WorldWideScience

Sample records for landlord project multi-year

  1. Landlord project multi-year program plan, fiscal year 1999, WBS 1.5

    Energy Technology Data Exchange (ETDEWEB)

    Dallas, M.D.

    1998-09-22

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The mission of Landlord Project is to provide more maintenance replacement of general infrastructure facilities and systems to facilitate the Hanford Site cleanup mission. Also, once an infrastructure facility or system is no longer needed the Landlord Project transitions the facility to final closure/removal through excess, salvage or demolition. Landlord Project activities will be performed in an environmentally sound, safe, economical, prudent, and reliable manner. The Landlord Project consists of the following facilities systems: steam, water, liquid sanitary waste, electrical distribution, telecommunication, sanitary landfill, emergency services, general purpose offices, general purpose shops, general purpose warehouses, environmental supports facilities, roads, railroad, and the site land. The objectives for general infrastructure support are reflected in two specific areas, (1) Core Infrastructure Maintenance, and (2) Infrastructure Risk Mitigation.

  2. Landlord Program multi-year program plan fiscal year 1995 WBS 7.5

    International Nuclear Information System (INIS)

    Young, C.L.

    1994-01-01

    The Landlord Program mission is to maintain, preserve, or upgrade the strategic assets of the Hanford Site to meet the overall cleanup mission. This encompasses innovative, appropriate, and cost effective general purpose infrastructure support, services, and long range strategic site planning that is the foundation for seven major Hanford programs. These programs are (1) Environmental Restoration, (2) Tank Waste Remediation System, (3) Solid/Liquid Waste Decontamination, (4) Facility Transition, (5) Spent Fuel, (6) Technology Development, and (7) the Multi-Program Laboratory. General infrastructure support consists of facilities, systems, and equipment that by design or use are not essentially dedicated to a single program mission. Facilities include laboratories, shops, warehouses, and general work space. Systems include electrical, process sewers, rail, roads, telecommunications, water, fire and emergency response, and steam supply and distribution. Funding also supports capital equipment critical to maintaining, upgrading, or operating the general infrastructure. Paramount to these objectives is compliance with all applicable laws, orders, agreements, codes, standards, best management and safety practices. The objectives for general infrastructure support are reflected in five programmatic functions, (1) Program Integration, (2) Capital Equipment, (3) Expense Funded Projects, (4) General Plant Projects, and (5) Line Items

  3. River Protection Project FY 2000 Multi Year Work Plan Summary

    International Nuclear Information System (INIS)

    LENSEIGNE, D.L.

    1999-01-01

    The River Protection Project (RPP), formerly the Tank Waste Remediation System (TWRS), is a major part of the U.S. Department of Energy's (DOE) Office of River Protection (ORP). The ORP was established as directed by Congress in Section 3139 of the Strom Thurmond National Defense Authorization Act for Fiscal Year (FY) 1999. The ORP was established to elevate the reporting and accountability for the RPP to the DOE-Headquarters level. This was done to gain Congressional visibility and obtain support for a major $10 billion high-level liquid waste vitrification effort

  4. Spent nuclear fuel project multi-year work plan WBS number 1.4.1

    International Nuclear Information System (INIS)

    Wells, J.L.

    1997-01-01

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency

  5. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  6. Spent nuclear fuel project multi-year work plan WBS {number_sign}1.4.1

    Energy Technology Data Exchange (ETDEWEB)

    Wells, J.L.

    1997-03-01

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency.

  7. Waste management project fiscal year 1998 multi-year work plan WBS 1.2

    International Nuclear Information System (INIS)

    Slaybaugh, R.R.

    1997-08-01

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project

  8. Systems engineering aspects to installation of the phased multi-year LANSCE-refurbishment project

    International Nuclear Information System (INIS)

    Pieck, Martin; Erickson, John E.; Gulley, Mark S.; Jones, Kevin W.; Rybarcyk, Larry J.

    2009-01-01

    The LANSCE Refurbishment Project (LANSCE-R) is a phased, multiyear project. The project is scheduled to start refurbishment in the 2nd quarter of fiscal year 2011. Closeout will occur during the 4th quarter of FY2016. During the LANSCE-R project, installation of project components must be scheduled during six annual 6-month maintenance-outages and not conflict with annual LANSCE operational commitments to its user facilities. The project and operations schedules must be synchronized carefully. Therefore, the scheduled maintenance outages, functional testing (with beam off, by primarily project personnel) and commissioning (with beam on, by primarily Accelerator Operation Technology (AOT) personnel) must be managed to accommodate operation. Active and effective coordination and communication between the project and AOT personnel must be encouraged to identify, as early as possible, any operational issues. This paper will report on the systems engineering approach to the integration and control of engineering activities.

  9. Waste management project fiscal year 1998 multi-year work plan WBS 1.2

    Energy Technology Data Exchange (ETDEWEB)

    Slaybaugh, R.R.

    1997-08-29

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project.

  10. Waste Management Project fiscal year 1998 multi-year work plan, WBS 1.2

    International Nuclear Information System (INIS)

    Jacobsen, P.H.

    1997-01-01

    The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible

  11. Role of Landlords in Creating Healthy Homes: Section 8 Landlord Perspectives on Healthy Housing Practices.

    Science.gov (United States)

    Polletta, Valerie L; Reid, Margaret; Barros, Eugene; Duarte, Catherine; Donaher, Kevin; Wensley, Howard; Wolff, Lisa

    2017-11-01

    This article presents qualitative research findings of Section 8 landlord perceptions regarding healthy housing practices to inform landlord-focused initiatives. Approach or Design: Five focus groups were conducted with landlords. Boston, Massachusetts. Section 8 landlords participated in focus groups (n = 39). Focus group transcripts were coded for key themes using a grounded theory approach. Landlords' primary challenges to creating a healthy housing environment included tenant behavior, financial burden, and policy enforcement; tenant safety and cost savings were seen as primary benefits. Landlords play a critical role in implementing healthy housing practices. Several opportunities exist to reduce barriers and capitalize on perceived benefits of implementing these practices, including increasing access to educational and financial resources.

  12. Health Complaints Associated with Poor Rental Housing Conditions in Arkansas: The Only State without a Landlord's Implied Warranty of Habitability.

    Science.gov (United States)

    Bachelder, Ashley E; Stewart, M Kate; Felix, Holly C; Sealy, Neil

    2016-01-01

    Arkansas is the only U.S. state that does not have a landlord's implied warranty of habitability, meaning tenants have a requirement for maintaining their rental properties at certain habitability standards, but landlords are not legally required to contribute to those minimum health and safety standards. This project assessed the possibility that this lack of landlord responsibility affects tenants' perceived health. Using surveys and interviews, we collected self-reported data on the prevalence and description of problems faced by renters who needed household repairs from their landlords. Of almost 1,000 renters, one-third of them had experienced a problem with their landlord making needed repairs; and one-quarter of those had a health issue they attributed to their housing conditions. Common issues included problems with plumbing, heating, or cooling systems, and pest or rodent control. Reported health problems included elevated stress levels, breathing problems, headaches, high blood pressure, and bites or infections. Hispanic respondents and those with less than a high school education were both significantly more likely to report problems with their landlords not making repairs as requested. These data suggest that the lack of landlord requirements may negatively impact the condition of rental properties and, therefore, may negatively impact the health of Arkansas renters.

  13. Spent Nuclear Fuel Project FY 1996 Multi-Year Program Plan WBS No. 1.4.1, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This document describes the Spent Nuclear Fuel (SNF) Project portion of the Hanford Strategic Plan for the Hanford Reservation in Richland, Washington. The SNF Project was established to evaluate and integrate the urgent risks associated with N-reactor fuel currently stored at the Hanford site in the K Basins, and to manage the transfer and disposition of other spent nuclear fuels currently stored on the Hanford site. An evaluation of alternatives for the expedited removal of spent fuels from the K Basin area was performed. Based on this study, a Recommended Path Forward for the K Basins was developed and proposed to the U.S. DOE

  14. Spent Nuclear Fuel Project FY 1996 Multi-Year Program Plan WBS No. 1.4.1, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document describes the Spent Nuclear Fuel (SNF) Project portion of the Hanford Strategic Plan for the Hanford Reservation in Richland, Washington. The SNF Project was established to evaluate and integrate the urgent risks associated with N-reactor fuel currently stored at the Hanford site in the K Basins, and to manage the transfer and disposition of other spent nuclear fuels currently stored on the Hanford site. An evaluation of alternatives for the expedited removal of spent fuels from the K Basin area was performed. Based on this study, a Recommended Path Forward for the K Basins was developed and proposed to the U.S. DOE.

  15. THE YOUNG SOLAR ANALOGS PROJECT. I. SPECTROSCOPIC AND PHOTOMETRIC METHODS AND MULTI-YEAR TIMESCALE SPECTROSCOPIC RESULTS

    Energy Technology Data Exchange (ETDEWEB)

    Gray, R. O.; Briley, M. M.; Lambert, R. A.; Fuller, V. A.; Newsome, I. M.; Seeds, M. F. [Department of Physics and Astronomy, Appalachian State University, Boone, NC 26808 (United States); Saken, J. M.; Kahvaz, Y. [Department of Physics and Physical Science, Marshall University, Huntington, WV 25755 (United States); Corbally, C. J. [Vatican Observatory Research Group, Steward Observatory, Tucson, AZ 85721-0065 (United States)

    2015-12-15

    This is the first in a series of papers presenting methods and results from the Young Solar Analogs Project, which began in 2007. This project monitors both spectroscopically and photometrically a set of 31 young (300–1500 Myr) solar-type stars with the goal of gaining insight into the space environment of the Earth during the period when life first appeared. From our spectroscopic observations we derive the Mount Wilson S chromospheric activity index (S{sub MW}), and describe the method we use to transform our instrumental indices to S{sub MW} without the need for a color term. We introduce three photospheric indices based on strong absorption features in the blue-violet spectrum—the G-band, the Ca i resonance line, and the Hydrogen-γ line—with the expectation that these indices might prove to be useful in detecting variations in the surface temperatures of active solar-type stars. We also describe our photometric program, and in particular our “Superstar technique” for differential photometry which, instead of relying on a handful of comparison stars, uses the photon flux in the entire star field in the CCD image to derive the program star magnitude. This enables photometric errors on the order of 0.005–0.007 magnitude. We present time series plots of our spectroscopic data for all four indices, and carry out extensive statistical tests on those time series demonstrating the reality of variations on timescales of years in all four indices. We also statistically test for and discover correlations and anti-correlations between the four indices. We discuss the physical basis of those correlations. As it turns out, the “photospheric” indices appear to be most strongly affected by emission in the Paschen continuum. We thus anticipate that these indices may prove to be useful proxies for monitoring emission in the ultraviolet Balmer continuum. Future papers in this series will discuss variability of the program stars on medium (days–months) and short

  16. Spent nuclear fuels project: FY 1995 multi-year program plan, WBS {number_sign}1.4

    Energy Technology Data Exchange (ETDEWEB)

    Denning, J.L.

    1994-09-01

    The mission of the Spent Nuclear Fuel (SNF) program is to safely, reliably, and efficiently manage, condition, transport, and store Department of Energy (DOE)-owned SNF, so that it meets acceptance criteria for disposal in a permanent repository. The Hanford Site Spent Nuclear Fuel strategic plan for accomplishing the project mission is: Establish near-term safe storage in the 105-K Basins; Complete national Environmental Policy Act (NEPA) process to obtain a decision on how and where spent nuclear fuel will be managed on the site; Define and establish alternative interim storage on site or transport off site to support implementation of the NEPA decision; and Define and establish a waste package qualified for final disposition. This report contains descriptions of the following: Work Breakdown Structure; WBS Dictionary; Responsibility Assignment Matrix; Program Logic Diagrams; Program Master Baseline Schedule; Program Performance Baseline Schedule; Milestone List; Milestone Description Sheets; Cost Baseline Summary by Year; Basis of Estimate; Waste Type Data; Planned Staffing; and Fiscal Year Work Plan.

  17. Spent nuclear fuels project: FY 1995 multi-year program plan, WBS number-sign 1.4

    International Nuclear Information System (INIS)

    Denning, J.L.

    1994-09-01

    The mission of the Spent Nuclear Fuel (SNF) program is to safely, reliably, and efficiently manage, condition, transport, and store Department of Energy (DOE)-owned SNF, so that it meets acceptance criteria for disposal in a permanent repository. The Hanford Site Spent Nuclear Fuel strategic plan for accomplishing the project mission is: Establish near-term safe storage in the 105-K Basins; Complete national Environmental Policy Act (NEPA) process to obtain a decision on how and where spent nuclear fuel will be managed on the site; Define and establish alternative interim storage on site or transport off site to support implementation of the NEPA decision; and Define and establish a waste package qualified for final disposition. This report contains descriptions of the following: Work Breakdown Structure; WBS Dictionary; Responsibility Assignment Matrix; Program Logic Diagrams; Program Master Baseline Schedule; Program Performance Baseline Schedule; Milestone List; Milestone Description Sheets; Cost Baseline Summary by Year; Basis of Estimate; Waste Type Data; Planned Staffing; and Fiscal Year Work Plan

  18. Transition projects, Fiscal Year 1996: Multi-Year Program Plan (MYPP) for WBS 1.31, 7.1, and 6.13. Revision 1, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Cartmell, D.B.

    1995-09-01

    Based on US Department of Energy (DOE), Richland Operations Office (RL) review, specific areas of Westinghouse Hanford Company (WHC), Transition Projects ``Draft`` Multi-Year Program Plan (MYPP) were revised in preparation for the RL approval ceremony on September 26, 1995. These changes were reviewed with the appropriate RL Project Manager. The changes have been incorporated to the MYPP electronic file, and hard copies replacing the ``Draft`` MYPP will be distributed after the formal signing. In addition to the comments received, a summary level schedule and outyear estimates for the K Basin deactivation beginning in FY 2001 have been included. The K Basin outyear waste data is nearing completion this week and will be incorporated. This exclusion was discussed with Mr. N.D. Moorer, RL, Facility Transition Program Support/Integration. The attached MYPP scope/schedule reflects the Integrated Target Case submitted in the April 1995 Activity Data Sheets (ADS) with the exception of B Plant and the Plutonium Finishing Plant (PFP). The 8 Plant assumption in FY 1997 reflects the planning case in the FY 1997 ADS with a shortfall of $5 million. PFP assumptions have been revised from the FY 1997 ADS based on the direction provided this past summer by DOE-Headquarters. This includes the acceleration of the polycube stabilization back to its originally planned completion date. Although the overall program repricing in FY 1996 allowed the scheduled acceleration to fall with the funding allocation, the FY 1997 total reflects a shortfall of $6 million.

  19. Transition projects, Fiscal Year 1996: Multi-Year Program Plan (MYPP) for WBS 1.31, 7.1, and 6.13. Revision 1, Volume 1

    International Nuclear Information System (INIS)

    Cartmell, D.B.

    1995-09-01

    Based on US Department of Energy (DOE), Richland Operations Office (RL) review, specific areas of Westinghouse Hanford Company (WHC), Transition Projects ''Draft'' Multi-Year Program Plan (MYPP) were revised in preparation for the RL approval ceremony on September 26, 1995. These changes were reviewed with the appropriate RL Project Manager. The changes have been incorporated to the MYPP electronic file, and hard copies replacing the ''Draft'' MYPP will be distributed after the formal signing. In addition to the comments received, a summary level schedule and outyear estimates for the K Basin deactivation beginning in FY 2001 have been included. The K Basin outyear waste data is nearing completion this week and will be incorporated. This exclusion was discussed with Mr. N.D. Moorer, RL, Facility Transition Program Support/Integration. The attached MYPP scope/schedule reflects the Integrated Target Case submitted in the April 1995 Activity Data Sheets (ADS) with the exception of B Plant and the Plutonium Finishing Plant (PFP). The 8 Plant assumption in FY 1997 reflects the planning case in the FY 1997 ADS with a shortfall of $5 million. PFP assumptions have been revised from the FY 1997 ADS based on the direction provided this past summer by DOE-Headquarters. This includes the acceleration of the polycube stabilization back to its originally planned completion date. Although the overall program repricing in FY 1996 allowed the scheduled acceleration to fall with the funding allocation, the FY 1997 total reflects a shortfall of $6 million

  20. Decision project related to the energy multi-year 2018/2023 planning (PPE). Evolution of capacities of production of power generating renewable energies: the headlong rush

    International Nuclear Information System (INIS)

    Perves, Jean-Pierre

    2016-01-01

    After having recalled that the French government, in its energy multi-year planning for 2018-2023, decided to develop wind and photovoltaic energies at a higher rate, despite their intermittency and the need for back-up nuclear and hydroelectric power plants (which do not emit carbon), and outlined that the power market is now in the torment, in France and in Europe, the author notices that such a development of renewable energies is a matter of concern in Europe, and indicates the objectives defined by the French government for onshore and offshore wind energy and for solar energy. Then, he proposes a critical analysis of the low level scenario of this development, a scenario which the author assesses as not very realistic. A table indicates the status and objectives for all the different renewable energies. The author discusses these values, notices that it is similar to a programme defined by the ADEME. He analyses the 2018/2023 low scenario (production, share, production efficiency, minimum and maximum power) by comparing it with the situation in 2015. He outlines important seasonal variations for wind and solar energy: their production level in winter requires a massive use of other sources. He briefly discusses the perspectives for 2030, and then addresses the development cost in terms of required investments. He discusses the impact of the scenario on greenhouse gas emissions. The appendix provides the official text of the decision project

  1. Improving Property to the Benefit of Both Landlords and Tenants

    DEFF Research Database (Denmark)

    Juul-Sandberg, Jakob

    the result of this is that property owners (landlords) have many obligations but only little motivation on improving the standards of the property as the return on such investments is very low. This is mainly due to the fact that amounts spent on energy saving measures or other improvements to a building...

  2. Transition projects FY 1995 multi-year program/fiscal year work plan WBS 1.3.1. and 7.1

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The primary Transition Projects mission is to deactivate facilities on the Hanford site, in preparation for decontamination and decommissioning, and secondarily to provide safe and secure storage of special nuclear materials, nuclear materials, and nuclear fuel. Transition projects will protect the health and safety of the public and of workers, protect the environment, and provide beneficial use of the facilities and other resources. Goals include the following: Achieve deactivation of facilities for transfer to the Hanford Surplus Facility Program, suing PUREX plant deactivation as a model; Achieve excellence in the conduct of operations and maintenance of nuclear facilities in support of the Hanford Site Mission; manage nuclear materials in a safe and secure condition; treat nuclear materials as necessary and store onsite in long-term interim safe storage awaiting a final disposition decision. Description of the program and projects is included.

  3. Transition projects FY 1995 multi-year program/fiscal year work plan WBS 1.3.1. and 7.1

    International Nuclear Information System (INIS)

    1994-09-01

    The primary Transition Projects mission is to deactivate facilities on the Hanford site, in preparation for decontamination and decommissioning, and secondarily to provide safe and secure storage of special nuclear materials, nuclear materials, and nuclear fuel. Transition projects will protect the health and safety of the public and of workers, protect the environment, and provide beneficial use of the facilities and other resources. Goals include the following: Achieve deactivation of facilities for transfer to the Hanford Surplus Facility Program, suing PUREX plant deactivation as a model; Achieve excellence in the conduct of operations and maintenance of nuclear facilities in support of the Hanford Site Mission; manage nuclear materials in a safe and secure condition; treat nuclear materials as necessary and store onsite in long-term interim safe storage awaiting a final disposition decision. Description of the program and projects is included

  4. Sustainable renovation of residential buildings and the landlord/tenant dilemma

    International Nuclear Information System (INIS)

    Ástmarsson, Björn; Jensen, Per Anker; Maslesa, Esmir

    2013-01-01

    The landlord/tenant dilemma arises when the interests of landlords and tenants misalign and is one of the greatest barriers hindering the development of sustainable renovation of residential buildings in Europe. The aim of this research is to investigate how regulatory changes and contractual solutions can help solve the landlord/tenant dilemma in relation to sustainable renovation of residential buildings, and how the general awareness of sustainable renovation can be increased. Particular focus is on whether tools like energy performance contracting and energy labeling can help solve the landlord/tenant dilemma. The research was done in relation to the specific situation in Denmark, but theory, information and experiences from other countries were included. The results show that there are plenty of opportunities to overcome the landlord/tenant dilemma, but principal/agent problems can only be overcome with a package solution. In the Danish national context the package solution must consist of legislative changes, financial incentives and better dissemination of information. Therefore, an array of different tools must be integrated and used in cooperation to overcome the dilemma. - Highlights: • There are plenty of opportunities to overcome the landlord/tenant dilemma. • The principal/agent problems can only be overcome with a package solution. • An array of different tools must be integrated and used in cooperation. • Legislative changes, financial incentives and better dissemination of information

  5. Malaria, Tarai Adivasi and the Landlord State in the 19th century Nepal: A Historical-Ethnographic Analysis

    Directory of Open Access Journals (Sweden)

    Janak Rai

    2014-05-01

    Full Text Available This paper examines the interplay between malaria, the Tarai Adivasi and the extractive landlord state in the 19th century Nepal by focusing on Dhimal, one indigenous community from the easternmost lowlands. Throughout the 19th century, the Nepali state and its rulers treated the Tarai as a state geography of extraction for land, labor, revenue and political control. The malarial environment of the Tarai, which led to the shortage people (labor force, posed a major challenge to the 19th  century extractive landlord state and the landowning elites to materialize the colonizing project in the Tarai. The shortage of labor added pressure on the malaria resistant Tarai Adivasi to reclaim and cultivate land for the state. The paper highlights the need for ethnographically informed social history of malaria in studying the changing relations between the state and the ?div?si communities in the Tarai DOI: http://dx.doi.org/10.3126/dsaj.v7i0.10438 Dhaulagiri Journal of Sociology and Anthropology Vol. 7, 2013; 87-112

  6. Sustainable Renovation of Residential Buildings and the Landlord/Tenant Dilemma

    DEFF Research Database (Denmark)

    Ástmarsson, Björn; Jensen, Per Anker; Maslesa, Esmir

    2013-01-01

    solutions can help solve the landlord/tenant dilemma in relation to sustainable renovation of residential buildings, and how the general awareness of sustainable renovation can be increased. Particular focus is on whether tools like energy performance contracting and energy labeling can help solve......The landlord/tenant dilemma arises when the interests of landlords and tenants misalign and is one of the greatest barriers hindering the development of sustainable renovation of residential buildings in Europe. The aim of this research is to investigate how regulatory changes and contractual...... be overcome with a package solution. In the Danish national context the package solution must consist of legislative changes, financial incentives and better dissemination of information. Therefore, an array of different tools must be integrated and used in cooperation to overcome the dilemma....

  7. Landlords and Tenants in Conflict. Instructor's Guide [and] Student Materials. Business Issues in the Classroom. Revised.

    Science.gov (United States)

    Maxey, Phyllis F.; Klener, Lois

    One of a series of units on business issues designed for secondary school students, this packet focuses on the landlord-tenant relationship as it is affected by political and economic forces. A teacher's guide and student materials are provided in two separate sections. Following an overview of objectives and activities, the teacher's guide…

  8. Landlordism, Rent Regulation and the Labour Party in mid-twentieth century Britain, 1950-64.

    Science.gov (United States)

    Child, Phil

    2018-03-01

    This article examines the politics of private renting in 1950s and early 1960s Britain, through the radical approach taken by Labour Party towards private landlords. Through setting the radical aims of Labour in a mid-twentieth-century context of decrepit housing, rising rents and sluggish public housing programmes, Labour's rationale in arguing for the 'abolition' of the private landlord is more transparent. This article takes a chronological approach, investigating what actions Labour actors took, at local and national level, and what effect this had on the wider housing market. Part one takes a long view of Labour attitudes to the private rented sector. Part two explores the policy of 'municipalization'-the attempt to place rented homes under local authority control. Part three discusses the post-1962 policy shift to state-sponsored 'improvement' of private rented housing, prior to Labour's victory at the 1964 general election. Three key arguments are made: that Labour's radicalism hastened the collapse of the post-war private rented sector; that rental market weaknesses indicated the confused place of renting in the 'tenurial pattern'; and that the proposed 'abolition' of private landlords had a direct effect on slum clearance and the composition of British cities. The conclusion suggests that Labour's pursuit of the private landlord can shed light on the vast urban transformations of the post-war period. It invites greater attention to be paid to the effects that political ideas had on the composition of the twentieth-century British housing market.

  9. Attitudes and behaviours of private sector landlords towards the energy efficiency of tenanted homes

    International Nuclear Information System (INIS)

    Hope, Alexander John; Booth, Alexander

    2014-01-01

    The UK's housing stock generates approximately 27% of the country's total annual carbon emissions. In light of the legally binding targets to reduce carbon emissions, new housing is subject to a tightening of regulations governing energy demand and efficiency resulting in a gradual improvement in carbon emissions. The question is how to achieve the deep carbon emission reductions from existing domestic properties, of which 75% will still be in use in 2050. Government has sought to provide incentives to homeowners to improve the energy efficiency of their households, and mandate improvements in socially rented housing using a range of fiscal measures, most recently the ‘Green Deal’. There has however been little consideration of the 18% of UK households who privately rent their home, a tenure that is growing fast. The aim of this research is to investigate the factors that influence private sector landlords when considering energy efficiency improvements to their tenanted homes. The results indicate that government policy has consistently failed to engage private sector landlords in the issue of energy efficiency and thus measures must be taken to understand the motivations of landlords in order to design effective incentives and interventions. - Highlights: • Attitudes of private sector landlords to energy efficiency in their tenanted homes are analysed. • Reports on the actions taken by private landlords to improve energy efficiency. • Privately rented homes poorly performing in terms of energy performance. • The private rented sector is disengaged with the issue of housing energy performance. • Current government initiatives such as Green Deal offer little incentive for improvements

  10. Natural Gas Multi-Year Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    This document comprises the Department of Energy (DOE) Natural Gas Multi-Year Program Plan, and is a follow-up to the `Natural Gas Strategic Plan and Program Crosscut Plans,` dated July 1995. DOE`s natural gas programs are aimed at simultaneously meeting our national energy needs, reducing oil imports, protecting our environment, and improving our economy. The Natural Gas Multi-Year Program Plan represents a Department-wide effort on expanded development and use of natural gas and defines Federal government and US industry roles in partnering to accomplish defined strategic goals. The four overarching goals of the Natural Gas Program are to: (1) foster development of advanced natural gas technologies, (2) encourage adoption of advanced natural gas technologies in new and existing markets, (3) support removal of policy impediments to natural gas use in new and existing markets, and (4) foster technologies and policies to maximize environmental benefits of natural gas use.

  11. Government regulation versus market orientation in social housing management : Limitations and opportunities of European and Australian landlords

    NARCIS (Netherlands)

    Nieboer, N.; Gruis, V.H.

    2005-01-01

    In the past ten to twenty years, governments in various countries have introduced or reinforced market principles in their housing systems. As a consequence, social landlords have increased opportunities to adopt a more market-oriented approach towards the management of their housing stock.

  12. The regulation of social housing outcomes : A micro examination of Dutch and Austrian social landlords since financing reforms

    NARCIS (Netherlands)

    Lawson, J.M.; Nieboer, N.

    2009-01-01

    Since the 1990s, significant changes affecting financial arrangements have permeated both the Dutch and Austrian system of social housing provision. Potentially, these changes could have influenced the role and performance of social landlords in both countries. This paper explores the actual impact

  13. "Pets Negotiable": How Do the Perspectives of Landlords and Property Managers Compare with Those of Younger Tenants with Dogs?

    Science.gov (United States)

    Graham, Taryn M; Milaney, Katrina J; Adams, Cindy L; Rock, Melanie J

    2018-02-27

    Previous research has shown that housing insecurity contributes to animal relinquishment and that tenants with dogs face disadvantages in the rental market. Still, little is known about how dog owners navigate rental markets, nor how landlords and property managers perceive dogs and other pets. This case study reports on in-depth interviews with younger tenants with dogs and on open-ended survey responses from landlords and property managers. In their housing searches, tenants with dogs reported feeling powerless in negotiations and feeling discriminated against. They described settling for substandard properties, often located in less desirable neighborhoods. Also, some said they felt obliged to stay put in these rentals, given how difficult it had been to find a place that would accommodate their dogs. Meanwhile, landlords and property managers indicated that listings advertised as "pet-friendly" tend to receive more applicants than listings in which pets are prohibited. Suggestions for improvement included meeting pets prior to signing the lease; getting everything in writing; steering clear from furnished units; charging utilities to tenants; and speeding up the pet approval process when dealing with condominium boards. These suggestions offer implications for future research, partnerships, and policy options to improve the prospects of pets and their people in rental housing.

  14. Multi-Year SSL Market Development Support Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ledbetter, Marc R.

    2012-05-01

    work closely with lighting industry organizations 'such as the Next Generation Lighting Industry Alliance, North American Illuminating Engineering Society, and the International Association of Lighting Designers' and with other government programs seeking to improve lighting energy efficiency. While DOE will work closely with these organizations and others from lighting and electric utility industry, the program will focus primarily on assisting buyers of SSL products and others acting on their behalf because satisfied buyers are essential to the success of SSL market adoption. The work product of DOE's efforts will primarily be information, of the right type, at the right time, and provided efficiently to those who can best use it. A secondary work product of DOE's program will be market opportunities, in which DOE will seek to reduce the risks and costs for manufacturers of SSL products to sell good quality, high performance products to motivated buyers. In short, DOE plans to implement a multi-year program that produces highly useful and widely available information for buyers and their agents, while producing important market opportunities for producers, avoids the mistakes of the past, and is closely coordinated with industry and government. The market needs and the overall strategy were used for deciding which types of programs and projects DOE should create, and what general form they should take. Progress toward achieving plan goals with the above program elements will be monitored and periodically reported.

  15. Multi-Year Program Plan - Building Regulatory Programs

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2010-10-01

    This document presents DOE’s multi-year plan for the three components of the Buildings Regulatory Program: Appliance and Equipment Efficiency Standards, ENERGY STAR, and the Building Energy Codes Program. This document summarizes the history of these programs, the mission and goals of the programs, pertinent statutory requirements, and DOE’s 5-year plan for moving forward.

  16. Bioenergy Technologies Office Multi-Year Program Plan: July 2014

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-07-09

    This is the May 2014 Update to the Bioenergy Technologies Office Multi-Year Program Plan, which sets forth the goals and structure of the Office. It identifies the research, development, demonstration, and deployment activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation.

  17. Multi-Year Program Plan 2011-2015

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2010-12-01

    The Vehicle Technologies Multi-Year Program Plan, FY 2011 – 2015, outlines the scientific research and technologies developments for the five-year timeframe (beyond the FY 2010 base year) that need to be undertaken to help meet the Administration's goals for reductions in oil consumption and carbon emissions from the ground transport vehicle sector of the economy.

  18. Multi-year expansion planning of large transmission networks

    Energy Technology Data Exchange (ETDEWEB)

    Binato, S; Oliveira, G C [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This paper describes a model for multi-year transmission network expansion to be used in long-term system planning. The network is represented by a linearized (DC) power flow and, for each year, operation costs are evaluated by a linear programming (LP) based algorithm that provides sensitivity indices for circuit reinforcements. A Backward/Forward approaches is proposed to devise an expansion plan over the study period. A case study with the southeastern Brazilian system is presented and discussed. (author) 18 refs., 5 figs., 1 tab.

  19. Analysis of 44 Cases before the Landlord and Tenant Board Involving Bed Bug Infestations in Ontario, Canada: Focus on Adjudicator Decisions Based on Entomological/Pest Management Evidence and Accountability under the Residential Tenancy Act and Other Applicable Legislation

    Science.gov (United States)

    Bryks, Sam

    2011-01-01

    The resurgence of bed bugs in major urban centres in North America has resulted in conflict between landlords and tenants. This is commonly focused on attribution of blame for source of infestation, on responsibility, on costs for preparation, treatment and losses, and for compensation as rent abatement and/or alternative temporary housing. In Ontario, Canada, these issues are often decided by adjudicators at the Landlord and Tenant Board hearing claims, counter-claims and defense by legal representation (lawyers and paralegals) as well as through mediation. Evidence in these hearings may include photographs, invoices for costs as well as testimony by tenants, landlords and “expert witnesses” who are most often pest control firms representing their landlord clients. A total of 44 Landlord and Tenant Board adjudicated cases available online were analyzed. The analysis included elements of the decisions such as adjudicator, claimant (landlord or tenant), basis of claim, review of evidence, amount of claim, amount awarded, and evaluation of the quality of the evidence. The results of the analysis of these findings are discussed. Recommendations for improvement of adjudicator decisions on the basis of knowledge of bed bug biology and Integrated Pest Management best practices are presented as well as the importance of education of tenants and landlords to a process of mutual trust, support and accountability. PMID:26467732

  20. Analysis of 44 Cases before the Landlord and Tenant Board Involving Bed Bug Infestations in Ontario, Canada: Focus on Adjudicator Decisions Based on Entomological/Pest Management Evidence and Accountability under the Residential Tenancy Act and Other Applicable Legislation.

    Science.gov (United States)

    Bryks, Sam

    2011-07-19

    The resurgence of bed bugs in major urban centres in North America has resulted in conflict between landlords and tenants. This is commonly focused on attribution of blame for source of infestation, on responsibility, on costs for preparation, treatment and losses, and for compensation as rent abatement and/or alternative temporary housing. In Ontario, Canada, these issues are often decided by adjudicators at the Landlord and Tenant Board hearing claims, counter-claims and defense by legal representation (lawyers and paralegals) as well as through mediation. Evidence in these hearings may include photographs, invoices for costs as well as testimony by tenants, landlords and "expert witnesses" who are most often pest control firms representing their landlord clients. A total of 44 Landlord and Tenant Board adjudicated cases available online were analyzed. The analysis included elements of the decisions such as adjudicator, claimant (landlord or tenant), basis of claim, review of evidence, amount of claim, amount awarded, and evaluation of the quality of the evidence. The results of the analysis of these findings are discussed. Recommendations for improvement of adjudicator decisions on the basis of knowledge of bed bug biology and Integrated Pest Management best practices are presented as well as the importance of education of tenants and landlords to a process of mutual trust, support and accountability.

  1. MULTI-YEAR BUDGETING–TOWARDS THE ENHANCEMENT OFFISCAL DISCIPLINE

    Directory of Open Access Journals (Sweden)

    Slawomir Franek

    2012-01-01

    Full Text Available The identification of the reasons for the existing fiscal imbalance shows that it isnecessary tointroducethe institutionalsolutionsof the budgetary process.Thispaper aimsto verify the hypothesis that the application of multi-year budgeting isa factor which increases fiscal discipline and promotes efficiency andtransparency of public finance.Theresearchpresents a comparative analysis ofthe quality of macroeconomic forecasts for EU countries including parameterssuch as the real GDP growth rate, general government sector deficit to GDP ratio,public debt to GDP ratio. Information contained in the EU Stability andConvergence Programmes and in the International Budget Practices andProcedures Database published by the OECD constituted the source of data for theresearch.

  2. Bioenergy Technologies Office Multi-Year Program Plan. March 2016

    Energy Technology Data Exchange (ETDEWEB)

    Schwab, Amy [Bioenergy Technologies Office, Washington, DC (United States)

    2016-03-01

    The Bioenergy Technologies Office is one of the 10 technology development offices within the Office of Energy Efficiency and Renewable Energy at the U.S. Department of Energy. This Multi-Year Program Plan (MYPP) sets forth the goals and structure of the Bioenergy Technologies Office (the Office). It identifies the research, development, and demonstration (RD&D), and market transformation and crosscutting activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation. This MYPP is intended for use as an operational guide to help the Office manage and coordinate its activities, as well as a resource to help communicate its mission and goals to stakeholders and the public.

  3. Tank waste remediation system multi-year work plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging open-quotes out sourcingclose quotes of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders

  4. Tank waste remediation system multi-year work plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

  5. A Multi-Year Plan for Research, Development, and Prototype Testing of Standard Modular Hydropower Technology

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Brennan T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Welch, Tim [U.S. Department of Energy (DOE), Washington, DC (United States).Office of Energy Efficiency and Renewable Energy (EERE); Witt, Adam M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Stewart, Kevin M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Lee, Kyutae [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); DeNeale, Scott T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bevelhimer, Mark S. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Burress, Timothy A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Pracheil, Brenda M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Pries, Jason L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); O' Connor, Patrick W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Curd, Shelaine L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Ekici, Kivanc [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Univ. of Tennessee, Knoxville, TN (United States); Papanicolaou, Thanos [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Univ. of Tennessee, Knoxville, TN (United States); Tsakiris, Achilleas [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Univ. of Tennessee, Knoxville, TN (United States); Kutz, Benjamin [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Univ. of Tennessee, Knoxville, TN (United States); Bishop, Norm [Knight Piesold, Denver, CO (United States); McKeown, Alisha [McKeown and Associates, Moberly, MO (United States); Rabon, Daniel [U.S. Department of Energy (DOE), Washington, DC (United States).Office of Energy Efficiency and Renewable Energy (EERE); Zimmerman, Gregory P. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Uria Martinez, Rocio [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); McManamay, Ryan A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-02-01

    The Multi-Year Plan for Research, Development, and Prototype Testing of Standard Modular Hydropower Technology (MYRP) presents a strategy for specifying, designing, testing, and demonstrating the efficacy of standard modular hydropower (SMH) as an environmentally compatible and cost-optimized renewable electricity generation technology. The MYRP provides the context, background, and vision for testing the SMH hypothesis: if standardization, modularity, and preservation of stream functionality become essential and fully realized features of hydropower technology, project design, and regulatory processes, they will enable previously unrealized levels of new project development with increased acceptance, reduced costs, increased predictability of outcomes, and increased value to stakeholders. To achieve success in this effort, the MYRP outlines a framework of stakeholder-validated criteria, models, design tools, testing facilities, and assessment protocols that will facilitate the development of next-generation hydropower technologies.

  6. Advanced reactors transition fiscal year 1995 multi-year program plan WBS 7.3

    International Nuclear Information System (INIS)

    Loika, E.F.

    1994-01-01

    This document describes in detail the work to be accomplished in FY-1995 and the out years for the Advanced Reactors Transition (WBS 7.3). This document describes specific milestones and funding profiles. Based upon the Fiscal Year 1995 Multi-Year Program Plan, DOE will provide authorization to perform the work outlined in the FY 1995 MYPP. Following direction given by the US Department of Energy (DOE) on December 15, 1993, Advanced Reactors Transition (ART), previously known as Advanced Reactors, will provide the planning and perform the necessary activities for placing the Fast Flux Test Facility (FFTF) in a radiologically and industrially safe shutdown condition. The DOE goal is to accomplish the shutdown in approximately five years. The Advanced Reactors Transition Multi-Year Program Plan, and the supporting documents; i.e., the FFTF Shutdown Program Plan and the FFTF Shutdown Project Resource Loaded Schedule (RLS), are defined for the life of the Program. During the transition period to achieve the Shutdown end-state, the facilities and systems will continue to be maintained in a safe and environmentally sound condition. Additionally, facilities that were associated with the Office of Nuclear Energy (NE) Programs, and are no longer required to support the Liquid Metal Reactor Program will be deactivated and transferred to an alternate sponsor or the Decontamination and Decommissioning (D and D) Program for final disposition, as appropriate

  7. Nudging – A Way to Encourage Public Tenants to More Sustainable Behaviour? : A study on how public landlords can make the sustainable choice easier

    OpenAIRE

    Haglund, Albin

    2017-01-01

    The public sector owns and manages approximately 90 million square meters of premises. One of the toughest challenges today is managing both climate-friendly and energy efficient buildings. For the landlords who facilitate these properties to reach national targets by 2020, they will need well thought out strategies. New technology and installations are not enough. Tenants also have to change their behaviour. A relatively new way to influence behaviour without changing values of people is nud...

  8. “Pets Negotiable”: How Do the Perspectives of Landlords and Property Managers Compare with Those of Younger Tenants with Dogs?

    Directory of Open Access Journals (Sweden)

    Taryn M. Graham

    2018-02-01

    Full Text Available Previous research has shown that housing insecurity contributes to animal relinquishment and that tenants with dogs face disadvantages in the rental market. Still, little is known about how dog owners navigate rental markets, nor how landlords and property managers perceive dogs and other pets. This case study reports on in-depth interviews with younger tenants with dogs and on open-ended survey responses from landlords and property managers. In their housing searches, tenants with dogs reported feeling powerless in negotiations and feeling discriminated against. They described settling for substandard properties, often located in less desirable neighborhoods. Also, some said they felt obliged to stay put in these rentals, given how difficult it had been to find a place that would accommodate their dogs. Meanwhile, landlords and property managers indicated that listings advertised as “pet-friendly” tend to receive more applicants than listings in which pets are prohibited. Suggestions for improvement included meeting pets prior to signing the lease; getting everything in writing; steering clear from furnished units; charging utilities to tenants; and speeding up the pet approval process when dealing with condominium boards. These suggestions offer implications for future research, partnerships, and policy options to improve the prospects of pets and their people in rental housing.

  9. “Pets Negotiable”: How Do the Perspectives of Landlords and Property Managers Compare with Those of Younger Tenants with Dogs?

    Science.gov (United States)

    Graham, Taryn M.; Milaney, Katrina J.; Adams, Cindy L.

    2018-01-01

    Simple Summary In rental housing policy, pets are rarely considered as valued household members. Instead, landlords and property managers are often permitted to ban pets outright, or to advertise them as merely negotiable in their listings for rental housing. In fact, previous research has shown that moving and renting are key reasons for animal relinquishment. To reduce the number of animals that are given up each year due to housing issues, we surveyed landlords and property managers about their perspectives towards pets. Also, because younger adults are disproportionately tenants and because dogs are often banned from rental housing, we interviewed younger tenants with dogs about their recent experiences in the rental market. Our results confirm that dog owners face difficulties in finding rental housing. To keep their pets, tenants made compromises on where and how they lived, which held consequences for their health and that of their pets. Suggestions for improvement are provided, as are implications for research, policy, and practice. Abstract Previous research has shown that housing insecurity contributes to animal relinquishment and that tenants with dogs face disadvantages in the rental market. Still, little is known about how dog owners navigate rental markets, nor how landlords and property managers perceive dogs and other pets. This case study reports on in-depth interviews with younger tenants with dogs and on open-ended survey responses from landlords and property managers. In their housing searches, tenants with dogs reported feeling powerless in negotiations and feeling discriminated against. They described settling for substandard properties, often located in less desirable neighborhoods. Also, some said they felt obliged to stay put in these rentals, given how difficult it had been to find a place that would accommodate their dogs. Meanwhile, landlords and property managers indicated that listings advertised as “pet-friendly” tend to receive

  10. Multi-year predictability in a coupled general circulation model

    Energy Technology Data Exchange (ETDEWEB)

    Power, Scott; Colman, Rob [Bureau of Meteorology Research Centre, Melbourne, VIC (Australia)

    2006-02-01

    Multi-year to decadal variability in a 100-year integration of a BMRC coupled atmosphere-ocean general circulation model (CGCM) is examined. The fractional contribution made by the decadal component generally increases with depth and latitude away from surface waters in the equatorial Indo-Pacific Ocean. The relative importance of decadal variability is enhanced in off-equatorial ''wings'' in the subtropical eastern Pacific. The model and observations exhibit ''ENSO-like'' decadal patterns. Analytic results are derived, which show that the patterns can, in theory, occur in the absence of any predictability beyond ENSO time-scales. In practice, however, modification to this stochastic view is needed to account for robust differences between ENSO-like decadal patterns and their interannual counterparts. An analysis of variability in the CGCM, a wind-forced shallow water model, and a simple mixed layer model together with existing and new theoretical results are used to improve upon this stochastic paradigm and to provide a new theory for the origin of decadal ENSO-like patterns like the Interdecadal Pacific Oscillation and Pacific Decadal Oscillation. In this theory, ENSO-driven wind-stress variability forces internal equatorially-trapped Kelvin waves that propagate towards the eastern boundary. Kelvin waves can excite reflected internal westward propagating equatorially-trapped Rossby waves (RWs) and coastally-trapped waves (CTWs). CTWs have no impact on the off-equatorial sub-surface ocean outside the coastal wave guide, whereas the RWs do. If the frequency of the incident wave is too high, then only CTWs are excited. At lower frequencies, both CTWs and RWs can be excited. The lower the frequency, the greater the fraction of energy transmitted to RWs. This lowers the characteristic frequency of variability off the equator relative to its equatorial counterpart. Both the eastern boundary interactions and the accumulation of

  11. Estimating Global Cropland Extent with Multi-year MODIS Data

    Directory of Open Access Journals (Sweden)

    Christopher O. Justice

    2010-07-01

    Full Text Available This study examines the suitability of 250 m MODIS (MODerate Resolution Imaging Spectroradiometer data for mapping global cropland extent. A set of 39 multi-year MODIS metrics incorporating four MODIS land bands, NDVI (Normalized Difference Vegetation Index and thermal data was employed to depict cropland phenology over the study period. Sub-pixel training datasets were used to generate a set of global classification tree models using a bagging methodology, resulting in a global per-pixel cropland probability layer. This product was subsequently thresholded to create a discrete cropland/non-cropland indicator map using data from the USDA-FAS (Foreign Agricultural Service Production, Supply and Distribution (PSD database describing per-country acreage of production field crops. Five global land cover products, four of which attempted to map croplands in the context of multiclass land cover classifications, were subsequently used to perform regional evaluations of the global MODIS cropland extent map. The global probability layer was further examined with reference to four principle global food crops: corn, soybeans, wheat and rice. Overall results indicate that the MODIS layer best depicts regions of intensive broadleaf crop production (corn and soybean, both in correspondence with existing maps and in associated high probability matching thresholds. Probability thresholds for wheat-growing regions were lower, while areas of rice production had the lowest associated confidence. Regions absent of agricultural intensification, such as Africa, are poorly characterized regardless of crop type. The results reflect the value of MODIS as a generic global cropland indicator for intensive agriculture production regions, but with little sensitivity in areas of low agricultural intensification. Variability in mapping accuracies between areas dominated by different crop types also points to the desirability of a crop-specific approach rather than attempting

  12. Building Technologies Program Multi-Year Program Plan Research and Development 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for research and development, including residential and commercial integration, lighting, HVAC and water heating, envelope, windows, and analysis tools.

  13. Plutonium stabilization and disposition focus area, FY 1999 and FY 2000 multi-year program plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Consistent with the Environmental Management`s (EM`s) plan titled, ``Accelerating Cleanup: Paths to Closure``, and ongoing efforts within the Executive Branch and Congress, this Multi-Year Program Plan (MYPP) for the Plutonium Focus Area was written to ensure that technical gap projects are effectively managed and measured. The Plutonium Focus Area (PFA) defines and manages technology development programs that contribute to the effective stabilization of nuclear materials and their subsequent safe storage and final disposition. The scope of PFA activities includes the complete spectrum of plutonium materials, special isotopes, and other fissile materials. The PFA enables solutions to site-specific and complex-wide technology issues associated with plutonium remediation, stabilization, and preparation for disposition. The report describes the current technical activities, namely: Plutonium stabilization (9 studies); Highly enriched uranium stabilization (2 studies); Russian collaboration program (2 studies); Packaging and storage technologies (6 studies); and PFA management work package/product line (3 studies). Budget information for FY 1999 and FY 2000 is provided.

  14. Plutonium stabilization and disposition focus area, FY 1999 and FY 2000 multi-year program plan

    International Nuclear Information System (INIS)

    1998-03-01

    Consistent with the Environmental Management's (EM's) plan titled, ''Accelerating Cleanup: Paths to Closure'', and ongoing efforts within the Executive Branch and Congress, this Multi-Year Program Plan (MYPP) for the Plutonium Focus Area was written to ensure that technical gap projects are effectively managed and measured. The Plutonium Focus Area (PFA) defines and manages technology development programs that contribute to the effective stabilization of nuclear materials and their subsequent safe storage and final disposition. The scope of PFA activities includes the complete spectrum of plutonium materials, special isotopes, and other fissile materials. The PFA enables solutions to site-specific and complex-wide technology issues associated with plutonium remediation, stabilization, and preparation for disposition. The report describes the current technical activities, namely: Plutonium stabilization (9 studies); Highly enriched uranium stabilization (2 studies); Russian collaboration program (2 studies); Packaging and storage technologies (6 studies); and PFA management work package/product line (3 studies). Budget information for FY 1999 and FY 2000 is provided

  15. Multi-year prediction of estrogenicity in municipal wastewater effluents.

    Science.gov (United States)

    Arlos, Maricor J; Parker, Wayne J; Bicudo, José R; Law, Pam; Marjan, Patricija; Andrews, Susan A; Servos, Mark R

    2018-01-01

    In this study, the estrogenicity of two major wastewater treatment plant (WWTP) effluents located in the central reaches of the Grand River watershed in southern Ontario was estimated using population demographics, excretion rates, and treatment plant-specific removals. Due to the lack of data on estrogen concentrations from direct measurements at WWTPs, the treatment efficiencies through the plants were estimated using the information obtained from an effects-directed analysis. The results show that this approach could effectively estimate the estrogenicity of WWTP effluents, both before and after major infrastructure upgrades were made at the Kitchener WWTP. The model was then applied to several possible future scenarios including population growth and river low flow conditions. The scenario analyses showed that post-upgrade operation of the Kitchener WWTP will not release highly estrogenic effluent under the 2041 projected population increase (36%) or summer low flows. Similarly, the Waterloo WWTP treatment operation is also expected to improve once the upgrades have been fully implemented and is expected to effectively treat estrogens even under extreme scenarios of population growth and river flows. The developed model may be employed to support decision making on wastewater management strategies designed for environmental protection, especially on reducing the endocrine effects in fish exposed to WWTP effluents. Copyright © 2017 Elsevier B.V. All rights reserved.

  16. FTA multi-year research program plan (FY 2009 - FY 2013).

    Science.gov (United States)

    2008-09-01

    The Multi-Year Research Program Plan (Program Plan), prepared by the Federal Transit Administrations (FTA) Office of : Research, Demonstration, and Innovation (TRI), is part of FTAs strategic planning process. It provides descriptive : summarie...

  17. Building Technologies Program Multi-Year Program Plan Technology Validation and Market Introduction 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for technology validation and market introduction, including ENERGY STAR, building energy codes, technology transfer application centers, commercial lighting initiative, EnergySmart Schools, EnergySmar

  18. Multi-year simulations of air pollution in two cities

    Science.gov (United States)

    Zink, Katrin; Berchet, Antoine; Emmenegger, Lukas; Brunner, Dominik

    2016-04-01

    As more and more people are living in urban areas world wide, air quality monitoring and forecasting at the city scale becomes increasingly critical. Due to the proximity to sources and the complex, fine-scale structure of the flow and turbulence in the built environment, air pollutant concentrations vary strongly in cities both spatially and temporally. Studies assessing the effect of air pollution on human health would greatly benefit from accurate knowledge of individual exposure, but given the high variability of concentrations and the mobility of the population, this is a marvellous task requiring highly-resolved, city-wide information on air pollutant concentrations. The Swiss Nano-Tera project OpenSense II addresses these issues using statistical and physical modeling of air pollution at very high resolution combined with long-term air pollution measurements and mobile networks of low-cost sensors. In the framework of this project, we have set up the nested meteorology and dispersion model system GRAMM/GRAL the cities of Lausanne and Zurich and improved several computational aspects of the system. Using the mesoscale model GRAMM, we simulate the flow in a larger domain around the two cities at 100 m resolution taking the complex topography and influences of different land cover on surface-atmosphere exchange of heat and momentum into account. These flow fields serve as initial and boundary conditions for the nested model GRAL, which simulates the flow inside the city at building-resolving scale (5 m resolution) based on the Reynolds-Averaged-Navier-Stokes equations, and computes the transport and dispersion of air pollutants in a Lagrangian framework. For computational efficiency, both GRAMM and GRAL simulations are run for a fixed catalog of 1008 weather situations varying in terms of background wind speed, direction and stability. Hourly time-series of meteorology and air pollutants are constructed from these steady-state solutions by selecting, for each

  19. Controls on Arctic sea ice from first-year and multi-year survival rates

    Energy Technology Data Exchange (ETDEWEB)

    Hunke, Jes [Los Alamos National Laboratory

    2009-01-01

    The recent decrease in Arctic sea ice cover has transpired with a significant loss of multi year ice. The transition to an Arctic that is populated by thinner first year sea ice has important implications for future trends in area and volume. Here we develop a reduced model for Arctic sea ice with which we investigate how the survivability of first year and multi year ice control the mean state, variability, and trends in ice area and volume.

  20. Hanford environmental management program multi-year work plan FY1998

    International Nuclear Information System (INIS)

    Giese, K.A.

    1997-01-01

    The Environmental Support FY 1998 Multi-Year Work Plan (MYWP), consisting of the Hanford Environmental Management Program (HEMP) and the Effluent and Environmental Monitoring (EEM) Program MYWP is prepared to specifically establish the execution year's work scope, budget targets, and schedule baselines. The work plan contains the work breakdown structure (WBS) and the WBS dictionary, milestone listings and milestone description sheets, and cost targets that the program manager will use to manage program work for the fiscal year. Where activities required to maintain or attain compliance with environmental requirements and agreements are impacted as a result of a reduction of the authorized funds, the ''Work Authorization'' identifies the impacted scope and requires the Contracting Officer's or Assistant Manager-Contracting Officer's Representative signature. Change requests will be submitted to RL by the contractor for approval, further documenting the impacts of any environmental and agreement noncompliances as a result of funding limitations. This is the first year that the MYWPs are submitted under the new Project Hanford Management Contractor (PHMC). The MYWPs are structured differently than in prior years. The MYWP is divided into two main sections. Section One is titled the ''Project Summary Section'' and Section Two is titled the ''Additional Sections at the Project Baseline Summaries Level''. Section One is where the major project summary-level information is provided. Section Two is designed to detail the information for each Project Baseline Summary (PBS) that falls under the purview of the major project listed in Section One. Considering all of the PHMC MYWPs, the HEMP and EEM programs are the one exception to the above description. HEMP and EEM are two of five separate programs that are organized under one common PBS that is titled Mission Support (PBS number-sign RL-OT01). RL has given guidance that HEMP and EEM will be submitted as one common MYWP

  1. Facility stabilization project, fiscal year 1998 Multi-Year Workplan (MYWP) for WBS 1.4

    International Nuclear Information System (INIS)

    Floberg, W.C.

    1997-01-01

    The primary Facility Stabilization mission is to provide minimum safe surveillance and maintenance of facilities and deactivate facilities on the Hanford Site, to reduce risks to workers, the public and environment, transition the facilities to a low cost, long term surveillance and maintenance state, and to provide safe and secure storage of special nuclear materials, nuclear materials, and nuclear fuel. Facility Stabilization will protect the health and safety of the public and workers, protect the environment and provide beneficial use of the facilities and other resources. Work will be in accordance with the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), local, national, international and other agreements, and in compliance with all applicable Federal, state, and local laws. The stakeholders will be active participants in the decision processes including establishing priorities, and in developing a consistent set of rules, regulations, and laws. The work will be leveraged with a view of providing positive, lasting economic impact in the region. Effectiveness, efficiency, and discipline in all mission activities will enable Hanford Site to achieve its mission in a continuous and substantive manner. As the mission for Facility Stabilization has shifted from production to support of environmental restoration, each facility is making a transition to support the Site mission. The mission goals include the following: (1) Achieve deactivation of facilities for transfer to EM-40, using Plutonium Uranium Extraction (PUREX) plant deactivation as a model for future facility deactivation; (2) Manage nuclear materials in a safe and secure condition and where appropriate, in accordance with International Atomic Energy Agency (IAEA) safeguards rules; (3) Treat nuclear materials as necessary, and store onsite in long-term interim safe storage awaiting a final disposition decision by US Department of Energy; (4) Implement nuclear materials disposition directives. In the near term these are anticipated to mostly involve transferring uranium to other locations for beneficial use. Work will be in accordance with the Tri-Party Agreement, and other agreements and in compliance with all applicable Federal, state and local laws. The transition to deactivation will be accomplished through a phased approach, while maintaining the facilities in a safe and compliant configuration. In addition, Facility Stabilization will continue to maintain safe long-term storage facilities for Special Nuclear Material (SNM), Nuclear Material (NM), and Nuclear Fuel (NF). The FSP deactivation strategy aligns with the deactivate facilities mission outlined in Hanford Site SE documentation. Inherent to the FSP strategies are specific Hanford Strategic Plan success indicators such as: reduction of risks to workers, the public and environment; increasing the amount of resources recovered for other uses; reduction/elimination of inventory and materials; and reduction/elimination of costly mortgages

  2. Bioenergy Technologies Office Multi-Year Program Plan: November 2014 Update

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-11-01

    This is the November 2014 Update to the Multi-Year Program Plan, which sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the RDD&D activities the Office will focus on over the next four years.

  3. Bioenergy Technologies Office Multi-Year Program Plan: March 2015 Update

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2015-03-01

    This is the March 2015 Update to the Multi-Year Program Plan, which sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the RDD&D activities the Office will focus on over the next four years.

  4. Multi-year and reference year weather data for building energy labelling in north Italy climates

    NARCIS (Netherlands)

    Pernigotto, G.; Prada, A.; Costola, D.; Gasparella, A.; Hensen, J.L.M.

    2014-01-01

    Representative weather information is essential for a reliable building energy performance evaluation. Even if detailed energy analyses can be carried out considering the multi-year weather data, generally a single reference year is adopted. Thus, this artificial year has to correctly approximate

  5. Policy Design of Multi-Year Crop Insurance Contracts with Partial Payments.

    Directory of Open Access Journals (Sweden)

    Ying-Erh Chen

    Full Text Available Current crop insurance is designed to mitigate monetary fluctuations resulting from yield losses for a specific year. However, yield realization tendency can vary from year to year and may depend on the correlation of yield realizations across years. When the current single-year Yield Protection (YP and Area Risk Protection Insurance (ARPI contracts are extended to multiple periods, actuarially fair premium rate is expected to decrease as poor yield realizations in a year can be offset by another year's better yield realizations. In this study, we first use simulations to demonstrate how significant premium savings are possible when coverage is based on the sum of yields across years rather than on a year-by-year basis. We then describe the design of a multi-year framework of crop insurance and model the insurance using a copula approach. Insurance terms are extended to more than a year and the premium, liability, and indemnity are determined by a multi-year term. Moreover, partial payment is provided at the end of each term to offset the possibility of significant loss in a single term. County-level data obtained from the U.S. Department of Agriculture are used to demonstrate the implementations of the proposed multi-year crop insurance. The proposed multi-year plan would benefit farmers by offering insurance guarantees across years for significantly lower costs.

  6. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  7. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    The RCRA ampersand Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects ampersand Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC's scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule

  8. Controls on Arctic sea ice from first-year and multi-year ice survival rates

    Science.gov (United States)

    Armour, K.; Bitz, C. M.; Hunke, E. C.; Thompson, L.

    2009-12-01

    The recent decrease in Arctic sea ice cover has transpired with a significant loss of multi-year (MY) ice. The transition to an Arctic that is populated by thinner first-year (FY) sea ice has important implications for future trends in area and volume. We develop a reduced model for Arctic sea ice with which we investigate how the survivability of FY and MY ice control various aspects of the sea-ice system. We demonstrate that Arctic sea-ice area and volume behave approximately as first-order autoregressive processes, which allows for a simple interpretation of September sea-ice in which its mean state, variability, and sensitivity to climate forcing can be described naturally in terms of the average survival rates of FY and MY ice. This model, used in concert with a sea-ice simulation that traces FY and MY ice areas to estimate the survival rates, reveals that small trends in the ice survival rates explain the decline in total Arctic ice area, and the relatively larger loss of MY ice area, over the period 1979-2006. Additionally, our model allows for a calculation of the persistence time scales of September area and volume anomalies. A relatively short memory time scale for ice area (~ 1 year) implies that Arctic ice area is nearly in equilibrium with long-term climate forcing at all times, and therefore observed trends in area are a clear indication of a changing climate. A longer memory time scale for ice volume (~ 5 years) suggests that volume can be out of equilibrium with climate forcing for long periods of time, and therefore trends in ice volume are difficult to distinguish from its natural variability. With our reduced model, we demonstrate the connection between memory time scale and sensitivity to climate forcing, and discuss the implications that a changing memory time scale has on the trajectory of ice area and volume in a warming climate. Our findings indicate that it is unlikely that a “tipping point” in September ice area and volume will be

  9. Experience with the Multi-Year Implementation of an Industrial Control System

    CERN Document Server

    Kuhn, H K; Juillerat, A C; Rabany, Michel; Wollès, J C

    2000-01-01

    In 1990, CERN passed a multi-year purchasing and installation contract for the LEP 200 Cryogenics control system with ABB, one of the world's leading suppliers of integrated Distributed Control Systems (DCS). A financial framework provided over a period of eight years the required supplies. These were called up with so called "Release Orders", taking into account the latest technical developments. The issues and experiences with such a new approach and the resulting control system are described.

  10. Multi-year consumption analysis and innovative energy perspectives: The case study of Leonardo da Vinci International Airport of Rome

    International Nuclear Information System (INIS)

    Rubeis, Tullio de; Nardi, Iole; Paoletti, Domenica; Di Leonardo, Antonella; Ambrosini, Dario; Poli, Ruggero; Sfarra, Stefano

    2016-01-01

    Highlights: • A systematic approach for energy management of complex structures is proposed. • Technological systems of Leonardo da Vinci Airport of Rome are described. • A multi-year consumption analysis highlights the most energy-consuming sectors. • The “Smart Grid” prototype project inherent to T1 Terminal is presented. • Wind and photovoltaic plants are designed and discussed to test the smart storage. - Abstract: Because of the growing need for efficient energy production systems, energy policies promoted in recent years have also involved complex structures, like airports. This paper proposes the implementation of an energy management system for a very energy-consuming structure, composed of different power plants and many energy consumers: the Leonardo da Vinci International Airport of Rome. In this study, the examination of historical data related to airport electric power, thermal energy and fuel consumption is discussed, starting with the analysis of the production energy plants, mainly based on a combined heat and power system. Furthermore, pioneering solutions are proposed, not only to cover airport energy requirements, but also to test the safety and reliability of innovative load management systems. For this reason, the choice of the Leonardo da Vinci management company, oriented to install a smart storage in order to manage the bidirectional energy flows by consumers and producers, is justified. Such innovative energy procurement systems are examined, with the goal of achieving greater penetration of renewable sources: mini and micro wind power plants and high concentrator photovoltaic plants.

  11. Opinion of the committee of experts for energy transition on the energy multi-year programming (PPE). Opinion of the committee of experts for energy transition for energy multi-year programming for Corsica

    International Nuclear Information System (INIS)

    2015-01-01

    After a discussion on the whole project of energy multi-year programming (PPE), a first document more particularly discusses issues related to the management of energy demand, to the security of supply (for the electric power sector, the gas sector, the gas/power sector), and to the development of infrastructures and flexibility for the power system. The issue of energy supply is then addressed. Then, the authors discuss some statements present in various appendices to the PPE: its legal framework with its articulation to other planning documents, its energy hypotheses (for buildings), its measures related to the preservation of consumer purchasing power and to that of company competitiveness, its definition of a maximum envelope of public funds dedicated to the achievement of PPE quantitative objectives, its assessment of needs of professional abilities in the field of energy and the adaptation of education and training to these needs, its strategic environmental assessment. Then, the committee discusses the content of the strategy of development of a clean mobility which has been elaborated as foreseen by the law on energy transition, and has been attached to the PPE project. A second document addresses some of these issues in the specific case of Corsica. It more particularly states recommendations on the PPE general framework, on objectives related to energy demand, on objectives related to security of supply, on energy supply, on energy infrastructures, on the elaboration and consultation process, on economic assessment, on social assessment, on environmental assessment, and on the follow-up of the Corsica PPE. Some propositions are finally made by the committee at the attention of writers of the Corsica PPE

  12. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    International Nuclear Information System (INIS)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides 'execution year' work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets

  13. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  14. Multi-year programming of energy - The energy transition for a green growth

    International Nuclear Information System (INIS)

    2016-01-01

    This document gathers several documents. It contains the decree related to the definition of the multi-year programming of energy (in France), and then a synthesis of this policy which addresses its main objectives: to define a coherent framework for action for energy transition, to improve energy efficiency and reduce the consumption of fossil energies, to accelerate the development of renewable energies, to maintain a high level of security of supply while complying with environmental requirements, to prepare tomorrow's energy system, to develop a clean mobility, and to take economic and social of energy transition into account and to act with territories. The next documents address the implementation framework of the multi-year programming of energy, aspects related to energy demand management, aspects related to energy supply, aspects related to security of supply, to the development of infrastructures and to the flexibility of the electricity system, the strategy for the development of a clean mobility, aspects related to social and economic impacts, aspects related to the French western isles. A report is also proposed as an environmental strategic assessment of this programming and of its part related to the strategy for the development of a clean mobility. The opinion of Environmental Authority on this programming is also provided, as well as an information note published as an answer to this opinion. A debate of the national council for energy transition is included, as well as the opinion of the High Council for Energy, the texts of several amendments notably proposed by EDF, and the opinion of the expert committee for energy transition

  15. Multi-year Droughts in California in the Last Two Decades

    Science.gov (United States)

    Myoung, B.; Kafatos, M.

    2016-12-01

    Multi-year droughts in California including the notorious 2013-2014 drought became serious problems recently, causing significant socio-economic damages. In the present study, focusing on the three multi-year droughts in California, i.e., 1999-2002, 2007-2009, and 2012-2014, during the recent two decades (1995-2014), we compared and investigated their characteristics of the atmosphere and the oceans. By positioning abnormally strong anticyclonic circulations at 500 hPa over the North Pacific, the droughts seem to start around strong La Niña years and continued or intensified until the year prior to an El Niño. While precipitation decreases in La Niña years have been well documented previously, the intensification of droughts in the later period has not. The Empirical Orthogonal Function (EOF) and correlation analyses suggest that, around strong La Niña years, the first EOF mode (EOF1) of the 500 hPa height is active, while the second EOF mode (EOF2) becomes active in moderate/weak La Nina years. It is also found that while EOF1 is sensitive to SST variability in the central Pacific which is associated with the major ENSO events, EOF2 is sensitive to that in the western/South Pacific. Relations to various climate variability other than ENSO, e.g., Pacific Decadal Oscillation (PDO), Tropical/Northern Hemisphere (TNH), Pacific/North American (PNA), and North Atlantic Oscillation (NAO), are also examined.

  16. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2; TOPICAL

    International Nuclear Information System (INIS)

    GRYGIEL, M.L.

    1998-01-01

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baseline and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system

  17. Building energy simulation using multi-years and typical meteorological years in different climates

    International Nuclear Information System (INIS)

    Yang Liu; Lam, Joseph C.; Liu Jiaping; Tsang, C.L.

    2008-01-01

    Detailed hourly energy simulation was conducted for office buildings in the five major climate zones - severe cold, cold, hot summer and cold winter, mild and hot summer and warm winter - in China using multi-year (1971-2000) weather databases as well as typical meteorological years (TMY). The primary aim was to compare the energy simulation results from the TMY with those from individual years and their long term means. A total of 154 simulation runs were performed. Building heating and cooling loads, their components and energy use for heating, ventilation and air-conditioning were analysed. Predicted monthly load and energy consumption profiles from the TMY tended to follow the long term mean quite closely. Mean bias errors ranged from -4.3% in Guangzhou to 0% in Beijing and root-mean-square errors from 3% in Harbin to 5.4% in Guangzhou. These percentages were not always the smallest compared with the 30 individual years, however, they are at the lower end of the percentage error ranges. This paper presents the work and its findings

  18. Multi-year Estimates of Methane Fluxes in Alaska from an Atmospheric Inverse Model

    Science.gov (United States)

    Miller, S. M.; Commane, R.; Chang, R. Y. W.; Miller, C. E.; Michalak, A. M.; Dinardo, S. J.; Dlugokencky, E. J.; Hartery, S.; Karion, A.; Lindaas, J.; Sweeney, C.; Wofsy, S. C.

    2015-12-01

    We estimate methane fluxes across Alaska over a multi-year period using observations from a three-year aircraft campaign, the Carbon Arctic Reservoirs Vulnerability Experiment (CARVE). Existing estimates of methane from Alaska and other Arctic regions disagree in both magnitude and distribution, and before the CARVE campaign, atmospheric observations in the region were sparse. We combine these observations with an atmospheric particle trajectory model and a geostatistical inversion to estimate surface fluxes at the model grid scale. We first use this framework to estimate the spatial distribution of methane fluxes across the state. We find the largest fluxes in the south-east and North Slope regions of Alaska. This distribution is consistent with several estimates of wetland extent but contrasts with the distribution in most existing flux models. These flux models concentrate methane in warmer or more southerly regions of Alaska compared to the estimate presented here. This result suggests a discrepancy in how existing bottom-up models translate wetland area into methane fluxes across the state. We next use the inversion framework to explore inter-annual variability in regional-scale methane fluxes for 2012-2014. We examine the extent to which this variability correlates with weather or other environmental conditions. These results indicate the possible sensitivity of wetland fluxes to near-term variability in climate.

  19. Dynamical Downscaling of NASA/GISS ModelE: Continuous, Multi-Year WRF Simulations

    Science.gov (United States)

    Otte, T.; Bowden, J. H.; Nolte, C. G.; Otte, M. J.; Herwehe, J. A.; Faluvegi, G.; Shindell, D. T.

    2010-12-01

    The WRF Model is being used at the U.S. EPA for dynamical downscaling of the NASA/GISS ModelE fields to assess regional impacts of climate change in the United States. The WRF model has been successfully linked to the ModelE fields in their raw hybrid vertical coordinate, and continuous, multi-year WRF downscaling simulations have been performed. WRF will be used to downscale decadal time slices of ModelE for recent past, current, and future climate as the simulations being conducted for the IPCC Fifth Assessment Report become available. This presentation will focus on the sensitivity to interior nudging within the RCM. The use of interior nudging for downscaled regional climate simulations has been somewhat controversial over the past several years but has been recently attracting attention. Several recent studies that have used reanalysis (i.e., verifiable) fields as a proxy for GCM input have shown that interior nudging can be beneficial toward achieving the desired downscaled fields. In this study, the value of nudging will be shown using fields from ModelE that are downscaled using WRF. Several different methods of nudging are explored, and it will be shown that the method of nudging and the choices made with respect to how nudging is used in WRF are critical to balance the constraint of ModelE against the freedom of WRF to develop its own fields.

  20. Superior sensory, motor, and cognitive performance in elderly individuals with multi-year dancing activities

    Directory of Open Access Journals (Sweden)

    Jan-Christoph Kattenstroth

    2010-07-01

    Full Text Available Aging is associated with a progressive decline of mental and physical abilities. Considering the current demographic changes in many civilizations there is an urgent need for measures permitting an independent lifestyle into old age. The critical role of physical exercise in mediating and maintaining physical and mental fitness is well-acknowledged. Dance, in addition to physical activity, combines emotions, social interaction, sensory stimulation, motor coordination and music, thereby creating enriched environmental conditions for human individuals. Here we demonstrate the impact of multi-year (average 16.5 years amateur dancing (AD in a group of elderly subjects (aged 65 to 84 years as compared to education-, gender- and aged-matched controls (CG having no record of dancing or sporting activities. Besides posture and balance parameters, we tested reaction times, motor behavior, tactile and cognitive performance. In each of the different domains investigated, the AD group had a superior performance as compared to the non-dancer CG group. Analysis of individual performance revealed that the best participants of the AD group were not better than individuals of the CG group. Instead, the AD group lacked individuals showing poor performance, which was frequently observed for the CG group. This observation implies that maintaining a regular schedule of dancing into old age can preserve cognitive, motor and perceptual abilities and prevent them from degradation. We conclude that the far-reaching beneficial effects found in the AD group make dance, beyond its ability to facilitate balance and posture, a prime candidate for the preservation of everyday life competence of elderly individuals.

  1. Multi-year GNSS monitoring of atmospheric IWV over Central and South America for climate studies

    Science.gov (United States)

    Mendoza, Luciano; Bianchi, Clara; Fernández, Laura; Natali, María Paula; Meza, Amalia; Moirano, Juan

    2017-04-01

    Atmospheric water vapour has been acknowledged as an essential climate variable. Weather prediction and hazard assessment systems benefit from real-time observations, whereas long-term records contribute to climate studies. Nowadays, ground-based GNSS products have become widely employed, complementing satellite observations over the oceans. Although the past decade has seen a significant development of the GNSS infrastructure in Central and South America, its potential for atmospheric water vapour monitoring has not been fully exploited. With this in mind, we have performed a regional, seven-year long and homogeneous analysis, comprising 136 GNSS tracking stations, obtaining high-rate and continuous observations of column integrated water vapour and troposphere zenith total delay (Bianchi et al. 2016). As preliminary application for this data set, we have estimated local water vapour trends, their significance, and their relation with specific climate regimes. We have found evidence of drying at temperate regions in South America, at a rate of about 2% per decade, while a slow moistening of the troposphere over tropical regions is also weakly suggested by our results. Furthermore, we have assessed the regional performance of the empirical model GPT2w to blindly estimate troposphere delays. The model fairly reproduces the observed mean delays, including their annual and semi-annual variations. Nevertheless, a long-term evaluation has shown systematical biases, up to 20 mm, probably inherited form the underling atmospheric reanalysis. Additionally, the complete data set has been made openly available at a scientific repository (doi:10.1594/PANGAEA.858234). References: C. Bianchi, L. Mendoza, L. Fernandez, M. P. Natali, A. Meza, J. F. Moirano, Multi-year GNSS monitoring of atmospheric IWV over Central and South America for climate studies, Ann. Geophys., ISSN 0992-7689, eISSN 1432-0576, 34 (7), 623-639 (doi:10.5194/angeo-34-623-2016).

  2. Natural Gas Strategic Plan and Multi-Year Program Crosscut Plan, FY 1994--1999

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    DOE has established a Natural Gas Coordinating Committee to ensure that all natural gas programs are conducted with a single strategic focus and without unnecessary duplication. This group prepared the FY 1993 update of the DOE Natural Gas Strategic Plan and Multi-Year Crosscut Program Plan (FY 1993-1998), which was first produced a year ago as a ``working draft`` for industry comment. This revised version incorporates these external comments and the results and recommendations of such developments as Order No. 636 of the Federal Energy Regulatory Commission (FERC), the FERC/DOE Natural Gas Deliverability Task Force Report; the National Petroleum Council`s 1992 natural gas study, The Potential for Natural Gas in the United States; relevant provisions of the EPACT, and new policy guidance from the Clinton Administration. The overall goal of the Natural Gas RD&D Program is to improve the Nation`s ability to supply, store, transport, distribute, and utilize gas in an economically efficient and environmentally beneficial manner. In support of DOE`s missions are programs that will: improve the confidence in the continued availability of a long-term gas supply (Resource and Extraction Area); provide more cost-effective and competitive means to use natural gas in both new and existing markets (Utilization Area); develop improved and less costly means of delivering and storing gas (Delivery and Storage Area); and develop and ensure availability of low cost environmental compliance technology, and reduce regulatory barriers to efficient market operations by promoting coordinated, efficient, and innovative Federal and State regulations (Environmental/Regulatory Impact Area). Each program area has its own unique mission that contributes to the goals and mission of the overall Natural Gas Program.

  3. Multi-year lags between forest browning and soil respiration at high northern latitudes.

    Directory of Open Access Journals (Sweden)

    Ben Bond-Lamberty

    Full Text Available High-latitude northern ecosystems are experiencing rapid climate changes, and represent a large potential climate feedback because of their high soil carbon densities and shifting disturbance regimes. A significant carbon flow from these ecosystems is soil respiration (R(S, the flow of carbon dioxide, generated by plant roots and soil fauna, from the soil surface to atmosphere, and any change in the high-latitude carbon cycle might thus be reflected in R(S observed in the field. This study used two variants of a machine-learning algorithm and least squares regression to examine how remotely-sensed canopy greenness (NDVI, climate, and other variables are coupled to annual R(S based on 105 observations from 64 circumpolar sites in a global database. The addition of NDVI roughly doubled model performance, with the best-performing models explaining ∼62% of observed R(S variability. We show that early-summer NDVI from previous years is generally the best single predictor of R(S, and is better than current-year temperature or moisture. This implies significant temporal lags between these variables, with multi-year carbon pools exerting large-scale effects. Areas of decreasing R(S are spatially correlated with browning boreal forests and warmer temperatures, particularly in western North America. We suggest that total circumpolar R(S may have slowed by ∼5% over the last decade, depressed by forest stress and mortality, which in turn decrease R(S. Arctic tundra may exhibit a significantly different response, but few data are available with which to test this. Combining large-scale remote observations and small-scale field measurements, as done here, has the potential to allow inferences about the temporal and spatial complexity of the large-scale response of northern ecosystems to changing climate.

  4. 34 CFR 75.253 - Continuation of a multi-year project after the first budget period.

    Science.gov (United States)

    2010-07-01

    ... sufficient funds under the program; (2) The recipient has either— (i) Made substantial progress toward meeting the objectives in its approved application; or (ii) Obtained the Secretary's approval of changes... those objectives in succeeding budget periods; (3) The recipient has submitted all reports as required...

  5. Multi-year ozone concentration and its spectra in Shanghai, China

    Energy Technology Data Exchange (ETDEWEB)

    Geng, Fuhai; Mao, Xiaoqin [Shanghai Meteorological Bureau, Shanghai (China); Shanghai Key Laboratory of Meteorology and Health, Shanghai (China); Zhou, Mingyu, E-mail: mingyuzhou34@163.com [National Marine Environmental Forecasts Center, State Oceanic Administration, Beijing (China); Zhong, Shiyuan [Department of Geography, Michigan State University, East Lansing, MI (United States); Lenschow, Donald [National Center for Atmospheric Research, Boulder, CO (United States)

    2015-07-15

    The periodic properties of surface ozone variation were studied at five stations with different environmental conditions in Shanghai based on multi-year observations of ozone concentration and UV radiation using spectral decomposition methods. The spectra of surface ozone have distinct peaks at semi-diurnal, diurnal, intraseasonal, semiannual, annual, and quasi-biennial periods. The spectra for the frequency band larger than the semi-diurnal follow a − 5/3 power law at all the stations. The diurnal peak values for all stations in different years are similar to each other, while the semi-diurnal peak values are somewhat different among the stations. The peak value of semi-diurnal cycle at the station Dongtan (ecological environment area) is smaller than that at the other stations. The monthly mean of surface ozone has a significant seasonal variation with a maximum in May, a secondary maximum in fall, a lower value in summer (July and August), and a minimum in December or January. However the seasonal variation of UV radiation monthly mean shows a relatively higher value in summer (July and August), and for other months it is closely related to the ozone monthly mean. These secondary peaks of the ozone monthly mean in fall might be caused by the UV radiation coming back to its relevant value after falling off during the Asia summer monsoon; it was not related to biomass burning. The intraseasonal cycling of ozone might be related to the MJO (Madden–Julian Oscillation). Further studies are needed to understand the relationship between the local ozone intraseasonal variation and the MJO. The quasi-biennial variation of ozone in Shanghai might be a local reflection of climate change and could be associated with ENSO (El-Nino Southern Oscillation). Further studies will be needed to understand the relationship of the quasi-biennial variation of ozone to ENSO. - Highlights: • The spectral decomposition methods are used. • The spectra of surface ozone have multi

  6. Multi-year ozone concentration and its spectra in Shanghai, China

    International Nuclear Information System (INIS)

    Geng, Fuhai; Mao, Xiaoqin; Zhou, Mingyu; Zhong, Shiyuan; Lenschow, Donald

    2015-01-01

    The periodic properties of surface ozone variation were studied at five stations with different environmental conditions in Shanghai based on multi-year observations of ozone concentration and UV radiation using spectral decomposition methods. The spectra of surface ozone have distinct peaks at semi-diurnal, diurnal, intraseasonal, semiannual, annual, and quasi-biennial periods. The spectra for the frequency band larger than the semi-diurnal follow a − 5/3 power law at all the stations. The diurnal peak values for all stations in different years are similar to each other, while the semi-diurnal peak values are somewhat different among the stations. The peak value of semi-diurnal cycle at the station Dongtan (ecological environment area) is smaller than that at the other stations. The monthly mean of surface ozone has a significant seasonal variation with a maximum in May, a secondary maximum in fall, a lower value in summer (July and August), and a minimum in December or January. However the seasonal variation of UV radiation monthly mean shows a relatively higher value in summer (July and August), and for other months it is closely related to the ozone monthly mean. These secondary peaks of the ozone monthly mean in fall might be caused by the UV radiation coming back to its relevant value after falling off during the Asia summer monsoon; it was not related to biomass burning. The intraseasonal cycling of ozone might be related to the MJO (Madden–Julian Oscillation). Further studies are needed to understand the relationship between the local ozone intraseasonal variation and the MJO. The quasi-biennial variation of ozone in Shanghai might be a local reflection of climate change and could be associated with ENSO (El-Nino Southern Oscillation). Further studies will be needed to understand the relationship of the quasi-biennial variation of ozone to ENSO. - Highlights: • The spectral decomposition methods are used. • The spectra of surface ozone have multi

  7. WANO ready to begin 'multi-year effort' to expand operations

    Energy Technology Data Exchange (ETDEWEB)

    Dalton, David [NucNet, Brussels (Belgium)

    2016-01-15

    Ten of the 12 major projects established by the World Association of Nuclear Operators (WANO) following the Fukushima-Daiichi nuclear accident in 2011 have been completed. WANO chief executive officer Ken Ellis said that the closure of the projects means WANO had correct shortfalls that contributed to its inability to identify and direct the global industry support necessary to have prevented the Fukushima-Daiichi accident.

  8. Genomic prediction in early selection stages using multi-year data in a hybrid rye breeding program.

    Science.gov (United States)

    Bernal-Vasquez, Angela-Maria; Gordillo, Andres; Schmidt, Malthe; Piepho, Hans-Peter

    2017-05-31

    The use of multiple genetic backgrounds across years is appealing for genomic prediction (GP) because past years' data provide valuable information on marker effects. Nonetheless, single-year GP models are less complex and computationally less demanding than multi-year GP models. In devising a suitable analysis strategy for multi-year data, we may exploit the fact that even if there is no replication of genotypes across years, there is plenty of replication at the level of marker loci. Our principal aim was to evaluate different GP approaches to simultaneously model genotype-by-year (GY) effects and breeding values using multi-year data in terms of predictive ability. The models were evaluated under different scenarios reflecting common practice in plant breeding programs, such as different degrees of relatedness between training and validation sets, and using a selected fraction of genotypes in the training set. We used empirical grain yield data of a rye hybrid breeding program. A detailed description of the prediction approaches highlighting the use of kinship for modeling GY is presented. Using the kinship to model GY was advantageous in particular for datasets disconnected across years. On average, predictive abilities were 5% higher for models using kinship to model GY over models without kinship. We confirmed that using data from multiple selection stages provides valuable GY information and helps increasing predictive ability. This increase is on average 30% higher when the predicted genotypes are closely related with the genotypes in the training set. A selection of top-yielding genotypes together with the use of kinship to model GY improves the predictive ability in datasets composed of single years of several selection cycles. Our results clearly demonstrate that the use of multi-year data and appropriate modeling is beneficial for GP because it allows dissecting GY effects from genomic estimated breeding values. The model choice, as well as ensuring

  9. Tank Waste Remediation System fiscal year 1996 multi-year program plan WBS 1.1. Revision 1, Appendix A

    International Nuclear Information System (INIS)

    1995-09-01

    This document is a compilation of data relating to the Tank Waste Remediation System Multi-Year Program. Topics discussed include: management systems; waste volume, transfer and evaporation management; transition of 200 East and West areas; ferricyanide, volatile organic vapor, and flammable gas management; waste characterization; retrieval from SSTs and DSTs; heat management; interim storage; low-level and high-level radioactive waste management; and tank farm closure

  10. Tank waste remediation system fiscal year 1998 multi-year work plan WBS 1.1

    Energy Technology Data Exchange (ETDEWEB)

    Lenseigne, D. L.

    1997-09-15

    The TWRS Project Mission is to manage and immobilize for disposal the Hanford Site radioactive tank waste and cesium (Cs)/strontium (Sr) capsules in a safe, environmentally sound, and cost-effective manner. The scope includes all activities needed to (1) resolve safety issues; (2) operate, maintain, and upgrade the tank farms and supporting infrastructure; (3) characterize, retrieve, pretreat, and immobilize the waste for disposal and tank farm closure; and (4) use waste minimization and evaporation to manage tank waste volumes to ensure that the tank capacities of existing DSTs are not exceeded. The TWRS Project is responsible for closure of assigned operable units and D&D of TWRS facilities.

  11. Multi-year evaluation of mating disruption treatments against gypsy moth

    Science.gov (United States)

    Patrick C. Tobin; Kevin W. Thorpe; Laura M. Blackburn

    2007-01-01

    Mating disruption is the use of synthetic pheromone flakes that are aerially applied to foliage with the goal of interfering with male gypsy moths? ability to locate females and mate. Mating disruption is the primary tactic against gypsy moth used in the Gypsy Moth Slow-the-Spread Project (STS) [Tobin et al. 2004. Amer. Entomol. 50:200].

  12. Solid Waste Program Fiscal Year 1996 Multi-Year Program Plan WBS 1.2.1, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document contains the Fiscal Year 1996 Multi-Year Program Plan for the Solid Waste Program at the Hanford Reservation in Richland, Washington. The Solid Waste Program treats, stores, and disposes of a wide variety of solid wastes consisting of radioactive, nonradioactive and hazardous material types. Solid waste types are typically classified as transuranic waste, low-level radioactive waste, low-level mixed waste, and non-radioactive hazardous waste. This report describes the mission, goals and program strategies for the Solid Waste Program for fiscal year 1996 and beyond.

  13. Solid Waste Program Fiscal Year 1996 Multi-Year Program Plan WBS 1.2.1, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This document contains the Fiscal Year 1996 Multi-Year Program Plan for the Solid Waste Program at the Hanford Reservation in Richland, Washington. The Solid Waste Program treats, stores, and disposes of a wide variety of solid wastes consisting of radioactive, nonradioactive and hazardous material types. Solid waste types are typically classified as transuranic waste, low-level radioactive waste, low-level mixed waste, and non-radioactive hazardous waste. This report describes the mission, goals and program strategies for the Solid Waste Program for fiscal year 1996 and beyond

  14. Site Outcomes Baseline Multi Year Work Plan Volume 1, River Corridor Restoration Baseline

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The River Corridor Restoration volume is a compilation of Hanford Site scope, which excludes the approximately 194 km 2 Central Plateau. The River Corridor scope is currently contractually assigned to Fluor Hanford, Bechtel Hanford, inc., DynCorp, and Pacific Northwest National Laboratory, and others. The purpose of this project specification is to provide an overall scoping document for the River Corridor Restoration volume, and to provide a link with the overall Hanford Site River Corridor scope. Additionally, this specification provides an integrated and consolidated source of information for the various scopes, by current contract, for the River Corridor Restoration Baseline. It identifies the vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards

  15. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  16. Bright is the New Black - Multi-Year Performance of Generic High-Albedo Roofs in an Urban Climate

    Science.gov (United States)

    Gaffin, S. R.; Imhoff, M.; Rosenzweig, C.; Khanbilvardi, R.; Pasqualini, A.; Kong, A. Y. Y.; Grillo, D.; Freed, A.; Hillel, D.; Hartung, E.

    2012-01-01

    High-albedo white and cool roofing membranes are recognized as a fundamental strategy that dense urban areas can deploy on a large scale, at low cost, to mitigate the urban heat island effect. We are monitoring three generic white membranes within New York City that represent a cross-section of the dominant white membrane options for U.S. flat roofs: (1) an ethylene propylene diene monomer (EPDM) rubber membrane; (2) a thermoplastic polyolefin (TPO) membrane and; (3) an asphaltic multi-ply built-up membrane coated with white elastomeric acrylic paint. The paint product is being used by New York City s government for the first major urban albedo enhancement program in its history. We report on the temperature and related albedo performance of these three membranes at three different sites over a multi-year period. The results indicate that the professionally installed white membranes are maintaining their temperature control effectively and are meeting the Energy Star Cool Roofing performance standards requiring a three-year aged albedo above 0.50. The EPDM membrane however shows evidence of low emissivity. The painted asphaltic surface shows high emissivity but lost about half of its initial albedo within two years after installation. Given that the acrylic approach is an important "do-it-yourself," low-cost, retrofit technique, and, as such, offers the most rapid technique for increasing urban albedo, further product performance research is recommended to identify conditions that optimize its long-term albedo control. Even so, its current multi-year performance still represents a significant albedo enhancement for urban heat island mitigation.

  17. Multi-year longitudinal profiles of cortisol and corticosterone recovered from baleen of North Atlantic right whales (Eubalaena glacialis).

    Science.gov (United States)

    Hunt, Kathleen E; Lysiak, Nadine S; Moore, Michael; Rolland, Rosalind M

    2017-12-01

    Research into stress physiology of mysticete whales has been hampered by difficulty in obtaining repeated physiological samples from individuals over time. We investigated whether multi-year longitudinal records of glucocorticoids can be reconstructed from serial sampling along full-length baleen plates (representing ∼10years of baleen growth), using baleen recovered from two female North Atlantic right whales (Eubalaena glacialis) of known reproductive history. Cortisol and corticosterone were quantified with immunoassay of subsamples taken every 4cm (representing ∼60d time intervals) along a full-length baleen plate from each female. In both whales, corticosterone was significantly elevated during known pregnancies (inferred from calf sightings and necropsy data) as compared to intercalving intervals; cortisol was significantly elevated during pregnancies in one female but not the other. Within intercalving intervals, corticosterone was significantly elevated during the first year (lactation year) and/or the second year (post-lactation year) as compared to later years of the intercalving interval, while cortisol showed more variable patterns. Cortisol occasionally showed brief high elevations ("spikes") not paralleled by corticosterone, suggesting that the two glucocorticoids might be differentially responsive to certain stressors. Generally, immunoreactive corticosterone was present in higher concentration in baleen than immunoreactive cortisol; corticosterone:cortisol ratio was usually >4 and was highly variable in both individuals. Further investigation of baleen cortisol and corticosterone profiles could prove fruitful for elucidating long-term, multi-year patterns in stress physiology of large whales, determined retrospectively from stranded or archived specimens. Copyright © 2017 Elsevier Inc. All rights reserved.

  18. Energy transition and green growth. Segolene Royal accelerates the development of solar energy in France in order to reach the objectives of the Energy Multi-year Program (PPE) - Press file

    International Nuclear Information System (INIS)

    2017-01-01

    After a brief recall of the characteristics of the first public tender for the development of high power ground-based photovoltaic plants, and of some average characteristics of the retained projects, this document proposes a table containing the number of project and the global power level per region, and some key data regarding annual production, investments, the average efficiency, and average price for the different types of installation. The second part presents the same information for the second public tender which concerned renewable installations in situation of self-consumption. The third part briefly presents the third multi-year public tender which also concerns renewable installations in self-consumption. The fourth part briefly presents the first public tender on innovating solar installations (innovation must relate to components, to the electric system, to the optimisation and electric operation of the photovoltaic plant, and to the possibility of coupling a secondary photovoltaic production to a primary farm production)

  19. Analysis of the Effect of Interior Nudging on Temperature and Precipitation Distributions of Multi-year Regional Climate Simulations

    Science.gov (United States)

    Nolte, C. G.; Otte, T. L.; Bowden, J. H.; Otte, M. J.

    2010-12-01

    There is disagreement in the regional climate modeling community as to the appropriateness of the use of internal nudging. Some investigators argue that the regional model should be minimally constrained and allowed to respond to regional-scale forcing, while others have noted that in the absence of interior nudging, significant large-scale discrepancies develop between the regional model solution and the driving coarse-scale fields. These discrepancies lead to reduced confidence in the ability of regional climate models to dynamically downscale global climate model simulations under climate change scenarios, and detract from the usability of the regional simulations for impact assessments. The advantages and limitations of interior nudging schemes for regional climate modeling are investigated in this study. Multi-year simulations using the WRF model driven by reanalysis data over the continental United States at 36km resolution are conducted using spectral nudging, grid point nudging, and for a base case without interior nudging. The means, distributions, and inter-annual variability of temperature and precipitation will be evaluated in comparison to regional analyses.

  20. Bacterial communities from Arctic seasonal sea ice are more compositionally variable than those from multi-year sea ice.

    Science.gov (United States)

    Hatam, Ido; Lange, Benjamin; Beckers, Justin; Haas, Christian; Lanoil, Brian

    2016-10-01

    Arctic sea ice can be classified into two types: seasonal ice (first-year ice, FYI) and multi-year ice (MYI). Despite striking differences in the physical and chemical characteristics of FYI and MYI, and the key role sea ice bacteria play in biogeochemical cycles of the Arctic Ocean, there are a limited number of studies comparing the bacterial communities from these two ice types. Here, we compare the membership and composition of bacterial communities from FYI and MYI sampled north of Ellesmere Island, Canada. Our results show that communities from both ice types were dominated by similar class-level phylogenetic groups. However, at the operational taxonomic unit (OTU) level, communities from MYI and FYI differed in both membership and composition. Communities from MYI sites had consistent structure, with similar membership (presence/absence) and composition (OTU abundance) independent of location and year of sample. By contrast, communities from FYI were more variable. Although FYI bacterial communities from different locations and different years shared similar membership, they varied significantly in composition. Should these findings apply to sea ice across the Arctic, we predict increased compositional variability in sea ice bacterial communities resulting from the ongoing transition from predominantly MYI to FYI, which may impact nutrient dynamics in the Arctic Ocean.

  1. A Multi-Year Plan for Enhancing Turbulence Modeling in Hydra-TH Revised and Updated Version 2.0

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Thomas M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Berndt, Markus [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Baglietto, Emilio [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States); Magolan, Ben [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States)

    2015-10-01

    The purpose of this report is to document a multi-year plan for enhancing turbulence modeling in Hydra-TH for the Consortium for Advanced Simulation of Light Water Reactors (CASL) program. Hydra-TH is being developed to the meet the high- fidelity, high-Reynolds number CFD based thermal hydraulic simulation needs of the program. This work is being conducted within the thermal hydraulics methods (THM) focus area. This report is an extension of THM CASL milestone L3:THM.CFD.P10.02 [33] (March, 2015) and picks up where it left off. It will also serve to meet the requirements of CASL THM level three milestone, L3:THM.CFD.P11.04, scheduled for completion September 30, 2015. The objectives of this plan will be met by: maturation of recently added turbulence models, strategic design/development of new models and systematic and rigorous testing of existing and new models and model extensions. While multi-phase turbulent flow simulations are important to the program, only single-phase modeling will be considered in this report. Large Eddy Simulation (LES) is also an important modeling methodology. However, at least in the first year, the focus is on steady-state Reynolds Averaged Navier-Stokes (RANS) turbulence modeling.

  2. Multi-year climate variability in the Southwestern United States within a context of a dynamically downscaled twentieth century reanalysis

    Science.gov (United States)

    Carrillo, Carlos M.; Castro, Christopher L.; Chang, Hsin-I.; Luong, Thang M.

    2017-12-01

    This investigation evaluates whether there is coherency in warm and cool season precipitation at the low-frequency scale that may be responsible for multi-year droughts in the US Southwest. This low-frequency climate variability at the decadal scale and longer is studied within the context of a twentieth-century reanalysis (20CR) and its dynamically-downscaled version (DD-20CR). A spectral domain matrix methods technique (Multiple-Taper-Method Singular Value Decomposition) is applied to these datasets to identify statistically significant spatiotemporal precipitation patterns for the cool (November-April) and warm (July-August) seasons. The low-frequency variability in the 20CR is evaluated by exploring global to continental-scale spatiotemporal variability in moisture flux convergence (MFC) to the occurrence of multiyear droughts and pluvials in Central America, as this region has a demonstrated anti-phase relationship in low-frequency climate variability with northern Mexico and the southwestern US By using the MFC in lieu of precipitation, this study reveals that the 20CR is able to resolve well the low-frequency, multiyear climate variability. In the context of the DD-20CR, multiyear droughts and pluvials in the southwestern US (in the early twentieth century) are significantly related to this low-frequency climate variability. The precipitation anomalies at these low-frequency timescales are in phase between the cool and warm seasons, consistent with the concept of dual-season drought as has been suggested in tree ring studies.

  3. Multi-Year Impacts of Ecotourism on Whale Shark (Rhincodon typus) Visitation at Ningaloo Reef, Western Australia.

    Science.gov (United States)

    Sanzogni, R L; Meekan, M G; Meeuwig, J J

    2015-01-01

    In-water viewing of sharks by tourists has become a popular and lucrative industry. There is some concern that interactions with tourists with ecotourism operations might harm sharks through disruption of behaviours. Here, we analysed five years of whale shark (Rhincodon typus) encounter data by an ecotourism industry at Ningaloo Reef, Western Australia, to assess the impact of ecotourism interactions on shark visitation, within the context of the biological and physical oceanography of the region. Our data base consisted of 2823 encounter records for 951 individual whale sharks collected by ecotourism operators between 2007 and 2011. We found that total encounters per whale shark and encounters per boat trip increased through time. On average, whale sharks re-encountered in subsequent years were encountered earlier, stayed longer and tended to be encountered more often within a season than sharks that were only encountered in a single year. Sequential comparisons between years did not show any patterns consistent with disturbance and the rate of departure of whale sharks from the aggregation was negatively correlated to the number of operator trips. Overall, our analysis of this multi-year data base found no evidence that interactions with tourists affected the likelihood of whale shark re-encounters and that instead, physical and biological environmental factors had a far greater influence on whale shark visitation rates. Our approach provides a template for assessing the effects of ecotourism interactions and environmental factors on the visitation patterns of marine megafauna over multiple years.

  4. The Benefits of Multi-Year Research Experiences: Differences in Novice and Experienced Students’ Reported Gains from Undergraduate Research

    Science.gov (United States)

    Thiry, Heather; Weston, Timothy J.; Laursen, Sandra L.; Hunter, Anne-Barrie

    2012-01-01

    This mixed-methods study explores differences in novice and experienced undergraduate students’ perceptions of their cognitive, personal, and professional gains from engaging in scientific research. The study was conducted in four different undergraduate research (UR) programs at two research-extensive universities; three of these programs had a focus on the biosciences. Seventy-three entry-level and experienced student researchers participated in in-depth, semi-structured interviews and completed the quantitative Undergraduate Research Student Self-Assessment (URSSA) instrument. Interviews and surveys assessed students’ developmental outcomes from engaging in UR. Experienced students reported distinct personal, professional, and cognitive outcomes relative to their novice peers, including a more sophisticated understanding of the process of scientific research. Students also described the trajectories by which they developed not only the intellectual skills necessary to advance in science, but also the behaviors and temperament necessary to be a scientist. The findings suggest that students benefit from multi-year UR experiences. Implications for UR program design, advising practices, and funding structures are discussed. PMID:22949423

  5. Decree nr 2017-457 of 30 March 2017 related to Guyana energy multi-year programming

    International Nuclear Information System (INIS)

    Sapin, Michel; Bareigts, Ericka

    2017-01-01

    The decree defines objectives of energy efficiency and reduction of fossil energy consumption, and of development of energy production from renewable energies, addresses issues related to security of supply and to the balance between supply and demand, to access to electric power, and to studies on infrastructures. As appendix, the text of the 2016-2018 and 2019-2023 energy multi-year programming (PPE) for Guyana is provided. This document first presents the Guyana energy system: history and energy assessment for 2014, legal and regulatory framework specific to Guyana, European and international context, power production costs. It analyses the energy demand: past evolution, determining factors of supply evolution, objectives of strengthening energy efficiency measures, objectives of reduction of energy poverty, objectives of reduction of primary fossil energy consumption. The third part addresses objectives of security of supply (for fuel, other fossil energies, and electricity). The next part analyses the energy supply: stakes, quantitative objectives for biomass, waste valorisation, hydraulic and other energy sources, objectives of development of renewable energies. It discusses the issue of connection of inland communes to the network, and issues related to energy infrastructure and networks

  6. Development of multi-year land cover data to assess wildfire impacts to coastal watersheds and the nearshore environment

    Science.gov (United States)

    Morrison, Katherine D.

    In the Mediterranean ecosystems of coastal California, wildfire is a common disturbance that can significantly alter vegetation in watersheds that transport sediment and nutrients to the adjacent nearshore oceanic environment. We assess the impact of two wildfires that burned in 2008 on land cover and to the nearshore environment along the Big Sur coast in central California. We created a multi-year land cover dataset to assess changes to coastal watersheds as a result of fire. This land cover dataset was then used to model changes in nonpoint source pollutants transported to the nearshore environment. Results indicate post-fire increases in percent export compared to pre-fire years and also link wildfire severity to the specific land cover changes that subsequently increase exports of pollutants and sediment to the nearshore environment. This approach is a replicable across watersheds and also provides a framework for including the nearshore environment as a value at risk terrestrial land management revolving around wildfire, including suppression, thinning, and other activities that change land cover at a landscape scale.

  7. The value of a poison control center in preventing unnecessary ED visits and hospital charges: A multi-year analysis.

    Science.gov (United States)

    Tak, Casey R; Malheiro, Marty C; Bennett, Heather K W; Crouch, Barbara I

    2017-03-01

    The purpose of this study is to determine the economic value of the Utah Poison Control Center (UPCC) by examining its contribution to the reduction of unnecessary emergency department (ED) visits and associated charges across multiple years. A multi-year (2009-2014) analysis of cross-sectional data was performed. Callers were asked what they would do for a poison emergency if the UPCC was not available. Healthcare charges for ED visits averted were calculated according to insurance status using charges obtained from a statewide database. Of the 10,656 survey attempts, 5018 were completed. Over 30,000 cases were managed on-site each year. Using the proportion of callers who noted they would call 911, visit an ED, or call a physician's office, between 20.0 and 24.2 thousand ED visits were potentially prevented each year of the survey. Between $16.6 and $24.4 million dollars in unnecessary healthcare charges were potentially averted annually. Compared to the cost of operation, the service UPCC provides demonstrates economic value by reducing ED visits and associated charges. As the majority of patients have private insurance, the largest benefit falls to private payers. Copyright © 2016 Elsevier Inc. All rights reserved.

  8. AHP 47: TRICKING THE LANDLORD'S FRIEND

    Directory of Open Access Journals (Sweden)

    Tshe dbang rdo rje ཚེ་དབང་རྡོ་རྗེ། (Caixiangduojie 才项多杰

    2017-04-01

    Full Text Available One evening, when Lha mo's mother was walking to the toilet, she passed by Lha mo's room and heard strange panting sounds. Using a butter lamp, she opened the door and walked toward the sounds, and was shocked to see a naked man bouncing up and down on Lha mo. She was so startled that the butter lamp flew into the air as she squealed, "Help! Help! A thief is in my daughter's room!" ...

  9. A Stabilizing Feedback Between Cloud Radiative Effects and Greenland Surface Melt: Verification From Multi-year Automatic Weather Station Measurements

    Science.gov (United States)

    Zender, C. S.; Wang, W.; van As, D.

    2017-12-01

    Clouds have strong impacts on Greenland's surface melt through the interaction with the dry atmosphere and reflective surfaces. However, their effects are uncertain due to the lack of in situ observations. To better quantify cloud radiative effects (CRE) in Greenland, we analyze and interpret multi-year radiation measurements from 30 automatic weather stations encompassing a broad range of climatological and topographical conditions. During melt season, clouds warm surface over most of Greenland, meaning the longwave greenhouse effect outweighs the shortwave shading effect; on the other hand, the spatial variability of net (longwave and shortwave) CRE is dominated by shortwave CRE and in turn by surface albedo, which controls the potential absorption of solar radiation when clouds are absent. The net warming effect decreases with shortwave CRE from high to low altitudes and from north to south (Fig. 1). The spatial correlation between albedo and net CRE is strong (r=0.93, palbedo determines the net CRE seasonal trend, which decreases from May to July and increases afterwards. On an hourly timescale, we find two distinct radiative states in Greenland (Fig. 2). The clear state is characterized by clear-sky conditions or thin clouds, when albedo and solar zenith angle (SZA) weakly correlates with CRE. The cloudy state is characterized by opaque clouds, when the combination of albedo and SZA strongly correlates with CRE (r=0.85, palbedo and solar zenith angle, explains the majority of the CRE variation in spatial distribution, seasonal trend in the ablation zone, and in hourly variability in the cloudy radiative state. Clouds warm the brighter and colder surfaces of Greenland, enhance snow melt, and tend to lower the albedo. Clouds cool the darker and warmer surfaces, inhibiting snow melt, which increases albedo, and thus stabilizes surface melt. This stabilizing mechanism may also occur over sea ice, helping to forestall surface melt as the Arctic becomes dimmer.

  10. Regional-scale assessment of soil salinity in the Red River Valley using multi-year MODIS EVI and NDVI.

    Science.gov (United States)

    Lobell, D B; Lesch, S M; Corwin, D L; Ulmer, M G; Anderson, K A; Potts, D J; Doolittle, J A; Matos, M R; Baltes, M J

    2010-01-01

    The ability to inventory and map soil salinity at regional scales remains a significant challenge to scientists concerned with the salinization of agricultural soils throughout the world. Previous attempts to use satellite or aerial imagery to assess soil salinity have found limited success in part because of the inability of methods to isolate the effects of soil salinity on vegetative growth from other factors. This study evaluated the use of Moderate Resolution Imaging Spectroradiometer (MODIS) imagery in conjunction with directed soil sampling to assess and map soil salinity at a regional scale (i.e., 10-10(5) km(2)) in a parsimonious manner. Correlations with three soil salinity ground truth datasets differing in scale were made in Kittson County within the Red River Valley (RRV) of North Dakota and Minnesota, an area where soil salinity assessment is a top priority for the Natural Resource Conservation Service (NRCS). Multi-year MODIS imagery was used to mitigate the influence of temporally dynamic factors such as weather, pests, disease, and management influences. The average of the MODIS enhanced vegetation index (EVI) for a 7-yr period exhibited a strong relationship with soil salinity in all three datasets, and outperformed the normalized difference vegetation index (NDVI). One-third to one-half of the spatial variability in soil salinity could be captured by measuring average MODIS EVI and whether the land qualified for the Conservation Reserve Program (a USDA program that sets aside marginally productive land based on conservation principles). The approach has the practical simplicity to allow broad application in areas where limited resources are available for salinity assessment.

  11. Colloid Microthruster Feed System Development for Fine Pointing and Drag-Free Control of Multi-Year Astronomical Observatories

    Science.gov (United States)

    Ziemer, John; Mueller, J.; Spence, D.; Hruby, V.

    2014-01-01

    A new Colloid Microthruster feed system, including a propellant tank and redundant Microvalves, is being developed for fine pointing and drag-free operations of multi-year astronomical observatories under the PCOS SAT program. Almost all Gravitational Wave Observatory (GWO) concepts require microthrusters to maintain a drag-free environment for the inertial sensor instrument to meet the mission science objectives. The current state-of-the-art microthruster in the US is the Busek Colloid Micro-Newton Thruster (CMNT) originally developed under the New Millennium Program for the Space Technology 7 (ST7) and ESA's LISA Pathfinder (LPF) technology demonstration mission. The ST7 CMNT design includes a bellows propellant storage tank that is sized to provide up to 90 days of maximum thrust (30 µN). The new propellant tank is based on a blow-down, metal-diaphragm spherical tank design with enough capacity for a 5-year GWO mission. The new feed system will also include the third generation of Busek’s Microvalve, currently being developed under a NASA Phase II SBIR. The Microvalve is responsible for the picoliter per second control of the propellant from the tank to the thruster head, demanding parts with micron-level tolerances, critical alignments, and challenging acceptance test protocols. This microthruster system could also be considered for replacement of reaction wheels for slewing and fine pointing of other astronomical observatories, including Exo-Planet Observatory concepts. The goal of the PCOS SAT effort is to raise the new system to TRL 5 with performance and environmental testing within the next two years.

  12. A Multi-Year Dust Devil Vortex Survey Using an Automated Search of Pressure Time-Series

    Science.gov (United States)

    Jackson, Brian K.; Lorenz, Ralph

    2014-11-01

    Dust devils occur in arid climates on the Earth and ubiquitously on Mars, where they likely dominate the supply of atmospheric dust and influence climate. Martian dust devils have been studied with a combination of orbiting and landed spacecraft, while most studies of terrestrial dust devils have involved manned monitoring of field sites, which can be costly both in time and personnel. As an alternative approach, we describe a multi-year in-situ survey of terrestrial dust devils using pressure loggers deployed at El Dorado Playa in Nevada, USA, a site known for dust devil activity. Analogous to previous surveys for Martian dust devils, we conduct a post-hoc analysis of the barometric data to search for putative dust devil pressure dips using a new automated detection algorithm. We investigate the completeness and false positive rates of our new algorithm and conduct several statistically robust analyses of the resulting population of dips. We also investigate seasonal, annual, and spatial variability of the putative dust devil dips, possible correlations with precipitation, and the influence of sample size on the derived population statistics. Our results suggest that large numbers of dips (> 1,000) collected over multiple seasons are probably required for accurate assessment of the underlying dust devil population. Correlating long-term barometric time-series with other data streams (e.g., solar flux measurements from photovoltaic cells) can uniquely elucidate the natures and origins of dust devils, and accurately assessing their influence requires consideration of the full distribution of dust devil properties, rather than average values. For example, our results suggest the dust flux from the average terrestrial devil is nearly 1,000 times smaller than the (more representative) population-weighted average flux. If applicable to Martian dust devils, such corrections may help resolve purported discrepancies between the dust fluxes estimated from dust devil studies

  13. 0-6683 : develop a pavement project evaluation index to support the 4-year pavement management plan.

    Science.gov (United States)

    2013-08-01

    A pavement management plan (PMP) identifies : candidate maintenance and rehabilitation (M&R) : projects for a particular roadway network over a : multi-year planning period. The PMP is a living : document because projects are reevaluated and : reprio...

  14. Multi-year analysis of distributed glacier mass balance modelling and equilibrium line altitude on King George Island, Antarctic Peninsula

    Science.gov (United States)

    Falk, Ulrike; López, Damián A.; Silva-Busso, Adrián

    2018-04-01

    The South Shetland Islands are located at the northern tip of the Antarctic Peninsula (AP). This region was subject to strong warming trends in the atmospheric surface layer. Surface air temperature increased about 3 K in 50 years, concurrent with retreating glacier fronts, an increase in melt areas, ice surface lowering and rapid break-up and disintegration of ice shelves. The positive trend in surface air temperature has currently come to a halt. Observed surface air temperature lapse rates show a high variability during winter months (standard deviations up to ±1.0 K (100 m)-1) and a distinct spatial heterogeneity reflecting the impact of synoptic weather patterns. The increased mesocyclonic activity during the wintertime over the past decades in the study area results in intensified advection of warm, moist air with high temperatures and rain and leads to melt conditions on the ice cap, fixating surface air temperatures to the melting point. Its impact on winter accumulation results in the observed negative mass balance estimates. Six years of continuous glaciological measurements on mass balance stake transects as well as 5 years of climatological data time series are presented and a spatially distributed glacier energy balance melt model adapted and run based on these multi-year data sets. The glaciological surface mass balance model is generally in good agreement with observations, except for atmospheric conditions promoting snow drift by high wind speeds, turbulence-driven snow deposition and snow layer erosion by rain. No drift in the difference between simulated mass balance and mass balance measurements can be seen over the course of the 5-year model run period. The winter accumulation does not suffice to compensate for the high variability in summer ablation. The results are analysed to assess changes in meltwater input to the coastal waters, specific glacier mass balance and the equilibrium line altitude (ELA). The Fourcade Glacier catchment drains

  15. Multi-year (2004–2008 record of nonmethane hydrocarbons and halocarbons in New England: seasonal variations and regional sources

    Directory of Open Access Journals (Sweden)

    R. S. Russo

    2010-05-01

    Full Text Available Multi-year time series records of C2-C6 alkanes, C2-C4 alkenes, ethyne, isoprene, C6-C8 aromatics, trichloroethene (C2HCl3, and tetrachloroethene (C2Cl4 from canister samples collected during January 2004–February 2008 at the University of New Hampshire (UNH AIRMAP Observatory at Thompson Farm (TF in Durham, NH are presented. The objectives of this work are to identify the sources of nonmethane hydrocarbons (NMHCs and halocarbons observed at TF, characterize the seasonal and interannual variability in ambient mixing ratios and sources, and estimate regional emission rates of NMHCs. Analysis of correlations and comparisons with emission ratios indicated that a ubiquitous and persistent mix of emissions from several anthropogenic sources is observed throughout the entire year. The highest C2-C8 anthropogenic NMHC mixing ratios were observed in mid to late winter. Following the springtime minimums, the C3-C6 alkanes, C7-C8 aromatics, and C2HCl3 increased in early to mid summer, presumably reflecting enhanced evaporative emissions. Mixing ratios of C2Cl4 and C2HCl3 decreased by 0.7±0.2 and 0.3±0.05 pptv/year, respectively, which is indicative of reduced usage and emissions of these halogenated solvents. Emission rates of C3-C8 NMHCs were estimated to be 109 to 1010 molecules cm−2 s−1 in winter 2006. The emission rates extrapolated to the state of New Hampshire and New England were ~2–60 Mg/day and ~12–430 Mg/day, respectively. Emission rates of benzene, toluene, ethylbenzene, xylenes, and ethyne in the 2002 and 2005 EPA National Emissions Inventories were within ±50% of the TF emission rates.

  16. Insights on nitrate sources at Dome C (East Antarctic Plateau from multi-year aerosol and snow records

    Directory of Open Access Journals (Sweden)

    Rita Traversi

    2014-06-01

    Full Text Available Here we present the first multi-year record of nitrate in the atmospheric aerosol (2005–2008 and surface snow (2006–08 from central Antarctica. PM10 and size-segregated aerosol, together with superficial snow, have been collected all year-round at high resolution (daily for all the snow samples and for most of aerosol samples at Dome C since the 2004/05 field season and analysed for main and trace ionic markers. The suitability of the sampling location in terms of possible contamination from the base is shown in detail. In spite of the relevance of nitrate in Antarctic atmosphere, both for better understanding the chemistry of N cycle in the plateau boundary layer and for improving the interpretation of long-term nitrate records from deep ice core records, nitrate sources in Antarctica are not well constrained yet, neither in extent nor in timing. A recurring seasonal pattern was pointed out in both aerosol and snow records, showing summer maxima and winter minima, although aerosol maxima lead the snow ones of 1–2 months, possibly due to a higher acidity in the atmosphere in mid-summer, favouring the repartition of nitrate as nitric acid and thus its uptake by the surface snow layers. On the basis of a meteorological analysis of one major nitrate event, of data related to PSC I extent and of irradiance values, we propose that the high nitrate summer levels in aerosol and snow are likely due to a synergy of enhanced source of nitrate and/or its precursors (such as the stratospheric inputs, higher solar irradiance and higher oxidation rates in this season. Moreover, we show here a further evidence of the substantial contribution of HNO3/NOx re-emission from the snowpack, already shown in previous works, and which can explain a significant fraction of atmospheric nitrate, maintaining the same seasonal pattern in the snow. As concerning snow specifically, the presented data suggest that nitrate is likely to be controlled mainly by atmospheric

  17. Leading quality through the development of a multi-year corporate quality plan: sharing The Ottawa Hospital experience.

    Science.gov (United States)

    Hunter, Linda; Myles, Joanne; Worthington, James R; Lebrun, Monique

    2011-01-01

    This article discusses the background and process for developing a multi-year corporate quality plan. The Ottawa Hospital's goal is to be a top 10% performer in quality and patient safety in North America. In order to create long-term measurable and sustainable changes in the quality of patient care, The Ottawa Hospital embarked on the development of a three-year strategic corporate quality plan. This was accomplished by engaging the organization at all levels and defining quality frameworks, aligning with internal and external expectations, prioritizing strategic goals, articulating performance measurements and reporting to stakeholders while maintaining a transparent communication process. The plan was developed through an iterative process that engaged a broad base of health professionals, physicians, support staff, administration and senior management. A literature review of quality frameworks was undertaken, a Quality Plan Working Group was established, 25 key stakeholder interviews were conducted and 48 clinical and support staff consultations were held. The intent was to gather information on current quality initiatives and challenges encountered and to prioritize corporate goals and then create the quality plan. Goals were created and then prioritized through an affinity exercise. Action plans were developed for each goal and included objectives, tasks and activities, performance measures (structure, process and outcome), accountabilities and timelines. This collaborative methodology resulted in the development of a three-year quality plan. Six corporate goals were outlined by the tenets of the quality framework for The Ottawa Hospital: access to care, appropriate care (effective and efficient), safe care and satisfaction with care. Each of the six corporate goals identified objectives and supporting action plans with accountabilities outlining what would be accomplished in years one, two and three. The three-year quality plan was approved by senior

  18. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond.

  19. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond

  20. Multi-year analysis of distributed glacier mass balance modelling and equilibrium line altitude on King George Island, Antarctic Peninsula

    Directory of Open Access Journals (Sweden)

    U. Falk

    2018-04-01

    Full Text Available The South Shetland Islands are located at the northern tip of the Antarctic Peninsula (AP. This region was subject to strong warming trends in the atmospheric surface layer. Surface air temperature increased about 3 K in 50 years, concurrent with retreating glacier fronts, an increase in melt areas, ice surface lowering and rapid break-up and disintegration of ice shelves. The positive trend in surface air temperature has currently come to a halt. Observed surface air temperature lapse rates show a high variability during winter months (standard deviations up to ±1.0 K (100 m−1 and a distinct spatial heterogeneity reflecting the impact of synoptic weather patterns. The increased mesocyclonic activity during the wintertime over the past decades in the study area results in intensified advection of warm, moist air with high temperatures and rain and leads to melt conditions on the ice cap, fixating surface air temperatures to the melting point. Its impact on winter accumulation results in the observed negative mass balance estimates. Six years of continuous glaciological measurements on mass balance stake transects as well as 5 years of climatological data time series are presented and a spatially distributed glacier energy balance melt model adapted and run based on these multi-year data sets. The glaciological surface mass balance model is generally in good agreement with observations, except for atmospheric conditions promoting snow drift by high wind speeds, turbulence-driven snow deposition and snow layer erosion by rain. No drift in the difference between simulated mass balance and mass balance measurements can be seen over the course of the 5-year model run period. The winter accumulation does not suffice to compensate for the high variability in summer ablation. The results are analysed to assess changes in meltwater input to the coastal waters, specific glacier mass balance and the equilibrium line altitude (ELA. The

  1. The CMEMS-Med-MFC-Biogeochemistry operational system: implementation of NRT and Multi-Year validation tools

    Science.gov (United States)

    Salon, Stefano; Cossarini, Gianpiero; Bolzon, Giorgio; Teruzzi, Anna

    2017-04-01

    The Mediterranean Monitoring and Forecasting Centre (Med-MFC) is one of the regional production centres of the EU Copernicus Marine Environment Monitoring Service (CMEMS). Med-MFC manages a suite of numerical model systems for the operational delivery of the CMEMS products, providing continuous monitoring and forecasting of the Mediterranean marine environment. The CMEMS products of fundamental biogeochemical variables (chlorophyll, nitrate, phosphate, oxygen, phytoplankton biomass, primary productivity, pH, pCO2) are organised as gridded datasets and are available at the marine.copernicus.eu web portal. Quantitative estimates of CMEMS products accuracy are prerequisites to release reliable information to intermediate users, end users and to other downstream services. In particular, validation activities aim to deliver accuracy information of the model products and to serve as a long term monitoring of the performance of the modelling systems. The quality assessment of model output is implemented using a multiple-stages approach, basically inspired to the classic "GODAE 4 Classes" metrics and criteria (consistency, quality, performance and benefit). Firstly, pre-operational runs qualify the operational model system against historical data, also providing a verification of the improvements of the new model system release with respect to the previous version. Then, the near real time (NRT) validation aims at delivering a sustained on-line skill assessment of the model analysis and forecast, relying on the NRT available relevant observations (e.g. in situ, Bio Argo and satellite observations). NRT validation results are operated on weekly basis and published on the MEDEAF web portal (www.medeaf.inogs.it). On a quarterly basis, the integration of the NRT validation activities delivers a comprehensive view of the accuracy of model forecast through the official CMEMS validation webpage. Multi-Year production (e.g. reanalysis runs) follows a similar procedure, and the

  2. The Impact of Student-Directed Projects in Introductory Statistics

    Science.gov (United States)

    Spence, Dianna J.; Bailey, Brad; Sharp, Julia L.

    2017-01-01

    A multi-year study investigated the impact of incorporating student-directed discovery projects into introductory statistics courses. Pilot instructors at institutions across the United States taught statistics implementing student-directed projects with the help of a common set of instructional materials designed to facilitate such projects.…

  3. Multi-Year Professional Development Grounded in Educative Curriculum Focused on Integrating Technology with Reformed Science Teaching Principles

    Science.gov (United States)

    Longhurst, Max L.; Coster, Daniel C.; Wolf, Paul G.; Duffy, Aaron M.; Lee, Hyunju; Campbell, Todd

    2016-01-01

    Visions of science teaching and learning in the newest U.S. standards documents are dramatically different than those found in most classrooms. This research addresses these differences through closely examining one professional development (PD) project that connects teacher learning and teacher practice with student learning/achievement. This…

  4. Using weighted trait indices to select the best performing broccoli hybrids in multi-site and multi-year trials

    Science.gov (United States)

    Understanding and implementing evaluation data from vegetable trials conducted across multiple years and environments by multiple raters presents numerous challenges. In order to select new broccoli hybrids suitable for eastern production, the SCRI East Coast Broccoli Project has conducted over 32 p...

  5. Transition projects FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP) WBS 1.3.1 and 7.1. Volume 4

    Energy Technology Data Exchange (ETDEWEB)

    Cartmell, D.B.

    1994-09-01

    This reference contains information about the deactivation of the Purex Process Plant located on the Hanford Reservation. This document consists of a tabular schedule of events covering the next three years.

  6. Transition projects FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP) WBS 1.3.1 and 7.1. Volume 4

    International Nuclear Information System (INIS)

    Cartmell, D.B.

    1994-09-01

    This reference contains information about the deactivation of the Purex Process Plant located on the Hanford Reservation. This document consists of a tabular schedule of events covering the next three years

  7. Transition projects FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP) WBS 1.3.1 and 7.1. Volume 2

    International Nuclear Information System (INIS)

    Cartmell, D.B.

    1994-09-01

    This document contains information concerning the management of the Hanford Reservation. Information concerning the departmental schedules is presented in chart form. The following departmental schedules are included: The B-plant/Cesium Capsule Recovery, 300 Area Fuel Supply Program, Plutonium Finishing Plant, and Program and Environmental Management

  8. A Multi-Year Data Set of Cloud Properties Derived for CERES from Aqua, Terra, and TRMM

    Science.gov (United States)

    Minnis, Patrick; Sunny Sun-Mack; Trepte, Quinz Z.; Yan Chen; Brown, Richard R.; Gibson, Sharon C.; Heck, Michael L.; Dong, Xiquan; Xi, Baike

    2007-01-01

    The Clouds and Earth's Radiant Energy System (CERES) Project is producing a suite of cloud properties from high-resolution imagers on several satellites and matching them precisely with broadband radiance data to study the influence of clouds and radiation on climate. The cloud properties generally compare well with independent validation sources. Distinct differences are found between the CERES cloud properties and those derived with other algorithms from the same imager data. CERES products will be updated beginning in late 2006.

  9. Production costs of the new French nuclear. SFEN contributions to Energy multi-year programming. Synthesis and recommendations

    International Nuclear Information System (INIS)

    2018-03-01

    This publication reports an analysis of the different parameters which make the nuclear option available for France by 2050. It aims at identifying the production cost of new nuclear production means, at identifying levers for action regarding building and financing to reach a sustainable competitiveness of the sector. This note is based on returns on experience from other industries and also on current EPR constructions in France, Finland and China. Thus, it focuses on third generation EPR. It discusses difficulties met during the first projects, states that managing the production is possible through the development of an industrial program, outlines the role of the State. The second part proposes a technical note which discusses building costs and delays of third generation reactors, outlines the importance of the building cost in the total electric power generation cost, shows that (based on an analysis of past building costs for second generation reactors) building costs can be mastered, discusses the expected evolution of EPR costs, evokes other factors influencing the kWh price, discusses the burden of investment financing in front of risks, discusses how to reduce market risks in order to attract investors (reform of carbon price, long term contracts for low carbon projects), and finally comments the consequences for the future nuclear investment which is required to renew the fleet

  10. 78 FR 63481 - Therapeutic Area Standards Initiative Project Plan; Availability

    Science.gov (United States)

    2013-10-24

    ... disadvantages of current and emerging alternatives for the exchange of regulated study data, and (2) issuing a... primary document for guiding all major aspects of FDA's multi-year initiative to develop and implement TA... is announcing the availability of the TA Project Plan. This TA Project Plan will be the primary...

  11. Dynamic patterns and ecological impacts of declining ocean pH in a high-resolution multi-year dataset.

    Science.gov (United States)

    Wootton, J Timothy; Pfister, Catherine A; Forester, James D

    2008-12-02

    Increasing global concentrations of atmospheric CO(2) are predicted to decrease ocean pH, with potentially severe impacts on marine food webs, but empirical data documenting ocean pH over time are limited. In a high-resolution dataset spanning 8 years, pH at a north-temperate coastal site declined with increasing atmospheric CO(2) levels and varied substantially in response to biological processes and physical conditions that fluctuate over multiple time scales. Applying a method to link environmental change to species dynamics via multispecies Markov chain models reveals strong links between in situ benthic species dynamics and variation in ocean pH, with calcareous species generally performing more poorly than noncalcareous species in years with low pH. The models project the long-term consequences of these dynamic changes, which predict substantial shifts in the species dominating the habitat as a consequence of both direct effects of reduced calcification and indirect effects arising from the web of species interactions. Our results indicate that pH decline is proceeding at a more rapid rate than previously predicted in some areas, and that this decline has ecological consequences for near shore benthic ecosystems.

  12. Multi-Year Program Plan FY'09-FY'15 Solid-State Lighting Research and Development

    Energy Technology Data Exchange (ETDEWEB)

    None

    2009-03-01

    President Obama's energy and environment agenda calls for deployment of 'the Cheapest, Cleanest, Fastest Energy Source - Energy Efficiency.' The Department of Energy's (DOE) Office of Energy Efficiency and Renewable Energy (EERE) plays a critical role in advancing the President's agenda by helping the United States advance toward an energy-efficient future. Lighting in the United States is projected to consume nearly 10 quads of primary energy by 2012.3 A nation-wide move toward solid-state lighting (SSL) for general illumination could save a total of 32.5 quads of primary energy between 2012 and 2027. No other lighting technology offers the DOE and our nation so much potential to save energy and enhance the quality of our built environment. The DOE has set forth the following mission statement for the SSL R&D Portfolio: Guided by a Government-industry partnership, the mission is to create a new, U.S.-led market for high-efficiency, general illumination products through the advancement of semiconductor technologies, to save energy, reduce costs and enhance the quality of the lighted environment.

  13. A multi-year analysis of passage and survival at McNary Dam, 2004-09

    Science.gov (United States)

    Adams, Noah S.; Walker, C.E.; Perry, R.W.

    2011-01-01

    We analyzed 6 years (2004–09) of passage and survival data collected at McNary Dam to determine how dam operations and environmental conditions affect passage and survival of juvenile salmonids. A multinomial logistic regression was used to examine how environmental variables and dam operations relate to passage behavior of juvenile salmonids at McNary Dam. We used the Cormack-Jolly-Seber release-recapture model to determine how the survival of juvenile salmonids passing through McNary Dam relates to environmental variables and dam operations. Total project discharge and the proportion of flow passing the spillway typically had a positive effect on survival for all species and routes. As the proportion of water through the spillway increased, the number of fish passing the spillway increased, as did overall survival. Additionally, survival generally was higher at night. There was no meaningful difference in survival for fish that passed through the north or south portions of the spillway or powerhouse. Similarly, there was no difference in survival for fish released in the north, middle, or south portions of the tailrace. For subyearling Chinook salmon migrating during the summer season, increased temperatures had a drastic effect on passage and survival. As temperature increased, survival of subyearling Chinook salmon decreased through all passage routes and the number of fish that passed through the turbines increased. During years when the temporary spillway weirs (TSWs) were installed, passage through the spillway increased for spring migrants. However, due to the changes made in the location of the TSW between years and the potential effect of other confounding environmental conditions, it is not certain if the increase in spillway passage was due solely to the presence of the TSWs. The TSWs appeared to improve forebay survival during years when they were operated.

  14. Diagnosis of inconsistencies in multi-year gridded precipitation data over mountainous areas and related impacts on hydrologic simulations

    Science.gov (United States)

    Mizukami, N.; Smith, M. B.

    2010-12-01

    It is common for the error characteristics of long-term precipitation data to change over time due to various factors such as gauge relocation and changes in data processing methods. The temporal consistency of precipitation data error characteristics is as important as data accuracy itself for hydrologic model calibration and subsequent use of the calibrated model for streamflow prediction. In mountainous areas, the generation of precipitation grids relies on sparse gage networks, the makeup of which often varies over time. This causes a change in error characteristics of the long-term precipitation data record. We will discuss the diagnostic analysis of the consistency of gridded precipitation time series and illustrate the adverse effect of inconsistent precipitation data on a hydrologic model simulation. We used hourly 4 km gridded precipitation time series over a mountainous basin in the Sierra Nevada Mountains of California from October 1988 through September 2006. The basin is part of the broader study area that served as the focus of the second phase of the Distributed Model Intercomparison Project (DMIP-2), organized by the U.S. National Weather Service (NWS) of the National Oceanographic and Atmospheric Administration (NOAA). To check the consistency of the gridded precipitation time series, double mass analysis was performed using single pixel and basin mean areal precipitation (MAP) values derived from gridded DMIP-2 and Parameter-Elevation Regressions on Independent Slopes Model (PRISM) precipitation data. The analysis leads to the conclusion that over the entire study time period, a clear change in error characteristics in the DMIP-2 data occurred in the beginning of 2003. This matches the timing of one of the major gage network changes. The inconsistency of two MAP time series computed from the gridded precipitation fields over two elevation zones was corrected by adjusting hourly values based on the double mass analysis. We show that model

  15. Multi-year record of atmospheric mercury at Dumont d'Urville, East Antarctic coast: continental outflow and oceanic influences

    Directory of Open Access Journals (Sweden)

    H. Angot

    2016-07-01

    Full Text Available Under the framework of the Global Mercury Observation System (GMOS project, a 3.5-year record of atmospheric gaseous elemental mercury (Hg(0 has been gathered at Dumont d'Urville (DDU, 66°40′ S, 140°01′ E, 43 m above sea level on the East Antarctic coast. Additionally, surface snow samples were collected in February 2009 during a traverse between Concordia Station located on the East Antarctic plateau and DDU. The record of atmospheric Hg(0 at DDU reveals particularities that are not seen at other coastal sites: a gradual decrease of concentrations over the course of winter, and a daily maximum concentration around midday in summer. Additionally, total mercury concentrations in surface snow samples were particularly elevated near DDU (up to 194.4 ng L−1 as compared to measurements at other coastal Antarctic sites. These differences can be explained by the more frequent arrival of inland air masses at DDU than at other coastal sites. This confirms the influence of processes observed on the Antarctic plateau on the cycle of atmospheric mercury at a continental scale, especially in areas subject to recurrent katabatic winds. DDU is also influenced by oceanic air masses and our data suggest that the ocean plays a dual role on Hg(0 concentrations. The open ocean may represent a source of atmospheric Hg(0 in summer whereas the sea-ice surface may provide reactive halogens in spring that can oxidize Hg(0. This paper also discusses implications for coastal Antarctic ecosystems and for the cycle of atmospheric mercury in high southern latitudes.

  16. Oak Forest Responses to Episodic-Seasonal-Drought, Chronic Multi-year Precipitation Change and Acute Drought Manipulations in a Region With Deep Soils and High Precipitation

    Science.gov (United States)

    Hanson, Paul J.; Wullschleger, Stan D.; Todd, Donald E.; Auge, Robert M.; Froberg, Mats; Johnson, Dale W.

    2010-05-01

    Implications of episodic-seasonal drought (extremely dry late summers), chronic multi-year precipitation manipulations (±33 percent over 12 years) and acute drought (-100 percent over 3 years) were evaluated for the response of vegetation and biogeochemical cycles for an upland-oak forest. The Quercus-Acer forest is located in eastern Tennessee on deep acidic soils with mean annual temperatures of 14.2 °C and abundant precipitation (1352 mm y-1). The multi-year observations and chronic manipulations were conducted from 1993 through 2005 using understory throughfall collection troughs and redistribution gutters and pipes. Acute manipulations of dominant canopy trees (Quercus prinus; Liriodendron tulipifera) were conducted from 2003 through 2005 using full understory tents. Regional and severe late-summer droughts were produced reduced stand water use and photosynthetic carbon gain as expected. Likewise, seedlings and saplings exhibited reduced survival and cumulative growth reductions. Conversely, multi-year chronic increases or decreases in precipitation and associated soil water deficits did not reduce large tree basal area growth for the tree species present. The resilience of canopy trees to chronic-change was the result of a disconnect between carbon allocation to tree growth (an early-season phenomenon) and late-season drought occurrence. Acute precipitation exclusion from the largest canopy trees also produced limited physiological responses and minimal cumulative growth reductions. Lateral root water sources were removed through trenching and could not explain the lack of response to extreme soil drying. Therefore, deep rooting the primary mechanism for large-tree resilience to severe drought. Extensive trench-based assessments of rooting depth suggested that ‘deep' water supplies were being obtained from limited numbers of deep fine roots. Observations of carbon stocks in organic horizons demonstrated accumulation with precipitation reductions and

  17. Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11

    International Nuclear Information System (INIS)

    Moore, D.A.

    1994-09-01

    The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan

  18. A multi-year longitudinal study of water quality parameters in four salmon-bearing and recreational streams on mount hood, Oregon.

    Directory of Open Access Journals (Sweden)

    Ronald Wasowski

    Full Text Available Four streams-Clear Fork, Lost Creek, Camp Creek and Still Creek-in northwestern Oregon's Sandy River Basin were monitored for temperature, dissolved oxygen levels, and fecal bacterial concentrations in a multi-year analysis examining stream health for recreational users and anchor habitat for Pacific Salmon. Temperatures were recorded using micro -T temperature loggers at 15 locations, during 22 July - 5 September 2006, 2 July - 4 September 2007, 20 June - 7 September 2008, 23 June - 9 September 2009, and 2 July -9 September 2010. The Seven-Day Average Maximum water temperature (7-DAM of 13°C was used as a reference value for the biological limit governing suitable salmonid spawning and egg incubation conditions. The maximum 7-DAM temperatures occurred on different dates and all streams neared or exceeded the 13°C standard at least once each summer. Dissolved oxygen levels were measured at weekly or longer intervals in 2006, 2007, 2008, and 2009. Dissolved oxygen levels fell below the 9.0 ppm standard for Clear Fork on almost half the sampling dates in 2006, 2007, and 2009. Concentrations of the bacterial genus Enterococcus were measured as an indicator of fecal contamination. Samples were collected at 15 sites along the four streams. Weekly samples were collected during a 9 week period from July - September 2007, an 11 week period from June - September 2008, and an 11 week period from June - September 2009. Enterococcus counts exceeded the federal recommended national criterion value of 61 colony forming units (CFU per 100 mL every year in Camp Creek and occasionally elsewhere, with exceedances trending towards late summer.

  19. How often are patients harmed when they visit the computed tomography suite? A multi-year experience, in incident reporting, in a large academic medical center

    International Nuclear Information System (INIS)

    Mansouri, Mohammad; Aran, Shima; Shaqdan, Khalid W.; Abujudeh, Hani H.

    2016-01-01

    Our goal is to present our multi-year experience in incident reporting in CT in a large medical centre. This is an IRB-approved, HIPAA-compliant study. Informed consent was waived for this study. The electronic safety incident reporting system of our hospital was searched for the variables from April 2006 to September 2012. Incident classifications were diagnostic test orders, ID/documentation, safety/security/conduct, service coordination, surgery/procedure, line/tube, fall, medication/IV safety, employee general incident, environment/equipment, adverse drug reaction, skin/tissue and diagnosis/treatment. A total of 1918 incident reports occurred in the study period and 843,902 CT examinations were performed. The rate of safety incident was 0.22 % (1918/843,902). The highest incident rates were due to adverse drug reactions (652/843,902 = 0.077 %) followed by medication/IV safety (573/843,902 = 0.068 %) and diagnostic test orders (206/843,902 = 0.024 %). Overall 45 % of incidents (869/1918) caused no harm and did not affect the patient, 33 % (637/1918) caused no harm but affected the patient, 22 % (420/1918) caused temporary or minor harm/damage and less than 1 % (10/1918) caused permanent or major harm/damage or death. Our study shows a total safety incident report rate of 0.22 % in CT. The most common incidents are adverse drug reaction, medication/IV safety and diagnostic test orders. (orig.)

  20. Efficient Maize and Sunflower Multi-year Mapping with NDVI Time Series of HJ-1A/1B in Hetao Irrigation District of Inner Mongolia, China

    Science.gov (United States)

    Yu, B.; Shang, S.

    2016-12-01

    Food shortage is one of the major challenges that human beings are facing. It is urgent to improve the monitoring of the plantation and distribution of the main crops to solve the following economic and social issues. Recently, with the extensive use of remote sensing satellite data, it has provided favorable conditions for crop identification in large irrigation district with complex planting structure. Difference of different crop phenology is the main basis for crop identification, and the normalized difference vegetation index (NDVI) time-series could better delineate crop phenology cycle. Therefore, the key of crop identification is to obtain high quality NDVI time-series. MODIS and Landsat TM satellite images are the most frequently used, however, neither of them could guarantee high temporal and spatial resolutions at once. Accordingly, this paper makes use of NDVI time-series extracted from China Environment Satellites data, which has two-day-repeat temporal and 30m spatial resolutions. The NDVI time-series are fitted with an asymmetric logistic curve, the fitting effect is good and the correlation coefficient is greater than 0.9. The phonological parameters are derived from NDVI fitting curves, and crop identification is carried out by different relation ellipses between NDVI and its phonological parameters of different crops. This paper takes Hetao Irrigation District of Inner Mongolia as an example, to identify multi-year maize and sunflower in the district, and the identification result is good. Compared with the official statistics, the relative errors are both lower than 5%. The results show that the NDVI time-series dataset derived from HJ-1A/1B CCD could delineate the crop phenology cycle accurately and demonstrate its application in crop identification in irrigated district.

  1. Advancing approaches for multi-year high-frequency monitoring of temporal and spatial variability in carbon cycle fluxes and drivers in freshwater lakes

    Science.gov (United States)

    Desai, A. R.; Reed, D. E.; Dugan, H. A.; Loken, L. C.; Schramm, P.; Golub, M.; Huerd, H.; Baldocchi, A. K.; Roberts, R.; Taebel, Z.; Hart, J.; Hanson, P. C.; Stanley, E. H.; Cartwright, E.

    2017-12-01

    Freshwater ecosystems are hotspots of regional to global carbon cycling. However, significant sample biases limit our ability to quantify and predict these fluxes. For lakes, scaled flux estimates suffer biased sampling toward 1) low-nutrient pristine lakes, 2) infrequent temporal sampling, 3) field campaigns limited to the growing season, and 4) replicates limited to near the center of the lake. While these biases partly reflect the realities of ecological sampling, there is a need to extend observations towards the large fraction of freshwater systems worldwide that are impaired by human activities and those facing significant interannual variability owing to climatic change. Also, for seasonally ice-covered lakes, much of the annual budget of carbon fluxes is thought to be explained by variation in the shoulder seasons of spring ice melt and fall turnover. Recent advances in automated, continuous multi-year temporal sampling coupled with rapid methods for spatial mapping of CO2 fluxes has strong potential to rectify these sampling biases. Here, we demonstrate these advances in an eutrophic seasonally-ice covered lake with an urban shoreline and agricultural watershed. Multiple years of half-hourly eddy covariance flux tower observations from two locations are coupled with frequent spatial samples of these fluxes and drivers by speedboat, floating chamber fluxes, automated buoy-based monitoring of lake nutrient and physical profiles, and ensemble of physical-ecosystem models. High primary productivity in the water column leads to an average net carbon sink during the growing season in much of the lake, but annual net carbon fluxes show the lake can act as an annual source or a sink of carbon depending the timing of spring and fall turnover. Trophic interactions and internal waves drive shorter-term variation while nutrients and biology drive seasonal variation. However, discrepancies remain among methods to quantify fluxes, requiring further investigation.

  2. The Next Generation of Risk Assessment Multi-Year Study—Highlights of Findings, Applications to Risk Assessment, and Future Directions

    Science.gov (United States)

    Cote, Ila; Andersen, Melvin E.; Ankley, Gerald T.; Barone, Stanley; Birnbaum, Linda S.; Boekelheide, Kim; Bois, Frederic Y.; Burgoon, Lyle D.; Chiu, Weihsueh A.; Crawford-Brown, Douglas; Crofton, Kevin M.; DeVito, Michael; Devlin, Robert B.; Edwards, Stephen W.; Guyton, Kathryn Z.; Hattis, Dale; Judson, Richard S.; Knight, Derek; Krewski, Daniel; Lambert, Jason; Maull, Elizabeth Anne; Mendrick, Donna; Paoli, Gregory M.; Patel, Chirag Jagdish; Perkins, Edward J.; Poje, Gerald; Portier, Christopher J.; Rusyn, Ivan; Schulte, Paul A.; Simeonov, Anton; Smith, Martyn T.; Thayer, Kristina A.; Thomas, Russell S.; Thomas, Reuben; Tice, Raymond R.; Vandenberg, John J.; Villeneuve, Daniel L.; Wesselkamper, Scott; Whelan, Maurice; Whittaker, Christine; White, Ronald; Xia, Menghang; Yauk, Carole; Zeise, Lauren; Zhao, Jay; DeWoskin, Robert S.

    2016-01-01

    Background: The Next Generation (NexGen) of Risk Assessment effort is a multi-year collaboration among several organizations evaluating new, potentially more efficient molecular, computational, and systems biology approaches to risk assessment. This article summarizes our findings, suggests applications to risk assessment, and identifies strategic research directions. Objective: Our specific objectives were to test whether advanced biological data and methods could better inform our understanding of public health risks posed by environmental exposures. Methods: New data and methods were applied and evaluated for use in hazard identification and dose–response assessment. Biomarkers of exposure and effect, and risk characterization were also examined. Consideration was given to various decision contexts with increasing regulatory and public health impacts. Data types included transcriptomics, genomics, and proteomics. Methods included molecular epidemiology and clinical studies, bioinformatic knowledge mining, pathway and network analyses, short-duration in vivo and in vitro bioassays, and quantitative structure activity relationship modeling. Discussion: NexGen has advanced our ability to apply new science by more rapidly identifying chemicals and exposures of potential concern, helping characterize mechanisms of action that influence conclusions about causality, exposure–response relationships, susceptibility and cumulative risk, and by elucidating new biomarkers of exposure and effects. Additionally, NexGen has fostered extensive discussion among risk scientists and managers and improved confidence in interpreting and applying new data streams. Conclusions: While considerable uncertainties remain, thoughtful application of new knowledge to risk assessment appears reasonable for augmenting major scope assessments, forming the basis for or augmenting limited scope assessments, and for prioritization and screening of very data limited chemicals. Citation: Cote I

  3. Hydrological performance of extensive green roofs in New York City: observations and multi-year modeling of three full-scale systems

    International Nuclear Information System (INIS)

    Carson, T B; Marasco, D E; Culligan, P J; McGillis, W R

    2013-01-01

    green roof. When applied to Central Park, NYC precipitation records from 1971 to 2010, the CRE models estimated total rainfall retention over the 40 year period to be 45%, 53%, and 58% for the W118, USPS, and ConEd green roofs respectively. Differences between the observed and modeled rainfall retention for W118 and USPS were primarily due to an abnormally high frequency of large events, 50 mm of rainfall or more, during the monitoring period compared to historic precipitation patterns. The multi-year retention rates are a more reliable estimate of annual rainfall capture and highlight the importance of long-term evaluations when reporting green roof performance. (letter)

  4. Hydrological performance of extensive green roofs in New York City: observations and multi-year modeling of three full-scale systems

    Science.gov (United States)

    Carson, T. B.; Marasco, D. E.; Culligan, P. J.; McGillis, W. R.

    2013-06-01

    green roof. When applied to Central Park, NYC precipitation records from 1971 to 2010, the CRE models estimated total rainfall retention over the 40 year period to be 45%, 53%, and 58% for the W118, USPS, and ConEd green roofs respectively. Differences between the observed and modeled rainfall retention for W118 and USPS were primarily due to an abnormally high frequency of large events, 50 mm of rainfall or more, during the monitoring period compared to historic precipitation patterns. The multi-year retention rates are a more reliable estimate of annual rainfall capture and highlight the importance of long-term evaluations when reporting green roof performance.

  5. Final Report - Navajo Electrification Demonstration Project - FY2004

    Energy Technology Data Exchange (ETDEWEB)

    Kenneth L. Craig, Interim General Manager

    2007-03-31

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year projects which addresses the needs of unserved Navajo Nation residents without basic electricity services. The Navajo Nation is the United States' largest tribe, in terms of population and land. An estimated 18,000 Navajo Nation homes do not have basic grid-tied electricity--and this third year of funding, known as NEDP-3, provided 351 power line extensions to Navajo families.

  6. 34 CFR 75.250 - Project period can be up to 60 months.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Project period can be up to 60 months. 75.250 Section... Are Made Approval of Multi-Year Projects § 75.250 Project period can be up to 60 months. The Secretary may approve a project period of up to 60 months. (Authority: 20 U.S.C. 1221e-3 and 3474) [45 FR 22497...

  7. Ground-air temperature tracking and multi-year cycles in the subsurface temperature time series at geothermal climat e-change observatory

    Czech Academy of Sciences Publication Activity Database

    Čermák, Vladimír; Bodri, L.; Šafanda, Jan; Krešl, Milan; Dědeček, Petr

    2014-01-01

    Roč. 58, č. 3 (2014), s. 406-424 ISSN 0039-3169 R&D Projects: GA ČR(CZ) GAP210/11/0183; GA AV ČR KSK3046108 Institutional support: RVO:67985530 Keywords : borehole observatory * temperature monitoring * climate change * subsurface temperature Subject RIV: DC - Siesmology, Volcanology, Earth Structure Impact factor: 0.806, year: 2014

  8. Review and Update Project Design, Work Plan and Activities for 2009 and Beyond

    International Nuclear Information System (INIS)

    Edward, M.

    2009-01-01

    A multi year ongoing project, previously approved by Board of Governors (BOG) that is implemented according to the already approved objectives/outcomes and time frame. All projects have time frame in line with the stated objectives and work plans, of maximum of five years. If rephasing is necessary due to dealys in implementation, the project duration can be extended by up to one year, maintaining the original objectives/outcomes

  9. Testing the Impact of a Multi-year, Curriculum-based Undergraduate Research Experience (MY-CURE) in the Geosciences: Baseline Observations

    Science.gov (United States)

    Allen, J. L.; Creamer, E. G.; Kuehn, S. C.

    2016-12-01

    Short-term undergraduate research experiences (URE's) provide skill and confidence enhancement to students, but it is unclear how effective they are in comparison to a dedicated, longer-term URE. This study examines the impact of a long-term URE embedded in a sequence of five courses in the geology curriculum. It begins with a sophomore course in environmental geology, and continues through mineralogy, structural geology, and petrology, before concluding at our summer geology field camp. In this sequence, they build upon individual URE's related to the structure and petrology of fault rocks from a mid-crustal shear zone. Rather than have students engage in one or more short-term URE's, they retain the same project for two calendar years so that we can assess when and how different gains, including a more sophisticated understanding of the nature of science, begin to emerge and mature. As each student progresses, we document the longitudinal development of a diverse suite of gains including: (1) Technical and higher-order research skills, (2) personal gains such as self-identity as a scientist, and (3) communication skills. In this presentation, we describe the framework of the study and baseline observations recorded during the first year of a 2-year cohort. Using a Q-sort method, students were given a deck of 16 index cards with an educational outcome listed on each. They sorted the cards into three piles: Those that encouraged an interest in geology, those that deterred an interest, and those with no impact. Participants discussed the top cards from the negative and positive piles. The top attractors to geology are collegial relationships with faculty, the opportunity to use scientific equipment, field work, the concreteness of geology, and the availability of jobs. Factors that deter interest include hours of tedious homework, math courses, and time invested in wrong answers or failed experiments/sample preparation. Factors not yet evident include confidence in

  10. Economic impact studies on development project of New Yogyakarta International Airport to aquaculture in Kulonprogo Coastal

    Science.gov (United States)

    Rachman, F.; Satriagasa, M. C.; Riasasi, W.

    2018-03-01

    New Yogyakarta International Airport (NYIA) is being constructed in Temon Sub District, Kulonprogo District. It lies on 587.2 ha area in the southern part of Java Island coastal area. Many areas of Kulonprogro coastal area are used for aquaculture of vanname shrimp. In that case, the aquaculture land needs to be cleared for the airport construction necessity and requires compensation. The value of the compensation needs to be right calculated by both sides, regarding the aquaculture land are local community assets. This study uses spatial analysis and visual interpretation. Whereas, the calculation of the acquisition value and income capital value uses Discounted Cash Flow (DCF) method. The result shows the area of aquaculture land which impacted to be cleared is 83 ha, means decreasing of shrimp ponds area in Temon Sub District, Kulonprogo District. The calculation of acquisition value for airport development indicates higher value than the income from the aquaculture activity. The results mean the aquaculture landlords do not incur losses due to the airport development project. These findings can be used for local government and related stakeholders to formulate a policy of aquaculture relocation and to estimate projection for aquaculture land suitability in Yogyakarta coastal area.

  11. Evaluation of Green Dot's Locke Transformation Project: Findings for Cohort 1 and 2 Students. CRESST Report 815

    Science.gov (United States)

    Herman, Joan L.; Wang, Jia; Rickles, Jordan; Hsu, Vivian; Monroe, Scott; Leon, Seth; Straubhaar, Rolf

    2012-01-01

    With funding from the Bill and Melinda Gates Foundation, CRESST conducted a multi-year evaluation of a major school reform project at Alain Leroy Locke High School, historically one of California's lowest performing secondary schools. Beginning in 2007, Locke High School transitioned into a set of smaller, Green Dot Charter High Schools,…

  12. Modelling income distribution impacts of water sector projects in Bangladesh.

    Science.gov (United States)

    Ahmed, C S; Jones, S

    1991-09-01

    Dynamic analysis was conducted to assess the long-term impacts of water sector projects on agricultural income distribution, and sensitivity analysis was conducted to check the robustness of the 5 assumptions in this study of income distribution and water sector projects in Bangladesh. 7 transitions are analyzed for mutually exclusive irrigation and flooding projects: Nonirrigation to 1) LLP irrigation, 2) STW irrigation, 3) DTW irrigation, 4) major gravity irrigation, and manually operated shallow tubewell irrigation (MOSTI) and Flood Control Projects (FCD) of 6) medium flooded to shallow flooded, and 7) deeply flooded to shallow flooded. 5 analytical stages are involved: 1) farm budgets are derived with and without project cropping patterns for each transition. 2) Estimates are generated for value added/hectare from each transition. 3) Assumptions are made about the number of social classes, distribution of land ownership between classes, extent of tenancy for each social class, term of tenancy contracts, and extent of hiring of labor for each social class. 4) Annual value added/hectare is distributed among social classes. 5) Using Gini coefficients and simple ratios, the distribution of income between classes is estimated for with and without transition. Assumption I is that there are 4 social classes defined by land acreage: large farmers (5 acres), medium farmers (1.5-5.0), small farmers, (.01-1.49), and landless. Assumption II is that land distribution follows the 1978 Land Occupancy Survey (LOS). Biases, if any, are indicated. Assumption III is that large farmers sharecrop out 15% of land to small farmers. Assumption IV is that landlords provide nonirrigated crop land and take 50% of the crop, and, under irrigation, provide 50% of the fertilizer, pesticide, and irrigation costs and take 50% of the crop. Assumption V is that hired and family labor is assumed to be 40% for small farmers, 60% for medium farmers, and 80% for large farmers. It is understood that

  13. Project Notes

    Science.gov (United States)

    School Science Review, 1978

    1978-01-01

    Presents sixteen project notes developed by pupils of Chipping Norton School and Bristol Grammar School, in the United Kingdom. These Projects include eight biology A-level projects and eight Chemistry A-level projects. (HM)

  14. Multi-year objective analyses of warm season ground-level ozone and PM2.5 over North America using real-time observations and Canadian operational air quality models

    Science.gov (United States)

    Robichaud, A.; Ménard, R.

    2014-02-01

    Multi-year objective analyses (OA) on a high spatiotemporal resolution for the warm season period (1 May to 31 October) for ground-level ozone and for fine particulate matter (diameter less than 2.5 microns (PM2.5)) are presented. The OA used in this study combines model outputs from the Canadian air quality forecast suite with US and Canadian observations from various air quality surface monitoring networks. The analyses are based on an optimal interpolation (OI) with capabilities for adaptive error statistics for ozone and PM2.5 and an explicit bias correction scheme for the PM2.5 analyses. The estimation of error statistics has been computed using a modified version of the Hollingsworth-Lönnberg (H-L) method. The error statistics are "tuned" using a χ2 (chi-square) diagnostic, a semi-empirical procedure that provides significantly better verification than without tuning. Successful cross-validation experiments were performed with an OA setup using 90% of data observations to build the objective analyses and with the remainder left out as an independent set of data for verification purposes. Furthermore, comparisons with other external sources of information (global models and PM2.5 satellite surface-derived or ground-based measurements) show reasonable agreement. The multi-year analyses obtained provide relatively high precision with an absolute yearly averaged systematic error of less than 0.6 ppbv (parts per billion by volume) and 0.7 μg m-3 (micrograms per cubic meter) for ozone and PM2.5, respectively, and a random error generally less than 9 ppbv for ozone and under 12 μg m-3 for PM2.5. This paper focuses on two applications: (1) presenting long-term averages of OA and analysis increments as a form of summer climatology; and (2) analyzing long-term (decadal) trends and inter-annual fluctuations using OA outputs. The results show that high percentiles of ozone and PM2.5 were both following a general decreasing trend in North America, with the eastern

  15. Navajo-Hopi Land Commission Renewable Energy Development Project (NREP)

    Energy Technology Data Exchange (ETDEWEB)

    Thomas Benally, Deputy Director,

    2012-05-15

    The Navajo Hopi Land Commission Office (NHLCO), a Navajo Nation executive branch agency has conducted activities to determine capacity-building, institution-building, outreach and management activities to initiate the development of large-scale renewable energy - 100 megawatt (MW) or larger - generating projects on land in Northwestern New Mexico in the first year of a multi-year program. The Navajo Hopi Land Commission Renewable Energy Development Project (NREP) is a one year program that will develop and market a strategic business plan; form multi-agency and public-private project partnerships; compile site-specific solar, wind and infrastructure data; and develop and use project communication and marketing tools to support outreach efforts targeting the public, vendors, investors and government audiences.

  16. Define Project

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas

    2005-01-01

    "Project" is a key concept in IS management. The word is frequently used in textbooks and standards. Yet we seldom find a precise definition of the concept. This paper discusses how to define the concept of a project. The proposed definition covers both heavily formalized projects and informally...... organized, agile projects. Based on the proposed definition popular existing definitions are discussed....

  17. Project Management

    DEFF Research Database (Denmark)

    Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015.......Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015....

  18. Project Management

    DEFF Research Database (Denmark)

    Pilkington, Alan; Chai, Kah-Hin; Le, Yang

    2015-01-01

    This paper identifies the true coverage of PM theory through a bibliometric analysis of the International Journal of Project Management from 1996-2012. We identify six persistent research themes: project time management, project risk management, programme management, large-scale project management......, project success/failure and practitioner development. These differ from those presented in review and editorial articles in the literature. In addition, topics missing from the PM BOK: knowledge management project-based organization and project portfolio management have become more popular topics...

  19. Project financing

    International Nuclear Information System (INIS)

    Cowan, A.

    1998-01-01

    Project financing was defined ('where a lender to a specific project has recourse only to the cash flow and assets of that project for repayment and security respectively') and its attributes were described. Project financing was said to be particularly well suited to power, pipeline, mining, telecommunications, petro-chemicals, road construction, and oil and gas projects, i.e. large infrastructure projects that are difficult to fund on-balance sheet, where the risk profile of a project does not fit the corporation's risk appetite, or where higher leverage is required. Sources of project financing were identified. The need to analyze and mitigate risks, and being aware that lenders always take a conservative view and gravitate towards the lowest common denominator, were considered the key to success in obtaining project financing funds. TransAlta Corporation's project financing experiences were used to illustrate the potential of this source of financing

  20. Project descriptions

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    This part specifies the activities and project tasks of each project broken down according to types of financing, listing the current projects Lw 1 through 3 funded by long-term provisions (budget), the current projects LB 1 and 2, LG 1 through 5, LK1, LM1, and LU 1 through 6 financed from special funds, and the planned projects ZG 1 through 4 and ZU 1, also financed from special funds. (DG) [de

  1. Development and evaluation of a novel fast broad-range 16S ribosomal DNA PCR and sequencing assay for diagnosis of bacterial infective endocarditis: multi-year experience in a large Canadian healthcare zone and a literature review.

    Science.gov (United States)

    Miller, Robert J H; Chow, Barbara; Pillai, Dylan; Church, Deirdre

    2016-04-12

    The study aimed to explore the sensitivity and specificity of a novel fast 16S rDNA PCR and sequencing assay for the improved diagnosis of infective endocarditis (IE) in patients with suspected native or prosthetic heart valve (HV) infection over a multi-year period at our cardiovascular center. Sixty-eight patients were prospectively enrolled who underwent HV replacement for suspected or confirmed IE between February 1, 2009 and September 1, 2014. Patient demographics, medical co-morbidities, Duke's criteria, culture results, and antibiotic therapy were collected by detailed chart reviews. Dual-priming oligonucleotide primers targeted to 500 bps of the V1-V3 region of the 16S rRNA gene were used to perform fast broad-range 16S rDNA PCR and Sanger sequencing on ribosomal DNA extracted from HV tissues. The performance/diagnostic efficiency of the molecular test was evaluated against blood cultures and Gram stain and culture of HV tissue in patients' with definite IE according to Duke's criteria. Fifty patients (73.5%) had definite IE and another 8 (11.8%) had possible IE according to Duke's criteria. Cardiac surgery was delayed an average of 15.4 days from the time of the patient's last positive blood culture, and appropriate antibiotic therapy was given in the pre-operative period. While 44/50 (88%) patients had a positive blood culture, HV tissue culture was only positive in 23 (46%) of them. Molecular testing of all HV tissues had sensitivity, specificity, NPV and PPV of 92, 77.8, 77.8 and 92% compared to 44, 100, 39.1 and 100% respectively for culture for diagnosis of definite IE. For prosthetic HV tissue, 16S rDNA PCR had sensitivity of 93% and specificity of 83% compared to 35 and 100% respectively for culture. A literature review showed that the diagnostic accuracy of our novel fast broad-range 16S rDNA PCR assay was similar or better than that of previously published studies. This novel fast broad-range 16S rDNA PCR/sequencing test had superior sensitivity

  2. Project studies

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2018-01-01

    Project organising is a growing field of scholarly inquiry and management practice. In recent years, two important developments have influenced this field: (1) the study and practice of projects have extended their level of analysis from mainly focussing on individual projects to focussing on micro......, and of the explanations of project practices they could offer. To discuss avenues for future research on projects and project practice, this paper suggests the notion of project studies to better grasp the status of our field. We combine these two sets of ideas to analyse the status and future options for advancing...... project research: (1) levels of analysis; and (2) type of research. Analysing recent developments within project studies, we observe the emergence of what we refer to as type 3 research, which reconciles the need for theoretical development and engagement with practice. Type 3 research suggests pragmatic...

  3. Virtual projects

    DEFF Research Database (Denmark)

    Svejvig, Per; Commisso, Trine Hald

    2012-01-01

    that the best practice knowledge has not permeated sufficiently to the practice. Furthermore, the appropriate application of information and communication technology (ICT) remains a big challenge, and finally project managers are not sufficiently trained in organizing and conducting virtual projects....... The overall implications for research and practice are to acknowledge virtual project management as very different to traditional project management and to address this difference.......Virtual projects are common with global competition, market development, and not least the financial crisis forcing organizations to reduce their costs drastically. Organizations therefore have to place high importance on ways to carry out virtual projects and consider appropriate practices...

  4. Project financing

    International Nuclear Information System (INIS)

    Alvarez, M.U.

    1990-01-01

    This paper presents the basic concepts and components of the project financing of large industrial facilities. Diagrams of a simple partnership structure and a simple leveraged lease structure are included. Finally, a Hypothetical Project is described with basic issues identified for discussion purposes. The topics of the paper include non-recourse financing, principal advantages and objectives, disadvantages, project financing participants and agreements, feasibility studies, organization of the project company, principal agreements in a project financing, insurance, and an examination of a hypothetical project

  5. Microsoft project

    OpenAIRE

    Markić, Lucija; Mandušić, Dubravka; Grbavac, Vitomir

    2005-01-01

    Microsoft Project je alat čije su prednosti u svakodnevnom radu nezamjenjive. Pomoću Microsoft Projecta omogućeno je upravljanje resursima, stvaranje izvještaja o projektima u vremenu, te analize različitih scenarija. Pojavljuje u tri verzije: Microsoft Project Professional, Microsoft Project Server i Microsoft Project Server Client Access Licenses. Upravo je trend da suvremeni poslovni ljudi zadatke povjeravaju Microsoft Projectu jer on znatno povećava produktivnost rada. Te prednos...

  6. Project ethics

    CERN Document Server

    Jonasson, Haukur Ingi

    2013-01-01

    How relevant is ethics to project management? The book - which aims to demystify the field of ethics for project managers and managers in general - takes both a critical and a practical look at project management in terms of success criteria, and ethical opportunities and risks. The goal is to help the reader to use ethical theory to further identify opportunities and risks within their projects and thereby to advance more directly along the path of mature and sustainable managerial practice.

  7. Radon investigations - Soil and commercial projects

    International Nuclear Information System (INIS)

    Goodwin, R.W.

    1987-01-01

    The liability issues of radon exposure have prompted potential purchasers of vacant land for commercial/industrial development, and commercial landlords, renting large commercial buildings, to determine the radon gas levels at such sites. This paper deals with both pre-construction sites subject to freezing conditions and to large commercial structures. A correlation of radon gas levels within a commercial building and a sister pre-construction site confirms the validity of using activated charcoal canisters as a cost effective means to combating radon in large structures

  8. Project Temporalities

    DEFF Research Database (Denmark)

    Tryggestad, Kjell; Justesen, Lise; Mouritsen, Jan

    2013-01-01

    Purpose – The purpose of this paper is to explore how animals can become stakeholders in interaction with project management technologies and what happens with project temporalities when new and surprising stakeholders become part of a project and a recognized matter of concern to be taken...... into account. Design/methodology/approach – The paper is based on a qualitative case study of a project in the building industry. The authors use actor-network theory (ANT) to analyze the emergence of animal stakeholders, stakes and temporalities. Findings – The study shows how project temporalities can...... multiply in interaction with project management technologies and how conventional linear conceptions of project time may be contested with the emergence of new non-human stakeholders and temporalities. Research limitations/implications – The study draws on ANT to show how animals can become stakeholders...

  9. LEX Project

    DEFF Research Database (Denmark)

    Damkilde, Lars; Larsen, Torben J.; Walbjørn, Jacob

    This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept.......This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept....

  10. OMEGA project

    International Nuclear Information System (INIS)

    Shibuya, E.H.

    1989-01-01

    The OMEGA - Observation of Multiple particle production, Exotic Interactions and Gamma-ray Air Shower-project is presented. The project try to associate photosensitive detectors from experiences of hadronic interactions with electronic detectors used by experiences that investigate extensive atmospheric showers. (M.C.K.)

  11. Citizen Sky, An Update on the AAVSO's New Citizen Science Project

    Science.gov (United States)

    Turner, Rebecca; Price, A.; Henden, A.; Stencel, R.; Kloppenborg, B.

    2011-01-01

    Citizen Sky is a multi-year, NSF-funded, citizen science project focusing on the bright variable star, epsilon Aurigae. Citizen Sky goes beyond simple observing to include a major data analysis component. The goal is to introduce the participant to the full scientific process from background research to paper writing for a peer-reviewed journal. The first year of the project, 2009-10, was dedicated to developing project infrastructure, educating participants about epsilon Aurigae, and training these participants to observe the star and report their data. Looking forward, years two and three of the project will focus on assembling teams of participants to work on their own analysis and research. Results will be published in a special issue of the peer-reviewed Journal of the AAVSO. This project has been made possible by the National Science Foundation.

  12. Watchdog Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories, Inc., Pullman, WA (United States); Campbell, Jack [CenterPoint Energy Houston Electric, TX (United States); Hadley, Mark [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-12-30

    The Watchdog Project completed 100% of the project Statement of Project Objective (SOPO). The Watchdog project was a very aggressive project looking to accomplish commercialization of technology that had never been commercialized, as a result it took six years to complete not the original three that were planned. No additional federal funds were requested from the original proposal and SEL contributed the additional cost share required to complete the project. The result of the Watchdog Project is the world’s first industrial rated Software Defined Network (SDN) switch commercially available. This technology achieved the SOPOO and DOE Roadmap goals to have strong network access control, improve reliability and network performance, and give the asset owner the ability to minimize attack surface before and during an attack. The Watchdog project is an alliance between CenterPoint Energy Houston Electric, Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. PNNL performs basic and applied research to deliver energy, environmental, and national security for our nation. CenterPoint Energy is the third largest publicly traded natural gas delivery company in the U.S and third largest combined electricity and natural gas delivery company. The Watchdog Project efforts were combined with the SDN Project efforts to produce the entire SDN system solution for the critical infrastructure. The Watchdog project addresses Topic Area of Interest 5: Secure Communications, for the DEFOA- 0000359 by protecting the control system local area network itself and the communications coming from and going to the electronic devices on the local network. Local area networks usually are not routed and have little or no filtering capabilities. Combine this with the fact control system protocols are designed with inherent trust the control

  13. Freedom Project

    Directory of Open Access Journals (Sweden)

    Alejandra Suarez

    2014-02-01

    Full Text Available Freedom Project trains prisoners in nonviolent communication and meditation. Two complementary studies of its effects are reported in this article. The first study is correlational; we found decreased recidivism rates among prisoners trained by Freedom Project compared with recidivism rates in Washington state. The second study compared trained prisoners with a matched-pair control group and found improvement in self-reported anger, self-compassion, and certain forms of mindfulness among the trained group. Ratings of role-plays simulating difficult interactions show increased social skills among the group trained by Freedom Project than in the matched controls.

  14. EBFA project

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    An engineering project office was established during the fall of 1976 to manage and coordinate all of the activities of the Electron Beam Fusion Project. The goal of the project is to develop the Electron Beam Fusion Accelerator (EBFA) and its supporting systems, and integrate these systems into the new Electron Beam Fusion Facility (EBFF). Supporting systems for EBFA include a control/monitor system, a data acquistion/automatic data processing system, the liquid transfer systems, the insulating gas transfer systems, etc. Engineers and technicians were assigned to the project office to carry out the engineering design, initiate procurement, monitor the fabrication, perform the assembly and to assist the pulsed power research group in the activation of the EBFA

  15. Project Reptile!

    Science.gov (United States)

    Diffily, Deborah

    2001-01-01

    Integrating curriculum is important in helping children make connections within and among areas. Presents a class project for kindergarten children which came out of the students' interests and desire to build a reptile exhibit. (ASK)

  16. Project Soar.

    Science.gov (United States)

    Austin, Marion

    1982-01-01

    Project Soar, a Saturday enrichment program for gifted students (6-14 years old), allows students to work intensively in a single area of interest. Examples are cited of students' work in crewel embroidery, creative writing, and biochemistry. (CL)

  17. EUROFANCOLEN Project

    International Nuclear Information System (INIS)

    Bueren, J. A.

    2014-01-01

    The first follow-up report of European Project EUROFANCOLEN, the purpose of which is to develop a gene therapy clinical trial to resolve bone marrow failure in patients with a genetic disease known as Fanconi anemia (FA), was sent to the European Commission in September. The main objective of project EUROFANCOLEN is to develop a gene therapy trial for patients with Fanconi anemia Type A (FA-A), which affects 80% of the patients with FA in Spain. (Author)

  18. Project Management

    DEFF Research Database (Denmark)

    Kampf, Constance

    2009-01-01

    In this video Associate Professor Constance Kampf talks about the importance project management. Not only as a tool in implementation, but also as a way of thinking, and as something that needs to be considered from idea conception......In this video Associate Professor Constance Kampf talks about the importance project management. Not only as a tool in implementation, but also as a way of thinking, and as something that needs to be considered from idea conception...

  19. The Los Alamos National Laboratory Chemistry and Metallurgy Research Facility upgrades project - A model for waste minimization

    International Nuclear Information System (INIS)

    Burns, M.L.; Durrer, R.E.; Kennicott, M.A.

    1996-07-01

    The Los Alamos National Laboratory (LANL) Chemistry and Metallurgy Research (CMR) Facility, constructed in 1952, is currently undergoing a major, multi-year construction project. Many of the operations required under this project (i.e., design, demolition, decontamination, construction, and waste management) mimic the processes required of a large scale decontamination and decommissioning (D ampersand D) job and are identical to the requirements of any of several upgrades projects anticipated for LANL and other Department of Energy (DOE) sites. For these reasons the CMR Upgrades Project is seen as an ideal model facility - to test the application, and measure the success of - waste minimization techniques which could be brought to bear on any of the similar projects. The purpose of this paper will be to discuss the past, present, and anticipated waste minimization applications at the facility and will focus on the development and execution of the project's open-quotes Waste Minimization/Pollution Prevention Strategic Plan.close quotes

  20. Project mobilisation

    International Nuclear Information System (INIS)

    Clark, J.; Limbrick, A.

    1996-01-01

    This paper identifies and reviews the issues to be addressed and the procedures to be followed during the mobilisation of projects using LFG as an energy source. Knowledge of the procedures involved in project mobilisation, their sequence and probable timescales, is essential for efficient project management. It is assumed that the majority of projects will be situated on existing, licensed landfill sites and, in addition to complying with the relevant conditions of the waste management licence and original planning consent, any proposed developments on the site will require a separate planning consent. Experience in the UK indicates that obtaining planning permission rarely constitutes a barrier to the development of schemes for the utilisation of LFG. Even so, an appreciation of the applicable environmental and planning legislation is essential as this will enable the developer to recognise the main concerns of the relevant planning authority at an early stage of the project, resulting in the preparation of an informed and well-structured application for planning permission. For a LFG utilisation scheme on an existing landfill site, the need to carry out an environmental assessment (EA) as part of the application for planning permission will, in vitually all cases, be discretionary. Even if not deemed necessary by the planning authority, an EA is a useful tool at the planning application stage, to identify and address potential problems and to support discussions with bodies such as the Environment Agency, from whom consents or authorisations may be required. Carrying out an EA can thus provide for more cost-effective project development and enhanced environmental protection. Typically, the principal contractual arrangements, such as the purchase of gas or the sale of electricity, will have been established before the project mobilisation phase. However, there are many other contractural arrangements that must be established, and consents and permits that may be

  1. NGA-West2 Research Project

    Science.gov (United States)

    Bozorgnia, Yousef; Abrahamson, Norman A.; Al Atik, Linda; Ancheta, Timothy D.; Atkinson, Gail M.; Baker, Jack W.; Baltay, Annemarie S.; Boore, David M.; Campbell, Kenneth W.; Chiou, Brian S.J.; Darragh, Robert B.; Day, Steve; Donahue, Jennifer; Graves, Robert W.; Gregor, Nick; Hanks, Thomas C.; Idriss, I. M.; Kamai, Ronnie; Kishida, Tadahiro; Kottke, Albert; Mahin, Stephen A.; Rezaeian, Sanaz; Rowshandel, Badie; Seyhan, Emel; Shahi, Shrey; Shantz, Tom; Silva, Walter; Spudich, Paul A.; Stewart, Jonathan P.; Watson-Lamprey, Jennie; Wooddell, Kathryn; Youngs, Robert

    2014-01-01

    The NGA-West2 project is a large multidisciplinary, multi-year research program on the Next Generation Attenuation (NGA) models for shallow crustal earthquakes in active tectonic regions. The research project has been coordinated by the Pacific Earthquake Engineering Research Center (PEER), with extensive technical interactions among many individuals and organizations. NGA-West2 addresses several key issues in ground-motion seismic hazard, including updating the NGA database for a magnitude range of 3.0–7.9; updating NGA ground-motion prediction equations (GMPEs) for the “average” horizontal component; scaling response spectra for damping values other than 5%; quantifying the effects of directivity and directionality for horizontal ground motion; resolving discrepancies between the NGA and the National Earthquake Hazards Reduction Program (NEHRP) site amplification factors; analysis of epistemic uncertainty for NGA GMPEs; and developing GMPEs for vertical ground motion. This paper presents an overview of the NGA-West2 research program and its subprojects.

  2. Advertising Citizen Science: A Trailer for the Citizen Sky Project

    Science.gov (United States)

    Wyatt, Ryan; Price, A.

    2012-01-01

    Citizen Sky is a multi-year, NSF funded citizen science project involving the bright and mysterious variable star epsilon Aurigae. The project was conceived by the IYA 2009 working group on Research Experiences for Students, Teachers, and Citizen-Scientists. Citizen Sky goes beyond simple observing to include a major data analysis component, introducing participants to the full scientific process from background research to paper writing for a peer-reviewed journal. As a means of generating interest in the project, the California Academy of Sciences produced a six-minute "trailer” formatted for both traditional and fulldome planetariums as well as HD and web applications. This talk will review the production process for the trailer as well as the methods of distribution via planetariums, social media, and other venues_along with an update on the Citizen Sky Project as a whole. We will show how to use a small, professionally-produced planetarium trailer to help spread word on a citizen science project. We will also show preliminary results on a study about how participation level/type in the project affects science learning.

  3. Projective mapping

    DEFF Research Database (Denmark)

    Dehlholm, Christian; Brockhoff, Per B.; Bredie, Wender Laurentius Petrus

    2012-01-01

    by the practical testing environment. As a result of the changes, a reasonable assumption would be to question the consequences caused by the variations in method procedures. Here, the aim is to highlight the proven or hypothetic consequences of variations of Projective Mapping. Presented variations will include...... instructions and influence heavily the product placements and the descriptive vocabulary (Dehlholm et.al., 2012b). The type of assessors performing the method influences results with an extra aspect in Projective Mapping compared to more analytical tests, as the given spontaneous perceptions are much dependent......Projective Mapping (Risvik et.al., 1994) and its Napping (Pagès, 2003) variations have become increasingly popular in the sensory field for rapid collection of spontaneous product perceptions. It has been applied in variations which sometimes are caused by the purpose of the analysis and sometimes...

  4. Isotopes Project

    International Nuclear Information System (INIS)

    Dairiki, J.M.; Browne, E.; Firestone, R.B.; Lederer, C.M.; Shirley, V.S.

    1984-01-01

    The Isotopes Project compiles and evaluates nuclear structure and decay data and disseminates these data to the scientific community. From 1940-1978 the Project had as its main objective the production of the Table of Isotopes. Since publication of the seventh (and last) edition in 1978, the group now coordinates its nuclear data evaluation efforts with those of other data centers via national and international nuclear data networks. The group is currently responsible for the evaluation of mass chains A = 167-194. All evaluated data are entered into the International Evaluated Nuclear Structure Data File (ENSDF) and are published in Nuclear Data Sheets. In addition to the evaluation effort, the Isotopes Project is responsible for production of the Radioactivity Handbook

  5. Post Irradiation Examination Plan for High-Burnup Demonstration Project Sister Rods

    Energy Technology Data Exchange (ETDEWEB)

    Scaglione, John M [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Montgomery, Rose [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bevard, Bruce Balkcom [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-04-01

    This test plan describes the experimental work to be implemented by the U.S. Department of Energy (DOE) Office of Nuclear Energy (NE) to characterize high burnup (HBU) spent nuclear fuel (SNF) in conjunction with the High Burnup Dry Storage Cask Research and Development Project and serves to coordinate and integrate the multi-year experimental program to collect and develop data regarding the continued storage and eventual transport of HBU (i.e., >45 GWd/MTU) SNF. The work scope involves the development, performance, technical integration, and oversight of measurements and collection of relevant data, guided by analyses and demonstration of need.

  6. LLAMA Project

    Science.gov (United States)

    Arnal, E. M.; Abraham, Z.; Giménez de Castro, G.; de Gouveia dal Pino, E. M.; Larrarte, J. J.; Lepine, J.; Morras, R.; Viramonte, J.

    2014-10-01

    The project LLAMA, acronym of Long Latin American Millimetre Array is very briefly described in this paper. This project is a joint scientific and technological undertaking of Argentina and Brazil on the basis of an equal investment share, whose mail goal is both to install and to operate an observing facility capable of exploring the Universe at millimetre and sub/millimetre wavelengths. This facility will be erected in the argentinean province of Salta, in a site located at 4830m above sea level.

  7. Project Avatar

    DEFF Research Database (Denmark)

    Juhlin, Jonas Alastair

    'Project Avatar' tager udgangspunkt i den efterretningsdisciplin, der kaldes Open Source Intelligence og indebærer al den information, som ligger frit tilgængeligt i åbne kilder. Med udbredelsen af sociale medier åbners der op for helt nye typer af informationskilder. Spørgsmålet er; hvor nyttig er...

  8. Project Baltia

    Index Scriptorium Estoniae

    2007-01-01

    Uus arhitektuuriajakiri "Project Baltia" tutvustab Baltimaade, Soome ja Peterburi regiooni arhitektuuri, linnaehitust ja disaini. Ilmub neli korda aastas inglise- ja venekeelsena. Väljaandja: kirjastus Balticum Peterburis koostöös Amsterdami ja Moskva kirjastusega A-Fond. Peatoimetaja Vladimir Frolov

  9. Tedese Project

    Science.gov (United States)

    Buforn, E.; Davila, J. Martin; Bock, G.; Pazos, A.; Udias, A.; Hanka, W.

    The TEDESE (Terremotos y Deformacion Cortical en el Sur de España) project is a joint project of the Universidad Complutense de Madrid (UCM) and Real Instituto y Observatorio de la Armada de San Fernando, Cadiz (ROA) supported by the Spanish Ministerio de Ciencia y Tecnologia with the participation of the GeoforschungZen- trum, Potsdam (GFZ). The aim is to carry out a study of the characteristics of the oc- currence and mechanism of earthquakes together with measurements of crustal struc- ture and deformations in order to obtain an integrated evaluation of seismic risk in southern Spain from. As part of this project a temporal network of 10 broad-band seismological stations, which will complete those already existing in the zone, have been installed in southern Spain and northern Africa for one year beginning in October 2001. The objectives of the project are the study in detail of the focal mechanisms of earthquakes in this area, of structural in crust and upper mantle, of seismic anisotropy in crust and mantle as indicator for tectonic deformation processed and the measure- ments of crustal deformations using techniques with permanent GPS and SLR stations and temporary GPS surveys. From these studies, seismotectonic models and maps will be elaborated and seismic risk in the zone will be evaluated.

  10. Project Boomerang

    Science.gov (United States)

    King, Allen L.

    1975-01-01

    Describes an experimental project on boomerangs designed for an undergraduate course in classical mechanics. The students designed and made their own boomerangs, devised their own procedures, and carried out suitable measurements. Presents some of their data and a simple analysis for the two-bladed boomerang. (Author/MLH)

  11. Project Narrative

    Energy Technology Data Exchange (ETDEWEB)

    Driscoll, Mary C. [St. Bonaventure University, St Bonaventure, NY(United States)

    2012-07-12

    The Project Narrative describes how the funds from the DOE grant were used to purchase equipment for the biology, chemistry, physics and mathematics departments. The Narrative also describes how the equipment is being used. There is also a list of the positive outcomes as a result of having the equipment that was purchased with the DOE grant.

  12. Radiochemistry Project

    International Nuclear Information System (INIS)

    Anon.

    Researches carried out in the 'Radiochemistry Project' of the Agricultural Nuclear Energy Center, Piracicaba, Sao Paulo State, Brazil, are described. Such researches comprise: dosimetry and radiological protection; development of techniques and methods of chemical analysis and radiochemistry. (M.A.) [pt

  13. FLOAT Project

    DEFF Research Database (Denmark)

    Sørensen, Eigil V.; Aarup, Bendt

    The objective of the FLOAT project is to study the reliability of high-performance fibre-reinforced concrete, also known as Compact Reinforced Composite (CRC), for the floats of wave energy converters. In order to reach a commercial breakthrough, wave energy converters need to achieve a lower price...

  14. Hydrology Project

    International Nuclear Information System (INIS)

    Anon.

    Research carried out in the 'Hydrology Project' of the Centro de Energia Nuclear na Agricultura', Piracicaba, Sao Paulo State, Brazil, are described. Such research comprises: Amazon hydrology and Northeast hydrology. Techniques for the measurement of isotope ratios are used. (M.A.) [pt

  15. CHEMVAL project

    International Nuclear Information System (INIS)

    Chandratillake, M.; Falck, W.E.; Read, D.

    1992-01-01

    This report summarises the development history of the CHEMVAL Thermodynamic Database, the criteria employed for data selection and the contents of Version 4.0, issued to participants on the completion of the project. It accompanies a listing of the database constructed using the dBase III + /IV database management package. (Author)

  16. Project COLD.

    Science.gov (United States)

    Kazanjian, Wendy C.

    1982-01-01

    Describes Project COLD (Climate, Ocean, Land, Discovery) a scientific study of the Polar Regions, a collection of 35 modules used within the framework of existing subjects: oceanography, biology, geology, meterology, geography, social science. Includes a partial list of topics and one activity (geodesic dome) from a module. (Author/SK)

  17. Swedish projects

    International Nuclear Information System (INIS)

    Thunell, J.

    1993-01-01

    The main sources of the financing of Swedish research on gas technology are listed in addition to names of organizations which carry out this research. The titles and descriptions of the projects carried out are presented in addition to lists of reports published with information on prices. (AB)

  18. SDN Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories Inc, Pullman, WA (United States)

    2016-12-23

    The SDN Project completed on time and on budget and successfully accomplished 100% of the scope of work outlined in the original Statement of Project Objective (SOPO). The SDN Project formed an alliance between Ameren Corporation, University of Illinois Urbana- Champaign (UIUC), Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). The objective of the SDN Project is to address Topic Area of Interest 2: Sustain critical energy delivery functions while responding to a cyber-intrusion under Funding Opportunity Announcement DE-FOA-0000797. The goal of the project is to design and commercially release technology that provides a method to sustain critical energy delivery functions during a cyber intrusion and to do this control system operators need the ability to quickly identify and isolate the affected network areas, and re-route critical information and control flows around. The objective of the SDN Project is to develop a Flow Controller that monitors, configures, and maintains the safe, reliable network traffic flows of all the local area networks (LANs) on a control system in the Energy sector. The SDN team identified the core attributes of a control system and produced an SDN flow controller that has the same core attributes enabling networks to be designed, configured and deployed that maximize the whitelisted, deny-bydefault and purpose built networks. This project researched, developed and commercially released technology that: Enables all field networks be to configured and monitored as if they are a single asset to be protected; Enables greatly improved and even precalculated response actions to reliability and cyber events; Supports pre-configured localized response actions tailored to provide resilience against failures and centralized response to cyber-attacks that improve network reliability and availability; Architecturally enables the right subject matter experts, who are usually the information

  19. Projective geometry and projective metrics

    CERN Document Server

    Busemann, Herbert

    2005-01-01

    The basic results and methods of projective and non-Euclidean geometry are indispensable for the geometer, and this book--different in content, methods, and point of view from traditional texts--attempts to emphasize that fact. Results of special theorems are discussed in detail only when they are needed to develop a feeling for the subject or when they illustrate a general method. On the other hand, an unusual amount of space is devoted to the discussion of the fundamental concepts of distance, motion, area, and perpendicularity.Topics include the projective plane, polarities and conic sectio

  20. Projective measure without projective Baire

    DEFF Research Database (Denmark)

    Schrittesser, David; Friedman, Sy David

    We prove that it is consistent (relative to a Mahlo cardinal) that all projective sets of reals are Lebesgue measurable, but there is a ∆13 set without the Baire property. The complexity of the set which provides a counterexample to the Baire property is optimal.......We prove that it is consistent (relative to a Mahlo cardinal) that all projective sets of reals are Lebesgue measurable, but there is a ∆13 set without the Baire property. The complexity of the set which provides a counterexample to the Baire property is optimal....

  1. 75 FR 25284 - Tracking the Use of CDBG Homeowners and Small Landlords Disaster Assistance Grants

    Science.gov (United States)

    2010-05-07

    ... affected by hurricanes Katrina and Rita (Louisiana, Mississippi, and Texas) and identify the most important... affected by hurricanes Katrina and Rita (Louisiana, Mississippi, and Texas) and identify the most important... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5376-N-32] Tracking the Use of CDBG...

  2. The herbaceous landlord: integrating the effects of symbiont consortia within a single host

    Directory of Open Access Journals (Sweden)

    Roo Vandegrift

    2015-11-01

    Full Text Available Plants are typically infected by a consortium of internal fungal associates, including endophytes in their leaves, as well as arbuscular mycorrhizal fungi (AMF and dark septate endophytes (DSE in their roots. It is logical that these organisms will interact with each other and the abiotic environment in addition to their host, but there has been little work to date examining the interactions of multiple symbionts within single plant hosts, or how the relationships among symbionts and their host change across environmental conditions. We examined the grass Agrostis capillaris in the context of a climate manipulation experiment in prairies in the Pacific Northwest, USA. Each plant was tested for presence of foliar endophytes in the genus Epichloë, and we measured percent root length colonized (PRLC by AMF and DSE. We hypothesized that the symbionts in our system would be in competition for host resources, that the outcome of that competition could be driven by the benefit to the host, and that the host plants would be able to allocate carbon to the symbionts in such a way as to maximize fitness benefit within a particular environmental context. We found a correlation between DSE and AMF PRLC across climatic conditions; we also found a fitness cost to increasing DSE colonization, which was negated by presence of Epichloë endophytes. These results suggest that selective pressure on the host is likely to favor host/symbiont relationships that structure the community of symbionts in the most beneficial way possible for the host, not necessarily favoring the individual symbiont that is most beneficial to the host in isolation. These results highlight the need for a more integrative, systems approach to the study of host/symbiont consortia.

  3. Project Radon

    International Nuclear Information System (INIS)

    Ekholm, S.

    1988-01-01

    The project started in March 1987. The objective is to perform radon monitoring in 2000 dwellings occupied by people employed by State Power Board and to continue to contribute to the development of radon filters. The project participates in developing methods for radon measurement and decontamination and in adapting the methods to large scale application. About 400 so called radon trace measurements (coarse measurement) and about 10 action measurements (decontamination measurement) have been made so far. Experience shows that methods are fully applicable and that the decontamination measures recommended give perfectly satisfactory results. It is also established that most of the houses with high radon levels have poor ventilation Many of them suffer from moisture and mould problems. The work planned for 1988 and 1989 will in addition to measurements be directed towards improvement of the measuring methods. An activity catalogue will be prepared in cooperation with ventilation enterprises. (O.S.)

  4. PARTNER Project

    CERN Multimedia

    Ballantine, A; Dixon-Altaber, H; Dosanjh, M; Kuchina, L

    2011-01-01

    Hadrontherapy uses particle beams to treat tumours located near critical organs and tumours that respond poorly to conventional radiation therapy. It has become evident that there is an emerging need for reinforcing research in hadrontherapy and it is essential to train professionals in this rapidly developing field. PARTNER is a 4-year Marie Curie Training project funded by the European Commission with 5.6 million Euros aimed at the creation of the next generation of experts. Ten academic institutes and research centres and two leading companies are participating in PARTNER, that is coordinated by CERN, forming a unique multidisciplinary and multinational European network. The project offers research and training opportunities to 25 young biologists, engineers, physicians and physicists and is allowing them to actively develop modern techniques for treating cancer in close collaboration with leading European Institutions. For this purpose PARTNER relies on cutting edge research and technology development, ef...

  5. Swedish projects

    International Nuclear Information System (INIS)

    Thunell, J.

    1992-01-01

    A description is given of research activities, concerning heating systems, which were carried out in Sweden during 1991. The main subject areas dealt with under the gas technology group within the area of heating systems were catalytic combustion, polyethylene materials, and gas applications within the paper and pulp industries. A list is given of the titles of project reports published during 1991 and of those begun during that year. Under the Swedish Centre for Gas Technology (SGC), the main areas of research regarding gas applications were polyethylene materials, industrial applications and the reduction of pollutant emissions. A detailed list is given of research projects which were in progress or proposed by March 1992 under the heating system gas technology research group in Sweden. This list also presents the aims and descriptions of the methods, etc. (AB)

  6. AVE project

    International Nuclear Information System (INIS)

    2004-01-01

    During 1998, ANAV began to optimize Human Resources to cope with the ERE and ANA-ANV integration. Project AVE was intended to achieve an orderly transfer of know-how, skills, attitudes and experiences. The most complex part was renovation of personnel with Operating Licenses. Nearly 140 people had joined the organization by late December 2003. This opportunity was seized to draw up a new Training Manual, and a common Initial Training Plan was designed for the two plants, accounting for the singularities of each one. The plan is divided into 5 modules: Common Training, Specific Training, PEI/CAT, Management, and on-the-job Training. The training environments were defined according to the nature of the capabilities to be acquired. Project AVE resulted in the merger of the Asco and Vandellos II Training services. (Author)

  7. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  8. ARTIST Project

    CSIR Research Space (South Africa)

    Ferguson, K

    2012-10-01

    Full Text Available Biennial Conference Presented by: Keith Ferguson Date: 9 October 2012 Mobile IPTV Broadcasting Platform Consortium: CSIR, UCT, ECA Funded by TIA 2008-2011 ARTIST Project Min time - sacrifice quality Max quality - sacrifice time Application Context... idth > ARTIST Platform Advertiser Client 1 Client 2 Client 3 Client 4 Sport channel News channel Wildlife channel Advert database Transaction database Transcoder Servers Media Switching Servers INTERNET Channel viewing Advert upload...

  9. CARA project

    International Nuclear Information System (INIS)

    Bergallo, Juan E.; Brasnarof, Daniel O.

    2000-01-01

    The CARA (Advanced Fuels for Argentine Reactors) Project successfully completed its first stage, phase one, last year. The performance of this fuel has been partially examined, using CNEA and CONUAR facilities and personnel. With the results obtained in this stage, determined by the corresponding tests and verification of the fuel behavior, the performance of the second stage started immediately afterwards. Works performed and results obtained during the development of the second stage are generally described in this paper. (author)

  10. Polytope projects

    CERN Document Server

    Iordache, Octavian

    2013-01-01

    How do you know what works and what doesn't? This book contains case studies highlighting the power of polytope projects for complex problem solving. Any sort of combinational problem characterized by a large variety of possibly complex constructions and deconstructions based on simple building blocks can be studied in a similar way. Although the majority of case studies are related to chemistry, the method is general and equally applicable to other fields for engineering or science.

  11. Projection Methods

    DEFF Research Database (Denmark)

    Wagner, Falko Jens; Poulsen, Mikael Zebbelin

    1999-01-01

    When trying to solve a DAE problem of high index with more traditional methods, it often causes instability in some of the variables, and finally leads to breakdown of convergence and integration of the solution. This is nicely shown in [ESF98, p. 152 ff.].This chapter will introduce projection...... methods as a way of handling these special problems. It is assumed that we have methods for solving normal ODE systems and index-1 systems....

  12. Project Phaseolus

    International Nuclear Information System (INIS)

    Anon.

    Research carried out through the Phaseolus Project of the 'Centro de Energia Nuclear na Agricultura' (CENA) Piracicaba, Sao Paulo State, Brazil, is described. It comprises the following subject s: plant breeding; nitrogen fixation; tissue cultures; proteins; photosynthetic efficiency; soil-plant interactions; electron microscopy of the golden mosaic virus; pest control; production of 15 N-enriched ammonium sulfate, and determination of elements in the beans plant. (M.A.) [pt

  13. Numatron project

    Energy Technology Data Exchange (ETDEWEB)

    Sugimoto, K [Osaka Univ., Toyonaka (Japan). Dept. of Physics; Hirao, Yasuo

    1977-04-01

    A project of high energy heavy ion acceleration is under consideration. The high energy heavy ions can produce highly condensed states of nuclei. A new phase of nucleus would be seen at the incident energy higher than 140 MeV/nucleon. High energy heavy ions causing high density states and meson emission will produce various new nuclides. Process of formation of atomic elements will be studied. Various fields of science can be also investigated by the high energy heavy ions. Spectroscopic study of multi-valent ions will be made high energy uranium. Study of materials for the fusion reactor is important. Impurity heavy ion from the wall of the fusion reactor may lose the energy of the reactor, and the characteristic features of heavy ions should be investigated. The highly ionized states of atoms are also produced by heavy ion injection into material. Several projects of heavy ion acceleration are in progress in the world. The Numatron project in Japan is to construct a combination machine of a Cockcroft type machine, three linear accelerator and a synchrotron. The planned energy of the machine is 670 MeV/nucleon. Technical problems are under investigation.

  14. Coloss project

    International Nuclear Information System (INIS)

    2005-01-01

    The COLOSS project was a shared-cost action, co-ordinated by IRSN within the Euratom Research Framework Programme 1998-2002. Started in February 2000, the project lasted three years. The work-programme performed by 19 partners was shaped around complementary activities aimed at improving severe accident codes. Unresolved risk-relevant issues regarding H2 production, melt generation and the source term were studied, through a large number of experiments such as a) dissolution of fresh and high burn-up UO 2 and MOX by molten Zircaloy, b) simultaneous dissolution of UO 2 and ZrO 2 by molten Zircaloy, c) oxidation of U-O-Zr mixtures by steam, d) degradation-oxidation of B 4 C control rods. Significant results have been produced from separate-effects, semi-global and large-scale tests on COLOSS topics. Break-through were achieved on some issues. Nevertheless, more data are needed for consolidation of the modelling on burn-up effects on UO 2 and MOX dissolution and on oxidation of U-O-Zr and B 4 C-metal mixtures. There was experimental evidence that the oxidation of these mixtures can contribute significantly to the large H2 production observed during the reflooding of degraded cores under severe accident conditions. Based on the experimental results obtained on the COLOSS topics, corresponding models were developed and were successfully implemented in several severe accident codes. Upgraded codes were then used for plant calculations to evaluate the consequences of new models on key severe accident sequences occurring in different plants designs involving B 4 C control rods (EPR, BWR, VVER- 1000) as well as in the TMI-2 accident. The large series of plant calculations involved sensitivity studies and code benchmarks. Main severe accident codes in use in the EU for safety studies were used such as ICARE/CATHARE, SCDAP/RELAP5, ASTEC, MELCOR and MAAP4. This activity enabled: a) the assessment of codes to calculate core degradation, b) the identification of main

  15. Baseline process description for simulating plutonium oxide production for precalc project

    Energy Technology Data Exchange (ETDEWEB)

    Pike, J. A. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-10-26

    Savannah River National Laboratory (SRNL) started a multi-year project, the PreCalc Project, to develop a computational simulation of a plutonium oxide (PuO2) production facility with the objective to study the fundamental relationships between morphological and physicochemical properties. This report provides a detailed baseline process description to be used by SRNL personnel and collaborators to facilitate the initial design and construction of the simulation. The PreCalc Project team selected the HB-Line Plutonium Finishing Facility as the basis for a nominal baseline process since the facility is operational and significant model validation data can be obtained. The process boundary as well as process and facility design details necessary for multi-scale, multi-physics models are provided.

  16. Project Exodus

    Science.gov (United States)

    1990-01-01

    Project Exodus is an in-depth study to identify and address the basic problems of a manned mission to Mars. The most important problems concern propulsion, life support, structure, trajectory, and finance. Exodus will employ a passenger ship, cargo ship, and landing craft for the journey to Mars. These three major components of the mission design are discussed separately. Within each component the design characteristics of structures, trajectory, and propulsion are addressed. The design characteristics of life support are mentioned only in those sections requiring it.

  17. CAREM Project

    International Nuclear Information System (INIS)

    Ishida, Viviana; Gomez, Silvia

    2001-01-01

    CAREM project consists on the development and design of an advanced nuclear power plant. CAREM is a very low power innovative reactor conceived with new generation design solutions. Based on an indirect cycle integrated light water reactor using enriched uranium, CAREM has some distinctive features that greatly simplify the reactor and also contribute to a high level of safety: integrated primary system, primary system cooling by natural convection, self pressurization, and passive safety systems. In order to verify its innovative features the construction of a prototype is planned. (author)

  18. PORTNUS Project

    Energy Technology Data Exchange (ETDEWEB)

    Loyal, Rebecca E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-07-14

    The objective of the Portunus Project is to create large, automated offshore ports that will the pace and scale of international trade. Additionally, these ports would increase the number of U.S. domestic trade vessels needed, as the imported goods would need to be transported from these offshore platforms to land-based ports such as Boston, Los Angeles, and Newark. Currently, domestic trade in the United States can only be conducted by vessels that abide by the Merchant Marine Act of 1920 – also referred to as the Jones Act. The Jones Act stipulates that vessels involved in domestic trade must be U.S. owned, U.S. built, and manned by a crew made up of U.S. citizens. The Portunus Project would increase the number of Jones Act vessels needed, which raises an interesting economic concern. Are Jones Act ships more expensive to operate than foreign vessels? Would it be more economically efficient to modify the Jones Act and allow vessels manned by foreign crews to engage in U.S. domestic trade? While opposition to altering the Jones Act is strong, it is important to consider the possibility that ship-owners who employ foreign crews will lobby for the chance to enter a growing domestic trade market. Their success would mean potential job loss for thousands of Americans currently employed in maritime trade.

  19. FLORAM project

    Energy Technology Data Exchange (ETDEWEB)

    Zulauf, W E [Sao Paolos Environmental Secretariat, Sao Paolo (Brazil); Goelho, A S.R. [Riocell, S.A. (Brazil); Saber, A [IEA-Instituto de Estudos Avancados (Brazil); and others

    1996-12-31

    The project FLORAM was formulated at the `Institute for Advanced Studies` of the University of Sao Paulo. It aims at decreasing the level of carbon dioxide in the atmosphere and thus curbing the green-house effect by way of a huge effort of forestation and reforestation. The resulting forests when the trees mature, will be responsible for the absorption of about 6 billion tons of excess carbon. It represents 5 % of the total amount of CO{sub 2} which is in excess in the earth`s atmosphere and represents 5 % of the available continental surfaces which can be forested as well. Therefore, if similar projects are implemented throughout the world, in theory all the exceeding CO{sub 2}, responsible for the `greenhouse effect`, (27 % or 115 billion tons of carbon) would be absorbed. Regarding this fact, there would be a 400 million hectar increase of growing forests. FLORAM in Brazil aims to plant 20.000.000 ha in 2 years at a cost of 20 billion dollars. If it reaches its goals that will mean that Brazil will have reforested an area almost half as big as France. (author)

  20. FLORAM project

    Energy Technology Data Exchange (ETDEWEB)

    Zulauf, W.E. [Sao Paolos Environmental Secretariat, Sao Paolo (Brazil); Goelho, A.S.R. [Riocell, S.A. (Brazil); Saber, A. [IEA-Instituto de Estudos Avancados (Brazil)] [and others

    1995-12-31

    The project FLORAM was formulated at the `Institute for Advanced Studies` of the University of Sao Paulo. It aims at decreasing the level of carbon dioxide in the atmosphere and thus curbing the green-house effect by way of a huge effort of forestation and reforestation. The resulting forests when the trees mature, will be responsible for the absorption of about 6 billion tons of excess carbon. It represents 5 % of the total amount of CO{sub 2} which is in excess in the earth`s atmosphere and represents 5 % of the available continental surfaces which can be forested as well. Therefore, if similar projects are implemented throughout the world, in theory all the exceeding CO{sub 2}, responsible for the `greenhouse effect`, (27 % or 115 billion tons of carbon) would be absorbed. Regarding this fact, there would be a 400 million hectar increase of growing forests. FLORAM in Brazil aims to plant 20.000.000 ha in 2 years at a cost of 20 billion dollars. If it reaches its goals that will mean that Brazil will have reforested an area almost half as big as France. (author)

  1. SISCAL project

    Science.gov (United States)

    Santer, Richard P.; Fell, Frank

    2003-05-01

    The first "ocean colour" sensor, Coastal Zone Color Scanner (CZCS), was launched in 1978. Oceanographers learnt a lot from CZCS but it remained a purely scientific sensor. In recent years, a new generation of satellite-borne earth observation (EO) instruments has been brought into space. These instruments combine high spectral and spatial resolution with revisiting rates of the order of one per day. More instruments with further increased spatial, spectral and temporal resolution will be available within the next years. In the meantime, evaluation procedures taking advantage of the capabilities of the new instruments were derived, allowing the retrieval of ecologically important parameters with higher accuracy than before. Space agencies are now able to collect and to process satellite data in real time and to disseminate them via the Internet. It is therefore meanwhile possible to envisage using EO operationally. In principle, a significant demand for EO data products on terrestrial or marine ecosystems exists both with public authorities (environmental protection, emergency management, natural resources management, national parks, regional planning, etc) and private companies (tourist industry, insurance companies, water suppliers, etc). However, for a number of reasons, many data products that can be derived from the new instruments and methods have not yet left the scientific community towards public or private end users. It is the intention of the proposed SISCAL (Satellite-based Information System on Coastal Areas and Lakes) project to contribute to the closure of the existing gap between space agencies and research institutions on one side and end users on the other side. To do so, we intend to create a data processor that automatically derives and subsequently delivers over the Internet, in Near-Real-Time (NRT), a number of data products tailored to individual end user needs. The data products will be generated using a Geographical Information System (GIS

  2. Project Financing

    OpenAIRE

    S. GATTI

    2005-01-01

    Στην εισαγωγή της παρούσας εργασίας δίνεται ο ορισμός του project financing, τα ιστορικά στοιχεία και οι τάσεις αγοράς του. Στο πρώτο κεφάλαιο αναφέρεται γιατί οι εταιρείες προτιμούν την χρηματοδότηση με project financing. Γίνεται λόγος για τα πλεονεκτήματά του έναντι της άμεσης χρηματοδότησης, καθώς και για τα μειονεκτήματα του project financing. Στο δεύτερο κεφάλαιο παρουσιάζονται τα χρηματοοικονομικά στοιχεία και ο ρόλος του χρηματοοικονομικού συμβούλου. Στην τρίτη ενότητα γίνεται η αναγνώ...

  3. Project: Ultracentrifuges

    International Nuclear Information System (INIS)

    Olea C, O.

    1990-07-01

    The trans elastic ultracentrifuge of magnetic suspension, is an instrument that arose of an interdisciplinary group directed by the Dr. James Clark Keith where it was projected, designed and built a centrifuge that didn't exist, to be applied in forced diffusion of uranium, like one of the many application fields. The written present, has as purpose to give to know the fundamental physical principles of this technology, its fundamental characteristics of design, the application of this in the separation process of isotopes, as well as the previous studies and essential control parameters in the experimental processes, the same thing that, the most outstanding results and the detection systems used in the confirmation and finally, the carried out potential applications of the principles of the ultracentrifugation technology. (Author)

  4. ENVISION Project

    CERN Multimedia

    Ballantine, A; Dixon-Altaber, H; Dosanjh, M; Kuchina, L

    2011-01-01

    Hadrontherapy is a highly advanced technique of cancer radiotherapy that uses beams of charged particles (ions) to destroy tumour cells. While conventional X-rays traverse the human body depositing radiation as they pass through, ions deliver most of their energy at one point. Hadrontherapy is most advantageous once the position of the tumour is accurately known, so that healthy tissues can be protected. Accurate positioning is a crucial challenge for targeting moving organs, as in lung cancer, and for adapting the irradiation as the tumour shrinks with treatment. Therefore, quality assurance becomes one of the most relevant issues for an effective outcome of the cancer treatment. In order to improve the quality assurance tools for hadrontherapy, the European Commission is funding ENVISION, a 4-year project that aims at developing solutions for: real-• time non invasive monitoring • quantitative imaging • precise determination of delivered dose • fast feedback for optimal treatment planning • real-t...

  5. EUROTRAC projects

    International Nuclear Information System (INIS)

    Slanina, J.; Arends, B.G.; Wyers, G.P.

    1992-07-01

    The projects discussed are BIATEX (BIosphere-ATmosphere EXchange of pollutants), ACE (Acidity in Clouds Experiment) and GCE (Ground-based Cloud Experiment). ECN also coordinates BIATEX and contributes to the coordination of EUROTRAC. Research in BIATEX is aimed at the development of equipment, by which atmosphere-surface interactions of air pollution can be quantified. A ion chromatograph, connected to a rotating denuder, is developed to be applicated in the field for on-line analysis of denuder extracts and other samples. To investigate dry deposition of ammonia a continuous-flow denuder has been developed. A thermodenuder system to measure the concentrations of HNO 3 and NH 4 NO 3 in the ambient air is optimized to determine depositions and is part of the ECN monitoring station in Zegveld, Netherlands. An aerosol separation technique, based on a cyclone separator, has also been developed. All this equipment has been used in field experiments above wheat and heather. An automated monitoring station for long-term investigations of NH 3 , HNO 3 and SO 2 dry deposition on grassland and the impact of the deposition on the presence and composition of water films has been set up and fully tested. Research in GCE concerns the uptake and conversion of air pollution in clouds (cloud chemistry). Measuring equipment from several collaborative institutes has been specified and calibrated in a cloud chamber at ECN. The ECN contribution is the determination of the gas phase composition and the micro-physical characterization of the clouds. Measurement campaigns were carried out in the Po area (Italy) in fog, and in Kleiner Feldberg near Frankfurt, Germany, in orographic clouds. Estimations are given of the deposition of fog water and cloud water on forests in the Netherlands and the low mountain range in Germany. The project ACE was not started because of financial reasons and will be reconsidered. 26 figs., 1 tab., 3 apps., 34 refs

  6. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  7. Project LASER

    Science.gov (United States)

    1990-01-01

    NASA formally launched Project LASER (Learning About Science, Engineering and Research) in March 1990, a program designed to help teachers improve science and mathematics education and to provide 'hands on' experiences. It featured the first LASER Mobile Teacher Resource Center (MTRC), is designed to reach educators all over the nation. NASA hopes to operate several MTRCs with funds provided by private industry. The mobile unit is a 22-ton tractor-trailer stocked with NASA educational publications and outfitted with six work stations. Each work station, which can accommodate two teachers at a time, has a computer providing access to NASA Spacelink. Each also has video recorders and photocopy/photographic equipment for the teacher's use. MTRC is only one of the five major elements within LASER. The others are: a Space Technology Course, to promote integration of space science studies with traditional courses; the Volunteer Databank, in which NASA employees are encouraged to volunteer as tutors, instructors, etc; Mobile Discovery Laboratories that will carry simple laboratory equipment and computers to provide hands-on activities for students and demonstrations of classroom activities for teachers; and the Public Library Science Program which will present library based science and math programs.

  8. Project Longshot

    Science.gov (United States)

    West, J. Curtis; Chamberlain, Sally A.; Stevens, Robert; Pagan, Neftali

    1989-01-01

    Project Longshot is an unmanned probe to our nearest star system, Alpha Centauri, 4.3 light years away. The Centauri system is a trinary system consisting of two central stars (A and B) orbiting a barycenter, and a third (Proxima Centauri) orbiting the two. The system is a declination of -67 degrees. The goal is to reach the Centauri system in 50 years. This time space was chosen because any shorter time would be impossible of the relativistic velocities involved, and any greater time would be impossible because of the difficulty of creating a spacecraft with such a long lifetime. Therefore, the following mission profile is proposed: (1) spacecraft is assembled in Earth orbit; (2) spacecraft escapes Earth and Sun in the ecliptic with a single impulse maneuver; (3) spacecraft changed declination to point toward Centauri system; (4) spacecraft accelerates to 0.1c; (5) spacecraft coasts at 0.1c for 41 years; (6) spacecraft decelerates upon reaching Centauri system; and (7) spacecraft orbits Centauri system, conducts investigations, and relays data to Earth. The total time to reach the Centauri system, taking into consideration acceleration and deceleration, will be approximately 50 years.

  9. Coal Power Systems strategic multi-year program plans

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-02-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL).

  10. Herbicide volatilization trumps runoff losses, a multi-year investigation

    Science.gov (United States)

    Surface runoff and volatilization are two processes critical to herbicide off-site transport. To determine the relevance of these off-site transport mechanisms, runoff and turbulent vapor fluxes were simultaneously monitored on the same site for eight years. Site location, herbicide formulations, ...

  11. Connecticut Children's Medical Center multi-year branding campaign.

    Science.gov (United States)

    Botvin, J

    2000-01-01

    As the only children's hospital in the state, Connecticut Children's Medical Center was challenged by the inherent complacency of parents. It met the challenge through a multi-level marketing effort which included television and radio, community outreach and strong media relations. By emphasizing the unique nature of children, the campaign affirms the need for a specialized children's health center.

  12. Multi-year satellite observations of tropospheric NO2 concentrations ...

    Indian Academy of Sciences (India)

    39

    Continuous measurements of atmospheric trace gases are now available that can ... Style Definition: Heading 2. Formatted: Right: ... The major anthropogenic sources of NO2 are industrial and vehicular emissions, soil emissions. (natural) and ...

  13. Development of a multi-year climate prediction model | Alexander ...

    African Journals Online (AJOL)

    The available water resources in Southern Africa are rapidly approaching the limits of economic exploitation. The situation is compounded by claims that global warming will have a serious adverse effect on future water supplies. There was therefore an urgent need to characterise the numerical properties of the ...

  14. Environmental Quality Information Analysis Center multi-year plan

    International Nuclear Information System (INIS)

    Rivera, R.G.; Das, S.; Walsh, T.E.

    1992-09-01

    An information analysis center (IAC) is a federal resource that provides technical information for a specific technology field. An IAC links an expert technical staff with an experienced information specialist group, supported by in-house or external data bases to provide technical information and maintain a corporate knowledge in a technical area. An IAC promotes the rapid transfer of technology among its users and provides assistance in adopting new technology and predicting and assessing emerging technology. This document outlines the concept, requirements, and proposed development of an Environmental Quality IAC (EQIAC). An EQIAC network is composed of several nodes, each of which has specific technology capabilities. This document outlines strategic and operational objectives for the phased development of one such node of an EQIAC network

  15. Coal Power Systems strategic multi-year program plans; TOPICAL

    International Nuclear Information System (INIS)

    None

    2001-01-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL)

  16. Project Success in Agile Development Software Projects

    Science.gov (United States)

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  17. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  18. Organizations, projects and culture

    NARCIS (Netherlands)

    J. van Cleeff; Pieter van Nispen tot Pannerden

    2016-01-01

    Purpose: to explore and demonstrate the effects of organizational culture on projects, in particular project culture and project management style. Methodology/approach: descriptive and explorative; through students’ groups. Findings: the cultural relationship between organizations, their projects

  19. Evaluation of Project Achievements in VOMARE -project

    OpenAIRE

    Kokkarinen, Eeva

    2011-01-01

    The purpose of the thesis is to study the achievements of VOMARE –project from the Finnish Lifeboat Institutions perspective. The organisation is a roof organisation for voluntary maritime rescue operation in Finland. The Finnish Lifeboat Institution is a lead partner in VOMARE –project which is EU funded project and the aim of the project is to start voluntary rescue operations in Estonia. The theoretical part of the work is divided into two main categories; project management and planni...

  20. Why Don't They Just Give Us Money? Project Cost Estimating and Cost Reporting

    Science.gov (United States)

    Comstock, Douglas A.; Van Wychen, Kristin; Zimmerman, Mary Beth

    2015-01-01

    Successful projects require an integrated approach to managing cost, schedule, and risk. This is especially true for complex, multi-year projects involving multiple organizations. To explore solutions and leverage valuable lessons learned, NASA's Virtual Project Management Challenge will kick off a three-part series examining some of the challenges faced by project and program managers when it comes to managing these important elements. In this first session of the series, we will look at cost management, with an emphasis on the critical roles of cost estimating and cost reporting. By taking a proactive approach to both of these activities, project managers can better control life cycle costs, maintain stakeholder confidence, and protect other current and future projects in the organization's portfolio. Speakers will be Doug Comstock, Director of NASA's Cost Analysis Division, Kristin Van Wychen, Senior Analyst in the GAO Acquisition and Sourcing Management Team, and Mary Beth Zimmerman, Branch Chief for NASA's Portfolio Analysis Branch, Strategic Investments Division. Moderator Ramien Pierre is from NASA's Academy for Program/Project and Engineering Leadership (APPEL).

  1. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    Full Text Available Modern management theory treats all complex tasks and duties like projects and make these projects possible to be managed by a particular organizational-management concept in order to achieve a goal effectively. A large number of jobs and tasks performed in the system of defense or for defense purposes have the characteristics of projects. Project management is both a skill and a science of monitoring human, material, financial, energy and other resources to achieve required objectives within the given limits: deadlines, time, budget, possibility of realization and the satisfaction of the interests of all project participants. Project management is a traditional area of applied (or functional management focused on managing complex and uncertain situations with defined goals. Introduction In conditions of rapid change and high uncertainty, only adaptive organizations survive, i. e. those that are able not only to react quickly to changes but also to proactively take advantage of changes. Development of project management The biggest influence on the development of the area had complex jobs within the engineering profession. In parallel with the traditional approach new approaches began to develop, while the traditional one still remained in use. Contrary to the traditional engineering approach, a dynamic model first developed in order to respond to demands for greater control of costs. Project management Project management is a skill and knowledge of human and material resources to achieve set objectives within prescribed limits: deadlines, time, budget, possibility of realization, and the satisfaction of all participants in the project. In order to realize a project effectively, it is necessary to manage it rationally. Planning and project management A project plan is a document that allows all team members insight on where to go, when to start and when to arrive, what is necessary to be done in order to achieve the project objectives and what

  2. Storytelling in Projects

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas; Andersen, Peter Bøgh

    2006-01-01

    project managers should not only be concerned with project plans, but also with project stories. In this paper we explore some basic principles for transforming project plans into appealing stories. We discuss what may happen to stories once they are released into public space. And we illustrate how......Plans and stories are two different ways of communicating about projects. Project plans are formalized descriptions, primarily supporting coordination. Project stories are accounts whose primary function is emotional appeal. Project stories influence the projects’ chances of success. Therefore...... the possibilities of telling favorable stories may have repercussions on the project planning....

  3. The Ethiopian Flora Project

    DEFF Research Database (Denmark)

    Demissew, Sebsebe; Brochmann, Christian; Kelbessa, Ensermu

    2011-01-01

    The account reviews and analyses the scietific projects derived from activities in connection with the Ethiopian Flora Project, including the [Ethiopian] Monocot Project, the Afro-alpine "Sky-island" project, the Vegetation and Ecological Conditions of Plantations Project, the Fire Ecology Projec...

  4. Capital projects coordination

    Directory of Open Access Journals (Sweden)

    Zubović Jovan

    2004-01-01

    Full Text Available This paper looks at the difficulties of managing modem capital projects and endeavors to reduce the complexities to simpler and more understandable terms. It examines the project environment, defines project management and discusses points of difference from traditional management. In the second part of the paper are presented fundamentals for project success for different types of projects.

  5. From project management to project leadership

    NARCIS (Netherlands)

    Braun, F.; Avital, M.

    2010-01-01

    It is virtually a truism that good leadership practices can help project managers with attaining the desired project outcome. However, a better understanding of which leadership practices enable project managers to be more effective warrants further investigation. Subsequently, in this study, we

  6. An IS Project Management Course Project

    Science.gov (United States)

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  7. Managing Projects for Change: Contextualised Project Management

    Science.gov (United States)

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  8. Collective action, clientelism and connectivity

    DEFF Research Database (Denmark)

    Shami, Mahvish

    that the unequal relationship between landlords and peasants does not, in and by itself, block peasant collective action. Rather, it is the interaction between clientelism and isolation that allow patrons to block community based projects. Despite still relying on powerful landlords, peasants in connected villages...... face no such constraints. On the contrary, their patrons assisted them in their collective endeavours, making the hierarchical network an added resource for peasants to rely upon....

  9. A successful waste stream analysis on a large construction project in a radiologically controlled area

    International Nuclear Information System (INIS)

    Kennicott, M.; Richardson, D.; Starke, T.P.

    1997-01-01

    The Los Alamos National Laboratory (the Laboratory) Chemistry and Metallurgy Research (CMR) Facility, constructed in 1952, is currently under going a major, multi-year demolition and construction project. Many of the operations required under this project (i.e., design, demolition, decontamination, construction, and waste management) mimic the processes required of a large scale decontamination and decommissioning (D and D) job and are identical to the requirements of any of several upgrades projects anticipated for the laboratory and other Department of Energy (DOE) sites. For these reasons the CMR upgrades Project is seen as an ideal model facility--to test the application and measure the success of waste minimization techniques which could be implemented for any similar projects. The purpose of this paper will be to discuss the successful completion of a waste stream analysis. The analyses performed was to measure the potential impact of waste generation, in terms of volume and costs, for a reconfiguration option being considered to change the approach and execution of the original project

  10. I-15 North Project

    Science.gov (United States)

    2013-11-05

    Goals of this project were as follows: (1) Conduct a comprehensive evaluation study on Nevada's I-15 North Design Build Project; (2) Analyze project implementation with respect to construction zone rules by which the contractor had to abide; (3) Anal...

  11. Web Project Management

    OpenAIRE

    Suralkar, Sunita; Joshi, Nilambari; Meshram, B B

    2013-01-01

    This paper describes about the need for Web project management, fundamentals of project management for web projects: what it is, why projects go wrong, and what's different about web projects. We also discuss Cost Estimation Techniques based on Size Metrics. Though Web project development is similar to traditional software development applications, the special characteristics of Web Application development requires adaption of many software engineering approaches or even development of comple...

  12. USAID Anticorruption Projects Database

    Data.gov (United States)

    US Agency for International Development — The Anticorruption Projects Database (Database) includes information about USAID projects with anticorruption interventions implemented worldwide between 2007 and...

  13. Project 2010 Bible

    CERN Document Server

    Marmel, Elaine

    2010-01-01

    A comprehensive reference on the latest version of the leading enterprise project management software: Microsoft Project 2010. Microsoft Project allows users to manage business activities effectively by sharing project information, performing modeling and scenario analyses, standardizizing reporting processes, and more. This soup-to-nuts reference covers both the professional and standard versions of the latest iteration of Microsoft Project, as well as Project Server, so that you can efficiently manage your business projects. Veteran author Elaine Marmel begins with an overview of project man

  14. Project 2010 For Dummies

    CERN Document Server

    Muir, Nancy C

    2010-01-01

    A friendly reference guide to Microsoft Project, the leading enterprise project management software. As project management software, Microsoft Project allows you to oversee your business activities effectively. You can manage resources, share project info, perform modeling and scenario analysis, and standardize reporting processes. This easy-to-understand guide is completely updated to cover the latest changes and newest enhancements to Project 2010 and shows you how to get Project 2010 to work for you. After an introduction to basic project management concepts, you'll discover the mechanics o

  15. Project development symposium

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    Papers were presented on the following: project evaluation; case studies - minerals; finance; applied finance; legal; manpower/industrial relations; and new technologies. Those papers on the coal industry were: mine planning for coal project development; the planning and management of a lignite exploration contract in Thailand; development of the West Cliff extended project; Ulan: a resource development; Saxonvale mine development a case study in project planning and project management; the role of marketing in the development of a new coal project; technical support for coal marketing; infrastructure development for the Ulan project; underground mine project developments; the bucketwheel excavator at Goonyella - a case study; tax aspects of mining development projects; cost of capital mining development projects; and trends in development project finance. 16 papers were abstracted separately.

  16. Canadian snow and sea ice: historical trends and projections

    Science.gov (United States)

    Mudryk, Lawrence R.; Derksen, Chris; Howell, Stephen; Laliberté, Fred; Thackeray, Chad; Sospedra-Alfonso, Reinel; Vionnet, Vincent; Kushner, Paul J.; Brown, Ross

    2018-04-01

    The Canadian Sea Ice and Snow Evolution (CanSISE) Network is a climate research network focused on developing and applying state of the art observational data to advance dynamical prediction, projections, and understanding of seasonal snow cover and sea ice in Canada and the circumpolar Arctic. Here, we present an assessment from the CanSISE Network on trends in the historical record of snow cover (fraction, water equivalent) and sea ice (area, concentration, type, and thickness) across Canada. We also assess projected changes in snow cover and sea ice likely to occur by mid-century, as simulated by the Coupled Model Intercomparison Project Phase 5 (CMIP5) suite of Earth system models. The historical datasets show that the fraction of Canadian land and marine areas covered by snow and ice is decreasing over time, with seasonal and regional variability in the trends consistent with regional differences in surface temperature trends. In particular, summer sea ice cover has decreased significantly across nearly all Canadian marine regions, and the rate of multi-year ice loss in the Beaufort Sea and Canadian Arctic Archipelago has nearly doubled over the last 8 years. The multi-model consensus over the 2020-2050 period shows reductions in fall and spring snow cover fraction and sea ice concentration of 5-10 % per decade (or 15-30 % in total), with similar reductions in winter sea ice concentration in both Hudson Bay and eastern Canadian waters. Peak pre-melt terrestrial snow water equivalent reductions of up to 10 % per decade (30 % in total) are projected across southern Canada.

  17. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  18. Introduction to the Project

    DEFF Research Database (Denmark)

    Kuhn, Johan M.; Malchow-Møller, Nikolaj; Sørensen, Anders

    In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two...... important qualifications for the understanding of the contributions and results established in the project....

  19. The virtual GULLIVER project

    NARCIS (Netherlands)

    Trappl, R.; Nijholt, Antinus; Stuk, M.; Zwiers, Jakob

    2002-01-01

    In this paper we discuss our virtual reality project Gulliver. This project is part of a more comprehensive project conceived by two artists, Matjaž Štuk and Alena Hudcovicová, called “Gulliver’s Museum of Living Art��?. Our part of the project involves a virtual reality version of Swift’s Gulliver

  20. Innovations in project activities

    Directory of Open Access Journals (Sweden)

    Serbskaya O.V.

    2016-11-01

    Full Text Available this article considers the ways of project management, models of project management: classical model and the model of flexible designing Agile, pays more attention to the process of project management using Agile model and to the problems of using the project management models in modern conditions.

  1. The 100 People Project

    Science.gov (United States)

    McLeod, Keri

    2007-01-01

    This article describes the 100 People Project and how the author integrates the project in her class. The 100 People Project is a nonprofit organization based in New York City. The organization poses the question: If there were only 100 people in the world, what would the world look like? Through the project, students were taught about ethics in…

  2. Earth System Science Project

    Science.gov (United States)

    Rutherford, Sandra; Coffman, Margaret

    2004-01-01

    For several decades, science teachers have used bottles for classroom projects designed to teach students about biology. Bottle projects do not have to just focus on biology, however. These projects can also be used to engage students in Earth science topics. This article describes the Earth System Science Project, which was adapted and developed…

  3. Projects as value constellations

    DEFF Research Database (Denmark)

    Laursen, Markus

    Creating value has been outlined as very central to projects applying the organizational perspective to projects. It has been suggested that value is created in value constellations or project networks, where actors work together to create value. However, research on the value creation process...... in value constellations is scarce, and through an exploratory study of two project networks in a cultural setting we investigate how value is created in value constellations. We outline how each project may be a distinct type of value constellation, one project creates value for the partners of the network...... as a consortium, and the project creates value primarily for others as a facilitator....

  4. Project stakeholder management

    CERN Document Server

    Eskerod, Pernille

    2013-01-01

    Carrying out a project as planned is not a guarantee for success. Projects may fail because project management does not take the requirements, wishes and concerns of stakeholders sufficiently into account. Projects can only be successful though contributions from stakeholders. And in the end, it is the stakeholders that evaluate whether they find that the project is a success. To manage stakeholders effectively, you need to know your stakeholders, their behaviours and attitudes towards the project. In Project Stakeholder Management, the authors give guidance on how to adopt an analytical and s

  5. Modern project-management

    CERN Multimedia

    CERN. Geneva

    2003-01-01

    This lecture will focus on the following issues: - The current state of the art in Project Management, especially the integration of Project Management with general management activities, and the integrated view of resources allocation. - Overview of the project life cycle, the phases and the deliverables - Necessity and limits of planning in a research environment - Organizational aspects of the projects the roles of the stakeholders - How to get the resources when they are needed - Risk Management in Projects - Earned value - How to keep a project on track (schedule and budget) - Management of the suppliers - Closing of the project

  6. Introduction to the Project

    DEFF Research Database (Denmark)

    Kuhn, Johan M.; Malchow-Møller, Nikolaj; Sørensen, Anders

    In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two ...... important qualifications for the understanding of the contributions and results established in the project.......In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two...

  7. Choice of large projects

    Energy Technology Data Exchange (ETDEWEB)

    Harris, R

    1978-08-01

    Conventional cost/benefit or project analysis has generally not taken into account circumstances in which the project under consideration is large enough that its introduction to the economy would have significant general equilibrium effects. In this paper, rules are examined that would indicate whether such large projects should be accepted or rejected. The rules utilize information yielded by before-project and after-project equilibrium prices and production data. Rules are developed for the undistorted ''first-best'' case, the case in which the fixed costs of the project are covered by distortionary taxation, and for the case of projects producing public goods. 34 references.

  8. Project Half Double

    DEFF Research Database (Denmark)

    Svejvig, Per; Gerstrøm, Anna; Frederiksen, Signe Hedeboe

    The Half Double mission: Project Half Double has a clear mission. We want to succeed in finding a project methodology that can increase the success rate of our projects while increasing the development speed of new products and services. We are convinced that by doing so we can strengthen...... the competitiveness of Denmark and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “Projects in half the time with double the impact” where projects in half the time should be understood as half the time to impact (benefit realization, effect is achieved......) and not as half the time for project execution. The Half Double project journey: It all began in May 2013 when we asked ourselves: How do we create a new and radical project paradigm that can create successful projects? Today we are a movement of hundreds of passionate project people, and it grows larger...

  9. Project Finance: Basic Components

    OpenAIRE

    Alfieri Li Ojeda, Jaime

    2015-01-01

    The natural speed of the contemporary world demands large investment projects which require specialized financial techniques such as Project Finance, defined as a fund to finance investment projects of great magnitude. Every Project Finance involves a wide range of elements such as promoters, government, contractors andsuppliers, among others, that will ensure project success. La rapidez del mundo contemporáneo exige que los grandes proyectos de inversión requieran de técnicas financieras ...

  10. Project delivery system (PDS)

    CERN Document Server

    2001-01-01

    As business environments become increasingly competitive, companies seek more comprehensive solutions to the delivery of their projects. "Project Delivery System: Fourth Edition" describes the process-driven project delivery systems which incorporates the best practices from Total Quality and is aligned with the Project Management Institute and ISO Quality Standards is the means by which projects are consistently and efficiently planned, executed and completed to the satisfaction of clients and customers.

  11. IT Project Management Metrics

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available Many software and IT projects fail in completing theirs objectives because different causes of which the management of the projects has a high weight. In order to have successfully projects, lessons learned have to be used, historical data to be collected and metrics and indicators have to be computed and used to compare them with past projects and avoid failure to happen. This paper presents some metrics that can be used for the IT project management.

  12. Methodologies of Project Management

    Directory of Open Access Journals (Sweden)

    Wojciech Macek

    2011-07-01

    Full Text Available This paper presents comparison of three most popular project management standardsbelonging to a wider group of models (for example, PMBOK, Prince 2, CMMI, ISO 10006,BS 6079, IPMA Competence Baseline, European Commission Project Cycle ManagementGuidelines. The author discusses methods of project management according to PMBoK,Prince 2 and ISO 10006, some chosen criteria and fields of knowledge, such as generalregulations of standards, project range management, resources management, and processesconnected with risk, systems of project quality management.

  13. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2007

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Diefenderfer, Heida L.; Borde, Amy B.; Dawley, Earl M.; Ebberts, Blaine D.; Putman, Douglas A.; Roegner, G. C.; Russell, Micah; Skalski, John R.; Thom, Ronald M.; Vavrinec, John

    2008-10-01

    The goal of this multi-year study (2004-2010) is to develop a methodology to evaluate the cumulative effects of multiple habitat restoration projects intended to benefit ecosystems supporting juvenile salmonids in the lower Columbia River and estuary. Literature review in 2004 revealed no existing methods for such an evaluation and suggested that cumulative effects could be additive or synergistic. Field research in 2005, 2006, and 2007 involved intensive, comparative studies paired by habitat type (tidal swamp vs. marsh), trajectory (restoration vs. reference site), and restoration action (tide gate vs. culvert vs. dike breach). The field work established two kinds of monitoring indicators for eventual cumulative effects analysis: core and higher-order indicators. Management implications of limitations and applications of site-specific effectiveness monitoring and cumulative effects analysis were identified.

  14. Project Half Double

    DEFF Research Database (Denmark)

    Svejvig, Per; Ehlers, Michael; Adland, Karoline Thorp

    activities carried out within the framework of the projects. The formal part of Project Half Double was initiated in June 2015. We started out by developing, refining and testing the Half Double methodology on seven pilot projects in the first phase of the project, which will end June 2016. The current......Project Half Double has a clear mission to succeed in finding a project methodology that can increase the success rate of our projects while increasing the speed at which we generate new ideas and develop new products and services. Chaos and complexity should be seen as a basic condition...... and as an opportunity rather than a threat and a risk. We are convinced that by doing so, we can strengthen Denmark’s competitiveness and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “projects in half the time with double the impact”, where projects in half the time...

  15. Needs analysis and project schedule for the Los Alamos National Laboratory (LANL) Health Physics Analysis Laboratory (HPAL) upgrade

    International Nuclear Information System (INIS)

    Rhea, T.A.; Rucker, T.L.; Stafford, M.W.

    1990-01-01

    This report is a needs assessment and project schedule for the Health Physics Analysis Laboratory (HPAL) upgrade project at Los Alamos National Laboratory (LANL). After reviewing current and projected HPAL operations, two custom-developed laboratory information management systems (LIMS) for similar facilities were reviewed; four commercially available LIMS products were also evaluated. This project is motivated by new regulations for radiation protection and training and by increased emphasis on quality assurance (QA). HPAL data are used to: protect the health of radiation workers; document contamination levels for transportation of radioactive materials and for release of materials to the public for uncontrolled use; and verify compliance with environmental emission regulations. Phase 1 of the HPAL upgrade project concentrates on four types of counting instruments which support in excess of 90% of the sample workload at the existing central laboratories. Phase 2 is a refinement phase and also integrates summary-level databases on the central Health, Safety, and Environment (HSE) VAX. Phase 3 incorporates additional instrument types and integrates satellite laboratories into the HPAL LIMS. Phase 1 will be a multi-year, multimillion dollar project. The temptation to approach the upgrade of the HPAL program in a piece meal fashion should be avoided. This is a major project, with clearly-defined goals and priorities, and should be approached as such. Major programmatic and operational impacts will be felt throughout HSE as a result of this upgrade, so effective coordination with key customer contacts will be critical

  16. Project management case studies

    CERN Document Server

    Kerzner, Harold R

    2013-01-01

    A new edition of the most popular book of project management case studies, expanded to include more than 100 cases plus a ""super case"" on the Iridium Project Case studies are an important part of project management education and training. This Fourth Edition of Harold Kerzner''s Project Management Case Studies features a number of new cases covering value measurement in project management. Also included is the well-received ""super case,"" which covers all aspects of project management and may be used as a capstone for a course. This new edition:Contains 100-plus case studies drawn from re

  17. The USE Project

    DEFF Research Database (Denmark)

    Frøkjær, E.; Hornbæk, K.; Høegh, Rune Thaarup

    2006-01-01

    This paper provides experience from activities in the USE project. The USE project is a research project that aims at bridging the gap between usability evaluation and user interface design. It is conducted from 2005 to 2008 in collaboration between researchers from Aalborg University and Copenha......This paper provides experience from activities in the USE project. The USE project is a research project that aims at bridging the gap between usability evaluation and user interface design. It is conducted from 2005 to 2008 in collaboration between researchers from Aalborg University...... and Copenhagen University, and developers and managers working in software development organizations....

  18. IT Project Selection

    DEFF Research Database (Denmark)

    Pedersen, Keld

    2016-01-01

    for initiation. Most of the research on project selection is normative, suggesting new methods, but available empirical studies indicate that many methods are seldom used in practice. This paper addresses the issue by providing increased understanding of IT project selection practice, thereby facilitating...... the development of methods that better fit current practice. The study is based on naturalistic decision-making theory and interviews with experienced project portfolio managers who, when selecting projects, primarily rely on political skills, experience and personal networks rather than on formal IT project......-selection methods, and these findings point to new areas for developing new methodological support for IT project selection....

  19. One project's waste is another project's resource

    International Nuclear Information System (INIS)

    Short, J.

    1997-01-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables

  20. Integrated project support environments the ASPECT project

    CERN Document Server

    Brown, Alan W

    1991-01-01

    A major part of software engineering developments involve the use of computing tools which facilitate the management, maintenance, security, and building of long-scale software engineer projects. Consequently, there have been a proliferation of CASE tools and IPSES. This book looks at IPSES in general and the ASPECT project in particular, providing design and implementation details, as well as locating ASPECT in IPSE developments.Survey of integrated project support environments for more efficient software engineering**Description of a large scale IPSE--ASPECT**Evaluation of formal methods in

  1. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  2. Construction project management handbook.

    Science.gov (United States)

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  3. BioProject

    Data.gov (United States)

    U.S. Department of Health & Human Services — The BioProject database provides an organizational framework to access information about research projects with links to data that have been or will be deposited...

  4. The Phebus FP project

    International Nuclear Information System (INIS)

    Delchambre, P.; Von der Hardt, P.

    1989-01-01

    This report summarizes the pre-project studies concerning the PHEBUS FP facility. After recalling the programme objectives, it describes the projected modifications to the PHEBUS reactor, outlines new installations and justifies the selected options

  5. Number projection method

    International Nuclear Information System (INIS)

    Kaneko, K.

    1987-01-01

    A relationship between the number projection and the shell model methods is investigated in the case of a single-j shell. We can find a one-to-one correspondence between the number projected and the shell model states

  6. Successful project management

    CERN Document Server

    Young, Trevor L

    2016-01-01

    Successful Project Management, 5th edition, is an essential guide for anyone who wants to improve the success rate of their projects. It will help managers to maintain a balance between the demands of the customer, the project, the team and the organization. Covering the more technical aspects of a project from start to completion it contains practised and tested techniques, covering project conception and start-up, how to manage stake holders, effective risk management, project planning and launch and execution. Also including a brand new glossary of key terms, it provides help with evaluating your project as well as practical checklists and templates to ensure success for any ambitious project manager. With over one million copies sold, the hugely popular Creating Success series covers a wide variety of topic, with the latest editions including new chapters such as Tough Conversations and Treating People Right. This indispensable business skills collection is suited to a variety of roles, from someone look...

  7. Unicycle Project Report

    OpenAIRE

    Thomson, S

    2010-01-01

    The Unicycle project implemented an institutional Open Educational Resource repository with a view to ensuring sustainability in approach by embedding OER as an Assessment, Learning and Teaching strategy. This is the final submitted report for the project.

  8. Collaborative Contracting in Projects

    NARCIS (Netherlands)

    Suprapto, M.

    2016-01-01

    Project practitioners have increasingly recognized the importance of collaborative relationships to ensure successful executions of projects. However, the ability to sustain and consistenly drive real collaborative attitudes and behavior for achieving the desired outcomes remains of enduring

  9. Project Tasks in Robotics

    DEFF Research Database (Denmark)

    Sørensen, Torben; Hansen, Poul Erik

    1998-01-01

    Description of the compulsary project tasks to be carried out as a part of DTU course 72238 Robotics......Description of the compulsary project tasks to be carried out as a part of DTU course 72238 Robotics...

  10. Venezuela's Bolivarian Schools Project.

    Science.gov (United States)

    Diaz, Maria Magnolia Santamaria

    2002-01-01

    Discusses efforts by the Venezuelan government to improve the nation's school infrastructure through the Bolivarian Schools Project administered by the Ministry of Education, Culture and Sport. The project set educational principles which are guiding current school building efforts. (EV)

  11. Project management process.

    Science.gov (United States)

    2007-03-01

    This course provides INDOT staff with foundational knowledge and skills in project management principles and methodologies. INDOTs project management processes provide the tools for interdisciplinary teams to efficiently and effectively deliver pr...

  12. The Alzheimer's Project

    Science.gov (United States)

    ... Navigation Bar Home Current Issue Past Issues The Alzheimer's Project Past Issues / Spring 2009 Table of Contents ... of this page please turn Javascript on. The Alzheimer's Project A 4-Part Documentary Series Starting May ...

  13. Capital Projects Application (CPA)

    Data.gov (United States)

    General Services Administration — Capital Projects application (CPA) provides users with the ability to maintain project related financial data for Budget Activity (BA) 51, 55, 64, 01, 02, 03, 04....

  14. Earned value project management

    CERN Document Server

    Fleming, Quentin W

    2010-01-01

    Organizations that follow the principles of good Earned Value Management (EVM) create an environment that allows teams to successfully operate and thrive ? even in the face of challenges that could negatively impact their projects. Earned Value Project Management (EVPM) is a methodology used to measure and communicate the real physical progress of a project taking into account the work completed, the time taken and the costs incurred to complete that work. As a result, EVPM allows more educated and effective management decision-making, which helps evaluate and control project risk by measuring project progress in monetary terms. In the first two editions of Earned Value Project Management, Quentin W. Fleming and Joel M. Koppelman provided guidance for project management practitioners already familiar with EVPM, was well as those who were new to the use of this technique. The third edition expanded the information available on of EVPM for medium and smaller projects while still being relevant for larger projec...

  15. Health Complaints Associated with Poor Rental Housing Conditions in Arkansas: The Only State without a Landlord’s Implied Warranty of Habitability

    Science.gov (United States)

    Bachelder, Ashley E.; Stewart, M. Kate; Felix, Holly C.; Sealy, Neil

    2016-01-01

    Arkansas is the only U.S. state that does not have a landlord’s implied warranty of habitability, meaning tenants have a requirement for maintaining their rental properties at certain habitability standards, but landlords are not legally required to contribute to those minimum health and safety standards. This project assessed the possibility that this lack of landlord responsibility affects tenants’ perceived health. Using surveys and interviews, we collected self-reported data on the prevalence and description of problems faced by renters who needed household repairs from their landlords. Of almost 1,000 renters, one-third of them had experienced a problem with their landlord making needed repairs; and one-quarter of those had a health issue they attributed to their housing conditions. Common issues included problems with plumbing, heating, or cooling systems, and pest or rodent control. Reported health problems included elevated stress levels, breathing problems, headaches, high blood pressure, and bites or infections. Hispanic respondents and those with less than a high school education were both significantly more likely to report problems with their landlords not making repairs as requested. These data suggest that the lack of landlord requirements may negatively impact the condition of rental properties and, therefore, may negatively impact the health of Arkansas renters. PMID:27933288

  16. Health Complaints Associated with Poor Rental Housing Conditions in Arkansas: The Only State Without a Landlord’s Implied Warranty of Habitability

    Directory of Open Access Journals (Sweden)

    Ashley Bachelder

    2016-11-01

    Full Text Available Arkansas is the only U.S. state that does not have a landlord’s implied warranty of habitability, meaning tenants have a requirement for maintaining their rental properties at certain habitability standards, but landlords are not legally required to contribute to those minimum health and safety standards. This project assessed the possibility that this lack of landlord responsibility affects tenants’ perceived health. Using surveys and interviews, we collected self-reported data on the prevalence and description of problems faced by renters who needed household repairs from their landlords. Of almost 1000 renters, one third of them had experienced a problem with their landlord making needed repairs; and one-quarter of those had a health issue they attributed to their housing conditions. Common issues included problems with plumbing, heating or cooling systems, and pest or rodent control. Reported health problems included elevated stress levels, breathing problems, headaches, high blood pressure and bites or infections. Hispanic respondents and those with less than a high school education were both significantly more likely to report problems with their landlords not making repairs as requested. The data suggest that the lack of landlord requirements may negatively impact the condition of rental properties, and therefore may negatively impact the health of Arkansas renters.

  17. Benefits of fish passage and protection measures at hydroelectric projects

    International Nuclear Information System (INIS)

    Cada, G.F.; Jones, D.W.

    1993-01-01

    The US Department of Energy's Hydropower Program is engaged in a multi-year study of the costs and benefits of environmental mitigation measures at nonfederal hydroelectric power plants. An initial report (Volume 1) reviewed and surveyed the status of mitigation methods for fish passage, instream flows, and water quality; this paper focuses on the fish passage/protection aspects of the study. Fish ladders were found to be the most common means of passing fish upstream; elevators/lifts were less common, but their use appears to be increasing. A variety of mitigative measures is employed to prevent fish from being drawn into turbine intakes, including spill flows, narrow-mesh intake screens, angled bar racks, and lightor sound-based guidance measures. Performance monitoring and detailed, quantifiable performance criteria were frequently lacking at non-federal hydroelectric projects. Volume 2 considers the benefits and costs of fish passage and protection measures, as illustrated by case studies for which performance monitoring has been conducted. The report estimates the effectiveness of particular measures, the consequent impacts on the fish populations that are being maintained or restored, and the resulting use and non-use values of the maintained or restored fish populations

  18. IX Disposition Project - project management plan

    International Nuclear Information System (INIS)

    Choi, I.G.

    1994-01-01

    This report presents plans for resolving saving and disposal concerns for ion exchange modules, cartridge filters and columns. This plan also documents the project baselines for schedules, cost, and technical information

  19. Project Management Performance Drivers

    OpenAIRE

    Ra’ad, Mohammed A.; Najdawi, Mohammad K.

    2010-01-01

    The practice of project management has gained enormous importance over the past several years in various business industries. “In industries as diverse as pharmaceuticals, software, and aerospace, projects drive business” (Wheatley). This gain of importance can be attributed to the magnitude of the impact project performance results in terms of time, cost, and scope have over the project performing entity. “On the basis of data released by the Bureau of Economic Analysis, part of the US De...

  20. Managing clinical improvement projects.

    Science.gov (United States)

    Phillips, Joanna; Simmonds, Lorraine

    This paper, the second of a three-part series looking at change management tools, provides a practical guide on how to use common project management principles in practice. Much of the literature on project management focuses on the business arena, with little reference to clinical settings. Identifying this literature and understanding its relevance to managing projects in healthcare can be difficult. This article provides a practical guide to identifying the key principles of good project management and applying these in health settings.

  1. The Dwarf Project: Vidojevica

    Science.gov (United States)

    Vince, O.

    2013-05-01

    The DWARF project is an important international project for observing eclipsing binary stars and searching for third companion which orbit around both stars. Recently, a group of researchers at the Astronomical Observatory of Belgrade joined this project using the 60 cm telescope at the Astronomical Station Vidojevica for observations. All the equipment and the human potential involved with this project from Serbia will be described in this paper.

  2. Project Management Techniques

    OpenAIRE

    Mihalache Anita; Salagean Liana

    2010-01-01

    Project management is a technique that can aid in the planning, scheduling, and monitoring of complex projects characterized by numerous, non repetitive jobs called activities. Examples of projects that would use project management include: - developing a mass rapid – transit system for a metropolitan area; - organizing the relocation of a corporate headquarters; - planning the production of a concert, film, or play; - developing and marketing a new automobile; - constructing a high – rise of...

  3. Project evaluation: main characteristics

    OpenAIRE

    Moutinho, Nuno

    2010-01-01

    — The evaluation process of real investment projects must consider not only the traditional financial approach, but also non-financial aspects. Non financial analysis can provide additional relevant information about projects. We investigate financial and non-financial areas most relevant in project appraisal. We present main critical success factors and areas of analysis that lead to the perception of project success. Finally, companies are segmented to verify its financial and non-financial...

  4. Project mechanisms challenges

    International Nuclear Information System (INIS)

    Perthuis, Ch. de

    2005-06-01

    The project mechanism complete the quotas systems concerning the carbon dioxide emissions market. The author explains and discusses these mechanisms and provides a panorama of the existing and developing projects. More specially she brings information on the mechanism of clean developments and renewable energies, the coordinated mechanisms, the agricultural projects, the financing of the projects and the exchange systeme of the New south Wales. (A.L.B.)

  5. ORGANIZATIONAL PROJECT MANAGEMENT MATURITY

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2017-11-01

    Full Text Available The present article is aimed at developing a set of recommendations for achieving a higher level of organizational project maturity at a given enterprise. Methodology. For the purposes of the current research, the available information sources on the components of project management system are analysed; the essence of “organizational maturity” and the existing models of organizational maturity are studied. The method of systemic and structural analysis, as well as the method of logical generalization, are employed in order to study the existing models of organizational maturity, to describe levels of organizational maturity, and finally to develop a set of methodological recommendations for achieving a higher level of organizational project maturity at a given enterprise. The results of the research showed that the core elements of project management system are methodological, organizational, programtechnical, and motivational components. Project management encompasses a wide range of issues connected with organizational structure, project team, communication management, project participants, etc. However, the fundamental basis for developing project management concept within a given enterprise starts with defining its level of organizational maturity. The present paper describes various models of organizational maturity (staged, continuous, petal-shaped and their common types (H. Кеrzner Organizational Maturity Model, Berkeley PM Maturity Model, Organizational Project Management Maturity Model, Portfolio, Program & Project Management Maturity Model. The analysis of available theoretic works showed that the notion “organizational project maturity” refers to the capability of an enterprise to select projects and manage them with the intention of achieving its strategic goals in the most effective way. Importantly, the level of maturity can be improved by means of formalizing the acquired knowledge, regulating project-related activities

  6. Pilot Project: analysis, development and projection

    OpenAIRE

    Tapia Abril, Verónica Emilia; Chérrez Rodas, Karina; García Pesántez, Gabriela Rosana; Maldonado Marchán, María Elisa; Bustamante Montesdeoca, José Luis

    2014-01-01

    Since the introduction of ICT in architecture and teaching, pedagogies of education have faced their learning paradigms change. Institutes of higher education have folded to this motion and have undergone a process of change by implementing multimedia elements in their subjects. Through the pilot project educational videos that aim to meet the highest standards of educational videos described by Van Dam have been developed. The project expects to generate educational videos for different depa...

  7. Building Project Competence

    DEFF Research Database (Denmark)

    Pemsel, Sofia; Wiewiora, Anna

    This research investigates the development of project competence, and particularly, three related dynamic capabilities (shifting, adapting, leveraging) that contribute to project competence development. In doing so, we make use of the emerging literature on knowledge governance and theorize how...... of dynamic capability building promoting project competence development....

  8. The Llama Project.

    Science.gov (United States)

    Ganzel, Candy; Stuglik, Jan

    2003-01-01

    At a suburban Indiana elementary school, the Project Approach serves as the basis of the curriculum in all Kindergarten classrooms. The four classes of 5- and 6-year-old children at this school chose to study llamas. This article discusses how the project evolved, describes the three phases of the project, and provides teachers' reflections on the…

  9. Nuclear safety projects 1995

    International Nuclear Information System (INIS)

    Carl-Erik Christoffersen

    1996-01-01

    Action plans for the prevention of contamination in the Arctic regions is concretized in a number of international projects. The Norwegian Radiation Protection Authority is responsible for the follow-up of 13 projects. The report describes the development of these projects in 1995

  10. Projection: A Bibliography.

    Science.gov (United States)

    Pedrini, D. T.; Pedrini, Bonnie C.

    Sigmund Freud and his associates did much clinical work with the dynamic of projection, especially with regard to paranoid symptoms and syndromes. Much experimental work has also been done with projection. Sears evaluated the results of some of those studies. Murstein and Pryer sub-classified projection and reviewed typical studies. The…

  11. Mayan Forest Road Projects

    DEFF Research Database (Denmark)

    Conde, Dalia Amor

    2008-01-01

    Road-building projects in the Mayan Biosphere Reserve to connect Mexico and Guatemala were subjected to a cost-benefit evaluation. Up to an estimated 311,000 hectares of jaguar habitat were found to be at risk of deforestation due to these projects. Some of the projects were shown to have negativ...... of continued conservation rather than road development....

  12. Projection Models 2010

    DEFF Research Database (Denmark)

    Illerup, J. B.; Birr-Pedersen, K.; Mikkelsen, M. H

    Models for projection of SO2-, NOx-, NMVOC- and NH3-emissions to the atmosphere have been developed and the Danish emissions have been projected until 2010 from a basis scenario including all implemented and planned measures. The projections of the four pollutants indicate that it may be difficult...

  13. Project Communications Management

    OpenAIRE

    José C. Santiago-Guevara; Mauricio Rojas-Contreras; Luis A. Esteban-Villamizar

    2013-01-01

    This article presents a review in relation to the object of study: Communications Management as an important factor in the management of projects. The review includes the most relevant and most renowned authors in the field of project management, focusing on telecommunications projects, which lets you define a communications management model.

  14. Designing Project Management

    NARCIS (Netherlands)

    Heintz, John Linke; Lousberg, L.; Wamelink, J.W.F.; Saari, A.; Huovinen, P.

    2016-01-01

    In this paper we introduce the concept of Designing Project Management. On the basis of our earlier work, we suggest that there is still a gap between what is known from recent project management literature and what project managers can structurally help in the effectiveness of their work. Assuming

  15. Humane Education Projects Handbook.

    Science.gov (United States)

    Junior League of Ogden, UT.

    This handbook was developed to promote interest in humane education and to encourage the adoption of humane education projects. Although specifically designed to assist Junior Leagues in developing such projects, the content should prove valuable to animal welfare organizations, zoos, aquariums, nature centers, and other project-oriented groups…

  16. MRS project management

    International Nuclear Information System (INIS)

    Doman, J.W.; Vlahakis, J.

    1992-01-01

    Management of projects under the control of the Office of Civilian Radioactive Waste Management within the Department of Energy is subject to overview by a variety of internal and external entities. This paper reports that effective project management often requires balancing of conflicting directions and conflicting agendas of the different entities in order to proceed with implementation of the Monitored Retrievable Storage project

  17. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  18. Project report - an overview of the project and experiences with project management

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Mikkelsen, Bent Egberg

    1996-01-01

    A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project.......A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project....

  19. Underestimation of Project Costs

    Science.gov (United States)

    Jones, Harry W.

    2015-01-01

    Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

  20. Fundamentals of Project Management

    CERN Document Server

    Heagney, Joseph

    2011-01-01

    With sales of more than 160,000 copies, Fundamentals of Project Management has helped generations of project managers navigate the ins and outs of every aspect of this complex discipline. Using a simple step-by-step approach, the book is the perfect introduction to project management tools, techniques, and concepts. Readers will learn how to: ò Develop a mission statement, vision, goals, and objectives ò Plan the project ò Create the work breakdown structure ò Produce a workable schedule ò Understand earned value analysis ò Manage a project team ò Control and evaluate progress at every stage.

  1. Visualizations as Projection Devices

    DEFF Research Database (Denmark)

    Harty, Chris; Holm Jacobsen, Peter; Tryggestad, Kjell

    The aim of this paper is to inquire into the role of project visualizations in shaping healthcare spaces and practices. The study draws upon an ethnographic field study from a large on-going hospital construction project in Denmark, and focuses on the early phases of on-boarding the design team...... into the project organization. During the on-boarding visualizations multiplies in form, content and purpose, ranging from paper and digitally based projections of clinical work spaces and practices for the future hospital building in use, to paper and digitally based projections of the cost budget and time...

  2. Managing Projects with KPRO

    Science.gov (United States)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  3. Project Decision Chain

    DEFF Research Database (Denmark)

    Rolstadås, Asbjørn; Pinto, Jeffrey K.; Falster, Peter

    2015-01-01

    To add value to project performance and help obtain project success, a new framework for decision making in projects is defined. It introduces the project decision chain inspired by the supply chain thinking in the manufacturing sector and uses three types of decisions: authorization, selection......, and plan decision. A primitive decision element is defined where all the three decision types can be accommodated. Each task in the primitive element can in itself contain subtasks that in turn will comprise new primitive elements. The primitive elements are nested together in a project decision chain....

  4. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  5. Managing Distributed Software Projects

    DEFF Research Database (Denmark)

    Persson, John Stouby

    Increasingly, software projects are becoming geographically distributed, with limited face-toface interaction between participants. These projects face particular challenges that need careful managerial attention. This PhD study reports on how we can understand and support the management...... of distributed software projects, based on a literature study and a case study. The main emphasis of the literature study was on how to support the management of distributed software projects, but also contributed to an understanding of these projects. The main emphasis of the case study was on how to understand...... the management of distributed software projects, but also contributed to supporting the management of these projects. The literature study integrates what we know about risks and risk-resolution techniques, into a framework for managing risks in distributed contexts. This framework was developed iteratively...

  6. ASEAN projects reviewed.

    Science.gov (United States)

    1980-01-01

    The ASEAN Population Expert Group met in Manila and was followed by a meeting of the ASEAN heads of population programs, during the period November 5-10, 1979. Heads of population programs from Indonesia, Malaysia, Singapore, Thailand, and the Philippines attended. The meetings were held to review progress-to-date on phase 1 projects and to consider the development of an expanded population program. 5 projects funded by UNFPA are reviewed in tabular form with the project, the sponsoring country, date of implementation, data analysis, and date of completion. Suggestions were made for improving and extending these projects and it was also suggested that all projects being developed and proposed should include a section on use of research. 7 new projects were proposed as phase 2 projects. The 1st, sponsored by Malaysia, deals with women in development; project 2, lead by Thailand, will investigate population movement and its effect on development; project 3, led by the Philippines, will develop and strengthen national population information systems and networks in ASEAN countries; project 4, led by Indonesia, is directed towards institutional development and exchanges of personnel; project 5, led by the Philippines, will examine population and development dynamics and the man/resources balance; project 6, led by Thailand, will develop ASEAN social indicators; and project 7, led by Indonesia and Malaysia, will make a comprehensive analysis of existing medical/health care and family planning systems. It was recommended that an executive director of the proposed ASEAN population coordination unit should be appointed to expedite the recommendations of the meeting related to preparation and submission of phase 2 project proposals.

  7. Australian Modernists in London: William Dobell’s The Dead Landlord and Patrick White’s The Ham Funeral

    Directory of Open Access Journals (Sweden)

    Denise Varney

    2016-09-01

    Full Text Available When Patrick White was awarded the Nobel Prize for Literature in 1973, it was primarily for his novels. Less well recognised is the significance of White’s dramatic literature and his involvement in the theatre. This article offers a new analysis of White’s first notable breakthrough into theatre and drama, The Ham Funeral, which he wrote in postwar London and which was produced in Adelaide in 1961. This article argues that a modernist idiom of 20th-century Australian drama can be found in this play that laid the groundwork for a poetics of language, image and theatricality. The play’s aesthetic modernism is found primarily in the blend of expressionist and surrealist elements, the poetic language, the alienated creative subject and the representation of sexuality and the unconscious. White’s thematics also become political, concerned with power, masculinity and gendered assumptions about rationality and emotion, poetry and the body. Having lived in London during the interwar years, White was also part of the networks that included Australian-born artists, and he was exposed to influences from visual arts as well as theatre. Of these, the artist William Dobell was central to the genesis of The Ham Funeral, as was the Polish-born modernist artist S. Ostoja-Kotkowski, who was critical to the design of the brooding expressionist set that set the standard for subsequent stage realisations of the play.

  8. Perspectives on projects, project success and team work

    OpenAIRE

    Thompson, Karen

    2015-01-01

    This paper brings together perspectives on projects, project success and team work as a background to two graphical tools for considering project success and individual capabilities for working in a project team.

  9. Quality Assurance Project Plan for Citizen Science Projects

    Science.gov (United States)

    The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.

  10. Project Management and the Project Manager: A Strategy for ...

    African Journals Online (AJOL)

    International Journal of Development and Management Review ... collapse, project failure, project abandonment, project cost and time overruns, etc. ... component parts that constitute project management in the building construction industry.

  11. Theory of Abelian projection

    International Nuclear Information System (INIS)

    Ogilvie, M.C.

    1999-01-01

    Analytic methods for Abelian projection are developed. A number of results are obtained related to string tension measurements. It is proven that even without gauge fixing, Abelian projection yields string tensions of the underlying non-Abelian theory. Strong arguments are given for similar results in the case where gauge fixing is employed. The methods used emphasize that the projected theory is derived from the underlying non-Abelian theory rather than vice versa. In general, the choice of subgroup used for projection is not very important, and need not be Abelian. While gauge fixing is shown to be in principle unnecessary for the success of Abelian projection, it is computationally advantageous for the same reasons that improved operators, e.g., the use of fat links, are advantageous in Wilson loop measurements. Two other issues, Casimir scaling and the conflict between projection and critical universality, are also discussed. copyright 1999 The American Physical Society

  12. Battleground Energy Recovery Project

    Energy Technology Data Exchange (ETDEWEB)

    Bullock, Daniel [USDOE Gulf Coast Clean Energy Application Center, Woodlands, TX (United States)

    2011-12-31

    In October 2009, the project partners began a 36-month effort to develop an innovative, commercial-scale demonstration project incorporating state-of-the-art waste heat recovery technology at Clean Harbors, Inc., a large hazardous waste incinerator site located in Deer Park, Texas. With financial support provided by the U.S. Department of Energy, the Battleground Energy Recovery Project was launched to advance waste heat recovery solutions into the hazardous waste incineration market, an area that has seen little adoption of heat recovery in the United States. The goal of the project was to accelerate the use of energy-efficient, waste heat recovery technology as an alternative means to produce steam for industrial processes. The project had three main engineering and business objectives: Prove Feasibility of Waste Heat Recovery Technology at a Hazardous Waste Incinerator Complex; Provide Low-cost Steam to a Major Polypropylene Plant Using Waste Heat; and Create a Showcase Waste Heat Recovery Demonstration Project.

  13. J-PARC project

    International Nuclear Information System (INIS)

    Nagamiya, Shoji

    2004-01-01

    From Japanese fiscal year JFY01, which started on April 1, 2001, a new accelerator project to provide high-intensity proton beams proceeded into its construction phase. This project, which is now called the Japan Proton Accelerator Research Complex (J-PARC) project, is conducted under a cooperation of two institutions, KEK and Japan Atomic Energy Research Institution. We set a goal to achieve 1 MW proton beams at 3 GeV and 0.75 MW beams at 50 GeV. The project will be completed within six years, with the anticipated first beams in the spring of 2007. In this article I will describe (a) the project itself, (b) sciences to be pursued at this new accelerator complex and (c) the present status and future plans of the project

  14. Photovoltaic demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Kaut, W [Commission of the European Communities, Brussels (Belgium); Gillett, W B; Hacker, R J [Halcrow Gilbert Associates Ltd., Swindon (GB)

    1992-12-31

    This publication, comprising the proceedings of the fifth contractor`s meeting organized by the Commission of the European Communities, Directorate-General for Energy, provides an overview of the photovoltaic demonstration projects which have been supported in the framework of the energy demonstration programme since 1983. It includes reports by each of the contractors who submitted proposals in 1987 and 1988, describing progress within their projects. Projects accepted from earlier calls for proposals and not yet completed were reviewed by a rapporteur and are discussed in the summary section. The results of the performance monitoring of all projects and the lessons drawn from the practical experience of the projects are also presented in the summaries and conclusions. Contractors whose projects were submitted in 1989 were also present at the meeting and contributed to the reported discussions. This proceeding is divided into four sessions (General, Housing, technical presentations, other applications) and 24 papers are offered.

  15. AAEC nuclear power projections

    International Nuclear Information System (INIS)

    Khoe, G.; Fredsall, J.; Scurr, I.; Plotnikoff, W.

    1981-01-01

    The nuclear power capacity projections developed in the May-June period of 1981 by the AAEC are presented. There have been downward revisions for nearly all countries with centrally planned economies. Projections for the year 2000 for the Western World have decreased in aggregate by 4.7% (27Gw) compared to those of 1980. However, this reduction is less than the previous estimate reduction and there appears to have been a stabilisation in the projection

  16. What is project finance?

    OpenAIRE

    João M. Pinto

    2017-01-01

    Project finance is the process of financing a specific economic unit that the sponsors create, in which creditors share much of the venture’s business risk and funding is obtained strictly for the project itself. Project finance creates value by reducing the costs of funding, maintaining the sponsors financial flexibility, increasing the leverage ratios, avoiding contamination risk, reducing corporate taxes, improving risk management, and reducing the costs associated with market ...

  17. Computer Assets Recovery Project

    Science.gov (United States)

    CortesPena, Aida Yoguely

    2010-01-01

    This document reports on the project that was performed during the internship of the author. The project involved locating and recovering machines in various locations that Boeing has no need for, and therefore requires that they be transferred to another user or transferred to a non-profit organization. Other projects that the author performed was an inventory of toner and printers, loading new computers and connecting them to the network.

  18. Operational Waste Volume Projection

    Energy Technology Data Exchange (ETDEWEB)

    STRODE, J.N.

    2000-08-28

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

  19. Organization of project management

    International Nuclear Information System (INIS)

    Schmidt, R.

    1975-01-01

    When speaking about interfaces within a project and their management, one has to understand and define what an interface is. In general, each component facing another one and each person working on a project with another person represents an interface. Therefore a project will consist practically in its entirety of interfaces with components and people sandwiched between them. This paper is limited to the most important interfaces with a focus on the problems occuring at them and their resolution. (orig.) [de

  20. Operational waste volume projection

    International Nuclear Information System (INIS)

    Koreski, G.M.; Strode, J.N.

    1995-06-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the tri-party agreement. Assumptions are current as of June 1995

  1. PPP projects in transport

    DEFF Research Database (Denmark)

    Petersen, Ole Helby; Carpintero, Samuel

    2014-01-01

    Public–private partnerships (PPPs) have been extensively used in Spain for the procurement of light rail systems. This paper analyses five projects that have been in operation for more than five years. The authors examine the reasoning behind the selection of the PPP projects, risk......-sharing mechanisms, competition among private providers, and overall cost-effectiveness. The paper demonstrates a need for more rigorous assessments of the merits of PPP projects before they are initiated....

  2. Operational Waste Volume Projection

    International Nuclear Information System (INIS)

    STRODE, J.N.

    2000-01-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000

  3. Existence of Projective Planes

    OpenAIRE

    Perrott, Xander

    2016-01-01

    This report gives an overview of the history of finite projective planes and their properties before going on to outline the proof that no projective plane of order 10 exists. The report also investigates the search carried out by MacWilliams, Sloane and Thompson in 1970 [12] and confirms their result by providing independent verification that there is no vector of weight 15 in the code generated by the projective plane of order 10.

  4. Microwave solidification project overview

    Energy Technology Data Exchange (ETDEWEB)

    Sprenger, G.

    1993-01-01

    The Rocky Flats Plant Microwave Solidification Project has application potential to the Mixed Waste Treatment Project and the The Mixed Waste Integrated Program. The technical areas being addressed include (1) waste destruction and stabilization; (2) final waste form; and (3) front-end waste handling and feed preparation. This document covers need for such a program; technology description; significance; regulatory requirements; and accomplishments to date. A list of significant reports published under this project is included.

  5. Oskarshamn 1-project FENIX

    International Nuclear Information System (INIS)

    Sjoeqvist, N.G.

    1994-01-01

    This paper summarizes the actions to be taken in a large re-start and backfitting project such as the Fenix project. It describes the organization, planning and financial management, safety criteria and licensing procedures, safety concept report, health and safety. The results from the unique full system decontamination of the reactor pressure vessel is described. The project is still ongoing and therefore other results and lessons learnt are not reported. (author) 9 figs

  6. Microwave solidification project overview

    International Nuclear Information System (INIS)

    Sprenger, G.

    1993-01-01

    The Rocky Flats Plant Microwave Solidification Project has application potential to the Mixed Waste Treatment Project and the The Mixed Waste Integrated Program. The technical areas being addressed include (1) waste destruction and stabilization; (2) final waste form; and (3) front-end waste handling and feed preparation. This document covers need for such a program; technology description; significance; regulatory requirements; and accomplishments to date. A list of significant reports published under this project is included

  7. Embedded Linux projects using Yocto project cookbook

    CERN Document Server

    González, Alex

    2015-01-01

    If you are an embedded developer learning about embedded Linux with some experience with the Yocto project, this book is the ideal way to become proficient and broaden your knowledge with examples that are immediately applicable to your embedded developments. Experienced embedded Yocto developers will find new insight into working methodologies and ARM specific development competence.

  8. Project Risk Management

    Science.gov (United States)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  9. HERMES project management I

    CERN Multimedia

    CERN. Geneva

    2013-01-01

    A two-hours course on the HERMES Project Management Methodology to the attention of Project Leaders and Project Participants. The methodology is quickly presented; the focus is put on the roles and responsibilities and on the project initiation phase. The course is given in French with slides in English. On April 22nd 2013, a new version of the HERMES methodology was made public. For practical reasons, this course is still given based on the 2009 version of HERMES (a.k.a. HERMES 4).

  10. Scrum Project Management

    CERN Document Server

    Pries, Kim H

    2010-01-01

    Scrum, which was originally invented solely for software development, can now be applied to all types of projects. This book shows project managers how to implement Scrum by explaining the artifacts, rituals, and roles used. The text provides Scrum planning methods to control project scope and schedule as well as Scrum tracking methods to focus teams on improving throughput and streamlining communications. The authors show how to combine traditional project methods with Scrum and how to adapt the familiar work breakdown structure to create Scrum backlogs and sprints. They also demonstrate how

  11. Severe fuel damage projects

    International Nuclear Information System (INIS)

    Sdouz, G.

    1987-10-01

    After the descriptions of the generation of a Severe Fuel Damage Accident in a LWR the hypothetical course of such an accident is explained. Then the most significant projects are described. At each project the experimental facility, the most important results and the concluding models and codes are discussed. The selection of the projects is concentrated on the German Projekt Nukleare Sicherheit (PNS), tests performed at the Idaho National Engineering Laboratory (INEL) and smaller projects in France and Great Britain. 25 refs., 26 figs. (Author)

  12. Assessment of Students Projects

    DEFF Research Database (Denmark)

    Kofoed, Lise B.; Stachowicz, Marian S.

    2012-01-01

    The evaluation and assessment of engineering programmes is a big issue, and there exist many concepts and methods. This paper deals with the assessment methods which can be used when assessing the knowledge, skills and competences developed in projects using PBL (problem based and project organized...... learning) pedagogical approaches. The experience of assessing first year projects from the Medialogy education at Aalborg University and third year projects from the Electrical and Computer Engineering Department at University of Minnesota, Duluth are presented, and the different methods discussed....... The conclusion is that process as well as product has to be assessed in a way which evaluates all aspects of students’ learning outcomes....

  13. The HGF strategy project

    International Nuclear Information System (INIS)

    Knebel, J.U.; Fellmoser, F.; Lefhalm, C.; Mack, K.; Pettan, C.; Piecha, H.; Konys, J.; Adelhelm, C.; Glasbrenner, H.; Muscher, H.; Novotny, J.; Voss, Z.; Wedemeyer, O.; Mueller, G.; Heinzel, A.; Schumacher, G.; Huber, R.; Zimmermann, F.; Groetzbach, G.; Dorr, B.; Carteciano, L.N.

    2000-01-01

    Within the Hermann von Helmholtz-Gemeinschaft Deutscher Forschungszentren (HGF) an HGF-Strategy Fund Project entitled 'Innovative Technologies to Reduce Radiotoxicity' is funded since October 1999. The objectives of this HGF-Strategy Fund Project is the development of new methods and technologies to design and manufacture thin-walled and highly thermally-loaded surfaces which are cooled by a corrosive heavy liquid metal (lead-bismuth eutectic). The result of this project will be the basic scientific-technical tool which allows the conception and the design of a European Demonstrator of an ADS system (cf. 32.23.05). The work performed at Forschungszentrum Karlsruhe is embedded in a broad European research and development programme on ADS systems. The project is divided in three sub-projects: Sub-Project 1: Thermalhydraulic Investigations, Sub-Project 2: Material Specific Investigations, Sub-Project 3: Oxygen Control System. This progress report gives a general description of the project and its envisaged objectives. As a selection of the results achieved, first, FLUTAN calculations for the COULI beam window design and, second, the oxygen control system for the KArlsruhe Lead LAboratory KALLA are described in detail. Finally, the design and status of KALLA is given. (orig.)

  14. Environmental Science: 49 Science Fair Projects. Science Fair Projects Series.

    Science.gov (United States)

    Bonnet, Robert L.; Keen, G. Daniel

    This book contains 49 science fair projects designed for 6th to 9th grade students. Projects are organized by the topics of soil, ecology (projects in habitat and life cycles), pests and controls (projects in weeds and insects), recycling (projects in resources and conservation), waste products (projects in decomposition), microscopic organisms,…

  15. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  16. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  17. Sustainable Energy (SUSEN) project

    International Nuclear Information System (INIS)

    Richter, Jiri

    2012-01-01

    Research Centre Rez and University of West Bohemia started preparatory work on the 'Sustainable Energy' project, financed from EU structural funds. The goals and expected results of the project, its organization, estimated costs, time schedule and current status are described. (orig.)

  18. Managing Stress. Project Seed.

    Science.gov (United States)

    Muto, Donna; Wilk, Jan

    One of eight papers from Project Seed, this paper describes a stress management project undertaken with high school sophomores. Managing Stress is described as an interactive workshop that offers young people an opportunity to examine specific areas of stress in their lives and to learn effective ways to deal with them. The program described…

  19. The Cool Colors Project

    Science.gov (United States)

    Gov. Arnold Schwarzenegger, second from left, a sample from the Cool Colors Project, a roof product ) (Jeff Chiu - AP) more Cool Colors make the front page of The Sacramento Bee (3rd highest circulation newspaper in California) on 14 August 2006! Read the article online or as a PDF. The Cool Colors Project

  20. Lower Churchill project

    Energy Technology Data Exchange (ETDEWEB)

    Gilbert, B. [Nalcor Energy, St. John' s, Newfoundland (Canada)

    2011-07-01

    This paper discusses the Lower Churchill Hydroelectric Generation Project in Newfoundland Labrador. The project is of national interest as it creates jobs and benefits across Canada. It provides inter provincial electricity grid integration, provides significant contribution to lower emissions and enables development of other renewable generation.

  1. Poverty alleviation project review

    CSIR Research Space (South Africa)

    Braun, AL

    2003-01-01

    Full Text Available seven pure cashmere rams from project. EC (Emerging farmers) farmers have also received 43 upgraded cashmere rams from Dept. of Agric. EC From the plus minus 1800 goats involved in the project at least 450 kids / offspring of the improved goats have been...

  2. Conservation Science Fair Projects.

    Science.gov (United States)

    Soil Conservation Society of America, Ankeny, IA.

    Included are ideas, suggestions, and examples for selecting and designing conservation science projects. Over 70 possible conservation subject areas are presented with suggested projects. References are cited with each of these subject areas, and a separate list of annotated references is included. The references pertain to general subject…

  3. The ANTARES project

    International Nuclear Information System (INIS)

    Amram, Ph.; Anvar, S.; Aslanides, E.; Aubert, J.J.; Azoulay, R.; Basa, S.; Benhammou, Y.; Bernard, F.; Berthier, R.; Bertin, V.; Billault, M.; Biller, S.; Blanc, F.; Blanc, P.E.; Bland, R.W.; Blondeau, F.; Botton, N. de; Bottu, N.; Boulesteix, J.; Brooks, B.; Brunner, J.; Calzas, A.; Carloganu, C.; Carr, J.; Carton, P.H.; Cartwright, S.; Cases, R.; Cassol, F.; Charles, F.; Charles, J.; Desages, F.; Destelle, J.J.; Dispau, G.; Duval, P.Y.; Engelen, J.; Feinstein, F.; Flores, E.C.; Fopma, J.; Fuda, J.L.; Goret, P.; Gosset, L.; Gournay, J.F.; Hernandez, J.J.; Hubaut, F.; Hubbard, R.; Huss, D.; Jaquet, M.; Jelley, N.; Kajfasz, E.; Kouchner, A.; Kudryavtsev, V.; Lachartre, D.; Lafoux, H.; Lamare, P.; Languillat, J.C.; Laugier, J.P.; Le Provost, H.; Loiseau, D.; Loucatos, S.; Magnier, P.; Marc, K.; Marcelin, M.; Martin, L.; Mazeau, B.; Mazure, A.; McMillan, J.; Meessen, C.; Millot, C.; Mols, P.; Montanet, F.; Moorhead, M.; Moscoso, L.; Navas, S.; Nooren, Van; Olivetto, C.; Palanque-Delabrouille, N.; Pallares, A.; Payre, P.; Perrin, P.; Poinsignon, J.; Potheau, R.; Qian, Z.; Raymond, M.; Roberts, J.; Sacquin, Y.; Schuller, J.P; Schuster, W.; Spooner, N.; Stolarczyk, T.; Tabary, A.; Talby, M; Tao, C.; Thompson, L.; Triay, R.; Valdy, M.; Velasco, J.; Vigeolas, E.; Vignaud, D.; Vilanova, D.; Wark, D.; Zuniga, J.

    1999-01-01

    The ANTARES project is an international collaboration with the aim of building a deep-sea large area neutrino telescope within the next decade. The achievements and status of the project as at the time of the conference are briefly discussed, and short term steps as well as longer term plans are described

  4. The Comic Book Project

    Science.gov (United States)

    Bitz, Michael

    2008-01-01

    The Comic Book Project (CBP) celebrates its eighth anniversary this year. The project, which just originated with one school in New York City, had grown to encompass thousands of students nationwide. The goal of the CBP is not to create comics the "Marvel way" or to develop the next Stan Lee. Rather, the goal is to give students the opportunity to…

  5. Project Identification and Formulation

    DEFF Research Database (Denmark)

    Lund, Søren; Lønholdt, Jens

    2005-01-01

    Provides the necessary conceptual framework and tools to assess all appropriate aspects of water and sanitation projects in developing countries. Appeals to graduate environmental engineering students, practitioners, economists, sociologists, and institutional planners working with water...... and sanitation projects in developing countries....

  6. Climate projections FAQ

    Science.gov (United States)

    A.E. Daniels; J.F. Morrison; L.A. Joyce; N.L. Crookston; S.C. Chen; S.G. McNulty

    2012-01-01

    Climate scenarios offer one way to identify and examine the land management challenges posed by climate change. Selecting projections, however, requires careful consideration of the natural resources under study, and where and how they are sensitive to climate. Selection also depends on the robustness of different projections for the resources and geographic area of...

  7. Plant Biology Science Projects.

    Science.gov (United States)

    Hershey, David R.

    This book contains science projects about seed plants that deal with plant physiology, plant ecology, and plant agriculture. Each of the projects includes a step-by-step experiment followed by suggestions for further investigations. Chapters include: (1) "Bean Seed Imbibition"; (2) "Germination Percentages of Different Types of Seeds"; (3)…

  8. Private Water Projects

    OpenAIRE

    Izaguirre, Ada Karina; Hunt, Catherine

    2005-01-01

    Drawing on the World Bank's Private Participation in Infrastructure Project Database, this Note reviews developments in the water and sewerage sector of developing countries in 2004 and changes in private participation in the sector since 2001. Data for 2004 show that total investment in water and sewerage projects with private participation amounted to nearly US$2 billion. Recent private ...

  9. Classifying IS Project Problems

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas

    2006-01-01

    The literature contains many lists of IS project problems, often in the form of risk factors. The problems sometimes appear unordered and overlapping, which reduces their usefulness to practitioners as well as theoreticians. This paper proposes a list of criteria for formulating project problems...

  10. Creatvity in Project Work

    DEFF Research Database (Denmark)

    Bjørner, Thomas; Kofoed, Lise B.; Bruun-Pedersen, Jon Ram

    2012-01-01

    that they are creative during all stages in the project work. However, it is also significant that the Medialogy students believe that they are more creative in the beginning of their projects and during the design and implementation stages, whereas the analysis is a less creative part. In general, the Medialogy...

  11. Financing landfill gas projects

    International Nuclear Information System (INIS)

    Bull, R.

    1992-01-01

    The problems of financing landfill gas projects in the UK in the last few years are discussed. The approach of the author in setting up a company to finance such projects in the power generation field and a separate company to design and supply turnkey packages is reported. (UK)

  12. The Nordwrite Project.

    Science.gov (United States)

    Evensen, Lars, Sigfred

    A planned 3-year joint project of the Nordic research council for the humanities that focuses on writing development in school-age children is described. Four Nordic countries are involved in the project: Finland, Sweden, Norway, and Denmark. In the study, discourse-level performance analyses of student writing in English as a Second Language are…

  13. The Okapi Projects.

    Science.gov (United States)

    Keen, Michael

    1997-01-01

    Examines general issues in conducting information retrieval research. Topics include the Okapi information retrieval system and its probabilistic model; the Cranfield projects, concerning recall and precision; the SMART project with its vector-space model; evaluation methodology, including laboratory evaluation of interactive systems; and…

  14. The TULIP Project.

    Science.gov (United States)

    Gusack, Nancy, Ed.; And Others

    1995-01-01

    Contains 11 articles that describe different university access systems designed and built to provide access to journals via The University Licensing Program (TULIP), a science journal access project, involving Elsevier Science Publishing and major universities. The project produced insights to help with future electronic information delivery…

  15. Impact of Project Leadership Facets on Project Outcome

    Directory of Open Access Journals (Sweden)

    Arslan Ayub

    2015-08-01

    Full Text Available The study analyzes the role of project leadership facets on effective project outcome. Numerous such initiatives have already been taken on project outcome/performance in the context of apposite leadership styles or project management. However, the current study is unique in the milieu of project outcome that it introduces a new leadership approach, which throws light on the significance of variant leadership facets on project outcome. The study uses explanatory approach; primary data is collected from project management professionals working in different project organizations. The study uses structural equation model (SEM technique to test the hypothesis. The study found a positive relationship between project leadership facets and project outcome.

  16. Solar renovation demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Bruun Joergensen, O [ed.

    1998-10-01

    In the framework of the IEA SHC Programme, a Task on building renovation was initiated, `Task 20, Solar Energy in Building Renovation`. In a part of the task, Subtask C `Design of Solar Renovation Projects`, different solar renovation demonstration projects were developed. The objective of Subtask C was to demonstrate the application of advanced solar renovation concepts on real buildings. This report documents 16 different solar renovation demonstration projects including the design processes of the projects. The projects include the renovation of houses, schools, laboratories, and factories. Several solar techniques were used: building integrated solar collectors, glazed balconies, ventilated solar walls, transparent insulation, second skin facades, daylight elements and photovoltaic systems. These techniques are used in several simple as well as more complex system designs. (au)

  17. Strategy as Projects

    DEFF Research Database (Denmark)

    Lund Pedersen, Carsten; Ritter, Thomas; Andersen, Torben Juul

    This paper proposes the adoption of a project-based view to analyze strategy formation and strategic renewal over time. Projects are resource-committing, empirically-tracable investments, and as such, particularly suitable for the analysis of different manifestations of intended strategies as well...... as post-hoc manifestations of deviant, even rebellious, actions taken in opposition to the initial strategy announcement. The paper presents an analytical framework (a 5x2 matrix) of ten different project categories that together allows researchers to investigate how strategic renewal is realized through...... the enactment of different types of project initiatives throughout the organization. The developed framework is validated by two field studies that outline the robustness of the proposed matrix. In addition to the demonstration of the advantages of the framework, we discuss the limitations of the strategy-as-projects...

  18. Project management for engineers

    CERN Document Server

    Bennett, Michael J

    2014-01-01

    Project Management for Engineers, as the title suggests, is a direct attempt at addressing the ever-increasing and specific needs for better project management of engineering students, practicing engineers and managers in the industry. It aims not only to present the principles and techniques of Project Management, but also to discuss project management standards, processes and requirements, such as PMBOK, IEEE and PRINCE. Each chapter begins with the basics of the theme being developed at a level understandable to an undergraduate, before more complex topics are introduced at the end of each section that are suitable for graduate students. For the practicing professionals or managers in the industry, the book also provides many real illustrations of practical application of the principles of Project Management. Through a realistic blend of theory and practical examples, as well as an integration of the engineering technical issues with business issues, this book seeks to remove the veil of mystery that has...

  19. EDUCATIONAL PROJECTS STAKEHOLDER MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Юлія Юріївна ГУСЄВА

    2016-02-01

    Full Text Available An approach based on an integration of requirements breakdown structure and work breakdown structure of the project is proposed. It can complement existing methods of project stakeholders classification with the indicator of resource input, which can be defined in monetary terms. A method of requirements monitoring is proposed, which allows you to track the requirements of project stakeholders over time according to the actual amount of resources spent by analogy with the earned value method. Proposed indexes are the basis not only for monitoring but for the forecast of the project. The need of creating of a mechanism for getting baseline data taking into account the existence of different types of requirements of project stakeholders is grounded.

  20. Distributed Project Work

    DEFF Research Database (Denmark)

    Borch, Ole; Kirkegaard, B.; Knudsen, Morten

    1998-01-01

    for information exchange in the traditional project environment is performed. A group of teachers and a student group using small project examples test the method. The first test group used a prototype for testing and found the new activity synchronization difficult to adapt, so the method was finally adjusted...... to be very precises and with success used on the second test group. Distributed project work is coming pretty soon and with little improvement in server tools, projects in different topics with a large and inhomogeneous profile of users are realistic.......Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work...

  1. Bioenergy/Biotechnology projects

    Energy Technology Data Exchange (ETDEWEB)

    Napper, Stan [Louisiana Tech Univ., Ruston, LA (United States); Palmer, James [Louisiana Tech Univ., Ruston, LA (United States); Wilson, Chester [Louisiana Tech Univ., Ruston, LA (United States); Guilbeau, Eric [Louisiana Tech Univ., Ruston, LA (United States); Allouche, Erez [Louisiana Tech Univ., Ruston, LA (United States)

    2012-06-30

    This report describes the progress of five different projects. The first is an enzyme immobilization study of cellulase to reduce costs of the cellulosic ethanol process. High reusability and use of substrates applicable to large scale production were focus areas for this study. The second project was the development of nanostructured catalysts for conversion of syngas to diesel. Cobalt nanowire catalyst was used in Fischer-Tropsch synthesis. The third project describes work on developing a microfluidic calorimeter to measure reaction rates of enzymes. The fourth project uses inorganic polymer binders that have the advantage of a lower carbon footprint than Portland cement while also providing excellent performance in elevated temperature, high corrosion resistance, high compressive and tensile strengths, and rapid strength gains. The fifth project investigates the potential of turbines in drop structures (such as sewer lines in tall buildings) to recover energy.

  2. projecting pARTicles, a STEAM project

    CERN Document Server

    Goldfarb, Steven; The ATLAS collaboration

    2016-01-01

    Agnes Chavez is a media artist based in the US (New Mexico) and involved in STEM Art Labs. An informal partnership initiated with some ATLAS physicists will develop further in 2016 through a series of workshops where Virtual Visits, Master Class material and the presence of a physicist will be gradually integrated. The project can be seen as an illustration of constructive and long term collaboration between artists, students and scientists.

  3. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    OpenAIRE

    Tamara Gvozdenovic; Mirjana Miljanovic; Aleksandar Jegdic; Zeljko Crnogorcic

    2008-01-01

    One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviatio...

  4. Financing of Chamera project

    International Nuclear Information System (INIS)

    Jain, A.K.; Chakraborty, D.K.

    1994-01-01

    Chamera Hydroelectric Project was selected by National Hydroelectric Power Corporation (NHPC) as a pilot project for accelerated development of hydro-power in the country. This project was considered to have certain distinct specialties from different aspects in comparison with other projects. In the first place, the field investigation for the project was completed in a record time of only eight months by deploying the most modern techniques. Secondly, Chamera was the first NHPC project with external aid both technically and financially. The third and most important of all the specialties was in the planned reduction of construction period to 6 years from the original estimate of 8 years. Such reduction of gestation period was considered to be the direct outcome of modern method of management, monitoring and improved imported technology. The investment decision in the project was taken in April '84 with an estimated cost of energy at busbar 44.12 paise/unit exclusive of return on equity capital and royalty payable to the home state. The all inclusive rate of power was estimated 75.86 paise/unit. (author). 4 tabs

  5. Improving Project Manufacturing Coordination

    Directory of Open Access Journals (Sweden)

    Korpivaara Ville

    2014-09-01

    Full Text Available The objective of this research is to develop firms’ project manufacturing coordination. The development will be made by centralizing the manufacturing information flows in one system. To be able to centralize information, a deep user need assessment is required. After user needs have been identified, the existing system will be developed to match these needs. The theoretical background is achieved through exploring the literature of project manufacturing, development project success factors and different frameworks and tools for development project execution. The focus of this research is rather in customer need assessment than in system’s technical expertise. To ensure the deep understanding of customer needs this study is executed by action research method. As a result of this research the information system for project manufacturing coordination was developed to respond revealed needs of the stakeholders. The new system improves the quality of the manufacturing information, eliminates waste in manufacturing coordination processes and offers a better visibility to the project manufacturing. Hence it provides a solid base for the further development of project manufacturing.

  6. Projected coupled cluster theory.

    Science.gov (United States)

    Qiu, Yiheng; Henderson, Thomas M; Zhao, Jinmo; Scuseria, Gustavo E

    2017-08-14

    Coupled cluster theory is the method of choice for weakly correlated systems. But in the strongly correlated regime, it faces a symmetry dilemma, where it either completely fails to describe the system or has to artificially break certain symmetries. On the other hand, projected Hartree-Fock theory captures the essential physics of many kinds of strong correlations via symmetry breaking and restoration. In this work, we combine and try to retain the merits of these two methods by applying symmetry projection to broken symmetry coupled cluster wave functions. The non-orthogonal nature of states resulting from the application of symmetry projection operators furnishes particle-hole excitations to all orders, thus creating an obstacle for the exact evaluation of overlaps. Here we provide a solution via a disentanglement framework theory that can be approximated rigorously and systematically. Results of projected coupled cluster theory are presented for molecules and the Hubbard model, showing that spin projection significantly improves unrestricted coupled cluster theory while restoring good quantum numbers. The energy of projected coupled cluster theory reduces to the unprojected one in the thermodynamic limit, albeit at a much slower rate than projected Hartree-Fock.

  7. RCA's regional industrial project

    International Nuclear Information System (INIS)

    Ali, A.T.

    1988-01-01

    The Regional Cooperation Agreement (RCA) for Research Development and Training Related to Nuclear Science and Technology, formulated under the auspices of the International Atomic Energy Agency (IAEA), came into force in June 1972. The overall objective of RCA is to promote technical cooperation among the developing and developed countries in the Asia Pacific region in the peaceful uses of nuclear energy and related technology. Currently, the biggest project under RCA is the Regional Project on the Industrial Applications of Isotopes and Radiation Technology for Asia and the Pacific. The project was established in 1982 for a period of five years and was completed in December 1986. The first phase of the project has generated a high degree of awareness on the industrial potential of isotopes and radiation technology throughout the region; produced a cadre of trained manpower in all areas covered by the project; identified the expertise available in the region; and developed in the region, a unique network of people and institutions involved with the utilization of isotope and radiation technology. A Phase II of the project, which cover all but one of the sub-projects under Phase I, was approved in early 1987 for another five years until 1991. (Nogami, K.)

  8. New Accelerator Projects

    International Nuclear Information System (INIS)

    Delahaye, J.P.

    2010-01-01

    There is large number of ambitious accelerator projects with promising performances in the near (and short term) future which aims at exploring energy and/or luminosity frontiers and Complementary aspects of various particles species. High Energy Physics requirements are extremely demanding with challenging parameters: entering into the new territories of the tera-scale data, high Energy or/and High (Integrated) Luminosity, high performance, high availability, long lifetime, luminosity leveling etc.. New projects are more and more challenging: larger, more powerful, more expensive, technology above present standard. Innovative ideas and breakthrough on novel technologies are key for HEP adventure. Aggressive R and D is imperative on beam and Technology related, on cost and power consumption mitigation.. There is ambitious Test Facilities to address feasibility. More and more time and (M and P) resources are required from first ideas to project proposal: it is of prime importance to launch R and D early, explore all possible options of schemes and technologies (anticipating future Physics requests), make realistic status and schedule estimates (preserve credibility and make reasonable plans). Global Collaboration is mandatory from the R and D phase to the construction and operation in order to make best use of limited resources and available expertise as inspired from successful collaborations on Detectors. The global strategy of new accelerator projects in truly world-wide collaboration aims at: - defining all various Projects and Technology options worth exploring, - taking advantage of global teams made of world-wide experts, and of synergies to address common issues (generic R and D) of various projects, - preparing together plethora of project proposals to cover Physics Landscape (ready for window opportunity), - developing Collaborative/Competition (Experts in Collaboration, Technology and Projects options in Competition), - Joining resources on (few) selected

  9. The Project of Success

    DEFF Research Database (Denmark)

    Kreiner, Kristian

    more complicated matter than meeting targets. While success may ultimately be justified in terms of a correspondence between aims and achievements, the understanding of both aspects is highly dependent on the project process. An example of a successful project that did not meet the original performance...... targets will serve to show that success is at matter of perspective as much as it is a matter of achievement. Other types of research, e.g. social psychology, have addressed the issue of success more explicitly. I draw on such literature to conceptualize project success anew and to reestablish...

  10. IT Project Prioritization Process

    DEFF Research Database (Denmark)

    Shollo, Arisa; Constantiou, Ioanna

    2013-01-01

    In most of the large companies IT project prioritization process is designed based on principles of evidencebased management. We investigate a case of IT project prioritization in a financial institution, and in particular, how managers practice evidence-based management during this process. We use...... a rich dataset built from a longitudinal study of the prioritization process for the IT projects. Our findings indicate that managers reach a decision not only by using evidence but from the interplay between the evidence and the judgment devices that managers employ. The interplay between evidence...

  11. Raspberry Pi projects

    CERN Document Server

    Robinson, Andrew

    2013-01-01

    Learn to build software and hardware projects featuring the Raspberry Pi! Raspberry Pi represents a new generation of computers that encourages the user to play and to learn and this unique book is aimed at the beginner Raspberry Pi user who is eager to get started creating real-world projects. Taking you on a journey of creating 15 practical projects, this fun and informative resource introduces you to the skills you need to have in order to make the most of the Pi. The book begins with a quick look at how to get the Pi up and running and then encourages you to dive into the array of exciti

  12. The CORMAN project

    DEFF Research Database (Denmark)

    Bregnballe, Thomas

    2013-01-01

    The CORMAN project (‘Sustainable Management of Cormorant Populations’) is now in its final year. The main goals have been (1) to collaborate with the CRG in order to assess the number and distribution of Cormorants in Europe during breeding and wintertime, and (2) to create the EU Cormorant...... Platform in order to disseminate information. The project has also engaged with key European stakeholder groups and formed a Stakeholders Liaison Group to support information exchange and discuss relevant issues. The project is carried out on behalf of DG Environment under the European Commission....

  13. Making energy projects happen

    International Nuclear Information System (INIS)

    Gilliland, S.F.; Utt, W.P.; Neff, N.T.

    1988-01-01

    In today's business environment, control of energy cost is a major challenge for businesses, institutions, and governmental agencies. New technologies are available to reduce energy costs through cogeneration, cheaper fuels, or other means. Often it is not possible for a Plant Owner to undertake such a project, regardless of how desirable it may be. The authors of this paper show that by applying the principles of Project Structuring and developing a comprehensive project team, the desired reduction in energy costs can be achieved. Various examples are cited, and guidelines are given for an Owner to use

  14. Status of APE projects

    CERN Document Server

    Alfieri, R; Onofri, E; Bartoloni, A; Battista, C; Cabibbo, Nicola; Cosimi, M; Lonardo, A; Michelotti, A; Proietti, B; Rapuano, F; Rossetti, D; Sacco, G; Tassa, S; Torelli, M; Vicini, P; Pène, O; Errico, W; Magazzù, G; Sartori, L; Schiiano, F; Tripiccione, R; De Riso, P; Petronzio, Roberto; Destri, C; Frezzotti, R; Marchesini, G; Gensch, Ulrich; Jansen, K; Kretzschmann, A; Leich, H; Paschedag, N; Pleiter, D; Schwendicke, U; Simma, H; Sommer, Rainer; Sulanke, K; Wegner, P; Fucci, A; Martin, B; Pech, J; Panizzi, E; Petricola, A

    2001-01-01

    This talk is divided in two parts. In the first part, we will summarize the status of the APEmille project that will be completed by the end of the year. We will then devote the rest of the talk to the description of a new project for a multi-TeraFlop machine, ape NEXT. The interested reader will find a much more detailed discussion of all the items touched upon here in the full proposal of the project that will shortly appear on hep-lat. (9 refs).

  15. WFIRST Project Science Activities

    Science.gov (United States)

    Gehrels, Neil

    2012-01-01

    The WFIRST Project is a joint effort between GSFC and JPL. The project scientists and engineers are working with the community Science Definition Team to define the requirements and initial design of the mission. The objective is to design an observatory that meets the WFIRST science goals of the Astr02010 Decadal Survey for minimum cost. This talk will be a report of recent project activities including requirements flowdown, detector array development, science simulations, mission costing and science outreach. Details of the interim mission design relevant to scientific capabilities will be presented.

  16. Arduino projects for dummies

    CERN Document Server

    Craft, Brock

    2013-01-01

    Discover all the amazing things you can do with Arduino Arduino is a programmable circuit board that is being used by everyone from scientists, programmers, and hardware hackers to artists, designers, hobbyists, and engineers in order to add interactivity to objects and projects and experiment with programming and electronics. This easy-to-understand book is an ideal place to start if you are interested in learning more about Arduino's vast capabilities. Featuring an array of cool projects, this Arduino beginner guide walks you through every step of each of the featured projects so

  17. Adaptive projective filters

    International Nuclear Information System (INIS)

    Dikusar, N.D.

    1993-01-01

    The new approach to solving of the finding problem is proposed. The method is based on Discrete Projective Transformations (DPT), the List Square Fitting (LSF) and uses the information feedback in tracing for linear or quadratic track segments (TS). The fast and stable with respect to measurement errors and background points recurrent algorithm is suggested. The algorithm realizes the family of digital adaptive projective filters (APF) with known nonlinear weight functions-projective invariants. APF can be used in adequate control systems for collection, processing and compression of data, including tracking problems for the wide class of detectors. 10 refs.; 9 figs

  18. 3D Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Johansen, Stine Liv; Bach Mikkelsen, Michelle

    2014-01-01

    Three-dimensional projection installations are particular kinds of augmented spaces in which a digital 3-D model is projected onto a physical three-dimensional object, thereby fusing the digital content and the physical object. Based on interaction design research and media studies, this article ...... Fingerplan to Loop City, is a 3-D projection installation presenting the history and future of city planning for the Copenhagen area in Denmark. The installation was presented as part of the 12th Architecture Biennale in Venice in 2010....

  19. Baltic nuclear projects

    International Nuclear Information System (INIS)

    Adlys, Gediminas; Adliene, Diana

    2009-01-01

    The Authors discuss the Baltic energy policy with respect to new nuclear power plants for Lithuania, Belarus and the Kaliningrad region. The construction of a new nuclear power plant in Lithuania would threaten Russian interests in the region. Therefore Lithuania is looking to Russian plans to build a new nuclear power plant in the Kaliningrad region as an attempt to subvert Lithuania's foreign partners and potential investors from participating in the Visaginas NPP project. However, the authors conclude, that the Visaginas NPP project is and must be the preferential project for the EU and NATO member states.

  20. The VIRGO project

    International Nuclear Information System (INIS)

    Yvert, M.

    1991-01-01

    The detection of gravitational waves is, nowadays, technologically possible. The Virgo project, proposed by a French-Italian collaboration, is now on the verge of being fully approved and funded. The goal of the Virgo project is, first, to detect gravitational waves. The next will be to perform, in conjunction with other similar detectors, more precise measurements (i.e. the spin of the graviton) and start gravitational wave astrophysical observations. The method is proposed to use a large Michelson interferometer as a detector. The main motivations, characteristics and expected sensitivity of this project are described. (R.P.) 14 refs., 6 figs

  1. The Methanol Economy Project

    Energy Technology Data Exchange (ETDEWEB)

    Olah, George [Univ. of Southern California, Los Angeles, CA (United States); Prakash, G. K. [Univ. of Southern California, Los Angeles, CA (United States)

    2014-02-01

    The Methanol Economy Project is based on the concept of replacing fossil fuels with methanol generated either from renewable resources or abundant natural (shale) gas. The full methanol cycle was investigated in this project, from production of methanol through bromination of methane, bireforming of methane to syngas, CO2 capture using supported amines, co-electrolysis of CO2 and water to formate and syngas, decomposition of formate to CO2 and H2, and use of formic acid in a direct formic acid fuel cell. Each of these projects achieved milestones and provided new insights into their respective fields.

  2. One project`s waste is another project`s resource

    Energy Technology Data Exchange (ETDEWEB)

    Short, J.

    1997-02-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables.

  3. Leading global projects for professional and accidental project leaders

    CERN Document Server

    Moran, Robert T

    2008-01-01

    This book is a must-read for anyone responsible for projects and initiatives that span functional and geographical divides. Authors Moran and Youngdahl bring extensive experience and learning from industry practice to present a clear and straightforward treatment of the leadership skills and knowledge required to lead projects that are global in nature. They have written the first book of its kind to address the three essential skills of global project leaders - strategic project management, project leadership, and cross-cultural leadership. The authors argue that global project leadership is an essential skill in our project-based world and that we are all either intentional or accidental project leaders. Intentional project leaders pursue formal project management education and even certification whereas accidental project leaders find themselves leading global projects and initiatives as a result of a special assignment or promotion. Moran and Youndahl have found that the vast majority of global projects ...

  4. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  5. Organization of BSc and MSc projects in project families

    DEFF Research Database (Denmark)

    Ottosen, Lisbeth M.; Goltermann, Per; Jensen, Pernille Erland

    2014-01-01

    This work reports organization of student thesis projects in project families, with the benefit to both teaching and learning. The project organization went from student projects broadly distributed on topics related to different research issues and individual supervision to project families with...

  6. Innovations in redevelopment projects

    Directory of Open Access Journals (Sweden)

    Radushinsky Dmitry

    2018-01-01

    Full Text Available Some examples of redevelopment of industrial territories (lofting abroad and in Russia for the purpose of qualitative research and classification, identification of the main features of process innovations are considered in the article. The following main parameters were established, according to which the differences in the implementation of various types of redevelopment projects were determined: the composition of the consumers of the services (the result of the implemented project, the opportunities and the intensity of the flow of high-class specialists to the jobs created during the redevelopment of municipal and regional facilities, area, value (budget and terms of project implementation. A perspective project of RTOs (museum-entertainment complex for machine-building in Kolpino, as well as opportunities to expand the ecosystem of innovation Sochi Innovation Valley, was considered.

  7. EURO HAWK Project Overview

    National Research Council Canada - National Science Library

    2003-01-01

    Briefing charts from presentation on a EURO HAWK project overview; an airborne system with stand-off capability for wide-area intelligence, surveillance and reconnaissance meeting European NATO countries' ISR requirements...

  8. Permitted Marine Hydrokinetic Projects

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data represents pending or issued preliminary permits or issued licenses for marine hydrokinetic projects that produce energy from waves or directly from the...

  9. Navajo Electrification Demonstraiton Project

    Energy Technology Data Exchange (ETDEWEB)

    Larry Ahasteen, Project Manager

    2006-07-17

    This is a final technical report required by DOE for the Navajo Electrification Demonstration Program, This report covers the electric line extension project for Navajo families that currently without electric power.

  10. OpenCities Project

    Data.gov (United States)

    US Agency for International Development — The Open Cities Project aims to catalyze the creation, management and use of open data to produce innovative solutions for urban planning and resilience challenges...

  11. Vitamin D Pooling Project

    Science.gov (United States)

    The Vitamin D Pooling Project of Rarer Cancers brought together investigators from 10 cohorts to conduct a large prospective epidemiologic study of the association between vitamin D status and seven rarer cancers.

  12. Lake Charles CCS Project

    Energy Technology Data Exchange (ETDEWEB)

    Leib, Thomas [Leucadia Energy, LLC, Salt Lake City, UT (United States); Cole, Dan [Denbury Onshore, LLC, Plano, TX (United States)

    2015-06-30

    In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture and Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO2) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO2 generated in a large industrial gasification process and sequester the CO2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials

  13. Autonomous Propellant Loading Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The AES Autonomous Propellant Loading (APL) project consists of three activities. The first is to develop software that will automatically control loading of...

  14. Avionics and Software Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The goal of the AES Avionics and Software (A&S) project is to develop a reference avionics and software architecture that is based on standards and that can be...

  15. Prioritization of Capital Projects

    National Research Council Canada - National Science Library

    LaVielle, Michael

    2002-01-01

    Public works capital projects in the U,S, naval forces are not prioritized and funded in a way that best uses limited operations resources and maintenance dollars, This thesis develops a linear model...

  16. Exploration Augmentation Module Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The Exploration Augmentation Module (EAM) project goal is to design and deliver a flight module that is to be deployed to Earth-Lunar Distant Retrograde Orbit (DRO)....

  17. OECD: Halden reactor project

    International Nuclear Information System (INIS)

    1979-01-01

    The work at the Project has continued in the two main fields: test fuel irradiation and fuel research, and computer based process supervision and control. Organizations participating in the Project continue to have their fuel irradiated in the Halden Reactor in instrumented test assemblies designed and manufactured by the Project. The Project's fuel studies continue to focus on specific subjects such as fuel pellet/cladding interaction and heat transfer, fission product release and fuel behavior under loss of coolant conditions. The work on process control and supervision continues in the highly relevant fields of core control and operator-process communication. A system for predictive core control is being developed while special mathematical methods for core power distribution control are being studied. Operator-process communication studies comprise use of computer simulation on colour display as important ingredients, while the work on developing a system for interactive plant disturbance analysis continues

  18. Project Quality Plan

    DEFF Research Database (Denmark)

    Sandborg-Petersen, Ulrik; Øhrstrøm, Peter

    This document defines the procedures, standards, and strategies which will be used to ensure high standards of quality of the work produced within the HANDS project. It contains the following sections...

  19. The Kintyre uranium project

    International Nuclear Information System (INIS)

    Larson, B.

    1997-01-01

    The Kintyre Uranium Project is being developed by Canning Resources Pty Ltd, a subsidiary of Rio Tinto (formerly CRA). The work on the project includes the planning and management of a number of background environmental studies. The company has also commissioned studies by external consultants into process technologies, mining strategies and techniques for extracting the uranium ore from the waste rock. In addition, Canning Resources has made a detailed assessment of the worldwide market potential for Australian uranium in the late 1990s and into the 21st century. The most significant factor affecting the future of this project is the current product price. This price is insufficient to justify the necessary investment to bring this project into production

  20. RadWorks Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The RadWorks project's overarching objective is the maturation and demonstration of affordable, enabling solutions to the radiation-related challenges presented to...

  1. The SMILING project

    DEFF Research Database (Denmark)

    Berger, Jacques; Blanchard, Gentiane; Ponce, Maiza Campos

    2013-01-01

    The "Sustainable Micronutrient Interventions to Control Deficiencies and Improve Nutritional Status and General Health in Asia" project (SMILING), funded by the European Commission, is a transnational collaboration of research institutions and implementation agencies in five Southeast Asian count...

  2. Fuel cells: Project Volta

    Energy Technology Data Exchange (ETDEWEB)

    Vellone, R.; Di Mario, F.

    1987-09-01

    This paper discusses research and development in the field of fuel cell power plants. Reference is made to the Italian research Project Volta. Problems related to research program financing and fuel cell power plant marketing are discussed.

  3. Casio Graphical Calculator Project.

    Science.gov (United States)

    Stott, Nick

    2001-01-01

    Shares experiences of a project aimed at developing and refining programs written on a Casio FX9750G graphing calculator. Describes in detail some programs used to develop mental strategies and problem solving skills. (MM)

  4. Current Resource Imagery Projects

    Data.gov (United States)

    Farm Service Agency, Department of Agriculture — Map showing coverage of current Resource imagery projects. High resolution/large scale Resource imagery is typically acquired for the U.S. Forest Service and other...

  5. The WPU Project

    DEFF Research Database (Denmark)

    Jensen, Janne Jul; Skov, Mikael B.; Stage, Jan

    2008-01-01

    in the course of the project, when there is neither time nor financial possibilities for solving the problems. The objective of the WPU project is to develop new methods for usability engineering in the development of web portals and to test these methods in companies that develop modern web portals. The result......The Web Portal Usability (WPU) project focuses on usability in the development of modern web portals. Web portals are a key part of software development. They are created to provide a group of users with access to a collection of internet services. State-of-the-art methods for usability engineering...... is a catalogue of methods that support usability engineering in web portal development, combined with guidelines for use, training programmes and documented experience from deployment and use of the methods. The WPU project is a collaborative effort between researchers from Aalborg University, Department...

  6. Circular fringe projection profilometry.

    Science.gov (United States)

    Zhao, Hong; Zhang, Chunwei; Zhou, Changquan; Jiang, Kejian; Fang, Meiqi

    2016-11-01

    In this Letter, a novel three-dimensional (3D) measurement method, called the circular fringe projection profilometry (CFPP), is proposed. Similar to the conventional fringe projection profilometry, CFPP also requires fringe pattern projection and capture, phase demodulation, and phase unwrapping. However, it works with a totally different mechanism. CFPP recovers the height of a point by calculating its distance to the optical center of a projector along the optical axis. This distance is calculated with the aid of the divergence angle of a projected light ray and the distance between the measured point and the optical axis. The distance between the measured point and the optical axis is detected by a camera with telecentric lenses, while the divergence angle can be calculated from the phase of a captured circular fringe pattern. The validity of CFPP is confirmed by a set of experiments.

  7. DOE Robotics Project

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    This document provide the bimonthly progress reports on the Department of Energy (DOE) Robotics Project by the University of Michigan. Reports are provided for the time periods of December 90/January 91 through June 91/July 91. (FI)

  8. Animal Science Project

    International Nuclear Information System (INIS)

    Anon.

    Researches carried out in the 'Animal Science Project' of the Agricultural Nuclear Energy Center, Piracicaba, Sao Paulo state, Brazil, are described. Such researches comprise : immunology and animal nutrition. Tracer techniques are employed in this study. (M.A.) [pt

  9. Wind project gets boost

    Energy Technology Data Exchange (ETDEWEB)

    Oirere, Shem

    2012-11-01

    The development of a two-phase 100 MW wind power plant project in Tanzania moved a notch higher this year when Export-Import Bank of China extended a US$ 123 million non-concessional loan for its construction.

  10. Status of CSNS project

    International Nuclear Information System (INIS)

    Zhang, J.; Fu, S.N.; Chen, H.S.

    2015-01-01

    The China Spallation Neutron Source (CSNS) accelerator is designed to accelerate proton beam pulses to 1.6 GeV at 25 Hz repetition rate, striking a solid metal target to produce spallation neutrons. The accelerator provides a beam power of 100 kW on the target in the first phase and then 500 kW in the second phase by increasing the average beam intensity 5 times while raising the linac output energy. The project construction has been formally launched in 2011 and it is planned to complete the project in March 2018. It is one of the high intensity proton accelerator projects in the world and it imposes a great challenge to Chinese accelerator community. This presentation will cover the status and challenges of the CSNS project. (author)

  11. Oluvil Port Development Project

    DEFF Research Database (Denmark)

    Frigaard, Peter; Margheritini, Lucia

    Oluvil Port Development Project is the first development of a large port infrastructure in the entire eastern coastline of Sri Lanka. The project is supported by the Danish Foreign Ministry. Feasibility studies and detailed design studies were carried out by Lanka Hydraulic Institute Ltd during...... the years 1995 to 2003. The design was reviewed by COWI a/s. Construction of the port was started in 2008. MT Højgaard a/s acted as contractor. The outer breakwaters were constructed as first part of the project. During and after completion of the breakwaters a serious beach erosion and sand accumulation...... has been observed. Severe erosion is seen north of the harbour and some accumulation of sand is seen south of the harbour. On a sandy coastline like the one in Oluvil such erosion problems as observed are very typical. The report: Oluvil Port Development Project: Studies on Beach Erosion written...

  12. Evaluation of microfinance projects.

    Science.gov (United States)

    Johnson, S

    1999-08-01

    This paper criticizes the quick system proposed by Henk Moll for evaluating microfinance projects in the article ¿How to Pre-Evaluate Credit Projects in Ten Minutes¿. The author contended that there is a need to emphasize the objectives of the project. The procedure used by Moll, he contended, is applicable only to projects that have only two key objectives, such as credit operations, and the provision of services. Arguments are presented on the three specific questions proposed by Moll, ranging from the availability of externally audited financial reports, the performance of interest rate on loans vis-a-vis the inflation rate, and the provision of loans according to the individual requirements of the borrowers. Lastly, the author emphasizes that the overall approach is not useful and suggests that careful considerations should be observed in the use or abuse of a simple scoring system or checklist such as the one proposed by Moll.

  13. Water Recovery Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The AES Water Recovery Project (WRP) is advancing environmental control and life support systems water recovery technologies to support human exploration beyond low...

  14. ALICE Time Projection Chamber

    CERN Multimedia

    Lippmann, C

    2013-01-01

    The Time Projection Chamber (TPC) is the main device in the ALICE 'central barrel' for the tracking and identification (PID) of charged particles. It has to cope with unprecedented densities of charges particles.

  15. Health System Measurement Project

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Health System Measurement Project tracks government data on critical U.S. health system indicators. The website presents national trend data as well as detailed...

  16. Agile & Distributed Project Management

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Pries-Heje, Lene

    2011-01-01

    Scrum has gained surprising momentum as an agile IS project management approach. An obvious question is why Scrum is so useful? To answer that question we carried out a longitudinal study of a distributed project using Scrum. We analyzed the data using coding and categorisation and three carefully...... selected theoretical frameworks. Our conclusion in this paper is that Scrum is so useful because it provides effective communication in the form of boundary objects and boundary spanners, it provides effective social integration by building up social team capital, and it provides much needed control...... and coordination mechanisms by allowing both local and global articulation of work in the project. That is why Scrum is especially useful for distributed IS project management and teamwork....

  17. The Key Lake project

    International Nuclear Information System (INIS)

    Glattes, G.

    1985-01-01

    Aspects of project financing for the share of the Canadian subsidiary of Uranerzbergbau-GmbH, Bonn, in the uranium mining and milling facility at Key Lake, Saskatchewan, by a Canadian bank syndicate. (orig.) [de

  18. Principles of project management

    Science.gov (United States)

    1982-01-01

    The basic principles of project management as practiced by NASA management personnel are presented. These principles are given as ground rules and guidelines to be used in the performance of research, development, construction or operational assignments.

  19. The European XFEL project

    International Nuclear Information System (INIS)

    Floettmann, K.

    2005-01-01

    The European XFEL project is a 4th generation synchrotron radiation facility based on the SASE FEL concept and the superconducting TESLA technology for a linear accelerator. In February 2003 the German government decided that the XFEL should be realized as a European project and be located at DESY in Hamburg. The paper will give an overview of the overall layout and parameters of the facility, with emphasis on the accelerator design, technology and physics. (author)

  20. The human genome project

    International Nuclear Information System (INIS)

    Worton, R.

    1996-01-01

    The Human Genome Project is a massive international research project, costing 3 to 5 billion dollars and expected to take 15 years, which will identify the all the genes in the human genome - i.e. the complete sequence of bases in human DNA. The prize will be the ability to identify genes causing or predisposing to disease, and in some cases the development of gene therapy, but this new knowledge will raise important ethical issues

  1. 6 Sigma project advance

    International Nuclear Information System (INIS)

    2002-12-01

    This book deals with 6 sigma project advance which introduces 6 sigma project in Changwon special steel, how is failure accepted? CTQ selection which is starting line, definition of performance standard, measurement system check on reliability of measurement data, check of process capacity for current level, establishment of target, optimal design and performance of application, practice of management system for maintain of improved result, CTQ selection, check of measurement system and practice of management system.

  2. LNG project - contractual aspects

    Energy Technology Data Exchange (ETDEWEB)

    Goncalves, Bruno Almeida

    2008-07-01

    This paper intends to provide from the legal point of view an outline of the main challenges of a LNG project in the upstream, regulatory aspects, liquefaction, financing and midstream through a basic checklist; an overview of the contractual complexity of a LNG project; some basic discussion of particular LNG contract clauses; and a comparative analysis between the classic clauses of a Gas Transportation Agreement (GTA) through a gas pipeline and LNG logistic. (author)

  3. Nuclear safety project

    International Nuclear Information System (INIS)

    1982-06-01

    The Annual Report 1981 is a detailed description (in German language) of work within the Nuclear Safety Project performed in 1981 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on - work completed - results obtained - plans for future work. This report was compiled by the project management. (orig.) [de

  4. Project Nuclear Safety

    International Nuclear Information System (INIS)

    1981-11-01

    The semiannual progress report 1981/1 is a description of work within the Nuclear Safety Project performed in the first six month of 1981 in the nuclear safety field by KfK institutes and departments and by external institutions on behalf of KfK. The chosen kind of this report is that of short summaries, containing the topics, work performed, results obtained, plans for future work. This report was compiled by the project management. (orig.) [de

  5. Barakah Project in UAE

    Energy Technology Data Exchange (ETDEWEB)

    Petrunik, K. [Emirates Nuclear Energy Corp., Abu Dhabi (United Arab Emirates)

    2014-07-01

    This paper reviews the Barakah Project in United Arab Emirates (UAE). Development of UAE nuclear power plant programme is proceeding and construction is well under way. Nuclear energy is a compelling solution to energy demand in the UAE. Economics, environment, energy security, diversification and industrial development are the key drivers of this program. The project continues ro meet construction milestones, capacity building and training on UAE Nationals.

  6. Nuclear safety project

    International Nuclear Information System (INIS)

    1984-11-01

    The semiannual progress report 1984/1 is a description of work within the Nuclear Safety Project performed in the first six month of 1984 in the nuclear safety field by KfK institutes and departements and by external institutions on behalf of KfK. The chosen kind of this report is that of short summaries, containing the topics work performed, results obtained and plans for future work. This report was compiled by the project management. (orig./RW) [de

  7. The Esmeralda project

    International Nuclear Information System (INIS)

    Sophy, Y.

    1979-01-01

    This paper discusses the Esmeralda Project for studying extensive fires involving up to 70 metric tons of sodium. The design objectives and major features of the project are presented. The need for sodium fire testing on such a scale, results from problems of similitude arising from the extrapolation of previous results to fires liable to occur in large fast neutron reactors such as Super-Phenix. (author)

  8. The WPU Project

    DEFF Research Database (Denmark)

    Jensen, Janne Jul; Skov, Mikael B.; Stage, Jan

    2009-01-01

    The Web Portal Usability (WPU) project is working on usability engineering methods, which are important in the development of Web portals. These methods are tested with companies that design modern Web portals.......The Web Portal Usability (WPU) project is working on usability engineering methods, which are important in the development of Web portals. These methods are tested with companies that design modern Web portals....

  9. The SOLEIL project

    International Nuclear Information System (INIS)

    2001-01-01

    The SOLEIL project is built around an optimized 2,5 GeV positron storage ring with its own injector, i-e, a linear accelerator and a booster. This paper gathers information on the main characteristics of the project and more specially on the budget, the staff, the overall time table and a presentation of the Synchrotron Soleil Society. (A.L.B.)

  10. Artificial Intelligence Project

    Science.gov (United States)

    1990-01-01

    Symposium on Aritificial Intelligence and Software Engineering Working Notes, March 1989. Blumenthal, Brad, "An Architecture for Automating...Artificial Intelligence Project Final Technical Report ARO Contract: DAAG29-84-K-OGO Artificial Intelligence LaboratO"ry The University of Texas at...Austin N>.. ~ ~ JA 1/I 1991 n~~~ Austin, Texas 78712 ________k A,.tificial Intelligence Project i Final Technical Report ARO Contract: DAAG29-84-K-0060

  11. Raspberry Pi robotics projects

    CERN Document Server

    Grimmett, Richard

    2015-01-01

    This book is for enthusiasts who want to use the Raspberry Pi to build complex robotics projects. With the aid of the step-by-step instructions in this book, you can construct complex robotics projects that can move, talk, listen, see, swim, or fly. No previous Raspberry Pi robotics experience is assumed, but even experts will find unexpected and interesting information in this invaluable guide.

  12. The Bruce nuclear project

    International Nuclear Information System (INIS)

    Rose, J.B.

    1981-01-01

    This case study assesses the industrial relations impact of the construction of the Bruce Nuclear Power Development. It examines the labour relations system in the Ontario electric power sector and in major building construction. Industrial relations problems and practices at the Bruce project are reviewed. The focus of the study is on the relationship between the project and the rest of the Ontario industrial construction industry

  13. The Mississippi CCS Project

    Energy Technology Data Exchange (ETDEWEB)

    Doug Cathro

    2010-09-30

    The Mississippi CCS Project is a proposed large-scale industrial carbon capture and sequestration (CCS) project which would have demonstrated advanced technologies to capture and sequester carbon dioxide (CO{sub 2}) emissions from industrial sources into underground formations. Specifically, the Mississippi CCS Project was to accelerate commercialization of large-scale CO{sub 2} storage from industrial sources by leveraging synergy between a proposed petcoke to Substitute Natural Gas (SNG) plant that is selected for a Federal Loan Guarantee and would be the largest integrated anthropogenic CO{sub 2} capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Mississippi CCS Project was to promote the expansion of enhanced oil recovery (EOR) in the Mississippi, Alabama and Louisiana region which would supply greater energy security through increased domestic energy production. The capture, compression, pipeline, injection, and monitoring infrastructure would have continued to sequester CO{sub 2} for many years after the completion of the term of the DOE agreement. The objectives of this project were expected to be fulfilled through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 included the studies that establish the engineering design basis for the capture, compression and transportation of CO{sub 2} from the MG SNG Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Soso oil field in Mississippi. The overall objective of Phase 2, was to execute design, construction and operations of three capital projects: the CO{sub 2} capture and compression equipment, the Mississippi CO{sub 2} Pipeline to Denbury's Free State Pipeline, and an MVA system at the Soso oil field.

  14. The LHC project

    CERN Multimedia

    CERN. Geneva

    2002-01-01

    At the halfway point in the construction of the LHC, the project is now moving from the design and procurement phase to the installation phase, which officially started on 1st March. An overview of the progress of the project is given and the final schedule for installation and commissioning is discussed. The talk will be given in English but questions can be taken in French.

  15. Projective moment invariants

    Czech Academy of Sciences Publication Activity Database

    Suk, Tomáš; Flusser, Jan

    2004-01-01

    Roč. 26, č. 10 (2004), s. 1364-1367 ISSN 0162-8828 R&D Projects: GA ČR GA201/03/0675 Institutional research plan: CEZ:AV0Z1075907 Keywords : projective transform * moment invariants * object recognition Subject RIV: JD - Computer Applications, Robotics Impact factor: 4.352, year: 2004 http://library.utia.cas.cz/prace/20040112.pdf

  16. Student Research Projects

    Science.gov (United States)

    Yeske, Lanny A.

    1998-01-01

    Numerous FY1998 student research projects were sponsored by the Mississippi State University Center for Air Sea Technology. This technical note describes these projects which include research on: (1) Graphical User Interfaces, (2) Master Environmental Library, (3) Database Management Systems, (4) Naval Interactive Data Analysis System, (5) Relocatable Modeling Environment, (6) Tidal Models, (7) Book Inventories, (8) System Analysis, (9) World Wide Web Development, (10) Virtual Data Warehouse, (11) Enterprise Information Explorer, (12) Equipment Inventories, (13) COADS, and (14) JavaScript Technology.

  17. The international hydrocoin project

    International Nuclear Information System (INIS)

    1987-01-01

    The International HYDROCOIN (Hydrologic Code Intercomparison) Project was started in May 1984. Fourteen organizations participate in the Project, with the Swedish Nuclear Power Inspectorate (SKI) as managing participant and the OECD Nuclear Energy Agency (NEA) taking part as a member of the Project secretariat. HYDROCOIN is concerned with the assessment of groundwater movements at potential nuclear waste disposal sites with the help of mathematical models and computer codes. The Project is divided into three levels. The objective of HYDROCOIN Level 1 is to verify the accuracy of groundwater flow codes. HYDROCOIN Level 2 and Level 3 are concerned with validation of hydrological models and uncertainty/sensitivity analysis, respectively. This report, which has been prepared by the NEA Secretariat and SKI in consultation with the co-ordinating group of the HYDROCOIN Project summarizes the background and objectives of the Project and presents the results of the work performed up to the middle of 1987. It is intended to provide general information on HYDROCOIN to interested parties beyond the group of directly involved specialists

  18. Managing a sensitive project

    International Nuclear Information System (INIS)

    Etcheber, Pascal

    1998-01-01

    A 'sensitive' project needs to be managed differently from a 'normal' project. This statement might seem simple enough. However, it does not seem to be a simple task to prove it in twenty minutes. This paper is an attempt to share with the audience some of the experiences the company had dealing with sensitive projects. It describes what a sensitive project is, though of all people, the 'nuclear' should know. Then the common mistakes are described, that are made in the hoping that some personal experiences are recognised. Finally the company's strategy is shown, how we foster third party support and the main tools to be used. Ultimately, success is ensured by having a sufficient quantity of allies. A sensitive project does not die because it has too many opponents, but because it has too few allies. Finding and helping allies to act is the thrust of our activity. It enables sensitive projects which deserve to succeed to do so, where traditional management fails miserably

  19. The international Chernobyl project

    International Nuclear Information System (INIS)

    1991-01-01

    This article summarizes the official report of the International Advisory Committee at the conference of the International Chernobyl Project held in Vienna, May 1991. More details will be found in the actual report, ''The International Chernobyl Project: An Overview'' (INI22:066284/5). Measurements and assessments carried out under the project provided general corroboration of the levels of surface cesium-137 contamination reported in the official maps. The project also concluded that the official procedures for estimating radiation doses to the population were scientifically sound, although they generally resulted in overestimates of two- to threefold. The project could find no marked increase in the incidence of leukemia or cancer, but reported absorbed thyroid doses in children might lead to a statistically detectable rise in the incidence of thyroid tumors. Significant non-radiation-related health disorders were found, and the accident had substantial psychological consequences in terms of anxiety and stress. The project concluded that the protective measures taken were too extreme, and that population relocation and foodstuff restrictions should have been less extensive

  20. Vague project start makes project success of outsourced software development projects uncertain

    OpenAIRE

    Savolainen, Paula

    2010-01-01

    peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...

  1. Project Planning and Implementation: Lessons Learned From the AQBMP Project

    National Research Council Canada - National Science Library

    1997-01-01

    ...). This NSRP report is funded as an addendum to the Air Quality Best Management Practices (AQBMP) project (N1 -944). The AQBMP project was completed using an intensive project planning process using a variety of quality management tools...

  2. Project manager attributes influencing project success in the South ...

    African Journals Online (AJOL)

    success criteria for building projects in Ghana and concluded that the “current and ... qualifications, profession, leadership style and project team ... and expectations of project management competence between ... 1.d. Sense of teamwork ...

  3. Managing project complexity : A study into adapting early project phases to improve project performance in large engineering projects

    NARCIS (Netherlands)

    Bosch-Rekveldt, M.G.C.

    2011-01-01

    Engineering projects become increasingly more complex and project complexity is assumed to be one of the causes for projects being delivered late and over budget. However, what this project complexity actually comprised of was unclear. To improve the overall project performance, this study focuses

  4. "Cheesy Pizza": The Pizza Project

    Science.gov (United States)

    Gallick, Barbara; Lee, Lisa

    2009-01-01

    A class of 3- to 5-year-old children in a midwestern child care center chose to study pizza restaurants as a group project. This article discusses how the project evolved, describes the three phases of the project, and provides the teachers' reflections on the project. Photos taken during the project and children's sketches are included. (Contains…

  5. Relationships and project marketing success

    DEFF Research Database (Denmark)

    Skaates, Maria Anne; Tikkanen, Henrikki; Lindblom, Jarno

    2002-01-01

    Project operations are a dominating mode of international business. Managing relationships and networks is crucial to project marketing success both at the level of the individual project and at the level of multiple projects. This article first defines key characteristics of project business, id...

  6. Project Management Using Modern Guidance, Navigation and Control Theory

    Science.gov (United States)

    Hill, Terry

    2010-01-01

    The idea of control theory and its application to project management is not new, however literature on the topic and real-world applications is not as readily available and comprehensive in how all the principals of Guidance, Navigation and Control (GN&C) apply. This paper will address how the fundamental principals of modern GN&C Theory have been applied to NASA's Constellation Space Suit project and the results in the ability to manage the project within cost, schedule and budget. A s with physical systems, projects can be modeled and managed with the same guiding principles of GN&C as if it were a complex vehicle, system or software with time-varying processes, at times non-linear responses, multiple data inputs of varying accuracy and a range of operating points. With such systems the classic approach could be applied to small and well-defined projects; however with larger, multi-year projects involving multiple organizational structures, external influences and a multitude of diverse resources, then modern control theory is required to model and control the project. The fundamental principals of G N&C stated that a system is comprised of these basic core concepts: State, Behavior, Control system, Navigation system, Guidance and Planning Logic, Feedback systems. The state of a system is a definition of the aspects of the dynamics of the system that can change, such as position, velocity, acceleration, coordinate-based attitude, temperature, etc. The behavior of the system is more of what changes are possible rather than what can change, which is captured in the state of the system. The behavior of a system is captured in the system modeling and if properly done, will aid in accurate system performance prediction in the future. The Control system understands the state and behavior of the system and feedback systems to adjust the control inputs into the system. The Navigation system takes the multiple data inputs and based upon a priori knowledge of the input

  7. Understanding Applications of Project Planning and Scheduling in Construction Projects

    OpenAIRE

    AlNasseri, Hammad Abdullah

    2015-01-01

    Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholders’ needs. However, there is increasing concern about whether know-how effectively improves understanding of underlying theories of project management processes for construction organizations and their project managers. Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance, but many worldwide constru...

  8. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Tamara Gvozdenovic

    2008-03-01

    Full Text Available One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviations from the previously set quality standards. Basic processes of project quality management are: quality planning, quality assurance and quality control.

  9. Prioritising Project Scope Definition Elements in Public Building Projects

    Directory of Open Access Journals (Sweden)

    Mohammed K Fageha

    2014-09-01

    Full Text Available A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI as a basis, the study uses analytical network process (ANP technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage. Keywords: Project scope definition, pre-project planning, prioritising, public building projects, Saudi Arabia, Analytical Network Process (ANP

  10. Project Plan Remote Target Fabrication Refurbishment Project

    International Nuclear Information System (INIS)

    Bell, Gary L.; Taylor, Robin D.

    2009-01-01

    was received in July 2009 under the Remote Target Fabrication Refurbishment Task of the Enhanced Utilization of Isotope Facilities project (Project Identification Code 2005230) funded by the American Recovery and Reinvestment Act of 2009. The goal of this project is to recover the capability to produce 4-5 curium targets for the irradiation period starting with HFIR cycle 427, currently scheduled to begin 2/17/10. Assuming success, the equipment would then be used to fabricate 6-7 additional targets to hold for the next irradiation campaign specified by the program. Specific objectives are the return to functionality of the Cubicle 3 Pellet Fabrication Line; Cubicle 2 Target Assembly equipment; and Cubicle 1 Target Inspection and Final Assembly system.

  11. Averaged 30 year climate change projections mask opportunities for species establishment

    Science.gov (United States)

    Serra-Diaz, Josep M.; Franklin, Janet; Sweet, Lynn C.; McCullough, Ian M.; Syphard, Alexandra D.; Regan, Helen M.; Flint, Lorraine E.; Flint, Alan L.; Dingman, John; Moritz, Max A.; Redmond, Kelly T.; Hannah, Lee; Davis, Frank W.

    2016-01-01

    Survival of early life stages is key for population expansion into new locations and for persistence of current populations (Grubb 1977, Harper 1977). Relative to adults, these early life stages are very sensitive to climate fl uctuations (Ropert-Coudert et al. 2015), which often drive episodic or ‘event-limited’ regeneration (e.g. pulses) in long-lived plant species (Jackson et al. 2009). Th us, it is diffi cult to mechanistically associate 30-yr climate norms to dynamic processes involved in species range shifts (e.g. seedling survival). What are the consequences of temporal aggregation for estimating areas of potential establishment? We modeled seedling survival for three widespread tree species in California, USA ( Quercus douglasii, Q. kelloggii , Pinus sabiniana ) by coupling a large-scale, multi-year common garden experiment to high-resolution downscaled grids of climatic water defi cit and air temperature (Flint and Flint 2012, Supplementary material Appendix 1). We projected seedling survival for nine climate change projections in two mountain landscapes spanning wide elevation and moisture gradients. We compared areas with windows of opportunity for seedling survival – defi ned as three consecutive years of seedling survival in our species, a period selected based on studies of tree niche ontogeny (Supplementary material Appendix 1) – to areas of 30-yr averaged estimates of seedling survival. We found that temporal aggregation greatly underestimated the potential for species establishment (e.g. seedling survival) under climate change scenarios.

  12. The wind forecasting improvement project. Description and results from the Southern study region

    Energy Technology Data Exchange (ETDEWEB)

    Freedman, Jeffrey [AWS Truepower LLC, Albany, NY (United States); Benjamin, Stan; Wilczak, James [National Oceanic and Atmospheric Administration, Washington, DC and Boulder, CO (United States)] [and others

    2012-07-01

    The Wind Forecasting Improvement Project (WFIP) is a multi-year U.S. Department of Energy (DOE)/National Oceanographic and Atmospheric Administration (NOAA) sponsored study whose main purpose is to demonstrate the scientific and economic benefits of additional atmospheric observations and model enhancements on wind energy production forecasts. WFIP covers two geographical regions of the U.S.: (1) the upper Great Plains, or Northern Study Area, and (2) most of Texas-the Southern Study Area. The Southern campaign is being led by AWS Truepower LLC, and includes a team of private, government, and academic partners with collective experience and expertise in all facets required to ensure a successful completion of the project. In addition presenting a summary of the state-of-the-art forecasting techniques used and phenomena-based analysis mentioned above, a brief synopsis of how ''lessons learned'' from the WFIP Southern Study Area can be articulated and applied to other wind resource regions will be described. (orig.)

  13. SAT project introduction: management issues

    International Nuclear Information System (INIS)

    Kazennov, A.Yu.

    1998-01-01

    Management issues of introducing SAT Project include main objectives and expectations; SAT goal and management; major phases of SAT implementation; project quality assurance; SAT based training system and procedures; role of the project team qualifications

  14. Energy Efficiency Project Development

    Energy Technology Data Exchange (ETDEWEB)

    IUEP

    2004-03-01

    The International Utility Efficiency Partnerships, Inc. (IUEP) has been a leader among the industry groups that have supported voluntary initiatives to promote international energy efficiency projects and address global climate change. The IUEP maintains its leadership by both supporting international greenhouse gas (GHG) reduction projects under the auspices of the U.S. Department of Energy (DOE) and by partnering with U.S. and international organizations to develop and implement strategies and specific energy efficiency projects. The goals of the IUEP program are to (1) provide a way for U.S. industry to maintain a leadership role in international energy efficiency infrastructure projects; (2) identify international energy project development opportunities to continue its leadership in supporting voluntary market-based mechanisms to reduce GHG emissions; and (3) demonstrate private sector commitment to voluntary approaches to global climate issues. The IUEP is dedicated to identifying, promoting, managing, and assisting in the registration of international energy efficiency projects that result in demonstrated voluntary reductions of GHG emissions. This Final Technical Report summarizes the IUEP's work in identifying, promoting, managing, and assisting in development of these projects and IUEP's effort in creating international cooperative partnerships to support project development activities that develop and deploy technologies that (1) increase efficiency in the production, delivery and use of energy; (2) increase the use of cleaner, low-carbon fuels in processing products; and (3) capture/sequester carbon gases from energy systems. Through international cooperative efforts, the IUEP intends to strengthen partnerships for energy technology innovation and demonstration projects capable of providing cleaner energy in a cost-effective manner. As detailed in this report, the IUEP met program objectives and goals during the reporting period January 1

  15. California Hydrogen Infrastructure Project

    Energy Technology Data Exchange (ETDEWEB)

    Heydorn, Edward C

    2013-03-12

    Air Products and Chemicals, Inc. has completed a comprehensive, multiyear project to demonstrate a hydrogen infrastructure in California. The specific primary objective of the project was to demonstrate a model of a real-world retail hydrogen infrastructure and acquire sufficient data within the project to assess the feasibility of achieving the nation's hydrogen infrastructure goals. The project helped to advance hydrogen station technology, including the vehicle-to-station fueling interface, through consumer experiences and feedback. By encompassing a variety of fuel cell vehicles, customer profiles and fueling experiences, this project was able to obtain a complete portrait of real market needs. The project also opened its stations to other qualified vehicle providers at the appropriate time to promote widespread use and gain even broader public understanding of a hydrogen infrastructure. The project engaged major energy companies to provide a fueling experience similar to traditional gasoline station sites to foster public acceptance of hydrogen. Work over the course of the project was focused in multiple areas. With respect to the equipment needed, technical design specifications (including both safety and operational considerations) were written, reviewed, and finalized. After finalizing individual equipment designs, complete station designs were started including process flow diagrams and systems safety reviews. Material quotes were obtained, and in some cases, depending on the project status and the lead time, equipment was placed on order and fabrication began. Consideration was given for expected vehicle usage and station capacity, standard features needed, and the ability to upgrade the station at a later date. In parallel with work on the equipment, discussions were started with various vehicle manufacturers to identify vehicle demand (short- and long-term needs). Discussions included identifying potential areas most suited for hydrogen fueling

  16. Instrument validation project

    International Nuclear Information System (INIS)

    Reynolds, B.A.; Daymo, E.A.; Geeting, J.G.H.; Zhang, J.

    1996-06-01

    Westinghouse Hanford Company Project W-211 is responsible for providing the system capabilities to remove radioactive waste from ten double-shell tanks used to store radioactive wastes on the Hanford Site in Richland, Washington. The project is also responsible for measuring tank waste slurry properties prior to injection into pipeline systems, including the Replacement of Cross-Site Transfer System. This report summarizes studies of the appropriateness of the instrumentation specified for use in Project W-211. The instruments were evaluated in a test loop with simulated slurries that covered the range of properties specified in the functional design criteria. The results of the study indicate that the compact nature of the baseline Project W-211 loop does not result in reduced instrumental accuracy resulting from poor flow profile development. Of the baseline instrumentation, the Micromotion densimeter, the Moore Industries thermocouple, the Fischer and Porter magnetic flow meter, and the Red Valve Pressure transducer meet the desired instrumental accuracy. An alternate magnetic flow meter (Yokagawa) gave nearly identical results as the baseline fischer and Porter. The Micromotion flow meter did not meet the desired instrument accuracy but could potentially be calibrated so that it would meet the criteria. The Nametre on-line viscometer did not meet the desired instrumental accuracy and is not recommended as a quantitative instrument although it does provide qualitative information. The recommended minimum set of instrumentation necessary to ensure the slurry meets the Project W-058 acceptance criteria is the Micromotion mass flow meter and delta pressure cells

  17. Pedagogy of stereographic projection

    Science.gov (United States)

    Blenkinsop, Tom

    1999-05-01

    Three sorts of problem are encountered by students learning stereographic projection. Lack of familiarity with compass directions and with the specification of planar and linear orientations is the most fundamental problem. The second problem is one of poor visualisation which prohibits the correct understanding of the principles and practice of projection, although students can sometimes perform remarkably well on certain exercises without this understanding. A third problem is a lack of interest or appreciation of the usefulness of the technique. A solution to the first problem is to provide a thorough grounding in compass directions, and concepts of strike, dip, dip direction, plunge and plunge bearing immediately before teaching stereographic projection. Visual aids, such as a transparent hemisphere to represent half of the projection sphere, and a large stereonet, are helpful for visualisation. Estimation and sketching exercises help to develop an understanding of the geometry of projection. Computer-aided teaching and plotting is recommended after an introduction to manual techniques. Interest can be stimulated through the use of exercises based on real geological maps.

  18. RadGenomics project

    Energy Technology Data Exchange (ETDEWEB)

    Iwakawa, Mayumi; Imai, Takashi; Harada, Yoshinobu [National Inst. of Radiological Sciences, Chiba (Japan). Frontier Research Center] [and others

    2002-06-01

    Human health is determined by a complex interplay of factors, predominantly between genetic susceptibility, environmental conditions and aging. The ultimate aim of the RadGenomics (Radiation Genomics) project is to understand the implications of heterogeneity in responses to ionizing radiation arising from genetic variation between individuals in the human population. The rapid progression of the human genome sequencing and the recent development of new technologies in molecular genetics are providing us with new opportunities to understand the genetic basis of individual differences in susceptibility to natural and/or artificial environmental factors, including radiation exposure. The RadGenomics project will inevitably lead to improved protocols for personalized radiotherapy and reductions in the potential side effects of such treatment. The project will contribute to future research into the molecular mechanisms of radiation sensitivity in humans and will stimulate the development of new high-throughput technologies for a broader application of biological and medical sciences. The staff members are specialists in a variety of fields, including genome science, radiation biology, medical science, molecular biology, and informatics, and have joined the RadGenomics project from various universities, companies, and research institutes. The project started in April 2001. (author)

  19. The Astronomy Genealogy Project

    Science.gov (United States)

    Tenn, Joseph S.

    2014-01-01

    The Astronomy Genealogy Project, to be known as AstroGen, will list as many as possible of the world's astronomers with their academic parents (aka thesis advisors) and enable the reader to trace both academic ancestors and descendants. It will be very similar to the highly successful Mathematics Genealogy Project (MGP), available at http://genealogy.math.ndsu.nodak.edu. The MGP, which has been in operation since 1996, now contains the names of about 170,000 "mathematicians." These include many physicists and astronomers, as well as practitioners of related sciences. Mitchel Keller, the director of the MGP, has generously shared the software used in that project, and the American Astronomical Society (AAS) will host AstroGen, a project of the Historical Astronomy Division, on its website. We expect to start seeking entries soon, depending on the availability of computational assistance from the AAS IT department. We are seeking volunteers to help run the project. If you are interested, please contact me at joe.tenn@sonoma.edu.

  20. The ARCHER Project

    International Nuclear Information System (INIS)

    Knol, S.; Roelofs, F.; Fütterer, M.A.; Kohtz, N.; Laurie, M.; Buckthorpe, D.; Scheuermann, W.

    2014-01-01

    The European HTR R&D project ARCHER (Advanced High-Temperature Reactors for Cogeneration of Heat and Electricity R&D) builds on a solid HTR technology foundation in Europe, established through former national UK and German HTR programs and in European programs. ARCHER runs from 2011 to 2015 and targets selected HTR R&D subjects that would specifically support demonstration, with a focus on experimental effort. In line with the R&D and deployment strategy of the European Sustainable Nuclear Energy Technology Platform (SNETP) ARCHER contributes to maintaining, strengthening and expanding the HTR knowledge base in Europe to lay the foundations for demonstration of nuclear cogeneration with HTR systems. The project consortium encompasses conventional and nuclear industry, utilities, Technical Support Organizations, R&D organizations and academia. ARCHER shares results with international partners in the Generation IV International Forum and collaborates directly with related projects in the US, China, Japan, the Republic of Korea and South Africa. The ARCHER project is in its final year, and the paper comprises an overview of the achievements thus far for the different Sub Projects. (author)

  1. The Innavik hydroelectric project

    Energy Technology Data Exchange (ETDEWEB)

    St-Pierre, S.; McNeil, E.; Gacek, J. [RSW Inc., Montreal, PQ (Canada); Atagotaaluk, E. [Pituvik Landholding Corp., Nunavik, PQ (Canada); Henderson, C. [Lumos Energy, Ottawa, ON (Canada)

    2009-07-01

    The village of Inukjuak in northern Quebec is not connected to the main electrical grid. This remote village is one of 14 Inuit communities in the Nunavik administrative region where electricity is generated by diesel thermal power plants under the direction of Hydro-Quebec Distribution's Isolated Grid subdivision. The heating of water and buildings is supplied by heavy fuel-oil. A compensation program for the price of fuel-oil is applied in the community. This presentation discussed the need for developing renewable energy sources in order to respond to the energy demands of isolated grids. The community of Inukjuak plans on developing the water resources of the Inukjuak River in order to produce hydroelectricity and reduce the use of diesel fuel. Several possible development sites were identified. The project will contribute to a reduction in energy costs while reducing greenhouse gas emissions. Revenues generated from the power plant will help the village in their economic development by enabling the completion of various community projects. The sustainable development approach taken for the project was discussed and the project's main technical, environmental and social issues were identified. The project is expected to reduce the production of an estimated 8 tons of carbon dioxide emissions by 2011 and nearly 15 tons after 10 years of operation.

  2. RadGenomics project

    International Nuclear Information System (INIS)

    Iwakawa, Mayumi; Imai, Takashi; Harada, Yoshinobu

    2002-01-01

    Human health is determined by a complex interplay of factors, predominantly between genetic susceptibility, environmental conditions and aging. The ultimate aim of the RadGenomics (Radiation Genomics) project is to understand the implications of heterogeneity in responses to ionizing radiation arising from genetic variation between individuals in the human population. The rapid progression of the human genome sequencing and the recent development of new technologies in molecular genetics are providing us with new opportunities to understand the genetic basis of individual differences in susceptibility to natural and/or artificial environmental factors, including radiation exposure. The RadGenomics project will inevitably lead to improved protocols for personalized radiotherapy and reductions in the potential side effects of such treatment. The project will contribute to future research into the molecular mechanisms of radiation sensitivity in humans and will stimulate the development of new high-throughput technologies for a broader application of biological and medical sciences. The staff members are specialists in a variety of fields, including genome science, radiation biology, medical science, molecular biology, and informatics, and have joined the RadGenomics project from various universities, companies, and research institutes. The project started in April 2001. (author)

  3. Distributed Project Work

    DEFF Research Database (Denmark)

    Borch, Ole; Kirkegaard, B.; Knudsen, Morten

    1998-01-01

    Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work in a distr......Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work...... in a distributed fashion over the Internet needs more attention to the interaction protocol since the physical group room is not existing. The purpose in this paper is to develop a method for online project work by using the product: Basic Support for Cooperative Work (BSCV). An analysis of a well-proven protocol...... for information exchange in the traditional project environment is performed. A group of teachers and a student group using small project examples test the method. The first test group used a prototype for testing and found the new activity synchronization difficult to adapt, so the method was finally adjusted...

  4. Three domains of project organising

    OpenAIRE

    Winch, Graham M.

    2014-01-01

    It has become axiomatic in research on project organising that projects are temporary organisations. Yet there are a number of challenges to this axiom: research on matrix organisation, the embeddedness of projects in project ecologies, and projectification all emphasise the relationship of the project to permanent organisations. Similarly, research on project-based firms and owner organisations which are relatively permanent challenges this axiom. This paper develops a conceptual framework w...

  5. Guidelines for Automation Project Execution

    OpenAIRE

    Takkinen, Heidi

    2011-01-01

    The purpose of this Master’s thesis was to create instructions for executing an automation project. Sarlin Oy Ab needed directions on how to execute an automation project. Sarlin is starting up a new business area offering total project solutions for customers. Sarlin focuses on small and minor automation projects on domestic markets. The thesis represents issues related to project execution starting from the theory of the project to its kick-off and termination. Site work is one importan...

  6. Statistical Techniques for Project Control

    CERN Document Server

    Badiru, Adedeji B

    2012-01-01

    A project can be simple or complex. In each case, proven project management processes must be followed. In all cases of project management implementation, control must be exercised in order to assure that project objectives are achieved. Statistical Techniques for Project Control seamlessly integrates qualitative and quantitative tools and techniques for project control. It fills the void that exists in the application of statistical techniques to project control. The book begins by defining the fundamentals of project management then explores how to temper quantitative analysis with qualitati

  7. The design explorer project

    DEFF Research Database (Denmark)

    Pejtersen, Annelise Mark; Sonnenwald, Diane H.; Buur, Jacob

    1997-01-01

    the 'Design Explorer' research project whose goal is to specify requirements for an information system that will effectively help design team members from different domains and organizational cultures to locate and utilize diverse information sources and interact more effectively throughout the design process....... The project introduces a new approach to support of design; instead of design guidelines, support is given by creating a transparent information environment in which designers can navigate freely according to their individual preferences. The project is based on a framework that structures the dimensions......, or categories, of domain information which need to be available for a system or product designer/design team in order to determine the characteristics of the artefact, or object of design. These dimensions include information about the different work domains in which the product plays a role during its lifetime...

  8. Alligator Rivers analogue project

    International Nuclear Information System (INIS)

    Duerden, P.

    1990-01-01

    Australian Nuclear Science and Technology Organization has extensively evaluated uranium ore bodies in the Alligator Rivers Uranium Province in Australia as analogues of radioactive waste repositories. The work was extended for a three-year program as an international project based on the Koongarra uranium deposit and sponsored by the OECD Nuclear Energy Agency. The technical program comprises six major sub-projects involving modelling and experimental work: modelling of radionuclide migration; hydrogeology of the Koongarra uranium deposit; uranium/thorium series disequilibria studies; groundwater and colloid studies; fission product studies; transuranic nuclide studies; an outline of the technical programs and a summary of progress in the technical sub-projects is given. This is followed by a series of technical reports which briefly describe current research tasks, and which have been separately indexed

  9. The Manhattan project

    International Nuclear Information System (INIS)

    Alexieff, A.

    2010-01-01

    The author reports the history of the Manhattan project which was launched in 1942 with the objective of building an A bomb at any price and as soon as possible. This lead to the fabrication of two types of bomb, one using uranium in gun mode, and the other using plutonium in implosion mode. The author recalls the creation of different scientific and nuclear institutions, the development of several installations (Los Alamos, Hanford, Oak Ridge). He outlines the project secrecy (President Truman did not know anything about it when he became president), and recalls the final tests, the bombing of Hiroshima and Nagasaki, and the last moment of the Manhattan Project after the end of the war. In conclusion, he notices that this nuclear era allowed a direct confrontation to be avoided despite the several crises which occurred during about two decades after the war

  10. Breckinridge Project, initial effort

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    1982-09-01

    Report III, Volume 1 contains those specifications numbered A through J, as follows: General Specifications (A); Specifications for Pressure Vessels (C); Specifications for Tanks (D); Specifications for Exchangers (E); Specifications for Fired Heaters (F); Specifications for Pumps and Drivers (G); and Specifications for Instrumentation (J). The standard specifications of Bechtel Petroleum Incorporated have been amended as necessary to reflect the specific requirements of the Breckinridge Project, and the more stringent specifications of Ashland Synthetic Fuels, Inc. These standard specifications are available to the Initial Effort (Phase Zero) work performed by all contractors and subcontractors. Report III, Volume 1 also contains the unique specifications prepared for Plants 8, 15, and 27. These specifications will be substantially reviewed during Phase I of the project, and modified as necessary for use during the engineering, procurement, and construction of this project.

  11. Enhanced project management tool

    Science.gov (United States)

    Hsu, Chen-Jung (Inventor); Patel, Hemil N. (Inventor); Maluf, David A. (Inventor); Moh Hashim, Jairon C. (Inventor); Tran, Khai Peter B. (Inventor)

    2012-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.

  12. Kryolize - KT Fund Project

    CERN Multimedia

    CERN. Geneva

    2016-01-01

    Safety standards and best practices do exist in the field of cryogenics but, as in most domains, they are generally inserted in a few ‘envelope’ cases commonly used in the industry, whereas applicability to the particularity of research facilities are not fully tailored to its needs. The main objective in these cases is to find a harmonised approach, based on lessons learnt and scientific knowledge. The Kryolize Project was created in order to produce tools with a harmonized approach to size pressure relief devices for cryogenic applications. In view of disseminating such tools to other institutes and industrial partners, the project was submitted to CERN’s KT Fund committee. This talk will focus on the process and deliverables of the KT-Funded Kryolize project, including the method on how to cope with the sizing of pressure relief devices and the R&D collaboration agreement between CERN and Karlsruhe Institute of Technology for an experimental programme.

  13. The international Chernobyl project

    International Nuclear Information System (INIS)

    Gonzalez, A.J.

    1992-01-01

    The findings of the International Chernobyl Project are summarized herewith. The project focused on four key issues related to the radiological consequences of the Chernobyl accident which are of concern to the population and policy makers: the true extent of the current contamination in inhabited areas of Belarus, Russia and the Ukraine; the past, current and future radiation exposure of the population; the actual and potential health effects; and the adequacy or measures being taken to protect the public. The project findings are expected to contribute towards alleviating the consequences of the accident by presenting factual information to allow future policy and worldwide assistance to be channelled to where it is most needed and where it can be best used. (author)

  14. Virtual Project Teams

    DEFF Research Database (Denmark)

    Bjørn, Pernille

    technology in six real-life virtual teams, two in industry and four in education, applying interpretative research and action research methods. Two main lines of investigation are pursued: the first involves an examination of the organisational issues related to groupware adaptation in virtual project teams......, professional disciplines, time differences and technology. This thesis comprises a general introduction, referred to as the summary report, and seven research papers, which deal in detail with the results and findings of the empirical cases. The summary report provides a general introduction to the research......, while the second looks at the social context and practices of virtual project teams. Two of the key findings are 1) that the process of groupware adaptation by virtual project teams can be viewed as a process of expanding and aligning the technological frames of the participants, which includes mutual...

  15. HIRFL-CSR project

    International Nuclear Information System (INIS)

    Zhan, W.L.; Xia, J.W.; Wei, B.W.; Yuan, Y.J.; Zhao, H.W.; Man, K.T.; Dang, J.R.; Yuan, P.; Gao, D.Q.; Yang, X.T.; Song, M.T.; Zhang, W.Z.; Xiao, G.Q.; Cai, X.H.; Tang, J.Y.; Qiao, W.M.; Yang, X.D.; Wang, Y.F.

    2001-01-01

    HIRFL-CSR, the project that was proposed to upgrade the HIRFL facility, is a multifunctional Cooling Storage Ring (CSR) system, consisting of a main ring (CSRm) and an experimental ring (CSRe). The heavy ion beams from the HIRFL will be injected, accumulated, cooled and accelerated to high energy in the CSRm, then fast-extracted to produce radioactive ion beams (RIB), highly-charged stage ions, or slow-extracted to do experiment. The secondary beams will be accepted by CSRe and used for internal-target experiments of the high sensitive and high precision spectroscopy with cool beam. CSR project was started in end of 1999 and finish in the end of 2004. The period from beginning of 2000 to the summer of 2001 is the time for the building construction, fabrication design, prototype experiments. In this paper, the outline and status of the project will be reported

  16. Sun light European Project

    Science.gov (United States)

    Soubielle, Marie-Laure

    2015-04-01

    2015 has been declared the year of light. Sunlight plays a major role in the world. From the sunbeams that heat our planet and feed our plants to the optical analysis of the sun or the modern use of sun particles in technologies, sunlight is everywhere and it is vital. This project aims to understand better the light of the Sun in a variety of fields. The experiments are carried out by students aged 15 to 20 in order to share their discoveries with Italian students from primary and secondary schools. The experiments will also be presented to a group of Danish students visiting our school in January. All experiments are carried out in English and involve teams of teachers. This project is 3 folds: part 1: Biological project = what are the mechanisms of photosynthesis? part 2: Optical project= what are the components of sunlight and how to use it? part 3: Technical project= how to use the energy of sunlight for modern devices? Photosynthesis project Biology and English Context:Photosynthesis is a process used by plants and other organisms to convert light energy, normally from the Sun, into chemical energy that can later fuel the organisms' activities. This chemical energy is stored in molecules which are synthesized from carbon dioxide and water. In most cases, oxygen is released as a waste product. Most plants perform photosynthesis. Photosynthesis maintains atmospheric oxygen levels and supplies all of the organic compounds and most of the energy necessary for life on Earth. Outcome: Our project consists in understanding the various steps of photosynthesis. Students will shoot a DVD of the experiments presenting the equipments required, the steps of the experiments and the results they have obtained for a better understanding of photosynthesis Digital pen project Electricity, Optics and English Context: Sunlight is a complex source of light based on white light that can be decomposed to explain light radiations or colours. This light is a precious source to create

  17. Photovoltaic demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Gillett, W B; Hacker, R J; Kaut, W [eds.

    1991-01-01

    This book, the proceedings of the fourth PV-Contractors' Meeting organized by the Commission of the European Communities, Directorate-General for Energy, held at Brussels on 21 and 22 November 1989, provides an overview of the photovoltaic demonstration projects which have been supported in the framework of the Energy Demonstration Program since 1983. It includes reports by each of the contractors who submitted proposals in 1983, 1984, 1985 and 1986, describing progress with their projects. Summaries of the discussions held at the meeting, which included contractors whose projects were submitted in 1987, are also presented. The different technologies which are being demonstrated concern the modules, the cabling of the array, structure design, storage strategy and power conditioning. The various applications include desalination, communications, dairy farms, water pumping, and warning systems. Papers have been processed separately for inclusion on the data base.

  18. Kintyre uranium project

    International Nuclear Information System (INIS)

    1988-04-01

    This project book is designed to outline the nature of the Kintyre uranium project for those associated with the project as employees, contractors and consultants and others. It explains why Canning Resources Pty Limited and CRA Exploration believe this resource and other resources in the Rundall region should be developed. It also outlines the environmental and social issues involved and the proposed means of addressing those issues. The Kintyre resource and associated areas of geological prospectivity are located in the Rundall region on the edge of the Great Sandy Desert, in the East Pilbara region of Western Australia. Canning Resources with CRA Exploration has spent over $20 million in the past two years in intensive drilling and exploration efforts in the Kintyre area and intends to spend a further $10 million in 1988. Investigations so far reveal that the resource has features which make it competitive with the best uranium mines in the world

  19. The Colibri Project

    DEFF Research Database (Denmark)

    Lopez, Jose Manuel Guterrez Lopez; Frick, Jan; Kirikova, Marite

    2015-01-01

    Colibri (Collaboration and Innovation for Better, Personalized and IT-Supported Teaching) is a three year project co-funded by the Erasmus + Strategic Partnership, starting in 2014. The project is being carried out by seven academic, two industrial, and one governmental organisation partners from...... eight different countries [1]. The main objective of the project is enhancing the quality and relevance of the learning offer in education by developing and systematically testing new and innovative approaches, and by supporting the dissemination and spreading of best practices. This is in the focus...... course on Future Internet Opportunities is part of the Living Lab, followed by 28 students and given by more than 10 different teachers. Both the teachers and the students represent different fields within computer science, electrical engineering, telecommunications, business informatics, management...

  20. Radiology Architecture Project Primer.

    Science.gov (United States)

    Sze, Raymond W; Hogan, Laurie; Teshima, Satoshi; Davidson, Scott

    2017-12-19

    The rapid pace of technologic advancement and increasing expectations for patient- and family-friendly environments make it common for radiology leaders to be involved in imaging remodel and construction projects. Most radiologists and business directors lack formal training in architectural and construction processes but are expected to play significant and often leading roles in all phases of an imaging construction project. Avoidable mistakes can result in significant increased costs and scheduling delays; knowledgeable participation and communication can result in a final product that enhances staff workflow and morale and improves patient care and experience. This article presents practical guidelines for preparing for and leading a new imaging architectural and construction project. We share principles derived from the radiology and nonradiology literature and our own experience over the past decade completely remodeling a large pediatric radiology department and building a full-service outpatient imaging center. Copyright © 2017 American College of Radiology. Published by Elsevier Inc. All rights reserved.