employers as insufficient. A 1-month rotation in clinical laboratory management (CLM) was created for third-year pathology residents. We report on our experience and assess the value of this rotation. The rotation was one-half observational and one-half active. The observational component involved being a member of department and laboratory service line leadership, both at the departmental and ins...

  20. Nurse management skills required at an emergency care unit

    OpenAIRE

    Montezeli, Juliana Helena; Peres, Aida Maris; Bernardino, Elizabeth

    2013-01-01

    Objective: To identify the management skills needed for this professional at an emergency care unit. Method: An exploratory descriptive qualitative study conducted with eight nurses in which semi-structured interviews with nonparticipating systematic observation were conducted; the data was processed by content analysis. Results: The categories which emerged from the content analysis served as a list of management skills necessary to their work at the emergency care unit: leadership, decision...

  1. Required Steps of Managing International Equity Placement Strategic Alliance

    Directory of Open Access Journals (Sweden)

    Harimukti Wandebori

    2012-01-01

    Full Text Available The purpose of the research is to unravel the steps of managing international equity placement strategic alliance (IEPSA. The steps of managing an IEPSA are obtained by conducting theoretical review. The theoretical reviews consist of theory of strategic alliance; definition, classification, and finding definition of an IEPSA, political and analytical considerations and the necessary steps. These steps of managing IEPSA can be classified into analyzing of macro consideration, micro consideration, domestic company’s stakeholder support, cultural understanding, strategic planning, internal support, human resource management, organizational arrangement, management control system, evolved cultural understanding, and evaluating results. In this research, the domestic partners who formed the IEPSAs are limited to State-Owned Enterprises (SOEs. The IEPSA was one of the means of privatization. The research will be beneficial for both foreign and domestic partners who form an IEPSA in the previous SOEs. By knowing the steps of managing the IEPSA both partners will be able to secure a successful implementation of IEPSA. By identifying the steps of managing the IEPSA, the stakeholder will not see IEPSA as threat rather as an opportunity to improve performance, to create synergy, and generate benefits for both partners and stakeholder. By knowing the necessary steps of managing the IEPSA, the stakeholder including society and politician will envisage the IEPSA as a means of effectively improving the SOEs’ performances.The research was espected to provide contributions for the research on strategic alliances. Apparently, there exist no literatures discussing about IEPSA in the domain of strategic alliances. Keywords: strategic alliance, equity placement, international equity placement strategic alliance, privatization, steps of international equity placement strategic alliance, state-owned enterprises

  2. [Difficult Ventilation Requiring Emergency Endotracheal Intubation during Awake Craniotomy Managed by Laryngeal Mask Airway].

    Science.gov (United States)

    Matsuda, Asako; Mizota, Toshiyuki; Tanaka, Tomoharu; Segawa, Hajime; Fukuda, Kazuhiko

    2016-04-01

    We report a case of difficult ventilation requiring emergency endotracheal intubation during awake craniotomy managed by laryngeal mask airway (LMA). A 45-year-old woman was scheduled to receive awake craniotomy for brain tumor in the frontal lobe. After anesthetic induction, airway was secured using ProSeal LMA and patient was mechanically ventilated in pressure-control mode. Patient's head was fixed with head-pins at anteflex position, and the operation started. About one hour after the start of the operation, tidal volume suddenly decreased. We immediately started manual ventilation, but the airway resistance was extremely high and we could not adequately ventilate the patient. We administered muscle relaxant for suspected laryngospasm, but ventilatory status did not improve; so we decided to conduct emergency endotracheal intubation. We tried to intubate using Airwayscope or LMA-Fastrach, but they were not effective in our case. Finally trachea was intubated using transnasal fiberoptic bronchoscopy. We discuss airway management during awake craniotomy, focusing on emergency endotracheal intubation during surgery.

  3. Geothermal power development in Hawaii. Volume II. Infrastructure and community-services requirements, Island of Hawaii

    Energy Technology Data Exchange (ETDEWEB)

    Chapman, G.A.; Buevens, W.R.

    1982-06-01

    The requirements of infrastructure and community services necessary to accommodate the development of geothermal energy on the Island of Hawaii for electricity production are identified. The following aspects are covered: Puna District-1981, labor resources, geothermal development scenarios, geothermal land use, the impact of geothermal development on Puna, labor resource requirments, and the requirements for government activity.

  4. Information management system study results. Volume 2: IMS study results appendixes

    Science.gov (United States)

    1971-01-01

    Computer systems program specifications are presented for the modular space station information management system. These are the computer program contract end item, data bus system, data bus breadboard, and display interface adapter specifications. The performance, design, tests, and qualification requirements are established for the implementation of the information management system. For Vol. 1, see N72-19972.

  5. Software requirements specification for the program analysis and control system risk management module

    International Nuclear Information System (INIS)

    SCHAEFER, J.C.

    1999-01-01

    TWR Program Analysis and Control System Risk Module is used to facilitate specific data processes surrounding the Risk Management program of the Tank Waste Retrieval environment. This document contains the Risk Management system requirements of the database system

  6. The Effect of Management Compensation and Debt Requirements on Earnings Management Concerning The Impairment of Assets

    Directory of Open Access Journals (Sweden)

    Lloyd Kevin Co Abrigo

    2016-03-01

    Full Text Available This study determines the relationship between the impairment decision, as well as its magnitude, and two earnings management motivations, namely increasing management compensation, and meeting debt requirements. The computation of value in use in the impairment loss is subject to management’s estimate of future cash flows and choice of discount rate, which tolerates earnings management. Certain indicators and financial ratios were used to depict the effect of the two motives on impairment. In addition to this, the effect of firm size on impairment was also analyzed. The data were obtained from the OSIRIS database and the SEC form 17-A of the respective companies, as well as from telephone interviews and surveys. Probit regression was used to analyze the effect of the different motives to the impairment decision while multiple linear regression was used for the impairment magnitude. The findings show that publicly listed companies in the Philippines are engaging in “income smoothing” and “big bath” accounting with the use of impairment. Results also indicate that most “big bath” happens during periods where changes in the company’s executive officers occur. Lastly, there is also evidence that financially strong companies are deferring their impairment recognition to obtain a lower cost of financing.

  7. Resource management plan for the Oak Ridge Reservation. Volume 27, Wildlife Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Parr, P.D. [Oak Ridge National Lab., TN (United States); Evans, J.W. [Tennessee Wildlife Resources Agency, Knoxville, TN (United States)

    1992-06-01

    A plan for management of the wildlife resources on the US Department of Energy`s Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory`s Environmental Sciences Division.

  8. End-to-end requirements management for multiprojects in the construction industry

    DEFF Research Database (Denmark)

    Wörösch, Michael

    Performance Concrete and insulation materials – is used. By means of action research and interviews of case project staff it has become evident that many elements of formalized requirements management are missing in the case project. To fill those gaps and be able to manage requirements end...... with regards to requirements management. As the literature study gives little new information, a series of interviews are initiated with experts from industry and universities. Those interviews reveal major shortcomings in the way requirements are handled in Danish construction companies today. In order...... to give managers of construction projects a useful and guiding tool for formally managing requirements that is rooted in practice, the “Conceptual requirements management framework”, is created. The framework builds upon the gathered empirical data, obtained by action research, interviews, and available...

  9. National low-level waste management program radionuclide report series, Volume 15: Uranium-238

    International Nuclear Information System (INIS)

    Adams, J.P.

    1995-09-01

    This report, Volume 15 of the National Low-Level Waste Management Program Radionuclide Report Series, discusses the radiological and chemical characteristics of uranium-238 ( 238 U). The purpose of the National Low-Level Waste Management Program Radionuclide Report Series is to provide information to state representatives and developers of low-level radioactive waste disposal facilities about the radiological, chemical, and physical characteristics of selected radionuclides and their behavior in the waste disposal facility environment. This report also includes discussions about waste types and forms in which 238 U can be found, and 238 U behavior in the environment and in the human body

  10. Final Programmatic Environmental Impact Statement for stockpile stewardship and management: Volume 1

    International Nuclear Information System (INIS)

    1996-09-01

    The Department of Energy (DOE) has been directed by the President and Congress to maintain the safety and reliability of the reduced nuclear weapons stockpile in the absence of underground nuclear testing. In order to fulfill that responsibility, DOE has developed Stockpile Stewardship and Maintenance Program to provide a single highly integrated technical program for maintaining the continued safety and reliability of the nuclear stockpile. The Stockpile Stewardship and Management Program Programmatic Environmental Impact Statement (PEIS) describes and analyzes alternative ways to implement the proposed actions for the Stockpile Stewardship and Management Program. This document contains Volume I of the PEIS

  11. Requirements of supply chain management in differentiating European pork chains.

    Science.gov (United States)

    Trienekens, Jacques; Wognum, Nel

    2013-11-01

    This paper summarizes results obtained by research into pork chain management in the EU Integrated Project Q-Porkchains. Changing demands for intrinsic and extrinsic quality attributes of pork products impact the way supply chain management should be organized from the farmer down to the consumer. The paper shows the importance of Quality Management Systems for integrating supply chains and enhancing consumer confidence. The paper also presents innovations in information system integration for aligning information exchange in the supply chain and logistics concepts based on innovative measurement technologies at the slaughterhouse stage. In the final section research challenges towards sustainable pork supply chains satisfying current consumer demands are presented. Copyright © 2013 Elsevier Ltd. All rights reserved.

  12. Step 1: Human System Integration (HSI) FY05 Pilot-Technology Interface Requirements for Contingency Management

    Science.gov (United States)

    2005-01-01

    This document involves definition of technology interface requirements for Contingency Management. This was performed through a review of Contingency Management-related, HSI requirements documents, standards, and recommended practices. Technology concepts in use by the Contingency Management Work Package were considered. Beginning with HSI high-level functional requirements for Contingency Management, and Contingency Management technology elements, HSI requirements for the interface to the pilot were identified. Results of the analysis describe (1) the information required by the pilot to have knowledge of system failures and associated contingency procedures, and (2) the control capability needed by the pilot to obtain system status and procedure information. Fundamentally, these requirements provide the candidate Contingency Management technology concepts with the necessary human-related elements to make them compatible with human capabilities and limitations. The results of the analysis describe how Contingency Management operations and functions should interface with the pilot to provide the necessary Contingency Management functionality to the UA-pilot system. Requirements and guidelines for Contingency Management are partitioned into four categories: (1) Health and Status and (2) Contingency Management. Each requirement is stated and is supported with a rationale and associated reference(s).

  13. Volume reduction options for the management of low-level radioactive wastes

    International Nuclear Information System (INIS)

    Clark, D.E.; Lerch, R.E.

    1977-01-01

    This paper examines volume reduction options that are now or soon will be available for low-level wastes. These wastes generally are in the form of combustible solids, noncombustible solids, and wet wastes (solid/liquid). Initially, the wastes are collected and stored onsite. Preconditioning may be required, e.g., sorting, shredding, and classifying the solids into combustible and noncombustible fractions. The volume of combustible solids can be reduced by compaction, incineration/pyrolysis, acid digestion, or molten salt combustion. Options for reducing the volume of noncombustible solids include compaction, size reduction and decontamination, meltdown-casting, dissolution and electropolishing. Burnable wet wastes (e.g., organic wastes) can be evaporated or combusted; nonburnable wet wastes can be treated by various evaporative or nonevaporative processes. All radioactive waste processing operations result in some equipment contamination and the production of additional radioactively contaminated wastes (secondary wastes). 23 figures

  14. Distributed Cognition in the Management of Design Requirements

    OpenAIRE

    Hansen, Sean; Lyytinen, Kalle

    2009-01-01

    In this position statement, we outline a new theoretical framework of the distribution of design requirements processes. Building upon the Theory of Distributed Cognition, we characterize contemporary requirements efforts as distributed cognitive systems in which elements of a design vision are distributed socially, structurally, and temporally. We discuss the various forms of distribution observed in real-world systems development projects and the processes by which representational states ...

  15. Design requirements for SRB production control system. Volume 1: Study background and overview

    Science.gov (United States)

    1981-01-01

    The solid rocket boosters assembly environment is described in terms of the contraints it places upon an automated production control system. The business system generated for the SRB assembly and the computer system which meets the business system requirements are described. The selection software process and modifications required to the recommended software are addressed as well as the hardware and configuration requirements necessary to support the system.

  16. A Required Rotation in Clinical Laboratory Management for Pathology Residents

    Science.gov (United States)

    Hoda, Syed T.; Crawford, James M.

    2016-01-01

    Leadership and management training during pathology residency have been identified repeatedly by employers as insufficient. A 1-month rotation in clinical laboratory management (CLM) was created for third-year pathology residents. We report on our experience and assess the value of this rotation. The rotation was one-half observational and one-half active. The observational component involved being a member of department and laboratory service line leadership, both at the departmental and institutional level. Observational participation enabled learning of both the content and principles of leadership and management activities. The active half of the rotation was performance of a project intended to advance the strategic trajectory of the department and laboratory service line. In our program that matriculates 4 residents per year, 20 residents participated from April 2010 through December 2015. Their projects either activated a new priority area or helped propel an existing strategic priority forward. Of the 16 resident graduates who had obtained their first employment or a fellowship position, 9 responded to an assessment survey. The majority of respondents (5/9) felt that the rotation significantly contributed to their ability to compete for a fellowship or their first employment position. The top reported benefits of the rotation included people management; communication with staff, departmental, and institutional leadership; and involvement in department and institutional meetings and task groups. Our 5-year experience demonstrates both the successful principles by which the CLM rotation can be established and the high value of this rotation to residency graduates. PMID:28725766

  17. A Required Rotation in Clinical Laboratory Management for Pathology Residents

    Directory of Open Access Journals (Sweden)

    Arvind Rishi MD

    2016-05-01

    Full Text Available Leadership and management training during pathology residency have been identified repeatedly by employers as insufficient. A 1-month rotation in clinical laboratory management (CLM was created for third-year pathology residents. We report on our experience and assess the value of this rotation. The rotation was one-half observational and one-half active. The observational component involved being a member of department and laboratory service line leadership, both at the departmental and institutional level. Observational participation enabled learning of both the content and principles of leadership and management activities. The active half of the rotation was performance of a project intended to advance the strategic trajectory of the department and laboratory service line. In our program that matriculates 4 residents per year, 20 residents participated from April 2010 through December 2015. Their projects either activated a new priority area or helped propel an existing strategic priority forward. Of the 16 resident graduates who had obtained their first employment or a fellowship position, 9 responded to an assessment survey. The majority of respondents (5/9 felt that the rotation significantly contributed to their ability to compete for a fellowship or their first employment position. The top reported benefits of the rotation included people management; communication with staff, departmental, and institutional leadership; and involvement in department and institutional meetings and task groups. Our 5-year experience demonstrates both the successful principles by which the CLM rotation can be established and the high value of this rotation to residency graduates.

  18. FBI fingerprint identification automation study: AIDS 3 evaluation report. Volume 9: Functional requirements

    Science.gov (United States)

    1980-01-01

    The current system and subsystem used by the Identification Division are described. System constraints that dictate the system environment are discussed and boundaries within which solutions must be found are described. The functional requirements were related to the performance requirements. These performance requirements were then related to their applicable subsystems. The flow of data, documents, or other pieces of information from one subsystem to another or from the external world into the identification system is described. Requirements and design standards for a computer based system are presented.

  19. High-level waste storage tank farms/242-A evaporator Standards/Requirements Identification Document (S/RID), Volume 7. Revision 1

    International Nuclear Information System (INIS)

    Burt, D.L.

    1994-04-01

    The High-Level Waste Storage Tank Farms/242-A Evaporator Standards/Requirements Identification Document (S/RID) is contained in multiple volumes. This document (Volume 7) presents the standards and requirements for the following sections: Occupational Safety and Health, and Environmental Protection

  20. High-level waste storage tank farms/242-A evaporator Standards/Requirements Identification Document (S/RID), Volume 7. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Burt, D.L.

    1994-04-01

    The High-Level Waste Storage Tank Farms/242-A Evaporator Standards/Requirements Identification Document (S/RID) is contained in multiple volumes. This document (Volume 7) presents the standards and requirements for the following sections: Occupational Safety and Health, and Environmental Protection.

  1. Space station needs, attributes and architectural options study. Volume 3: Mission requirements

    Science.gov (United States)

    1983-04-01

    User missions that are enabled or enhanced by a manned space station are identified. The mission capability requirements imposed on the space station by these users are delineated. The accommodation facilities, equipment, and functional requirements necessary to achieve these capabilities are identified, and the economic, performance, and social benefits which accrue from the space station are defined.

  2. Spacelab Level 4 Programmatic Implementation Assessment Study. Volume 2: Ground Processing requirements

    Science.gov (United States)

    1978-01-01

    Alternate ground processing options are summarized, including installation and test requirements for payloads, space processing, combined astronomy, and life sciences. The level 4 integration resource requirements are also reviewed for: personnel, temporary relocation, transportation, ground support equipment, and Spacelab flight hardware.

  3. Transaction-based building controls framework, Volume 2: Platform descriptive model and requirements

    Energy Technology Data Exchange (ETDEWEB)

    Akyol, Bora A. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Haack, Jereme N. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Carpenter, Brandon J. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Katipamula, Srinivas [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Lutes, Robert G. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Hernandez, George [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States)

    2015-07-31

    Transaction-based Building Controls (TBC) offer a control systems platform that provides an agent execution environment that meets the growing requirements for security, resource utilization, and reliability. This report outlines the requirements for a platform to meet these needs and describes an illustrative/exemplary implementation.

  4. Spacelab user implementation assessment study. (Software requirements analysis). Volume 2: Technical report

    Science.gov (United States)

    1976-01-01

    The engineering analyses and evaluation studies conducted for the Software Requirements Analysis are discussed. Included are the development of the study data base, synthesis of implementation approaches for software required by both mandatory onboard computer services and command/control functions, and identification and implementation of software for ground processing activities.

  5. RELAP5/MOD3 code manual: User's guide and input requirements. Volume 2

    International Nuclear Information System (INIS)

    1995-08-01

    The RELAP5 code has been developed for best estimate transient simulation of light water reactor coolant systems during postulated accidents. The code models the coupled behavior of the reactor coolant system and the core for loss-of-coolant accidents, and operational transients, such as anticipated transient without scram, loss of offsite power, loss of feedwater, and loss of flow. A generic modeling approach is used that permits simulating a variety of thermal hydraulic systems. Control system and secondary system components are included to permit modeling of plant controls, turbines, condensers, and secondary feedwater systems. Volume II contains detailed instructions for code application and input data preparation

  6. Towards a Scope Management of Non-Functional Requirements in Requirements Engineering

    NARCIS (Netherlands)

    Kassab, M.; Ormandjieva, O.; Daneva, Maia; Ebert, C.; Herrmann, A.; Rupp, C.

    2007-01-01

    Getting business stakeholders’ goals formulated clearly and project scope defined realistically increases the chance of success for any application development process. As a consequence, stakeholders at early project stages acquire as much as possible knowledge about the requirements, their risk

  7. Myasthenic crisis patients who require intensive care unit management.

    Science.gov (United States)

    Sakaguchi, Hideya; Yamashita, Satoshi; Hirano, Teruyuki; Nakajima, Makoto; Kimura, En; Maeda, Yasushi; Uchino, Makoto

    2012-09-01

    The purpose of this report was to investigate predictive factors that necessitate intensive care in myasthenic crisis (MC). We retrospectively reviewed MC patients at our institution and compared ICU and ward management groups. Higher MG-ADL scale scores, non-ocular initial symptoms, infection-triggered findings, and higher MGFA classification were observed more frequently in the ICU group. In patients with these prognostic factors, better outcomes may be obtained with early institution of intensive care. Copyright © 2012 Wiley Periodicals, Inc.

  8. Instant dependency management with RequireJS how-to

    CERN Document Server

    Franko, Greg

    2013-01-01

    Filled with practical, step-by-step instructions and clear explanations for the most important and useful tasks.A concise guide that delivers immediate results with practical recipes on customizing your projects.This book is for intermediate to advanced JavaScript developers who are interested in learning more about AMD specification and RequireJS.

  9. 13 CFR 108.150 - Management and ownership diversity requirement.

    Science.gov (United States)

    2010-01-01

    ... VENTURE CAPITAL (âNMVCâ) PROGRAM Qualifications for the NMVC Program Organizing A Nmvc Company § 108.150... 70 percent of your Regulatory Capital or your Leverageable Capital. (c) Non-affiliation requirement. At least 30 percent of your Regulatory Capital and Leverageable Capital must be owned and controlled...

  10. Final Programmatic Environmental Impact Statement for stockpile stewardship and management: Volume 3

    International Nuclear Information System (INIS)

    1996-09-01

    The Department of Energy (DOE) has been directed by the President and Congress to maintain the safety and reliability of the reduced nuclear weapons stockpile in the absence of underground nuclear testing. In order to fulfill that responsibility, DOE has developed a Stockpile Stewardship and Management Program to provide a single highly integrated technical program for maintaining the continued safety and reliability of the nuclear stockpile. The Stockpile Stewardship and Management Programmatic Environmental Impact Statement (PEIS) describes and analyzes alternative ways to implement the proposed actions for the Stockpile Stewardship and Management Program. This document consists of Volume III, Appendix I entitled ''National Ignition Facility Project-Specific Analysis,'' which investigates the environmental impacts resulting from constructing and operating the proposed National Ignition Facility

  11. Station set requirements document. Volume 82: Fire support. Book 2: Preliminary functional fire plan

    Science.gov (United States)

    Gray, N. C.

    1974-01-01

    The fire prevention/protection requirements for all shuttle facility and ground support equipment are presented for the hazardous operations. These include: preparing the orbiter for launch, launch operations, landing operations, safing operations, and associated off-line activities.

  12. Mission requirements for a manned earth observatory. Task 2: Reference mission definition and analyiss, volume 2

    Science.gov (United States)

    1973-01-01

    The mission requirements and conceptual design of manned earth observatory payloads for the 1980 time period are discussed. Projections of 1980 sensor technology and user data requirements were used to formulate typical basic criteria pertaining to experiments, sensor complements, and reference missions. The subjects discussed are: (1) mission selection and prioritization, (2) baseline mission analysis, (3) earth observation data handling and contingency plans, and (4) analysis of low cost mission definition and rationale.

  13. Cryogenic propellant management: Integration of design, performance and operational requirements

    Science.gov (United States)

    Worlund, A. L.; Jamieson, J. R., Jr.; Cole, T. W.; Lak, T. I.

    1985-01-01

    The integration of the design features of the Shuttle elements into a cryogenic propellant management system is described. The implementation and verification of the design/operational changes resulting from design deficiencies and/or element incompatibilities encountered subsequent to the critical design reviews are emphasized. Major topics include: subsystem designs to provide liquid oxygen (LO2) tank pressure stabilization, LO2 facility vent for ice prevention, liquid hydrogen (LH2) feedline high point bleed, pogo suppression on the Space Shuttle Main Engine (SSME), LO2 low level cutoff, Orbiter/engine propellant dump, and LO2 main feedline helium injection for geyser prevention.

  14. National Waste Terminal Storage Program Information Management Plan. Volume I. Management summary

    International Nuclear Information System (INIS)

    1977-05-01

    A comprehensive information management plan is needed for the processing of the large amount of documentation that will accumulate in the National Waste Terminal Storage program over the next decade. The plan will apply to all documentation from OWI contractors, subcontractors, and suppliers, and to external documentation from OWI organizations

  15. National waste terminal storage program: configuration management plan. Volume I. Management summary

    International Nuclear Information System (INIS)

    1977-05-01

    Objective of the Configuration Management Plan is to describe the Office of Waste Isolation's approach for the systematic identification, change control, status accounting, and auditing of: documents defining the NWTS Program and the plans for attaining the defined objectives; physical and functional characteristics of each storage site, facility, systems and equipment; and associated costs and schedules

  16. 76 FR 16588 - Risk Management Requirements for Derivatives Clearing Organizations; Correction

    Science.gov (United States)

    2011-03-24

    ... COMMODITY FUTURES TRADING COMMISSION 17 CFR Part 39 RIN 3038-AC98 Risk Management Requirements for Derivatives Clearing Organizations; Correction AGENCY: Commodity Futures Trading Commission. ACTION: Notice of... Register of January 20, 2011, regarding Risk Management Requirements for Derivatives Clearing Organizations...

  17. Emerging Requirements for Technology Management: A Sector-based Scenario Planning Approach

    Directory of Open Access Journals (Sweden)

    Simon Patrick Philbin

    2013-09-01

    Full Text Available Identifying the emerging requirements for technology management will help organisations to prepare for the future and remain competitive. Indeed technology management as a discipline needs to develop and respond to societal and industrial needs as well as the corresponding technology challenges. Therefore, following a review of technology forecasting methodologies, a sector-based scenario planning approach has been used to derive the emerging requirements for technology management. This structured framework provided an analytical lens to focus on the requirements for managing technology in the healthcare, energy and higher education sectors over the next 5-10 years. These requirements include the need for new business models to support the adoption of technologies; integration of new technologies with existing delivery channels; management of technology options including R&D project management; technology standards, validation and interoperability; and decision-making tools to support technology investment.

  18. BEST PRACTICES TO SUPPORT AND IMPROVE PAVEMENT MANAGEMENT SYSTEMS FOR LOW-VOLUME PAVED ROADS – PHASE I

    Science.gov (United States)

    2018-02-02

    The Colorado Department of Transportation (CDOT) has been trying to identify the most effective methods for managing low-volume roads (LVRs). These roads are facing multiple challenges including: reductions in maintenance budgets, impact of industria...

  19. Concept for a Satellite-Based Advanced Air Traffic Management System : Volume 4. Operational Description and Qualitative Assessment.

    Science.gov (United States)

    1974-02-01

    The volume presents a description of how the Satellite-Based Advanced Air Traffic Management System (SAATMS) operates and a qualitative assessment of the system. The operational description includes the services, functions, and tasks performed by the...

  20. Evaluation of the Navy Implementation of DOD Financial Management Regulation, Volume 14, Administrative Control of Funds and Antideficiency Act Violations

    National Research Council Canada - National Science Library

    Lane, F

    1996-01-01

    On August 1, 1995, the Under Secretary of Defense (Comptroller) released for implementation Financial Management Regulation, volume 14, "Administrative Control of Funds and Antideficiency Act Violations," August 1, 1995...

  1. 36 CFR 223.218 - Consistency with plans, environmental standards, and other management requirements.

    Science.gov (United States)

    2010-07-01

    ..., environmental standards, and other management requirements. 223.218 Section 223.218 Parks, Forests, and Public... Special Forest Products § 223.218 Consistency with plans, environmental standards, and other management... with applicable land management plans. Each contract, permit, or other authorizing instrument shall...

  2. 12 CFR 652.15 - Interest rate risk management and requirements.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Interest rate risk management and requirements... AGRICULTURAL MORTGAGE CORPORATION FUNDING AND FISCAL AFFAIRS Investment Management § 652.15 Interest rate risk... (direction, controls, and supervision) to the interest rate risk management program and must be knowledgeable...

  3. Ceramic transactions: Environmental and waste management issues in the ceramic industry. Volume 39

    International Nuclear Information System (INIS)

    Mellinger, G.B.

    1994-01-01

    A symposium on environmental and waste management issues in the ceramic industry took place in Cincinnati, Ohio, April 19-22, 1993. The symposium was held in conjunction with the 95th Annual Meeting of the American Ceramic Society and was sponsored by the Ceramic Manufacturing Council, Legislative and Regulatory Affairs Committee with the Glass and Optical Materials, Basic Science, Cements, Nuclear, Refractory Ceramics, Structural Clay Products, Whitewares, Design, Electronics, Engineering Ceramics, and Materials and Equipment Divisions. This volume documents several of the papers that were presented at the symposium. Papers presented in this volume are categorized under the following headings: vitrification of hazardous and mixed wastes; waste glass properties and microstructure; processing of nuclear waste disposal glasses; waste form qualification; glass dissolution: modeling and mechanisms; systems and field testing of waste forms

  4. Space station automation study: Automation requirements derived from space manufacturing concepts. Volume 1: Executive summary

    Science.gov (United States)

    1984-01-01

    The electroepitaxial process and the Very Large Scale Integration (VLSI) circuits (chips) facilities were chosen because each requires a very high degree of automation, and therefore involved extensive use of teleoperators, robotics, process mechanization, and artificial intelligence. Both cover a raw materials process and a sophisticated multi-step process and are therfore highly representative of the kinds of difficult operation, maintenance, and repair challenges which can be expected for any type of space manufacturing facility. Generic areas were identified which will require significant further study. The initial design will be based on terrestrial state-of-the-art hard automation. One hundred candidate missions were evaluated on the basis of automation portential and availability of meaning ful knowldege. The design requirements and unconstrained design concepts developed for the two missions are presented.

  5. Identifying environmental safety and health requirements for an Environmental Restoration Management Contractor

    International Nuclear Information System (INIS)

    Beckman, W.H.; Cossel, S.C.; Alhadeff, N.; Lindamood, S.B.; Beers, J.A.

    1993-10-01

    The purpose of the Standards/Requirements Identification Program, developed partially in response to the Defense Nuclear Facilities Safety Board Recommendation 90-2, was to identify applicable requirements that established the Environmental Restoration Management Contractor's (ERMC) responsibilities and authorities under the Environmental Restoration Management Contract, determine the adequacy of these requirements, ascertain a baseline level of compliance with them, and implement a maintenance program that would keep the program current as requirements or compliance levels change. The resultant Standards/Requirements Identification Documents (S/RIDs) consolidate the applicable requirements. These documents govern the development of procedures and manuals to ensure compliance with the requirements. Twenty-four such documents, corresponding with each functional area identified at the site, are to be issued. These requirements are included in the contractor's management plan

  6. M-Area hazardous waste management facility groundwater monitoring report -- first quarter 1994. Volume 1

    International Nuclear Information System (INIS)

    Evans, C.S.; Washburn, F.; Jordan, J.; Van Pelt, R.

    1994-05-01

    This report describes the groundwater monitoring and corrective action program at the M-Area Hazardous Waste Management Facility (HWMF) at the Savannah River Site (SRS) during first quarter 1994 as required by South Carolina Hazardous Waste Permit SC1-890-008-989 and section 264.100(g) of the South Carolina Hazardous Waste Management Regulations. During first quarter 1994, 42 point-of-compliance (POC) wells at the M-Area HWMF were sampled for drinking water parameters

  7. 40 CFR 799.5085 - Chemical testing requirements for certain high production volume chemicals.

    Science.gov (United States)

    2010-07-01

    ... Ave., NW., Washington, DC or at the National Archives and Records Administration (NARA). For...) Method B: ASTM E 1147 (liquid chromatography) Method C: 40 CFR 799.6756 (generator column) 5. Water... (generator column) n-Octanol/water Partition Coefficient or log Kow:Which method is required, if any, is...

  8. Estimating the Cold War mortgage: The 1995 baseline environmental management report. Volume 1

    International Nuclear Information System (INIS)

    1995-03-01

    This is the first annual report on the activities and potentials costs required to address the waste, contamination, and surplus nuclear facilities that are the responsibility of the Department of Energy's Environmental Management program. The Department's Office of Environmental Management, established in 1989, manages one of the largest environmental programs in the world--with more than 130 sites and facilities in over 30 States and territories. The primary focus of the program is to reduce health and safety risks from radioactive waste and contamination resulting from the production, development, and testing of nuclear weapons. The program also is responsible for the environmental legacy from, and ongoing waste management for, nuclear energy research and development, and basic science research. In an attempt to better oversee this effort, Congress required the Secretary of Energy to submit a Baseline Environmental Management Report with annual updates. The 1995 Baseline Environmental Management Report provides life-cycle cost estimates, tentative schedules, and projected activities necessary to complete the Environmental Management program

  9. Defense Systems Management Review. Volume 3, Number 2, Spring 1980. Managing the Process.

    Science.gov (United States)

    1980-01-01

    and no one did. As a result, many literally curled up and died, and for no known medical reason. Major Mayer ended a lecture on the subject with a plea...November 6, 1978. 10. Fred E. Rosell, Jr., "’ rip Report-Visit to Defense Documentation Center (DDC), May 16, 1978," Defense Systems Management College...easily expandable to splits among three or more producers. To do this for three companies, you must determine the split between Companies A and B as a

  10. Space station automation study. Automation requirements derived from space manufacturing concepts. Volume 1: Executive summary

    Science.gov (United States)

    1984-01-01

    The two manufacturing concepts developed represent innovative, technologically advanced manufacturing schemes. The concepts were selected to facilitate an in depth analysis of manufacturing automation requirements in the form of process mechanization, teleoperation and robotics, and artificial intelligence. While the cost effectiveness of these facilities has not been analyzed as part of this study, both appear entirely feasible for the year 2000 timeframe. The growing demand for high quality gallium arsenide microelectronics may warrant the ventures.

  11. Probabilistic Requirements (Partial) Verification Methods Best Practices Improvement. Variables Acceptance Sampling Calculators: Empirical Testing. Volume 2

    Science.gov (United States)

    Johnson, Kenneth L.; White, K. Preston, Jr.

    2012-01-01

    The NASA Engineering and Safety Center was requested to improve on the Best Practices document produced for the NESC assessment, Verification of Probabilistic Requirements for the Constellation Program, by giving a recommended procedure for using acceptance sampling by variables techniques as an alternative to the potentially resource-intensive acceptance sampling by attributes method given in the document. In this paper, the results of empirical tests intended to assess the accuracy of acceptance sampling plan calculators implemented for six variable distributions are presented.

  12. Determining the essential skill requirements for construction managers' practice in Nigeria

    Directory of Open Access Journals (Sweden)

    Olabode E Ogunsanmi

    2016-12-01

    Full Text Available The study investigates the essential skill requirements for construction managers in Nigeria. The objective is to determine the most important skill requirements for construction managers. A structured questionnaire was administered to construction professionals who worked recently with construction managers in their recently completed projects. Snowballing sampling technique was used to select seventy (70 respondents, however only forty (40 responses were used for the data analysis. The results indicate that essential skills required by the construction managers for their jobs include: procedural-industrial skills, quality assurance/management, listening skills, knowledge of codes and regulations, sustainable skills and ability to learn skills. These skills are important for the construction manager to practice effectively in Nigeria and other developing countries. These findings have seven practical implications to professional bodies, Universities and other trainers of construction managers, whose present curricula may be deficient in knowledge areas in industry (business, managerial, personal and technical. These institutions may need to re-orientate and improve the curricula for newly trained construction managers to cope with current skill requirements. On the other hand, recruiting agencies should ensure that job applicants with the right hard and soft skills are engaged as construction managers. Consequently efficient and effective management of future construction projects in Nigeria and other developing countries can be ensured.

  13. AAFE man-made noise experiment project. Volume 1: Introduction experiment definition and requirements

    Science.gov (United States)

    1974-01-01

    An experiment was conducted to measure and map the man-made radio frequency emanations which exist at earth orbital altitudes. The major objectives of the program are to develop a complete conceptual experiment and developmental hardware for the collection and processing of data required to produce meaningful statistics on man-made noise level variations as functions of time, frequency, and geographic location. A wide dispersion measurement receiver mounted in a spacecraft operating in a specialized orbit is used to obtain the data. A summary of the experiment designs goals and constraints is provided. The recommended orbit for the spacecraft is defined. The characteristics of the receiver and the antennas are analyzed.

  14. Space Station Furnace Facility. Volume 1: Requirements definition and conceptual design study, executive summary

    Science.gov (United States)

    1992-05-01

    The Space Station Freedom Furnace (SSFF) Study was awarded on June 2, 1989, to Teledyne Brown Engineering (TBE) to define an advanced facility for materials research in the microgravity environment of Space Station Freedom (SSF). The SSFF will be designed for research in the solidification of metals and alloys, the crystal growth of electronic and electro-optical materials, and research in glasses and ceramics. The SSFF is one of the first 'facility' class payloads planned by the Microgravity Science and Applications Division (MSAD) of the Office of Space Science and Applications of NASA Headquarters. This facility is planned for early deployment during man-tended operations of the SSF with continuing operations through the Permanently Manned Configuration (PMC). The SSFF will be built around a general 'Core' facility which provides common support functions not provided by SSF, common subsystems which are best centralized, and common subsystems which are best distributed with each experiment module. The intent of the facility approach is to reduce the overall cost associated with implementing and operating a variety of experiments. This is achieved by reducing the launch mass and simplifying the hardware development and qualification processes associated with each experiment. The Core will remain on orbit and will require only periodic maintenance and upgrading while new Furnace Modules, samples, and consumables are developed, qualified, and transported to the SSF. The SSFF Study was divided into two phases: phase 1, a definition study phase, and phase 2, a design and development phase. The definition phase 1 is addressed. Phase 1 was divided into two parts. In the first part, the basic part of the effort, covered the preliminary definition and assessment of requirements; conceptual design of the SSFF; fabrication of mockups; and the preparation for and support of the Conceptual Design Review (CoDR). The second part, the option part, covered requirements update and

  15. Next manager. Academic Background versus Labor Market Requirements

    Directory of Open Access Journals (Sweden)

    Razvan Catalin Dobrea

    2016-07-01

    Full Text Available The employability of of graduates is today one of the major problems both of universities and economical environment. Also, employability, inserting optimum professional and social life is a problem of each graduate. It finds today, that a large part of are young drop out of school and thus possibility of qualify at a high level or have difficulty entering the labor market. European Commission recommends for member states reforming education, especially of the university so as to ensure the professionalization of the young people, developing their professional skills and transversal, harnessing their potential, enhance the relevance of education for youth and the labor market. Bologna Declaration shows that employability (ability to engage, to maintain the service and mobility in the labor market is defining higher education, whose role is to familiarize students with the skills and competencies that individuals need to place on the job. (Bologna, 1999 This paper addresses the issue of employability of higher economic studies graduates, and analyzes a positive experience resulting from the provision of complex information, guidance, advice and orientation to students in POSDRU "Practice today to become manager of tomorrow". The paper presents the results of a complex study conducted on the impact that these services have had on the students involved, from three perspectives: students, employers, who guided activity students at the university level. The results show that there is a direct relationship between the increase in the number of students who have benefited from guidance, counseling and professional development appropriate to their needs and the number who have developed personal skills to substantiate decisions regarding their career paths and educational because of of information, advice, guidance provided in the project. These services have helped students to develop, to know better, know their own skills and abilities and to focus

  16. National Waste Terminal Storage Program: information management plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    A comprehensive information management plan to provide for the systematic processing of large amounts of internally prepared and externally acquired documentation that will accrue to the Office of Waste Isolation (OWI) during the next decade is outlined. The Information Management Plan of the National Waste Terminal Storage (NWTS) Program is based on time proven procedures developed by government and industry for the requirements determination, acquisition, and the administration of documentation. The NWTS Information Management Plan is designed to establish the basis for the planning, development, implemenation, operation and maintenance of the NWTS Information Management System. This plan will help assure that documentation meets required quality standards and that each organization's needs are reflected when soliciting documentation from subcontractors. An example would be the Quality Assurance documentation requirement necessary to comply with eventual NRC licensing regulations. The provisions of the NWTS Information Management Plan will apply to all documentation from OWI contractors, subcontractors, and suppliers, and to OWI organizations for documentation prepared periodically for external dissemination

  17. Corporate Data Network (CDN) data requirements task. Enterprise Model. Volume 1

    International Nuclear Information System (INIS)

    1985-11-01

    The NRC has initiated a multi-year program to centralize its information processing in a Corporate Data Network (CDN). The new information processing environment will include shared databases, telecommunications, office automation tools, and state-of-the-art software. Touche Ross and Company was contracted with to perform a general data requirements analysis for shared databases and to develop a preliminary plan for implementation of the CDN concept. The Enterprise Model (Vol. 1) provided the NRC with agency-wide information requirements in the form of data entities and organizational demand patterns as the basis for clustering the entities into logical groups. The Data Dictionary (Vol. 2) provided the NRC with definitions and example attributes and properties for each entity. The Data Model (Vol. 3) defined logical databases and entity relationships within and between databases. The Preliminary Strategic Data Plan (Vol. 4) prioritized the development of databases and included a workplan and approach for implementation of the shared database component of the Corporate Data Network

  18. Corporate Data Network (CDN). Data Requirements Task. Preliminary Strategic Data Plan. Volume 4

    International Nuclear Information System (INIS)

    1985-11-01

    The NRC has initiated a multi-year program to centralize its information processing in a Corporate Data Network (CDN). The new information processing environment will include shared databases, telecommunications, office automation tools, and state-of-the-art software. Touche Ross and Company was contracted with to perform a general data requirements analysis for shared databases and to develop a preliminary plan for implementation of the CDN concept. The Enterprise Model (Vol. 1) provided the NRC with agency-wide information requirements in the form of data entities and organizational demand patterns as the basis for clustering the entities into logical groups. The Data Dictionary (Vol.2) provided the NRC with definitions and example attributes and properties for each entity. The Data Model (Vol.3) defined logical databases and entity relationships within and between databases. The Preliminary Strategic Data Plan (Vol. 4) prioritized the development of databases and included a workplan and approach for implementation of the shared database component of the Corporate Data Network

  19. Development of Human Factor Management Requirements and Human Error Classification for the Prevention of Railway Accident

    International Nuclear Information System (INIS)

    Kwak, Sang Log; Park, Chan Woo; Shin, Seung Ryoung

    2008-08-01

    Railway accident analysis results show that accidents cased by human factors are not decreasing, whereas H/W related accidents are steadily decreasing. For the efficient management of human factors, many expertise on design, conditions, safety culture and staffing are required. But current safety management activities on safety critical works are focused on training, due to the limited resource and information. In order to improve railway safety, human factors management requirements for safety critical worker and human error classification is proposed in this report. For this accident analysis, status of safety measure on human factor, safety management system on safety critical worker, current safety planning is analysis

  20. Functional requirements for the Automated Transportation Management System: TTP number: RL 439002

    Energy Technology Data Exchange (ETDEWEB)

    Portsmouth, J.H. [Westinghouse Hanford Co., Richland, WA (United States)

    1992-12-31

    This requirements analysis, documents Department of Energy (DOE) transportation management procedures for the purpose of providing a clear and mutual understanding between users and designers of the proposed Automated Transportation Management System (ATMS). It is imperative that one understand precisely how DOE currently performs traffic management tasks; only then can an integrated system be proposed that successfully satisfies the major requirements of transportation managers and other system users. Accordingly, this report describes the current workings of DOE transportation organizations and then proposes a new system which represents a synthesis of procedures (both current and desired) which forms the basis for further systems development activities.

  1. Numerical investigation on critical heat flux and coolant volume required for transpiration cooling with phase change

    International Nuclear Information System (INIS)

    He, Fei; Wang, Jianhua

    2014-01-01

    Highlights: • Five states during the transpiration cooling are discussed. • A suit of applicable program is developed. • The variations of the thickness of two-phase region and the pressure are analyzed. • The relationship between heat flux and coolant mass flow rate is presented. • An approach is given to define the desired case of transpiration cooling. - Abstract: The mechanism of transpiration cooling with liquid phase change is numerically investigated to protect the thermal structure exposed to extremely high heat flux. According to the results of theoretical analysis, there is a lower critical and an upper critical external heat flux corresponding a certain coolant mass flow rate, between the two critical values, the phase change of liquid coolant occurs within porous structure. A strongly applicable self-edit program is developed to solve the states of fluid flow and heat transfer probably occurring during the phase change procedure. The distributions of temperature and saturation in these states are presented. The variations of the thickness of two-phase region and the pressure including capillary are analyzed, and capillary pressure is found to be the main factor causing pressure change. From the relationships between the external heat flux and coolant mass flow rate obtained at different cooling cases, an approach is given to estimate the maximal heat flux afforded and the minimal coolant consumption required by the desired case of transpiration cooling. Thus the pressure and coolant consumption required in a certain thermal circumstance can be determined, which are important in the practical application of transpiration cooling

  2. Screening assessment and requirements for a comprehensive assessment: Volume 1, Draft. Columbia River comprehensive impact assessment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-04-01

    To evaluate the impact to the Columbia River from the Hanford Site-derived contaminants, the U.S. Department of Energy, U.S. Environmental Protection Agency, and Washington State Department of Ecology initiated a study referred to as the Columbia River Comprehensive Impact Assessment (CRCIA). To address concerns about the scope and direction of CRCIA as well as enhance regulator, tribal, stockholder, and public involvement, the CRCIA Management Team was formed in August 1995. The Team agreed to conduct CRCIA using a phased approach. The initial phase, includes two components: 1) a screening assessment to evaluate the potential impact to the river, resulting from current levels of Hanford-derived contaminants in order to support decisions on Interim Remedial Measures, and 2) a definition of the essential work remaining to provide an acceptable comprehensive river impact assessment. The screening assessment is described in Part I of this report. The essential work remaining is Part II of this report. The objective of the screening assessment is to identify areas where the greatest potential exists for adverse effects on humans or the environment. Part I of this report discusses the scope, technical approach, and results of the screening assessment. Part II defines a new paradigm for predecisional participation by those affected by Hanford cleanup decisions.

  3. Screening assessment and requirements for a comprehensive assessment: Volume 1, Draft. Columbia River comprehensive impact assessment

    International Nuclear Information System (INIS)

    1997-04-01

    To evaluate the impact to the Columbia River from the Hanford Site-derived contaminants, the U.S. Department of Energy, U.S. Environmental Protection Agency, and Washington State Department of Ecology initiated a study referred to as the Columbia River Comprehensive Impact Assessment (CRCIA). To address concerns about the scope and direction of CRCIA as well as enhance regulator, tribal, stockholder, and public involvement, the CRCIA Management Team was formed in August 1995. The Team agreed to conduct CRCIA using a phased approach. The initial phase, includes two components: 1) a screening assessment to evaluate the potential impact to the river, resulting from current levels of Hanford-derived contaminants in order to support decisions on Interim Remedial Measures, and 2) a definition of the essential work remaining to provide an acceptable comprehensive river impact assessment. The screening assessment is described in Part I of this report. The essential work remaining is Part II of this report. The objective of the screening assessment is to identify areas where the greatest potential exists for adverse effects on humans or the environment. Part I of this report discusses the scope, technical approach, and results of the screening assessment. Part II defines a new paradigm for predecisional participation by those affected by Hanford cleanup decisions

  4. Data requirements and maintenance of records for spent fuel management: A review

    International Nuclear Information System (INIS)

    2006-11-01

    Data collection and maintenance are an essential part of activities required in the lifetime management of spent fuel. Key data on spent fuel are required from the earliest phase of any project. To allow informed decisions for spent fuel management to be made, the data need to be maintained throughout the lifetime of spent fuel management including storage, transport, reprocessing or disposal. This publication is intended to provide a state-of-the-art review of spent fuel data management, including what data need to be gathered for the relevant activities in spent fuel management and how to maintain them by the responsible bodies at various stages of the nuclear fuel cycle. It provides some insights on a rational approach to spent fuel data management, considering the common requirements involved in spent fuel management for any Member State. In this regard, the information provided in these sections is mostly generic. After the introductory Section 1 and the Section 2 on data requirements for spent fuel management, Section 3 examines technical parameters that could specify spent fuel characteristics and associated conditions, followed by Section 4 on life cycle management of spent fuel data which includes the maintenance of records and other issues. Finally, some specific examples of the approaches already developed by a number of utilities and national organisations to characterise and track their spent-fuel data are presented in the Annex

  5. Requirements for the project management in the client / engineering contractor relationship

    International Nuclear Information System (INIS)

    Hack, W.L.

    1995-01-01

    Investment projects impose a multitude of requirements upon clients and engineering contractors to cope with the management of project inherent conflicts. The paper reviews certain aspects on why such conflicts develop, and how they may be resolved. (orig.)

  6. Technical Meeting on Grading of the Application of Management System Requirements. Presentations

    International Nuclear Information System (INIS)

    2012-01-01

    The objectives of this Technical Meeting are threefold: - to share international experiences and lessons learned, as well as exchange views on best practices and strategies to overcome the difficulties encountered; - to review and discuss the draft technical report on 'Grading the Application of Management System Requirements, to allow the participants to contribute to the improvement of the document and to enrich it with practical examples; and - to strengthen the international networking of specialists in the field. The topics covered during the meeting will include: - Examples and case studies presented by participants from countries with nuclear facilities (mainly focused on NPPs, and, where appropriate, from research reactors, fuel cycle and waste management facilities) on grading the application of management system requirements and lessons learned. - Reviewing and improving the final draft of a technical report on 'Grading the Application of Management System Requirements', which will supersede the previous guidance: Grading of Quality Assurance Requirement: A Manual (Technical Reports Series No. 328)

  7. Lithuanian requirements for ageing management of systems and components important to safety of nuclear power plant

    International Nuclear Information System (INIS)

    Ramanauskiene, A.

    2000-01-01

    In this paper the Lithuanian requirements for ageing management of systems and components important to safety of Ignalina nuclear power plant (two RBMK-1500 water-cooled graphite moderated channel-type power reactors) are presented

  8. Southwest Project: resource/institutional requirements analysis. Volume II. Technical studies

    Energy Technology Data Exchange (ETDEWEB)

    Ormsby, L. S.; Sawyer, T. G.; Brown, Dr., M. L.; Daviet, II, L. L.; Weber, E. R.; Brown, J. E.; Arlidge, J. W.; Novak, H. R.; Sanesi, Norman; Klaiman, H. C.; Spangenberg, Jr., D. T.; Groves, D. J.; Maddox, J. D.; Hayslip, R. M.; Ijams, G.; Lacy, R. G.; Montgomery, J.; Carito, J. A.; Ballance, J. W.; Bluemle, C. F.; Smith, D. N.; Wehrey, M. C.; Ladd, K. L.; Evans, Dr., S. K.; Guild, D. H.; Brodfeld, B.; Cleveland, J. A.; Hicks, K. L.; Noga, M. W.; Ross, A. M.

    1979-12-01

    The project provides information which could be used to accelerate the commercialization and market penetration of solar electric generation plants in the southwestern region of the United States. The area of concern includes Arizona, California, Colorado, Nevada, New Mexico, Utah, and sections of Oklahoma and Texas. The project evaluated the potential integration of solar electric generating facilities into the existing electric grids of the region through the year 2000. The technologies included wind energy conversion, solar thermal electric, solar photovoltaic conversion, and hybrid solar electric systems. Each of the technologies considered, except hybrid solar electric, was paired with a compatible energy storage system to improve plant performance and enhance applicability to a utility grid system. The hybrid concept utilizes a conventionally-fueled steam generator as well as a solar steam generator so it is not as dependent upon the availability of solar energy as are the other concepts. Operation of solar electric generating plants in conjunction with existing hydroelectric power facilities was also studied. The participants included 12 electric utility companies and a state power authority in the southwestern US, as well as a major consulting engineering firm. An assessment of the state-of-the-art of solar electric generating plants from an electric utility standpoint; identification of the electric utility industry's technical requirements and considerations for solar electric generating plants; estimation of the capital investment, operation, and maintenance costs for solar electric generating plants; and determination of the capital investment of conventional fossil and nuclear electric generating plants are presented. (MCW)

  9. Study Results on Knowledge Requirements for Entry-Level Airport Operations and Management Personnel

    Science.gov (United States)

    Quilty, Stephen M.

    2005-01-01

    This paper identifies important topical knowledge areas required of individuals employed in airport operations and management positions. A total of 116 airport managers and airfield operations personnel responded to a survey that sought to identify the importance of various subject matter for entry level airport operations personnel. The results from this study add to the body of research on aviation management curriculum development and can be used to better develop university curriculum and supplemental training focused on airport management and operations. Recommendations are made for specialized airport courses within aviation management programs. Further, this study identifies for job seekers or individuals employed in entry level positions those knowledge requirements deemed important by airport managers and operations personnel at different sized airports.

  10. Space Transportation System Cargo projects: inertial stage/spacecraft integration plan. Volume 1: Management plan

    Science.gov (United States)

    1981-01-01

    The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.

  11. Employers' Perceptions of Information Technology Competency Requirements for Management Accounting Graduates

    Science.gov (United States)

    Spraakman, Gary; O'Grady, Winifred; Askarany, Davood; Akroyd, Chris

    2015-01-01

    Management accountants work in a computerized workplace with information technology (IT) for producing financial ledgers and for reporting. Thus, the role of the management accountant has shifted from capturing and recording transactions to analyzing business issues. The research question is: what IT knowledge and skills do employers require of…

  12. Requirements for a systems-based research and development management process in transport infrastructure engineering

    CSIR Research Space (South Africa)

    Rust, FC

    2015-05-01

    Full Text Available are not suitable for the management of such multi-disciplinary projects. This study focuses on determining the key characteristics required for a systems-based approach to the management of R&D projects. The information and data was compiled from literature reviews...

  13. CPP-603 Underwater Fuel Storage Facility Site Integrated Stabilization Management Plan (SISMP), Volume I

    International Nuclear Information System (INIS)

    Denney, R.D.

    1995-10-01

    The CPP-603 Underwater Fuel Storage Facility (UFSF) Site Integrated Stabilization Management Plan (SISMP) has been constructed to describe the activities required for the relocation of spent nuclear fuel (SNF) from the CPP-603 facility. These activities are the only Idaho National Engineering Laboratory (INEL) actions identified in the Implementation Plan developed to meet the requirements of the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 to the Secretary of Energy regarding an improved schedule for remediation in the Defense Nuclear Facilities Complex. As described in the DNFSB Recommendation 94-1 Implementation Plan, issued February 28, 1995, an INEL Spent Nuclear Fuel Management Plan is currently under development to direct the placement of SNF currently in existing INEL facilities into interim storage, and to address the coordination of intrasite SNF movements with new receipts and intersite transfers that were identified in the DOE SNF Programmatic and INEL Environmental Restoration and Waste Management Environmental Impact Statement Record, of Decision. This SISMP will be a subset of the INEL Spent Nuclear Fuel Management Plan and the activities described are being coordinated with other INEL SNF management activities. The CPP-603 relocation activities have been assigned a high priority so that established milestones will be meet, but there will be some cases where other activities will take precedence in utilization of available resources. The Draft INEL Site Integrated Stabilization Management Plan (SISMP), INEL-94/0279, Draft Rev. 2, dated March 10, 1995, is being superseded by the INEL Spent Nuclear Fuel Management Plan and this CPP-603 specific SISMP

  14. Electronic document management meets environmental restoration recordkeeping requirements: A case study

    International Nuclear Information System (INIS)

    Burnham, S.L.

    1995-01-01

    Efforts at migrating records management at five Department of Energy sites operated under management by Lockheed Martin Energy Systems, Inc. for Environmental Restoration (ER) business activities are described. The corporate environment, project definition, records keeping requirements are described first. Then an evaluation of electronic document management technologies and of internal and commercially available systems are provided. Finally adopted incremental implementation strategy and lessons learned are discussed

  15. Technology requirements to be addressed by the NASA Lewis Research Center Cryogenic Fluid Management Facility program

    Science.gov (United States)

    Aydelott, J. C.; Rudland, R. S.

    1985-01-01

    The NASA Lewis Research Center is responsible for the planning and execution of a scientific program which will provide advance in space cryogenic fluid management technology. A number of future space missions were identified that require or could benefit from this technology. These fluid management technology needs were prioritized and a shuttle attached reuseable test bed, the cryogenic fluid management facility (CFMF), is being designed to provide the experimental data necessary for the technology development effort.

  16. Reengineering of waste management at the Oak Ridge National Laboratory. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    Myrick, T.E.

    1997-08-01

    A reengineering evaluation of the waste management program at the Oak Ridge National Laboratory (ORNL) was conducted during the months of February through July 1997. The goal of the reengineering was to identify ways in which the waste management process could be streamlined and improved to reduce costs while maintaining full compliance and customer satisfaction. A Core Team conducted preliminary evaluations and determined that eight particular aspects of the ORNL waste management program warranted focused investigations during the reengineering. The eight areas included Pollution Prevention, Waste Characterization, Waste Certification/Verification, Hazardous/Mixed Waste Stream, Generator/WM Teaming, Reporting/Records, Disposal End Points, and On-Site Treatment/Storage. The Core Team commissioned and assembled Process Teams to conduct in-depth evaluations of each of these eight areas. The Core Team then evaluated the Process Team results and consolidated the 80 process-specific recommendations into 15 overall recommendations. Volume 2 consists of nine appendices which contain the Process Team reports and Benchmarking reports.

  17. Final environmental impact statement. Management of commercially generated radioactive waste. Volume 2. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    1980-10-01

    This EIS analyzes the significant environmental impacts that could occur if various technologies for management and disposal of high-level and transuranic wastes from commercial nuclear power reactors were to be developed and implemented. This EIS will serve as the environmental input for the decision on which technology, or technologies, will be emphasized in further research and development activities in the commercial waste management program. The action proposed in this EIS is to (1) adopt a national strategy to develop mined geologic repositories for disposal of commercially generated high-level and transuranic radioactive waste (while continuing to examine subseabed and very deep hole disposal as potential backup technologies) and (2) conduct a R and D program to develop such facilities and the necessary technology to ensure the safe long-term containment and isolation of these wastes. The Department has considered in this statement: development of conventionally mined deep geologic repositories for disposal of spent fuel from nuclear power reactors and/or radioactive fuel reprocessing wastes; balanced development of several alternative disposal methods; and no waste disposal action. This volume contains appendices of supplementary data on waste management systems, geologic disposal, radiological standards, radiation dose calculation models, related health effects, baseline ecology, socio-economic conditions, hazard indices, comparison of defense and commercial wastes, design considerations, and wastes from thorium-based fuel cycle alternatives. (DMC)

  18. Reengineering of waste management at the Oak Ridge National Laboratory. Volume 2

    International Nuclear Information System (INIS)

    Myrick, T.E.

    1997-08-01

    A reengineering evaluation of the waste management program at the Oak Ridge National Laboratory (ORNL) was conducted during the months of February through July 1997. The goal of the reengineering was to identify ways in which the waste management process could be streamlined and improved to reduce costs while maintaining full compliance and customer satisfaction. A Core Team conducted preliminary evaluations and determined that eight particular aspects of the ORNL waste management program warranted focused investigations during the reengineering. The eight areas included Pollution Prevention, Waste Characterization, Waste Certification/Verification, Hazardous/Mixed Waste Stream, Generator/WM Teaming, Reporting/Records, Disposal End Points, and On-Site Treatment/Storage. The Core Team commissioned and assembled Process Teams to conduct in-depth evaluations of each of these eight areas. The Core Team then evaluated the Process Team results and consolidated the 80 process-specific recommendations into 15 overall recommendations. Volume 2 consists of nine appendices which contain the Process Team reports and Benchmarking reports

  19. Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 2

    International Nuclear Information System (INIS)

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. To address the facility-specific and site-specific vulnerabilities, responsible DOE and site-contractor line organizations have developed initial site response plans. These plans, presented as Volume 2 of this Management Response Plan, describe the actions needed to mitigate or eliminate the facility- and site-specific vulnerabilities identified by the CSV Working Group field verification teams. Initial site response plans are described for: Brookhaven National Lab., Hanford Site, Idaho National Engineering Lab., Lawrence Livermore National Lab., Los Alamos National Lab., Oak Ridge Reservation, Rocky Flats Plant, Sandia National Laboratories, and Savannah River Site

  20. Final environmental impact statement. Management of commercially generated radioactive waste. Volume 2. Appendices

    International Nuclear Information System (INIS)

    1980-10-01

    This EIS analyzes the significant environmental impacts that could occur if various technologies for management and disposal of high-level and transuranic wastes from commercial nuclear power reactors were to be developed and implemented. This EIS will serve as the environmental input for the decision on which technology, or technologies, will be emphasized in further research and development activities in the commercial waste management program. The action proposed in this EIS is to (1) adopt a national strategy to develop mined geologic repositories for disposal of commercially generated high-level and transuranic radioactive waste (while continuing to examine subseabed and very deep hole disposal as potential backup technologies) and (2) conduct a R and D program to develop such facilities and the necessary technology to ensure the safe long-term containment and isolation of these wastes. The Department has considered in this statement: development of conventionally mined deep geologic repositories for disposal of spent fuel from nuclear power reactors and/or radioactive fuel reprocessing wastes; balanced development of several alternative disposal methods; and no waste disposal action. This volume contains appendices of supplementary data on waste management systems, geologic disposal, radiological standards, radiation dose calculation models, related health effects, baseline ecology, socio-economic conditions, hazard indices, comparison of defense and commercial wastes, design considerations, and wastes from thorium-based fuel cycle alternatives

  1. Development of CSA N1600-14: general requirements for nuclear emergency management programs

    Energy Technology Data Exchange (ETDEWEB)

    Sellar, C. [Canadian Standards Association Group, Mississauga, ON (Canada); Coles, J. [Ontario Power Generation, Darlington, ON (Canada)

    2014-07-01

    CSA Group has published a new standard on General requirements for nuclear emergency management programs (CSA N1600-14). The standard establishes criteria for the emergency management programs of on- and off-site organizations to address nuclear emergencies at Canadian nuclear power plants (NPPs). It provides the requirements to develop, implement, evaluate, maintain, and continuously improve a nuclear emergency management program for prevention and mitigation, preparedness, response, and recovery from a nuclear emergency at a NPP. This paper discusses the development of the standard, and provides the key drivers, structure, scope, and outline of the standard, while highlighting key features, impacts, and benefits. (author)

  2. Recommended Skill Requirements of Recent Management Information Systems Graduates for Employment: A Modified Delphi Study

    Science.gov (United States)

    Strnad, Michael A., Sr.

    2013-01-01

    The purpose of this Modified Delphi study was to achieve a consensus and forecast a prediction from expert IT hiring managers on what skills are required of MIS graduates for employment. In doing so, guidance could be provided to academic leaders who design curricula for MIS students on the required skills for employment. This study was conducted…

  3. Teaching Management Information Systems as a General Education Requirement (GER) Capstone

    Science.gov (United States)

    Hoanca, Bogdan

    2012-01-01

    Although many IS programs nationwide use capstone courses in the major, this paper reports on the use of an upper division Management Information Systems (MIS) class as a general education requirements (GER) capstone. The class is a core requirement for all majors in the Bachelor of Business Administration (BBA) program at the University of Alaska…

  4. An Exploration of the Professional Competencies Required in Engineering Asset Management

    Science.gov (United States)

    Bish, Adelle J.; Newton, Cameron J.; Browning, Vicky; O'Connor, Peter; Anibaldi, Renata

    2014-01-01

    Engineering asset management (EAM) is a rapidly growing and developing field. However, efforts to select and develop engineers in this area are complicated by our lack of understanding of the full range of competencies required to perform. This exploratory study sought to clarify and categorise the professional competencies required of individuals…

  5. Alternatives for managing wastes from reactors and post-fission operations in the LWR fuel cycle. Volume 5. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    1976-05-01

    Volume V of the five-volume report consists of appendices, which provide supplementary information, with emphasis on characteristics of geologic formations that might be used for final storage or disposal. Appendix titles are: selected glossary; conversion factors; geologic isolation, including, (a) site selection factors for repositories of wastes in geologic media, (b) rock types--geologic occurrence, (c) glossary of geohydrologic terms, and (d) 217 references; the ocean floor; and, government regulations pertaining to the management of radioactive materials. (JGB)

  6. Alternatives for managing wastes from reactors and post-fission operations in the LWR fuel cycle. Volume 5. Appendices

    International Nuclear Information System (INIS)

    1976-05-01

    Volume V of the five-volume report consists of appendices, which provide supplementary information, with emphasis on characteristics of geologic formations that might be used for final storage or disposal. Appendix titles are: selected glossary; conversion factors; geologic isolation, including, (a) site selection factors for repositories of wastes in geologic media, (b) rock types--geologic occurrence, (c) glossary of geohydrologic terms, and (d) 217 references; the ocean floor; and, government regulations pertaining to the management of radioactive materials

  7. Standard requirements for GCP-compliant data management in multinational clinical trials

    LENUS (Irish Health Repository)

    Ohmann, Christian

    2011-03-22

    Abstract Background A recent survey has shown that data management in clinical trials performed by academic trial units still faces many difficulties (e.g. heterogeneity of software products, deficits in quality management, limited human and financial resources and the complexity of running a local computer centre). Unfortunately, no specific, practical and open standard for both GCP-compliant data management and the underlying IT-infrastructure is available to improve the situation. For that reason the "Working Group on Data Centres" of the European Clinical Research Infrastructures Network (ECRIN) has developed a standard specifying the requirements for high quality GCP-compliant data management in multinational clinical trials. Methods International, European and national regulations and guidelines relevant to GCP, data security and IT infrastructures, as well as ECRIN documents produced previously, were evaluated to provide a starting point for the development of standard requirements. The requirements were produced by expert consensus of the ECRIN Working group on Data Centres, using a structured and standardised process. The requirements were divided into two main parts: an IT part covering standards for the underlying IT infrastructure and computer systems in general, and a Data Management (DM) part covering requirements for data management applications in clinical trials. Results The standard developed includes 115 IT requirements, split into 15 separate sections, 107 DM requirements (in 12 sections) and 13 other requirements (2 sections). Sections IT01 to IT05 deal with the basic IT infrastructure while IT06 and IT07 cover validation and local software development. IT08 to IT015 concern the aspects of IT systems that directly support clinical trial management. Sections DM01 to DM03 cover the implementation of a specific clinical data management application, i.e. for a specific trial, whilst DM04 to DM12 address the data management of trials across the unit

  8. National Low-Level Waste Management Program radionuclide report series. Volume 2, Niobium-94

    International Nuclear Information System (INIS)

    Adams, J.P.; Carboneau, M.L.

    1995-04-01

    The Purpose of the National Low-Level Waste Management Program Radionuclide Report Series is to provide information to, state representatives and developers of low-level radioactive waste disposal facilities about the radiological chemical, and physical characteristics of selected radionuclides and their behavior in the low-level radioactive waste disposal facility environment. Extensive surveys of available literature provided information used to produce this series of reports and an introductory report. This report is Volume 11 of the series. It outlines the basic radiological, chemical, and physical characteristics of niobium-94, waste types and forms that contain it, and its behavior in environmental media such as soils, plants, groundwater, air, animals and the human body

  9. Aging Management Strategy and Requirements of Pressurized Water Reactor Internal Components

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Jun Seog; Oh, Sung Jin; Won, Se Yol; Jeong, Sun Mi [KHNP, Daejeon (Korea, Republic of)

    2016-05-15

    The demonstration that the effects of degradation in the components of PWR internals are adequately managed is essential for maintaining a healthy fleet and ensuring the continued functionality of the reactor internals. It is also very important to determine when and where irradiation susceptibility may occur for the continued operation. This paper introduces the aging management strategies and requirements for PWR internals components and discusses effects of irradiation aging results from the functionality assessments based on the categorization of internal components. This paper introduces aging management strategies and requirements for PWR internals components. The aging management requirements for PWR internals are specified in four final component groups, which are Primary, Expansion, Existing Program and No Additional Measures. Among these groups, Primary groups include any restriction on general applicability, degradation mechanism, forward link to any Expansion components, examination method, initial examination and frequency, and examination coverage and accessibility. Expansion groups are backward link to the Primary component.

  10. San Juan National Forest Land Management Planning Support System (LMPSS) requirements definition

    Science.gov (United States)

    Werth, L. F. (Principal Investigator)

    1981-01-01

    The role of remote sensing data as it relates to a three-component land management planning system (geographic information, data base management, and planning model) can be understood only when user requirements are known. Personnel at the San Juan National Forest in southwestern Colorado were interviewed to determine data needs for managing and monitoring timber, rangelands, wildlife, fisheries, soils, water, geology and recreation facilities. While all the information required for land management planning cannot be obtained using remote sensing techniques, valuable information can be provided for the geographic information system. A wide range of sensors such as small and large format cameras, synthetic aperture radar, and LANDSAT data should be utilized. Because of the detail and accuracy required, high altitude color infrared photography should serve as the baseline data base and be supplemented and updated with data from the other sensors.

  11. Efficacy of lung volume optimization maneuver monitored by optoelectronic pletismography in the management of congenital diaphragmatic hernia

    Directory of Open Access Journals (Sweden)

    G. Lista

    2017-01-01

    We report a case of left CDH with severe lung hypoplasia, managed applying open lung strategy in HFOV (pre-surgery period and in Assist-Control with Volume Guarantee (post-surgery period, guided by SpO2 changes, TcPO2 and TcPCO2 monitoring. Opto-electronic plethysmography was used to measure end-expiratory chest wall volume changes (ΔEEcw related to lung volume variations occurring during pressure changes. OEP confirmed the efficacy of using SpO2 and transcutaneous gas monitoring during this recruitment maneuver.

  12. Defense Science Board 2006 Summer Study on Information Management for Net-Centric Operations. Volume 1: Main Report

    National Research Council Canada - National Science Library

    Schneider, Jr, William

    2007-01-01

    The task force addressed combat operations, information management, information assurance, and architecture requirements, as well as the architecture framework currently being pursued by the department...

  13. Applicability of SREM to the Verification of Management Information System Software Requirements. Volume II.

    Science.gov (United States)

    1981-04-30

    HRNUCFSSI𔃾G Fq404 ANY OTr1E4 1tOU )EIES OD.CISiJA TAOLES. T.iEr.FUrt9 LJ.31C CONTa~iE) IN T-~3~. U~LT.S HA:S NUT tEEN I t..LEM1NTci) t5CAUiSr. rn.- UPt...8217: PA6i.H 712 TtACE~ TU SJ~sN-tT: -oOCE.,S..TAK.SE.CtCK TOJHLL- EP r-4: MUJM-0.79 I 0)EN 7IF IE~S -C.𔃽- 10,4 PkC-iS I NV0RENCtl: FUCK _.o~T I 4LI S~ufCLEA

  14. Information management systems for integrating the technical data and regulatory requirements of environmental restoration activities

    International Nuclear Information System (INIS)

    Geffen, C.A.; Garrett, B.A.; Walter, M.B.

    1990-03-01

    Current environmental regulations require that comprehensive planning be conducted before remediating a hazardous waste site to characterize the nature and extent of site contamination, calculate the risk to the public, and assess the effectiveness of various remediation technologies. Remediation of Department of Energy (DOE) sites contaminated with hazardous or mixed wastes will require the effective integration of scientific and engineering data with regulatory and institutional requirements. The information management challenge presented by waste site cleanup activities goes beyond merely dealing with the large quantity of data that will be generated. The information must be stored, managed, and presented in a way that provides some consistency in approach across sites, avoids duplication of effort, and facilitates responses to requests for information from the regulators and the public. This paper provides background information on the regulatory requirements for data gathering and analysis for environmental restoration activities, and outlines the data and information management requirements for completing the pre-remediation phases of an environmental restoration project. Information management systems for integrating the regulatory and institutional requirements of the environmental restoration process with the technical data and analysis requirements are also described. 7 refs

  15. UNDERSTANDING THAI CULTURE AND ITS IMPACT ON REQUIREMENTS ENGINEERING PROCESS MANAGEMENT DURING INFORMATION SYSTEMS DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    Theerasak Thanasankit

    2002-01-01

    Full Text Available This paper explores the impact of Thai culture on managing the decision making process in requirements engineering and contribution a better understand of its influence on the management of requirements engineering process. The paper illustrates the interaction of technology and culture and shows that rather than technology changing culture, culture can change the way technology is used. Thai culture is naturally inherent in Thai daily life and Thais bring that into their work practices. The concepts of power and uncertainty in Thai culture contribute toward hierarchical forms of communication and decision making process in Thailand, especially during requirements engineering, where information systems requirements need to be established for further development. The research shows that the decision making process in Thailand tends to take a much longer time, as every stage during requirements engineering needs to be reported to management for final decisions. The tall structure of Thai organisations also contributes to a bureaucratic, elongated decision-making process during information systems development. Understanding the influence of Thai culture on requirements engineering and information systems development will assist multinational information systems consulting organisations to select, adapt, better manage, or change requirements engineering process and information systems developments methodologies to work best with Thai organisations.

  16. Improving groundwater management in rural India using simple modeling tools with minimal data requirements

    Science.gov (United States)

    Moysey, S. M.; Oblinger, J. A.; Ravindranath, R.; Guha, C.

    2008-12-01

    shortly after the start of the monsoon and villager water use is small compared to the other fluxes. Groundwater fluxes were accounted for by conceptualizing the contributing areas upstream and downstream of the reservoir as one dimensional flow tubes. This description of the flow system allows for the definition of physically-based parameters making the model useful for investigating WHS infiltration under a variety of management scenarios. To address concerns regarding the uniqueness of the model parameters, 10,000 independent model calibrations were performed using randomly selected starting parameters. Based on this Monte Carlo analysis, it was found that the mean volume of water contributed by the WHS to infiltration over the study period (Sept.-Dec., 2007) was 48.1x103m3 with a 95% confidence interval of 43.7-53.7x103m3. This volume represents 17-21% of the total natural groundwater recharge contributed by the entire watershed, which was determined independently using a surface water balance. Despite the fact that the model is easy to use and requires minimal data, the results obtained provide a powerful quantitative starting point for managing groundwater withdrawals in the dry season.

  17. 17 CFR 210.3-18 - Special provisions as to registered management investment companies and companies required to be...

    Science.gov (United States)

    2010-04-01

    ... registered management investment companies and companies required to be registered as management investment... Financial Statements § 210.3-18 Special provisions as to registered management investment companies and companies required to be registered as management investment companies. (a) For filings by registered...

  18. The Identification and Comparison of the Requirements Placed on Product Managers during the Recruitment Process

    Directory of Open Access Journals (Sweden)

    Wroblowská Zuzana

    2015-09-01

    Full Text Available The submitted paper focuses on personality traits and behavioural competencies of a key role bearer in product oriented marketing management, generally referred to as product management. An interdisciplinary approach was applied while looking into this subject, since both research into theoretical bases and analysis of the current state of the topic and the tendencies of its development required work in several fields of study. Based on research in the field of secondary data, the assumption was set that a product manager is an example of a knowledge worker of the 21st century and that the business practice sees him/her as such, which has an effect on the requirements a candidate for this position is confronted with in the recruitment process. An independent research project was carried out and it confirmed that product managers are considered to be knowledge workers and that independence and analytical thinking skills were among the most common requirements for product managers both in 2007 and 2014. A comparison of results from 2007 and 2014 also showed some differences. The statistical verification confirmed a shift in requirements within the interpersonal competency group. The findings were used to formulate recommendations for the recruitment strategy and realization of selection for positions in product management.

  19. The Fukushima Dai Ichi accident. The narrative of the plant manager. Volume 2 - Alone

    International Nuclear Information System (INIS)

    Guarnieri, Franck; Travadel, Sebastien; Martin, Christophe; Portelli, Aurelien; Afrouss, Aissame; Przyswa, Eric

    2016-05-01

    This book is the second volume of a commented translation of the narrative made by the manager of the Fukushima nuclear plant to the inquiry commission after the accident. It addresses the struggle against a nuclear installation free of any control and safety devices, and also the roles, attitudes and behaviours of Tepco executives and experts, of Japanese self-defence forces, and of the Japanese Prime minister. It notably appears that the team which stayed there to face the crisis had diverging and evolving ideas of the reactors due to their lack of electricity and of data, and thus remained in a constant uncertainty about the actual condition of the four reactors, and about possible actions and their possible success. Away from the plant, Tepco executives, experts and managers could not understand and admit this total loss of control, and cannot cope with system failures. Political authorities had no contact with this reality and do not trust information. Finally, control authorities were totally absent

  20. Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 1

    International Nuclear Information System (INIS)

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. Volume 1 contains a discussion of the chemical safety improvements planned or already underway at DOE sites to correct facility or site-specific vulnerabilities. The main part of the report is a discussion of each of the programmatic deficiencies; a description of the tasks to be accomplished; the specific actions to be taken; and the organizational responsibilities for implementation

  1. Environmental fate model for ultra-low-volume insecticide applications used for adult mosquito management

    Science.gov (United States)

    Schleier, Jerome J.; Peterson, Robert K.D.; Irvine, Kathryn M.; Marshall, Lucy M.; Weaver, David K.; Preftakes, Collin J.

    2012-01-01

    One of the more effective ways of managing high densities of adult mosquitoes that vector human and animal pathogens is ultra-low-volume (ULV) aerosol applications of insecticides. The U.S. Environmental Protection Agency uses models that are not validated for ULV insecticide applications and exposure assumptions to perform their human and ecological risk assessments. Currently, there is no validated model that can accurately predict deposition of insecticides applied using ULV technology for adult mosquito management. In addition, little is known about the deposition and drift of small droplets like those used under conditions encountered during ULV applications. The objective of this study was to perform field studies to measure environmental concentrations of insecticides and to develop a validated model to predict the deposition of ULV insecticides. The final regression model was selected by minimizing the Bayesian Information Criterion and its prediction performance was evaluated using k-fold cross validation. Density of the formulation and the density and CMD interaction coefficients were the largest in the model. The results showed that as density of the formulation decreases, deposition increases. The interaction of density and CMD showed that higher density formulations and larger droplets resulted in greater deposition. These results are supported by the aerosol physics literature. A k-fold cross validation demonstrated that the mean square error of the selected regression model is not biased, and the mean square error and mean square prediction error indicated good predictive ability.

  2. Management of Diabetes Associated with Nephrotic Syndrome: Therapeutic Potential of Dapagliflozin for Protracted Volume Retention

    Directory of Open Access Journals (Sweden)

    Toshimi Imai

    2015-01-01

    Full Text Available A 48-year-old female was admitted to our hospital presenting with a chief complaint of progressive swelling because of diabetic nephrotic syndrome. Dapagliflozin seemed to play a role in accelerating the patient's urinary sodium excretion as well as reducing gross fluid retention despite the fact that her nephrotic condition was resistant to furosemide. Our experience emphasizes a potential novel approach to overcoming loop diuretic resistance using this agent among some subsets of type 2 diabetic subjects complicated with severe volume accumulation. We believe that combination treatment consisting of dapagliflozin and furosemide may produce diuretic synergy via sequential nephron blockade. The accumulation of more experience with additional cases similar to ours requires continuous and careful attention.

  3. 1980 survey and evaluation of utility conservation, load management, and solar end-use projects. Volume 3: utility load management projects. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    The results of the 1980 survey of electric utility-sponsored energy conservation, load management, and end-use solar energy conversion projects are described. The work is an expansion of a previous survey and evaluation and has been jointly sponsored by EPRI and DOE through the Oak Ridge National Laboratory. There are three volumes and a summary document. Each volume presents the results of an extensive survey to determine electric utility involvement in customer-side projects related to the particular technology (i.e., conservation, solar, or load management), selected descriptions of utility projects and results, and first-level technical and economic evaluations.

  4. Health services management development: what formal knowledge should support the skills and experience required?

    Science.gov (United States)

    Ritchie, David J; Yen, Margaret L

    2013-05-01

    This study reports on an analysis of 17 postgraduate programs in health services management. Public information was collected from websites in February 2010. Data analysed included core subject abstracts, admission requirements and length and aims of each course. Findings indicate that only three out of 16 subjects identified as core are common to more than 50% of the programs, with the eight most common individual subjects appearing in only a third of programs. This suggests diversity in what is deemed core foundational knowledge in managing health services and the approach taken to management development. We believe there should be greater consensus on core subjects in a specialist health services management qualification. WHAT IS KNOWN ABOUT THE TOPIC? With changes in the organisational structure of health organisations in Australia over the past two decades, managerial positions and roles have also changed. The educational preparation for those managerial roles would also be expected to have changed but core foundational knowledge should remain similar between the various academic institutions.WHAT DOES THIS PAPER ADD? This paper indicates greater diversity in core knowledge areas in health services management education than expected despite a similar target audience.WHAT ARE THE IMPLICATIONS FOR PRACTITIONERS? There are differences in what are deemed to be core foundational areas of knowledge required in specialist management development between academic programs. Management development requires a balance between knowledge, skills and experience and intending st

  5. Identifying environmental safety and health requirements for the Fernald Environmental Restoration Management Corporation

    International Nuclear Information System (INIS)

    Beckman, W.H.; Cossel, S.C.; Alhadeff, N.; Lindamood, S.B.; Beers, J.A.

    1994-01-01

    This presentation will describe the Fernald Environmental Restoration Management Corporation's (FERMCO) Standards/Requirements Identification Documents (S/RlDs) Program, the unique process used to implement it, and the status of the program. We will also discuss the lessons learned as the program was implemented. The Department of Energy (DOE) established the Fernald site to produce uranium metals for the nation's defense programs in 1953. In 1989, DOE suspended production and, in 1991, the mission of the site was formally changed to one of environmental cleanup and restoration. The site was renamed the Fernald Environmental Management Project (FEMP). FERMCO's mission is to provide safe, early, and least-cost final clean-up of the site in compliance with all regulations and commitments. DOE has managed nuclear facilities primarily through its oversight of Management and Operating contractors. Comprehensive nuclear industry standards were absent when most DOE sites were first established, Management and Operating contractors had to apply existing non-nuclear industry standards and, in many cases, formulate new technical standards. Because it was satisfied with the operation of its facilities, DOE did not incorporate modern practices and standards as they became available. In March 1990, the Defense Nuclear Facilities Safety Board issued Recommendation 90-2, which called for DOE to identify relevant standards and requirements, conduct adequacy assessments of requirements in protecting environmental, public, and worker health and safety, and determine the extent to which the requirements are being implemented. The Environmental Restoration and Waste Management Office of DOE embraced the recommendation for facilities under its control. Strict accountability requirements made it essential that FERMCO and DOE clearly identify applicable requirements necessary, determine the requirements' adequacy, and assess FERMCO's level of compliance

  6. Requirements for Participative Management as a Source of Sustainable Competitive Advantage and Tipical Management Method

    Directory of Open Access Journals (Sweden)

    Muscalu Emanoil

    2015-12-01

    Full Text Available The economic context in the recent years has undergone major changes in modern methods and techniques used in management. The current competitive environment is characterized by permanent turbulences influencing firstly the managerial act itself. Out of the many methods and techniques applied so far, some turn out to be less adaptable to the current economic and social context.

  7. Data summary of municipal solid waste management alternatives. Volume 3, Appendix A: Mass burn technologies

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-10-01

    This appendix on Mass Burn Technologies is the first in a series designed to identify, describe and assess the suitability of several currently or potentially available generic technologies for the management of municipal solid waste (MSW). These appendices, which cover eight core thermoconversion, bioconversion and recycling technologies, reflect public domain information gathered from many sources. Representative sources include: professional journal articles, conference proceedings, selected municipality solid waste management plans and subscription technology data bases. The information presented is intended to serve as background information that will facilitate the preparation of the technoeconomic and life cycle mass, energy and environmental analyses that are being developed for each of the technologies. Mass burn has been and continues to be the predominant technology in Europe for the management of MSW. In the United States, the majority of the existing waste-to-energy projects utilize this technology and nearly 90 percent of all currently planned facilities have selected mass burn systems. Mass burning generally refers to the direct feeding and combustion of municipal solid waste in a furnace without any significant waste preprocessing. The only materials typically removed from the waste stream prior to combustion are large bulky objects and potentially hazardous or undesirable wastes. The technology has evolved over the last 100 or so years from simple incineration to the most highly developed and commercially proven process available for both reducing the volume of MSW and for recovering energy in the forms of steam and electricity. In general, mass burn plants are considered to operate reliably with high availability.

  8. Understanding requirements of novel healthcare information systems for management of advanced prostate cancer.

    Science.gov (United States)

    Wagholikar, Amol S; Fung, Maggie; Nelson, Colleen C

    2012-01-01

    Effective management of chronic diseases is a global health priority. A healthcare information system offers opportunities to address challenges of chronic disease management. However, the requirements of health information systems are often not well understood. The accuracy of requirements has a direct impact on the successful design and implementation of a health information system. Our research describes methods used to understand the requirements of health information systems for advanced prostate cancer management. The research conducted a survey to identify heterogeneous sources of clinical records. Our research showed that the General Practitioner was the common source of patient's clinical records (41%) followed by the Urologist (14%) and other clinicians (14%). Our research describes a method to identify diverse data sources and proposes a novel patient journey browser prototype that integrates disparate data sources.

  9. Tank waste remediation system privatization infrastructure program requirements and document management process guide

    International Nuclear Information System (INIS)

    ROOT, R.W.

    1999-01-01

    This guide provides the Tank Waste Remediation System Privatization Infrastructure Program management with processes and requirements to appropriately control information and documents in accordance with the Tank Waste Remediation System Configuration Management Plan (Vann 1998b). This includes documents and information created by the program, as well as non-program generated materials submitted to the project. It provides appropriate approval/control, distribution and filing systems

  10. Requirements on the Wismut rehabilitation project in terms of waste management and planning law

    International Nuclear Information System (INIS)

    Rengeling, H.W.

    2003-01-01

    The present paper deals with the question as to what extent the EC Directives, especially the more recent ones, and their transposition into national law entail altered requirements for the rehabilitation and management of radiologically relevant former mining sites. Its main focus is on waste management law. Furthermore, it briefly deals with questions concerning the IVU Directive in conjunction with German Federal Emission Control Law as well as with some issues concerning environmental impact assessments [de

  11. Comparison of Diverting Colostomy and Bowel Management Catheter Applications in Fournier Gangrene Cases Requiring Fecal Diversion.

    Science.gov (United States)

    Eray, Ismail Cem; Alabaz, Omer; Akcam, Atilgan Tolga; Ulku, Abdullah; Parsak, Cem Kaan; Sakman, Gurhan; Seydaoglu, Gulsah

    2015-12-01

    In some patients of Fournier gangrene originated from perianal region, it is important to prevent fecal contamination in order to provide healing without wound infection. For this purposes, diverting colostomy or bowel management catheter methods were performed. In this study, it is aimed to carry out a comparison of prognosis and cost efficiency between diverting colostomy and bowel management catheter methods applied for preventing fecal contamination in Fournier's gangrene patients. Fourty-eight patients with diagnosis of Fournier's gangrene, serious perianal infections, and preserved sphincters and without rectum injury after debridement were included in the study. The cases were divided into two groups as patients who were subjected to colostomy for fecal diversion and who were subjected to bowel management catheter without colostomy. Then, the groups were compared in terms of age, predisposing factors, duration of hospital stay, mortality, additional surgery requirements, and cost. Fourty-eight patients were included the study. Sixteen patients were treated without colostomy. Decreased duration of total hospital stay, additional surgery requirements, and hospital expense in bowel management catheter group has determined. It is thought that preferring bowel management catheter method instead of colostomy in patients without rectum injury, who require diverting colostomy and have undamaged anal sphincters, can relieve patients, patients' relatives, healthcare organizations, and the national economy of a serious burden. In addition, although patients' satisfaction and workforce loss factors are not taken into consideration in this study, the bowel management catheter method is thought to have positive effects also on these parameters.

  12. Water management requirements for animal and plant maintenance on the Space Station

    Science.gov (United States)

    Johnson, C. C.; Rasmussen, D.; Curran, G.

    1987-01-01

    Long-duration Space Station experiments that use animals and plants as test specimens will require increased automation and advanced technologies for water management in order to free scientist-astronauts from routine but time-consuming housekeeping tasks. The three areas that have been identified as requiring water management and that are discusseed are: (1) drinking water and humidity condensate of the animals, (2) nutrient solution and transpired water of the plants, and (3) habitat cleaning methods. Automation potential, technology assessment, crew time savings, and resupply penalties are also discussed.

  13. Complex-wide review of DOE's Low-Level Waste Management ES ampersand H vulnerabilities. Volume II. Final report

    International Nuclear Information System (INIS)

    1996-05-01

    Volume I of this report presents a summary of DOE's complex-wide review of its low-level waste management system, including the assessment scope and methodology, site-specific and complex-wide vulnerabilities, and DOE's conclusions and recommendations. Volume II presents a more detailed discussion of the assessment methodology and evaluation instruments developed by the Assessment Working Group for identifying site-specific vulnerabilities, categorizing and classifying vulnerabilities, and identifying and analyzing complex-wide vulnerabilities. Attachments A and B of this volume contain, respectively, the Site Evaluation Survey and the Vulnerability Assessment Form used in those processes. Volume III contains the site-specific assessment reports for the 36 sites (38 facilities) assessed in the complex-wide review from which the complex-wide vulnerabilities were drawn

  14. Prostate-specific antigen as an estimator of prostate volume in the management of patients with symptomatic benign prostatic hyperplasia

    NARCIS (Netherlands)

    Mochtar, CA; Kiemeney, LALM; van Riemsdijk, MM; Barnett, GS; Laguna, MP; Debruyne, FMJ; de la Rosette, JJMCH

    2003-01-01

    Objectives: To assess the ability of serum prostate specific antigen (PSA) to estimate prostate volume (PV) to aid in the management of patients with benign prostatic hyperplasia (BPH). Methods: From 1989 to 2002, data were collected from 2264 patients complaining of lower urinary tract symptoms

  15. Detailed requirements document for common software of shuttle program information management system

    Science.gov (United States)

    Everette, J. M.; Bradfield, L. D.; Horton, C. L.

    1975-01-01

    Common software was investigated as a method for minimizing development and maintenance cost of the shuttle program information management system (SPIMS) applications while reducing the time-frame of their development. Those requirements satisfying these criteria are presented along with the stand-alone modules which may be used directly by applications. The SPIMS applications operating on the CYBER 74 computer, are specialized information management systems which use System 2000 as a data base manager. Common software provides the features to support user interactions on a CRT terminal using form input and command response capabilities. These features are available as subroutines to the applications.

  16. Regulatory requirements important to Hanford single-shell tank waste management decisions

    International Nuclear Information System (INIS)

    Keller, J.F.; Woodruff, M.G.

    1989-06-01

    This report provides an initial analysis of the regulations that may be pertinent to SST management activities (e.g., characterization, disposal, retrieval, processing, etc.) and the interrelationships among those regulations. Waste disposal decisions regarding SST waste must consider the regulatory requirements against which technical solutions will be evaluated. Regulatory requirements can also be used as guidelines for management and disposal of waste in a manner that protects human health and safety and the environment. Also, in cases where waste management regulations do not specifically address a waste form, such as radioactive mixed waste, the SST waste may come under the purview of a number of regulations related to radioactive waste management, hazardous waste management, and water and air quality protection. This report provides a comprehensive review of the environmental pollution control and radioactive waste management statutes and regulations that are relevant to SST waste characterization and management. Also, other statutes and regulations that contain technical standards that may be used in the absence of directly applicable regulations are analyzed. 8 refs., 4 figs

  17. Policy Requirements and Factors of High-Level Radioactive Waste Management

    International Nuclear Information System (INIS)

    Lee, Kang Myoung; Jeong, J. Y.; Ha, K. M.

    2007-06-01

    Recently, the need of high-level radioactive waste policy including spent fuel management becomes serious due to the rapid increase in oil price, the nationalism of natural resources, and the environmental issues such as Tokyo protocol. Also, the policy should be established urgently to prepare the saturation of on-site storage capacity of spent fuel, the revision of 'Agreement for Cooperation-Concerning Civil Uses of Atomic Energy' between Korea and US, the anxiety for nuclear weapon proliferation, and R and D to reduce the amount of waste to be disposed. In this study, we performed case study of US, Japan, Canada and Finland, which have special laws and plans/roadmaps for high-level waste management, to draw the policy requirements to be considered in HLW management. Also, we reviewed social conflict issues experienced in our society, and summarized the factors affecting the political and social environment. These policy requirements and factors summarized in this study should be considered seriously in the process for public consensus and the policy making regarding HLW management. Finally, the following 4 action items were drawn to manage HLW successfully : - Continuous and systematic R and D activities to obtain reliable management technology - Promoting companies having specialty in HLW management - Nurturing experts and workforce - Drive the public consensus process

  18. PROFESSIONAL ACCOUNTANTS’ PERSPECTIVE OF SKILLS REQUIRED TO PROGRESS TO MANAGEMENT POSITIONS

    OpenAIRE

    Fouché, J. P.; Kgapola, M. P.

    2016-01-01

    In South Africa, not only is the shortage in skills a general predicament, but so also is the shortage of professional accountants. The markets and business environments are changing almost every day and so do the skills sets required by professional accountants. The purpose of the study is to assist professional accountants in defining the skills required for management positions and to enable them to plan their careers better. A cross-sectional survey was used. The majority of participants ...

  19. Conceptual requirements for large fusion experiment control, data, robotics, and management systems

    International Nuclear Information System (INIS)

    Gaudreau, M.P.J.; Sullivan, J.D.

    1987-05-01

    The conceptual system requirements for the control, data, robotics, and project management (CDRM) system for the next generation of fusion experiments are developed by drawing on the success of the Tara control and data system. The requirements are described in terms of an integrated but separable matrix of well-defined interfaces among the various systems and subsystems. The study stresses modularity, performance, cost effectiveness, and exportability

  20. Waste Receiving and Processing Facility Module 1 Data Management System software requirements specification

    International Nuclear Information System (INIS)

    Rosnick, C.K.

    1996-01-01

    This document provides the software requirements for Waste Receiving and Processing (WRAP) Module 1 Data Management System (DMS). The DMS is one of the plant computer systems for the new WRAP 1 facility (Project W-0126). The DMS will collect, store and report data required to certify the low level waste (LLW) and transuranic (TRU) waste items processed at WRAP 1 as acceptable for shipment, storage, or disposal

  1. Waste Receiving and Processing Facility Module 1 Data Management System Software Requirements Specification

    International Nuclear Information System (INIS)

    Brann, E.C. II.

    1994-01-01

    This document provides the software requirements for Waste Receiving and Processing (WRAP) Module 1 Data Management System (DMS). The DMS is one of the plant computer systems for the new WRAP 1 facility (Project W-026). The DMS will collect, store and report data required to certify the low level waste (LLW) and transuranic (TRU) waste items processed at WRAP 1 as acceptable for shipment, storage, or disposal

  2. State of the Art : Integrated Management of Requirements in Model-Based Software Engineering

    OpenAIRE

    Thörn, Christer

    2006-01-01

    This report describes the background and future of research concerning integrated management of requirements in model-based software engineering. The focus is on describing the relevant topics and existing theoretical backgrounds that form the basis for the research. The report describes the fundamental difficulties of requirements engineering for software projects, and proposes that the results and methods of models in software engineering can help leverage those problems. Taking inspiration...

  3. Managing Supplier Requirements with HSE Accounting The case of the Mechanical Engineering Company Bisma Jaya, Indonesia

    Directory of Open Access Journals (Sweden)

    Stefan Schaltegger

    2011-12-01

    the HSE performance of an Indonesian company as a response to customer audit requirements.  The company is a supplier of a large oil company and seeks for effective and efficient ways of HSE improvement. The paper unfolds benefits and limitations of narrow efficiency-oriented responses to rating systems and audits and highlights that efficiency considerations in HSE management are only partially useful and require complementing effectiveness considerations on HSE performance.

  4. Waste Receiving and Processing Facility Module 1 Data Management System Software Requirements Specification

    Energy Technology Data Exchange (ETDEWEB)

    Brann, E.C. II

    1994-09-09

    This document provides the software requirements for Waste Receiving and Processing (WRAP) Module 1 Data Management System (DMS). The DMS is one of the plant computer systems for the new WRAP 1 facility (Project W-026). The DMS will collect, store and report data required to certify the low level waste (LLW) and transuranic (TRU) waste items processed at WRAP 1 as acceptable for shipment, storage, or disposal.

  5. Concept for a Satellite-Based Advanced Air Traffic Management System : Volume 8. Operational Logic Flow Diagrams for a Generic Advanced Air Traffic Management system

    Science.gov (United States)

    1974-02-01

    The volume presents a description of the services a generic Advanced Air Traffic Management System (AATMS) should provide to the useres of the system to facilitate the safe, efficient flow of traffic. It provides a definition of the functions which t...

  6. Generalized Information Architecture for Managing Requirements in IBM?s Rational DOORS(r) Application.

    Energy Technology Data Exchange (ETDEWEB)

    Aragon, Kathryn M.; Eaton, Shelley M.; McCornack, Marjorie Turner; Shannon, Sharon A.

    2014-12-01

    When a requirements engineering effort fails to meet expectations, often times the requirements management tool is blamed. Working with numerous project teams at Sandia National Laboratories over the last fifteen years has shown us that the tool is rarely the culprit; usually it is the lack of a viable information architecture with well- designed processes to support requirements engineering. This document illustrates design concepts with rationale, as well as a proven information architecture to structure and manage information in support of requirements engineering activities for any size or type of project. This generalized information architecture is specific to IBM's Rational DOORS (Dynamic Object Oriented Requirements System) software application, which is the requirements management tool in Sandia's CEE (Common Engineering Environment). This generalized information architecture can be used as presented or as a foundation for designing a tailored information architecture for project-specific needs. It may also be tailored for another software tool. Version 1.0 4 November 201

  7. Bystander Exposure to Ultra-Low-Volume Insecticide Applications Used for Adult Mosquito Management

    Directory of Open Access Journals (Sweden)

    Robert K.D. Peterson

    2011-06-01

    Full Text Available A popular and effective management option for adult mosquitoes is the use of insecticides applied by ultra-low-volume (ULV equipment. However, there is a paucity of data on human dermal exposure to insecticides applied by this method. The objective of the current study was to estimate dermal exposures to the insecticide active ingredient permethrin using water- (Aqua-Reslin® and oil-based (Permanone® 30-30 formulations with passive dosimetry. No significant differences in deposition of permethrin were observed between years, distance from the spray source, front or back of the body, or the placement of the patches on the body. However, exposure to Aqua-Reslin was significantly greater than Permanone 30-30 and average concentrations deposited on the body were 4.2 and 2.1 ng/cm2, respectively. The greater deposition of Aqua-Reslin is most likely due to the higher density of the water-based formulation which causes it to settle out faster than the lighter oil-based formulation of Permanone 30-30. The estimated average absorbed dermal exposure for permethrin from Aqua-Reslin and Permanone 30-30 was 0.00009 and 0.00005 mg/kg body weight, respectively. We also found that ground deposition of ULV insecticides can be used as a surrogate for estimating dermal exposure. The estimated exposures support the findings of previous risk assessments that exposure to ULV applications used for mosquito management are below regulatory levels of concern.

  8. Radiation-Induced Organizing Pneumonia: A Characteristic Disease that Requires Symptom-Oriented Management.

    Science.gov (United States)

    Otani, Keisuke; Seo, Yuji; Ogawa, Kazuhiko

    2017-01-27

    Radiation-induced organizing pneumonia (RIOP) is an inflammatory lung disease that is occasionally observed after irradiation to the breast. It is a type of secondary organizing pneumonia that is characterized by infiltrates outside the irradiated volume that are sometimes migratory. Corticosteroids work acutely, but relapse of pneumonia is often experienced. Management of RIOP should simply be symptom-oriented, and the use of corticosteroids should be limited to severe symptoms from the perspective not only of cost-effectiveness but also of cancer treatment. Once steroid therapy is started, it takes a long time to stop it due to frequent relapses. We review RIOP from the perspective of its diagnosis, epidemiology, molecular pathogenesis, and patient management.

  9. Virtual endoscopy and 3D volume rendering in the management of frontal sinus fractures.

    Science.gov (United States)

    Belina, Stanko; Cuk, Viseslav; Klapan, Ivica

    2009-12-01

    Frontal sinus fractures (FSF) are commonly caused by traffic accidents, assaults, industrial accidents and gunshot wounds. Classical roentgenography has high proportion of false negative findings in cases of FSF and is not particularly useful in examining the severity of damage to the frontal sinus posterior table and the nasofrontal duct region. High resolution computed tomography was inavoidable during the management of such patients but it may produce large quantity of 2D images. Postprocessing of datasets acquired by high resolution computer tomography from patients with severe head trauma may offer a valuable additional help in diagnostics and surgery planning. We performed virtual endoscopy (VE) and 3D volume rendering (3DVR) on high resolution CT data acquired from a 54-year-old man with with both anterior and posterior frontal sinus wall fracture in order to demonstrate advantages and disadvantages of these methods. Data acquisition was done by Siemens Somatom Emotion scanner and postprocessing was performed with Syngo 2006G software. VE and 3DVR were performed in a man who suffered blunt trauma to his forehead and nose in an traffic accident. Left frontal sinus anterior wall fracture without dislocation and fracture of tabula interna with dislocation were found. 3D position and orientation of fracture lines were shown in by 3D rendering software. We concluded that VE and 3DVR can clearly display the anatomic structure of the paranasal sinuses and nasopharyngeal cavity, revealing damage to the sinus wall caused by a fracture and its relationship to surrounding anatomical structures.

  10. Institute of Nuclear Materials Management 36. annual meeting: Proceedings. Volume 24

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    The sessions at this meeting covered the following topics: international safeguards; physical protection; material control and accountability (MC and A) training; waste overview; nonproliferation and arms control -- US/former Soviet Union; MC and A/physical protection -- SNM storage; spent fuel storage; physical protection -- intrusion sensors and access delay; MC and A -- gamma ray and holdup measurements; MC and A -- neutron based measurements; MC and A/nonproliferation and arms control -- fissile materials disposition; low level waste; packaging and transportation; international safeguards and nonproliferation and arms control -- IAEA verification in the US; international safeguards and physical protection -- video systems; poster and demonstrations; international safeguards and physical protection -- T.I.D.'s, tags and seals; high level wastes and mixed waste; MC and A -- bulk measurements; MC and A and physical protection -- policy; nonproliferation and arms control -- detection and monitoring techniques; nonproliferation and arms control -- US-Russian lab-to-lab safeguards cooperation; MC and A -- information systems; physical protection and MC and A -- vulnerability assessments; waste management -- measurement; international safeguards -- integrated and remote monitoring systems; MC and A -- material control and accountability and indicators; nonproliferation and arms control -- treaties and analysis; nonproliferation and arms control -- plutonium/HEU nonproliferation; MC and A -- measurement control and verification; and international safeguards and nonproliferation and arms control -- environmental monitoring and export control. Separate abstracts were prepared for some of the papers in this volume

  11. A Data Management System Integrating Web-based Training and Randomized Trials: Requirements, Experiences and Recommendations.

    Science.gov (United States)

    Muroff, Jordana; Amodeo, Maryann; Larson, Mary Jo; Carey, Margaret; Loftin, Ralph D

    2011-01-01

    This article describes a data management system (DMS) developed to support a large-scale randomized study of an innovative web-course that was designed to improve substance abuse counselors' knowledge and skills in applying a substance abuse treatment method (i.e., cognitive behavioral therapy; CBT). The randomized trial compared the performance of web-course-trained participants (intervention group) and printed-manual-trained participants (comparison group) to determine the effectiveness of the web-course in teaching CBT skills. A single DMS was needed to support all aspects of the study: web-course delivery and management, as well as randomized trial management. The authors briefly reviewed several other systems that were described as built either to handle randomized trials or to deliver and evaluate web-based training. However it was clear that these systems fell short of meeting our needs for simultaneous, coordinated management of the web-course and the randomized trial. New England Research Institute's (NERI) proprietary Advanced Data Entry and Protocol Tracking (ADEPT) system was coupled with the web-programmed course and customized for our purposes. This article highlights the requirements for a DMS that operates at the intersection of web-based course management systems and randomized clinical trial systems, and the extent to which the coupled, customized ADEPT satisfied those requirements. Recommendations are included for institutions and individuals considering conducting randomized trials and web-based training programs, and seeking a DMS that can meet similar requirements.

  12. 78 FR 62638 - Agency Recordkeeping/Reporting Requirements Under Emergency Review by the Office of Management...

    Science.gov (United States)

    2013-10-22

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Administration for Children and Families Agency Recordkeeping/Reporting Requirements Under Emergency Review by the Office of Management and Budget (OMB) Title: Low Income Home Energy Assistance Program (LIHEAP) Grantee Needs Assessment. OMB No.: New Collection. Description: This information collection is a...

  13. Evaluation of Requirements for Volt/Var Control and Optimization Function in Distribution Management Systems

    DEFF Research Database (Denmark)

    Rahimi, Saaed; Marinelli, Mattia; Silvestro, Federico

    2012-01-01

    To meet the requirement from new visions within “smart grid” and to provide solutions for many challenges that DSOs (Distribution System Operators) are facing today, we need to develop advanced DMS (Distribution Management System) applications. A centralized Volt/Var Control (VVC) is one of the m...

  14. Architecturally Significant Requirements Identification, Classification and Change Management for Multi-tenant Cloud-Based Systems

    DEFF Research Database (Denmark)

    Chauhan, Muhammad Aufeef; Probst, Christian W.

    2017-01-01

    presented a framework for requirements classification and change management focusing on distributed Platform as a Service (PaaS) and Software as a Service (SaaS) systems as well as complex software ecosystems that are built using PaaS and SaaS, such as Tools as a Service (TaaS). We have demonstrated...

  15. An alternate property tax program requiring a forest management plan and scheduled harvesting

    Science.gov (United States)

    D.F. Dennis; P.E. Sendak

    1991-01-01

    Vermont's Use Value Appraisal property tax program, designed to address problems such as tax inequity and forced development caused by taxing agricultural and forest land based on speculative values, requires a forest management plan and scheduled harvests. A probit analysis of enrollment provides evidence of the program's success in attracting large parcels...

  16. 25 CFR 20.515 - What is required for case management?

    Science.gov (United States)

    2010-04-01

    ....515 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR HUMAN SERVICES FINANCIAL ASSISTANCE AND SOCIAL SERVICES PROGRAMS Child Assistance Foster Care § 20.515 What is required for case management? Social services workers must document regular contact with children and families in accordance...

  17. 75 FR 52753 - Agency Recordkeeping/Reporting Requirements Under Emergency Review by the Office of Management...

    Science.gov (United States)

    2010-08-27

    ... therefore submitting a revised data collection form for emergency clearance. The definition of subsidized... Recordkeeping/Reporting Requirements Under Emergency Review by the Office of Management and Budget (OMB) Title: TANF Emergency Fund Subsidized Employment Report, Form OFA- 200. OMB No.: New Collection. Description...

  18. 75 FR 32473 - Agency Recordkeeping/Reporting Requirements Under Emergency Review by the Office of Management...

    Science.gov (United States)

    2010-06-08

    ... a TANF Emergency Fund award. The definition of subsidized employment used for this collection is the... Recordkeeping/Reporting Requirements Under Emergency Review by the Office of Management and Budget (OMB) Title: TANF Emergency Fund Subsidized Employment Report, Form OFA 200. OMB No.: New Collection. Description...

  19. Identifying and confirming information and system quality requirements for multi-agency disaster management

    NARCIS (Netherlands)

    Bharosa, N.; Appelman, J.A.; Van Zanten, B.; Zuurmond, A.

    2009-01-01

    This paper investigates the relevance and assurance of information and system quality as requirements for information systems success during disaster management. Despite the many examples of poor information quality and poor system quality, research on the relevance and assurance of these

  20. Entrepreneurship management skills requirements in an emerging economy: A South African outlook

    Directory of Open Access Journals (Sweden)

    M. Anastacia Mamabolo

    2017-05-01

    Aim: This study’s aim was to determine skills required by South African entrepreneurs to run their businesses. Setting: Entrepreneurs who own and run businesses in South Africa. Method: A sequential exploratory mixed method research design was applied in the study. Phase I, which consisted of qualitative interviews with 15 entrepreneurs and 6 national experts, resulted in skills that were used to develop a survey instrument. A survey was conducted in Phase II on 235 entrepreneurs to confirm the skills to a larger population. Results: Confirmatory factor analysis results showed that entrepreneurs require financial management, human resource management, start-up, social and interpersonal, leadership, personality, marketing, technical and business management skills. Conclusion: The identified skills through empirical research will be instrumental in the training of entrepreneurs and as a tool to measure skills in future entrepreneurship skills research.

  1. Energy management system for power distribution. Interfaces and data communication requirements

    International Nuclear Information System (INIS)

    Koponen, P.; Lemstroem, B.; Ikonen, J.

    1995-01-01

    The opening of the electricity market for competition in Finland creates new requirements for the information systems and data communication in distribution utilities. Energy management systems for distribution utilities are needed with interfaces that make it possible to separate the network business from the energy trade business. However, these interfaces should also support optimization of the whole energy supply system of the country. In this report the interfaces and data communication requirements of the energy management system of the electricity trade business are analyzed. To support this subfunctions of the energy management have been analyzed. It was realized that the amount of necessary data transfer and optimization of the national power system both depend strongly on the general rules of the energy markets. (author)

  2. Step 1: Human System Integration Pilot-Technology Interface Requirements for Weather Management

    Science.gov (United States)

    2005-01-01

    This document involves definition of technology interface requirements for Hazardous Weather Avoidance. Technology concepts in use by the Access 5 Weather Management Work Package were considered. Beginning with the Human System Integration (HIS) high-level functional requirement for Hazardous Weather Avoidance, and Hazardous Weather Avoidance technology elements, HSI requirements for the interface to the pilot were identified. Results of the analysis describe (1) the information required by the pilot to have knowledge of hazardous weather, and (2) the control capability needed by the pilot to obtain hazardous weather information. Fundamentally, these requirements provide the candidate Hazardous Weather Avoidance technology concepts with the necessary human-related elements to make them compatible with human capabilities and limitations. The results of the analysis describe how Hazardous Weather Avoidance operations and functions should interface with the pilot to provide the necessary Weather Management functionality to the UA-pilot system. Requirements and guidelines for Hazardous Weather Avoidance are partitioned into four categories: (1) Planning En Route (2) Encountering Hazardous Weather En Route, (3) Planning to Destination, and (4) Diversion Planning Alternate Airport. Each requirement is stated and is supported with a rationale and associated reference(s).

  3. 14 CFR 119.65 - Management personnel required for operations conducted under part 121 of this chapter.

    Science.gov (United States)

    2010-01-01

    ... or Part 135 of This Chapter § 119.65 Management personnel required for operations conducted under... of management personnel due to— (1) The kind of operation involved; (2) The number and type of... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Management personnel required for...

  4. 14 CFR 119.69 - Management personnel required for operations conducted under part 135 of this chapter.

    Science.gov (United States)

    2010-01-01

    ... or Part 135 of This Chapter § 119.69 Management personnel required for operations conducted under... of management personnel due to— (1) The kind of operation involved; (2) The number and type of... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Management personnel required for...

  5. DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Gerber, E.W.

    1995-10-01

    The US Department of Energy (DOE) has developed an Integrated Program Plan (IPP) to address concerns identified in Defense Nuclear Facilities Safety Board Recommendation 94-1. The IPP describes the actions that DOE plans to implement at its various sites to convert excess fissile materials to forms or conditions suitable for safe interim storage. The baseline IPP was issued as DOE`s Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 Implementation Plan (IP), which was transmitted to the DNFSB on February 28, 1995. The IPP is being further developed to include complex-wide requirements for research and development and a long-range facility requirements section. The planned additions to the baseline IPP are being developed based on a systems engineering approach that integrates facilities and capabilities at the various DOE sites and focuses on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 and to provide a basis for formulating planned additions to the IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the baseline DNFSB Recommendation 94-1 IPP. The SISMPs will be periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations.

  6. DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 1

    International Nuclear Information System (INIS)

    Gerber, E.W.

    1995-10-01

    The US Department of Energy (DOE) has developed an Integrated Program Plan (IPP) to address concerns identified in Defense Nuclear Facilities Safety Board Recommendation 94-1. The IPP describes the actions that DOE plans to implement at its various sites to convert excess fissile materials to forms or conditions suitable for safe interim storage. The baseline IPP was issued as DOE's Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 Implementation Plan (IP), which was transmitted to the DNFSB on February 28, 1995. The IPP is being further developed to include complex-wide requirements for research and development and a long-range facility requirements section. The planned additions to the baseline IPP are being developed based on a systems engineering approach that integrates facilities and capabilities at the various DOE sites and focuses on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 and to provide a basis for formulating planned additions to the IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the baseline DNFSB Recommendation 94-1 IPP. The SISMPs will be periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations

  7. Solid Waste Management Requirements Definition for Advanced Life Support Missions: Results

    Science.gov (United States)

    Alazraki, Michael P.; Hogan, John; Levri, Julie; Fisher, John; Drysdale, Alan

    2002-01-01

    Prior to determining what Solid Waste Management (SWM) technologies should be researched and developed by the Advanced Life Support (ALS) Project for future missions, there is a need to define SWM requirements. Because future waste streams will be highly mission-dependent, missions need to be defined prior to developing SWM requirements. The SWM Working Group has used the mission architecture outlined in the System Integration, Modeling and Analysis (SIMA) Element Reference Missions Document (RMD) as a starting point in the requirement development process. The missions examined include the International Space Station (ISS), a Mars Dual Lander mission, and a Mars Base. The SWM Element has also identified common SWM functionalities needed for future missions. These functionalities include: acceptance, transport, processing, storage, monitoring and control, and disposal. Requirements in each of these six areas are currently being developed for the selected missions. This paper reviews the results of this ongoing effort and identifies mission-dependent resource recovery requirements.

  8. Training requirements and responsibilities for the Buried Waste Integrated Demonstration at the Radioactive Waste Management Complex

    International Nuclear Information System (INIS)

    Vega, H.G.; French, S.B.; Rick, D.L.

    1992-09-01

    The Buried Waste Integrated Demonstration (BWID) is scheduled to conduct intrusive (hydropunch screening tests, bore hole installation, soil sampling, etc.) and nonintrusive (geophysical surveys) studies at the Radioactive Waste Management Complex (RWMC). These studies and activities will be limited to specific locations at the RWMC. The duration of these activities will vary, but most tasks are not expected to exceed 90 days. The BWID personnel requested that the Waste Management Operational Support Group establish the training requirements and training responsibilities for BWID personnel and BWID subcontractor personnel. This document specifies these training requirements and responsibilities. While the responsibilities of BWID and the RWMC are, in general, defined in the interface agreement, the training elements are based on regulatory requirements, DOE orders, DOE-ID guidance, state law, and the nature of the work to be performed

  9. Requirements for a systems-based research and development management process in transport infrastructure engineering

    Directory of Open Access Journals (Sweden)

    Rust, Frederik Christoffel

    2015-05-01

    Full Text Available The management of research and development (R&D in the transport infrastructure field is complex due to the multidisciplinary nature of the work. The literature shows that linear R&D models that progress from idea through to consumer product are not suitable for the management of such multi-disciplinary projects. This study focuses on determining the key characteristics required for a systems-based approach to the management of R&D projects. The information and data was compiled from literature reviews, interviews, and an e-mail survey with responses from 42 significant international R&D programmes. The findings confirmed the need for a systems-based approach to R&D management. The study formulated twelve principles or tenets for a new, systems-based approach.

  10. Preliminary Assessment of Operational Hazards and Safety Requirements for Airborne Trajectory Management (ABTM) Roadmap Applications

    Science.gov (United States)

    Cotton, William B.; Hilb, Robert; Koczo, Stefan, Jr.; Wing, David J.

    2016-01-01

    A set of five developmental steps building from the NASA TASAR (Traffic Aware Strategic Aircrew Requests) concept are described, each providing incrementally more efficiency and capacity benefits to airspace system users and service providers, culminating in a Full Airborne Trajectory Management capability. For each of these steps, the incremental Operational Hazards and Safety Requirements are identified for later use in future formal safety assessments intended to lead to certification and operational approval of the equipment and the associated procedures. Two established safety assessment methodologies that are compliant with the FAA's Safety Management System were used leading to Failure Effects Classifications (FEC) for each of the steps. The most likely FEC for the first three steps, Basic TASAR, Digital TASAR, and 4D TASAR, is "No effect". For step four, Strategic Airborne Trajectory Management, the likely FEC is "Minor". For Full Airborne Trajectory Management (Step 5), the most likely FEC is "Major".

  11. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs draft environmental impact statement. Volume 1, Appendix B: Idaho National Engineering Laboratory Spent Nuclear Fuel Management Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    The US Department of Energy (DOE) has prepared this report to assist its management in making two decisions. The first decision, which is programmatic, is to determine the management program for DOE spent nuclear fuel. The second decision is on the future direction of environmental restoration, waste management, and spent nuclear fuel management activities at the Idaho National Engineering Laboratory. Volume 1 of the EIS, which supports the programmatic decision, considers the effects of spent nuclear fuel management on the quality of the human and natural environment for planning years 1995 through 2035. DOE has derived the information and analysis results in Volume 1 from several site-specific appendixes. Volume 2 of the EIS, which supports the INEL-specific decision, describes environmental impacts for various environmental restoration, waste management, and spent nuclear fuel management alternatives for planning years 1995 through 2005. This Appendix B to Volume 1 considers the impacts on the INEL environment of the implementation of various DOE-wide spent nuclear fuel management alternatives. The Naval Nuclear Propulsion Program, which is a joint Navy/DOE program, is responsible for spent naval nuclear fuel examination at the INEL. For this appendix, naval fuel that has been examined at the Naval Reactors Facility and turned over to DOE for storage is termed naval-type fuel. This appendix evaluates the management of DOE spent nuclear fuel including naval-type fuel.

  12. A Qualitative Study to Identify Skills and Competency Required for Hospital Managers

    Science.gov (United States)

    Barati, Omid; Sadeghi, Ahmad; Khammarnia, Mohammad; Siavashi, Elham; Oskrochi, Gholamreza

    2016-01-01

    Introduction Hospital managers aim to improve the efficiency and effectiveness of their institutions through leadership and guidance of medical personnel. Fulfilling these objectives requires a holistic approach to both the management of people and institutional prioritization. The aim of this study was to identify the skills and competencies that hospital managers must demonstrate in order to achieve their objectives. Methods In 2015, a regional, multi-center qualitative study was undertaken in Shiraz, Iran. Interviews and focus group discussions were conducted with university hospital managers, senior managers, faculty members, and post-graduate students, and the results were analyzed using the content analysis method by MAXQDA software. Results Eight key skill themes (communication, experience, appreciation of institution logistics/infrastructure, management skills, motivation, systematic problem solving, ethics, and financial/legal awareness) were identified among the hospital managers. The common challenges that face hospital institutions include problems with hierarchical and organizational structure, excessive rules and regulations, lack of resources, poor post-graduate education, and overall management. Recurring themes with respect to how these could be addressed included changing the culture and belief structure of the hospital, restructuring the organizational hierarchy, and empowering the people. Conclusion In our cohort, practical skills, such as communication and experience, were considered more important than theoretical skills for the effective management and administration of hospitals. Therefore, we suggest that practical, skill-based training should be emphasized for students of these disciplines so they will be better suited to deal with real world challenges. Further organizational improvements also can be attained by the active and constructive involvement of senior university managers. PMID:27504159

  13. Assessment and management of ageing of major nuclear power plant components important to safety: In-containment instrumentation and control cables. Volume I

    International Nuclear Information System (INIS)

    2000-12-01

    At present, there are over four hundred operational nuclear power plants (NPPs) in IAEA Member States. Operating experience has shown that ineffective control of the ageing degradation of major NPP components (e.g. caused by unanticipated phenomena and by operating, maintenance, design or manufacturing error) can jeopardize plant safety and also plant life. Ageing in these NPPs must be therefore effectively managed to ensure the availability of design functions throughout the plant service life. From the safety perspective, this means controlling within acceptable limits the ageing degradation and wear-out of plant components important to safety so that adequate safety margins remain, i.e. integrity and functional capability in excess of normal operating requirements. This publication is one in a series of guidance reports on the assessment and management of ageing of the major NPP components important to safety. The reports are based on experience and practices of NPP operators, regulators, designers, manufacturers, and technical support organizations and a widely accepted Methodology for the Management of Ageing of NPP Components Important to Safety, which was issued by the IAEA in 1992. The current practices for the assessment of safety margins (fitness-for-service) and the inspection, monitoring and mitigation of ageing degradation of selected components of Canadian deuterium-uranium (CANDU) reactors, boiling water reactors (BWRs), pressurized water reactors (PWRs), including the Soviet designed 'water moderated and water cooled energy reactors' (WWERs), are documented in the reports. These practices are intended to help all involved directly and indirectly in ensuring the safe operation of NPPs, and to provide a common technical basis for dialogue between plant operators and regulators when dealing with age related licensing issues. The guidance reports are directed at technical experts and managers from NPPs and from regulatory, plant design, manufacturing

  14. Assessment and management of ageing of major nuclear power plant components important to safety: In-containment instrumentation and control cables. Volume II

    International Nuclear Information System (INIS)

    2000-12-01

    At present, there are over four hundred operational nuclear power plants (NPPs) in IAEA Member States. Operating experience has shown that ineffective control of the ageing degradation of major NPP components (e.g. caused by unanticipated phenomena and by operating, maintenance, design or manufacturing error) can jeopardize plant safety and also plant life. Ageing in these NPPs must be therefore effectively managed to ensure the availability of design functions throughout the plant service life. From the safety perspective, this means controlling within acceptable limits the ageing degradation and wear-out of plant components important to safety so that adequate safety margins remain, i.e. integrity and functional capability in excess of normal operating requirements. This publication is one in a series of guidance reports on the assessment and management of ageing of the major NPP components important to safety. The reports are based on experience and practices of NPP operators, regulators, designers, manufacturers, and technical support organizations and a widely accepted Methodology for the Management of Ageing of NPP Components Important to Safety, which was issued by the IAEA in 1992. The current practices for the assessment of safety margins (fitness-for-service) and the inspection, monitoring and mitigation of ageing degradation of selected components of Canadian deuterium-uranium (CANDU) reactors, boiling water reactors (BWRs), pressurized water reactors (PWRs), including the Soviet designed 'water moderated and water cooled energy reactors' (WWERs), are documented in the reports. These practices are intended to help all involved directly and indirectly in ensuring the safe operation of NPPs, and to provide a common technical basis for dialogue between plant operators and regulators when dealing with age related licensing issues. The guidance reports are directed at technical experts and managers from NPPs and from regulatory, plant design, manufacturing

  15. Skills required for the management of Black-owned small enterprises in Soweto

    Directory of Open Access Journals (Sweden)

    Ellen Nkosi

    2013-08-01

    Research purpose: The purpose of the study was to identify the most pertinent business and management skills required for the management of small enterprises in Soweto. Motivation for the study: Small-business creation is viewed as being a major contributor to economic growth. The motivation of the study was to foster understanding with regard to which business and management skills are essential to the longevity of a small business and to foster growth in small-business creation. Research design, approach and method: A qualitative survey was conducted amongst 25 Black-owned small enterprises in Soweto. Data were gathered by means of semi-structured interviews. Content analysis, using literature as basis for common themes forthcoming from the interviews, was employed as the means of data analysis. Main findings: The findings indicated that most enterprise owners lack management and business skills, that there is no single key success factor in managing small enterprises, that competitive advantage is seemingly overlooked and that small-enterprise owners seem to be driven by non-monetary rewards. Practical/managerial implications: The study affirmed that a contextualised approach to management is crucial, irrespective of the scope of the business and that strategy is considered in a different light in a small business. Contribution/value-add: Although the findings did not suggest anything contrary to the literature relating to skills, they did highlight the uniqueness of strategic management aspects in small enterprises and also alluded to the communal outlook of Black small-enterprise owners.

  16. What is required to guarantee data quality for regional traffic management. Implementation of traffic data quality management in the Middle Netherlands

    NARCIS (Netherlands)

    Seelen, P.A.G.; Vrancken, J.L.M.

    2013-01-01

    VERDER, a partnership of different governmental organizations in the Middle Netherlands, initiated different projects for regional traffic management to better use existing road capacity and safeguard mobility in the Middle Netherlands. This active form of traffic management requires traffic data

  17. 25 CFR 900.46 - What requirements are imposed upon the Secretary for financial management by these standards?

    Science.gov (United States)

    2010-04-01

    ... financial management by these standards? 900.46 Section 900.46 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT... Management Systems Standards for Financial Management Systems § 900.46 What requirements are imposed upon the Secretary for financial management by these standards? The Secretary shall establish procedures, consistent...

  18. Using SCOR as a Supply Chain Management Framework for Government Agency Contract Requirements

    Science.gov (United States)

    Paxton, Joseph; Tucker, Brian

    2010-01-01

    This paper will present a model that uses the Supply-Chain Operations Reference (SCOR) model as a foundation for a framework to illustrate the information needed throughout a product lifecycle to support a healthy supply chain management function and the subsequent contract requirements to enable it. It will also show where in the supply chain the information must be extracted. The ongoing case study used to exemplify the model is NASA's (National Aeronautics and Space Administration) Ares I program for human spaceflight. Effective supply chain management and contract requirements are ongoing opportunities for continuous improvement within government agencies, specifically development of systems for human spaceflight operations. Multiple reports from the Government Accountability Office (GAO) reinforce this importance. The SCOR model is a framework for describing a supply chain with process building blocks and business activities. It provides a set of metrics for measuring supply chain performance and best practices for continuously improving. This paper expands the application of the SCOR to also provide the framework for defining information needed from different levels of the supply chain and at different phases of the lifecycle. These needs can be incorporated into contracts to enable more effective supply chain management. Depending on the phase of the lifecycle, effective supply chain management will require involvement from different levels of the organization and different levels of the supply chain.

  19. Management competencies required in the transition from a technician to a supervisor

    Directory of Open Access Journals (Sweden)

    Sibongile R. Mahlangu (Kubheka

    2015-05-01

    Full Text Available Orientation: Technicians are frequently promoted to supervisory positions based on their technical abilities, with scant attention focused on developing management competencies. This oversight often poses significant challenges. The effective transition from technician to supervisor is important in any organisation. Research objective: The primary objective is to identify and verify the competencies that are required for a technician and a supervisory position; the secondary objective is to identify the gap that must be filled with relevant training interventions to enable technicians to make an effective transition to a supervisory position. Motivation for this study: The identification of the management competencies required for a technician who makes a career change to a supervisor position. Research method: The sequential mixed method approach was used to enable the twophase data collection process: phase one was the quantitative phase and phase two was the qualitative phase. Main findings: The overall findings confirm that there are indeed management competencies that technicians require training and development on before being promoted to a supervisory position. Implication: Organisations need to identify the key competencies for a technician and a supervisor and implement development or training interventions that are essential to successfully transition an employee from the level of a technician to the level of a supervisor. Contribution: Organisations need to implement essential development or training interventions focused on developing management competencies and put in place support interventions such as coaching, job shadowing, mentoring and networking.

  20. Fifth international conference on radioactive waste management and environmental remediation -- ICEM '95: Proceedings. Volume 2: Management of low-level waste and remediation of contaminated sites and facilities

    International Nuclear Information System (INIS)

    Slate, S.; Baker, R.; Benda, G.

    1995-01-01

    The objective of this conference is the broad international exchange of information on technologies, operations, management approaches, economics, and public policies in the critical areas of radioactive waste management and environmental remediation. The ICEM '95 technical program includes four parallel program tracks: Low/intermediate-level waste management; High-level waste, spent fuel, nuclear material management; Environmental remediation and facility D and D; and Major institutional issues in environmental management. Volume 2 contains approximately 200 papers divided into the following topical sections: Characterization of low and intermediate level waste; Treatment of low and intermediate level waste; LLW disposal and near-surface contaminant migration; Characterization and remediation of contaminated sites; and Decontamination and decommissioning technologies and experience. Papers have been processed separately for inclusion on the data base

  1. Estimation of crop water requirements using remote sensing for operational water resources management

    Science.gov (United States)

    Vasiliades, Lampros; Spiliotopoulos, Marios; Tzabiras, John; Loukas, Athanasios; Mylopoulos, Nikitas

    2015-06-01

    An integrated modeling system, developed in the framework of "Hydromentor" research project, is applied to evaluate crop water requirements for operational water resources management at Lake Karla watershed, Greece. The framework includes coupled components for operation of hydrotechnical projects (reservoir operation and irrigation works) and estimation of agricultural water demands at several spatial scales using remote sensing. The study area was sub-divided into irrigation zones based on land use maps derived from Landsat 5 TM images for the year 2007. Satellite-based energy balance for mapping evapotranspiration with internalized calibration (METRIC) was used to derive actual evapotranspiration (ET) and crop coefficient (ETrF) values from Landsat TM imagery. Agricultural water needs were estimated using the FAO method for each zone and each control node of the system for a number of water resources management strategies. Two operational strategies of hydro-technical project development (present situation without operation of the reservoir and future situation with the operation of the reservoir) are coupled with three water demand strategies. In total, eight (8) water management strategies are evaluated and compared. The results show that, under the existing operational water resources management strategies, the crop water requirements are quite large. However, the operation of the proposed hydro-technical projects in Lake Karla watershed coupled with water demand management measures, like improvement of existing water distribution systems, change of irrigation methods, and changes of crop cultivation could alleviate the problem and lead to sustainable and ecological use of water resources in the study area.

  2. 1999 Annual Mixed Waste Management Facility Groundwater Correction - Action Report (Volumes I, II, and III)

    International Nuclear Information System (INIS)

    Chase, J.

    2000-01-01

    This Corrective Action Report (CAR) for the Mixed Waste Management Facility (MWMF) is being prepared to comply with the Resource Conservation and Recovery Act (RCRA) Permit Number SC1 890 008 989, dated October 31, 1999. This CAR compiles and presents all groundwater sampling and monitoring activities that are conducted at the MWMF. As set forth in previous agreements with South Carolina Department of Health and Environmental Control (SCDHEC), all groundwater associated with the Burial Ground Complex (BGC) (comprised of the MWMF, Low-Level Radioactive Waste Disposal Facility, and Old Radioactive Waste Burial Ground) will be addressed under this RCRA Permit. This CAR is the first to be written for the MWMF and presents monitoring activities and results as an outcome of Interim Status and limited Permitted Status activities. All 1999 groundwater monitoring activities were conducted while the MWMF was operated during Interim Status. Changes to the groundwater monitoring program were made upon receipt of the RCRA Permit, where feasible. During 1999, 152 single-screened and six multi-screened groundwater monitoring wells at the BGC monitored groundwater quality in the uppermost aquifer as required by the South Carolina Hazardous Waste Management Regulations (SCHWMR), settlement agreements 87-52-SW and 91-51-SW, and RCRA Permit SC1 890 008 989. However, overall compliance with the recently issued RCRA Permit could not be implemented until the year 2000 due to the effective date of the RCRA Permit and scheduling of groundwater monitoring activities. Changes have been made to the groundwater monitoring network to meet Permit requirements for all 2000 sampling events

  3. Management competencies in higher education: Perceived job importance in relation to level of training required

    Directory of Open Access Journals (Sweden)

    Ingrid L. Potgieter

    2010-11-01

    Research purpose: The aim of this article is to determine the relationship between a specific set of HOD managerial competencies identified as being important for the job and the level of training required in terms of these competencies. Motivation for the study: Research has provided evidence that HODs are often ill-prepared for their managerial role, which requires the development of specific management competencies to enable them to fulfil their roles effectively. Research design, approach and method: A non-experimental quantitative survey design approach was followed and correlational data analyses were performed. A cross-sectional sample of 41 HODs of 22 departments from various faculties of a higher education institution in Gauteng participated in this study. The Management Competency Inventory (MCI of Visser (2009 was applied as a measure. Main findings: The Pearson product-moment analysis indicated that there is a significant relationship between the competencies indicated as being important for the job and the level of training required. Practical/Managerial implications: Training needs of HODs should be formally assessed and the depth of training required in terms of the identified management competencies should be considered in the design of training programmes. Contributions/Value-add: The information obtained in this study may potentially serve as a foundation for the development of an HOD training programme in the South African higher education environment.

  4. Commercial radioactive waste management system feasibility with the universal canister concept. Volume 1

    International Nuclear Information System (INIS)

    Morissette, R.P.; Schneringer, P.E.; Lane, R.K.; Moore, R.L.; Young, K.A.

    1986-01-01

    A Program Research and Development Announcement (PRDA) was initiated by DOE to solicit from industry new and novel ideas for improvements in the nuclear waste management system. GA Technologies Inc. was contracted to study a system utilizing a universal canister which could be loaded at the reactor and used throughout the waste management system. The proposed canister was developed with the objective of meeting the mission requirements with maximum flexibility and at minimum cost. Canister criteria were selected from a thorough analysis of the spent fuel inventory, and canister concepts were evaluated along with the shipping and storage casks to determine the maximum payload. Engineering analyses were performed on various cask/canister combinations. One important criterion was the interchangeability of the canisters between truck and rail cask systems. A canister was selected which could hold three PWR intact fuel elements or up to eight consolidated PWR fuel elements. One canister could be shipped in an overweight truck cask or six in a rail cask. Economic analysis showed a cost savings of the reference system under consideration at that time

  5. Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    2011-01-01

    Pursuant to the Mercury Export Ban Act of 2008 (P.L. 110-414), DOE was directed to designate a facility or facilities for the long-term management and storage of elemental mercury generated within the United States. Therefore, DOE has analyzed the storage of up to 10,000 metric tons (11,000 tons) of elemental mercury in a facility(ies) constructed and operated in accordance with the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (74 FR 31723). DOE prepared this Final Mercury Storage EIS in accordance with the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.), the Council on Environmental Quality (CEQ) implementing regulations (40 CFR 1500–1508), and DOE’s NEPA implementing procedures (10 CFR 1021) to evaluate reasonable alternatives for a facility(ies) for the long-term management and storage of elemental mercury. This Final Mercury Storage EIS analyzes the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven candidate locations: Grand Junction Disposal Site near Grand Junction, Colorado; Hanford Site near Richland, Washington; Hawthorne Army Depot near Hawthorne, Nevada; Idaho National Laboratory near Idaho Falls, Idaho; Kansas City Plant in Kansas City, Missouri; Savannah River Site near Aiken, South Carolina; and Waste Control Specialists, LLC, site near Andrews, Texas. As required by CEQ NEPA regulations, the No Action Alternative was also analyzed as a basis for comparison. DOE intends to decide (1) where to locate the elemental mercury storage facility(ies) and (2) whether to use existing buildings, new buildings, or a combination of existing and new buildings. DOE’s Preferred Alternative for the long-term management and storage of mercury is the Waste Control Specialists, LLC, site near Andrews, Texas.

  6. Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement Volume1

    Energy Technology Data Exchange (ETDEWEB)

    2011-01-01

    Pursuant to the Mercury Export Ban Act of 2008 (P.L. 110-414), DOE was directed to designate a facility or facilities for the long-term management and storage of elemental mercury generated within the United States. Therefore, DOE has analyzed the storage of up to 10,000 metric tons (11,000 tons) of elemental mercury in a facility(ies) constructed and operated in accordance with the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (74 FR 31723).DOE prepared this Final Mercury Storage EIS in accordance with the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.), the Council on Environmental Quality (CEQ) implementing regulations (40 CFR 1500–1508), and DOE’s NEPA implementing procedures (10 CFR 1021) to evaluate reasonable alternatives for a facility(ies) for the long-term management and storage of elemental mercury. This Final Mercury Storage EIS analyzes the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven candidate locations:Grand Junction Disposal Site near Grand Junction, Colorado; Hanford Site near Richland, Washington; Hawthorne Army Depot near Hawthorne, Nevada; Idaho National Laboratory near Idaho Falls, Idaho;Kansas City Plant in Kansas City, Missouri; Savannah River Site near Aiken, South Carolina; and Waste Control Specialists, LLC, site near Andrews, Texas. As required by CEQ NEPA regulations, the No Action Alternative was also analyzed as a basis for comparison. DOE intends to decide (1) where to locate the elemental mercury storage facility(ies) and (2) whether to use existing buildings, new buildings, or a combination of existing and new buildings. DOE’s Preferred Alternative for the long-term management and storage of mercury is the Waste Control Specialists, LLC, site near Andrews, Texas.

  7. The Importance of Information Technology as a Strategic Resource for Hospital Management Process and the Management Skills Required for Managers

    Directory of Open Access Journals (Sweden)

    Jayr Figueiredo de Oliveira

    2016-05-01

    Full Text Available The developed research debates which is the perception of the administrators and hospital area managers about the ideal professional competency profile that the leadership occupants must have had in front of the available IT resources. The general objective, therefore, consisted in uplevel the inquired ones perception regarding the ideal professional competency to fulfill management tasks within hospital environment. The research with descriptive nature consisted of a Survey that has involved 900 professionals from 36 hospital institutions both public and private from the health sector, and composed by two steps (discussion and questionnaire. The results pointed out that the Professional competency profile considered ideal would have been the attributes related to the knowledge and ability to strategic and operational  planning, leadership ability and ethics attitude.

  8. Implementation of requirements of environmental management (ISO 14000) for the decommissioning of the heavy water plant

    International Nuclear Information System (INIS)

    Gonzalez, Maria I.; Otero de Eppenstein, Marta; Tosi, Lidia E.; Sabio, Manuel

    2000-01-01

    The National Atomic Energy Commission (CNEA) of Argentina has a project of decommissioning in the heavy water plant (Planta Experimental de Agua Pesada - PEAP). The aim of this project is to get some experience for decommissioning of nuclear plants and to achieve knowledge about the application of the requirements in environmental management. The project is being carried out according to ISO 14001 standards 'Environmental Management Systems'. The objectives were taken from the model without any expectation of achieving the complete implementation or certification of the system. This report is a description of the acts that have been done. (author)

  9. An assessment of partition and transmutation against UK requirements for radioactive waste management: supporting studies

    International Nuclear Information System (INIS)

    Cummings, R.; Crookshanks, C.E.; McAdams, R.; Rogers, J.M.; Sims, H.E.; Smith-Briggs, J.L.

    1996-06-01

    A study of partition and transmutation (P and T) has recently been reported: An Assessment of Partition and Transmutation Against UK Requirements for Radioactive Waste Management (DOE/RAS/96.007). The prospects were assessed for real safety or financial gains being made through the future use of partition and transmutation within the United Kingdom in radioactive waste management. The assessment was made by AEA Technology, on behalf of the Department of the Environment. The assessment was partly based on the results of a number of studies described here. (Author)

  10. Draft Waste Management Programmatic Environmental Impact Statement for managing treatment, storage, and disposal of radioactive and hazardous waste. Volume 3, Appendix A: Public response to revised NOI, Appendix B: Environmental restoration, Appendix C, Environmental impact analysis methods, Appendix D, Risk

    International Nuclear Information System (INIS)

    1995-08-01

    Volume three contains appendices for the following: Public comments do DOE's proposed revisions to the scope of the waste management programmatic environmental impact statement; Environmental restoration sensitivity analysis; Environmental impacts analysis methods; and Waste management facility human health risk estimates

  11. MORE. Management of Requirements in NPP modernisation projects - Project report 2005

    International Nuclear Information System (INIS)

    Thunem, A.P.J.; Fredriksen, R.; Thunem, H.P.J.; Ventae, O.; Valkonen, J.; Holmberg, J.E.

    2006-04-01

    The overall objective of the project MORE is to improve the means for managing the large amounts of evolving requirements in Nordic NPP modernisation projects. In accordance to this objective, the activity will facilitate the industrial utilisation of the research results from the project TACO. On the basis of experiences in the Nordic countries, the overall aim of the TACO project has been to identify the best practices and most important criteria for ensuring effective communication in relation to requirements elicitation and analysis, understandability of requirements to all parties, and traceability of requirements. The project resulted in the development of a traceability model for handling requirements from their origins and through their final shapes. Particular emphasis for the MORE project in 2005 was put on utilising a prototype of a tool (TRACE) intended to support an adopted approach to dependable requirements engineering, suitable for modelling and handling large amounts of requirements related to all stages of the systems development process and not only those traditionally including requirements at high-level stages. (au)

  12. Quality assurance requirements and description for the Civilian Radioactive Waste Management Program

    International Nuclear Information System (INIS)

    1992-01-01

    The Quality Assurance Requirements and Description (QARD) is the principal quality assurance document for the Civilian Radioactive Waste Management Program (Program). It establishes the minimum requirements for the Quality Assurance Program. The QARD contains regulatory requirements and program commitments necessary for the development of an effective quality assurance program. Quality assurance implementing documents must be based on, and consistent with, QARD requirements. The QARD applies to the following: (1) acceptance of spent nuclear fuel and high-level radioactive waste; (2) transport of spent nuclear fuel and high-level radioactive waste; (3) the Monitored Retrievable Storage (MRS) facility through application for an operating license; (4) Mined Geologic Disposal System (MGDS), including the site characterization activities (exploratory studies facility (ESF) and surface based testing), through application for an operating license; (5) the high-level-waste form from production through acceptance. Section 2.0 defines in greater detail criteria for determining work subject to QARD requirements. The QARD is organized into sections, supplements, appendices, and a glossary. The sections contain requirements that are common to all Program elements. The supplements contain requirements for specialized activities. The appendices contain requirements that are specific to an individual Program element. The glossary establishes a common vocabulary for the Quality Assurance Program

  13. MORE. Management of Requirements in NPP modernisation projects - Project report 2005

    Energy Technology Data Exchange (ETDEWEB)

    Thunem, A.P.J.; Fredriksen, R.; Thunem, H.P.J. [IFE (Norway); Ventae, O.; Valkonen, J.; Holmberg, J.E. [VTT Technical Research Centre of Finland (Finland)

    2006-04-15

    The overall objective of the project MORE is to improve the means for managing the large amounts of evolving requirements in Nordic NPP modernisation projects. In accordance to this objective, the activity will facilitate the industrial utilisation of the research results from the project TACO. On the basis of experiences in the Nordic countries, the overall aim of the TACO project has been to identify the best practices and most important criteria for ensuring effective communication in relation to requirements elicitation and analysis, understandability of requirements to all parties, and traceability of requirements. The project resulted in the development of a traceability model for handling requirements from their origins and through their final shapes. Particular emphasis for the MORE project in 2005 was put on utilising a prototype of a tool (TRACE) intended to support an adopted approach to dependable requirements engineering, suitable for modelling and handling large amounts of requirements related to all stages of the systems development process and not only those traditionally including requirements at high-level stages. (au)

  14. Network, system, and status software enhancements for the autonomously managed electrical power system breadboard. Volume 3: Commands specification

    Science.gov (United States)

    Mckee, James W.

    1990-01-01

    This volume (3 of 4) contains the specification for the command language for the AMPS system. The volume contains a requirements specification for the operating system and commands and a design specification for the operating system and command. The operating system and commands sits on top of the protocol. The commands are an extension of the present set of AMPS commands in that the commands are more compact, allow multiple sub-commands to be bundled into one command, and have provisions for identifying the sender and the intended receiver. The commands make no change to the actual software that implement the commands.

  15. Information Management system of the safety regulatory requirements and guidance for the Korea next generation reactors

    Energy Technology Data Exchange (ETDEWEB)

    Yun, Y. C. [LG-EDS Systems, Seoul (Korea, Republic of); Lee, J. H.; Lee, H. C.; Lee, J. S. [Korea Institute of Nuclear Safety, Taejon (Korea, Republic of)

    2000-05-01

    In order to achieve the safety of the Korea Next Generation Reactors (KNGR), the Korea Institute of Nuclear Safety has carried out the Safety and Regulatory Requirements and Guidance (SRRG) development program from 1992 such as establishment of the SRRG hierarchy, development of technical requirements and guidance, and consideration of new licensing system. The SRRG hierarchy for the KNGR was consisted of five tiers; Safety Objectives, Safety Principles, General Safety Criteria, Specific Safety Requirements and Safety Regulatory Guides. The developed SRRG have been compared the criteria in 10CFR and Reg. Guide in the U.S.A and the IAEA documents for assuring internationally acceptable level of the SRRG. To improve the efficiency and accuracy of SRRG development, the construction of database system was required in the course of development. Therefore, the Information Management System of SRRG for the KNGR has been developed which enables developers to quickly and accurately seek and systematically manage whole contexts of the SRRG, reference requirements, and current atomic energy regulation rules. Moreover, through homepage whose URL is 'http://kngr.kins.re.kr', the concerned persons and public can acquire the information related with SRRG and KNGR project, and post his/her thought to the opinion forum in the homepage.

  16. Information Management system of the safety regulatory requirements and guidance for the Korea next generation reactors

    International Nuclear Information System (INIS)

    Yun, Y. C.; Lee, J. H.; Lee, H. C.; Lee, J. S.

    2000-01-01

    In order to achieve the safety of the Korea Next Generation Reactors (KNGR), the Korea Institute of Nuclear Safety has carried out the Safety and Regulatory Requirements and Guidance (SRRG) development program from 1992 such as establishment of the SRRG hierarchy, development of technical requirements and guidance, and consideration of new licensing system. The SRRG hierarchy for the KNGR was consisted of five tiers; Safety Objectives, Safety Principles, General Safety Criteria, Specific Safety Requirements and Safety Regulatory Guides. The developed SRRG have been compared the criteria in 10CFR and Reg. Guide in the U.S.A and the IAEA documents for assuring internationally acceptable level of the SRRG. To improve the efficiency and accuracy of SRRG development, the construction of database system was required in the course of development. Therefore, the Information Management System of SRRG for the KNGR has been developed which enables developers to quickly and accurately seek and systematically manage whole contexts of the SRRG, reference requirements, and current atomic energy regulation rules. Moreover, through homepage whose URL is 'http://kngr.kins.re.kr', the concerned persons and public can acquire the information related with SRRG and KNGR project, and post his/her thought to the opinion forum in the homepage

  17. Model-Based Requirements Management in Gear Systems Design Based On Graph-Based Design Languages

    Directory of Open Access Journals (Sweden)

    Kevin Holder

    2017-10-01

    Full Text Available For several decades, a wide-spread consensus concerning the enormous importance of an in-depth clarification of the specifications of a product has been observed. A weak clarification of specifications is repeatedly listed as a main cause for the failure of product development projects. Requirements, which can be defined as the purpose, goals, constraints, and criteria associated with a product development project, play a central role in the clarification of specifications. The collection of activities which ensure that requirements are identified, documented, maintained, communicated, and traced throughout the life cycle of a system, product, or service can be referred to as “requirements engineering”. These activities can be supported by a collection and combination of strategies, methods, and tools which are appropriate for the clarification of specifications. Numerous publications describe the strategy and the components of requirements management. Furthermore, recent research investigates its industrial application. Simultaneously, promising developments of graph-based design languages for a holistic digital representation of the product life cycle are presented. Current developments realize graph-based languages by the diagrams of the Unified Modelling Language (UML, and allow the automatic generation and evaluation of multiple product variants. The research presented in this paper seeks to present a method in order to combine the advantages of a conscious requirements management process and graph-based design languages. Consequently, the main objective of this paper is the investigation of a model-based integration of requirements in a product development process by means of graph-based design languages. The research method is based on an in-depth analysis of an exemplary industrial product development, a gear system for so-called “Electrical Multiple Units” (EMU. Important requirements were abstracted from a gear system

  18. Compatibility of DOE energy data bases with EEMIS data requirements. [Energy Emergency Management Information Systems

    Energy Technology Data Exchange (ETDEWEB)

    D& #x27; Acierno, J; Hermelee, A

    1979-12-01

    Object of this report is to present the data from EIA data bases which are compatible with the requirements of the data structure for the Energy Emergency Management Information System (EEMIS). An overview of data availability is briefly described and presented in the EEMIS petroleum and natural gas flow diagrams as well as in a more detailed review with each data element in the EEMIS data requirements. This information is presented with the intent that it be used as an overall system guide during the data transfer task as well as in future operation of EEMIS and in the interpretation of EEMIS data.

  19. A unique aspect of ballast water management requirements – The same location concept

    International Nuclear Information System (INIS)

    Gollasch, Stephan; David, Matej

    2012-01-01

    Under certain circumstances vessels do not need to meet ballast water management requirements as stated in the International Convention for the Management and Control of Ballast Water and Sediments (BWM Convention). Besides exceptions to ensure e.g., (a) the safety of a ship, (b) discharge of ballast water for the purpose of avoiding or minimizing pollution incidents, (c) uptake and discharge on high seas of the same ballast water, the same location concept comes into play as ballast water discharges from a ship at the same location where it was taken up is also excepted from BWM requirements. The term same location was not defined in this instrument, hence it is exposed to different interpretations (e.g., a terminal, a port, a larger area where two or more ports may be located). As the BWM Convention is an instrument with biological meaning, the authors recommend a biologically meaningful definition of the same location in this contribution.

  20. Network, system, and status software enhancements for the autonomously managed electrical power system breadboard. Volume 4: Graphical status display

    Science.gov (United States)

    Mckee, James W.

    1990-01-01

    This volume (4 of 4) contains the description, structured flow charts, prints of the graphical displays, and source code to generate the displays for the AMPS graphical status system. The function of these displays is to present to the manager of the AMPS system a graphical status display with the hot boxes that allow the manager to get more detailed status on selected portions of the AMPS system. The development of the graphical displays is divided into two processes; the creation of the screen images and storage of them in files on the computer, and the running of the status program which uses the screen images.

  1. Waste management from reprocessing: a stringent regulatory requirements for high quality conditioned residues

    International Nuclear Information System (INIS)

    Bordier, J. C.; Greneche, D.; Devezeaux, J. G.; Dalcorso, J.

    2000-01-01

    Nuclear waste production and management in France is governed by safety requirements imposed to all operators. French nuclear safety relies on two basic principles: · Responsibility of the nuclear operator, which expands to waste generated, · Safety basic objectives issued by national Safety Authority. For a long time the regulatory framework for waste production and management has been satisfactorily applied and has benefited to each actor of the process. LLW/MLW and HLW nuclear waste are currently conditioned in safe matrices or packages either likely to be disposed in surface repositories or designed with the intention to be disposed underground according to their radioactive content. France is looking into the case of VLLW and has already carried out a design for future disposal, the design being in the pipe. Other types of waste (i. e. radium bearing waste, graphite, and tritium content waste) are also considered in the whole framework of French waste management. (author)

  2. Comparative study on implementation of management requires from ABNT NBR ISO/IEC 17025

    International Nuclear Information System (INIS)

    Suplino Filho, Carlos Alberto Lucas; Souza, Luciane de Rezende; Oliveira, Estela Maria de

    2014-01-01

    This work was developed in order to emphasize the importance of laboratory management system in the direction and control of the company or institute with regard to the quality of delivery of ionizing radiation service to society. It was developed a comparative study of managerial points of Deming with the managerial requirements of ISO / IEC 17025, which found that the difficulties of the laboratories indicated by nonconformities tracked during audits, are related to specific points cited by Deming. (author)

  3. Aging plant life management - the requirements defined to date by the KTA nuclear engineering codes

    International Nuclear Information System (INIS)

    Kalinowski, I.

    1996-01-01

    German nuclear engineering codes so far do not enclose a specific aging plant life management programme. However, the existing codes and standards do contain a number of applicable requirements and principles of relevance to objectives and principles of such programmes, as they also cover aging-induced effects on power plants. The major principles relating to preventive safety engineering and quality assurance are laid down in the publications KTA 1401, 1404, 1201, 1202, and KTA 3211. (DG) [de

  4. Program Manager: Journal of the Defense Systems Management College. Volume 20, Number 5, September-October 1991

    Science.gov (United States)

    1991-10-01

    Workforce 2000, The Office of Per- One ot the primary projections of graphics of their customers. ( Geber , sonnel Management commissioned a Civil Service...The Nex 30 Y, 1 1. ’Managing Differences," by Copeland-Griggs, is one of many Geber , B. (1990), "Managing Diver- tocusing on increasing productivity

  5. Program Manager: Journal of the Defense Systems Management College. Volume 23, Number 1, January-February 1994

    Science.gov (United States)

    1994-02-01

    Jones, Jr. PROGRAM MANAGER Managing Editor Esther M. Farria Art Director Greg Caruth Typography and Design Paula Croisetlere Program Manager (ISSN 0199...Company bombers to implement the strategic organization - President Clayton 1. Brukner commu- bombing doctrine. This would take all brand -new cre

  6. Key Technologies in the Context of Future Networks: Operational and Management Requirements

    Directory of Open Access Journals (Sweden)

    Lorena Isabel Barona López

    2016-12-01

    Full Text Available The concept of Future Networks is based on the premise that current infrastructures require enhanced control, service customization, self-organization and self-management capabilities to meet the new needs in a connected society, especially of mobile users. In order to provide a high-performance mobile system, three main fields must be improved: radio, network, and operation and management. In particular, operation and management capabilities are intended to enable business agility and operational sustainability, where the addition of new services does not imply an excessive increase in capital or operational expenditures. In this context, a set of key-enabled technologies have emerged in order to aid in this field. Concepts such as Software Defined Network (SDN, Network Function Virtualization (NFV and Self-Organized Networks (SON are pushing traditional systems towards the next 5G network generation.This paper presents an overview of the current status of these promising technologies and ongoing works to fulfill the operational and management requirements of mobile infrastructures. This work also details the use cases and the challenges, taking into account not only SDN, NFV, cloud computing and SON but also other paradigms.

  7. Requirement analysis for the one-stop logistics management of fresh agricultural products

    Science.gov (United States)

    Li, Jun; Gao, Hongmei; Liu, Yuchuan

    2017-08-01

    Issues and concerns for food safety, agro-processing, and the environmental and ecological impact of food production have been attracted many research interests. Traceability and logistics management of fresh agricultural products is faced with the technological challenges including food product label and identification, activity/process characterization, information systems for the supply chain, i.e., from farm to table. Application of one-stop logistics service focuses on the whole supply chain process integration for fresh agricultural products is studied. A collaborative research project for the supply and logistics of fresh agricultural products in Tianjin was performed. Requirement analysis for the one-stop logistics management information system is studied. The model-driven business transformation, an approach uses formal models to explicitly define the structure and behavior of a business, is applied for the review and analysis process. Specific requirements for the logistic management solutions are proposed. Development of this research is crucial for the solution of one-stop logistics management information system integration platform for fresh agricultural products.

  8. Quality Requirements for Electronic Health Record Systems*. A Japanese-German Information Management Perspective.

    Science.gov (United States)

    Winter, Alfred; Takabayashi, Katsuhiko; Jahn, Franziska; Kimura, Eizen; Engelbrecht, Rolf; Haux, Reinhold; Honda, Masayuki; Hübner, Ursula H; Inoue, Sozo; Kohl, Christian D; Matsumoto, Takehiro; Matsumura, Yasushi; Miyo, Kengo; Nakashima, Naoki; Prokosch, Hans-Ulrich; Staemmler, Martin

    2017-08-07

    For more than 30 years, there has been close cooperation between Japanese and German scientists with regard to information systems in health care. Collaboration has been formalized by an agreement between the respective scientific associations. Following this agreement, two joint workshops took place to explore the similarities and differences of electronic health record systems (EHRS) against the background of the two national healthcare systems that share many commonalities. To establish a framework and requirements for the quality of EHRS that may also serve as a basis for comparing different EHRS. Donabedian's three dimensions of quality of medical care were adapted to the outcome, process, and structural quality of EHRS and their management. These quality dimensions were proposed before the first workshop of EHRS experts and enriched during the discussions. The Quality Requirements Framework of EHRS (QRF-EHRS) was defined and complemented by requirements for high quality EHRS. The framework integrates three quality dimensions (outcome, process, and structural quality), three layers of information systems (processes and data, applications, and physical tools) and three dimensions of information management (strategic, tactical, and operational information management). Describing and comparing the quality of EHRS is in fact a multidimensional problem as given by the QRF-EHRS framework. This framework will be utilized to compare Japanese and German EHRS, notably those that were presented at the second workshop.

  9. Managing Requirement Volatility in an Ontology-Driven Clinical LIMS Using Category Theory

    Directory of Open Access Journals (Sweden)

    Arash Shaban-Nejad

    2009-01-01

    Full Text Available Requirement volatility is an issue in software engineering in general, and in Web-based clinical applications in particular, which often originates from an incomplete knowledge of the domain of interest. With advances in the health science, many features and functionalities need to be added to, or removed from, existing software applications in the biomedical domain. At the same time, the increasing complexity of biomedical systems makes them more difficult to understand, and consequently it is more difficult to define their requirements, which contributes considerably to their volatility. In this paper, we present a novel agent-based approach for analyzing and managing volatile and dynamic requirements in an ontology-driven laboratory information management system (LIMS designed for Web-based case reporting in medical mycology. The proposed framework is empowered with ontologies and formalized using category theory to provide a deep and common understanding of the functional and nonfunctional requirement hierarchies and their interrelations, and to trace the effects of a change on the conceptual framework.

  10. Monitoring of performance management using Quality Assurance Indicators and ISO requirement

    Directory of Open Access Journals (Sweden)

    Dargahi H

    2007-06-01

    Full Text Available Background: Quality assurance is a prevention-oriented system that can be used to improve the quality of care, increase productivity and monitor the performance management in clinical laboratories. ISO 9001: 2000 requirements are a collection of management and technical systems designed to implement quality assurance and monitor performance management in organizations. Methods: A checklist was prepared to monitor the preanalytical, analytical and postanalytical stages of laboratory performance management in 16 areas and all laboratory activities in 14 of the clinical laboratories of the Tehran University of Medical Sciences (TUMS hospitals. Collected data were stored and statistically analyzed using SPSS software. Results: The best performance, in which 77.73% of quality assurance indicators were observed, was found in Sina Hospital. However, only 57.56% of these indicators were fulfilled at Farabi Hospital, with the lowest-level performance among the clinical laboratories of TUMS hospitals. The highest level of compliance with quality assurance indicators was in the hematology departments and for facility demands in management areas. Overall, quality assurance indicators were appropriately followed in only 7% of the clinical laboratories. Conclusion: The average quality assurance observation rate in the clinical laboratories studied was 67.22%, which is insufficient and must be remedied with stricter enforcement of the ISO 9001: 2000 regulations.

  11. Requirement Analysis for the Collaborative Supply and Logistics Management of Fresh Agricultural Products

    Directory of Open Access Journals (Sweden)

    Li Jun

    2017-01-01

    Full Text Available Issues and concerns for food safety, agro-processing, and the environmental and ecological impact of food production have been attracted many research interests. Traceability and logistics management of fresh agricultural products is faced with the technological challenges including food product label and identification, activity/process characterization, information systems for the supply chain, i.e., from farm to table. Application of information technologies for food processing and logistics industry in the fields of smart packaging and materials, automation and control technology, standards and their application scenarios, and production management principles were wildly studied. A collaborative research project for the supply and logistics of fresh agricultural products in Tianjin was performed. System analysis for the logistics management information system is studied. The model-driven business transformation, an approach uses formal models to explicitly define the structure and behavior of a business, is applied for the review and analysis process. Requirements for the logistic management solutions are proposed. Development of this research is crucial for the solution integration of supply and logistic management information system for fresh agricultural products.

  12. Spent fuel storage requirements for nuclear utilities and OCRWM [Office of Civilian Radioactive Waste Management

    International Nuclear Information System (INIS)

    Wood, T.W.

    1990-03-01

    Projected spent fuel generation at US power reactors exceeds estimated aggregate pool storage capacity by approximately 30,000 metric tons of uranium (MTU). Based on the current repository schedule, little of the spent fuel inventory will be disposed of prior to shutdown of existing reactors, and a large additional capacity for surface storage of spent fuel will be required, either at reactors or at a centralized DOE storage site. Allocation of this storage requirement across the utility-DOE interface, and the resulting implications for reactor sites and the performance of the federal waste management system, were studied during the DOE MRS System Study and again subsequent to the reassessment of the repository schedule. Spent fuel logistics and cost results from these analyses will be used in definition of spent fuel storage capacity requirements for the federal system. 9 refs., 8 figs., 1 tab

  13. Requirement analysis for an electronic laboratory notebook for sustainable data management in biomedical research.

    Science.gov (United States)

    Menzel, Julia; Weil, Philipp; Bittihn, Philip; Hornung, Daniel; Mathieu, Nadine; Demiroglu, Sara Y

    2013-01-01

    Sustainable data management in biomedical research requires documentation of metadata for all experiments and results. Scientists usually document research data and metadata in laboratory paper notebooks. An electronic laboratory notebook (ELN) can keep metadata linked to research data resulting in a better understanding of the research results, meaning a scientific benefit [1]. Besides other challenges [2], the biggest hurdles for introducing an ELN seem to be usability, file formats, and data entry mechanisms [3] and that many ELNs are assigned to specific research fields such as biology, chemistry, or physics [4]. We aimed to identify requirements for the introduction of ELN software in a biomedical collaborative research center [5] consisting of different scientific fields and to find software fulfilling most of these requirements.

  14. Applying Required Navigation Performance Concept for Traffic Management of Small Unmanned Aircraft Systems

    Science.gov (United States)

    Jung, Jaewoo; D'Souza, Sarah N.; Johnson, Marcus A.; Ishihara, Abraham K.; Modi, Hemil C.; Nikaido, Ben; Hasseeb, Hashmatullah

    2016-01-01

    In anticipation of a rapid increase in the number of civil Unmanned Aircraft System(UAS) operations, NASA is researching prototype technologies for a UAS Traffic Management (UTM) system that will investigate airspace integration requirements for enabling safe, efficient low-altitude operations. One aspect a UTM system must consider is the correlation between UAS operations (such as vehicles, operation areas and durations), UAS performance requirements, and the risk to people and property in the operational area. This paper investigates the potential application of the International Civil Aviation Organizations (ICAO) Required Navigation Performance (RNP) concept to relate operational risk with trajectory conformance requirements. The approach is to first define a method to quantify operational risk and then define the RNP level requirement as a function of the operational risk. Greater operational risk corresponds to more accurate RNP level, or smaller tolerable Total System Error (TSE). Data from 19 small UAS flights are used to develop and validate a formula that defines this relationship. An approach to assessing UAS-RNP conformance capability using vehicle modeling and wind field simulation is developed to investigate how this formula may be applied in a future UTM system. The results indicate the modeled vehicles flight path is robust to the simulated wind variation, and it can meet RNP level requirements calculated by the formula. The results also indicate how vehicle-modeling fidelity may be improved to adequately verify assessed RNP level.

  15. Management of patients with implantable cardioverter-defibrillators and pacemakers who require radiation therapy.

    Science.gov (United States)

    Brambatti, Michela; Mathew, Rebecca; Strang, Barbara; Dean, Joan; Goyal, Anuja; Hayward, Joseph E; Long, Laurene; DeMeis, Patty; Smoke, Marcia; Connolly, Stuart J; Morillo, Carlos A; Amit, Guy; Capucci, Alessandro; Healey, Jeff S

    2015-10-01

    Radiation therapy (RT) may pose acute and long-term risks for patients with cardiac implantable electronic devices (CIEDs), including pacemakers (PMs) and implantable cardioverter-defibrillators (ICDs). However, the frequency of these problems has not been accurately defined. The purpose of this study was to determine the prevalence of CIEDs among patients requiring RT and report the common CIED-related problems when patients are managed according to a standard clinical care path. In a single tertiary-care center, we prospectively screened all patients requiring RT and identified patients with ICDs or PMs. We collected clinical data about their cancer, RT treatment plan, and CIED. Radiation dose to the device was estimated in all patients, and any device malfunction during RT was documented. Of the 34,706 consecutive patients receiving RT, 261 patients (0.8%, mean age 77.9 ± 9.4 years) had an implantable cardiac device: 54 (20.7%) ICDs and 207 (79.3%) PMs. The site of RT was head and neck (27.4%), chest (30.0%), and abdomen/pelvis (32.6%). Using our care path, 63.2% of patients required continuous cardiac monitoring, 14.6% required device reprogramming, 18.8% required magnet application during RT, and 3.4% required device repositioning to the contralateral side before RT. Four patients (1.5%) had inappropriate device function during RT: 3 experienced hemodynamically tolerated ventricular pacing at the maximum sensor rate, and 1 experienced a device power-on-reset. No patient died or suffered permanent device failure. Nearly 1% of patients receiving RT in this series has a PM or ICD. However, with a systematic policy of risk assessment and patient management, significant device-related complications are rare. Copyright © 2015 Heart Rhythm Society. Published by Elsevier Inc. All rights reserved.

  16. Voluntary Medical Male Circumcision: Logistics, Commodities, and Waste Management Requirements for Scale-Up of Services

    Science.gov (United States)

    Edgil, Dianna; Stankard, Petra; Forsythe, Steven; Rech, Dino; Chrouser, Kristin; Adamu, Tigistu; Sakallah, Sameer; Thomas, Anne Goldzier; Albertini, Jennifer; Stanton, David; Dickson, Kim Eva; Njeuhmeli, Emmanuel

    2011-01-01

    Background The global HIV prevention community is implementing voluntary medical male circumcision (VMMC) programs across eastern and southern Africa, with a goal of reaching 80% coverage in adult males by 2015. Successful implementation will depend on the accessibility of commodities essential for VMMC programming and the appropriate allocation of resources to support the VMMC supply chain. For this, the United States President’s Emergency Plan for AIDS Relief, in collaboration with the World Health Organization and the Joint United Nations Programme on HIV/AIDS, has developed a standard list of commodities for VMMC programs. Methods and Findings This list of commodities was used to inform program planning for a 1-y program to circumcise 152,000 adult men in Swaziland. During this process, additional key commodities were identified, expanding the standard list to include commodities for waste management, HIV counseling and testing, and the treatment of sexually transmitted infections. The approximate costs for the procurement of commodities, management of a supply chain, and waste disposal, were determined for the VMMC program in Swaziland using current market prices of goods and services. Previous costing studies of VMMC programs did not capture supply chain costs, nor the full range of commodities needed for VMMC program implementation or waste management. Our calculations indicate that depending upon the volume of services provided, supply chain and waste management, including commodities and associated labor, contribute between US$58.92 and US$73.57 to the cost of performing one adult male circumcision in Swaziland. Conclusions Experience with the VMMC program in Swaziland indicates that supply chain and waste management add approximately US$60 per circumcision, nearly doubling the total per procedure cost estimated previously; these additional costs are used to inform the estimate of per procedure costs modeled by Njeuhmeli et al. in “Voluntary Medical

  17. Voluntary medical male circumcision: logistics, commodities, and waste management requirements for scale-up of services.

    Directory of Open Access Journals (Sweden)

    Dianna Edgil

    2011-11-01

    Full Text Available BACKGROUND: The global HIV prevention community is implementing voluntary medical male circumcision (VMMC programs across eastern and southern Africa, with a goal of reaching 80% coverage in adult males by 2015. Successful implementation will depend on the accessibility of commodities essential for VMMC programming and the appropriate allocation of resources to support the VMMC supply chain. For this, the United States President's Emergency Plan for AIDS Relief, in collaboration with the World Health Organization and the Joint United Nations Programme on HIV/AIDS, has developed a standard list of commodities for VMMC programs. METHODS AND FINDINGS: This list of commodities was used to inform program planning for a 1-y program to circumcise 152,000 adult men in Swaziland. During this process, additional key commodities were identified, expanding the standard list to include commodities for waste management, HIV counseling and testing, and the treatment of sexually transmitted infections. The approximate costs for the procurement of commodities, management of a supply chain, and waste disposal, were determined for the VMMC program in Swaziland using current market prices of goods and services. Previous costing studies of VMMC programs did not capture supply chain costs, nor the full range of commodities needed for VMMC program implementation or waste management. Our calculations indicate that depending upon the volume of services provided, supply chain and waste management, including commodities and associated labor, contribute between US$58.92 and US$73.57 to the cost of performing one adult male circumcision in Swaziland. CONCLUSIONS: Experience with the VMMC program in Swaziland indicates that supply chain and waste management add approximately US$60 per circumcision, nearly doubling the total per procedure cost estimated previously; these additional costs are used to inform the estimate of per procedure costs modeled by Njeuhmeli et al. in

  18. Voluntary medical male circumcision: logistics, commodities, and waste management requirements for scale-up of services.

    Science.gov (United States)

    Edgil, Dianna; Stankard, Petra; Forsythe, Steven; Rech, Dino; Chrouser, Kristin; Adamu, Tigistu; Sakallah, Sameer; Thomas, Anne Goldzier; Albertini, Jennifer; Stanton, David; Dickson, Kim Eva; Njeuhmeli, Emmanuel

    2011-11-01

    The global HIV prevention community is implementing voluntary medical male circumcision (VMMC) programs across eastern and southern Africa, with a goal of reaching 80% coverage in adult males by 2015. Successful implementation will depend on the accessibility of commodities essential for VMMC programming and the appropriate allocation of resources to support the VMMC supply chain. For this, the United States President's Emergency Plan for AIDS Relief, in collaboration with the World Health Organization and the Joint United Nations Programme on HIV/AIDS, has developed a standard list of commodities for VMMC programs. This list of commodities was used to inform program planning for a 1-y program to circumcise 152,000 adult men in Swaziland. During this process, additional key commodities were identified, expanding the standard list to include commodities for waste management, HIV counseling and testing, and the treatment of sexually transmitted infections. The approximate costs for the procurement of commodities, management of a supply chain, and waste disposal, were determined for the VMMC program in Swaziland using current market prices of goods and services. Previous costing studies of VMMC programs did not capture supply chain costs, nor the full range of commodities needed for VMMC program implementation or waste management. Our calculations indicate that depending upon the volume of services provided, supply chain and waste management, including commodities and associated labor, contribute between US$58.92 and US$73.57 to the cost of performing one adult male circumcision in Swaziland. Experience with the VMMC program in Swaziland indicates that supply chain and waste management add approximately US$60 per circumcision, nearly doubling the total per procedure cost estimated previously; these additional costs are used to inform the estimate of per procedure costs modeled by Njeuhmeli et al. in "Voluntary Medical Male Circumcision: Modeling the Impact and Cost of

  19. 40 CFR Table 11 to Subpart G of... - Wastewater-Inspection and Monitoring Requirements for Waste Management Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Wastewater-Inspection and Monitoring Requirements for Waste Management Units 11 Table 11 to Subpart G of Part 63 Protection of Environment... and Monitoring Requirements for Waste Management Units To comply with Inspection or monitoring...

  20. 40 CFR Table 7 to Subpart Ggg of... - Wastewater-Inspection and Monitoring Requirements for Waste Management Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Wastewater-Inspection and Monitoring Requirements for Waste Management Units 7 Table 7 to Subpart GGG of Part 63 Protection of Environment... for Waste Management Units To comply with Inspection or monitoring requirement Frequency of inspection...

  1. 76 FR 76609 - Implementation of Office of Management and Budget Guidance on Drug-Free Workplace Requirements

    Science.gov (United States)

    2011-12-08

    ... Implementation of Office of Management and Budget Guidance on Drug-Free Workplace Requirements AGENCY: Office of... Management and Budget (OMB) guidance implementing the portion of the Drug-Free Workplace Act of 1988 (41 U.S... removing its regulation implementing the Governmentwide common rule on drug-free workplace requirements for...

  2. Information management and technology strategy in healthcare: local timescales and national requirements

    Directory of Open Access Journals (Sweden)

    Les Smith

    2000-01-01

    Full Text Available The UK National Health Service’s strategic switch-back is well documented and each centrally originated change results in various attempts to record the repercussions and predict the outcomes. The most recent shift is embodied in the Department of Health’s information strategy, Information for health published in September 1998. This document provides the context for an examination of the issue of developing an Information Management and Technology (IM&T strategy at the local level within the changing national requirements for NHS information management. The particular pressures on an individual unit and the need to react to them alongside the requirements of the national strategy are the subjects of this article. The case detailed is that of Clatterbridge Centre for Oncology (CCO on Merseyside, the second largest centre of its type in the UK. Its initial investigation of information needs preceded the publication of the national strategy and its implementation straddled the timescale devised by the NHS Information Authority. The inevitable incompatibility between timescales for the local and the national developments is examined within the case. The work of the new NHS Information Authority and its supporting guidance in its Circular, Information for Health: Initial Local Implementation Strategies, is evaluated as a tool in aligning local and national strategy. Information Managers in other centrally governed organisations within the public sector and large corporations are often alert to similar issues.

  3. The role of requirements management in the design of built environments: a case study

    Directory of Open Access Journals (Sweden)

    Camila Pegoraro

    2011-12-01

    Full Text Available Due to the known difficulties on managing the design process of built environments, researchers and entrepreneurs have continuously developed and implemented best practices from areas such as Project Management (PM. However, there are still gaps to be filled, such as difficulties on monitoring the stakeholder’s requirements and their dynamics. In attempt to eliminate this gap, this paper aims to analyze if requirements management (RM can be integrated to PM and which are the main advantages and disadvantages of this integration. The research includes a literature review which presents PM and RM concepts, the last one based on software engineering approach. Moreover, a case study was performed in a construction company, using semi-structured interviews. The research showed that the use of RM is advantageous, even not solving all the projects difficulties, and that the proper structuring of the projects is a condition for the success of RM implementation. The main contribution is a generic and systematic proposal for integrating the stages of the RM to the projects.

  4. Auditing of suppliers as the requirement of quality management systems in construction

    Science.gov (United States)

    Harasymiuk, Jolanta; Barski, Janusz

    2017-07-01

    The choice of a supplier of construction materials can be important factor of increase or reduction of building works costs. Construction materials present from 40 for 70% of investment task depending on kind of works being provided for realization. There is necessity of estimate of suppliers from the point of view of effectiveness of construction undertaking and necessity from the point of view of conformity of taken operation by executives of construction job and objects within the confines of systems of managements quality being initiated in their organizations. The estimate of suppliers of construction materials and subexecutives of special works is formal requirement in quality management systems, which meets the requirements of the ISO 9001 standard. The aim of this paper is to show possibilities of making use of anaudit for estimate of credibility and reliability of the supplier of construction materials. The article describes kinds of audits, that were carried in quality management systems, with particular taking into consideration audits called as second-site. One characterizes the estimate criterions of qualitative ability and method of choice of the supplier of construction materials. The paper shows also propositions of exemplary questions, that would be estimated in audit process, the way of conducting of this estimate and conditionality of estimate.

  5. Requirement Management between Regulatory Framework and Dismantling Activities for Decommissioning of a Nuclear Facility

    International Nuclear Information System (INIS)

    Park, H.S.; Jin, H.G.; Hong, Y.J.; Choi, J.W.; Park, S.

    2016-01-01

    Full text: The decommissioning and environmental remediation (D&ER) projects require stepwise long-term research and development (R&D) such as a shutdown, transition, decontamination and decommissioning (D&D) activities, radioactive waste management, and site restoration. During each step of the D&ER projects, a significant amount of information and knowledge such as experimental data, databases, design drawings, technical reports, guidelines, operation manuals, and modeling and simulation reports are produced. Knowledge based on experiences by staff members participating in each step of the D&ER project are also very important. Such knowledge based on experiences may disappear with the retirement of staff members if there are no effective and systematic approaches for its acquisition and storage. Therefore, to perform the D&ER project successfully, it is necessary to preserve written theses and experiences systematically. The integrated knowledge management system (KMS) for the D&ER projects have never been developed. Therefore, the establishment of an integrated KMS is necessary for the effective performance of D&ER projects. This study introduces a decommissioning procedure requirement management system as a part of the KMS related to the D&ER projects. (author

  6. 30 CFR 204.215 - Are the information collection requirements in this subpart approved by the Office of Management...

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Are the information collection requirements in this subpart approved by the Office of Management and Budget (OMB)? 204.215 Section 204.215 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR MINERALS REVENUE MANAGEMENT ALTERNATIVES...

  7. 41 CFR 102-72.55 - What are the requirements for obtaining a delegation of real property management and operation...

    Science.gov (United States)

    2010-07-01

    ... requirements for obtaining a delegation of real property management and operation authority from GSA? 102-72.55... operation authority from GSA? An Executive agency may be delegated real property management and operation...) Demonstrates that it can perform the delegated real property management and operation responsibilities. ...

  8. 78 FR 55230 - Safety and Environmental Management System Requirements for Vessels on the U.S. Outer Continental...

    Science.gov (United States)

    2013-09-10

    ...\\ including the regulation of workplace safety and health.\\2\\ The Coast Guard's regulatory authority extends... 147 [Docket No. USCG-2012-0779] RIN 1625-AC05 Safety and Environmental Management System Requirements... a vessel-specific Safety and Environmental Management System (SEMS) that incorporates the management...

  9. 12 CFR 225.175 - What risk management, record keeping and reporting policies are required to make merchant banking...

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 3 2010-01-01 2010-01-01 false What risk management, record keeping and... risk management, record keeping and reporting policies are required to make merchant banking... conduct, monitor and manage such investment activities and the risks associated with such investment...

  10. 3D GEO-INFORMATION REQUIREMENTS FOR DISASTER AND EMERGENCY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    E. Demir Ozbek

    2016-06-01

    Full Text Available A conceptual approach is proposed to define 3D geo-information requirement for different types of disasters. This approach includes components such as Disaster Type-Sector-Actor-Process-Activity-Task-Data. According to disaster types processes, activities, tasks, sectors, and responsible and operational actors are derived. Based on the tasks, the needed level of detail for 3D geo-information model is determined. The levels of detail are compliant with the 3D international standard CityGML. After a brief introduction on the disaster phases and geo-information requirement for actors to perform the tasks, the paper discusses the current situation of disaster and emergency management in Turkey and elaborates on components of conceptual approach. This paper discusses the 3D geo-information requirements for the tasks to be used in the framework of 3D geo-information model for Disaster and Emergency Management System in Turkey. The framework is demonstrated for an industrial fire case in Turkey.

  11. Infrastructure requirement of knowledge management system model of statistical learning tool (SLT) for education community

    Science.gov (United States)

    Abdullah, Rusli; Samah, Bahaman Abu; Bolong, Jusang; D'Silva, Jeffrey Lawrence; Shaffril, Hayrol Azril Mohamed

    2014-09-01

    Today, teaching and learning (T&L) using technology as tool is becoming more important especially in the field of statistics as a part of the subject matter in higher education system environment. Eventhough, there are many types of technology of statistical learnig tool (SLT) which can be used to support and enhance T&L environment, however, there is lack of a common standard knowledge management as a knowledge portal for guidance especially in relation to infrastructure requirement of SLT in servicing the community of user (CoU) such as educators, students and other parties who are interested in performing this technology as a tool for their T&L. Therefore, there is a need of a common standard infrastructure requirement of knowledge portal in helping CoU for managing of statistical knowledge in acquiring, storing, desseminating and applying of the statistical knowedge for their specific purposes. Futhermore, by having this infrastructure requirement of knowledge portal model of SLT as a guidance in promoting knowledge of best practise among the CoU, it can also enhance the quality and productivity of their work towards excellence of statistical knowledge application in education system environment.

  12. Regulatory requirements on management of radioactive material safe transport in China

    International Nuclear Information System (INIS)

    Chu, C.

    2016-01-01

    Since 1980s, the IAEA Regulation for safe transport of radioactive material was introduced into China; the regulatory system of China began with international standards, and walked towards the institutionalized. In 2003 the National People’s Congress (NPC) promulgated “the Act on the Prevention of Radioactive Pollution of the People's Republic of China”. In 2009 “Regulation for the Safe Transport of Radioactive Material” (Referred to “Regulation”) was promulgated by the State Council. Subsequently, the National Nuclear Safety Administration (NNSA) began to formulate executive detailed department rules, regulations guidelines and standards. The present system of acts, regulations and standards on management of safe transport of radioactive material in China and future planning were introduced in this paper. Meanwhile, the paper described the specific administration requirements of the Regulation on classification management of radioactive materials, license management of transport packaging including design, manufacture and use, licensing management of transport activities and the provisions of illegal behaviors arising in safe transport of radioactive material. (author)

  13. Managing Cuscuta gronovii (Swamp Dodder in Cranberry Requires an Integrated Approach

    Directory of Open Access Journals (Sweden)

    Hilary A. Sandler

    2010-02-01

    Full Text Available Dodders (Cuscuta spp. are parasitic plants that threaten the sustainability of many crops. Because this parasite is very adept and successful from biological and ecological perspectives, a single control strategy is unlikely to provide sufficient economic control. Dodder (C. gronovii is a particularly serious pest in commercial cranberry (Vaccinium macrocarpon production. Multiple viable strategies must be integrated and tailored into a weed management plan to provide acceptable control. The key to sustainable management of this serious pest will require a combination of chemical and cultural approaches, supported by understanding the complicated nature of dodder biology. Research from small fruit production systems like cranberry into the biology of dodder (e.g., germination patterns, host preference, use of plant growth regulators may provide insights that could ultimately be useful for other crop system management plans. This paper will present the current knowledge base for integrated management of dodder in cranberry as well as highlight relevant research from other crops and potential topics for future research.

  14. Accounting firms’ managers’ and trainees’ perceptions of managerial competencies required to manage diversity in KwaZulu-Natal, South Africa

    Directory of Open Access Journals (Sweden)

    Msizi V. Mkhize

    2017-10-01

    Full Text Available Background: In South Africa, there is a shortage of black chartered accountants, with some progress being made in transforming the industry. Accounting firms’ managers must be prepared to effectively manage the increasing diversity of the profession. Aim: The purpose of the study was to identify the managerial competencies required by accounting firms managers to effectively manage diversity in KwaZulu-Natal. Setting: The setting for this study is accounting firms in KwaZulu-Natal. Methods: A prospective, descriptive and analytical, cross-sectional design using systematic sampling was employed. The responses of 45 accounting firms’ managers and 114 trainees were analysed. Results: Both managers and trainees perceived the six managerial competencies important in managing diversity, but the ranking order of perceived importance indicated that there are variations in ratings. Teamwork and self-management competencies were highly rated by managers, while communication and teamwork competencies were highly rated by trainees. Conclusion: The managerial competencies are vital for the accounting firms’ managers. The study suggests that the accounting firms’ managers should consider the importance given by trainees and by themselves in prioritising the most important competencies they require in managing diversity. Accounting firms are encouraged to incorporate the six managerial competencies into the job descriptions or job advertisements and in the firms’ management development programme or training and development programme as the managerial competencies will assist managers in managing the diverse workforce effectively.

  15. How to scope configuration projects and manage the knowledge they require

    DEFF Research Database (Denmark)

    Shafiee, Sara; Kristjansdottir, Katrin; Hvam, Lars

    2018-01-01

    Purpose This paper aims to explore the use of the knowledge management (KM) perspective for configuration projects. Configuration projects implement configurators as information technology systems that help companies manage the specification process of customised products. An effective method...... of retrieving and formalising knowledge for configurators is essential, because it can reduce the risk of unsuccessful implementation and the time and effort required for development. Unfortunately, no standard KM frameworks are available specifically for configuration projects. This study identifies...... the knowledge necessary for different phases of a configuration project (which knowledge, for what purpose and from what sources), examines how it is transformed during a configuration project (what KM activities and tools are used) and establishes how the knowledge can be documented for future maintenance...

  16. A Study of Job Demands and Curriculum Development in Agricultural Training Related to the Muskegon County Wastewater Management System. Final Report. Volume IV. Career Awareness Information.

    Science.gov (United States)

    Fisher, Harold S.; And Others

    This is the final volume of a four-volume report of a research project designed to (1) identify job needs for agricultural occupations which will result from the Muskegon County Wastewater Management System and perform a task analysis on each occupation, (2) develop instructional modules and determine their place in either high school or 2-year…

  17. A Study of Job Demands and Curriculum Development in Agricultural Training Related to the Muskegon County Wastewater Management System. Final Report. Volume II. Task Analysis Results.

    Science.gov (United States)

    Fisher, Harold S.; And Others

    This is the second volume of a four-volume report of a research project designed to (1) identify job needs for agricultural occupations which will result from the Muskegon County Wastewater Management System and perform a task analysis on each occupation, (2) develop instructional modules and determine their place in either high school or 2-year…

  18. Toward an Agile Approach to Managing the Effect of Requirements on Software Architecture during Global Software Development

    OpenAIRE

    Alsahli, Abdulaziz; Khan, Hameed; Alyahya, Sultan

    2016-01-01

    Requirement change management (RCM) is a critical activity during software development because poor RCM results in occurrence of defects, thereby resulting in software failure. To achieve RCM, efficient impact analysis is mandatory. A common repository is a good approach to maintain changed requirements, reusing and reducing effort. Thus, a better approach is needed to tailor knowledge for better change management of requirements and architecture during global software development (GSD).The o...

  19. M-area hazardous waste management facility groundwater monitoring and corrective-action report, First quarter 1995, Volume 1

    International Nuclear Information System (INIS)

    1995-05-01

    This report, in three volumes, describes the ground water monitoring and c corrective-action program at the M-Area Hazardous Waste Management Facility (HWMF) at the Savannah River Site (SRS) during the fourth quarter 1994 and first quarter 1995. Concise description of the program and considerable data documenting the monitoring and remedial activities are included in the document. This is Volume 1 covering the following topics: sampling and results; hydrogeologic assessment; water quality assessment; effectiveness of the corrective-action program; corrective-action system operation and performance; monitoring and corrective-action program assessment; proposed monitoring and corrective-action program modifications. Also included are the following appendicies: A-standards; B-flagging criteria; C-figures; D-monitoring results tables; E-data quality/usability assessment

  20. Radioactive waste management: review on clearance levels and acceptance criteria legislation, requirements and standards.

    Science.gov (United States)

    Maringer, F J; Suráň, J; Kovář, P; Chauvenet, B; Peyres, V; García-Toraño, E; Cozzella, M L; De Felice, P; Vodenik, B; Hult, M; Rosengård, U; Merimaa, M; Szücs, L; Jeffery, C; Dean, J C J; Tymiński, Z; Arnold, D; Hinca, R; Mirescu, G

    2013-11-01

    In 2011 the joint research project Metrology for Radioactive Waste Management (MetroRWM)(1) of the European Metrology Research Programme (EMRP) started with a total duration of three years. Within this project, new metrological resources for the assessment of radioactive waste, including their calibration with new reference materials traceable to national standards will be developed. This paper gives a review on national, European and international strategies as basis for science-based metrological requirements in clearance and acceptance of radioactive waste. © 2013 Elsevier Ltd. All rights reserved.

  1. Tritium-management requirements for D-T fusion reactors (ETF, INTOR, FED)

    International Nuclear Information System (INIS)

    Finn, P.A.; Clemmer, R.G.; Misra, B.

    1981-10-01

    The successful operation of D-T fusion reactors will depend on the development of safe and reliable tritium-containment and fuel-recycle systems. The tritium handling requirements for D-T reactors were analyzed. The reactor facility was then designed from the viewpoint of tritium management. Recovery scenarios after a tritium release were generated to show the relative importance of various scenarios. A fusion-reactor tritium facility was designed which would be appropriate for all types of plants from the Engineering Test Facility (ETF), the International Tokamak Reactor (INTOR), and the Fusion Engineering Device (FED) to the full-scale power plant epitomized by the STARFIRE design

  2. Department of Energy Environmental Management cost infrastructure development program: Cost analysis requirements

    International Nuclear Information System (INIS)

    Custer, W.R. Jr.; Messick, C.D.

    1996-01-01

    This report was prepared to support development of the Department of Energy Environmental Management cost infrastructure -- a new capability to independently estimate and analyze costs. Currently, the cost data are reported according to a structure that blends level of effort tasks with product and process oriented tasks. Also. the budgetary inputs are developed from prior year funding authorizations and from contractor-developed parametric estimates that have been adjusted to planned funding levels or appropriations. Consequently, it is difficult for headquarters and field-level activities to use actual cost data and technical requirements to independently assess the costs generated and identify trends, potential cost savings from process improvements, and cost reduction strategies

  3. National Public Information Symposium on Peaceful Uses of Nuclear Energy, NUC Info' 2000. Radioactive Waste Management and Site Restoration in Uranium Industry. Proceedings. Volume 2

    International Nuclear Information System (INIS)

    Dobos, Ion; Comsa, Olivia

    2000-01-01

    These proceedings published in two volumes contain materials presented at the National Public Information Symposium on Peaceful Uses of Nuclear Energy, NUC Info' 2000. Radioactive Waste Management and Site Restoration in Uranium Industry - held on 5th September to 8th September 2000 at Baita - Bihor, Romania. The proceedings are structured in 4 sections: 1. Management of radioactive wastes arising from uranium mining, milling and decommissioning; 2. Uranium mine closing down; 3. Environmental restoration of uranium mining and milling sites; 4. Management of radioactive wastes arising from nuclear applications. The contributions in this volume debate the issues of environment restoration at uranium ore mining and management of radioactive wastes resulted from nuclear applications

  4. Program Manager: Journal of the Defense Systems Management College. Volume 18, Number 3, May-June 1989

    Science.gov (United States)

    1989-06-01

    default. Slavery to a cost-discount rate options and, therefore, his ability to project F would cost $109.99 in year 2. can well lead a decision-maker to a...at hand. of recent allegations allegations and indictments for Symbiotic interaction of "knowing" unethical and unlawful individual con- professionals...contractor crease productivity substantially in unethical and managers. defense acquisition jobs and tasks. Productive acquisition management Background

  5. Integrating total quality management principles with the requirements of DOE Order 5700.6C

    Energy Technology Data Exchange (ETDEWEB)

    Hedges, D. [Scientific Ecology Group, Inc. (United States)

    1993-03-01

    The Department of Energy has recently required its field offices, contractors, and subcontractors to implement DOE Order 5700.6C, ``Quality Assurance,`` for all work on waste management contracts. The order restructures the 18 criteria of NQA-1 and focuses on the role of management in achieving and assuring quality, performance of activities to achieve and assure quality, and management`s assessment of its performance for the purpose of identifying improvements to be made. The DOE order also introduces elements of the total quality management (TQM) philosophy, which were not present in DOE Order 5700.6B. The research community within DOE has recently issued a document entitled DOE Order 5700.6C Implementation Guide, which is more explicit about the integration of TQM principles with the implementation of DOE Order 5700.6C in research facilities. The Environmental Protection Agency is sponsoring a quality assurance standard (ANSI/ASQC E-4) to replace EPA`s QAMS 005/80. The new standard is consistent with DOE Order 5700.6C, and it also stresses the integration of TQM principles within the quality assurance process. This paper discusses the intent and philosophy of the 10 criteria of the new DOE order, the status of ANSI/ASQC E-4, and how to effectively integrate TQM principles into the quality assurance process as the conversion is made from NQA-1 to DOE Order 5700.6C. The purpose and value of DOE Order 5700.6C Implementation Guide for research will also be discussed.

  6. Oak Ridge National Laboratory Technology Logic Diagram. Volume 3, Technology evaluation data sheets: Part C, Robotics/automation, Waste management

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The Oak Ridge National Laboratory Technology Logic Diagram (TLD) was developed to provide a decision support tool that relates environmental restoration (ER) and waste management (WM) problems at Oak Ridge National Laboratory (ORNL) to potential technologies that can remediate these problems. The TLD identifies the research, development, demonstration testing, and evaluation needed to develop these technologies to a state that allows technology transfer and application to decontamination and decommissioning (D&D), remedial action (RA), and WM activities. The TLD consists of three fundamentally separate volumes: Vol. 1, Technology Evaluation; Vol. 2, Technology Logic Diagram and Vol. 3, Technology EvaLuation Data Sheets. Part A of Vols. 1 and 2 focuses on RA. Part B of Vols. 1 and 2 focuses on the D&D of contaminated facilities. Part C of Vols. 1 and 2 focuses on WM. Each part of Vol. 1 contains an overview of the TM, an explanation of the problems facing the volume-specific program, a review of identified technologies, and rankings of technologies applicable to the site. Volume 2 (Pts. A. B. and C) contains the logic linkages among EM goals, environmental problems, and the various technologies that have the potential to solve these problems. Volume 3 (Pts. A. B, and C) contains the TLD data sheets. This volume provides the technology evaluation data sheets (TEDS) for ER/WM activities (D&D, RA and WM) that are referenced by a TEDS code number in Vol. 2 of the TLD. Each of these sheets represents a single logic trace across the TLD. These sheets contain more detail than is given for the technologies in Vol. 2.

  7. Educational Project Management Instructional System. Module Two. Project Management Basic Principles. Volume I--Lessons 1 to 6. Volume II--Lessons 7 to 12. Volume III--Case Simulation.

    Science.gov (United States)

    Cummings, C. Peter; Cook, Desmond L.

    This module is the second in a self-instructional program designed to train public school personnel in how to manage educational projects. The purpose of this module is to provide current or potential project directors with the basic knowledge, skills, abilities, and sensitivities needed to manage a local educational project. In the areas of…

  8. The impact of customer-specific requirements on supply chain management

    Directory of Open Access Journals (Sweden)

    Hubert I.P. Conceivious

    2010-11-01

    Full Text Available The complexities of being a supplier to motorcar manufacturers, also known as original equipment manufacturers (OEMs, provide an array of challenges to component manufacturers. Customer-specific requirements (CSRs add to the convolutions of a supplier’s quality management systems when producing components for the various motor manufacturers. The catalytic converter industry (CCI forms part of the component supply chain in the motor industry. The CCI consists of a plethora of suppliers to produce the catalytic converter. This paper focuses on three of the five main suppliers, namely the ‘monolith substrate manufacturers’, the ‘coaters’, and the ‘canners’. Most OEMs required that critical and strategic suppliers should be ISO/TS 16949:2009 certified. ISO/TS 16949:2009 refers to an internationally recognised specification, specifically adapted for the motor industry. The specification indicates the minimum requirements and also makes provision for additional requirements known as CSRs that can be specified by the OEM.

  9. Breast cancer management: is volume related to quality? Clinical Advisory Panel.

    Science.gov (United States)

    Ma, M; Bell, J; Campbell, S; Basnett, I; Pollock, A; Taylor, I

    1997-01-01

    A method of carrying out region-wide audit for breast cancer was developed by collaboration between the cancer registry, providers and purchasers as part of work to fulfill the 'Calman-Hine' recommendations. In order to test the audit method, a retrospective audit in North Thames East compared practice in 1992 against current guidelines. The analysis compared care in specialist and non-specialist centres. A stratified random sample comprising 28% of all breast cancer patients diagnosed in 1992 was selected from the population-based Thames Cancer Registry. The data for 309 patients with stage I-III tumours were analysed by hospital type using local guidelines. No difference between specialist (high volume) and non-specialist centres was detected for factors important in survival. Pathological staging was good with over 70% reporting tumour size and grade. A small number of patients were undertreated; after conservative surgery, 10% (19) of women did not receive radiotherapy, and 15% (8) of node-positive premenopausal women did not receive chemotherapy or ovarian ablation. In contrast, a significant trend with hospital volume was found for several quality of life factors. These included access to a specialist breast surgeon and specialist breast nurses, availability of fine-needle aspiration (FNA), which ranged from 84% in high-volume to 42% in low-volume centres, and quality of surgery (axillary clearance rates ranged from 51% to 8% and sampling of less than three nodes from 3% to 25% for high- and very low-volume centres respectively). Confidential feedback of results to surgeons was welcomed and initiated change. The summary information gave purchasers information relevant to the evaluation of cancer services. While the audit applied present standards to past practice, it provided the impetus for prospective audit of current practice (now being implemented in North Thames).

  10. Radiation-resistant requirements analysis of device and control component for advanced spent fuel management process

    Energy Technology Data Exchange (ETDEWEB)

    Song, Tai Gil; Park, G. Y.; Kim, S. Y.; Lee, J. Y.; Kim, S. H.; Yoon, J. S. [Korea Atomic Energy Research Institute, Taejeon (Korea)

    2002-02-01

    It is known that high levels of radiation can cause significant damage by altering the properties of materials. A practical understanding of the effects of radiation - how radiation affects various types of materials and components - is required to design equipment to operate reliably in a gamma radiation environment. When designing equipment to operate in a high gamma radiation environment, such as will be present in a nuclear spent fuel handling facility, several important steps should be followed. In order to active test of the advanced spent fuel management process, the radiation-resistant analysis of the device and control component for active test which is concerned about the radiation environment is conducted. Also the system design process is analysis and reviewed. In the foreign literature, 'threshold' values are generally reported. the threshold values are normally the dose required to begin degradation in a particular material property. The radiation effect analysis for the device of vol-oxidation and metalization, which are main device for the advanced spent fuel management process, is performed by the SCALE 4.4 code. 5 refs., 4 figs., 13 tabs. (Author)

  11. RGMDV: An approach to requirements gathering and the management of data virtualization projects

    Science.gov (United States)

    Mousa, Ayad Hameed; Shiratuddin, Norshuhada; Bakar, Muhamad Shahbani Abu

    2015-12-01

    Data virtualization (DV) refers to a set of data stores that enable users to query, access, and manipulate data in a unified, abstracted, and encapsulated manner regardless of data location. Apart from reducing data movement, this system provides a unified, abstracted, real-time, and encapsulated view of information for query purposes. Through its provision of live, virtual data in a timely manner, the DV technique can overcome the obstacles faced by organizations and companies as a result of using other data integration techniques. The systematic planning for the period that precedes DV deployment enables organizations to avoid many challenges related to manageability, usability, data quality, and performance. DV requirements are among the most significant and challenging aspects of a DV project. In this study, an approach has been developed to gather and manage the requirements of a DV design model as an initial step in developing such projects. Expert methods are reviewed to validate and evaluate the proposed approach in terms of usability and related components; the results of this review demonstrate that the applied approaches benefit DV development projects.

  12. X-PAT: a multiplatform patient referral data management system for small healthcare institution requirements.

    Science.gov (United States)

    Masseroli, Marco; Marchente, Mario

    2008-07-01

    We present X-PAT, a platform-independent software prototype that is able to manage patient referral multimedia data in an intranet network scenario according to the specific control procedures of a healthcare institution. It is a self-developed storage framework based on a file system, implemented in eXtensible Markup Language (XML) and PHP Hypertext Preprocessor Language, and addressed to the requirements of limited-dimension healthcare entities (small hospitals, private medical centers, outpatient clinics, and laboratories). In X-PAT, healthcare data descriptions, stored in a novel Referral Base Management System (RBMS) according to Health Level 7 Clinical Document Architecture Release 2 (CDA R2) standard, can be easily applied to the specific data and organizational procedures of a particular healthcare working environment thanks also to the use of standard clinical terminology. Managed data, centralized on a server, are structured in the RBMS schema using a flexible patient record and CDA healthcare referral document structures based on XML technology. A novel search engine allows defining and performing queries on stored data, whose rapid execution is ensured by expandable RBMS indexing structures. Healthcare personnel can interface the X-PAT system, according to applied state-of-the-art privacy and security measures, through friendly and intuitive Web pages that facilitate user acceptance.

  13. National Waste Terminal Storage Program: configuration management plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    Purpose of the Configuration Management Plan is to provide the management discipline through which the integrity and continuity of program cost and schedule trade-off decisions which are made concerning the site selections and facilities performance, producibility, operability and supportability are recorded, communicated, and controlled by the Office of Waste Isolation

  14. 1987 Oak Ridge model conference: Proceedings: Volume I, Part 3, Waste Management

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    A conference sponsored by the United States Department of Energy (DOE), was held on waste management. Topics of discussion were transuranic waste management, chemical and physical treatment technologies, waste minimization, land disposal technology and characterization and analysis. Individual projects are processed separately for the data bases. (CBS)

  15. 1987 Oak Ridge model conference: Proceedings: Volume I, Part 3, Waste Management

    International Nuclear Information System (INIS)

    1987-01-01

    A conference sponsored by the United States Department of Energy (DOE), was held on waste management. Topics of discussion were transuranic waste management, chemical and physical treatment technologies, waste minimization, land disposal technology and characterization and analysis. Individual projects are processed separately for the data bases

  16. The Management of Cash. NACUBO Professional File, Volume 9, Number 6.

    Science.gov (United States)

    Boyles, William W.

    With today's relatively high interest rates, inflationary trend, and declining public support to higher education, cash management programs are of interest to the academic business officer as well as the commercial businessman. Four areas in which the management of cash can be improved are: (1) speeding collections of cash; (2) delaying…

  17. Complex-wide review of DOE's Low-Level Waste Management ES ampersand H vulnerabilities. Volume I. Final report

    International Nuclear Information System (INIS)

    1996-05-01

    The Department of Energy (DOE) conducted a comprehensive complex-wide review of its management of low-level waste (LLW) and the radioactive component of mixed low-level waste (MLLW). This review was conducted in response to a recommendation from the Defense Nuclear Facilities Safety Board (DNFSB) which was established and authorized by Congress to oversee DOE. The DNFSB's recommendation concerning conformance with safety standards at DOE LLW sites was issued on September 8, 1994 and is referred to as Recommendation 94-2. DOE's Implementation Plan for its response to Recommendation 94-2 was submitted to the DNFSB on March 31, 1995. The DNFSB recommended that a complex-wide review of DOE's LLW management be initiated. The goal of the complex-wide review of DOE's LLW management system was to identify both programmatic and physical vulnerabilities that could lead to unnecessary radiation exposure of workers or the public or unnecessary releases of radioactive materials to the environment. Additionally, the DNFSB stated that an objective of the complex-wide review should be to establish the dimensions of the DOE LLW problem and support the identification of corrective actions to address safe disposition of past, present, and future volumes of LLW. The complex-wide review involved an evaluation of LLW management activities at 38 DOE facilities at 36 sites that actively manage LLW and MLLW

  18. Sustainable smallholder intensification through improved water management requires adjusted fertilizer recommendation

    Science.gov (United States)

    Gedfew, Muluye; Schmitter, Petra; Nakawuka, Prossie; Tilahun, Seifu A.; Steenhuis, Tammo; Langan, Simon

    2017-04-01

    In Sub-Saharan Africa small scale irrigation is developing rapidly. Whilst emphasis is mainly placed on water resource availability and access for irrigation, less attention is paid to the interaction of water management on nutrient balances. The quality and quantity of irrigation water delivered to the field not only controls the nutrient flow dynamic system in the soil media but also affects production and uptake. The objective of this study is to evaluate the effect of different water management methods on partial nutrient balances in irrigated fields of the Ethiopian highlands. The study was conducted during the dry season of 2016 where farmers cultivated consecutively tomato and pepper. Farmers were grouped into three water management treatments: irrigation based on Time Domain reflect meter (TDR), on the standard crop water requirements (CWR) and the traditional farmers practice (FARM). The average water consumption for tomato in the CWR, TDR and FARM groups were 590 mm, 476 mm and 575 mm, respectively. The comparison of the water use at different stages showed that traditional farmer practice used less water at the initial stage and more water at the maturity stage which influenced the crop yield and the nutrient dynamics of NPK. For pepper, the linkage to the supplemental irrigation was slightly different due to the onset of the rainy season. The average tomato yield obtained in the farmer practice plots was 20.8 Mg ha-1 which was significantly lower than those obtained in the TDR (31.67 Mg ha-1) and the CWR (33.2 Mg ha-1) plots. The average partial nitrogen (N) depletion balance obtained for tomato in the TDR, CWR and FARM treatment were -91 kg ha-1, -151 kg ha-1 and 19 kg ha-1 respectively. For phosphorus (P) the calculated depletion balance was -0.6 kg ha-1, -0.5 kg ha-1, and - 0.2 kg ha-1, respectively whereas for potassium (K) the balances were largely negative (i.e. -284 kg ha-1, -270 kg ha-1 and -97 kg ha-1, respectively). Similar observations were

  19. Improving Operational Risk Management Using Business Performance Management Technologies

    OpenAIRE

    Bram Pieket Weeserik; Marco Spruit

    2018-01-01

    Operational Risk Management (ORM) comprises the continuous management of risks resulting from: human actions, internal processes, systems, and external events. With increasing requirements, complexity and a growing volume of risks, information systems provide benefits for integrating risk management activities and optimizing performance. Business Performance Management (BPM) technologies are believed to provide a solution for effective Operational Risk Management by offering several combined ...

  20. Oak Ridge K-25 Site Technology Logic Diagram. Volume 3, Technology evaluation data sheets; Part B, Remedial action, robotics/automation, waste management

    Energy Technology Data Exchange (ETDEWEB)

    Fellows, R.L. [ed.

    1993-02-26

    The Oak Ridge K-25 Technology Logic Diagram (TLD), a decision support tool for the K-25 Site, was developed to provide a planning document that relates environmental restoration (ER) and waste management (WN) problems at the Oak Ridge K-25 Site. The TLD technique identifies the research necessary to develop these technologies to a state that allows for technology transfer and application to waste management, remediation, decontamination, and decommissioning activities. The TLD consists of four separate volumes-Vol. 1, Vol. 2, Vol. 3A, and Vol. 3B. Volume 1 provides introductory and overview information about the TLD. Volume 2 contains logic diagrams. Volume 3 has been divided into two separate volumes to facilitate handling and use. This volume 3 B provides the Technology Evaluation Data Sheets (TEDS) for ER/WM activities (Remedial Action Robotics and Automation, Waste Management) that are referenced by a TEDS code number in Vol. 2 of the TLD. Each of these sheets represents a single logic trace across the TLD. These sheets contain more detail than each technology in Vol. 2. The TEDS are arranged alphanumerically by the TEDS code number in the upper right corner of each data sheet. Volume 3 can be used in two ways: (1) technologies that are identified from Vol. 2 can be referenced directly in Vol. 3 by using the TEDS codes, and (2) technologies and general technology areas (alternatives) can be located in the index in the front of this volume.

  1. On the Mobile Communication Requirements for the Demand-Side Management of Electric Vehicles

    Directory of Open Access Journals (Sweden)

    Stefano Rinaldi

    2018-05-01

    Full Text Available The rising concerns about global warming and environmental pollution are increasingly pushing towards the replacement of road vehicles powered by Internal Combustion Engines (ICEs. Electric Vehicles (EVs are generally considered the best candidates for this transition, however, existing power grids and EV management systems are not yet ready for a large penetration of EVs, and the current opinion of the scientific community is that further research must be done in this field. The so-called Vehicle-to-Grid (V2G concept plays a relevant role in this scenario by providing the communication capabilities required by advanced control and Demand-Side Management (DSM strategies. Following this research trend, in this paper the communication requirements for the DSM of EVs in urban environments are discussed, by focusing on the mobile communication among EVs and smart grids. A specific system architecture for the DSM of EVs moving inside urban areas is proposed and discussed in terms of the required data throughput. In addition, the use of a Low-Power Wide-Area Network (LPWAN solution—the Long-Range Wide Area Network (LoRaWAN technology—is proposed as a possible alternative to cellular-like solutions, by testing an experimental communication infrastructure in a real environment. The results show that the proposed LPWAN technology is capable to handle an adequate amount of information for the considered application, and that one LoRa base station is able to serve up to 438 EVs per cell, and 1408 EV charging points.

  2. Baseline requirements of the proposed action for the Transportation Management Division routing models

    International Nuclear Information System (INIS)

    Johnson, P.E.; Joy, D.S.

    1995-02-01

    The potential impacts associated with the transportation of hazardous materials are important to shippers, carriers, and the general public. This is particularly true for shipments of radioactive material. The shippers are primarily concerned with safety, security, efficiency, and equipment requirements. The carriers are concerned with the potential impact that radioactive shipments may have on their operations--particularly if such materials are involved in an accident. The general public has also expressed concerns regarding the safety of transporting radioactive and other hazardous materials through their communities. Because transportation routes are a central concern in hazardous material transport, the prediction of likely routes is the first step toward resolution of these issues. In response to these routing needs, several models have been developed over the past fifteen years at Oak Ridge National Laboratory (ORNL). The HIGHWAY routing model is used to predict routes for truck transportation, the INTERLINE routing model is used to predict both rail and barge routes, and the AIRPORT locator model is used to determine airports with specified criteria near a specific location. As part of the ongoing improvement of the US Department of Energy's (DOE) Environmental Management Transportation Management Division's (EM-261) computer systems and development efforts, a Baseline Requirements Assessment Session on the HIGHWAY, INTERLINE, and AIRPORT models was held at ORNL on April 27, 1994. The purpose of this meeting was to discuss the existing capabilities of the models and data bases and to review enhancements of the models and data bases to expand their usefulness. The results of the Baseline Requirements Assessment Section will be discussed in this report. The discussions pertaining to the different models are contained in separate sections

  3. Autonomous Integrated Receive System (AIRS) requirements definition. Volume 4: Functional specification for the prototype Automated Integrated Receive System (AIRS)

    Science.gov (United States)

    Chie, C. M.

    1984-01-01

    The functional requirements for the performance, design, and testing for the prototype Automated Integrated Receive System (AIRS) to be demonstrated for the TDRSS S-Band Single Access Return Link are presented.

  4. C-Band Airport Surface Communications System Standards Development. Phase II Final Report. Volume 1: Concepts of Use, Initial System Requirements, Architecture, and AeroMACS Design Considerations

    Science.gov (United States)

    Hall, Edward; Isaacs, James; Henriksen, Steve; Zelkin, Natalie

    2011-01-01

    This report is provided as part of ITT s NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: New ATM Requirements-Future Communications, C-Band and L-Band Communications Standard Development and was based on direction provided by FAA project-level agreements for New ATM Requirements-Future Communications. Task 7 included two subtasks. Subtask 7-1 addressed C-band (5091- to 5150-MHz) airport surface data communications standards development, systems engineering, test bed and prototype development, and tests and demonstrations to establish operational capability for the Aeronautical Mobile Airport Communications System (AeroMACS). Subtask 7-2 focused on systems engineering and development support of the L-band digital aeronautical communications system (L-DACS). Subtask 7-1 consisted of two phases. Phase I included development of AeroMACS concepts of use, requirements, architecture, and initial high-level safety risk assessment. Phase II builds on Phase I results and is presented in two volumes. Volume I (this document) is devoted to concepts of use, system requirements, and architecture, including AeroMACS design considerations. Volume II describes an AeroMACS prototype evaluation and presents final AeroMACS recommendations. This report also describes airport categorization and channelization methodologies. The purposes of the airport categorization task were (1) to facilitate initial AeroMACS architecture designs and enable budgetary projections by creating a set of airport categories based on common airport characteristics and design objectives, and (2) to offer high-level guidance to potential AeroMACS technology and policy development sponsors and service providers. A channelization plan methodology was developed because a common global methodology is needed to assure seamless interoperability among diverse AeroMACS services potentially supplied by multiple service providers.

  5. Eurosafe 2006 radioactive waste management: long term safety requirements and societal expectations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    The EUROSAFE Forum is part of the EUROSAFE approach, which consists of two further elements: the EUROSAFE Tribune and the EUROSAFE web site. The general aim of EUROSAFE is to contribute to fostering the convergence of technical nuclear safety practices in a broad European context. This is done by providing technical safety and research organisations, safety authorities, power utilities, the rest of the industry and non-governmental organisations mainly from the European Union and East-European countries, and international organisations with a platform for the presentation of recent analyses and R and D in the field of nuclear safety, to share experiences, exchange technical and scientific opinions, and conduct debates on key issues in the fields of nuclear safety and radiation protection. The EUROSAFE Forum 2006 focuses on 'Radioactive Waste Management: Long Term Safety Requirements and Societal Expectations' from the point of view of the authorities, TSOs and industry and presents the latest work in nuclear installation safety and research, waste management, radiation safety as well as nuclear material and nuclear facilities security carried out by GRS, IRSN, AVN and their partners in the European Union, Switzerland and Eastern Europe. A high level of nuclear safety is a priority for Europe. The technical safety organisations play an important role in contributing to that objective through appropriate approaches to major safety issues as part of their assessments and research activities. The challenges to nuclear safety are international. Changes in underlying technologies such as instrumentation and control, the impact of electricity market deregulation, demands for improved safety and safety management, the ageing of nuclear facilities, waste management, maintaining and improving scientific and technical knowledge, and the need for greater transparency - these are all issues where the value of an international approach is gaining increasing recognition. This

  6. Eurosafe 2006 radioactive waste management: long term safety requirements and societal expectations

    International Nuclear Information System (INIS)

    2006-01-01

    The EUROSAFE Forum is part of the EUROSAFE approach, which consists of two further elements: the EUROSAFE Tribune and the EUROSAFE web site. The general aim of EUROSAFE is to contribute to fostering the convergence of technical nuclear safety practices in a broad European context. This is done by providing technical safety and research organisations, safety authorities, power utilities, the rest of the industry and non-governmental organisations mainly from the European Union and East-European countries, and international organisations with a platform for the presentation of recent analyses and R and D in the field of nuclear safety, to share experiences, exchange technical and scientific opinions, and conduct debates on key issues in the fields of nuclear safety and radiation protection. The EUROSAFE Forum 2006 focuses on 'Radioactive Waste Management: Long Term Safety Requirements and Societal Expectations' from the point of view of the authorities, TSOs and industry and presents the latest work in nuclear installation safety and research, waste management, radiation safety as well as nuclear material and nuclear facilities security carried out by GRS, IRSN, AVN and their partners in the European Union, Switzerland and Eastern Europe. A high level of nuclear safety is a priority for Europe. The technical safety organisations play an important role in contributing to that objective through appropriate approaches to major safety issues as part of their assessments and research activities. The challenges to nuclear safety are international. Changes in underlying technologies such as instrumentation and control, the impact of electricity market deregulation, demands for improved safety and safety management, the ageing of nuclear facilities, waste management, maintaining and improving scientific and technical knowledge, and the need for greater transparency - these are all issues where the value of an international approach is gaining increasing recognition. This

  7. Identifying Functional Requirements for Flexible Airspace Management Concept Using Human-In-The-Loop Simulations

    Science.gov (United States)

    Lee, Paul U.; Bender, Kim; Pagan, Danielle

    2011-01-01

    Flexible Airspace Management (FAM) is a mid- term Next Generation Air Transportation System (NextGen) concept that allows dynamic changes to airspace configurations to meet the changes in the traffic demand. A series of human-in-the-loop (HITL) studies have identified procedures and decision support requirements needed to implement FAM. This paper outlines a suggested FAM procedure and associated decision support functionality based on these HITL studies. A description of both the tools used to support the HITLs and the planned NextGen technologies available in the mid-term are presented and compared. The mid-term implementation of several NextGen capabilities, specifically, upgrades to the Traffic Management Unit (TMU), the initial release of an en route automation system, the deployment of a digital data communication system, a more flexible voice communications network, and the introduction of a tool envisioned to manage and coordinate networked ground systems can support the implementation of the FAM concept. Because of the variability in the overall deployment schedule of the mid-term NextGen capabilities, the dependency of the individual NextGen capabilities are examined to determine their impact on a mid-term implementation of FAM. A cursory review of the different technologies suggests that new functionality slated for the new en route automation system is a critical enabling technology for FAM, as well as the functionality to manage and coordinate networked ground systems. Upgrades to the TMU are less critical but important nonetheless for FAM to be fully realized. Flexible voice communications network and digital data communication system could allow more flexible FAM operations but they are not as essential.

  8. Eurosafe 2006 radioactive waste management: long term safety requirements and societal expectations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    The EUROSAFE Forum is part of the EUROSAFE approach, which consists of two further elements: the EUROSAFE Tribune and the EUROSAFE web site. The general aim of EUROSAFE is to contribute to fostering the convergence of technical nuclear safety practices in a broad European context. This is done by providing technical safety and research organisations, safety authorities, power utilities, the rest of the industry and non-governmental organisations mainly from the European Union and East-European countries, and international organisations with a platform for the presentation of recent analyses and R and D in the field of nuclear safety, to share experiences, exchange technical and scientific opinions, and conduct debates on key issues in the fields of nuclear safety and radiation protection. The EUROSAFE Forum 2006 focuses on 'Radioactive Waste Management: Long Term Safety Requirements and Societal Expectations' from the point of view of the authorities, TSOs and industry and presents the latest work in nuclear installation safety and research, waste management, radiation safety as well as nuclear material and nuclear facilities security carried out by GRS, IRSN, AVN and their partners in the European Union, Switzerland and Eastern Europe. A high level of nuclear safety is a priority for Europe. The technical safety organisations play an important role in contributing to that objective through appropriate approaches to major safety issues as part of their assessments and research activities. The challenges to nuclear safety are international. Changes in underlying technologies such as instrumentation and control, the impact of electricity market deregulation, demands for improved safety and safety management, the ageing of nuclear facilities, waste management, maintaining and improving scientific and technical knowledge, and the need for greater transparency - these are all issues where the value of an international approach is gaining increasing recognition

  9. The selective conservative management of small traumatic pneumothoraces following stab injuries is safe: experience from a high-volume trauma service in South Africa.

    Science.gov (United States)

    Kong, V Y; Oosthuizen, G V; Clarke, D L

    2015-02-01

    The selective conservative management of small pneumothoraces (PTXs) following stab injuries is controversial. We reviewed a cohort of patients managed conservatively in a high volume trauma service in South Africa. A retrospective review over a 2-year period identified 125 asymptomatic patients with small PTXs measuring chest radiograph who were managed conservatively. Of the 125 patients included in the study, 92% were male (115/125), and the median age for all patients was 21 years (19-24). Ninety-seven per cent (121/125) of the weapons involved were knives, and 3% (4/125) were screwdrivers. Sixty-one per cent of all injuries were on the left side. Eighty-two per cent (102/125) sustained a single stab, and 18% (23/125) had multiple stabs. Thirty-nine per cent (49/125) had a PTX <0.5 cm (Group A), 26% (32/125) were ≥ 0.5 to <1 cm (Group B), 19% (24/125) were ≥ 1 to <1.5 cm (Group C) and 15% (20/125) were ≥ 1.5 to <2 cm (Group D). Three per cent of all patients (4/125) eventually required ICDs (one in Group C, three in Group D). All four patients had ICDs in situ for 24 h. The remaining 97% (121/125) were all managed successfully by active clinical observation alone. There were no subsequent readmissions, morbidity or mortality as a direct result of our conservative approach. The selective conservative management of asymptomatic small PTXs from stab injuries is safe if undertaken in the appropriate setting.

  10. Program Manager: Journal of the Defense Systems Management College. Volume 22, Number 3, May-June 1993

    Science.gov (United States)

    1993-06-01

    lr __________ r onM eth S()4 Greg Caruth _________________ William J. Perry, Typography and Design DEPSECDEF 43 Paula Croisetlere 3 Program Manager...the DSMC Press to be such a link to the govern- for publication consideration in either the brand ment and private sector defense acquisition com- new

  11. Management of Peptic Ulcer Bleeding in Different Case Volume Workplaces: Results of a Nationwide Inquiry in Hungary

    Directory of Open Access Journals (Sweden)

    István Rácz

    2012-01-01

    Full Text Available The aim of this study was to conduct a national survey to evaluate the recent endoscopic treatment and drug therapy of peptic ulcer bleeding (PUB patients and to compare practices in high and low case volume Hungarian workplaces. A total of 62 gastroenterology units participated in the six-month study. A total of 3033 PUB cases and a mean of 8.15±3.9 PUB cases per month per unit were reported. In the 23 high case volume units (HCV, there was a mean of 12.9±5.4 PUB cases/month, whereas in the 39 low case volume units (LCV, a mean of 5.3±2.9 PUB cases/month were treated during the study period. In HCV units, endoscopic therapies for Forrest Ia, Ib, and IIa ulcers were significantly more often used than in LCV units (86% versus 68%; P=0.001. Among patients with stigmata of recent haemorrhage (Forrest I, II, bolus + continuous infusion PPI was given significantly more frequently in HCV than in LCV units (49.6% versus 33.2%; P=0.001. Mortality in HCV units was less than in LCV units (2.7% versus 4.3%; P=0.023. The penetration of evidence-based recommendations for PUB management is stronger in HCV units resulting lower mortality.

  12. H-Area Hazardous Waste Management Facility Corrective Action Report, Third and Fourth Quarter 1998, Volumes I and II

    International Nuclear Information System (INIS)

    Chase, J.

    1999-01-01

    The groundwater in the uppermost aquifer beneath the H-Area Hazardous Waste Management Facility (HWMF), also known as the H-Area Seepage Basins, at the Savannah Site (SRS) is monitored periodically for selected hazardous and radioactive constituents. This report presents the results of the required groundwater monitoring program

  13. The Need for Dynamic Airspace Management in Coalition Operations (The International C2 Journal, Volume 5, Number 3, 2011)

    Science.gov (United States)

    2011-01-01

    Automated Deep Operations Coordination System (JADOCS), Theater Battle Management Core System ( TBMCS ), and Air Defense System Integrator (ADSI). NATO’s...be submitted to TBMCS at the AOC for inclusion in the daily ACO or change ACO. Missions requiring rapid response, such as MEDEVACs, fire missions

  14. Proceedings of the National Conference on Energy Resource Management. Volume 1: Techniques, Procedures and Data Bases

    Science.gov (United States)

    Brumfield, J. O. (Editor); Schiffman, Y. M. (Editor)

    1982-01-01

    Topics dealing with the integration of remotely sensed data with geographic information system for application in energy resources management are discussed. Associated remote sensing and image analysis techniques are also addressed.

  15. Employing asset management to control costs and sustain highway levels of service : volumes I and II.

    Science.gov (United States)

    2014-02-01

    This project investigated the impact of varying two elements of pavement, bridge, and mobility asset management on the long term networklevel : performance of those assets. The first element was the condition at which restorative treatments are tr...

  16. The DISAM Journal of International Security Assistance Management. Volume 23, Number 1, Fall 2000

    Science.gov (United States)

    2000-01-01

    Security Assistance Command Figure 1 The USASAC, including OPM-SANG, is staffed by 621 men and women , of whom 104 are military. These professionals are...by program managers. These program managers are like “front-line entreprenuers ” delivering products and services to their customers. They have been...NATO history was to be commanded by a Polish general in June 1988. The brigade of some 3000 men and women was composed of five national battalions

  17. Effects of Using Requirements Catalogs on Effectiveness and Productivity of Requirements Specification in a Software Project Management Course

    Science.gov (United States)

    Fernández-Alemán, José Luis; Carrillo-de-Gea, Juan Manuel; Meca, Joaquín Vidal; Ros, Joaquín Nicolás; Toval, Ambrosio; Idri, Ali

    2016-01-01

    This paper presents the results of two educational experiments carried out to determine whether the process of specifying requirements (catalog-based reuse as opposed to conventional specification) has an impact on effectiveness and productivity in co-located and distributed software development environments. The participants in the experiments…

  18. Toward public volume database management: a case study of NOVA, the National Online Volumetric Archive

    Science.gov (United States)

    Fletcher, Alex; Yoo, Terry S.

    2004-04-01

    Public databases today can be constructed with a wide variety of authoring and management structures. The widespread appeal of Internet search engines suggests that public information be made open and available to common search strategies, making accessible information that would otherwise be hidden by the infrastructure and software interfaces of a traditional database management system. We present the construction and organizational details for managing NOVA, the National Online Volumetric Archive. As an archival effort of the Visible Human Project for supporting medical visualization research, archiving 3D multimodal radiological teaching files, and enhancing medical education with volumetric data, our overall database structure is simplified; archives grow by accruing information, but seldom have to modify, delete, or overwrite stored records. NOVA is being constructed and populated so that it is transparent to the Internet; that is, much of its internal structure is mirrored in HTML allowing internet search engines to investigate, catalog, and link directly to the deep relational structure of the collection index. The key organizational concept for NOVA is the Image Content Group (ICG), an indexing strategy for cataloging incoming data as a set structure rather than by keyword management. These groups are managed through a series of XML files and authoring scripts. We cover the motivation for Image Content Groups, their overall construction, authorship, and management in XML, and the pilot results for creating public data repositories using this strategy.

  19. Program Manager. The Journal of the Defense Systems Management College. Volume 13, Number 4, July-August 1984,

    Science.gov (United States)

    1984-08-01

    entrepreneurship -’team made up of J. Stanley programs for people (incentives, and innovation; stern disciplinarians; Baumgartner, Calvin Brown, training, hoopla...they let them know that they were Autonomy and Entrepreneurship important to the success of the pro- Simultaneous Loose-Tight ". ,. Every PM we talked to...account hand, managing a fast-food franchise $40,000 which is now his tax base. "-" (IRA) concept. These refreshing de- is a job that can easily be

  20. Academy Sharing Knowledge (ASK). The NASA Source for Project Management Magazine, Volume 11, March 2003

    Science.gov (United States)

    2003-01-01

    APPL is a research-based organization that serves NASA program and project managers, as well as project teams, at every level of development. In 1997, APPL was created from an earlier program to underscore the importance that NASA places on project management and project teams through a wide variety of products and services, including knowledge sharing, classroom and online courses, career development guidance, performance support, university partnerships, and advanced technology tools. ASK Magazine grew out of APPL's Knowledge Sharing Initiative. The stories that appear in ASK are written by the 'best of the best' project managers, primarily from NASA, but also from other government agencies and industry. Contributors to this issue include: Teresa Bailey, a librarian at the Jet Propulsion Laboratory, Roy Malone, Deputy Director in the Safety and Mission Assurance (S&MA) Office at the NASA Marshall Space Flight Center (MSFC), W. Scott Cameron, Capital Systems Manager for the Food and Beverage Global Business Unit of Procter and Gamble, Ray Morgan, recent retiree as Vice President of AeroVironment, Inc., Marty Davis, Program Manager of the Geostationary Operational Environmental Satellite (GOES) at the NASA Goddard Space Flight Center (GSFC) in Greenbelt, Maryland, Todd Post, editor of ASK Magazine, and works for EduTech Ltd. in Silver Spring, Maryland, Dr. Owen Gadeken, professor of Engineering Management at the Defense Acquisition University, Ken Schwer, currently the Project Manager of Solar Dynamics Observatory, Dr. Edward Hoffmwan, Director of the NASA Academy of Program and Project Leadership, Frank Snow, a member of the NASA Explorer Program at Goddard Space Flight Center since 1992, Dr. Alexander Laufer, Editor-in-Chief of ASK Magazine and a member of the Advisory Board of the NASA Academy of Program and Project Leadership, Judy Stokley, presently Air Force Program Executive Officer for Weapons in Washington, D.C. and Terry Little, Director of the Kinetic