  1. 49 CFR 193.2181 - Impoundment capacity: LNG storage tanks.

    Science.gov (United States)

    2010-10-01

    ... LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Design Impoundment Design and Capacity § 193.2181 Impoundment capacity: LNG storage tanks. Each impounding system serving an LNG storage tank must have a... 49 Transportation 3 2010-10-01 2010-10-01 false Impoundment capacity: LNG storage tanks. 193.2181...

  2. 49 CFR 193.2623 - Inspecting LNG storage tanks.

    Science.gov (United States)

    2010-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Maintenance § 193.2623 Inspecting LNG storage tanks. Each LNG... 49 Transportation 3 2010-10-01 2010-10-01 false Inspecting LNG storage tanks. 193.2623 Section 193...

  3. Study on Calculation of Liquid Level And Storage of Tanks for LNG-fueled Vessels

    Science.gov (United States)

    Li, Kun; Wang, Guoqing; Liu, Chang

    2018-01-01

    As the ongoing development of the application of LNG as a clean energy in waterborne transport industry, the fleet scale of LNG-fueled vessels enlarged and the safety operation has attracted more attention in the industry. Especially the accurate detection of liquid level of LNG tanks is regarded as an important issue to ensure a safe and stable operation of LNG-fueled ships and a key parameter to keep the proper functioning of marine fuel storage system, supply system and safety control system. At present, detection of LNG tank liquid level mainly adopts differential pressure detection method. Liquid level condition could be found from the liquid level reference tables. However in practice, since LNG-fueled vessels are generally not in a stationary state, liquid state within the LNG tanks will constantly change, the detection of storage of tanks only by reference to the tables will cause deviation to some extent. By analyzing the temperature under different pressure, the effects of temperature change on density and volume integration calculation, a method of calculating the liquid level and storage of LNG tanks is put forward making the calculation of liquid level and actual storage of LNG tanks more accurately and providing a more reliable basis for the calculation of energy consumption level and operation economy for LNG-fueled vessels.

  4. Monitoring and analysis of liquid storage in LNG tank based on different support springs

    Science.gov (United States)

    He, Hua; Sun, Jianping; Li, Ke; Wu, Zheng; Chen, Qidong; Chen, Guodong; Cao, Can

    2018-04-01

    With the rapid development of social modernization, LNG vehicles are springing up in daily life. However, it is difficult to monitor and judge the liquid storage tanks accurately and quickly. Based on this, this paper presents a new method of liquid storage monitoring, LNG tank on-line vibration monitoring system. By collecting the vibration frequency of LNG tank and tank liquid and supporting spring system, the liquid storage quality in the tank can be calculated. In this experiment, various vibration modes of the tank spring system are fully taken into account. The vibration effects of different types of support springs on the LNG tank system were investigated. The results show that the spring model has a great influence on the test results. This study provides a technical reference for the selection of suitable support springs for liquid storage monitoring.

  5. Failure analysis of storage tank component in LNG regasification unit using fault tree analysis method (FTA)

    Science.gov (United States)

    Mulyana, Cukup; Muhammad, Fajar; Saad, Aswad H.; Mariah, Riveli, Nowo

    2017-03-01

    Storage tank component is the most critical component in LNG regasification terminal. It has the risk of failure and accident which impacts to human health and environment. Risk assessment is conducted to detect and reduce the risk of failure in storage tank. The aim of this research is determining and calculating the probability of failure in regasification unit of LNG. In this case, the failure is caused by Boiling Liquid Expanding Vapor Explosion (BLEVE) and jet fire in LNG storage tank component. The failure probability can be determined by using Fault Tree Analysis (FTA). Besides that, the impact of heat radiation which is generated is calculated. Fault tree for BLEVE and jet fire on storage tank component has been determined and obtained with the value of failure probability for BLEVE of 5.63 × 10-19 and for jet fire of 9.57 × 10-3. The value of failure probability for jet fire is high enough and need to be reduced by customizing PID scheme of regasification LNG unit in pipeline number 1312 and unit 1. The value of failure probability after customization has been obtained of 4.22 × 10-6.

  6. Seismic analysis of a LNG storage tank isolated by a multiple friction pendulum system

    Science.gov (United States)

    Zhang, Ruifu; Weng, Dagen; Ren, Xiaosong

    2011-06-01

    The seismic response of an isolated vertical, cylindrical, extra-large liquefied natural gas (LNG) tank by a multiple friction pendulum system (MFPS) is analyzed. Most of the extra-large LNG tanks have a fundamental frequency which involves a range of resonance of most earthquake ground motions. It is an effective way to decrease the response of an isolation system used for extra-large LNG storage tanks under a strong earthquake. However, it is difficult to implement in practice with common isolation bearings due to issues such as low temperature, soft site and other severe environment factors. The extra-large LNG tank isolated by a MFPS is presented in this study to address these problems. A MFPS is appropriate for large displacements induced by earthquakes with long predominant periods. A simplified finite element model by Malhotra and Dunkerley is used to determine the usefulness of the isolation system. Data reported and statistically sorted include pile shear, wave height, impulsive acceleration, convective acceleration and outer tank acceleration. The results show that the isolation system has excellent adaptability for different liquid levels and is very effective in controlling the seismic response of extra-large LNG tanks.

  7. Developments in the safe design of LNG tanks

    Science.gov (United States)

    Fulford, N. J.; Slatter, M. D.

    The objective of this paper is to discuss how the gradual development of design concepts for liquefied natural gas (LNG) storage systems has helped to enhance storage safety and economy. The experience in the UK is compared with practice in other countries with similar LNG storage requirements. Emphasis is placed on the excellent record of safety and reliability exhibited by tanks with a primary metal container designed and constructed to approved standards. The work carried out to promote the development of new materials, fire protection, and monitoring systems for use in LNG storage is also summarized, and specific examples described from British Gas experience. Finally, the trends in storage tank design world-wide and options for future design concepts are discussed, bearing in mind planned legislation and design codes governing hazardous installations.

  8. Analysis of temperature and pressure changes in liquefied natural gas (LNG) cryogenic tanks

    Science.gov (United States)

    Chen, Q.-S.; Wegrzyn, J.; Prasad, V.

    2004-10-01

    Liquefied natural gas (LNG) is being developed as a transportation fuel for heavy vehicles such as trucks and transit buses, to lessen the dependency on oil and to reduce greenhouse gas emissions. The LNG stations are properly designed to prevent the venting of natural gas (NG) from LNG tanks, which can cause evaporative greenhouse gas emissions and result in fluctuations of fuel flow and changes of fuel composition. Boil-off is caused by the heat added into the LNG fuel during the storage and fueling. Heat can leak into the LNG fuel through the shell of tank during the storage and through hoses and dispensers during the fueling. Gas from tanks onboard vehicles, when returned to LNG tanks, can add additional heat into the LNG fuel. A thermodynamic and heat transfer model has been developed to analyze different mechanisms of heat leak into the LNG fuel. The evolving of properties and compositions of LNG fuel inside LNG tanks is simulated. The effect of a number of buses fueled each day on the possible total fuel loss rate has been analyzed. It is found that by increasing the number of buses, fueled each day, the total fuel loss rate can be reduced significantly. It is proposed that an electric generator be used to consume the boil-off gas or a liquefier be used to re-liquefy the boil-off gas to reduce the tank pressure and eliminate fuel losses. These approaches can prevent boil-off of natural gas emissions, and reduce the costs of LNG as transportation fuel.

  9. A basic study on underground storage of LNG

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Min-Kyu; Lee, Kyung-Han; Kang, Sun-Duck [Korea Institute of Geology Mining and Materials, Taejon (KR)] (and others)

    1999-12-01

    In 1997, import of LNG was 11,378 thousand of about 2.3 billion US dollars. The demand of LNG(Liquefied Natural Gas) in Korea has been increased since 1987 with the rate of 20% annually. It is also estimated that this trend will be continued until 2010. Long-term estimation says that demand will increase with 9.1% and total demand of 2010 will be 23 million ton that is four times larger than that of 1994. Bases of unloading and store of LNG is necessary to complete the network of LNG distribution system to cover all of the country from import to final supply terminal at home. The construction plan of LNG bases with 49 tanks was published and is going on now at three bases, Pyungtaek, Incheon and Tongyoung. The total cost for this construction will be over 5,400 billion Won. All the LNG tanks are planned to build on the surface. The construction of LNG tanks on the surfaces is conventional but it damage the surface green area and is very vulnerable on safety, especially in Korea Peninsula with potentially unstable of military confrontation. And Korea is so small and limited in available land that it is not easy to find proper places for construction of more LNG tanks on surface. Underground LNG stores in rock will be a good alternative for tanks on surface in the view points of environmental and safety. It is also reported that it can be cheaper than that of on surfaces. It is well known that bed rocks in Korea is good to build underground structure like LNG stores. This report is basic research to seek for the possibility of LNG store construction in underground rocks. The important two questions on it is that whether it is possible technically and economically or not. The technical focus in this report is the stability of underground cavern for storage of LNG, energy conservation in operation, tightness against leakage of stored gas to surface and safety. Some statistic on LNG in Korea is given for this study with its future. (author). 25 refs., 36 tabs., 88 figs.

  10. Optimal LNG (liquefied natural gas) regasification scheduling for import terminals with storage

    International Nuclear Information System (INIS)

    Trotter, Ian M.; Gomes, Marília Fernandes Maciel; Braga, Marcelo José; Brochmann, Bjørn; Lie, Ole Nikolai

    2016-01-01

    We describe a stochastic dynamic programming model for maximising the revenue generated by regasification of LNG (liquefied natural gas) from storage tanks at importation terminals in relation to a natural gas spot market. We present three numerical resolution strategies: a posterior optimal strategy, a rolling intrinsic strategy and a full option strategy based on a least-squares Monte Carlo algorithm. We then compare model simulation results to the observed behaviour of three LNG importation terminals in the UK for the period April 2011 to April 2012, and find that there was low correlation between the observed regasification decisions of the operators and those suggested by the three simulated strategies. However, the actions suggested by the model simulations would have generated significantly higher revenues, suggesting that the facilities might have been operated sub-optimally. A further numerical experiment shows that increasing the storage and regasification capacities of a facility can significantly increase the achievable revenue, even without altering the amount of LNG received, by allowing operators more flexibility to defer regasification. - Highlights: • We present a revenue maximisation model for LNG (liquefied natural gas) storage tanks at import terminals. • Three resolution strategies: posterior optimal, rolling intrinsic and full option. • The full option strategy is based on a least-squares Monte Carlo algorithm. • Model simulations show potential for higher revenue in three UK LNG terminals. • Numerical experiments show how storage and regasification capacities affect revenue.

  11. LIQUIFIED NATURAL GAS (LNG) CARRIERS

    OpenAIRE

    Daniel Posavec; Katarina Simon; Matija Malnar

    2010-01-01

    Modern liquefied natural gas carriers are double-bottom ships classified according to the type of LNG tank. The tanks are specially designed to store natural gas cooled to -161°C, the boiling point of methane. Since LNG is highly flammable, special care must be taken when designing and operating the ship. The development of LNG carriers has begun in the middle of the twentieth century. LNG carrier storage space has gradually grown to the current maximum of 260000 m3. There are more than 300 L...

  12. LIQUIFIED NATURAL GAS (LNG CARRIERS

    Directory of Open Access Journals (Sweden)

    Daniel Posavec

    2010-12-01

    Full Text Available Modern liquefied natural gas carriers are double-bottom ships classified according to the type of LNG tank. The tanks are specially designed to store natural gas cooled to -161°C, the boiling point of methane. Since LNG is highly flammable, special care must be taken when designing and operating the ship. The development of LNG carriers has begun in the middle of the twentieth century. LNG carrier storage space has gradually grown to the current maximum of 260000 m3. There are more than 300 LNG carriers currently in operation (the paper is published in Croatian.

  13. Risk-based determination of design pressure of LNG fuel storage tanks based on dynamic process simulation combined with Monte Carlo method

    International Nuclear Information System (INIS)

    Noh, Yeelyong; Chang, Kwangpil; Seo, Yutaek; Chang, Daejun

    2014-01-01

    This study proposes a new methodology that combines dynamic process simulation (DPS) and Monte Carlo simulation (MCS) to determine the design pressure of fuel storage tanks on LNG-fueled ships. Because the pressure of such tanks varies with time, DPS is employed to predict the pressure profile. Though equipment failure and subsequent repair affect transient pressure development, it is difficult to implement these features directly in the process simulation due to the randomness of the failure. To predict the pressure behavior realistically, MCS is combined with DPS. In MCS, discrete events are generated to create a lifetime scenario for a system. The combination of MCS with long-term DPS reveals the frequency of the exceedance pressure. The exceedance curve of the pressure provides risk-based information for determining the design pressure based on risk acceptance criteria, which may vary with different points of view. - Highlights: • The realistic operation scenario of the LNG FGS system is estimated by MCS. • In repeated MCS trials, the availability of the FGS system is evaluated. • The realistic pressure profile is obtained by the proposed methodology. • The exceedance curve provides risk-based information for determining design pressure

  14. The sustainability of LNG evaporation

    NARCIS (Netherlands)

    Stougie, L.; Van der Kooi, H.J.

    2011-01-01

    Numerous LNG (Liquefied Natural Gas) import terminals are under construction to fulfil the growing demand for energy carriers. After storage in tanks, the LNG needs to be heated and evaporated, also called ‘regasified’, to the natural gas needed in households and industry. Several options exist for

  15. A NOVEL PROCESS TO USE SALT CAVERNS TO RECEIVE SHIP BORNE LNG

    Energy Technology Data Exchange (ETDEWEB)

    Michael M. McCall; William M. Bishop; Marcus Krekel; James F. Davis; D. Braxton Scherz

    2005-05-31

    This cooperative research project validates use of man made salt caverns to receive and store the cargoes of LNG ships in lieu of large liquid LNG tanks. Salt caverns will not tolerate direct injection of LNG because it is a cryogenic liquid, too cold for contact with salt. This research confirmed the technical processes and the economic benefits of pressuring the LNG up to dense phase, warming it to salt compatible temperatures and then directly injecting the dense phase gas into salt caverns for storage. The use of salt caverns to store natural gas sourced from LNG imports, particularly when located offshore, provides a highly secure, large scale and lower cost import facility as an alternative to tank based LNG import terminals. This design can unload a ship in the same time as unloading at a tank based terminal. The Strategic Petroleum Reserve uses man made salt caverns to securely store large quantities of crude oil. Similarly, this project describes a novel application of salt cavern gas storage technologies used for the first time in conjunction with LNG receiving. The energy industry uses man made salt caverns to store an array of gases and liquids but has never used man made salt caverns directly in the importation of LNG. This project has adapted and expanded the field of salt cavern storage technology and combined it with novel equipment and processes to accommodate LNG importation. The salt cavern based LNG receiving terminal described in the project can be located onshore or offshore, but the focus of the design and cost estimates has been on an offshore location, away from congested channels and ports. The salt cavern based terminal can provide large volumes of gas storage, high deliverability from storage, and is simplified in operation compared to tank based LNG terminals. Phase I of this project included mathematical modeling that proved a salt cavern based receiving terminal could be built at lower capital cost, and would have significantly higher

  16. 77 FR 43589 - Freeport LNG Development, L.P., Freeport LNG Expansion, L.P., FLNG Liquefaction LLC; Supplemental...

    Science.gov (United States)

    2012-07-25

    ... addition, a second ship berthing area, third LNG storage tank, and additional LNG vaporization and natural... 7.3 7.3 Appurtenant Facilities beyond Terminal Site and Pretreatment 0.1 0.1 0.2 Facility site and... issues that we think deserve attention based on a preliminary review of the planned facilities and the...

  17. Liquefied natural gas (LNG) : production, storage and handling. 7. ed.

    Energy Technology Data Exchange (ETDEWEB)

    Kalra, S; Jaron, K; Adragna, M; Coyle, S; Foley, C; Hawryn, S; Martin, A; McConnell, J [eds.

    2003-07-01

    This Canadian Standard on the production, storage and handling of liquefied natural gas (LNG) was prepared by the Technical Committee on Liquefied Natural Gas under the jurisdiction of the Steering Committee on Oil and Gas Industry Systems and Materials. It establishes the necessary requirements for the design, installation and safe operation of LNG facilities. The Standard applies to the design, location, construction, operation and maintenance of facilities at any location of the liquefaction of natural gas and for the storage, vaporization, transfer, handling and truck transport of LNG. The training of personnel involved is also included as well as containers for LNG storage, including insulated vacuum systems. It includes non-mandatory guidelines for small LNG facilities but does not apply to the transportation of refrigerants, LNG by rail, marine vessel or pipeline. This latest edition contains changes in working of seismic design requirements and minor editorial changes to several clauses to bring the Standard closer to the US National Fire Protection Association's Committee on Liquefied Natural Gas Standard while maintaining Canadian regulatory requirements. The document is divided into 12 sections including: general requirements; plant site provisions; process equipment; stationary LNG storage containers; vaporization facilities; piping system and components; instrumentation and electrical services; transfer of LNG and refrigerants; fire protection, safety and security; and, operating, maintenance and personnel training. This Standard, like all Canadian Standards, was subject to periodic review and was most recently reaffirmed in 2003. 6 tabs., 6 figs., 3 apps.

  18. The dependencies for determining the cargo capacity of lng carriers with spherical tanks and membrane tanks at the initial stages of design

    OpenAIRE

    Xinshuo, Dong

    2016-01-01

    The boiling point of liquefied natural gas (LNG) reaches –163 °c, it means that it is necessary to use the special cargo tanks for the LNG carriers to ensure the safety of transport. In this article, the general classification of the cargo system in the LNG carriers at the first time of their operation is demonstrated. And the author summarizes the process of development of the two most common type of cargo tanks: the spherical Moss types and the membrane types. Moreover, the cargo capacity a...

  19. Underground Storage Tanks - Storage Tank Locations

    Data.gov (United States)

    NSGIC Education | GIS Inventory — A Storage Tank Location is a DEP primary facility type, and its sole sub-facility is the storage tank itself. Storage tanks are aboveground or underground, and are...

  20. Thermodynamic aspects of an LNG tank in fire and experimental validation

    Science.gov (United States)

    Hulsbosch-Dam, Corina; Atli-Veltin, Bilim; Kamperveen, Jerry; Velthuis, Han; Reinders, Johan; Spruijt, Mark; Vredeveldt, Lex

    Mechanical behaviour of a Liquefied Natural Gas (LNG) tank and the thermodynamic behaviour of its containment under extreme heat load - for instance when subjected to external fire source as might occur during an accident - are extremely important when addressing safety concerns. In a scenario where external fire is present and consequent release of LNG from pressure relief valves (PRV) has occurred, escalation of the fire might occur causing difficulty for the fire response teams to approach the tank or to secure the perimeter. If the duration of the tank exposure to fire is known, the PRV opening time can be estimated based on the thermodynamic calculations. In this paper, such an accidental scenario is considered, relevant thermodynamic equations are derived and presented. Moreover, an experiment is performed with liquid nitrogen and the results are compared to the analytical ones. The analytical results match very well with the experimental observations. The resulting analytical models are suitable to be applied to other cryogenic liquids.

  1. Thermodynamic aspects of an LNG tank in fire and experimental validation

    Directory of Open Access Journals (Sweden)

    Hulsbosch-Dam Corina

    2017-01-01

    Full Text Available Mechanical behaviour of a Liquefied Natural Gas (LNG tank and the thermodynamic behaviour of its containment under extreme heat load – for instance when subjected to external fire source as might occur during an accident - are extremely important when addressing safety concerns. In a scenario where external fire is present and consequent release of LNG from pressure relief valves (PRV has occurred, escalation of the fire might occur causing difficulty for the fire response teams to approach the tank or to secure the perimeter. If the duration of the tank exposure to fire is known, the PRV opening time can be estimated based on the thermodynamic calculations. In this paper, such an accidental scenario is considered, relevant thermodynamic equations are derived and presented. Moreover, an experiment is performed with liquid nitrogen and the results are compared to the analytical ones. The analytical results match very well with the experimental observations. The resulting analytical models are suitable to be applied to other cryogenic liquids.

  2. Liquefied natural gas storage at Ambergate

    Energy Technology Data Exchange (ETDEWEB)

    Higton, C W; Mills, M J

    1970-08-19

    Ambergate works was planned in 1965-1966 and the decision was taken to install 4 ICI lean gas reformers using natural gas as feedstock, fuel, and enrichment. To cover the possible failure of natural gas supplies, petroleum distillate would be used as alternative feedstock and fuel. The choice for alternative enrichment lay between LPG or LNG. Since LNG would provide peak-on-peak storage facilities for either the East Midlands Board or the Gas Council when conversion was completed--and in the meantime would provide an additional source of LNG for local requirements when temporary LNG installations were used during conversion--agreement was reached with the Gas Council for it to build a 5,000-ton storage installation at Ambergate. The installation consists of 3 major sections: (1) the offloading bay and storage tank; (2) the reliquefaction system; and (3) the export system. The offloading bay and storage tank are for the reception and storage of liquefied Algerian natural gas, delivered to Ambergate by road tanker from the Canvey Is. Terminal. The reliquefaction system is to maintain the necessary storage tank conditions by reliquefying the boil-off natural gas. The export system delivers LNG from the storage tank at high pressure through a vaporization section in the national methane grid.

  3. Potential local use of natural gas or LNG from Hammerfest LNG plant

    International Nuclear Information System (INIS)

    Neeraas, Bengt Olav

    1999-01-01

    A base-load LNG plant is planned to be built in Norway, near by the northern most city in the world, Hammerfest. Natural gas from the Snoehvit-field will be transported by pipeline to Melkoeya, a few kilometres from Hammerfest, where the liquefaction plant is planned to be located. SINTEF Energy Research has performed a study in co-operation with the local authorities on potentials for the use of LNG and natural gas locally in the Hammerfest region. Combined power and heat production by lean-burn gas engine, low temperature freezing of high quality products by use of LNG cold and drying of fish products are some of the identified fields for the use of natural gas and LNG. The establishment of an industrial area, with fish processing industry and a central freezing storage near by Hammerfest has been suggested. The gas may be transported locally either as LNG, by tank lorry or container, or as gas in a small pipeline, depending on distance, amount and the actual use. (author)

  4. Static tilt tests of a full-sized cylindrical liquid storage tank model

    International Nuclear Information System (INIS)

    Sakai, F.

    1988-01-01

    This paper is explaining a static tilt test with a full-scaled tank model, the objects of which are the above-ground type LNG,LPG and oil storage tanks. Main points of view to investigate are as follows: Stress and deformation at each part of the tank wall, the bottom plate and the anchor straps in case that the anchor straps are very effective; Behavior in case that the anchor straps are not very effective; Behavior in case of no anchors; Influence of the roof above the shell; and Influence of the foundation rigidity under the bottom plate

  5. Demand management of city gas per season and study of estimating proper size of LNG storage facilities

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Y.H.; Kim, S.D. [Korea Energy Economics Institute, Euiwang (Korea, Republic of)

    1997-09-01

    LNG storage facilities are indispensable to satisfy demand throughout the year by saturating the time difference of supply and demand that appears due to seasonal factors. The necessity of storage facilities is more important in a country like Korea where LNG is not produced at all and imports are relied upon. The problem of deciding how much storage facilities to keep and in what pattern to import LNG is a question to solve in order to minimize the costs related to the construction of LNG storage facilities while not causing any problem in the supply and demand of LNG. This study analyzes how the import of LNG and the consumption pattern of LNG for power generation affect the decision on the size of storage facilities. How the shipping control, and how LNG demand for power generation affect the decision of requirement of storage facilities, and why the possibility of shipping control should be investigated in the aspect of costs is investigated. As a result of this study, I presented necessary basic data for drafting a policy by assessing the minimum requirements of storage facilities needed for balancing the supply and demand with the various shipping control and LNG consumption patterns through simulation up to the year 2010. 10 refs., 33 figs., 66 tabs.

  6. Using of polyamide in construction of supporting blocks of cryogenic tanks on example of LNG container

    Directory of Open Access Journals (Sweden)

    E. Lisowski

    2010-07-01

    Full Text Available Interest in using of cryogenic gases is increasing recently. It particularly applies to LNG (Liquefied Natural Gas, which is relatively inexpensive and environmental friendly. In the liquefied form this gas is highly compressed. One cubic meter of liquefied LNG can be expanded to 660 cubic meters of normal usable gas. At the atmospheric pressure, the liquefaction temperature of LNG is under minus 160 Celsius degrees. Therefore, there is a necessity to store it in a cryogenic tank. A system of reloading port terminals is built in several UE countries, as Spain, Italy. The LNG is delivered to these terminals using the adequately equipped ships. However, there are significant problems with delivering LNG to recipients not connected to the gas network directly. Delivering of liquefied LNG to recipients using the road or rail transport is one of the simplest solutions of this problem. This kind of transport is possible only with using suitable tanks with the adequate insulation and fulfilling the transport requirements. Many scientific research centers carry out investigations on high insulating-power materials. The problem to design and build universal container for road and rail transport was taken on by Cracow University of Technology together with the company Chemet from Tarnowskie Góry. Designed cryogenic tank is a two-walledconstruction with the vacuum between them. Distance between walls is provided by system of supporting blocks made of plastic. Thispaper presents problem of heat transfer between the walls through the supporting blocks. The investigations were carried out both:numerically, using the finite element method and experimentally, using the especially designed and built laboratory test stand, whichallowed to determine heat transfer coefficient.

  7. Kitimat LNG Inc

    International Nuclear Information System (INIS)

    Boulton, R.

    2006-01-01

    Kitimat LNG terminal is the first fully permitted liquefied natural gas (LNG) on the west coast of Canada and the United States. The terminal was designed to have a small environmental footprint, and has the full support of communities and First Nations groups in the area. Regulatory approvals are now in place, and site construction is planned to start in 2007. This presentation provided details of the facility's gas production and liquefaction processes, shipping, and LNG import and regasification terminals. The site was selected due to its deepwater, all-season port and the fact that the Pacific Trail Pipelines provide access to major transmission lines. The terminal will be comprised of an offshore LNG tanker berth and unloading jetty, a construction and tug berth, 2 LNG storage tanks, a separation unit, and send-out pipelines for natural gas and gas liquids. The terminal was designed for maximum LNG receiving flexibility as it can handle a wide variety of gas specifications and will be able to receive the largest possible LNG tankers. Market interest in the terminal has been considerable as investors are increasingly convinced that LNG can provide long-term supply alternatives to the North American gas market. Once operational the terminal will attract supply from the Pacific basin and the Middle East. Western Canadian gas demand is projected to grow at nearly 6 per cent through 2015. It was concluded that marine safety is crucial to the successful operation of the terminal. Details of safety plans formed after consultation with various organizations were presented. refs., tabs., figs

  8. 76 FR 77814 - Cameron LNG, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed BOG...

    Science.gov (United States)

    2011-12-14

    .... Summary of the Proposed Project Cameron LNG plans to construct and operate facilities necessary to liquefy boil-off gas (BOG) at its existing liquefied natural gas (LNG) terminal in Cameron Parish, Louisiana... sufficient LNG in each of the terminal's storage tanks. Currently, BOG is sent out via delivery into the...

  9. Using of polyamide in construction of supporting blocks of cryogenic tanks on example of LNG container

    OpenAIRE

    E. Lisowski; W. Czyżycki; K. Łazarczyk

    2010-01-01

    Interest in using of cryogenic gases is increasing recently. It particularly applies to LNG (Liquefied Natural Gas), which is relatively inexpensive and environmental friendly. In the liquefied form this gas is highly compressed. One cubic meter of liquefied LNG can be expanded to 660 cubic meters of normal usable gas. At the atmospheric pressure, the liquefaction temperature of LNG is under minus 160 Celsius degrees. Therefore, there is a necessity to store it in a cryogenic tank. A system o...

  10. Impact resistance cryogenic bunker fuel tanks

    NARCIS (Netherlands)

    Voormeeren, L.O.; Atli-Veltin, B.; Vredeveldt, A.W.

    2014-01-01

    The increasing use of liquefied natural gas (LNG) as bunker fuel in ships, calls for an elaborate study regarding the risks involved. One particular issue is the vulnerability of cryogenic LNG storage tanks with respect to impact loadings, such as ship collisions and dropped objects. This requires

  11. The LNG Industry in 2006

    International Nuclear Information System (INIS)

    Anon.

    2007-01-01

    was close with 13.3%. Algeria's share decreased to 10.9%. The spot and short-term imports (based on importing contracts whose duration is equal to or less than 4 years) amounted to 56 10 6 m 3 in liquid form (438 cargoes) as against 40 10 6 m 3 (348 cargoes) in 2005, accounting for 16% of the world LNG trade. Tanker fleet: The world LNG tanker fleet consisted of 219 vessels at the end of 2006. Five of these, delivered in 2006, the Excelerate, the Seri Angkasa, the Seri Anggun, the LNG Lokoya and the Gaz de France Energy, did not unload any cargo during the year. Liquefaction plants: There were 18 sites of liquefaction plants in operation at the end of 2006 with the start-up of the Darwin LNG plant in Australia. Two new trains were commissioned in 2006: one at Bonny Island in Nigeria and one at Darwin in Australia. The total capacity of all liquefaction plants amounted to about 413 10 6 m 3 of LNG per year, or 188 10 6 t for 78 liquefaction trains. Considering a total production of 348.4 10 6 m 3 of LNG, the average utilization almost reached 85%. The total storage capacity amounted to approximately 6 10 6 m 3 of LNG for 66 storage tanks, representing almost six days of production. Re-gasification plants: There were 57 re-gasification plants in the world. Six terminals went on stream in 2006: Sagunto in Spain, Aliaga in Turkey (completed in 2002), Altamira in Mexico, Guangdong Dapeng in China and Mizushima and Sakai in Japan. The total send-out capacity of the facilities in operation amounted to 516 billion Nm 3 NG/year and their storage capacity to 25.8 10 6 m 3 of LNG with 283 storage tanks

  12. Storage tank stratification/rollover alarm management. Liquefied natural gas

    Energy Technology Data Exchange (ETDEWEB)

    Versluijs, Pieter [Waertsilae France SAS, Calais (France). Waertsilae Whessoe PCT

    2011-03-21

    Liquefied natural gas (LNG) terminals need to be able to store multiple grades of LNG, and to have sufficient storage capacity available for all of them. Managing storage to ensure availability and to optimise the use of storage capacity is, therefore, essential. This article discusses ways of achieving these aims.

  13. Fuel storage tank

    International Nuclear Information System (INIS)

    Peehs, M.; Stehle, H.; Weidinger, H.

    1979-01-01

    The stationary fuel storage tank is immersed below the water level in the spent fuel storage pool. In it there is placed a fuel assembly within a cage. Moreover, the storage tank has got a water filling and a gas buffer. The water in the storage tank is connected with the pool water by means of a filter, a surge tank and a water purification facility, temperature and pressure monitoring being performed. In the buffer compartment there are arranged catalysts a glow plugs for recombination of radiolysis products into water. The supply of water into the storage tank is performed through the gas buffer compartment. (DG) [de

  14. 76 FR 4885 - Freeport LNG Expansion, L.P. and FLNG Liquefaction, LLC Application for Long-Term Authorization...

    Science.gov (United States)

    2011-01-27

    ... order dated September 26, 2006 \\1\\: (1) A second marine berthing dock; (2) A third LNG storage tank; and... world.\\7\\ FLEX states that many natural gas and LNG supply contracts in European and Asian markets are... public interest. First, FLEX contends that the project will cause direct and indirect job creation...

  15. LNG (liquefied natural gas): A necessary part in China's future energy infrastructure

    International Nuclear Information System (INIS)

    Lin, Wensheng; Gu, Anzhong; Zhang, Na

    2010-01-01

    This paper presents an overview of the LNG industry in China, covering LNG plants, receiving terminals, transportation, and applications. Small and medium scale LNG plants with different liquefaction processes have already been built or are being built. China's first two LNG receiving terminals have been put into operation in Guangdong and Fujian, another one is being built in Shanghai, and more are being planned. China is now able to manufacture LNG road tanks and containers. The construction of the first two LNG carriers has been completed. LNG satellite stations have been built, and LNG vehicles have been manufactured. LNG related regulations and standards are being established. The prospects of LNG in China are also discussed in this paper. Interesting topics such as small-scale liquefiers, LNG cold energy utilization, coal bed methane liquefaction, LNG plant on board (FPSO - floating production, storage, and off-loading), and LNG price are introduced and analyzed. To meet the increasing demand for natural gas, China needs to build about 10 large LNG receiving terminals, and to import LNG at the level of more than 20 bcm (billion cubic metre) per year by 2020. (author)

  16. Siting considerations for LNG import terminals

    Energy Technology Data Exchange (ETDEWEB)

    Meratla, Z. [CDS Research Ltd., Vancouver, BC (Canada)

    2005-07-01

    Site selection criteria for liquefied natural gas (LNG) facilities and terminals were reviewed in this PowerPoint presentation. Onshore and offshore sites were discussed. Typical public opposition issues were examined, including public concerns over safety and the environment. Low key consultation processes with local communities was advised to assess levels of interest and opposition during initial stages. It was suggested that desirable LNG sites should not be visible from local communities. Remoteness from built-up areas was advised, as well as ensuring that sites meet the requirements of future expansion and large LNG carriers. Issues concerning waterway drawbacks and exclusion zones were examined, as well as the relative merits of onshore and offshore terminals. It was noted that onshore terminals are accessible to personnel as well as outside emergency response resources, and are less susceptible to weather related downtime. In addition, onshore spills are generally impounded. Offshore LNG import terminals are visible from shorelines and susceptible to stray marine traffic and abnormal events. Siting considerations for offshore facilities include sensitive areas; shipping channels; foundation issues; shipping lane access; and offshore pipeline lengths. Issues concerning loading arms, remote flare systems, integral ballast and process equipment for offshore facilities were discussed. Membrane type storage systems and tank construction details were presented as well as details of self supporting storage systems. A comparison of gravity-based structures and floating facilities was presented. It was concluded that floating LNG facilities have well developed security procedures, passive protection and automatic intruder detection alarms. tabs., figs.

  17. Boil off gas (BOG) management in Spanish liquid natural gas (LNG) terminals

    Energy Technology Data Exchange (ETDEWEB)

    Querol, E.; Gonzalez-Regueral, B.; Garcia-Torrent, J.; Garcia-Martinez, M.J. [Departamento de Ingenieria Quimica y Combustibles, Escuela Tecnica Superior de Ingenieros de Minas, Universidad Politecnica de Madrid, c. Alenza 4, 28003 Madrid (Spain)

    2010-11-15

    Spain is a country with six LNG terminals in operation and three more scheduled for 2011. At the same time an increasing number of LNG tanks are under construction to compensate the Spanish lack of underground storage. A method for evaluating the daily boil off generated is presented in this paper. This method is applied to evaluate the increase of BOG to be handle by LNG terminals in 2016, studying the best commercially available solution to be installed. Finally, as a solution to tackle with the BOG a cogeneration plant is suggested. This option will reduce terminal's operational costs increasing its availability. (author)

  18. LNG plants in the US and abroad

    International Nuclear Information System (INIS)

    Blazek, C.F.; Biederman, R.T.

    1992-01-01

    The Institute of Gas Technology recently conducted a comprehensive survey of LNG production and storage facilities in North America. This survey was performed as part of IGT's LNG Observer newsletter which covers both domestic and international LNG news, reports on LNG related economics and statistics, and routinely conducts interviews with key industry leaders. In addition to providing consulting services to the LNG industry, IGT has cosponsored the International Conference on Liquefied Natural Gas for the part 20 years. The objective of this paper is to present a summary of our recent survey results as well as provide an overview of world LNG trade. This information is important in assessing the potential near term availability of LNG for transportation applications. The IGT LNG Survey appraised the capacity and current market activity of LNG peak shaving, satellite storage, and import receiving facilities in the United States and Canada. Information was requested from facilities on three main topics: liquefaction, storage, and regasification. Additional questions were posed regarding the year of operation, designer/contractor for liquefaction cycle and storage, source of LNG (for storage-only facilities), plans for expansion, and level of interest in providing LNG as a vehicle fuel. The IGT LNG Survey has to date received information on 56 LNG peak shaving facilities, 28 satellite storage facilities, and 4 LNG import receiving terminals

  19. Flexible LNG supply, storage and price formation in a global natural gas market

    Science.gov (United States)

    Hayes, Mark Hanley

    The body of work included in this dissertation explores the interaction of the growing, flexible liquefied natural gas (LNG) trade with the fundamentals of pipeline gas supply, gas storage, and gas consumption. By nature of its uses---largely for residential heating and electric power generation---the consumption of natural gas is highly variable both seasonally and on less predictable daily and weekly timescales. Flexible LNG trade will interconnect previously isolated regional gas markets, each with non-correlated variability in gas demand, differing gas storage costs, and heterogeneous institutional structures. The dissertation employs a series of analytical models to address key issues that will affect the expansion of the LNG trade and the implications for gas prices, investment and energy policy. First, I employ an optimization model to evaluate the fundamentals of seasonal LNG swing between markets with non-correlated gas demand (the U.S. and Europe). The model provides insights about the interaction of LNG trade with gas storage and price formation in interconnected regional markets. I then explore how random (stochastic) variability in gas demand will drive spot cargo movements and covariation in regional gas prices. Finally, I analyze the different institutional structures of the gas markets in the U.S. and Europe and consider how managed gas markets in Europe---without a competitive wholesale gas market---may effectively "export" supply and price volatility to countries with more competitive gas markets, such as the U.S.

  20. LNG (liquefied natural gas): A necessary part in China's future energy infrastructure

    Energy Technology Data Exchange (ETDEWEB)

    Lin, Wensheng; Gu, Anzhong [Institute of Refrigeration and Cryogenics, Shanghai Jiao Tong University, Shanghai 200240 (China); Zhang, Na [Institute of Engineering Thermophysics, Chinese Academy of Sciences, Beijing 100080 (China)

    2010-11-15

    This paper presents an overview of the LNG industry in China, covering LNG plants, receiving terminals, transportation, and applications. Small and medium scale LNG plants with different liquefaction processes have already been built or are being built. China's first two LNG receiving terminals have been put into operation in Guangdong and Fujian, another one is being built in Shanghai, and more are being planned. China is now able to manufacture LNG road tanks and containers. The construction of the first two LNG carriers has been completed. LNG satellite stations have been built, and LNG vehicles have been manufactured. LNG related regulations and standards are being established. The prospects of LNG in China are also discussed in this paper. Interesting topics such as small-scale liquefiers, LNG cold energy utilization, coal bed methane liquefaction, LNG plant on board (FPSO - floating production, storage, and off-loading), and LNG price are introduced and analyzed. To meet the increasing demand for natural gas, China needs to build about 10 large LNG receiving terminals, and to import LNG at the level of more than 20 bcm (billion cubic metre) per year by 2020. (author)

  1. Underground storage tanks

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    Environmental contamination from leaking underground storage tanks poses a significant threat to human health and the environment. An estimated five to six million underground storage tanks containing hazardous substances or petroleum products are in use in the US. Originally placed underground as a fire prevention measure, these tanks have substantially reduced the damages from stored flammable liquids. However, an estimated 400,000 underground tanks are thought to be leaking now, and many more will begin to leak in the near future. Products released from these leaking tanks can threaten groundwater supplies, damage sewer lines and buried cables, poison crops, and lead to fires and explosions. As required by the Hazardous and Solid Waste Amendments (HSWA), the EPA has been developing a comprehensive regulatory program for underground storage tanks. The EPA proposed three sets of regulations pertaining to underground tanks. The first addressed technical requirements for petroleum and hazardous substance tanks, including new tank performance standards, release detection, release reporting and investigation, corrective action, and tank closure. The second proposed regulation addresses financial responsibility requirements for underground petroleum tanks. The third addressed standards for approval of state tank programs

  2. 46 CFR 154.703 - Methane (LNG).

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Methane (LNG). 154.703 Section 154.703 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SAFETY STANDARDS FOR... and Temperature Control § 154.703 Methane (LNG). Unless a cargo tank carrying methane (LNG) can...

  3. Thermodynamic and heat transfer analysis of LNG energy recovery for power production

    International Nuclear Information System (INIS)

    Franco, A; Casarosa, C

    2014-01-01

    An important option to transport the gas is to convert it into liquid natural gas (LNG) and convey it using insulated LNG tankers. At receiving terminals, the LNG is offloaded into storage tanks and then pumped at the required pressure and vaporized for final transmission to the pipeline. The LNG production process consumes a considerable amount of energy, while the cold availability, as also known as cold energy, has been stored in LNG. At a receiving terminal, LNG needs to be evaporated into gas at environmental temperature before fed into the gas distribution system. Seawater is commonly used for the regasification process of the LNG. In the present paper, after a general analysis of the perspectives of the various thermodynamic schemes proposed for power production from the regasification, a detailed analysis of enhanced direct expansion system is carried out in order to identify the upper level of the energy that can be recovered. The analysis outlines that power production typical of optimized ORC plant configurations (120 kJ/kg) can be obtained with direct expansion solutions

  4. Thermodynamic and heat transfer analysis of LNG energy recovery for power production

    Science.gov (United States)

    Franco, A.; Casarosa, C.

    2014-11-01

    An important option to transport the gas is to convert it into liquid natural gas (LNG) and convey it using insulated LNG tankers. At receiving terminals, the LNG is offloaded into storage tanks and then pumped at the required pressure and vaporized for final transmission to the pipeline. The LNG production process consumes a considerable amount of energy, while the cold availability, as also known as cold energy, has been stored in LNG. At a receiving terminal, LNG needs to be evaporated into gas at environmental temperature before fed into the gas distribution system. Seawater is commonly used for the regasification process of the LNG. In the present paper, after a general analysis of the perspectives of the various thermodynamic schemes proposed for power production from the regasification, a detailed analysis of enhanced direct expansion system is carried out in order to identify the upper level of the energy that can be recovered. The analysis outlines that power production typical of optimized ORC plant configurations (120 kJ/kg) can be obtained with direct expansion solutions.

  5. Achievement report for fiscal 1993. International clean energy system technology to utilize hydrogen - WE-NET (Sub-task 5. Development of hydrogen transportation and storage technology - Edition 3. Development of liquid hydrogen storage facility); 1993 nendo seika hokokusho. Suiso riyo kokusai clean energy system gijutsu (WE-NET) (Sub tusk 5: Suiso yuso chozo gijutsu no kaihatsu - Dai 3 hen. Ekitai suiso chozo setsubi no kaihatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-01

    With an intention to establish a technology required to build a hydrogen storage tank with a storage capacity of 50,000 m{sup 3} as the target shown in the basic plan for WE-NET, the current fiscal year has performed the technical literature surveys to identify the existing technologies. In the survey on the similar large storage system, a liquefied natural gas (LNG) was taken up, and the survey on the LNG bases in Japan was carried out. With regard to the existing liquefied hydrogen storage system, surveys were performed on the test site for developing the liquefied hydrogen/liquefied oxygen engines, the rocket launch sites, and liquefied hydrogen manufacturing plant. In relation with peripheral technologies for the underground storage tank being an excellent anti-seismic form, the LNG underground storage facilities were surveyed. Regarding the rock mass storage tank, surveys were carried out on the LPG rock mass storage having been used practically, and the LNG rock mass storage that is in the demonstration phase. In the research on storage facilities, surveys were executed on the forms and heat insulation structures of the similar large low-temperature storage tanks, the use record of the existing liquefied hydrogen storage tanks, heat insulating materials, and heat insulating structures. (NEDO)

  6. 77 FR 788 - Southern LNG Company, L.L.C.; Notice of Application

    Science.gov (United States)

    2012-01-06

    ... a new 2,500 horsepower electric- driven compressor unit at its liquefied natural gas (LNG) terminal... referenced docket pursuant to section 3(a) of the Natural Gas Act (NGA) and Part 153 of the Federal Energy... to allow boil-off gas generated naturally within its storage tanks to be delivered to the downstream...

  7. 40 CFR 280.220 - Ownership of an underground storage tank or underground storage tank system or facility or...

    Science.gov (United States)

    2010-07-01

    ... tank or underground storage tank system or facility or property on which an underground storage tank or underground storage tank system is located. 280.220 Section 280.220 Protection of Environment ENVIRONMENTAL... underground storage tank or underground storage tank system or facility or property on which an underground...

  8. Small Scale LNG in Europe

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-09-15

    The conference has 19 presentation that addresses topics within the economic and marketing aspects, distribution and transmission, size, operation and design of LNG production units, transportation aspects, technology assessment, storage of LNG and risk and safety aspects of the use and production of LNG. Some LNG application cases are also presented.

  9. Small Scale LNG in Europe

    International Nuclear Information System (INIS)

    2005-09-01

    The conference has 19 presentation that addresses topics within the economic and marketing aspects, distribution and transmission, size, operation and design of LNG production units, transportation aspects, technology assessment, storage of LNG and risk and safety aspects of the use and production of LNG. Some LNG application cases are also presented

  10. Aboveground storage tanks

    International Nuclear Information System (INIS)

    Rizzo, J.A.

    1992-01-01

    With the 1988 promulgation of the comprehensive Resource Conservation and Recovery Act (RCRA) regulations for underground storage of petroleum and hazardous substances, many existing underground storage tank (UST) owners have been considering making the move to aboveground storage. While on the surface, this may appear to be the cure-all to avoiding the underground leakage dilemma, there are many other new and different issues to consider with aboveground storage. The greatest misconception is that by storing materials above ground, there is no risk of subsurface environmental problems. it should be noted that with the aboveground storage tank (AGST) systems, there is still considerable risk of environmental contamination, either by the failure of onground tank bottoms or the spillage of product onto the ground surface where it subsequently finds its way to the ground water. In addition, there are added safety concerns that must be addressed. So what are the other specific areas of concern besides environmental to be addressed when making the decision between underground and aboveground tanks? The primary issues that will be addressed in this paper are: Safety, Product Losses, Cost Comparison of USTs vs AGSTs, Space Availability/Accessibility, Precipitation Handling, Aesthetics and Security, Pending and Existing Regulations

  11. 76 FR 53440 - Freeport LNG Development, LP; Freeport LNG Expansion, LP; FLNG Liquefaction LLC; Notice of Intent...

    Science.gov (United States)

    2011-08-26

    .... Summary of the Planned Project Freeport plans to add natural gas liquefaction and exportation capabilities to its existing liquefied natural gas (LNG) import terminal on Quintana Island in Brazoria County... tank, and additional LNG vaporization and natural gas send-out facilities that were previously...

  12. Storage Tanks - Selection Of Type, Design Code And Tank Sizing

    International Nuclear Information System (INIS)

    Shatla, M.N; El Hady, M.

    2004-01-01

    The present work gives an insight into the proper selection of type, design code and sizing of storage tanks used in the Petroleum and Process industries. In this work, storage tanks are classified based on their design conditions. Suitable design codes and their limitations are discussed for each tank type. The option of storage under high pressure and ambient temperature, in spherical and cigar tanks, is compared to the option of storage under low temperature and slight pressure (close to ambient) in low temperature and cryogenic tanks. The discussion is extended to the types of low temperature and cryogenic tanks and recommendations are given to select their types. A study of pressurized tanks designed according to ASME code, conducted in the present work, reveals that tanks designed according to ASME Section VIII DIV 2 provides cost savings over tanks designed according to ASME Section VIII DlV 1. The present work is extended to discuss the parameters that affect sizing of flat bottom cylindrical tanks. The analysis shows the effect of height-to-diameter ratio on tank instability and foundation loads

  13. Thermal analysis of the position of the freezing front around an LNG in-ground storage tank with a heat barrier

    Science.gov (United States)

    Watanabe, O.; Tanaka, M.

    A technique of controlling the extent of the freezing zone created by in ground liquefied natural gas storage tanks by installing a heat barrier is described. The freezing conditions around three representative tanks after operating the system were compared.

  14. Pad B Liquid Hydrogen Storage Tank

    Science.gov (United States)

    Hall, Felicia

    2007-01-01

    Kennedy Space Center is home to two liquid hydrogen storage tanks, one at each launch pad of Launch Complex 39. The liquid hydrogen storage tank at Launch Pad B has a significantly higher boil off rate that the liquid hydrogen storage tank at Launch Pad A. This research looks at various calculations concerning the at Launch Pad B in an attempt to develop a solution to the excess boil off rate. We will look at Perlite levels inside the tank, Boil off rates, conductive heat transfer, and radiant heat transfer through the tank. As a conclusion to the research, we will model the effects of placing an external insulation to the tank in order to reduce the boil off rate and increase the economic efficiency of the liquid hydrogen storage tanks.

  15. Concept for a LNG Gas Handling System for a Dual Fuel Engine

    Directory of Open Access Journals (Sweden)

    Michael Rachow

    2017-09-01

    Full Text Available Nowadays, ships are using LNG as main engine fuel because based on the facts that LNG has no sulphur content, and its combustion process, LNG produces low NOx content compared to heavy fuel oil and marine diesel oil. LNG is not only produces low gas emission, but may have economic advantages. In the engine laboratory of maritime studies department in Warnemunde, Germany, there is a diesel engine type MAN 6L23/30 A, where the mode operation of these engine would be changed to dual fuel engine mode operation. Therefore, in this thesis, the use dual fuel engine will be compared where it will utilize natural gas and marine diesel oil and select the required components for fuel gas supply system. By conducting the process calculation, engine MAN 6L23/30 A requires the capacity natural gas of 12.908  for 5 days at full load. A concept for LNG supply system would be arranged from storage tank until engine manifold. Germanischer Lloyd and Project Guide of dual fuel engine will be used as a guidelines to develop an optimal design and arrangement which comply with the regulation.

  16. Design and construction of a lNG storage tank in Huelva, Spain

    OpenAIRE

    Editorial, Equipo

    1989-01-01

    This issue contains a number of articles; contents of which are summarized below, giving an overall idea of this outstanding engineering accomplishment. The National Gas Scheme intends to duplicate the consumption of natural gas during the period 1985-1992 to reach 6 % participation in the provision of primary energy by 1992. It is essential a great effort to meet the requirements of this scheme. Among the activities included in the Scheme, we shall mention the construction of a LNG Termin...

  17. LNG transport through pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Pfund, P; Philipps, A

    1975-01-01

    LNG pipelines could help solve some peakshaving problems if operated in conjunction with other facilities that could use the LNG cold recovered during regasification. In some areas at present, LNG is delivered by tanker and regasified near the terminal for transmission through conventional gas pipelines. In other places, utilities liquefy natural gas for easy storage for later peakshaving use. The only chance to avoid the second expensive liquefaction step would be to convey imported LNG through a suitable designed LNG pipeline. The technical problems involved in LNG pipeline construction have basically been solved in recent years, but those pipelines actually constructed have been only short ones. To be economically justified, long-distance LNG lines require additional credit, which could be obtained by selling the LNG cold recovered during regasification to industrial users located in or near the points of gas consumption. Technical details presented cover the pipe material, stress relief, steel composition, pressure enthalpy, bellows-type expansion joints, and mechanical and thermal insulation.

  18. Lightweight Tanks for Storing Liquefied Natural Gas

    Science.gov (United States)

    DeLay, Tom

    2008-01-01

    Single-walled, jacketed aluminum tanks have been conceived for storing liquefied natural gas (LNG) in LNG-fueled motor vehicles. Heretofore, doublewall steel tanks with vacuum between the inner and outer walls have been used for storing LNG. In comparison with the vacuum- insulated steel tanks, the jacketed aluminum tanks weigh less and can be manufactured at lower cost. Costs of using the jacketed aluminum tanks are further reduced in that there is no need for the vacuum pumps heretofore needed to maintain vacuum in the vacuum-insulated tanks.

  19. 40 CFR 280.230 - Operating an underground storage tank or underground storage tank system.

    Science.gov (United States)

    2010-07-01

    ... underground storage tank or underground storage tank system. (a) Operating an UST or UST system prior to...) Operating an UST or UST system after foreclosure. The following provisions apply to a holder who, through..., the purchaser must decide whether to operate or close the UST or UST system in accordance with...

  20. FFTF vertical sodium storage tank preliminary thermal analysis

    International Nuclear Information System (INIS)

    Irwin, J.J.

    1995-01-01

    In the FFTF Shutdown Program, sodium from the primary and secondary heat transport loops, Interim Decay Storage (IDS), and Fuel Storage Facility (FSF) will be transferred to four large storage tanks for temporary storage. Three of the storage tanks will be cylindrical vertical tanks having a diameter of 28 feet, height of 22 feet and fabricated from carbon steel. The fourth tank is a horizontal cylindrical tank but is not the subject of this report. The storage tanks will be located near the FFTF in the 400 Area and rest on a steel-lined concrete slab in an enclosed building. The purpose of this work is to document the thermal analyses that were performed to ensure that the vertical FFTF sodium storage tank design is feasible from a thermal standpoint. The key criterion for this analysis is the time to heat up the storage tank containing frozen sodium at ambient temperature to 400 F. Normal operating conditions include an ambient temperature range of 32 F to 120 F. A key parameter in the evaluation of the sodium storage tank is the type of insulation. The baseline case assumed six inches of calcium silicate insulation. An alternate case assumed refractory fiber (Cerablanket) insulation also with a thickness of six inches. Both cases assumed a total electrical trace heat load of 60 kW, with 24 kW evenly distributed on the bottom head and 36 kW evenly distributed on the tank side wall

  1. 30 CFR 56.4401 - Storage tank foundations.

    Science.gov (United States)

    2010-07-01

    ... tanks settling. ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Storage tank foundations. 56.4401 Section 56... Control Flammable and Combustible Liquids and Gases § 56.4401 Storage tank foundations. Fixed, unburied...

  2. 30 CFR 57.4401 - Storage tank foundations.

    Science.gov (United States)

    2010-07-01

    ... leaks caused by tanks settling. ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Storage tank foundations. 57.4401 Section 57... and Control Flammable and Combustible Liquids and Gases § 57.4401 Storage tank foundations. Fixed...

  3. Research on energy efficiency design index for sea-going LNG carriers

    Science.gov (United States)

    Lin, Yan; Yu, Yanyun; Guan, Guan

    2014-12-01

    This paper describes the characteristics of liquefied natural gas (LNG) carriers briefly. The LNG carrier includes power plant selection, vapor treatment, liquid cargo tank type, etc. Two parameters—fuel substitution rate and recovery of boil of gas (BOG) volume to energy efficiency design index (EEDI) formula are added, and EEDI formula of LNG carriers is established based on ship EEDI formula. Then, based on steam turbine propulsion device of LNG carriers, mathematical models of LNG carriers' reference line value are established in this paper. By verification, the EEDI formula of LNG carriers described in this paper can provide a reference for LNG carrier EEDI calculation and green shipbuilding.

  4. Numerical Investigations of Mixed Convection of Incompressible Viscous Fluid in LNG Storage with a Various Locations of Input and Output Mass

    Directory of Open Access Journals (Sweden)

    Sklyarenko Kristina A.

    2015-01-01

    Full Text Available The article shows the results of mathematical simulation of mixed convection in the low-temperature storage of liquefied natural gas with a regenerative cooling. The regimes of mixed convection in a closed area with the different arrangement of the input and output sections of the masses are investigated. Two-dimensional nonstationary problem in the model of the Navier-Stokes in dimensionless variables “vorticity - stream function - temperature” was examined. Are obtained distributions of the hydrodynamic parameters and temperatures, characteristic basic laws governing the processes being investigated. Detailed circulating currents and carried out analysis of the mechanism of vortices formation and the temperature distribution in the solution for mixed convection mode with low Reynolds and Grashof numbers (Gr = 106, 100 LNG storage tanks.

  5. Design Optimization of a Low Pressure LNG Fuel Supply System

    OpenAIRE

    Nguyen, Kim

    2015-01-01

    In 2014 there were 50 liquefied natural gas (LNG) fuelled ships in operation and around 70 on order worldwide. LNG proves to emit less pollution and considering the present and future emission regulations and optimistic gas fuel prices, LNG would be a preferable option as a marine fuel. The number of LNG fuelled ships is therefore likely to increase significantly the next five to ten years. There are many ways to configure the fuel supply system. The fuel supply system consists of a tank,...

  6. Introduction to the marine transportation of bulk LNG and the design of LNG carriers

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, J J

    1974-03-01

    The marine transportation of bulk LNG is expected to expand considerably in the near future to help supply the continuous and growing demand for energy predicted for the U.S., Japan, and Western Europe. The number of new LNG tankers required to provide for these markets is estimated to be at least 50 new 4.4 million ft/sup 3/ tankers by 1980. The standard LNG tanker size is expected to increase to 7.06 million ft/sup 3/ within 5 yr. In selecting a particular tanker system, prospective ship-owners may have to consider such factors as national and international subsidies, shipyard limitations, and the trend to build certain specialized tanker components in areas other than in the shipyard. This work separation could help reduce tanker construction cost and time--especially important when several ships are to be constructed. Containment techniques available for construction of the cargo tanks include the self-supporting and the integrated designs, with the most economical provided by systems carrying LNG as a bulk cargo slightly subcooled below its boiling temperature at near-atmospheric pressure. All designs must fulfill the requirements for maintaining the approved temperature over the entire hull structure, preventing excess heat leaks into the cargo, providing tight liquid containment of the cargo, controlling the conditions inside and outside, and providing the proper facilities for safe loading and unloading. Materials of construction range from a combination of various grades of mild steel for the hull to the highest grades of aluminum alloys and nickel steels for the tank areas. Insulation includes polyurethane foam, silicon-coated perlite, and balsa wood used with fiberglass, polyurethane foam, or mineral wool. The insulation materials and arrangement must be waterproof, fire-resistant, and suitable to withstand the forces imposed on them. Finally, the tankers must include the proper equipment for LNG handling, pumping, and boiloff control.

  7. Compartmentalized storage tank for electrochemical cell system

    Science.gov (United States)

    Piecuch, Benjamin Michael (Inventor); Dalton, Luke Thomas (Inventor)

    2010-01-01

    A compartmentalized storage tank is disclosed. The compartmentalized storage tank includes a housing, a first fluid storage section disposed within the housing, a second fluid storage section disposed within the housing, the first and second fluid storage sections being separated by a movable divider, and a constant force spring. The constant force spring is disposed between the housing and the movable divider to exert a constant force on the movable divider to cause a pressure P1 in the first fluid storage section to be greater than a pressure P2 in the second fluid storage section, thereby defining a pressure differential.

  8. Glass Bubbles Insulation for Liquid Hydrogen Storage Tanks

    Science.gov (United States)

    Sass, J. P.; SaintCyr, W. W.; Barrett, T. M.; Baumgartner, R. G.; Lott, J. W.; Fesmire, J. E.

    2009-01-01

    A full-scale field application of glass bubbles insulation has been demonstrated in a 218,000 L liquid hydrogen storage tank. This work is the evolution of extensive materials testing, laboratory scale testing, and system studies leading to the use of glass bubbles insulation as a cost efficient and high performance alternative in cryogenic storage tanks of any size. The tank utilized is part of a rocket propulsion test complex at the NASA Stennis Space Center and is a 1960's vintage spherical double wall tank with an evacuated annulus. The original perlite that was removed from the annulus was in pristine condition and showed no signs of deterioration or compaction. Test results show a significant reduction in liquid hydrogen boiloff when compared to recent baseline data prior to removal of the perlite insulation. The data also validates the previous laboratory scale testing (1000 L) and full-scale numerical modeling (3,200,000 L) of boiloff in spherical cryogenic storage tanks. The performance of the tank will continue to be monitored during operation of the tank over the coming years. KEYWORDS: Glass bubble, perlite, insulation, liquid hydrogen, storage tank.

  9. Underground Storage Tanks in Iowa

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — Underground storage tank (UST) sites which store petroleum in Iowa. Includes sites which have been reported to DNR, and have active or removed underground storage...

  10. In-situ strain monitoring in liquid containers of LNG transporting carriers

    Science.gov (United States)

    Oh, Min-Cheol; Seo, Jun-Kyu; Kim, Kyung-Jo; Lee, Sang-Min; Kim, Myung-Hyun

    2008-08-01

    Liquefied natural gas (LNG) transport carriers are exposed to a risk by the repeated bump in the LNG container during the vessel traveling over the wave in ocean. The liquid inside the container, especially when it was not fully contained, make a strong bump onto the insulation panel of the tank wall. The insulation panel consists of several layers of thick polyurethane foam (PUF) to maintain the LNG below the cryogenic temperature, -162°C. Due to the repeated shock on the PUF, a crack could be developed on the tank wall causing a tremendous disaster for LNG carriers. To prevent the accidental crack on the tank, a continuous monitoring of the strain imposed on the PUF is recommended. In this work, a fiber-optic Bragg grating was imbedded inside the PUF for monitoring the strain parallel to the impact direction. The optical fiber sensor with a small diameter of 125 μm was suitable to be inserted in the PUF through a small hole drilled after the PUF was cured. In-situ monitoring of the strain producing the change of Bragg reflection wavelength, a high speed wavelength interrogation method was employed by using an arrayed waveguide grating. By dropping a heavy mass on the PUF, we measured the strain imposed on the insulation panel.

  11. Underground or aboveground storage tanks - A critical decision

    International Nuclear Information System (INIS)

    Rizzo, J.A.

    1992-01-01

    With the 1988 promulgation of the comprehensive Resource Conservation and Recovery Act (RCRA) regulations for underground storage of petroleum and hazardous substances, many existing underground storage tank (UST) owners have been considering making the move to aboveground storage. While on the surface, this may appear to be the cure-all to avoiding the underground leakage dilemma, there are many other new and different issues to consider with aboveground storage. The greatest misconception is that by storing materials above ground, there is no risk of subsurface environmental problems. It should be noted that with the aboveground storage tank (AGST) systems, there is still considerable risk of environmental contamination, either by the failure of onground tank bottoms or the spillage of product onto the ground surface where it subsequently finds its way to the ground water. In addition, there are added safety concerns that must be addressed. The greatest interest in AGSTs comes from managers with small volumes of used oil, fresh oil, solvents, chemicals, or heating oil. Dealing with small capacity tanks is not so different than large bulk storage - and, in fact, it lends itself to more options, such as portable storage, tank within tank configurations and inside installations. So what are the other specific areas of concern besides environmental to be addressed when making the decision between underground and aboveground tanks? The primary issues that will be addressed in this presentation are: (1) safety; (2) product losses; (3) cost comparison of USTs vs AGSTs; (4) space availability/accessibility; (5) precipitation handling; (6) aesthetics and security; (7) pending and existing regulations

  12. Operation modes research of liquefied natural gas storages as a part of the ground complexes equipment

    Directory of Open Access Journals (Sweden)

    N. S. Korolev

    2014-01-01

    experimental data. The estimated time before a rollover differs from the experimental value by 2,7%. The relative error of other modelled characteristics of LNG does not exceed 2,5%.Conclusions are drawn on the possibility to use the technique based on the thermodynamics equations of irreversible processes in a binary methane-ethane mixture to forecast working parameters of LNG storages operation as a part of the ground complexes equipment. The techniques to except the rollover mode can be based on keeping a stable LNG composition in the storage and arranging the fuel mixing when performing operations of storage refill and its draining from rocket fuel tanks at start cancellation.

  13. Steel corrosion in radioactive waste storage tanks

    International Nuclear Information System (INIS)

    Carranza, Ricardo M.; Giordano, Celia M.; Saenz, E.; Weier, Dennis R.

    2004-01-01

    A collaborative study is being conducted by CNEA and USDOE (Department of Energy of the United States of America) to investigate the effects of tank waste chemistry on radioactive waste storage tank corrosion. Radioactive waste is stored in underground storage tanks that contain a combination of salts, consisting primarily of sodium nitrate, sodium nitrite and sodium hydroxide. The USDOE, Office of River Protection at the Hanford Site, has identified a need to conduct a laboratory study to better understand the effects of radioactive waste chemistry on the corrosion of waste storage tanks at the Hanford Site. The USDOE science need (RL-WT079-S Double-Shell Tanks Corrosion Chemistry) called for a multi year effort to identify waste chemistries and temperatures within the double-shell tank (DST) operating limits for corrosion control and operating temperature range that may not provide the expected corrosion protection and to evaluate future operations for the conditions outside the existing corrosion database. Assessment of corrosion damage using simulated (non-radioactive) waste is being made of the double-shell tank wall carbon steel alloy. Evaluation of the influence of exposure time, and electrolyte composition and/or concentration is being also conducted. (author) [es

  14. Mobile storage tank-facility made of Polyethylene for evaporator concentrates

    Energy Technology Data Exchange (ETDEWEB)

    Koischwitz, Ingmar [Gesellschaft fuer Nuklear-Service mbH, 45127 Essen (Germany); Dinter, Andreas [E.ON Kernkraft GmbH, Kernkraftwerk Stade, 21657 Stade (Germany)

    2008-07-01

    In Nuclear Power Plants (NPP) there is the need to store any kind of liquid waste such as contaminated evaporator concentrates. NPPs which are in the decommissioning phase had to dismantle their installed storage tanks sometimes at an earlier step than the waste treatment facilities (evaporator). For that reason, GNS has developed a new mobile storage tank-facility (MOTA) for buffer storage of evaporator concentrates by using a capacity of 10 m{sup 3} in total, equally distributed into four storage tanks with a capacity of max 3 m{sup 3} for each. With this modular design it is even easier to install storage tanks in any location in any NPP in Germany. The design of the mobile storage tank-facility will be described under chemical engineering aspects as well as the results from the first experiences during the cold test at the end of the construction phase. GNS applied for a license to use and install the mobile storage tank-facility in nuclear installations and NPPs in Germany in accordance with chap. 7 of the Radioprotection Provision (Strahlenschutzverordnung) in Germany. GNS gets this license in February 2008 and will put the mobile storage tank system into operation in the first quarter of 2008 in Stade NPP. (authors)

  15. Mobile storage tank-facility made of Polyethylene for evaporator concentrates

    International Nuclear Information System (INIS)

    Koischwitz, Ingmar; Dinter, Andreas

    2008-01-01

    In Nuclear Power Plants (NPP) there is the need to store any kind of liquid waste such as contaminated evaporator concentrates. NPPs which are in the decommissioning phase had to dismantle their installed storage tanks sometimes at an earlier step than the waste treatment facilities (evaporator). For that reason, GNS has developed a new mobile storage tank-facility (MOTA) for buffer storage of evaporator concentrates by using a capacity of 10 m 3 in total, equally distributed into four storage tanks with a capacity of max 3 m 3 for each. With this modular design it is even easier to install storage tanks in any location in any NPP in Germany. The design of the mobile storage tank-facility will be described under chemical engineering aspects as well as the results from the first experiences during the cold test at the end of the construction phase. GNS applied for a license to use and install the mobile storage tank-facility in nuclear installations and NPPs in Germany in accordance with chap. 7 of the Radioprotection Provision (Strahlenschutzverordnung) in Germany. GNS gets this license in February 2008 and will put the mobile storage tank system into operation in the first quarter of 2008 in Stade NPP. (authors)

  16. LNG - Status in Denmark. Technology and potential. Project report

    Energy Technology Data Exchange (ETDEWEB)

    Naeslund, M.

    2012-05-15

    The interest for LNG both on a small and a large scale is increasing worldwide. The experiences and knowledge on LNG is limited in Denmark. The Danish gas companies' Technical Management Group (TCG) has asked for a status report including a technology description and an evaluation of the potential in Denmark. A survey of primarily small-scale LNG technology is done in the report. The focus is motivated by the new areas of gas utilisation that become possible with small-scale LNG. Small-scale LNG in this study is defined as LNG stored and used at the application or in an isolated gas grid. The small-scale use of LNG has today an almost negligible share of the total LNG trade but offers interesting new applications for gas utilisation. LNG on a small scale can be used primarily as: 1) Ship fuel. 2) Truck fuel (heavy duty long distance). 3) Individual users not connected to the natural gas grid. 4) Backup for upgraded biogas to individual users and vehicle fleets. 5) Security of supply or supply enhancement of heavily loaded parts of the gas grid. 6) Small-scale storage and/or peak shaving. All but the first topics are natural uses for the current Danish gas distributors. LNG as ship fuel may engage other specialized LNG companies. The report contains a technical description of the parts in primarily small-scale LNG handling and operation. Liquefaction, transport, storage, engine technologies, gas quality and safety aspects related to LNG are covered. There seem to be two more or less separate paths for LNG in Denmark, onshore and off-shore use. These are not, apparently, sharing their experiences and knowledge. Rules and regulations are also different which may create some problems in the interface, for example ship bunkering. Further studies are suggested in the area of gas quality and engine technologies and adaptation of foreign guidelines for small-scale installations to Danish conditions. These guidelines ought to be based on international standards and

  17. Polymeric hydrogen diffusion barrier, high-pressure storage tank so equipped, method of fabricating a storage tank and method of preventing hydrogen diffusion

    Science.gov (United States)

    Lessing, Paul A [Idaho Falls, ID

    2008-07-22

    An electrochemically active hydrogen diffusion barrier which comprises an anode layer, a cathode layer, and an intermediate electrolyte layer, which is conductive to protons and substantially impermeable to hydrogen. A catalytic metal present in or adjacent to the anode layer catalyzes an electrochemical reaction that converts any hydrogen that diffuses through the electrolyte layer to protons and electrons. The protons and electrons are transported to the cathode layer and reacted to form hydrogen. The hydrogen diffusion barrier is applied to a polymeric substrate used in a storage tank to store hydrogen under high pressure. A storage tank equipped with the electrochemically active hydrogen diffusion barrier, a method of fabricating the storage tank, and a method of preventing hydrogen from diffusing out of a storage tank are also disclosed.

  18. Computer modeling of ORNL storage tank sludge mobilization and mixing

    International Nuclear Information System (INIS)

    Terrones, G.; Eyler, L.L.

    1993-09-01

    This report presents and analyzes the results of the computer modeling of mixing and mobilization of sludge in horizontal, cylindrical storage tanks using submerged liquid jets. The computer modeling uses the TEMPEST computational fluid dynamics computer program. The horizontal, cylindrical storage tank configuration is similar to the Melton Valley Storage Tanks (MVST) at Oak Ridge National (ORNL). The MVST tank contents exhibit non-homogeneous, non-Newtonian rheology characteristics. The eventual goals of the simulations are to determine under what conditions sludge mobilization using submerged liquid jets is feasible in tanks of this configuration, and to estimate mixing times required to approach homogeneity of the contents of the tanks

  19. 40 CFR 52.1931 - Petroleum storage tank controls.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Petroleum storage tank controls. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oklahoma § 52.1931 Petroleum... plan, the petroleum storage tanks listed in paragraphs (b) through (e) of this section shall be subject...

  20. Underground storage tanks containing hazardous chemicals

    International Nuclear Information System (INIS)

    Wise, R.F.; Starr, J.W.; Maresca, J.W. Jr.; Hillger, R.W.; Tafuri, A.N.

    1991-01-01

    The regulations issued by the United States Environmental Protection Agency in 1988 require, with several exceptions, that underground storage tank systems containing petroleum fuels and hazardous chemicals be routinely tested for releases. This paper summarizes the release detection regulations for tank systems containing chemicals and gives a preliminary assessment of the approaches to release detection currently being used. To make this assessment, detailed discussions were conducted with providers and manufacturers of leak detection equipment and testing services, owners or operators of different types of chemical storage tank systems, and state and local regulators. While these discussions were limited to a small percentage of each type of organization, certain observations are sufficiently distinctive and important that they are reported for further investigation and evaluation. To make it clearer why certain approaches are being used, this paper also summarizes the types of chemicals being stored, the effectiveness of several leak detection testing systems, and the number and characteristics of the tank systems being used to store these products

  1. Cathodic Protection Design Algorithms for Refineries Aboveground Storage Tanks

    Directory of Open Access Journals (Sweden)

    Kosay Abdul sattar Majbor

    2017-12-01

    Full Text Available Storage tanks condition and integrity is maintained by joint application of coating and cathodic protection. Iraq southern region rich in oil and petroleum product refineries need and use plenty of aboveground storage tanks. Iraq went through conflicts over the past thirty five years resulting in holding the oil industry infrastructure behind regarding maintenance and modernization. The primary concern in this work is the design and implementation of cathodic protection systems for the aboveground storage tanks farm in the oil industry. Storage tank external base area and tank internal surface area are to be protected against corrosion using impressed current and sacrificial anode cathodic protection systems. Interactive versatile computer programs are developed to provide the necessary system parameters data including the anode requirements, composition, rating, configuration, etc. Microsoft-Excel datasheet and Visual Basic.Net developed software were used throughout the study in the design of both cathodic protection systems. The case study considered in this work is the eleven aboveground storage tanks farm situated in al-Shauiba refinery in southern IRAQ. The designed cathodic protection systems are to be installed and monitored realistically in the near future. Both systems were designed for a life span of (15-30 years, and all their parameters were within the internationally accepted standards.

  2. Underground storage tank program

    International Nuclear Information System (INIS)

    Lewis, M.W.

    1994-01-01

    Underground storage tanks, UST'S, have become a major component of the Louisville District's Environmental Support Program. The District's Geotechnical and Environmental Engineering Branch has spear-headed an innovative effort to streamline the time, effort and expense for removal, replacement, upgrade and associated cleanup of USTs at military and civil work installations. This program, called Yank-A-Tank, creates generic state-wide contracts for removal, remediation, installation and upgrade of storage tanks for which individual delivery orders are written under the basic contract. The idea is to create a ''JOC type'' contract containing all the components of work necessary to remove, reinstall or upgrade an underground or above ground tank. The contract documents contain a set of generic specifications and unit price books in addition to the standard ''boiler plate'' information. Each contract requires conformance to the specific regulations for the state in which it is issued. The contractor's bid consists of a bid factor which in the multiplier used with the prices in the unit price book. The solicitation is issued as a Request for Proposal (RPP) which allows the government to select a contractor based on technical qualification an well as bid factor. Once the basic contract is awarded individual delivery orders addressing specific areas of work are scoped, negotiated and awarded an modifications to the original contract. The delivery orders utilize the prepriced components and the contractor's factor to determine the value of the work

  3. Integrity assessment of a storage tank

    Energy Technology Data Exchange (ETDEWEB)

    Goncalves, Osorio Correa; Santos, Jose Henrique Gomes dos; Carvalho, Alexis Fernandes [PETROBRAS Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2005-07-01

    In the last internal inspection of a 5000 bbl freshwater storage tank located in a shipping terminal, widespread pitting corrosion was detected on the shell courses. In some of these pits, its depth was such that the remaining thickness was bellow the minimum thickness required according to the design code. Nevertheless, this approach is overly conservative since it does not consider the pits size, depth and spacing. Thanks to advances in stress analysis, new tools are available for the evaluation of damaged equipment widely employed in the oil industry such as pressure vessels, piping and storage tanks. In the present work, the authors present the integrity assessment performed on this tank using the Fitness for Service approach using the methods and procedures contained in the document API RP 579 (Fitness-for-service). (author)

  4. Leak detection for underground storage tanks

    International Nuclear Information System (INIS)

    Durgin, P.B.; Young, T.M.

    1993-01-01

    This symposium was held in New Orleans, Louisiana on January 29, 1992. The purpose of this conference was to provide a forum for exchange of state-of-the-art information on leak detection for underground storage tanks that leaked fuel. A widespread concern was protection of groundwater supplies from these leaking tanks. In some cases, the papers report on research that was conducted two or three years ago but has never been adequately directed to the underground storage tank leak-detection audience. In other cases, the papers report on the latest leak-detection research. The symposium was divided into four sessions that were entitled: Internal Monitoring; External Monitoring; Regulations and Standards; and Site and Risk Evaluation. Individual papers have been cataloged separately for inclusion in the appropriate data bases

  5. Storage Tank Legionella and Community

    Data.gov (United States)

    U.S. Environmental Protection Agency — Storage Tank Legionella and Community. This dataset is associated with the following publication: Qin, K., I. Struewing, J. Santodomingo, D. Lytle, and J. Lu....

  6. [Study on the quantitative estimation method for VOCs emission from petrochemical storage tanks based on tanks 4.0.9d model].

    Science.gov (United States)

    Li, Jing; Wang, Min-Yan; Zhang, Jian; He, Wan-Qing; Nie, Lei; Shao, Xia

    2013-12-01

    VOCs emission from petrochemical storage tanks is one of the important emission sources in the petrochemical industry. In order to find out the VOCs emission amount of petrochemical storage tanks, Tanks 4.0.9d model is utilized to calculate the VOCs emission from different kinds of storage tanks. VOCs emissions from a horizontal tank, a vertical fixed roof tank, an internal floating roof tank and an external floating roof tank were calculated as an example. The consideration of the site meteorological information, the sealing information, the tank content information and unit conversion by using Tanks 4.0.9d model in China was also discussed. Tanks 4.0.9d model can be used to estimate VOCs emissions from petrochemical storage tanks in China as a simple and highly accurate method.

  7. Nondestructive assay of plutonium residue in horizontal storage tanks

    International Nuclear Information System (INIS)

    Marsh, S.F.

    1985-01-01

    Aqueous plutonium recovery and purification processes often involve the temporary storage of plutonium solutions in holding tanks. Because plutonium is known to precipitate from aqueous solutions under certain conditions, there is a continuing need to assay emptied tanks for plutonium residue. A portable gamma spectrometer system, specifically designed for this purpose, provides rapid assay of such plutonium residues in horizontal storage tanks. A means is thus available for the nondestructive analysis of these tanks on a regular schedule to ensure that significant deposits of plutonium are not allowed to accumulate. 5 figs

  8. Safety considerations on LPG storage tanks

    International Nuclear Information System (INIS)

    Paff, R.

    1993-01-01

    The safety of liquefied petroleum gas (LPG) storage tanks, in refineries, petrochemicals plants, or distribution storage, is an important concern. Some serious accidents in recent years, have highlighted the need for a good safety policy for such equipment. Accidents in LPG storage are mainly due to losses of containment of the LPG. Formation of a cloud can lead to a ''Unconfined Vapor Cloud Explosion'' (UVCE). Liquid leakage can lead to pool fires in the retention area. In some circumstances the heat input of the tank, combined with the loss of mechanical resistance of the steel under high temperature, can lead to a BLEVE ''Boiling Liquid Expanding Vapor Explosion''. It is obvious that such equipment needs a proper design, maintenance and operating policy. The details to be considered are set out. (4 figures). (Author)

  9. Mobilization and mixing of settled solids in horizontal storage tanks

    International Nuclear Information System (INIS)

    Cummins, R.L.

    1995-01-01

    Studies were conducted using submerged jets for the mobilization and mixing of settled solids to form a suspension that can easily be removed from storage tanks. These studies focus on the specific problems relating to horizontal, cylindrical storage tanks. Of primary consideration are the storage tanks located at the Oak Ridge National Laboratory which are used for the collection of remote-handled, radioactive liquid wastes. These wastes are in two phases. A layer of undissolved, settled solids varying from 2 to 4 feet in depth under a layer of supernate. Using a surrogate of the tank contents and an approximate 2/3 dimensional scale tank, tests were performed to determine the optimum design and location of suction and discharge nozzles as well as the minimum discharge velocity required to achieve complete mobilization of the solids in the tank

  10. Energy Policy Act of 2005 and Underground Storage Tanks (USTs)

    Science.gov (United States)

    The Energy Policy Act of 2005 significantly affected federal and state underground storage tank programs, required major changes to the programs, and is aimed at reducing underground storage tank releases to our environment.

  11. Hanford Site Waste Storage Tank Information Notebook

    International Nuclear Information System (INIS)

    Husa, E.I.; Raymond, R.E.; Welty, R.K.; Griffith, S.M.; Hanlon, B.M.; Rios, R.R.; Vermeulen, N.J.

    1993-07-01

    This report provides summary data on the radioactive waste stored in underground tanks in the 200 East and West Areas at the Hanford Site. The summary data covers each of the existing 161 Series 100 underground waste storage tanks (500,000 gallons and larger). It also contains information on the design and construction of these tanks. The information in this report is derived from existing reports that document the status of the tanks and their materials. This report also contains interior, surface photographs of each of the 54 Watch List tanks, which are those tanks identified as Priority I Hanford Site Tank Farm Safety Issues in accordance with Public Law 101-510, Section 3137*

  12. Design criteria tank farm storage and staging facility

    International Nuclear Information System (INIS)

    Lott, D.T.

    1995-01-01

    Tank Farms Operations must store/stage material and equipment until work packages are ready to work. Consumable materials are also required to be stored for routine and emergency work. Safety issues based on poor housekeeping and material deterioration due to weather damage has resulted from inadequate storage space. It has been determined that a storage building in close proximity to the Tank Farm work force would be cost effective. This document provides the design criteria for the design of the storage and staging buildings near 272AW and 272WA buildings

  13. Effect of viscosity on seismic response of waste storage tanks

    International Nuclear Information System (INIS)

    Tang, Yu; Uras, R.A.; Chang, Yao-Wen.

    1992-06-01

    The dynamic response of liquid-storage tanks subjected to harmonic excitations and earthquake ground motions has been studied. A rigid tank of negligible mass, rigidly supported at the base having a diameter of 50 ft. and fluid height of 20.4 ft. was used in the computer analysis. The liquid is assumed to have a density of 1.5 g/ml. Viscosity values, μ = 60, 200, 100, and 10,000 cP, were used in the numerical analyses to study the effects of viscosity on sloshing wave height, impulsive and convective pressure on the tank wall, base shear and base moments. Harmonic excitations as well as earthquake ground motions were used as input motions. The harmonic excitations used in the analyses covers a wide range of frequencies, including both the resonant and non-resonant frequencies. Two earthquake motions were used. One matches the Newmark-Hall median response spectrum and is anchored at 0.24 g for a rock site with a damping of 2% and a time duration of 10 s. The other is the 1978 Tabas earthquake which had a peak ZPA of 0.81 g and a time duration of 29 s. A small tank, about 1/15 the size of the typical waste storage tank, was used in the harmonic excitation study to investigate the effect of viscosity on the response of liquid-storage tanks and how the viscosity effect is affected by the size of the storage tank. The results of this study show that for the typical waste storage tank subjected to earthquake motions, the effect of viscosity on sloshing wave height and impulsive and convective pressures is very small and can be neglected. For viscosity effect to become noticeable in the response of the typical waste storage tank, the waste viscosity must be greater than 10,000 cP. This value is far greater than the estimated viscosity value of the high level wastes, which may range from 60 to 200 cP for some tanks

  14. Permanent Closure of the TAN-664 Underground Storage Tank

    Energy Technology Data Exchange (ETDEWEB)

    Bradley K. Griffith

    2011-12-01

    This closure package documents the site assessment and permanent closure of the TAN-664 gasoline underground storage tank in accordance with the regulatory requirements established in 40 CFR 280.71, 'Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks: Out-of-Service UST Systems and Closure.'

  15. Single bi-temperature thermal storage tank for application in solar thermal plant

    Science.gov (United States)

    Litwin, Robert Zachary; Wait, David; Lancet, Robert T.

    2017-05-23

    Thermocline storage tanks for solar power systems are disclosed. A thermocline region is provided between hot and cold storage regions of a fluid within the storage tank cavity. One example storage tank includes spaced apart baffles fixed relative to the tank and arranged within the thermocline region to substantially physically separate the cavity into hot and cold storage regions. In another example, a flexible baffle separated the hot and cold storage regions and deflects as the thermocline region shifts to accommodate changing hot and cold volumes. In yet another example, a controller is configured to move a baffle within the thermocline region in response to flow rates from hot and cold pumps, which are used to pump the fluid.

  16. Tank Waste Remediation System Inactive Miscellaneous Underground Storage Tanks Program Plan

    International Nuclear Information System (INIS)

    Gustavson, R.D.

    1995-12-01

    The Program Management Plan (PMP) describes the approach that will be used to manage the Tank Waste Remediation System (TWRS) Inactive Miscellaneous Underground Storage Tank (IMUST) Program. The plan describes management, technical, and administrative control systems that will be used to plan and control the IMUSTs Program performance. The technical data to determine the IMUSTs status for inclusion in the Single Shell Tank Farm Controlled Clean and Stable (CCS) Program. The second is to identify and implement surveillance, characterization, stabilization, and modifications to support CCS prior to final closure

  17. Decision analysis of Hanford underground storage tank waste retrieval systems

    International Nuclear Information System (INIS)

    Merkhofer, M.W.; Bitz, D.A.; Berry, D.L.; Jardine, L.J.

    1994-05-01

    A decision analysis approach has been proposed for planning the retrieval of hazardous, radioactive, and mixed wastes from underground storage tanks. This paper describes the proposed approach and illustrates its application to the single-shell storage tanks (SSTs) at Hanford, Washington

  18. Criticality Safety Evaluation of Hanford Site High Level Waste Storage Tanks

    Energy Technology Data Exchange (ETDEWEB)

    ROGERS, C.A.

    2000-02-17

    This criticality safety evaluation covers operations for waste in underground storage tanks at the high-level waste tank farms on the Hanford site. This evaluation provides the bases for criticality safety limits and controls to govern receipt, transfer, and long-term storage of tank waste. Justification is provided that a nuclear criticality accident cannot occur for tank farms operations, based on current fissile material and operating conditions.

  19. Criticality Safety Evaluation of Hanford Site High-Level Waste Storage Tanks

    International Nuclear Information System (INIS)

    ROGERS, C.A.

    2000-01-01

    This criticality safety evaluation covers operations for waste in underground storage tanks at the high-level waste tank farms on the Hanford site. This evaluation provides the bases for criticality safety limits and controls to govern receipt, transfer, and long-term storage of tank waste. Justification is provided that a nuclear criticality accident cannot occur for tank farms operations, based on current fissile material and operating conditions

  20. Is a 125,000 M3 class ship always an optimum for LNG carriers 7

    International Nuclear Information System (INIS)

    Grill, A.

    1992-01-01

    When making the inventory of LNG carriers built up to the present day, one can see that ships of 125 to 130,000 m 3 may be considered as a real standard. An increase of ship's size, together with a reduction of the number of ships required on a given trade, must lead to a reduction of transportation cost. It must also be possible to obtain a better correlation between available energy during voyage and propulsion needs by adjusting boil-off rate and adapting the tanks insulation coefficient. The presentation shows the possibility to significantly reduce LNG transportation cost by an optimization of the size for future ships. The study is based on a certain number of typical trades being able to be met when taking into account future foreseeable needs for LNG. The influence of parameters such as type of containment system and number of tanks, type of propulsion, influence of size restrictions, ability to deliver a given amount of LNG per year even in case of one ship temporary out of order is also considered

  1. Method of storing the fuel storage pot in a fuel storage tank for away-from-reactor-storage

    International Nuclear Information System (INIS)

    Ishiguro, Jun-ichi.

    1980-01-01

    Purpose: To prevent the contact of sodium in the away-from-reactor-storage fuel storage tank with sodium in a fuel storage pool having radioactivity ana always retain clean state therein. Method: Sodium is filled in a container body of the away-from-reactor-storage fuel storage tank, and a conduit, a cycling pump, and cooling means are disposed to form a sodium coolant cycling loop. The fuel storage pool is so stored in the container body that the heat of the pool is projected from the liquid surface of the sodium in the container. Therefore, the sodium in the container is isolated from the sodium in the pool containing strong radioactivity to prevent contact of the former sodium from the latter sodium. (Sekiya, K.)

  2. Qualitative Risk Assessment for an LNG Refueling Station and Review of Relevant Safety Issues

    Energy Technology Data Exchange (ETDEWEB)

    Siu, N.; Herring, J.S.; Cadwallader, L.; Reece, W.; Byers, J.

    1998-02-01

    This report is a qualitative assessment of the public and worker risk involved with the operation of a liquefied natural gas (LNG) vehicle refueling facility. This study includes facility maintenance and operations, tank truck deliveries, and end-use vehicle fueling; it does not treat the risks of LNG vehicles on roadways. Accident initiating events are identified by using a Master Logic Diagram, a Failure Modes and Effects Analysis, and historical operating experiences. The event trees were drawn to depict possible sequences of mitigating events following the initiating events. The phenomenology of LNG and other vehicle fuels is discussed to characterize the hazard posed by LNG usage. Based on the risk modeling and analysis, recommendations are given to improve the safety of LNG refueling stations in the areas of procedures and training, station design, and the dissemination of ``best practice`` information throughout the LNG community.

  3. Large-Scale Wireless Temperature Monitoring System for Liquefied Petroleum Gas Storage Tanks

    Directory of Open Access Journals (Sweden)

    Guangwen Fan

    2015-09-01

    Full Text Available Temperature distribution is a critical indicator of the health condition for Liquefied Petroleum Gas (LPG storage tanks. In this paper, we present a large-scale wireless temperature monitoring system to evaluate the safety of LPG storage tanks. The system includes wireless sensors networks, high temperature fiber-optic sensors, and monitoring software. Finally, a case study on real-world LPG storage tanks proves the feasibility of the system. The unique features of wireless transmission, automatic data acquisition and management, local and remote access make the developed system a good alternative for temperature monitoring of LPG storage tanks in practical applications.

  4. Large-Scale Wireless Temperature Monitoring System for Liquefied Petroleum Gas Storage Tanks.

    Science.gov (United States)

    Fan, Guangwen; Shen, Yu; Hao, Xiaowei; Yuan, Zongming; Zhou, Zhi

    2015-09-18

    Temperature distribution is a critical indicator of the health condition for Liquefied Petroleum Gas (LPG) storage tanks. In this paper, we present a large-scale wireless temperature monitoring system to evaluate the safety of LPG storage tanks. The system includes wireless sensors networks, high temperature fiber-optic sensors, and monitoring software. Finally, a case study on real-world LPG storage tanks proves the feasibility of the system. The unique features of wireless transmission, automatic data acquisition and management, local and remote access make the developed system a good alternative for temperature monitoring of LPG storage tanks in practical applications.

  5. Analysis of large concrete storage tank under seismic response

    Energy Technology Data Exchange (ETDEWEB)

    Le, Jingyuan; Cui, Hongcheng; He, Qiang; Ju, Jinsan [China Agricultural University, Beijing (China); You, Xiaochuan [Tsinghua University, Beijing (China)

    2015-01-15

    This study adopted the finite element software ABAQUS to trace the dynamic response history of large reinforced concrete storage tank during different seismic excitations. The dynamic characteristics and failure modes of the tank's structure were investigated by considering the rebar's effect. Calculation results show that the large concrete storage tank remains in safe working conditions under a seismic acceleration of 55 cm/s{sup 2}. The joint of the concrete wall and dome begins to crack when seismic acceleration reaches 250 cm/s{sup 2}. As the earthquake continues, cracks spread until the top of the wall completely fails and stops working. The maximum displacement of the concrete tank and seismic acceleration are in proportion. Peak displacement and stress of the tank always appear behind the maximum acceleration.

  6. Optimization control of LNG regasification plant using Model Predictive Control

    Science.gov (United States)

    Wahid, A.; Adicandra, F. F.

    2018-03-01

    Optimization of liquified natural gas (LNG) regasification plant is important to minimize costs, especially operational costs. Therefore, it is important to choose optimum LNG regasification plant design and maintaining the optimum operating conditions through the implementation of model predictive control (MPC). Optimal tuning parameter for MPC such as P (prediction horizon), M (control of the horizon) and T (sampling time) are achieved by using fine-tuning method. The optimal criterion for design is the minimum amount of energy used and for control is integral of square error (ISE). As a result, the optimum design is scheme 2 which is developed by Devold with an energy savings of 40%. To maintain the optimum conditions, required MPC with P, M and T as follows: tank storage pressure: 90, 2, 1; product pressure: 95, 2, 1; temperature vaporizer: 65, 2, 2; and temperature heater: 35, 6, 5, with ISE value at set point tracking respectively 0.99, 1792.78, 34.89 and 7.54, or improvement of control performance respectively 4.6%, 63.5%, 3.1% and 58.2% compared to PI controller performance. The energy savings that MPC controllers can make when there is a disturbance in temperature rise 1°C of sea water is 0.02 MW.

  7. LNG systems for natural gas propelled ships

    Science.gov (United States)

    Chorowski, M.; Duda, P.; Polinski, J.; Skrzypacz, J.

    2015-12-01

    In order to reduce the atmospheric pollution generated by ships, the International Marine Organization has established Emission Controlled Areas. In these areas, nitrogen oxides, sulphur oxides and particulates emission is strongly controlled. From the beginning of 2015, the ECA covers waters 200 nautical miles from the coast of the US and Canada, the US Caribbean Sea area, the Baltic Sea, the North Sea and the English Channel. From the beginning of 2020, strong emission restrictions will also be in force outside the ECA. This requires newly constructed ships to be either equipped with exhaust gas cleaning devices or propelled with emission free fuels. In comparison to low sulphur Marine Diesel and Marine Gas Oil, LNG is a competitive fuel, both from a technical and economical point of view. LNG can be stored in vacuum insulated tanks fulfilling the difficult requirements of marine regulations. LNG must be vaporized and pressurized to the pressure which is compatible with the engine requirements (usually a few bar). The boil-off must be controlled to avoid the occasional gas release to the atmosphere. This paper presents an LNG system designed and commissioned for a Baltic Sea ferry. The specific technical features and exploitation parameters of the system will be presented. The impact of strict marine regulations on the system's thermo-mechanical construction and its performance will be discussed. The review of possible flow-schemes of LNG marine systems will be presented with respect to the system's cost, maintenance, and reliability.

  8. State Certification of Underground Storage Tanks

    National Research Council Canada - National Science Library

    Granetto, Paul

    1998-01-01

    .... The audit was performed in response to a Senate Armed Services Committee inquiry about whether state environmental regulatory agencies would be able to certify that DoD underground storage tanks...

  9. Polymers for subterranean containment barriers for underground storage tanks (USTs)

    International Nuclear Information System (INIS)

    Heiser, J.H.; Colombo, P.; Clinton, J.

    1992-12-01

    The US Department of Energy (DOE) set up the Underground Storage Tank Integrated Demonstration Program (USTID) to demonstrate technologies for the retrieval and treatment of tank waste, and closure of underground storage tanks (USTs). There are more than 250 underground storage tanks throughout the DOE complex. These tanks contain a wide variety of wastes including high level, low level, transuranic, mixed and hazardous wastes. Many of the tanks have performed beyond the designed lifetime resulting in leakage and contamination of the local geologic media and groundwater. To mitigate this problem it has been proposed that an interim subterranean containment barrier be placed around the tanks. This would minimize or prevent future contamination of soil and groundwater in the event that further tank leakages occur before or during remediation. Use of interim subterranean barriers can also provide sufficient time to evaluate and select appropriate remediation alternatives. The DOE Hanford site was chosen as the demonstration site for containment barrier technologies. A panel of experts for the USTID was convened in February, 1992, to identify technologies for placement of subterranean barriers. The selection was based on the ability of candidate grouts to withstand high radiation doses, high temperatures and aggressive tank waste leachates. The group identified and ranked nine grouting technologies that have potential to place vertical barriers and five for horizontal barriers around the tank. The panel also endorsed placement technologies that require minimal excavation of soil surrounding the tanks

  10. The Effect of Sloshing on a Tank Pressure Build-up Unit

    OpenAIRE

    Banne, Håvard Bolstad

    2017-01-01

    This thesis work has aimed to identify how sloshing will affect a liquefied natural gas (LNG) fuel tank. The physical nature of LNG means it needs to be kept cooled and pressurized in order to remain in a liquid state. By implementing a pressure build-up unit (PBU) it is possible to pressurize the tank vaporizing the tank’s contents, for the vapour then to return to tank in a loop, building pressure in the process. A tank pressure build-up unit has been built in the laboratory ...

  11. Risk management guidelines for petroleum storage tank sites

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-10-01

    These guidelines provide a site management process designed particularly for soil and groundwater pollution originating from existing or former petroleum storage tank (PST) facilities and provide uniform standards for the remediation of polluted PST sites in Alberta. The numerical criteria, risk management objectives and technical information described in this document were compiled from four documents including Remediation Guidelines for Petroleum Storage Tank Sites 1994, the Canada-Wide Standards for Petroleum Hydrocarbons in Soil, Alberta Soil and Water Quality Guidelines for Hydrocarbons at Upstream Oil and Gas Facilities, and Guidelines for Managing Risks at Contaminated Sites in Alberta. The changes in these updated guidelines reflect new remediation criteria and provide a process for determining alternate site-specific management objectives for more petroleum storage tank sites. The guidelines were developed using a risk-based approach that ensures the protection of human health, safety and the environment. The guidelines apply to aboveground and underground storage tank facilities that contain gasoline, diesel, heating oil, and aviation fuel. The guidelines specify requirements by Alberta Environment and the Alberta Fire Code. The chapter on risk management process included information on site investigation, determination of soil type, pollution source removal, land use assessment, selection of exposure pathways, depth of remediation, human inhalation and groundwater protection pathways, and verification of remediation. figs, 4 tabs., 2 appendices.

  12. Dynamic modeling of stratification for chilled water storage tank

    International Nuclear Information System (INIS)

    Osman, Kahar; Al Khaireed, Syed Muhammad Nasrul; Ariffin, Mohd Kamal; Senawi, Mohd Yusoff

    2008-01-01

    Air conditioning of buildings can be costly and energy consuming. Application of thermal energy storage (TES) reduces cost and energy consumption. The efficiency of the overall operation is affected by storage tank sizing design, which affects thermal stratification of water during charging and discharging processes in TES system. In this study, numerical simulation is used to determine the relationship between tank size and good thermal stratification. Three dimensional simulations with different tank height-to-diameter ratio (HD) and inlet Reynolds number (Re) are investigated. The effect of the number of diffuser holes is also studied. For shallow tanks (low HD) simulations, no acceptable thermocline thickness can be seen for all Re experimented. Partial mixing is observed throughout the process. Medium HD tanks simulations show good thermocline behavior and clear distinction between warm and cold water can be seen. Finally, deep tanks (high HD) show less acceptable thermocline thickness as compared to that of medium HD tanks. From this study, doubling and halving the number of diffuser holes show no significant effect on the thermocline behavior

  13. Treatment of radioactive wastes from DOE underground storage tanks

    International Nuclear Information System (INIS)

    Collins, J.L.; Egan, B.Z.; Spencer, B.B.; Chase, C.W.; Anderson, K.K.; Bell, J.T.

    1994-01-01

    Bench-scale batch tests have been conducted with sludge and supernate tank waste from the Melton Valley Storage Tank (MVST) Facility at Oak Ridge National Laboratory (ORNL) to evaluate separation technology process for use in a comprehensive sludge processing flow sheet as a means of concentrating the radionuclides and reducing the volumes of storage tank waste at national sites for final disposal. This paper discusses the separation of the sludge solids and supernate, the basic washing of the sludge solids, the acidic dissolution of the sludge solids, and the removal of the radionuclides from the supernate

  14. Risk based inspection for atmospheric storage tank

    Science.gov (United States)

    Nugroho, Agus; Haryadi, Gunawan Dwi; Ismail, Rifky; Kim, Seon Jin

    2016-04-01

    Corrosion is an attack that occurs on a metallic material as a result of environment's reaction.Thus, it causes atmospheric storage tank's leakage, material loss, environmental pollution, equipment failure and affects the age of process equipment then finally financial damage. Corrosion risk measurement becomesa vital part of Asset Management at the plant for operating any aging asset.This paper provides six case studies dealing with high speed diesel atmospheric storage tank parts at a power plant. A summary of the basic principles and procedures of corrosion risk analysis and RBI applicable to the Process Industries were discussed prior to the study. Semi quantitative method based onAPI 58I Base-Resource Document was employed. The risk associated with corrosion on the equipment in terms of its likelihood and its consequences were discussed. The corrosion risk analysis outcome used to formulate Risk Based Inspection (RBI) method that should be a part of the atmospheric storage tank operation at the plant. RBI gives more concern to inspection resources which are mostly on `High Risk' and `Medium Risk' criteria and less on `Low Risk' shell. Risk categories of the evaluated equipment were illustrated through case study analysis outcome.

  15. Remote inspection of underground storage tanks

    International Nuclear Information System (INIS)

    Griebenow, B.L.; Martinson, L.M.

    1992-01-01

    Westinghouse Idaho Nuclear Company, Inc. (WINCO) operates the Idaho Chemical Processing Plant (ICPP) for the US Department of Energy. The ICPP's mission is to process government-owned spent nuclear fuel. The process involves dissolving the fuel, extracting off uranium, and calcining the waste to a solid form for storage, Prior to calcining, WINCO temporarily stores the liquid waste from this process in eleven 1,135,600-l(300,000-gal), 15,2-m (50-ft)-diam, high-level liquid waste tanks. Each of these stainless steel tanks is contained within an underground concrete vault. The only access to the interior of the tanks is through risers that extend from ground level to the dome of the tanks. WINCO is replacing these tanks because of their age and the fact that they do not meet all of the current design requirements. The tanks will be replaced in two phases. WINCO is now in the Title I design stage for four new tank and vault systems to replace five of the existing systems. The integrity of the six remaining tanks must be verified to continue their use until they can be replaced in the second phase. To perform any integrity analysis, the inner surface of the tanks must be inspected. The remote tank inspection (RTI) robotic system, designed by RedZone Robotics of Pittsburgh, Pennsylvania, was developed to access the interior of the tanks and position various end effectors required to perform tank wall inspections

  16. Underground Storage Tank Integrated Demonstration (UST-ID)

    International Nuclear Information System (INIS)

    1994-02-01

    The DOE complex currently has 332 underground storage tanks (USTs) that have been used to process and store radioactive and chemical mixed waste generated from weapon materials production. Very little of the over 100 million gallons of high-level and low-level radioactive liquid waste has been treated and disposed of in final form. Two waste storage tank design types are prevalent across the DOE complex: single-shell wall and double-shell wall designs. They are made of stainless steel, concrete, and concrete with carbon steel liners, and their capacities vary from 5000 gallons (19 m 3 ) to 10 6 gallons (3785 m 3 ). The tanks have an overburden layer of soil ranging from a few feet to tens of feet. Responding to the need for remediation of tank waste, driven by Federal Facility Compliance Agreements (FFCAs) at all participating sites, the Underground Storage Tank Integrated Demonstration (UST-ID) Program was created by the US DOE Office of Technology Development in February 1991. Its mission is to focus the development, testing, and evaluation of remediation technologies within a system architecture to characterize, retrieve, treat to concentrate, and dispose of radioactive waste stored in USTs at DOE facilities. The ultimate goal is to provide safe and cost-effective solutions that are acceptable to the public and the regulators. The UST-ID has focused on five DOE locations: the Hanford Site, which is the host site, in Richland, Washington; the Fernald Site in Fernald, Ohio; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; the Oak Ridge Reservation in Oak Ridge, Tennessee, and the Savannah River Site in Savannah River, South Carolina

  17. Storage tank materials for biodiesel blends; the analysis of fuel property changes

    Directory of Open Access Journals (Sweden)

    Nurul Komariah Leily

    2017-01-01

    Full Text Available Fuel stability is one of major problem in biodiesel application. Some of the physical properties of biodiesel are commonly changed during storage. The change in physico-chemical properties is strongly correlated to the stability of the fuel. This study is objected to observe the potential materials for biodiesel storage. The test was conducted in three kinds of tank materials, such as glass, HDPE, and stainless steel. The fuel properties are monitored in 12 weeks, while the sample was analyzed every week. Biodiesel used is palm oil based. The storage tanks were placed in a confined indoor space with range of temperature 27–34 °C. The relative humidity and sunshine duration on the location was also evaluated. The observed properties of the fuel blends were density, viscosity and water content. During 12 weeks of storage, the average density of B20 was changed very slightly in all tanks, while the viscosity was tend to increase sharply, especially in polimerics tank. Water content of B20 was increased by the increase of storage time especially in HDPE tank. In short period of storage, the biodiesel blends is found more stable in glass tank due to its versatility to prohibit oxidation, degradation, and its chemical resistance.

  18. Damage detection in hazardous waste storage tank bottoms using ultrasonic guided waves

    Science.gov (United States)

    Cobb, Adam C.; Fisher, Jay L.; Bartlett, Jonathan D.; Earnest, Douglas R.

    2018-04-01

    Detecting damage in storage tanks is performed commercially using a variety of techniques. The most commonly used inspection technologies are magnetic flux leakage (MFL), conventional ultrasonic testing (UT), and leak testing. MFL and UT typically involve manual or robotic scanning of a sensor along the metal surfaces to detect cracks or corrosion wall loss. For inspection of the tank bottom, however, the storage tank is commonly emptied to allow interior access for the inspection system. While there are costs associated with emptying a storage tank for inspection that can be justified in some scenarios, there are situations where emptying the tank is impractical. Robotic, submersible systems have been developed for inspecting these tanks, but there are some storage tanks whose contents are so hazardous that even the use of these systems is untenable. Thus, there is a need to develop an inspection strategy that does not require emptying the tank or insertion of the sensor system into the tank. This paper presents a guided wave system for inspecting the bottom of double-shelled storage tanks (DSTs), with the sensor located on the exterior side-wall of the vessel. The sensor used is an electromagnetic acoustic transducer (EMAT) that generates and receives shear-horizontal guided plate waves using magnetostriction principles. The system operates by scanning the sensor around the circumference of the storage tank and sending guided waves into the tank bottom at regular intervals. The data from multiple locations are combined using the synthetic aperture focusing technique (SAFT) to create a color-mapped image of the vessel thickness changes. The target application of the system described is inspection of DSTs located at the Hanford site, which are million-gallon vessels used to store nuclear waste. Other vessels whose exterior walls are accessible would also be candidates for inspection using the described approach. Experimental results are shown from tests on multiple

  19. Assuring safe interim storage of Hanford high-level tank wastes

    International Nuclear Information System (INIS)

    Bacon, R.F.; Babad, H.; Lerch, R.E.

    1996-01-01

    The federal government established the Hanford Site in South-Eastern Washington near the City of Richland in 1943 to produce plutonium for national defense purposes. The Hanford Site occupies approximately 1,450 square kilometers (560 square miles) of land North of the City of Richland. The production mission ended in 1988, transforming the Hanford Site mission to waste management, environmental restoration, and waste disposal. Thus the primary site mission has shifted from production to the management and disposal of radioactive, hazardous, and mixed waste that exist at the Hanford Site. This paper describes the focus and challenges facing the Tank Waste Remediation System (TWRS) Program related to the dual and parallel missions of interim safe storage and disposal of the tank associated waste. These wastes are presently stored in 2.08E+05 liters (55,000) to 4.16E+06 liters (1,100,000) gallon low-carbon steel tanks. There are 149 single- and 28 double-shell radioactive underground storage tanks, as well as approximately 40 inactive miscellaneous underground storage tanks. In addition, the TWRS mission includes the storage and disposal of the inventory of 1,929 cesium and strontium capsules created as part of waste management efforts. Tank waste was a by-product of producing plutonium and other defense related materials. From 1944 through 1990, four (4) different major chemical processing facilities at the Hanford Site processed irradiated (spent) fuel from defense reactors to separate and recover plutonium for weapons production. As new and improved processes were developed over the last 50 years, the processing efficiency improved and the waste compositions sent to the tanks for storage changed both chemically and radiologically. The earliest separation processes (e.g., bismuth phosphate coprecipitation) carried out in T Plant (1944-1956) and B Plant (1945-1952) recovered only plutonium

  20. Position paper -- Waste storage tank heat removal

    International Nuclear Information System (INIS)

    Stine, M.D.

    1995-01-01

    The purpose of this paper is to develop and document a position on the heat removal system to be used on the waste storage tanks currently being designed for the Multi-Function Waste Tank Facility (MWTF), project W-236A. The current preliminary design for the waste storage primary tank heat removal system consists of the following subsystems: (1) a once-through dome space ventilation system; (2) a recirculation dome space ventilation system; and (3) an annulus ventilation system. Recently completed and ongoing studies have evaluated alternative heat removal systems in an attempt to reduce system costs and to optimize heat removal capabilities. In addition, a thermal/heat transfer analysis is being performed that will provide assurance that the heat removal systems selected will be capable of removing the total primary tank design heat load of 1.25 MBtu/hr at an allowable operating temperature of 190 F. Although 200 F is the design temperature limit, 190 F has been selected as the maximum allowable operating temperature limit based on instrumentation sensitivity, instrumentation location sensitivity, and other factors. Seven options are discussed and recommendations are made

  1. LNG

    International Nuclear Information System (INIS)

    Chabrelie, M.F.; Idir, N.; Hosanski, J.M.; Jonkman, H.; Pelloux-Prayer, D.; Wells, D.

    2007-01-01

    The LNG industry has entered a new step of its development, faster and more complex. The time parameter, the huge investments and the uncertainties relative to the demand growth are some of the factors that control its evolution. How the emergence of 'international price' signals will influence this activity? What supply-demand status can be foreseen from now to 2015? What role LNG would be able to play in terms of modulation management? What are the impacts of environmental constraints on LNG infrastructures? These are the different points discussed during this workshop by the five participants, specialists of the LNG questions. (J.S.)

  2. Particle behaviour consideration to maximize the settling capacity of rainwater storage tanks.

    Science.gov (United States)

    Han, M Y; Mun, J S

    2007-01-01

    Design of a rainwater storage tank is mostly based on the mass balance of rainwater with respect to the tank, considering aspects such as rainfall runoff, water usage and overflow. So far, however, little information is available on the quality aspects of the stored rainwater, such as the behavior of particles, the effect of retention time of the water in the tank and possible influences of system configuration on water quality in the storage tank. In this study, we showed that the performance of rainwater storage tanks could be maximized by recognizing the importance of water quality improvement by sedimentation and the importance of the system configuration within the tank, as well as the efficient collection of runoff. The efficiency of removal of the particles was increased by there being a considerable distance between the inlet and the outlet in the rainwater storage tank. Furthermore, it is recommended that the effective water depth in a rainwater tank be designed to be more than 3 m and that the rainwater be drawn from as close to the water surface as possible by using a floating suction device. An operation method that increases the retention time by stopping rainwater supply when the turbidity of rainwater runoff is high will ensure low turbidity in the rainwater collected from the tank.

  3. Project financing knits parts of costly LNG supply chain

    International Nuclear Information System (INIS)

    Minyard, R.J.; Strode, M.O.

    1997-01-01

    The supply and distribution infrastructure of an LNG project requires project sponsors and LNG buyers to make large, interdependent capital investments. For a grassroots project, substantial investments may be necessary for each link in the supply chain: field development; liquefaction plant and storage; ports and utilities; ships; receiving terminal and related facilities; and end-user facilities such as power stations or a gas distribution network. The huge sums required for these projects make their finance ability critical to implementation. Lenders have become increasingly comfortable with LNG as a business and now have achieved a better understanding of the risks associated with it. Raising debt financing for many future LNG projects, however, will present new and increasingly difficult challenges. The challenge of financing these projects will be formidable: political instability, economic uncertainty, and local currency volatility will have to be recognized and mitigated. Described here is the evolution of financing LNG projects, including the Rasgas LNG project financing which broke new ground in this area. The challenges that lie ahead for sponsors seeking to finance future projects selling LNG to emerging markets are also discussed. And the views of leading experts from the field of project finance, specifically solicited for this article, address major issues that must be resolved for successful financing of these projects

  4. A robotic end effector for inspection of storage tanks

    Energy Technology Data Exchange (ETDEWEB)

    Hughes, G.; Gittleman, M. [Oceaneering Space Systems, Houston, TX (United States)

    1995-10-01

    The structural integrity of waste storage tanks is of primary importance to the DOE, and is one aspect of the High-Level Waste Tank Remediation focus area. Cracks and/or corrosion damage in the inner tank walls can lead to the release of dangerous substances into the environment. The detection and sizing of corrosion and cracking in steel tank walls through remote non destructive evaluation (NDE) is the primary focus of this work.

  5. A robotic end effector for inspection of storage tanks

    International Nuclear Information System (INIS)

    Hughes, G.; Gittleman, M.

    1995-01-01

    The structural integrity of waste storage tanks is of primary importance to the DOE, and is one aspect of the High-Level Waste Tank Remediation focus area. Cracks and/or corrosion damage in the inner tank walls can lead to the release of dangerous substances into the environment. The detection and sizing of corrosion and cracking in steel tank walls through remote non destructive evaluation (NDE) is the primary focus of this work

  6. VOLUMETRIC LEAK DETECTION IN LARGE UNDERGROUND STORAGE TANKS - VOLUME I

    Science.gov (United States)

    A set of experiments was conducted to determine whether volumetric leak detection system presently used to test underground storage tanks (USTs) up to 38,000 L (10,000 gal) in capacity could meet EPA's regulatory standards for tank tightness and automatic tank gauging systems whe...

  7. Jet mixing long horizontal storage tanks

    International Nuclear Information System (INIS)

    Perona, J.J.; Hylton, T.D.; Youngblood, E.L.; Cummins, R.L.

    1994-12-01

    Large storage tanks may require mixing to achieve homogeneity of contents for several reasons: prior to sampling for mass balance purposes, for blending in reagents, for suspending settled solids for removal, or for use as a feed tank to a process. At ORNL, mixed waste evaporator concentrates are stored in 50,000-gal tanks, about 12 ft in diameter and 60 ft long. This tank configuration has the advantage of permitting transport by truck and therefore fabrication in the shop rather than in the field. Jet mixing experiments were carried out on two model tanks: a 230-gal (1/6-linear-scale) Plexiglas tank and a 25,000-gal tank (about 2/3 linear scale). Mixing times were measured using sodium chloride tracer and several conductivity probes distributed through the tanks. Several jet sizes and configurations were tested. One-directional and two-directional jets were tested in both tanks. Mixing times for each tank were correlated with the jet Reynolds number. Mixing times were correlated for the two tank sizes using the recirculation time for the developed jet. When the recirculation times were calculated using the distance from the nozzle to the end of the tank as the length of the developed jet, the correlation was only marginally successful. Data for the two tank sizes were correlated empirically using a modified effective jet length expressed as a function of the Reynolds number raised to the 1/3 power. Mixing experiments were simulated using the TEMTEST computer program. The simulations predicted trends correctly and were within the scatter of the experimental data with the lower jet Reynolds numbers. Agreement was not as good at high Reynolds numbers except for single nozzles in the 25,000-gal tank, where agreement was excellent over the entire range

  8. Technology Successes in Hanford Tank Waste Storage and Retrieval

    International Nuclear Information System (INIS)

    Cruz, E. J.

    2002-01-01

    The U. S. Department of Energy (DOE), Office of River Protection (ORP) is leading the River Protection Project (RPP), which is responsible for dispositioning approximately 204,000 cubic meters (54 million gallons) of high-level radioactive waste that has accumulated in 177 large underground tanks at the Hanford Site since 1944. The RPP is comprised of five major elements: storage of the waste, retrieval of the waste from the tanks, treatment of the waste, disposal of treated waste, and closure of the tank facilities. Approximately 3785 cubic meters (1 million gallons) of waste have leaked from the older ''single-shell tanks.'' Sixty-seven of the 147 single shell tanks are known or assumed ''leakers.'' These leaks have resulted in contaminant plumes that extend from the tank to the groundwater in a number of tank farms. Retrieval and closure of the leaking tanks complicates the ORP technical challenge because cleanup decisions must consider the impacts of past leaks along with a strategy for retrieving the waste in the tanks. Completing the RPP mission as currently planned and with currently available technologies will take several decades and tens of billions of dollars. RPP continue to pursue the benefits from deploying technologies that reduce risk to human health and the environment, as well as, the cost of cleanup. This paper discusses some of the recent technology partnering activities with the DOE Office of Science and Technology activities in tank waste retrieval and storage

  9. Sloshing Simulation of Three Types Tank Ship on Pitching and Heaving Motion

    Directory of Open Access Journals (Sweden)

    Edi Djatmiko

    2017-06-01

    Full Text Available As an important part of a ship, tanker / cargo hold specifically designed to distribute the load to be maintained safely. In a related IMO classification of LNG carrier, there are a wide variety of types of LNG tanks on ships. Are generally divided into two types, namely tank (Independent Self Supporting Tank and (Non Self Supporting Tanks. The tank-type variation will affect the characteristics of fluid motion that is inside the tank. Need for simulation of sloshing and analysis of the structure of the tank due to the force created by the load when the heaving and pitching. Sloshing the effect of the free movement of the fluid in the tank with the striking motion wall tank walls that can damage the walls of the tank. Type 1 tank is a tank octagonal (octogonal for membrane-type LNG carrier with dimensions of length 38 m width 39.17 m 14.5 m high side of the tank. Type 2 tank is a tank-shaped capsule with the long dimension of 26.6 m and a diameter of 10.5 m. Type 3 tank is rectangular tank (rectanguler with dimensions of length of 49.68 m, width 46.92 and 32.23 m high. Simulations conducted using Computational Fluid Dynamic (CFD using ANSYS FLUENT software. From the simulation results concluded that the tank 1 to form (octogonal have a total pressure of 3013.99 Pa on the front wall with a height of 13.65 m from the base of the tank

  10. Closure Report for Corrective Action Unit 134: Aboveground Storage Tanks, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2009-01-01

    Corrective Action Unit (CAU) 134 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Aboveground Storage Tanks' and consists of the following four Corrective Action Sites (CASs), located in Areas 3, 15, and 29 of the Nevada Test Site: (1) CAS 03-01-03, Aboveground Storage Tank; (2) CAS 03-01-04, Tank; (3) CAS 15-01-05, Aboveground Storage Tank; and (4) CAS 29-01-01, Hydrocarbon Stain

  11. 78 FR 70076 - Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and...

    Science.gov (United States)

    2013-11-22

    ... Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation AGENCY: Nuclear Regulatory Commission... Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation.'' This LR... related to internal surface aging effects, fire water systems, atmospheric storage tanks, and corrosion...

  12. Melton Valley Storage Tanks Capacity Increase Project, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-04-01

    The US Department of Energy (DOE) proposes to construct and maintain additional storage capacity at Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee, for liquid low-level radioactive waste (LLLW). New capacity would be provided by a facility partitioned into six individual tank vaults containing one 100,000 gallon LLLW storage tank each. The storage tanks would be located within the existing Melton Valley Storage Tank (MVST) facility. This action would require the extension of a potable water line approximately one mile from the High Flux Isotope Reactor (HFIR) area to the proposed site to provide the necessary potable water for the facility including fire protection. Alternatives considered include no-action, cease generation, storage at other ORR storage facilities, source treatment, pretreatment, and storage at other DOE facilities

  13. The relation of collector and storage tank size in solar heating systems

    International Nuclear Information System (INIS)

    Çomaklı, Kemal; Çakır, Uğur; Kaya, Mehmet; Bakirci, Kadir

    2012-01-01

    Highlights: ► A storage tank is used in many solar water heating systems for the storage of hot water. ► Using larger storage tanks decrease the efficiency and increases the cost of the system. ► The optimum tank size for the collector area is very important for economic solar heating systems. ► The optimum sizes of the collectors and the storage tank are determined. - Abstract: The most popular method to benefit from the solar energy is to use solar water heating systems since it is one of the cheapest way to benefit from the solar energy. The investment cost of a solar water heating system is very low, and the maintenance costs are nearly zero. Using the solar energy for solar water heating (SWH) technology has been greatly improved during the past century. A storage tank is used in many solar water heating systems for the conservation of heat energy or hot water for use when some need it. In addition, domestic hot water consumption is strongly variable in many buildings. It depends on the geographical situation, also on the country customs, and of course on the type of building usage. Above all, it depends on the inhabitants’ specific lifestyle. For that reason, to provide the hot water for consumption at the desirable temperature whenever inhabitants require it, there must be a good relevance between the collectors and storage tank. In this paper, the optimum sizes of the collectors and the storage tank are determined to design more economic and efficient solar water heating systems. A program has been developed and validated with the experimental study and environmental data. The environmental data were obtained through a whole year of operation for Erzurum, Turkey.

  14. Fuel storage tanks at FAA facilities : Order 1050.15A : executive summary.

    Science.gov (United States)

    1997-04-30

    The Federal Aviation Administration (FAA) has over 4,000 fuel storage tanks (FST) in its inventory. Most of these FSTs are underground storage tanks (UST) that contain fuel for emergency backup generators providing secondary power to air navigational...

  15. Thermal stratification in storage tanks of integrated collector storage solar water heaters

    International Nuclear Information System (INIS)

    Oshchepkov, M.Y.; Frid, S.E.

    2015-01-01

    To determine the influence of the shape of the tank, the installation angle, and the magnitude of the absorbed heat flux on thermal stratification in integrated collector-storage solar water heaters, numerical simulation of thermal convection in tanks of different shapes and same volume was carried out. Idealized two-dimensional models were studied; auto model stratification profiles were obtained at the constant heat flux. The shape of the tank, the pattern of the heat flux dynamics, the adiabatic mixing on the circulation rate and the degree of stratification were shown to have significant influence. (authors)

  16. An analysis on LPG storage capability and rotation periods in Southern China; Analyse de la capacite de stockage des LPG et des frequences de rotation des navires dans le Sud de la Chine

    Energy Technology Data Exchange (ETDEWEB)

    Yuankai, L. [Shenzhen Gas Corporation Ltd (China)

    2000-07-01

    The rapidly improving infrastructure and fast growing economic strengths of cities along the Pearl River in southern China is key to the soaring LPG consumption, and also provided great potential for further development In both LPG and LNG businesses in view of a population of 70 million with a only a 40% gas coverage. The existing local pressurized storage tanks lag behind the demand, but planed and projected refrigerating storage facilities and pressurized storage tanks far exceed the future demands by the next decade. To avoid redundancy and excess density, measures has been proposed of West and East evacuation by way of rivers and reopening of railways to ship LPG from south to North regions. It is advisable to keep in mind the following points in making further investments in LPG facilities: rotation periods should be strictly observed, Full play should be brought to the local storage terminals, Economic sustainability and market saturation should be given full consideration, Complementability of LPG storage facilities and LNG receiving Terminals. (author)

  17. Experimental investigation of a molten salt thermocline storage tank

    Science.gov (United States)

    Yang, Xiaoping; Yang, Xiaoxi; Qin, Frank G. F.; Jiang, Runhua

    2016-07-01

    Thermal energy storage is considered as an important subsystem for solar thermal power stations. Investigations into thermocline storage tanks have mainly focused on numerical simulations because conducting high-temperature experiments is difficult. In this paper, an experimental study of the heat transfer characteristics of a molten salt thermocline storage tank was conducted by using high-temperature molten salt as the heat transfer fluid and ceramic particle as the filler material. This experimental study can verify the effectiveness of numerical simulation results and provide reference for engineering design. Temperature distribution and thermal storage capacity during the charging process were obtained. A temperature gradient was observed during the charging process. The temperature change tendency showed that thermocline thickness increased continuously with charging time. The slope of the thermal storage capacity decreased gradually with the increase in time. The low-cost filler material can replace the expensive molten salt to achieve thermal storage purposes and help to maintain the ideal gravity flow or piston flow of molten salt fluid.

  18. Thermodynamic Processes Involving Liquefied Natural Gas at the LNG Receiving Terminals / Procesy termodynamiczne z wykorzystaniem skroplonego gazu ziemnego w terminalach odbiorczych LNG

    Science.gov (United States)

    Łaciak, Mariusz

    2013-06-01

    The increase in demand for natural gas in the world, cause that the production of liquefied natural gas (LNG) and in consequences its regasification becoming more common process related to its transportation. Liquefied gas is transported in the tanks at a temperature of about 111K at atmospheric pressure. The process required to convert LNG from a liquid to a gas phase for further pipeline transport, allows the use of exergy of LNG to various applications, including for electricity generation. Exergy analysis is a well known technique for analyzing irreversible losses in a separate process. It allows to specify the distribution, the source and size of the irreversible losses in energy systems, and thus provide guidelines for energy efficiency. Because both the LNG regasification and liquefaction of natural gas are energy intensive, exergy analysis process is essential for designing highly efficient cryogenic installations. Wzrost zapotrzebowania na gaz ziemny na świecie powoduje, że produkcja skroplonego gazu ziemnego (LNG), a w konsekwencji jego regazyfikacja, staje się coraz bardziej powszechnym procesem związanym z jego transportem. Skroplony gaz transportowany jest w zbiornikach w temperaturze około 111K pod ciśnieniem atmosferycznym. Przebieg procesu regazyfikacji niezbędny do zamiany LNG z fazy ciekłej w gazową dla dalszego transportu w sieci, umożliwia wykorzystanie egzergii LNG do różnych zastosowań, między innymi do produkcji energii elektrycznej. Analiza egzergii jest znaną techniką analizowania nieodwracalnych strat w wydzielonym procesie. Pozwala na określenie dystrybucji, źródła i wielkości nieodwracalnych strat w systemach energetycznych, a więc ustalić wytyczne dotyczące efektywnego zużycia energii. Ponieważ zarówno regazyfikacja LNG jak i skraplanie gazu ziemnego są energochłonne, proces analizy egzergii jest niezbędny do projektowania wysoce wydajnych instalacji kriogenicznych.

  19. Leaking Underground Storage Tank Sites in Iowa

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — Leaking Underground Storage Tank (LUST) sites where petroleum contamination has been found. There may be more than one LUST site per UST site.

  20. World LNG outlook

    International Nuclear Information System (INIS)

    Maisonnier, G.

    1999-01-01

    CEDIGAZ proposes this new survey about LNG in view of the main changes which have occurred on this market during the past few years. Several projects under construction or planned three years ago are now commissioned (Qatargas) or on the verge of starting to export this year (Trinidad LNG, RasGas, Nigeria LNG) or next years (Oman LNG). The Asian crisis, which had major impacts on both short-term demand in Asia and LNG prices, has brought about new uncertainties to the long-term prospects. At the same time, it now seems more and more certain that firstly India and then China will import LNG in the next decade. It remains to be seen at what level and when this will occur. LNG growth in Europe has now become a reality, and new potential markets, for example in South America (Brazil), are also being considered as real opportunities in the near future. Considering these 'new' trends, an updated study about LNG appeared necessary. This survey 'World LNG Outlook - 99 Edition' is organised as the previous one: a historical record since 1964 (Chapter 1) followed by a description of the infrastructures existing in 1998 (Chapter 2). The analysis continues with world trade prospects by the year 2010 (Chapters 3 to 5). Chapter 6 describes the future LNG chain and the last Chapter (7) focuses on economic matters (LNG price trends, cost reductions). The study 'World LNG Outlook - 99 Edition' offers hence a comprehensive panorama of this sector from a short and long-term point of view. (author)

  1. Kitimat LNG terminal

    International Nuclear Information System (INIS)

    Schmaltz, I.; Boulton, R.

    2007-01-01

    Kitimat Liquefied Natural Gas (LNG) terminal is a terminal development company owned by Galveston LNG, a privately owned Canadian energy development company. This presentation provided information on Kitimat LNG with particular reference to its terminal located in Bish Cove on the Douglas Channel in British Columbia. This LNG terminal is reported to be the only fully permitted regasification terminal on the west coast of Canada and the United States. The presentation addressed market fundamentals including several graphs, such as world natural gas proved reserves in 2006; LNG supplements to Canadian gas supplies; global LNG demand for 2005-2020; average annual United States LNG imports; and global LNG liquefaction projects. Other market fundamentals were described, including that Kitimat is the only other approved terminal aside from the Costa Azul terminal in Mexico; Kitimat is the only west coast LNG import terminal that connects to midwest and eastern North American markets through existing gas pipelines; LNG producers are looking for destination diversification; and markets and marketers are looking for supply diversification. The authors noted that by 2010, western Canadian gas demand will exceed Californian demand. Other topics that were discussed in the presentation included Canadian natural gas field receipts; unadjusted bitumen production outlook; oil sands gas demand; forward basis fundamentals; and the commercial drivers of the Kitimat LNG terminal. The presentation also discussed the pacific trail pipelines, a partnership between Galveston LNG and Pacific Northern Gas to develop the natural gas transmission line from Kitimat to Summit. The presentation concluded with a discussion of the benefits of Kitimat LNG terminal such as providing access to the largest natural gas markets in the world via major gas transmission lines with spare capacity. figs

  2. Retail LNG handbook. Retail LNG and The Role of LNG Import Terminals. Report by the GIIGNL Technical Study Group on the possible role of LNG import terminals within the emerging Retail LNG Market

    International Nuclear Information System (INIS)

    2015-01-01

    The natural gas and liquefied natural gas (LNG) industries are changing. The influx of supply, low prices, and environmental benefits of natural gas are driving consumers to convert from other fossil fuels. Natural gas consumers on pipeline systems have the ability to benefit, but for those not connected, LNG may be the only opportunity to convert to natural gas. As this market evolves, a unique opportunity may emerge for some existing participants in the LNG market and could lead to a shift in business focus, potentially adding to or even transforming the traditional role of LNG Import Terminals. As surmised by the GIIGNL's Technical Study Group (TSG) at the outset of their endeavor, virtually every member company had historical experience with, was in the midst of expanding its services to include, or was actively engaged in the study of, Retail LNG. The market drivers, value propositions, trends and future prospects for Retail LNG that have widely been publicized were generally confirmed although in an overall more conservative outlook. As a representative body of experienced, long term LNG Import Terminal operators, GIIGNL was uniquely qualified to stress in its Handbook the importance of managing the inherent risk associated with LNG, the application of suitable codes and standards and the use of proper equipment. The study of the aspects of LNG supply and use including safety, security, staffing, equipment siting, and operations is hoped to provide an illustrative framework form which the industry can jointly move towards best practices. While Retail LNG is considered by many to be 'new' there is substantial historical experience with all aspects of the market. LNG Import Terminals, including the experience and competence of their staffing, can play a key role in not only the incubation and growth of the Retail market, but the molding and shaping of regulatory framework, applicable codes and standards and operational best practices. GIIGNL

  3. Maintaining of the demineralized water quality in storage tanks

    International Nuclear Information System (INIS)

    Hochmueller, K.; Wandelt, E.

    1981-03-01

    Two processes for maintaining the quality of the mineralized water in storage tanks are considered. A slight overpressure of nitrogen can be created above the water, or the air flowing in the tank can be cleaned by passing it through a soda-containing lime filter [fr

  4. Permanent Closure of MFC Biodiesel Underground Storage Tank 99ANL00013

    Energy Technology Data Exchange (ETDEWEB)

    Kerry L. Nisson

    2012-10-01

    This closure package documents the site assessment and permanent closure of the Materials and Fuels Complex biodiesel underground storage tank 99ANL00013 in accordance with the regulatory requirements established in 40 CFR 280.71, “Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks: Out-of-Service UST Systems and Closure.”

  5. Solar Storage Tank Insulation Influence on the Solar Systems Efficiency

    Directory of Open Access Journals (Sweden)

    Negoitescu Arina

    2012-09-01

    Full Text Available For the storage tank of a solar system for domestic hot water production was analyzed the insulation thickness and material influence. To this end, it was considered a private house, occupied by 3 persons, located in zone I of thermal radiation, for which has been simulated the domestic hot water production process. The tank outlet hot water temperature was considered of 45°C. For simulation purposes, as insulation materials for the storage tank were taking into account glass wool and polyurethane with various thicknesses. Finally, was carried out the comparative analysis of two types of tanks, in terms of the insulation thickness influence on the solar fraction, annual solar contribution and solar annual productivity. It resulted that polyurethane is the most advantageous from all points of view.

  6. Design of crude oil storage tank for acoustic emission testing

    International Nuclear Information System (INIS)

    Shukri Mohd; Masrul Nizam Salleh; Abd Razak Hamzah; Norasiah Abd Kasim

    2005-01-01

    The integrity of crude oil storage tank needs to be well managed because they can contain a large inventory of hazardous material and because of the high cost such as cleaning and waste disposal prior to disposal and maintenance. Costs involved in cleaning and inspection can be up to several hundreds thousand Malaysian Ranting. If the floor then proves to be in good condition, these costs have been wasted. Acoustic Emission (AE) is proposed to be use for monitoring the floor of the storage tank on line without doing cleaning and waste disposal. A storage tank will be fabricated for storing the crude oil and then the corrosion process will be monitor using AE method. This paper will discuss the background, material and is technical specification, design and also the difficulties faced during design and fabrication process. (Author)

  7. Underground storage tank 431-D1U1, Closure Plan

    Energy Technology Data Exchange (ETDEWEB)

    Mancieri, S.

    1993-09-01

    This document contains information about the decommissioning of Tank 431-D1U1. This tank was installed in 1965 for diesel fuel storage. This tank will remain in active usage until closure procedures begin. Soils and ground water around the tank will be sampled to check for leakage. Appendices include; proof of proper training for workers, health and safety briefing record, task hazard analysis summary, and emergency plans.

  8. Elephant's foot phenomenon in liquid storage tanks

    Energy Technology Data Exchange (ETDEWEB)

    Chen, C.Q.

    1983-01-01

    This paper presents a method for analyzing the seismic response of a flat bottomed cylindrical liquid storage tank to vertical earthquake excitation. Here, vertical earthquake acceleration is considered to correspond to an increase in the density of a stored liquid. Taking into account the vertical and horizontal earthquake loads, hydrostatic pressure, and considering restrictive moment and shear forces at shell-bottom welded joint, the author has calculated circumferential and longitudinal stresses. These are combined to more accurately approximate the stresses at the base shell course. The calculated result closely conforms to the actual damage, termed ''elephant's foot,'' observed in the fuel storage tanks damaged in the Tangshan earthquake. This result shows that the ''elephant's foot'' phenomenon is not caused by buckling of the tank shell due to longitudinal compressive stresses resulting from horizontal earthquake acceleration, but rather by the combined stresses in the base shell course of the storage tank exceeding the yield strength of the shell course material. The effect due to vertical earthquake load is more than the effect from the horizontal load. Finally, some earthquake resistant methods to prevent the ''elephant's foot'' phenomenon are suggested by the author.

  9. Modeling the release, spreading, and burning of LNG, LPG, and gasoline on water

    International Nuclear Information System (INIS)

    Johnson, David W.; Cornwell, John B.

    2007-01-01

    Current interest in the shipment of liquefied natural gas (LNG) has renewed the debate about the safety of shipping large volumes of flammable fuels. The size of a spreading pool following a release of LNG from an LNG tank ship has been the subject of numerous papers and studies dating back to the mid-1970s. Several papers have presented idealized views of how the LNG would be released and spread across a quiescent water surface. There is a considerable amount of publicly available material describing these idealized releases, but little discussion of how other flammable fuels would behave if released from similar sized ships. The purpose of this paper is to determine whether the models currently available from the United States Federal Energy Regulatory Commission (FERC) can be used to simulate the release, spreading, vaporization, and pool fire impacts for materials other than LNG, and if so, identify which material-specific parameters are required. The review of the basic equations and principles in FERC's LNG release, spreading, and burning models did not reveal a critical fault that would prevent their use in evaluating the consequences of other flammable fluid releases. With the correct physical data, the models can be used with the same level of confidence for materials such as LPG and gasoline as they are for LNG

  10. Petroleum storage tank cleaning using commercial microbial culture products

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, D.R.; Entzeroth, L.C.; Timmis, A.; Whiteside, A.; Hoskins, B.C.

    1995-12-31

    The removal of paraffinic bottom accumulations from refinery storage tanks represents an increasingly costly area of petroleum storage management. Microorganisms can be used to reduce paraffinic bottoms by increasing the solubility of bottom material and by increasing the wax-carrying capacity of carrier oil used in the cleaning process. The economic savings of such treatments are considerable. The process is also intrinsically safer than alternative methods, as it reduces and even eliminates the need for personnel to enter the tank during the cleaning process. Both laboratory and field sample analyses can be used to document changes in tank material during the treatment process. These changes include increases in volatile content and changes in wax distribution. Several case histories illustrating these physical and chemical changes are presented along with the economics of treatment.

  11. Impact analysis of a water storage tank

    International Nuclear Information System (INIS)

    Jhung, Myung Jo; Jo, Jong Chull; Jeong, Sang Jin

    2006-01-01

    This study investigates the dynamic response characteristics of a structure impacted by a high speed projectile. The impact of a 300 kg projectile on a water storage tank is simulated by the general purpose computer codes ANSYS and LS-DYNA. Several methods to simulate the impact are considered and their results are compared. Based upon this, an alternative impact analysis method that equivalent to an explicit dynamic analysis is proposed. The effect of fluid on the responses of the tank is also addressed

  12. Large underground radioactive waste storage tanks successfully cleaned at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Billingsley, K.; Burks, B.L.; Johnson, M.; Mims, C.; Powell, J.; Hoesen, D. van

    1998-05-01

    Waste retrieval operations were successfully completed in two large underground radioactive waste storage tanks in 1997. The US Department of Energy (DOE) and the Gunite Tanks Team worked cooperatively during two 10-week waste removal campaigns and removed approximately 58,300 gallons of waste from the tanks. About 100 gallons of a sludge and liquid heel remain in each of the 42,500 gallon tanks. These tanks are 25 ft. in diameter and 11 ft. deep, and are located in the North Tank Farm in the center of Oak Ridge National Laboratory. Less than 2% of the radioactive contaminants remain in the tanks, proving the effectiveness of the Radioactive Tank Cleaning System, and accomplishing the first field-scale cleaning of contaminated underground storage tanks with a robotic system in the DOE complex

  13. Underground storage tank soft waste dislodging and conveyance

    International Nuclear Information System (INIS)

    Wellner, A.F.S.

    1993-01-01

    The primary objective of this task is to demonstrate potential technical solutions and to acquire engineering data and information on the retrieval technologies applicable for use in retrieving waste from underground storage tanks. This task focuses on soft waste dislodging and conveyance technologies that would be used in conjunction with a manipulator-based retrieval system. This retrieval task focuses on Hanford single-shell tanks, but the results may also have applications to other waste retrieval problems. This work is part of the U.S. Department of Energy's (DOE's) Office of Technology Development, sponsored by the DOE's Richland Operations Office under the Underground Storage Tanks Integrated Demonstration (USTID) program. This task is one element of the whole waste dislodging and conveyance system in the USTID. The tank wastes contain both hazardous and radioactive constituents. This task focuses on the processes for dislodging and retrieving soft wastes, mainly sludge. Sludge consists primarily of heavy-metal, iron, and aluminum precipitates. Sludges vary greatly in their physical properties and may contain pockets of liquid. Sludges have been described as varying in consistency from thick slurry to sticky clay and as sandy with hard chunks of material. The waste is believed to have adhesive and cohesive properties. The quantitative physical properties of the wastes have yet to be measured. The waste simulants used in the testing program emulate the physical properties of the tank waste

  14. Integrated heat exchanger design for a cryogenic storage tank

    Energy Technology Data Exchange (ETDEWEB)

    Fesmire, J. E.; Bonner, T.; Oliveira, J. M.; Johnson, W. L.; Notardonato, W. U. [NASA Kennedy Space Center, Cryogenics Test Laboratory, NE-F6, KSC, FL 32899 (United States); Tomsik, T. M. [NASA Glenn Research Center, 21000 Brookpark Road, Cleveland, OH 44135 (United States); Conyers, H. J. [NASA Stennis Space Center, Building 3225, SSC, MS 39529 (United States)

    2014-01-29

    Field demonstrations of liquid hydrogen technology will be undertaken for the proliferation of advanced methods and applications in the use of cryofuels. Advancements in the use of cryofuels for transportation on Earth, from Earth, or in space are envisioned for automobiles, aircraft, rockets, and spacecraft. These advancements rely on practical ways of storage, transfer, and handling of liquid hydrogen. Focusing on storage, an integrated heat exchanger system has been designed for incorporation with an existing storage tank and a reverse Brayton cycle helium refrigerator of capacity 850 watts at 20 K. The storage tank is a 125,000-liter capacity horizontal cylindrical tank, with vacuum jacket and multilayer insulation, and a small 0.6-meter diameter manway opening. Addressed are the specific design challenges associated with the small opening, complete modularity, pressure systems re-certification for lower temperature and pressure service associated with hydrogen densification, and a large 8:1 length-to-diameter ratio for distribution of the cryogenic refrigeration. The approach, problem solving, and system design and analysis for integrated heat exchanger are detailed and discussed. Implications for future space launch facilities are also identified. The objective of the field demonstration will be to test various zero-loss and densified cryofuel handling concepts for future transportation applications.

  15. Technical bases for leak detection surveillance of waste storage tanks. Revision 1

    International Nuclear Information System (INIS)

    Johnson, M.G.; Badden, J.J.

    1995-01-01

    This document provides the technical bases for specification limits, monitoring frequencies and baselines used for leak detection and intrusion (for single shell tanks only) in all single and double shell radioactive waste storage tanks, waste transfer lines, and most catch tanks and receiver tanks in the waste tank farms and associated areas at Hanford

  16. DESIGN OF LIQUID-STORAGE TANK: RESULTS OF SOFTWARE MODELING VS CALCULATIONS ACCORDING TO EUROCODE

    Directory of Open Access Journals (Sweden)

    Matko Gulin

    2017-01-01

    Full Text Available The objective of this article is to show the design process of a liquid-storage tank shell according to Eurocode and compare the results obtained using the norms with those from a finite element method (FEM analysis. The calculations were performed for an aboveground vertical steel water-storage tank with a variable thickness wall and stiffening ring on top. First, the types of liquid storage tanks are briefly explained. Second, the given tank is described. Third, an analysis of the tank wall according to the Eurocode was carried out. The FEM analysis was performed using the Scia Engineer ver. 17 software. Finally, all the results are presented in tables and compared.

  17. Report of study group 3.3 ''LNG and LPG peak shaving and satellite plants''; Rapport du groupe d'etude 3.3 ''usines d'ecretement de pointes et stations satellites GNL et GPL''

    Energy Technology Data Exchange (ETDEWEB)

    Klein Nagelvoort, R.

    2000-07-01

    This report presents a world-wide overview of LNG and LPG Peak Shaving and Satellite Plants, compiled by the study group 3.3 of the International Gas Union. The scope of the work of the study group includes: - LPG peak shavers (LPG + air, N{sub 2}) in gas distribution networks; - LPG peak shavers for start-up and back-up fuel for LNG terminals and power stations; - LNG peak shavers for gas distribution networks; - Small-scale liquefaction plants for distribution to satellites and dedicated consumers (e.g. power generators, chemical plants, trucking companies etc.); - LNG peak shavers as back-up for large consumers; - Alternative liquefaction technologies for LNG and LPG (e.g. refrigeration cycles, supersonic expansion, thermo-acoustic designs); - Alternative storage tank designs for LNG and LPG. The report presents an overview of current installations world-wide and considers the prospects of technological developments with respect to equipment, remote operations and safety constraints. It also includes where possible a review of capital and operating costs, regulations, and an identification of opportunities and trends. The report collates the information available to the study group at the time of the writing, which may explain some heterogeneity in the document. (author)

  18. A new arrangement with nonlinear sidewalls for tanker ship storage panels

    Science.gov (United States)

    Ketabdari, M. J.; Saghi, H.

    2013-03-01

    Sloshing phenomenon in a moving container is a complicated free surface flow problem. It has a wide range of engineering applications, especially in tanker ships and Liquefied Natural Gas (LNG) carriers. When the tank in these vehicles is partially filled, it is essential to be able to evaluate the fluid dynamic loads on tank perimeter. Different geometric shapes such as rectangular, cylindrical, elliptical, spherical and circular conical have been suggested for ship storage tanks by previous researchers. In this paper a numerical model is developed based on incompressible and inviscid fluid motion for the liquid sloshing phenomenon. The coupled BEM-FEM is used to solve the governing equations and nonlinear free surface boundary conditions. The results are validated for rectangular container using data obtained for a horizontal periodic sway motion. Using the results of this model a new arrangement of trapezoidal shapes with quadratic sidewalls is suggested for tanker ship storage panels. The suggested geometric shape not only has a maximum surrounded tank volume to the constant available volume, but also reduces the sloshing effects more efficiently than the existing geometric shapes.

  19. Acoustic imaging of underground storage tank wastes

    International Nuclear Information System (INIS)

    Mech, S.J.

    1995-09-01

    Acoustics is a potential tool to determine the properties of high level wastes stored in Underground Storage Tanks. Some acoustic properties were successfully measured by a limited demonstration conducted in 114-TX. This accomplishment provides the basis for expanded efforts to qualify techniques which depend on the acoustic properties of tank wastes. This work is being sponsored by the Department of Energy under the Office of Science and Technology. In FY-1994, limited Tank Waste Remediation Systems EM-30 support was available at Hanford and Los Alamos National Laboratory. The Massachusetts Institute of Technology (MIT) and Earth Resources Laboratory (ERL) were engaged for analysis support, and Elohi Geophysics, Inc. for seismic testing services. Westinghouse-Hanford Company provided the testing and training, supplied the special engineering and safety analysis equipment and procedures, and provided the trained operators for the actual tank operations. On 11/9/94, limited in-tank tests were successfully conducted in tank 114-TX. This stabilized Single Shell Tank was reported as containing 16.8 feet of waste, the lower 6.28 feet of which contained interstitial liquid. Testing was conducted over the lower 12 feet, between two Liquid Observation Wells thirty feet apart. The ''quick-look'' data was reviewed on-site by MIT and Elohi

  20. Refurbishment and retrofitting of SF6 gas storage tanks of the pelletron accelerator

    International Nuclear Information System (INIS)

    Reddy, G.R.; Datar, V.M.; Parulekar, Y.M.

    2015-01-01

    The BARC-TIFR Pelletron Accelerator Facility has completed more than twenty six years of successful round-the-clock operation, serving diverse users from institutions within and outside DAE. The main accelerating structure and associated subsystems are housed in the accelerator tank under SF 6 gas medium. During maintenance of the accelerator, the SF 6 gas present in the accelerator tank is transferred in the four storage tanks located on the terrace of the building open to outside environment. These four storage tanks (with ∼ 1/4th of the main tank volume each) are ∼ 4.27 m in diameter and ∼ 10 m in height each and are supported on RCC ring beams which are monolithically connected with the RCC structure below. Over the years, the anchor bolts and the base plates of support structure of storage tanks were found corroded and the foundation RCC ring beam indicated a few corrosion cracks. Health assessment of relevant structures and components were carried out. Considering the limitations of existing anchorage and also giving due considerations for reparability and replaceability, a new anchorage system was designed. The entire refurbishment and retrofitting works pertaining to the four SF 6 gas storage tanks was executed in a time bound manner to comply with the then PASC (Particle Accelerator Safety Committee) recommendations successfully, without disrupting the operations of the round-the-clock running Pelletron Accelerator facility. In addition, the thickness measurements for the storage tanks were performed. The relief valves and rupture disc assemblies across the storage tanks were replaced and reinstalled after introducing appropriate manual valves as suggested by the PASC. A new test set up was fabricated to perform pneumatic testing at the recommended pressure off-line for these relief valves and rupture disc assemblies prior to reinstallation. This paper describes the comprehensive rehabilitation and retrofitting procedures that were carried out at the

  1. Modeling and analysis of ORNL horizontal storage tank mobilization and mixing

    International Nuclear Information System (INIS)

    Mahoney, L.A.; Terrones, G.; Eyler, L.L.

    1994-06-01

    The retrieval and treatment of radioactive sludges that are stored in tanks constitute a prevalent problem at several US Department of Energy sites. The tanks typically contain a settled sludge layer with non-Newtonian rheological characteristics covered by a layer of supernatant. The first step in retrieval is the mobilization and mixing of the supernatant and sludge in the storage tanks. Submerged jets have been proposed to achieve sludge mobilization in tanks, including the 189 m 3 (50,000 gallon) Melton Valley Storage tanks (MVST) at Oak Ridge National Laboratory (ORNL) and the planned 378 m 3 (100,000 gallon) tanks being designed as part of the MVST Capacity Increase Project (MVST-CIP). This report focuses on the modeling of mixing and mobilization in horizontal cylindrical tanks like those of the MVST design using submerged, recirculating liquid jets. The computer modeling of the mobilization and mixing processes uses the TEMPEST computational fluid dynamics program (Trend and Eyler 1992). The goals of the simulations are to determine under what conditions sludge mobilization using submerged liquid jets is feasible in tanks of this configuration, and to estimate mixing times required to approach homogeneity of the contents

  2. Design criteria tank farm storage and staging facility. Revision 1

    International Nuclear Information System (INIS)

    Lott, D.T.

    1994-01-01

    Tank Farms Operations must store/stage material and equipment until work packages are ready to work. Consumable materials are also required to be stored for routine and emergency work. Connex boxes and open storage is currently used for much of the storage because of the limited space at 272AW and 272WA. Safety issues based on poor housekeeping and material deteriorating due to weather damage has resulted from this inadequate storage space. It has been determined that a storage building in close proximity to the Tank Farm work force would be cost effective. Project W-402 and W-413 will provide a storage/staging area in 200 East and West Areas by the construction of two new storage facilities. The new facilities will be used by Operations, Maintenance and Materials groups to adequately store material and equipment. These projects will also furnish electrical services to the facilities for lighting and HVAC. Fire Protection shall be extended to the 200 East facility from 272AW if necessary

  3. Pac-Rim LNG project : final project report specifications

    International Nuclear Information System (INIS)

    1996-01-01

    PAC-RIM LNG Inc. has submitted a proposal to the British Columbia Environmental Assessment Office, to develop a liquefied natural gas project which would purchase pipeline quality natural gas from sources in northeast British Columbia and Alberta and transport it via a dedicated pipeline system to a LNG processing plant on tidewater on the Pacific coast. The project would include storage and processing facilities and a marine loading terminal. This document sets out the final project report specifications prepared by the Project Committee on the basis of input received from the public, First Nations and federal, provincial and local governments

  4. LNG; GNL

    Energy Technology Data Exchange (ETDEWEB)

    Chabrelie, M.F. [Cedigaz, 1 - 4 Avenue de Bois-Preau, 92852 Rueil Malmaison (France); Idir, N. [Commission de regulation de l' energie - CRE, 2 rue du Quatre-Septembre, 75084 Paris Cedex 02 (France); Hosanski, J.M. [Total, Dir. Gaz et Electricite, 2 place de la Coupole, La Defense 6, 92400 Courbevoie (France); Jonkman, H. [CEO, 4Gas, Max Euwelaan 21, 3062 MA Rotterdam (Netherlands); Pelloux-Prayer, D. [Gaz de France, 75 - Paris (France); Wells, D. [Shell Global LNG (United States)

    2007-07-01

    The LNG industry has entered a new step of its development, faster and more complex. The time parameter, the huge investments and the uncertainties relative to the demand growth are some of the factors that control its evolution. How the emergence of 'international price' signals will influence this activity? What supply-demand status can be foreseen from now to 2015? What role LNG would be able to play in terms of modulation management? What are the impacts of environmental constraints on LNG infrastructures? These are the different points discussed during this workshop by the five participants, specialists of the LNG questions. (J.S.)

  5. Robotic system for remote inspection of underground storage tanks

    International Nuclear Information System (INIS)

    Griebenow, B.L.; Martinson, L.M.

    1990-01-01

    Westinghouse Idaho Nuclear Company, Inc. (WINCO), operates the Idaho Chemical Processing Plant (ICPP) for the US Department of Energy (DOE). WINCO's mission is to process government owned spent nuclear fuel. The process involves dissolving the fuel and extracting off uranium. The waste from this process is temporarily stored at the ICPP in underground storage tanks. The tanks were put in service between 1953 and 1966 and are operating 10 to 15 years beyond their design life. Five of the tanks will be replaced by 1998. The integrity of the remaining six tanks must be verified to continue their use until they can be replaced at a later data. In order to verify the tank integrity, a complete corrosion analysis must be performed. This analysis will require a remote visual inspection of the tank surfaces

  6. The electrostatic properties of Fiber-Reinforced-Plastics double wall underground storage gasoline tanks

    International Nuclear Information System (INIS)

    Li, Yipeng; Liu, Quanzhen; Meng, He; Sun, Lifu; Zhang, Yunpeng

    2013-01-01

    At present Fiber Reinforced Plastics (FRP) double wall underground storage gasoline tanks are wildly used. An FRP product with a resistance of more than 10 11 Ω is a static non-conductor, so it is difficult for the static electricity in the FRP product to decay into the earth. In this paper an experimental system was built to simulate an automobile gasoline filling station. Some electrostatic parameters of the gasoline, including volume charge density, were tested when gasoline was unloaded into a FRP double wall underground storage tank. Measurements were taken to make sure the volume charge density in the oil-outlet was similar to the volume charge density in the tank. In most cases the volume charge density of the gasoline was more than 22.7 μC m −3 , which is likely to cause electrostatic discharge in FRP double wall underground storage gasoline tanks. On the other hand, it would be hard to ignite the vapor by electrostatic discharge since the vapor pressure in the tanks is over the explosion limit. But when the tank is repaired or re-used, the operators must pay attention to the static electricity and some measurements should be taken to avoid electrostatic accident. Besides the relaxation time of charge in the FRP double wall gasoline storage tanks should be longer.

  7. Soil load above Hanford waste storage tanks (2 volumes)

    International Nuclear Information System (INIS)

    Pianka, E.W.

    1995-01-01

    This document is a compilation of work performed as part of the Dome Load Control Project in 1994. Section 2 contains the calculations of the weight of the soil over the tank dome for each of the 75-feet-diameter waste-storage tanks located at the Hanford Site. The chosen soil specific weight and soil depth measured at the apex of the dome crown are the same as those used in the primary analysis that qualified the design. Section 3 provides reference dimensions for each of the tank farm sites. The reference dimensions spatially orient the tanks and provide an outer diameter for each tank. Section 4 summarizes the available soil surface elevation data. It also provides examples of the calculations performed to establish the present soil elevation estimates. The survey data and other data sources from which the elevation data has been obtained are printed separately in Volume 2 of this Supporting Document. Section 5 contains tables that provide an overall summary of the present status of dome loads. Tables summarizing the load state corresponding to the soil depth and soil specific weight for the original qualification analysis, the gravity load requalification for soil depth and soil specific weight greater than the expected actual values, and a best estimate condition of soil depth and specific weight are presented for the Double-Shell Tanks. For the Single-Shell Tanks, only the original qualification analysis is available; thus, the tabulated results are for this case only. Section 6 provides a brief overview of past analysis and testing results that given an indication of the load capacity of the waste storage tanks that corresponds to a condition approaching ultimate failure of the tank. 31 refs

  8. Computer modeling of forced mixing in waste storage tanks

    International Nuclear Information System (INIS)

    Eyler, L.L.; Michener, T.E.

    1992-01-01

    In this paper, numerical simulation results of fluid dynamic and physical process in radioactive waste storage tanks are presented. Investigations include simulation of jet mixing pump induced flows intended to mix and maintain particulate material uniformly distributed throughout the liquid volume. Physical effects of solids are included in the code. These are particle size through a settling velocity and mixture properties through density and viscosity. Calculations have been accomplished for centrally located, rotationally-oscillating, horizontally-directed jet mixing pump for two cases. One case is with low jet velocity an flow settling velocity. It results in uniform conditions. Results are being used to aid in experiment design and to understand mixing in the waste tanks. These results are to be used in conjunction with scaled experiments to define limits of pump operation to maintain uniformity of the mixture in the storage tanks during waste retrieval operations

  9. Liquefied Natural Gas Storage of Variable Composition / Magazynowanie Skroplonego Gazu Ziemnego O Zmiennym Składzie

    Science.gov (United States)

    Łaciak, Mariusz

    2015-03-01

    Thanks to the increasing diversification of LNG supply sources, being a result of the growing number of LNG liquefaction installations over the World, increase of short-term trade contracts and general trend to globally liberalize gas markets, reception terminals have to cope with the broad range of qualitatively diversified LNG deliveries from various sources. Different LNG deliveries potentially have different density caused by different gas composition. Although the LNG composition depends on LNG source, it mainly consists of methane, ethane, propane, butane and trace nitrogen. When a new supply of LNG is transported to the tank, the LNG composition and temperature in the tank can be different from LNG as delivered. This may lead to the liquid stratification in the tank, and consequently the rollover. As a result, LNG rapidly evaporates and the pressure in the tank increases. More and more restrictive safety regulations require fuller understanding of the formation and evolution of layers. The paper is focused on the analysis of liquid stratification in the tank which may take place when storing LNG, and which process leads to the rapid evaporation of considerable quantities of LNG. The aim was to attempt modeling of the process of liquid stratification in an LNG tank. The paper is closed with the results of modelling. Dzięki rosnącej dywersyfikacji źródeł dostaw LNG, spowodowanej zwiększającą się liczbą instalacji skraplania gazu na całym świecie, wzrostem ilości kontraktów krótkoterminowych w handlu i ogólnej tendencji do globalnej liberalizacja rynków gazu, terminale do odbioru muszą radzić sobie z coraz większą gamą różnych jakościowo dostaw LNG z różnych źródeł. Różne dostawy LNG mają potencjalnie inną gęstość dzięki różnym składom gazu. Chociaż kompozycja LNG zależy od źródła, to przede wszystkim składa się z metanu, etanu, propanu, butanu i w śladowych ilościach z azotu. Gdy nowa dostawa LNG jest

  10. Investigation of Stratified Thermal Storage Tank Performance for Heating and Cooling Applications

    Directory of Open Access Journals (Sweden)

    Azharul Karim

    2018-04-01

    Full Text Available A large amount of energy is consumed by heating and cooling systems to provide comfort conditions for commercial building occupants, which generally contribute to peak electricity demands. Thermal storage tanks in HVAC systems, which store heating/cooling energy in the off-peak period for use in the peak period, can be used to offset peak time energy demand. In this study, a theoretical investigation on stratified thermal storage systems is performed to determine the factors that significantly influence the thermal performance of these systems for both heating and cooling applications. Five fully-insulated storage tank geometries, using water as the storage medium, were simulated to determine the effects of water inlet velocity, tank aspect ratio and temperature difference between charging (inlet and the tank water on mixing and thermocline formation. Results indicate that thermal stratification enhances with increased temperature difference, lower inlet velocities and higher aspect ratios. It was also found that mixing increased by 303% when the temperature difference between the tank and inlet water was reduced from 80 °C to 10 °C, while decreasing the aspect ratio from 3.8 to 1.0 increased mixing by 143%. On the other hand, increasing the inlet water velocity significantly increased the storage mixing. A new theoretical relationship between the inlet water velocity and thermocline formation has been developed. It was also found that inlet flow rates can be increased, without increasing the mixing, after the formation of the thermocline.

  11. Regulatory approaches to hydrocarbon contamination from underground storage tanks

    International Nuclear Information System (INIS)

    Daugherty, S.J.

    1991-01-01

    Action or lack of action by the appropriate regulatory agency is often the most important factor in determining remedial action or closure requirements for hydrocarbon contaminated sites. This paper reports that the diversity of regulatory criteria is well known statewide and well documented nationally. In California, the diversity of approaches is due to: that very lack of a clear understanding of the true impact of hydrocarbon contamination: lack of state or federal standards for soil cleanup, and state water quality objectives that are not always achievable; vagueness in the underground storage tank law; and the number and diversity of agencies enforcing the underground storage tank regulations

  12. Design, fabrication and operating experience of Monju ex-vessel fuel storage tank

    International Nuclear Information System (INIS)

    Yokota, Yoshio; Yamagishi, Yoshiaki; Kuroha, Mitsuo; Inoue, Tatsuya

    1995-01-01

    In FBRs there are two methods of storing and cooling the spent fuel - the in-vessel storage and the ex-vessel storage. Because of the sodium leaks through the tank at the beginning of pre-operation, the utilization of the ex-vessel fuel storage tank (EVST) of some FBR plant has been changed from the ex-vessel fuel storage to the interim fuel transfer tank. This led to reactor designers focusing on the material, structure and fabrication of the carbon steel sodium storage tanks worldwide. The Monju EVST was at the final stage of the design, when the leaks occurred. The lesson learned from that experience and the domestic fabrication technology are reflected to the design and fabrication of the Monju EVST. This paper describes the design, fabrication and R and D results for the tank, and operating experience in functional test. The items to be examined are as follows: (1) Overall structure of the tank and design philosophy on the function, (2) Structure of the cover shielding plug and its design philosophy, (3) Structures of the rotating rack and its bearings, and their design philosophy, (4) Cooling method and its design philosophy, (5) Structure and fabrication of the cooling coil support inside EVST with comparison of leaked case, (6) R and D effort for items above. The fabrication of the Monju EVST started in August 1986 and it was shipped to the site in March 1990. Installation was completed in November 1990, and sodium fill after pre-heating started in 1991. The operation has been continued since September 1992. In 1996 when the first spent fuel is stored, its total functions will be examined. (author)

  13. A dispersion safety factor for LNG vapor clouds

    Energy Technology Data Exchange (ETDEWEB)

    Vílchez, Juan A. [TIPs – Trámites, Informes y Proyectos, SL, Llenguadoc 10, 08030 Barcelona (Spain); Villafañe, Diana [Centre d’Estudis del Risc Tecnològic (CERTEC), Universitat Politècnica de Catalunya, Diagonal 647, 08028 Barcelona, Catalonia (Spain); Casal, Joaquim, E-mail: joaquim.casal@upc.edu [Centre d’Estudis del Risc Tecnològic (CERTEC), Universitat Politècnica de Catalunya, Diagonal 647, 08028 Barcelona, Catalonia (Spain)

    2013-02-15

    Highlights: ► We proposed a new parameter: the dispersion safety factor (DSF). ► DSF is the ratio between the distance reached by the LFL and that reached by the visible cloud. ► The results for the DSF agree well with the evidence from large scale experiments. ► Two expressions have been proposed to calculate DSF as a function of H{sub R}. ► The DSF may help in indicating the danger of ignition of a LNG vapor cloud. -- Abstract: The growing importance of liquefied natural gas (LNG) to global energy demand has increased interest in the possible hazards associated with its storage and transportation. Concerning the event of an LNG spill, a study was performed on the relationship between the distance at which the lower flammability limit (LFL) concentration occurs and that corresponding to the visible contour of LNG vapor clouds. A parameter called the dispersion safety factor (DSF) has been defined as the ratio between these two lengths, and two expressions are proposed to estimate it. During an emergency, the DSF can be a helpful parameter to indicate the danger of cloud ignition and flash fire.

  14. A dispersion safety factor for LNG vapor clouds

    International Nuclear Information System (INIS)

    Vílchez, Juan A.; Villafañe, Diana; Casal, Joaquim

    2013-01-01

    Highlights: ► We proposed a new parameter: the dispersion safety factor (DSF). ► DSF is the ratio between the distance reached by the LFL and that reached by the visible cloud. ► The results for the DSF agree well with the evidence from large scale experiments. ► Two expressions have been proposed to calculate DSF as a function of H R . ► The DSF may help in indicating the danger of ignition of a LNG vapor cloud. -- Abstract: The growing importance of liquefied natural gas (LNG) to global energy demand has increased interest in the possible hazards associated with its storage and transportation. Concerning the event of an LNG spill, a study was performed on the relationship between the distance at which the lower flammability limit (LFL) concentration occurs and that corresponding to the visible contour of LNG vapor clouds. A parameter called the dispersion safety factor (DSF) has been defined as the ratio between these two lengths, and two expressions are proposed to estimate it. During an emergency, the DSF can be a helpful parameter to indicate the danger of cloud ignition and flash fire

  15. Reduction of LNG FOB cost

    International Nuclear Information System (INIS)

    Aoki, Ichizo; Kikkawa, Yoshitsugi

    1997-01-01

    To achieve a competitive LNG price for the consumers against other energy sources, reduction of LNG FOB (Free on Board) cost i.e. LNG cost at LNG ship flange, will be the key item. It is necessary to perform a many optimization studies (or value engineering) for each stage of the LNG project. These stages are: Feasibility study; Conceptual design - FEED (Front End Engineering and Design); EPC (Engineering, Procurement and Construction); Operation and maintenance. Since the LNG plant forms one part of the LNG chain, starting from gas production to LNG receiving, and requires several billion US dollar of investment, the consequences of a plant shut down on the LNG chain are clear, it is, therefore, important to get high availability which will also contribute the reduction of LNG FOB cost. (au) 25 refs

  16. 200 Area plateau inactive miscellaneous underground storage tanks locations

    International Nuclear Information System (INIS)

    Brevick, C.H.

    1997-01-01

    Fluor Daniel Northwest (FDNW) has been tasked by Lockheed Martin Hanford Corporation (LMHC) to incorporate current location data for 64 of the 200-Area plateau inactive miscellaneous underground storage tanks (IMUST) into the centralized mapping computer database for the Hanford facilities. The IMUST coordinate locations and tank names for the tanks currently assigned to the Hanford Site contractors are listed in Appendix A. The IMUST are inactive tanks installed in underground vaults or buried directly in the ground within the 200-East and 200-West Areas of the Hanford Site. The tanks are categorized as tanks with a capacity of less than 190,000 liters (50,000 gal). Some of the IMUST have been stabilized, pumped dry, filled with grout, or may contain an inventory or radioactive and/or hazardous materials. The IMUST have been out of service for at least 12 years

  17. Underground storage tanks: State regulations and compliance strategies

    International Nuclear Information System (INIS)

    Robinson, J.E.

    1988-01-01

    In an effort to resolve underground storage tank (UST) management problems, several states and localities have moved ahead of EPA in the promulgation of UST regulations. Developed independently, these regulations represent different strategies for ensuring compliance: from an extensive set of permitting requirements that allow for the implementation of site-specific control measures to a uniform set of technical and operational requirements that vary according to installation date. For the tank owner, complying with these regulations can be a time-consuming and frustrating endeavor. However, during the course of several environmental audits of similar facilities in different states, useful strategies were observed or developed that enabled facilities to respond more effectively to requirements: these included computerization of files, designation of tank custodians, installation of low-maintenance equipment, and increased use of above-ground tanks. Of special additional interest was the wide variation in costs for similar tank services quoted by both private and government sources. These strategies are coupled with general observations on the efficacy of the various regulatory approaches to provide a field view that may be useful to tank owners and others involved in underground tank management and evaluation

  18. Computer modeling of forced mixing in waste storage tanks

    International Nuclear Information System (INIS)

    Eyler, L.L.; Michener, T.E.

    1992-04-01

    Numerical simulation results of fluid dynamic and physical processes in radioactive waste storage tanks are presented. Investigations include simulation of jet mixing pump induced flows intended to mix and maintain particulate material uniformly distributed throughout the liquid volume. Physical effects of solids are included in the code. These are particle size through a settling velocity and mixture properties through density and viscosity. Calculations have been accomplished for a centrally located, rotationally-oscillating, horizontally-directed jet mixing pump for two cases. One case is with low jet velocity and high settling velocity. It results in nonuniform distribution. The other case is with high jet velocity and low settling velocity. It results in uniform conditions. Results are being used to aid in experiment design and to understand mixing in the waste tanks. These results are to be used in conjunction with scaled experiments to define limits of pump operation to maintain uniformity of the mixture in the storage tanks during waste retrieval operations

  19. Thermal Stratification in Small Solar Domestic Storage Tanks caused by Draw-offs

    DEFF Research Database (Denmark)

    Jordan, Ulrike; Furbo, Simon

    2005-01-01

    As shown in many research studies in the past, the thermal stratification of the tank caused by draw-offs has a high impact on the performance of a Solar Domestic Hot Water (SDHW) system. Nevertheless, in most tank models for system simulations the influence of the draw-off pattern on the mixing...... behaviour is not taken into account sufficiently. Two typical Danish domestic water storage tanks, each with a volume of about 150 l, were investigated. In both tanks the inlet pipes are placed at the bottom and hot water is drawn from the upper part of tank. Above the inlet pipes, differently shaped plates...... are placed in order to reduce the mixing of the incoming cold water with the warmer storage water. To measure the thermal stratification thermocouples were placed in a vertical glass tube inside the tank. Measurements were carried out with different draw-off volumes, flow rates, and initial temperatures...

  20. Analysis on engineering application of CNP1000 in-containment refueling water storage tank

    International Nuclear Information System (INIS)

    Wang Bin; Wang Yong; Qiu Jian; Weng Minghui

    2005-01-01

    Based on the basic design of CNP1000 (three loops), which is self-reliance designed by China National Nuclear Cooperation, and investigation results from abroad advanced nuclear power plant design of In-containment Refueling Water Storage tank, this paper describe the system flowsheet, functional requirements, structural design and piping arrangement about In-containment Refueling Water Storage Tank. The design takes the lower structural space as the IRWST. Four areas are configured to meet the diverse functional requirements, including depressurization area, water collection area, safety injection and/or containment spray suction area, TSP storage area / reactor cavity flooding holdup tank. Also the paper depict the corresponding analysis and demonstration, such as In-containment Refueling Water Storage Tank pressure transient on depressurization area of IRWST, suction and internal flow stream of IRWST, configuration of strains, the addition method and amount of chemical addition, design and engineering applicant of Reactor Cavity Flooding System. All the analysis results show the basic design of IRWST meeting with the Utility Requirement Document's requirements on performance of safety function, setting of overfill passage, overpressure protection, related interference, etc., and show the reliability of Engineering Safety Features being improved for CNP1000 (three loops). Meanwhile, it is demonstrated that the design of In-containment Refueling Water Storage Tank can apply on the future nuclear power plant project in China. (authors)

  1. Environmental Protection: Improved Inspections and Enforcement Would Ensure Safer Underground Storage Tanks

    National Research Council Canada - National Science Library

    Stephenson, John

    2001-01-01

    ...) Underground Storage Tank (UST) program. 1 The program is relevant to today's hearing because studies have shown that tanks that leak hazardous substances, such as methyl tertiary butyl ether (MTBE...

  2. Short-term LNG-markets

    International Nuclear Information System (INIS)

    Eldegard, Tom; Lund, Arne-Christian; Miltersen, Kristian; Rud, Linda

    2005-01-01

    The global Liquefied Natural Gas (LNG) industry has experienced substantial growth in the past decades. In the traditional trade patterns of LNG the product has typically been handled within a dedicated chain of plants and vessels fully committed by long term contracts or common ownership, providing risk sharing of large investments in a non-liquid market. Increasing gas prices and substantial cost reductions in all parts of the LNG chain have made LNG projects viable even if only part of the capacity is secured by long-term contracts, opening for more flexible trade of the remainder. Increasing gas demand, especially in power generation, combined with cost reductions in the cost of LNG terminals, open new markets for LNG. For the LNG supplier, the flexibility of shifting volumes between regions represents an additional value. International trade in LNG has been increasing, now accounting for more than one fifth of the world's cross-border gas trade. Despite traditional vertical chain bonds, increased flexibility has contributed in fact to an increasing LNG spot trade, representing 8% of global trade in 2002. The focus of this paper is on the development of global short-term LNG markets, and their role with respect to efficiency and security of supply in European gas markets. Arbitrage opportunities arising from price differences between regional markets (such as North America versus Europe) are important impetuses for flexible short-term trade. However, the short-term LNG trade may suffer from problems related to market access, e.g. limited access to terminals and regulatory issues, as well as rigidities connected to vertical binding within the LNG chain. Important issues related to the role of short-term LNG-trade in the European gas market are: Competition, flexibility in meeting peak demand, security of supply and consequences of differences in pricing policies (oil-linked prices in Europe and spot market prices in North America). (Author)

  3. Status of containment integrity studies for continued in-tank storage of Hanford defense high-level waste

    International Nuclear Information System (INIS)

    Baca, R.G.; Beitel, G.A.; Mercier, P.F.; Moore, E.L.; Vollert, F.R.

    1978-09-01

    Information is provided on the technical studies that have been implemented for evaluating the containment integrity of the single-shell waste storage tanks. The major areas of study are an analysis of storage tank integrity, a failure mode analysis, and storage tank improvements. Evaluations of tank structural integrity include theoretical studies on static and dynamic load responses, laboratory studies on concrete durability, and experimental studies on the potential for exothermic reactions of salt cake. The structural analyses completed to date show that the tanks are in good condition and have a safety margin against overload. Environmental conditions that could cause a loss of durability are limited to the waste chemicals stored (which do not have access to the concrete). Concern that a salt cake exothermic reaction may initiate a loss of containment is not justifiable based on extensive testing completed. A failure mode analysis of a tank liner failure, a sidewall failure, and a dome collapse shows that no radiologic hazard to man results. Storage tank improvement studies completed show that support of a tank dome is achievable. Secondary containment provided by chemical grouts and bentonite clay slurry walls does not appear promising. It is now estimated that the single-shell tanks will be serviceable for the storage of salt cake waste for decades under currently established operating temperature and load limits

  4. Modeling of storage tank settlement based on the United States standards

    Directory of Open Access Journals (Sweden)

    Gruchenkova Alesya

    2018-01-01

    Full Text Available Up to 60% of storage tanks in operation have uneven settlement of the outer bottom contour, which often leads to accidents. Russian and foreign regulatory documents have different requirements for strain limits of metal structures. There is an increasing need for harmonizing regulatory documents. The aim of this study is to theoretically justify and to assess the possibility of applying the U.S. standards for specifying the allowable settlement of storage tanks used in Russia. The allowable uneven settlement was calculated for a vertical steel tank (VST-20000 according to API-653, a standard of the American Petroleum Institute. The calculated allowable settlement levels were compared with those established by Russian standards. Based on the finite element method, the uneven settlement development process of a storage tank was modeled. Stress-strain state parameters of tank structures were obtained at the critical levels established in API-653. Relationships of maximum equivalent stresses in VST metal structures to the vertical settlement component for settlement zones of 6 to 72 m in length were determined. When the uneven settlement zone is 6 m in length, the limit state is found to be caused by 30-mm vertical settlement, while stresses in the wall exceed 330 MPa. When the uneven settlement zone is 36 m in length, stresses reach the yield point only at 100-mm vertical settlement.

  5. Hanford Tank Farm interim storage phase probabilistic risk assessment outline

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-19

    This report is the second in a series examining the risks for the high level waste (HLW) storage facilities at the Hanford Site. The first phase of the HTF PSA effort addressed risks from Tank 101-SY, only. Tank 101-SY was selected as the initial focus of the PSA because of its propensity to periodically release (burp) a mixture of flammable and toxic gases. This report expands the evaluation of Tank 101-SY to all 177 storage tanks. The 177 tanks are arranged into 18 farms and contain the HLW accumulated over 50 years of weapons material production work. A centerpiece of the remediation activity is the effort toward developing a permanent method for disposing of the HLW tank`s highly radioactive contents. One approach to risk based prioritization is to perform a PSA for the whole HLW tank farm complex to identify the highest risk tanks so that remediation planners and managers will have a more rational basis for allocating limited funds to the more critical areas. Section 3 presents the qualitative identification of generic initiators that could threaten to produce releases from one or more tanks. In section 4 a detailed accident sequence model is developed for each initiating event group. Section 5 defines the release categories to which the scenarios are assigned in the accident sequence model and presents analyses of the airborne and liquid source terms resulting from different release scenarios. The conditional consequences measured by worker or public exposure to radionuclides or hazardous chemicals and economic costs of cleanup and repair are analyzed in section 6. The results from all the previous sections are integrated to produce unconditional risk curves in frequency of exceedance format.

  6. Acoustic Profiling of Bottom Sediments in Large Oil Storage Tanks

    Science.gov (United States)

    Svet, V. D.; Tsysar', S. A.

    2018-01-01

    Characteristic features of acoustic profiling of bottom sediments in large oil storage tanks are considered. Basic acoustic parameters of crude oil and bottom sediments are presented. It is shown that, because of the presence of both transition layers in crude oil and strong reverberation effects in oil tanks, the volume of bottom sediments that is calculated from an acoustic surface image is generally overestimated. To reduce the error, additional post-processing of acoustic profilometry data is proposed in combination with additional measurements of viscosity and tank density distributions in vertical at several points of the tank.

  7. Anti-seismic analysis for air storage tank used in the nuclear power plant

    International Nuclear Information System (INIS)

    Hua Jun; Ren Xin; Feng Ping

    2011-01-01

    This text calculates and analyses the structure of the air storage tank used for the SBO diesel generator set of Taishan nuclear power plant through finite element method, and simply introduces the mechanical modeling, loading condition and seismic response spectrum analyzing method for the structure, then get the natural frequency, vibration mode and response under seismic load of the structure through calculation. Evaluate the stress under the combined load such as gravity, internal stress, earthquake of the structure according to RCCM. The result shows that the structure intensity of the air storage tank meets the requirements of the specification. The calculating result gives the accordance for the seismic design of the air storage tank. (authors)

  8. Regulated underground storage tanks

    International Nuclear Information System (INIS)

    1992-06-01

    This guidance package is designed to assist DOE Field operations by providing thorough guidance on the underground storage tank (UST) regulations. [40 CFR 280]. The guidance uses tables, flowcharts, and checklists to provide a ''roadmap'' for DOE staff who are responsible for supervising UST operations. This package is tailored to address the issues facing DOE facilities. DOE staff should use this guidance as: An overview of the regulations for UST installation and operation; a comprehensive step-by-step guidance for the process of owning and operating an UST, from installation to closure; and a quick, ready-reference guide for any specific topic concerning UST ownership or operation

  9. New developments in LNG trade

    International Nuclear Information System (INIS)

    Frisch, Morten

    2000-01-01

    This paper presents an overview of international trade in liquefied natural gas. Factors and forces causing changes in the international LNG market are explored covering Japan and South East Asian markets, the rapidly growing Spanish and Italian markets, competition faced by LNG imports by pipeline gas in France and Belgium, the reopening of mothballed LNG receiving facilities in the US east coast, and markets with large LNG potential in India, China and South America. Developments in the price of LNG in Japan, Europe, and the US east coast are considered, and shipping issues, and future trends in LNG purchase arrangements and LNG pricing are discussed

  10. Accident scenarios triggered by lightning strike on atmospheric storage tanks

    International Nuclear Information System (INIS)

    Necci, Amos; Argenti, Francesca; Landucci, Gabriele; Cozzani, Valerio

    2014-01-01

    Severe Natech accidents may be triggered by lightning strike affecting storage tanks containing relevant inventories of hazardous materials. The present study focused on the identification of event sequences and accident scenarios following lightning impact on atmospheric tanks. Reference event trees, validated using past accident analysis, are provided to describe the specific accident chains identified, accounting for reference protection and mitigation safety barriers usually adopted in current industrial practice. An overall methodology was outlined to allow the calculation of the expected frequencies of final scenarios following lightning impact on atmospheric storage tanks, taking into account the expected performance of available safety barriers. The methodology was applied to a case study in order to better understand the data that may be obtained and their importance in the framework of quantitative risk assessment (QRA) and of the risk management of industrial facilities with respect to external hazards due to natural events. - Highlights: • Event sequences following lightning impact on atmospheric tanks were identified. • Reference event trees including standard safety barriers were obtained. • Safety barriers applied in industrial practice were assessed to quantify event trees. • Frequencies of final scenarios following lightning impact on tanks were calculated. • Natech scenarios caused by lightning have an important influence on risk profiles

  11. Operation Performance of Central Solar Heating System with Seasonal Storage Water Tank in Harbin

    Institute of Scientific and Technical Information of China (English)

    YE Ling; JIANG Yi-qiang; YAO Yang; ZHANG Shi-cong

    2009-01-01

    This paper presented a preliminary research on the central solar heating system with seasonal stor-age(CSHSSS)used in cold climate in China.A mathematical model of the solar energy seasonal storage water tank used in the central solar heating system was firstly developed based on energy conservation.This was fol-lowed by the simulation of the CSHSSS used in a two-floor villa in Harbin,and analysis of the impacts on storage water temperature of tank volume,solar collector area,tank burial depth,insulation thickness around the tank,etc.The results show there is a relatively economical tank volume to optimize the system efficiency,which de-creases with increasing tank volume at the constant collector area,and increases with increasing collector area at the constant tank volume.Furthermore,the insulation thickness has obvious effect on avoiding heat loss,while the tank burial depth doesn't.In addition-the relationship between the solar collector efficiency and storage wa-ter temperature is also obtained,it decreases quickly with increasing storing water temperature,and then in-creases slowly after starting space heating system.These may be helpful for relevant design and optimization in cold climates in China and all over the world.

  12. LNG Safety Assessment Evaluation Methods

    Energy Technology Data Exchange (ETDEWEB)

    Muna, Alice Baca [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); LaFleur, Angela Christine [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-05-01

    Sandia National Laboratories evaluated published safety assessment methods across a variety of industries including Liquefied Natural Gas (LNG), hydrogen, land and marine transportation, as well as the US Department of Defense (DOD). All the methods were evaluated for their potential applicability for use in the LNG railroad application. After reviewing the documents included in this report, as well as others not included because of repetition, the Department of Energy (DOE) Hydrogen Safety Plan Checklist is most suitable to be adapted to the LNG railroad application. This report was developed to survey industries related to rail transportation for methodologies and tools that can be used by the FRA to review and evaluate safety assessments submitted by the railroad industry as a part of their implementation plans for liquefied or compressed natural gas storage ( on-board or tender) and engine fueling delivery systems. The main sections of this report provide an overview of various methods found during this survey. In most cases, the reference document is quoted directly. The final section provides discussion and a recommendation for the most appropriate methodology that will allow efficient and consistent evaluations to be made. The DOE Hydrogen Safety Plan Checklist was then revised to adapt it as a methodology for the Federal Railroad Administration’s use in evaluating safety plans submitted by the railroad industry.

  13. Hanford Tank Farm interim storage phase probabilistic risk assessment outline

    International Nuclear Information System (INIS)

    1994-01-01

    This report is the second in a series examining the risks for the high level waste (HLW) storage facilities at the Hanford Site. The first phase of the HTF PSA effort addressed risks from Tank 101-SY, only. Tank 101-SY was selected as the initial focus of the PSA because of its propensity to periodically release (burp) a mixture of flammable and toxic gases. This report expands the evaluation of Tank 101-SY to all 177 storage tanks. The 177 tanks are arranged into 18 farms and contain the HLW accumulated over 50 years of weapons material production work. A centerpiece of the remediation activity is the effort toward developing a permanent method for disposing of the HLW tank's highly radioactive contents. One approach to risk based prioritization is to perform a PSA for the whole HLW tank farm complex to identify the highest risk tanks so that remediation planners and managers will have a more rational basis for allocating limited funds to the more critical areas. Section 3 presents the qualitative identification of generic initiators that could threaten to produce releases from one or more tanks. In section 4 a detailed accident sequence model is developed for each initiating event group. Section 5 defines the release categories to which the scenarios are assigned in the accident sequence model and presents analyses of the airborne and liquid source terms resulting from different release scenarios. The conditional consequences measured by worker or public exposure to radionuclides or hazardous chemicals and economic costs of cleanup and repair are analyzed in section 6. The results from all the previous sections are integrated to produce unconditional risk curves in frequency of exceedance format

  14. An Underground Storage Tank Integrated Demonstration report

    International Nuclear Information System (INIS)

    Quadrel, M.J.; Hunter, V.L.; Young, J.K.; Lini, D.C.; Goldberg, C.

    1993-04-01

    The Waste Characterization Data and Technology Development Needs Assessment provides direct support to the Underground Storage Tank Integrated Demonstration (UST-ID). Key users of the study's products may also include individuals and programs within the US Department of Energy (DOE) Office of Technology Development (EM-50), the Office of Waste Operations (EM-30), and the Office of Environmental Restoration (EM-40). The goal of this work is to provide the UST-ID with a procedure for allocating funds across competing characterization technologies in a timely and defensible manner. It resulted in three primary products: 1. It organizes and summarizes information on underground storage tank characterization data needs. 2. It describes current technology development activity related to each need and flags areas where technology development may be beneficial. 3. It presents a decision process, with supporting software, for evaluating, prioritizing, and integrating possible technology development funding packages. The data presented in this document can be readily updated as the needs of the Waste Operations and Environmental Restoration programs mature and as new and promising technology development options emerge

  15. Small-Scale Metal Tanks for High Pressure Storage of Fluids

    Science.gov (United States)

    London, Adam (Inventor)

    2016-01-01

    Small scale metal tanks for high-pressure storage of fluids having tank factors of more than 5000 meters and volumes of ten cubic inches or less featuring arrays of interconnected internal chambers having at least inner walls thinner than gage limitations allow. The chambers may be arranged as multiple internal independent vessels. Walls of chambers that are also portions of external tank walls may be arcuate on the internal and/or external surfaces, including domed. The tanks may be shaped adaptively and/or conformally to an application, including, for example, having one or more flat outer walls and/or having an annular shape. The tanks may have dual-purpose inlet/outlet conduits of may have separate inlet and outlet conduits. The tanks are made by fusion bonding etched metal foil layers patterned from slices of a CAD model of the tank. The fusion bonded foil stack may be further machined.

  16. Advantages using inlet stratification devices in solar domestic hot water storage tanks

    DEFF Research Database (Denmark)

    Dragsted, Janne; Furbo, Simon; Bava, Federico

    2017-01-01

    performances of two solar domestic hot water systems are presented. One system is a traditional high flow system with a heat exchanger spiral in the tank. The other system is a low flow system with an external heat exchanger and a newly developed inlet stratifier from EyeCular Technologies ApS installed......The thermal performance of a domestic hot water system is strongly affected by whether the storage tank is stratified or not. Thermal stratification can be built up in a solar storage tank if the heated water from the solar collectors enters the tank through an inlet stratifier.Measured thermal...... with the stratification device has a higher thermal performance compared to the system with the heat exchanger spiral inside the tank.The relative performance (defined as the ratio between the net utilized solar energy of the low flow system and the net utilized solar energy of the high flow system), is a function...

  17. Estimating Residual Solids Volume In Underground Storage Tanks

    International Nuclear Information System (INIS)

    Clark, Jason L.; Worthy, S. Jason; Martin, Bruce A.; Tihey, John R.

    2014-01-01

    The Savannah River Site liquid waste system consists of multiple facilities to safely receive and store legacy radioactive waste, treat, and permanently dispose waste. The large underground storage tanks and associated equipment, known as the 'tank farms', include a complex interconnected transfer system which includes underground transfer pipelines and ancillary equipment to direct the flow of waste. The waste in the tanks is present in three forms: supernatant, sludge, and salt. The supernatant is a multi-component aqueous mixture, while sludge is a gel-like substance which consists of insoluble solids and entrapped supernatant. The waste from these tanks is retrieved and treated as sludge or salt. The high level (radioactive) fraction of the waste is vitrified into a glass waste form, while the low-level waste is immobilized in a cementitious grout waste form called saltstone. Once the waste is retrieved and processed, the tanks are closed via removing the bulk of the waste, chemical cleaning, heel removal, stabilizing remaining residuals with tailored grout formulations and severing/sealing external penetrations. The comprehensive liquid waste disposition system, currently managed by Savannah River Remediation, consists of 1) safe storage and retrieval of the waste as it is prepared for permanent disposition; (2) definition of the waste processing techniques utilized to separate the high-level waste fraction/low-level waste fraction; (3) disposition of LLW in saltstone; (4) disposition of the HLW in glass; and (5) closure state of the facilities, including tanks. This paper focuses on determining the effectiveness of waste removal campaigns through monitoring the volume of residual solids in the waste tanks. Volume estimates of the residual solids are performed by creating a map of the residual solids on the waste tank bottom using video and still digital images. The map is then used to calculate the volume of solids remaining in the waste tank. The ability to

  18. LNG TERMINAL SAFE OPERATION MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Andrzej ADAMKIEWICZ

    2012-07-01

    Full Text Available This article presents the significance of LNG terminal safety issues in natural gas sea transport. It shows particular requirements for LNG transmission installations resulting from the specific properties of LNG. Out of the multi‐layer critical safety areas comprising structural elements of the terminal safety system, possibilities to decrease the risk of emergency occurrence on LNG terminals have been selected. Tasks performed by the LNG terminal, together with its own personnel and the outside one, have been defined. General theses for LNG terminal safety have been formulated.

  19. Performance of liquid storage tanks during the 1989 Loma Prieta earthquake

    International Nuclear Information System (INIS)

    Haroun, M.A.; Mourad, S.A.; Izzeddine, W.

    1991-01-01

    Utilities and industrial facilities in the strong shaking area of the 1989 Loma Prieta earthquake include a large inventory of tanks of all types. The earthquake induced a few incidents of damage to tanks of old and modern design, and even to a retrofitted tank. This paper documents the performance of tank structures during this seismic event through a detailed description of the damage sustained by ground-based petroleum and water storage tanks and by elevated water tanks. It appears that site amplification of the long period ground motion components was a cause of large amplitude sloshing and the associated damage to tanks built on Bay Mud. It is also apparent that design procedures for ground-based unanchored tanks require a substantial updating to reflect the recent technical advances and the lessons learned for such a type of tanks

  20. Reducing drinking water supply chemical contamination: risks from underground storage tanks.

    Science.gov (United States)

    Enander, Richard T; Hanumara, R Choudary; Kobayashi, Hisanori; Gagnon, Ronald N; Park, Eugene; Vallot, Christopher; Genovesi, Richard

    2012-12-01

    Drinking water supplies are at risk of contamination from a variety of physical, chemical, and biological sources. Ranked among these threats are hazardous material releases from leaking or improperly managed underground storage tanks located at municipal, commercial, and industrial facilities. To reduce human health and environmental risks associated with the subsurface storage of hazardous materials, government agencies have taken a variety of legislative and regulatory actions--which date back more than 25 years and include the establishment of rigorous equipment/technology/operational requirements and facility-by-facility inspection and enforcement programs. Given a history of more than 470,000 underground storage tank releases nationwide, the U.S. Environmental Protection Agency continues to report that 7,300 new leaks were found in federal fiscal year 2008, while nearly 103,000 old leaks remain to be cleaned up. In this article, we report on an alternate evidence-based intervention approach for reducing potential releases from the storage of petroleum products (gasoline, diesel, kerosene, heating/fuel oil, and waste oil) in underground tanks at commercial facilities located in Rhode Island. The objective of this study was to evaluate whether a new regulatory model can be used as a cost-effective alternative to traditional facility-by-facility inspection and enforcement programs for underground storage tanks. We conclude that the alternative model, using an emphasis on technical assistance tools, can produce measurable improvements in compliance performance, is a cost-effective adjunct to traditional facility-by-facility inspection and enforcement programs, and has the potential to allow regulatory agencies to decrease their frequency of inspections among low risk facilities without sacrificing compliance performance or increasing public health risks. © 2012 Society for Risk Analysis.

  1. Thermal performance behavior of a domestic hot water solar storage tank during consumption operation

    International Nuclear Information System (INIS)

    Dehghan, A.A.; Barzegar, A.

    2011-01-01

    Transient thermal performance behavior of a vertical storage tank of a domestic solar water heating system with a mantle heat exchanger has been investigated numerically in the discharge/consumption mode. It is assumed that the tank is initially stratified during its previous heat storing/charging operation. During the discharging period, the city cold water is fed at the bottom of the tank and hot water is extracted from its top outlet port for consumption. Meanwhile, the collector loop is assumed to be active. The conservation equations in the axis-symmetric cylindrical co-ordinate have been used and discretised by employing the finite volume method. The low Reynolds number (LRN) k - ω model is utilized for treating turbulence in the fluid. The influence of the tank Grashof number, the incoming cold fluid Reynolds number and the size of the inlet port of the heat storage tank on the transient thermal characteristics of the tank is investigated and discussed. It is found that for higher values of Grashof number, the pre-established thermal stratification is well preserved during the discharging operation mode. It is also noticed that in order to have a tank with a proper thermal performance and or have least mixing inside the tank during the consumption period, the tank inflow Reynolds number and or its inflow port diameter should be kept below certain values. In these cases, the storage tank is enabling to provide proper amount of hot water with a proper temperature for consumption purposes.

  2. Basic and acidic leaching of Melton Valley Storage Tank sludge at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Collins, J.L.; Egan, B.Z.; Beahm, E.C.

    1995-01-01

    Basic and acidic leaching tests were conducted with samples of sludge taken from an underground storage tank at the US Department of Energy Melton Valley Storage Tank facility at Oak Ridge National Laboratory. The tests evaluated separation technologies for use in sludge processing to concentrate the radionuclides and reduce the volumes of storage tank waste for final disposal. Study results of sludge characterization, caustic leaching of sludge samples at ambient temperature and at 95 degrees C, and acid leaching of sludge samples at ambient temperature are reported in detail

  3. LNG project - contractual aspects

    Energy Technology Data Exchange (ETDEWEB)

    Goncalves, Bruno Almeida

    2008-07-01

    This paper intends to provide from the legal point of view an outline of the main challenges of a LNG project in the upstream, regulatory aspects, liquefaction, financing and midstream through a basic checklist; an overview of the contractual complexity of a LNG project; some basic discussion of particular LNG contract clauses; and a comparative analysis between the classic clauses of a Gas Transportation Agreement (GTA) through a gas pipeline and LNG logistic. (author)

  4. The LNG Industry - 2014

    International Nuclear Information System (INIS)

    Dispenza, Domenico

    2015-04-01

    In the main, the global LNG industry can look back on 2014 as another year of relative stagnation with LNG trade reaching 239.2 MMT, a 1% increase over 2013, but just below 2011 levels. Although one new liquefaction plant came on stream in May in Papua New Guinea and one expansion train started producing in Algeria, disappointments in Angola and Egypt and slowdown in Qatar limited the volume of additional LNG supply. Low demand in South Korea as well as slower than expected growth in China contributed to loosen the market tightness observed in recent years, foreboding the return of a buyers' market as the year progressed. Other highlights in the past year's review of LNG imports are the remarkable gain in India, ahead of the U.K and Japan's demand increase, and the arrival of Lithuania as the world's 30. importer with a floating storage and re-gasification unit (FSRU). On the supply side, Queensland Curtis was on the brink at year-end of joining the producers' rank and managed to load its first cargo in December. Nigeria showed the second largest addition of supply (after PNG) attributable to a much improved feed-gas supply. During the second half of the year a sharp decrease in crude oil prices combined with a looser supply situation in the Pacific drove down prices in Asia, where spot prices were halved between March and October of last year. On the supply side, this price drop in Asia will inevitably slow down or defer development of expensive new supply projects. On the demand side, it has begun to translate into the return of flexible LNG cargoes to Europe, where spot prices have been disconnected from oil prices for some time. In this context of demand and price uncertainty, traditional procurement models are changing, as new players with different business models emerge, new procurement alliances are being formed and new commercial offerings are being structured; all mainly in the pursuit of enhanced flexibility both in terms of

  5. Application of mass-spring model in seismic analysis of liquid storage tank

    International Nuclear Information System (INIS)

    Liu Jiayi; Bai Xinran; Li Xiaoxuan

    2013-01-01

    There are many tanks for storing liquid in nuclear power plant. When seismic analysis is performed, swaying of liquid may change the mechanical parameters of those tanks, such as the center of mass and the moment of inertia, etc., so the load due to swaying of liquid can't be neglected. Mass-spring model is a simplified model to calculate the dynamic pressure of liquid in tank under earthquake, which is derived by the theory of Housner and given in the specification of seismic analysis of Safety-Related Nuclear Structures and Commentary-4-98 (ASCE-4-98 for short hereinafter). According to the theory of Housner and ASCE-4-98, the mass-spring 3-D FEM model for storage tank and liquid in it was established, by which the force of stored liquid acted on liquid storage tank in nuclear power plant under horizontal seismic load was calculated. The calculated frequency of liquid swaying and effect of liquid convection on storage tank were compared with those calculated by simplified formula. It is shown that the results of 3-D FEM model are reasonable and reliable. Further more, it is more direct and convenient compared with description in ASCE-4-98 when the mass-spring model is applied to 3-D FEM model for seismic analysis, from which the displacement and stress distributions of the plate-shell elements or the 3-D solid finite elements can be obtained directly from the seismic input model. (authors)

  6. Effect of Heat Treatment Process on Mechanical Properties and Microstructure of a 9% Ni Steel for Large LNG Storage Tanks

    Science.gov (United States)

    Zhang, J. M.; Li, H.; Yang, F.; Chi, Q.; Ji, L. K.; Feng, Y. R.

    2013-12-01

    In this paper, two different heat treatment processes of a 9% Ni steel for large liquefied natural gas storage tanks were performed in an industrial heating furnace. The former was a special heat treatment process consisting of quenching and intercritical quenching and tempering (Q-IQ-T). The latter was a heat treatment process only consisting of quenching and tempering. Mechanical properties were measured by tensile testing and charpy impact testing, and the microstructure was analyzed by optical microscopy, transmission electron microscopy, and x-ray diffraction. The results showed that outstanding mechanical properties were obtained from the Q-IQ-T process in comparison with the Q-T process, and a cryogenic toughness with charpy impact energy value of 201 J was achieved at 77 K. Microstructure analysis revealed that samples of the Q-IQ-T process had about 9.8% of austenite in needle-like martensite, while samples of the Q-T process only had about 0.9% of austenite retained in tempered martensite.

  7. Analysis of constraints to the introduction of LNG plants in the Brazilian electric sector; Analise dos condicionantes para a introducao de plantas a GNL no setor eletrico brasileiro

    Energy Technology Data Exchange (ETDEWEB)

    Cortes, Tatiane Moraes Pestana

    2010-03-15

    This work aims analyze the constraints to the introduction of LNG in the Brazilian energy matrix. Therefore, considers the current regulatory framework and the investments recently made by PETROBRAS to acquire LNG in the international market in order to supply power plants in the country. In order to assess the current status of the LNG plants in the electricity sector, factors are analyzed in terms of the natural gas industry and electric power industry, such as: storage, LNG contracts, operating dispatch, LNG plants pricing and operational flexibility. Despite the increase in LNG international trade and the prospect of using this product in Brazil, there are some challenges for the effective use of LNG plants by Brazilian electric sector. Some of the challenges are the need to review the methodology of calculating the cost benefit of LNG power plants. Another important challenge is to examine the use of underground storage and its influence in the operating dispatch of LNG plants. (author)

  8. LNG TERMINAL SAFE OPERATION MANAGEMENT

    OpenAIRE

    Andrzej ADAMKIEWICZ; Włodzimierz KAMIŃSKI

    2012-01-01

    This article presents the significance of LNG terminal safety issues in natural gas sea transport. It shows particular requirements for LNG transmission installations resulting from the specific properties of LNG. Out of the multi‐layer critical safety areas comprising structural elements of the terminal safety system, possibilities to decrease the risk of emergency occurrence on LNG terminals have been selected. Tasks performed by the LNG terminal, together with its own personnel and the out...

  9. Experimental study and modelization of a propane storage tank depressurization

    International Nuclear Information System (INIS)

    Veneau, Tania

    1995-01-01

    The risks associated with the fast depressurization of propane storage tanks reveals the importance of the 'source term' determination. This term is directly linked, among others, to the characteristics of the jet developed downstream of the breach. The first aim of this work was to provide an original data bank concerning drop velocity and diameter distributions in a propane jet. For this purpose, a phase Doppler anemometer bas been implemented on an experimental set-up. Propane blowdowns have been performed with different breach sizes and several initial pressures in the storage tank. Drop diameter and velocity distributions have been investigated at different locations in the jet zone. These measurements exhibited the fragmentation and vaporisation trends in the jet. The second aim of this work concerned the 'source term'. lt required to study the coupling between the fluid behaviour inside the tank and the flow through the breach. This model took into account the phase exchange when flashing occurred in the tank. The flow at the breach was described with an homogeneous relaxation model. This coupled modelization has been successfully and exhaustively validated. lt originality lies on the application to propane flows. (author) [fr

  10. The LNG Industry - 2008

    International Nuclear Information System (INIS)

    2009-04-01

    Estimates for the marketed production of natural gas in 2008 show a rise of about 3.4% over 2007. The share of LNG in the gas trade accounts for 27% of the total (excluding trade within the Former Soviet Union and United Arab Emirates). This annual report presents: 1 - LNG contracts and trade, 2 - Contracts concluded in 2008, 3 - LNG imports - Sources of imports - Quantities received in 2008, 4 - LNG tankers, 5 - Ships delivered, 6 - Tanker distribution, 7 - Liquefaction plants, 8 - re-gasification plants, 9 - Contracts in force in 2008, 10 - Spot and short term quantities received in 2008, 11 - Sea transportation routes, 12 - Liquefaction plants (table), 13 - re-gasification plants (table), 14 - Delivery date of the LNG tankers

  11. The LNG Industry - 2009

    International Nuclear Information System (INIS)

    2010-04-01

    Estimates for the marketed production of natural gas in 2009 show a decrease of about 3.9% over 2008. The share of LNG in the gas trade accounts for 30% of the total (excluding trade within the Former Soviet Union and United Arab Emirates). This annual report presents: 1 - LNG contracts and trade, 2 - Contracts concluded in 2009, 3 - LNG imports - Sources of imports - Quantities received in 2009, 4 - LNG tankers, 5 - Ships delivered, 6 - Tanker distribution, 7 - Liquefaction plants, 8 - re-gasification plants, 9 - Contracts in force in 2009, 10 - Spot and short term quantities received in 2009, 11 - Sea transportation routes, 12 - Liquefaction plants (table), 13 - re-gasification plants (table), 14 - Delivery date of the LNG tankers

  12. PIF4 Promotes Expression of LNG1 and LNG2 to Induce Thermomorphogenic Growth in Arabidopsis

    Directory of Open Access Journals (Sweden)

    Geonhee Hwang

    2017-07-01

    Full Text Available Arabidopsis plants adapt to high ambient temperature by a suite of morphological changes including elongation of hypocotyls and petioles and leaf hyponastic growth. These morphological changes are collectively called thermomorphogenesis and are believed to increase leaf cooling capacity by enhancing transpiration efficiency, thereby increasing tolerance to heat stress. The bHLH transcription factor PHYTOCHROME INTERACTING FACTOR4 (PIF4 has been identified as a major regulator of thermomorphogenic growth. Here, we show that PIF4 promotes the expression of two homologous genes LONGIFOLIA1 (LNG1 and LONGIFOLIA2 (LNG2 that have been reported to regulate leaf morphology. ChIP-Seq analyses and ChIP assays showed that PIF4 directly binds to the promoters of both LNG1 and LNG2. The expression of LNG1 and LNG2 is induced by high temperature in wild type plants. However, the high temperature activation of LNG1 and LNG2 is compromised in the pif4 mutant, indicating that PIF4 directly regulates LNG1 and LNG2 expression in response to high ambient temperatures. We further show that the activities of LNGs support thermomorphogenic growth. The expression of auxin biosynthetic and responsive genes is decreased in the lng quadruple mutant, implying that LNGs promote thermomorphogenic growth by activating the auxin pathway. Together, our results demonstrate that LNG1 and LNG2 are directly regulated by PIF4 and are new components for the regulation of thermomorphogenesis.

  13. A risk-based approach to prioritize underground storage tanks

    International Nuclear Information System (INIS)

    Chidambariah, V.; Travis, C.C.; Trabalka, J.R.; Thomas, J.K.

    1992-01-01

    The purpose of this paper is to present a risk-based approach for rapid prioritization of low level liquid radioactive waste underground storage tanks (LLLW USTs) for possible interim corrective measures and/or ultimate closure. The ranking of LLLW USTs is needed to ensure that tanks with the greatest potential for adverse impact on the environment and human health receive top priority for further evaluation and remediation. Wastes from the LLLW USTs at the Oak Ridge National Laboratory (ORNL) were pumped out at the time the tanks were removed from service. The residual liquids and sludge contain a mixture of radionuclides and chemicals. Contaminants of concern that were identified in the liquid phase of the inactive LLLW USTs include, the radionuclides, 9O Sr, 137 Cs and 233 U and the chemicals, carbon tetrachloride, trichloroethene, tetrachloroethene, methyl ethyl ketone, mercury, lead and chromium. The risk-based approach for prioritization of the LLLW USTs is based upon three major criteria: (1) leaking characteristics of the tank; (2) location of the tanks; and (3) toxic potential of the tank contents

  14. Viewing Systems for Large Underground Storage Tanks

    International Nuclear Information System (INIS)

    Heckendorn, F.M.; Robinson, C.W.; Anderson, E.K.; Pardini, A.F.

    1996-01-01

    Specialized remote video systems have been successfully developed and deployed in a number of large radiological Underground Storage Tanks (USTs)that tolerate the hostile tank interior, while providing high resolution video to a remotely located operator. The deployment is through 100 mm (4 in) tank openings, while incorporating full video functions of the camera, lights, and zoom lens. The usage of remote video minimizes the potential for personnel exposure to radiological and hazardous conditions, and maximizes the quality of the visual data used to assess the interior conditions of both tank and contents. The robustness of this type of remote system has a direct effect on the potential for radiological exposure that personnel may encounter. The USTs typical of the Savannah River and Hanford Department Of Energy - (DOE) sites are typically 4.5 million liter (1.2 million gal) units under earth. or concrete overburden with limited openings to the surface. The interior is both highly contaminated and radioactive with a wide variety of nuclear processing waste material. Some of the tanks are -flammable rated -to Class 1, Division 1,and personnel presence at or near the openings should be minimized. The interior of these USTs must be assessed periodically as part of the ongoing management of the tanks and as a step towards tank remediation. The systems are unique in their deployment technology, which virtually eliminates the potential for entrapment in a tank, and their ability to withstand flammable environments. A multiplicity of components used within a common packaging allow for cost effective and appropriate levels of technology, with radiation hardened components on some units and lesser requirements on other units. All units are completely self contained for video, zoom lens, lighting, deployment,as well as being self purging, and modular in construction

  15. A computational study on the performance of a solar air-conditioning system with a partitioned storage tank

    International Nuclear Information System (INIS)

    Li, Z.F.; Sumathy, K.

    2003-01-01

    This paper reports the performance of a modified solar powered air-conditioning system, which is integrated with a partitioned storage tank. In addition, the effect of two main parameters that influence the system performance is presented and discussed. The study shows that by partitioning the storage tank, the solar cooling effect can be realized much earlier and could attain a total solar cooling COP of 12% higher compared to the conventional whole-tank mode. Simulation results also indicate that there exists an optimum ratio of storage tank volume over collector area

  16. Seven Operation Modes and Simulation Models of Solar Heating System with PCM Storage Tank

    Directory of Open Access Journals (Sweden)

    Juan Zhao

    2017-12-01

    Full Text Available A physical model and dynamic simulation models of a solar phase-change heat storage heating system with a plate solar collector, phase-change material (PCM storage tank, plate heat exchanger, and auxiliary heat sources were established. A control strategy and numerical models for each of seven different operation modes that cover the entire heating season of the system were developed for the first time. The seven proposed operation modes are Mode 1: free cooling; Mode 2: reservation of heat absorbed by the solar collector in the PCM storage tank when there is no heating demand; Mode 3: direct supply of the heating demand by the solar collector; Mode 4: use of the heat absorbed by the solar collector to meet the heating demands, with the excess heat stored in the PCM storage tank; Mode 5: use of heat stored in the PCM storage tank to meet the heating demands, Mode 6: combined use of heat stored in the PCM storage tank and the auxiliary heating sources to meet the heating demands; and Mode 7: exclusive use of the auxiliary heat sources in order to meet the heating demands. Mathematical models were established for each of the above seven operation modes, taking into consideration the effects of the outdoor meteorological parameters and terminal load on the heating system. The real-time parameters for the entire heating season of the system with respect to the different operation modes can be obtained by solving the simulation models, and used as reference for the optimal design and operation of the actual system.

  17. Analysis of Influence of Heat Insulation on the Thermal Regime of Storage Tanks with Liquefied Natural Gas

    Science.gov (United States)

    Maksimov, Vyacheslav I.; Nagornova, Tatiana A.; Glazyrin, Viktor P.; Shestakov, Igor A.

    2016-02-01

    Is numerically investigated the process of convective heat transfer in the reservoirs of liquefied natural gas (LNG). The regimes of natural convection in a closed rectangular region with different intensity of heat exchange at the external borders are investigated. Is solved the time-dependent system of energy and Navier-Stokes equations in the dimensionless variables "vorticity - the stream function". Are obtained distributions of the hydrodynamic parameters and temperatures, that characterize basic regularities of the processes. The special features of the formation of circulation flows are isolated and the analysis of the temperature distribution in the solution region is carried out. Is shown the influence of geometric characteristics and intensity of heat exchange on the outer boundaries of reservoir on the temperature field in the LNG storage.

  18. Equipment design guidance document for flammable gas waste storage tank new equipment

    International Nuclear Information System (INIS)

    Smet, D.B.

    1996-01-01

    This document is intended to be used as guidance for design engineers who are involved in design of new equipment slated for use in Flammable Gas Waste Storage Tanks. The purpose of this document is to provide design guidance for all new equipment intended for application into those Hanford storage tanks in which flammable gas controls are required to be addressed as part of the equipment design. These design criteria are to be used as guidance. The design of each specific piece of new equipment shall be required, as a minimum to be reviewed by qualified Unreviewed Safety Question evaluators as an integral part of the final design approval. Further Safety Assessment may be also needed. This guidance is intended to be used in conjunction with the Operating Specifications Documents (OSDs) established for defining work controls in the waste storage tanks. The criteria set forth should be reviewed for applicability if the equipment will be required to operate in locations containing unacceptable concentrations of flammable gas

  19. Dynamic analysis of liquid storage tank including hydrodynamic interaction by boundary element method

    International Nuclear Information System (INIS)

    Hwang, I.T.; Ting, K.

    1987-01-01

    Dynamic response of liquid storage tanks considering the hydrodynamic interactions due to earthquake ground motion has been extensively studied. Several finite element procedures, such as Balendra et. al. (1982) and Haroun (1983), have been devoted to investigate the dynamic interaction between the deformable wall of the tank and the liquid. Further, if the geometry of the storage tank can not be described by axi-symmetric case, the tank wall and the fluid domain must be discretized by three dimensional finite elements to investigate the fluid-structure-interactions. Thus, the need of large computer memory and expense of vast computer time usually make this analysis impractical. To demonstrate the accuracy and reliability of the solution technique developed herein, the dynamic behavior of ground-supported, deformed, cylindrical tank with incompressible fluid conducted by Haroun (1983) are analyzed. Good correlations of hydrodynamic pressure distribution between the computed results with the referenced solutions are noted. The fluid compressibility significantly affects the hydrodynamic pressures of the liquid-tank-interactions and the work which is done on this discussion is still little attention. Thus, the influences of the compressibility of the liquid on the reponse of the liquid storage due to ground motion are then drawn. By the way, the complex-valued frequency response functions for hydrodynamic forces of Haroun's problem are also displayed. (orig./GL)

  20. The LNG Industry - 2007

    International Nuclear Information System (INIS)

    2008-04-01

    Estimates for the marketed production of natural gas in 2007 show a rise of about 1.6% over 2006. The share of LNG in the gas trade accounts for almost 24% of the total. This annual report presents: 1 - LNG contracts and trade, 2 - Contracts concluded in 2007, 3 - LNG imports - Sources of imports - Quantities received in 2007, 4 - LNG tankers, 5 - 35 Ships delivered 10 2007, 6 - Tanker distribution, 7 - Liquefaction plants, 8 - re-gasification plants, 9 - Long-term and medium-term contracts in force in 2007, 10 - Spot and short term quantities received in 2007 by the importing countries from the exporting countries, 11 - Sea transportation routes, 12 - Liquefaction plants (table), 13 - re-gasification plants (table), 14 - Delivery date of the LNG tankers

  1. Cryogenic storage tank with built-in pump

    International Nuclear Information System (INIS)

    Zwick, E.B.

    1984-01-01

    A cryogenic storage tank with a built-in pump for pumping cryogen directly from the primary storage container consistent with low boil-off losses of cryogen has an outer vessel, an inner vessel and an evacuated insulation space therebetween. A pump mounting tube assembly extends into the interior of the inner vessel and includes an inner pump mounting tube and an outer pump mounting tube joined at their lower rims to define an insulating jacket between the two tubes. The inner pump mounting tube is affixed at its upper end to the outer vessel while the outer pump mounting tube is affixed at its upper end to the inner vessel. The inner pump mounting tube defines a relatively long heat path into the cryogenic container and is itself insulated from the liquid cryogen by a pocket of trapped gas formed within the inner pump mounting tube by heated cryogen. A pump may be introduced through the inner pump mounting tube and is also insulated against contact with liquid cryogen by the trapped gas such that only the lowermost end of the pump is immersed in cryogen thereby minimizing heat leakage into the tank

  2. Numerical simulation on stir system of jet ballast in high level liquid waste storage tank

    International Nuclear Information System (INIS)

    Lu Yingchun

    2012-01-01

    The stir system of jet ballast in high level liquid waste storage tank was simulation object. Gas, liquid and solid were air, sodium nitrate liquor and titanium whitening, respectively. The mathematic model based on three-fluid model and the kinetic theory of particles was established for the stir system of jet ballast in high level liquid waste storage tank. The CFD commercial software was used for solving this model. The detail flow parameters as three phase velocity, pressure and phase loadings were gained. The calculated results agree with the experimental results, so they can well define the flow behavior in the tank. And this offers a basic method for the scale-up and optimization design of the stir system of jet ballast in high level liquid waste storage tank. (author)

  3. Effects of lng Mutations on LngA Expression, Processing, and CS21 Assembly in Enterotoxigenic Escherichia coli E9034A

    Science.gov (United States)

    Saldaña-Ahuactzi, Zeus; Rodea, Gerardo E.; Cruz-Córdova, Ariadnna; Rodríguez-Ramírez, Viridiana; Espinosa-Mazariego, Karina; González-Montalvo, Martín A.; Ochoa, Sara A.; González-Pedrajo, Bertha; Eslava-Campos, Carlos A.; López-Villegas, Edgar O.; Hernández-Castro, Rigoberto; Arellano-Galindo, José; Patiño-López, Genaro; Xicohtencatl-Cortes, Juan

    2016-01-01

    Enterotoxigenic Escherichia coli (ETEC) is a major cause of morbidity in children under 5 years of age in low- and middle-income countries and a leading cause of traveler's diarrhea worldwide. The ability of ETEC to colonize the intestinal epithelium is mediated by fimbrial adhesins, such as CS21 (Longus). This adhesin is a type IVb pilus involved in adherence to intestinal cells in vitro and bacterial self-aggregation. Fourteen open reading frames have been proposed to be involved in CS21 assembly, hitherto only the lngA and lngB genes, coding for the major (LngA) and minor (LngB) structural subunit, have been characterized. In this study, we investigated the role of the LngA, LngB, LngC, LngD, LngH, and LngP proteins in the assembly of CS21 in ETEC strain E9034A. The deletion of the lngA, lngB, lngC, lngD, lngH, or lngP genes, abolished CS21 assembly in ETEC strain E9034A and the adherence to HT-29 cells was reduced 90%, compared to wild-type strain. Subcellular localization prediction of CS21 proteins was similar to other well-known type IV pili homologs. We showed that LngP is the prepilin peptidase of LngA, and that ETEC strain E9034A has another peptidase capable of processing LngA, although with less efficiency. Additionally, we present immuno-electron microscopy images to show that the LngB protein could be localized at the tip of CS21. In conclusion, our results demonstrate that the LngA, LngB, LngC, LngD, LngH, and LngP proteins are essential for CS21 assembly, as well as for bacterial aggregation and adherence to HT-29 cells. PMID:27536289

  4. 49 CFR 193.2187 - Nonmetallic membrane liner.

    Science.gov (United States)

    2010-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Design Lng Storage Tanks § 193.2187 Nonmetallic membrane liner. A flammable nonmetallic membrane liner may not be used as an inner container in a storage tank...

  5. The LNG Industry - 2005

    International Nuclear Information System (INIS)

    2006-04-01

    First estimates for the marketed production of natural gas in 2005 show a rise of about 1.5 % over 2004. The share of LNG in the gas trade accounts for almost 21 % of the total. This annual report presents: 1 - LNG contracts and trade, 2 - Contracts concluded in 2005, 3 - LNG imports - Sources of imports - Quantities received in 2005 by the importing countries from the exporting countries, 4 - LNG tankers, 5 - 18 Ships delivered in 2005, 6 - Tanker distribution, 7 - Liquefaction plants, 8 - re-gasification plants, 9 - Long-term and medium-term contracts in force in 2005, 10 - Spot and short term quantities received in 2005 by the importing countries from the exporting countries, 11 - Sea transportation routes, 12 - Liquefaction plants (table), 13 - re-gasification plants (table), 14 - Delivery date of the LNG tankers

  6. A lumped-parameter model for cryo-adsorber hydrogen storage tank

    Energy Technology Data Exchange (ETDEWEB)

    Senthil Kumar, V.; Raghunathan, K. [India Science Lab, General Motors R and D, Creator Building, International Technology Park, Bangalore 560066 (India); Kumar, Sudarshan [Chemical and Environmental Sciences Lab, General Motors R and D, 30500 Mound Road, Warren, MI 48090 (United States)

    2009-07-15

    One of the primary requirements for commercialization of hydrogen fuel-cell vehicles is the on-board storage of hydrogen in sufficient quantities. On-board storage of hydrogen by adsorption on nano-porous adsorbents at around liquid nitrogen temperatures and moderate pressures is considered viable and competitive with other storage technologies: liquid hydrogen, compressed gas, and metallic or complex hydrides. The four cryo-adsorber fuel tank processes occur over different time scales: refueling over a few minutes, discharge over a few hours, dormancy over a few days, and venting over a few weeks. The slower processes i.e. discharge, dormancy and venting are expected to have negligible temperature gradients within the bed, and hence are amenable to a lumped-parameter analysis. Here we report a quasi-static lumped-parameter model for the cryo-adsorber fuel tank, and discuss the results for these slower processes. We also describe an alternative solution method for dormancy and venting based on the thermodynamic state description. (author)

  7. LNG -- Technology on the edge

    International Nuclear Information System (INIS)

    Alexander, C.B.

    1995-01-01

    With immense promise and many supporters, LNG as a vehicular fuel is still, a nascent industry. In about two years, an array of LNG engines should be commercially available, and infrastructure greatly expanded. These developments should reduce the present premium of LNG equipment, greatly improving industry economics. The most propitious sign for LNG-market developed lies in the natural gas industry's recently refined strategy for natural gas vehicles. The new strategy targets the right competitor--diesel, not gasoline. It also targets the right market for an emerging fuel--high-fuel-usage fleets made up of medium- and heavy-duty vehicles, often driven long distances. But problems persist in critical areas of development. These problems are related to the materials handling of LNG and the refueling of vehicles. The paper discusses the studies on LNG handling procedures, its performance benefits to high-fuel use vehicles, economic incentives for its use, tax disadvantages that are being fought, and LNG competition with ''clean'' diesel fuels

  8. Heat pipe cooling system for underground, radioactive waste storage tanks

    International Nuclear Information System (INIS)

    Cooper, K.C.; Prenger, F.C.

    1980-02-01

    An array of 37 heat pipes inserted through the central hole at the top of a radioactive waste storage tank will remove 100,000 Btu/h with a heat sink of 70 0 F atmospheric air. Heat transfer inside the tank to the heat pipe is by natural convection. Heat rejection to outside air utilizes a blower to force air past the heat pipe condenser. The heat pipe evaporator section is axially finned, and is constructed of stainless steel. The working fluid is ammonia. The finned pipes are individually shrouded and extend 35 ft down into the tank air space. The hot tank air enters the shroud at the top of the tank and flows downward as it is cooled, with the resulting increased density furnishing the pressure difference for circulation. The cooled air discharges at the center of the tank above the sludge surface, flows radially outward, and picks up heat from the radioactive sludge. At the tank wall the heated air rises and then flows inward to comple the cycle

  9. EXAMINE AND EVALUATE A PROCESS TO USE SALT CAVERNS TO RECEIVE SHIP BORNE LIQUEFIED NATURAL GAS

    Energy Technology Data Exchange (ETDEWEB)

    Michael M. McCall; William M. Bishop; D. Braxton Scherz

    2003-04-24

    The goal of the U.S. Department of Energy cooperative research project is to define, describe, and validate, a process to utilize salt caverns to receive and store the cargoes of LNG ships. The project defines the process as receiving LNG from a ship, pumping the LNG up to cavern injection pressures, warming it to cavern compatible temperatures, injecting the warmed vapor directly into salt caverns for storage, and distribution to the pipeline network. The performance of work under this agreement is based on U.S. Patent 5,511,905, and other U.S. and Foreign pending patent applications. The cost sharing participants in the research are The National Energy Technology Laboratory (U.S. Department of Energy), BP America Production Company, Bluewater Offshore Production Systems (U.S.A.), Inc., and HNG Storage, L.P. Initial results indicate that a salt cavern based receiving terminal could be built at about half the capital cost, less than half the operating costs and would have significantly higher delivery capacity, shorter construction time, and be much more secure than a conventional liquid tank based terminal. There is a significant body of knowledge and practice concerning natural gas storage in salt caverns, and there is a considerable body of knowledge and practice in handling LNG, but there has never been any attempt to develop a process whereby the two technologies can be combined. Salt cavern storage is infinitely more secure than surface storage tanks, far less susceptible to accidents or terrorist acts, and much more acceptable to the community. The project team developed conceptual designs of two salt cavern based LNG terminals, one with caverns located in Calcasieu Parish Louisiana, and the second in Vermilion block 179 about 50 miles offshore Louisiana. These conceptual designs were compared to conventional tank based LNG terminals and demonstrate superior security, economy and capacity. The potential for the development of LNG receiving terminals

  10. The LNG Industry - 2004

    International Nuclear Information System (INIS)

    2005-04-01

    First estimates for the marketed production of natural gas in 2004 show a rise of about 2 % over 2003. The share of LNG in the gas trade accounts for 21.9 % of the total. This annual report presents: 1 - LNG contracts and trade, 2 - Contracts concluded in 2004, 3 - LNG imports - Sources of imports - Quantities received in 2005 by the importing countries from the exporting countries, 4 - LNG tankers, 5 - 21 Ships delivered in 2004, 6 - Tanker distribution (at the end of 2004), 7 - Liquefaction plants, 8 - re-gasification plants, 9 - Long-term and medium-term contracts in force in 2004, 10 - Spot and short term quantities received in 2004 by the importing countries from the exporting countries, 11 - Sea transportation routes, 12 - Liquefaction plants (table), 13 - re-gasification plants (table), 14 - Delivery date of the LNG tankers

  11. Soil structure interaction analysis for the Hanford Site 241-SY-101 double-shell waste storage tanks

    International Nuclear Information System (INIS)

    Giller, R.A.; Weiner, E.O.

    1991-09-01

    The 241-SY-101 tank is a double-shell waste storage tank buried in the 241-SY tank farm in the 200 West Area of the Hanford Site. This analysis addresses the effects of seismic soil-structure interaction on the tank structure and includes a parametric soil-structure interaction study addressing three configurations: two-dimensional soil structure, a two-dimensional structure-soil-structure, and a three-dimensional soil-structure interaction. This study was designed to determine an optimal method for addressing seismic-soil effects on underground storage tanks. The computer programs calculate seismic-soil pressures on the double-shell tank walls and and seismic acceleration response spectra in the tank. The results of this soil-structure interaction parametric study as produced by the computer programs are given in terms of seismic soil pressures and response spectra. The conclusions of this soil-structure interaction evaluation are that dynamically calculated soil pressures in the 241-SY-101 tank are significantly reduce from those using standard hand calculation methods and that seismic evaluation of underground double-shell waste storage tanks must consider soil-structure interaction effects in order to predict conservative structural response. Appendixes supporting this study are available in Volume 2 of this report

  12. LNG - the challenge of growth

    International Nuclear Information System (INIS)

    Summers, G.G.

    1992-01-01

    LNG growth prospects - both in the Far East and Atlantic Basin - have never been better. Natural gas is responding strongly to the green momentum and to its clear competitive advantage in power generation. To meet growing demand, the major energy buyers are turning increasingly to large remote reserves of gas which often can only be delivered as LNG. But, the market will decide when and which LNG projects are developed - and the trigger will be price. LNG will compete head-on not only with low priced oil and coal but, in some markets, also with long-haul pipeline gas. This paper outlines regional demand and supply opportunities for LNG and then considers the challenges that the LNG industry must now tackle if it is to realistically expect a larger share of the world's energy market

  13. South Tank Farm underground storage tank inspection using the topographical mapping system for radiological and hazardous environments

    International Nuclear Information System (INIS)

    Armstrong, G.A.; Burks, B.L.; Hoesen, S.D. van

    1997-07-01

    During the winter of 1997 the Topographical Mapping System (TMS) for hazardous and radiological environments and the Interactive Computer-Enhanced Remote-Viewing System (ICERVS) were used to perform wall inspections on underground storage tanks (USTs) W5 and W6 of the South Tank Farm (STF) at Oak Ridge National Laboratory (ORNL). The TMS was designed for deployment in the USTs at the Hanford Site. Because of its modular design, the TMS was also deployable in the USTs at ORNL. The USTs at ORNL were built in the 1940s and have been used to store radioactive waste during the past 50 years. The tanks are constructed with an inner layer of Gunite trademark that has been spalling, leaving sections of the inner wall exposed. Attempts to quantify the depths of the spalling with video inspection have proven unsuccessful. The TMS surface-mapping campaign in the STF was initiated to determine the depths of cracks, crevices, and/or holes in the tank walls and to identify possible structural instabilities in the tanks. The development of the TMS and the ICERVS was initiated by DOE for the purpose of characterization and remediation of USTs at DOE sites across the country. DOE required a three-dimensional, topographical mapping system suitable for use in hazardous and radiological environments. The intended application is mapping the interiors of USTs as part of DOE's waste characterization and remediation efforts, to obtain both baseline data on the content of the storage tank interiors and changes in the tank contents and levels brought about by waste remediation steps. Initially targeted for deployment at the Hanford Site, the TMS has been designed to be a self-contained, compact, and reconfigurable system that is capable of providing rapid variable-resolution mapping information in poorly characterized workspaces with a minimum of operator intervention

  14. Feasibility report on criticality issues associated with storage of K Basin sludge in tanks farms

    Energy Technology Data Exchange (ETDEWEB)

    Vail, T.S.

    1997-05-29

    This feasibility study provides the technical justification for conclusions about K Basin sludge storage options. The conclusions, solely based on criticality safety considerations, depend on the treatment of the sludge. The two primary conclusions are, (1) untreated sludge must be stored in a critically safe storage tank, and (2) treated sludge (dissolution, precipitation and added neutron absorbers) can be stored in a standard Double Contained Receiver Tank (DCRT) or 241-AW-105 without future restrictions on tank operations from a criticality safety perspective.

  15. Feasibility report on criticality issues associated with storage of K Basin sludge in tanks farms

    International Nuclear Information System (INIS)

    Vail, T.S.

    1997-01-01

    This feasibility study provides the technical justification for conclusions about K Basin sludge storage options. The conclusions, solely based on criticality safety considerations, depend on the treatment of the sludge. The two primary conclusions are, (1) untreated sludge must be stored in a critically safe storage tank, and (2) treated sludge (dissolution, precipitation and added neutron absorbers) can be stored in a standard Double Contained Receiver Tank (DCRT) or 241-AW-105 without future restrictions on tank operations from a criticality safety perspective

  16. Pursing other deep pockets: California's underground storage tank cleanup fund and insurance policies

    International Nuclear Information System (INIS)

    Almanza, P.R.

    1995-01-01

    When faced with a potentially very expensive environmental cleanup, most companies and individuals try to do the only sensible thing, which is to find out if anyone else will pay the bill. This presentation will outline two avenues that may provide a substantial financial contribution to environmental cleanups: (a) California's Underground Storage Tank Cleanup Fund and (b) insurance policies. The Underground Storage Tank Cleanup Fund was established in 1989 to help eligible owners and operators of petroleum underground storage tanks (USTs) to: (a) get reimbursed for costs of unauthorized releases of petroleum from USTs; (b) get reimbursed for damages awarded to third parties as a result of unauthorized releases of petroleum from USTs; and (c) meet federal and state requirements that the UST owner and/or operator be able to pay for cleanup costs and damages to third parties caused by unauthorized releases of petroleum

  17. Interim storage of sodium in ferritic steel tanks at ambient temperature

    International Nuclear Information System (INIS)

    Blackburn, L.D.

    1994-01-01

    Sodium tanks originally fabricated for elevated temperature service in the Clinch River Breeder Reactor Plant (CRBRP) will be used to store sodium removed from the Fast Flux Test Facility (FFTF) in the Sodium Storage Facility (SSF) at ambient temperature. This report presents an engineering review to confirm that protection against brittle fracture of the ferritic steel tanks is adequate for the intended service

  18. Analysis of Influence of Heat Insulation on the Thermal Regime of Storage Tanks with Liquefied Natural Gas

    Directory of Open Access Journals (Sweden)

    Maksimov Vyacheslav I.

    2016-01-01

    Full Text Available Is numerically investigated the process of convective heat transfer in the reservoirs of liquefied natural gas (LNG. The regimes of natural convection in a closed rectangular region with different intensity of heat exchange at the external borders are investigated. Is solved the time-dependent system of energy and Navier-Stokes equations in the dimensionless variables “vorticity – the stream function”. Are obtained distributions of the hydrodynamic parameters and temperatures, that characterize basic regularities of the processes. The special features of the formation of circulation flows are isolated and the analysis of the temperature distribution in the solution region is carried out. Is shown the influence of geometric characteristics and intensity of heat exchange on the outer boundaries of reservoir on the temperature field in the LNG storage.

  19. Key issues considered at LNG 13

    International Nuclear Information System (INIS)

    Kidd, S.

    2001-01-01

    In the past few years, deregulation of the gas markets throughout the world has changed the way LNG projects can be brought into realisation. Gone are the days when large consortia of buyers could aggregate demand into quantities that made an LNG project economic. Today's market is typified by buyers requesting greater flexibility in volumes, shorter contract terms and reduced exposure to take-or-pay clauses. This means that the onus is on the producer to aggregate volume to make a large project viable, and to find flexible supply options as demand increases. As a result, there is an increasing ability to source LNG from excess capacity around the world, as has been demonstrated with the extended shutdown of the Arun LNG plant in Indonesia. Although some flexibility exists for the supply of LNG, it is unlikely that a world market where LNG is freely traded will develop. LNG projects will still require long-term contracts to ensure project financing. Furthermore, the 'LNG world' will remain separated into two regions the Atlantic and Asia-Pacific basins with only small amounts of 'spot' trading occurring between them. This is primarily due to the increased shipping costs associated with the global movement of LNG, and thus the ability to compete with closer sources of LNG and pipeline gas. Australia's position and its challenges in the LNG market is analysed

  20. Structural Performance Optimization and Verification of an Improved Thin-Walled Storage Tank for a Pico-Satellite

    Directory of Open Access Journals (Sweden)

    Lai Teng

    2017-11-01

    Full Text Available This paper presents an improved mesh storage tank structure obtained using 3D metal printing. The storage tank structure is optimized using a multi-objective uniform design method. Each parameter influencing the storage tank is considered as the optimization factor, and the compression stress ( σ , volume utilization ratio ( v , and weight ( m , are considered as the optimization objectives. Regression equations were established between the optimization factors and targets, the orders of the six factors affecting three target values are analyzed, and the relative deviations between the regression equation and calculation results for σ , v , and m were 9.72%, 4.15%, and 2.94%, respectively. The optimization results showed that the regression equations can predict the structure performance of the improved storage tank, and the values of the influence factors obtained through the optimization are effective. In addition, the compression stress was improved by 24.98%, the volume utilization ratio was increased by 26.86%, and the weight was reduced by 26.83%. The optimized storage tank was developed through 3D metal printing, and the compressive stress was improved by 58.71%, the volume utilization ratio was increased by 24.52%, and the weight was reduced by 11.67%.

  1. Model based, sensor-directed remediation of underground storage tanks

    International Nuclear Information System (INIS)

    Harrigan, R.W.; Thunborg, S.

    1990-01-01

    Sensor-rich, intelligent robots that function with respect to models of their environment have significant potential to reduce the time and cost for the cleanup of hazardous waste while increasing operator safety. Sandia National Laboratories (SNL) is performing technology development and experimental investigations into the application of intelligent robot control technology to the problem of cleaning up waste stored in underground tanks. The tasks addressed in the SNL experiments are in situ physical characterizations of underground storage tanks (USTs) as well as the contained waste and the removal of the waste from the tank both for laboratory analysis and as part of the tank cleanup process. Both fully automatic and manual robot control technologies are being developed and demonstrated. The SNL-developed concept of human-assisted computer control will be employed whenever manual control of the robot is required. The UST Robot Technology Development Laboratory (URTDL) consists of a commercial gantry robot modified to allow hybrid force/position control

  2. Thermal analysis elements of liquefied gas storage tanks

    Science.gov (United States)

    Yanvarev, I. A.; Krupnikov, A. V.

    2017-08-01

    Tasks of solving energy and resource efficient usage problems, both for oil producing companies and for companies extracting and transporting natural gas, are associated with liquefied petroleum gas technology development. Improving the operation efficiency of liquefied products storages provides for conducting structural, functional, and appropriate thermal analysis of tank parks in the general case as complex dynamic thermal systems.

  3. WVNS Tank Farm Process Support: Experimental evaluation of an inert gas (nitrogen) to mitigate external corrosion of high-level waste storage tanks

    International Nuclear Information System (INIS)

    Elmore, M.R.

    1996-02-01

    Corrosion of the carbon steel waste storage tanks at West Valley Nuclear Services continues to be of concern, especially as the planned duration of waste storage time increases and sludge washing operations are conducted. The external surfaces of Tanks 8D-1 and 8D-2 have been exposed for more than 10 years to water that has intruded into the tank vaults. Visual inspection of the external tank surfaces using a remote video camera has shown indications of heavy corrosion in localized areas on the tank walls. Tests on mild steel specimens under simulated tank vault conditions showed that corrosion is related to the availability of oxygen for the corrosion reactions; consequently, removing oxygen as one of the reactants should effectively eliminate corrosion. In terms of the waste tanks, excluding oxygen from the annular vault space, such as by continuous flushing with an inert gas, should substantially decrease corrosion of the external surfaces of the mild steel tanks (100% exclusion of oxygen is probably not practicable). Laboratory corrosion testing was conducted at Pacific Northwest National Laboratory to give a preliminary assessment of the ability of nitrogen-inerting to reduce steel corrosion. This report summarizes test results obtained after 18-month corrosion tests comparing open-quotes nitrogen-inertedclose quotes corrosion with open-quotes air-equilibratedclose quotes corrosion under simulated tank vault conditions

  4. Safe interim storage of Hanford tank wastes, draft environmental impact statement, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This Draft EIS is prepared pursuant to the National Environmental Policy Act (NEPA) and the Washington State Environmental Policy Act (SEPA). DOE and Ecology have identified the need to resolve near-term tank safety issues associated with Watchlist tanks as identified pursuant to Public Law (P.L.) 101-510, Section 3137, ``Safety Measures for Waste Tanks at Hanford Nuclear Reservation,`` of the National Defense Authorization Act for Fiscal Year 1991, while continuing to provide safe storage for other Hanford wastes. This would be an interim action pending other actions that could be taken to convert waste to a more stable form based on decisions resulting from the Tank Waste Remediation System (TWRS) EIS. The purpose for this action is to resolve safety issues concerning the generation of unacceptable levels of hydrogen in two Watchlist tanks, 101-SY and 103-SY. Retrieving waste in dilute form from Tanks 101-SY and 103-SY, hydrogen-generating Watchlist double shell tanks (DSTs) in the 200 West Area, and storage in new tanks is the preferred alternative for resolution of the hydrogen safety issues.

  5. Safe interim storage of Hanford tank wastes, draft environmental impact statement, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1994-07-01

    This Draft EIS is prepared pursuant to the National Environmental Policy Act (NEPA) and the Washington State Environmental Policy Act (SEPA). DOE and Ecology have identified the need to resolve near-term tank safety issues associated with Watchlist tanks as identified pursuant to Public Law (P.L.) 101-510, Section 3137, ''Safety Measures for Waste Tanks at Hanford Nuclear Reservation,'' of the National Defense Authorization Act for Fiscal Year 1991, while continuing to provide safe storage for other Hanford wastes. This would be an interim action pending other actions that could be taken to convert waste to a more stable form based on decisions resulting from the Tank Waste Remediation System (TWRS) EIS. The purpose for this action is to resolve safety issues concerning the generation of unacceptable levels of hydrogen in two Watchlist tanks, 101-SY and 103-SY. Retrieving waste in dilute form from Tanks 101-SY and 103-SY, hydrogen-generating Watchlist double shell tanks (DSTs) in the 200 West Area, and storage in new tanks is the preferred alternative for resolution of the hydrogen safety issues

  6. Underside corrosion of above ground storage tanks (ASTs) | Rim ...

    African Journals Online (AJOL)

    ... above statutory safe limits. The results showed that the physico-chemical characteristics of the water sample have diagnostic and predictive values to implicate and promote underside corrosion of the studied above ground storage tank. Journal of Applied Sciences and Environmental Management Vol. 9(1) 2005: 161-163.

  7. Specialized video systems for use in underground storage tanks

    International Nuclear Information System (INIS)

    Heckendom, F.M.; Robinson, C.W.; Anderson, E.K.; Pardini, A.F.

    1994-01-01

    The Robotics Development Groups at the Savannah River Site and the Hanford site have developed remote video and photography systems for deployment in underground radioactive waste storage tanks at Department of Energy (DOE) sites as a part of the Office of Technology Development (OTD) program within DOE. Figure 1 shows the remote video/photography systems in a typical underground storage tank environment. Viewing and documenting the tank interiors and their associated annular spaces is an extremely valuable tool in characterizing their condition and contents and in controlling their remediation. Several specialized video/photography systems and robotic End Effectors have been fabricated that provide remote viewing and lighting. All are remotely deployable into and from the tank, and all viewing functions are remotely operated. Positioning all control components away from the facility prevents the potential for personnel exposure to radiation and contamination. Overview video systems, both monaural and stereo versions, include a camera, zoom lens, camera positioner, vertical deployment system, and positional feedback. Each independent video package can be inserted through a 100 mm (4 in.) diameter opening. A special attribute of these packages is their design to never get larger than the entry hole during operation and to be fully retrievable. The End Effector systems will be deployed on the large robotic Light Duty Utility Arm (LDUA) being developed by other portions of the OTD-DOE programs. The systems implement a multi-functional ''over the coax'' design that uses a single coaxial cable for all data and control signals over the more than 900 foot cable (or fiber optic) link

  8. Closure Report for Corrective Action Unit 135: Areas 25 Underground Storage Tanks, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    D. H. Cox

    2001-06-01

    Corrective Action Unit (CAU) 135, Area 25 Underground Storage Tanks, was closed in accordance with the approved Corrective Action Plan (DOE/NV, 2000). CAU 135 consists of three Corrective Action Sites (CAS). Two of these CAS's were identified in the Corrective Action Investigation Data Quality Objective meeting as being improperly identified as underground storage tanks. CAS 25-02-03 identified as the Deluge Valve Pit was actually an underground electrical vault and CAS 25-02-10 identified as an Underground Storage Tank was actually a former above ground storage tank filled with demineralized water. Both of these CAS's are recommended for a no further action closure. CAS 25-02-01 the Underground Storage Tanks commonly referred to as the Engine Maintenance Assembly and Disassembly Waste Holdup Tanks and Vault was closed by decontaminating the vault structure and conducting a radiological verification survey to document compliance with the Nevada Test Site unrestricted use release criteria. The Area 25 Underground Storage Tanks, (CAS 25-02-01), referred to as the Engine Maintenance, Assembly, and Disassembly (E-MAD) Waste Holdup Tanks and Vault, were used to receive liquid waste from all of the radioactive and cell service area drains at the E-MAD Facility. Based on the results of the Corrective Action Investigation conducted in June 1999, discussed in ''The Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada'' (DOE/NV, 199a), one sample from the radiological survey of the concrete vault interior exceeded radionuclide preliminary action levels. The analytes from the sediment samples exceeded the preliminary action levels for polychlorinated biphenyls, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons as diesel-range organics, and radionuclides. The CAU 135 closure activities consisted of scabbling radiological ''hot spots

  9. Guidance on risk analysis and safety implications of a large liquefied natural gas (LNG) spill over water.

    Energy Technology Data Exchange (ETDEWEB)

    Wellman, Gerald William; Melof, Brian Matthew; Luketa-Hanlin, Anay Josephine; Hightower, Marion Michael; Covan, John Morgan; Gritzo, Louis Alan; Irwin, Michael James; Kaneshige, Michael Jiro; Morrow, Charles W.

    2004-12-01

    While recognized standards exist for the systematic safety analysis of potential spills or releases from LNG (Liquefied Natural Gas) storage terminals and facilities on land, no equivalent set of standards or guidance exists for the evaluation of the safety or consequences from LNG spills over water. Heightened security awareness and energy surety issues have increased industry's and the public's attention to these activities. The report reviews several existing studies of LNG spills with respect to their assumptions, inputs, models, and experimental data. Based on this review and further analysis, the report provides guidance on the appropriateness of models, assumptions, and risk management to address public safety and property relative to a potential LNG spill over water.

  10. Development of simulated tank wastes for the US Department of Energy's Underground Storage Tank Integrated Demonstration

    International Nuclear Information System (INIS)

    Elmore, M.R.; Colton, N.G.; Jones, E.O.

    1992-08-01

    The purpose of the Underground Storage Tank Integrated Demonstration (USTID) is to identify and evaluate technologies that may be used to characterize, retrieve, treat, and dispose of hazardous and radioactive wastes contained in tanks on US Department of Energy sites. Simulated wastes are an essential component of the evaluation process because they provide controlled samples for technology assessment, and minimize costs and risks involved when working with radioactive wastes. Pacific Northwest Laboratory has developed a recipe to simulate Hanford single-shell tank, (SST) waste. The recipe is derived from existing process recipes, and elemental concentrations are based on characterization data from 18 SSTs. In this procedure, salt cake and metal oxide/hydroxide sludge are prepared individually, and mixed together at varying ratios depending on the specific tank, waste to be simulated or the test being conducted. Elemental and physical properties of the stimulant are comparable with analyzed tank samples, and chemical speciation in the simulant is being improved as speciation data for actual wastes become available. The nonradioactive chemical waste simulant described here is useful for testing technologies on a small scale

  11. North America and Asia Pacific LNG markets

    International Nuclear Information System (INIS)

    Pirie, J.D.

    1997-01-01

    The liquefied natural gas (LNG) export opportunities in the Asia Pacific market were reviewed. Some of the differences that affect a North American LNG projects compared to more typical LNG projects were also outlined. The two main aspects of the LNG market in North America include the establishment of LNG import terminals on the east and southern coasts of the United States and the development of export oriented LNG projects. The Pac-Rim LNG project calls for initial delivery to South Korea of 4.0 MTPA by the end of 2000. A large LNG project has also been proposed for the year 2005 which would use Prudhoe Bay gas. Generally, in North America, there is little use for large scale LNG import projects because of the vast pipeline network that delivers gas reliably and at low cost anywhere in North America. However, LNG remains a good alternative for the Asia Pacific region because of the lack of a pipeline network. Also, Japan, Korea and Taiwan, the three main centers for LNG demand, have no domestic energy supplies and rely on imported energy sources. China is another major market opportunity for LNG. The Pac-Rim LNG project differs from others of its kind in that usually, an LNG project is based on the availability of large reservoirs of natural gas owned by state governments and involves production agreements with multi-national oil and gas companies. This scenario is simply not possible in Canada's deregulated environment. In contrast, the existence of upstream facilities, technical expertise, and low capital costs, hence reduced risks and time to develop an LNG project, gives Canada significant advantages. 3 tabs., 3 figs

  12. The mathematical model accuracy estimation of the oil storage tank foundation soil moistening

    Science.gov (United States)

    Gildebrandt, M. I.; Ivanov, R. N.; Gruzin, AV; Antropova, L. B.; Kononov, S. A.

    2018-04-01

    The oil storage tanks foundations preparation technologies improvement is the relevant objective which achievement will make possible to reduce the material costs and spent time for the foundation preparing while providing the required operational reliability. The laboratory research revealed the nature of sandy soil layer watering with a given amount of water. The obtained data made possible developing the sandy soil layer moistening mathematical model. The performed estimation of the oil storage tank foundation soil moistening mathematical model accuracy showed the experimental and theoretical results acceptable convergence.

  13. Structural analysis of ORNL underground gunite waste storage tanks

    International Nuclear Information System (INIS)

    Fricke, K.E.

    1995-01-01

    The North Tank Farm (NTF) and the South Tank Farm (STF) located at ORNL contains 8 underground waste storage tanks which were built around 1943. The tanks were used to collect and store the liquid portion of the radioactive and/or hazardous chemical wastes produced as part of normal facility operations at ORNL, but are no longer part of the active Low Level Liquid Waste system of the Laboratory. The tanks were constructed of gunite. The six STF tanks are 50 ft in diameter, and have a 12 ft sidewall, and an arched dome rising another 6.25 ft. The sidewall are 6 in. thick and have an additional 1.5 in. gunite liner on the inside. There is a thickened ring at the wall-dome juncture. The dome consists of two 5 in. layers of gunite. The two tanks in the NTF are similar, but smaller, having a 25 ft diameter, no inner liner, and a dome thickness of 3.5 in. Both sets of tanks have welded wire mesh and vertical rebars in the walls, welded wire mesh in the domes, and horizontal reinforcing hoop bars pre-tensioned to 35 to 40 ksi stress in the walls and thickened ring. The eight tanks are entirely buried under a 6 ft layer of soil cover. The present condition of the tanks is not accurately known, since access to them is extremely limited. In order to evaluate the structural capability of the tanks, a finite element analysis of each size tank was performed. Both static and seismic loads were considered. Three sludge levels, empty, half-full, and full were evaluated. In the STF analysis, the effects of wall deterioration and group spacing were evaluated. These analyses found that the weakest element in the tanks is the steel resisting the circumferential (or hoop) forces in the dome ring, a fact verified separately by an independent reviewer. However, the hoop steel has an adequate demand/capacity ratio. Buckling of the dome and the tank walls is not a concern

  14. Second law characterization of stratified thermal storage tanks

    Energy Technology Data Exchange (ETDEWEB)

    Fraidenraich, N [Departamento de Energia Nuclear-UFPE (Brazil)

    2000-07-01

    It is well known that fluid stratification in thermal storage tanks improves the overall performance of solar thermal systems, when compared with systems operating with uniform fluid temperature. From the point of view of the first law of thermodynamics, no difference exists between storage tanks with the same mass and average temperature, even if they have different stratified thermal structures. Nevertheless, the useful thermal energy that can be obtained from them might differ significantly. In this work, we derive an expression able to characterize the stratified configuration of thermal fluid. Using results obtained by thermodynamics of irreversible processes, the procedure adopted consists in calculating the maximum work available from the tank's thermal layer is able to develop. We arrive, then, at a dimensionless expression, the stratification parameter (SP), which depends on the mass fraction and absolute temperature of each thermal layer as well as the thermal fluid average temperature. Numerical examples for different types of tank stratification are given and it is verified that the expression obtained is sensitive to small differences in the reservoir thermal configuration. For example a thermal storage with temperatures equal to 74 Celsius degrees, 64 Celsius degrees and 54 Celsius degrees, with its mass equally distributed along the tank yields, for the parameter SP, a figure equal to 0.000294. On the other hand a storage tank with the same average temperature but with different layer's temperatures 76 Celsius degrees, 64 and 52 Celsius degrees, also with uniform mass distribution, yields for SP a value equal to quantitative evaluation of the stratification structure of thermal reservoirs. [Spanish] Es bien conocido que la estratificacion fluida en tanques de almacenamiento termico mejora el rendimiento total de los sistemas termicos solares en comparacion con sistemas que operan con temperatura uniforme del fluido. Desde el punto de vista

  15. LNG projects - nationally and internationally

    International Nuclear Information System (INIS)

    Graff, Oscar Fr.

    2006-01-01

    The presentation discusses various aspects of LNG projects nationally and internationally. The emphasis is on the future development of the natural gas markets, the competitiveness and economic requirements of the LNG production and transportation systems and the demands LNG projects will have to competence, technology, products and management

  16. Safety in Liquefied Natural Gas (LNG) Operations

    Energy Technology Data Exchange (ETDEWEB)

    Buhrow, C. [Technische Univ. Bergakademie, Freiberg (Germany). Lehrstuhl Bergbau/Tiefbau; Niemann-Delius, C.; Okafor, E. [Technische Hochschule Aachen (Germany). Lehrstuhl und Inst. fuer Bergbaukunde 3

    2005-07-01

    Germany needs an LNG receiving terminal to import LNG and supplement expected future gas supply shortages. Enormous economic benefits also abound if Germany is to install an LNG receiving terminal. Jobs will be created for several hundred people. New tax revenues will be generated for state and local governments and this will further enhance the economic competitiveness of Germany. Additionally, it will provide Germany with a reliable source of clean-burning energy. Any proposed LNG receiving terminal should incorporate safety right from the start. These safety requirements will: ensure that certain public land uses, people, and structures outside the LNG facility boundaries are protected in the event of LNG fire, prevent vapour clouds associated with an LNG spill from reaching a property line that can be built upon, prevent severe burns resulting from thermal radiation, specify requirements for design, construction and use of LNG facilities and other equipments, and promote safe, secure and reliable LNG operations. The German future LNG business will not be complete without the evolution of both local and international standards that can apply to LNG operations. Currently existing European standards also appear inadequate. With an OHSAS 18001 management system integrated with other existing standards we can better control our LNG occupational health and safety risks, and improve performance in the process. Additionally, an OHSAS 18001 System will help future German LNG contractors and operators safeguard their most important assets - their employees. (orig.)

  17. Advancing the US Department of Energy's Technologies through the Underground Storage Tank: Integrated Demonstration Program

    International Nuclear Information System (INIS)

    Gates, T.E.

    1993-01-01

    The principal objective of the Underground Storage Tank -- Integrated Demonstration Program is the demonstration and continued development of technologies suitable for the remediation of waste stored in underground storage tanks. The Underground Storage Tank Integrated Demonstration Program is the most complex of the integrated demonstration programs established under the management of the Office of Technology Development. The Program has the following five participating sites: Oak Ridge, Idaho, Fernald, Savannah River, and Hanford. Activities included within the Underground Storage Tank -- Integrated Demonstration are (1) characterizating radioactive and hazardous waste constituents, (2) determining the need and methodology for improving the stability of the waste form, (3) determining the performance requirements, (4) demonstrating barrier performance by instrumented field tests, natural analog studies, and modeling, (5) determining the need and method for destroying and stabilizing hazardous waste constituents, (6) developing and evaluating methods for retrieving, processing (pretreatment and treatment), and storing the waste on an interim basis, and (7) defining and evaluating waste packages, transportation options, and ultimate closure techniques including site restoration. The eventual objective is the transfer of new technologies as a system to full-scale remediation at the US Department of Energy complexes and sites in the private sector

  18. A STUDY OF CORROSION AND STRESS CORROSION CRACKING OF CARBON STEEL NUCLEAR WASTE STORAGE TANKS

    International Nuclear Information System (INIS)

    BOOMER, K.D.

    2007-01-01

    The Hanford reservation Tank Farms in Washington State has 177 underground storage tanks that contain approximately 50 million gallons of liquid legacy radioactive waste from cold war plutonium production. These tanks will continue to store waste until it is treated and disposed. These nuclear wastes were converted to highly alkaline pH wastes to protect the carbon steel storage tanks from corrosion. However, the carbon steel is still susceptible to localized corrosion and stress corrosion cracking. The waste chemistry varies from tank to tank, and contains various combinations of hydroxide, nitrate, nitrite, chloride, carbonate, aluminate and other species. The effect of each of these species and any synergistic effects on localized corrosion and stress corrosion cracking of carbon steel have been investigated with electrochemical polarization, slow strain rate, and crack growth rate testing. The effect of solution chemistry, pH, temperature and applied potential are all considered and their role in the corrosion behavior will be discussed

  19. Seismic response of unanchored and partially anchored liquid-storage tanks. Final report

    International Nuclear Information System (INIS)

    Malhotra, P.K.; Veletsos, A.S.

    1995-12-01

    Ground-mounted vertical storage tanks are important components of nuclear plant safety systems. A systematic study is made of the principal effects of base uplifting on the seismic response of laterally excited, unanchored and partially anchored cylindrical liquid-storage tanks. The study consists of two parts: the first deals with the static uplifting resistance of the flexible base plate, and the second deals with the dynamic response of the uplifting system. An insight into the behavior of the uplifting base plate is first gained with the help of a prismatic beam solution. In Section 2, the solution is implemented exactly, whereas in Section 3 it is implemented approximately by use of the Ritz energy procedure. Solutions are next presented for axisymmetrically and asymmetrically uplifted base plate of tanks, in Section 4. For the axisymmetric case the solution is implemented exactly, as well as approximately by modeling the plate by a series of semiinfinite prismatic beams. The accuracy of the latter approach is confirmed by comparing its predictions with those of the former. In Section 5, a highly efficient and rational method is presented for the dynamic response analysis of uplifting tanks. Both unanchored tanks and partially anchored tanks, for which the number of anchor bolts at the base is insufficient to ensure full fixity, are considered. It is shown that base uplifting may reduce significantly the hydrodynamic pressures, but these reductions may be associated with increased axial compressive stresses in the tank wall and large plastic rotations at the plate-shell junction. For partially anchored tanks, energy loss due to bolt yielding is found to be small

  20. Experimental Study of a Thermosyphon Solar Water Heater Coupled to a Fibre-Reinforced Plastic (FRP) Storage Tank

    International Nuclear Information System (INIS)

    Nwosu, P. N.; Oparaku, O. U.; Okonkwo, W. I.; Unachukwu, G. O.; Agbiogwu, D.

    2011-01-01

    The thermal performance of the thermosyphon solar water heater was analyzed to show its applicability in a tropical climate using data of cloudy, sunny and hazy days. The average daily efficiency of the parallel-connected module, ranged between 35 and 40%. Also, an analysis of the temperature storage characteristics of a novel fibre-reinforced plastic (FRP) storage tank was undertaken. The inlet andoutlet positions were determined using the recommendation of Simon and Wenxian [1]: the optional position for the inlet/outlet was around the very top/bottom of the tank. The obtained results showed that the coupled FRP tank substantially retained and delivered the stored hot water during off-sunshine hours with minimal losses, and stratification occurred in the tank as a result. In view of the thermal performance, FRP materials can be efficiently employed in the design of solar hot water storage tanks. (authors)

  1. The LNG Industry - 2010

    International Nuclear Information System (INIS)

    2011-04-01

    In 2010, global energy demand has recovered. Estimates for World Natural Gas consumption show a 7.3% increase compared with 2009 thanks to the economic rally and the cold winter conditions in Western countries. Due to the decline of indigenous productions in mature markets and to the development of new gas markets, international gas flows continued to expand, and total international gas trade increased by 10.9% compared with 2009. In this context, LNG flows recorded the largest growth with a 21% increase in 2010, the operational start-up of new liquefaction capacity in Qatar being the primary reason. By comparison, pipeline trade increased by 7%. This annual report presents: 1 - LNG contracts and trade, 2 - Contracts concluded in 2010, 3 - LNG imports - Sources of imports - Quantities received in 2010, 4 - LNG tankers, 5 - Ships delivered, 6 - Tanker distribution, 7 - Liquefaction plants, 8 - re-gasification plants, 9 - Contracts in force in 2010, 10 - Spot and short term quantities received in 2010, 11 - Sea transportation routes, 12 - Liquefaction plants (table), 13 - re-gasification plants (table), 14 - Delivery date of the LNG tankers

  2. Polymer/Silicate Nanocomposites Used to Manufacture Gas Storage Tanks With Reduced Permeability

    Science.gov (United States)

    Campbell, Sandi G.; Johnston, Chris

    2004-01-01

    Over the past decade, there has been considerable research in the area of polymer-layered silicate nanocomposites. This research has shown that the dispersion of small amounts of an organically modified layered silicate improves the polymer strength, modulus, thermal stability, and barrier properties. There have been several reports on the dispersion of layered silicates in an epoxy matrix. Potential enhancements to the barrier properties of epoxy/silicate nanocomposites make this material attractive for low permeability tankage. Polymer matrix composites (PMCs) have several advantages for cryogenic storage tanks. They are lightweight, strong, and stiff; therefore, a smaller fraction of a vehicle's potential payload capacity is used for propellant storage. Unfortunately, the resins typically used to make PMC tanks have higher gas permeability than metals. This can lead to hydrogen loss through the body of the tank instead of just at welds and fittings. One approach to eliminate this problem is to build composite tanks with thin metal liners. However, although these tanks provide good permeability performance, they suffer from a substantial mismatch in the coefficient of thermal expansion, which can lead to failure of the bond between the liner and the body of the tank. Both problems could be addressed with polymersilicate nanocomposites, which exhibit reduced hydrogen permeability, making them potential candidates for linerless PMC tanks. Through collaboration with Northrop Grumman and Michigan State University, nanocomposite test tanks were manufactured for the NASA Glenn Research Center, and the helium permeability was measured. An organically modified silicate was prepared at Michigan State University and dispersed in an epoxy matrix (EPON 826/JeffamineD230). The epoxy/silicate nanocomposites contained either 0 or 5 wt% of the organically modified silicate. The tanks were made by filament winding carbon fibers with the nanocomposite resin. Helium permeability

  3. Corrosion Evaluation of INTEC Waste Storage Tank WM-182

    International Nuclear Information System (INIS)

    Dirk, W. J.; Anderson, P. A.

    1999-01-01

    ). For purposes of waste storage, this is a negligible amount of metal loss. Localized corrosion such as cracking, pitting, preferential weld attack, or weld heat affected zone attack is not expected to be a materials problem in the tank

  4. Thermo-mechanical parametric analysis of packed-bed thermocline energy storage tanks

    International Nuclear Information System (INIS)

    González, Ignacio; Pérez-Segarra, Carlos David; Lehmkuhl, Oriol; Torras, Santiago; Oliva, Assensi

    2016-01-01

    Highlights: • A numerical model of packed-bed thermocline thermal storage for CSP is presented. • Up-to-date commercial configurations are tested both thermally and structurally. • Promising thermal performance is obtained with a temperature difference of 100 °C. • Reliable factors of safety against material yielding and ratcheting can be obtained. • Cyclic relaxation-traction elastic wall stresses arise with plant normal operation. - Abstract: A packed-bed thermocline tank represents a proved cheaper thermal energy storage for concentrated solar power plants compared with the commonly-built two-tank system. However, its implementation has been stopped mainly due to the vessel’s thermal ratcheting concern, which would compromise its structural integrity. In order to have a better understanding of the commercial viability of thermocline approach, regarding energetic effectiveness and structural reliability, a new numerical simulation platform has been developed. The model dynamically solves and couples all the significant components of the subsystem, being able to evaluate its thermal and mechanical response over plant normal operation. The filler material is considered as a cohesionless bulk solid with thermal expansion. For the stresses on the tank wall the general thermoelastic theory is used. First, the numerical model is validated with the Solar One thermocline case, and then a parametric analysis is carried out by settling this storage technology in two real plants with a temperature rise of 100 °C and 275 °C. The numerical results show a better storage performance together with the lowest temperature difference, but both options achieve suitable structural factors of safety with a proper design.

  5. Impact of environmental conditions on sub-surface storage tanks ...

    African Journals Online (AJOL)

    Cast iron made storage tanks with gasoline fluid were buried under the soil at a depth of 4 m under various environment conditions. The simulated conditions include natural rain fail, temperature and acidic, alkaline and neutral soils. A control condition of neutral sea sand as base and filling materials were also investigated.

  6. LNG - emergency control

    Energy Technology Data Exchange (ETDEWEB)

    Berardinelli, Ricardo Porto; Correa, Kleber Macedo; Moura Filho, Nelson Barboza de; Fernandez, Carlos Antonio [TRANSPETRO, Rio de Janeiro, RJ (Brazil); Matos, Jose Eduardo Nogueira de [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The operation of liquefied natural gas (LNG) is pioneering within the PETROBRAS System. PETROBRAS Transporte - TRANSPETRO is going to operate two flexible LNG terminals, located in Ceara and Rio de Janeiro. In accordance with the Corporate Health, Safety and Environmental (HSE) Directive - Training, Education and Awareness, PETROBRAS Transporte S.A. - TRANSPETRO has prepared an action plan with the objective of ensuring the operational safety of the undertaking. Among other actions a training program for the emergency control of LNG will be inserted into the timetable. The above mentioned training program was held over a period of 20 hours, and was divided between theory and practice. In the theoretical part, the characteristics of the product, the history of accidents and the emergency response procedures were covered. In the practical part, 3000 gallons of LNG were utilized where the behavior of the product could be confirmed following a confined leak, thereby verifying the efficacy of the emergency control resources. The teaching process of the course was developed in the company through the preparation of specific procedures, emergency plans and the formation of internal instructors. (author)

  7. Power and LPG production with LNG import

    International Nuclear Information System (INIS)

    Mak, J.Y.

    2004-01-01

    When used in power cogeneration, Liquefied Natural Gas (LNG) is both energy efficient and can eliminate seawater or fuel gas consumption as well as the associated environmental impacts of conventional regasification processes. However, some liquefied natural gas (LNG) sources have heating values higher than current North American natural gas pipelines can allow for. LNG from these cannot be injected into gas pipelines without several heating control processing steps. This paper outlines two new technologies developed to address this issue. The first is a power cogeneration process using LNG as a heat sink. The second technology involves a fractionation process removing Liquid Propane Gas (LPG) components from imported LNG, thereby controlling heat value. Both technologies are applicable in grassroots installations as well as being suitable for retrofitting to existing LNG regasification for power generation and LPG production. It was concluded that power cogeneration with a mixed fluid power cycle recovered a significant portion of energy in LNG liquefaction plants. Additionally, it was also possible to fractionate high quality LPG from LNG at a low cost, with the residue being further re-condensed and re-utilized for power generation. It was also concluded that the LNG fractionation process would add flexibility to the LNG receiving terminals, allowing the import of lower quality LNG to North America, while also generating additional revenues from LPG production. 3 refs., 5 tabs., 6 figs

  8. Nondestructive examination technologies for inspection of radioactive waste storage tanks

    International Nuclear Information System (INIS)

    Anderson, M.T.; Kunerth, D.C.; Davidson, J.R.

    1995-08-01

    The evaluation of underground radioactive waste storage tank structural integrity poses a unique set of challenges. Radiation fields, limited access, personnel safety and internal structures are just some of the problems faced. To examine the internal surfaces a sensor suite must be deployed as an end effector on a robotic arm. The purpose of this report is to examine the potential failure modes of the tanks, rank the viability of various NDE technologies for internal surface evaluation, select a technology for initial EE implementation, and project future needs for NDE EE sensor suites

  9. 100-N Area underground storage tank closures

    Energy Technology Data Exchange (ETDEWEB)

    Rowley, C.A.

    1993-08-01

    This report describes the removal/characterization actions concerning underground storage tanks (UST) at the 100-N Area. Included are 105-N-LFT, 182-N-1-DT, 182-N-2-DT, 182-N-3-DT, 100-N-SS-27, and 100-N-SS-28. The text of this report gives a summary of remedial activities. In addition, correspondence relating to UST closures can be found in Appendix B. Appendix C contains copies of Unusual Occurrence Reports, and validated sampling data results comprise Appendix D.

  10. 100-N Area underground storage tank closures

    International Nuclear Information System (INIS)

    Rowley, C.A.

    1993-01-01

    This report describes the removal/characterization actions concerning underground storage tanks (UST) at the 100-N Area. Included are 105-N-LFT, 182-N-1-DT, 182-N-2-DT, 182-N-3-DT, 100-N-SS-27, and 100-N-SS-28. The text of this report gives a summary of remedial activities. In addition, correspondence relating to UST closures can be found in Appendix B. Appendix C contains copies of Unusual Occurrence Reports, and validated sampling data results comprise Appendix D

  11. Review of Analytes of Concern and Sample Methods for Closure of DOE High Level Waste Storage Tanks

    International Nuclear Information System (INIS)

    Thomas, T.R.

    2002-01-01

    Sampling residual waste after tank cleaning and analysis for analytes of concern to support closure and cleaning targets of large underground tanks used for storage of legacy high level radioactive waste (HLW) at Department of Energy (DOE) sites has been underway since about 1995. The DOE Tanks Focus Area (TFA) has been working with DOE tank sites to develop new sampling plans, and sampling methods for assessment of residual waste inventories. This paper discusses regulatory analytes of concern, sampling plans, and sampling methods that support closure and cleaning target activities for large storage tanks at the Hanford Site, the Savannah River Site (SRS), the Idaho National Engineering and Environmental Laboratory (INEEL), and the West Valley Demonstration Project (WVDP)

  12. Water level response measurement in a steel cylindrical liquid storage tank using image filter processing under seismic excitation

    Science.gov (United States)

    Kim, Sung-Wan; Choi, Hyoung-Suk; Park, Dong-Uk; Baek, Eun-Rim; Kim, Jae-Min

    2018-02-01

    Sloshing refers to the movement of fluid that occurs when the kinetic energy of various storage tanks containing fluid (e.g., excitation and vibration) is continuously applied to the fluid inside the tanks. As the movement induced by an external force gets closer to the resonance frequency of the fluid, the effect of sloshing increases, and this can lead to a serious problem with the structural stability of the system. Thus, it is important to accurately understand the physics of sloshing, and to effectively suppress and reduce the sloshing. Also, a method for the economical measurement of the water level response of a liquid storage tank is needed for the exact analysis of sloshing. In this study, a method using images was employed among the methods for measuring the water level response of a liquid storage tank, and the water level response was measured using an image filter processing algorithm for the reduction of the noise of the fluid induced by light, and for the sharpening of the structure installed at the liquid storage tank. A shaking table test was performed to verify the validity of the method of measuring the water level response of a liquid storage tank using images, and the result was analyzed and compared with the response measured using a water level gauge.

  13. LNG links remote supplies and markets

    International Nuclear Information System (INIS)

    Avidan, A.A.; Gardner, R.E.; Nelson, D.; Borrelli, E.N.; Rethore, T.J.

    1997-01-01

    Liquefied natural gas (LNG) has established a niche for itself by matching remote gas supplies to markets that both lacked indigenous gas reserves and felt threatened in the aftermath of the energy crises of the 1970s and 1980s. It has provided a cost-effective energy source for these markets, while also offering an environmentally friendly fuel long before that was fashionable. The introduction of natural-gas use via LNG in the early years (mostly into France and Japan) has also allowed LNG to play a major role in developing gas infrastructure. Today, natural gas, often supplied as LNG, is particularly well-suited for use in the combined cycle technology used in independent power generation projects (IPPs). Today, LNG players cannot simply focus on monetizing gas resources. Instead, they must adapt their projects to meet the needs of changing markets. The impact of these changes on the LNG industry has been felt throughout the value chain from finding and producing gas, gas treatment, liquefaction, transport as a liquid, receiving terminals and regasification, and finally, to consumption by power producers, industrial users, and households. These factors have influenced the evolution of the LNG industry and have implications for the future of LNG, particularly in the context of worldwide natural gas

  14. Panel discussion: LNG's future in Asia

    International Nuclear Information System (INIS)

    Ohashi, Tadahiko

    1992-01-01

    The panelists convened to: (1) identify and evaluate the role which LNG is likely to play in the changing energy scene; (2) to examine the future supply and demand structure of the LNG trade; (3) to discover the key obstacles to continued growth in LNG trade; and (4) to find solutions to these problems. The panelists identified and outlined growing opportunities for LNG utilization in Asia during the next two decades. They shared the opinion that the structure of the supply and demand balance for LNG in Asia will shift during the next decade, providing considerable room for new projects. The key obstacles to continued growth in LNG trade are the lack of: long-distance transmission networks and an efficient competitive market pricing mechanism for LNG in the Asian region. The major importers in the region are keen on developing a range of new long-term supply alternatives, not simply within the Asia-Pacific region, but also from a wider perspective. These alternatives include: financing the expansion of production from existing facilities, development of new fields, and construction of long-distance pipelines

  15. Using virtual objects to aid underground storage tank teleoperation

    International Nuclear Information System (INIS)

    Anderson, R.J.; Davies, B.

    1994-01-01

    In this paper we describe an algorithm by which obstructions and surface features in an underground storage tank can be modeled and used to generate virtual barrier function for a real-time telerobotic system, which provides an aid to the operator for both real-time obstacle avoidance and for surface tracking. The algorithm requires that the slave's tool and every object in the waste storage tank be decomposed into convex polyhedral primitives, with the waste surface modeled by triangular prisms. Intrusion distance and extraction vectors are then derived at every time step by applying Gilbert's polyhedra distance algorithm, which has been adapted for the task. This information is then used to determine the compression and location of nonlinear virtual spring-dampers whose total force is summed and applied to the manipulator/teleoperator system. Experimental results using a PUMA 560 and a simulated waste surface validate the approach, showing that it is possible to compute the algorithm and generate smooth, realistic pseudo forces for the teleoperator system using standard VME bus hardware

  16. 40 CFR Table 1 to Subpart Bbbbbb... - Applicability Criteria, Emission Limits, and Management Practices for Storage Tanks

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 14 2010-07-01 2010-07-01 false Applicability Criteria, Emission Limits, and Management Practices for Storage Tanks 1 Table 1 to Subpart BBBBBB of Part 63 Protection of... Criteria, Emission Limits, and Management Practices for Storage Tanks If you own or operate Then you must 1...

  17. Global LNG - characteristics, clients and contracts

    International Nuclear Information System (INIS)

    Bauquis, P.R.

    1997-01-01

    Total's liquefied natural gas (LNG) holdings were described. Other topics discussed included an overview of gas consumption and internationally traded gas in 1995, a primer on the history of LNG, Japan's average import prices in 1996, Europe's border gas prices and consumption in 1995, Canada/US regional price differences in 1995 and 1996, and world gas markets and prices in 1996. The projected LNG supply and demand in Europe and Asia , especially in Japan, China and India, was also discussed. General concepts of LNG pricing, the general structure of a gas sales contract, and the different categories of LNG contracts were also reviewed. 24 figs

  18. The gas century: worldwide LNG developments may deal death blow to Alaskan pipeline dream

    International Nuclear Information System (INIS)

    Lorenz, A.

    2004-01-01

    The growing interest in liquefied natural gas (LNG), which casts doubt on the viability of the Alaska gas pipeline, and the potential impacts on Canadian gas exports to the United States are discussed. There is currently a proposal before Congress for an Alaskan LNG project, and consensus appears to be building among American energy experts and law-makers that building a multitude of LNG facilities would be more flexible and cheaper than building the proposed Alaska pipeline. As further proof of the growing popularity of LNG, U.S. industry lobbyists are said to be rapidly gaining congressional support for the idea of building eight to ten billion cubic feet per day of LNG capacity along the U. S. coast. Either development, -- LNG facilities or the Alaska pipeline -- have the potential to seriously impact Canadian natural gas exports. If the Alaska pipeline is built, the addition of five billion cubic feet per day of new gas on the market would cause gas prices to fall; if the U.S. decides to subsidize its gas industry, Canadian gas would be put at a serious disadvantage. Conversely, if the Alaskan LNG proposal were to succeed, the potential demise of the Alaska pipeline would mean the loss of about 12,000 jobs that would be created during the Canadian construction phase of the pipeline, as well as the loss of tariffs. Industry experts predict that by 2005 LNG terminals will dot the periphery of the U. S. coast line; to prepare for these eventualities, Canadian companies, such as Irving Oil, TransCanada Pipelines and EnCana are taking note, and are scrambling not to be left out of the game. As proof of the seriousness of their concern, Irving Oil is adding a Can$500 million LNG facility to its Canaport terminal on the Scotian shelf; TCPL is working to supply an LNG terminal offshore Massachusetts, and EnCana is refurbishing a Louisiana salt cavern to prepare for storage of gas delivered to the Gulf Coast

  19. The Malaysia LNG experience

    International Nuclear Information System (INIS)

    Muhammed, M.

    1991-01-01

    This paper summarizes the nature of the LNG trade, the essential components and characteristics of an LNG project, and relates the Malaysia LNG experience to project realization with some emphasis on the financial aspects of the project. Twelve offshore lending institutions were involved in the total project loop providing U.S. dollar equivalents of 4.0 billions with interest rates ranging from 5% to 8%. The total project was completed on schedule and within budget except for the ships which got caught in the political development of the Malaysian petroleum industry at that time

  20. Innovative tank emptying system for the retrieval of salt, sludge and IX resins from storage tanks of NPPs

    International Nuclear Information System (INIS)

    Karl Froschauer; Holger Witing; Bernhard Christ

    2006-01-01

    RWE NUKEM recently developed a new Tank Emptying System (TESY) for the extraction of stored radioactive boric acid/borate salt blocks, sludge and IX resin from NPP stainless steel tanks of several hundred cubic meters content in Russia. RWE NUKEM has chosen the emptying concept consisting of a tracked submersible vehicle ('Crawler'), with jet nozzles for solution, agitation and fluidization, and a suction head to pick up the generated solution or suspension respectively. With the employment of RWE NUKEM's TESY system, spent radioactive salt deposits, ion-exchange resins and sludge, can be emptied and transferred out of the tank. The sediment, crystallized and settled during storage, will be agitated with increased temperature and suitable pH value and then picked up in form of a suspension or solution directly at the point of mobilization. This new Tank Emptying System concept enables efficiently to retrieve stored salt and other sediment waste, reduces operating time, safes cost for spare parts, increases the safety of operation and minimizes radiation exposure to personnel. All emptying tasks are performed remotely from a panel board and TV monitor located in a central control room. The TESY system consists of the following main components: glove box, crawler, submersible pump, heater, TV camera and spot light, control panel and monitor, water separation and feed unit, sodium hydroxide dosing unit. The system is specially requested for the removal of more than 2,500 cubic meter salt solution generated from the dissolution of some 300 cubic meter crystallized salt deposit per tank and per year. The TESY system is able to dissolve efficiently the salts and retrieve solutions and other liquefied suspensions. TESY is adaptable to all liquid waste storage facilities and especially deployable for tanks with limited access openings (<550 mm)

  1. 77 FR 73627 - 2012 LNG Export Study

    Science.gov (United States)

    2012-12-11

    ... DEPARTMENT OF ENERGY 2012 LNG Export Study AGENCY: Office of Fossil Energy, Department of Energy. ACTION: Notice of availability of 2012 LNG Export Study and request for comments. Freeport LNG Expansion, L.P. [FE Docket No. 10-161-LNG] and FLNG Liquefaction, LLC. Lake Charles Exports, LLC.... [FE Docket...

  2. Modification of a liquid hydrogen tank for integrated refrigeration and storage

    Science.gov (United States)

    Swanger, A. M.; Jumper, K. M.; Fesmire, J. E.; Notardonato, W. U.

    2015-12-01

    The modification and outfitting of a 125,000-liter liquid hydrogen tank was performed to provide integrated refrigeration and storage capability. These functions include zero boil-off, liquefaction, and densification and therefore require provisions for sub-atmospheric tank pressures within the vacuum-jacketed, multilayer insulated tank. The primary structural modification was to add stiffening rings inside the inner vessel. The internal stiffening rings were designed, built, and installed per the ASME Boiler and Pressure Vessel Code, Section VIII, to prevent collapse in the case of vacuum jacket failure in combination with sub-atmospheric pressure within the tank. For the integrated refrigeration loop, a modular, skeleton-type heat exchanger, with refrigerant temperature instrumentation, was constructed using the stiffening rings as supports. To support the system thermal performance testing, three custom temperature rakes were designed and installed along the 21-meter length of the tank, once again using rings as supports. The temperature rakes included a total of 20 silicon diode temperature sensors mounted both vertically and radially to map the bulk liquid temperature within the tank. The tank modifications were successful and the system is now operational for the research and development of integrated refrigeration technology.

  3. Preliminary study of acoustic emission (ae) noise signal identification for crude oil storage tank

    International Nuclear Information System (INIS)

    Nurul Ain Ahmad Latif; Shukri Mohd

    2008-08-01

    This preliminary work was carried out to simulate the Acoustic Emission (AE) signal contributed by pitting corrosion, and noise signal from environment during crude oil storage tanks monitoring. The purpose of this study is to prove that acoustic emission (AE) could be used to detect the formation of pitting corrosion in the crude oil storage tank and differentiated it from other sources of noise signal. In this study, the pitting corrosion was simulated by inducing low voltage and low amperage current onto the crude oil storage tank material (ASTM 516 G 70). Water drop, air blow and surface rubbing were applied onto the specimen surface. To simulate the noise signal produce by rain fall, wind blow and other sources of noise during AE crude oil storage tanks monitoring. AE sensor was attached onto the other surface of specimen to acquire all of these AE signals which then has send to AE DiSP 24 data acquisition system for signal conditioning. AE win software has been used to analyse this entire signal. It is found that, simulated pitting corrosion could be detected by AE system and differentiated from other sources of noise by using amplitude analysis. From the amplitude analysis is shown that 20-30 dB is the range amplitude for the blow test, 50-60 dB for surface rubbing test and over than 60 dB for water drop test. (Author)

  4. Oak Ridge National Laboratory Melton Valley Storage Tanks Waste filtration process evaluation

    International Nuclear Information System (INIS)

    Walker, B.W.; McCabe, D.J.

    1997-01-01

    The purpose of this filter study was to evaluate cross-flow filtration as effective solid-liquid separation technology for treating Oak Ridge National Laboratory wastes, outline operating conditions for equipment, examine the expected filter flow rates, and determine proper cleaning.The Gunite Tanks at the Oak Ridge National Laboratory contain heels which are a mixture of sludge, wash water, and bentonite clay. The tanks are to be cleaned out with a variety of flushing techniques and the dilute mixture transferred to another storage tank. One proposal is to transfer this mixture into existing Melton Valley Storage Tanks (MVST), which already contain a large amount of sludge and supernate. The mixed aqueous phase will then be transferred to new MVST, which are prohibited from containing insoluble solids. To separate the solid from the liquid and thereby prevent solids transfer into the new MVST, a technique is needed that can cleanly separate the sludge and bentonite clay from the supernate. One proposed method for solid liquid separation is cross-flow filtration. Cross-flow filtration has been used at the Savannah River and West Valley sites for treatment of tank waste, and is being tested for applicability at other sites. The performance of cross-flow filters with sludge has been tested, but the impact of sludge combined with bentonite clay has not. The objective of this test was to evaluate the feasibility of using cross-flow filters to perform the solid liquid separation required for the mixture of Gunite and MVST tank wastes

  5. Arctic Islands LNG

    Energy Technology Data Exchange (ETDEWEB)

    Hindle, W.

    1977-01-01

    Trans-Canada Pipe Lines Ltd. made a feasibility study of transporting LNG from the High Arctic Islands to a St. Lawrence River Terminal by means of a specially designed and built 125,000 cu m or 165,000 cu m icebreaking LNG tanker. Studies were made of the climatology and of ice conditions, using available statistical data as well as direct surveys in 1974, 1975, and 1976. For on-schedule and unimpeded (unescorted) passage of the LNG carriers at all times of the year, special navigation and communications systems can be made available. Available icebreaking experience, charting for the proposed tanker routes, and tide tables for the Canadian Arctic were surveyed. Preliminary design of a proposed Arctic LNG icebreaker tanker, including containment system, reliquefaction of boiloff, speed, power, number of trips for 345 day/yr operation, and liquefaction and regasification facilities are discussed. The use of a minimum of three Arctic Class 10 ships would enable delivery of volumes of natural gas averaging 11.3 million cu m/day over a period of a year to Canadian markets. The concept appears to be technically feasible with existing basic technology.

  6. Regulatory analysis of the Underground Storage Tank-Integrated Demonstration Program

    International Nuclear Information System (INIS)

    Smith, E.H.

    1992-01-01

    The Underground Storage Tank-Integrated Demonstration (UST-ID) Program has been developed to identify, demonstrate, test, and evaluate technologies that will provide alternatives to the current underground storage tank remediation program. The UST-ID Program is a national program that consists of five participating US Department of Energy (DOE) sites where technologies can be developed an ultimately demonstrated. Once these technologies are demonstrated, the UST-ID Program will transfer the developed technology system to industry (governmental or industrial) for application or back to Research and Development for further evaluation and modification, as necessary. In order to ensure that the UST-ID Program proceeds without interruption, it will be necessary to identify regulatory requirements along with associated permitting and notification requirements early in the technology development process. This document serves as a baseline for identifying certain federal and state regulatory requirements that may impact the UST-ID Program and the demonstration of any identified technologies

  7. Cathodic Protection for Above Ground Storage Tank Bottom Using Data Acquisition

    Directory of Open Access Journals (Sweden)

    Naseer Abbood Issa Al Haboubi

    2015-07-01

    Full Text Available Impressed current cathodic protection controlled by computer gives the ideal solution to the changes in environmental factors and long term coating degradation. The protection potential distribution achieved and the current demand on the anode can be regulated to protection criteria, to achieve the effective protection for the system. In this paper, cathodic protection problem of above ground steel storage tank was investigated by an impressed current of cathodic protection with controlled potential of electrical system to manage the variation in soil resistivity. Corrosion controller has been implemented for above ground tank in LabView where tank's bottom potential to soil was manipulated to the desired set point (protection criterion 850 mV. National Instruments Data Acquisition (NI-DAQ and PC controllers for tank corrosion control system provides quick response to achieve steady state condition for any kind of disturbances.

  8. Behaviour of ruthenium in the case of shutdown of the cooling system of HLLW storage tanks

    International Nuclear Information System (INIS)

    Philippe, M.; Gue, J.P.; Mercier, J.P.

    1990-12-01

    The consequences of the failure of the cooling system of fission product storage tanks over a variable period were investigated as part of the safety analysis of the La Hague spent fuel reprocessing plant. Due to the considerable heat release, induced by the fission products, a prolonged shutdown of the tank cooling system could cause the progressive evaporation of the solutions to dryness, and culminate in the formation of volatile species of ruthenium and their release in the tank venting circuit. To determine the fraction of ruthenium likely to be transferred from the storage tanks in volatile or aerosol form during the failure, evaporation tests were conducted by evaporating samples of actual nitric acid solutions of fission products, obtained on the laboratory scale after the reprocessing of several kilograms of MOX fuels irradiated to 30.000 MW day ·t -1 . A distillation apparatus was designed to operate with small-volume solution samples, reproducing the heating conditions existing in the reprocessing plant within a storage tank for fission products. The main conclusions drawn from these experiments are as follows: - ruthenium is only volatilized in the final phase of evaporation, just before desiccation, - for a final temperature limited to 160 deg. C, the total fraction of volatilized ruthenium reaches 12%, - in the presence of H 2 O, HNO 3 , NO x and O 2 , the volatilized ruthenium recombines mainly in the form of ruthenium nitrosyl nitrates, or decomposes into ruthenium oxide (probably RuO 2 ) on the walls of the apparatus. Assuming a heating power density of 10 W/liter of concentrate, and a perfectly adiabatic storage system, the minimum time required to reach dryness can be estimated at 90 h, allowing substantial time to take action to restore a cooling source. It is probable that, in an industrial storage tank, the heat losses from the tank and the offgas discharge ducts will cause recondensation and internal reflux, which will commensurately delay

  9. Feasibility of applying cathodic protection to double-wall waste storage tanks

    International Nuclear Information System (INIS)

    Moore, E.L.

    1977-01-01

    A study was conducted to determine the feasibility of applying impressed current cathodic protection to double-wall storage tanks containing terminal waste solutions. Norton Corrosion Limited concluded that such a system could be designed for installation on the tanks. Under their direction, Battelle Northwest Laboratories conducted a laboratory study to develop necessary data for design of the system. A separate study conducted by Battelle Columbus Laboratories indicated that, while terminal waste solutions by themselves do not promote stress corrosion cracking, cathodic protection may promote this type of corrosion under certain conditions. As a result of these findings, the recommendation was made not to install cathodic protection on the double-wall tanks containing terminal waste solutions

  10. On the Behavior of Different PCMs in a Hot Water Storage Tank against Thermal Demands.

    Science.gov (United States)

    Porteiro, Jacobo; Míguez, José Luis; Crespo, Bárbara; de Lara, José; Pousada, José María

    2016-03-21

    Advantages, such as thermal storage improvement, are found when using PCMs (Phase Change Materials) in storage tanks. The inclusion of three different types of materials in a 60 l test tank is studied. Two test methodologies were developed, and four tests were performed following each methodology. A thermal analysis is performed to check the thermal properties of each PCM. The distributions of the water temperatures inside the test tanks are evaluated by installing four Pt-100 sensors at different heights. A temperature recovery is observed after exposing the test tank to an energy demand. An energetic analysis that takes into account the energy due to the water temperature, the energy due to the PCM and the thermal loss to the ambient environment is also presented. The percentage of each PCM that remains in the liquid state after the energy demand is obtained.

  11. Characterization and leaching study of sludge from Melton Valley Storage Tank W-25

    International Nuclear Information System (INIS)

    Collins, J.L.; Egan, B.Z.; Beahm, E.C.; Chase, C.W.; Anderson, K.K.

    1997-08-01

    One of the greatest challenges facing the Department of Energy (DOE) is the remediation of the 100 million gallons of high-level and low-level radioactive waste in the underground storage tanks at its Hanford, Savannah River, Oak Ridge, Idaho, and Fernald sites. Bench-scale batch tests have been conducted with sludge from the Melton Valley Storage Tank (MVST) Facility at Oak Ridge National Laboratory (ORNL) to evaluate separation processes for use in a comprehensive sludge-processing flow sheet for concentrating the radionuclides and reducing the volumes of storage tanks wastes for final disposal. This report discusses the hot cell apparatus, the characterization of the sludge, and the results obtained from a variety of basic and acidic leaching tests of samples of sludge. Approximately 5 L of sludge/supernate from MVST W-25 was retrieved and transferred to a stainless steel tank for mixing and storage in a hot cell. Samples were centrifuged to separate the sludge liquid and the sludge solids. Air-dried samples of sludge were analyzed to determine the concentrations of radionuclides, other metals, and anions. Based upon the air-dried weight, about 41% of the centrifuged, wet sludge solids was water. The major alpha-, gamma-, and beta-emitting radionuclides in the centrifuged, wet sludge solids were 137 Cs, 60 Co, 154 Eu, 241 Am, 244 Cm, 90 Sr, Pu, U, and Th. The other major metals (in addition to the U and Th) and the anions were Na, Ca, Al, K, Mg, NO 3 - , CO 3 2- , OH - , and O 2- . The organic carbon content was 3.0 ± 1.0%. The pH was 13

  12. Radiation exposure rate and liquid level measurement inside a high level liquid waste (HLLW) storage tank

    International Nuclear Information System (INIS)

    Sur, B.; Yue, S.; Thekkevarriam, A.

    2007-01-01

    An instrument based on an inexpensive, small silicon diode has been developed and used to measure, for the first time, the gamma radiation exposure rate profile inside a 6.4 mm diameter reentrant thermo-well tube, immersed in the highly radioactive liquid solution in an HLLW storage tank. The measurement agrees with previous calculations of exposure rate, and provides confirmation for safe and effective radiation work plans and material selection for investigations and remediation of the storage tank facility. The measured radiation exposure rate profile is also used to confirm that the position of tank internal structures have not changed because of aging and corrosion, and to obtain, within a few mm, the level of liquid inside the tank. (author)

  13. Safety of atmospheric storage tanks during accidental explosions

    OpenAIRE

    Noret , E.; Prod'Homme , Gaëtan; Yalamas , Thierry; Reimeringer , Mathieu; Hanus , Jean-Luc; Duong , Duy-Hung

    2012-01-01

    International audience; The occurrence of a chain reaction from blast on atmospheric storage tanks in oil and chemical facilities is hard to predict. The current French practice for SEVESO facilities ignores projectiles and assumes a critical peak overpressure value observed from accident data. This method could lead to conservative or dangerous assessments. This study presents various simple mechanical models to facilitate quick effective assessment of risk analysis, the results of which are...

  14. Acoustic imaging of underground storage tank wastes: A feasibility study. Final report

    International Nuclear Information System (INIS)

    Turpening, R.; Zhu, Z.; Caravana, C.; Matarese, J.

    1995-01-01

    The objectives for this underground storage tank (UST) imaging investigation are: (1) to assess the feasibility of using acoustic methods in UST wastes, if shown to be feasible, develop and assess imaging strategies; (2) to assess the validity of using chemical simulants for the development of acoustic methods and equipment. This investigation examined the velocity of surrogates, both salt cake and sludge surrogates. In addition collected seismic cross well data in a real tank (114-TX) on the Hanford Reservation. Lastly, drawing on the knowledge of the simulants and the estimates of the velocities of the waste in tank 114-TX the authors generated a hypothetical model of waste in a tank and showed that non-linear travel time tomographic imaging would faithfully image that stratigraphy

  15. Simplified design and evaluation of liquid storage tanks relative to earthquake loading

    Energy Technology Data Exchange (ETDEWEB)

    Poole, A.B.

    1994-06-01

    A summary of earthquake-induced damage in liquid storage tanks is provided. The general analysis steps for dynamic response of fluid-filled tanks subject to horizontal ground excitation are discussed. This work will provide major attention to the understanding of observed tank-failure modes. These modes are quite diverse in nature, but many of the commonly appearing patterns are believed to be shell buckling. A generalized and simple-to-apply shell loading will be developed using Fluegge shell theory. The input to this simplified analysis will be horizontal ground acceleration and tank shell form parameters. A dimensionless parameter will be developed and used in predictions of buckling resulting from earthquake-imposed loads. This prediction method will be applied to various tank designs that have failed during major earthquakes and during shaker table tests. Tanks that have not failed will also be reviewed. A simplified approach will be discussed for early design and evaluation of tank shell parameters and materials to provide a high confidence of low probability of failure during earthquakes.

  16. Inspection and repair of storage tank bottoms and foundations using airbag lifting

    International Nuclear Information System (INIS)

    Wildin, I.P.; Adams, N.J.

    1992-01-01

    This paper reports that within the past five years the environmental impact on the operation of petro-chemical product storage tanks, constructed to standards such as API 650, has taken on critical implications for refineries and distribution centers. Pollution of the supporting foundation and possible widespread effects on ground water has resulted in moves to require the installation of double integrity bottoms. That is not to say, necessarily, a tank with two steel bottoms, but alternative means of reducing the failure probability to an acceptable public or statutory level. Clearly increased inspection of the tank bottom has merit and visual examination of the bottom from inside the tank can be supplemented by ultrasonic methods, acoustic leak detection and magnetic flux scanning. Tank lifting now offers a very cost effective method for underfloor inspection, combined with the opportunity to undertake repairs to the bottom and underside painting, together with improvements and repairs to the Bitsand surface of the tank pad. if necessary, an impervious membrane can also be installed with a leak detection trough formed around the tank edge

  17. 49 CFR 193.2155 - Structural requirements.

    Science.gov (United States)

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES... train, tank car, or tank truck that could reasonably be expected to cause the most severe loading. (b) An LNG storage tank must not be located within a horizontal distance of one mile (1.6 km) from the...

  18. Standard practice for examination of liquid-Filled atmospheric and Low-pressure metal storage tanks using acoustic emission

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2007-01-01

    1.1 This practice covers guidelines for acoustic emission (AE) examinations of new and in-service aboveground storage tanks of the type used for storage of liquids. 1.2 This practice will detect acoustic emission in areas of sensor coverage that are stressed during the course of the examination. For flat-bottom tanks these areas will generally include the sidewalls (and roof if pressure is applied above the liquid level). The examination may not detect flaws on the bottom of flat-bottom tanks unless sensors are located on the bottom. 1.3 This practice may require that the tank experience a load that is greater than that encountered in normal use. The normal contents of the tank can usually be used for applying this load. 1.4 This practice is not valid for tanks that will be operated at a pressure greater than the examination pressure. 1.5 It is not necessary to drain or clean the tank before performing this examination. 1.6 This practice applies to tanks made of carbon steel, stainless steel, aluminum and oth...

  19. The LNG Industry - 2013

    International Nuclear Information System (INIS)

    Dispenza, Domenico

    2014-04-01

    In 2013 the LNG markets remained extremely tight due to the demand pull from nuclear closures in Japan and South Korea and the difficulties to ramp-up production of new facilities in Angola and Algeria, bringing LNG price levels in the Far East to record highs in the first quarter. In addition to Cheniere's Sabine Pass, three new liquefaction projects received full approvals in the U.S.A. last year, confirming the country's path to become the world's third largest LNG exporter by the end of the decade. Cameron joined their ranks in early 2014 so that at the time of this writing, a total 62.5 Mt/y of capacity have been approved to export to non-FTA countries by the Department of Energy, already impacting the LNG industry, if not in physical volume then in contracting strategy. 2013 could be considered a transition year. LNG traded volumes as a whole remained at the same level as in 2012, but new trade patterns seem to emerge. The past year may have seen a slowdown in the number of FIDs, counting only one greenfield (Yamal LNG) and two expansion projects, but not in capacity increase with a respectable 29 Mt/y committed in total. Demand remained strong in Asia, mainly in China and South Korea. In Japan, imports continued to increase, although more moderately in a response to high prices and the yen devaluation, shifting the energy mix towards other sources of energy. Demand also increased in South America, strongly related to weather factors. Europe remained the swing provider to the world's LNG market. In a context of depressed local demand and with the utilization rate of the re-gasification terminals in their region at a historical low, European players continued with innovative transactions in search for business (such as re-loadings, two-port loadings, ship-to-ship transfers) while developing new markets for LNG as a transportation fuel. Three new countries joined the ranks of LNG importers in 2013: Israel, Malaysia, and Singapore. Total

  20. Cleanout of waste storage tanks at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Weeren, H.O.; Lasher, L.C.; McDaniel, E.W.

    1984-01-01

    In 1943, six storage tanks were built at the Clinton Laboratories [later to become Oak Ridge National Laboratory (ORNL)] to contain wastes generated by wartime research and development operations. During the following years, these tanks became an integral part of the ORNL waste system and accumulated approx. 1.5 x 10 6 L (400,000 gal) of sludge containing radioactive wastes. Recently, over a period of approx. 18 months, these tanks were sluiced, the radioactive sludge resuspended, and the resuspended slurry pumped to the ORNL Hydrofracture Facility for underground disposal. In this paper, a summary of the development work is given, and the process design and constraints are described. The operating difficulties encountered and overcome included grinder blade erosion, malfunctioning instruments, pump suction plugging, and slurry settling. About 90% of the settled sludge (containing approx. 715,000 Ci) was removed from the system

  1. 18 CFR 1304.405 - Fuel storage tanks and handling facilities.

    Science.gov (United States)

    2010-04-01

    ... used to contain a regulated substance (such as a petroleum product) and has 10 percent or more of its... or remedy pollution or violations of law, including removal of the UST system, with costs charged to... flammable and combustible liquids storage tanks at marine service stations. (d) Fuel handling on private...

  2. Thermoeconomic analysis of storage systems for solar heating and cooling systems: A comparison between variable-volume and fixed-volume tanks

    International Nuclear Information System (INIS)

    Buonomano, Annamaria; Calise, Francesco; Ferruzzi, Gabriele

    2013-01-01

    The paper investigates different control strategies for the thermal storage management in SHC (Solar Heating and Cooling) systems. The SHC system under investigation is based on a field of evacuated solar collectors coupled with a single-stage LiBr–H 2 O absorption chiller; auxiliary thermal energy is supplied by a gas-fired boiler. The SHC is also equipped with a novel thermal storage system, consisting in a variable volume storage tank. It includes three separate tanks and a number of mixers and diverters managed by novel control strategies, based on combinations of series/parallel charging and discharging approaches. The aim of this component is to vary the thermal storage capacity as a function of the combinations of solar radiation availability and user thermal/cooling energy demands. The system allows one to increase the number of active tanks when the time shift between solar energy and user demand is high. Conversely, when this time shift is low, the number of active tanks is automatically reduced. In addition, when the solar energy in excess cannot be stored in such tanks, a heat exchanger is also used in the solar loop for producing DHW (Domestic Hot Water). The analysis is carried out by means of a zero-dimensional transient simulation model, developed by using the TRNSYS software. In order to assess the operating and capital costs of the systems under analysis, an economic model is also proposed. In addition, in order to determine the set of the synthesis/design variables which maximize the system profitability, a parametric analysis was implemented. The novel variable-volume storage system, in both the proposed configurations, was also compared with a constant-volume storage system from the energy and economic points of view. The results showed that the presented storage system allows one to save up to 20% of the natural gas used by the auxiliary boiler only for very high solar fractions. In all the other cases, marginal savings are achieved by the

  3. Pump-to-Wheels Methane Emissions from the Heavy-Duty Transportation Sector.

    Science.gov (United States)

    Clark, Nigel N; McKain, David L; Johnson, Derek R; Wayne, W Scott; Li, Hailin; Akkerman, Vyacheslav; Sandoval, Cesar; Covington, April N; Mongold, Ronald A; Hailer, John T; Ugarte, Orlando J

    2017-01-17

    Pump-to-wheels (PTW) methane emissions from the heavy-duty (HD) transportation sector, which have climate change implications, are poorly documented. In this study, methane emissions from HD natural gas fueled vehicles and the compressed natural gas (CNG) and liquefied natural gas (LNG) fueling stations that serve them were characterized. A novel measurement system was developed to quantify methane leaks and losses. Engine related emissions were characterized from twenty-two natural gas fueled transit buses, refuse trucks, and over-the-road (OTR) tractors. Losses from six LNG and eight CNG stations were characterized during compression, fuel delivery, storage, and from leaks. Cryogenic boil-off pressure rise and pressure control venting from LNG storage tanks were characterized using theoretical and empirical modeling. Field and laboratory observations of LNG storage tanks were used for model development and evaluation. PTW emissions were combined with a specific scenario to view emissions as a percent of throughput. Vehicle tailpipe and crankcase emissions were the highest sources of methane. Data from this research are being applied by the authors to develop models to forecast methane emissions from the future HD transportation sector.

  4. Implications of the modelling of stratified hot water storage tanks in the simulation of CHP plants

    Energy Technology Data Exchange (ETDEWEB)

    Campos Celador, A., E-mail: alvaro.campos@ehu.es [ENEDI Research Group-University of the Basque Country, Departamento de Maquinas y Motores Termicos, E.T.S.I. de Bilbao Alameda de Urquijo, s/n 48013 Bilbao, Bizkaia (Spain); Odriozola, M.; Sala, J.M. [ENEDI Research Group-University of the Basque Country, Departamento de Maquinas y Motores Termicos, E.T.S.I. de Bilbao Alameda de Urquijo, s/n 48013 Bilbao, Bizkaia (Spain)

    2011-08-15

    Highlights: {yields} Three different modelling approaches for simulation of hot water tanks are presented. {yields} The three models are simulated within a residential cogeneration plant. {yields} Small differences in the results are found by an energy and exergy analysis. {yields} Big differences between the results are found by an advanced exergy analysis. {yields} Results on the feasibility study are explained by the advanced exergy analysis. - Abstract: This paper considers the effect that different hot water storage tank modelling approaches have on the global simulation of residential CHP plants as well as their impact on their economic feasibility. While a simplified assessment of the heat storage is usually considered in the feasibility studies of CHP plants in buildings, this paper deals with three different levels of modelling of the hot water tank: actual stratified model, ideal stratified model and fully mixed model. These three approaches are presented and comparatively evaluated under the same case of study, a cogeneration plant with thermal storage meeting the loads of an urbanisation located in the Bilbao metropolitan area (Spain). The case of study is simulated by TRNSYS for each one of the three modelling cases and the so obtained annual results are analysed from both a First and Second-Law-based viewpoint. While the global energy and exergy efficiencies of the plant for the three modelling cases agree quite well, important differences are found between the economic results of the feasibility study. These results can be predicted by means of an advanced exergy analysis of the storage tank considering the endogenous and exogenous exergy destruction terms caused by the hot water storage tank.

  5. Seismic design and evaluation guidelines for the Department of Energy high-level waste storage tanks and appurtenances

    International Nuclear Information System (INIS)

    Bandyopadhyay, K.; Cornell, A.; Costantino, C.; Kennedy, R.; Miller, C.; Veletsos, A.

    1993-01-01

    This document provides guidelines for the design and evaluation of underground high-level waste storage tanks due to seismic loads. Attempts were made to reflect the knowledge acquired in the last two decades in the areas of defining the ground motion and calculating hydrodynamic loads and dynamic soil pressures for underground tank structures. The application of the analysis approach is illustrated with an example. The guidelines are developed for specific design of underground storage tanks, namely double-shell structures. However, the methodology discussed is applicable for other types of tank structures as well. The application of these and of suitably adjusted versions of these concepts to other structural types will be addressed in a future version of this document

  6. On the Behavior of Different PCMs in a Hot Water Storage Tank against Thermal Demands

    Directory of Open Access Journals (Sweden)

    Jacobo Porteiro

    2016-03-01

    Full Text Available Advantages, such as thermal storage improvement, are found when using PCMs (Phase Change Materials in storage tanks. The inclusion of three different types of materials in a 60 l test tank is studied. Two test methodologies were developed, and four tests were performed following each methodology. A thermal analysis is performed to check the thermal properties of each PCM. The distributions of the water temperatures inside the test tanks are evaluated by installing four Pt-100 sensors at different heights. A temperature recovery is observed after exposing the test tank to an energy demand. An energetic analysis that takes into account the energy due to the water temperature, the energy due to the PCM and the thermal loss to the ambient environment is also presented. The percentage of each PCM that remains in the liquid state after the energy demand is obtained.

  7. Effect of the foundation stiffness on the response of a seismically isolated tank under SSE conditions

    NARCIS (Netherlands)

    Esposito, G.; Courage, W.

    2003-01-01

    This paper presents the results of a feasibility study of a seismic isolated 120.000 m3 LNG tank. A simple model was used to evaluate the seismic response of the isolated tank under Safe Shutdown Earthquake conditions. The frequency dependent dynamic stiffness of the foundation was

  8. LNG's renaissance in the U.S. -- why now?

    International Nuclear Information System (INIS)

    Moore, J.

    2000-01-01

    The present state and future prospects for the U.S. liquefied natural gas industry are reviewed in light of expanding opportunities for LNG export worldwide. An update on new tanker ships to transport LNG by both exporters and importers and on developments at US LNG facilities at Everett, MA, Cove Point, MD, Elba Island, GA, and at Lake Charles, LA, is provided, along with an assessment of East Coast supply sources and demand forecast. The prediction is that worldwide supply/demand for LNG will tighten, that US prices will be strong enough to support LNG, that proposed expansion of LNG liquefaction facilities in the Atlantic Basin will fill US import facilities, and that East Coast demand growth will absorb growth in LNG imports

  9. Characterization and leaching study of sludge from Melton Valley Storage Tank W-25

    Energy Technology Data Exchange (ETDEWEB)

    Collins, J.L.; Egan, B.Z.; Beahm, E.C.; Chase, C.W.; Anderson, K.K.

    1997-08-01

    One of the greatest challenges facing the Department of Energy (DOE) is the remediation of the 100 million gallons of high-level and low-level radioactive waste in the underground storage tanks at its Hanford, Savannah River, Oak Ridge, Idaho, and Fernald sites. Bench-scale batch tests have been conducted with sludge from the Melton Valley Storage Tank (MVST) Facility at Oak Ridge National Laboratory (ORNL) to evaluate separation processes for use in a comprehensive sludge-processing flow sheet for concentrating the radionuclides and reducing the volumes of storage tanks wastes for final disposal. This report discusses the hot cell apparatus, the characterization of the sludge, and the results obtained from a variety of basic and acidic leaching tests of samples of sludge. Approximately 5 L of sludge/supernate from MVST W-25 was retrieved and transferred to a stainless steel tank for mixing and storage in a hot cell. Samples were centrifuged to separate the sludge liquid and the sludge solids. Air-dried samples of sludge were analyzed to determine the concentrations of radionuclides, other metals, and anions. Based upon the air-dried weight, about 41% of the centrifuged, wet sludge solids was water. The major alpha-, gamma-, and beta-emitting radionuclides in the centrifuged, wet sludge solids were {sup 137}Cs, {sup 60}Co, {sup 154}Eu, {sup 241}Am, {sup 244}Cm, {sup 90}Sr, Pu, U, and Th. The other major metals (in addition to the U and Th) and the anions were Na, Ca, Al, K, Mg, NO{sub 3}{sup {minus}}, CO{sub 3}{sup 2{minus}}, OH{sup {minus}}, and O{sub 2{minus}}. The organic carbon content was 3.0 {+-} 1.0%. The pH was 13.

  10. Financial structure of Korea Gas Corporation's LNG projects

    International Nuclear Information System (INIS)

    Jeongsoo Ko

    1991-01-01

    When an Indonesian LNG tanker arrived in Korea for the first time in October 1986, Korea became the seventh LNG-consuming nation in the world. The imported LNG has contributed greatly to solving pollution problems and ensuring a stable supply of energy to Korea through the diversification of energy sources. So far, the LNG supply has been confined to the Metropolitan area. The Korea Gas Corporation now plans to expand the LNG supply to cover the entire nation. This paper introduces the experience and future plan of Korea's LNG projects with a special reference to their financial structure

  11. Cathodic protection simulation of above ground storage tank bottom: Experimental and numerical results

    Energy Technology Data Exchange (ETDEWEB)

    Schultz, Marcelo [Inspection Department, Rio de Janeiro Refinery - REDUC, Petrobras, Rio de Janeiro (Brazil); Brasil, Simone L.D.C. [Chemistry School, Federal University of Rio de Janeiro, UFRJ, Rio de Janeiro (Brazil); Baptista, Walmar [Corrosion Department, Research Centre - CENPES, Petrobras (Brazil); Miranda, Luiz de [Materials and Metallurgical Engineering Program, COPPE, UFRJ, Rio de Janeiro (Brazil); Brito, Rosane F. [Corrosion Department, Research Centre, CENPES, Petrobras, Rio de Janeiro (Brazil)

    2004-07-01

    The deterioration history of Above ground Storage Tanks (AST) of Petrobras' refineries - shows that the great incidence of corrosion in the AST bottom is at the external side. This is a problem in the disposability of storage crude oil and other final products. At this refinery, all AST's are built over a concrete base with a lot of pile to support the structure and distribute the charge homogeneously. Because of this it is very difficult to use cathodic protection as an anti-corrosive method for each one of these tanks. This work presents an alternative cathodic protection system to protect the external side of the tank bottom using a new metallic bottom, placed at different distance from the original one. The space between the two bottoms was filled with one of two kinds of soils, sand or clay, more conductive than the concrete. Using a prototype tank it was studied the potential distributions over the new tank bottom for different system parameters, as soil resistivity, number and position of anodes localized in the old bottom. These experimental results were compared to numerical simulations, carried out using a software based on the Boundary Element Method. The computer simulation validates this protection method, confirming to be a very useful tool to define the optimized cathodic protection system configuration. (authors)

  12. LNG plant combined with power plant

    Energy Technology Data Exchange (ETDEWEB)

    Aoki, I; Kikkawa, Y [Chiyoda Chemical Engineering and Construction Co. Ltd., Tokyo (Japan)

    1997-06-01

    The LNG plant consumers a lot of power of natural gas cooling and liquefaction. In some LNG plant location, a rapid growth of electric power demand is expected due to the modernization of area and/or the country. The electric power demand will have a peak in day time and low consumption in night time, while the power demand of the LNG plant is almost constant due to its nature. Combining the LNG plant with power plant will contribute an improvement the thermal efficiency of the power plant by keeping higher average load of the power plant, which will lead to a reduction of electrical power generation cost. The sweet fuel gas to the power plant can be extracted from the LNG plant, which will be favorable from view point of clean air of the area. (Author). 5 figs.

  13. LNG plant combined with power plant

    International Nuclear Information System (INIS)

    Aoki, I.; Kikkawa, Y.

    1997-01-01

    The LNG plant consumers a lot of power of natural gas cooling and liquefaction. In some LNG plant location, a rapid growth of electric power demand is expected due to the modernization of area and/or the country. The electric power demand will have a peak in day time and low consumption in night time, while the power demand of the LNG plant is almost constant due to its nature. Combining the LNG plant with power plant will contribute an improvement the thermal efficiency of the power plant by keeping higher average load of the power plant, which will lead to a reduction of electrical power generation cost. The sweet fuel gas to the power plant can be extracted from the LNG plant, which will be favorable from view point of clean air of the area. (Author). 5 figs

  14. Annular Air Leaks in a liquid hydrogen storage tank

    Science.gov (United States)

    Krenn, AG; Youngquist, RC; Starr, SO

    2017-12-01

    Large liquid hydrogen (LH2) storage tanks are vital infrastructure for NASA, the DOD, and industrial users. Over time, air may leak into the evacuated, perlite filled annular region of these tanks. Once inside, the extremely low temperatures will cause most of the air to freeze. If a significant mass of air is allowed to accumulate, severe damage can result from nominal draining operations. Collection of liquid air on the outer shell may chill it below its ductility range, resulting in fracture. Testing and analysis to quantify the thermal conductivity of perlite that has nitrogen frozen into its interstitial spaces and to determine the void fraction of frozen nitrogen within a perlite/frozen nitrogen mixture is presented. General equations to evaluate methods for removing frozen air, while avoiding fracture, are developed. A hypothetical leak is imposed on an existing tank geometry and a full analysis of that leak is detailed. This analysis includes a thermal model of the tank and a time-to-failure calculation. Approaches to safely remove the frozen air are analyzed, leading to the conclusion that the most feasible approach is to allow the frozen air to melt and to use a water stream to prevent the outer shell from chilling.

  15. Dynamic modeling of а heating system using geothermal energy and storage tank

    Directory of Open Access Journals (Sweden)

    Milanović Predrag D.

    2012-01-01

    Full Text Available This paper analyzes a greenhouse heating system using geothermal energy and storage tank and the possibility of utilization of insufficient amount of heat from geothermal sources during the periods with low outside air temperatures. Crucial for these analyses is modelling of the necessary yearly energy requirements for greenhouse heating. The results of these analyses enable calculation of an appropriate storage tank capacity so that the energy efficiency of greenhouse heating system with geothermal energy could be significantly improved. [Acknowledgement. This work was supported by Ministry of Science and Technology Development of the Republic of Serbia through the National Energy Efficiency Program (Grant 18234 A. The authors are thankful to the stuff and management of the Company “Farmakom MB PIK 7. juli - Debrc” for their assistance during the realization of this project.

  16. CFD simulations on the dynamics of liquid sloshing and its control in a storage tank for spent fuel applications

    International Nuclear Information System (INIS)

    Sanapala, V.S.; Velusamy, K.; Patnaik, B.S.V.

    2016-01-01

    Highlights: • Dynamics of sloshing in partially filled spent fuel storage tanks is numerically simulated. • Two type of baffle plates were examined towards the control of slosh suppression. • An optimum baffles configuration was obtained, after carrying out systematic investigations. • This vertical baffle design was effective, when tested for a seismic excitation (El centro). - Abstract: Spent nuclear liquid waste is often kept in partially filled storage tanks. When such storage tanks are subjected to wind and/or earthquake induced excitations, this could lead to detrimental conditions. Therefore, storage tank designers should ensure safe design margins and develop methodologies to overcome a wide range of possible scenarios. In the present study, systematic numerical simulations are carried out to investigate the sloshing dynamics of liquid in a storage tank, subjected to seismic excitation. As a precursor, the influence of resonant harmonic excitation on the free surface displacement, pressure distribution, slosh forces etc. is studied. To suppress the free surface fluctuations and the associated slosh force, two types of baffles viz., ring and vertical baffle are examined. Based on the response to an imposed harmonic excitation, the vertical baffle plate in the middle of the tank, was found to be effective and its dimensions are systematically optimized. This baffle geometry was tested for a well known seismic excitation (El Centro) and it was observed to effectively suppress free surface fluctuations and the slosh forces.

  17. Performance of a solid oxide fuel cell CHP system coupled with a hot water storage tank for single household

    DEFF Research Database (Denmark)

    Liso, Vincenzo; Zhao, Yingru; Yang, Wenyuan

    2014-01-01

    In this paper a solid oxide fuel cell (SOFC) system for cogeneration of heat and power integrated with a stratified heat storage tank is studied. Thermal stratification in the tank increases the heat recovery performance as it allows existence of a temperature gradient with the benefit of deliver......In this paper a solid oxide fuel cell (SOFC) system for cogeneration of heat and power integrated with a stratified heat storage tank is studied. Thermal stratification in the tank increases the heat recovery performance as it allows existence of a temperature gradient with the benefit...... of delivering hot water for the household and returning the coldest fluid back to SOFC heat recovery heat-exchanger. A model of the SOFC system is developed to determine the energy required to meet the hourly average electric load of the residence. The model evaluates the amount of heat generated and the amount...... of heat used for thermal loads of the residence. Two fuels are considered, namely syngas and natural gas. The tank model considers the temperature gradients over the tank height. The results of the numerical simulation is used to size the SOFC system and storage heat tank to provide energy for a small...

  18. The use of solar energy for heating an asphalt storage tank.

    Science.gov (United States)

    1984-01-01

    10,000 gal. asphalt storage tank was equipped with a solar heating system and instrumented to determine its effectiveness over a 12.5-month period. An evaluation of the data indicated that the solar system conserved 25,126 kWh of electrical power dur...

  19. Control system design for robotic underground storage tank inspection systems

    International Nuclear Information System (INIS)

    Kiebel, G.R.

    1994-09-01

    Control and data acquisition systems for robotic inspection and surveillance systems used in nuclear waste applications must be capable, versatile, and adaptable to changing conditions. The nuclear waste remediation application is dynamic -- requirements change as public policy is constantly re-examined and refocused, and as technology in this area advances. Control and data acquisition systems must adapt to these changing conditions and be able to accommodate future missions, both predictable and unexpected. This paper describes the control and data acquisition system for the Light Duty Utility Arm (LDUA) System that is being developed for remote surveillance and inspection of underground storage tanks at the Hanford Site and other US Department of Energy (DOE) sites. It is a high-performance system which has been designed for future growth. The priority mission at the Hanford site is to retrieve the waste generated by 50 years of production from its present storage and process it for final disposal. The LDUA will help to gather information about the waste and the tanks it is stored in to better plan and execute the cleanup mission

  20. Preliminary proposed seismic design and evaluation criteria for new and existing underground hazardous materials storage tanks

    International Nuclear Information System (INIS)

    Kennedy, R.P.

    1991-01-01

    The document provides a recommended set of deterministic seismic design and evaluation criteria for either new or existing underground hazardous materials storage tanks placed in either the high hazard or moderate hazard usage catagories of UCRL-15910. The criteria given herein are consistent with and follow the same philosophy as those given in UCRL-15910 for the US Department of Energy facilities. This document is intended to supplement and amplify upon Reference 1 for underground hazardous materials storage tanks

  1. Earthquake and welded structures 5: Earthquake damages and anti-earthquake measures of oil storage tanks; 5 kikenbutsu chozo tank no jishin higai to taishin taisaku

    Energy Technology Data Exchange (ETDEWEB)

    Kawano, K. [Chiyoda Chemical Engineering and Construction Co. Ltd., Tokyo (Japan)

    1997-09-05

    The result of field investigation carried out on the state of damages of 236 hazardous material storage tanks out of 687 caused by the Hyogoken Nambu Earthquake in 1995 is introduced together with the cases of damage and the description of the countermeasures. The events of inclination and settlement of tank bodies were confirmed in 44% among those investigated in particular with tanks having a capacity of less than 1000kl and as for the basement and ground settlement, the fact that sand spouted as a result of their fluidization was witnessed as much as 81% among those investigated and the area surrounding tanks was roughly agreed with the area where ground crack appeared. A great number of other damages such as cracking of preventive seals against rain water, breakdown of oil defense banks and so forth were also confirmed. In the latter half of the report, aseismatic standards of old and new regulations as well as on the new criterion concerning the outdoor storage tank body, its basement and ground are tabulated and 4 items of anti-earthquake measures such as the final structural check up with regard to an earthquake exceeding the designed permissible stress, consolidation of tank body structure on the basis of the revised seismic coefficient method, assurance of the steadfast basement, prevention of the elevated platform from falling down and strengthening of water-proof seals and oil defense banks are enumerated in accordance with the report of investigation and examination on the resistibility of hazardous material storage equipment against the earthquake. 3 refs., 5 figs., 3 tabs.

  2. LNG market: future clouded by uncertainty

    Energy Technology Data Exchange (ETDEWEB)

    Segal, J

    1979-12-01

    The emergence of a US national energy policy playing down the role of LNG, along with a growing trend toward unfavorable production and pricing policies by LNG-exporting nations, will limit international LNG trade to about 9-10.5 billion CF/day by 1985, instead of the 13.4-15 billion CF predicted previously. In the US, LNG now stands fifth in priority as a baseload supply source, following conventional Lower 48 supplies, Alaskan pipeline gas, imports from Canada and Mexico, and domestic synthetic gas. Despite this federal policy and the adjoined decision to apply incremental pricing to future LNG imports, two new projects will soon come on-stream in the US: one to receive 450 million CF/day of Algerian gas at Lake Charles, La., and another to receive 539 million CF/day from Indonesia and 431 million CF/day from Alaska at a terminal in California.

  3. The Japanese approach to financing LNG projects

    International Nuclear Information System (INIS)

    Aoki, Wataru

    1995-01-01

    The Japanese approach approach to financing LNG project has been what could be called a combined purchase and finance system which has been arranged mainly at the initiative of japan's Sogo Shosh (general trading companies) with the support of japanese governmental financial agencies and a purchase commitment from japanese utilities. In the QATARGAS project, despite it being the first greenfield LNG project in decade since North West Shelf Australia LNG project, financing for the LNG plant phase has been successfully arranged through Japanese financing. The structuring of the financial facilities for the QATARGAS project seems to have lessons for future development of the next generation of greenfield LNG projects. Discharge of the parties' liability, proper sharing of the risk burden and reconfirmation of the spirit of mutual understanding and trust among the parties concerned are key factors for the success of any new LNG project in the future. (Author)

  4. 49 CFR 193.2509 - Emergency procedures.

    Science.gov (United States)

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES... emergency, including catastrophic failure of an LNG storage tank. (4) Cooperating with appropriate local...

  5. Method and system for offshore production of liquefied natural gas; Fremgangsmaate og system for fremstilling av flytendegjort naturgass til havs

    Energy Technology Data Exchange (ETDEWEB)

    Breivik, K.G.; Fredheim, A.O.; Paurola, P.

    1997-01-13

    The invention concerns an method and system for offshore production of liquefied natural gas (LNG), wherein natural gas is supplied from an underground source to a subsea production plant. The gas is transferred under a high pressure directly from the production plant to an LNG tanker through a pipeline underwater causing the temperature of the high pressure gas to be lowered to a desired low temperature. This gas is supplied to a conversion plant provided on the LNG tanker and arranged for converting at least a part of the gas to liquid form, and the liquefied gas is transferred to storage tanks on board the same. When the storage tanks are filled up, the pipeline is disconnected from the LNG tanker and connected to another similar tanker. The pipeline is permanently connected to a submerged buoy which is arranged for introduction and releasable securement in a submerged downwardly open receiving space in the tanker, and which is provided with a swivel unit for transfer of gas under a high pressure. 3 figs.

  6. Method and system for offshore production of liquefied natural gas; Fremgangsmaate og system for fremstilling av flytendegjort naturgass til havs

    Energy Technology Data Exchange (ETDEWEB)

    Breivik, K.G.; Fredheim, A.O.; Paurola, P.

    1996-10-14

    The invention relates to an method and a system for offshore production of liquefied natural gas, wherein natural gas is supplied from an underground source to a field installation for gas treatment. The gas is transferred in compressed form from the field installation to an LNG tanker, the transfer taking place via a pipeline surrounded by sea water, and the compressed gas being supplied to a conversion plant which is provided on the LNG tanker and is arranged to convert at least a part of the gas to liquefied form, and the liquefied gas being transferred to storage tanks on board the tanker. When the storage tanks on the LNG tanker are filled up, the pipeline is disconnected from the LNG tanker and connected to another, similar tanker, the pipeline being permanently connected to a submerged buoy which is arranged for introduction and releasable securement in a submerged downwardly open receiving space in the tanker, and which is provided with a swivel unit for transfer of gas under a high pressure. 3 figs.

  7. Case study to remove radioactive hazardous sludge from long horizontal storage tanks

    International Nuclear Information System (INIS)

    Hylton, T.D.; Youngblood, E.L.; Cummins, R.L.

    1995-01-01

    The removal of radioactive hazardous sludge from waste tanks is a significant problem at several US Department of Energy (DOE) sites. The use of submerged jets produced by mixing pumps lowered into the supernatant/sludge interface to produce a homogeneous slurry is being studied at several DOE facilities. The homogeneous slurry can be pumped from the tanks to a treatment facility or alternative storage location. Most of the previous and current studies with this method are for flat-bottom tanks with vertical walls. Because of the difference in geometry, the results of these studies are not directly applicable to long horizontal tanks such as those used at the Oak Ridge National Laboratory. Mobilization and mixing studies were conducted with a surrogate sludge (e.g., kaolin clay) using submerged jets in two sizes of horizontal tanks. The nominal capacities of these tanks were 0.87 m 3 (230 gal) and 95 m 3 (25,000 gal). Mobilization efficiencies and mixing times were determined for single and bidirectional jets in both tanks with the discharge nozzles positioned at two locations in the tanks. Approximately 80% of the surrogate sludge was mobilized in the 95-m 3 tank using a fixed bidirectional jet (inside diameter = 0.035 m) and a jet velocity of 6.4 m/s (21 ft/s)

  8. Method of disposing of earth contaminated by leaking underground storage tanks

    International Nuclear Information System (INIS)

    Ruehl, P.A.

    1993-01-01

    A process is described for disposing of earth contaminated with petroleum products from a leaking underground storage tank wherein the earth contains a significant amount of material comprised primarily of a mixture of one part Al 2 O 3 and two to three parts SiO 2 , the process comprising: digging up a leaking underground storage tank and the surrounding contaminated earth; separating the excavated earth into a Al 2 O 3 +SiO 2 material and a non-Al 2 O 3 + SiO 2 material; mixing the Al 2 O 3 + SiO 2 material and other cement precursor raw materials together to form a mixture, and grinding the mixture to form a feed mix; introducing the feed mix into a rotary cement kiln causing any remaining petroleum product contained therein to be volatilized and burned within the kiln as cement clinker is being produced; and grinding the cement clinker together to form cement which is free of petroleum product

  9. Investigation and optimisation of heat storage tanks for low-flow SDHW systems[Solar Domestic Hot Water

    Energy Technology Data Exchange (ETDEWEB)

    Knudsen, Soeren

    2004-07-01

    This thesis, 'Investigation and optimisation of heat storage tanks for low-flow SDHW systems', describes a study of the heat transfer and flow structure in vertical mantle heat exchangers for low-flow Solar Domestic Hot Water (SDHW) systems. The heat storage is a key component in SDHW systems and the vertical mantle heat exchanger is one of the most promising heat storage designs for low-flow SDHW systems. The study was carried out using a combination of experimental and numerical methods. Thermal experiments of mantle heat exchangers with different mantle inlet designs showed that the mantle inlet port with advantage can be located a distance from the top of the mantle. Consequently, the mantle heat exchangers marketed today can be improved by changing the mantle inlet position. The heat transfer and flow structure in mantle heat exchangers are rather complex and the thermal experiments were followed by investigations by means of advanced experimental and numerical techniques such as Particle Image Velocimetry (PIV) and Computational Fluid Dynamics (CFD). Using a transparent glass mantle tank, experimental flow visualisation was carried out with a PIV system. The flow structures inside the mantle and inside the tank were visualised and then compared with the flow structures predicted by CFD-models. The investigations showed that the CFD-models were able to model the flow in the mantle and in the tank correctly. The CFD-models were also validated by means of thermal experiments with a steel mantle tank. With the verified CFD-models, a parameter analysis was carried out for differently designed mantle heat exchangers for different typical conditions to reveal how the mantle tank parameters influence the flow structure and heat transfer in mantle heat exchangers. The heat transfer in the mantle near the mantle inlet port showed to be in the mixed convection regime, and as the distance from the inlet increased, natural convection started to dominate. The

  10. Nonliner analysis techniques for use in the assessment of high-level waste storage tank structures

    International Nuclear Information System (INIS)

    Moore, C.J.; Julyk, L.J.; Fox, G.L.; Dyrness, A.D.

    1991-09-01

    Reinforced concrete in combination with a steel liner has had a wide application to structures containing hazardous material. The buried double-shell waste storage tanks at the US Department of Energy's Hanford Site use this construction method. The generation and potential ignition of combustible gases within the primary tank is postulated to develop beyond-design-basis internal pressure and possible impact loading. The scope of this paper includes the illustration of analysis techniques for the assessment of these beyond-design-basis loadings. The analysis techniques include the coupling of the gas dynamics with the structural response, the treatment of reinforced concrete in regimes of inelastic behavior, and the treatment of geometric nonlinearities. The techniques and software tools presented provide a powerful nonlinear analysis capability for storage tanks. 10 refs., 13 figs., 1 tab

  11. Seismic performance of spherical liquid storage tanks: a case study

    Science.gov (United States)

    Fiore, Alessandra; Demartino, Cristoforo; Greco, Rita; Rago, Carlo; Sulpizio, Concetta; Vanzi, Ivo

    2018-02-01

    Spherical storage tanks are widely used for various types of liquids, including hazardous contents, thus requiring suitable and careful design for seismic actions. On this topic, a significant case study is described in this paper, dealing with the dynamic analysis of a spherical storage tank containing butane. The analyses are based on a detailed finite element (FE) model; moreover, a simplified single-degree-of-freedom idealization is also set up and used for verification of the FE results. Particular attention is paid to the influence of sloshing effects and of the soil-structure interaction for which no special provisions are contained in technical codes for this reference case. Sloshing effects are investigated according to the current literature state of the art. An efficient methodology based on an "impulsive-convective" decomposition of the container-fluid motion is adopted for the calculation of the seismic force. With regard to the second point, considering that the tank is founded on piles, soil-structure interaction is taken into account by computing the dynamic impedances. Comparison between seismic action effects, obtained with and without consideration of sloshing and soil-structure interaction, shows a rather important influence of these parameters on the final results. Sloshing effects and soil-structure interaction can produce, for the case at hand, beneficial effects. For soil-structure interaction, this depends on the increase of the fundamental period and of the effective damping of the overall system, which leads to reduced design spectral values.

  12. Non-linear seismic response of base-isolated liquid storage tanks to bi-directional excitation

    International Nuclear Information System (INIS)

    Shrimali, M.K.; Jangid, R.S.

    2002-01-01

    Seismic response of the liquid storage tanks isolated by lead-rubber bearings is investigated for bi-directional earthquake excitation (i.e. two horizontal components). The biaxial force-deformation behaviour of the bearings is considered as bi-linear modelled by coupled non-linear differential equations. The continuous liquid mass of the tank is modelled as lumped masses known as convective mass, impulsive mass and rigid mass. The corresponding stiffness associated with these lumped masses has been worked out depending upon the properties of the tank wall and liquid mass. Since the force-deformation behaviour of the bearings is non-linear, as a result, the seismic response is obtained by the Newmark's step-by-step method. The seismic responses of two types of the isolated tanks (i.e. slender and broad) are investigated under several recorded earthquake ground to study the effects of bi-directional interaction. Further, a parametric study is also carried out to study the effects of important system parameters on the effectiveness of seismic isolation for liquid storage tanks. The various important parameters considered are: (i) the period of isolation, (ii) the damping of isolation bearings and (iii) the yield strength level of the bearings. It has been observed that the seismic response of isolated tank is found to be insensitive to interaction effect of the bearing forces. Further, there exists an optimum value of isolation damping for which the base shear in the tank attains the minimum value. Therefore, increasing the bearing damping beyond a certain value may decrease the bearing and sloshing displacements but it may increase the base shear

  13. Closure Report for Underground Storage Tank 2310-U at the Pine Ridge West Repeater Station

    International Nuclear Information System (INIS)

    1994-07-01

    This document represents the Closure Report for Underground Storage Tank (UST) 2310-U at the Pine Ridge West Repeater Station, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Tank 2310-U was a 200-gal gasoline UST which serviced the emergency generator at the Repeater Station. The tank was situated in a shallow tank bay adjacent to the Repeater Station along the crest of Pine Ridge. The tank failed a tightness test in October 1989 and was removed in November 1989. The purpose of this report is to document completion of soil corrective action, present supporting analytical data, and request closure for this site

  14. Is LNG the way ahead for natural gas?

    International Nuclear Information System (INIS)

    Chabrelie, M.F.; Dhellemmes, J.; Hosanski, J.M.; Goy, A.

    2004-01-01

    The topic of the last 2004 meeting of the French gas association (AFG) was the liquefied natural gas (LNG) which takes a growing up share in the international gas trade. The number of liquefaction plants and re-gasification terminals have increased and liquefied natural gas tanker fleets grown to match the development of world trade. The three major French players in the LNG field are Total, which produces gas and LNG in several countries, Gaz de France (GdF) which buys in a significant quantity of LNG, and GTT which provides engineering services for shipping. To get a better inside view of the LNG question, four specialists were invited to the last AFG meeting. This paper summarizes their opinion about the following points: the world potential LNG offer and the growing up capacities (LNG development, markets, supply and demand, companies strategy), the shipping by tanker ships (membrane insulation technology, fleet uses and perspectives), convergence of LNG markets and the role of Middle-East (shipping, increase of Middle-East LNG share in the world market, major stakes for the international companies), and the constraints and opportunities of re-gasification (terminals optimization, competition for re-gasification, terminals setting up problems, technical solutions). A summary of the questions and answers with the public concludes the article. (J.S.)

  15. PENGAMBILAN KEPUTUSAN KRITERIA JAMAK (MCDM UNTUK PEMILIHAN LOKASI FLOATING STORAGE AND REGASIFICATION UNIT (FSRU: STUDI KASUS SUPLAI LNG DARI LADANG TANGGUH KE BALI

    Directory of Open Access Journals (Sweden)

    Ketut Buda Artana

    2008-01-01

    Full Text Available This paper presents a case study in selecting the best location for a Floating Storage and Regasification Unit (FSRU in Bali. FSRU is an alternative to replace a conventional shore LNG terminal. The selection involves several criteria/attributes that can be grouped into two general criteria, namely qualitative and quantitative criteria. Multiple Criteria Decision Making (MCDM approach is utilized to solve the selection problem, considering the capability of this method in solving multi-criteria problem with mutual conflict. Qualitative criteria are evaluated using AHP method to calculate weight of each criterion. Moreover, decision matrix algorithm is then utilized to convert preference of stakeholders into, consecutively, probability assignment, total probability assignment and preference degree eventually. Quantitative criteria are also converted into preference degree and entropy method is used to rank the alternatives. Selected location would be the alternative having the highest entropy. Four alternatives are under consideration. Those alternatives are Benoa, Celukan Bawang, Pemaron and Gilimanuk. This research found that Celukan Bawang is the best location for the FSRU. Abstract in Bahasa Indonesia: Paper ini menyajikan pemilihan lokasi Floating Storage and Regasification Unit (FSRU untuk proses distribusi LNG dari Ladang Tangguh ke Bali. FSRU merupakan alternatif pengganti LNG receiving terminal di darat. Pemilihan lokasi ini melibatkan kriteria kualitatif dan kuantitatif dan metode Multiple Criteria Decision Making (MCDM digunakan untuk melakukan pemilihan mengingat metode ini dapat memberi solusi tepat saat mutual conflict terjadi pada beberapa kriteria pemilihan. Penilaian terhadap beberapa alternatif didasarkan atas nilai masing-masing kriteria yang diperoleh dari kuisioner terhadap beberapa stakeholders. Untuk kriteria kualitatif dicari relative weight dengan menggunakan metode Analitik Hierarki Proses (AHP. Nilai relative weight ini

  16. Control of stress corrosion cracking in storage tanks containing radioactive waste

    International Nuclear Information System (INIS)

    Ondrejcin, R.S.; Rideout, S.P.; Donovan, J.A.

    1978-01-01

    Stress corrosion of carbon steel storage tanks containing alkaline nitrate radioactive waste, at the Savannah River Plant is controlled by specification of limits on waste composition and temperature. Cases of cracking have been observed in the primary steel shell of tanks designed and built before 1960 that were attributed to a combination of high residual stresses from fabrication welding and aggressiveness of fresh wastes from the reactor fuel reprocessing plants. The fresh wastes have the highest concentration of nitrate, which has been shown to be the cracking agent. Also as the waste solutions age and are reduced in volume by evaporation of water, nitrite and hydroxide ions become more concentrated and inhibit stress corrosion. Thus, by providing a heel of aged evaporated waste in tanks that receive fresh waste, concentrations of the inhibitor ions are maintained within specified ranges to protect against nitrate cracking. Tanks designed and built since 1960 have been made of steels with greater resistance to stress corrosion; these tanks have also been heat treated after fabrication to relieve residual stresses from construction operations. Temperature limits are also specified to protect against stress corrosion at elevated temperatures

  17. Demand-Based Optimal Design of Storage Tank with Inerter System

    Directory of Open Access Journals (Sweden)

    Shiming Zhang

    2017-01-01

    Full Text Available A parameter optimal design method for a tank with an inerter system is proposed in this study based on the requirements of tank vibration control to improve the effectiveness and efficiency of vibration control. Moreover, a response indicator and a cost control indicator are selected based on the control targets for liquid storage tanks for simultaneously minimizing the dynamic response and controlling costs. These indicators are reformulated through a random vibration analysis under virtual excitation. The problem is then transformed from a multiobjective optimization problem to a single-objective nonlinear problem using the ε-constraint method, which is consistent with the demand-based method. White noise excitation can be used to design the tank with the inerter system under seismic excitation to simplify the calculation. Subsequently, a MATLAB-based calculation program is compiled, and several optimization cases are examined under different excitation conditions. The effectiveness of the demand-based method is proven through a time history analysis. The results show that specific vibration control requirements can be met at the lowest cost with a simultaneous reduction in base shears and overturning base moments.

  18. Reducing capital and operating costs in gas processing, liquefaction, and storage

    Energy Technology Data Exchange (ETDEWEB)

    Krusen, III, L C [Phillips Petroleum Co., Bartlesville, OK (United States). Research Div.

    1997-06-01

    The LNG industry is unanimous that capital costs must be reduced throughout the chain, and especially at the liquefaction facility including associated gas processing and LNG storage. The Ken ai LNG plant provides an example of how both reduced capital and operating costs were attained. This paper will cover cost production strategies that can be applied to liquefaction processes in general, and will than focus on their realization in the Phillips Optimized Cascade LNG process. The paper concludes that reduced LNG plant costs are attainable. (Author).

  19. Reducing capital and operating costs in gas processing, liquefaction, and storage

    International Nuclear Information System (INIS)

    Krusen, L.C. III

    1997-01-01

    The LNG industry is unanimous that capital costs must be reduced throughout the chain, and especially at the liquefaction facility including associated gas processing and LNG storage. The Ken ai LNG plant provides an example of how both reduced capital and operating costs were attained. This paper will cover cost production strategies that can be applied to liquefaction processes in general, and will than focus on their realization in the Phillips Optimized Cascade LNG process. The paper concludes that reduced LNG plant costs are attainable. (Author)

  20. Prevention of stress corrosion cracking in nuclear waste storage tanks

    International Nuclear Information System (INIS)

    Ondrejcin, R.S.

    1983-01-01

    At the Savannah River Plant, stress corrosion of carbon steel storage tanks containing alkaline nitrate radioactive waste is prevented by stress relief and specification of limits on waste composition and temperature. Actual cases of cracking have occurred in the primary steel shell of tanks designed and built before 1960 and were attributed to a combination of high residual stresses from fabrication welding and aggressiveness of fresh wastes from the reactor fuel reprocessing plants. The fresh wastes have the highest concentration of nitrate, which has been shown to be the cracking agent. Also, as the waste solutions age and are reduced in volume by evaporation of water, nitrite and hydroxide ions become more concentrated and inhibit stress corrosion. Thus, by providing a heel of aged evaporated waste in tanks that receive fresh wastes, concentrations of the inhibitor ions are maintained within specific ranges to protect against nitrate cracking. The concentration and temperature range limits to prevent cracking were determined by a series of statistically designed experiments

  1. LNG Market: Developments in 2014 and 2015 Outlook. Enerdata Gas/LNG and Power Consulting - January 2015

    International Nuclear Information System (INIS)

    2015-01-01

    Enerdata power and gas expert held a webinar on the important developments happened in the LNG market in 2014 and provided insight on the LNG market outlook for 2015. 2015 is the year of uncertainty for the LNG industry. We will continue to experience low LNG prices driven by temporary liquefaction over capacity. The 2015 low prices environment will continue to support domestic gas price reforms in countries such as India, China, Malaysia and Indonesia. National economies of high LNG consumers such as Japan, Korea and Taiwan will benefit from low energy cost. Import terminal operators will see their utilization rates drop at concerning levels where the balance between operating cost and revenue starts to move on the red zone. Project developers will continue to delay their FID until they can see the light out of the tunnel. Those negotiating long term contracts have the big dilemma of shall it be oil-linked or not oil-linked. Never as before the importance to have a good insight of the future will differentiate losers from winners

  2. Fluid dynamic studies for a simulated Melton Valley Storage Tank slurry

    International Nuclear Information System (INIS)

    Hylton, T.D.; Youngblood, E.L.; Cummins, R.L.

    1994-07-01

    The Melton Valley Storage Tanks (MVSTs), are used for the collection and storage of remote-handled radioactive liquid wastes. These wastes, which were typically acidic when generated, were neutralized with the addition of sodium hydroxide to protect the storage tanks from corrosion, but this caused the transuranic and heavy metals to precipitate. These wastes will eventually need to be removed from the tanks for ultimate disposal. The objective of the research activities discussed in this report is to support the design of a pipeline transport system between the MVSTs and a treatment facility. Since the wastes in the MVSTs are highly radioactive, a surrogate slurry was developed for this study. Rheological properties of the simulated slurry were determined in a test loop in which the slurry was circulated through three pipeline viscometers of different diameters. Pressure drop data at varying flow rates were used to obtain shear stress and shear rate data. The data were analyzed, and the slurry rheological properties were analyzed by the Power Law model and the Bingham plastic model. The plastic viscosity and yield stress data obtained from the rheological tests were used as inputs for a piping design software package, and the pressure drops predicted by the software compared well with the pressure drop data obtained from the test loop. The minimum transport velocity was determine for the slurry by adding known nominal sizes of glass spheres to the slurry. However, it was shown that the surrogate slurry exhibited hindered settling, which may substantially decrease the minimum transport velocity. Therefore, it may be desired to perform additional tests with a surrogate with a lower concentration of suspended solids to determine the minimum transport velocity

  3. Tools for Inspecting and Sampling Waste in Underground Radioactive Storage Tanks with Small Access Riser Openings

    International Nuclear Information System (INIS)

    Nance, T.A.

    1998-01-01

    Underground storage tanks with 2 inches to 3 inches diameter access ports at the Department of Energy's Savannah River Site have been used to store radioactive solvents and sludge. In order to close these tanks, the contents of the tanks need to first be quantified in terms of volume and chemical and radioactive characteristics. To provide information on the volume of waste contained within the tanks, a small remote inspection system was needed. This inspection system was designed to provide lighting and provide pan and tilt capabilities in an inexpensive package with zoom abilities and color video. This system also needed to be utilized inside of a plastic tent built over the access port to contain any contamination exiting from the port. This system had to be build to travel into the small port opening, through the riser pipe, into the tank evacuated space, and out of the riser pipe and access port with no possibility of being caught and blocking the access riser. Long thin plates were found in many access riser pipes that blocked the inspection system from penetrating into the tank interiors. Retrieval tools to clear the plates from the tanks using developed sampling devices while providing safe containment for the samples. This paper will discuss the inspection systems, tools for clearing access pipes, and solvent sampling tools developed to evaluate the tank contents of the underground solvent storage tanks

  4. Oak Ridge National Laboratory Melton Valley Storage Tanks Waste Filtration Process Evaluation

    International Nuclear Information System (INIS)

    Walker, B.W.

    1998-01-01

    Cross-flow filtration is being evaluated as a pretreatment in the proposed treatment processes for aqueous high-level radioactive wastes at Oak Ridge National Laboratory (ORNL) to separate insoluble solids from aqueous waste from the Melton Valley Storage Tanks (MVST)

  5. Indian Country Leaking Underground Storage Tanks, Region 9, 2016

    Science.gov (United States)

    This GIS dataset contains point features that represent Leaking Underground Storage Tanks in US EPA Region 9 Indian Country. This dataset contains facility name and locational information, status of LUST case, operating status of facility, inspection dates, and links to No Further Action letters for closed LUST cases. This database contains 1230 features, with 289 features having a LUST status of open, closed with no residual contamination, or closed with residual contamination.

  6. Algeria's response to future LNG needs: The revamping of its LNG plants

    International Nuclear Information System (INIS)

    Bendani, A.; Rekkab, O.

    1992-01-01

    Since the beginning of the sixties, Algeria decided to participate in the international commerce of gas through its LNG. Four plants have thus been built and started in 1964, 1972, 1978 and 1981. Following the decrease in world LNG demand in the eighties, these plants built to supply 30 billion M 3 have not been operated at their full capacities. As a result, the plant equipment has suffered from this situation of partial operation (excessive shutdowns and startups). In order for SONATRACH to participate as it wishes in the expected increase in world LNG demand, two alternatives are possible to achieve this objective: Rehabilitate existing plants to enable them to operate safety and continuously to their full capacities or, build new plants. It is the first alternative that has been selected and the previous plant constructors have been selected for their renovation

  7. 49 CFR 193.2189-193.2233 - [Reserved

    Science.gov (United States)

    2010-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Design Lng Storage Tanks §§ 193.2189-193.2233 [Reserved] ...

  8. LNG and LPG total involvement of Pullman Kellogg

    Energy Technology Data Exchange (ETDEWEB)

    1978-10-01

    A discussion of Pullman Kellogg activity covers a new LNG terminal in Belgium; construction of LNG 2 for Sonatrach in Algeria; an LPG recovery system in Kuwait; the Trunkline Gas Co. LNG project at Lake Charles, La.; and the Cove Point, Md., facility for Columbia Gas System Inc. and Consolidated Natural Gas Co., which will be capable of mooring two 750,000 bbl LNG tankers simultaneously.

  9. Asia-Pacific focus of coming LNG trade boom

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that the Asia-Pacific region remains the centerpiece of a booming world trade in liquefied natural gas. Biggest growth in LNG demand is expected from some of the region's strongest economies such as Japan, South Korea, and Taiwan, Key LNG exporters such as Brunei, Malaysia, and Indonesia are scrambling to implement projects to meet that expected demand growth. Uncertainties cloud the outlook for Far East LNG trade, Australia, for one, is more cautious in pressing expansion of its LNG export capacity as more competing LNG expansions spring up around the world, notably in the Middle East and Africa

  10. An overview of the DOE high-level waste storage tank structural integrity assessment guidelines

    International Nuclear Information System (INIS)

    Bandyopadhyay, K.; Bush, S.; Kassir, M.; Mather, B.; Shewmon, P.; Streicher, M.; Thompson, B.; van Rooyen, D.; Weeks, J.

    1995-01-01

    The basic elements of a structural integrity program for high-level waste storage tanks include identifying significant aging degradation mechanisms, developing programs to monitor and control these degradation processes, and developing management options and procedures to minimize impact on the environment should tank leakage develop. A Waste Tank Structural Integrity Panel (TSIP) was established by Brookhaven National Laboratory at the request of the DOE Office of Environmental Restoration and Waste Management to review these elements and prepare a set of guidelines that could be used by DOE and its contractors to manage the structural integrity of these tanks. These guidelines emphasize the identification of significant degradation mechanisms for both the steel and concrete components of the tanks, the recommended monitoring and inspection programs, and the indicated management options

  11. 40 CFR 63.11087 - What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline...

    Science.gov (United States)

    2010-07-01

    ... gasoline storage tanks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline... § 63.11087 What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline...

  12. Experimental Investigation of Jet-Induced Mixing of a Large Liquid Hydrogen Storage Tank

    Science.gov (United States)

    Lin, C. S.; Hasan, M. M.; Vandresar, N. T.

    1994-01-01

    Experiments have been conducted to investigate the effect of fluid mixing on the depressurization of a large liquid hydrogen storage tank. The test tank is approximately ellipsoidal, having a volume of 4.89 m(exp 3) and an average wall heat flux of 4.2 W/m(exp 2) due to external heat input. A mixer unit was installed near the bottom of the tank to generate an upward directed axial jet flow normal to the liquid-vapor interface. Mixing tests were initiated after achieving thermally stratified conditions in the tank either by the introduction of hydrogen gas into the tank or by self-pressurization due to ambient heat leak through the tank wall. The subcooled liquid jet directed towards the liquid-vapor interface by the mixer induced vapor condensation and caused a reduction in tank pressure. Tests were conducted at two jet submergence depths for jet Reynolds numbers from 80,000 to 495,000 and Richardson numbers from 0.014 to 0.52. Results show that the rate of tank pressure change is controlled by the competing effects of subcooled jet flow and the free convection boundary layer flow due to external tank wall heating. It is shown that existing correlations for mixing time and vapor condensation rate based on small scale tanks may not be applicable to large scale liquid hydrogen systems.

  13. 49 CFR 193.2067 - Wind forces.

    Science.gov (United States)

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES... confining, structure; and (3) In the case of impounding systems for LNG storage tanks, impact forces and...

  14. Coordination of ministerial actions regarding the use of liquefied natural gas (LNG) as fuel. LNG, a European component of the energy transition in road freight transport

    International Nuclear Information System (INIS)

    Maler, Philippe; Erhardt, Jean-Bernard; Ourliac, Jean-Paul

    2015-09-01

    This report is the third of a series dealing with the coordination of ministerial actions in favor of the use of liquefied natural gas (LNG) as fuel in transports. LNG is an important potential substitute to diesel fuel in road transport and would allow significant abatement of nitrogen oxides emissions. Bio-LNG is ten times less polluting than fossil fuel LNG and thus important efforts are to be made in bio-LNG R and D. An important work has been carried out for adapting EU regulations and standards to LNG vehicles and LNG supply developments. This report presents, first, a summary of the report's recommendations and the aim of this coordination study, and, then, treats more thoroughly of the different coordination aspects: 1 - European framework of energy transition in the road freight transport (differences with maritime transport, CO 2 emissions abatement, trucks pollution and fuel quality standards, trucks technical specifications and equipment, fuel taxes in EU countries); 2 - European policy and national actions in favour of LNG development for road transport (LNG as alternate fuel, the Paris agreement, the French national energy plan); 3 - Environmental benefits of LNG in road transport (public health impacts, nitrogen oxides abatement, divergent views and expertise, LNG and CO 2 abatement measures, bio-LNG environmental evaluation; 4 - LNG development actors in road transport and the administrative coordination (professional organizations, public stakeholders, LNG topics information dissemination at the Ministry); 5 - LNG development in road transport at the worldwide, European and national scales; 6 - European regulations and standards allowing trucks LNG fueling and circulation (standard needs, users information, regulation works); 7 - Common rules to define and implement for personnel training; 8 - reflexion on LNG taxation; 9 - support policy for a road transport LNG supply chain (infrastructures, European financing, lessons learnt from maritime

  15. Optimization of storage tank locations in an urban stormwater drainage system using a two-stage approach.

    Science.gov (United States)

    Wang, Mingming; Sun, Yuanxiang; Sweetapple, Chris

    2017-12-15

    Storage is important for flood mitigation and non-point source pollution control. However, to seek a cost-effective design scheme for storage tanks is very complex. This paper presents a two-stage optimization framework to find an optimal scheme for storage tanks using storm water management model (SWMM). The objectives are to minimize flooding, total suspended solids (TSS) load and storage cost. The framework includes two modules: (i) the analytical module, which evaluates and ranks the flooding nodes with the analytic hierarchy process (AHP) using two indicators (flood depth and flood duration), and then obtains the preliminary scheme by calculating two efficiency indicators (flood reduction efficiency and TSS reduction efficiency); (ii) the iteration module, which obtains an optimal scheme using a generalized pattern search (GPS) method based on the preliminary scheme generated by the analytical module. The proposed approach was applied to a catchment in CZ city, China, to test its capability in choosing design alternatives. Different rainfall scenarios are considered to test its robustness. The results demonstrate that the optimal framework is feasible, and the optimization is fast based on the preliminary scheme. The optimized scheme is better than the preliminary scheme for reducing runoff and pollutant loads under a given storage cost. The multi-objective optimization framework presented in this paper may be useful in finding the best scheme of storage tanks or low impact development (LID) controls. Copyright © 2017 Elsevier Ltd. All rights reserved.

  16. Mathematical Simulation of Convective Heat Transfer in the Low-Temperature Storage of Liquefied Natural Gas

    Directory of Open Access Journals (Sweden)

    Shestakov Igor A.

    2015-01-01

    Full Text Available The article shows the results of mathematical modeling of convective heat transfer in the low-temperature storage of liquefied natural gas. Regime of natural convection in an enclosure with different intensity of the heat flux at the external borders are investigated. Was examined two-dimensional nonstationary problem within the model of Navier-Stokes in dimensionless variables “vorticity - stream function - temperature”. Distributions of hydrodynamic parameters and temperatures that characterize the basic regularities of the processes are obtained. Circulating flows are determined and carried out the analysis of vortices formation mechanism and the temperature distribution in solution at conditions of natural convection when the Grashof number (Gr = 106. A significant influence of heat transfer rate on solutions boundary on flow structure and temperature field in LNG storage tanks.

  17. Fluid manifold design for a solar energy storage tank

    Science.gov (United States)

    Humphries, W. R.; Hewitt, H. C.; Griggs, E. I.

    1975-01-01

    A design technique for a fluid manifold for use in a solar energy storage tank is given. This analytical treatment generalizes the fluid equations pertinent to manifold design, giving manifold pressures, velocities, and orifice pressure differentials in terms of appropriate fluid and manifold geometry parameters. Experimental results used to corroborate analytical predictions are presented. These data indicate that variations in discharge coefficients due to variations in orifices can cause deviations between analytical predictions and actual performance values.

  18. RCRA corrective action for underground storage tanks -- Subtitle C for Subtitle I

    International Nuclear Information System (INIS)

    1995-08-01

    The purpose of this report is to provide guidance to DOE and DOE contractor personnel responsible for planning and implementation of corrective measures addressing cleanup of releases of hazardous materials or regulated substances from underground storage tanks regulated under RCRA Subtitle C or Subtitle I

  19. Structural Integrity Program for the 300,000-Gallon Radioactive Liquid Waste Storage Tanks at the Idaho Nuclear Technology and Engineering Center

    International Nuclear Information System (INIS)

    Bryant, J.W.; Nenni, J.A.; Yoder, T.S.

    2003-01-01

    This report provides a record of the Structural Integrity Program for the 300,000-gal liquid waste storage tanks and associated equipment at the Idaho Nuclear Technology and Engineering Center, as required by U.S. Department of Energy M 435.1-1, ''Radioactive Waste Management Manual.'' This equipment is known collectively as the Tank Farm Facility. The conclusion of this report is that the Tank Farm Facility tanks, vaults, and transfer systems that remain in service for storage are structurally adequate, and are expected to remain structurally adequate over the remainder of their planned service life through 2012. Recommendations are provided for continued monitoring of the Tank Farm Facility

  20. Behavior of ruthenium in the case of shutdown of the cooling system of HLLW storage tanks

    International Nuclear Information System (INIS)

    Philippe, M.; Mercier, J.P.; Gue, J.P.

    1990-01-01

    The consequences of the failure of the cooling system of fission product storage tanks over a variable period were investigated as part of the safety analysis of the La Hague spent fuel reprocessing plant. Due to the considerable heat release, induced by the fission products, a prolonged shutdown of the tank cooling system could cause the progressive evaporation of the solutions to dryness, and culminate in the formation of volatile species of ruthenium and their release in the tank venting circuit. To determine the fraction of ruthenium likely to be transferred from the storage tanks in volatile or aerosol form during the failure, evaporation tests were conducted by evaporating samples of actual nitric acid solutions of fission products, obtained on the laboratory scale after the reprocessing of several kilograms of MOX fuels irradiated to 30,000 MWday.t -1 . A distillation apparatus was designed to operate with small volume solution samples, reproducing the heating conditions existing in the reprocessing plant within a storage tank for fission products. The main conclusions drawn from these experiments are as follows: - ruthenium is only volatilized in the final phase of evaporation, just before desiccation, - for a final temperature limited to 160 0 C, the total fraction of volatilized ruthenium reaches 12%, in the presence of H 2 0, HN0 3 , N0 x and 0 2 , the volatilized ruthenium recombines mainly in the form of ruthenium nitrosyl nitrates, or decomposes into ruthenium oxide on the walls of the apparatus. Assuming a heating power density of 10 W/liter of concentrate, and a perfectly adiabatic storage system, the minimum time required to reach dryness can be estimated at 90 h, allowing substantial time to take action to restore a cooling source

  1. Behavior of ruthenium in the case of shutdown of the cooling system of HLLW storage tanks

    International Nuclear Information System (INIS)

    Philippe, M.; Mercier, J.P.; Gue, J.P.

    1991-01-01

    The consequences of the failure of the cooling system of fission product storage tanks over a variable period were investigated as part of the safety analysis of the La Hague spent fuel reprocessing plant. Due to the considerable heat release, induced by the fission products, a prolonged shutdown of the tank cooling system could cause the progressive evaporation of the solutions to dryness, and culminate in the formation of volatile species of ruthenium and their release in the tank venting circuit. To determine the fraction of ruthenium likely to be transferred from the storage tanks in volatile or aerosol form during the failure, evaporation tests were conducted by evaporating samples of actual nitric acid solutions of fission products, obtained on the laboratory scale after the reprocessing of several kilograms of MOX fuels irradiated to 30,000 MW day·t -1 . A distillation apparatus was designed to operate with small-volume solution samples, reproducing the heating conditions existing in the reprocessing plant within a storage tank for fission products. The main conclusions drawn from these experiments are as follows: ruthenium is only volatilized in the final phase of evaporation, just before desiccation; for a final temperature limited to 160 degree C, the total fraction of volatilized ruthenium reaches 12%; in the presence of H 2 O, HNO 3 , NO x and O 2 , the volatilized ruthenium recombines mainly in the form of ruthenium nitrosyl nitrates, or decomposes into ruthenium oxide (probably RuO 2 ) on the walls of the apparatus. Assuming a heating power density of 10 W/liter of concentrate, and a perfectly adiabatic storage system, the minimum time required to reach dryness can be estimated at 90 h, allowing substantial time to take action to restore a cooling source

  2. Tank Insulation

    Science.gov (United States)

    1979-01-01

    For NASA's Apollo program, McDonnell Douglas Astronautics Company, Huntington Beach, California, developed and built the S-IVB, uppermost stage of the three-stage Saturn V moonbooster. An important part of the development task was fabrication of a tank to contain liquid hydrogen fuel for the stage's rocket engine. The liquid hydrogen had to be contained at the supercold temperature of 423 degrees below zero Fahrenheit. The tank had to be perfectly insulated to keep engine or solar heat from reaching the fuel; if the hydrogen were permitted to warm up, it would have boiled off, or converted to gaseous form, reducing the amount of fuel available to the engine. McDonnell Douglas' answer was a supereffective insulation called 3D, which consisted of a one-inch thickness of polyurethane foam reinforced in three dimensions with fiberglass threads. Over a 13-year development and construction period, the company built 30 tanks and never experienced a failure. Now, after years of additional development, an advanced version of 3D is finding application as part of a containment system for transporting Liquefied Natural Gas (LNG) by ship.

  3. Research of design challenges and new technologies for floating LNG

    Directory of Open Access Journals (Sweden)

    Dong-Hyun Lee

    2014-06-01

    Full Text Available With the rate of worldwide LNG demand expected to grow faster than that of gas demand, most major oil companies are currently investing their resources to develop floating LNG-FLNG (i.e. LNG FSRU and LNG FPSO. The global Floating LNG (FLNG market trend will be reviewed based on demand and supply chain relationships. Typical technical issues associated with FLNG design are categorized in terms of global performance evaluation. Although many proven technologies developed through LNG carrier and oil FPSO projects are available for FLNG design, we are still faced with several technical challenges to clear for successful FLNG projects. In this study, some of the challenges encountered during development of the floating LNG facility (i.e. LNG FPSO and FSRU will be reviewed together with their investigated solution. At the same time, research of new LNG-related technologies such as combined containment system will be presented.

  4. Tank 244A tank characterization plan

    International Nuclear Information System (INIS)

    Schreiber, R.D.

    1994-01-01

    The Double-Shell Tank (DST) System currently receives waste from the Single-Shell Tank (SST) System in support of SST stabilization efforts or from other on-site facilities which generate or store waste. Waste is also transferred between individual DSTs. The mixing or commingling of potentially incompatible waste types at the Hanford Site must be addressed prior to any waste transfers into the DSTs. The primary goal of the Waste Compatibility Program is to prevent the formation of an Unreviewed Safety Question (USQ) as a result of improper waste management. Tank 244A is a Double Contained Receiver Tank (DCRT) which serves as any overflow tank for the East Area Farms. Waste material is able to flow freely between the underground storage tanks and tank 244A. Therefore, it is necessary to test the waste in tank 244A for compatibility purposes. Two issues related to the overall problem of waste compatibility must be evaluated: Assurance of continued operability during waste transfer and waste concentration and Assurance that safety problems are not created as a result of commingling wastes under interim storage. The results of the grab sampling activity prescribed by this Tank Characterization Plan shall help determine the potential for four kinds of safety problems: criticality, flammable gas accumulation, energetics, and corrosion and leakage

  5. Cathodic protection for the bottoms of above ground storage tanks

    Energy Technology Data Exchange (ETDEWEB)

    Mohr, John P. [Tyco Adhesives, Norwood, MA (United States)

    2004-07-01

    Impressed Current Cathodic Protection has been used for many years to protect the external bottoms of above ground storage tanks. The use of a vertical deep ground bed often treated several bare steel tank bottoms by broadcasting current over a wide area. Environmental concerns and, in some countries, government regulations, have introduced the use of dielectric secondary containment liners. The dielectric liner does not allow the protective cathodic protection current to pass and causes corrosion to continue on the newly placed tank bottom. In existing tank bottoms where inadequate protection has been provided, leaks can develop. In one method of remediation, an old bottom is covered with sand and a double bottom is welded above the leaking bottom. The new bottom is welded very close to the old bottom, thus shielding the traditional cathodic protection from protecting the new bottom. These double bottoms often employ the use of dielectric liner as well. Both the liner and the double bottom often minimize the distance from the external tank bottom. The minimized space between the liner, or double bottom, and the bottom to be protected places a challenge in providing current distribution in cathodic protection systems. This study examines the practical concerns for application of impressed current cathodic protection and the types of anode materials used in these specific applications. One unique approach for an economical treatment using a conductive polymer cathodic protection method is presented. (author)

  6. The globalization and environmental sustainability of LNG: Is LNG a fuel for the 21st century?

    Energy Technology Data Exchange (ETDEWEB)

    Sakmar, Susan

    2010-09-15

    As the world enters the 21st Century, policy makers around the world are grappling with issues related to energy security, energy poverty, global climate change, and the need to reduce greenhouse gas emissions while meeting an expected increase in demand for all energy sources. As a clean burning fuel, many policy leaders have suggested that LNG can play an important role as the world struggles to develop a more environmental sustainable energy future. Others claim that the safety and environmental impact of LNG, including life-cycle emissions, may nullify any clean burning benefit LNG might otherwise provide.

  7. Leaking Underground Storage Tank Points, Region 9 Indian Country, 2017, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — This GIS dataset contains point features that represent Leaking Underground Storage Tanks in US EPA Region 9 Indian Country. This dataset contains facility name and...

  8. Risk Based Inspection Methodology and Software Applied to Atmospheric Storage Tanks

    Science.gov (United States)

    Topalis, P.; Korneliussen, G.; Hermanrud, J.; Steo, Y.

    2012-05-01

    A new risk-based inspection (RBI) methodology and software is presented in this paper. The objective of this work is to allow management of the inspections of atmospheric storage tanks in the most efficient way, while, at the same time, accident risks are minimized. The software has been built on the new risk framework architecture, a generic platform facilitating efficient and integrated development of software applications using risk models. The framework includes a library of risk models and the user interface is automatically produced on the basis of editable schemas. This risk-framework-based RBI tool has been applied in the context of RBI for above-ground atmospheric storage tanks (AST) but it has been designed with the objective of being generic enough to allow extension to the process plants in general. This RBI methodology is an evolution of an approach and mathematical models developed for Det Norske Veritas (DNV) and the American Petroleum Institute (API). The methodology assesses damage mechanism potential, degradation rates, probability of failure (PoF), consequence of failure (CoF) in terms of environmental damage and financial loss, risk and inspection intervals and techniques. The scope includes assessment of the tank floor for soil-side external corrosion and product-side internal corrosion and the tank shell courses for atmospheric corrosion and internal thinning. It also includes preliminary assessment for brittle fracture and cracking. The data are structured according to an asset hierarchy including Plant, Production Unit, Process Unit, Tag, Part and Inspection levels and the data are inherited / defaulted seamlessly from a higher hierarchy level to a lower level. The user interface includes synchronized hierarchy tree browsing, dynamic editor and grid-view editing and active reports with drill-in capability.

  9. World economic growth pushing LNG use

    International Nuclear Information System (INIS)

    Brown, R.L.; Clary, R.

    1997-01-01

    Natural gas, especially liquefied (LNG), is in position to participate in the energy growth now being triggered by strong worldwide economic growth, increasingly open markets, and expanding international trade. Natural gas is abundant, burns cleanly, and is highly efficient in combined-cycle, gas-turbine power plants. Moreover, the comparative remoteness of much of the resource base to established and emerging markets can make LNG a compelling processing and transportation alternative. Discussed here are the resource distribution and emerging market opportunities that can make LNG attractive for monetizing natural-gas reserves

  10. Energy system investment model incorporating heat pumps with thermal storage in buildings and buffer tanks

    International Nuclear Information System (INIS)

    Hedegaard, Karsten; Balyk, Olexandr

    2013-01-01

    Individual compression heat pumps constitute a potentially valuable resource in supporting wind power integration due to their economic competitiveness and possibilities for flexible operation. When analysing the system benefits of flexible heat pump operation, effects on investments should be taken into account. In this study, we present a model that facilitates analysing individual heat pumps and complementing heat storages in integration with the energy system, while optimising both investments and operation. The model incorporates thermal building dynamics and covers various heat storage options: passive heat storage in the building structure via radiator heating, active heat storage in concrete floors via floor heating, and use of thermal storage tanks for space heating and hot water. It is shown that the model is well qualified for analysing possibilities and system benefits of operating heat pumps flexibly. This includes prioritising heat pump operation for hours with low marginal electricity production costs, and peak load shaving resulting in a reduced need for peak and reserve capacity investments. - Highlights: • Model optimising heat pumps and heat storages in integration with the energy system. • Optimisation of both energy system investments and operation. • Heat storage in building structure and thermal storage tanks included. • Model well qualified for analysing system benefits of flexible heat pump operation. • Covers peak load shaving and operation prioritised for low electricity prices

  11. Remediation and recycling of oil-contaminated soil beneath a large above-ground storage tank

    International Nuclear Information System (INIS)

    Wallace, G.

    1994-01-01

    While retrofitting a large 30-year-old, above-ground petroleum storage tank, Southern California Edison Company (SCE) discovered that soil beneath the fixed-roof, single-bottom tank was contaminated with 40,000 gallons of number-sign 6 fuel oil. The steel tank was left in place during the excavation and remediation of the contaminated soil to retain the operating permit. The resulting 2,000 tons of contaminated aggregate was recycled to make asphalt concrete for paving the tank basin and the remaining 5,600 tons of oily soil was thermally treated on site for use as engineered fill at another location. This successful operation provided an economical cleanup solution for a common leakage problem of single-lined tanks and eliminated the long-term liability of Class 1 landfill disposal. As a pro-active environmental effort, this paper shares SCE's site assessment procedure, reveals the engineering method developed to stabilize the tank, discusses the soil treatment technologies used, describes the problems encountered and lessons learned during the cleanup, discloses the costs of the operation, and offers guidelines and recommendations for similar tank remediation. This paper does not describe the work or costs for removing or replacing the tank bottom

  12. Underground storage tanks soft waste dislodging and conveyance

    International Nuclear Information System (INIS)

    Wellner, A.F.

    1993-10-01

    Currently 140 million liters (37 million gallons) of waste are stored in the single shell underground storage tanks (SSTs) at Hanford. The wastes contain both hazardous and radioactive constituents. This paper focuses on the Westinghouse Hanford Company's testing program for soft waste dislodging and conveyance technology. This program was initialized to investigate methods of dislodging and conveying soft waste. The main focus was on using air jets, water jets, and/or mechanical blades to dislodge the waste and air conveyance to convey the dislodged waste. These waste dislodging and conveyance technologies would be used in conjunction with a manipulator based retrieval system

  13. Long-reach manipulation for waste storage tank remediation

    International Nuclear Information System (INIS)

    Jansen, J.F.; Burks, B.L.; Babcock, S.M.; Kress, R.L.; Hamel, W.R.

    1991-01-01

    Remediation of large underground storage tanks containing hazardous waste provides an application for state-of-the-art technology in flexible link manipulator design and control and a need for additional research and development. Application requirements are described, and preliminary analyses associated with this problem are summarized. Inherent physical limitations of flexible manipulators are discussed. Potential kinematic configurations, drive-train elements, and control issues for both free-space motion and damping of forced vibration are addressed. Also included are future directions for research and development in mechanical components and control strategies. 21 refs., 4 figs., 4 tabs

  14. Liquid natural gas. Japan

    International Nuclear Information System (INIS)

    Van Kooij, E.

    1998-01-01

    An overview is given of the technical know-how and expertise in Japan with respect to the supply, transport, storage and use of LNG. First the overall energy supply in Japan is outlined. Next, the reasons for the use of LNG as an energy source in Japan are discussed. As an example of a typical LNG-installation in Japan the construction of the Himeji Terminal of Osaka Gas Company is described. Finally, attention is paid to the world's largest and modern below-surface LNG-tanks (capacity of 200,000 m 3 ), installed at the Negishi Terminal of Tokyo Gas Company

  15. In-service inspection of ET-RR-1 reactor vessels and spent fuel storage tank

    International Nuclear Information System (INIS)

    Khattab, M.; Shafy, M.; Konoplev, K.; Samodurve, YU.; Orlov, S.; Didenko, V.; Jackorev, O.

    1993-01-01

    Technical survey included in-service inspection are needed in order to investigate the structural integrity and to insure safe operation of the ET-R R-1 reactor after thirty years aging. An intensive work for the inspection of the inspection of the central tank, shield tank, horizontal channels, primary coolant circuit and spent fuel storage tank have been carried out. The inspection procedures were visual method using video camera and magnification optical as well as thickness measurements using ultrasonic gauge meter and replica for determining defect depth. Water chemical analysis of the primary cooling circuit and spent fuel storage were helpful in results explanation. The results showed that the reactor vessels have good surface conditions. The observed pitting did not affect the structural integrity. The majority of the defects were pits having maximum surface area of about 50 mm. Their depth does not exceed 2 mm. The pits depth rate penetration is of the order of 0.5% per year. Thickness measurements showed insignificant variation. Water status and its chemical properties are very important in controlling corrosion rate. 18 figs., 14 tabs

  16. Speciation of organic carbon in Hanford waste storage tanks: Part 1

    International Nuclear Information System (INIS)

    Carlson, C.D.

    1997-02-01

    This report is the first in a series to report on speciation of organic carbon in Hanford waste storage tanks. The comparison of the existing total organic carbon with oxalate and limited analyses of other organic species (acetate, formate, and normal paraffin hydrocarbons [NPH]) are reported. All of the data have been previously reported by the Grout and Characterization programs; the information includes all of the publicly available data through October 1996. Oxalate data were reported for 33 tanks, TOC data were reported for 82 tanks, and both oxalate and TOC data were available for 27 tanks. Of these 27 tanks, seven were found to have greater than 80% of the TOC identified as oxalate: 241-BY-104, 241-BY-105, 241-BY-106, 241-BY-110, 241-S-109, and 241-SX-108. Eighty percent accountability has been tentatively established as a minimum goal of the Organic Safety Program for speciation of TOC. Accountability of TOC through speciation will allow more accurate estimate of the potential energy content of the wastes as currently stored. Of the remaining 19 tanks, seven had between 40 and 80% of the TOC identified as oxalate, and eleven had less than 35% of the TOC identified. Of these, only five tanks had segment results that were greater than 1% TOC, and none was above 2%. Since the cur-rent safety criterion outlined in the Safety Analysis is 4.5% TOC, it may be determined that the further analyses of these tank wastes are not necessary. If additional analyses are deemed necessary, minimal work may be required, possibly limited to ion chromatography (IC), ion pair chromatography and capillary zone electrophoresis (CZE). Additional speciation work is planned for this fiscal year in both the Organic Tanks Safety and Characterization programs. The Characterization program reports acetate and formate data in addition to the oxalate data for all the tank cores it processes

  17. Closure report for underground storage tank 141-R3U1 and its associated underground piping

    Energy Technology Data Exchange (ETDEWEB)

    Mallon, B.J.; Blake, R.G.

    1994-03-01

    Underground storage tank UST 141-R3U1 at Lawrence Livermore National Laboratory (LLNL), was registered with the State Water Resources Control Board on June 27, 1984. This tank system consisted of a concrete tank, lined with polyvinyl chloride, and approximately 100 feet of PVC underground piping. UST 141-R3U1 had a capacity of 450 gallons. The underground piping connected three floor drains and one sink inside Building 141 to UST 141-R3U1. The wastewater collected in UST 141-R3U1 contained organic solvents, metals, and inorganic acids. On November 30, 1987, the 141-R3U1 tank system failed a precision tank test. The 141-R3U1 tank system was subsequently emptied and removed from service pending further precision tests to determine the location of the leak within the tank system. A precision tank test on February 5, 1988, was performed to confirm the November 30, 1987 test. Four additional precision tests were performed on this tank system between February 25, 1988, and March 6, 1988. The leak was located where the inlet piping from Building 141 penetrates the concrete side of UST 141-R3U1. The volume of wastewater that entered the backfill and soil around and/or beneath UST 141-R3U1 is unknown. On December 13, 1989, the LLNL Environmental Restoration Division submitted a plan to close UST 141-R3U1 and its associated piping to the Alameda County Department of Environmental Health. UST 141-R3U1 was closed as an UST, and shall be used instead as additional secondary containment for two aboveground storage tanks.

  18. Closure report for underground storage tank 141-R3U1 and its associated underground piping

    International Nuclear Information System (INIS)

    Mallon, B.J.; Blake, R.G.

    1994-03-01

    Underground storage tank UST 141-R3U1 at Lawrence Livermore National Laboratory (LLNL), was registered with the State Water Resources Control Board on June 27, 1984. This tank system consisted of a concrete tank, lined with polyvinyl chloride, and approximately 100 feet of PVC underground piping. UST 141-R3U1 had a capacity of 450 gallons. The underground piping connected three floor drains and one sink inside Building 141 to UST 141-R3U1. The wastewater collected in UST 141-R3U1 contained organic solvents, metals, and inorganic acids. On November 30, 1987, the 141-R3U1 tank system failed a precision tank test. The 141-R3U1 tank system was subsequently emptied and removed from service pending further precision tests to determine the location of the leak within the tank system. A precision tank test on February 5, 1988, was performed to confirm the November 30, 1987 test. Four additional precision tests were performed on this tank system between February 25, 1988, and March 6, 1988. The leak was located where the inlet piping from Building 141 penetrates the concrete side of UST 141-R3U1. The volume of wastewater that entered the backfill and soil around and/or beneath UST 141-R3U1 is unknown. On December 13, 1989, the LLNL Environmental Restoration Division submitted a plan to close UST 141-R3U1 and its associated piping to the Alameda County Department of Environmental Health. UST 141-R3U1 was closed as an UST, and shall be used instead as additional secondary containment for two aboveground storage tanks

  19. Performance improvement by discharge from different levels in solar storage tanks

    DEFF Research Database (Denmark)

    Furbo, Simon; Andersen, Elsa; Thür, Alexander

    2005-01-01

    The thermal advantages by utilizing discharge from different levels in solar storage tanks are investigated, both for a small SDHW system and for a solar combisystem. The investigations showed that it is possible to increase the thermal performance of both types of systems by using two draw......-off levels from the solar tanks instead of one draw-off level at a fixed position. The best position of the second draw-off level is in the middle or just above the middle of the tank. For the investigated small SDHW system with a realistic draw off hot water temperature of 40°C and 45°C and an auxiliary...... volume temperature of 50.5°C the increase of the thermal performance by the second draw-off level is about 6%. For the investigated solar combisystem the extra thermal performance by using one extra draw-off level, either for the domestic hot water heat exchanger or for the heating system, is about 3...

  20. The economic value of LNG in the Korean manufacturing industry

    International Nuclear Information System (INIS)

    Park, Sun-Young; Yoo, Seung-Hoon

    2013-01-01

    Although LNG is an important input to industrial production for manufacturing firms, its economic value has been rarely investigated in the literature. This paper attempts to estimate the economic value of LNG in Korea's manufacturing sector by employing the concept of the value of marginal product (VMP). For this, we used data on 328 firms using LNG as an input. Two types of production functions (the Cobb–Douglas and trans-log functions) are applied. The result of the specification test indicates that the trans-log function is more appropriate for estimating the data. The output elasticity and VMP of industrial LNG are estimated to be 0.1346 and KRW 6844 (USD 6.22) per m 3 , respectively. The results have important implications for various areas of industrial LNG management. For example, any cost–benefit analysis of new projects providing industrial LNG requires information on the economic value of industrial LNG. In addition, such information is useful for the Korean government's future policies on LNG pricing. - Highlights: • We estimate the economic value of LNG in the Korean manufacturing industry. • We employ the concept of the value of marginal product (VMP). • The VMP of industrial LNG is estimated to be KRW 6844 (USD 6.22) per m 3 . • It significantly outweighs the price of industrial LNG (KRW 629.4 per m 3 )

  1. Long-term energy storage tanks for dwellings and solar house architecture. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-12-01

    The design and installation of hot water storage tanks as accumulators of solar energy is presented. Solar house architecture which maximizes roof, solar collector energy absorption potential is then considered. Proposals for residential areas which include solar houses are made.

  2. VOLUMETRIC LEAK DETECTION IN LARGE UNDERGROUND STORAGE TANKS - VOLUME II: APPENDICES A-E

    Science.gov (United States)

    The program of experiments conducted at Griffiss Air Force Base was devised to expand the understanding of large underground storage tank behavior as it impacts the performance of volumetric leak detection testing. The report addresses three important questions about testing the ...

  3. Russian LNG: The Long Road to Export

    International Nuclear Information System (INIS)

    Mitrova, Tatiana

    2013-12-01

    On December 1, 2013 a law on liquefied natural gas (LNG) export liberalization came into legal force in Russia. The law grants two categories of companies other than Russia's state gas giant Gazprom and its subsidiary companies the right to export LNG: (1) users of mineral resources that have a license to construct an LNG plant or to send their gas production for liquefaction, and (2) companies that are more than 50% owned by the Russian government, for gas produced from Russian offshore fields or under production-sharing agreements. This is-without exaggeration-a historic decision for the Russian gas industry, the path to which was certainly not easy. Recent years have seen a radical change in the global economic climate, which has changed the dynamics of the European gas market (gas demand decline and Russian gas import reduction, changing pricing mechanism for a much higher share of spot indexing, European Commission anti-trust investigations against Gazprom, etc) and is increasingly pushing Russia to diversify its gas exports. However, diversifying exports through the development of LNG has proven to be not so simple. Over the past 20 years, with the exception of the Sakhalin-2 project, structured under a project-sharing agreement (PSA) rather than in the framework of national legislation, all other projects failed to come close to completion. The Kharasavey and Baltic LNG projects were abandoned in the early stages of project evaluation, while the Shtokman project progressed to the point of the operating company being created, but in the end was postponed indefinitely. The first stage of LNG development in Russia ended in failure. However, the Russian government considers the development of LNG exports to be a priority, which can be evidenced in all official policy papers. It is believed that LNG will help in achieving a set of objectives, namely: increasing the absolute volume of exports, allowing the country to enter into previously inaccessible markets

  4. Detection of simulated pitting corrosion and noises in crude oil storage tank by acoustic emission

    International Nuclear Information System (INIS)

    Shukri Mohd; Latif, N.A.; Azhar Mohd Sinin; Mohamad Daud; Abd Nasir Ibrahim

    2008-01-01

    The damage mechanisms associated with crude oil storage tanks can be complex and varied and include pitting corrosion due to presence of species such as sulphate reducing bacteria. Acoustic Emission (AE) could be used to characterise the pitting corrosion signal in crude oil storage tanks but it is extremely difficult to simulate the pitting corrosion in the laboratory using crude oil as electrolyte because crude oil is considered as non corrosive medium. In this study, induced current have been introduced onto a surface ASTM 516 steel as an electrical source to simulate the electrical noise produced during pitting corrosion process and AE sensor have been used to detect this current. It is found that AE system could detect AE signal release during current induction this current and is expected that if the exact simulation of the current magnitude produced during pitting corrosion process is made available, AE characterisation of pitting corrosion in such tank could be made possible. (Author)

  5. Numerical simulation of sloshing in rectangular tanks with OpenFOAM CFD Package

    International Nuclear Information System (INIS)

    Andreski, Filip; Markov, Zoran; Diebold, Louis; Gazzola, Thomas

    2009-01-01

    The aim of this paper is to simulate the sloshing phenomenon using OpenFOAM CFD software package. The present paper treats a 2D numerical simulation of a partially filled tank that is located on a LNG carrier. Experiments were done on a rectangular tank excited with different excitation periods and amplitudes and the pressure was measured at certain locations on the tank walls. The goal of this research is to compare the experimental data for the pressure with the pressure results obtained with the CFD software. It is shown that the obtained results match well with the experimental data.

  6. 49 CFR 193.2183-193.2185 - [Reserved

    Science.gov (United States)

    2010-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Design Impoundment Design and Capacity §§ 193.2183-193.2185 [Reserved] LNG Storage Tanks ...

  7. Fire hazards analysis for W-413, West Area Tank Farm Storage and Staging Facility

    International Nuclear Information System (INIS)

    Huckfeldt, R.A.; Lott, D.T.

    1994-01-01

    In accordance with DOE Order 5480.7A, a Fire Hazards Analysis must be performed for all new facilities. The purpose of the analysis is to comprehensively assess the risk from fire within individual fire areas in relation to proposed fire protection so as to ascertain whether the fire protection objectives of the Order are met. The Order acknowledges a graded approach commensurate with the hazards involved. Tank Farms Operations must sore/stage material and equipment such as pipes, fittings, conduit, instrumentation and others related items until work packages are ready to work. Consumable materials, such as nut, bolts and welding rod, are also requires to be stored for routine and emergency work. Connex boxes and open storage is currently used for much of the storage because of the limited space at and 272WA. Safety issues based on poor housekeeping and material deteriorating due to weather damage has resulted from this inadequate storage space. It has been determined that a storage building in close proximity to the Tank Farm work force would be cost effective. This facility is classified as a safety class 4 building

  8. Enhancement of energy performance in a boil-off gas re-liquefaction system of LNG carriers using ejectors

    International Nuclear Information System (INIS)

    Tan, Hongbo; Zhao, Qingxuan; Sun, Nannan; Li, Yanzhong

    2016-01-01

    Highlights: • An ejector-enhanced LNG boil-off gas (BOG) re-liquefaction system is proposed. • The new system has an improvement of 28% in COP over the existing system. • The specific energy consumption of the new system is reduced to 0.59 kW h/kg(BOG). • The power consumption of 754.1 kW is saved in the case study. - Abstract: An ejector-enhanced Liquefied Natural Gas (LNG) boil-off gas (BOG) re-liquefaction system is proposed to improve the energy efficiency of the existing system. In the new system, two ejectors are respectively used to reduce the energy loss in the expansion of the pressurized BOG and inject a part of fuel BOG into the compression system, and a recuperator is employed to recover the cold energy of the BOG exited from LNG tank. The performance improvement of the proposed system is analysed on the basis of the simulation in Aspen HYSYS. In the case of the re-liquefaction capacity of 4557.6 kg/h, the coefficient of performance (COP) and exergy efficiency can be increased by 28%, and the specific energy consumption (SEC) reduced from 0.756 to 0.59 kW h/kg(BOG) compared to the conventional BOG re-liquefaction system. Correspondingly, the power consumption of 754.1 kW is saved. This means that applying ejectors can effectively improve the energy efficiency of the existing BOG re-liquefaction system for LNG carriers.

  9. Experimental analysis of a paraffin-based cold storage tank

    OpenAIRE

    Barbara Torregrosa-Jaime; López-Navarro, Alejandro; Corberán, José M.; Esteban-Matías, J. C.; Klinkner, L.; Payá-Herrero, Jorge

    2013-01-01

    [EN] The aim of this study is to characterize a paraffin-based cold storage tank. Novel experimental results are presented for this system which combines a significant amount of paraffin (1450 kg) immersed around 18 spiral-shaped coils disposed in counter-current flow. The paraffin has a phase-change temperature in the range 4 8 °C as measured by a 3-layer calorimeter. Different tests have been carried out with a constant mass flow rate and supply temperature. Around 31% of the paraffin has h...

  10. LNG terminalil on idaraha keeld / Raimo Poom

    Index Scriptorium Estoniae

    Poom, Raimo

    2011-01-01

    Euroopa Komisjon kiirustab Balti riike LNG (vedeldatud maagaasi) terminali asukohas kokku leppima. Kolmest tingimusest, millele peab LNG terminali projekt vastama, et tekiks võimalus kandideerida EL-i toetusele

  11. Assessment of concentration mechanisms for organic wastes in underground storage tanks at Hanford

    International Nuclear Information System (INIS)

    Gerber, M.A.; Burger, L.L.; Nelson, D.A.; Ryan, J.L.; Zollars, R.L.

    1992-09-01

    Pacific Northwest Laboratory (PNL) has conducted an initial conservative evaluation of physical and chemical processes that could lead to significant localized concentrations of organic waste constituents in the Hanford underground storage tanks (USTs). This evaluation was part of ongoing studies at Hanford to assess potential safety risks associated with USTs containing organics. Organics in the tanks could pose a potential problem if localized concentrations are high enough to propagate combustion and are in sufficient quantity to produce a large heat and/or gas release if in contact with a suitable oxidant. The major sources of oxidants are oxygen in the overhead gas space of the tanks and sodium nitrate and nitrite either as salt cake solids or dissolved in the supernatant and interstitial liquids

  12. Assessment of concentration mechanisms for organic wastes in underground storage tanks at Hanford

    Energy Technology Data Exchange (ETDEWEB)

    Gerber, M.A.; Burger, L.L.; Nelson, D.A.; Ryan, J.L. (Pacific Northwest Lab., Richland, WA (United States)); Zollars, R.L. (Washington State Univ., Pullman, WA (United States))

    1992-09-01

    Pacific Northwest Laboratory (PNL) has conducted an initial conservative evaluation of physical and chemical processes that could lead to significant localized concentrations of organic waste constituents in the Hanford underground storage tanks (USTs). This evaluation was part of ongoing studies at Hanford to assess potential safety risks associated with USTs containing organics. Organics in the tanks could pose a potential problem if localized concentrations are high enough to propagate combustion and are in sufficient quantity to produce a large heat and/or gas release if in contact with a suitable oxidant. The major sources of oxidants are oxygen in the overhead gas space of the tanks and sodium nitrate and nitrite either as salt cake solids or dissolved in the supernatant and interstitial liquids.

  13. French Gas Association roundtable - May 27, 2013. Evolutions of the LNG market

    International Nuclear Information System (INIS)

    Robin, Jean-Yves; Brunero, Francois; Cotin, Pierre; Daubonne, Jean-Francois; Deybach, Frederic; Seilhan, Bruno

    2013-01-01

    The LNG industry is currently facing contrasting trends, with overall decreasing consumption in 2012 compared to the previous year, large uncertainties on gas prices - energy being regarded by European and Asian customers as costly - and however very encouraging prospects, in particular regarding LNG as a fuel. This document reports on the minutes of the French Gas Association roundtable on the subject 'Evolutions of the LNG market'. Contents: 1) LNG Market Outlook, 2) LNG in Europe, 3) LNG terminals and the evolving LNG market, 4) The road-transported LNG market, 5) LNG market trends, 6) Questions and Answers

  14. Model based, sensor directed remediation of underground storage tanks

    International Nuclear Information System (INIS)

    Christensen, B.; Drotning, W.; Thunborg, S.

    1991-01-01

    Sensor rich, intelligent robots which function with respect to models of their environment have significant potential to reduce the time and cost for the cleanup of hazardous waste while increasing operator safety. Sandia National Laboratories is performing experimental investigations into the application of intelligent robot control technology to the problem of removing waste stored tanks. This paper describes the experimental environment employed at Saudi with particular attention to the computing and software control environment. Intelligent system control is achieved though the integration of extensive geometric and kinematic world models with real-time sensor based control. All operator interactions with the system are validate all operator commands before execution to provide a safe operation. Sensing is used to add information to the robot system's world model and to allow sensor based sensor control during selected operations. The results of a first Critical Feature Test are reported and the potential for applying advanced intelligent control concepts to the removal of waste in storage tanks is discussed

  15. Pre-commissioning, commissioning, start-up and operation of a major extension to an LNG manufacturing facility in Bintulu, Sarawak

    International Nuclear Information System (INIS)

    Wong, T.

    1997-01-01

    In 1989, a decision was taken by the Shareholders of Malaysia LNG Sdn Bhd (MLNG) to expand their existing LNG manufacturing facility of some 8.0 million tonnes per annum, and to minimise the capital investment by maximizing the use of available off-plot facilities and utilities, together with the introduction of proven technological enhancements. Accordingly a new Company (MLNG Dua) was set up to own and manage this project and joint venture between existing shareholders. This paper describes the organisation, planning, and execution of the precommissioning, commissioning, start-up, and operation of the off-plot facilities, integrated utilities, and the first new process module, such that on-grade LNG rundown into MLNG's existing storage capacity was achieved within 26 days of the process module being signed off as Ready for Start-up (RFSU). (au)

  16. Comparison between reverse Brayton and Kapitza based LNG boil-off gas reliquefaction system using exergy analysis

    Science.gov (United States)

    Kochunni, Sarun Kumar; Chowdhury, Kanchan

    2017-02-01

    LNG boil-off gas (BOG) reliquefaction systems in LNG carrier ships uses refrigeration devices which are based on reverse Brayton, Claude, Kapitza (modified Claude) or Cascade cycles. Some of these refrigeration devices use nitrogen as the refrigerants and hence nitrogen storage vessels or nitrogen generators needs to be installed in LNG carrier ships which consume space and add weight to the carrier. In the present work, a new configuration based on Kapitza liquefaction cycle which uses BOG itself as working fluid is proposed and has been compared with Reverse Brayton Cycle (RBC) on sizes of heat exchangers and compressor operating parameters. Exergy analysis is done after simulating at steady state with Aspen Hysys 8.6® and the comparison between RBC and Kapitza may help designers to choose reliquefaction system with appropriate process parameters and sizes of equipment. With comparable exergetic efficiency as that of an RBC, a Kaptiza system needs only BOG compressor without any need of nitrogen gas.

  17. In situ stabilization of mixed radioactive waste storage tanks and contaminated soil areas

    International Nuclear Information System (INIS)

    Matthern, G.E.; Meservey, R.H.

    1997-01-01

    Within the Department of Energy (DOE) Complex, there are a number of small (<50,000 gallons) underground Storage tanks containing mixed waste materials. The radioactive content of wastes eliminates the feasibility for hazardous waste treatment in accordance with previously prescribed Resource Conservation and Recovery Act (RCRA) technologies. As a result, DOE is funding in situ stabilization technology development for these tanks, Some of this development work has been done at the Idaho National Engineering and Environmental Laboratory (INEEL) and the initial efforts there were concentrated on the stabilization of the contents of the Test Area North (TAN) V-9 Tank. This is a 400 gallon underground tank filled with about 320 gallons of liquids and silty sediments. Sampling data indicates that approximately 50 wt% of the tank contents is aqueous-phase liquids. The vertically oriented cylindrical tank has a conical bottom and a chordal baffle that separates the tank inlet from its outlet. Access to the tank is through a six inch diameter access pipe on top of the tank. Because of the high volume, and the high concentration of aqueous-phase materials, Tank V-9 stabilization efforts have focussed on applying in situ agitation with dry feed addition to stabilize its contents. Materials selected for dry feed addition to this tank include a mixture of Aquaset IIH, and Type I/II Portland cement. This paper describes the results of proof-of-concept tests performed on full scale mockups of the Tank V-9. This proof-of-concept test were used to set operating parameters for in situ mixing, as well as evaluate how variations in Aquaset IIH/Portland cement ratio and sediment to liquid volume affected mixing of the tank

  18. LNG imports make strong recovery in 1996; exports increase also

    International Nuclear Information System (INIS)

    Swain, E.J.

    1998-01-01

    LNG imports to the US jumped in 1996 as Algerian base-load plants resumed operations following major revamps. Exports from Alaska to Japan grew by nearly 4% over 1995. Total LNG imports to the US in 1996 were 40.27 bcf compared to 17.92 bcf in 1995, an increase of 124.8%. Algeria supplied 35.32 bcf; Abu Dhabi, 4.95 bcf. About 82.3% of the imported LNG was received at Distrigas Corp.'s terminal north of Boston. The remaining LNG was received at the Pan National terminal in Lake Charles, LA. LNG imports during 1995 fell to such a low level not because of depressed US demand but because of limited supply. The paper discusses LNG-receiving terminals, base-load producers, LNG pricing, and exports

  19. Improvement of plant reliability in PT. Badak LNG plant

    International Nuclear Information System (INIS)

    Achmad, S.; Somantri, A.

    1997-01-01

    PT. Badak's LNG sales commitment has been steadily increasing, therefore, there has been more emphasis to improve and maintain the LNG plant reliability. From plant operation historical records, Badak LNG plant experienced a high number of LNG process train trips and down time for 1977 through 1988. The highest annual number of LNG plant trips (50 times) occurred in 1983 and the longest LNG process train down time (1259 train-hours) occurred in 1988. Since 1989, PT. Badak has been able to reduce the number of LNG process train trips and down time significantly. In 1994 the number of LNG process train trips and was 18 times and the longest LNG process train down time was 377 train-hours. This plant reliability improvement was achieved by implementing plant reliability improvement programs beginning with the design of the new facilities and continuing with the maintenance and modification of the existing facilities. To improve reliability of the existing facilities, PT. Badak has been implementing comprehensive maintenance programs, to reduce the frequency and down time of the plant, such as Preventive and Predictive Maintenance as well as procurement material improvement since PT. Badak location is in a remote area. By implementing the comprehensive reliability maintenance, PT. Badak has been able to reduce the LNG process train trips to 18 and down time to 337 train hours in 1994 with the subsequent maintenance cost reduction. The average PT. Badak plant availability from 1985 to 1995 is 94.59%. New facilities were designed according to the established PT. Badak design philosophy, master plan and specification. Design of new facilities was modified to avoid certain problems from past experience. (au)

  20. Hydrogen Peroxide Storage in Small Sealed Tanks

    International Nuclear Information System (INIS)

    Whitehead, J.

    1999-01-01

    Unstabilized hydrogen peroxide of 85% concentration has been prepared in laboratory quantities for testing material compatibility and long term storage on a small scale. Vessels made of candidate tank and liner materials ranged in volume from 1 cc to 2540 cc. Numerous metals and plastics were tried at the smallest scales, while promising ones were used to fabricate larger vessels and liners. An aluminum alloy (6061-T6) performed poorly, including increasing homogeneous decay due to alloying elements entering solution. The decay rate in this high strength aluminum was greatly reduced by anodizing. Better results were obtained with polymers, particularly polyvinylidene fluoride. Data reported herein include ullage pressures as a function of time with changing decay rates, and contamination analysis results

  1. Structural analysis of underground gunite storage tanks. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This report documents the structural analysis of the 50-ft diameter underground gunite storage tanks constructed in 1943 and located in the Oak Ridge National Laboratory (ORNL) South Tank Farm, known as Facility 3507 in the 3500-3999 area. The six gunite tanks (W-5 through W-10) are spaced in a 2 {times} 3 matrix at 60 ft on centers with 6 ft of soil cover. Each tank (Figures 1, 2, and 3) has an inside diameter of 50 ft, a 12-ft vertical sidewall having a thickness of 6 in. (there is an additional 1.5-in. inner liner for much of the height), and a spherical domed roof (nominal thickness is 10 in.) rising another 6 ft, 3 in. at the center of the tank. The thickness of both the sidewall and the domed roof increases to 30 in. near their juncture. The tank floor is nominally 3-in. thick, except at the juncture with the wall where the thickness increases to 9 in. The tanks are constructed of gunite (a mixture of Portland cement, sand, and water in the form of a mortar) sprayed from the nozzle of a cement gun against a form or a solid surface. The floor and the dome are reinforced with one layer of welded wire mesh and reinforcing rods placed in the radial direction. The sidewall is reinforced with three layers of welded wire mesh, vertical {1/2}-in. rods, and 21 horizontal rebar hoops (attached to the vertical rods) post-tensioned to 35,000 psi stress. The haunch at the sidewall/roof junction is reinforced with 17 horizontal rebar hoops post-tensioned with 35,000 to 40,000 psi stress. The yield strength of the post-tensioning steel rods is specified to be 60,000 psi, and all other steel is 40,000 psi steel. The specified 28-day design strength of the gunite is 5,000 psi.

  2. Structural analysis of underground gunite storage tanks. Environmental Restoration Program

    International Nuclear Information System (INIS)

    1995-08-01

    This report documents the structural analysis of the 50-ft diameter underground gunite storage tanks constructed in 1943 and located in the Oak Ridge National Laboratory (ORNL) South Tank Farm, known as Facility 3507 in the 3500-3999 area. The six gunite tanks (W-5 through W-10) are spaced in a 2 x 3 matrix at 60 ft on centers with 6 ft of soil cover. Each tank (Figures 1, 2, and 3) has an inside diameter of 50 ft, a 12-ft vertical sidewall having a thickness of 6 in. (there is an additional 1.5-in. inner liner for much of the height), and a spherical domed roof (nominal thickness is 10 in.) rising another 6 ft, 3 in. at the center of the tank. The thickness of both the sidewall and the domed roof increases to 30 in. near their juncture. The tank floor is nominally 3-in. thick, except at the juncture with the wall where the thickness increases to 9 in. The tanks are constructed of gunite (a mixture of Portland cement, sand, and water in the form of a mortar) sprayed from the nozzle of a cement gun against a form or a solid surface. The floor and the dome are reinforced with one layer of welded wire mesh and reinforcing rods placed in the radial direction. The sidewall is reinforced with three layers of welded wire mesh, vertical 1/2-in. rods, and 21 horizontal rebar hoops (attached to the vertical rods) post-tensioned to 35,000 psi stress. The haunch at the sidewall/roof junction is reinforced with 17 horizontal rebar hoops post-tensioned with 35,000 to 40,000 psi stress. The yield strength of the post-tensioning steel rods is specified to be 60,000 psi, and all other steel is 40,000 psi steel. The specified 28-day design strength of the gunite is 5,000 psi

  3. Energy efficiency in tank storage; Energieverbruik tankopslag kan efficienter

    Energy Technology Data Exchange (ETDEWEB)

    Molenaar, T.

    2008-07-01

    Tank storage facilities have ample opportunities for further energy conservation. Branch organization Votob set a target of 30% energy efficiency between 2005 and 2020 in a Long Term Agreement (MJA3) with the Dutch government. The past few years have been used to monitor energy use closely. [mk]. [Dutch] Bij de tankopslagbedrijven ligt nog ruimte om energie te besparen. Brancheorganisatie Votob heeft in een meerjarenafspraak (MJA3) met de Nederlandse overheid de doelstelling bepaald op 30% energie efficientie tussen 2005 en 2020. De afgelopen jaren zijn al benut om het energieverbruik goed te kunnen monitoren.

  4. Large-volume heat storage tank made of GFK; Grosswaermespeichertank aus GFK

    Energy Technology Data Exchange (ETDEWEB)

    Buehl, J.; Schultheis, P. [Technische Univ. Ilmenau (Germany). Fachgebiet Technische Thermodynamik

    1998-12-31

    The Technical University of Ilmenau, the company Verbundwerkstoff- und Kunststoffanwendungstechnik Schoenbrunn, the Institute for Aerospace and Light-weight construction of Dresden University with its approved testing facilities for plastics and the Institute for Construction Engineering in Berlin and several other institutions co-operated since 1996 in developing a concept for a series of long-term heat storage tanks up to 6,000 cubic metres storage volume made of plastic (GFK components) with a combined thermal insulation. A model tank (sandwich body with proportional thermal insulation layer and selected mixed laminates) with a volume of 1.5 cubic metres was built and installed in November 1996. The tank has been continuously operated at various test levels. The experiment proves the longevity of the materials used. (orig.) [Deutsch] In Zusammenarbeit der TU Ilmenau mit der Fa. Verbundwerkstoff - und Kunststoffanwendungstechnik Schoenbrunn und dem Institut fuer Luftfahrttechnik und Leichtbau Dresden, seiner akkredierten Pruefstelle fuer Kunststoffe, in Abstimmung mit dem Institut fuer Bautechnik Berlin und weiteren Einrichtungen und Partnern wird seit 1996 an einem Konzept fuer eine Typenreihe Langzeitwaermespeicher bis vorerst 6.000 m{sup 3} Speichervolumen aus Kunststoff (GFK-Komponenten) und kombinierter integrierter thermischer Isolation gearbeitet. Im Vorfeld dieser Entwicklung wurde auf der Basis vorausgewaehlter Materialien und Kompositionen ein Musterspeicher (ein Sandwich - Modellkoerper mit proportionaler Waermedaemmschicht sowie ausgewaehlten Mischlaminaten) mit einem Speichervolumen von 1,5 m{sup 3} realisiert. Dieser Musterspeicher wurde im November 1996 installiert und wird seither kontinuierlich in den entsprechenden Erprobungsstufen betrieben. Der Nachweis der Langlebigkeit der eingesetzten Materialien wurde experimentell erbracht. (orig.)

  5. LNG As an Alternative Energy Supply in Sweden

    Energy Technology Data Exchange (ETDEWEB)

    Hansson, Jens [Lund Univ., Dept. of Chemical Engineering, Lund (Sweden)

    2008-11-15

    As well as summarising the possible alternatives, environmental aspects and uses of LNG, this study aims to investigate the cost involved in the import of LNG to Sweden, from well to user. In Sweden, Natural Gas is used to cover 2 % of the total energy input. The pipeline network stretches from Malmoe to Stenungsund and Gnosjoe, which means some of the most densely populated areas are covered, but there is still 1200 km of the country left, including larger cities such as Stockholm, Uppsala and Linkoeping as well as areas that host some of the most energy demanding industries, e.g. Sundsvall, Umeaa, Luleaa and Kiruna. The absence of Natural Gas typically causes these regions to rely on fuel oil, coke or coal. If these sources of energy could be replaced by Natural Gas, great environmental benefits could be achieved. Research shows that the use of Natural Gas adds 20 % less CO{sub 2} to the atmosphere than oil and also mean lower emissions of NO{sub x}, SO{sub 2} and particles, making it the better alternative from both local and global perspectives. LNG is potentially a fire and an explosion hazard, but in the last 45 years of usage, no major accidents have occurred. Major exporters of LNG are Indonesia, Quatar, Australia and Algeria. Some of the largest importers are Japan, USA, France and Spain. Japan imports nearly 100 % of their Natural Gas as LNG. The available LNG liquefaction capacity increased by 60 % between 2002 and 2007. The total import cost for LNG includes the purchase cost from the producer, the transport cost, be it sea, railroad or road transport, and the cost for the terminal which receives and stores LNG. The study of different routes, volumes and means of transport creates a picture of how the total cost varies in proportion to these parameters. In the calculation of these costs, sources from the industry or estimations of purchase prices, transport costs and terminal costs are used. The uncertainties in this study are especially high when it

  6. LNG As an Alternative Energy Supply in Sweden

    Energy Technology Data Exchange (ETDEWEB)

    Hansson, Jens (Lund Univ., Dept. of Chemical Engineering, Lund (Sweden))

    2008-11-15

    As well as summarising the possible alternatives, environmental aspects and uses of LNG, this study aims to investigate the cost involved in the import of LNG to Sweden, from well to user. In Sweden, Natural Gas is used to cover 2 % of the total energy input. The pipeline network stretches from Malmoe to Stenungsund and Gnosjoe, which means some of the most densely populated areas are covered, but there is still 1200 km of the country left, including larger cities such as Stockholm, Uppsala and Linkoeping as well as areas that host some of the most energy demanding industries, e.g. Sundsvall, Umeaa, Luleaa and Kiruna. The absence of Natural Gas typically causes these regions to rely on fuel oil, coke or coal. If these sources of energy could be replaced by Natural Gas, great environmental benefits could be achieved. Research shows that the use of Natural Gas adds 20 % less CO{sub 2} to the atmosphere than oil and also mean lower emissions of NO{sub x}, SO{sub 2} and particles, making it the better alternative from both local and global perspectives. LNG is potentially a fire and an explosion hazard, but in the last 45 years of usage, no major accidents have occurred. Major exporters of LNG are Indonesia, Quatar, Australia and Algeria. Some of the largest importers are Japan, USA, France and Spain. Japan imports nearly 100 % of their Natural Gas as LNG. The available LNG liquefaction capacity increased by 60 % between 2002 and 2007. The total import cost for LNG includes the purchase cost from the producer, the transport cost, be it sea, railroad or road transport, and the cost for the terminal which receives and stores LNG. The study of different routes, volumes and means of transport creates a picture of how the total cost varies in proportion to these parameters. In the calculation of these costs, sources from the industry or estimations of purchase prices, transport costs and terminal costs are used. The uncertainties in this study are especially high when it

  7. International Clean Energy System Using Hydrogen Conversion (WE-NET). subtask 5. Development of hydrogen transport/storage technology (development of storage facility for liquid hydrogen); Suiso riyo kokusai clean energy system gijutsu (WE-NET). subtask 5. Suiso yuso chozo gijutsu no kaihatsu (ekitai suiso chozo setsubi no kaihatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    As a part of the WE-NET project, the storage facility for a large amount of liquid hydrogen (LH) was studied. Gasification loss caused by heat input of LH delivery pumps was studied for liquefaction and power generation bases assuming an pump efficiency of 70%, and the total heat and mass balance such as interface conditions for calculating the amount of boil-off gas was reviewed. The target storage capacity of 50,000m{sup 3} was reasonable, however, the performance of loading arms should be examined. The capacity around 5,000m{sup 3} of coastal localized bases was reasonable for control delivery loss caused by coastal tanker or LH container system to 2.6%. The capacity of 500m{sup 3} was suitable for inland bases, resulting in the loss of 1.2%. The concept design of the storage tank of 50,000m{sup 3} extracted confirmation of low-temperature characteristics of adiabatic materials and structures, and development of leakage inspection technology and vacuum holding technology as issues. The concept design of the underground storage tank showed that the material specifications for LNG ones are applicable to it by using proper adiabatic structures. 4 refs., 72 figs., 27 tabs.

  8. The conception of the LNG implementation in Poland

    International Nuclear Information System (INIS)

    Skwarczynski, S.; Zola, P.

    2006-01-01

    The main issues concerning world LNG market, technical applications and the potential growth of the market have been described in the article. The conception of introducing LNG on Polish gas market assumes that a LNG terminal will be built on the Baltic Sea shore along with the infrastructure necessary to store and transmit gas to the national gas pipeline grid. (authors)

  9. LNG in transportation

    International Nuclear Information System (INIS)

    Madden, Mike; White, Nick; Le Fevre, Chris

    2014-01-01

    This document summarizes the content of a 402 p. study published by CEDIGAZ, the International Center for Natural Gas Information. According to this study, LNG as a fuel will capture a significant market share in the transport sector by 2035. The greatest potential is seen in road transport, were annual demand is projected to reach 96 million tons per year (mtpa) in CEDIGAZ' base scenario while demand in the marine sector could grow to an estimated 77 mtpa. The rail sector could add another 6 mtpa to global demand. However, the development of LNG as a transport fuel faces a number of challenges, and will have to go hand in hand with the development of fueling infrastructure

  10. AX Tank Farm tank removal study

    International Nuclear Information System (INIS)

    SKELLY, W.A.

    1998-01-01

    This report considers the feasibility of exposing, demolishing, and removing underground storage tanks from the 241-AX Tank Farm at the Hanford Site. For the study, it was assumed that the tanks would each contain 360 ft 3 of residual waste (corresponding to the one percent residual Inventory target cited in the Tri-Party Agreement) at the time of demolition. The 241-AX Tank Farm is being employed as a ''strawman'' in engineering studies evaluating clean and landfill closure options for Hanford single-shell tank farms. The report is one of several reports being prepared for use by the Hanford Tanks Initiative Project to explore potential closure options and to develop retrieval performance evaluation criteria for tank farms

  11. Nonlinear Modeling and Application of PI Control on Pre-cooling Session of a Carbon Dioxide Storage Tank at Normal Temperature and Pressure

    Energy Technology Data Exchange (ETDEWEB)

    Lim, Yu Kyung; Lee, Seok Goo; Dan, Seungkyu; Lee, Jong Min [Seoul National University, Seoul (Korea, Republic of); Ko, Min Su [Samsung Heavy Industries, Geoje (Korea, Republic of)

    2014-10-15

    Storage tanks of Carbon dioxide (CO{sub 2}) carriers utilized for the purpose of carbon capture and storage (CCS) into subsea strata have to undergo a pre-cooling session before beginning to load cryogenic liquid cargos in order to prevent physical and thermal deterioration of tanks which may result from cryogenic CO{sub 2} contacting tank walls directly. In this study we propose dynamic model to calculate the tank inflow of CO{sub 2} gas injected for precooling process and its dynamic simulation results under proportional-integral control algorithm. We selected two cases in which each of them had one controlled variable (CV) as either the tank pressure or the tank temperature and discussed the results of that decision-making on the pre-cooling process. As a result we demonstrated that the controlling instability arising from nonlinearity and singularity of the mathematical model could be avoided by choosing tank pressure as CV instead of tank temperature.

  12. Vibro Replacement, Dynamic Compaction, and Vibro Compaction case histories for petroleum storage tank facilities

    Energy Technology Data Exchange (ETDEWEB)

    Beaton, N; Scott, J. [Geopac West Ltd., Richmond, BC (Canada)

    2010-07-01

    This paper discussed approaches to tank farm ground improvement via 3 Canadian ground improvement case histories in order to set forth the advantages of ground improvement for foundation support at petroleum storage tank facilities. Each case study featured a particular set of site conditions, performance criteria, and ground improvement techniques selected to attain the desired foundation performance. The first case study involved a Vibro Replacement stone column to meet strict seismicity requirements, the second employed Dynamic Compaction to mitigate deep variable fill within a former gravel pit, and the last encompassed Vibro Compaction applied to a site with a sand fill soil profile. The site conditions, the design requirements, the ground improvement solution, the execution, and the quality control techniques and results were presented for each case history. Soil reinforcement and ground improvement to treat loose and soft soils below heavy storage tanks can be an economical solution to foundation design challenges. However, it is important to select proper methods and tailor the densification programs to the specific subsoil conditions and design requirements. In each application, the selected ground improvement technique exceeded the specified in-situ testing requirements. 3 refs., 9 figs.

  13. Indian Country Leaking Underground Storage Tank (LUST) Points, Region 9, 2016, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — This GIS dataset contains point features that represent Leaking Underground Storage Tanks in US EPA Region 9 Indian Country. This dataset contains facility name and...

  14. Temperature distribution of a hot water storage tank in a simulated solar heating and cooling system

    Science.gov (United States)

    Namkoong, D.

    1976-01-01

    A 2,300-liter hot water storage tank was studied under conditions simulating a solar heating and cooling system. The initial condition of the tank, ranging from 37 C at the bottom to 94 C at the top, represented a condition midway through the start-up period of the system. During the five-day test period, the water in the tank gradually rose in temperature but in a manner that diminished its temperature stratification. Stratification was found not to be an important factor in the operation of the particular solar system studied.

  15. Thermoeconomic optimization of a cryogenic refrigeration cycle for re-liquefaction of the LNG boil-off gas

    Energy Technology Data Exchange (ETDEWEB)

    Sayyaadi, Hoseyn; Babaelahi, M. [Faculty of Mechanical Engineering-Energy Division, K.N. Toosi University of Technology, P.O. Box: 19395-1999, No. 15-19, Pardis Str., Mollasadra Ave., Vanak Sq., Tehran 1999 143344 (Iran)

    2010-09-15

    The development of the liquefaction process for the Liquefied Natural Gas (LNG) boil-off re-liquefaction plants will be addressed to provide an environmentally friendly and cost effective solution for the gas transportation. In this manner, onboard boil-off gas (BOG) re-liquefaction system as a cryogenic refrigeration cycle is utilized in order to re-liquefy the BOG and returns it to the cargo tanks instead of burning it. In this paper, a thermoeconomic optimization of the LNG-BOG liquefaction system is performed. A thermoeconomic model based on energy and exergy analyses and an economic model according to the total revenue requirement (TRR) are developed. Minimizing of the unit cost of the refrigeration effect as a product of BOG re-liquefaction plant is performed using the genetic algorithm. Results of thermoeconomic optimization are compared with corresponding features of the base case system. Finally, sensitivity of the total cost of the system product with respect to the variation of some operating parameters is studied. (author)

  16. Safety and environmental aspects in LNG carrier design

    International Nuclear Information System (INIS)

    Takashi Yoneyama

    1997-01-01

    'Safety and Reliability' has been and will continue to be a key phr ase in marine transportation of LNG. Mitsui Engineering and Shipbuilding Co.,Ltd. has utilized its all expertise and state of art technologies to realize this objective, resulting in exceptionally successful operations of LNG carrier built by the Co. In line with growing global concern about environmental issues, we need to pay more attention to the environmental aspects of the design and construction of LNG carriers. Accordingly, in this paper, we present some topics related safety and environmental concerns which need to be taken into consideration in LNG carriers design and construction. (Author). 7 figs

  17. Safety and environmental aspects in LNG carrier design

    Energy Technology Data Exchange (ETDEWEB)

    Yoneyama, Takashi [Mitsui Shipbuilding and Engineering Co. Ltd., Tokyo (Japan)

    1997-06-01

    `Safety and Reliability` has been and will continue to be a key phr ase in marine transportation of LNG. Mitsui Engineering and Shipbuilding Co.,Ltd. has utilized its all expertise and state of art technologies to realize this objective, resulting in exceptionally successful operations of LNG carrier built by the Co. In line with growing global concern about environmental issues, we need to pay more attention to the environmental aspects of the design and construction of LNG carriers. Accordingly, in this paper, we present some topics related safety and environmental concerns which need to be taken into consideration in LNG carriers design and construction. (Author). 7 figs.

  18. Los Alamos National Laboratory environmental restoration program group audit report for underground storage tank removal: Audit ER-92- 04, July 22--August 11, 1992

    International Nuclear Information System (INIS)

    Gillespie, P.F.

    1992-01-01

    Audit ER-92-04 was conducted on activities being performed by Waste Management (EM-7), Environmental Protection (EM-8), and Environmental Restoration (EM-13) groups for the LANL's underground storage tank removal program. Scope of the audit was limited to an evaluation of the implementation of the State of New Mexico requirements for underground storage-tank removal. Activities were evaluated using requirements specified in the State of New Mexico Environmental Improvement Board Underground Storage Tank Regulations, EIB/USTR. Two recommendations are made: (1) that a single organization be given the responsibility and authority for the implementation of the program, and (2) that the requirements of the NM State environmental improvement board underground storage tank regulations be reviewed and a Los Alamos procedure written to address requirements and interfaces not contained in SOP-EM7-D ampersand D-001

  19. Device for sealing and shielding a nuclear fuel storage tank

    International Nuclear Information System (INIS)

    Masaki, Gengo.

    1975-01-01

    Object: To provide a shield device for opening and closing a great opening in a relay-storage-tank within a hot cell for temporarily storing a nuclear fuel, in which the device is simplified in construction and which can perform the opening and closing operation in simple, positive and quick manner. Structure: A biological shield is positioned upwardly of an opening of a nuclear fuel storage tank to render an actuator inoperative. A sealing plate, which is pivotally supported by a plurality of support rod devices from the biological shield for parallel movement with respect to the biological shield, comes in contact with a resilient seal disposed along the entire peripheral edge of the opening to form an air-tight seal therebetween. In order to release the opening, the actuator is first actuated and the end of the sealing plate is horizontally pressed by a piston rod thereof. Then, the sealing plate is moved along the line depicted by the end of the support rod in the support rod devices and as a consequence, the plate is moved away from the resilient seal in the peripheral edge of the opening. When a driving device is actuated to travel the plate along the aforesaid line while maintaining the condition as described, the biological device moves along the guide. (Kamimura, M.)

  20. Development of in-structure design spectra for dome mounted equipment on underground waste storage tanks at the Hanford Site

    International Nuclear Information System (INIS)

    Julyk, L.J.

    1995-09-01

    In-structure response spectra for dome mounted equipment on underground waste storage tanks at the Hanford Site are developed on the basis of recent soil-structure-interaction analyses. Recommended design spectra are provided for various locations on the tank dome

  1. Physico-chemical characteristics and methanogen communities in swine and dairy manure storage tanks: spatio-temporal variations and impact on methanogenic activity.

    Science.gov (United States)

    Barret, Maialen; Gagnon, Nathalie; Topp, Edward; Masse, Lucie; Massé, Daniel I; Talbot, Guylaine

    2013-02-01

    Greenhouse gas emissions represent a major environmental problem associated with the management of manure from the livestock industry. Methane is the primary GHG emitted during manure outdoor storage. In this paper, the variability of two swine and two dairy manure storage tanks was surveyed, in terms of physico-chemical and microbiological parameters. The impact of the inter-tank and spatio-temporal variations of these parameters on the methanogenic activity of manure was ascertained. A Partial Least Square regression was carried out, which demonstrated that physico-chemical as well as microbiological parameters had a major influence on the methanogenic activity. Among the 19 parameters included in the regression, the concentrations of VFAs had the strongest negative influence on the methane emission rate of manure, resulting from their well-known inhibitory effect. The relative abundance of two amplicons in archaeal fingerprints was found to positively influence the methanogenic activity, suggesting that Methanoculleus spp. and possibly Methanosarcina spp. are major contributors to methanogenesis in storage tanks. This work gave insights into the mechanisms, which drive methanogenesis in swine and dairy manure storage tanks. Crown Copyright © 2012. Published by Elsevier Ltd. All rights reserved.

  2. Resource Conservation and Recovery Act (RCRA) Part B permit application for tank storage units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1994-05-01

    In compliance with the Resource Conservation and Recovery Act (RCRA), this report discusses information relating to permit applications for three tank storage units at Y-12. The storage units are: Building 9811-1 RCRA Tank Storage Unit (OD-7); Waste Oil/Solvent Storage Unit (OD-9); and Liquid Organic Solvent Storage Unit (OD-10). Numerous sections discuss the following: Facility description; waste characteristics; process information; groundwater monitoring; procedures to prevent hazards; contingency plan; personnel training; closure plan, post closure plan, and financial requirements; record keeping; other federal laws; organic air emissions; solid waste management units; and certification. Sixteen appendices contain such items as maps, waste analyses and forms, inspection logs, equipment identification, etc

  3. Numerical model for the thermal behavior of thermocline storage tanks

    Science.gov (United States)

    Ehtiwesh, Ismael A. S.; Sousa, Antonio C. M.

    2018-03-01

    Energy storage is a critical factor in the advancement of solar thermal power systems for the sustained delivery of electricity. In addition, the incorporation of thermal energy storage into the operation of concentrated solar power systems (CSPs) offers the potential of delivering electricity without fossil-fuel backup even during peak demand, independent of weather conditions and daylight. Despite this potential, some areas of the design and performance of thermocline systems still require further attention for future incorporation in commercial CSPs, particularly, their operation and control. Therefore, the present study aims to develop a simple but efficient numerical model to allow the comprehensive analysis of thermocline storage systems aiming better understanding of their dynamic temperature response. The validation results, despite the simplifying assumptions of the numerical model, agree well with the experiments for the time evolution of the thermocline region. Three different cases are considered to test the versatility of the numerical model; for the particular type of a storage tank with top round impingement inlet, a simple analytical model was developed to take into consideration the increased turbulence level in the mixing region. The numerical predictions for the three cases are in general good agreement against the experimental results.

  4. Moment of inertia of liquid in a tank

    Directory of Open Access Journals (Sweden)

    Lee Gyeong Joong

    2014-03-01

    Full Text Available In this study, the inertial properties of fully filled liquid in a tank were studied based on the potential theory. The analytic solution was obtained for the rectangular tank, and the numerical solutions using Green’s 2nd identity were obtained for other shapes. The inertia of liquid behaves like solid in recti-linear acceleration. But under rotational acceleration, the moment of inertia of liquid becomes small compared to that of solid. The shapes of tank investigated in this study were ellipse, rectangle, hexagon, and octagon with various aspect ratios. The numerical solu¬tions were compared with analytic solution, and an ad hoc semi-analytical approximate formula is proposed herein and this formula gives very good predictions for the moment of inertia of the liquid in a tank of several different geometrical shapes. The results of this study will be useful in analyzing of the motion of LNG/LPG tanker, liquid cargo ship, and damaged ship.

  5. Moment of inertia of liquid in a tank

    Directory of Open Access Journals (Sweden)

    Gyeong Joong Lee

    2014-03-01

    Full Text Available In this study, the inertial properties of fully filled liquid in a tank were studied based on the potential theory. The analytic solution was obtained for the rectangular tank, and the numerical solutions using Green's 2nd identity were obtained for other shapes. The inertia of liquid behaves like solid in recti-linear acceleration. But under rotational acceleration, the moment of inertia of liquid becomes small compared to that of solid. The shapes of tank investigated in this study were ellipse, rectangle, hexagon, and octagon with various aspect ratios. The numerical solutions were compared with analytic solution, and an ad hoc semi-analytical approximate formula is proposed herein and this formula gives very good predictions for the moment of inertia of the liquid in a tank of several different geometrical shapes. The results of this study will be useful in analyzing of the motion of LNG/LPG tanker, liquid cargo ship, and damaged ship.

  6. Analytical and experimental comparisons of modal properties of a flood water storage tank

    International Nuclear Information System (INIS)

    Thinnes, G.L.; Dooley, W.T.; Gorman, V.W.

    1986-01-01

    Comparisons of measured frequencies, mode shapes, and damping from experimental modal testing and analytical predictions have been performed on a vertically standing 90,000 liter flood water storage tank. The purpose of the study was to compare the accuracy of analytical calculations with experimentally obtained data. The need for this comparison arises because safety assessments of the integrity of such vessels are normally based upon analyses which have not usually been validated by experiments. The tank was excited using random input from an electromagnetic shaker. Data reduction was performed using frequency response functions. Analyses, including modal analysis calculations, were performed on the tank for three water level conditions using finite element methods. Results of the analyses are presented, comparisons to test data are shown, and conclusions and recommendations are made as a result of these studies. 5 refs., 8 figs., 2 tabs

  7. LNG in eastern Canada and New England : market update

    International Nuclear Information System (INIS)

    Schlesinger, B.

    2005-01-01

    This presentation provided an overview of the gas markets in North America and discussed the rationale for developing the liquefied natural gas (LNG) market with reference to competitive issues, challenges and global dimensions. LNG is expected to play a greater role in North American gas supplies and markets due to the decrease in conventional natural gas production in North America and the increase in demand for energy. It is expected that the overall share of the LNG gas market will increase in 2002. The construction of at least 15 new LNG receiving terminals has been proposed for location in the U.S., Canada, and Mexico, with most being located along the Gulf Coast. A novel offshore LNG receiving concept involving offshore gas pipelines and on-board-ship regasification was also discussed. As trading of LNG increases in the Atlantic, markets in eastern United States and Canada will benefit from improved gas supplies. Pricing patterns are also expected to change. It was noted that the increased energy demand will enable Arctic gas supplies to enter markets. As such, Arctic gas pipelines will enter service in the next decade and Alberta's importance as a hub will grow. It was also noted that Arctic gas will not have a significant influence on reducing LNG import volumes. figs

  8. LNG : its potential impact on North American markets

    International Nuclear Information System (INIS)

    Schlesinger, B.

    2003-01-01

    Liquefied natural gas (LNG) is expected to play a greater role in North American gas supplies and markets due to the decrease in conventional natural gas production in North America accompanied by an increase in demand for energy. It is expected that the overall share of the LNG gas market will rise from about 1.4 per cent in 2002 to more than 5 per cent by 2020, and potentially up to 15 per cent by that year. The construction of at least 15 new LNG receiving terminals has been proposed for location in the U.S., Canada, and Mexico. In addition, El Paso has proposed a novel offshore LNG receiving concept involving offshore gas pipelines and on-board-ship regasification. As trading of LNG increases in the Atlantic, markets in eastern United States and Canada will benefit from improved gas supplies, but pricing patterns are expected to change. Basis differentials along the Atlantic coastline will probably diminish, potentially reducing the value of Sable Island gas and the pipeline system that runs north to south along the eastern coast of North America. It was noted that Middle Eastern suppliers of LNG will play an important potential role in North American markets. 19 figs

  9. Gas storage facilities. Investigation of their social value

    International Nuclear Information System (INIS)

    1997-02-01

    The socio-economic factors resulting from location of gas storage facilities are evaluated. Various alternatives to the existing projects are estimated, for instance 11 new pipelines, in some cases combined with new production capacity, LNG facilities, differentiated tariffs, reconstruction of decentralized heat/power plants etc. Theoretical considerations and models, among others involving gas storage abroad, are presented. Seasonal storage, emergency storage, storage controlled by economic optimization (profitable purchases, sales at highest market) are described for various types of facilities, like aquifers, caverns and LNG-stores. Natural gas supplies in Europe, infrastructure and resources are compared to the Danish conditions. Sensitivity of the Danish heating market for natural gas consumption is investigated. Reduction in energy use for space heating by 2005 will change the needs of storage of 740 Mm 3 gas to 650 Mm 3 . Extra consumption by the decentralized power/heat plants is not accounted for in this estimation. Dynamic models of the future gas consumption are based on the EU 'European Energy 2020'. (EG)

  10. The underground storage tank is the key; Der Speicher ist der Schluessel

    Energy Technology Data Exchange (ETDEWEB)

    Meyer, Jens-Peter

    2013-08-06

    Plus energy houses also succeed withoutpassive house insulation. Because the combination of solar collectors, ventilation and heat pump achieves excellent energy efficiency, if one preserves the solar heat in an underground storage tank. [German] Plusenergiehaeuser gelingen auch ohne Passivhausdaemmung. Denn die Kombination von Sonnenkollektoren, Lueftung und Waermepumpe erreicht eine ausgezeichnete energetische Effizienz, sofern man die Solarwaerme in einem Erdspeicher konserviert.

  11. Experimental determination of the heat transfer and cold storage characteristics of a microencapsulated phase change material in a horizontal tank

    International Nuclear Information System (INIS)

    Allouche, Yosr; Varga, Szabolcs; Bouden, Chiheb; Oliveira, Armando C.

    2015-01-01

    Highlights: • Cold storage characteristics in latent and sensible heat storage mediums were studied. • Thermo-physical characterization of the phase change material was carried out. • A non-Newtonian shear thickening behavior of the phase change material was observed. • An energy storage enhancement (53%) was observed in the latent heat storage medium. - Abstract: In the present paper, the performance of a microencapsulated phase change material (in 45% w/w concentration) for low temperature thermal energy storage, suitable for air conditioning applications is studied. The results are compared to a sensible heat storage unit using water. Thermo-physical properties such as the specific heat, enthalpy variation, thermal conductivity and density are also experimentally determined. The non-Newtonian shear-thickening behavior of the phase change material slurry is quantified. Thermal energy performance is experimentally determined for a 100 l horizontal tank. The heat transfer between the heat transfer fluid and the phase change material was provided by a tube-bundle heat exchanger inside the tank. The results show that the amount of energy stored using the phase change material is 53% higher than for water after 10 h of charging, for the same storage tank volume. It was found that the heat transfer coefficient between the phase change material and the tube wall increases during the phase change temperature range, however it remains smaller than the values obtained for water

  12. Review of sensors for the in situ chemical characterization of the Hanford underground storage tanks

    International Nuclear Information System (INIS)

    Kyle, K.R.; Mayes, E.L.

    1994-01-01

    Lawrence Livermore National Laboratory (LLNL), in the Technical Task Plan (TTP) SF-2112-03 subtask 2, is responsible for the conceptual design of a Raman probe for inclusion in the in-tank cone penetrometer. As part of this task, LLNL is assigned the further responsibility of generating a report describing a review of sensor technologies other than Raman that can be incorporated in the in-tank cone penetrometer for the chemical analysis of the tank environment. These sensors would complement the capabilities of the Raman probe, and would give information on gaseous, liquid, and solid state species that are insensitive to Raman interrogation. This work is part of a joint effort involving several DOE laboratories for the design and development of in-tank cone penetrometer deployable systems for direct UST waste characterization at Westinghouse Hanford Company (WHC) under the auspices of the U.S. Department of Energy (DOE) Underground Storage Tank Integrated Demonstration (UST-ID)

  13. Review of sensors for the in situ chemical characterization of the Hanford underground storage tanks

    Energy Technology Data Exchange (ETDEWEB)

    Kyle, K.R.; Mayes, E.L.

    1994-07-29

    Lawrence Livermore National Laboratory (LLNL), in the Technical Task Plan (TTP) SF-2112-03 subtask 2, is responsible for the conceptual design of a Raman probe for inclusion in the in-tank cone penetrometer. As part of this task, LLNL is assigned the further responsibility of generating a report describing a review of sensor technologies other than Raman that can be incorporated in the in-tank cone penetrometer for the chemical analysis of the tank environment. These sensors would complement the capabilities of the Raman probe, and would give information on gaseous, liquid, and solid state species that are insensitive to Raman interrogation. This work is part of a joint effort involving several DOE laboratories for the design and development of in-tank cone penetrometer deployable systems for direct UST waste characterization at Westinghouse Hanford Company (WHC) under the auspices of the U.S. Department of Energy (DOE) Underground Storage Tank Integrated Demonstration (UST-ID).

  14. Tank 241-BY-111 tank characterization plan

    International Nuclear Information System (INIS)

    Homi, C.S.

    1994-01-01

    The sampling and analytical needs associated with the 51 Hanford Site underground storage tanks classified on one or more of the four Watch Lists (ferrocyanide, organic, flammable gas, and high heat), and the safety screening of all 177 tanks have been identified through the Data Quality Objective (DQO) process. DQO's identify information needed by a program group in the Tank Waste Remediation System concerned with safety issues, regulatory requirements, or the transporting and processing of tank waste. This Tank Characterization Plan will identify characterization objectives for Tank BY-111 pertaining to sample collection, sample preparation and analysis, and laboratory analytical evaluation and reporting requirements. In addition, an estimate of the current contents and status of the tank is given

  15. Position paper, need for additional waste storage capacity and recommended path forward for project W-236a, Multi-function Waste Tank Facility

    International Nuclear Information System (INIS)

    Awadalla, N.G.

    1994-01-01

    Project W-236a, Multi-function waste Tank Facility (MWTF), was initiated to increase the safe waste storage capacity for the Tank Waste Remediation System (TWRS) by building two new one million gallon underground storage tanks in the 200 West Area and four tanks in the 200 East Area. Construction of the tanks was scheduled to begin in September 1994 with operations beginning in calendar year (CY) 1998. However, recent reviews have raised several issues regarding the mission, scope, and schedule of the MWTF. The decision to build new tanks must consider several elements, such as: Operational risk and needs -- Operational risk and flexibility must be managed such that any identified risk is reduced as soon as practicable; The amount of waste that will be generated in the future -- Additional needed tank capacity must be made available to support operations and maintain currently planned safety improvement activities; Safety issues -- The retrieval of waste from single-shell tanks (SSTs) and watch list tanks will add to the total amount of waste that must be stored in a double-shell tank (DST); Availability of existing DSTs -- The integrity of the 28 existing DSTs must be continuously managed; and Affect on other projects and programs -- Because MWTF systems have been integrated with other projects, a decision on one project will affect another. In addition the W-236a schedule is logically tied to support retrieval and safety program plans. Based on the above, two new tanks are needed for safe waste storage in the 200 West Area, and they need to be built as soon as practicable. Design should continue for the tanks in the 200 East Area with a decision made by September, on whether to construct them. Construction of the cross-site transfer line should proceed as scheduled. To implement this recommendation several actions need to be implemented

  16. C-tank transfers: Transuranic sludge removal from the C-1, C-2, and W-23 waste storage tanks at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Dahl, T.L.; Lay, A.C.; Taylor, S.A.; Moore, J.W.

    1999-01-01

    Two fluidic pulse jet mixing systems were used to successfully mobilize remote-handled transuranic sludge for retrieval from three 50,000-gal horizontal waste storage tanks at Oak Ridge National Laboratory (ORNL). The results of this operation indicate that the pulse jet system should be considered for mixing and bulk retrieval of sludges in other vertical and horizontal waste tanks at ORNL and at other U.S. Department of Energy sites

  17. An Investigation of the Mechanical Properties of a Weldment of 7% Nickel Alloy Steels

    Directory of Open Access Journals (Sweden)

    Jeong Yeol Park

    2016-11-01

    Full Text Available During the last decade, the demand for natural gas has steadily increased for the prevention of environmental pollution. For this reason, many liquefied natural gas (LNG carriers have been manufactured. Since one of the most important issues in the design of LNG carriers is to guarantee structural safety, the use of low-temperature materials is increasing. Among commonly employed low-temperature materials, nickel steel has many benefits such as good strength and outstanding corrosion resistance. Accordingly, nickel steels are one of the most commonly used low-temperature steels for LNG storage tanks. However, the study of fracture toughness with various welding consumables of 7% nickel alloy steel is insufficient for ensuring the structural safety of LNG storage tanks. Therefore, the aim of this study was to evaluate fracture toughness of several different weldments for 7% nickel alloy steels. The weldment of 7% nickel alloy steel was fabricated by tungsten inert gas (TIG, flux cored arc welding (FCAW, and gas metal arc welding (GMAW. In order to assess the material performance of the weldments at low temperature, fracture toughness such as crack tip opening displacement (CTOD and the absorbed impact energy of weldments were compared with those of 9% nickel steel weldments.

  18. Experimentation of a Solar Water Heater with Integrated Storage Tank

    International Nuclear Information System (INIS)

    Elhmidi, I; Frikha, N; Chaouchi, B; Gabsi, S

    2009-01-01

    An integrated collector storage (ICS) solar water heater was constructed in 2004 and studied its optical and thermal performance. It was revealed that it has some thermal shortcomings of thermal performances. The ICS system consists of one cylindrical horizontal tank properly mounted in a stationary symmetrical Compound Parabolic Concentrating (CPC) reflector trough. The main objective was to delimit the causes of these deficiencies and trying to diagnose them. A rigorous experimentation of the solar water heater has been done over its daily energetic output as well as the evolution of the nocturnal thermal losses. In fact, three successive days, including nights, of operation have permitted to obtain diagrams describing the variations of mean temperature in the tank and the thermal loss coefficient during night of our installation. The experimental results, compared with those obtained by simulation, showed a perfecting of thermal performances of system which approach from those of other models introduced on the international market

  19. Combined cooling and purification system for nuclear reactor spent fuel pit, refueling cavity, and refueling water storage tank

    Science.gov (United States)

    Corletti, Michael M.; Lau, Louis K.; Schulz, Terry L.

    1993-01-01

    The spent fuel pit of a pressured water reactor (PWR) nuclear power plant has sufficient coolant capacity that a safety rated cooling system is not required. A non-safety rated combined cooling and purification system with redundant branches selectively provides simultaneously cooling and purification for the spent fuel pit, the refueling cavity, and the refueling water storage tank, and transfers coolant from the refueling water storage tank to the refueling cavity without it passing through the reactor core. Skimmers on the suction piping of the combined cooling and purification system eliminate the need for separate skimmer circuits with dedicated pumps.

  20. Characterization of underground storage tank sludge using fourier transform infrared photoacoustic spectroscopy

    International Nuclear Information System (INIS)

    Luo, S.; Bajic, S.J.; Jones, R.W.

    1994-01-01

    Analysis of underground storage tank (UST) contents is critical for the determination of proper disposal protocols and storage procedures of nuclear waste materials. Tank volume reduction processes during the 1940's and 50's have produced a waste form that compositionally varies widely and has a consistency that ranges from paste like sludge to saltcake. The heterogeneity and chemical reactivity of the waste form makes analysis difficult by most conventional methods which require extensive sample preparation. In this paper, a method is presented to characterize nuclear waste from UST's at the Westinghouse Hanford Site in Washington State, using Fourier transform infrared-photoacoustic spectroscopy (FTIR-PAS). FTIR-PAS measurements on milligram amounts of surrogate sludge samples have been used to accurately identify phosphate, sulfate, nitrite, nitrate and ferrocyanide components. A simple sample preparation method was followed to provide a reproducible homogeneous sample for quantitative analysis. The sample preparation method involved freeze drying the sludge sample prior to analysis to prevent the migration of soluble species. Conventional drying (e.g., air or, oven) leads to the formation of crystals near the surface where evaporation occurs. Sample preparation as well as the analytical utility of this method will be discussed

  1. The LNG industry - 2008

    International Nuclear Information System (INIS)

    2008-01-01

    The average annual growth of the world primary energy consumption has been 2.2% over the last ten years, with the highest growth rate observed for 2004 (+4.7%). In 2007, world primary energy consumption registered a 2.4% increase, still exceeding the 10-year average but less than for the four previous years. As for the previous years, the Asia Pacific region shows the most important increase in volume for 2007, rising by 5% and accounting for two-third of the global growth (China alone accounts in 2007 for more than half of this global growth, as was already the case in 2005 and 2006). Over the last ten years, the world energy consumption rose from 8920 10 6 toe in 1998 to 11099 10 6 toe in 2007, a 24.4% overall increase. For the seventh year running, coal has increased its share of the overall energy market, up to 28.6%. It should be noted that nuclear power decreased by 2%, Germany and Japan accounting for more than 90% of this decline. The growth of natural gas consumption in 2007 (+3.1%) was higher than in 2006 (+2.4%). The US accounted for nearly half of the global increase. Strong growth was also observed in China (+19.9%), representing the second largest increment to world gas consumption. Inversely, the EU consumption decreased (-1.6%) for the second year in a row. The market share for natural gas remained stable in 2007 (23.8%) compared to 2006 (23.6%)(1). Estimates for the marketed production of natural gas in 2008(2) show a rise of about 3.4% over 2007. The share of LNG in the gas trade accounts for 27% of the total (excluding trade within the Former Soviet Union and United Arab Emirates). Details are given about: LNG contracts and trade, Contracts concluded in 2008, LNG imports - Sources of imports, Quantities received in 2008, LNG tankers, Ships delivered, Tanker distribution, Liquefaction plants, Re-gasification plants, Contracts in force in 2008, Spot and short term quantities received in 2008, Sea transportation routes, Liquefaction plants, Re

  2. High efficient heat pump system using storage tanks to increase COP by means of the ISEC concept - Part 1: Model validation

    DEFF Research Database (Denmark)

    Rothuizen, Erasmus; Elmegaard, Brian; Markussen, Wiebke B.

    2015-01-01

    The purpose of the ISEC concept is to provide a high-efficient heat pump system for hot water production.The ISEC concept uses two storage tanks for the water, one discharged and one charged. Hot water for theindustrial process is tapped from the charged tank, while the other tank is charging....... This result in a lower condensingtemperature than if the water was heated in one step. Two test setups were built, one to test the performanceof the heat pump gradually heating the water and one to investigate the stratification in the storage tanks.Furthermore, a dynamic model of the system was implemented....... Charging is done bycirculating the water in the tank through the condenser of a heat pump several times and thereby graduallyheating the water. The charging is done with a higher mass flow rate than the discharging to reach severalcirculations of the water during the time frame of one discharging...

  3. Lower Colorado River GRP Underground Storage Tank Sites (Closed), Nevada, 2012, Nevada Division of Environmental Protection Bureau of Corrective Actions

    Data.gov (United States)

    U.S. Environmental Protection Agency — The BCA layers are derived from a database for Federally Regulated Underground Storage Tanks (UST) and a database for Remediation and Leaking Underground Storage...

  4. Lower Colorado River GRP Underground Storage Tank Sites (Open), Nevada, 2012, Nevada Division of Environmental Protection Bureau of Corrective Actions

    Data.gov (United States)

    U.S. Environmental Protection Agency — The BCA layers are derived from a database for Federally Regulated Underground Storage Tanks (UST) and a database for Remediation and Leaking Underground Storage...

  5. Review of Tank Lay-Up Status at US Department of Energy Radioactive Waste Tank Sites

    International Nuclear Information System (INIS)

    Elmore, Monte R.; Henderson, Colin

    2002-01-01

    During fiscal year (FY) 2001 as part of a Tanks Focus Area strategic initiative, tank lay-up options were developed and evaluated for the two high-level waste (HLW) storage tanks at the West Valley Demonstration Project. As follow-on task, a list of key waste tank contacts throughout the US Department of Energy complex was developed. Visits were then made to the primary DOE sites with radioactive waste storage tanks to discuss the concept and applicability of tank lay-up. This report documents the results of individual discussions with tank closure staff at the four DOE Sites concerning tank closure status and plans as well as lay-up options and activities

  6. Safety issue resolution strategy plan for inactive miscellaneous underground storage tanks

    International Nuclear Information System (INIS)

    Wang, O.S.; Powers, T.B.

    1994-09-01

    The purpose of this strategy plan is to identify, confirm, and resolve safely issues associated with inactive miscellaneous underground storage tanks (MUSTs) using a risk-based priority approach. Assumptions and processes to assess potential risks and operational concerns are documented in this report. Safety issue priorities are ranked based on a number of considerations including risk ranking and cost effectiveness. This plan specifies work scope and recommends schedules for activities related to resolving safety issues, such as collecting historical data, searching for authorization documents, performing Unreviewed Safety Question (USQ) screening and evaluation, identifying safety issues, imposing operational controls and monitoring, characterizing waste contents, mitigating and resolving safety issues, and fulfilling other remediation requirements consistent with the overall Tank Waste Remediation System strategy. Recommendations for characterization and remediation are also recommended according to the order of importance and practical programmatic consideration

  7. Going global: LNG could open up gas market

    International Nuclear Information System (INIS)

    Jaremko, D.

    2004-01-01

    The probability of liquefied natural gas becoming a major source of energy in North America is discussed. Although the safety of the technology of transporting LNG was proven more than 40 years ago, there are considerable hurdles to be overcome when it comes to establishing LNG terminals. Industry insiders contend that the obstacles to finding suitable sites are primarily NIMBY (not-in-my-backyard) or BANANA (build-absolutely-nothing-anywhere-near-anyone) issues that will be overcome in time with better public information as to what the real hazards are, but the time is not yet ripe for any serious LNG development. Proposed LNG projects in Malaysia, Nigeria, Angola are reviewed, in addition to four projects in the United States, one in the Gulf of Mexico, and three along the American east coast. A Canadian project at Bear Head near Point Tupper, Nova Scotia, which has support from the business community, government and industry, and would provide the shortest distance to eastern North American markets for Atlantic basin shippers is also reviewed. LNG technological and transportation issues apart, there is also direct competition from the long-proposed Alaska pipeline which, if and when built, will provide long-term steady supply of gas for the U. S. market. Alaskan natural gas is clearly the preferred alternative to LNG at the present time

  8. Distribution of gas from Canaport LNG

    International Nuclear Information System (INIS)

    Thompson, W.

    2006-01-01

    Construction of the Canaport Liquefied Natural Gas (LNG) project will begin in 2006. Public consultations are currently being held for the 145 km pipeline from Canaport to Bailleyville, Maine. It is expected that both the facility and the pipeline will be operational by 2008. This presentation provided details of the New Brunswick (NB) Department of Energy's (DOE) regulatory oversight of the Canaport Liquefied Natural Gas (LNG) project. The DOE is responsible for ensuring diversity and security of supply; economic efficiency; economic development opportunities and protection of the environment. The Canaport LNG facility will provide an additional 500 to 600 temporary jobs over a 2 to 3 year period, as well as 20 full-time jobs once the plant is operational. Tax revenues, access roads and the construction of a pipeline to Bailleyville, Maine will also have positive impacts on the NB economy. The facility will provide a secure long term supply of natural gas for the region. In order to support its energy goals, the DOE has proposed amendments to provide for the distribution of gas from the plant to NB customers. A proposed LNG franchise to allow for direct distribution of gas from the LNG plant to customers was discussed. Issues concerning the Gas Distribution Act and the New Pipeline Act of 2006 were also examined. It was concluded that public consultations are currently being held for the 145 km pipeline, and that both the facility and the pipeline are expected to be operational by 2008. refs., tabs., figs

  9. Distribution of gas from Canaport LNG

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, W. [New Brunswick Dept. of Energy, Fredericton, NB (Canada)

    2006-07-01

    Construction of the Canaport Liquefied Natural Gas (LNG) project will begin in 2006. Public consultations are currently being held for the 145 km pipeline from Canaport to Bailleyville, Maine. It is expected that both the facility and the pipeline will be operational by 2008. This presentation provided details of the New Brunswick (NB) Department of Energy's (DOE) regulatory oversight of the Canaport Liquefied Natural Gas (LNG) project. The DOE is responsible for ensuring diversity and security of supply; economic efficiency; economic development opportunities and protection of the environment. The Canaport LNG facility will provide an additional 500 to 600 temporary jobs over a 2 to 3 year period, as well as 20 full-time jobs once the plant is operational. Tax revenues, access roads and the construction of a pipeline to Bailleyville, Maine will also have positive impacts on the NB economy. The facility will provide a secure long term supply of natural gas for the region. In order to support its energy goals, the DOE has proposed amendments to provide for the distribution of gas from the plant to NB customers. A proposed LNG franchise to allow for direct distribution of gas from the LNG plant to customers was discussed. Issues concerning the Gas Distribution Act and the New Pipeline Act of 2006 were also examined. It was concluded that public consultations are currently being held for the 145 km pipeline, and that both the facility and the pipeline are expected to be operational by 2008. refs., tabs., figs.

  10. Performance of electric forklift with low-temperature polymer exchange membrane fuel cell power module and metal hydride hydrogen storage extension tank

    Science.gov (United States)

    Lototskyy, Mykhaylo V.; Tolj, Ivan; Parsons, Adrian; Smith, Fahmida; Sita, Cordellia; Linkov, Vladimir

    2016-06-01

    We present test results of a commercial 3-tonne electric forklift (STILL) equipped with a commercial fuel cell power module (Plug Power) and a MH hydrogen storage tank (HySA Systems and TF Design). The tests included: (i) performance evaluation of "hybrid" hydrogen storage system during refuelling at low (fuel cell power module (alone) - power module with integrated MH tank; and (iii) performance tests of the forklift during its operation under working conditions. It was found that (a) the forklift with power module and MH tank can achieve 83% of maximum hydrogen storage capacity during 6 min refuelling (for full capacity 12-15 min); (b) heavy-duty operation of the forklift is characterised by 25% increase in energy consumption, and during system operation more uniform power distribution occurs when operating in the fuel cell powering mode with MH, in comparison to the battery powering mode; (c) use of the fully refuelled fuel cell power module with the MH extension tank allows for uninterrupted operation for 3 h 6 min and 7 h 15 min, for heavy- and light-duty operation, respectively.

  11. Gas storage facilities. Investigation of their social value. Supplement

    International Nuclear Information System (INIS)

    1997-02-01

    The socio-economic factors resulting from location of gas storage facilities are evaluated. Various alternatives to the existing projects are estimated, for instance 11 new pipelines, in some cases combined with new production capacity, LNG facilities, differentiated tariffs, reconstruction of decentralized heat/power plants etc. Theoretical considerations and models, among others involving gas storage abroad, are presented. Seasonal storage, emergency storage, storage controlled by economic optimization (profitable purchases, sales at highest market) are described for various types of facilities, like aquifers, caverns and LNG-stores. Natural gas supplies in Europe, infrastructure and resources are compared to the Danish conditions. Sensitivity of the Danish heating market for natural gas consumption is investigated. Reduction in energy use for space heating by 2005 will change the needs of storage of 740 Mm 3 gas to 650 Mm 3 . Extra consumption by the decentralized power/heat plants is not accounted for in this estimation. Dynamic models of the future gas consumption are based on the EU 'European Energy 2020'. (EG)

  12. First LNG deliveries from Qatar to Japan

    International Nuclear Information System (INIS)

    Legros, E.J.

    1997-01-01

    Twenty five years after the discovery of the giant North Field natural gas deposit, the Qatargas company has delivered its first LNG freight to Japan in December 1996. This paper recalls the history of the company from the discovery of the offshore North Field, its valorization and development, the LNG project with the building of the Ras Laffan harbour and its condensates processing factory and the 3 offshore production platforms. Ten methane-tanker ships will be in operation in the year 2000. Qatar's LNG exports should reach 20 to 25 Mt/year in the next ten years, when all its liquefaction factory projects will be completed. (J.S.)

  13. Indian Country Leaking Underground Storage Tanks (LUST) Map Service, Region 9, 2016, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — This map service displays Leaking Underground Storage Tanks in US EPA Region 9 Indian Country. The service is composed of three layers; one for each unique LUST...

  14. High-level waste storage tank farms/242-A evaporator Standards/Requirements Identification Document (S/RID)

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    The High-Level Waste Storage Tank Farms/242-A Evaporator Standards/Requirements Identification Document (S/RID) is contained in multiple volumes. This document (Volume 3) presents the standards and requirements for the following sections: Safeguards and Security, Engineering Design, and Maintenance.

  15. High-level waste storage tank farms/242-A evaporator Standards/Requirements Identification Document (S/RID)

    International Nuclear Information System (INIS)

    1994-04-01

    The High-Level Waste Storage Tank Farms/242-A Evaporator Standards/Requirements Identification Document (S/RID) is contained in multiple volumes. This document (Volume 3) presents the standards and requirements for the following sections: Safeguards and Security, Engineering Design, and Maintenance

  16. Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order

    International Nuclear Information System (INIS)

    Evans, S.K.

    2002-01-01

    This Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about sampling design, required analyses, and sample collection and handling procedures, is to be used in conjunction with the Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System

  17. Radiological assessment of worker doses during sludge mobilization and removal at the Melton Valley storage tanks

    International Nuclear Information System (INIS)

    Kerr, G.D.; Coleman, R.L.; Kocher, D.C.; Wynn, C.C.

    1996-01-01

    This report presents an assessment of potential radiation doses to workers during mobilization and removal of contaminated sludges from the Melton Valley Storage Tanks at Oak Ridge National Laboratory. The assessment is based on (1) measurements of radionuclide concentrations in sludge and supernatant liquid samples from the waste storage tanks, (2) measurements of gamma radiation levels in various areas that will be accessed by workers during normal activities, (3) calculations of gamma radiation levels for particular exposure situations, especially when the available measurements are not applicable, and (4) assumed scenarios for worker activities in radiation areas. Only doses from external exposure are estimated in this assessment. Doses from internal exposure are assumed to be controlled by containment of radioactive materials or respiratory protection of workers and are not estimated

  18. Corrective Action Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Cox, D. H.

    2000-01-01

    The Area 25 Underground Storage Tanks site Corrective Action Unit (CAU) 135 will be closed by unrestricted release decontamination and verification survey, in accordance with the Federal Facility Agreement and Consert Order (FFACO, 1996). The CAU includes one Corrective Action Site (CAS). The Area 25 Underground Storage Tanks, (CAS 25-02-01), referred to as the Engine-Maintenance Assembly and Disassembly (E-MAD) Waste Holdup Tanks and Vault, were used to receive liquid waste from all of the radioactive drains at the E-MAD Facility. Based on the results of the Corrective Action Investigation conducted in June 1999 discussed in the Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada (DOE/NV,1999a), one sample from the radiological survey of the concrete vault interior exceeded radionuclide preliminary action levels. The analytes from the sediment samples that exceeded the preliminary action levels are polychlorinated biphenyls, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons as diesel-range organics, and radionuclides. Unrestricted release decontamination and verification involves removal of concrete and the cement-lined pump sump from the vault. After verification that the contamination has been removed, the vault will be repaired with concrete, as necessary. The radiological- and chemical-contaminated pump sump and concrete removed from the vault would be disposed of at the Area 5 Radioactive Waste Management Site. The vault interior will be field surveyed following removal of contaminated material to verify that unrestricted release criteria have been achieved

  19. Corrective Action Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    D. H. Cox

    2000-07-01

    The Area 25 Underground Storage Tanks site Corrective Action Unit (CAU) 135 will be closed by unrestricted release decontamination and verification survey, in accordance with the Federal Facility Agreement and Consert Order (FFACO, 1996). The CAU includes one Corrective Action Site (CAS). The Area 25 Underground Storage Tanks, (CAS 25-02-01), referred to as the Engine-Maintenance Assembly and Disassembly (E-MAD) Waste Holdup Tanks and Vault, were used to receive liquid waste from all of the radioactive drains at the E-MAD Facility. Based on the results of the Corrective Action Investigation conducted in June 1999 discussed in the Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada (DOE/NV,1999a), one sample from the radiological survey of the concrete vault interior exceeded radionuclide preliminary action levels. The analytes from the sediment samples that exceeded the preliminary action levels are polychlorinated biphenyls, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons as diesel-range organics, and radionuclides. Unrestricted release decontamination and verification involves removal of concrete and the cement-lined pump sump from the vault. After verification that the contamination has been removed, the vault will be repaired with concrete, as necessary. The radiological- and chemical-contaminated pump sump and concrete removed from the vault would be disposed of at the Area 5 Radioactive Waste Management Site. The vault interior will be field surveyed following removal of contaminated material to verify that unrestricted release criteria have been achieved.

  20. The Phoenix series large scale LNG pool fire experiments.

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Richard B.; Jensen, Richard Pearson; Demosthenous, Byron; Luketa, Anay Josephine; Ricks, Allen Joseph; Hightower, Marion Michael; Blanchat, Thomas K.; Helmick, Paul H.; Tieszen, Sheldon Robert; Deola, Regina Anne; Mercier, Jeffrey Alan; Suo-Anttila, Jill Marie; Miller, Timothy J.

    2010-12-01

    The increasing demand for natural gas could increase the number and frequency of Liquefied Natural Gas (LNG) tanker deliveries to ports across the United States. Because of the increasing number of shipments and the number of possible new facilities, concerns about the potential safety of the public and property from an accidental, and even more importantly intentional spills, have increased. While improvements have been made over the past decade in assessing hazards from LNG spills, the existing experimental data is much smaller in size and scale than many postulated large accidental and intentional spills. Since the physics and hazards from a fire change with fire size, there are concerns about the adequacy of current hazard prediction techniques for large LNG spills and fires. To address these concerns, Congress funded the Department of Energy (DOE) in 2008 to conduct a series of laboratory and large-scale LNG pool fire experiments at Sandia National Laboratories (Sandia) in Albuquerque, New Mexico. This report presents the test data and results of both sets of fire experiments. A series of five reduced-scale (gas burner) tests (yielding 27 sets of data) were conducted in 2007 and 2008 at Sandia's Thermal Test Complex (TTC) to assess flame height to fire diameter ratios as a function of nondimensional heat release rates for extrapolation to large-scale LNG fires. The large-scale LNG pool fire experiments were conducted in a 120 m diameter pond specially designed and constructed in Sandia's Area III large-scale test complex. Two fire tests of LNG spills of 21 and 81 m in diameter were conducted in 2009 to improve the understanding of flame height, smoke production, and burn rate and therefore the physics and hazards of large LNG spills and fires.

  1. Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order; TOPICAL

    International Nuclear Information System (INIS)

    Evans, S.K.

    2002-01-01

    This Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA- 731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about the project description, project organization, and quality assurance and quality control procedures, is to be used in conjunction with the Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System. This Quality Assurance Project Plan specifies the procedures for obtaining the data of known quality required by the closure activities for the TRA-731 caustic and acid storage tank system

  2. Lightweight concrete materials and structural systems for water tanks for thermal storage. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Buckman, R.W. Jr.; Elia, G.G.; Ichikawa, Y.

    1980-12-01

    Thermally efficient hot water storage tanks were designed, fabricated and evaluated. The tanks were made using cellular concrete at a nominal density of 100 lb/ft/sup 3/ for the structural elements and at a 30 lb/ft/sup 3/ density for the insulating elements. Thermal performance testing of the tanks was done using a static decay test since the test procedure specified in ASHRAE 94-77 was not experimentally practical. A series of composition modifications to the cellular concrete mix were investigated and the addition of alkaline resistant glass fibers was found to enhance the mechanical properties at no sacrifice in thermal behavior. Economic analysis indicated that cellular concrete provides a cost-effective insulating material. The total portability of the plant for producing cellular concrete makes cellular concrete amenable to on-site fabrication and uniquely adaptable to retrofit applications.

  3. The Pacific Basin LNG trade: a return to fundamentals

    International Nuclear Information System (INIS)

    Baharuddin, H.

    1991-01-01

    The LNG business in the Pacific Region is unique because there is no other source of energy in which seller and buyer sign contracts for 20-year periods. This long-term relationship is based on mutual buyer/seller cooperation, and mutual buyer/seller recognition of the financial and commercial challenges faced by all links in the LNG Supply Chain. However, there are now concerns that those involved in the LNG business were ignoring the fundamentals of the trade. The buyer expected the seller to absorb higher transportation costs, easing take or pay terms, more flexibility, evergreen options on uncommitted capacity, etc. On the other side, sellers expected larger baseload quantities, equitable sharing of LNG chain risks with consumers. (author)

  4. Development of a computer code to predict a ventilation requirement for an underground radioactive waste storage tank

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Y.J.; Dalpiaz, E.L. [ICF Kaiser Hanford Co., Richland, WA (United States)

    1997-08-01

    Computer code, WTVFE (Waste Tank Ventilation Flow Evaluation), has been developed to evaluate the ventilation requirement for an underground storage tank for radioactive waste. Heat generated by the radioactive waste and mixing pumps in the tank is removed mainly through the ventilation system. The heat removal process by the ventilation system includes the evaporation of water from the waste and the heat transfer by natural convection from the waste surface. Also, a portion of the heat will be removed through the soil and the air circulating through the gap between the primary and secondary tanks. The heat loss caused by evaporation is modeled based on recent evaporation test results by the Westinghouse Hanford Company using a simulated small scale waste tank. Other heat transfer phenomena are evaluated based on well established conduction and convection heat transfer relationships. 10 refs., 3 tabs.

  5. High water level installation of monitoring wells for underground storage tanks

    International Nuclear Information System (INIS)

    Treadway, C.

    1990-01-01

    This paper briefly describes a common monitoring well installation design for shallow ground water contamination resulting from leaky underground storage tanks. The paper describes drilling techniques used in unconsolidated Florida aquifers using hollow-stem augers. It describes methods for the prevention of heaving sands and sand-locking problems. It then goes on to describe the proper well casing placement and sealing techniques using neat cements. The proper sell screen level is also discussed to maximize the detection of floating hydrocarbons

  6. Lower Colorado River GRP Leaking Underground Storage Tank Sites (Closed), Nevada, 2012, Nevada Division of Environmental Protection Bureau of Corrective Actions

    Data.gov (United States)

    U.S. Environmental Protection Agency — The BCA layers are derived from a database for Federally Regulated Underground Storage Tanks (UST) and a database for Remediation and Leaking Underground Storage...

  7. Lower Colorado River GRP Leaking Underground Storage Tank Sites (Open), Nevada, 2012, Nevada Division of Environmental Protection Bureau of Corrective Actions

    Data.gov (United States)

    U.S. Environmental Protection Agency — The BCA layers are derived from a database for Federally Regulated Underground Storage Tanks (UST) and a database for Remediation and Leaking Underground Storage...

  8. The Asia Pacific LNG trade: Status and technology development

    International Nuclear Information System (INIS)

    Hovdestad, W.R.

    1995-01-01

    The Asia Pacific Region is experiencing a period of sustained economic expansion. Economic growth has led to an increasing demand for energy that has spurred a rapid expansion of baseload liquefied natural gas (LNG) facilities in this region. This is illustrated by the fact that seven of the ten baseload facilities in existence provide LNG for markets in the Asia Pacific region. With the three exceptions having been initially commissioned in 1972 and earlier, it is fair to observed that most advances in LNG technology have been developed and applied for this market. The paper presents the current status and identified future trends for the Asia Pacific LNG trade. Technology development in terms of application to onstream production, processing and transportation facilities, including LNG tankers, is presented. The potential of future advances to applied technology and operational practices to improve the cost-effectiveness of new and existing facilities is discussed. Current design data and methods as actually used are examined in terms of identifying where fundamental research and basic physical data are insufficient for optimization purposes. These findings are then summarized and presented in terms of the likely evolution of future and existing LNG projects in the Asia Pacific region

  9. Study of Vapour Cloud Explosion Impact from Pressure Changes in the Liquefied Petroleum Gas Sphere Tank Storage Leakage

    Science.gov (United States)

    Rashid, Z. A.; Suhaimi Yeong, A. F. Mohd; Alias, A. B.; Ahmad, M. A.; AbdulBari Ali, S.

    2018-05-01

    This research was carried out to determine the risk impact of Liquefied Petroleum Gas (LPG) storage facilities, especially in the event of LPG tank explosion. In order to prevent the LPG tank explosion from occurring, it is important to decide the most suitable operating condition for the LPG tank itself, as the explosion of LPG tank could affect and cause extensive damage to the surrounding. The explosion of LPG tank usually occurs due to the rise of pressure in the tank. Thus, in this research, a method called Planas-Cuchi was applied to determine the Peak Side-On Overpressure (Po) of the LPG tank during the occurrence of explosion. Thermodynamic properties of saturated propane, (C3H8) have been chosen as a reference and basis of calculation to determine the parameters such as Explosion Energy (E), Equivalent Mass of TNT (WTNT), and Scaled Overpressure (PS ). A cylindrical LPG tank in Feyzin Refinery, France was selected as a case study in this research and at the end of this research, the most suitable operating pressure of the LPG tank was determined.

  10. Which way for Europe's gas storage market?

    International Nuclear Information System (INIS)

    Hureau, Geoffroy; Cornot-Gandolphe, Sylvie

    2013-06-01

    This slide show presents in a first part the 2013 Situation of the European gas storage market (Capacity, Gas Demand vs. Gas Storage, Spreads and Volatility, LNG effect, Storage Price, Utilization of Storage Facilities, Security of supply). The future of European Gas Demand and Supply are presented in a second part (Demand and Supply Factors, Market Liberalization, Estimates of European UGS Needs by 2030, Planned Working Gas Capacities in Europe)

  11. Novel design of LNG (liquefied natural gas) reliquefaction process

    Energy Technology Data Exchange (ETDEWEB)

    Baek, S., E-mail: s.baek@kaist.ac.kr [Cryogenic Engineering Laboratory, Department of Mechanical Engineering, Korea Advanced Institute of Science and Technology, 373-1, Guseong-dong, Yuseong-gu, Daejeon 305-701 (Korea, Republic of); Hwang, G.; Lee, C. [Cryogenic Engineering Laboratory, Department of Mechanical Engineering, Korea Advanced Institute of Science and Technology, 373-1, Guseong-dong, Yuseong-gu, Daejeon 305-701 (Korea, Republic of); Jeong, S., E-mail: skjeong@kaist.ac.kr [Cryogenic Engineering Laboratory, Department of Mechanical Engineering, Korea Advanced Institute of Science and Technology, 373-1, Guseong-dong, Yuseong-gu, Daejeon 305-701 (Korea, Republic of); Choi, D. [Cryogenic Engineering Laboratory, Department of Mechanical Engineering, Korea Advanced Institute of Science and Technology, 373-1, Guseong-dong, Yuseong-gu, Daejeon 305-701 (Korea, Republic of); Ship/Plant System R and D Team, Daewoo Shipbuilding and Marine Engineering Co., Ltd., 1, Ajoo, Koje, Kyungnam 656-714 (Korea, Republic of)

    2011-08-15

    Highlights: {yields} We performed experiments with LN2 to mock up the new LNG reliquefaction process. {yields} Subcooled liquid goes to heat exchanger, heater, and phase separator. {yields} Reliquefaction occurs when vapor enters heat exchanger and verified by experiments. {yields} Reliquefaction ratio increases when subcooling degree or system pressure increases. - Abstract: This paper presents an investigation of novel LNG reliquefaction process where the cold exergy of subcooled LNG is utilized to recondense the vaporized light component of LNG after it is separated from the heavier component in a phase separator. The regeneration of cold exergy is especially effective as well as important in thermodynamic sense when a cryogenic process is involved. To verify the proposed idea, we performed an experimental study by facilitating liquid nitrogen apparatus to mock up the LNG reliquefaction process. Subcooled liquid nitrogen is produced for a commercial transportation container with a house-made atmospheric liquid nitrogen heat exchanger and then, having subooled degree of up to 19 K, it simulates the behavior of subcooled LNG in the lab-scale reliquefaction experiment. Recondensation of the vaporized gas is possible by using the cold exergy of subcooled liquid in a properly fabricated heat exchanger. Effect of heat exchanger performance factor and degree of subcooling on recondensation portion has been discussed in this paper. It is concluded that utilizing pressurized subcooled liquid that is obtained by liquid pump can surely reduce the pumping power of the vaporized natural gas and save the overall energy expenditure in LNG reliquefaction process.

  12. Novel design of LNG (liquefied natural gas) reliquefaction process

    International Nuclear Information System (INIS)

    Baek, S.; Hwang, G.; Lee, C.; Jeong, S.; Choi, D.

    2011-01-01

    Highlights: → We performed experiments with LN2 to mock up the new LNG reliquefaction process. → Subcooled liquid goes to heat exchanger, heater, and phase separator. → Reliquefaction occurs when vapor enters heat exchanger and verified by experiments. → Reliquefaction ratio increases when subcooling degree or system pressure increases. - Abstract: This paper presents an investigation of novel LNG reliquefaction process where the cold exergy of subcooled LNG is utilized to recondense the vaporized light component of LNG after it is separated from the heavier component in a phase separator. The regeneration of cold exergy is especially effective as well as important in thermodynamic sense when a cryogenic process is involved. To verify the proposed idea, we performed an experimental study by facilitating liquid nitrogen apparatus to mock up the LNG reliquefaction process. Subcooled liquid nitrogen is produced for a commercial transportation container with a house-made atmospheric liquid nitrogen heat exchanger and then, having subooled degree of up to 19 K, it simulates the behavior of subcooled LNG in the lab-scale reliquefaction experiment. Recondensation of the vaporized gas is possible by using the cold exergy of subcooled liquid in a properly fabricated heat exchanger. Effect of heat exchanger performance factor and degree of subcooling on recondensation portion has been discussed in this paper. It is concluded that utilizing pressurized subcooled liquid that is obtained by liquid pump can surely reduce the pumping power of the vaporized natural gas and save the overall energy expenditure in LNG reliquefaction process.

  13. High-level waste storage tank farms/242-A evaporator standards/requirements identification document (S/RID), Vol. 4

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    Radiation protection of personnel and the public is accomplished by establishing a well defined Radiation Protection Organization to ensure that appropriate controls on radioactive materials and radiation sources are implemented and documented. This Requirements Identification Document (RID) applies to the activities, personnel, structures, systems, components, and programs involved in executing the mission of the Tank Farms. The physical boundaries within which the requirements of this RID apply are the Single Shell Tank Farms, Double Shell Tank Farms, 242-A Evaporator-Crystallizer, 242-S, T Evaporators, Liquid Effluent Retention Facility (LERF), Purgewater Storage Facility (PWSF), and all interconnecting piping, valves, instrumentation, and controls. Also included is all piping, valves, instrumentation, and controls up to and including the most remote valve under Tank Farms control at any other Hanford Facility having an interconnection with Tank Farms. The boundary of the structures, systems, components, and programs to which this RID applies, is defined by those that are dedicated to and/or under the control of the Tank Farms Operations Department and are specifically implemented at the Tank Farms.

  14. High-level waste storage tank farms/242-A evaporator standards/requirements identification document (S/RID), Vol. 4

    International Nuclear Information System (INIS)

    1994-04-01

    Radiation protection of personnel and the public is accomplished by establishing a well defined Radiation Protection Organization to ensure that appropriate controls on radioactive materials and radiation sources are implemented and documented. This Requirements Identification Document (RID) applies to the activities, personnel, structures, systems, components, and programs involved in executing the mission of the Tank Farms. The physical boundaries within which the requirements of this RID apply are the Single Shell Tank Farms, Double Shell Tank Farms, 242-A Evaporator-Crystallizer, 242-S, T Evaporators, Liquid Effluent Retention Facility (LERF), Purgewater Storage Facility (PWSF), and all interconnecting piping, valves, instrumentation, and controls. Also included is all piping, valves, instrumentation, and controls up to and including the most remote valve under Tank Farms control at any other Hanford Facility having an interconnection with Tank Farms. The boundary of the structures, systems, components, and programs to which this RID applies, is defined by those that are dedicated to and/or under the control of the Tank Farms Operations Department and are specifically implemented at the Tank Farms

  15. Implementation of seismic design and evaluation guidelines for the Department of Energy high-level waste storage tanks and appurtenances

    International Nuclear Information System (INIS)

    Conrads, T.J.

    1993-06-01

    In the fall of 1992, a draft of the Seismic Design and Evaluation Guidelines for the Department of Energy (DOE) High-level Waste Storage Tanks and Appurtenances was issued. The guidelines were prepared by the Tanks Seismic Experts Panel (TSEP) and this task was sponsored by DOE, Environmental Management. The TSEP is comprised of a number of consultants known for their knowledge of seismic ground motion and expertise in the analysis of structures, systems and components subjected to seismic loads. The development of these guidelines was managed by staff from Brookhaven National Laboratory, Engineering Research and Applications Division, Department of Nuclear Energy. This paper describes the process used to incorporate the Seismic Design and Evaluation Guidelines for the DOE High-Level Waste Storage Tanks and Appurtenances into the design criteria for the Multi-Function Waste Tank Project at the Hanford Site. This project will design and construct six new high-level waste tanks in the 200 Areas at the Hanford Site. This paper also discusses the vehicles used to ensure compliance to these guidelines throughout Title 1 and Title 2 design phases of the project as well as the strategy used to ensure consistent and cost-effective application of the guidelines by the structural analysts. The paper includes lessons learned and provides recommendations for other tank design projects which might employ the TSEP guidelines

  16. Implementation of seismic design and evaluation guidelines for the Department of Energy high-level waste storage tanks and appurtenances

    International Nuclear Information System (INIS)

    Conrads, T.J.

    1993-01-01

    In the fall of 1992, a draft of the Seismic Design and Evaluation Guidelines for the U.S. Department of Energy (DOE) High-level Waste Storage Tanks and Appurtenances was issued. The guidelines were prepared by the Tanks Seismic Experts Panel (TSEP) and this task was sponsored by DOE, Environmental Management. The TSEP comprises a number of consultants known for their understanding of seismic ground motion and expertise in the analysis of structures, systems and components subjected to seismic loads. The development of these guidelines was managed by staff from Brookhaven National Laboratory, Engineering Research and Applications Division, Department of Nuclear Energy. This paper describes the process used to incorporate the Seismic Design and Evaluation guidelines for the DOE High-Level Waste Storage Tanks and Appurtenances into the design criteria for the Multi-Function Waste Tank Project at the Hanford Site. This project will design and construct six new high-level waste tanks in the 200 Areas at the Hanford Site. This paper also discusses the vehicles used to ensure compliance to these guidelines throughout Title 1 and Title 2 design phases of the project as well as the strategy used to ensure consistent and cost-effective application of the guidelines by the structural analysts. The paper includes lessons learned and provides recommendations for other tank design projects that might employ the TSEP guidelines

  17. Resource Conservation and Recovery Act Closure Plan for the Y-12 9409-5 Tank Storage Facility

    International Nuclear Information System (INIS)

    1995-02-01

    This document presents information on the closure of the Y-12 9409-5 Tank Storage Facility. Topics discussed include: facility description; closure history; closure performance standard; partial closure; maximum waste inventory; closure activities; schedule; and postclosure care

  18. Improving of Mixing by Submerged Rotary Jet (SRJ) System in a Large Industrial Storage Tank by CFD Techniques

    Science.gov (United States)

    Barekatain, H.; Hashemabadi, S. H.

    2011-09-01

    This paper reports the result of a CFD (Computational Fluid Dynamics) study on the Submerged Rotary Jet (SRJ) mixing system in a large industrial crude oil storage tank (one million barrels). This system has been installed on the tank just for reduction of sludge, but improper installation causes more accumulation of sludge on one side of tank. The main question is: How can we improve the mixing operation in this tank? For the purpose, a three dimensional modeling is carried out using an in-house CFD code and RNG k-ɛ model for turbulence prediction. The results show that pump suction location and crude oil velocity in tank are most effective factors on the sludge amount. Then, different ways such as increasing of jet flow rate, increasing and decreasing of tank height and reducing of nozzle diameter have been investigated. Finally, in this case, the results show the sedimentation of sludge in whole tank can be removed by 20% increasing of jet flow rate.

  19. The importance of LNG for natural gas consumption in the EU

    Directory of Open Access Journals (Sweden)

    Metelska Klaudia

    2016-01-01

    Full Text Available The World market of liquefied natural gas (LNG is growing rapidly. In 2015 LNG production exceeded 333 bcm with its predicted increase up to 450 bcm in 2019. The analysis of LNG role in natural gas import to the EU in recent years shows variability: LNG share in overall import reached 25% in 2011 and it went down to 15% in 2014. The smaller demand for natural gas including LNG in the EU can be due to, among others, a slower economic growth and a dynamic development of the use of renewable energy sources. The article shows the role of natural gas in the structure of consumption of primary energy as well as the changes in demand for natural gas in the years 2007–2014 for the main groups of end users: industry, energy production and individual households. The biggest fall in demand for natural gas has been observed in energy production sector in recent years. This publication continues to analyse the structure of natural gas supplies to the EU, with special emphasis on the directions of LNG import to the countries such as: The UK, Spain, France, Greece, Belgium, Portugal, Italy, Lithuania and The Netherlands. The significance of LNG in the balance of consumption of natural gas in these countries has been presented as well as the infrastructure connected with LNG and plans of development of regasification terminals. In the summary the most important conclusions have been drawn and a chance of the increase in significance of the role of LNG in the balance of natural gas supplies has been pointed out, which is due to the steep fall of LNG prices which has taken place in recent years.

  20. LNG trade preparations are a decade too soon

    Energy Technology Data Exchange (ETDEWEB)

    Timm, S [Mar. Week; Faridany, E; Mitchell, P

    1979-03-01

    A discussion of papers delivered at the 6th International LNG/LPG, Gastech 78, Conference (Monte Carlo 11/7-10/78) covers an estimate by E. Faridany (Ocean Phoenix Transp. Inc.) that in 1981-85, world trade in LNG would increase by 1775 million cu ft/day (Mcfd) over the current 2720 Mcfd, but of this increment only the 460 Mcfd Panhandle project using Lake Charles, La., as a regasification terminal will be into the U.S. while all other trade will be to Europe. Of the present LNG trade, 48Vertical Bar3< goes to Japan from the Brunei (535 Mcfd, the world's largest) and Abu Dhabi projects, and only 20Vertical Bar3< goes to the U.S. Faridany's estimates of U.S. LNG imports in 1990 vary from the 8215 Mcfd ''high'' to the ''median'' forecast of 2930 Mcfd; he predicted that the proportion of incremental sources of gas supply taken up by LNG in 1990 is only 20-40Vertical Bar3< for the U.S., compared with 25Vertical Bar3< for Europe and 90Vertical Bar3< for Japan. According to P. Mitchell (Poten and Partners), world demand for LPG could rise from 9 million to 38 million tons in 1979-85.

  1. Modeling Turkey’s future LNG supply security strategy

    International Nuclear Information System (INIS)

    Efe Biresselioglu, Mehmet; Hakan Demir, Muhittin; Kandemir, Cansu

    2012-01-01

    Turkey was among those countries which decided to increase its natural gas consumption in the 1990s, due to its relative low cost and lack of impact on the environment. However, a heavy dependence on imports, from Algeria, Qatar and Nigeria, respectively, creates a threat to energy security, both in terms of source and supply diversity. Accordingly, we follow an analytical approach to identify the accuracy of our assumption, considering the current economic, political and security risk. To this end, we formulate and solve a mixed integer programming model that determines the optimal sourcing strategy for Turkey’s increasing LNG demand. This model demonstrates a number of alternative policy options for LNG supply. Furthermore, we consider that increasing the proportion of LNG in the overall gas supply will contribute to the aim of improving Turkey’s level of energy security. - Highlights: ► Turkey’s best policy option is to increase the share of LNG. ► Turkey’s main suppliers of LNG will be Algeria, Egypt, Nigeria, and Trinidad and Tobago. ► Norway, Libya, and Oman contribute to the supply with rather smaller shares. ► With high risk scenario Algeria, Egypt, Nigeria and Libya will not be suppliers. ► Oman and Qatar will cover; even though they are high-cost suppliers.

  2. DOE underground storage tank waste remediation chemical processing hazards. Part I: Technology dictionary

    International Nuclear Information System (INIS)

    DeMuth, S.F.

    1996-10-01

    This document has been prepared to aid in the development of Regulating guidelines for the Privatization of Hanford underground storage tank waste remediation. The document has been prepared it two parts to facilitate their preparation. Part II is the primary focus of this effort in that it describes the technical basis for established and potential chemical processing hazards associated with Underground Storage Tank (UST) nuclear waste remediation across the DOE complex. The established hazards involve those at Sites for which Safety Analysis Reviews (SARs) have already been prepared. Potential hazards are those involving technologies currently being developed for future applications. Part I of this document outlines the scope of Part II by briefly describing the established and potential technologies. In addition to providing the scope, Part I can be used as a technical introduction and bibliography for Regulatory personnel new to the UST waste remediation, and in particular Privatization effort. Part II of this document is not intended to provide examples of a SAR Hazards Analysis, but rather provide an intelligence gathering source for Regulatory personnel who must eventually evaluate the Privatization SAR Hazards Analysis

  3. Towards a world development of LNG market

    International Nuclear Information System (INIS)

    Anon.

    2002-01-01

    The world development of the LNG trade was the theme of the second workshop of the 7. summit of natural gas industry leaders. With the increasing development of the LNG industry, a world scale natural gas market is becoming possible and should replace the present day regional markets. This article analyzes the expected economic impacts of such a market. (J.S.)

  4. Tank Closure Progress at the Department of Energy's Idaho National Engineering Laboratory Tank Farm Facility

    International Nuclear Information System (INIS)

    Butterworth, St.W.; Shaw, M.R.

    2009-01-01

    Significant progress continued at the U.S. Department of Energy (DOE) Idaho National Laboratory (INL) with the completion of the closure process to empty, clean and close radioactive liquid waste storage tanks at the Idaho Nuclear Technology and Engineering Center (INTEC) Tank Farm Facility (TFF). The TFF includes eleven 1,135.6-kL (300,000-gal) underground stainless steel storage tanks and four smaller, 113.5-kL (30,000-gal) stainless steel tanks, along with tank vaults, interconnecting piping, and ancillary equipment. The TFF tanks had historically been used to store a variety of radioactive liquid waste, including wastes associated with past spent nuclear fuel reprocessing. Four of the large storage tanks remain in use for waste storage while the other seven 1,135.6-kL (300,000-gal) tanks and the four 113.5-kL (30,000-gal) tanks have been emptied of waste, cleaned and filled with grout. Recent issuance of an Amended Record of Decision (ROD) in accordance with the National Environmental Policy Act, and a Waste Determination complying with Section 3116 of the Ronald W. Reagan National Defense Authorization Act (NDAA) for Fiscal Year 2005, allowed commencement of grouting activities on the cleaned tanks. The first three 113.5-kL (30,000-gal) tanks were grouted in the Fall of 2006 and the fourth tank and the seven 1,135.6-kL (300,000-gal) tanks were filled with grout in 2007 to provide long-term stability. During 2008 over seven miles of underground process piping along with associated tank valve boxes and secondary containment systems was stabilized with grout. Lessons learned were compiled and implemented during the closure process and will be utilized on the remaining four 1,135.6-kL (300,000-gal) underground stainless steel storage tanks. Significant progress has been made to clean and close emptied tanks at the INTEC TFF. Between 2002 and 2005, seven of the eleven 1,135.6-kL (300,000-gal) tanks and all four 113.5-kL (30,000-gal) tanks were cleaned and prepared

  5. Use of storage tank holdup measurements to reduce inventory differences in an ion exchange process

    International Nuclear Information System (INIS)

    Bonner, C.A.; Marshall, R.

    1986-01-01

    Inventory differences (ID) in an ion exchange process area have plagued the Los Alamos National Laboratory for years. The problem has always been attributed to plutonium precipitation in banks of horizontally oriented storage tanks; however, efforts to maintain the precipitates at low enough or even stable levels failed. Factoring tank holdup measurements into the end-of-month inventory balance would probably solve the ID problem; however, the authors were advised that gamma-based holdup measurements would yield very poor quality holdup estimates because of difficulties in determining transmission corrections and tank ''cross talk.'' When the ID problem became particularly troublesome in the spring of 1985, the authors evaluated two different gamma-based measurement techniques for estimating tank holdup. Not only did holdup estimates made by the two techniques agree, but plutonium recovered during intensive tank cleanout confirmed that the holdup measurements were of sufficient accuracy to be used for material balance adjustments. The measurement method chosen for routine use is somewhat unique since it is calibrated using tank cleanout data and requires no transmission corrections. The holdup measurements are made on a monthly basis and have dramatically reduced end-of-month inventory differences. This paper will present both a description of the measurement methodology and the inventory difference improvements

  6. Rheology of Savannah River site tank 42 and tank 51 HLW radioactive sludges

    International Nuclear Information System (INIS)

    Ha, B.C.; Bibler, N.E.

    1996-01-01

    Knowledge of the rheology of the radioactive sludge slurries at the Savannah River Site (SRS) is necessary in order to ensure that they can be retrieved from waste tanks and processed for final disposal. The high activity radioactive wastes stored as caustic slurries at SRS result from the neutralization of acid waste generated from production of nuclear defense materials. During storage, the wastes separate into a supernate layer and a sludge layer. In the Defense Waste Processing Facility (DWPF) at SRS, the radionuclides from the sludge and supernate will be immobilized into borosilicate glass for long term storage and eventual disposal. Before transferring the waste from a storage tank to the DWPF, a portion of the aluminum in the waste sludge will be dissolved and the sludge will be extensively washed to remove sodium. Tank 51 and Tank 42 radioactive sludges represent the first batch of HLW sludge to be processed in the DWPF. This paper presents results of rheology measurements of Tank 51 and Tank 42 at various solids concentrations. The rheologies of Tank 51 and Tank 42 radioactive slurries were measured remotely in the Shielded Cells Operations (SCO) at the Savannah River Technology Center (SRTC) using a modified Haake Rotovisco RV-12 with an M150 measuring drive unit and TI sensor system. Rheological properties of the Tank 51 and Tank 42 radioactive sludges were measured as a function of weight percent solids. The weight percent solids of Tank 42 sludge was 27, as received. Tank 51 sludge had already been washed. The weight percent solids were adjusted by dilution with water or by concentration through drying. At 12, 15, and 18 weight percent solids, the yield stresses of Tank 51 sludge were 5, 11, and 14 dynes/cm2, respectively. The apparent viscosities were 6, 10, and 12 centipoises at 300 sec-1 shear rate, respectively

  7. LNG, the way ahead

    International Nuclear Information System (INIS)

    Chabrelie, M.F.

    2007-01-01

    Despite the many obstacles producers must overcome, particularly to satisfy demand at the right time, LNG remains the pre-eminent option for ensuring the expansion of the world's gas industry. (author)

  8. Evaluation of Soil-Structure Interaction on the Seismic Response of Liquid Storage Tanks under Earthquake Ground Motions

    Directory of Open Access Journals (Sweden)

    Mostafa Farajian

    2017-03-01

    Full Text Available Soil-structure interaction (SSI could affect the seismic response of structures. Since liquid storage tanks are vital structures and must continue their operation under severe earthquakes, their seismic behavior should be studied. Accordingly, the seismic response of two types of steel liquid storage tanks (namely, broad and slender, with aspect ratios of height to radius equal to 0.6 and 1.85 founded on half-space soil is scrutinized under different earthquake ground motions. For a better comparison, the six considered ground motions are classified, based on their pulse-like characteristics, into two groups, named far and near fault ground motions. To model the liquid storage tanks, the simplified mass-spring model is used and the liquid is modeled as two lumped masses known as sloshing and impulsive, and the interaction of fluid and structure is considered using two coupled springs and dashpots. The SSI effect, also, is considered using a coupled spring and dashpot. Additionally, four types of soils are used to consider a wide variety of soil properties. To this end, after deriving the equations of motion, MATLAB programming is employed to obtain the time history responses. Results show that although the SSI effect leads to a decrease in the impulsive displacement, overturning moment, and normalized base shear, the sloshing (or convective displacement is not affected by such effects due to its long period.

  9. The safe removal of frozen air from the annulus of an LH2 storage tank

    Science.gov (United States)

    Krenn, A.; Starr, S.; Youngquist, R.; Nurge, M.; Sass, J.; Fesmire, J.; Cariker, C.; Bhattacharya, A.

    2015-12-01

    Large Liquid Hydrogen (LH2) storage tanks are vital infrastructure for NASA. Eventually, air may leak into the evacuated and perlite filled annular region of these tanks. Although the vacuum level is monitored in this region, the extremely cold temperature causes all but the helium and neon constituents of air to freeze. A small, often unnoticeable pressure rise is the result. As the leak persists, the quantity of frozen air increases, as does the thermal conductivity of the insulation system. Consequently, a notable increase in commodity boil-off is often the first indicator of an air leak. Severe damage can result from normal draining of the tank. The warming air will sublimate which will cause a pressure rise in the annulus. When the pressure increases above the triple point, the frozen air will begin to melt and migrate downward. Collection of liquid air on the carbon steel outer shell may chill it below its ductility range, resulting in fracture. In order to avoid a structural failure, as described above, a method for the safe removal of frozen air is needed. A thermal model of the storage tank has been created using SINDA/FLUINT modelling software. Experimental work is progressing in an attempt to characterize the thermal conductivity of a perlite/frozen nitrogen mixture. A statistical mechanics model is being developed in parallel for comparison to experimental work. The thermal model will be updated using the experimental/statistical mechanical data, and used to simulate potential removal scenarios. This paper will address methodologies and analysis techniques for evaluation of two proposed air removal methods.

  10. Stochastic modelling of the thermal characteristics of a hot-water storage tank on the basis of Markov chains; Zur stochastischen Modellierung des thermischen Verhaltens eines Warmwasserspeichers mittels Markov`scher Ketten

    Energy Technology Data Exchange (ETDEWEB)

    Werner, U.J. [Bauhaus-Universitaet Weimar (Germany). Fakultaet Bauingenieurwesen

    1998-09-01

    In an earlier contribution, a stochastic model was presented for a hot water storage tank supplied by a solar collector. The model was characterized in that the storage tank was assumed to be an ideal stratified storage tank, and its volume was subdivided into discrete identical storage compartments, so-called states, on the basis of the energy withdrawn from the tank. This simple model is now extended by assuming a stochastic variable for energy withdrawal and by taking account of energy loss at the surface of the hot water storage tank and inside it. [Deutsch] In einem frueheren Beitrag war fuer einen thermischen Speicher, der von einem Sonnenkollektor gespeist wird, ein stochastisches mathematisches Modell derart aufgestellt worden, dass ein als idealer Schichtenspeicher konzipierter Warmwasserspeicher bezueglich seines Volumens in diskrete, an der Energieentnahme orientierte, gleiche Speichereinheiten, sogenannte Zustaende, unterteilt wurde. Das einfache Modell wird nunmehr erweitert, indem die Entnahme als eine stochastische Groesse angenommen wird und die Energieverluste am und im Warmwasserspeicher Beruecksichtigung finden. (orig.)

  11. Melton Valley liquid low-level radioactive waste storage tanks evaluation

    International Nuclear Information System (INIS)

    1995-06-01

    The Melton Valley Liquid Low-Level Radioactive Waste Storage Tanks (MVSTs) store the evaporator concentrates from the Liquid Low-Level Radioactive Waste (LLLW) System at the Oak Ridge National Laboratory (ORNL). The eight stainless steel tanks contain approximately 375,000 gallons of liquid and sludge waste. These are some of the newer, better-designed tanks in the LLLW System. They have been evaluated and found by the US Environmental Protection Agency (EPA) and the Tennessee Department of Environment and Conservation to comply with all Federal Facility Agreement requirements for double containment. The operations and maintenance aspects of the tanks were also reviewed by the Defense Nuclear Facilities Safety Board (DNFSB) in September 1994. This document also contains an assessment of the risk to the public and ORNL workers from a leak in one of the MVSTs. Two primary scenarios were investigated: (1) exposure of the public to radiation from drinking Clinch River water contaminated by leaked LLLW, and (2) exposure of on-site workers to radiation by inhaling air contaminated by leaked LLLW. The estimated frequency of a leak from one of the MVSTs is about 8 x 10 -4 events per year, or about once in 1200 years (with a 95% confidence level). If a leak were to occur, the dose to a worker from inhalation would be about 2.3 x 10 -1 mrem (with a 95% confidence level). The dose to a member of the public through the drinking water pathway is estimated to be about 7 x 10 -1 mrem (with a 95% confidence level). By comparison with EPA Safe Drinking Water regulations, the allowable lifetime radiation dose is about 300 mrem. Thus, a postulated LLLW leak from the MVSTs would not add appreciably to an individual's lifetime radiation dose

  12. The Safety Design Research of a LNG Carrier Vehicle

    OpenAIRE

    Liang, Yi; Zhou, Xiang

    2015-01-01

    LNG is the abbreviation for liquefied natural gas, which is recognized as one of the world’s clean energies. LNG is one product at natural gas that through purification and ultra-low temperature is liquefied. The liquefied natural gas is very suitable for LNG transportation by a truck. China is a big country rich in natural resources. The use of natural gas is in favor of Chinese energy structure adjustment. It has important strategic significance to improve the ecological environment and the...

  13. Development of High Heat Input Welding High Strength Steel Plate for Oil Storage Tank in Xinyu Steel Company

    Science.gov (United States)

    Zhao, Hemin; Dong, Fujun; Liu, Xiaolin; Xiong, Xiong

    This essay introduces the developed high-heat input welding quenched and tempered pressure vessel steel 12MnNiVR for oil storage tank by Xinyu Steel, which passed the review by the Boiler and Pressure Vessel Standards Technical Committee in 2009. The review comments that compared to the domestic and foreign similar steel standard, the key technical index of enterprise standard were in advanced level. After the heat input of 100kJ/cm electro-gas welding, welded points were still with excellent low temperature toughness at -20°C. The steel plate may be constructed for oil storage tank, which has been permitted by thickness range from 10 to 40mm, and design temperature among -20°C-100°C. It studied microstructure genetic effects mechanical properties of the steel. Many production practices indicated that the mechanical properties of products and the steel by stress relief heat treatment of steel were excellent, with pretreatment of hot metal, converter refining, external refining, protective casting, TMCP and heat treatment process measurements. The stability of performance and matured technology of Xinyu Steel support the products could completely service the demand of steel constructed for 10-15 million cubic meters large oil storage tank.

  14. LNG: a commodity in the making

    International Nuclear Information System (INIS)

    Chabrelie, M.F.

    2006-01-01

    Although still far from being a commodity, LNG is undoubtedly emerging as an essential vector for world gas expansion. The flexibility it procures in terms of supply is of prime importance for future market equilibrium. Despite a number of uncertainties and constraints liable to thwart the realisation of the most optimistic growth prospects, the LNG trade remains wedded to rapid growth of about 7%/year by 2020, boosting its share of world gas trade to some 38% by that horizon. (author)

  15. LNG: a commodity in the making

    Energy Technology Data Exchange (ETDEWEB)

    Chabrelie, M.F

    2006-07-01

    Although still far from being a commodity, LNG is undoubtedly emerging as an essential vector for world gas expansion. The flexibility it procures in terms of supply is of prime importance for future market equilibrium. Despite a number of uncertainties and constraints liable to thwart the realisation of the most optimistic growth prospects, the LNG trade remains wedded to rapid growth of about 7%/year by 2020, boosting its share of world gas trade to some 38% by that horizon. (author)

  16. LNG: a commodity in the making

    International Nuclear Information System (INIS)

    Chabrelie, M.F.

    2006-01-01

    Although still far being a commodity, LNG is undoubtedly emerging as an essential vector for world gas expansion. The flexibility it procures in terms of supply is of prime importance for future market equilibrium. Despite a number of uncertainties and constraints liable to thwart the realization of the most optimistic growth prospects, the LNG trade remains wedded to rapid growth of about 7% year by 2020, boosting its share of world gas trade to some 38% by that horizon. (author)

  17. Removal of the liquid waste storage tank LV-2 in JRTF. Part 2. Removal works

    International Nuclear Information System (INIS)

    Kanayama, Fumihiko; Hagiya, Kazuaki; Sunaoshi, Mizuho; Muraguchi, Yoshinori; Satomi, Shinichi; Nemoto, Kouichi; Terunuma, Akihiro; Shiraishi, Kunio; Ito, Shinichi

    2011-06-01

    Dismantling activities of components in JAERI's Reprocessing Test Facility (JRTF) started from 1996 as a part of decommissioning of this facility. Removing out of a large liquid waste storage tank LV-2 as a whole tank from the annex building B without cutting in pieces to confirm safety and efficiency of this method started from 2006. After preparatory works, ceiling of LV-2 room was opened, and LV-2 was transferred. Useful data such as manpower, radiation control and waste amount through these works were collected, and work efficiency was analyzed by using of these data. (author)

  18. Tank characterization reference guide

    International Nuclear Information System (INIS)

    De Lorenzo, D.S.; DiCenso, A.T.; Hiller, D.B.; Johnson, K.W.; Rutherford, J.H.; Smith, D.J.; Simpson, B.C.

    1994-09-01

    Characterization of the Hanford Site high-level waste storage tanks supports safety issue resolution; operations and maintenance requirements; and retrieval, pretreatment, vitrification, and disposal technology development. Technical, historical, and programmatic information about the waste tanks is often scattered among many sources, if it is documented at all. This Tank Characterization Reference Guide, therefore, serves as a common location for much of the generic tank information that is otherwise contained in many documents. The report is intended to be an introduction to the issues and history surrounding the generation, storage, and management of the liquid process wastes, and a presentation of the sampling, analysis, and modeling activities that support the current waste characterization. This report should provide a basis upon which those unfamiliar with the Hanford Site tank farms can start their research

  19. Considerations of fluid-structure interaction effects in the design of high-level waste storage tanks

    International Nuclear Information System (INIS)

    Stuart, R.J.; Shipley, L.E.; Ghose, A.; Hiremath, M.S.

    1994-01-01

    For the seismic evaluation and design of the large number of underground high-level waste storage tanks (HLWST) at DOE sites, an important consideration is the adequate estimation of the fluid-structure interaction effects on the design forces. The DOE Tanks Seismic Experts Panel (TSEP) has developed seismic design and evaluation guidelines which include simplified methods for estimating hydrodynamic effects on tanks. For the practical analysis and design of HLWSTs, however, more sophisticated methods are often needed. The research presented in this paper demonstrates the effectiveness and reliability of finite element method based techniques, developed and utilized by ARES, to evaluate the fluid-structure interaction effects on underground HLWSTs. Analysis results for simple cylindrical tank configurations are first compared with previously published data, to benchmark the techniques. Next, for an actual HLWST configuration, correlations are established between these techniques and the TSEP guidelines, for the design parameters affected by fluid-structure interaction. Finally, practical design situations which may require a level of analysis sophistication that goes beyond the simplified TSEP guidelines are presented. This level of sophistication is frequently required when attempting to validate or upgrade the design qualifications of existing tanks

  20. Refloating stranded gas. Floating LNG-factory to become the largest ship on the world seas; Gestrand gas vlot trekken. Drijvende LNG-fabriek wordt grootste schip op wereldzeeen

    Energy Technology Data Exchange (ETDEWEB)

    De Wit, P.

    2010-09-15

    Great effort is currently put in the upcoming construction of a gigantic floating LNG plant that will be deployed by Shell. The enormous vessel will be used for the production of gas fields that are so far away from the coast that it is uneconomical to bring the gas to land by means of gas pipes, where it is converted into liquid natural gas (LNG). According to recent plans the first floating LNG plant will be used at the Prelude gas field northwest of Australia. [Dutch] Momenteel wordt hard gewerkt aan de aanstaande bouw van een gigantisch drijvende LNG-fabriek die door Shell ingezet gaat worden. Het enorme vaartuig wordt gebruikt voor de productie van gasvelden die zo ver uit de kust liggen dat het oneconomisch is om het gas met pijpleidingen aan land te brengen om het daar om te zetten in vloeibaar aardgas, LNG. Volgens de huidige plannen wordt de eerste drijvende LNG-fabriek gebruikt voor het Prelude gasveld ten noord-westen van Australie.