WorldWideScience

Sample records for locating gas pipe

  1. 46 CFR 154.910 - Inert gas piping: Location.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Inert gas piping: Location. 154.910 Section 154.910 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SAFETY... Atmospheric Control in Cargo Containment Systems § 154.910 Inert gas piping: Location. Inert gas piping must...

  2. ACOUSTIC DETECTING AND LOCATING GAS PIPE LINE INFRINGEMENT

    Energy Technology Data Exchange (ETDEWEB)

    John L. Loth; Gary J. Morris; George M. Palmer; Richard Guiler; Patrick Browning

    2004-10-31

    The extensive network of high-pressure natural gas transmission pipelines covering the United States provides an important infrastructure for our energy independence. Early detection of pipeline leaks and infringements by construction equipment, resulting in corrosion fractures, presents an important aspect of our national security policy. The National Energy Technology Laboratory Strategic Center for Natural Gas (SCVG) is and has been funding research on various applicable techniques. The WVU research team has focused on monitoring pipeline background acoustic signals generated and transmitted by gas flowing through the gas inside the pipeline. In case of a pipeline infringement, any mechanical impact on the pipe wall, or escape of high-pressure gas, generates acoustic signals traveling both up and down stream through the gas. Sudden changes in flow noise are detectable with a Portable Acoustic Monitoring Package (PAMP), developed under this contract. It incorporates a pressure compensating microphone and a signal- recording device. Direct access to the gas inside the line is obtained by mounting such a PAMP, with a 1/2 inch NPT connection, to a pipeline pressure port found near most shut-off valves. An FFT of the recorded signal subtracted by that of the background noise recorded one-second earlier appears to sufficiently isolate the infringement signal to allow source interpretation. Using cell phones for data downloading might allow a network of such 1000-psi rated PAMP's to acoustically monitor a pipeline system and be trained by neural network software to positively identify and locate any pipeline infringement.

  3. ACOUSTIC DETECTING AND LOCATING GAS PIPE LINE INFRINGEMENT

    Energy Technology Data Exchange (ETDEWEB)

    John L. Loth; Gary J. Morris; George M. Palmer; Richard Guiler; Patrick Browning

    2004-12-01

    The extensive network of high-pressure natural gas transmission pipelines covering the United States provides an important infrastructure for our energy independence. Early detection of pipeline leaks and infringements by construction equipment, resulting in corrosion fractures, presents an important aspect of our national security policy. The National Energy Technology Laboratory Strategic Center for Natural Gas (SCVG) is and has been funding research on various applicable techniques. The WVU research team has focused on monitoring pipeline background acoustic signals generated and transmitted by gas flowing through the gas inside the pipeline. In case of a pipeline infringement, any mechanical impact on the pipe wall, or escape of high-pressure gas, generates acoustic signals traveling both up and down stream through the gas. Sudden changes in flow noise are detectable with a Portable Acoustic Monitoring Package (PAMP), developed under this contract. It incorporates a pressure compensating microphone and a signal- recording device. Direct access to the gas inside the line is obtained by mounting such a PAMP, with a 1/2 inch NPT connection, to a pipeline pressure port found near most shut-off valves. An FFT of the recorded signal subtracted by that of the background noise recorded one-second earlier appears to sufficiently isolate the infringement signal to allow source interpretation. Using cell phones for data downloading might allow a network of such 1000-psi rated PAMP's to acoustically monitor a pipeline system and be trained by neural network software to positively identify and locate any pipeline infringement.

  4. Managing changes of location classes of gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Cunha, Sergio B; Sousa, Antonio Geraldo de [PETROBRAS Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2009-12-19

    Most of the gas pipeline design codes utilize a class location system, where the design safety factor and the hydrostatic test factor are determined according to the population density in the vicinities of the pipeline route. Consequently, if an operator is requested or desires to maintain an existing gas pipeline in compliance with its design code, it will reduce the operational pressure or replace pipe sections to increase the wall thickness whenever a change in location class takes place. This article introduces an alternative methodology to deal with changes in location classes of gas pipelines. Initially, selected codes that utilize location class systems are reviewed. Afterwards, a model for the area affected by an ignition following a natural gas pipeline leak is described. Finally, a methodology to determine the MAOP and third part damage mitigation measures for gas transport pipelines that underwent changes in location class is presented. (author)

  5. Venting of gas deflagrations through relief pipes

    OpenAIRE

    Ferrara, Gabriele

    2006-01-01

    Vent devices for gas and dust explosions are often ducted to safety locations by means of relief pipes for the discharge of hot combustion products or blast waves (NFPA 68, 2002). The presence of the duct is likely to increase the severity of the explosion with respect to simply vented vessels posing a problem for the proper design of this venting configuration. The phenomenology of the vented explosion is complicated as the interaction of combustion in the duct with primary combustion in...

  6. NIM gas controlled sodium heat pipe

    Science.gov (United States)

    Yan, X.; Zhang, J. T.; Merlone, A.; Duan, Y.; Wang, W.

    2013-09-01

    Gas controlled heat pipes (GCHPs) provide a uniform, stable and reproducible temperature zone to calibrate thermometers and thermocouples, and to realize defining fixed points using a calorimetric method. Therefore, to perform such investigations, a GCHP furnace using sodium as its working fluid was constructed at the National Institute of Metrology (NIM), China. Also, investigations into the thermal characteristics of the NIM gas controlled sodium heat pipe were carried out. The temperature stability over 5 hours was better than ±0.25 mK while controlling the pressure at 111250 Pa. The temperature uniformity within 14 cm from the bottom of the thermometer well was within 0.3 mK. While keeping the pressure stable at the same value, 17 temperature determinations were performed over 14 days, obtaining a temperature reproducibility of 1.27 mK. Additionally, the NIM gas controlled sodium heat pipe was compared with the sodium heat pipe produced by INRiM. The temperature in the INRiM sodium heat pipe operating at 111250 Pa was determined, obtaining a difference of 21 mK with respect to the NIM GCHP. This difference was attributed to sodium impurities, pressure controller capabilities and reproducibility, and instabilities of high temperature standard platinum resistance thermometers (HTSPRTs). Further investigations will be carried out on extending the pressure/temperature range and connecting both GCHPs to the same pressure line.

  7. High Energy Vibration for Gas Piping

    Science.gov (United States)

    Lee, Gary Y. H.; Chan, K. B.; Lee, Aylwin Y. S.; Jia, ShengXiang

    2017-07-01

    In September 2016, a gas compressor in offshore Sarawak has its rotor changed out. Prior to this change-out, pipe vibration study was carried-out by the project team to evaluate any potential high energy pipe vibration problems at the compressor’s existing relief valve downstream pipes due to process condition changes after rotor change out. This paper covers high frequency acoustic excitation (HFAE) vibration also known as acoustic induced vibration (AIV) study and discusses detailed methodologies as a companion to the Energy Institute Guidelines for the avoidance of vibration induced fatigue failure, which is a common industry practice to assess and mitigate for AIV induced fatigue failure. Such detailed theoretical studies can help to minimize or totally avoid physical pipe modification, leading to reduce offshore plant shutdown days to plant shutdowns only being required to accommodate gas compressor upgrades, reducing cost without compromising process safety.

  8. Estimation of gas wall shear stress in horizontal stratified gas-liquid pipe flow

    International Nuclear Information System (INIS)

    Newton, C.H.; Behnia, M.

    1996-01-01

    Two-phase pipe flows occur in many industrial applications, such as condensers and evaporators, chemical processing equipment, nuclear reactors, and oil pipelines. A variety of basic mechanistic flow models for predicting the pressure gradient and liquid loading characteristics of these types of flows to assist in design calculations has emerged over the past two decades, especially for the stratified and slug flow regimes. These models generally rely on a number of basic assumptions and empirical closure equations. Possibly the most notable of these relates to the evaluation of interfacial shear stresses. However, one of the most important yet least discussed assumptions used in most of these models is that the phase wall shear stresses can be accurately estimated from correlations developed for single-phase pipe flows. The object of this article is to present measurements of gas wall shear up to locations in close proximity to the gas-liquid interface for a variety of interface conditions in developed flow, and to determine the effects of the interface on average gas wall friction factors. In this context the interface may be smooth, rippled or wavy

  9. Realtime estimation of city gas pipe network damage by lateral flow of liquefied ground behind quay walls

    Energy Technology Data Exchange (ETDEWEB)

    Ishida, E.; Isoyama, R. [Japan Engineering Consultants Co., Ltd., Tokyo (Japan). Public Management Research Center; Koganemaru, K.; Shimuzu, Y. [Tokyo Gas Co. Ltd., Tokyo (Japan). Center for Disaster Management and Supply Control; Morimoto, I. [Kiso-Jiban Consultants Co. Ltd., Tokyo (Japan); Yasuda, S. [Tokyo Denki Univ., Tokyo (Japan). Dept. of Civil and Environmental Engineering

    2004-07-01

    Estimating the degree of damage to city gas pipe networks is difficult because of the lack of damage case data. This paper proposes a method for calculating the amount of earthquake-induced ground displacement at pipe node locations by constructing ground models. Data for the models was obtained from boreholes and by using a simple ground flow formula. The analysis method will make it possible to calculate the allowable limits of damage-causing factors such as ground motion and flow for different pipe network elements. The analysis procedure was conducted using a 2-dimensional liquefaction-induced flow analysis program finite element method. A real time damage estimation system for low pressure gas pipes uses ground motions having a design seismic coefficient of 0.4 in preparing strong earthquake liquefied layer thickness distribution data. Flow calculations were presented as well as a ground revetment database to replace node location data. It was concluded that achieving consistency was desirable. 7 refs., 2 tabs., 5 figs.

  10. Noncondensable gas accumulation phenomena in nuclear power plant piping

    International Nuclear Information System (INIS)

    Yamamoto, Yasushi; Aoki, Kazuyoshi; Sato, Teruaki; Shida, Akira; Ichikawa, Nagayoshi; Nishikawa, Akira; Inagaki, Tetsuhiko

    2011-01-01

    In the case of the boiling water reactor, hydrogen and oxygen slightly exist in the main steam, because these noncondensable gases are generated by the radiolytic decomposition of the reactor water. BWR plants have taken measures to prevent noncondensable gas accumulation. However, in 2001, the detonation of noncondensable gases occurred at Hamaoka-1 and Brunsbuttel, resulting in ruptured piping. The accumulation phenomena of noncondensable gases in BWR closed piping must be investigated and understood in order to prevent similar events from occurring in the future. Therefore, an experimental study on noncondensable gas accumulation was carried out. The piping geometries for testing were classified and modeled after the piping of actual BWR plants. The test results showed that 1) noncondensable gases accumulate in vertical piping, 2) it is hard for noncondensable gases to accumulate in horizontal piping, and 3) noncondensable gases accumulate under low-pressure conditions. A simple accumulation analysis method was proposed. To evaluate noncondensable gas accumulation phenomena, the three component gases were treated as a mixture. It was assumed that the condensation amount of the vapor is small, because the piping is certainly wrapped with heat insulation material. Moreover, local thermal equilibrium was assumed. This analysis method was verified using the noncondensable gas accumulation test data on branch piping with a closed top. Moreover, an experimental study on drain trap piping was carried out. The test results showed that the noncondensable gases dissolved in the drain water were discharged from the drain trap, and Henry's law could be applied to evaluate the amount of dissolved noncondensable gases in the drain water. (author)

  11. Optical aberrations in a spinning pipe gas lens

    CSIR Research Space (South Africa)

    Mafusire, C

    2008-06-01

    Full Text Available If a heated pipe is rotated about its axis, a density gradient is formed which results in the pipe acting as a graded index lens. In this study the authors revisit the concept of a spinning pipe gas lens and for the first time analyse both the wave...

  12. Crack propagation and arrest simulation of X90 gas pipe

    International Nuclear Information System (INIS)

    Yang, Fengping; Huo, Chunyong; Luo, Jinheng; Li, He; Li, Yang

    2017-01-01

    To determine whether X90 steel pipe has enough crack arrest toughness or not, a damage model was suggested as crack arrest criterion with material parameters of plastic uniform percentage elongation and damage strain energy per volume. Fracture characteristic length which characterizes fracture zone size was suggested to be the largest mesh size on expected cracking path. Plastic uniform percentage elongation, damage strain energy per volume and fracture characteristic length of X90 were obtained by five kinds of tensile tests. Based on this criterion, a length of 24 m, Φ1219 × 16.3 mm pipe segment model with 12 MPa internal gas pressure was built and computed with fluid-structure coupling method in ABAQUS. Ideal gas state equation was used to describe lean gas behavior. Euler grid was used to mesh gas zone inside the pipe while Lagrangian shell element was used to mesh pipe. Crack propagation speed and gas decompression speed were got after computation. The result shows that, when plastic uniform percentage elongation is equal to 0.054 and damage strain energy per volume is equal to 0.64 J/mm"3, crack propagation speed is less than gas decompression speed, which means the simulated X90 gas pipe with 12 MPa internal pressure can arrest cracking itself. - Highlights: • A damage model was suggested as crack arrest criterion. • Plastic uniform elongation and damage strain energy density are material parameters. • Fracture characteristic length is suggested to be largest mesh size in cracking path. • Crack propagating simulation with coupling of pipe and gas was realized in ABAQUS. • A Chinese X90 steel pipe with 12 MPa internal pressure can arrest cracking itself.

  13. Investigation of Freeze and Thaw Cycles of a Gas-Charged Heat Pipe

    Science.gov (United States)

    Ku, Jentung; Ottenstein, Laura; Krimchansky, Alexander

    2012-01-01

    The traditional constant conductance heat pipes (CCHPs) currently used on most spacecraft run the risk of bursting the pipe when the working fluid is frozen and later thawed. One method to avoid pipe bursting is to use a gas-charged heat pipe (GCHP) that can sustain repeated freeze/thaw cycles. The construction of the GCHP is similar to that of the traditional CCHP except that a small amount of non-condensable gas (NCG) is introduced and a small length is added to the CCHP condenser to serve as the NCG reservoir. During the normal operation, the NCG is mostly confined to the reservoir, and the GCHP functions as a passive variable conductance heat pipe (VCHP). When the liquid begins to freeze in the condenser section, the NCG will expand to fill the central core of the heat pipe, and ice will be formed only in the grooves located on the inner surface of the heat pipe in a controlled fashion. The ice will not bridge the diameter of the heat pipe, thus avoiding the risk of pipe bursting during freeze/thaw cycles. A GCHP using ammonia as the working fluid was fabricated and then tested inside a thermal vacuum chamber. The GCHP demonstrated a heat transport capability of more than 200W at 298K as designed. Twenty-seven freeze/thaw cycles were conducted under various conditions where the evaporator temperature ranged from 163K to 253K and the condenser/reservoir temperatures ranged from 123K to 173K. In all tests, the GCHP restarted without any problem with heat loads between 10W and 100W. No performance degradation was noticed after 27 freeze/thaw cycles. The ability of the GCHP to sustain repeated freeze/thaw cycles was thus successfully demonstrated.

  14. CFD model of a spinning pipe gas lens

    CSIR Research Space (South Africa)

    Snedden, Glen C

    2006-07-01

    Full Text Available Slides on: Spinning Pipe Gas Lens; Focal Length; Refractive Index; Gas Dynamics; Guess at the gas dynamics; Density Profile; Flow Profile; Rosby Waves; Rayleigh–Taylor Instabilities...

  15. Spinning pipe gas lens revisited

    CSIR Research Space (South Africa)

    Mafusire, C

    2008-01-01

    Full Text Available The graded index (GRIN-like) medium generated by gas inside a heated steel pipe when rotated about its longitudinal axis has the ability to focus a laser beam. While the effective focal length of such a system has previously been studied...

  16. Experimental study on a de-noising system for gas and oil pipelines based on an acoustic leak detection and location method

    International Nuclear Information System (INIS)

    Liu, Cuiwei; Li, Yuxing; Fang, Liping; Xu, Minghai

    2017-01-01

    To protect the pipelines from significant danger, the acoustic leak detection and location method for oil and gas pipelines is studied, and a de-noising system is established to extract leakage characteristics from signals. A test loop for gas and oil is established to carry out experiments. First, according to the measured signals, fitting leakage signals are obtained, and then, the objective signals are constructed by adding noises to the fitting signals. Based on the proposed evaluation indexes, the filtering methods are then applied to process the constructed signals and the de-noising system is established. The established leakage extraction system is validated and then applied to process signals measured in gas pipelines that include a straight pipe, elbow pipe and reducing pipe. The leak detection and location is carried out effectively. Finally, the system is applied to process signals measured in water pipelines. The results demonstrate that the proposed de-noising system is effective at extracting leakage signals from measured signals and that the proposed leak detection and location method has a higher detection sensitivity and localization accuracy. For a pipeline with an inner diameter of 42 mm, the smallest leakage orifice that can be detected is 0.1 mm for gas and water and the largest location error is 0.874% for gas and 0.176% for water. - Highlights: • Three evaluation indexes are proposed: SNR, RMSE and ALPD. • The de-noising system is established in the gas and oil pipelines. • The established system is used for gas pipeline effectively, including interference pipes. • The established de-noising system is used for water pipeline effectively.

  17. Demonstration and Validation of Stainless Steel Materials for Critical Above Grade Piping in Highly Corrosive Locations

    Science.gov (United States)

    2017-05-01

    materials for corroded fire-suppression water pipelines at the Chimu- Wan tank farms on Okinawa Island, Japan. 1.3 Approach Members of the research... pipelines . As such, detailed designs for supports and seismic analysis were not required. Calculations were performed in accordance with ASME B31.3...The pipeline was assembled using tungsten inert gas (TIG) arc welding. Pipe segments were joined at a stationary location to form longer seg

  18. Gage for gas flow measurement especially in gas-suction pipes

    International Nuclear Information System (INIS)

    Renner, K.; Stegmanns, W.

    1978-01-01

    The gage utilizes the differential pressure given by a differential pressure producer to generate, in a bypass, a partial gas flow measured by means of a direct-reading anemometer of windmill type. The partial gas flow is generated between pressure pick-up openings in the gas-suction pipe in front of a venturi insert and pressure pick-up openings at the bottleneck of the venturi insert. The reading of the anemometer is proportional to the main gas flow and independent of the variables of state and the properties of the gases to be measured. (RW) [de

  19. The flows structure in unsteady gas flow in pipes with different cross-sections

    OpenAIRE

    Plotnikov Leonid; Nevolin Alexandr; Nikolaev Dmitrij

    2017-01-01

    The results of numerical simulation and experimental study of the structure of unsteady flows in pipes with different cross sections are presented in the article. It is shown that the unsteady gas flow in a circular pipe is axisymmetric without secondary currents. Steady vortex structures (secondary flows) are observed in pipes with cross sections in the form of a square and an equilateral triangle. It was found that these secondary flows have a significant impact on gas flows in pipes of com...

  20. Film behaviour of vertical gas-liquid flow in a large diameter pipe

    OpenAIRE

    Zangana, Mohammed Haseeb Sedeeq

    2011-01-01

    Gas-liquid flow commonly occurs in oil and gas production and processing system. Large diameter vertical pipes can reduce pressure drops and so minimize operating costs. However, there is a need for research on two-phase flow in large diameter pipes to provide confidence to designers of equipments such as deep water risers. In this study a number of experimental campaigns were carried out to measure pressure drop, liquid film thickness and wall shear in 127mm vertical pipe. Total pressur...

  1. A study of stratified gas-liquid pipe flow

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, George W.

    2005-07-01

    This work includes both theoretical modelling and experimental observations which are relevant to the design of gas condensate transport lines. Multicomponent hydrocarbon gas mixtures are transported in pipes over long distances and at various inclinations. Under certain circumstances, the heavier hydrocarbon components and/or water vapour condense to form one or more liquid phases. Near the desired capacity, the liquid condensate and water is efficiently transported in the form of a stratified flow with a droplet field. During operating conditions however, the flow rate may be reduced allowing liquid accumulation which can create serious operational problems due to large amounts of excess liquid being expelled into the receiving facilities during production ramp-up or even in steady production in severe cases. In particular, liquid tends to accumulate in upward inclined sections due to insufficient drag on the liquid from the gas. To optimize the transport of gas condensates, a pipe diameters should be carefully chosen to account for varying flow rates and pressure levels which are determined through the knowledge of the multiphase flow present. It is desirable to have a reliable numerical simulation tool to predict liquid accumulation for various flow rates, pipe diameters and pressure levels which is not presently accounted for by industrial flow codes. A critical feature of the simulation code would include the ability to predict the transition from small liquid accumulation at high flow rates to large liquid accumulation at low flow rates. A semi-intermittent flow regime of roll waves alternating with a partly backward flowing liquid film has been observed experimentally to occur for a range of gas flow rates. Most of the liquid is transported in the roll waves. The roll wave regime is not well understood and requires fundamental modelling and experimental research. The lack of reliable models for this regime leads to inaccurate prediction of the onset of

  2. Suitability of pipeline material for buried gas and water piping

    Energy Technology Data Exchange (ETDEWEB)

    Funk, R

    1976-01-01

    Following a brief review of the development of the individual pipe materials and their use in the field of gas and water supply, the various stressing possibilities are dealt with. The corrosion influences from inside and outside, the material specifically for internal and external insulation, as well as the stressing due to sediments, are particularly brought out in this connection. A few remarks on the pressure pipes made of ductile cast iron, steel, reinforced concrete, asbestos cement and plastics are followed by comparisons with representations on material parameters to be proved, safety factors, tensile and pressure resistance, breaking tension and stress-strain diagram, wall thicknesses, friction losses, reactions depending on the E. modulus and distribution of the single pipe materials in the gas and water supply.

  3. Numerical simulation for gas-liquid two-phase flow in pipe networks

    International Nuclear Information System (INIS)

    Li Xiaoyan; Kuang Bo; Zhou Guoliang; Xu Jijun

    1998-01-01

    The complex pipe network characters can not directly presented in single phase flow, gas-liquid two phase flow pressure drop and void rate change model. Apply fluid network theory and computer numerical simulation technology to phase flow pipe networks carried out simulate and compute. Simulate result shows that flow resistance distribution is non-linear in two phase pipe network

  4. Startup analysis for a high temperature gas loaded heat pipe

    Science.gov (United States)

    Sockol, P. M.

    1973-01-01

    A model for the rapid startup of a high-temperature gas-loaded heat pipe is presented. A two-dimensional diffusion analysis is used to determine the rate of energy transport by the vapor between the hot and cold zones of the pipe. The vapor transport rate is then incorporated in a simple thermal model of the startup of a radiation-cooled heat pipe. Numerical results for an argon-lithium system show that radial diffusion to the cold wall can produce large vapor flow rates during a rapid startup. The results also show that startup is not initiated until the vapor pressure p sub v in the hot zone reaches a precise value proportional to the initial gas pressure p sub i. Through proper choice of p sub i, startup can be delayed until p sub v is large enough to support a heat-transfer rate sufficient to overcome a thermal load on the heat pipe.

  5. Severe slugging in gas-liquid two-phase pipe flow

    NARCIS (Netherlands)

    Malekzadeh, R.

    2012-01-01

    transportation facilities. In an offshore oil and gas production facility, pipeline-riser systems are required to transport two-phase hydrocarbons from subsurface oil and gas wells to a central production platform. Severe slugs reaching several thousands pipe diameters may occur when transporting

  6. A LOW-COST GPR GAS PIPE & LEAK DETECTOR

    Energy Technology Data Exchange (ETDEWEB)

    David Cist; Alan Schutz

    2005-03-30

    A light-weight, easy to use ground penetrating radar (GPR) system for tracking metal/non-metal pipes has been developed. A pre-production prototype instrument has been developed whose production cost and ease of use should fit important market niches. It is a portable tool which is swept back and forth like a metal detector and which indicates when it goes over a target (metal, plastic, concrete, etc.) and how deep it is. The innovation of real time target detection frees the user from having to interpret geophysical data and instead presents targets as dots on the screen. Target depth is also interpreted automatically, relieving the user of having to do migration analysis. In this way the user can simply walk around looking for targets and, by ''connecting the dots'' on the GPS screen, locate and follow pipes in real time. This is the first tool known to locate metal and non-metal pipes in real time and map their location. This prototype design is similar to a metal detector one might use at the beach since it involves sliding a lightweight antenna back and forth over the ground surface. The antenna is affixed to the end of an extension that is either clipped to or held by the user. This allows him to walk around in any direction, either looking for or following pipes with the antenna location being constantly recorded by the positioning system. Once a target appears on the screen, the user can locate by swinging the unit to align the cursor over the dot. Leak detection was also a central part of this project, and although much effort was invested into its development, conclusive results are not available at the time of the writing of this document. Details of the efforts that were made as a part of this cooperative agreement are presented.

  7. Continuous wavelet transform analysis and modal location analysis acoustic emission source location for nuclear piping crack growth monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Mohd, Shukri [Nondestructive Testing Group, Industrial Technology Division, Malaysian Nuclear Agency, 43000, Bangi, Selangor (Malaysia); Holford, Karen M.; Pullin, Rhys [Cardiff School of Engineering, Cardiff University, Queen' s Buildings, The Parade, CARDIFF CF24 3AA (United Kingdom)

    2014-02-12

    Source location is an important feature of acoustic emission (AE) damage monitoring in nuclear piping. The ability to accurately locate sources can assist in source characterisation and early warning of failure. This paper describe the development of a novelAE source location technique termed 'Wavelet Transform analysis and Modal Location (WTML)' based on Lamb wave theory and time-frequency analysis that can be used for global monitoring of plate like steel structures. Source location was performed on a steel pipe of 1500 mm long and 220 mm outer diameter with nominal thickness of 5 mm under a planar location test setup using H-N sources. The accuracy of the new technique was compared with other AE source location methods such as the time of arrival (TOA) techniqueand DeltaTlocation. Theresults of the study show that the WTML method produces more accurate location resultscompared with TOA and triple point filtering location methods. The accuracy of the WTML approach is comparable with the deltaT location method but requires no initial acoustic calibration of the structure.

  8. Continuous wavelet transform analysis and modal location analysis acoustic emission source location for nuclear piping crack growth monitoring

    International Nuclear Information System (INIS)

    Shukri Mohd

    2013-01-01

    Full-text: Source location is an important feature of acoustic emission (AE) damage monitoring in nuclear piping. The ability to accurately locate sources can assist in source characterisation and early warning of failure. This paper describe the development of a novelAE source location technique termed Wavelet Transform analysis and Modal Location (WTML) based on Lamb wave theory and time-frequency analysis that can be used for global monitoring of plate like steel structures. Source location was performed on a steel pipe of 1500 mm long and 220 mm outer diameter with nominal thickness of 5 mm under a planar location test setup using H-N sources. The accuracy of the new technique was compared with other AE source location methods such as the time of arrival (TOA) technique and DeltaTlocation. The results of the study show that the WTML method produces more accurate location results compared with TOA and triple point filtering location methods. The accuracy of the WTML approach is comparable with the deltaT location method but requires no initial acoustic calibration of the structure. (author)

  9. Continuous wavelet transform analysis and modal location analysis acoustic emission source location for nuclear piping crack growth monitoring

    International Nuclear Information System (INIS)

    Mohd, Shukri; Holford, Karen M.; Pullin, Rhys

    2014-01-01

    Source location is an important feature of acoustic emission (AE) damage monitoring in nuclear piping. The ability to accurately locate sources can assist in source characterisation and early warning of failure. This paper describe the development of a novelAE source location technique termed 'Wavelet Transform analysis and Modal Location (WTML)' based on Lamb wave theory and time-frequency analysis that can be used for global monitoring of plate like steel structures. Source location was performed on a steel pipe of 1500 mm long and 220 mm outer diameter with nominal thickness of 5 mm under a planar location test setup using H-N sources. The accuracy of the new technique was compared with other AE source location methods such as the time of arrival (TOA) techniqueand DeltaTlocation. Theresults of the study show that the WTML method produces more accurate location resultscompared with TOA and triple point filtering location methods. The accuracy of the WTML approach is comparable with the deltaT location method but requires no initial acoustic calibration of the structure

  10. Leak before break analysis for cracking at multiple weld locations in BWR recirculation piping

    International Nuclear Information System (INIS)

    Zahoor, A.; Gamble, R.

    1984-01-01

    Periodically over the past decade, intergranular stress corrosion cracking (IGSCC) has been found in austenitic stainless steel piping at Boiling Water Reactor facilities. The effect of IGSCC on piping integrity has been evaluated previously in various BWR Owners Group and NRC studies. In these studies, the analyses were performed assuming the presence of a crack at a single weld location in the pipe run. The purpose of this investigation was to compare the leak rate and potential for unstable crack extension associated with a throughwall crack for the following two conditions in a BWR recirculation system: (1) the recirculation piping contains part through cracks at multiple weld locations and a single throughwall crack, and (2) the piping contains only a throughwall crack at one weld location. Two type BWRs were evaluated; namely, the ring header and five individual loop designs. The results from the analyses indicate that the potential for unstable crack extension at large bending loads, and leak rate at normal operation are not affected by the presence of part through cracks at multiple weld locations. The differences in the respective calculated L/sub eff/ and leak rates for the single and multiply cracked conditions are less than 2%

  11. 33 CFR 127.1101 - Piping systems.

    Science.gov (United States)

    2010-07-01

    ...) WATERFRONT FACILITIES WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS Waterfront Facilities Handling Liquefied Hazardous Gas Design and Construction § 127.1101 Piping systems... pipeline on a pier or wharf must be located so that it is not exposed to physical damage from vehicular...

  12. Characterisation of a spinning pipe gas lens using a Shack–Hartmann wavefront sensor

    CSIR Research Space (South Africa)

    Mafusire, C

    2007-01-01

    Full Text Available A heated horizontal spinning pipe causes gases inside it to assume dynamics resulting in a graded index lens – a spinning pipe gas lens (SPGL). A CFD model is presented which shows that gas exchanges of the SPGL with the surroundings resulting in a...

  13. Cryogenic and Gas System Piping Pressure Tests (A Collection of PT Permits)

    International Nuclear Information System (INIS)

    Rucinski, Russell A.

    2002-01-01

    This engineering note is a collection of pipe pressure testing documents for various sections of piping for the D-Zero cryogenic and gas systems. High pressure piping must conform with FESHM chapter 5031.1. Piping lines with ratings greater than 150 psig have a pressure test done before the line is put into service. These tests require the use of pressure testing permits. It is my intent that all pressure piping over which my group has responsibility conforms to the chapter. This includes the liquid argon and liquid helium and liquid nitrogen cryogenic systems. It also includes the high pressure air system, and the high pressure gas piping of the WAMUS and MDT gas systems. This is not an all inclusive compilation of test documentation. Some piping tests have their own engineering note. Other piping section test permits are included in separate safety review documents. So if it isn't here, that doesn't mean that it wasn't tested. D-Zero has a back up air supply system to add reliability to air compressor systems. The system includes high pressure piping which requires a review per FESHM 5031.1. The core system consists of a pressurized tube trailer, supply piping into the building and a pressure reducing regulator tied into the air compressor system discharge piping. Air flows from the trailer if the air compressor discharge pressure drops below the regulator setting. The tube trailer is periodically pumped back up to approximately 2000 psig. A high pressure compressor housed in one of the exterior buildings is used for that purpose. The system was previously documented, tested and reviewed for Run I, except for the recent addition of piping to and from the high pressure compressor. The following documents are provided for review of the system: (1) Instrument air flow schematic, drg. 3740.000-ME-273995 rev. H; (2) Component list for air system; (3) Pressure testing permit for high pressure piping; (4) Documentation from Run I contained in D-Zero Engineering note

  14. The flows structure in unsteady gas flow in pipes with different cross-sections

    Science.gov (United States)

    Plotnikov, Leonid; Nevolin, Alexandr; Nikolaev, Dmitrij

    2017-10-01

    The results of numerical simulation and experimental study of the structure of unsteady flows in pipes with different cross sections are presented in the article. It is shown that the unsteady gas flow in a circular pipe is axisymmetric without secondary currents. Steady vortex structures (secondary flows) are observed in pipes with cross sections in the form of a square and an equilateral triangle. It was found that these secondary flows have a significant impact on gas flows in pipes of complex configuration. On the basis of experimental researches it is established that the strong oscillatory phenomena exist in the inlet pipe of the piston engine arising after the closing of the intake valve. The placement of the profiled plots (with a cross section of a square or an equilateral triangle) in the intake pipe leads to the damping of the oscillatory phenomena and a more rapid stabilization of pulsating flow. This is due to the stabilizing effect of the vortex structures formed in the corners of this configuration.

  15. The flows structure in unsteady gas flow in pipes with different cross-sections

    Directory of Open Access Journals (Sweden)

    Plotnikov Leonid

    2017-01-01

    Full Text Available The results of numerical simulation and experimental study of the structure of unsteady flows in pipes with different cross sections are presented in the article. It is shown that the unsteady gas flow in a circular pipe is axisymmetric without secondary currents. Steady vortex structures (secondary flows are observed in pipes with cross sections in the form of a square and an equilateral triangle. It was found that these secondary flows have a significant impact on gas flows in pipes of complex configuration. On the basis of experimental researches it is established that the strong oscillatory phenomena exist in the inlet pipe of the piston engine arising after the closing of the intake valve. The placement of the profiled plots (with a cross section of a square or an equilateral triangle in the intake pipe leads to the damping of the oscillatory phenomena and a more rapid stabilization of pulsating flow. This is due to the stabilizing effect of the vortex structures formed in the corners of this configuration.

  16. Wave aberrations in a spinning pipe gas lens

    CSIR Research Space (South Africa)

    Mafusire, C

    2009-06-01

    Full Text Available The graded index (GRIN-like) medium generated by a gas inside a heated pipe when it is rotated about its longitudinal axis has the ability to focus a laser beam. However, recent research has shown that the medium generated has a deleterious effect...

  17. Droplets in annular-dispersed gas-liquid pipe-flows

    NARCIS (Netherlands)

    Van 't Westende, J.M.C.

    2008-01-01

    Annular-dispersed gas-liquid pipe-flows are commonly encountered in many industrial applications, and have already been studied for many decades. However, due to the great complexity of this type of flow, there are still many phenomena that are poorly understood. The aim of this thesis is to shed

  18. An algorithm for leak locating using coupled vibration of pipe-water

    International Nuclear Information System (INIS)

    Lee, Young Sup; Yoon, Dong Jin

    2004-01-01

    Leak noise is a good source to identify the exact location of a leak point of underground water pipelines. Water leak generates broadband sound from a leak location and this sound propagation due to leak in water pipelines is not a non-dispersive wave any more because of the surrounding pipes and soil. However, the necessity of long-range detection of this leak location makes to identify low-frequency acoustic waves rather than high frequency ones. Acoustic wave propagation coupled with surrounding boundaries including cast iron pipes is theoretically analyzed and the wave velocity was confirmed with experiment. The leak locations were identified both by the Acoustic Emission (AE) method and the cross-correlation method. In a short-range distance, both the AE method and cross-correlation method are effective to detect leak position. However, the detection for a long-range distance required a lower frequency range accelerometers only because higher frequency waves were attenuated very quickly with the increase of propagation paths. Two algorithms for the cross-correlation function were suggested, and a long-range detection has been achieved at real underground water pipelines longer than 300m

  19. Corrective actions to gas accumulation in safety injection system pipings of PWRs and gas void detection method

    International Nuclear Information System (INIS)

    Maki, Nobuo

    2000-01-01

    In the US, gas accumulation events of safety injection systems of PWRs during plant operation are continuously reported. As the events may result in loss of safety function, the USNRC is alerting licensees by Information Notices. The cause of the events is coolant leakage to interfacing systems with lower pressure, or gas dissolution of primary coolant by partial pressure drop. In this study, it was clarified by the evaluation of the cause of the events of US plants, gas accumulation in piping between an accumulator and Residual Heat Removal System should be quantitatively investigated regarding Japanese plants. Also, effectiveness of ultrasonic testing which is used for monthly gas accumulation surveillance in US plants was demonstrated using a model loop. In addition, the method was confirmed applicable by an experiment carried out at INSS to detect cavitation voids in piping systems. (author)

  20. Residual lifetime assessment of uPVC gas pipes

    NARCIS (Netherlands)

    Visser, H.A.

    2010-01-01

    The Dutch gas distribution network consists of about 20% (22,500 km) of unplasticised poly(vinyl chloride) (uPVC) pipes, most of which have been installed from the mid-sixties up to the mid-seventies of the previous century and have been in service ever since. In the next decade the specified

  1. Detection of elastic waves for the leakage locating of underground water supply pipes

    International Nuclear Information System (INIS)

    Lee, Young Sup; Yoon, Dong Jin; Jeong, Jung Chae; Lee, Seung Seok

    2003-01-01

    Leaks in underground pipelines can cause social, environmental and economical problems. One of a good countermeasures of leaks is to find and repair of leak points of pipes. Leak noise is a good source to identify the location of leak points of pipelines. Although there have been several methods to detect the leak location with leak noise, such as listening rods, hydrophones or ground microphones, they were not so efficient tools. In this paper, two accelerometers are used to detect leak locations which could provide an easier and efficient method. The filtering, signal processing and algorithm is described for the detection of leak location. A 120 m-long pipeline system for experiment is installed and the results with the system show that the algorithm with the two accelerometers gives very accurate pinpointing of leaks. Theoretical analysis of sound wave propagation speed in underground pipes is also described.

  2. Detection of elastic waves for the leakage locating of underground water supply pipes

    International Nuclear Information System (INIS)

    Lee, Young Sup; Yoon, Dong Jin; Jeong, Jung Chae; Lee, Seung Seok

    2003-01-01

    Leaks in underground pipelines can cause social, environmental and economical problems. One of a good countermeasures of leaks is to find and repair of leak points of pipes. Leak noise is good source to identify the location of leak points of pipelines. Although there have been several methods to detect the leak location with leak noise, such as listening rods, hydrophones or ground microphones, they were not so efficient tools. In this paper, two accelerometers are used to detect leak locations which could provide an easier and efficient method. The filtering signal processing and algorithm is described for the detection of leak location. A 120 m-long pipeline system for experiment is installed and the results with the system show that the algorithm with the two accelerometers gives very accurate pinpointing of leaks. Theoretical analysis of sound wave propagation speed in underground pipes is also described.

  3. Detection system for location of fuel pebbles transported in pipes in a pebble-bed reactor based on vibration signal processing

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Hongbing, E-mail: liuhb07@mails.tsinghua.edu.cn [Department of Mechanical Engineering, Tsinghua University, Beijing 100084 (China); Key Laboratory for Advanced Materials Processing Technology, Ministry of Education P. R. China, Beijing 100084 (China); Du, Dong, E-mail: dudong@tsinghua.edu.cn [Department of Mechanical Engineering, Tsinghua University, Beijing 100084 (China); Key Laboratory for Advanced Materials Processing Technology, Ministry of Education P. R. China, Beijing 100084 (China); Huang, An; Chang, Baohua; Han, Zandong [Department of Mechanical Engineering, Tsinghua University, Beijing 100084 (China); Key Laboratory for Advanced Materials Processing Technology, Ministry of Education P. R. China, Beijing 100084 (China); He, Ayada [Shanghai Electric Power Generation Group Shanghai Generator Works, Shanghai 200240 (China)

    2016-08-15

    Highlights: • A detection system for locations of pebbles transported in pipes is introduced. • The detection system is based on vibration signal processing, which is original. • The characteristics of the vibration signals of the pipe are analyzed. • The experiment shows that the detection results are accurate. • The research provides an important basis for the design of the reactor. - Abstract: Pebble-bed high temperature gas-cooled reactors have many advantages such as inherent safety, high efficiency, etc., and have been considered as a candidate for Generation IV nuclear reactors. During the operation of the reactor, there are thousands of fuel pebbles transported in the pipes outside the core by gravity and helium flow. The pattern of the pipes which consist of straight and arc sections is very complex. When a fuel pebble is transported, it will constantly collide with the pipes, especially in the arc sections. The collisions will lead to the vibration of the pipes. This paper aims to provide a detection system for the location of fuel pebbles transported in pipes in a pebble-bed reactor based on vibration signal processing. Before the reactor is running, the system acquires the vibration signals of several key sections by sensors. Then the frequency characteristics of the signals are obtained by joint time–frequency analysis. When the reactor is running, the system detects the signals and processes them based on their frequency characteristics in real time. According to the results of the processing, the system can correctly judge whether the fuel pebble has passed through the section and records the time of the passing. The experiment validates the accuracy and reliability of the detection results. In this way, the operational condition of the reactor can be monitored so that the normal running of the reactor can be ensured. Additionally, the detection data are of great significance to the evaluation and optimization of the reactor performance

  4. Detection system for location of fuel pebbles transported in pipes in a pebble-bed reactor based on vibration signal processing

    International Nuclear Information System (INIS)

    Liu, Hongbing; Du, Dong; Huang, An; Chang, Baohua; Han, Zandong; He, Ayada

    2016-01-01

    Highlights: • A detection system for locations of pebbles transported in pipes is introduced. • The detection system is based on vibration signal processing, which is original. • The characteristics of the vibration signals of the pipe are analyzed. • The experiment shows that the detection results are accurate. • The research provides an important basis for the design of the reactor. - Abstract: Pebble-bed high temperature gas-cooled reactors have many advantages such as inherent safety, high efficiency, etc., and have been considered as a candidate for Generation IV nuclear reactors. During the operation of the reactor, there are thousands of fuel pebbles transported in the pipes outside the core by gravity and helium flow. The pattern of the pipes which consist of straight and arc sections is very complex. When a fuel pebble is transported, it will constantly collide with the pipes, especially in the arc sections. The collisions will lead to the vibration of the pipes. This paper aims to provide a detection system for the location of fuel pebbles transported in pipes in a pebble-bed reactor based on vibration signal processing. Before the reactor is running, the system acquires the vibration signals of several key sections by sensors. Then the frequency characteristics of the signals are obtained by joint time–frequency analysis. When the reactor is running, the system detects the signals and processes them based on their frequency characteristics in real time. According to the results of the processing, the system can correctly judge whether the fuel pebble has passed through the section and records the time of the passing. The experiment validates the accuracy and reliability of the detection results. In this way, the operational condition of the reactor can be monitored so that the normal running of the reactor can be ensured. Additionally, the detection data are of great significance to the evaluation and optimization of the reactor performance

  5. Transition of Gas-Liquid Stratified Flow in Oil Transport Pipes

    Directory of Open Access Journals (Sweden)

    D. Lakehal

    2011-12-01

    Full Text Available Large-Scale Simulation results of the transition of a gas-liquid stratified flow to slug flow regime in circular 3D oil transport pipes under turbulent flow conditions expressed. Free surface flow in the pipe is treated using the Level Set method. Turbulence is approached via the LES and VLES methodologies extended to interfacial two-phase flows. It is shown that only with the Level Set method the flow transition can be accurately predicted, better than with the two-fluid phase-average model. The transition from stratified to slug flow is found to be subsequent to the merging of the secondary wave modes created by the action of gas shear (short waves with the first wave mode (high amplitude long wave. The model is capable of predicting global flow features like the onset of slugging and slug speed. In the second test case, the model predicts different kinds of slugs, the so-called operating slugs formed upstream that fill entirely the pipe with water slugs of length scales of the order of 2-4 D, and lower size (1-1.5 D disturbance slugs, featuring lower hold-up (0.8-0.9. The model predicts well the frequency of slugs. The simulations revealed important parameter effects on the results, such as two-dimensionality, pipe length, and water holdup.

  6. Suggestions to leak prevention in Fortaleza's natural gas piping system; Sugestoes para a prevencao de vazamentos de gas natural canalizado na regiao metropolitana de Fortaleza

    Energy Technology Data Exchange (ETDEWEB)

    Teles, Marcus de Barros [Agencia Reguladora de Servicos Publicos Delegados do Estado do Ceara (ARCE), Fortaleza, CE (Brazil)

    2004-07-01

    Leaks are the bigger problem in health, safety and environmental when the subject is gas distribution piping systems. Specially in high density human regions, like in the majority districts of Fortaleza, safety have to be the higher priority to the gas company responsible for the gas distribution piping systems. Leaks are able to cause accidents or incidents, depending on the circumstances which they happen. In order to be control the situation and overcome the luck factor, leaks must be previously avoided by the application of some security requirements. This paper present some suggestions to natural gas leak prevention in the Fortaleza's metropolitan region pipeline systems. First, the piping systems are analysed, observing the risk regions. Then, safety actions and basic requirements to avoid pipe corrosion are presented in order to improve safety in the gas distribution piping systems of Fortaleza's metropolitan region. (author)

  7. Pipe clamp effects on thin-walled pipe design

    International Nuclear Information System (INIS)

    Lindquist, M.R.

    1980-01-01

    Clamp induced stresses in FFTF piping are sufficiently large to require structural assessment. The basic principles and procedures used in analyzing FFTF piping at clamp support locations for compliance with ASME Code rules are given. Typical results from a three-dimensional shell finite element pipe model with clamp loads applied over the clamp/pipe contact area are shown. Analyses performed to categorize clamp induced piping loads as primary or secondary in nature are described. The ELCLAMP Computer Code, which performs analyses at clamp locations combining clamp induced stresses with stresses from overall piping system loads, is discussed. Grouping and enveloping methods to reduce the number of individual clamp locations requiring analysis are described

  8. Leak Detection and Location of Water Pipes Using Vibration Sensors and Modified ML Prefilter.

    Science.gov (United States)

    Choi, Jihoon; Shin, Joonho; Song, Choonggeun; Han, Suyong; Park, Doo Il

    2017-09-13

    This paper proposes a new leak detection and location method based on vibration sensors and generalised cross-correlation techniques. Considering the estimation errors of the power spectral densities (PSDs) and the cross-spectral density (CSD), the proposed method employs a modified maximum-likelihood (ML) prefilter with a regularisation factor. We derive a theoretical variance of the time difference estimation error through summation in the discrete-frequency domain, and find the optimal regularisation factor that minimises the theoretical variance in practical water pipe channels. The proposed method is compared with conventional correlation-based techniques via numerical simulations using a water pipe channel model, and it is shown through field measurement that the proposed modified ML prefilter outperforms conventional prefilters for the generalised cross-correlation. In addition, we provide a formula to calculate the leak location using the time difference estimate when different types of pipes are connected.

  9. Leak Detection and Location of Water Pipes Using Vibration Sensors and Modified ML Prefilter

    Directory of Open Access Journals (Sweden)

    Jihoon Choi

    2017-09-01

    Full Text Available This paper proposes a new leak detection and location method based on vibration sensors and generalised cross-correlation techniques. Considering the estimation errors of the power spectral densities (PSDs and the cross-spectral density (CSD, the proposed method employs a modified maximum-likelihood (ML prefilter with a regularisation factor. We derive a theoretical variance of the time difference estimation error through summation in the discrete-frequency domain, and find the optimal regularisation factor that minimises the theoretical variance in practical water pipe channels. The proposed method is compared with conventional correlation-based techniques via numerical simulations using a water pipe channel model, and it is shown through field measurement that the proposed modified ML prefilter outperforms conventional prefilters for the generalised cross-correlation. In addition, we provide a formula to calculate the leak location using the time difference estimate when different types of pipes are connected.

  10. Thermal Analysis of the Divertor Primary Heat Transfer System Piping During the Gas Baking Process

    International Nuclear Information System (INIS)

    Yoder, Graydon L. Jr.; Harvey, Karen; Ferrada, Juan J.

    2011-01-01

    A preliminary analysis has been performed examining the temperature distribution in the Divertor Primary Heat Transfer System (PHTS) piping and the divertor itself during the gas baking process. During gas baking, it is required that the divertor reach a temperature of 350 C. Thermal losses in the piping and from the divertor itself require that the gas supply temperature be maintained above that temperature in order to ensure that all of the divertor components reach the required temperature. The analysis described in this report was conducted in order to estimate the required supply temperature from the gas heater.

  11. CFD analysis of gas explosions vented through relief pipes.

    Science.gov (United States)

    Ferrara, G; Di Benedetto, A; Salzano, E; Russo, G

    2006-09-21

    Vent devices for gas and dust explosions are often ducted to safe locations by means of relief pipes. However, the presence of the duct increases the severity of explosion if compared to simply vented vessels (i.e. compared to cases where no duct is present). Besides, the identification of the key phenomena controlling the violence of explosion has not yet been gained. Multidimensional models coupling, mass, momentum and energy conservation equations can be valuable tools for the analysis of such complex explosion phenomena. In this work, gas explosions vented through ducts have been modelled by a two-dimensional (2D) axi-symmetric computational fluid dynamic (CFD) model based on the unsteady Reynolds Averaged Navier Stokes (RANS) approach in which the laminar, flamelet and distributed combustion models have been implemented. Numerical test have been carried out by varying ignition position, duct diameter and length. Results have evidenced that the severity of ducted explosions is mainly driven by the vigorous secondary explosion occurring in the duct (burn-up) rather than by the duct flow resistance or acoustic enhancement. Moreover, it has been found out that the burn-up affects explosion severity due to the reduction of venting rate rather than to the burning rate enhancement through turbulization.

  12. Application of ultrasonic testing technique to detect gas accumulation in important pipings for pressurized water reactors safety

    Energy Technology Data Exchange (ETDEWEB)

    Fushimi, Yasuyuki [Inst. of Nuclear Safety System Inc., Mihama, Fukui (Japan)

    2002-09-01

    Since 1988, the USNRC has pointed out that gas-binding events might occur at high head safety injection (HHSI) pumps of pressurized water reactors (PWRs). In Japanese PWR plants, corrective actions were taken in response to gas-binding events that occurred on HHSI pumps in the USA, so no gas accumulation event has been reported so far. However, when venting frequency is prolonged with operating cycle extension, the probability of gas accumulation in pipings may increase as in the USA. The purpose of this study was to establish a technique to identify gas accumulation and to measure the gas volume accurately. Taking dominant causes of the gas-binding events in the USA into consideration, we pointed out the following sections in the Japanese PWRs where gas srtipping and/or gas accumulation might occur: residual heat removal system pipings and charging/safety injection pump minimum flow line. Then an ultrasonic testing technique, adopted to identify gas accumulation in the USA, was applied to those sections of the typical Japanese PWR. Consequently, no gas accumulation was found in those pipings. (author)

  13. Long liquid slugs in stratified gas/liquid flow in horizontal and slightly inclined pipes

    NARCIS (Netherlands)

    Kadri, U.

    2009-01-01

    Long liquid slugs reaching several hundreds pipe diameter may appear when transporting gas and liquid in horizontal and near horizontal pipes. The long slugs cause system vibration and separation difficulties that may lead to operational failures. Identifying and predicting the time and length

  14. 46 CFR 61.15-10 - Liquefied-petroleum-gas piping for heating and cooking.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Liquefied-petroleum-gas piping for heating and cooking. 61.15-10 Section 61.15-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE... piping for heating and cooking. (a) Leak tests as described in paragraph (b) of this section shall be...

  15. Formation of Sclerotic Hydrate Deposits in a Pipe for Extraction of a Gas from a Dome Separator

    Science.gov (United States)

    Urazov, R. R.; Chiglinstev, I. A.; Nasyrov, A. A.

    2017-09-01

    The theory of formation of hydrate deposits on the walls of a pipe for extraction of a gas from a dome separator designed for the accident-related collection of hydrocarbons on the ocean floor is considered. A mathematical model has been constructed for definition of a steady movement of a gas in such a pipe with gas-hydrate deposition under the conditions of changes in the velocity, temperature, pressure, and moisture content of the gas flow.

  16. Measurement of gas-liquid two-phase flow in micro-pipes by a capacitance sensor.

    Science.gov (United States)

    Ji, Haifeng; Li, Huajun; Huang, Zhiyao; Wang, Baoliang; Li, Haiqing

    2014-11-26

    A capacitance measurement system is developed for the measurement of gas-liquid two-phase flow in glass micro-pipes with inner diameters of 3.96, 2.65 and 1.56 mm, respectively. As a typical flow regime in a micro-pipe two-phase flow system, slug flow is chosen for this investigation. A capacitance sensor is designed and a high-resolution and high-speed capacitance measurement circuit is used to measure the small capacitance signals based on the differential sampling method. The performance and feasibility of the capacitance method are investigated and discussed. The capacitance signal is analyzed, which can reflect the voidage variation of two-phase flow. The gas slug velocity is determined through a cross-correlation technique using two identical capacitance sensors. The simulation and experimental results show that the presented capacitance measurement system is successful. Research work also verifies that the capacitance sensor is an effective method for the measurement of gas liquid two-phase flow parameters in micro-pipes.

  17. Feasibility of Locating Leakages in Sewage Pressure Pipes Using the Distributed Temperature Sensing Technology.

    Science.gov (United States)

    Apperl, Benjamin; Pressl, Alexander; Schulz, Karsten

    2017-01-01

    The cost effective maintenance of underwater pressure pipes for sewage disposal in Austria requires the detection and localization of leakages. Extrusion of wastewater in lakes can heavily influence the water and bathing quality of surrounding waters. The Distributed Temperature Sensing (DTS) technology is a widely used technique for oil and gas pipeline leakage detection. While in pipeline leakage detection, fiber optic cables are installed permanently at the outside or within the protective sheathing of the pipe; this paper aims at testing the feasibility of detecting leakages with temporary introduced fiber optic cable inside the pipe. The detection and localization were tested in a laboratory experiment. The intrusion of water from leakages into the pipe, producing a local temperature drop, served as indicator for leakages. Measurements were taken under varying measurement conditions, including the number of leakages as well as the positioning of the fiber optic cable. Experiments showed that leakages could be detected accurately with the proposed methodology, when measuring resolution, temperature gradient and measurement time were properly selected. Despite the successful application of DTS for leakage detection in this lab environment, challenges in real system applications may arise from temperature gradients within the pipe system over longer distances and the placement of the cable into the real pipe system.

  18. D-day for gas pipes to Grenland; D-dag for gassroer til Grenland

    Energy Technology Data Exchange (ETDEWEB)

    Aadland, Camilla; Sprenger, Mona; Hovland, Ketil Malkens

    2009-07-01

    Many years of fight in order to get natural gas to Grenland might be over at 1. May 2009. Yara and Statoil have to get an agreement, if the gas pipe 'Skanled' shall come to Norway. (AG) map., ills

  19. Residual stress measurements in coil, linepipe and girth welded pipe

    International Nuclear Information System (INIS)

    Law, M.; Prask, H.; Luzin, V.; Gnaeupel-Herold, T.

    2006-01-01

    Residual stresses in gas pipelines come from forming operations in producing the coil and pipe, seam welding the pipe, and girth welding pipes together to form a gas pipeline. Welding is used extensively in gas pipelines, the welds are made without post weld heat treatment. The three normal stresses were measured by neutron diffraction for three types of sample: coil, unwelded rings cut from the pipe made from this coil, and girth welded rings cut from linepipe. All three specimens came from three thicknesses of manufacture (5.4, 6.4, and 7.1 mm). The welds are manual metal arc cellulosic electrode welds made in X70 linepipe, these were measured at 5 through-thickness positions at 19 locations (from the center of the weld up to 35 mm away from the weld) with a spatial resolution of 1 mm 3 . The coil and unwelded rings were measured at the same five through-thickness positions

  20. Microseismic response characteristics modeling and locating of underground water supply pipe leak

    Science.gov (United States)

    Wang, J.; Liu, J.

    2015-12-01

    In traditional methods of pipeline leak location, geophones must be located on the pipe wall. If the exact location of the pipeline is unknown, the leaks cannot be identified accurately. To solve this problem, taking into account the characteristics of the pipeline leak, we propose a continuous random seismic source model and construct geological models to investigate the proposed method for locating underground pipeline leaks. Based on two dimensional (2D) viscoacoustic equations and the staggered grid finite-difference (FD) algorithm, the microseismic wave field generated by a leaking pipe is modeled. Cross-correlation analysis and the simulated annealing (SA) algorithm were utilized to obtain the time difference and the leak location. We also analyze and discuss the effect of the number of recorded traces, the survey layout, and the offset and interval of the traces on the accuracy of the estimated location. The preliminary results of the simulation and data field experiment indicate that (1) a continuous random source can realistically represent the leak microseismic wave field in a simulation using 2D visco-acoustic equations and a staggered grid FD algorithm. (2) The cross-correlation method is effective for calculating the time difference of the direct wave relative to the reference trace. However, outside the refraction blind zone, the accuracy of the time difference is reduced by the effects of the refracted wave. (3) The acquisition method of time difference based on the microseismic theory and SA algorithm has a great potential for locating leaks from underground pipelines from an array located on the ground surface. Keywords: Viscoacoustic finite-difference simulation; continuous random source; simulated annealing algorithm; pipeline leak location

  1. Development and design of a UF6 gas pressure meter for 42 mm pipes

    International Nuclear Information System (INIS)

    Peters, E.; Wichers, V.A.

    1995-08-01

    X-ray fluorescence (XRF) has proved to be a feasible method of measuring the pressure of UF 6 -gas for enrichment verification purposes. Complications will arise under extreme conditions, such as high uranium deposit to gas ratios, pipe diameters smaller than 40 mm and pressures less than 100 Pa. This report presents an experimental analysis of the XRF method for design worst case conditions for 42 outer diameter cascade-to-header pipes and the development of a prototype measurement device. This prototype is integrated in the construction of the enrichment verification system. (orig.)

  2. Effectiveness of the Vertical Gas Ventilation Pipes for Promoting Waste Stabilization in Post-Closure Phase

    Directory of Open Access Journals (Sweden)

    Yasumasa Tojo

    2015-06-01

    Full Text Available To make inside of the municipal solid waste (MSW landfill aerobic as much as possible is thought to be preferable for promoting waste stabilization, reducing pollutant's load in leachate, minimizing greenhouse gas emission and shortening post-closure-care period. In Japan, installation of semi-aerobic landfill structure has widely spread in order to promote waste stabilization in MSW landfill from 1980s. In semi-aerobic landfill structure, outlet of main leachate collection pipe is opened to atmosphere. Heat generated by aerobic degradation of waste causes natural convection and natural aeration arises from the outlet of leachate collection pipe to the gas vents. It is so-called stack effect. This air flow is thought to be effective for purifying leachate flowing through drainage layer and leachate collection pipes. And it is also thought to be contributing to expanding aerobic region in waste layer in landfill. Recently, measures attempting the promotion of waste stabilization are taken at several landfills at where stabilization of waste delays, in which many vertical gas vents are newly installed and close structure to semi-aerobic landfill is created. However, in many cases, these gas vents are not connected to leachate collection pipes. Many vertical gas vents are just installed without scientific proof regarding whether they can contribute for waste stabilization. In this study, how such installation of gas vents is effective for waste stabilization and aerobization of waste layer was discussed by numerical analysis. In numerical analysis, heat transfer, gas movement by pressure, gas diffusion, biological degradation of organic matter, and heat generation by biodegradation were taken into account. Simulations were carried out by using the general purpose simulator of finite element method. Three types of landfill structure were assumed. As the results, the following information were obtained. In dig-down type landfill, installation of gas

  3. Evolution of the structure of a gas-liquid two-phase flow in a large vertical pipe

    International Nuclear Information System (INIS)

    Horst-Michael Prasser; Matthias Beyer; Helmar Carl; Sabine Gregor; Dirk Lucas; Peter Schuetz; Frank-Peter Weiss

    2005-01-01

    Full text of publication follows: Experimental results on the evolution of the radial gas fraction profiles, gas velocity profiles and bubble size distributions in a gas-liquid two-phase flow along a large vertical pipe of 194 mm inner diameter are presented. The tests were performed at the TOPFLOW facility in Rossendorf, where two wire-mesh sensors were used to measure sequences of two-dimensional distributions of local instantaneous gas fraction within the complete pipe cross-section with a lateral resolution of 3 mm and a sampling frequency of 2500 Hz. This data is the basis for a fast flow visualization and for the calculation of the mentioned profiles. The gas fraction profiles were obtained by averaging the sequences over time, velocities were measured by cross-correlation of the signals of the two sensors, which were located on a short (63 mm) distance behind each other. The high resolution of the mesh sensors allows to identify regions of connected measuring points in the data array, which are filled with the gas phase. This method was used to obtain the bubble size distributions. In the experiments, the superficial velocities ranged from 0.04 to 8 m/s for the gas phase and from 0.04 to 1.6 m/s for the liquid. In this way, the experiments cover the range from bubbly to churn turbulent flow regimes. The evolution of the flow structure was studied by varying the distance between the gas injection and the sensor position. This distance was changed by the help of a so-called variable gas injection set-up. It consists of 6 gas injection units, each of them equipped with three rings of orifices in the pipe wall for the gas injection. These rings are fed with the gas phase from ring chambers, which can be individually controlled by valves. The middle ring has orifices of 4 mm diameter, while the upper and the lower rings have nozzles of 1 mm diameter. In this way, 18 different inlet lengths and two different gas injection geometries can be chosen. The latter

  4. Unknown plant de-construction hazard -- Toxic COS and CS2 gas from torch cutting of pipe

    International Nuclear Information System (INIS)

    Martin, H.L.; Nutt, A.W.; Myers, B.L.; Hightower, J.O.

    1994-01-01

    An employee exhibited signs of illness after apparently inhaling fumes generated from a pipe that had been cut with a cutting torch. Identification and quantification of the hazardous air emission for reduction of risk via the Department of Energy Class B Investigation are described in this case study. The old hydrogen sulfide gas flare pipe in the heavy water plant of the Savannah River Site has been abandoned with one end open to atmosphere for almost twenty years. The pipe was being removed and cut into sections for disposal during an asbestos abatement project. It contained ash like corrosion deposits that smolder after torch cutting. Investigation revealed that burning of carbon and sulfur in the oxygen deficient atmosphere in the ash generated carbonyl sulfide (COS) and carbon disulfide (CS 2 ) gas, which vented when the pipe was moved by the injured construction rigger. This is believed to be the first well documented exposure and response of a human to high concentration COS gas. Sulfur dioxide (SO 2 ) gas is also generated during the cutting. SO 2 is almost impossible to inhale and has apparently prevented a similar injury during the cutting. SO 2 is almost impossible to inhale and has apparently prevented a similar injury during the many years of US and Canadian heavy water plant de-construction experience. Immediate water quench of the smoldering ash after each cut has eliminated the hazard of residual COS and CS 2 gas. This previously unrecognized industrial hazard may be encountered by other chemical and petroleum industries during torch cutting of pipes that contain similar deposits of iron oxide, iron sulfate, sulfur and carbon

  5. Study on heat pipe assisted thermoelectric power generation system from exhaust gas

    Science.gov (United States)

    Chi, Ri-Guang; Park, Jong-Chan; Rhi, Seok-Ho; Lee, Kye-Bock

    2017-11-01

    Currently, most fuel consumed by vehicles is released to the environment as thermal energy through the exhaust pipe. Environmentally friendly vehicle technology needs new methods to increase the recycling efficiency of waste exhaust thermal energy. The present study investigated how to improve the maximum power output of a TEG (Thermoelectric generator) system assisted with a heat pipe. Conventionally, the driving energy efficiency of an internal combustion engine is approximately less than 35%. TEG with Seebeck elements is a new idea for recycling waste exhaust heat energy. The TEG system can efficiently utilize low temperature waste heat, such as industrial waste heat and solar energy. In addition, the heat pipe can transfer heat from the automobile's exhaust gas to a TEG. To improve the efficiency of the thermal power generation system with a heat pipe, effects of various parameters, such as inclination angle, charged amount of the heat pipe, condenser temperature, and size of the TEM (thermoelectric element), were investigated. Experimental studies, CFD simulation, and the theoretical approach to thermoelectric modules were carried out, and the TEG system with heat pipe (15-20% charged, 20°-30° inclined configuration) showed the best performance.

  6. Experiments on vertical gas-liquid pipe flows using ultrafast X-ray tomography

    Energy Technology Data Exchange (ETDEWEB)

    Banowski, M.; Beyer, M.; Lucas, D.; Hoppe, D.; Barthel, F. [Helmholtz-Zentrum Dresden-Rossendorf (Germany). Inst. fuer Sicherheitsforschung

    2016-12-15

    For the qualification and validation of two-phase CFD-models for medium and large-scale industrial applications dedicated experiments providing data with high temporal and spatial resolution are required. Fluid dynamic parameter like gas volume fraction, bubble size distribution, velocity or turbulent kinetic energy should be measured locally. Considering the fact, that the used measurement techniques should not affect the flow characteristics, radiation based tomographic methods are the favourite candidate for such measurements. Here the recently developed ultrafast X-ray tomography, is applied to measure the local and temporal gas volume fraction distribution in a vertical pipe. To obtain the required frame rate a rotating X-ray source by a massless electron beam and a static detector ring are used. Experiments on a vertical pipe are well suited for development and validation of closure models for two-phase flows. While vertical pipe flows are axially symmetrically, the boundary conditions are well defined. The evolution of the flow along the pipe can be investigated as well. This report documents the experiments done for co-current upwards and downwards air-water and steam-water flows as well as for counter-current air-water flows. The details of the setup, measuring technique and data evaluation are given. The report also includes a discussion on selected results obtained and on uncertainties.

  7. Influence of Gas-Liquid Interface on Temperature Wave of Pulsating Heat Pipe

    Directory of Open Access Journals (Sweden)

    Ying Zhang

    2018-01-01

    Full Text Available The influence of the interface on the amplitude and phase of the temperature wave and the relationship between the attenuation of the temperature wave and the gas-liquid two-phase physical parameters are studied during the operation of the pulsating heat pipe. The numerical simulation shows that the existence of the phase interface changes the direction of the temperature gradient during the propagation of the temperature wave, which increases the additional “thermal resistance.” The relative size of the gas-liquid two-phase thermal conductivity affects the propagation direction of heat flow at phase interface directly. The blockage of the gas plug causes hysteresis in the phase of the temperature wave, the relative size of the gas-liquid two-phase temperature coefficient will gradually increase the phase of the temperature wave, and the time when the heat flow reaches the peak value is also advanced. The attenuation of the temperature wave is almost irrelevant to the absolute value of the density, heat capacity, and thermal conductivity of the gas-liquid two phases, and the ratio of the thermal conductivity of the gas-liquid two phases is related. When the temperature of the heat pipe was changed, the difference of heat storage ability between gas and liquid will lead to the phenomenon of heat reflux and becomes more pronounced with the increases of the temperature wave.

  8. One-Way Flow of a Rarefied Gas Induced in a Circular Pipe with a Periodic Temperature Distribution

    National Research Council Canada - National Science Library

    Aoki, K

    2000-01-01

    The steady behavior of a rarefied gas in a circular pipe with a saw-like temperature distribution increasing and decreasing periodically in the direction of the pipe axis is investigated numerically...

  9. Void fraction development in gas-liquid flow after a U-bend in a vertically upwards serpentine-configuration large-diameter pipe

    Science.gov (United States)

    Almabrok, Almabrok A.; Aliyu, Aliyu M.; Baba, Yahaya D.; Lao, Liyun; Yeung, Hoi

    2018-01-01

    We investigate the effect of a return U-bend on flow behaviour in the vertical upward section of a large-diameter pipe. A wire mesh sensor was employed to study the void fraction distributions at axial distances of 5, 28 and 47 pipe diameters after the upstream bottom bend. The study found that, the bottom bend has considerable impacts on up-flow behaviour. In all conditions, centrifugal action causes appreciable misdistribution in the adjacent straight section. Plots from WMS measurements show that flow asymmetry significantly reduces along the axis at L/D = 47. Regime maps generated from three axial locations showed that, in addition to bubbly, intermittent and annular flows, oscillatory flow occurred particularly when gas and liquid flow rates were relatively low. At this position, mean void fractions were in agreement with those from other large-pipe studies, and comparisons were made with existing void fraction correlations. Among the correlations surveyed, drift flux-type correlations were found to give the best predictive results.

  10. Static Behaviour of Natural Gas and its Flow in Pipes

    OpenAIRE

    Ohirhian, Peter

    2010-01-01

    1. 2. A general differential equation that governs static behavior of any fluid and its flow in horizontal, uphill and downhill pipes has been developed. classical fourth order Runge-Kutta numerical method is programmed in Fortran 77, to test the equation and results are accurate. The program shows that a length ncrement as large as 10,000 ft can be used in the Runge-Kutta method of solution to differential equation during uphill gas flow and up to 5700ft for downhill gas flow The Runge-Kutta...

  11. Forming of film surface of very viscous liquid flowing with gas in pipes

    Directory of Open Access Journals (Sweden)

    Czernek Krystian

    2017-01-01

    Full Text Available The study presents the possible use of optoelectronic system for the measurement of the values, which are specific for hydrodynamics of two-phase gas liquid flow in vertical pipes, where a very-high-viscosity liquid forms a falling film in a pipe. The experimental method was provided, and the findings were presented and analysed for selected values, which characterize the two-phase flow. Attempt was also made to evaluate the effects of flow parameters and properties of the liquid on the gas-liquid interface value, which is decisive for the conditions of heat exchange and mass transfer in falling film equipment. The nature and form of created waves at various velocities were also described.

  12. Development and design of a UF{sub 6} gas pressure meter for 42 mm pipes

    Energy Technology Data Exchange (ETDEWEB)

    Peters, E.; Wichers, V.A.

    1995-08-01

    X-ray fluorescence (XRF) has proved to be a feasible method of measuring the pressure of UF{sub 6}-gas for enrichment verification purposes. Complications will arise under extreme conditions, such as high uranium deposit to gas ratios, pipe diameters smaller than 40 mm and pressures less than 100 Pa. This report presents an experimental analysis of the XRF method for design worst case conditions for 42 outer diameter cascade-to-header pipes and the development of a prototype measurement device. This prototype is integrated in the construction of the enrichment verification system. (orig.).

  13. Reliable pipeline repair system for very large pipe size

    Energy Technology Data Exchange (ETDEWEB)

    Charalambides, John N.; Sousa, Alexandre Barreto de [Oceaneering International, Inc., Houston, TX (United States)

    2004-07-01

    The oil and gas industry worldwide has been mainly depending on the long-term reliability of rigid pipelines to ensure the transportation of hydrocarbons, crude oil, gas, fuel, etc. Many other methods are also utilized onshore and offshore (e.g. flexible lines, FPSO's, etc.), but when it comes to the underwater transportation of very high volumes of oil and gas, the industry commonly uses large size rigid pipelines (i.e. steel pipes). Oil and gas operators learned to depend on the long-lasting integrity of these very large pipelines and many times they forget or disregard that even steel pipelines degrade over time and more often that that, they are also susceptible to various forms of damage (minor or major, environmental or external, etc.). Over the recent years the industry had recognized the need of implementing an 'emergency repair plan' to account for such unforeseen events and the oil and gas operators have become 'smarter' by being 'pro-active' in order to ensure 'flow assurance'. When we consider very large diameter steel pipelines such as 42' and 48' nominal pipe size (NPS), the industry worldwide does not provide 'ready-made', 'off-the-shelf' repair hardware that can be easily shipped to the offshore location and effect a major repair within acceptable time frames and avoid substantial profit losses due to 'down-time' in production. The typical time required to establish a solid repair system for large pipe diameters could be as long as six or more months (depending on the availability of raw materials). This paper will present in detail the Emergency Pipeline Repair Systems (EPRS) that Oceaneering successfully designed, manufactured, tested and provided to two major oil and gas operators, located in two different continents (Gulf of Mexico, U.S.A. and Arabian Gulf, U.A.E.), for two different very large pipe sizes (42'' and 48'' Nominal Pipe Sizes

  14. Heat Pipe-Assisted Thermoelectric Power Generation Technology for Waste Heat Recovery

    Science.gov (United States)

    Jang, Ju-Chan; Chi, Ri-Guang; Rhi, Seok-Ho; Lee, Kye-Bock; Hwang, Hyun-Chang; Lee, Ji-Su; Lee, Wook-Hyun

    2015-06-01

    Currently, large amounts of thermal energy dissipated from automobiles are emitted through hot exhaust pipes. This has resulted in the need for a new efficient recycling method to recover energy from waste hot exhaust gas. The present experimental study investigated how to improve the power output of a thermoelectric generator (TEG) system assisted by a wickless loop heat pipe (loop thermosyphon) under the limited space of the exhaust gas pipeline. The present study shows a novel loop-type heat pipe-assisted TEG concept to be applied to hybrid vehicles. The operating temperature of a TEG's hot side surface should be as high as possible to maximize the Seebeck effect. The present study shows a novel TEG concept of transferring heat from the source to the sink. This technology can transfer waste heat to any local place with a loop-type heat pipe. The present TEG system with a heat pipe can transfer heat and generate an electromotive force power of around 1.3 V in the case of 170°C hot exhaust gas. Two thermoelectric modules (TEMs) for a conductive block model and four Bi2Te3 TEMs with a heat pipe-assisted model were installed in the condenser section. Heat flows to the condenser section from the evaporator section connected to the exhaust pipe. This novel TEG system with a heat pipe can be placed in any location on an automobile.

  15. Development of acoustic flow instruments for solid/gas pipe flows

    International Nuclear Information System (INIS)

    Sheen, S.H.; Raptis, A.C.

    1986-05-01

    Two nonintrusive acoustic flow sensing techniques are reported. One technique, passive in nature, simply measures the bandpassed acoustic noise level produced by particle/particle and particle/wall collisions. The noise levels, given in true RMS voltages or in autocorrelations, show a linear relationship to particle velocity but increase with solid concentration. Therefore, the passive technique requires calibration and a separate measure of solid concentration before it can be used to monitor the particle velocity. The second technique is based on the active cross-correlation principle. It measures particle velocity directly by correlating flow-related signatures at two sensing stations. The velocity data obtained by this technique are compared with measurements by a radioactive-particle time-of-flight (TOF) method. A multiplier of 1.53 is required to bring the acoustic data into agreement with the radioactive TOF result. The difference may originate from the difference in flow fields where particles are detected. The radioactive method senses particles mainly in the turbulent region and essentially measures average particle velocity across the pipe, while the acoustic technique detects particles near the pipe wall, and so measures the particle velocity in the viscous sublayer. Both techniques were tested in flows of limestone and air and 1-mm glass beads and air at the Argonne National Laboratory Solid/Gas Test Facility (SGFTF). The test matrix covered solid velocities of 20 to 30 m/s in a 2-in. pipe and solid-to-gas loading ratios of 6 to 22. 37 refs., 19 figs., 4 tabs

  16. Economic feasibility of pipe storage and underground reservoir storage options for power-to-gas load balancing

    International Nuclear Information System (INIS)

    Budny, Christoph; Madlener, Reinhard; Hilgers, Christoph

    2015-01-01

    Highlights: • Study of cost effectiveness of power-to-gas and storage of H 2 and renewable methane. • NPV analysis and Monte Carlo simulation to address fuel and electricity price risks. • Gas sale is compared with power and gas market arbitrage and balancing market gains. • Power-to-gas for linking the balancing markets for power and gas is not profitable. • Pipe storage is the preferred option for temporal arbitrage and balancing energy. - Abstract: This paper investigates the economic feasibility of power-to-gas (P2G) systems and gas storage options for both hydrogen and renewable methane. The study is based on a techno-economic model in which the net present value (NPV) method and Monte Carlo simulation of risks and price forward curves for the electricity and the gas market are used. We study three investment cases: a Base Case where the gas is directly sold in the market, a Storage & Arbitrage Case where temporal arbitrage opportunities between the electricity and the gas market are exploited, and a Storage & Balancing Case where the balancing markets (secondary reserve market for electricity, external balancing market for natural gas) are addressed. The optimal type and size of different centralized and decentralized storage facilities are determined and compared with each other. In a detailed sensitivity and cost analysis, we identify the key factors which could potentially improve the economic viability of the technological concepts assessed. We find that the P2G system used for bridging the balancing markets for power and gas cannot be operated profitably. For both, temporal arbitrage and balancing energy, pipe storage is preferred. Relatively high feed-in tariffs (100 € MW −1 for hydrogen, 130 € MW −1 for methane) are required to render pipe storage for P2G economically viable

  17. Oil in the FFTF secondary loop cover gas piping. Final unusual occurrence report

    International Nuclear Information System (INIS)

    Kuechle, J.D.

    1981-01-01

    The final unusual occurrence report describes the discovery of oil in the FFTF secondary sodium system cover gas piping. A thorough evaluation has been performed and corrective actions have been implemented to prevent a recurrence of this event

  18. Comparison of Two Potassium-Filled Gas-Controlled Heat Pipes

    Science.gov (United States)

    Bertiglia, F.; Iacomini, L.; Moro, F.; Merlone, A.

    2015-12-01

    Calibration by comparison of platinum resistance thermometers and thermocouples requires transfer media capable of providing very good short-term temperature uniformity and temperature stability over a wide temperature range. This paper describes and compares the performance of two potassium-filled gas-controlled heat pipes (GCHP) for operation over the range from 420° C to 900° C. One of the heat pipes has been in operation for more than 10 years having been operated at temperature for thousands of hours, while the other was commissioned in 2010 following recently developed improvements to both the design, assembly, and filling processes. It was found that the two devices, despite differences in age, structure, number of wells, and filling processes, realized the same temperatures within the measurement uncertainty. The results show that the potassium-filled GCHP provides a durable and high-quality transfer medium for performing thermometer calibrations with very low uncertainties, over the difficult high-temperature range from 420° C to 900° C.

  19. Experimental determination of the thickness of aluminum cascade pipes in the presence of UF{sub 6} gas during enrichment measurements

    Energy Technology Data Exchange (ETDEWEB)

    Lombardi, M.L., E-mail: lombardi@lanl.gov [Los Alamos National Laboratory, P.O. Box 1663, Los Alamos NM 87545 (United States); Favalli, A.; Goda, J.M.; Ianakiev, K.D.; MacArthur, D.W.; Moss, C.E. [Los Alamos National Laboratory, P.O. Box 1663, Los Alamos NM 87545 (United States)

    2012-04-21

    We present a method of determining the wall thickness of a pipe in a Gas Centrifuge Enrichment Plant (GCEP) when an empty pipe measurement is not feasible. Our method uses an X-ray tube for transmission measurements and a lanthanum bromide (LaBr{sub 3}) scintillation detector on the opposite side of the pipe. Two filters, molybdenum (K-edge 20.0 keV) and palladium (K-edge 24.35 keV) are used to transform the bremsstrahlung spectra produced by the X-ray tube into more useful, sharply peaked, spectra. The maximum energies of the peaks are determined by the K-edges of the filters. The attenuation properties of the uranium hexafluoride (UF{sub 6}) gas allow us to determine wall thickness by looking at the ratio of selected regions of interest (ROIs) of the Mo and Pd transmitted spectra. While the attenuation factor at these two transmission energies in the UF{sub 6} gas is nearly equal, attenuation in the aluminum pipe wall at these two energies differs by a factor of about 60. This difference allows measurement of attenuation in the pipe independent of attenuation in the UF{sub 6} gas. Feasibility studies were performed using analytical calculations, and filter thicknesses were optimized. In order to experimentally validate our attenuation measurement method, a UF{sub 6} source with variable enrichment and pipe thickness was built. We describe the experimental procedure used to verify our previous calculations and present recent results.

  20. Study on pressure pulsation and piping vibration of complex piping of reciprocating compressor

    International Nuclear Information System (INIS)

    Xu Bin; Feng Quanke; Yu Xiaoling

    2008-01-01

    This paper presents a preliminary research on the piping vibration and pressure pulsation of reciprocating compressor piping system. On the basis of plane wave theory, the calculation of gas column natural frequency and pressure pulsation in complex pipelines is done by using the transfer matrix method and stiffness matrix method, respectively. With the discretization method of FEM, a mathematical model for calculating the piping vibration and stress of reciprocating compressor piping system is established, and proper boundary conditions are proposed. Then the structural modal and stress of the piping system are calculated with CAESAR II. The comparison of measured and calculated values found that the one dimensional wave equation can accurately calculate the natural frequency and pressure pulsation in gas column of piping system for reciprocating compressor. (authors)

  1. Inspection of Pipe Inner Surface using Advanced Pipe Crawler Robot with PVDF Sensor based Rotating Probe

    Directory of Open Access Journals (Sweden)

    Vimal AGARWAL

    2011-04-01

    Full Text Available Due to corrosive environment, pipes used for transportation of water and gas at the plants often get damaged. Defects caused by corrosion and cracking may cause serious accidents like leakage, fire and blasts. It also reduces the life of the transportation system substantially. In order to inspect such defects, a Polyvinyledene Fluoride (PVDF based cantilever smart probe is developed to scan the surface quality of the pipes. The smart probe, during rotation, touches the inner surface of the pipe and experience a broad-band excitation in the absence of surface features. On the other hand, whenever the probe comes across any surface projection, there is a change in vibration pattern of the probe, which causes a high voltage peak/pulse. Such peaks/pulses could give useful information about the location and nature of a defect. Experiments are carried out on different patterns, sizes and shapes of surface projections artificially constructed inside the pipe. The sensor system has reliably predicted the presence and distribution of projections in every case. It is envisaged that the new sensing system could be used effectively for pipe health monitoring.

  2. 46 CFR 153.280 - Piping system design.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Piping system design. 153.280 Section 153.280 Shipping... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Piping Systems and Cargo Handling Equipment § 153.280 Piping system design. (a) Each cargo piping system must meet...

  3. Experiments about the integrity of BWR relief pipes in postulated radiolysis gas combustion. Scenario No.2. Minor steam leakages without any lowering of the water level

    International Nuclear Information System (INIS)

    Friedrich, A.; Grune, J.; Sempert, K.; Stern, G.; Kuznetsov, M.; Redlinger, R.; Breitung, W.; Franke, T.

    2008-01-01

    The experiments described in this article were performed to study this comprehensive radiolysis gas scenario: - The relief pipe is filled completely with radiolysis gas (2H 2 +O 2 ). - After opening of the S and R valve, the radiolysis gas is compressed adiabatically by the incoming steam without mixing. - Roughly at the point of peak pressure in the relief pipe (20 bar) the radiolysis gas ignites. This dynamic scenario was studied in steady-state model experiments with a test pipe which corresponds to the relief pipes installed in KKP-1 in terms of materials, dimensions, and manufacturing control. The initial conditions and boundary conditions of the experiments were conservative. In the course of the tests, the maximum dynamic strain and the residual plastic deformation of the test pipe were measured via the transient detonation load. The maximum dynamic strain measured was 0.75%, the maximum residual plastic strain reached 0.15%. The pipe suffered no other deformation above and beyond this slight plastic strain. The radiolysis gas detonation was simulated very well numerically. Using the calculated pressure loads in a structural dynamics model also showed good agreement with the measured maximum dynamic pipe strains. In this way, the experimental findings were confirmed theoretically. The experiments and the calculations showed that postulated radiolysis gas reactions during pressure relief cannot jeopardize the integrity of the relief pipe. (orig.)

  4. High-energy air shock study in steel and grout pipes

    International Nuclear Information System (INIS)

    Glenn, H.D.; Kratz, H.R.; Keough, D.D.; Duganne, D.A.; Ruffner, D.J.; Swift, R.P.; Baum, D.

    1979-01-01

    Voitenko compressors are used to generate 43 mm/μs air shocks in both a steel and a grout outlet pipe containing ambient atmospheric air. Fiber-optic ports provide diaphragm burst times, time-of-arrival (TOA) data, and velocities for the shock front along the 20-mm-ID exit pipes. Pressure profiles are obtained at higher enthalpy shock propagation than ever before and at many locations along the exit pipes. Numerous other electronic sensors and postshot observations are described, as well as experimental results. The primary objectives of the experiments are as follows: (1) provide a data base for normalization/improvement of existing finite-difference codes that describe high-energy air shocks and gas propagation; (2) obtain quantitative results on the relative attenuation effects of two very different wall materials for high-energy air shocks and gas flows. The extensive experimental results satisfy both objectives

  5. Characterization of linear interfacial waves in a turbulent gas-liquid pipe flow

    Science.gov (United States)

    Ayati, A. A.; Farias, P. S. C.; Azevedo, L. F. A.; de Paula, I. B.

    2017-06-01

    The evolution of interfacial waves on a stratified flow was investigated experimentally for air-water flow in a horizontal pipe. Waves were introduced in the liquid level of stratified flow near the pipe entrance using an oscillating plate. The mean height of liquid layer and the fluctuations superimposed on this mean level were captured using high speed cameras. Digital image processing techniques were used to detect instantaneous interfaces along the pipe. The driving signal of the oscillating plate was controlled by a D/A board that was synchronized with acquisitions. This enabled to perform phase-locked acquisitions and to use ensemble average procedures. Thereby, it was possible to measure the temporal and spatial evolution of the disturbances introduced in the flow. In addition, phase-locked measurements of the velocity field in the liquid layer were performed using standard planar Particle Image Velocimetry (PIV). The velocity fields were extracted at a fixed streamwise location, whereas the measurements of the liquid level were performed at several locations along the pipe. The assessment of the setup was important for validation of the methodology proposed in this work, since it aimed at providing results for further comparisons with theoretical models and numerical simulations. Therefore, the work focuses on validation and characterization of interfacial waves within the linear regime. Results show that under controlled conditions, the wave development can be well captured and reproduced. In addition, linear waves were observed for liquid level oscillations lower than about 1.5% of the pipe diameter. It was not possible to accurately define an amplitude threshold for the appearance of nonlinear effects because it strongly depended on the wave frequency. According to the experimental findings, longer waves display characteristics similar to linear waves, while short ones exhibit a more complex evolution, even for low amplitudes.

  6. Thermodynamic modeling and evaluation of high efficiency heat pipe integrated biomass Gasifier–Solid Oxide Fuel Cells–Gas Turbine systems

    International Nuclear Information System (INIS)

    Santhanam, S.; Schilt, C.; Turker, B.; Woudstra, T.; Aravind, P.V.

    2016-01-01

    This study deals with the thermodynamic modeling of biomass Gasifier–SOFC (Solid Oxide Fuel Cell)–GT (Gas Turbine) systems on a small scale (100 kW_e). Evaluation of an existing biomass Gasifier–SOFC–GT system shows highest exergy losses in the gasifier, gas turbine and as waste heat. In order to reduce the exergy losses and increase the system's efficiency, improvements are suggested and the effects are analyzed. Changing the gasifying agent for air to anode gas gave the largest increase in the electrical efficiency. However, heat is required for an allothermal gasification to take place. A new and simple strategy for heat pipe integration is proposed, with heat pipes placed in between stacks in series, rather than the widely considered approach of integrating the heat pipes within the SOFC stacks. The developed system based on a Gasifier–SOFC–GT combination improved with heat pipes and anode gas recirculation, increases the electrical efficiency from approximately 55%–72%, mainly due to reduced exergy losses in the gasifier. Analysis of the improved system shows that operating the system at possibly higher operating pressures, yield higher efficiencies within the range of the operating pressures studied. Further the system was scaled up with an additional bottoming cycle achieved electrical efficiency of 73.61%. - Highlights: • A new and simple strategy for heat pipe integration between SOFC and Gasifier is proposed. • Anode exhaust gas is used as a gasifying agent. • The new proposed Gasifier–SOFC–GT system achieves electrical efficiency of 72%. • Addition of steam rankine bottoming cycle to proposed system increases electrical efficiency to 73.61%.

  7. Experiments in stratified gas-liquid pipe flow

    NARCIS (Netherlands)

    Birvalski, M.

    2015-01-01

    The growing demand for energy in the future will necessitate the production of natural gas from fields which are located farther offshore, in deep water and in very cold environments. This will confront us with difficulties in ensuring continuous production of the fluids (natural gas, condensate and

  8. Design guideline to prevent the pipe rupture by radiolysis gases in BWR steam piping

    International Nuclear Information System (INIS)

    Inagaki, T.; Miyagawa, M.; Ota, T.; Sato, T.; Sakata, K.

    2009-01-01

    In late 2001, pipe rupture accidents due to fast combustion of radiolysis gas occurred in Japan and elsewhere's BWR power plants. TENPES began to set up the guideline as action to such a new problem to prevent accumulation and combustion of radiolysis gas in BWR steam piping. And then, the first edition of guideline was published in October 2005. Afterwards, the experimental study about combustion/detonation of radiolysis gas have been continued. And in March 2007, TENPES published a revised edition of the guideline. This is the report of the revised edition of that guideline. According to this guideline, it became possible to design BWR's steam piping to prevent accumulation of radiolysis gas. (author)

  9. Prediction of gas volume fraction in fully-developed gas-liquid flow in a vertical pipe

    International Nuclear Information System (INIS)

    Islam, A.S.M.A.; Adoo, N.A.; Bergstrom, D.J.; Wang, D.F.

    2015-01-01

    An Eulerian-Eulerian two-fluid model has been implemented for the prediction of the gas volume fraction profile in turbulent upward gas-liquid flow in a vertical pipe. The two-fluid transport equations are discretized using the finite volume method and a low Reynolds number κ-ε turbulence model is used to predict the turbulence field for the liquid phase. The contribution to the effective turbulence by the gas phase is modeled by a bubble induced turbulent viscosity. For the fully-developed flow being considered, the gas volume fraction profile is calculated using the radial momentum balance for the bubble phase. The model potentially includes the effect of bubble size on the interphase forces and turbulence model. The results obtained are in good agreement with experimental data from the literature. The one-dimensional formulation being developed allows for the efficient assessment and further development of both turbulence and two-fluid models for multiphase flow applications in the nuclear industry. (author)

  10. Prediction of gas volume fraction in fully-developed gas-liquid flow in a vertical pipe

    Energy Technology Data Exchange (ETDEWEB)

    Islam, A.S.M.A.; Adoo, N.A.; Bergstrom, D.J., E-mail: nana.adoo@usask.ca [University of Saskatchewan, Department of Mechanical Engineering, Saskatoon, SK (Canada); Wang, D.F. [Canadian Nuclear Laboratories, Chalk River, ON (Canada)

    2015-07-01

    An Eulerian-Eulerian two-fluid model has been implemented for the prediction of the gas volume fraction profile in turbulent upward gas-liquid flow in a vertical pipe. The two-fluid transport equations are discretized using the finite volume method and a low Reynolds number κ-ε turbulence model is used to predict the turbulence field for the liquid phase. The contribution to the effective turbulence by the gas phase is modeled by a bubble induced turbulent viscosity. For the fully-developed flow being considered, the gas volume fraction profile is calculated using the radial momentum balance for the bubble phase. The model potentially includes the effect of bubble size on the interphase forces and turbulence model. The results obtained are in good agreement with experimental data from the literature. The one-dimensional formulation being developed allows for the efficient assessment and further development of both turbulence and two-fluid models for multiphase flow applications in the nuclear industry. (author)

  11. Optical turbulence in a spinning pipe gas lens

    CSIR Research Space (South Africa)

    Mafusire, C

    2009-07-01

    Full Text Available in the Spinning Pipe Gas Lens by optical means • Axial Propagation • Boundary Layer Phase Structure Function and Slope Correlation • Slope Correlation ( ) ( ) ( )[ ]2rrxrD φφφ −+= ( ) ( ) ( )rsrxsrCs += Inner Scale Outer Scale • Phase Structure Function... -----------------------Mean 4 3 2 1 DΦ(r2) or SC(r2) DΦ(r1) or SC(r1) Phase Structure Function ( ) oon Lrl,LC.logrlogrDlog ≤≤⎟⎟⎠ ⎞ ⎜⎜⎝ ⎛ ⎟⎠ ⎞⎜⎝ ⎛+= 2 22912 3 5 λ π φ Homogeneity Isotropy Boundary LayerAxisPropagation Path 1. Axial propagation fulfils...

  12. Gas lensing in a heated spinning pipe

    CSIR Research Space (South Africa)

    Mafusire, C

    2006-07-01

    Full Text Available ; and (II) the aberrations introduced to the laser are a function of the distance from the edge of the pipe, as well as the speed of the pipe spin- ning. This is because of the turbulence near the pipe wall. The speed of the pipe will be used...- merically. This work forms the basis for an extended study of the dynamics of beam propa- gation through turbulent systems, and in particular, the following aspects will be explored in future work: (I) Using the recent advances in lasers beam propagation...

  13. A dynamic model of gas flow in a non-uniform pipe

    International Nuclear Information System (INIS)

    Mensah, S.; Lepp, R.M.

    1979-08-01

    A gas-line model, based on the analysis of compressible flow with friction, has been developed to describe the dynamics of gas flow in a non-uniform line, i.e. one comprising segments of different lengths and diameters. Acoustic wave analysis was used in a novel way, by considering the line as a cascaded connection of uniform pipes separated by discontinuities. The transmission matrix representing this non-uniform line is the product of the matrices for each element in the system. To facilitate implementation of the theoretical model on a hybrid computer, modal approximatons to its transfer functions were derived. Both models were validated against experimental data. (author)

  14. Hydrogen isotope effect through Pd in hydrogen transport pipe

    International Nuclear Information System (INIS)

    Tamaki, Masayoshi

    1992-01-01

    This investigation concerns hydrogen system with hydrogen transport pipes for transportation, purification, isotope separation and storage of hydrogen and its isotopes. A principle of the hydrogen transport pipe (heat pipe having hydrogen transport function) was proposed. It is comprised of the heat pipe and palladium alloy tubes as inlet, outlet, and the separation membrane of hydrogen. The operation was as follows: (1) gas was introduced into the heat pipe through the membrane in the evaporator; (2) the introduced gas was transported toward the condenser by the vapor flow; (3) the transported gas was swept and compressed to the end of the condenser by the vapor pressure; and (4) the compressed gas was exhausted from the heat pipe through the membrane in the condenser. The characteristics of the hydrogen transport pipe were examined for various working conditions. Basic performance concerning transportation, evacuation and compression was experimentally verified. Isotopic dihydrogen gases (H 2 and D 2 ) were used as feed gas for examining the intrinsic performance of the isotope separation by the hydrogen transport pipe. A simulated experiment for hydrogen isotope separation was carried out using a hydrogen-helium gas mixture. The hydrogen transport pipe has a potential for isotope separation and purification of hydrogen, deuterium and tritium in fusion reactor technology. (author)

  15. Feasibility of Locating Leakages in Sewage Pressure Pipes Using the Distributed Temperature Sensing Technology

    OpenAIRE

    Apperl, Benjamin; Pressl, Alexander; Schulz, Karsten

    2017-01-01

    The cost effective maintenance of underwater pressure pipes for sewage disposal in Austria requires the detection and localization of leakages. Extrusion of wastewater in lakes can heavily influence the water and bathing quality of surrounding waters. The Distributed Temperature Sensing (DTS) technology is a widely used technique for oil and gas pipeline leakage detection. While in pipeline leakage detection, fiber optic cables are installed permanently at the outside or within the protective...

  16. The evaluation of stress and piping support loads on RSG-GAS secondary cooling system

    International Nuclear Information System (INIS)

    Pustandyo, W.; Sitandung, Y. B.; Sujalmo, S.

    1998-01-01

    The evaluation of stress and piping support loads was evaluated on piping segment of secondary cooling water piping. In this paper, the analysis methods are presented with the use of computer code PS + CAEPIPE Version 3. 4. 05. W. From the selected pipe segment, the data of pipe characteristic, material properties, operation and design condition, equipment and support were used as inputs. The result of analysis show that stress and support loads if using location, kind and number of support equal with the system that have been installed for sustain load 3638 psi (node 160), thermal 13517 psi (node 90) and combination of sustain and thermal (node 90) 16747 psi. Meanwhile,if the optimization support, stress and support load for sustain load are respectively 4238 psi (node 10), thermal 13517 psi (node 90) and combination of sustain + thermal (node 90) 17350 psi. The limit values of permitted support based on Code PS+CAEPIPE of sustain load are 15000 psi, thermal 22500 psi and combination of sustain + thermal 37500 psi. The conclusion of evaluation result, that stress support load of pipe secondary cooling system are sufficiently low and using support show excessive and not economic

  17. An investigation of particle behavior in gas-solid horizontal pipe flow by an extended LDA technique

    Energy Technology Data Exchange (ETDEWEB)

    Yong Lu; Donald H. Glass; William J. Easson [University of Edinburgh, Edinburgh (United Kingdom). Institute for Materials and Processes

    2009-12-15

    An extended Laser Doppler Anemometry (LDA) technique has been developed to measure the distributions of particle velocities and particle number rates over a whole pipe cross-section in a dilute pneumatic conveying system. The first extension concentrates on the transform matrix for predicting the laser beams' cross point in a pipe according to the shift coordinate of the 3D computer-controlled traverse system on which the probes of the LDA system were mounted. The second focuses on the proper LDA sample rate for the measurement of gas-solid pipe flow with polydisperse particles. A suitable LDA sample rate should ensure that enough data is recorded in the measurement interval to precisely calculate the particle mean velocity or other statistical values at every sample point. The present study explores the methodology as well as the fundamentals of measurements, using a laser facility, of the cross-sectional distributions of solid phase. In the horizontal gas-solid pipe flow (glass beads less than 110 {mu}m), the experimental data show that the cross-sectional flow patterns of the solid phase can be classified by annulus-like flow describing the axial particle velocity contours and stratified flow characterising particle number rate distribution over a cross-section. Thus, the cross-sectional flow pattern of the solid phase in a horizontal pipe may be annular or stratified dependent on whether the axial particle velocity or particle number rate is the phenomenon studied. 13 refs., 16 figs., 1 tab.

  18. Device for overlapping of a column of pump compressor pipes

    Energy Technology Data Exchange (ETDEWEB)

    Sharafutdinov, I.G.; Akhmerov, M.N.; Asadullin, Kh.F.; Prokopov, O.I.

    1980-02-16

    A device is proposed for automatic overlapping of pump compressor pipes of gushing petroleum and gas wells when losses occur near the well. The objective of the invention is to increase efficiency of the overlapping of the pipe column by recharging the device directly at the hole without disassembling the head equipment. This objective is achieved as follows. The device is equipped with elastic spacers located in the channels of a ring. They are mounted with the possibility of interaction with ball catches. A drawing and description of the device are given.

  19. Fluid flow analysis of E-glass fiber reinforced pipe joints in oil and gas industry

    Science.gov (United States)

    Bobba, Sujith; Leman, Z.; Zainuddin, E. S.; Sapuan, S. M.

    2018-04-01

    Glass Fiber reinforced composites have become increasingly important over the past few years and now they are the first choice materials for fabricating pipes with low weight in combination with high strength and stiffness. In Oil And Gas Industry, The Pipelines transporting heavy crude oil are subjected to variable pressure waves causing fluctuating stress levels in the pipes. Computational Fluid Dynamics (CFD) analysis was performed using solid works flow stimulation software to study the effects of these pressure waves on some specified joints in the pipes. Depending on the type of heavy crude oil being used, the flow behavior indicated a considerable degree of stress levels in certain connecting joints, causing the joints to become weak over a prolonged period of use. This research proposes a new perspective that is still required to be developed regarding the change of the pipe material, fiber winding angle in those specified joints and finally implementing cad wind technology to check the output result of the stress levels so that the life of the pipes can be optimized.

  20. Applied multiphase flow in pipes and flow assurance oil and gas production

    CERN Document Server

    Al-Safran, Eissa M

    2017-01-01

    Applied Multiphase Flow in Pipes and Flow Assurance - Oil and Gas Production delivers the most recent advancements in multiphase flow technology while remaining easy to read and appropriate for undergraduate and graduate petroleum engineering students. Responding to the need for a more up-to-the-minute resource, this highly anticipated new book represents applications on the fundamentals with new material on heat transfer in production systems, flow assurance, transient multiphase flow in pipes and the TUFFP unified model. The complex computation procedure of mechanistic models is simplified through solution flowcharts and several example problems. Containing over 50 solved example problems and 140 homework problems, this new book will equip engineers with the skills necessary to use the latest steady-state simulators available.

  1. Heat pipe

    International Nuclear Information System (INIS)

    Triggs, G.W.; Lightowlers, R.J.; Robinson, D.; Rice, G.

    1986-01-01

    A heat pipe for use in stabilising a specimen container for irradiation of specimens at substantially constant temperature within a liquid metal cooled fast reactor, comprises an evaporator section, a condenser section, an adiabatic section therebetween, and a gas reservoir, and contains a vapourisable substance such as sodium. The heat pipe further includes a three layer wick structure comprising an outer relatively fine mesh layer, a coarse intermediate layer and a fine mesh inner layer for promoting unimpeded return of condensate to the evaporation section of the heat pipe while enhancing heat transfer with the heat pipe wall and reducing entrainment of the condensate by the upwardly rising vapour. (author)

  2. Round dance in pipes; Runddans i roer

    Energy Technology Data Exchange (ETDEWEB)

    Steensen, Anders J.

    2004-07-01

    On the offshore production plants, oil, water, and gas are separated from the well streams. The oil is sold on the market while the gas is in part exported, in part reinjected into the wells in large quantities to sustain the pressure in the reservoirs. The water is cleaned, some is pumped to the sea and some returned to the reservoir. Although these processes may seem straightforward, they cause a great deal of worry since there are so many complex processing and pipe systems taking up space. Pipes vibrate and make noise, most often because of pressure fluctuations created by the flowing liquid and gas. Or vortices form inside the pipe that make the whole pipe drone. In the offshore activities, these phenomena can be very annoying; on the Statfjord B platform people baulked at entering the area where the produced water treatment system was standing. A new system had to be developed since existing equipment would take up too much space. In the new system, a pipe section is installed in the pipeline that makes the gas/liquid mixture spin rapidly as in a centrifuge. The gas collects along the centre of the pipe and is tapped off. The principle can also be used to separate liquid from gas. In many gas treatment systems, liquid accumulation, or carry over, is detrimental. But gas dehydrators are usually dimensioned for a minimal content of liquid in the gas. Important features of these new pipe-based separators are that they are small, remove bottlenecks in the production, and are straightforward to install. But operators who live with the problems every day are very sceptical about the new separators and should be given the opportunity to test them on land before they are installed in the field.

  3. A fatigue initiation parameter for gas pipe steel submitted to hydrogen absorption

    Energy Technology Data Exchange (ETDEWEB)

    Capelle, J; Gilgert, J; Pluvinage, G [LaBPS - Ecole Nationale d' Ingenieurs de Metz et Universite Paul Verlaine Metz, Ile du Saulcy, 57045 Metz (France)

    2010-01-15

    Fatigue initiation resistance has been determined on API 5L X52 gas pipe steel. Tests have been performed on Roman Tile (RT) specimen and fatigue initiation was detected by acoustic emission. A comparison between specimens electrolytically charged with hydrogen and specimens without hydrogen absorption were made and it has been noted that fatigue initiation time is reduced of about 3 times when hydrogen embrittlement occurs. It has been proposed to use the concept of Notch Stress Intensity Factor as parameter to describe the fatigue initiation process. Due to the fact that hydrogen is localised in area with high hydrostatic pressure, definitions of local effective stress and distance have been modified when hydrogen is absorbed. This modification can be explained by existence of a ductile-brittle transition with hydrogen concentration. The fatigue initiation resistance curve allows that to determine a threshold for large number of cycles of fatigue non initiation. This parameter introduced in a Failure Assessment Diagram (FAD) provides supplementary information about defect nocivity in gas pipes: a non-critical defect can be detected as dormant or not dormant defect i.e., as non propagating defect. (author)

  4. Automatic leak location in a pipe; Localizador automatico de fugas en un ducto

    Energy Technology Data Exchange (ETDEWEB)

    Carrera Mendez, Rolando; Verde Rodarte, Cristina [Universidad Nacional Autonoma de Mexico (Mexico)

    2001-06-01

    A real time method for detecting and locating leaks in pipes is analysed. By monitoring pressure gradients of a pipe in a steady state operation, expressions that indicate the existence of a leak and its location are derived. For small leaks it is possible to deduce alternative expressions based on in- and outflow deviations from their normal values. These deviations are estimated by means of a nonlinear dynamic flow observer. It is an easy task to carry out this system and the detection and location algorithm require low resource. As a result of this analysis it was found that the identifier is very sensitive to variations of the D'Arcy-Weissbach friction. [Spanish] Se describe y analiza un metodo que permite detectar y ubicar fugas de liquidos en un ducto sin tomas laterales en tiempo real. A partir de una operacion en estado permanente y del monitoreo de los gradientes de presion en los extremos de la tuberia, se derivan expresiones que permiten detectar la existencia de una fuga y su localizacion. Tambien se muestra que para fugas pequenas se pueden obtener expresiones alternativas para la deteccion y localizacion, basadas en las desviaciones de los flujos con respecto a sus valores nominales. Dicha desviacion se estima con un observador dinamico no lineal del comportamiento de flujo. La realizacion es de facil implantacion y el algoritmo se deteccion y localizacion requiere de pocos recursos de computacion. Del analisis presentado se desprende que el localizador es muy sensible a las variaciones en la estimacion de la friccion de D'Arcy-Weissbach del ducto.

  5. Simplified pipe gun

    International Nuclear Information System (INIS)

    Sorensen, H.; Nordskov, A.; Sass, B.; Visler, T.

    1987-01-01

    A simplified version of a deuterium pellet gun based on the pipe gun principle is described. The pipe gun is made from a continuous tube of stainless steel and gas is fed in from the muzzle end only. It is indicated that the pellet length is determined by the temperature gradient along the barrel right outside the freezing cell. Velocities of around 1000 m/s with a scatter of +- 2% are obtained with a propellant gas pressure of 40 bar

  6. Review of the use of rigid and high-impact PVC pipes in natural gas distribution systems in the Netherlands

    Energy Technology Data Exchange (ETDEWEB)

    Mutter, F; Benjamin, P

    1974-08-01

    Because of a number of instances of stress corrosion cracking or crazing occurring in PVC pipes used in Dutch gas distribution systems, VEG-GASINSTITUUT began an intensive investigation of rigid PVC pipes and high-impact pipes in distribution use under various conditions and with varying service lives. The work led to an investigation of laboratory testing techniques in which the stress-cracking phenomenon found in practice could be duplicated under controllable conditions. Pipes of various materials were examined for their resistance to stress cracking, then this resistance was compared with other long- and short-term physical properties of the material.

  7. Strength analysis of copper gas pipeline span

    OpenAIRE

    Ianevski, Philipp

    2016-01-01

    The purpose of the study was to analyze the stresses in a gas pipeline. While analyzing piping systems located inside building were used. Calculation of the strength of a gas pipeline is done by using information of the thickness of pipe walls, by choosing the suitable material, inner and outer diameter for the pipeline. Data for this thesis was collected through various internet sources and different books. From the study and research, the final results were reached and calculations were ...

  8. 46 CFR 154.908 - Inert gas generator: Location.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Inert gas generator: Location. 154.908 Section 154.908 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SAFETY... Atmospheric Control in Cargo Containment Systems § 154.908 Inert gas generator: Location. (a) Except as...

  9. Transients in pipes

    International Nuclear Information System (INIS)

    Marchesin, D.; Paes-Leme, P.J.S.; Sampaio, R.

    1981-01-01

    The motion of a fluid in a pipe is commonly modeled utilizing the one space dimension conservation laws of mass and momentum. The development of shocks and spikes utilizing the uniform sampling method is studied. The effects of temperature variations and friction are compared for gas pipes. (Author) [pt

  10. Useful effectiveness of plastic pipes for gas pipelines operating at low pressure

    Energy Technology Data Exchange (ETDEWEB)

    Zayutsev, K I

    1976-06-01

    Because a significant portion of the feeder lines in the Soviet union operate at relatively low pressures up to 75 to 150 psi, it is economically feasible to replace the conventional pipeline material (steel) with plastic. Cost savings result from lower material costs and ease of laying plastic pipe. Because of stiffness and corrosion requirements, the steel pipe used for these low-pressure pipelines is much thicker than needed to withstand the pressure used. Data are tabulated on the comparative costs and manpower requirements for the construction of 1 km of steel, polyvinyl chloride, and polyethylene gas pipelines ranging in diameter from 3 to 14 in. Generally, the plastic pipelines required 15 to 30% less man-days and were 20 to 35% lower in cost to build. The plastic pipelines can operate at 150 to 175 psi pressure and at temperatures up to 100 to 140/sup 0/F. In research conducted at VNIIST (All-Union Research Institute for the Construction of Trunk Pipelines) on plastic pipelines, a 2.5-mile test section has been operating successfully for 2 years, and new techniques and equipment for joining plastic pipe up to 25-in. diameter are being developed.

  11. Rate of Isotope Exchange Reaction Between Tritiated Water in a Gas Phase and Water on the Surface of Piping Materials

    International Nuclear Information System (INIS)

    Nakashio, Nobuyuki; Yamaguchi, Junya; Kobayashi, Ryusuke; Nishikawa, Masabumi

    2001-01-01

    The system effect of tritium arises from the interaction of tritium in the gas phase with water on the surface of piping materials. It has been reported that the system effect can be quantified by applying the serial reactor model to the piping system and that adsorption and isotope exchange reactions play the main roles in the trapping of tritium. The isotope exchange reaction that occurs when the chemical form of tritium in the gas phase is in the molecular form, i.e., HT or T 2 , has been named isotope exchange reaction 1, and that which occurs when tritium in the gas phase is in water form, i.e., HTO or T 2 O, has been named isotope exchange reaction 2.The rate of isotope exchange reaction 2 is experimentally quantified, and the rate is observed to be about one-third of the rate of adsorption. The trapping and release behavior of tritium from the piping surface due to isotope exchange reaction 2 is also discussed. It is certified that swamping of water vapor to process gas is effective to release tritium from the surface contaminated with tritium

  12. Advanced industrial ceramic heat pipe recuperators

    Energy Technology Data Exchange (ETDEWEB)

    Strumpf, H.J.; Stillwagon, T.L.; Kotchick, D.M.; Coombs, M.G.

    1988-01-01

    This paper summarizes the results of an investigation involving the use of ceramic heat pipe recuperators for high-temperature heat recovery from industrial furnaces. The function of the recuperator is to preheat combustion air with furnace exhaust gas. The heat pipe recuperator comprises a bundle of individual ceramic heat pipes acting in concert, with a partition separating the air and exhaust gas flow streams. Because each heat pipe is essentially an independent heat exchanger, the failure of a single tube does not compromise recuperator integrity, has only a minimal effect on overall heat exchanger performance and enables easier replacement of individual heat pipes. In addition, the heat pipe acts as an essentially isothermal heat transfer device, leading to a high thermodynamic efficiency. Cost estimates developed for heat pipe recuperator systems indicate favorable payback periods. Laboratory studies have demonstrated the feasibility of fabricating the required ceramic tubes, coating the inside of the tubes with CVD tungsten, and sealing the heat pipe with an electron-beam-welded or vacuum-brazed end cap.

  13. Promethus Hot Leg Piping Concept

    International Nuclear Information System (INIS)

    AM Girbik; PA Dilorenzo

    2006-01-01

    The Naval Reactors Prime Contractor Team (NRPCT) recommended the development of a gas cooled reactor directly coupled to a Brayton energy conversion system as the Space Nuclear Power Plant (SNPP) for NASA's Project Prometheus. The section of piping between the reactor outlet and turbine inlet, designated as the hot leg piping, required unique design features to allow the use of a nickel superalloy rather than a refractory metal as the pressure boundary. The NRPCT evaluated a variety of hot leg piping concepts for performance relative to SNPP system parameters, manufacturability, material considerations, and comparison to past high temperature gas reactor (HTGR) practice. Manufacturability challenges and the impact of pressure drop and turbine entrance temperature reduction on cycle efficiency were discriminators between the piping concepts. This paper summarizes the NRPCT hot leg piping evaluation, presents the concept recommended, and summarizes developmental issues for the recommended concept

  14. Pipe support optimization in nuclear power plants

    International Nuclear Information System (INIS)

    Cleveland, A.B.; Kalyanam, N.

    1984-01-01

    A typical 1000 MWe nuclear power plant consists of 80,000 to 100,000 feet of piping which must be designed to withstand earthquake shock. For the required ground motion, seismic response spectra are developed for safety-related structures. These curves are used in the dynamic analysis of piping systems with pipe-stress analysis computer codes. To satisfy applicable Code requirements, the piping systems also require analysis for weight, thermal and possibly other lasting conditions. Bechtel Power Corporation has developed a design program called SLAM (Support Location Algorithm) for optimizing pipe support locations and types (rigid, spring, snubber, axial, lateral, etc.) while satisfying userspecified parameters such as locations, load combinations, stress and load allowables, pipe displacement and cost. This paper describes SLAM, its features, applications and benefits

  15. Minimisation of pressure pulsations in the screw compressor discharge piping

    Energy Technology Data Exchange (ETDEWEB)

    Zaytsev, D. [Grasso GmbH Refrigeration Technology, Berlin (Germany). R and D Screw Compressors

    2006-07-01

    A problem of noise and vibration in the piping between the screw compressor and oil separator arises if the natural gas pulsations in the piping get in the resonance with the pulsations sent by the compressor. Several typical piping geometries such as a short and a long pipe with the open end and a short pipe with agglomerator have been studied to evaluate the natural frequency of the gas column. It was found that because of the wave reflection from the open pipe end the gas in such a pipe has several natural frequencies dependent on the sound speed and on the pipe length. Since the sound speed of various refrigerants differs significantly, the resonance pipe length will also vary strongly from one refrigerant to another. Hence, to avoid the resonance a separate examination for each refrigerant would be required at the compressor package design stage. Unlike open ended pipes, in the pipe with agglomerator the wave reflection at the agglomerator side is reduced. This allows using of one standard discharge pipe geometry resonance-free independent on the refrigerant. (orig.)

  16. Heat pipe turbine vane cooling

    Energy Technology Data Exchange (ETDEWEB)

    Langston, L.; Faghri, A. [Univ. of Connecticut, Storrs, CT (United States)

    1995-10-01

    The applicability of using heat pipe principles to cool gas turbine vanes is addressed in this beginning program. This innovative concept involves fitting out the vane interior as a heat pipe and extending the vane into an adjacent heat sink, thus transferring the vane incident heat transfer through the heat pipe to heat sink. This design provides an extremely high heat transfer rate and an uniform temperature along the vane due to the internal change of phase of the heat pipe working fluid. Furthermore, this technology can also eliminate hot spots at the vane leading and trailing edges and increase the vane life by preventing thermal fatigue cracking. There is also the possibility of requiring no bleed air from the compressor, and therefore eliminating engine performance losses resulting from the diversion of compressor discharge air. Significant improvement in gas turbine performance can be achieved by using heat pipe technology in place of conventional air cooled vanes. A detailed numerical analysis of a heat pipe vane will be made and an experimental model will be designed in the first year of this new program.

  17. Pipe rupture test results: 4-inch pipe whip tests under PWR LOCA conditions

    International Nuclear Information System (INIS)

    Miyazaki, Noriyuki; Ueda, Shuzo; Isozaki, Toshikuni; Kato, Rokuro; Kurihara, Ryoichi; Yano, Toshikazu; Miyazono, Shohachiro

    1982-09-01

    This report summarizes the results of 4-inch pipe whip tests (RUN No. 5506, 5507, 5508 and 5604) under the PWR LOCA conditions. The dynamic behaviors of the test pipe and restraints were studied in the tests. In the tests, the gap between the test pipe and the restraints was kept at the constant value of 8.85 mm and the overhang length was varied from 250 mm to 650 mm. The dynamic behaviors of the test pipe and the restraint were made clear by the outputs of strain gages and the measurements of residual deformations. The data of water hammer in subcooled water were also obtained by the pressure transducers mounted on the test pipe. The main conclusions obtained from the tests are as follows. (1) The whipping of pipe can be prevented more effectively as the overhang length becomes shorter. (2) The load acting on the restraint-support structure becomes larger as the overhang length becomes shorter. (3) The restraint farther from the break location does not limit the pipe movement except for the first impact when the overhang length is long. (4) The ultimate moment M sub(u) of the pipe at the restraint location can be used to predict the plastic collapse of the whipping pipe. (5) The restraints slide along the pipe axis and are subjected to bending moment, when the overhang length is long. (author)

  18. Characteristics of DC electrical braking method of the gas circulator to limit the temperature rise at the heat transfer pipes in the HTTR

    International Nuclear Information System (INIS)

    Kawasaki, K.; Saito, K.; Iyoku, T.

    2001-01-01

    In the safety evaluation of a High Temperature Engineering Test Reactor (HTTR), it must be confirmed that the core has no chance to be damaged and the barrier against the FP release is designed properly not to be affecting the influence of radiation around the reactor site. Especially the maximum temperature of the reactor pressure boundary such as the heat transfer pipes of pressurized water cooler (PWC) must not exceed the permissible values under an anticipated accident such as pipe of rupture in PWC. A requirement for the gas circulator which circulates helium gas in the primary cooling line and the secondary cooling line, is to be braked within 10 seconds by an electrical braking method after the HTTR reactor has scrammed under the accident in PWC. The reason is that the temperature rise of the heat transfer pipe at PWC has to be suppressed when the gas circulator has stopped, the revolution of the gas circulator decreases like the free coast down so that it takes about 90 seconds to be zero and the temperature rise of the pipe in the PWC exceeds the permissible value. By braking within 10 secs., the temperature of the pipe in the PWC reaches about 368 deg. C, less than the permissible value. Using a simplified equivalent circuit of an induction motor, braking time analysis was performed with obtained electrical resistance and inductance. The obtained braking time is about 10 secs., showing close agreement with analysis values. (author)

  19. Fault location method for unexposed gas trunk line insulation at stray current constant effect area

    Science.gov (United States)

    Tsenev, A. N.; Nosov, V. V.; Akimova, E. V.

    2017-10-01

    For the purpose of gas trunk lines safe operation, two types of pipe wall metal anticorrosion protection are generally used - the passive (insulation coating) protection and the active (electrochemical) protection. In the process of a pipeline long-term operation, its insulation is subject to wear and damage. Electrochemical protection means of a certain potential value prevent metal dissolution in the soil. When insulation wear and tear attains a level of insufficiency of the protection potential value, the insulating coating needs repair which is a labor-consuming procedure. To reduce the risk of such situation, it is necessary to make inspection rounds to monitor the condition of pipe insulation. A method for pipeline insulation coating unexposed fault location based on Pearson method is considered, wherein a working cathodic protection station signal of 100 Hz frequency is used, which makes installation of a generator unnecessary, and also a specific generator signal of 1 kHz frequency is used at high noise immunity and sensitivity of the instrument complex. This method enables detection and sizing of unexposed pipeline defects within the zones of earth current permanent action. High noise immunity of selective indicators allows for operation in proximity to 110 kV, 220 kV, and 500 kV power transmission lines in action.

  20. Heat pipe air preheater for gas-/oil-fired power plants

    International Nuclear Information System (INIS)

    Teixeira, D.P.

    1993-02-01

    With the rising costs of fuel, utilities are constantly looking for ways to improve the net plant heat rate of new and existing units. Significant heat rate improvements can be obtained by reducing the exit stack flue gas temperature. This project evaluated two technologies to reduce flue gas temperatures: heat pipes and liquid-coupled heat exchangers. The specific unit chosen for evaluating these systems was Pacific Gas ampersand Electric's 750 MW Moss Landing Power Plant, Unit 7. Both natural gas and low sulfur (0.5%) fuel oil are fired at this plant. Accordingly, the heat exchangers were required to operate on both fuels. This study investigated the heat recovery installation through the preliminary engineering level of detail. At the conclusion of this effort, the results indicated that neither concept was economically attractive for the retrofit situation involved. In addition, several major technical questions remained unresolved concerning the design of a single heat-exchange device capable of operating on gas (sulfur-free) and oil (sulfur-containing) environments over the full normal operating load range. While the technologies this study reviewed have been installed in actual power plant applications, the site-specific aspects of Moss Landing Unit 7 significantly influenced the estimated costs and performance of each alternative. Using more cost-effective and corrosion-resistant materials may help reduce costs. The following conditions would further enhance the viability of lowering exit gas temperatures: Higher capacity factors; rising fuel costs; greater use of sulfur-free fuels, such as natural gas; lower manufacturing costs for heat exchanger technologies; or new unit application

  1. Influence of pipe material and surfaces on sulfide related odor and corrosion in sewers.

    Science.gov (United States)

    Nielsen, Asbjørn Haaning; Vollertsen, Jes; Jensen, Henriette Stokbro; Wium-Andersen, Tove; Hvitved-Jacobsen, Thorkild

    2008-09-01

    Hydrogen sulfide oxidation on sewer pipe surfaces was investigated in a pilot scale experimental setup. The experiments were aimed at replicating conditions in a gravity sewer located immediately downstream of a force main where sulfide related concrete corrosion and odor is often observed. During the experiments, hydrogen sulfide gas was injected intermittently into the headspace of partially filled concrete and plastic (PVC and HDPE) sewer pipes in concentrations of approximately 1,000 ppm(v). Between each injection, the hydrogen sulfide concentration was monitored while it decreased because of adsorption and subsequent oxidation on the pipe surfaces. The experiments showed that the rate of hydrogen sulfide oxidation was approximately two orders of magnitude faster on the concrete pipe surfaces than on the plastic pipe surfaces. Removal of the layer of reaction (corrosion) products from the concrete pipes was found to reduce the rate of hydrogen sulfide oxidation significantly. However, the rate of sulfide oxidation was restored to its background level within 10-20 days. A similar treatment had no observable effect on hydrogen sulfide removal in the plastic pipe reactors. The experimental results were used to model hydrogen sulfide oxidation under field conditions. This showed that the gas-phase hydrogen sulfide concentration in concrete sewers would typically amount to a few percent of the equilibrium concentration calculated from Henry's law. In the plastic pipe sewers, significantly higher concentrations were predicted because of the slower adsorption and oxidation kinetics on such surfaces.

  2. Evaluation of stresses in large diameter, thin walled piping at support locations

    International Nuclear Information System (INIS)

    Bryan, B.J.; Flanders, H.E. Jr.; Rawls, G.B. Jr.

    1992-01-01

    The highest stresses in many thin walled piping systems are the local stresses at the pipe supports. These secondary stresses are caused by saddles or other structural discontinuities that restrain pipe ovalization. A static analysis of a thin walled pipe supported on structural steel saddle under dead weight loading is presented. The finite element analysis is performed using a shell model with distributed gravity and hydrostatic pressure loading. Parametric studies on global and local stress are performed to determine the effect of the pipe diameter to thickness ratio. Two aspects of the saddle design are also investigated: the effect of saddle width, and the effect of saddle wrap angle. Additionally, the computed stresses are compared to closed form solutions

  3. Seismic test of high temperature piping for HTGR

    International Nuclear Information System (INIS)

    Kobatake, Kiyokazu; Midoriyama, Shigeru; Ooka, Yuzi; Suzuki, Michiaki; Katsuki, Taketsugu

    1983-01-01

    Since the high temperature pipings for the high temperature gas-cooled reactor contain helium gas at 1000 deg C and 40 kgf/cm 2 , the double-walled pipe type consisting of the external pipe serving as the pressure boundary and the internal pipe with heat insulating structure was adopted. Accordingly, their aseismatic design is one of the important subjects. Recently, for the purpose of grasping the vibration characteristics of these high temperature pipings and obtaining the data required for the aseismatic design, two specimens, that is, a double-walled pipe model and a heat-insulating structure, were made, and the vibration test was carried out on them, using a 30 ton vibration table of Kawasaki Heavy Industries Ltd. In the high temperature pipings of the primary cooling system for the multi-purpose, high temperature gas-cooled experimental reactor, the external pipes of 32 B bore as the pressure boundary and the internal pipes of 26 B bore with internal heat insulation consisting of double layers of fiber and laminated metal insulators as the temperature boundary were adopted. The testing method and the results are reported. As the spring constant of spacers is larger and clearance is smaller, the earthquake wave response of double-walled pipes is smaller, and it is more advantageous. The aseismatic property of the heat insulation structure is sufficient. (Kako, I.)

  4. Chemical laser exhaust pipe design research

    Science.gov (United States)

    Sun, Yunqiang; Huang, Zhilong; Chen, Zhiqiang; Ren, Zebin; Guo, Longde

    2016-10-01

    In order to weaken the chemical laser exhaust gas influence of the optical transmission, a vent pipe is advised to emissions gas to the outside of the optical transmission area. Based on a variety of exhaust pipe design, a flow field characteristic of the pipe is carried out by numerical simulation and analysis in detail. The research results show that for uniform deflating exhaust pipe, although the pipeline structure is cyclical and convenient for engineering implementation, but there is a phenomenon of air reflows at the pipeline entrance slit which can be deduced from the numerical simulation results. So, this type of pipeline structure does not guarantee seal. For the design scheme of putting the pipeline contract part at the end of the exhaust pipe, or using the method of local area or tail contraction, numerical simulation results show that backflow phenomenon still exists at the pipeline entrance slit. Preliminary analysis indicates that the contraction of pipe would result in higher static pressure near the wall for the low speed flow field, so as to produce counter pressure gradient at the entrance slit. In order to eliminate backflow phenomenon at the pipe entrance slit, concerned with the pipeline type of radial size increase gradually along the flow, flow field property in the pipe is analyzed in detail by numerical simulation methods. Numerical simulation results indicate that there is not reflow phenomenon at entrance slit of the dilated duct. However the cold air inhaled in the slit which makes the temperature of the channel wall is lower than the center temperature. Therefore, this kind of pipeline structure can not only prevent the leak of the gas, but also reduce the wall temperature. In addition, compared with the straight pipe connection way, dilated pipe structure also has periodic structure, which can facilitate system integration installation.

  5. 46 CFR 119.430 - Engine exhaust pipe installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Engine exhaust pipe installation. 119.430 Section 119... INSTALLATION Specific Machinery Requirements § 119.430 Engine exhaust pipe installation. (a) The design of all... an exhaust pipe. (b) Exhaust gas must not leak from the piping or any connections. The piping must be...

  6. Monitoring the mass of UF6 gas and uranium deposits in aluminium pipes using X-ray fluorescence and X-ray transmission gauges

    International Nuclear Information System (INIS)

    Packer, T.W.; Smith, S.M.

    1984-12-01

    In order to determine the enrichment of UF 6 gas in centrifuge plant pipework it is necessary to measure the mass of the gas (pressure) and the mass per unit area of any uranium deposited on the pipe. This paper shows that it is possible to determine the pressure of the UF 6 gas in pipes 120 mm in diameter using an energy-dispersive X-ray fluorescence spectrometer. Results are also given of transmission measurements made using a low power X-ray generator operated at two different applied voltages. A method of using the two measurements to determine the mass per unit area of deposited uranium is described. (author)

  7. Design and testing of a heat pipe gas combustion system for the STM4-120 Stirling engine

    Science.gov (United States)

    Khalili, K.; Godett, T. M.; Meijer, R. J.; Verhey, R. P.

    Evaporators of a novel geometry, designed to have a more compact size yet the same output as larger, conventional heat pipes, have been fabricated and tested. A technique was developed to calculate capillary pressure required inside the heat pipe. Several quarter- and full-scale evaporators were designed and successfully tested. The burner, film-cooled combustion chamber, and preheater were designed and tested separately. A complete heat pipe gas combustion system (HPGC) was tested, showing an efficiency of 89 percent was measured at 20 kWth. A film-cooled combustion chamber was tested with flame temperatures of 2200 C and wall temperatures below 1000 C using preheated air for film cooling. Also, a full-scale HPGC was tested at an excess of 95 kWth, showing efficiency in the range of 85 to 90 percent under steady-state conditions. Results of transient and startup tests, carried out to evaluate the performance of the heat pipe, all also reported.

  8. Heat-Pipe-Associated Localized Thermoelectric Power Generation System

    Science.gov (United States)

    Kim, Pan-Jo; Rhi, Seok-Ho; Lee, Kye-Bock; Hwang, Hyun-Chang; Lee, Ji-Su; Jang, Ju-Chan; Lee, Wook-Hyun; Lee, Ki-Woo

    2014-06-01

    The present study focused on how to improve the maximum power output of a thermoelectric generator (TEG) system and move heat to any suitable space using a TEG associated with a loop thermosyphon (loop-type heat pipe). An experimental study was carried out to investigate the power output, the temperature difference of the thermoelectric module (TEM), and the heat transfer performance associated with the characteristic of the researched heat pipe. Currently, internal combustion engines lose more than 35% of their fuel energy as recyclable heat in the exhaust gas, but it is not easy to recycle waste heat using TEGs because of the limited space in vehicles. There are various advantages to use of TEGs over other power sources, such as the absence of moving parts, a long lifetime, and a compact system configuration. The present study presents a novel TEG concept to transfer heat from the heat source to the sink. This technology can transfer waste heat to any location. This simple and novel design for a TEG can be applied to future hybrid cars. The present TEG system with a heat pipe can transfer heat and generate power of around 1.8 V with T TEM = 58°C. The heat transfer performance of a loop-type heat pipe with various working fluids was investigated, with water at high heat flux (90 W) and 0.05% TiO2 nanofluid at low heat flux (30 W to 70 W) showing the best performance in terms of power generation. The heat pipe can transfer the heat to any location where the TEM is installed.

  9. Causes of pipe ruptures in distribution lines. Evaluation of long-term observations in a metropolitan pipe network

    Energy Technology Data Exchange (ETDEWEB)

    Kottmann, A

    1978-01-01

    Pipe ruptures and their causes are examined from the viewpoints of pipe material, corrosion, traffic, internal pressure, air temperature, ground temperature, ground frost, gas or water temperature, and ground moisture level. The examination relies on 17 years of statistics (1958-74) from (1) Technische Werke der Stadt Stuttgart AG on 11,986 pipe ruptures and (2) German weather-service data on ground-moisture readings at depths down to 80 in. in the Stuttgart area. Faced with replacing up to 280 miles (450 km) of cast-iron gas-distribution lines that seemed extraordinarily prone to rupture (company records showed at least 20 breaks/month) after the conversion to natural gas, TWS authorized this study to determine the boundary conditions that make cast-iron pipe susceptible to fracture, thus minimizing the extent of the replacement program. The investigation showed that corrosion had only a slight effect upon cracking. No significant effect was found for any of the following: temperature-caused changes in material properties, internal pressure or pressure changes, fluctuations in gas temperature, changes in air temperature, and summertime changes in ground temperature. Stress loading by heavy traffic, however, doubled the fracture incidence.

  10. Characterization of radioactive contamination inside pipes with the Pipe Explorer trademark system

    International Nuclear Information System (INIS)

    Kendrick, D.T.; Cremer, C.D.; Lowry, W.; Cramer, E.

    1995-01-01

    The U.S. Department of Energy's nuclear facility decommissioning program needs to characterize radiological contamination inside piping systems before the pipe can be recycled, remediated, or disposed. Science and Engineering associates, Inc. under contract with the DOE Morgantown Energy Technology Center has developed and demonstrated the Pipe Explorer trademark system, which uses an inverting membrane to transport various characterization sensors into pipes. The basic process involves inverting (turning inside out) a tubular impermeable membrane under air pressure. A characterization sensor is towed down the interior of the pipe by the membrane. Advantages of this approach include the capability of deploying through constrictions in the pipe, around 90 degrees bends, vertically up and down, and in slippery conditions. Because the detector is transported inside the membrane (which is inexpensive and disposable), it is protected from contamination, which eliminates cross-contamination. Characterization sensors that have been demonstrated with the system thus far include: gamma detectors, beta detectors, video cameras, and pipe locators. Alpha measurement capability is currently under development. A remotely operable Pipe Explorer trademark system has been developed and demonstrated for use in DOE facilities in the decommissioning stage. The system is capable of deployment in pipes as small as 2-inch-diameter and up to 250 feet long. This paper describes the technology and presents measurement results of a field demonstration conducted with the Pipe Explorer trademark system at a DOE site. These measurements identify surface activity levels of U-238 contamination as a function of location in drain lines. Cost savings to the DOE of approximately $1.5 million dollars were realized from this one demonstration

  11. Pemanfaatan Energi Gas Buang Motor Diesel Stasioner Untuk Pemanas Air

    OpenAIRE

    Tirtoatmodjo, Rahardjo

    1999-01-01

    Exhaust gas from a diesel engine is having a big deal of energy. In a stationer diesel engine, the enthalpy of water will be increased by flowing the water in a spiral pipe which is located in the exhaust manifold of the engine. Using copper pipes in this heat exchanger, it's efficiency is found up to 69,5 %.

  12. Modelling of fiberglass pipe destruction process

    Directory of Open Access Journals (Sweden)

    А. К. Николаев

    2017-03-01

    Full Text Available The article deals with important current issue of oil and gas industry of using tubes made of high-strength composite corrosion resistant materials. In order to improve operational safety of industrial pipes it is feasible to use composite fiberglass tubes. More than half of the accidents at oil and gas sites happen at oil gathering systems due to high corrosiveness of pumped fluid. To reduce number of accidents and improve environmental protection we need to solve the issue of industrial pipes durability. This problem could be solved by using composite materials from fiberglass, which have required physical and mechanical properties for oil pipes. The durability and strength can be monitored by a fiberglass winding method, number of layers in composite material and high corrosion-resistance properties of fiberglass. Usage of high-strength composite materials in oil production is economically feasible; fiberglass pipes production is cheaper than steel pipes. Fiberglass has small volume weight, which simplifies pipe transportation and installation. In order to identify the efficiency of using high-strength composite materials at oil production sites we conducted a research of their physical-mechanical properties and modelled fiber pipe destruction process.

  13. Structural integrity evaluation of X52 gas pipes subjected to external corrosion defects using the SINTAP procedure

    Energy Technology Data Exchange (ETDEWEB)

    Adib-Ramezani, H. [Ecole Polytechnique de l' Universite d' Orleans, CNRS-CRMD, 8 rue Leonard de Vinci, 45072 Orleans Cedex 2 (France)]. E-mail: hradib_2000@yahoo.com; Jeong, J. [Ecole Polytechnique de l' Universite d' Orleans, CNRS-CRMD, 8 rue Leonard de Vinci, 45072 Orleans Cedex 2 (France); Pluvinage, G. [Laboratoire de Fiabilite Mecanique (LFM), Universite de Metz-ENIM, 57045 Metz (France)

    2006-06-15

    In the present study, the SINTAP procedure has been proposed as a general structural integrity tool for semi-spherical, semi-elliptical and long blunt notch defects. The notch stress intensity factor concept and SINTAP structural integrity procedure are employed to assess gas pipelines integrity. The external longitudinal defects have been investigated via elastic-plastic finite element method results. The notch stress intensity concept is implemented into SINTAP procedure. The safety factor is calculated via SINTAP procedure levels 0B and 1B. The extracted evaluations are compared with the limit load analysis based on ASME B31G, modified ASME B31G, DNV RP-F101 and recent proposed formulation [Choi JB, Goo BK, Kim JC, Kim YJ, Kim WS. Development of limit load solutions for corroded gas pipelines. Int J Pressure Vessel Piping 2003;80(2):121-128]. The comparison among extracted safety factors exhibits that SINTAP predictions are located between lower and upper safety factor bounds. The SINTAP procedure including notch-based assessment diagram or so-called 'NFAD' involves wide range of defect geometries with low, moderate and high stress concentrations and relative stress gradients. Finally, some inspired and advanced viewpoints have been investigated.

  14. Structural integrity evaluation of X52 gas pipes subjected to external corrosion defects using the SINTAP procedure

    International Nuclear Information System (INIS)

    Adib-Ramezani, H.; Jeong, J.; Pluvinage, G.

    2006-01-01

    In the present study, the SINTAP procedure has been proposed as a general structural integrity tool for semi-spherical, semi-elliptical and long blunt notch defects. The notch stress intensity factor concept and SINTAP structural integrity procedure are employed to assess gas pipelines integrity. The external longitudinal defects have been investigated via elastic-plastic finite element method results. The notch stress intensity concept is implemented into SINTAP procedure. The safety factor is calculated via SINTAP procedure levels 0B and 1B. The extracted evaluations are compared with the limit load analysis based on ASME B31G, modified ASME B31G, DNV RP-F101 and recent proposed formulation [Choi JB, Goo BK, Kim JC, Kim YJ, Kim WS. Development of limit load solutions for corroded gas pipelines. Int J Pressure Vessel Piping 2003;80(2):121-128]. The comparison among extracted safety factors exhibits that SINTAP predictions are located between lower and upper safety factor bounds. The SINTAP procedure including notch-based assessment diagram or so-called 'NFAD' involves wide range of defect geometries with low, moderate and high stress concentrations and relative stress gradients. Finally, some inspired and advanced viewpoints have been investigated

  15. Heat pipe heat exchangers in heat recovery systems

    Energy Technology Data Exchange (ETDEWEB)

    Stulc, P; Vasiliev, L L; Kiseljev, V G; Matvejev, Ju N

    1985-01-01

    The results of combined research and development activities of the National Research Institute for Machine Design, Prague, C.S.S.R. and the Institute for Heat and Mass Transfer, Minsk, U.S.S.R. concerning intensification heat pipes used in heat pipe heat exchangers are presented. This sort of research has been occasioned by increased interest in heat power economy trying to utilise waste heat produced by various technological processes. The developed heat pipes are deployed in construction of air-air, gas-air or gas-gas heat recovery exchangers in the field of air-engineering and air-conditioning. (author).

  16. Costs reduced by innovative plastic distribution pipe use

    International Nuclear Information System (INIS)

    Maxwell, F.W.

    1995-01-01

    As part of a strategic corporate cost-reduction initiative, Pacific Gas and Electric Company's Gas Distribution Group has achieved some quick but significant cash savings. System design, construction, and the purchasing function were areas that produced some fast paybacks while maintaining reliability and safety. The primary savings were made by optimizing pipe specifications to match system operating parameters. This allowed the use of smaller diameter pipes and/or thinner wall pipes which conserved the materials cost of the pipeline. Other realized savings in the form of coiled pipe, purchasing changes, and backfilling specifications are also described

  17. Pemanfaatan Energi Gas Buang Motor Diesel Stasioner untuk Pemanas Air

    OpenAIRE

    Rahardjo Tirtoatmodjo

    1999-01-01

    Exhaust gas from a diesel engine is having a big deal of energy. In a stationer diesel engine, the enthalpy of water will be increased by flowing the water in a spiral pipe which is located in the exhaust manifold of the engine. Using copper pipes in this heat exchanger, it's efficiency is found up to 69,5 %. Abstract in Bahasa Indonesia : Gas buang dari motor diesel masih memiliki sejumlah energi panas yang cukup tinggi. Pada motor diesel stasioner, dengan mengalirkan air pada pipa spiral ya...

  18. Study on pipe deflection by using numerical method

    Science.gov (United States)

    Husaini; Zaki Mubarak, Amir; Agustiar, Rizki

    2018-05-01

    Piping systems are widely used in a refinery or oil and gas industry. The piping system must be properly designed to avoid failure or leakage. Pipe stress analysis is conducted to analyze the loads and critical stress occurred, so that the failure of the pipe can be avoided. In this research, it is analyzed the deflection of a pipe by using Finite Element Method. The pipe is made of A358 / 304SS SCH10S Stainless Steel. It is 16 inches in size with the distance between supports is 10 meters. The fluid flown is Liquid Natural Gas (LNG) with the range of temperature of -120 ° C to -170 ° C, and a density of 461.1 kg / m 3. The flow of LNG causes deflection of the pipe. The pipe deflection must be within the permissible tolerable range. The objective is to analyze the deflection occurred in the piping system. Based on the calculation and simulation, the deflection is 4.4983 mm, which is below the maximum limit of deflection allowed, which is 20.3 mm.

  19. 46 CFR 182.430 - Engine exhaust pipe installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Engine exhaust pipe installation. 182.430 Section 182... 100 GROSS TONS) MACHINERY INSTALLATION Specific Machinery Requirements § 182.430 Engine exhaust pipe... equipment might come in contact with an exhaust pipe. (b) Exhaust gas must not leak from the piping or any...

  20. Literature review and experimental investigation of heat pipes

    Science.gov (United States)

    Barsch, W. O.; Schoenhals, R. J.; Viskanta, R.; Winter, E. R. F.

    1971-01-01

    Tests on heat pipes determine operational limits, external boundary conditions, noncondensable gas effects, startup behavior, and geometric configurations. Experiment consists of design, construction, and testing of an apparatus for measuring wick properties, conventional heat pipes and coplanar heat pipes.

  1. 78 FR 33403 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental...

    Science.gov (United States)

    2013-06-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF13-5-000] Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Leidy Southeast Expansion Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings The staff of the Federal...

  2. 77 FR 59391 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental...

    Science.gov (United States)

    2012-09-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12-497-000] Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Assesment for the Proposed Brandywine Creek Replacement Project; Request for Comments on Environmental Issues; and Notice of Public Scoping Meeting The staff of the Federal...

  3. 75 FR 42738 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental...

    Science.gov (United States)

    2010-07-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF10-16-000] Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Mid-Atlantic Connector Expansion Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting July 15, 2010. The...

  4. A mathematical model for leak location and leak area determination in pipeline networks

    Directory of Open Access Journals (Sweden)

    Oyedokun O.I.

    2013-01-01

    Full Text Available Prompt leak location and leak area determination in oil and gas pipeline installations is an indispensable approach to controlling petroleum products wastages in pipes. However, there is an evident lack of literature information on this subject. In this paper, we modelled leak location detection and leak area determination in pipes by applying two methodologies and gave an illustrative example using simulated data with the aid of Matlab. A comparison of these two approaches resulted in an error of 6.24%, suggesting that the closer the leak is to the measurement station, the lower will be the time interval between two successive waves that will pass through the leak and get to the measurement station. The relationship between the pipe area and coefficient of reflection is parabolic. This contribution is valuable to pipeline engineers in the economic control of leaks.

  5. Gas propagation following a sudden loss of vacuum in a pipe cooled by He I and He II.

    Science.gov (United States)

    Garceau, N.; Guo, W.; Dodamead, T.

    2017-12-01

    Many cryogenic systems around the world are concerned with the sudden catastrophic loss of vacuum for cost, preventative damage, safety or other reasons. The experiments in this paper were designed to simulate the sudden vacuum break in the beam-line pipe of a liquid helium cooled superconducting particle accelerator. This paper expands previous research conducted at the National High Magnetic Field Laboratory and evaluates the differences between normal helium (He I) and superfluid helium (He II). For the experiments, a straight pipe and was evacuated and immersed in liquid helium at 4.2 K and below 2.17 K. Vacuum loss was simulated by opening a solenoid valve on a buffer tank filled nitrogen gas. Gas front arrival was observed by a temperature rise of the tube. Preliminary results suggested that the speed of the gas front through the experiment decreased exponentially along the tube for both normal liquid helium and super-fluid helium. The system was modified to a helical pipe system to increase propagation length. Testing and analysis on these two systems revealed there was minor difference between He I and He II despite the difference between the two distinct helium phases heat transfer mechanisms: convection vs thermal counterflow. Furthermore, the results indicated that the temperature of the tube wall above the LHe bath also plays a significant role in the initial front propagation. More systematic measurements are planned in with the helical tube system to further verify the results.

  6. Design of a Novel In-Pipe Reliable Leak Detector

    OpenAIRE

    Chatzigeorgiou, Dimitrios; Youcef-Toumi, Kamal; Ben-Mansour, Rached

    2013-01-01

    Leakage is the major factor for unaccounted losses in every pipe network around the world (oil, gas, or water). In most cases, the deleterious effects associated with the occurrence of leaks may present serious economical and health problems. Therefore, leaks must be quickly detected, located, and repaired. Unfortunately, most state-of-the-art leak detection systems have limited applicability, are neither reliable nor robust, while others depend on the user experience. In this paper, we prese...

  7. 76 FR 40717 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental...

    Science.gov (United States)

    2011-07-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF11-4-000] Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Northeast Supply Link Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings The staff of the Federal Energy...

  8. Detection blockages and valve statues in natural gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Dawson, Karl; Short, Gordon; Wang, Xuesong [Pipeline Engineering Ltd, North Yorkshire, (United Kingdom); Lennox, Barry; Lewis, Keith; Turner, John [University of Manchester, Manchester, (United Kingdom); Lewis, Chris [BP exploration, Aberdeen, (United Kingdom)

    2010-07-01

    Detecting features in pipelines containing flowing gas is difficult. This paper investigated a patented acoustic reflectometry technique for detecting defects in gas pipelines. The basic concept of this technique is to inject a pulse of sound into a pipeline and then measure the reflections produced while the signal travels along the length of the pipe. A modification in the internal section of the pipe will produce a reflection which, given with the speed of sound in the gas within the pipeline, provides the location of the feature. Laboratory tests on a 16m rigid PVC pipe and two field trials were undertaken to test this new method. The results showed that acoustic reflectometry can be used to identify features resulting from blockages and leakages. The field tests demonstrated that the method is capable of surveying both small and large diameter pipelines with lengths up to 10 km.

  9. IPIRG-2 task 1 - pipe system experiments with circumferential cracks in straight-pipe locations. Final report, September 1991--November 1995

    Energy Technology Data Exchange (ETDEWEB)

    Scott, P.; Olson, R.; Marschall, C.; Rudland, D. [and others

    1997-02-01

    This report presents the results from Task 1 of the Second International Piping Integrity Research Group (IPIRG-2) program. The IPIRG-2 program is an international group program managed by the US Nuclear Regulatory Commission (US NRC) and funded by a consortium of organizations from 15 nations including: Bulgaria, Canada, Czech Republic, France, Hungary, Italy, Japan, Republic of Korea, Lithuania, Republic of China, Slovak Republic, Sweden, Switzerland, the United Kingdom, and the United States. The objective of the program was to build on the results of the IPIRG-1 and other related programs by extending the state-of-the-art in pipe fracture technology through the development of data needed to verify engineering methods for assessing the integrity of nuclear power plant piping systems that contain defects. The IPIRG-2 program included five main tasks: Task 1 - Pipe System Experiments with Flaws in Straight Pipe and Welds Task 2 - Fracture of Flawed Fittings Task 3 - Cyclic and Dynamic Load Effects on Fracture Toughness Task 4 - Resolution of Issues From IPIRG-1 and Related Programs Task 5 - Information Exchange Seminars and Workshops, and Program Management. The scope of this report is to present the results from the experiments and analyses associated with Task 1 (Pipe System Experiments with Flaws in Straight Pipe and Welds). The rationale and objectives of this task are discussed after a brief review of experimental data which existed after the IPIRG-1 program.

  10. IPIRG-2 task 1 - pipe system experiments with circumferential cracks in straight-pipe locations. Final report, September 1991--November 1995

    International Nuclear Information System (INIS)

    Scott, P.; Olson, R.; Marschall, C.; Rudland, D.

    1997-02-01

    This report presents the results from Task 1 of the Second International Piping Integrity Research Group (IPIRG-2) program. The IPIRG-2 program is an international group program managed by the US Nuclear Regulatory Commission (US NRC) and funded by a consortium of organizations from 15 nations including: Bulgaria, Canada, Czech Republic, France, Hungary, Italy, Japan, Republic of Korea, Lithuania, Republic of China, Slovak Republic, Sweden, Switzerland, the United Kingdom, and the United States. The objective of the program was to build on the results of the IPIRG-1 and other related programs by extending the state-of-the-art in pipe fracture technology through the development of data needed to verify engineering methods for assessing the integrity of nuclear power plant piping systems that contain defects. The IPIRG-2 program included five main tasks: Task 1 - Pipe System Experiments with Flaws in Straight Pipe and Welds Task 2 - Fracture of Flawed Fittings Task 3 - Cyclic and Dynamic Load Effects on Fracture Toughness Task 4 - Resolution of Issues From IPIRG-1 and Related Programs Task 5 - Information Exchange Seminars and Workshops, and Program Management. The scope of this report is to present the results from the experiments and analyses associated with Task 1 (Pipe System Experiments with Flaws in Straight Pipe and Welds). The rationale and objectives of this task are discussed after a brief review of experimental data which existed after the IPIRG-1 program

  11. 49 CFR 192.59 - Plastic pipe.

    Science.gov (United States)

    2010-10-01

    ... Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Materials § 192.59 Plastic pipe. (a) New plastic pipe...

  12. 49 CFR 192.55 - Steel pipe.

    Science.gov (United States)

    2010-10-01

    ... Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Materials § 192.55 Steel pipe. (a) New steel pipe is...

  13. A multiple-location model for natural gas forward curves

    International Nuclear Information System (INIS)

    Buffington, J.C.

    1999-06-01

    This thesis presents an approach for financial modelling of natural gas in which connections between locations are incorporated and the complexities of forward curves in natural gas are considered. Apart from electricity, natural gas is the most volatile commodity traded. Its price is often dependent on the weather and price shocks can be felt across several geographic locations. This modelling approach incorporates multiple risk factors that correspond to various locations. One of the objectives was to determine if the model could be used for closed-form option prices. It was suggested that an adequate model for natural gas must consider 3 statistical properties: volatility term structure, backwardation and contango, and stochastic basis. Data from gas forward prices at Chicago, NYMEX and AECO were empirically tested to better understand these 3 statistical properties at each location and to verify if the proposed model truly incorporates these properties. In addition, this study examined the time series property of the difference of two locations (the basis) and determines that these empirical properties are consistent with the model properties. Closed-form option solutions were also developed for call options of forward contracts and call options on forward basis. The options were calibrated and compared to other models. The proposed model is capable of pricing options, but the prices derived did not pass the test of economic reasonableness. However, the model was able to capture the effect of transportation as well as aspects of seasonality which is a benefit over other existing models. It was determined that modifications will be needed regarding the estimation of the convenience yields. 57 refs., 2 tabs., 7 figs., 1 append

  14. Performance of buried pipe installation.

    Science.gov (United States)

    2010-05-01

    The purpose of this study is to determine the effects of geometric and mechanical parameters : characterizing the soil structure interaction developed in a buried pipe installation located under : roads/highways. The drainage pipes or culverts instal...

  15. Location and assessment of drainage pipes beneath farm fields and golf course greens using ground penetrating radar: A research summary

    Science.gov (United States)

    Enhancing the efficiency of soil water removal, and in turn crop productivity, on farmland already containing a subsurface drainage system, typically involves installing new drain lines between the old ones. However, before this approach can be attempted, the older drainage pipes need to be located...

  16. Stratified flow instability and slug formation leading to condensation-induced water hammer in a horizontal refrigerant pipe

    International Nuclear Information System (INIS)

    Samuel Martin, C.

    2005-01-01

    Full text of publication follows: An experimental apparatus was designed for the purpose of investigating the phenomenon of condensation-induced water hammer in an ammonia refrigeration system. Water hammer was initiated by introducing warm ammonia gas over static subcooled ammonia liquid placed in a horizontal 146.3 mm diameter carbon steel pipe 6.0 m in length. By means of fast response piezoelectric pressure transducers and a high speed data acquisition system rapid dynamic pressures were recorded whenever a shock event occurred. Moreover, by means of top-mounted diaphragm pressure transducers the speed of liquid slugs propagating along the pipe was determined. The occurrence of condensation induced water hammer depended upon three major variables; namely, (1) initial liquid depth, (2) liquid temperature, and (3) mass flow rate of warm gas. For given liquid depth and temperature, once the warm gas threshold conditions were exceeded shocks occurred with greater magnitude as the mass flow rate of gas input was increased. With adequate subcooling condensation-induced water hammer occurred for initial liquid depths ranging from 25% to 95% of internal pipe diameter. The threshold mass flow rate of warm gas necessary to initiate water hammer was greater as the initial liquid depth was lowered. Based upon experimental results obtained from four pressure transducers located on the top of the test pipe conditions corresponding to bridging were ascertained. For various initial liquid depths the onset of instability from stratified flow to bridging was correlated with the Taitel-Dukler instability criterion. (author)

  17. Experimental and numerical investigation of stratified gas-liquid flow in inclined circular pipes

    International Nuclear Information System (INIS)

    Faccini, J.L.H.; Sampaio, P.A.B. de; Botelho, M.H.D.S.; Cunha, M.V.; Cunha Filho, J.S.; Su, J.

    2012-01-01

    In this paper, a stratified gas-liquid flow is experimentally and numerically investigated. Two measurement techniques, namely an ultrasonic technique and a visualization technique, are applied on an inclined circular test section using a fast single transducer pulse-echo technique and a high-speed camera. A numerical model is employed to simulate the stratified gas-liquid flow, formed by a system of non-linear differential equations consisting of the Reynolds averaged Navier-Stokes equations with the κ-ω turbulence model. The test section used in this work is comprised mainly of a transparent circular pipe with inner diameter 1 inch, and inclination angles varying from -2.5 to -10.0 degrees. Numerical solutions are obtained for the liquid height as a function of inclination angles, and compared with our own experimental data. (author)

  18. Heat-pipe thermionic reactor concept

    DEFF Research Database (Denmark)

    Storm Pedersen, E.

    1967-01-01

    Main components are reactor core, heat pipe, thermionic converter, secondary cooling system, and waste heat radiator; thermal power generated in reactor core is transported by heat pipes to thermionic converters located outside reactor core behind radiation shield; thermionic emitters are in direct...

  19. 77 FR 32626 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Impact...

    Science.gov (United States)

    2012-06-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF09-8-000] Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Impact Statement for the Planned Rockaway Delivery Lateral Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings The staff of the Federa...

  20. Condensation induced non-condensable accumulation in a non-vented horizontal pipe connected with an elbow and a vertical pipe

    International Nuclear Information System (INIS)

    Stevanovic, V.D.; Stosic, Z.V.; Stoll, U.

    2005-01-01

    In this paper the radiolytic gases (hydrogen and oxygen) accumulation is investigated numerically for the pipe geometry consisting of a horizontal pipe closed at one end, and connected via a downward directed elbow with a vertical pipe open at its bottom end. This configuration is a typical part of many pipeline systems or measuring lines. The steam inside the pipes is condensed due to heat losses to the surrounding atmosphere, the condensate is drained and the concentration of the remaining noncondensable radiolytic gases is increased. Three dimensional numerical simulations are performed with the thermal-hydraulic and physico-chemical code HELIO, especially developed for the simulation and analyses of radiolytic gases accumulation in pipelines. The HELIO code model is based on the mass, momentum and energy conservation equations for the gas mixture and wall condensate film flow, as well as on the transport equations for non-condensable diffusion and convection. At the liquid film surface, the phases are coupled through the no-slip velocity condition and the mass transfer due to steam condensation and non-condensable absorption and degassing. Obtained numerical results show the gas mixture and condensate liquid film flow fields. In case of here analyzed geometry, the gas mixture circulates in the elbow and the horizontal pipe due to buoyancy forces induced by concentration and related density differences. The circulation flow prevents the formation of the radiolytic gases concentration front. The non-condensable radiolytic gases are transported from the pipe through the open end by the mechanisms of diffusion and convection. The analyzed geometry is the same as in case of venting pipe mounted on the steam pipeline. The results are of practical importance since they show that radiolytic gases accumulation does not occur in the geometry of the venting pipes. (authors)

  1. Peach Bottom Atomic Power Station recirc pipe dose rates with zinc injection and condenser replacement

    International Nuclear Information System (INIS)

    DiCello, D.C.; Odell, A.D.; Jackson, T.J.

    1995-01-01

    Peach Bottom Atomic Power Station (PBAPS) is located near the town of Delta, Pennsylvania, on the west bank of the Susquehanna River. It is situated approximately 20 miles south of Lancaster, Pennsylvania. The site contains two boiling water reactors of General Electric design and each rated at 3,293 megawatts thermal. The units are BWR 4s and went commercial in 1977. There is also a decommissioned high temperature gas-cooled reactor on site, Unit 1. PBAPS Unit 2 recirc pipe was replaced in 1985 and Unit 3 recirc pipes replaced in 1988 with 326 NGSS. The Unit 2 replacement pipe was electropolished, and the Unit 3 pipe was electropolished and passivated. The Unit 2 brass condenser was replaced with a Titanium condenser in the first quarter of 1991, and the Unit 3 condenser was replaced in the fourth quarter of 1991. The admiralty brass condensers were the source of natural zinc in both units. Zinc injection was initiated in Unit 2 in May 1991, and in Unit 3 in May 1992. Contact dose rate measurements were made in standard locations on the 28-inch recirc suction and discharge lines to determine the effectiveness of zinc injection and to monitor radiation build-up in the pipe. Additionally, HPGe gamma scans were performed to determine the isotopic composition of the oxide layer inside the pipe. In particular, the specific (μCi/cm 2 ) of Co-60 and Zn-65 were analyzed

  2. Peach Bottom Atomic Power Station recirc pipe dose rates with zinc injection and condenser replacement

    Energy Technology Data Exchange (ETDEWEB)

    DiCello, D.C.; Odell, A.D.; Jackson, T.J. [PECO Energy Co., Delta, PA (United States)

    1995-03-01

    Peach Bottom Atomic Power Station (PBAPS) is located near the town of Delta, Pennsylvania, on the west bank of the Susquehanna River. It is situated approximately 20 miles south of Lancaster, Pennsylvania. The site contains two boiling water reactors of General Electric design and each rated at 3,293 megawatts thermal. The units are BWR 4s and went commercial in 1977. There is also a decommissioned high temperature gas-cooled reactor on site, Unit 1. PBAPS Unit 2 recirc pipe was replaced in 1985 and Unit 3 recirc pipes replaced in 1988 with 326 NGSS. The Unit 2 replacement pipe was electropolished, and the Unit 3 pipe was electropolished and passivated. The Unit 2 brass condenser was replaced with a Titanium condenser in the first quarter of 1991, and the Unit 3 condenser was replaced in the fourth quarter of 1991. The admiralty brass condensers were the source of natural zinc in both units. Zinc injection was initiated in Unit 2 in May 1991, and in Unit 3 in May 1992. Contact dose rate measurements were made in standard locations on the 28-inch recirc suction and discharge lines to determine the effectiveness of zinc injection and to monitor radiation build-up in the pipe. Additionally, HPGe gamma scans were performed to determine the isotopic composition of the oxide layer inside the pipe. In particular, the specific ({mu}Ci/cm{sup 2}) of Co-60 and Zn-65 were analyzed.

  3. Theoretical Study on the Dynamic Behavior of Pipes Conveying Gas-Liquid Flow

    Directory of Open Access Journals (Sweden)

    Enrique Ortiz-Vidal L.

    2018-01-01

    Full Text Available The dynamic behavior of clamped-clamped straight pipes conveying gas-liquid two-phase flow is theoretically investigated, specifically the effect of the flow parameters on the frequency of the system. First, the equation of motion is derived based on the classic Païdoussis formulation. Assuming Euler-Bernoulli beam theory, small-deflection approximation and no-slip homogeneous model, a coupled fluid-structure fourth-order partial differential equation (PDE is obtained. Then, the equation of motion is rendered dimensionless and discretized through Galerkin’s method. That method transforms the PDE into a set of Ordinary Differential Equations (ODEs. The system frequency is obtained by solving the system of ODEs by allowing the determinant to be equal to zero. System frequencies for different geometries, structural properties and flow conditions have been calculated. The results show that the system frequency decreases with increasing two-phase flow velocity. By contrast, the former increases with increasing homogeneous void fraction. These theoretical results are in agreement with experimental findings reported in the literature. Furthermore, even for typical two phase flow conditions, the system can become unstable for inadequate chooses of geometry or material of the pipe.

  4. Full-signature real-time corrosion detection of underground casing pipes

    NARCIS (Netherlands)

    Yin, Jiming; Lu, Mi; Pineda de Gyvez, J.

    2000-01-01

    Corrosion monitoring and early detection of pits and wall thinning for casing pipes are considerably important to gas and petroleum industries since the frequently occurring corrosion at the internal or external parts of those steel casing pipes used in underground gas storage or oil fields causes

  5. Performance evaluation of buried pipe installation.

    Science.gov (United States)

    2010-05-01

    The purpose of this study is to determine the effects of geometric and mechanical parameters characterizing the soil structure interaction developed in a buried pipe installation located under roads/highways. The drainage pipes or culverts installed ...

  6. Operation and management of United Central Piping LPG supply stations in Shenzhen

    Energy Technology Data Exchange (ETDEWEB)

    Lai Yankai

    1997-11-01

    Shenzhen has based its city gas development project on the eventual conversion to natural gas supply by way of central piping LPG supply stations. To fully exploit the potential gas supply capability of every central piping station and cut down the total running cost, we have been connecting the existing supply stations and their piping system into a network, which not only provided a more reliable gas supply performance, but can greatly simplify the evacuation of gas stations from the ever-expanding downtown areas to suburbs. Through this way, the periodic gas stock held by individual stations can be transferred to storage terminal or stations of enough holding capability; the supplying distance has been much lengthened and the gas volume held in the piping system increased; gas supply covered by small stations has been shifted to new and large stations. By linking these stations, we are able to provide pipeline LP gas supply for a large area, and in the same time lay down the pipeline infrastructure for the upcoming LNG supply so that an easy conversion to LNG supply can be secured as soon as the projected LNG terminal is put to service. (au)

  7. Oil and Gas Field Locations, Geographic NAD83, LDNR (2007) [oil_gas_fields_LDNR_2007

    Data.gov (United States)

    Louisiana Geographic Information Center — This GIS layer consists of oil and gas field approximate center point locations (approximately 1,800). Oil and gas fields not assigned a center point by the DNR...

  8. On the whistling of corrugated pipes with narrow cavities

    NARCIS (Netherlands)

    Golliard, J.; Belfroid, S.P.C.; González Diez, N.; Bendiksen, E.; Frimodt, C.

    2013-01-01

    Pipes with a corrugated inner surface, as used inflexible pipes for gas production and transport, can be subject to Flow-Induced Pulsations when the flow velocities are higher than a certain onset velocity. The onset velocity for classical corrugated pipes can be predicted on basis of the geometry

  9. Internal combustion engine exhaust pipe flow simulation. Part I: theoretical aspects

    OpenAIRE

    Juan Miguel Mantilla; Camilo Andrés Falla; Jorge Arturo Gómez

    2010-01-01

    Unsteady gas flow theory can be used for simulating a spark ignition internal combustion engine’s exhaust system, using pressure waves. The method explained here is based on the discretization of interpolated spaces (called meshes) which are located throughout the whole length of the exhaust pipe, irrespective of its form or size. The most important aspects of this theory are theoretically explored, such as pressure wave movement and shock and their application to cases found in re...

  10. Internal combustion engine exhaust pipe flow simulation. Part I: theoretical aspects

    OpenAIRE

    Juan Miguel Mantilla; Camilo Andrés Falla; Jorge Arturo Gómez

    2009-01-01

    Unsteady gas flow theory can be used for simulating a spark ignition internal combustion engine’s exhaust system, using pressure waves. The method explained here is based on the discretization of interpolated spaces (called meshes) which are located throughout the whole length of the exhaust pipe, irrespective of its form or size. The most important aspects of this theory are theoretically explored, such as pressure wave movement and shock and their application to cases found in real engines’...

  11. Apparatus for measuring total flow in pipes

    International Nuclear Information System (INIS)

    Matthews, H.

    1986-01-01

    To obtain a sample representative of the total flow in a pipe over a given period a Pitot tube is located in the pipe and connected to a collector outside the pipe. The collector is pressurised to a pressure substantially equal to the static head of the flow in the pipe via a line. Liquid is discharged from a collector to a container which is vented to atmosphere. (author)

  12. Internal combustion engine exhaust pipe flow simulation. Part I: theoretical aspects

    Directory of Open Access Journals (Sweden)

    Juan Miguel Mantilla

    2009-01-01

    Full Text Available Unsteady gas flow theory can be used for simulating a spark ignition internal combustion engine’s exhaust system, using pressure waves. The method explained here is based on the discretization of interpolated spaces (called meshes which are located throughout the whole length of the exhaust pipe, irrespective of its form or size. The most important aspects of this theory are theoretically explored, such as pressure wave movement and shock and their application to cases found in real engines’ exhaust pipes. This work also considers how the simulation must be made, based on the previous exploration. The results (presented as e- quations in this first paper show the great influence exerted by pressure wave movement on flow through the engine and there- fore on its final performance.

  13. Study on air ingress during an early stage of a primary-pipe rupture accident of a high-temperature gas-cooled reactor

    International Nuclear Information System (INIS)

    Hishida, M.; Takeda, T.

    1991-01-01

    A primary-pipe rupture accident is one of the design-based accidents of the HTTR. As the first step of our final goal of predicting the multicomponent gas flow in a reactor during the early stages of the accident, the present paper aims at studying experimentally and analytically, the basic features of air ingress and gas transportation by transient molecular diffusion and the transient natural convection of a two-component gas mixture. The present paper comprises two main parts. The first part deals with analytical and experimental studies on N 2 ingress (corresponding to air ingress) and gas transportation by molecular diffusion and the one-dimensional natural convection of an He-N 2 two-component gas mixture in a reverse-U-shaped tube. Analytical and experimental results are discussed on the N 2 mole fraction change with time after the simulated pipe rupture and on the initation time of the natural circulation of pure N 2 . The second part deals with a preliminary simulation test of air ingress during the early stages of the accident. The test is performed with a very simple model of the reactor. The experimental results are discussed on the change in mole fraction of air with time and on the initiation time of the natural circulation of pure air. (orig.)

  14. Diffusion in flexible pipes

    Energy Technology Data Exchange (ETDEWEB)

    Brogaard Kristensen, S

    2000-06-01

    This report describes the work done on modelling and simulation of the complex diffusion of gas through the wall of a flexible pipe. The diffusion and thus the pressure in annulus depends strongly on the diffusion and solubility parameters of the gas-polymer system and on the degree of blocking of the outer surface of the inner liner due to pressure reinforcements. The report evaluates the basis modelling required to describe the complex geometries and flow patterns. Qualitatively results of temperature and concentration profiles are shown in the report. For the program to serve any modelling purpose in 'real life' the results need to be validated and possibly the model needs corrections. Hopefully, a full-scale test of a flexible pipe will provide the required temperatures and pressures in annulus to validate the models. (EHS)

  15. Real-time exhaust gas modular flowmeter and emissions reporting system for mobile apparatus

    Science.gov (United States)

    Breton, Leo Alphonse Gerard (Inventor)

    2002-01-01

    A real-time emissions reporting system includes an instrument module adapted to be detachably connected to the exhaust pipe of a combustion engine to provide for flow of exhaust gas therethrough. The instrument module includes a differential pressure probe which allows for determination of flow rate of the exhaust gas and a gas sampling tube for continuously feeding a sample of the exhaust gas to a gas analyzer or a mounting location for a non-sampling gas analyzer. In addition to the module, the emissions reporting system also includes an elastomeric boot for detachably connecting the module to the exhaust pipe of the combustion engine, a gas analyzer for receiving and analyzing gases sampled within the module and a computer for calculating pollutant mass flow rates based on concentrations detected by the gas analyzer and the detected flowrate of the exhaust gas. The system may also include a particulate matter detector with a second gas sampling tube feeding same mounted within the instrument module.

  16. PE 100 pipe systems

    CERN Document Server

    Brömstrup, Heiner

    2012-01-01

    English translation of the 3rd edition ""Rohrsysteme aus PE 100"". Because of the considerably increased performance, pipe and pipe systems made from 100 enlarge the range of applications in the sectors of gas and water supply, sewage disposal, industrial pipeline construction and in the reconstruction and redevelopment of defective pipelines (relining). This book applies in particular to engineers, technicians and foremen working in the fields of supply, disposal and industry. Subject matters of the book are all practice-relevant questions regarding the construction, operation and maintenance

  17. Application of LBB to a nozzle-pipe interface

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Y.J.; Sohn, G.H.; Kim, Y.J. [and others

    1997-04-01

    Typical LBB (Leak-Before-Break) analysis is performed for the highest stress location for each different type of material in the high energy pipe line. In most cases, the highest stress occurs at the nozzle and pipe interface location at the terminal end. The standard finite element analysis approach to calculate J-Integral values at the crack tip utilizes symmetry conditions when modeling near the nozzle as well as away from the nozzle region to minimize the model size and simplify the calculation of J-integral values at the crack tip. A factor of two is typically applied to the J-integral value to account for symmetric conditions. This simplified analysis can lead to conservative results especially for small diameter pipes where the asymmetry of the nozzle-pipe interface is ignored. The stiffness of the residual piping system and non-symmetries of geometry along with different material for the nozzle, safe end and pipe are usually omitted in current LBB methodology. In this paper, the effects of non-symmetries due to geometry and material at the pipe-nozzle interface are presented. Various LBB analyses are performed for a small diameter piping system to evaluate the effect a nozzle has on the J-integral calculation, crack opening area and crack stability. In addition, material differences between the nozzle and pipe are evaluated. Comparison is made between a pipe model and a nozzle-pipe interface model, and a LBB PED (Piping Evaluation Diagram) curve is developed to summarize the results for use by piping designers.

  18. Analysis of pipe stress using CAESAR II code

    International Nuclear Information System (INIS)

    Sitandung, Y.B.; Bandriyana, B.

    2002-01-01

    Analysis of this piping stress with the purpose of knowing stress distribution piping system in order to determine pipe supports configuration. As an example of analysis, Gas Exchanger to Warm Separator Line was chosen with, input data was firstly prepared in a document, i.e. piping analysis specification that its content named as pipe characteristics, material properties, operation conditions, guide equipment's and so on. Analysis result such as stress, load, displacement and the use support type were verified based on requirements in the code, standard, and regularities were suitable with piping system condition analyzed. As the proof that piping system is in safety condition, it can be indicated from analysis results (actual loads) which still under allowable load. From the analysis steps that have been done CAESAR II code fulfill requirements to be used as a tool of piping stress analysis as well as nuclear and non nuclear installation piping system

  19. Rupture of a high pressure gas or steam pipe in a tunnel: a preliminary investigation of the jet thrust exerted on a tunnel barrier

    International Nuclear Information System (INIS)

    Baum, M.R.

    1988-04-01

    On power plant, if a high pressure pipe containing high temperature gas or steam were to rupture, sensitive equipment necessary for safety shutdown of the plant could possibly be incapacitated if exposed to the subsequent high temperature environment. In many plant configurations the high pressure pipework is contained in tunnels where it is possible to construct barriers which isolate one section of the plant from another, thereby restricting the spread of the high temperature fluid/air mixture. This paper describes a preliminary experimental investigation of the magnitude of the thrust likely to be exerted on such barriers by a gas jet issuing from the failed pipe. Measurements of the thrust exerted on a flat plate by normal impingement of a highly underexpanded gas jet are in agreement with a semi-quantitative analysis assuming conservation of the axial momentum of the jet. (author)

  20. Diffusion in flexible pipes

    Energy Technology Data Exchange (ETDEWEB)

    Brogaard Kristensen, S.

    2000-06-01

    This report describes the work done on modelling and simulation of the complex diffusion of gas through the wall of a flexible pipe. The diffusion and thus the pressure in annulus depends strongly on the diffusion and solubility parameters of the gas-polymer system and on the degree of blocking of the outer surface of the inner liner due to pressure reinforcements. The report evaluates the basis modelling required to describe the complex geometries and flow patterns. Qualitatively results of temperature and concentration profiles are shown in the report. For the program to serve any modelling purpose in 'real life' the results need to be validated and possibly the model needs corrections. Hopefully, a full-scale test of a flexible pipe will provide the required temperatures and pressures in annulus to validate the models. (EHS)

  1. Mechatronics Design of an Autonomous Pipe-Inspection Robot

    Directory of Open Access Journals (Sweden)

    Abdellatif Mohamed

    2018-01-01

    Full Text Available Pipelines require periodical inspection to detect corrosion, deformation and congestion with obstacles in the network. Autonomous mobile robots are good solutions for this task. Visual information from the pipe interior associated with a location stamp is needed for inspection. In this paper, the previous designs of autonomous robots are reviewed and a new robot is developed to ensure simple design and smooth motion. Images are processed online to detect irregularity in pipe and then start capturing high resolution pictures to conserve the limited memory size. The new robot moves in pipes and provides video stream of pipe interior with location stamp. The visual information can later be processed offline to extract more information of pipeline condition to make maintenance decisions.

  2. Design of a cavity heat pipe receiver experiment

    Science.gov (United States)

    Schneider, Michael G.; Brege, Mark H.; Greenlee, William J.

    1992-01-01

    A cavity heat pipe experiment has been designed to test the critical issues involved with incorporating thermal energy storage canisters into a heat pipe. The experiment is a replication of the operation of a heat receiver for a Brayton solar dynamic power cycle. The heat receiver is composed of a cylindrical receptor surface and an annular heat pipe with thermal energy storage canisters and gaseous working fluid heat exchanger tubes surrounding it. Hardware for the cavity heat pipe experiment will consist of a sector of the heat pipe, complete with gas tube and thermal energy storage canisters. Thermal cycling tests will be performed on the heat pipe sector to simulate the normal energy charge/discharge cycle of the receiver in a spacecraft application.

  3. The conservatism of the net-section stress procedure for predicting the failure of cracked piping systems: The effect of crack location on the degree of conservatism

    International Nuclear Information System (INIS)

    Smith, E.

    1993-01-01

    Interest in the integrity of cracked piping systems fabricated from ductile materials has been motivated, in large part, by the technological problem of intergranular stress corrosion cracking of Type 304 stainless steel piping in boiling water nuclear reactor piping systems. The failure of cracked steel piping is often predicted by assuming that failure conforms to a net-section stress criterion using as input an appropriate value for the critical net-section stress together with a knowledge of the anticipated loadings. The stresses at the cracked section are usually calculated via a purely elastic analysis based on the piping being uncracked. However because the piping is built-in at the ends into a larger component, and since the onset of crack extension requires some plastic deformation, use of the net-section stress approach can give overly conservative failure predictions. An earlier paper has quantified the extent of this conservatism, and has shown how it depends on the material ductility and the elastic flexibility of a piping system. Using the results of analyses for simple model systems, the present paper shows that, for the same cracked section geometry, the degree of conservatism is markedly influenced by the location of the cracked section within the system

  4. Poultry farming buildings. Natural gas heating. Guidebook of installation rules; Batiments d`elevage avicole. Chauffage au gaz. Guide des regles d`installation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    The technical and economical performances of a poultry farm are greatly influenced by the mastery of ambient temperature during the first days of husbandry. The natural gas space heating installation must answer these requirements and also respect all safety rules concerning the personnel and the animals. In order to answer the questions of poultry farming professionals, the technical association of the natural gas industry (ATG) in France and the Groupama insurance company have redefined the new version of this brochure which integrates the recent technological advances and defines the minimum quality and safety rules required to achieve a natural gas heating installation. The different topics presented are: the gas supply (aerial fixed reservoirs), the general distribution panel (location, command systems, regulation systems for LPG installations, electrical equipments), the distribution pipes (general supply, indoor pipes, flexible pipes, pipe fittings), the heating systems (power, choice, power supply, fastening, air renewal), the check and sign and the start-up of the installation, the periodical control and maintenance operations. (J.S.)

  5. Influence of the pipe diameter on the structure of the gas-liquid interface in a vertical two-phase pipe flow

    International Nuclear Information System (INIS)

    Prasser, H. M.; Beyer, M.; Boettger, A.; Carl, H.; Lucas, D.; Schaffrath, A.; Schutz, P.; Weiss, F. P.; Zschau, J.

    2003-01-01

    Two-phase flow tests in a 194.1 mm diameter vertical pipe (DN200) with an air-water mixture are reported. Close to the upper end of a 9 m tall test section a wire-mesh sensor is installed that delivers instantaneous void fraction distributions over the entire cross section with time resolution of 2500 frames per second. The sensor disposes of 64 x 64 measuring points, which corresponds to a spatial resolution of 3 mm. Beside an fast flow visualisations, void-fraction profiles and bubble size distributions were obtained. Earlier, similar experiments were carried out in a pipe of 51.2 mm inner diameter (DN50). A comparison of the data from the two different facilities allows to study the scaling effects on void fraction profiles, bubbles size distributions and the flow patterns. In the small pipe, the increase of the air flow rate leads to a transition from bubbly via slug to churn turbulent flow. The transition to slug flow is accompanied by the appearance of a second peak in the bubble size distribution that corresponds to the class of large Taylor bubbles. A similar qualitative behaviour was found in the large pipe, though the large bubble fraction has a significantly bigger mean diameter at identical superficial velocities, the peak is less tall but wider. Bubbles move more freely than in the small pipe, since the confining action of the pipe walls to the flow is less pronounced, while the large Taylor bubbles occupy almost the entire cross section in case of the small pipe. Furthermore, the bubbles show much more deformations in the large pipe. Shapes of such large bubbles were characterised in three dimensions for the first time. They can rather be complicated and far from the shape of ideal Taylor bubbles. Also the small bubble fraction tends to bigger sizes in the large pipe

  6. 1998 Annual Study Report. Standardization of methods for evaluating characteristics of high-strength, large-diameter steel pipes for superhigh-pressure natural gas pipelines; 1998 nendo seika hokokusho. Chokoatsu tennen gas pipeline yo kokyodo daikei kokan no tokusei hoho no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The pipelines for safely transmitting superhigh-pressure natural gas should have excellent characteristics. The steel pipe is required to have a sufficient toughness, more concretely Charpy impact-absorbing energy, to prevent propagating shear fracture characteristic of natural gas pipelines. Recently, the natural gas pipeline is increasingly required to have higher design pressures (15 Mpa or higher) and grade (X80 or higher). In order to develop the techniques for simulating crack propagation in the propagating shear fracture of natural gas pipe lines as part of the programs to cope with these trends, the 1998 efforts were directed to reviewing the research results obtained so far and analysis of the problems to be solved and tasks to be taken, based on which the analytical procedure for gas releasing phenomena during the fracture process was basically developed, the material characteristic data were collected by the laboratory scale toughness tests, and the preliminary tests with rupture disks were conducted to verify the above analytical procedure. These efforts have established the bases for evaluating the characteristics of high-strength, large-diameter steel pipes in the light of safety against fracture, and greatly advanced the program towards the final target of developing the international specification drafts for toughness. (NEDO)

  7. Burnable gas concentration control device

    International Nuclear Information System (INIS)

    Goto, Hiroshi; Sanada, Takahiro; Kuboniwa, Takao.

    1980-01-01

    Purpose: To provide connecting ports by doubling nitrogen gas injection pipes thereby to secure lengthiness of the device only by providing one nitrogen gas generator. Constitution: Nitrogen gas injection pipes are provided in two lines separately, and attachable and detachable connecting ports for feeding nitrogen gas connectable to a movable type nitrogen gas supply installation for the purpose of backing up the nitrogen gas generator. (Yoshihara, H.)

  8. 75 FR 39680 - Houston Pipe Line Company LP, Worsham-Steed Gas Storage, L.P., Energy Transfer Fuel, LP, Mid...

    Science.gov (United States)

    2010-07-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR10-44-000; Docket No. PR10-46-000; Docket No. PR10-48- 000; Docket No. PR10-49-000; Docket No. PR10-50-000] Houston Pipe Line Company LP, Worsham-Steed Gas Storage, L.P., Energy Transfer Fuel, LP, Mid Continent Market Center, L.L.C...

  9. A thermal study of pipes with outer transverse fins

    Directory of Open Access Journals (Sweden)

    S. Gil

    2016-10-01

    Full Text Available This paper provides results of thermal investigations on pipes with outer transverse fins produced by placing a strip, being a form of helical spring which functions as a radiator, on the basis pipe. The investigations were carried out at the facility that enables measurements with respect to both natural and forced convection. Performance of the investigated pipes was assessed in relation to a non-finned pipe and a pipe welded with the use of Metal Active Gas (MAG technology. The experiments have shown that the finned pipe welding technology does not markedly affect their thermal efficiency, which has been confirmed by performed model calculations, while the welding technology has a crucial impact on their operating performance.

  10. Effect of Gas Fueling Location on H-mode Access in NSTX

    International Nuclear Information System (INIS)

    Maingi, R.; Bell, M.; Bell, R.; Biewer, T.; Bush, C.; Chang, C.S.; Gates, D.; Kaye, S.; Kugel, H.; LeBlanc, B.; Maqueda, R.; Menard, J.; Mueller, D.; Raman, R.; Sabbagh, S.; Soukhanovskii, V.

    2003-01-01

    The dependence of H-mode access on the poloidal location of the gas injection source has been investigated in the National Spherical Torus Experiment (NSTX). We find that gas fueling from the center stack midplane area produces the most reproducible H-mode access with generally the lowest L-H threshold power in lower single-null configuration. The edge toroidal rotation velocity is largest (in direction of the plasma current) just before the L-H transition with center stack midplane fueling, and then reverses direction after the L-H transition. Simulation of these results with a 2-D guiding-center Monte Carlo neoclassical transport code is qualitatively consistent with the trends in the measured velocities. Double-null discharges exhibit H-mode access with gas fueling from either the center stack midplane or center stack top locations, indicating a reduced sensitivity of H-mode access on fueling location in that shape

  11. Three-phase flow (water, oil and gas in a vertical circular cylindrical duct with leaks: A theoretical study

    Directory of Open Access Journals (Sweden)

    W Santos

    2016-10-01

    Full Text Available This article describes the fluid dynamic behavior of a three-phase flow (water-oil-natural gas in a vertical pipe with or without leakage. The studied pipe has 8 meters in length, circular cross-section with 25 cm in diameter and a leak, which hole has a circular shape with 10mm diameter located in the center of pipe. The conservation equations of mass, momentum and energy for each phase (continuous phase - oil, dispersed phases - gas and water were numerically solved using ANSYS CFX software, in which the Eulerian-Eulerian model and the RNG - turbulence model were applied. Results of the pressure, velocity, temperature and volume fraction distributions of the involved phases are present and analyzed.

  12. Functional capability of piping systems

    International Nuclear Information System (INIS)

    Terao, D.; Rodabaugh, E.C.

    1992-11-01

    General Design Criterion I of Appendix A to Part 50 of Title 10 of the Code of Federal Regulations requires, in part, that structures, systems, and components important to safety be designed to withstand the effects of earthquakes without a loss of capability to perform their safety function. ne function of a piping system is to convey fluids from one location to another. The functional capability of a piping system might be lost if, for example, the cross-sectional flow area of the pipe were deformed to such an extent that the required flow through the pipe would be restricted. The objective of this report is to examine the present rules in the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section III, and potential changes to these rules, to determine if they are adequate for ensuring the functional capability of safety-related piping systems in nuclear power plants

  13. The construction of a microstrip gas tracker for Hermes

    International Nuclear Information System (INIS)

    Brand, J. van den

    1994-01-01

    To measure the spin structure of the nucleon, the HERMES experiment is planned at the HERA electron beam using a polarised internal gas target. A tracker is being built to reconstruct the vertex of the exciting particles. It consists of two drift chambers and two microstrip gas counter (MSGC) systems. The MSGC systems are housed into two gas gatight containers surrounding the beam pipe and located immediately after the exit flange of the target housing. The active area of the upper MSGC system covers an angular range of 40 mrad≤θ v ≤ 140 mrad by -170 mrad≤θ h ≤170 mrad. Below the beam pipe a second system is situated with the same acceptance. Each track within the acceptance is measured by two stations of three MSCGs having a strip orientation, of 0 , and +30 and -30 respectively with respect to the vertical axis. (HSI)

  14. Optimum design for pipe-support allocation against seismic loading

    International Nuclear Information System (INIS)

    Hara, Fumio; Iwasaki, Akira

    1996-01-01

    This paper deals with the optimum design methodology of a piping system subjected to a seismic design loading to reduce its dynamic response by selecting the location of pipe supports and whereby reducing the number of pipe supports to be used. The author employs the Genetic Algorithm for obtaining a reasonably optimum solution of the pipe support location, support capacity and number of supports. The design condition specified by the support location, support capacity and the number of supports to be used is encored by an integer number string for each of the support allocation candidates and they prepare many strings for expressing various kinds of pipe-support allocation state. Corresponding to each string, the authors evaluate the seismic response of the piping system to the design seismic excitation and apply the Genetic Algorithm to select the next generation candidates of support allocation to improve the seismic design performance specified by a weighted linear combination of seismic response magnitude, support capacity and the number of supports needed. Continuing this selection process, they find a reasonably optimum solution to the seismic design problem. They examine the feasibility of this optimum design method by investigating the optimum solution for 5, 7 and 10 degree-of-freedom models of piping system, and find that this method can offer one a theoretically feasible solution to the problem. They will be, thus, liberated from the severe uncertainty of damping value when the pipe support guaranties the design capacity of damping. Finally, they discuss the usefulness of the Genetic Algorithm for the seismic design problem of piping systems and some sensitive points when it will be applied to actual design problems

  15. Integrating a Procurement Management Process into Critical Chain Project Management (CCPM: A Case-Study on Oil and Gas Projects, the Piping Process

    Directory of Open Access Journals (Sweden)

    Sung-Hwan Jo

    2018-05-01

    Full Text Available Engineering, Procurement, and Construction (EPC of oil and gas megaprojects often experience cost overruns due to substantial schedule delays. One of the greatest causes of these overruns is the mismanagement of the project schedule, with the piping works (prefabrication and installation occupying a majority of that schedule. As such, an effective methodology for scheduling, planning, and controlling of piping activities is essential for project success. To meet this need, this study used the Critical Chain Project Management (CCPM to develop a piping construction delay prevention methodology, incorporating material procurement processes for EPC megaprojects. Recent studies indicate that the traditional scheduling method used on oil and gas mega projects has critical limitations regarding resource scarcity, calculation of activity duration, and dealing with uncertainties. To overcome these limitations, the Theory of Constraints-based CCPM was proposed and implemented to provide schedule buffers management. Nonexistent in literature, and of critical importance, is this paper’s focus on the resource buffer, representing material uncertainty and management. Furthermore, this paper presents a step-by-step process and flow chart for project, construction, and material managers to effectively manage a resource buffer through the CCPM process. This study extends the knowledge of traditional resource buffers in CCPM to improve material and procurement management, thus avoiding the shortage of piping materials and minimizing delays. The resultant process was validated by both deterministic and probabilistic schedule analysis through two case studies of a crude pump unit and propylene compressor installation at a Middle Eastern Refinery Plant Installation. The results show that the CCPM method effectively handles uncertainty, reducing the duration of piping works construction by about a 35% when compared to the traditional method. Furthermore, the

  16. The spatial distribution of pollutants in pipe-scale of large-diameter pipelines in a drinking water distribution system.

    Science.gov (United States)

    Liu, Jingqing; Chen, Huanyu; Yao, Lingdan; Wei, Zongyuan; Lou, Liping; Shan, Yonggui; Endalkachew, Sahle-Demessie; Mallikarjuna, Nadagouda; Hu, Baolan; Zhou, Xiaoyan

    2016-11-05

    In large-diameter drinking water pipelines, spatial differences in hydraulic and physiochemical conditions may also result in spatial variations in pipe corrosion, biofilm growth and pollutant accumulation. In this article, the spatial distributions of various metals and organic contaminants in two 19-year-old grey cast iron pipes which had an internal diameter of 600mm (DN600), were investigated and analyzed by Atomic Absorption Spectrometry, Gas Chromatography-Mass Spectrometry, Energy Dispersive Spectrometer, X-ray Diffraction, etc. The spatial distribution of heavy metals varied significantly across the pipe section, and iron, manganese, lead, copper, and chromium were highest in concentration in the upper portion pipe-scales. However, the highest aluminum and zinc content was detected in the lower portion pipe-scales. Apart from some common types of hydrocarbons formed by microbial metabolites, there were also some microalgae metabolites and exogenous contaminants accumulated in pipe-scale, which also exhibited high diversity between different spatial locations. The spatial distributions of the physical and chemical properties of pipe-scale and contaminants were quite different in large-diameter pipes. The finding put forward higher requirements on the research method about drinking water distribution system chemical safety. And the scientific community need understand trend and dynamics of drinking water pipe systems better. Copyright © 2016 Elsevier B.V. All rights reserved.

  17. High temperature heat pipe experiments in low earth orbit

    International Nuclear Information System (INIS)

    Woloshun, K.; Merrigan, M.A.; Sena, J.T.; Critchley, E.

    1993-01-01

    Although high temperature, liquid metal heat pipe radiators have become a standard component on most high power space power system designs, there is no experimental data on the operation of these heat pipes in a zero gravity or micro-gravity environment. Experiments to benchmark the transient and steady state performance of prototypical heat pipe space radiator elements are in preparation for testing in low earth orbit. It is anticipated that these heat pipes will be tested aborad the Space Shuttle in 1995. Three heat pipes will be tested in a cargo bay Get Away Special (GAS) canister. The heat pipes are SST/potassium, each with a different wick structure; homogeneous, arterial, and annular gap, the heat pipes have been designed, fabricated, and ground tested. In this paper, the heat pipe designs are specified, and transient and steady-state ground test data are presented

  18. Method and device for characterization of two-phase flow in pipes

    International Nuclear Information System (INIS)

    Skarsvaag, K.; Sunde, A.J.

    1993-01-01

    Gamma radiation transmission measurements are made with one-shot-collimation to determine the distribution of voids within a gas-liquid mixture flowing in a pipe. The distribution of voids in selected portions of the pipe, taken together with statistical and logical tests applied thereto, provides information from which are determined: type of flow pattern or flow regime, the profile of a large gas bubble in slug flow, and the gas and the liquid volume flow rates in slug flow. 4 refs

  19. Frictional pressure drop of gas liquid two-phase flow in pipes

    International Nuclear Information System (INIS)

    Shannak, Benbella A.

    2008-01-01

    Experiments of air water two-phase flow frictional pressure drop of vertical and horizontal smooth and relatively rough pipes were conducted, respectively. The result demonstrated that the frictional pressure drop increases with increasing relative roughness of the pipe. However, the influence of the relative roughness becomes more evident at higher vapour quality and higher mass flux. A new prediction model for frictional pressure drop of two-phase flow in pipes is proposed. The model includes a new definition of the Reynolds number and the friction factor of two-phase flow. The proposed model fits the presented experimental data very well, for vertical, horizontal, smooth and rough pipes. Therefore, the reproductive accuracy of the model is tested on the experimental data existing in the open literature and compared with the most common models. The statistical comparison, based on the Friedel's Data-Bank containing of about 16,000 measured data, demonstrated that the proposed model is the best overall agreement with the data. The model was tested for a wide range of flow types, fluid systems, physical properties and geometrical parameters, typically encountered in industrial piping systems. Hence, calculating based on the new approach is sufficiently accurate for engineering purposes

  20. Flow induced vibrations of piping system (Vibration sources - Mechanical response of the pipes)

    International Nuclear Information System (INIS)

    Gibert, R.J.; Axisa, F.; Villard, B.

    1978-01-01

    In order to design the supports of piping system, an estimation of the vibration induced by the fluid conveyed through the pipes are generally needed. For that purpose it is necessary. To evaluate the power spectra of all the main sources generated by the flow. These sources are located at the singular points of the circuit (enlargements, bends, valves, etc. ...). To calculate the modal parameters of fluid containing pipes. This paper presents: a methodical study of the most current singularities. Inter-correlation spectra of local pressure fluctuation downstream from the singularity and correlation spectra of associated acoustical sources have been measured. A theory of noise generation by unsteady flow in internal acoustics has been developed. All these results are very useful for evaluating the source characteristics in most practical pipes. A comparison between the calculation and the results of an experimental test has shown a good agreement

  1. Efficient simulation of flow and heat transfer in arbitrarily shaped pipes

    OpenAIRE

    Rosen Esquivel, P.I.

    2012-01-01

    The transport of fluids through pipes is a very common application. Corrugated pipes have characteristics such as local stiffness and flexibility that makes them convenient in several application areas such as offshore LNG (Liquefied Natural Gas) transfer, cryogenic engineering, domestic appliances, etc. Nonetheless, the introduction of pipes with corrugated walls increases the difficulty of simulating flow and heat transfer in these type of pipes. The present thesis addresses the development...

  2. Pipes's distribution by helicopter in Amazonian forest

    Energy Technology Data Exchange (ETDEWEB)

    Barbosa, Gilberto R.; Machado, Otto L.M.; Gomes, Antonio E. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-12-19

    The innumerable logistical problems encountered during the implementation of the gas pipeline Urucu - Coari - Manaus, located in the Amazon forest, connecting the Base Operations Geologist Pedro de Moura in Urucu to the refinery Isaac Sabba - Reman, in the city of Manaus, contributed considerably for PETROBRAS to seek non conventional solutions in the construction and assembly of pipelines in our country. Among these solutions, there is the technique of distributing pipes through cargo helicopters. The need for the usage of this technique, innovative in Brazil, comes from the lack and/or insufficiency of land access from Solimoes River to the gas pipeline main route, and the large quantities of flooded areas and/or flood plain, and also the type of soil, that together with the high index of rainfall in the region, makes the soil fully inappropriate to the traffic of heavy equipment. (author)

  3. 30 CFR 75.1905-1 - Diesel fuel piping systems.

    Science.gov (United States)

    2010-07-01

    ... facility. (g) Diesel fuel piping systems from the surface shall only be used to transport diesel fuel... storage facility. (h) The diesel fuel piping system must not be located in a borehole with electric power... entry as electric cables or power lines. Where it is necessary for piping systems to cross electric...

  4. Resolution of thermal striping issue downstream of a horizontal pipe elbow in stratified pipe flow

    International Nuclear Information System (INIS)

    Kuzay, T.M.; Kasza, K.E.

    1985-01-01

    A thermally stratified pipe flow produced by a thermal transient when passing through a horizontal elbow as a result of secondary flow gives rise to large thermal fluctuations on the inner curvature wall of the downstream piping. These fluctuations were measured in a specially instrumented horizontal pipe and elbow system on a test set-up using water in the Mixing Components Technology Facility (MCTF) at Argonne National Laboratory (ANL). This study is part of a larger program which is studying the influence of thermal buoyancy on general reactor component performance. This paper discusses the influence of pipe flow generated thermal oscillations on the thermal stresses induced in the pipe walls. The instrumentation was concentrated around the exit plane of the 90 0 sweep elbow, since prior tests had indicated that the largest thermal fluctuations would occur within about one hydraulic diameter downstream of the elbow exit. The thermocouples were located along the inner curvature of the piping and measured the near surface fluid temperature. The test matrix involved thermal downramps under turbulent flow conditions

  5. Laser-GMA Hybrid Pipe Welding System

    National Research Council Canada - National Science Library

    Reutzel, Edward W; Kern, Ludwig; Sullivan, Michael J; Tressler, Jay F; Avalos, Juan

    2007-01-01

    The combination of laser welding with conventional gas metal arc welding technology offers substantial increases in production rate of joining pipe through single-pass joining compared to multi-pass...

  6. Research overview of real-time monitoring system for micro leak of three-dimensional pipe network

    Directory of Open Access Journals (Sweden)

    Shaofeng WANG

    2016-04-01

    Full Text Available Aiming at the key technical problems encountered by domestic and foreign scholars in building the real-time monitoring system for the micro leak of three-dimensional pipe networks, the paper classifies the problems into three aspects: 1 in the extraction of fault signal frequency, how to avoid the effect of the mixed echo stack and improve the delay estimation accuracy of the correlation; 2 in network bifurcation structure, how to discern the signal propagation path, and how to locate the leak source; 3 under the uncertainly delay in transmitting and receiving information data, how to ensure the time synchronization accuracy of the real-time monitoring system for the three-dimensional pipe network leakage. Through the comparison of the monitoring technologies for the pipe network leakage at home and abroad, it shows that the acoustic emission sensor network based three-dimensional pipeline leak real-time monitoring has great advantages in detecting the weak leakage of flammable and explosive gas/liquid transportation pipelines.

  7. The Slug and Churn Turbulence Characteristics of Oil-Gas-Water Flows in a Vertical Small Pipe

    Science.gov (United States)

    Liu, Weixin; Han, Yunfeng; Wang, Dayang; Zhao, An; Jin, Ningde

    2017-08-01

    The intention of the present study was to investigate the slug and churn turbulence characteristics of a vertical upward oil-gas-water three-phase flow. We firstly carried out a vertical upward oil-gas-water three-phase flow experiment in a 20-mm inner diameter (ID) pipe to measure the fluctuating signals of a rotating electric field conductance sensor under different flow patterns. Afterwards, typical flow patterns were identified with the aid of the texture structures in a cross recurrence plot. Recurrence quantitative analysis and multi-scale cross entropy (MSCE) algorithms were applied to investigate the turbulence characteristics of slug and churn flows with the varying flow parameters. The results suggest that with cross nonlinear analysis, the underlying dynamic characteristics in the evolution from slug to churn flow can be well understood. The present study provides a novel perspective for the analysis of the spatial-temporal evolution instability and complexity in oil-gas-water three-phase flow.

  8. Valve for the mechanical isolation of a pipe to take up a test probe

    International Nuclear Information System (INIS)

    Uecker, D.F.

    1976-01-01

    A valve is introduced for application in a pipe in which a test probe is arranged. The valve serves to isolate the pipe in a gas-tight way, thus preventing the escape of radioactive gas or dust during operation in a nuclear reactor. (TK) [de

  9. Development of Innovating Materials for Distributing Mixtures of Hydrogen and Natural Gas. Study of the Barrier Properties and Durability of Polymer Pipes

    Directory of Open Access Journals (Sweden)

    Klopffer Marie-Hélène

    2015-02-01

    Full Text Available With the growing place taken by hydrogen, a question still remains about its delivery and transport from the production site to the end user by employing the existing extensive natural gas pipelines. Indeed, the key challenge is the significant H2 permeation through polymer infrastructures (PolyEthylene (PE pipes, components such as connecting parts. This high flow rate of H2 through PE has to be taken into account for safety and economic requirements. A 3-year project was launched, the aim of which was to develop and assess material solutions to cope with present problems for hydrogen gas distribution and to sustain higher pressure compared to classical high density polyethylene pipe. This project investigated pure hydrogen gas and mixtures with natural gas (20% of CH4 and 80% of H2 in pipelines with the aim to select engineering polymers which are more innovative than polyethylene and show outstanding properties, in terms of permeation, basic mechanical tests but also more specific characterizations such as long term ageing and behaviour. The adequate benches, equipments and scientific approach for materials testing had been developed and validated. In this context, the paper will focus on the evaluation of the barrier properties of 3 polymers (PE, PA11 and PAHM. Experiments were performed for pure H2 and CH4 and also in the presence of mixtures of hydrogen and natural gas in order to study the possible mixing effects of gases. It will report some round-robin tests that have been carried out. Secondly, by comparing data obtained on film, polymer membrane and on pipe section, the influence of the polymer processing will be studied. Innovative multilayers systems will be proposed and compared on the basis of the results obtained on monolayer systems. Finally, the evolution of the transport properties of the studied polymers with an ageing under representative service conditions will be discussed.

  10. Investigation on field method using strain measurement on pipe surface to measure pressure pulsation in piping systems

    International Nuclear Information System (INIS)

    Maekawa, Akira; Tsuji, Takashi; Takahashi, Tsuneo; Kato, Minoru

    2013-01-01

    Accurate evaluation of the occurrence location and amplitude of pressure pulsations in piping systems can lead to efficient plant maintenance by preventing fatigue failure of piping and components because the pulsations can be one of the main causes of vibration fatigue and acoustic noise in piping. A non-destructive field method to measure pressure pulsations easily and directly was proposed to replace conventional methods such as prediction using numerical simulations and estimation using locally installed pressure gauges. The proposed method was validated experimentally by measuring pulsating flow in a mock-up piping system. As a result, it was demonstrated that the method to combine strain measurement on the outer surface of pipe with the formula for thick-walled cylinders could measure amplitudes and behavior of the pressure pulsations with a practical accuracy. Factors affecting the measurement accuracy of the proposed method were also discussed. Furthermore, the applicability of the formula for thin-walled cylinders was examined for variously shaped pipes. (author)

  11. 24 CFR 3280.705 - Gas piping systems.

    Science.gov (United States)

    2010-04-01

    ... upstream of the connection. (3) The connection(s) may be made by a listed quick disconnect device which... separated. (4) The flexible connector, direct plumbing pipe, or “quick disconnect” device shall be provided... disconnect device is installed, a 3 inch by 13/4 inch minimum size tag made of etched, metal-stamped or...

  12. Resolution of thermal striping issue downstream of a horizontal pipe elbow in stratified pipe flow. [LMFBR

    Energy Technology Data Exchange (ETDEWEB)

    Kuzay, T.M.; Kasza, K.E.

    1985-01-01

    A thermally stratified pipe flow produced by a thermal transient when passing through a horizontal elbow as a result of secondary flow gives rise to large thermal fluctuations on the inner curvature wall of the downstream piping. These fluctuations were measured in a specially instrumented horizontal pipe and elbow system on a test set-up using water in the Mixing Components Technology Facility (MCTF) at Argonne National Laboratory (ANL). This study is part of a larger program which is studying the influence of thermal buoyancy on general reactor component performance. This paper discusses the influence of pipe flow generated thermal oscillations on the thermal stresses induced in the pipe walls. The instrumentation was concentrated around the exit plane of the 90/sup 0/ sweep elbow, since prior tests had indicated that the largest thermal fluctuations would occur within about one hydraulic diameter downstream of the elbow exit. The thermocouples were located along the inner curvature of the piping and measured the near surface fluid temperature. The test matrix involved thermal downramps under turbulent flow conditions.

  13. Design of megawatt power level heat pipe reactors

    Energy Technology Data Exchange (ETDEWEB)

    Mcclure, Patrick Ray [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Poston, David Irvin [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Dasari, Venkateswara Rao [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Reid, Robert Stowers [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-11-12

    An important niche for nuclear energy is the need for power at remote locations removed from a reliable electrical grid. Nuclear energy has potential applications at strategic defense locations, theaters of battle, remote communities, and emergency locations. With proper safeguards, a 1 to 10-MWe (megawatt electric) mobile reactor system could provide robust, self-contained, and long-term power in any environment. Heat pipe-cooled fast-spectrum nuclear reactors have been identified as a candidate for these applications. Heat pipe reactors, using alkali metal heat pipes, are perfectly suited for mobile applications because their nature is inherently simpler, smaller, and more reliable than “traditional” reactors. The goal of this project was to develop a scalable conceptual design for a compact reactor and to identify scaling issues for compact heat pipe cooled reactors in general. Toward this goal two detailed concepts were developed, the first concept with more conventional materials and a power of about 2 MWe and a the second concept with less conventional materials and a power level of about 5 MWe. A series of more qualitative advanced designs were developed (with less detail) that show power levels can be pushed to approximately 30 MWe.

  14. Development, manufacturing and testing of a gas-loaded variable conductance methanol heat pipe

    Science.gov (United States)

    Vanbuggenum, R. I. J.; Daniels, D. H. W.

    1987-02-01

    The experimental technology required to measure the performance of moderate temperature heat pipes is presented. The heat pipe manufacturing process is described. The hydrodynamic characteristics of the porous structure inside the heat pipe envelope were examined using a specially developed test rig, based upon a steady-state evaporation test. A fully automated test facility was developed and validated by testing constant conductance and variable conductance heat pipes (VCHP). Theoretical performance predictions are illustrated in terms of pressure, depicted in 3D-plots, and compared with the test results of the heat pipe performance tests. The design of the VCHP was directed towards the verification of the VCHP mathematical model. The VCHP design is validated and ready for the final testing and model verification.

  15. The behavior, quantity, and location of undissolved gas in Tank 241-SY-101

    Energy Technology Data Exchange (ETDEWEB)

    Brewster, M.E.; Gallagher, N.B.; Hudson, J.D.; Stewart, C.W.

    1995-10-01

    Mitigation of episodic flammable gas releases from Hanford Waste Tank 241-SY-101 was accomplished in July 1993 with the installation of a mixer pump that prevents gas retention. But is has not been possible until recently to measure the effects of mixing on the waste or how much gas remains and where it is located. Direct measurements of the void fraction and rheology of the mixed waste by the void fraction instrument (VFI) and ball rheometer along with previous data provide estimates of the location, quantity, and behavior of undissolved gas in the tank. This report documents the compilation and integration of the information that enables this understanding.

  16. Failure rate of piping in hydrogen sulphide systems

    International Nuclear Information System (INIS)

    Hare, M.G.

    1993-08-01

    The objective of this study is to provide information about piping failures in hydrogen sulphide service that could be used to establish failures rates for piping in 'sour service'. Information obtained from the open literature, various petrochemical industries and the Bruce Heavy Water Plant (BHWP) was used to quantify the failure analysis data. On the basis of this background information, conclusions from the study and recommendations for measures that could reduce the frequency of failures for piping systems at heavy water plants are presented. In general, BHWP staff should continue carrying out their present integrity and leak detection programmes. The failure rate used in the safety studies for the BHWP appears to be based on the rupture statistics for pipelines carrying sweet natural gas. The failure rate should be based on the rupture rate for sour gas lines, adjusted for the unique conditions at Bruce

  17. Development of two-phase flow along a large vertical pipe

    International Nuclear Information System (INIS)

    Dirk Lucas; Prasser, H.M.

    2005-01-01

    Full text of publication follows: To qualify CFD codes for two-phase flow simulations, closure laws describing the interaction between the phases are needed. Vertical pipe flow is a suitable object for studying the corresponding phenomena in case of dispersed bubbly flow. Here, the bubbles move under clear boundary conditions, resulting in a shear field of nearly constant structure where the bubbles rise for a comparatively long time. This allows to study the lateral motion of the bubbles in a shear flow as well as bubble coalescence and break-up by comparing gas volume fraction distributions and bubble size distributions at different heights. Very detailed data were obtained at the TOPFLOW facility of the Forschungszentrum Rossendorf using an advanced wire-mesh sensor. This sensor measures the instantaneous conductivity distribution over the pipe cross section. The high frequency of the measurement (2500 frames/s) allows the detection of single bubbles by a special evaluation procedure. Bubble size distributions, gas volume fraction distributions and also gas fraction distributions decomposed according to the bubble size are delivered as result of the evaluation procedure. The use of two sensors allows to measure the profile of the gas velocity. In previous works similar data for pipe of 51.2 mm inner diameter were used for the validation of non-drag bubble forces [1] and the evaluation of the influence of radial profiles on the development of the flow pattern [2]. First investigations on scaling effects were done using data obtained at a pipe with an inner diameter of 194 mm [3]. A constant distance between gas injection and measuring plane of L/D ∼ 40 was used. From a new test series now measurements are available for varying distances between the injection device and the wire-mesh sensor. This allows the evaluation of the development of the flow along the pipe. The data are used for the development and validation of mesoscale models for the forces acting on

  18. Mathematical models for two-phase stratified pipe flow

    Energy Technology Data Exchange (ETDEWEB)

    Biberg, Dag

    2005-06-01

    The simultaneous transport of oil, gas and water in a single multiphase flow pipe line has for economical and practical reasons become common practice in the gas and oil fields operated by the oil industry. The optimal design and safe operation of these pipe lines require reliable estimates of liquid inventory, pressure drop and flow regime. Computer simulations of multiphase pipe flow have thus become an important design tool for field developments. Computer simulations yielding on-line monitoring and look ahead predictions are invaluable in day-to-day field management. Inaccurate predictions may have large consequences. The accuracy and reliability of multiphase pipe flow models are thus important issues. Simulating events in large pipelines or pipeline systems is relatively computer intensive. Pipe-lines carrying e.g. gas and liquefied gas (condensate) may cover distances of several hundred km in which transient phenomena may go on for months. The evaluation times associated with contemporary 3-D CFD models are thus not compatible with field applications. Multiphase flow lines are therefore normally simulated using specially dedicated 1-D models. The closure relations of multiphase pipe flow models are mainly based on lab data. The maximum pipe inner diameter, pressure and temperature in a multiphase pipe flow lab is limited to approximately 0.3 m, 90 bar and 60{sup o}C respectively. The corresponding field values are, however, much higher i.e.: 1 m, 1000 bar and 200{sup o}C respectively. Lab data does thus not cover the actual field conditions. Field predictions are consequently frequently based on model extrapolation. Applying field data or establishing more advanced labs will not solve this problem. It is in fact not practically possible to acquire sufficient data to cover all aspects of multiphase pipe flow. The parameter range involved is simply too large. Liquid levels and pressure drop in three-phase flow are e.g. determined by 13 dimensionless parameters

  19. Microcomputer generated pipe support calculations

    International Nuclear Information System (INIS)

    Hankinson, R.F.; Czarnowski, P.; Roemer, R.E.

    1991-01-01

    The cost and complexity of pipe support design has been a continuing challenge to the construction and modification of commercial nuclear facilities. Typically, pipe support design or qualification projects have required large numbers of engineers centrally located with access to mainframe computer facilities. Much engineering time has been spent repetitively performing a sequence of tasks to address complex design criteria and consolidating the results of calculations into documentation packages in accordance with strict quality requirements. The continuing challenges of cost and quality, the need for support engineering services at operating plant sites, and the substantial recent advances in microcomputer systems suggested that a stand-alone microcomputer pipe support calculation generator was feasible and had become a necessity for providing cost-effective and high quality pipe support engineering services to the industry. This paper outlines the preparation for, and the development of, an integrated pipe support design/evaluation software system which maintains all computer programs in the same environment, minimizes manual performance of standard or repetitive tasks, and generates a high quality calculation which is consistent and easily followed

  20. MORPHOTECTONIC ANALYSIS AT TANIMBAR TRENCH AS A BASE FOR GAS PIPE LAYING BETWEEN MASELA BLOCK AND SELARU ISLAND, MOLUCCAS PROVINCE

    Directory of Open Access Journals (Sweden)

    Ediar Usman

    2017-07-01

    Full Text Available The study area is located at Masela Block and its surrounding, Moluccas Province. Result of the deep sea measurement and global data conversion provide description of three dimensions around the track lines area. This result is overlay with seismic data, that can give morphotectonic implication between Asian and Australian Plates. Track lines of MGI-2010-MSL-1, 2 and 3 show that the profile of the sea floor, form the high morphology which represents the volcanic islands. It forms west – east direction of fold-thrust belt non-volcanic outer Banda arc. The southern part trench of the Australian Continent reflected the platform system and undulation morphology. The sea floor profile ( VE 1:5 show that the slope profile ranges between 0º and 8º. Furthermore, the morphology of the sea floor can be classified as a relatively flat slope. Due to this condition, this area may be used for gas pipe laying along 146 km distance, between the Well of Abadi 1 at the Masela Block and Selaru Island at south Tanimbar Islands.

  1. The spatial distribution of pollutants in pipe-scale of large-diameter pipelines in a drinking water distribution system

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Jingqing [College of Engineering and Architecture, Zhejiang University, Hangzhou 310058 (China); Chen, Huanyu [College of Environmental and Resource Sciences, Zhejiang University, Hangzhou 310058 (China); Binhai Industrial Technology Research Institute of Zhejiang University, Tianjin 300000 (China); Yao, Lingdan; Wei, Zongyuan [College of Environmental and Resource Sciences, Zhejiang University, Hangzhou 310058 (China); Lou, Liping, E-mail: loulp@zju.edu.cn [College of Environmental and Resource Sciences, Zhejiang University, Hangzhou 310058 (China); Shan, Yonggui; Endalkachew, Sahle-Demessie; Mallikarjuna, Nadagouda [Environmental Protection Agency, Office of Research and Development, NRMRL, Cincinnati, OH 45220 (United States); Hu, Baolan [College of Environmental and Resource Sciences, Zhejiang University, Hangzhou 310058 (China); Zhou, Xiaoyan [Shaoxing Water Environmental Science Institute Co. Ltd, Zhejiang 312000 (China)

    2016-11-05

    Highlights: • First investigating the spatial distribution of pollutants in pipe-scale. • Spatial distribution of heavy metals indicated their sources were different. • Three main factors effete the distribution of pollutants. • Organic deposits mainly included microbial and microalgae metabolites. - Abstract: In large-diameter drinking water pipelines, spatial differences in hydraulic and physiochemical conditions may also result in spatial variations in pipe corrosion, biofilm growth and pollutant accumulation. In this article, the spatial distributions of various metals and organic contaminants in two 19-year-old grey cast iron pipes which had an internal diameter of 600 mm (DN600), were investigated and analyzed by Atomic Absorption Spectrometry, Gas Chromatography–Mass Spectrometry, Energy Dispersive Spectrometer, X-ray Diffraction, etc. The spatial distribution of heavy metals varied significantly across the pipe section, and iron, manganese, lead, copper, and chromium were highest in concentration in the upper portion pipe-scales. However, the highest aluminum and zinc content was detected in the lower portion pipe-scales. Apart from some common types of hydrocarbons formed by microbial metabolites, there were also some microalgae metabolites and exogenous contaminants accumulated in pipe-scale, which also exhibited high diversity between different spatial locations. The spatial distributions of the physical and chemical properties of pipe-scale and contaminants were quite different in large-diameter pipes. The finding put forward higher requirements on the research method about drinking water distribution system chemical safety. And the scientific community need understand trend and dynamics of drinking water pipe systems better.

  2. The spatial distribution of pollutants in pipe-scale of large-diameter pipelines in a drinking water distribution system

    International Nuclear Information System (INIS)

    Liu, Jingqing; Chen, Huanyu; Yao, Lingdan; Wei, Zongyuan; Lou, Liping; Shan, Yonggui; Endalkachew, Sahle-Demessie; Mallikarjuna, Nadagouda; Hu, Baolan; Zhou, Xiaoyan

    2016-01-01

    Highlights: • First investigating the spatial distribution of pollutants in pipe-scale. • Spatial distribution of heavy metals indicated their sources were different. • Three main factors effete the distribution of pollutants. • Organic deposits mainly included microbial and microalgae metabolites. - Abstract: In large-diameter drinking water pipelines, spatial differences in hydraulic and physiochemical conditions may also result in spatial variations in pipe corrosion, biofilm growth and pollutant accumulation. In this article, the spatial distributions of various metals and organic contaminants in two 19-year-old grey cast iron pipes which had an internal diameter of 600 mm (DN600), were investigated and analyzed by Atomic Absorption Spectrometry, Gas Chromatography–Mass Spectrometry, Energy Dispersive Spectrometer, X-ray Diffraction, etc. The spatial distribution of heavy metals varied significantly across the pipe section, and iron, manganese, lead, copper, and chromium were highest in concentration in the upper portion pipe-scales. However, the highest aluminum and zinc content was detected in the lower portion pipe-scales. Apart from some common types of hydrocarbons formed by microbial metabolites, there were also some microalgae metabolites and exogenous contaminants accumulated in pipe-scale, which also exhibited high diversity between different spatial locations. The spatial distributions of the physical and chemical properties of pipe-scale and contaminants were quite different in large-diameter pipes. The finding put forward higher requirements on the research method about drinking water distribution system chemical safety. And the scientific community need understand trend and dynamics of drinking water pipe systems better.

  3. Efficient simulation of flow and heat transfer in arbitrarily shaped pipes

    NARCIS (Netherlands)

    Rosen Esquivel, P.I.

    2012-01-01

    The transport of fluids through pipes is a very common application. Corrugated pipes have characteristics such as local stiffness and flexibility that makes them convenient in several application areas such as offshore LNG (Liquefied Natural Gas) transfer, cryogenic engineering, domestic appliances,

  4. Identifying and mitigating flow-induced vibration in recycle loop gas piping at a centrifugal compressor station

    Energy Technology Data Exchange (ETDEWEB)

    Broerman, Eugene L.; Gatewood, Jason T.; O' Grady, James T. [Southwest Research Institute, San Antonio, TX (United States); Troy, Russell F. [Spectra Energy, Houston, TX (United States); Rand, Charles L.; Stroud, Gary T. [R-S-H Engineering, Monroe, LA (United States)

    2010-07-01

    The South East Supply Header joining Delhi, Louisiana, to Coden, Alabama, was put into service in 2008. During start-up of the mainline compressor station, located near Lucedale, MS, high amplitude vibration was detected on the second elbow downstream of the anti-surge valve/fast stop valve piping tee in the recycle loop piping. The aim of this paper is to present the issue and the solution adopted. An investigation of the high vibration was carried out and was followed by Strouhal and acoustic analyses. A solution to the problem was then proposed and mechanically analyzed. It was found that upfront analyses of these types can give an accurate prediction of the vibration and could have avoided the problem encountered and saved a lot of time and money since the modification costs were about 10 times higher than those for a typical analysis made at the installation design phase would have been.

  5. LOCATING LEAKS WITH ACOUSTIC TECHNOLOGY

    Science.gov (United States)

    Many water distribution systems in this country are almost 100 years old. About 26 percent of piping in these systems is made of unlined cast iron or steel and is in poor condition. Many methods that locate leaks in these pipes are time-consuming, costly, disruptive to operations...

  6. Field test of hydrogen in the natural gas grid

    Energy Technology Data Exchange (ETDEWEB)

    Iskov, H

    2010-08-15

    In order to prepare for a future use of hydrogen as a fuel gas it became evident that very little information existed regarding the compatibility between long-term exposure and transportation of hydrogen in natural gas pipelines. A program was therefore set to study the transportation in a small-scale pilot grid at the research centre in Hoersholm, Denmark. The test program included steel pipes from the Danish gas transmission grid and polymer pipes from the Danish and Swedish gas distribution grid. The test of polymer pipes was devised so that samples of all test pipes were cut out of the grid each year and analysis performed on these pipe samples; in this way any form of influence on the integrity of the polyethylene pipe would be detected. The analytical program for polymer was devised in order to detect any influence on the additivation of the polyethylene as this has an influence on oxidative resistance, as well as checking already encountered possible degradation caused by extrusion of the material. Further tools as rheology and melt flow rate were used for detecting any structural changes on the material. On the mechanical property side the tensile strength and modulus were followed as well as the most important property for the pipe line, namely slow crack growth. The results of the polymer pipe tests show no degradations of any kind related to the continuous hydrogen exposure for more than 4 years. This is a strong indication of the compatibility to hydrogen of the tested polymer materials PE 80 and PE 100. The object of the steel pipe test was to see the effect on fatigue life of existing natural gas transmission lines with hydrogen replacing the natural gas. Full-scale dynamic tests were performed using randomly selected cut-out API 5L X70 pipe sections with a diameter of 20 inches and a wall thickness of 7 millimetres from the Danish natural gas transmission system. The pipe sections contained field girth weld made during the installation of the pipe

  7. Field test of hydrogen in the natural gas grid

    Energy Technology Data Exchange (ETDEWEB)

    Iskov, H.

    2010-08-15

    In order to prepare for a future use of hydrogen as a fuel gas it became evident that very little information existed regarding the compatibility between long-term exposure and transportation of hydrogen in natural gas pipelines. A program was therefore set to study the transportation in a small-scale pilot grid at the research centre in Hoersholm, Denmark. The test program included steel pipes from the Danish gas transmission grid and polymer pipes from the Danish and Swedish gas distribution grid. The test of polymer pipes was devised so that samples of all test pipes were cut out of the grid each year and analysis performed on these pipe samples; in this way any form of influence on the integrity of the polyethylene pipe would be detected. The analytical program for polymer was devised in order to detect any influence on the additivation of the polyethylene as this has an influence on oxidative resistance, as well as checking already encountered possible degradation caused by extrusion of the material. Further tools as rheology and melt flow rate were used for detecting any structural changes on the material. On the mechanical property side the tensile strength and modulus were followed as well as the most important property for the pipe line, namely slow crack growth. The results of the polymer pipe tests show no degradations of any kind related to the continuous hydrogen exposure for more than 4 years. This is a strong indication of the compatibility to hydrogen of the tested polymer materials PE 80 and PE 100. The object of the steel pipe test was to see the effect on fatigue life of existing natural gas transmission lines with hydrogen replacing the natural gas. Full-scale dynamic tests were performed using randomly selected cut-out API 5L X70 pipe sections with a diameter of 20 inches and a wall thickness of 7 millimetres from the Danish natural gas transmission system. The pipe sections contained field girth weld made during the installation of the pipe

  8. Development of a Remote External Repair Tool for Damaged or Defective Polyethylene Pipe

    Energy Technology Data Exchange (ETDEWEB)

    Kenneth H. Green; Willie E. Rochefort; Nick Wannenmacher; John A. Clark; Kevin Harris

    2006-06-30

    Current procedures for repairing polyethylene (PE) gas pipe require excavation, isolation, and removal of the damaged section of pipe followed by fusing a new section of pipe into place. These techniques are costly and very disruptive. An alternative repair method was developed at Timberline Tool with support from Oregon State University (OSU) and funding by the U. S. Department of Energy National Energy Technology Laboratory (DOE/NETL). This project was undertaken to design, develop and test a tool and method for repairing damaged PE pipe remotely and externally in situ without squeezing off the flow of gas, eliminating the need for large-scale excavations. Through an iterative design and development approach, a final engineered prototype was developed that utilizes a unique thermo-chemical and mechanical process to apply a permanent external patch to repair small nicks, gouges and punctures under line pressure. The project identified several technical challenges during the design and development process. The repair tool must be capable of being installed under live conditions and operate in an 18-inch keyhole. This would eliminate the need for extensive excavations thus reducing the cost of the repair. Initially, the tool must be able to control the leak by encapsulating the pipe and apply slight pressure at the site of damage. Finally, the repair method must be permanent at typical operating pressures. The overall results of the project have established a permanent external repair method for use on damaged PE gas pipe in a safe and cost-effective manner. The engineered prototype was subjected to comprehensive testing and evaluation to validate the performance. Using the new repair tool, samples of 4-inch PE pipe with simulated damage were successfully repaired under line pressure to the satisfaction of DOE/NETL and the following natural gas companies: Northwest Natural; Sempra Energy, Southwest Gas Corporation, Questar, and Nicor. However, initial results of

  9. Nondestructive testing during the fabrication of pressure vessels with half pipe jackets

    International Nuclear Information System (INIS)

    Scherner, D.

    1985-01-01

    The most important precondition to guarantee the optimum quality of half pipe jackets is the precise fixing and observance of the manufacturing conditions. For this reason the manufacturing conditions are explained in detail. The second important point is the test for gas tightness of the half pipe jacket system. The sources of mistakes in connection with the test for gas tightness are of fundamental importance. (orig./PW) [de

  10. Localization of leaks in underground pipes with the application of radioactive isotopes

    International Nuclear Information System (INIS)

    Klupa, A.; Morawiec, J.

    1983-01-01

    A method of leaks localization on gas pipe-lines during resistance and tightness tests was elaborated. The leaks were localized using tracer technique. Sodium 24 was used as a tracer for short sections of the pipe-line (up to 30 km). Only 1 m 3 of water with a tracer was introduced into the pipe-line. A measuring probe was also put into pipe-line. All leaks were detected and the method appeared useful. For the longer sections of the pipe-line iodine 131 ought to be used. (A.S.)

  11. Submarine slope failures due to pipe structure formation.

    Science.gov (United States)

    Elger, Judith; Berndt, Christian; Rüpke, Lars; Krastel, Sebastian; Gross, Felix; Geissler, Wolfram H

    2018-02-19

    There is a strong spatial correlation between submarine slope failures and the occurrence of gas hydrates. This has been attributed to the dynamic nature of gas hydrate systems and the potential reduction of slope stability due to bottom water warming or sea level drop. However, 30 years of research into this process found no solid supporting evidence. Here we present new reflection seismic data from the Arctic Ocean and numerical modelling results supporting a different link between hydrates and slope stability. Hydrates reduce sediment permeability and cause build-up of overpressure at the base of the gas hydrate stability zone. Resulting hydro-fracturing forms pipe structures as pathways for overpressured fluids to migrate upward. Where these pipe structures reach shallow permeable beds, this overpressure transfers laterally and destabilises the slope. This process reconciles the spatial correlation of submarine landslides and gas hydrate, and it is independent of environmental change and water depth.

  12. Simulation of temperature-pressure profiles and wax deposition in gas-lift wells

    Directory of Open Access Journals (Sweden)

    Sevic Snezana

    2017-01-01

    Full Text Available Gas-lift is an artificial lift method in which gas is injected down the tubing- -casing annulus and enters the production tubing through the gas-lift valves to reduce the hydrostatic pressure of the formation fluid column. The gas changes pressure, temperature and fluid composition profiles throughout the production tubing string. Temperature and pressure drop along with the fluid composition changes throughout the tubing string can lead to wax, asphaltenes and inorganic salts deposition, increased emulsion stability and hydrate formation. This paper presents a new model that can sucesfully simulate temperature and pressure profiles and fluid composition changes in oil well that operates by means of gas-lift. This new model includes a pipe-in-pipe segment (production tubing inside production casing, countercurrent flow of gas-lift gas and producing fluid, heat exchange between gas-lift gas and the surrounding ambient – ground; and gas-lift gas with the fluid in the tubing. The model enables a better understanding of the multiphase fluid flow up the production tubing. Model was used to get insight into severity and locations of wax deposition. The obtained information on wax deposition can be used to plan the frequency and depth of wax removing operations. Model was developed using Aspen HYSYS software.

  13. Reliability-based assessment of polyethylene pipe creep lifetime

    International Nuclear Information System (INIS)

    Khelif, Rabia; Chateauneuf, Alaa; Chaoui, Kamel

    2007-01-01

    Lifetime management of underground pipelines is mandatory for safe hydrocarbon transmission and distribution systems. The use of high-density polyethylene tubes subjected to internal pressure, external loading and environmental variations requires a reliability study in order to define the service limits and the optimal operating conditions. In service, the time-dependent phenomena, especially creep, take place during the pipe lifetime, leading to significant strength reduction. In this work, the reliability-based assessment of pipe lifetime models is carried out, in order to propose a probabilistic methodology for lifetime model selection and to determine the pipe safety levels as well as the most important parameters for pipeline reliability. This study is enhanced by parametric analysis on pipe configuration, gas pressure and operating temperature

  14. Reliability-based assessment of polyethylene pipe creep lifetime

    Energy Technology Data Exchange (ETDEWEB)

    Khelif, Rabia [LaMI-UBP and IFMA, Campus de Clermont-Fd, Les Cezeaux, BP 265, 63175 Aubiere Cedex (France); LR3MI, Departement de Genie Mecanique, Universite Badji Mokhtar, BP 12, Annaba 23000 (Algeria)], E-mail: rabia.khelif@ifma.fr; Chateauneuf, Alaa [LGC-University Blaise Pascal, Campus des Cezeaux, BP 206, 63174 Aubiere Cedex (France)], E-mail: alaa.chateauneuf@polytech.univ-bpclermont.fr; Chaoui, Kamel [LR3MI, Departement de Genie Mecanique, Universite Badji Mokhtar, BP 12, Annaba 23000 (Algeria)], E-mail: chaoui@univ-annaba.org

    2007-12-15

    Lifetime management of underground pipelines is mandatory for safe hydrocarbon transmission and distribution systems. The use of high-density polyethylene tubes subjected to internal pressure, external loading and environmental variations requires a reliability study in order to define the service limits and the optimal operating conditions. In service, the time-dependent phenomena, especially creep, take place during the pipe lifetime, leading to significant strength reduction. In this work, the reliability-based assessment of pipe lifetime models is carried out, in order to propose a probabilistic methodology for lifetime model selection and to determine the pipe safety levels as well as the most important parameters for pipeline reliability. This study is enhanced by parametric analysis on pipe configuration, gas pressure and operating temperature.

  15. Gas dynamic design of the pipe line compressor with 90% efficiency. Model test approval

    Science.gov (United States)

    Galerkin, Y.; Rekstin, A.; Soldatova, K.

    2015-08-01

    Gas dynamic design of the pipe line compressor 32 MW was made for PAO SMPO (Sumy, Ukraine). The technical specification requires compressor efficiency of 90%. The customer offered favorable scheme - single-stage design with console impeller and axial inlet. The authors used the standard optimization methodology of 2D impellers. The original methodology of internal scroll profiling was used to minimize efficiency losses. Radically improved 5th version of the Universal modeling method computer programs was used for precise calculation of expected performances. The customer fulfilled model tests in a 1:2 scale. Tests confirmed the calculated parameters at the design point (maximum efficiency of 90%) and in the whole range of flow rates. As far as the authors know none of compressors have achieved such efficiency. The principles and methods of gas-dynamic design are presented below. The data of the 32 MW compressor presented by the customer in their report at the 16th International Compressor conference (September 2014, Saint- Petersburg) and later transferred to the authors.

  16. SEALING LARGE-DIAMETER CAST-IRON PIPE JOINTS UNDER LIVE CONDITIONS

    Energy Technology Data Exchange (ETDEWEB)

    Kiran M. Kothari; Gerard T. Pittard

    2005-04-01

    Utilities in the U.S. operate over 75,000 km (47,000 miles) of old cast-iron pipes for gas distribution. The bell-and-spigot joints that connect pipe sections together tend to leak as these pipes age. Current repair practices are costly and highly disruptive. The objective of this program is to design, test and commercialize a robotic system capable of sealing multiple cast-iron bell and spigot joints from a single pipe entry point. The proposed system will perform repairs while the pipe remains in service by traveling through the pipe, cleaning each joint surface, and installing a stainless-steel sleeve lined with an epoxy-impregnated felt across the joint. This approach will save considerable time and labor, avoid traffic disruption, and eliminate any requirement to interrupt service to customers (which would result in enormous expense to utilities). Technical challenges include: (1) repair sleeves must compensate for diametric variation and eccentricity of old cast-iron pipes; (2) the assembly must travel long distances through pipes containing debris; (3) the pipe wall must be effectively cleaned in the immediate area of the joint to assure good bonding of the sleeve; and (4) an innovative bolt-on entry fitting is required to conduct repair operations on live mains. The development effort is divided into eleven tasks. Task 1 (Program Management) and Task 2 (Establishment of Detailed Design Specifications) were completed previously. Task 3 (Design and Fabricate Ratcheting Stainless-Steel Repair Sleeves) has progressed to installing prototype sleeves in test cast-iron pipe segments. Efforts in the current quarter continued to be focused on Tasks 4-8. Highly valuable lessons were learned from field tests of the 4-inch gas pipe repair robot in cast-iron pipe at Public Service Electric & Gas. (These field tests were conducted and reported previously.) Several design issues were identified which need to be implemented in both the small- and large-diameter repair

  17. Studies on the characteristics of the separated type heat pipe system with non-condensible gas for the use of the passive decay heat removal in reactor systems

    International Nuclear Information System (INIS)

    Hayashi, Takao; Iigaki, Kazuhiko; Ohashi, Kazutaka; Hayakawa, Hitoshi; Yamada, Masao.

    1995-01-01

    This study is the fundamental research by experiments to aim at the development of the complete passive decay heat removal system on the modular reactor systems by the form of the separated type of heat pipe system utilizing the features of both the big latent heat for vaporization from water to steam and easy transportation characteristics. Special intention in our study on the fundamental experiments is to look for the effects in such a separated type of heat pipe system to introduce non-condensible gas such as nitrogen gas together with the working fluid of water. Many interesting findings have been obtained so far on the experiments for the variable conductance heat pipe characteristics from viewpoint of the actual application on the aim said above. This study has been carried out by the joint study between Tokai University and Fuji Electric Co., Ltd. and this paper is made up from the several papers presented so far at both the national and international symposiums under the name of joint study of the both bodies. (author)

  18. Experimental Study of Gas Explosions in Hydrogen Sulfide-Natural Gas-Air Mixtures

    Directory of Open Access Journals (Sweden)

    André Vagner Gaathaug

    2014-01-01

    Full Text Available An experimental study of turbulent combustion of hydrogen sulfide (H2S and natural gas was performed to provide reference data for verification of CFD codes and direct comparison. Hydrogen sulfide is present in most crude oil sources, and the explosion behaviour of pure H2S and mixtures with natural gas is important to address. The explosion behaviour was studied in a four-meter-long square pipe. The first two meters of the pipe had obstacles while the rest was smooth. Pressure transducers were used to measure the combustion in the pipe. The pure H2S gave slightly lower explosion pressure than pure natural gas for lean-to-stoichiometric mixtures. The rich H2S gave higher pressure than natural gas. Mixtures of H2S and natural gas were also studied and pressure spikes were observed when 5% and 10% H2S were added to natural gas and also when 5% and 10% natural gas were added to H2S. The addition of 5% H2S to natural gas resulted in higher pressure than pure H2S and pure natural gas. The 5% mixture gave much faster combustion than pure natural gas under fuel rich conditions.

  19. Oils; gas

    Energy Technology Data Exchange (ETDEWEB)

    Day, D T

    1922-09-18

    Oils and gas are obtained from shale or oil-bearing sand by immersing the shale in and passing it through a bath of liquid oil, cracking the oil-soaked shale, and condensing the vapor and using the condensate to replenish the bath, preferably by passing the gases and vapors direct into the oil-bath container. Shale is fed continuously from a hopper to a bath of oil in an inclined chamber, is carried to the outlet by a conveyer, and through cracking tubes to an outlet pipe by conveyers. The gases and vapors escape by the pipe, a part condensing in the chamber and a run-back pipe and replenishing the bath, and the remainder passing through a condensing tower and condenser connected to reservoirs; the gas is further passed through a scrubber and a pipe to the burner of the retort. The oil condensed in the chamber overflows to the reservoir through a pipe provided with an open pipe to prevent siphoning. The conveyers and a valve on the pipe are operated by gearing. The operation may be conducted at reduced, normal, or increased pressure, e.g., 70 lbs. The temperature of the retort should be about 900 to 1400/sup 0/F, that of the inside of the tubes about 550 to 700/sup 0/F, and that of the chamber about 300/sup 0/F. The chamber and pipe may be insulated or artificially cooled.

  20. Pipe and hose decontamination apparatus

    International Nuclear Information System (INIS)

    Fowler, D.E.

    1985-01-01

    A pipe and hose decontamination apparatus is disclosed using freshly filtered high pressure Freon solvent in an integrated closed loop to remove radioactive particles or other contaminants from items having a long cylindrical geometry such as hoses, pipes, cables and the like. The pipe and hose decontamination apparatus comprises a chamber capable of accomodating a long cylindrical work piece to be decontaminated. The chamber has a downward sloped bottom draining to a solvent holding tank. An entrance zone, a cleaning zone and an exit drying zone are defined within the chamber by removable partitions having slotted rubber gaskets in their centers. The entrance and exit drying zones contain a horizontally mounted cylindrical housing which supports in combination a plurality of slotted rubber gaskets and circular brushes to initiate mechanical decontamination. Solvent is delivered at high pressure to a spray ring located in the cleaning zone having a plurality of nozzles surrounding the work piece. The solvent drains into a solvent holding tank located below the nozzles and means are provided for circulating the solvent to and from a solvent cleaning, distilling and filter unit

  1. Method and means of passive detection of leaks in buried pipes

    International Nuclear Information System (INIS)

    Claytor, T.N.

    1981-01-01

    A method and means for passive detection of a leak in a buried pipe containing fluid under pressure includes a plurality of acoustic detectors that are placed in contact with the pipe. Noise produced by the leak is detected by the detectors, and the detected signals are correlated to locate the leak. In one embodiment of the invention two detectors are placed at different locations to locate a leak between them. In an alternate embodiment two detectors of different waves are placed at substantially the same location to determine the distance of the leak from the location

  2. The insitu lining of cooling water piping

    International Nuclear Information System (INIS)

    Vaughan, W.K.; Oxner, K.B.

    1994-01-01

    The internal corrosion of cooling water piping as well as other industrial piping is becoming an increasing problem to system reliability. There are various alternatives being offered as solutions to the problem including water treatment, coatings, and piping replacement. The in-place lining of these pipes is becoming increasingly popular as a cost-effective method to control corrosion. A cured-in-place plastic composite system can be installed with minimal dismantling or excavation. This paper will examine case histories of the installations of this lining system in power plants at three (3) locations in the United States and one in France. It will also summarize testing that has been performed on the lining system and tests that are currently being performed

  3. Heat transfer characteristics and operation limit of pressurized hybrid heat pipe for small modular reactors

    International Nuclear Information System (INIS)

    Kim, Kyung Mo; Bang, In Cheol

    2017-01-01

    Highlights: • Thermal performances and operation limits of hybrid heat pipe were experimentally studied. • Models for predicting the operation limit of the hybrid heat pipe was developed. • Non-condensable gas affected heat transfer characteristics of the hybrid heat pipe. - Abstract: In this paper, a hybrid heat pipe is proposed for use in advanced nuclear power plants as a passive heat transfer device. The hybrid heat pipe combines the functions of a heat pipe and a control rod to simultaneously remove the decay heat generated from the core and shutdown the reactor under accident conditions. Thus, the hybrid heat pipe contains a neutron absorber in the evaporator section, which corresponds to the core of the reactor pressure vessel. The presence of the neutron absorber material leads to differences in the heated diameter and hydraulic diameter of the heat pipe. The cross-sectional areas of the vapor paths through the evaporator, adiabatic, and condenser sections are also different. The hybrid heat pipe must operate in a high-temperature, high-pressure environment to remove the decay heat. In other words, the operating pressure must be higher than those of the commercially available thermosyphons. Hence, the thermal performances, including operation limit of the hybrid heat pipe, were experimentally studied in the operating pressure range of 0.2–20 bar. The operating pressure of the hybrid heat pipe was controlled by charging the non-condensable gas which is unused method to achieve the high saturation pressure in conventional thermosyphons. The effect of operating pressure on evaporation heat transfer was negligible, while condensation heat transfer was affected by the amount of non-condensable gas in the test section. The operation limit of the hybrid heat pipe increased with the operating pressure. Maximum heat removal capacity of the hybrid heat pipe was up to 6 kW which is meaningful value as a passive decay heat removal device in the nuclear power

  4. Evaluation of an exhaust gas evacuation system during propane-fueled lift truck maintenance

    International Nuclear Information System (INIS)

    Roberge, B.; Beaudet, Y.; Lazure, L.; Menard, L.; Turcotte, A.

    2006-01-01

    Exposure to carbon monoxide (CO) gas in the workplace can cause health problem. CO gas is colourless and odourless, and exposure to it can cause intoxication, particularly for mechanics working on internal combustion engines fed by propane-fueled lift trucks. Regular procedures for evacuating the gases emitted during routine mechanical repairs involve the use of rigid evacuating pipes attached to the building and hooked to a flexible pipe at the end of the exhaust pipe. With lift trucks, this procedure is limited because of the configuration of these vehicles, and also because this type of work is often done in places without access to permanent mechanical ventilation. The object of this study was to propose a new evacuation method for CO gas fumes that would lower the exposures of fumes for mechanics and for workstations. It identified the criteria that should be considered, such as the configuration of the existing exhaust system of lift trucks, and feasibility of using this system at a variety of on-site locations. The design of the device was described and evaluated. 7 refs., 6 tabs., 8 figs., 3 appendices

  5. Configuration analysis of pipe support for primary cooling using Ps + Caepipe code

    International Nuclear Information System (INIS)

    Sitandung, Y. B.; Pustandyo, W.; Sujalmo, S.

    1998-01-01

    Pipe stress evaluation and support loads has been analyzed on piping segment of RSG-GAS primary cooling system. This paper describes an analysis method of piping system with the use of computer Code PS + CAEPIPE Version 3.4.05.W. From the selected pipe segment, the data of pipe characteristic, material properties, operation condition, equipment and supports were used input. The final evaluation result of primary cooling pipe segment show that actual stress dead weight and seismic load are less than allowable limits (stress ratio 0.101 for deadweight 0.35 for seismic load). From the above ratio, it can be concluded that ratio of pipe support configuration to stress distribution is acceptable, and based on analysis result, the Code used by INTERATOM was sufficiently accurate

  6. Effect of wall wettability on flow characteristics of gas-liquid two-phase flow

    International Nuclear Information System (INIS)

    Uematsu, Junichi; Abe, Kazuya; Hazuku, Tatsuya; Takamasa, Tomoji; Hibiki, Takashi

    2007-01-01

    To evaluate the effect of surface wettability in pipe wall on flow characteristics in a vertical upward gas-liquid to-phase flow, visualization study was performed using three test pipes, namely an acrylic pipe, a hydrophilic pipe, a hydrophobic pipe. Such basic flow characteristics as flow patterns and void fraction were investigated in these three pipes. In the hydrophilic pipe, the slug flow-to-churn flow transition boundary was shifted to higher gas velocity condition at a given liquid velocity, whereas the churn flow-to-annular flow transition boundary was shifted to lower gas velocity condition at a given liquid velocity. In the hydrophobic pipe, the inverted-churn flow regime was observed in the region where the churn flow regime was observed in the acrylic pipe, whereas the droplet flow regime was observed in the region where the annular flow regime was observed in the acrylic pipe. At high-gas flow rate condition, the mean void fraction in the hydrophobic pipe took relatively higher value to that in the acrylic pipe. (author)

  7. Thermal expansion movements of piping during FFTF plant startup

    International Nuclear Information System (INIS)

    Lindquist, M.R.

    1981-03-01

    FFTF liquid metal piping exhibits significant displacements during heatup of the plant heat transport system. Verification of correct piping movements is important to assure that no restraints are present and to provide data for additional piping design/analysis validation. A test program is described in which a series of measurements were taken at selected piping locations. These data were obtained during Plant Acceptance Testing involving system heatup cycles to approximately 800 0 F(427 0 C). Typical test data are shown and compared to analytical predictions. Two piping system problems that were identified as a result of the testing are described along with resolutions thereof. Establishment of final baseline data is discussed

  8. Application of tearing modulus stability concepts to nuclear piping. Final report

    International Nuclear Information System (INIS)

    Cotter, K.H.; Chang, H.Y.; Zahoor, A.

    1982-02-01

    The recently developed tearing modulus stability concept was successfully applied to several boiling water reactor (BWR) and pressurized water reactor (PWR) piping systems. Circumferentially oriented through-the-thickness cracks were postulated at numerous locations in each system. For each location, the simplified tearing stability methods developed in USNRC Report NUREG/CR-0838 were used to determine crack stability. The J-T diagram was used to present the results of the computations. The piping systems considered included Type 304 stainless steel as well as A106 carbon steel materials. These systems were analyzed using the piping analysis computer code MINK

  9. An approximate analysis of the diffusing flow in a self-controlled heat pipe.

    Science.gov (United States)

    Somogyi, D.; Yen, H. H.

    1973-01-01

    Constant-density two-dimensional axisymmetric equations are presented for the diffusing flow of a class of self-controlled heat pipes. The analysis is restricted to the vapor space. Condensation of the vapor is related to its mass fraction at the wall by the gas kinetic formula. The Karman-Pohlhausen integral method is applied to obtain approximate solutions. Solutions are presented for a water heat pipe with neon control gas.

  10. Pipe-flange detection with GPR

    International Nuclear Information System (INIS)

    Bonomo, Néstor; De la Vega, Matías; Martinelli, Patricia; Osella, Ana

    2011-01-01

    This paper describes an application of the ground penetrating radar (GPR) method for detecting pipe flanges. A case history is described in which GPR was successfully used to locate pipe flanges along an 8 km metal pipeline, using a fixed-offset methodology, from the ground surface. Summaries of numerical simulations and in situ tests, performed before the definitive prospecting to evaluate the feasibility of detection, are included. Typical GPR signals are analysed and several examples shown. Constant-time sections of data volumes and migration are evaluated with the goal of distinguishing flange signals from rock signals in unclear situations. The applied methodology was effective for detecting the pipe flanges in relatively short times, with accuracies below 10 cm in the horizontal direction and 20 cm in the vertical direction

  11. Heat pipes to reduce engine exhaust emissions

    Science.gov (United States)

    Schultz, D. F. (Inventor)

    1984-01-01

    A fuel combustor is presented that consists of an elongated casing with an air inlet conduit portion at one end, and having an opposite exit end. An elongated heat pipe is mounted longitudinally in the casing and is offset from and extends alongside the combustion space. The heat pipe is in heat transmitting relationship with the air intake conduit for heating incoming air. A guide conduit structure is provided for conveying the heated air from the intake conduit into the combustion space. A fuel discharge nozzle is provided to inject fuel into the combustion space. A fuel conduit from a fuel supply source has a portion engaged in heat transfer relationship of the heat pipe for preheating the fuel. The downstream end of the heat pipe is in heat transfer relationship with the casing and is located adjacent to the downstream end of the combustion space. The offset position of the heat pipe relative to the combustion space minimizes the quenching effect of the heat pipe on the gaseous products of combustion, as well as reducing coking of the fuel on the heat pipe, thereby improving the efficiency of the combustor.

  12. Flow induced vibrations of piping

    International Nuclear Information System (INIS)

    Gibert, R.J.; Axisa, F.

    1977-01-01

    In order to design the supports of piping systems, estimations of the vibrations induced by the fluid conveyed through the pipes are generally needed. For that purpose it is necessary to calculate the model parameters of liquid containing pipes. In most computer codes, fluid effects are accounted for just by adding the fluid mass to the structure. This may lead to serious errors. This paper presents a method to take into account these effects, by solving a coupled mechanical-acoustical problem: the computer code TEDEL of the C.E.A /D.E.M.T. System, based on the finite-elements method, has been extended to calculate simultaneously the pressure fluctuations in the fluid and the vibrations of the pipe. By this way the mechanical-acoustical coupled eigenmodes of any piping system can be obtained. These eigenmodes are used to determine the response of the system to various sources. Equations have been written in the hypohesis that acoustical wave lengths remain large compared to the diameter of the pipe. The method has been checked by an experiment performed on the GASCOGNE loop at D.E.M.T. The piping system under test consists of a tube with four elbows. The circuit is ended at each extremity by a large vessel which performs acoustical isolation by generating modes for the pressure. Excitation of the circuit is caused by a valve located near the downstream vessel. This provides an efficient localised broad band acoustical source. The comparison between the test results and the calculations has shown that the low frequency resonant characteristics of the pipe and the vibrational amplitude at various flow-rates can be correctly predicted

  13. Investigation of gas-phase decontamination of internally radioactively contaminated gaseous diffusion process equipment and piping

    International Nuclear Information System (INIS)

    Bundy, R.D.; Munday, E.B.

    1991-01-01

    Construction of the gaseous diffusion plants (GDPs) was begun during World War 2 to produce enriched uranium for defense purposes. These plants, which utilized UF 6 gas, were used primarily for this purpose through 1964. From 1959 through 1968, production shifted primarily to uranium enrichment to supply the nuclear power industry. Additional UF 6 -handling facilities were built in feed and fuel-processing plants associated with the uranium enrichment process. Two of the five process buildings at Oak ridge were shut down in 1964. Uranium enrichment activities at Oak Ridge were discontinued altogether in 1985. In 1987, the Department of Energy (DOE) decided to proceed with a permanent shutdown of the Oak Ridge Gaseous Diffusion Plant (ORGDP). DOE intends to begin decommissioning and decontamination (D ampersand D) of ORGDP early in the next century. The remaining two GDPs are expected to be shut down during the next 10 to 40 years and will also require D ampersand D, as will the other UF 6 -handling facilities. This paper presents an investigation of gas- phase decontamination of internally radioactively contaminated gaseous diffusion process equipment and piping using powerful fluorinating reagents that convert nonvolatile uranium compounds to volatile UF 6 . These reagents include ClF 3 , F 2 , and other compounds. The scope of D ampersand D at the GDPs, previous work of gas-phase decontamination, four concepts for using gas-phase decontamination, plans for further study of gas-phase decontamination, and the current status of this work are discussed. 13 refs., 15 figs

  14. Analisis Tekuk Lateral Pipa Gas Bawah Laut

    Directory of Open Access Journals (Sweden)

    Fitrotul Laeli Hidayaturrohmah

    2016-08-01

    Full Text Available To prevent solidification on the pipeline, hydrocarbon is transferred in high temperature and high pressure. High presure and temperature lead to axial tension appearence along the pipeline. Interaction between soil and the surface of pipeline trigering frictional resistance which holding axial force on the pipeline and could cause the occurence of global buckling. According to DNV RP F110, global buckling may occur in several directions which one of them is in the lateral direction. Lateral buckling usually occurs only in the exposed pipe which occurs when the compressive force on the pipe imperfection released at one point so that the excess force in the slip zone turn into buckling. According to DNV RP F 110, there are three methods of analysis that can be used to perform the analysis of lateral buckling the pipe. Those are methods of Hobbs, Van GAF, and Spinazle. In this paper, lateral buckling analysis performed on a 7.67 km subsea gas pipeline by using Hobbs method which concluded that the pipeline has the potential to lateral buckling. Analysis by using software ABAQUS was also carried out to determine the location of the lateral buckling which is the location where overstressed occur.

  15. Defect occurrence, detection, location and characterization; essential variables of the LBB concept application to primary piping

    Energy Technology Data Exchange (ETDEWEB)

    Crutzen, S.; Koble, T.D.; Lemaitre, P. [and others

    1997-04-01

    Applications of the Leak Before Break (LBB) concept involve the knowledge of flaw presence and characteristics. In Service Inspection is given the responsibility of detecting flaws of a determined importance to locate them precisely and to classify them in broad families. Often LBB concepts application imply the knowledge of flaw characteristics such as through wall depth; length at the inner diameter (ID) or outer diameter (OD) surface; orientation or tilt and skew angles; branching; surface roughness; opening or width; crack tip aspect. Besides detection and characterization, LBB evaluations consider important the fact that a crack could be in the weld material or in the base material or in the heat affected zone. Cracks in tee junctions, in homogenous simple welds and in elbows are not considered in the same way. Essential variables of a flaw or defect are illustrated, and examples of flaws found in primary piping as reported by plant operators or service vendors are given. If such flaw variables are important in the applications of LBB concepts, essential is then the knowledge of the performance achievable by NDE techniques, during an ISI, in detecting such flaws, in locating them and in correctly evaluating their characteristics.

  16. TSTA piping and flame arrestor operating experience data

    Energy Technology Data Exchange (ETDEWEB)

    Cadwallader, Lee C., E-mail: Lee.Cadwallader@inl.gov [Idaho National Laboratory, Idaho Falls, ID (United States); Willms, R. Scott [ITER International Organization, Cadarache (France)

    2015-10-15

    Highlights: • Experiences from the Tritium Systems Test Assembly were examined. • Failure rates of copper piping and a flame arrestor were calculated. • The calculated failure rates compared well to similar data from the literature. • Tritium component failure rate data support fusion safety assessment. - Abstract: The Tritium Systems Test Assembly (TSTA) was a facility dedicated to tritium handling technology and experiment research at the Los Alamos National Laboratory. The facility was operated with tritium for its research and development program from 1984 to 2001, running a prototype fusion fuel processing loop with ∼100 g of tritium as well as small experiments. There have been several operating experience reports written on this facility's operation and maintenance experience. This paper describes reliability analysis of two additional components from TSTA, small diameter copper gas piping that handled tritium in a nitrogen carrier gas, and the flame arrestor used in this piping system. The component failure rates for these components are discussed in this paper. Comparison data from other applications are also presented.

  17. Calculating the Optimum Angle of Filament-Wound Pipes in Natural Gas Transmission Pipelines Using Approximation Methods.

    Science.gov (United States)

    Reza Khoshravan Azar, Mohammad; Emami Satellou, Ali Akbar; Shishesaz, Mohammad; Salavati, Bahram

    2013-04-01

    Given the increasing use of composite materials in various industries, oil and gas industry also requires that more attention should be paid to these materials. Furthermore, due to variation in choice of materials, the materials needed for the mechanical strength, resistance in critical situations such as fire, costs and other priorities of the analysis carried out on them and the most optimal for achieving certain goals, are introduced. In this study, we will try to introduce appropriate choice for use in the natural gas transmission composite pipelines. Following a 4-layered filament-wound (FW) composite pipe will consider an offer our analyses under internal pressure. The analyses' results will be calculated for different combinations of angles 15 deg, 30 deg, 45 deg, 55 deg, 60 deg, 75 deg, and 80 deg. Finally, we will compare the calculated values and the optimal angle will be gained by using the Approximation methods. It is explained that this layering is as the symmetrical.

  18. Feedback regarding leaks in pipe work

    International Nuclear Information System (INIS)

    Guerville, C.; Boudouin, E.

    2011-01-01

    Contaminated effluent from nuclear medicine departments is stored in decay tanks before being discharged via the sewage system. Generally speaking, these tanks are located outside hospital wards, within the hospital's maintenance rooms. Pipes leading from the evacuation points (e.g. toilets in isolation wards) to the tanks may nonetheless pass through various other parts of the hospital premises (wards, corridors, offices, etc.). Should a leak occur in any of these pipes, this may impact on the public, workers or the environment. (author)

  19. TSTA Piping and Flame Arrestor Operating Experience Data

    Energy Technology Data Exchange (ETDEWEB)

    Cadwallader, Lee C.; Willms, R. Scott

    2014-10-01

    The Tritium Systems Test Assembly (TSTA) was a facility dedicated to tritium handling technology and experiment research at the Los Alamos National Laboratory. The facility operated from 1984 to 2001, running a prototype fusion fuel processing loop with ~100 grams of tritium as well as small experiments. There have been several operating experience reports written on this facility’s operation and maintenance experience. This paper describes analysis of two additional components from TSTA, small diameter gas piping that handled small amounts of tritium in a nitrogen carrier gas, and the flame arrestor used in this piping system. The operating experiences and the component failure rates for these components are discussed in this paper. Comparison data from other applications are also presented.

  20. Leak test of the pipe line for radioactive liquid waste

    International Nuclear Information System (INIS)

    Machida, Chuji; Mori, Shoji.

    1976-01-01

    In the Tokai Research Establishment, most of the radioactive liquid waste is transferred to a wastes treatment facility through pipe lines. As part of the pipe lines a cast iron pipe for town gas is used. Leak test has been performed on all joints of the lines. For the joints buried underground, the test was made by radioactivity measurement of the soil; and for the joints in drainage ditch by the pressure and bubble methods. There were no leakage at all, indicating integrity of all the joints. On the other hand, it is also known by the other test that the corrosion of inner surface of the piping due to liquid waste is only slight. The pipe lines for transferring radioactive liquid waste are thus still usable. (auth.)

  1. Experimental investigation and numerical simulations of void profile development in a vertical cylindrical pipe

    International Nuclear Information System (INIS)

    Grossetete, Claudie

    1995-01-01

    We present here an experimental investigation and some numerical simulations of void profile development in a vertical cylindrical pipe. This study is motivated by the lack of information dealing with the influence of entrance effects and bubble size evolution upon the multidimensional development of upward bubbly flow in pipe. The axial development of two-phase air-water upward bubbly and bubbly-to-slug transition flows in a vertical pipe is investigated experimentally first. Profiles of liquid mean velocity, liquid axial turbulent intensity, void fraction, bubble frequency, bubble velocity, mean equivalent bubble diameter and volumetric interfacial area are determined along the same test section at three axial locations. It is found that the bubbly-to-slug transition can be deduced from the simultaneous analysis of the different measured profiles. Local analysis of the studied bubbly flows shows that their development does not depend on the shape of the void distribution at the inlet. However, it is found that the bubble size evolution strongly affects the void distribution. Secondly, multidimensional numerical simulations of bubbly flows with very different gas injection modes are made with the help of the tri dimensional two-fluid ASTRID code. It is shown that the classical models used to close the transverse momentum equations of the two-fluid model (lift and dispersion forces) do not capture the physical phenomena of bubble migration in pipe flows. (author) [fr

  2. Experimental investigation and numerical simulations of void profile development in a vertical cylindrical pipe

    International Nuclear Information System (INIS)

    Grossetete, C.

    1995-12-01

    We present here an experimental investigation and some numerical simulations of void profile development in a vertical cylindrical pipe. This study is motivated by the lack of information dealing with the influence of entrance effects and bubble size evolution upon the multidimensional development of upward bubbly flow in pipe. The axial development of two-phase air-water upward bubbly and bubbly-to-slug transition flows in a vertical pipe is investigated experimentally first. Profiles of liquid mean velocity, liquid axial turbulent intensity, void fraction, bubble frequency, bubble velocity, mean equivalent bubble diameter and volumetric interfacial area are determined along the same test section at three axial locations. It is found that the bubbly-to-slug transition can be deduced from the simultaneous analysis of the different measured profiles. Local analysis of the studied bubbly flows shows that their development does not depend on the shape of the void distribution at the inlet. However, it is found that the bubble size evolution strongly affects the void distribution. Secondly, multidimensional numerical simulations of bubbly flows with very different gas injection modes are made with the help of the tridimensional two-fluid ASTRID code. It is shown that the classical models used to close the transverse momentum equations of the two-fluid model (lift and dispersion forces) do not capture the physical phenomena of bubble migration in pipe flows

  3. Experimental Study of gas-liquid two-phase flow affected by wall surface wettability

    International Nuclear Information System (INIS)

    Takamasa, T.; Hazuku, T.; Hibiki, T.

    2008-01-01

    To evaluate the effect of wall surface wettability on the characteristics of upward gas-liquid two-phase flow in a vertical pipe, an experimental study was performed using three test pipes: an acrylic pipe, a hydrophilic pipe and a hydrophobic pipe. Basic flow characteristics such as flow patterns, pressure drop and void fraction were measured in these three pipes. In the hydrophilic pipe, a slug to churn flow transition boundary was shifted to a higher gas velocity at a given liquid velocity, whereas a churn to annular flow transition boundary was shifted to a lower gas velocity at a given liquid velocity. In the hydrophobic pipe, an inverted-churn flow regime was observed in the region where the churn flow regime was observed in the acrylic pipe, while a droplet flow regime was observed in the region where an annular flow regime was observed in the acrylic pipe. At a high gas flow rate, the mean void fraction in the hydrophobic pipe was higher than in the acrylic pipe. The effect of surface wettability on frictional pressure loss was confirmed to be insignificant under the present experimental conditions

  4. Removal of a section of the CMS beam pipe

    CERN Document Server

    CERN Bulletin

    2013-01-01

    Over recent weeks, members of the TE-VSC group have been removing seven components of the beam pipe located at the heart of the CMS detector. The delicate operations involved have been performed in several stages as the detector opening work has progressed.   Of the seven components concerned, only the central vacuum pipe will be replaced. The other six will be stored in a special radiation-shielded area on the surface and subsequently reinstalled ready for the resumption of machine operation. The video below, which was filmed on 15 May, shows one of the seven components of the vacuum pipe - the HFCT2, located to the right of the interaction point – being brought up from the CMS cavern to the surface by the transport team at Point 5.

  5. Development of VHTR high temperature piping in KHI

    International Nuclear Information System (INIS)

    Suzuki, Nobuhiro; Takano, Shiro

    1981-01-01

    The high temperature pipings used for multi-purpose high temperature gas-cooled reactors are the internally insulated pipings for transporting high temperature, high pressure helium at 1000 deg C and 40 kgf/cm 2 , and the influences exerted by their performance as well as safety to the plants are very large. Kawasaki Heavy Industries, Ltd., has engaged in the development of the high temperature pipings for VHTRs for years. In this report, the progress of the development, the test carried out recently and the problems for future are described. KHI manufactured and is constructing a heater and internally insulated helium pipings for the large, high temperature structure testing loop constructed by Japan Atomic Energy Research Institute. The design concept for the high temperature pipings is to separate the temperature boundary and the pressure boundary, therefore, the double walled construction with internal heat insulation was adopted. The requirements for the high temperature pipings are to prevent natural convection, to prevent bypass flow, to minimize radiation heat transfer and to reduce heat leak through insulator supporters. The heat insulator is composed of two layers, metal laminate insulator and fiber insulator of alumina-silica. The present state of development of the high temperature pipings for VHTRs is reported. (Kako, I.)

  6. Small biogas plant with integrated gas and stirrer bellows. Kleinbiogasanlage mit integriertem Gas- und Ruehrbalg

    Energy Technology Data Exchange (ETDEWEB)

    Anon,

    1985-09-12

    The content of a flexible rectangular septic tank is stirred under the pressure produced by the gas generated by the rotting mass by means of integrated gas and stirring bellows. Their volume is indirectly connected via a gas pipe with the volume of the container, so that the gas formed in the septic tank can reach the bellows via this pipe and can expand this, which causes mixing and at the same time the rotting liquid exerts a pressure on the gas in the bellows. In this way, one can provide gas constantly under pressure. The formation of sinking and floating layers is prevented.

  7. Feed gas contaminant control in ion transport membrane systems

    Science.gov (United States)

    Carolan, Michael Francis [Allentown, PA; Minford, Eric [Laurys Station, PA; Waldron, William Emil [Whitehall, PA

    2009-07-07

    Ion transport membrane oxidation system comprising an enclosure having an interior and an interior surface, inlet piping having an internal surface and adapted to introduce a heated feed gas into the interior of the enclosure, and outlet piping adapted to withdraw a product gas from the interior of the enclosure; one or more planar ion transport membrane modules disposed in the interior of the enclosure, each membrane module comprising mixed metal oxide material; and a preheater adapted to heat a feed gas to provide the heated feed gas to the inlet piping, wherein the preheater comprises an interior surface. Any of the interior surfaces of the enclosure, the inlet piping, and the preheater may be lined with a copper-containing metal lining. Alternatively, any of the interior surfaces of the inlet piping and the preheater may be lined with a copper-containing metal lining and the enclosure may comprise copper.

  8. Pipe Explorer surveying system. Innovative technology summary report

    International Nuclear Information System (INIS)

    1999-06-01

    The US Department of Energy's (DOE) Chicago Operations Office and the DOE's Federal Energy Technology Center (FETC) developed a Large Scale Demonstration Project (LSDP) at the Chicago Pile-5 Research Reactor (CP-5) at Argonne National Laboratory-East (ANL). The objective of the LSDP is to demonstrate potentially beneficial decontamination and decommissioning (D and D) technologies in comparison with current baseline technologies. The Pipe Explorer trademark system was developed by Science and Engineering Associates, Inc. (SEA), Albuquerque, NM as a deployment method for transporting a variety of survey tools into pipes and ducts. Tools available for use with the system include alpha, beta and gamma radiation detectors; video cameras; and pipe locator beacons. Different versions of this technology have been demonstrated at three other sites; results of these demonstrations are provided in an earlier Innovative Technology Summary Report. As part of a D and D project, characterization radiological contamination inside piping systems is necessary before pipes can be recycled, remediated or disposed. This is usually done manually by surveying over the outside of the piping only, with limited effectiveness and risk of worker exposure. The pipe must be accessible to workers, and embedded pipes in concrete or in the ground would have to be excavated at high cost and risk of exposure to workers. The advantage of the Pipe Explorer is its ability to perform in-situ characterization of pipe internals

  9. Accelerated life tests of specimen heat pipe from Communication Technology Satellite (CTS) project

    Science.gov (United States)

    Tower, L. K.; Kaufman, W. B.

    1977-01-01

    A gas-loaded variable conductance heat pipe of stainless steel with methanol working fluid identical to one now on the CTS satellite was life tested in the laboratory at accelerated conditions for 14 200 hours, equivalent to about 70 000 hours at flight conditions. The noncondensible gas inventory increased about 20 percent over the original charge. The observed gas increase is estimated to increase operating temperature by about 2.2 C, insufficient to harm the electronic gear cooled by the heat pipes in the satellite. Tests of maximum heat input against evaporator elevation agree well with the manufacturer's predictions.

  10. Effects of cyanoacrylate fuming, time after recovery, and location of biological material on the recovery and analysis of DNA from post-blast pipe bomb fragments*.

    Science.gov (United States)

    Bille, Todd W; Cromartie, Carter; Farr, Matthew

    2009-09-01

    This study investigated the effects of time, cyanoacrylate fuming, and location of the biological material on DNA analysis of post-blast pipe bomb fragments. Multiple aliquots of a cell suspension (prepared by soaking buccal swabs in water) were deposited on components of the devices prior to assembly. The pipe bombs were then deflagrated and the fragments recovered. Fragments from half of the devices were cyanoacrylate fumed. The cell spots on the fragments were swabbed and polymerase chain reaction/short tandem repeat analysis was performed 1 week and 3 months after deflagration. A significant decrease in the amount of DNA recovered was observed between samples collected and analyzed within 1 week compared with the samples collected and analyzed 3 months after deflagration. Cyanoacrylate fuming did not have a measurable effect on the success of the DNA analysis at either time point. Greater quantities of DNA were recovered from the pipe nipples than the end caps. Undeflagrated controls showed that the majority (>95%) of the DNA deposited on the devices was not recovered at a week or 3 months.

  11. Heat pipe based cold energy storage systems for datacenter energy conservation

    International Nuclear Information System (INIS)

    Singh, Randeep; Mochizuki, Masataka; Mashiko, Koichi; Nguyen, Thang

    2011-01-01

    In the present paper, design and economics of the novel type of thermal control system for datacenter using heat pipe based cold energy storage has been proposed and discussed. Two types of cold energy storage system namely: ice storage system and cold water storage system are explained and sized for datacenter with heat output capacity of 8800 kW. Basically, the cold energy storage will help to reduce the chiller running time that will save electricity related cost and decrease greenhouse gas emissions resulting from the electricity generation from non-renewable sources. The proposed cold energy storage system can be retrofit or connected in the existing datacenter facilities without major design changes. Out of the two proposed systems, ice based cold energy storage system is mainly recommended for datacenters which are located in very cold locations and therefore can offer long term seasonal storage of cold energy within reasonable cost. One of the potential application domains for ice based cold energy storage system using heat pipes is the emergency backup system for datacenter. Water based cold energy storage system provides more compact size with short term storage (hours to days) and is potential for datacenters located in areas with yearly average temperature below the permissible cooling water temperature (∼25 o C). The aforesaid cold energy storage systems were sized on the basis of metrological conditions in Poughkeepsie, New York. As an outcome of the thermal and cost analysis, water based cold energy storage system with cooling capability to handle 60% of datacenter yearly heat load will provide an optimum system size with minimum payback period of 3.5 years. Water based cold energy storage system using heat pipes can be essentially used as precooler for chiller. Preliminary results obtained from the experimental system to test the capability of heat pipe based cold energy storage system have provided satisfactory outcomes and validated the proposed

  12. Gas-liquid flow around an obstacle in a vertical pipe

    International Nuclear Information System (INIS)

    Prasser, Horst-Michael; Beyer, Matthias; Frank, Thomas; Al Issa, Suleiman; Carl, Helmar; Pietruske, Heiko; Schuetz, Peter

    2008-01-01

    This paper presents a novel technique to study the two-phase flow field around an asymmetric obstruction in a vertical pipe with a nominal diameter of DN200. Main feature of the experiments is the shifting of a half-moon shaped diaphragm causing the obstruction along the axis of the pipe. In this way, the 3D void field is scanned with a stationary wire-mesh sensor that supplies data with a spatial resolution of 3 mm over the cross-section and a measuring frequency of 2.5 kHz. Besides the measurement of time-averaged void fraction fields and bubble-size distributions, novel data evaluation methods were developed to extract estimated liquid velocity profiles as well as lateral components of bubble velocities from the wire-mesh sensor data. The combination of void fraction fields and velocity profiles offer the opportunity to analyse a two-phase flow in a geometry that owns a series of features characteristic for complex components of power and chemical plant equipment. Such characteristics are sharp edges with flow separation, recirculation areas, jet formation, stagnation points and curved stream-lines. The tests were performed with an air-water flow at nearly ambient conditions and with a saturated steam-water mixture at 6.5 MPa. The superficial velocities of liquid and gas or, respectively, vapour were varied in a wide range. The flow structure upstream and downstream of the obstacle is characterized in detail. Bubble size dependent effects of bubble accumulation and migration are discussed on basis of void-fraction profiles decomposed into bubble-size classes. A pronounced influence of the fluid parameters was found in the behaviour of bubbles at the boundary of the jet coming from the non-obstructed part of the cross-section. In case of an air-water flow, bubbles are restrained from entering the jet, a phenomenon which was not observed in high-pressure steam-water flow. A detailed uncertainty analyse of the velocity assessments finishes the presented paper. A

  13. Fatigue of LMFBR piping due to flow stratification

    International Nuclear Information System (INIS)

    Woodward, W.S.

    1983-01-01

    Flow stratification due to reverse flow was simulated in a 1/5-scale water model of a LMFBR primary pipe loop. The stratified flow was observed to have a dynamic interface region which oscillated in a wave pattern. The behavior of the interface was characterized in terms of location, local temperature fluctuation and duration for various reverse flow conditions. A structural assessment was performed to determine the effects of stratified flow on the fatigue life of the pipe. Both the static and dynamic aspects of flow stratification were examined. The dynamic interface produces thermal striping on the inside of the pipe wall which is shown to have the most deleterious effect on the pipe wall and produce significant fatigue damage relative to a static interface

  14. Fatigue of LMFBR piping due to flow stratification

    Energy Technology Data Exchange (ETDEWEB)

    Woodward, W.S.

    1983-01-01

    Flow stratification due to reverse flow was simulated in a 1/5-scale water model of a LMFBR primary pipe loop. The stratified flow was observed to have a dynamic interface region which oscillated in a wave pattern. The behavior of the interface was characterized in terms of location, local temperature fluctuation and duration for various reverse flow conditions. A structural assessment was performed to determine the effects of stratified flow on the fatigue life of the pipe. Both the static and dynamic aspects of flow stratification were examined. The dynamic interface produces thermal striping on the inside of the pipe wall which is shown to have the most deleterious effect on the pipe wall and produce significant fatigue damage relative to a static interface.

  15. Study of gas pipelines cracks using transmission and scattering measures with nuclear technique

    International Nuclear Information System (INIS)

    Freitas, Marcela F.; Salgado, César M.

    2017-01-01

    Most of the natural gas production is transported through pipelines that require periodic inspections to evaluate the structural integrity of the pipelines due to possible defects caused by degradation that can rupture causing leakage of the fluid causing major disasters. Based on this, the project presents a methodology for predicting cracks in pipe used in gas pipelines. The approximation is based on the principles of gamma densitometry to calculate the density of the pipe wall in order to investigate possible cracks. The natural gas fluid is found in such systems and interferes in the density calculations and therefore will be considered in the simulations. The detection system uses a narrow beam geometry appropriately, comprising gamma ray source ( 137 Cs) and NaI(Tl) 3 ″ x 3 ″ detectors for calculating transmitted and scattered photons. Different positioning angles of the detector are investigated. In this study, the MCNP-X code is used to perform the simulations, in order to develop a counting geometry. Simulations of different thicknesses of the crack were also used to determine the minimum thickness detected by the two NaI(Tl) detectors. Having equipment that can estimate cracks present in pipes used in gas pipelines, in addition to predicting their location can reduce costs and make a major contribution to this sector. (author)

  16. Study of gas pipelines cracks using transmission and scattering measures with nuclear technique

    Energy Technology Data Exchange (ETDEWEB)

    Freitas, Marcela F.; Salgado, César M., E-mail: marcelafreita@gmail.com, E-mail: otero@ien.gov.br [Instituto de Engenharia Nuclear (IEN/CNEN-RJ), Rio de Janeiro, RJ (Brazil)

    2017-07-01

    Most of the natural gas production is transported through pipelines that require periodic inspections to evaluate the structural integrity of the pipelines due to possible defects caused by degradation that can rupture causing leakage of the fluid causing major disasters. Based on this, the project presents a methodology for predicting cracks in pipe used in gas pipelines. The approximation is based on the principles of gamma densitometry to calculate the density of the pipe wall in order to investigate possible cracks. The natural gas fluid is found in such systems and interferes in the density calculations and therefore will be considered in the simulations. The detection system uses a narrow beam geometry appropriately, comprising gamma ray source ({sup 137}Cs) and NaI(Tl) 3 ″ x 3 ″ detectors for calculating transmitted and scattered photons. Different positioning angles of the detector are investigated. In this study, the MCNP-X code is used to perform the simulations, in order to develop a counting geometry. Simulations of different thicknesses of the crack were also used to determine the minimum thickness detected by the two NaI(Tl) detectors. Having equipment that can estimate cracks present in pipes used in gas pipelines, in addition to predicting their location can reduce costs and make a major contribution to this sector. (author)

  17. Research on Buckling State of Prestressed Fiber-Strengthened Steel Pipes

    Science.gov (United States)

    Wang, Ruheng; Lan, Kunchang

    2018-01-01

    The main restorative methods of damaged oil and gas pipelines include welding reinforcement, fixture reinforcement and fiber material reinforcement. Owing to the severe corrosion problems of pipes in practical use, the research on renovation and consolidation techniques of damaged pipes gains extensive attention by experts and scholars both at home and abroad. The analysis of mechanical behaviors of reinforced pressure pipelines and further studies focusing on “the critical buckling” and intensity of pressure pipeline failure are conducted in this paper, providing theoretical basis to restressed fiber-strengthened steel pipes. Deformation coordination equations and buckling control equations of steel pipes under the effect of prestress is deduced by using Rayleigh Ritz method, which is an approximation method based on potential energy stationary value theory and minimum potential energy principle. According to the deformation of prestressed steel pipes, the deflection differential equation of prestressed steel pipes is established, and the critical value of buckling under prestress is obtained.

  18. 49 CFR 192.65 - Transportation of pipe.

    Science.gov (United States)

    2010-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Materials § 192.65 Transportation of pipe. (a) Railroad...

  19. Exhaust gas recirculation apparatus for internal combustion engine

    Energy Technology Data Exchange (ETDEWEB)

    Shigemori, M; Eguchi, N

    1975-01-07

    An exhaust gas recirculation device to reduce nitrogen oxides emission from internal combustion engines is described. The recirculation is achieved by employing a tube connecting between the exhaust pipe and intake tube. A throttle valve is installed within the exhaust pipe between the muffler and recirculation tube, and regulated by exhaust gas temperature. Whenever the gas temperature is high, the valve closes and increases the gas flow to the intake tube. A temperature sensor is installed within the exhaust pipe and controls a solenoid or magnetic air valve linking to the throttle valve through a relay. The recirculation tube can be cooled by a fan to improve the engine power.

  20. Transient Simulation of Accumulating Particle Deposition in Pipe Flow

    Science.gov (United States)

    Hewett, James; Sellier, Mathieu

    2015-11-01

    Colloidal particles that deposit in pipe systems can lead to fouling which is an expensive problem in both the geothermal and oil & gas industries. We investigate the gradual accumulation of deposited colloids in pipe flow using numerical simulations. An Euler-Lagrangian approach is employed for modelling the fluid and particle phases. Particle transport to the pipe wall is modelled with Brownian motion and turbulent diffusion. A two-way coupling exists between the fouled material and the pipe flow; the local mass flux of depositing particles is affected by the surrounding fluid in the near-wall region. This coupling is modelled by changing the cells from fluid to solid as the deposited particles exceed each local cell volume. A similar method has been used to model fouling in engine exhaust systems (Paz et al., Heat Transfer Eng., 34(8-9):674-682, 2013). We compare our deposition velocities and deposition profiles with an experiment on silica scaling in turbulent pipe flow (Kokhanenko et al., 19th AFMC, 2014).

  1. Mechanism for in-pipe inspection; Dispositivo para inspecao de dutos

    Energy Technology Data Exchange (ETDEWEB)

    Freitas, Gustavo Medeiros; Dutra, Max Suell [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil)

    2008-07-01

    The internal inspection of pipes is becoming a routine activity thanks to their importance on transportation of substances such as oil and natural gas. This paper addresses a mechanism capable of working inside pipes of different diameters that may present extreme curves and inclinations. The mechanism is composed of modules with devices that provide adjustable contact with the duct, using wheels on the contact points. The robot moves inside the pipe creating a virtual spindle. For that, two parts are used: the first one, guided along the pipe by a set of wheels, moves parallel to the axis of the pipe; the second part is attached to a motor. The motor rotation forces the mechanism to follow a helical motion, with tilted wheels rotating about the axis of the pipe. Each adjustable contact device works like a lever, pressing the wheel against the pipe. The base of the device can be actively rotated, modifying the angle of the wheel in relation to the pipe (equivalent to the step of the spindle), permitting the motion of the system in both directions, with specific velocity. According to the applied angle, the robot changes the relation between torque and displacement velocity. (author)

  2. Two-phase flow structure in large diameter pipes

    International Nuclear Information System (INIS)

    Smith, T.R.; Schlegel, J.P.; Hibiki, T.; Ishii, M.

    2012-01-01

    Highlights: ► Local profiles of various quantities measured in large diameter pipe. ► Database for interfacial area in large pipes extended to churn-turbulent flow. ► Flow regime map confirms previous models for flow regime transitions. ► Data will be useful in developing interfacial area transport models for large pipes. - Abstract: Flow in large pipes is important in a wide variety of applications. In the nuclear industry in particular, understanding of flow in large diameter pipes is essential in predicting the behavior of reactor systems. This is especially true of natural circulation Boiling Water Reactor (BWR) designs, where a large-diameter chimney above the core provides the gravity head to drive circulation of the coolant through the reactor. The behavior of such reactors during transients and during normal operation will be predicted using advanced thermal–hydraulics analysis codes utilizing the two-fluid model. Essential to accurate two-fluid model calculations is reliable and accurate computation of the interfacial transfer terms. These interfacial transfer terms can be expressed as the product of one term describing the potential driving the transfer and a second term describing the available surface area for transfer, or interfacial area concentration. Currently, the interfacial area is predicted using flow regime dependent empirical correlations; however the interfacial area concentration is best computed through the use of the one-dimensional interfacial area transport equation (IATE). To facilitate the development of IATE source and sink term models in large-diameter pipes a fundamental understanding of the structure of the two-phase flow is essential. This understanding is improved through measurement of the local void fraction, interfacial area concentration and gas velocity profiles in pipes with diameters of 0.102 m and 0.152 m under a wide variety of flow conditions. Additionally, flow regime identification has been performed to

  3. In-Situ Measurements of Low Enrichment Uranium Holdup Process Gas Piping at K-25 - Paper for Waste Management Symposia 2010 East Tennessee Technology Park Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Rasmussen, B.

    2010-01-01

    This document is the final version of a paper submitted to the Waste Management Symposia, Phoenix, 2010, abstract BJC/OR-3280. The primary document from which this paper was condensed is In-Situ Measurement of Low Enrichment Uranium Holdup in Process Gas Piping at K-25 Using NaI/HMS4 Gamma Detection Systems, BJC/OR-3355. This work explores the sufficiency and limitations of the Holdup Measurement System 4 (HJVIS4) software algorithms applied to measurements of low enriched uranium holdup in gaseous diffusion process gas piping. HMS4 has been used extensively during the decommissioning and demolition project of the K-25 building for U-235 holdup quantification. The HMS4 software is an integral part of one of the primary nondestructive assay (NDA) systems which was successfully tested and qualified for holdup deposit quantification in the process gas piping of the K-25 building. The initial qualification focused on the measurement of highly enriched UO 2 F 2 deposits. The purpose of this work was to determine if that qualification could be extended to include the quantification of holdup in UO 2 F 2 deposits of lower enrichment. Sample field data are presented to provide evidence in support of the theoretical foundation. The HMS4 algorithms were investigated in detail and found to sufficiently compensate for UO 2 F 2 source self-attenuation effects, over the range of expected enrichment (4-40%), in the North and East Wings of the K-25 building. The limitations of the HMS4 algorithms were explored for a described set of conditions with respect to area source measurements of low enriched UO 2 F 2 deposits when used in conjunction with a 1 inch by 1/2 inch sodium iodide (NaI) scintillation detector. The theoretical limitations of HMS4, based on the expected conditions in the process gas system of the K-25 building, are related back to the required data quality objectives (DQO) for the NBA measurement system established for the K-25 demolition project. The combined

  4. Failure analysis on a ruptured petrochemical pipe

    Energy Technology Data Exchange (ETDEWEB)

    Harun, Mohd [Industrial Technology Division, Malaysian Nuclear Agency, Ministry of Science, Technology and Innovation Malaysia, Bangi, Kajang, Selangor (Malaysia); Shamsudin, Shaiful Rizam; Kamardin, A. [Univ. Malaysia Perlis, Jejawi, Arau (Malaysia). School of Materials Engineering

    2010-08-15

    The failure took place on a welded elbow pipe which exhibited a catastrophic transverse rupture. The failure was located on the welding HAZ region, parallel to the welding path. Branching cracks were detected at the edge of the rupture area. Deposits of corrosion products were also spotted. The optical microscope analysis showed the presence of transgranular failures which were related to the stress corrosion cracking (SCC) and were predominantly caused by the welding residual stress. The significant difference in hardness between the welded area and the pipe confirmed the findings. Moreover, the failure was also caused by the low Mo content in the stainless steel pipe which was detected by means of spark emission spectrometer. (orig.)

  5. Spinning pipe gas lens aberrations along the axis and in the boundary layer

    CSIR Research Space (South Africa)

    Mafusire, C

    2013-11-01

    Full Text Available When the walls of an open-ended horizontal steel pipe are heated before the pipe is rotated along its axis, the exchange of the expelled heated air with the incoming cooler air, sucked in along the axis, results in a medium capable of focusing a...

  6. SEALING LARGE-DIAMETER CAST-IRON PIPE JOINTS UNDER LIVE CONDITIONS

    Energy Technology Data Exchange (ETDEWEB)

    Kiran M. Kothari; Gerard T. Pittard

    2005-07-01

    Utilities in the U.S. operate over 75,000 km (47,000 miles) of old cast-iron pipes for gas distribution. Bell-and-spigot joints that connect pipe sections together tend to leak as these pipes age. Current repair practices are costly and highly disruptive. The objective of this program is to design, test and commercialize a robotic system capable of sealing multiple castiron bell and spigot joints from a single pipe entry point. The proposed system will perform repairs with the pipe in service by traveling through the pipe, cleaning each joint surface, and installing a stainless-steel sleeve lined with an epoxy-impregnated felt across the joint. This approach will save considerable time and labor, minimize excavation, avoid traffic disruption, and eliminate any requirement to interrupt service to customers (which would result in enormous expense to utilities). Technical challenges include: (1) repair sleeves must compensate for diametric variation and eccentricity of old cast-iron pipes; (2) the assembly must travel long distances through pipes containing debris; (3) the pipe wall must be effectively cleaned in the immediate area of the joint to assure good bonding of the sleeve; and (4) an innovative bolt-on entry fitting is required to conduct safe repair operations on live mains.

  7. Friction factor in smooth and rough gas pipelines. An experimental study

    Energy Technology Data Exchange (ETDEWEB)

    Sletfjerding, Elling

    1999-01-01

    Flow of high pressure natural gas in pipelines has been studied experimentally. Pipeline flow of natural gas is characterized by high Reynolds numbers due to the low viscosity and relatively high density of pressurized gas. Friction factor correlations for high Reynolds number flow in smooth and rough pipes were developed. To study the effect of wall roughness on pipe flow at high Reynolds numbers 8 test pipes with different wall roughness were fabricated. The wall roughness in 6 of the test pipes was varied by adding glass beads in an epoxy coating applied on the pipe wall. One test pipe was treated with a smooth epoxy coating and one was left untreated. The inner diameter of the test pipes was 150 mm. Measurements of the pressure drop in the pipes were made in a closed flow loop at line pressures of 25, 70, 95 and 120 bar. The Reynolds number of the flow was varied in the range 2-30 million. The wall roughness of the test pipes was measured with a stylus instrument. Correlations between the directly measured wall roughness and the friction factor at fully rough flow conditions were presented. To characterize the wall roughness of the test pipes a parameter combining a measure of the roughness height (R{sub q}) and the texture of the wall roughness was used. Due to the high Reynolds number of the flow, minute irregularities of the pipe wall had significant effect on the friction factor in the pipe. The measured wall roughness of the test pipes was in the range 1.4 < R{sub q} <31 (my)m. The flow experiments in test pipes was compared with data from operating pipelines in the North Sea. The offshore pipelines are coated with the same epoxy coating as used in the test pipes. The friction factor in coated offshore gas pipelines showed smooth behavior when the additional pressure drop due to welds were accounted for. The study of coated gas pipelines showed that the friction factor was significantly lower than predicted by standard correlations.

  8. The 'new' gas market

    International Nuclear Information System (INIS)

    Walker, Vornel

    2000-01-01

    The use of computer-aided 3-dimensional design tools to overcome problems associated with extraction of gas from unconventional gas deposits such as shale, sand and coal gas fields in landlocked nations is examined, and the economics of land based gas exploration in the USA, and the transport of the product to market are considered. The use of 3D design tools by the Pearl Development Company for providing engineering solutions for the recovery of natural gas liquids (NGL) for the Thunder Creek Gas Services company servicing the Powder River Basin in Wyoming and utilisation of the CADWorx/PIPE 3D piping design tool are reported. The benefits of the software package which allows easy visualisation of designs and produces 2D drawings from multi-discipline plant models are outlined

  9. Numerical Analysis on the Compressible Flow Characteristics of Supersonic Jet Caused by High-Pressure Pipe Rupture Using CFD

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Jong-Kil; Yoon, Jun-Kyu [Gachon Univ., Sungnam (Korea, Republic of); Kim, Kwang-Chu [KEPCO-E& C, Kimchun (Korea, Republic of)

    2017-10-15

    A rupture in a high-pressure pipe causes the fluid in the pipe to be discharged in the atmosphere at a high speed resulting in a supersonic jet that generates the compressible flow. This supersonic jet may display complicated and unsteady behavior in general . In this study, Computational Fluid Dynamics (CFD) analysis was performed to investigate the compressible flow generated by a supersonic jet ejected from a high-pressure pipe. A Shear Stress Transport (SST) turbulence model was selected to analyze the unsteady nature of the flow, which depends upon the various gases as well as the diameter of the pipe. In the CFD analysis, the basic boundary conditions were assumed to be as follows: pipe of diameter 10 cm, jet pressure ratio of 5, and an inlet gas temperature of 300 K. During the analysis, the behavior of the shockwave generated by a supersonic jet was observed and it was found that the blast wave was generated indirectly. The pressure wave characteristics of hydrogen gas, which possesses the smallest molecular mass, showed the shortest distance to the safety zone. There were no significant difference observed for nitrogen gas, air, and oxygen gas, which have similar molecular mass. In addition, an increase in the diameter of the pipe resulted in the ejected impact caused by the increased flow rate to become larger and the zone of jet influence to extend further.

  10. Pipe-to-pipe impact program

    International Nuclear Information System (INIS)

    Alzheimer, J.M.; Bampton, M.C.C.; Friley, J.R.; Simonen, F.A.

    1984-06-01

    This report documents the tests and analyses performed as part of the Pipe-to-Pipe Impact (PTPI) Program at the Pacific Northwest Laboratory. This work was performed to assist the NRC in making licensing decisions regarding pipe-to-pipe impact events following postulated breaks in high energy fluid system piping. The report scope encompasses work conducted from the program's start through the completion of the initial hot oil tests. The test equipment, procedures, and results are described, as are analytic studies of failure potential and data correlation. Because the PTPI Program is only partially completed, the total significance of the current test results cannot yet be accurately assessed. Therefore, although trends in the data are discussed, final conclusions and recommendations will be possible only after the completion of the program, which is scheduled to end in FY 1984

  11. LHC Experimental Beam Pipe Upgrade during LS1

    CERN Document Server

    Lanza, G; Baglin, V; Chiggiato, P

    2014-01-01

    The LHC experimental beam pipes are being improved during the ongoing Long Shutdown 1 (LS1). Several vacuum chambers have been tested and validated before their installation inside the detectors. The validation tests include: leak tightness, ultimate vacuum pressure, material outgassing rate, and residual gas composition. NEG coatings are assessed by sticking probability measurement with the help of Monte Carlo simulations. In this paper the motivation for the beam pipe upgrade, the validation tests of the components and the results are presented and discussed.

  12. Development of remote pipe cutting tool for divertor cassettes in JT-60SA

    International Nuclear Information System (INIS)

    Hayashi, Takao; Sakurai, Shinji; Shibanuma, Kiyoshi; Sakasai, Akira

    2014-01-01

    Remote pipe cutting tool accessing from inside pipe has been newly developed for JT-60SA. The tool head equips a disk-shaped cutter blade and four rollers which are subjected to the reaction force. The tool pushes out the cutter blade by decreasing the distance between two cams. The tool cuts a cooling pipe by both pushing out the cutter blade and rotating the tool head itself. The roller holder is not pushed out anymore after touching the inner wall of the pipe. In other words, only cutter blade is pushed out after bringing the tool axis into the pipe axis. Outer diameter of the cutting tool head is 44 mm. The cutting tool is able to push out the cutter blade up to 32.5 mm in radius, i.e. 65 mm in diameter, which is enough to cut the pipe having an outer diameter of 59.8 mm. The thickness and material of the cooling pipe are 2.8 mm and SUS316L, respectively. The length of the cutting tool head is about 1 m. The tool is able to cut a pipe locates about 480 mm in depth from the mounting surface on the divertor cassette. The pipe cutting system equips two cutting heads and they are able to cut two pipes at the same time in order to remove the inner target plate. Reproducibility of the cross-sectional shape of the cut pipe is required for re-welding. The degree of reproducibility is inside 0.1 mm except for burr at outside of the pipe, which is enough to re-weld the cut pipe. Some swarf is generated during cutting the double-layered pipe assuming a plug located on the top of the pipe. The swarf is deposited on the bottom of the plug and collected by pulling out the plug in the actual equipment

  13. 77 FR 17119 - Pipeline Safety: Cast Iron Pipe (Supplementary Advisory Bulletin)

    Science.gov (United States)

    2012-03-23

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... national attention and highlight the need for continued safety improvements to aging gas pipeline systems... 26, 1992) covering the continued use of cast iron pipe in natural gas distribution pipeline systems...

  14. Detection of underground water distribution piping system and leakages using ground penetrating radar (GPR)

    Science.gov (United States)

    Amran, Tengku Sarah Tengku; Ismail, Mohamad Pauzi; Ahmad, Mohamad Ridzuan; Amin, Mohamad Syafiq Mohd; Sani, Suhairy; Masenwat, Noor Azreen; Ismail, Mohd Azmi; Hamid, Shu-Hazri Abdul

    2017-01-01

    A water pipe is any pipe or tubes designed to transport and deliver water or treated drinking with appropriate quality, quantity and pressure to consumers. The varieties include large diameter main pipes, which supply entire towns, smaller branch lines that supply a street or group of buildings or small diameter pipes located within individual buildings. This distribution system (underground) is used to describe collectively the facilities used to supply water from its source to the point of usage. Therefore, a leaking in the underground water distribution piping system increases the likelihood of safe water leaving the source or treatment facility becoming contaminated before reaching the consumer. Most importantly, leaking can result in wastage of water which is precious natural resources. Furthermore, they create substantial damage to the transportation system and structure within urban and suburban environments. This paper presents a study on the possibility of using ground penetrating radar (GPR) with frequency of 1GHz to detect pipes and leakages in underground water distribution piping system. Series of laboratory experiment was designed to investigate the capability and efficiency of GPR in detecting underground pipes (metal and PVC) and water leakages. The data was divided into two parts: 1. detecting/locating underground water pipe, 2. detecting leakage of underground water pipe. Despite its simplicity, the attained data is proved to generate a satisfactory result indicating GPR is capable and efficient, in which it is able to detect the underground pipe and presence of leak of the underground pipe.

  15. Seismic design of piping systems

    International Nuclear Information System (INIS)

    Anglaret, G.; Beguin, J.L.

    1986-01-01

    This paper deals with the method used in France for the PWR nuclear plants to derive locations and types of supports of auxiliary and secondary piping systems taking earthquake in account. The successive steps of design are described, then the seismic computation method and its particular conditions of applications for piping are presented. The different types of support (and especially seismic ones) are described and also their conditions of installation. The method used to compare functional tests results and computation results in order to control models is mentioned. Some experiments realised on site or in laboratory, in order to validate models and methods, are presented [fr

  16. Use of pipe saks on pipeline construction

    Energy Technology Data Exchange (ETDEWEB)

    Ghio, Alberto F.M.; Caciatori, Angelo [Galvao Engenharia S.A., Sao Paulo, SP (Brazil); Ruschi, Allan A.; Santos, Felipe A. dos; Barros, Horacio B. de; Loureiro, Regis R. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The use of new technologies applied to pipeline construction and assembling, aimed at enhancing productivity has been searched by PETROBRAS, throughout its subcontractors, assemblers, by transference in the mentioned constructions. Along the construction of Cacimbas Catu Pipeline, Spread 1 A, placed between the Cacimbas Gas Treatment Station (Linhares, ES) and the future Compression Station of Sao Mateus (ES), one, by means of surveys, noticed that the length of flooded or prone to flooding areas was way superior to the ones foreseen in the basic design. One of the broadly used methods for assuring buoyancy control is concreting the pipes. Such method deeply impacts work's logistics in for instance, the pipe stringing work; in this one, a maximum load of two pipes can be transported until the area to applied, what leads to lower productivity and higher risk due to the increase of trips by heavy load trucks. As an alternative to regular concrete, the Pipe Sak System was adopted and such method improved productivity and decreased discontinuities. (author)

  17. Fatigue evaluation of piping systems with limited vibration test data

    International Nuclear Information System (INIS)

    Huang, S.N.

    1990-11-01

    The safety-related piping in a nuclear power plant may be subjected to pump- or fluid-induced vibrations that, in general, affect only local areas of the piping systems. Pump- or fluid-induced vibrations typically are characterized by low levels of amplitudes and a high number of cycles over the lifetime of plant operation. Thus, the resulting fatigue damage to the piping systems could be an important safety concern. In general, tests and/or analyses are used to evaluate and qualify the piping systems. Test data, however, may be limited because of lack of instrumentation in critical piping locations and/or because of difficulty in obtaining data in inaccessible areas. This paper describes and summarizes a method to use limited pipe vibration test data, along with analytical harmonic response results from finite-element analyses, to assess the fatigue damage of nuclear power plant safety-related piping systems. 5 refs., 2 figs., 11 tabs

  18. Leakage analysis of fuel gas pipe in large LNG carrier engine room

    Directory of Open Access Journals (Sweden)

    CEN Zhuolun

    2017-10-01

    Full Text Available [Objectives] The electric propulsion dual-fuel engine is becoming dominant in newly built Liquefied Natural Gas(LNGcarriers. To avoid the potential risks that accompany the use of flammable and explosive boil-off gas,the performance of precise safety and reliability assessments is indispensable. [Methods] This research concerns the engine rooms of large LNG carriers which are propelled electrically by a dual-fuel engine. Possible fuel gas(natural gasleak cases in different areas of the engine room are simulated and analyzed. Five representative leak cases defined by leak form,leak location and leak rate are entered into a Computational Fluid Dynamics(CFDsimulation,in which the Reynolds stress model of Fluent software is adopted as the turbulence model. The results of the leaked gas distribution and ventilation velocity field are analyzed in combination to obtain the diffusion tendency and concentration distribution of leaked gas in different areas.[Results] Based on an analysis of the results,an optimized arrangement of flammable gas detectors is provided for the engine room, and the adoption of an explosion-proof exhaust fan is proven to be unnecessary.[Conclusions] These analysis methods can provide a reference for similar gas leakage scenarios occurring in confined ventilated spaces. In addition, the simulation results can be used to quantitatively assess potential fire or explosion damage in order to guide the design of structural reinforcements.

  19. Development of laser cladding technology for maintenance of pipe wall thinning

    International Nuclear Information System (INIS)

    Terada, Takaya; Nishimura, Akihiko; Oka, Kiyoshi

    2011-01-01

    We are developing the laser welding and cladding device for the maintenance of heat exchanger pipes. In the case of flow accelerated corrosion where pipe wall thinning occurred after a long time operation, laser cladding is mostly expected. A laser processing head was proposed in order to access the pipe wall. A composite-type optical fiber scope was used for real time observation and laser processing. An air-cooled compact fiber laser was used for spot heating. We present the concept of the laser cladding device which have the following features: 1) Wire feeding modules, 2) Module capable of laser irradiation in the vertical heat exchanger pipe, 3) Assist gas injection module. (author)

  20. Calculation of piping loads due to filling procedures

    International Nuclear Information System (INIS)

    Swidersky, Harald; Thiele, Thomas

    2012-01-01

    Filling procedures in piping systems are usually not load cases that are studied by fluid dynamic and structure dynamic analyses with respect to the integrity of pipes and supports. Although, their frequency is higher than that of postulated accidental transients, therefore they have to be considered for fatigue analyses. The piping and support loads due to filling procedures are caused by the density differences if the transported fluids, for instance in flows with the transport of gas bubbles. The impact duration of the momentum forces is defined by the flow velocity and the length of discontinuities in the piping segments. Filling procedures end very often with a shock pressure, caused by the impact and decelerating of the fluid front at smaller cross sections. The suitability of the thermally hydraulics program RELAP/MOD3.3 for the calculation of realistic loads from filling procedures was studied, the results compared with experimental data. It is shown that dependent on the discretization level the loads are partial significantly underestimated.

  1. Crack initiation through vibration fatigue of small-diameter pipes

    International Nuclear Information System (INIS)

    Comby, R.; Thebault, Y.; Papaconstantinou, T.

    2002-01-01

    Socket welds are used extensively for small bore piping connections in nuclear power plant systems. Numerous fatigue-related failures occurred in the past ten years mainly on safeguard systems and continue to occur frequently, showing that corrective actions did not take into account all aspects of the problem. Destructive examination of cracked small bore piping connections allowed a better understanding of failure mechanisms and a prediction of crack initiation site depending on nozzle fittings such as run pipe and small bore pipe thickness. A three-dimensional finite element model confirmed the conclusions of the lab examinations. For thick run pipes, it was shown that the failure tend to initiate predominantly at the socket weld toe or at the root, depending on the respective thickness of coupling and small bore pipe. Some additional studies, based on RSE-M code, are in progress in order to determine the maximum stresses location. Lessons learned through these investigations led to optimise the in-service inspection scope and to define solutions to be carried out to prevent failure of ''susceptible'' small bore pipe connections. Since July 2000, a large program is in progress to select all ''susceptible'' small bore pipes in safety-related systems and to apply corrective measures such as piping modifications or system operational modifications. (authors)

  2. Recoverying device for sodium vapor in inert gas

    Energy Technology Data Exchange (ETDEWEB)

    Nakagawa, Tamotsu; Nagashima, Ikuo

    1992-11-06

    A multi-pipe type heat exchanger for cooling an inert gas and a mist trap connected to the inert gas exit of the heat exchanger are disposed. A mist filter having bottomed pipes made of an inert gas-permeable sintered metal is disposed in the mist trap, and an inert gas discharge port is disposed at the upper side wall. With such a constitution, a high temperature inert gas containing sodium vapors can be cooled efficiently by the multi-pipe type heat exchanger capable of easy temperature control, thereby converting sodium vapors into mists, and the inert gas containing sodium mists can be flown into the mist trap. Sodium mists are collected by the mist filter and sodium mists flown down are discharged from the discharge port. With such procedures, a great amount of the inert gas containing sodium vapors can be processed continuously. (T.M.).

  3. Gas in Andean countries

    International Nuclear Information System (INIS)

    Campos Pinzon, Rafael

    2000-01-01

    The paper explores aspects of gas integration among Colombia, Venezuela, Ecuador and Peru. A comparison of the GDP is made, gas reserves are provided and the existent nets of gas-pipe are included in Colombia and Venezuela

  4. Application of tearing modulus stability concepts to nuclear piping. Final report. [PWR; BWR

    Energy Technology Data Exchange (ETDEWEB)

    Cotter, K.H.; Chang, H.Y.; Zahoor, A.

    1982-02-01

    The recently developed tearing modulus stability concept was successfully applied to several boiling water reactor (BWR) and pressurized water reactor (PWR) piping systems. Circumferentially oriented through-the-thickness cracks were postulated at numerous locations in each system. For each location, the simplified tearing stability methods developed in USNRC Report NUREG/CR-0838 were used to determine crack stability. The J-T diagram was used to present the results of the computations. The piping systems considered included Type 304 stainless steel as well as A106 carbon steel materials. These systems were analyzed using the piping analysis computer code MINK.

  5. Characteristics of coupled acoustic wave propagation in metal pipe

    International Nuclear Information System (INIS)

    Kim, Ho Wuk; Kim, Min Soo; Lee, Sang Kwon

    2008-01-01

    The circular cylinder pipes are used in the many industrial areas. In this paper, the acoustic wave propagation in the pipe containing gas is researched. First of all, the theory for the coupled acoustic wave propagation in a pipe is investigated. Acoustic wave propagation in pipe can not be occurred independently between the wave of the fluid and the shell. It requires complicated analysis. However, as a special case, the coupled wave in a high density pipe containing a light density medium is corresponded closely to the uncoupled in-vacuo shell waves and to the rigid-walled duct fluid waves. The coincidence frequencies of acoustic and shell modes contribute to the predominant energy transmission. The coincidence frequency means the frequency corresponding to the coincidence of the wavenumber in both acoustic and shell. In this paper, it is assumed that the internal medium is much lighter than the pipe shell. After the uncoupled acoustic wave in the internal medium and uncoupled shell wave are considered, the coincidence frequencies are found. The analysis is successfully confirmed by the verification of the experiment using the real long steel pipe. This work verifies that the coupled wave characteristic of the shell and the fluid is occurred as predominant energy transmission at the coincidence frequencies

  6. Piping structural design for the ITER thermal shield manifold

    Energy Technology Data Exchange (ETDEWEB)

    Noh, Chang Hyun, E-mail: chnoh@nfri.re.kr [ITER Korea, National Fusion Research Institute, Daejeon 305-333 (Korea, Republic of); Chung, Wooho, E-mail: whchung@nfri.re.kr [ITER Korea, National Fusion Research Institute, Daejeon 305-333 (Korea, Republic of); Nam, Kwanwoo; Kang, Kyoung-O. [ITER Korea, National Fusion Research Institute, Daejeon 305-333 (Korea, Republic of); Bae, Jing Do; Cha, Jong Kook [Korea Marine Equipment Research Institute, Busan 606-806 (Korea, Republic of); Kim, Kyoung-Kyu [Mecha T& S, Jinju-si 660-843 (Korea, Republic of); Hamlyn-Harris, Craig; Hicks, Robby; Her, Namil; Jun, Chang-Hoon [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St. Paul Lez Durance Cedex (France)

    2015-10-15

    Highlights: • We finalized piping design of ITER thermal shield manifold for procurement. • Support span is determined by stress and deflection limitation. • SQP, which is design optimization method, is used for the pipe design. • Benchmark analysis is performed to verify the analysis software. • Pipe design is verified by structural analyses. - Abstract: The thermal shield (TS) provides the thermal barrier in the ITER tokamak to minimize heat load transferred by thermal radiation from the hot components to the superconducting magnets operating at 4.2 K. The TS is actively cooled by 80 K pressurized helium gas which flows from the cold valve box to the cooling tubes on the TS panels via manifold piping. This paper describes the manifold piping design and analysis for the ITER thermal shield. First, maximum allowable span for the manifold support is calculated based on the simple beam theory. In order to accommodate the thermal contraction in the manifold feeder, a contraction loop is designed and applied. Sequential Quadratic Programming (SQP) method is used to determine the optimized dimensions of the contraction loop to ensure adequate flexibility of manifold pipe. Global structural behavior of the manifold is investigated when the thermal movement of the redundant (un-cooled) pipe is large.

  7. City gas supply management system. Toshi gas kyokyu kanri system

    Energy Technology Data Exchange (ETDEWEB)

    Ota, S [Tokyo Gas Co. Ltd., Tokyo (Japan)

    1991-07-05

    Supply and control system of city gas (about 90% is LNG) at Tokyo Gas Company is summarized. The LNG is delivered from the high pressure, A-middle pressure and B-middle pressure stations through the low pressure governors at about 3,000 locations to the low-pressure conduit networks. The information system department uses a large-size general purpose IBM computer as a host computer, control computers at each station, and communication networks consisted mainly of the in-house wireless networks. The trunk lines are all looped, and the important facilities are dualized. Characteristic functions include the supply prediction, which takes into account the past supply and ambient temperature records, a day of the week for a particular date, and demand fluctuation trends; adjustments of each holder based on the prediction and restrictions; and piping network simulation to decide gas manufacturing patterns, and determine reasonability of local construction of complicated conduits. The monitoring and control system as the central nerve includes a quick block-wide operation at an accident from earthquake and the like to prevent wide area disasters. 8 figs., 1 tab.

  8. A study on ultrasonic inspection of long steel pipes using lamb waves

    International Nuclear Information System (INIS)

    Park, Moon Ho

    1996-02-01

    An ultrasonic inspection technique with use of Lamb waves was evaluated to detect and determine the exact location of flaws present in long steel pipes. Since multiple modes of Lamb waves are generated in the inspected pipes due to their dispersive characteristics, selection of a specific Lamb wave mode is very important for inspection of flaws. Experimental studies of flaw detectability with use of each Lamb wave mode, namely, A 0 , S 0 , A 1 , and S 1 mode and their ultrasonic attenuation characteristics were conducted. Experimental results showed that A 0 mode is the most effective for detection and exact determination of the location of flaws. A lucite wedge containing water column that generates the A 0 Lamb wave mode was developed and used in the present inspection study. It was found that the ultrasonic beam divergence after its wrapping around once the inspected pipe interferes with exact determination of the location of flaws and that maximum reflection signals are obtained when the transducer is located axially offset from the straight line with the position of the flaw. The present study showed feasibility of ultrasonic inspection with use of Lamb waves for detection of flaws in several meters long insulated or inaccessible steel pipes

  9. SEALING LARGE-DIAMETER CAST-IRON PIPE JOINTS UNDER LIVE CONDITIONS

    Energy Technology Data Exchange (ETDEWEB)

    Kiran M. Kothari; Gerard T. Pittard

    2005-01-01

    Utilities in the U.S. operate over 75,000 km (47,000 miles) of old cast-iron pipes for gas distribution. The bell-and-spigot joints that connect pipe sections together tend to leak as these pipes age. Current repair practices are costly and highly disruptive. The objective of this program is to design, test and commercialize a robotic system capable of sealing multiple cast-iron bell and spigot joints from a single pipe entry point. The proposed system will perform repairs while the pipe remains in service by traveling through the pipe, cleaning each joint surface, and installing a stainless-steel sleeve lined with an epoxy-impregnated felt across the joint. This approach will save considerable time and labor, avoid traffic disruption, and eliminate any requirement to interrupt service to customers (which would result in enormous expense to utilities). Technical challenges include: (1) repair sleeves must compensate for diametric variation and eccentricity of cast-iron pipes; (2) the assembly must travel long distances through pipes containing debris; (3) the pipe wall must be effectively cleaned in the immediate area of the joint to assure good bonding of the sleeve; and (4) an innovative bolt-on entry fitting is required to conduct repair operations on live mains. The development effort is divided into eleven tasks. Task 1 (Program Management) and Task 2 (Establishment of Detailed Design Specifications) were completed in prior quarters while Task 3 (Design and Fabricate Ratcheting Stainless-Steel Repair Sleeves) has progressed to installing prototype sleeves in cast-iron test pipe segments. Efforts in the current quarter continued to focus on Tasks 4-8. Highly valuable lessons were learned from field tests of the 4-inch gas pipe repair robot in cast-iron pipe at Public Service Electric & Gas. (These field tests were conducted and reported last quarter.) These tests identified several design issues which need to be implemented in both the small- and large

  10. SEALING LARGE-DIAMETER CAST-IRON PIPE JOINTS UNDER LIVE CONDITIONS

    Energy Technology Data Exchange (ETDEWEB)

    Kiran M. Kothari; Gerard T. Pittard

    2004-11-01

    Utilities in the U.S. operate over 75,000 km (47,000 miles) of old cast-iron pipes for gas distribution. The bell-and-spigot joints that connect pipe sections together tend to leak as these pipes age. Current repair practices are costly and highly disruptive. The objective of this program is to design, test and commercialize a robotic system capable of sealing multiple castiron bell and spigot joints from a single pipe entry point. The proposed system will perform repairs while the pipe remains in service by traveling through the pipe, cleaning each joint surface, and installing a stainless-steel sleeve lined with an epoxy-impregnated felt across the joint. This approach will save considerable time and labor, avoid traffic disruption, and eliminate any requirement to interrupt service to customers (which would result in enormous expense to utilities). Technical challenges include: (1) repair sleeves must compensate for diametric variation and eccentricity of cast-iron pipes; (2) the assembly must travel long distances through pipes containing debris; (3) the pipe wall must be effectively cleaned in the immediate area of the joint to assure good bonding of the sleeve; and (4) an innovative bolt-on entry fitting is required to conduct repair operations on live mains. The development effort is divided into eleven tasks. Task 1 (Program Management) and Task 2 (Establishment of Detailed Design Specifications) were completed in prior quarters while Task 3 (Design and Fabricate Ratcheting Stainless-Steel Repair Sleeves) has progressed to installing prototype sleeves in cast iron test pipe segments. Efforts in this quarter continued to focus on Tasks 4-8, with significant progress made in each as well as field testing of the 4-inch gas pipe repair robot in cast iron pipe at Public Service Electric & Gas. The field tests were conducted August 23-26, 2004 in Oradell, New Jersey. The field tests identified several design issues which need to be implemented in both the small

  11. Gas retorts: gas manufacture, process for distillation, destructive

    Energy Technology Data Exchange (ETDEWEB)

    Bell, J

    1874-05-23

    In apparatus for distilling shale, coal, etc. for making oil and gas, tubular retorts are supported horizontally in a chamber by plates from a brick setting and are heated partly by jets of gas from a pipe supplied through a cock from a gas holder, and partly by the waste gases from a furnace, which heats gas retorts placed in a chamber, air being supplied beneath the grate by a fan.

  12. Gas-Induced Water-hammer Loads Calculation for Safety Related Systems

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Seungchan; Yoon, Dukjoo [Korea Hydro and Nuclear Power Co., LTd, Daejeon (Korea, Republic of); Lee, Dooyong [Seoul National Univ., Seoul (Korea, Republic of)

    2013-05-15

    Of particular interest, gas accumulation can result in system pressure transient in pump discharge piping following a pump start. Consequently, this evolves into a gas-water, a water-hammer event and the accompanying force imbalances on the piping segments can be sufficient to challenge the piping supports and restraint. This paper describes an method performing to the water-hammer loads to determine the maximum loading that would occur in the piping system following the safety injection signal and to evaluate its integrity. For a given gas void volumes in the discharge piping, the result of the calculation shows the maximum loads of 18,894.2psi, which is smaller than the allowable criteria. Also, the maximum peak axial force imbalances acting on the support is 1,720lbf as above.

  13. Gas-Induced Water-hammer Loads Calculation for Safety Related Systems

    International Nuclear Information System (INIS)

    Lee, Seungchan; Yoon, Dukjoo; Lee, Dooyong

    2013-01-01

    Of particular interest, gas accumulation can result in system pressure transient in pump discharge piping following a pump start. Consequently, this evolves into a gas-water, a water-hammer event and the accompanying force imbalances on the piping segments can be sufficient to challenge the piping supports and restraint. This paper describes an method performing to the water-hammer loads to determine the maximum loading that would occur in the piping system following the safety injection signal and to evaluate its integrity. For a given gas void volumes in the discharge piping, the result of the calculation shows the maximum loads of 18,894.2psi, which is smaller than the allowable criteria. Also, the maximum peak axial force imbalances acting on the support is 1,720lbf as above

  14. Capacitance probe for detection of anomalies in non-metallic plastic pipe

    Science.gov (United States)

    Mathur, Mahendra P.; Spenik, James L.; Condon, Christopher M.; Anderson, Rodney; Driscoll, Daniel J.; Fincham, Jr., William L.; Monazam, Esmail R.

    2010-11-23

    The disclosure relates to analysis of materials using a capacitive sensor to detect anomalies through comparison of measured capacitances. The capacitive sensor is used in conjunction with a capacitance measurement device, a location device, and a processor in order to generate a capacitance versus location output which may be inspected for the detection and localization of anomalies within the material under test. The components may be carried as payload on an inspection vehicle which may traverse through a pipe interior, allowing evaluation of nonmetallic or plastic pipes when the piping exterior is not accessible. In an embodiment, supporting components are solid-state devices powered by a low voltage on-board power supply, providing for use in environments where voltage levels may be restricted.

  15. MATHEMATICAL AND INFORMATION SUPPORT FOR CALCULATION AND DESIGN OF TUBE GAS HEATERS LOCATED IN STRUCTURES

    Directory of Open Access Journals (Sweden)

    CHORNOMORETS H. Y.

    2016-02-01

    Full Text Available Raising of problem. For the design and construction of tube gas heaters in building structures to need solve the problems of analysis and synthesis of such heating system. The mathematical model of this system is consists of: mathematical model of the tube gas heater, mathematical model of heat distribution in the building structure and corresponding boundary conditions. To solve the tasks of analysis and synthesis must be appropriate mathematical and information support. Purpose. The purpose of this paper is to describe the developed mathematical and information support that solve the problems of analysis and synthesis of heating systems with gas tube heaters, located in building constructions.Conclusion. Mathematical support includes the development of algorithms and software for the numerical solution of problems analysis and synthesis heating system. Information support includes all the necessary parameters characterizing the thermal properties of materials which used in the heating system, and the parameters characterizing the heat exchange between the coolant and components of the heating system. It was developed algorithms for solving problems of analysis and synthesis heating system with tube gas heater located in structures to use evolutionary search algorithm and software. It was made experimental study and was obtained results allow to calculate the heat transfer from the gas-air mixture to the boundary surface of the building structure. This results and computation will provide full information support for solving problems of analysis and synthesis of the heating system. Was developed mathematical and software support, which allows to solve the problems of analysis and synthesis heating systems with gas tube heaters, located in building structures. Tube gas heaters located in the building structures allows with small capital expenditures to provide space heating. Is necessary to solve the problems of analysis (calculation and

  16. An elevator for locked drilling pipes

    Energy Technology Data Exchange (ETDEWEB)

    Gurbanov, R.S.; Abbasov, E.M.; Ismailov, A.A.; Mamedov, Yu.S.; Safarov, A.A.

    1983-01-01

    An elevator is proposed, which includes a body with a door. To reduce the probability of gas shows in a well with high speed lowering and lifting of the column of locked drilling pipes through providing the possibility of feeding a drilling mud in this case into the mine, the elevator is equipped with a pneumatic cylinder with a two way hollow rod, on one face of which a sealing element is mounted for sealing the drilling pipe and on the other, an adapter for feeding the drilling mud. The rod is linked with the sleeve of the pneumatic cylinder, which is rigidly linked with the body with the capability of axial movement without rotation.

  17. LHCb celebrates completion of its beam pipe

    CERN Multimedia

    2007-01-01

    Members of the LHCb collaboration and of the AT and TS Departments are ready to pop open the champagne bottles and celebrate the complete installation and commissioning of the LHCb experiment’s beam pipe. Members of the LHCb collaboration and of the AT and TS Departments gather near the newly completed beam pipe in the foreground. All four sections of LHCb’s beam pipe have been installed, interconnected, pumped down and baked out.. Three of the conical tubes are made of beryllium in order to minimize the level of background in the experiment, while the fourth and largest section is composed of stainless steel. The first of the beryllium sections, an important connection to the Vertex Locator vacuum vessel (VELO) was installed in August 2006 (see Bulletin No. 37/2006). One of the more challenging tasks was the installation of the longest (6 m) piece of beryllium beam pipe through the 2.4 m long RICH2 detector in January 2006. Deli...

  18. 1956 : the year of the pipe

    International Nuclear Information System (INIS)

    Anon.

    2008-01-01

    In 1956, Westcoast Transmission Company Limited announced that it would build a 650-mile export pipeline through British Columbia. However, the project faced several delays due to extremely high costs. It was the efforts of Trans-Canada Pipe Lines Limited to recruit supply contracts that laid the foundation for the system that would eventually deliver nearly 800 million cubic feet of gas per day to consumers in eastern Canada and the United States. Trans-Canada's favoured plan was to build east to Winnipeg, then south into the United States, allowing western Canadian gas to serve U.S. markets, while gas imported from the U.S. would serve markets in eastern Canada. However, the federal transport minister insisted on an all-Canadian route which forced Trans-Canada to build across the Canadian Shield, significantly increasing construction costs. Since American investors did not want any part of the new plan, a compromise was reached whereby Trans-Canada would build the Alberta-Winnipeg segment with financial aid from the federal government. The segment east from Winnipeg would also be financed from the federal government to serve markets in Ontario and Montreal, but the section would be leased back to Trans-Canada. Other key events in 1956 included construction of the gathering system by Alberta Gas Trunk Line Limited; plans for Interprovincial Pipe Line Limited to build an extension from Sarnia to Toronto; and, the beginning of development drilling by Imperial Oil at Norman Wells. 1 tab., 1 fig

  19. Performance Measurements of a 7 mm-Diameter Hydrogen Heat Pipe

    International Nuclear Information System (INIS)

    Abdel-Bary, M.; Abdel-Samad, S.; Kiliana, K.; Ritman, J.; Abdel-Bary, M.; Abdel-Samad, S.

    2008-01-01

    A gravity assisted heat pipe with 7-mm diameter has been developed and tested to cool a liquid hydrogen target for extracted beam experiments at COSY. The liquid flowing down from the condenser surface is separated from the vapor flowing up by a thin wall 3 mm diameter plastic tube located concentrically inside the heat pipe. The heat pipe was tested at different inclination angles with respect to the horizontal plane. The heat pipe showed good operating characteristics because of the low radiation heat load from the surroundings, low heat capacity due to the small mass, higher sensitivity to heat loads (to overcome the heat load before the complete vaporization of the liquid in the target cell) due to the higher vapor speed inside the heat pipe which transfers the heat load to the condenser

  20. Optimal sensor locations for the backward Lagrangian stochastic technique in measuring lagoon gas emission

    Science.gov (United States)

    This study evaluated the impact of gas concentration and wind sensor locations on the accuracy of the backward Lagrangian stochastic inverse-dispersion technique (bLS) for measuring gas emission rates from a typical lagoon environment. Path-integrated concentrations (PICs) and 3-dimensional (3D) wi...

  1. Pipe whip: a summary of the damage observed in BNL pipe-on-pipe impact tests

    International Nuclear Information System (INIS)

    Baum, M.R.

    1987-01-01

    This paper describes examples of the damage resulting from the impact of a whipping pipe on a nearby pressurised pipe. The work is a by-product of a study of the motion of a whipping pipe. The tests were conducted with small-diameter pipes mounted in rigid supports and hence the results are not directly applicable to large-scale plant applications where flexible support mountings are employed. The results illustrate the influence of whipping pipe energy, impact position and support type on the damage sustained by the target pipe. (author)

  2. Automatic seismic support design of piping system by an object oriented expert system

    International Nuclear Information System (INIS)

    Nakatogawa, T.; Takayama, Y.; Hayashi, Y.; Fukuda, T.; Yamamoto, Y.; Haruna, T.

    1990-01-01

    The seismic support design of piping systems of nuclear power plants requires many experienced engineers and plenty of man-hours, because the seismic design conditions are very severe, the bulk volume of the piping systems is hyge and the design procedures are very complicated. Therefore we have developed a piping seismic design expert system, which utilizes the piping design data base of a 3 dimensional CAD system and automatically determines the piping support locations and support styles. The data base of this system contains the maximum allowable seismic support span lengths for straight piping and the span length reduction factors for bends, branches, concentrated masses in the piping, and so forth. The system automatically produces the support design according to the design knowledge extracted and collected from expert design engineers, and using design information such as piping specifications which give diameters and thickness and piping geometric configurations. The automatic seismic support design provided by this expert system achieves in the reduction of design man-hours, improvement of design quality, verification of design result, optimization of support locations and prevention of input duplication. In the development of this system, we had to derive the design logic from expert design engineers and this could not be simply expressed descriptively. Also we had to make programs for different kinds of design knowledge. For these reasons we adopted the object oriented programming paradigm (Smalltalk-80) which is suitable for combining programs and carrying out the design work

  3. Selenide isotope generator for the Galileo Mission. Axially-grooved heat pipe: accelerated life test results

    International Nuclear Information System (INIS)

    1979-08-01

    The results through SIG/Galileo contract close-out of accelerated life testing performed from June 1978 to June 1979 on axially-grooved, copper/water heat pipes are presented. The primary objective of the test was to determine the expected lifetime of axially-grooved copper/water heat pipes. The heat pipe failure rate, due to either a leak or a build-up of non-condensible gas, was determined. The secondary objective of the test was to determine the effects of time and temperature on the thermal performance parameters relevant to long-term (> 50,000 h) operation on a space power generator. The results showed that the gas generation rate appears to be constant with time after an initial sharp rise although there are indications that it drops to approximately zero beyond approx. 2000 h. During the life test, the following pipe-hours were accumulated: 159,000 at 125 0 C, 54,000 at 165 0 C, 48,000 at 185 0 C, and 8500 at 225 0 C. Heated hours per pipe ranged from 1000 to 7500 with an average of 4720. Applying calculated acceleration factors yields the equivalent of 930,000 pipe-h at 125 0 C. Including the accelerated hours on vendor tested pipes raises this number to 1,430,000 pipe-hours at 125 0 C. It was concluded that, for a heat pipe temperature of 125 0 C and a mission time of 50,000 h, the demonstrated heat pipe reliability is between 80% (based on 159,000 actual pipe-h at 125 0 C) and 98% (based on 1,430,000 accelerated pipe-h at 125 0 C). Measurements indicate some degradation of heat transfer with time, but no detectable degradation of heat transport

  4. Pipe support

    International Nuclear Information System (INIS)

    Pollono, L.P.

    1979-01-01

    A pipe support for high temperature, thin-walled piping runs such as those used in nuclear systems is described. A section of the pipe to be suppported is encircled by a tubular inner member comprised of two walls with an annular space therebetween. Compacted load-bearing thermal insulation is encapsulated within the annular space, and the inner member is clamped to the pipe by a constant clamping force split-ring clamp. The clamp may be connected to pipe hangers which provide desired support for the pipe

  5. Prediction of fan assisted flow in a duct/pipe network

    International Nuclear Information System (INIS)

    Quraishi, M.S.

    1996-01-01

    The commonly used fan+duct model is usually based on a table generated by matching the fan and system characteristic curves with the applied pressure drop across the fan+duct/pipe network and using linear or polynomial interpolation for intermediate values. However, this empirical approach can only handle a single system configuration for each table. If this approach is replaced by an algebraic formulation a general and flexible model can be developed. The algebraic model will be able to account for failure of resistances in the duct/pipe system as well as the failure of duct/pipe at an intermediate location. This paper presents the development of an algebraic model for fan+duct/pipe systems. (author)

  6. A method to assign failure rates for piping reliability assessments

    International Nuclear Information System (INIS)

    Gamble, R.M.; Tagart, S.W. Jr.

    1991-01-01

    This paper reports on a simplified method that has been developed to assign failure rates that can be used in reliability and risk studies of piping. The method can be applied on a line-by-line basis by identifying line and location specific attributes that can lead to piping unreliability from in-service degradation mechanisms and random events. A survey of service experience for nuclear piping reliability also was performed. The data from this survey provides a basis for identifying in-service failure attributes and assigning failure rates for risk and reliability studies

  7. Pipe Explorer{trademark} surveying system. Innovative technology summary report

    Energy Technology Data Exchange (ETDEWEB)

    1999-06-01

    The US Department of Energy`s (DOE) Chicago Operations Office and the DOE`s Federal Energy Technology Center (FETC) developed a Large Scale Demonstration Project (LSDP) at the Chicago Pile-5 Research Reactor (CP-5) at Argonne National Laboratory-East (ANL). The objective of the LSDP is to demonstrate potentially beneficial decontamination and decommissioning (D and D) technologies in comparison with current baseline technologies. The Pipe Explorer{trademark} system was developed by Science and Engineering Associates, Inc. (SEA), Albuquerque, NM as a deployment method for transporting a variety of survey tools into pipes and ducts. Tools available for use with the system include alpha, beta and gamma radiation detectors; video cameras; and pipe locator beacons. Different versions of this technology have been demonstrated at three other sites; results of these demonstrations are provided in an earlier Innovative Technology Summary Report. As part of a D and D project, characterization radiological contamination inside piping systems is necessary before pipes can be recycled, remediated or disposed. This is usually done manually by surveying over the outside of the piping only, with limited effectiveness and risk of worker exposure. The pipe must be accessible to workers, and embedded pipes in concrete or in the ground would have to be excavated at high cost and risk of exposure to workers. The advantage of the Pipe Explorer is its ability to perform in-situ characterization of pipe internals.

  8. An analysis of headquarters location in the Canadian oil and gas sector

    International Nuclear Information System (INIS)

    Hirsch, K.T.

    1993-04-01

    Headquarters location theory identifies several factors which are expected to influence the location of corporate head offices. Some of these factors directly affect the costs of operation and the basic profitability of the company, such as the cost of office space, tax levels, availability of qualified labour, cost of labour, proximity to corporate activities, and agglomeration with other services and companies. Headquarters location theory is applied to Canada's energy sector. During the previous 27 years, concentration of energy company headquarters has shifted from Toronto to Calgary. A regression model tests the extent to which those factors identified in the literature appear to be statistically significant for the headquarters relocation experience in Canada's energy sector. The results of the tests suggest that certain factors do appear to significantly influence relocation decisions. These factors are agglomeration with other oil and gas companies, and relative proximity to oil and gas operations (which unexpectedly displayed a negative coefficient). The agglomeration factor was by far the most significant. 44 refs., 3 figs., 2 tabs

  9. Whistling of pipes with narrow corrugations: scale model tests and consequences for carcass design

    NARCIS (Netherlands)

    Golliard, J.; Belfroid, S.P.C.; Bendiksen, E.; Frimodt, C.

    2013-01-01

    Pipes for gas production and transport with a corrugated inner surface, as used in flexible pipes, can be subject to Flow-Induced Pulsations when the flow velocity is larger than a certain velocity. This onset velocity is dependent on the geometry of the corrugations, the operational conditions and

  10. Mouse-resistant insulated covers keep pipes from freezing

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2010-01-15

    Fabric wellhead covers and insulated blankets are commonly used at well sites in the Wyoming coalbed methane field to keep surface pipes from freezing. These materials are often chewed up by mice who build nests close to the warm pipes. The mice attract rattlesnakes, a potentially serious problem for the workmen who check the wells daily. Kennon Products of Sheridan, Wyoming solved this problem by making a flexible covering material that has a coating of hardened guard plates that prevents mice from chewing through it. More than a hundred of Kennon's mouse-resistant wellhead covers have been used successfully in the gas fields for over a year. They can be installed in less than 30 minutes and cost only a fraction of what a fiberglass hut costs to purchase and install. Huts are being discouraged for use on federal lands because they alter the nesting patterns of eagles, who perch upon them to hunt rodents. Huts also trap methane gas, which is a potential safety hazard. Kennon's mouse-resistant wellhead covers are lower than the fiberglass huts and blend into the landscape. The company is working on camouflage colours to make wellheads less noticeable. In the future, the company plans to insulate water pipes. 1 fig.

  11. Innovative technology summary report: High-speed clamshell pipe cutter

    International Nuclear Information System (INIS)

    1998-09-01

    The Hanford Site C Reactor Technology Demonstration Group demonstrated the High-Speed Clamshell Pipe Cutter technology, developed and marketed by Tri Tool Inc. (Rancho Cordova, California). The models demonstrated are portable, split-frame pipe lathes that require minimal radial and axial clearances for severing and/or beveling in-line pipe with ranges of 25 cm to 41 cm and 46 cm to 61 cm nominal diameter. The radial clearance requirement from the walls, floors, or adjacent pipes is 18 cm. The lathes were supplied with carbide insert conversion kits for the cutting bits for the high-speed technique that was demonstrated. Given site-specific factors, this demonstration showed the cost of the improved technology to be approximately 30% higher than the traditional (baseline) technology (oxyacetylene torch) cost of $14,400 for 10 cuts of contaminated 41-cm and 61-cm-diameter pipe at C Reactor. Actual cutting times were faster than the baseline technology; however, moving/staging the equipment took longer. Unlike the baseline torch, clamshell lathes do not involve applied heat, flames, or smoke and can be operated remotely, thereby helping personal exposures to be as low as reasonably achievable. The baseline technology was demonstrated at the C Reactor north and south water pipe tunnels August 19--22, 1997. The improved technology was demonstrated in the gas pipe tunnel December 15--19

  12. Field investigation on structural performance of the buried UPVC pipes with and without geogrid reinforcement

    Science.gov (United States)

    Teja, Akkineni Surya; Rajkumar, R.; Gokula Krishnan, B.; Aravindh, R.

    2018-02-01

    Buried pipes are used mainly for water supply and drainage besides many other applications such as oil, liquefied natural gas, coal slurries and mine tailings. The pipes used may be rigid (reinforced concrete, vitrified clay and ductile iron) or flexible (Steel, UPVC, aluminium, Fiber glass and High-density polyethylene) although the distinction between them is blurring. Flexible pipe design is governed by deflection or buckling. UPVC pipes are preferred due to light weight, long term chemical stability and cost efficiency. This project aims to study the load deformation behaviour of the buried pipe and stress variation across the cross section of the pipe under static loading along with the influence of depth of embedment, density of backfill on the deformation and stresses in pipe and the deformation behaviour of buried pipe when soil is reinforced with geogrid reinforcement and evaluate the structural performance of the pipe.

  13. Heat losses through pipe connections in hot water stores

    DEFF Research Database (Denmark)

    Andersen, Elsa; Fan, Jianhua; Furbo, Simon

    2007-01-01

    The heat loss from pipe connections at the top of hot water storage tanks with and without a heat trap is investigated theoretically and compared to similar experimental investigations. Computational Fluid Dynamics (CFD) is used for the theoretical analysis. The investigations show that the heat...... loss from an ideally insulated pipe connected to the top of a hot water tank is mainly due to a natural convection flow in the pipe, that the heat loss coefficient of pipes connected to the top of a hot water tank is high, and that a heat trap can reduce the heat loss coefficient significantly. Further......, calculations show that the yearly thermal performance of solar domestic hot water systems is strongly reduced if the hot water tank has a thermal bridge located at the top of the tank....

  14. K{sub I}-T estimation for embedded flaws in pipes - Part II: Circumferentially oriented cracks

    Energy Technology Data Exchange (ETDEWEB)

    Qian Xudong, E-mail: cveqx@nus.edu.s [Department of Civil Engineering, National University of Singapore, 1 Engineering Drive 2, Singapore 117576 (Singapore)

    2010-04-15

    This paper, in parallel to the investigation on axially embedded cracks reported in the companion paper, presents a numerical study on the linear-elastic K{sub I} and T-stress values over the front of elliptical cracks circumferentially embedded in the wall of a pipe/cylindrical structure, under a uniform pressure applied on the inner surface of the pipe. The numerical procedure employs the interaction-integral approach to compute the linear-elastic stress-intensity factor (SIF) K{sub I} and T-stress values for embedded cracks with practical sizes at different locations in the wall of the pipe. The parametric study covers a wide range of geometric parameters for embedded cracks in the pipe, including: the wall thickness to the inner radius ratio (t/R{sub i}), the crack depth over the wall thickness ratio (a/t), the crack aspect ratio (a/c) and the ratio of the distance from the centerline of the crack to the outer surface of the pipe over the pipe wall thickness (e{sub M}/t). The parametric investigation identifies a significant effect of the remaining ligament length on both the T-stress and K{sub I} values at the crack-front location (denoted by point O) nearest to the outer surface of the pipe and at the crack-front location (denoted by point I) nearest to the inner surface of the pipe. The numerical investigation establishes the database to derive approximate functions from a nonlinear curve-fitting procedure to predict the T-stress and K{sub I} values at three critical front locations of the circumferentially embedded crack in a pipe: points O, I and M. The proposed T-stress and K{sub I} functions utilize a combined second-order polynomial and a power-law expression, which presents a close agreement with the T-stress and K{sub I} values computed from the very detailed finite element models. The comparison between the circumferentially embedded crack and the axially embedded crack indicates that both the T-stress and K{sub I} values at crack-front points O and

  15. Remotely controlled repair of piping at Douglas Point

    International Nuclear Information System (INIS)

    Conrath, J.J.

    1983-06-01

    The 200 MWe Douglas Point Nuclear Generating Station which started operation in 1966 was Canada's first commercial nuclear power plant. In 1977, after 11 years of operation, leakage of heavy water was detected and traced to the Moderator Piping System (pipe sizes 19 mm to 76 mm) located in a vault below the reactor where the radiation fields during shutdown ranged up to 5000 R/Hr. Inspection using remotely operated TV cameras showed that a 'U' bolt clamp support had worn through the wall of one pipe and resulted in the leakage and also that wear was occurring on other pipes. An extensive repair plan was subsequently undertaken in the form of a joint venture of the designer-owner Atomic Energy of Canada Limited, and the builder-operator, Ontario Hydro. This paper describes the equipment and procedures used in remotely controlled repairs at Douglas Point

  16. A numerical analysis on thermal stratification phenomenon in the SCS piping

    International Nuclear Information System (INIS)

    Kim, Kwang Chu; Park, Man Heung; Youm, Hag Ki; Lee, Sun Ki; Kim, Tae Ryong

    2003-01-01

    A numerical study is performed to estimate on an unsteady thermal stratification phenomenon in the Shutdown Cooling System(SCS) piping branched off the Reactor Coolant System(RCS) piping of Nuclear Power Plant. In the results, turbulent penetration reaches to the 1 st isolation valve. At 500sec, the maximum temperature difference between top and bottom inner wall in piping is observed at the starting point of horizontal piping passing elbow. The temperature of coolant in the rear side of the 1 st isolation valve disk is very slowly increased and the inflection point in temperature difference curve for time is observed at 2700sec. At the beginning of turbulent penetration from RCS piping, the fast inflow generates the higher temperature for the inner wall than the outer wall in the SCS piping. In the case the hot-leg injection piping and the drain piping are connected to the SCS piping, the effect of thermal stratification in the SCS piping is decreased due to an increase of heat loss compared with no connection case. The hot-leg injection piping affected by turbulent penetration from the SCS piping has a severe temperature difference that exceeds criterion temperature stated in reference. But the drain piping located in the rear compared with the hot-leg injection piping shows a tiny temperature difference. In a viewpoint of designer, for the purpose of decreasing the thermal stratification effect, it is necessary to increase the length of vertical piping in the SCS piping, and to move the position of the hot-leg injection piping backward

  17. Dynamic response of piping system subject to flow acoustic excitation

    International Nuclear Information System (INIS)

    Wang, T.; Sun, Y.S.

    1988-01-01

    Through the use of a theoretically derived and test data-calibrated forcing function, the dynamic response of a piping system subject to flow-acoustic induced vibration is analyzed. It is shown that the piping behavior can be predicted when consideration is given to both the wall flexural vibration and the piping system vibration. Piping responded as a system to the transversal excitation due to the swirling motion of the fluid flow, as well as flexurally to the high-frequency acoustic excitations. The transverse piping system response was calculated using a lumped mass piping model. The piping model has more stringent requirements than its counterpart for waterhammer and seismic modeling due to the shorter spiral wavelength and higher frequency of the forcing function. Proper modeling ensured that both the moment stress caused by system excitation and the local stress induced by the support reaction load were properly accounted for. Flexural vibration not only poses a threat to nipples and branch connections, but also contributes substantially to the resultant total stress experienced by the pipe. The forcing function approach has the advantage that the critical locations on the piping system can be identified by means of analysis, facilitating surveillance and inspection, as well as fatigue evaluation

  18. Deposition of CsI aerosol in horizontal straight pipes in WIND project

    International Nuclear Information System (INIS)

    Sugimoto, J.; Maruyama, Y.; Igarashi, M.; Hidaka, A.; Maeda, A.; Harada, Y.; Hashimoto, K.

    1996-01-01

    In the WIND Project at Japan Atomic Energy Research Institute, the aerosol behaviors such as deposition, revaporization and resuspension have been investigated under the severe accident conditions. The present paper describes the deposition of CsI aerosol in horizontal straight pipes. The test results showed that the aerosol deposition depended on thermo-fluid dynamic characteristics of the carrier gas. In the test with the temperature gradient of the pipe, the deposition of CsI was remarkable within the downstream side, where the temperature of the gas was higher than that of the pipe wall. It is thus supposed that the major mechanism of the deposition was thermophoresis caused by the temperature gradient within the gas phase. However, circumferential distribution of the deposited CsI was influenced by the argon flow rate. In laminar flow case, larger amount of CsI was deposited on the ceiling than the floor area. Three-dimensional thermo-fluid dynamic analysis suggested that much sharper radial temperature gradient was developed within the gas near the ceiling area due to the formation of a natural convective secondary flow. This could result in the promotion of the thermophoretic aerosol deposition. On the other hand, slight circumferential distribution was observed in case of the high flow rate, probably due to a uniform temperature field. It was also found that the close coupling of the FP behavior and the detailed thermohydraulic analyses is essential in order to accurately predict the CsI deposition in the pipe. The findings on aerosol behaviors will also be utilized for the evaluation of sodium aerosol behaviors of fast reactors. (author)

  19. Choice of insulation standard for pipe networks in 4th generation district heating systems

    DEFF Research Database (Denmark)

    Lund, Rasmus Søgaard; Mohammadi, Soma

    2016-01-01

    and smart gas grids. Improving DH pipes by improving the insulation standard results in decreasing the heat and temperature losses from the pipe networks. When reducing heat losses from DH pipes, there is a trade-off between the increasing cost of pipe insulation and the associated savings in the heat...... supply system. This study presents a methodology to describe this balance for a specific case and its application for the case of Denmark. The methodology presented consists of a techno-economic analysis in two steps. In the first step, a DH grid model is used to assess the reduction in grid losses...

  20. Design and manufacture of ceramic heat pipes for high temperature applications

    International Nuclear Information System (INIS)

    Meisel, Peter; Jobst, Matthias; Lippmann, Wolfgang; Hurtado, Antonio

    2015-01-01

    Heat exchangers based on ceramic heat pipes were designed for use under highly abrasive and corrosive atmospheres at temperatures in the range of 800–1200 °C for high-temperature power-engineering applications. The presented heat pipes are gravity assisted and based on a multi-layer concept comprising a ceramic cladding and an inner metal tube that contains sodium as the working fluid. Hermetical encapsulation of the working fluid was achieved by electron-beam welding of the inner metal tube. Subsequently, closure of the surrounding ceramic tube was performed by laser brazing technology using a glass solder. Temperature resistance and functionality of the manufactured ceramic thermosyphons could be confirmed experimentally in a hot combustion gas atmosphere at temperatures up to 1100 °C. The ceramic tubes used had an outer diameter of 22 mm and a total length of 770 mm. The measured axial heat transfer of the ceramic gravity assisted heat pipes at the stationary operating point with cold/hot gas temperature of 100 °C/900 °C was 400 W. The result of the calculation using the created mathematical model amounted to 459 W. - Highlights: • Heat-pipe design consists of a ceramic shell and an inner metallic tube. • Laser brazing technology is suitable to seal ceramic heat-pipes. • Thermal characteristic of double wall thermosyphon was modelled using FEM code. • Experimental investigations demonstrated functionality of double wall thermosyphons

  1. Corrosion by sulfate-reducing bacteria in a HP gas line under a detached weld cladding; Korrosion durch sulfatreduzierende Bakterien an einer Hochdruckgasleitung unter abgeloester Schweissnahtnachumhuellung

    Energy Technology Data Exchange (ETDEWEB)

    Bette, Ulrich [Technische Akademie Wuppertal (Germany)

    2011-07-01

    Intelligent pig measurements detected several points of corrosion in a HP gas pipeline in northern Germany. Corrosion occurred in a pipe section buried in clay soil, under detached weld claddings. It was not detected in regular measurements and additional intensive measurements. When the pipes were dug up, sulfate-reducing bacteria were found as the cause of corrosion. Due to the location of the corrosion processes, cathodic protection was impossible, and IFO measurements were ineffective in the low-ohmic soil.

  2. Metallurgical analysis of high pressure gas pipelines rupture

    International Nuclear Information System (INIS)

    Hasan, F.; Ahmed, F.

    2007-01-01

    On 6 July 2004, two parallel-running gas pipelines (18-inch and 24-inch diameters), in the main transmission network of SNGPL (a gas company in Pakistan) were ruptured. The ruptures occurred in the early hours of the morning about 8 miles downstream of the compressor station AC-4. The ruptures were indicated by the increased gas flow at the outlet of AC-4 (1), first at about 0648 hours and then again about 20 minutes later. The gas escaping from the ruptured lines had caught fire, and the flames had also 'affected' a third parallel-running pipeline of 30-inch diameter, lying next to the 24-inch line. The metallurgical examination of the two ruptured lines showed that the 24-inch line was ruptured with the help of an explosive device that had been placed on the underside of the pipe. An examination of the 18-inch line showed that this pipe had failed as a result of the heating of the pipe-wall, presumably, by the flame emanating from the 24-inch line. These two observations clearly suggested that the 24-inch line was the first to rupture (by explosives), and the fire following this rupture had heated the 18-inch pipe to a temperature where its yield strength was unable to support the inside gas pressure. The 20 minutes time interval between the two ruptures was obviously the time taken by the 18 inch pipe to be heated upto the level where it started to yield. The 30-inch line lying next to the 24-inch line was affected to the extent that its coating had been burnt-off over a length of about 40-50 feet. However, the pipe did not exhibit any signs of deshaping or deformation what-so-ever. A replica metallographic examination indicated that the microstructure of the pipe was not measurably affected by the heat. It was thus decided not to replace the affected part of the 30-inch pipe, but only to re-coat this affected portion. (author)

  3. Determination of optimum insulation thickness in pipe for exergetic life cycle assessment

    International Nuclear Information System (INIS)

    Keçebaş, Ali

    2015-01-01

    Highlights: • It is aimed to determine optimum insulation thickness in pipe. • A new methodology is used as exergetic life cycle assessment for this purpose. • It is evaluated for various fuels, different pipe diameters and some combustion parameters. • This methodology is not suitable for determining optimum insulation thickness of a pipe. • There are benefits to our understanding of the need for insulation use in pipes. - Abstract: The energy saving and the environmental impacts’ reduction in the world building sector have gained great importance. Therefore, great efforts have been invested to create energy-saving green buildings. To do so, one of the many things to be done is the insulation of cylindrical pipes, canals and tanks. In the current study, the main focus is on the determination of the optimum insulation thickness of the pipes with varying diameters when different fuels are used. Therefore, through a new method combining exergy analysis and life cycle assessment, optimum insulation thickness of the pipes, total exergetic environmental impact, net saving and payback period were calculated. The effects of the insulation thickness on environmental and combustion parameters were analyzed in a detailed manner. The results revealed that optimum insulation thickness was affected by the temperature of the fuel when it enters into the combustion chamber, the temperature of the stack gas and the temperature of the combustion chamber. Under these optimum effects, the optimum insulation thickness of a 100 mm pipe was determined to be 55.7 cm, 57.2 cm and 59.3 cm for coal, natural gas and fuel–oil, respectively with the ratios of 76.32%, 81.84% and 84.04% net savings in the exergetic environmental impact. As the environmental impacts of the fuels and their products are bigger than those of the insulation material, the values of the optimum insulation thickness of the method used this study was found greater. Moreover, in the pipes with greater

  4. Flooding characteristics of gas-liquid two-phase flow in a horizontal U bend pipe

    International Nuclear Information System (INIS)

    Sakaguchi, T.; Hosokawa, S.; Fujii, Y.

    1995-01-01

    For next-generation nuclear reactors, hybrid safety systems which consist of active and passive safety systems have been planned. Steam generators with horizontal U bend pipelines will be used as one of the passive safety systems. It is required to clarify flow characteristics, especially the onset of flooding, in the horizontal U bend pipelines in order to examine their safety. Flooding in vertical pipes has been studied extensively. However, there is little study on flooding in the horizontal U bend pipelines. It is supposed that the onset of flooding in the horizontal U bend pipelines is different from that in vertical pipes. On the other hand, liquid is generated due to condensation of steam in pipes of the horizontal steam generators at the loss of coolant accident because the steam generators will be used as a condenser of a cooling system of steam from the reactor. It is necessary to simulate this situation by the supply of water at the middle of horizontal pipe. In the present paper, experiments were carried out using a horizontal U bend pipeline with a liquid supply section in the midway of pipeline. The onset of flooding in the horizontal U bend pipeline was measured. Effects of the length of horizontal pipe and the radius of U bend on the onset of flooding were discussed

  5. Flooding characteristics of gas-liquid two-phase flow in a horizontal U bend pipe

    Energy Technology Data Exchange (ETDEWEB)

    Sakaguchi, T.; Hosokawa, S.; Fujii, Y. [Kobe Univ. (Japan)] [and others

    1995-09-01

    For next-generation nuclear reactors, hybrid safety systems which consist of active and passive safety systems have been planned. Steam generators with horizontal U bend pipelines will be used as one of the passive safety systems. It is required to clarify flow characteristics, especially the onset of flooding, in the horizontal U bend pipelines in order to examine their safety. Flooding in vertical pipes has been studied extensively. However, there is little study on flooding in the horizontal U bend pipelines. It is supposed that the onset of flooding in the horizontal U bend pipelines is different from that in vertical pipes. On the other hand, liquid is generated due to condensation of steam in pipes of the horizontal steam generators at the loss of coolant accident because the steam generators will be used as a condenser of a cooling system of steam from the reactor. It is necessary to simulate this situation by the supply of water at the middle of horizontal pipe. In the present paper, experiments were carried out using a horizontal U bend pipeline with a liquid supply section in the midway of pipeline. The onset of flooding in the horizontal U bend pipeline was measured. Effects of the length of horizontal pipe and the radius of U bend on the onset of flooding were discussed.

  6. The effect of cyclic and dynamic loads on carbon steel pipe

    International Nuclear Information System (INIS)

    Rudland, D.L.; Scott, P.M.; Wilkowski, G.M.

    1996-02-01

    This report presents the results of four 152-mm (6-inch) diameter, unpressurized, circumferential through-wall-cracked, dynamic pipe experiments fabricated from STS410 carbon steel pipe manufactured in Japan. For three of these experiments, the through-wall crack was in the base metal. The displacement histories applied to these experiments were a quasi-static monotonic, dynamic monotonic, and dynamic, cyclic (R = -1) history. The through-wall crack for the third experiment was in a tungsten-inert-gas weld, fabricated in Japan, joining two lengths of STS410 pipe. The displacement history for this experiment was the same history applied to the dynamic, cyclic base metal experiment. The test temperature for each experiment was 300 C (572 F). The objective of these experiments was to compare a Japanese carbon steel pipe material with US pipe material, to ascertain whether this Japanese steel was as sensitive to dynamic and cyclic effects as US carbon steel pipe. In support of these pipe experiments, quasi-static and dynamic, tensile and fracture toughness tests were conducted. An analysis effort was performed that involved comparing experimental crack initiation and maximum moments with predictions based on available fracture prediction models, and calculating J-R curves for the pipe experiments using the η-factor method

  7. Continuous organic waste digester and methane gas generator

    Energy Technology Data Exchange (ETDEWEB)

    Araneta, V.A.

    1979-01-01

    A patent on the construction of a utility model of an industrial product of a continuous organic-waste digester and methane-gas generator is described. It comprises an airtight chamber to receive slurry of organic waste; a gas-water scrubber to purge carbon dioxide, odor-omitting gases and froth or scrum from newly formed methane gas evolving from said slurry of organic wastes; and two dually functioning slurry-feed and -discharge pipes connected to a reversible pump. It has one pipe with an opening at the base of an airtight chamber and the other pipe with up-ended openings below the fluid level of the slurry to be accumulated in the airtight chamber.

  8. Pipe fracture evaluations for leak-rate detection: Probabilistic models

    International Nuclear Information System (INIS)

    Rahman, S.; Wilkowski, G.; Ghadiali, N.

    1993-01-01

    This is the second in series of three papers generated from studies on nuclear pipe fracture evaluations for leak-rate detection. This paper focuses on the development of novel probabilistic models for stochastic performance evaluation of degraded nuclear piping systems. It was accomplished here in three distinct stages. First, a statistical analysis was conducted to characterize various input variables for thermo-hydraulic analysis and elastic-plastic fracture mechanics, such as material properties of pipe, crack morphology variables, and location of cracks found in nuclear piping. Second, a new stochastic model was developed to evaluate performance of degraded piping systems. It is based on accurate deterministic models for thermo-hydraulic and fracture mechanics analyses described in the first paper, statistical characterization of various input variables, and state-of-the-art methods of modem structural reliability theory. From this model. the conditional probability of failure as a function of leak-rate detection capability of the piping systems can be predicted. Third, a numerical example was presented to illustrate the proposed model for piping reliability analyses. Results clearly showed that the model provides satisfactory estimates of conditional failure probability with much less computational effort when compared with those obtained from Monte Carlo simulation. The probabilistic model developed in this paper will be applied to various piping in boiling water reactor and pressurized water reactor plants for leak-rate detection applications

  9. Fracture assessment of Savannah River Reactor carbon steel piping

    International Nuclear Information System (INIS)

    Mertz, G.E.; Stoner, K.J.; Caskey, G.R.; Begley, J.A.

    1991-01-01

    The Savannah River Site (SRS) production reactors have been in operation since the mid-1950's. One postulated failure mechanism for the reactor piping is brittle fracture of the original A285 and A53 carbon steel piping. Material testing of archival piping determined (1) the static and dynamic tensile properties; (2) Charpy impact toughness; and (3) the static and dynamic compact tension fracture toughness properties. The nil-ductility transition temperature (NDTT), determined by Charpy impact test, is above the minimum operating temperature for some of the piping materials. A fracture assessment was performed to demonstrate that potential flaws are stable under upset loading conditions and minimum operating temperatures. A review of potential degradation mechanisms and plant operating history identified weld defects as the most likely crack initiation site for brittle fracture. Piping weld defects, as characterized by radiographic and metallographic examination, and low fracture toughness material properties were postulated at high stress locations in the piping. Normal operating loads, upset loads, and residual stresses were assumed to act on the postulated flaws. Calculated allowable flaw lengths exceed the size of observed weld defects, indicating adequate margins of safety against brittle fracture. Thus, a detailed fracture assessment was able to demonstrate that the piping systems will not fail by brittle fracture, even though the NDTT for some of the piping is above the minimum system operating temperature

  10. The effect of external boundary conditions on condensation heat transfer in rotating heat pipes

    Science.gov (United States)

    Daniels, T. C.; Williams, R. J.

    1979-01-01

    Experimental evidence shows the importance of external boundary conditions on the overall performance of a rotating heat pipe condenser. Data are presented for the boundary conditions of constant heat flux and constant wall temperature for rotating heat pipes containing either pure vapor or a mixture of vapor and noncondensable gas as working fluid.

  11. Turbulent flow in a partially filled pipe

    Science.gov (United States)

    Ng, Henry; Cregan, Hope; Dodds, Jonathan; Poole, Robert; Dennis, David

    2017-11-01

    Turbulent flow in a pressure driven pipe running partially full has been investigated using high-speed 2D-3C Stereoscopic Particle Imaging Velocimetry. With the field-of-view spanning the entire pipe cross section we are able to reconstruct the full three dimensional quasi-instantaneous flow field by invoking Taylor's hypothesis. The measurements were carried out over a range of flow depths at a constant Reynolds number based on hydraulic diameter and bulk velocity of Re = 32 , 000 . In agreement with previous studies, the ``velocity dip'' phenomenon, whereby the location of the maximum streamwise velocity occurs below the free surface was observed. A mean flow secondary current is observed near the free surface with each of the counter-rotating rollers filling the half-width of the pipe. Unlike fully turbulent flow in a rectangular open channel or pressurized square duct flow where the secondary flow cells appear in pairs about a corner bisector, the mean secondary motion observed here manifests only as a single pair of vortices mirrored about the pipe vertical centreline.

  12. On the optimization of support positioning and stiffness for piping systems in power plants

    International Nuclear Information System (INIS)

    Collina, A.; Zanaboni, P.; Belloli, M.

    2005-01-01

    The optimal location of supports for the reduction of vibration in piping systems is an interesting structural problem, that can be approached also with the methods used in the updating parameters problems, especially when the cause of the vibration is due to a resonance or a ineffective damping level, and the shift of a critical frequency is an effective remedy. In the proposed paper a frequency domain method of Finite Element model updating is used in order to properly locate the natural frequencies of a given piping system, starting from the nominal condition. The method considers modal parameters, and enables to directly update the physical quantities of the finite element model, i.e., in the considered application, the stiffness and damping of the supporting devices. The model of the structure is made up by beam finite elements, lumped springs and masses, and rigid links. The general procedure is applied here updating the stiffness and location of the supports of the piping according to the comparison among the current frequencies of the piping systems structure and the ones that are required, according to specific requirements. Application to a system similar to a portion of an actual AP1000 (a new Advanced Passive Nuclear Reactor) piping-support layout is presented. (authors)

  13. Section of CMS Beam Pipe Removed

    CERN Multimedia

    2013-01-01

    Seven components of the beam pipe located at the heart of the CMS detector were removed in recent weeks. The delicate operations were performed in several stages as the detector was opened. Video of the extraction of one section: http://youtu.be/arGuFgWM7u0

  14. Efficient simulation of gas-liquid pipe flows using a generalized population balance equation coupled with the algebraic slip model

    KAUST Repository

    Icardi, Matteo; Ronco, Gianni; Marchisio, Daniele Luca; Labois, Mathieu

    2014-01-01

    The inhomogeneous generalized population balance equation, which is discretized with the direct quadrature method of moment (DQMOM), is solved to predict the bubble size distribution (BSD) in a vertical pipe flow. The proposed model is compared with a more classical approach where bubbles are characterized with a constant mean size. The turbulent two-phase flow field, which is modeled using a Reynolds-Averaged Navier-Stokes equation approach, is assumed to be in local equilibrium, thus the relative gas and liquid (slip) velocities can be calculated with the algebraic slip model, thereby accounting for the drag, lift, and lubrication forces. The complex relationship between the bubble size distribution and the resulting forces is described accurately by the DQMOM. Each quadrature node and weight represents a class of bubbles with characteristic size and number density, which change dynamically in time and space to preserve the first moments of the BSD. The predictions obtained are validated against previously published experimental data, thereby demonstrating the advantages of this approach for large-scale systems as well as suggesting future extensions to long piping systems and more complex geometries. © 2014 Elsevier Inc.

  15. Efficient simulation of gas-liquid pipe flows using a generalized population balance equation coupled with the algebraic slip model

    KAUST Repository

    Icardi, Matteo

    2014-09-01

    The inhomogeneous generalized population balance equation, which is discretized with the direct quadrature method of moment (DQMOM), is solved to predict the bubble size distribution (BSD) in a vertical pipe flow. The proposed model is compared with a more classical approach where bubbles are characterized with a constant mean size. The turbulent two-phase flow field, which is modeled using a Reynolds-Averaged Navier-Stokes equation approach, is assumed to be in local equilibrium, thus the relative gas and liquid (slip) velocities can be calculated with the algebraic slip model, thereby accounting for the drag, lift, and lubrication forces. The complex relationship between the bubble size distribution and the resulting forces is described accurately by the DQMOM. Each quadrature node and weight represents a class of bubbles with characteristic size and number density, which change dynamically in time and space to preserve the first moments of the BSD. The predictions obtained are validated against previously published experimental data, thereby demonstrating the advantages of this approach for large-scale systems as well as suggesting future extensions to long piping systems and more complex geometries. © 2014 Elsevier Inc.

  16. Sodium Variable Conductance Heat Pipe for Radioisotope Stirling Systems

    Science.gov (United States)

    Tarau, Calin; Anderson, William G.; Walker, Kara

    2009-01-01

    In a Stirling radioisotope system, heat must continually be removed from the General Purpose Heat Source (GPHS) modules to maintain the modules and surrounding insulation at acceptable temperatures. Normally, the Stirling convertor provides this cooling. If the converter stops in the current system, the insulation is designed to spoil, preventing damage to the GPHS, and also ending the mission. An alkali-metal Variable Conductance Heat Pipe (VCHP) has been designed to allow multiple stops and restarts of the Stirling convertor in an Advanced Stirling Radioisotope Generator (ASRG). When the Stirling convertor is turned off, the VCHP will activate when the temperatures rises 30 C above the setpoint temperature. A prototype VCHP with sodium as the working fluid was fabricated and tested in both gravity aided and against gravity conditions for a nominal heater head temperature of 790 C. The results show very good agreement with the predictions and validate the model. The gas front was located at the exit of the reservoir when heater head temperature was 790 C while cooling was ON, simulating an operating Advanced Stirling Converter (ASC). When cooling stopped, the temperature increased by 30 C, allowing the gas front to move past the radiator, which transferred the heat to the case. After resuming the cooling flow, the front returned at the initial location turning OFF the VCHP. The against gravity working conditions showed a colder reservoir and faster transients.

  17. Piping in need of a facelift

    CERN Multimedia

    HSE Unit

    2013-01-01

    The LS1 offers a good opportunity to renovate/consolidate the CERN piping system. This is actually one of this year’s objectives set by CERN's Director-General as the state of several pressurised pipe networks has become a matter of significant concern. The ageing infrastructure makes it essential to perform in-depth inspections and repairs on several networks, which are easier to perform when most systems are down.   We are advising each Department/Group concerned to take a series of actions to ensure that their pipelines comply with personal, environmental and operational safety requirements: an inventory of ageing installations to allow a long-term replacement plan to be drawn up; immediate repair in the event of major signs of deterioration; investigation and repair/mitigation measures to prevent leaks; marking and, if necessary, mechanical protection of pipes located in thoroughfares and exposed to vehicles or people. Help needed, questions? Do not hesitate to contact us ...

  18. Gas cooled reactors

    International Nuclear Information System (INIS)

    Kojima, Masayuki.

    1985-01-01

    Purpose: To enable direct cooling of reactor cores thereby improving the cooling efficiency upon accidents. Constitution: A plurality sets of heat exchange pipe groups are disposed around the reactor core, which are connected by way of communication pipes with a feedwater recycling device comprising gas/liquid separation device, recycling pump, feedwater pump and emergency water tank. Upon occurrence of loss of primary coolants accidents, the heat exchange pipe groups directly absorb the heat from the reactor core through radiation and convection. Although the water in the heat exchange pipe groups are boiled to evaporate if the forcive circulation is interrupted by the loss of electric power source, water in the emergency tank is supplied due to the head to the heat exchange pipe groups to continue the cooling. Furthermore, since the heat exchange pipe groups surround the entire circumference of the reactor core, cooling is carried out uniformly without resulting deformation or stresses due to the thermal imbalance. (Sekiya, K.)

  19. HPTAM, a two-dimensional Heat Pipe Transient Analysis Model, including the startup from a frozen state

    Science.gov (United States)

    Tournier, Jean-Michel; El-Genk, Mohamed S.

    1995-01-01

    A two-dimensional Heat Pipe Transient Analysis Model, 'HPTAM,' was developed to simulate the transient operation of fully-thawed heat pipes and the startup of heat pipes from a frozen state. The model incorporates: (a) sublimation and resolidification of working fluid; (b) melting and freezing of the working fluid in the porous wick; (c) evaporation of thawed working fluid and condensation as a thin liquid film on a frozen substrate; (d) free-molecule, transition, and continuum vapor flow regimes, using the Dusty Gas Model; (e) liquid flow and heat transfer in the porous wick; and (f) thermal and hydrodynamic couplings of phases at their respective interfaces. HPTAM predicts the radius of curvature of the liquid meniscus at the liquid-vapor interface and the radial location of the working fluid level (liquid or solid) in the wick. It also includes the transverse momentum jump condition (capillary relationship of Pascal) at the liquid-vapor interface and geometrically relates the radius of curvature of the liquid meniscus to the volume fraction of vapor in the wick. The present model predicts the capillary limit and partial liquid recess (dryout) in the evaporator wick, and incorporates a liquid pooling submodel, which simulates accumulation of the excess liquid in the vapor core at the condenser end.

  20. Model-Based Detection of Pipe Leakage at Joints

    International Nuclear Information System (INIS)

    Kim, Taejin; Youn, Byeng D.; Woo, Sihyong

    2015-01-01

    Time domain reflectometry (TDR) is widely used for wire failure detection. It transmits a pulse that is reflected at the boundaries of different characteristic impedances. By analyzing the reflected signal, TDR makes it possible to locate the failure. In this study, TDR was used to detect the water leakage at a pipe joint. A wire attached to the pipe surface was soaked by water when a leak occurred, which affected the characteristic impedance of the wet part, resulting in a change in the reflected signal. To infer the leakage from the TDR signal, we first developed a finite difference time domain-based forward model that provided the output of the TDR signal given the configuration of the transmission line. Then, by solving the inverse problem, the locations of the leaks were found

  1. 49 CFR 192.111 - Design factor (F) for steel pipe.

    Science.gov (United States)

    2010-10-01

    ... NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Pipe Design § 192.111 Design factor (F... street, or a railroad; (3) Is supported by a vehicular, pedestrian, railroad, or pipeline bridge; or (4...

  2. Prediction of crack propagation and arrest in X100 natural gas transmission pipelines with a strain rate dependent damage model (SRDD). Part 2: Large scale pipe models with gas depressurisation

    International Nuclear Information System (INIS)

    Oikonomidis, F.; Shterenlikht, A.; Truman, C.E.

    2014-01-01

    Part 1 of this paper described a specimen for the measurement of high strain rate flow and fracture properties of pipe material and for tuning a strain rate dependent damage model (SRDD). In part 2 the tuned SRDD model is used for the simulation of axial crack propagation and arrest in X100 natural gas pipelines. Linear pressure drop model was adopted behind the crack tip, and an exponential gas depressurisation model was used ahead of the crack tip. The model correctly predicted the crack initiation (burst) pressure, the crack speed and the crack arrest length. Strain rates between 1000 s −1 and 3000 s −1 immediately ahead of the crack tip are predicted, giving a strong indication that a strain rate material model is required for the structural integrity assessment of the natural gas pipelines. The models predict the stress triaxiality of about 0.65 for at least 1 m ahead of the crack tip, gradually dropping to 0.5 at distances of about 5–7 m ahead of the crack tip. Finally, the models predicted a linear drop in crack tip opening angle (CTOA) from about 11−12° at the onset of crack propagation down to 7−8° at crack arrest. Only the lower of these values agree with those reported in the literature for quasi-static measurements. This discrepancy might indicate substantial strain rate dependence in CTOA. - Highlights: • Finite element simulations of 3 burst tests of X100 pipes are detailed. • Strain rate dependent damage model, tuned on small scale X100 samples, was used. • The models correctly predict burst pressure, crack speed and crack arrest length. • The model predicts a crack length dependent critical CTOA. • The strain rate dependent damage model is verified as mesh independent

  3. Stress analysis of the O-element pipe during the process of flue gases purification

    Directory of Open Access Journals (Sweden)

    Nekvasil R.

    2008-11-01

    Full Text Available Equipment for flue gases purification from undesired substances is used throughout power and other types of industry. This paper deals with damaging of the O-element pipe designed to remove sulphur from the flue gases, i.e. damaging of the pipe during flue gases purification. This purification is conducted by spraying the water into the O-shaped pipe where the flue gases flow. Thus the sulphur binds itself onto the water and gets removed from the flue gas. Injection of cold water into hot flue gases, however, causes high stress on the inside of the pipe, which can gradually damage the O-element pipe. In this paper initial injection of water into hot pipe all the way to stabilization of temperature fields will be analyzed and the most dangerous places which shall be considered for fatigue will be determined.

  4. Nuclear piping and pipe support design and operability relating to loadings and small bore piping

    International Nuclear Information System (INIS)

    Stout, D.H.; Tubbs, J.M.; Callaway, W.O.; Tang, H.T.; Van Duyne, D.A.

    1994-01-01

    The present nuclear piping system design practices for loadings, multiple support design and small bore piping evaluation are overly conservative. The paper discusses the results developed for realistic definitions of loadings and loading combinations with methodology for combining loads under various conditions for supports and multiple support design. The paper also discusses a simplified method developed for performing deadweight and thermal evaluations of small bore piping systems. Although the simplified method is oriented towards the qualification of piping in older plants, this approach is applicable to plants designed to any edition of the ASME Section III or B31.1 piping codes

  5. Capabilities of a New Pressure Controller for Gas-Controlled Heat Pipes

    Science.gov (United States)

    Giunta, S.; Merlone, A.; Marenco, S.; Marcarino, P.; Tiziani, A.

    2008-10-01

    Pressure control is used in many metrological applications and for the control of thermodynamic quantities. At the Italian National Research Institute of Metrology (INRiM), a new pressure controller has been designed and assembled, operating in the pressure range between 4 kPa and 400 kPa. This innovative instrument uses a commercial pressure transducer with a sensitivity of 10-4 and several electro-valves interposed among calibrated volumes of different dimensions in order to realize known ratios for very fine pressure changes. The device is provided with several circuits to drive the electro-valve actions, for signal processing and transmission, and for both manual and automatic control. Input/output peripherals, such as a 4 × 20 dot matrix display and a 4 × 4 keyboard, allow setting of the parameters and data visualization, while a remote control port allows interfacing with a computer. The operating principle of this pressure controller has been recently applied, with excellent results, to control the pressure in gas-controlled heat pipes by using a standard platinum resistance thermometer as a temperature/pressure sensor, achieving in this case a relative sensitivity better than 10-6 in pressure. Several tests were also made to control the pressure by means of a commercial sensor. The device, its main components, and its capabilities are here reported, together with application tests and results.

  6. Three-dimensional numerical modeling of turbulent single-phase and two-phase flow in curved pipes

    International Nuclear Information System (INIS)

    Xin, R.C.; Dong, Z.F.; Ebadian, M.A.

    1996-01-01

    In this study, three-dimensional single-phase and two-phase flows in curved pipes have been investigated numerically. Two different pipe configurations were computed. When the results of the single-phase flow simulation were compared with the experimental data, a fairly good agreement was achieved. A flow-developing process has been suggested in single-phase flow, in which the turbulence is stronger near the outer tube wall than near the inner tube wall. For two-phase flow, the Eulerian multiphase model was used to simulate the phase distribution of a three-dimensional gas-liquid bubble flow in curved pipe. The RNG/κ-ε turbulence model was used to determine the turbulence field. An inlet gas void fraction of 5 percent was simulated. The gas phase effects on the liquid phase flow velocity have been examined by comparing the results of single-phase flow and two-phase flow. The findings show that for the downward flow in the U bend, the gas concentrates at the inner portion of the cross section at φ = π/18 - π/6 in most cases. The results of the phase distribution simulation are compared to experimental observations qualitatively and topologically

  7. Probabilistic pipe fracture evaluations for applications to leak-rate detection

    Energy Technology Data Exchange (ETDEWEB)

    Rahman, S; Wilkowski, G; Ghadiali, N [Battelle Columbus Labs., OH (United States)

    1993-12-31

    Stochastic pipe fracture evaluations are conducted for applications to leak-rate detection. A state-of-the-art review was first conducted to evaluate the adequacy of current deterministic models for thermo-hydraulic and elastic-plastic fracture analyses. Then a new probabilistic model was developed with the above deterministic models for structural reliability analysis of cracked piping systems and statistical characterization of crack morphology parameters, material properties of pipe, and crack location. The proposed models are then applied for computing conditional probability of failure for various nuclear piping systems in BWR and PWR plants. The PRAISE code was not used, and the probabilistic model is based on modern methods of stochastic mechanics, computationally far superior to Monte Carlo and Stratified Sampling methods used in PRAISE. 10 refs., 9 figs., 1 tab.

  8. Probabilistic pipe fracture evaluations for applications to leak-rate detection

    International Nuclear Information System (INIS)

    Rahman, S.; Wilkowski, G.; Ghadiali, N.

    1992-01-01

    Stochastic pipe fracture evaluations are conducted for applications to leak-rate detection. A state-of-the-art review was first conducted to evaluate the adequacy of current deterministic models for thermo-hydraulic and elastic-plastic fracture analyses. Then a new probabilistic model was developed with the above deterministic models for structural reliability analysis of cracked piping systems and statistical characterization of crack morphology parameters, material properties of pipe, and crack location. The proposed models are then applied for computing conditional probability of failure for various nuclear piping systems in BWR and PWR plants. The PRAISE code was not used, and the probabilistic model is based on modern methods of stochastic mechanics, computationally far superior to Monte Carlo and Stratified Sampling methods used in PRAISE. 10 refs., 9 figs., 1 tab

  9. Research and Development of Ultra-High Strength X100 Welded Pipe

    Science.gov (United States)

    Chuanguo, Zhang; Lei, Zheng; Ping, Hu; Bei, Zhang; Kougen, Wu; Weifeng, Huang

    Ultra-high strength X100 welded pipe can be used in the construction of long distance oil and gas pipeline to improve transmission capacity and reduce operation cost. By using the way of thermo-simulation and pilot rolling, the CCT (Continuous Cooling Transformation) diagram and the relationship between ACC (Accelerated Cooling) parameters, microstructure and mechanical properties were studied for the designed X100 pipeline steel with low carbon, high manganese and niobium micro-alloyed composition in lab. The analysis of CCT diagram indicates that the suitable hardness and microstructure can be obtained in the cooling rate of 20 80°C/sec. The pilot rolling results show that the ACC cooling start temperature below Ar3 phase transformation point is beneficial to increase uniform elongation, and the cooling stop temperature of 150 350°C is helpful to obtain high strength and toughness combination. Based on the research conclusions, the X100 plate and UOE pipe with dimension in O.D.1219×W.T.14.8mm, O.D.1219×W.T.17.8mm, designed for the natural gas transmission pipeline, were trial produced. The manufactured pipe body impact absorbed energy at -10°C is over 250J. The DWTT shear area ratio at 0°C is over 85%. The transverse strength meets the X100 grade requirement, and uniform elongation is over 4%. The X100 plate and UOE pipe with dimension in O.D.711×W.T.20.0mm, O.D.711×W.T.12.5mm, designed for an offshore engineering, were also trial produced. The average impact absorbed energy of pipe body at -30°C is over 200J. The average impact absorbed energy of HAZ (Heat-affected zone) and WM (Welded Seam) at -30°C is over 100J. And the good pipe shapes were obtained

  10. Application of sensitivity analysis for optimized piping support design

    International Nuclear Information System (INIS)

    Tai, K.; Nakatogawa, T.; Hisada, T.; Noguchi, H.; Ichihashi, I.; Ogo, H.

    1993-01-01

    The objective of this study was to see if recent developments in non-linear sensitivity analysis could be applied to the design of nuclear piping systems which use non-linear supports and to develop a practical method of designing such piping systems. In the study presented in this paper, the seismic response of a typical piping system was analyzed using a dynamic non-linear FEM and a sensitivity analysis was carried out. Then optimization for the design of the piping system supports was investigated, selecting the support location and yield load of the non-linear supports (bi-linear model) as main design parameters. It was concluded that the optimized design was a matter of combining overall system reliability with the achievement of an efficient damping effect from the non-linear supports. The analysis also demonstrated sensitivity factors are useful in the planning stage of support design. (author)

  11. Quantification and localization of internal pipe damage

    NARCIS (Netherlands)

    Vogelaar, B.B.S.A.; Golombok, M.

    2016-01-01

    Internal pipeline defects are detectable and locatable from guided acoustic wave reflections using sensors mounted on the outer wall of a pipe. We demonstrate pipeline integrity monitoring with only two single acoustic sensors. Multi-mode dispersion imaging of shear displacement shows that the pure

  12. Analysis of Defective Pipings in Nuclear Power Plants and Applications of Guided Ultrasonic Wave Techniques

    International Nuclear Information System (INIS)

    Koo, Dae Seo; Cheong, Yong Moo; Jung, Hyun Kyu; Park, Chi Seung; Park, Jae Suck; Choi, H. R.; Jung, S. S.

    2006-07-01

    In order to apply the guided ultrasonic techniques to the pipes in nuclear power plants, the cases of defective pipes of nuclear power plants, were investigated. It was confirmed that geometric factors of pipes, such as location, shape, and allowable space were impertinent for the application of guided ultrasonic techniques to pipes of nuclear power plants. The quality of pipes, supports, signals analysis of weldment/defects, acquisition of accurate defects signals also make difficult to apply the guided ultrasonic techniques to pipes of nuclear power plants. Thus, a piping mock-up representing the pipes in the nuclear power plants were designed and fabricated. The artificial flaws will be fabricated on the piping mock-up. The signals of guided ultrasonic waves from the artificial flaws will be analyzed. The guided ultrasonic techniques will be applied to the inspection of pipes of nuclear power plants according to the basis of signals analysis of artificial flaws in the piping mock-up

  13. Hot Leg Piping Materials Issues

    International Nuclear Information System (INIS)

    V. Munne

    2006-01-01

    With Naval Reactors (NR) approval of the Naval Reactors Prime Contractor Team (NRPCT) recommendation to develop a gas cooled reactor directly coupled to a Brayton power conversion system as the space nuclear power plant (SNPP) for Project Prometheus (References a and b) the reactor outlet piping was recognized to require a design that utilizes internal insulation (Reference c). The initial pipe design suggested ceramic fiber blanket as the insulation material based on requirements associated with service temperature capability within the expected range, very low thermal conductivity, and low density. Nevertheless, it was not considered to be well suited for internal insulation use because its very high surface area and proclivity for holding adsorbed gases, especially water, would make outgassing a source of contaminant gases in the He-Xe working fluid. Additionally, ceramic fiber blanket insulating materials become very friable after relatively short service periods at working temperatures and small pieces of fiber could be dislodged and contaminate the system. Consequently, alternative insulation materials were sought that would have comparable thermal properties and density but superior structural integrity and greatly reduced outgassing. This letter provides technical information regarding insulation and materials issues for the Hot Leg Piping preconceptual design developed for the Project Prometheus space nuclear power plant (SNPP)

  14. Two-branch Gas Experiments for Hot Gas Mixing of HTR-PM

    International Nuclear Information System (INIS)

    Zhou Yangping; Hao Pengefei; He Heng; Li Fu; Shi Lei

    2014-01-01

    A model experiment is proposed to investigate the hot gas mixing efficiency of HTR-PM reactor outlet. The test facility is introduced which is set at a scale of 1:2.5 comparing with the design of thermal mixing structure at HTR-PM reactor outlet. The test facility using air as its flow media includes inlet pipe system, electric heaters, main body of test facility, hot gas duct, exhaust pipe system and I&C system. Two-branch gas experiments are conducted on the test facility and the values of thermal-fluid parameters are collected and analyzed which include the temperature, pressure and velocity of the flow as well as the temperature of the tube wall. The analysis result shows the mixing efficiency is higher than the requirement of thermal mixing by steam generator even with conservative assumption which indicates that the design of hog gas mixing structure of HTR-PM fulfills the requirement for thermal mixing at two-branch working conditions. (author)

  15. Gas compressor with side branch absorber for pulsation control

    Science.gov (United States)

    Harris, Ralph E [San Antonio, TX; Scrivner, Christine M [San Antonio, TX; Broerman, III, Eugene L.

    2011-05-24

    A method and system for reducing pulsation in lateral piping associated with a gas compressor system. A tunable side branch absorber (TSBA) is installed on the lateral piping. A pulsation sensor is placed in the lateral piping, to measure pulsation within the piping. The sensor output signals are delivered to a controller, which controls actuators that change the acoustic dimensions of the SBA.

  16. Pipe robots for internal inspection, non-destructive testing and machining of pipelines

    International Nuclear Information System (INIS)

    Reiss, Alexander

    2016-01-01

    Inspector Systems is a specialist in manufacturing of tethered self-propelled pipe robots for internal inspection, non-destructive testing and machining of pipeline systems. Our industrial sectors, which originates from 30 year experience in the nuclear industry, are Gas and Oil (On-/Offshore, Refineries), Chemical, Petrochemical, Water etc. The pipe robots are able to get inserted through poor access points (e.g. valves) and to pass in bi-directional travelling vertical sections and numerous bends with small arc radius. The paper describes the system concept and performance of the pipe robot technology. A modular construction allows to equip the robots with different operational elements for the respective application.

  17. Understanding the formation process of the liquid slug in a hilly-terrain wet natural gas pipeline

    DEFF Research Database (Denmark)

    Yang, Yan; Li, Jingbo; Wang, Shuli

    2017-01-01

    condition on the liquid slug formation is discussed including pipe diameter, inclination angle, gas superficial velocity and liquid holdup. The results show that the pipe is blocked by the liquid slug at the moment of slug formed. The pipe pressure suddenly increases, and then decreases gradually...... in the process of liquid slug formation and motion. The pipe pressure drop and liquid holdup decrease along with the increasing inclination angle of ascending pipe. On the contrary, they rise with the increase of the inclination angle of descending pipe. Higher gas superficial velocity and liquid holdup result...

  18. Residual stress measurement in 304 stainless steel weld overlay pipes

    International Nuclear Information System (INIS)

    Yen, H.J.; Lin, M.C.C.; Chen, L.J.

    1996-01-01

    Welding overlay repair (WOR) is commonly employed to rebuild piping systems suffering from intergranular stress corrosion cracking (IGSCC). To understand the effects of this repair, it is necessary to investigate the distribution of residual stresses in the welding pipe. The overlay welding technique must induce compressive residual stress at the inner surface of the welded pipe to prevent IGSCC. To understand the bulk residual stress distribution, the stress profile as a function of location within wall is examined. In this study the full destructive residual stress measurement technique -- a cutting and sectioning method -- is used to determine the residual stress distribution. The sample is type 304 stainless steel weld overlay pipe with an outside diameter of 267 mm. A pipe segment is cut from the circular pipe; then a thin layer is removed axially from the inner to the outer surfaces until further sectioning is impractical. The total residual stress is calculated by adding the stress relieved by cutting the section away to the stress relieved by axially sectioning. The axial and hoop residual stresses are compressive at the inner surface of the weld overlay pipe. Compressive stress exists not only at the surface but is also distributed over most of the pipe's cross section. On the one hand, the maximum compressive hoop residual stress appears at the pipe's inner surface. The thermal-mechanical induced crack closure from significant compressive residual stress is discussed. This crack closure can thus prevent IGSCC very effectively

  19. HPFRCC - Extruded Pipes

    DEFF Research Database (Denmark)

    Stang, Henrik; Pedersen, Carsten

    1996-01-01

    The present paper gives an overview of the research onHigh Performance Fiber Reinforced Cementitious Composite -- HPFRCC --pipes recently carried out at Department of Structural Engineering, Technical University of Denmark. The project combines material development, processing technique development......-w$ relationship is presented. Structural development involved definition of a new type of semi-flexiblecement based pipe, i.e. a cement based pipe characterized by the fact that the soil-pipe interaction related to pipe deformation is an importantcontribution to the in-situ load carrying capacity of the pipe...

  20. Flow-permeability feedbacks and the development of segregation pipes in volcanic materials

    Science.gov (United States)

    Rust, Alison

    2014-05-01

    Flow and transformation in volcanic porous media is important for the segregation of melts and aqueous fluids from magmas as well as elutriation of fine ash from pyroclastic flows and vents. The general topic will be discussed in the framework of understanding sets of vertical pipes found in two very different types of volcanic deposits: 1) vesicular (bubbly) cylinders in basalt lava flows and 2) gas escape pipes in pyroclastic flow deposits. In both cases the cylinders can be explained by a flow-permeability feedback where perturbations in porosity and thus permeability cause locally higher flow speeds that in turn locally increase the permeability. For vesicular cylinders in lava flows, the porous medium is a framework of crystals within the magma. Above a critical crystallinity, which depends on the shape and size distribution of the crystals, the crystals form a touching framework. As the water-saturated magma continues to cool, it crystallizes anhydrous minerals, resulting in the exsolution of water vapour bubbles that can drive flow of bubbly melt through the crystal network. It is common to find sets of vertical cylinders of bubby melt in solidified lava flows, with compositions that match the residual melt from 35-50% crystallization of the host basalt. These cylinders resemble chimneys in experiments of crystallising ammonium chloride solution that are explained by reactive flow with porous medium convection. The Rayleigh number for the magmatic case is too low for convection but the growth of steam bubbles as the magma crystallizes induces pore fluid flow up through the permeable crystal pile even if there is no convective instability. This bubble-growth-driven upward flow is reactive and can lead to channelization because of a feedback between velocity and permeability. For the gas escape pipes in pyroclastic flows, the porous medium is a very poorly sorted granular material composed of fragments of solid magma with a huge range of grain sizes from ash

  1. Pipe damping

    International Nuclear Information System (INIS)

    Ware, A.G.

    1985-01-01

    Studies are being conducted at the Idaho National Engineering Laboratory to determine whether an increase in the damping values used in seismic structural analyses of nuclear piping systems is justified. Increasing the allowable damping would allow fewer piping supports which could lead to safer, more reliable, and less costly piping systems. Test data from availble literature were examined to determine the important parameters contributing to piping system damping, and each was investigated in separate-effects tests. From the combined results a world pipe damping data bank was established and multiple regression analyses performed to assess the relative contributions of the various parameters. The program is being extended to determine damping applicable to higher frequency (33 to 100 Hz) fluid-induced loadings. The goals of the program are to establish a methodology for predicting piping system damping and to recommend revised guidelines for the damping values to be included in analyses

  2. Development of Next Generation Multiphase Pipe Flow Prediction Tools

    Energy Technology Data Exchange (ETDEWEB)

    Tulsa Fluid Flow

    2008-08-31

    The developments of fields in deep waters (5000 ft and more) is a common occurrence. It is inevitable that production systems will operate under multiphase flow conditions (simultaneous flow of gas-oil-and water possibly along with sand, hydrates, and waxes). Multiphase flow prediction tools are essential for every phase of the hydrocarbon recovery from design to operation. The recovery from deep-waters poses special challenges and requires accurate multiphase flow predictive tools for several applications including the design and diagnostics of the production systems, separation of phases in horizontal wells, and multiphase separation (topside, seabed or bottom-hole). It is very crucial to any multiphase separation technique that is employed either at topside, seabed or bottom-hole to know inlet conditions such as the flow rates, flow patterns, and volume fractions of gas, oil and water coming into the separation devices. The overall objective was to develop a unified model for gas-oil-water three-phase flow in wells, flow lines, and pipelines to predict the flow characteristics such as flow patterns, phase distributions, and pressure gradient encountered during petroleum production at different flow conditions (pipe diameter and inclination, fluid properties and flow rates). The project was conducted in two periods. In Period 1 (four years), gas-oil-water flow in pipes were investigated to understand the fundamental physical mechanisms describing the interaction between the gas-oil-water phases under flowing conditions, and a unified model was developed utilizing a novel modeling approach. A gas-oil-water pipe flow database including field and laboratory data was formed in Period 2 (one year). The database was utilized in model performance demonstration. Period 1 primarily consisted of the development of a unified model and software to predict the gas-oil-water flow, and experimental studies of the gas-oil-water project, including flow behavior description and

  3. Control device for combustible gas concentration

    International Nuclear Information System (INIS)

    Osawa, Yasuo.

    1988-01-01

    Purpose: To control the concentration of combustible gases such as hydrogen evolved in a reactor container upon loss-of-coolant accidents. Constitution: Combustible gases evolved from the lower area of a drywell in which a combustible atmosphere is liable to be formed locally are taken out through a take-out pipeway to the outside of a reactor container and processed by a hydrogen-oxygen recombiner. Combustible gases in other areas of the drywell are also introduced to the lower area of the drywell and then taken-out externally for procession. Further, combustible gases in the suppression chamber are introduced by the opening of a vacuum breaking valve through a gas supply pipe to the lower area of the drywell and fluids in the drywell are stirred and diluted with fluids exhausted from the gas supply pipe. Disposition of such take-out pipeway and gas supply pipe can reduce the possibility of forming local combustible atmosphere to improve the integrity of the reactor container. (Kamimura, M.)

  4. Assessment of water pipes durability under pressure surge

    Science.gov (United States)

    Pham Ha, Hai; Minh, Lanh Pham Thi; Tang Van, Lam; Bulgakov, Boris; Bazhenova, Soafia

    2017-10-01

    Surge phenomenon occurs on the pipeline by the closing valve or pump suddenly lost power. Due to the complexity of the water hammer simulation, previous researches have only considered water hammer on the single pipe or calculation of some positions on water pipe network, it have not been analysis for all of pipe on the water distribution systems. Simulation of water hammer due to closing valve on water distribution system and the influence level of pressure surge is evaluated at the defects on pipe. Water hammer on water supply pipe network are simulated by Water HAMMER software academic version and the capacity of defects are calculated by SINTAP. SINTAP developed from Brite-Euram projects in Brussels-Belgium with the aim to develop a process for assessing the integrity of the structure for the European industry. Based on the principle of mechanical fault, indicating the size of defects in materials affect the load capacity of the product in the course of work, the process has proposed setting up the diagram to fatigue assessment defect (FAD). The methods are applied for water pipe networks of Lien Chieu district, Da Nang city, Viet Nam, the results show the affected area of wave pressure by closing the valve and thereby assess the greatest pressure surge effect to corroded pipe. The SINTAP standard and finite element mesh analysis at the defect during the occurrence of pressure surge which will accurately assess the bearing capacity of the old pipes. This is one of the bases to predict the leakage locations on the water distribution systems. Amount of water hammer when identified on the water supply networks are decreasing due to local losses at the nodes as well as the friction with pipe wall, so this paper adequately simulate water hammer phenomena applying for actual water distribution systems. The research verified that pipe wall with defect is damaged under the pressure surge value.

  5. Remediation System Evaluation, Northwest Pipe and Casing Site

    Science.gov (United States)

    The Northwest Pipe and Casing Site is located in Clackamas, Oregon, approximately 20 miles southeastof Portland. The site consists of approximately 53 acres, and has historically been divided into two parcels(Parcel A to the north and Parcel B to the..

  6. Pipe inspection using the pipe crawler. Innovative technology summary report

    International Nuclear Information System (INIS)

    1999-05-01

    The US Department of Energy (DOE) continually seeks safer and more cost-effective remediation technologies for use in the decontamination and decommissioning (D and D) of nuclear facilities. In several of the buildings at the Fernald Site, there is piping that was used to transport process materials. As the demolition of these buildings occur, disposal of this piping has become a costly issue. Currently, all process piping is cut into ten-foot or less sections, the ends of the piping are wrapped and taped to prevent the release of any potential contaminants into the air, and the piping is placed in roll off boxes for eventual repackaging and shipment to the Nevada Test Site (NTS) for disposal. Alternatives that allow for the onsite disposal of process piping are greatly desired due to the potential for dramatic savings in current offsite disposal costs. No means is currently employed to allow for the adequate inspection of the interior of piping, and consequently, process piping has been assumed to be internally contaminated and thus routinely disposed of at NTS. The BTX-II system incorporates a high-resolution micro color camera with lightheads, cabling, a monitor, and a video recorder. The complete probe is capable of inspecting pipes with an internal diameter (ID) as small as 1.4 inches. By using readily interchangeable lightheads, the same system is capable of inspecting piping up to 24 inches in ID. The original development of the BTX system was for inspection of boiler tubes and small diameter pipes for build-up, pitting, and corrosion. However, the system is well suited for inspecting the interior of most types of piping and other small, confined areas. The report describes the technology, its performance, uses, cost, regulatory and policy issues, and lessons learned

  7. Pipe inspection using the pipe crawler. Innovative technology summary report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-01

    The US Department of Energy (DOE) continually seeks safer and more cost-effective remediation technologies for use in the decontamination and decommissioning (D and D) of nuclear facilities. In several of the buildings at the Fernald Site, there is piping that was used to transport process materials. As the demolition of these buildings occur, disposal of this piping has become a costly issue. Currently, all process piping is cut into ten-foot or less sections, the ends of the piping are wrapped and taped to prevent the release of any potential contaminants into the air, and the piping is placed in roll off boxes for eventual repackaging and shipment to the Nevada Test Site (NTS) for disposal. Alternatives that allow for the onsite disposal of process piping are greatly desired due to the potential for dramatic savings in current offsite disposal costs. No means is currently employed to allow for the adequate inspection of the interior of piping, and consequently, process piping has been assumed to be internally contaminated and thus routinely disposed of at NTS. The BTX-II system incorporates a high-resolution micro color camera with lightheads, cabling, a monitor, and a video recorder. The complete probe is capable of inspecting pipes with an internal diameter (ID) as small as 1.4 inches. By using readily interchangeable lightheads, the same system is capable of inspecting piping up to 24 inches in ID. The original development of the BTX system was for inspection of boiler tubes and small diameter pipes for build-up, pitting, and corrosion. However, the system is well suited for inspecting the interior of most types of piping and other small, confined areas. The report describes the technology, its performance, uses, cost, regulatory and policy issues, and lessons learned.

  8. Piping damping tests evaluating influence of types of support and excitation

    International Nuclear Information System (INIS)

    Arendts, J.G.; Ware, A.G.; Gorman, V.W.

    1985-01-01

    The United States Nuclear Regulatory Commission and the Electric Power Research Institute have jointly sponsored construction of two laboratory piping systems at the ANCO Engineers facility in California. EG and G Idaho used the second of these systems to obtain piping system damping data using different supports and methods of excitation. The 6-in. carbon steel piping system was approximately 50 ft in length with two 3-in. branch lines. It was supported at five locations and excited using a single electrohydraulic shaker. Both random and swept sine methods of excitations were used. A variable support attached near the shaker location allowed four different configurations to be tested: a rigid strut, a mechanical snubber, a hydraulic snubber, and a rigid strut with a gap. Data were recorded for the lowest nine significant modes. Damping for the first three modes ranged for 1 to 3% of critical damping and decreased as frequency increased. The random excitation produced a slightly higher average overall damping of the system

  9. Field experience with a novel pipe protection and monitoring system for large offshore pipeline construction projects

    Energy Technology Data Exchange (ETDEWEB)

    Magerstaedt, Michael; Blitz, Gunther [ROSEN Swiss AG, Stans (Switzerland); Sabido, Carlos E. [ROSEN Technology and Research Center, Lingen (Germany)

    2012-07-01

    For pipe joints stored during large-scale offshore pipeline construction projects, corrosion protection as well as protection from physical damage of pipelines is very important. Integrity Management does not just start with the operation of a pipeline. In the past, with the much lower risks and cost at stake in on shore constriction, this factor was often overlooked. Sometimes, newly laid pipelines failed upon hydrostatic testing or even during operation. Causes were corrosion or damage the pipe joints took before pipeline laying. For offshore projects, the cost and consequences associated with such failures are orders of magnitude higher and must be avoided by all means. Within six months from the conception of the idea, a system was developed and deployed that protected (and in part still protects) a large number of pipe joints used in a European offshore gas pipeline project more than 2000 km. The pipe joints were physically protected from corrosion, interior contamination, and condensation. At the same time, the system provided real-time monitoring of more than 100'000 pipe joints stored at 5 storage yards distributed over 3 countries with distances of more than 1200 km apart from each other. Every single joint was identified with its location and status at every time during the storage period. Any third-party interference was transmitted to a central control room in real time as well. Protection of the pipe joints was provided vs.: corrosion of pipe joint end cutbacks exposed to the maritime climate for up to 2 years; contamination of the pipe interior by: foreign material, dirt, water, ice, animals. Third party damage to the pipe joints; damage to the protection system or to the transmission network; fire; theft of pipe joints or other equipment. System features were: modular pipe caps that, protect the pipe interior, cover both inner and outer cutback, allow ventilation of the pipe interior, continuously monitor each pipe joint for third party damage

  10. Environmental performances of gas pipe materials

    International Nuclear Information System (INIS)

    Van Nifterik, G.

    1996-01-01

    In constructing new gas pipelines energy distribution companies are increasingly dealing with the question of which material has the lowest environmental impact. Gastec (Dutch gas research institute) and the 'Centrum voor Milieukunde Leiden' (Centre for Environmental Studies of the University of Leiden) studied and compared the environmental aspects of such materials. The study concerns the entire life cycle from raw materials production through digging and welding or fusion joining to the moment the materials are discarded as waste. 2 figs

  11. An Investigation of Aging Behaviour in Microalloyed Steel (X70) UOE Pipe

    Science.gov (United States)

    Wiskel, J. B.; Ma, J.; Ivey, D. G.; Henein, H.

    Aging of microalloyed steel pipe can occur at relatively low temperatures associated with the pipe coating process and/or during long term storage or use. The aging phenomenon is primarily attributed to C diffusion to dislocations and subsequent pinning of these dislocations. Important factors in the aging process include time, temperature, chemical composition and plastic deformation (arising from the pipe forming process). The work presented in this paper uses a Box-Behnken experimental design to determine the effect of time, temperature, location in the UOE pipe (90° or 180° to the weld), position through the pipe wall thickness (ID, CL or OD) and the steel's C/Nb ratio (0.60, 1.25 and 1.80) on the change in yield strength of three (uncoated) X70 UOE pipes. Quantitative microstructure analysis is undertaken to determine the grain size and microconstituent fractions of the as-received pipe material. Quadratic equations and response surface(s) correlating the significant aging variables with changes in the longitudinal yield stress of the pipe are developed. Both through thickness position and the C/Nb ratio, followed by aging temperature, had the largest effect on the change in longitudinal yield strength.

  12. Leak detection in gas pipeline by acoustic and signal processing - A review

    Science.gov (United States)

    Adnan, N. F.; Ghazali, M. F.; Amin, M. M.; Hamat, A. M. A.

    2015-12-01

    The pipeline system is the most important part in media transport in order to deliver fluid to another station. The weak maintenance and poor safety will contribute to financial losses in term of fluid waste and environmental impacts. There are many classifications of techniques to make it easier to show their specific method and application. This paper's discussion about gas leak detection in pipeline system using acoustic method will be presented in this paper. The wave propagation in the pipeline is a key parameter in acoustic method when the leak occurs and the pressure balance of the pipe will generated by the friction between wall in the pipe. The signal processing is used to decompose the raw signal and show in time- frequency. Findings based on the acoustic method can be used for comparative study in the future. Acoustic signal and HHT is the best method to detect leak in gas pipelines. More experiments and simulation need to be carried out to get the fast result of leaking and estimation of their location.

  13. Finned Carbon-Carbon Heat Pipe with Potassium Working Fluid

    Science.gov (United States)

    Juhasz, Albert J.

    2010-01-01

    This elemental space radiator heat pipe is designed to operate in the 700 to 875 K temperature range. It consists of a C-C (carbon-carbon) shell made from poly-acrylonitride fibers that are woven in an angle interlock pattern and densified with pitch at high process temperature with integrally woven fins. The fins are 2.5 cm long and 1 mm thick, and provide an extended radiating surface at the colder condenser section of the heat pipe. The weave pattern features a continuous fiber bath from the inner tube surface to the outside edges of the fins to maximize the thermal conductance, and to thus minimize the temperature drop at the condenser end. The heat pipe and radiator element together are less than one-third the mass of conventional heat pipes of the same heat rejection surface area. To prevent the molten potassium working fluid from eroding the C C heat pipe wall, the shell is lined with a thin-walled, metallic tube liner (Nb-1 wt.% Zr), which is an integral part of a hermetic metal subassembly which is furnace-brazed to the inner surface of the C-C tube. The hermetic metal liner subassembly includes end caps and fill tubes fabricated from the same Nb-1Zr alloy. A combination of laser and electron beam methods is used to weld the end caps and fill tubes. A tungsten/inert gas weld seals the fill tubes after cleaning and charging the heat pipes with potassium. The external section of this liner, which was formed by a "Uniscan" rolling process, transitions to a larger wall thickness. This section, which protrudes beyond the C-C shell, constitutes the "evaporator" part of the heat pipe, while the section inside the shell constitutes the condenser of the heat pipe (see figure).

  14. Pipe connector

    International Nuclear Information System (INIS)

    Sullivan, T.E.; Pardini, J.A.

    1978-01-01

    A safety test facility for testing sodium-cooled nuclear reactor components includes a reactor vessel and a heat exchanger submerged in sodium in the tank. The reactor vessel and heat exchanger are connected by an expansion/deflection pipe coupling comprising a pair of coaxially and slidably engaged tubular elements having radially enlarged opposed end portions of which at least a part is of spherical contour adapted to engage conical sockets in the ends of pipes leading out of the reactor vessel and in to the heat exchanger. A spring surrounding the pipe coupling urges the end portions apart and into engagement with the spherical sockets. Since the pipe coupling is submerged in liquid a limited amount of leakage of sodium from the pipe can be tolerated

  15. Methodology for Life Testing of Refractory Metal / Sodium Heat Pipes

    International Nuclear Information System (INIS)

    Martin, James J.; Reid, Robert S.

    2006-01-01

    This work establishes an approach to generate carefully controlled data to find heat pipe operating life with material-fluid combinations capable of extended operation. To accomplish this goal acceleration is required to compress 10 years of operational life into 3 years of laboratory testing through a combination of increased temperature and mass fluence. Specific test series have been identified, based on American Society for Testing and Materials (ASTM) specifications, to investigate long-term corrosion rates. The refractory metal selected for demonstration purposes is a molybdenum-44.5% rhenium alloy formed by powder metallurgy. The heat pipes each have an annular crescent wick formed by hot isostatic pressing of molybdenum-rhenium wire mesh. The heat pipes are filled by vacuum distillation with purity sampling of the completed assembly. Round-the-clock heat pipe tests with 6-month destructive and non-destructive inspection intervals are conducted to identify the onset and level of corrosion. Non-contact techniques are employed to provide power to the evaporator (radio frequency induction heating at 1 to 5 kW per heat pipe) and calorimetry at the condenser (static gas gap coupled water cooled calorimeter). The planned operating temperature range extends from 1123 to 1323 K. Accomplishments before project cancellation included successful development of the heat pipe wick fabrication technique, establishment of all engineering designs, baseline operational test requirements, and procurement/assembly of supporting test hardware systems. (authors)

  16. Experimental and analytical study on cesium iodide behavior in piping in wave experiment

    Energy Technology Data Exchange (ETDEWEB)

    Hidaka, A; Igarashi, M; Hashimoto, K; Sugimoto, J [Japan Atomic Energy Research Inst., Dep. of Reactor Safety Research, Tokai-mura (Japan); Yoshino, T [Toshiba Advanced System Corp., Isago Kawasaki-ku (Japan)

    1996-12-01

    The WAVE (Wide range Aerosol model VErification) experiments have been performed at JAERI to investigate cesium iodide (CsI) deposition onto an inner surface of piping wall under typical severe accident conditions. The test facility consists of a dish containing CsI powder, electrical heaters and a straight pipe of 1.5 m in length with diameter of 0.042m. Nitrogen gas and superheated steam were injected into the pipe to carry the vaporized CsI and to simulate the thermohydraulic condition for the PWR hot-leg inlet. Analyses of the experiments have been conducted with a three-dimensional thermohydraulic code, SPRAC and the radionuclide behavior analysis codes, ART and VICTORIA. A clear difference was found in the deposition behavior between nitrogen and steam conditions as carrier gases. For nitrogen gas, the analyses well reproduced the experimental results by closely coupling the CsI behavior and the detailed thermohydraulic analyses. For steam carrier gas, on the contrary, the experimental results could not be well reproduced without the use of larger aerosol size. Since the observed enhancement of aerosol size in superheated steam cannot be explained by existing models, it is necessary to further investigate this mechanisms by experiment and analysis. (author) 34 figs., 23 refs.

  17. Alternate procedures for the seismic analysis of multiply supported piping systems

    International Nuclear Information System (INIS)

    Subudhi, M.; Bezler, P.

    1985-01-01

    The seismic design of secondary systems such as piping requires knowledge of the motions at various locations of the primary structures. When the structure or buildings are subjected to earthquake-like excitations at the ground level, the responses at different floor levels may be quite different from each other. This difference depends on the building and soil frequency characteristics, the characteristics of the input signals, the damping levels, and soil-structure interaction effects. When multiple independent excitations are considered in the analysis of piping systems, the responses can be considered to have two distinct components. One is due to the inertia of masses alone (dynamic component) and the other is due to the time varying differential motion of the support points (pseudo-static component). To address this problem, a sample of six piping systems, two of which were subjected to thirty-three earthquakes, were studied to develop a statistical assessment of different methods of predicting the dynamic, pseudo-static and combined response. Both uniform and independent support motion methods were considered. The results are obtained in tabular form. The mean and standard deviation for the two piping systems subjected to thirty-three earthquakes were obtained to allow an assessment of the adequacy and level of conservatism associated with each method. These results are also displayed in graphical form for selected, critical locations in the piping systems. The limitations of each method and recommendations are discussed

  18. Altitude Performance Characteristics of Turbojet-engine Tail-pipe Burner with Variable-area Exhaust Nozzle Using Several Fuel Systems and Flame Holders

    Science.gov (United States)

    Johnson, Lavern A; Meyer, Carl L

    1950-01-01

    A tail-pipe burner with a variable-area exhaust nozzle was investigated. From five configurations a fuel-distribution system and a flame holder were selected. The best configuration was investigated over a range of altitudes and flight Mach numbers. For the best configuration, an increase in altitude lowered the augmented thrust ratio, exhaust-gas total temperature, and tail-pipe combustion efficiency, and raised the specific fuel consumption. An increase in flight Mach number raised the augmented thrust ratio but had no apparent effect on exhaust-gas total temperature, tail-pipe combustion efficiency, or specific fuel consumption.

  19. A novel radial anode layer ion source for inner wall pipe coating and materials modification--hydrogenated diamond-like carbon coatings from butane gas.

    Science.gov (United States)

    Murmu, Peter P; Markwitz, Andreas; Suschke, Konrad; Futter, John

    2014-08-01

    We report a new ion source development for inner wall pipe coating and materials modification. The ion source deposits coatings simultaneously in a 360° radial geometry and can be used to coat inner walls of pipelines by simply moving the ion source in the pipe. Rotating parts are not required, making the source ideal for rough environments and minimizing maintenance and replacements of parts. First results are reported for diamond-like carbon (DLC) coatings on Si and stainless steel substrates deposited using a novel 360° ion source design. The ion source operates with permanent magnets and uses a single power supply for the anode voltage and ion acceleration up to 10 kV. Butane (C4H10) gas is used to coat the inner wall of pipes with smooth and homogeneous DLC coatings with thicknesses up to 5 μm in a short time using a deposition rate of 70 ± 10 nm min(-1). Rutherford backscattering spectrometry results showed that DLC coatings contain hydrogen up to 30 ± 3% indicating deposition of hydrogenated DLC (a-C:H) coatings. Coatings with good adhesion are achieved when using a multiple energy implantation regime. Raman spectroscopy results suggest slightly larger disordered DLC layers when using low ion energy, indicating higher sp(3) bonds in DLC coatings. The results show that commercially interesting coatings can be achieved in short time.

  20. A simplified LBB evaluation procedure for austenitic and ferritic steel piping

    International Nuclear Information System (INIS)

    Gamble, R.M.; Wichman, K.R.

    1997-01-01

    The NRC previously has approved application of LBB analysis as a means to demonstrate that the probability of pipe rupture was extremely low so that dynamic loads associated with postulated pipe break could be excluded from the design basis (1). The purpose of this work was to: (1) define simplified procedures that can be used by the NRC to compute allowable lengths for circumferential throughwall cracks and assess margin against pipe fracture, and (2) verify the accuracy of the simplified procedures by comparison with available experimental data for piping having circumferential throughwall flaws. The development of the procedures was performed using techniques similar to those employed to develop ASME Code flaw evaluation procedures. The procedures described in this report are applicable to pipe and pipe fittings with: (1) wrought austenitic steel (Ni-Cr-Fe alloy) having a specified minimum yield strength less than 45 ksi, and gas metal-arc, submerged arc and shielded metal-arc austentic welds, and (2) seamless or welded wrought carbon steel having a minimum yield strength not greater than 40 ksi, and associated weld materials. The procedures can be used for cast austenitic steel when adequate information is available to place the cast material toughness into one of the categories identified later in this report for austenitic wrought and weld materials

  1. A serviceability approach for carbon steel piping to intermittent high temperatures

    International Nuclear Information System (INIS)

    Ratiu, M.D.; Moisidis, N.T.

    1996-01-01

    Carbon steel piping (e.g., ASME SA-106, SA-53), is installed in many industrial applications (i.e. diesel generator at NPP) where the internal gas flow subjects the piping to successive short time exposures at elevated temperatures up to 1,100 F. A typical design of this piping without consideration for creep-fatigue cumulative damage is at least incomplete if not inappropriate. Also, a design for creep-fatigue, usually employed for long-term exposure to elevated temperatures, would be too conservative and will impose replacement of the carbon steel piping with heat-resistant CrMo steel piping. The existing ASME Standard procedures do not explicitly provide acceptance criteria for the design qualification to withstand these intermittent exposures to elevated temperatures. The serviceability qualification proposed is based on the evaluation of equivalent full temperature cycles which are presumed/expected to be experienced by the exhaust piping during the design operating life of the diesel engine. The proposed serviceability analysis consists of: (a) determination of the permissible stress at elevated temperatures, and (b) estimation of creep-fatigue damage for the total expected cycles of elevated temperature exposures following the procedure provided in ASME Code Cases N-253-6 and N-47-28

  2. A simplified LBB evaluation procedure for austenitic and ferritic steel piping

    Energy Technology Data Exchange (ETDEWEB)

    Gamble, R.M.; Wichman, K.R.

    1997-04-01

    The NRC previously has approved application of LBB analysis as a means to demonstrate that the probability of pipe rupture was extremely low so that dynamic loads associated with postulated pipe break could be excluded from the design basis (1). The purpose of this work was to: (1) define simplified procedures that can be used by the NRC to compute allowable lengths for circumferential throughwall cracks and assess margin against pipe fracture, and (2) verify the accuracy of the simplified procedures by comparison with available experimental data for piping having circumferential throughwall flaws. The development of the procedures was performed using techniques similar to those employed to develop ASME Code flaw evaluation procedures. The procedures described in this report are applicable to pipe and pipe fittings with: (1) wrought austenitic steel (Ni-Cr-Fe alloy) having a specified minimum yield strength less than 45 ksi, and gas metal-arc, submerged arc and shielded metal-arc austentic welds, and (2) seamless or welded wrought carbon steel having a minimum yield strength not greater than 40 ksi, and associated weld materials. The procedures can be used for cast austenitic steel when adequate information is available to place the cast material toughness into one of the categories identified later in this report for austenitic wrought and weld materials.

  3. SEALING LARGE-DIAMETER CAST-IRON PIPE JOINTS UNDER LIVE CONDITIONS

    Energy Technology Data Exchange (ETDEWEB)

    Kiran M. Kothari; Gerard T. Pittard

    2003-06-01

    Utilities in the U.S. operate over 75,000 km (47,000 miles) of old cast-iron pipes for gas distribution. The bell-and-spigot joints tend to leak as these pipes age. Current repair practices are costly and highly disruptive. The objective of this program is to design, test and commercialize a robotic system capable of sealing multiple cast-iron bell and spigot joints from a single pipe entry point. The proposed system will perform repairs while the pipe remains in service by traveling through the pipe, cleaning each joint surface, and attaching a stainless-steel sleeve lined with an epoxy-impregnated felt across the joint. This approach will save considerable time and labor, avoid traffic disruption, and eliminate any requirement to interrupt service (which results in enormous expense to utilities). Technical challenges include: (1) repair sleeves must compensate for diametric variation and eccentricity of cast-iron pipes; (2) the assembly must travel long distances through pipes containing debris; (3) the pipe wall must be effectively cleaned in the immediate area of the joint to assure good bonding of the sleeve; and (4) an innovative bolt-on entry fitting is required to conduct repair operations on live mains. The development effort is divided into eleven tasks. Task 1-Program Management was previously completed. Two reports, one describing the program management plan and the other consisting of the technology assessment, were submitted to the DOE COR in the first quarter. Task 2-Establishment of Detailed Design Specifications and Task 3-Design and Fabricate Ratcheting Stainless-Steel Repair Sleeves are now well underway. First-quarter activities included conducting detailed analyses to determine the capabilities of coiled-tubing locomotion for entering and repairing gas mains and the first design iteration of the joint-sealing sleeve. The maximum horizontal reach of coiled tubing inside a pipeline before buckling prevents further access was calculated for a wide

  4. Analysis of a piping system under seismic load using incremental hinge technique

    International Nuclear Information System (INIS)

    Ravi Kiran, A.; Agrawal, M.K.; Reddy, G.R.; Singh, R.K.; Vaze, K.K.; Ghosh, A.K.; Kushwaha, H.S.; Ramesh Babu, R.

    2008-01-01

    ASME Boiler and Pressure Vessel Code treats piping system as a series of components but not as an overall structural system. Limit analyses and collapse tests at component level are used to establish stress allowables on seismic stresses. The code does not consider the load redistributions and structural redundancy existing in piping systems that prevent system collapse even when one or more individual components loaded beyond their collapse levels. This necessitates a simple analytical method for evaluation of inelastic seismic response at system level. The present paper presents a simplified analytical procedure for predicting inelastic response of a typical piping system subjected to seismic load. The analytical method known as incremental hinge technique is based on plastic system behavior in which the yielded components are replaced with hinge models when a critical hinge moment is reached. It also takes into account the inelastic response spectrum reduction factors and displacement ductility. The analytical method is used to obtain the inelastic response, location of hinge formation and level of base excitation needed for hinge formation. The predicted hinge locations and hinge ordering is compared with the results of a shake table test conducted on the piping system. (author)

  5. Criteria for accepting piping thermal expansion movements during FFTF plant startup

    International Nuclear Information System (INIS)

    Clark, G.L.; Anderson, M.J.

    1981-03-01

    A deflection measurement program was conducted as a final step in the design qualification of the Fast Flux Test Facility liquid sodium piping. Measurements were obtained from the ambient empty position, through the 400 0 F (204 0 C) sodium fill, to an 800 0 F (427 0 C) maximum iso-thermal test condition. The program was designed to confirm that the pipe responded as predicted under both deadweight and thermal expansion loads. This paper describes the design of the test programs; the criteria used to select appropriate measurement locations from the approximately 4000 supports used on this pipe; and the criteria used to accept test results

  6. Effect of flow conditions on flow accelerated corrosion in pipe bends

    International Nuclear Information System (INIS)

    Mazhar, H.; Ching, C.Y.

    2015-01-01

    Flow Accelerated Corrosion (FAC) in piping systems is a safety and reliability problem in the nuclear industry. In this study, the pipe wall thinning rates and development of surface roughness in pipe bends are compared for single phase and two phase annular flow conditions. The FAC rates were measured using the dissolution of test sections cast from gypsum in water with a Schmidt number of 1280. The change in location and levels of maximum FAC under single phase and two phase flow conditions are examined. The comparison of the relative roughness indicates a higher effect for the surface roughness in single phase flow than in two phase flow. (author)

  7. Gas-liquid two-phase flow behavior in terrain-inclined pipelines for gathering transport system of wet natural gas

    DEFF Research Database (Denmark)

    Yang, Yan; Li, Jingbo; Wang, Shuli

    2018-01-01

    The Volume of Fluid method and Re-Normalisation Group (RNG) k-ε turbulence model were employed to predict the gas-liquid two-phase flow in a terrain-inclined pipeline with deposited liquids. The simulation was carried out in a 22.5 m terrain-inclined pipeline with a 150 mm internal diameter...... on the liquid level under the suction force which caused by the negative pressure around the elbow, and then it touched to the top of the pipe. When the liquid blocked the pipe, the pressure drop between the upstream and downstream of the elbow increased with the increase of the gas velocity. At larger gas...

  8. View of industry on the impact of pipe break criteria

    International Nuclear Information System (INIS)

    Bernsen, S.A.

    1983-01-01

    Historically, large pipe breaks in the types of materials used and under operating conditions similar to those in light water reactor service have not occurred. Nevertheless, the non-mechanistic assumption of a double ended pipe break of the early sixties, selected for loss of coolant accident analysis purposes, has become a mechanistic criterion for the design and arrangement of high pressure piping systems and their associated supports and enclosures in today's nuclear plants. While it seems reasonable and appropriate to continue to design the Emergency Core Cooling Systems for a range of loss of coolant accidents up to and including those that approximate the area of the largest pipe connected to the reactor vessel and to use this break in determining the loading and temperature rise rate for containment structures and equipment qualification, it no longer seems reasonable to provide precisely engineered break protection for a limited number of potential pipe break locations. This observation is gaining increasing support, particularly as engineering judgment and historical perspectives are being supplemented by both deterministic and probabilistic studies that indicate the potential for large instantaneous breaks in nuclear grade piping systems is virtually incredible. Fracture mechanics analyses support leak-before-break assumptions with wide margins and probabilistic studies indicate potentials for double-ended pipe breaks in the range of less than one in a billion years

  9. U-rans model for the prediction of the acoustic sound power generated in a whistling corrugated pipe

    NARCIS (Netherlands)

    Golliard, J.; González Díez, N.; Belfroid, S.P.C.; Nakiboǧlu, G.; Hirschberg, A.

    2013-01-01

    Corrugated pipes, as used in flexible risers for gas production or in domestic appliances, can whistle when a flow is imposed through the pipe. Nakiboglu et al [1, 2] have developed a method to compute the acoustic source term for axi-symmetric cavities. The method is based on the resolution of

  10. Pipe damping

    International Nuclear Information System (INIS)

    Ware, A.G.; Arendts, J.G.

    1984-01-01

    A program has been developed to assess the available piping damping data, to generate additional data and conduct seperate effects tests, and to establish a plan for reporting and storing future test results into a data bank. This effort is providing some of the basis for developing higher allowable damping values for piping seismic analyses, which will potentially permit removal of a considerable number of piping supports, particularly snubbers. This in turn will lead to more flexible piping systems which will be less susceptible to thermal cracking, will be easier to maintain and inspect, as well as less costly

  11. Visualization of two-phase flow in metallic pipes using neutron radiographic technique

    International Nuclear Information System (INIS)

    Luiz, L.C.; Crispim, V.R.

    2007-01-01

    The study of two-phase flow is a matter of great interest both for the engineering and oil industries. The production of oil and natural gas involves the transportation of fluids in their liquid and gaseous states, respectively, to the processing plant for refinement. The forecasting of two-phase flow in oil pipes is of the utmost important yet an extremely difficult task. With the development of the electronic imaging system, installed in J-9 irradiation channel of the IEN/CNEN Argonauta Reactor, it is possible to visualize the different types of two phase air-water flows in small-diameter metallic pipes. After developing the captured image the liquid-gas drift flux correlation as well as the void fraction in relation to the injected air outflow for a fixed water outflow can be obtained. (author)

  12. Insulated pipe clamp design

    International Nuclear Information System (INIS)

    Anderson, M.J.; Hyde, L.L.; Wagner, S.E.; Severud, L.K.

    1980-01-01

    Thin wall large diameter piping for breeder reactor plants can be subjected to significant thermal shocks during reactor scrams and other upset events. On the Fast Flux Test Facility, the addition of thick clamps directly on the piping was undesired because the differential metal temperatures between the pipe wall and the clamp could have significantly reduced the pipe thermal fatigue life cycle capabilities. Accordingly, an insulated pipe clamp design concept was developed. The design considerations and methods along with the development tests are presented. Special considerations to guard against adverse cracking of the insulation material, to maintain the clamp-pipe stiffness desired during a seismic event, to minimize clamp restraint on the pipe during normal pipe heatup, and to resist clamp rotation or spinning on the pipe are emphasized

  13. Fundamentals of piping design

    CERN Document Server

    Smith, Peter

    2013-01-01

    Written for the piping engineer and designer in the field, this two-part series helps to fill a void in piping literature,since the Rip Weaver books of the '90s were taken out of print at the advent of the Computer Aid Design(CAD) era. Technology may have changed, however the fundamentals of piping rules still apply in the digitalrepresentation of process piping systems. The Fundamentals of Piping Design is an introduction to the designof piping systems, various processes and the layout of pipe work connecting the major items of equipment forthe new hire, the engineering student and the vetera

  14. Four-port gas separation membrane module assembly

    Science.gov (United States)

    Wynn, Nicholas P.; Fulton, Donald A.; Lokhandwala, Kaaeid A.; Kaschemekat, Jurgen

    2010-07-20

    A gas-separation membrane assembly, and a gas-separation process using the assembly. The assembly incorporates multiple gas-separation membranes in an array within a single vessel or housing, and is equipped with two permeate ports, enabling permeate gas to be withdrawn from both ends of the membrane module permeate pipes.

  15. Test results of a jet impingement from a 4 inch pipe under BWR LOCA conditions

    International Nuclear Information System (INIS)

    Isozaki, Toshikuni; Yano, Toshikazu; Miyazaki, Noriyuki; Kato, Rokuro; Kurihara, Ryoichi; Ueda, Shuzo; Miyazono, Shohachiro

    1982-09-01

    Hypothetical instantaneous pipe rupture is now considered to be one of the design basis accidents during the operation of the light water reactor. If a pipe rupture accidnet occurs, the pipe will start moving with the sudden discharge of internal fluid. So, the various apparatus such as pipe whip restraints and jet deflectors are being installed near the postulated break location to protect the nuclear power plants against the effect of postulated pipe rupture. Pipe whipping test and jet discharge test are now being conducted at the Division of Reactor Safety of the Japan Atomic Energy Research Institute. This report describes the test results of the jet discharge from a 4 inch pipe under BWR LOCA condition. In front of the pipe exit the target disk of 1000 mm in diameter was installed. The distance between the pipe exit and the target was 500 mm. 13 pressure transducers and 13 thermocouples were mounted on the target disk to measure the pressure and temperature increase due to jet impingement on the target. (author)

  16. Woc 5 distribution. Report of study group 5.1 ''service pipes''; Rapport du groupe de travail 5.1 ''branchements''

    Energy Technology Data Exchange (ETDEWEB)

    Sircar, A.; Hec, D.

    2000-07-01

    Service pipes are constitute an important link in the gas distribution chain. By their numbers, their relative weakness against third party aggressions and due to the fact that they constitute in most cases the limit of responsibility between the gas company network and customers' installations, service pipes have been identified as a technical and economical key issue for the gas industry development. This document analyses technical and economical data dealing with domestic service pipes having a maximum flow rate of 10 m3/h collected from 42 gas companies spread over 22 countries. All service pipes elements, from the connection with the distribution network up to the delivery point, are analysed emphasizing their layouts and design, the materials used, the construction techniques, the operating and maintenance policies and a few rehabilitation techniques. The main different technical solutions given by the gas companies have been compared in order for the study group to draw up some recommendations regarding the best practices in terms of safety, ease of maintenance and economical savings. (author)

  17. Heat Pipe with Axial Wick

    Science.gov (United States)

    Ambrose, Jay H. (Inventor); Holmes, Rolland (Inventor)

    2016-01-01

    A heat pipe has an evaporator portion, a condenser portion, and at least one flexible portion that is sealingly coupled between the evaporator portion and the condenser portion. The flexible portion has a flexible tube and a flexible separator plate held in place within the flexible tube so as to divide the flexible tube into a gas-phase passage and a liquid-phase artery. The separator plate and flexible tube are configured such that the flexible portion is flexible in a plane that is perpendicular to the separator plate.

  18. Development of New Technology for Leak Detection of a Buried Pipe

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, D. B.; Park, J. H.; Moon, S. S.; Han, S. W.; Kang, T.; Kim, H. J.

    2014-01-15

    The importance of the leak detection of a buried pipe in a power plant of Korea is being emphasized as the buried pipes of a power plant are more than 20 years old. The first objective of this work is to develop new technologies for leak detection of a buried pipe. The second objective is to design and fabricate a trial product of leakage detection system for buried pipe. To achieve these purposes, as a first step, literature survey of the leak detection methods and techniques has been performed. As an algorithm for enhancing the leak detection capability of newly developed leakage detection system, an algorithm for removing mechanical noise and reflected wave within the pipe has been developed, and its feasibility was verified by performing numerical simulations and experiments. The hardware for leakage detection system is designed as a portable type by considering the test environment of a power plant, where speedy leakage inspection and rapid movement/reinstallation of the inspection equipment is necessary. The software is designed to provide a user-friendly GUI(Graphic User Interface) environment, making the system setup and data display quick and easy. It is also designed to allow for a real time visualization of analysis results on a monitoring screen for an estimation of the leakage location. The feature of the developed leak detection system is that it equipped with noise rejection algorithms that can effectively enhance the leak detection capability in a noisy environment. Then, a trial product of the leakage detection system has been fabricated, and its functionality and capability were verified by field experiments. The experimental results demonstrated that even in a noisy environment, the developed system can provide more reliable means for estimating the leak location of the buried pipe. It is expected that the reliability of leakage point estimation can be enhanced when the developed leak detection system is applied to a leakage estimation problem

  19. Development of New Technology for Leak Detection of a Buried Pipe

    International Nuclear Information System (INIS)

    Yoon, D. B.; Park, J. H.; Moon, S. S.; Han, S. W.; Kang, T.; Kim, H. J.

    2014-01-01

    The importance of the leak detection of a buried pipe in a power plant of Korea is being emphasized as the buried pipes of a power plant are more than 20 years old. The first objective of this work is to develop new technologies for leak detection of a buried pipe. The second objective is to design and fabricate a trial product of leakage detection system for buried pipe. To achieve these purposes, as a first step, literature survey of the leak detection methods and techniques has been performed. As an algorithm for enhancing the leak detection capability of newly developed leakage detection system, an algorithm for removing mechanical noise and reflected wave within the pipe has been developed, and its feasibility was verified by performing numerical simulations and experiments. The hardware for leakage detection system is designed as a portable type by considering the test environment of a power plant, where speedy leakage inspection and rapid movement/reinstallation of the inspection equipment is necessary. The software is designed to provide a user-friendly GUI(Graphic User Interface) environment, making the system setup and data display quick and easy. It is also designed to allow for a real time visualization of analysis results on a monitoring screen for an estimation of the leakage location. The feature of the developed leak detection system is that it equipped with noise rejection algorithms that can effectively enhance the leak detection capability in a noisy environment. Then, a trial product of the leakage detection system has been fabricated, and its functionality and capability were verified by field experiments. The experimental results demonstrated that even in a noisy environment, the developed system can provide more reliable means for estimating the leak location of the buried pipe. It is expected that the reliability of leakage point estimation can be enhanced when the developed leak detection system is applied to a leakage estimation problem

  20. Gas turbines with complete continuous combustion of the fuels

    Energy Technology Data Exchange (ETDEWEB)

    Koch, C

    1976-10-21

    The invention concerns a gas turbine plant with complete continuous combustion of the fuel. The fuel is taken to a gas generator in which the preheated fuel is catalytically converted at high temperature in a fuel mixture using an oxygen carrier. Heating of the fuel takes place in a heat exchanger which is situated in the outlet pipe of the turbine. The efficiency is increased and the emission of noxious gas is kept as low as possible using the heat exchanger as a fuel evaporator and by using part of the waste formed in the combustion chamber to carry oxygen to the gas generator via an outlet pipe.

  1. Safety distance between underground natural gas and water pipeline facilities

    International Nuclear Information System (INIS)

    Mohsin, R.; Majid, Z.A.; Yusof, M.Z.

    2014-01-01

    A leaking water pipe bursting high pressure water jet in the soil will create slurry erosion which will eventually erode the adjacent natural gas pipe, thus causing its failure. The standard 300 mm safety distance used to place natural gas pipe away from water pipeline facilities needs to be reviewed to consider accidental damage and provide safety cushion to the natural gas pipe. This paper presents a study on underground natural gas pipeline safety distance via experimental and numerical approaches. The pressure–distance characteristic curve obtained from this experimental study showed that the pressure was inversely proportional to the square of the separation distance. Experimental testing using water-to-water pipeline system environment was used to represent the worst case environment, and could be used as a guide to estimate appropriate safety distance. Dynamic pressures obtained from the experimental measurement and simulation prediction mutually agreed along the high-pressure water jetting path. From the experimental and simulation exercises, zero effect distance for water-to-water medium was obtained at an estimated horizontal distance at a minimum of 1500 mm, while for the water-to-sand medium, the distance was estimated at a minimum of 1200 mm. - Highlights: • Safe separation distance of underground natural gas pipes was determined. • Pressure curve is inversely proportional to separation distance. • Water-to-water system represents the worst case environment. • Measured dynamic pressures mutually agreed with simulation results. • Safe separation distance of more than 1200 mm should be applied

  2. Instationary discharge rates and shear factors in pipe ruptures

    International Nuclear Information System (INIS)

    Pana, P.

    1976-01-01

    The loads observed in ruptures of steam- or water-conducting pipes may occur as reactive forces on the pipes themselves or as jet forces on the structural components adjacent to the point of rupture. The present paper deals with the instationary acceleration phase directly after rupture. The general laws of conservation (mass, energy, momentum) may be used, but in their instationary form. This results in a system of partial differential equations which does not provide a comprehensive mathematical solution. However, since efficient electronic computer systems are available, difference methods are increasingly often used. Such calculations were carried out for water-steam as an ideal gas and under simplifying assumptions. (orig./AK) [de

  3. Investigations on penetration control for automated pipe welding system

    International Nuclear Information System (INIS)

    Fujiki, Daisuke; Sato, Akihiro; Funamoto, Takao; Matsumoto, Toshimi; Kobayashi, Masahiro

    1995-01-01

    We have been investigating process conditions forming sound root bead by orbital welding technique for nuclear power stations. Specimens used were stainless steel (SUS304) pipes (318.5 mm outside diameter and 15.4 mm thickness), and pulsed gas tungsten-arc (GTA) welder was adopted. We have found process conditions to form sound root bead by changing both heat input conditions and joint designs. It is found that reducing volume of molten metal is necessary to form sound root bead. And it is also found that changing joint designs is effective to reduce volume of molten metal. By selecting proper joint designs, we could form sound root bead in constant heat input conditions in every position of pipe. (author)

  4. State observers for monitoring gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Chapman, M.J.; Jones, R.P.; Pritchard, A.J.

    1987-03-01

    This paper describes work performed on collaboration with the British Gas Corporation in relation to the development of algorithms for monitoring the condition of high-pressure gas pipelines. The practical problem considered is that of reconstructing the pressure profile along a single length of pipe from pressure measurements at the end points and a further measurement at an intermediate point along the pipe. The approach adopted is based on the implementation of a finite-dimensional asymptotic state observer derived from consideration of the distributed-parameter properties of the system. The paper includes the results of a computational study in which the observer was evaluated against experimental data corresponding to an 80 km section of pipe. These results indicate that the dynamic observer is capable of providing an accurate estimate of the pressure profile over a complete 24 h demand cycle. 5 refs. (authors).

  5. Validation and Application of Computed Radiography (CR) Tangential Technique for Wall Thickness Measurement of 10 Inch Carbon Steel Pipe

    International Nuclear Information System (INIS)

    Norhazleena Azaman; Khairul Anuar Mohd Salleh; Amry Amin Abas; Arshad Yassin; Sukhri Ahmad

    2016-01-01

    Oil and gas industry requires Non Destructive Testing (NDT) to ensure each components, in-service and critical, are fit-for-purpose. Pipes that are used to transfer oil or gas are amongst the critical component that needs to be well maintained and inspected. Typical pipe discontinuities that may lead to unintended incidents are erosion, corrosion, dent, welding defects, etc. Wall thickness assessment, with Radiography Testing (RT) is normally used to inspect such discontinuities and can be performed with two approaches; (a) center line beam tangential technique (b) offset from the centre pipe tangential technique. The latter is a method of choice for this work because of the pipe dimension and limited radiation safe distance at site. Two successful validation approaches (simulation and experimental) were performed to determine the probability of successfulness before the actual RT work with tangential technique is carried out. The pipe was a 10 inch diameter in-service wrapped carbon steel. A 9 Ci Ir-192 and white Imaging Plate (IP) were used as a gamma radiation source and to record the radiographic image. Result of this work suggest that RT with tangential technique for 10 inch wrapped in-service carbon steel pipe can be successfully performed. (author)

  6. Study on production mechanism of welding residual stress at the juncture of a pipe penetrating a thick plate

    International Nuclear Information System (INIS)

    Mochizuki, Masahito; Enomoto, Kunio; Okamoto, Noriaki; Saitoh, Hideyo; Hayashi, Eisaku.

    1994-01-01

    This paper studies welding residual stresses at the intersection of a small diameter pipe penetrating a thick plate. The pipe is welded to the plate, and Tungsten Innert Gas (TIG) cladding is melted on the inner surface of the pipe to protect it from stress corrosion cracking due to long operation in nuclear power plants. Stresses are calculated by heat conduction analysis and thermal elasto-plastic analysis, and also measured by strain gauges. Welding residual stresses are shown to have no corrosive influence on the inner pipe surface, and the stresses are compressed enough to protect the pipe against stress corrosion cracking on the outer surface. It was also studied to make clear the production mechanism of the residual stresses which were generated by welding processes at the pipe. (author)

  7. Critical element development of standard pipe connector for remote handling

    International Nuclear Information System (INIS)

    Taguchi, Kou; Kakudate, Satoshi; Kanamori, Naokazu; Oka, Kiyoshi; Nakahira, Masataka; Obara, Kenjiro; Tada, Eisuke; Shibanuma, Kiyoshi; Seki, Masahiro

    1994-08-01

    In fusion experimental reactors such as ITER, the in-vessel components such as blanket and divertor are actively cooled and a large number of cooling pipes are located around the core of reactor, where personnel access is prohibited. Mechanical pipe connectors are highly required as standard components for easy and reliable connection/disconnection of cooling pipe by remote handling. For this purpose, a clamping chain type connector has been developed with special mechanisms such as plate springs and guide structures so as to enable concentric and axial movement of clamping chain for easy mounting and dismounting. The basic performance test of a prototypical connector for a 80-A pipe shows sufficient leak tightness and proof pressure capability as well as simple connection/disconnection operation. In addition to the clamp chain type connector, design efforts have been made to develop a quick coupling type connector and a preliminary model of air-actuated quick connector has been fabricated for further investigations. This paper gives the design concept of mechanical pipe connectors such as clamping chain type and quick coupler type, and the basic performance tests results of clamping chain type connector. (author)

  8. A novel numerical model for estimating the collapse pressure of flexible pipes

    Energy Technology Data Exchange (ETDEWEB)

    Nogueira, Victor P.P.; Antoun Netto, Theodoro [Universidade Federal do Rio de Janeiro (COPPE/UFRJ), RJ (Brazil). Coordenacao dos Programas de Pos-graduacao em Engenharia], e-mail: victor@lts.coppe.ufrj.br

    2009-07-01

    As the worldwide oil and gas industry operational environments move to ultra-deep waters, failure mechanisms in flexible pipes such as instability of the armor layers under compression and hydrostatic collapse are more likely to occur. Therefore, it is important to develop reliable numerical tools to reproduce the failure mechanisms that may occur in flexible pipes. This work presents a representative finite element model of flexible pipe capable to reproduce its pre and post-collapse behavior under hydrostatic pressure. The model, developed in the scope of this work, uses beam elements and includes nonlinear kinematics and material behavior influences. The dependability of the numerical results is assessed in light of experimental tests on flexible pipes with 4 inches and 8 inches nominal diameter available in the literature (Souza, 2002). The applied methodology provided coherent values regarding the estimation of the collapse pressures and results have shown that the proposed model is capable to reproduce experimental results. (author)

  9. A hybrid thermal video and FTIR spectrometer system for rapidly locating and characterizing gas leaks

    Science.gov (United States)

    Williams, David J.; Wadsworth, Winthrop; Salvaggio, Carl; Messinger, David W.

    2006-08-01

    Undiscovered gas leaks, known as fugitive emissions, in chemical plants and refinery operations can impact regional air quality and present a loss of product for industry. Surveying a facility for potential gas leaks can be a daunting task. Industrial leak detection and repair programs can be expensive to administer. An efficient, accurate and cost effective method for detecting and quantifying gas leaks would both save industries money by identifying production losses and improve regional air quality. Specialized thermal video systems have proven effective in rapidly locating gas leaks. These systems, however, do not have the spectral resolution for compound identification. Passive FTIR spectrometers can be used for gas compound identification, but using these systems for facility surveys is problematic due to their small field of view. A hybrid approach has been developed that utilizes the thermal video system to locate gas plumes using real time visualization of the leaks, coupled with the high spectral resolution FTIR spectrometer for compound identification and quantification. The prototype hybrid video/spectrometer system uses a sterling cooled thermal camera, operating in the MWIR (3-5 μm) with an additional notch filter set at around 3.4 μm, which allows for the visualization of gas compounds that absorb in this narrow spectral range, such as alkane hydrocarbons. This camera is positioned alongside of a portable, high speed passive FTIR spectrometer, which has a spectral range of 2 - 25 μm and operates at 4 cm -1 resolution. This system uses a 10 cm telescope foreoptic with an onboard blackbody for calibration. The two units are optically aligned using a turning mirror on the spectrometer's telescope with the video camera's output.

  10. Improvement activities to soil stabilization near Bolivia-Brazil gas pipeline crossing through an embankment over a corrugated drainage pipe, at Km 247 in Mato Grosso do Sul, Brazil; Melhorias para estabilidade do gasoduto Bolivia-Brasil em cruzamento de aterro sobre tubo de drenagem tipo ARMCO, no km 247 em Mato Grosso do Sul

    Energy Technology Data Exchange (ETDEWEB)

    Jorge, Kemal Vieira [TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Rio de Janeiro, RJ (Brazil); Costa, Cesar Augusto [TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Campo Grande, MS (Brazil). Gerencia Regional Centro Oeste (CRGO)

    2005-07-01

    A hundred and seventy kilometers from Campo Grande city, on Mato Grosso do Sul State, the Brasil-Bolivia Gas Pipeline crosses a 8,5 meters high landfill, over a drainage systems made of a 2,8 meters of diameter corrugated pipe. This drainage pipe was installed to allow the drainage of the valley, and the landfill above it was built so the Gas pipeline could cross easier the 80 meters deep and 30 degree vertices valley. This paper illustrates the work tasks and solutions taken to monitor and guarantee the integrity of the drainage and landfill structures, as well as the integrity of the Gas Pipeline. Some of the work tasks illustrated are the investigation of the support conditions of the Gas Pipeline, the analysis of a drainage system under the pipeline, on a rocky soil, the analysis of the stability of the landfill, the construction of a gravity retaining walls and the monitoring of the deformations on the drainage pipe. (author)

  11. Heat pipe and method of production of a heat pipe

    International Nuclear Information System (INIS)

    Kemp, R.S.

    1975-01-01

    The heat pipe consists of a copper pipe in which a capillary network or wick of heat-conducting material is arranged in direct contact with the pipe along its whole length. Furthermore, the interior space of the tube contains an evaporable liquid for pipe transfer. If water is used, the capillary network consists of, e.g., a phosphorus band network. To avoid contamination of the interior of the heat pipe during sealing, its ends are closed by mechanical deformation so that an arched or plane surface is obtained which is in direct contact with the network. After evacuation of the interior space, the remaining opening is closed with a tapered pin. The ratio wall thickness/tube diameter is between 0.01 and 0.6. (TK/AK) [de

  12. Beam scrubbing of beam pipes during the first commissioning of SuperKEKB

    Science.gov (United States)

    Suetsugu, Y.; Shibata, K.; Ishibashi, T.; Kanazawa, K.; Shirai, M.; Terui, S.; Hisamatsu, H.

    2018-02-01

    The first (Phase-1) commissioning of SuperKEKB-an electron-positron collider with asymmetric energies located at KEK, in Tsukuba, Japan-started in February 2016, after more than five years of upgrading work on KEKB, and successfully ended in June of the same year. This paper describes one major task of Phase-1 commissioning: beam scrubbing the surface of the beam pipes, to prepare them for a sufficiently long beam lifetime and low background noise in the next commissioning, when a new particle detector will be installed. The pressure rises per unit beam current (dP/dI [Pa A-1]) were continuously monitored, and the coefficient of photon-stimulated desorption (PSD), η [molecules photon-1], was evaluated in the arc sections. The value of η decreased steadily with the beam dose, as expected. For arc sections in the positron ring, where most of the beam pipes were newly fabricated, the decrease in η against the photon dose (D) was similar to that previously reported; that is: η ∝ D-0.5 ∼ 0.8. At high storage beam currents, the evolution of η was affected by gas desorption resulting from the multipacting of electrons-that is, the electron cloud effect (ECE), which is a phenomenon particular to high-intensity positron rings. For the arc sections in the electron ring, η also decreased smoothly with the photon dose D, approximately as ∝ D-0.8. Given that most of these beam pipes were reused from KEKB, the value of η was much lower than that of the positron ring, and also lower than that of the electron ring of KEKB from the early stages of D. This implies that the surface of the reused beam pipes remembered the conditions in the KEKB, which is a known memory effect. The results obtained for η are compared with those obtained in various other accelerators.

  13. Experimental and numerical study of steel pipe with part-wall defect reinforced with fibre glass sleeve

    International Nuclear Information System (INIS)

    Mazurkiewicz, Lukasz; Tomaszewski, Michal; Malachowski, Jerzy; Sybilski, Kamil; Chebakov, Mikhail; Witek, Maciej; Yukhymets, Peter; Dmitrienko, Roman

    2017-01-01

    The paper presents numerical and experimental burst pressure evaluation of the gas seamless hot-rolled steel pipe. The main goal was to estimate mechanical toughness of pipe wrapped with composite sleeve and verify selected sleeve thickness. The authors used a nonlinear explicit FE code with constitutive models which allows for steel and composite structure failure modelling. Thanks to the achieved numerical and analytical results it was possible to perform the comparison with data received from a capacity test and good correlation between the results were obtained. Additionally, the conducted analyses revealed that local reduction of pipe wall thickness from 6 mm to 2.4 mm due to corrosion defect can reduce high pressure resistance by about 40%. Finally, pipe repaired by a fibre glass sleeve with epoxy resin with 6 mm thickness turned out more resistant than an original steel pipe considering burst pressure. - Highlights: • Numerical and experimental burst pressure evaluation of steel pipe was performed. • Seamless hot-rolled steel pipe with and without corrosion defect were considered. • Local reduction of pipe wall thickness from 6 to 2.4 mm reduces resistance by 40%. • Pipe repaired by a 6 mm fibre glass sleeve was more resistant than an original pipe.

  14. Pipe drafting and design

    CERN Document Server

    Parisher, Roy A; Parisher

    2000-01-01

    Pipe designers and drafters provide thousands of piping drawings used in the layout of industrial and other facilities. The layouts must comply with safety codes, government standards, client specifications, budget, and start-up date. Pipe Drafting and Design, Second Edition provides step-by-step instructions to walk pipe designers and drafters and students in Engineering Design Graphics and Engineering Technology through the creation of piping arrangement and isometric drawings using symbols for fittings, flanges, valves, and mechanical equipment. The book is appropriate primarily for pipe

  15. A compact low energy multibeam gamma-ray densitometer for pipe-flow measurements

    International Nuclear Information System (INIS)

    Tjugum, Stein-Arild; Frieling, Joop; Johansen, Geir Anton

    2002-01-01

    A compact low-energy multibeam gamma-ray densitometer for oil/water/gas pipe-flow measurement has been built at the University of Bergen. The instrument consists of one Am-241 source and three detectors, all collimated and embedded in the pipe wall. Only the 59.5 keV radiation energy of the source is utilized. Two of the detectors measure transmitted radiation across the pipe flow, and one measure scattered radiation at a 90 degree sign angle. The purpose of the multibeam measurement geometry is to acquire flow regime information and to reduce the flow regime dependency of the gas volume fraction (GVF) measurements. The measurement of scattered radiation enables the dual modality densitometry (DMD) measurement principle to be exploited. Its basic principle is to combine the measurement of scattered and transmitted radiation in order to obtain salinity independent GVF measurements. The salinity dependency is otherwise strongly significant when using low-energy radiation. It is also possible to measure the salinity by using this principle. The instrument is a laboratory prototype, and it has been used for characterising the measurement principle and to test different detector alternatives. The testing of the instrument includes static tests on plastic phantoms, tests on simulated water/gas flow and three phase flow loop tests. Both the multibeam measurement principle and the DMD principle have been verified to provide valuable information. This paper presents the physics behind, experimental results and an evaluation of the system

  16. On the impact bending test technique for high-strength pipe steels

    Science.gov (United States)

    Arsenkin, A. M.; Odesskii, P. D.; Shabalov, I. P.; Likhachev, M. V.

    2015-10-01

    It is shown that the impact toughness (KCV-40 = 250 J/cm2) accepted for pipe steels of strength class K65 (σy ≥ 550 MPa) intended for large-diameter gas line pipes is ineffective to classify steels in fracture strength. The results obtained upon testing of specimens with a fatigue crack and additional sharp lateral grooves seem to be more effective. In energy consumption, a macrorelief with splits is found to be intermediate between ductile fracture and crystalline brittle fracture. A split formation mechanism is considered and a scheme is proposed for split formation.

  17. Ratcheting failure of pressurised straight pipes and elbows under reversed bending

    International Nuclear Information System (INIS)

    Vishnuvardhan, S.; Raghava, G.; Gandhi, P.; Saravanan, M.; Goyal, Sumit; Arora, Punit; Gupta, Suneel K.; Bhasin, Vivek

    2013-01-01

    Ratcheting studies were carried out on Type 304LN stainless steel straight pipes and elbows subjected to steady internal pressure and cyclic bending load. The internal pressure for all the straight pipes was 35 MPa and in the case of elbows the internal pressure was varied for different elbows, ranging from 27.6 MPa to 39.2 MPa. Cyclic bending load was applied on the specimens by subjecting them to different levels of load-line displacement. The specimens have undergone significant ratchet swelling (ballooning), ovalization and consequent thinning of the cross-section during ratcheting. The straight pipes failed either by occurrence of through-wall crack accompanied by simultaneous ballooning, or bursting with simultaneous ballooning. All the elbows failed by occurrence of through-wall crack accompanied by simultaneous ballooning. Ratcheting behaviour of straight pipes and elbows were compared and it was generally inferred that ratcheting was more pronounced in straight pipes than in elbows. -- Graphical abstract: Strain history for the specimen QCE-RAT-6-L1. Highlights: • Studies were carried out under combined internal pressure and cyclic bending. • Ratcheting strains were measured at critical locations of the specimens. • Quantified the percentage of ballooning, ovalization and reduction in thickness. • Modes of ratcheting failure of straight pipes and elbows are studied. • Inferred that ratcheting is more pronounced in straight pipes than in elbows

  18. High frequency statistical energy analysis applied to fluid filled pipe systems

    NARCIS (Netherlands)

    Beek, P.J.G. van; Smeulers, J.P.M.

    2013-01-01

    In pipe systems, carrying gas with high velocities, broadband turbulent pulsations can be generated causing strong vibrations and fatigue failure, called Acoustic Fatigue. This occurs at valves with high pressure differences (i.e. chokes), relief valves and obstructions in the flow, such as sharp

  19. Finding buried metallic pipes using a non-destructive approach based on 3D time-domain induced polarization data

    Science.gov (United States)

    Shao, Zhenlu; Revil, André; Mao, Deqiang; Wang, Deming

    2018-04-01

    The location of buried utility pipes is often unknown. We use the time-domain induced polarization method to non-intrusively localize metallic pipes. A new approach, based on injecting a primary electrical current between a pair of electrodes and measuring the time-lapse voltage response on a set of potential electrodes after shutting down this primary current is used. The secondary voltage is measured on all the electrodes with respect to a single electrode used as a reference for the electrical potential, in a way similar to a self-potential time lapse survey. This secondary voltage is due to the formation of a secondary current density in the ground associated with the polarization of the metallic pipes. An algorithm is designed to localize the metallic object using the secondary voltage distribution by performing a tomography of the secondary source current density associated with the polarization of the pipes. This algorithm is first benchmarked on a synthetic case. Then, two laboratory sandbox experiments are performed with buried metallic pipes located in a sandbox filled with some clean sand. In Experiment #1, we use a horizontal copper pipe while in Experiment #2 we use an inclined stainless steel pipe. The result shows that the method is effective in localizing these two pipes. At the opposite, electrical resistivity tomography is not effective in localizing the pipes because they may appear resistive at low frequencies. This is due to the polarization of the metallic pipes which blocks the charge carriers at its external boundaries.

  20. Experiments in turbulent pipe flow

    Energy Technology Data Exchange (ETDEWEB)

    Torbergsen, Lars Even

    1998-12-31

    This thesis reports experimental results for the mean velocity and turbulence statistics in two straight pipe sections for bulk Reynolds numbers in the range 22000 to 75000. The flow was found consistent with a fully developed state. Detailed turbulence spectra were obtained for low and moderate turbulent Reynolds number. For the pipe centre line location at R{sub {lambda}} = 112, a narrow range in the streamwise power spectrum applied to the -5/3 inertial subrange. However this range was influenced both by turbulence production and viscous dissipation, and therefore did not reflect a true inertial range. The result indicates how the intermediate range between the production and dissipative scales can be misinterpreted as an inertial range for low and moderate R{sub {lambda}}. To examine the universal behaviour of the inertial range, the inertial scaling of the streamwise power spectrum is compared to the inertial scaling of the second order longitudinal velocity structure function, which relate directly by a Fourier transform. Increasing agreement between the Kolmogorov constant C{sub K} and the second order structure function scaling constant C{sub 2} was observed with increasing R{sub {lambda}}. The result indicates that a true inertial range requires several decades of separation between the energy containing and dissipative scales. A method for examining spectral anisotropy is reported and applied to turbulence spectra in fully developed pipe flow. It is found that the spectral redistribution from the streamwise to the two lateral spectra goes primarily to the circumferential component. Experimental results are reported for an axisymmetric contraction of a fully developed pipe flow. 67 refs., 75 figs., 9 tabs.

  1. Wet gas sampling

    Energy Technology Data Exchange (ETDEWEB)

    Welker, T.F.

    1997-07-01

    The quality of gas has changed drastically in the past few years. Most gas is wet with hydrocarbons, water, and heavier contaminants that tend to condense if not handled properly. If a gas stream is contaminated with condensables, the sampling of that stream must be done in a manner that will ensure all of the components in the stream are introduced into the sample container as the composite. The sampling and handling of wet gas is extremely difficult under ideal conditions. There are no ideal conditions in the real world. The problems related to offshore operations and other wet gas systems, as well as the transportation of the sample, are additional problems that must be overcome if the analysis is to mean anything to the producer and gatherer. The sampling of wet gas systems is decidedly more difficult than sampling conventional dry gas systems. Wet gas systems were generally going to result in the measurement of one heating value at the inlet of the pipe and a drastic reduction in the heating value of the gas at the outlet end of the system. This is caused by the fallout or accumulation of the heavier products that, at the inlet, may be in the vapor state in the pipeline; hence, the high gravity and high BTU. But, in fact, because of pressure and temperature variances, these liquids condense and form a liquid that is actually running down the pipe as a stream or is accumulated in drips to be blown from the system. (author)

  2. Sulfide flux formed by the anaerobic slime on the surface of the gravity sewer pipe wall. Shizen ryuka no gesuikan ni okeru kenki slime kara no ryukabutsu flux

    Energy Technology Data Exchange (ETDEWEB)

    Yoshimoto, K. (Japan Sewage Works Agency, Tokyo (Japan)); Mori, T. (Shimane Univ., Shimane (Japan). Faculty of Agriculture)

    1992-09-10

    A part of sulfide dissolved in the sewage is oxidized by oxygen dissolved in the sewage from the gas phase inside by the re-aeration. In addition, a part of type of the dissolvable sulfides is diffused in the gas phase as a hydrogen sulfide gas by the turbulence and so on in the sewage. When hydrogen sulfide diffused in the gas phase is oxidized to sulfuric acid by the sulfur oxidation bacteria, the corrosion and deterioration of concrete by that sulfuric acid are concerned even in the gravity sewer pipe as same as in the sewer pipe downstream from the discharge opening of the pressurized transport pipe for a long distance. When the gravity sewer pipe is planned and designed, it is required for establishing the necessary countermeasure at the places where the generation of sulfide is predicted, by estimating the sulfide concentration in the sewage accurately. In this report, making the slime adhered on the gravity sewer pipe wall and the slime grown in the laboratory as the objects, some knowledges on the sulfide flux from the anaerobic slime were obtained by measuring the sulfide flux and so forth. 16 refs., 4 figs., 3 tabs.

  3. Heat pipes and use of heat pipes in furnace exhaust

    Science.gov (United States)

    Polcyn, Adam D.

    2010-12-28

    An array of a plurality of heat pipe are mounted in spaced relationship to one another with the hot end of the heat pipes in a heated environment, e.g. the exhaust flue of a furnace, and the cold end outside the furnace. Heat conversion equipment is connected to the cold end of the heat pipes.

  4. Drill pipe bridge plug

    International Nuclear Information System (INIS)

    Winslow, D.W.; Brisco, D.P.

    1991-01-01

    This patent describes a method of stopping flow of fluid up through a pipe bore of a pipe string in a well. It comprises: lowering a bridge plug apparatus on a work string into the pipe string to a position where the pipe bore is to be closed; communicating the pipe bore below a packer of the bridge plug apparatus through the bridge plug apparatus with a low pressure zone above the packer to permit the fluid to flow up through the bridge plug apparatus; engaging the bridge plug apparatus with an internal upset of the pipe string; while the fluid is flowing up through the bridge plug apparatus, pulling upward on the work string and the bridge plug apparatus and thereby sealing the packer against the pipe bore; isolating the pipe bore below the packer from the low pressure zone above the packer and thereby stopping flow of the fluid up through the pipe bore; disconnecting the work string from the bridge plug apparatus; and maintaining the bridge plug apparatus in engagement with the internal upset and sealed against the pipe bore due to an upward pressure differential applied to the bridge plug apparatus by the fluid contained therebelow

  5. Insulated pipe clamp design

    International Nuclear Information System (INIS)

    Anderson, M.J.; Hyde, L.L.; Wagner, S.E.; Severud, L.K.

    1980-01-01

    Thin wall large diameter piping for breeder reactor plants can be subjected to significant thermal shocks during reactor scrams and other upset events. On the Fast Flux Test Facility, the addition of thick clamps directly on the piping was undesired because the differential metal temperatures between the pipe wall and the clamp could have significantly reduced the pipe thermal fatigue life cycle capabilities. Accordingly, an insulated pipe clamp design concept was developed. 5 refs

  6. Miniature Heat Pipes

    Science.gov (United States)

    1997-01-01

    Small Business Innovation Research contracts from Goddard Space Flight Center to Thermacore Inc. have fostered the company work on devices tagged "heat pipes" for space application. To control the extreme temperature ranges in space, heat pipes are important to spacecraft. The problem was to maintain an 8-watt central processing unit (CPU) at less than 90 C in a notebook computer using no power, with very little space available and without using forced convection. Thermacore's answer was in the design of a powder metal wick that transfers CPU heat from a tightly confined spot to an area near available air flow. The heat pipe technology permits a notebook computer to be operated in any position without loss of performance. Miniature heat pipe technology has successfully been applied, such as in Pentium Processor notebook computers. The company expects its heat pipes to accommodate desktop computers as well. Cellular phones, camcorders, and other hand-held electronics are forsible applications for heat pipes.

  7. Data Quality Objectives Report for the 115-B Gas Tunnel

    International Nuclear Information System (INIS)

    Bauer, R.G.

    1998-05-01

    This workbook assisted the Data Quality Objectives Team in implementing the Data Quality Objectives Process through the use of a template which lists the important elements of the DQO. The completion of this workbook is a required element of the BHI-EE-01, Procedure 1.2, 'Data Quality Objectives.' The objective of this project is to define the sampling and analysis requirements for isolation and decontamination and decommissioning release of the 115- B Gas Tunnel. The 115-B Gas Tunnel is an underground concrete pipe tunnel that houses piping used to recirculate helium gas between the 105-B Reactor Building and the 115-B/C Gas Recirculation System

  8. Design considerations for the protection from the effects of pipe rupture

    International Nuclear Information System (INIS)

    1975-11-01

    The methods which are employed by Ebasco Services, Inc. to satisfy the requirement of 10 CFR 50, Appendix A, General Design Criterion (GDC) 4 are discussed. This criterion provides the design basis for protection against the dynamic effects of postulated piping failures (ruptures and cracks) in Nuclear Power Plants. The criteria for postulating pipe failure locations, determining the dynamic effects associated with the postulated failure and designing the plant to satisfactorily withstand postulated pipe failures have been the subject of a great deal of recent work by the nuclear power industry and the Nuclear Regulatory Commission (NRC). This topical report is largely based upon that work as well as upon Ebasco's independent development of analytical tools to aid in the plant design process

  9. Effect of rotary inertia of concentrated masses on the natural vibration of fluid conveying pipes

    International Nuclear Information System (INIS)

    Kang, Myeong Gie

    1999-01-01

    Effects of the rotary inertia of concentrated masses on the natural vibrations of fluid conveying pipes have been studied by theoretical modeling and computer simulation. For analysis, two boundary conditions for pipe ends, simply supported and clamped-clamped, are assumed and Galerkin's method is used for transformation of the governing equation to the eigenvalues problem and the natural frequencies and mode shapes for the system have been calculated by using the newly developed computer code. Moreover, the critical velocities related to a system instability have been investigated. The main conclusions for the present study are (1) rotary inertia gives much change on the higher natural frequencies and mode shapes and its effect is visible when it has small value, (2) The number and location of nodes can be changed by rotary inertia, (3) By introducing rotary inertia, the second natural frequency approaches to the first as the location of the concentrated mass approaches to the midspan of the pipe, and (4) The critical fluid velocities to initiate the system unstable are unchanged by introduction of rotary inertia and the first three velocities are π, 2π, and 3π for the simply supported pipe and 2π, 8.99 and 12.57 for the clamped-clamped pipe. (author). 16 refs., 7 figs., 3 tabs

  10. Riser pipe elevator

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, W.; Jimenez, A.F.

    1987-09-08

    This patent describes a method for storing and retrieving a riser pipe, comprising the steps of: providing an upright annular magazine comprised of an inside annular wall and an outside annular wall, the magazine having an open top; storing the riser pipe in a substantially vertically oriented position within the annular magazine; and moving the riser pipe upwardly through the open top of the annular magazine at an angle to the vertical along at least a portion of the length of the riser pipe.

  11. Smart location system; Sistema de localizacao inteligente Smart Location System

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Jose Augusto Pereira da; Antunes, Rodrigo de Castro; Azevedo, Fabio Augusto Ferreira de [PipeWay Engenharia, Rio de Janeiro, RJ (Brazil); Afonso, Orlando de Jesus Ribeiro [Instituto de Pesquisas da Marinha, Rio de Janeiro, RJ (Brazil); Matsuura, Minoru; Santa Cruz, Sergio de Freitas [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil); Santos, Jose Alberto Costa dos; Hashiguchi, Decio Issao [GDK Engenharia (Brazil)

    2003-07-01

    This paper describes the technology used in the Intelligent Location System developed by Pipeway and includes some of the results already obtained optimizing repair time and logistic costs during the location of anomalies detected by intelligent pigs, a joint operation within the scope of the contract for Sub sea Pipeline Recovery in the Guanabara Bay with PETROBRAS/TRANSPETRO and GDK Engenharia. The system uses the ELF (Extra Low Frequency) transmission and reception technology at points near a pipe, with or without concrete coating, whose signals are recorded in the inspection tool memory to accurately establish reference points, thus preventing excessive dig work or dredging when human and operational risks tend to be high. (author)

  12. Numerical analysis of water hammer induced by injection of subcooled water into steam flow in a horizontal pipe

    International Nuclear Information System (INIS)

    Minato, Akihiko; Nagoyoshi, Takuji; Nakamura, Akira; Fujii, Yuzo; Aya, Izuo; Yamane, Kenji

    2004-01-01

    Subcooled water injection into steam flow in piping systems may generate a water column containing a large steam slug. The steam slug collapses due to rapid condensation and interfaces on both sides collides with each other. Water hammer takes place and sharp pressure pulse propagates through the pipe. The purpose of this study is to show capability of the present numerical simulation method for predictions of pressure transient and loads on a piping system following steam slug collapse. A three-dimensional computer code for transient gas-liquid two-phase flow was applied to simulate an experiment of steam-condensation-induced water hammer with a horizontal polycarbonate pipe. The code was based on the extended two-fluid model, which treated interface motion using the VOF (Volume of Fluid) technique. The Godunov scheme of highly compressible single-phase flow was modified for application to the Riemann problem solution of gas-liquid mixture. Analysis of local steam slug collapse resulted in comparable peak pressure and pulse width of pressure transients with the observation. The calculation of pressure pulse propagation and impact load on piping system showed the quasi-steady pressure load was imposed especially on elbow at 1/10 of water hammer peak pressure. (author)

  13. Corrosion and cathodic protection of buried pipes: study, simulation and application of solar energy

    International Nuclear Information System (INIS)

    Laoun, Brahim; Serir, Lazhar; Niboucha, Karima

    2006-01-01

    Cathodic protection is intensively used on steel pipes in petroleum and gas industries. It is a technique used to prevent corrosion which transforms the whole pipe into a cathode of a corrosion cell. Two types of cathodic protection systems are usually used: 1) the galvanic protection systems which use galvanic anodes, also called sacrificial anodes being electrochemically more electronegative than the structure to be protected and 2) the imposed current systems, which through a current generator will deliver a direct current from the anode to the structure to be protected. The aim of this work is to design a cathodic protection system of a pipe by imposed current with auxiliary electric solar energy. (O.M.)

  14. Leak in spiral weld in a 16 inches gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Fazzini, Pablo G; Bona, Jeremias de [GIE S.A., Mar del Plata (Argentina); Otegui, Jose L [University of Mar del Plata (Argentina)

    2009-07-01

    This paper discusses a failure analysis after a leak in the spiral weld of a 16 inches natural gas pipeline, in service since 1974. The leak was the result of the coalescence of two different defects, on each surface of the pipe wall, located in the center of the inner cord of the helical DSAW weld. Fractographic and metallographic studies revealed that the leak was a combination of three conditions. During fabrication of the pipe, segregation in grain boundary grouped in mid weld. During service, these segregations underwent a process of selective galvanic corrosion. One of these volumetric defects coincided with a tubular pore in the outer weld. Pigging of the pipeline in 2005 for cleaning likely contributed to the increase of the leak flow, when eliminating corrosion product plugs. Although these defects are likely to repeat, fracture mechanics shows that a defect of this type is unlikely to cause a blowout. (author)

  15. Calculation of piping loads due to filling procedures; Berechnung von Rohrleitungsbelastungen durch Fuellvorgaenge

    Energy Technology Data Exchange (ETDEWEB)

    Swidersky, Harald; Thiele, Thomas [TUeV Sued Industrie Service GmbH, Muenchen (Germany)

    2012-11-01

    Filling procedures in piping systems are usually not load cases that are studied by fluid dynamic and structure dynamic analyses with respect to the integrity of pipes and supports. Although, their frequency is higher than that of postulated accidental transients, therefore they have to be considered for fatigue analyses. The piping and support loads due to filling procedures are caused by the density differences if the transported fluids, for instance in flows with the transport of gas bubbles. The impact duration of the momentum forces is defined by the flow velocity and the length of discontinuities in the piping segments. Filling procedures end very often with a shock pressure, caused by the impact and decelerating of the fluid front at smaller cross sections. The suitability of the thermally hydraulics program RELAP/MOD3.3 for the calculation of realistic loads from filling procedures was studied, the results compared with experimental data. It is shown that dependent on the discretization level the loads are partial significantly underestimated.

  16. Development and testing of passive autocatalytic recombiners cooled by heat pipes

    International Nuclear Information System (INIS)

    Granzow, Christoph

    2012-01-01

    A severe accident in a nuclear power plant (NPP) can lead to core damage in conjunction with the release of large amounts of hydrogen. As hydrogen mitigation measure, passive autocatalytic recombiners (PARs) are used in today's pressurized water reactors. PARs recombine hydrogen and oxygen contained in the air to steam. The heat from this exothermic reaction causes the catalyst and its surroundings to heat up. If parts of the PAR heat up above the ignition temperature of the gas mixture, a spontaneous deflagration or detonation can occur. The aim of this work is the prevention of such high temperatures by means of passive cooling of the catalyst with heat pipes. Heat pipes are completely passive heat exchanger with a very high effective thermal conductivity. For a deeper understanding of the reaction kinetics at lower temperatures, single catalytic coated heat pipes are studied in a flow reactor. The development of a modular small-scale PAR model is then based on a test series with cooled catalyst sheets. Finally, the PAR model is tested inside a pressure vessel under boundary conditions similar to a real NPP. The experiments show, that the temperatures of the cooled catalytic sheets stay significantly below the temperature of the uncooled sheets and below the ignition temperature of the gas mixture under any set boundary conditions, although no significant reduction of the conversion efficiency can be observed. As a last point, a mathematical model of the reaction kinetics of the recombination process as well as a model of the fluid dynamic and thermohydraulic processes in a heat pipe are developed with the data obtained from the experiments.

  17. Natural gas fuelling stations installation code

    Energy Technology Data Exchange (ETDEWEB)

    Barrigar, C; Burford, G; Adragna, M; Hawryn, S

    2004-07-01

    This Canadian Standard applies to natural gas fuelling stations that can be used for fleet and public dispensing operations. This document is divided into 11 sections that address the scope of the Standard; definitions and reference publications; general requirements; compressors; storage; dispensing; flow control devices; storage vessel dispatch and receiving; design, installation and testing of piping, tubing and fittings; and installation of vehicle refuelling appliances (VRAs) connected to storage piping. The most recent revision to the Standard includes requirements for indoor fuelling of natural gas vehicles. This Standard, like all Canadian Standards, was subject to periodic review and was most recently reaffirmed in 2004. tabs., figs.

  18. SEALING LARGE-DIAMETER CAST-IRON PIPE JOINTS UNDER LIVE CONDITIONS

    Energy Technology Data Exchange (ETDEWEB)

    Kiran M. Kothari, Gerard T. Pittard

    2004-01-01

    Utilities in the U.S. operate over 75,000 km (47,000 miles) of old cast-iron pipes for gas distribution. The bell-and-spigot joints that connect pipe sections together tend to leak as these pipes age. Current repair practices are costly and highly disruptive. The objective of this program is to design, test and commercialize a robotic system capable of sealing multiple cast iron bell and spigot joints from a single pipe entry point. The proposed system will perform repairs while the pipe remains in service by traveling through the pipe, cleaning each joint surface, and installing a stainless-steel sleeve lined with an epoxy-impregnated felt across the joint. This approach will save considerable time and labor, avoid traffic disruption, and eliminate any requirement to interrupt service to customers (which would result in enormous expense to utilities). Technical challenges include: (1) repair sleeves must compensate for diametric variation and eccentricity of cast-iron pipes; (2) the assembly must travel long distances through pipes containing debris; (3) the pipe wall must be effectively cleaned in the immediate area of the joint to assure good bonding of the sleeve; and (4) an innovative bolt-on entry fitting is required to conduct repair operations on live mains. The development effort is divided into eleven tasks. Task 1--Program Management and Task 2--were completed in prior quarters while Task 3--Design and Fabricate Ratcheting Stainless-Steel Repair Sleeves has progressed to installing prototype sleeves in cast iron test pipe segments. Efforts in this quarter continued to focus on Tasks 4--8, with significant progress made in each. Task 4 (Design, Fabricate and Test Patch Setting Robotic Train) progressed to the design of the control electronics and pneumatic system to inflate the bladder robotic patch setting module. Task 5 (Design & Fabricate Pipe-Wall Cleaning Robot Train with Pan/Zoom/Tilt Camera) continued with additional in-pipe testing required to

  19. SEALING LARGE-DIAMETER CAST-IRON PIPE JOINTS UNDER LIVE CONDITIONS

    Energy Technology Data Exchange (ETDEWEB)

    Kiran M Kothari; Gerard T. Pittard

    2004-07-01

    Utilities in the U.S. operate over 75,000 km (47,000 miles) of old cast-iron pipes for gas distribution. The bell-and-spigot joints that connect pipe sections together tend to leak as these pipes age. Current repair practices are costly and highly disruptive. The objective of this program is to design, test and commercialize a robotic system capable of sealing multiple castiron bell and spigot joints from a single pipe entry point. The proposed system will perform repairs while the pipe remains in service by traveling through the pipe, cleaning each joint surface, and installing a stainless-steel sleeve lined with an epoxy-impregnated felt across the joint. This approach will save considerable time and labor, avoid traffic disruption, and eliminate any requirement to interrupt service to customers (which would result in enormous expense to utilities). Technical challenges include: (1) repair sleeves must compensate for diametric variation and eccentricity of cast-iron pipes; (2) the assembly must travel long distances through pipes containing debris; (3) the pipe wall must be effectively cleaned in the immediate area of the joint to assure good bonding of the sleeve; and (4) an innovative bolt-on entry fitting is required to conduct repair operations on live mains. The development effort is divided into eleven tasks. Task 1 (Program Management) and Task 2 (Establishment of Detailed Design Specifications) were completed in prior quarters while Task 3 (Design and Fabricate Ratcheting Stainless-Steel Repair Sleeves) has progressed to installing prototype sleeves in cast iron test pipe segments. Efforts in this quarter continued to focus on Tasks 4-8, with significant progress made in each. Task 4 (Design, Fabricate and Test Patch Setting Robotic Train) progressed to the design of the control electronics and pneumatic system to inflate the bladder robotic patch setting module. Task 5 (Design & Fabricate Pipe-Wall Cleaning Robot Train with Pan/Zoom/Tilt Camera

  20. SEALING LARGE-DIAMETER CAST-IRON PIPE JOINTS UNDER LIVE CONDITIONS

    Energy Technology Data Exchange (ETDEWEB)

    Kiran M. Kothari; Gerard T. Pittard

    2004-04-01

    Utilities in the U.S. operate over 75,000 km (47,000 miles) of old cast-iron pipes for gas distribution. The bell-and-spigot joints that connect pipe sections together tend to leak as these pipes age. Current repair practices are costly and highly disruptive. The objective of this program is to design, test and commercialize a robotic system capable of sealing multiple cast-iron bell and spigot joints from a single pipe entry point. The proposed system will perform repairs while the pipe remains in service by traveling through the pipe, cleaning each joint surface, and installing a stainless-steel sleeve lined with an epoxy-impregnated felt across the joint. This approach will save considerable time and labor, avoid traffic disruption, and eliminate any requirement to interrupt service to customers (which would result in enormous expense to utilities). Technical challenges include: (1) repair sleeves must compensate for diametric variation and eccentricity of cast-iron pipes; (2) the assembly must travel long distances through pipes containing debris; (3) the pipe wall must be effectively cleaned in the immediate area of the joint to assure good bonding of the sleeve; and (4) an innovative bolt-on entry fitting is required to conduct repair operations on live mains. The development effort is divided into eleven tasks. Task 1--Program Management and Task 2--were completed in prior quarters while Task 3--Design and Fabricate Ratcheting Stainless-Steel Repair Sleeves has progressed to installing prototype sleeves in cast iron test pipe segments. Efforts in this quarter continued to focus on Tasks 4--8, with significant progress made in each. Task 4 (Design, Fabricate and Test Patch Setting Robotic Train) progressed to the design of the control electronics and pneumatic system to inflate the bladder robotic patch setting module. Task 5 (Design & Fabricate Pipe-Wall Cleaning Robot Train with Pan/Zoom/Tilt Camera) continued with additional in-pipe testing required to

  1. Structural solution to the problem of differential settlement of the Venta de Carpio surface piping; Solucion estructural al problema de hundimientos diferenciales en las tuberias superficiales de Venta de Carpio

    Energy Technology Data Exchange (ETDEWEB)

    Vilar R, J Ivan; Espejel V, Eduardo; Melchor G, Nicolas; Alanis V, Armandina; Munoz B, Celso J; Avendano P, Lorenzo; Alvarado G, Alonso [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2004-07-01

    The Venta de Carpio Terminal (TVC) is located in the municipality of Acolman, State of Mexico, with geographical coordinates 19 37' of Northern latitude, 98 58' Western longitude and an altitude of 2,283 m over the mean sea level. This terminal is one of the points of greater importance in the system of fuels transport and gas distribution so much as of PEMEX Gas y Petroquimica Basica (PGPB) as of PEMEX Refinacion (PR). The zone where the TVC is located presents a regional collapse due to the extraction of the subsoil water, which can cause damages to this terminal piping systems. As a solution to this problem it is proposed a process of re-lay the foundations of the supports for the mentioned piping systems. [Spanish] La Terminal Venta de Carpio (TVC) se localiza en el municipio de Acolman, Estado de Mexico, con coordenadas geograficas 19 37' de latitud Norte, 98 58' longitud Oeste y una altura de 2,283 m sobre el nivel medio del mar. Esta terminal es uno de los puntos de mayor importancia en el sistema de transporte y distribucion de energeticos tanto de Pemex Gas y Petroquimica Basica (PGPB) como de Pemex Refinacion (PR). La zona donde se ubica la TVC presenta un hundimiento regional debido a la extraccion del agua del subsuelo, lo que puede ocasionar danos a las tuberias de esta terminal. Como solucion a este problema se propone un proceso de recimentacion de los soportes para las tuberias mencionadas.

  2. Structural solution to the problem of differential settlement of the Venta de Carpio surface piping; Solucion estructural al problema de hundimientos diferenciales en las tuberias superficiales de Venta de Carpio

    Energy Technology Data Exchange (ETDEWEB)

    Vilar R, J. Ivan; Espejel V, Eduardo; Melchor G, Nicolas; Alanis V, Armandina; Munoz B, Celso J; Avendano P, Lorenzo; Alvarado G, Alonso [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2004-07-01

    The Venta de Carpio Terminal (TVC) is located in the municipality of Acolman, State of Mexico, with geographical coordinates 19 37' of Northern latitude, 98 58' Western longitude and an altitude of 2,283 m over the mean sea level. This terminal is one of the points of greater importance in the system of fuels transport and gas distribution so much as of PEMEX Gas y Petroquimica Basica (PGPB) as of PEMEX Refinacion (PR). The zone where the TVC is located presents a regional collapse due to the extraction of the subsoil water, which can cause damages to this terminal piping systems. As a solution to this problem it is proposed a process of re-lay the foundations of the supports for the mentioned piping systems. [Spanish] La Terminal Venta de Carpio (TVC) se localiza en el municipio de Acolman, Estado de Mexico, con coordenadas geograficas 19 37' de latitud Norte, 98 58' longitud Oeste y una altura de 2,283 m sobre el nivel medio del mar. Esta terminal es uno de los puntos de mayor importancia en el sistema de transporte y distribucion de energeticos tanto de Pemex Gas y Petroquimica Basica (PGPB) como de Pemex Refinacion (PR). La zona donde se ubica la TVC presenta un hundimiento regional debido a la extraccion del agua del subsuelo, lo que puede ocasionar danos a las tuberias de esta terminal. Como solucion a este problema se propone un proceso de recimentacion de los soportes para las tuberias mencionadas.

  3. 46 CFR 58.10-15 - Gas turbine installations.

    Science.gov (United States)

    2010-10-01

    ... applicable, shall be furnished. (c) Exhausts. (1) Where piping is used for gas turbine exhaust lines, Class II is required as a minimum. (See subpart 56.04 of this subchapter.) Where the exhaust pressure... other than pipe is employed, the drawings and design data shall be submitted to substantiate suitability...

  4. Development of LBB Piping Evaluation Diagram for APR 1000 Main Steam Line Piping

    International Nuclear Information System (INIS)

    Yang, J. S.; Jeong, I. L.; Park, C. Y.; Bai, S. Y.

    2010-01-01

    This paper presents the piping evaluation diagram (PED) to assess the applicability of Leak-Before- Break(LBB) for APR 1000 main steam line piping. LBB-PED of APR 1000 main steam line piping is independent of its piping geometry and has a function of the loads applied in piping system. Also, in order to evaluate LBB applicability during construction process with only the comparative evaluation of material properties between actually used and expected, the expected changes of material properties are considered in the LBB-PED. The LBB-PED, therefore, can be used for quick LBB evaluation of APR 1000 main steam line piping of both design and construction

  5. PIPE STRESS and VERPIP codes for stress analysis and verifications of PEC reactor piping

    International Nuclear Information System (INIS)

    Cesari, F.; Ferranti, P.; Gasparrini, M.; Labanti, L.

    1975-01-01

    To design LMFBR piping systems following ASME Sct. III requirements unusual flexibility computer codes are to be adopted to consider piping and its guard-tube. For this purpose PIPE STRESS code previously prepared by Southern-Service, has been modified. Some subroutine for detailed stress analysis and principal stress calculations on all the sections of piping have been written and fitted in the code. Plotter can also be used. VERPIP code for automatic verifications of piping as class 1 Sct. III prescriptions has been also prepared. The results of PIPE STRESS and VERPIP codes application to PEC piping are in section III of this report

  6. A natural adsorbent for natural gas industry; Um adsorvente nacional para a industria do gas natural

    Energy Technology Data Exchange (ETDEWEB)

    Cachina, G.H.A.B.; Silveira, V.R.; Melo, D.M.A. [Universidade Federal do Rio Grande do Norte (UFRN), Natal, RN (Brazil); Balthar, A.R.; Oliveira, V.M.; Bayer, M.M. [CTGAS - Centro de Tecnologias do Gas, Natal, RN (Brazil); Barbosa, C.M.M. [Universidade Federal de Pernambuco (UFPE), Recife, PE (Brazil)

    2004-07-01

    One the natural pollutants in the natural gas considered critical in reference to the corrosion is the H{sub 2}S. Its presence depends on the origin, as well as the own process used in the gas treatment, it can bring problems to the pipes and the final applications of natural gas (NG). The National Petroleum Agency (ANP) in its entrance number 104/02, establishes that the quantity of H{sub 2}S in NG, of national or imported origin, commercialized at the country can only be at the most 10 - 15 mg/m{sup 3}. In the Natural Gas Processing Unit (UPGN) different methods are used for the removal of H{sub 2}S, the absorption process (e.g. with aminas, Sulfinol{sup R} process) or for adsorption in tower filled with activated coal, zeolites and Sulfatreat{sup R}. In this work, the adsorbent material used is the mineral clay Paligorsquita. That class of clay minerals characterized by pores and a crystalline structure containing Tetrahedral layers linked by chains of longitudinal secondary lines. The typical unitary cell is formed basically by moisturized oxides of aluminum, Sicilian and magnesium of (Mg, Al)5SiO2O(OH)2(H20)4.4H20, with Mg specially located in octahedral sites. (author)

  7. Piping research program plan

    International Nuclear Information System (INIS)

    1988-09-01

    This document presents the piping research program plan for the Structural and Seismic Engineering Branch and the Materials Engineering Branch of the Division of Engineering, Office of Nuclear Regulatory Research. The plan describes the research to be performed in the areas of piping design criteria, environmentally assisted cracking, pipe fracture, and leak detection and leak rate estimation. The piping research program addresses the regulatory issues regarding piping design and piping integrity facing the NRC today and in the foreseeable future. The plan discusses the regulatory issues and needs for the research, the objectives, key aspects, and schedule for each research project, or group of projects focussing of a specific topic, and, finally, the integration of the research areas into the regulatory process is described. The plan presents a snap-shot of the piping research program as it exists today. However, the program plan will change as the regulatory issues and needs change. Consequently, this document will be revised on a bi-annual basis to reflect the changes in the piping research program. (author)

  8. Analytical studies of blowdown thrust force and dynamic response of pipe at pipe rupture accident

    International Nuclear Information System (INIS)

    Miyazaki, Noriyuki

    1985-01-01

    The motion of a pipe due to blowdown thrust when the pipe broke is called pipe whip. In LWR power plants, by installing restraints, the motion of a pipe when it broke is suppressed, so that the damage does not spread to neighboring equipment by pipe whip. When the pipe whip of a piping system in a LWR power plant is analyzed, blowdown thrust and the dynamic response of a pipe-restraint system are calculated with a computer. The blowdown thrust can be calculated by using such physical quantities as the pressure, flow velocity, density and so on in the system at the time of blowdown, obtained by the thermal-fluid analysis code at LOCA. The dynamic response of a piping-restraint system can be determined by the stress analysis code using finite element method taking the blowdown thrust as an external force acting on the piping. In this study, the validity of the analysis techniques was verified by comparing with the experimental results of the measurement of blowdown thrust and the pipe whip of a piping-restraint system, carried out in the Japan Atomic Energy Research Institute. Also the simplified analysis method to give the maximum strain on a pipe surface is presented. (Kako, I.)

  9. 40 CFR 86.1309-90 - Exhaust gas sampling system; Otto-cycle and non-petroleum-fueled engines.

    Science.gov (United States)

    2010-07-01

    ... exhaust duct excludes the length of pipe representative of the vehicle exhaust pipe) shall be minimized... exhaust manifold, immediately after exhaust aftertreatment systems, or after a length of pipe representative of the vehicle exhaust pipe; or (iv) Partial dilution of the exhaust gas prior to entering the...

  10. Ductile fracture of circumferentially cracked type-304 stainless steel pipes in tension

    Energy Technology Data Exchange (ETDEWEB)

    Zahoor, A.; Norris, D.M.

    1984-11-01

    Circumferentially cracked pipes subjected to tensile load were analyzed for finite length and constant depth part-through cracks located at the inside of the pipe wall. The analysis postulated loads sufficient to cause net-section yielding of the flawed section. It was demonstrated that a propensity for predominantly radial growth exists for part-through cracks loaded in tension. This result is similar to the result for bend loading, except that bend loading causes more favorable conditions for wall breakthrough than tension loading. Numerical results were developed for 4-in. and 24-in-dia pipes. Safety margins for displacement controlled loads were described by a safety assessment diagram. This diagram defines a curve delineating leak from fracture in a space of nondimensional crack length and crack depth. 4-india schedule 80 Type-304 stainless steel pipes with length to radius ratio (L/R) of up to 100 exhibited leak-before-break behavior.

  11. Ductile fracture of circumferentially cracked type-304 stainless steel pipes in tension

    International Nuclear Information System (INIS)

    Zahoor, A.; Norris, D.M.

    1984-01-01

    Circumferentially cracked pipes subjected to tensile load were analyzed for finite length and constant depth part-through cracks located at the inside of the pipe wall. The analysis postulated loads sufficient to cause net-section yielding of the flawed section. It was demonstrated that a propensity for predominantly radial growth exists for part-through cracks loaded in tension. This result is similar to the result for bend loading, except that bend loading causes more favorable conditions for wall breakthrough than tension loading. Numerical results were developed for 4-in. and 24-in-dia pipes. Safety margins for displacement controlled loads were described by a safety assessment diagram. This diagram defines a curve delineating leak from fracture in a space of nondimensional crack length and crack depth. 4-india schedule 80 Type-304 stainless steel pipes with length to radius ratio (L/R) of up to 100 exhibited leak-before-break behavior

  12. Piping Stress analysis for primary system of nuclear power plant AP-600

    International Nuclear Information System (INIS)

    Tjahjono, Hendro; Arhatari, B.D.; W, Pustandyo; Sitandung, J.B; Sudarmaji, Djoko

    1999-01-01

    Piping stress analysis for AP-600 primary system has been done using software CAEPIPE and PS-CAEPIPE. The loading applied to the system are static and seismic category I and II piping in reactor building have been analysed, those are PXS-900, CVS-110, PCS-030, CAS-700 and CCS-050. These system contain pipes with the normal diameter of 1 , 2 , 4 a nd 8 . The design pressures are in the range of 150oF to 300oF. The acceleration taken as input in PS-CAEPIPE is based on seismic response spectra of floor the piping is located. In CAEPIPE, the acceleration taken from the peak of response spectra multiplied by 1.7 all of the acceleration in this case are no more than 0.36g. The result shows that after locating some supports, all system are acceptable without snubbers. The maximum stress are 11210 psi for deadweight load and 35593 psi for total load (the allowable values are 15000 psi and 45000 psi). The maximum displacement are 0.123 in for deadweight load, 1.474 in for hot load seismic load (the allowable values are 0.125 in for deadweight and 2.5 in for total load). The difference results of the both software is mainly in seismic calculation where mare parameters can be evaluated by PS-CAEPIPE including to evaluate valves acceleration in seismic condition

  13. Development of the clamp-on ultrasound flow meter for steam in pipe

    International Nuclear Information System (INIS)

    Kawaguchi, Tatsuya; Tsukada, Keisuke; Kikura, Hiroshige; Tanaka, Katsuhiko; Umezawa, Shuichi

    2014-01-01

    Gas flow metering of a pipe flow such as chemical plant, reactors and power stations is one of the significant techniques that enable to diagnose and control the behavior of working fluid, and to govern the entire fluid system in the industrial facilities. In order to operate the aforementioned systems, the precise measurement of the flow rate is required. The conventional flow meter, however, needs the installation of the spool piece that disturbs the stable and continuous operation of the plants. i.e., the destructive set-up process of the measurement section is necessary. In this study, the novel ultrasound gas flow metering technique has been developed by means of the clamp-on ultrasound transmitter and receivers. By the numerical simulation, the ultrasound propagation through the gas and metal pipe was firstly investigated. The effects of the external damping material, applicable vapor pressure range as well as the appropriate shape of the acoustic lens were analyzed that was followed by the feasibility test of the actual measurement system. The pressurized vapor flow was used as a working fluid. Pressure and sensor dimension were varied to compare the efficiency of the ultrasound transmission between transducers. The temperature of the working fluid was beyond 373 K. The ultrasound pulsar-receiver was used that could control the frequency, amplitude and phase of the burst sinusoids. The signal processing algorithm was developed in order to discriminate the direct signal through the gaseous flow from the unwanted circumference noise through the solid stainless pipe. The linear relation between flow rate and ultrasound peak shift was confirmed. (author)

  14. Elastic-plastic dynamic behavior of guard pipes due to sudden opening of longitudinal cracks in the inner pipe and crash to the guard pipe wall

    International Nuclear Information System (INIS)

    Theuer, E.; Heller, M.

    1979-01-01

    Integrity of guard pipes is an important parameter in the design of nuclear steam supply systems. A guard pipe shall withstand all kinds of postulated inner pipe breaks without failure. Sudden opening of a crack in the inner pipe and crash of crack borders to the guard pipe wall represent a shock problem where complex phenomena of dynamic plastification as well as dynamic behavior of the entire system have to be taken in consideration. The problem was analyzed by means of Finite Element computation using the general purpose program MARC. Equation of motion was resolved by direct integration using the Newmark β-operator. Analysis shows that after 1,2 m sec crack borders touch the guard pipe wall for the first time. At this moment a considerable amount of local plastification appears in the inner pipe wall, while the guard pipe is nearly unstressed. After initial touching, the crack borders begin to slip along the guard pipe wall. Subsequently, a short withdrawal of the crack borders and a new crash occur, while the inner pipe rolls along the guard pipe wall. The analysis procedure described is suitable for designing numerous guard pipe geometries as well as U-Bolt restraint systems which have to withstand high-energy pipe rupture impact. (orig.)

  15. Effect of surface wettability on flow patterns in vertical gas-liquid two-phase flow

    International Nuclear Information System (INIS)

    Nakamura, D.

    2005-01-01

    To examine the effect of the surface characteristics on the flow regime in two-phase flow, visualization study was performed using three test pipes, namely a no-coating pipe, a water-attracting coating pipe, a water-shedding coating pipe. Three flow regime maps were obtained based on the visual observation in the three pipes. In the water-attracting coating pipe, the slug flow-to-churn flow transition boundary was shifted to higher gas velocity at a given liquid velocity, whereas the churn flow-to-annular flow transition boundary was shifted to lower gas velocity at a given liquid velocity. In the water shedding coating pipe, the inverted-churn flow regime was observed in the region where the churn flow regime was to be observed in a no-coating pipe, whereas the droplet flow regime was observed in the region where the annular flow regime was to be observed in a no-coating pipe. The criteria for the slug flow-to-inverted-churn flow transition and the inverted-churn flow-to-droplet flow transition were modeled by force balance approaches. The modeled transition criteria could predict the observed flow transition boundaries reasonably well. (authors)

  16. Normal appendix in adults: MDCT findings about the location, thickness and the presence or absence of intraluminal gas

    International Nuclear Information System (INIS)

    Oh, Kyoung Jin; Cho, June Sik; Shin, Kyung Sook; Kim, Ha Young; Lim, Sae Kyung; Ohm, Joon Young; Yoon, Chung Dae; Shin, Byung Seok

    2006-01-01

    We wanted to examine the usefulness of multi-detector CT (MDCT) with multiplanar reformations for evaluating the location, thickness and the presence or absence of intraluminal gas in the normal appendix of adults. From December 2004 to June 2005, we evaluated normal appendices in 427 consecutive adult patients who were scanned with 16-slice MDCT. All these patients had no clinical findings of appendicitis. There were 251 men and 176 women. The age range was 19-84 years (mean age: 55 years). The contrast-enhanced MDCT scans during the portal phase were obtained with 0.75 mm detector collimation and they were reviewed with using the multiplanar reconstruction images (3 mm section thickness). The MDCT images of normal appendices on a PACS monitor were retrospectively analyzed. We analyzed the location, thickness and the presence or absence of intraluminal gas by consensus of two abdominal radiologists. The positions of normal appendices were classified as type I (postileal and medial paracecal), type II (subcecal), type III (retrocecal and retrocolic or laterocolic), type IV (preileal and medical colic) and type V (lower pelvic cavity). The five types of appendiceal locations were as follows: type I (n = 187; 44%), type II (n 78; 18%), type III (n = 92, 22%), type IV (n = 39; 9%) and type V (n = 31; 7%). The appendiceal tips in 29 cases (7%) were unusually located in the right subhepatic space, the small bowel mesentery and the right adnexa. The mean thickness of 427 appendices was 5.8 ± 0.9 mm (range: 3.8-9.2 mm). The appendiceal mean thickness was 5.9 ± 0.9 mm in men and 5.7 ± 0.9 mm in women (ρ < 0.05). 384 (90%) of 427 appendices had intraluminal gas and 43 (10%) had no intraluminal gas, and their mean thickness was 5.9 mm (range: 3.8-9.2 mm) and 5.3 mm (3.8-7.3 mm), respectively (ρ < 0.05). MDCT with multiplanar reformations was useful for evaluating the location, thickness and the presence or absence of intraluminal gas in normal appendix of adults. These

  17. Numerical simulation and geometry optimization of hot-gas mixing in lower plenum of high temperature gas-cooled reactor

    International Nuclear Information System (INIS)

    Wang Hang; Wang Jie; Laurien, E.

    2010-01-01

    The lower plenum in high temperature gas-cooled reactor was designed to mix the gas of different temperatures from the reactor core. Previous researches suggest the current geometry of the lower plenum to be improved for better mixing capability and lower pressure drop. In the presented work, a series of varied geometries were investigated with numerical simulation way. The choice of appropriate mesh type and size used in the geometry variation was discussed with the reference of experimental data. The original thin ribs in the current design were merged into thicker ones, and a junction located at the starting end of the outlet pipe was introduced. After comparing several potential optimization methods, an improved geometry was selected with the merged ribs increasing the pre-defined mixing coefficient and the junction reducing the pressure drop. Future work was discussed based on the simulation of real reactor case. The work shows a direction for design improvements of the lower plenum geometry. (authors)

  18. Solar heating pipe

    Energy Technology Data Exchange (ETDEWEB)

    Hinson-Rider, G.

    1977-10-04

    A fluid carrying pipe is described having an integral transparent portion formed into a longitudinally extending cylindrical lens that focuses solar heat rays to a focal axis within the volume of the pipe. The pipe on the side opposite the lens has a heat ray absorbent coating for absorbing heat from light rays that pass through the focal axis.

  19. Altitude Performance Characteristics of Tail-pipe Burner with Variable-area Exhaust Nozzle

    Science.gov (United States)

    Jansen, Emmert T; Thorman, H Carl

    1950-01-01

    An investigation was conducted in the NACA Lewis altitude wind tunnel to determine effect of altitude and flight Mach number on performance of tail-pipe burner equipped with variable-area exhaust nozzle and installed on full-scale turbojet engine. At a given flight Mach number, with constant exhaust-gas and turbine-outlet temperatures, increasing altitude lowered the tail-pipe combustion efficiency and raised the specific fuel consumption while the augmented thrust ratio remained approximately constant. At a given altitude, increasing flight Mach number raised the combustion efficiency and augmented thrust ratio and lowered the specific fuel consumption.

  20. Defect detection of wall thinning defect in pipes using lock-in photo-infrared thermography technique

    Energy Technology Data Exchange (ETDEWEB)

    Jang, Su Ok; Park, Jong Hyun; Choi, Tae Ho; Jung, Hyun Chul; Kim, Kyoung Suk [Chosun Univ., Gwangju (Korea, Republic of)

    2008-07-01

    Piping in the Nuclear Power plants (NPP) are mostly consisted of carbon steel pipe. The wall thinning defect is mainly occurred by the affect of the Flow Accelerated Corrosion (FAC) of fluid which flows in carbon steel pipes. This type of defect becomes the cause of damage or destruction of piping. Therefore, it is very important to measure defect which is existed not only on the welding partbut also on the whole field of pipe. Over the years, Infrared Thermography (IRT) has been used as a non destructive testing methods of the various kinds of materials. This technique has many merits and applied to the industrial field but has limitation to the materials. Therefore, this method was combined with lock-in technique. So IRT detection resolution has been progressively improved using lock-in technique. In this paper, the quantitative analysis results of the location and the size of wall thinning defect that is artificially processed inside the carbon steel pipe by using IRT are obtained.

  1. Reliability of piping system components. Volume 4: The pipe failure event database

    Energy Technology Data Exchange (ETDEWEB)

    Nyman, R; Erixon, S [Swedish Nuclear Power Inspectorate, Stockholm (Sweden); Tomic, B [ENCONET Consulting GmbH, Vienna (Austria); Lydell, B [RSA Technologies, Visat, CA (United States)

    1996-07-01

    Available public and proprietary databases on piping system failures were searched for relevant information. Using a relational database to identify groupings of piping failure modes and failure mechanisms, together with insights from published PSAs, the project team determined why, how and where piping systems fail. This report represents a compendium of technical issues important to the analysis of pipe failure events, and statistical estimation of failure rates. Inadequacies of traditional PSA methodology are addressed, with directions for PSA methodology enhancements. A `data driven and systems oriented` analysis approach is proposed to enable assignment of unique identities to risk-significant piping system component failure. Sufficient operating experience does exist to generate quality data on piping failures. Passive component failures should be addressed by today`s PSAs to allow for aging analysis and effective, on-line risk management. 42 refs, 25 figs.

  2. Reliability of piping system components. Volume 4: The pipe failure event database

    International Nuclear Information System (INIS)

    Nyman, R.; Erixon, S.; Tomic, B.; Lydell, B.

    1996-07-01

    Available public and proprietary databases on piping system failures were searched for relevant information. Using a relational database to identify groupings of piping failure modes and failure mechanisms, together with insights from published PSAs, the project team determined why, how and where piping systems fail. This report represents a compendium of technical issues important to the analysis of pipe failure events, and statistical estimation of failure rates. Inadequacies of traditional PSA methodology are addressed, with directions for PSA methodology enhancements. A 'data driven and systems oriented' analysis approach is proposed to enable assignment of unique identities to risk-significant piping system component failure. Sufficient operating experience does exist to generate quality data on piping failures. Passive component failures should be addressed by today's PSAs to allow for aging analysis and effective, on-line risk management. 42 refs, 25 figs

  3. A Study on Techniques for Focusing Circumferential Array Guided Waves for Long Range Inspection of Pipes

    International Nuclear Information System (INIS)

    Kang, To; Kim, Hak Joon; Song, Sung Jin; Cho, Young Do; Lee, Dong Hoon; Cho, Hyun Joon

    2009-01-01

    Ultrasonic guided waves have been widely utilized for long range inspection of structures. Especially, development of array guided waves techniques and its application for long range gas pipe lines(length of from hundreds meters to few km) were getting increased. In this study, focusing algorithm for array guided waves was developed in order to improve long range inspectability and accuracy of the array guided waves techniques for long range inspection of gas pipes, and performance of the developed techniques was verified by experiments using the developed array guided wave system. As a result, S/N ratio of array guided wave signals obtained with the focusing algorithm was increased higher than that of signals without focusing algorithm

  4. Monitoring and localization of buried plastic natural gas pipes using passive RF tags

    Science.gov (United States)

    Mondal, Saikat; Kumar, Deepak; Ghazali, Mohd. Ifwat; Chahal, Prem; Udpa, Lalita; Deng, Yiming

    2018-04-01

    A passive harmonic radio frequency (RF) tag on the pipe with added sensing capabilities is proposed in this paper. Radio frequency identification (RFID) based tagging has already emerged as a potential solution for chemical sensing, location detection, animal tagging, etc. Harmonic transponders are already quite popular compared to conventional RFIDs due to their improved signal to noise ratio (SNR). However, the operating frequency, transmitted power and tag efficiency become critical issues for underground RFIDs. In this paper, a comprehensive on-tag sensing, power budget and frequency analyses is performed for buried harmonic tag design. Accurate tracking of infrastructure burial depth is proposed to reduce the probability of failure of underground pipelines. Burial depth is estimated using phase information of received signals at different frequencies calculated using genetic algorithm (GA) based optimization for post processing. Suitable frequency range is determined for a variety of soil with different moisture content for small tag-antenna size. Different types of harmonic tags such as 1) Schottky diode, 2) Non-linear Transmission Line (NLTL) were compared for underground applications. In this study, the power, frequency and tag design have been optimized to achieve small antenna size, minimum signal loss and simple reader circuit for underground detection at up to 5 feet depth in different soil medium and moisture contents.

  5. Large-bore pipe decontamination

    International Nuclear Information System (INIS)

    Ebadian, M.A.

    1998-01-01

    The decontamination and decommissioning (D and D) of 1200 buildings within the US Department of Energy-Office of Environmental Management (DOE-EM) Complex will require the disposition of miles of pipe. The disposition of large-bore pipe, in particular, presents difficulties in the area of decontamination and characterization. The pipe is potentially contaminated internally as well as externally. This situation requires a system capable of decontaminating and characterizing both the inside and outside of the pipe. Current decontamination and characterization systems are not designed for application to this geometry, making the direct disposal of piping systems necessary in many cases. The pipe often creates voids in the disposal cell, which requires the pipe to be cut in half or filled with a grout material. These methods are labor intensive and costly to perform on large volumes of pipe. Direct disposal does not take advantage of recycling, which could provide monetary dividends. To facilitate the decontamination and characterization of large-bore piping and thereby reduce the volume of piping required for disposal, a detailed analysis will be conducted to document the pipe remediation problem set; determine potential technologies to solve this remediation problem set; design and laboratory test potential decontamination and characterization technologies; fabricate a prototype system; provide a cost-benefit analysis of the proposed system; and transfer the technology to industry. This report summarizes the activities performed during fiscal year 1997 and describes the planned activities for fiscal year 1998. Accomplishments for FY97 include the development of the applicable and relevant and appropriate regulations, the screening of decontamination and characterization technologies, and the selection and initial design of the decontamination system

  6. Development of piping evaluation diagram for LBB application to KNGR surge line

    International Nuclear Information System (INIS)

    Yoon, K. S.; Park, W. B.; Kim, J. M.; Choi, T. S.; Yang, J. S.; Park, C. Y.

    1998-01-01

    Plant specific data, such as pipe geometry, material properties and pipe loads, are required in order to evaluate Leak-Before-Break (LBB) applicability to piping systems in nuclear power plant under the construction. However, the existing method of LBB evaluation for KSNP's can not be used for newly developed nuclear plants such as Korean Next Generation Reactor (KNGR) which material properties is not available and LBB evaluation is required during design process. In order to solve this problem during developing process for KNGR surge line LBB Piping Evaluation Diagram (PED), which is independent of piping geometry and has a function of the loads applied in piping system, is developed in this paper. Also, in order to evaluate LBB applicability during construction process with only the comparative evaluation of material properties between actually used and expected, the expected changes of material properties are considered in the PED. The PED, therefore, can be used for quick LBB evaluation of KNGR surge line in the process of both design and construction. The benefit obtained by using the PED is : 1) to be able to very quickly confirm LBB applicability without calculating any leakage crack length for all concerned piping locations in the process of both iterative design for optimal routing and construction and 2) to save significantly a lot of computing times required for the corresponding LBB analyses

  7. 46 CFR 34.20-15 - Piping-T/ALL.

    Science.gov (United States)

    2010-10-01

    ... GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS FIREFIGHTING EQUIPMENT Deck Foam System, Details... paragraph, all piping is assumed to be damaged in way of the fire and an adequate number of valves shall be... housefront or aft of the cargo area in a location that is accessible to the crew for fighting a cargo and a...

  8. Microbiological community in biogas systems and evaluation of microbial risks from gas usage

    Energy Technology Data Exchange (ETDEWEB)

    Vinneraas, B.; Nordin, A. [Swedish Univ. of Agricultural Sciences, Dept. of Biometry and Engineering, Uppsala (Sweden); Schoenning, C. [Swedish Inst. for Infectious Disease Control, Dept. of Parasitology, Mycology, Environmental Mirobiology and Water, Solna (Sweden)

    2007-12-15

    The plans for introducing biogas produced from organic waste to the pipe system for natural gas have raised concerns about the risk of transmitting disease via the gas. To assess this risk, condensate water from gas pipes and gas from different parts of biogas upgrading systems were sampled and cultured for microbial content. The number of microorganisms found in the biogas correspond to the densities in sampled natural gas. Since no pathogens were identified and since the exposure to gas from e. g. cookers and refueling of cars may only result in the inhalation of small volumes of gas, the risk of spreading disease via biogas was judged to be very low. (orig.)

  9. Development of Pipe Holding Mechanism for Pipe Inspection Robot Using Flexible Pneumatic Cylinder

    Directory of Open Access Journals (Sweden)

    Choi Kyujun

    2016-01-01

    Full Text Available A pipe inspection robot is useful to reduce the inspection cost. In the previous study, a novel pipe inspection robot using a flexible pneumatic cylinder that can move forward along to the pipe by changing the robot’s body naturally was proposed and tested. In this paper, to improve its mobility for a corner of a pipe, the thin pipe holding mechanism using pneumatic bellows was proposed and tested. As a result of its driving test, the holding performance of the mechanism was confirmed.

  10. Piping reliability model development, validation and its applications to light water reactor piping

    International Nuclear Information System (INIS)

    Woo, H.H.

    1983-01-01

    A brief description is provided of a three-year effort undertaken by the Lawrence Livermore National Laboratory for the piping reliability project. The ultimate goal of this project is to provide guidance for nuclear piping design so that high-reliability piping systems can be built. Based on the results studied so far, it is concluded that the reliability approach can undoubtedly help in understanding not only how to assess and improve the safety of the piping systems but also how to design more reliable piping systems

  11. Control and metallurgical examination on safety injection piping

    International Nuclear Information System (INIS)

    Thebault, Y.; Grandjean, Y.; Gauthier, V.; Lambert, B.; Debustcher, B.

    1998-01-01

    From 1992 until 1997, cracking phenomena by thermal fatigue regarding safety injection piping were evidenced on several PWR 900 MW reactors. These events led EDF to the implementation of a first maintenance programme. In December 1996, a new leak occurred on an EDF 900 MW PWR in operation and was located on a safety injection pipe. In site inspections and metallurgical examinations carried out in the EDF hot Laboratory evidenced defects inside the pipe, out of the welding areas. These degradations are the consequence of a fatigue cracking phenomenon with thermal cycling linked to permanent tensile stresses. Following this incident, a programme of non destructive testing was implemented on all the EDF 900 MW plants. These inspections exhibited the same defects on other PWR 900 MW units. The results of the metallurgical examinations and also in site inspection results allowed EDF to understand the phenomenon and to validate an inspection programme on the one hand and a modification of the design of the circuits on the other hand. (authors)

  12. Emergency management in the gas and water supply; Notfallmanagement in der Gas- und Wasserversorgung

    Energy Technology Data Exchange (ETDEWEB)

    Boy, Stephan [KKI GmbH, Kompetenzzentrum Kritische Infrastrukturen GmbH, Berlin (Germany)

    2013-06-15

    Gas and water pipes belong to the critical infrastructure in Germany. Their protection requires a holistic risk analysis, which also keep an eye on the dependence of the power supply. [German] Gas- und Wasserleitungen gehoeren zu den kritischen Infrastrukturen in Deutschland. Ihr Schutz erfordert eine ganzheitliche Risikoanalyse, die auch die Abhaengigkeit von der Stromversorgung im Blick hat.

  13. Effect of bend separation distance on the mass transfer in back-to-back pipe bends arranged in a 180° configuration

    Science.gov (United States)

    Chen, X.; Le, T.; Ewing, D.; Ching, C. Y.

    2016-12-01

    The mass transfer to turbulent flow through back-to-back pipe bends arranged in a 180° configuration with different lengths of pipe between the bends was measured using a dissolving gypsum test section in water. The measurements were performed for bends with a radius of curvature of 1.5 times the pipe diameter ( D) at a Reynolds numbers of 70,000 and Schmidt number of 1280. The maximum mass transfer in the bends decreased from approximately 1.8 times the mass transfer in the upstream pipe when there was no separation distance between the bends to 1.7 times when there was a 1 D or 5 D length of pipe between the bends. The location of the maximum mass transfer was on the inner sidewall downstream of the second bend when there was no separation distance between the bends. This location changed to the inner wall at the beginning of the second bend when there was a 1 D long pipe between the bends, and to the inner sidewall at the end of the first bend when there was a 5 D long pipe between the bends.

  14. Alpha contamination assessment for D ampersand D activities: Monitoring pipe interiors

    International Nuclear Information System (INIS)

    Rawool-Sullivan, M.W.; Conaway, J.G.; MacArthur, D.W.; Vaccarella, J.

    1996-02-01

    We have developed a prototype instrument capable of assessing alpha-emitting contamination on interior surfaces of ducts, pipes, tanks, and other enclosed volumes without inserting a probe. Air is drawn through the potentially contaminated volume and then through a detection grid, where ions created in the air by alpha particles are collected and the resulting charge measured with a sensitive electrometer. A filter at the intake end of the contaminated volume excludes externally created ions, so only ions generated inside the volume are detected. We have studied the response of this prototype in initial experiments using calibrated alpha sources with various pipe diameters and configurations, air flows, and source locations in the pipes. The results of these experiments indicate that this method can be an effective approach to assessing internal contamination

  15. A risk-informed approach to optimising in-service inspection of piping

    International Nuclear Information System (INIS)

    Billington, A.; Monette, P.

    1999-01-01

    Traditional criteria for the selection of in-service inspection locations in piping, have come to be regarded as being out-of-touch with current knowledge of piping failures and with current measures of safety importance. An alternative , risk-informed, method has been developed and successfully licensed, that systematically establishes an inspection plan addressing all safety-related piping systems, in a way that is optimized with respect to the safety gain achieved through in-service inspection. The principles of the method are discussed and the results of several applications are summarized, all of which demonstrate that the risk-informed program would lead to significant improvements in the overall level of plant safety, while at the same time re-distributing the inspections in such a way that reduces both plant costs and radiation exposure to personnel.(author)

  16. Studies on as separation behaviour of polymer blending PI/PES hybrid mixed membrane: Effect of polymer concentration and zeolite loading

    Directory of Open Access Journals (Sweden)

    Ahmad Fauzi Ismail

    2014-04-01

    Full Text Available This study is performed primarily to investigate the effect of polymer concentration of polyimide/polyethersulfone (PI/PES blending on the gas separation performance of hybrid mixed matrix membrane. In this study, PI/ (PES–zeolite 4A mixed matrix membranes were casted using dry/wet phase inversion technique. The efefct of PI/PES concentrations and zeolite loading on the dope solution were investigated for gas separation performance. The results from the Field Emission Scanning Electron Microscopy (FESEM analysis confirmed that polymer concentration and zeolite loading was affected the morphology of membrane and gas separation performance. ‘Sieve-in-a-cage’ morphology observed the poor adhesion between polymer and zeolite at higher zeolite loading. The gas separation performance of the mixed matrix membranes were relatively higher compared to that of the neat polymeric membrane.

  17. Optimization of investments in gas networks

    International Nuclear Information System (INIS)

    Andre, J.

    2010-09-01

    The natural gas networks require very important investments to cope with a still growing demand and to satisfy the new regulatory constraints. The gas market deregulation imposed to the gas network operators, first, transparency rules of a natural monopoly to justify their costs and ultimately their tariffs, and, second, market fluidity objectives in order to facilitate access for competition to the end-users. These major investments are the main reasons for the use of optimization techniques aiming at reducing the costs. Due to the discrete choices (investment location, limited choice of additional capacities, timing) crossed with physical non linear constraints (flow/pressures relations in the pipe or operating ranges of compressors), the programs to solve are Large Mixed Non Linear Programs (MINLP). As these types of programs are known to be hard to solve exactly in polynomial times (NP-hard), advanced optimization methods have to be implemented to obtain realistic results. The objectives of this thesis are threefold. First, one states several investment problems modeling of natural gas networks from industrial world motivations. Second, one identifies the most suitable methods and algorithms to the formulated problems. Third, one exposes the main advantages and drawbacks of these methods with the help of numerical applications on real cases. (author)

  18. Training and certification of the personnel of gas distribution pipe-laying contractor companies in Spain; Formation et certification du personnel des contracteurs pour la pose des gazoducs en Espagne

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    Since the end of the 1980's, the Spanish gas sector has been experiencing a strong rate of growth of consumption, extension of transportation and distribution networks, and numbers of customers, especially in the domestic and commercial market. Polyethylene is playing a primordial rote in the growing extension of distribution networks in Spain, being the material by far the most widely used both in terms of extension of the network and replacement of obsolete materials. For Spanish gas distribution companies, carrying out this extension of the transportation and distribution network is a primordial objective in order to reach and lay gas supplies on to new towns, with the highest levels of quality and safety. This payer describes the personnel certification work on the gas distribution pipe-laying contractor companies carried out by Sedigas within the framework of the requirements of the standard ISO 45013, on certification of personnel. (author)

  19. Thermoelectric Power Generation System for Future Hybrid Vehicles Using Hot Exhaust Gas

    Science.gov (United States)

    Kim, Sun-Kook; Won, Byeong-Cheol; Rhi, Seok-Ho; Kim, Shi-Ho; Yoo, Jeong-Ho; Jang, Ju-Chan

    2011-05-01

    The present experimental and computational study investigates a new exhaust gas waste heat recovery system for hybrid vehicles, using a thermoelectric module (TEM) and heat pipes to produce electric power. It proposes a new thermoelectric generation (TEG) system, working with heat pipes to produce electricity from a limited hot surface area. The current TEG system is directly connected to the exhaust pipe, and the amount of electricity generated by the TEMs is directly proportional to their heated area. Current exhaust pipes fail to offer a sufficiently large hot surface area for the high-efficiency waste heat recovery required. To overcome this, a new TEG system has been designed to have an enlarged hot surface area by the addition of ten heat pipes, which act as highly efficient heat transfer devices and can transmit the heat to many TEMs. As designed, this new waste heat recovery system produces a maximum 350 W when the hot exhaust gas heats the evaporator surface of the heat pipe to 170°C; this promises great possibilities for application of this technology in future energy-efficient hybrid vehicles.

  20. Japan does it mainly compact and flexible: Innovate improvements in the natural gas distribution technique and gas appliances

    International Nuclear Information System (INIS)

    Roebers, H.

    1994-01-01

    Specific Japanese innovative improvements in natural gas distribution systems and natural gas appliances are outlined, based on the KAI-ZEN philosophy. Attention is paid to the design of flexible gas pipes, gas plug-in sockets, and safety systems, and the compact design of gas appliances. Much of the innovations focus on details. Briefly, the NEXT 21 project is described, which project anticipates the silent wishes of the Japanese people with regard to lifestyle