WorldWideScience

Sample records for licensing application organisation

  1. Product Licenses Database Application

    CERN Document Server

    Tonkovikj, Petar

    2016-01-01

    The goal of this project is to organize and centralize the data about software tools available to CERN employees, as well as provide a system that would simplify the license management process by providing information about the available licenses and their expiry dates. The project development process is consisted of two steps: modeling the products (software tools), product licenses, legal agreements and other data related to these entities in a relational database and developing the front-end user interface so that the user can interact with the database. The result is an ASP.NET MVC web application with interactive views for displaying and managing the data in the underlying database.

  2. IRIS pre-application licensing

    International Nuclear Information System (INIS)

    Carelli, Mario D.; Kling, Charles L.; Ritterbusch, Stanley E.

    2003-01-01

    This paper presents the approach to pre-application licensing by the International Reactor Innovative and Secure (IRIS), and advanced, integral reactor design with a thermal power of 1000 MW. The rationale for the pre-application licensing is discussed. Since IRIS technology is based on proven LWR experience, the project will rely on AP600/AP1000 precedent and will focus during the pre-application on long lead and novel items. A discussion of the evolution of the project to significantly reduce licensing issues is provided, followed by a summary of the IRIS safety-by-design which provides a formidable first step in the Defense in Depth approach. The effects of the safety-by-design, as well as of passive systems, on the IRIS safety will be investigated in a proposed testing program that will be reviewed by NRC during the pre-application. Documentation to be provided to NRC is discussed. Early design analyses indicate that the benefits of the IRIS safety-by-design approach are so significant that the basic premise of current emergency planning regulations (i.e., likelihood of core damage) will be reduced to the extent that special emergency response planning beyond the exclusion area boundary may not be needed. How this very significant outcome can be effected through a highly risk-informed licensing is discussed. (author)

  3. 14 CFR 431.73 - Continuing accuracy of license application; application for modification of license.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Continuing accuracy of license application; application for modification of license. 431.73 Section 431.73 Aeronautics and Space COMMERCIAL SPACE... Conditions § 431.73 Continuing accuracy of license application; application for modification of license. (a...

  4. Review process for license renewal applications

    International Nuclear Information System (INIS)

    Craig, John W.; Kuo, P.T.

    1991-01-01

    In preparation for license renewal reviews, the Nuclear Regulatory Commission has recently published for public review and comment a proposed rule for license renewal and a draft Standard Review Plan as well as a draft Regulatory Guide relating to the implementation of the proposed rule. In support of future license renewal applications, the nuclear industry has also submitted 11 industry reports for NRC review and approval. This paper briefly describe how these parallel regulatory and industry activities will be factored into the NRC review process for license renewal. (author)

  5. 21 CFR 515.10 - Medicated feed mill license applications.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Medicated feed mill license applications. 515.10... (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Applications § 515.10 Medicated feed mill license applications. (a) Medicated feed mill license applications (Forms FDA 3448) may...

  6. Personality traits of Turkish handgun license applicants.

    Science.gov (United States)

    Selek, Salih; Can, Serdar S; Yabanoglu, Ihsan

    2012-10-01

    Several theories have sought to explain the motivations for handgun possession and the relationship with personality. Perception of handguns also has cultural variations. The aim of the study is to evaluate handgun license applicants' personality profiles. 109 handgun license applicants were included in the study. Temperament and Character Inventory (TCI) scores of the applicants were recorded. Scores were compared with Turkish and American normative data for the Inventory. The study group had significantly lower subscores on novelty seeking, harm avoidance, and higher subscores on reward dependence and persistence compared to Turkish norms and significantly lower subscores on novelty seeking, reward dependence, and self-directedness compared to American norms. Results indicate that Turkish handgun license applicants' personality features are more similar to American norms.

  7. 75 FR 46938 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-08-04

    ... Logistics LLC (NVO), 120 S. Woodland Blvd., 216, DeLand, FL 32720, Officers: Dietmar Lutte, Manager Member, (Qualifying Individual), Susan Lutte, Member, Application Type: New NVO License. Bridgeline Logistics..., (Qualifying Individual), Application Type: New OFF License. [[Page 46939

  8. Organisation

    DEFF Research Database (Denmark)

    Lindkvist, Pia

    Du vil som læser få et indblik i, hvordan omgivelsernes ændrede krav til virksomhederne ændrer på organisations- og ledelsesteorien. Baggrunden for ”Organisation – videregående uddannelser” er, at give dig egenskaberne til at analysere og vurdere ledelsesmæssige og organisatoriske problemer...

  9. 75 FR 72824 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-11-26

    ... & OFF License. Everglory Logistics, Inc. (NVO & OFF), 440 McClellan Highway, 105F2, East Boston, MA..., Application Type: New NVO & OFF License. Hawaii Intermodal Tank Transport, LLC (NVO & OFF), 2350 S. Dock... Tran, Manager, Application Type: New NVO & OFF License. ITL USA Inc. dba International Transport...

  10. 75 FR 80499 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-12-22

    ... Individual), Jeffrey Cullen, President. Application Type: QI Change. Cala Distribution, LLC (NVO), 2705 NW..., (Qualifying Individual), William S. Askew, Manager. Application Type: New NVO License. Encar Trading, Corp...

  11. 78 FR 20106 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-04-03

    ... M. Tsai, President (QI). Application Type: New NVO License. American International Shipping Company... Type: New NVO License. Nippon Concept America, LLC (OFF), 2203 Timberloch Place, Suite 218D, The...

  12. Organisation

    DEFF Research Database (Denmark)

    Sørensen, Henrik B.; Hansen, Kaj; Heide, Asbjørn

    Bogen giver en indføring i de centrale emner indenfor organisation og ledelse. Bogen henvender sig især til akademi- og diplomuddannelserne samt uddannelser til professionsbachelorer, der alle har et anvendelsesorienteret formål. Endvidere henvender bogen sig til uddannelser og kurser, der...... beskæftiger sig med ledelse og organisation på et videregående niveau. Til bogen er der udarbejdet en lang række supplerende materialer til undervisere og studerende i form af opgaver og cases, test med tilhørende svar, vejledninger i opgaveløsning og projektarbejde. dette univers kan findes på bogens...... hjemmeside på www.organisation.academica.dk...

  13. Application of relationship marketing in non-profit organisations ...

    African Journals Online (AJOL)

    Application of relationship marketing in non-profit organisations involved in the provision of sport and recreational services. ... A variety of factors have over time contributed to a need for marketing in non-profit ... AJOL African Journals Online.

  14. 77 FR 59193 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-09-26

    ... Type: New OFF License. Bring Logistics US, Inc. (NVO & OFF), 4500 N. Sam Houston Parkway W., 130...: New NVO & OFF License. Contract Logistics, LLC (NVO & OFF), 4911 N. Portland Avenue, Suite 200.... Roush, Manager, Application Type: New NVO & OFF License. Crescent Line Inc. dba Globe Express Services...

  15. 76 FR 70145 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-11-10

    ...). Application Type: New NVO License. Alomar Transport, Inc. (NVO & OFF), 150-30 132nd Avenue, Suite 303, Jamaica... & OFF License. Forward System Logistics Inc. (NVO), 144-54 156th Street, Jamaica, NY 11434. Officers... NVO License. Green Line Shipping & Logistics Services Inc. (NVO & OFF), 16230 Lake View Lane, Apple...

  16. Application of up-front licensing

    International Nuclear Information System (INIS)

    Grant, S.D.; Snell, V.G.

    1995-01-01

    AECL has been pioneering 'up-front' licensing of new reactor designs. The CANDU 3 design has been formally reviewed by AECB staff for a number of years. The CANDU 9 design has just started the up-front licensing process. The process gives designers, regulators and potential customers early confidence in the licensability of future plants. (author). 4 refs., 2 tabs

  17. Application of up-front licensing

    Energy Technology Data Exchange (ETDEWEB)

    Grant, S D [Atomic Energy of Canada Ltd., Saskatoon, SK (Canada); Snell, V G [Atomic Energy of Canada Ltd., Mississauga, ON (Canada)

    1996-12-31

    AECL has been pioneering `up-front` licensing of new reactor designs. The CANDU 3 design has been formally reviewed by AECB staff for a number of years. The CANDU 9 design has just started the up-front licensing process. The process gives designers, regulators and potential customers early confidence in the licensability of future plants. (author). 4 refs., 2 tabs.

  18. 75 FR 20997 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-04-22

    ... 77354. Officers: Thomas C. Gaze, President, Qualifying Individual). Lori L. Gaze, Secretary/Treasurer... Services, (Qualifying Individual). George T. Cook, President/Treasurer, Application Type: New OFF License...

  19. 25 CFR 141.9 - Application for license renewal.

    Science.gov (United States)

    2010-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES BUSINESS PRACTICES ON... the applicant has made as a reservation business owner and the applicant's present fitness to reside... pending consideration of application for license renewal. (c) Prior to expiration of the existing license...

  20. LTO License Application Project NPP Borssele

    International Nuclear Information System (INIS)

    Jong, A.E. de; Blom, F.J.; Leilich, J.

    2012-01-01

    Borssele NPP plans to extend its operating life with 20 years until 2034. Borssele has started the project LTO 'bewijsvoering' (LTO 'Justification') in order to meet the requirements of the Dutch regulator. The outline of the project is based on IAEA safety guide 57 'Safe Long Term Operation of Nuclear Power Plants'. This paper describes the contents and coherence of the different parts in the project and how these respond to the IAEA guidelines on LTO. The goal of the project LTO 'bewijsvoering' is to ensure that safety and safety relevant systems, structures and components continue to perform their intended functions during long term operation. The outcome of the project LTO 'bewijsvoering' will be used for a license change application and this will be submitted to the Dutch regulator KFD for approval of prolonged operation of Borssele NPP after 2013. (author)

  1. 77 FR 20398 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-04-04

    ...), Svi Soudai, Manager, Application Type: New OFF License. Armada USA, LLC dba Armada Logistics (NVO... Logistics (NVO & OFF), 435 Division Street, Elizabeth, NJ 07076, Officer: Carlos E. Feliu, President.../Treasurer, (Qualifying Individual), Application Type: New NVO License. HYC Logistics, Inc. (NVO & OFF), 2600...

  2. 76 FR 44330 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-07-25

    .... Nguyen, Secretary/CFO, Application Type: New NVO & OFF License. Atlas Logistics LLC (NVO & OFF), 2801 NW...), Application Type: New NVO & OFF License. Bulk Cargo Services & Logistics Inc. (OFF), 15400 N.E. 103rd Drive..., Member/Chief Executive Manager, (Qualifying Individual), Stina Storr, Member/ Managing Member...

  3. 77 FR 24712 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-04-25

    ... Global Logistics LLC (OFF), 9816 Whithorn Drive, Suite B, Houston, TX 77095, Officer: Herbert R. Hogg, Operating Manager (Qualifying Individual), Application Type: New OFF License. Toyo Logistics America, Inc... Individual), Application Type: New NVO License. Choiceone Logistics, Inc. (NVO & OFF), 10025 NW 116th Way, 17...

  4. 78 FR 66713 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-11-06

    ..., Washington, DC 20573, by telephone at (202) 523-5843 or by email at [email protected] . Action One Logistics, Inc..., Operating Manager (QI), Joseph Lam, Member, Application Type: New NVO License. Altex US, LLC (NVO & OFF), 1... President, Application Type: New NVO & OFF License. Andes Logistics USA LLC (NVO & OFF) 7500 NW 25 Street, 7...

  5. 76 FR 79682 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-12-22

    ... at (202) 523-5843 or by email at [email protected] . A.C.T. Logistics, LLC (NVO), 154-09 146th Avenue, 3rd...-President/Secretary. Application Type: License Transfer. Canyon Global Logistics, LLC (NVO & OFF), 2928-B..., General Manager, (Qualifying Individual), Oleg Ardachev, President. Application Type: New OFF License...

  6. 75 FR 61757 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-10-06

    ...), Jinho Um, CFO. Application Type: New NVO & OFF License. Junction Int'l Logistics, Inc. (NVO), 17870 Castleton Street, Suite 107, City of Industry, CA 91748. Officers: Charles Kuo, Secretary (Qualifying.... Application Type: New NVO & OFF License. Red Arrow Consulting, Inc. dba Red Arrow Logistics (OFF), 14925 SE...

  7. 76 FR 30360 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-05-25

    .... Application Type: Trade Name Change. B&O Logistics, Inc. (NVO), 19310 Pacific Gateway Drive, Torrance, CA.... Application Type: New NVO License. Charity Cargo L.L.C. (NVO & OFF), 1423 Kaleilani Street, Pearl City, HI... License. GreenLine Trade, LLC dba GreenLine Logistics (OFF), 14205 SE 36th, Suite 100, Bellevue, WA 98006...

  8. 77 FR 71002 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-11-28

    ..., Washington, DC 20573, by telephone at (202) 523-5843 or by email at [email protected] . 5G Logistics Solutions LLC..., President. Application Type: New NVO & OFF License. Bennett International Transport, L.L.C. (NVO & OFF.... Castano, COO. Application Type: New NVO & OFF License. James J. Boyle & Co. dba JJB Global Logistics Co...

  9. 78 FR 6325 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-01-30

    .... Application Type: New NVO & OFF License. Naca Logistics (USA), Inc. dba Brennan International Transport, dba...). Application Type: New NVO & OFF License. Miami Freight & Logistics Services, Inc. (NVO & OFF), 3630 NW 76th... World Shipping, dba OWS, dba Ocean Express, dba Oceanexpress Vanguard Logistics Services, dba Vanguard...

  10. INTERNAL HAZARDS ANALYSIS FOR LICENSE APPLICATION

    Energy Technology Data Exchange (ETDEWEB)

    R.J. Garrett

    2005-02-17

    The purpose of this internal hazards analysis is to identify and document the internal hazards and potential initiating events associated with preclosure operations of the repository at Yucca Mountain. Internal hazards are those hazards presented by the operation of the facility and by its associated processes that can potentially lead to a radioactive release or cause a radiological hazard. In contrast to external hazards, internal hazards do not involve natural phenomena and external man-made hazards. This internal hazards analysis was performed in support of the preclosure safety analysis and the License Application for the Yucca Mountain Project. The methodology for this analysis provides a systematic means to identify internal hazards and potential initiating events that may result in a radiological hazard or radiological release during the repository preclosure period. These hazards are documented in tables of potential internal hazards and potential initiating events (Section 6.6) for input to the repository event sequence categorization process. The results of this analysis will undergo further screening and analysis based on the criteria that apply to the performance of event sequence analyses for the repository preclosure period. The evolving design of the repository will be re-evaluated periodically to ensure that internal hazards that have not been previously evaluated are identified.

  11. NUCLEAR SAFETY DESIGN BASES FOR LICENSE APPLICATION

    International Nuclear Information System (INIS)

    Garrett, R.J.

    2005-01-01

    The purpose of this report is to identify and document the nuclear safety design requirements that are specific to structures, systems, and components (SSCs) of the repository that are important to safety (ITS) during the preclosure period and to support the preclosure safety analysis and the license application for the high-level radioactive waste (HLW) repository at Yucca Mountain, Nevada. The scope of this report includes the assignment of nuclear safety design requirements to SSCs that are ITS and does not include the assignment of design requirements to SSCs or natural or engineered barriers that are important to waste isolation (ITWI). These requirements are used as input for the design of the SSCs that are ITS such that the preclosure performance objectives of 10 CFR 63.111 [DIRS 156605] are met. The natural or engineered barriers that are important to meeting the postclosure performance objectives of 10 CFR 63.113 [DIRS 156605] are identified as ITWI. Although a structure, system, or component (SSC) that is ITS may also be ITWI, this report is only concerned with providing the nuclear safety requirements for SSCs that are ITS to prevent or mitigate event sequences during the repository preclosure period

  12. Nuclear Safety Design Base for License Application

    International Nuclear Information System (INIS)

    R.J. Garrett

    2005-01-01

    The purpose of this report is to identify and document the nuclear safety design requirements that are specific to structures, systems, and components (SSCs) of the repository that are important to safety (ITS) during the preclosure period and to support the preclosure safety analysis and the license application for the high-level radioactive waste (HLW) repository at Yucca Mountain, Nevada. The scope of this report includes the assignment of nuclear safety design requirements to SSCs that are ITS and does not include the assignment of design requirements to SSCs or natural or engineered barriers that are important to waste isolation (ITWI). These requirements are used as input for the design of the SSCs that are ITS such that the preclosure performance objectives of 10 CFR 63.111(b) [DIRS 173273] are met. The natural or engineered barriers that are important to meeting the postclosure performance objectives of 10 CFR 63.113(b) and (c) [DIRS 173273] are identified as ITWI. Although a structure, system, or component (SSC) that is ITS may also be ITWI, this report is only concerned with providing the nuclear safety requirements for SSCs that are ITS to prevent or mitigate event sequences during the repository preclosure period

  13. INTERNAL HAZARDS ANALYSIS FOR LICENSE APPLICATION

    International Nuclear Information System (INIS)

    Garrett, R.J.

    2005-01-01

    The purpose of this internal hazards analysis is to identify and document the internal hazards and potential initiating events associated with preclosure operations of the repository at Yucca Mountain. Internal hazards are those hazards presented by the operation of the facility and by its associated processes that can potentially lead to a radioactive release or cause a radiological hazard. In contrast to external hazards, internal hazards do not involve natural phenomena and external man-made hazards. This internal hazards analysis was performed in support of the preclosure safety analysis and the License Application for the Yucca Mountain Project. The methodology for this analysis provides a systematic means to identify internal hazards and potential initiating events that may result in a radiological hazard or radiological release during the repository preclosure period. These hazards are documented in tables of potential internal hazards and potential initiating events (Section 6.6) for input to the repository event sequence categorization process. The results of this analysis will undergo further screening and analysis based on the criteria that apply to the performance of event sequence analyses for the repository preclosure period. The evolving design of the repository will be re-evaluated periodically to ensure that internal hazards that have not been previously evaluated are identified

  14. PROCESS FOR LICENSE APPLICATION DEVELOPMENT FOR THE GEOLOGIC REPOSITORY

    International Nuclear Information System (INIS)

    DOUGLAS M. FRANKS AND NORMAN C. HENDERSON

    1997-01-01

    The Department of Energy (DOE), specifically the Office of Civilian Radioactive Waste Management (OCRWM) has been charged by the U.S. Congress, through the Nuclear Waste Policy Act (NWPA), with the responsibility for obtaining a license to develop a geologic repository. The NRC is the licensing authority for geologic disposal, and its regulations pertinent to construction authorization and license application are specified in 10 CFR Part 60, Disposal of High-Level Radioactive Wastes in Geologic Repositories, (section)60.21ff and (section)60.31ff. This paper discusses the process the Yucca Mountain Site Site Characterization Project (YMP) will use to identify and apply regulatory and industry guidance to development of the license application (LA) for a geologic repository at Yucca Mountain, Nevada. This guidance will be implemented by the ''Technical Guidance Document for Preparation of the License Application'' (TGD), currently in development

  15. Process for license application development for the geologic repository

    International Nuclear Information System (INIS)

    Franks, D.M.; Henderson, N.C.

    1998-01-01

    The Department of Energy (DOE), specifically the Office of Civilian Radioactive Waste Management (OCRWM) has been charged by the US Congress, through the Nuclear Waste Policy Act (NWPA), with the responsibility for obtaining a license to develop a geologic repository. The NRC is the licensing authority for geologic disposal, and its regulations pertinent to construction authorization and license application are specified in 10 CFR Part 60, Disposal of High-Level Radioactive Wastes in Geologic Repositories, section 60.21ff and section 60.31ff. This paper discusses the process the Yucca Mountain Site Characterization Project (YMP) will use to identify and apply regulatory and industry guidance to development of the license application (LA) for a geologic repository at Yucca Mountain, Nevada. This guidance will be implemented by the Technical Guidance Document for Preparation of the License Application (TGD), currently in development

  16. 75 FR 48686 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-08-11

    ...: New NVO License. Maritime and Intermodal Logistics Systems, Inc. dba MILS dba Fesco Integrated..., Senior Vice President/General Manager (Qualifying Individual), Kenryo Senda, President/CEO, Application...: New NVO & OFF License. Rado International, Inc. dba Rado Logistics (NVO & OFF), 2251 Sylvan Road...

  17. 77 FR 18815 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-03-28

    ... NVO License. American Patriot Lines, Inc. dba Tier One Logistics (NVO), 8616 La Tijera Boulevard, 401..., AL 36608. Officer: Samford T. Myers, Manager (Qualifying Individual). Application Type: New NVO & OFF License. Bluesea Logistics Corporation (NVO), 327 Elizabeth Avenue, Apt. A, Monterey Park, CA 91755-2044...

  18. 15 CFR 748.9 - Support documents for license applications.

    Science.gov (United States)

    2010-01-01

    ... licensing action, since end-uses and other considerations are important factors in the decision making... promptly notifying BIS of any change in the facts contained in the support document that comes to your attention. (h) Effect on license application review. BIS reserves the right in all respects to determine to...

  19. 77 FR 43599 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-07-25

    ... OFF License. Logistics International Parcel Shipping Transport LLC (NVO), 182 West Melrose Avenue, 2... Schwartz, Director, Application Type: New OFF License. Brox Logistics USA, LLC (NVO,) 244 5th Avenue, V-280... Agency Corporation, dba C&F Worldwide Logistics. Cargois Inc. dba Star Vision Logis (NVO), 2700 Coyle...

  20. 76 FR 28778 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-05-18

    ... Individual), Application Type: New NVO & OFF License. Asian Link Logistics, LLC dba Best Global (NVO & OFF... Type: New NVO License. Hansa Meyer Global Transport USA, LLC dba Hansa Shipping LLC, (OFF), 712 Main... & Logistics (Private) Limited dba, Nashrah Shipping and Logistics (NVO), Mezzanine Floor, Trade Ave., Tower 1...

  1. Human and Organisational Factors in the Licensing Process for New NPPs: The Swiss Approach

    International Nuclear Information System (INIS)

    Ryser, Cornelia

    2011-01-01

    Past and recent construction as well as operating experience has shown the importance of giving due attention to human and organisational factors (HOF) in the design and construction of new NPPs. The present paper primarily deals with the development of regulatory requirements by the Swiss Federal Nuclear Safety Inspectorate (ENSI) concerning HOF engineering aspects, i.e. the design of the work systems of the new NPP (technical systems, work tasks, operating organisation). The requirements concerning quality and project management or the management system in general are not in the main focus of this paper. The approach and requirements presented are not yet fully implemented in the Swiss regulatory framework and are still being worked on. Therefore the issues described in the paper have to be considered as provisional and might still be subject to some change in the next months as the approach and requirements are being further developed and finalised. (author)

  2. Fort Calhoun Station, Unit 2. License application, PSAR, general information

    International Nuclear Information System (INIS)

    1975-09-01

    Application for construction and operating licenses for Calhoun-2 Reactor is presented. Financial data concerning the Omaha Public Power District and the Nebraska Public Power District are included. (DCC)

  3. 76 FR 47182 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-08-04

    ... Street, Tampa, FL 33619, Officers: Margara L. Barillas, President (Qualifying Individual), Danihel I. Barillas, Secretary, Application Type: New NVO License. Russell A. Farrow (U.S.) Inc. (OFF & NVO), 4950...

  4. 77 FR 72863 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-12-06

    ... & D Transport, Inc. (NVO & OFF), 4869 Peavey Drive, Meridian, MS 39301. Officers: Uros Pejanovic, Vice... Nucete, Director. Application Type: New NVO & OFF License. Embarque Los Hidalgos LLC (NVO & OFF), 326...

  5. 77 FR 12583 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-03-01

    ... Hermo, Vice President, Application Type: New NVO & OFF License. B2B Global Logistics Incorporated (NVO... Change. Global Logistics New Jersey Limited Liability Company (NVO & OFF) 275 Veterans Boulevard...

  6. 77 FR 64991 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-10-24

    ..., Manager/Member. Application Type: New NVO & OFF License. Hospitality Logistics International LLC (NVO...), 11690 NW. 105th Street, Law 4W, Miami, FL 33178. Officers: Chris Merritt, Vice President (QI), John H...

  7. 77 FR 26008 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-05-02

    .... Forth-Matthews, President, Application Type: New OFF License. Azimuth Lines Inc. (OFF), 111 Ivy Lane.... (NVO), 1000 Lakes Drive, 260, West Covina, CA 91760, Officers: Larry Lee, Treasurer (Qualifying...

  8. 75 FR 67973 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-11-04

    ... Individual), Joy V. Pareckattil, President/Director, Application Type: New NVO License. CJC Logistics Limited Liability Company dba CJC Container Line (NVO & OFF), 186 Alps Road, Wayne, NJ 07470. Officers: Oliver Rosca...

  9. 76 FR 78007 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-12-15

    ..., (Qualifying Individual), Ruba Hindi, Member, Application Type: New OFF License. Kemka USA Limited Liability Company (NVO & OFF), 421 Lucy Court, South Plainfield, NJ 07080, Officer: Hsiang (Rita) Y. Hsiao, Member...

  10. 77 FR 70162 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-11-23

    ...), 900 Center Park Drive, Suite F, Charlotte, NC 28217, Officers: Paul L. Carter, Vice President (QI...), Application Type: New NVO License. Transport Partner (USA), Inc. (NVO & OFF), 2006 Cherry Hill Lane...

  11. 78 FR 38336 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-06-26

    ..., President (QI), Stephen B. Schwark, Treasurer, Application Type: License Transfer to EFL Container Lines...., Suite K, Mobile, AL 36609, Officers: Thomas (Mac) H. McPhillips IV, Assistant Vice President (QI), Oscar...

  12. 76 FR 23598 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-04-27

    ... Angeles, CA 90045, Officers: Ann L. Shang, CFO (Qualifying Individual), Yon L. Li, President, Application... Type: New NVO & OFF License. PME Logistics, Inc. (NVO), 19401 S. Main Street, Suite 102, Gardena, CA...

  13. 76 FR 56759 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-09-14

    ...), Ariel S. Villamayor, Limited Partner, Application Type: New OFF License. UTi, United States, Inc. dba UTi (NVO & OFF), 1660 Walt Whitman Road, Melville, NY 11747. Officers: Charles N. Deller, Vice...

  14. License application approach for the California LLRW disposal facility

    International Nuclear Information System (INIS)

    Gaynor, R.K.; Romano, S.A.; Hanrahan, T.P.

    1990-01-01

    US Ecology, Inc. is the State of California's license designee to site, develop and operate a low-level radioactive waste (LLRW) disposal facility to serve member states of the Southwestern Compact. US Ecology identified a proposed site in the Ward Valley of southeastern California in March 1988. Following proposed site selection, US Ecology undertook studies required to prepare a license application. US Ecology's license application for this desert site was deemed complete for detailed regulatory review by the California Department of Health Services (DHS) in December 1989. By mutual agreement, disposal of mixed waste is not proposed pending the State of California's decision on appropriate management of this small LLRW subset

  15. 10 CFR 781.62 - Contents of a license application.

    Science.gov (United States)

    2010-01-01

    ... royalty fees or other consideration, if any, that the applicant would be willing to pay the Government for... application. An application for a license under a DOE invention must be accompanied by a processing fee of $25... towards royalty if royalties are charged, and must include the following information: (a) Identification...

  16. 78 FR 17205 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-03-20

    .... Sicilia, Member, Application Type: New NVO & OFF License. Brookfield Relocation Inc. (OFF), Two Corporate... Schwartz, President, Application Type: QI Change. Covenant Global Logistics Inc (NVO & OFF), 440 Benmar..., President, Application Type: Add Trade Name CGL Shipping. EXL Logistics, Inc. (NVO), 1444 NW 82nd Avenue...

  17. 78 FR 75345 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-12-11

    .... Romero, President (QI). Application Type: New NVO & OFF License. F.H.L. Logistics, Inc. (NVO & OFF), 1354.... Officers: Arif H. Butt, General Manager (QI), Unni Krishnan Nair, President. Application Type: New NVO...: Stephen F. Crooks, Vice President (QI), Scott Kelly, President. Application Type: Adding NVO Service...

  18. 76 FR 22104 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-04-20

    ...), Application Type: Business Structure Change Foothills Logistics, Inc. (NVO), 2045 John Crosland Jr. Way... Individual), Daniel Gelpi, President, Application Type: Add NVO Service ADM Logistics, Inc. (NVO & OFF), 4666... (Qualifying Individual), Application Type: New NVO & OFF License ATC Logistics, Inc. (NVO & OFF), 14350...

  19. 78 FR 50054 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-08-16

    ...), Ross V. Stemmler, President, Application Type: QI Change. Dawson Logistics, Inc. (OFF), 2220 South... (QI), Chad Earwood, President, Application Type: Add NVO Service. Fesco Integrated Transport North...), Ugochukwu O. Ene, President, Application Type: New NVO & OFF License. Icon Logistics Services LLC (OFF...

  20. 78 FR 55698 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-09-11

    ...), Karla Costilla, Member/Manager, Application Type: New NVO & OFF License. ICAT Logistics, Inc. (OFF..., Washington, DC 20573, by telephone at (202) 523-5843 or by email at [email protected] . Abaco Logistics Corporation..., CFO, Application Type: QI Change & Add OFF Service. American General Logistics, Inc. (NVO), 626 N...

  1. 77 FR 37044 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-06-20

    ... 95695, Officer: Nasrullah Chaudhry, Member/Manager (Qualifying Individual), Application Type: Add NVO... (Qualifying Individual), Margaret Kong, CFO/Secretary, Application Type: New NVO & OFF License. FSG Logistics (USA), Inc. dba FSG Logistics, Inc. (NVO & OFF), 27013 Pacific Highway South, PMB386, Des Moines, WA...

  2. 78 FR 48435 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-08-08

    ... Change. Ever Line Logistics Inc. (NVO & OFF), 147-35 Farmers Blvd., Suite 208, Jamaica, NY 11434, Officer: Caihong Yang, President (QI), Application Type: Name Change to Bona Logistics US Inc. Global Container.... Bote, Member/Manager, Edgar T. Bote, Member/Manager, Application Type: New NVO License. National Air...

  3. 76 FR 55909 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-09-09

    ..., LLC dba AIM Global Logistics (NVO & OFF), 6402 Teluco Street, Houston, TX 77055, Officer: Angelica Garcia-Dunn, Manager/President/Treasurer (Qualifying Individual), Application Type: New OFF & NVO License... Individual), Application Type: Name Change. BestOcean Worldwide Logistics, Inc. (NVO & OFF), 1300 Valley...

  4. 78 FR 18592 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-03-27

    ...), Veronica Alcestte, Manager, Application Type: New NVO & OFF License Worldcraft Logistics LLC (NVO & OFF.... Salvat, Vice President, Application Type: Add NVO Service Bayshore Logistics & Services, LLC (NVO & OFF), 909 Westfield Avenue, Elizabeth, NJ 07208, Officers: Raquel Velez, Operating Manager (QI), Jose Moreno...

  5. 76 FR 62407 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-10-07

    ... & Product Logistics Manager (Qualifying Individual), Thomas B. Crowley, Director, Application Type: QI... at (202) 523-5843 or by e-mail at [email protected] . Alltransport International Logistics, Inc. (NVO), 63... Individual), Application Type: New NVO License. American Global Logistics LLC dba AGL (NVO & OFF), 3399...

  6. 78 FR 14792 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-03-07

    ...: Mohamed Y. Ali, Manager (QI); Abdul S. Mohamed, Member. Application Type: Add Trade Name Compass Logistics... Ugueto, Secretary. Application Type: New NVO & OFF License American Forwarding & Logistics, LLC (NVO & OFF), 1919 NW 19th Street, Unit 624, Ft. Lauderdale, FL 33311. Officers: Gabriele Awada, Manager (QI...

  7. 77 FR 45610 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-08-01

    ...), Richard A. Arkey, Vice President, Application Type: New NVO License. Aequus Worldwide Logistics Inc. (NVO..., Application Type: Name Change to Concepts in Freight, Inc. FGN Global Logistics, Inc. (NVO & OFF), 4770...), 341 Erickson Avenue, P.O. Box 124, Essington, PA 19029, Officers: Ari M. Bobrow, Export Manager...

  8. 10 CFR 81.40 - Contents of a license application.

    Science.gov (United States)

    2010-01-01

    ... categories: (i) Small business firm; (ii) Minority business enterprise; (iii) Location in a surplus labor... correspondence should be sent and any notices served; (4) Nature and type of applicant's business; (5...; (6) Purpose for which the license is desired, and a brief description of applicant's plan to achieve...

  9. 77 FR 40882 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-07-11

    ..., Director, Application Type: License Transfer & QI Change. Gulf Premier Logistics LLC (NVO & OFF), 340 N... & OFF), 1163 Fairway Drive, 106, City of Industry, CA 91789, Officer: XiuJi Zhang, President, (Qualifying Individual), Application Type: Add NVO Service. Simple Logistics Inc. (NVO), 147-35 Farmers...

  10. 77 FR 38288 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-06-27

    ..., President. Application Type: QI Change. Freight Logistics Services USA Forwarding Ltd (OFF), 15955 W. Hardy... Individual). Application Type: Add OFF Service. Pudong Prime Int'l Logistics, Inc. (NVO), 9660 Flair Drive... License. Benchmark Worldwide Logistics, Inc. dba Star Ocean Lines (NVO & OFF), 24900 South Route 53...

  11. 78 FR 48870 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-08-12

    ...: Tufan Duygun, Manager (QI), Ozisik Serhat, Member, Application Type: Add Trade Name Daimon Logistics USA. Logistics International Parcel Shipping Transport LLC (NVO), 391 Kent Avenue, Elk Grove, IL 60007, Officers...), Application Type: NVO & OFF License. Kesco Logistics, Inc. (NVO & OFF), 20 E. Sunrise Highway, Suite 308...

  12. 75 FR 57798 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-09-22

    ..., (Qualifying Individual). Application Type: New NVO & OFF License. Cambria Global Logistics, LLC (OFF), 12140...). Application Type: QI Change. K&K Express, LLC dba K2 Logistics (NVO & OFF), 2980 Commers Drive, 100, Eagan, MN... Global Transport (NVO), 8636 York Circle, La Palma, CA 90623. Officer: Smile Cha, Sole Proprietor...

  13. 76 FR 67730 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-11-02

    ..., President, Application Type: Name Change/Trade Name Change Lion Transport, Inc. dba Amex Logistics (NVO... Individual), Caetano R. Lopes, Vice President, Application Type: Add NVO Service Eztrans Logistics Ltd. (NVO... Type: New OFF License LF Freight USA LLC dba LF Logistics dba LF Freight dba IDS Logistics USA, dba IDS...

  14. 77 FR 30530 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-05-23

    ... Individual), Application Type: New NVO License. Global Wine Logistics, Inc. (NVO & OFF), 197 Route 19 South... Hextall, President/CEO, Application Type: Add NVO Service/Trade Name Change. M & D Global Logistics, Inc... Service. Metro Freight Services, Inc. dba Maritime Express Lines (M.E.L.) (NVO & OFF), 1225 W. St. George...

  15. Self-management of self-organising mobile computing applications : a separation of concerns approach

    OpenAIRE

    Fernandez Marquez, Jose Luis; di Marzo Serugendo, Giovanna; Stevenson, Graeme Turnbull; Ye, Juan; Dobson, Simon Andrew; Zamonelli, Franco

    2014-01-01

    Although the research area of self-organising systems is well established, their construction is often ad hoc. Consequently, such software is difficult reuse across applications that require similar functionality of have similar goals. The development of self-organising applications and, a fortiori, self-organising mobile applications is therefore limited to developers who are experts in specific self-organising mechanisms. As a first step towards addressing this, this paper discusses the not...

  16. 47 CFR 80.53 - Application for a portable ship station license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Application for a portable ship station license... SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Applications and Licenses § 80.53 Application for a portable ship station license. The Commission may grant a license permitting operation of a...

  17. Licensing of safety critical software for nuclear reactors. Common position of seven European nuclear regulators and authorised technical support organisations

    Energy Technology Data Exchange (ETDEWEB)

    2010-07-01

    It is widely accepted that the assessment of software cannot be limited to verification and testing of the end product, i.e. the computer code. Other factors such as the quality of the processes and methods for specifying, designing and coding have an important impact on the implementation. Existing standards provide limited guidance on the regulatory and safety assessment of these factors. An undesirable consequence of this situation is that the licensing approaches taken by nuclear safety authorities and by technical support organisations are determined independently with only limited informal technical co-ordination and information exchange. It is notable that several software implementations of nuclear safety systems have been marred by costly delays caused by difficulties in co-ordinating the development and qualification process. It was thus felt necessary to compare the respective licensing approaches, to identify where a consensus already exists, and to see how greater consistency and more mutual acceptance could be introduced into current practices. This report is the result of the work of a group of regulator and safety authorities' experts. The 2007 version was completed at the invitation of the Western European Nuclear Regulators' Association (WENRA). The major result of the work is the identification of consensus and common technical positions on a set of important licensing issues raised by the design and operation of computer based systems used in nuclear power plants for the implementation of safety functions. The purpose is to introduce greater consistency and more mutual acceptance into current practices. To achieve these common positions, detailed consideration was paid to the licensing approaches followed in the different countries represented by the experts of the task force. The report is intended to be useful: - to coordinate regulators' and safety experts' technical viewpoints in the design of regulators' national

  18. Licensing of safety critical software for nuclear reactors. Common position of seven European nuclear regulators and authorised technical support organisations

    International Nuclear Information System (INIS)

    2010-01-01

    It is widely accepted that the assessment of software cannot be limited to verification and testing of the end product, i.e. the computer code. Other factors such as the quality of the processes and methods for specifying, designing and coding have an important impact on the implementation. Existing standards provide limited guidance on the regulatory and safety assessment of these factors. An undesirable consequence of this situation is that the licensing approaches taken by nuclear safety authorities and by technical support organisations are determined independently with only limited informal technical co-ordination and information exchange. It is notable that several software implementations of nuclear safety systems have been marred by costly delays caused by difficulties in co-ordinating the development and qualification process. It was thus felt necessary to compare the respective licensing approaches, to identify where a consensus already exists, and to see how greater consistency and more mutual acceptance could be introduced into current practices. This report is the result of the work of a group of regulator and safety authorities' experts. The 2007 version was completed at the invitation of the Western European Nuclear Regulators' Association (WENRA). The major result of the work is the identification of consensus and common technical positions on a set of important licensing issues raised by the design and operation of computer based systems used in nuclear power plants for the implementation of safety functions. The purpose is to introduce greater consistency and more mutual acceptance into current practices. To achieve these common positions, detailed consideration was paid to the licensing approaches followed in the different countries represented by the experts of the task force. The report is intended to be useful: - to coordinate regulators' and safety experts' technical viewpoints in the design of regulators' national policies and in revisions

  19. 76 FR 6135 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-02-03

    ... Lawin Cargo dba, Bahaghari Express Cargo (NVO), 761 Highland Place, San Dimas, CA 91773, Officer..., Application Type: New NVO License. Four Points Ocean Inc. (NVO & OFF), 1460 Route 9 North, Suite 303.... Grannell, President/CEO (Qualifying Individual), Michael Kuhn, Vice President, Sales & Marketing...

  20. Fuel Receiving and Storage Station. License application, amendment 4

    International Nuclear Information System (INIS)

    1975-04-01

    Amendment No. 4 of the application for licensing the Barnwell Fuel Processing Plant is presented. Information is included on: the quantity and characteristics of nuclear fuel assemblies which can be received and stored; specifications limiting the outside washdown of contaminated casks received for unloading; and definition of environmental monitoring program. (U.S.)

  1. 78 FR 35634 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-06-13

    ..., Washington, DC 20573, by telephone at (202) 523-5843 or by email at [email protected] . China Interocean Transport.... Taleon, Sole Proprietor (QI). Application Type: New NVO & OFF License. Dulce Auto Import & Export, Inc...), Parque de Granada No. 71, P.H. 504, Huixquilucan, Estado de Mexico 52785 Mexico. Officers: Moises S. Leon...

  2. 76 FR 3636 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-01-20

    ..., Vice President, Application Type: New NVO & OFF License. CDS Global Logistics, Inc. (NVO & OFF), 1001... & Logistics LLC (NVO & OFF), Hoboken Business Center, 50 Harrison Street, Suite 204B, Hoboken, NJ 07030, Officers: Michelle L. Hasenauer, Manager (Qualifying Individual), Harbans S. Shrinkant, Manager...

  3. 77 FR 65887 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-10-31

    ..., Washington, DC 20573, by telephone at (202) 523-5843 or by email at [email protected] . ACM Logistics & Consulting... Type: New OFF License; Highland Project Logistics, Inc. (NVO & OFF), 35 Constitution Drive, Suite A.... Bonner, Special Manager (QI), Martine L. Plunkett, Manager, Application Type: Additional QI; Radiant...

  4. 76 FR 41258 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-07-13

    ... Individual), Gediminas Garmus, Member/Manager. Application Type: New OFF License. World Logistics USA, Inc... at (202) 523-5843 or by e-mail at [email protected] . 3 Plus Logistics Co. dba Touchdown Freight Co. (NVO... Logistics, Inc. (NVO), 3120 Via Mondo, Rancho Dominguez, CA 90220. Officer: Simon Hwang, President/CEO...

  5. 75 FR 35815 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-06-23

    ..., TX 76011. Officers: Omar Kolaghassi, Manager (Qualifying Individual), Laura Alicia, Manager. Application Type: New OFF & NVO License. CALS Logistics USA, Inc. (OFF & NVO), 755 North Route 83, Suite 215.... Premium Star Logistics LLC dba O.P. Premium Star Logistics (OFF & NVO), 4200 Lightning Court, Bakersfield...

  6. 77 FR 74186 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-12-13

    ... Logistics, Inc. (NVO & OFF), 7685 NW. 80th Terrace, Medley, FL 33166, Officers: Hugo E. Martinez, Secretary... & OFF), 1834 Harden Blvd., Lakeland, FL 33803, Officers: Steven C. Pniewski, Manager (QI), Manuel R. Echevarria, President, Application Type: New NVO & OFF License, Global Wide Logistics, Inc. (NVO), 1937 Davis...

  7. 78 FR 43202 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-07-19

    .... Alsea Global Logistics, LLC dba Alsea Global Logistics (NVO & OFF), 4836 SE Powell Blvd., Portland, OR... NVO & OFF License. Atlant Consulting Inc. dba Avro Logistics (NVO & OFF), 3626 Geary Blvd., Suite 206..., Officers: Paul Selvage, Member (QI), Steven Periman, Member/Manager, Application Type: Add Trade Name Blu...

  8. 76 FR 14395 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-03-16

    ..., Manager/President. Application Type: QI Change. Geoffrey Au dba ABC Logistics Company (NVO), 2250 Gellert... at (202) 523-5843 or by e-mail at [email protected] . Arkman Logistics Inc. (NVO), 1001 Fargo Avenue, Elk... Type: New NVO & OFF License. BCargo Logistics, S.A. de C.V. (NVO), Av. Revolucion 725-A, Col. Jardin...

  9. 75 FR 29545 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-05-26

    .... Atlantic Cargo Logistics LLC (OFF & NVO), 120 South Woodland Blvd., 216, Deland, FL 32720. Officers: Dietmar Lutte, Manager, (Qualifying Individual) Susan Lutte, Member, Application Type: New OFF & NVO License. Direct Delivery Logistics and Supply, LLC (OFF & NVO) 2006 Wilson Road, Humble, TX 77396...

  10. 77 FR 35384 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-06-13

    ... Logistics LLC (NVO), 9814 Goldenglade Drive, Houston, TX 77064, Officer: Sandra Lesage, Member/Manager... telephone at (202) 523-5843 or by email at [email protected] . ABC Trucking and Logistics L.L.C. (OFF), 3080...), Lawrence R. Lammers, President/CEO, Application Type: License Transfer Atlantic Cargo Logistics LLC (NVO...

  11. 9 CFR 2.11 - Denial of initial license application.

    Science.gov (United States)

    2010-01-01

    ... have violated any Federal, State, or local laws or regulations pertaining to animal cruelty within 1... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Denial of initial license application. 2.11 Section 2.11 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT...

  12. 76 FR 7209 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-02-09

    ... 77032. Officer: Walter Krauklis, OTI Compliance Officer (Qualifying Individual), Thomas B. Crowley, Jr... Road, Suite 14, Newtown Square, PA 19073. Officer: Thomas D. Torcomian, CEO/ Member (Qualifying...). Application Type: New OFF License. Solomon Emeke dba Desaiah Limited (OFF), 3696 Park Avenue, 300, Ellicott...

  13. 76 FR 38651 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-07-01

    ... Shipping (NVO), 1861 Western Way, Torrance, CA 90501. Officers: Hseanrus (Stephen) H. Lin, President/Vice..., President, Application Type: New NVO & OFF License. F.H.L. Logistics, Inc. (NVO & OFF), 1354 NW 78th Avenue..., Gardena, CA 90248. Officers: Anna W. Liu, Vice President (Operations), (Qualifying Individual), Quincy H...

  14. 76 FR 33757 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-06-09

    ... NVO & OFF License. The Ultimate Logistics Service Corporation (NVO & OFF), 3 Birch Place, Pine Brook... Logistics, Corp. (NVO), 4713 Deeboyar, Lakewood, CA 90712. Officer: Tan Sek, Pres/VP/Sec/Treasurer...), Application Type: Add OFF Service. Oceanic Link USA LLC (NVO & OFF), 5430 Jimmy Carter Blvd., Suite 216...

  15. 77 FR 13604 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-03-07

    ... A. Rincon, Manager (Qualifying Individuals), Application Type: Business Structure Change. De Well... Type: New NVO License. King Solomon Logistics Inc. (NVO), 135-14 Liberty Avenue, South [[Page 13605... Logistics Inc. (NVO), 167-16 146th Avenue, Suite 203, Jamaica, NY 11434, Officer: Yau Fung Ling, President...

  16. 78 FR 60282 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-10-01

    ...) pursuant to section 19 of the Shipping Act of 1984 (46 U.S.C. 40101). Notice is also given of the filing of... Castleton Street, Suite 105, City of Industry, CA 91748, Officers: Ya Liu, Deputy General Manager (QI), Jian C. Feng, Director, Application Type: New NVO License, By the Commission. Dated: September 27, 2013...

  17. 77 FR 39707 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-07-05

    ..., Application Type: New OFF License. Best Global Logistics USA, Inc dba Siam Intercargo Services (NVO & OFF... International Transport, LLC (NVO), 6048 Lido Lane, Long Beach, CA 90803, Officer: Charles Brennan, Member...: Add NVO Service. Sinai Logistics LLC (NVO & OFF), 11419 NW. 112th Street, Medley, FL 33178, Officer...

  18. 76 FR 16420 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-03-23

    ...), Andrew P. Bottomley, Managing Partner, Application Type: QI Change and Add OFF Service. All Transport... Type: New NVO & OFF License. Andrea Bigi dba AB Global Logistics Consulting (OFF), 1010 19th Street, 10.... Officers: Joanne Kirkpatrick, International Logistics Officer (Qualifying Individual), Jack R. Lentz, CEO...

  19. 76 FR 65193 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-10-20

    ... at (202) 523-5843 or by e-mail at [email protected] . AB Global Logistics Consulting Inc. (OFF), 1010 19th..., Application Type: New NVO License. All Transport Export Inc (NVO & OFF), 4224 Shackleford Road, 3, Norcross... Type: Name Change. CR & J Logistics, Inc. (OFF), 8401 Lake Worth Road, Lake Worth, FL 33467. Officers...

  20. Application of coupled codes for safety analysis and licensing issues

    International Nuclear Information System (INIS)

    Langenbuch, S.; Velkov, K.

    2006-01-01

    An overview is given on the development and the advantages of coupled codes which integrate 3D neutron kinetics into thermal-hydraulic system codes. The work performed within GRS by coupling the thermal-hydraulic system code ATHLET and the 3D neutronics code QUABOX/CUBBOX is described as an example. The application of the coupled codes as best-estimate simulation tools for safety analysis is discussed. Some examples from German licensing practices are given which demonstrate how the improved analytical methods of coupled codes have contributed to solve licensing issues related to optimized and more economical use of fuel. (authors)

  1. Licensed reactor nuclear safety criteria applicable to DOE reactors

    International Nuclear Information System (INIS)

    1993-11-01

    This document is a compilation and source list of nuclear safety criteria that the Nuclear Regulatory Commission (NRC) applies to licensed reactors; it can be used by DOE and DOE contractors to identify NRC criteria to be evaluated for application to the DOE reactors under their cognizance. The criteria listed are those that are applied to the areas of nuclear safety addressed in the safety analysis report of a licensed reactor. They are derived from federal regulations, USNRC regulatory guides, Standard Review Plan (SRP) branch technical positions and appendices, and industry codes and standards

  2. Fuel Receiving and Storage Station. License application, amendment 7

    International Nuclear Information System (INIS)

    1976-02-01

    Amendment No. 7 to Allied-General Nuclear Services application for licensing of the Fuel Receiving and Storage Station consists of revised pages for: Amendment No. 7 to AG-L 105, ''Technical Description in Support of Application for FRSS Operation''; Amendment No. 1 to AG-L 105A, ''Early Operation of the Service Concentrator''; and Amendment No. 2 to AG-L 110, ''FRSS Summary Preoperational Report.''

  3. Licensing of safety critical software for nuclear reactors. Common position of seven European nuclear regulators and authorised technical support organisations

    International Nuclear Information System (INIS)

    2007-01-01

    The major result of the work is the identification of consensus and common technical positions on a set of important licensing issues raised by the design and operation of computer-based systems used in Nuclear Power Plants for safety functions. The purpose is to introduce greater consistency and more mutual acceptance into current practices. To achieve these common positions, detailed consideration was paid to the licensing approaches followed in the different countries represented by the experts of the task force. The report is intended to be useful: - to coordinate regulators' and safety experts' technical viewpoints in the design of regulators' national policies and in revisions of guidelines; - as a reference in safety cases and demonstrations of safety of software based systems; - as guidance for system design specifications by manufacturers and major I and C suppliers on the international market. The task force decided at an early stage to focus attention on computer based systems used in Nuclear Power Plants for the implementation of safety functions; namely, those systems classified by the IAEA as 'Safety Systems'. Therefore, recommendations of this report - except those of chapter 1.11 - primarily address 'safety systems' and not 'safety related systems'. It was felt that the most difficult aspects of the licensing of digital programmable systems are rooted in the specific properties of the technology. The objective was therefore to delineate practical and technical licensing guidance, rather than discussing or proposing basic principles or requirements. The design requirements and the basic principles of nuclear safety in force in each member state are assumed to remain applicable. This report represents the consensus view achieved by the experts who contributed to the task force. It is the result of what was at the time of its initiation a first attempt at the international level to achieve consensus among nuclear regulators on practical methods for

  4. 21 CFR 515.20 - Approval of medicated feed mill license applications.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Approval of medicated feed mill license... SERVICES (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Administrative Actions on Licenses § 515.20 Approval of medicated feed mill license applications. Within 90 days after an...

  5. 21 CFR 515.21 - Refusal to approve a medicated feed mill license application.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Refusal to approve a medicated feed mill license... SERVICES (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Administrative Actions on Licenses § 515.21 Refusal to approve a medicated feed mill license application. (a) The...

  6. 78 FR 37324 - Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications

    Science.gov (United States)

    2013-06-20

    ... Environmental Reports for Nuclear Power Plant License Renewal Applications AGENCY: Nuclear Regulatory Commission... for Nuclear Power Plant License Renewal Applications.'' This regulatory guide provides guidance to... renewal of a nuclear power plant operating license. Applicants should use this regulatory guide when...

  7. 47 CFR 87.47 - Application for a portable aircraft station license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Application for a portable aircraft station... SPECIAL RADIO SERVICES AVIATION SERVICES Applications and Licenses § 87.47 Application for a portable aircraft station license. A person may apply for a portable aircraft radio station license if the need...

  8. License renewal - an idea whose time has come. Hatch nuclear plant license renewal program: an actual example of application of the license renewal rule to the Intake Structure

    International Nuclear Information System (INIS)

    Chandiwala, F.; Evans, W.P.

    1999-01-01

    After the NRC issued a revised license renewal rule in May 1995, the nuclear industry focussed on developing generic industry for implementing the rule and testing the guidance through various demonstration programs and work products in conjunction with the NRC. In addition, plant-specific programs also proceeded forward. These activities show that implementation issues continue to exist. Since the issuance of the rule, the NRC has issued a draft standard review plan for license renewal (SRP-LR), working draft, September 1997. Southern Nuclear Operating Company (SNC) has begun development work on a license renewal application for Plant Hatch Units 1 and 2. Plant Hatch Units 1 and 2 are BWR 4, Mark I plants whose operating licenses expire in 2014 and 2018, respectively. The Plant Hatch initiative also involves teaming with other boiling water reactors (BWRs) to develop the license renewal technology within the BWR fleet, and to support Plant Hatch by providing an oversight role for the application process. The teaming effort involved two other utilities, each being assigned to prepare a common report on a mechanical system or a structure. The common report could be presented to the NRC with modifications to suit the individual plants, thereby saving time and money, and hopefully resulting in quicker approval by the NRC. The desired license renewal process end result is a renewed license with up to a 20 year extension (10CFR 54.31(b)). (orig.)

  9. Licensed reactor nuclear safety criteria applicable to DOE reactors

    International Nuclear Information System (INIS)

    1991-04-01

    The Department of Energy (DOE) Order DOE 5480.6, Safety of Department of Energy-Owned Nuclear Reactors, establishes reactor safety requirements to assure that reactors are sited, designed, constructed, modified, operated, maintained, and decommissioned in a manner that adequately protects health and safety and is in accordance with uniform standards, guides, and codes which are consistent with those applied to comparable licensed reactors. This document identifies nuclear safety criteria applied to NRC [Nuclear Regulatory Commission] licensed reactors. The titles of the chapters and sections of USNRC Regulatory Guide 1.70, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants, Rev. 3, are used as the format for compiling the NRC criteria applied to the various areas of nuclear safety addressed in a safety analysis report for a nuclear reactor. In each section the criteria are compiled in four groups: (1) Code of Federal Regulations, (2) US NRC Regulatory Guides, SRP Branch Technical Positions and Appendices, (3) Codes and Standards, and (4) Supplemental Information. The degree of application of these criteria to a DOE-owned reactor, consistent with their application to comparable licensed reactors, must be determined by the DOE and DOE contractor

  10. 76 FR 65544 - Standard Format and Content of License Applications for Mixed Oxide Fuel Fabrication Facilities

    Science.gov (United States)

    2011-10-21

    ... NUCLEAR REGULATORY COMMISSION [NRC-2009-0323] Standard Format and Content of License Applications... revision to regulatory guide (RG) 3.39, ``Standard Format and Content of License Applications for Mixed Oxide Fuel Fabrication Facilities.'' This guide endorses the standard format and content for license...

  11. 21 CFR 515.11 - Supplemental medicated feed mill license applications.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Supplemental medicated feed mill license... SERVICES (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Applications § 515.11 Supplemental medicated feed mill license applications. (a) After approval of a medicated feed...

  12. License Application Design Selection Feature Report: Aging and Blending

    International Nuclear Information System (INIS)

    Coltoni, B.; Anderson, M.J.

    1999-01-01

    The purpose of this document is to evaluate the concepts of Aging and Blending for waste sent to the Monitored Geologic Repository (MGR). These design features are based on pre-emplacement treatment of the waste stream. The envelope of the analysis has been performed under the direction of the License Application Design Selection Team (LADST), which advocated utilizing the Viability Assessment (VA) repository design (DOE 1998c) as the basis. Therefore, this evaluation attempts to modify the VA design only to the extent that Aging and Blending can be accomplished. This modified VA design will be contrasted to the VA Design and the difference in design, costs, and performance will be presented

  13. 21 CFR 515.25 - Revocation of order refusing to approve a medicated feed mill license application or suspending...

    Science.gov (United States)

    2010-04-01

    ... medicated feed mill license application or suspending or revoking a license. 515.25 Section 515.25 Food and..., FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Administrative Actions on Licenses § 515.25 Revocation of order refusing to approve a medicated feed mill license application or suspending or revoking a...

  14. How a regulator is preparing for reviewing a license application file: The case of ASN

    International Nuclear Information System (INIS)

    Tanguy, Loic

    2014-01-01

    The French Nuclear Safety Authority (ASN) is an independent administrative authority. It prepares regulation pertaining to the management of radioactive waste, monitors the control of safety of basic nuclear installations that produce or treat waste or are involved in their disposal and performs inspections of waste producers (EDF, AREVA, CEA, hospitals, research centres, etc.) and Andra, the French National Radioactive Waste Management Agency. It regulates the overall system set up by Andra for accepting waste from producers and assesses waste management policy and the practices of radioactive waste producers. It reviews license applications and authorises commissioning of nuclear installations. In order to review technical documents, ASN benefits from the expertise of technical support organisations. The French Institute for Radiation Protection and Nuclear Safety (IRSN) is the main such organisation. ASN has been making efforts to diversify its experts for several years. In preparing its decisions, ASN also calls on the opinions and recommendations of seven Advisory Committees of Experts (GPE), with expert knowledge in the areas of waste, nuclear pressure equipment, medical exposure, non-medical radiation protection, reactors, transport, and laboratories and nuclear plants. ASN consults the GPEs in preparing its main decisions. In particular, they review the preliminary, provisional and final safety analysis reports for each nuclear installation. They can also be consulted about changes in regulations or doctrine. (authors)

  15. 78 FR 21930 - Aquenergy Systems, Inc.; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2013-04-12

    ... Systems, Inc.; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License...: November 11, 2012. d. Submitted by: Aquenergy Systems, Inc., a fully owned subsidiaries of Enel Green Power...

  16. Application and licensing requirements of the Framatome ANP RLBLOCA methodology

    International Nuclear Information System (INIS)

    Martin, R.P.; Dunn, B.M.

    2004-01-01

    The Framatome ANP Realistic Large-Break LOCA methodology (FANP RLBLOCA) is an analysis approach approved by the US NRC for supporting the licensing basis of 3- and 4-loop Westinghouse PWRs and CE 2x4 PWRs. It was developed consistent with the NRC's Code Scaling, Applicability, and Uncertainty (CSAU) methodology for performing best-estimate large-break LOCAs. The CSAU methodology consists of three key elements with the second and third element addressing uncertainty identification and application. Unique to the CSAU methodology is the use of engineering judgment and the Process Identification and Ranking Table (PIRT) defined in the first element to lay the groundwork for achieving the ultimate goal of quantifying the total uncertainty in predicted measures of interest associated with the large-break LOCA. It is the PIRT that not only directs the methodology development, but also directs the methodology review. While the FANP RLBLOCA methodology was generically approved, a plant-specific application is customized in two ways addressing how the unique plant characterization 1) is translated to code input and 2) relates to the unique methodology licensing requirements. Related to the former, plants are required by 10 CFR 50.36 to define a technical specification limiting condition for operation based on the following criteria: 1. Installed instrumentation that is used in the control room to detect, and indicate, a significant abnormal degradation of the reactor coolant pressure boundary. 2. A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. 3. A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a

  17. Licensing process in Finland

    International Nuclear Information System (INIS)

    Tiippana, Petteri

    2011-01-01

    In accordance with the Nuclear Energy Act, the use of nuclear energy constitutes operations subject to license. The licensing process and conditions for granting a license is defined in the legislation. The licenses are applied from and granted by the Government. This paper discusses briefly the licensing process in Finland and also the roles and responsibilities of main stakeholders in licensing. Licensing of a nuclear power plant in Finland has three steps. The first step is the Decision in Principle (DiP). Goal of DiP is to decide whether using nuclear power is for the overall good for the Finnish society. The second step is Construction License (CL) and the goal of CL phase is to determine whether the design of the proposed plant is safe and that the participating organisations are capable of constructing the plant to meet safety goals. The third step is the Operating License (OL) and the goal of the OL phase is to determine whether the plant operates safely and licensee is capable to operate the plant safely. Main stakeholders in the licensing process in Finland are the utility (licensee) interested in using nuclear power in Finland, Ministry of Employment and the Economy (MEE), Government, Parliament, STUK, the municipality siting the plant and the general public. Government grants all licenses, and Parliament has to ratify Government's Decision in Principle. STUK has to assess the safety of the license applications in each step and give statement to the Ministry. Municipality has to agree to site the plant. Both STUK and the municipality have a veto right in the licensing process

  18. The configural approach to organisational commitment: An application in Ghana

    Directory of Open Access Journals (Sweden)

    Edward O. Akoto

    2014-12-01

    Research purpose: To test the theory on profiles of commitment in an African context (Ghana. Motivation for the study: Although the three-component model of organisational commitment has been extended to several regions of Africa, there is a paucity of research on profiles of commitment on the continent. Research approach, design and method: Cross-sectional data from two studies, with samples of 187 and 218, were analysed using k-means clusters. Multivariate analysis of variance (MANOVA was then used to test the differences amongst profiles in their association with contextual variables, such as pay satisfaction, job security, strike propensity and two demographic factors. Main findings: In the k-means cluster analysis, a six-cluster solution emerged in both studies;the profiles include the highly committed and the uncommitted groups, as well as the profiles based on normative commitment and continuance commitment. Overall, the MANOVA post hoc outcome shows that the highly committed group reports higher mean scores on the positive outcome variables (e.g. job security than the uncommitted group. Conversely, the uncommitted group scored relatively higher on the negative organisational outcome (propensity to strike. Other mean differences were found in the respective studies on pay satisfaction, collectivism and the demographic factors. Practical/managerial implications: Employing the configural approach to the study of commitment in this region should increase our understanding of the patterns of attachment and their influence on behaviour. Different patterns of attachment exist within the organisation that may be beneficial or detrimental to behaviour on the job. It is, therefore, important for managers to identify these patterns and target organisational policy and resources appropriately. Contribution/value-add: This study applies the concept of commitment profiles to an untested region: an African context. It, therefore, adds to the literature on the

  19. Total System Performance Assessment-License Application Methods and Approach

    Energy Technology Data Exchange (ETDEWEB)

    J. McNeish

    2002-09-13

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issue (KTI) agreements, the ''Yucca Mountain Review Plan'' (CNWRA 2002 [158449]), and 10 CFR Part 63. This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are utilized in this document.

  20. Total System Performance Assessment - License Application Methods and Approach

    International Nuclear Information System (INIS)

    McNeish, J.

    2003-01-01

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issues (KTIs) identified in agreements with the U.S. Nuclear Regulatory Commission, the ''Yucca Mountain Review Plan'' (YMRP), ''Final Report'' (NRC 2003 [163274]), and the NRC final rule 10 CFR Part 63 (NRC 2002 [156605]). This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are used in this document

  1. License Application Design Selection Report, REV 01. August 1999

    International Nuclear Information System (INIS)

    Hastings, C.R.

    1999-01-01

    In December 1998, the U.S. Department of Energy (DOE) published the ''Viability Assessment of a Repository at Yucca Mountain'' (DOE 1998b). The Viability Assessment described a preliminary design of a potential repository at Yucca Mountain, Nevada, for disposal of spent nuclear fuel and high-level radioactive waste, and assessed the probable behavior of that repository design in the Yucca Mountain geologic setting. The report concluded that 'Yucca Mountain remains a promising site for a geologic repository and that work should proceed to support a decision in 2001 on whether to recommend the site to the President for development as a repository'. It also concluded that 'uncertainties remain about key natural processes, the preliminary design, and how the site and design would interact'. Recognizing that the design that was evaluated will be refined before a license application could be submitted, the Viability Aassesment notes that 'DOE is evaluating several design options and alternatives that could reduce existing uncertainty and improve the performance of the repository system'. During the preparation of the Viability Assessment, DOE asked the contractor for the Civilian Radioactive Waste Management Program to study alternative design concepts for a potential geologic repository for high-level radioactive waste at Yucca Mountain. The License Application Design Selection (LADS) project was initiated to conduct that study. The goal of the project was to develop and evaluate a diverse range of conceptual repository designs that work well in concert with the Yucca Mountain site and to recommend an initial design concept for the possible Site Recommendation and License Apllication. This report presents the results of the LADS project. The design process consisted of two phases. In Phase I, a series of basic design concepts (design alternatives) and components (design features) were analyzed for their potential value as elements of a repository design. In Phase II

  2. Case-based approaches for knowledge application and organisational learning

    DEFF Research Database (Denmark)

    Wang, Chengbo; Johansen, John; Luxhøj, James T.

    2005-01-01

    In dealing with the strategic issues within a manufacturing system, it is necessary to facilitate formulating the composing elements of a set of strategic manufacturing practices and activity patterns that will support an enterprise to reinforce and increase its competitive advantage....... These practices and activity patterns are based on learning and applying the knowledge internal and external to an organisation. To ensure their smooth formulation process, there are two important techniques designed – an expert adaptation approach and an expert evaluation approach. These two approaches provide...

  3. Revalidation and quality assurance: the application of the MUSIQ framework in independent verification visits to healthcare organisations.

    Science.gov (United States)

    Griffin, Ann; McKeown, Alex; Viney, Rowena; Rich, Antonia; Welland, Trevor; Gafson, Irene; Woolf, Katherine

    2017-02-14

    We present a national evaluation of the impact of independent verification visits (IVVs) performed by National Health Service (NHS) England as part of quality assuring medical revalidation. Organisational visits are central to NHS quality assurance. They are costly, yet little empirical research evidence exists concerning their impact, and what does exist is conflicting. The focus was on healthcare providers in the NHS (in secondary care) and private sector across England, who were designated bodies (DBs). DBs are healthcare organisations that have a statutory responsibility, via the lead clinician, the responsible officer (RO), to implement medical revalidation. All ROs who had undergone an IVV in England in 2014 and 2015 were invited to participate. 46 ROs were interviewed. Ethnographic data were gathered at 18 observations of the IVVs and 20 IVV post visit reports underwent documentary analysis. Primary outcomes were the findings pertaining to the effectiveness of the IVV system in supporting the revalidation processes at the DBs. Secondary outcomes were methodological, relating to the Model for Understanding Success in Quality (MUSIQ) and how its application to the IVV reveals the relevance of contextual factors described in the model. The impact of the IVVs varied by DB according to three major themes: the personal context of the RO; the organisational context of the DB; and the visit and its impact. ROs were largely satisfied with visits which raised the status of appraisal within their organisations. Inadequate or untimely feedback was associated with dissatisfaction. Influencing teams whose prime responsibility is establishing processes and evaluating progress was crucial for internal quality improvement. Visits acted as a nudge, generating internal quality review, which was reinforced by visit teams with relevant expertise. Diverse team membership, knowledge transfer and timely feedback made visits more impactful. Published by the BMJ Publishing Group

  4. 77 FR 70837 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-11-27

    ... intervene shall be filed in accordance with the Commission's ``Rules of Practice for Domestic Licensing... request: The proposed change will delete Function 14, SG [Steam Generator] Water Level--Low, Coincident... capability to shut down the reactor when required on Low--Low Steam Generator water level. The ability to...

  5. 78 FR 16876 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2013-03-19

    ... intervene shall be filed in accordance with the Commission's ``Rules of Practice for Domestic Licensing... proposes to replace the VHS with an onsite diesel generator as the AAC power source providing this... power source (the VHS) with an additional onsite AAC power source (diesel generator). This equipment can...

  6. 77 FR 63343 - Biweekly Notice: Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-10-16

    ... in accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10... for an inoperable diesel generator (DG). A commensurate change is also proposed to extend the maximum... alternating current power source (i.e., a supplemental diesel generator) with the capability to power any E...

  7. 77 FR 73684 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-12-11

    ... in accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10... emergency diesel generator, and the stored lube oil inventory will also continue to require that a 7-day supply be available for each diesel generator. The changes are consistent with NRC-approved Technical...

  8. 77 FR 67679 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-11-13

    ... diesel generator surveillance requirements. Margin of safety is related to the ability of the fission... evaluated; or (3) involve a significant reduction in a margin of safety. The basis for this proposed... accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10 CFR Part 2...

  9. 78 FR 14126 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2013-03-04

    ... in accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10... of the document. The E-Filing system also distributes an email notice that provides access to the... Completion Time has no impact on the consequences of any design basis accident since the consequences of an...

  10. 76 FR 72984 - Revised Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2011-11-28

    ... NUCLEAR REGULATORY COMMISSION Revised Application for a License To Export High-Enriched Uranium The application for a license to export high-enriched Uranium has been revised as noted below. Notice... fabricate fuel France. Security Complex; October 18, Uranium (93.35%). uranium (174.0 elements in France...

  11. 76 FR 49462 - Newfound Hydroelectric Company, KTZ Hydro, LLC; Notice of Application for Transfer of License...

    Science.gov (United States)

    2011-08-10

    ... Hydroelectric Company, KTZ Hydro, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On July 25, 2011, Newfound Hydroelectric Company (transferor) and KTZ Hydro, LLC (transferee) filed an application for transfer of license for the Newfound Hydroelectric Project...

  12. 76 FR 59173 - Standard Format and Content of License Applications for Conventional Uranium Mills

    Science.gov (United States)

    2011-09-23

    ... NUCLEAR REGULATORY COMMISSION [NRC-2008-0302] Standard Format and Content of License Applications for Conventional Uranium Mills AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide..., ``Standard Format and Content of License Applications for Conventional Uranium Mills.'' DG- 3024 was a...

  13. 75 FR 70350 - Liberty Natural Gas LLC, Liberty Liquefied Natural Gas (LNG) Deepwater Port License Application

    Science.gov (United States)

    2010-11-17

    ... DEPARTMENT OF TRANSPORTATION Maritime Administration [USCG-2010-0993] Liberty Natural Gas LLC, Liberty Liquefied Natural Gas (LNG) Deepwater Port License Application AGENCY: Maritime Administration... announce they have received an application for the licensing of a natural gas deepwater port and the...

  14. SKB's safety case for a final repository license application

    International Nuclear Information System (INIS)

    Hedin, Allan; Andersson, Johan

    2014-01-01

    The safety assessment SR-Site is a main component in SKB's license application, submitted in March 2011, to construct and operate a final repository for spent nuclear fuel at Forsmark in the municipality of Oesthammar, Sweden. Its role in the application is to demonstrate long-term safety for a repository at Forsmark. The assessment relates to the KBS-3 disposal concept in which copper canisters with a cast iron insert containing spent nuclear fuel are surrounded by bentonite clay and deposited at approximately 500 m depth in saturated, granitic rock. The principal regulatory acceptance criterion, issued by the Swedish Radiation Safety Authority (SSM), requires that the annual risk of harmful effects after closure not exceed 10 -6 for a representative individual in the group exposed to the greatest risk. SSM's regulations also imply that the assessment time for a repository of this type is one million years after closure. The licence applied for is one in a stepwise series of permits, each requiring a safety report. The next step concerns a permit to start excavation of the repository and requires a preliminary safety assessment report (PSAR) covering both operational and post-closure safety. Later steps include permission to commence trial operation, to commence regular operation and to close the final repository. (authors)

  15. 75 FR 69080 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-11-10

    ... license as a Non-Vessel-Operating Common Carrier (NVO), and/or Ocean Freight Forwarder (OFF)--Ocean..., Building 14-A, Kenner, LA 70062, Officers: Gary J. Cheramie, President (Qualifying Individual), George...: License Transfer. Total Global Solutions, Inc. (NVO & OFF), 4290 Bells Ferry Road 224, Suite 106, Kennesaw...

  16. 78 FR 32650 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-05-31

    ... Change Abaco Logistics Corporation (OFF), 8051 NW 67th Street, Miami, FL 33166, Officers: Manuel T. Soto...: New NVO & OFF License Star Cluster Logistics (NVO & OFF), 4 Executive Circle, Suite 170, Irvine, CA... License Straight Forwarding, Inc. (NVO & OFF), 20974 Currier Road, City of Industry, CA 91789, Officer: Yi...

  17. Examining the application of Web 2.0 in medical-related organisations.

    Science.gov (United States)

    Chu, Samuel Kai Wah; Woo, Matsuko; King, Ronnel B; Choi, Stephen; Cheng, Miffy; Koo, Peggy

    2012-03-01

    This study surveyed Web 2.0 application in three types of selected health or medical-related organisations such as university medical libraries, hospitals and non-profit medical-related organisations. Thirty organisations participated in an online survey on the perceived purposes, benefits and difficulties in using Web 2.0. A phone interview was further conducted with eight organisations (26.7%) to collect information on the use of Web 2.0. Data were analysed using both quantitative and qualitative approaches. Results showed that knowledge and information sharing and the provision of a better communication platform were rated as the main purposes of using Web 2.0. Time constraints and low staff engagement were the most highly rated difficulties. In addition, most participants found Web 2.0 to be beneficial to their organisations. Medical-related organisations that adopted Web 2.0 technologies have found them useful, with benefits outweighing the difficulties in the long run. The implications of this study are discussed to help medical-related organisations make decisions regarding the use of Web 2.0 technologies. © 2011 The authors. Health Information and Libraries Journal © 2011 Health Libraries Group.

  18. Total System Performance Assessment - License Application Methods and Approach

    Energy Technology Data Exchange (ETDEWEB)

    J. McNeish

    2003-12-08

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issues (KTIs) identified in agreements with the U.S. Nuclear Regulatory Commission, the ''Yucca Mountain Review Plan'' (YMRP), ''Final Report'' (NRC 2003 [163274]), and the NRC final rule 10 CFR Part 63 (NRC 2002 [156605]). This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are used in this document.

  19. 77 FR 21592 - Guidelines for Preparing and Reviewing Licensing Applications for the Production of Radioisotopes

    Science.gov (United States)

    2012-04-10

    ... Licensing of Non-Power Reactors: Format and Content,'' for the production of radioisotopes and NUREG-1537, Part 2, ``Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors... by searching on http://www.regulations.gov under Docket ID NRC-2011-0135. You may submit comments by...

  20. Licensing process for future applications of advanced-design nuclear reactors

    International Nuclear Information System (INIS)

    Miller, C.L.

    1990-01-01

    The existing 10CFR50 two-step licensing process in the Code of Federal Regulations can continue to be a viable licensing vehicle for future applications, at least for the near future. The US Nuclear Regulatory Commission (NRC) Commissioners and staff, the public, and the utilities (along with supporting architect/engineers and nuclear steam supply system vendors) have a vast body of experience and knowledge of the existing part 50 licensing process. All these participants are familiar with their respective roles in this process, and history shows this process to be a workable licensing vehicle. Nevertheless, the use of 10CFR52 should be encouraged for future applications. This proposed new rule is intended to achieve the early resolution of licensing issues, to reduce the complexity and uncertainty of the licensing process, and enhance the safety and reliability of nuclear power plants. Part 52's overall purpose is to improve reactor safety and streamline the licensing process by encouraging the use of standard reactor designs and by allowing the early resolution of site environmental and reactor safety issues. The public should be afforded an earlier entry into the licensing process as a result of design certification rulemaking process and combined construction permit/operating license hearings

  1. Level of Awareness and Application of Personal and Organisational ...

    African Journals Online (AJOL)

    This study investigated the level of awareness and application of personal and organizational knowledge management by special librarians in South-West, Nigeria. Four research questions and two hypothesis guided the study. Questionnaire was used for the study. The population comprised fifty-four librarians from sixteen ...

  2. 78 FR 69852 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-11-21

    .... dba Freight Team dba iGlobal US (NVO & OFF), 15930 Valley Boulevard, City of Industry, CA 91744.... Amexlog Corporation dba Amex Logistics Corp (NVO & OFF), 1970 NW 70th Avenue, Miami, FL 33126. Officers... License. Canfleet Logistics Ltd. (NVO), 1408-700 West Pender Street, Vancouver, B.C. V6C 1G8. Officers...

  3. 76 FR 72409 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-11-23

    ... NVO Service. Pink City Logistics USA LLC (NVO & OFF), 7 Emily Road, Manalapan, NJ 07726; Officers... at (202) 523-5843 or by email at [email protected] . AE Eagle Logistics Inc. (NVO & OFF), 765 Route 83... License. Daybreak Logistics, Inc. (NVO & OFF), 2804 N. Cannon Blvd., Kannapolis, NC 28083; Officers...

  4. 77 FR 3773 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-01-25

    .... Hartwig Gdynia dba C. Hartwig Transport (NVO), 7, Derdowskiego Street, 81-369 Gdynia, Poland. Officers...: New OFF License. Cheryl G. Wilson dba JC Logistics (NVO & OFF), 28612 Redondo Beach Drive South, Des...: Add NVO Service. CR & J Logistics, Inc. dba Brightwater Shipping Services (NVO & OFF), 8401 Lake Worth...

  5. Use of limited information in a license application to construct a repository

    International Nuclear Information System (INIS)

    McGarry, J.M. III; Echols, F.S.

    1996-01-01

    The purpose of this paper is to provide a rationale for the proposition that the Department of Energy's (DOE's) submittal of a license application (LA) for the construction of a geologic repository to the Nuclear Regulatory Commission (NRC) may be, and arguably must be, based on statutorily-limited site characterization data and design information. The Nuclear Waste Policy Act of 1982 (NWPA), as amended, is the controlling statute for the disposal of spent nuclear fuel in a licensed geologic repository. Applicable NRC regulations for the licensing of such a repository are found for the most part in 10 C.F.R. Part 60

  6. Environmental Standard Review Plan for the review of license renewal applications for nuclear power plants

    International Nuclear Information System (INIS)

    O'Brien, J.; Kim, T.J.; Reynolds, S.

    1991-08-01

    The Environmental Standard Review Plan for the Review of License Applications for Nuclear Power Plants (ESRP-LR) is to be used by the NRC staff when performing environmental reviews of applications for the renewal of power reactor licenses. The use of the ESRP-LR provides a framework for the staff to determine whether or not environmental issues important to license renewal have been identified and the impacts evaluated and provides acceptance standards to help the reviewers comply with the National Environmental Policy Act

  7. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Standard review plan and acceptance criteria. NUREG - 1537, Part 2

    International Nuclear Information System (INIS)

    1996-02-01

    NUREG - 1537, Part 2 gives guidance on the conduct of licensing action reviews to NRC staff who review non-power reactor licensing applications. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination

  8. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Standard review plan and acceptance criteria. NUREG - 1537, Part 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    NUREG - 1537, Part 2 gives guidance on the conduct of licensing action reviews to NRC staff who review non-power reactor licensing applications. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

  9. 77 FR 74841 - Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2012-12-18

    ... patrons who access the restaurant by boat. l. Locations of the Application: A copy of the application is... Company; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is...

  10. Preparing to review the license application of the French geological disposal facility - Issues, challenges and perspectives

    International Nuclear Information System (INIS)

    Dandrieux, Geraldine

    2014-01-01

    This paper briefly describes the French context for GDR authorization, the French dedicated legislative framework (28 June 2006 Act on sustainable management of radioactive materials and waste), the challenges (regulatory issues, long-term project supervision, technical issues, procedural issues), and the preparing for the review of the DGR license application. A planning schedule is propose with Andra to submit license application for DGR in 2015

  11. Generic licensing issues applicable to Wolsong 3 and 4 licensing review

    International Nuclear Information System (INIS)

    Boyd, Frederick C.

    1994-01-01

    The Wolsong 3 and 4 nuclear power plants are of CANDU type which were designed according to the rules and regulations of the Atomic Energy Control Board (AECB) of Canada. In 1992 AECB staff issued a first formal report (to the AECB Board) on 'generic safety issues affecting power reactors'. This was followed by a second report in 1993. These reports dealt with safety issues associated with Canadian CANDU nuclear power plants that applied to all or several plants and were considered insufficiently resolved. In most cases the concern was lack of certainty in the related safety analyses. The AECB staff report of 1993 identified eight 'generic action items' and six 'long-term research issues', three of which AECB staff have indicated may be moved into the 'action' category. This report, prepared for the Korea Institute of Nuclear Safety (KINS), reviews the background of the AECB 'generic action items' and the three 'long-term research issues' noted above. It also reviews an additional topic - steam line failure outside of containment - which was included in the request from KINS. In all, twelve issues are covered. These background reviews are followed by a discussion of the relevance of each issue to the licensing review (for Construction Permit) of Wolsong 3 and 4 and recommended actions to be taken by KINS

  12. [Evaluation of Web-based software applications for administrating and organising an ophthalmological clinical trial site].

    Science.gov (United States)

    Kortüm, K; Reznicek, L; Leicht, S; Ulbig, M; Wolf, A

    2013-07-01

    The importance and complexity of clinical trials is continuously increasing, especially in innovative specialties like ophthalmology. Therefore an efficient clinical trial site organisational structure is essential. In modern internet times, this can be accomplished by web-based applications. In total, 3 software applications (Vibe on Prem, Sharepoint and open source software) were evaluated in a clinical trial site in ophthalmology. Assessment criteria were set; they were: reliability, easiness of administration, usability, scheduling, task list, knowledge management, operating costs and worldwide availability. Vibe on Prem customised by the local university met the assessment criteria best. Other applications were not as strong. By introducing a web-based application for administrating and organising an ophthalmological trial site, studies can be conducted in a more efficient and reliable manner. Georg Thieme Verlag KG Stuttgart · New York.

  13. 78 FR 73566 - Standard Format and Content for a License Application for an Independent Spent Fuel Storage...

    Science.gov (United States)

    2013-12-06

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0264] Standard Format and Content for a License...), DG-3042, ``Standard Format and Content for a License Application for an Independent Spent Fuel..., Form, and Contents,'' specifies the information that must be in an application for a license to store...

  14. 77 FR 33243 - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving...

    Science.gov (United States)

    2012-06-05

    ... expansion process, thermal expansion mismatch between the tube and tubesheet, and from the differential... NUCLEAR REGULATORY COMMISSION [NRC-2012-0125] Applications and Amendments to Facility Operating...

  15. Other best-estimate code and methodology applications in addition to licensing

    International Nuclear Information System (INIS)

    Tanarro, A.

    1999-01-01

    Along with their applications for licensing purposes, best-estimate thermalhydraulic codes allow for a wide scope of additional uses and applications, in which as realistic and realizable results as possible are necessary. Although many of these applications have been successfully developed nowadays, the use of best-estimate codes for applications other than those associated to licensing processes is not so well known among the nuclear community. This issue shows some of these applications, briefly describing their more significant and specific features. (Author)

  16. Preparing to Submit a License Application for Yucca Mountain

    International Nuclear Information System (INIS)

    W.J. Arthur; M.D. Voegele

    2005-01-01

    In 1982, the U.S. Congress passed the Nuclear Waste Policy Act, a Federal law that established U.S. policy for the permanent disposal of spent nuclear fuel and high-level radioactive waste. Congress amended the Act in 1987, directing the Department of Energy to study only Yucca Mountain, Nevada as the site for a permanent geologic repository. As the law mandated, the Department evaluated Yucca Mountain to determine its suitability as the site for a permanent geologic repository. Decades of scientific studies demonstrated that Yucca Mountain would protect workers, the public, and the environment during the time that a repository would be operating and for tens of thousands of years after closure of the repository. A repository at this remote site would also: preserve the quality of the environment; allow the environmental cleanup of Cold War weapons facilities; provide the nation with additional protection from acts of terrorism; and support a sound energy policy. Throughout the scientific evaluation of Yucca Mountain, there has been no evidence to disqualify Yucca Mountain as a suitable site for the permanent disposal of spent nuclear fuel and high-level radioactive waste. Upon completion of site characterization, the Secretary of Energy considered the results and concluded that a repository at Yucca Mountain would perform in a manner that protects public health and safety. The Secretary recommended the site to the President in February 2002; the President agreed and recommended to Congress that the site be approved. The Governor of Nevada submitted a notice of disapproval, and both houses of Congress acted to override the disapproval. In July 2002, the President's approval allowed the Department to begin the process of submittal of a license application for Yucca Mountain as the site for the nation's first repository for spent nuclear fuel and high-level radioactive waste. Yucca Mountain is located on federal land in Nye County in southern Nevada, an arid region

  17. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Format and Content. NUREG-1537, Part 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    NUREG - 1537, Part 1 gives guidance to non-power reactor licensees and applicants on the format and content of applications to the Nuclear Regulatory Commission for licensing actions. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

  18. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Format and Content. NUREG-1537, Part 1

    International Nuclear Information System (INIS)

    1996-02-01

    NUREG - 1537, Part 1 gives guidance to non-power reactor licensees and applicants on the format and content of applications to the Nuclear Regulatory Commission for licensing actions. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination

  19. 77 FR 12830 - Pershing County Water Conservation District; Notice of Intent To File License Application, Filing...

    Science.gov (United States)

    2012-03-02

    ... Water Conservation District; Notice of Intent To File License Application, Filing of Pre-Application.... Submitted by: Pershing County Water Conservation District (Pershing County). e. Name of Project: Humboldt... the Commission's regulations. h. Potential Applicant Contact: Bennie Hodges, Pershing County Water...

  20. Application of IC Card License for Road Transportation in Commercial Vehicles Supervision and Service

    Directory of Open Access Journals (Sweden)

    Li Weiwei

    2016-01-01

    Full Text Available IC card electronic license for road transport includes the IC card commercial vehicle’s certificate and IC card practitioner’s qualification certificate. In China, the IC card electronic license for road transport is the electronic ID card which must be carried by each commercial vehicles and practitioners. This paper briefly introduces the basic situation, data format and security keys architecture of IC card electronic license for road transportation of China. In order to strengthen the supervision and service of commercial vehicles, this paper puts forward the overall application framework of IC card electronic license for road transport. The application examples of IC card license in the supervision of passenger station, dangerous goods transport management, governance overload and logistics park and port area management are discussed. The practical application results show that the application of IC card electronic license for road transport is an important technical means to improve the supervision ability and service quality of the road transportation industry.

  1. 78 FR 54280 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2013-09-03

    ... the Commission's ``Agency Rules of Practice and Procedure'' in 10 CFR part 2. Interested person(s...-Filing system also distributes an email notice that provides access to the document to the NRC's Office... clarify language in the LSCS, Units 1 and 2, Technical Specifications (TS) applicable to the design...

  2. Resolving the issues arisen during the development of License Renewal Application at PAKS NPP

    International Nuclear Information System (INIS)

    Ratkai, Sandor; Katona, Tamas Janos

    2012-01-01

    Operational license of the four VVER-440/213 units at Paks NPP, Hungary is limited to the design lifetime of 30 years. Extension by an additional 20 years of the original license is one of the main goals of the plant owner. In 2008 a programme for long-term operation (LTO) was developed and submitted to the Hungarian Atomic Energy Authority. The LTO Programme defines the activities for ensuring the extension of the operational lifetime and contains the justification of the safe LTO. The LTO Programme has to be implemented and comprehensive justification of the safe LTO has to be provided in the formal License Renewal Applications unit by unit. This work has been completed by the end of 2011, and the application has been submitted for approval for the Unit 1. The authority review and the approval of the License Renewal Application for Unit 1 should be finished before the expiration of the original design lifetime in 2012. In line with the regulations and supporting the License Renewal Application, a large number of engineering tasks have been performed. In this paper the entire project will be reported. The issues will be discussed, which have been arisen during the development of the application. The difficulties caused by the Hungarian technical and regulatory peculiarities will be presented. (author)

  3. 78 FR 13342 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-02-27

    .... Officers: Keith Phillips, Vice President (QI), Glenn Henderson, President. Application Type: New NVO & OFF.... Officers: Paul Pellitieri, President (QI), Virginia Pellitieri, Vice President. Application Type: New NVO...

  4. 77 FR 73054 - Application for a License To Export Radioactive Waste

    Science.gov (United States)

    2012-12-07

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export Radioactive Waste Pursuant to 10 CFR 110.70(b) ``Public Notice of Receipt of an Application,'' please take notice that the Nuclear..., October 25, 2012, XW020, radioactive 1178 pounds disposal by the 11006061. waste in the (approximately...

  5. 77 FR 14445 - Application for a License To Export Steel Forging

    Science.gov (United States)

    2012-03-09

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export Steel Forging Pursuant to 10 CFR 110.70(b) ``Public Notice of Receipt of an Application,'' please take notice that the Nuclear... head steel February 7, 2012 forging. forging will be XR175 machined into the 11005983 finished vessel...

  6. 75 FR 15743 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2010-03-30

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export High-Enriched Uranium Pursuant to 10 CFR 110.70(c) ``Public notice of receipt of an application,'' please take notice that the...-Enriched 160.0 kilograms To fabricate fuel France. Complex, March 3, 2010. Uranium (93.35%). uranium (149...

  7. 75 FR 6223 - Application For a License To Export High-Enriched Uranium

    Science.gov (United States)

    2010-02-08

    ... NUCLEAR REGULATORY COMMISSION Application For a License To Export High-Enriched Uranium Pursuant to 10 CFR 110.70(c) ``Public notice of receipt of an application,'' please take notice that the..., Uranium (93.35%). uranium (16.3 targets for December 28, 2009, XSNM3623, kilograms U-235). irradiation in...

  8. 77 FR 1956 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2012-01-12

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export High-Enriched Uranium Pursuant to 10 CFR 110.70(b) ``Public Notice of Receipt of an Application,'' please take notice that the.... Security Complex. Uranium uranium (9.3 targets at December 21, 2011 (93.35%). kilograms U- CERCA AREVA...

  9. 75 FR 7525 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2010-02-19

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export High-Enriched Uranium Pursuant to 10 CFR 110.70(c) ``Public notice of receipt of an application,'' please take notice that the..., February 2, Uranium (93.35%). uranium (87.3 elements in 2010, February 2, 2010, kilograms U-235). France...

  10. 75 FR 71102 - White Mountain Hydroelectric Corp.; Notice of Application for Amendment of License, and...

    Science.gov (United States)

    2010-11-22

    ... Hydroelectric Corp.; Notice of Application for Amendment of License, and Soliciting Comments, Motions To Intervene, and Protests November 12, 2010. Take notice that the following hydroelectric application has been... Hydroelectric Corp. e. Name of Project: Apthorp Hydroelectric Project. f. Location: The project is located on...

  11. 76 FR 4417 - Liberty Natural Gas LLC, Liberty Liquefied Natural Gas (LNG) Deepwater Port License Application

    Science.gov (United States)

    2011-01-25

    ... DEPARTMENT OF TRANSPORTATION Maritime Administration [USCG-2010-0993] Liberty Natural Gas LLC, Liberty Liquefied Natural Gas (LNG) Deepwater Port License Application AGENCY: Maritime Administration... application describes an offshore natural gas deepwater port facility that would be located approximately 16.2...

  12. 77 FR 76483 - Ocean Transportation Intermediary License Applicants The Commission gives notice that the...

    Science.gov (United States)

    2012-12-28

    ... Transport Co., PAC International Logistics Company, & Book Express Network. Stealth Logistics LLC (NVO & OFF.... Application Type: QI Change. Efrinsa Global Logistics Inc. (NVO & OFF), 8441 NW 68th Street, Miami, FL 33166... (QI), Sheila E. Lawrence, President. Application Type: New OFF License. MMC Logistics, LLC (OFF), 2853...

  13. 75 FR 61474 - Juneau Hydropower, Inc.; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2010-10-05

    ... Hydropower, Inc.; Notice of Intent To File License Application, Filing of Pre-Application Document, and....: 13563-001. c. Dated Filed: July 28, 2010. d. Submitted By: Juneau Hydropower, Inc. e. Name of Project... Commission's regulations. h. Potential Applicant Contact: Duff W. Mitchell, Juneau Hydropower, Inc., P.O. Box...

  14. 78 FR 28845 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-05-16

    ..., President, Application Type: QI Change Contract Logistics, LLC (NVO), 4911 North Portland Avenue, Suite 200..., Application Type: Add Trade Name Smart Lines Worldwide Feiliks Global Logistics Corporation (NVO), 176-20 S..., Director, Application Type: QI Change Intermodal Tank Transport (USA), Inc. (NVO), 2537 S. Gessner, Suite...

  15. Information to be submitted in support of licensing applications for nuclear power plants

    International Nuclear Information System (INIS)

    1979-01-01

    This Safety Guide was prepared as part of the Agency's programme, referred to as the NUSS programme, for establishing Codes of Practice and Safety Guides relating to nuclear power plants. It supplements the Agency's Safety Series No.50-C-G, entitled ''Governmental Organization for the Regulation of Nuclear Power Plants: A Code of Practice''. It is concerned with the content of documents which should be submitted to the regulatory body by the applicant/licensee in support of licensing applications, with a possible method of classifying these documents and with the scheduling of their submission to the regulatory body at each major stage of the licensing process

  16. Use of annotated outlines to prepare guidance for license applications for the MRS and MGDS

    International Nuclear Information System (INIS)

    Roberts, J.; Griffin, W.R.

    1992-01-01

    This paper reports that the Office of Civilian Radioactive Waste Management (OCRWM) has embarked on an aggressive program to develop guidance for preparation of the License Applications for the Mined Geological Disposal System (MGDS) and Monitored Retrievable Storage (MRS). The endeavor is a team effort that will utilize personnel and funding from the Office of Systems and Compliance at DOE Headquarters, the MRS Project (i.e., DOE Office of Storage and Transportation) and the Yucca Mountain Project (i.e., DOE Office of Geologic Disposal). The endeavor was initiated in the Spring of 1991. It will continue via an iterative process until License Applications are completed for the MRS and MGDS projects

  17. Application of probabilistic risk assessment in nuclear and environmental licensing processes of nuclear reactors in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Mata, Jonatas F.C. da; Vasconcelos, Vanderley de; Mesquita, Amir Z., E-mail: jonatasfmata@yahoo.com.br, E-mail: vasconv@cdtn.br, E-mail: amir@cdtn.br [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2015-07-01

    The nuclear accident at Fukushima Daiichi, occurred in Japan in 2011, brought reflections, worldwide, on the management of nuclear and environmental licensing processes of existing nuclear reactors. One of the key lessons learned in this matter, is that the studies of Probabilistic Safety Assessment and Severe Accidents are becoming essential, even in the early stage of a nuclear development project. In Brazil, Brazilian Nuclear Energy Commission, CNEN, conducts the nuclear licensing. The organism responsible for the environmental licensing is Brazilian Institute of Environment and Renewable Natural Resources, IBAMA. In the scope of the licensing processes of these two institutions, the safety analysis is essentially deterministic, complemented by probabilistic studies. The Probabilistic Safety Assessment (PSA) is the study performed to evaluate the behavior of the nuclear reactor in a sequence of events that may lead to the melting of its core. It includes both probability and consequence estimation of these events, which are called Severe Accidents, allowing to obtain the risk assessment of the plant. Thus, the possible shortcomings in the design of systems are identified, providing basis for safety assessment and improving safety. During the environmental licensing, a Quantitative Risk Analysis (QRA), including probabilistic evaluations, is required in order to support the development of the Risk Analysis Study, the Risk Management Program and the Emergency Plan. This article aims to provide an overview of probabilistic risk assessment methodologies and their applications in nuclear and environmental licensing processes of nuclear reactors in Brazil. (author)

  18. Application of probabilistic risk assessment in nuclear and environmental licensing processes of nuclear reactors in Brazil

    International Nuclear Information System (INIS)

    Mata, Jonatas F.C. da; Vasconcelos, Vanderley de; Mesquita, Amir Z.

    2015-01-01

    The nuclear accident at Fukushima Daiichi, occurred in Japan in 2011, brought reflections, worldwide, on the management of nuclear and environmental licensing processes of existing nuclear reactors. One of the key lessons learned in this matter, is that the studies of Probabilistic Safety Assessment and Severe Accidents are becoming essential, even in the early stage of a nuclear development project. In Brazil, Brazilian Nuclear Energy Commission, CNEN, conducts the nuclear licensing. The organism responsible for the environmental licensing is Brazilian Institute of Environment and Renewable Natural Resources, IBAMA. In the scope of the licensing processes of these two institutions, the safety analysis is essentially deterministic, complemented by probabilistic studies. The Probabilistic Safety Assessment (PSA) is the study performed to evaluate the behavior of the nuclear reactor in a sequence of events that may lead to the melting of its core. It includes both probability and consequence estimation of these events, which are called Severe Accidents, allowing to obtain the risk assessment of the plant. Thus, the possible shortcomings in the design of systems are identified, providing basis for safety assessment and improving safety. During the environmental licensing, a Quantitative Risk Analysis (QRA), including probabilistic evaluations, is required in order to support the development of the Risk Analysis Study, the Risk Management Program and the Emergency Plan. This article aims to provide an overview of probabilistic risk assessment methodologies and their applications in nuclear and environmental licensing processes of nuclear reactors in Brazil. (author)

  19. 75 FR 32780 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-06-09

    .../Secretary, (Qualifying Individual), Bengt R. Anderson, President, Application Type: QI Change. Cargomar... Corp. (OFF & NVO), 6301 E. 10th Avenue, Hialeah, FL 33013, Officers: Marjorie E. Morales, Operation...

  20. 76 FR 19097 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-04-06

    ... Sachs, Partner/Logistics Manager (Qualifying Individual), Ali Ismailzada, Partner/CFO, Application Type... at (202) 523-5843 or by e-mail at [email protected] . Agility Logistics Corp. (OFF), 240 Commerce, Irvine... Avenue, Newark, NJ 07083, Officer: Hakeem K. Bisiolu, Member/Manager (Qualifying Individual), Application...

  1. 77 FR 23719 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-04-20

    ... Logistics, Inc. (NVO & OFF), 180 Champion Way, Northlake, IL 60164. Officers: David F. Gross, CEO (Qualifying Individual), Lance A. Lucibello, Vice President. Application Type: QI Change. CMA CGM Logistics... Fafoutis, General Manager (Qualifying Individual), Frank J. Baragona, Director. Application Type: New NVO...

  2. 75 FR 6398 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-02-09

    ... Forwarder Transportation Intermediary Applicants Best Way Logistics Corp., 901 SW. 98th Terrace, Pembroke..., Officers, Alessandro E. Bernardini, Sales Manager, (Qualifying Individual), Glenda Valdez, President... Intermediary Applicants (Cont'd): Vortex Worldwide Logistics Corp., 10125 NW. 116th Way, 10, Miami, FL 33178...

  3. 75 FR 66099 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-10-27

    ... Logistics, Inc. (NVO), 17890 Castleton Street, Suite 398, City of Industry, CA 91748, Officers: Jennifer X... (Qualifying Individual), Application Type: QI Change. Concert Group Logistics, Inc. (NVO & OFF), 1430 Branding... Individual), Daniel Para, CEO, Application Type: QI Change. De Well Logistics LLC dba De Well Logistics, dba...

  4. 75 FR 60124 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-09-29

    ... Individual), Sharlene Chesnes, EVP/COB/EVP/Secretary, Application Type: QI Change IAL Container Line (USA..., Vice President (Qualifying Individual), Arjun Menon, Director, Application Type: QI Change LTA Import & Export, Inc. (NVO & OFF), 14331 SW 120th Street, 203, Miami, FL 33186, Officers: Eric E. Diaz, Director...

  5. Licensing requirements for initial commissioning programs in Spain: Application to different PWR designs

    International Nuclear Information System (INIS)

    Munuera, A.; Conde, J.M.; Martinez, J.

    1991-01-01

    This paper describes the overall licensing process in Spain, focusing on the initial commissioning requirements. The significance of this part of the regulatory work is evident both from the licensing and the licensee's points of view. Licensing in Spain is ruled by different laws which determine the general requirements and fix the licensing frame. Being a nuclear technology importer country, the base of the regulatory work lies on the rules and regulations of the country of origin of the planet, with the addition of case specific requirements. The application of this methodology to plants designed in different countries produces licensing processes which are similar to the overall, but very different in its development. It also means a special technical effort on the part of the regulatory body to cope with the problems arising from the use of different technologies and safety standards. The start-up programs from fuel loading to full power of a Westinghouse plant (Vandellos 2) and a Siemens-KWU plant (Trillo 1) are compared from the technical point of view, enhancing the differences that can be relevant for the regulatory work. The difficulties arising from the application of both the German and US concepts are discussed. (orig.)

  6. Guide for the preparation of applications for licenses for the use of sealed sources in portable gauging devices

    International Nuclear Information System (INIS)

    1985-01-01

    The purpose of this regulatory guide is to provide assistance to applicants and licensees in preparing applications for new licenses, license amendments, and license renewals for the use of sealed sources in portable gauging devices. An example of a portable gauging device is a moisture-density gauge that contains a gamma-emitting sealed source, cesium-137, and a sealed neutron source, americium-242-beryllium

  7. 75 FR 52343 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-08-25

    ... Company, Inc. (NVO & OFF), 4529 Angeles Crest Highway, Suite 300, La Canada, CA 91011, Officers: Ernest V..., Application Type: QI Change. BestOcean Worldwide Logistics, Inc. (OFF & NVO), 1300 Valley Vista Drive, Suite...

  8. 76 FR 67188 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-10-31

    ... Liability Company, dba GlobalForwarding.com dba Forwardingservices.com dba Containerquote.com dba Global.../CEO/CFO, Application Type: QI Change. Unicorn Shipping, Inc. (NVO & OFF), 1225 W. 190th Street, Suite...

  9. 78 FR 30921 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-05-23

    .... (NVO & OFF), 2500 Wilcrest Drive, Suite 300, Houston, TX 77042, Officers: Myrian T. Morales, Vice..., FL 33178, Officer: Jose R. Gantus, President (QI), Application Type: QI Change XL Worldwide Corp...

  10. 76 FR 10593 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-02-25

    ... Individual), Steven L. Leturno, Director, Application Type: QI Change. Combined Freight System, Inc. (NVO...), 148-08 Guy R. Brewer Blvd., Jamaica, NY 11434, Officers: Wei Hu, Vice President, (Qualifying...

  11. 76 FR 71608 - Notice of Availability of Combined License Applications

    Science.gov (United States)

    2011-11-18

    ...://www.nrc.gov/reactors/new-reactors/col.html . FOR FURTHER INFORMATION CONTACT: Donald Habib, Office of..., email: Donald.Habib@nrc.gov . SUPPLEMENTARY INFORMATION: The following parties have filed applications...

  12. 76 FR 77021 - Notice of Availability of Combined License Applications

    Science.gov (United States)

    2011-12-09

    ...://www.nrc.gov/reactors/new-reactors/col.html . FOR FURTHER INFORMATION CONTACT: Donald Habib, Office of..., email: Donald.Habib@nrc.gov . SUPPLEMENTARY INFORMATION: The following parties have filed applications...

  13. 76 FR 72725 - Notice of Availability of Combined License Applications

    Science.gov (United States)

    2011-11-25

    ...://www.nrc.gov/reactors/new-reactors/col.html . FOR FURTHER INFORMATION CONTACT: Donald Habib, Office of..., email: Donald.Habib@nrc.gov . SUPPLEMENTARY INFORMATION: The following parties have filed applications...

  14. 78 FR 10173 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-02-13

    ... Road, Scituate, MA 02066, Officers: Stephen J. Zambo, Member (QI), Stephen A. Zambo, Member... 60007, Officers: Joshua H. Chau, President (QI), Bessie S. Chau, Secretary, Application Type: New NVO...

  15. 75 FR 28250 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-05-20

    ... Type: Add NVO Service and QI Change. Best Container Express, Inc. (NVO), 17238 S. Main Street, Gardena...). Peixin Li, President. Application Type: Add OFF Services. Project Rail, LLC dba Vectora Transportation...

  16. 76 FR 12962 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-03-09

    ... L. Li, President, Application Type: QI Change. EP-Team, Inc. dba EP-Team (NVO & OFF), 3700 Forums... Maritime Services USA (NVO), 425 West Main Street, Alhambra, CA 91801. Officers: Hans P. Hofmann, Assistant...

  17. 77 FR 32115 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-05-31

    ... Individual), Lar D. Westerberg, CEO, Application Type: Add NVO Service. Jo-Sak Shipping USA, Inc. (NVO & OFF... Service. Waterline International Logistics, Inc. (NVO & OFF), 24178 Alicia Parkway, Mission Viejo, CA...

  18. Pesticide Applicator Profiling: Using Polycom[R] Distance Delivery for Continuing Education and Characterizing Florida's Licensed Applicators

    Science.gov (United States)

    Fishel, Fred; Langeland, Ken

    2011-01-01

    The University of Florida offers continuing education units (CEUs) via distance technology using Polycom[R] to meet requirements for applicators of pesticides to renew their licenses. A large statewide event conducted in 2010 also included a needs assessment of this group concerning CEUs. Results indicate that these applicators strongly prefer…

  19. 77 FR 34030 - BOST1 Hydroelectric LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2012-06-08

    ... Hydroelectric LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and.... Date Filed: March 21, 2012. d. Submitted By: BOST1 Hydroelectric LLC (BOST1). e. Name of Project: Coon Rapids Dam Hydroelectric Project. f. Location: Mississippi River in Hennepin and Anoka counties...

  20. 77 FR 6552 - Mahoning Hydropower, LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2012-02-08

    ... Hydropower, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and...: December 7, 2011. d. Submitted By: Mahoning Hydropower, LLC. e. Name of Project: Berlin Lake Hydroelectric... Hydropower, LLC, 11365 Normandy Lane, Chagrin Falls, OH 44023; (440) 804-6627; [email protected] i. FERC...

  1. 78 FR 45578 - Application For a License to Export Radioactive Waste

    Science.gov (United States)

    2013-07-29

    ... NUCLEAR REGULATORY COMMISSION Application For a License to Export Radioactive Waste Pursuant to 10..., 2013, radioactive waste authorized for disposal by the XW021, 11006101. as contaminated export will not original secondary waste exceed quantities generators, as resulting from imported in required or the...

  2. 77 FR 73056 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2012-12-07

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export High-Enriched Uranium Pursuant... Complex. Uranium (93.2%). uranium-235 at CERCA AREVA Romans October 10, 2012 contained in 6.2 in France and to October 12, 2012 kilograms irradiate targets at XSNM3729 uranium. the BR-2 Research 11006053...

  3. 77 FR 73055 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2012-12-07

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export High-Enriched Uranium Pursuant.... Security Complex. Uranium uranium-235 at CERCA AREVA October 10, 2012 (93.35%). contained in Romans in France October 12, 2012 10.1 kilograms and to irradiate XSNM3730 uranium. targets at the HFR 11006054...

  4. 77 FR 51579 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2012-08-24

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export High-Enriched Uranium Pursuant.... Complex, July 30, 2012, August Uranium (93.35%). uranium-235 high-enriched 1, 2012, XSNM3726, 11006037. contained in 7.5 uranium in the kilograms uranium. form of broken metal to the Atomic Energy of Canada...

  5. 78 FR 33448 - Application for a License To Export High-Enriched Uranium

    Science.gov (United States)

    2013-06-04

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export High-Enriched Uranium Pursuant.... Security Complex, May 13, Uranium (93.35%). uranium-235 at the National 2013, May 21, 2013, XSNM3745, contained in 7.5 Research Universal 11006098. kilograms reactor in Canada for uranium. ultimate use in...

  6. 18 CFR 131.20 - Application for approval of transfer of license.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Application for approval of transfer of license. 131.20 Section 131.20 Conservation of Power and Water Resources FEDERAL... a citizen of the United States of America. Subscribed and sworn to before me, a notary public of the...

  7. 75 FR 467 - Notice of Opportunity for Hearing, License Application Request of Powertech (USA) Inc. Dewey...

    Science.gov (United States)

    2010-01-05

    ... Hearing, License Application Request of Powertech (USA) Inc. Dewey-Burdock In Situ Uranium Recovery... Regulatory Commission (NRC) for the Dewey-Burdock In Situ Recovery Facility in Fall River and Custer Counties, South Dakota. The Dewey-Burdock facility would involve the recovery of uranium by in situ recovery (ISR...

  8. Shirley Basin Uranium Mill. Environmental report to accompany source material license application

    International Nuclear Information System (INIS)

    1975-12-01

    This document summarizes all of the environmental monitoring conducted by Utah. This Environmental Report consequently supplements and updates the information presented in the Source Material License application of August 18, 1970 and the Final Environmental Statement (FES) of December 1974. Water and air quality, liquid waste management, soil/vegetation monitoring, and reclamation are covered

  9. Standard format and content of license applications for plutonium processing and fuel fabrication plants

    International Nuclear Information System (INIS)

    1976-01-01

    The standard format suggested for use in applications for licenses to possess and use special nuclear materials in Pu processing and fuel fabrication plants is presented. It covers general description of the plant, summary safety assessment, site characteristics, principal design criteria, plant design, process systems, waste confinement and management, radiation protection, accident safety analysis, conduct of operations, operating controls and limits, and quality assurance

  10. 76 FR 63668 - Guidelines for Preparing and Reviewing Licensing Applications for the Production of Radioisotopes

    Science.gov (United States)

    2011-10-13

    ..., Research and Test Reactors Projects Branch, Division of Policy and Rulemaking, Office of Nuclear Reactor... NUCLEAR REGULATORY COMMISSION [NRC-2011-0135] Guidelines for Preparing and Reviewing Licensing Applications for the Production of Radioisotopes AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim...

  11. NEP Nuclear Power Plant, Units 1 and 2. License application, general and financial information

    International Nuclear Information System (INIS)

    1976-01-01

    A license application is presented for 2 pressurized water reactors at a proposed location in Charlestown RI. Each reactor will have a net capacity of 1150 MW. Cooling water will be supplied by the Atlantic Ocean. NEP-1 is scheduled for operation in 1983 and NEP-2 in 1985

  12. 76 FR 71082 - Strata Energy, Inc., Ross Uranium Recovery Project; New Source Material License Application...

    Science.gov (United States)

    2011-11-16

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 40-9091; NRC-2011-0148] Strata Energy, Inc., Ross Uranium Recovery Project; New Source Material License Application; Notice of Intent To Prepare a... intent to prepare a supplemental environmental impact statement. SUMMARY: Strata Energy, Inc. (Strata...

  13. 78 FR 40519 - Cooper Nuclear Station; Application and Amendment to Facility Operating License Involving...

    Science.gov (United States)

    2013-07-05

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-298; NRC-2013-0139] Cooper Nuclear Station; Application and Amendment to Facility Operating License Involving Proposed No Significant Hazards..., issued to Nebraska Public Power District (the licensee), for operation of the Cooper Nuclear Station (CNS...

  14. 78 FR 64493 - Juneau Hydropower, Inc.; Notice of Subsequent Draft License Application (DLA) and Draft...

    Science.gov (United States)

    2013-10-29

    ... Hydropower, Inc.; Notice of Subsequent Draft License Application (DLA) and Draft Preliminary Draft... Hydropower, Inc. e. Name of Project: Sweetheart Lake Hydroelectric Project. f. Location: At the confluence of..., Business Manager, Juneau Hydropower, Inc., P.O. Box 22775, Juneau, AK 99802; 907-789-2775, email: duff...

  15. 76 FR 52994 - Application for a License To Export Heavy Water

    Science.gov (United States)

    2011-08-24

    ... NUCLEAR REGULATORY COMMISSION Application for a License To Export Heavy Water Pursuant to 10 CFR... (liters). producing an active water). pharmaceutical ingredient known as CTP-499, which incorporates heavy water as the source of deuterium to achieve the hydrogen-deuterium exchange. November 30, 2010 December...

  16. 76 FR 53693 - Notice of Invitation To Participate; Coal Exploration License Application COC-74911, Colorado

    Science.gov (United States)

    2011-08-29

    ...] Notice of Invitation To Participate; Coal Exploration License Application COC-74911, Colorado AGENCY: Bureau of Land Management, Interior. ACTION: Notice. SUMMARY: Pursuant to the Mineral Leasing Act of 1920... America in lands located in Delta County, Colorado. DATES: This notice of invitation was published in the...

  17. NPP long term operation in Spain - First application for license renewal

    International Nuclear Information System (INIS)

    Francia, L.; Gorrochategui, I.; Marcos, R.

    2007-01-01

    Full text: In the operation of the Spanish nuclear power plants (NPP), safety is always the prime consideration. Plant Life Management Programmes have been set up with the strategic objective to operate the NPPs as long as they are considered safe and reliable. The safety of each NPP is reviewed by the Spanish nuclear regulatory authority (CSN) under a continuous process. In addition, experience is gained from operating the plants and from exchanges with operators of similar units. Current Spanish regulatory framework for renewing NPP operating licenses requires performing a Periodic Safety Review (PSR) to be performed every 10 years and submitted when applying for a new renewal of the NPP operating license. A few years ago, CSN issued a document regarding the licensing requirements that nuclear power plants should meet in order to be granted with an operating license for long term operation (i.e, operation beyond the original plant design life, typically 40 years). Besides the traditional PSR requirements, specific requirements regarding to long term operation (LTO) include: - An Aging Management and Evaluation Program, including the identification and evaluation of Time Limited Aging Analysis (TLAA). - An updated Radiological Impact Study. - A review and assessment of regulation/standard applicability. Garona NPP (GE, BWR/3 design) operated by Spanish utility Nuclenor from 1971 has a current operating license up to 2009. A decision was made to apply for a new operating license, being Garona plant the first one in Spain to face with the new long term operation requirements. The paper will provide an overview of the methodology used in Spain to address and perform the required analyses to support the LTO application for the operating license renewal. In particular, focus will be paid on the project developed in Garona (2002-2006) whose result has been the first Spanish application for License Renewal for LTO. Also it will be reported the ongoing work necessary to

  18. 76 FR 25690 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-05-05

    .... Capital Logistics CHB Corp. (NVO & OFF), 6000 NW 97th Avenue, 9-10, Miami, FL 33178, Officers: Manuel G..., San Diego, CA 92126, Officers: Alex O. De Guzman, President, (Qualifying Individual), Abraham B. Lanuzga, Vice President, Application Type: Business Structure Change. Embarque Bandera Shipping, Inc. (NVO...

  19. 10 CFR 40.31 - Application for specific licenses.

    Science.gov (United States)

    2010-01-01

    ... response organizations expected to respond in case of an accident 60 days to comment on the licensee's... environment shall be filed at least 9 months prior to commencement of construction of the plant or facility in... case of renewal applications submitted before July 27, 1990, this submittal may follow the renewal...

  20. 76 FR 9015 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-02-16

    ... Global Logistics, LLC (NVO & OFF), 53 Perimeter Center East, Suite 450, Atlanta, GA 30346. Officer: Chad... Street, Doral, FL 33126. Officers: Juan P. Constain, General Manager (Qualifying Individual), Santiago...). Application Type: Add NVO Service. CoscoEx (CGL), Inc. dba Citic Global Logistics dba Chimerica Global...

  1. 76 FR 71034 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-11-16

    ... at (202) 523-5843 or by email at [email protected] . AAB Global Logistics, LLC (NVO & OFF), 201 E. Dundee...), Robert E. Cleary, Manager. Application Type: Name Change. Abco International Freight (USA) Inc. dba Abco Logistics (NVO), 9420 Telstar Avenue, 203, El Monte, CA 91731. Officers: Shermin Kong, Treasurer (Qualifying...

  2. 78 FR 63475 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-10-24

    ... dba Fachel Shipping & Logistics (NVO & OFF), 6331 Belair Road, Baltimore, MD 21206, Officers: Chinyere W. Osasuyi, Chief Executive Manager (QI), Famous I. Osasuyi, Chief Executive Member. Application... Change. Perimeter International dba Perimeter Logistics (NVO & OFF), 2700 Story Road, Suite 150, Irving...

  3. Barnwell Nuclear Fuel Plant. License application, amendment 10

    International Nuclear Information System (INIS)

    1975-01-01

    Amendment No. 10 provides the applicant's responses to questions raised by the AEC in letters dated November 6 and December 5, 1974. Amendment No. 3, dated February 1975, to the BNFP Separations Facility Final Safety Analysis Report (FSAR) is included. The amendment consists of revision pages for volumes 1 through 5 of the FSAR along with a deletion and insertion guide. (U.S.)

  4. 7 CFR 46.4 - Application for license.

    Science.gov (United States)

    2010-01-01

    ... principal office. A limited liability company shall also furnish a copy of its articles of organization and... the trustee must be furnished. If the applicant is a limited liability company and a member or holder of more than 10 percent of the ownership stake is a partnership, another limited liability company...

  5. 75 FR 42446 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-07-21

    ... Transportation Intermediary (OTI) pursuant to section 19 of the Shipping Act of 1984 as amended (46 U.S.C... Shipping Limited (NVO), 1000 Corporate Center Drive, Suite 320, Monterey Park, CA 91754. Officers: Joey Tam, President/CEO (Qualifying Individual), Yu C. Lee, Secretary/Treasurer. Application Type: Name Change. Ever...

  6. 75 FR 63476 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2010-10-15

    .... David A. Knott dba DAK Logistics Services (NVO), 1010 Bluejay Drive, Suisun City, CA 94585. Officer... Office of Transportation Intermediaries, Federal Maritime Commission, Washington, DC 20573. ACS Logistics.... Application Type: QI Change. Archer Logistics USA LLC (NVO), 6051 Kennedy Boulevard East, PhB, West New York...

  7. 78 FR 23252 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-04-18

    .... Logistics, Inc. dba BE Logistics dba Belogistics dba Core Logistics (NVO), 12911 Simms Avenue, Hawthorn, CA... (QI), Kevin L. Miller, Secretary, Application Type: QI Change Triple Eagle Logistics Inc. dba Triple Eagle Logistic Canada Inc. (NVO & OFF), 17890 Castleton Street, Suite 367, City of Industry, CA 91748...

  8. 77 FR 9657 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-02-17

    ..., Owner, Application Type: Add OFF Service. Cargo Tours International, Inc. dba CTI Global Logistics (NVO.... Deckwell Sky (USA) Inc. dba Monarch Container Line (NVO & OFF), 14343 E. Don Julian Road, City of Industry.... Logistics, Inc. (NVO & OFF), 3905 West Albany Street, McHenry, IL 60050, Officers: Arthur N. Nutig, Chief...

  9. 78 FR 78956 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-12-27

    ... & OFF), 1515 Kona Drive, Compton, CA 90220, Officers: Won Rok (aka Steve) Choi, CFO (QI), Myeong H. Kim..., El Monte, CA 91731, Officers: Lynn H. Tran, Secretary (QI), Zheng Feng, CFO, Application Type: New.... 25th Street, Suite 107D, Miami, FL 33182, Officers: Sergio I. Lotero, President (QI), Stephen A. Blass...

  10. 78 FR 68444 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-11-14

    ... (America), Ltd. (NVO & OFF), 21061 S. Western Avenue, Suite 300, Torrance, CA 90501-1122, Officers: Mary M..., Officers: Kimberly A. Whisler Wagner, Member Manager (QI), Kara M. Norkus, Member Manager, Application Type..., Iselin, NJ 08830, Officers: Richard Kenyon, President (QI), Fernando Valenzuela, Global President...

  11. 77 FR 21559 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-04-10

    ... Individual). Luis Angel Rincon, Manager. Application Type: Business Structure Change and Add NVO Service. Dix.... Global Distribution & Logistics LLC (NVO & OFF), 7977 NW 21st Street, Miami, FL 33122. Officers: Jose L...: Edward J. Hathaway, Vice President-- Business Development (Qualifying Individual). Jeff Harvey, President...

  12. 78 FR 48435 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-08-08

    ..., Washington, DC 20573, by telephone at (202) 523-5843 or by email at [email protected] . A & J Cargo Logistics Inc... (QI), Application Type: Add Trade Name Arabia Cargo and OFF Service. CMX Global Logistics, LLC (NVO... Transport Co., Ltd. (NVO), 13101 Moore Street, Cerritos, CA 90703, Officers: Ki Hyeon Lee, CFO (QI), Seong...

  13. 78 FR 56229 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-09-12

    ..., Washington, DC 20573, by telephone at (202) 523-5843 or by email at [email protected] . ATS Logistics, LLC (NVO... Logistics Services, Inc. (NVO & OFF), One Cross Island Plaza, Suite 111, Rosedale, NY 11422, Officer: Jimmy..., Secretary, Application Type: QI Change World Link Transport, Inc. (NVO & OFF), 1220 Kona Drive, Compton, CA...

  14. 76 FR 31962 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-06-02

    .... International First Service USA, Inc. dba Global Wine Logistics, Inc. (NVO & OFF), 197 Route 18 South, Suite..., President, Application Type: Add NVO Service. Nano Express Corp. (NVO,) 5765 N. Lincoln Avenue, Suite 17... Zai Ocean Services dba Zai Container Line (NVO & OFF), 6324 NW 97th Avenue, Doral, FL 33178, Officer...

  15. 77 FR 35079 - License Renewal Application for Seabrook Station, Unit 1 ; NextEra Energy Seabrook, LLC

    Science.gov (United States)

    2012-06-12

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-443; NRC-2010-0206] License Renewal Application for Seabrook Station, Unit 1 ; NextEra Energy Seabrook, LLC AGENCY: Nuclear Regulatory Commission. ACTION: License renewal application; intent to prepare supplement to draft [[Page 35080

  16. Do US Medical Licensing Applications Treat Mental and Physical Illness Equivalently?

    Science.gov (United States)

    Gold, Katherine J; Shih, Elizabeth R; Goldman, Edward B; Schwenk, Thomas L

    2017-06-01

    State medical licensing boards are responsible for evaluating physician impairment. Given the stigma generated by mental health issues among physicians and in the medical training culture, we were interested in whether states asked about mental and physical health conditions differently and whether questions focused on current impairment. Two authors reviewed physician medical licensing applications for US physicians seeking first-time licensing in 2013 in the 50 states and the District of Columbia. Questions about physical and mental health, as well as substance abuse, were identified and coded as to whether or not they asked about diagnosis and/or treatment or limited the questions to conditions causing physician impairment. Forty-three (84%) states asked questions about mental health conditions, 43 (84%) about physical health conditions, and 47 (92%) about substance use. States were more likely to ask for history of treatment and prior hospitalization for mental health and substance use, compared with physical health disorders. Among states asking about mental health, just 23 (53%) limited all questions to disorders causing functional impairment and just 6 (14%) limited to current problems. While most state medical licensing boards ask about mental health conditions or treatment, only half limited queries to disorders causing impairment. Differences in how state licensing boards assess mental health raise important ethical and legal questions about assessing physician ability to practice and may discourage treatment for physicians who might otherwise benefit from appropriate care.

  17. Organisational intelligence and distributed AI

    OpenAIRE

    Kirn, Stefan

    1995-01-01

    The analysis of this chapter starts from organisational theory, and from this it draws conclusions for the design, and possible organisational applications, of Distributed AI systems. We first review how the concept of organisations has emerged from non-organised black-box entities to so-called computerised organisations. Within this context, organisational researchers have started to redesign their models of intelligent organisations with respect to the availability of advanced computing tec...

  18. Applicability of the Organisational Climate Description Questionnaire - Rutgers Elementary: a South African case study

    Directory of Open Access Journals (Sweden)

    D Vos

    2013-01-01

    Full Text Available The Organisational Climate Description Questionnaire - Rutgers Elementary (OCDQ - RE was used to determine the current organizational climate of primary schools in North-West Province, South Africa. This questionnaire evaluates the actions of principals and educators; the current organizational climate in primary schools can be determined from the results. A quantitative research approach, with 904 teachers from 68 schools, was used to determine the applicability of the measuring instrument. Exploratory and confirmatory factor analyses revealed that certain items measuring directive behaviour in the OCDQ-RE grouped with supportive behaviour of the principal. Hence, in this study, these items were regarded as supportive towards the educators and their work by the respondents. According to Cronbach's alpha coefficient the questionnaire can be regarded as reliable. Recommendations are made to render the questionnaire even more applicable for the South African context.

  19. Standard format and content for a license application to store spent fuel and high-level radioactive waste

    International Nuclear Information System (INIS)

    1989-09-01

    Subpart B, ''License Application, Form, and Contents,'' of 10 CFR Part 72, ''Licensing Requirements for the Independent Storage of Spent Nuclear Fuel and High-Level Radioactive Waste,'' specifies the information to be covered in an application for a license to store spent fuel in an independent spent fuel storage installation (ISFSI) or to store spent fuel and high-level radioactive waste in a monitored retrievable storage facility (MRS). However, Part 72 does not specify the format to be followed in the license application. This regulatory guide suggests a format acceptable to the NRC staff for submitting the information specified in Part 72 for license application to store spent fuel in an ISFSI or to store spent fuel and high-level radioactive waste in an MRS

  20. The regulatory review of construction license application and the supporting safety case

    International Nuclear Information System (INIS)

    Heinonen, Jussi

    2014-01-01

    Finland is one of the foremost countries in the world in developing the disposal of spent fuel. The construction license application for the Olkiluoto spent fuel disposal facility was submitted to the authorities at the end of 2012 and the facility is expected to start operation around 2020. This has been a long-term project with over 30 years of parallel development of the repository project and the regulatory approach to spent fuel management. In 1983 the government made a strategic decision on the objectives and target time schedule for the research, development and technical planning of nuclear waste management. While an export and international disposal solution was still the preferred option, this decision required the licensees without this possibility to prepare for disposal in Finland and it also gave the time line for the milestones on the way to an operating disposal facility by 2020. The licensing procedure for a disposal facility has several steps that are similar to all nuclear facilities in Finland and are defined in Nuclear Energy Act and Decree (1987, 1988). These licensing steps are: - Decision-in-principle is required for a nuclear facility having considerable general significance. This is essentially a political decision: the government decides if the construction project is in line with the overall good of society. The decision can be applied for one or more sites, the host municipality has a veto right and the parliament has the choice of ratifying or not ratifying the decision. - Construction license is granted by the government and authorises the construction of the disposal facility. The actual construction is regulated by STUK and includes several review and approval steps, hold points and viewpoints. - Operational license is granted by the government and authorises the operation of the facility for a certain period. The operational license is needed before nuclear waste can be disposed. The first step in the licensing process was reached

  1. Republished: Fibrosing organising pneumonia.

    Science.gov (United States)

    Beardsley, Brooke; Rassl, Doris

    2014-08-01

    Organising pneumonia (otherwise referred to as bronchiolitis obliterans organising pneumonia) is characterised histologically by plugs of granulation tissue, which are present predominantly within small airways, alveolar ducts and peri-bronchiolar alveoli. This pattern is not specific for any disorder or cause, but is one type of inflammatory response to pulmonary injury, which may be seen in a wide variety of clinical conditions. Typically, organising pneumonia responds very well to corticosteroid treatment; however, a small percentage of patients appear to develop progressive fibrosis. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  2. Safety evaluation review of the prototype license application safety analysis report

    International Nuclear Information System (INIS)

    1991-08-01

    The US Nuclear Regulatory Commission (NRC) staff and consultants reviewed a Prototype License Application Safety Analysis Report (PLASAR) submitted by the US Department of Energy (DOE) for the belowground vault (BGV) alternative method of low-level radioactive waste disposal. In Volume 1 of NUREG-1375, the NRC staff provided the safety review results for an earth-mounded concrete bunker PLASAR. In the current report, the staff focused its review on the design, construction, and operational aspects of the BGV PLASAR. The staff developed review comments and questions using the Standard Review Plan (SRP), Rev. 1 (NUREG-1200) as the basis for evaluating the acceptability of the information provided in the BGV PLASAR. The detailed review comments provided in this report are intended to be useful guidance to facility developers and State regulators in addressing issues likely to be encountered in the review of a license application for a low-level-waste disposal facility. 44 refs

  3. A model to enable indirect manufacturing options transactions between organisations: An application to the ceramic industry

    International Nuclear Information System (INIS)

    Rodriguez-Rodriguez, R.; Gomez-Gasquet, P.; Oltra-Badenes, R. F.

    2014-01-01

    In the current competitive contexts, it is widely accepted and proved that inter-enterprise collaboration lead in many occasions to better results. The Spanish ceramic industry must improve, dropping its manufacturing costs in order to be able to compete with low cost products coming from Asia. In this sense, this work presents the main results obtained from applying an innovative model, which facilitates the transfer of manufacturing options between two ceramic enterprises that share a common supplier in the scenario where one of them needs more manufacturing capacity than the one booked according to its demand forecast and the another need less. Then, some decisional mechanisms are applied, which output the values for certain parameters in order to augment the benefit of all the three participants. With the application of this model better organisational results both economic and of service level are achieved. (Author)

  4. Palo Verde Generating Station, Units 4 and 5. License application, general information

    International Nuclear Information System (INIS)

    1978-01-01

    A license application for two more Palo Verde reactors, Units 4 and 5, is presented. The two PWR reactors have a nominal net generating power each of 1,270 MW(e). Containments are steel-lined prestressed cylindrical structures with hemispherical domes. The reactors are replicas of Palo Verde 1, 2 and 3 (see DOCKETS 50528, 50529 and 50530) using the standard Combustion Engineering System 80 (see DOCKET-STN-50470)

  5. Strategic Basis for License Application Planning for a Potential Yucca Mountain Repository

    International Nuclear Information System (INIS)

    Newberry, C. M.; Brocoum, S. J.; Gamble, R. P.; Murray, R. C.; Cline, M.

    2002-01-01

    If Yucca Mountain, Nevada is designated as the site for development of a geologic repository for disposal of spent nuclear fuel and high-level radioactive waste, the Department of Energy (DOE) must obtain Nuclear Regulatory Commission (NRC) approval first for repository construction, then for an operating license, and, eventually, for repository closure and decommissioning. The licensing criteria defined in Code of Federal Regulations, Title 10, Part 63 (10 CFR Part 63) establish the basis for these NRC decisions. Submittal of a license application (LA) to the NRC for authorization to construct a repository at the Yucca Mountain site is, at this point, only a potential future action by the DOE. The policy process defined in the Nuclear Waste Policy Act (NWPA), as amended, for recommendation and designation of Yucca Mountain as a repository site makes it difficult to predict whether or when the site might be designated. The DOE may only submit a LA to the NRC if the site designation takes effect. In spite of this uncertainty, the DOE must take prudent and appropriate action now, and over the next several years, to prepare for development and timely submittal of a LA. This is particularly true given the need for the DOE to develop, load, and certify the operation of its electronic information system to provide access to its relevant records as part of the licensing support network (LSN) in compliance with NRC requirements six months prior to LA submittal. The DOE must also develop a LA, which is a substantially different document from those developed to support a Site Recommendation (SR) decision. The LA must satisfy NRC licensing criteria and content requirements, and address the acceptance criteria defined by the NRC in its forthcoming Yucca Mountain Review Plan (YMRP). The content of the LA must be adequate to facilitate NRC acceptance and docketing for review, and the LA and its supporting documents must provide the documented basis for the NR C findings required

  6. Licensing an assured isolation facility for low-level radioactive waste. Volume 2: Recommendations on the content and review of an application

    Energy Technology Data Exchange (ETDEWEB)

    Silverman, D.J.; Bauser, M.A. [Morgan, Lewis and Bockius, Washington, DC (United States); Baird, R.D. [Rogers and Associates Engineering Corp., Salt Lake City, UT (United States)

    1998-07-01

    This report provides a detailed set of proposed criteria and guidance for the preparation of a license application for an assured isolation facility (AIF). The report is intended to provide a detailed planning basis upon which a prospective applicant may begin pre-licensing discussions with the Nuclear Regulatory Commission and initiate development of a license application. The report may also be useful to the NRC or to state regulatory agencies that may be asked to review such an application. Volume 1 of this report provides background information, and describes the licensing approach and methodology. Volume 2 identifies specific information that is recommended for inclusion in a license application.

  7. Licensing an assured isolation facility for low-level radioactive waste. Volume 2: Recommendations on the content and review of an application

    International Nuclear Information System (INIS)

    Silverman, D.J.; Bauser, M.A.; Baird, R.D.

    1998-07-01

    This report provides a detailed set of proposed criteria and guidance for the preparation of a license application for an assured isolation facility (AIF). The report is intended to provide a detailed planning basis upon which a prospective applicant may begin pre-licensing discussions with the Nuclear Regulatory Commission and initiate development of a license application. The report may also be useful to the NRC or to state regulatory agencies that may be asked to review such an application. Volume 1 of this report provides background information, and describes the licensing approach and methodology. Volume 2 identifies specific information that is recommended for inclusion in a license application

  8. How Employees' Perception of Information Technology Application and Their Knowledge Management Capacity Influence Organisational Performance

    Science.gov (United States)

    Kuo, Yen-Ku; Ye, Kung-Don

    2010-01-01

    This study investigates how workers' gender, work experience, designated division, and appointment affect (i) their perception of information technology (IT) within the organisation, (ii) their self-perceived capacity in knowledge management (KM), and (iii) their perception of organisational performance (OP). Furthermore, the study also examines…

  9. Development, assessment, licensing, and application of RELAP5YA at Yankee Atomic Electric Company

    International Nuclear Information System (INIS)

    Husain, A.

    1984-01-01

    Since 1975, Yankee Atomic Electric Company (YAEC) has been licensed to perform LOCA analyses (large and small breaks) for PWRs. The methods are based upon the WREM package, comprised of RELAP4-MOD 3, RELAP4-FLOOD, and TOODEE-2EM. Significant efforts were expended to compare WREM models against Appendix K criteria, and to incorporate changes for compliance with the criteria and for improved representation of LOCA phenomena. /SUP 2,3,4/ This internalized capability has been used extensively for licensing the Yankee and Maine Yankee plants, and for timely resolution of LOCA issues which frequently arose. The value of this internalized analysis capability was well recognized by the Yankee management. In 1979, Yankee embarked upon another LOCA Methods Development Program. One objective was to remove extra conservatisms inherent in older codes to provide additional operational flexibility for our plants. Also, we needed a code which could be used in a production mode to provide realistic response for off-normal conditions to be used in operator training and emergency guideline assessment. This program resulted in the development of RELAP5YA. The development, assessment, licensing, and application of RELAP5YA at YAEC is briefly described in this paper

  10. Sinonasal organised haematoma: clinical features and successful application of modified transnasal endoscopic medial maxillectomy.

    Science.gov (United States)

    Suzuki, M; Nakamura, Y; Ozaki, S; Yokota, M; Murakami, S

    2017-08-01

    Although organised haematoma often induces bone thinning and destruction similar to malignant diseases, the aetiology of organised haematoma and the optimal treatment remain unclear. This paper presents the clinical features of individuals with organised haematoma, and describes cases in which a novel modified approach was successfully applied for resection of organised haematoma in the maxillary sinus. Pre-operative examination data were evaluated retrospectively. Modified transnasal endoscopic medial maxillectomy was employed. Fourteen patients with organised haematoma were treated. Contrast-enhanced computed tomography showed heterogeneous enhancement in all patients. Eight patients underwent modified transnasal endoscopic medial maxillectomy, without complications such as facial numbness, tooth numbness, facial tingling, lacrimation and eye discharge. Dissection of the apertura piriformis and anterior maxillary wall was not necessary for any of these eight patients. No recurrence was observed. Pre-operative examinations can be helpful in determining the likelihood of organised haematoma. Modified transnasal endoscopic medial maxillectomy appears to be a safe and effective method for organised haematoma resection.

  11. Model tracking system for low-level radioactive waste disposal facilities: License application interrogatories and responses

    Energy Technology Data Exchange (ETDEWEB)

    Benbennick, M.E.; Broton, M.S.; Fuoto, J.S.; Novgrod, R.L.

    1994-08-01

    This report describes a model tracking system for a low-level radioactive waste (LLW) disposal facility license application. In particular, the model tracks interrogatories (questions, requests for information, comments) and responses. A set of requirements and desired features for the model tracking system was developed, including required structure and computer screens. Nine tracking systems were then reviewed against the model system requirements and only two were found to meet all requirements. Using Kepner-Tregoe decision analysis, a model tracking system was selected.

  12. Model tracking system for low-level radioactive waste disposal facilities: License application interrogatories and responses

    International Nuclear Information System (INIS)

    Benbennick, M.E.; Broton, M.S.; Fuoto, J.S.; Novgrod, R.L.

    1994-08-01

    This report describes a model tracking system for a low-level radioactive waste (LLW) disposal facility license application. In particular, the model tracks interrogatories (questions, requests for information, comments) and responses. A set of requirements and desired features for the model tracking system was developed, including required structure and computer screens. Nine tracking systems were then reviewed against the model system requirements and only two were found to meet all requirements. Using Kepner-Tregoe decision analysis, a model tracking system was selected

  13. Application of ASP Technology to Realize the Online Administrative License of the earthquake in Hunan Province

    Science.gov (United States)

    Tang, Hongliang; Kang, Chengxu; Tian, Youping

    2018-01-01

    Realizing the online handling of administrative approval of earthquakes is an important measure to improve work efficiency and facilitate people’s convenience. Based on the analysis of the characteristics and processes of the administrative licensing in the earthquake industry, this paper proposes an online processing model based on ASP technology and an online processing system based on B/S architecture. This paper presents the design and implementation methods. The application of the system shows that the system is simple in design and full in function, and can be used on mobile platforms such as computers and mobile phones, and has good practicability and forward-lookingness.

  14. 77 FR 23241 - Lock+ Hydro Friends Fund XXX, LLC; Notice of Intent To File License Application, Filing of Pre...

    Science.gov (United States)

    2012-04-18

    ... Friends Fund XXX, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document.... Date Filed: February 20, 2012. d. Submitted By: Lock+ Hydro Friends Fund XXX, LLC. e. Name of Project... Applicant Contact: Mr. Mark R. Stover, Lock+\\TM\\ Hydro Friends Fund XXX, c/o Hydro Green Energy, LLC, 900...

  15. 47 CFR 25.137 - Application requirements for earth stations operating with non-U.S. licensed space stations.

    Science.gov (United States)

    2010-10-01

    ... space stations. (a) Earth station applicants or entities filing a “letter of intent” or “Petition for... Union. (d) Earth station applicants requesting authority to operate with a non-U.S.-licensed space... 47 Telecommunication 2 2010-10-01 2010-10-01 false Application requirements for earth stations...

  16. Nuclear Measurements, Evaluations and Applications (NEMEA-7) Collaborative International Evaluated Library Organisation (CIELO). Workshop Proceedings

    International Nuclear Information System (INIS)

    Chadwick, Mark; Plompen, Arjan; ); Emmeric Dupont; )

    2014-01-01

    The 7. workshop on Nuclear Measurements, Evaluations and Applications (NEMEA) focused on international collaboration in nuclear data by hosting the kick-off meeting of the pilot project of the Collaborative International Evaluated Library Organisation (CIELO). CIELO aims at fostering nuclear data advances by using the joint expertise of the nuclear data community under the auspices of the OECD Nuclear Energy Agency. The workshop aimed at status reviews of planned and completed contributions and related developments for the CIELO pilot isotopes. The workshop further sought to facilitate in-depth discussions on nuclear data issues which are being addressed in the framework of European Commission projects like ERINDA, EUFRAT, ANDES and CHANDA. The 7. workshop on Nuclear Measurements, Evaluations and Applications (NEMEA) provided an opportunity for the Collaborative International Evaluated Library Organisation (CIELO) to meet and advance its objectives to improve our understanding of neutron reactions on key isotopes that are especially important in nuclear applications, especially in the area of criticality safety and reactors. CIELO is focusing initially on six nuclides ( 1 H, 16 O, 56 Fe, 235 U, 238 U and 239 Pu). These nuclides are important in the aforementioned applications, and despite decades of work many open questions remain to be solved. In some cases, the existing evaluations need improvement because the underlying experimental measurements are either lacking or contradictory. In other cases, nuclear theory work is needed to better advance predictions. In yet other cases, information from cross-section measurements is proving difficult to reconcile with information from integral nuclear criticality experiments or neutron shielding experiments. The main challenges to be faced are as follows: For oxygen, new work is needed to better define the total and elastic cross-sections at lower energies and neutron scattering angular distributions. An outstanding

  17. Product Life Cycle concept use and application by marketing decision-makers in small South African organisations

    Directory of Open Access Journals (Sweden)

    F. J. Herbst

    2003-12-01

    Full Text Available The purpose of the study was to test the underlying theory of the product life cycle concept with the primary objective of establishing what the use and practical value of the product life cycle concept is in making marketing decisions in small manufacturing and dealer organisations in Gauteng. The main focus was to test the ability of marketing decision-makers in these small organisations to associate their application and use of the product life cycle concept with Kotler's assumptions on marketing characteristics, described marketing objectives and proposed marketing strategies. A major finding was that small organisations tended to display a marketing knowledge level with the existing marketing theory. Another important conclusion of the study was that the current product life cycle concept theory needs to be broadened to include strategies on the expanded marketing mix. Apart from the different use and application by marketing decision-makers in small organisations in South Africa the product life cycle concept theory has potential as a strategic tool and a high likelihood for its future use as a marketing decision-making instrument.

  18. Review process for low-level radioactive waste disposal license application under Low-Level Radioactive Waste Policy Amendments Act

    International Nuclear Information System (INIS)

    Pittiglio, C.L. Jr.

    1987-08-01

    This document estimates the level of effort and expertise that is needed to review a license application within the required time. It is intended to be used by the NRC staff as well as States and interested parties to provide a better understanding of what the NRC envisions will be involved in licensing a low-level radioactive waste disposal facility. 5 refs., 3 figs., 1 tab

  19. The post-closure radiological safety case for a spent fuel repository in Sweden - An international peer review of the SKB license-application study of March 2011

    International Nuclear Information System (INIS)

    2012-01-01

    Sweden is at the forefront among countries developing plans for a deep geological repository of highly radioactive waste. There is no such repository in operation yet worldwide, but Sweden, Finland and France are approaching the licensing stage. At the request of the Swedish government, the NEA organised an international peer review of the post-closure radiological safety case produced by the Swedish Nuclear Fuel and Waste Management Company (SKB) in support of the application for a general licence to construct and operate a spent nuclear fuel geological repository in the municipality of Oesthammar. The purpose of the review was to help the Swedish government, the public and relevant organisations by providing an international reference regarding the maturity of SKB's spent fuel disposal programme vis-a-vis best practices in long-term disposal safety and radiological protection. The International Review Team (IRT) consisted of ten international specialists, who were free of conflict of interest with the SKB and brought complementary expertise to the review. This report provides the background and findings of the international peer review. The review's findings are presented at several levels of detail in order to be accessible to both specialist and non-specialist readers

  20. Preparing as an organization to review a construction license application for a DGR for HLW and SF in the USA

    International Nuclear Information System (INIS)

    Hill, Brittain

    2014-01-01

    Although formally opposed by the State of Nevada, the Yucca Mountain site (Nevada) recommendation was approved by the U.S. Congress and the President, which authorized DOE to prepare and submit a license application for a deep geologic repository for the nation's spent nuclear fuel and high-level waste. In June of 2008, DOE submitted this application to the U.S. Nuclear Regulatory Commission (NRC) for its review and formal adjudication of contested issues during a 3-4 year period. Although subsequent actions by the Administration and Congress have changed the direction for geologic disposal in the U.S., the NRC staff was able to conduct a thorough technical review of the DOE license application and issue technical evaluation reports before the review and hearings were suspended in September 2011. This paper provides the author's perspective on how the NRC prepared for, and conducted, this first-of-a-kind licensing review: planning framework, key preparations for staff and for processes, events after the receipt of a license application, retrospective on staff preparations and on processes. By the end of September 2011, the NRC staff had issued three Technical Evaluation Reports using a risk-informed, performance-based approach to review the DOE license application for this deep geologic repository at Yucca Mountain

  1. Organisational Structure

    Science.gov (United States)

    National Centre for Vocational Education Research (NCVER), 2006

    2006-01-01

    An understanding of organisational structure can provide guidance for organisations that want to change and innovate. Many writers agree that this understanding allows organisations to shape how their work is done to ultimately achieve their business goals--and that too often structure is given little consideration in business strategy and…

  2. 18 CFR 16.10 - Information to be provided by an applicant for new license: Filing requirements.

    Science.gov (United States)

    2010-04-01

    ... FEDERAL POWER ACT PROCEDURES RELATING TO TAKEOVER AND RELICENSING OF LICENSED PROJECTS Applications for... redistribution of power flows on line loading (with respect to applicable thermal, voltage, or stability limits... governmental agencies and subdivisions likely to be interested in or affected by the proposed expansion. (11...

  3. 75 FR 3261 - Powertech (USA) Inc.; Dewey-Burdock Project; New Source Material License Application; Notice of...

    Science.gov (United States)

    2010-01-20

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 40-9075; NRC-2009-0575] Powertech (USA) Inc.; Dewey... review process related to the Dewey- Burdock Uranium Project application, please contact the NRC... documents associated with the Dewey-Burdock Uranium Project, including the license application, are...

  4. 76 FR 40905 - Turnagain Arm Tidal Electric Energy Project; Notice of Intent To File License Application, Filing...

    Science.gov (United States)

    2011-07-12

    ... Tidal Electric Energy Project; Notice of Intent To File License Application, Filing of Pre-Application....: 13509-001. c. Dated Filed: May 11, 2011. d. Submitted By: Turnagain Arm Tidal Energy Corporation. e. Name of Project: Turnagain Arm Tidal Electric Energy Project. f. Location: Of the Upper Cook Inlet off...

  5. 77 FR 58370 - Pennamaquan Tidal Power LLC; Notice of Intent To File License Application, Filing of Pre...

    Science.gov (United States)

    2012-09-20

    ... Tidal Power LLC; Notice of Intent To File License Application, Filing of Pre-Application Document (PAD... Filed: July 19, 2012. d. Submitted By: Pennamaquan Tidal Power LLC (Pennamaquan Power). e. Name of Project: Pennamaquan Tidal Power Plant Project. f. Location: On the Pennamaquan River at the entrance to...

  6. 76 FR 81992 - PPL Bell Bend, LLC; Combined License Application for Bell Bend Nuclear Power Plant; Exemption

    Science.gov (United States)

    2011-12-29

    ... License Application for Bell Bend Nuclear Power Plant; Exemption 1.0 Background PPL Bell Bend, LLC... for Nuclear Power Plants.'' This reactor is to be identified as Bell Bend Nuclear Power Plant (BBNPP... based upon the U.S. EPR reference COL (RCOL) application for UniStar's Calvert Cliffs Nuclear Power...

  7. 75 FR 51451 - Erie Boulevard Hydropower, L.P.; Notice of Intent To File License Application, Filing of Pre...

    Science.gov (United States)

    2010-08-20

    ... Hydropower, L.P.; Notice of Intent To File License Application, Filing of Pre-Application Document, and.... Project No.: 7320-040. c. Dated Filed: June 29, 2010. d. Submitted By: Erie Boulevard Hydropower, L.P. e...: John Mudre at (202) 502-8902; or e-mail at [email protected] . j. Erie Boulevard Hydropower, L.P...

  8. Gibbs and Hill Standard Safety Analysis Report, GIBBSSAR. License application, volume 1: chapters 1--3 (section 7)

    International Nuclear Information System (INIS)

    1977-01-01

    License application for the GIBBSSAR Standard Plant is presented. The reactor used with the GIBBSSAR balance-of-plant system is the Westinghouse 3800 MW(t) PWR. This portion of the application includes a general plant description; site characteristics; and design of structures, components, equipment and systems

  9. Safety evaluation status report for the prototype license application safety analysis report

    International Nuclear Information System (INIS)

    1989-07-01

    The US Nuclear Regulatory Commission (NRC) staff and consultants reviewed a Prototype License Application Safety Analysis Report (PLASAR) submitted by the US Department of Energy (DOE) for the earth-mounded concrete bunker (EMCB) alternative method of low-level radioactive waste disposal. The NRC reviewers relied extensively on the Standard Review Plan (SRP), Rev.1 (NUREG-1200), to evaluate the acceptability of the information provided in the EMCB PLASAR. The NRC staff selected certain review areas in the PLASAR for development of safety evaluation report input to provide examples of safety assessments that are necessary as part of a licensing review. Because of the fictitious nature of the assumed disposal site, and the decision to limit the review to essentially first-round review status, the NRC staff report is labeled a ''Safety Evaluation Status Report'' (SESR). Appendix A comprises the NRC review comments and questions on the information that DOE submitted in the PLASAR. The NRC concentrated its review on the design and operations-related portions of the EMCB PLASAR

  10. Screening Analysis of Criticality Features, Events, and Processes for License Application

    International Nuclear Information System (INIS)

    J.A. McClure

    2004-01-01

    This report documents the screening analysis of postclosure criticality features, events, and processes. It addresses the probability of criticality events resulting from degradation processes as well as disruptive events (i.e., seismic, rock fall, and igneous). Probability evaluations are performed utilizing the configuration generator described in ''Configuration Generator Model'', a component of the methodology from ''Disposal Criticality Analysis Methodology Topical Report''. The total probability per package of criticality is compared against the regulatory probability criterion for inclusion of events established in 10 CFR 63.114(d) (consider only events that have at least one chance in 10,000 of occurring over 10,000 years). The total probability of criticality accounts for the evaluation of identified potential critical configurations of all baselined commercial and U.S. Department of Energy spent nuclear fuel waste form and waste package combinations, both internal and external to the waste packages. This criticality screening analysis utilizes available information for the 21-Pressurized Water Reactor Absorber Plate, 12-Pressurized Water Reactor Absorber Plate, 44-Boiling Water Reactor Absorber Plate, 24-Boiling Water Reactor Absorber Plate, and the 5-Defense High-Level Radioactive Waste/U.S. Department of Energy Short waste package types. Where defensible, assumptions have been made for the evaluation of the following waste package types in order to perform a complete criticality screening analysis: 21-Pressurized Water Reactor Control Rod, 5-Defense High-Level Radioactive Waste/U.S. Department of Energy Long, and 2-Multi-Canister Overpack/2-Defense High-Level Radioactive Waste package types. The inputs used to establish probabilities for this analysis report are based on information and data generated for the Total System Performance Assessment for the License Application, where available. This analysis report determines whether criticality is to be

  11. Organisational Art

    DEFF Research Database (Denmark)

    Ferro-Thomsen, Martin

    creation of a practical utopia (?heterotopia?) in the organisational context. The case study makes use of both art- and organisational theory. The thesis concludes with an outline of a framework for OA that is derived from contemporary theory of mainly Relational Aesthetics (Bourriaud), Conceptual Art......University of Copenhagen / Learning Lab Denmark. 2005 Kort beskrivelse: Organisational Art is a tentative title for an art form that works together with organisations to produce art. This is most often done together with non-artist members of the organisation and on-site in their social context. OA...... is characterised as socially engaged, conceptual, discursive, site-specific and contextual. Abstract: This investigation is about Organisational Art (OA), which is a tentative title for an art form that works together with organisations (companies, institutions, communities, governments and NGOs) to produce art...

  12. [Radiation protection in medical research : Licensing requirement for the use of radiation and advice for the application procedure].

    Science.gov (United States)

    Minkov, V; Klammer, H; Brix, G

    2017-07-01

    In Germany, persons who are to be exposed to radiation for medical research purposes are protected by a licensing requirement. However, there are considerable uncertainties on the part of the applicants as to whether licensing by the competent Federal Office for Radiation Protection is necessary, and regarding the choice of application procedure. The article provides explanatory notes and practical assistance for applicants and an outlook on the forthcoming new regulations concerning the law on radiation protection of persons in the field of medical research. Questions and typical mistakes in the application process were identified and evaluated. The qualified physicians involved in a study are responsible for deciding whether a license is required for the intended application of radiation. The decision can be guided by answering the key question whether the study participants would undergo the same exposures regarding type and extent if they had not taken part in the study. When physicians are still unsure about their decision, they can seek the advisory service provided by the professional medical societies. Certain groups of people are particularly protected through the prohibition or restriction of radiation exposure. A simplified licensing procedure is used for a proportion of diagnostic procedures involving radiation when all related requirements are met; otherwise, the regular licensing procedure should be used. The new radiation protection law, which will enter into force on the 31st of december 2018, provides a notification procedure in addition to deadlines for both the notification and the licensing procedures. In the article, the authors consider how eligible studies involving applications of radiation that are legally not admissible at present may be feasible in the future, while still ensuring a high protection level for study participants.

  13. Applicability of the Organisational Climate Description Questionnaire--Rutgers Elementary: A South African Case Study

    Science.gov (United States)

    Vos, D.; Ellis, S. M.; van der Westhuizen, Philip C.; Mentz, P. J.

    2013-01-01

    The Organisational Climate Description Questionnaire--Rutgers Elementary (OCDQ--RE) was used to determine the current organizational climate of primary schools in North-West Province, South Africa. This questionnaire evaluates the actions of principals and educators; the current organizational climate in primary schools can be determined from the…

  14. Current regulatory and licensing status for byproduct sources, facilities and applications

    International Nuclear Information System (INIS)

    Tingey, G.L.; Jensen, G.A.; Hazelton, R.F.

    1985-02-01

    Public use of nuclear byproducts, especially radioactive isotopes, will require approval by various regulatory agencies. Use of cesium-137 as an irradiation source for sterilizing medical products will require US Nuclear Regulatory Commission (NRC) approval. Two applications have been filed with NRC, and approval is expected soon. Widespread use of irradiation for food products depends on a favorable ruling by the Food and Drug Administration (FDA). A ruling is pending that would permit irradiation of fruits and vegetables up to 100 krad. NRC also controls the use of isotopes in remote power generators, but little regulatory action has been required in recent years. Recent development of radioluminescent (RL) lighting for runway lights has led to interest by commercial manufacturers. At the present time, a license has been issued to at least one manufacturer for sale of tritium-powered runway lights. 28 refs., 1 fig

  15. Patenting of university and non-university public research organisations in Germany: evidence from patent applications for medical research results.

    Directory of Open Access Journals (Sweden)

    Peter Tinnemann

    Full Text Available BACKGROUND: Patents are one of the most important forms of intellectual property. They grant a time-limited exclusivity on the use of an invention allowing the recuperation of research costs. The use of patents is fiercely debated for medical innovation and especially controversial for publicly funded research, where the patent holder is an institution accountable to public interest. Despite this controversy, for the situation in Germany almost no empirical information exists. The purpose of this study is to examine the amount, types and trends of patent applications for health products submitted by German public research organisations. METHODS/PRINCIPAL FINDINGS: We conducted a systematic search for patent documents using the publicly accessible database search interface of the German Patent and Trademark Office. We defined keywords and search criteria and developed search patterns for the database request. We retrieved documents with application date between 1988 and 2006 and processed the collected data stepwise to compile the most relevant documents in patent families for further analysis. We developed a rationale and present individual steps of a systematic method to request and process patent data from a publicly accessible database. We retrieved and processed 10194 patent documents. Out of these, we identified 1772 relevant patent families, applied for by 193 different universities and non-university public research organisations. 827 (47% of these patent families contained granted patents. The number of patent applications submitted by universities and university-affiliated institutions more than tripled since the introduction of legal reforms in 2002, constituting almost half of all patent applications and accounting for most of the post-reform increase. Patenting of most non-university public research organisations remained stable. CONCLUSIONS: We search, process and analyse patent applications from publicly accessible databases

  16. Nuclear Regulatory Commission staff development of the license application review plan for a high-level radioactive waste repository

    International Nuclear Information System (INIS)

    Johnson, R.L.; Holonich, J.J.; Lee, M.P.; Delligatti, M.S.

    1993-01-01

    The Nuclear Regulatory Commission staff has recently started a new initiative to develop the License Application Review Plan (LARP) which the staff will use in its reviews of the U.S. Department of Energy's (DOE's) license application (LA) for a geologic repository for the disposal of high-level radioactive waste (HLW). This paper describes the staff's approach for developing the LARP, the development schedule and current status, the organization and content of the LARP, and the staff's LA review strategy. Therefore, it gives a preview of the draft LARP which will be made available in late 1993. It also describes how the LARP will be used as guidance to the staff in conducting reviews of regulatory and technical issues important to the licensing of a geologic repository. Finally, the benefits to the NRC staff, DOE, and other parties are discussed

  17. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1987-05-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes

  18. Evaluation of the impact of intervention programmes on education organisations: Application to a Quality Management System.

    Science.gov (United States)

    Fernández-Díaz, Mª Jose; Rodríguez-Mantilla, Jesús Miguel; Jover-Olmeda, Gonzalo

    2017-08-01

    This paper analyses the importance of evaluating the various components of the programmes or actions carried out by education organisations. It highlights the need to assess the impact of the intervention on the organisation and consider how changes are consolidated over time in interaction with the context. We propose an impact evaluation model and as an example have chosen the implementation of Quality Management Systems in schools. The paper analyses the results obtained in 40 schools in three regions (Spanish Autonomous Communities) with varying levels of implementation. The results show overall impact on these education centres as the teachers and management teams of the centres perceive it. This impact is more evident in some of the dimensions considered in the study than in others. The results also confirm the differences between regional contexts. Copyright © 2017 Elsevier Ltd. All rights reserved.

  19. Applicability of IBAMA normative instruction 146-2007 to pipeline environmental licensing

    Energy Technology Data Exchange (ETDEWEB)

    Basbaum, Marcos A.; Fonseca, Renata A.A. [Servicos de Engenharia Emilio Baumgart Ltda. (SEEBLA), Rio de Janeiro, RJ(Brazil)], e-mail: mbasbaum.seebla@petrobras.com.br, e-mail: renataamorim.seebla@petrobras.com.br; Torggler, Bianca F.; Fernandes, Renato; Guimaraes, Ricardo Z.P. [Petroleo do Brasil S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil)], e-mail: torggler@petrobras.com.br, e-mail: renatofer@petrobras.com.br, e-mail: rzaluar@petrobras.com.br

    2009-07-01

    PETROBRAS has been conducting several wildlife programs in response to environmental licensing requirements from IBAMA (Brazilian environmental agency). Since 2007, IBAMA has been requiring the application of the Normative Instruction n. 146 (NI), which establishes criteria for wildlife management in the influence areas of new enterprises. However, experience from PETROBRAS has shown that many of the NI articles are not applicable to pipelines. Thus, a critical analysis of this NI was done based on data from company's wildlife programs. Our analysis indicated that the main NI items that do not apply to pipelines are: 1 - Animal rescue programs in deforested areas and selection of release areas, 2 - More than two fauna monitoring campaigns a year, 3 - Monitoring programs involving all groups of terrestrial vertebrates and also invertebrate classes. The non-applicability of these items is due to: 1 - The majority of pipelines are built in areas without significant native vegetation or with small fragments only, which are usually in secondary stage of ecological succession. Most pipelines scarcely involve removal of primary vegetation, 2 - Pipelines have an influence area restricted to a range of 800 m and the construction directly affects only strips from 20 m to 30 m, 3 - The most relevant impacts associated with pipelines are temporary, and do not persist during their operation. (author)

  20. Proposal of organisation and ALARA procedures for maintenance site: application to replacement of steam generator

    International Nuclear Information System (INIS)

    Lochard, J.; Lefaure, C.

    1989-08-01

    This report proposes generic organization and ALARA procedures for preparing a maintenance site at a NPP. After a short description of the ALARA principle, it describes the proposition for French sites. They are grouped according to the following: motivation, organisation, means. They are illustrated by the example of steam generator replacement. Three special points concerning preparation of the site are developed: education; training of operators; review of the project

  1. An Application of the Functional Resonance Analysis Method (FRAM) to Risk Assessment of Organisational Change

    Energy Technology Data Exchange (ETDEWEB)

    Hollnagel, Erik [MINES ParisTech Crisis and Risk Research Centre (CRC), Sophia Antipolis Cedex (France)

    2012-11-15

    The objective of this study was to demonstrate an alternative approach to risk assessment of organisational changes, based on the principles of resilience engineering. The approach in question was the Functional Resonance Analysis Method (FRAM). Whereas established approaches focus on risks coming from failure or malfunctioning of components, alone or in combination, resilience engineering focuses on the common functions and processes that provide the basis for both successes and failures. Resilience engineering more precisely proposes that failures represent the flip side of the adaptations necessary to cope with the real world complexity rather than a failure of normal system functions and that a safety assessment therefore should focus on how functions are carried out rather than on how they may fail. The objective of this study was not to evaluate the current approach to risk assessment used by the organisation in question. The current approach has nevertheless been used as a frame of reference, but in a non-evaluative manner. The author has demonstrated through the selected case that FRAM can be used as an alternative approach to organizational changes. The report provides the reader with details to consider when making a decision on what analysis approach to use. The choice of which approach to use must reflect priorities and concerns of the organisation and the author makes no statement about which approach is better. It is clear that the choice of an analysis approach is not so simple to make and there are many things to take into account such as the larger working environment, organisational culture, regulatory requirements, etc.

  2. An Application of the Functional Resonance Analysis Method (FRAM) to Risk Assessment of Organisational Change

    International Nuclear Information System (INIS)

    Hollnagel, Erik

    2012-11-01

    The objective of this study was to demonstrate an alternative approach to risk assessment of organisational changes, based on the principles of resilience engineering. The approach in question was the Functional Resonance Analysis Method (FRAM). Whereas established approaches focus on risks coming from failure or malfunctioning of components, alone or in combination, resilience engineering focuses on the common functions and processes that provide the basis for both successes and failures. Resilience engineering more precisely proposes that failures represent the flip side of the adaptations necessary to cope with the real world complexity rather than a failure of normal system functions and that a safety assessment therefore should focus on how functions are carried out rather than on how they may fail. The objective of this study was not to evaluate the current approach to risk assessment used by the organisation in question. The current approach has nevertheless been used as a frame of reference, but in a non-evaluative manner. The author has demonstrated through the selected case that FRAM can be used as an alternative approach to organizational changes. The report provides the reader with details to consider when making a decision on what analysis approach to use. The choice of which approach to use must reflect priorities and concerns of the organisation and the author makes no statement about which approach is better. It is clear that the choice of an analysis approach is not so simple to make and there are many things to take into account such as the larger working environment, organisational culture, regulatory requirements, etc

  3. Licensing issues

    International Nuclear Information System (INIS)

    Roberts, J.P.; Desell, L.J.; Birch, M.L.; Berkowitz, L.; Bader, J.F.

    1992-01-01

    To provide guidance for the Department of Energy's (DOE) Civilian Radioactive Waste Management Program, the Nuclear Regulatory Commission (NRC) has issued a draft regulatory guide on the Format and Content for the License Application for the High-Level Waste Repository (FCRG). To facilitate the development of the FCRG, NRC suggested that DOE use the draft guide as the basis for preparing an annotated outline for a license application. DOE is doing so using an iterative process called the Annotated Outline Initiative. DOE;s use of the Initiative will assist in achieving the desired incorporation of actual experience in the FCRG, contribute to the development of shared interpretation and understanding of NRC regulations, and provide other important programmatic benefits described in this paper

  4. Automation of the DoD Export License Application Review Process

    National Research Council Canada - National Science Library

    Young, Shelton

    2002-01-01

    .... The overall audit objective was to determine whether Federal automation programs supporting the export license and review process could be used to establish a common electronic interface creating...

  5. 78 FR 30914 - Grand River Dam Authority Notice of Application for Temporary Variance of License and Soliciting...

    Science.gov (United States)

    2013-05-23

    .... Description of Request: Grand River Dam Authority (GRDA) requests a temporary variance, for the year 2013, to... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1494-416] Grand River Dam Authority Notice of Application for Temporary Variance of License and Soliciting Comments, Motions To...

  6. 77 FR 39675 - Applications for Licensing as a Non-Leveraged Rural Business Investment Company Under the Rural...

    Science.gov (United States)

    2012-07-05

    ... large 3-ring binder. Label the binders with the RBIC's name. Submit one complete and unbound one-sided hard copy of the MAQ and Exhibits suitable for photocopying (i.e., no hole punches, staples, paper clips, tabs or binders). Applicants must enclose in their submission a nonrefundable licensing fee of...

  7. 78 FR 4467 - UniStar Nuclear Energy, Combined License Application for Calvert Cliffs Power Plant, Unit 3...

    Science.gov (United States)

    2013-01-22

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 52-016; NRC-2008-0250] UniStar Nuclear Energy, Combined License Application for Calvert Cliffs Power Plant, Unit 3, Exemption 1.0 Background UniStar Nuclear Energy (UNE), on behalf of Calvert Cliffs Nuclear Project, LLC and UniStar Nuclear Operating Services...

  8. 76 FR 81994 - UniStar Nuclear Energy; Combined License Application for Calvert Cliffs Nuclear Power Plant, Unit...

    Science.gov (United States)

    2011-12-29

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 52-016; NRC-2008-0250] UniStar Nuclear Energy; Combined License Application for Calvert Cliffs Nuclear Power Plant, Unit 3; Exemption 1.0 Background: UniStar Nuclear Energy (UNE) submitted to the U.S. Nuclear Regulatory Commission (NRC or the Commission ) a...

  9. 76 FR 11522 - In the Matter of Progress Energy Florida, Inc. (Combined License Application, Levy County Nuclear...

    Science.gov (United States)

    2011-03-02

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 52-029-COL, 52-030-COL] In the Matter of Progress Energy Florida, Inc. (Combined License Application, Levy County Nuclear Power Plant, Units 1 and 2... by the Nuclear Regulatory Commission staff in this case. Mr. Dehmel has not previously performed any...

  10. 75 FR 69063 - Port Bailey Wild Enterprises, LLC; PB Energy, Inc.; Notice of Application for Transfer of License...

    Science.gov (United States)

    2010-11-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1432-010] Port Bailey Wild... Motions To Intervene November 3, 2010. On October 22, 2010, Port Bailey Wild Enterprises, LLC (transferor) and PB Energy, Inc. (transferee) filed a joint application for transfer of license for the Dry Spruce...

  11. 78 FR 61984 - Copper Valley Electric Association, Inc.; Notice of Application To Amend License and Accepted for...

    Science.gov (United States)

    2013-10-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13124-005] Copper Valley...: Amendment to License. b. Project No: 13124-005. c. Date Filed: September 27, 2013. d. Applicant: Copper..., Copper Valley Electric Association, Inc., P.O. Box 45, Mile 187 Glenn Highway, Glennallen, AK 99588, (907...

  12. 78 FR 14528 - Mayo Hydropower, LLC, Avalon Hydropower, LLC; Notice of Application for Transfer of License, and...

    Science.gov (United States)

    2013-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11169-029] Mayo Hydropower, LLC, Avalon Hydropower, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On November 20, 2012, Mayo Hydropower, LLC (transferor) and Avalon Hydropower...

  13. 78 FR 5196 - Notice of Invitation To Participate; Exploration for Coal in Colorado License Application COC-75642

    Science.gov (United States)

    2013-01-24

    ...] Notice of Invitation To Participate; Exploration for Coal in Colorado License Application COC-75642... Mineral Leasing Act of 1920, as amended by the Federal Coal Leasing Amendments Act of 1976, and to Bureau..., Colorado. DATES: Any party electing to participate in this exploration program must send written notice to...

  14. 76 FR 55701 - Notice of Invitation to Participate; Exploration for Coal in Colorado License Application COC-74895

    Science.gov (United States)

    2011-09-08

    ...] Notice of Invitation to Participate; Exploration for Coal in Colorado License Application COC-74895... Mineral Leasing Act of 1920, as amended by the Federal Coal Leasing Amendments Act of 1976, and to Bureau... coal deposits owned by the United States of America in lands located in Routt County, Colorado. DATES...

  15. Application of the New Decommissioning Regulation to the Nuclear Licensed Facilities (NLF) at Fontenay-aux-Roses's Nuclear Center (CEA)

    International Nuclear Information System (INIS)

    Sauret, Josiane; Piketty, Laurence; Jeanjacques, Michel

    2008-01-01

    This abstract describes the application of the new decommissioning regulation on all Nuclear Licensed Facilities (NLF is to say INB in French) at Fontenay-aux-Roses's Center (CEA/FAR). The decommissioning process has been applied in six buildings which are out of the new nuclear perimeter proposed (buildings no 7, no 40, no 94, no 39, no 52/1 and no 32) and three buildings have been reorganized (no 54, no 91 and no 53 instead of no 40 and no 94) in order to increase the space for temporary nuclear waste disposal and to reduce the internal transports of nuclear waste on the site. The advantages are the safety and radioprotection improvements and a lower operating cost. A global safety file was written in 2002 and 2003 and was sent to the French Nuclear Authority on November 2003. The list of documents required is given in the paragraph I of this paper. The main goals were two ministerial decrees (one decree for each NLF) getting the authorization to modify the NLF perimeter and to carry out cleaning and dismantling activities leading to the whole decommissioning of all NLF. Some specific authorizations were necessary to carry out the dismantling program during the decommissioning procedure. They were delivered by the French Nuclear Safety Authority (FNSA) or with limited delegation by the General Executive Director (GED) on the CEA Fontenay-aux-Roses's Center, called internal authorization. Some partial dismantling or decontamination examples are given below: - evaporator for the radioactive liquid waste treatment station (building no 53): FNSA authorization: phase realised in 2002/2003. - disposal tanks for the radioactive liquid waste treatment station (building no 53) FNSA authorization: phase realised in 2004, - incinerator for the radioactive solid waste treatment station (building no 07): FNSA authorization: operation realised in 2004, - research equipments in the building no. 54 and building no. 91: internal authorization ; realised in 2005, - sample

  16. Applications of Self-Organising Map (SOM) for prioritisation of endemic zones of filariasis in Andhra Pradesh, India.

    Science.gov (United States)

    Murty, Upadhayula Suryanaryana; Rao, Mutheneni Srinivasa; Sriram, K; Rao, K Madhusudhan

    2011-01-01

    Entomological and epidemiological data of Lymphatic Filariasis (LF) was collected from 120 villages of four districts of Andhra Pradesh, India. Self-Organising Maps (SOMs), data-mining techniques, was used to classify and prioritise the endemic zones of filariasis. The results show that, SOMs classified all the villages into three major clusters by considering the data of Microfilaria (MF) rate, infection, infectivity rate and Per Man Hour (PMH). By considering the patterns of cluster, appropriate decision can be drawn for each parameter that is responsible for disease transmission of filariasis. Hence, SOM will certainly be a suitable tool for management of filariasis. The detailed application of SOM is discussed in this paper.

  17. Workshop on Regulatory Review and Safety Assessment Issues in Repository Licensing

    International Nuclear Information System (INIS)

    Wilmot, Roger D.

    2011-02-01

    The workshop described here was organised to address more general issues regarding regulatory review of SKB's safety assessment and overall review strategy. The objectives of the workshop were: - to learn from other programmes' experiences on planning and review of a license application for a nuclear waste repository, - to offer newly employed SSM staff an opportunity to learn more about selected safety assessment issues, and - to identify and document recommendations and ideas for SSM's further planning of the licensing review

  18. Standard format and content for the physical protection section of a license application (for facilities other than nuclear power plants)

    International Nuclear Information System (INIS)

    1976-06-01

    The document presented has been prepared as an aid to uniformity and completeness in the preparation and review of the physical protection section of license applications. It is applicable to fuel reprocessing plants, fuel manufacturing plants, SNM tranportation, or other special nuclear material operations involving the possession and use of uranium 235 (contained in uranium enriched to 20 percent or more in the U-235 isotope), uranium 233, or plutonium alone or in any combination in a quantity of 5000 grams or more computed by the formula: grams = (grams contained U-235) + 2.5 (grams U-233 + grams plutonium). The document is not intended to be used for nuclear power plants. The information specified is the minimum needed for a license application. Additional information may be required for completion of the staff review of a particular application

  19. 47 CFR 97.21 - Application for a modified or renewed license grant.

    Science.gov (United States)

    2010-10-01

    ... name, club name, license trustee name or license custodian name in accordance with § 1.913 of this... form to a Club Station Call Sign Administrator who must submit the information thereon to the FCC in an electronic batch file. The Club Station Call Sign Administrator must retain the collected information for at...

  20. Safety case for license application for a final repository: The French example

    International Nuclear Information System (INIS)

    Boissier, Fabrice; Voinis, Sylvie

    2014-01-01

    The reversible repository in a deep geological formation is the French reference solution for the long-term management of high-level and intermediate-level long-lived radioactive waste (HLW and ILW). Twenty years of R and D work and conceptual and basic studies since the first French Act of 1991 led, in particular, to a feasibility demonstration in 2005. According to the French Act on Radioactive Waste of 28 of June 2006, Andra shall design a reversible repository in order to apply for license in 2015. In response to this demand, Andra developed the industrial project known as 'Cigeo', a reversible geological disposal facility for HLW and ILW located in Meuse/Haute-Marne. Two years before applying for authorisation, Andra's project is now focusing on three main targets: developing Cigeo's industrial design, preparing the authorisation process through increased exchanges with stakeholders and the preparation of a safety case to support authorisation application. The latter draws on the previous safety cases of 2005 and 2009, which give a sound basis to assess Cigeo's safety, both for the operational and post-closure periods. In this new stage of the project, the challenging issues for the preparation of the safety case are the following: - to identify the various regulatory frameworks (nuclear and non-nuclear) and guides applicable to the facility; - to ensure that the industrial design complies in particular with the safety requirements as presented in the safety case and its supporting safety assessment; - to identify crucial inputs (R and D, tests,...) needed to support the authorisation application, in particular, to bring convincing arguments to assess the technical feasibility of the design and when appropriate its ability to meet the safety requirements; - to ensure that all the requirements from previous regulatory and peer reviews (national and international?) are taken into account. (authors)

  1. Development of RESRAD probabilistic computer codes for NRC decommissioning and license termination applications

    International Nuclear Information System (INIS)

    Chen, S. Y.; Yu, C.; Mo, T.; Trottier, C.

    2000-01-01

    In 1999, the US Nuclear Regulatory Commission (NRC) tasked Argonne National Laboratory to modify the existing RESRAD and RESRAD-BUILD codes to perform probabilistic, site-specific dose analysis for use with the NRC's Standard Review Plan for demonstrating compliance with the license termination rule. The RESRAD codes have been developed by Argonne to support the US Department of Energy's (DOEs) cleanup efforts. Through more than a decade of application, the codes already have established a large user base in the nation and a rigorous QA support. The primary objectives of the NRC task are to: (1) extend the codes' capabilities to include probabilistic analysis, and (2) develop parameter distribution functions and perform probabilistic analysis with the codes. The new codes also contain user-friendly features specially designed with graphic-user interface. In October 2000, the revised RESRAD (version 6.0) and RESRAD-BUILD (version 3.0), together with the user's guide and relevant parameter information, have been developed and are made available to the general public via the Internet for use

  2. Qualification of the coupled RELAP5/PANTHER/COBRA code package for licensing applications

    International Nuclear Information System (INIS)

    Schneidesch, C.R.; Zhang Jinzhao

    2004-01-01

    A coupled thermal hydraulics-neutronics code package has been developed at Tractebel Engineering (TE), in which the best-estimate thermal-hydraulic system code, RELAP5/mod2.5, is coupled with the full three-dimensional reactor core kinetics code, PANTHER, via the dynamic data exchange interface, TALINK. The Departure from Nucleate Boiling Ratio (DNBR) is calculated by the sub-channel thermal-hydraulic analysis code COBRA-3C. The package provides the capability to accurately simulate the key physical phenomena in nuclear power plant accidents with strong asymmetric behaviours and system-core interactions. This paper presents the TE coupled code package and focuses on the methodology followed for qualifying it for licensing applications. The qualification of the coupling demonstrated the robustness achieved by the combined 3-D neutron kinetics/system T-H code package for transient simulations. The coupled TE code package has been qualified and will be used at Tractebel Engineering (TE) for analyzing asymmetric PWR accidents with strong core-system interactions

  3. Logo-od: The applicability of Logotherapy as an organisation development intervention

    Directory of Open Access Journals (Sweden)

    Daniel H. Burger

    2008-11-01

    Full Text Available the study investigated the relationship between “resistance to or readiness for change” (ror-change and “meaning seeking”, and whether a logotherapy-based intervention – Logo-OD – would impact on resistance to change. A quasi-experimental design and various statistical procedures were applied to test formulated hypotheses. of a survey population of 1 637 individuals, 193 and 76 respondents formed part of the pre- and post-test samples respectively. Whereas a signifcant relationship was established between said constructs, no signifcant effect of Logo-OD was observed. These results supported the primary conclusions emanating from the literature: the role of logo-oD is one of a positive trigger event for organisational change.

  4. Organising integration

    DEFF Research Database (Denmark)

    Axelsson, Runo

    2013-01-01

    Background: In Sweden, as in many other countries, there has been a succession of trends in the organisation of health care and other welfare services. These trends have had different implications for the integration of services in the health and welfare system. Aims: One aim is to discuss...... the implications of different organisational trends for the integration of health and welfare services. Another aim is to introduce a Swedish model of financial coordination as a flexible way to organise integration. Organisational trends: In the 1960’s there was an expansion of health and welfare services leading...... an increasing lack of integration in the health and welfare system. In the 2000’s, there has been a re-centralisation through mergers of hospitals, regions and state agencies. It has become clear, however, that mergers do not promote integration but rather increase the bureaucratisation of the system. Model...

  5. Organisational LCA

    DEFF Research Database (Denmark)

    Martínez-Blanco, Julia; Finkbeiner, Matthias

    2018-01-01

    environmental performance over time, supporting strategic decisions, and informing corporate sustainability reporting. Several initiatives are on the way for the LCA of organisations: the UNEP/SETAC Life Cycle Initiative published the ‘Guidance on organizational LCA’, using ISO/TS 14072 as a backbone; moreover......, when the unit of analysis and the system boundaries are defined. Also, the approach for data collection needs to be fixed. Organisational LCA is a compilation and evaluation of the inputs, outputs and potential environmental impacts of the activities associated with the organisation adopting a life...... cycle perspective. It includes not only the facilities of the organisation itself, but also the activities upstream and downstream the value chain. This methodology is capable of serving multiple goals at the same time, like identifying environmental hotspots throughout the value chain, tracking...

  6. Organisation Matters

    DEFF Research Database (Denmark)

    Unphon, Hataichanok; Dittrich, Yvonne

    2008-01-01

    Our work aims at understanding the design rationale for product line architecture by focusing on the design of common data access modules for complex simulation software products. This paper presents empirical evidence of organisational and business domain aspects that influence the development...... of product line architecture. We suggest that the assessment of use-situation and his tory of organisational structure should be considered when creating product line architectures, especially for products that are tailored and used interactively....

  7. 75 FR 23808 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2010-05-04

    ... most adverse moderation conditions feasible by unborated water. By meeting this criteria, the removal... Risk Assessment in Risk-Informed Decisions On Plant-Specific Changes to the Licensing Basis,'' and RG 1...

  8. 76 FR 77565 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2011-12-13

    ... intervene shall be filed in accordance with the Commission's ''Rules of Practice for Domestic Licensing...- conservative emergency diesel generator fuel oil supply volumes, incorporate portions of Technical... of the associated Technical Specifications to require an adequate emergency diesel generator and...

  9. NUPLEX Licensing Subcommittee

    International Nuclear Information System (INIS)

    Edwards, D.W.; Allen, S.R.

    1988-01-01

    The NUPLEX Licensing Subcommittee was organized to seek a formal license renewal mechanism that institutionalizes the current licensing basis and consequent level of safety of a plant as the legitimate standard for acceptance and approval of an application for extended operation. Along with defining the most workable approach to and scope of review for license renewal, this paper explains the reasons why a regulatory framework is needed by the early 1990s. The initial results of development work on two key issues, licensing criteria and hearing process, are also presented. at this point six potential license renewal criteria have emerged: evaluation of existing monitoring/maintenance programs, revalidation of current licensing basis, conformance to special regulations, evaluation to a safety goal, plant performance history, and environmental assessment. The work on a hearing process has led to the development of two models for future consideration: hybrid legislative and hybrid adjudicatory

  10. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1993-01-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes

  11. Composable local memory organisation for streaming applications on embedded MPSoCs

    NARCIS (Netherlands)

    Ambrose, J.; Molnos, A.; Nelson, A.; Cotofana, S.; Goossens, K.G.W.; Juurlink, B.

    2011-01-01

    Multi-Processor Systems on a Chip (MPSoCs) are suitable platforms for the implementation of complex embedded applications. An MPSoC is composable if the functional and temporal behaviour of each application is independent of the absence or presence of other applications. Composability is required

  12. 75 FR 54330 - Intent To Grant an Exclusive Field of Use License of a U.S. Government-Owned Patent Application

    Science.gov (United States)

    2010-09-07

    ... DEPARTMENT OF DEFENSE Department of the Army Intent To Grant an Exclusive Field of Use License of a U.S. Government-Owned Patent Application AGENCY: Department of the Army, DoD. ACTION: Notice... intent to grant an exclusive, revocable license for the field of use in the research reagent market to...

  13. 75 FR 39668 - Intent To Grant a Field of Use Exclusive License of a U.S. Government-Owned Patent Application

    Science.gov (United States)

    2010-07-12

    ... DEPARTMENT OF DEFENSE Department of the Army Intent To Grant a Field of Use Exclusive License of a U.S. Government-Owned Patent Application AGENCY: Department of the Army, DoD. ACTION: Notice... intent to grant a field of use exclusive, revocable license for the field of shigella vaccine development...

  14. THE WAN-IFRA DISCOURSE: ADVICE, APPLICATION, AND DISQUALIFICATION OF ORGANISATIONAL MODELS IN MEDIA

    Directory of Open Access Journals (Sweden)

    Joël Langonné

    2014-06-01

    Full Text Available Among the multiple exhortations made on the liberating - even saviour-type - role of the digital era over the past ten years in the field of journalism, one constant has remained: criticism of managerial models and dialectic of economic ones in the media which have defined the spheres of action, resulting in these discourses without ever sealing their fate. A fate that for several years now has been marked by a process in which journalists are being cast aside in favour of a managerial standpoint that broadly integrates 'convergence' as a tool of governance. This paper aims to question (as one of many mediations instituting convergence as a structuring model WAN-IFRA's discursive and ideological materiality. This international organisation of newspapers and news publishers has set its sights on convincing the print media of the necessity to switching to multiformat; to convergence. This work investigates the stability and/or instability of the WAN-IFRA discourse, as well as its ability to absorb other discourses. Lastly, through a cloud of prescriptive discourse it will indicate those discourses enforced by some managers in the media business.

  15. The WAN-IFRA discourse: advice, application, and disqualification of organisational models in media

    Directory of Open Access Journals (Sweden)

    Joël Langonné

    2014-06-01

    Full Text Available Among the multiple exhortations made on the liberating - even saviour-type - role of the digital era over the past ten years in the field of journalism, one constant has remained: criticism of managerial models and dialectic of economic ones in the media which have defined the spheres of action, resulting in these discourses without ever sealing their fate. A fate that for several years now has been marked by a process in which journalists are being cast aside in favour of a managerial standpoint that broadly integrates 'convergence' as a tool of governance. This paper aims to question (as one of many mediations instituting convergence as a structuring model WAN-IFRA's discursive and ideological materiality. This international organisation of newspapers and news publishers has set its sights on convincing the print media of the necessity to switching to multiformat; to convergence. This work investigates the stability and/or instability of the WAN-IFRA discourse, as well as its ability to absorb other discourses. Lastly, through a cloud of prescriptive discourse it will indicate those discourses enforced by some managers in the media business.

  16. Virtual corporations, enterprise and organisation

    Directory of Open Access Journals (Sweden)

    Carmen RÃDUT

    2009-06-01

    Full Text Available Virtual organisation is a strategic paradigm that is centred on the use of information and ICT to create value. Virtual organisation is presented as a metamanagement strategy that has application in all value oriented organisations. Within the concept of Virtual organisation, the business model is an ICT based construct that bridges and integrates enterprise strategic and operational concerns. Firms try to ameliorate the impacts of risk and product complexity by forming alliances and partnerships with others to spread the risk of new products and new ventures and to increase organisational competence. The result is a networked virtual organization.

  17. Applicability of Item Response Theory to the Korean Nurses' Licensing Examination

    Directory of Open Access Journals (Sweden)

    Geum-Hee Jeong

    2005-06-01

    Full Text Available To test the applicability of item response theory (IRT to the Korean Nurses' Licensing Examination (KNLE, item analysis was performed after testing the unidimensionality and goodness-of-fit. The results were compared with those based on classical test theory. The results of the 330-item KNLE administered to 12,024 examinees in January 2004 were analyzed. Unidimensionality was tested using DETECT and the goodness-of-fit was tested using WINSTEPS for the Rasch model and Bilog-MG for the two-parameter logistic model. Item analysis and ability estimation were done using WINSTEPS. Using DETECT, Dmax ranged from 0.1 to 0.23 for each subject. The mean square value of the infit and outfit values of all items using WINSTEPS ranged from 0.1 to 1.5, except for one item in pediatric nursing, which scored 1.53. Of the 330 items, 218 (42.7% were misfit using the two-parameter logistic model of Bilog-MG. The correlation coefficients between the difficulty parameter using the Rasch model and the difficulty index from classical test theory ranged from 0.9039 to 0.9699. The correlation between the ability parameter using the Rasch model and the total score from classical test theory ranged from 0.9776 to 0.9984. Therefore, the results of the KNLE fit unidimensionality and goodness-of-fit for the Rasch model. The KNLE should be a good sample for analysis according to the IRT Rasch model, so further research using IRT is possible.

  18. The Organisation and Rationalisation of Java Based Applications in the BDI Group

    CERN Document Server

    Jackson, S; CERN. Geneva. AB Department

    2005-01-01

    The AB/BDI software section is responsible for providing all the software necessary to develop, test, diagnose and maintain the different instruments produced by the group. Almost all graphical user interface applications produced by the group are written in Java and the Java Web Start architecture is used to launch these applications. Java Web Start provides a solid basis for application deployment, but lacks several key features essential for ensuring a proper and easily manageable working environment. This note describes an internally developed tool, which extends the Java Web Start functionality in order to provide these missing features.

  19. Guide for the preparation of applications for special nuclear material licenses of less than critical mass quantities - July 1976

    International Nuclear Information System (INIS)

    Anon.

    1977-01-01

    This guide describes the type of information needed to evaluate an application for a specific license for receipt, possession, use, and transfer of special nuclear material. It is intended for applicants requesting authorization to possess and use up to 2000 grams of plutonium, total, in the form of sealed plutonium-beryllium neutron sources, and any special nuclear material in quantities and forms not sufficient to form a critical mass. The latter quantities are considered to be 350 grams of contained uranium-235, 200 grams of uranium-233, 200 grams of plutonium (in any form other than plutonium-beryllium neutron sources) or any combination of them

  20. Training organisation

    International Nuclear Information System (INIS)

    Andrlova, Z.

    2012-01-01

    Slovenske elektrarne considers a specific training and education of experienced experts to be a key issue. The company gradually undergoes quite demanding change in the field of education and training of the nuclear power plants staff. We have an ambitious vision - to create one of the best training organisations in Europe by the means of systematic approach to the training. (author)

  1. Barndommens organisering

    DEFF Research Database (Denmark)

    Barndommens Organisering undersøger og diskuterer dansk barndom som et samfundsmæssigt fænomen. Det er bogens mål at pege på en mangfoldighed af organiseringsprocesser, der på forskellig vis bidrager til at skabe barndommens rum, både de symbolske og de materielle. Bogens artikler er skrevet af...

  2. TEAM ORGANISERING

    DEFF Research Database (Denmark)

    Levisen, Vinie; Haugaard, Lena

    2004-01-01

    organisation som denne? Når teams i samtiden anses for at være en organisationsform, der fremmer organisatorisk læring, beror det på, at teamet antages at udgøre et ikke-hierarkisk arbejdsfællesskab, hvor erfaringer udveksles og problemer løses. Teamorganisering kan imidlertid udformes på mange forskellige...

  3. Learning organisations

    Directory of Open Access Journals (Sweden)

    Sabina Jelenc Krašovec

    2000-12-01

    Full Text Available A vast array of economical, social, political, cultural and other factors influences the transformed role of learning and education in the society, as well as the functioning of local community and its social and communication patterns. The influences which are manifested as global problems can only be successfully solved on the level of local community. Analogously with the society in general, there is a great need of transforming a local community into a learning, flexible and interconnected environment which takes into account different interests, wishes and needs regarding learning and being active. The fundamental answer to changes is the strategy of lifelong learning and education which requires reorganisation of all walks of life (work, free time, family, mass media, culture, sport, education and transforming of organisations into learning organisations. With learning society based on networks of knowledge individuals are turning into learning individuals, and organisations into learning organisations; people who learn take the responsibility of their progress, learning denotes partnership among learning people, teachers, parents, employers and local community, so that they work together to achieve better results.

  4. Organisational Change

    DEFF Research Database (Denmark)

    Poulsen, Peter

    the combined use of contingency theory, strategic choice theory and structuration theory. The intention is analyse whether one of the paradigms would emerge as “dominant”, i.e. produce superior explanation of organisational change, or if a multi-paradigmatic view would be more beneficial in understanding...

  5. 76 FR 52699 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2011-08-23

    ... proposes to credit the automatic trip of the main turbine upon the initiation of a manual reactor trip for... credited manual reactor trip action that is part of the current licensing basis. Considerable defense-in... more robust AREVA Advanced W17 high thermal performance (HTP) fuel at Sequoyah Nuclear Plant (SQN...

  6. 75 FR 61521 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2010-10-05

    ... revises the charcoal testing criteria in Technical Specification 5.5.9, ``Ventilation Filter Testing... staffing from two to four, allow in-plant protective actions to be performed by personnel assigned to other functions, and replace a Mechanical Maintenance person with a Non-Licensed Operator. Date of issuance...

  7. Guidance for the licensing procedure concerning the application of radiographic equipment

    International Nuclear Information System (INIS)

    1987-01-01

    According to article 4 of the Ordinance on the Implementation of Atomic Safety and Radiation Protection dated 11 October 1984 the operation of radiographic equipment has to be licensed. The personnel and material requirements that are to be fulfilled by a licensee prior to commissioning X-ray or gamma equipment, are discussed in detail

  8. 76 FR 73727 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2011-11-29

    ..., Donald C. Cook Nuclear Plant, Unit 2 (DCCNP-2), Berrien County, Michigan; Date of amendment request... Counsel, Indiana Michigan Power Company, One Cook Place, Bridgman, MI 49106. NRC Acting Branch Chief: Thomas J. Wengert. Notice of Issuance of Amendments to Facility Operating Licenses During the period...

  9. 76 FR 61391 - Biweekly Notice Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2011-10-04

    ... ''Rules of Practice for Domestic Licensing Proceedings'' in 10 CFR part 2. Interested person(s) should... to be operable in MODES 1, 2, and 3, as well as in MODE 4 when a steam generator (SG) is relied upon... stored diesel fuel oil inventory will require that a 7 day supply be available for each diesel generator...

  10. 76 FR 39136 - Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant...

    Science.gov (United States)

    2011-07-05

    ... the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10 CFR part 2. Interested... Generator (SG) Program,'' to exclude a portion of the tubes below the top of the steam generator tubesheet from periodic steam generator tube inspections during Refueling Outage 14 and the subsequent operating...

  11. 75 FR 37471 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2010-06-29

    ... accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10 CFR Part 2... Specifications (TSs) to extend the allowed outage time (AOT) for the ``A'' and ``B'' emergency diesel generators... emergency diesel generators are safety related components which provide backup electrical power supply to...

  12. 75 FR 48370 - Biweekly Notice Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2010-08-10

    ... ensures the timely transfer of plant safety system loads to the Emergency Diesel Generators in the event a... a margin of safety. The basis for this proposed determination for each amendment request is shown... Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10 CFR Part 2. Interested person(s...

  13. 47 CFR 74.113 - Supplementary reports with application for renewal of license.

    Science.gov (United States)

    2010-10-01

    ... renewal of license. 74.113 Section 74.113 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED... covered. (4) Power employed, field intensity measurements and visual and aural observations and the types... respective types of transmissions. (5) Estimated degree of public participation in reception and the results...

  14. 75 FR 52039 - Biweekly Notice Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2010-08-24

    ... the design earthquake, the double design earthquake, the Hosgri earthquake, and the loss-of-coolant... by the Chief Administrative Judge of the Atomic Safety and Licensing Board Panel, will rule on the....m. Eastern Time on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the...

  15. 75 FR 13786 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2010-03-23

    ... earthquake (DE), double design earthquake (DDE), Hosgri earthquake (HE), and loss of coolant accident (LOCA... Administrative Judge of the Atomic Safety and Licensing Board Panel, will rule on the request and/or petition...-Filing system no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the...

  16. Guide for the preparation of applications for licenses for the use of self-contained dry source-storage irradiators. Second proposed Revision 1

    International Nuclear Information System (INIS)

    Bassin, N.

    1984-10-01

    The purpose of this regulatory guide is to provide assistance to applicants and licensees in preparing applications for new licenses, license amendments, and license renewals for the use of self-contained dry source-storage irradiators. These irradiators are constructed so that the sealed sources and the material being irradiated are contained in a shielded volume and there is no external radiation beam during the use of the irradiator. The radioisotopes most commonly used for these irradiators are cobalt-60 and cesium-137

  17. The law of international organisations

    CERN Document Server

    White, Nigel D

    2017-01-01

    This book provides a concise account of the principles and norms of international law applicable to the main-type of international organisation - the inter-governmental organisation (IGO). That law consists of principles and rules found in the founding documents of IGOs along with applicable principles and rules of international law. The book also identifies and analyses the law produced by IGOs, applied by them and, occasionally, enforced by them. There is a concentration upon the United Nations, as the paradigmatic IGO, not only upon the UN organisation headquartered in New York, but on other IGOs in the UN system (the specialised agencies such as the World Health Organisation).

  18. The Applicability of Maslow's Hierarchy of Needs Model to Saudi Organisations

    OpenAIRE

    Fallatah, Rodwan Hashim Mohammed; Saudi Arabia Ministry of Higher Education

    2015-01-01

    One of the most influential and often quoted content theories of human motivation is Abraham Maslow’s Hierarchy of Needs. Maslow’s theory is based on an assumption that all humans are motivated by a hierarchy of needs that are fundamental and universal. While many studies have attested to the wide relevance and applicability of this model, some other legitimate studies have argued that the theory is limited in terms of its universal applicability because of its Anglo-Saxon monoculture orienta...

  19. ITER Safety and Licensing

    International Nuclear Information System (INIS)

    Girard, J-.P; Taylor, N.; Garin, P.; Uzan-Elbez, J.; GULDEN, W.; Rodriguez-Rodrigo, L.

    2006-01-01

    The site for the construction of ITER has been chosen in June 2005. The facility will be implemented in Europe, south of France close to Marseille. The generic safety scheme is now under revision to adapt the design to the host country regulation. Even though ITER will be an international organization, it will have to comply with the French requirements in the fields of public and occupational health and safety, nuclear safety, radiation protection, licensing, nuclear substances and environmental protection. The organization of the central team together with its partners organized in domestic agencies for the in-kind procurement of components is a key issue for the success of the experimentation. ITER is the first facility that will achieve sustained nuclear fusion. It is both important for the experimental one-of-a-kind device, ITER itself, and for the future of fusion power plants to well understand the key safety issues of this potential new source of energy production. The main safety concern is confinement of the tritium, activated dust in the vacuum vessel and activated corrosion products in the coolant of the plasma-facing components. This is achieved in the design through multiple confinement barriers to implement the defence in depth approach. It will be demonstrated in documents submitted to the French regulator that these barriers maintain their function in all postulated incident and accident conditions. The licensing process started by examination of the safety options. This step has been performed by Europe during the candidature phase in 2002. In parallel to the final design, and taking into account the local regulations, the Preliminary Safety Report (RPrS) will be drafted with support of the European partner and others in the framework of ITER Task Agreements. Together with the license application, the RPrS will be forwarded to the regulatory bodies, which will launch public hearings and a safety review. Both processes must succeed in order to

  20. Facilities license application record data as of April 1, 1981. Tri-annual report 30 Nov 80-1 Apr 81

    International Nuclear Information System (INIS)

    1981-06-01

    The FLAR is divided into three parts as follows: Part I - The first part is a listing of all operating licenses, authorizations and construction permits in effect plus applications pending; Part II - The second part is a listing of applications that have been withdrawn or denied, and licenses and construction permits terminated or revoked; and Part III - The third part is a listing of research, test and power reactors for export

  1. ITER licensing

    International Nuclear Information System (INIS)

    Gordon, C.W.

    2005-01-01

    ITER was fortunate to have four countries interested in ITER siting to the point where licensing discussions were initiated. This experience uncovered the challenges of licensing a first of a kind, fusion machine under different licensing regimes and helped prepare the way for the site specific licensing process. These initial steps in licensing ITER have allowed for refining the safety case and provide confidence that the design and safety approach will be licensable. With site-specific licensing underway, the necessary regulatory submissions have been defined and are well on the way to being completed. Of course, there is still work to be done and details to be sorted out. However, the informal international discussions to bring both the proponent and regulatory authority up to a common level of understanding have laid the foundation for a licensing process that should proceed smoothly. This paper provides observations from the perspective of the International Team. (author)

  2. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1983-10-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  3. Licensing topical report: application of probabilistic risk assessment in the selection of design basis accidents

    International Nuclear Information System (INIS)

    Houghton, W.J.

    1980-06-01

    A probabilistic risk assessment (PRA) approach is proposed to be used to scrutinize selection of accident sequences. A technique is described in this Licensing Topical Report to identify candidates for Design Basis Accidents (DBAs) utilizing the risk assessment results. As a part of this technique, it is proposed that events with frequencies below a specified limit would not be candidates. The use of the methodology described is supplementary to the traditional, deterministic approach and may result, in some cases, in the selection of multiple failure sequences as DBAs; it may also provide a basis for not considering some traditionally postulated events as being DBAs. A process is then described for selecting a list of DBAs based on the candidates from PRA as supplementary to knowledge and judgments from past licensing practice. These DBAs would be the events considered in Chapter 15 of Safety Analysis Reports of high-temperature gas-cooled reactors

  4. Regulations and the licensing process in Austria

    International Nuclear Information System (INIS)

    Matulla, Herbert U.

    1979-01-01

    A review of the licensing process which took place from 1971 to 1978 shows which laws, regulations and standards were used in checking the safety aspects of the nuclear power plant and which organisations participated in the licensing process. The internal organisation of the Austrian main-expert in the procedure is illustrated. Examples of detail-work are explained. The importance of intensive co-operation of the different technical groups and the problems of comparable examination depth are underlined. (author)

  5. Pesticide use and risk of end-stage renal disease among licensed pesticide applicators in the Agricultural Health Study.

    Science.gov (United States)

    Lebov, Jill F; Engel, Lawrence S; Richardson, David; Hogan, Susan L; Hoppin, Jane A; Sandler, Dale P

    2016-01-01

    Experimental studies suggest a relationship between pesticide exposure and renal impairment, but epidemiological evidence is limited. We evaluated the association between exposure to 39 specific pesticides and end-stage renal disease (ESRD) incidence in the Agricultural Health Study, a prospective cohort study of licensed pesticide applicators in Iowa and North Carolina. Via linkage to the US Renal Data System, we identified 320 ESRD cases diagnosed between enrolment (1993-1997) and December 2011 among 55 580 male licensed pesticide applicators. Participants provided information on use of pesticides via self-administered questionnaires. Lifetime pesticide use was defined as the product of duration and frequency of use and then modified by an intensity factor to account for differences in pesticide application practices. Cox proportional hazards models, adjusted for age and state, were used to estimate associations between ESRD and: (1) ordinal categories of intensity-weighted lifetime use of 39 pesticides, (2) poisoning and high-level pesticide exposures and (3) pesticide exposure resulting in a medical visit or hospitalisation. Positive exposure-response trends were observed for the herbicides alachlor, atrazine, metolachlor, paraquat, and pendimethalin, and the insecticide permethrin. More than one medical visit due to pesticide use (HR=2.13; 95% CI 1.17 to 3.89) and hospitalisation due to pesticide use (HR=3.05; 95% CI 1.67 to 5.58) were significantly associated with ESRD. Our findings support an association between ESRD and chronic exposure to specific pesticides, and suggest pesticide exposures resulting in medical visits may increase the risk of ESRD. Clinicaltrials.gov NCT00352924. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  6. Parameter Selection for Department of Energy Spent Nuclear Fuel to be Used in the Yucca Mountain License Application

    Energy Technology Data Exchange (ETDEWEB)

    D. L. Fillmore

    2003-10-01

    This report contains the chemical, physical, and radiological parameters that were chosen to represent the U.S. Department of Energy spent nuclear fuel in the Yucca Mountain license application. It also contains the selected packaging requirements for the various fuel types and the criticality controls that were used. The data are reported for representative fuels and bounding fuels in groups of fuels that were selected for the analysis. The justification for the selection of each parameter is given. The data reported were not generated under any quality assurance program.

  7. Standard format and content of a license application for a low-level radioactive waste disposal facility: Safety analysis report

    International Nuclear Information System (INIS)

    1988-01-01

    This document discusses the information that should be provided in the Safety Analysis Report and establishes a uniform format for presenting the information necessary to fulfill the licensing requirements for land disposal of radioactive waste called for in 10 CFR 61. The uniform format will (1) help ensure that the Safety Analysis Report contains the information required by 10 CFR 61, (2) aid the applicant and NRC staff in ensuring that the information is complete, (3) help persons reading the Safety Analysis Report to locate information, and (4) contribute to shortening the time needed for the review process

  8. Standard format and content of a license application for a low-level radioactive waste disposal facility: Safety analysis report

    International Nuclear Information System (INIS)

    1987-01-01

    This document discusses the information that should be provided in the Safety Analysis Report and establishes a uniform format for presenting the information necessary to fulfill the licensing requirements for land disposal of radioactive waste called for in 10 CFR 61. The uniform format will (1) help ensure that the Safety Analysis Report contains the information required by 10 CFR 61, (2) aid the applicant and NRC staff in ensuring that the information is complete, (3) help persons reading the Safety Analysis Report to locate information, and (4) contribute to shortening the time needed for the review process

  9. Licensing of ANSTO's Replacement Research Reactor

    International Nuclear Information System (INIS)

    Summerfield, M.W.; Garea, V.

    2003-01-01

    This paper presents a general description of the licensing of the 20 MW Pool-type Replacement Research Reactor (RRR) currently being built by the Australian Nuclear Science and Technology Organisation (ANSTO) at their Lucas Heights site. The following aspects will be addressed: 1) The influence of ARPANSA's (the Australian regulator) Regulatory Assessment Principles and Design Criteria on the design of the RRR. 2) The Site Licence Application, including the EIS and the supporting siting documentation. 3) The Construction Licence Application, including the PSAR and associated documentation. 4) The review process, including the IAEA Peer Review and the Public Submissions as well as ARPANSA's own review. 5) The interface between ANSTO, INVAP and ARPANSA in relation to the ongoing compliance with ARPANS Regulation 51 and 54. 6) The future Operating Licence Application, including the draft FSAR and associated documentation. These aspects are all addressed from the point of view of the licensee ANSTO and the RRR Project. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and how the licensing and regulatory regime within Australia influenced the design of the RRR. In particular, the safety design features that have been incorporated as a result of the specific requirements of ANSTO and the Australian regulator will be briefly described. The paper will close with a description of how the RRR meets, and in many aspects exceeds the requirements of ANSTO and the Australian regulator. (author)

  10. Organisational Effectiveness in Military Organisations

    Science.gov (United States)

    1988-11-01

    socialisatlon, an eq*msis on " belongingness " goals and a desire to maintain social solidarity in an increasingly individualistic social envirment. Cohm...statistical quality control and where employees often meet in their am time and usually receive a financial bcnus for the performance of the organisation. In...companies with more than 500 employees had QC programmes. ihle QCs have no decision making powrs, managers in many cases felt pressured to accept all

  11. Licensing of the OPAL reactor during construction and commissioning

    International Nuclear Information System (INIS)

    Summerfield, M.

    2007-01-01

    This paper presents a description of the licensing activities associated with the construction and commissioning of the Australian Nuclear Science and Technology Organisation's (ANSTO) OPAL reactor. It addresses the Construction Licence, the interface between ANSTO, INVAP (the contractor with responsibility for design and construction of the facility) and the Australian Radiation Protection and Nuclear Safety Agency (ARPANSA, the Australian nuclear regulator) during the construction of OPAL, specific licensing issues that have arisen during the construction and commissioning process, and the Operating Licence Application. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and the lessons learnt that may be of benefit to other licensees and regulators

  12. The pre-licensing of a multi-purpose hybrid research reactor for high-tech applications 'MYRRHA'

    International Nuclear Information System (INIS)

    Hakimi, N.; Dams, C.; Wertelaers, A.; Nys, V.; Schrauben, M.; Dresselaers, R.

    2013-01-01

    The Belgian Nuclear Research Centre in Mol has been working for several years on the design of a multi-purpose flexible irradiation facility in order to replace the ageing BR2, a multipurpose materials testing reactor (MTR), in operation since 1962. MYRRHA, a flexible fast spectrum research reactor is conceived as an accelerator driven system (ADS), able to operate in sub-critical and critical modes. It contains a proton accelerator of 600 MeV, a spallation target and a multiplying medium with MOX fuel, cooled by liquid lead-bismuth (Pb-Bi). Since February 2011, the Belgian Nuclear Research Centre has engaged in a 'pre-licensing' process with the regulatory authority for an estimated period up to mid 2014. The paper presents on the one hand the objectives of the pre-licensing phase as well as its implementation process and on the other hand, 2 implementing instruments which have been developed by the regulatory authority providing guidance to the designer of MYRRHA in order to meet the pre-licensing phase objectives. The first instrument is a strategic note for the design and operation of MYRRHA where as the second instrument is a guidance document for the format and content of a design options and provisions file (DOPF). Both instruments have been developed taking into account that MYRRHA is an irradiation facility using a Generation IV nuclear power system's type technology (liquid metal cooled fast neutron reactor). The strategic note overview aims to cover the safety approach as well as the security requirements and safeguards obligation applicable to MYRRHA. In particular, in the strategic note, a specific attention has been paid in order to ensure that a safety, security and safeguards integrated approach will drive the development of the MYRRHA design. The safety approach focuses on the safety goals and the minimum safety objectives set by the regulatory authority for this innovative design. The DOPF overview presents its objectives and structure resuming

  13. The influence of personal and organisational factors on entrepreneurship intention: An application in the health care sector.

    Science.gov (United States)

    Marques, Carla S; Valente, Sandra; Lages, Marisa

    2018-03-05

    This study sought to contribute to research on entrepreneurial intention by identifying which constructs of the entrepreneurial profile and internal conditions of health care organisations support entrepreneurship and contribute to the entrepreneurial intention of these organisations' employees. In addition to psychological attributes, cognitive processes, motivations, sociodemographic and professional characteristics, and entrepreneurial skills, the literature indicates that internal conditions of organisations also contribute to explaining entrepreneurial intention. To evaluate this model empirically, the primary data were collected with questionnaires distributed to nurses in two public hospitals-the Trás-os-Montes and Alto Douro Hospital Center and the Local Health Unit of the Northeast. A total of 638 nurses filled out the questionnaire. The data were analysed using inferential and regression analyses. The results suggest that the dimensions related to personal attributes, namely, motivation and entrepreneurial skills, are the constructs that best explain the entrepreneurial intention of these professionals within their organisations. A broad discussion is needed about how to implement internal conditions that promote an intrapreneurial and innovative culture in health care organisations. Health care organisation administrators need to prioritise intrapreneurship while structuring their management strategies, thereby creating favourable internal conditions (e.g., support, autonomy, rewards, time availability and appropriate organisational procedures) that enhance their nurses' entrepreneurial intention. © 2018 John Wiley & Sons Ltd.

  14. License renewal process

    International Nuclear Information System (INIS)

    Fable, D.; Prah, M.; Vrankic, K.; Lebegner, J.

    2004-01-01

    The purpose of this paper is to provide information about license renewal process, as defined by Nuclear Regulatory Commission (NRC). The Atomic Energy Act and NRC regulations limit commercial power reactor licenses to an initial 40 years but also permit such licenses to be renewed. This original 40-year term for reactor licenses was based on economic and antitrust considerations not on limitations of nuclear technology. Due to this selected time period; however, some structures and components may have been engineered on the basis of an expected 40-year service life. The NRC has established a timely license renewal process and clear requirements codified in 10 CFR Part 51 and 10 CFR Part 54, that are needed to assure safe plant operation for extended plant life. The timely renewal of licenses for an additional 20 years, where appropriate to renew them, may be important to ensuring an adequate energy supply during the first half of the 21st Century. License renewal rests on the determination that currently operating plants continue to maintain adequate levels of safety, and over the plant's life, this level has been enhanced through maintenance of the licensing bases, with appropriate adjustments to address new information from industry operating experience. Additionally, NRC activities have provided ongoing assurance that the licensing bases will continue to provide an acceptable level of safety. This paper provides additional discussion of license renewal costs, as one of key elements in evaluation of license renewal justifiability. Including structure of costs, approximately value and two different approaches, conservative and typical. Current status and position of Nuclear Power Plant Krsko, related to license renewal process, will be briefly presented in this paper. NPP Krsko is designed based on NRC Regulations, so requirements from 10 CFR 51, and 10 CFR 54, are applicable to NPP Krsko, as well. Finally, this paper will give an overview of current status of

  15. Nuclear plant license renewal

    International Nuclear Information System (INIS)

    Gazda, P.A.; Bhatt, P.C.

    1991-01-01

    During the next 10 years, nuclear plant license renewal is expected to become a significant issue. Recent Electric Power Research Institute (EPRI) studies have shown license renewal to be technically and economically feasible. Filing an application for license renewal with the Nuclear Regulatory Commission (NRC) entails verifying that the systems, structures, and components essential for safety will continue to perform their safety functions throughout the license renewal period. This paper discusses the current proposed requirements for this verification and the current industry knowledge regarding age-related degradation of structures. Elements of a license renewal program incorporating NRC requirements and industry knowledge including a schedule are presented. Degradation mechanisms for structural components, their significance to nuclear plant structures, and industry-suggested age-related degradation management options are also reviewed

  16. License renewal

    International Nuclear Information System (INIS)

    Newberry, S.

    1993-01-01

    This article gives an overview of the process of license renewal for nuclear power plants. It explains what is meant by license renewal, the significance of license renewal, and goes over key elements involved in the process of license renewal. Those key elements are NRC requirements embodied in 10 CFR Part 54 (Reactor Safety) and 10 CFR Part 51 (Environmental Issues). In addition Industry Reports must be developed and reviewed. License renewal is essentially the process of applying for a 20 year extension to the original 40 year operating license granted for the plant. This is a very long term process, which involves a lot of preparation, and compliance with regulatory rules and guidelines. In general it is a process which is expected to begin when plants reach an operating lifetime of 20 years. It has provisions for allowing the public to become involved in the review process

  17. Development and application of a deterministic-realistic hybrid methodology for LOCA licensing analysis

    International Nuclear Information System (INIS)

    Liang, Thomas K.S.; Chou, Ling-Yao; Zhang, Zhongwei; Hsueh, Hsiang-Yu; Lee, Min

    2011-01-01

    Highlights: → A new LOCA licensing methodology (DRHM, deterministic-realistic hybrid methodology) was developed. → DRHM involves conservative Appendix K physical models and statistical treatment of plant status uncertainties. → DRHM can generate 50-100 K PCT margin as compared to a traditional Appendix K methodology. - Abstract: It is well recognized that a realistic LOCA analysis with uncertainty quantification can generate greater safety margin as compared with classical conservative LOCA analysis using Appendix K evaluation models. The associated margin can be more than 200 K. To quantify uncertainty in BELOCA analysis, generally there are two kinds of uncertainties required to be identified and quantified, which involve model uncertainties and plant status uncertainties. Particularly, it will take huge effort to systematically quantify individual model uncertainty of a best estimate LOCA code, such as RELAP5 and TRAC. Instead of applying a full ranged BELOCA methodology to cover both model and plant status uncertainties, a deterministic-realistic hybrid methodology (DRHM) was developed to support LOCA licensing analysis. Regarding the DRHM methodology, Appendix K deterministic evaluation models are adopted to ensure model conservatism, while CSAU methodology is applied to quantify the effect of plant status uncertainty on PCT calculation. Generally, DRHM methodology can generate about 80-100 K margin on PCT as compared to Appendix K bounding state LOCA analysis.

  18. Contestable Licensing

    OpenAIRE

    Zvika Neeman; Gerhard O. Orosel

    2000-01-01

    We analyze a model of repeated franchise bidding for natural monopoly with contestable licensing - a franchisee halds an (exclusive) license to operate a franchise until another rm offers to pay more for it. In a world where quality is observable but not veri able, the simple regulatory scheme we describe combines market-like incentives with regulatory oversight to generate efficient outcomes.

  19. Radiopharmaceutical licensing

    International Nuclear Information System (INIS)

    Mather, S.J.

    1992-01-01

    Recent health service legislation, and especially the loss of crown immunity has once again focussed attention on the arrangements for licensing of radiopharmaceuticals. The aim of the article is to describe in general terms the UK licensing system and in particular to provide guidance to those responsible for the supply of radiopharmaceuticals in hospitals. (author)

  20. Reactor licensing

    International Nuclear Information System (INIS)

    Harvie, J.D.

    2002-01-01

    This presentation discusses reactor licensing and includes the legislative basis for licensing, other relevant legislation , the purpose of the Nuclear Safety and Control Act, important regulations, regulatory document, policies, and standards. It also discusses the role of the CNSC, its mandate and safety philosophy

  1. Preparing as an organization, to submit or to review a construction license application for a DGR of ILW and HLW in France. French National Case - Andra - Preparing to Submit Cigeo's Creation License Application

    International Nuclear Information System (INIS)

    Boissier, Fabrice; Labalette, T.; Leverd, Pascal C.; Voinis, Sylvie

    2014-01-01

    The reversible repository in a deep geological formation is the French reference solution for the long-term management of high-level and intermediate-level long-lived radioactive waste. Since the first French Act on nuclear waste management research (1991), Andra has carried out twenty years of conceptual and basic studies on the subject, leading in particular to the feasibility demonstration in 2005 and to the choice of the detailed reconnaissance zone (ZIRA) in 2010. Taking advantage from this work, Andra has now reached a new phase where the project is engaging in the design of the industrial installation named Cigeo. At this stage, the further development of the project implies that Andra undertakes a multiplicity of actions in order to successfully reach various external and internal key milestones. Of paramount importance is the careful articulation between the regulatory authorization and decision processes and the outcome of the industrial installation design phases. In 2006 was built a regulatory framework that plans a succession of step by step decisions stages: 2013: Public debate on reversibility, memory keeping, environmental and health survey modalities, dialogue with the local stakeholders to harmoniously define and plan the external infrastructures that have to be developed to support the construction and the operation of Cigeo (roads, railway tracks and terminal, power and water supplies, etc.). 2015: Creation license application and start of the regulatory review process (notably various plans of the installation, the description of the solution envisaged for the closure of the facility, the preliminary safety case (operational safety, long-term safety, protection against malevolent actions, management of incidental situations, preliminary acceptance criteria), environmental impact studies (health, salubrity, transports, human activities, nature, patrimonial aspects). 2016-2017: new parliamentary Act on the reversibility conditions of the

  2. 22 CFR 96.30 - State licensing.

    Science.gov (United States)

    2010-04-01

    ... Licensing and Corporate Governance § 96.30 State licensing. (a) The agency or person is properly licensed or... person follows applicable State licensing and regulatory requirements in all jurisdictions in which it provides adoption services. (c) If it provides adoption services in a State in which it is not itself...

  3. Standard Review Plan for the review of a license application for a low-level radioactive waste disposal facility

    International Nuclear Information System (INIS)

    1994-04-01

    The Standard Review Plan (SRP) (NUREG-1200) provides guidance to staff reviewers in the Office of Nuclear Material Safety and Safeguards who perform safety reviews of applications to construct and operate low-level radioactive waste disposal facilities. The SRP ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate proposed changes in the scope and requirements of the staff reviews. The SRP makes information about the regulatory licensing process widely available and serves to improve the understanding of the staff's review process by interested members of the public and the industry. Each individual SRP addresses the responsibilities of persons performing the review, the matters that are reviewed, the Commission's regulations and acceptance criteria necessary for the review, how the review is accomplished, the conclusions that are appropriate, and the implementation requirements

  4. Issues in the review of a license application for an above grade low-level radioactive waste disposal facility

    Energy Technology Data Exchange (ETDEWEB)

    Ringenberg, J.D. [Nebraska Dept. of Environmental Quality, NE (United States)

    1993-03-01

    In December 1987, Nebraska was selected by the Central Interstate Compact (CIC) Commission as the host state for the construction of a low-level radioactive waste disposal facility. After spending a year in the site screening process, the Compact`s developer, US Ecology, selected three sites for detailed site characterization. These sites were located in Nemaha, Nuckolls and Boyd Counties. One year later the Boyd County site was selected as the preferred site and additional site characterization studies were undertaken. On July 29, 1990, US Ecology submitted a license application to the Nebraska Department of Environmental Control (now Department of Environmental Quality-NDEQ). This paper will present issues that the NDEQ has dealt with since Nebraska`s selection as the host state for the CIC facility.

  5. Application of PLUTO Test Facility for U. S. NRC Licensing of a Fuel Assembly

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Dongseok; Shin, Changhwan; Lee, Kanghee; Kang, Heungseok [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-10-15

    The fuel assembly of the PLUS-7 loaded in the APR-1400 follows the same schedule. Meanwhile, In July 1998, the U.S. NRC adopted a research plan to address the effects of high burnup from a Loss of Coolant Accident (LOCA). From these programs, several important technical findings for rule revision were obtained. Based on the technical findings, the U. S. NRC has amended the 10 CFR 50.46 which will be proclaimed sooner or later. Through the amendment, a LOCA analysis on the fuel assembly has to show the safety at both a fresh and End of Life (EOL) state. The U. S. NRC has already required EOL effects on seismic/LOCA performance for a fuel assembly since 1998. To obtain U.S NRC licensing of a fuel assembly, based on the amendment of 10CFR50.46, a LOCA analysis of the fuel assembly has to show safety both fresh and EOL states. The proper damping factor of the fuel assembly measured at the hydraulic test loop for a dynamic model in a LOCA and a seismic analysis code are at least required. In this paper, we have examined the damping technologies and compared the test facility of PLUTO with others in terms of performance. PLUTO has a better performance on the operating conditions than any others.

  6. Organisational learning by way of organisational development

    DEFF Research Database (Denmark)

    Elkjær, Bente

    In the paper, the idea is explored of organisational learning as the opening andclosure of organisational space for inquiry or reflective thinking, as a way toconstruct organisational learning as an object for research. This is done by asking thequestion of whether an organisational development...... project contributes toorganisational learning. The point of departure is a municipality in Denmark workingtoward digitalising its administration. The conclusion is that the success of such aprocess very much depends on an organisation's ability to encompass severalunderstandings of organisational...... development and digital administration and tosustain them in a productive form of tension instead of pursuing only one of them....

  7. Dealing with the current permissibility application for constructing a spent fuel DGR in Sweden. SKB's license applications for a spent fuel repository

    International Nuclear Information System (INIS)

    Olsson, Olle

    2014-01-01

    The nuclear power utilities in Sweden were in 1976 obliged to demonstrate a safe method for final disposal of spent fuel in order to start operation of new reactors. This initiated a comprehensive research, development and demonstration programme and the development of the KBS-method for final disposal. A new Nuclear Activities Act in 1984 gave the reactor owners full technical and financial responsibility for the waste. They gave in turn SKB the responsibility for all nuclear waste management. Reprocessing was no longer required and direct disposal of the spent fuel has, since then, been the main alternative. Alternative methods for final disposal have been evaluated and compared to the KBS-3-method but it has remained the preferred alternative. A comprehensive research, development and demonstration programme to strengthen the scientific basis and to refine the KBS-3-method has been operated by SKB since then. The site selection process for the final repository for spent nuclear fuel was initiated in 1992. The work included general siting studies at the national and the municipal level and in 2002, SKB initiated site investigations for siting of a final repository on two sites: the Simpevarp and Laxemar areas and the Forsmark area. At the same time, the work on preparing license applications to construct and operate an encapsulation plant and a final repository for spent fuel was started. In June 2009, SKB announced Forsmark as the selected site for the final repository. This paper reviews the applicable legislation and describes the license application, the licensing review and the preparations for implementation

  8. Consensus on quality indicators to assess the organisation of palliative cancer and dementia care applicable across national healthcare systems and selected by international experts.

    Science.gov (United States)

    van Riet Paap, Jasper; Vernooij-Dassen, Myrra; Dröes, Rose-Marie; Radbruch, Lukas; Vissers, Kris; Engels, Yvonne

    2014-09-17

    Large numbers of vulnerable patients are in need of palliative cancer and dementia care. However, a wide gap exists between the knowledge of best practices in palliative care and their use in everyday clinical practice. As part of a European policy improvement program, quality indicators (QIs) have been developed to monitor and improve the organisation of palliative care for patients with cancer and those with dementia in various settings in different European countries. A multidisciplinary, international panel of professionals participated in a modified RAND Delphi procedure to compose a set of palliative care QIs based on existing sets of QIs on the organisation of palliative care. Panellists participated in three written rounds, one feedback round and one meeting. The panel's median votes were used to identify the final set of QIs. The Delphi procedure resulted in 23 useful QIs. These QIs represent key elements of the organisation of good clinical practice, such as the availability of palliative care teams, the availability of special facilities to provide palliative care for patients and their relatives, and the presence of educational interventions for professionals. The final set also includes QIs that are related to the process of palliative care, such as documentation of pain and other symptoms, communication with patients in need of palliative care and their relatives, and end-of-life decisions. International experts selected a set of 23 QIs for the organisation of palliative care. Although we particularly focused on the organisation of cancer and dementia palliative care, most QIs are generic and are applicable for other types of diseases as well.

  9. 78 FR 29391 - Luminant Generation Company, LLC; Combined License Application for Comanche Peak Nuclear Power...

    Science.gov (United States)

    2013-05-20

    ... only temporary relief from the applicable regulation and the licensee has made good faith efforts to... only temporary relief from the regulations of 10 CFR 50.71(e)(3)(iii). Luminant has made good faith... applicable regulation and the licensee has made good faith efforts to comply with the regulation'' (10 CFR 50...

  10. 78 FR 36014 - Deepwater Port License Application: Liberty Natural Gas, LLC, Port Ambrose Deepwater Port

    Science.gov (United States)

    2013-06-14

    ... timeline for processing an application. When MarAd and USCG determine that an application contains the... that Port Ambrose falls within the proposed area of interest for the New York Power Authority Long Island-New York City Offshore Wind Project. This project will be acknowledged and considered in the...

  11. 75 FR 32450 - Idaho Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2010-06-08

    .... Name of Project: C.J. Strike Hydroelectric Project. f. Location: The project is located on the Snake... Snake River. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street, NE., Room 2A, Washington...

  12. 75 FR 57266 - Idaho Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2010-09-20

    ...) is located on the Snake River in Gooding, Twin Falls and Elmore Counties, Idaho. The Lower Salmon Falls Project (P-2061) is located on the Snake River in Gooding and Twin Falls Counties, Idaho. Both.... Locations of the Application: A copy of the application is available for inspection and reproduction at the...

  13. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes. Revision 7 was published in January 1993 and became effective in August 1993. Supplement 1 is being issued primarily to implement administrative changes to the requalification examination program resulting from the amendment to 10 CFR 55 that eliminated the requirement for every licensed operator to pass an NRC-conducted requalification examination as a condition for license renewal. The supplement does not substantially alter either the initial or requalification examination processes and will become effective 30 days after its publication is noticed in the Federal Register. The corporate notification letters issued after the effective date will provide facility licensees with at least 90 days notice that the examinations will be administered in accordance with the revised procedures

  14. Proposal of organisation and ALARA procedures for maintenance site: application to replacement of steam generator; Propositions d'organisation et procedures ALARA pour la preparation des chantiers de maintenance: application au RGV

    Energy Technology Data Exchange (ETDEWEB)

    Lochard, J; Lefaure, C

    1989-08-01

    This report proposes generic organization and ALARA procedures for preparing a maintenance site at a NPP. After a short description of the ALARA principle, it describes the proposition for French sites. They are grouped according to the following: motivation, organisation, means. They are illustrated by the example of steam generator replacement. Three special points concerning preparation of the site are developed: education; training of operators; review of the project.

  15. Workshop on Regulatory Review and Safety Assessment Issues in Repository Licensing

    Energy Technology Data Exchange (ETDEWEB)

    Wilmot, Roger D. (Galson Sciences Limited (United Kingdom))

    2011-02-15

    The workshop described here was organised to address more general issues regarding regulatory review of SKB's safety assessment and overall review strategy. The objectives of the workshop were: - to learn from other programmes' experiences on planning and review of a license application for a nuclear waste repository, - to offer newly employed SSM staff an opportunity to learn more about selected safety assessment issues, and - to identify and document recommendations and ideas for SSM's further planning of the licensing review

  16. 76 FR 67723 - CRD Hydroelectric, LLC; Notice of Application To Amend License and Accepted for Filing...

    Science.gov (United States)

    2011-11-02

    ... two turbine/generator units rather than the previously approved three units. The applicant does not propose any change to the authorized installed capacity or maximum hydraulic capacity. l. Locations of the...

  17. Safety and licensing of MOX versus UO2 for BWRs and PWRs: Aspects applicable for civilian and weapons grade Pu

    International Nuclear Information System (INIS)

    Goldstein, L.; Malone, J.

    2000-01-01

    This paper reviews the safety and licensing differences between MOX and UO 2 BWR and PWR cores. MOX produced from the normal recycle route and from weapons grade material are considered. Reload quantities of recycle MOX assemblies have been licensed and continue to operate safely in European LWRs. In general, the European MOX assemblies in a reload are 2 . These studies indicated that no important technical or safety related issues have evolved from these studies. The general specifications used by fuel vendors for recycled MOX fuel and core designs are as follows: MOX assemblies should be designed to minimize or eliminate local power peaking mismatches with co-resident and adjacently loaded UO 2 assemblies. Power peaking at the interfaces arises from different neutronic behavior between UO 2 and MOX assemblies. A MOX core (MOX and UO 2 or all-MOX assemblies) should provide cycle energy equivalent to that of an all-UO 2 core. This applies, in particular, to recycle MOX applications. An important consideration when burning weapons grade material is rapid disposition which may not necessarily allow for cycle energy equivalence. The reactivity coefficients, kinetics data, power peaking, and the worth of shutdown systems with MOX fuel and cores must be such to meet the design criteria and fulfill requirements for safe reactor operation. Both recycle and weapons grade plutonium are considered, and positive and negative impacts are given. The paper contrasts MOX versus UO 2 with respect to safety evaluations. The consequences of some transients/accidents are compared for both types of MOX and UO 2 fuel. (author)

  18. 75 FR 3217 - J&T Hydro Company; H. Dean Brooks and W. Bruce Cox; Notice of Application for Transfer of License...

    Science.gov (United States)

    2010-01-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11392-009] J&T Hydro Company; H. Dean Brooks and W. Bruce Cox; Notice of Application for Transfer of License and Soliciting Comments and Motions To Intervene January 12, 2010. On October 30, 2009, J&T Hydro Company (transferor) and...

  19. 75 FR 15419 - Notice of Intent To Grant Exclusive License of U.S. Patent Application No. 12/432,842 Filed April...

    Science.gov (United States)

    2010-03-29

    ... Exclusive License of U.S. Patent Application No. 12/432,842 Filed April 30, 2009 Entitled: ``A Soil Stabilization Soil Comprising Same, and a Method of Stabilizing Soil'' AGENCY: Department of the Army, U.S. Army... climates with sandy, gravelly soils where emulsions and hydraulic cements will not effectively cure. If...

  20. Organising to Enable Innovation

    DEFF Research Database (Denmark)

    Brink, Tove

    2016-01-01

    The purpose of this conceptual paper is to reveal how organising can enable innovation across organisational layers and organisational units. This approach calls for a cross-disciplinary literature review. The aim is to provide an integrated understanding of innovation in an organisational approach....... The findings reveal a continous organising process between individual/ team creativity and organisational structures/control to enable innovation at firm level. Organising provides a dynamic approach and contains the integrated reconstruction of creativity, structures and boundaries for enhanced balance...... of explorative and exploitative learning in uncertain environments. Shedding light on the cross-disciplinary theories to organise innovation provides a contribution at the firm level to enable innovation....

  1. 77 FR 9998 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2012-02-21

    ... more conservative values that incorporate measurement uncertainty. Additionally, one of the operating..., in accordance with 10 CFR 2.302(g), with their initial paper filing requesting authorization to... purpose of the adjudicatory filings and would constitute a Fair Use application, participants are...

  2. 77 FR 10491 - Progress Energy Carolinas, Inc.; Notice of Application for Amendment of License and Soliciting...

    Science.gov (United States)

    2012-02-22

    ... ensuring the continued safe and reliable production of hydroelectric power at the project. Among other... Intervene, and Protests Take notice that the following hydroelectric application has been filed with the.... Name of Project: Yadkin-Pee Dee Hydroelectric Project. f. Location: Lake Tillery in Montgomery and...

  3. 77 FR 28372 - South Carolina Public Service Authority; Notice of Application for Amendment of License and...

    Science.gov (United States)

    2012-05-14

    ... documents may be filed electronically via the Internet. See, 18 CFR 385.2001(a)(1)(iii) and the instructions... marina, fuel and sewage pump-out services, restrooms, parking, shops, restaurant, swimming pool, rental cottages, boardwalk, wooden deck, and remote parking for boat trailers. l. Locations of the Application: A...

  4. 77 FR 38618 - Idaho Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2012-06-28

    ... Hydroelectric Project. f. Location: The project is located in south-western Idaho on the Snake River from river... application is available for inspection and reproduction at the Commission's Public Reference Room, located at... available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be...

  5. 76 FR 51016 - Idaho Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2011-08-17

    .... Name of Project: Twin Falls Hydroelectric Project. f. Location: This project is located on the Snake... application is available for inspection and reproduction at the Commission's Public Reference Room, located at... available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be...

  6. 78 FR 51753 - AUC, LLC Reno Creek, In Situ Project, New Source Material License Application

    Science.gov (United States)

    2013-08-21

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 040-09092; [NRC-2013-0164] AUC, LLC Reno Creek, In Situ..., AUC, LLC (AUC) submitted to the U.S. Nuclear Regulatory Commission (NRC) an application for a new... and operation, and decommissioning of AUC's proposed in-situ uranium recovery (ISR, also known as in...

  7. 76 FR 3927 - Ameren Missouri; Combined License Application for Callaway Plant Unit 2; Exemption

    Science.gov (United States)

    2011-01-21

    ... public health or safety, and are consistent with the common defense and security; and (2) special... only temporary relief from the applicable regulation and the licensee has made good faith efforts to... good faith efforts to comply with 10 CFR 50.71(e)(3)(iii) by submitting Revision 1 to the COL...

  8. 77 FR 76539 - Ameren Missouri; Combined License Application For Callaway Plant, Unit 2; Exemption

    Science.gov (United States)

    2012-12-28

    ... present an undue risk to public health or safety, and are consistent with the common defense and security... regulation and the licensee or applicant has made good faith efforts to comply with the regulation'' (10 CFR... good faith efforts to comply with 10 CFR 50.71(e)(3)(iii) by submitting Revision 1 to the COL...

  9. 77 FR 63301 - Juneau Hydropower, Inc.; Notice of Draft License Application and Preliminary Draft Environmental...

    Science.gov (United States)

    2012-10-16

    .... 791(a)-825(r). h. Applicant Contact: Duff Mitchell, Business Manager, Juneau Hydropower, Inc., P.O... information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnline... access the document. For assistance, contact FERC Online Support. You may also register online at http...

  10. 76 FR 18801 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2011-04-05

    ... request: The proposed change would revise the application of Risk-Managed Technical Specifications (RMTS) to Technical Specification (TS) 3.7.7, ``Control Room Makeup and Cleanup Filtration System.'' This... change allows the Configuration Risk Management Program (CRMP) to be applied to Technical Specification...

  11. Viability Assessment of a Repository at Yucca Mountain. Volume 4: License Application Plan and Costs

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-12-01

    defensible LA. Volume 4 is divided into seven sections. Section 2 presents a rationale and summary for the technical work to be done to develop the preclosure and postclosure safety cases that will support the compliance evaluations required for the evaluation of site suitability and for licensing. Section 2 also describes other necessary technical work, including that needed to support design decisions and development of the necessary design information. Section 3 presents a more detailed description of the technical work required to address the issues identified in Section 2. Section 3 also describes activities that will continue after submittal of the site recommendation and the LA. Examples include the drift scale heater test in the Exploratory Studies Facility (Section 3.1.4.3) and long-term waste package corrosion testing (Section 3.2.2.9). Section 4 discusses the statutory and regulatory framework for site recommendation and submittal of an LA, and describes the activities and documentation that must be completed to achieve these milestones, including the development of an EIS. Section 5 describes the numerous activities required to support program milestones, including support for completing the testing program, continuing tests as part of the performance confirmation program, and managing information and records to support regulatory and legal review. Sections 6 and 7 provide cost and schedule information for the activities planned.

  12. Flexible licensing

    Directory of Open Access Journals (Sweden)

    Martyn Jansen

    2012-07-01

    Full Text Available The case is presented for a more flexible approach to licensing online library resources. Today's distributed education environment creates pressure for UK higher and further education institutions (HEI/FEIs to form partnerships and to develop educational products and roll them out across the globe. Online library resources are a key component of distributed education and yet existing licensing agreements struggle to keep pace with the increasing range of users and purposes for which they are required. This article describes the process of developing a flexible approach to licensing and proposes a new model licence for online library resources which has the adaptability needed in this new global educational landscape. These ideas have been presented and discussed at various workshops across Eduserv's and JISC Collections' higher education and publisher communities, and further consultation is ongoing.

  13. Marble Hill Nuclear Generating Station, Units 1 and 2. License application, PSAR, general information

    International Nuclear Information System (INIS)

    1975-01-01

    An application is presented for two PWR reactors to be constructed in Salud Township, Jefferson County, Indiana, about six miles northeast of New Washington on the Ohio River. Each unit will have a rated core power level of 3411 MW(t) with a corresponding electrical output of 1130 MW(e). Mechanical draft cooling towers will be provided. The facility, which will replicate the Byron facility will be employed for the generation of electricity for transmission, sale for resale, and distribution

  14. Black Fox Station, Units 1 and 2. Application for construction permits and operating licenses

    International Nuclear Information System (INIS)

    1975-01-01

    An application to construct and operate Black Fox Station, Units 1 and 2, is presented. The two BWR type reactors will have a rated core thermal power of 3579 MW(t) and a net electrical power of approximately 1150 MW(e). The facility will be located in Inola Township, 23 miles east of Tulsa on the east side of the Verdigris River in Rogers County, Oklahoma

  15. Edwin I. Hatch Nuclear Plant, Unit 2. License application, general information

    International Nuclear Information System (INIS)

    1975-01-01

    An application for a direct cycle BWR is presented. The reactor will be located about 11 miles north of Baxley, Ga., near the south bank of the Ultamaha River in Appling County close to Hatch-1 Reactor. The core thermal power level will be 2537 MW(t) and the electrical power level will be 795 MW(e). Mechanical cooling towers will be utilized

  16. Licensing in BE system code calculations. Applications and uncertainty evaluation by CIAU method

    International Nuclear Information System (INIS)

    Petruzzi, Alessandro; D'Auria, Francesco

    2007-01-01

    The evaluation of uncertainty constitutes the necessary supplement of Best Estimate (BE) calculations performed to understand accident scenarios in water cooled nuclear reactors. The needs come from the imperfection of computational tools on the one side and from the interest in using such tool to get more precise evaluation of safety margins. In the present paper the approaches to uncertainty are outlined and the CIAU (Code with capability of Internal Assessment of Uncertainty) method proposed by the University of Pisa is described including ideas at the basis and results from applications. Two approaches are distinguished that are characterized as 'propagation of code input uncertainty' and 'propagation of code output errors'. For both methods, the thermal-hydraulic code is at the centre of the process of uncertainty evaluation: in the former case the code itself is adopted to compute the error bands and to propagate the input errors, in the latter case the errors in code application to relevant measurements are used to derive the error bands. The CIAU method exploits the idea of the 'status approach' for identifying the thermal-hydraulic conditions of an accident in any Nuclear Power Plant (NPP). Errors in predicting such status are derived from the comparison between predicted and measured quantities and, in the stage of the application of the method, are used to compute the uncertainty. (author)

  17. Integrated ground-water monitoring strategy for NRC-licensed facilities and sites: Case study applications

    Science.gov (United States)

    Price, V.; Temples, T.; Hodges, R.; Dai, Z.; Watkins, D.; Imrich, J.

    2007-01-01

    This document discusses results of applying the Integrated Ground-Water Monitoring Strategy (the Strategy) to actual waste sites using existing field characterization and monitoring data. The Strategy is a systematic approach to dealing with complex sites. Application of such a systematic approach will reduce uncertainty associated with site analysis, and therefore uncertainty associated with management decisions about a site. The Strategy can be used to guide the development of a ground-water monitoring program or to review an existing one. The sites selected for study fall within a wide range of geologic and climatic settings, waste compositions, and site design characteristics and represent realistic cases that might be encountered by the NRC. No one case study illustrates a comprehensive application of the Strategy using all available site data. Rather, within each case study we focus on certain aspects of the Strategy, to illustrate concepts that can be applied generically to all sites. The test sites selected include:Charleston, South Carolina, Naval Weapons Station,Brookhaven National Laboratory on Long Island, New York,The USGS Amargosa Desert Research Site in Nevada,Rocky Flats in Colorado,C-Area at the Savannah River Site in South Carolina, andThe Hanford 300 Area.A Data Analysis section provides examples of detailed data analysis of monitoring data.

  18. Guide to request license for teletherapy practice

    International Nuclear Information System (INIS)

    2000-01-01

    In this work the steps to request license for teletherapy practice are described , among these steps they it continued it plows to request the qualified personnel's yams, the operation authorization, application purpose, license type

  19. List of Nuclear Materials Licensing Actions Received

    Data.gov (United States)

    Nuclear Regulatory Commission — A catalog of all Materials Licensing Actions received for review. The catalog lists the name of the entity submitting the license application, their city and state,...

  20. 75 FR 4571 - Government-Owned Inventions; Availability for Licensing

    Science.gov (United States)

    2010-01-28

    .... Applications: Therapies for tumors associated with NF1 (including brain and peripheral nervous system tumors...-US-01). Licensing Status: Available for licensing. Licensing Contact: Patrick P. McCue, Ph.D.; 301...

  1. Multiscale Model Simulations of Temperature and Relative Humidity for the License Application of the Proposed Yucca Mountain Repository

    Science.gov (United States)

    Buscheck, T.; Glascoe, L.; Sun, Y.; Gansemer, J.; Lee, K.

    2003-12-01

    ; these variables are determined every 20 m for each emplacement drift in the repository. The MSTHM accounts for 3-D drift-scale and mountain-scale heat flow and captures the influence of the key engineering-design variables and natural-system factors affecting TH conditions in the emplacement drifts and adjoining host rock. Presented is a synopsis of recent MSTHM calculations conducted to support the Total System Performance Assessment for the License Application (TSPA-LA). This work was performed under the auspices of the U.S. Department of Energy by University of California Lawrence Livermore National Laboratory under contract No. W-7405-Eng-48.

  2. Clinch River Breeder Reactor Plant. License application, statement of general information

    International Nuclear Information System (INIS)

    1975-01-01

    Application is made for a reactor facility consisting of a liquid metal cooled reactor and steam generator system, a steam turbine driven electric generating system, electrical switchyard, and related auxiliaries and supporting structures. The primary system is located in an inert atmosphere in shielded vaults within a containment structure. Sodium coolant is used to remove heat from the core and radial blanket. Heat from the primary sodium is transferred in heat exchangers to non radioactive sodium which is used to convert feed-water into steam which is superheated to drive a tandem-compound generator. A single shaft multi-stage turbine generator produces 380 MW(e) with steam conditions of 1450 psig at 900 0 F. Fuel is sintered ceramic pellets of mixed uranium-plutonium oxides encapsulated in stainless steel. There are 198 fuel assemblies with each assembly consisting of 217 fuel rods placed in a hexagonal channel. Plutonium enrichment ranges from 1817 to 32.0 percent by weight. Axial blanket sections contain depleted UO 2 with 99.8 percent 238 U and 0.2 percent 235 U by weight. The proposed location of the plant is within the corporate limits of the city of Oak Ridge in Roane County, Tennessee. (U.S.)

  3. Clinical application analysis of andrographolide total ester sulfonate injection, a traditional Chinese medicine licensed in China.

    Science.gov (United States)

    Zhao, Ying; Huang, Pu; Chen, Zhe; Zheng, Si-Wei; Yu, Jin-Yang; Shi, Chen

    2017-04-01

    Andrographolide total ester sulfonate (ATES) injection is one of the products of traditional Chinese medicine (TCM) currently used against viral infection in China. ATES injection was approved for manufacturing and marketing in January 2002. It is indicated for acute respiratory infections, tonsillitis, chronic obstructive pulmonary disease, influenza, foot and mouth disease, bronchiolitis, herpangina, mumps, infectious mononucleosis and psychosis. However, its usage also carries risk. We investigated the use of ATES at the Wuhan Union Hospital from January 2014 to December 2014 and evaluated its real-world clinical application using the hospital centralized monitoring method. A total of 848 cases were enrolled in this study. In these cases, it was mainly used for postoperative anti-inflammation and treating upper respiratory infection, pneumonia and bronchitis. Among them, 39.86% were contraindicated. Irregular medication of adults and children accounted for 1.91% and 23.38%, respectively. Improper choice of solvent accounted for 3.18%. The choice of intravenous drip versus aerosol inhalation was reasonable. A case of adverse events (AEs) was observed in the monitoring period, and the incidence of adverse drug reaction (ADR) of ATES injection was 0.12%. ATES injection in our hospital is relatively safe with a low incidence of adverse reactions. The study assesses the clinical usage and adverse reactions of ATES injection, and provides suggestions for rational use in clinical practice.

  4. Licensing safety critical software

    International Nuclear Information System (INIS)

    Archinoff, G.H.; Brown, R.A.

    1990-01-01

    Licensing difficulties with the shutdown system software at the Darlington Nuclear Generating Station contributed to delays in starting up the station. Even though the station has now been given approval by the Atomic Energy Control Board (AECB) to operate, the software issue has not disappeared - Ontario Hydro has been instructed by the AECB to redesign the software. This article attempts to explain why software based shutdown systems were chosen for Darlington, why there was so much difficulty licensing them, and what the implications are for other safety related software based applications

  5. From the feasibility assessment to the licensing application: organisation of the data acquisition, how to deal with metrological limits, uncertainties and project milestones; how far must we go?

    International Nuclear Information System (INIS)

    Landais, P.; Labalette, T.

    2009-01-01

    The research work summarised in the Dossier 2005 Argile has provided detailed information on each of the repository components but also on the determination, the analysis and the assessment of the main phenomena which are occurring within the repository. Their detailed representation associated with proposed repository architectures allowed the processing of the data in order to assess the robustness of the repository and to see how it would meet safety requirements. Through various indicators, the analysis showed that the three main safety functions preventing water circulation, limiting radionuclides release and immobilizing them in the repository and delaying and attenuating radionuclide migration were effectively fulfilled by the proposed system in both normal and much more penalizing situations. The PARS as well as the QSA already facilitated a systematic identification of uncertainties, then allowing covering them either trough cautious hypothesis, penalizing or conservative representation of some phenomena or components, sensitivity studies or altered evolution scenarios. Subsequently, the safety analysis revealed some residual uncertainties and margins for potential progress which will provide useful orientations for future research developments. While the safety analysis conducted reveals that the repository appears to be robust in all the configurations envisaged with respect to its safety functions, both CNE and safety authority evaluations focus on the necessity to provide more comprehensive and realistic modelling of the behavior of the repository (both exploitation and post-closure periods) and of the radionuclides. For example, it is requested not to consider the perturbed zone (EDZ) as a dead zone the characteristics and properties of which are set to zero in terms of transport. Similarly, when ANDRA constructed its safety case, an envelope hypothesis for conducting calculations led to consider the repository as fully saturated as soon as its closure. It has been asked to ANDRA to present for the next dossier a phenomenological approach of the hydric transient taking into account the gas production and migration issues but also the potential consequences of reversibility. Those recommendations led to set up a scientific programme for the 2008-2012 period that aims at improving the representation of repository evolutions over time, extract the relevant parameters for monitoring during the reversibility phases, reduce the parametric uncertainties and enhance the robustness of models for performance calculations and safety analyses. (authors)

  6. Organisational change: Deliberation and modification

    NARCIS (Netherlands)

    Jonker, C.M.; Schut, M.C.; Treur, J.

    2003-01-01

    For an information-agent-based system to support virtual (Internet-supported) organisations, changes in environmental conditions often demand changes in organisational behaviour, i.e., organisational changes. As organisational behaviour relates to organisational structure, rethinking the structure

  7. Software licenses: Stay honest!

    CERN Multimedia

    Computer Security Team

    2012-01-01

    Do you recall our article about copyright violation in the last issue of the CERN Bulletin, “Music, videos and the risk for CERN”? Now let’s be more precise. “Violating copyright” not only means the illegal download of music and videos, it also applies to software packages and applications.   Users must respect proprietary rights in compliance with the CERN Computing Rules (OC5). Not having legitimately obtained a program or the required licenses to run that software is not a minor offense. It violates CERN rules and puts the Organization at risk! Vendors deserve credit and compensation. Therefore, make sure that you have the right to use their software. In other words, you have bought the software via legitimate channels and use a valid and honestly obtained license. This also applies to “Shareware” and software under open licenses, which might also come with a cost. Usually, only “Freeware” is complete...

  8. Application of game theory and new institutional economics in establishing a National Voluntary Organisation for Professional Evaluation in Nigeria

    Directory of Open Access Journals (Sweden)

    Denis Jobin

    2017-07-01

    Results and conclusion: To break this barrier, we proposed a new deal to the leaders that had the advantages of reshaping the ‘rules of the game’. We proposed a federation of associations, akin to a coalition in game theory. The result was that all leaders came together under this umbrella organisation, to celebrate the evaluation year in 2015 and committed under the Abuja Declaration on Evaluation to register and establish an association, with an elected board, a written constitution and election bylaws. The association is governed by a Board of Trustees, which is chaired by the former Minister of Planning. Elections are planned for the end of 2017.

  9. Environmental Standard Review Plan for the review of a license application for a low-level radioactive waste disposal facility: Environmental report

    International Nuclear Information System (INIS)

    1987-04-01

    The Environmental Standard Review Plan (ESRP) (NUREG-1300) provides guidance to staff reviewers in the Office of Nuclear Material Safety and Safeguards who perform environmental reviews of environmental reports prepared by applicants in support of license applications to construct and operate new low-level radioactive waste disposal facilities. The individual ESRPs that constitute this document identify the information considered necessary to conduct the review, the purpose and scope of the review, the analysis procedure and evaluation, the formal input to the environmental statement, and the references considered appropriate for each review. The ESRP is intended to ensure quality and uniformity of approach in individual reviews as well as compliance with the National Environmental Policy Act of 1969. In addition, the ESRP will make information about the environmental component of the licensing process more readily available and thereby will serve to improve the understanding of this process among the public, States and regional compacts, and the regulated community

  10. The safety case in support of the license application of the surface repository of low-level waste in Dessel, Belgium

    International Nuclear Information System (INIS)

    Wacquier, William; Cool, Wim

    2014-01-01

    The modern concept of the safety case, developed by the OECD/NEA for geological repositories of high- and medium-level waste has been successfully applied by ONDRAF/ NIRAS for a surface repository for Category A waste (i.e. low-level waste) in Belgium in the current project phase 2006-2012. This resulted in the submission on 31 January 2013 by ONDRAF/NIRAS of an application for a 'construction and operation license' to the safety authorities. The benefits of using the notion of the safety case have been that: i) safety has been incorporated in an integrated manner within all assessment basis, design and safety assessment activities; ii) the process of development of the license application has gained in clarity and traceability; iii) the documentation of the license application contains multiple lines of argumentation for safety rather than argumentation based only on quantitative radiological impact calculations. To offer a comprehensive view on the safety argumentation and its development, it has been found useful to develop the argumentation not only along a safety statements structure but also along the safety report structure. (authors)

  11. PBMR-SA licensing project organization

    International Nuclear Information System (INIS)

    Clapisson, G.A.; Metcalf, P.E.; Mysen, A.

    2001-01-01

    The South African nuclear regulatory authority, the Council for Nuclear Safety (CNS), is beginning the safety review of the Pebble Bed Modular Reactor (PBMR) design under development by the South African National Electrical Utility, Eskom. This paper describes the CNS licensing process, including the establishment of basic licensing criteria, general design criteria, and specific design rules, as well the safety assessment to be conducted in accordance with the established structure. It also summarises the CNS PBMR review project activities, including the overall organisational arrangements, licensing basis, safety and risk assessment, general operating rules and plant design engineering, and pre-operational testing. (author)

  12. License plate recognition (phase B).

    Science.gov (United States)

    2010-06-01

    License Plate Recognition (LPR) technology has been used for off-line automobile enforcement purposes. The technology has seen mixed success with correct reading rate as high as 60 to 80% depending on the specific application and environment. This li...

  13. Administrativ organisation og ansvar

    DEFF Research Database (Denmark)

    Hilsted, Jannik C; Krogsgaard, Kim

    2003-01-01

    The paper describes the current organisation of clinical trials in Danish hospitals, with particular emphasis on the relationship between hospitals and the pharmaceutical industry. Legal responsibilities as well as mutual agreements on collaboration and organisation are described and discussed....

  14. DOE Patents Available for Licensing

    International Nuclear Information System (INIS)

    Stuber, C.

    1981-01-01

    DOE Patents Available for Licensing (DOE PAL) provides abstracting and indexing coverage of the DOE patent literature, including patent applications, that concerns any apsect of energy production, conservation, and utilization. The citations are arranged by subject category. DOE is prepared to grant exclusive or nonexclusive, revocable licenses under DOE-owned US patents and patent applications in accordance with the provisions of 10CFR781

  15. Challenges of SMR licensing practices

    Energy Technology Data Exchange (ETDEWEB)

    Soderholm, K., E-mail: kristiina.soderholm@fortum.com [Fortum Power, Espoo (Finland)

    2012-12-15

    This paper aims to increase the understanding of high level Nuclear Power Plant (NPP) licensing processes in Finland, France, the UK, Canada and the USA. These countries have been selected for this study because of their different licensing processes and recent actions in new NPP construction. After discussing their similarities and differences, suitable features for Small Modular Reactor licensing can be emphasized and suggested. Some of the studied licensing processes have elements that are already quite well suited for application to SMRs, but all of these different national processes can benefit from studying and implementing lessons learned from SMR specific licensing needs. The main SMR features to take into account in licensing are standardization of the design, modularity, mass production and serial construction. Modularity can be divided into two different categories: the first category is simply a single unit facility constructed of independently engineered modules (e.g., construction process for Westinghouse AP-1000 NPP) and the second is a facility structure composed of many reactor modules where modules are manufactured in factories and installed into the facility as needed (e.g., NuScale Power SMR design). Short construction schedules will not be fully benefited from if the long licensing process prolongs the commissioning and approach to full-power operation. The focus area of this study is to better understand the possibility of SMR deployment in small nuclear countries, such as Finland, which currently has four operating NPPs. The licensing process needs to be simple and clear to make SMR deployment feasible from an economical point of view. This paper uses public information and interviews with experts to establish the overview of the different licensing processes and their main steps. A high-level comparison of the licensing steps has been carried out. Certain aspects of the aviation industry licensing process have also been studied and certain

  16. Organisational Structure & Change

    Science.gov (United States)

    National Centre for Vocational Education Research (NCVER), 2006

    2006-01-01

    Structural change is seen as a way to meet the challenges of the future that face many organisations. While some writers agree that broad-ranging structural change may not always transform an organisation or enhance its performance, others claim that innovation will be a major source of competitive advantage to organisations, particularly when…

  17. Application of self-organising maps towards segmentation of soybean samples by determination of inorganic compounds content.

    Science.gov (United States)

    Cremasco, Hágata; Borsato, Dionísio; Angilelli, Karina Gomes; Galão, Olívio Fernandes; Bona, Evandro; Valle, Marcos Eduardo

    2016-01-15

    In this study, 20 samples of soybean, both transgenic and conventional cultivars, which were planted in two different regions, Londrina and Ponta Grossa, both located at Paraná, Brazil, were analysed. In order to verify whether the inorganic compound levels in soybeans varied with the region of planting, K, P, Ca, Mg, S, Zn, Mn, Fe, Cu and B contents were analysed by an artificial neural network self-organising map. It was observed that with a topology 10 × 10, 8000 epochs, initial learning rate of 0.1 and initial neighbourhood ratio of 4.5, the network was able to differentiate samples according to region of origin. Among all of the variables analysed by the artificial neural network, the elements Zn, Ca and Mn were those which most contributed to the classification of the samples. The results indicated that samples planted in these two regions differ in their mineral content; however, conventional and transgenic samples grown in the same region show no difference in mineral contents in the grain. © 2015 Society of Chemical Industry.

  18. Application of self-organising maps towards segmentation of soybean samples by determination of amino acids concentration.

    Science.gov (United States)

    Silva, Lívia Ramazzoti Chanan; Angilelli, Karina Gomes; Cremasco, Hágata; Romagnoli, Érica Signori; Galão, Olívio Fernandes; Borsato, Dionisio; Moraes, Larissa Alexandra Cardoso; Mandarino, José Marcos Gontijo

    2016-09-01

    Soybeans are widely used both for human nutrition and animal feed, since they are an important source of protein, and they also provide components such as phytosterols, isoflavones, and amino acids. In this study, were determined the concentrations of the amino acids lysine, histidine, arginine, asparagine, glutamic acid, glycine, alanine, valine, isoleucine, leucine, tyrosine, phenylalanine present in 14 samples of conventional soybeans and 6 transgenic, cultivated in two cities of the state of Paraná, Londrina and Ponta Grossa. The results were tabulated and presented to a self-organising map for segmentation according planting regions and conventional or transgenic varieties. A network with 7000 training epochs and a 10 × 10 topology was used, and it proved appropriate in the segmentation of the samples using the data analysed. The weight maps provided by the network, showed that all the amino acids were important in targeting the samples, especially isoleucine. Three clusters were formed, one with only Ponta Grossa samples (including transgenic (PGT) and common (PGC)), a second group with Londrina transgenic (LT) samples and the third with Londrina common (LC) samples. Copyright © 2016 Elsevier Masson SAS. All rights reserved.

  19. Application of the NEI 95-10 methodology in the Rcic system of the Unit-1, to implement the criterions of the license renovation rule; (10 Cfr-54)

    International Nuclear Information System (INIS)

    Diaz, A.; Mendoza, G.; Arganis, C.; Viais, J.; Contreras, A.; Fernandez, G.; Medina, G.

    2012-10-01

    In December of 1991, the US National Regulatory Commission (US NRC) published the 10 Cfr-54, to establish the procedures, criterions and necessary requirements for the license renovation of a nuclear power station. In 1994 the US NRC proposed an amendment to these requirements that basically were centered in the effects of the aging in structures and passive components of long life and in the inclusion of Time Limited Aging Analyses (TLAAs). In a general way, is established that the requester should show to the regulator body that the effects of the aging in structures, systems and components are and will be appropriately negotiated or that the TLAAs has been evaluated for the operation extended period. The NEI 95-10 is a guide document developed by the Nuclear Energy Institute (NEI), to provide a focus accepted to cover the requirements of 10 Cfr-54, offering an efficient process that allows to any requester to complete in a practical way the requirements of the License Renovation Rule and to supplement their solicitude. This work presents the application of this guide to the Reactor Core Insulation Cooling (Rcic) of the Unit 1 of the nuclear power plant of Laguna Verde, elect as pilot system to carry out the application of the 10 Cfr-54 following the recommended methodology by the Industrial Guide for the implementation of the License Renovation Rule. (Author)

  20. Evaluation of organisational culture and nurse burnout.

    Science.gov (United States)

    Watts, Jenny; Robertson, Noelle; Winter, Rachel; Leeson, David

    2013-10-01

    A survey of nurses working with older adults across three NHS trusts was conducted to explore how perceptions of the workplace affect nurse wellbeing. Standardised validated measures were used to assess burnout, perceived organisational support and organisational culture. Significant associations were found between innovative organisational culture and nurses' sense of personal accomplishment, which reduce the likelihood of burnout. Multiple regression showed experience of burnout to be predicted by the nature of organisational culture. It seems therefore that nurses' wellbeing may be affected by their perceptions of the working environment. Applications of this knowledge and suggestions for future research are discussed.

  1. 76 FR 7847 - Glenn A. Baxter, Application To Renew License for Amateur Radio Service Station K1MAN

    Science.gov (United States)

    2011-02-11

    ... Renew License for Amateur Radio Service Station K1MAN AGENCY: Federal Communications Commission. ACTION... Service Station K1MAN filed by Glenn A. Baxter should be granted. DATES: The document was mailed to the... Amateur Radio Station K1MAN should be granted. As discussed below, the record before us indicates that...

  2. 77 FR 16278 - License Renewal Application for Indian Point Nuclear Generating Units 2 and 3; Entergy Nuclear...

    Science.gov (United States)

    2012-03-20

    ... contacting the NRC about the availability of information regarding this document. You may access information... the Village of Buchanan, New York. The current operating licenses for IP2 and IP3 expire on September... units of measure; (2) a new thermal study that characterizes the thermal plume of cooling water...

  3. The Monticello license renewal project

    International Nuclear Information System (INIS)

    Clauss, J.M.; Harrison, D.L.; Pickens, T.A.

    1993-01-01

    Today, 111 nuclear power plants provide over 20 percent of the electrical energy generated in the United States. The operating license of the oldest operating plant will expire in 2003, one-third of the existing operating licenses will expire by 2010 and the newest plant's operating license will expire in 2033. The National Energy Strategy (NES) prepared by the Department of Energy (DOE) assumes that 70 percent of the current operating plants will continue to operate beyond their current license expiration. Power from current operating plants can assist in ensuring an adequate, diverse, and environmentally acceptable energy supply for economic growth and improved U.S. competitiveness. In order to preserve this energy resource, three major tasks must be successfully completed: (1) establishment of regulations, technical standards, and procedures for the preparation and review of License Renewal Applications (LRAs); (2) development of technical criteria and bases for monitoring, refurbishing or replacing plant equipment; and (3) demonstration of the regulatory process by a plant obtaining a renewed license. Since 1986, the DOE has been working with the nuclear industry and the Nuclear Regulatory Commission (NRC) to establish and demonstrate the option to extend the life of a nuclear power plant by renewing the operating license. The Monticello Lead Plant demonstration project was initiated in September 1988, following the Pilot Plant studies. This paper is primarily focused on the status and insights gained from the Northern States Power Company (NSP) Monticello Lead Plant demonstration project. The following information is included: (1) Current Status - Monticello License Renewal Application; (2) Economic Analysis; (3) License Renewal Regulatory Uncertainty Issues; (4) Key Decisions; (5) Management Structure; (6) Technical and Licensing Perspective; (7) NRC Interactions; (8) Summary

  4. Organisational Learning: Theoretical Shortcomings and Practical Challenges

    Directory of Open Access Journals (Sweden)

    Jon Aarum Andersen

    2014-05-01

    Full Text Available This paper addresses two problems related to learning and the use of knowledge at work. The first problem is the theoretical shortcomings stemming from the controversy between three different concepts of ‘organisational learning.’ In order to enhance scholarship in this field the notion that organisations - as organisations - can learn need to be rejected for theoretical and empirical reasons. The metaphorical use of ‘organisational learning’ creates only confusion. Learning is a process and knowledge is the outcome of that process. It is argued that learning and knowledge is only related to individuals. Knowledge is thus the individual capability to draw distinctions, within a domain of action, based on an appreciation of context or theory. Consequently, knowledge becomes organisational when it is created, developed and transmitted to other individuals in the organisation. In a strict sense knowledge becomes organisational when employees use it and act based on generalisations due to the rules and procedures found in their organisation. The gravest problem is practical challenges due to the fact that the emphasis on learning, knowledge and competence of the working force do not materialize in the application of the knowledge acquired. It is evident that employees do not use their increased knowledge. However, we do not know why they do not use it. An enormous waste of money is spent on learning and knowledge in organisations which does not yield what is expected. How can managers act in order to enhance the application of increased knowledge possessed by the workforce?

  5. Regulatory guidance for license renewal

    International Nuclear Information System (INIS)

    Thoma, John A.

    1991-01-01

    The proposed 10 CFR Part 54 rule proceduralizes the process for license renewal by identifying both the administrative and technical requirements for a renewal application. To amplify and support this regulation, written guidance has been provided in the form of a draft Regulatory Guide (DG 1009) and a draft Standard Review Plan for License Renewal (NUREG 1299). This guidance is scheduled to be finalized in 1992. Similar guidance will be provided for the proposed revisions to 10 CFR Part 51 concerning the environmental aspects of license renewal. (author)

  6. Lessons learned from the licensing process and the operational performance of the important to safety digital application implemented at the Mexican nuclear facilities

    International Nuclear Information System (INIS)

    Ledesma-Carrion, R.

    1998-01-01

    This paper describes the main concerns detected during the licensing processes performed by the Mexican Nuclear Regulatory Commission (CNSNS) for the NUMAC-PRNM, the Integrated Computer Systems at the Laguna Verde Nuclear Power Station (LVNPS) and for the Digital Control Console of the Triga Mark III Research Reactor (TMRR). The review and approval process was performed following the guidelines of the US Nuclear Regulatory Commission (USNRC); the regulatory frame applied includes the Code of Federal Regulation (10CFR50), some Regulatory Guides, such as: RG 1.152, RG 1.153, some Industrial Standards, for example: IEEE-279, IEEE-603, IEEE-7.4.3-2. Also, based on the operational experience taken from the LVNPS License Event Report (LER) reported under the 10CFR50.72 and 10CFR50.73 USNRC rules, and from the Report of Events to be Analyzed (REA) issued for a CNSNS agreement with the utility stated by the necessity to determine failure rates of digital equipment, some case studies and a preliminary failure cause classification is shown. The Event Report evaluation covered topics related to the software, hardware and firmware issues. Finally, the lessons learned from the licensing assessments and from the operational experience of the digital applications implemented are presented. It will also give the regulatory activities related to an IAEA international cooperation project on I and C digital upgrade concerns. (author)

  7. Streamlining the license renewal review process

    International Nuclear Information System (INIS)

    Dozier, J.; Lee, S.; Kuo, P.T.

    2001-01-01

    The staff of the NRC has been developing three regulatory guidance documents for license renewal: the Generic Aging Lessons Learned (GALL) report, Standard Review Plan for License Renewal (SRP-LR), and Regulatory Guide (RG) for Standard Format and Content for Applications to Renew Nuclear Power Plant Operating Licenses. These documents are designed to streamline the license renewal review process by providing clear guidance for license renewal applicants and the NRC staff in preparing and reviewing license renewal applications. The GALL report systematically catalogs aging effects on structures and components; identifies the relevant existing plant programs; and evaluates the existing programs against the attributes considered necessary for an aging management program to be acceptable for license renewal. The GALL report also provides guidance for the augmentation of existing plant programs for license renewal. The revised SRP-LR allows an applicant to reference the GALL report to preclude further NRC staff evaluation if the plant's existing programs meet the criteria described in the GALL report. During the review process, the NRC staff will focus primarily on existing programs that should be augmented or new programs developed specifically for license renewal. The Regulatory Guide is expected to endorse the Nuclear Energy Institute (NEI) guideline, NEI 95-10, Revision 2, entitled 'Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule', which provides guidance for preparing a license renewal application. This paper will provide an introduction to the GALL report, SRP-LR, Regulatory Guide, and NEI 95-10 to show how these documents are interrelated and how they will be used to streamline the license renewal review process. This topic will be of interest to domestic power utilities considering license renewal and international ICONE participants seeking state-of-the-art information about license renewal in the United States

  8. Licensing and advanced fuel designs

    International Nuclear Information System (INIS)

    Davidson, S.L.; Novendstern, E.H.

    1991-01-01

    For the past 15 years, Westinghouse has been actively involved in the development and licensing of fuel designs that contain major advanced features. These designs include the optimized fuel assembly, The VANTAGE 5 fuel assembly, the VANTAGE 5H, and most recently the VANTAGE+ fuel assembly. Each of these designs was supported by extensive experimental data, safety evaluations, and design efforts and required intensive interaction with the US Nuclear Regulatory Commission (NRC) during the review and approval process. This paper presents a description of the licensing approach and how it was utilized by the utilities to facilitate the licensing applications of the advanced fuel designs for their plants. The licensing approach described in this paper has been successfully applied to four major advanced fuel design changes ∼40 plant-specific applications, and >350 cycle-specific reloads in the past 15 years

  9. The Swedish radiological environmental protection regulations applied in a review of a license application for a geological repository for spent nuclear fuel.

    Science.gov (United States)

    Andersson, Pål; Stark, Karolina; Xu, Shulan; Nordén, Maria; Dverstorp, Björn

    2017-11-01

    For the first time, a system for specific consideration of radiological environmental protection has been applied in a major license application in Sweden. In 2011 the Swedish Nuclear Fuel & Waste Management Co. (SKB) submitted a license application for construction of a geological repository for spent nuclear fuel at the Forsmark site. The license application is supported by a post-closure safety assessment, which in accordance with regulatory requirements includes an assessment of environmental consequences. SKB's environmental risk assessment uses the freely available ERICA Tool. Environmental media activity concentrations needed as input to the tool are calculated by means of complex biosphere modelling based on site-specific information gathered from site investigations, as well as from supporting modelling studies and projections of future biosphere conditions in response to climate change and land rise due to glacial rebound. SKB's application is currently being reviewed by the Swedish Radiation Safety Authority (SSM). In addition to a traditional document review with an aim to determine whether SKB's models are relevant, correctly implemented and adequately parametrized, SSM has performed independent modelling in order to gain confidence in the robustness of SKB's assessment. Thus, SSM has used alternative stylized reference biosphere models to calculate environmental activity concentrations for use in subsequent exposure calculations. Secondly, an alternative dose model (RESRAD-BIOTA) is used to calculate doses to biota that are compared with SKB's calculations with the ERICA tool. SSM's experience from this review is that existing tools for environmental dose assessment are possible to use in order to show compliance with Swedish legislation. However, care is needed when site representative species are assessed with the aim to contrast them to generic reference organism. The alternative modelling of environmental concentrations resulted in much lower

  10. Organisational support, organisational identification and organisational citizenship behaviour among male nurses.

    Science.gov (United States)

    Chen, Sheng-Hwang; Yu, Hsing-Yi; Hsu, Hsiu-Yueh; Lin, Fang-Chen; Lou, Jiunn-Horng

    2013-11-01

    The purpose of this study was to explore the relationship between organisational support, organisational identification, and organisational citizenship behaviour and the predictors of organisational citizenship behaviour in Taiwanese male nurses. The turnover rate among male nurses is twice that of female nurses. Organisational citizenship behaviour is the predictor of turnover intention. Little information is available on the relationship between organisational support, organisational identification and organisational citizenship behaviour, particularly for male nurses. Data were collected in 2010 from a questionnaire mailed to 167 male nurses in Taiwan. A cross-sectional survey with simple sampling was used in this study. The results showed that organisational identification and organisational support were correlated with organisational citizenship behaviour. Organisational distinctiveness, organisational support of work conditions and the type of organisation were the main predictors of organisational citizenship behaviour. Together they accounted for 40.7% of the total variation in organisational citizenship behaviour. Organisational distinctiveness was the most critical predictor, accounting for 29.6% of the variation. Organisational support and organisational identification have positive relationships with organisational behaviour. Organisational distinctiveness is an important factor in explaining organisational citizenship behaviour in male nurses. This finding provides concrete directions for managers to follow when providing organisational identification, in particular, the organisational distinctiveness will help male nurses to display increasingly more organisational citizenship behaviour. © 2012 John Wiley & Sons Ltd.

  11. Rules for the licensing of new experiments in BR2: application to the test irradiation of new MTR-fuels

    International Nuclear Information System (INIS)

    Joppen, F.

    2000-01-01

    New types of MTR fuel elements are being developed and require a qualification before routine operation could be authorized. During the test irradiation the new fuel elements .are considered as experimental devices and their irradiation is allowed according to the procedures for experiments. Authorization is based on the advice .of a consultative committee on experiments. This procedure is valid as long as the irradiation is covered by the actual reactor license. An additional license or an amendment is only required if due to the experiment the risk for the workers or the environment is increased in a significant way. A few experimental fuel plates loaded in the primary loop of the reactor will not increase this risk. The source term for potential radioactive releases remains more or less the same. The probability for an accident can be limited by restricting the heat flux and surface temperature. (author)

  12. Using governance to understand how to improve an SME’s success with introducing ehealth applications in Dutch healthcare organisations

    NARCIS (Netherlands)

    Peterzon, Marike; Velthuijsen, Hugo

    2015-01-01

    The Hanze University of Applied Science can combine its expertise in the field of ICT with knowledge of communication and knowledge game design and user experience to contribute to the effective communication on ehealth applications by researching communication patterns and developing communication

  13. Researching enterprises between organisation and organising

    DEFF Research Database (Denmark)

    Elkjær, Bente; Brandi, Ulrik

    : State University of New York Press. Orlikowski, W. J. (1996). Improvising organizational transformation over time: A situated change perspective. Information Systems Research, 7(1), 63-92. Park, R. E. (1952). Human Communities: The City and Human Ecology Glencoe, IL: Free Press. Rosenthal, S. (1998......RESEARCHING ENTERPRISES BETWEEN ORGANISATION AND ORGANISING Ulrik Brandi & Bente Elkjaer, Department of Learning, University of Aarhus, Danish School of Education, Tuborgvej 164, 2400 Copenhagen NV, Denmark Short paper submission to the 26th European Group of Organization Studies Colloquium, Waves...... philosophy and pragmatism followed by an elaboration of the transactional relationship between subject and world and the notion of social worlds. The final element in the paper is an empirical illustration - researching organisational learning in the midst of change that illustrates the rhythm...

  14. ORGANISATIONAL CULTURE ANALYSIS MODEL

    OpenAIRE

    Mihaela Simona Maracine

    2012-01-01

    The studies and researches undertaken have demonstrated the importance of studying organisational culture because of the practical valences it presents and because it contributes to increasing the organisation’s performance. The analysis of the organisational culture’s dimensions allows observing human behaviour within the organisation and highlighting reality, identifying the strengths and also the weaknesses which have an impact on its functionality and development. In this paper, we try to...

  15. Fibrosing organising pneumonia.

    Science.gov (United States)

    Beardsley, Brooke; Rassl, Doris

    2013-10-01

    Organising pneumonia (otherwise referred to as bronchiolitis obliterans organising pneumonia) is characterised histologically by plugs of granulation tissue, which are present predominantly within small airways, alveolar ducts and peri-bronchiolar alveoli. This pattern is not specific for any disorder or cause, but is one type of inflammatory response to pulmonary injury, which may be seen in a wide variety of clinical conditions. Typically, organising pneumonia responds very well to corticosteroid treatment; however, a small percentage of patients appear to develop progressive fibrosis.

  16. Dry spent fuel storage licensing

    International Nuclear Information System (INIS)

    Sturz, F.C.

    1995-01-01

    In the US, at-reactor-site dry spent fuel storage in independent spent fuel storage installations (ISFSI) has become the principal option for utilities needing storage capacity outside of the reactor spent fuel pools. Delays in the geologic repository operational date at or beyond 2010, and the increasing uncertainty of the US Department of Energy's (DOE) being able to site and license a Monitored Retrievable Storage (MRS) facility by 1998 make at-reactor-site dry storage of spent nuclear fuel increasingly desirable to utilities and DOE to meet the need for additional spent fuel storage capacity until disposal, in a repository, is available. The past year has been another busy year for dry spent fuel storage licensing. The licensing staff has been reviewing 7 applications and 12 amendment requests, as well as participating in inspection-related activities. The authors have licensed, on a site-specific basis, a variety of dry technologies (cask, module, and vault). By using certified designs, site-specific licensing is no longer required. Another new cask has been certified. They have received one new application for cask certification and two amendments to a certified cask design. As they stand on the brink of receiving multiple applications from DOE for the MPC, they are preparing to meet the needs of this national program. With the range of technical and licensing options available to utilities, the authors believe that utilities can meet their need for additional spent fuel storage capacity for essentially all reactor sites through the next decade

  17. Generic evaluation of feedwater transients and small break loss-of-coolant accidents in GE-designed operating plants and near-term operating license applications

    International Nuclear Information System (INIS)

    1980-01-01

    The results are presented of a generic evaluation of feedwater transients, small-break loss-of-coolant accidents (LOCAs), and other TMI-2-related events for General Electric Company (GE)-designed operating plants and near-term operating license applications to confirm or establish the bases for the continued safe operation of the operating plants. The results of this evaluation are presented in this report in the form of a set of findings and recommendations in each of the principal review areas. Additional review of the accident is continuing and further information is being obtained and evaluated. Any new information will be reviewed and modifications will be made as appropriate

  18. The process of organisational adaptation through innovations, and organisational adaptability

    OpenAIRE

    Tikka, Tommi

    2010-01-01

    This study is about the process of organisational adaptation and organisational adaptability. The study generates a theoretical framework about organisational adaptation behaviour and conditions that have influence on success of organisational adaptation. The research questions of the study are: How does an organisation adapt through innovations, and which conditions enhance or impede organisational adaptation through innovations? The data were gathered from five case organisations withi...

  19. Leadership, organisational citizenship and innovative work ...

    African Journals Online (AJOL)

    Frederick Iraki

    Although organisational citizenship behaviour (OCB) and innovative work ... 'the intentional creation, introduction and application of new ideas within a work role, .... (the leader searches for deviations from rules and standards and takes ...

  20. 10 CFR 34.13 - Specific license for industrial radiography.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Specific license for industrial radiography. 34.13 Section 34.13 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY... industrial radiography. An application for a specific license for the use of licensed material in industrial...

  1. Licensed Healthcare Facilities

    Data.gov (United States)

    California Natural Resource Agency — The Licensed Healthcare Facilities point layer represents the locations of all healthcare facilities licensed by the State of California, Department of Health...

  2. 2015 Business Licenses

    Data.gov (United States)

    City of Jackson, Mississippi — This data displays all business license information for the year of 2015. This information details license classifications and status. This information will updated...

  3. Licensing of ANSTO'S OPAL reactor during construction and commissioning

    International Nuclear Information System (INIS)

    Summerfield, M.W.; Ordonez, J.P.

    2006-01-01

    Full text: This paper presents a general description of the ongoing licensing activities associated with the construction and commissioning of the Australian Nuclear Science and Technology Organisation's (ANSTO) Open Pool Australian Light-water (OPAL) Reactor at their Lucas Heights site. It addresses the following aspects: The Construction Licence - what it is and what impact it had on the construction of the OPAL Reactor, specifically the various Construction Licence Conditions; The interface between ANSTO, INVAP and ARPANSA during the construction of the OPAL Reactor, particularly in relation to ARPANS Regulation 54; Specific licensing issues that have arisen during the construction and commissioning process and how they have been resolved; The Operating Licence Application - what it is and how it interfaces with the construction and commissioning of the OPAL Reactor. These aspects are all addressed from the point of view of the licensee ANSTO and the RRR Project. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and the lessons learnt that may be of benefit to other licensees and regulators. Note that this paper is an update of a presentation given at IGORR10 and follows on from a paper previously presented at PNBC12 in October 2002

  4. NUMARC view of license renewal criteria

    International Nuclear Information System (INIS)

    Edwards, D.W.

    1989-01-01

    The Atomic Energy Act and the implementing regulations of the US Nuclear Regulatory Commission (NRC) permit the renewal of nuclear plant operating licenses upon expiration of their 40-year license term. However, the regulatory process by which license renewal may be accomplished and the requirements for the scope and content of renewal applications are yet to be established. On August 29, 1988, the NRC published an Advanced Notice of Proposed Rulemaking regarding the subject of license renewal. This Advanced Notice and the NUREG which it references, NUREG-1317, Regulatory Options for Nuclear Plant License Renewal, provide the most recent regulatory thought on this issue. The basic issue addressed by NUREG-1317 is the definition of an adequate licensing basis for the renewal of a plant license. The report contemplates three alternatives in this regard. This paper discusses each of these three proposals. The NUMARC NUPLEX Working Group endorses a license renewal process based on a plant's current licensing basis along with an evaluation of the pertinent components, systems, and structures affected by age-related degradation. The NUMARC NUPLEX Working group believes that an appropriate scope for NRC review of the license renewal application should focus on those safety-significant structures systems, and components subject to significant age-related degradation that are not subject to existing recognized effective replacement, refurbishment, or inspection programs. The paper also briefly discusses NUMARC's view of the role of the Backfit Rule in the license renewal process

  5. Kommunikation skaber din organisation

    DEFF Research Database (Denmark)

    Hansen, Heidi

    KOMMUNIKATION skaber din ORGANISATION tager udgangspunkt i en narrativ tilgang til kommunikation, hvor organisationen skabes i mødet mellem ledere, medarbejdere, organisation og omverden. Historier hjælper os med at skabe mening, og er derfor vigtige både som et udviklingsværktøj i organisationen...

  6. Organisational Structures & Considerations

    NARCIS (Netherlands)

    Luiijf, H.A.M.; Healey, J.

    2012-01-01

    The purpose of this section is to review specific types of national cyber security (NCS) areas (also called ‘mandates’) and examine the organisational and collaborative models associated with them. Before discussing the wide variety of organisational structures at the national and international

  7. Intervention in independent spent fuel storage facility license application proceedings for storage on the power plant site

    International Nuclear Information System (INIS)

    Jordan, J.

    1992-01-01

    This presentation summarizes the intervention in the Nuclear Regulatory Commission (NRC) licensing process for currently operating Independent Spent fuel Storage Installation (ISFSI) projects at Carolina Power and Light's Company's H.B. Robinson, Duke Power Company's Oconee, and Virginia Power Company's Surry. In addition, intervention at dry storage facilities that are currently under development are also described. The utilities and reactors include Baltimore Gas and Electric Company's Calvert Cliffs, Public Service Company of Colorado's Fort St. Vrain plant, Northern States Power Company's Prairie Island, Wisconsin Electric Power Company's Point Beach, and Consumers Power Company's Palisades

  8. Some inspirations drawn from the SKB license-application report for the construction of the final repository for spent nuclear fuel in Sweden

    International Nuclear Information System (INIS)

    Xu Guoqing

    2014-01-01

    The following problems are described in this paper: the current state of nuclear energy and spent fuel in Sweden, the brief process of repository site selection and the concise geological settings of candidate site Forsmark, the option of repository design, the data presented in license-application report on repository, construction, the review work presented by OECD/NEA international peer review team (IRT) and some considerations noted by the author: 1) Why the design of underground engineering, also known as 5 shafts + l ramp, is adopted? 2) Why the timescale for the assessment is one million years? 3) Why the computer codes used in performance assessment at Forsmark candidate repository site are different from those used at Yucca Mountain candidate repository site? 4) How to carry out the public involvement, support from local government and volumtary siting in China? 5) What is the most important in the R and D program of HLW disposal? 6) What shall we do for the future license-application report for the construction of the final repository in China? (author)

  9. Introducing organisational heritage: Linking corporate heritage, organisational identity, and organisational memory

    OpenAIRE

    Balmer, JMT; Burghausen, M

    2015-01-01

    In this article we formally introduce and explicate the organisational heritage notion. The authors conclude organisational heritage can be designated in three broad ways as: (1) organisational heritage identity as the perceived and reminisced omni-temporal traits – both formal/normative and utilitarian/societal – of organisational members’ work organisation; (2) organisational heritage identification as organisational members’ identification/self-categorisation vis-à-vis these perceived and ...

  10. Towards high-reliability organising in healthcare: a strategy for building organisational capacity.

    Science.gov (United States)

    Aboumatar, Hanan J; Weaver, Sallie J; Rees, Dianne; Rosen, Michael A; Sawyer, Melinda D; Pronovost, Peter J

    2017-08-01

    In a high-reliability organisation (HRO), safety and quality (SQ) is an organisational priority, and all workforce members are engaged, continuously learning and improving their work. To build organisational capacity for SQ work, we have developed a role-tailored capacity-building framework that we are currently employing at the Johns Hopkins Armstrong Institute for Patient Safety and Quality as part of an organisational strategy towards HRO. This framework considers organisation-wide competencies for SQ that includes all staff and faculty and is integrated into a broader organisation-wide operating management system for improving quality. In this framework, achieving safe, high-quality care is connected to healthcare workforce preparedness. Capacity-building efforts are tailored to the needs of distinct groups within the workforce that fall within three categories: (1) front-line providers and staff, (2) managers and local improvement personnel and (3) SQ leaders and experts. In this paper we describe this framework, our implementation efforts to date, challenges met and lessons learnt. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  11. Organisational skills and tools.

    Science.gov (United States)

    Wicker, Paul

    2009-04-01

    While this article mainly applies to practitioners who have responsibilities for leading teams or supervising practitioners, many of the skills and tools described here may also apply to students or junior practitioners. The purpose of this article is to highlight some of the main points about organisation, some of the organisational skills and tools that are available, and some examples of how these skills and tools can be used to make practitioners more effective at organising their workload. It is important to realise that organising work and doing work are two completely different things and shouldn't be mixed up. For example, it would be very difficult to start organising work in the middle of a busy operating list: the organisation of the work must come before the work starts and therefore preparation is often an important first step in organising work. As such, some of the tools and skills described in this article may need to be used hours or even days prior to the actual work taking place.

  12. Researching enterprises between organisation and organising

    OpenAIRE

    Elkjær, Bente; Brandi, Ulrik

    2010-01-01

    RESEARCHING ENTERPRISES BETWEEN ORGANISATION AND ORGANISINGUlrik Brandi & Bente Elkjaer, Department of Learning, University of Aarhus, Danish School of Education, Tuborgvej 164, 2400 Copenhagen NV, DenmarkShort paper submission to the 26th European Group of Organization Studies Colloquium, Waves of Globalization: Repetition and difference in organizing over time and space. June 30 - July 3 2010, Lisbon, Portugal.Sub-theme 16:  Investigating Organization as Becoming in a World on the Move ...

  13. Organisations in Innovation Systems

    DEFF Research Database (Denmark)

    Borrás, Susana

    Organisations are crucial elements in an innovation system. Yet, their role is so ubiquitous that it is difficult to grasp and to examine from the perspective of public policy. Besides, links between the literature at firm and system levels on the one hand, and public policy and governance studies......, it distinguishes between different types of organisations in the innovation system, a crucial topic in understanding innovation dynamics and blurring borders. Secondly, it identifies the organisation-related bottlenecks in the innovation system, and examines the policy instruments to solve them. Thirdly...

  14. Organised Cultural Encounters

    DEFF Research Database (Denmark)

    Christiansen, Lene Bull; Galal, Lise Paulsen; Hvenegård-Lassen, Kirsten

    2017-01-01

    The article introduces the special issue by presenting the concept of organised cultural encounters that are encounters organised to manage and/or transform problems perceived to originate in or include cultural differences. Inspired by Pratt’s conceptualisation of the contact zone, a critical...... perspective on the particular historical and spatial context of any encounter and how this context frames and mediates what takes place during an encounter is applied. While the articles of the issue present different varieties of organised cultural encounters, it is argued that they are not only of the same...

  15. Strategising through organising

    DEFF Research Database (Denmark)

    Larsen, Mette Vinther

    and sensemaking point of view. It argues that actors’ strategising is closely connected to their organising. Maybe strategising and organising co-constitute each other? It is a perspective that looks at strategy as emergent wayfinding more than planned navigating. In the attempts to make sense...... of and operationalise a strategy, maybe actors do not follow a pre-defined map, but instead figure out the way as they go? Maybe actors go in ways that they relationally believe are the ‘right ones’ and in ways that make sense to them? There are, however, many actors in an organisation and, therefore, also many ways...

  16. Responding to Organisational Misbehaviour

    DEFF Research Database (Denmark)

    Holmgreen, Lise-Lotte

    2018-01-01

    Over the past decades, the seriousness with which organisational crises have developed has, in part, been contingent on public access to social media platforms. Analysing two Danish organisational crises, the article explores whether the conceptual repertoires that underlie public evaluation...... of organisational behaviour are embedded in shared social and cultural practices that allow them to be expressed and shared easily and intuitively. The findings suggest that by drawing on well-established experiential domains in social and cultural life, users in public social media may instantiate frames...

  17. Regulatory systems-based licensing guidance documentation

    International Nuclear Information System (INIS)

    Delligatti, M.S.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) has developed a series of licensing guidance documents based on the regulatory requirements in Part 60 of Title 10 of the Code of Federal Regulations (10 CFR Part 60). This regulatory systems-based approach to licensing guidance documentation relies on the definition of the high-level waste repository in 10 CFR Part 60. A document which is important for the frame-work it gives to other programmatic licensing guidance is the Draft Regulatory Guide open-quotes Format and Content for the License Application for the High-Level Waste Repositoryclose quotes (FCRG). The FCRG describes a format and content acceptable to NRC for a high-level waste repository license application pursuant to the requirements of 10 CFR Part 60. Other licensing guidance documents will be compatible with the FCRG

  18. Technical Challenges in the Application and Licensing of Digital Instrumentation and Control Systems in Nuclear Power Plants

    International Nuclear Information System (INIS)

    2015-01-01

    With the modernization of existing analogue instrumentation and control (I&C) systems in nuclear power plants through digital I&C technology, and the implementation of digital I&C systems in new plants, the industry is faced with significant challenges. These challenges appear in the form of difficulties in managing the necessarily incremental transition, highly integrated (and interdependent) architectures, the flexible configurability enabled by digital technology, and uncertainty and inconsistency in licensing digital I&C systems and equipment in the different Member States. This publication discusses 17 major issues that utilities, developers, suppliers and regulatory stakeholders need to consider, so that the industry can capture and benefit from shared experience, recent technological developments, and emerging best practices

  19. Organisational IT managed from the shop floor

    DEFF Research Database (Denmark)

    Bolmsten, Johan; Dittrich, Yvonne

    2015-01-01

    Modern organisations need to be able to adjust to changes in the environment, changes which are ever more rapid, and in doing so capitalise on the creativity and innovations of their employees. As suggested by Boulus-Rødje and Bjørn (Chap. 14), information technology (IT) applications today...... are likely to take the form of complex, integrated infrastructures, supporting collaboration within and across organisations. This places requirements on the IT infrastructure. As the work practices within an organisation change, the supporting infrastructure also needs to evolve....

  20. Organisational Pattern Driven Recovery Mechanisms

    Science.gov (United States)

    Giacomo, Valentina Di; Presenza, Domenico; Riccucci, Carlo

    The process of reaction to system failures and security attacks is strongly influenced by its infrastructural, procedural and organisational settings. Analysis of reaction procedures and practices from different domains (Air Traffic Management, Response to Computer Security Incident, Response to emergencies, recovery in Chemical Process Industry) highlight three key requirements for this activity: smooth collaboration and coordination among responders, accurate monitoring and management of resources and ability to adapt pre-established reaction plans to the actual context. The SERENITY Reaction Mechanisms (SRM) is the subsystem of the SERENITY Run-time Framework aimed to provide SERENITY aware AmI settings (i.e. socio-technical systems with highly distributed dynamic services) with functionalities to implement applications specific reaction strategies. The SRM uses SERENITY Organisational S&D Patterns as run-time models to drive these three key functionalities.

  1. The Compassionate Organisation

    DEFF Research Database (Denmark)

    Jørgensen, Poul Erik Flyvholm; Isaksson, Maria

    2015-01-01

    – The research shows that the public sector sticks to its guns in maintaining a web-transmitted values discourse which forefronts goodwill towards its clients. It also shows that the public and private sectors take different approaches to goodwill. Originality/value – Strategists and communication specialists......Structured Abstract: Purpose – This paper tests whether organisations in the public domain have embraced a corporate type of discourse, mirroring the private sector’s preferred orientation towards expertise, or whether they maintain their traditional discourse of goodwill towards the publics...... a detailed analysis of organisational value statements posted on the websites of public and private organisations. The research considers the value priorities of fifty organisations in the UK and Scandinavia in order to gauge the extent of convergence between the two sectors’ preferred discourses. Findings...

  2. Leveraging organisational cultural capital

    Directory of Open Access Journals (Sweden)

    R Scheel

    2007-10-01

    Full Text Available Organisational culture discourse mandates a linear approach of diagnosis, measurement and gap analysis as standard practice in relation to most culture change initiatives. Therefore, a problem solving framework geared toward “fixing�? and/or realigning an organisation’s culture is usually prescribed. The traditional problem solving model seeks to identify gaps between current and desired organisational cultural states, inhibiting the discovery of an organisation’s unique values and strengths, namely its cultural capital. In pursuit of discovering and leveraging organisational cultural capital, a descriptive case study is used to show how an Appreciative Inquiry process can rejuvenate the spirit of an organisation as a system-wide inquiry mobilises a workforce toward a shared vision.

  3. Organisational Theatre and Polyphony

    DEFF Research Database (Denmark)

    Matula, Linda; Badham, Richard; Meisiek, Stefan

    This paper details the conditions leading up to and influencing an organisational theatre intervention as part of an organisational change program at a newly established cancer clinic. The paper explores the social and political interactions and negotiations shaping the structure and conditions...... of the organisational theatre event. It focuses in particular on the alignments and clashes between the different human resource voices in defining the ‘surface’ formal purpose for the intervention and the embeddedness of such interactions and negotiations in ‘deeper’ cultural and social conditions. The paper provides...... the first in-depth longitudinal study of shaping and negotiation of an organisational theatre event and the ways in which it is influenced by a polyphonic multivocality and takes the form of selective and partial forms of harmonious expression in establishing meaningful cooperation. The paper reveals...

  4. Strategy Development in Organisations

    DEFF Research Database (Denmark)

    Sørensen, Lene

    1999-01-01

    There exist certain ambiguities with the converging fields of information technology and organisational strategy development. The term "IT strategy" has evolved and reflects in some respects this confusion. This paper discusses some of the ambiguities and difficulties of the term "IT strategy......" as used in practice and literature. Emphasis is put on how the term is related to the problem, the organisation, the strategy process and the practical way of methodologically developing the strategy. Finally, alternative strategy developing perspectives are presented....

  5. 75 FR 54116 - Notice of Intent To Grant Partially Exclusive License of the United States Patent Application No...

    Science.gov (United States)

    2010-09-03

    ... coatings, side dressing, lawn application and starter ground cover) and applications in the fields of soil... announcement. ADDRESSES: United States Army Engineer Research and Development Center, Attn: CEERD-OT (Ms. Bea...

  6. Licensing an assured isolation facility for low-level radioactive waste. Volume 1: Licensing strategy and issues

    International Nuclear Information System (INIS)

    Silverman, D.J.; Bauser, M.A.; Baird, R.D.

    1998-07-01

    This report provides a detailed set of proposed criteria and guidance for the preparation of a license application for an assured isolation facility (AIF). The report is intended to provide a detailed planning basis upon which a prospective applicant may begin pre-licensing discussions with the Nuclear Regulatory Commission and initiate development of a license application. The report may also be useful to the NRC or to state regulatory agencies that may be asked to review such an application. Volume 1 of this report provides background information, and describes the licensing approach and methodology. Volume 2 identifies specific information that is recommended for inclusion in a license application

  7. 77 FR 40142 - Applications for Exemption: Commercial Driver's License (CDL) and Hours-of-Service (HOS) of Drivers

    Science.gov (United States)

    2012-07-06

    ... and Redding (joint FMCSA-2009-0010... application). Rotel Rotel provides motorcoach tours of the... individual, filed a joint application seeking relief for 20 CMV drivers who transport jet fuel in tank CMVs... all public comments received. The Agency concluded in each case that the application for exemption...

  8. Organisational learning in professional discourses.

    Directory of Open Access Journals (Sweden)

    Martin Sedláček

    2012-06-01

    Full Text Available Authors of the paper discuss the concept of organisational learning. Theyrefer to a wide range of definitions and concepts, point out some differences from related or analogous concepts used, such as knowledge management and learning organisation. They note the discussions that relate to key topics. These discussions concern levels at which organisational learning can take place, the effect on behaviour organisational performance. The following section of this article presents organisational learning as a process and describes the stages of organisational learning. The purpose of the article is to provide an overview of efforts to define organisational learning, including criticism of the results of this effort. The last partis devoted to selected theories and empirical findings on organisational learning atschool. The authors stress the importance of organisational learning for schools asspecific organisations and express request to examine the processes of organisational learning in this context.

  9. 15 CFR 732.4 - Steps regarding License Exceptions.

    Science.gov (United States)

    2010-01-01

    ... General Prohibition Six (Embargo), consult part 746 of the EAR for applicable License Exceptions. (b... export or reexport is subject to General Prohibition Six (Embargo) for embargoed destinations, License...

  10. Standard Review Plan for the review of a license application for a low-level radioactive waste disposal facility. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    The Standard Review Plan (SRP) (NUREG-1200) provides guidance to staff reviewers in the Office of Nuclear Material Safety and Safeguards who perform safety reviews of applications to construct and operate low-level radioactive waste disposal facilities. The SRP ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate proposed changes in the scope and requirements of the staff reviews. The SRP makes information about the regulatory licensing process widely available and serves to improve the understanding of the staff`s review process by interested members of the public and the industry. Each individual SRP addresses the responsibilities of persons performing the review, the matters that are reviewed, the Commission`s regulations and acceptance criteria necessary for the review, how the review is accomplished, the conclusions that are appropriate, and the implementation requirements.

  11. Standard Review Plan for the review of a license application for a low-level radioactive waste disposal facility: Safety analysis report

    International Nuclear Information System (INIS)

    1988-01-01

    The Standard Review Plan (SRP) (NUREG-1200) provides guidance to staff reviewers in the Office of Nuclear Material Safety and Safeguards who perform safety reviews of applications to construct and operate low-level radioactive waste disposal facilities. The SRP ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate proposed changes in the scope and requirements of the staff reviews. The SRP makes information about the regulatory licensing process widely available and serves to improve the understanding of the staff's review process by interested members of the public and the industry. Each individual SRP addresses the responsibilities of persons performing the review, the matters that are reviewed, the Commission's regulations and acceptance criteria necessary for the review, how the review is accomplished, the conclusions that are appropriate, and the implementation requirements

  12. Standard review plan for the review of a license application for a low-level radioactive waste disposal facility: Safety analysis report

    International Nuclear Information System (INIS)

    1987-01-01

    The Standard Review Plan (SRP) (NUREG-1200) provides guidance to staff reviewers in the Office of Nuclear Material Safety and Safeguards who perform safety reviews of applications to construct and operate low-level radioactive waste disposal facilities. The SRP ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate proposed changes in the scope and requirements of the staff reviews. The SRP makes information about the regulatory licensing process widely available and serves to improve the understanding of the staff's review process by interested members of the public and the nuclear power industry. Each individual SRP addresses the responsibilities of persons performing the review, the matters that are reviewed, the Commission's regulations and acceptance criteria necessary for the review, how the review is accomplished, the conclusions that are appropriate, and the implementation requirements

  13. License renewal in the United States

    International Nuclear Information System (INIS)

    Brons, Jack

    2002-01-01

    Full text: Nuclear plants in the United States are licensed for 40 years, a length specified in the Atomic Energy Act of 1954, which laid out much of the regulatory basis for the commercial nuclear industry. The Act, however, made provision for license renewal. The original 40-year license period was chosen arbitrarily by the U.S. Congress because it was the typical period over which utilities recovered their investment in electricity generating plants. Nuclear plants, however, are subject to a rigorous program of Nuclear Regulatory Commission oversight, maintenance and equipment replacement. In effect, they must be in the same operating condition on the last day of their licenses as they were on the first. As the industry matured, it became apparent that there was no physical limitation on the continued operation of nuclear plants past 40 years. The industry turned its attention toward license renewal. When the issue was first raised, the NRC considered stringent process equivalent to seeking a new operating license for each plant. The complexity, length and cost of the process made it unlikely that many nuclear plants would seek license renewal. The nuclear industry worked successfully with NRC on the application of generic principles to license renewal, however, and in 1995, the NRC issued an efficient, tightly-focused rule that made license renewal a safe, viable option. To extend the operating license for a reactor, a company must demonstrate to the NRC that aging effects will be adequately managed during the renewal terms, thus ensuring equipment functionality. The rule allows licensees to apply for extensions of up to 20 years. The first license renewal application was filed in 1998 by the owner of the two-unit Calvert Cliffs plant. Shortly thereafter, an application was filed for the three-unit Oconee Nuclear Station. The NRC renewed the licenses for all five units in 2000, and since then, five more licenses have been renewed. The NRC has received 37

  14. Overview of the Yucca Mountain Licensing Process

    International Nuclear Information System (INIS)

    M. Wisenburg

    2004-01-01

    This paper presents an overview of the licensing process for a Yucca Mountain repository for high-level radioactive waste and spent nuclear fuel. The paper discusses the steps in the licensing proceeding, the roles of the participants, the licensing and hearing requirements contained in the Code of Federal Regulations. A description of the Nuclear Regulatory Commission (NRC) staff acceptance and compliance reviews of the Department of Energy (DOE) application for a construction authorization and a license to receive and possess high-level radioactive waste and spent nuclear fuel is provided. The paper also includes a detailed description of the hearing process

  15. Intergovernmental organisation activities

    International Nuclear Information System (INIS)

    2016-01-01

    This section treats of the following Intergovernmental organisation activities: 1 - European Atomic Energy Community: Non-legally binding instruments (Commission Recommendation on the application of Article 103 of the Euratom Treaty; Communication from the Commission on a Nuclear Illustrative Program; Report from the Commission to the European Parliament and the Council on the implementation of the work under the nuclear decommissioning assistance program to Bulgaria, Lithuania and Slovakia in 2015 and previous years); International Atomic Energy Agency (IAEA): Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management; 60. Regular Session of the IAEA General Conference (Resolutions of the Conference, Measures to strengthen international cooperation in nuclear, radiation, transport and waste safety (GC(60)/RES/9): conventions, regulatory frameworks and supporting non-legally-binding instruments for safety, Nuclear installation safety, Safe management of radioactive sources, Nuclear Security (GC(60)/RES/10)); IAEA Treaty Event; Legislative assistance activities; OECD Nuclear Energy Agency (NEA): New member of the Generation IV International Forum; New signatories to the extension of the GIF Framework Agreement; International Framework for Nuclear Energy Cooperation (IFNEC) 'Latin American Nuclear Energy Stakeholders Conference', 25-26 October 2016, Buenos Aires, Argentina; 10. national workshop of the NEA Forum on Stakeholder Confidence (FSC); Symposium on the Fukushima Nuclear Power Plant Accident and Law and Policy, 24-25 September 2016, Tokyo, Japan; Nuclear Law Committee meeting; NEA publications of interest; Regulatory and Institutional Framework for Nuclear Activities; 16. Session of the International School of Nuclear Law (ISNL); 2017 session of the International Nuclear Law Essentials (INLE); Table on Nuclear Operator Liability Amounts and Financial Security Limits

  16. Intergovernmental organisation activities

    International Nuclear Information System (INIS)

    2017-01-01

    This section treats of the following Intergovernmental organisation activities: 1 - European Atomic Energy Community, Non-legally binding instruments: Report on Cyber Security in the Energy Sector; International relations: Memorandum of Understanding on a Strategic Energy Partnership between the European Union together with the European Atomic Energy Community and Ukraine; 2 - International Atomic Energy Agency, Convention on Nuclear Safety (CNS): Seventh Review Meeting of the contracting parties to the CNS; Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management (Joint Convention): Third Extraordinary Meeting of the contracting parties to the Joint Convention; Code of Conduct on the Safety of Research Reactors (Code): Fourth International Meeting on Application of the Code; Convention on the Physical Protection of Nuclear Material (CPPNM) and the CPPNM Amendment: Second Technical Meeting of the representatives of states parties to the CPPNM and the CPPNM Amendment; International Conference on Nuclear Security: Commitments and Actions; Nuclear liability: Seventeenth meeting of the International Expert Group on Nuclear Liability (INLEX), Workshops on Civil Liability for Nuclear Damage; Legislative assistance activities; 3 - OECD Nuclear Energy Agency: Strategic Plan for 2017-2022, Argentina and Romania to become members of the Nuclear Energy Agency, Latest updates regarding the Paris Convention, The NEA and China's National Energy Administration sign MOU to strengthen co-operation, Stakeholder support and involvement essential to future of nuclear energy decision making, Nuclear Law Committee meeting, 2017 International Nuclear Law Essentials (INLE) course, Regulatory and institutional framework for nuclear activities, NEA publications of interest

  17. The role the safety analysis report and other documents in the licensing procedure in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Albrecht, E.; Ballhaus, S.

    1975-01-01

    Legal requirements for the licensing procedure, requirements for and preparation of licensing documents, authorities and experts participating in the licensing procedure, course of the atomic licensing procedure e.g. application for construction and operation, public hearing, site and concept license, partial licenses. (HP) [de

  18. 75 FR 3455 - Union Electric Company dba Ameren/UE; Notice of Application for Amendment of License and...

    Science.gov (United States)

    2010-01-21

    ... located at the Ozark Yacht Club near mile marker 0.8+0.6 in Jennings Branch Cove on the Lake of the Ozarks... of Request: The licensee requests approval to permit Ozark Yacht Club to construct a new 4-slip boat... for use by patrons of the Ozark Yacht Club. l. Locations of the Application: A copy of the application...

  19. 76 FR 40904 - FPL Energy Maine Hydro LLC; Notice of Application for Amendment of License and Soliciting...

    Science.gov (United States)

    2011-07-12

    ... turbine from 34,000 hp (25.5 MW) to 42,400 hp (31.8 MW) and its hydraulic capacity would increase from 2... application. k. Description of Application: The licensee proposes to replace the project's Unit 1 turbine... 27 MW instead of [[Page 40905

  20. 75 FR 66746 - Idaho Power Company and Milner Dam, Inc; Notice of Application for Amendment of License, and...

    Science.gov (United States)

    2010-10-29

    .... Location: The project is located on the Snake River in Twin Falls and Cassia Counties, Idaho. g. Filed... the Upper Snake Water Supply Bank. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First...

  1. 75 FR 61459 - Idaho Power Company and Milner Dam, Inc.; Notice of Application for Amendment of License and...

    Science.gov (United States)

    2010-10-05

    ... located on the Snake River in Twin Falls and Cassia Counties, Idaho. g. Filed Pursuant to: Federal Power.... Locations of the Application: A copy of the application is available for inspection and reproduction at the... reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission's...

  2. 78 FR 75376 - Entergy Operations, Inc.; Combined License Application for River Bend Unit 3, Exemption From the...

    Science.gov (United States)

    2013-12-11

    ...) The exemption(s) are authorized by law, will not present an undue risk to public health or safety, and... only temporary relief from the applicable regulation and the licensee or applicant has made good faith.... ML11343A568), and December 3, 2012 (ADAMS Accession No. ML12342A231), EOI has made good faith efforts to...

  3. 78 FR 75379 - Entergy Operations, Inc.; Combined License Application for Grand Gulf Unit 3; Exemption From the...

    Science.gov (United States)

    2013-12-11

    ... law, will not present an undue risk to public health or safety, and are consistent with the common... applicable regulation and the licensee or applicant has made good faith efforts to comply with the regulation.... ML12342A231), EOI has made good faith efforts to comply with 10 CFR 50.71(e)(3)(iii) prior to requesting...

  4. 77 FR 20622 - N.E.W. Hydro LLC; Notice of Application for Amendment of License and Soliciting Comments, Motions...

    Science.gov (United States)

    2012-04-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2744-041; 2744-042] N.E.W....: 2744-041 & 042. c. Date Filed: March 14, 2012. d. Applicant: N.E.W. Hydro LLC. e. Name of Project.... Description of Application: N.E.W. Hydro LLC seeks approval to construct an angled fish guidance rack with...

  5. Technology licensing in China

    DEFF Research Database (Denmark)

    Wang, Yuandi; Li-Ying, Jason; Chen, Jin

    2015-01-01

    We explore the landscape of technology licensing among Chinese entities in the period 2000–12, using a unique database on technological licensing from the State Intellectual Property Office of China. We find that: first, among Chinese licensee organizations, firms have dominated in terms...... of the number of licensed technologies; second, the geographical distribution of licensed technologies among the provinces has gradually reached a new quantitative balance; third, utility models are the most popular technologies to be licensed and the majority of technology licensing in China has been between...... Chinese entities, and most transactions have been local within provinces; and finally, Chinese firms have gradually in-licensed newer and newer technologies, but the technologies in-licensed from foreign sources are by no means state-of-the-art. We make several suggestions for innovation policy...

  6. State Licenses & Permits

    Data.gov (United States)

    Small Business Administration — Starting a business? Confused about whether you need a business license or permit? Virtually every business needs some form of license or permit to operate legally....

  7. Online driver's license renewal.

    Science.gov (United States)

    2015-09-01

    The Kentucky Department of Vehicle Regulation is exploring the possibility of developing and implementing online : drivers license renewal. The objective of this project was to: 1) evaluate online drivers license and REAL ID renewal : programs ...

  8. Intergovernmental organisation activities

    International Nuclear Information System (INIS)

    2013-01-01

    This section reviews the recent highlights of Intergovernmental organisation activities: - European Atomic Energy Community: Proposal for a Council Directive amending Directive 2009/71/Euratom establishing a Community framework for the nuclear safety of nuclear installations (COM/2013/715 final); Commission Implementing Regulation (EU) No.495/2013 of 29 May 2013 amending Implementing Regulation (EU) No.996/2012 imposing special conditions governing the import of feed and food originating in or consigned from Japan following the accident at the Fukushima nuclear power station; Council Decision of 15 July 2013 authorising certain Member States to ratify, or to accede to, the Protocol amending the Vienna Convention on Civil Liability for Nuclear Damage of 21 May 1963 in the interest of the European Union and to make a declaration on the application of the relevant internal rules of Union law (2013/434/EU); Report from the Commission to the European Parliament, the Council and the Economic and Social Committee on the implementation by the Member States of Council Directive 2006/117/Euratom on the supervision and control of shipments of radioactive waste and spent fuel [COM(2013)240 final]; Commission Decision of 24 June 2013 on granting a Euratom loan in support of the Ukraine safety upgrade program of nuclear power units [C(2013)3496]; Signature of the Agreement between the government of South Africa and the European Atomic Energy Community for co-operation in the peaceful uses of nuclear energy, 18 July 2013; Renewal of the Agreement between the European Atomic Energy Community and the Korean Peninsula Energy Development Organisation (KEDO); Signature of the Memorandum of Understanding for a partnership between the European Atomic Energy Community and the International Atomic Energy Agency on nuclear safety co-operation, 17 September 2013; Commission Decision on the adoption of the Report of the European Atomic Energy Community for the Sixth Review Meeting of

  9. Nuclear power stations licensing

    International Nuclear Information System (INIS)

    Solito, J.

    1978-04-01

    The judicial aspects of nuclear stations licensing are presented. The licensing systems of the United States, Spain, France and Federal Republic of Germany are focused. The decree n 0 60.824 from July 7 sup(th), 1967 and the following legislation which define the systematic and area of competence in nuclear stations licensing are analysed [pt

  10. NRC licensing requirements: DOD options

    International Nuclear Information System (INIS)

    Pike, W.J.; O'Reilly, P.D.

    1982-09-01

    This report describes the licensing process (both safety and environmental) that would apply if the Department of Defense (DOD) chooses to obtain licenses from the US Nuclear Regulatory Commission (NRC) for using nuclear energy for power and luminous sources. The specific nuclear energy sources being considered include: small or medium-size nuclear power reactors; radioisotopic thermoelectric generators with 90 Sr or 238 Pu; radioisotopic dynamic electric generators with 90 Sr or 238 Pu; and applications of radioisotopes for luminous sources (lights) with 3 H, 85 Kr, or 147 Pm. The steps of the licensing process are summarized in the following sections, with particular attention given to the schedule and level of effort necessary to support the process

  11. Den kommunikerende organisation

    DEFF Research Database (Denmark)

    Tække, Jesper

    2006-01-01

    samtidig tilbydes optimale muligheder for at få opfyldt individuelle behov og karrieremuligheder. For at en organisation skal kunne korrigere sig i forhold til de krav den konfronteres med, må der kunne fremstilles et adækvat billede af den. Det vil sige at dens faktiske kommunikationsprocesser må kunne...... drages frem i lyset på en måde så hensigtsmæssigheder og uhensigtsmæssigheder kan iagttages og selv blive objekt for reflekteret organisationskommunikation. Dette paper giver et udkast til en analysestrategi, hvormed der kan tegnes et billede af den enkelte organisation ud fra hvordan dens enkelte og...

  12. Three domains of project organising

    OpenAIRE

    Winch, Graham M.

    2014-01-01

    It has become axiomatic in research on project organising that projects are temporary organisations. Yet there are a number of challenges to this axiom: research on matrix organisation, the embeddedness of projects in project ecologies, and projectification all emphasise the relationship of the project to permanent organisations. Similarly, research on project-based firms and owner organisations which are relatively permanent challenges this axiom. This paper develops a conceptual framework w...

  13. 75 FR 32418 - Notice of Intent To Grant Partially Exclusive License of the United States Patent Application No...

    Science.gov (United States)

    2010-06-08

    ...-1076. FOR FURTHER INFORMATION CONTACT: Ms. Bea Shahin (217) 373-7234, FAX (217) 373-7210, e-mail: Bea.S... applications to achieve increased soil strength, reduced air transport, and decreased soil erosion. During...

  14. 17 CFR 3.40 - Temporary licensing of applicants for associated person, floor broker or floor trader registration.

    Science.gov (United States)

    2010-04-01

    ... has been granted trading privileges by a contract market or derivatives transaction execution facility... officer with respect to the review of an applicant's employment, credit and other history in connection...

  15. IRIS Licensing Status

    International Nuclear Information System (INIS)

    Kling, Charles L.; Carelli, Mario D.

    2006-01-01

    The International Reactor Innovative and Secure (IRIS) nuclear power plant is well into the pre-application review process with the US NRC and has accomplished its first near term goal of obtaining US NRC feedback on the long term testing program. To date, the IRIS team has submitted to the US NRC a number of documents patterned after the Evaluation Model Development and Assessment Process (EMDAP) outlined in Regulatory Guide 1,203. They have covered a detailed description of IRIS, initial safety analysis results, PIRT development for limiting transients, scaling analysis and a description of the test program. The IRIS Safety-by-Desing TM intrinsically eliminates and/or significantly reduces the consequences of traditional LWR accidents. In addition, the fewer passive safety systems are similar in principle to those of the US NRC approved AP1000 design. For these reasons, the IRIS testing program only needs to include those features unique to the IRIS design. NRC feedback was that the planned test program appeared to be complete and could generate sufficient information to support a Design Certification (DC) submittal. The US NRC has also stated that a DC application must include complete information regarding the test program. On this basis the IRIS team has initiated an aggressive program to conduct IRIS testing to support a DC submittal by the end of 2008. Subsequent US NRC review should be expeditious because of the AP1000 precedent, allowing IRIS to obtain its Final Design Approval (FDA) in 2012; thereby, maintaining its goal of deployment in the 2015-2017 time frame. The next steps in the pre-application review process will be to provide the US NRC with a road map of the anticipated IRIS licensing process, a review of current licensing requirements showing that IRIS meets or exceeds all current criteria and information to support the long term goal of redefining the Emergency Planning Zone (EPZ)

  16. Nuclear reactor operator licensing

    International Nuclear Information System (INIS)

    Bursey, R.J.

    1978-01-01

    The Atomic Energy Act of 1954, which was amended in 1974 by the Energy Reorganization Act, established the requirement that individuals who had the responsibility of operating the reactors in nuclear power plants must be licensed. Section 107 of the act states ''the Commission shall (1) prescribe uniform conditions for licensing individuals; (2) determine the qualifications of such individuals; and (3) issue licenses to such individuals in such form as the Commission may prescribe.'' The article discusses the types of licenses, the selection and training of individuals, and the administration of the Nuclear Regulatory Commission licensing examinations

  17. Sustainable building organisation

    NARCIS (Netherlands)

    Schmid, P.

    1998-01-01

    Sustainable Development and Sustainable Building is mainly a question of (human) environmentally-conscious Organisation and Management Criteria are needed in order to capture the best practices in the field. Therefore we developed modells and methods, which help to choose the most adequate

  18. Cultures et organisations

    NARCIS (Netherlands)

    Hofstede, G.; Hofstede, G.J.; Minkov, M.

    2010-01-01

    La coopération interculturelle, une question de survie Véritable atlas des valeurs culturelles, paru en 18 langues, Cultures et organisations est le fruit de plus de 40 ans de recherches menées dans plus de 100 pays. Il est aujourd'hui le livre de référence des chercheurs, universitaires et

  19. CERT in the organisation

    NARCIS (Netherlands)

    Tolido, R.; Borsoi, P.; Bronk, H.; Elsinga, B.; Greuter, R.; Hafkamp, W.H.M.; Jochem, A.; van der Heide, M.; Rorive, K.; Schiltmans, T.; Schuurman, J.; Reijers, R.

    This Expert Letter deals with the increasingly important phenomenon of in-house Computer Emergency Response Teams (CERTs). The number of internal CERTs in larger, commercial organisations has increased rapidly in the past few years. This is mainly in response to the painful security incidents that

  20. Luhmann og Organisation

    DEFF Research Database (Denmark)

    Paulsen, Michael

    LUHMANN OG ORGANISATION Organisationsstudier spiller en særlig rolle for den tyske sociolog Niklas Luhmann (1927-1998) idet han begriber organisationer som det mest afgørende socialsystem i det moderne samfund. Kun organisati-oner kan træffe samfundsmæssige afgørelser. Faktisk begyndte Luhmann som...... organisationsteoretiker, og flere af hans tidlige værker regnes nu som milepæle indenfor organisations-studier. I 2000 udkom post humt hans sidste store organisationsteoretiske værk Organisation und Entscheidung. I Luhmanns almene systemteori trækker han kraftigt på sit kendskab til organisationer. Begribelsen af...... samtidig med, at de kan skabe en kobling mellem det moderne samfunds interaktioner og funktionssystemer. Luhmanns konstante ledetråd har været, at organisationer er det, som får samfun-det til at fungere. Uden organisationer intet moderne samfund. Luhmann og organisation henvender sig til studerende...