WorldWideScience

Sample records for licensing application organisation

  1. 14 CFR 431.73 - Continuing accuracy of license application; application for modification of license.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Continuing accuracy of license application; application for modification of license. 431.73 Section 431.73 Aeronautics and Space COMMERCIAL SPACE... Conditions § 431.73 Continuing accuracy of license application; application for modification of license. (a...

  2. IRIS pre-application licensing

    International Nuclear Information System (INIS)

    Carelli, Mario D.; Kling, Charles L.; Ritterbusch, Stanley E.

    2003-01-01

    This paper presents the approach to pre-application licensing by the International Reactor Innovative and Secure (IRIS), and advanced, integral reactor design with a thermal power of 1000 MW. The rationale for the pre-application licensing is discussed. Since IRIS technology is based on proven LWR experience, the project will rely on AP600/AP1000 precedent and will focus during the pre-application on long lead and novel items. A discussion of the evolution of the project to significantly reduce licensing issues is provided, followed by a summary of the IRIS safety-by-design which provides a formidable first step in the Defense in Depth approach. The effects of the safety-by-design, as well as of passive systems, on the IRIS safety will be investigated in a proposed testing program that will be reviewed by NRC during the pre-application. Documentation to be provided to NRC is discussed. Early design analyses indicate that the benefits of the IRIS safety-by-design approach are so significant that the basic premise of current emergency planning regulations (i.e., likelihood of core damage) will be reduced to the extent that special emergency response planning beyond the exclusion area boundary may not be needed. How this very significant outcome can be effected through a highly risk-informed licensing is discussed. (author)

  3. 21 CFR 515.10 - Medicated feed mill license applications.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Medicated feed mill license applications. 515.10... (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Applications § 515.10 Medicated feed mill license applications. (a) Medicated feed mill license applications (Forms FDA 3448) may...

  4. Product Licenses Database Application

    CERN Document Server

    Tonkovikj, Petar

    2016-01-01

    The goal of this project is to organize and centralize the data about software tools available to CERN employees, as well as provide a system that would simplify the license management process by providing information about the available licenses and their expiry dates. The project development process is consisted of two steps: modeling the products (software tools), product licenses, legal agreements and other data related to these entities in a relational database and developing the front-end user interface so that the user can interact with the database. The result is an ASP.NET MVC web application with interactive views for displaying and managing the data in the underlying database.

  5. 75 FR 72824 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-11-26

    ... & OFF License. Everglory Logistics, Inc. (NVO & OFF), 440 McClellan Highway, 105F2, East Boston, MA..., Application Type: New NVO & OFF License. Hawaii Intermodal Tank Transport, LLC (NVO & OFF), 2350 S. Dock... Tran, Manager, Application Type: New NVO & OFF License. ITL USA Inc. dba International Transport...

  6. Review process for license renewal applications

    International Nuclear Information System (INIS)

    Craig, John W.; Kuo, P.T.

    1991-01-01

    In preparation for license renewal reviews, the Nuclear Regulatory Commission has recently published for public review and comment a proposed rule for license renewal and a draft Standard Review Plan as well as a draft Regulatory Guide relating to the implementation of the proposed rule. In support of future license renewal applications, the nuclear industry has also submitted 11 industry reports for NRC review and approval. This paper briefly describe how these parallel regulatory and industry activities will be factored into the NRC review process for license renewal. (author)

  7. 25 CFR 141.9 - Application for license renewal.

    Science.gov (United States)

    2010-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES BUSINESS PRACTICES ON... the applicant has made as a reservation business owner and the applicant's present fitness to reside... pending consideration of application for license renewal. (c) Prior to expiration of the existing license...

  8. Personality traits of Turkish handgun license applicants.

    Science.gov (United States)

    Selek, Salih; Can, Serdar S; Yabanoglu, Ihsan

    2012-10-01

    Several theories have sought to explain the motivations for handgun possession and the relationship with personality. Perception of handguns also has cultural variations. The aim of the study is to evaluate handgun license applicants' personality profiles. 109 handgun license applicants were included in the study. Temperament and Character Inventory (TCI) scores of the applicants were recorded. Scores were compared with Turkish and American normative data for the Inventory. The study group had significantly lower subscores on novelty seeking, harm avoidance, and higher subscores on reward dependence and persistence compared to Turkish norms and significantly lower subscores on novelty seeking, reward dependence, and self-directedness compared to American norms. Results indicate that Turkish handgun license applicants' personality features are more similar to American norms.

  9. 75 FR 46938 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-08-04

    ... Logistics LLC (NVO), 120 S. Woodland Blvd., 216, DeLand, FL 32720, Officers: Dietmar Lutte, Manager Member, (Qualifying Individual), Susan Lutte, Member, Application Type: New NVO License. Bridgeline Logistics..., (Qualifying Individual), Application Type: New OFF License. [[Page 46939

  10. 77 FR 20398 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-04-04

    ...), Svi Soudai, Manager, Application Type: New OFF License. Armada USA, LLC dba Armada Logistics (NVO... Logistics (NVO & OFF), 435 Division Street, Elizabeth, NJ 07076, Officer: Carlos E. Feliu, President.../Treasurer, (Qualifying Individual), Application Type: New NVO License. HYC Logistics, Inc. (NVO & OFF), 2600...

  11. 47 CFR 80.53 - Application for a portable ship station license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Application for a portable ship station license... SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Applications and Licenses § 80.53 Application for a portable ship station license. The Commission may grant a license permitting operation of a...

  12. 76 FR 44330 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-07-25

    .... Nguyen, Secretary/CFO, Application Type: New NVO & OFF License. Atlas Logistics LLC (NVO & OFF), 2801 NW...), Application Type: New NVO & OFF License. Bulk Cargo Services & Logistics Inc. (OFF), 15400 N.E. 103rd Drive..., Member/Chief Executive Manager, (Qualifying Individual), Stina Storr, Member/ Managing Member...

  13. 77 FR 24712 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-04-25

    ... Global Logistics LLC (OFF), 9816 Whithorn Drive, Suite B, Houston, TX 77095, Officer: Herbert R. Hogg, Operating Manager (Qualifying Individual), Application Type: New OFF License. Toyo Logistics America, Inc... Individual), Application Type: New NVO License. Choiceone Logistics, Inc. (NVO & OFF), 10025 NW 116th Way, 17...

  14. 75 FR 61757 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-10-06

    ...), Jinho Um, CFO. Application Type: New NVO & OFF License. Junction Int'l Logistics, Inc. (NVO), 17870 Castleton Street, Suite 107, City of Industry, CA 91748. Officers: Charles Kuo, Secretary (Qualifying.... Application Type: New NVO & OFF License. Red Arrow Consulting, Inc. dba Red Arrow Logistics (OFF), 14925 SE...

  15. 78 FR 6325 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-01-30

    .... Application Type: New NVO & OFF License. Naca Logistics (USA), Inc. dba Brennan International Transport, dba...). Application Type: New NVO & OFF License. Miami Freight & Logistics Services, Inc. (NVO & OFF), 3630 NW 76th... World Shipping, dba OWS, dba Ocean Express, dba Oceanexpress Vanguard Logistics Services, dba Vanguard...

  16. Licensing process in Finland

    International Nuclear Information System (INIS)

    Tiippana, Petteri

    2011-01-01

    In accordance with the Nuclear Energy Act, the use of nuclear energy constitutes operations subject to license. The licensing process and conditions for granting a license is defined in the legislation. The licenses are applied from and granted by the Government. This paper discusses briefly the licensing process in Finland and also the roles and responsibilities of main stakeholders in licensing. Licensing of a nuclear power plant in Finland has three steps. The first step is the Decision in Principle (DiP). Goal of DiP is to decide whether using nuclear power is for the overall good for the Finnish society. The second step is Construction License (CL) and the goal of CL phase is to determine whether the design of the proposed plant is safe and that the participating organisations are capable of constructing the plant to meet safety goals. The third step is the Operating License (OL) and the goal of the OL phase is to determine whether the plant operates safely and licensee is capable to operate the plant safely. Main stakeholders in the licensing process in Finland are the utility (licensee) interested in using nuclear power in Finland, Ministry of Employment and the Economy (MEE), Government, Parliament, STUK, the municipality siting the plant and the general public. Government grants all licenses, and Parliament has to ratify Government's Decision in Principle. STUK has to assess the safety of the license applications in each step and give statement to the Ministry. Municipality has to agree to site the plant. Both STUK and the municipality have a veto right in the licensing process

  17. 77 FR 59193 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-09-26

    ... Type: New OFF License. Bring Logistics US, Inc. (NVO & OFF), 4500 N. Sam Houston Parkway W., 130...: New NVO & OFF License. Contract Logistics, LLC (NVO & OFF), 4911 N. Portland Avenue, Suite 200.... Roush, Manager, Application Type: New NVO & OFF License. Crescent Line Inc. dba Globe Express Services...

  18. 76 FR 79682 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-12-22

    ... at (202) 523-5843 or by email at [email protected] . A.C.T. Logistics, LLC (NVO), 154-09 146th Avenue, 3rd...-President/Secretary. Application Type: License Transfer. Canyon Global Logistics, LLC (NVO & OFF), 2928-B..., General Manager, (Qualifying Individual), Oleg Ardachev, President. Application Type: New OFF License...

  19. 76 FR 70145 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-11-10

    ...). Application Type: New NVO License. Alomar Transport, Inc. (NVO & OFF), 150-30 132nd Avenue, Suite 303, Jamaica... & OFF License. Forward System Logistics Inc. (NVO), 144-54 156th Street, Jamaica, NY 11434. Officers... NVO License. Green Line Shipping & Logistics Services Inc. (NVO & OFF), 16230 Lake View Lane, Apple...

  20. PROCESS FOR LICENSE APPLICATION DEVELOPMENT FOR THE GEOLOGIC REPOSITORY

    International Nuclear Information System (INIS)

    DOUGLAS M. FRANKS AND NORMAN C. HENDERSON

    1997-01-01

    The Department of Energy (DOE), specifically the Office of Civilian Radioactive Waste Management (OCRWM) has been charged by the U.S. Congress, through the Nuclear Waste Policy Act (NWPA), with the responsibility for obtaining a license to develop a geologic repository. The NRC is the licensing authority for geologic disposal, and its regulations pertinent to construction authorization and license application are specified in 10 CFR Part 60, Disposal of High-Level Radioactive Wastes in Geologic Repositories, (section)60.21ff and (section)60.31ff. This paper discusses the process the Yucca Mountain Site Site Characterization Project (YMP) will use to identify and apply regulatory and industry guidance to development of the license application (LA) for a geologic repository at Yucca Mountain, Nevada. This guidance will be implemented by the ''Technical Guidance Document for Preparation of the License Application'' (TGD), currently in development

  1. Process for license application development for the geologic repository

    International Nuclear Information System (INIS)

    Franks, D.M.; Henderson, N.C.

    1998-01-01

    The Department of Energy (DOE), specifically the Office of Civilian Radioactive Waste Management (OCRWM) has been charged by the US Congress, through the Nuclear Waste Policy Act (NWPA), with the responsibility for obtaining a license to develop a geologic repository. The NRC is the licensing authority for geologic disposal, and its regulations pertinent to construction authorization and license application are specified in 10 CFR Part 60, Disposal of High-Level Radioactive Wastes in Geologic Repositories, section 60.21ff and section 60.31ff. This paper discusses the process the Yucca Mountain Site Characterization Project (YMP) will use to identify and apply regulatory and industry guidance to development of the license application (LA) for a geologic repository at Yucca Mountain, Nevada. This guidance will be implemented by the Technical Guidance Document for Preparation of the License Application (TGD), currently in development

  2. 76 FR 30360 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-05-25

    .... Application Type: Trade Name Change. B&O Logistics, Inc. (NVO), 19310 Pacific Gateway Drive, Torrance, CA.... Application Type: New NVO License. Charity Cargo L.L.C. (NVO & OFF), 1423 Kaleilani Street, Pearl City, HI... License. GreenLine Trade, LLC dba GreenLine Logistics (OFF), 14205 SE 36th, Suite 100, Bellevue, WA 98006...

  3. 77 FR 71002 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-11-28

    ..., Washington, DC 20573, by telephone at (202) 523-5843 or by email at [email protected] . 5G Logistics Solutions LLC..., President. Application Type: New NVO & OFF License. Bennett International Transport, L.L.C. (NVO & OFF.... Castano, COO. Application Type: New NVO & OFF License. James J. Boyle & Co. dba JJB Global Logistics Co...

  4. 21 CFR 515.11 - Supplemental medicated feed mill license applications.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Supplemental medicated feed mill license... SERVICES (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Applications § 515.11 Supplemental medicated feed mill license applications. (a) After approval of a medicated feed...

  5. 78 FR 66713 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-11-06

    ..., Washington, DC 20573, by telephone at (202) 523-5843 or by email at [email protected] . Action One Logistics, Inc..., Operating Manager (QI), Joseph Lam, Member, Application Type: New NVO License. Altex US, LLC (NVO & OFF), 1... President, Application Type: New NVO & OFF License. Andes Logistics USA LLC (NVO & OFF) 7500 NW 25 Street, 7...

  6. 78 FR 20106 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-04-03

    ... M. Tsai, President (QI). Application Type: New NVO License. American International Shipping Company... Type: New NVO License. Nippon Concept America, LLC (OFF), 2203 Timberloch Place, Suite 218D, The...

  7. Workshop on Regulatory Review and Safety Assessment Issues in Repository Licensing

    International Nuclear Information System (INIS)

    Wilmot, Roger D.

    2011-02-01

    The workshop described here was organised to address more general issues regarding regulatory review of SKB's safety assessment and overall review strategy. The objectives of the workshop were: - to learn from other programmes' experiences on planning and review of a license application for a nuclear waste repository, - to offer newly employed SSM staff an opportunity to learn more about selected safety assessment issues, and - to identify and document recommendations and ideas for SSM's further planning of the licensing review

  8. 47 CFR 87.47 - Application for a portable aircraft station license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Application for a portable aircraft station... SPECIAL RADIO SERVICES AVIATION SERVICES Applications and Licenses § 87.47 Application for a portable aircraft station license. A person may apply for a portable aircraft radio station license if the need...

  9. Licensing of the OPAL reactor during construction and commissioning

    International Nuclear Information System (INIS)

    Summerfield, M.

    2007-01-01

    This paper presents a description of the licensing activities associated with the construction and commissioning of the Australian Nuclear Science and Technology Organisation's (ANSTO) OPAL reactor. It addresses the Construction Licence, the interface between ANSTO, INVAP (the contractor with responsibility for design and construction of the facility) and the Australian Radiation Protection and Nuclear Safety Agency (ARPANSA, the Australian nuclear regulator) during the construction of OPAL, specific licensing issues that have arisen during the construction and commissioning process, and the Operating Licence Application. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and the lessons learnt that may be of benefit to other licensees and regulators

  10. Self-management of self-organising mobile computing applications : a separation of concerns approach

    OpenAIRE

    Fernandez Marquez, Jose Luis; di Marzo Serugendo, Giovanna; Stevenson, Graeme Turnbull; Ye, Juan; Dobson, Simon Andrew; Zamonelli, Franco

    2014-01-01

    Although the research area of self-organising systems is well established, their construction is often ad hoc. Consequently, such software is difficult reuse across applications that require similar functionality of have similar goals. The development of self-organising applications and, a fortiori, self-organising mobile applications is therefore limited to developers who are experts in specific self-organising mechanisms. As a first step towards addressing this, this paper discusses the not...

  11. 75 FR 48686 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-08-11

    ...: New NVO License. Maritime and Intermodal Logistics Systems, Inc. dba MILS dba Fesco Integrated..., Senior Vice President/General Manager (Qualifying Individual), Kenryo Senda, President/CEO, Application...: New NVO & OFF License. Rado International, Inc. dba Rado Logistics (NVO & OFF), 2251 Sylvan Road...

  12. Workshop on Regulatory Review and Safety Assessment Issues in Repository Licensing

    Energy Technology Data Exchange (ETDEWEB)

    Wilmot, Roger D. (Galson Sciences Limited (United Kingdom))

    2011-02-15

    The workshop described here was organised to address more general issues regarding regulatory review of SKB's safety assessment and overall review strategy. The objectives of the workshop were: - to learn from other programmes' experiences on planning and review of a license application for a nuclear waste repository, - to offer newly employed SSM staff an opportunity to learn more about selected safety assessment issues, and - to identify and document recommendations and ideas for SSM's further planning of the licensing review

  13. Regulations and the licensing process in Austria

    International Nuclear Information System (INIS)

    Matulla, Herbert U.

    1979-01-01

    A review of the licensing process which took place from 1971 to 1978 shows which laws, regulations and standards were used in checking the safety aspects of the nuclear power plant and which organisations participated in the licensing process. The internal organisation of the Austrian main-expert in the procedure is illustrated. Examples of detail-work are explained. The importance of intensive co-operation of the different technical groups and the problems of comparable examination depth are underlined. (author)

  14. 77 FR 18815 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-03-28

    ... NVO License. American Patriot Lines, Inc. dba Tier One Logistics (NVO), 8616 La Tijera Boulevard, 401..., AL 36608. Officer: Samford T. Myers, Manager (Qualifying Individual). Application Type: New NVO & OFF License. Bluesea Logistics Corporation (NVO), 327 Elizabeth Avenue, Apt. A, Monterey Park, CA 91755-2044...

  15. Republished: Fibrosing organising pneumonia.

    Science.gov (United States)

    Beardsley, Brooke; Rassl, Doris

    2014-08-01

    Organising pneumonia (otherwise referred to as bronchiolitis obliterans organising pneumonia) is characterised histologically by plugs of granulation tissue, which are present predominantly within small airways, alveolar ducts and peri-bronchiolar alveoli. This pattern is not specific for any disorder or cause, but is one type of inflammatory response to pulmonary injury, which may be seen in a wide variety of clinical conditions. Typically, organising pneumonia responds very well to corticosteroid treatment; however, a small percentage of patients appear to develop progressive fibrosis. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  16. 77 FR 43599 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-07-25

    ... OFF License. Logistics International Parcel Shipping Transport LLC (NVO), 182 West Melrose Avenue, 2... Schwartz, Director, Application Type: New OFF License. Brox Logistics USA, LLC (NVO,) 244 5th Avenue, V-280... Agency Corporation, dba C&F Worldwide Logistics. Cargois Inc. dba Star Vision Logis (NVO), 2700 Coyle...

  17. 76 FR 28778 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-05-18

    ... Individual), Application Type: New NVO & OFF License. Asian Link Logistics, LLC dba Best Global (NVO & OFF... Type: New NVO License. Hansa Meyer Global Transport USA, LLC dba Hansa Shipping LLC, (OFF), 712 Main... & Logistics (Private) Limited dba, Nashrah Shipping and Logistics (NVO), Mezzanine Floor, Trade Ave., Tower 1...

  18. Licensing process for future applications of advanced-design nuclear reactors

    International Nuclear Information System (INIS)

    Miller, C.L.

    1990-01-01

    The existing 10CFR50 two-step licensing process in the Code of Federal Regulations can continue to be a viable licensing vehicle for future applications, at least for the near future. The US Nuclear Regulatory Commission (NRC) Commissioners and staff, the public, and the utilities (along with supporting architect/engineers and nuclear steam supply system vendors) have a vast body of experience and knowledge of the existing part 50 licensing process. All these participants are familiar with their respective roles in this process, and history shows this process to be a workable licensing vehicle. Nevertheless, the use of 10CFR52 should be encouraged for future applications. This proposed new rule is intended to achieve the early resolution of licensing issues, to reduce the complexity and uncertainty of the licensing process, and enhance the safety and reliability of nuclear power plants. Part 52's overall purpose is to improve reactor safety and streamline the licensing process by encouraging the use of standard reactor designs and by allowing the early resolution of site environmental and reactor safety issues. The public should be afforded an earlier entry into the licensing process as a result of design certification rulemaking process and combined construction permit/operating license hearings

  19. 75 FR 80499 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-12-22

    ... Individual), Jeffrey Cullen, President. Application Type: QI Change. Cala Distribution, LLC (NVO), 2705 NW..., (Qualifying Individual), William S. Askew, Manager. Application Type: New NVO License. Encar Trading, Corp...

  20. License application approach for the California LLRW disposal facility

    International Nuclear Information System (INIS)

    Gaynor, R.K.; Romano, S.A.; Hanrahan, T.P.

    1990-01-01

    US Ecology, Inc. is the State of California's license designee to site, develop and operate a low-level radioactive waste (LLRW) disposal facility to serve member states of the Southwestern Compact. US Ecology identified a proposed site in the Ward Valley of southeastern California in March 1988. Following proposed site selection, US Ecology undertook studies required to prepare a license application. US Ecology's license application for this desert site was deemed complete for detailed regulatory review by the California Department of Health Services (DHS) in December 1989. By mutual agreement, disposal of mixed waste is not proposed pending the State of California's decision on appropriate management of this small LLRW subset

  1. 21 CFR 515.20 - Approval of medicated feed mill license applications.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Approval of medicated feed mill license... SERVICES (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Administrative Actions on Licenses § 515.20 Approval of medicated feed mill license applications. Within 90 days after an...

  2. 78 FR 21930 - Aquenergy Systems, Inc.; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2013-04-12

    ... Systems, Inc.; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License...: November 11, 2012. d. Submitted by: Aquenergy Systems, Inc., a fully owned subsidiaries of Enel Green Power...

  3. 76 FR 22104 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-04-20

    ...), Application Type: Business Structure Change Foothills Logistics, Inc. (NVO), 2045 John Crosland Jr. Way... Individual), Daniel Gelpi, President, Application Type: Add NVO Service ADM Logistics, Inc. (NVO & OFF), 4666... (Qualifying Individual), Application Type: New NVO & OFF License ATC Logistics, Inc. (NVO & OFF), 14350...

  4. 78 FR 50054 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-08-16

    ...), Ross V. Stemmler, President, Application Type: QI Change. Dawson Logistics, Inc. (OFF), 2220 South... (QI), Chad Earwood, President, Application Type: Add NVO Service. Fesco Integrated Transport North...), Ugochukwu O. Ene, President, Application Type: New NVO & OFF License. Icon Logistics Services LLC (OFF...

  5. 78 FR 37324 - Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications

    Science.gov (United States)

    2013-06-20

    ... Environmental Reports for Nuclear Power Plant License Renewal Applications AGENCY: Nuclear Regulatory Commission... for Nuclear Power Plant License Renewal Applications.'' This regulatory guide provides guidance to... renewal of a nuclear power plant operating license. Applicants should use this regulatory guide when...

  6. 78 FR 17205 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-03-20

    .... Sicilia, Member, Application Type: New NVO & OFF License. Brookfield Relocation Inc. (OFF), Two Corporate... Schwartz, President, Application Type: QI Change. Covenant Global Logistics Inc (NVO & OFF), 440 Benmar..., President, Application Type: Add Trade Name CGL Shipping. EXL Logistics, Inc. (NVO), 1444 NW 82nd Avenue...

  7. 78 FR 75345 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-12-11

    .... Romero, President (QI). Application Type: New NVO & OFF License. F.H.L. Logistics, Inc. (NVO & OFF), 1354.... Officers: Arif H. Butt, General Manager (QI), Unni Krishnan Nair, President. Application Type: New NVO...: Stephen F. Crooks, Vice President (QI), Scott Kelly, President. Application Type: Adding NVO Service...

  8. Towards high-reliability organising in healthcare: a strategy for building organisational capacity.

    Science.gov (United States)

    Aboumatar, Hanan J; Weaver, Sallie J; Rees, Dianne; Rosen, Michael A; Sawyer, Melinda D; Pronovost, Peter J

    2017-08-01

    In a high-reliability organisation (HRO), safety and quality (SQ) is an organisational priority, and all workforce members are engaged, continuously learning and improving their work. To build organisational capacity for SQ work, we have developed a role-tailored capacity-building framework that we are currently employing at the Johns Hopkins Armstrong Institute for Patient Safety and Quality as part of an organisational strategy towards HRO. This framework considers organisation-wide competencies for SQ that includes all staff and faculty and is integrated into a broader organisation-wide operating management system for improving quality. In this framework, achieving safe, high-quality care is connected to healthcare workforce preparedness. Capacity-building efforts are tailored to the needs of distinct groups within the workforce that fall within three categories: (1) front-line providers and staff, (2) managers and local improvement personnel and (3) SQ leaders and experts. In this paper we describe this framework, our implementation efforts to date, challenges met and lessons learnt. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  9. 15 CFR 748.9 - Support documents for license applications.

    Science.gov (United States)

    2010-01-01

    ... licensing action, since end-uses and other considerations are important factors in the decision making... promptly notifying BIS of any change in the facts contained in the support document that comes to your attention. (h) Effect on license application review. BIS reserves the right in all respects to determine to...

  10. Other best-estimate code and methodology applications in addition to licensing

    International Nuclear Information System (INIS)

    Tanarro, A.

    1999-01-01

    Along with their applications for licensing purposes, best-estimate thermalhydraulic codes allow for a wide scope of additional uses and applications, in which as realistic and realizable results as possible are necessary. Although many of these applications have been successfully developed nowadays, the use of best-estimate codes for applications other than those associated to licensing processes is not so well known among the nuclear community. This issue shows some of these applications, briefly describing their more significant and specific features. (Author)

  11. Licensing of ANSTO's Replacement Research Reactor

    International Nuclear Information System (INIS)

    Summerfield, M.W.; Garea, V.

    2003-01-01

    This paper presents a general description of the licensing of the 20 MW Pool-type Replacement Research Reactor (RRR) currently being built by the Australian Nuclear Science and Technology Organisation (ANSTO) at their Lucas Heights site. The following aspects will be addressed: 1) The influence of ARPANSA's (the Australian regulator) Regulatory Assessment Principles and Design Criteria on the design of the RRR. 2) The Site Licence Application, including the EIS and the supporting siting documentation. 3) The Construction Licence Application, including the PSAR and associated documentation. 4) The review process, including the IAEA Peer Review and the Public Submissions as well as ARPANSA's own review. 5) The interface between ANSTO, INVAP and ARPANSA in relation to the ongoing compliance with ARPANS Regulation 51 and 54. 6) The future Operating Licence Application, including the draft FSAR and associated documentation. These aspects are all addressed from the point of view of the licensee ANSTO and the RRR Project. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and how the licensing and regulatory regime within Australia influenced the design of the RRR. In particular, the safety design features that have been incorporated as a result of the specific requirements of ANSTO and the Australian regulator will be briefly described. The paper will close with a description of how the RRR meets, and in many aspects exceeds the requirements of ANSTO and the Australian regulator. (author)

  12. 77 FR 37044 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-06-20

    ... 95695, Officer: Nasrullah Chaudhry, Member/Manager (Qualifying Individual), Application Type: Add NVO... (Qualifying Individual), Margaret Kong, CFO/Secretary, Application Type: New NVO & OFF License. FSG Logistics (USA), Inc. dba FSG Logistics, Inc. (NVO & OFF), 27013 Pacific Highway South, PMB386, Des Moines, WA...

  13. 76 FR 55909 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-09-09

    ..., LLC dba AIM Global Logistics (NVO & OFF), 6402 Teluco Street, Houston, TX 77055, Officer: Angelica Garcia-Dunn, Manager/President/Treasurer (Qualifying Individual), Application Type: New OFF & NVO License... Individual), Application Type: Name Change. BestOcean Worldwide Logistics, Inc. (NVO & OFF), 1300 Valley...

  14. 78 FR 18592 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-03-27

    ...), Veronica Alcestte, Manager, Application Type: New NVO & OFF License Worldcraft Logistics LLC (NVO & OFF.... Salvat, Vice President, Application Type: Add NVO Service Bayshore Logistics & Services, LLC (NVO & OFF), 909 Westfield Avenue, Elizabeth, NJ 07208, Officers: Raquel Velez, Operating Manager (QI), Jose Moreno...

  15. Application of relationship marketing in non-profit organisations ...

    African Journals Online (AJOL)

    Application of relationship marketing in non-profit organisations involved in the provision of sport and recreational services. ... A variety of factors have over time contributed to a need for marketing in non-profit ... AJOL African Journals Online.

  16. 76 FR 62407 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-10-07

    ... & Product Logistics Manager (Qualifying Individual), Thomas B. Crowley, Director, Application Type: QI... at (202) 523-5843 or by e-mail at [email protected] . Alltransport International Logistics, Inc. (NVO), 63... Individual), Application Type: New NVO License. American Global Logistics LLC dba AGL (NVO & OFF), 3399...

  17. 77 FR 40882 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-07-11

    ..., Director, Application Type: License Transfer & QI Change. Gulf Premier Logistics LLC (NVO & OFF), 340 N... & OFF), 1163 Fairway Drive, 106, City of Industry, CA 91789, Officer: XiuJi Zhang, President, (Qualifying Individual), Application Type: Add NVO Service. Simple Logistics Inc. (NVO), 147-35 Farmers...

  18. PBMR-SA licensing project organization

    International Nuclear Information System (INIS)

    Clapisson, G.A.; Metcalf, P.E.; Mysen, A.

    2001-01-01

    The South African nuclear regulatory authority, the Council for Nuclear Safety (CNS), is beginning the safety review of the Pebble Bed Modular Reactor (PBMR) design under development by the South African National Electrical Utility, Eskom. This paper describes the CNS licensing process, including the establishment of basic licensing criteria, general design criteria, and specific design rules, as well the safety assessment to be conducted in accordance with the established structure. It also summarises the CNS PBMR review project activities, including the overall organisational arrangements, licensing basis, safety and risk assessment, general operating rules and plant design engineering, and pre-operational testing. (author)

  19. 75 FR 20997 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-04-22

    ... 77354. Officers: Thomas C. Gaze, President, Qualifying Individual). Lori L. Gaze, Secretary/Treasurer... Services, (Qualifying Individual). George T. Cook, President/Treasurer, Application Type: New OFF License...

  20. 78 FR 48435 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-08-08

    ... Change. Ever Line Logistics Inc. (NVO & OFF), 147-35 Farmers Blvd., Suite 208, Jamaica, NY 11434, Officer: Caihong Yang, President (QI), Application Type: Name Change to Bona Logistics US Inc. Global Container.... Bote, Member/Manager, Edgar T. Bote, Member/Manager, Application Type: New NVO License. National Air...

  1. 78 FR 14792 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-03-07

    ...: Mohamed Y. Ali, Manager (QI); Abdul S. Mohamed, Member. Application Type: Add Trade Name Compass Logistics... Ugueto, Secretary. Application Type: New NVO & OFF License American Forwarding & Logistics, LLC (NVO & OFF), 1919 NW 19th Street, Unit 624, Ft. Lauderdale, FL 33311. Officers: Gabriele Awada, Manager (QI...

  2. 77 FR 45610 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-08-01

    ...), Richard A. Arkey, Vice President, Application Type: New NVO License. Aequus Worldwide Logistics Inc. (NVO..., Application Type: Name Change to Concepts in Freight, Inc. FGN Global Logistics, Inc. (NVO & OFF), 4770...), 341 Erickson Avenue, P.O. Box 124, Essington, PA 19029, Officers: Ari M. Bobrow, Export Manager...

  3. 77 FR 38288 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-06-27

    ..., President. Application Type: QI Change. Freight Logistics Services USA Forwarding Ltd (OFF), 15955 W. Hardy... Individual). Application Type: Add OFF Service. Pudong Prime Int'l Logistics, Inc. (NVO), 9660 Flair Drive... License. Benchmark Worldwide Logistics, Inc. dba Star Ocean Lines (NVO & OFF), 24900 South Route 53...

  4. 78 FR 48870 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-08-12

    ...: Tufan Duygun, Manager (QI), Ozisik Serhat, Member, Application Type: Add Trade Name Daimon Logistics USA. Logistics International Parcel Shipping Transport LLC (NVO), 391 Kent Avenue, Elk Grove, IL 60007, Officers...), Application Type: NVO & OFF License. Kesco Logistics, Inc. (NVO & OFF), 20 E. Sunrise Highway, Suite 308...

  5. Application of IC Card License for Road Transportation in Commercial Vehicles Supervision and Service

    Directory of Open Access Journals (Sweden)

    Li Weiwei

    2016-01-01

    Full Text Available IC card electronic license for road transport includes the IC card commercial vehicle’s certificate and IC card practitioner’s qualification certificate. In China, the IC card electronic license for road transport is the electronic ID card which must be carried by each commercial vehicles and practitioners. This paper briefly introduces the basic situation, data format and security keys architecture of IC card electronic license for road transportation of China. In order to strengthen the supervision and service of commercial vehicles, this paper puts forward the overall application framework of IC card electronic license for road transport. The application examples of IC card license in the supervision of passenger station, dangerous goods transport management, governance overload and logistics park and port area management are discussed. The practical application results show that the application of IC card electronic license for road transport is an important technical means to improve the supervision ability and service quality of the road transportation industry.

  6. NPP long term operation in Spain - First application for license renewal

    International Nuclear Information System (INIS)

    Francia, L.; Gorrochategui, I.; Marcos, R.

    2007-01-01

    Full text: In the operation of the Spanish nuclear power plants (NPP), safety is always the prime consideration. Plant Life Management Programmes have been set up with the strategic objective to operate the NPPs as long as they are considered safe and reliable. The safety of each NPP is reviewed by the Spanish nuclear regulatory authority (CSN) under a continuous process. In addition, experience is gained from operating the plants and from exchanges with operators of similar units. Current Spanish regulatory framework for renewing NPP operating licenses requires performing a Periodic Safety Review (PSR) to be performed every 10 years and submitted when applying for a new renewal of the NPP operating license. A few years ago, CSN issued a document regarding the licensing requirements that nuclear power plants should meet in order to be granted with an operating license for long term operation (i.e, operation beyond the original plant design life, typically 40 years). Besides the traditional PSR requirements, specific requirements regarding to long term operation (LTO) include: - An Aging Management and Evaluation Program, including the identification and evaluation of Time Limited Aging Analysis (TLAA). - An updated Radiological Impact Study. - A review and assessment of regulation/standard applicability. Garona NPP (GE, BWR/3 design) operated by Spanish utility Nuclenor from 1971 has a current operating license up to 2009. A decision was made to apply for a new operating license, being Garona plant the first one in Spain to face with the new long term operation requirements. The paper will provide an overview of the methodology used in Spain to address and perform the required analyses to support the LTO application for the operating license renewal. In particular, focus will be paid on the project developed in Garona (2002-2006) whose result has been the first Spanish application for License Renewal for LTO. Also it will be reported the ongoing work necessary to

  7. 78 FR 55698 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-09-11

    ...), Karla Costilla, Member/Manager, Application Type: New NVO & OFF License. ICAT Logistics, Inc. (OFF..., Washington, DC 20573, by telephone at (202) 523-5843 or by email at [email protected] . Abaco Logistics Corporation..., CFO, Application Type: QI Change & Add OFF Service. American General Logistics, Inc. (NVO), 626 N...

  8. 75 FR 57798 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-09-22

    ..., (Qualifying Individual). Application Type: New NVO & OFF License. Cambria Global Logistics, LLC (OFF), 12140...). Application Type: QI Change. K&K Express, LLC dba K2 Logistics (NVO & OFF), 2980 Commers Drive, 100, Eagan, MN... Global Transport (NVO), 8636 York Circle, La Palma, CA 90623. Officer: Smile Cha, Sole Proprietor...

  9. 77 FR 12583 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-03-01

    ... Hermo, Vice President, Application Type: New NVO & OFF License. B2B Global Logistics Incorporated (NVO... Change. Global Logistics New Jersey Limited Liability Company (NVO & OFF) 275 Veterans Boulevard...

  10. 76 FR 47182 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-08-04

    ... Street, Tampa, FL 33619, Officers: Margara L. Barillas, President (Qualifying Individual), Danihel I. Barillas, Secretary, Application Type: New NVO License. Russell A. Farrow (U.S.) Inc. (OFF & NVO), 4950...

  11. 77 FR 26008 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-05-02

    .... Forth-Matthews, President, Application Type: New OFF License. Azimuth Lines Inc. (OFF), 111 Ivy Lane.... (NVO), 1000 Lakes Drive, 260, West Covina, CA 91760, Officers: Larry Lee, Treasurer (Qualifying...

  12. 76 FR 67730 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-11-02

    ..., President, Application Type: Name Change/Trade Name Change Lion Transport, Inc. dba Amex Logistics (NVO... Individual), Caetano R. Lopes, Vice President, Application Type: Add NVO Service Eztrans Logistics Ltd. (NVO... Type: New OFF License LF Freight USA LLC dba LF Logistics dba LF Freight dba IDS Logistics USA, dba IDS...

  13. 77 FR 30530 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-05-23

    ... Individual), Application Type: New NVO License. Global Wine Logistics, Inc. (NVO & OFF), 197 Route 19 South... Hextall, President/CEO, Application Type: Add NVO Service/Trade Name Change. M & D Global Logistics, Inc... Service. Metro Freight Services, Inc. dba Maritime Express Lines (M.E.L.) (NVO & OFF), 1225 W. St. George...

  14. 77 FR 72863 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-12-06

    ... & D Transport, Inc. (NVO & OFF), 4869 Peavey Drive, Meridian, MS 39301. Officers: Uros Pejanovic, Vice... Nucete, Director. Application Type: New NVO & OFF License. Embarque Los Hidalgos LLC (NVO & OFF), 326...

  15. 76 FR 78007 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-12-15

    ..., (Qualifying Individual), Ruba Hindi, Member, Application Type: New OFF License. Kemka USA Limited Liability Company (NVO & OFF), 421 Lucy Court, South Plainfield, NJ 07080, Officer: Hsiang (Rita) Y. Hsiao, Member...

  16. 76 FR 56759 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-09-14

    ...), Ariel S. Villamayor, Limited Partner, Application Type: New OFF License. UTi, United States, Inc. dba UTi (NVO & OFF), 1660 Walt Whitman Road, Melville, NY 11747. Officers: Charles N. Deller, Vice...

  17. 75 FR 67973 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-11-04

    ... Individual), Joy V. Pareckattil, President/Director, Application Type: New NVO License. CJC Logistics Limited Liability Company dba CJC Container Line (NVO & OFF), 186 Alps Road, Wayne, NJ 07470. Officers: Oliver Rosca...

  18. 77 FR 70162 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-11-23

    ...), 900 Center Park Drive, Suite F, Charlotte, NC 28217, Officers: Paul L. Carter, Vice President (QI...), Application Type: New NVO License. Transport Partner (USA), Inc. (NVO & OFF), 2006 Cherry Hill Lane...

  19. 78 FR 38336 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-06-26

    ..., President (QI), Stephen B. Schwark, Treasurer, Application Type: License Transfer to EFL Container Lines...., Suite K, Mobile, AL 36609, Officers: Thomas (Mac) H. McPhillips IV, Assistant Vice President (QI), Oscar...

  20. 21 CFR 515.21 - Refusal to approve a medicated feed mill license application.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Refusal to approve a medicated feed mill license... SERVICES (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Administrative Actions on Licenses § 515.21 Refusal to approve a medicated feed mill license application. (a) The...

  1. 77 FR 64991 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-10-24

    ..., Manager/Member. Application Type: New NVO & OFF License. Hospitality Logistics International LLC (NVO...), 11690 NW. 105th Street, Law 4W, Miami, FL 33178. Officers: Chris Merritt, Vice President (QI), John H...

  2. 76 FR 23598 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-04-27

    ... Angeles, CA 90045, Officers: Ann L. Shang, CFO (Qualifying Individual), Yon L. Li, President, Application... Type: New NVO & OFF License. PME Logistics, Inc. (NVO), 19401 S. Main Street, Suite 102, Gardena, CA...

  3. 10 CFR 781.62 - Contents of a license application.

    Science.gov (United States)

    2010-01-01

    ... royalty fees or other consideration, if any, that the applicant would be willing to pay the Government for... application. An application for a license under a DOE invention must be accompanied by a processing fee of $25... towards royalty if royalties are charged, and must include the following information: (a) Identification...

  4. Examining the application of Web 2.0 in medical-related organisations.

    Science.gov (United States)

    Chu, Samuel Kai Wah; Woo, Matsuko; King, Ronnel B; Choi, Stephen; Cheng, Miffy; Koo, Peggy

    2012-03-01

    This study surveyed Web 2.0 application in three types of selected health or medical-related organisations such as university medical libraries, hospitals and non-profit medical-related organisations. Thirty organisations participated in an online survey on the perceived purposes, benefits and difficulties in using Web 2.0. A phone interview was further conducted with eight organisations (26.7%) to collect information on the use of Web 2.0. Data were analysed using both quantitative and qualitative approaches. Results showed that knowledge and information sharing and the provision of a better communication platform were rated as the main purposes of using Web 2.0. Time constraints and low staff engagement were the most highly rated difficulties. In addition, most participants found Web 2.0 to be beneficial to their organisations. Medical-related organisations that adopted Web 2.0 technologies have found them useful, with benefits outweighing the difficulties in the long run. The implications of this study are discussed to help medical-related organisations make decisions regarding the use of Web 2.0 technologies. © 2011 The authors. Health Information and Libraries Journal © 2011 Health Libraries Group.

  5. 76 FR 72984 - Revised Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2011-11-28

    ... NUCLEAR REGULATORY COMMISSION Revised Application for a License To Export High-Enriched Uranium The application for a license to export high-enriched Uranium has been revised as noted below. Notice... fabricate fuel France. Security Complex; October 18, Uranium (93.35%). uranium (174.0 elements in France...

  6. Use of limited information in a license application to construct a repository

    International Nuclear Information System (INIS)

    McGarry, J.M. III; Echols, F.S.

    1996-01-01

    The purpose of this paper is to provide a rationale for the proposition that the Department of Energy's (DOE's) submittal of a license application (LA) for the construction of a geologic repository to the Nuclear Regulatory Commission (NRC) may be, and arguably must be, based on statutorily-limited site characterization data and design information. The Nuclear Waste Policy Act of 1982 (NWPA), as amended, is the controlling statute for the disposal of spent nuclear fuel in a licensed geologic repository. Applicable NRC regulations for the licensing of such a repository are found for the most part in 10 C.F.R. Part 60

  7. How a regulator is preparing for reviewing a license application file: The case of ASN

    International Nuclear Information System (INIS)

    Tanguy, Loic

    2014-01-01

    The French Nuclear Safety Authority (ASN) is an independent administrative authority. It prepares regulation pertaining to the management of radioactive waste, monitors the control of safety of basic nuclear installations that produce or treat waste or are involved in their disposal and performs inspections of waste producers (EDF, AREVA, CEA, hospitals, research centres, etc.) and Andra, the French National Radioactive Waste Management Agency. It regulates the overall system set up by Andra for accepting waste from producers and assesses waste management policy and the practices of radioactive waste producers. It reviews license applications and authorises commissioning of nuclear installations. In order to review technical documents, ASN benefits from the expertise of technical support organisations. The French Institute for Radiation Protection and Nuclear Safety (IRSN) is the main such organisation. ASN has been making efforts to diversify its experts for several years. In preparing its decisions, ASN also calls on the opinions and recommendations of seven Advisory Committees of Experts (GPE), with expert knowledge in the areas of waste, nuclear pressure equipment, medical exposure, non-medical radiation protection, reactors, transport, and laboratories and nuclear plants. ASN consults the GPEs in preparing its main decisions. In particular, they review the preliminary, provisional and final safety analysis reports for each nuclear installation. They can also be consulted about changes in regulations or doctrine. (authors)

  8. 10 CFR 81.40 - Contents of a license application.

    Science.gov (United States)

    2010-01-01

    ... categories: (i) Small business firm; (ii) Minority business enterprise; (iii) Location in a surplus labor... correspondence should be sent and any notices served; (4) Nature and type of applicant's business; (5...; (6) Purpose for which the license is desired, and a brief description of applicant's plan to achieve...

  9. License renewal - an idea whose time has come. Hatch nuclear plant license renewal program: an actual example of application of the license renewal rule to the Intake Structure

    International Nuclear Information System (INIS)

    Chandiwala, F.; Evans, W.P.

    1999-01-01

    After the NRC issued a revised license renewal rule in May 1995, the nuclear industry focussed on developing generic industry for implementing the rule and testing the guidance through various demonstration programs and work products in conjunction with the NRC. In addition, plant-specific programs also proceeded forward. These activities show that implementation issues continue to exist. Since the issuance of the rule, the NRC has issued a draft standard review plan for license renewal (SRP-LR), working draft, September 1997. Southern Nuclear Operating Company (SNC) has begun development work on a license renewal application for Plant Hatch Units 1 and 2. Plant Hatch Units 1 and 2 are BWR 4, Mark I plants whose operating licenses expire in 2014 and 2018, respectively. The Plant Hatch initiative also involves teaming with other boiling water reactors (BWRs) to develop the license renewal technology within the BWR fleet, and to support Plant Hatch by providing an oversight role for the application process. The teaming effort involved two other utilities, each being assigned to prepare a common report on a mechanical system or a structure. The common report could be presented to the NRC with modifications to suit the individual plants, thereby saving time and money, and hopefully resulting in quicker approval by the NRC. The desired license renewal process end result is a renewed license with up to a 20 year extension (10CFR 54.31(b)). (orig.)

  10. 76 FR 65544 - Standard Format and Content of License Applications for Mixed Oxide Fuel Fabrication Facilities

    Science.gov (United States)

    2011-10-21

    ... NUCLEAR REGULATORY COMMISSION [NRC-2009-0323] Standard Format and Content of License Applications... revision to regulatory guide (RG) 3.39, ``Standard Format and Content of License Applications for Mixed Oxide Fuel Fabrication Facilities.'' This guide endorses the standard format and content for license...

  11. 76 FR 59173 - Standard Format and Content of License Applications for Conventional Uranium Mills

    Science.gov (United States)

    2011-09-23

    ... NUCLEAR REGULATORY COMMISSION [NRC-2008-0302] Standard Format and Content of License Applications for Conventional Uranium Mills AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide..., ``Standard Format and Content of License Applications for Conventional Uranium Mills.'' DG- 3024 was a...

  12. 76 FR 6135 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-02-03

    ... Lawin Cargo dba, Bahaghari Express Cargo (NVO), 761 Highland Place, San Dimas, CA 91773, Officer..., Application Type: New NVO License. Four Points Ocean Inc. (NVO & OFF), 1460 Route 9 North, Suite 303.... Grannell, President/CEO (Qualifying Individual), Michael Kuhn, Vice President, Sales & Marketing...

  13. 76 FR 3636 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-01-20

    ..., Vice President, Application Type: New NVO & OFF License. CDS Global Logistics, Inc. (NVO & OFF), 1001... & Logistics LLC (NVO & OFF), Hoboken Business Center, 50 Harrison Street, Suite 204B, Hoboken, NJ 07030, Officers: Michelle L. Hasenauer, Manager (Qualifying Individual), Harbans S. Shrinkant, Manager...

  14. 75 FR 29545 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-05-26

    .... Atlantic Cargo Logistics LLC (OFF & NVO), 120 South Woodland Blvd., 216, Deland, FL 32720. Officers: Dietmar Lutte, Manager, (Qualifying Individual) Susan Lutte, Member, Application Type: New OFF & NVO License. Direct Delivery Logistics and Supply, LLC (OFF & NVO) 2006 Wilson Road, Humble, TX 77396...

  15. 76 FR 7209 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-02-09

    ... 77032. Officer: Walter Krauklis, OTI Compliance Officer (Qualifying Individual), Thomas B. Crowley, Jr... Road, Suite 14, Newtown Square, PA 19073. Officer: Thomas D. Torcomian, CEO/ Member (Qualifying...). Application Type: New OFF License. Solomon Emeke dba Desaiah Limited (OFF), 3696 Park Avenue, 300, Ellicott...

  16. 21 CFR 515.25 - Revocation of order refusing to approve a medicated feed mill license application or suspending...

    Science.gov (United States)

    2010-04-01

    ... medicated feed mill license application or suspending or revoking a license. 515.25 Section 515.25 Food and..., FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Administrative Actions on Licenses § 515.25 Revocation of order refusing to approve a medicated feed mill license application or suspending or revoking a...

  17. 75 FR 35815 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-06-23

    ..., TX 76011. Officers: Omar Kolaghassi, Manager (Qualifying Individual), Laura Alicia, Manager. Application Type: New OFF & NVO License. CALS Logistics USA, Inc. (OFF & NVO), 755 North Route 83, Suite 215.... Premium Star Logistics LLC dba O.P. Premium Star Logistics (OFF & NVO), 4200 Lightning Court, Bakersfield...

  18. 76 FR 16420 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-03-23

    ...), Andrew P. Bottomley, Managing Partner, Application Type: QI Change and Add OFF Service. All Transport... Type: New NVO & OFF License. Andrea Bigi dba AB Global Logistics Consulting (OFF), 1010 19th Street, 10.... Officers: Joanne Kirkpatrick, International Logistics Officer (Qualifying Individual), Jack R. Lentz, CEO...

  19. Application of up-front licensing

    Energy Technology Data Exchange (ETDEWEB)

    Grant, S D [Atomic Energy of Canada Ltd., Saskatoon, SK (Canada); Snell, V G [Atomic Energy of Canada Ltd., Mississauga, ON (Canada)

    1996-12-31

    AECL has been pioneering `up-front` licensing of new reactor designs. The CANDU 3 design has been formally reviewed by AECB staff for a number of years. The CANDU 9 design has just started the up-front licensing process. The process gives designers, regulators and potential customers early confidence in the licensability of future plants. (author). 4 refs., 2 tabs.

  20. Application of up-front licensing

    International Nuclear Information System (INIS)

    Grant, S.D.; Snell, V.G.

    1995-01-01

    AECL has been pioneering 'up-front' licensing of new reactor designs. The CANDU 3 design has been formally reviewed by AECB staff for a number of years. The CANDU 9 design has just started the up-front licensing process. The process gives designers, regulators and potential customers early confidence in the licensability of future plants. (author). 4 refs., 2 tabs

  1. Licensed reactor nuclear safety criteria applicable to DOE reactors

    International Nuclear Information System (INIS)

    1991-04-01

    The Department of Energy (DOE) Order DOE 5480.6, Safety of Department of Energy-Owned Nuclear Reactors, establishes reactor safety requirements to assure that reactors are sited, designed, constructed, modified, operated, maintained, and decommissioned in a manner that adequately protects health and safety and is in accordance with uniform standards, guides, and codes which are consistent with those applied to comparable licensed reactors. This document identifies nuclear safety criteria applied to NRC [Nuclear Regulatory Commission] licensed reactors. The titles of the chapters and sections of USNRC Regulatory Guide 1.70, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants, Rev. 3, are used as the format for compiling the NRC criteria applied to the various areas of nuclear safety addressed in a safety analysis report for a nuclear reactor. In each section the criteria are compiled in four groups: (1) Code of Federal Regulations, (2) US NRC Regulatory Guides, SRP Branch Technical Positions and Appendices, (3) Codes and Standards, and (4) Supplemental Information. The degree of application of these criteria to a DOE-owned reactor, consistent with their application to comparable licensed reactors, must be determined by the DOE and DOE contractor

  2. 77 FR 65887 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-10-31

    ..., Washington, DC 20573, by telephone at (202) 523-5843 or by email at [email protected] . ACM Logistics & Consulting... Type: New OFF License; Highland Project Logistics, Inc. (NVO & OFF), 35 Constitution Drive, Suite A.... Bonner, Special Manager (QI), Martine L. Plunkett, Manager, Application Type: Additional QI; Radiant...

  3. 77 FR 74186 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-12-13

    ... Logistics, Inc. (NVO & OFF), 7685 NW. 80th Terrace, Medley, FL 33166, Officers: Hugo E. Martinez, Secretary... & OFF), 1834 Harden Blvd., Lakeland, FL 33803, Officers: Steven C. Pniewski, Manager (QI), Manuel R. Echevarria, President, Application Type: New NVO & OFF License, Global Wide Logistics, Inc. (NVO), 1937 Davis...

  4. 78 FR 43202 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-07-19

    .... Alsea Global Logistics, LLC dba Alsea Global Logistics (NVO & OFF), 4836 SE Powell Blvd., Portland, OR... NVO & OFF License. Atlant Consulting Inc. dba Avro Logistics (NVO & OFF), 3626 Geary Blvd., Suite 206..., Officers: Paul Selvage, Member (QI), Steven Periman, Member/Manager, Application Type: Add Trade Name Blu...

  5. 76 FR 33757 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-06-09

    ... NVO & OFF License. The Ultimate Logistics Service Corporation (NVO & OFF), 3 Birch Place, Pine Brook... Logistics, Corp. (NVO), 4713 Deeboyar, Lakewood, CA 90712. Officer: Tan Sek, Pres/VP/Sec/Treasurer...), Application Type: Add OFF Service. Oceanic Link USA LLC (NVO & OFF), 5430 Jimmy Carter Blvd., Suite 216...

  6. 77 FR 13604 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-03-07

    ... A. Rincon, Manager (Qualifying Individuals), Application Type: Business Structure Change. De Well... Type: New NVO License. King Solomon Logistics Inc. (NVO), 135-14 Liberty Avenue, South [[Page 13605... Logistics Inc. (NVO), 167-16 146th Avenue, Suite 203, Jamaica, NY 11434, Officer: Yau Fung Ling, President...

  7. Licensed reactor nuclear safety criteria applicable to DOE reactors

    International Nuclear Information System (INIS)

    1993-11-01

    This document is a compilation and source list of nuclear safety criteria that the Nuclear Regulatory Commission (NRC) applies to licensed reactors; it can be used by DOE and DOE contractors to identify NRC criteria to be evaluated for application to the DOE reactors under their cognizance. The criteria listed are those that are applied to the areas of nuclear safety addressed in the safety analysis report of a licensed reactor. They are derived from federal regulations, USNRC regulatory guides, Standard Review Plan (SRP) branch technical positions and appendices, and industry codes and standards

  8. Standard format and content for a license application to store spent fuel and high-level radioactive waste

    International Nuclear Information System (INIS)

    1989-09-01

    Subpart B, ''License Application, Form, and Contents,'' of 10 CFR Part 72, ''Licensing Requirements for the Independent Storage of Spent Nuclear Fuel and High-Level Radioactive Waste,'' specifies the information to be covered in an application for a license to store spent fuel in an independent spent fuel storage installation (ISFSI) or to store spent fuel and high-level radioactive waste in a monitored retrievable storage facility (MRS). However, Part 72 does not specify the format to be followed in the license application. This regulatory guide suggests a format acceptable to the NRC staff for submitting the information specified in Part 72 for license application to store spent fuel in an ISFSI or to store spent fuel and high-level radioactive waste in an MRS

  9. 77 FR 35384 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-06-13

    ... Logistics LLC (NVO), 9814 Goldenglade Drive, Houston, TX 77064, Officer: Sandra Lesage, Member/Manager... telephone at (202) 523-5843 or by email at [email protected] . ABC Trucking and Logistics L.L.C. (OFF), 3080...), Lawrence R. Lammers, President/CEO, Application Type: License Transfer Atlantic Cargo Logistics LLC (NVO...

  10. 76 FR 38651 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-07-01

    ... Shipping (NVO), 1861 Western Way, Torrance, CA 90501. Officers: Hseanrus (Stephen) H. Lin, President/Vice..., President, Application Type: New NVO & OFF License. F.H.L. Logistics, Inc. (NVO & OFF), 1354 NW 78th Avenue..., Gardena, CA 90248. Officers: Anna W. Liu, Vice President (Operations), (Qualifying Individual), Quincy H...

  11. 77 FR 39707 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-07-05

    ..., Application Type: New OFF License. Best Global Logistics USA, Inc dba Siam Intercargo Services (NVO & OFF... International Transport, LLC (NVO), 6048 Lido Lane, Long Beach, CA 90803, Officer: Charles Brennan, Member...: Add NVO Service. Sinai Logistics LLC (NVO & OFF), 11419 NW. 112th Street, Medley, FL 33178, Officer...

  12. Resolving the issues arisen during the development of License Renewal Application at PAKS NPP

    International Nuclear Information System (INIS)

    Ratkai, Sandor; Katona, Tamas Janos

    2012-01-01

    Operational license of the four VVER-440/213 units at Paks NPP, Hungary is limited to the design lifetime of 30 years. Extension by an additional 20 years of the original license is one of the main goals of the plant owner. In 2008 a programme for long-term operation (LTO) was developed and submitted to the Hungarian Atomic Energy Authority. The LTO Programme defines the activities for ensuring the extension of the operational lifetime and contains the justification of the safe LTO. The LTO Programme has to be implemented and comprehensive justification of the safe LTO has to be provided in the formal License Renewal Applications unit by unit. This work has been completed by the end of 2011, and the application has been submitted for approval for the Unit 1. The authority review and the approval of the License Renewal Application for Unit 1 should be finished before the expiration of the original design lifetime in 2012. In line with the regulations and supporting the License Renewal Application, a large number of engineering tasks have been performed. In this paper the entire project will be reported. The issues will be discussed, which have been arisen during the development of the application. The difficulties caused by the Hungarian technical and regulatory peculiarities will be presented. (author)

  13. Revalidation and quality assurance: the application of the MUSIQ framework in independent verification visits to healthcare organisations.

    Science.gov (United States)

    Griffin, Ann; McKeown, Alex; Viney, Rowena; Rich, Antonia; Welland, Trevor; Gafson, Irene; Woolf, Katherine

    2017-02-14

    We present a national evaluation of the impact of independent verification visits (IVVs) performed by National Health Service (NHS) England as part of quality assuring medical revalidation. Organisational visits are central to NHS quality assurance. They are costly, yet little empirical research evidence exists concerning their impact, and what does exist is conflicting. The focus was on healthcare providers in the NHS (in secondary care) and private sector across England, who were designated bodies (DBs). DBs are healthcare organisations that have a statutory responsibility, via the lead clinician, the responsible officer (RO), to implement medical revalidation. All ROs who had undergone an IVV in England in 2014 and 2015 were invited to participate. 46 ROs were interviewed. Ethnographic data were gathered at 18 observations of the IVVs and 20 IVV post visit reports underwent documentary analysis. Primary outcomes were the findings pertaining to the effectiveness of the IVV system in supporting the revalidation processes at the DBs. Secondary outcomes were methodological, relating to the Model for Understanding Success in Quality (MUSIQ) and how its application to the IVV reveals the relevance of contextual factors described in the model. The impact of the IVVs varied by DB according to three major themes: the personal context of the RO; the organisational context of the DB; and the visit and its impact. ROs were largely satisfied with visits which raised the status of appraisal within their organisations. Inadequate or untimely feedback was associated with dissatisfaction. Influencing teams whose prime responsibility is establishing processes and evaluating progress was crucial for internal quality improvement. Visits acted as a nudge, generating internal quality review, which was reinforced by visit teams with relevant expertise. Diverse team membership, knowledge transfer and timely feedback made visits more impactful. Published by the BMJ Publishing Group

  14. 78 FR 73566 - Standard Format and Content for a License Application for an Independent Spent Fuel Storage...

    Science.gov (United States)

    2013-12-06

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0264] Standard Format and Content for a License...), DG-3042, ``Standard Format and Content for a License Application for an Independent Spent Fuel..., Form, and Contents,'' specifies the information that must be in an application for a license to store...

  15. 76 FR 41258 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-07-13

    ... Individual), Gediminas Garmus, Member/Manager. Application Type: New OFF License. World Logistics USA, Inc... at (202) 523-5843 or by e-mail at [email protected] . 3 Plus Logistics Co. dba Touchdown Freight Co. (NVO... Logistics, Inc. (NVO), 3120 Via Mondo, Rancho Dominguez, CA 90220. Officer: Simon Hwang, President/CEO...

  16. Fort Calhoun Station, Unit 2. License application, PSAR, general information

    International Nuclear Information System (INIS)

    1975-09-01

    Application for construction and operating licenses for Calhoun-2 Reactor is presented. Financial data concerning the Omaha Public Power District and the Nebraska Public Power District are included. (DCC)

  17. 78 FR 35634 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-06-13

    ..., Washington, DC 20573, by telephone at (202) 523-5843 or by email at [email protected] . China Interocean Transport.... Taleon, Sole Proprietor (QI). Application Type: New NVO & OFF License. Dulce Auto Import & Export, Inc...), Parque de Granada No. 71, P.H. 504, Huixquilucan, Estado de Mexico 52785 Mexico. Officers: Moises S. Leon...

  18. The regulatory review of construction license application and the supporting safety case

    International Nuclear Information System (INIS)

    Heinonen, Jussi

    2014-01-01

    Finland is one of the foremost countries in the world in developing the disposal of spent fuel. The construction license application for the Olkiluoto spent fuel disposal facility was submitted to the authorities at the end of 2012 and the facility is expected to start operation around 2020. This has been a long-term project with over 30 years of parallel development of the repository project and the regulatory approach to spent fuel management. In 1983 the government made a strategic decision on the objectives and target time schedule for the research, development and technical planning of nuclear waste management. While an export and international disposal solution was still the preferred option, this decision required the licensees without this possibility to prepare for disposal in Finland and it also gave the time line for the milestones on the way to an operating disposal facility by 2020. The licensing procedure for a disposal facility has several steps that are similar to all nuclear facilities in Finland and are defined in Nuclear Energy Act and Decree (1987, 1988). These licensing steps are: - Decision-in-principle is required for a nuclear facility having considerable general significance. This is essentially a political decision: the government decides if the construction project is in line with the overall good of society. The decision can be applied for one or more sites, the host municipality has a veto right and the parliament has the choice of ratifying or not ratifying the decision. - Construction license is granted by the government and authorises the construction of the disposal facility. The actual construction is regulated by STUK and includes several review and approval steps, hold points and viewpoints. - Operational license is granted by the government and authorises the operation of the facility for a certain period. The operational license is needed before nuclear waste can be disposed. The first step in the licensing process was reached

  19. Fuel Receiving and Storage Station. License application, amendment 7

    International Nuclear Information System (INIS)

    1976-02-01

    Amendment No. 7 to Allied-General Nuclear Services application for licensing of the Fuel Receiving and Storage Station consists of revised pages for: Amendment No. 7 to AG-L 105, ''Technical Description in Support of Application for FRSS Operation''; Amendment No. 1 to AG-L 105A, ''Early Operation of the Service Concentrator''; and Amendment No. 2 to AG-L 110, ''FRSS Summary Preoperational Report.''

  20. 76 FR 14395 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-03-16

    ..., Manager/President. Application Type: QI Change. Geoffrey Au dba ABC Logistics Company (NVO), 2250 Gellert... at (202) 523-5843 or by e-mail at [email protected] . Arkman Logistics Inc. (NVO), 1001 Fargo Avenue, Elk... Type: New NVO & OFF License. BCargo Logistics, S.A. de C.V. (NVO), Av. Revolucion 725-A, Col. Jardin...

  1. 78 FR 60282 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-10-01

    ...) pursuant to section 19 of the Shipping Act of 1984 (46 U.S.C. 40101). Notice is also given of the filing of... Castleton Street, Suite 105, City of Industry, CA 91748, Officers: Ya Liu, Deputy General Manager (QI), Jian C. Feng, Director, Application Type: New NVO License, By the Commission. Dated: September 27, 2013...

  2. 76 FR 65193 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-10-20

    ... at (202) 523-5843 or by e-mail at [email protected] . AB Global Logistics Consulting Inc. (OFF), 1010 19th..., Application Type: New NVO License. All Transport Export Inc (NVO & OFF), 4224 Shackleford Road, 3, Norcross... Type: Name Change. CR & J Logistics, Inc. (OFF), 8401 Lake Worth Road, Lake Worth, FL 33467. Officers...

  3. Organisational intelligence and distributed AI

    OpenAIRE

    Kirn, Stefan

    1995-01-01

    The analysis of this chapter starts from organisational theory, and from this it draws conclusions for the design, and possible organisational applications, of Distributed AI systems. We first review how the concept of organisations has emerged from non-organised black-box entities to so-called computerised organisations. Within this context, organisational researchers have started to redesign their models of intelligent organisations with respect to the availability of advanced computing tec...

  4. Environmental Standard Review Plan for the review of license renewal applications for nuclear power plants

    International Nuclear Information System (INIS)

    O'Brien, J.; Kim, T.J.; Reynolds, S.

    1991-08-01

    The Environmental Standard Review Plan for the Review of License Applications for Nuclear Power Plants (ESRP-LR) is to be used by the NRC staff when performing environmental reviews of applications for the renewal of power reactor licenses. The use of the ESRP-LR provides a framework for the staff to determine whether or not environmental issues important to license renewal have been identified and the impacts evaluated and provides acceptance standards to help the reviewers comply with the National Environmental Policy Act

  5. 77 FR 35079 - License Renewal Application for Seabrook Station, Unit 1 ; NextEra Energy Seabrook, LLC

    Science.gov (United States)

    2012-06-12

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-443; NRC-2010-0206] License Renewal Application for Seabrook Station, Unit 1 ; NextEra Energy Seabrook, LLC AGENCY: Nuclear Regulatory Commission. ACTION: License renewal application; intent to prepare supplement to draft [[Page 35080

  6. 75 FR 70350 - Liberty Natural Gas LLC, Liberty Liquefied Natural Gas (LNG) Deepwater Port License Application

    Science.gov (United States)

    2010-11-17

    ... DEPARTMENT OF TRANSPORTATION Maritime Administration [USCG-2010-0993] Liberty Natural Gas LLC, Liberty Liquefied Natural Gas (LNG) Deepwater Port License Application AGENCY: Maritime Administration... announce they have received an application for the licensing of a natural gas deepwater port and the...

  7. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Format and Content. NUREG-1537, Part 1

    International Nuclear Information System (INIS)

    1996-02-01

    NUREG - 1537, Part 1 gives guidance to non-power reactor licensees and applicants on the format and content of applications to the Nuclear Regulatory Commission for licensing actions. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination

  8. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Format and Content. NUREG-1537, Part 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    NUREG - 1537, Part 1 gives guidance to non-power reactor licensees and applicants on the format and content of applications to the Nuclear Regulatory Commission for licensing actions. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

  9. Licensing an assured isolation facility for low-level radioactive waste. Volume 1: Licensing strategy and issues

    International Nuclear Information System (INIS)

    Silverman, D.J.; Bauser, M.A.; Baird, R.D.

    1998-07-01

    This report provides a detailed set of proposed criteria and guidance for the preparation of a license application for an assured isolation facility (AIF). The report is intended to provide a detailed planning basis upon which a prospective applicant may begin pre-licensing discussions with the Nuclear Regulatory Commission and initiate development of a license application. The report may also be useful to the NRC or to state regulatory agencies that may be asked to review such an application. Volume 1 of this report provides background information, and describes the licensing approach and methodology. Volume 2 identifies specific information that is recommended for inclusion in a license application

  10. 77 FR 73054 - Application for a License To Export Radioactive Waste

    Science.gov (United States)

    2012-12-07

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export Radioactive Waste Pursuant to 10 CFR 110.70(b) ``Public Notice of Receipt of an Application,'' please take notice that the Nuclear..., October 25, 2012, XW020, radioactive 1178 pounds disposal by the 11006061. waste in the (approximately...

  11. 76 FR 49462 - Newfound Hydroelectric Company, KTZ Hydro, LLC; Notice of Application for Transfer of License...

    Science.gov (United States)

    2011-08-10

    ... Hydroelectric Company, KTZ Hydro, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On July 25, 2011, Newfound Hydroelectric Company (transferor) and KTZ Hydro, LLC (transferee) filed an application for transfer of license for the Newfound Hydroelectric Project...

  12. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1987-05-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes

  13. 77 FR 14445 - Application for a License To Export Steel Forging

    Science.gov (United States)

    2012-03-09

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export Steel Forging Pursuant to 10 CFR 110.70(b) ``Public Notice of Receipt of an Application,'' please take notice that the Nuclear... head steel February 7, 2012 forging. forging will be XR175 machined into the 11005983 finished vessel...

  14. 9 CFR 2.11 - Denial of initial license application.

    Science.gov (United States)

    2010-01-01

    ... have violated any Federal, State, or local laws or regulations pertaining to animal cruelty within 1... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Denial of initial license application. 2.11 Section 2.11 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT...

  15. Application of coupled codes for safety analysis and licensing issues

    International Nuclear Information System (INIS)

    Langenbuch, S.; Velkov, K.

    2006-01-01

    An overview is given on the development and the advantages of coupled codes which integrate 3D neutron kinetics into thermal-hydraulic system codes. The work performed within GRS by coupling the thermal-hydraulic system code ATHLET and the 3D neutronics code QUABOX/CUBBOX is described as an example. The application of the coupled codes as best-estimate simulation tools for safety analysis is discussed. Some examples from German licensing practices are given which demonstrate how the improved analytical methods of coupled codes have contributed to solve licensing issues related to optimized and more economical use of fuel. (authors)

  16. Licensing requirements for initial commissioning programs in Spain: Application to different PWR designs

    International Nuclear Information System (INIS)

    Munuera, A.; Conde, J.M.; Martinez, J.

    1991-01-01

    This paper describes the overall licensing process in Spain, focusing on the initial commissioning requirements. The significance of this part of the regulatory work is evident both from the licensing and the licensee's points of view. Licensing in Spain is ruled by different laws which determine the general requirements and fix the licensing frame. Being a nuclear technology importer country, the base of the regulatory work lies on the rules and regulations of the country of origin of the planet, with the addition of case specific requirements. The application of this methodology to plants designed in different countries produces licensing processes which are similar to the overall, but very different in its development. It also means a special technical effort on the part of the regulatory body to cope with the problems arising from the use of different technologies and safety standards. The start-up programs from fuel loading to full power of a Westinghouse plant (Vandellos 2) and a Siemens-KWU plant (Trillo 1) are compared from the technical point of view, enhancing the differences that can be relevant for the regulatory work. The difficulties arising from the application of both the German and US concepts are discussed. (orig.)

  17. Licensing an assured isolation facility for low-level radioactive waste. Volume 2: Recommendations on the content and review of an application

    International Nuclear Information System (INIS)

    Silverman, D.J.; Bauser, M.A.; Baird, R.D.

    1998-07-01

    This report provides a detailed set of proposed criteria and guidance for the preparation of a license application for an assured isolation facility (AIF). The report is intended to provide a detailed planning basis upon which a prospective applicant may begin pre-licensing discussions with the Nuclear Regulatory Commission and initiate development of a license application. The report may also be useful to the NRC or to state regulatory agencies that may be asked to review such an application. Volume 1 of this report provides background information, and describes the licensing approach and methodology. Volume 2 identifies specific information that is recommended for inclusion in a license application

  18. Licensing an assured isolation facility for low-level radioactive waste. Volume 2: Recommendations on the content and review of an application

    Energy Technology Data Exchange (ETDEWEB)

    Silverman, D.J.; Bauser, M.A. [Morgan, Lewis and Bockius, Washington, DC (United States); Baird, R.D. [Rogers and Associates Engineering Corp., Salt Lake City, UT (United States)

    1998-07-01

    This report provides a detailed set of proposed criteria and guidance for the preparation of a license application for an assured isolation facility (AIF). The report is intended to provide a detailed planning basis upon which a prospective applicant may begin pre-licensing discussions with the Nuclear Regulatory Commission and initiate development of a license application. The report may also be useful to the NRC or to state regulatory agencies that may be asked to review such an application. Volume 1 of this report provides background information, and describes the licensing approach and methodology. Volume 2 identifies specific information that is recommended for inclusion in a license application.

  19. Fuel Receiving and Storage Station. License application, amendment 4

    International Nuclear Information System (INIS)

    1975-04-01

    Amendment No. 4 of the application for licensing the Barnwell Fuel Processing Plant is presented. Information is included on: the quantity and characteristics of nuclear fuel assemblies which can be received and stored; specifications limiting the outside washdown of contaminated casks received for unloading; and definition of environmental monitoring program. (U.S.)

  20. License renewal process

    International Nuclear Information System (INIS)

    Fable, D.; Prah, M.; Vrankic, K.; Lebegner, J.

    2004-01-01

    The purpose of this paper is to provide information about license renewal process, as defined by Nuclear Regulatory Commission (NRC). The Atomic Energy Act and NRC regulations limit commercial power reactor licenses to an initial 40 years but also permit such licenses to be renewed. This original 40-year term for reactor licenses was based on economic and antitrust considerations not on limitations of nuclear technology. Due to this selected time period; however, some structures and components may have been engineered on the basis of an expected 40-year service life. The NRC has established a timely license renewal process and clear requirements codified in 10 CFR Part 51 and 10 CFR Part 54, that are needed to assure safe plant operation for extended plant life. The timely renewal of licenses for an additional 20 years, where appropriate to renew them, may be important to ensuring an adequate energy supply during the first half of the 21st Century. License renewal rests on the determination that currently operating plants continue to maintain adequate levels of safety, and over the plant's life, this level has been enhanced through maintenance of the licensing bases, with appropriate adjustments to address new information from industry operating experience. Additionally, NRC activities have provided ongoing assurance that the licensing bases will continue to provide an acceptable level of safety. This paper provides additional discussion of license renewal costs, as one of key elements in evaluation of license renewal justifiability. Including structure of costs, approximately value and two different approaches, conservative and typical. Current status and position of Nuclear Power Plant Krsko, related to license renewal process, will be briefly presented in this paper. NPP Krsko is designed based on NRC Regulations, so requirements from 10 CFR 51, and 10 CFR 54, are applicable to NPP Krsko, as well. Finally, this paper will give an overview of current status of

  1. 75 FR 61474 - Juneau Hydropower, Inc.; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2010-10-05

    ... Hydropower, Inc.; Notice of Intent To File License Application, Filing of Pre-Application Document, and....: 13563-001. c. Dated Filed: July 28, 2010. d. Submitted By: Juneau Hydropower, Inc. e. Name of Project... Commission's regulations. h. Potential Applicant Contact: Duff W. Mitchell, Juneau Hydropower, Inc., P.O. Box...

  2. Licensing of ANSTO'S OPAL reactor during construction and commissioning

    International Nuclear Information System (INIS)

    Summerfield, M.W.; Ordonez, J.P.

    2006-01-01

    Full text: This paper presents a general description of the ongoing licensing activities associated with the construction and commissioning of the Australian Nuclear Science and Technology Organisation's (ANSTO) Open Pool Australian Light-water (OPAL) Reactor at their Lucas Heights site. It addresses the following aspects: The Construction Licence - what it is and what impact it had on the construction of the OPAL Reactor, specifically the various Construction Licence Conditions; The interface between ANSTO, INVAP and ARPANSA during the construction of the OPAL Reactor, particularly in relation to ARPANS Regulation 54; Specific licensing issues that have arisen during the construction and commissioning process and how they have been resolved; The Operating Licence Application - what it is and how it interfaces with the construction and commissioning of the OPAL Reactor. These aspects are all addressed from the point of view of the licensee ANSTO and the RRR Project. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and the lessons learnt that may be of benefit to other licensees and regulators. Note that this paper is an update of a presentation given at IGORR10 and follows on from a paper previously presented at PNBC12 in October 2002

  3. Organization and practices on regulatory review in the licensing process of nuclear power plants in Spain

    International Nuclear Information System (INIS)

    Trueba, P.

    1979-01-01

    The actual organisation, practices and experience of the JEN Nuclear Safety Department on the regulatory review in the licensing process of nuclear power plants in Spain, are presented. Topics to be covered are: The structure, organisation, staff and principal functional areas of the NSD, the academic qualifications and work experience of the NSD personnel, recruiting and training, the conduct of the regulatory review during the licensing process and working procedures, the manpower and coverage of the different technical areas, the principal problems and conclusions. (author)

  4. Application and licensing requirements of the Framatome ANP RLBLOCA methodology

    International Nuclear Information System (INIS)

    Martin, R.P.; Dunn, B.M.

    2004-01-01

    The Framatome ANP Realistic Large-Break LOCA methodology (FANP RLBLOCA) is an analysis approach approved by the US NRC for supporting the licensing basis of 3- and 4-loop Westinghouse PWRs and CE 2x4 PWRs. It was developed consistent with the NRC's Code Scaling, Applicability, and Uncertainty (CSAU) methodology for performing best-estimate large-break LOCAs. The CSAU methodology consists of three key elements with the second and third element addressing uncertainty identification and application. Unique to the CSAU methodology is the use of engineering judgment and the Process Identification and Ranking Table (PIRT) defined in the first element to lay the groundwork for achieving the ultimate goal of quantifying the total uncertainty in predicted measures of interest associated with the large-break LOCA. It is the PIRT that not only directs the methodology development, but also directs the methodology review. While the FANP RLBLOCA methodology was generically approved, a plant-specific application is customized in two ways addressing how the unique plant characterization 1) is translated to code input and 2) relates to the unique methodology licensing requirements. Related to the former, plants are required by 10 CFR 50.36 to define a technical specification limiting condition for operation based on the following criteria: 1. Installed instrumentation that is used in the control room to detect, and indicate, a significant abnormal degradation of the reactor coolant pressure boundary. 2. A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. 3. A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a

  5. The law of international organisations

    CERN Document Server

    White, Nigel D

    2017-01-01

    This book provides a concise account of the principles and norms of international law applicable to the main-type of international organisation - the inter-governmental organisation (IGO). That law consists of principles and rules found in the founding documents of IGOs along with applicable principles and rules of international law. The book also identifies and analyses the law produced by IGOs, applied by them and, occasionally, enforced by them. There is a concentration upon the United Nations, as the paradigmatic IGO, not only upon the UN organisation headquartered in New York, but on other IGOs in the UN system (the specialised agencies such as the World Health Organisation).

  6. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1983-10-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  7. Pesticide Applicator Profiling: Using Polycom[R] Distance Delivery for Continuing Education and Characterizing Florida's Licensed Applicators

    Science.gov (United States)

    Fishel, Fred; Langeland, Ken

    2011-01-01

    The University of Florida offers continuing education units (CEUs) via distance technology using Polycom[R] to meet requirements for applicators of pesticides to renew their licenses. A large statewide event conducted in 2010 also included a needs assessment of this group concerning CEUs. Results indicate that these applicators strongly prefer…

  8. Guide for the preparation of applications for licenses for the use of sealed sources in portable gauging devices

    International Nuclear Information System (INIS)

    1985-01-01

    The purpose of this regulatory guide is to provide assistance to applicants and licensees in preparing applications for new licenses, license amendments, and license renewals for the use of sealed sources in portable gauging devices. An example of a portable gauging device is a moisture-density gauge that contains a gamma-emitting sealed source, cesium-137, and a sealed neutron source, americium-242-beryllium

  9. Streamlining the license renewal review process

    International Nuclear Information System (INIS)

    Dozier, J.; Lee, S.; Kuo, P.T.

    2001-01-01

    The staff of the NRC has been developing three regulatory guidance documents for license renewal: the Generic Aging Lessons Learned (GALL) report, Standard Review Plan for License Renewal (SRP-LR), and Regulatory Guide (RG) for Standard Format and Content for Applications to Renew Nuclear Power Plant Operating Licenses. These documents are designed to streamline the license renewal review process by providing clear guidance for license renewal applicants and the NRC staff in preparing and reviewing license renewal applications. The GALL report systematically catalogs aging effects on structures and components; identifies the relevant existing plant programs; and evaluates the existing programs against the attributes considered necessary for an aging management program to be acceptable for license renewal. The GALL report also provides guidance for the augmentation of existing plant programs for license renewal. The revised SRP-LR allows an applicant to reference the GALL report to preclude further NRC staff evaluation if the plant's existing programs meet the criteria described in the GALL report. During the review process, the NRC staff will focus primarily on existing programs that should be augmented or new programs developed specifically for license renewal. The Regulatory Guide is expected to endorse the Nuclear Energy Institute (NEI) guideline, NEI 95-10, Revision 2, entitled 'Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule', which provides guidance for preparing a license renewal application. This paper will provide an introduction to the GALL report, SRP-LR, Regulatory Guide, and NEI 95-10 to show how these documents are interrelated and how they will be used to streamline the license renewal review process. This topic will be of interest to domestic power utilities considering license renewal and international ICONE participants seeking state-of-the-art information about license renewal in the United States

  10. 75 FR 15743 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2010-03-30

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export High-Enriched Uranium Pursuant to 10 CFR 110.70(c) ``Public notice of receipt of an application,'' please take notice that the...-Enriched 160.0 kilograms To fabricate fuel France. Complex, March 3, 2010. Uranium (93.35%). uranium (149...

  11. 75 FR 6223 - Application For a License To Export High-Enriched Uranium

    Science.gov (United States)

    2010-02-08

    ... NUCLEAR REGULATORY COMMISSION Application For a License To Export High-Enriched Uranium Pursuant to 10 CFR 110.70(c) ``Public notice of receipt of an application,'' please take notice that the..., Uranium (93.35%). uranium (16.3 targets for December 28, 2009, XSNM3623, kilograms U-235). irradiation in...

  12. 77 FR 1956 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2012-01-12

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export High-Enriched Uranium Pursuant to 10 CFR 110.70(b) ``Public Notice of Receipt of an Application,'' please take notice that the.... Security Complex. Uranium uranium (9.3 targets at December 21, 2011 (93.35%). kilograms U- CERCA AREVA...

  13. 75 FR 7525 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2010-02-19

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export High-Enriched Uranium Pursuant to 10 CFR 110.70(c) ``Public notice of receipt of an application,'' please take notice that the..., February 2, Uranium (93.35%). uranium (87.3 elements in 2010, February 2, 2010, kilograms U-235). France...

  14. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1993-01-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes

  15. [Evaluation of Web-based software applications for administrating and organising an ophthalmological clinical trial site].

    Science.gov (United States)

    Kortüm, K; Reznicek, L; Leicht, S; Ulbig, M; Wolf, A

    2013-07-01

    The importance and complexity of clinical trials is continuously increasing, especially in innovative specialties like ophthalmology. Therefore an efficient clinical trial site organisational structure is essential. In modern internet times, this can be accomplished by web-based applications. In total, 3 software applications (Vibe on Prem, Sharepoint and open source software) were evaluated in a clinical trial site in ophthalmology. Assessment criteria were set; they were: reliability, easiness of administration, usability, scheduling, task list, knowledge management, operating costs and worldwide availability. Vibe on Prem customised by the local university met the assessment criteria best. Other applications were not as strong. By introducing a web-based application for administrating and organising an ophthalmological trial site, studies can be conducted in a more efficient and reliable manner. Georg Thieme Verlag KG Stuttgart · New York.

  16. 77 FR 6552 - Mahoning Hydropower, LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2012-02-08

    ... Hydropower, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and...: December 7, 2011. d. Submitted By: Mahoning Hydropower, LLC. e. Name of Project: Berlin Lake Hydroelectric... Hydropower, LLC, 11365 Normandy Lane, Chagrin Falls, OH 44023; (440) 804-6627; [email protected] i. FERC...

  17. Preparing to review the license application of the French geological disposal facility - Issues, challenges and perspectives

    International Nuclear Information System (INIS)

    Dandrieux, Geraldine

    2014-01-01

    This paper briefly describes the French context for GDR authorization, the French dedicated legislative framework (28 June 2006 Act on sustainable management of radioactive materials and waste), the challenges (regulatory issues, long-term project supervision, technical issues, procedural issues), and the preparing for the review of the DGR license application. A planning schedule is propose with Andra to submit license application for DGR in 2015

  18. Information to be submitted in support of licensing applications for nuclear power plants

    International Nuclear Information System (INIS)

    1979-01-01

    This Safety Guide was prepared as part of the Agency's programme, referred to as the NUSS programme, for establishing Codes of Practice and Safety Guides relating to nuclear power plants. It supplements the Agency's Safety Series No.50-C-G, entitled ''Governmental Organization for the Regulation of Nuclear Power Plants: A Code of Practice''. It is concerned with the content of documents which should be submitted to the regulatory body by the applicant/licensee in support of licensing applications, with a possible method of classifying these documents and with the scheduling of their submission to the regulatory body at each major stage of the licensing process

  19. A comparison of the pathological, clinical and radiographical, features of cryptogenic organising pneumonia, acute fibrinous and organising pneumonia and granulomatous organising pneumonia.

    Science.gov (United States)

    Feinstein, Marc B; DeSouza, Shilpa A; Moreira, Andre L; Stover, Diane E; Heelan, Robert T; Iyriboz, Tunç A; Taur, Ying; Travis, William D

    2015-06-01

    Cryptogenic organising pneumonia (COP) and acute fibrinous and organising pneumonia (AFOP) are recognised patterns of organising pneumonia (OP), a condition that resembles pneumonia but is not caused by infection. We have recognised granulomatous organising pneumonia (GOP) to be a similar histopathological entity where non-necrotising granulomata are intimately associated with the organising connective tissue. To what degree COP, AFOP and GOP represent distinct clinical and pathological disorders is unknown. This cross-sectional study sought to compare the pathological, clinical, and radiographical features of these OP patterns. Surgical lung biopsy specimens were reviewed for consecutive patients referred with OP to a metropolitan cancer centre. Clinical information and CT images were acquired from the hospital electronic medical record to determine the clinical and CT characteristics of each OP pattern. Sixty-one patients (35 men, 26 women), mean age 61.5 years (range 8-85 years), were available for analysis. Of these, 43 patients (70%) had at least one prior cancer; 27 (44%) had received chemotherapy and 18 (30%) had received radiation. Approximately, half (32 patients) had respiratory symptoms, most commonly cough, dyspnoea and/or wheezing. While symptoms and mortality rates were not different among OP groups, AFOP patients more commonly had fever (p=0.04). GOP patients less commonly had received chemotherapy (p=0.03) and were more likely to present as masses/nodules (p=0.04). AFOP and GOP, a newly described OP form, possess clinical and pathological findings that set it apart from a COP, suggesting an emerging spectrum of OP. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  20. 77 FR 21592 - Guidelines for Preparing and Reviewing Licensing Applications for the Production of Radioisotopes

    Science.gov (United States)

    2012-04-10

    ... Licensing of Non-Power Reactors: Format and Content,'' for the production of radioisotopes and NUREG-1537, Part 2, ``Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors... by searching on http://www.regulations.gov under Docket ID NRC-2011-0135. You may submit comments by...

  1. Product Life Cycle concept use and application by marketing decision-makers in small South African organisations

    Directory of Open Access Journals (Sweden)

    F. J. Herbst

    2003-12-01

    Full Text Available The purpose of the study was to test the underlying theory of the product life cycle concept with the primary objective of establishing what the use and practical value of the product life cycle concept is in making marketing decisions in small manufacturing and dealer organisations in Gauteng. The main focus was to test the ability of marketing decision-makers in these small organisations to associate their application and use of the product life cycle concept with Kotler's assumptions on marketing characteristics, described marketing objectives and proposed marketing strategies. A major finding was that small organisations tended to display a marketing knowledge level with the existing marketing theory. Another important conclusion of the study was that the current product life cycle concept theory needs to be broadened to include strategies on the expanded marketing mix. Apart from the different use and application by marketing decision-makers in small organisations in South Africa the product life cycle concept theory has potential as a strategic tool and a high likelihood for its future use as a marketing decision-making instrument.

  2. Organisational support, organisational identification and organisational citizenship behaviour among male nurses.

    Science.gov (United States)

    Chen, Sheng-Hwang; Yu, Hsing-Yi; Hsu, Hsiu-Yueh; Lin, Fang-Chen; Lou, Jiunn-Horng

    2013-11-01

    The purpose of this study was to explore the relationship between organisational support, organisational identification, and organisational citizenship behaviour and the predictors of organisational citizenship behaviour in Taiwanese male nurses. The turnover rate among male nurses is twice that of female nurses. Organisational citizenship behaviour is the predictor of turnover intention. Little information is available on the relationship between organisational support, organisational identification and organisational citizenship behaviour, particularly for male nurses. Data were collected in 2010 from a questionnaire mailed to 167 male nurses in Taiwan. A cross-sectional survey with simple sampling was used in this study. The results showed that organisational identification and organisational support were correlated with organisational citizenship behaviour. Organisational distinctiveness, organisational support of work conditions and the type of organisation were the main predictors of organisational citizenship behaviour. Together they accounted for 40.7% of the total variation in organisational citizenship behaviour. Organisational distinctiveness was the most critical predictor, accounting for 29.6% of the variation. Organisational support and organisational identification have positive relationships with organisational behaviour. Organisational distinctiveness is an important factor in explaining organisational citizenship behaviour in male nurses. This finding provides concrete directions for managers to follow when providing organisational identification, in particular, the organisational distinctiveness will help male nurses to display increasingly more organisational citizenship behaviour. © 2012 John Wiley & Sons Ltd.

  3. Virtual corporations, enterprise and organisation

    Directory of Open Access Journals (Sweden)

    Carmen RÃDUT

    2009-06-01

    Full Text Available Virtual organisation is a strategic paradigm that is centred on the use of information and ICT to create value. Virtual organisation is presented as a metamanagement strategy that has application in all value oriented organisations. Within the concept of Virtual organisation, the business model is an ICT based construct that bridges and integrates enterprise strategic and operational concerns. Firms try to ameliorate the impacts of risk and product complexity by forming alliances and partnerships with others to spread the risk of new products and new ventures and to increase organisational competence. The result is a networked virtual organization.

  4. 78 FR 45578 - Application For a License to Export Radioactive Waste

    Science.gov (United States)

    2013-07-29

    ... NUCLEAR REGULATORY COMMISSION Application For a License to Export Radioactive Waste Pursuant to 10..., 2013, radioactive waste authorized for disposal by the XW021, 11006101. as contaminated export will not original secondary waste exceed quantities generators, as resulting from imported in required or the...

  5. 76 FR 52994 - Application for a License To Export Heavy Water

    Science.gov (United States)

    2011-08-24

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export Heavy Water Pursuant to 10 CFR... (liters). producing an active water). pharmaceutical ingredient known as CTP-499, which incorporates heavy water as the source of deuterium to achieve the hydrogen-deuterium exchange. November 30, 2010 December...

  6. Analysing organisational context: case studies on the contribution of absorptive capacity theory to understanding inter-organisational variation in performance improvement.

    Science.gov (United States)

    Harvey, Gill; Jas, Pauline; Walshe, Kieran

    2015-01-01

    Organisational context is frequently cited as an important consideration when implementing and evaluating quality improvement interventions in healthcare, but limited guidance is available on which aspects of context are most influential or modifiable. This paper examines how internal and external contextual factors mediate organisational-level performance improvement through applying the knowledge-based theory of absorptive capacity (AC). Three healthcare case studies are presented. Each case is a UK National Health Service organisation that had been identified as having performance problems. Qualitative data were collected through semi-structured interviews with general and clinical managers within the organisation and members of external teams supporting or overseeing performance improvement (n=22). Interview data were analysed using an existing AC framework from the literature. The organisation with the highest AC showed the quickest and most comprehensive performance improvement. Internal characteristics including strategic priorities, processes for managing information, communication and orientation to learning and development impacted on the organisation's ability to engage successfully with external stakeholders and make use of available knowledge. This enabled the organisation to thrive despite the challenging external environment. Lower levels of AC appeared to delay or limit the improvement trajectory. Developing a more detailed and nuanced understanding of how context influences improvement is an important step towards achieving more effective and sustainable quality improvement programmes in healthcare. AC, with its focus on knowledge and organisational learning, provides a useful way to explore the relationship between context and quality improvement and represents a potentially valuable area for future research and development. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go

  7. 77 FR 34030 - BOST1 Hydroelectric LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2012-06-08

    ... Hydroelectric LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and.... Date Filed: March 21, 2012. d. Submitted By: BOST1 Hydroelectric LLC (BOST1). e. Name of Project: Coon Rapids Dam Hydroelectric Project. f. Location: Mississippi River in Hennepin and Anoka counties...

  8. Do US Medical Licensing Applications Treat Mental and Physical Illness Equivalently?

    Science.gov (United States)

    Gold, Katherine J; Shih, Elizabeth R; Goldman, Edward B; Schwenk, Thomas L

    2017-06-01

    State medical licensing boards are responsible for evaluating physician impairment. Given the stigma generated by mental health issues among physicians and in the medical training culture, we were interested in whether states asked about mental and physical health conditions differently and whether questions focused on current impairment. Two authors reviewed physician medical licensing applications for US physicians seeking first-time licensing in 2013 in the 50 states and the District of Columbia. Questions about physical and mental health, as well as substance abuse, were identified and coded as to whether or not they asked about diagnosis and/or treatment or limited the questions to conditions causing physician impairment. Forty-three (84%) states asked questions about mental health conditions, 43 (84%) about physical health conditions, and 47 (92%) about substance use. States were more likely to ask for history of treatment and prior hospitalization for mental health and substance use, compared with physical health disorders. Among states asking about mental health, just 23 (53%) limited all questions to disorders causing functional impairment and just 6 (14%) limited to current problems. While most state medical licensing boards ask about mental health conditions or treatment, only half limited queries to disorders causing impairment. Differences in how state licensing boards assess mental health raise important ethical and legal questions about assessing physician ability to practice and may discourage treatment for physicians who might otherwise benefit from appropriate care.

  9. NUPLEX Licensing Subcommittee

    International Nuclear Information System (INIS)

    Edwards, D.W.; Allen, S.R.

    1988-01-01

    The NUPLEX Licensing Subcommittee was organized to seek a formal license renewal mechanism that institutionalizes the current licensing basis and consequent level of safety of a plant as the legitimate standard for acceptance and approval of an application for extended operation. Along with defining the most workable approach to and scope of review for license renewal, this paper explains the reasons why a regulatory framework is needed by the early 1990s. The initial results of development work on two key issues, licensing criteria and hearing process, are also presented. at this point six potential license renewal criteria have emerged: evaluation of existing monitoring/maintenance programs, revalidation of current licensing basis, conformance to special regulations, evaluation to a safety goal, plant performance history, and environmental assessment. The work on a hearing process has led to the development of two models for future consideration: hybrid legislative and hybrid adjudicatory

  10. Safety evaluation review of the prototype license application safety analysis report

    International Nuclear Information System (INIS)

    1991-08-01

    The US Nuclear Regulatory Commission (NRC) staff and consultants reviewed a Prototype License Application Safety Analysis Report (PLASAR) submitted by the US Department of Energy (DOE) for the belowground vault (BGV) alternative method of low-level radioactive waste disposal. In Volume 1 of NUREG-1375, the NRC staff provided the safety review results for an earth-mounded concrete bunker PLASAR. In the current report, the staff focused its review on the design, construction, and operational aspects of the BGV PLASAR. The staff developed review comments and questions using the Standard Review Plan (SRP), Rev. 1 (NUREG-1200) as the basis for evaluating the acceptability of the information provided in the BGV PLASAR. The detailed review comments provided in this report are intended to be useful guidance to facility developers and State regulators in addressing issues likely to be encountered in the review of a license application for a low-level-waste disposal facility. 44 refs

  11. Harmonisation of licensing processes for decommissioning. Options and limitations; Genehmigungsverfahren fuer die Stilllegung der deutschen Kernkraftwerke. Konvoi oder Kakophonie?

    Energy Technology Data Exchange (ETDEWEB)

    Raetzke, Christian

    2016-03-15

    The shutdown of eight reactors in Germany in the wake of Fukushima 2011 and the scheduled phase-out of the remaining units in several steps ending 2022 has obviously triggered a wave of applications for decommissioning and dismantling licences. It would seem natural to strive for a harmonised handling of these processes, analogous to the 'convoi' concept which was successfully employed for licensing and construction of the three most recent German NPPs in the 1980s. However, a comparative analysis shows that the motivation of all players is much different from that of earlier times and that harmonisation of licensing processes for dismantling is not as crucial for operators, authorities and technical support organisations as it was for construction.

  12. [Radiation protection in medical research : Licensing requirement for the use of radiation and advice for the application procedure].

    Science.gov (United States)

    Minkov, V; Klammer, H; Brix, G

    2017-07-01

    In Germany, persons who are to be exposed to radiation for medical research purposes are protected by a licensing requirement. However, there are considerable uncertainties on the part of the applicants as to whether licensing by the competent Federal Office for Radiation Protection is necessary, and regarding the choice of application procedure. The article provides explanatory notes and practical assistance for applicants and an outlook on the forthcoming new regulations concerning the law on radiation protection of persons in the field of medical research. Questions and typical mistakes in the application process were identified and evaluated. The qualified physicians involved in a study are responsible for deciding whether a license is required for the intended application of radiation. The decision can be guided by answering the key question whether the study participants would undergo the same exposures regarding type and extent if they had not taken part in the study. When physicians are still unsure about their decision, they can seek the advisory service provided by the professional medical societies. Certain groups of people are particularly protected through the prohibition or restriction of radiation exposure. A simplified licensing procedure is used for a proportion of diagnostic procedures involving radiation when all related requirements are met; otherwise, the regular licensing procedure should be used. The new radiation protection law, which will enter into force on the 31st of december 2018, provides a notification procedure in addition to deadlines for both the notification and the licensing procedures. In the article, the authors consider how eligible studies involving applications of radiation that are legally not admissible at present may be feasible in the future, while still ensuring a high protection level for study participants.

  13. The post-closure radiological safety case for a spent fuel repository in Sweden - An international peer review of the SKB license-application study of March 2011

    International Nuclear Information System (INIS)

    2012-01-01

    Sweden is at the forefront among countries developing plans for a deep geological repository of highly radioactive waste. There is no such repository in operation yet worldwide, but Sweden, Finland and France are approaching the licensing stage. At the request of the Swedish government, the NEA organised an international peer review of the post-closure radiological safety case produced by the Swedish Nuclear Fuel and Waste Management Company (SKB) in support of the application for a general licence to construct and operate a spent nuclear fuel geological repository in the municipality of Oesthammar. The purpose of the review was to help the Swedish government, the public and relevant organisations by providing an international reference regarding the maturity of SKB's spent fuel disposal programme vis-a-vis best practices in long-term disposal safety and radiological protection. The International Review Team (IRT) consisted of ten international specialists, who were free of conflict of interest with the SKB and brought complementary expertise to the review. This report provides the background and findings of the international peer review. The review's findings are presented at several levels of detail in order to be accessible to both specialist and non-specialist readers

  14. Introducing organisational heritage: Linking corporate heritage, organisational identity, and organisational memory

    OpenAIRE

    Balmer, JMT; Burghausen, M

    2015-01-01

    In this article we formally introduce and explicate the organisational heritage notion. The authors conclude organisational heritage can be designated in three broad ways as: (1) organisational heritage identity as the perceived and reminisced omni-temporal traits – both formal/normative and utilitarian/societal – of organisational members’ work organisation; (2) organisational heritage identification as organisational members’ identification/self-categorisation vis-à-vis these perceived and ...

  15. 18 CFR 131.20 - Application for approval of transfer of license.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Application for approval of transfer of license. 131.20 Section 131.20 Conservation of Power and Water Resources FEDERAL... a citizen of the United States of America. Subscribed and sworn to before me, a notary public of the...

  16. Regulatory systems-based licensing guidance documentation

    International Nuclear Information System (INIS)

    Delligatti, M.S.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) has developed a series of licensing guidance documents based on the regulatory requirements in Part 60 of Title 10 of the Code of Federal Regulations (10 CFR Part 60). This regulatory systems-based approach to licensing guidance documentation relies on the definition of the high-level waste repository in 10 CFR Part 60. A document which is important for the frame-work it gives to other programmatic licensing guidance is the Draft Regulatory Guide open-quotes Format and Content for the License Application for the High-Level Waste Repositoryclose quotes (FCRG). The FCRG describes a format and content acceptable to NRC for a high-level waste repository license application pursuant to the requirements of 10 CFR Part 60. Other licensing guidance documents will be compatible with the FCRG

  17. 22 CFR 96.30 - State licensing.

    Science.gov (United States)

    2010-04-01

    ... Licensing and Corporate Governance § 96.30 State licensing. (a) The agency or person is properly licensed or... person follows applicable State licensing and regulatory requirements in all jurisdictions in which it provides adoption services. (c) If it provides adoption services in a State in which it is not itself...

  18. LTO License Application Project NPP Borssele

    International Nuclear Information System (INIS)

    Jong, A.E. de; Blom, F.J.; Leilich, J.

    2012-01-01

    Borssele NPP plans to extend its operating life with 20 years until 2034. Borssele has started the project LTO 'bewijsvoering' (LTO 'Justification') in order to meet the requirements of the Dutch regulator. The outline of the project is based on IAEA safety guide 57 'Safe Long Term Operation of Nuclear Power Plants'. This paper describes the contents and coherence of the different parts in the project and how these respond to the IAEA guidelines on LTO. The goal of the project LTO 'bewijsvoering' is to ensure that safety and safety relevant systems, structures and components continue to perform their intended functions during long term operation. The outcome of the project LTO 'bewijsvoering' will be used for a license change application and this will be submitted to the Dutch regulator KFD for approval of prolonged operation of Borssele NPP after 2013. (author)

  19. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Standard review plan and acceptance criteria. NUREG - 1537, Part 2

    International Nuclear Information System (INIS)

    1996-02-01

    NUREG - 1537, Part 2 gives guidance on the conduct of licensing action reviews to NRC staff who review non-power reactor licensing applications. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination

  20. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Standard review plan and acceptance criteria. NUREG - 1537, Part 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    NUREG - 1537, Part 2 gives guidance on the conduct of licensing action reviews to NRC staff who review non-power reactor licensing applications. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

  1. 77 FR 76483 - Ocean Transportation Intermediary License Applicants The Commission gives notice that the...

    Science.gov (United States)

    2012-12-28

    ... Transport Co., PAC International Logistics Company, & Book Express Network. Stealth Logistics LLC (NVO & OFF.... Application Type: QI Change. Efrinsa Global Logistics Inc. (NVO & OFF), 8441 NW 68th Street, Miami, FL 33166... (QI), Sheila E. Lawrence, President. Application Type: New OFF License. MMC Logistics, LLC (OFF), 2853...

  2. Preparing as an organization to review a construction license application for a DGR for HLW and SF in the USA

    International Nuclear Information System (INIS)

    Hill, Brittain

    2014-01-01

    Although formally opposed by the State of Nevada, the Yucca Mountain site (Nevada) recommendation was approved by the U.S. Congress and the President, which authorized DOE to prepare and submit a license application for a deep geologic repository for the nation's spent nuclear fuel and high-level waste. In June of 2008, DOE submitted this application to the U.S. Nuclear Regulatory Commission (NRC) for its review and formal adjudication of contested issues during a 3-4 year period. Although subsequent actions by the Administration and Congress have changed the direction for geologic disposal in the U.S., the NRC staff was able to conduct a thorough technical review of the DOE license application and issue technical evaluation reports before the review and hearings were suspended in September 2011. This paper provides the author's perspective on how the NRC prepared for, and conducted, this first-of-a-kind licensing review: planning framework, key preparations for staff and for processes, events after the receipt of a license application, retrospective on staff preparations and on processes. By the end of September 2011, the NRC staff had issued three Technical Evaluation Reports using a risk-informed, performance-based approach to review the DOE license application for this deep geologic repository at Yucca Mountain

  3. 78 FR 33448 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2013-06-04

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export High-Enriched Uranium Pursuant.... Security Complex, May 13, Uranium (93.35%). uranium-235 at the National 2013, May 21, 2013, XSNM3745, contained in 7.5 Research Universal 11006098. kilograms reactor in Canada for uranium. ultimate use in...

  4. 77 FR 12830 - Pershing County Water Conservation District; Notice of Intent To File License Application, Filing...

    Science.gov (United States)

    2012-03-02

    ... Water Conservation District; Notice of Intent To File License Application, Filing of Pre-Application.... Submitted by: Pershing County Water Conservation District (Pershing County). e. Name of Project: Humboldt... the Commission's regulations. h. Potential Applicant Contact: Bennie Hodges, Pershing County Water...

  5. Use of annotated outlines to prepare guidance for license applications for the MRS and MGDS

    International Nuclear Information System (INIS)

    Roberts, J.; Griffin, W.R.

    1992-01-01

    This paper reports that the Office of Civilian Radioactive Waste Management (OCRWM) has embarked on an aggressive program to develop guidance for preparation of the License Applications for the Mined Geological Disposal System (MGDS) and Monitored Retrievable Storage (MRS). The endeavor is a team effort that will utilize personnel and funding from the Office of Systems and Compliance at DOE Headquarters, the MRS Project (i.e., DOE Office of Storage and Transportation) and the Yucca Mountain Project (i.e., DOE Office of Geologic Disposal). The endeavor was initiated in the Spring of 1991. It will continue via an iterative process until License Applications are completed for the MRS and MGDS projects

  6. 77 FR 73056 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2012-12-07

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export High-Enriched Uranium Pursuant... Complex. Uranium (93.2%). uranium-235 at CERCA AREVA Romans October 10, 2012 contained in 6.2 in France and to October 12, 2012 kilograms irradiate targets at XSNM3729 uranium. the BR-2 Research 11006053...

  7. 77 FR 73055 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2012-12-07

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export High-Enriched Uranium Pursuant.... Security Complex. Uranium uranium-235 at CERCA AREVA October 10, 2012 (93.35%). contained in Romans in France October 12, 2012 10.1 kilograms and to irradiate XSNM3730 uranium. targets at the HFR 11006054...

  8. 77 FR 51579 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2012-08-24

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export High-Enriched Uranium Pursuant.... Complex, July 30, 2012, August Uranium (93.35%). uranium-235 high-enriched 1, 2012, XSNM3726, 11006037. contained in 7.5 uranium in the kilograms uranium. form of broken metal to the Atomic Energy of Canada...

  9. 77 FR 74841 - Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2012-12-18

    ... patrons who access the restaurant by boat. l. Locations of the Application: A copy of the application is... Company; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is...

  10. The United States nuclear regulatory commission license renewal process

    International Nuclear Information System (INIS)

    Holian, B.E.

    2009-01-01

    The United States (U.S.) Nuclear Regulatory Commission (NRC) license renewal process establishes the technical and administrative requirements for the renewal of operating power plant licenses. Reactor ope-rating licenses were originally issued for 40 years and are allowed to be renewed. The review process for license renewal applications (L.R.A.) provides continued assurance that the level of safety provided by an applicant's current licensing basis is maintained for the period of extended operation. The license renewal review focuses on passive, long-lived structures and components of the plant that are subject to the effects of aging. The applicant must demonstrate that programs are in place to manage those aging effects. The review also verifies that analyses based on the current operating term have been evaluated and shown to be valid for the period of extended operation. The NRC has renewed the licenses for 52 reactors at 30 plant sites. Each applicant requested, and was granted, an extension of 20 years. Applications to renew the licenses of 20 additional reactors at 13 plant sites are under review. As license renewal is voluntary, the decision to seek license renewal and the timing of the application is made by the licensee. However, the NRC expects that, over time, essentially all U.S. operating reactors will request license renewal. In 2009, the U.S. has 4 plants that enter their 41. year of ope-ration. The U.S. Nuclear Industry has expressed interest in 'life beyond 60', that is, requesting approval of a second renewal period. U.S. regulations allow for subsequent license renewals. The NRC is working with the U.S. Department of Energy (DOE) on research related to light water reactor sustainability. (author)

  11. Towards an organisation-wide process-oriented organisation of care: A literature review

    Directory of Open Access Journals (Sweden)

    Groenewegen Peter P

    2011-01-01

    Full Text Available Abstract Background Many hospitals have taken actions to make care delivery for specific patient groups more process-oriented, but struggle with the question how to deal with process orientation at hospital level. The aim of this study is to report and discuss the experiences of hospitals with implementing process-oriented organisation designs in order to derive lessons for future transitions and research. Methods A literature review of English language articles on organisation-wide process-oriented redesigns, published between January 1998 and May 2009, was performed. Results Of 329 abstracts identified, 10 articles were included in the study. These articles described process-oriented redesigns of five hospitals. Four hospitals tried to become process-oriented by the implementation of coordination measures, and one by organisational restructuring. The adoption of the coordination mechanism approach was particularly constrained by the functional structure of hospitals. Other factors that hampered the redesigns in general were the limited applicability of and unfamiliarity with process improvement techniques. Conclusions Due to the limitations of the evidence, it is not known which approach, implementation of coordination measures or organisational restructuring (with additional coordination measures, produces the best results in which situation. Therefore, more research is needed. For this research, the use of qualitative methods in addition to quantitative measures is recommended to contribute to a better understanding of preconditions and contingencies for an effective application of approaches to become process-oriented. Hospitals are advised to take the factors for failure described into account and to take suitable actions to counteract these obstacles on their way to become process-oriented organisations.

  12. 75 FR 71102 - White Mountain Hydroelectric Corp.; Notice of Application for Amendment of License, and...

    Science.gov (United States)

    2010-11-22

    ... Hydroelectric Corp.; Notice of Application for Amendment of License, and Soliciting Comments, Motions To Intervene, and Protests November 12, 2010. Take notice that the following hydroelectric application has been... Hydroelectric Corp. e. Name of Project: Apthorp Hydroelectric Project. f. Location: The project is located on...

  13. UK regulatory expectations for the development of licensee organisational capability

    International Nuclear Information System (INIS)

    Gibson, S.; Reiersen, Craig

    2011-01-01

    The Nuclear Installations Inspectorate (NII) is responsible for the licensing and regulatory oversight of new nuclear power reactors in the UK. NII recognises that effective licensee leadership and management for safety are instrumental in the safety of new and existing nuclear installations. NII is consequently placing considerable emphasis on seeking assurance that prospective licensees develop an adequate organisational capability to manage and deliver nuclear safety in addition to constructing a design that has passed through a rigorous assessment process. In order to make NII's expectations clear, and support a consistent approach to interactions with prospective licensees, NII has produced a suite of related guidance to help its Inspectors assess and influence the development of licensee organisational capability. This includes: 1. The safety management prospectus; 2. The 'nuclear baseline'; 3. Intelligent Customer capability and use of contractors; 4. Design Authority; 5. Licence Condition Compliance Arrangements; 6. Development of Organisational Capability

  14. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes. Revision 7 was published in January 1993 and became effective in August 1993. Supplement 1 is being issued primarily to implement administrative changes to the requalification examination program resulting from the amendment to 10 CFR 55 that eliminated the requirement for every licensed operator to pass an NRC-conducted requalification examination as a condition for license renewal. The supplement does not substantially alter either the initial or requalification examination processes and will become effective 30 days after its publication is noticed in the Federal Register. The corporate notification letters issued after the effective date will provide facility licensees with at least 90 days notice that the examinations will be administered in accordance with the revised procedures

  15. Licensing issues

    International Nuclear Information System (INIS)

    Roberts, J.P.; Desell, L.J.; Birch, M.L.; Berkowitz, L.; Bader, J.F.

    1992-01-01

    To provide guidance for the Department of Energy's (DOE) Civilian Radioactive Waste Management Program, the Nuclear Regulatory Commission (NRC) has issued a draft regulatory guide on the Format and Content for the License Application for the High-Level Waste Repository (FCRG). To facilitate the development of the FCRG, NRC suggested that DOE use the draft guide as the basis for preparing an annotated outline for a license application. DOE is doing so using an iterative process called the Annotated Outline Initiative. DOE;s use of the Initiative will assist in achieving the desired incorporation of actual experience in the FCRG, contribute to the development of shared interpretation and understanding of NRC regulations, and provide other important programmatic benefits described in this paper

  16. DOE Patents Available for Licensing

    International Nuclear Information System (INIS)

    Stuber, C.

    1981-01-01

    DOE Patents Available for Licensing (DOE PAL) provides abstracting and indexing coverage of the DOE patent literature, including patent applications, that concerns any apsect of energy production, conservation, and utilization. The citations are arranged by subject category. DOE is prepared to grant exclusive or nonexclusive, revocable licenses under DOE-owned US patents and patent applications in accordance with the provisions of 10CFR781

  17. NUMARC view of license renewal criteria

    International Nuclear Information System (INIS)

    Edwards, D.W.

    1989-01-01

    The Atomic Energy Act and the implementing regulations of the US Nuclear Regulatory Commission (NRC) permit the renewal of nuclear plant operating licenses upon expiration of their 40-year license term. However, the regulatory process by which license renewal may be accomplished and the requirements for the scope and content of renewal applications are yet to be established. On August 29, 1988, the NRC published an Advanced Notice of Proposed Rulemaking regarding the subject of license renewal. This Advanced Notice and the NUREG which it references, NUREG-1317, Regulatory Options for Nuclear Plant License Renewal, provide the most recent regulatory thought on this issue. The basic issue addressed by NUREG-1317 is the definition of an adequate licensing basis for the renewal of a plant license. The report contemplates three alternatives in this regard. This paper discusses each of these three proposals. The NUMARC NUPLEX Working Group endorses a license renewal process based on a plant's current licensing basis along with an evaluation of the pertinent components, systems, and structures affected by age-related degradation. The NUMARC NUPLEX Working group believes that an appropriate scope for NRC review of the license renewal application should focus on those safety-significant structures systems, and components subject to significant age-related degradation that are not subject to existing recognized effective replacement, refurbishment, or inspection programs. The paper also briefly discusses NUMARC's view of the role of the Backfit Rule in the license renewal process

  18. License renewal in the United States

    International Nuclear Information System (INIS)

    Brons, Jack

    2002-01-01

    Full text: Nuclear plants in the United States are licensed for 40 years, a length specified in the Atomic Energy Act of 1954, which laid out much of the regulatory basis for the commercial nuclear industry. The Act, however, made provision for license renewal. The original 40-year license period was chosen arbitrarily by the U.S. Congress because it was the typical period over which utilities recovered their investment in electricity generating plants. Nuclear plants, however, are subject to a rigorous program of Nuclear Regulatory Commission oversight, maintenance and equipment replacement. In effect, they must be in the same operating condition on the last day of their licenses as they were on the first. As the industry matured, it became apparent that there was no physical limitation on the continued operation of nuclear plants past 40 years. The industry turned its attention toward license renewal. When the issue was first raised, the NRC considered stringent process equivalent to seeking a new operating license for each plant. The complexity, length and cost of the process made it unlikely that many nuclear plants would seek license renewal. The nuclear industry worked successfully with NRC on the application of generic principles to license renewal, however, and in 1995, the NRC issued an efficient, tightly-focused rule that made license renewal a safe, viable option. To extend the operating license for a reactor, a company must demonstrate to the NRC that aging effects will be adequately managed during the renewal terms, thus ensuring equipment functionality. The rule allows licensees to apply for extensions of up to 20 years. The first license renewal application was filed in 1998 by the owner of the two-unit Calvert Cliffs plant. Shortly thereafter, an application was filed for the three-unit Oconee Nuclear Station. The NRC renewed the licenses for all five units in 2000, and since then, five more licenses have been renewed. The NRC has received 37

  19. Screening Analysis of Criticality Features, Events, and Processes for License Application

    International Nuclear Information System (INIS)

    J.A. McClure

    2004-01-01

    This report documents the screening analysis of postclosure criticality features, events, and processes. It addresses the probability of criticality events resulting from degradation processes as well as disruptive events (i.e., seismic, rock fall, and igneous). Probability evaluations are performed utilizing the configuration generator described in ''Configuration Generator Model'', a component of the methodology from ''Disposal Criticality Analysis Methodology Topical Report''. The total probability per package of criticality is compared against the regulatory probability criterion for inclusion of events established in 10 CFR 63.114(d) (consider only events that have at least one chance in 10,000 of occurring over 10,000 years). The total probability of criticality accounts for the evaluation of identified potential critical configurations of all baselined commercial and U.S. Department of Energy spent nuclear fuel waste form and waste package combinations, both internal and external to the waste packages. This criticality screening analysis utilizes available information for the 21-Pressurized Water Reactor Absorber Plate, 12-Pressurized Water Reactor Absorber Plate, 44-Boiling Water Reactor Absorber Plate, 24-Boiling Water Reactor Absorber Plate, and the 5-Defense High-Level Radioactive Waste/U.S. Department of Energy Short waste package types. Where defensible, assumptions have been made for the evaluation of the following waste package types in order to perform a complete criticality screening analysis: 21-Pressurized Water Reactor Control Rod, 5-Defense High-Level Radioactive Waste/U.S. Department of Energy Long, and 2-Multi-Canister Overpack/2-Defense High-Level Radioactive Waste package types. The inputs used to establish probabilities for this analysis report are based on information and data generated for the Total System Performance Assessment for the License Application, where available. This analysis report determines whether criticality is to be

  20. The Monticello license renewal project

    International Nuclear Information System (INIS)

    Clauss, J.M.; Harrison, D.L.; Pickens, T.A.

    1993-01-01

    Today, 111 nuclear power plants provide over 20 percent of the electrical energy generated in the United States. The operating license of the oldest operating plant will expire in 2003, one-third of the existing operating licenses will expire by 2010 and the newest plant's operating license will expire in 2033. The National Energy Strategy (NES) prepared by the Department of Energy (DOE) assumes that 70 percent of the current operating plants will continue to operate beyond their current license expiration. Power from current operating plants can assist in ensuring an adequate, diverse, and environmentally acceptable energy supply for economic growth and improved U.S. competitiveness. In order to preserve this energy resource, three major tasks must be successfully completed: (1) establishment of regulations, technical standards, and procedures for the preparation and review of License Renewal Applications (LRAs); (2) development of technical criteria and bases for monitoring, refurbishing or replacing plant equipment; and (3) demonstration of the regulatory process by a plant obtaining a renewed license. Since 1986, the DOE has been working with the nuclear industry and the Nuclear Regulatory Commission (NRC) to establish and demonstrate the option to extend the life of a nuclear power plant by renewing the operating license. The Monticello Lead Plant demonstration project was initiated in September 1988, following the Pilot Plant studies. This paper is primarily focused on the status and insights gained from the Northern States Power Company (NSP) Monticello Lead Plant demonstration project. The following information is included: (1) Current Status - Monticello License Renewal Application; (2) Economic Analysis; (3) License Renewal Regulatory Uncertainty Issues; (4) Key Decisions; (5) Management Structure; (6) Technical and Licensing Perspective; (7) NRC Interactions; (8) Summary

  1. Shirley Basin Uranium Mill. Environmental report to accompany source material license application

    International Nuclear Information System (INIS)

    1975-12-01

    This document summarizes all of the environmental monitoring conducted by Utah. This Environmental Report consequently supplements and updates the information presented in the Source Material License application of August 18, 1970 and the Final Environmental Statement (FES) of December 1974. Water and air quality, liquid waste management, soil/vegetation monitoring, and reclamation are covered

  2. Licensing and advanced fuel designs

    International Nuclear Information System (INIS)

    Davidson, S.L.; Novendstern, E.H.

    1991-01-01

    For the past 15 years, Westinghouse has been actively involved in the development and licensing of fuel designs that contain major advanced features. These designs include the optimized fuel assembly, The VANTAGE 5 fuel assembly, the VANTAGE 5H, and most recently the VANTAGE+ fuel assembly. Each of these designs was supported by extensive experimental data, safety evaluations, and design efforts and required intensive interaction with the US Nuclear Regulatory Commission (NRC) during the review and approval process. This paper presents a description of the licensing approach and how it was utilized by the utilities to facilitate the licensing applications of the advanced fuel designs for their plants. The licensing approach described in this paper has been successfully applied to four major advanced fuel design changes ∼40 plant-specific applications, and >350 cycle-specific reloads in the past 15 years

  3. Facilities license application record data as of April 1, 1981. Tri-annual report 30 Nov 80-1 Apr 81

    International Nuclear Information System (INIS)

    1981-06-01

    The FLAR is divided into three parts as follows: Part I - The first part is a listing of all operating licenses, authorizations and construction permits in effect plus applications pending; Part II - The second part is a listing of applications that have been withdrawn or denied, and licenses and construction permits terminated or revoked; and Part III - The third part is a listing of research, test and power reactors for export

  4. Nuclear plant license renewal

    International Nuclear Information System (INIS)

    Gazda, P.A.; Bhatt, P.C.

    1991-01-01

    During the next 10 years, nuclear plant license renewal is expected to become a significant issue. Recent Electric Power Research Institute (EPRI) studies have shown license renewal to be technically and economically feasible. Filing an application for license renewal with the Nuclear Regulatory Commission (NRC) entails verifying that the systems, structures, and components essential for safety will continue to perform their safety functions throughout the license renewal period. This paper discusses the current proposed requirements for this verification and the current industry knowledge regarding age-related degradation of structures. Elements of a license renewal program incorporating NRC requirements and industry knowledge including a schedule are presented. Degradation mechanisms for structural components, their significance to nuclear plant structures, and industry-suggested age-related degradation management options are also reviewed

  5. 76 FR 4417 - Liberty Natural Gas LLC, Liberty Liquefied Natural Gas (LNG) Deepwater Port License Application

    Science.gov (United States)

    2011-01-25

    ... DEPARTMENT OF TRANSPORTATION Maritime Administration [USCG-2010-0993] Liberty Natural Gas LLC, Liberty Liquefied Natural Gas (LNG) Deepwater Port License Application AGENCY: Maritime Administration... application describes an offshore natural gas deepwater port facility that would be located approximately 16.2...

  6. 75 FR 3261 - Powertech (USA) Inc.; Dewey-Burdock Project; New Source Material License Application; Notice of...

    Science.gov (United States)

    2010-01-20

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 40-9075; NRC-2009-0575] Powertech (USA) Inc.; Dewey... review process related to the Dewey- Burdock Uranium Project application, please contact the NRC... documents associated with the Dewey-Burdock Uranium Project, including the license application, are...

  7. Perspective about the US license Renewal for NNPP's

    International Nuclear Information System (INIS)

    Lehnert, D. F.

    2004-01-01

    This article provides and overview of the US License Renewal Rule, 10 CFR 54, and its implementation in the US leading to the preparation and review of a license renewal application. The key regulatory documents and the industry's methodology and guidance for successfully implementing the Rule are discussed. While the process still undergoes change and optimization, it has become predictable and reliable, such that utilities can establish realistic schedules and budgets to complete the license renewal process. Nearly 60% of the US operating units have either received and extended operating license, have submitted their application for review, or have committed to submit an application in the next few years. The article concludes with a discussion of lessons learned from this wealth of experience and some emerging issues that may affect license renewal process. (Author)

  8. 75 FR 69080 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-11-10

    ... license as a Non-Vessel-Operating Common Carrier (NVO), and/or Ocean Freight Forwarder (OFF)--Ocean..., Building 14-A, Kenner, LA 70062, Officers: Gary J. Cheramie, President (Qualifying Individual), George...: License Transfer. Total Global Solutions, Inc. (NVO & OFF), 4290 Bells Ferry Road 224, Suite 106, Kennesaw...

  9. Non-Power Reactor Operator Licensing Examiner Standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR Part 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, this standard will be revised periodically to accommodate comments and reflect new information or experience

  10. 78 FR 32650 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-05-31

    ... Change Abaco Logistics Corporation (OFF), 8051 NW 67th Street, Miami, FL 33166, Officers: Manuel T. Soto...: New NVO & OFF License Star Cluster Logistics (NVO & OFF), 4 Executive Circle, Suite 170, Irvine, CA... License Straight Forwarding, Inc. (NVO & OFF), 20974 Currier Road, City of Industry, CA 91789, Officer: Yi...

  11. Organisational Learning: Theoretical Shortcomings and Practical Challenges

    Directory of Open Access Journals (Sweden)

    Jon Aarum Andersen

    2014-05-01

    Full Text Available This paper addresses two problems related to learning and the use of knowledge at work. The first problem is the theoretical shortcomings stemming from the controversy between three different concepts of ‘organisational learning.’ In order to enhance scholarship in this field the notion that organisations - as organisations - can learn need to be rejected for theoretical and empirical reasons. The metaphorical use of ‘organisational learning’ creates only confusion. Learning is a process and knowledge is the outcome of that process. It is argued that learning and knowledge is only related to individuals. Knowledge is thus the individual capability to draw distinctions, within a domain of action, based on an appreciation of context or theory. Consequently, knowledge becomes organisational when it is created, developed and transmitted to other individuals in the organisation. In a strict sense knowledge becomes organisational when employees use it and act based on generalisations due to the rules and procedures found in their organisation. The gravest problem is practical challenges due to the fact that the emphasis on learning, knowledge and competence of the working force do not materialize in the application of the knowledge acquired. It is evident that employees do not use their increased knowledge. However, we do not know why they do not use it. An enormous waste of money is spent on learning and knowledge in organisations which does not yield what is expected. How can managers act in order to enhance the application of increased knowledge possessed by the workforce?

  12. Licensing of away-from-reactor (AFR) installations

    International Nuclear Information System (INIS)

    Gray, P.L.

    1980-01-01

    Storage of spent fuel at Away-From-Reactor (AFR) installations will allow reactors to continue to operate until reprocessing or other fuel disposal means are available. AFR installations must be licensed by the Nuclear Regulatory Commission (NRC). Although wide experience in licensing reactors exists, the licensing of an AFR installation is a relatively new activity. Only one has been licensed to date. This paper delineates the requirements for licensing an AFR installation and projects a licensing schedule. Because the NRC is developing specific AFR requirements, this schedule is based primarily on draft NRC documents. The major documents needed for an AFR license application are similar to those for a reactor. They include: a Safety Analysis Report (SAR), and Environmental Report (ER), safeguards and security plans, decommissioning plans, proposed technical specifications, and others. However, the licensing effort has one major difference in that for AFR installations it will be a one-step effort, with follow-up, rather than the two-step process used for reactors. The projected licensing schedule shows that the elapsed time between filing an application and issuance of a license will be about 32 months, assuming intervention. The legal procedural steps will determine the time schedule and will override considerations of technical complexity. A license could be issued in about 14 months in the absence of intervention

  13. Dry spent fuel storage licensing

    International Nuclear Information System (INIS)

    Sturz, F.C.

    1995-01-01

    In the US, at-reactor-site dry spent fuel storage in independent spent fuel storage installations (ISFSI) has become the principal option for utilities needing storage capacity outside of the reactor spent fuel pools. Delays in the geologic repository operational date at or beyond 2010, and the increasing uncertainty of the US Department of Energy's (DOE) being able to site and license a Monitored Retrievable Storage (MRS) facility by 1998 make at-reactor-site dry storage of spent nuclear fuel increasingly desirable to utilities and DOE to meet the need for additional spent fuel storage capacity until disposal, in a repository, is available. The past year has been another busy year for dry spent fuel storage licensing. The licensing staff has been reviewing 7 applications and 12 amendment requests, as well as participating in inspection-related activities. The authors have licensed, on a site-specific basis, a variety of dry technologies (cask, module, and vault). By using certified designs, site-specific licensing is no longer required. Another new cask has been certified. They have received one new application for cask certification and two amendments to a certified cask design. As they stand on the brink of receiving multiple applications from DOE for the MPC, they are preparing to meet the needs of this national program. With the range of technical and licensing options available to utilities, the authors believe that utilities can meet their need for additional spent fuel storage capacity for essentially all reactor sites through the next decade

  14. 78 FR 40519 - Cooper Nuclear Station; Application and Amendment to Facility Operating License Involving...

    Science.gov (United States)

    2013-07-05

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-298; NRC-2013-0139] Cooper Nuclear Station; Application and Amendment to Facility Operating License Involving Proposed No Significant Hazards..., issued to Nebraska Public Power District (the licensee), for operation of the Cooper Nuclear Station (CNS...

  15. Guide for the preparation of applications for licenses for the use of self-contained dry source-storage irradiators. Second proposed Revision 1

    International Nuclear Information System (INIS)

    Bassin, N.

    1984-10-01

    The purpose of this regulatory guide is to provide assistance to applicants and licensees in preparing applications for new licenses, license amendments, and license renewals for the use of self-contained dry source-storage irradiators. These irradiators are constructed so that the sealed sources and the material being irradiated are contained in a shielded volume and there is no external radiation beam during the use of the irradiator. The radioisotopes most commonly used for these irradiators are cobalt-60 and cesium-137

  16. Licensing of New Nuclear Power Plants in Canada

    International Nuclear Information System (INIS)

    Schwarz, Garry; Miller, Doug

    2011-01-01

    The regulatory process for new power plant licensing in Canada, from receipt of the initial application to commercial operation, can be divided into three phases: - Environmental Assessment (EA) and License to Prepare Site; - License to Construct; and - License to Operate. The Nuclear Safety and Control Act (NSCA) does not have provisions for combined licenses for site preparation, construction, or operation. Separate licenses must, therefore, be granted for each phase, and would be issued in sequence. However, applications to prepare a site, to construct and to operate a new nuclear power plant could be assessed in parallel. The total duration from the application for the License to Prepare Site to the issuance of the License to Operate (which is a prerequisite for first fuel load) has been established as 9 years subject to certain factors. To help facilitate this timeline, the CNSC has undertaken an aggressive program of documenting regulatory practices, requirements and guidance to assist applicants in submitting complete applications. Working level procedures to assist CNSC staff in their review of submissions are also under development. Extensive program and project management has been introduced to ensure that timelines will be achieved. In parallel with the above activities, regulatory oversight measures to be employed during site preparation activities and plant construction and commissioning are also being developed. On the international front, the CNSC is participating in the MDEP program to leverage the resources and knowledge of other national regulatory authorities in reviews the CNSC is undertaking. The CNSC also participates in IAEA and other international activities to utilize/adapt international practices as appropriate in Canada. (authors)

  17. 18 CFR 16.10 - Information to be provided by an applicant for new license: Filing requirements.

    Science.gov (United States)

    2010-04-01

    ... FEDERAL POWER ACT PROCEDURES RELATING TO TAKEOVER AND RELICENSING OF LICENSED PROJECTS Applications for... redistribution of power flows on line loading (with respect to applicable thermal, voltage, or stability limits... governmental agencies and subdivisions likely to be interested in or affected by the proposed expansion. (11...

  18. 47 CFR 25.137 - Application requirements for earth stations operating with non-U.S. licensed space stations.

    Science.gov (United States)

    2010-10-01

    ... space stations. (a) Earth station applicants or entities filing a “letter of intent” or “Petition for... Union. (d) Earth station applicants requesting authority to operate with a non-U.S.-licensed space... 47 Telecommunication 2 2010-10-01 2010-10-01 false Application requirements for earth stations...

  19. Challenges of SMR licensing practices

    Energy Technology Data Exchange (ETDEWEB)

    Soderholm, K., E-mail: kristiina.soderholm@fortum.com [Fortum Power, Espoo (Finland)

    2012-12-15

    This paper aims to increase the understanding of high level Nuclear Power Plant (NPP) licensing processes in Finland, France, the UK, Canada and the USA. These countries have been selected for this study because of their different licensing processes and recent actions in new NPP construction. After discussing their similarities and differences, suitable features for Small Modular Reactor licensing can be emphasized and suggested. Some of the studied licensing processes have elements that are already quite well suited for application to SMRs, but all of these different national processes can benefit from studying and implementing lessons learned from SMR specific licensing needs. The main SMR features to take into account in licensing are standardization of the design, modularity, mass production and serial construction. Modularity can be divided into two different categories: the first category is simply a single unit facility constructed of independently engineered modules (e.g., construction process for Westinghouse AP-1000 NPP) and the second is a facility structure composed of many reactor modules where modules are manufactured in factories and installed into the facility as needed (e.g., NuScale Power SMR design). Short construction schedules will not be fully benefited from if the long licensing process prolongs the commissioning and approach to full-power operation. The focus area of this study is to better understand the possibility of SMR deployment in small nuclear countries, such as Finland, which currently has four operating NPPs. The licensing process needs to be simple and clear to make SMR deployment feasible from an economical point of view. This paper uses public information and interviews with experts to establish the overview of the different licensing processes and their main steps. A high-level comparison of the licensing steps has been carried out. Certain aspects of the aviation industry licensing process have also been studied and certain

  20. On the “non-discrimination” aspect of FRAND licensing: A response to the Indian Competition Commission's recent orders

    Directory of Open Access Journals (Sweden)

    David J. Teece

    2018-03-01

    Full Text Available The Indian Competition Commission has recently challenged Ericsson's practice of licensing its standards-essential patents (SEPs, relating to cellular standards, for percentage-based royalties based on the selling prices of the end-user licensed products. Ericsson had committed to the relevant standards-development organisation that it would license its SEPs on “fair, reasonable and non-discriminatory” (“FRAND” terms. The Commission contends that such royalties are “prima facie discriminatory” in violation of the Competition Act, in the (novel sense that different products selling for different prices pay different per-unit royalties. We analyse the broader implications of the Commission's reasoning, concerned that if adopted, the Commission's reasoning would disrupt common industry licensing practices. Keywords: Patents, Licensing, Discrimination, Telecommunications, FRAND, Standards, Industry practice

  1. Nuclear Regulatory Commission staff development of the license application review plan for a high-level radioactive waste repository

    International Nuclear Information System (INIS)

    Johnson, R.L.; Holonich, J.J.; Lee, M.P.; Delligatti, M.S.

    1993-01-01

    The Nuclear Regulatory Commission staff has recently started a new initiative to develop the License Application Review Plan (LARP) which the staff will use in its reviews of the U.S. Department of Energy's (DOE's) license application (LA) for a geologic repository for the disposal of high-level radioactive waste (HLW). This paper describes the staff's approach for developing the LARP, the development schedule and current status, the organization and content of the LARP, and the staff's LA review strategy. Therefore, it gives a preview of the draft LARP which will be made available in late 1993. It also describes how the LARP will be used as guidance to the staff in conducting reviews of regulatory and technical issues important to the licensing of a geologic repository. Finally, the benefits to the NRC staff, DOE, and other parties are discussed

  2. 47 CFR 25.117 - Modification of station license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Modification of station license. 25.117 Section 25.117 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses General Application Filing Requirements § 25.117...

  3. Organisational learning by way of organisational development

    DEFF Research Database (Denmark)

    Elkjær, Bente

    In the paper, the idea is explored of organisational learning as the opening andclosure of organisational space for inquiry or reflective thinking, as a way toconstruct organisational learning as an object for research. This is done by asking thequestion of whether an organisational development...... project contributes toorganisational learning. The point of departure is a municipality in Denmark workingtoward digitalising its administration. The conclusion is that the success of such aprocess very much depends on an organisation's ability to encompass severalunderstandings of organisational...... development and digital administration and tosustain them in a productive form of tension instead of pursuing only one of them....

  4. Evaluation of organisational culture and nurse burnout.

    Science.gov (United States)

    Watts, Jenny; Robertson, Noelle; Winter, Rachel; Leeson, David

    2013-10-01

    A survey of nurses working with older adults across three NHS trusts was conducted to explore how perceptions of the workplace affect nurse wellbeing. Standardised validated measures were used to assess burnout, perceived organisational support and organisational culture. Significant associations were found between innovative organisational culture and nurses' sense of personal accomplishment, which reduce the likelihood of burnout. Multiple regression showed experience of burnout to be predicted by the nature of organisational culture. It seems therefore that nurses' wellbeing may be affected by their perceptions of the working environment. Applications of this knowledge and suggestions for future research are discussed.

  5. Strategic Basis for License Application Planning for a Potential Yucca Mountain Repository

    International Nuclear Information System (INIS)

    Newberry, C. M.; Brocoum, S. J.; Gamble, R. P.; Murray, R. C.; Cline, M.

    2002-01-01

    If Yucca Mountain, Nevada is designated as the site for development of a geologic repository for disposal of spent nuclear fuel and high-level radioactive waste, the Department of Energy (DOE) must obtain Nuclear Regulatory Commission (NRC) approval first for repository construction, then for an operating license, and, eventually, for repository closure and decommissioning. The licensing criteria defined in Code of Federal Regulations, Title 10, Part 63 (10 CFR Part 63) establish the basis for these NRC decisions. Submittal of a license application (LA) to the NRC for authorization to construct a repository at the Yucca Mountain site is, at this point, only a potential future action by the DOE. The policy process defined in the Nuclear Waste Policy Act (NWPA), as amended, for recommendation and designation of Yucca Mountain as a repository site makes it difficult to predict whether or when the site might be designated. The DOE may only submit a LA to the NRC if the site designation takes effect. In spite of this uncertainty, the DOE must take prudent and appropriate action now, and over the next several years, to prepare for development and timely submittal of a LA. This is particularly true given the need for the DOE to develop, load, and certify the operation of its electronic information system to provide access to its relevant records as part of the licensing support network (LSN) in compliance with NRC requirements six months prior to LA submittal. The DOE must also develop a LA, which is a substantially different document from those developed to support a Site Recommendation (SR) decision. The LA must satisfy NRC licensing criteria and content requirements, and address the acceptance criteria defined by the NRC in its forthcoming Yucca Mountain Review Plan (YMRP). The content of the LA must be adequate to facilitate NRC acceptance and docketing for review, and the LA and its supporting documents must provide the documented basis for the NR C findings required

  6. 9 CFR 2.6 - Annual license fees.

    Science.gov (United States)

    2010-01-01

    ... method used to calculate the license fee. All initial license and changed class of license fees must be... research facilities, dealers, exhibitors, retail pet stores, and persons for use as pets, directly or through an auction sale, by the dealer or applicant during his or her preceding business year (calendar or...

  7. Integration of MGDS design into the licensing process

    International Nuclear Information System (INIS)

    1997-12-01

    This paper presents an overview of how the Mined Geologic Disposal System (MGDS) design for a potential repository is integrated into the licensing process. The integration process employs a two-told approach: (1) ensure that the MGDS design complies with applicable Nuclear Regulatory Commission (NRC) licensing requirements, and (2) ensure that the MGDS design is appropriately reflected in a license application that is acceptable to the NRC for performing acceptance and compliance reviews

  8. Human and Organisational Factors in the Licensing Process for New NPPs: The Swiss Approach

    International Nuclear Information System (INIS)

    Ryser, Cornelia

    2011-01-01

    Past and recent construction as well as operating experience has shown the importance of giving due attention to human and organisational factors (HOF) in the design and construction of new NPPs. The present paper primarily deals with the development of regulatory requirements by the Swiss Federal Nuclear Safety Inspectorate (ENSI) concerning HOF engineering aspects, i.e. the design of the work systems of the new NPP (technical systems, work tasks, operating organisation). The requirements concerning quality and project management or the management system in general are not in the main focus of this paper. The approach and requirements presented are not yet fully implemented in the Swiss regulatory framework and are still being worked on. Therefore the issues described in the paper have to be considered as provisional and might still be subject to some change in the next months as the approach and requirements are being further developed and finalised. (author)

  9. License Application Design Selection Report, REV 01. August 1999

    International Nuclear Information System (INIS)

    Hastings, C.R.

    1999-01-01

    In December 1998, the U.S. Department of Energy (DOE) published the ''Viability Assessment of a Repository at Yucca Mountain'' (DOE 1998b). The Viability Assessment described a preliminary design of a potential repository at Yucca Mountain, Nevada, for disposal of spent nuclear fuel and high-level radioactive waste, and assessed the probable behavior of that repository design in the Yucca Mountain geologic setting. The report concluded that 'Yucca Mountain remains a promising site for a geologic repository and that work should proceed to support a decision in 2001 on whether to recommend the site to the President for development as a repository'. It also concluded that 'uncertainties remain about key natural processes, the preliminary design, and how the site and design would interact'. Recognizing that the design that was evaluated will be refined before a license application could be submitted, the Viability Aassesment notes that 'DOE is evaluating several design options and alternatives that could reduce existing uncertainty and improve the performance of the repository system'. During the preparation of the Viability Assessment, DOE asked the contractor for the Civilian Radioactive Waste Management Program to study alternative design concepts for a potential geologic repository for high-level radioactive waste at Yucca Mountain. The License Application Design Selection (LADS) project was initiated to conduct that study. The goal of the project was to develop and evaluate a diverse range of conceptual repository designs that work well in concert with the Yucca Mountain site and to recommend an initial design concept for the possible Site Recommendation and License Apllication. This report presents the results of the LADS project. The design process consisted of two phases. In Phase I, a series of basic design concepts (design alternatives) and components (design features) were analyzed for their potential value as elements of a repository design. In Phase II

  10. Consolidated guidance about materials licenses: Program-specific guidance about portable gauge licenses. Final report; Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Vacca, P.C.; Whitten, J.E.; Pelchat, J.M.; Arredondo, S.A.; Matson, E.R.; Lewis, S.H.; Collins, D.J.; Santiago, P.A. [Nuclear Regulatory Commission, Washington, DC (United States). Div. of Industrial and Medical Nuclear Safety; Tingle, W. [Dept. of Environment, Health, and Natural Resources, Raleigh, NC (United States). Div. of Radiation Protection

    1997-05-01

    As part of its redesign of the materials licensing process, NRC is consolidating and updating numerous guidance documents into a single comprehensive repository as described in NUREG-1539 and draft NUREG-1541. NUREG-1556, Vol. 1, is the first program-specific guidance developed for the new process and will serve as a template for subsequent program-specific guidance. This document is intended for use by applicants, licensees, and NRC staff and will also be available to Agreement States. This document supersedes the guidance previously found in draft Regulatory Guide DG-0008, ``Applications for the Use of Sealed Sources in Portable Gauging Devices,`` and in NMSs Policy and guidance Directive 2-07, ``Standard Review Plan for Applications for Use of Sealed Sources in Portable Gauging Devices.`` This final report takes a more risk-informed, performance-based approach to licensing portable gauges, and reduces the information(amount and level of detail) needed to support an application to use these devices. It incorporates many suggests submitted during the comment period on draft NUREG-1556, Volume 1. When published, this final report should be used in preparing portable gauge license applications. NRC staff will use this final report in reviewing these applications.

  11. Consolidated guidance about materials licenses: Program-specific guidance about portable gauge licenses. Final report; Volume 1

    International Nuclear Information System (INIS)

    Vacca, P.C.; Whitten, J.E.; Pelchat, J.M.; Arredondo, S.A.; Matson, E.R.; Lewis, S.H.; Collins, D.J.; Santiago, P.A.; Tingle, W.

    1997-05-01

    As part of its redesign of the materials licensing process, NRC is consolidating and updating numerous guidance documents into a single comprehensive repository as described in NUREG-1539 and draft NUREG-1541. NUREG-1556, Vol. 1, is the first program-specific guidance developed for the new process and will serve as a template for subsequent program-specific guidance. This document is intended for use by applicants, licensees, and NRC staff and will also be available to Agreement States. This document supersedes the guidance previously found in draft Regulatory Guide DG-0008, ''Applications for the Use of Sealed Sources in Portable Gauging Devices,'' and in NMSs Policy and guidance Directive 2-07, ''Standard Review Plan for Applications for Use of Sealed Sources in Portable Gauging Devices.'' This final report takes a more risk-informed, performance-based approach to licensing portable gauges, and reduces the information(amount and level of detail) needed to support an application to use these devices. It incorporates many suggests submitted during the comment period on draft NUREG-1556, Volume 1. When published, this final report should be used in preparing portable gauge license applications. NRC staff will use this final report in reviewing these applications

  12. List of Nuclear Materials Licensing Actions Received

    Data.gov (United States)

    Nuclear Regulatory Commission — A catalog of all Materials Licensing Actions received for review. The catalog lists the name of the entity submitting the license application, their city and state,...

  13. 75 FR 4571 - Government-Owned Inventions; Availability for Licensing

    Science.gov (United States)

    2010-01-28

    .... Applications: Therapies for tumors associated with NF1 (including brain and peripheral nervous system tumors...-US-01). Licensing Status: Available for licensing. Licensing Contact: Patrick P. McCue, Ph.D.; 301...

  14. 10 CFR 34.13 - Specific license for industrial radiography.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Specific license for industrial radiography. 34.13 Section 34.13 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY... industrial radiography. An application for a specific license for the use of licensed material in industrial...

  15. NEP Nuclear Power Plant, Units 1 and 2. License application, general and financial information

    International Nuclear Information System (INIS)

    1976-01-01

    A license application is presented for 2 pressurized water reactors at a proposed location in Charlestown RI. Each reactor will have a net capacity of 1150 MW. Cooling water will be supplied by the Atlantic Ocean. NEP-1 is scheduled for operation in 1983 and NEP-2 in 1985

  16. Review process for low-level radioactive waste disposal license application under Low-Level Radioactive Waste Policy Amendments Act

    International Nuclear Information System (INIS)

    Pittiglio, C.L. Jr.

    1987-08-01

    This document estimates the level of effort and expertise that is needed to review a license application within the required time. It is intended to be used by the NRC staff as well as States and interested parties to provide a better understanding of what the NRC envisions will be involved in licensing a low-level radioactive waste disposal facility. 5 refs., 3 figs., 1 tab

  17. Palo Verde Generating Station, Units 4 and 5. License application, general information

    International Nuclear Information System (INIS)

    1978-01-01

    A license application for two more Palo Verde reactors, Units 4 and 5, is presented. The two PWR reactors have a nominal net generating power each of 1,270 MW(e). Containments are steel-lined prestressed cylindrical structures with hemispherical domes. The reactors are replicas of Palo Verde 1, 2 and 3 (see DOCKETS 50528, 50529 and 50530) using the standard Combustion Engineering System 80 (see DOCKET-STN-50470)

  18. 76 FR 63668 - Guidelines for Preparing and Reviewing Licensing Applications for the Production of Radioisotopes

    Science.gov (United States)

    2011-10-13

    ..., Research and Test Reactors Projects Branch, Division of Policy and Rulemaking, Office of Nuclear Reactor... NUCLEAR REGULATORY COMMISSION [NRC-2011-0135] Guidelines for Preparing and Reviewing Licensing Applications for the Production of Radioisotopes AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim...

  19. 76 FR 71082 - Strata Energy, Inc., Ross Uranium Recovery Project; New Source Material License Application...

    Science.gov (United States)

    2011-11-16

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 40-9091; NRC-2011-0148] Strata Energy, Inc., Ross Uranium Recovery Project; New Source Material License Application; Notice of Intent To Prepare a... intent to prepare a supplemental environmental impact statement. SUMMARY: Strata Energy, Inc. (Strata...

  20. Gibbs and Hill Standard Safety Analysis Report, GIBBSSAR. License application, volume 1: chapters 1--3 (section 7)

    International Nuclear Information System (INIS)

    1977-01-01

    License application for the GIBBSSAR Standard Plant is presented. The reactor used with the GIBBSSAR balance-of-plant system is the Westinghouse 3800 MW(t) PWR. This portion of the application includes a general plant description; site characteristics; and design of structures, components, equipment and systems

  1. License Application Design Selection Feature Report: Aging and Blending

    International Nuclear Information System (INIS)

    Coltoni, B.; Anderson, M.J.

    1999-01-01

    The purpose of this document is to evaluate the concepts of Aging and Blending for waste sent to the Monitored Geologic Repository (MGR). These design features are based on pre-emplacement treatment of the waste stream. The envelope of the analysis has been performed under the direction of the License Application Design Selection Team (LADST), which advocated utilizing the Viability Assessment (VA) repository design (DOE 1998c) as the basis. Therefore, this evaluation attempts to modify the VA design only to the extent that Aging and Blending can be accomplished. This modified VA design will be contrasted to the VA Design and the difference in design, costs, and performance will be presented

  2. Selection, training, qualification and licensing of Three Mile Island reactor operating personnel

    International Nuclear Information System (INIS)

    Eytchison, R.M.

    1980-01-01

    The various programs which were intended to staff Three Mile Island with competent, trained operators and supervisors are reviewed. The analysis includes a review of the regulations concerning operator training and licensing, and describes how the requirements were implemented by the NRC, Metropolitan Edison Company, and Babcock and Wilcox Company. Finally the programs conducted by these three organisations are evaluated. (U.K.)

  3. Regulatory guidance for license renewal

    International Nuclear Information System (INIS)

    Thoma, John A.

    1991-01-01

    The proposed 10 CFR Part 54 rule proceduralizes the process for license renewal by identifying both the administrative and technical requirements for a renewal application. To amplify and support this regulation, written guidance has been provided in the form of a draft Regulatory Guide (DG 1009) and a draft Standard Review Plan for License Renewal (NUREG 1299). This guidance is scheduled to be finalized in 1992. Similar guidance will be provided for the proposed revisions to 10 CFR Part 51 concerning the environmental aspects of license renewal. (author)

  4. ITER Safety and Licensing

    International Nuclear Information System (INIS)

    Girard, J-.P; Taylor, N.; Garin, P.; Uzan-Elbez, J.; GULDEN, W.; Rodriguez-Rodrigo, L.

    2006-01-01

    The site for the construction of ITER has been chosen in June 2005. The facility will be implemented in Europe, south of France close to Marseille. The generic safety scheme is now under revision to adapt the design to the host country regulation. Even though ITER will be an international organization, it will have to comply with the French requirements in the fields of public and occupational health and safety, nuclear safety, radiation protection, licensing, nuclear substances and environmental protection. The organization of the central team together with its partners organized in domestic agencies for the in-kind procurement of components is a key issue for the success of the experimentation. ITER is the first facility that will achieve sustained nuclear fusion. It is both important for the experimental one-of-a-kind device, ITER itself, and for the future of fusion power plants to well understand the key safety issues of this potential new source of energy production. The main safety concern is confinement of the tritium, activated dust in the vacuum vessel and activated corrosion products in the coolant of the plasma-facing components. This is achieved in the design through multiple confinement barriers to implement the defence in depth approach. It will be demonstrated in documents submitted to the French regulator that these barriers maintain their function in all postulated incident and accident conditions. The licensing process started by examination of the safety options. This step has been performed by Europe during the candidature phase in 2002. In parallel to the final design, and taking into account the local regulations, the Preliminary Safety Report (RPrS) will be drafted with support of the European partner and others in the framework of ITER Task Agreements. Together with the license application, the RPrS will be forwarded to the regulatory bodies, which will launch public hearings and a safety review. Both processes must succeed in order to

  5. NPP License Renewal and Aging Management: Revised Guidance

    International Nuclear Information System (INIS)

    Hull, A.B.; Hiser, A.L.; Lindo-Talin, S.E.

    2012-01-01

    Based on the Atomic Energy Act, the NRC issues licenses for commercial power reactors to operate for up to 40 years and allows these licenses to be renewed for up to another 20 years. NRC has approved license renewal for well over 50% of U.S. located reactors originally licensed to operate for 40 years. Of these 104 reactors (69 PWRs, 35 BWRs), the NRC has issued renewed licenses for 71 units and is currently reviewing applications for another 15 units. As of May 1, 2012, ten plants at nine sites had entered their 41st year of operation and thus are in their first period of extended operation (PEO). Five more plants will enter the PEO by the end of 2012. One foundation of the license renewal process has been license renewal guidance documents (LRGDs). The U.S. Nuclear Regulatory Commission (NRC) revised key guidance documents used for nuclear power license renewal in 2010 and 2011. These include NUREG-1800, 'Standard Review Plan for Review of License Renewal Applications,' revision 2 (SRP-LR), and NUREG-1801, 'Generic Aging Lessons Learned (GALL) Report,' revision 2 (GALL Report). The guidance documents were updated to reflect lessons learned and operating experience gained since the guidance documents were last issued in 2005. (author)

  6. 75 FR 54330 - Intent To Grant an Exclusive Field of Use License of a U.S. Government-Owned Patent Application

    Science.gov (United States)

    2010-09-07

    ... DEPARTMENT OF DEFENSE Department of the Army Intent To Grant an Exclusive Field of Use License of a U.S. Government-Owned Patent Application AGENCY: Department of the Army, DoD. ACTION: Notice... intent to grant an exclusive, revocable license for the field of use in the research reagent market to...

  7. 75 FR 39668 - Intent To Grant a Field of Use Exclusive License of a U.S. Government-Owned Patent Application

    Science.gov (United States)

    2010-07-12

    ... DEPARTMENT OF DEFENSE Department of the Army Intent To Grant a Field of Use Exclusive License of a U.S. Government-Owned Patent Application AGENCY: Department of the Army, DoD. ACTION: Notice... intent to grant a field of use exclusive, revocable license for the field of shigella vaccine development...

  8. Guide to request license for teletherapy practice

    International Nuclear Information System (INIS)

    2000-01-01

    In this work the steps to request license for teletherapy practice are described , among these steps they it continued it plows to request the qualified personnel's yams, the operation authorization, application purpose, license type

  9. Current status of the PBMR licensing project

    International Nuclear Information System (INIS)

    Mysen, A.; Clapisson, G.A.; Metcalf, P.E.

    2000-01-01

    The CNS is currently reviewing the PBMR conceptual design from a licensibility point of view. The PBMR concept is based on a High Temperature Gas Cooled Reactor - pebble bed reactor type. It is anticipated that the PBMR design will rely on inherent safety characteristics to contain fission products within fuel over the full range of design basis events. This feature combined with the high temperature integrity of the fuel and structural graphite, allows the safe use of a high coolant temperature, which allows consideration of the future development of this reactor for non-electrical applications of nuclear heat for industrial use. The CNS licensing approach requires that the licensing and design basis of the plant should respect prevailing international norms and practices and that a quantitative risk assessment should demonstrate compliance with the CNS fundamental safety standards. The first stage of the licensing process is now ongoing; this is a pre-application phase, which will result in a statement on licensibility being issued. Identification of the specific documentation requirements and information needed is required across every step of the licensing process. Top level regulatory requirements have been established for the PBMR. They include the CNS fundamental safety standard and basic licensing criteria, which describes requirements on licensees of nuclear installations regarding risk assessment and compliance with the safety criteria and define classification of licensing basis events. (author)

  10. USNRC licensing process as related to nuclear criticality safety

    International Nuclear Information System (INIS)

    Ketzlach, N.

    1987-01-01

    The U.S. Code of Federal Regulations establishes procedures and criteria for the issuance of licenses to receive title to, own, acquire, deliver, receive, possess, use, and initially transfer special nuclear material; and establishes and provides for the terms and conditions upon which the Nuclear Regulatory Commission (NRC) will issue such licenses. Section 70.22 of the regulations, ''Contents of Applications'', requires that applications for licenses contain proposed procedures to avoid accidental conditions of criticality. These procedures are elements of a nuclear criticality safety program for operations with fissionable materials at fuels and materials facilities (i.e., fuel cycle facilities other than nuclear reactors) in which there exists a potential for criticality accidents. To assist the applicant in providing specific information needed for a nuclear criticality safety program in a license application, the NRC has issued regulatory guides. The NRC requirements for nuclear criticality safety include organizational, administrative, and technical requirements. For purely technical matters on nuclear criticality safety these guides endorse national standards. Others provide guidance on the standard format and content of license applications, guidance on evaluating radiological consequences of criticality accidents, or guidance for dealing with other radiation safety issues. (author)

  11. Organisational IT managed from the shop floor

    DEFF Research Database (Denmark)

    Bolmsten, Johan; Dittrich, Yvonne

    2015-01-01

    Modern organisations need to be able to adjust to changes in the environment, changes which are ever more rapid, and in doing so capitalise on the creativity and innovations of their employees. As suggested by Boulus-Rødje and Bjørn (Chap. 14), information technology (IT) applications today...... are likely to take the form of complex, integrated infrastructures, supporting collaboration within and across organisations. This places requirements on the IT infrastructure. As the work practices within an organisation change, the supporting infrastructure also needs to evolve....

  12. 76 FR 40905 - Turnagain Arm Tidal Electric Energy Project; Notice of Intent To File License Application, Filing...

    Science.gov (United States)

    2011-07-12

    ... Tidal Electric Energy Project; Notice of Intent To File License Application, Filing of Pre-Application....: 13509-001. c. Dated Filed: May 11, 2011. d. Submitted By: Turnagain Arm Tidal Energy Corporation. e. Name of Project: Turnagain Arm Tidal Electric Energy Project. f. Location: Of the Upper Cook Inlet off...

  13. 77 FR 58370 - Pennamaquan Tidal Power LLC; Notice of Intent To File License Application, Filing of Pre...

    Science.gov (United States)

    2012-09-20

    ... Tidal Power LLC; Notice of Intent To File License Application, Filing of Pre-Application Document (PAD... Filed: July 19, 2012. d. Submitted By: Pennamaquan Tidal Power LLC (Pennamaquan Power). e. Name of Project: Pennamaquan Tidal Power Plant Project. f. Location: On the Pennamaquan River at the entrance to...

  14. 78 FR 29393 - University of Missouri-Columbia Facility Operating License No. R-103

    Science.gov (United States)

    2013-05-20

    ... Facility Operating License No. R-103 AGENCY: Nuclear Regulatory Commission. ACTION: License renewal... the renewal of Facility Operating License No. R-103 (``Application''), which currently authorizes the... application for the renewal of Facility Operating License No. R-103, which, currently authorizes the licensee...

  15. 47 CFR 25.113 - Station licenses and launch authority.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Station licenses and launch authority. 25.113 Section 25.113 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses General Application Filing Requirements § 25.113 Station...

  16. Application of probabilistic risk assessment in nuclear and environmental licensing processes of nuclear reactors in Brazil

    International Nuclear Information System (INIS)

    Mata, Jonatas F.C. da; Vasconcelos, Vanderley de; Mesquita, Amir Z.

    2015-01-01

    The nuclear accident at Fukushima Daiichi, occurred in Japan in 2011, brought reflections, worldwide, on the management of nuclear and environmental licensing processes of existing nuclear reactors. One of the key lessons learned in this matter, is that the studies of Probabilistic Safety Assessment and Severe Accidents are becoming essential, even in the early stage of a nuclear development project. In Brazil, Brazilian Nuclear Energy Commission, CNEN, conducts the nuclear licensing. The organism responsible for the environmental licensing is Brazilian Institute of Environment and Renewable Natural Resources, IBAMA. In the scope of the licensing processes of these two institutions, the safety analysis is essentially deterministic, complemented by probabilistic studies. The Probabilistic Safety Assessment (PSA) is the study performed to evaluate the behavior of the nuclear reactor in a sequence of events that may lead to the melting of its core. It includes both probability and consequence estimation of these events, which are called Severe Accidents, allowing to obtain the risk assessment of the plant. Thus, the possible shortcomings in the design of systems are identified, providing basis for safety assessment and improving safety. During the environmental licensing, a Quantitative Risk Analysis (QRA), including probabilistic evaluations, is required in order to support the development of the Risk Analysis Study, the Risk Management Program and the Emergency Plan. This article aims to provide an overview of probabilistic risk assessment methodologies and their applications in nuclear and environmental licensing processes of nuclear reactors in Brazil. (author)

  17. Application of probabilistic risk assessment in nuclear and environmental licensing processes of nuclear reactors in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Mata, Jonatas F.C. da; Vasconcelos, Vanderley de; Mesquita, Amir Z., E-mail: jonatasfmata@yahoo.com.br, E-mail: vasconv@cdtn.br, E-mail: amir@cdtn.br [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2015-07-01

    The nuclear accident at Fukushima Daiichi, occurred in Japan in 2011, brought reflections, worldwide, on the management of nuclear and environmental licensing processes of existing nuclear reactors. One of the key lessons learned in this matter, is that the studies of Probabilistic Safety Assessment and Severe Accidents are becoming essential, even in the early stage of a nuclear development project. In Brazil, Brazilian Nuclear Energy Commission, CNEN, conducts the nuclear licensing. The organism responsible for the environmental licensing is Brazilian Institute of Environment and Renewable Natural Resources, IBAMA. In the scope of the licensing processes of these two institutions, the safety analysis is essentially deterministic, complemented by probabilistic studies. The Probabilistic Safety Assessment (PSA) is the study performed to evaluate the behavior of the nuclear reactor in a sequence of events that may lead to the melting of its core. It includes both probability and consequence estimation of these events, which are called Severe Accidents, allowing to obtain the risk assessment of the plant. Thus, the possible shortcomings in the design of systems are identified, providing basis for safety assessment and improving safety. During the environmental licensing, a Quantitative Risk Analysis (QRA), including probabilistic evaluations, is required in order to support the development of the Risk Analysis Study, the Risk Management Program and the Emergency Plan. This article aims to provide an overview of probabilistic risk assessment methodologies and their applications in nuclear and environmental licensing processes of nuclear reactors in Brazil. (author)

  18. TMI-related requirements for new operating licenses. Technical report

    International Nuclear Information System (INIS)

    1980-06-01

    There are four types of TMI-related requirements and actions approved by the Commission for new operating licenses: (1) those required to be completed by a license applicant prior to receiving a fuel-loading and low-power testing license, (2) those required to be completed by a license applicant prior to receiving a license to operate at appreciable power levels up to full power, (3) those the NRC will take prior to issuing a fuel-loading and low-power testing or a full-power operating license, and (4) those required to be completed by a licensee prior to a specified date. In this report, only those dated requirements that have already been issued are of interest. Other dated requirements are expected to be issued in the future as work progresses in accordance with the TMI Action Plan. This report summarizes the several parts of the list of TMI-related requirements approved by the Commission for new operating licenses

  19. Proceedings of the CNRA Workshop on New Reactor Siting, Licensing and Construction Experience

    International Nuclear Information System (INIS)

    2011-01-01

    This report documents the proceedings from the 'Workshop on New Reactor Siting, Licensing and Construction Experience', held in Prague, Czech Republic on 15-17 September 2010. A total of 59 specialists from 16 countries and international organisations attended. The Meeting was sponsored by the OECD Nuclear Energy Agency Committee on Nuclear Regulatory Activities and hosted by the State Office for Nuclear Safety (SUJB) in Czech Republic. The objectives of the workshop were to review and discuss recent and past construction experience lessons learned including perspectives from regulatory authorities, as well as vendors, and licensee. The workshop addressed issues associated with project management resources including: a) overall human resources, expertise, experience and organisation available to the licensee, b) capability of each potential vendor (in-house knowledge and skills versus planned subcontracting and subcontractor management). The workshop also discussed the lessons learned in the regulation of site selection, evaluation and site preparation as well as the review of regulatory practices for the licensing of new reactors, including the regulatory body infrastructure, staffing and expertise needed. The workshop provided an excellent opportunity to communicate recent experience on these topics to a wider audience, including participants from OECD member countries as well as New Entrants from non-OECD member countries. The workshop allowed the WGRNR group to introduce and discuss the current programme of work and products under development in order to gain insights from workshop participants on each of the programme of work areas, and get feedback on additional focus areas. The workshop was structured in 4 technical sessions, each followed by ample time for panel discussions. The first technical session was devoted to presentations of the licensing process for new reactors followed by different member countries. The second technical session was

  20. 76 FR 81992 - PPL Bell Bend, LLC; Combined License Application for Bell Bend Nuclear Power Plant; Exemption

    Science.gov (United States)

    2011-12-29

    ... License Application for Bell Bend Nuclear Power Plant; Exemption 1.0 Background PPL Bell Bend, LLC... for Nuclear Power Plants.'' This reactor is to be identified as Bell Bend Nuclear Power Plant (BBNPP... based upon the U.S. EPR reference COL (RCOL) application for UniStar's Calvert Cliffs Nuclear Power...

  1. The process of organisational adaptation through innovations, and organisational adaptability

    OpenAIRE

    Tikka, Tommi

    2010-01-01

    This study is about the process of organisational adaptation and organisational adaptability. The study generates a theoretical framework about organisational adaptation behaviour and conditions that have influence on success of organisational adaptation. The research questions of the study are: How does an organisation adapt through innovations, and which conditions enhance or impede organisational adaptation through innovations? The data were gathered from five case organisations withi...

  2. Non-Power Reactor Operator Licensing Examiner Standards. Revision 1

    International Nuclear Information System (INIS)

    1995-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  3. Non-Power Reactor Operator Licensing Examiner Standards. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience.

  4. 78 FR 64493 - Juneau Hydropower, Inc.; Notice of Subsequent Draft License Application (DLA) and Draft...

    Science.gov (United States)

    2013-10-29

    ... Hydropower, Inc.; Notice of Subsequent Draft License Application (DLA) and Draft Preliminary Draft... Hydropower, Inc. e. Name of Project: Sweetheart Lake Hydroelectric Project. f. Location: At the confluence of..., Business Manager, Juneau Hydropower, Inc., P.O. Box 22775, Juneau, AK 99802; 907-789-2775, email: duff...

  5. 76 FR 53693 - Notice of Invitation To Participate; Coal Exploration License Application COC-74911, Colorado

    Science.gov (United States)

    2011-08-29

    ...] Notice of Invitation To Participate; Coal Exploration License Application COC-74911, Colorado AGENCY: Bureau of Land Management, Interior. ACTION: Notice. SUMMARY: Pursuant to the Mineral Leasing Act of 1920... America in lands located in Delta County, Colorado. DATES: This notice of invitation was published in the...

  6. 15 CFR 732.4 - Steps regarding License Exceptions.

    Science.gov (United States)

    2010-01-01

    ... General Prohibition Six (Embargo), consult part 746 of the EAR for applicable License Exceptions. (b... export or reexport is subject to General Prohibition Six (Embargo) for embargoed destinations, License...

  7. Organisational values and organisational commitment: do nurses' ethno-cultural differences matter?

    Science.gov (United States)

    Hendel, Tova; Kagan, Ilya

    2014-05-01

    To examine the association between perceived organisational values and organisational commitment among Israeli nurses in relation to their ethno-cultural background. Differences and the discrepancy between individuals' organisational values and those of their organisational culture are a potential source of adjustment difficulties. Organisational values are considered to be the bond of the individual to their organisation. In multicultural societies, such as Israel, the differences in perception of organisational values and organisational commitment may be reflected within workgroups. Data were collected using a questionnaire among 106 hospital nurses. About 59.8% of the sample were Israeli-born. A positive correlation was found between organisational values and organisational commitment. Significant differences were found in organisational values and organisational commitment between Israeli-born-, USSR-born- and Ethiopian-born nurses. The socio-demographic profile modified the effect of organisational values on organisational commitment: when the nurse was male, Muslim, religiously orthodox and without academic education, the effect of organisational values on organisational commitment was higher. Findings confirm the role of culture and ethnicity in the perception of organisational values and the level of organisational commitment among nurses. Assessing ethno-cultural differences in organisational values and organisational commitment provides a fuller understanding of nurses' ability to adjust to their work environment and helps nurse managers devise means to increase nurses' commitment. © 2012 John Wiley & Sons Ltd.

  8. 48 CFR 1852.227-86 - Commercial computer software-Licensing.

    Science.gov (United States)

    2010-10-01

    .../contractor proposes its standard commercial software license, those applicable portions thereof consistent... its standard commercial software license until after this purchase order/contract has been issued, or at or after the time the computer software is delivered, such license shall nevertheless be deemed...

  9. Organisational Art

    DEFF Research Database (Denmark)

    Ferro-Thomsen, Martin

    creation of a practical utopia (?heterotopia?) in the organisational context. The case study makes use of both art- and organisational theory. The thesis concludes with an outline of a framework for OA that is derived from contemporary theory of mainly Relational Aesthetics (Bourriaud), Conceptual Art......University of Copenhagen / Learning Lab Denmark. 2005 Kort beskrivelse: Organisational Art is a tentative title for an art form that works together with organisations to produce art. This is most often done together with non-artist members of the organisation and on-site in their social context. OA...... is characterised as socially engaged, conceptual, discursive, site-specific and contextual. Abstract: This investigation is about Organisational Art (OA), which is a tentative title for an art form that works together with organisations (companies, institutions, communities, governments and NGOs) to produce art...

  10. The safety case in support of the license application of the surface repository of low-level waste in Dessel, Belgium

    International Nuclear Information System (INIS)

    Wacquier, William; Cool, Wim

    2014-01-01

    The modern concept of the safety case, developed by the OECD/NEA for geological repositories of high- and medium-level waste has been successfully applied by ONDRAF/ NIRAS for a surface repository for Category A waste (i.e. low-level waste) in Belgium in the current project phase 2006-2012. This resulted in the submission on 31 January 2013 by ONDRAF/NIRAS of an application for a 'construction and operation license' to the safety authorities. The benefits of using the notion of the safety case have been that: i) safety has been incorporated in an integrated manner within all assessment basis, design and safety assessment activities; ii) the process of development of the license application has gained in clarity and traceability; iii) the documentation of the license application contains multiple lines of argumentation for safety rather than argumentation based only on quantitative radiological impact calculations. To offer a comprehensive view on the safety argumentation and its development, it has been found useful to develop the argumentation not only along a safety statements structure but also along the safety report structure. (authors)

  11. INTERNAL HAZARDS ANALYSIS FOR LICENSE APPLICATION

    Energy Technology Data Exchange (ETDEWEB)

    R.J. Garrett

    2005-02-17

    The purpose of this internal hazards analysis is to identify and document the internal hazards and potential initiating events associated with preclosure operations of the repository at Yucca Mountain. Internal hazards are those hazards presented by the operation of the facility and by its associated processes that can potentially lead to a radioactive release or cause a radiological hazard. In contrast to external hazards, internal hazards do not involve natural phenomena and external man-made hazards. This internal hazards analysis was performed in support of the preclosure safety analysis and the License Application for the Yucca Mountain Project. The methodology for this analysis provides a systematic means to identify internal hazards and potential initiating events that may result in a radiological hazard or radiological release during the repository preclosure period. These hazards are documented in tables of potential internal hazards and potential initiating events (Section 6.6) for input to the repository event sequence categorization process. The results of this analysis will undergo further screening and analysis based on the criteria that apply to the performance of event sequence analyses for the repository preclosure period. The evolving design of the repository will be re-evaluated periodically to ensure that internal hazards that have not been previously evaluated are identified.

  12. INTERNAL HAZARDS ANALYSIS FOR LICENSE APPLICATION

    International Nuclear Information System (INIS)

    Garrett, R.J.

    2005-01-01

    The purpose of this internal hazards analysis is to identify and document the internal hazards and potential initiating events associated with preclosure operations of the repository at Yucca Mountain. Internal hazards are those hazards presented by the operation of the facility and by its associated processes that can potentially lead to a radioactive release or cause a radiological hazard. In contrast to external hazards, internal hazards do not involve natural phenomena and external man-made hazards. This internal hazards analysis was performed in support of the preclosure safety analysis and the License Application for the Yucca Mountain Project. The methodology for this analysis provides a systematic means to identify internal hazards and potential initiating events that may result in a radiological hazard or radiological release during the repository preclosure period. These hazards are documented in tables of potential internal hazards and potential initiating events (Section 6.6) for input to the repository event sequence categorization process. The results of this analysis will undergo further screening and analysis based on the criteria that apply to the performance of event sequence analyses for the repository preclosure period. The evolving design of the repository will be re-evaluated periodically to ensure that internal hazards that have not been previously evaluated are identified

  13. 77 FR 48130 - Prospective Grant of Exclusive Patent License

    Science.gov (United States)

    2012-08-13

    ... Exclusive Patent License AGENCY: National Institute of Standards and Technology, Commerce. ACTION: Notice of prospective grant of exclusive patent license. SUMMARY: This is a notice in accordance with 35 U.S.C. 209(e... Provisional Application for Patent Application No. 61,638,362 titled ``Flow Cytometer Systems and Associated...

  14. Aging management review for license renewal and plant life management

    International Nuclear Information System (INIS)

    Rinckel, M.A.; Young, G.G.

    2002-01-01

    Full text: United States nuclear power plants are initially licensed for a period of 40-years. The 40-year term, which was established by the Atomic Energy Commission in the 1950s, is believed to be based on engineering judgement and is consistent with the typical amortization schedule for purchasing fossil power plants. Under 10 CFR Part 54, the license renewal rule, additional terms of 20-years may be obtained through the preparation of a license renewal application that must be reviewed and approved by the Nuclear Regulatory Commission (NRC). The license renewal rule requires that applicants perform ageing management reviews on passive long-lived structures and components to demonstrate that ageing will be managed during the period of extended operation (i.e., additional 20 years of operation). ageing of active components, which are excluded from 10 CFR Part 54, is accomplished through the Maintenance Rule, 10 CFR Part 65, using performance-based monitoring. The license renewal rule, 10 CFR Part 54, was initially published in 1991. After significant interaction with the nuclear industry from 1991 through 1994, the NRC revised the rule in 1995 to focus on passive long-lived structures and components. In 1998, the first two applications for license renewal were submitted to the NRC by Baltimore Gas and Electric for the two-unit Calvert Cliffs nuclear power plant and by Duke Energy for the three-unit Oconee nuclear power plant. In March 2000, the NRC approved the application for the two-unit Calvert Cliffs nuclear power plant for an additional 20 years. Two months later, the NRC approved the renewal of the operating licenses for the three-unit Oconee nuclear station. The NRC completed these reviews in a timely, predictable, and stable manner. As of February 2002, the NRC has approved renewal of operating licenses for eight nuclear units and has applications under review for 15 more units. Twelve additional companies have notified the NRC of their intention to seek

  15. NPP License Renewal and Aging Management: Revised Guidance

    International Nuclear Information System (INIS)

    Hull, A.B.; Hiser, A.L.; Lindo-Talin, S.E.

    2012-01-01

    Based on the Atomic Energy Act, the NRC issues licenses for commercial power reactors to operate for up to 40 years and allows these licenses to be renewed for up to another 20 years. NRC has approved license renewal (LR) for well over 50% of U.S. located reactors originally licensed to operate for 40 years. Of these 104 reactors (69 PWRs, 35 BWRs), the NRC has issued renewed licenses for 71 units and is currently reviewing applications for another 15 units. As of May 1, 2012, ten plants at nine sites had entered their 41st year of operation and thus are in their first period of extended operation (PEO). Five more plants will enter the PEO by the end of 2012. One foundation of the license renewal process has been license renewal guidance documents (LRGDs). The U.S. Nuclear Regulatory Commission (NRC) revised key guidance documents used for nuclear power LR in 2010 and 2011. These include NUREG-1800, 'Standard Review Plan for Review of License Renewal Applications,' revision 2 (SRP-LR), and NUREG-1801, 'Generic Aging Lessons Learned (GALL) Report,' revision 2 (GALL Report). The guidance documents were updated to reflect lessons learned and operating experience gained since the guidance documents were last issued in 2005. The reactor LRGDs referenced in this poster can all be accessed at http://www.nrc.gov/reactors/operating/licensing/renewal/guidance.html (author)

  16. Organising aspects of the Levels Added Organisation (LAO

    Directory of Open Access Journals (Sweden)

    Duško Uršič

    2002-01-01

    Full Text Available How to achieve a more efficient, more successful, and above all more competitive organisation in the given environment and equal spare time in everything? One of responses is evidently hidden in the levels added organisation concept, which has already proved its advantages in some domains practice, and now we also try to define and explain them from the organisational and scientific aspect. As briefly presented in this paper, the nucleus is hidden in the evolutionary development of the organisation that adopts innovations, then tests and evaluates them, combines and upgrades them, and consequently it efficiently resolves difficulties of existent organisational concepts.

  17. 77 FR 23241 - Lock+ Hydro Friends Fund XXX, LLC; Notice of Intent To File License Application, Filing of Pre...

    Science.gov (United States)

    2012-04-18

    ... Friends Fund XXX, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document.... Date Filed: February 20, 2012. d. Submitted By: Lock+ Hydro Friends Fund XXX, LLC. e. Name of Project... Applicant Contact: Mr. Mark R. Stover, Lock+\\TM\\ Hydro Friends Fund XXX, c/o Hydro Green Energy, LLC, 900...

  18. Overview of the Yucca Mountain Licensing Process

    International Nuclear Information System (INIS)

    M. Wisenburg

    2004-01-01

    This paper presents an overview of the licensing process for a Yucca Mountain repository for high-level radioactive waste and spent nuclear fuel. The paper discusses the steps in the licensing proceeding, the roles of the participants, the licensing and hearing requirements contained in the Code of Federal Regulations. A description of the Nuclear Regulatory Commission (NRC) staff acceptance and compliance reviews of the Department of Energy (DOE) application for a construction authorization and a license to receive and possess high-level radioactive waste and spent nuclear fuel is provided. The paper also includes a detailed description of the hearing process

  19. Class I structures license renewal industry report; revision 1. Final report

    International Nuclear Information System (INIS)

    Deng, D.; Renfro, J.; Statton, J.

    1994-07-01

    The U.S. nuclear power industry, through coordination by the Nuclear Management and Resources Council (NUMARC), and sponsorship by the U.S. Department of Energy (DOE) and the Electric Power Research Institute (EPRI), has evaluated age-related degradation effects for a number of major plant systems, structures, and components, in the license renewal technical Industry Reports (IRs). License renewal applicants may choose to reference these IRs in support of their plant-specific license renewal applications, as an equivalent to the integrated plant assessment provisions of the license renewal rule (10 CFR Part 54). This IR provides the technical basis for license renewal for U.S. nuclear power plant Class I structures, with the IR evaluating which structures are Class I. Seventeen structures are explicitly described and evaluated in this IR. These structures are not necessarily classified as Class I at all plants, therefore the license renewal applicant should consult this IR for correct identification

  20. 46 CFR 515.14 - Issuance and use of license.

    Science.gov (United States)

    2010-10-01

    ... will issue a license only in the name of the applicant, whether the applicant is a sole proprietorship, a partnership, or a corporation. A license issued to a sole proprietor doing business under a trade name shall be in the name of the sole proprietor, indicating the trade name under which the licensee...

  1. Safety evaluation status report for the prototype license application safety analysis report

    International Nuclear Information System (INIS)

    1989-07-01

    The US Nuclear Regulatory Commission (NRC) staff and consultants reviewed a Prototype License Application Safety Analysis Report (PLASAR) submitted by the US Department of Energy (DOE) for the earth-mounded concrete bunker (EMCB) alternative method of low-level radioactive waste disposal. The NRC reviewers relied extensively on the Standard Review Plan (SRP), Rev.1 (NUREG-1200), to evaluate the acceptability of the information provided in the EMCB PLASAR. The NRC staff selected certain review areas in the PLASAR for development of safety evaluation report input to provide examples of safety assessments that are necessary as part of a licensing review. Because of the fictitious nature of the assumed disposal site, and the decision to limit the review to essentially first-round review status, the NRC staff report is labeled a ''Safety Evaluation Status Report'' (SESR). Appendix A comprises the NRC review comments and questions on the information that DOE submitted in the PLASAR. The NRC concentrated its review on the design and operations-related portions of the EMCB PLASAR

  2. Development of radioactive waste management licensing review assistant

    International Nuclear Information System (INIS)

    Loa, W.W.; Chen, S.; Yu, W.C.; Peng, C.M.; Huang, C.L.; Lin, C.

    1992-01-01

    Regulations on radioactive waste disposal are now in urgent need due to our increasing consumption of electric power from nuclear origin. It is set forth that actually applying the regulations to evaluate the license application of new repositories for interim storage and final disposal fo High-Level Waste and Low-Level Waste before the year of 2000. In the mean time, it is expected to establish the basis for the decision on issuing the license. The license review procedure can be very complicated because too many factors must be taken into consideration. However, to maintain a more efficient, accurate, and systematic review procedure, and at the same time to reduce costs, the Artificial Intelligence (AI) techniques may be used. An expert system is designed as a radioactive waste management licensing review aid for the staff those are in charge of the license application. Tasks such as completeness checking, functional areas of review distribution, participation confirmation, knowledge acquisition, review comment collection, weighting calculation, and degree of satisfaction are considered. In this paper the authors will discuss the development of the radioactive waste management licensing review assistant

  3. Nuclear relevant installations licensing methodology in the Argentine Republic

    International Nuclear Information System (INIS)

    Paganini, C.E.

    1986-01-01

    A review of the requeriments of the Nuclear Installations Advisory Committee on Licensing (CALIN) from the nuclear security point of view, is presented. The methodology applied by the CALIN for the licensing in the Argentine Republic is included as well as codes, standards of applications and the interaction between the licensing Authority and the Responsible Entity during the whole process. Finally, the Atucha II nuclear power plant's licensing, in construction at present, is explained and the standard, of the licensing schedule, is presented graphically. (author) [es

  4. Regulatory assessment of safety culture in nuclear organisations - current trends and challenges

    International Nuclear Information System (INIS)

    Tronea, M.

    2010-01-01

    The paper gives an overview of the current practices in the area of regulatory assessment of safety culture in nuclear organisations and of the associated challenges. While the assessment and inspection procedures currently in use by regulatory authorities worldwide are directed primarily at verifying compliance with the licensing basis, there is a recognised need for a more systematic approach to the identification, collection and review of data relevant to the safety culture in licensees' organisations. The paper presents a proposal for using the existing regulatory inspection practices for gathering information relevant to safety culture and for assessing it in an integrated manner. The proposal is based on the latest requirements and guidance issued by the International Atomic Energy Agency (IAEA) on management systems for nuclear facilities and activities, particularly as regards the attributes needed for a strong nuclear safety culture. (author)

  5. New Reactor Siting, Licensing and Construction Experience. Proceedings of the 2. CNRA International Workshop on 'New Reactor Siting, Licensing and Construction Experience'

    International Nuclear Information System (INIS)

    2013-01-01

    This report documents the proceedings from the 2. Workshop on New Reactor Siting, Licensing and Construction Experience. A total of 45 specialists from 16 countries and international organisations attended. The meeting was sponsored by the OECD Nuclear Energy Agency Committee on Nuclear Regulatory Activities and hosted by the US Nuclear Regulatory Commission (U.S.NRC). The objectives of the workshop were to provide a forum to exchange information on lessons learned from siting, licensing and constructing new nuclear power plants around the world. Key focus areas included siting practices and regulatory positions that have been enhanced as a result of the Fukushima accident; lessons learned from licensing and design review approaches and challenges, construction experience and recommendations for regulatory oversight; and regulatory cooperation on generic and design specific issues through the MDEP specific working groups. The workshop was structured in 4 technical sessions, each followed by ample time for panel discussions. The first technical session was devoted to regulatory cooperation on generic and design specific issues, MDEP working groups (EPR, AP1000), vendor inspection co-operation, digital I and C, and codes and standards. The second technical session was intended to discuss and share regulatory positions on siting practices and enhancements as a result of lessons learned from Fukushima accident. The third technical session addressed the construction experience and regulatory oversight of new reactor construction activities. And the fourth technical session included presentations on the lessons learned from regulatory licensing reviews of new reactor designs

  6. Licensing safety critical software

    International Nuclear Information System (INIS)

    Archinoff, G.H.; Brown, R.A.

    1990-01-01

    Licensing difficulties with the shutdown system software at the Darlington Nuclear Generating Station contributed to delays in starting up the station. Even though the station has now been given approval by the Atomic Energy Control Board (AECB) to operate, the software issue has not disappeared - Ontario Hydro has been instructed by the AECB to redesign the software. This article attempts to explain why software based shutdown systems were chosen for Darlington, why there was so much difficulty licensing them, and what the implications are for other safety related software based applications

  7. The U.S. Nuclear Regulatory Commission's antitrust review of nuclear power plants: the conditioning of licenses

    International Nuclear Information System (INIS)

    Penn, D.W.; Delaney, J.B.; Honeycutt, T.C.

    1976-04-01

    The 1970 amendments to Section 105 of the Atomic Energy Act require the Nuclear Regulatory Commission to conduct a prelicensing antitrust review of applications for licenses to construct and operate nuclear power plants. The Commission must make a finding as to whether the granting of a license 'would create or maintain a situation inconsistent with the antitrust laws,' and it has the authority to issue or continue a license, to refuse to issue a license, to rescind or amend a license, and to issue a license with conditions that it deems appropriate. This report provides information about the antitrust license conditions that have resulted from the NRC's antitrust review process. The process itself is described and a catalog of the applications requiring antitrust license conditions is presented. For each application, the license conditions are put into the general categories of unit access, transmission services, coordination, and contractual provisions. For completeness, the report also catalogs applications requiring no antitrust license conditions, and lists applications that were exempted from the 1970 amendments, are the subject of litigation, or have been withdrawn

  8. May compact storage facilities be licensed

    International Nuclear Information System (INIS)

    Gleim, A.; Winter, G.

    1980-01-01

    The authors examine as potential statements fo fact for licensing so-called compact storage facilities for spent fuel elements Sec. 6 to 9c of the German Atomic Energy Act and Sec. 4 of the German Radiation Protection Ordinance. They find that none of these provisions were applicable to compact stroage facilities. In particular, the storage of spent fuel elements was no storage of nuclear fuels licensable under Sec. 6 of the Atomic Energy Act, because Sec. 6 did not cover spent fuel elements. Also in the other wording of the Atomic Energy Act there was no provision, which could be used as a statement of fact for licensing compact storage facilities. Such facilities could not be licensed and, for that reason, were not permitted. (IVR) [de

  9. Standard format and content for the physical protection section of a license application (for facilities other than nuclear power plants)

    International Nuclear Information System (INIS)

    1976-06-01

    The document presented has been prepared as an aid to uniformity and completeness in the preparation and review of the physical protection section of license applications. It is applicable to fuel reprocessing plants, fuel manufacturing plants, SNM tranportation, or other special nuclear material operations involving the possession and use of uranium 235 (contained in uranium enriched to 20 percent or more in the U-235 isotope), uranium 233, or plutonium alone or in any combination in a quantity of 5000 grams or more computed by the formula: grams = (grams contained U-235) + 2.5 (grams U-233 + grams plutonium). The document is not intended to be used for nuclear power plants. The information specified is the minimum needed for a license application. Additional information may be required for completion of the staff review of a particular application

  10. Sinonasal organised haematoma: clinical features and successful application of modified transnasal endoscopic medial maxillectomy.

    Science.gov (United States)

    Suzuki, M; Nakamura, Y; Ozaki, S; Yokota, M; Murakami, S

    2017-08-01

    Although organised haematoma often induces bone thinning and destruction similar to malignant diseases, the aetiology of organised haematoma and the optimal treatment remain unclear. This paper presents the clinical features of individuals with organised haematoma, and describes cases in which a novel modified approach was successfully applied for resection of organised haematoma in the maxillary sinus. Pre-operative examination data were evaluated retrospectively. Modified transnasal endoscopic medial maxillectomy was employed. Fourteen patients with organised haematoma were treated. Contrast-enhanced computed tomography showed heterogeneous enhancement in all patients. Eight patients underwent modified transnasal endoscopic medial maxillectomy, without complications such as facial numbness, tooth numbness, facial tingling, lacrimation and eye discharge. Dissection of the apertura piriformis and anterior maxillary wall was not necessary for any of these eight patients. No recurrence was observed. Pre-operative examinations can be helpful in determining the likelihood of organised haematoma. Modified transnasal endoscopic medial maxillectomy appears to be a safe and effective method for organised haematoma resection.

  11. Standard format and content of license applications for plutonium processing and fuel fabrication plants

    International Nuclear Information System (INIS)

    1976-01-01

    The standard format suggested for use in applications for licenses to possess and use special nuclear materials in Pu processing and fuel fabrication plants is presented. It covers general description of the plant, summary safety assessment, site characteristics, principal design criteria, plant design, process systems, waste confinement and management, radiation protection, accident safety analysis, conduct of operations, operating controls and limits, and quality assurance

  12. NRC licensing requirements: DOD options

    International Nuclear Information System (INIS)

    Pike, W.J.; O'Reilly, P.D.

    1982-09-01

    This report describes the licensing process (both safety and environmental) that would apply if the Department of Defense (DOD) chooses to obtain licenses from the US Nuclear Regulatory Commission (NRC) for using nuclear energy for power and luminous sources. The specific nuclear energy sources being considered include: small or medium-size nuclear power reactors; radioisotopic thermoelectric generators with 90 Sr or 238 Pu; radioisotopic dynamic electric generators with 90 Sr or 238 Pu; and applications of radioisotopes for luminous sources (lights) with 3 H, 85 Kr, or 147 Pm. The steps of the licensing process are summarized in the following sections, with particular attention given to the schedule and level of effort necessary to support the process

  13. 75 FR 51451 - Erie Boulevard Hydropower, L.P.; Notice of Intent To File License Application, Filing of Pre...

    Science.gov (United States)

    2010-08-20

    ... Hydropower, L.P.; Notice of Intent To File License Application, Filing of Pre-Application Document, and.... Project No.: 7320-040. c. Dated Filed: June 29, 2010. d. Submitted By: Erie Boulevard Hydropower, L.P. e...: John Mudre at (202) 502-8902; or e-mail at [email protected] . j. Erie Boulevard Hydropower, L.P...

  14. 45 CFR 1321.75 - Licenses and safety.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Licenses and safety. 1321.75 Section 1321.75... AND COMMUNITY PROGRAMS ON AGING Service Requirements § 1321.75 Licenses and safety. The State shall... that the facility complies with all applicable State and local health, fire, safety, building, zoning...

  15. 76 FR 57720 - Intent To Grant an Exclusive Patent License

    Science.gov (United States)

    2011-09-16

    ... DEPARTMENT OF DEFENSE Department of the Air Force Intent To Grant an Exclusive Patent License... in: U.S. Patent Application No. 12/932,341, filed on February 23, 2011, entitled ``Resin-Based... INFORMATION CONTACT: An exclusive license for the invention described in this patent application will be...

  16. 75 FR 467 - Notice of Opportunity for Hearing, License Application Request of Powertech (USA) Inc. Dewey...

    Science.gov (United States)

    2010-01-05

    ... Hearing, License Application Request of Powertech (USA) Inc. Dewey-Burdock In Situ Uranium Recovery... Regulatory Commission (NRC) for the Dewey-Burdock In Situ Recovery Facility in Fall River and Custer Counties, South Dakota. The Dewey-Burdock facility would involve the recovery of uranium by in situ recovery (ISR...

  17. NUCLEAR SAFETY DESIGN BASES FOR LICENSE APPLICATION

    International Nuclear Information System (INIS)

    Garrett, R.J.

    2005-01-01

    The purpose of this report is to identify and document the nuclear safety design requirements that are specific to structures, systems, and components (SSCs) of the repository that are important to safety (ITS) during the preclosure period and to support the preclosure safety analysis and the license application for the high-level radioactive waste (HLW) repository at Yucca Mountain, Nevada. The scope of this report includes the assignment of nuclear safety design requirements to SSCs that are ITS and does not include the assignment of design requirements to SSCs or natural or engineered barriers that are important to waste isolation (ITWI). These requirements are used as input for the design of the SSCs that are ITS such that the preclosure performance objectives of 10 CFR 63.111 [DIRS 156605] are met. The natural or engineered barriers that are important to meeting the postclosure performance objectives of 10 CFR 63.113 [DIRS 156605] are identified as ITWI. Although a structure, system, or component (SSC) that is ITS may also be ITWI, this report is only concerned with providing the nuclear safety requirements for SSCs that are ITS to prevent or mitigate event sequences during the repository preclosure period

  18. Development of radioactive waste management licensing review assistant

    International Nuclear Information System (INIS)

    Wei-Whua Loa; Suan Chen; Wei-Chu Yu

    1992-01-01

    Regulations on radioactive waste disposal are now in urgent need due to our increasing consumption of electric power from nuclear origin. It is set forth that actually applying the regulations to evaluate the license application of new repositories for interim storage and final disposal of High-Level Waste and Low-Level Waste before the year of 2000. In the mean time, it is expected to establish the basis for the decision on issuing the license. The license review procedure can be very complicated, because too many factors must be taken into consideration. For the time being, licensing review is as much an art as it is a science. The authority usually faces three major problems; (1) the availability of domain expert, (2) maintaining of high quality and consistent reviews, and (3) the documentation of the review process. However, to maintain a more efficient, accurate, and systematic review procedure, and at the same time to reduce costs, the Artificial Intelligence (AI) techniques may be used. An expert system is designed as a radioactive waste management licensing review aid for the staff those are in charge of the license application. Tasks such as completeness checking, functional areas of review distribution, participation confirmation, knowledge acquisition, review comment collection, weighting calculation, and degree of satisfaction are considered. In this paper we will discuss the development of the radioactive waste management licensing review assistant

  19. Total System Performance Assessment-License Application Methods and Approach

    Energy Technology Data Exchange (ETDEWEB)

    J. McNeish

    2002-09-13

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issue (KTI) agreements, the ''Yucca Mountain Review Plan'' (CNWRA 2002 [158449]), and 10 CFR Part 63. This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are utilized in this document.

  20. AP1000R licensing and deployment in the United States

    International Nuclear Information System (INIS)

    Jordan, R. P.; Russ, P. A.; Filiak, P. P.; Castiglione, L. L.

    2012-01-01

    In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two new nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing actions directed

  1. Applying OR to problem situations within community organisations

    DEFF Research Database (Denmark)

    Tavella, Elena; Papadopoulos, Thanos

    2017-01-01

    This paper focuses on how the use of Community OR (COR), specifically Systems Thinking (ST) and the Viable System Model (VSM) can help in addressing complex and uncertain problem situations within community organisations, in particular Alternative Food Networks (AFNs). Literature has highlighted...... within a member-driven food cooperative in Copenhagen, Denmark, and the changes in decision making and the organisational structure of the cooperative. We illustrate the application of the VSM and in particular the methodology for organisational self-transformation within ‘localist green communitarianism......’ and ‘nonprofit management’ to tackle issues, enhance democratic and participative decision making, and changes in the organisational structure that foster coordination and cohesion. The implications for COR and Soft OR, limitations and future research directions are also provided....

  2. Development, assessment, licensing, and application of RELAP5YA at Yankee Atomic Electric Company

    International Nuclear Information System (INIS)

    Husain, A.

    1984-01-01

    Since 1975, Yankee Atomic Electric Company (YAEC) has been licensed to perform LOCA analyses (large and small breaks) for PWRs. The methods are based upon the WREM package, comprised of RELAP4-MOD 3, RELAP4-FLOOD, and TOODEE-2EM. Significant efforts were expended to compare WREM models against Appendix K criteria, and to incorporate changes for compliance with the criteria and for improved representation of LOCA phenomena. /SUP 2,3,4/ This internalized capability has been used extensively for licensing the Yankee and Maine Yankee plants, and for timely resolution of LOCA issues which frequently arose. The value of this internalized analysis capability was well recognized by the Yankee management. In 1979, Yankee embarked upon another LOCA Methods Development Program. One objective was to remove extra conservatisms inherent in older codes to provide additional operational flexibility for our plants. Also, we needed a code which could be used in a production mode to provide realistic response for off-normal conditions to be used in operator training and emergency guideline assessment. This program resulted in the development of RELAP5YA. The development, assessment, licensing, and application of RELAP5YA at YAEC is briefly described in this paper

  3. Leadership, organisational citizenship and innovative work ...

    African Journals Online (AJOL)

    Frederick Iraki

    Although organisational citizenship behaviour (OCB) and innovative work ... 'the intentional creation, introduction and application of new ideas within a work role, .... (the leader searches for deviations from rules and standards and takes ...

  4. 78 FR 14528 - Mayo Hydropower, LLC, Avalon Hydropower, LLC; Notice of Application for Transfer of License, and...

    Science.gov (United States)

    2013-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11169-029] Mayo Hydropower, LLC, Avalon Hydropower, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On November 20, 2012, Mayo Hydropower, LLC (transferor) and Avalon Hydropower...

  5. Licensing of safety critical software for nuclear reactors. Common position of seven European nuclear regulators and authorised technical support organisations

    International Nuclear Information System (INIS)

    2010-01-01

    It is widely accepted that the assessment of software cannot be limited to verification and testing of the end product, i.e. the computer code. Other factors such as the quality of the processes and methods for specifying, designing and coding have an important impact on the implementation. Existing standards provide limited guidance on the regulatory and safety assessment of these factors. An undesirable consequence of this situation is that the licensing approaches taken by nuclear safety authorities and by technical support organisations are determined independently with only limited informal technical co-ordination and information exchange. It is notable that several software implementations of nuclear safety systems have been marred by costly delays caused by difficulties in co-ordinating the development and qualification process. It was thus felt necessary to compare the respective licensing approaches, to identify where a consensus already exists, and to see how greater consistency and more mutual acceptance could be introduced into current practices. This report is the result of the work of a group of regulator and safety authorities' experts. The 2007 version was completed at the invitation of the Western European Nuclear Regulators' Association (WENRA). The major result of the work is the identification of consensus and common technical positions on a set of important licensing issues raised by the design and operation of computer based systems used in nuclear power plants for the implementation of safety functions. The purpose is to introduce greater consistency and more mutual acceptance into current practices. To achieve these common positions, detailed consideration was paid to the licensing approaches followed in the different countries represented by the experts of the task force. The report is intended to be useful: - to coordinate regulators' and safety experts' technical viewpoints in the design of regulators' national policies and in revisions

  6. Licensing of safety critical software for nuclear reactors. Common position of seven European nuclear regulators and authorised technical support organisations

    Energy Technology Data Exchange (ETDEWEB)

    2010-07-01

    It is widely accepted that the assessment of software cannot be limited to verification and testing of the end product, i.e. the computer code. Other factors such as the quality of the processes and methods for specifying, designing and coding have an important impact on the implementation. Existing standards provide limited guidance on the regulatory and safety assessment of these factors. An undesirable consequence of this situation is that the licensing approaches taken by nuclear safety authorities and by technical support organisations are determined independently with only limited informal technical co-ordination and information exchange. It is notable that several software implementations of nuclear safety systems have been marred by costly delays caused by difficulties in co-ordinating the development and qualification process. It was thus felt necessary to compare the respective licensing approaches, to identify where a consensus already exists, and to see how greater consistency and more mutual acceptance could be introduced into current practices. This report is the result of the work of a group of regulator and safety authorities' experts. The 2007 version was completed at the invitation of the Western European Nuclear Regulators' Association (WENRA). The major result of the work is the identification of consensus and common technical positions on a set of important licensing issues raised by the design and operation of computer based systems used in nuclear power plants for the implementation of safety functions. The purpose is to introduce greater consistency and more mutual acceptance into current practices. To achieve these common positions, detailed consideration was paid to the licensing approaches followed in the different countries represented by the experts of the task force. The report is intended to be useful: - to coordinate regulators' and safety experts' technical viewpoints in the design of regulators' national

  7. MEMO Organisation Modelling Language (1): Focus on organisational structure

    OpenAIRE

    Frank, Ulrich

    2011-01-01

    Organisation models are at the core of enterprise model, since they represent key aspects of a company's action system. Within MEMO, the Organisation Modelling Language (OrgML) supports the construction of organisation models. They can be divided into two main abstractions: a static abstraction is focusing on the structure of an organisation that reflects the division of labour with respect to static responsibilities and a dynamic abstraction that is focusing on models of business processes. ...

  8. Licensing of safety critical software for nuclear reactors. Common position of seven European nuclear regulators and authorised technical support organisations

    International Nuclear Information System (INIS)

    2007-01-01

    The major result of the work is the identification of consensus and common technical positions on a set of important licensing issues raised by the design and operation of computer-based systems used in Nuclear Power Plants for safety functions. The purpose is to introduce greater consistency and more mutual acceptance into current practices. To achieve these common positions, detailed consideration was paid to the licensing approaches followed in the different countries represented by the experts of the task force. The report is intended to be useful: - to coordinate regulators' and safety experts' technical viewpoints in the design of regulators' national policies and in revisions of guidelines; - as a reference in safety cases and demonstrations of safety of software based systems; - as guidance for system design specifications by manufacturers and major I and C suppliers on the international market. The task force decided at an early stage to focus attention on computer based systems used in Nuclear Power Plants for the implementation of safety functions; namely, those systems classified by the IAEA as 'Safety Systems'. Therefore, recommendations of this report - except those of chapter 1.11 - primarily address 'safety systems' and not 'safety related systems'. It was felt that the most difficult aspects of the licensing of digital programmable systems are rooted in the specific properties of the technology. The objective was therefore to delineate practical and technical licensing guidance, rather than discussing or proposing basic principles or requirements. The design requirements and the basic principles of nuclear safety in force in each member state are assumed to remain applicable. This report represents the consensus view achieved by the experts who contributed to the task force. It is the result of what was at the time of its initiation a first attempt at the international level to achieve consensus among nuclear regulators on practical methods for

  9. Brand alliance. Building block for scientific organisations´ marketing strategy

    Directory of Open Access Journals (Sweden)

    Joern Redler

    2016-03-01

    Full Text Available This paper addresses management issues of brand alliances as part of a scientific organisation´s marketing strategy. Though brand alliances have become quite popular with consumer products they seem to be exceptions in the marketing context of academic or scientific organisations. Against this background, the paper develops a brand alliance approach considering requirements of strategically marketing scientific organisations. As a starting point, brand alliances are discussed as a sub-category to brand combinations. Furthermore, opportunities for scientific organisations associated with the alliance approach are elucidated as well as, from a more general perspective, major threats. In the following course, the paper focuses on modelling a framework of customer-based brand alliance effects, referring to the behavioural science-based view of brands which conceptualises brands as the psychological reaction to the exposure of brand elements like a name, logo or symbols. In that context, prerequisites for success are examined as well. Further, essential components of a brand alliance management process are discussed and its application to scientific organisations is expounded. Aspects like, e.g., choosing and evaluating a partner brand, positioning a brand alliance or monitoring brand alliance performance are illuminated. In regard to practical application also factors and requirements for organisation´s brand alliance success are outlined.

  10. 78 FR 30914 - Grand River Dam Authority Notice of Application for Temporary Variance of License and Soliciting...

    Science.gov (United States)

    2013-05-23

    .... Description of Request: Grand River Dam Authority (GRDA) requests a temporary variance, for the year 2013, to... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1494-416] Grand River Dam Authority Notice of Application for Temporary Variance of License and Soliciting Comments, Motions To...

  11. Understanding human and organisational factors - Nuclear safety and at-risk organisations

    International Nuclear Information System (INIS)

    Bernard, Benoit

    2014-01-01

    This book addresses human and organisational factors which are present at different moments of the lifetime of an at-risk installation (from design to dismantling). At-risk organisations are considered as firstly human systems, and the objective is then to highlight individual and collective mechanisms in these organisations. Several questions are addressed, notably the origins of at-risk behaviour, and the reasons of the repetition of errors by these organisations. A first chapter, while referring to examples, addresses the human dimension of safety: human and organisational factors as obstacles, normal accidents (Three Mile Island), accidents in high-reliability organisations (Chernobyl), identification of root causes (Tokai-mura), and social-technical approach to safety (Fukushima). By also referring to examples, the second chapter addresses how to analyse at-risk organisations: individual behaviours (case of naval and air transport accidents), team coordination (a fire, the Challenger accident), and organisational regulation (organisations forms and routines, explosion of BP Texas City, explosion of Columbia)

  12. Organisational Structure

    Science.gov (United States)

    National Centre for Vocational Education Research (NCVER), 2006

    2006-01-01

    An understanding of organisational structure can provide guidance for organisations that want to change and innovate. Many writers agree that this understanding allows organisations to shape how their work is done to ultimately achieve their business goals--and that too often structure is given little consideration in business strategy and…

  13. Evaluation of a Mobile Learning Organiser for University Students

    Science.gov (United States)

    Corlett, Dan; Sharples, Mike; Bull, Susan; Chan, Tony

    2005-01-01

    This paper describes a 10-month trial of a mobile learning organiser, developed for use by university students. Implemented on a wireless-enabled Pocket PC hand-held computer, the organiser makes use of existing mobile applications as well as tools designed specifically for students to manage their learning. The trial set out to identify the…

  14. Total System Performance Assessment - License Application Methods and Approach

    International Nuclear Information System (INIS)

    McNeish, J.

    2003-01-01

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issues (KTIs) identified in agreements with the U.S. Nuclear Regulatory Commission, the ''Yucca Mountain Review Plan'' (YMRP), ''Final Report'' (NRC 2003 [163274]), and the NRC final rule 10 CFR Part 63 (NRC 2002 [156605]). This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are used in this document

  15. The Impact of Organisational Learning on Organisational Performance

    Directory of Open Access Journals (Sweden)

    Anna Zgrzywa-Ziemak

    2015-12-01

    Full Text Available Purpose: The aim of this article is to analyse the theoretical views and results of empirical research concerning the relation between organisational learning (OL and organisational performance (OP. Methodology: The study was carried out through extensive literature research, including relevant literature review from databases such as ProQuest, Elsevier, Emerald and EBSCO (the phrases: “organisational learning”, “learning organisation” and “organisational performance” were searched in the keywords, titles or abstracts. Findings: From a theoretical point of view, the relation between OL and OP is neither obvious nor clear, but the analysis of the empirical studies allows one to assume that OL has an essential impact on OP. However, differences in the strength of the relation were shown and some contradictions related to the presence of the relation between OL and selected (mostly financial performance aspects identified. Furthermore, the article discusses the significant differences and inconsistencies in the methods of measuring OL, measuring OP, selecting contextual factors and adopted methods of data analysis. Implications: Inconsistencies and gaps found in the studies of the relationship between OL and OP made it possible to designate the direction for promising further research. Value: The article presents valuable insight through its in-depth, critical analysis of the organisational learning and organisational outcomes. First and foremost, this indicates that the formula of the previous empirical studies does not allow for the development of precise solutions pertaining to organisational learning management for the benefit of OP improvement.

  16. Intra-organisational accounting during negotiation processes for inter-organisational control

    DEFF Research Database (Denmark)

    Jakobsen, Morten

    . The study concludes that an important role of management accounting is to reveal the intra-organisational cost consequences of proposals made by suppliers during negotiation processes. Thereby cost information becomes an integrated part of the counter-proposals generated and actively used during......To date the literature on management and management accounting within inter-organisational relationships has mainly focussed on managing the interface between the supplier and the buyer. In contrast to most previous research, this study examines the internal practices of a company engaged in inter......-organisational relationships. It addresses the question of how intra-organisational management accounting practices affect the ability to conduct inter-organisational relationships. A qualitative case study is used to gather information from an electronics company. The company enters its inter-organisational relationships...

  17. 78 FR 4467 - UniStar Nuclear Energy, Combined License Application for Calvert Cliffs Power Plant, Unit 3...

    Science.gov (United States)

    2013-01-22

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 52-016; NRC-2008-0250] UniStar Nuclear Energy, Combined License Application for Calvert Cliffs Power Plant, Unit 3, Exemption 1.0 Background UniStar Nuclear Energy (UNE), on behalf of Calvert Cliffs Nuclear Project, LLC and UniStar Nuclear Operating Services...

  18. 76 FR 81994 - UniStar Nuclear Energy; Combined License Application for Calvert Cliffs Nuclear Power Plant, Unit...

    Science.gov (United States)

    2011-12-29

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 52-016; NRC-2008-0250] UniStar Nuclear Energy; Combined License Application for Calvert Cliffs Nuclear Power Plant, Unit 3; Exemption 1.0 Background: UniStar Nuclear Energy (UNE) submitted to the U.S. Nuclear Regulatory Commission (NRC or the Commission ) a...

  19. 76 FR 11522 - In the Matter of Progress Energy Florida, Inc. (Combined License Application, Levy County Nuclear...

    Science.gov (United States)

    2011-03-02

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 52-029-COL, 52-030-COL] In the Matter of Progress Energy Florida, Inc. (Combined License Application, Levy County Nuclear Power Plant, Units 1 and 2... by the Nuclear Regulatory Commission staff in this case. Mr. Dehmel has not previously performed any...

  20. 78 FR 61984 - Copper Valley Electric Association, Inc.; Notice of Application To Amend License and Accepted for...

    Science.gov (United States)

    2013-10-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13124-005] Copper Valley...: Amendment to License. b. Project No: 13124-005. c. Date Filed: September 27, 2013. d. Applicant: Copper..., Copper Valley Electric Association, Inc., P.O. Box 45, Mile 187 Glenn Highway, Glennallen, AK 99588, (907...

  1. The impact of organisational change and fiscal restraint on organisational culture.

    Science.gov (United States)

    Dark, Frances; Whiteford, Harvey; Ashkanasy, Neal M; Harvey, Carol; Harris, Meredith; Crompton, David; Newman, Ellie

    2017-01-01

    Strategies to implement evidence-based practice have highlighted the bidirectional relationship of organisational change on organisational culture. The present study examined changes in perceptions of organisational culture in two community mental health services implementing cognitive therapies into routine psychosis care over 3 years. During the time of the study there were a number of shared planned and unplanned changes that the mental health services had to accommodate. One service, Metro South, had the additional challenge of embarking on a major organisational restructure. A survey of organisational culture was administered to clinical staff of each service at yearly intervals over the 3 years. At baseline assessment there was no significant difference between the two services in organisational culture. At the midpoint assessment, which was conducted at the time the Metro South restructure was operationalized, there were less positive ratings of organisational culture recorded in Metro South compared to the other service. Organisational culture returned to near-baseline levels at endpoint assessment. These findings are consistent with the literature that organisational culture is relatively robust and resilient. It is also consistent with the literature that, at any one time, a service or organisation may have a finite capacity to absorb change. Consequently this limitation needs to be taken into account in the timing and planning of major service reform where possible. The results also extend the literature, insofar as external factors with a high impact on the operation of an organisation may impact upon organisational culture albeit temporarily.

  2. Systems engineering and the licensing of Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Kulesa, T., E-mail: tkulesa@us.ibm.com [IBM, Philidelphia, Pennsylvania (United States); Soderholm, K., E-mail: Kristiina.Soderholm@fortum.com [Fortum Power (Finland); Fechtelkotter, P., E-mail: pfech@us.ibm.com [IBM, Boston, Massacheusets (United States)

    2014-07-01

    Both global warming and the need for dependable sources of energy continue to make nuclear power generation an appealing option. But a history of cost overruns, project delays, and environmental disaster has pushed the industry to innovate and design a more flexible, scalable, and safe source of nuclear energy - the small modular reactor. Innovation in generation technology creates disruption in already complex licensing and regulatory processes. This paper discusses how the application of systems engineering and requirements management can help combat confusion, rework, and efficiency problems across the engineering and compliance life cycle. The paper is based on the PhD Dissertation 'Licensing Model Development for Small Modular Reactors (SMRs) - Focusing on Finnish Regulatory Framework', approved in 2013. The result of the study gives recommendations and tools to develop and optimize the licensing process for SMRs. The most important SMR-specific feature, in terms of licensing, is the modularity of the design. Here the modularity indicates multi-module SMR designs, which creates new challenges in the licensing process. Another feature impacting licensing feasibility is the plan to build many standardized power plants in series and use factory-fabricated modules to optimize the construction costs. SMR licensing challenges are under discussion in many international forums, such as World Nuclear Association Cooperation in Reactor Design Evaluation and Licensing Small Modular Reactor group (WNA CORDEL SMR) group and IAEA INPRO regulators' forum. This paper also presents an application of the new licensing process using Systems Engineering, Requirements Management, and Project Management practices and tools. (author)

  3. Systems engineering and the licensing of Small Modular Reactors

    International Nuclear Information System (INIS)

    Kulesa, T.; Soderholm, K.; Fechtelkotter, P.

    2014-01-01

    Both global warming and the need for dependable sources of energy continue to make nuclear power generation an appealing option. But a history of cost overruns, project delays, and environmental disaster has pushed the industry to innovate and design a more flexible, scalable, and safe source of nuclear energy - the small modular reactor. Innovation in generation technology creates disruption in already complex licensing and regulatory processes. This paper discusses how the application of systems engineering and requirements management can help combat confusion, rework, and efficiency problems across the engineering and compliance life cycle. The paper is based on the PhD Dissertation 'Licensing Model Development for Small Modular Reactors (SMRs) - Focusing on Finnish Regulatory Framework', approved in 2013. The result of the study gives recommendations and tools to develop and optimize the licensing process for SMRs. The most important SMR-specific feature, in terms of licensing, is the modularity of the design. Here the modularity indicates multi-module SMR designs, which creates new challenges in the licensing process. Another feature impacting licensing feasibility is the plan to build many standardized power plants in series and use factory-fabricated modules to optimize the construction costs. SMR licensing challenges are under discussion in many international forums, such as World Nuclear Association Cooperation in Reactor Design Evaluation and Licensing Small Modular Reactor group (WNA CORDEL SMR) group and IAEA INPRO regulators' forum. This paper also presents an application of the new licensing process using Systems Engineering, Requirements Management, and Project Management practices and tools. (author)

  4. Roundtable discussion: Materials management issues supporting licensing renewal

    International Nuclear Information System (INIS)

    1991-01-01

    The purpose of this technical session is to discussion the relationships between nuclear materials management/procurement engineering and plant license renewal. The basis for the discussion is DG-1009 'Standard format and content of technical information for applications to renew nuclear power plant operating licenses', dated 12/90

  5. The Texas concurrent characterization, licensing, and development process

    Energy Technology Data Exchange (ETDEWEB)

    Avant, R.V. Jr. [Texas Low-Level Radioactive Waste Disposal Authority, Austin, TX (United States)

    1993-03-01

    The 72nd Texas Legislature specifically delineated a 400-square-mile area in southeast Hudspeth County where siting activities would be limited. The Authority was given unprecedented powers of property access and eminent domain and expanded budget authority to conduct site selection, characterization, and licensing. In the summer of 1991, the Authority identified five general siting areas in the prescribed region, and in the fall of 1991, the Authority narrowed the siting area to one large ranch composed of about 16,000 acres--called the Faskin Ranch. Site characterization began in 1991 and will be complete by September 1993. In September 1991, Authority staff began preparing the license application and included all available information on the Faskin Ranch. At its February meeting, the Authority`s board directed staff to submit the license application to the Texas Water Commission (the new Texas radiation control agency). The license application was submitted on March 2, 1992, and on April 15, 1992, the Commission determined that the application was sufficiently complete to begin review. Discrete technical packages such as groundwater hydrology, surface water hydrology, design, etc., will be submitted to the agency for review on the completion of each package. A schedule has been developed to allow the regulators the maximum time possible to review critical technical areas while minimizing the total review period.

  6. Dealing with the current permissibility application for constructing a spent fuel DGR in Sweden. SKB's license applications for a spent fuel repository

    International Nuclear Information System (INIS)

    Olsson, Olle

    2014-01-01

    The nuclear power utilities in Sweden were in 1976 obliged to demonstrate a safe method for final disposal of spent fuel in order to start operation of new reactors. This initiated a comprehensive research, development and demonstration programme and the development of the KBS-method for final disposal. A new Nuclear Activities Act in 1984 gave the reactor owners full technical and financial responsibility for the waste. They gave in turn SKB the responsibility for all nuclear waste management. Reprocessing was no longer required and direct disposal of the spent fuel has, since then, been the main alternative. Alternative methods for final disposal have been evaluated and compared to the KBS-3-method but it has remained the preferred alternative. A comprehensive research, development and demonstration programme to strengthen the scientific basis and to refine the KBS-3-method has been operated by SKB since then. The site selection process for the final repository for spent nuclear fuel was initiated in 1992. The work included general siting studies at the national and the municipal level and in 2002, SKB initiated site investigations for siting of a final repository on two sites: the Simpevarp and Laxemar areas and the Forsmark area. At the same time, the work on preparing license applications to construct and operate an encapsulation plant and a final repository for spent fuel was started. In June 2009, SKB announced Forsmark as the selected site for the final repository. This paper reviews the applicable legislation and describes the license application, the licensing review and the preparations for implementation

  7. Advanced CANDU reactor pre-licensing progress

    International Nuclear Information System (INIS)

    Popov, N.K.; West, J.; Snell, V.G.; Ion, R.; Archinoff, G.; Xu, C.

    2005-01-01

    The Advanced CANDU Reactor (ACR) is an evolutionary advancement of the current CANDU 6 reactor, aimed at producing electrical power for a capital cost and at a unit-energy cost significantly less than that of the current reactor designs. The Canadian Nuclear Safety Commission (CNSC) staff are currently reviewing the ACR design to determine whether, in their opinion, there are any fundamental barriers that would prevent the licensing of the design in Canada. This CNSC licensability review will not constitute a licence, but is expected to reduce regulatory risk. The CNSC pre-licensing review started in September 2003, and was focused on identifying topics and issues for ACR-700 that will require a more detailed review. CNSC staff reviewed about 120 reports, and issued to AECL 65 packages of questions and comments. Currently CNSC staff is reviewing AECL responses to all packages of comments. AECL has recently refocused the design efforts to the ACR-1000, which is a larger version of the ACR design. During the remainder of the pre-licensing review, the CNSC review will be focused on the ACR-1000. AECL Technologies Inc. (AECLT), a wholly-owned US subsidiary of AECL, is engaged in a pre-application process for the ACR-700 with the US Nuclear Regulatory Commission (USNRC) to identify and resolve major issues prior to entering a formal process to obtain standard design certification. To date, the USNRC has produced a Pre-Application Safety Assessment Report (PASAR), which contains their reviews of key focus topics. During the remainder of the pre-application phase, AECLT will address the issues identified in the PASAR. Pursuant to the bilateral agreement between AECL and the Chinese nuclear regulator, the National Nuclear Safety Administration (NNSA) and its Nuclear Safety Center (NSC), NNSA/NSC are reviewing the ACR in seven focus areas. The review started in September 2004, and will take three years. The main objective of the review is to determine how the ACR complies

  8. Organisational characteristics associated with shift work practices and potential opportunities for intervention: findings from a Canadian study.

    Science.gov (United States)

    Hall, Amy L; Smit, Andrea N; Mistlberger, Ralph E; Landry, Glenn J; Koehoorn, Mieke

    2017-01-01

    Shift work is a common working arrangement with wide-ranging implications for worker health. Organisational determinants of shift work practices are not well characterised; such information could be used to guide evidence-based research and best practices to mitigate shift work's negative effects. This exploratory study aimed to describe and assess organisational-level determinants of shift work practices thought to affect health, across a range of industry sectors. Data on organisational characteristics, shift work scheduling, provision of shift work education materials/training to employees and night-time lighting policies in the workplace were collected during phone interviews with organisations across the Canadian province of British Columbia. Relationships between organisational characteristics and shift work practices were assessed using multivariable logistic regression models. The study sample included 88 participating organisations, representing 30 700 shift workers. Long-duration shifts, provision of shift work education materials/training to employees and night-time lighting policies were reported by approximately one-third of participating organisations. Odds of long-duration shifts increased in larger workplaces and by industry. Odds of providing shift work education materials/training increased in larger workplaces, in organisations reporting concern for shift worker health and in organisations without seasonal changes in shift work. Odds of night-time lighting policies in the workplace increased in organisations reporting previous workplace accidents or incidents that occurred during non-daytime hours, site maintenance needs and client service or care needs. This study points to organisational determinants of shift work practices that could be useful for targeting research and workplace interventions. Results should be interpreted as preliminary in an emerging body of literature on shift work and health. Published by the BMJ Publishing Group

  9. SKB's safety case for a final repository license application

    International Nuclear Information System (INIS)

    Hedin, Allan; Andersson, Johan

    2014-01-01

    The safety assessment SR-Site is a main component in SKB's license application, submitted in March 2011, to construct and operate a final repository for spent nuclear fuel at Forsmark in the municipality of Oesthammar, Sweden. Its role in the application is to demonstrate long-term safety for a repository at Forsmark. The assessment relates to the KBS-3 disposal concept in which copper canisters with a cast iron insert containing spent nuclear fuel are surrounded by bentonite clay and deposited at approximately 500 m depth in saturated, granitic rock. The principal regulatory acceptance criterion, issued by the Swedish Radiation Safety Authority (SSM), requires that the annual risk of harmful effects after closure not exceed 10 -6 for a representative individual in the group exposed to the greatest risk. SSM's regulations also imply that the assessment time for a repository of this type is one million years after closure. The licence applied for is one in a stepwise series of permits, each requiring a safety report. The next step concerns a permit to start excavation of the repository and requires a preliminary safety assessment report (PSAR) covering both operational and post-closure safety. Later steps include permission to commence trial operation, to commence regular operation and to close the final repository. (authors)

  10. Nuclear Safety Design Base for License Application

    International Nuclear Information System (INIS)

    R.J. Garrett

    2005-01-01

    The purpose of this report is to identify and document the nuclear safety design requirements that are specific to structures, systems, and components (SSCs) of the repository that are important to safety (ITS) during the preclosure period and to support the preclosure safety analysis and the license application for the high-level radioactive waste (HLW) repository at Yucca Mountain, Nevada. The scope of this report includes the assignment of nuclear safety design requirements to SSCs that are ITS and does not include the assignment of design requirements to SSCs or natural or engineered barriers that are important to waste isolation (ITWI). These requirements are used as input for the design of the SSCs that are ITS such that the preclosure performance objectives of 10 CFR 63.111(b) [DIRS 173273] are met. The natural or engineered barriers that are important to meeting the postclosure performance objectives of 10 CFR 63.113(b) and (c) [DIRS 173273] are identified as ITWI. Although a structure, system, or component (SSC) that is ITS may also be ITWI, this report is only concerned with providing the nuclear safety requirements for SSCs that are ITS to prevent or mitigate event sequences during the repository preclosure period

  11. 78 FR 5196 - Notice of Invitation To Participate; Exploration for Coal in Colorado License Application COC-75642

    Science.gov (United States)

    2013-01-24

    ...] Notice of Invitation To Participate; Exploration for Coal in Colorado License Application COC-75642... Mineral Leasing Act of 1920, as amended by the Federal Coal Leasing Amendments Act of 1976, and to Bureau..., Colorado. DATES: Any party electing to participate in this exploration program must send written notice to...

  12. 75 FR 32983 - Commercial Driver's License (CDL) Standards: Exemption

    Science.gov (United States)

    2010-06-10

    ...-28480] Commercial Driver's License (CDL) Standards: Exemption AGENCY: Federal Motor Carrier Safety... commercial driver's license (CDL) as required by current regulations. FMCSA reviewed NAAA's application for... demonstrate alternatives its members would employ to ensure that their commercial motor vehicle (CMV) drivers...

  13. Revisiting Organisational Learning in Integrated Care.

    Science.gov (United States)

    Nuño-Solinís, Roberto

    2017-08-11

    Progress in health care integration is largely linked to changes in processes and ways of doing. These changes have knowledge management and learning implications. For this reason, the use of the concept of organisational learning is explored in the field of integrated care. There are very limited contributions that have connected the fields of organisational learning and care integration in a systematic way, both at the theoretical and empirical level. For this reason, hybridization of both perspectives still provides opportunities for understanding care integration initiatives from a research perspective as well as potential applications in health care management and planning.

  14. Postulated licensing schedule for an independent spent-fuel-storage installation

    International Nuclear Information System (INIS)

    Ludwick, J.D.

    1982-11-01

    A review of licensing requirements, processes, and anticipated actions for independent spent fuel storage installations (ISFSIs) was conducted in order to develop an estimated schedule and sequence of events for licensing a new ISFSI. This estimate will be useful to potential ISFSI owners in planning for the licensing of their facilities. It is concluded that, although many uncertainties exist with respect to such things as legal appeals, about 29 months are estimated to elapse between license application and license issuance for an ISFSI. This estimate is in reasonable agreement with a previous time estimate for licensing an ISFSI, and, taking into account the special circumstances involved, with the actual licensing schedule for the GE-Morris ISFSI. However, individual portions of the licensing schedule from each case studied sometimes vary significantly

  15. Software licenses: Stay honest!

    CERN Multimedia

    Computer Security Team

    2012-01-01

    Do you recall our article about copyright violation in the last issue of the CERN Bulletin, “Music, videos and the risk for CERN”? Now let’s be more precise. “Violating copyright” not only means the illegal download of music and videos, it also applies to software packages and applications.   Users must respect proprietary rights in compliance with the CERN Computing Rules (OC5). Not having legitimately obtained a program or the required licenses to run that software is not a minor offense. It violates CERN rules and puts the Organization at risk! Vendors deserve credit and compensation. Therefore, make sure that you have the right to use their software. In other words, you have bought the software via legitimate channels and use a valid and honestly obtained license. This also applies to “Shareware” and software under open licenses, which might also come with a cost. Usually, only “Freeware” is complete...

  16. Organisation

    DEFF Research Database (Denmark)

    Sørensen, Henrik B.; Hansen, Kaj; Heide, Asbjørn

    Bogen giver en indføring i de centrale emner indenfor organisation og ledelse. Bogen henvender sig især til akademi- og diplomuddannelserne samt uddannelser til professionsbachelorer, der alle har et anvendelsesorienteret formål. Endvidere henvender bogen sig til uddannelser og kurser, der...... beskæftiger sig med ledelse og organisation på et videregående niveau. Til bogen er der udarbejdet en lang række supplerende materialer til undervisere og studerende i form af opgaver og cases, test med tilhørende svar, vejledninger i opgaveløsning og projektarbejde. dette univers kan findes på bogens...... hjemmeside på www.organisation.academica.dk...

  17. Organisation

    DEFF Research Database (Denmark)

    Lindkvist, Pia

    Du vil som læser få et indblik i, hvordan omgivelsernes ændrede krav til virksomhederne ændrer på organisations- og ledelsesteorien. Baggrunden for ”Organisation – videregående uddannelser” er, at give dig egenskaberne til at analysere og vurdere ledelsesmæssige og organisatoriske problemer...

  18. Patenting of university and non-university public research organisations in Germany: evidence from patent applications for medical research results.

    Directory of Open Access Journals (Sweden)

    Peter Tinnemann

    Full Text Available BACKGROUND: Patents are one of the most important forms of intellectual property. They grant a time-limited exclusivity on the use of an invention allowing the recuperation of research costs. The use of patents is fiercely debated for medical innovation and especially controversial for publicly funded research, where the patent holder is an institution accountable to public interest. Despite this controversy, for the situation in Germany almost no empirical information exists. The purpose of this study is to examine the amount, types and trends of patent applications for health products submitted by German public research organisations. METHODS/PRINCIPAL FINDINGS: We conducted a systematic search for patent documents using the publicly accessible database search interface of the German Patent and Trademark Office. We defined keywords and search criteria and developed search patterns for the database request. We retrieved documents with application date between 1988 and 2006 and processed the collected data stepwise to compile the most relevant documents in patent families for further analysis. We developed a rationale and present individual steps of a systematic method to request and process patent data from a publicly accessible database. We retrieved and processed 10194 patent documents. Out of these, we identified 1772 relevant patent families, applied for by 193 different universities and non-university public research organisations. 827 (47% of these patent families contained granted patents. The number of patent applications submitted by universities and university-affiliated institutions more than tripled since the introduction of legal reforms in 2002, constituting almost half of all patent applications and accounting for most of the post-reform increase. Patenting of most non-university public research organisations remained stable. CONCLUSIONS: We search, process and analyse patent applications from publicly accessible databases

  19. Total System Performance Assessment - License Application Methods and Approach

    Energy Technology Data Exchange (ETDEWEB)

    J. McNeish

    2003-12-08

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issues (KTIs) identified in agreements with the U.S. Nuclear Regulatory Commission, the ''Yucca Mountain Review Plan'' (YMRP), ''Final Report'' (NRC 2003 [163274]), and the NRC final rule 10 CFR Part 63 (NRC 2002 [156605]). This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are used in this document.

  20. 77 FR 39675 - Applications for Licensing as a Non-Leveraged Rural Business Investment Company Under the Rural...

    Science.gov (United States)

    2012-07-05

    ... large 3-ring binder. Label the binders with the RBIC's name. Submit one complete and unbound one-sided hard copy of the MAQ and Exhibits suitable for photocopying (i.e., no hole punches, staples, paper clips, tabs or binders). Applicants must enclose in their submission a nonrefundable licensing fee of...

  1. 76 FR 55701 - Notice of Invitation to Participate; Exploration for Coal in Colorado License Application COC-74895

    Science.gov (United States)

    2011-09-08

    ...] Notice of Invitation to Participate; Exploration for Coal in Colorado License Application COC-74895... Mineral Leasing Act of 1920, as amended by the Federal Coal Leasing Amendments Act of 1976, and to Bureau... coal deposits owned by the United States of America in lands located in Routt County, Colorado. DATES...

  2. SSM's licensing review of a spent nuclear fuel repository in Sweden

    International Nuclear Information System (INIS)

    Dverstorpand, Bjoern; Stroemberg, Bo

    2014-01-01

    On 16 March 2011 the Swedish Nuclear Fuel and Waste Management Co. (SKB) submitted license applications for a general license to construct, possess and operate a KBS-3 type spent nuclear fuel repository at the Forsmark site, in Oesthammar municipality, and an encapsulation plant in Oskarshamn municipality. The KBS-3 method, which has been developed by SKB over a period of more than 30 years, entails disposing of the spent fuel in copper canisters, surrounded by a swelling bentonite clay, at about 500 m depth in crystalline basement rock. SKB's applications are being evaluated in parallel by the Swedish Radiation Safety Authority (SSM) according to the Act on Nuclear Activities and by the Land and Environmental Court according to the Environmental Code. During the review SSM will act as an expert review body to the Land and Environmental Court in the areas of radiation protection, safety and security/non-proliferation. Both SSM and the court will produce a statement with a recommendation regarding a licensing decision and licensing conditions to the government. The government will make the final decision after consulting the municipalities concerned by SKB's facilities (municipal veto applies). The current licensing decision is just one of several licensing decisions that will be required for the repository. However it is arguably the most important one, because it is the last licensing stage with a broad societal involvement including an environmental impact assessment (EIA) process, national consultations and municipal veto for the concerned municipalities. The licensing steps to follow, should SKB be granted a license by the government, only require approval by SSM. These steps include application for start of actual construction work, test operation and routine operation. (authors)

  3. Organising to Enable Innovation

    DEFF Research Database (Denmark)

    Brink, Tove

    2016-01-01

    The purpose of this conceptual paper is to reveal how organising can enable innovation across organisational layers and organisational units. This approach calls for a cross-disciplinary literature review. The aim is to provide an integrated understanding of innovation in an organisational approach....... The findings reveal a continous organising process between individual/ team creativity and organisational structures/control to enable innovation at firm level. Organising provides a dynamic approach and contains the integrated reconstruction of creativity, structures and boundaries for enhanced balance...... of explorative and exploitative learning in uncertain environments. Shedding light on the cross-disciplinary theories to organise innovation provides a contribution at the firm level to enable innovation....

  4. 10 CFR 780.45 - Criteria for decision to issue a license.

    Science.gov (United States)

    2010-01-01

    .... A license shall issue to the applicant to use the invention covered by the patent for the purposes stated in the application upon a final decision that: (a) The invention or discovery covered by the... energy; (b) The licensing of such invention or discovery is of primary importance to the conduct of the...

  5. Researching enterprises between organisation and organising

    DEFF Research Database (Denmark)

    Elkjær, Bente; Brandi, Ulrik

    : State University of New York Press. Orlikowski, W. J. (1996). Improvising organizational transformation over time: A situated change perspective. Information Systems Research, 7(1), 63-92. Park, R. E. (1952). Human Communities: The City and Human Ecology Glencoe, IL: Free Press. Rosenthal, S. (1998......RESEARCHING ENTERPRISES BETWEEN ORGANISATION AND ORGANISING Ulrik Brandi & Bente Elkjaer, Department of Learning, University of Aarhus, Danish School of Education, Tuborgvej 164, 2400 Copenhagen NV, Denmark Short paper submission to the 26th European Group of Organization Studies Colloquium, Waves...... philosophy and pragmatism followed by an elaboration of the transactional relationship between subject and world and the notion of social worlds. The final element in the paper is an empirical illustration - researching organisational learning in the midst of change that illustrates the rhythm...

  6. Guide to request license for industrial X-rays practices

    International Nuclear Information System (INIS)

    2000-05-01

    In this work the instructions it plows described to request license for practices it of industrial x-ray it continued. The instructions but important: they plows license type, purpose of the application, source and equipment, location of local the, program of radiological protection and security

  7. 77 FR 38771 - Prospective Grant of Exclusive Patent License

    Science.gov (United States)

    2012-06-29

    ... Exclusive Patent License AGENCY: National Institute of Standards and Technology, Department of Commerce. ACTION: Notice of prospective grant of exclusive patent license. SUMMARY: This is a notice in accordance... embodied in U.S. Patent Application No. 13/346,999 titled ``Chirped-Pulse Terahertz Spectroscopy for...

  8. ITER licensing

    International Nuclear Information System (INIS)

    Gordon, C.W.

    2005-01-01

    ITER was fortunate to have four countries interested in ITER siting to the point where licensing discussions were initiated. This experience uncovered the challenges of licensing a first of a kind, fusion machine under different licensing regimes and helped prepare the way for the site specific licensing process. These initial steps in licensing ITER have allowed for refining the safety case and provide confidence that the design and safety approach will be licensable. With site-specific licensing underway, the necessary regulatory submissions have been defined and are well on the way to being completed. Of course, there is still work to be done and details to be sorted out. However, the informal international discussions to bring both the proponent and regulatory authority up to a common level of understanding have laid the foundation for a licensing process that should proceed smoothly. This paper provides observations from the perspective of the International Team. (author)

  9. The configural approach to organisational commitment: An application in Ghana

    Directory of Open Access Journals (Sweden)

    Edward O. Akoto

    2014-12-01

    Research purpose: To test the theory on profiles of commitment in an African context (Ghana. Motivation for the study: Although the three-component model of organisational commitment has been extended to several regions of Africa, there is a paucity of research on profiles of commitment on the continent. Research approach, design and method: Cross-sectional data from two studies, with samples of 187 and 218, were analysed using k-means clusters. Multivariate analysis of variance (MANOVA was then used to test the differences amongst profiles in their association with contextual variables, such as pay satisfaction, job security, strike propensity and two demographic factors. Main findings: In the k-means cluster analysis, a six-cluster solution emerged in both studies;the profiles include the highly committed and the uncommitted groups, as well as the profiles based on normative commitment and continuance commitment. Overall, the MANOVA post hoc outcome shows that the highly committed group reports higher mean scores on the positive outcome variables (e.g. job security than the uncommitted group. Conversely, the uncommitted group scored relatively higher on the negative organisational outcome (propensity to strike. Other mean differences were found in the respective studies on pay satisfaction, collectivism and the demographic factors. Practical/managerial implications: Employing the configural approach to the study of commitment in this region should increase our understanding of the patterns of attachment and their influence on behaviour. Different patterns of attachment exist within the organisation that may be beneficial or detrimental to behaviour on the job. It is, therefore, important for managers to identify these patterns and target organisational policy and resources appropriately. Contribution/value-add: This study applies the concept of commitment profiles to an untested region: an African context. It, therefore, adds to the literature on the

  10. Organisational Learning: Conceptual Links to Individual Learning, Learning Organisation and Knowledge Management

    OpenAIRE

    Siu Loon Hoe

    2007-01-01

    Organisational learning has over the years been subject of much study by scholars and managers. In the process, the organisational learning concept has been linked to many other knowledge concepts such as individual learning, learning organisation, and knowledge management. This paper draws from existing literature in organisational behaviour, human resource management, marketing, and information management, to further develop the conceptual links between organisational learning and these kno...

  11. [Planning by service organisation priorities. The process of preparing strategic service-organisation plans].

    Science.gov (United States)

    Sampietro-Colom, Laura; Costa, Dolors; Busqué, Anna; Lacasa, Carme

    2008-12-01

    Strategic planning designs the general setting and the strategic principles of a healthcare system, as well as the general guidelines that govern the development of a health system. Strategic service-organisation plans deal with translating healthcare policies into service policies and respond, principally, to the need for services; these give rise to problems that require a solution. They are developed in line with advances in scientific knowledge, the implementation and current characteristics of the healthcare services and the evolution in the competences of professional teams. There are five stages for their development: identification of health/service requirements; prioritisation of needs in health/services; definition of and agreement on service organisation models (care model and service portfolio); the preparation of and agreement on territorial action plans; introduction and evaluation. A conceptual framework is presented along with practical applications carried out in Catalonia.

  12. Employee-driven innovation in large project organisations

    DEFF Research Database (Denmark)

    Sørensen, Henrik; Wandahl, Søren; Christensen, Randi Muff

    2014-01-01

    (EDI). The case was a group of employees in a large governmental client organisation. The EDI framework was based on a theoretical approach to conduct EDI, derived from a previous literature study. The case study was conducted as an exploratory case study with outset in a gaming approach...... that challenged the participants with discussions on obstacles and solutions for EDI. The game approach was undertaken to facilitate discussions on specific EDI topics carefully selected to stimulate both group and plenum discussions. The themes of the theoretical framework were challenged through...... the participants’ discussions and perceptions of the applicability in the organisation. The findings were discussed in relation to the theoretical approach and findings from a comparable case study. It identified overall methods that had the higher robustness and applicability to incorporate in a practical EDI...

  13. Technology neutral licensing requirements: have we been successful?

    International Nuclear Information System (INIS)

    Jamieson, T.

    2009-01-01

    The Canadian Nuclear Safety Commission (CNSC) is Canada's nuclear regulator. In preparation for the licensing of the next generation of nuclear reactors in Canada, the CNSC has made major changes in its processes and procedures associated with all aspects of the licensing life cycle. These include: development of key regulatory documents outlining the CNSC expectations for the design and siting of new reactors; creation of applicant guidelines for completing licensing applications; creation of a comprehensive set of review guides, specifying how topics in applications are to be reviewed; performing pre-project design reviews for proposed new reactor technologies; and streamlining processes wherever possible, such as performing the environmental assessment and license to prepare site activities in parallel. The predicted workload associated with the nuclear renaissance in Canada is real. The CNSC is currently performing: 4 pre-project design reviews (for AECL's ACR-1000 and EC-6, Areva's EPR and Westinghouse's AP-1000), has received applications for 4 new builds (at Darlington, Bruce, Nanticoke and in Alberta) and is in the midst of performing the combined environmental assessment and license to prepare site phases for these sites. This is in addition to the work associated with: the licensing of new uranium mines; oversight of the existing reactor fleet; refurbishments at Bruce/Gentilly/Point Lepreau; license renewal for the NRU reactor; and oversight of our general client base of over 5000 licensees. In this presentation, experience to date with these new processes and procedures will be discussed, including: status of the current new build projects; anticipated new activities; lessons learned, especially the technology neutral approach; application to our other licensed activities, including non-power reactors; and work underway to further develop CNSC methods. Qualifications Needed to Design, Construct and Manufacture Nuclear Systems and Equipment, C. Voutsinos

  14. 75 FR 69063 - Port Bailey Wild Enterprises, LLC; PB Energy, Inc.; Notice of Application for Transfer of License...

    Science.gov (United States)

    2010-11-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1432-010] Port Bailey Wild... Motions To Intervene November 3, 2010. On October 22, 2010, Port Bailey Wild Enterprises, LLC (transferor) and PB Energy, Inc. (transferee) filed a joint application for transfer of license for the Dry Spruce...

  15. AP1000{sup R} licensing and deployment in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Jordan, R. P.; Russ, P. A.; Filiak, P. P.; Castiglione, L. L. [Westinghouse Electric Company LLC, 1000 Westinghouse Drive, Cranberry Township, PA 16066 (United States)

    2012-07-01

    In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two new nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing

  16. 10 CFR 40.33 - Issuance of a license for a uranium enrichment facility.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Issuance of a license for a uranium enrichment facility... License Applications § 40.33 Issuance of a license for a uranium enrichment facility. (a) The Commission... the licensing of the construction and operation of a uranium enrichment facility. The Commission will...

  17. A BWR licensing experience in the USA

    International Nuclear Information System (INIS)

    Powers, J.; Ogura, C.; Arai, K.; Thomas, S.; Mookhoek, B.

    2015-09-01

    The US-Advanced Boiling Water Reactor (A BWR), certified by the United States Nuclear Regulatory Commission (US NRC), is a third generation, evolutionary boiling water reactor design which is the reference for the South Texas Project Units 3 and 4 (STP3-4) Combined License Application (Cola). Nuclear Innovation North America (Nina) is the License Applicant for this new build project, and Toshiba is the selected primary technology contractor. The STP3-4 project has finished the US NRC technical review of the Cola through the final meeting of the Advisory Committee on Reactor Safeguards (ACRS), and the Final Safety Evaluation Report (FSER) is scheduled to be issued by the US NRC in the middle of 2015. The next steps are to support the Mandatory Hearing process, and voting by the NRC commissioners on the motion to grant the Combined License, which is scheduled beginning of 2016 according to US NRC schedule as of March 30, 2015. This paper summarizes the history and progress of the US-A BWR licensing, including the experiences of the Licensee, Nina, and Toshiba as the Epc team worked through the Code of Federal Regulations Title 10 (10-Cfr) Part 52 process, and provides some perspectives on how the related licensing material would also be of value within a 10-Cfr Part 50, two-step process to minimize schedule and financial risks which could arise from ongoing technical developments and regulatory reviews. (Author)

  18. A BWR licensing experience in the USA

    Energy Technology Data Exchange (ETDEWEB)

    Powers, J.; Ogura, C. [Toshiba America Nuclear Energy, Charlotte, North Carolina (United States); Arai, K. [Toshiba Corporation, Yokohama, Kanagawa (Japan); Thomas, S.; Mookhoek, B., E-mail: jim.powers@toshiba.com [Nuclear Innovation North America, Lake Jackson, Texas (United States)

    2015-09-15

    The US-Advanced Boiling Water Reactor (A BWR), certified by the United States Nuclear Regulatory Commission (US NRC), is a third generation, evolutionary boiling water reactor design which is the reference for the South Texas Project Units 3 and 4 (STP3-4) Combined License Application (Cola). Nuclear Innovation North America (Nina) is the License Applicant for this new build project, and Toshiba is the selected primary technology contractor. The STP3-4 project has finished the US NRC technical review of the Cola through the final meeting of the Advisory Committee on Reactor Safeguards (ACRS), and the Final Safety Evaluation Report (FSER) is scheduled to be issued by the US NRC in the middle of 2015. The next steps are to support the Mandatory Hearing process, and voting by the NRC commissioners on the motion to grant the Combined License, which is scheduled beginning of 2016 according to US NRC schedule as of March 30, 2015. This paper summarizes the history and progress of the US-A BWR licensing, including the experiences of the Licensee, Nina, and Toshiba as the Epc team worked through the Code of Federal Regulations Title 10 (10-Cfr) Part 52 process, and provides some perspectives on how the related licensing material would also be of value within a 10-Cfr Part 50, two-step process to minimize schedule and financial risks which could arise from ongoing technical developments and regulatory reviews. (Author)

  19. License plate recognition (phase B).

    Science.gov (United States)

    2010-06-01

    License Plate Recognition (LPR) technology has been used for off-line automobile enforcement purposes. The technology has seen mixed success with correct reading rate as high as 60 to 80% depending on the specific application and environment. This li...

  20. 47 CFR 74.787 - Digital licensing.

    Science.gov (United States)

    2010-10-01

    ..., AUXILIARY, SPECIAL BROADCAST AND OTHER PROGRAM DISTRIBUTIONAL SERVICES Low Power TV, TV Translator, and TV Booster Stations § 74.787 Digital licensing. (a) Applications for digital low power television and... channels may be filed at any time. Such applications shall be filed on FCC Form 346 and will be treated as...

  1. Licensing schedule for away-from-reactor (AFR) spent fuel storage facilities

    International Nuclear Information System (INIS)

    Gray, P.L.

    1981-08-01

    The Nuclear Regulatory Commission has authority to issue licenses for Away-From-Reactor (AFR) installations for the storage of spent nuclear fuel. This report presents a detailed estimate of the time required to prosecute a licensing action. The projected licensing schedule shows that the elapsed time between filing an application and issuance of a license will be about 32 months, assuming intervention. The legal procedural steps will determine the time schedule and will override considerations of technical complexity. A license could be issued in about 14 months in the absence of intervention

  2. A review of tritium licensing requirements

    International Nuclear Information System (INIS)

    Meikle, A.B.

    1982-12-01

    Present Canadian regulations and anticipated changes to these regulations relevant to the utilization of tritium in fusion facilities and in commercial applications have been reviewed. It is concluded that there are no serious licensing obstacles, but there are a number of requirements which must be met. A license will be required from Atomic Energy Control Board if Ontario Hydro tritium is to be applied by other users. A license is required from the Federal Government to export or import tritium. A licensed container will be required for the storage and shipping of tritium. The containers being designed by AECL and Ontario Hydro and which are currently being tested will adequately store and ship all of the Ontario Hydro tritium but are unnecessarily large for the small quantities required by the commercial tritium users. Also, some users may prefer to receive tritium in gaseous form. An additional, smaller container should be considered. The licensing of overseas fusion facilities for the use of tritium is seen as a major undertaking offering opportunities to Canadian Fusion Fuels Technology Project to undertake health, safety and environmental analysis on behalf of these facilities

  3. Exploring corporate social responsibility and organisational commitment within a retail organisation

    OpenAIRE

    Jerelene Soobramoney; Ophillia Ledimo

    2016-01-01

    Organisations have difficulty retaining employees who have the necessary talent, skills and knowledge to give the company a competitive edge in a global market, thus emphasising the need for organisational commitment. The objective of the study was to explore the relationship between corporate social responsibility and organisational commitment within a South African retail organisation. Corporate social responsibility has a positive influence on consumer behaviour and can contribute to corpo...

  4. Applicability of the Organisational Climate Description Questionnaire - Rutgers Elementary: a South African case study

    Directory of Open Access Journals (Sweden)

    D Vos

    2013-01-01

    Full Text Available The Organisational Climate Description Questionnaire - Rutgers Elementary (OCDQ - RE was used to determine the current organizational climate of primary schools in North-West Province, South Africa. This questionnaire evaluates the actions of principals and educators; the current organizational climate in primary schools can be determined from the results. A quantitative research approach, with 904 teachers from 68 schools, was used to determine the applicability of the measuring instrument. Exploratory and confirmatory factor analyses revealed that certain items measuring directive behaviour in the OCDQ-RE grouped with supportive behaviour of the principal. Hence, in this study, these items were regarded as supportive towards the educators and their work by the respondents. According to Cronbach's alpha coefficient the questionnaire can be regarded as reliable. Recommendations are made to render the questionnaire even more applicable for the South African context.

  5. 77 FR 3273 - Government-Owned Inventions; Availability for Licensing

    Science.gov (United States)

    2012-01-23

    ... Technology: Available for licensing is a novel method using short-term treatment with a glucocorticoid...: Licensing information and copies of the U.S. patent applications listed below may be obtained by writing to... into memory cells and terminally differentiated plasma cells. Moreover, IL-21 has anti-tumor activity...

  6. 77 FR 65673 - Prospective Grant of Exclusive Patent License

    Science.gov (United States)

    2012-10-30

    ... Exclusive Patent License AGENCY: National Institute of Standards and Technology, Commerce. ACTION: Notice of prospective grant of exclusive patent license. SUMMARY: This is a notice in accordance with 35 U.S.C. 209(e.... Patent Application No. 61/625,511 titled ``UV-Assisted Alcohol Sensing with Zinc Oxide Functionalized...

  7. Methodology to identify, review, and evaluate components for license renewal

    International Nuclear Information System (INIS)

    Carlson, D.D.; Gregor, F.E.; Walker, R.S.

    1988-01-01

    A methodology has been developed to systematically identify, review, and evaluate plant equipment for license renewal. The method builds upon the existing licensing basis, operating history, and accepted deterministic and probabilistic techniques. Use of these approaches provides a focus for license renewal upon those safety-significant systems and components that are not routinely replaced, refurbished, or subject to detailed inspection as part of the plant's existing test, maintenance, and surveillance programs. Application of the method identified the PWR and BWR systems that should be subjected to detailed license renewal review. Detailed examination of two example systems demonstrates the approach. The review and evaluation of plant equipment for license renewal differ from the initial licensing of the plant. A substantial operating history has been established, the licensing basis has evolved from the original one, and plant equipment has been subject to periodic maintenance and surveillance throughout its life. In consideration of these differences, a basis for license renewal is needed. License renewal should be based upon continuation of the existing licensing basis and recognition of existing programs and operating history

  8. Organisational commitment and turnover intentions in humanitarian organisations

    NARCIS (Netherlands)

    Wijnmaalen, Julia; Heyse, Liesbet; Voordijk, Johannes T.

    2016-01-01

    Unwanted staff turnover is a prominent HRM problem in humanitarian organisations. In the profit sector, HRM tools such as pay, benefits, socialisation and training have proven to be effective in increasing organisational commitment and decreasing staff turnover. This study explores whether such

  9. Stress and organisational citizenship behaviours in Indian business process outsourcing organisations

    Directory of Open Access Journals (Sweden)

    Ajay K. Jain

    2012-09-01

    Full Text Available This study investigates the direct effect of organisational stress (as measured through ASSET on organisational citizenship behaviours (OCBs. A sample of 402 operators was taken from business process outsourcing (BPO organisations located in northern India. The authors hypothesised that there is a negative relationship between organisational stress and OCBs. Results of multiple regression analysis showed that stress had significant negative impact on OCBs. The implications for managers are discussed.

  10. Effect of psychological capital and resistance to change on organisational citizenship behaviour

    Directory of Open Access Journals (Sweden)

    Loyd Beal III

    2013-09-01

    Research purpose: This study examined the possible role of resistance to change as a moderator of the predictive relationship between PsyCap and organisational citizenship behaviour (OCB, in which OCB served as an index for measuring positive organisational change. Motivation for the study: Little empirical research has investigated the application of positive organisational behaviour to government organisations undergoing organisational change. Organisations can use the study results to increase positive outcomes and reduce resistance in government organisations experiencing a holistic change intervention. Research design, approach and method: The data comprised a cross-sectional survey of 97 employees from a government organisation that provides life-cycle career management support. Employees completed the 24-item psychological capital questionnaire, the 16-item organisational citizenship behaviour scale and the 17-item resistance to change scale. Data analyses used a mixed methods approach to merge quantitative inferential statistics with qualitative thematic analysis. Main findings: The quantitative analysis yielded high levels of resistance to change that moderated the positive effect of PsyCap on organisational citizenship behaviour. The thematic analysis revealed that affective, behavioural and cognitive forms of resistance to change were prevalent. Practical/managerial implications: Organisational leaders should seek to reduce resistance and increase the resources that organisations need to effect positive organisational change. Contribution/value-add: This study adds to the growing body of knowledge about positive organisational behaviour in government organisations.

  11. 77 FR 63343 - Biweekly Notice: Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-10-16

    ... in accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10... for an inoperable diesel generator (DG). A commensurate change is also proposed to extend the maximum... alternating current power source (i.e., a supplemental diesel generator) with the capability to power any E...

  12. 77 FR 73684 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-12-11

    ... in accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10... emergency diesel generator, and the stored lube oil inventory will also continue to require that a 7-day supply be available for each diesel generator. The changes are consistent with NRC-approved Technical...

  13. Organisational LCA

    DEFF Research Database (Denmark)

    Martínez-Blanco, Julia; Finkbeiner, Matthias

    2018-01-01

    environmental performance over time, supporting strategic decisions, and informing corporate sustainability reporting. Several initiatives are on the way for the LCA of organisations: the UNEP/SETAC Life Cycle Initiative published the ‘Guidance on organizational LCA’, using ISO/TS 14072 as a backbone; moreover......, when the unit of analysis and the system boundaries are defined. Also, the approach for data collection needs to be fixed. Organisational LCA is a compilation and evaluation of the inputs, outputs and potential environmental impacts of the activities associated with the organisation adopting a life...... cycle perspective. It includes not only the facilities of the organisation itself, but also the activities upstream and downstream the value chain. This methodology is capable of serving multiple goals at the same time, like identifying environmental hotspots throughout the value chain, tracking...

  14. Licensing and Environmental Issues of Wave Energy Projects

    DEFF Research Database (Denmark)

    Neumann, Frank; Tedd, James; Prado, Miguel

    2006-01-01

    a special standing or facilitated access to operating licenses due to their experimental character, the move of wave energy projects towards commercial applications implies complex procedures for obtaining licenses both with respect to the construction and deployment and operation phases, as well......The major non-technical barrier for large-scale wave energy implementation is the wide range of licensing issues and potential environmental concerns, in addition to significant National/regional differences in licensing procedures and permit requirements. Whereas some pilot plants have had...... as concerning ocean space use and environmental concerns. Despite recent efforts to streamline European EIA (Environmental Impact Assessment) in general, potential project developers are far from having a clear view of present and future requirements concerning these barriers on a trans-national level...

  15. Introduction to Technology Export License of Nuclear Facility

    Energy Technology Data Exchange (ETDEWEB)

    Seo, Hana; Lee, Chansuh; Shin, Donghoon [Korea Institute of Nuclear Nonproliferation and Control, Daejeon (Korea, Republic of)

    2014-05-15

    In this regime, the Nuclear Safety and Security Commission (NSSC) has authority on final decision making. And the Korea Institute of Nuclear nonproliferation and Control (KINAC) has missions to review the classification and export licensing technically. In principle, classification and export licensing are applied and reviewed individually. However, the number of application for classification and licensing has increased geometrically in the last three years. This is largely a due to the contract that the Republic of Korea (ROK) has finalized to build the UAE Barakah Nuclear Power Plant (BNPP) and Jordan Research and Training Reactor (JRTR). This circumstance brought an administrative burden for the government and related institutes as well as stakeholders. This article introduces the law related to the 'Technology Export License of Nuclear Facility' which was developed and legislated to improve the efficiency and effectiveness of commodities classification and export licensing. This system could significantly reduce the licensing burden for transferring the technologies. However, the classification and license on this system are still requested when transferring the goods. Therefore, KINAC will continue to figure out the needs for the stakeholders and keep searching for solutions to problems inherent in the industry.

  16. Introduction to Technology Export License of Nuclear Facility

    International Nuclear Information System (INIS)

    Seo, Hana; Lee, Chansuh; Shin, Donghoon

    2014-01-01

    In this regime, the Nuclear Safety and Security Commission (NSSC) has authority on final decision making. And the Korea Institute of Nuclear nonproliferation and Control (KINAC) has missions to review the classification and export licensing technically. In principle, classification and export licensing are applied and reviewed individually. However, the number of application for classification and licensing has increased geometrically in the last three years. This is largely a due to the contract that the Republic of Korea (ROK) has finalized to build the UAE Barakah Nuclear Power Plant (BNPP) and Jordan Research and Training Reactor (JRTR). This circumstance brought an administrative burden for the government and related institutes as well as stakeholders. This article introduces the law related to the 'Technology Export License of Nuclear Facility' which was developed and legislated to improve the efficiency and effectiveness of commodities classification and export licensing. This system could significantly reduce the licensing burden for transferring the technologies. However, the classification and license on this system are still requested when transferring the goods. Therefore, KINAC will continue to figure out the needs for the stakeholders and keep searching for solutions to problems inherent in the industry

  17. Management and organisational factors in PSA; Organisations- und Management-Faktoren in der PSA

    Energy Technology Data Exchange (ETDEWEB)

    Balfanz, H.P. [TUEV Nord e.V., Hamburg (Germany)

    1999-04-01

    The constraints of PSA are increasingly considered with increasing application of PSA for the safety management of nuclear power plants (see US-NRC, 'Risk Informed Regulation', NRC-1). There is a vivid international discourse about the applicability of the variables of plant management and organisation in PSAs, which has lead to a great variety of research activities into this matter (see PSAM 4). This paper here summarizes the current state of progress of research work and discusses the applicability of results. The studies for comparative assessment of methodology and results were performed by the TUeV Nord under the roof of the BMU/BfS-sponsored project SR 2260, ''Further development of probabilistic methods for nuclear power plant safety assessment. (orig./CB) [German] Mit zunehmender Anwendung der PSA (Probabilistische Sicherheitsanalyse) im Sicherheitsmanagement von KKW (vergl. US-NRC, Einfuehrung des Konzepts 'Risk Informed Regulation' NRC-1) gewinnt die Beachtung der Grenzen der PSA zusaetzliche Bedeutung. International ist eine intensive Diskussion ueber die Moeglichkeiten einer Einbindung der Einflussgroesse von Organisation und Management in der PSA zu verzeichnen und wird belegt durch vielfaeltige Forschungs- und Entwicklungsarbeiten (vergl. PSAM 4). Dieser Beitrag setzt sich in erster Linie mit diesem Entwicklungsstand auseinander und diskutiert seinen Anwendungsstand fuer die PSA. Die hierzu vom TUeV Nord durchgefuehrten Arbeiten basieren auf dem BMU/BfS-Vorhaben SR 2260, 'Weiterentwicklung probabilistischer Methoden zur Sicherheitsbeurteilung von KKW'. (orig.)

  18. Why trash don't pass? pharmaceutical licensing and safety performance of drugs.

    Science.gov (United States)

    Banerjee, Tannista; Nayak, Arnab

    2017-01-01

    This paper examines how asymmetric information in pharmaceutical licensing affects the safety standards of licensed drugs. Pharmaceutical companies often license potential drug molecules at different stages of drug development from other pharmaceutical or biotechnology companies and complete the remaining of research stages before submitting the new drug application(NDA) to the food and drug administration. The asymmetric information associated with the quality of licensed molecules might result in the molecules which are less likely to succeed to be licensed out, while those with greater potential of success being held internally for development. We identify the NDAs submitted between 1993 and 2004 where new molecular entities were acquired through licensing. Controlling for other drug area specific and applicant firm specific factors, we investigate whether drugs developed with licensed molecules face higher probability of safety based recall and ultimate withdrawal from the market than drugs developed internally. Results suggest the opposite of Akerlof's (Q J Econ 84:488-500, 1970) lemons problem. Licensed molecules rather have less probability of facing safety based recalls and ultimate withdrawal from the market comparing to internally developed drug molecules. This suggests that biotechnology and small pharmaceutical firms specializing in pharmaceutical research are more efficient in developing good potential molecules because of their concentrated research. Biotechnology firms license out good potential molecules because it increases their market value and reputation. In addition, results suggest that both the number of previous approved drugs in the disease area, and also the applicant firms' total number of previous approvals in all disease areas reduce the probability that an additional approved drug in the same drug area will potentially be harmful.

  19. The effect of organisational context on organisational development (OD) interventions

    OpenAIRE

    Sanjana Brijball Parumasur

    2012-01-01

    Orientation: Systematic and congruent organisational structures, systems, strategies and designs are necessary for the successful implementation of organisational development (OD) interventions. Research purpose: This article examines national and international OD practices. It assesses the effect of diverse cultures and cultural values for determining the effectiveness of OD interventions. Motivation for the study: Most organisational change and development programmes fail and only a ...

  20. 77 FR 70837 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-11-27

    ... intervene shall be filed in accordance with the Commission's ``Rules of Practice for Domestic Licensing... request: The proposed change will delete Function 14, SG [Steam Generator] Water Level--Low, Coincident... capability to shut down the reactor when required on Low--Low Steam Generator water level. The ability to...

  1. 78 FR 16876 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2013-03-19

    ... intervene shall be filed in accordance with the Commission's ``Rules of Practice for Domestic Licensing... proposes to replace the VHS with an onsite diesel generator as the AAC power source providing this... power source (the VHS) with an additional onsite AAC power source (diesel generator). This equipment can...

  2. 77 FR 67679 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-11-13

    ... diesel generator surveillance requirements. Margin of safety is related to the ability of the fission... evaluated; or (3) involve a significant reduction in a margin of safety. The basis for this proposed... accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10 CFR Part 2...

  3. 78 FR 14126 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2013-03-04

    ... in accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10... of the document. The E-Filing system also distributes an email notice that provides access to the... Completion Time has no impact on the consequences of any design basis accident since the consequences of an...

  4. Organisational Pattern Driven Recovery Mechanisms

    Science.gov (United States)

    Giacomo, Valentina Di; Presenza, Domenico; Riccucci, Carlo

    The process of reaction to system failures and security attacks is strongly influenced by its infrastructural, procedural and organisational settings. Analysis of reaction procedures and practices from different domains (Air Traffic Management, Response to Computer Security Incident, Response to emergencies, recovery in Chemical Process Industry) highlight three key requirements for this activity: smooth collaboration and coordination among responders, accurate monitoring and management of resources and ability to adapt pre-established reaction plans to the actual context. The SERENITY Reaction Mechanisms (SRM) is the subsystem of the SERENITY Run-time Framework aimed to provide SERENITY aware AmI settings (i.e. socio-technical systems with highly distributed dynamic services) with functionalities to implement applications specific reaction strategies. The SRM uses SERENITY Organisational S&D Patterns as run-time models to drive these three key functionalities.

  5. Siting Practices and Site Licensing Process for New Reactors in Canada

    International Nuclear Information System (INIS)

    Vos, Marcel de

    2011-01-01

    'Siting' in Canada is composed of Site Evaluation and Site Selection. As outlined in CNSC Regulatory Document RD-346 Site Evaluation for New Nuclear Power Plants (based on IAEA NS-R-3), prior to the triggering of the Environmental Assessment (EA) and licensing processes, the proponent is expected to use a robust process to characterize proposed sites over the full life cycle of the facility, and then develop a fully documented defense of the site selection case. This case forms the backbone for submissions in support of the EA and the application for a License to Prepare Site which will be reviewed by the CNSC and other applicable federal authorities. The Environmental Assessment process and License to Prepare Site in Canada do not require a proponent to select a specific design; however, CNSC does not accept a 'black box' approach to siting. CNSC balances the level of design information required with the extent of safety assurance desired for any designs being contemplated for the proposed site. Nevertheless, the design information submitted must be sufficient to justify the site as suitable for all future licensing stages. The depth of plant design information contributes significantly to the credibility of the applicant's case for both the EA and application for License to Prepare Site. The review process utilizes an assessment plan with defined review stages and timelines. The outcome of these reviews is a series of recommendations to a federal government appointed Joint Review Panel (which also serves as a panel of the 'Commission') which, following public hearings, renders a decision regarding the EA, and subsequently, the application for a License to Prepare Site. (author)

  6. Exploring corporate social responsibility and organisational commitment within a retail organisation

    Directory of Open Access Journals (Sweden)

    Jerelene Soobramoney

    2016-11-01

    Full Text Available Organisations have difficulty retaining employees who have the necessary talent, skills and knowledge to give the company a competitive edge in a global market, thus emphasising the need for organisational commitment. The objective of the study was to explore the relationship between corporate social responsibility and organisational commitment within a South African retail organisation. Corporate social responsibility has a positive influence on consumer behaviour and can contribute to corporate success because CSR activities enhance an organisation’s image. Research has indicated that corporate social responsibility is related to an employee’s commitment. The Corporate Social Responsibility Scale and the Organisational Commitment Scale were administered to a non-probability sample of 171 employees from a population of 268 employees in the human resources department of a retail company. Person’s correlation analysis was used to determine the relationship between corporate social responsibility and organisational commitment. This study provided insight into the corporate social responsibility of the organisation. Managers and practitioners in the human resources may use these findings for the development of corporate social responsibility policies and practices in order to build employee commitment

  7. The Licensing of New Nuclear Power Plants in Europe

    International Nuclear Information System (INIS)

    Raetzke, C.

    2008-01-01

    After an introduction dealing with the nuclear Renaissance in Europe and the specific situation of Germany and of Italy, the article focuses on the question of licensing processes for new reactors. New nuclear power plant projects involve a substantial investment and electric utilities will only take this decision if the licensing and regulatory risk can be adequately managed. Licensing processes should be predictable and efficient in order to give sufficient assurance to applicants. The article discusses best practice in licensing by giving some examples of suitable licensing processes of other countries. It also highlights international initiatives aimed at harmonizing safety requirements for new reactors and a multinational cooperation in reactor design review. These issues should be carefully considered by any country wanting to get new nuclear started. [it

  8. 77 FR 3773 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-01-25

    .... Hartwig Gdynia dba C. Hartwig Transport (NVO), 7, Derdowskiego Street, 81-369 Gdynia, Poland. Officers...: New OFF License. Cheryl G. Wilson dba JC Logistics (NVO & OFF), 28612 Redondo Beach Drive South, Des...: Add NVO Service. CR & J Logistics, Inc. dba Brightwater Shipping Services (NVO & OFF), 8401 Lake Worth...

  9. Organisational commitment and turnover intentions: evidence from Nigerian paramilitary organisation

    Directory of Open Access Journals (Sweden)

    Dotun Olaleye Faloye

    2014-09-01

    Full Text Available This study explores the empirical link between different dimensions of organizational commitment and turnover intentions on Nigeria paramilitary organisation. A literature review of organizational commitment and employee turnover provides the basis for the research hypotheses. Four research hypotheses were formulated and tested at 95% and 99% confidence level. The study adopted a survey research design. A self-administered questionnaire was used, involving 144 respondents from selected paramilitary organisation in Akure, Nigeria to collect data and testing the existing theory. Data collected were analysed using both descriptive and inferential statistical techniques. In contrary to theory, the study revealed a weak positive relationship between organizational commitment dimensions (affective, continuance and normative and turnover intentions. The relationships are statistically significant expect the one between turnover intention and normative commitment which is statistically insignificant. The study concluded that the commitment of an employee to organisational goals, missions, and values is not enough to predict his/her stay in the organisation. There are other variables apart from organisational commitment that are predictor of employees’ intentions to quit. Thus, organisations should look beyond forces in their internal environment, when considering reduction in employee’s turnover intentions and the actual employee’s turnover.

  10. Licensing procedures for Low-Level Waste disposal facilities

    International Nuclear Information System (INIS)

    Roop, R.D.; Van Dyke, J.W.

    1985-09-01

    This report describes the procedures applicable to siting and licensing of disposal facilities for low-level radioactive wastes. Primary emphasis is placed on those procedures which are required by regulations, but to the extent possible, non-mandatory activities which will facilitate siting and licensing are also considered. The report provides an overview of how the procedural and technical requirements for a low-level waste (LLW) disposal facility (as defined by the Nuclear Regulatory Commission's Rules 10 CFR Parts 2, 51, and 61) may be integrated with activities to reduce and resolve conflict generated by the proposed siting of a facility. General procedures are described for site screening and selection, site characterization, site evaluation, and preparation of the license application; specific procedures for several individual states are discussed. The report also examines the steps involved in the formal licensing process, including docketing and initial processing, preparation of an environmental impact statement, technical review, hearings, and decisions. It is concluded that development of effective communication between parties in conflict and the utilization of techniques to manage and resolve conflicts represent perhaps the most significant challenge for the people involved in LLW disposal in the next decade. 18 refs., 6 figs

  11. Total Quality Management in Educational Organisations

    Directory of Open Access Journals (Sweden)

    Edvard Konrad

    2000-12-01

    Full Text Available Movement for Total Quality Management (TQM, which was initially successfully applied in the production of goods, has spread to the service domain including educational organisations. Many of principles and experiences known so far could be creatively transferred to educational situations. Additional research and specific innovations are necessary for successful application of existing knowledge. In this paper we discuss certain topics from the specific nature of the quality of education: the definition of the concept of a consumer, motivation of participants in educational processes, improvement of educational processes, quality of learning and leadership in educational organisations.

  12. Organisational Structure & Change

    Science.gov (United States)

    National Centre for Vocational Education Research (NCVER), 2006

    2006-01-01

    Structural change is seen as a way to meet the challenges of the future that face many organisations. While some writers agree that broad-ranging structural change may not always transform an organisation or enhance its performance, others claim that innovation will be a major source of competitive advantage to organisations, particularly when…

  13. U.S. licensing process and ABWR certification

    International Nuclear Information System (INIS)

    Quirk, J.F.; Williams, W.A.

    1996-01-01

    Part 50 of Title 10 of the Code of Federal Regulation (CFR) establishes a two-step licensing process by which the U.S. Nuclear Regulatory Committee (NRC) authorizes nuclear reactor plant construction through issuance of a construction permit and authorizes operation by issuance of an operating license. At each stage, the NRC Staff conducts technical reviews and there is potential for public hearings. In 1989, the NRC issued a new, simplified licensing process: Part 52. The purpose of the Part 52 licensing process is to provide a regulatory framework that brings about earlier resolution of licensing issues. Because issues are not resolved early in the Part 50 licensing process, approval of an operating license is not assured until after a significant investment has been made in the plant. Part 52 increases the stability and certainty of the licensing process by providing for the early resolution of safety and environmental issues. The Part 52 licensing process features (1) early site permits, (2) design certification, and (3) combined construction permit and operating licenses. As part of the U.S. Advanced Light Water Reactor (ALWR) Program to revitalize the nuclear option through the integration of government/utility/industry efforts, GE undertook the role of applying for certification for its latest product line, the Advanced Boiling Water Reactor (ABWR), under the U.S. ABWR certification program. The ABWR design is an essentially complete plant. Initial application for design certification was in 1987 under Part 50. GE reapplied in late 1991 under the newly promulgated Part 52. Following seven years of intensive interactions with the NRC and ACRS, GE was awarded the first Final Design Approval (FDA) under Part 52. The Commission initiated rulemaking by publishing the proposed ABWR Certification Rule in the Federal Register in early 1995. Certification is anticipated mid-1996. (J.P.N.)

  14. Organisational learning in professional discourses.

    Directory of Open Access Journals (Sweden)

    Martin Sedláček

    2012-06-01

    Full Text Available Authors of the paper discuss the concept of organisational learning. Theyrefer to a wide range of definitions and concepts, point out some differences from related or analogous concepts used, such as knowledge management and learning organisation. They note the discussions that relate to key topics. These discussions concern levels at which organisational learning can take place, the effect on behaviour organisational performance. The following section of this article presents organisational learning as a process and describes the stages of organisational learning. The purpose of the article is to provide an overview of efforts to define organisational learning, including criticism of the results of this effort. The last partis devoted to selected theories and empirical findings on organisational learning atschool. The authors stress the importance of organisational learning for schools asspecific organisations and express request to examine the processes of organisational learning in this context.

  15. 76 FR 72409 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-11-23

    ... NVO Service. Pink City Logistics USA LLC (NVO & OFF), 7 Emily Road, Manalapan, NJ 07726; Officers... at (202) 523-5843 or by email at [email protected] . AE Eagle Logistics Inc. (NVO & OFF), 765 Route 83... License. Daybreak Logistics, Inc. (NVO & OFF), 2804 N. Cannon Blvd., Kannapolis, NC 28083; Officers...

  16. Librarian Certification and Licensing: A Brief Accounting.

    Science.gov (United States)

    Kaatrude, Peter B.

    1992-01-01

    Examines certification and licensing of librarians in the United States and Canada from the perspective of differences between the two concepts and through historical analysis of applications of each. A contextual framework for studying applications of these concepts to other professions is provided. (nine references) (MES)

  17. Status of the Monticello nuclear generating plant lead plant license renewal program

    International Nuclear Information System (INIS)

    Pickens, T.A.

    1992-01-01

    In 1988, the Monticello nuclear generating plant was chosen by the US Department of Energy through Sandia National Laboratories and the Electric Power Research Institute to serve as the lead boiling water reactor in the lead plant license renewal program. The purpose of the lead plant license renewal program is to provide insights during the development of and to demonstrate the license renewal regulatory process with the US Nuclear Regulatory Commission (NRC). The work being performed in three phases: (1) preparation of the technical basis for license renewal; (2) development of the technical basis into a formal license renewal application; and (3) review of the application by the NRC. This paper discusses the systems and structures identified as important to license renewal in accordance with 10CFR54 as well as the plant documents and programs that were used in going through the identification process. The systems and structures important to license renewal will then provide insights into how structures and components were identified that are required to be evaluated for aging, the elements of the aging evaluations, and the effective programs used to manage potentially significant aging

  18. Trust in management, communication and organisational commitment: Factors influencing readiness for change management in organisation

    Science.gov (United States)

    Ahmad, Mohd Hafis; Ismail, Syuhaida; Rani, Wan Nurul Mardiah Wan Mohd; Wahab, Mohammad Hussaini

    2017-10-01

    Organisational change occurs when an organisation makes a transition from its current state to some desired future state in minimising employee resistance and cost to the organisation while simultaneously maximising the effectiveness of the change effort. This paper, aims at appraising the change management of organisation in Malaysia since limited research has been done to examine readiness for change by the employees in the organisation. This paper is materialising its objectives of (1) investigating the current practice of organisation and employees in the organisation towards change management and (2) assessing the factors influencing readiness of organisation and employees in the organisation towards change management. It is found via literature review that change management is a structured approach for ensuring that changes are thoroughly and smoothly implemented to transitioning individuals, teams, and organisations to a desired future state by focusing on the wider impacts of change, particularly on people, where change does not happen in isolation and it impacts the whole organisation. Furthermore, it is found that current practice of organisation and employees in the organisation towards change management involved in three main factors, namely trust in management, communication and organisational commitment; with the factor for trust in management is the positive vision for the future by management team, meanwhile for communication, it is found that there is good communication between supervisors and employees about the organisation's policy toward the changes. The factor found in organisational commitment is employees enjoying discussing about their organisation with outsiders. The findings of this paper provide a positive impact on change management planning, which ultimately help in ensuring more effective change programme implementation in the organisation in Malaysia.

  19. Organisational change: Deliberation and modification

    NARCIS (Netherlands)

    Jonker, C.M.; Schut, M.C.; Treur, J.

    2003-01-01

    For an information-agent-based system to support virtual (Internet-supported) organisations, changes in environmental conditions often demand changes in organisational behaviour, i.e., organisational changes. As organisational behaviour relates to organisational structure, rethinking the structure

  20. Organising integration

    DEFF Research Database (Denmark)

    Axelsson, Runo

    2013-01-01

    Background: In Sweden, as in many other countries, there has been a succession of trends in the organisation of health care and other welfare services. These trends have had different implications for the integration of services in the health and welfare system. Aims: One aim is to discuss...... the implications of different organisational trends for the integration of health and welfare services. Another aim is to introduce a Swedish model of financial coordination as a flexible way to organise integration. Organisational trends: In the 1960’s there was an expansion of health and welfare services leading...... an increasing lack of integration in the health and welfare system. In the 2000’s, there has been a re-centralisation through mergers of hospitals, regions and state agencies. It has become clear, however, that mergers do not promote integration but rather increase the bureaucratisation of the system. Model...

  1. Licensing the California low-level radioactive waste disposal facility

    International Nuclear Information System (INIS)

    Dressen, A.L.; Serie, P.J.; Junkert, R.

    1992-01-01

    California has made significant progress toward the issuance of a license to construct and operate the Southwestern Compact's low-level radioactive waste disposal facility. However, obstacles to completing construction and preparing to receive waste still exist. This paper will describe the technical licensing issues, EIR/S process, political events, and public interactions that have impacted on California regulators' ability to complete the license application review and reach a decision on issuing a license. Issues associated with safely and liability evaluations, finalization of the environmental impact report, and land transfer processes involving multiple state, federal, and local agencies will be identified. Major issues upon which public and political opposition is focusing will also be described. (author)

  2. License renewal

    International Nuclear Information System (INIS)

    Newberry, S.

    1993-01-01

    This article gives an overview of the process of license renewal for nuclear power plants. It explains what is meant by license renewal, the significance of license renewal, and goes over key elements involved in the process of license renewal. Those key elements are NRC requirements embodied in 10 CFR Part 54 (Reactor Safety) and 10 CFR Part 51 (Environmental Issues). In addition Industry Reports must be developed and reviewed. License renewal is essentially the process of applying for a 20 year extension to the original 40 year operating license granted for the plant. This is a very long term process, which involves a lot of preparation, and compliance with regulatory rules and guidelines. In general it is a process which is expected to begin when plants reach an operating lifetime of 20 years. It has provisions for allowing the public to become involved in the review process

  3. 77 FR 68155 - The Armed Forces Radiobiology Research Institute TRIGA Reactor: Facility Operating License No. R-84

    Science.gov (United States)

    2012-11-15

    ... Research Institute TRIGA Reactor: Facility Operating License No. R-84 AGENCY: Nuclear Regulatory Commission... considering an application for the renewal of Facility Operating License No. R-84 (Application), which... the renewal of Facility Operating License No. R-84, which currently authorizes the licensee to operate...

  4. Pesticide use and risk of end-stage renal disease among licensed pesticide applicators in the Agricultural Health Study.

    Science.gov (United States)

    Lebov, Jill F; Engel, Lawrence S; Richardson, David; Hogan, Susan L; Hoppin, Jane A; Sandler, Dale P

    2016-01-01

    Experimental studies suggest a relationship between pesticide exposure and renal impairment, but epidemiological evidence is limited. We evaluated the association between exposure to 39 specific pesticides and end-stage renal disease (ESRD) incidence in the Agricultural Health Study, a prospective cohort study of licensed pesticide applicators in Iowa and North Carolina. Via linkage to the US Renal Data System, we identified 320 ESRD cases diagnosed between enrolment (1993-1997) and December 2011 among 55 580 male licensed pesticide applicators. Participants provided information on use of pesticides via self-administered questionnaires. Lifetime pesticide use was defined as the product of duration and frequency of use and then modified by an intensity factor to account for differences in pesticide application practices. Cox proportional hazards models, adjusted for age and state, were used to estimate associations between ESRD and: (1) ordinal categories of intensity-weighted lifetime use of 39 pesticides, (2) poisoning and high-level pesticide exposures and (3) pesticide exposure resulting in a medical visit or hospitalisation. Positive exposure-response trends were observed for the herbicides alachlor, atrazine, metolachlor, paraquat, and pendimethalin, and the insecticide permethrin. More than one medical visit due to pesticide use (HR=2.13; 95% CI 1.17 to 3.89) and hospitalisation due to pesticide use (HR=3.05; 95% CI 1.67 to 5.58) were significantly associated with ESRD. Our findings support an association between ESRD and chronic exposure to specific pesticides, and suggest pesticide exposures resulting in medical visits may increase the risk of ESRD. Clinicaltrials.gov NCT00352924. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  5. 47 CFR 97.21 - Application for a modified or renewed license grant.

    Science.gov (United States)

    2010-10-01

    ... name, club name, license trustee name or license custodian name in accordance with § 1.913 of this... form to a Club Station Call Sign Administrator who must submit the information thereon to the FCC in an electronic batch file. The Club Station Call Sign Administrator must retain the collected information for at...

  6. Model tracking system for low-level radioactive waste disposal facilities: License application interrogatories and responses

    Energy Technology Data Exchange (ETDEWEB)

    Benbennick, M.E.; Broton, M.S.; Fuoto, J.S.; Novgrod, R.L.

    1994-08-01

    This report describes a model tracking system for a low-level radioactive waste (LLW) disposal facility license application. In particular, the model tracks interrogatories (questions, requests for information, comments) and responses. A set of requirements and desired features for the model tracking system was developed, including required structure and computer screens. Nine tracking systems were then reviewed against the model system requirements and only two were found to meet all requirements. Using Kepner-Tregoe decision analysis, a model tracking system was selected.

  7. Model tracking system for low-level radioactive waste disposal facilities: License application interrogatories and responses

    International Nuclear Information System (INIS)

    Benbennick, M.E.; Broton, M.S.; Fuoto, J.S.; Novgrod, R.L.

    1994-08-01

    This report describes a model tracking system for a low-level radioactive waste (LLW) disposal facility license application. In particular, the model tracks interrogatories (questions, requests for information, comments) and responses. A set of requirements and desired features for the model tracking system was developed, including required structure and computer screens. Nine tracking systems were then reviewed against the model system requirements and only two were found to meet all requirements. Using Kepner-Tregoe decision analysis, a model tracking system was selected

  8. 47 CFR 22.228 - Cellular rural service area licenses subject to competitive bidding.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Cellular rural service area licenses subject to... Procedures § 22.228 Cellular rural service area licenses subject to competitive bidding. Mutually exclusive initial applications for Cellular Rural Service Area licenses are subject to competitive bidding. The...

  9. EVALUATION OF THE PROJECT MANAGEMENT ORGANISATIONAL ABILITY OF PUBLIC ORGANISATIONS

    OpenAIRE

    Florescu Margareta

    2012-01-01

    The quality of the results of a project or a public programme, as well as the quality of project management consist in management process performance.This analysis tool promotes the idea of initiating a new organisational/functional policy – organisational tools regarding project management, a new standard concerning the complexity of the project and the associated risk, as well as a new standard concerning the project management organisational/functional ability. Political decision makers,...

  10. BWR containments license renewal industry report; revision 1. Final report

    International Nuclear Information System (INIS)

    Smith, S.; Gregor, F.

    1994-07-01

    The U.S. nuclear power industry, through coordination by the Nuclear Management and Resources Council (NUMARC), and sponsorship by the U.S. Department of Energy (DOE) and the Electric Power Research Institute (EPRI), has evaluated age-related degradation effects for a number of major plant systems, structures, and components, in the license renewal technical Industry Reports (IR's). License renewal applicants may choose to reference these IR's in support of their plant-specific license renewal applications as an equivalent to the integrated plant assessment provisions of the license renewal rule (IOCFR54). The scope of the IR provides the technical basis for license renewal for U.S. Boiling Water Reactor (BWR) containments. The scope of the report includes containments constructed of reinforced or prestressed concrete with steel liners and freestanding stell containments. Those domestic BWR containments designated as Mark I, Mark II or Mark III are covered, but no containments are addressed before these designs. The report includes those items within the jurisdictional boundaries for metal and concrete containments defined by Section III of the ASME Boiler and Pressure Vessel Code, Division 1, Subsection NE (Class MC) and Division 2 (Class CC) and their supports, but excluding snubbers

  11. 10 CFR 780.34 - Criteria for decision to issue a license.

    Science.gov (United States)

    2010-01-01

    ... license. A license shall issue to the applicant to use the invention covered by the patent declared to be affected with the public interest pursuant to subsection 153b(2) of the Act upon a final decision that: (a...

  12. Regulatory challenges related to the licensing of a new nuclear power plant

    International Nuclear Information System (INIS)

    Maris, M.

    2010-01-01

    Assuring the safety and security of nuclear power plants is recognized world-wide as a challenge for all stakeholders. Particular attention goes to plants planned to be built in countries with not sufficiently developed industrial and regulatory infrastructure and experience. A construction and commissioning project, which is usually an international undertaking, gives opportunities to all national stakeholders to develop further their organisations and competences. In the present paper the duties of a regulatory body are recalled as well as the human resources and competences needed for the licensing of a new nuclear power plant. The regulatory body and its technical safety organization(s) should be strengthened and the international cooperation should contribute to this in a systematic and coordinated way. In particular, the donor country should support the necessary development of the regulatory competences and of an effective safety assessment process supporting the national licensing process. Appropriate support can be provided by the International Atomic Energy Agency (IAEA) and through other bi-lateral or multi-lateral programmes

  13. Economic implications of nuclear plant license renewal in the U.S

    International Nuclear Information System (INIS)

    Smith, L.J.

    2001-01-01

    The NRC and the nuclear industry struggled for many years with the development of a viable license renewal rule. Now that a workable rule appears to have been developed, and the first license renewal applicants have received renewed licenses, the floodgates have opened and a large number of nuclear utilities have announced intentions to seek renewed NRC operating licenses. In this time when profound changes are being experienced in the electric generation markets in the United States, nuclear plant license renewal can have several economic effects that should be considered by utilities prior to the pursuit of an NRC license renewal. This paper examines some of the factors that may be affected by the prospect of an additional 20-year operating life of a nuclear plant. (author)

  14. 78 FR 69852 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-11-21

    .... dba Freight Team dba iGlobal US (NVO & OFF), 15930 Valley Boulevard, City of Industry, CA 91744.... Amexlog Corporation dba Amex Logistics Corp (NVO & OFF), 1970 NW 70th Avenue, Miami, FL 33126. Officers... License. Canfleet Logistics Ltd. (NVO), 1408-700 West Pender Street, Vancouver, B.C. V6C 1G8. Officers...

  15. A new license plate extraction framework based on fast mean shift

    Science.gov (United States)

    Pan, Luning; Li, Shuguang

    2010-08-01

    License plate extraction is considered to be the most crucial step of Automatic license plate recognition (ALPR) system. In this paper, a region-based license plate hybrid detection method is proposed to solve practical problems under complex background in which existing large quantity of disturbing information. In this method, coarse license plate location is carried out firstly to get the head part of a vehicle. Then a new Fast Mean Shift method based on random sampling of Kernel Density Estimate (KDE) is adopted to segment the color vehicle images, in order to get candidate license plate regions. The remarkable speed-up it brings makes Mean Shift segmentation more suitable for this application. Feature extraction and classification is used to accurately separate license plate from other candidate regions. At last, tilted license plate regulation is used for future recognition steps.

  16. Conditions for licensing workers exposed to ionizing radiation

    International Nuclear Information System (INIS)

    2007-01-01

    This entrance speaking on conditions of license workers in the areas of employment ionizing radiation addresses two aspects, the first aspect: industrial applications: speak for the workers in this area by a supervisor to portray industrial and industrial photographer and a supervisor sounding wells and a Nuclear Gauges Supervisor and the previous and subsequent Practices of the law The second aspect: about the medical applications and describes the general conditions of the licenses in this area and those working in this area of professional diagnostic radiology and nuclear medicine technician and technician treatment of radiotherapy and radiation protection officers at large and small institutions

  17. Applicability of IBAMA normative instruction 146-2007 to pipeline environmental licensing

    Energy Technology Data Exchange (ETDEWEB)

    Basbaum, Marcos A.; Fonseca, Renata A.A. [Servicos de Engenharia Emilio Baumgart Ltda. (SEEBLA), Rio de Janeiro, RJ(Brazil)], e-mail: mbasbaum.seebla@petrobras.com.br, e-mail: renataamorim.seebla@petrobras.com.br; Torggler, Bianca F.; Fernandes, Renato; Guimaraes, Ricardo Z.P. [Petroleo do Brasil S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil)], e-mail: torggler@petrobras.com.br, e-mail: renatofer@petrobras.com.br, e-mail: rzaluar@petrobras.com.br

    2009-07-01

    PETROBRAS has been conducting several wildlife programs in response to environmental licensing requirements from IBAMA (Brazilian environmental agency). Since 2007, IBAMA has been requiring the application of the Normative Instruction n. 146 (NI), which establishes criteria for wildlife management in the influence areas of new enterprises. However, experience from PETROBRAS has shown that many of the NI articles are not applicable to pipelines. Thus, a critical analysis of this NI was done based on data from company's wildlife programs. Our analysis indicated that the main NI items that do not apply to pipelines are: 1 - Animal rescue programs in deforested areas and selection of release areas, 2 - More than two fauna monitoring campaigns a year, 3 - Monitoring programs involving all groups of terrestrial vertebrates and also invertebrate classes. The non-applicability of these items is due to: 1 - The majority of pipelines are built in areas without significant native vegetation or with small fragments only, which are usually in secondary stage of ecological succession. Most pipelines scarcely involve removal of primary vegetation, 2 - Pipelines have an influence area restricted to a range of 800 m and the construction directly affects only strips from 20 m to 30 m, 3 - The most relevant impacts associated with pipelines are temporary, and do not persist during their operation. (author)

  18. Celebrity-led development organisations

    DEFF Research Database (Denmark)

    Budabin, Alexandra Cosima; Rasmussen, Louise Mubanda; Richey, Lisa Ann

    2017-01-01

    The past decade has seen a frontier open up in international development engagement with the entrance of new actors such as celebrity-led organisations. We explore how such organisations earn legitimacy with a focus on Madonna’s Raising Malawi and Ben Affleck’s Eastern Congo Initiative. The study...... for funding, endorsements, and expertise. We argue that the ways in which celebrity-led organisations establish themselves as legitimate development actors illustrate broader dynamics of the machinery of development.......The past decade has seen a frontier open up in international development engagement with the entrance of new actors such as celebrity-led organisations. We explore how such organisations earn legitimacy with a focus on Madonna’s Raising Malawi and Ben Affleck’s Eastern Congo Initiative. The study...... draws from organisational materials, interviews, mainstream news coverage, and the texts of the celebrities themselves to investigate the construction of authenticity, credibility, and accountability. We find these organisations earn legitimacy and flourish rapidly amid supportive elite networks...

  19. Organisational Learning and Organisational Memory for SMS and FRMS

    NARCIS (Netherlands)

    Koornneef, F.; Stewart, S.; Akselsson, R.; Ward, M.

    2009-01-01

    Chapter 1: Organisational Learning and Organisational Memory for SMS and FRMS The European Commission HILAS project (Human Integration into theLifecycle of Aviation Systems - a project supported by the European Commission’s 6th Framework between 2005-2009) was focused on using human factors

  20. Licensing systems and inspection of nuclear installations in NEA Member countries. Part 1, Description of licensing systems

    International Nuclear Information System (INIS)

    1977-01-01

    This study provides an assessment of the legislative and regulatory provisions applicable and of the practices followed in the countries concerned and is divided into two separate sections. This document is the first part only. It contains the description of national licensing and inspection systems for nuclear installations in the twenty OECD countries which have specific regulations in this field. Each analysis has been presented following a plan which is as standardised as possible so as to facilitate comparison between the national systems. Part II, which is not included in this document, contains the diagrams illustrating the steps in the licensing procedure and the duties of the bodies involved as well as certain additional documents. It also includes a table showing the sequence of the main steps in the licensing process in the countries covered by this Study

  1. 77 FR 34392 - Government-Owned Inventions; Availability for Licensing

    Science.gov (United States)

    2012-06-11

    ... pneumonia viruses, and other viral infections. Potential Commercial Applications: Prevention and treatment... of federally-funded research and development. Foreign patent applications are filed on selected... INFORMATION: Licensing information and copies of the U.S. patent applications listed below may be obtained by...

  2. Organisation and experience of the regulatory review in the United Kingdom

    International Nuclear Information System (INIS)

    Gausden, R.; Woods, P.B.

    1979-01-01

    Regulatory requirements and stages of the review in the UK are outlined. The organisation, management and working procedures of the Inspectorate are described and the effort and timescale which have been found necessary for a satisfactory safety review is discussed. A number of problem areas in the review situation have been identified from experience and these are discussed and possible solutions proposed. They include the importance of early review of generic aspects of systems which are being considered for licensing, the place of safety principles and of detailed engineering assessment in the review process, the independence of the regulatory group's activities in its study of major technical issues and the use which should be made of outside expertise. (auth.)

  3. Risk Management Standards: Towards a contemporary, organisation-wide management approach

    OpenAIRE

    Koutsoukis, Nikitas-Spiros

    2010-01-01

    Risk management has been progressively evolving into a systemic approach for organisational decision making in today’s dynamic economic environment of the global era. In this context, risk management is reaching beyond its traditional finance and insurance application context and is entering the sphere of generic, organisation-wide management approaches. In support of this argument we consider four generic risk management standards issued at the institutional, national or international level...

  4. Case studies on age-management in organisations: report on organisational case studies

    NARCIS (Netherlands)

    Punte, E.; Conen, W.S.; Schippers, J.; Henkens, C.J.I.M.

    2011-01-01

    The acquisition of case studies was thwarted by the economic crisis and the feeling of being ‘over-researched’ by potential organisations. Although organisations in some sectors (e.g. chemical manufacturing) reported the worst part of the economic crisis was behind, many organisations indicated

  5. Licensing procedures for Low-Level Waste disposal facilities

    Energy Technology Data Exchange (ETDEWEB)

    Roop, R.D.; Van Dyke, J.W.

    1985-09-01

    This report describes the procedures applicable to siting and licensing of disposal facilities for low-level radioactive wastes. Primary emphasis is placed on those procedures which are required by regulations, but to the extent possible, non-mandatory activities which will facilitate siting and licensing are also considered. The report provides an overview of how the procedural and technical requirements for a low-level waste (LLW) disposal facility (as defined by the Nuclear Regulatory Commission's Rules 10 CFR Parts 2, 51, and 61) may be integrated with activities to reduce and resolve conflict generated by the proposed siting of a facility. General procedures are described for site screening and selection, site characterization, site evaluation, and preparation of the license application; specific procedures for several individual states are discussed. The report also examines the steps involved in the formal licensing process, including docketing and initial processing, preparation of an environmental impact statement, technical review, hearings, and decisions. It is concluded that development of effective communication between parties in conflict and the utilization of techniques to manage and resolve conflicts represent perhaps the most significant challenge for the people involved in LLW disposal in the next decade. 18 refs., 6 figs.

  6. The use of U.S. NRC licensing practices for VVERs

    International Nuclear Information System (INIS)

    Popp, D.M.

    2000-01-01

    The licensing process for the upgraded Temelin I and C and Fuel designs were enhanced with the introduction of U.S. Nuclear Regulatory Commission, NRC practices. Specifically, the use of the NRC Regulatory Guide 1.70, 'Standard Format and Content Guide for Safety Analyses Reports' and NRC NUREG 0800, 'Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants', were beneficial in the development and review of Temelin licensing documentation. These standards have been used for the preparation and review of Safety Analysis Reports in the United States and also in a large number of licensing applications around the world. Both Regulatory Guide 1.70 and NUREG 0800 were developed to provide a predictable and structured approach to licensing. This paper discusses this approach and identifies the benefits to designers, writers of licensing documentation and reviewers of licensing documents. (author)

  7. Use of modeling in repository licensing

    International Nuclear Information System (INIS)

    McGarry, J.M. III; Echols, F.S.

    1995-01-01

    A review of the regulatory history of the Nuclear Regulatory Commission (NRC) regulations applicable to the licensing of a geologic repository, as well as a review of NRC administrative (licensing) decisions and federal case law, support the NRC's use of simplified models, in appropriate circumstances, which provide well-documented and reasonably conservative bounding assumptions, together with the use of expert judgement, natural analogues, and other aids to supplement available information, in reaching its reasonable assurance determination whether the public health and safety will be adequately protected if the Yucca Mountain, Nevada site should be licensed for development as a geologic repository. Specific examples are provided to assist the reader to better understand how such qualitative concepts as open-quote reasonable assurance close-quote, open-quote reasonably conservative close-quote, and open-quote adequate close-quote protection are used in an administrative context to resolve technical issues

  8. Organisational skills and tools.

    Science.gov (United States)

    Wicker, Paul

    2009-04-01

    While this article mainly applies to practitioners who have responsibilities for leading teams or supervising practitioners, many of the skills and tools described here may also apply to students or junior practitioners. The purpose of this article is to highlight some of the main points about organisation, some of the organisational skills and tools that are available, and some examples of how these skills and tools can be used to make practitioners more effective at organising their workload. It is important to realise that organising work and doing work are two completely different things and shouldn't be mixed up. For example, it would be very difficult to start organising work in the middle of a busy operating list: the organisation of the work must come before the work starts and therefore preparation is often an important first step in organising work. As such, some of the tools and skills described in this article may need to be used hours or even days prior to the actual work taking place.

  9. Demonstrating safety during license renewal should not be a large task

    International Nuclear Information System (INIS)

    Berto, D.S.

    1993-01-01

    The principal regulatory goal related to nuclear power plant operation is to ensure the health and safety of the public. The principal goal of extended plant operation via the license renewal process is also to ensure the health and safety of the public. The license renewal documentation issued by the Nuclear Regulatory Commission (NRC) provides guidance on what will be acceptable to the NRC in a license renewal application to demonstrate that this goal will be met. Application of this guidance is currently open to wide interpretation, with many of the current approaches proving to be extremely costly, complex, and uncertain of acceptability. This paper evaluates the requirements necessary to ensure the continued health and safety of the public during any license renewal term. This evaluation is based on the stated goals of the License Renewal Rule and on the published bases for the Rule. An approach to License Renewal is recommended that: (1) meets the stated goals of the NRC; (2) is consistent with current regulatory practices; and (3) will continue to ensure the health and safety of the public. This recommended approach is also much less costly than other current approaches, and can be easily agreed to by all participants. This approach will meet regulatory goals, while removing the cost and uncertainty obstacles currently being confronted by utilities. Providing a viable approach to license renewal will allow the renewal process to be pursued by utilities. Without such an approach, safe and reliable nuclear power plants will be permanently shut down at the arbitrary 40 year license limit

  10. Learning organisations

    Directory of Open Access Journals (Sweden)

    Sabina Jelenc Krašovec

    2000-12-01

    Full Text Available A vast array of economical, social, political, cultural and other factors influences the transformed role of learning and education in the society, as well as the functioning of local community and its social and communication patterns. The influences which are manifested as global problems can only be successfully solved on the level of local community. Analogously with the society in general, there is a great need of transforming a local community into a learning, flexible and interconnected environment which takes into account different interests, wishes and needs regarding learning and being active. The fundamental answer to changes is the strategy of lifelong learning and education which requires reorganisation of all walks of life (work, free time, family, mass media, culture, sport, education and transforming of organisations into learning organisations. With learning society based on networks of knowledge individuals are turning into learning individuals, and organisations into learning organisations; people who learn take the responsibility of their progress, learning denotes partnership among learning people, teachers, parents, employers and local community, so that they work together to achieve better results.

  11. Investigating cyberloafing, organisational justice, work engagement and organisational trust of South African retail and manufacturing employees

    Directory of Open Access Journals (Sweden)

    Adele Oosthuizen

    2018-05-01

    Full Text Available Orientation: Understanding cyberloafing, organisational justice, work engagement and organisational trust will lead organisations to develop strategies to counter the consequences of cyberloafing. Research purpose: This research explored the relationships between cyberloafing, organisational justice, work engagement and organisational trust among South African office workers in the retail and manufacturing industry. Motivation for the study: Cyberloafing, a prevalent way for office employees to engage in non-work-related activities during work time, is considered harmful to organisations. Limited research exists about the relationship between cyberloafing and organisational justice, organisational trust and work engagement within South Africa. Research design, approach and method: A quantitative research design was followed. Questionnaires were administered in the South African retail and manufacturing industry; a convenient sample of N = 224 was obtained. Descriptive statistics, Cronbach’s alpha coefficients, structural equation modelling and bootstrapping were used for data analysis. Main findings: Organisational justice was positively related to organisational trust while organisational trust was positively related to work engagement; work engagement related negatively to cyberloafing. Organisational trust mediated the relationship between organisational justice and work engagement while work engagement mediated the relationship between organisational trust and cyberloafing. Practical and managerial implications: Strategies can be developed to enhance and warrant perceptions of organisational justice and fairness that will increase trust levels, leading to higher work engagement and decreased cyberloafing behaviour and resulting in higher productivity. Contribution or value-add: The research revealed that when employees perceive their organisations as being fair, organisational trust will increase, leading to heightened work

  12. Working Place as an Organisational Form of the Process of Labour

    Directory of Open Access Journals (Sweden)

    Amosov Oleg Yu.

    2013-11-01

    Full Text Available In order to achieve efficient functioning of modern production based on application of complex equipment and technology, which is characterised with a big number of internal production links, it is necessary to have an accurate organisation of the working place. The article considers the working place notion not from the position of a portion of space, which is adjusted for performance of production functions by a worker, but as an organisational form of the process of labour, which integrates its following components: organisational, technical, economic, social security of labour and intellectualisation of labour.

  13. The Swedish radiological environmental protection regulations applied in a review of a license application for a geological repository for spent nuclear fuel.

    Science.gov (United States)

    Andersson, Pål; Stark, Karolina; Xu, Shulan; Nordén, Maria; Dverstorp, Björn

    2017-11-01

    For the first time, a system for specific consideration of radiological environmental protection has been applied in a major license application in Sweden. In 2011 the Swedish Nuclear Fuel & Waste Management Co. (SKB) submitted a license application for construction of a geological repository for spent nuclear fuel at the Forsmark site. The license application is supported by a post-closure safety assessment, which in accordance with regulatory requirements includes an assessment of environmental consequences. SKB's environmental risk assessment uses the freely available ERICA Tool. Environmental media activity concentrations needed as input to the tool are calculated by means of complex biosphere modelling based on site-specific information gathered from site investigations, as well as from supporting modelling studies and projections of future biosphere conditions in response to climate change and land rise due to glacial rebound. SKB's application is currently being reviewed by the Swedish Radiation Safety Authority (SSM). In addition to a traditional document review with an aim to determine whether SKB's models are relevant, correctly implemented and adequately parametrized, SSM has performed independent modelling in order to gain confidence in the robustness of SKB's assessment. Thus, SSM has used alternative stylized reference biosphere models to calculate environmental activity concentrations for use in subsequent exposure calculations. Secondly, an alternative dose model (RESRAD-BIOTA) is used to calculate doses to biota that are compared with SKB's calculations with the ERICA tool. SSM's experience from this review is that existing tools for environmental dose assessment are possible to use in order to show compliance with Swedish legislation. However, care is needed when site representative species are assessed with the aim to contrast them to generic reference organism. The alternative modelling of environmental concentrations resulted in much lower

  14. Organisational support, role clarity, job insecurity and organisational commitment of employees in a petrochemical organisation / Rirhandzu Milder Nqubane

    OpenAIRE

    Nqubane, Rirhandzu Milder

    2008-01-01

    Organisations have been under enormous pressure due to the changes that they are constantly faced with. Most organisations have at some stage been involved in restructuring, laying-off of employees, and outsourcing of non-core business activities with the aim of coping with the change process. When organisations go through these changes, they still need to support their employees. They must ensure that the employees' roles are clarified, and that they feel secure in their jobs in order to imp...

  15. 18 CFR 4.106 - Standard terms and conditions of case-specific exemption from licensing.

    Science.gov (United States)

    2010-04-01

    ... LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power... licensing. Any case-specific exemption from licensing granted for a small hydroelectric power project is... falsehoods were made by or on behalf of the applicant. (h) Article 8. Any exempted small hydroelectric power...

  16. Automation of the DoD Export License Application Review Process

    National Research Council Canada - National Science Library

    Young, Shelton

    2002-01-01

    .... The overall audit objective was to determine whether Federal automation programs supporting the export license and review process could be used to establish a common electronic interface creating...

  17. Legal and organisational innovation in the Italian pharmacy system: commercial vs public interest.

    Science.gov (United States)

    Santuari, Alceste

    2017-10-01

    Pharmacy services are undoubtedly an important part of primary care. Pharmacists are entrepreneurs and simultaneously they are entrusted with a public mission in the health care sector. Pharmacies then reflect a contrast between a commercial/economic objective and public interest, which is to be identified with citizens' universal right to health care services. This is the reason why in Italy, as in many other EU countries, pharmacies supply their services according to a prior authorisation granted by public authorities. In common with many EU countries, this authorisation is secured according to a demographic criterion. It is only by means of these licensed pharmacies that citizens can buy drugs under medical prescription. Accordingly, the health system is to be driven by public interest, which has yet to prove how competing interests may be regulated in serving health needs. In the light of EU law, the article advocates for an innovative legal and organisational tool whereby to organise the Italian pharmacy system in order to combine economic consideration and public benefit.

  18. Current regulatory and licensing status for byproduct sources, facilities and applications

    International Nuclear Information System (INIS)

    Tingey, G.L.; Jensen, G.A.; Hazelton, R.F.

    1985-02-01

    Public use of nuclear byproducts, especially radioactive isotopes, will require approval by various regulatory agencies. Use of cesium-137 as an irradiation source for sterilizing medical products will require US Nuclear Regulatory Commission (NRC) approval. Two applications have been filed with NRC, and approval is expected soon. Widespread use of irradiation for food products depends on a favorable ruling by the Food and Drug Administration (FDA). A ruling is pending that would permit irradiation of fruits and vegetables up to 100 krad. NRC also controls the use of isotopes in remote power generators, but little regulatory action has been required in recent years. Recent development of radioluminescent (RL) lighting for runway lights has led to interest by commercial manufacturers. At the present time, a license has been issued to at least one manufacturer for sale of tritium-powered runway lights. 28 refs., 1 fig

  19. The end game must end before license renewal begins

    International Nuclear Information System (INIS)

    Allen, S.R.; Edwards, D.W.

    1995-01-01

    The quest for a process and strategy to achieve license renewal was begun in the mid-1980s with the view that renewal was an imperative. A major portion of the nation's future electric supply seemed to be at stake. For plants who were becoming noncompetitive because of annual capital recovery, license renewal also appeared as the means of survival. These two perceptions led to a third: License renewal should be sought immediately upon completion of the first 20 yr of operation. Although the basic engineering premise of license renewal remains sound, the perceptions regarding timing of an application may be incorrect. This paper suggests that a gauntlet of uncertainty exists for all plants. Further, it is most severe between the 20th and 30th years of operation. Thus, the competitive viability of the plant must be sustained for most of the initial term before license renewal can become a serious option

  20. NRC licensing of uranium enrichment plants

    International Nuclear Information System (INIS)

    Moran, B.W.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) is preparing a rule making that establishes the licensing requirements for low-enriched uranium enrichment plants. Although implementation of this rule making is timed to correspond with receipt of a license application for the Louisiana Energy Services centrifuge enrichment plant, the rule making is applicable to all uranium enrichment technologies. If ownership of the US gaseous diffusion plants and/or atomic vapor laser isotope separation is transferred to a private or government corporation, these plants also would be licensable under the new rule making. The Safeguards Studies Department was tasked by the NRC to provide technical assistance in support of the rule making and guidance preparation process. The initial and primary effort of this task involved the characterization of the potential safeguards concerns associated with a commercial enrichment plant, and the licensing issues associated with these concerns. The primary safeguards considerations were identified as detection of the loss of special nuclear material, detection of unauthorized production of material of low strategic significance, and detection of production of uranium enriched to >10% 235 U. The primary safeguards concerns identified were (1) large absolute limit of error associated with the material balance closing, (2) the inability to shutdown some technologies to perform a cleanout inventory of the process system, and (3) the flexibility of some technologies to produce higher enrichments. Unauthorized production scenarios were identified for some technologies that could prevent conventional material control and accounting programs from detecting the production and removal of 5 kg 235 U as highly enriched uranium. Safeguards techniques were identified to mitigate these concerns

  1. The Atomic Energy Control Board requirements for the radioisotope licensing of a radiopharmaceutical facility

    International Nuclear Information System (INIS)

    Kennedy, P.

    1980-01-01

    Items that must be addressed by an applicant for a radioisotope license in Canada are described. Site, design and operating conditions, safety assessment, organization, emergency procedures and operating policies and procedures must be described to the Atomic Energy Control Board (AECB), in support of any license application. All information submitted in support of the application is subject to AECB's policy on public access to that information. (OT)

  2. The pre-licensing of a multi-purpose hybrid research reactor for high-tech applications 'MYRRHA'

    International Nuclear Information System (INIS)

    Hakimi, N.; Dams, C.; Wertelaers, A.; Nys, V.; Schrauben, M.; Dresselaers, R.

    2013-01-01

    The Belgian Nuclear Research Centre in Mol has been working for several years on the design of a multi-purpose flexible irradiation facility in order to replace the ageing BR2, a multipurpose materials testing reactor (MTR), in operation since 1962. MYRRHA, a flexible fast spectrum research reactor is conceived as an accelerator driven system (ADS), able to operate in sub-critical and critical modes. It contains a proton accelerator of 600 MeV, a spallation target and a multiplying medium with MOX fuel, cooled by liquid lead-bismuth (Pb-Bi). Since February 2011, the Belgian Nuclear Research Centre has engaged in a 'pre-licensing' process with the regulatory authority for an estimated period up to mid 2014. The paper presents on the one hand the objectives of the pre-licensing phase as well as its implementation process and on the other hand, 2 implementing instruments which have been developed by the regulatory authority providing guidance to the designer of MYRRHA in order to meet the pre-licensing phase objectives. The first instrument is a strategic note for the design and operation of MYRRHA where as the second instrument is a guidance document for the format and content of a design options and provisions file (DOPF). Both instruments have been developed taking into account that MYRRHA is an irradiation facility using a Generation IV nuclear power system's type technology (liquid metal cooled fast neutron reactor). The strategic note overview aims to cover the safety approach as well as the security requirements and safeguards obligation applicable to MYRRHA. In particular, in the strategic note, a specific attention has been paid in order to ensure that a safety, security and safeguards integrated approach will drive the development of the MYRRHA design. The safety approach focuses on the safety goals and the minimum safety objectives set by the regulatory authority for this innovative design. The DOPF overview presents its objectives and structure resuming

  3. Three domains of project organising

    OpenAIRE

    Winch, Graham M.

    2014-01-01

    It has become axiomatic in research on project organising that projects are temporary organisations. Yet there are a number of challenges to this axiom: research on matrix organisation, the embeddedness of projects in project ecologies, and projectification all emphasise the relationship of the project to permanent organisations. Similarly, research on project-based firms and owner organisations which are relatively permanent challenges this axiom. This paper develops a conceptual framework w...

  4. Safety and licensing analyses for the Fort St. Vrain HTGR

    International Nuclear Information System (INIS)

    Ball, S.J.; Conklin, J.C.; Harrington, R.M.; Cleveland, J.C.; Clapp, N.E. Jr.

    1982-01-01

    The Oak Ridge National Laboratory (ORNL) safety analysis program for the HTGR includes development and verification of system response simulation codes, and applications of these codes to specific Fort St. Vrain reactor licensing problems. Licensing studies addressed the oscillation problems and the concerns about large thermal stresses in the core support blocks during a postulated accident

  5. The role the safety analysis report and other documents in the licensing procedure in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Albrecht, E.; Ballhaus, S.

    1975-01-01

    Legal requirements for the licensing procedure, requirements for and preparation of licensing documents, authorities and experts participating in the licensing procedure, course of the atomic licensing procedure e.g. application for construction and operation, public hearing, site and concept license, partial licenses. (HP) [de

  6. Licensing authority's control of radiation sources and nuclear materials in Brazil

    International Nuclear Information System (INIS)

    Binns, D.A.C.

    2002-01-01

    Full text: The Brazilian Nuclear Energy Commission is the national licensing authority and among its responsibilities is the control of nuclear materials and radiation sources. This control is carried out in three different ways: 1) Control of the import and export of nuclear materials and radiation sources. To be able to import or export any nuclear material or radiation source, the user has to have an explicit permission of the licensing authority. This is controlled by electronic means in which the user has to fill a special form found on the licensing authority's home page, where he has to fill in his name, license number, license number of his radiation protection officer and data of the material to be imported or exported. These data are checked with a data base that contains all the information of the licensed users and qualified personnel before authorization is emitted. The airport authorities have already installed x-ray machines to check all baggages entering or leaving the country. 2) Transport and transfer permit for radiation sources. In order to transport and/or transfer radiations sources and nuclear materials within the country, the user(s) have to submit an application to the licensing authority. The user(s) fill out an application form where he fills in his company's name, licensing I.D., radiation protection officer's name and I.D and identification of the sources involved. These information are checked with the licensing operations data before the operations is permitted. 3) Inspections and radiation monitoring systems. Routine and regulatory inspections are continuously carried out where the user's radiation sources and nuclear materials inventory are checked. Also the physical security and protection of these materials are verified. The installation of monitoring systems is an item that is being discussed with the airport authorities so as to increase the possibilities of detecting any illegal transport of these materials. (author)

  7. Innovation and organisational performance: A critical review of the instruments used to measure organisational performance

    Directory of Open Access Journals (Sweden)

    Tebogo Sethibe

    2016-10-01

    Full Text Available Background: Innovation is recognised as one of the most important determinant of organisational performance. Yet, the results of studies that investigate the relationship between innovation and organisational performance are inconclusive. The inconsistency has been attributed to a number of factors, which include, among others, the measures used to evaluate organisational performance. Aim: This study was set out to identify, categorise and critically analyse the instruments used to assess organisational performance when investigating the relationship between innovation and organisational performance. Setting: The study focuses on all scientific publications reporting on organisational performance, inclusive of both financial and non-financial indicators of performance, and are not limited to any specific country or industry. Methods: The systematic literature review methodology was used to identify studies which investigated the relationship between innovation and organisational performance. Once identified, articles were analysed on the way organisational performance was measured. Classification was done with reference to financial and non-financial indicators, accounting and market-based, as well as objective and subjective measures. Results: The findings show that profitability, sales growth and return on assets (ROA are the most preferred accounting-based financial measures of organisation performance. In addition, Tobin’s Q was found to be the most favoured market-based financial measure of organisational performance. The study further reveals that market share, customer satisfaction and productivity are the most popular non-financial-based measures of organisational performance. Conclusion: The use of measures of organisational performance is often left to the discussion of the researcher, which is not implicitly wrong, but does little to contribute to the body of knowledge on this important topic. Researchers are firstly urged to

  8. 47 CFR 25.148 - Licensing provisions for the Direct Broadcast Satellite Service.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Licensing provisions for the Direct Broadcast Satellite Service. 25.148 Section 25.148 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25.148...

  9. Fibrosing organising pneumonia.

    Science.gov (United States)

    Beardsley, Brooke; Rassl, Doris

    2013-10-01

    Organising pneumonia (otherwise referred to as bronchiolitis obliterans organising pneumonia) is characterised histologically by plugs of granulation tissue, which are present predominantly within small airways, alveolar ducts and peri-bronchiolar alveoli. This pattern is not specific for any disorder or cause, but is one type of inflammatory response to pulmonary injury, which may be seen in a wide variety of clinical conditions. Typically, organising pneumonia responds very well to corticosteroid treatment; however, a small percentage of patients appear to develop progressive fibrosis.

  10. The Compassionate Organisation

    DEFF Research Database (Denmark)

    Jørgensen, Poul Erik Flyvholm; Isaksson, Maria

    2015-01-01

    – The research shows that the public sector sticks to its guns in maintaining a web-transmitted values discourse which forefronts goodwill towards its clients. It also shows that the public and private sectors take different approaches to goodwill. Originality/value – Strategists and communication specialists......Structured Abstract: Purpose – This paper tests whether organisations in the public domain have embraced a corporate type of discourse, mirroring the private sector’s preferred orientation towards expertise, or whether they maintain their traditional discourse of goodwill towards the publics...... a detailed analysis of organisational value statements posted on the websites of public and private organisations. The research considers the value priorities of fifty organisations in the UK and Scandinavia in order to gauge the extent of convergence between the two sectors’ preferred discourses. Findings...

  11. Conceptual Design of On-line Based Licensing Review and Assesment System of Nuclear Installations and Nuclear Materials ('PRIBEN')

    International Nuclear Information System (INIS)

    Melani, Ai; Chang, Soon Heung

    2008-01-01

    At the present Indonesia has no nuclear power plant in operation yet, although it is expected that the first nuclear power plant will be operated and commercially available in around the year of 2016 to 2017 in Muria Peninsula. There are only three research reactors, one nuclear fuel fabrication plant for research reactors, and one experimental fuel fabrication plant for nuclear power, one isotope production facility and some other research facilities. All the facility is under Nuclear Energy Regulatory Agency (BAPETEN) controlling through regulation, licensing and inspection. The organizations operation submits licensing application to BAPETEN before utilizing the facility. According to the regulation before BAPETEN give license they perform review and assessment for the utility application. Based on the review and assessment result, BAPETEN may stipulate, reject, delay or terminate the license. In anticipation of expansion of the nuclear program in Indonesia, BAPETEN should have an integrated and updated system for review and asses the licensing application. For this reason, an expert system for the review and asses the licensing application, so-called PRIBEN (Perizinan Reaktor, Instalasi dan Bahan Nuklir/Licensing of Reactor, Nuclear Installations and Nuclear Materials), is developed which runs on the online-based reality environment

  12. Politicking information technology strategy in organisations: A case study of a selected organisation in South Africa

    Directory of Open Access Journals (Sweden)

    Michael Twum-Darko

    2015-06-01

    Full Text Available The paper discusses the impact of organisational polities on IT strategy formulation and implementation in an organisation. The objective is to determine the extent of organisational polities on strategy implementation in an organisation. The paper considered the interplay between stakeholders in influencing IT strategy formulation and implementation in an organisation as a socially constructed phenomenon. Thus, the phenomenon can be interpreted and understood by using social theories such Structuration Theory. Hence the paper adopted ANT as a lens through which to understand and interpret the sociotechnical processes associated with IT strategy formulation and implementation in an organisation. Through IT strategy, many organisations attempt to set out key directions and objectives for the use and management of information, communication and technologies. A shared view among these organisations is that IT strategy allows all parts of the organisation to gain a shared understanding of priorities, goals and objectives for both current and future states as defined in the organisational strategy. It is therefore arguable that IT strategy, for the foreseeable future will remain a key aspect of development within organisations. As a result, there has been more focus on how IT strategy is formulated and articulated. What is missing though, is less attention to the implementation of it. Using interpretive research philosophy and employing semi-structured interviews as data collection instrument, this paper attempts to suggest a matrix that will assist organisation to comprehend and deal with organisational politics to reduce its negative impact on IT strategy formulation and implementation in an organisation

  13. Cooperative phenomena within organised bi-dimensional structures

    International Nuclear Information System (INIS)

    Armand, Franck

    2001-01-01

    In this report produced for an Accreditation to Supervise Research, the author defines a cooperative phenomenon as a phenomenon occurring each time a cooperation between elementary entities results in a collective property which exceeds the simple addition of disorganised individual properties. He reports works and researches which show that such phenomena can be generated by molecular architectures developed in laboratory, but also requires an appropriate organisation of active elementary entities. This can be obtained by self-organisation in solution. However, many applications assume the use of solid phases, and notably thin layers. In this respect, the Langmuir-Blodgett technique and self-assembly are very interesting techniques to produce mono-molecular thin layers, without however controlling molecule in-plane orientation and organisation. The author propose an overview of his works which aimed at obtaining this control, and reports three examples of cooperative phenomena: the generation of a second harmonic, spin transition with hysteresis, and electron conduction (one-dimensional and bi-dimensional electron transfer). The report also contains articles published in various scientific publications, and contributions to congresses [fr

  14. Organisational readiness: exploring the preconditions for success in organisation-wide patient safety improvement programmes.

    Science.gov (United States)

    Burnett, Susan; Benn, Jonathan; Pinto, Anna; Parand, Anam; Iskander, Sandra; Vincent, Charles

    2010-08-01

    Patient safety has been high on the agenda for more than a decade. Despite many national initiatives aimed at improving patient safety, the challenge remains to find coherent and sustainable organisation-wide safety-improvement programmes. In the UK, the Safer Patients' Initiative (SPI) was established to address this challenge. Important in the success of such an endeavour is understanding 'readiness' at the organisational level, identifying the preconditions for success in this type of programme. This article reports on a case study of the four NHS organisations participating in the first phase of SPI, examining the perceptions of organisational readiness and the relationship of these factors with impact by those actively involved in the initiative. A mixed-methods design was used, involving a survey and semistructured interviews with senior executive leads, the principal SPI programme coordinator and the four operational leads in each of the SPI clinical work areas in all four organisations taking part in the first phase of SPI. This preliminary work would suggest that prior to the start of organisation-wide quality- and safety-improvement programmes, organisations would benefit from an assessment of readiness with time spent in the preparation of the organisational infrastructure, processes and culture. Furthermore, a better understanding of the preconditions that mark an organisation as ready for improvement work would allow policymakers to set realistic expectations about the outcomes of safety campaigns.

  15. 47 CFR 13.17 - Replacement license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Replacement license. 13.17 Section 13.17 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.17 Replacement... request a replacement. The application must be accompanied by the required fee and submitted to the...

  16. Licensing topical report: interpretation of general design criteria for high-temperature gas-cooled reactors

    International Nuclear Information System (INIS)

    Orvis, D.D.; Raabe, P.H.

    1980-01-01

    This Licensing Topical Report presents a set of General Design Criteria (GDC) which is proposed for applicability to licensing of graphite-moderated, high-temperature gas-cooled reactors (HTGRs). Modifications as necessary to reflect HTGR characteristics and design practices have been made to the GDC derived for applicability to light-water-cooled reactors and presented in Appendix A of Part 50, Title 10, Code of Federal Regulations, including the Introduction, Definitions, and Criteria. It is concluded that the proposed set of GDC affords a better basis for design and licensing of HTGRs

  17. Cooperation in reactor design evaluation and licensing

    International Nuclear Information System (INIS)

    Kaufer, B.; Wasylyk, A.

    2014-01-01

    In January 2007 the World Nuclear Association (WNA) established the Cooperation in Reactor Design Evaluation and Licensing (CORDEL) Working Group with the aim of stimulating a dialogue between the nuclear industry (including reactor vendors, operators and utilities) and nuclear regulators (national and international organisations) on the benefits and means of achieving a worldwide convergence of reactor safety standards for reactor designs. From the time of its inception to the present, CORDEL has evolved from a group of experts discussing how to achieve international standardisation in nuclear safety design to an established and recognised working group dedicated to analysing and forging common understandings in key areas as input to major decisions on nuclear energy policy. This paper will review the general directions and activities CORDEL plans to undertake during the next five-year period, including its general strategy, activities, priorities and interactions with its customers in order to meet its objectives. (author)

  18. Cooperation in reactor design evaluation and licensing

    Energy Technology Data Exchange (ETDEWEB)

    Kaufer, B.; Wasylyk, A. [World Nuclear Association, London (United Kingdom)

    2014-07-01

    In January 2007 the World Nuclear Association (WNA) established the Cooperation in Reactor Design Evaluation and Licensing (CORDEL) Working Group with the aim of stimulating a dialogue between the nuclear industry (including reactor vendors, operators and utilities) and nuclear regulators (national and international organisations) on the benefits and means of achieving a worldwide convergence of reactor safety standards for reactor designs. From the time of its inception to the present, CORDEL has evolved from a group of experts discussing how to achieve international standardisation in nuclear safety design to an established and recognised working group dedicated to analysing and forging common understandings in key areas as input to major decisions on nuclear energy policy. This paper will review the general directions and activities CORDEL plans to undertake during the next five-year period, including its general strategy, activities, priorities and interactions with its customers in order to meet its objectives. (author)

  19. How Employees' Perception of Information Technology Application and Their Knowledge Management Capacity Influence Organisational Performance

    Science.gov (United States)

    Kuo, Yen-Ku; Ye, Kung-Don

    2010-01-01

    This study investigates how workers' gender, work experience, designated division, and appointment affect (i) their perception of information technology (IT) within the organisation, (ii) their self-perceived capacity in knowledge management (KM), and (iii) their perception of organisational performance (OP). Furthermore, the study also examines…

  20. To License or Not to License Remanufacturing Business?

    Directory of Open Access Journals (Sweden)

    Zu-Jun Ma

    2018-01-01

    Full Text Available Many original equipment manufacturers (OEMs face the choice of whether to license an independent remanufacturer (IR to remanufacture their used products. In this paper, we develop closed-loop supply chain models with licensed and unlicensed remanufacturing operations to analyze the competition and cooperation between an OEM and an IR. The OEM sells new products and collects used products through trade-ins, while the IR intercepts the OEM’s cores to produce remanufactured products and sell them in the same market. We derive optimal decisions for each of the two types of firms in licensed and unlicensed remanufacturing scenarios and identify conditions under which the OEM and the IR would be most likely to cooperate with each other in implementing remanufacturing. The results show although it is beneficial for an OEM to license an IR to remanufacture its cores, it is not always necessary for an IR to accept OEM’s authorization. Moreover, we contrast the result for licensed remanufacturing scenario in the decentralized system with that in the centrally coordinated system to quantify potential inefficiency resulting from decentralization of decision making.

  1. Factors affecting performance and productivity of nurses: professional attitude, organisational justice, organisational culture and mobbing.

    Science.gov (United States)

    Terzioglu, Fusun; Temel, Safiye; Uslu Sahan, Fatma

    2016-09-01

    To identify relationships among variables affecting nurses' performance and productivity, namely professional attitudes, organisational culture, organisational justice and exposure to mobbing. The determination of the factors affecting performance and productivity is important for providing efficient nursing services. These factors have been investigated in the literature independently, but the relationship among them has not been clearly identified. This cross-sectional questionnaire study included 772 nurses working in a University Hospital accredited by Joint Commission International. The professional attitude score of the nurses was high (4.35 ± 0.63). However, their organisational justice (2.22 ± 1.26) and organisational culture (2.47 ± 0.71) scores were low. Nurses were subjected to mobbing at a high level (0.82 ± 0.78). As the organisational justice increased, the organisational culture increased and the mobbing decreased. As the organisation culture decreased, the mobbing increased. There was a positive correlation between organisation culture and organisational justice of the nurses and a negative correlation with mobbing. The results of the study are essential for improving nurses' performance and productivity. © 2016 John Wiley & Sons Ltd.

  2. Review: Karin Reiber (2005. Organisation im Spiegel der Regula Benedicti [Organisation in Reflection of Regula Benedicti

    Directory of Open Access Journals (Sweden)

    Jürgen Rausch

    2007-01-01

    Full Text Available For 1500 years, the monastic life of the Benedictines has been defined by rules dating from the time of the first foundation of the order, suggesting an organizational structure that has outlasted historical upheavals and changes. Starting from a new understanding of organisational development as organisational learning, Karin REIBER has looked for clues to organisational formation and learning through a hermeneutic textual analysis of the Regula Benedicti of the 6th Century. Within a theoretical framework, REIBER develops three dimensions of organisational formation and three stages of organisational learning. In a historical reconstruction, the author analyses the text of the Regula Benedicti. In a second section, REIBER adapts and interprets the results of the hermeneutic analysis through a double three-stage theoretical model. She works out interesting aspects for organisational learning, which relate individual learning to organisational learning in favour of members of the organisation, for which consideration for individuality forms a part of the leadership concept and as a framework for social relationships, establishing an informal organisational structure beside the formal one. This illuminating work leads to an integrated concept of organisational learning, which extends the notion of tradition as a characteristic feature of an innovative organisation and which, through continuity and topicality, can hence guarantee the continued existence of modern organisations in the future. URN: urn:nbn:de:0114-fqs070174

  3. Technology licensing in China

    DEFF Research Database (Denmark)

    Wang, Yuandi; Li-Ying, Jason; Chen, Jin

    2015-01-01

    We explore the landscape of technology licensing among Chinese entities in the period 2000–12, using a unique database on technological licensing from the State Intellectual Property Office of China. We find that: first, among Chinese licensee organizations, firms have dominated in terms...... of the number of licensed technologies; second, the geographical distribution of licensed technologies among the provinces has gradually reached a new quantitative balance; third, utility models are the most popular technologies to be licensed and the majority of technology licensing in China has been between...... Chinese entities, and most transactions have been local within provinces; and finally, Chinese firms have gradually in-licensed newer and newer technologies, but the technologies in-licensed from foreign sources are by no means state-of-the-art. We make several suggestions for innovation policy...

  4. The influence of personal and organisational factors on entrepreneurship intention: An application in the health care sector.

    Science.gov (United States)

    Marques, Carla S; Valente, Sandra; Lages, Marisa

    2018-03-05

    This study sought to contribute to research on entrepreneurial intention by identifying which constructs of the entrepreneurial profile and internal conditions of health care organisations support entrepreneurship and contribute to the entrepreneurial intention of these organisations' employees. In addition to psychological attributes, cognitive processes, motivations, sociodemographic and professional characteristics, and entrepreneurial skills, the literature indicates that internal conditions of organisations also contribute to explaining entrepreneurial intention. To evaluate this model empirically, the primary data were collected with questionnaires distributed to nurses in two public hospitals-the Trás-os-Montes and Alto Douro Hospital Center and the Local Health Unit of the Northeast. A total of 638 nurses filled out the questionnaire. The data were analysed using inferential and regression analyses. The results suggest that the dimensions related to personal attributes, namely, motivation and entrepreneurial skills, are the constructs that best explain the entrepreneurial intention of these professionals within their organisations. A broad discussion is needed about how to implement internal conditions that promote an intrapreneurial and innovative culture in health care organisations. Health care organisation administrators need to prioritise intrapreneurship while structuring their management strategies, thereby creating favourable internal conditions (e.g., support, autonomy, rewards, time availability and appropriate organisational procedures) that enhance their nurses' entrepreneurial intention. © 2018 John Wiley & Sons Ltd.

  5. Organised Cultural Encounters

    DEFF Research Database (Denmark)

    Christiansen, Lene Bull; Galal, Lise Paulsen; Hvenegård-Lassen, Kirsten

    2017-01-01

    The article introduces the special issue by presenting the concept of organised cultural encounters that are encounters organised to manage and/or transform problems perceived to originate in or include cultural differences. Inspired by Pratt’s conceptualisation of the contact zone, a critical...... perspective on the particular historical and spatial context of any encounter and how this context frames and mediates what takes place during an encounter is applied. While the articles of the issue present different varieties of organised cultural encounters, it is argued that they are not only of the same...

  6. Nebraska withdraws its intent to deny site license

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The state of Nebraska has withdrawn its notice of intent to deny the US Ecology (USE) license application for the proposed low-level radioactive waste disposal site in Boyd County, near Butte, Neb. On October 4, after review of USE's August 27 submittal of a revision to the boundaries of the proposed site, a letter from the state's Department of Health (DOH) and Department of Environmental Quality (DEQ) to John. H. DeOld, the USE project manager for the Central Interstate Compact's proposed LLW site, noted that open-quotes...we are hereby withdrawing the Notice of Intent to Deny License as a moot, and will conduct a substantive review of the reconfigured site for compliance with the applicable regulations.close quotes

  7. Managing crises through organisational development: a conceptual framework.

    Science.gov (United States)

    Lalonde, Carole

    2011-04-01

    This paper presents a synthesis of the guiding principles in crisis management in accordance with the four configurational imperatives (strategy, structure, leadership and environment) defined by Miller (1987) and outlines interventions in organisational development (OD) that may contribute to their achievement. The aim is to build a conceptual framework at the intersection of these two fields that could help to strengthen the resilient capabilities of individuals, organisations and communities to face crises. This incursion into the field of OD--to generate more efficient configurations of practices in crisis management--seems particularly fruitful considering the system-wide application of OD, based on open-systems theory (Burke, 2008). Various interventions proposed by OD in terms of human processes, structural designs and human resource management, as well as strategy, may help leaders, members of organisations and civil society apply effectively, and in a more sustainable way, the crisis management guiding principles defined by researchers. © 2011 The Author(s). Disasters © Overseas Development Institute, 2011.

  8. PWR reactor pressure vessel internals license renewal industry report; revision 1. Final report

    International Nuclear Information System (INIS)

    Schwirian, R.; Robison, G.

    1994-07-01

    The U.S. nuclear power industry, through coordination by the Nuclear Management and Resources Council (NUMARC), and sponsorship by the U.S. Department of Energy (DOE) and the Electric Power Research Institute (EPRI), has evaluated age-related degradation effects for a number of major plant systems, structures and components, in the license renewal technical Industry Reports (IRs). License renewal applicants may choose to reference these IRs in support of their plant-specific license renewal applications, as an equivalent to the integrated plant assessment provisions of the license renewal rule (10 CFR Part 54). Pressurized water reactor (PWR) reactor pressure vessel (RPV) internals designed by all three U.S. PWR nuclear steam supply system vendors have been evaluated relative to the effects of age-related degradation mechanisms; the capability of current design limits; inservice examination, testing, repair, refurbishment, and other programs to manage these effects; and the assurance that these internals can continue to perform their intended safety functions in the license renewal term. This industry report (IR), one of a series of ten, provides a generic technical basis for evaluation of PWR reactor pressure vessel internals for license renewal

  9. ORGANISATIONAL JUSTICE AND AFFECTIVE COMMITMENT: THE MEDIATING ROLE OF PERCEIVED ORGANISATIONAL SUPPORT

    OpenAIRE

    Pooja Purang

    2011-01-01

    Perception of fairness among employees is a guiding force that influences employee attitude and behaviour. However, the mechanisms associated with justice need to be studied further. This study hypothesises that perceived organisational support (POS) mediates the relationship between organisational justice perceptions and affective commitment of employees. The study was conducted in a multi-national organisation operating in India in the service sector; the sample size was 71 employees. Baron...

  10. The Living Cell as a Multi-agent Organisation: A Compositional Organisation Model of Intracellular Dynamics

    Science.gov (United States)

    Jonker, C. M.; Snoep, J. L.; Treur, J.; Westerhoff, H. V.; Wijngaards, W. C. A.

    Within the areas of Computational Organisation Theory and Artificial Intelligence, techniques have been developed to simulate and analyse dynamics within organisations in society. Usually these modelling techniques are applied to factories and to the internal organisation of their process flows, thus obtaining models of complex organisations at various levels of aggregation. The dynamics in living cells are often interpreted in terms of well-organised processes, a bacterium being considered a (micro)factory. This suggests that organisation modelling techniques may also benefit their analysis. Using the example of Escherichia coli it is shown how indeed agent-based organisational modelling techniques can be used to simulate and analyse E.coli's intracellular dynamics. Exploiting the abstraction levels entailed by this perspective, a concise model is obtained that is readily simulated and analysed at the various levels of aggregation, yet shows the cell's essential dynamic patterns.

  11. Models of chromatin spatial organisation in the cell nucleus

    Science.gov (United States)

    Nicodemi, Mario

    2014-03-01

    In the cell nucleus chromosomes have a complex architecture serving vital functional purposes. Recent experiments have started unveiling the interaction map of DNA sites genome-wide, revealing different levels of organisation at different scales. The principles, though, which orchestrate such a complex 3D structure remain still mysterious. I will overview the scenario emerging from some classical polymer physics models of the general aspect of chromatin spatial organisation. The available experimental data, which can be rationalised in a single framework, support a picture where chromatin is a complex mixture of differently folded regions, self-organised across spatial scales according to basic physical mechanisms. I will also discuss applications to specific DNA loci, e.g. the HoxB locus, where models informed with biological details, and tested against targeted experiments, can help identifying the determinants of folding.

  12. Becoming organisms: the organisation of development and the development of organisation.

    Science.gov (United States)

    de la Rosa, Laura Nuño

    2010-01-01

    Despite the radical importance of embryology in the development of organicism, developmental biology remains philosophically underexplored as a theoretical and empirical resource to clarify the nature of organisms. This paper discusses how embryology can help develop the organisational definition of the organism as a differentiated, functionally integrated, and autonomous system. I distinguish two conceptions of development in the organisational tradition that yield two different conceptions of the organism: the life-history view claims that organisms can be considered as such during their whole ontogeny; the constitutive view distinguishes two periods in the life history, a period of generation and a period of self-maintenance of a constitutive organisation. Arguing in favour of the constitutive view, it will be claimed that the organisational criteria for the definition of organism (i.e., differentiation, functional integration, and autonomy) can only be applied to the developmental system when it has entered the period of self-maintenance of a constitutive organisation. Under the light of current research in developmental biology, it is possible to make explicit how organisms come to be as organisms. To this end, I explore key ontogenetic events that help us clarify the core aspects of animal organisation and allow us to identify the developmental stage that marks the ontological transition between an organism in potency and an organism in actuality. The structure of this ontogenetic unfolding parallels the conceptual structure of the very notion of organism; the generation of the being of a particular organism parallels its definition.

  13. Environmental Standard Review Plan for the review of a license application for a low-level radioactive waste disposal facility: Environmental report

    International Nuclear Information System (INIS)

    1987-04-01

    The Environmental Standard Review Plan (ESRP) (NUREG-1300) provides guidance to staff reviewers in the Office of Nuclear Material Safety and Safeguards who perform environmental reviews of environmental reports prepared by applicants in support of license applications to construct and operate new low-level radioactive waste disposal facilities. The individual ESRPs that constitute this document identify the information considered necessary to conduct the review, the purpose and scope of the review, the analysis procedure and evaluation, the formal input to the environmental statement, and the references considered appropriate for each review. The ESRP is intended to ensure quality and uniformity of approach in individual reviews as well as compliance with the National Environmental Policy Act of 1969. In addition, the ESRP will make information about the environmental component of the licensing process more readily available and thereby will serve to improve the understanding of this process among the public, States and regional compacts, and the regulated community

  14. Preparing as an organization, to submit or to review a construction license application for a DGR of ILW and HLW in France. French National Case - Andra - Preparing to Submit Cigeo's Creation License Application

    International Nuclear Information System (INIS)

    Boissier, Fabrice; Labalette, T.; Leverd, Pascal C.; Voinis, Sylvie

    2014-01-01

    The reversible repository in a deep geological formation is the French reference solution for the long-term management of high-level and intermediate-level long-lived radioactive waste. Since the first French Act on nuclear waste management research (1991), Andra has carried out twenty years of conceptual and basic studies on the subject, leading in particular to the feasibility demonstration in 2005 and to the choice of the detailed reconnaissance zone (ZIRA) in 2010. Taking advantage from this work, Andra has now reached a new phase where the project is engaging in the design of the industrial installation named Cigeo. At this stage, the further development of the project implies that Andra undertakes a multiplicity of actions in order to successfully reach various external and internal key milestones. Of paramount importance is the careful articulation between the regulatory authorization and decision processes and the outcome of the industrial installation design phases. In 2006 was built a regulatory framework that plans a succession of step by step decisions stages: 2013: Public debate on reversibility, memory keeping, environmental and health survey modalities, dialogue with the local stakeholders to harmoniously define and plan the external infrastructures that have to be developed to support the construction and the operation of Cigeo (roads, railway tracks and terminal, power and water supplies, etc.). 2015: Creation license application and start of the regulatory review process (notably various plans of the installation, the description of the solution envisaged for the closure of the facility, the preliminary safety case (operational safety, long-term safety, protection against malevolent actions, management of incidental situations, preliminary acceptance criteria), environmental impact studies (health, salubrity, transports, human activities, nature, patrimonial aspects). 2016-2017: new parliamentary Act on the reversibility conditions of the

  15. Organisational culture development in Klaipeda municipality

    OpenAIRE

    Paužuolienė, Jurgita; Mauricienė, Ingrida

    2012-01-01

    Organisational culture is an important management aspect of the organisation. It is formed by the organisation values, norms, underlying assumptions, attitudes, traditions, narratives, and symbols, it includes beliefs and habits. Organisational culture guides individual decisions and behaviours shared by a group of people. As a result, it can have a potent effect on well-being and success of the organisation. This paper presents the defining elements of the organisational cultural dimensions ...

  16. What it took to get an NRC license for centralized incineration

    International Nuclear Information System (INIS)

    DiSalvo, R.; Zielenbach, W.

    1987-01-01

    In 1982, Battelle joined five other commercial generators of low level radioactive waste in conducting a study of the technical and economic feasibility and the licensability of a central facility for incinerating LLW. The project generated a license application to the USNRC and supporting documentation related to the safety and environmental impacts of the facility. After thorough review, the NRC has issued a Finding of No Significant Impact and the associated license authorization, which is the first of its kind for an incineration facility

  17. Licensing process for safety-critical software-based systems

    Energy Technology Data Exchange (ETDEWEB)

    Haapanen, P. [VTT Automation, Espoo (Finland); Korhonen, J. [VTT Electronics, Espoo (Finland); Pulkkinen, U. [VTT Automation, Espoo (Finland)

    2000-12-01

    System vendors nowadays propose software-based technology even for the most critical safety functions in nuclear power plants. Due to the nature of software faults and the way they cause system failures new methods are needed for the safety and reliability evaluation of these systems. In the research project 'Programmable automation systems in nuclear power plants (OHA)', financed together by the Radiation and Nuclear Safety Authority (STUK), the Ministry of Trade and Industry (KTM) and the Technical Research Centre of Finland (VTT), various safety assessment methods and tools for software based systems are developed and evaluated. As a part of the OHA-work a reference model for the licensing process for software-based safety automation systems is defined. The licensing process is defined as the set of interrelated activities whose purpose is to produce and assess evidence concerning the safety and reliability of the system/application to be licensed and to make the decision about the granting the construction and operation permissions based on this evidence. The parties of the licensing process are the authority, the licensee (the utility company), system vendors and their subcontractors and possible external independent assessors. The responsibility about the production of the evidence in first place lies at the licensee who in most cases rests heavily on the vendor expertise. The evaluation and gauging of the evidence is carried out by the authority (possibly using external experts), who also can acquire additional evidence by using their own (independent) methods and tools. Central issue in the licensing process is to combine the quality evidence about the system development process with the information acquired through tests, analyses and operational experience. The purpose of the licensing process described in this report is to act as a reference model both for the authority and the licensee when planning the licensing of individual applications

  18. Licensing process for safety-critical software-based systems

    International Nuclear Information System (INIS)

    Haapanen, P.; Korhonen, J.; Pulkkinen, U.

    2000-12-01

    System vendors nowadays propose software-based technology even for the most critical safety functions in nuclear power plants. Due to the nature of software faults and the way they cause system failures new methods are needed for the safety and reliability evaluation of these systems. In the research project 'Programmable automation systems in nuclear power plants (OHA)', financed together by the Radiation and Nuclear Safety Authority (STUK), the Ministry of Trade and Industry (KTM) and the Technical Research Centre of Finland (VTT), various safety assessment methods and tools for software based systems are developed and evaluated. As a part of the OHA-work a reference model for the licensing process for software-based safety automation systems is defined. The licensing process is defined as the set of interrelated activities whose purpose is to produce and assess evidence concerning the safety and reliability of the system/application to be licensed and to make the decision about the granting the construction and operation permissions based on this evidence. The parties of the licensing process are the authority, the licensee (the utility company), system vendors and their subcontractors and possible external independent assessors. The responsibility about the production of the evidence in first place lies at the licensee who in most cases rests heavily on the vendor expertise. The evaluation and gauging of the evidence is carried out by the authority (possibly using external experts), who also can acquire additional evidence by using their own (independent) methods and tools. Central issue in the licensing process is to combine the quality evidence about the system development process with the information acquired through tests, analyses and operational experience. The purpose of the licensing process described in this report is to act as a reference model both for the authority and the licensee when planning the licensing of individual applications. Many of the

  19. Organisational Structures & Considerations

    NARCIS (Netherlands)

    Luiijf, H.A.M.; Healey, J.

    2012-01-01

    The purpose of this section is to review specific types of national cyber security (NCS) areas (also called ‘mandates’) and examine the organisational and collaborative models associated with them. Before discussing the wide variety of organisational structures at the national and international

  20. Luhmann og Organisation

    DEFF Research Database (Denmark)

    Paulsen, Michael

    LUHMANN OG ORGANISATION Organisationsstudier spiller en særlig rolle for den tyske sociolog Niklas Luhmann (1927-1998) idet han begriber organisationer som det mest afgørende socialsystem i det moderne samfund. Kun organisati-oner kan træffe samfundsmæssige afgørelser. Faktisk begyndte Luhmann som...... organisationsteoretiker, og flere af hans tidlige værker regnes nu som milepæle indenfor organisations-studier. I 2000 udkom post humt hans sidste store organisationsteoretiske værk Organisation und Entscheidung. I Luhmanns almene systemteori trækker han kraftigt på sit kendskab til organisationer. Begribelsen af...... samtidig med, at de kan skabe en kobling mellem det moderne samfunds interaktioner og funktionssystemer. Luhmanns konstante ledetråd har været, at organisationer er det, som får samfun-det til at fungere. Uden organisationer intet moderne samfund. Luhmann og organisation henvender sig til studerende...

  1. Licensing process characteristics of Small Modular Reactors and spent nuclear fuel repository

    Energy Technology Data Exchange (ETDEWEB)

    Söderholm, Kristiina, E-mail: kristiina.soderholm@fortum.com [Fortum Power (Finland); Tuunanen, Jari, E-mail: jari.tuunanen@fortum.com [Fortum Power (Finland); Amaba, Ben, E-mail: baamaba@us.ibm.com [IBM Complex Systems (United States); Bergqvist, Sofia, E-mail: sofia.bergqvist@se.ibm.com [IBM Rational Software (Sweden); Lusardi, Paul, E-mail: plusardi@nuscalepower.com [NuScale Power (United States)

    2014-09-15

    Highlights: • We examine the licensing process challenges of modular nuclear facilities. • We compare the features of Small Modular Reactors and spent nuclear fuel repository. • We present the need of nuclear licensing simplification. • Part of the licensing is proposed to be internationally applicable. • Systems engineering and requirements engineering benefits are presented. - Abstract: This paper aims to increase the understanding of the licensing processes characteristics of Small Modular Reactors (SMR) compared with licensing of spent nuclear fuel repository. The basis of the SMR licensing process development lies in licensing processes used in Finland, France, the UK, Canada and the USA. These countries have been selected for this study because of their various licensing processes and recent actions in the new NPP construction. Certain aspects of the aviation industry licensing process have also been studied and selected practices have been investigated as possibly suitable for use in nuclear licensing. Suitable features for SMR licensing are emphasized and suggested. The licensing features of the spent nuclear fuel deep repository along with similar features of SMR licensing are discussed. Since there are similar types of challenges of lengthy licensing time frames, as well as modular features to be taken into account in licensing, these two different nuclear industry fields can be compared. The main SMR features to take into account in licensing are: • Standardization of the design. • Modularity. • Mass production. • Serial construction. Modularity can be divided into two different categories: the first category is simply a single power plant unit constructed of independently engineered modules (e.g. construction process for Westinghouse AP-1000 NPP) and the second one a power plant composed of many reactor modules, which are manufactured in factories and installed as needed (e.g. NuScale Power SMR design). The deep underground repository

  2. Economics of license renewal in the U.S. - entergy's perspective

    International Nuclear Information System (INIS)

    Young, Garry G.

    2003-01-01

    License renewal of operating nuclear plants in the United States has become one of the most successful U.S. nuclear regulatory activities in the past few years. In 1995, the U.S. Nuclear Regulatory Commission (NRC) published a revised rule in 10 CFR Part 54 that provided the requirements for an operating nuclear plant to seek license renewal. At that time, many people believed that only a select few operating nuclear plants would pursue license renewal and that most plants would operate for no more than 40 years. By mid-2003, the owners of approximately 52% of the U.S. nuclear fleet of 103 operating nuclear plants have decided to pursue license renewal and more are expected to follow. This change in direction since 1995 can be attributed to the improving economics of U.S. nuclear power plant operation and to the improved regulatory process resulting from the 1995 revision to 10 CFR Part 54. In 2000, Entergy submitted a license renewal application for Arkansas Nuclear One, Unit 1 (ANO-1). This application was the third to be submitted to the NRC at a time when it was still unclear how successful the regulatory process might be. However, less than 17 months later, in June 2001, the NRC granted a renewed operating license for ANO-1 at a total cost of approximately $11 million. Due in part to the ANO-1 license renewal success, Entergy now has tentative plans to pursue license renewal for the entire fleet of operating nuclear power plants. Without license renewal, Entergy's current nuclear fleet capacity of approximately 9,000 MW(e) would begin to decline in 2012. With license renewal, Entergy's nuclear fleet capacity can remain in place until 2032. This projection does not include the expected improvements in capacity due to power uprate that is currently planned. The combination of power uprate and license renewal will add significant economic value to Entergy's nuclear fleet. One of the major factors in strong performance is capacity factor. In 1990, the average

  3. Identification and assessment of organisational factors related to the safety of NPPs - State-of-the-Art Report

    International Nuclear Information System (INIS)

    Baumont, Genevieve; Bourrier, Mathilde; Frischknecht, Albert; Schoenfeld, Isabelle; Weber, Mike J.

    1999-01-01

    organisational culture, organisational knowledge, and organisational learning have a slightly different interpretation and will need further discussions to reach a common definition. Although the definitions of these factors may differ slightly for each country, it is important to emphasize that they were all considered to have an influence on plant safety performance. The SOAR also presents information about assessment approaches used in the three environments: - Two utilities detail their self assessment practices. - The regulatory bodies assessment approaches, as presented in the report, include a description of the context and framework of their assessment methods or approaches, and in some cases, more detailed information on their methodology. - The researcher information comes from two types of research: university-based research (as well as from public and private laboratories) and contractor-based research which may be sponsored by the regulatory body or the utility. This information is introduced by a brief background of current research trends. The assessment methods can be distinguished between two applications. The first application of the assessment method results from detection of organisational weaknesses in events or inspections, or from continuing deteriorating performance. The assessment tries to find root causes and contributing causes of the identified weaknesses in the organisation. This application is considered 'reactive'. The references for this approach are requirements of the regulatory body or utility commitments, or the legal framework. The second application assesses the organisational factors as leading indicators of performance problems. This application is considered 'proactive', integrating information on organisational factors in order to capture mechanisms which are very important for the reliability of the organisation. This could be the decision-making process, change process, coherence of the organisation with the policy, etc. Lastly, the

  4. Identification and assessment of organisational factors related to the safety of NPPs - State-of-the-Art Report

    International Nuclear Information System (INIS)

    Baumont, Genevieve; Bourrier, Mathilde; Frischknecht, Albert; Schoenfeld, Isabelle; Weber, Mike J.

    1999-09-01

    applications. The first application of the assessment method results from detection of organisational weaknesses in events or inspections, or from continuing deteriorating performance. The assessment tries to find root causes and contributing causes of the identified weaknesses in the organisation. This application is considered 'reactive'. The references for this approach are requirements of the regulatory body or utility commitments, or the legal framework. The second application assesses the organisational factors as leading indicators of performance problems. This application is considered 'proactive', integrating information on organisational factors in order to capture mechanisms which are very important for the reliability of the organisation. This could be the decision-making process, change process, coherence of the organisation with the policy, etc. Lastly, the participants identified several research needs for the identification and assessment of organisational factors, including the importance of international co-operation: - assessing the impact of organisational factors on human safety performance; - transferring of knowledge and developing a common metric amongst Member countries for comparing methods and audit practices; - establishing a common understanding of specific organisational mechanisms, features and patterns; - exchanging operational performance data for analysing the risk significance of organisational factors; - exchanging information in two to three years to discuss progress in concepts; - establishing theories and methodology, identifying risk significance and quantifying organisational factors

  5. TEDx Organisers meet at CERN

    CERN Multimedia

    Abha Eli Phoboo

    2013-01-01

    CERN hosted the second TEDx European Organisers meeting last week with around 80 organisers attending from all over Europe. They were given an introduction to CERN and a tour of the LHC experiments.   The participants of the TEDx European Organisers meeting held at CERN last week. Among the attendees was Bruno Giussani, European director of TED, who delivered the welcome address. The TEDx European organisers shared their experiences in workshops and brainstormed about how to work on different aspects of organising a TEDx event, and about improving the relationship between TEDx and TED. “The goal of this meeting was for veteran TEDx organisers to help younger ones, help each other, bring the community together and have better quality events,” said Claudia Marcelloni, head of TEDxCERN. TEDx is an independently organised TED (Technology, Entertainment, Design) talk event, which has grown exponentially all over the world. There are hundreds of TEDx events every day and it n...

  6. The relationship between organisational climate and employee satisfaction in a South African information and technology organisation

    Directory of Open Access Journals (Sweden)

    Monia L. Castro

    2010-05-01

    Research purpose: The objective of this study was to explore the relationship between organisational climate and job satisfaction to determine whether employees’ perceptions of the work environment influence their level of job satisfaction. Motivation for the study: Organisations are facing more challenges than ever before. These challenges are not unique to any specific organisation or industry, but affect all organisations.Organisational climate in particular is constantly challenged by changes impacting organisations today. Research design, approach and method: An organisational climate questionnaire was administered to a convenience sample of 696 employees from a population of 1453 employees working in three regions in which the organisation was operational. Confirmatory and exploratory factor analyses were used to investigate the structure of the climate model. Main findings: The revised 12-factor model (after the confirmatory factor analysis fitted the data best and the researchers therefore decided to proceed with the revised 12-factor model (11 dimensions for further analysis. A stepwise regression was conducted and nine dimensions of organisational climate were found to predict job satisfaction. The results indicated a strong positive correlation (r = 0.813, p< 0.01 between organisational climate and the dependent variable of job satisfaction. Practical implications: This study provided support for the view that line managers and human resource practitioners should be aware that different biographical groups have different needs that can influence their job satisfaction levels and different perceptions of the climate within the organisation and that this impacts on their behaviour. Contribution: The findings of this study indicated a positive relationship between organisational climate scores and job satisfaction scores and thus, regardless of how the dimensions are perceived, organisational climate has an influence on job satisfaction.

  7. Exploring the Interconnectedness among Strategy Development, Shared Mental Models, Organisational Learning and Organisational Change

    Science.gov (United States)

    Malan, Renee

    2011-01-01

    The cognitive psychological processes related to learning and change behaviour are factors that impact on organisational strategy development. Strategy development is dependent on strategic thinking that is reciprocally influenced by shared mental models, organisational learning and organisational change. Although strategy development, shared…

  8. Exploring the adoption of Schwartz Center Rounds as an organisational innovation to improve staff well-being in England, 2009-2015.

    Science.gov (United States)

    Robert, Glenn; Philippou, Julia; Leamy, Mary; Reynolds, Ellie; Ross, Shilpa; Bennett, Laura; Taylor, Cath; Shuldham, Caroline; Maben, Jill

    2017-01-05

    Schwartz Center Rounds ('Rounds') are a multidisciplinary forum in which healthcare staff within an organisation discuss the psychological, emotional and social challenges associated with their work in a confidential and safe environment. Implemented in over 375 North American organisations, since 2009, they have been increasingly adopted in England. This study aimed to establish how many and what types of organisations have adopted Rounds in England, and to explore why they did so. Public healthcare organisations in England. Secondary data analysis was used to map and profile all 116 public healthcare organisations that had adopted Rounds in England by July 2015. Semistructured telephone interviews were conducted with 45 Round coordinators within adopting organisations. The rate of adoption increased after a major national report in 2013. Rounds were typically adopted in order to improve staff well-being. Adopting organisations scored better on staff engagement than non-adopters; among adopting organisations, those performing better on patient experience were more likely to adopt earlier. Most adoption decision-making processes were straightforward. A confluence of factors-a generally favourable set of innovation attributes (including low cost), advocacy from opinion leaders in different professional networks, active dissemination by change agents and a felt need to be seen to be addressing staff well-being-initially led to Rounds being seen as 'an idea whose time had come'. More recent adoption patterns have been shaped by the timing of charitable and other agency funding in specific geographical areas and sectors, as well as several forms of 'mimetic pressure'. The innate attributes of Rounds, favourable circumstances and the cumulative impact of a sequence of distinct informal and formal social processes have shaped the pattern of their adoption in England. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a

  9. The alignment of espoused values and organisational culture at a South African parastatal organisation

    OpenAIRE

    2012-01-01

    M.Comm. The primary purpose of the present study was to identify whether the organisational culture of the Transmission Division of Eskom is aligned to its stated values. In seeking to reach this objective, it was necessary to assess the gap between espoused and practised organisational values. The study also sought to identify the Transmission Division’s organisational culture. A correlation between the stated values and identified organisational culture was calculated and this was used t...

  10. 75 FR 3217 - J&T Hydro Company; H. Dean Brooks and W. Bruce Cox; Notice of Application for Transfer of License...

    Science.gov (United States)

    2010-01-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11392-009] J&T Hydro Company; H. Dean Brooks and W. Bruce Cox; Notice of Application for Transfer of License and Soliciting Comments and Motions To Intervene January 12, 2010. On October 30, 2009, J&T Hydro Company (transferor) and...

  11. Strategising through organising

    DEFF Research Database (Denmark)

    Larsen, Mette Vinther

    and sensemaking point of view. It argues that actors’ strategising is closely connected to their organising. Maybe strategising and organising co-constitute each other? It is a perspective that looks at strategy as emergent wayfinding more than planned navigating. In the attempts to make sense...... of and operationalise a strategy, maybe actors do not follow a pre-defined map, but instead figure out the way as they go? Maybe actors go in ways that they relationally believe are the ‘right ones’ and in ways that make sense to them? There are, however, many actors in an organisation and, therefore, also many ways...

  12. Licensing Support Network: An Electronic Discovery System

    International Nuclear Information System (INIS)

    Gil, A. V.; Jensen, D.; McKinnon, B.

    2002-01-01

    The necessary authorization for the U. S. Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) to submit a License Application (LA) is contingent upon the policy process defined in the Nuclear Waste Policy Act, as amended (NWPA), with some steps yet to occur. In spite of this uncertainty, the DOE must take prudent and appropriate action now, and over the next several years, to prepare for submittal of an application and to facilitate the U. S. Nuclear Regulatory Commission (NRC) review of this application, if the Yucca Mountain site is recommended and approved for repository development. One of these steps the DOE has taken involves working with the NRC's Advisory Review Panel to develop Licensing Support Network (LSN) requirements and guidelines. The NRC has made a prototype of the LSN web page available at www.LSNNET.gov. The OCRWM part of the LSN currently has an indefinite life cycle and may need to remain in existence until the repository is closed, which could be as long as 325 years

  13. 37 CFR 5.25 - Petition for retroactive license.

    Science.gov (United States)

    2010-07-01

    ... invention of a pending application and no petition under § 1.181 has been filed, a final rejection of the..., DEPARTMENT OF COMMERCE GENERAL SECRECY OF CERTAIN INVENTIONS AND LICENSES TO EXPORT AND FILE APPLICATIONS IN... be renewed. Failure to renew the petition within the set time period will result in a final denial of...

  14. Image simulation for automatic license plate recognition

    Science.gov (United States)

    Bala, Raja; Zhao, Yonghui; Burry, Aaron; Kozitsky, Vladimir; Fillion, Claude; Saunders, Craig; Rodríguez-Serrano, José

    2012-01-01

    Automatic license plate recognition (ALPR) is an important capability for traffic surveillance applications, including toll monitoring and detection of different types of traffic violations. ALPR is a multi-stage process comprising plate localization, character segmentation, optical character recognition (OCR), and identification of originating jurisdiction (i.e. state or province). Training of an ALPR system for a new jurisdiction typically involves gathering vast amounts of license plate images and associated ground truth data, followed by iterative tuning and optimization of the ALPR algorithms. The substantial time and effort required to train and optimize the ALPR system can result in excessive operational cost and overhead. In this paper we propose a framework to create an artificial set of license plate images for accelerated training and optimization of ALPR algorithms. The framework comprises two steps: the synthesis of license plate images according to the design and layout for a jurisdiction of interest; and the modeling of imaging transformations and distortions typically encountered in the image capture process. Distortion parameters are estimated by measurements of real plate images. The simulation methodology is successfully demonstrated for training of OCR.

  15. Patient and organisational variables associated with pressure ulcer prevalence in hospital settings: a multilevel analysis.

    Science.gov (United States)

    Bredesen, Ida Marie; Bjøro, Karen; Gunningberg, Lena; Hofoss, Dag

    2015-08-27

    To investigate the association of ward-level differences in the odds of hospital-acquired pressure ulcers (HAPUs) with selected ward organisational variables and patient risk factors. Multilevel approach to data from 2 cross-sectional studies. 4 hospitals in Norway were studied. 1056 patients at 84 somatic wards. HAPU. Significant variance in the odds of HAPUs was found across wards. A regression model using only organisational variables left a significant variance in the odds of HAPUs across wards but patient variables eliminated the across-ward variance. In the model including organisational and patient variables, significant ward-level HAPU variables were ward type (rehabilitation vs surgery/internal medicine: OR 0.17 (95% CI 0.04 to 0.66)), use of preventive measures (yes vs no: OR 2.02 (95% CI 1.12 to 3.64)) and ward patient safety culture (OR 0.97 (95% CI 0.96 to 0.99)). Significant patient-level predictors were age >70 vs organisation of care improvements, that is, by improving the patient safety culture and implementation of preventive measures. Some wards may prevent pressure ulcers better than other wards. The fact that ward-level variation was eliminated when patient-level HAPU variables were included in the model indicates that even wards with the best HAPU prevention will be challenged by an influx of high-risk patients. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  16. The effects of perceived organisational support and span of control on the organisational commitment of novice leaders.

    Science.gov (United States)

    Havaei, Farinaz; Dahinten, V Susan; MacPhee, Maura

    2015-04-01

    The purpose of this study was to examine the main and interaction effects of perceived organisational support, span of control and leadership rank on novice nurse leaders' organisational commitment. As nurse leaders' organisational commitment is eroded at times of healthcare restructuring, it is important to study factors associated with organisational commitment. Cross-sectional data from 69 novice nurse leaders, collected via mailed surveys at two time points, were analysed using hierarchical regression. The findings supported our hypotheses about the positive effect of perceived organisational support, the positive effect of leadership rank and the negative effect of span of control on novice nurse leaders' organisational commitment. In addition, perceived organisational support was shown to moderate the negative effect of span of control on novice nurse leaders' organisational commitment at time 2. Organisational strategies aimed at supporting nurse leaders, and attention to span of control, are required to enhance the organisational commitment of novice nurse leaders. Nurse leaders with a wide span of control, in particular those with little leadership experience, need to adopt leadership strategies that maximise their effectiveness, such as organising smaller work groups or teams within their wide span of control. © 2013 John Wiley & Sons Ltd.

  17. Secure matching of Dutch car license plates

    NARCIS (Netherlands)

    Sunil, A.B.; Erkiny, Z.; Veugenyz, T.

    2016-01-01

    License plate matching plays an important role in applications like law enforcement, traffic management and road pricing, where the plate is first recognized and then compared to a database of authorized vehicle registration plates. Unfortunately, there are several privacy related issues that should

  18. Application of the defense-in-depth concept to qualify computer-based instrumentation and control systems important to safety

    International Nuclear Information System (INIS)

    Seidel, F.

    1998-01-01

    In parallel to the technological development, the authorities and expert organisations are preparing the application of computer-based I and C to NPPs from the regulatory point of view. Generally the associated world-wide procedure follows steps like identification of safety issues, completion of the regulatory framework particularly regarding the licensing requirements and furthermore, recommendation of an appropriate set of qualification methods to prove that the requirements are met. The paper's intention is to show from the regulatory point of view that the choice as well as the combination of the qualification methods depend on system design features and development strategy. Similar as for the safety system design required, a defense-in-depth qualification concept is suggested to be helpful in order to prove that the computer-based system meets the licensing requirements. (author)

  19. Application of the defense-in-depth concept to qualify computer-based instrumentation and control systems important to safety

    Energy Technology Data Exchange (ETDEWEB)

    Seidel, F [Federal Office for Radiation Protection, Salzgitter (Germany)

    1998-10-01

    In parallel to the technological development, the authorities and expert organisations are preparing the application of computer-based I and C to NPPs from the regulatory point of view. Generally the associated world-wide procedure follows steps like identification of safety issues, completion of the regulatory framework particularly regarding the licensing requirements and furthermore, recommendation of an appropriate set of qualification methods to prove that the requirements are met. The paper`s intention is to show from the regulatory point of view that the choice as well as the combination of the qualification methods depend on system design features and development strategy. Similar as for the safety system design required, a defense-in-depth qualification concept is suggested to be helpful in order to prove that the computer-based system meets the licensing requirements. (author)

  20. 10 CFR 32.61 - Ice detection devices containing strontium-90; requirements for license to manufacture or...

    Science.gov (United States)

    2010-01-01

    ...; requirements for license to manufacture or initially transfer. 32.61 Section 32.61 Energy NUCLEAR REGULATORY COMMISSION SPECIFIC DOMESTIC LICENSES TO MANUFACTURE OR TRANSFER CERTAIN ITEMS CONTAINING BYPRODUCT MATERIAL... manufacture or initially transfer. An application for a specific license to manufacture or initially transfer...