WorldWideScience

Sample records for kw test plant

  1. 1000kW on-site PAFC power plant development and demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Satomi, Tomohide; Koike, Shunichi [Phosphoric Acid Fuel Cell Technology Research Association (PAFC-TRA), Osaka (Japan); Ishikawa, Ryou [New Energy and Industrial Technology Development Organization (NEDO), Tokyo (Japan)

    1996-12-31

    Phosphoric Acid Fuel Cell Technology Research Association (PAFC-TRA) and New Energy and Industrial Technology Development Organization (NEDO) have been conducting a joint project on development of a 5000kW urban energy center type PAFC power plant (pressurized) and a 1000kW on-site PAFC power plant (non-pressurized). The objective of the technical development of 1000kW on-site PAFC power plant is to realize a medium size power plant with an overall efficiency of over 70% and an electrical efficiency of over 36%, that could be installed in a large building as a cogeneration system. The components and system integration development work and the plant design were performed in 1991 and 1992. Manufacturing of the plant and installation at the test site were completed in 1994. PAC test was carried out in 1994, and generation test was started in January 1995. Demonstration test is scheduled for 1995 and 1996.

  2. Development of a 200kW multi-fuel type PAFC power plant

    Energy Technology Data Exchange (ETDEWEB)

    Take, Tetsuo; Kuwata, Yutaka; Adachi, Masahito; Ogata, Tsutomu [NTT Integrated Information & Energy System Labs., Tokyo (Japan)

    1996-12-31

    Nippon Telegraph and Telephone Corporation (NFT) has been developing a 200 kW multi-fuel type PAFC power plant which can generate AC 200 kW of constant power by switching fuel from pipeline town gas to liquefied propane gas (LPG) and vice versa. This paper describes the outline of the demonstration test plant and test results of its fundamental characteristics.

  3. Operation result of 40kW class MCFC pilot plant

    Energy Technology Data Exchange (ETDEWEB)

    Saitoh, H.; Hatori, S.; Hosaka, M.; Uematsu, H. [Ishikawajima-Harima Heavy Industries Co., Ltd., Tokyo (Japan)

    1996-12-31

    Ishikawajima-Harima Heavy Industries Co., Ltd. developed unique Molten Carbonate Fuel Cell (MCFC) system based on our original concept. To demonstrate the possibility of this system, based on MCFC technology of consigned research from New Energy and Industrial Technology Development Organization (NEDO) in Japan, we designed 40kW class MCFC pilot plant which had all equipments required as a power plant and constructed in our TO-2 Technical Center. This paper presents the test results of the plant.

  4. Europe's largest solar thermal power plant. [200 kw thermal output supplemented by two 10-kw windmills

    Energy Technology Data Exchange (ETDEWEB)

    Bossel, U

    1976-03-01

    An overview is given over the solar heating plant which has recently been commissioned in the Camargue (France). This is the largest plant in Europe, with a mean heat output of about 200 kW, for the production of thermal energy from solar energy. The plant consists of 108 parabolic collectors (200 sq. metres) and 48 flat collectors (110 sq. metres). Two windmills with outputs of 10 kW each complete the system. The heat energy produced by the solar collectors is given up to 3 different stores, which in turn are connected to various consumers.

  5. 1000kW phosphoric acid fuel cell power plant. Outline of the plant

    Energy Technology Data Exchange (ETDEWEB)

    Shinobe, Kenji; Suzuki, Kazuo; Kaneko, Hideo

    1988-02-10

    The outline of the 1000KW phosphoric acid fuel cell power plant, developed as part of the Moonlight plan, was described. The plant was composed of 4 stacks of 260KW DC output. They were devided into two train with 680V and 765A. The generation efficiency of the plant was 40% and more. Steam reforming of natural gas was used. As the fuel, fuel cell exhaust gas was used in composition with the natural gas. The DC-AC inverter had an efficiency of 96%. The capacity of hot water generator and demineralized water plant for cell cooling were 2t/h and 1.6t/h, respectively, and air-system was incorporated. In September of 1987, the plant has succeeded in 1000KW power generation, and put in operation now. Under the 100% loaded condition, each cell had a voltage of 0.7V with little variation, and the current was 200mA/cm/sup 2/. No problems were found in cooling conditions and in the control of interpole differential pressure. The reformer has been operated for 1200h scince its commisioning, and had experiences of 100 times on start up-shut down operations, the reformer also indicated good performances in the gas compositions. The starting time of 8h and the load follow-up rate 10%/min remain as the subjects for shortening. DC-AC conversion was good. The concentration of NOx and the noise level satisfied the target values. (12 figs, 1 tab)

  6. Performance and life time test on a 5 kW SOFC system for distributed cogeneration

    Energy Technology Data Exchange (ETDEWEB)

    Barrera, Rosa; De Biase, Sabrina; Ginocchio, Stefano [Edison S.p.A, Via Giorgio La Pira, 2, 10028 Trofarello (Italy); Bedogni, Stefano; Montelatici, Lorenzo [Edison S.p.A, Foro Bonaparte 31, 20121 Milano (Italy)

    2008-06-15

    Edison R and D Centre is committed to test a wide range of commercial and prototypal fuel cell systems. The activities aim to evaluate the available state of the art of these technologies and their maturity for the relevant market. The laboratory is equipped with ad hoc test benches designed to study single cells, stacks and systems. The characterization of commercial and new generation PEMFC, also for high temperatures (160 C), together with the analysis of the behaviour of SOFC represent the core activities of the laboratory. On January 2007 a new 5 kW SOFC system supplied by Acumentrics was installed. The claimed electrical power output is 5 kW and thermal power is 3 kW. The aim of the test is the achievement of technical and economical assessment for future applications of small SOFC plants for distributed cogeneration. Performance and life time test of the system are shown. (author)

  7. Development of 20 kW input power coupler for 1.3 GHz ERL main linac. Component test at 30 kW IOT test stand

    International Nuclear Information System (INIS)

    Sakai, Hiroshi; Umemori, Kensei; Sakanaka, Shogo; Takahashi, Takeshi; Furuya, Takaaki; Shinoe, Kenji; Ishii, Atsushi; Nakamura, Norio; Sawamura, Masaru

    2009-01-01

    We started to develop an input coupler for a 1.3 GHz ERL superconducting cavity. Required input power is about 20 kW for the cavity acceleration field of 20 MV/m and the beam current of 100 mA in energy recovery operation. The input coupler is designed based on the STF-BL input coupler and some modifications are applied to the design for the CW 20 kW power operation. We fabricated input coupler components such as ceramic windows and bellows and carried out the high-power test of the components by using a 30 kW IOT power source and a test stand constructed for the highpower test. In this report, we mainly describe the results of the high-power test of ceramic window and bellows. (author)

  8. Room/corner tests of wall linings with 100/300 kW burner

    Science.gov (United States)

    M. A. Dietenberger; O. Grexa; R. H. White; M. S. Sweet; M. Janssens

    1995-01-01

    Six room/comer tests of common wall linings were conducted with gypsum-lined ceiling exposed to propane burning at 100 kW for 10 min followed by 300 kW for 10 min. This test protocol is an option provided by ISO 9705. The flashover event occurred at 1,000 kW rate of heat release within several seconds of observing flames out the doorway. The time to flashover of the...

  9. Gas liquid sampling for closed canisters in KW Basin - test plan

    International Nuclear Information System (INIS)

    Pitkoff, C.C.

    1995-01-01

    Test procedures for the gas/liquid sampler. Characterization of the Spent Nuclear Fuel, SNF, sealed in canisters at KW-Basin is needed to determine the state of storing SNF wet. Samples of the liquid and the gas in the closed canisters will be taken to gain characterization information. Sampling equipment has been designed to retrieve gas and liquid from the closed canisters in KW basin. This plan is written to outline the test requirements for this developmental sampling equipment

  10. 1000 Hours of Testing Completed on 10-kW Hall Thruster

    Science.gov (United States)

    Mason, Lee S.

    2001-01-01

    Between the months of April and August 2000, a 10-kW Hall effect thruster, designated T- 220, was subjected to a 1000-hr life test evaluation. Hall effect thrusters are propulsion devices that electrostatically accelerate xenon ions to produce thrust. Hall effect propulsion has been in development for many years, and low-power devices (1.35 kW) have been used in space for satellite orbit maintenance. The T-220, shown in the photo, produces sufficient thrust to enable efficient orbital transfers, saving hundreds of kilograms in propellant over conventional chemical propulsion systems. This test is the longest operation ever achieved on a high-power Hall thruster (greater than 4.5 kW) and is a key milestone leading to the use of this technology for future NASA, commercial, and military missions.

  11. Review of 2 kW grid connected LOPF tests in Nissum Bredning

    DEFF Research Database (Denmark)

    Margheritini, Lucia

    This report has been prepared by Per Resen and Aalborg University for the ForskVE project 10878: 2 kW grid connected LOPF test buoy. AAU has the role of reviewing and advise on the data analysis, besides compiling this report. The purpose of this project was to document the mechanical power...... production against a target power curve of a 2kW grid connected wave energy buoy in Nissum Bredning at Helligsø....

  12. Construction and start-up of a 250 kW natural gas fueled MCFC demonstration power plant

    Energy Technology Data Exchange (ETDEWEB)

    Figueroa, R.A.; Carter, J.; Rivera, R.; Otahal, J. [San Diego Gas & Electric, CA (United States)] [and others

    1996-12-31

    San Diego Gas & Electric (SDG&E) is participating with M-C Power in the development and commercialization program of their internally manifolded heat exchanger (IMHEX{reg_sign}) carbonate fuel cell technology. Development of the IMHEX technology base on the UNOCAL test facility resulted in the demonstration of a 250 kW thermally integrated power plant located at the Naval Air Station at Miramar, California. The members of the commercialization team lead by M-C Power (MCP) include Bechtel Corporation, Stewart & Stevenson Services, Inc., and Ishikawajima-Harima Heavy Industries (IHI). MCP produced the fuel cell stack, Bechtel was responsible for the process engineering including the control system, Stewart & Stevenson was responsible for packaging the process equipment in a skid (pumps, desulfurizer, gas heater, turbo, heat exchanger and stem generator), IHI produced a compact flat plate catalytic reformer operating on natural gas, and SDG&E assumed responsibility for plant construction, start-up and operation of the plant.

  13. Wind Turbine Generator System Acoustic Noise Test Report for the Gaia Wind 11-kW Wind Turbine

    Energy Technology Data Exchange (ETDEWEB)

    Huskey, A.

    2011-11-01

    This report details the acoustic noise test conducted on the Gaia-Wind 11-kW wind turbine at the National Wind Technology Center. The test turbine is a two- bladed, downwind wind turbine with a rated power of 11 kW. The test turbine was tested in accordance with the International Electrotechnical Commission standard, IEC 61400-11 Ed 2.1 2006-11 Wind Turbine Generator Systems -- Part 11 Acoustic Noise Measurement Techniques.

  14. Design and operational experience and testing of 50 kW/120 kHz oscillator for 3 MeV, 30 kW DC accelerator

    International Nuclear Information System (INIS)

    Srivastava, S.K.; Bakhtsingh, R.I.; Saroj, P.C.

    2011-01-01

    A 3 MeV, 30 kW dc industrial electron beam Accelerator is being developed at EBC, Kharghar, Navi Mumbai. The 3 MV dc is generated by parallel coupled voltage multiplier operating at 120 kHz. This requires an input voltage of 150 kV-0-150 kV at 120 kHz. This is achieved by 50 kW/120 kHz power oscillator in conjunction with a tuned air-core step-up transformer. Input primary voltage of 6 kV-0-6 kV at 120 kHz is generated by an oscillator using BW1121J2 water cooled triodes in push-pull Colpitts configuration. The tank circuit for the oscillator is formed by the secondary winding inductance of the step-up transformer and capacitance formed by RF feeder electrodes of the voltage multiplier column. Grid feedback for the oscillator is derived by arranging a set of electrodes in the feeder assembly in a capacitive divider configuration. The oscillator is operated in class-C mode with grid leak bias for better efficiency which also has the advantages of self-adjustment with varying load conditions. High power test has been conducted in a simulated test set-up on dummy load up to 30kW. Subsequently, the power oscillator has been tested with HV multiplier at 1MeV level satisfactorily. This paper describes the design, test results and operational experiences of the oscillator. (author)

  15. Design of 500kW grate fired test facility using CFD

    DEFF Research Database (Denmark)

    Rosendahl, Lasse Aistrup; Kær, Søren Knudsen; Jørgensen, K.

    2005-01-01

    A 500kW vibrating grate fired test facility for solid biomass fuels has been designed using numerical models including CFD. The CFD modelling has focussed on the nozzle layout and flowpatterns in the lower part of the furnace, and the results have established confidence in the chosen design...

  16. 3 kW Stirling engine for power and heat production

    DEFF Research Database (Denmark)

    Thorsen, Jan Eric; Bovin, Jonas Kabell; Carlsen, Henrik

    1996-01-01

    A new 3 kW Beta-type Stirling engine has been developed. The engine uses natural gas as fuel and is designed for use as a small combined heat and power plant for single family houses. The electrical power is supplied to the grid. The engine is made as a hermetic device, where the crank mechanism...... and the alternator are built into a pressurized crank casing. The engine produces 3 kW of shaft power corresponding to 2.4 kW of electric power. The heat input is 10 kW representing a shaft efficiency of 30% and an electric efficiency of 24%. Helium at 8 MPa mean pressure is used as the working gas. The crank...... for X-heads. A grease-lubricated needle and ball bearings are used in the kinematic crank mechanism. The burner includes an air preheater and a water jacket which makes it possible to utilize nearly all of the heat from the combustion gases. The performance of the engine has been tested as a function...

  17. Operating experience with a 250 kW el molten carbonate fuel cell (MCFC) power plant

    Science.gov (United States)

    Bischoff, Manfred; Huppmann, Gerhard

    The MTU MCFC program is carried out by a European consortium comprising the German companies MTU Friedrichshafen GmbH, Ruhrgas AG and RWE Energie AG as well as the Danish company Energi E2 S/A. MTU acts as consortium leader. The company shares a license and technology exchange agreement with Fuel Cell Energy Inc., Danbury, CT, USA (formerly Energy Research Corp., ERC). The program was started in 1990 and covers a period of about 10 years. The highlights of this program to date are: Considerable improvements regarding component stability have been demonstrated on laboratory scale. Manufacturing technology has been developed to a point which enables the consortium to fabricate the porous components on a 250 cm 2 scale. Several large area stacks with 5000-7660 cm 2 cell area and a power range of 3-10 kW have been tested at the facilities in Munich (Germany) and Kyndby (Denmark). These stacks have been supplied by FCE. As far as the system design is concerned it was soon realized that conventional systems do not hold the promise for competitive power plants. A system analysis led to the conclusion that a new innovative design approach is required. As a result the "Hot Module" system was developed by the consortium. A Hot Module combines all the components of a MCFC system operating at the similar temperatures and pressures into a common thermally insulated vessel. In August 1997 the consortium started its first full size Hot Module MCFC test plant at the facilities of Ruhrgas AG in Dorsten, Germany. The stack was assembled in Munich using 292 cell packages purchased from FCE. The plant is based on the consortium's unique and proprietary "Hot Module" concept. It operates on pipeline natural gas and was grid connected on 16 August 1997. After a total of 1500 h of operation, the plant was intentionally shut down in a controlled manner in April 1998 for post-test analysis. The Hot Module system concept has demonstrated its functionality. The safety concept has been

  18. Advancement, construction and testing of a 200 kW single-blade rotor. Weiterentwicklung, Bau und Erprobung eines 200 kW-Einblattrotors

    Energy Technology Data Exchange (ETDEWEB)

    Helms, L.; Knuenz, D.; Mickeler, S.; Ruehmann, H.R.; Stemme, H.; Wendt, H.; Wodarg, N.

    1991-03-01

    The research project promoted the design, construction, testing and demonstration of a medium-sized, isolated wind power plant with an output of ca. 200 kW and a rotor diameter of 25 m for electric power supplies to a greenhouse gardener's shop in East Frisia, Germany. The control of the connecting and disconnecting constant loads was to be developed for optimum utilization of the wind supply. The report discusses the project stages placing emphasis on the operational results. (BWI).

  19. Controlled Velocity Testing of an 8-kW Wind Turbine

    Energy Technology Data Exchange (ETDEWEB)

    Larwood, S.; Sencenbaugh, J.; Acker, B.

    2001-07-31

    This paper describes a case study of the controlled-velocity test of an 8-kW wind turbine. The turbine was developed in response to the U.S. Department of Energy's small wind turbine program. As background, the prototype development is discussed. The turbine mechanical and electrical components are described. The turbine was tested on a flatbed truck and driven down an airfield runway at constant relative wind speed. Horizontal furling was used to control over-speed. Various parameters were changed to determine their effects on furling. The testing showed that the machine had insufficient rotor offset for adequate furling. Also, a rotor resonance problem was discovered and remedied. Problems associated with taking the measurements made it difficult to determine if the truck test was a suitable method for code validation. However, qualitative observations gleaned from the testing justified the effort.

  20. Thermal power calibration of the TRIGA Mark I IPR-R1 reactor during the upgrading tests to 250 kW

    International Nuclear Information System (INIS)

    Mesquita, Amir Zacarias; Maretti, Fausto Junior; Rezende, Hugo Cesar

    2002-01-01

    This paper presents the results and the methodology used to calibrate the thermal power of the TRIGA MARK I IPR-R1 Reactor in CDTN, Belo Horizonte, Brazil. This calibration was realized during the operation tests carried out to allow the reactor power upgrade from the current 100 kW to 250 kW. The methodology consisted in the measurement of the inlet and outlet temperature and the water flow in the primary cooling loop. The thermal balance together with the thermal losses gave the thermal power. There were made three sequences of tests. The first rising of the thermal power was made with the usual configuration of the core (59 fuel elements). After the changing of the ion chambers position and the control rod and the increase of the number of fuels (63 fuel elements), a new evaluation of the thermal power was accomplished, having been obtained a thermal power of 234 kW, for an indication of 250 kW in the lineal channel. After the return of the core to the initial configuration (59 fuel elements), it took place a new test, getting back the reactor to the power level of 100 kW. (author)

  1. Test results of a 5 kW fully superconducting homopolar motor

    Energy Technology Data Exchange (ETDEWEB)

    Lee, J. K. [Woosuk University, Wanju (Korea, Republic of); Park, S. H.; Kim, Y.; Lee, S.; Joo, H. G.; Kim, W. S.; Choi, K. [Korea Polytechnic University,Siheong (Korea, Republic of); Hahm, S. Y. [Electrical Engineering and Science Research Institute,Seoul (Korea, Republic of)

    2013-05-15

    The superconducting Homopolar motor is manufactured and tested. Homopolar motor system is simple and solid as the field coil of the motor is fixed near the stator coil without rotating system. In this paper, a 5 kW fully superconducting homopolar motor which has high temperature superconducting armature and field coils is manufactured and tested in liquid nitrogen. The critical current test results of the used 2G superconducting wire, pancake coil for rotor winding and race-track coils for armature winding are reported. Also, the test result of rotating and operating performance is presented. The operating frequency is to be 5 Hz for low-speed rotating. The developed fully superconducting Homopolar motor is the world's first.

  2. Test results of a 5 kW fully superconducting homopolar motor

    International Nuclear Information System (INIS)

    Lee, J. K.; Park, S. H.; Kim, Y.; Lee, S.; Joo, H. G.; Kim, W. S.; Choi, K.; Hahm, S. Y.

    2013-01-01

    The superconducting Homopolar motor is manufactured and tested. Homopolar motor system is simple and solid as the field coil of the motor is fixed near the stator coil without rotating system. In this paper, a 5 kW fully superconducting homopolar motor which has high temperature superconducting armature and field coils is manufactured and tested in liquid nitrogen. The critical current test results of the used 2G superconducting wire, pancake coil for rotor winding and race-track coils for armature winding are reported. Also, the test result of rotating and operating performance is presented. The operating frequency is to be 5 Hz for low-speed rotating. The developed fully superconducting Homopolar motor is the world's first.

  3. Test result of 5 GHz, 500 kW CW prototype klystron for KSTAR LHCD system

    Energy Technology Data Exchange (ETDEWEB)

    Do, H., E-mail: heejindo@nfri.re.kr [Pohang University of Science and Technology, Pohang 790-784 (Korea, Republic of); Park, S. [Pohang University of Science and Technology, Pohang 790-784 (Korea, Republic of); Jeong, J.H.; Bae, Y.S.; Yang, H.L. [National Fusion Research Institute, Daejeon 350-333 (Korea, Republic of); Delpech, L.; Magne, R.; Hoang, G.T. [CEA, IRFM, F-13108 Saint-Paul-lez-Durance (France); Park, H.; Cho, M.H.; Namkung, W. [Pohang University of Science and Technology, Pohang 790-784 (Korea, Republic of)

    2011-10-15

    A 5 GHz LHCD system is being designed for current drive and profile modification necessary for AT mode and steady-state operation of the KSTAR tokamak. A prototype 500 kW CW klystron operating at 5 GHz was developed for the steady-state RF source. In this klystron, a multi-cell cavity is introduced to reduce cavity voltage and ohmic power loss. The klystron is designed with a triode system for optimization of gain, efficiency and beam control. The high voltage for the cathode is turned by using a thyristor switching system at the low voltage transformer unit. For anode voltage control, a mod-anode voltage divider system is used which utilize the parallel-circuit of the FET switch and Zener diodes. The RF output power of the klystron was 300 kW for 800 s and 450 kW for 20 s. The maximal temperature at collector top surface was 83 deg. C and power loss at the tube body did not exceed 10 kW, the interlock level for the protection of the klystron. Detailed results of the klystron system test and commissioning are presented.

  4. Radioactive Waste Treatment and Conditioning Using Plasma Technology Pilot Plant: Testing and Commissioning

    International Nuclear Information System (INIS)

    Rafizi Salihuddin; Rohyiza Baan; Norasalwa Zakaria

    2016-01-01

    Plasma pilot plant was commissioned for research and development program on radioactive waste treatment. The plant is equipped with a 50 kW direct current of non-transferred arc plasma torch which mounted vertically on top of the combustion chamber. The plant also consists of a dual function chamber, a water cooling system, a compress air supply system and a control system. This paper devoted the outcome after testing and commissioning of the plant. The problems arise was discussed in order to find the possible suggestion to overcome the issues. (author)

  5. Development of 10kW SOFC module

    Energy Technology Data Exchange (ETDEWEB)

    Hisatome, N.; Nagata, K. [Mitsubishi Heavy Industries, Ltd., Nagasaki (Japan); Kakigami, S. [Electric Power Development Co., Inc., Tokyo (Japan)] [and others

    1996-12-31

    Mitsubishi Heavy industries, Ltd. (MHI) has been developing tubular type Solid Oxide Fuel Cells (SOFC) since 1984. A 1 kW module of SOFC has been continuously operated for 3,000 hours with 2 scheduled thermal cycles at Electric Power Development Co., Inc. (EPDC) Wakamatsu Power Station in 1993. We have obtained of 34% (HHV as H{sub 2}) module efficiency and deterioration rate of 2% Per 1,000 hours in this field test. As for next step, we have developed 10 kW module in 1995. The 10 kW module has been operated for 5,000 hours continuously. This module does not need heating support to maintain the operation temperature, and the module efficiency was 34% (HHV as H{sub 2}). On the other hand, we have started developing the technology of pressurized SOFC. In 1996, pressurized MW module has been tested at MHI Nagasaki Shipyard & Machinery, Works. We are now planning the development of pressurized 10 kW module.

  6. Cost base for hydropower plants : with a generating capacity of more than 10 000 kw : price level 1 January 2010

    Energy Technology Data Exchange (ETDEWEB)

    Slapgaard, Jan

    2012-07-25

    This manual has been prepared as a tool for calculation of average foreseeable contractor costs (civil works) and supplier costs (mechanical and electrical equipment) for large hydroelectric power plants with an early phase generating capacity of more than 10 000 kw. These costs will depend on a number of conditions which may vary from plant to plant, and this requires that the user to have a sound technical knowledge. This applies in particular to the civil works associated with the hydropower plant. The manual is a supplement to our cost base for smaller hydropower projects (Manual No. 2/2010)(au)

  7. Performance and Facility Background Pressure Characterization Tests of NASAs 12.5-kW Hall Effect Rocket with Magnetic Shielding Thruster

    Science.gov (United States)

    Kamhawi, Hani; Huang, Wensheng; Haag, Thomas; Shastry, Rohit; Thomas, Robert; Yim, John; Herman, Daniel; Williams, George; Myers, James; Hofer, Richard; hide

    2015-01-01

    NASA's Space Technology Mission Directorate (STMD) Solar Electric Propulsion Technology Demonstration Mission (SEP/TDM) project is funding the development of a 12.5-kW Hall thruster system to support future NASA missions. The thruster designated Hall Effect Rocket with Magnetic Shielding (HERMeS) is a 12.5-kW Hall thruster with magnetic shielding incorporating a centrally mounted cathode. HERMeS was designed and modeled by a NASA GRC and JPL team and was fabricated and tested in vacuum facility 5 (VF5) at NASA GRC. Tests at NASA GRC were performed with the Technology Development Unit 1 (TDU1) thruster. TDU1's magnetic shielding topology was confirmed by measurement of anode potential and low electron temperature along the discharge chamber walls. Thermal characterization tests indicated that during full power thruster operation at peak magnetic field strength, the various thruster component temperatures were below prescribed maximum allowable limits. Performance characterization tests demonstrated the thruster's wide throttling range and found that the thruster can achieve a peak thruster efficiency of 63% at 12.5 kW 500 V and can attain a specific impulse of 3,000 s at 12.5 kW and a discharge voltage of 800 V. Facility background pressure variation tests revealed that the performance, operational characteristics, and magnetic shielding effectiveness of the TDU1 design were mostly insensitive to increases in background pressure.

  8. Design, performance and economics of the DAF Indal 50 kW and 375 kW vertical axis wind turbine

    Science.gov (United States)

    Schienbein, L. A.; Malcolm, D. J.

    1982-03-01

    A review of the development and performance of the DAF Indal 50 kW vertical axis Darrieus wind turbines shows that a high level of technical development and reliability has been achieved. Features of the drive train, braking and control systems are discussed and performance details are presented. A description is given of a wind-diesel hybrid presently being tested. Details are also presented of a 375 kW VAWT planned for production in late 1982. A discussion of the economics of both the 50 kW and 375 kW VAWTs is included, showing the effects of charge rate, installed cost, operating cost, performance and efficiency. The energy outputs are translated into diesel fuel cost savings for remote communities.

  9. Information system design of inventory control spare parts maintenance (valuation class 5000) (case study: plant kw)

    Science.gov (United States)

    Fitriana, Rina; Moengin, Parwadi; Riana, Mega

    2016-02-01

    Plat KW hadn't using optimal inventory level planning yet and hadn't have an information system that well computerized. The research objective is to be able to design an information system related inventory control of spare parts maintenance. The study focused on five types of spare parts with the highest application rate during February 2013- March 2015 and included in the classification of fast on FSN analysis Grinding stones Cut 4". Cable Tie 15". Welding RB 26-32MM. Ring Plat ½" and Ring Plate 5/8 ". Inventory calculation used Economic Order Quantity (EOQ). Safety Stock (SS) and Reorder Point (ROP) methods. System analysis conducted using the framework PIECES with the proposed inventory control system. the performance of the plant KW relating to the supply of spare parts maintenance needs can be more efficient as well as problems at the company can be answered and can perform inventory cost savings amounting Rp.267.066. A computerized information system of inventory control spare parts maintenance provides a menu that can be accessed by each departments as the user needed.

  10. Operation test for 200-kW class internally improved MCFC stacks having achieved 5000 hours; 200kW kyu naibu kaishitsu gata MCFC sutakku unten shiken 5,000 jikan tassei

    Energy Technology Data Exchange (ETDEWEB)

    Hashino, K. [Kansai Electric Power Co. Inc., Osaka (Japan)

    2000-03-10

    The operation test for 200-kW class internally improved MCFC stacks being performed at the Amagasaki fuel cell power generation testing plant of Kansai Electric Power Co., Inc. has achieved on January 22, 2000 five thousand hours, the original test time target. Temperature raising has begun on June 18 last year, and the first power generation was carried out on June 30. Since then the operation has continued smoothly at near rated output, and the test was completed nearly as planned without experiencing any trouble caused by Y2K problem. This research is being carried out as the research work shared by the Molten Carbonate Fuel Cell Power Generation System Technology Research Association (MCFC Research Association) based on the research commissioning from NEDO as part of the New Sunshine Project. After the confirmation of the initial performance, verification of the carbon dioxide self-sustaining operation, and the property evaluation test of every 500 hours are going smoothly. The intention hereafter is to achieve 5,000 hours as the power generation time, with the schedule to reduce the stack temperature in the middle of February, and cease the operation. As of January 25, the amount of power generated reached 1,089 MWh. (NEDO)

  11. Cost base for small-scale hydropower plants : with a generating capacity of up to 10 000 kw : price level 1 January 2010

    Energy Technology Data Exchange (ETDEWEB)

    Slapgaard, Jan

    2012-07-25

    This manual has been prepared as a tool for calculation of average foreseeable contractor costs (civil works) and supplier costs (mechanical and electrical equipment) for large hydroelectric power plants with an early phase generating capacity of up to 10 000 kw. These costs will depend on a number of conditions which may vary from plant to plant, and this requires that the user to have a sound technical knowledge. This applies in particular to the civil works associated with the hydropower plant. The manual is a supplement to our cost base for larger hydropower projects (Manual No. 1/2012) (au)

  12. Enertech 2-kW high-reliability wind system. Phase II. Fabrication and testing

    Energy Technology Data Exchange (ETDEWEB)

    Cordes, J A; Johnson, B A

    1981-06-01

    A high-reliability wind machine rated for 2 kW in a 9 m/s wind has been developed. Activities are summarized that are centered on the fabrication and testing of prototypes of the wind machine. The test results verified that the wind machine met the power output specification and that the variable-pitch rotor effectively controlled the rotor speed for wind speeds up to 50 mph. Three prototypes of the wind machine were shipped to the Rocky Flats test center in September through November of 1979. Work was also performed to reduce the start-up wind speed. The start-up wind speed to the Enertech facility has been reduced to 4.5 m/s.

  13. Operational tests of the BNL 24.8 kW, 3.80K helium refrigerator

    International Nuclear Information System (INIS)

    Brown, D.P.; Farah, Y.; Gibbs, R.J.; Schlafke, A.P.; Sondericker, J.H.

    1986-01-01

    The BNL 24.8 kW refrigeration system is completely installed and major portions of the acceptance tests have been completed. So far, the equipment tested has performed at or above design levels. The room temperature helium compressor station has been completely tested and accepted. The two-stage oil injected screw compressor system exhibited an isothermal efficiency of 57% while delivering a helium flow in excess of 4400 g/s. Data on the performance of the make-up gas cryogenic purifier is also given. The refrigerator turbomachinery, 13 expanders and three cold compressors, has been tested at room temperature for mechanical integrity and control stability. The first cooldown to operating temperature will be attempted in late August, 1985

  14. Photovoltaic plants in the electronic system

    International Nuclear Information System (INIS)

    Marzio, L.; Vigotti, R.

    1999-01-01

    The article provides a 1998 updated picture of Italy's and the world's photovoltaic market in terms of produced modules and total installed capacity, as well as market growth forecasts up to 2010. After a short description of the state-of-the-art of cell and module manufacturing, ana analysis of the cost of producing a photovoltaic kW is reported for different plant types: stand-alone plants with energy storage batteries, plants connected to low low voltage networks or intended for supporting medium voltage networks, hybrid plants with diesel sets. The article is concluded by illustrating ENEL's (Electric Power Production Company) engagement in the field of photovoltaic solar energy as regards theoretical studies, research and testing of new technologies, and installing plants; over nearly twenty years of activity, ENEL has designed and built a few hundreds of photovoltaic plants for a total capacity of about 4.000 kW, and is currently in the process of setting up a further 370 kW [it

  15. Engineering design of 500KW CW collector

    International Nuclear Information System (INIS)

    Kumar, Ramesh; Mishra, Deepak; Prasad, M.; Hannuarakar, P.R.

    2006-01-01

    An electron beam collector for 500kW beam power has been designed to test the electron gun. The gun is designed for 250kW, 350MHz CW Klystron with 50% efficiency. This will also help in preliminary studies related to final collector design for Klystron. This paper presents the design parameters, thermal analysis and mechanical features of the design. Electron trajectory on inside wall of the collector is determined with EGUN and computational flow dynamics simulation was done on ANSYS for cooling requirements. (author)

  16. Operational tests of the BNL 24.8 kW, 3.8 K helium refrigerator

    International Nuclear Information System (INIS)

    Brown, D.P.; Farah, Y.; Gibbs, R.J.

    1985-01-01

    The BNL 24.8 kW refrigeration system is completely installed and major portions of the acceptance tests have been completed. So far, the equipment tested has performed at or above design levels. The room temperature helium compressor station has been completely tested and accepted. The two-stage oil injected screw compressor system exhibited an isothermal efficiency of 57% while delivering a helium flow in excess of 4400 g/s. Data on the performance of the make-up gas cryogenic purifier is given. The refrigerator turbomachinery, 13 expanders and three cold compressors, has been tested at room temperature for mechanical integrity and control stability. The first cooldown to operating temperature will be attempted in late August, 1985. 2 refs., 5 figs

  17. Wind turbine test Vestas V27-225 kW

    Energy Technology Data Exchange (ETDEWEB)

    Markkilde Petersen, S

    1990-10-15

    The report describes fundamental measurements performed on a Vestas-V27-225 kW pitch regulated wind turbine. The measurements carried out and reported here comprises the power output, system efficiency, energy production, transmission efficiency, rotor power, rotor efficiency, air-brakes efficiency, structural dynamics, loads at cut-in and braking, yaw error statistics, flapwise root bending moment and rotor thrust. (author).

  18. 50 kW laser weapon demonstrator of Rheinmetall Waffe munition

    Science.gov (United States)

    Ludewigt, K.; Riesbeck, Th.; Graf, A.; Jung, M.

    2013-10-01

    We will present the setup of a 50 kW Laser Weapon Demonstrator (LWD) and results achieved with this system. The LWD is a ground based Air Defence system consisting of a Skyguard sensor unit for target acquisition and two laser equipped weapon turrets. The weapon turrets used are standard air defence turrets of Rheinmetall Air Defence which were equipped with several 10 kW Laser Weapon Modules (LWM). Each LWM consists of one 10 kW fiber laser and a beam forming unit (BFU). Commercial of the shelf fiber laser were modified for our defence applications. The BFU providing diffraction limited beam focusing, target imaging and fine tracking of the target was developed. The LWD was tested in a firing campaign at Rheinmetall test ground in Switzerland. All laser beams of both weapon turrets were superimposed on stationary and dynamic targets. Test results of the LWD for the scenarios Air Defence and C-RAMM (counter rockets, artillery, mortar and missiles) will be presented. An outlook for the next development stage towards a 100 kW class laser weapon on RWM will be given.

  19. A 6 kW at 4.5 K helium refrigerator for CERN's Cryogenic Test Station

    International Nuclear Information System (INIS)

    Gistau, G.M.; Bonneton, M.

    1994-01-01

    For purposes of testing the present LEP superconducting resonant cavities and the future LHC magnets, CERN built a test station the cryogenic power of which is presently supplied by a dedicated 6 kW at 4.5 K helium refrigerator. The thermodynamic cycle is discussed and special emphasis is put on a new cryogenic expansion turbine operating in the liquid phase. Information is given about: the cycle screw compressors' performances, the general performance of the refrigerator, the expected efficiency enhancement due to the liquid turbine, an off-design turn down operation

  20. A 205 Hour Krypton Propellant Life Test of the SPT-100 Operating at 3 kW

    Science.gov (United States)

    2013-09-01

    nominal xenon condition (1.35 kW), tests have validated the SPT -100 life time as exceeding 2.71 million N -s (equivalent to approximately 9,000 hours of...condition – If correlation between erosion and energy throughput holds, SPT may be able to endure • Long term life test would be required to validate Kr as...shift (to zero center of SPT at r = 0) • Small rotation to correct for linear stage sag DISTRIBUTION A: Approved for public release; distribution

  1. Nuclear power plants in the world, as of December 31, 1986

    International Nuclear Information System (INIS)

    1987-01-01

    This list of nuclear power plants is published twice every year by the Japan Atomic Industrial Forum, Inc. As of the end of 1986, the nuclear power plants in operation in the world were 376 plants of 276.975 million kW capacity, those under construction were 153 plants of 146.931 million kW capacity, and those in planning stage were 124 plants of 121.89 million kW capacity. The total was 653 plants of 545.796 million kW capacity. During the last one year, 25 plants of 22.955 million kW started the operation, and the construction of 7 plants of 5.872 million kW was begun. The operational experience of nuclear power plants in the world reached about 4050 reactor-year. The nuclear power plants which started the operation in 1986 were 6 plants of 7.311 million kW in USA, 3 plants each of 4.032 million kW in France, 1.992 million kW in UK, and 1.32 million kW in Czechoslovakia, 2 plants each of 1.9 million kW in ROK, 2 million kW in USSR, and 1.43 million kW in Canada, and one plant each in FRG, Spain, Hungary and India. 7 plants in USSR, 3 plants in USA, 2 plants in China and one plant in Philippines were removed from the list due to cancel or postponement. In Japan, 33 plants of 24.686 million kW were in operation, and the average capacity factor was 76.2 %. (Kako, I.)

  2. Development of a 10 kW PEM fuel cell for stationary applications

    Energy Technology Data Exchange (ETDEWEB)

    Barthels, H.; Mergel, J.; Oetjen, H.F. [Institute fuer Energieverfahrenstechnik (IEV), Juelich (Germany)] [and others

    1996-12-31

    A 10 kW Proton Exchange Membrane Fuel Cell (PEMFC) is being developed as part of a long-term energy storage path for electricity in the photovoltaic demonstration plant called PHOEBUS at the Forschungszentrum Julich.

  3. A 20 kw beam-on-target test of a high-power liquid lithium target for RIA

    International Nuclear Information System (INIS)

    Reed, Claude B.; Nolen, Jerry A.; Specht, James R.; Novick, Vincent J.; Plotkin, Perry

    2004-01-01

    The high-power heavy-ion beams produced by the Rare Isotope Accelerator (RIA) driver linac have large energy deposition density in solids and in many cases no solid materials would survive the full beam power. Liquid lithium technology has been proposed to solve this problem in RIA. Specifically, a windowless target for the production of radioactive ions via fragmentation, consisting of a jet of about 3 cm thickness of flowing liquid lithium, exposed to the beamline vacuum [1,2] is being developed. To demonstrate that power densities equivalent to a 200-kW RIA uranium beam, deposited in the first 4 mm of a flowing lithium jet, can be handled by the windowless target design, a high power 1 MeV Dynamitron was leased and a test stand prepared to demonstrate the target's capability of absorbing and carrying away a 20kW heat load without disrupting either the 5 mm x 10 mm flowing lithium jet target or the beam line vacuum

  4. Design, performance, and economics of 50-kW and 500-kW vertical axis wind turbines

    Science.gov (United States)

    Schienbein, L. A.; Malcolm, D. J.

    1983-11-01

    A review of the development and performance of the DAF Indal 50-kW vertical axis Darrieus wind turbine shows that a high level of technical development and reliability has been achieved. Features of the drive train, braking and control systems are discussed and performance details are presented. Details are also presented of a 500-kW VAWT that is currently in production. A discussion of the economics of both the 50-kW and 500-kW VAWTs is included, showing the effects of charge rate, installed cost, operating cost, performance, and efficiency.

  5. Review of 5kW wave energy LOPF buoy design study and test

    DEFF Research Database (Denmark)

    Margheritini, Lucia

    The purpose of this project was to document the mechanical power production against a target power curve of a 5kW grid connected wave energy buoy in Nissum Bredning at Helligsø. This test site is typically used for open sea testing of scale 1:10 devices in irregular waves. In order to better adapt...... to the moderate wave height, the buoy was down sized by a factor of 3 and a new lower target power curve for the buoy was agreed to. Downsizing the project also had the advantage that it is more cost effective and fast to experiment with small wave energy devices than with big devices, at an early development...... stage, in line with the TRL and four phases development (proof of concept, design and feasibility study, field trials and half or fullâ€scale trials) promoted by AAU and supported by the marine renewable energy sector. To complement this, the IEC 114 standards define 3 stages of testing (1=small scale...

  6. Kurokawa 150-kW wind turbine generator demonstration; 150 kW Kurokawa furyoku hatsudensho ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Okamoto, M; Shinohara, M; Sugiyama, T [Kansai Electric Power Co. Inc., Osaka (Japan)

    1996-10-27

    This paper presents the 150kW wind turbine generator erected at a site near Kurokawa dam lake of Kansai Electric Power Co. in Hyogo prefecture. This generator is composed of a horizontal-axis propeller with 3 blades of 27m in diameter and 36/27rpm, and a tower of 30m high. Harmony with the environment was also considered because of the site in a natural park area. Its demonstration test started in Oct. 1996 at annual mean wind velocity of 2m/s. Soft start was realized by controlling inrush current and preventing voltage drop in system interconnection by use of a thyristor circuit. The dual operation system was adopted of a 30kW small generator at lower wind velocity and a 150kW large one at higher velocity. Two kinds of brakes are used, and rotor revolution was reduced by air brake (blade tip spoiler). Mechanical disk brake works for the stopped rotor or emergency stopping. Even if the wind turbine was stopped by exterior factor, if no anomaly of the turbine is found, it automatically re-starts after removal of the factor. The generator is controlled from a remote control station 150km apart through NTT communication line. 6 figs., 2 tabs.

  7. 40 kW Stirling Engine for Solid Fuel

    DEFF Research Database (Denmark)

    Carlsen, Henrik; Trærup, Jens

    1996-01-01

    The external combustion in a Stirling engine makes it very attractive for utilisation of solid fuels in decentralised combined heat and power (CHP) plants. Only a few projects have concentrated on the development of Stirling engines specifically for biomass. In this project, a Stirling engine has...... been designed primarily for utilisation of wood chips. Maximum shaft power is 40 kW corresponding to an electric output of 36 kW. Biomass needs more space in the combustion chamber compared to gas and liquid fuels, and a large heat transfer area is necessary. The design of the new Stirling engine has...... been adapted to the special demands of combustion of wood chips, resulting in a large engine compared to engines for gas or liquid fuels. The engine has four-cylinders arranged in a square. The design is made as a hermetic unit, where the alternator is built into the pressurised crankcase so...

  8. Reconstruction of -35 kV/200 kW HVPS for test of klystron units in LHCD system

    International Nuclear Information System (INIS)

    Huang Yiyun

    2004-01-01

    The paper introduces the -35 kV/200 kW high voltage power supply (HVPS) which is specially used to test klystron units in LHCD system. The new klystrons must be tested under high voltage level before operation and the old klystrons which have worked for a longtime must be exercised by HVPS in lower hybrid current drive (LHCD) system. As the former HVPS has some shortages in engineering design and operation design, the HVPS has to be modified and rebuilt by adopting new method and technology to solve existing bottle-neck problems. (author)

  9. Vibration features of an 180 kW maglev circulator test rig

    International Nuclear Information System (INIS)

    Su Jiageng; Li Hongwei; Shi Qian; Sha Honglei; Yu Suyuan

    2015-01-01

    The helium circulator is the key equipment to drive the helium gas flowing in the primary loop for energy exchange in HTGR. Active magnetic bearings (AMB) have been considered as an alternative to replace traditional mechanical bearings in the helium circulator. Such contactless bearings do not have frictional wear and can be used to suppress vibration in rotor-dynamic applications. It is necessary to study the vibration characteristics of the maglev helium circulator to guarantee the reactor safety. Therefore, a maglev circulator test rig was built. The power of the circulator is 180 kW and the maximum speed is 17000 rpm. For the time being, the test atmosphere is air. In this paper the test rig was introduced. Vibration test work of the maglev circulator was also carried out. The measuring points were arranged at the seat because the seat vibration level is important to evaluate the machine noise. The measuring points were also arranged at the base of the circulator housing to better study the vibration characteristics. The vibrations were measured by the LC-8024 multichannel machinery diagnoses system. At each measuring point the vibrations were detected in three directions (X, Y and Z) with the vibration acceleration sensors. The test speeds varied from 1000 rpm to 17000 rpm with an increase of 1000 rpm each time. The vibration values of the seat are from 89.5 dB at 1000 rpm to 113.3 dB at 17000 rpm. The test results showed that the maglev circulator exhibits good vibration properties. This work will offer important theoretical base and engineering experience to explore the high-speed helium circulator in HTGR. (author)

  10. Field test report of the Department of Energy's 100-kW vertical axis wind turbine

    Science.gov (United States)

    Nellums, R. O.

    1985-02-01

    Three second generation Darrieus type vertical axis wind turbines of approximately 120 kW capacity per unit were installed in 1980-1981. Through March 1984, over 9000 hours of operation had been accumulated, including 6600 hours of operation on the unit installed in Bushland, Texas. The turbines were heavily instrumented and have yielded a large amount of test data. Test results of this program, including aerodynamic, structural, drive train, and economic data are presented. Among the most favorable results were an aerodynamic peak performance coefficient of 0.41; fundamental structural integrity requiring few repairs and no major component replacements as of March 1984; and an average prototype fabrication cost of approximately $970 per peak kilowatt of output. A review of potential design improvements is presented.

  11. Research on industrial 10kW CO2 laser achieves major breakthrough

    Science.gov (United States)

    1991-01-01

    The industrial 10kW CO2 laser is one of the items which the industrially developed nations are competing to develop. This laser is capable of continuous output power of over 10kW and can operate continuously for more than 6 hours. The 10kW CO2 laser developed as a key task of China's 7th Five-Year Plan and all its technological targets such as output power, electrooptical conversion efficiency and primary charging continuous operating time, have reached the level of world advancement, allowing China to enter the ranks of international advancement in the area of laser technology. The industrial 10kW CO2 laser can have wide application in such areas of industry as heat treating, machining, welding and surface treatment in industries such as steel, automobiles, ship building and aircraft manufacturing. For instance, using the high-efficiency laser beams of this 10kW laser to treat rollers, fan blades and automotive cylinder blocks can increase the life of these parts and produce large economic benefits. At present, industrial tests of gear welding is already being done on this 10kW laser.

  12. Engineering and erection of a 300kW high-flux solar simulator

    Science.gov (United States)

    Wieghardt, Kai; Laaber, Dmitrij; Hilger, Patrick; Dohmen, Volkmar; Funken, Karl-Heinz; Hoffschmidt, Bernhard

    2017-06-01

    German Aerospace Center (DLR) is currently constructing a new high-flux solar simulator synlight which shall be commissioned in late 2016. The new facility will provide three separately operated experimental spaces with expected radiant powers of about 300kW / 240kW / 240kW respectively. synlight was presented to the public for the first time at SolarPACES 2015 [1]. Its engineering and erection is running according to plan. The current presentation reports about the engineering and the ongoing erection of the novel facility, and gives an outlook on its new level of possibilities for solar testing and qualification.

  13. Design study of wind turbines, 50 kW to 3000 kW for electric utility applications: Executive summary

    Science.gov (United States)

    1977-01-01

    Preliminary designs of low power (50 to 500 kW) and high power (500 to 3000 kW) wind generator systems (WGS) for electric utility applications were developed. These designs provide the bases for detail design, fabrication, and experimental demonstration testing of these units at selected utility sites. Several feasible WGS configurations were evaluated, and the concept offering the lowest energy cost potential and minimum technical risk for utility applications was selected. The selected concept was optimized utilizing a parametric computer program prepared for this purpose. The utility requirements evaluation task examined the economic, operational and institutional factors affecting the WGS in a utility environment, and provided additional guidance for the preliminary design effort. Results of the conceptual design task indicated that a rotor operating at constant speed, driving an AC generator through a gear transmission is the most cost effective WGS configuration.

  14. New 5 kW free-piston Stirling space convertor developments

    Science.gov (United States)

    Brandhorst, Henry W., Jr.; Chapman, Peter A., Jr.

    2008-07-01

    The NASA Vision for Exploration of the moon may someday require a nuclear reactor coupled with a free-piston Stirling convertor at a power level of 30-40 kW. In the 1990s, Mechanical Technology Inc.'s Stirling Engine Systems Division (some of whose Stirling personnel are now at Foster-Miller, Inc.) developed a 25 kW free-piston Stirling Space Power Demonstrator Engine under the SP-100 program. This system consisted of two 12.5 kW engines connected at their hot ends and mounted in tandem to cancel vibration. Recently, NASA and DoE have been developing dual 55 and 80 W Stirling convertor systems for potential use with radioisotope heat sources. Total test times of all convertors in this effort exceed 120,000 h. Recently, NASA began a new project with Auburn University to develop a 5 kW, single convertor for potential use in a lunar surface reactor power system. Goals of this development program include a specific power in excess of 140 W/kg at the convertor level, lifetime in excess of five years and a control system that will safely manage the convertors in case of an emergency. Auburn University awarded a subcontract to Foster-Miller, Inc. to undertake development of the 5 kW Stirling convertor assembly. The characteristics of the design along with progress in developing the system will be described.

  15. Results from tests of a Stirling engine and wood chips gasifier plant

    DEFF Research Database (Denmark)

    Carlsen, Henrik; Bovin, Jonas Kabell; Werling, J.

    2002-01-01

    The combination of thermal gasification and a Stirling engine is an interesting concept for use in small Combined Heat and Power (CHP) plants based on biomass, because the need for gas cleaning is eliminated and problems with fouling of the Stirling engine heater are considerably reduced....... Furthermore, the overall electric efficiency of the system can be improved. At the Technical University of Denmark a small CHP plant based on a Stirling engine and an updraft gasifier has been developed and tested successfully. The advantages of updraft gasifiers are the simplicity and that the amount...... of the Stirling engine reduces the problems with tar to a minor problem in the design of the burner. The Stirling engine, which has an electric power output of 35 kW, is specifically designed for utilisation of fuels with a content of particles. The gas burner for the engine is designed for low specific energy...

  16. Post-test analysis of 20kW molten carbonate fuel cell stack operated on coal gas. Final report, August 1993--February 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    A 20kW carbonate fuel cell stack was operated with coal gas for the first time in the world. The stack was tested for a total of 4,000 hours, of which 3,900 hours of testing was conducted at the Louisiana Gasification Technology Incorporated, Plaquemine, Louisiana outdoor site. The operation was on either natural gas or coal gas and switched several times without any effects, demonstrating duel fuel capabilities. This test was conducted with 9142 kJ/m{sup 3} (245 Btu/cft) coal gas provided by a slipstream from Destec`s entrained flow, slagging, slurry-fed gasifier equipped with a cold gas cleanup subsystem. The stack generated up to 21 kW with this coal gas. Following completion of this test, the stack was brought to Energy Research Corporation (ERC) and a detailed post-test analysis was conducted to identify any effects of coal gas on cell components. This investigation has shown that the direct fuel cell (DFC) can be operated with properly cleaned and humidified coal-as, providing stable performance. The basic C direct fuel cell component materials are stable and display normal stability in presence of the coal gas. No effects of the coal-borne contaminants are apparent. Further cell testing at ERC 1 17, confirmed these findings.

  17. Coupling of a 2.5 kW steam reformer with a 1 kW el PEM fuel cell

    Science.gov (United States)

    Mathiak, J.; Heinzel, A.; Roes, J.; Kalk, Th.; Kraus, H.; Brandt, H.

    The University of Duisburg-Essen has developed a compact multi-fuel steam reformer suitable for natural gas, propane and butane. This steam reformer was combined with a polymer electrolyte membrane fuel cell (PEM FC) and a system test of the process chain was performed. The fuel processor comprises a prereformer step, a primary reformer, water gas shift reactors, a steam generator, internal heat exchangers in order to achieve an optimised heat integration and an external burner for heat supply as well as a preferential oxidation step (PROX) as CO purification. The fuel processor is designed to deliver a thermal hydrogen power output from 500 W to 2.5 kW. The PEM fuel cell stack provides about 1 kW electrical power. In the following paper experimental results of measurements of the single components PEM fuel cell and fuel processor as well as results of the coupling of both to form a process chain are presented.

  18. Development of 1 kW Stirling cryocooler using a linear compressor

    International Nuclear Information System (INIS)

    Ko, J; Kim, H; Hong, Y J; Yeom, H; In, S; Park, S J

    2015-01-01

    Cryogenic cooling systems for HTS electric power devices require a reliable and efficient high-capacity cryocooler. A Striling cryocooler with a linear compressor can be a good candidate. It has advantages of low vibration and long maintenance cycle compared with a kinematic-driven Stirling cryocooler. In this study, we developed a dual-opposed linear compressor of 12 kW electric input power with two 6 kW linear motors. Electrical performance of the fabricated linear compressor is verified by experimental measurement of thrust constant. The developed Stirling cryocooler has a gamma-type configuration. The piston and displacer are supported with a flexure spring. A slit-type heat exchanger is adopted for the cold and warm-end, and the generated heat is rejected by cooling water. In the cooling performance test, waveforms of voltage, current, displacement and pressure are obtained and their amplitude and phase difference are analysed. The developed cryocooler reaches 47.8 K within 23.4 min. with no-load. Heat load tests shows a cooling capacity of 440 W at 78.1 K with 6.45 kW of electric input power and 19.4 of % Carnot COP. (paper)

  19. Fiscal 1995 survey of promotion of the geothermal development. Report on a usage feasibility test of a small scale geothermal binary cycle power generation system; 1995 nendo chinetsu kaihatsu sokushin chosa. Chusho chinetsu binary hatsuden system jissho shiken hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    In this survey, studies for popularization and practical utilization of small and medium size geothermal binary cycle power systems which assesses low and medium temperature geothermal resources were conducted, and studies for development of the system to be introduced for practical use and for promotion of the popularization were made. A study was carried out of preconditions and various conditions of a demonstrative test plant (100kW class, 500kW class) in view of the initial cost of the actual plant, and an analysis was made of the power generation cost. Acceptability of the demonstrative test plant (100kW class) was examined to analyze problems on the introduction. A thermodynamic analysis was made of the output of geothermal binary cycle power generation. Analysis/evaluation of the results of the 100kW demonstrative test plant were carried out in view of the operation results of the plant of the same kind, and checks/reviews were conducted of performance and reliability of the system, equipment simplification, etc. Inspection of the system was made in the stage of design/manufacture of the 500kW demonstrative test plant. Concerning the spread/expansion of the system, studied were multiple stage geothermal utilization and PR promotion method. 14 refs., 62 figs., 55 tabs.

  20. 26+ Year Old Photovoltaic Power Plant: Degradation and Reliability Evaluation of Crystalline Silicon Modules -- South Array

    Science.gov (United States)

    Olakonu, Kolapo

    As the use of photovoltaic (PV) modules in large power plants continues to increase globally, more studies on degradation, reliability, failure modes, and mechanisms of field aged modules are needed to predict module life expectancy based on accelerated lifetime testing of PV modules. In this work, a 26+ year old PV power plant in Phoenix, Arizona has been evaluated for performance, reliability, and durability. The PV power plant, called Solar One, is owned and operated by John F. Long's homeowners association. It is a 200 kW dc, standard test conditions (STC) rated power plant comprised of 4000 PV modules or frameless laminates, in 100 panel groups (rated at 175 kW ac). The power plant is made of two center-tapped bipolar arrays, the north array and the south array. Due to a limited time frame to execute this large project, this work was performed by two masters students (Jonathan Belmont and Kolapo Olakonu) and the test results are presented in two masters theses. This thesis presents the results obtained on the south array and the other thesis presents the results obtained on the north array. Each of these two arrays is made of four sub arrays, the east sub arrays (positive and negative polarities) and the west sub arrays (positive and negative polarities), making up eight sub arrays. The evaluation and analyses of the power plant included in this thesis consists of: visual inspection, electrical performance measurements, and infrared thermography. A possible presence of potential induced degradation (PID) due to potential difference between ground and strings was also investigated. Some installation practices were also studied and found to contribute to the power loss observed in this investigation. The power output measured in 2011 for all eight sub arrays at STC is approximately 76 kWdc and represents a power loss of 62% (from 200 kW to 76 kW) over 26+ years. The 2011 measured power output for the four south sub arrays at STC is 39 kWdc and represents a power

  1. Testing of a De Nora polymer electrolyte fuel cell stack of 1 kW for naval applications

    Science.gov (United States)

    Schmal, D.; Kluiters, C. E.; Barendregt, I. P.

    In a previous study calculations were carried out for a navy frigate with respect to the energy consumption of a propulsion/electricity generation system based on fuel cells. The fuel consumption for the 'all-fuel cell' ship was compared with the consumption of the current propulsion/electricity generation system based on gas turbines and diesel engines; it showed potential energy savings of a fuel cell based system amounting from 25 to 30%. On the basis of these results and taking into account various military aspects it was decided to start tests with a polymer electrolyte fuel cell (PEFC) stack. For this purpose a De Nora 1 kW PEFC was chosen. Results of the first tests after installation are satisfying.

  2. Design and implementation of a 38 kW dish-Stirling concentrated solar power system

    Science.gov (United States)

    Yan, J.; Peng, Y. D.; Cheng, Z. R.; Liu, F. M.; Tang, X. H.

    2017-11-01

    Dish-Stirling concentrated solar power system (DS-CSP) is an important pathway for converting solar energy into electricity at high efficiency. In this study, a rated power 38 kW DS-CSP system was developed (installed in Xiangtan Electric Manufacturing Group). The heat engine adopted the alpha-type four cylinders double-acting Stirling engine (Stirling Biopower Flexgen S260). The absorber flux distribution simulation was conducted using ray tracing method and then the 204 m2 parabolic dish concentrator system (diameter is 17.70 m and focal length is 9.49 m) with single concentrator plus single pillar supporting has been designed and built. A water-cooled disc target and an absorber imitation device were adopted to test the tracking performance of the dish concentrator system, homogeneity of the focal spot and flux distribution of the absorber. Finally, the S260 Stirling engine was installed on the focal position of the dish concentrator and then the net output power date of the 38 kW DS-CSP system was tested. The absorber overheating problem on the DS-CSP system performance was discussed when the DS-CSP system was installed in different locations. The testing result shows that this system achieved the net output power of 38 kW and solar-to-electricity efficiency (SEE) of 25.3% with the direct normal irradiation (DNI) at 750 W/m2. The net output power can further increase to 40.5 kW with the SEE of 26.6% when the DNI reaches up to the maximum of 761 W/m2. The net output power of the 38 kW DS-CSP system has a linear function relationship with the DNI. The fitting function is Net power output=0.1003×DNIï¼36.129, where DNI is at the range of 460∼761 W/m2. This function could be used to predict the amount of the 38 kW DS-CSP system annual generation power.

  3. MOLCARE development towards MCFC commercial power plants based on 500 kW standard modules

    Energy Technology Data Exchange (ETDEWEB)

    Torazza, A; Dufour, A; Perfumo, A; Ricerche, A; Gegundez, J; Sanson, F; Moreno, A

    1998-07-01

    Fuel cells technologies for stationary applications are expected to play a remarkable role in the field of next decade energy production systems ranging from some hundreds kW to some MW. The interest in using fuel cells to produce electric energy comes from the advantages that fuel cells offer in terms of high efficiency, good behavior at base and partial load, very low emissions, modularity (easy adjustment of plant capacity to power-demand increase), and reduced time to be spent for plant erection. At least four types of fuel cells can be considered suitable for stationary applications. With reference to their electrolyte they can be classified as: Polymeric Electrolyte Membrane Fuel Cells (PEMFC), Phosphoric Acid Fuel Cells (PAFC), Molten Carbonate Fuel Cells (MCFC) and Solid Oxide Fuel Cells (SOFC). Each of them works at a temperature level that is depending on the type of electrolyte. From a general point of view all the fuel cell technologies present, at various extents, the above listed advantages. Nevertheless specific features of each fuel cell type suggest to identify a specific field of application for each type of solution, in order to stress the potential advantages of any technology and minimize its possible drawbacks. Anyway the different level of maturity for the various fuel cell technologies does not allow an homogeneous comparison of technical and economical key parameters. PAFCs, due to their present commercial availability and operation experience, are well outlined in terms of performance and costs; on the contrary with regard to the other technologies--PEMFC, MCFC and SOFC--which are still under development, their commercialization is expected within a period of 7 to 13 years according to single technology maturity level (MCFC level seems to be more ready), kind of application, competitors, environmental constraints, etc.

  4. Performance evaluation of 1 kw PEFC

    Energy Technology Data Exchange (ETDEWEB)

    Komaki, Hideaki [Ishikawajima-Harima Heavy Industries Co., Ltd. Tokyo (Japan); Tsuchiyama, Syozo [Shipbuilding Research Association, Minato-ky, Tokyo (Japan)

    1996-12-31

    This report covers part of a joint study on a PEFC propulsion system for surface ships, summarized in a presentation to this Seminar, entitled {open_quote}Study on a PEFC Propulsion System for Surface Ships{close_quotes}, and which envisages application to a 1,500 DWT cargo vessel. The aspect treated here concerns the effects brought on PEFC operating performance by conditions particular to shipboard operation. The performance characteristics were examined through tests performed on a 1 kw stack and on a single cell (Manufactured by Fuji Electric Co., Ltd.). The tests covered the items (1) to (4) cited in the headings of the sections that follow. Specifications of the stack and single cell are as given.

  5. Plant model of KIPT neutron source facility simulator

    International Nuclear Information System (INIS)

    Cao, Yan; Wei, Thomas Y.; Grelle, Austin L.; Gohar, Yousry

    2016-01-01

    Argonne National Laboratory (ANL) of the United States and Kharkov Institute of Physics and Technology (KIPT) of Ukraine are collaborating on constructing a neutron source facility at KIPT, Kharkov, Ukraine. The facility has 100-kW electron beam driving a subcritical assembly (SCA). The electron beam interacts with a natural uranium target or a tungsten target to generate neutrons, and deposits its power in the target zone. The total fission power generated in SCA is about 300 kW. Two primary cooling loops are designed to remove 100-kW and 300-kW from the target zone and the SCA, respectively. A secondary cooling system is coupled with the primary cooling system to dispose of the generated heat outside the facility buildings to the atmosphere. In addition, the electron accelerator has a low efficiency for generating the electron beam, which uses another secondary cooling loop to remove the generated heat from the accelerator primary cooling loop. One of the main functions the KIPT neutron source facility is to train young nuclear specialists; therefore, ANL has developed the KIPT Neutron Source Facility Simulator for this function. In this simulator, a Plant Control System and a Plant Protection System were developed to perform proper control and to provide automatic protection against unsafe and improper operation of the facility during the steady-state and the transient states using a facility plant model. This report focuses on describing the physics of the plant model and provides several test cases to demonstrate its capabilities. The plant facility model uses the PYTHON script language. It is consistent with the computer language of the plant control system. It is easy to integrate with the simulator without an additional interface, and it is able to simulate the transients of the cooling systems with system control variables changing on real-time.

  6. Plant model of KIPT neutron source facility simulator

    Energy Technology Data Exchange (ETDEWEB)

    Cao, Yan [Argonne National Lab. (ANL), Argonne, IL (United States); Wei, Thomas Y. [Argonne National Lab. (ANL), Argonne, IL (United States); Grelle, Austin L. [Argonne National Lab. (ANL), Argonne, IL (United States); Gohar, Yousry [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-02-01

    Argonne National Laboratory (ANL) of the United States and Kharkov Institute of Physics and Technology (KIPT) of Ukraine are collaborating on constructing a neutron source facility at KIPT, Kharkov, Ukraine. The facility has 100-kW electron beam driving a subcritical assembly (SCA). The electron beam interacts with a natural uranium target or a tungsten target to generate neutrons, and deposits its power in the target zone. The total fission power generated in SCA is about 300 kW. Two primary cooling loops are designed to remove 100-kW and 300-kW from the target zone and the SCA, respectively. A secondary cooling system is coupled with the primary cooling system to dispose of the generated heat outside the facility buildings to the atmosphere. In addition, the electron accelerator has a low efficiency for generating the electron beam, which uses another secondary cooling loop to remove the generated heat from the accelerator primary cooling loop. One of the main functions the KIPT neutron source facility is to train young nuclear specialists; therefore, ANL has developed the KIPT Neutron Source Facility Simulator for this function. In this simulator, a Plant Control System and a Plant Protection System were developed to perform proper control and to provide automatic protection against unsafe and improper operation of the facility during the steady-state and the transient states using a facility plant model. This report focuses on describing the physics of the plant model and provides several test cases to demonstrate its capabilities. The plant facility model uses the PYTHON script language. It is consistent with the computer language of the plant control system. It is easy to integrate with the simulator without an additional interface, and it is able to simulate the transients of the cooling systems with system control variables changing on real-time.

  7. Demonstration of the 500 kW stoker burning system; 500 kW stokeripolttojaerjestelmaen demonstrointi

    Energy Technology Data Exchange (ETDEWEB)

    Oravainen, H. [VTT Energy, Jyvaeskylae (Finland); Kantalainen, K. [Hoegfors Laempoe Oy, Saarijaervi (Finland)

    1995-12-31

    The objective of the project is to demonstrate the operation of a 500 kW stoker-burning system in practice. The project is continuation of the previous projects of the Bioenergy research programme, 303 - Development of automatic heating system for wood chips and sod peat, carried out by VTT Energy, and Y301 - Development of heating boiler for wood chips and sod peat, carried out by Hoegfors Laempoe Oy. A 500 kW (nominal power) stoker-burner was constructed on the basis of the results of these projects. The burner was mounted on ETNA 500 bioenergy boiler. Screw-feeders, constructed by Maamiehen Saehkoe Oy, were used as fuel feeding system. Maamiehen Saehkoe Oy delivered also the automation system for the combustion equipment. Combustion air pre-heater was mounted on the boiler for promotion of the combustion of moist fuel. Testing of the equipment was carried out at the laboratory of VTT Energy in Jyvaeskylae in October-November 1994. In December 1994 the equipment was transported to Jalasjaervi, to heating station of the farmer Juha Jyrae. The actual heat generation started in the beginning of February 1995, when the greenhouses started to require heating. Sod peat has been used as the fuel. VTT Energy has carried out the efficiency and emission measurements in the heating station with sod peat in March 1995, and with reed canary grass in autumn 1995. The energy generation and fuel consumption have been followed all the time

  8. Demonstration of the 500 kW stoker burning system; 500 kW stokeripolttojaerjestelmaen demonstrointi

    Energy Technology Data Exchange (ETDEWEB)

    Oravainen, H [VTT Energy, Jyvaeskylae (Finland); Kantalainen, K [Hoegfors Laempoe Oy, Saarijaervi (Finland)

    1996-12-31

    The objective of the project is to demonstrate the operation of a 500 kW stoker-burning system in practice. The project is continuation of the previous projects of the Bioenergy research programme, 303 - Development of automatic heating system for wood chips and sod peat, carried out by VTT Energy, and Y301 - Development of heating boiler for wood chips and sod peat, carried out by Hoegfors Laempoe Oy. A 500 kW (nominal power) stoker-burner was constructed on the basis of the results of these projects. The burner was mounted on ETNA 500 bioenergy boiler. Screw-feeders, constructed by Maamiehen Saehkoe Oy, were used as fuel feeding system. Maamiehen Saehkoe Oy delivered also the automation system for the combustion equipment. Combustion air pre-heater was mounted on the boiler for promotion of the combustion of moist fuel. Testing of the equipment was carried out at the laboratory of VTT Energy in Jyvaeskylae in October-November 1994. In December 1994 the equipment was transported to Jalasjaervi, to heating station of the farmer Juha Jyrae. The actual heat generation started in the beginning of February 1995, when the greenhouses started to require heating. Sod peat has been used as the fuel. VTT Energy has carried out the efficiency and emission measurements in the heating station with sod peat in March 1995, and with reed canary grass in autumn 1995. The energy generation and fuel consumption have been followed all the time

  9. Port Menier thermal power plant: Pre-project report

    International Nuclear Information System (INIS)

    1992-02-01

    Port Menier, the town on Anticosti Island in the St Lawrence River estuary, is supplied with electricity from a diesel power plant having a firm capacity of 1,080 kW. Since 1987, power demand has increased at an average annual rate of 5.7%, raising the winter peak demand from 670 kW to 987 kW. The power plant is located in the center of town and is obsolete, presenting a number of architectural, environmental, and operational deficiencies. It is proposed to construct a new power plant having an initial firm capacity of 1,490 kW and storage capacity for 75,000 liters of fuel. The plant site will have an area of ca 6,265 m 2 to allow for an eventual expansion to over 3,000 kW capacity, sufficient for satisfying forecast demand over the next 20 years. Estimated cost of the new plant is ca $9.5 million. The old plant will be decommissioned and the new plant will be built at a site outside of town. The natural and human environments characteristic of the Port Menier area are detailed and the two selected sites for the new plant are described and compared. A site in the industrial zone of Port-Menier is favored. The environmental impacts of the new plant are analyzed and mitigation measures during the preconstruction, construction, and operational phases are proposed. Local economic impacts are estimated at around $990,000. 20 refs., 12 figs., 12 tabs

  10. 110GHz-500kW long-pulse gyrotron with built-in quasi-optical mode converter

    International Nuclear Information System (INIS)

    Sakamoto, Keishi; Kariya, Tsuyoshi; Hayashi, Ken-ichi.

    1994-01-01

    We have designed, fabricated, and tested a 110 GHz-500 kW long-pulse gyrotron. The gyrotron incorporates a quasi-optical mode converter which transforms the oscillation mode, TE 22,2 , into a Gaussian radiation beam. The adoption of a built-in mode converter enabled us to design the electron beam collector so as to be capable of tolerating a 2 MW heat load. Attention was also paid to designing the gyrotron cavity and output window so as to permit long-pulse operations. In an experiment, we observed a maximum output power of 550 kW and achieved 1.3 s operation at a power level of 410 kW. (author)

  11. Structural analysis of a 1kW Darrieus turbine spoke

    DEFF Research Database (Denmark)

    Belloni, Federico; Bedon, Gabriele; Castelli, Marco Raciti

    A structural study of a 1 kW Darrieus turbine spoke was performed in order to study stress distribution on the piece and make it more light. The VAWT turbine, originally intended for urban operation, is provided with 3 blades and 6 spokes. Since turbine initial tests showed relevant balancing...

  12. Performance of the 1 kW thermoelectric generator for diesel engines

    International Nuclear Information System (INIS)

    Bass, J.C.; Elsner, N.B.; Leavitt, F.A.

    1994-01-01

    Hi-Z Technology, Inc. (Hi-Z) has been developing a 1 kW thermoelectric generator for class eight Diesel truck engines under U.S. Department of Energy and California Energy Commission funding since 1992. The purpose of this generator is to replace the currently used shaft-driven alternator by converting part of the waste heat in the engine's exhaust directly to electricity. The preliminary design of this generator was reported at the 1992 meeting of the XI-ICT in Arlington, Texas. This paper will report on the final mechanical, thermal and thermoelectric design of this generator. The generator uses seventy-two of Hi-Z's 13 Watt bismuth-telluride thermoelectric modules for energy conversion. The number of modules and their arrangement has remained constant through the program. The 1 kW generator was tested on several engines during the development process. Many of the design features were changed during this development as more information was obtained. We have only recently reached our design goal of 1 kW output. The output parameters of the generator are reported. copyright 1995 American Institute of Physics

  13. Power-hardware-in-the-loop test of VSC-HVDC connection for off-shore wind power plants

    Energy Technology Data Exchange (ETDEWEB)

    Sharma, Ranjan [Siemens Wind Power A/S, Brande (Denmark); Technical Univ. of Denmark (Denmark). Center for Electric Technology; Cha, Seung T.; Wu, Qiuwei; Rasmussen, Tonny W.; Oestergaard, Jacob [Technical Univ. of Denmark (Denmark). Center for Electric Technology; Jensen, Kim H. [Siemens Wind Power A/S, Brande (Denmark)

    2011-07-01

    This paper present a power-hardware-in-the-loop (PHIL) test of an off-shore wind power plant (WPP) interconnected to the on-shore grid via a VSC-HVDC connection. The intention of the PHIL test is to verify the hardware interaction and the control co-ordination between the plant side VSC of the HVDC system and the wind turbines within the WPP in order to ensure smooth operation of the WPP under both normal and fault operating condition. The PHIL test platform is comprised of a real time digital simulator (RTDS), a Spitzenberger Spies three phase 7,5 kW power amplifier, a purpose built VSC and a DC chopper. The WPP is simulated in the RTDS as a single full-scale wind turbine. The simulated WPP interacts with the WPP side VSC through the power amplifier. The interface between the RTDS and the power amplifier is done via an analogue GTAO I/O card of the RTDS and the input channel of the amplifier. The amplifier scales up the voltages at the point of connection of the WPP in the RTDS to the voltage level for the WPP side VSC. The WPP side VSC converter is equipped with a DC chopper. The test results show the successful control coordination between the WPP and the plant side VSC converter of the HVDC connection of the WPP. (orig.)

  14. First Results of the IOT Based 300 kW 500 MHz Amplifier for the Diamond Light Source

    CERN Document Server

    Jensen, Morten; Maddock, Matt; Müller, Marc; Rains, Simon; Watkins, Alun V

    2005-01-01

    We present the first RF measurements of the IOT based 300 kW 500 MHz amplifier for the Diamond Light Source. Four 80 kW IOTs are combined using a waveguide combiner to achieve the RF requirement of up to 300 kW for each of three superconducting cavities for the main storage ring. The IOTs are protected by a full power circulator and a 300 kW ferrite RF load. This is the first time IOTs will be used for a synchrotron light source. This paper gives an overview of the design of the Thales amplifiers and IOTs with commissioning results including measurements of key components and overall RF performance following factory tests and the installation of the first unit

  15. 6kW class laser cutting equipment; 6kW daishutsuryoku laser setsudanki ni yoru atsuita setsudan

    Energy Technology Data Exchange (ETDEWEB)

    Nagata, Y.; Nagahori, M. [Tanaka Engineering Works Ltd., Saitama (Japan)

    1994-11-01

    Application of the laser cutting machine to the area of cutting steel plates of 5 mm thick or more was first enabled in 1990 by the 2 kW oscillator that was introduced in that year. The thick plate cutting industry has a short history. This paper describes the features and performance of the 6 kW laser cutting machine that was announced in April, 1994. The machine uses a newly developed high-speed axial flow type carbon dioxide laser oscillater with the rated output of 6 kW. As the discharge excitation method, the machine adopted the RF (radio frequency) method that causes low contamination in the discharge tube. The 6 kW laser cutting machine has a number of features such as a large cutting area provided by the oscillator contained in the cutting machine, cutting quality stabilized by the optical path length fixing unit, and automatic functions such as automatic setting of the cutting conditions and scheduled operation. The machine can cut mild steel plates of up to 40 mm thick (or up to 16 mm for stainless steel plates) at the cutting speed of 1600 mm/min for a 16 mm thick plate and 2200 mm/min for a 12 mm thick plate, with the good cut sectional surface. 5 figs., 1 tab.

  16. Compact Design of 10 kW Proton Exchange Membrane Fuel Cell Stack Systems with Microcontroller Units

    Directory of Open Access Journals (Sweden)

    Hsiaokang Ma

    2014-04-01

    Full Text Available In this study, fuel, oxidant supply and cooling systems with microcontroller units (MCU are developed in a compact design to fit two 5 kW proton exchange membrane fuel cell (PEMFC stacks. At the initial stage, the testing facility of the system has a large volume (2.0 m × 2.0 m × 1.5 m with a longer pipeline and excessive control sensors for safe testing. After recognizing the performance and stability of stack, the system is redesigned to fit in a limited space (0.4 m × 0.5 m × 0.8 m. Furthermore, the stack performance is studied under different hydrogen recycling modes. Then, two similar 5 kW stacks are directly coupled with diodes to obtain a higher power output and safe operation. The result shows that the efficiency of the 5 kW stack is 43.46% with a purge period of 2 min with hydrogen recycling and that the hydrogen utilization rate µf is 66.31%. In addition, the maximum power output of the twin-coupled module (a power module with two stacks in electrical cascade/parallel arrangement is 9.52 kW.

  17. Low concentration ratio solar array for low Earth orbit multi-100 kW application. Volume 1: Design, analysis and development tests

    Science.gov (United States)

    1983-01-01

    A preliminary design effort directed toward a low concentration ratio photovoltaic array system capable of delivering multihundred kilowatts (300 kW to 1000 kW range) in low earth orbit is described. The array system consists of two or more array modules each capable of delivering between 113 kW to 175 kW using silicon solar cells or gallium arsenide solar cells, respectively. The array module deployed area is 1320 square meters and consists of 4356 pyramidal concentrator elements. The module, when stowed in the Space Shuttle's payload bay, has a stowage volume of a cube with 3.24 meters on a side. The concentrator elements are sized for a geometric concentration ratio (GCR) of six with an aperture area of .25 sq. m. The structural analysis and design trades leading to the baseline design are discussed. It describes the configuration, as well as optical, thermal and electrical performance analyses that support the design and overall performance estimates for the array are described.

  18. Performance improvement of 100 kW high frequency transmitter for CW operation

    International Nuclear Information System (INIS)

    Kwak, J. G.; Yoon, J. S.; Bae, Y. D.; Cho, C. G.; Wang, S. J.; Lee, K. D.

    2001-08-01

    For the plasma heating of KSTAR(Korea Superconducting Tokamak Advanced Research)by using ICH(Ion Cyclotron Heating), it is designed that the selective ion heating and current drive are performed by the transmitter with the rf power of 8 MW in the frequency range of 25-60 MHz. 100 kW HF transmitter was constructed for the high voltage/current test of ICH antenna and HF transmission components. The output power is about 100 kW around 30 MHz. Thomson 581 tetrode is used for the final amplifier whose cavity type is ground cathode. Overall gain is above 15 dB and the bandwidth is about 100 kHz

  19. Design study of wind turbines 50 kW to 3000 kW for electric utility applications. Volume 2: Analysis and design

    Science.gov (United States)

    1976-01-01

    All possible overall system configurations, operating modes, and subsystem concepts for a wind turbine configuration for cost effective generation of electrical power were evaluated for both technical feasibility and compatibility with utility networks, as well as for economic attractiveness. A design optimization computer code was developed to determine the cost sensitivity of the various design features, and thus establish the configuration and design conditions that would minimize the generated energy costs. The preliminary designs of both a 500 kW unit and a 1500 kW unit operating in a 12 mph and 18 mph median wind speed respectively, were developed. The various design features and components evaluated are described, and the rationale employed to select the final design configuration is given. All pertinent technical performance data and component cost data is included. The costs of all major subassemblies are estimated and the resultant energy costs for both the 500 kW and 1500 kW units are calculated.

  20. Thermic solar plants for the production of electricity in Mexico: present and future

    International Nuclear Information System (INIS)

    Almanza, R.

    1990-01-01

    During the last decade, there are have been some important achievements in generating electricity using solar concentrators. The Instituto de Ingenieria, of the Universidad Nacional Autonoma de Mexico (UNAM), has started the design and construction of solar thermic plants for generating electricity , capable of reaching 1 Kw and 10 Kw. The Instituto continues developing the research and testing of new materials, because this way of generating electricity has become economically feasible: besides, it constitutes a non polluting alternative. (Author)

  1. Efficient IEC permanent-magnet motor (3 kW) - Final report; Effizienter IEC Permanent-Magnet-Motor (3 kW) - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Lindegger, M. [Circle Motor AG, Guemligen (Switzerland); Biner, H. P.; Evequoz, B. [Haute Ecole valaisanne, Sion (Switzerland); Salathe, D. [Hochschule Luzern, Technik und Architektur, Horw (Switzerland)

    2008-04-15

    Efficient permanent-magnet motors achieve in the area up to 100 kW a higher efficiency than induction machines (standard motors). A simple and fast energy saving option is the exchange of inefficient standard motors. The objective of this work is to install a 3 kW permanent-magnet motor in a standard IEC housing and the optimization of the design for high efficiency. Another objective is the development and the realization of an efficient variable speed control. The efficiency of the motor and the inverter with the control system must be demonstrated by tests. These tasks have been split between Circle Motor AG and the universities of applied sciences of Valais and Lucerne. Considering high-efficiency and low manufacturing cost, a brushless DC solution was adopted. This resulted in an optimum design of the motor and the control system realized with a three-phase rectifier, a buck converter with variable DC voltage, and a three-phase inverter feeding full positive and negative current to two of the legs simultaneously. The maximum measured efficiency is about 96.5% for the inverter and 92% for the motor. With the advantage of the variable speed operation, the efficiency of the realized 3 kW permanent magnet motor together with the control system is always higher than the efficiency of a measured class EFF1 induction motor, even with a direct connection to the grid. The permanent-magnet motor is also about 10 kg lighter. The cost calculation shows that the permanent-magnet motor can be competitive with the induction motor when speed control is desired. This is also the domain with the largest potential for energy savings from variable speed pumps, compressors, fans. (author)

  2. The pilot plant for electron beam food processing

    Science.gov (United States)

    Migdal, W.; Walis, L.; Chmielewski, A. G.

    1993-07-01

    In the frames of the national programme on the application of irradiation for food preservation and hygienization an experimental plant for electron beam processing has been established in INCT. The pilot plant has been constructed inside an old fort what decreases significantly the cost of the investment. The pilot plant is equipped with a small research accelerator Pilot (10 MeV, 1 kW) and an industrial unit Elektronika (10 MeV, 10 kW). This allows both laboratory and full technological scale testing of the elaborated process to be conducted. The industrial unit is being equipped with e-/X conversion target, for high density products irradiation. On the basis of the research there were performed at different scientific institutions in Poland, health authorities have issued permissions for permanent treatment of spices, garlic, onions and temporary permissions for mushrooms, and potatoes. Dosimetric methods have been elaborated for the routine use at the plant. In the INCT laboratory methods for the control of e-/X treated food have been established.

  3. The pilot plant for electron beam food processing

    International Nuclear Information System (INIS)

    Migdal, W.; Kosmal, W.; Malec-Czechowska, K.; Maciszewski, W.

    1992-01-01

    In the frames of the national programme on the application of irradiation for food preservation and hygienization an experimental plant for electron beam processing has been established in INCT. The pilot plant has been constructed inside an old fort what decreases significantly the cost of the investment. The pilot plants is equipped with a small research accelerator Pilot (10 MeV, 1 kW) and an industrial unit Elektronika (10 MeV, 10 kW). This allows both laboratory and full technological scale testing of the elaborated process to be conducted. The industrial unit is being equipped with e-/X conversion target, for high density products irradiation. On the basis of the research there were performed at different scientific institutions in Poland, health authorities have issued permissions for permanent treatment of spices, garlic, onions and temporary permissions for mushrooms, and potatoes. Dosimetric methods have been elaborated for the routine use at the plant. In the INCT laboratory methods for the control of e-/X treated food have been established. (author). 9 refs, 5 figs, 1 tab

  4. Development program for a 200 kW, CW, 28 GHz gyroklystron. Final report, April 1976-September 1980

    International Nuclear Information System (INIS)

    Shively, J.; Conner, C.; Evans, S.

    1980-01-01

    The objective of this program was to develop a microwave amplifier or oscillator capable of producing 200 kW, CW power output at 28 GHz. The use of the gyrotron or cyclotron resonance interaction was pursued. A room temperature hollow core solenoid magnet with an iron case was designed to produce the magnetic field required for electron cyclotron resonance. Three pulsed gyroklystron amplifiers were built providing increasing stable output powers of 6, 65 and 76 kW. A back-up pulsed gyrotron oscillator produced 248 kW. A ceramic cone broadband water load was developed. Tests are described for the various tubes that were developed

  5. Direct FuelCell/Turbine Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Hossein Ghezel-Ayagh

    2008-09-30

    This report summarizes the progress made in development of Direct FuelCell/Turbine (DFC/T{reg_sign}) power plants for generation of clean power at very high efficiencies. The DFC/T system employs an indirectly heated Turbine Generator to supplement fuel cell generated power. The concept extends the high efficiency of the fuel cell by utilizing the fuel cell's byproduct heat in a Brayton cycle. Features of the DFC/T system include: electrical efficiencies of up to 75% on natural gas, minimal emissions, reduced carbon dioxide release to the environment, simplicity in design, direct reforming internal to the fuel cell, and potential cost competitiveness with existing combined cycle power plants. Proof-of-concept tests using a sub-MW-class DFC/T power plant at FuelCell Energy's (FCE) Danbury facility were conducted to validate the feasibility of the concept and to measure its potential for electric power production. A 400 kW-class power plant test facility was designed and retrofitted to conduct the tests. The initial series of tests involved integration of a full-size (250 kW) Direct FuelCell stack with a 30 kW Capstone microturbine. The operational aspects of the hybrid system in relation to the integration of the microturbine with the fuel cell, process flow and thermal balances, and control strategies for power cycling of the system, were investigated. A subsequent series of tests included operation of the sub-MW Direct FuelCell/Turbine power plant with a Capstone C60 microturbine. The C60 microturbine extended the range of operation of the hybrid power plant to higher current densities (higher power) than achieved in initial tests using the 30kW microturbine. The proof-of-concept test results confirmed the stability and controllability of operating a fullsize (250 kW) fuel cell stack in combination with a microturbine. Thermal management of the system was confirmed and power plant operation, using the microturbine as the only source of fresh air supply

  6. Infrared face recognition based on LBP histogram and KW feature selection

    Science.gov (United States)

    Xie, Zhihua

    2014-07-01

    The conventional LBP-based feature as represented by the local binary pattern (LBP) histogram still has room for performance improvements. This paper focuses on the dimension reduction of LBP micro-patterns and proposes an improved infrared face recognition method based on LBP histogram representation. To extract the local robust features in infrared face images, LBP is chosen to get the composition of micro-patterns of sub-blocks. Based on statistical test theory, Kruskal-Wallis (KW) feature selection method is proposed to get the LBP patterns which are suitable for infrared face recognition. The experimental results show combination of LBP and KW features selection improves the performance of infrared face recognition, the proposed method outperforms the traditional methods based on LBP histogram, discrete cosine transform(DCT) or principal component analysis(PCA).

  7. Nuclear power plants in the world as of June 30, 1986. Genshiryoku hatsudensho ichiranhyo 1986 nen 6 gatsu 30 nichi genzai

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    This list of nuclear power plants in the world is the summary of the results of having investigated the nuclear power plants in operation, under construction and in planning stage in the world twice every year. As of the end of June, 1986, the nuclear power plants in operation in the world were 365 plants of 267.28 million kW, those under construction were 163 plants of 155.564 million kW, and those in planning stage were 130 plants of 130.401 million kW, in total, 658 plants of 553.245 million kW total capacity. In this half a year period, 14 plants of 13.439 million kW started the operation anew, the construction of two plants of 1.8 million kW was begun, and two plants of 2.25 million kW entered the planning stage. The 14 plants started the operation were four plants in USA, two plants each in France, USSR and Canada, and one plant each in Spain, ROK, Czechoslovakia and India. The construction of two plants was begun in China, and two plants entered the planning stage were one each in USSR and Belgium. The Chernobyl-4 accident occurred in April, 1986 was the worst in the history of nuclear power development. Having been affected by this accident, the execution of nuclear power project is slowed down in Belgium, Finland, Netherlands, Yugoslavia, Taiwan and Egypt. (Kako, I.).

  8. Minimization of emissions. (CO and NO) on a 300 kW wood fuel boiler

    International Nuclear Information System (INIS)

    Johansson, Erik

    1997-01-01

    The purpose with this investigation was to study a 300 kW power plant in Ed, Dalsland that is using biomass as fuel and to reduce CO and NO-pollutants as much as possible. The experiments were performed according to statistical experimental design and the result was compared with similar studies. The most important results of the present work were: Today, the boiler is using biomass with too much moisture and that's the reason why the smoke contains a great quantity of CO. This could be reduced with a lower quantity of moisture in the biomass or rebuilding of the boiler. Doors and dampers should be fully closed so air can't pass through because that would reduce the energy losses in the smoke. The automatic control should be changed to reduce the time that biomass are not transported in to the boiler. Biomass with low content of moisture (about 15 %) are a good fuel in the boiler. The smoke needs to be measured continuously to reduce the pollutants because it is not possible to detect visually. If a low amount of oxygen in the smoke (7 %) and high amount of primary air (52 % of total air) and the plant is using low power (120 kW), pollutants is reduced. When using middle power (190 kW), a low amount of oxygen in the smoke is also needed (7%) but a smaller amount of air to the bed (40%) will reduce pollutants. The reason for this is probably that too much air in the bed will make it too cool. The result showed that by using statistical experimental design the amount of CO was reduced with 45 % to 263 ppm and the amount of NO reduced with 80 % to 30 ppm (51 mg/MJ NO 2 ) while using biomass with 34 % moisture Examination paper. 28 refs, 13 figs, 9 tabs, appendixes

  9. A 25-kW Series-Resonant Power Converter

    Science.gov (United States)

    Frye, R. J.; Robson, R. R.

    1986-01-01

    Prototype exhibited efficiency of 93.9 percent. 25-kW resonant dc/dc power converter designed, developed, fabricated, and tested, using Westinghouse D7ST transistors as high-power switches. D7ST transistor characterized for use as switch in series-resonant converters, and refined base-drive circuit developed. Technical base includes advanced switching magnetic, and filter components, mathematical circuit models, control philosophies, and switch-drive strategies. Power-system benefits such as lower losses when used for high-voltage distribution, and reduced magnetics and filter mass realized.

  10. Strength and fatigue testing of large size wind turbines rotors. Vol. II: Full size natural vibration and static strength test, a reference case

    Energy Technology Data Exchange (ETDEWEB)

    Arias, F.; Soria, E.

    1996-12-01

    This report shows the methods and procedures selected to define a strength test for large size wind turbine, anyway in particular it application on a 500 kW blade and it results obtained in the test carried out in july of 1995 in Asinel`s test plant (Madrid). Henceforth, this project is designed in an abbreviate form whit the acronym SFAT. (Author)

  11. Strength and fatigue testing of large size wind turbines rotors. Volume II. Full size natural vibration and static strength test, a reference case

    International Nuclear Information System (INIS)

    Arias, F.; Soria, E.

    1996-01-01

    This report shows the methods and procedures selected to define a strength test for large size wind turbine, anyway in particularly it application on a 500 kW blade and it results obtained in the test carried out in july of 1995 in Asinel test plant (Madrid). Henceforth, this project is designed in an abbreviate form whit the acronym SFAT. (Author)

  12. FY 1977 Annual report on Sunshine Project results. Experimental research for detailed designs of tower light-collection type solar thermal power plant; 1977 nendo taiyonetsu hatsuden plant (tower shuko hoshiki) no shosai sekkei no tame no shiken kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1978-03-31

    This project is aimed at pursuing technical and economic possibilities of solar thermal power plant by development of devices for a tower light-collecting type solar thermal power plant (in particular, heliostat, heat absorber and heat storage device) and materials therefor through the basic tests, and tests using a 10 kW heat collector and construction, on a trial basis, of a large-scale model plant with a commercial heliostat, and by planning to construct a 1,000 kW-class pilot plant for generating peak-shaving power using these devices. The major achievements in the FY1977 are summarized. The system analysis estimates annual power production possibly reaching 547,600 kWH. The heat-collecting test plant records a heat-collecting efficiency of 50 to 70% for collected heat quantity of 50 kW or more. The heliostat test confirms that the GL type is more favorable than the XY type. The heat absorber, which is a 1/3 model of the commercial device, is tested for its heat releasing performance, producing the quantitative released heat data. The heat transfer characteristics are investigated for the regenerative heat exchanger when the phase changes occur simultaneously on both molten salt and water sides. The mirror is exposure-tested in the field test for 1 year, to collect the data. (NEDO)

  13. The 25 kW resonant dc/dc power converter

    Science.gov (United States)

    Robson, R. R.

    1983-01-01

    The feasibility of processing 25-kW of power with a single, transistorized, series resonant converter stage was demonstrated by the successful design, development, fabrication, and testing of such a device which employs four Westinghouse D7ST transistors in a full-bridge configuration and operates from a 250-to-350 Vdc input bus. The unit has an overall worst-case efficiency of 93.5% at its full rated output of 1000 V and 25 A dc. A solid-state dc input circuit breaker and output-transient-current limiters are included in and integrated into the design. Full circuit details of the converter are presented along with the test data.

  14. 2-kW single-mode fiber laser employing bidirectional-pump scheme

    Science.gov (United States)

    Zhang, Fan; Zheng, Wenyou; Shi, Pengyang; Zhang, Xinhai

    2018-01-01

    2kW single-mode fiber laser with two cascade home-made cladding light strippers (CLSs) by employing bidirectionalpump scheme has been demonstrated. 2.009 kW signal power is obtained when pump power is 2.63 kW and the slope efficiency is 76.6%. Raman Stokes light is less than -47 dB at 2.009 kW even with a 10-m delivery fiber with core/inner cladding diameter of 20/400um. The beam quality M2<=1.2 and the spectral FWHM bandwidth is 4.34nm. There is no transverse mode instability and the output power stability of +/-0.14% is achieved by special thermal management for a more uniform temperature distribution on the Yb-doped gain fiber.

  15. Characteristics and uses of a 250 kW TRIGA reactor

    International Nuclear Information System (INIS)

    Dimic, V.

    1985-01-01

    The 250 kW TRIGA Mark II reactor is a light water reactor with solid fuel elements in which the zirconium hydride moderator is homogeneously distributed between enriched uranium. Therefore the reactor has the large prompt negative temperature coefficient of reactivity, the fuel also has very high retention of radioactive fission products. The reactor core is a cylindrical configuration with an annular graphite reflector. The experimental facilities include a rotary specimen rack, a central incore radiation thimble, a pneumatic transfer system, and pulsing capability. Other experimental facilities include two radial and two tangential beam tubes, a graphite thermal column, and a graphite thermalizing column. At the steady state power of 250 kW the peak flux is 1x10 13 n/cm 2 s in the central test position. In addition, pulsing to about 2000 MW is usually provided giving peak fluxes of about 2x10 16 n/cm 2 sec. All TRIGA reactors produce a core-average thermal neutron flux of about 10 7 n.v per watt. Only with very large accelerators could such a high neutron flux be achieved. In order to give an appreciation for the research conducted at research reactors, the types of research could be summarized as follows: thermal neutron scattering, neutron radiography, neutron and nuclear physics, activation analysis, radiochemistry, biology and medicine, and teaching and training. Typical applied research with a 250 kW reactor has been conducted in medicine in biology, archeology, metallurgy and materials science, engineering and criminology. It is well known that research reactors have been used routinely to produce isotopes for industry and medicine. In some instances, reactors are the preferred method of isotope production. We can conclude that the 250 kW TRIGA research reactor is a useful and wide ranging source of radiation for basic and applied research. The operation cost for this instrument is relatively low. (author)

  16. Field Testing of LIDAR-Assisted Feedforward Control Algorithms for Improved Speed Control and Fatigue Load Reduction on a 600-kW Wind Turbine: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Kumar, Avishek A.; Bossanyi, Ervin A.; Scholbrock, Andrew K.; Fleming, Paul; Boquet, Mathieu; Krishnamurthy, Raghu

    2015-12-14

    A severe challenge in controlling wind turbines is ensuring controller performance in the presence of a stochastic and unknown wind field, relying on the response of the turbine to generate control actions. Recent technologies such as LIDAR, allow sensing of the wind field before it reaches the rotor. In this work a field-testing campaign to test LIDAR Assisted Control (LAC) has been undertaken on a 600-kW turbine using a fixed, five-beam LIDAR system. The campaign compared the performance of a baseline controller to four LACs with progressively lower levels of feedback using 35 hours of collected data.

  17. Reports on 1979 result of Sunshine Project. Testing research for detailed design of solar thermal power generation plant (tower converging method); 1979 nendo taiyonetsu hatsuden plant (tower shuko hoshiki) no shosai sekkei no tame no shiken kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1980-03-31

    This report briefly describes first, in the summary of the results, the contents of the research results of the year with the outcome as the central point. Then, it explains in detail, in the contents of the research, the substance of each research item, results, their examination contents, and future research subjects. The objective of the research is, for the purpose of technically seeking the cost performance of a solar thermal power generation plant, (1) to develop equipment constituting the plant and (2) to develop a pilot plant having an electrical output of about 1,000kW at the peak by the tower converging method. The research results were as follows. (1) In the confirming test of a heliostat test unit, the final conclusion was obtained of the wind resistance calculated value by the wind tunnel test of the heliostat; the design materials of the assembly jigs were obtained; the data of the operation forecast was obtained in a tracking test; and a sensor was developed for the tracking instrumentation. (2) In the confirming test of the improved absorbing surface/mirror, the improvement/trial production including the manufacturing method was carried out as the absorbing surface for the actual unit. (3) In the heat collecting test, steam generation and a loop control test were performed. (4) The plant system was analyzed, with data obtained for the operating method. (NEDO)

  18. Design of Radial Inflow Turbine for 30 kW Microturbine

    Directory of Open Access Journals (Sweden)

    Sangsawangmatum Thanate

    2017-01-01

    Full Text Available Microturbines are small gas turbines that have the capacity range of 25-300 kW. The main components of microturbine are compressor, turbine, combustor and recuperator. This research paper focuses on the design of radial inflow turbine that operates in 30 kW microturbine. In order to operate the 30 kW microturbine with the back work ratio of 0.5, the radial inflow turbine should be designed to produce power at 60 kW. With the help of theory of turbo-machinery and the analytical methods, the design parameters are derived. The design results are constructed in 3D geometry. The 3D fluid-geometry is validated by computational fluid dynamics (CFD simulation. The simulation results show the airflow path, the temperature distribution, the pressure distribution and Mach number. According to the simulation results, there is no flow blockage between vanes and no shock flow occurs in the designed turbine.

  19. Testing and further development of a solar absorption cooling plant

    Science.gov (United States)

    Amannsberger, K.; Heckel, H.; Kreutmair, J.; Weber, K. H.

    1984-12-01

    Ammonia water absorption cooling units using the process heat of line-focusing solar collectors were developed and tested. Reduction of the evaporation temperature to minus 10 C; development of an air-cooled rectifying device for the refrigerant vapor; dry cooling of absorber and condenser by natural draft; refrigerating capacities of 14 to 10 kW which correspond to air temperatures of 25 to 40 C and 24 kW power consumption to heat the machine; auxiliary power requirement 450 W; full compatibility with changing heat input and air temperature, adaptation by automatic stabilization effects; and power optimization under changing boundary conditions by a simple regulating procedure independent of auxiliary power are achieved. The dynamic behavior of the directly linked collector-refrigeration machine system was determined. Operating conditions, market, and economic viability of solar cooling in third-world countries are described. Ice production procedures using absorption cooling units are demonstrated.

  20. JAERI 10kW High Power ERL-FEL and Its Applications in Nuclear Energy Industries

    CERN Document Server

    Minehara, E J; Iijima, H; Kikuzawa, N; Nagai, R; Nishimori, N; Nishitani, T; Sawamura, M; Yamauchi, T

    2005-01-01

    The JAERI high power ERL-FEL has been extended to the more powerful and efficient free-electron laser (FEL) than 10kW for nuclear energy industries, and other heavy industries like defense, shipbuilding, chemical industries, environmental sciences, space-debris, and power beaming and so on. In order to realize such a tunable, highly-efficient, high average power, high peak power and ultra-short pulse FEL, we need the efficient and powerful FEL driven by the JAERI compact, stand-alone and zero boil-off super-conducting RF linac with an energy-recovery geometry. Our discussions on the ERL-FEL will cover the current status of the 10kW upgrading and its applications of non-thermal peeling, cutting, and drilling to decommission the nuclear power plants, and to demonstrate successfully the proof of principle prevention of cold-worked stress-corrosion cracking failures in nuclear power reactors under routine operation using small cubic low-Carbon stainless steel samples.

  1. The Low Temperature CFB Gasifier - Further Test Results and Possible Applications

    DEFF Research Database (Denmark)

    Stoholm, P.; Nielsen, Rasmus Glar; Sarbæk, L.

    2002-01-01

    located in the CFB particle re-circulation path. The 50 kW test plant was built and commissioned during 1999 and since then experiences have been gained from more than 80 hours of operation. Nearly all of the test work has been performed on fuel that is expected to be worst-case conditions, i.e. the fuel...

  2. Design aspects of 13.56MHz, 1kW, CW-RF oscillator for plasma production

    International Nuclear Information System (INIS)

    Kumar, Sunil; Kadia, Bhavesh; Singh, Raj; Varia, Atul; Srinivas, Y S S; Kulkarni, S V

    2010-01-01

    RF produced plasma has many applications in plasma processing and also it is useful in studying the fundamental characteristics of the plasma. A 1KW RF Hartley oscillator is designed and tested at 13.56 MHz. This has been built at RF section of Institute for Plasma Research by using EIMAC (3CX1200A7) triode tube. The RF source is operated in the grounded cathode mode. Triode 3CX1200A7 is operated in class AB and the feedback is Cathode grounded. The tube has sufficient margin in terms of plate dissipation and Grid dissipation that makes it suitable to withstand momentarily load mismatch. To optimize the RF source along with HVDC power supply many mechanical and electrical aspects have been thought of to enhance the overall quality of the system. This source mainly has three sections (The RF section, HVDC Power supply and soft start Filament Power supply). The system is compact and is housed in a 80 cm x 60 cm x 1800 cm aluminum panel. This paper describes the specifications, design criteria, circuit used, operating parameters of 1KW Oscillator along with HVDC power supply with necessary interlocks, tests conducted and results obtained of this 1 KW grounded grid Hartley Oscillator on 50 ohm dummy load. This system has been tested for 8 hours of continuous operation without any appreciable deterioration of the RF output power.

  3. 3 kW single stage all-fiber Yb-doped single-mode fiber laser for highly reflective and highly thermal conductive materials processing

    Science.gov (United States)

    Ikoma, S.; Nguyen, H. K.; Kashiwagi, M.; Uchiyama, K.; Shima, K.; Tanaka, D.

    2017-02-01

    A 3 kW single stage all-fiber Yb-doped single-mode fiber laser with bi-directional pumping configuration has been demonstrated. Our newly developed high-power LD modules are employed for a high available pump power of 4.9 kW. The length of the delivery fiber is 20 m which is long enough to be used in most of laser processing machines. An output power of 3 kW was achieved at a pump power of 4.23 kW. The slope efficiency was 70%. SRS was able to be suppressed at the same output power by increasing ratio of backward pump power. The SRS level was improved by 5dB when 57% backward pump ratio was adopted compared with the case of 50%. SRS was 35dB below the laser power at the output power of 3 kW even with a 20-m delivery fiber. The M-squared factor was 1.3. Single-mode beam quality was obtained. To evaluate practical utility of the 3 kW single-mode fiber laser, a Bead-on-Plate (BoP) test onto a pure copper plate was executed. The BoP test onto a copper plate was made without stopping or damaging the laser system. That indicates our high power single-mode fiber lasers can be used practically in processing of materials with high reflectivity and high thermal conductivity.

  4. 10 kW Contactless Power Transfer System for Rapid Charger of Electric Vehicle

    OpenAIRE

    Yamanaka, Tomohiro; Kaneko, Yasuyoshi; Abe, Shigeru; Yasuda, Tomio

    2012-01-01

    A contactless power transfer system for charging electric vehicles requires a high efficiency, a large air gap, and a good tolerance to lateral misalignment and needs to be compact and lightweight. A double-sided winding 10 kW transformer based on a 1.5 kW H-shaped core transformer was developed for a rapid charger. Even though the transformer capacity was increased, the dimensions of the 10 kW transformer were almost the same as those of the 1.5 kW transformer. In this paper, the design conc...

  5. Experimental test of a supercritical helium heat exchanger dedicated to EUROTRANS 150 kW CW power coupler

    Science.gov (United States)

    Souli, M.; Fouaidy, M.; Hammoudi, N.

    2010-05-01

    The coaxial power coupler needed for beta = 0.65 superconducting RF cavities used in the high energy section of the EUROTRANS driver should transmit 150 kW (CW operation) RF power to the proton beam. The estimated RF losses on the power coupler outer conductor in standing wave mode operation are 46 W. To remove these heat loads, a full scale copper coil heat exchanger brazed around the outer conductor was designed and tested using supercritical helium at T = 6 K as a coolant. Our main objective was to minimise the heat loads to cold extremity of SRF cavity maintained at 2 K or 4.2 K. A dedicated test facility named SUPERCRYLOOP was developed and successfully operated in order to measure the performance of the cold heat exchanger. The test cell used reproduces the realistic thermal boundary conditions of the power coupler mounted on the cavity in the cryomodule. After a short introduction, a brief discussion about the problem of power coupler cooling systems in different machines is made. After that, we describe the experimental set-up and test apparatus. Then, a heat exchanger thermal model will be developed with FEM code COSMOS/M to estimate the different heat transfer coefficients by comparison between numerical simulation results and experimental data in order to validate the design. Finally, thermo-hydraulic behavior of supercritical helium has been investigated as function of different parameters (inlet pressure, flow rate, heat loads).

  6. Performance tests of the 600-kW cw, 80-MHz, radio-frequency systems for the FMIT accelerator

    International Nuclear Information System (INIS)

    Nylander, R.F.; Bacci, F.F.; Fazio, M.V.; Rodgers, J.D.

    1983-01-01

    The high-power rf system for the Fusion Materials Irradiation Test (FMIT) accelerator consists of 14 sets of equipment,** each of which can deliver up to 600 kW (cw) at 80 MHz into a load having a VSWR of 1.4 or less (any phase). The equipment was designed and constructed to FMIT specifications by Continental Electronics Mfg. Co. (CEMC) of Dallas, Texas. Four sets have been shipped to Los Alamos for use with the accelerator (two with the radio-frequency quadrupole (RFQ) and two with the drift-tube linac (DTL)). The first set was fully tested at CEMC; results are summarized. Further tests conducted at Los Alamos, both into a resistive (electrolytic) load and into a resonant cavity (Q about 21,000), have confirmed that this system meets, and in most cases far exceeds, the specified performance limits. The first of the 13 production sets also was tested at CEMC before shipping any of the rf equipment to the Hanford Engineering and Development Laboratory at Richland, Washington. Because of the differences in behavior observed when No. 1 was operated at Los Alamos with a different tube installed in the final power amplifier (FPA) cavity, CEMC agreed to test No. 5 with two tubes having widely differing characteristics (notably primary screen emission). As expected, behavior differed markedly, and some design modification was necessary to meet all specifications with either tube. Results of final performance tests on No. 5 are summarized. As noted in the table, detailed test results are presented in the CEMC Acceptance Test Reports (ATRs) dated April 7, 1982 and January 3, 1983. Discussion of the most significant aspects of CEMC's tests and of those performed at Los Alamos follows a brief description of the equipment

  7. Development of a wind energy converter and investigation of its operational function. Part 4: Test setup and results of measurement

    Science.gov (United States)

    Armbrust, S.; Molly, J. P.

    1982-12-01

    Measurements made during test operations at the MODA.10 plant as well as at a 25 years old 6 kW wind energy converter are presented. The test arrangements, measurement results of both wind energy converters, and the experience gained are described.

  8. A 10kW series resonant converter design, transistor characterization, and base-drive optimization

    Science.gov (United States)

    Robson, R.; Hancock, D.

    1981-01-01

    Transistors are characterized for use as switches in resonant circuit applications. A base drive circuit to provide the optimal base drive to these transistors under resonant circuit conditions is developed and then used in the design, fabrication and testing of a breadboard, spaceborne type 10 kW series resonant converter.

  9. Development of a Wood Powder Fuelled 35 kW Stirling CHP Unit

    DEFF Research Database (Denmark)

    PÃ¥lsson, M.; Carlsen, Henrik

    2003-01-01

    For biomass fuelled CHP in sizes below 100 kW, Stirling engines are the only feasible alternative today. Using wood powder as fuel, the Stirling engine can be heated directly by the flame like when using a gaseous or liquid fuel burner. However, the combustion chamber will have to be much larger...... recirculation (CGR) a smaller air preheater can be used, while system efficiency will increase compared with using excess air for flame cooling. In a three-year project, a wood powder fuelled Stirling engine CHP unit will be developed and run in field test. The project will use the double-acting four......-cylinder Stirling engine SM3D with an electric output of 35 kW. This engine is a further development of the engine SM3B that has been developed at the Technical University of Denmark. The engine heater is being adapted for use with wood powder as fuel. During a two-year period a combustion system for this engine...

  10. Stand-alone version of the 11kW Gaia wind turbine

    Energy Technology Data Exchange (ETDEWEB)

    Bindner, H.; Rosas, P.A.C.; Teodorescu, R.; Blaabjerg, F.

    2004-09-15

    This report describes the development of a stand-alone version of the 11kW Gaia wind turbine. Various possible configurations are investigated and a configuration using a back-to-back converter is chosen. A model is developed for controller design of the fast controllers of the unit. Controllers are designed and a prototype is built for testing. The report documents the performance of the prototype through measurements done on the full scale prototype installed in a test facility where it has been tested both as a standalone unit and in parallel with a diesel genset. For system wide power quality assessment and controller design a dynamic performance assessment model has been developed. (au)

  11. New plant construction cost and schedule

    International Nuclear Information System (INIS)

    Akins, M. J.

    2009-01-01

    The presentation covers the following topics: cost structure; capital costs; variation of capital costs; trends in power plant construction; studies of costs completion; periods and risks. Nuclear plant costs have recently risen so rapidly that vendors are not willing to publicly commit to cost estimates: ∼ $2000/Kw overnight costs in 2006 in the US market > $4000/Kw and in 2008 in the US market > $6000/Kw in 2008 in emerging markets. There is vendors pricing uncertainty. Current contract models may not apply. Current construction projects have problems: Olkiluoto-3 is reported to be 50% over budget and two years behind schedule, increasing perceptions that nuclear costs will continue to increase rapidly; Price of materials is a big volatile unknown, which may decrease Labor could become more available due to limited number of new projects; Lack of debt/credit to finance new project may decrease demand of new construction

  12. Electric propulsion options for 10 kW class earth space missions

    Science.gov (United States)

    Patterson, M. J.; Curran, Francis M.

    1989-01-01

    Five and 10 kW ion and arcjet propulsion system options for a near-term space demonstration experiment have been evaluated. Analyses were conducted to determine first-order propulsion system performance and system component mass estimates. Overall mission performance of the electric propulsion systems was quantified in terms of the maximum thrusting time, total impulse, and velocity increment capability available when integrated onto a generic spacecraft under fixed mission model assumptions. Maximum available thrusting times for the ion-propelled spacecraft options, launched on a DELTA II 6920 vehicle, range from approximately 8,600 hours for a 4-engine 10 kW system to more than 29,600 hours for a single-engine 5 kW system. Maximum total impulse values and maximum delta-v's range from 1.2x10(7) to 2.1x10(7) N-s, and 3550 to 6200 m/s, respectively. Maximum available thrusting times for the arcjet propelled spacecraft launched on the DELTA II 6920 vehicle range from approximately 528 hours for the 6-engine 10 kW hydrazine system to 2328 hours for the single-engine 5 kW system. Maximum total impulse values and maximum delta-v's range from 2.2x10(6) to 3.6x10(6) N-s, and approximately 662 to 1072 m/s, respectively.

  13. Electric Propulsion Options for 10 kW Class Earth-Space Missions

    Science.gov (United States)

    Patterson, M. J.; Curran, Francis M.

    1989-01-01

    Five and 10 kW ion and arcjet propulsion system options for a near-term space demonstration experiment were evaluated. Analyses were conducted to determine first-order propulsion system performance and system component mass estimates. Overall mission performance of the electric propulsion systems was quantified in terms of the maximum thrusting time, total impulse, and velocity increment capability available when integrated onto a generic spacecraft under fixed mission model assumptions. Maximum available thrusting times for the ion-propelled spacecraft options, launched on a DELTA 2 6920 vehicle, range from approximately 8,600 hours for a 4-engine 10 kW system to more than 29,600 hours for a single-engine 5 kW system. Maximum total impulse values and maximum delta-v's range from 1.2x10 (exp 7) to 2.1x10 (exp 7) N-s, and 3550 to 6200 m/s, respectively. Maximum available thrusting times for the arcjet propelled spacecraft launched on the DELTA 2 6920 vehicle range from approximately 528 hours for the 6-engine 10 kW hydrazine system to 2328 hours for the single-engine 5 kW system. Maximum total impulse values and maximum delta-v's range from 2.2x10 (exp 6) to 3.6x10 (exp 6) N-s, and approximately 662 to 1072 m/s, respectively.

  14. Design study of wind turbines 50 kW to 3000 kW for electric utility applications. Volume 1: Summary report

    Science.gov (United States)

    1976-01-01

    Wind turbine configurations that would lead to generation of electrical power in a cost effective manner were considered. All possible overall system configurationss, operating modes, and sybsystem concepts were evaluated for both technical feasibility and compatibility with utility networks, as well as for economic attractiveness. A design optimization computer code was developed to determine the cost sensitivity of the various design features, and thus establish the configuration and design conditions that would minimize the generated energy costs. The preliminary designs of both a 500 kW unit and a 1500 kW unit operating in a 12 mph and 18 mph median wind speed respectively, were developed. The rationale employed and the key findings are summarized.

  15. Dynamic simulation of a direct carbonate fuel cell power plant

    Energy Technology Data Exchange (ETDEWEB)

    Ernest, J.B. [Fluor Daniel, Inc., Irvine, CA (United States); Ghezel-Ayagh, H.; Kush, A.K. [Fuel Cell Engineering, Danbury, CT (United States)

    1996-12-31

    Fuel Cell Engineering Corporation (FCE) is commercializing a 2.85 MW Direct carbonate Fuel Cell (DFC) power plant. The commercialization sequence has already progressed through construction and operation of the first commercial-scale DFC power plant on a U.S. electric utility, the 2 MW Santa Clara Demonstration Project (SCDP), and the completion of the early phases of a Commercial Plant design. A 400 kW fuel cell stack Test Facility is being built at Energy Research Corporation (ERC), FCE`s parent company, which will be capable of testing commercial-sized fuel cell stacks in an integrated plant configuration. Fluor Daniel, Inc. provided engineering, procurement, and construction services for SCDP and has jointly developed the Commercial Plant design with FCE, focusing on the balance-of-plant (BOP) equipment outside of the fuel cell modules. This paper provides a brief orientation to the dynamic simulation of a fuel cell power plant and the benefits offered.

  16. Development of a Solid State RF Amplifier in the kW Regime for Application with Low Beta Superconducting RF Cavities

    CERN Document Server

    Piel, Christian; Borisov, A; Kolesov, Sergej; Piel, Helmut

    2005-01-01

    Projects based on the use of low beta superconducting cavities for ions are under operation or development at several labs worldwide. Often these cavities are individually driven by RF power sources in the kW regime. For an ongoing project a modular 2 kW, 176 MHz unconditionally stable RF amplifier for CW and pulsed operation was designed, built, and tested. Extended thermal analysis was used to develop a water cooling system in order to optimize the performance of the power transistors and other thermally loaded components. The paper will outline the design concept of the amplifier and present first results on the test of the amplifier with a superconducting cavity.

  17. Electron beam welding of heavy thicknesses with a 200 KW gun

    International Nuclear Information System (INIS)

    Binard, J.; Ducrot, A.

    1986-09-01

    In this report, we describe our 200 kW gun, 100 m 3 vacuum chamber E B welding equipment, implemented since 1985 to increase the process development in the heavy mechanics; to score the goal, we study the influence of parameters as: welding positions, chemical analysis of the material and workpiece thickness. Simultaneously, we carry out welding tests of branch pipes or nozzles on tubes and shells. Some results are shown and good mechanical properties are obtained on thicknesses up to 300 mm

  18. Producer gas fuelling of a 20kW output engine by gasification of solid biomass

    Energy Technology Data Exchange (ETDEWEB)

    Hollingdale, A C; Breag, G R; Pearce, D

    1988-11-01

    Motive power requirements in the range up to 100 kW shaft power are common in developing country processing operations. Producer gas-fuelled systems based upon a relatively cheap and simple manually operated gasifier or reactor using readily available biomass feedstock can offer in some cases an attractive alternative to fossil-fuelled power units. This bulletin outlines research and development work by the Industrial Development Department of the Overseas Development Natural Resources Institute for 20 kW shaft power output from producer gas derived from solid biomass. Biomass materials such as wood or shells can be carbonized to form charcoal or left in the natural uncarbonized state. In this work both carbonized and uncarbonized biomass fuel has been used to provide producer gas to fuel a Ford 2274E engine, an industrial version of a standard vehicle spark-ignition engine. Cross-draught and down-draught reactor designs were evaluated during trials with this engine. Also different gas cleaning and cooling arrangements were tested. Particular emphasis was placed on practical aspects of reactor/engine operation. This work follows earlier work with a 4 kW shaft power output system using charcoal-derived producer gas. (author).

  19. Study Improving Performance of Centrifugal Compressor In Paiton Coal Fired Power Plant Unit 1 And 2

    Science.gov (United States)

    Kusuma, Yuriadi; Permana, Dadang S.

    2018-03-01

    The compressed air system becomes part of a very important utility system in a Plant, including the Steam Power Plant. In PLN’S coal fired power plant, Paiton units 1 and 2, there are four Centrifugal air compressor types, which produce compressed air as much as 5.652 cfm and with electric power capacity of 1200 kW. Electricity consumption to operate centrifugal compressor is 7.104.117 kWh per year. This study aims to measure the performance of Centrifugal Compressors operating in Paiton’s coal fired power plant units 1 and 2. Performance Compressor is expressed by Specific Power Consumption (SPC) in kW/100 cfm. For this purpose, we measure the compressed air flow rate generated by each compressor and the power consumed by each compressor. The result is as follows Air Compressor SAC 2B : 15.1 kW/100 cfm, Air Compressor SAC 1B : 15.31 kW/100 cfm,Air Compressor SAC 1A : 16.3 kW/100 cfm and air Compressor SAC 2C : 18.19 kW/100 cfm. From the measurement result, air compressor SAC 2B has the best performance that is 15.1 kW / 100 cfm. In this study we analyze efforts to improve the performance of other compressors to at least match the performance of the SAC 2B air compressor. By increasing the Specific Power Consumption from others Compressor, it will get energy saving up to 284,165 kWh per year.

  20. Wind power development field test project at Ebetsu plant of Oji Paper Co., Ltd. Close survey on wind conditions; Oji seishi Ebetsu kojo ni okeru furyoku kaihatsu field test jigyo (fukyo seisa) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-11-01

    A survey was made on wind conditions at the Ebetsu plant of Oji Paper Co., Ltd., on the assumption that a demonstrative equipment of a wind power generation system was installed in the plant. The survey period was one year from Oct., 1998 to Sept., 1999. The observations were carried out on the average wind velocity, average wind direction, standard deviation of velocity, and the maximum instantaneous wind velocity. With a fixed point observation at 20 m above ground, and with the minimum observation time unit of 10 minutes, an average value during the 10 minutes was determined as the measurement of each category. However, the maximum instantaneous wind velocity was determined on the measurement with the minimum observation time unit of 2 seconds. The average wind velocity was 3.2 m/s, the maximum wind velocity during the period was 34 m/s, and the prevailing wind direction was SSE (25.6%), while the total occurrence probability on the wind axis with NW-SE as the main axis was 62.9%. The intensity of turbulence was 0.28 at a wind velocity of 2.0 m/s or above and was 0.25 at 4.0 m/s or above. An estimated annual operation rate of a windmill was 37-59% using the rated value of a 150 kW, 300 kW and 750 kW class windmills. (NEDO)

  1. Further studies on South African plants: Acaricidal activity of organic plant extracts against Rhipicephalus (Boophilus) microplus (Acari: Ixodidae)

    CSIR Research Space (South Africa)

    Wellington, Kevin W

    2017-01-01

    Full Text Available -1 Veterinary Parasitology, vol. 234: 10-12 Further studies on South African plants: Acaricidal activity of organic plant extracts against Rhipicephalus (Boophilus) microplus (Acari: Ixodidae) Wellington, KW Leboho, T Sakong, BM Adenubi, OT Eloff, JN...

  2. Basic research using the 250 kW research reactor of the Jozef Stefan Institute

    International Nuclear Information System (INIS)

    Dimic, V.

    1984-01-01

    The 250 kW TRIGA Mark II reactor is a light water reactor with solid fuel elements in which the zirconium hydride moderator is homogeneously distributed between enriched uranium. The reactor therefore has a large prompt negative temperature coefficient of reactivity; the fuel also has a very high retention of radioactive fission products. The experimental facilities include a rotary specimen rack, a central in-core radiation thimble, a pneumatic transfer system and pulsing capability. Other experimental facilities include two radial and two tangential beam tubes, a graphite thermal column and a graphite thermalizing column. At the steady state power of 250 kW the peak flux is 1x10 13 n/cm 2 in the central test position. In addition, pulsing to about 2000 MW is usually provided giving peak fluxes of about 2x10 16 n/cm 2 sec. All TRIGA reactors produce a core-average thermal neutron flux of about 10 7 n.v. per watt. Only with very large accelerators can such high fluxes be achieved. The types of research could be summarized as follows: thermal neutron scattering, neutron radiography, neutron and nuclear physics, activation analysis, radiochemistry, biology and medicine, and teaching and training. Typical applied research with a 250 kW reactor has been conducted in medicine, in biology, archaeology, metallurgy and materials science, engineering and criminology. It is well known that research reactors have been used routinely to produce isotopes for industry and medicine. We can conclude that the 250 kW TRIGA reactor is a useful and wide ranging source of radiation for basic and applied research. The operation cost for this instrument is relatively low. (author)

  3. Development of a 3 kW double-acting thermoacoustic Stirling electric generator

    International Nuclear Information System (INIS)

    Wu, Zhanghua; Yu, Guoyao; Zhang, Limin; Dai, Wei; Luo, Ercang

    2014-01-01

    Highlights: • A 3 kW double-acting thermoacoustic Stirling electric generator is introduced. • 1.57 kW electric power with 16.8% thermal-to-electric efficiency was achieved. • High mechanical damping coefficient greatly decreases the system performance. • Performance difference is significant, which also decreased system performance. - Abstract: In this paper, a double-acting thermoacoustic Stirling electric generator is proposed as a new device capable of converting external heat into electric power. In the system, at least three thermoacoustic Stirling heat engines and three linear alternators are used to build a multiple-cylinder electricity generator. In comparison with the conventional thermoacoustic electricity generation system, the double-acting thermoacoustic Stirling electric generator has advantages on efficiency, power density and power capacity. In order to verify the idea, a prototype of 3 kW three-cylinder double-acting thermoacoustic Stirling electric generator is designed, built and tested. Based on the classic thermoacoustic theory, numerical simulation is performed to obtain the thermodynamic parameters of the engine. And distributions of key parameters are presented for a better understanding of the energy conversion process in the engine. In the experiments, a maximum electric power of about 1.57 kW and a maximum thermal-to-electric conversion efficiency of 16.8% were achieved with 5 MPa pressurized helium and 86 Hz working frequency. However, we find that the mechanical damping coefficient of the piston is dramatically increased due to the deformation of the cylinder wall caused by high thermal stress during the experiments. Thereby, the system performance was greatly reduced. Additionally, the performance differences between three engines and three alternators are significant, such as the heating temperature difference between three heater blocks of the engines, the piston displacement and the output electric power differences between

  4. GASIFICATION PLANT COST AND PERFORMANCE OPTIMIZATION

    Energy Technology Data Exchange (ETDEWEB)

    Samuel S. Tam

    2002-05-01

    The goal of this series of design and estimating efforts was to start from the as-built design and actual operating data from the DOE sponsored Wabash River Coal Gasification Repowering Project and to develop optimized designs for several coal and petroleum coke IGCC power and coproduction projects. First, the team developed a design for a grass-roots plant equivalent to the Wabash River Coal Gasification Repowering Project to provide a starting point and a detailed mid-year 2000 cost estimate based on the actual as-built plant design and subsequent modifications (Subtask 1.1). This unoptimized plant has a thermal efficiency of 38.3% (HHV) and a mid-year 2000 EPC cost of 1,681 $/kW. This design was enlarged and modified to become a Petroleum Coke IGCC Coproduction Plant (Subtask 1.2) that produces hydrogen, industrial grade steam, and fuel gas for an adjacent Gulf Coast petroleum refinery in addition to export power. A structured Value Improving Practices (VIP) approach was applied to reduce costs and improve performance. The base case (Subtask 1.3) Optimized Petroleum Coke IGCC Coproduction Plant increased the power output by 16% and reduced the plant cost by 23%. The study looked at several options for gasifier sparing to enhance availability. Subtask 1.9 produced a detailed report on this availability analyses study. The Subtask 1.3 Next Plant, which retains the preferred spare gasification train approach, only reduced the cost by about 21%, but it has the highest availability (94.6%) and produces power at 30 $/MW-hr (at a 12% ROI). Thus, such a coke-fueled IGCC coproduction plant could fill a near term niche market. In all cases, the emissions performance of these plants is superior to the Wabash River project. Subtasks 1.5A and B developed designs for single-train coal and coke-fueled power plants. This side-by-side comparison of these plants, which contain the Subtask 1.3 VIP enhancements, showed their similarity both in design and cost (1,318 $/kW for the

  5. Efficient pump module coupling >1kW from a compact detachable fiber

    Science.gov (United States)

    Dogan, M.; Chin, R. H.; Fulghum, S.; Jacob, J. H.; Chin, A. K.

    2018-02-01

    In the most developed fiber amplifiers, optical pump power is introduced into the 400μm-diameter, 0.46NA first cladding of the double-clad, Yb-doped, gain fiber, using a (6+1):1 multi-mode fiber combiner. For this configuration, the core diameter and numerical aperture of the pump delivery fibers have maximum values of 225μm and 0.22, respectively. This paper presents the first fiber-coupled laser-diode pump module emitting more than 1kW of claddingmode- stripped power from a detachable 225μm, 0.22NA delivery fiber at 976nm. The electrical-to-optical power conversion efficiency at 1kW is 50%. The FWHM spectral width at 1kW output is 4nm and has an excellent overlap with the narrow absorption spectrum of ytterbium in glass. Six of these pump modules attached to a (6+1):1 multimode combiner enable a 5-6kW, single-mode, Yb-doped fiber amplifier.

  6. ADDING ECOLOGICAL REALISM TO PLANT TESTING

    Science.gov (United States)

    Current test protocols for the protection of nontarget plants used when registering pesticides in the United States and many other countries depend on two tests using greenhouse grown, agricultural seedling plants. The seedling emergence and vegetative vigor tests are used to as...

  7. Development of an Innovative 2.5 kW Water-Silica Gel Adsorption Chiller

    Energy Technology Data Exchange (ETDEWEB)

    Bakker, E.J.; De Boer, R.; Smeding, S.F.; Sijpheer, N.C.; Van der Pal, M.

    2013-10-15

    Besides (better) utilization of available solar heat or waste heat, and thereby reduction of fossil fuel consumption, sorption cooling offers several other advantages compared to conventional compression cooling. Such as reduction of summer peaks in the electricity grid, use of natural refrigerants, and low noise and maintenance. Sorption cooling in itself is not a new development. However, the development of small scale sorption chillers (2-20 kW) is new. This development allows sorption cooling to enter the markets for individual homes, small collective systems and small commercial applications. A second trend is gradual reduction of the driving temperatures of the sorption cycles allowing more solar and waste heat to be used. This article describes the design and performance of a new, innovative 2.5 kW adsorption chiller, developed by ECN. This system was built and tests have been performed in a laboratory and in one of ECN's full-scale research houses.

  8. Day-Ahead Scheduling of a Photovoltaic Plant by the Energy Management of a Storage System

    DEFF Research Database (Denmark)

    Marinelli, Mattia; Sossan, Fabrizio; Isleifsson, Fridrik Rafn

    2013-01-01

    The paper discusses and describes a system for energy management of a 10 kW PV plant coupled with a 15 kW - 190 kWh storage system. The overall idea is, by knowing the meteorological forecast for the next 24h, to dispatch the PV system and to be able to grant the scheduled hourly energy profile...... by a proper management of the storage. Due to forecast inaccuracies, the energy manager controls the storage in order to ensure that the plan for hourly energy production is respected, minimizing the storage itself usage. The experimental study is carried out in SYSLAB, a distributed power system test...

  9. Efficient 10 kW diode-pumped Nd:YAG rod laser

    Science.gov (United States)

    Akiyama, Yasuhiro; Takada, Hiroyuki; Sasaki, Mitsuo; Yuasa, Hiroshi; Nishida, Naoto

    2003-03-01

    As a tool for high speed and high precision material processing such as cutting and welding, we developed a rod-type all-solid-state laser with an average power of more than 10 kW, an electrical-optical efficiency of more than 20%, and a laser head volume of less than 0.05 m3. We developed a highly efficient diode pumped module, and successfully obtained electrical-optical efficiencies of 22% in CW operation and 26% in QCW operation at multi-kW output powers. We also succeeded to reduce the laser head volume, and obtained the output power of 12 kW with an efficiency of 23%, and laser head volume of 0.045 m3. We transferred the technology to SHIBAURA mechatronics corp., who started to provide the LD pumped Nd:YAG laser system with output power up to 4.5 kW. We are now continuing development for further high power laser equipment.

  10. First 200 kW CW operation of a 60 GHz gyrotron

    International Nuclear Information System (INIS)

    Jory, H.; Bier, R.; Evans, S.; Felch, K.; Fox, L.; Huey, H.; Shively, J.; Spang, S.

    1983-01-01

    The gyrotron is a microwave tube which employs the electron cyclotron maser interaction to produce high power output at millimeter wavelengths. It has important and growing applications for heating of plasmas in controlled thermonuclear fusion experiments. The Varian 60 GHz gyrotron has recently generated microwave power in excess of 200 kW during CW operation, wth excellent dynamic range and operating stability. This is the highest average power ever produced by a microwave tube in the millimeter wave region. A description of the gyrotron design and test results are presented

  11. Beam Transport Devices for the 10 kW IR Free Electron Laser

    International Nuclear Information System (INIS)

    Lawrence Dillon-Townes; Michael Bevins; David Kashy; Stephanie Slachtouski; Ronald Lassiter; George Neil; Michelle Shinn; Joseph Gubeli; Christopher Behre; David Douglas; David W. Waldman; George Biallas; Lawrence Munk; Christopher Gould

    2005-01-01

    Beam transport components for the 10kW IR Free Electron Laser (FEL) at Thomas Jefferson National Accelerator Facility (Jefferson Lab) were designed to manage (1) electron beam transport and (2) photon beam transport. An overview of the components will be presented in this paper. The electron beam transport components were designed to address RF heating, maintain an accelerator transport vacuum of 1 x 10 -8 torr, deliver photons to the optical cavity, and provide 50 kW of beam absorption during the energy recovery process. The components presented include a novel shielded bellows, a novel zero length beam clipper, a one decade differential pumping station with a 7.62 cm (3.0 inch) aperture, and a 50 kW beam dump. The photon beam transport components were designed to address the management of photons delivered by the accelerator transport. The optical cavity manages the photons and optical transport delivers the 10 kW of laser power to experimental labs. The optical cavity component presented is a unique high reflector vessel and the optical transport component presented is a turning mirror cassette

  12. Output characteristics of 40 kW photovoltaic power generation system in ICT; Ibaraki kosen ni okeru 40 kW taiyoko hatsuden shisutemu no shutsuryoku tokusei

    Energy Technology Data Exchange (ETDEWEB)

    Sekiguchi, N. [Ibaraki National College of Tech., Ibaraki (Japan); Tani, T. [Science University of Tokyo, Tokyo (Japan)

    1999-11-25

    The photovoltaic power generation system consists of photovoltaic array and power conditioner of the utility connected system. The photovoltaic array parallelly constitutes 18 serial 30 of the modules of 540 sheets, and there is the generating capacity of largest 40 kW. The power conditioner uses 10 kW four units, and it is tracking with function of the maximum output point. This report examined the unconformable rate of photovoltaic array maximum output operating voltage, current and power in simulation and power conditioner input. (author)

  13. FY 1992 report on the results of the demonstration test on the methanol conversion at oil-fired power plant. Demonstration test on a methanol reformation type power generation total system; 1992 nendo sekiyu karyoku hatsudensho metanoru tenkan tou jissho shiken. Metanoru kaishitsu gata hatsuden total system jissho shiken

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-01

    For the promotion of introduction of methanol to oil-fired power plant, based on the results of the element study, operational study was conducted of a 1,000kW class total system plant for which each of the elements was combined, and the FY 1992 results were summarized. In the operational study, data on various kinds of operational study were sampled of each of the simple cycle/regeneration cycle of liquid methanol and simple cycle/regeneration cycle of gas methanol. As to the reformed gas/water injection/regeneration cycle, all functions as a total system plant worked normally, and it was confirmed that the reformed gas/water injection/regeneration cycle operation could be made possible. Besides, the following were conducted: confirmation test on the performance of the developmental catalyst used in the operational study by bench-scale test device, trial operation for adjustment of gas turbine and combustion study such as the performance test in each cycle, manufacture/study of catalyst for the total system, study for longevity of catalyst for the total system, etc. (NEDO)

  14. Homecell: design and development of a 2 kW fuel cell based electric energy generating system, for the domestic market

    Energy Technology Data Exchange (ETDEWEB)

    Bordallo, C.R.; Moreno, E.; Brey, J.J.; Garcia, C.; Castro, A.; Sarmiento, B. [Hynergreen Technologies, S.A., Seville (Spain)

    2004-07-01

    'Full text:' Even though fuel cell technology has been known in industry for decades now, it has come to the fore in recent years hand in hand with renewable energy sources and the hydrogen vector, as a clean, reliable and efficient electric energy source. Within the stationary applications of fuel cells, the production of high output electric energy has always stood out and this could range from several hundreds of watts to megawatts to supply large plants. The objective of this project is to develop, construct and experimentally validate an electric energy generating system for domestic applications of up to 2 kW. This is due to the fact that multiple domestic applications currently exist for which an electric output of 2 kW is sufficient. On the other hand, an electricity supply might not exist, or might be deficient; and this system will enable electricity supply even under these circumstances. Moreover, the existing system is very versatile and could be complemented with other hydrogen production ones (using photovoltaic energy for example), or else two systems could be used in parallel if outputs up to 4 kW were required, and other applications in other markets, such as telecommunications or tele-metering systems, could be undertaken. (author)

  15. Spent fuel consolidation in the 105KW Building fuel storage basin

    International Nuclear Information System (INIS)

    Johnson, B.H.

    1994-01-01

    This study is one element of a larger engineering study effort by WHC to examine the feasibility of irradiated fuel and sludge consolidation in the KW Basin in response to TPA Milestone (target date) M-34-00-T03. The study concludes that up to 11,500 fuel storage canisters could be accommodated in the KW Basin with modifications. These modifications would include provisions for multi-tiered canister storage involving the fabrication and installation of new storage racks and installation of additional decay heat removal systems for control of basin water temperature. The ability of existing systems to control radionuclide concentrations in the basin water is examined. The study discusses requirements for spent nuclear fuel inventory given the proposed multi-tiered storage arrangement, the impact of the consolidated mass on the KW Basin structure, and criticality issues associated with multi-tiered storage

  16. Vibration monitoring and fault diagnostics of a 45 kW motor

    International Nuclear Information System (INIS)

    Hafeez, T.; Ahmed, A.; Chohan, G.Y.

    2003-01-01

    Overheating, high noise and vibrations were observed in a 45 kW induction motor of a chilled water pump in an air conditioning plant. The vibration amplitudes along with phase angles were obtained with the help of a data collector. The vibration spectra obtained was further analyzed to diagnose the problem. The user had reported high vibrations in motor since the day of its installation. The frequency peaks and phase data has revealed the possibility of structural resonance, and misalignment in rotor bearing assembly. The problem of eccentric housing bore on non-drive end NDE that resulted in the misalignment of motor shaft in housing assembly. The spectra and phase data is presented and discussed to diagnose the motor problems. The re-monitoring of motor after rectification of manufacturing fault has confirmed the right diagnoses. (author)

  17. Design study of wind turbines 50 kW to 3000 kW for electric utility applications: Analysis and design

    Science.gov (United States)

    1976-01-01

    In the conceptual design task, several feasible wind generator systems (WGS) configurations were evaluated, and the concept offering the lowest energy cost potential and minimum technical risk for utility applications was selected. In the optimization task, the selected concept was optimized utilizing a parametric computer program prepared for this purpose. In the preliminary design task, the optimized selected concept was designed and analyzed in detail. The utility requirements evaluation task examined the economic, operational, and institutional factors affecting the WGS in a utility environment, and provided additional guidance for the preliminary design effort. Results of the conceptual design task indicated that a rotor operating at constant speed, driving an AC generator through a gear transmission is the most cost effective WGS configuration. The optimization task results led to the selection of a 500 kW rating for the low power WGS and a 1500 kW rating for the high power WGS.

  18. Fission Surface Power Technology Demonstration Unit Test Results

    Science.gov (United States)

    Briggs, Maxwell H.; Gibson, Marc A.; Geng, Steven M.; Sanzi, James L.

    2016-01-01

    The Fission Surface Power (FSP) Technology Demonstration Unit (TDU) is a system-level demonstration of fission power technology intended for use on manned missions to Mars. The Baseline FSP systems consists of a 190 kWt UO2 fast-spectrum reactor cooled by a primary pumped liquid metal loop. This liquid metal loop transfers heat to two intermediate liquid metal loops designed to isolate fission products in the primary loop from the balance of plant. The intermediate liquid metal loops transfer heat to four Stirling Power Conversion Units (PCU), each of which produce 12 kWe (48 kW total) and reject waste heat to two pumped water loops, which transfer the waste heat to titanium-water heat pipe radiators. The FSP TDU simulates a single leg of the baseline FSP system using an electrically heater core simulator, a single liquid metal loop, a single PCU, and a pumped water loop which rejects the waste heat to a Facility Cooling System (FCS). When operated at the nominal operating conditions (modified for low liquid metal flow) during TDU testing the PCU produced 8.9 kW of power at an efficiency of 21.7 percent resulting in a net system power of 8.1 kW and a system level efficiency of 17.2 percent. The reduction in PCU power from levels seen during electrically heated testing is the result of insufficient heat transfer from the NaK heater head to the Stirling acceptor, which could not be tested at Sunpower prior to delivery to the NASA Glenn Research Center (GRC). The maximum PCU power of 10.4 kW was achieved at the maximum liquid metal temperature of 875 K, minimum water temperature of 350 K, 1.1 kg/s liquid metal flow, 0.39 kg/s water flow, and 15.0 mm amplitude at an efficiency of 23.3 percent. This resulted in a system net power of 9.7 kW and a system efficiency of 18.7 percent.

  19. Development of a 0.1 kW thermoelectric power generator for military applications

    International Nuclear Information System (INIS)

    Menchen, W.R.

    1986-01-01

    A man-portable thermoelectric power source is being developed for the U.S. Army. Initially used as a dedicated power supply for the XM-21 Chemical Agent Alarm System, the set can also meet a variety of general purpose user requirements. Development of a thermoelectric power conversion device is being undertaken by the U.S. Army LABCOM Electronics Technology and Devices Laboratory to fill a need for a generator that is silent, lightweight, multi-fueled and reliable. The 0.1 kW Power Generator is rectangular in configuration and consists of a power module, electronic control assembly and fuel delivery system housed within a tubular structural frame. The generator operates on military fuels ranging from kerosene to diesel oil. Multi-fuel capability is achieved using an ultrasonic atomizer and regenerative burner developed specifically for this application. This paper provides the first public presentation of results achieved during the Advanced Development Phase of the 0.1 kW Power Generator. The development process is briefly traced with emphasis on a description of the system and test results obtained to date

  20. Design and development of 75 MHz 1 kW RF system with micro-controller based protection and control

    International Nuclear Information System (INIS)

    Rosily, Sherry; Pande, Manjiri; Handu, V.K.

    2011-01-01

    A 75 MHz, 1 kW Radio Frequency (RF) system has been successfully tested on a 50 ohm load, along with a microcontroller based protection circuit for protection of the system against the possible problems that may occur during RF power coupling to Radio Frequency Quadrapole (RFQ) load. This paper describes major challenges faced during the development and methods by which they have been overcome. Measurement of the tube anode temperature which is at 4 kV dc and 1 kW RF power is one of these. Confidence provided by these successful experiences has inspired an exploration of possibilities for further enhancement of the present system. These are also discussed in the paper. (author)

  1. ETL 1 kW redox flow cell

    International Nuclear Information System (INIS)

    Nozaki, K.; Ozawa, T.

    1984-01-01

    A 1 kW scale redox flow cell system was set up in the laboratory (ETL), while three different types of batteries were also assembled by private companies in early 1983. In this article, this cell system is described. The concept of a modern type redox flow cell is based on a couple of fully soluble redox ions and a highly selective ion-exchange membrane. In the cell, the redox ion stored in a tank is flowed to and reduced on the electrode, while the other ion is also flowed to and oxidized on the other electrode. This electrochemical reaction produces electronic current in the external circuit and ionic current through the membrane sandwiched as a separator between the two electrodes. The reverse reaction proceeds in the charging process. In ETL, the concept was preliminarily tested, and conceptual design and cost estimation of the redox flow cells were carried out to confirm the feasibility; the R and D started on these bases in 1975

  2. OSR encapsulation basis -- 100-KW

    International Nuclear Information System (INIS)

    Meichle, R.H.

    1995-01-01

    The purpose of this report is to provide the basis for a change in the Operations Safety Requirement (OSR) encapsulated fuel storage requirements in the 105 KW fuel storage basin which will permit the handling and storing of encapsulated fuel in canisters which no longer have a water-free space in the top of the canister. The scope of this report is limited to providing the change from the perspective of the safety envelope (bases) of the Safety Analysis Report (SAR) and Operations Safety Requirements (OSR). It does not change the encapsulation process itself

  3. Test requirements for the integral effect test to simulate Korean PWR plants

    Energy Technology Data Exchange (ETDEWEB)

    Song, Chul Hwa; Park, C. K.; Lee, S. J.; Kwon, T. S.; Yun, B. J.; Chung, M. K

    2001-02-01

    In this report, the test requirements are described for the design of the integral effect test facility to simulate Korean PWR plants. Since the integral effect test facility should be designed so as to simulate various thermal hydraulic phenomena, as closely as possible, to be occurred in real plants during operation or anticipated transients, the design and operational characteristics of the reference plants (Korean Standard Nuclear Plant and Korean Next Generation Reactor)were analyzed in order to draw major components, systems, and functions to be satisfied or simulated in the test facility. The test matrix is set up by considering major safety concerns of interest and the test objectives to confirm and enhance the safety of the plants. And the analysis and prioritization of the test matrix leads to the general design requirements of the test facility. Based on the general design requirements, the design criteria is set up for the basic and detailed design of the test facility. And finally it is drawn the design requirements specific to the fluid system and measurement system of the test facility. The test requirements in this report will be used as a guideline to the scaling analysis and basic design of the test facility. The test matrix specified in this report can be modified in the stage of main testing by considering the needs of experiments and circumstances at that time.

  4. Test requirements for the integral effect test to simulate Korean PWR plants

    International Nuclear Information System (INIS)

    Song, Chul Hwa; Park, C. K.; Lee, S. J.; Kwon, T. S.; Yun, B. J.; Chung, M. K.

    2001-02-01

    In this report, the test requirements are described for the design of the integral effect test facility to simulate Korean PWR plants. Since the integral effect test facility should be designed so as to simulate various thermal hydraulic phenomena, as closely as possible, to be occurred in real plants during operation or anticipated transients, the design and operational characteristics of the reference plants (Korean Standard Nuclear Plant and Korean Next Generation Reactor)were analyzed in order to draw major components, systems, and functions to be satisfied or simulated in the test facility. The test matrix is set up by considering major safety concerns of interest and the test objectives to confirm and enhance the safety of the plants. And the analysis and prioritization of the test matrix leads to the general design requirements of the test facility. Based on the general design requirements, the design criteria is set up for the basic and detailed design of the test facility. And finally it is drawn the design requirements specific to the fluid system and measurement system of the test facility. The test requirements in this report will be used as a guideline to the scaling analysis and basic design of the test facility. The test matrix specified in this report can be modified in the stage of main testing by considering the needs of experiments and circumstances at that time

  5. 1.8kW laser diode pumped YAG laser; Shutsuryoku 1.8kW no handotai laser reiki YAG laser

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Toshiba Corporation, as a participant in Ministry of International Trade and Industry`s `photon measurement and processing technology project` since August, 1997, is engaged in the development of an energy-efficient LD (laser diode) pumped semiconductor YAG (yttrium-aluminum-garnet) laser device to be used for welding and cutting. It is a 5-year project and the goal is a mean output of 10kW and efficiency of 20%. In this article, a simulation program is developed which carries out calculation about element technology items such as the tracking of the beam from the pumping LD and the excitation distribution, temperature distribution, thermal stress distribution, etc., in the YAG rod. An oscillator is constructed, based on the results of the simulation, and it exhibits a world-high class continuous laser performance of a 1.8kW output and 13% efficiency. The record of 13% efficiency is five times higher than that achieved by the conventional lamp-driven YAG laser device. (translated by NEDO)

  6. A 2.5-kW industrial CO2 laser

    Science.gov (United States)

    Golov, V. K.; Ivanchenko, A. I.; Krasheninnikov, V. V.; Ponomarenko, A. G.; Shepelenko, A. A.

    1986-06-01

    A fast-flow laser is reported in which the active medium is excited by a self-sustained dc discharge produced by an electric-discharge device with nonsectioned electrodes. In the laser, two discharge gaps are formed by a flat anode and two cathodes, one on each side of the anode. A gas mixture is driven through the gasdynamic channel by a centrifugal fan rotating at 6000 rpm/min. With a mixture of CO2:N2:He = 2.5:7.5:5 mm Hg, the rated power is 2.5 kW; the maximum power is 4 kW with the mixture 2.5:7.5:10 mm Hg. The general design of the laser is described, and its principal performance characteristics are given.

  7. 105KE and 105KW Basins fuel and sludge consolidation study, summary report

    International Nuclear Information System (INIS)

    Gant, R.G.

    1994-01-01

    This study is a summary report that examines and evaluates the feasibility of consolidating irradiated fuel and sludge currently in KE Basin with that in the KW Basin. This study was conducted in support of TPA Milestone (target date) M-34-00-T03. The report summarizes three supporting engineering studies involving: (1) spent fuel consolidation into the single basin, (2) transport of the encapsulated fuel between KE and KW Basins, and (3) dispositioning contaminated water remaining in KE Basin. From the three reports, and preferred storage method, transfer method and water disposition method were defined. These consolidation methods were then evaluated against the no action alternative of continued storage using both KE and KW Basins. The report concluded that the fuel and sludge currently stored in KE Basin not be consolidated in the KW Basin, primarily due to increased cost and radiation exposure required to consolidate the fuel and sludge. Consolidation is more attractive for storage periods beyond the year 2002, which is the study period of the report

  8. SWGELLA DYSENTERIAE TYPE 1 IN KwAZuLU-NATAL

    African Journals Online (AJOL)

    -control. 1995: 15. ure co. LABORATORY SURV~ILLAN.CEOF. SWGELLA DYSENTERIAE TYPE 1 IN. KwAZuLU- ... freeze-dried quality-eontrol specimens were prepared containing ... (National Committee for Clinical Laboratory Standards,.

  9. Project proposals on the creation of Russian-American joint enterprise for investigation, development and manufacture of power plants on the basis of solid oxide fuel cells

    Energy Technology Data Exchange (ETDEWEB)

    Smotrov, N.V.; Kleschev, Yu.N.

    1996-04-01

    This paper describes a proposal for a joint Russian-American enterprise for performing scientific investigations, development, and manufacture of fuel cell power plants on the basis of the solid oxide fuel cell. RASOFCo. Russian-American Solid Oxide Fuel Cells Company. RASOFCo will provide the series output of the electrochemical generator (ECG) of 1kW power, then of 5kW and 10kW as well as the development and the output of 10kW power plant with the subsequent output of a power plant of greater power. An ECG based on solid oxide fuel cells uses methane as a fuel. Predicted technical characteristics, market analysis, assessment of potential demands for power plants of low power for Tyumentransgas, participants of the joint enterprise and their founding contributions, strategy for manufacture and financing, and management of RASOFCo are discussed.

  10. 1998 Annual Study Report. Research and development of solid polymer type fuel cells (Development of techniques for power generation systems and several tens kW class, distributed power source systems); 1998 nendo seika hokokusho. Kotai kobunshigata nenryo denchi no kenkyu kaihatsu (hatsuden system gijutsu no kaihatsu / koden'atsugata su 10kW kyu bunsan dengen system no kaihatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The cells are tested using a CO-containing synthetic reforming gas in 1998, to verify the long-term characteristics of the solid polymer type fuel cells. The cells, equipped with the anode catalyst developed therefor, are tested for extended periods, to confirm the performance and stability in the synthetic gas flow. For development of the catalyst, the optimum content of Ru in the Pt and Ru alloy composition is determined. For the cell tests, the single- and 3-cell units are tested for extended periods. For verification of commercial viability of the stacked cell systems, the cell-humidifying techniques are developed, which can uniformly humidify each cell in the stacked unit with a number of cells, after investigating the effects of temporal changes in water permeability, pretreatment conditions and film thickness. These techniques are used to develop and operate a 10kW, stacked cell unit, which successfully generates power of 10.6 kW at the rated current density, exceeding the target of 10 kW. For development of design bases for compact fuel treatment system, the techniques which allow reduction of CO concentration to 10 ppm or less at high repeatability are developed. (NEDO)

  11. 1998 Annual Study Report. Research and development of solid polymer type fuel cells (Development of techniques for power generation systems and several tens kW class, distributed power source systems); 1998 nendo seika hokokusho. Kotai kobunshigata nenryo denchi no kenkyu kaihatsu (hatsuden system gijutsu no kaihatsu / koden'atsugata su 10kW kyu bunsan dengen system no kaihatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The cells are tested using a CO-containing synthetic reforming gas in 1998, to verify the long-term characteristics of the solid polymer type fuel cells. The cells, equipped with the anode catalyst developed therefor, are tested for extended periods, to confirm the performance and stability in the synthetic gas flow. For development of the catalyst, the optimum content of Ru in the Pt and Ru alloy composition is determined. For the cell tests, the single- and 3-cell units are tested for extended periods. For verification of commercial viability of the stacked cell systems, the cell-humidifying techniques are developed, which can uniformly humidify each cell in the stacked unit with a number of cells, after investigating the effects of temporal changes in water permeability, pretreatment conditions and film thickness. These techniques are used to develop and operate a 10kW, stacked cell unit, which successfully generates power of 10.6 kW at the rated current density, exceeding the target of 10 kW. For development of design bases for compact fuel treatment system, the techniques which allow reduction of CO concentration to 10 ppm or less at high repeatability are developed. (NEDO)

  12. THE EFFICACY OF THE CABLES OF 6–110 KW WITH XLPE INSULATION. Part 2

    Directory of Open Access Journals (Sweden)

    M. A. Korotkevich

    2017-01-01

    Full Text Available The assessment of the suitability of cables of 6–110 kW with XLPE insulation in comparison with cables of the same voltage but possessing paper-oil insulation has been fulfilled on the basis of the method of multi-objective optimization that makes it possible to account not only the quantitative characteristics (of reduced costs, but also qualitative ones. As an indicator of the reliability of the cable line the maximum mean time to failure (the value inversely proportional to the parameter of succession of failures, which is an order more for cable lines with XLPE insulation than for cable lines with paper insulation, is adopted. A comprehensive assessment of the convenience of installation of cable lines revealed that the installation of cable with XLPE insulation features a 1.2–1.6 times easier installation as compared to three-wire (voltage 10 kW and 1.4 times easier installation as compared to single-core oil-filled cables (voltage of 110 kW. The efficacy of the cables 6–110 kW with XLPE insulation is proved on the basis on the method of multi-objective optimization, that took into account as the costs for the construction and operation of cable lines and the reliability of its operation, ease of its installation and other quality indicators. If the goals taken into account are considered as equally important, the polyethylene-insulated cables for a voltage of 10–110 kW is more efficient as compared to three-wire (voltage 10 kW and solid (110 kW cables with paper insulation. Herewith, the cost of the cable with XLPE insulation may exceed the cost of cable with paper insulation up to two times. If the most important aim is to provide the minimum reduced costs for the construction and operation of the cable line, the use of cables with XLPE insulation for voltage of 10 kW is most advisable in individual cases.

  13. Design of 28 GHz, 200 kW Gyrotron for ECRH Applications

    Science.gov (United States)

    Yadav, Vivek; Singh, Udaybir; Kumar, Nitin; Kumar, Anil; Deorani, S. C.; Sinha, A. K.

    2013-01-01

    This paper presents the design of 28 GHz, 200 kW gyrotron for Indian TOKAMAK system. The paper reports the designs of interaction cavity, magnetron injection gun and RF window. EGUN code is used for the optimization of electron gun parameters. TE03 mode is selected as the operating mode by using the in-house developed code GCOMS. The simulation and optimization of the cavity parameters are carried out by using the Particle-in-cell, three dimensional (3-D)-electromagnetic simulation code MAGIC. The output power more than 250 kW is achieved.

  14. Cooling system upgrading from 250 kW to 1 MW

    International Nuclear Information System (INIS)

    Anderson, T.V.; Johnson, A.G.; Ringle, J.C.

    1972-01-01

    The Oregon State TRIGA reactor (OSTR) power capability was upgraded from 250 KW to 1 MW in 1969; however, funds were not available for simultaneous upgrading of the cooling system. Since then, the OSTR has been selectively operating at full power with the original 250 KW cooling system. After funds were made available in 1971 the construction on the new heat exchanger building began. The new cooling system was installed, equipment was checked out, corrections were made, and acceptance tests were run. In addition, several days were required to clean up the primary system water, since increased water flow (350 gpm) swirled 4 year's collection of sediment off the reactor tank bottom and into the primary system. Three interesting items have been noticed, which are apparently a result of the cooling system upgrading: (1) the radiation levels above the reactor tank have been reduced by a factor of 2 to 3, (2) a low resonance vibration in the reactor core occurs at 1 MW. The vibration is attributed to a combination of increased water turbulence and subcooled (surface) nucleate boiling, and (3) direct radiation levels from the demineralizer tank have increased approximately 8-fold. This resulted in a relocation of the tank and the use of supplemental shielding. Increased operating time at higher average power levels, plus disturbance of; sediment on the bottom of the reactor tank are believed to be the main sources of the higher radiation levels

  15. Power requirements of biogas upgrading by water scrubbing and biomethane compression: Comparative analysis of various plant configurations

    International Nuclear Information System (INIS)

    Budzianowski, Wojciech M.; Wylock, Christophe E.; Marciniak, Przemysław A.

    2017-01-01

    Highlights: • Insights into power requirements of biomethane production from biogas are provided. • Process model is constructed, validated and simulated. • High-pressure and low-pressure plant operation in different configurations is compared. - Abstract: Biogas upgrading by water scrubbing followed by biomethane compression is an environmentally benign process. It may be achieved using various plant configurations characterised by various power requirements with associated effects on biomethane sustainability. Therefore, the current study has been undertaken to systematically investigate the power requirements of a range of water scrubbing options. Two groups of water scrubbing are analysed: (1) high pressure water scrubbing (HPWS) and (2) near-atmospheric pressure water scrubbing (NAPWS). A water scrubbing plant model is constructed, experimentally validated and simulated for seven upgrading plant configurations. Simulation results show that the power requirement of biogas upgrading in HPWS plants is mainly associated with biogas compression. In contrast, in NAPWS plants the main power is required for water pumping. In both plants the compression of the biomethane from atmosphereic pressure to 20 MPa also contributes remarkably. It is observed that the lowest specific power requirement can be obtained for a NAPWS plant without water regeneration (0.24 kW h/Nm"3 raw biogas) but this plant requires cheap water supply, e.g. outlet water from a sewage treatment plant or river. The second is HPWS without flash (0.29 kW h/Nm"3 raw biogas). All other HPWS with flash and NAPWS with water regeneration plants have specific power requirements between 0.30 and 0.33 kW h/Nm"3 raw biogas. Biogas compression without upgrading requires about 0.29 kW h/Nm"3 raw biogas. The thermodynamic efficiency of biogas upgrading is between 2.2% and 9.8% depending on the plant configuration while biomethane compression efficiency is higher, about 55%. This result implies that the

  16. Combined Heat and Power Systems Technology Development and Demonstration 370 kW High Efficiency Microturbine

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2015-10-14

    The C370 Program was awarded in October 2010 with the ambitious goal of designing and testing the most electrically efficient recuperated microturbine engine at a rated power of less than 500 kW. The aggressive targets for electrical efficiency, emission regulatory compliance, and the estimated price point make the system state-of-the-art for microturbine engine systems. These goals will be met by designing a two stage microturbine engine identified as the low pressure spool and high pressure spool that are based on derivative hardware of Capstone’s current commercially available engines. The development and testing of the engine occurred in two phases. Phase I focused on developing a higher power and more efficient engine, that would become the low pressure spool which is based on Capstone’s C200 (200kW) engine architecture. Phase II integrated the low pressure spool created in Phase I with the high pressure spool, which is based on Capstone’s C65 (65 kW) commercially available engine. Integration of the engines, based on preliminary research, would allow the dual spool engine to provide electrical power in excess of 370 kW, with electrical efficiency approaching 42%. If both of these targets were met coupled with the overall CHP target of 85% total combined heating and electrical efficiency California Air Resources Board (CARB) level emissions, and a price target of $600 per kW, the system would represent a step change in the currently available commercial generation technology. Phase I of the C370 program required the development of the C370 low pressure spool. The goal was to increase the C200 engine power by a minimum of 25% — 250 kW — and efficiency from 32% to 37%. These increases in the C200 engine output were imperative to meet the power requirements of the engine when both spools were integrated. An additional benefit of designing and testing the C370 low pressure spool was the possibility of developing a stand-alone product for possible

  17. Development of high average power industrial Nd:YAG laser with peak power of 10 kW class

    International Nuclear Information System (INIS)

    Kim, Cheol Jung; Kim, Jeong Mook; Jung, Chin Mann; Kim, Soo Sung; Kim, Kwang Suk; Kim, Min Suk; Cho, Jae Wan; Kim, Duk Hyun

    1992-03-01

    We developed and commercialized an industrial pulsed Nd:YAG laser with peak power of 10 kW class for fine cutting and drilling applications. Several commercial models have been investigated in design and performance. We improved its quality to the level of commercial Nd:YAG laser by an endurance test for each parts of laser system. The maximum peak power and average power of our laser were 10 kW and 250 W, respectively. Moreover, the laser pulse width could be controlled from 0.5 msec to 20 msec continuously. Many optical parts were localized and lowered much in cost. Only few parts were imported and almost 90% in cost were localized. Also, to accellerate the commercialization by the joint company, the training and transfer of technology were pursued in the joint participation in design and assembly by company researchers from the early stage. Three Nd:YAG lasers have been assembled and will be tested in industrial manufacturing process to prove the capability of developed Nd:YAG laser with potential users. (Author)

  18. Engineering study: 105KE to 105KW Basin fuel and sludge transfer. Final report

    International Nuclear Information System (INIS)

    Gant, R.G.

    1994-01-01

    In the last five years, there have been three periods at the 105KE fuel storage basin (KE Basin) where the reported drawdown test rates were in excess of 25 gph. Drawdown rates in excess of this amount have been used during past operations as the primary indicators of leaks in the basin. The latest leak occurred in March, 1993. The reported water loss from the KE Basin was estimated at 25 gph. This engineering study was performed to identify and recommend the most feasible and practical method of transferring canisters of irradiated fuel and basin sludge from the KE Basin to the 105KW fuel storage basin (KW Basin). Six alternatives were identified during the performance of this study as possible methods for transferring the fuel and sludge from the KE Basin to the KW Basin. These methods were then assessed with regard to operations, safety, radiation exposure, packaging, environmental concerns, waste management, cost, and schedule; and the most feasible and practical methods of transfer were identified. The methods examined in detail in this study were based on shipment without cooling water except where noted: Transfer by rail using the previously used transfer system and water cooling; Transfer by rail using the previously used transfer system (without water cooling); Transfer by truck using the K Area fuel transfer cask (K Area cask); Transfer by truck using a DOE shipping cask; Transfer by truck using a commercial shipping cask; and Transfer by truck using a new fuel shipping cask

  19. Dynamical Investigation of Asteroid 66391 (1999 KW4)

    Science.gov (United States)

    Scheeres, Daniel J.; Fahnestock, E. G.; Ostro, S. J.; Margot, J. L.; Benner, L. A.; Broschart, S. B.; Bellerose, J.; Giorgini, J. D.; Nolan, M. C.; Magri, C.; Pravec, P.; Scheirich, P.; Rose, R.; Jurgens, R. F.; Suzuki, S.; DeJong, E. M.

    2006-09-01

    Radar imaging and simulation of the binary near-Earth asteroid 66391 (1999 KW4) reveals a system with highly unusual physical and dynamical properties (Ostro et al., DPS 2006). Classical treatments and previous analyses of binary-system dynamics have made assumptions about the component shapes that are not valid for the KW4 system. We have explored the full dynamics of the KW4 system via numerical simulations that solve the equations of motion for the coupled evolution of orbit and rotation, using radar-derived physical models, and using dynamical constraints from the observations to guide our initial conditions. Our simulations model the translational (or orbital) dynamics as the relative motion between the body centers of mass and model the rotational dynamics using the Euler equations and attitude kinematic equations for each body. All the equations are driven by the mutual gravitational potential, which is an explicit function of the relative position and attitude of the two bodies. Propagation of the system's dynamical evolution over time spans of months has been made tractable by using a novel variational integrator that requires only one evaluation per time step but conserves the symplectic properties of the dynamical system, and by implementing the evaluations on a parallel computer, using up to 256 processors. Our simulations use the component shapes, masses, and average orbit as initial conditions for integrations of the components' spins and mutual orbit, taking into consideration the actual gravitational potentials produced by the model shapes and the coupling between the components' motions. Our results reveal this NEA to have extraordinary physical and dynamical properties, which suggest intriguing possibilities for formation and evolution mechanisms.

  20. Fiscal 1996 result reports of the researches under consignment from NEDO. Developments of fuel cell technology, polymer electrolyte fuel cell, fuel cell power generation system technology, and high-voltage type several tens kW class distributed power source system; Shin energy sangyo gijutsu sogo kaihatsu kiko itaku gyomu 1996 nendo seika hokokusho. Nenryo denchi gijutsu kaihatsu, kotai kobunshigata nenryo denchi no kenkyu kaihatsu, hatsuden system gijutsu kaihatsu, koden`atsugata suju kW kyu bunsan dengen system no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This paper precisely reports the research result on development of fuel cell technology in fiscal 1996. On verification of cell durability, the cell test result in hydrogen including CO of 100ppm using Pt-Ru catalyst as CO resistant catalyst showed that the loss percent of cell voltage decreases with an increase in Ru content. On development of stack technology, the carbon humidification plate superior in chemical stability was developed as one of the parts for layered stacks. The separator with a water- permeable carbon plate and serpentine flow fields was fabricated for highly layered stacks, and achieved the target performance in single cell power generation test. On establishment of design basis for compact fuel processor, the bench-scale test was conducted of Ru/{gamma}-Al2O3 and Pt-Ru/{gamma}-Al2O3 catalysts as advanced CO selective oxidation catalyst for CO reducers. On demonstration test for the several tens kW class stationary power plant, the system configuration of power generation plants using natural gas as fuel was studied. 106 figs., 38 tabs.

  1. Marine biomass power plant using methane fermentation

    Energy Technology Data Exchange (ETDEWEB)

    Matsui, T.; Saito, H.; Amano, T.; Sugawara, H.; Seki, T.; Abe, T. [Technology Research Inst., Tokyo Gas Co. Ltd., Tokyo (Japan)

    2004-07-01

    This study presented an effective way to produce biogas from the large quantities of seaweed waste in Japan. A large-scale marine biomass pilot plant was built to produce biogas from marine biomass. Methane fermentation was the process used to produce biogas from Laminaria sp. The maximum treating capacity of the pilot plant is 1 ton of seaweed per day. The pilot plant includes a pretreatment facility, fermentation, biogas storage and power generation. The maximum methane yield from the biomass plant is 22 cubic ton-seaweed. The purified biogas has generated 10 kW of electricity and 23 kW of heat. The biogas was also mixed with natural gas for use in a gas engine generator. The engine operation remained stable despite changes in quantity and composition of the collected biogas caused by changes with the source of biomass and sea conditions. The thermal efficiency of the gas engine running on mixed biogas and natural gas was more than 10 per cent higher than an engine running on biogas fuel alone. 4 refs., 2 tabs., 3 figs.

  2. Towards Multi Fuel SOFC Plant

    DEFF Research Database (Denmark)

    Rokni, Masoud; Clausen, Lasse Røngaard; Bang-Møller, Christian

    2011-01-01

    Complete Solid Oxide Fuel Cell (SOFC) plants fed by several different fuels are suggested and analyzed. The plants sizes are about 10 kW which is suitable for single family house with needs for both electricity and heat. Alternative fuels such as, methanol, DME (Di-Methyl Ether) and ethanol...... are also considered and the results will be compared with the base plant fed by Natural Gas (NG). A single plant design will be suggested that can be fed with methanol, DME and ethanol whenever these fuels are available. It will be shown that the plant fed by ethanol will have slightly higher electrical...

  3. 5 kW bidirectional grid-connected drive using silicon-carbide switches: Control

    DEFF Research Database (Denmark)

    Kouchaki, Alireza; Lazar, Radu; Pedersen, Jacob Lykke

    2017-01-01

    his paper presents a controller design for a fully silicon-carbide (SiC) based bidirectional three-phase grid-connected PWM drive. For drive applications, controller must be robust and fast to be able to provide power flow in both directions. In this paper, proportional resonance (PR) current con...... magnet motor. Different tests will be conducted to evaluate the performance of the controllers in both generative and regenerative mode. It is shown that the controller can provide a good dynamic response to load changes for both direction of power flow.......-phase rectifier with switching frequency of 45 kHz will be tested. The test is done by connecting it to a grid simulator and the load is a resistive load. In the second test the rectifier will be connected to the grid via an auto-transformer and load is a 7.5kW SiC based drive which is connected to a permanent...

  4. Management Of Hanford KW Basin Knockout Pot Sludge As Spent Nuclear Fuel

    International Nuclear Information System (INIS)

    Raymond, R. E.; Evans, K. M.

    2012-01-01

    CH2M Hill Plateau Remediation Company (CHPRC) and AREVA Federal Services, LLC (AFS) have been working collaboratively to develop and deploy technologies to remove, transport, and interim store remote-handled sludge from the 10S-K West Reactor Fuel Storage Basin on the U.S. Department of Energy (DOE) Hanford Site near Richland, WA, USA. Two disposal paths exist for the different types of sludge found in the K West (KW) Basin. One path is to be managed as Spent Nuclear Fuel (SNF) with eventual disposal at an SNF at a yet to be licensed repository. The second path will be disposed as remote-handled transuranic (RH-TRU) waste at the Waste Isolation Pilot Plant (WIPP) in Carlsbad, NM. This paper describes the systems developed and executed by the Knockout Pot (KOP) Disposition Subproject for processing and interim storage of the sludge managed as SNF, (i.e., KOP material)

  5. PLC based development of control, monitoring and interlock for 100 kW, 45.6 MHz ICRH system

    International Nuclear Information System (INIS)

    Jadav, Hiralal; Joshi, Rameshkumar; Mali, Aniruddh K.; Kadia; Bhavesh; Parmar; Maganbhai, Kiritkumar; Kulkarni, S.V.

    2015-01-01

    This paper presents details of PLC based system development for 100KW at the rate 45.6 MHz. Presently in ICRH RF DAC (Data acquisition and control) system existing based on real time VME and linux operating system. The ICRH system consists of 1.5 MW RF generator operating at 22- 40MHz which is used for second harmonic heating and pre-ionization experiments on SST-1 Tokamak at 1.5T and 3T magnetic field operation respectively. The task of PLC system in RF ICRH is to control, monitoring and interlocks HVDC power supply signal. Voltage and current signal of 2 kW, 20 kW, tetrode for 100 kW RF tube electrode like Filament, Control grid, Plate, Screen grid, signal monitor and voltage set raised by PLC analog IO module. Acknowledgement of the HVDC supply Filament, Control grid, Plate, Screen grid power supply is monitor and interlocks by PLC Digital IO module to interlocks stop the RF pulse and off HV power supply. The RF pulse(shot) to trigger signal generator (5mw) RF power output feed to LPA then chain of 2 KW, 20 KW, 100 KW at the rate 45.6 MHz. The programming logic controller (PLC) software is written in ladder language for AH500 Delta make using ISP Soft 2.04 and GUI is in the table form to control and monitor the parameters. Communication of PLC to PC by ethernet LAN network. (author)

  6. Design and construction of a 500 KW CW, 400 MHz klystron to be used as RF power source for LHC/RF component tests

    CERN Document Server

    Frischholz, Hans; Pearson, C

    1998-01-01

    A 500 kW cw klystron operating at 400 MHz was developed and constructed jointly by CERN and SLAC for use as a high-power source at CERN for testing LHC/RF components such as circulators, RF absorbers and superconducting cavities with their input couplers. The design is a modification of the 353 MHz SLAC PEP-I klystron. More than 80% of the original PEP-I tube parts could thus be incorporated in the LHC test klystron which resulted in lower engineering costs as well as reduced development and construction time. The physical length between cathode plane and upper pole plate was kept unchanged so that a PEP-I tube focusing solenoid, available at CERN, could be re-used. With the aid of the klystron simulation codes JPNDISK and CONDOR, the design of the LHC tube was accomplished, which resulted in a tube with noticeably higher efficiency than its predecessor, the PEP-I klystron. The integrated cavities were redesigned using SUPERFISH and the output coupling circuit, which also required redesigning, was done with t...

  7. Experimental development, 1D CFD simulation and energetic analysis of a 15 kw micro-CHP unit based on reciprocating internal combustion engine

    International Nuclear Information System (INIS)

    Muccillo, M.; Gimelli, A.

    2014-01-01

    Cogeneration is commonly recognized as one of the most effective solutions to achieve the increasingly stringent reduction in primary energy consumption and greenhouse emissions. This characteristic led to the adoption of specific directives promoting this technique. In addition, a strategic role in power reliability is recognized to distributed generation. The study and prototyping of cogeneration plants, therefore, has involved many research centres. This paper deals with energetic aspects of CHP referring to the study of a 15 kW micro-CHP plant based on a LPG reciprocating engine designed, built and grid connected. The plant consists of a heat recovery system characterized by a single water circuit recovering heat from exhaust gases, from engine coolant and from the energy radiated by the engine within the shell hosting the plant. Some tests were carried out at whole open throttle and the experimental data were collected. However it was needed to perform a 1D thermo-fluid dynamics simulation of the engine to completely characterize the micro-CHP. As the heat actually recovered depends on the user's thermal load, particularly from the required temperature's level, a comparison of the results for six types of users were performed: residential, hospital, office, commercial, sports, hotel. Both Italian legislative indexes IRE and LT were evaluated, as defined by A.E.E.G resolution n. 42/02 and subsequent updates, as well as the plant's total Primary Energy Saving. - Highlights: • This paper deals with energetic aspects of CHP referring to the study of a 15 kW micro-CHP plant. • The 15 kW micro-CHP plant is based on a GPL reciprocating engine designed, built and grid connected. • Some tests were carried out at whole open throttle and the experimental data were collected. • It was needed to perform a 1D thermo-fluid dynamics simulation of the engine to completely characterize the micro-CHP. • The analysed solution is particularly suited for

  8. Improvements to a uranium solidification process by in-plant testing

    International Nuclear Information System (INIS)

    Rindfleisch, J.A.

    1984-01-01

    When a process is having operational or equipment problems, often there is not enough time or money available for an extensive pilot plant program. This is when in-plant testing becomes imperative. One such process at the Idaho Chemical Processing Plant (ICPP) to undergo such an in-plant testing program was the uranium product solidification (denitrator) system. The testing program took approximately six months of in-plant testing that would have required at least two years of pilot plant preparation and operation to obtain the same information. This paper describes the results of the testing program, and the equipment and procedural changes

  9. On-site tests on the nuclear power plants

    International Nuclear Information System (INIS)

    Morilhat, P.; Favennec, J.M.; Neau, P.; Preudhomme, E.

    1996-01-01

    On-site tests and experiments are performed by EDF Research and Development Division on the nuclear power plants to assess the behaviour of major components submitted to thermal and vibratory solicitations. On-going studies deal with the qualification of new nuclear power plant standard and with the feedback of plants under operation. The tests, particularly the investigation tests, correspond to large investments and entail an important data volume which must ensure the continuity over a long period of the order of magnitude of the in-service plant life (around 40 years). This paper addresses the on-site experimental activities, describes the means to be used, and gives an example: the qualification of SG of new 1450 MW nuclear power plants. (author)

  10. Experimental results and thermodynamic analysis of a natural gas small scale cogeneration plant for power and refrigeration purposes

    International Nuclear Information System (INIS)

    Bazzo, Edson; Nacif de Carvalho, Alvaro; Matelli, José Alexandre

    2013-01-01

    In this work, experimental results are reported for a small scale cogeneration plant for power and refrigeration purposes. The plant includes a natural gas microturbine and an ammonia/water absorption chiller fired by steam. The system was tested under different turbine loads, steam pressures and chiller outlet temperatures. An evaluation based on the 1st and 2nd Laws of Thermodynamics was also performed. For the ambient temperature around 24 °C and microturbine at full load, the plant is able to provide 19 kW of saturated steam at 5.3 bar (161 °C), corresponding to 9.2 kW of refrigeration at −5 °C (COP = 0.44). From a 2nd law point-of-view, it was found that there is an optimal chiller outlet temperature that maximizes the chiller exergetic efficiency. As expected, the microturbine presented the highest irreversibilities, followed by the absorption chiller and the HRSG. In order to reduce the plant exergy destruction, it is recommended a new design for the HRSG and a new insulation for the exhaust pipe. -- Highlights: • A small scale cogeneration plant for power and refrigeration is proposed and analyzed. • The plant is based on a microturbine and a modified absorption chiller. • The plant is analysed based on 1st and 2nd laws of thermodynamics. • Experimental results are found for different power and refrigeration conditions. • The plant proved to be technically feasible

  11. The Low Temperature CFB Gasifier

    DEFF Research Database (Denmark)

    Stoholm, P.; Nielsen, Rasmus Glar; Richardt, K.

    2004-01-01

    straw, animal manure and waste and for co-firing the product gas in existing, e.g. coal fired power plant boilers. The aim is to prevent fouling, agglomeration and high temperature corrosion caused by potassium and chlorine and other fuel components when producing electricity. So far 92 hours......The Low Temperature Circulating Fluidised Bed (LT-CFB) gasification process is described together with the 50 kW and the 500 kW test plants and latest test results. The LT-CFB process is especially developed for medium and large scale (few to >100 MW) gasification of problematic bio-fuels like...... of experiments with the 50 kW test plant with two extremely difficult types of straw has shown low char losses and high retentions of ash including e.g. potassium. Latest 27 hours of experiments with dried, high ash pig- and hen manure has further indicated the concepts high fuel flexibility. The new 500 kW test...

  12. Root hydraulic vulnerability regulation of whole-plant conductance along hillslope gradients within subalpine and montane forests

    Science.gov (United States)

    Beverly, D.; Speckman, H. N.; Ewers, B. E.

    2017-12-01

    Ecosystem-scale models often rely on root vulnerability or whole-plant conductance for simulating seasonal evapotranspiration declines via constraints of water uptake and vegetation mortality. Further, many of these ecosystem models rely on single, unvarying, hydraulic parameter estimates for modeling large areas. Ring-porous species have shown seasonal variability in root vulnerability (percent loss of conductivity; PLC) and whole-plant conductance (Kw) but simulations of coniferous forest typically rely on point measurements. This assumption for coniferous forest is not likely true because of seasonal variability caused by phenology and environmental stresses and the potential for cavitation fatigue is not considered. Moreover, many of these dynamics have only been considered for stems even though roots are often the most vulnerable segments of the pathway for conifers. We hypothesized that seasonally dynamic whole-plant conductance along hillslope gradients in coniferous forests are regulated by cavitation fatigue within the roots resulting in seasonal increases in vulnerability. To test the hypothesis, a subalpine mixed forest (3000 m.a.s.l) and montane forest (2550 m.a.s.l.) were monitored between 2015-2017 to quantify PLC and Kw along the hillslope gradients of 300 m and 50 m, respectively. Forest plots were instrumented with 35 Granier-type sapflow sensors. Seasonal sampling campaigns occurred to quantify PLC through centrifuge techniques and Kw through Darcy's law approximations with pre-dawn and diurnal leaf water potentials. Downslope roots exhibit a 33% decrease in maximal conductivity corresponding to the approximately 50% decrease in whole-plant conductance suggesting seasonal soil dry-down limitations within the downslope stands. Upslope stands had no to little change in root vulnerability or decrease in whole-plant conductance as soil water limitations occur immediately following snowmelt, thus limiting hydraulic conductance throughout the growing

  13. French nuclear plant safeguard pump qualification testing: EPEC test loop

    International Nuclear Information System (INIS)

    Guesnon, H.

    1985-01-01

    This paper reviews the specifications to which nuclear power plant safeguard pumps must be qualified, and surveys the qualification methods and program used in France to verify operability of the pump assembly and major pump components. The EPEC test loop is described along with loop capabilities and acheivements up to now. This paper shows, through an example, the Medium Pressure Safety Injection Pump designed for service in 1300 MW nuclear power plants, and the interesting possibilities offered by qualification testing

  14. 100KE/KW fuel storage basin surface volumetric factors

    International Nuclear Information System (INIS)

    Conn, K.R.

    1996-01-01

    This Supporting Document presents calculations of surface Volumetric factors for the 100KE and 100KW Fuel Storage Basins. These factors relate water level changes to basin loss or additions of water, or the equivalent water displacement volumes of objects added to or removed from the basin

  15. Fault location repair, rewinding and commissioning of 3.3 kV, 850 kW synchronous motor (Paper No. 5.9)

    International Nuclear Information System (INIS)

    Subramanian, A.R.; Palani, R.A.A.

    1992-01-01

    The 20K41 compressor in Heavy Water Plant, Tuticorin is compressing medium pressure synthesis gas to high pressure. The compressor is driven by synchronous motor of capacity 850 kW at 3.3 kV. The synchronous motor had been selected for operating a reciprocating compressor because of the compressor's low speed, higher capacity, vibration level etc. Partially it helps for power factor improvement and constant compression of the gas. This paper describes the details of the motor, stator and rotor, method of repair and rewinding of synchronous motor. (author)

  16. Final report on 9 kW Stirling Engine for biogas and natural gas

    DEFF Research Database (Denmark)

    Carlsen, Henrik; Bovin, Jonas Kabell

    2001-01-01

    The need for a simple and robust engine for natural gas and low quality gas has resulted in the design of a single cylinder, hermetic Stirling engine, which has an electric power output of 9 kW. Two engines have been built. One engine is intended for natural gas as fuel and the other is intended...... eliminates guiding forces on the pistons and the need for X-heads. Grease lubricated needle and ball bearings are used in the kinematic crank mechanism in order to avoid oil penetrating into the cylinder volumes. Working gas is Helium at 8 MPa mean pressure. The engine produce up to 11 kW of shaft power...... corresponding to approximately 10 kW of electric power. The design target was an efficiency of 26 % based on lower heat content of the gas to electricity, but only 24% were obtained. The decrease of efficiency is caused by inhomogeneous capacity flows in the air preheater and insufficient insulation...

  17. 30-kW SEP Spacecraft as Secondary Payloads for Low-Cost Deep Space Science Missions

    Science.gov (United States)

    Brophy, John R.; Larson, Tim

    2013-01-01

    The Solar Array System contracts awarded by NASA's Space Technology Mission Directorate are developing solar arrays in the 30 kW to 50 kW power range (beginning of life at 1 AU) that have significantly higher specific powers (W/kg) and much smaller stowed volumes than conventional rigid-panel arrays. The successful development of these solar array technologies has the potential to enable new types of solar electric propulsion (SEP) vehicles and missions. This paper describes a 30-kW electric propulsion vehicle built into an EELV Secondary Payload Adapter (ESPA) ring. The system uses an ESPA ring as the primary structure and packages two 15-kW Megaflex solar array wings, two 14-kW Hall thrusters, a hydrazine Reaction Control Subsystem (RCS), 220 kg of xenon, 26 kg of hydrazine, and an avionics module that contains all of the rest of the spacecraft bus functions and the instrument suite. Direct-drive is used to maximize the propulsion subsystem efficiency and minimize the resulting waste heat and required radiator area. This is critical for packaging a high-power spacecraft into a very small volume. The fully-margined system dry mass would be approximately 1120 kg. This is not a small dry mass for a Discovery-class spacecraft, for example, the Dawn spacecraft dry mass was only about 750 kg. But the Dawn electric propulsion subsystem could process a maximum input power of 2.5 kW, and this spacecraft would process 28 kW, an increase of more than a factor of ten. With direct-drive the specific impulse would be limited to about 2,000 s assuming a nominal solar array output voltage of 300 V. The resulting spacecraft would have a beginning of life acceleration that is more than an order of magnitude greater than the Dawn spacecraft. Since the spacecraft would be built into an ESPA ring it could be launched as a secondary payload to a geosynchronous transfer orbit significantly reducing the launch costs for a planetary spacecraft. The SEP system would perform the escape

  18. Technical and environmental performance of 10 kW understocker boiler during combustion of biomass and conventional fuels

    OpenAIRE

    Junga Robert; Wzorek Małgorzata; Kaszubska Mirosława

    2017-01-01

    This paper treats about the impact fuels from biomass wastes and coal combustion on a small boiler operation and the emission of pollutants in this process. Tests were performed in laboratory conditions on a water boiler with retort furnace and the capacity of 10 kW. Fuels from sewage sludge and agriculture wastes (PBZ fuel) and a blend of coal with laying hens mature (CLHM) were taken into account. The results in emission changes of NOx, CO2, CO and SO2 and operating parameters of the tested...

  19. Low-power wind plants

    International Nuclear Information System (INIS)

    Kovalenko, V.I.; Shevchenko, Yu.V.; Shikhajlov, N.A.; Kokhanevich, V.P.; Tanan, G.L.

    1993-01-01

    Design peculiarities, as well as the prospects of development and introduction of the low-power (from 0.5 up to 4 kW) wind power plants (WPP) are considered. The variants of WPP with vertical and horizontal rotation axis are described. The data characterizing cost and structure of expenditures on WPP manufacture and operation are given

  20. Experimentation with a reverse osmosis plant powered by renewable energies

    Energy Technology Data Exchange (ETDEWEB)

    Segura, L.; Gomez, A. [Las Palmas de Gran Canaria Univ., Las Palmas (Spain). Dept. of Process Engineering; Nuez, I. [Las Palmas de Gran Canaria Univ., Las Palmas (Spain). Dept. of Electronic and Automatic Engineering

    2006-07-01

    This paper described a set of tests conducted in a reverse osmosis plant powered by renewable energy sources. Variations on feed flow, reject flow, recovery and power consumption were investigated. The plant has a production of over 115 m{sup 3} per day. During the experiments, the plant was required to operate at variable loading conditions. An energy recovery system was then developed to operate effectively with the observed variable load conditions. The system was incorporated within the reject flow system and was comprised of a Pelton turbine matched to the axis of an asynchronous energy generator. The system was designed to avoid making changes to the actual hydraulic circuit of the plant. Recovery system failures did not necessitate plant stoppages during the testing period. Simulations conducted to assess the energy system showed that optimal performance of the plant was between 16 and 18 kW with a working pressure of between 57 to 67 bars. Results also suggested that installing the system in the evacuation brine line would maximize the use of kinetic energy. It was concluded that energy recovery systems are ideal for use in seawater installations where functioning pressure levels are high. 14 refs., 1 tab., 5 figs.

  1. A 50-kW Module Power Station of Directly Solar-Pumped Iodine Laser

    Science.gov (United States)

    Choi, S. H.; Lee, J. H.; Meador, W. E.; Conway, E. J.

    1997-01-01

    The conceptual design of a 50 kW Directly Solar-Pumped Iodine Laser (DSPIL) module was developed for a space-based power station which transmits its coherent-beam power to users such as the moon, Martian rovers, or other satellites with large (greater than 25 kW) electric power requirements. Integration of multiple modules would provide an amount of power that exceeds the power of a single module by combining and directing the coherent beams to the user's receiver. The model developed for the DSPIL system conservatively predicts the laser output power (50 kW) that appears much less than the laser output (93 kW) obtained from the gain volume ratio extrapolation of experimental data. The difference in laser outputs may be attributed to reflector configurations adopted in both design and experiment. Even though the photon absorption by multiple reflections in experimental cavity setup was more efficient, the maximum secondary absorption amounts to be only 24.7 percent of the primary. However, the gain volume ratio shows 86 percent more power output than theoretical estimation that is roughly 60 percent more than the contribution by the secondary absorption. Such a difference indicates that the theoretical model adopted in the study underestimates the overall performance of the DSPIL. This fact may tolerate more flexible and radical selection of design parameters than used in this design study. The design achieves an overall specific power of approximately 5 W/kg and total mass of 10 metric tons.

  2. 200 kW, 800 MHz transmitter system for lower hybrid heating

    International Nuclear Information System (INIS)

    Deitz, A.

    1975-01-01

    This paper describes a new rf heating system which has just been completed and is now operational on the ATC machine. The system utilizes four UHF TV klystrons to generate at least 200 kW of power at a frequency of 800 MHz. Pulse widths can be varied from 20 μsec up to 20 msec. A radar type floating deck modulator along with photo-optical transmitting and receiving devices have been incorporated into the system to provide the pulse fidelity and versatility which characterizes this equipment. Modular construction was emphasized in the design, when possible, to reduce maintenance and down time in the advent of component falilure. Hybrid combining techniques are utilized in order to provide two 100 kW feeds into the machine

  3. 10-MWe pilot-plant-receiver panel test requirements document solar thermal test facility

    Energy Technology Data Exchange (ETDEWEB)

    1978-08-25

    Testing plans for a full-scale test receiver panel and supporting hardware which essentially duplicate both physically and functionally, the design planned for the Barstow Solar Pilot Plant are presented. Testing is to include operation during normal start and shutdown, intermittent cloud conditions, and emergencies to determine the panel's transient and steady state operating characteristics and performance under conditions equal to or exceeding those expected in the pilot plant. The effects of variations of input and output conditions on receiver operation are also to be investigated. Test hardware are described, including the pilot plant receiver, the test receiver assembly, receiver panel, flow control, electrical control and instrumentation, and structural assembly. Requirements for the Solar Thermal Test Facility for the tests are given. The safety of the system is briefly discussed, and procedures are described for assembly, installation, checkout, normal and abnormal operations, maintenance, removal and disposition. Also briefly discussed are quality assurance, contract responsibilities, and test documentation. (LEW)

  4. Gas and liquid sampling for closed canisters in KW Basin - Work Plan

    International Nuclear Information System (INIS)

    Pitkoff, C.C.

    1995-01-01

    Work Plan for the design and fabrication of gas/liquid sampler for closed canister sampling in KW Basin. This document defines the tasks associated with the design, fabrication, assembly, and acceptance testing equipment necessary for gas and liquid sampling of the Mark I and Mark II canisters in the K-West basin. The sampling of the gas space and the remaining liquid inside the closed canisters will be used to help understand any changes to the fuel elements and the canisters. Specifically, this work plan will define the scope of work and required task structure, list the technical requirements, describe design configuration control and verification methodologies, detail quality assurance requirements, and present a baseline estimate and schedule

  5. Characterization and testing of 30 kV, 60 kW electron optical column for melting applications

    Energy Technology Data Exchange (ETDEWEB)

    Baibhaw, Prakash; Gupta, Sachin; Malik, Pravanjan, E-mail: bprakash@barc.gov.in [Bhabha Atomic Research Centre, Mumbai (India)

    2014-07-01

    High energy electron beams (30-150 keV) are widely used as intense heat source in welding, melting and evaporation of refractory metals. These operations are mostly carried out in high vacuum (10{sup -4}-10{sup -5} mbar) to aid unimpeded flow of electrons from generation to the point of application. A 30 kV, 60 kW Electron beam optical column (EOC) is designed and developed under the high power beam technology programme. The optical column consists of an electron gun and twin electromagnetic focusing lenses. The heating power of emitter, gun perveance, grid voltage control, beam focusing with the twin electromagnetic lenses and beam spot size measurements are reported in this paper. The results are compared with the design values. Operational issues during the high power melting and the strategy for automation of the electron gun are discussed. (author)

  6. A 200-kW wind turbine generator conceptual design study

    Science.gov (United States)

    1979-01-01

    A conceptual design study was conducted to define a 200 kW wind turbine power system configuration for remote applications. The goal was to attain an energy cost of 1 to 2 cents per kilowatt-hour at a 14-mph site (mean average wind velocity at an altitude of 30 ft.) The costs of the Clayton, New Mexico, Mod-OA (200-kW) were used to identify the components, subsystems, and other factors that were high in cost and thus candidates for cost reduction. Efforts devoted to developing component and subsystem concepts and ideas resulted in a machine concept that is considerably simpler, lighter in weight, and lower in cost than the present Mod-OA wind turbines. In this report are described the various innovations that contributed to the lower cost and lighter weight design as well as the method used to calculate the cost of energy.

  7. Heat and mass release for some transient fuel source fires: A test report

    International Nuclear Information System (INIS)

    Nowlen, S.P.

    1986-10-01

    Nine fire tests using five different trash fuel source packages were conducted by Sandia National Laboratories. This report presents the findings of these tests. Data reported includes heat and mass release rates, total heat and mass release, plume temperatures, and average fuel heat of combustion. These tests were conducted as a part of the US Nuclear Regulatory Commission sponsored fire safety research program. Data from these tests were intended for use in nuclear power plant probabilistic risk assessment fire analyses. The results were also used as input to a fire test program at Sandia investigating the vulnerability of electrical control cabinets to fire. The fuel packages tested were chosen to be representative of small to moderately sized transient trash fuel sources of the type that would be found in a nuclear power plant. The highest fire intensity encountered during these tests was 145 kW. Plume temperatures did not exceed 820 0 C

  8. Assessment of 25 kW free-piston Stirling technology alternatives for solar applications

    Science.gov (United States)

    Erbeznik, Raymond M.; White, Maurice A.; Penswick, L. B.; Neely, Ronald E.; Ritter, Darren C.; Wallace, David A.

    1992-01-01

    The final design, construction, and testing of a 25-kW free-piston advanced Stirling conversion system (ASCS) are examined. The final design of the free-piston hydraulic ASCS consists of five subsystems: heat transport subsystem (solar receiver and pool boiler), free-piston hydraulic Stirling engine, hydraulic subsystem, cooling subsystem, and electrical and control subsystem. Advantages and disadvantages are identified for each technology alternative. Technology alternatives considered are gas bearings vs flexure bearings, stationary magnet linear alternator vs moving magnetic linear alternator, and seven different control options. Component designs are generated using available in-house procedures to meet the requirements of the free-piston Stirling convertor configurations.

  9. Construction of a 35 GHz 100 kW gyrotron; Construcao de um girotron de 35 GHz e de 100 kW

    Energy Technology Data Exchange (ETDEWEB)

    Aso, Y; Barroso, J J; Castro, P J; Correa, R A; Ludwing, G O; Montes, A; Morgado, U T.F.; Nono, M C.A.; Rossi, J O; Silva, P R

    1989-09-01

    In this work a description of a 35 GHz 100 kW gyrocon is described which is under construction at the National Space Research Institute Plasma Laboratory. Project conceptual aspects are emphasized, specifically high current density thermionic cathodes, high time and spatial resolution intense magnetic fields generation, high-vacuum systems, techniques of ceramic-metal sealing, and high-voltage electrical modulator circuits. (author). 8 refs., 9 figs., 1 tab.

  10. An assessment of KW Basin radionuclide activity when opening SNF canisters

    International Nuclear Information System (INIS)

    Bergmann, D.W.; Mollerus, F.J.; Wray, J.L.

    1995-01-01

    N Reactor spent fuel is being stored in sealed canisters in the KW Basin. Some of the canisters contain damaged fuel elements. There is the potential for release of Cs 137, Kr 85, H3, and other fission products and transuranics (TRUs) when canisters are opened. Canister opening is required to select and transfer fuel elements to the 300 Area for examination as part of the Spent Nuclear Fuel (SNF) Characterization program. This report estimates the amount of radionuclides that can be released from Mark II spent nuclear fuel (SNF) canisters in KW Basin when canisters are opened for SNF fuel sampling as part of the SNF Characterization Program. The report also assesses the dose consequences of the releases and steps that can be taken to reduce the impacts of these releases

  11. Mixing and sampling tests for Radiochemical Plant

    International Nuclear Information System (INIS)

    Ehinger, M.N.; Marfin, H.R.; Hunt, B.

    1999-01-01

    The paper describes results and test procedures used to evaluate uncertainly and basis effects introduced by the sampler systems of a radiochemical plant, and similar parameters associated with mixing. This report will concentrate on experiences at the Barnwell Nuclear Fuels Plant. Mixing and sampling tests can be conducted to establish the statistical parameters for those activities related to overall measurement uncertainties. Density measurements by state-of-the art, commercially availability equipment is the key to conducting those tests. Experience in the U.S. suggests the statistical contribution of mixing and sampling can be controlled to less than 0.01 % and with new equipment and new tests in operating facilities might be controlled to better accuracy [ru

  12. Optimizing Waste Heat Utilization in Vehicle Bio-Methane Plants

    Directory of Open Access Journals (Sweden)

    Feng Zhen

    2018-06-01

    Full Text Available Current vehicle bio-methane plants have drawbacks associated with high energy consumption and low recovery levels of waste heat produced during the gasification process. In this paper, we have optimized the performance of heat exchange networks using pinch analysis and through the introduction of heat pump integration technology. Optimal results for the heat exchange network of a bio-gas system producing 10,000 cubic meters have been calculated using a pinch point temperature of 50 °C, a minimum heating utility load of 234.02 kW and a minimum cooling utility load of 201.25 kW. These optimal parameters are predicted to result in energy savings of 116.08 kW (19.75%, whilst the introduction of new heat pump integration technology would afford further energy savings of 95.55 kW (16.25%. The combined energy saving value of 211.63 kW corresponds to a total energy saving of 36%, with economic analysis revealing that these reforms would give annual savings of 103,300 USD. The installation costs required to introduce these process modifications are predicted to require an initial investment of 423,200 USD, which would take 4.1 years to reach payout time based on predicted annual energy savings.

  13. Thermal simulation for 35 kW powered prototype radio frequency quadrapole

    International Nuclear Information System (INIS)

    Kothari, Ashok; Ahuja, Rajeev; Safvan, C.P.; Kumar, Sugam

    2011-01-01

    thermal simulation is Solidworks Flow Simulation. The distribution of total heat load among different components of the assembly was obtained through CST Microwave Studio software. Thermal simulation of a 35 kW powered Prototype RFQ is described in the paper. The RFQ assembly has been tested upto 18 kW power and comparison of the simulated results is presented in the paper. (author)

  14. High brightness KW-class direct diode laser

    Science.gov (United States)

    Xu, Dan; Guo, Zhijie; Ma, Di; Zhang, Tujia; Guo, Weirong; Wang, Baohua; Xu, Ray; Chen, Xiaohua

    2018-02-01

    With certain emitter beam quality and BPP allowed by fiber, we have derived a spatial beam combination structure that approaches the BPP limit of the fiber. Using the spatial beam combination structure and polarization beam combination, BWT has achieved 1.1KW output from a fiber (one end coated) with NA 0.22 and core diameter of 200μm. The electro- optical efficiency is nearly 47%. Multiple emitters with wavelength of 976nm are packaged in a module with size of 600 ×350×80mm3.

  15. STP-ECRTS - THERMAL AND GAS ANALYSES FOR SLUDGE TRANSPORT AND STORAGE CONTAINER (STSC) STORAGE AT T PLANT

    Energy Technology Data Exchange (ETDEWEB)

    CROWE RD; APTHORPE R; LEE SJ; PLYS MG

    2010-04-29

    The Sludge Treatment Project (STP) is responsible for the disposition of sludge contained in the six engineered containers and Settler tank within the 105-K West (KW) Basin. The STP is retrieving and transferring sludge from the Settler tank into engineered container SCS-CON-230. Then, the STP will retrieve and transfer sludge from the six engineered containers in the KW Basin directly into a Sludge Transport and Storage Containers (STSC) contained in a Sludge Transport System (STS) cask. The STSC/STS cask will be transported to T Plant for interim storage of the STSC. The STS cask will be loaded with an empty STSC and returned to the KW Basin for loading of additional sludge for transportation and interim storage at T Plant. CH2MHILL Plateau Remediation Company (CHPRC) contracted with Fauske & Associates, LLC (FAI) to perform thermal and gas generation analyses for interim storage of STP sludge in the Sludge Transport and Storage Container (STSCs) at T Plant. The sludge types considered are settler sludge and sludge originating from the floor of the KW Basin and stored in containers 210 and 220, which are bounding compositions. The conditions specified by CHPRC for analysis are provided in Section 5. The FAI report (FAI/10-83, Thermal and Gas Analyses for a Sludge Transport and Storage Container (STSC) at T Plant) (refer to Attachment 1) documents the analyses. The process considered was passive, interim storage of sludge in various cells at T Plant. The FATE{trademark} code is used for the calculation. The results are shown in terms of the peak sludge temperature and hydrogen concentrations in the STSC and the T Plant cell. In particular, the concerns addressed were the thermal stability of the sludge and the potential for flammable gas mixtures. This work was performed with preliminary design information and a preliminary software configuration.

  16. Characterization of Settler Tank and KW Container Sludge Simulants

    Energy Technology Data Exchange (ETDEWEB)

    Burns, Carolyn A.; Luna, Maria; Schmidt, Andrew J.

    2009-05-12

    The Sludge Treatment Project (STP), managed by CH2M Hill Plateau Remediation Company (CHPRC) has specified base formulations for non-radioactive sludge simulants for use in the development and testing of equipment for sludge sampling, retrieval, transport, and processing. In general, the simulant formulations are based on the average or design-basis physical and chemical properties obtained by characterizing sludge samples. The simulants include surrogates for uranium metal, uranium oxides (agglomerates and fine particulate), and the predominant chemical phases (iron and aluminum hydroxides, sand). Specific surrogate components were selected to match the nominal particle-size distribution and particle-density data obtained from sludge sample analysis. Under contract to CHPRC, Pacific Northwest National Laboratory (PNNL) has performed physical and rheological characterization of simulants, and the results are reported here. Two base simulant types (dry) were prepared by STP staff at the Maintenance and Storage Facility and received by PNNL on February 12, 2009: Settler Tank Simulant and KW Container Sludge Simulant. The objectives of this simulant characterization effort were to provide baseline characterization data on simulants being used by STP for process development and equipment testing and provide a high-level comparison of the simulant characteristics to the targets used to formulate the simulants.

  17. Participatory innovation process for testing new practices for soil fertility management in Chókwè Irrigation Scheme (Mozambique)

    Science.gov (United States)

    Sánchez Reparaz, Maite; de Vente, Joris; Famba, Sebastiao; Rougier, Jean-Emmanuel; Ãngel Sánchez-Monedero, Miguel; Barberá, Gonzalo G.

    2015-04-01

    Integrated water and nutrient management are key factors to increase productivity and to reduce the yield gap in irrigated systems in Sub-Saharan Africa. These two elements are affected by an ensemble of abiotic, biotic, management and socio-economic factors that need to be taken into account to reduce the yield gap, as well as farmers' perceptions and knowledge. In the framework of the project European Union and African Union cooperative research to increase Food production in irrigated farming systems in Africa (EAU4Food project) we are carrying out a participatory innovation process in Chókwè irrigation scheme (Mozambique) based on stakeholders engagement, to test new practices for soil fertility management that can increase yields reducing costs. Through a method combining interviews with three farmers' associations and other relevant stakeholders and soil sampling from the interviewed farmers' plots with the organization of Communities of Practices, we tried to capture how soil fertility is managed by farmers, the constraints they find as well as their perceptions about soil resources. This information was the basis to design and conduct a participatory innovation process where compost made with rice straw and manure is being tested by a farmers' association. Most important limitations of the method are also evaluated. Our results show that socio-economic characteristics of farmers condition how they manage soil fertility and their perceptions. The difficulties they face to adopt new practices for soil fertility management, mainly related to economic resources limitations, labour availability, knowledge time or farm structure, require a systemic understanding that takes into account abiotic, biotic, management and socio-economic factors and their implication as active stakeholders in all phases of the innovation process.

  18. A 25kW fiber-coupled diode laser for pumping applications

    Science.gov (United States)

    Malchus, Joerg; Krause, Volker; Koesters, Arnd; Matthews, David G.

    2014-03-01

    In this paper we report the development of a new fiber-coupled diode laser for pumping applications capable of generating 25 kW with four wavelengths. The delivery fiber has 2.0 mm core diameter and 0.22 NA resulting in a Beam Parameter Product (BPP) of 220 mm mrad. To achieve the specifications mentioned above a novel beam transformation technique has been developed combining two high power laser stacks in one common module. After fast axis collimation and beam reformatting a beam with a BPP of 200 mm mrad x 40 mm mrad in the slow and fast-axis is generated. Based on this architecture a customer-specific pump laser with 25 kW optical output power has been developed, in which two modules are polarization multiplexed for each wavelength (980nm, 1020nm, 1040m and 1060nm). After slow-axis collimation these wavelengths are combined using dense wavelength coupling before focusing onto the fiber endface. This new laser is based on a turn-key platform, allowing straight-forward integration into any pump application. The complete system has a footprint of less than 1.4m² and a height of less than 1.8m. The laser diodes are water cooled, achieve a wall-plug efficiency of up to 60%, and have a proven lifetime of <30,000 hours. The new beam transformation techniques open up prospects for the development of pump sources with more than 100kW of optical output power.

  19. 2.43 kW narrow linewidth linearly polarized all-fiber amplifier based on mode instability suppression

    Science.gov (United States)

    Su, Rongtao; Tao, Rumao; Wang, Xiaolin; Zhang, Hanwei; Ma, Pengfei; Zhou, Pu; Xu, Xiaojun

    2017-08-01

    We demonstrate an experimental study on scaling mode instability (MI) threshold in fiber amplifiers based on fiber coiling. The experimental results show that coiling the active fiber in the cylindrical spiral shape is superior to the coiling in the plane spiral shape. When the polarization maintained Yb-doped fiber (PM YDF: with a core/inner-cladding diameter of 20/400 µm) is coiled on an aluminous plate with a bend diameter of 9-16 cm, the MI threshold is ~1.55 kW. When such a PM YDF is coiled on an aluminous cylinder with diameter of 9 cm, no MI is observed at the output power of 2.43 kW, which is limited by the available pump power. The spectral width and polarization extinction ratio is 0.255 nm and 18.3 dB, respectively, at 2.43 kW. To the best of our knowledge, this is the highest output power from a linear polarized narrow linewidth all-fiberized amplifier. By using a theoretical model, the potential MI-free scaling capability in such an amplifier is estimated to be 3.5 kW.

  20. Small-scale CHP Plant based on a 35 kWel Hermetic Four Cylinder Stirling Engine for Biomass Fuels- Development, Technology and Operating Experiences

    DEFF Research Database (Denmark)

    Obernberger, I.; Carlsen, Henrik; Biedermann, F.

    2003-01-01

    ) process and the Stirling engine process. The ORC process represents an economically interesting technology for small-scale biomass-fired combined heat and power plants in a power range between 400 and 1,500 kWel. A newly developed ORC technology with a nominal electric capacity of 1,000 kW was implemented...... in the biomass CHP plant Lienz (A) in the framework of an EU demonstration project. This plant was put in operation in February 2002. Stirling engines are a promising solution for installations with nominal electric capacities between 10 and 150 kW. A biomass CHP pilot plant based on a 35 kWel-Stirling engine...

  1. Measured performance of a 1.72 kW rooftop grid connected photovoltaic system in Ireland

    International Nuclear Information System (INIS)

    Ayompe, L.M.; Duffy, A.; McCormack, S.J.; Conlon, M.

    2011-01-01

    This paper presents results obtained from monitoring a 1.72 kW p photovoltaic system installed on a flat roof of a 12 m high building in Dublin, Ireland (latitude 53.4 o N and longitude 6.3 o E). The system was monitored between November 2008 and October 2009 and all the electricity generated was fed into the low voltage supply to the building. Monthly average daily and annual performance parameters of the PV system evaluated include: final yield, reference yield, array yield, system losses, array capture losses, cell temperature losses, PV module efficiency, system efficiency, inverter efficiency, performance ratio and capacity factor. The maximum solar radiation, ambient temperature and PV module temperature recorded were 1241 W/m 2 in March, 29.5 o C and 46.9 o C in June respectively. The annual total energy generated was 885.1 kW h/kW p while the annual average daily final yield, reference yield and array yield were 2.41 kW h/kW p /day, 2.85 kW h/kW p /day and 2.62 kW h/kW p /day respectively. The annual average daily PV module efficiency, system efficiency and inverter efficiency were 14.9%, 12.6% and 89.2% respectively while the annual average daily performance ratio and capacity factor were 81.5% and 10.1% respectively. The annual average daily system losses, capture losses and cell temperature losses were 0.23 h/day, 0.22 h/day and 0.00 h/day respectively. Comparison of this system with other systems in different locations showed that the system had the highest annual average daily PV module efficiency, system efficiency and performance ratio of 14.9%, 12.6% and 81.5% respectively. The PV system's annual average daily final yield of 2.4 kW h/kW p /day is higher than those reported in Germany, Poland and Northern Ireland. It is comparable to results from some parts of Spain but it is lower than the reported yields in most parts of Italy and Spain. Despite low insolation levels, high average wind speeds and low ambient temperature improve Ireland

  2. A 1-kW power demonstration from the advanced free electron laser

    International Nuclear Information System (INIS)

    Sheffield, R.L.; Conner, C.A.; Fortgang, C.M.

    1997-01-01

    This is the final report of a one-year, Laboratory-Directed Research and Development (LDRD) project at the Los Alamos National Laboratory (LANL). The main objective of this project was to engineer and procure an electron beamline compatible with the operation of a 1-kW free-electron laser (FEL). Another major task is the physics design of the electron beam line from the end of the wiggler to the electron beam dump. This task is especially difficult because electron beam is expected to have 20 kW of average power and to simultaneously have a 25% energy spread. The project goals were accomplished. The high-power electron design was completed. All of the hardware necessary for high-power operation was designed and procured

  3. New 200 kW, 800 MHz transmitter system for lower hybrid heating

    International Nuclear Information System (INIS)

    Deitz, A.

    1975-07-01

    A new rf heating system which has just been completed and is being installed on the ATC machine is described. The system utilizes four uhf TV klystrons to generate at least 200 kW of power at a frequency of 800 MHz. Pulse widths can be varied from 20 μsec. up to 20 msec. A radar type floating deck modulator along with photo-optical transmitting and receiving devices have been incorporated into the system to provide the pulse fidelity and versatility which characterizes this equipment. Modular construction was emphasized in the design, when possible, to reduce maintenance and down time in the advent of component failure. Hybrid combining techniques are utilized in order to provide two 100 kW feeds into the machine. (U.S.)

  4. Investment issues in nuclear plant license renewal

    International Nuclear Information System (INIS)

    Eynon, R.T.

    1999-01-01

    A method that determines the operating lives for existing nuclear power plants is discussed. These assumptions are the basis for projections of electricity supply through 2020 reported in the Energy Information Administration's (EIA's) Annual Energy Outlook 1999. To determine if plants will seek license renewal, one must first determine if they will be operating to the end of their current licenses. This determination is based on an economic test that assumes an investment of $150/kW will be required after 30 yr of operation for plants with older designs. This expenditure is intended to be equivalent to the cost that would be associated with any of several needs such as a one0time investment to replace aging equipment (steam generators), a series of investments to fix age-related degradation, increases in operating costs, or costs associated with decreased performance. This investment is compared with the cost of building and operating the lowest-cost new plant over the same 10-yr period. If a plant fails this test, it is assumed to be retired after 30 yr of service. All other plants are then considered candidates for license renewal. The method used to determine if it is economic to apply for license renewal and operate plants for an additional 20 yr is to assume that plants face an investment of $250 million after 40 yr of operation to refurbish aging components. This investment is compared with the lowest-cost new plant alternative evaluated over the same 20 yr that the nuclear plant would operate. If the nuclear plant is the lowest cost option, it is projected to continue to operate. EIA projects that it would be economic to extend the operating licenses for 3.7 GW of capacity (6 units)

  5. Non-isolated 30 kW class arcjet PCU

    Science.gov (United States)

    Wong, See-Pok; Britt, Edward J.

    1994-03-01

    A 30 kW class arcjet Power Conditioning Unit, PCU, was built and tested during this Phase 2 SBIR contract. The PCU is an improved version of two previously developed PCU's. All of these units are 3-phase, 20 kHz buck regulators with current mode feed back to modulate the duty cycle to control the arcjet current at any selected operating point. The steady state control can assure arcjet stability despite the negative dynamic resistance of the arc discharge. The system also has a circuit to produce a high voltage start pulse to breakdown the gas and initiate the arc. The start pulse is formed by temporarily switching a short current path across the output terminals with a special solid state switching array. The switches then open rapidly, and the energy stored in the output inductors of the buck regulator produces a pulse of approximately 2500 V for approximately 500 nsec. The system was tested and modified until the transition to steady operation occurred after start up with a very small surge current overshoot. The system also can withstand a direct short circuit across the output without damage. The automatic feed back control simply reduces the duty cycle to hold the current at the set point. When the short is removed the full power output is immediately restored. This latest version arcjet PCU is conduction cooled to remove waste heat by conduction to the base plate. This unit is closer to flight a type of design than the previous functional bread boards. Waste heat is small because the PCU has a very high efficiency, 296 percent. The PCU was extensively tested with resistor loads to simulate operation with an arcjet. The unit was tested with ammonia arcjets at the Jet Propulsion Laboratory. Approximately 400 hours of testing were completed, with several starts. Many hours were also demonstrated with resistive loads. testing with hydrogen arcjets was also carried out at NASA LeRC. &This system concept is now the design base for the ATTD program.

  6. Risks of increased UV-B radiation: higher plants

    International Nuclear Information System (INIS)

    Rau, W.; Hofmann, H.

    1994-01-01

    The question pursued within the Bavarian climate research programme (BayFORKLIM) in the present context was as follows: Does the fact that UV-B radiation increases with growing site elevation mean that the low sensitivity of predominantly alpine plants compared with that of lowland plants is attributable to their different genetic constitution, possibly as a result of selective pressure and/or de alpine species have a greater capacity to develop protective mechanisms? Pairs and triplets of species belonging to the same genus but occuring at different site elevations were grown from seeds in a greenhouse that is, without UV-B. In order to determine their capacity to adapt to UV-B radiation, some of the plants were additionally exposed to UV-B for 5-6 weeks prior to sensitivity testing. Sensitivity was tested by exposing the plants to additional UV-B of different intensities in test chambers. Visible damage, ranging from light bronzing or yellowing to withering, served as an assessment criterion. Levels of UV-B absorbing substances (phenylpropane species, usually flavonoids) were also measured in these plants. The results obtained permit the following conclusions: The greater UV-B resistance of alpine species compared with that of lowland species of the same genus is not attributable to their genetic constitution but rather to their superior adaptability. Superior resistance is in part due to a greater accumulation of UV-B absorbing substances. Distinct differences in sensitivity between different genera could lead to population shifts within ecosystems as a result of increased UV-B radiation. (orig./KW) [de

  7. Diesel fuel to dc power: Navy & Marine Corps Applications

    Energy Technology Data Exchange (ETDEWEB)

    Bloomfield, D.P. [Analytic Power Corp., Boston, MA (United States)

    1996-12-31

    During the past year Analytic Power has tested fuel cell stacks and diesel fuel processors for US Navy and Marine Corps applications. The units are 10 kW demonstration power plants. The USN power plant was built to demonstrate the feasibility of diesel fueled PEM fuel cell power plants for 250 kW and 2.5 MW shipboard power systems. We designed and tested a ten cell, 1 kW USMC substack and fuel processor. The complete 10 kW prototype power plant, which has application to both power and hydrogen generation, is now under construction. The USN and USMC fuel cell stacks have been tested on both actual and simulated reformate. Analytic Power has accumulated operating experience with autothermal reforming based fuel processors operating on sulfur bearing diesel fuel, jet fuel, propane and natural gas. We have also completed the design and fabrication of an advanced regenerative ATR for the USMC. One of the significant problems with small fuel processors is heat loss which limits its ability to operate with the high steam to carbon ratios required for coke free high efficiency operation. The new USMC unit specifically addresses these heat transfer issues. The advances in the mill programs have been incorporated into Analytic Power`s commercial units which are now under test.

  8. TASK 3: PILOT PLANT GASIFIER TESTING

    Energy Technology Data Exchange (ETDEWEB)

    Fusselman, Steve

    2015-11-01

    Aerojet Rocketdyne (AR) has developed an innovative gasifier concept incorporating advanced technologies in ultra-dense phase dry feed system, rapid mix injector, and advanced component cooling to significantly improve gasifier performance, life, and cost compared to commercially available state-of-the-art systems. Design, fabrication and initial testing of the pilot plant compact gasifier was completed in 2011 by a development team led by AR. Findings from this initial test program, as well as subsequent gasifier design and pilot plant testing by AR, identified a number of technical aspects to address prior to advancing into a demonstration-scale gasifier design. Key among these were an evaluation of gasifier ability to handle thermal environments with highly reactive coals; ability to handle high ash content, high ash fusion temperature coals with reliable slag discharge; and to develop an understanding of residual properties pertaining to gasification kinetics as carbon conversion approaches 99%. The gasifier did demonstrate the ability to withstand the thermal environments of highly reactive Powder River Basin coal, while achieving high carbon conversion in < 0.15 seconds residence time. Continuous operation with the high ash fusion temperature Xinyuan coal was demonstrated in long duration testing, validating suitability of outlet design as well as downstream slag discharge systems. Surface area and porosity data were obtained for the Xinyuan and Xinjing coals for carbon conversion ranging from 85% to 97%, and showed a pronounced downward trend in surface area per unit mass carbon as conversion increased. Injector faceplate measurements showed no incremental loss of material over the course of these experiments, validating the commercially traceable design approach and supportive of long injector life goals. Hybrid testing of PRB and natural gas was successfully completed over a wide range of natural gas feed content, providing test data to anchor predictions

  9. Design of a high efficiency 30 kW boost composite converter

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hyeokjin [Univ. of Colorado, Boulder, CO (United States); Chen, Hua [Univ. of Colorado, Boulder, CO (United States); Maksimovic, Dragan [Univ. of Colorado, Boulder, CO (United States); Erickson, Robert W. [Univ. of Colorado, Boulder, CO (United States)

    2015-09-20

    An experimental 30 kW boost composite converter is described in this paper. The composite converter architecture, which consists of a buck module, a boost module, and a dual active bridge module that operates as a DC transformer (DCX), leads to substantial reductions in losses at partial power points, and to significant improvements in weighted efficiency in applications that require wide variations in power and conversion ratio. A comprehensive loss model is developed, accounting for semiconductor conduction and switching losses, capacitor losses, as well as dc and ac losses in magnetic components. Based on the developed loss model, the module and system designs are optimized to maximize efficiency at a 50% power point. Experimental results for the 30 kW prototype demonstrate 98.5%peak efficiency, very high efficiency over wide ranges of power and voltage conversion ratios, as well as excellent agreements between model predictions and measured efficiency curves.

  10. Small hydroelectric power plants - shelf goods or tailor-made?

    International Nuclear Information System (INIS)

    Aas, Trond R.

    2002-01-01

    If small hydroelectric power plants are defined to be hydroelectric power plants of up to a few 1000 kW, they should be shelf goods because of cost considerations. Design of small hydroelectric power plants is a many-sided optimization task, on a level with constructing larger hydro power plants. But the budget for a small hydro power plant does not permit any comprehensive evaluations. The most important costs are the one-time costs in the form of investments and the following annual costs in the form of operation and maintenance, and losses. Financing costs are not considered in this article

  11. NASA fuel cell applications for space: Endurance test results on alkaline fuel cell electrolyzer components

    International Nuclear Information System (INIS)

    Sheibley, D.W.

    1984-01-01

    Fuel cells continue to play a major role in manned spacecraft power generation. The Gemini and Apollo programs used fuel cell power plants as the primary source of mission electrical power, with batteries as the backup. The current NASA use for fuel cells is in the Orbiter program. Here, low temperature alkaline fuel cells provide all of the on-board power with no backup power source. Three power plants per shipset are utilized; the original power plant contained 32-cell substacks connected in parallel. For extended life and better power performance, each power plant now contains three 32-cell substacks connected in parallel. One of the possible future applications for fuel cells will be for the proposed manned Space Station in low earth orbit (LEO)(1, 2, 3). By integrating a water electrolysis capability with a fuel cell (a regenerative fuel cell system), a multikilowatt energy storage capability ranging from 35 kW to 250 kW can be achieved. Previous development work on fuel cell and electrolysis systems would tend to minimize the development cost of this energy storage system. Trade studies supporting initial Space Station concept development clearly show regenerative fuel cell (RFC) storage to be superior to nickel-cadmium and nickel-hydrogen batteries with regard to subsystem weight, flexibility in design, and integration with other spacecraft systems when compared for an initial station power level ranging from 60 kW to 75 kW. The possibility of scavenging residual O 2 and H 2 from the Shuttle external tank for use in fuel cells for producing power also exists

  12. FY 1999 Results of research and development project for polymer electrolyte fuel cells (PEFCs). Development of high current density type 10kW class portable power source systems; 1999 nendo kotai kobunshigata nenryo denchi no kenkyu kaihatsu seika hokokusho. Kodenryu mitsudogata 10kW kyu kahangata dengen system no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Described herein are the FY 1999 results of the research and development project aimed at development of multi-stacked PEFC modules and plate-stack type methanol reformers, and researches on portable power source systems, for development of methanol-air 10kW class (over 0.3W/cm{sup 2}) PEFC systems for portable use by the end of the FY 2000. The programs for the multi-stacked PEFC modules include improvement of tolerance against CO by improvement of catalyst bed and gas passage structures; development of a multi-stacked 5kW class stack structured to prevent fuel starvation; endurance tests conducted at a constant load using a simulated methanol reformate gas; and development, on a trial basis, of the stack using a formed separator. The programs for the plate-stack type methanol reformers include development, on a trial basis, of reforming catalysts integrated with flow passages, combustion catalysts and CO oxidation catalysts, and endurance evaluation tests for the reformer elements. The researches on portable power source systems include studies on, e.g., system control/behavior and efficiency, and basic system designs. The performance and environment endurance tests are also conducted for auxiliary equipment, e.g., blowers. (NEDO)

  13. Construction of a 35 GHz 100 kW gyrotron

    International Nuclear Information System (INIS)

    Aso, Y.; Barroso, J.J.; Castro, P.J.; Correa, R.A.; Ludwing, G.O.; Montes, A.; Morgado, U.T.F.; Nono, M.C.A.; Rossi, J.O.; Silva, P.R.

    1989-09-01

    In this work a description of a 35 GHz 100 kW gyrocon is described which is under construction at the National Space Research Institute Plasma Laboratory. Project conceptual aspects are emphasized, specifically high current density thermionic cathodes, high time and spatial resolution intense magnetic fields generation, high-vacuum systems, techniques of ceramic-metal sealing, and high-voltage electrical modulator circuits. (author). 8 refs., 9 figs., 1 tab

  14. Test results for fuel cell operation on anaerobic digester gas

    Science.gov (United States)

    Spiegel, R. J.; Preston, J. L.

    EPA, in conjunction with ONSI, embarked on a project to define, design, test, and assess a fuel cell energy recovery system for application at anaerobic digester waste water (sewage) treatment plants. Anaerobic digester gas (ADG) is produced at these plants during the process of treating sewage anaerobically to reduce solids. ADG is primarily comprised of methane (57-66%), carbon dioxide (33-39%), nitrogen (1-10%), and a small amount of oxygen (sulfur-bearing compounds (principally hydrogen sulfide) and halogen compounds (chlorides). The project has addressed two major issues: development of a cleanup system to remove fuel cell contaminants from the gas and testing/assessing of a modified ONSI PC25 C fuel cell power plant operating on the cleaned, but dilute, ADG. Results to date demonstrate that the ADG fuel cell power plant can, depending on the energy content of the gas, produce electrical output levels close to full power (200 kW) with measured air emissions comparable to those obtained by a natural gas fuel cell. The cleanup system results show that the hydrogen sulfide levels are reduced to below 10 ppbv and halides to approximately 30 ppbv.

  15. Failure analysis at a 2 kW helium liquefaction facility; Fehleranalyse bei einer 2kW- Heliumverfluessigungsanlage

    Energy Technology Data Exchange (ETDEWEB)

    Klenk, Rafael; Bobien, Steffen; Neumann, Holger [KIT Campus Nord, Eggenstein-Leopoldshafen (Germany). Bereich Kryotechnik

    2016-07-01

    At the Institute for Technical Physics of the KIT Campus Nord helium is cooled respectively liquefied by means of the Claude process. This process is beside the Brayton and Joule-Thomson process meanwhile a standard process for the liquefaction of helium. As example here a 2 kW low-temperature helium facility shall be evaluated by means of different, superordinated failure sources. This consists of condensers, heat exchangers, expansion turbines and a Joule-Thomson valve. The facility respectively component failures are divided in failures of the condenser, turbine units and failures by external factors. For this entries of the last twelve years are token. This listing shall give information about repeating events, so that here directed facility improvements can be token up.

  16. Economic analysis of a 20 kW gasifier; Analise economica de um gaseificador de 20 kW

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Marcos Vinicius Miranda da; Rocha, Brigida Ramati Pereira da [Universidade Federal do Para (NEDS/UFPA), Belem, PA (Brazil). Nucleo de Energia para o Desenvolvimento Sustentavel], e-mail: neds@ufpa.br

    2006-07-01

    The gasification of biomass residues has been pointed as an alternative in electricity supplying for small communities of the Amazon region, because it promotes a significant substitution of the diesel oil in the electric power generation. This paper presents an economic analysis of an electricity generation system (gasifier and generator set) of 20 kw that is installed in the community of Jenipauba, in the State of Para. That analysis confirms the economic attractiveness of that energy alternative on the generator sets that operate exclusively with diesel oil. It also shows the impact of the labor law on electricity generation cost, as well as the need of subsidizing the electric power generation, because the community of Jenipauba is very poor. (author)

  17. End-to-end simulation of a visible 1 kW FEL

    International Nuclear Information System (INIS)

    Parazzoli, Claudio G.; Koltenbah, Benjamin E.C.

    2000-01-01

    In this paper we present the complete numerical simulation of the 1 kW visible Free Electron Laser under construction in Seattle. We show that the goal of producing 1.0 kW at 0.7 μm is well within the hardware capabilities. We simulate in detail the evolution of the electron bunch phase space in the entire e-beam line. The e-beam line includes the photo-injector cavities, the 433.33 MHz accelerator, the magnetic buncher, the 1300 MHz accelerator, the 180 deg. bend and the matching optics into the wiggler. The computed phase space is input for a three-dimensional time-dependent code that predicts the FEL performance. All the computations are based on state of the art software, and the limitations of the current software are discussed. We believe that this is the first time that such a thorough numerical simulation has been carried out and that such a realistic electron phase space has been used in FEL performance calculations

  18. Small scale heater tests in argillite of the Eleana Formation at the Nevada Test Site

    International Nuclear Information System (INIS)

    McVey, D.F.; Thomas, R.K.; Lappin, A.R.

    1979-11-01

    Near-surface heater tests were run in the Eleana Formation at the Nevada Test Site, in an effort to evaluate argillaceous rock for nuclear waste storage. The main test, which employed a full-scale heater with a thermal output approximating commercial borosilicate waste, was designed to operate for several months. Two smaller, scaled tests were run prior to the full-scale test. This report develops the thermal scaling laws, describes the pretest thermal and thermomechanical analysis conducted for these two tests, and discusses the material properties data used in the analyses. In the first test, scaled to a large heater of 3.5 kW power, computed heater temperatures were within 7% of measured values for the entire 96-hour test run. The second test, scaled to a large heater having 5.0 kW power, experienced periodic water in-flow onto the heater, which tended to damp the temperature. For the second test, the computed temperatures were within 7% of measured for the first 20 hours. After this time, the water effect became significant and the measured temperatures were 15 to 20% below those predicted. On the second test, rock surface spallation was noted in the bore hole above the heater, as predicted. The scaled tests indicated that in-situ argillite would not undergo major thermostructural failure during the follow-on, 3.5 kW, full-scale test. 24 figures, 6 tables

  19. Techno-economic analysis of a 2.1 kW rooftop photovoltaic-grid-tied system based on actual performance

    International Nuclear Information System (INIS)

    Adaramola, Muyiwa S.

    2015-01-01

    Highlights: • The economic analysis of rooftop PV grid-tied installation is examined. • Based on actual performance, the LCOE of the system is estimated as US$0.246/kW h. • Feed-in-tariff of US$0.356/kW h is estimated with no financial support. • To encourage installation of PV system, financial support of up to 40% of the investment is suggested. - Abstract: As more attention is being focus on the development of renewable energy resources globally, technical and economic assessments of these resources are crucial to ascertain their viability. These assessments can be more meaningful, if they are based on field and actual performance of the renewable energy conversion systems. This study presents the economic analysis of a rooftop 2.07 kW grid-connected photovoltaic energy system installation located in Ås (59.65°N and longitude 10.76°E, and about 105 m above sea level), Norway. Both the annual and monthly costs of energy produced by the system are determined. In addition, the feed-in tariff that can give internal rate of return of about 7.5% on investment on this installation was examined. Based on assumptions used in this study, feed-in-tariff of US$0.356/kW h is estimated for a project with economic life of 25 years with no other financial support. This translates to US$0.110/kW h premium over the levelized cost of energy of US$0.246/kW h generated by the system. However, if the financial support is more than 45% of the initial investment cost, no further premium fee is necessary to support this type of system

  20. Development program for a 200 kW, cw gyrotron. Quarterly report No. 11, January-March 1982

    International Nuclear Information System (INIS)

    Tancredi, J.J.; Caplan, M.; Sandoval, J.J.; Matranga, V.A.

    1982-01-01

    The objective of this program is the design and development of a millimeter wave device to produce 200 kW of continuous-wave power at 60 GHz. The device, a gyrotron oscillator, will be compatible with power delivery to an electron-cyclotron plasma. Smooth control of RF power output over a 17 dB range is required, and the device should be capable of operation into a severe time-varying load mismatch. During this report period, the beam instability problem which plagued S/N 1 testing was evaluated in more detail. Separate tests were conducted on the gun tester and the lossy drift section, as well as both of these combined, and the results were compared to gyrotron tests on S/N 1. The instability problem now appears to be associated with RF leakage from the cavity

  1. First lasing of the Dutch Fusion-FEM: 730 kW, 200 GHz

    Energy Technology Data Exchange (ETDEWEB)

    Urbanus, W.H. E-mail: urbanus@rijnh.nl; Bongers, W.A.; Geer, C.A.J. van der; Manintveld, P.; Plomp, J.; Pluygers, J.; Poelman, A.J.; Smeets, P.H.M.; Schueller, F.C.; Verhoeven, A.G.A.; Bratman, V.L.; Denisov, G.G.; Savilov, A.V.; Shmelyov, M.Yu.; Caplan, M.; Varfolomeev, A.A

    1999-06-01

    A high-power electrostatic free-electron maser is operated at various frequencies. An output power of 730 kW at 206 GHz is generated with a 7.2 A, 1.77 MeV electron beam, and 360 kW at 167 GHz is generated with a 7.0 A, 1.61 MeV electron beam. It is shown experimentally and by simulations that, depending on the electron beam energy, the FEM can operate in single-frequency regime. First experiments were done without electron beam energy recovery system, and the pulse length was limited to 12 {mu}s. Nevertheless, many aspects of generation of mm-wave power have been explored, such as the dependency on the electron beam energy and beam current and cavity settings such as the feedback coefficient. The achieved parameters and the FEM dynamics are in good accordance with simulations.

  2. 1000 kW ICRH amplifiers for MFTF-B

    International Nuclear Information System (INIS)

    Boksberger, U.

    1986-01-01

    For the startup of the MFTF-B ICRH heating will be applied. Two commercial amplifiers derived from standard broadcast transmitters provide 1000 kW RF power each into a matching system for any VSWR as high as 1.5. Emphasis is put on the specific environment of magnetic fields and seismic loads as well as to the particular RF power control requirements and remote operation. Also addressed is the amplifier's performance into a typical load. The load variations due to the MFTF-B plasma coupling were calculated by TRW

  3. High frequency plant regeneration from mature seed- derived callus ...

    African Journals Online (AJOL)

    PRECIOUS

    2009-12-15

    Dec 15, 2009 ... Ki-Won Lee, Gi Jun Choi, Ki-Yong Kim, Hee Chung Ji, Hyung Soo Park, Sei Hyung Yoon and ... Gramineae family plants (Ha et al., 2001; Dong and Qu, ..... Lee SH, Ahsan N, Lee KW, Kim DH, Lee DG, Kwak SS, Kwon SY, ...

  4. Experience with RTD response time testing in nuclear power plants

    International Nuclear Information System (INIS)

    Hashemian, H.M.; Kerlin, T.W.

    1985-01-01

    The reactor coolant temperatures in pressurized water reactors are measured with platinum resistance temperature detectors (RTDs). The information furnished by these RTDs is used for plant protection as well as control. As a part of the plant protection system, the RTDs must respond to temperature changes in a timely fashion. The RTD response time requirements are different for the various plant types. These requirements are specified in the plant technical specifications in terms of an RTd time constant. The current time constant requirements for nuclear plant RTDs varies from 0.5 seconds to 13.0 seconds depending on the type of the plant. Therefore, different types of RTDs are used in different plants to achieve the required time constants. In addition, in-situ response time tests are periodically performed on protective system RTDs to ensure that the in-service time constants are within acceptable limits as the plant is operating. The periodic testing is important because response time degradation may occur while the RTD ages in the process. Recent response time tests in operating plants revealed unacceptable time constants for several protection system RTDs. As a result, these plants had to be shut down to resolve the problem which in one case was due to improper installation and in another case was because of degradation of a thermal compound used in the thermowell

  5. High power tests of beryllium oxide windows to the lower hybrid current drive launcher in JET

    International Nuclear Information System (INIS)

    Ekedahl, A.; Brandon, M.; Finburg, P.

    1999-01-01

    The vacuum windows to the 3.70 GHz Lower Hybrid Current Drive (LHCD) system in JET were originally designed to withstand 350 kW for 20 s with VSWR ≤ 1.8. High power RF tests of the windows have been carried out in the LHCD test facility at JET. All windows that were tested could operate at 500 kW for 10 s in a matched load. Two windows passed an endurance test at 250 kW for 20 s with the windows terminated in a short circuit. One window also passed this endurance test without active cooling. The results show that this type of window can be used in a new advanced launcher, as proposed for ITER, in which the output power from each klystron (P ≤ 500 kW) will be transmitted through one waveguide and one vacuum window. (author)

  6. A maximum power point tracking scheme for a 1kw stand-alone ...

    African Journals Online (AJOL)

    A maximum power point tracking scheme for a 1kw stand-alone solar energy based power supply. ... Nigerian Journal of Technology ... A method for efficiently maximizing the output power of a solar panel supplying a load or battery bus under ...

  7. Design and Field Tests of an Inverted Based Remote MicroGrid on a Korean Island

    Directory of Open Access Journals (Sweden)

    Woo-Kyu Chae

    2015-08-01

    Full Text Available In this paper, we present the results of an economic feasibility study and propose a system structure to test and maintain electrical stability. In addition, we present real operation results after constructing a remote microgrid on an island in South Korea. To perform the economic feasibility study, a commercial tool called HOMER was used. The developed remote microgrid consists of a 400 kW wind turbine (WT generator, 314 kW photovoltaic (PV generator, 500 kVA × 2 grid forming inverter, 3 MWh lithium ion battery, and an energy management system (EMS. The predicted renewable energy fraction was 91% and real operation result was 82%. The frequency maintaining rate of the diesel power plants was 57% but the remote microgrid was 100%. To improve the operating efficiency of the remote microgrid, we investigated the output range of a diesel generator.

  8. Development of 1000kW-class MCFC pilot plant

    Energy Technology Data Exchange (ETDEWEB)

    Ooue, M.; Yasue, H. [MCFC Research Association, Mie (Japan); Takasu, K.; Tsuchitori, T.

    1996-12-31

    This pilot plant is a part of the New Sunshine Program which has proceeded by the Agency of Industrial Science and Technology of the Ministry of International Trade and Industry. MCFC Research Association is entrusted with the development of the pilot plant, and constructing it at Kawagoe site. Following items will be verified by this pilot plant operation. (a) Development of 250kW class stack and confirmation of stack performance and decay rate. (b) System verification such as basic process, control system and operation characteristics, toward commercialization. (c) To get design data for demonstration plant.

  9. 9 CFR 113.6 - Animal and Plant Health Inspection Service testing.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Animal and Plant Health Inspection Service testing. 113.6 Section 113.6 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION... STANDARD REQUIREMENTS Applicability § 113.6 Animal and Plant Health Inspection Service testing. A...

  10. Technology and testing for the extension of plant life

    International Nuclear Information System (INIS)

    Blumer, U.R.; Edelmann, X.

    1988-01-01

    This paper describes selected portions of a recommended program for the application of equipment-manufacturing-related technology and testing for the extension of life for operating nuclear power plants. It is appropriate to mention that the Swiss nuclear plants, their staffs, and the supporting Swiss nuclear industry are rightfully proud of their record of performance. Plant staffs have been intimately involved in system and equipment design and engineering from the very beginnings of their plants. Maintenance of the plant systems and equipment is referred to as engineering rather than maintenance, because it is viewed as a technical effort and an extension of the original plant and equipment design and construction effort. Care, competence, cleanliness, and attention to detail have been bywords for the Swiss plants. Success has been demonstrated through enviable availability performance. With operation and availability capability already demonstrated, the Swiss are now turning their attention to the extension of plant life. This summary describes some aspects of this work, which is fundamentally based on the application of technology and testing skills developed for equipment manufacture and the original installation of this equipment in the plants, but has been enhanced by research and development (R and D) and an ongoing effort to serve utilities in their maintenance activities

  11. Environmental Impacts From the Installation and Operation of Large-scale Solar Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Fthenakis, V.; Turney, Damon

    2011-04-23

    Large-scale solar power plants are being developed at a rapid rate, and are setting up to use thousands or millions of acres of land globally. The environmental issues related to the installation and operation phases of such facilities have not, so far, been addressed comprehensively in the literature. Here we identify and appraise 32 impacts from these phases, under the themes of land use intensity, human health and well-being, plant and animal life, geohydrological resources, and climate change. Our appraisals assume that electricity generated by new solar power facilities will displace electricity from traditional U.S. generation technologies. Altogether we find 22 of the considered 32 impacts to be beneficial. Of the remaining 10 impacts, 4 are neutral, and 6 require further research before they can be appraised. None of the impacts are negative relative to traditional power generation. We rank the impacts in terms of priority, and find all the high-priority impacts to be beneficial. In quantitative terms, large-scale solar power plants occupy the same or less land per kW h than coal power plant life cycles. Removal of forests to make space for solar power causes CO{sub 2} emissions as high as 36 g CO{sub 2} kW h{sup -1}, which is a significant contribution to the life cycle CO{sub 2} emissions of solar power, but is still low compared to CO{sub 2} emissions from coal-based electricity that are about 1100 g CO{sub 2} kW h{sup -1}.

  12. Small hydropower plants in the region of Mariovo (Macedonia)

    International Nuclear Information System (INIS)

    Panovski, Sotir; Anastasov, Ljupcho

    2003-01-01

    In this paper the results of an initial Pre-feasibility study within the framework of the PHARE Programme for Cross Border Cooperation between Republic of Macedonia and Republic of Greece. In this study we have looked at the existing research originating from three sources. The Strategies for Economic Development of Republic of Macedonia, the Development Plans of the Electric Power Company of Macedonia as well as the existing technical documentation and studies on a level of idea projects for specific location for small hydropower plants in Mariovo region. Furthermore, analysis and evaluation of this documentation is included. Research done in this region has produced evidence of numerous potential locations for small hydropower plants (total of 46) generating power between 58 kW and 4900 kW, discharging between 0,082 m 3 /s and 30 m 3 /s with a head between 6 m and 208 m for which we have detailed data. Furthermore, in the paper we pay attention to the enormous and so far unrealised hydro energetic power which could be utilised by constructing small hydropower plants in Republic of Macedonia. specifically in the Mariovo region. (Original)

  13. Solar Total Energy System, Large Scale Experiment, Shenandoah, Georgia. Final technical progress report. Volume II, Section 3. Facility concept design. [1. 72 MW thermal and 383. 6 kW electric power for 42,000 ft/sup 2/ knitwear plant

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1977-10-17

    The Stearns-Roger Engineering Company conceptual design of ERDA's Large Scale Experiment No. 2 (LSE No. 2) is presented. The various LSEs are part of ERDA's Solar Total Energy Program (STES) and a separate activity of the National Solar Thermal Power Systems Program. The object of this LSE is to design, construct, test, evaluate and operate a STES for the purpose of obtaining experience with large scale hardware systems and to establish engineering capability for subsequent demonstration projects. This particular LSE is to be located at Shenandoah, Georgia, and will provide power to the Bleyle knitwear factory. The Solar Total Energy system is sized to supply 1.720 MW thermal power and 383.6 KW electrical power. The STES is sized for the extended knitwear plant of 3902 M/sup 2/ (42,000 sq-ft) which will eventually employ 300 people. The details of studies conducted for Phase II of the Solar Total Energy System (STES) for the conceptual design requirements of the facility are presented. Included in this section are the detailed descriptions and analyses of the following subtasks: facility concept design, system concept design, performance analysis, operation plan, component and subsystem development, procurement plan, cost estimating and scheduling, and technical and management plans. (WHK)

  14. Power ramp rate capabilities of a 5 kW proton exchange membrane fuel cell system with discrete ejector control

    Science.gov (United States)

    Nikiforow, K.; Pennanen, J.; Ihonen, J.; Uski, S.; Koski, P.

    2018-03-01

    The power ramp rate capabilities of a 5 kW proton exchange membrane fuel cell (PEMFC) system are studied theoretically and experimentally for grid support service applications. The fuel supply is implemented with a fixed-geometry ejector and a discrete control solution without any anode-side pressure fluctuation suppression methods. We show that the stack power can be ramped up from 2.0 kW to 4.0 kW with adequate fuel supply and low anode pressure fluctuations within only 0.1 s. The air supply is implemented with a centrifugal blower. Air supply ramp rates are studied with a power increase executed within 1 and 0.2 s after the request, the time dictated by grid support service requirements in Finland and the UK. We show that a power ramp-up from 2.0 kW to 3.7 kW is achieved within 1 s with an initial air stoichiometry of 2.5 and within 0.2 s with an initial air stoichiometry of 7.0. We also show that the timing of the power ramp-up affects the achieved ancillary power capacity. This work demonstrates that hydrogen fueled and ejector-based PEMFC systems can provide a significant amount of power in less than 1 s and provide valuable ancillary power capacity for grid support services.

  15. Oak Ridge rf Test Facility

    International Nuclear Information System (INIS)

    Gardner, W.L.; Hoffman, D.J.; McCurdy, H.C.; McManamy, T.J.; Moeller, J.A.; Ryan, P.M.

    1985-01-01

    The rf Test Facility (RFTF) of Oak Ridge National Laboratory (ORNL) provides a national facility for the testing and evaluation of steady-state, high-power (approx.1.0-MW) ion cyclotron resonance heating (ICRH) systems and components. The facility consists of a vacuum vessel and two fully tested superconducting development magnets from the ELMO Bumpy Torus Proof-of-Principle (EBT-P) program. These are arranged as a simple mirror with a mirror ratio of 4.8. The axial centerline distance between magnet throat centers is 112 cm. The vacuum vessel cavity has a large port (74 by 163 cm) and a test volume adequate for testing prototypic launchers for Doublet III-D (DIII-D), Tore Supra, and the Tokamak Fusion Test Reactor (TFTR). Attached to the internal vessel walls are water-cooled panels for removing the injected rf power. The magnets are capable of generating a steady-state field of approx.3 T on axis in the magnet throats. Steady-state plasmas are generated in the facility by cyclotron resonance breakdown using a dedicated 200-kW, 28-GHz gyrotron. Available rf sources cover a frequency range of 2 to 200 MHz at 1.5 kW and 3 to 18 MHz at 200 kW, with several sources at intermediate parameters. Available in July 1986 will be a >1.0-MW, cw source spanning 40 to 80 MHz. 5 figs

  16. Modeling and Simulation for an 8 kW Three-Phase Grid-Connected Photo-Voltaic Power System

    OpenAIRE

    Cen Zhaohui

    2017-01-01

    Gird-connected Photo-Voltaic (PV) systems rated as 5-10 kW level have advantages of scalability and energy-saving, so they are very typical for small-scale household solar applications. In this paper, an 8 kW three-phase grid-connected PV system model is proposed and studied. In this high-fidelity model, some basic PV system components such as solar panels, DC-DC converters, DC-AC inverters and three-phase utility grids are mathematically modelled and organized as a complete simulation model....

  17. Hanstholm phase 2B. Offshore wave energy test 1994 - 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The wave power converter consists of a float 2.5 meter in diameter, connected by a rope to a seabed-mounted piston pump, installed on 25 meter deep water 2,5 km offshore Hanstholm, Denmark. The converter is designed to absorb an average maximum power of 1 kW. Measured data in real sea conditions are compared to results based on computer simulations and previous tank testing. Losses caused by rope elasticity and hysteresis, friction in the pump and back flow through the valves are assessed. The economic perspectives of a large wave power plant are presented, based on a revised prototype incorporating the results and experience gained during the test period. The wave energy conversion test `Hanstholm phase 2B` has showed, that it it technically possible to exploit the offshore wave energy resource. This source of energy could become attractive for commercial enterprise. The wave power converter demonstrated a reliable performance over a period of nine months. It produced energy under all wave conditions and survived storm waves of 9,6 m. A 300 MW wave power plant in the Danish part of the North sea is estimated to produce electricity at a cost between 2,1 - 2,4 DKK/kWh. The electrical transmission to shore contribute to approximately 20% of the cost. New data predict a potential of 23 kW per meter wave front. The energy plan Energy 21 proposed by the Danish Department of Energy, includes a scenario incorporating wave energy in the energy system year 2030. A strategy for the development of wave energy, has been proposed as part of the project OWEC-1 supported by the European Joule R and D programme. A proposal for future Danish initiatives to develop second generation point absorber systems is outlined. (ARW) 29 refs.

  18. Development of super-synchronization speed control assembly for 2500 kW double-fed motor

    International Nuclear Information System (INIS)

    Li Huajun; Xuan Weimin; Peng Jianfei; Hu Haotian; Wang Shujing; Kang Li; Xu Lirong; Huang Zhaorong; Wang Xiaoping; Du Cang; Liu Ling

    2007-01-01

    The super-synchronization speed control assemblies for the two 2500 kW induction motors have been developed successfully in order to meet the need for toroidal field increasing in HL-2A tokamak. Based on the a.c./a.c. cycloconverter, the speed of each 2500 kW motor has been regulated by means of vector control technology for double-fed motor. The highest rotate speed of the two 80 MVA generator sets have been increased from 1488 rpm rated speed to 1650 rpm and the released energy of each generator set in one pulse discharge can reach 500 MJ. Therefore the toroidal field system is able to reach 2.8T for experiment. (authors)

  19. Engineering aspects of a thermal control subsystem for the 25 kW power module

    Science.gov (United States)

    Schroeder, P. E.

    1979-01-01

    The paper presents the key trade study results, analysis results, and the recommended thermal control approach for the 25 kW power module defined by NASA. Power conversion inefficiencies and component heat dissipation results in a minimum heat rejection requirement of 9 kW to maintain the power module equipment at desired temperature levels. Additionally, some cooling capacity should be provided for user payloads in the sortie and free-flying modes. The baseline thermal control subsystem includes a dual-loop-pumped Freon-21 coolant with the heat rejected from deployable existing orbiter radiators. Thermal analysis included an assessment of spacecraft orientations, radiator shapes and locations, and comparison of hybrid heat pipe and all liquid panels.

  20. Novel weapons testing: are invasive plants more chemically defended than native plants?

    Directory of Open Access Journals (Sweden)

    Eric M Lind

    2010-05-01

    Full Text Available Exotic species have been hypothesized to successfully invade new habitats by virtue of possessing novel biochemistry that repels native enemies. Despite the pivotal long-term consequences of invasion for native food-webs, to date there are no experimental studies examining directly whether exotic plants are any more or less biochemically deterrent than native plants to native herbivores.In a direct test of this hypothesis using herbivore feeding assays with chemical extracts from 19 invasive plants and 21 co-occurring native plants, we show that invasive plant biochemistry is no more deterrent (on average to a native generalist herbivore than extracts from native plants. There was no relationship between extract deterrence and length of time since introduction, suggesting that time has not mitigated putative biochemical novelty. Moreover, the least deterrent plant extracts were from the most abundant species in the field, a pattern that held for both native and exotic plants. Analysis of chemical deterrence in context with morphological defenses and growth-related traits showed that native and exotic plants had similar trade-offs among traits.Overall, our results suggest that particular invasive species may possess deterrent secondary chemistry, but it does not appear to be a general pattern resulting from evolutionary mismatches between exotic plants and native herbivores. Thus, fundamentally similar processes may promote the ecological success of both native and exotic species.

  1. The Tore Supra Lower Hybrid Test Bed : improvements and applications

    International Nuclear Information System (INIS)

    Delpech, L.; Achard, J.; Beaumont, B.

    2006-01-01

    Within the CIMES project framework in Tore Supra, a klystron TH2103C (3.7 GHz) is under development at THALES ELECTRON DEVICES. It differs from the previous klystrons used in Tore Supra generator mainly in that it has no modulating anode, the RF output power will reach 700 kW CW, by raising the High Voltage value to 76 kV and a beam current up to 23 A. The Tore Supra test bed is a dedicated facility used for high power tests on RF components or on RF transmitters. It has been improved to integrate the TH2103C klystron and a specific 100 kV solide state switch which control the beam current. Since April 2005, the integration of the first tube (without modulating anode) and the 100 kV switch has been completed in the Test Bed and has allowed the modifications and tests of the interfaces and security system for the devices. Improvements were also made on the cooling loop flow to dissipate a power of 1750 kW CW. With these devices, the RF power routinely available in the Lower Hybrid Test Bed is 400 kW CW. With the development of the TH2103C, detailed studies and tests on RF components which will be used up to 750 kW CW on match load or 700 kW on VSWR = 1.4, are necessary to evaluate their performances and thermal behaviour. The test a crucial component, the recombiner, which adds the RF powers coming from the two RF outputs of the TH2103C and inject the resulted power into one WR284 waveguide to a test load or to the plasma, was completed. Two tests have been performed : a thermal study with 400 kW during 1000 s, and RF pulsed tests on short cuts to increase the value of the electric field inside the component. The experiments and calculations (ANSYS and HFSS codes) validate the use of this device with the TH2103C. A module made with two different Beryllium Oxide RF windows, has been under test. The losses on each window are measured by calorimetric measurements and evaluated by computation with HFSS and ANSYS code. The results are compared. In this paper, the

  2. Design of the 50 kW neutron converter for SPIRAL2 facility

    Energy Technology Data Exchange (ETDEWEB)

    Avilov, M.S. [Budker Institute of Nuclear Physics, 630090 Novosibirsk, SB RAS (Russian Federation); Tecchio, L.B., E-mail: tecchio@lnl.infn.i [Laboratori Nazionali di Legnaro, 35020 Legnaro (Italy); Titov, A.T. [Boreskov Institute of Catalysis, 630090 Novosibirsk, SB RAS (Russian Federation); Tsybulya, V.S. [Trofimuk Institute of Geology, 630090 Novosibirsk, SB RAS (Russian Federation); Zhmurikov, E.I. [Budker Institute of Nuclear Physics, 630090 Novosibirsk, SB RAS (Russian Federation)

    2010-06-21

    SPIRAL2 is a facility for the study of fundamental nuclear physics and multidisciplinary research. SPIRAL2 represents a major advance for research on exotic nuclei. The radioactive ion beam (RIB) production system is comprised of a neutron converter, a target and an ion source. This paper is dedicated to the designing of the 50 kW neutron converter for the SPIRAL2 facility. Among the different variants of the neutron converter, the one based on a rotating solid disk seems quite attractive due to its safety, ease in production and relatively low cost. Dense graphite used as the converter's material allows the production of high-intensity neutron flux and, at the same time, the heat removal from the converter by means of radiation cooling. Thermo-mechanical simulations performed in order to determine the basic geometry and physical characteristics of the neutron production target for SPIRAL2 facility, to define the appropriate beam power distribution, and to predict the target behaviour under the deuteron beam of nominal parameters (40 MeV, 1.2 mA, 50 kW) are presented. To study the main physical and mechanical properties and serviceability under operating conditions, several kinds of graphite have been analyzed and tested. The paper reports the results of such measurements. Radiation damage is the most important issue for the application of graphite as neutron converter. It is well known that the thermal conductivity of the neutron-irradiated graphite is reduced by a factor of 10 from the initial value after irradiation. Difference in volume expansions between the matrix and the fiber results in serious damage of neutron-irradiated C/C composites. Calculations showed that at high temperature the effect of neutron radiation is not so critical and that the change in thermal conductivity does not prevent the use of graphite as neutron converter.

  3. Design of the 50 kW neutron converter for SPIRAL2 facility

    International Nuclear Information System (INIS)

    Avilov, M.S.; Tecchio, L.B.; Titov, A.T.; Tsybulya, V.S.; Zhmurikov, E.I.

    2010-01-01

    SPIRAL2 is a facility for the study of fundamental nuclear physics and multidisciplinary research. SPIRAL2 represents a major advance for research on exotic nuclei. The radioactive ion beam (RIB) production system is comprised of a neutron converter, a target and an ion source. This paper is dedicated to the designing of the 50 kW neutron converter for the SPIRAL2 facility. Among the different variants of the neutron converter, the one based on a rotating solid disk seems quite attractive due to its safety, ease in production and relatively low cost. Dense graphite used as the converter's material allows the production of high-intensity neutron flux and, at the same time, the heat removal from the converter by means of radiation cooling. Thermo-mechanical simulations performed in order to determine the basic geometry and physical characteristics of the neutron production target for SPIRAL2 facility, to define the appropriate beam power distribution, and to predict the target behaviour under the deuteron beam of nominal parameters (40 MeV, 1.2 mA, 50 kW) are presented. To study the main physical and mechanical properties and serviceability under operating conditions, several kinds of graphite have been analyzed and tested. The paper reports the results of such measurements. Radiation damage is the most important issue for the application of graphite as neutron converter. It is well known that the thermal conductivity of the neutron-irradiated graphite is reduced by a factor of 10 from the initial value after irradiation. Difference in volume expansions between the matrix and the fiber results in serious damage of neutron-irradiated C/C composites. Calculations showed that at high temperature the effect of neutron radiation is not so critical and that the change in thermal conductivity does not prevent the use of graphite as neutron converter.

  4. 5 MeV 300 kW electron accelerator project

    International Nuclear Information System (INIS)

    Auslender, V.L.; Cheskidov, V.G.; Gornakov, I.V.

    2004-01-01

    The paper presents a project of a high power linear accelerator for industrial applications. The accelerator has a modular structure and consists of the chain of accelerating cavities connected by the axis-located coupling cavities with coupling slots in the common walls. Main parameters of the accelerator are: operating frequency of 176 MHz, electron energy of up to 5 MeV, average beam power of 300 kW. The required RF pulse power can be supplied by the TH628 diacrode

  5. Preparation for full scale demonstration of an air staged gasifier plant. Technical project development; For combined heat and power production with wood chips; Forberedelse til fuldskala demonstration af trinopdelt forgasningsanlaeg. Teknisk projektudvikling. Delrapport

    Energy Technology Data Exchange (ETDEWEB)

    Houmann Jakobsen, H.

    2011-04-15

    The project has aimed to further develop the technology for staged biomass gasification and establish an organizational and financial model to ensure that the technology can be introduced on the market. This report describes the technique in an upcoming demonstration plant. A complete planning and design of a demonstration plant with a capacity of 300 kW electric power and 700 kW heat was prepared. That is four times more than the pilot plant at Graested District Heating (Castor plant) can produce. A full scale demonstration plant with bio-gasification technology for wood chips will be established and put into operation in 2012. (ln)

  6. Pb-H2O Thermogravimetric Plants. The Rankine Cycle

    International Nuclear Information System (INIS)

    Arosio, S.; Carlevaro, R.

    2000-01-01

    An economic evaluation concerning Pb-H 2 O thermogravimetric systems with an electric power in the range 200-1.000 kW has been done. Moreover, plant and running costs for a thermogravimetric and a Rankine cycle, 1 MW power, have been compared. Basically due to the lead charge, the plant cost of the former is higher: nevertheless such amount can be recuperated in less than three years, being higher the running cost of the latter [it

  7. Retrofit of distillation columns in biodiesel production plants

    International Nuclear Information System (INIS)

    Nguyen, Nghi; Demirel, Yasar

    2010-01-01

    Column grand composite curves and the exergy loss profiles produced by the Column-Targeting Tool of the Aspen Plus simulator are used to assess the performance of the existing distillation columns, and reduce the costs of operation by appropriate retrofits in a biodiesel production plant. Effectiveness of the retrofits is assessed by means of thermodynamics and economic improvements. We have considered a biodiesel plant utilizing three distillation columns to purify biodiesel (fatty acid methyl ester) and byproduct glycerol as well as reduce the waste. The assessments of the base case simulation have indicated the need for modifications for the distillation columns. For column T202, the retrofits consisting of a feed preheating and reflux ratio modification have reduced the total exergy loss by 47%, while T301 and T302 columns exergy losses decreased by 61% and 52%, respectively. After the retrofits, the overall exergy loss for the three columns has decreased from 7491.86 kW to 3627.97 kW. The retrofits required a fixed capital cost of approximately $239,900 and saved approximately $1,900,000/year worth of electricity. The retrofits have reduced the consumption of energy considerably, and leaded to a more environmentally friendly operation for the biodiesel plant considered.

  8. Micro-scale energy valorization of grape marcs in winery production plants

    International Nuclear Information System (INIS)

    Fabbri, Andrea; Bonifazi, Giuseppe; Serranti, Silvia

    2015-01-01

    Highlights: • BioMethane Potential of grape marcs was investigated. • Grape marcs were characterized to realize a micro-scale energy recovery. • Comparative BMP batch-tests utilizing lab-scale reactors were performed. • Biogas valorization by grape marcs anaerobic digestion at small scale is evaluated. - Abstract: The BiochemicalMethanePotential (BMP) of winery organic waste, with reference to two Italian red and white grapes (i.e. Nero Buono and Greco) by-products was investigated. The study was carried out to verify the possibility to reduce the production impact in a green-waste-management-chain-perspective. The possibility to efficiently utilize wine-related-by-products for energy production at a micro-scale (i.e. small-medium scale winery production plant) was also verified. Results showed as a good correlation can be established between the percentage of COD removal and the biogas production, as the winery can produce, from its waste methanization, about 7800 kW h year −1 electrical and 8900 kW h year −1 thermal. A critical evaluation was performed about the possibility to utilize the proposed approach to realize an optimal biomass waste management and an energetic valorization in a local-energy-production-perspective

  9. Gas turbine cogeneration plant for textile dyeing plant in Italy

    International Nuclear Information System (INIS)

    Tonetti, P.E.

    1991-01-01

    This paper reports the information (i.e., notes on specific plant component weaknesses and defects, e.g., exchanger tube fouling, improper positioning of temperature probes, incorrect choice of flow valves, etc., and relative remedial actions) gained during a one year cogeneration plant debugging campaign at the Colorama textile dyeing plant in Italy. The cogeneration plant consists of a Solar Saturn MK III gas turbine (1,080 kw at terminals, 500 degrees C exhaust gas temperature); a double (steam and hot water) circuit waste heat boiler contemporaneously producing, with 100 degrees C supply water, 4 tonnes/h steam at 5 bars and 9 cubic meters/h of 20 to 80 degrees C hot water; and a 1,470 kVA generator operating at 3 kV connected by a 3kV/15kV transformer to the national grid. The plant is protected against fire by independent halon fire protection systems, one for the gas turbine plant, the other, for the control room. A modem connects the plant control and monitoring system with the firm which supplied the equipment. The plant operator cites an urgent national requirement for trained cogeneration equipment technical consultants and designers in order to better promote the use of innovative cogeneration technology by Italian industry

  10. GIS-Based KW-GIUH hydrological model of semiarid catchments: The case of Faria Catchment, Palestine

    International Nuclear Information System (INIS)

    Shadeed, S.; Shaheen, H.; Jayyousi, A.

    2007-01-01

    Among the most basic challenges of hydrology are the quantitative understanding of the processes of runoff generation and prediction of flow hydrographs. Traditional techniques have been widely applied for the estimation of runoff hydrographs of gauged catchments using historical rainfall-runoff data and unit hydrographs. Such procedures are questioned as to their reliability and their application to ungauged, arid and semiarid catchments. To overcome such difficulties, the use of physically based rainfall-runoff process of Faria Catchment using the lately developed KW-GIUH. Faria catchment, located in the northeastern part of the West Bank, Palestine, is characterized as a semiarid region with annual rainfall depths ranging on average from 150 to 640 mm at both ends of the catchment. The Geographical Information System (GIS) techniques were used to shape the geomorphological features of the catchment. A GIS based KW-GIUH hydrological model was used to stimulate the rainfall-runoff process in the three sub-catchments of Faria, namely: Al-Badan, Al-Faria and Al-Malaqi. The simulated runoff hydrographs proved that the GIS-based KW-GIUH model is applicable to semiarid regions and can be used to estimate the unit hydrographs in the West Bank catchments. (author)

  11. TERRESTRIAL PLANT REPRODUCTIVE TESTING: SHOULD WILDLIFE TOXICOLOGISTS CARE?

    Science.gov (United States)

    Standard phytotoxicity testing using the seedling emergence and vegetative vigor tests have been shown to be inadequate for the protection of plant reproduction. Both experimental evidence and unintended field exposures have shown vegetation can be minimally or not significantly...

  12. The first metallurgical tests on plutonium

    International Nuclear Information System (INIS)

    Grison, E.; Abramson, R.; Anselin, F.; Monti, H.

    1958-01-01

    Metallic plutonium was first prepared in France in January 1956, as soon as we had access to quantities of the order of several grams of plutonium, which had been extracted from the rods of the pile EL2 at Saclay. Since up to the present this reactor, of thermal power 2 000 kW, has been our only source of plutonium, we have so far only worked on experimental quantities sufficient for the basic tests but not for tests on a scale of possible applications. It is this work, carried out during this phase of preliminary research, which is described below. With the starting up of the plutonium extraction plant at Marcoule, where the reactor G1 has been operating at power for more than a year, we shall go on next to a another order of magnitude which will allow the manufacture and experimentation of prototype fuel elements. (author) [fr

  13. Metal membrane-type 25-kW methanol fuel processor for fuel-cell hybrid vehicle

    Science.gov (United States)

    Han, Jaesung; Lee, Seok-Min; Chang, Hyuksang

    A 25-kW on-board methanol fuel processor has been developed. It consists of a methanol steam reformer, which converts methanol to hydrogen-rich gas mixture, and two metal membrane modules, which clean-up the gas mixture to high-purity hydrogen. It produces hydrogen at rates up to 25 N m 3/h and the purity of the product hydrogen is over 99.9995% with a CO content of less than 1 ppm. In this fuel processor, the operating condition of the reformer and the metal membrane modules is nearly the same, so that operation is simple and the overall system construction is compact by eliminating the extensive temperature control of the intermediate gas streams. The recovery of hydrogen in the metal membrane units is maintained at 70-75% by the control of the pressure in the system, and the remaining 25-30% hydrogen is recycled to a catalytic combustion zone to supply heat for the methanol steam-reforming reaction. The thermal efficiency of the fuel processor is about 75% and the inlet air pressure is as low as 4 psi. The fuel processor is currently being integrated with 25-kW polymer electrolyte membrane fuel-cell (PEMFC) stack developed by the Hyundai Motor Company. The stack exhibits the same performance as those with pure hydrogen, which proves that the maximum power output as well as the minimum stack degradation is possible with this fuel processor. This fuel-cell 'engine' is to be installed in a hybrid passenger vehicle for road testing.

  14. Stand-alone version of the 11kW Gaia wind turbine

    DEFF Research Database (Denmark)

    Bindner, H.; Rosas, P.A.C.; Teodorescu, R.

    2004-01-01

    This report describes the development of a stand-alone version of the 11kW Gaia wind turbine. Various possible configurations are investigated and a configuration using a back-to-back converter is chosen. A model is developed for controller design of thefast controllers of the unit. Controllers...... assessment and controller design a dynamic performance assessment model has been developed....

  15. Grid Support in Large Scale PV Power Plants using Active Power Reserves

    DEFF Research Database (Denmark)

    Craciun, Bogdan-Ionut

    to validate the performance of the frequency support functions, a flexible grid model with IEEE 12 bus system characteristics has been developed and implemented in RTDS. A power hardware-in-the-loop (PHIL) system composed by 20 kW plant (2 x 10 kW inverters and PV linear simulator) and grid simulator (RTDS......Photovoltaic (PV) systems are in the 3rd place in the renewable energy market, after hydro and wind power. The increased penetration of PV within the electrical power system has led to stability issues of the entire grid in terms of its reliability, availability and security of the supply....... As a consequence, Large scale PV Power Plants (LPVPPs) operating in Maximum Power Point (MPP) are not supporting the electrical network, since several grid triggering events or the increased number of downward regulation procedures have forced European Network of Transmission System Operators for Electricity...

  16. Identification of Radioactive Pilot-Plant test requirements

    Energy Technology Data Exchange (ETDEWEB)

    Powell, W.J.; Riebling, E.F.

    1995-05-09

    Radioactive Pilot-Plant testing needs and alternatives are evaluated for enhanced Sludge Washing and High and Low-Level Vitrification efforts. Also investigated was instrument and equipment testing needs associated with the vitrification and retrieval process. The scope of this document is to record the existing March 1994 letter report for future use. A structured Kepner-Trego{trademark} decision analysis process was used to assist analysis of the testing needs. This analysis provided various combinations of laboratory and radioactive (hot) and cold pilot testing options associated with the above need areas. Recommendations for testing requirements were made.

  17. Identification of Radioactive Pilot-Plant test requirements

    International Nuclear Information System (INIS)

    Powell, W.J.; Riebling, E.F.

    1995-01-01

    Radioactive Pilot-Plant testing needs and alternatives are evaluated for enhanced Sludge Washing and High and Low-Level Vitrification efforts. Also investigated was instrument and equipment testing needs associated with the vitrification and retrieval process. The scope of this document is to record the existing March 1994 letter report for future use. A structured Kepner-Trego trademark decision analysis process was used to assist analysis of the testing needs. This analysis provided various combinations of laboratory and radioactive (hot) and cold pilot testing options associated with the above need areas. Recommendations for testing requirements were made

  18. 12 MeV, 4.3 kW electron linear accelerator irradiation application

    International Nuclear Information System (INIS)

    Hang Desheng; Lai Qiji

    2000-01-01

    Characteristics of an electron linear accelerator, which has 6-12 MeV energy, 4.2 kW average beam power is introduced. Results show that it has advantages on improving the characteristics of semiconductor devices such as diodes, triodes, SCR, preventing garlic from sprout, preservation of food, and so on

  19. PVUSA procurement, acceptance, and rating practices for photovoltaic power plants

    Energy Technology Data Exchange (ETDEWEB)

    Dows, R.N.; Gough, E.J.

    1995-09-01

    This report is one in a series of PVUSA reports on PVUSA experiences and lessons learned at the demonstration sites in Davis and Kerman, California, and from participating utility host sites. During the course of approximately 7 years (1988--1994), 10 PV systems have been installed ranging from 20 kW to 500 kW. Six 20-kW emerging module technology arrays, five on universal project-provided structures and one turnkey concentrator, and four turnkey utility-scale systems (200 to 500 kW) were installed. PVUSA took a very proactive approach in the procurement of these systems. In the absence of established procurement documents, the project team developed a comprehensive set of technical and commercial documents. These have been updated with each successive procurement. Working closely with vendors after the award in a two-way exchange provided designs better suited for utility applications. This report discusses the PVUSA procurement process through testing and acceptance, and rating of PV turnkey systems. Special emphasis is placed on the acceptance testing and rating methodology which completes the procurement process by verifying that PV systems meet contract requirements. Lessons learned and recommendations are provided based on PVUSA experience.

  20. Achievement report for fiscal 1998 on joint research business (2/2). Photovoltaic power generation field test for public facilities; 1998 nendo kokyo shisetsu nadoyo taiyoko hatsuden field test jigyo (2/2). Kyodo kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    Photovoltaic power generation systems are experimentally installed at public facilities at various locations, and subjected to field tests in which they experience long-term operation under real loads. Mie Prefectural Iidaka Senior/Junior High School has a 10kW solar cell system installed on the south-side roof of the school house. The system is linked to an in-house transformation station and the power generated by the system is supplied to the lighting and air-conditioning facilities in the building, and surplus if any is transmitted to the Chubu Electric Power Co., Inc., system. A field test is being conducted to determine if there are usability and safety in the 10kW system. A number of like systems are undergoing field tests, installed at a comprehensive technological training center of Kyushu Electric Power Safety Association, Kongo Gakuen Senior High School, Sakata Nursery School, Taiyo Daiichi Nursery School, Minami Kindergarten, Neyagawa Ishizu Old People's Home, Co-Op Living Konan, Factory Hishimeki, Tochigi Fuji Industries, Gamo-cho Hirabayashi Public Hall, Fukuoka Prefectural Culture Complex, Yatsusugi Forest Schooling Center, Osaka Prefectural Murano Water Purification Plant, Yamanashi Institute of Environmental Sciences, Utatsu-cho Town Office, Ginga Gakuen Junior High School, etc. (NEDO)

  1. Achievement report for fiscal 1998 on joint research business (2/2). Photovoltaic power generation field test for public facilities; 1998 nendo kokyo shisetsu nadoyo taiyoko hatsuden field test jigyo (2/2). Kyodo kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    Photovoltaic power generation systems are experimentally installed at public facilities at various locations, and subjected to field tests in which they experience long-term operation under real loads. Mie Prefectural Iidaka Senior/Junior High School has a 10kW solar cell system installed on the south-side roof of the school house. The system is linked to an in-house transformation station and the power generated by the system is supplied to the lighting and air-conditioning facilities in the building, and surplus if any is transmitted to the Chubu Electric Power Co., Inc., system. A field test is being conducted to determine if there are usability and safety in the 10kW system. A number of like systems are undergoing field tests, installed at a comprehensive technological training center of Kyushu Electric Power Safety Association, Kongo Gakuen Senior High School, Sakata Nursery School, Taiyo Daiichi Nursery School, Minami Kindergarten, Neyagawa Ishizu Old People's Home, Co-Op Living Konan, Factory Hishimeki, Tochigi Fuji Industries, Gamo-cho Hirabayashi Public Hall, Fukuoka Prefectural Culture Complex, Yatsusugi Forest Schooling Center, Osaka Prefectural Murano Water Purification Plant, Yamanashi Institute of Environmental Sciences, Utatsu-cho Town Office, Ginga Gakuen Junior High School, etc. (NEDO)

  2. Design and development of a 6 MW peak, 24 kW average power S-band klystron

    Energy Technology Data Exchange (ETDEWEB)

    Joshi, L.M.; Meena, Rakesh; Nangru, Subhash; Kant, Deepender; Pal, Debashis; Lamba, O.S.; Jindal, Vishnu; Jangid, Sushil Kumar, E-mail: joslm@rediffmail.com [Central Electronics Engineering Research Institute, Council of Scientific and Industrial Research, Pilani (India); Chakravarthy, D.P.; Dixit, Kavita [Bhabha Atomic Research Centre, Mumbai (India)

    2011-07-01

    A 6 MW peak, 24 kW average power S-band Klystron is under development at CEERI, Pilani under an MoU between BARC and CEERI. The design of the klystron has been completed. The electron gun has been designed using TRAK and MAGIC codes. RF cavities have been designed using HFSS and CST Microwave Studio while the complete beam wave interaction simulation has been done using MAGIC code. The thermal design of collector and RF window has been done using ANSYS code. A Gun Collector Test Module (GCTM) was developed before making actual klystron to validate gun perveance and thermal design of collector. A high voltage solid state pulsed modulator has been installed for performance valuation of the tube. The paper will cover the design aspects of the tube and experimental test results of GCTM and klystron. (author)

  3. Design and development of a 6 MW peak, 24 kW average power S-band klystron

    International Nuclear Information System (INIS)

    Joshi, L.M.; Meena, Rakesh; Nangru, Subhash; Kant, Deepender; Pal, Debashis; Lamba, O.S.; Jindal, Vishnu; Jangid, Sushil Kumar; Chakravarthy, D.P.; Dixit, Kavita

    2011-01-01

    A 6 MW peak, 24 kW average power S-band Klystron is under development at CEERI, Pilani under an MoU between BARC and CEERI. The design of the klystron has been completed. The electron gun has been designed using TRAK and MAGIC codes. RF cavities have been designed using HFSS and CST Microwave Studio while the complete beam wave interaction simulation has been done using MAGIC code. The thermal design of collector and RF window has been done using ANSYS code. A Gun Collector Test Module (GCTM) was developed before making actual klystron to validate gun perveance and thermal design of collector. A high voltage solid state pulsed modulator has been installed for performance valuation of the tube. The paper will cover the design aspects of the tube and experimental test results of GCTM and klystron. (author)

  4. Monitoring of biogas test plants

    DEFF Research Database (Denmark)

    Holm-Nielsen, Jens Bo; Esbensen, Kim H.

    2011-01-01

    realistic bioreactor scales, it is necessary to obtain a fairly constant level of volatile fatty acid (VFA) concentration, which furthers a stable biogas production. Uncontrolled VFA contents have a significant negative impact on biogas production; VFA concentrations should not exceed 5–6000 mg/L lest......Most studies reported in the literature have investigated near infrared spectroscopy (NIR) in laboratory-scale or minor pilot biogas plants only; practically no other studies have examined the potential for meso-scale/full-scale on-line process monitoring. The focus of this study is on a meso......-scale biogas test plant implementation of process analytical technologies (PAT) to develop multivariate calibration/prediction models for anaerobic digestion (AD) processes. A 150 L bioreactor was fitted with a recurrent loop at which NIR spectroscopy and attendant reference sampling were carried out. In all...

  5. Transfer of Plutonium-Uranium Extraction Plant and N Reactor irradiated fuel for storage at the 105-KE and 105-KW fuel storage basins, Hanford Site, Richland Washington

    International Nuclear Information System (INIS)

    1995-07-01

    The U.S. Department of Energy (DOE) needs to remove irradiated fuel from the Plutonium-Uranium Extraction (PUREX) Plant and N Reactor at the Hanford Site, Richland, Washington, to stabilize the facilities in preparation for decontamination and decommissioning (D ampersand D) and to reduce the cost of maintaining the facilities prior to D ampersand D. DOE is proposing to transfer approximately 3.9 metric tons (4.3 short tons) of unprocessed irradiated fuel, by rail, from the PUREX Plant in the 200 East Area and the 105 N Reactor (N Reactor) fuel storage basin in the 100 N Area, to the 105-KE and 105-KW fuel storage basins (K Basins) in the 100 K Area. The fuel would be placed in storage at the K Basins, along with fuel presently stored, and would be dispositioned in the same manner as the other existing irradiated fuel inventory stored in the K Basins. The fuel transfer to the K Basins would consolidate storage of fuels irradiated at N Reactor and the Single Pass Reactors. Approximately 2.9 metric tons (3.2 short tons) of single-pass production reactor, aluminum clad (AC) irradiated fuel in four fuel baskets have been placed into four overpack buckets and stored in the PUREX Plant canyon storage basin to await shipment. In addition, about 0.5 metric tons (0.6 short tons) of zircaloy clad (ZC) and a few AC irradiated fuel elements have been recovered from the PUREX dissolver cell floors, placed in wet fuel canisters, and stored on the canyon deck. A small quantity of ZC fuel, in the form of fuel fragments and chips, is suspected to be in the sludge at the bottom of N Reactor's fuel storage basin. As part of the required stabilization activities at N Reactor, this sludge would be removed from the basin and any identifiable pieces of fuel elements would be recovered, placed in open canisters, and stored in lead lined casks in the storage basin to await shipment. A maximum of 0.5 metric tons (0.6 short tons) of fuel pieces is expected to be recovered

  6. Solar power plant performance evaluation: simulation and experimental validation

    Science.gov (United States)

    Natsheh, E. M.; Albarbar, A.

    2012-05-01

    In this work the performance of solar power plant is evaluated based on a developed model comprise photovoltaic array, battery storage, controller and converters. The model is implemented using MATLAB/SIMULINK software package. Perturb and observe (P&O) algorithm is used for maximizing the generated power based on maximum power point tracker (MPPT) implementation. The outcome of the developed model are validated and supported by a case study carried out using operational 28.8kW grid-connected solar power plant located in central Manchester. Measurements were taken over 21 month's period; using hourly average irradiance and cell temperature. It was found that system degradation could be clearly monitored by determining the residual (the difference) between the output power predicted by the model and the actual measured power parameters. It was found that the residual exceeded the healthy threshold, 1.7kW, due to heavy snow in Manchester last winter. More important, the developed performance evaluation technique could be adopted to detect any other reasons that may degrade the performance of the P V panels such as shading and dirt. Repeatability and reliability of the developed system performance were validated during this period. Good agreement was achieved between the theoretical simulation and the real time measurement taken the online grid connected solar power plant.

  7. Design and operating experience on the U.S. Department of Energy Experimental Mod-O 100 kW Wind Turbine

    Science.gov (United States)

    Glasgow, J. C.; Birchenough, A. G.

    1978-01-01

    The Mod-O 100 kW Experimental Wind Turbine was designed and fabricated by NASA, as part of the Federal Wind Energy Program, to assess technology requirements and engineering problems of large wind turbines. The machine became operational in October 1975 and has demonstrated successful operation in all of its design modes. During the course of its operations the machine has generated a wealth of experimental data and has served as a prototype developmental test bed for the Mod-OA operational wind turbines which are currently used on utility networks. This paper describes the mechanical and control systems as they evolved in operational tests and describes some of the experience with various systems in the downwind rotor configuration.

  8. Photovoltaic pilot plant of Vulcano (Italy)

    Energy Technology Data Exchange (ETDEWEB)

    Menga, P.; Previ, A.

    1988-12-31

    The rated peak power of the Vulcano plant is about 80 kW. The main feature of the plant lies in its dual operating mode: either stand-alone or grid-connected. The plant, commissioned half-way through 1984, has always worked uninterruptedly and satisfactorily and, for this reason, it is expected to keep on operating in the coming years. Beginning from 1987, it has been considered worth carrying out research on a number of specific points not so far dealt with in sufficient detail in literature, as follows: experimental research on the deterioration, over a period of time, of the characteristics of the modules of the plant; theoretical and experimental research on the plant`s electrochemical storage system. The research on the second of the above subjects has a number of aims: to improve methods of checking the state of charge of batteries in newly-designed photovoltaic plants; to improve the ways in which the Vulcano battery storage system is operated; and to monitor and make a careful diagnosis of the condition of the plant`s battery.

  9. Experiences with drug testing at a nuclear power plant

    International Nuclear Information System (INIS)

    Ray, H.B.

    1987-01-01

    After more than 2 yr of operation of a drug testing program at the San Onofre nuclear power plant site, the Southern California Edison Co. has had a number of experiences and lessons considered valuable. The drug testing program at San Onofre, implemented in September of 1984, continues in essentially the same form today. Prior to describing the program, the paper reviews several underlying issues that believed to be simultaneously satisfied by the program: trustworthiness, fitness and safety, public trust, and privacy and search. The overall drug testing program, periodic drug monitoring program, and unannounced drug testing program are described. In addition to the obvious features of a good drug testing program, which are described in the EEI guide, it is essential to consider such issues as the stated program rationale, employee relations, and disciplinary action measures when contemplating or engaging in drug testing at nuclear power plants

  10. Guidelines for confirmatory inplant tests of safety-relief valve discharges for BWR plants

    International Nuclear Information System (INIS)

    Su, T.M.

    1981-05-01

    Inplant tests of safety/relief valve (SRV) discharges may be required to confirm generically established specifications for SRV loads and the maximum suppression pool temperature, and to evaluate possible effects of plant-unique parameters. These tests are required in those plants which have features that differ substantially from those previously tested. Guidelines for formulating appropriate test matrices, establishing test procedures, selecting necessary instrumentation, and reporting the test results are provided in this report. Guidelines to determine if inplant tests are required on the basis of the plant unique parameters are also included in the report

  11. ZTEK`s ultra-high efficiency fuel cell/gas turbine system for distributed generation

    Energy Technology Data Exchange (ETDEWEB)

    Hsu, M.; Nathanson, D. [Ztek Corp., Waltham, MA (United States); Bradshaw, D.T. [Tennessee Valley Authority, Chattanooga, TN (United States)] [and others

    1996-12-31

    Ztek`s Planar Solid Oxide Fuel Cell (SOFC) system has exceptional potential for utility electric power generation because of: simplicity of components construction, capability for low cost manufacturing, efficient recovery of very high quality by-product heat (up to 1000{degrees}C), and system integration simplicity. Utility applications of the Solid Oxide Fuel Cell are varied and include distributed generation units (sub-MW to 30MW capacity), repowering existing power plants (i.e. 30MW to 100MW), and multi-megawatt central power plants. A TVA/EPRI collaboration program involved functional testing of the advanced solid oxide fuel cell stacks and design scale-up for distributed power generation applications. The emphasis is on the engineering design of the utility modules which will be the building blocks for up to megawatt scale power plants. The program has two distinctive subprograms: Verification test on a 1 kW stack and 25kW module for utility demonstration. A 1 kW Planar SOFC stack was successfully operated for 15,000 hours as of December, 1995. Ztek began work on a 25kW SOFC Power System for TVA, which plans to install the 25kW SOFC at a host site for demonstration in 1997. The 25kW module is Ztek`s intended building block for the commercial use of the Planar SOFC. Systems of up to megawatt capacity can be obtained by packaging the modules in 2-dimensional or 3-dimensional arrays.

  12. High-voltage test stand at Livermore

    International Nuclear Information System (INIS)

    Smith, M.E.

    1977-01-01

    This paper describes the present design and future capability of the high-voltage test stand for neutral-beam sources at Lawrence Livermore Laboratory. The stand's immediate use will be for testing the full-scale sources (120 kV, 65 A) for the Tokamak Fusion Test Reactor. It will then be used to test parts of the sustaining source system (80 kV, 85 A) being designed for the Magnetic Fusion Test Facility. Following that will be an intensive effort to develop beams of up to 200 kV at 20 A by accelerating negative ions. The design of the test stand features a 5-MVA power supply feeding a vacuum tetrode that is used as a switch and regulator. The 500-kW arc supply and the 100-kW filament supply for the neutral-beam source are battery powered, thus eliminating one or two costly isolation transformers

  13. Development and characterization of magnetic HTS bearings for a 400 kW synchronous HTS motor

    International Nuclear Information System (INIS)

    Kummeth, P; Ries, G; Nick, W; Neumueller, H-W

    2004-01-01

    Promising results of static and dynamic investigations on various journal type test bearings encouraged us to develop a scaled-up HTS bearing, able to carry the HTS rotor of a 400 kW superconducting motor. The stator, a YBCO hollow cylinder of 203 mm inner diameter and 250 mm length, is cooled by liquid nitrogen. Permanent magnet rings with a diameter of 200 mm were mounted on a shaft with alternating polarity. Characterization of the bearing capacity was performed with three different YBCO stators at temperatures between 66 and 86 K in a test set-up. A significant influence of the temperature was found. At a stator temperature of 72 K and a rotation frequency of 25 Hz (corresponding to nominal motor speed) a radial bearing force of 2700 N was measured for the shaft at centre position. Under rotation of the shaft the bearing capacity is reduced. At present our results range within the highest radial bearing capacities reported world-wide

  14. Operating experience and reliability improvements on the 5 kW CW klystron at Jefferson Lab

    International Nuclear Information System (INIS)

    Nelson, R.; Holben, S.

    1997-01-01

    With substantial operating hours on the RF system, considerable information on reliability of the 5 kW CW klystrons has been obtained. High early failure rates led to examination of the operating conditions and failure modes. Internal ceramic contamination caused premature failure of gun potting material and ultimate tube demise through arcing or ceramic fracture. A planned course of reporting and reconditioning of approximately 300 klystrons, plus careful attention to operating conditions and periodic analysis of operational data, has substantially reduced the failure rate. It is anticipated that implementation of planned supplemental monitoring systems for the klystrons will allow most catastrophic failures to be avoided. By predicting end of life, tubes can be changed out before they fail, thus minimizing unplanned downtime. Initial tests have also been conducted on this same klystron operated at higher voltages with resultant higher output power. The outcome of these tests will provide information to be considered for future upgrades to the accelerator

  15. Numerical investigation into premixed hydrogen combustion within two-stage porous media burner of 1 kW solid oxide fuel cell system

    Energy Technology Data Exchange (ETDEWEB)

    Yen Tzu-Hsiang; Chen Bao-Dong [Refining and Manufacturing Research Institute, CPC Corporation, Chia-Yi City 60036, Taiwan (China); Hong Wen-Tang; Tsai Yu-Ching; Wang Hung-Yu; Huang Cheng-Nan; Lee Chien-Hsiung [Institute of Nuclear Energy Research Atomic Energy Council, Taoyuan County 32546, Taiwan (China)

    2010-07-01

    Numerical simulations are performed to analyze the combustion of the anode off-gas / cathode off-gas mixture within the two-stage porous media burner of a 1 kW solid oxide fuel cell (SOFC) system. In performing the simulations, the anode gas is assumed to be hydrogen and the combustion of the gas mixture is modeled using a turbulent flow model. The validity of the numerical model is confirmed by comparing the simulation results for the flame barrier temperature and the porous media temperature with the corresponding experimental results. Simulations are then performed to investigate the effects of the hydrogen content and the burner geometry on the temperature distribution within the burner and the corresponding operational range. It is shown that the maximum flame temperature increases with an increasing hydrogen content. In addition, it is found that the burner has an operational range of 1.2--6.5 kW when assigned its default geometry settings (i.e. a length and diameter of 0.17 m and 0.06 m, respectively), but increases to 2--9 kW and 2.6--11.5 kW when the length and diameter are increased by a factor of 1.5, respectively. Finally, the operational range increases to 3.5--16.5 kW when both the diameter and the length of the burner are increased by a factor of 1.5.

  16. Thermodynamic analysis of a low-temperature organic Rankine cycle power plant operating at off-design conditions

    International Nuclear Information System (INIS)

    He, Zhonglu; Zhang, Yufeng; Dong, Shengming; Ma, Hongting; Yu, Xiaohui; Zhang, Yan; Ma, Xuelian; Deng, Na; Sheng, Ying

    2017-01-01

    Highlights: • An ORC power plant driven by low grade heat source is set up. • Energy and exergy analysis at off-design conditions is conducted. • The twin screw expander performance is characterized. • An empirical model to predict the net power output and thermal efficiency. - Abstract: This paper deals with an experimental study on a 50-kW Organic Rankine cycle (ORC) power generation plant driven by low-grade heat source. Hot water boiler and solar-thermal system were used as the low-grade heat source providing hot water at temperature ranging from 65 to 95 °C. A twin screw compressor has been modified as the expansion machine in the ORC module and its expansion efficiency under variable operating conditions was tested in the experiments. This work was purposed to assess the ORC system and get the performance map at off-design operating conditions in a typical year from the view of the first and the second law of thermodynamics. The maximum electricity production and thermal efficiency were 46.5 kW and 6.52% respectively at the optimal operating condition. The highest exergetic efficiency reached 36.3% and the exergy analysis showed that evaporation pressure and condensation pressure were the key parameters to influence the exergy flow and exergetic efficiency. Furthermore, by fitting the actual plant data obtained in different months, an empirical model has been developed to predict the net power output and thermal efficiency with acceptable accuracy. Lastly, as an illustration, the empirical model is used to analyze the performance of the solar-driven ORC system.

  17. Pyrolysis of rubber gloves in integral pyrolysis test plant

    International Nuclear Information System (INIS)

    Norasalwa Zakaria; Mohd Noor Muhd Yunus; Mohd Annuar Assadat Husain; Farid Nasir Ani

    2010-01-01

    Previously, pyrolysis of rubber gloves in laboratory study was described. In order to visualize the practical application of rubber gloves pyrolysis in terms of treating rubber gloves in medical waste, a new test plant was designed and constructed. The semi-continuous test plant was designed to accommodate rubber gloves that were not cut or shredded. The test plant has a capacity of 2kg/ hr and employed auxiliary fuel instead of the conventional electrical power for heating. The concept was based on moving bed reactor, but additional feature of sand jacket feature was also introduced in the design. Pyrolysis of the gloves was conducted at three temperatures, namely 350 degree Celsius, 400 degree Celsius and 450 degree Celsius. Oxygen presents inside of the reactor due to the combined effect of imperfect sealing and suction effect. This study addresses the performance of this test plant covering the time temperature profile, gas evolution profile and product yield. Comparison between the yield of the liquid, gas and char pyrolyzate was made against the laboratory study. It was found that the oil yield was less than the one obtained from bench scale study. Water formation was more pronounced. The presence of the oxygen also altered the tail gas composition but eliminate the sticky nature of solid residue, making it easier to handle. The chemical composition of the oil was determined and the main compounds in the oil were esters and phtalic acid. (author)

  18. High power pulsed/microwave technologies for electron accelerators vis a vis 10MeV, 10kW electron LINAC for food irradiation at CAT

    International Nuclear Information System (INIS)

    Shrivastava, Purushottam; Mulchandani, J.; Mohania, P.; Baxy, D.; Wanmode, Y.; Hannurkar, P.R.

    2005-01-01

    Use of electron accelerators for irradiation of food items is gathering momentum in India. The various technologies for powering the electron LINAC were needed to be developed in the country due to embargo situations as well as reservations of the developers worldwide to share the information related to this development. Centre for Advanced Technology, CAT, Indore, is engaged in the development of particle accelerators for medical industrial and scientific applications. Amongst other electron accelerators developed in CAT, a 10MeV, 10kW LINAC for irradiation of food items has been commissioned and tested for full rated 10kW beam power. The high power pulsed microwave driver for the LINAC was designed, developed and commissioned with full indigenous efforts, and is right now operational at CAT. It consists of a 6MW, 25kW S-band pulsed klystron, 15MW peak power pulse modulator system for the klystron, microwave driver amplifier chain, stabilized generator, protection and control electronics, waveguide system to handle the high peak and average power, gun modulator electronics, grid electronics etc. The present paper highlights various technologies like the pulsed power systems and components, microwave circuits and systems etc. Also the performance results of the high power microwave driver for the 10MeV LINAC at CAT are discussed. Future strategies for developing the state of art technologies are highlighted. (author)

  19. Field vibration test of principal equipment of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Shiraki, Kazuhiro; Fujita, Katsuhisa; Kajimura, Motohiko; Ikegami, Yasuhiko; Hanzawa, Katsumi; Sakai, Yoshiyuki; Kokubo, Eiji; Igarashi, Shigeru

    1984-09-01

    Japan is one of the most earthquake-stricken countries in the world, and demands for aseismic design have become severer recently. In a nuclear power plant in particular, consisting of a reactor vessel and other facilities dealing with a radioactive substance in some form or other, it is essential from the standpoint of safety to eliminate any possibility of radioactive hazards for the local public, and the employees at the plant as well, if these facilities are struck by an earthquake. This paper is related to the reactor vessel, reactor primary cooling equipment and piping system and important general piping as examples of important facilities of a nuclear power plant, and discusses vibration tests of an actual plant in the field from the standpoint of enhancing the aseismic safety of the Mitsubishi PWR nuclear power plant. Especially concerning vibration test technology, the effects in the evaluation of aseismic safety and its limits are studied to prove how it contributes to the enhancement of the reliability of aseismic design of nuclear power plants.

  20. Performance test for the compressor of 100kW APU

    International Nuclear Information System (INIS)

    Lim, Byeung Jun; Cha, Bong Jun; Yang, Soo Seok; Lee, Kyoung Jin; Baik, Ki Young

    2001-01-01

    The performance test of a centrifugal compressor for APU(Auxiliary Power Unit) which is developed by the collaborative research of KARI and Samsung TechWin has been conducted. The investigated compressor consists of a curved inlet, a centrifugal impeller, a channel diffuser and a plenum chamber. The experiments were carried out in an open-loop centrifugal compressor test rig driven by a turbine. For three different diffusers, overall performance data were obtained at 80%, 90% and 97% of design speed. For the initially designed wedge-type diffuser, test results showed that the compressor was operated at a higher mass flow rate than the design requirement. By reducing the diffuser throat area, the compressor operating range was shifted to lower mass flow rate range. The test result of redesigned wedge-type diffuser showed high pressure loss. To reduce the diffuser loss, diffuser inlet radius was increased and airfoil-type of diffuser was adopted. This airfoil-type diffuser showed reasonal results in terms of design requirement

  1. Design experiences of the first solar parabolic thermal power plant for various regions in Iran

    International Nuclear Information System (INIS)

    Azizian, K.; Yaghoubi, M.; Kenary, A.

    2002-01-01

    The basic design is made for a 250 kw solar power plant. The main element of the plant is the collectors. Base on system simulation, a parabolic collector constructed and tested for one year. The model is first validated with experimental measurement and a detail numerical model is also developed to study effects of various optical properties of mirrors and receiver on the thermal performance of the collectors. It is observed that due to poor optical properties of the present collector, it would not be able to produce hot oil with desired temperature. Improving the material of the mirrors and the receiver tube, thermal performances exceed substantially from the design conditions. By considering available optical properties simulation is made to estimate yearly steady and unsteady behavior and the performance of the power plant for three locations: Shiraz, Yazd and Lar in Iran. Comparison of the yearly performance of the cycle shows that unsteady behavior reveals different results and simulations approach a reliable technique to study such cycle

  2. 78 FR 25488 - Qualification Tests for Safety-Related Actuators in Nuclear Power Plants

    Science.gov (United States)

    2013-05-01

    ... Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide; request for... regulatory guide (DG), DG-1235, ``Qualification Tests for Safety-Related Actuators in Nuclear Power Plants... entitled ``Qualification Tests for Safety-Related Actuators in Nuclear Power Plants'' is temporarily...

  3. Pilot plant UF6 to UF4 test operations report

    International Nuclear Information System (INIS)

    Bicha, W.J.; Fallings, M.; Gilbert, D.D.; Koch, G.E.; Levine, P.J.; McLaughlin, D.F.; Nuhfer, K.R.; Reese, J.C.

    1987-02-01

    The FMPC site includes a plant designed for the reduction of uranium hexafluoride (UF 6 ) to uranium tetrafluoride (UF 4 ). Limited operation of the upgraded reduction facility began in August 1984 and continued through January 19, 1986. A reaction vessel ruptured on that date causing the plant operation to be shut down. The DOE conducted a Class B investigation with the findings of the investigation board issued in preliminary form in May 1986 and as a final recommendation in July 1986. A two-phase restart of the plant was planned and implemented. Phase I included implementing safety system modifications, changing reaction vessel temperature control strategy, and operating the reduction plant under an 8-week controlled test. The results of the test period are the subject of this report. 41 figs., 11 tabs

  4. FY 1994 report on the development of wood-waste/agri-waste pyrolytic gasification technology and utilization technology of gas product; 1994 nendo mokushitsukei haikibutsu no netsubunkai gas ka gijutsu to seisei gas no riyo gijutsu kaihatsu hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This 5-year joint project (FY 1990 to 1994) by Japan and the Philippines is aimed at joint research and development of (thermal decomposition/gasification and power generation system) for transforming large quantities of wood-wastes/agri-wastes left unutilized in the Philippines into electric power, in which thermal decomposition/gasification of the wastes is combined with a gas engine system. The field tests of the demonstration plant successfully produce power of 100 kW by burning only the low-calorie gas with a heating value near critical level for self-sustained combustion, obtained by gasification of sawdust by the fluidized gasifier and refined, attaining the object of the project. It is confirmed that a 200 to 300 kW class commercial plant can be designed and constructed basically by scaling up the 100 kW demonstration plant. The other data obtained by the field tests include those for improved operability and maintainability, gas purification, and reducing sizes of the facilities, including utility facilities. (NEDO)

  5. A 200kW central receiver CPV system

    Energy Technology Data Exchange (ETDEWEB)

    Lasich, John, E-mail: jbl@raygen.com; Thomas, Ian, E-mail: ithomas@raygen.com; Hertaeg, Wolfgang; Shirley, David; Faragher, Neil; Erenstrom, Neil; Carter, Sam; Cox, Brian; Zuo, Xinyi [Raygen Resources Pty. Ltd., 15 King Street, Blackburn, Victoria, 3130 (Australia)

    2015-09-28

    Raygen Resources has recently completed a Central Receiver CPV (CSPV) pilot plant in Central Victoria, Australia. The system is under final commissioning and initial operation is expected in late April 2015. The pilot demonstrates a full scale CSPV repeatable unit in a form that is representative of a commercial product and provides a test bed to prove out performance and reliability of the CSPV technology. Extensive testing of the system key components: dense array module, wireless solar powered heliostat and control system has been performed in the laboratory and on sun. Results from this key component testing are presented herein.

  6. Development of CH{sub 3}OH fueled PEMFC power plants for hybrid transit buses

    Energy Technology Data Exchange (ETDEWEB)

    Baumert, R; Cooper, R; Feasey, G [DBB Fuel Cell Engines Corp., Poway, CA (United States)

    1999-12-31

    An overview of the methanol fuel cell power system was provided, identifying improved efficiency and reduced emissions as the principal advantages. Four critical tasks regarding on-board fuel processing were described: (1) efficient methanol conversion (steam reforming), (2) effective reformate purification (selective catalytic oxidation), (3) optimized heat integration, and (4) rapid response to transients. A description of a 100 kW PEM fuel cell bus engine package was also presented. As far as a development time table is concerned, the DBB Fuel Cell Engines Corp. of Poway California has completed two methanol fueled PEMFC power plants, fabrication of the initial 100 kW PEMFC engine is in progress and scheduled for delivery by 1998. The two methanol fueled commercial products which are in the planning stages are the 100 and 200 kW class FCPS for hybrid and non-hybrid buses and other applications. tabs., figs.

  7. Plant Atrium System for Food Production in NASA's Deep Space Habitat Tests

    Science.gov (United States)

    Massa, Gioia D.; Simpson, Morgan; Wheeler, Raymond M.; Newsham, Gerald; Stutte, Gary W.

    2013-01-01

    In preparation for future human exploration missions to space, NASA evaluates habitat concepts to assess integration issues, power requirements, crew operations, technology, and system performance. The concept of a Food Production System utilizes fresh foods, such as vegetables and small fruits, harvested on a continuous basis, to improve the crew's diet and quality of life. The system would need to fit conveniently into the habitat and not interfere with other components or operations. To test this concept, a plant growing "atrium" was designed to surround the lift between the lower and upper modules of the Deep Space Habitat and deployed at NASA Desert Research and Technology Studies (DRATS) test site in 2011 and at NASA Johnson Space Center in 2012. With this approach, no-utilized volume provided an area for vegetable growth. For the 2011 test, mizuna, lettuce, basil, radish and sweetpotato plants were grown in trays using commercially available red I blue LED light fixtures. Seedlings were transplanted into the atrium and cared for by the. crew. Plants were then harvested two weeks later following completion of the test. In 2012, mizuna, lettuce, and radish plants were grown similarly but under flat panel banks of white LEDs. In 2012, the crew went through plant harvesting, including sanitizing tlie leafy greens and radishes, which were then consumed. Each test demonstrated successful production of vegetables within a functional hab module. The round red I blue LEDs for the 2011 test lighting cast a purple light in the hab, and were less uniformly distributed over the plant trays. The white LED panels provided broad spectrum light with more uniform distribution. Post-test questionnaires showed that the crew enjoyed tending and consuming the plants and that the white LED light in 2012 provided welcome extra light for the main HAB AREA.

  8. Micro-scale energy valorization of grape marcs in winery production plants

    Energy Technology Data Exchange (ETDEWEB)

    Fabbri, Andrea; Bonifazi, Giuseppe; Serranti, Silvia, E-mail: silvia.serranti@uniroma1.it

    2015-02-15

    Highlights: • BioMethane Potential of grape marcs was investigated. • Grape marcs were characterized to realize a micro-scale energy recovery. • Comparative BMP batch-tests utilizing lab-scale reactors were performed. • Biogas valorization by grape marcs anaerobic digestion at small scale is evaluated. - Abstract: The BiochemicalMethanePotential (BMP) of winery organic waste, with reference to two Italian red and white grapes (i.e. Nero Buono and Greco) by-products was investigated. The study was carried out to verify the possibility to reduce the production impact in a green-waste-management-chain-perspective. The possibility to efficiently utilize wine-related-by-products for energy production at a micro-scale (i.e. small-medium scale winery production plant) was also verified. Results showed as a good correlation can be established between the percentage of COD removal and the biogas production, as the winery can produce, from its waste methanization, about 7800 kW h year{sup −1} electrical and 8900 kW h year{sup −1} thermal. A critical evaluation was performed about the possibility to utilize the proposed approach to realize an optimal biomass waste management and an energetic valorization in a local-energy-production-perspective.

  9. Experimental Investigations from the Operation of a 2 Kw Brayton Power Conversion Unit and a Xenon Ion Thruster

    Science.gov (United States)

    Mason, Lee; Birchenough, Arthur; Pinero, Luis

    2004-01-01

    A 2 kW Brayton Power Conversion Unit (PCU) and a xenon ion thruster were integrated with a Power Management and Distribution (PMAD) system as part of a Nuclear Electric Propulsion (NEP) Testbed at NASA's Glenn Research Center. Brayton converters and ion thrusters are potential candidates for use on future high power NEP missions such as the proposed Jupiter Icy Moons Orbiter (JIMO). The use of existing lower power test hardware provided a cost-effective means to investigate the critical electrical interface between the power conversion system and ion propulsion system. The testing successfully demonstrated compatible electrical operations between the converter and the thruster, including end-to-end electric power throughput, high efficiency AC to DC conversion, and thruster recycle fault protection. The details of this demonstration are reported herein.

  10. Harmattan gas plant compressor conversion

    Energy Technology Data Exchange (ETDEWEB)

    Temple, K. [Altagas Ltd., Calgary, AB (Canada)

    2009-07-01

    The Harmattan Gas Plant located near the town of Didsbury, Alberta has typical processing units such as amine treating, sulfur recovery, refrigeration, and dehydration. In 1999, a deep cut turbo expander train was added for the extraction of ethane and in 2003 a spec carbon dioxide unit was added. Since its construction in 1961, the plant has undergone many modifications. As such, the plant is a mix of new and old equipment. A 3500 kW Solar Centaur 50LS gas turbine compressor with waste heat recovery was installed at the plant in 2008. This paper reviewed the project from concept to execution and demonstrated how reciprocating compressors were economically replaced with a gas turbine. Altagas had an incentive to invest in the project to lower operating and maintenance costs. Altagas was able to economically replace aging reciprocating compressors with a single turbine driving a centrifugal compressor without any producer subsidies or contract revisions. 2 tabs., 5 figs.

  11. Dynamic testing of nuclear power plant structures: an evaluation

    International Nuclear Information System (INIS)

    Weaver, H.J.

    1980-02-01

    Lawrence Livermore Laboratory (LLL) evaluated the applications of system identification techniques to the dynamic testing of nuclear power plant structures and subsystems. These experimental techniques involve exciting a structure and measuring, digitizing, and processing the time-history motions that result. The data can be compared to parameters calculated using finite element or other models of the test systems to validate the model and to verify the seismic analysis. This report summarizes work in three main areas: (1) analytical qualification of a set of computer programs developed at LLL to extract model parameters from the time histories; (2) examination of the feasibility of safely exciting nuclear power plant structures and accurately recording the resulting time-history motions; (3) study of how the model parameters that are extracted from the data be used best to evaluate structural integrity and analyze nuclear power plants

  12. Possibilities of avoidance and control of bacterial plant diseases when using pathogen-tested (certified) or - treated planting material

    NARCIS (Netherlands)

    Janse, J.; Wenneker, M.

    2002-01-01

    Testing of planting material for freedom from phytopathogenic bacteria is an important, although not exclusive, method for control of bacterial diseases of plants. Ideally, pathogen-free or pathogen-/disease-resistant planting material is desirable, but this situation is not always possible on a

  13. Radioactive Air Emissions Notice of Construction for the 105-KW Basin integrated water treatment system filter vessel sparging vent

    Energy Technology Data Exchange (ETDEWEB)

    Kamberg, L.D.

    1998-02-23

    This document serves as a notice of construction (NOC), pursuant to the requirements of Washington Administrative Code (WAC) 246-247-060, and as a request for approval to construct, pursuant to 40 Code of Federal Regulations (CFR) 61.07, for the Integrated Water Treatment System (IWTS) Filter Vessel Sparging Vent at 105-KW Basin. Additionally, the following description, and references are provided as the notices of startup, pursuant to 40 CFR 61.09(a)(1) and (2) in accordance with Title 40 Code of Federal Regulations, Part 61, National Emission Standards for Hazardous Air Pollutants. The 105-K West Reactor and its associated spent nuclear fuel (SNF) storage basin were constructed in the early 1950s and are located on the Hanford Site in the 100-K Area about 1,400 feet from the Columbia River. The 105-KW Basin contains 964 Metric Tons of SNF stored under water in approximately 3,800 closed canisters. This SNF has been stored for varying periods of time ranging from 8 to 17 years. The 105-KW Basin is constructed of concrete with an epoxy coating and contains approximately 1.3 million gallons of water with an asphaltic membrane beneath the pool. The IWTS, which has been described in the Radioactive Air Emissions NOC for Fuel Removal for 105-KW Basin (DOE/RL-97-28 and page changes per US Department of Energy, Richland Operations Office letter 97-EAP-814) will be used to remove radionuclides from the basin water during fuel removal operations. The purpose of the modification described herein is to provide operational flexibility for the IWTS at the 105-KW basin. The proposed modification is scheduled to begin in calendar year 1998.

  14. Demonstration test of in-service inspection methods

    International Nuclear Information System (INIS)

    Takumi, Kenji

    1987-01-01

    The major objectives of the project are: (1) to demonstrate the reliability of a manual ultrasonic flaw detector and techniques that are used in operating light water reactor plants and (2) to demonstrate the performance and reliability of an automatic ultrasonic flaw detector that is designed to shorten the time required for ISI work and reduce the exposure risk of inspection personnel. The test project consists of three stages. In the first stage, which ended in 1982, defects were added intentionally to a model structure the same in size as a typical 1.1 million kW BWR plant and manual ultrasonic flaw detection tensting was performed. In the second stage, completed in 1984, automatic eddy-current flaw detection testing was carried out for defects in heat transfer piping of a PWP steam generator. In the third stage, which started in 1981 and ended in March 1987, a newly developed automatic ultrasonic flaw detector is applied to testing of defects used for the manual detector performance evaluation. Results have shown that the automatic eddy-current flaw detector under test has an adequately stable performance for practical uses, with a very high reproducibility to permit close inspection of secular deterioration in heat transfer pipes. It has also revealed that both the manual and automatic ultrasonic flaw detectors under test can detect all defects that do not comply with the ASME standards. (Nogami, K.)

  15. Survey of the small (300 W to 300 kW) wind turbine market in Canada

    International Nuclear Information System (INIS)

    2005-01-01

    The significant growth in the Canadian wind power industry over the past decade has resulted in an increased number of large utility-scale wind farms appearing across Canada. Although large wind turbines are often acknowledged as a mature technology that can provide clean, reliable and economically competitive power, smaller wind turbines have had relatively little documentation in comparison. The aim of this report was to provide a profile of the Canadian market for small wind turbines (SWTs), divided into 3 categories: mini wind turbines with a rated power output from 300 watts to 1000 watts; small wind turbines up to 30 kW; and medium-sized wind turbines up to 300 kW. Study findings were based on interviews with industry experts and a comprehensive survey of 135 companies involved in the Canadian SWT industry. Details of annual sales and total installed capacity were provided, as well as a summary of key SWT markets. An overview of Canadian market demand and international SWT manufacturing capacity was presented. Opportunities and barriers were examined. It was observed that experiences in the United States have indicated that SWTs are more successful when combined with enabling policies, market incentives, and education and awareness raising. The U.S. small wind industry has estimated that in the near future, the SWT industry could supply 50,000 MW, employ 10,000 people and generate $1 billion per year. A number of opportunities for the promotion of the small wind industry in Canada were reviewed, including the niche manufacturing sector in the 20 kW to 50 kW range. Issues concerning the economic benefits of a SWT manufacturing industry were examined. It was suggested that as the SWT markets grow and mature, turbine prices are expected to fall and turbine effectiveness and reliability will increase. An SWT promotional strategy was outlined with incentives in 4 areas: (1) market development; (2) policy development; (3) technology development; and (4) education

  16. Prototype of an electric 'integral-ecomotor' for the power range up to 1 kW; Funktionsmuster eines Integral-Sparmotors im Leistungsbereich kleiner 1 kW

    Energy Technology Data Exchange (ETDEWEB)

    Lindegger, M.

    2006-11-15

    Numerous electric motors of our daily use, with power ratings of about 1 kW operate at rather low efficiencies. Their share in the overall electric consumption is considerable. The aim of the research project consisted in the development of an efficient electric motor with incorporated electronic control ('integral-ecomotor'), which may serve as a substitute for usual variable speed squirrel cage three-phase motor. It was shown that the cost of these new motors of 1 kW power output, built with normalised casings, remain similar to those of squirrel cage three phase motors with inverters. Since 2004, the cost of raw materials as copper or aluminium increased considerably, whereas the cost of Neodymium-Iron-Boron magnets remained rather stable. These facts advocate for energy saving motors making use of permanent magnets, requiring much less copper or aluminium than squirrel cage three phase motors. With integral ecomotors, higher efficiencies are achieved at lower masses as compared to usual squirrel cage three-phase motors. In 2004, a first prototype of this ecomotor using permanent magnets, was built. The advantages of improved performances at lower weight were confirmed. During 2005 and 2006, the technology was then improved and matured in a joint research project with 3 industrial partners. (author)

  17. Consideration concerning the costs of the 300 kW wind units developed in Romania

    International Nuclear Information System (INIS)

    Gyulai, F.; Bej, A.

    1995-01-01

    A demonstrative wind farm with four research units, 300 kW each, is in developing stage in Romania. The article shows economic analysis of these experimental wind units and their cost structure focusing in component costs, performance, manufacturing technology and installing work. (author)

  18. Consideration concerning the costs of the 300 kW wind units developed in Romania

    Energy Technology Data Exchange (ETDEWEB)

    Gyulai, F; Bej, A [Technical Univ. of Timisoara (Romania). Wind Energy Research Center

    1996-12-31

    A demonstrative wind farm with four research units, 300 kW each, is in developing stage in Romania. The article shows economic analysis of these experimental wind units and their cost structure focusing in component costs, performance, manufacturing technology and installing work. (author)

  19. Consideration concerning the costs of the 300 kW wind units developed in Romania

    Energy Technology Data Exchange (ETDEWEB)

    Gyulai, F.; Bej, A. [Technical Univ. of Timisoara (Romania). Wind Energy Research Center

    1995-12-31

    A demonstrative wind farm with four research units, 300 kW each, is in developing stage in Romania. The article shows economic analysis of these experimental wind units and their cost structure focusing in component costs, performance, manufacturing technology and installing work. (author)

  20. Carbon fiber reinforced materials - glass fiber reinforced materials

    Energy Technology Data Exchange (ETDEWEB)

    Krautwald, R

    1980-10-01

    Wind power plants are promising alternative energy systems. The rotor blades are subject to high demands: Long life, light weight, and high stiffness. A GFRP/CFRP combination was chosen for a 316 kW plant, the composite construction is by far superior to the metal construction. Design, fabrication, and testing are described. The plant has a power of 316 kW for a wind velocity of 8.5 m/sec, a rotational speed of 37 min/sup -1/, a rotor diameter of 52 m with a blade length of 25.2 m and a blade mass of 1 t. An experimental component 10.2 m long was constructed and tested with satisfactory results.

  1. Solar power plant performance evaluation: simulation and experimental validation

    International Nuclear Information System (INIS)

    Natsheh, E M; Albarbar, A

    2012-01-01

    In this work the performance of solar power plant is evaluated based on a developed model comprise photovoltaic array, battery storage, controller and converters. The model is implemented using MATLAB/SIMULINK software package. Perturb and observe (P and O) algorithm is used for maximizing the generated power based on maximum power point tracker (MPPT) implementation. The outcome of the developed model are validated and supported by a case study carried out using operational 28.8kW grid-connected solar power plant located in central Manchester. Measurements were taken over 21 month's period; using hourly average irradiance and cell temperature. It was found that system degradation could be clearly monitored by determining the residual (the difference) between the output power predicted by the model and the actual measured power parameters. It was found that the residual exceeded the healthy threshold, 1.7kW, due to heavy snow in Manchester last winter. More important, the developed performance evaluation technique could be adopted to detect any other reasons that may degrade the performance of the P V panels such as shading and dirt. Repeatability and reliability of the developed system performance were validated during this period. Good agreement was achieved between the theoretical simulation and the real time measurement taken the online grid connected solar power plant.

  2. MOD-0A 200 kW wind turbine generator design and analysis report

    Science.gov (United States)

    Anderson, T. S.; Bodenschatz, C. A.; Eggers, A. G.; Hughes, P. S.; Lampe, R. F.; Lipner, M. H.; Schornhorst, J. R.

    1980-01-01

    The design, analysis, and initial performance of the MOD-OA 200 kW wind turbine generator at Clayton, NM is documented. The MOD-OA was designed and built to obtain operation and performance data and experience in utility environments. The project requirements, approach, system description, design requirements, design, analysis, system tests, installation, safety considerations, failure modes and effects analysis, data acquisition, and initial performance for the wind turbine are discussed. The design and analysis of the rotor, drive train, nacelle equipment, yaw drive mechanism and brake, tower, foundation, electricl system, and control systems are presented. The rotor includes the blades, hub, and pitch change mechanism. The drive train includes the low speed shaft, speed increaser, high speed shaft, and rotor brake. The electrical system includes the generator, switchgear, transformer, and utility connection. The control systems are the blade pitch, yaw, and generator control, and the safety system. Manual, automatic, and remote control are discussed. Systems analyses on dynamic loads and fatigue are presented.

  3. Cryogenic systems for the Mirror Fusion Test Facility

    International Nuclear Information System (INIS)

    Slack, D.S.; Nelson, R.L.; Chronis, W.C.

    1985-08-01

    This paper includes an in-depth discussion of the design, fabrication, and operation of the Mirror Fusion Test Facility (MFTF) cryogenic system located at Lawrence Livermore National Laboratory (LLNL). Each subsystem discussed to present a basic composite of the entire facility. The following subsystems are included: 500kW nitrogen reliquefier, subcoolers, and distribution system; 15kW helium refrigerator/liquefier and distribution system; helium recovery and storage system; rough vacuum and high vacuum systems

  4. Design of a New Water Load for S-band 750 kW Continuous Wave High Power Klystron Used in EAST Tokamak

    Science.gov (United States)

    Liu, Liang; Liu, Fukun; Shan, Jiafang; Kuang, Guangli

    2007-04-01

    In order to test the klystrons operated at a frequency of 3.7 GHz in a continuous wave (CW) mode, a type of water load to absorb its power up to 750 kW is presented. The distilled water sealed with an RF ceramic window is used as the absorbent. At a frequency range of 70 MHz, the VSWR (Voltage Standing Wave Ratio) is below 1.2, and the rise in temperature of water is about 30 oC at the highest power level.

  5. ETV/COMBINED HEAT AND POWER AT A COMMERCIAL SUPERMARKET CAPSTONE 60 KW MICROTURBINE SYSTEM

    Science.gov (United States)

    The Environmental Technology Verification report discusses the technology and performance of the Capstone 60 Microturbine CHP System manufactured by Capstone Microturbine Corporation. This system is a 60 kW electrical generator that puts out 480 v AC at 60 Hz and that is driven b...

  6. Reaction-to-Fire of Wood Products and Other Building Materials: Part 1, Room/Corner Test Performance

    Science.gov (United States)

    Ondrej Grexa; Mark A. Dietenberger; Robert H. White

    2012-01-01

    This project researched the assessment of reaction-to-fire of common materials using the full-scale room/corner test (ISO 9705) protocol and the predictions of time to flashover using results from the bench-scale cone calorimeter test (ISO 5660-1). Using a burner protocol of 100 kW for 10 min, followed by 300 kW for 10 min and the test materials on the walls only, we...

  7. Progress and prospects for phosphoric acid fuel cell power plants

    Energy Technology Data Exchange (ETDEWEB)

    Bonville, L.J.; Scheffler, G.W.; Smith, M.J. [International Fuel Cells Corp., South Windsor, CT (United States)

    1996-12-31

    International Fuel Cells (IFC) has developed the fuel cell power plant as a new, on-site power generation source. IFC`s commercial fuel cell product is the 200-kW PC25{trademark} power plant. To date over 100 PC25 units have been manufactured. Fleet operating time is in excess of one million hours. Individual units of the initial power plant model, the PC25 A, have operated for more than 30,000 hours. The first model {open_quotes}C{close_quotes} power plant has over 10,000 hours of operation. The manufacturing, application and operation of this power plant fleet has established a firm base for design and technology development in terms of a clear understanding of the requirements for power plant reliability and durability. This fleet provides the benchmark against which power plant improvements must be measured.

  8. Quality assurance and non-destructive testing for nuclear power plants

    International Nuclear Information System (INIS)

    Manlucu, F.A.

    1991-01-01

    This article discussed the quality assurance requirements which have been extensively applied in plant design, fabrication, construction and operation and has played a major role in the excellent safety record of nuclear power plants. The application of non-destructive testing techniques, plays a very important role during the in-service inspection (ISI) in order to prevent dangerous accident and to assure continuous safe operation of nuclear power plants. (IMA). 12 refs

  9. Testing of a Predictive Control Strategy for Balancing Renewable Sources in a Microgrid

    DEFF Research Database (Denmark)

    Marinelli, Mattia; Sossan, Fabrizio; Costanzo, Giuseppe Tommaso

    2014-01-01

    This paper presents the design of a control strategy for the energy management of a grid-connected microgrid with local distributed energy resources as: 10-kW photovoltaic plant, 11-kW wind turbine, and 15-kW–190-kWh vanadium-based electric storage system. According to future regulations......, the renewable energy producers will also have to provide a day-ahead hourly production plan. The overall idea is, by knowing the meteorological forecasts for the next 24 h, to dispatch the microgrid in order to be able to grant the scheduled hourly production by means of proper management of the storage system...

  10. High Falls Hydroelectric Plant feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Diezemann, Gustav A.

    1979-07-01

    This study was made in order to determine if re-activating the retired High Falls Hydro Station in New York would result in a more economical generation of some of the power required in the Central Hudson System than is being obtained with the oil-burning thermal plants. The findings show that the construction of a new plant is more economical than rehabilitation of the existing station. All new construction schemes are marginally unattractive at today's costs but are found to become profitable within a short period as alternative energy sources escalate in price. A new powerhouse with an installed capacity of 2390 kW proved most economical, and its construction is recommended.

  11. Report on results for fiscal 1997 on development of superconducting electric power application technology. Pt. 1. R and D of superconducting wire, R and D of superconducting generator, studies on total system, R and D of refrigeration system, and verification test; 1997 nendo chodendo denryoku oyo gijutsu kaihatsu seika hokokusho. 1. Chodendo senzai no kenkyu kaihatsu, chodendo hatsudenki no kenkyu kaihatsu, total system no kenkyu, reito system no kenkyu kaihatsu, jissho shiken

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    This report explains the outline as Part 1. In fiscal 1997, the 10th year of the project, a multi cylindrical rotary model for which an in-situ verification test was finished was brought back to the plant and dismantled for examination, while the in-situ verification test of a slow-response type model machine rotor was conducted in combination with a refrigeration system. In addition, in the research of AC wire materials and oxide based materials, studies were made with a purpose of high characterization and long wire materialization. In the metallic materials, a 10kANbTi conductor was developed while, in oxide-based materials, research was done on performance improvement and wire materialization based on various synthesizing methods. The manufacturing, factory test and in-situ text were conducted for a 70,000kW model machine with the purpose of R and D of a 200,000kW class pilot machine. Examination was made on the test method of the 70,000kW class model machine, operation technology of a superconducting generation system, and the effect of introducing the superconducting generator into a power system. In the conventional refrigeration system, a single unit test was carried out for the liquefaction, liquid storing capacity, etc., of the system. The 70,000kW class model machine was put through a test for confirming the general operation including the refrigeration system. (NEDO)

  12. Qualification tests for shift personnel in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Fechner, J B [Bundesministerium des Innern, Bonn (Germany, F.R.)

    1978-02-01

    The selection of personnel for training as shift supervisors or reactor operators so far used to be made by a plant operator mainly on the basis of such criteria as examinations, diplomas and other documents verifying the educational background, the type of activity exercised, and professional success. In addition, there are the opininons of trainers and supervisors based on personal observation of future shift personnel on training for specific plants at a training center, at the manufacturer's, the operator's or in activities in the construction and commissioning of the respective nuclear power plant. In the course of this phase, which normally takes several years, supervisors asses not only the professional capabilities of a trainee, but also bis psychic and physical performance and aptitude, e.g., with respect to decision making, leadership qualifications or behavior unter stress. The advisability of introducing psychological aptitude tests was also studied. However, a decision was recently taken to defer such psychological tests for the time being. Yet, nuclear power plant operators are required to submit a statement to their responsible authorities about industrial medical checkups and qualification assessments by supervisors.

  13. Qualification tests for shift personnel in nuclear power plants

    International Nuclear Information System (INIS)

    Fechner, J.B.

    1978-01-01

    The selection of personnel for training as shift supervisors or reactor operators so far used to be made by a plant operator mainly on the basis of such criteria as examinations, diplomas and other documents verifying the educational background, the type of activity exercised, and professional success. In addition, there are the opininons of trainers and supervisors based on personal observation of future shift personnel on training for specific plants at a training center, at the manufacturer's, the operator's or in activities in the construction and commissioning of the respective nuclear power plant. In the course of this phase, which normally takes several years, supervisors asses not only the professional capabilities of a trainee, but also bis psychic and physical performance and aptitude, e.g., with respect to decision making, leadership qualifications or behavior unter stress. The advisability of introducing psychological aptitude tests was also studied. However, a decision was recently taken to defer such psychological tests for the time being. Yet, nuclear power plant operators are required to submit a statement to their responsible authorities about industrial medical checkups and qualification assessments by supervisors. (orig.) [de

  14. Development, construction and testing of a vertical axis 200 kW wind turbine

    Energy Technology Data Exchange (ETDEWEB)

    1974-12-20

    It is proposed to design and develop a large vertical axis wind turbine that will generate economically 200 kilowatts of power at a wind speed of about 30 miles per hour. The scope of this proposal is to carry out studies, build, erect and test an electrical power generation plant that will feed into existing power grids. Preliminary technical studies indicate that the power of the turbine increases with the third power of the the wind speed. The rotor power loading should be as high as the prevailing winds allow; thus it would always be advisable to let the rotor run at as high an rpm as the economics will allow. For turbines up to about 100 ft in diameter, an extruded blade seems to be the best solution for economic rotor design. A 300 ft/s runaway tip speed seems to be acceptable as an rpm limit. Structurally, it is advantageous to increase the blade airfoil section to 18%. The proposed program has a very high probability of success in that each element of the total system involves a very low technical risk. The manufacturing methods rely on existing technology, and preliminary research indicates that readily available commercial materials can be used. There will be no involvement with highly stressed, fatigue-sensitive components. The total unit energy cost will be about fifty percent less for the proposed 90 ft. turbine than for the 15 ft. turbine produced for the National Research Council. 8 figs., 12 tabs.

  15. Large Cryogenic Infrastructure for LHC Superconducting Magnet and Cryogenic Component Tests: Layout, Commissioning and Operational Experience

    International Nuclear Information System (INIS)

    Calzas, C.; Chanat, D.; Knoops, S.; Sanmarti, M.; Serio, L.

    2004-01-01

    The largest cryogenic test facility at CERN, located at Zone 18, is used to validate and to test all main components working at cryogenic temperature in the LHC (Large Hadron Collider) before final installation in the machine tunnel. In total about 1300 main dipoles, 400 main quadrupoles, 5 RF-modules, eight 1.8 K refrigeration units will be tested in the coming years.The test facility has been improved and upgraded over the last few years and the first 18 kW refrigerator for the LHC machine has been added to boost the cryogenic capacity for the area via a 25,000 liter liquid helium dewar. The existing 6 kW refrigerator, used for the LHC Test String experiments, will also be employed to commission LHC cryogenic components.We report on the design and layout of the test facility as well as the commissioning and the first 10,000 hours operational experience of the test facility and the 18 kW LHC refrigerator

  16. Design and Control of a 3 kW Wireless Power Transfer System for Electric Vehicles

    Directory of Open Access Journals (Sweden)

    Zhenshi Wang

    2015-12-01

    Full Text Available This paper aims to study a 3 kW wireless power transfer system for electric vehicles. First, the LCL-LCL topology and LC-LC series topology are analyzed, and their transfer efficiencies under the same transfer power are compared. The LC-LC series topology is validated to be more efficient than the LCL-LCL topology and thus is more suitable for the system design. Then a novel q-Zsource-based online power regulation method which employs a unique impedance network (two pairs of inductors and capacitors to couple the cascaded H Bridge to the power source is proposed. By controlling the shoot-through state of the H Bridge, the charging current can be adjusted, and hence, transfer power. Finally, a prototype is implemented, which can transfer 3 kW wirelessly with ~95% efficiency over a 20 cm transfer distance.

  17. Experimental Investigation from the Operation of a 2 kW Brayton Power Conversion Unit and a Xenon Ion Thruster

    Science.gov (United States)

    Hervol, David; Mason, Lee; Birchenough, Art; Pinero, Luis

    2004-01-01

    A 2kW Brayton Power Conversion Unit (PCU) and a xenon ion thruster were integrated with a Power Management and Distribution (PMAD) system as part of a Nuclear Electric Propulsion (NEP) Testbed at NASA's Glenn Research Center. Brayton Converters and ion thrusters are potential candidates for use on future high power NEP mission such as the proposed Jupiter Icy Moons Orbiter (JIMO). The use of a existing lower power test hardware provided a cost effective means to investigate the critical electrical interface between the power conversion system and the propulsion system. The testing successfully demonstrated compatible electrical operations between the converter and the thruster, including end-to-end electric power throughput, high efficiency AC to DC conversion, and thruster recycle fault protection. The details of this demonstration are reported herein.

  18. Dry anaerobic digestion of cow manure and agricultural products in a full-scale plant: Efficiency and comparison with wet fermentation.

    Science.gov (United States)

    Chiumenti, Alessandro; da Borso, Francesco; Limina, Sonia

    2018-01-01

    For years, anaerobic digestion processes have been implemented for the management of organic wastes, agricultural residues, and animal manure. Wet anaerobic digestion still represents the most common technology, while dry fermentation, dedicated to the treatment of solid inputs (TS>20%) can be considered as an emerging technology, not in terms of technological maturity, but of diffusion. The first agricultural dry anaerobic digestion plant constructed in Italy was monitored from the start-up, for over a year. The plant was fed with manure and agricultural products, such as corn silage, triticale, ryegrass, alfalfa, and straw. Three Combined Heat and Power units, for a total installed power of 910kW e , converted biogas into thermal and electric energy. The monitoring included the determination of quality and quantity of input feedstocks, of digestate (including recirculation rate), of leachate, biogas quality (CH 4 , CO 2 , H 2 S), biogas yield, energy production, labor requirement for loading, and unloading operations. The results of the monitoring were compared to performance data obtained in several full scale wet digestion plants. The dry fermentation plant revealed a start-up phase that lasted several months, during which the average power resulted in 641kW e (70.4% of nominal power), and the last period the power resulted in 788kW e (86.6% of installed power). Improving the balance of the input, the dry fermentation process demonstrated biogas yields similar to wet anaerobic digestion, congruent to the energy potential of the biomasses used in the process. Furthermore, the operation of the plant required significant man labor, mainly related to loading and unloading of the anaerobic cells. Copyright © 2017 Elsevier Ltd. All rights reserved.

  19. Acceptance test procedure for the 105-KW isolation barrier leak rate

    International Nuclear Information System (INIS)

    McCracken, K.J.

    1995-01-01

    This acceptance test procedure shall be used to: First establish a basin water loss rate prior to installation of the two isolation barriers between the main basin and the discharge chute in K-Basin West. Second, perform an acceptance test to verify an acceptable leakage rate through the barrier seals. This Acceptance Test Procedure (ATP) has been prepared in accordance with CM-6-1 EP 4.2, Standard Engineering Practices

  20. Results of 200 KW fuel cell evaluation programs

    Energy Technology Data Exchange (ETDEWEB)

    Torrey, J.M.; Merten, G.P. [SAIC, San Diego, CA (United States); Binder, M.J. [Army Construction Engineering Research Labs., Champaign, IL (United States)] [and others

    1996-12-31

    Science Applications International Corporation (SAIC) has installed six monitoring systems on ONSI Corporation 200 kW phosphoric acid fuel cells. Three of the systems were installed for the U.S. Army Construction Engineering Research Laboratories (USACERL) which is coordinating the Department of Defense (DoD) fuel cell Demonstration Program and three were installed under a contract with the New York State Energy Research and Development Authority (NYSERDA). Monitoring of the three NYSERDA sites has been completed. Monitoring systems for the DoD fuel cells were installed in August, 1996 and thus no operating data was available at the time of this writing, but will be presented at the Fuel Cell Seminar. This paper will present the monitoring configuration and research approach for each program. Additionally, summary performance data is presented for the completed NYSERDA program.

  1. The first operation of the Delphos plant: Test results

    International Nuclear Information System (INIS)

    Sarno, A.; Noviello, G.; Cordisco, S.; Di Paola, L.; Guerra, M.

    1991-09-01

    The data collected during the O and M of the Delphos plant and the testing results are presented and discussed. Together with the maintenance influence on the operation and production of the plant, the various downtime causes are pointed out. An extensive activity has been carried out to investigate the actual behaviour of the photovoltaic generator and the power conditioning unit. The analysis of the experimental results allows to focus on the different causes of loss and suggest some actions to be taken in order to improve the plant efficiency and increase the energy production. (author)

  2. Numerical Simulation of MIG for 42 GHz, 200 kW Gyrotron

    Science.gov (United States)

    Singh, Udaybir; Bera, Anirban; Kumar, Narendra; Purohit, L. P.; Sinha, Ashok K.

    2010-06-01

    A triode type magnetron injection gun (MIG) of a 42 GHz, 200 kW gyrotron for an Indian TOKAMAK system is designed by using the commercially available code EGUN. The operating voltages of the modulating anode and the accelerating anode are 29 kV and 65 kV respectively. The operating mode of the gyrotron is TE03 and it is operated in fundamental harmonic. The simulated results of MIG obtained with the EGUN code are validated with another trajectory code TRAK.

  3. Design of diode electron gun for 250 kW CW klystron

    International Nuclear Information System (INIS)

    Prasad, M.; Pande, S.A.; Hannurkar, P.R.

    2005-01-01

    A 250 kW CW klystron at frequencies 350 MHz and 700 MHz is being developed at Centre for Advanced Technology. These klystrons are required for forthcoming project like 100 MeV proton Linac for Spallation Neutron Source (SNS) as a main rf sources. In order to develop klystrons, we have designed the diode electron gun, which delivers more than 10 A beam current at 50 kV. This paper describes the simulation results of electron gun with computer code EGUN. (author)

  4. Multifrequency tests in the EBR-II reactor plant

    International Nuclear Information System (INIS)

    Feldman, E.E.; Mohr, D.; Gross, K.C.

    1989-01-01

    A series of eight multifrequency tests was conducted on the Experimental Breeder Reactor II. In half of the tests a control rod was oscillated and in the other half the controller input voltage to the intermediate-loop-sodium pump was perturbed. In each test the input disturbance consisted of several superimposed single-frequency sinusoidal harmonics of the same fundamental. The tests are described along with the theoretical and practical aspects of their development and design. Samples of measured frequency responses are also provided for both the reactor and the power plant. 22 refs., 5 figs., 2 tabs

  5. Processing with kW fibre lasers: advantages and limits

    Science.gov (United States)

    Kratky, A.; Schuöcker, D.; Liedl, G.

    2008-10-01

    Up-to-date fibre lasers produce multi-kw radiation with an excellent beam quality. Compared to CO2-lasers, fibre lasers have relatively low operational costs and offer a very high flexibility in production due to the beam delivery with process fibres. As a consequence, fibre lasers have attracted more and more attention. On the other hand, their use in industrial applications especially in the automotive industry is still limited to a certain extent and fibre lasers haven't replaced all other laser sources till now as it could be expected. In laser cutting, the small kerf width produced by fibre lasers should be advantageous since the heated volume is smaller compared to CO2-lasers. In fact, cutting velocities are usually much higher which is also caused by the higher absorption coefficient of most metals at the wavelength emitted by fibre lasers. Nevertheless, cutting with fibre lasers of some metals - e.g. stainless steels - is restricted to a small thicknesses of approx. 5mm. The reason for this is that the surface roughness of the edges increases dramatically with the thickness of the work piece. Applications of fibre lasers include e.g. remote welding or even remote cutting of a large variety of materials with usually excellent results. Due to the excellent beam quality the aspect ratio of the weld seam in relation to the penetration depth is quite good. In the case of thin sheet metal welding such a small beam waist is beneficial - but with thicker sheet metals it is very often disadvantageous since the preparation of samples is more complicated, costs increase and requirements on clamping devices rise. In this paper, advantages and disadvantages of fibre lasers are discussed briefly. Applications of a 1.5 kW fibre laser are presented and compared to classical laser systems.

  6. Photovoltaic applications in the southwest for the National Park Service. [10 to 100 kW

    Energy Technology Data Exchange (ETDEWEB)

    Peatfield, C.R.; Jarvinen, P.O.

    1977-04-28

    Nearly three megawatts of electrical power are produced annually by diesel/electric generator sets at National Park Service sites, according to a survey conducted jointly by the NPS and MIT/Lincoln Laboratory. To prove the economic viability of photovoltaic power generation systems to meet NPS electric power needs as well as to stimulate public acceptance and reliance on solar-generated electricity, NPS and MIT/LL are cooperating in a Field Tests and Applications Project sponsored by the U.S. Energy Research and Development Administration. The power level for the applications will be in the range from 10 to 100 kW. Ten of the most promising NPS sites were visited and evaluated. Based on ten criteria, Natural Bridges National Monument in Utah was selected as the optimum first pick. The FT and A Project and evaluation details for the ten sites are described.

  7. Design of commercial dyeing wastewater treatment facility with e-beam (based on the results of pilot plant)

    International Nuclear Information System (INIS)

    Han, Bumsoo; Kim, Sung Myun; Kim, Jin-Kyu; Kim, Yuri; Yang, Mun Ho; Choi, J.S.; Ahn, S.J.; Pikaev, A.K.; Makarov, I.E.; Ponomarev, A.V.

    2001-01-01

    A pilot plant for a large-scale test of dyeing facility wastewater (flow rate of 1,000m 3 per day from 80,000m 3 /day of total wastewater) was constructed and operated with the electron accelerator of 1MeV, 40kW. The accelerator was installed in February 1998 and the Tower Style Biological treatment facility (TSB) was also installed in October 1998. The wastewater is injected under the e-beam irradiation area through the nozzle type injector to obtain the adequate penetration depth. The speed of injection could be varied upon the dose and dose rate. Performance statistics are given

  8. Testing of an acoustic smolt deflection system, Blantyre hydroelectric power scheme

    International Nuclear Information System (INIS)

    1996-01-01

    The aim of this study was to test the effectiveness of an underwater acoustic barrier as a means of preventing the entry of salmon (Salmo salar) and sea trout (Salmo trutta) smolts and other fish into the water intake of a hydro-electric power (HEP) station. A secondary objective was to measure the injury rate of fish passed through the turbine, so that the risk to any fish that penetrated the acoustic barrier could also be determined. The test site, which was a 575kW Kaplan plant located at Blantyre on the R. Clyde, Lanarkshire, was selected as being representative of run-of-river sites currently being developed under the Government's NFFO (Non-Fossil Fuel Obligation) and SRO (Scottish Renewables Order) schemes. A further objective was to disseminate information arising from the project to the scientific and HEP community. (author)

  9. 77 FR 73056 - Initial Test Programs for Water-Cooled Nuclear Power Plants

    Science.gov (United States)

    2012-12-07

    ... Plants AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide; request for comment... (DG), DG-1259, ``Initial Test Programs for Water-Cooled Nuclear Power Plants.'' This guide describes... (ITPs) for light water cooled nuclear power plants. DATES: Submit comments by January 31, 2013. Comments...

  10. Trimode optimizes hybrid power plants. Final report: Phase 2

    Energy Technology Data Exchange (ETDEWEB)

    O`Sullivan, G.A.; O`Sullivan, J.A. [Abacus Controls, Inc., Somerville, NJ (United States)

    1998-07-01

    In the Phase 2 project, Abacus Controls Inc. did research and development of hybrid systems that combine the energy sources from photovoltaics, batteries, and diesel-generators and demonstrated that they are economically feasible for small power plants in many parts of the world. The Trimode Power Processor reduces the fuel consumption of the diesel-generator to its minimum by presenting itself as the perfect electrical load to the generator. A 30-kW three-phase unit was tested at Sandia National Laboratories to prove its worthiness in actual field conditions. The use of photovoltaics at remote locations where reliability of supply requires a diesel-generator will lower costs to operate by reducing the run time of the diesel generator. The numerous benefits include longer times between maintenance for the diesel engine and better power quality from the generator. 32 figs.

  11. The assesment on safety distance determination of hydrogen production plant with RGTT200K reactor

    International Nuclear Information System (INIS)

    Siti Alimah; Sriyono

    2013-01-01

    The one of the hydrogen production process method coupled to RGTT200K is the utilization of steam reforming with (methane) natural gas as the feedstock. The integration between RGTT200K and hydrogen plant must consider many safety aspects and one of it is separation distance between these two systems. The purpose of this assessment is to study the sources of fires/explosion and to determine the safety distance between the steam reforming hydrogen production plant and RGTT200K reactor. The used methodology was literature assessment and safety distance calculation with equation R = k.W 1/3 . In this studi, safety distance determination in integration between RGTT200K and hydrogen plant was using equation based on reference of the USNRC Regulatory Guide 1.91 and mass on the equation was mass equivalent of TNT (kg). The results of the study show the hydrogen plant produces 160.000 m 3 /day, if requires storage tanks of 400.000 m 3 (based USNRC equal to 1.859 million tons of TNT equivalent) with factor k is 8, based on the equation R = k.W 1/3 , so the requirement for safety distance is 1 km. This distance may be shortened by adding a fire proof wall barrier and requires further assessment. (author)

  12. Development of 750 keV/20kW DC accelerator

    International Nuclear Information System (INIS)

    Bapna, S.C.; Banwari, R.; Venkateswaran, S.V.; Tripathi, Alok; Kasliwal, Apollo; Pramod, R.; Kumar, Pankaj

    2001-01-01

    This paper discusses development of a DC accelerator at CAT for industrial applications. This accelerator is housed in two floors; first floor having the accelerator and the ground floor is an irradiation cell. It will operate in the voltage range of 300kV to 750kV and will give maximum beam power of 20kW. The electron gun, acceleration column, focusing coil, high voltage multiplier stack, filament power supply and the control unit are housed in a 1.5 m diameter 3.2 m high pressure vessel which will be pressurized to 5.5 bar of SF 6 gas

  13. Potential of Micro Hydroelectric Generator Embedded at 30,000 PE Effluent Discharge of Sewerage Treatment Plant

    Science.gov (United States)

    Che Munaaim, M. A.; Razali, N.; Ayob, A.; Hamidin, N.; Othuman Mydin, M. A.

    2018-03-01

    A micro hydroelectric generator is an energy conversion approach to generate electricity from potential (motion) energy to an electrical energy. In this research, it is desired to be implemented by using a micro hydroelectric generator which is desired to be embedded at the continuous flow of effluent discharge point of domestic sewerage treatment plant (STP). This research evaluates the potential of electricity generation from micro hydroelectric generator attached to 30,000 PE sewerage treatment plant. The power output obtained from calculation of electrical power conversion is used to identify the possibility of this system and its ability to provide electrical energy, which can minimize the cost of electric bill especially for the pumping system. The overview of this system on the practical application with the consideration of payback period is summarized. The ultimate aim of the whole application is to have a self-ecosystem electrical power generated for the internal use of STP by using its own flowing water in supporting the sustainable engineering towards renewable energy and energy efficient approach. The results shows that the output power obtained is lower than expected output power (12 kW) and fall beyond of the range of a micro hydro power (5kW - 100kW) since it is only generating 1.58 kW energy by calculation. It is also observed that the estimated payback period is longer which i.e 7 years to recoup the return of investment. A range of head from 4.5 m and above for the case where the flow shall at least have maintained at 0.05 m3/s in the selected plant in order to achieved a feasible power output. In conclusion, wastewater treatment process involves the flowing water (potential energy) especially at the effluent discharge point of STP is possibly harvested for electricity generation by embedding the micro hydroelectric generator. However, the selection of STP needs to have minimum 4.5 meter head with 0.05 m3/s of continuously flowing water to make

  14. Potential of Micro Hydroelectric Generator Embedded at 30,000 PE Effluent Discharge of Sewerage Treatment Plant

    Directory of Open Access Journals (Sweden)

    Che Munaaim M.A.

    2018-01-01

    Full Text Available A micro hydroelectric generator is an energy conversion approach to generate electricity from potential (motion energy to an electrical energy. In this research, it is desired to be implemented by using a micro hydroelectric generator which is desired to be embedded at the continuous flow of effluent discharge point of domestic sewerage treatment plant (STP. This research evaluates the potential of electricity generation from micro hydroelectric generator attached to 30,000 PE sewerage treatment plant. The power output obtained from calculation of electrical power conversion is used to identify the possibility of this system and its ability to provide electrical energy, which can minimize the cost of electric bill especially for the pumping system. The overview of this system on the practical application with the consideration of payback period is summarized. The ultimate aim of the whole application is to have a self-ecosystem electrical power generated for the internal use of STP by using its own flowing water in supporting the sustainable engineering towards renewable energy and energy efficient approach. The results shows that the output power obtained is lower than expected output power (12 kW and fall beyond of the range of a micro hydro power (5kW - 100kW since it is only generating 1.58 kW energy by calculation. It is also observed that the estimated payback period is longer which i.e 7 years to recoup the return of investment. A range of head from 4.5 m and above for the case where the flow shall at least have maintained at 0.05 m3/s in the selected plant in order to achieved a feasible power output. In conclusion, wastewater treatment process involves the flowing water (potential energy especially at the effluent discharge point of STP is possibly harvested for electricity generation by embedding the micro hydroelectric generator. However, the selection of STP needs to have minimum 4.5 meter head with 0.05 m3/s of continuously flowing

  15. Modeling and Simulation for an 8 kW Three-Phase Grid-Connected Photo-Voltaic Power System

    Science.gov (United States)

    Cen, Zhaohui

    2017-09-01

    Gird-connected Photo-Voltaic (PV) systems rated as 5-10 kW level have advantages of scalability and energy-saving, so they are very typical for small-scale household solar applications. In this paper, an 8 kW three-phase grid-connected PV system model is proposed and studied. In this high-fidelity model, some basic PV system components such as solar panels, DC-DC converters, DC-AC inverters and three-phase utility grids are mathematically modelled and organized as a complete simulation model. Also, an overall power controller with Maximum Power Point Control (MPPT) is proposed to achieve both high-efficiency for solar energy harvesting and grid-connection stability. Finally, simulation results demonstrate the effectiveness of the PV system model and the proposed controller, and power quality issues are discussed.

  16. Modeling and Simulation for an 8 kW Three-Phase Grid-Connected Photo-Voltaic Power System

    Directory of Open Access Journals (Sweden)

    Cen Zhaohui

    2017-09-01

    Full Text Available Gird-connected Photo-Voltaic (PV systems rated as 5-10 kW level have advantages of scalability and energy-saving, so they are very typical for small-scale household solar applications. In this paper, an 8 kW three-phase grid-connected PV system model is proposed and studied. In this high-fidelity model, some basic PV system components such as solar panels, DC-DC converters, DC-AC inverters and three-phase utility grids are mathematically modelled and organized as a complete simulation model. Also, an overall power controller with Maximum Power Point Control (MPPT is proposed to achieve both high-efficiency for solar energy harvesting and grid-connection stability. Finally, simulation results demonstrate the effectiveness of the PV system model and the proposed controller, and power quality issues are discussed.

  17. Hvdc valve development outstrips testing capacity: new synthetic plant at Marchwood

    Energy Technology Data Exchange (ETDEWEB)

    1966-01-07

    A new test plant for high voltage direct current converters is being built at the CEGB's Marchwood Engineering Laboratories. Valve development has outstripped the 60 kV 600 A bridge rating of the existing zero power factor plant.

  18. Electron beams for power plant flue gas treatment

    International Nuclear Information System (INIS)

    Chmielewski, A.G.

    1998-01-01

    Among the processes in which fuel is used for energy generation coal burning plays leading role. On the other hand combustion of fossil fuels is the biggest source of air pollution. When burning fossil fuel pollutants such as particulate, sulfur oxides, nitrogen oxides, volatile organic compounds and others are emitted. Air pollution caused by these pollutants not only acts directly on environment but by contamination of water and soil leads to their degradation. The advanced technology for simultaneous SO 2 , NO x and VOC removal is discussed in the paper. The technology is based on electron accelerators applications. Many new solutions have been introduced in the new pilot plants which have been operated at coal fired power stations. 98% SO 2 and up to 90% NO x removals were obtained at very moderate energy consumption (for de SO x ). Additional agricultural tests have proven full applicability of byproduct in pure form or as a blending stock for NPK fertilizers. Two full scale industrial plants are being built in China (640 kW accelerators) and Poland (1.2 MW accelerators). These will be the biggest radiation processing units using accelerator technology all over the world

  19. High power testing of the multiple-loop radio-frequency drive concept for the FMIT accelerator

    International Nuclear Information System (INIS)

    Fazio, M.V.; Patton, R.D.

    1984-04-01

    The Fusion Materials Irradiation Test (FMIT) accelerator requires several 600-kW rf systems to simultaneously supply rf power to a single accelerator tank. Each rf-system output must be carefully phase and amplitude controlled to achieve the proper system performance. Two 80-MHz, 600-kW rf amplifiers with phase- and amplitude-control systems have been tested into a single, high-Q resonant cavity. Experimental results are presented

  20. Mobile power plant units

    Energy Technology Data Exchange (ETDEWEB)

    Radtke, R

    1979-10-05

    Diesel engines of the MaK line 282 AK/332 with a cylinder power up to 160 kW are used, either as 6-cylinder or 8-cylinder in-line engine or as 12-cylinder V engine. Fuel consumption is between 207 and 212 g/kW. The engine is mounted on a frame, together with a generator. The fuel reserve in the tank will last for 8 hours. The lubricating system, the cooling water and starting air system, the switchboard system, and the frame are described. The switchboard plant is mounted either on a skid undercarriage or on the undercarriage. The plant can be operated independently or parallel to the network. The unit can be remote-controlled via push buttons or control knobs. A picture is presented of a mobile diesel aggregate which is in service in Libya.

  1. A pilot test plan of the thermochemical water-splitting iodine-sulfur process

    International Nuclear Information System (INIS)

    Kubo, Shinji; Kasahara, Seiji; Okuda, Hiroyuki; Terada, Atsuhiko; Tanaka, Nobuyuki; Inaba, Yoshitomo; Ohashi, Hirofumi; Inagaki, Yoshiyuki; Onuki, Kaoru; Hino, Ryutaro

    2004-01-01

    Research and development (R and D) of hydrogen production systems using high-temperature gas-cooled reactors (HTGR) are being conducted by the Japan Atomic Research Institute (JAERI). To develop the systems, superior hydrogen production methods are essential. The thermochemical hydrogen production cycle, the IS (iodine-sulfur) process, is a prospective candidate, in which heat supplied by HTGR can be consumed for the thermal driving load. With this attractive feature, JAERI will conduct pilot-scale tests, aiming to establish technical bases for practical plant designs using HTGR. The hydrogen will be produced at a maximum rate of 30 m 3 /h, continuously using high-temperature helium gas supplied by a helium gas loop, with an electric heater of about 400 kW. The plant will employ an advanced hydroiodic acid-processing device for efficient hydrogen production, and the usefulness of the device was confirmed from mass and heat balance analysis. Through design works and the hydrogen production tests, valuable data for construction and operation will be acquired to evaluate detailed process performance for practical systems. After completing the pilot-scale tests, JAERI will move onto the next R and D step, which will be demonstrations of the IS process to which heat is supplied from a high-temperature engineering test reactor (HTTR)

  2. High Temperature Calcination - MACT Upgrade Equipment Pilot Plant Test

    Energy Technology Data Exchange (ETDEWEB)

    Richard D. Boardman; B. H. O& #39; Brien; N. R. Soelberg; S. O. Bates; R. A. Wood; C. St. Michel

    2004-02-01

    About one million gallons of acidic, hazardous, and radioactive sodium-bearing waste are stored in stainless steel tanks at the Idaho Nuclear Technology and Engineering Center (INTEC), which is a major operating facility of the Idaho National Engineering and Environmental Laboratory. Calcination at high-temperature conditions (600 C, with alumina nitrate and calcium nitrate chemical addition to the feed) is one of four options currently being considered by the Department of Energy for treatment of the remaining tank wastes. If calcination is selected for future processing of the sodium-bearing waste, it will be necessary to install new off-gas control equipment in the New Waste Calcining Facility (NWCF) to comply with the Maximum Achievable Control Technology (MACT) standards for hazardous waste combustors and incinerators. This will require, as a minimum, installing a carbon bed to reduce mercury emissions from their current level of up to 7,500 to <45 {micro}g/dscm, and a staged combustor to reduce unburned kerosene fuel in the off-gas discharge to <100 ppm CO and <10 ppm hydrocarbons. The staged combustor will also reduce NOx concentrations of about 35,000 ppm by 90-95%. A pilot-plant calcination test was completed in a newly constructed 15-cm diameter calciner vessel. The pilot-plant facility was equipped with a prototype MACT off-gas control system, including a highly efficient cyclone separator and off-gas quench/venturi scrubber for particulate removal, a staged combustor for unburned hydrocarbon and NOx destruction, and a packed activated carbon bed for mercury removal and residual chloride capture. Pilot-plant testing was performed during a 50-hour system operability test January 14-16, followed by a 100-hour high-temperature calcination pilot-plant calcination run January 19-23. Two flowsheet blends were tested: a 50-hour test with an aluminum-to-alkali metal molar ratio (AAR) of 2.25, and a 50-hour test with an AAR of 1.75. Results of the testing

  3. Acceptance test report: Backup power system

    International Nuclear Information System (INIS)

    Cole, D.B.

    1996-01-01

    Acceptance Test Report for construction functional testing of Project W-030 Backup Power System. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. Backup power includes a single 125 KW diesel generator, three 10-kva uninterruptible power supply units, and all necessary control

  4. ESCRIME: testing bench for advanced operator workstations in future plants

    International Nuclear Information System (INIS)

    Poujol, A.; Papin, B.

    1994-01-01

    The problem of optimal task allocation between man and computer for the operation of nuclear power plants is of major concern for the design of future plants. As the increased level of automation induces the modification of the tasks actually devoted to the operator in the control room, it is very important to anticipate these consequences at the plant design stage. The improvement of man machine cooperation is expected to play a major role in minimizing the impact of human errors on plant safety. The CEA has launched a research program concerning the evolution of the plant operation in order to optimize the efficiency of the human/computer systems for a better safety. The objective of this program is to evaluate different modalities of man-machine share of tasks, in a representative context. It relies strongly upon the development of a specific testing facility, the ESCRIME work bench, which is presented in this paper. It consists of an EDF 1300MWe PWR plant simulator connected to an operator workstation. The plant simulator model presents at a significant level of details the instrumentation and control of the plant and the main connected circuits. The operator interface is based on the generalization of the use of interactive graphic displays, and is intended to be consistent to the tasks to be performed by the operator. The functional architecture of the workstation is modular, so that different cooperation mechanisms can be implemented within the same framework. It is based on a thorough analysis and structuration of plant control tasks, in normal as well as in accident situations. The software architecture design follows the distributed artificial intelligence approach. Cognitive agents cooperate in order to operate the process. The paper presents the basic principles and the functional architecture of the test bed and describes the steps and the present status of the program. (author)

  5. Information on the Advanced Plant Experiment (APEX) Test Facility

    International Nuclear Information System (INIS)

    Smith, Curtis Lee

    2015-01-01

    The purpose of this report provides information related to the design of the Oregon State University Advanced Plant Experiment (APEX) test facility. Information provided in this report have been pulled from the following information sources: Reference 1: R. Nourgaliev and et.al, 'Summary Report on NGSAC (Next-Generation Safety Analysis Code) Development and Testing,' Idaho National Laboratory, 2011. Note that this is report has not been released as an external report. Reference 2: O. Stevens, Characterization of the Advanced Plant Experiment (APEX) Passive Residual Heat Removal System Heat Exchanger, Master Thesis, June 1996. Reference 3: J. Reyes, Jr., Q. Wu, and J. King, Jr., Scaling Assessment for the Design of the OSU APEX-1000 Test Facility, OSU-APEX-03001 (Rev. 0), May 2003. Reference 4: J. Reyes et al, Final Report of the NRC AP600 Research Conducted at Oregon State University, NUREG/CR-6641, July 1999. Reference 5: K. Welter et al, APEX-1000 Confirmatory Testing to Support AP1000 Design Certification (non-proprietary), NUREG-1826, August 2005.

  6. Physics design of a 10 MeV, 6 kW travelling wave electron linac

    Indian Academy of Sciences (India)

    We present the physics design of a 10 MeV, 6 kW S-band (2856 MHz) electron linear accelerator (linac), which has been recently built and successfully operated at Raja Ramanna Centre for Advanced Technology, Indore. The accelerating structure is a 2 π / 3 mode constant impedance travelling wave structure, which ...

  7. MegaFlex Scale-Up Cost & Risk Reduction for >50kW Future Power Demands, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — As the MegaFlex solar array is scaled for power demands greater than 50kW over the next 20 years and deployed load requirements remain high or increase, advanced...

  8. Potential for Producing Biogas from Agricultural Waste in Rural Plants in Poland

    Directory of Open Access Journals (Sweden)

    Magdalena Muradin

    2014-08-01

    Full Text Available This article is an overview of the current situation as well as future prospects for biogas production in rural plants in Poland. Our research has focused on the management of agricultural waste. While Poland’s agriculture and its local food industry have substantial potential, many barriers persist to the development not only of biogas plants but also in every other renewable source of energy. The main obstacles have to do with politically motivated economic factors. Our interest has been in larger plants having sufficient capacities to produce in excess of 500 kW of electricity. The paper also presents a case study of a biogas plant supply by organic, agrifood waste mixed with silage.

  9. Pressure test behaviour of embalse nuclear power plant containment structure

    International Nuclear Information System (INIS)

    Bruschi, S.; Marinelli, C.

    1984-01-01

    It's described the structural behaviour of the containment structure during the pressure test of the Embalse plant (CANDU type, 600MW), made of prestressed concrete with an epoxi liner. Displacement, strain, temperature, and pressure measurements of the containment structure of the Embalse Nuclear Power Plant are presented. The instrumentation set up and measurement specifications are described for all variables of interest before, during and after the pressure test. The analytical models to simulate the heat transfer due to sun heating and air convenction and to predict the associated thermal strains and displacements are presented. (E.G.) [pt

  10. Thermal performance of 2350 kW totally enclosed air to air cooled motor

    Energy Technology Data Exchange (ETDEWEB)

    Chang, C.C.; Kuo, S.C.; Chen, S.L. [National Taiwan Univ., Taipei, Taiwan (China). Dept. of Mechanical Engineering; Cheng, T.F. [TATUNG CO., Sanhsia, Taiwan (China)

    2009-07-01

    This study investigated numerically and experimentally the thermal performance of a 2350 kW enclosed air-to-air cooled motor. The experiment was divided into 2 sections. The centrifugal fans were tested using a standard test apparatus. Flow rates, output power, and pressure drop between the inlet and outlet were obtained. The motor was then tested to measure the flow rate of the external flow, and inlet and outlet temperatures of the external and internal flow in the heat exchanger. Motor performance was then simulated using a computational fluid dynamics (CFD) tool. Heat transfer within the motor was divided into external and internal flows. External flow was driven by the rotation of the centrifugal fan mounted to the frame on the motor shaft and passing through the tubes of a staggered heat exchanger mounted on the top of the frame. Internal flow was circulated through the heat exchanger by 2 axial fans located on either side of the rotor and cooled by the external flow. Axial and centrifugal fan simulations were in good agreement with results obtained during the experiments. The study demonstrated that the calculated velocity distributions of external flow fluids through the heat exchanger tubes are non-uniform. Air outlet temperatures for internal and external flows were estimated within 2 per cent. However, stator and rotor simulations were 3 per cent lower than experimental measured values. 7 refs., 1 tab., 15 figs.

  11. A 10-kW series resonant converter design, transistor characterization, and base-drive optimization

    Science.gov (United States)

    Robson, R. R.; Hancock, D. J.

    1982-01-01

    The development, components, and performance of a transistor-based 10 kW series resonant converter for use in resonant circuits in space applications is described. The transistors serve to switch on the converter current, which has a half-sinusoid waveform when the transistor is in saturation. The goal of the program was to handle an input-output voltage range of 230-270 Vdc, an output voltage range of 200-500 Vdc, and a current limit range of 0-20 A. Testing procedures for the D60T and D7ST transistors are outlined and base drive waveforms are presented. The total device dissipation was minimized and found to be independent of the regenerative feedback ratio at lower current levels. Dissipation was set at within 10% and rise times were found to be acceptable. The finished unit displayed a 91% efficiency at full power levels of 500 V and 20 A and 93.7% at 500 V and 10 A.

  12. Verification tests for remote controlled inspection system in nuclear power plants

    International Nuclear Information System (INIS)

    Kohno, Tadaaki

    1986-01-01

    Following the increase of nuclear power plants, the total radiation exposure dose accompanying inspection and maintenance works tended to increase. Japan Power Engineering and Inspection Corp. carried out the verification test of a practical power reactor automatic inspection system from November, 1981, to March, 1986, and in this report, the state of having carried out this verification test is described. The objects of the verification test were the equipment which is urgently required for reducing radiation exposure dose, the possibility of realization of which is high, and which is important for ensuring the safety and reliability of plants, that is, an automatic ultrasonic flaw detector for the welded parts of bend pipes, an automatic disassembling and inspection system for control rod driving mechanism, a fuel automatic inspection system, and automatic decontaminating equipments for steam generator water chambers, primary system crud and radioactive gas in coolant. The results of the verification test of these equipments were judged as satisfactory, therefore, the application to actual plants is possible. (Kako, I.)

  13. 100 kW two-staged gasification plant at the Technical University of Denmark. Results until the spring 1998; 100 kW totrinsforgasningsanlaeg paa DTU. Resultater til og med foraaret 1998

    Energy Technology Data Exchange (ETDEWEB)

    Dall Bentzen, J.; Brandt, P.; Goebel, B.; Hindsgaul Hansen, C.; Henriksen, U.

    1998-12-31

    During many years Technical University of Denmark (DTU) has worked with thermal conversion of biomass to gas. The aim is to use the gas for production of combined heating and power. DTU has developed a process: two-staged gasification. Compared to other processes of gasification this process has higher energy efficiency and lower tar in the produced gas. This report describes the experiments performed at a 100 kW two-staged gasification. The conclusions of the results were the following: Particle measuring: the particles from the gasification consist mainly of soot; Investigations of gas purifying: a venturi scrubber removes between 60 and 90 % of particles. A simple air filter afterwards removes the rest of the particles resulting in a particle load below 5 mg/Nm{sup 3}. A small bag filter filtrated 97 % of the particles; Tar measuring: the coke bed reduces the content of tar with a factor 5-9; Gas composition: the gas composition is stable and the highest calorific value is about 6 MJ/Nm{sup 3}; Temperature: the temperature in the pyrolysis pipe depends highly of moisture content of fuel. Gas temperature up to 1400 deg. C was measured and the surface temperature of the coke bed is about 950 deg. C; Pressure: phenomenon, which has influence on understanding drop of pressure in coke bed, is propounded; Mass balance: cold gas efficiency is about 90 %; Quality of coke: the coke from the two-staged gasification is qualified as active coal. The gasification is stable and easy to regulate. (EHS) EFP-97. 25 refs.

  14. Current developments in mechanized non-destructive testing in nuclear power plants

    International Nuclear Information System (INIS)

    Zeilinger, R.

    2008-01-01

    Nuclear power plants require frequent in-service activities to be carried out conscientiously in areas potentially hazardous to human operators (because of the associated radiation exposure), such as non-destructive testing of pressurized components of the steam system. Locations to be inspected in this way include the reactor pressure vessel, core internals, steam generators, pressurizers, and pipes. The codes to be used as a basis of these inspections demand high absolute positioning and repeating accuracy. These requirements can be met by mechanized test procedures. Accordingly, many new applications of, mostly mobile, robots have been developed over the past few years. The innovative control and sensor systems for stationary and mobile robots now on the market offer a potential for economic application in a large number of new areas in inspection, maintenance and service in nuclear power plants. More progress in this area is expected for the near future. Areva NP founded the new NDT Center, NETEC (Non-destructive Examination Technical Center), as a global technical center for non-destructive materials testing. NETEC is to advance research and development of all basic NDT technologies, robotics included. For many years, intelligeNDT has offered solutions and products for a variety of inspection and testing purposes and locations in nuclear power plants and is involved in continuous further development of the experience collected in nuclear power plants on the spot. (orig.)

  15. Design and experimental investigation of a 1 kW organic Rankine cycle system using R245fa as working fluid for low-grade waste heat recovery from steam

    International Nuclear Information System (INIS)

    Muhammad, Usman; Imran, Muhammad; Lee, Dong Hyun; Park, Byung Sik

    2015-01-01

    Highlights: • A 1 kW organic Rankine cycle test rig for waste heat recovery was investigated for net electric power output. • Low grade steam (1–3 bar) was used directly in evaporator as heat source. • Effect of superheating of working fluid on system performance was studied. • The maximum electric power output and thermal efficiency is 1016 W and 5.75% respectively. - Abstract: This work presents an experimental investigation of a small scale (1 kW range) organic Rankine cycle system for net electrical power output ability, using low-grade waste heat from steam. The system was designed for waste steam in the range of 1–3 bar. After the organic Rankine cycle system was designed and thermodynamic simulation was performed, equipment selection and construction of test rig was carried out. R245fa was used as working fluid, a scroll type expansion directly coupled with electrical generator produced a maximum electrical power output of 1.016 kW with 0.838 kW of net electrical power output. The thermal efficiency of the system was 5.64%, net efficiency was 4.66% and expander isentropic efficiency was 58.3% at maximum power output operation point. Maximum thermal efficiency was 5.75% and maximum expander isentropic efficiency obtained was 77.74% during the experiment. Effect of superheating of working fluid at expander inlet was also investigated which show that an increase in the degree of superheating by 1 °C reduces thermal efficiency of system by 0.021% for current system. The results indicated that the measured electric power output and enthalpy determined power output (after accounting for isentropic efficiency) differed by 40%. Similarly, the screw pump converted 42.25% of electric power to the enthalpy determined pumping power delivered to the working fluid. Both expander and screw pump were losing power in electric and mechanical losses (generator/motor) presenting a need of further development of these components for better efficiency. Heat loss in

  16. Analysis of the Opportunity for an Increase in the Thermal Power of Power Generating Units of Nuclear Power Plants (Part 1)

    OpenAIRE

    Chernousenko, Olga Yuriivna; Nikulenkova, Tetiana Volodymyrivna; Nikulenkov, Anatolii Hennadiiovych

    2017-01-01

    For Ukraine the realization of available reserves to increase the power of operating power units of nuclear plants is a vital problem the solution of which would allow us to increase electric power output. A special role is also played by economic priorities; in particular an increase in power by 1 kW is ten times cheaper in comparison with the construction of 1 kW of new power facilities. One more factor is the world experience in the field of an increase in the thermal power of operating po...

  17. APLIKASI MODEL QUAL2Kw UNTUK MENENTUKAN STRATEGI PENANGGULANGAN PENCEMARAN AIR SUNGAI GAJAHWONG YANG DISEBABKAN OLEH BAHAN ORGANIK (Aplication of Qual2Kw Model to Determine the Strategy in Solving Gajahwong River Water Pollution Caused by Organic Matter

    Directory of Open Access Journals (Sweden)

    Agnes Dyah Novitasari Lestari

    2013-11-01

    Full Text Available ABSTRAK Telah dilakukan pemodelan kualitas air terhadap Sungai Gajahwong menggunakan model QUAL2Kw untuk parameter DO-BOD. Diselidiki dinamika DO-BOD sungai tersebut pada kondisi eksisting tahun 2011. Oleh karena beban pencemar pada kondisi hujan dan tanpa hujan berbeda, maka prediksi dilakukan pada kedua kondisi tersebut. Hasil pemodelan QUAL2Kw untuk kondisi eksisting Sungai Gajahwong tahun 2011 menunjukkan bahwa pada kondisi hujan dan tanpa hujan, konsentrasi BOD sungai telah melebihi bakumutu air kelas II. Hasil simulasi menunjukkan bahwa (1 Pembangunan perumahan yang membuang limbah cairnya ke Sungai Gajahwong pada debit total 0,1 m3/s dengan konsentrasi BOD 10 mg/L dapat meningkatkan BOD serta menurunkan DO Sungai Gajahwong, dan (2 Pengelolaan kualitas air dan penanggulangan pencemaran air oleh bahan organik pada Sungai Gajahwong dapat dilakukan dengan strategi pembuatan IPAL komunal di setiap kabupaten dengan penurunan konsentrasi BOD hulu hingga 2 mg/L.   ABSTRACT Water quality modelling of Gajahwong River has been done using QUAL2Kw model for DO-BOD parameters. The dynamics of DO-BOD of the river on the existing conditions in 2011 has been investigated. Because of  the load of pollutants in the rainy condition and no rain condition was different, then the predictions made on both conditions. QUAL2Kw modelling results for Gajahwong River in year 2011 showed that the BOD concentration of the river on both conditions has exceeded water quality standards class II. The simulation results showed that: (1 Housing construction that discharge its liquid waste into Gajahwong River on total discharge 0,1 m3/s with concentration of BOD 10 mg/L, increased the BOD and decreased the DO of Gajahwong River, and (2 Water quality management and organic pollution control of Gajahwong River can be done by a strategy of making communal WWTP in each district with reduction of the upstream BOD concentration to 2 mg /L.

  18. Small, modular, low-cost coal-fired power plants for the international market

    Energy Technology Data Exchange (ETDEWEB)

    Zauderer, B.; Frain, B.; Borck, B. [Coal Tech Corp., Merion Station, PA (United States); Baldwin, A.L. [Dept. of Energy, Pittsburgh, PA (United States). Pittsburgh Energy Technology Center

    1997-12-31

    This paper presents recent operating results of Coal Tech`s second generation, air cooled, slagging coal combustor, and its application to power plants in the 1 to 20 MW range. This 20 MMBtu/hour combustor was installed in a new demonstration plant in Philadelphia, PA in 1995. It contains the combustion components of a 1 MWe coal fired power plant, a 17,500 lb/hour steam boiler, coal storage and feed components, and stack gas cleanup components. The plant`s design incorporates improvements resulting from 2,000 hours of testing between 1987 and 1993 on a first generation, commercial scale, air cooled combustor of equal thermal rating. Since operations began in early 1996, a total of 51 days of testing have been successfully completed. Major results include durability of the combustor`s refractory wall, excellent combustion with high ash concentration in the fuel, removal of 95% to 100% of the slag in the combustor, very little ash deposition in the boiler, major reduction of in-plant parasitic power, and simplified power system control through the use of modular designs of sub-systems and computer control. Rapid fuel switching between oil, gas, and coal and turndown of up to a factor of three was accomplished. All these features have been incorporated in advanced coal fired plant designs in the 1 to 20 MWe range. Incremental capital costs are only $100 to $200/kW higher than comparable rated gas or oil fired steam generating systems. Most of its components and subsystems can be factory assembled for very rapid field installation. The low capital, low operating costs, fuel flexibility, and compatibility with very high ash fuels, make this power system very attractive in regions of the world having domestic supplies of these fuels.

  19. Melter operation results in chemical test at Rokkasho Reprocessing Plant

    International Nuclear Information System (INIS)

    Kanehira, Norio; Yoshioka, Masahiro; Muramoto, Hitoshi; Oba, Takaaki; Takahashi, Yuji

    2005-01-01

    Chemical Test of the glass melter system of the Vitrification Facility at Rokkasho Reprocessing Plant (RRP) was performed. In this test, basic performance of heating-up of the melter, melting glass, pouring glass was confirmed using simulated materials. Through these tests and operation of all modes, good results were gained, and training of operators was completed. (author)

  20. Full scale experimental study of a small natural draft dry cooling tower for concentrating solar thermal power plant

    International Nuclear Information System (INIS)

    Li, Xiaoxiao; Duniam, Sam; Gurgenci, Hal; Guan, Zhiqiang; Veeraragavan, Anand

    2017-01-01

    Highlights: • A 20 m high natural draft dry cooling tower is designed and tested. • The cooling tower model is refined and validated with the experimental data. • The performance of the cooling tower utilized in a CST power plant is investigated. • Ambient temperature effect on Rankine cycle and Brayton cycle is discussed. - Abstract: Concentrating solar thermal power system can provide low carbon, renewable energy resources in countries or regions with strong solar irradiation. For this kind of power plant which is likely to be located in the arid area, natural draft dry cooling tower is a promising choice. To develop the experimental studies on small cooling tower, a 20 m high natural draft dry cooling tower with fully instrumented measurement system was established by the Queensland Geothermal Energy Centre of Excellence. The performance of this cooling tower was measured with the constant heat input of 600 kW and 840 kW and with ambient temperature ranging from 20 °C to 32 °C. The cooling tower numerical model was refined and validated with the experimental data. The model of 1 MW concentrating solar thermal supercritical CO_2 power cycle was developed and integrated with the cooling tower model. The influences of changing ambient temperature and the performance of the cooling tower on efficiency of the power system were simulated. The differences of the mechanism of the ambient temperature effect on Rankine cycle and supercritical CO_2 Brayton cycle were analysed and discussed.

  1. Degradation of PVC/HC blends. II. Terrestrial plant growth test.

    Science.gov (United States)

    Pascu, Mihaela; Agafiţei, Gabriela-Elena; Profire, Lenuţa; Vasile, Cornelia

    2009-01-01

    The behavior at degradation by soil burial of some plasticized polyvinyl chloride (PVC) based blends with a variable content of hydrolyzed collagen (HC) has been followed. The modifications induced in the environment by the polymer systems (pH variation, physiologic state of the plants, assimilatory pigments) were studied. Using the growth test of the terrestrial plants, we followed the development of Triticum (wheat), Helianthus annus minimus (little sunflower), Pisum sativum (pea), and Vicia X hybrida hort, during a vegetation cycle. After the harvest, for each plant, the quantities of chlorophyll and carotenoidic pigments and of trace- and macroelements were determined. It was proved that, in the presence of polymer blends, the plants do not suffer morphological and physiological modifications, the products released in the culture soil being not toxic for the plants growth.

  2. Testing of mobile surveillance robot at a nuclear power plant

    International Nuclear Information System (INIS)

    White, J.R.; Harvey, H.W.; Farnstrom, K.A.

    1987-01-01

    In-plant testing of a mobile surveillance robot (SURBOT) was performed at the Browns Ferry Nuclear Plant by TVA personnel. The results verified that SURBOT can be used for remote surveillance in 54 separate controlled radiation rooms at the plant. High-quality color video, audio, and other data are collected, digitized by an on-board computer, and transmitted through a cable to the control console for real-time display and videotaping. TVA projects that the use of SURBOT for surveillance during plant operation will produce annual savings of about 100 person-rem radiation exposure and $200,000 in operating costs. Based on the successful results of this program, REMOTEC is now commercializing the SURBOT technology on both wheeled and tracked mobile robots for use in nuclear power plants and other hazardous environments

  3. The conditions for use of reed canary grass briquettes and chopped reed canary grass in small heating plants; Foerutsaettningar foer anvaendning av roerflensbriketter och hackad roerflen i mindre vaermecentraler

    Energy Technology Data Exchange (ETDEWEB)

    Paulrud, Susanne; Davidsson, Kent; Holmgren, Magnus A. (Swedish National Testing and Research Inst., Boraas (Sweden)); Hedman, Henry; Oehman, Rikard; Leffler, Joel (ETC, Piteaa (Sweden))

    2010-09-15

    The aim of this study was to test fuel blends of briquettes and chopped reed canary grass in three existing heating plants (50 kW - 500 kW) and elucidate the requirements for good performance and low emissions. In addition, the study investigated production of reed canary grass briquettes using a Polish screw press developed for straw. Some tests with a bale shredder were also undertaken. The screw press technique is of interest for reed canary grass because it is a simple technique, easy to handle, developed for small scale production, and for straw. The test with reed canary grass in this study showed that the technique worked well but that further adjustments and a longer test period are needed in order to achieve higher bulk density and mechanical strength. The test with chopped reed canary grass shows that a system with a forage harvester is slightly more effective than baling and cutting in a bale shredder. The study concluded that few existing heating plants of size 50 kW-1 MW that currently use wood fuels will be able to use reed canary grass without adjustment, conversion or replacement of the combustion equipment. Reed canary grass has 15-20 times higher ash content than wood briquettes and 2-3 times higher ash content than forest residue; the combustion equipment must be able to handle these properties. The boiler must be equipped with a continuously operating ashing system and it must be possible to move the ash bed mechanically. There is a risk of high content of unburned matter if the residence time in the boiler is too short, due to the structure and low bulk density of the reed canary grass ash. Using a blend of wood briquettes and reed canary briquettes results in lower ash content, but also affects the ash chemistry and tends to lower the initial ash fusion temperature compared to using 100 % reed canary grass. Blending chopped reed canary grass and wood chips in an existing small scale heating plant also requires measures to achieve an even fuel

  4. EBT-S 28-GHz, 200-kW, CW, mixed-mode, quasi-optical plasma heating system

    International Nuclear Information System (INIS)

    White, T.L.; Kimrey, H.D.; Bigelow, T.S.; Bates, D.D.; Eason, H.O.

    1984-07-01

    The ELMO Bumpy Torus-Scale (EBT-S) 28-GHz, 200-kW, cw, plasma heating system consists of a gyrotron oscillator, an oversized waveguide two-bend transmission system, and a quasi-optical mixed-mode microwave distribution manifold that feeds microwave power to the 24 plasma loads of the EBT-S fusion experiment. Balancing power to the 24 loads of the EBT-S fusion experiment. Balancing power to the 24 loads was achieved by adjusting the areas at 24 coupling irises. System performance is easily measured using system calorimetry. The distribution manifold mixed-mode power transmission, reflection, and loss coefficients are 89%, 6%, and 5%, respectively. The overall system efficiency (plasma power/gyrotron power) is 80%, but with some modifications to the distribution manifold we believe the ultimate efficiency can approach 90%. The system reliability is outstanding with a world's record 1 x 10 5 kW h of 28-GHz energy delivered to the EBT-S device with well over 1 x 10 3 operating hours

  5. Exergy analysis of a circulating fluidized bed boiler cogeneration power plant

    International Nuclear Information System (INIS)

    Gürtürk, Mert; Oztop, Hakan F.

    2016-01-01

    Highlights: • Analysis of energy and exergy for a cogeneration power plant have been performed. • This plant has circulating fluidized bed boiler. • Energy and exergy efficiencies of the boiler are obtained as 84.65% and 29.43%, respectively. • Exergy efficiency of the plant was calculated as 20%. - Abstract: In this study, energy and exergy analysis of a cogeneration power plant have been performed. The steam which is produced by the cogeneration power plant is used for salt production and most important part of the cogeneration power plant is the circulation fluidized bed boiler. Energy and exergy efficiency of the circulation fluidized bed boiler were found as 84.65% and 29.43%, respectively. Exergy destruction of the circulation fluidized bed boiler was calculated as 21789.39 kW and 85.89% of exergy destruction in the plant. The automation system of the cogeneration power plant is insufficient. Exergy efficiency of the plant was calculated as 20%. Also, some design parameters increasing energy losses were determined.

  6. 1?10 kW Stationary Combined Heat and Power Systems Status and Technical Potential: Independent Review

    Energy Technology Data Exchange (ETDEWEB)

    Maru, H. C.; Singhal, S. C.; Stone, C.; Wheeler, D.

    2010-11-01

    This independent review examines the status and technical potential of 1-10 kW stationary combined heat and power fuel cell systems and analyzes the achievability of the DOE cost, efficiency, and durability targets for 2012, 2015, and 2020.

  7. Medicinal Plants Based Products Tested on Pathogens Isolated from Mastitis Milk

    Directory of Open Access Journals (Sweden)

    Claudia Pașca

    2017-09-01

    Full Text Available Bovine mastitis a major disease that is commonly associated with bacterial infection. The common treatment is with antibiotics administered intramammary into infected quarters of the udder. The excessive use of antibiotics leads to multidrug resistance and associated risks for human health. In this context, the search for alternative drugs based on plants has become a priority in livestock medicine. These products have a low manufacturing cost and no reports of antimicrobial resistance to these have been documented. In this context, the main objective of this study was to determine the antimicrobial effect of extracts and products of several indigenous, or acclimatized plants on pathogens isolated from bovine mastitis. A total of eleven plant alcoholic extracts and eight plant-derived products were tested against 32 microorganisms isolated from milk. The obtained results have shown an inhibition of bacterial growth for all tested plants, with better results for Evernia prunastri, Artemisia absinthium, and Lavandula angustifolia. Moreover, E. prunastri, Populus nigra, and L. angustifolia presented small averages of minimum inhibitory and bactericidal concentrations. Among the plant-derived products, three out of eight have shown a strong anti-microbial effect comparable with the effect of florfenicol and enrofloxacin, and better than individual plant extracts possibly due to synergism. These results suggest an important anti-microbial effect of these products on pathogens isolated from bovine mastitis with a possible applicability in this disease.

  8. Development of a coupled reactor with a catalytic combustor and steam reformer for a 5 kW solid oxide fuel cell system

    International Nuclear Information System (INIS)

    Kang, Sanggyu; Lee, Kanghun; Yu, Sangseok; Lee, Sang Min; Ahn, Kook-Young

    2014-01-01

    Highlights: • Proposes the scale-up strategy to develop a large-scale coupled reactor. • Investigation of performance of steam reformer coupled with catalytic combustor. • Experimental parameters are inlet temp., air excess ratio, SCR, fuel utilization. • Evaluation of the heat transfer distribution along the gas flow direction. • The mean value of methane conversion rate is approximately 93.4%. - Abstract: The methane (CH 4 ) conversion rate of a steam reformer can be increased by thermal integration with a catalytic combustor, called a coupled reactor. In the present study, a 5 kW coupled reactor has been developed based on a 1 kW coupled reactor in previous work. The geometric parameters of the space velocity, diameter and length of the coupled reactor selected from the 1 kW coupled reactor are tuned and applied to the design of the 5 kW coupled reactor. To confirm the scale-up strategy, the performance of 5 kW coupled reactor is experimentally investigated with variations of operating parameters such as the fuel utilization in the solid oxide fuel cell (SOFC) stack, the inlet temperature of the catalytic combustor, the excess air ratio of the catalytic combustor, and the steam to carbon ratio (SCR) in the steam reformer. The temperature distributions of coupled reactors are measured along the gas flow direction. The gas composition at the steam reformer outlet is measured to find the CH 4 conversion rate of the coupled reactor. The maximum value of the CH 4 conversion rate is approximately 93.4%, which means the proposed scale-up strategy can be utilized to develop a large-scale coupled reactor

  9. Estimation of Cadmium uptake by tobacco plants from laboratory leaching tests.

    Science.gov (United States)

    Marković, Jelena P; Jović, Mihajlo D; SmiÄiklas, Ivana D; Å ljivić-Ivanović, Marija Z; Smiljanić, Slavko N; Onjia, Antonije E; Popović, Aleksandar R

    2018-03-21

    The objective of the present study was to determine the impact of cadmium (Cd) concentration in the soil on its uptake by tobacco plants, and to compare the ability of diverse extraction procedures for determining Cd bioavailability and predicting soil-to-plant transfer and Cd plant concentrations. The pseudo-total digestion procedure, modified Tessier sequential extraction and six standard single-extraction tests for estimation of metal mobility and bioavailability were used for the leaching of Cd from a native soil, as well as samples artificially contaminated over a wide range of Cd concentrations. The results of various leaching tests were compared between each other, as well as with the amounts of Cd taken up by tobacco plants in pot experiments. In the native soil sample, most of the Cd was found in fractions not readily available under natural conditions, but with increasing pollution level, Cd amounts in readily available forms increased. With increasing concentrations of Cd in the soil, the quantity of pollutant taken up in tobacco also increased, while the transfer factor (TF) decreased. Linear and non-linear empirical models were developed for predicting the uptake of Cd by tobacco plants based on the results of selected leaching tests. The non-linear equations for ISO 14870 (diethylenetriaminepentaacetic acid extraction - DTPA), ISO/TS 21268-2 (CaCl 2 leaching procedure), US EPA 1311 (toxicity characteristic leaching procedure - TCLP) single step extractions, and the sum of the first two fractions of the sequential extraction, exhibited the best correlation with the experimentally determined concentrations of Cd in plants over the entire range of pollutant concentrations. This approach can improve and facilitate the assessment of human exposure to Cd by tobacco smoking, but may also have wider applicability in predicting soil-to-plant transfer.

  10. Status of SOFC development at Siemens

    Energy Technology Data Exchange (ETDEWEB)

    Drenckhahn, W.; Blum, L.; Greiner, H. [Siemens AG, Erlangen (Germany)

    1996-12-31

    The Siemens SOFC development programme reached an important milestone in June 1995. A stack operating with hydrogen and oxygen produced a peak power of 10.7 kW at a current density of 0.7 A/cm{sup 2} and was running for more than 1400 hours. The SOFC configuration is based on a flat metal separator plate using the multiple cell array design. Improved PENs, functional layer and joining technique were implemented. Based on this concept, a 100 kW plant was designed The SOFC development at Siemens has been started in 1990 after a two years preparation phase. The first period with the goal of the demonstration of a 1 kW SOFC stack operation ended in 1993. This important milestone was finally reached in the begin of 1994. The second project phase with the final milestone of a 20 kW module operation will terminate at the end of 1996. This result will form a basis for the next phase in which a 50 to 100 kW pilot plant will be built and tested.

  11. Acceptance test report for project C-157 ''T-Plant electrical upgrade''

    International Nuclear Information System (INIS)

    Jeppson, L.A.

    1997-01-01

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ''Acceptance Test Proceedure for Project C-157 'T Plant Electrical Upgrade''' The test was completed and approved without any problems or exceptions

  12. Acceptance test report for project C-157 ``T-Plant electrical upgrade``

    Energy Technology Data Exchange (ETDEWEB)

    Jeppson, L.A.

    1997-08-05

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ``Acceptance Test Proceedure for Project C-157 `T Plant Electrical Upgrade``` The test was completed and approved without any problems or exceptions.

  13. Potential biogas production from sewage sludge: A case study of the sewage treatment plant at Kwame Nkrumah university of science and technology, Ghana

    Energy Technology Data Exchange (ETDEWEB)

    Arthur, Richard [Energy Systems Engineering Department, Koforidua Polytechnic, Box KF 981, Koforidua (Ghana); Brew-Hammond, Abeeku [Faculty of Mechanical and Agricultural Engineering, Kwame Nkrumah University of Science and Technology, Private Mail Bag, Kumasi (Ghana)

    2010-07-01

    Biogas generation is one of the most promising renewable energy sources in Ghana. Anaerobic digestion is one of the effective ways of generating biogas. Anaerobic digestion is also a reliable method for wastewater treatment and the digestion the effluent can be used as fertilizer to enhance the fertility of the soil. This paper looks at the possibility of constructing a biogas plant at the KNUST sewage treatment plant tapping its feedstock the sludge at the Primary Sedimentation Tank to generate biogas. A laboratory experiment was done to determine the faecal sludge quality. The flowrate of the sludge was estimated based on the number of times the penstocks (valves) are operated to desludge the sewage which also depends on whether the university is on vacation (35.72 m3/day) or in session (71.44 m3/day). These parameters were used to determine the biogas potential of the sewage using 10, 20 and 30 days retention time for plant sizes of 540 m3, 1100m3 and 1600 m3 respectively. It was estimated that 170,719 m3, 341,858 m3 and 419,458 m3 of methane can be produced in a year and the power production was estimated to be 50 kW, 100 kW and 120 kW for the 540 m3, 1100m3 and 1600 m3 digester sizes respectively.

  14. Pilot plant for flue gas treatment - continuous operation tests

    International Nuclear Information System (INIS)

    Chmielewski, A.G.; Tyminski, B.; Iller, E.; Zimek, Z.; Licki, J.; Radzio, B.

    1995-01-01

    Tests of continuous operation have been performed on pilot plant at EPS Kaweczyn in the wide range of SO 2 concentration (500-3000 ppm). The bag filter has been applied for aerosol separation. The high efficiencies of SO 2 and NO x removal, approximately 90% were obtained and influenced by such process parameters as: dose, gas temperature and ammonia stoichiometry. The main apparatus of the pilot plant (e.g. both accelerators) have proved their reliability in hard industrial conditions. (Author)

  15. Test results for cables used in nuclear power plants by a new environmental testing method

    Energy Technology Data Exchange (ETDEWEB)

    Handa, Katsue; Fujimura, Shun-ichi; Hayashi, Toshiyasu; Takano, Keiji; Oya, Shingo

    1982-12-01

    In the nuclear power plants using PWRs or BWRs in Japan, environmental tests are provided, in which simulated LOCA conditions are considered so as to conform with Japanese conditions, and many cables which passed these tests are presently employed. Lately, the new environmental testing, in which a credible accident called MSLB (main steam line breakage) is taken into account, is investigated in PWR nuclear power plants, besides LOCA. This paper reports on the results of evaluating some PWR cables for this new environmental testing conditions. The several cables tested were selected out of PH cables (fire-retardant, ethylene propylene rubber insulated, chlorosulfonated polyethylene sheathed cables) as the cables for safety protecting circuits and to be used in containment vessels where the cables are to be exposed to severe environmental test conditions of 2 x 10/sup 8/ Rad ..gamma..-irradiation and simulated LOCA. All these cables have been accepted after the vertical tray burning test provided in the IEEE Standard 383. The new testing was carried out by sequentially applying thermal deterioration, ..gamma..-irradiation, and the exposure to steam (twice 300 s exposures to 190 deg C superheated steam). After completing each step, tensile strength, elongation, insulation resistance and breakdown voltage were measured, respectively. Every cable tested showed satisfactory breakdown voltage after the exposure to steam, thus it was decided to be acceptable. In future, it is required to investigate the influence of the rate of temperature rise on the cable to be tested in MSLB simulation.

  16. Simulation of Valve Operation for Flow Interrupt Test in Nuclear Power Plant

    International Nuclear Information System (INIS)

    Kim, Jae Hyung; Shin, Dae Yong; Shin, Dong Woo; Kim, Charn Jung; Lee, Jung Hee

    2012-01-01

    The valve used in nuclear power plant must be qualified for the function according to the KEPIC MF. The test valve must be selected by shape and size, which is given by KEPIC MF. In the functional test, the mathematical model for the valve operation is needed. The mathematical model must be verified by the test, whose method and procedure is defined in KEPIC MF. The lack of analytical technique has lead to the poor mathematical model, with which the functional test for the big valve is impossible with analytical method. Especially, the tank and rupture disk in the flow test is not considered and the result of the analysis is so different to the real one. In these days, the 3D model for the flow interrupt test makes more accurate analysis. And no facility about functional test reduces the research will for the nuclear power plant valve. For this problem, the test facility for the functional test of the valve and pump in nuclear power plant has been made until 2012. With the test facility, the research project related the valve were initiated in KIMM( Korea Institute of Machinery and Materials). And the joint project to SNU(Seoul National University) has been going on the numerical analysis for the valve in nuclear power plant. Using the commercial software and user subroutine, UDF, the co-simulation with multi-body dynamic and fluid flow analysis and the addition of tank and rupture disk to the user subroutine make possible to simulate the flow interrupt test numerically. This is not simple and regular analysis, which was introduced in user subroutine. In order to simulate the real situation, the engineering work, related mathematical model, and the programming in the user subroutine are needed. This study is on the making the mathematical model for the functional test of the valve in nuclear power plan. The functional test is the real test procedure and defined in KEPIC MF

  17. Economic viability study of micro-cogeneration plants at residential scale; Estudo de viabilidade economica de plantas de micro-cogeracao em escala residencial

    Energy Technology Data Exchange (ETDEWEB)

    Dutra, Jose Carlos Charamba; Ramalho e Soares, Ravi [Universidade Federal de Pernambuco (UFPE), Recife, PE (Brazil); Michalewicz, Jacek Stanislaw [Centro Federal de Educacao Tecnologica de Pernambuco (CEFET-PE), Recife, RN (Brazil)

    2008-07-01

    This paper presents the results of a technical and economical feasibility study for the use of micro cogeneration systems in residential scale, using natural gas as an energy source. It was considered two micro-cogeneration systems to meet demand of some types of fictitious establishment of commercial and residential plants, each with its advantages and disadvantages. The first system has as a main driving machine a micro turbine with a nominal capacity of 30 kw, the second one uses a gas motor-generator, with nominal capacity of 35 kw. (author)

  18. Remote maintenance demonstration tests at a pilot plant for high level waste vitrification

    International Nuclear Information System (INIS)

    Selig, M.

    1984-01-01

    The remote maintenance and replacement technique designed for a radioactive vitrification plant have been developed and tested in a full scale handling mockup and in an inactive pilot plants by the Central Engineering Department of the Karlsruhe Nuclear Research Center. As a result of the development work and the tests it has been proved that the remote maintenance technique and remote handling equipment can be used without any technical problems and are suited for application in a radioactive waste vitrification plant

  19. 105-KW Sandfilter Backwash Pit sludge volume calculation

    International Nuclear Information System (INIS)

    Dodd, E.N. Jr.

    1995-01-01

    The volume of sludge contained in the 100-KW Sandfilter Backwash Pit (SFBWP) was calculated from depth measurements of the sludge, pit dimension measurements and analysis of video tape recordings taken by an underwater camera. The term sludge as used in this report is any combination of sand, sediment, or corrosion products visible in the SFBWP area. This work was performed to determine baseline volume for use in determination of quantities of uranium and plutonium deposited in the pit from sandfilter backwashes. The SFBWP has three areas where sludge is deposited: (1) the main pit floor, (2) the transfer channel floor, and (3) the surfaces and structures in the SFBWP. The depths of sludge and the uniformity of deposition varies significantly between these three areas. As a result, each of the areas was evaluated separately. The total volume of sludge determined was 3.75 M 3 (132.2 ft 3 )

  20. System Description for the KW Basin Integrated Water Treatment System (IWTS) (70.3)

    International Nuclear Information System (INIS)

    DERUSSEAU, R.R.

    2000-01-01

    This is a description of the system that collects and processes the sludge and radioactive ions released by the spent nuclear fuel (SNF) processing operations conducted in the 105 KW Basin. The system screens, settles, filters, and conditions the basin water for reuse. Sludge and most radioactive ions are removed before the water is distributed back to the basin pool. This system is part of the Spent Nuclear Fuel Project (SNFP)

  1. Incoherent beam combining of fiber lasers by an all-fiber 7 × 1 signal combiner at a power level of 14 kW.

    Science.gov (United States)

    Lei, Chengmin; Gu, Yanran; Chen, Zilun; Wang, Zengfeng; Zhou, Pu; Ma, Yanxing; Xiao, Hu; Leng, Jinyong; Wang, Xiaolin; Hou, Jing; Xu, Xiaojun; Chen, Jinbao; Liu, Zejin

    2018-04-16

    We demonstrate an all-fiber 7 × 1 signal combiner with an output core diameter of 50 μm for high power incoherent beam combining of seven self-made Yb-doped single-mode fiber lasers around a wavelength of 1080 nm and output power of 2 kW. 14.1 kW combined output power is achieved with a total transmission efficiency of higher than 98.5% and a beam quality of M 2 = 5.37, which is close to the theoretical results based on finite-difference beam propagation technique. To the best of our knowledge, this is the highest output power ever reported for all-fiber structure beam combining generation, which indicates the feasibility and potential of >10 kW high brightness incoherent beam combining based on an all-fiber signal combiner.

  2. Development of a 400 kV 80 mA Cockcroft-Walton power supply and 12 kW isolation transformer systems for neutron generators

    Science.gov (United States)

    Lu, X.; Chen, S.; Zhang, Y.; Huang, Z.; Ma, Z.; Yao, Z.

    2017-06-01

    A 400 kV 80 mA Cockcroft-Walton power supply driven by 2.5 kHz frequency, and 12 kW isolation transformer systems are developed for an intense DD/DT neutron generator. The design, construction, and testing of the high voltage (HV) power supply and isolation transformer systems are detailed reported. The structure of step-up transformers can make the potential distribution uniform, and auxiliary coils of the isolation transformers can improve the power transmission efficiency significantly. The testing results show that the HV power supply can reach 400 kV, and the isolation transformer systems can withstand 400 kV voltages and its power transmission efficiency is about 98.1%.

  3. Potential safety enhancements to nuclear plant control: proof testing at EBR-II

    International Nuclear Information System (INIS)

    Lindsay, R.W.; Chisholm, G.H.

    1984-01-01

    Future changes in nuclear plant control and protective systems will reflect an evolutionary improvement through increased use of computers coupled with a better integration of man and machine. Before improvements can be accepted into the licensed commercial plant environment, significant testing must be accomplished to answer safety questions and to prove the worth of new ideas. The Experimental Breeder Reactor-II (EBR-II) is being used as a test-bed for both in-house development and testing for others in a DOE sponsored Man-Machine Integration program. The ultimate result of the development and testing would be a control system for which safety credit could be taken in the licensing process

  4. ENVIRONMENTAL TECHNOLOGY VERIFICATION REPORT, SWINE WASTE ELECTRIC POWER AND HEAT PRODUCTION--CAPSTONE 30KW MICROTURBINE SYSTEM

    Science.gov (United States)

    Under EPA’s Environmental Technology Verification program, which provides objective and scientific third party analysis of new technology that can benefit the environment, a combined heat and power system was evaluated based on the Capstone 30kW Microturbine developed by Cain Ind...

  5. Classification of nuclear plant cost to energy

    International Nuclear Information System (INIS)

    Long, G.A.

    1983-01-01

    In order to understand why the fixed-cost/variable-cost method of classifying nuclear plant costs can lead to rate discontinuities, the author must examine the factors which lead to the decision to build a nuclear power plant and the interrelationship between demand (KW) and energy (KWH). The problems and inequities associated with the nuclear plants can be avoided by recognizing that fixed costs are related to both demand and energy and by using a costing methodology which closely relates to the functional purpose of the plant. Generally, this leads to classifying fixed costs of nuclear plants primarily to the energy function in an embedded cost-of-service study and through either implicit or explicit recognition of fuel savings in a marginal cost study. The large rate discontinuities which occurred in the scenario can be resolved. Costs associated with demand or energy charges remain relatively stable compared to actual capacity costs and customers would not experience large changes in their bills due solely to a particular costing convention

  6. Laser cutting of thick steel plates with 30 kW fiber laser for nuclear decommissioning

    International Nuclear Information System (INIS)

    Tamura, Koji

    2015-01-01

    Laser cutting technologies of the thick steel plates for the nuclear decommissioning were developed with a 30 kW fiber laser. Plates of stainless steel and carbon steel more than 100 mm thick were successfully cut, indicating that this technology is promising for the application to the nuclear decommissioning. (author)

  7. Design and experimental investigation of a second harmonic 20 kW class 28 GHz gyrotron for evaluation of new emitter technologies

    Energy Technology Data Exchange (ETDEWEB)

    Malygin, Anton

    2016-07-01

    Gyrotrons are high-power mm-wave tubes. Here, the design, construction and experimental investigation of a 20 kW, 28 GHz gyrotron (2nd harmonic) are reported. This tube was designed to evaluate new emitters for future highly efficient and reliable fusion gyrotrons and for material processing applications. Following experimental results have been achieved in CW operation: 22.5 kW output power at 23.4 kV electron beam voltage and 2.23 A beam current with the world record efficiency of 43 %.

  8. PORTAFERM. A container-based small biogas plant with liquid manure as a feed material; PORTAFERM. Eine Containerbasierte Guelle-Kleinbiogasanlage

    Energy Technology Data Exchange (ETDEWEB)

    Klauss, M.; Matthes, J.

    2010-09-15

    Meanwhile, the energetic utilization of biogas is a substantial technology. The stock of biogas plants in Germany amounts nearly 4,500 in the year 2009. The average electrical output is approximately 370 kW. The most biogas facilities use regenerative raw materials as a feed material. With the second EEG amendment (EEG 2009), new incentives were set to the construction of biogas plants. A keyword here is the introduction of a liquid manure bonus. Under this aspect, the authors of the contribution under consideration report on a container-based biogas plant with liquid manure as a feed material. The test facility is equipped with a small cogeneration unit. In the basic operation, the produced masses of gas are sufficient for a daily operation between twelve to fourteen hours per day. With shortening the residence time gas volumes are produced which enable a continuous operation of the cogeneration units. Due to the large gas storage a peak load operation also is possible at a continuous gas production. A large advantage of this plant is that this plant does not have to run the total year.

  9. UF6 test loop for evaluation and implementation of international enrichment plant safeguards

    International Nuclear Information System (INIS)

    Cooley, J.N.; Fields, L.W.; Swindle, D.W. Jr.

    1987-06-01

    A functional test loop capable of simulating UF 6 flows, pressures, and pipe deposits characteristic of gas centrifuge enrichment plant piping has been designed and fabricated by the Enrichment Safeguards Program of Martin Marietta Energy Systems, Inc., for use by International Atomic Energy Agency (IAEA) at its Safeguards Analytical Laboratory in Seibersdorf, Austria. Purpose of the test loop is twofold: (1) to enable the IAEA to evaluate and to calibrate enrichment safeguards measurement instrumentation to be used in limited frequency-unannounced access (LFUA) inspection strategy measurements at gas centrifuge enrichment plants and (2) to train IAEA inspectors in the use of such instrumentation. The test loop incorporates actual sections of cascade header pipes from the centrifuge enrichment plants subject to IAEA inspections. The test loop is described, applications for its use by the IAEA are detailed, and results from an initial demonstration session using the test loop are summarized

  10. Performance evaluation and validation of 5 MWp grid connected solar photovoltaic plant in South India

    International Nuclear Information System (INIS)

    Sundaram, Sivasankari; Babu, Jakka Sarat Chandra

    2015-01-01

    Highlights: • A real time performance analysis with validation of the system is carried out for 5 MW p plant. • Dependence or interactions of input factors over performance responses are identified. • The topology of the PV system and the inverter technology is suggested for improved realization. • The average PV module, inverter and system efficiency are found to be 6.08%, 88.2% and 5.08%. • Average energy and exergy efficiency of the system is found to be 6.08% and 3.54%. - Abstract: The main objective of this paper is to present the validated annual performance analysis with the monitored results from a 5 MW p grid connected photovoltaic plant located in India at Sivagangai district in Tamilnadu. The total annual energy generated was 8495296.4 kW h which averages around 707941.4 kW h/month. In addition to the above, real time performance of the plant is validated through system software called RETscreen plus which employs regression analysis for validation. The measured annual average energy generated by the 5 MW p system is 24116.61 kW h/day which is appropriately close to the predicted annual average which was found to be 24055.25 kW h/day by RETscreen. The predicted responses are further justified by the value of statistical indicators such as mean bias error, root mean square error and mean percentage error. The annual average daily array yield, corrected reference yield, final yield, module efficiency, inverter efficiency and system efficiency were found to be 5.46 h/day, 5.128 h/day 4.810 h/day, 6.08%, 88.20% and 5.08% respectively. The overall absolute average daily capture loss and system loss of the particular system under study is 0.384 h/day and 0.65 h/day respectively. A comparison is also made between the performance indices of solar photovoltaic system situated at other locations from the literature’s published. Furthermore the effect of input factors over the output of the system is emphasized by regression coefficients obtained

  11. SOFC - Manufacture of stacks for test and demonstration related activities, stack and system tests and identification of end user requirements. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Jacobsen, Joachim; Primdahl, S.; Boegh Elmose, H.; Weineisen, H.; Richter, A.

    2008-11-15

    The aim of the project was to solve the technical challenges in relation to stack functionality in connection with operation of multi stack assemblies under realistic operating conditions. It was the intention to make a targeted effort with the aim of developing a high performance stack technology suitable for both small and large units. An important part of the project was the testing of stack assemblies up to 10 kW power range with relevant fuel and realistic operation condition in the test facility at HC OErstedvaerket. The manufacturing of stacks in the project was as planned a number of stacks (70 kW) for use in demonstration projects both for single stacks and for multi stack assemblies. The start up of the work on the SOFC test facility at HC OErstedsvaerket (HCV) was delayed due to a late delivery of the unit from the PSO 6385 project. A number of unforeseen events during the project have meant that the SOFC test facility at HCV has not until now been ready for performing tests. The experience gained from the operation of a 20 kW Alpha unit in a co-operation between TOFC and Waertsilae now provides an important contribution to the future multi stack assemblies. The work on identification of end user requirements has resulted in a number of different development priorities for the m-CHP and the Distributed Generation market segments. (au)

  12. Design and development of 3 MeV, 30 kW DC industrial electron accelerator at Electron Beam Centre, Kharghar

    International Nuclear Information System (INIS)

    Mittal, K.C.; Nanu, K.; Jain, A.

    2006-01-01

    High power electron beam accelerators are becoming an important tool for industrial radiation process applications. Keeping this in mind, a 3 MeV, 10 mA, 30 kW DC industrial electron accelerator has been designed and is in advanced stage of development at Electron Beam Center, Kharghar, Navi Mumbai. The operating range of this accelerator is 1 MeV to 3 MeV with maximum beam current of 10 mA. Electron beam at 5 keV is generated in electron gun with LaB 6 cathode and is injected into accelerating column at a vacuum of 10 -7 torr. After acceleration the beam is scanned and taken out in air through a 100 cm X 7 cm titanium window for radiation processing applications. The high voltage accelerating power supply is based on a capacitive coupled parallel fed voltage multiplier scheme operating at 120 kHz. A 50 kW oscillator feeds power to high voltage multiplier column. The electron gun, accelerating column and high voltage multiplier column are housed in accelerator tank filled with SF 6 gas insulation at 6 kg/cm 2 . The accelerator is located in a RCC building with product conveyor for handling products. A central computerized control system is adopted for operation of the accelerator. Accelerator is in the advance stage of commissioning. Many of the subsystems have been commissioned and tested. This paper describes the design details and current status of the accelerator and various subsystems. (author)

  13. 78 FR 67206 - Qualification Tests for Safety-Related Actuators in Nuclear Power Plants

    Science.gov (United States)

    2013-11-08

    ... Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Revision to regulatory guide; issuance..., ``Qualification Tests for Safety-Related Actuators in Nuclear Power Plants.'' This RG is being revised to provide... Operators Installed Inside the Containment of Nuclear Power Plants,'' dated January 1974. ADDRESSES: Please...

  14. Technical and environmental performance of 10 kW understocker boiler during combustion of biomass and conventional fuels

    Science.gov (United States)

    Junga, Robert; Wzorek, Małgorzata; Kaszubska, Mirosława

    2017-10-01

    This paper treats about the impact fuels from biomass wastes and coal combustion on a small boiler operation and the emission of pollutants in this process. Tests were performed in laboratory conditions on a water boiler with retort furnace and the capacity of 10 kW. Fuels from sewage sludge and agriculture wastes (PBZ fuel) and a blend of coal with laying hens mature (CLHM) were taken into account. The results in emission changes of NOx, CO2, CO and SO2 and operating parameters of the tested boiler during combustion were investigated. The obtained results were compared with corresponding results of flame coal (GFC). Combustion of the PBZ fuel turned out to be a stable process in the tested boiler but the thermal output has decreased in about 30% compared to coal combustion, while CO and NOx emission has increased. Similar effect was observed when 15% of the poultry litter was added to the coal. In this case thermal output has also decreased (in about 20%) and increase of CO and NOx emission was observed. As a conclusion, it can be stated that more effective control system with an adaptive air regulation and a modified heat exchanger could be useful in order to achieve the nominal power of the tested boiler.

  15. Technical and environmental performance of 10 kW understocker boiler during combustion of biomass and conventional fuels

    Directory of Open Access Journals (Sweden)

    Junga Robert

    2017-01-01

    Full Text Available This paper treats about the impact fuels from biomass wastes and coal combustion on a small boiler operation and the emission of pollutants in this process. Tests were performed in laboratory conditions on a water boiler with retort furnace and the capacity of 10 kW. Fuels from sewage sludge and agriculture wastes (PBZ fuel and a blend of coal with laying hens mature (CLHM were taken into account. The results in emission changes of NOx, CO2, CO and SO2 and operating parameters of the tested boiler during combustion were investigated. The obtained results were compared with corresponding results of flame coal (GFC. Combustion of the PBZ fuel turned out to be a stable process in the tested boiler but the thermal output has decreased in about 30% compared to coal combustion, while CO and NOx emission has increased. Similar effect was observed when 15% of the poultry litter was added to the coal. In this case thermal output has also decreased (in about 20% and increase of CO and NOx emission was observed. As a conclusion, it can be stated that more effective control system with an adaptive air regulation and a modified heat exchanger could be useful in order to achieve the nominal power of the tested boiler.

  16. Use of sewage treatment biogas for electric generation using an 30 kW (ISO); Uso do biogas de tratamento de esgoto, para geracao de energia eletrica, utilizando-se de uma microturbina de 30 kW (ISO)

    Energy Technology Data Exchange (ETDEWEB)

    Coelho, Suani T.; Velazquez, Silvia M.S.G.; Martins, Osvaldo S.; Costa, David F. [Centro Nacional de Referencia em Biomassa (CENBIO), Sao Paulo, SP (Brazil); Bacic, Antonio C.K. [Companhia de Saneamento Basico do Estado de Sao Paulo (SABESP), SP (Brazil)

    2004-07-01

    This paper intends to present some considerations directed to electricity generation with 30 kW (ISO) micro turbines, using biogas generated by sewage treatment process in SABESP (Basic Sanitation Company of Sao Paulo State), located at Barueri, Brazil. This project, pioneer in Latin America, is being accomplished together with BUN - Biomass Users Network of Brazil (proponent), in association with CENBIO - The Brazilian Reference Center on Biomass (executer), with patronage of FINEP / CT-ENERG (financial backer), by means of ACCORD No: 23.01.0653.00, regarding to ENERG-BIOG Project - 'Installation and Tests of an Electric Energy Generation Demonstration Unit from Biogas Sewage Treatment'. Thus, the contribution of this paper will be in the presentation of the project results, related with the exploitation of sewer biogas for power generation, as well as bigger details about purification, compression and electricity generation systems (biogas micro turbine) used in the installation. (author)

  17. Testing in power plant construction as well as in the petrochemical and chemical industry

    International Nuclear Information System (INIS)

    Riess, N.; Schittko, H.

    1978-01-01

    In general, the upgrading of requirements for the most different fields of engineering is also characterized by a corresponding effort in testing. In this context especially nondestructive tests of materials are of outstanding importance. In the fields of power plant construction (among others, components for nuclear power plants) as well as petrochemical and chemical industry considered here, almost all nondestructive test methods are applied. This paper discusses not so much theoretical testing problems, but rather test objects as well as specifications and testing equipment. (orig./HP) [de

  18. Test results for cables used in nuclear power plants by a new environmental testing method

    International Nuclear Information System (INIS)

    Handa, Katsue; Fujimura, Shun-ichi; Hayashi, Toshiyasu; Takano, Keiji; Oya, Shingo

    1982-01-01

    In the nuclear power plants using PWRs or BWRs in Japan, environmental tests are provided, in which simulated LOCA conditions are considered so as to conform with Japanese conditions, and many cables which passed these tests are presently employed. Lately, the new environmental testing, in which a credible accident called MSLB (main steam line breakage) is taken into account, is investigated in PWR nuclear power plants, besides LOCA. This paper reports on the results of evaluating some PWR cables for this new environmental testing conditions. The several cables tested were selected out of PH cables (fire-retardant, ethylene propylene rubber insulated, chlorosulfonated polyethylene sheathed cables) as the cables for safety protecting circuits and to be used in containment vessels where the cables are to be exposed to severe environmental test conditions of 2 x 10 8 Rad γ-irradiation and simulated LOCA. All these cables have been accepted after the vertical tray burning test provided in the IEEE Standard 383. The new testing was carried out by sequentially applying thermal deterioration, γ-irradiation, and the exposure to steam (twice 300 s exposures to 190 deg C superheated steam). After completing each step, tensile strength, elongation, insulation resistance and breakdown voltage were measured, respectively. Every cable tested showed satisfactory breakdown voltage after the exposure to steam, thus it was decided to be acceptable. In future, it is required to investigate the influence of the rate of temperature rise on the cable to be tested in MSLB simulation. (Wakatsuki, Y.)

  19. A novel DWDM method to design a 100-kW Laser

    Science.gov (United States)

    Basu, Santanu

    2010-02-01

    In this paper, I will present the design analysis of a novel concept that may be used to generate a diffraction-limited beam from an aperture so that as much as 450 kW of laser power can be efficiently deposited on a diffraction-limited spot at a range. The laser beam will be comprised of many closely spaced wavelength channels as in a DWDM. The technique relies on the ability of an angular dispersion amplifier to multiplex a large number of high power narrow frequency lasers, wavelengths of which may be as close as 0.4 nm.

  20. Magnetic Measurement of the 10 kW, IR FEL Dipole Magnets

    International Nuclear Information System (INIS)

    Tommy Hiatt; Kenneth Baggett; J. Beck; George Biallas; David Douglas; Kevin Sullivan; C. Tennant

    2003-01-01

    Magnetic measurements have been performed on several families of dipoles for the 10 kW IR-FEL presently under construction at the Thomas Jefferson National Accelerator Facility. The requirements for these magnets include varying field strengths, large horizontal apertures and parts in 10,000 field homogeneity as well as setability of core and integrated field. Measurements were made to quantify the magnets according to these requirements and to determine the hysteresis protocol, ramp rate dependence, and field clamp settings that are used. This paper will describe the results of these measurements and the procedures used to accomplish them

  1. Analysis of essential elements in medicinal plants and their respective soils by neutron activation analysis

    International Nuclear Information System (INIS)

    Ratna Raju, M.; Madhusudhana Rao, P.V.; Vijayalakshmi, D.; Raju, M.K.; Brahmaji Rao, J.S.; Seshadreesan, N.P.; Venkatasubramani, C.R.

    2014-01-01

    In this study, the essential elements for humans in selected medicinal plants and their respective growing soils are measured by Neutron Activation Analysis. The concentrations of Na, K, Fe, Br, Al, Mn, Cl, Ca and Mg were analyzed using 20 kW KAMINI Reactor, Indira Gandhi Centre for Atomic Research (IGCAR), Kalpakkam. Results show that justification for the usage of these medicinal plants in the treatment of various diseases. Moreover, these results can be useful for preparing dosage of the herbal formulations. (author)

  2. SAS3A analysis of natural convection boiling behavior in the Sodium Boiling Test Facility

    International Nuclear Information System (INIS)

    Klein, G.A.

    1979-01-01

    An analysis of natural convection boiling behavior in the Sodium Boiling Test (SBT) Facility has been performed using the SAS3A computer code. The predictions from this analysis indicate that stable boiling can be achieved for extensive periods of time for channel powers less than 1.4 kW and indicate intermittent dryout at higher powers up to at least 1.7 kW. The results of this anaysis are in reasonable agreement with the SBT Facility test results

  3. Mathematical investigation of the possibility of a power increase of the subcritical assembly in Dubna (SAD) up to 100 kW

    International Nuclear Information System (INIS)

    Petrochenkov, S.A.; Shvetsov, V.N.; Polanski, A.

    2007-01-01

    We present the results of Monte-Carlo modeling of the experimental accelerator-driven electronuclear system composed of the subcritical assembly and DLNP JINR Phasotron. The expected thermal power of the subcritical assembly in Dubna (SAD) is about 30 kW. The possibility of assembly power increase without changes in design and basic elements is considered. The proposed assembly upgrade gives power increase up to 100 kW. It is of importance that proposed upgrade operations can be performed both before and after the run with nominal power and partial fulfillment of a basic experimental program

  4. Current progress in the design and setup of a SOFC/GT hybrid power plant

    OpenAIRE

    Schnegelberger, Christian; Henke, Moritz; Tomberg, Marius; Heddrich, Marc; Friedrich, K. Andreas

    2017-01-01

    The German Aerospace Center (DLR) is setting up a hybrid power plant with 30 kW electrical power output. It consists of a SOFC and a micro gas turbine (MGT). The hybrid power plant can reach electrical system efficiencies greater than 60 % throughout a wide operating range. Due to the SOFC’s high operation temperature and incomplete fuel utilisation, the exhaust gas will always contain usable energy. The MGT will use this energy to provide compressed and preheated air for the SOFC and ge...

  5. USING POTATOES IN PROPAGATION TESTS FOR NONTARGET PLANT EFFECTS

    Science.gov (United States)

    Current tests required for pesticide registration under the FIFRA only investigate seedling emergence and early growth. Previous research with sulfonylurea (SU) herbicides has shown that significant impacts can occur to plant reproduction with little or no visible effect on vege...

  6. North Plant co-generation project for South Davis County Sewer Improvement District

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, L.S. [Aqua Environmental Services, Inc., Bountiful, UT (United States)

    1993-12-31

    In the summer of 1988, the South Davis County Sewer Improvement District (SDCSID) learned of a grant/loan program being administered by the Utah State Department of Energy(DOE) for projects that demonstrate new and innovative ways of conserving energy or utilizing renewable energy sources. The SDCSID applied for and received from the DOE both a grant and a no-interest loan to finance half of the cost of a co-generation project at the North Wastewater Treatment Plant. This co-generation project utilizes methane gas, a by-product of the anaerobic digestion process, to generate both electricity and heat that is used at the plant. The SDCSID calculated that at the current anaerobic gas production rate, a 140 KW engine generator could be run almost 24 hours a day. Approximately 75% of the current electrical needs at the North Plant are supplied by the 140 KW engine generator. Also, all of the heat necessary to raise the temperature of the incoming sludge to 95{degrees}F, and to heat four large buildings is supplied from the heat recovery system of the engine. The system utilizes an induction type generator to supply electricity, which is somewhat simpler to design and less expensive to install than a synchronous type system. An induction system utilizes the Electrical Utility`s incoming power to excite the generator to correct the phase so that is can be used by the loads in the plant. In addition, the SDCSID installed a second identical engine generator as a back-up and to peak shave. Plant effluent is used to cool the engines instead of air-cooling through radiators.

  7. Preparation and testing of plant seed meal-based wood adhesives.

    Science.gov (United States)

    He, Zhongqi; Chapital, Dorselyn C

    2015-03-05

    Recently, the interest in plant seed meal-based products as wood adhesives has steadily increased, as these plant raw materials are considered renewable and environment-friendly. These natural products may serve as alternatives to petroleum-based adhesives to ease environmental and sustainability concerns. This work demonstrates the preparation and testing of the plant seed-based wood adhesives using cottonseed and soy meal as raw materials. In addition to untreated meals, water washed meals and protein isolates are prepared and tested. Adhesive slurries are prepared by mixing a freeze-dried meal product with deionized water (3:25 w/w) for 2 hr. Each adhesive preparation is applied to one end of 2 wood veneer strips using a brush. The tacky adhesive coated areas of the wood veneer strips are lapped and glued by hot-pressing. Adhesive strength is reported as the shear strength of the bonded wood specimen at break. Water resistance of the adhesives is measured by the change in shear strength of the bonded wood specimens at break after water soaking. This protocol allows one to assess plant seed-based agricultural products as suitable candidates for substitution of synthetic-based wood adhesives. Adjustments to the adhesive formulation with or without additives and bonding conditions could optimize their adhesive properties for various practical applications.

  8. Non-destructive testing for plant life assessment

    International Nuclear Information System (INIS)

    2005-01-01

    The International Atomic Energy Agency (IAEA) is promoting industrial applications of nondestructive testing (NDT) technology, which includes radiography testing (RT) and related methods, to assure safety and reliability of operation of industrial facilities and processes. NDT technology is essentially needed for improvement of the quality of industrial products, safe performance of equipment and plants, including safety of metallic and concrete structures and constructions. The IAEA is playing an important role in promoting the NDT use and technology support to Member States, in harmonisation for training and certification of NDT personnel, and in establishing national accreditation and certifying bodies. All these efforts have led to a stage of maturity and self sufficiency in numerous countries especially in the field of training and certification of personnel, and in provision of services to industries. This has had a positive impact on the improvement of the quality of industrial goods and services. NDT methods are primarily used for detection, location and sizing of surface and internal defects (in welds, castings, forging, composite materials, concrete and many more). Various NDT methods are applied for preventive maintenance (aircraft, bridge), for the inspection of raw materials, half-finished and finished products, for in-service-inspection and for plant life assessment studies. NDT is essential for quality control of the facilities and products, and for fitness - for purpose assessment (so-called plant life assessment). NDT evaluates remaining operation life of plant components (processing lines, pipes, vessels) providing an accurate diagnosis that allows predicting extended life operation beyond design life. Status and trends on the NDT for plant life assessment have been discussed in many IAEA meetings related with NDT development, training and education. Experts have largely demonstrated that, using NDT methods, a comprehensive assessment of the life

  9. Program outline of seismic fragility capacity tests on nuclear power plant equipment

    International Nuclear Information System (INIS)

    Lijima, T.; Abe, H.; Fujita, T.

    2004-01-01

    A seismic probabilistic safety assessment (PSA) is an available method to evaluate residual risk of nuclear plant that is designed with definitive seismic design condition. Seismic fragility capacity data are necessary for seismic PSA, but we don't have sufficient data of active components of nuclear plants in Japan. This paper describes a plan of seismic fragility capacity tests on nuclear power plant equipment. The purpose of those tests is to obtain seismic fragility capacity of important equipment from a safety design point of view. And the equipment for the fragility capacity tests were selected considering effect on core damage frequency (CDF) that was evaluated by our preliminary seismic PSA. Consequently horizontal shaft pump, electric cabinets, Control Rod Drive system (CRD system) of BWR and PWR plant and vertical shaft pump were selected. The seismic fragility capacity tests are conducted from phase-1 to phase-3, and horizontal shaft pump and electric cabinets are tested on phase-1. The fragility capacity test consists of two types of tests. One is actual equipment test and another is element test. On actual equipment test, a real size model is tested with high-level seismic motion, and critical acceleration and failure mode are investigated. Regarding fragility test phase-1, we selected typical type horizontal shaft pump and electric cabinets for the actual equipment test. Those were Reactor Building Closed Cooling Water (RCW) Pump and eight kinds of electric cabinets such as relay cabinet, motor control center. On the test phase-1, maximum input acceleration for the actual equipment test is intended to be 6-G-force. Since the shaking table of TADOTSU facility did not have capability for high acceleration, we made vibration amplifying system. In this system, amplifying device is mounted on original shaking table and it moves in synchronization with original table. The element test is conducted with many samples and critical acceleration, median and

  10. Report on the results of the FY 1999 R and D of polymer electrolyte fuel cells. Development of the power system technology (Development of high voltage several 10 kW class dispersed generation system); 1999 nendo kotai kobunshigata nenryo denchi no kenkyu kaihatsu seika hokokusho. Hatsuden system gijutsu no kaihatsu (koden'atsugata suju kW kyu bunsan dengen system no kaihatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The paper described the results of the FY 1999 development of polymer electrolyte fuel cell and several 10 kW class dispersed generation system. The humidification of the cell body is the internal humidification method in which water is directly supplied to cell, which makes the cell life long. The cooling using latent heat of vaporization of the water supplied makes the temperature distribution inside the cell face homogeneous. In the test for long life, the system was stably operated at voltage lowering speed of 11mV/1000h. The optimization of water supply structure in the stack increases the latent heat cooling amount and makes the temperature distribution inside the cell face homogeneous. The reduction of CO concentration in reformed gas is extremely important for improvement of cell performance and long-term stabilization of cell voltage. By the two-stage structure selective oxidation device, the CO concentration at inlet, 5,000 ppm, can be reduced to below 10 ppm at outlet. In the demonstrative experiment on the several 10 kW class dispersed generation system, efforts for reduction in size of structural equipment and package were made, and a possible size of 200*150*180cm was obtained. Based on the chart of 30kW class system flow, the heat material balance was analyzed, and the power generation efficiency of 40% at a.c. sending end and overall efficiency of 80% were confirmed. (NEDO)

  11. A. Vessel for pressure generation, B. Battery of the electrical heater P=30kW, Project of the main loop for irradiation of enriched UO{sub 2}, Zad. E-14-37-00-29, Vol. IV; A. Sud za generaciju pritiska; B. Baterija el. grejaca snage P=30kW, Projekat glavnog kola petlje za ozracivanje obogacenog UO{sub 2}, Zad. E-14-37-00-29, Album IV

    Energy Technology Data Exchange (ETDEWEB)

    Anastasijevic, P; Pavlovic, A [Institute of Nuclear Sciences Boris Kidric, Laboratorija za eksploataciju reaktora, Vinca, Beograd (Serbia and Montenegro)

    1968-11-15

    Vessel for pressure generation and the 30kW battery of the electrical heater belong to the Project of the main loop for irradiation of enriched UO{sub 2}. These two components of the irradiation loop are designed to attain and maintain the pressure and temperature of the cooling fluid. This report includes the description of the construction of the vessel for pressure generation and the battery of the electrical heater, control mechanical and electric calculations, needed tests, materials specifications, and overall and detailed engineering drawings. Sud za generaciju pritiska i baterija el. grejaca snage P=30kW pripadaju projektu glavnog kola petlje za ozracivanje obogacenog UO{sub 2}. Ova dva elementa glavnog kola petlje omogucavaju i odrzavaju pritisak i temperaturu rashadnog fluida. Ovaj izvestaj sadrzi opis konstrukcije suda za generaciju pritiska i baterije elektricnog grejaca, kontrolne mehanicke i elektricne proracune, zahtevana ispitivanja, specifikaciju materijala, sklopni crtez i detalje.

  12. Sequential Design of Experiments to Maximize Learning from Carbon Capture Pilot Plant Testing

    Energy Technology Data Exchange (ETDEWEB)

    Soepyan, Frits B.; Morgan, Joshua C.; Omell, Benjamin P.; Zamarripa-Perez, Miguel A.; Matuszewski, Michael S.; Miller, David C.

    2018-02-06

    Pilot plant test campaigns can be expensive and time-consuming. Therefore, it is of interest to maximize the amount of learning and the efficiency of the test campaign given the limited number of experiments that can be conducted. This work investigates the use of sequential design of experiments (SDOE) to overcome these challenges by demonstrating its usefulness for a recent solvent-based CO2 capture plant test campaign. Unlike traditional design of experiments methods, SDOE regularly uses information from ongoing experiments to determine the optimum locations in the design space for subsequent runs within the same experiment. However, there are challenges that need to be addressed, including reducing the high computational burden to efficiently update the model, and the need to incorporate the methodology into a computational tool. We address these challenges by applying SDOE in combination with a software tool, the Framework for Optimization, Quantification of Uncertainty and Surrogates (FOQUS) (Miller et al., 2014a, 2016, 2017). The results of applying SDOE on a pilot plant test campaign for CO2 capture suggests that relative to traditional design of experiments methods, SDOE can more effectively reduce the uncertainty of the model, thus decreasing technical risk. Future work includes integrating SDOE into FOQUS and using SDOE to support additional large-scale pilot plant test campaigns.

  13. A study of statistical tests for near-real-time materials accountancy using field test data of Tokai reprocessing plant

    International Nuclear Information System (INIS)

    Ihara, Hitoshi; Nishimura, Hideo; Ikawa, Koji; Miura, Nobuyuki; Iwanaga, Masayuki; Kusano, Toshitsugu.

    1988-03-01

    An Near-Real-Time Materials Accountancy(NRTA) system had been developed as an advanced safeguards measure for PNC Tokai Reprocessing Plant; a minicomputer system for NRTA data processing was designed and constructed. A full scale field test was carried out as a JASPAS(Japan Support Program for Agency Safeguards) project with the Agency's participation and the NRTA data processing system was used. Using this field test data, investigation of the detection power of a statistical test under real circumstances was carried out for five statistical tests, i.e., a significance test of MUF, CUMUF test, average loss test, MUF residual test and Page's test on MUF residuals. The result shows that the CUMUF test, average loss test, MUF residual test and the Page's test on MUF residual test are useful to detect a significant loss or diversion. An unmeasured inventory estimation model for the PNC reprocessing plant was developed in this study. Using this model, the field test data from the C-1 to 85 - 2 campaigns were re-analyzed. (author)

  14. General Atomic reprocessing pilot plant: description and results of initial testing

    International Nuclear Information System (INIS)

    1977-12-01

    In June 1976 General Atomic completed the construction of a reprocessing head-end cold pilot plant. In the year since then, each system within the head end has been used for experiments which have qualified the designs. This report describes the equipment in the plant and summarizes the results of the initial phase of reprocessing testing

  15. Inferences from new plant design from fast flux test facility operation

    International Nuclear Information System (INIS)

    Peterson, R.E.; Peckinpaugh, C.L.; Simpson, D.E.

    1985-04-01

    Experience gained through operation of the Fast Flux Test Facility (FFTF) is now sufficiently extensive that this experience can be utilized in designing the next generation of liquid metal fast reactors. Experience with FFTF core and plant components is cited which can result in design improvements to achieve inherently safe, economic reactor plants. Of particular interest is the mixed oxide fuel system which has demonstrated large design margins. Other plant components have also demonstrated high reliability and offer capital cost reduction opportunities through design simplifications. The FFTF continues to be a valuable US resource which affords prototypic development and demonstration, contributing to public acceptability of future plants

  16. Techno-Economic analysis of solar photovoltaic power plant for small scale fish processing in Kota Langsa - a case study

    Science.gov (United States)

    Widodo, S. B.; Hamdani; Rizal, T. A.; Pambudi, N. A.

    2018-02-01

    In Langsa, fisheries are the sector leaders by fulfilling a capacity of about 6,050 tons per year and on the other hand, fish-aquaculture reaches 1,200 tons per year on average. The fish processing is conducted through catches and aquaculture. The facilities on which this processing takes place are divided into an ice factory unit, a gutting and cutting unit, a drying unit and a curing unit. However, the energy and electricity costs during the production process has become major constraint because of the increase in the fishermen’s production and income. In this study, the potential and cost-effectiveness of photovoltaic solar power plant to meet the energy demands of fish processing units have been analysed. The energy requirements of fish processing units have reached an estimate of 130 kW, while the proposed design of solar photovoltaic electricity generation is of 200 kW in an area of 0,75 hectares. In this analysis, given the closeness between the location of the processing units and the fish supply auctions, the assumption is made that the photovoltaic plants (OTR) were installed on the roof of the building as compared to the solar power plants (OTL) installed on the outside of the location. The results shows that the levelized cost of OTR instalation is IDR 1.115 per kWh, considering 25 years of plant life-span at 10% of discount rate, with a simple payback period of 13.2 years. OTL levelized energy, on the other hand, is at IDR 997.5 per kWh with a simple payback period of 9.6 years. Blood is an essential component of living creatures in the vascular space. For possible disease identification, it can be tested through a blood test, one of which can be seen from the form of red blood cells. The normal and abnormal morphology of the red blood cells of a patient is very helpful to doctors in detecting a disease. With the advancement of digital image processing technology can be used to identify normal and abnormal blood cells of a patient. This research used

  17. Guidelines for Electromagnetic Interference Testing of Power Plant Equipment: Revision 3 to TR-102323

    International Nuclear Information System (INIS)

    Cunningham, J.; Shank, J.

    2004-01-01

    To continue meeting safety and reliability requirements while controlling costs, operators of nuclear power plants must be able to replace and upgrade equipment in a cost-effective manner. One issue that has been problematic for new plant equipment and especially for digital instrumentation and control (I and C) systems in recent years is electromagnetic compatibility (EMC). The EMC issue usually involves testing to show that critical equipment will not be adversely affected by electromagnetic interference (EMI) in the plant environment. This guide will help nuclear plant engineers address EMC issues and qualification testing in a consistent, comprehensive manner

  18. Guidelines for Electromagnetic Interference Testing of Power Plant Equipment: Revision 3 to TR-102323

    Energy Technology Data Exchange (ETDEWEB)

    J. Cunningham and J. Shank

    2004-11-01

    To continue meeting safety and reliability requirements while controlling costs, operators of nuclear power plants must be able to replace and upgrade equipment in a cost-effective manner. One issue that has been problematic for new plant equipment and especially for digital instrumentation and control (I&C) systems in recent years is electromagnetic compatibility (EMC). The EMC issue usually involves testing to show that critical equipment will not be adversely affected by electromagnetic interference (EMI) in the plant environment. This guide will help nuclear plant engineers address EMC issues and qualification testing in a consistent, comprehensive manner.

  19. Monitoring support system for nuclear power plant

    International Nuclear Information System (INIS)

    Higashikawa, Yuichi; Kubota, Rhuji; Tanaka, Keiji; Takano, Yoshiyuki

    1996-01-01

    The nuclear power plants in Japan reach to 49 plants and supply 41.19 million kW in their installed capacities, which is equal to about 31% of total electric power generation and has occupied an important situation as a stable energy supplying source. As an aim to keeping safe operation and working rate of the power plants, various monitoring support systems using computer technology, optical information technology and robot technology each advanced rapidly in recent year have been developed to apply to the actual plants for a plant state monitoring system of operators in normal operation. Furthermore, introduction of the emergent support system supposed on accidental formation of abnormal state of the power plants is also investigated. In this paper, as a monitoring system in the recent nuclear power plants, design of control panel of recent central control room, introduction to its actual plant and monitoring support system in development were described in viewpoints of improvement of human interface, upgrade of sensor and signal processing techniques, and promotion of information service technique. And, trend of research and development of portable miniature detector and emergent monitoring support system are also introduced in a viewpoint of labor saving and upgrade of the operating field. (G.K.)

  20. Test phase plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1993-03-01

    The US Department of Energy (DOE) has prepared this Test Phase Plan for the Waste Isolation Pilot Plant to satisfy the requirements of Public Law 102-579, the Waste Isolation Pilot Plant (WIPP) Land Withdrawal Act (LWA). The Act provides seven months after its enactment for the DOE to submit this Plan to the Environmental Protection Agency (EPA) for review. A potential geologic repository for transuranic wastes, including transuranic mixed wastes, generated in national-defense activities, the WIPP is being constructed in southeastern New Mexico. Because these wastes remain radioactive and chemically hazardous for a very long time, the WIPP must provide safe disposal for thousands of years. The DOE is developing the facility in phases. Surface facilities for receiving waste have been built and considerable underground excavations (2150 feet below the surface) that are appropriate for in-situ testing, have been completed. Additional excavations will be completed when they are required for waste disposal. The next step is to conduct a test phase. The purpose of the test phase is to develop pertinent information and assess whether the disposal of transuranic waste and transuranic mixed waste in the planned WIPP repository can be conducted in compliance with the environmental standards for disposal and with the Solid Waste Disposal Act (SWDA) (as amended by RCRA, 42 USC. 6901 et. seq.). The test phase includes laboratory experiments and underground tests using contact-handled transuranic waste. Waste-related tests at WIPP will be limited to contact-handled transuranic and simulated wastes since the LWA prohibits the transport to or emplacement of remote-handled transuranic waste at WIPP during the test phase

  1. 76 FR 52355 - NUREG-1482, Revision 2, “Guidelines for Inservice Testing at Nuclear Power Plants, Draft Report...

    Science.gov (United States)

    2011-08-22

    ... Testing at Nuclear Power Plants, Draft Report for Comment'' AGENCY: Nuclear Regulatory Commission. ACTION... Testing at Nuclear Power Plants, Draft Report for Comment,'' and subtitled ``Inservice Testing of Pumps... Examination and Testing of Dynamic Restraints (Snubbers) at Nuclear Power Plants'' is available electronically...

  2. DOE LeRC photovoltaic systems test facility

    Science.gov (United States)

    Cull, R. C.; Forestieri, A. F.

    1978-01-01

    The facility was designed and built and is being operated as a national facility to serve the needs of the entire DOE National Photovoltaic Program. The object of the facility is to provide a place where photovoltaic systems may be assembled and electrically configured, without specific physical configuration, for operation and testing to evaluate their performance and characteristics. The facility as a breadboard system allows investigation of operational characteristics and checkout of components, subsystems and systems before they are mounted in field experiments or demonstrations. The facility as currently configured consist of 10 kW of solar arrays built from modules, two inverter test stations, a battery storage system, interface with local load and the utility grid, and instrumentation and control necessary to make a flexible operating facility. Expansion to 30 kW is planned for 1978. Test results and operating experience are summaried to show the variety of work that can be done with this facility.

  3. Physics design of a 10 MeV, 6 kW travelling wave electron linac for ...

    Indian Academy of Sciences (India)

    2016-10-11

    Oct 11, 2016 ... We present the physics design of a 10 MeV, 6 kW S-band (2856 MHz) electron linear ... linac (in contrast with standing wave linac) is that it accepts the RF power over a band of frequencies. Three- ... structures are preferred for relatively higher energy ... klystron in a TW linac, which results in cost reduction.

  4. Baseline test data for the EVA electric vehicle. [low energy consumption automobiles

    Science.gov (United States)

    Harhay, W. C.; Bozek, J.

    1976-01-01

    Two electric vehicles from Electric Vehicle Associates were evaluated for ERDA at the Transportation Research Center of Ohio. The vehicles, loaded to a gross vehicle weight of 3750 pounds, had a range of 56.3 miles at a steady speed of 25 mph and a 27.4 miles range during acceleration-deceleration tests to a top speed of 30 mph. Energy consumption varied from 0.48 kw-hr/mi. to 0.59 kw-hr/mi.

  5. Achievement report on the development of solar thermal electric power plant technologies. Annex; Taiyonetsu hatsuden plant gijutsu kaihatsu seika hokokusho. Fuzoku shiryo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1985-07-01

    The two solar thermal electric power pilot plants are of the tower concentration type and the flat/curved surface concentration type. For the first time in the world, they succeeded in operating at a rated output of 1,000kW in August and September, 1981, respectively. Sunshine was inputted at an unstable rate, and the plants were operated under various load patterns. Studies were conducted and an optimum operating technique is established. Since designing, construction, and operation were carried for two types of pilot plants, quantities of useful data were collected through a variety of experiences. Valuable hints and design data were provided for use in the construction of full-scale power plants in the future. Element units developed for the plants were high-reflectance mirrors, high-precision tracking mechanisms, solar heat collectors of the cavity type and paraboloidal type, and molten salt heat accumulators. The tower concentration type plant exhibits a power generation efficiency of 16-17% and an overall plant efficiency of 3.1-4.4%. The maximum overall efficiency a month is 3.9% with the flat/curved surface concentration type plant. (NEDO)

  6. SPS RF System Amplifier plant

    CERN Multimedia

    1977-01-01

    The picture shows a 2 MW, 200 MHz amplifier plant with feeder lines. The main RF-system of the SPS comprises four cavities: two of 20 m length and two of 16.5 m length. They are all installed in one long straight section (LSS 3). These cavities are of the travelling-wave type operating at a centre frequency of 200.2 MHz. They are wideband, filling time about 700 ns and untuned. The power amplifiers, using tetrodes are installed in a surface building 200 m from the cavities. Initially only two cavities were installed, a third cavity was installed in 1978 and a forth one in 1979. The number of power amplifiers was also increased: to the first 2 MW plant a second 2 MW plant was added and by end 1979 there were 8 500 kW units combined in pairs to feed each of the 4 cavities with up to about 1 MW RF power, resulting in a total accelerating voltage of about 8 MV. See also 7412016X, 7412017X, 7411048X.

  7. Culinary Spice Plants in Dietary Supplement Products and Tested in Clinical Trials.

    Science.gov (United States)

    Saldanha, Leila G; Dwyer, Johanna T; Betz, Joseph M

    2016-03-01

    Dried plant parts used as culinary spices (CSs) in food are permitted as dietary ingredients in dietary supplements (DSs) within certain constraints in the United States. We reviewed the amounts, forms, and nutritional support (structure/function) claims of DSs that contain CS plants listed in the Dietary Supplement Label Database (DSLD) and compared this label information with trial doses and health endpoints for CS plants that were the subject of clinical trials listed in clinicaltrials.gov. According to the DSLD, the CS plants occurring most frequently in DSs were cayenne, cinnamon, garlic, ginger, pepper, rosemary, and turmeric. Identifying the botanical species, categorizing the forms used, and determining the amounts from the information provided on DS labels was challenging. CS plants were typically added as a component of a blend, as the powered biomass, dried extracts, and isolated phytochemicals. The amounts added were declared on about 55% of the labels, rendering it difficult to determine the amount of the CS plant used in many DSs. Clinicaltrials.gov provided little information about the composition of test articles in the intervention studies. When plant names were listed on DS labels and in clinical trials, generally the common name and not the Latin binomial name was given. In order to arrive at exposure estimates and enable researchers to reproduce clinical trials, the Latin binomial name, form, and amount of the CS plant used in DSs and tested in clinical trials must be specified. © 2016 American Society for Nutrition.

  8. Thermodynamic analysis of SOFC (solid oxide fuel cell) - Stirling hybrid plants using alternative fuels

    DEFF Research Database (Denmark)

    Rokni, Masoud

    2013-01-01

    A novel hybrid power system (∼10 kW) for an average family home is proposed. The system investigated contains a solid oxide fuel cell (SOFC) on top of a Stirling engine. The off-gases produced in the SOFC cycle are fed to a bottoming Stirling engine, at which additional power is generated...... to that of a stand-alone Stirling engine or SOFC plant. For the combined SOFC and Stirling configuration, the overall power production was increased by approximately 10% compared to that of a stand-alone SOFC plant. System efficiencies of approximately 60% are achieved, which is remarkable for such small plant sizes...

  9. 500 keV, 10 kW DC electron accelerator at BRIT, Vashi

    International Nuclear Information System (INIS)

    Sharma, D.K.; Rajan, R.N.; Bakhtsingh, R.I.; Acharya, S.; Rajawat, R.K.

    2017-01-01

    The 500 keV DC accelerator was indigenously designed and developed by Accelerator and Pulse Power Division, BARC during 1994-97 and commissioned at REPF Hall, BRIT, Vashi on 10"t"h August, 1998. The accelerator operation at 3kW beam power for 8 hour shifts was established in February 2001, confirming to industrial standards for EB treatment of plastic sheets as well as various surface-treatment processes for value addition of the products and materials. Since then, this EB facility is functional and being regularly utilized for various applications

  10. Summary revaluation of cold testing of the first block of nuclear power plant Mochovce

    International Nuclear Information System (INIS)

    Miskolci, M.; Sarvaic, I.

    1998-01-01

    The document contents summary revaluation of the stage of cold testing of the first unit of nuclear power plant Mochovce. The valuation is processed in individual systems with safety significance. The process and results of system testing and their conclusions for the block readiness for active testing are summarized in the document. The valuation has been elaborated by a scientific management for start-up of nuclear power plant Mochovce as an independent conductor assistance for activation check from the nuclear safety point of view. The valuation of the activation results of systems in the first unit of nuclear power plant was processed as of 15.3.1998

  11. Cladding using a 15 kW CO2 laser

    International Nuclear Information System (INIS)

    Vesely, E.J.; Verma, S.K.

    1989-01-01

    Laser alloying or cladding differs little in principle from the traditional forms of weld overlays, but lasers as a heat source offer some distinct advantages. With the selective heating attainable using high power lasers, good metallurgical bond of the clad layer, minimal dilution and typically, a very fine homogeneous microstructure can be obtained in the clad layer. This is a review of work in laser cladding using the 15 kW CO 2 laser. The authors discuss the ability of the laser clad surface to increase the high temperature oxidation resistance of a low-alloy carbon steel (4140). Examples of clads subjected to high- temperature thermal cycling of nickel-20% aluminum and TaC + 4140 clad low-alloy steel and straight high-temperature oxidation of Stellite 6-304L cladding on a 4140 substrate are given

  12. Numerical and field tests of hydraulic transients at Piva power plant

    International Nuclear Information System (INIS)

    Giljen, Z

    2014-01-01

    In 2009, a sophisticated field investigation was undertaken and later, in 2011, numerical tests were completed, on all three turbine units at the Piva hydroelectric power plant. These tests were made in order to assist in making decisions about the necessary scope of the reconstruction and modernisation of the Piva hydroelectric power plant, a plant originally constructed in the mid-1970s. More specifically, the investigation included several hydraulic conditions including both the start-up and stopping of each unit, load rejection under governor control from different initial powers, as well as emergency shut-down. Numerical results were obtained using the method of characteristics in a representation that included the full flow system and the characteristics of each associated Francis turbine. The impact of load rejection and emergency shut-down on the penstock pressure and turbine speed changes are reported and numerical and experimental results are compared, showing close agreement

  13. Innovative test method for the estimation of the foaming tendency of substrates for biogas plants

    Energy Technology Data Exchange (ETDEWEB)

    Moeller, Lucie, E-mail: lucie.moeller@ufz.de [UFZ – Helmholtz Centre for Environmental Research, Centre for Environmental Biotechnology, Permoserstrasse 15, 04318 Leipzig (Germany); Eismann, Frank, E-mail: info@antoc.de [Eismann & Stöbe GbR, GeoPark, Geb. A12, Bautzner Strasse 67, 04347 Leipzig (Germany); Wißmann, Daniel, E-mail: d.s.wissmann@gmx.de [University of Hohenheim, State Institute of Agricultural Engineering and Bioenergy (LA740), Garbenstrasse 9, 70599 Stuttgart (Germany); Nägele, Hans-Joachim, E-mail: hajo.naegele@uni-hohenheim.de [University of Hohenheim, State Institute of Agricultural Engineering and Bioenergy (LA740), Garbenstrasse 9, 70599 Stuttgart (Germany); Zielonka, Simon, E-mail: simon.zielonka@uni-hohenheim.de [University of Hohenheim, State Institute of Agricultural Engineering and Bioenergy (LA740), Garbenstrasse 9, 70599 Stuttgart (Germany); Müller, Roland A., E-mail: roland.mueller@ufz.de [UFZ – Helmholtz Centre for Environmental Research, Centre for Environmental Biotechnology, Permoserstrasse 15, 04318 Leipzig (Germany); Zehnsdorf, Andreas, E-mail: andreas.zehnsdorf@ufz.de [UFZ – Helmholtz Centre for Environmental Research, Centre for Environmental Biotechnology, Permoserstrasse 15, 04318 Leipzig (Germany)

    2015-07-15

    Graphical abstract: Display Omitted - Highlights: • Foaming in biogas plants depends on the interactions between substrate and digestate. • Foaming tests enable the evaluation of substrate foaming tendency in biogas plants. • Leipzig foam tester enables foaming tests of substrates prior to use. - Abstract: Excessive foaming in anaerobic digestion occurs at many biogas plants and can cause problems including plugged gas pipes. Unfortunately, the majority of biogas plant operators are unable to identify the causes of foaming in their biogas reactor. The occurrence of foaming is often related to the chemical composition of substrates fed to the reactor. The consistency of the digestate itself is also a crucial part of the foam formation process. Thus, no specific recommendations concerning substrates can be given in order to prevent foam formation in biogas plants. The safest way to avoid foaming is to test the foaming tendency of substrates on-site. A possible solution is offered by an innovative foaming test. With the help of this tool, biogas plant operators can evaluate the foaming disposition of new substrates prior to use in order to adjust the composition of substrate mixes.

  14. The IPRP (Integrated Pyrolysis Regenerated Plant) technology: From concept to demonstration

    International Nuclear Information System (INIS)

    D’Alessandro, Bruno; D’Amico, Michele; Desideri, Umberto; Fantozzi, Francesco

    2013-01-01

    Highlights: â–º IPRP technology development for distributed conversion of biomass and wastes. â–º IPRP demonstrative unit combines a rotary kiln pyrolyzer to a 80 kWe microturbine. â–º Main performances and critical issues are pointed out for different residual fuels. -- Abstract: The concept of integrated pyrolysis regenerated plant (IPRP) is based on a Gas Turbine (GT) fuelled by pyrogas produced in a rotary kiln slow pyrolysis reactor, where waste heat from GT is used to sustain the pyrolysis process. The IPRP plant provides a unique solution for microscale (below 250 kW) power plants, opening a new and competitive possibility for distributed biomass or wastes to energy conversion systems. The paper summarizes the state of art of the IPRP technology, from preliminary numerical simulation to pilot plant facility, including some new available data on pyrolysis gas from laboratory and pilot plants.

  15. On the possibility of using biological toxicity tests to monitor the work of wastewater treatment plants

    Directory of Open Access Journals (Sweden)

    Zorić Jelena

    2008-01-01

    Full Text Available The aim of this study was to ascertain the possibility of using biological toxicity tests to monitor influent and effluent wastewaters of wastewater treatment plants. The information obtained through these tests is used to prevent toxic pollutants from entering wastewater treatment plants and discharge of toxic pollutants into the recipient. Samples of wastewaters from the wastewater treatment plants of Kragujevac and Gornji Milanovac, as well as from the Lepenica and Despotovica Rivers immediately before and after the influx of wastewaters from the plants, were collected between October 2004 and June 2005. Used as the test organism in these tests was the zebrafish Brachydanio rerio Hamilton - Buchanon (Cyprinidae. The acute toxicity test of 96/h duration showed that the tested samples had a slight acutely toxic effect on B. rerio, except for the sample of influent wastewater into the Cvetojevac wastewater treatment plant, which had moderately acute toxicity, indicating that such water should be prevented from entering the system in order to eliminate its detrimental effect on the purification process.

  16. Adaptive Management Plan for Sensitive Plant Species on the Nevada Test Site

    International Nuclear Information System (INIS)

    Wills, C. A.

    2001-01-01

    The Nevada Test Site supports numerous plant species considered sensitive because of their past or present status under the Endangered Species Act and with federal and state agencies. In 1998, the U.S. Department of Energy, Nevada Operation Office (DOE/NV) prepared a Resource Management Plan which commits to protects and conserve these sensitive plant species and to minimize accumulative impacts to them. This document presents the procedures of a long-term adaptive management plan which is meant to ensure that these goals are met. It identifies the parameters that are measured for all sensitive plant populations during long-term monitoring and the adaptive management actions which may be taken if significant threats to these populations are detected. This plan does not, however, identify the current list of sensitive plant species know to occur on the Nevada Test Site. The current species list and progress on their monitoring is reported annually by DOE/NV in the Resource Management Plan

  17. Solar wind power electric plant on Vis (Croatia)

    International Nuclear Information System (INIS)

    1998-01-01

    A project of a solar photovoltaic electric power plant presented by the Republic of Croatia at the meeting of the E.P.I.A. Mission for photovoltaic technology of the Mediterranean countries, aroused a great interest of the representatives of the invited countries. However, the interest within Croatia in the project has disappeared although E.P.I.A. offered a financing of two thirds of costs. There are attempts to construct 1800 kw wind-driven generators at the same location not taking into consideration a possibility of building a hybrid solar-wind-power electric plant. The chance that the solar part is completely of domestic origin is not accepted but the preference is given to the building of imported wind-driven generators. (orig.)

  18. Full scale dynamic testing of Paks nuclear power plant structures

    International Nuclear Information System (INIS)

    Da Rin, E.M.

    1995-01-01

    This report refers to the full-scale dynamic structural testing activities that have been performed in December 1994 at the Paks (H) Nuclear Power Plant, within the framework of: the IAEA Coordinated research Programme 'Benchmark Study for the Seismic Analysis and Testing of WWER-type Nuclear Power Plants, and the nuclear research activities of ENEL-WR/YDN, the Italian National Electricity Board in Rome. The specific objective of the conducted investigation was to obtain valid data on the dynamic behaviour of the plant's major constructions, under normal operating conditions, for enabling an assessment of their actual seismic safety to be made. As described in more detail hereafter, the Paks NPP site has been subjected to low level earthquake like ground shaking, through appropriately devised underground explosions, and the dynamic response of the plant's 1 st reactor unit important structures was appropriately measured and digitally recorded. In-situ free field response was measured concurrently and, moreover, site-specific geophysical and seismological data were simultaneously acquired too. The above-said experimental data is to provide basic information on the geophysical and seismological characteristics of the Paks NPP site, together with useful reference information on the true dynamic characteristics of its main structures and give some indications on the actual dynamic soil-structure interaction effects for the case of low level excitation

  19. Derivation of an expression for the roundoff noise determinant det (KW)^{1/2} for digital filters

    DEFF Research Database (Denmark)

    Jørsboe, Helge

    1978-01-01

    The minimal roundoff noise in fixed point digital filters is determined by a certain determinant, generally denoted by det(KW)^{1/2}. This determinant may be expressed by the poles and zeros of the filter transfer function H(z). This paper presents a simple and direct derivation of this expression...

  20. Assessment of engineering plant analyzer with Peach Bottom 2 stability tests

    International Nuclear Information System (INIS)

    Rohatgi, U.S.; Mallen, A.N.; Cheng, H.S.; Wulff, W.

    1992-01-01

    Engineering Plant Analyzer (EPA) has been developed to simulate plant transients for Boiling Water Reactor (BWR). Recently, this code has been used to simulate LaSalle-2 instability event which was initiated by a failure in the feed water heater. The simulation was performed for the scram conditions and for the postulated failure in the scram. In order to assess the capability of the EPA to simulate oscillatory flows as observed in the LaSalle event, EPA has been benchmarked with the available data from the Peach Bottom 2 (PB2) Instability tests PT1, PT2, and PT4. This document provides a description of these tests

  1. S-band low noise amplifier and 40 kW high power amplifier subsystems of Japanese Deep Space Earth Station

    Science.gov (United States)

    Honma, K.; Handa, K.; Akinaga, W.; Doi, M.; Matsuzaki, O.

    This paper describes the design and the performance of the S-band low noise amplifier and the S-band high power amplifier that have been developed for the Usuda Deep Space Station of the Institute of Space and Astronautical Science (ISAS), Japan. The S-band low noise amplifier consists of a helium gas-cooled parametric amplifier followed by three-stage FET amplifiers and has a noise temperature of 8 K. The high power amplifier is composed of two 28 kW klystrons, capable of transmitting 40 kW continuously when two klystrons are combined. Both subsystems are operating quite satisfactorily in the tracking of Sakigake and Suisei, the Japanese interplanetary probes for Halley's comet exploration, launched by ISAS in 1985.

  2. A 100-kW three-phase ac plasma furnace for spheroidization of aluminum silicate particles

    International Nuclear Information System (INIS)

    Gold, D.; Bonet, C.; Chauvin, G.; Geinaert, G.; Mathieu, A.C.; Millet, J.

    1981-01-01

    A 100-kW three-phase ac plasma furnace with sheathed copper electrodes (sheathing gas: air) is presented. It is used for spheroidizing ''chamotte'' (refractory-fired clay) particles having a smooth, pore-free surface. A simple, one-dimensional numerical model for the heat transfer to the particles explains the maximum processing rate and the detrimental influence of an inhomogeneous particle size distribution

  3. Performance of calcium manganate as oxygen carrier in chemical looping combustion of biochar in a 10 kW pilot

    International Nuclear Information System (INIS)

    Schmitz, Matthias; Linderholm, Carl Johan

    2016-01-01

    Highlights: • A manganese-based perovskite material was used as oxygen carrier in chemical looping combustion. • The oxygen carrier’s performance was superior to materials previously tested in this reactor throughout the testing period. • Under stable conditions, oxygen demand was as low as 2.1% with a carbon capture efficiency of up to 98%. • No signs of agglomeration were detected. • Gaseous oxygen was released at all relevant fuel reactor temperatures. - Abstract: Chemical looping combustion (CLC) and chemical looping with oxygen uncoupling (CLOU) are carbon capture technologies which achieve gas separation by means of cycling oxidation and reduction of a solid oxygen carrier. In this study, the performance and CLOU properties of an oxygen carrier with perovskite structure, CaMn_0_._9Mg_0_._1O_3_−_δ_, were investigated in a 10 kW pilot. The fuel consisted of biochar with very low sulphur content. Around 37 h of operation with fuel were carried out in the 10 kW chemical looping combustor. Previous operational experience in this unit has been achieved using different natural minerals as oxygen carrier – mainly ilmenite and manganese ore. Parametric studies performed in this work included variation of fuel flow, solids circulation rate, temperature and fluidization gas in the fuel reactor. The oxygen carrier was exposed to a total 73 h of hot fluidization (T > 600 °C). No hard particle agglomerations were formed during the experiments. An oxygen demand as low as 2.1% could be reached under stable operating conditions, with a carbon capture efficiency of up to 98%. CLOU properties were observed at all fuel reactor temperatures, ensuring stable operation even without steam as gasification agent present in the fuel reactor. The results suggest that CaMn_0_._9Mg_0_._1O_3_−_δ is suitable for the use as oxygen carrier in chemical looping combustion of solid biochar and offers higher gas conversion than previously tested materials without CLOU

  4. Acute and chronic toxicity testing of bisphenol A with aquatic invertebrates and plants.

    Science.gov (United States)

    Mihaich, Ellen M; Friederich, Urs; Caspers, Norbert; Hall, A Tilghman; Klecka, Gary M; Dimond, Stephen S; Staples, Charles A; Ortego, Lisa S; Hentges, Steven G

    2009-07-01

    Bisphenol A (BPA, 4,4'-isopropylidine diphenol) is a commercially important chemical used primarily as an intermediate in the production of polycarbonate plastic and epoxy resins. Extensive effect data are currently available, including long-term studies with BPA on fish, amphibians, crustaceans, and mollusks. The aim of this study was to perform additional tests with a number of aquatic invertebrates and an aquatic plant. These studies include acute tests with the midge (Chironomus tentans) and the snail (Marisa cornuarietis), and chronic studies with rotifers (Brachionus calyciflorus), amphipods (Hyalella azteca), and plants (Lemna gibba). The effect data on different aquatic invertebrate and plant species presented in this paper correspond well with the effect and no-effect concentrations (NOECs) available from invertebrate studies in the published literature and are within the range found for other aquatic species tested with BPA.

  5. Most experiments done so far with limited plants. Large-scale testing ...

    Indian Academy of Sciences (India)

    First page Back Continue Last page Graphics. Most experiments done so far with limited plants. Large-scale testing needs to be done with objectives such as: Apart from primary transformants, their progenies must be tested. Experiments on segregation, production of homozygous lines, analysis of expression levels in ...

  6. Offshore atomic power plants

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    Various merits of offshore atomic power plants are illustrated, and their systems are assessed. The planning of the offshore atomic power plants in USA is reviewed, and the construction costs of the offshore plant in Japan were estimated. Air pollution problem may be solved by the offshore atomic power plants remarkably. Deep water at low temperature may be advantageously used as cooling water for condensers. Marine resources may be bred by building artificial habitats and by providing spring-up equipments. In the case of floating plants, the plant design can be standardized so that the construction costs may be reduced. The offshore plants can be classified into three systems, namely artificial island system, floating system and sea bottom-based system. The island system may be realized with the present level of civil engineering, but requires the development of technology for the resistance of base against earthquake and its calculation means. The floating system may be constructed with conventional power plant engineering and shipbuilding engineering, but the aseismatic stability of breakwater may be a problem to be solved. Deep water floating system and deep water submerging system are conceivable, but its realization may be difficult. The sea bottom-based system with large caissons can be realized by the present civil engineering, but the construction of the caissons, stability against earthquake and resistance to waves may be problems to be solved. The technical prediction and assessment of new plant sites for nuclear power plants have been reported by Science and Technology Agency in 1974. The construction costs of an offshore plant has been estimated by the Ministry of International Trade and Industry to be yen71,026/kW as of 1985. (Iwakiri, K.)

  7. Uncertainty Evaluation of Residential Central Air-conditioning Test System

    Science.gov (United States)

    Li, Haoxue

    2018-04-01

    According to national standards, property tests of air-conditioning are required. However, test results could be influenced by the precision of apparatus or measure errors. Therefore, uncertainty evaluation of property tests should be conducted. In this paper, the uncertainties are calculated on the property tests of Xinfei13.6 kW residential central air-conditioning. The evaluation result shows that the property tests are credible.

  8. Modeling and Implementation of a 1 kW, Air Cooled HTPEM Fuel Cell in a Hybrid Electrical Vehicle

    DEFF Research Database (Denmark)

    Andreasen, Søren Juhl; Ashworth, Leanne; Remón, Ian Natanael

    2008-01-01

    This work is a preliminary study of using the PBI-based, HTPEM fuel cell technology in automotive applications. This issue was investigated through computational modeling and an experimental investigation. A hybrid fuel cell system, consisting of a 1 kW stack and lead acid batteries, was implemen......This work is a preliminary study of using the PBI-based, HTPEM fuel cell technology in automotive applications. This issue was investigated through computational modeling and an experimental investigation. A hybrid fuel cell system, consisting of a 1 kW stack and lead acid batteries......, was implemented in a small electrical vehicle. A dynamic model was developed using Matlab-Simulink to describe the system characteristics, select operating conditions and to size system components. Preheating of the fuel cell stack with electrical resistors was investigated and found to be an unrealistic approach...

  9. TEST OF AN ANIMAL DRAWN FIELD IMPLEMENT CART

    Directory of Open Access Journals (Sweden)

    Paolo Spugnoli

    2008-06-01

    Full Text Available The field performance of a horse-drawn hitch cart equipped with a PTO system powered by the two cart ground wheels have been investigated. For this purpose field tests on clay and turf soil, with varying ballast and PTO torque, have been carried out pulling the cart by a tractor. Preliminary tests were aimed at assessing the traction capability of horse breed. These tests showed that the mean draught force given by two of these horses was 173daN, average working speed was about 1m*s-1, resulting a mean draught power developed by each horse of about 0.86kW. The PTO cart system performance has shown that the torque has not exceeded 2.4daN*m, maximum draught or PTO power was 1.15kW, rotation speed just higher than 400min-1, with mean efficiency of about 50%. These values are consistent with horse performance and small haymaking, fertilizing, seeding and chemical application machine requirements.

  10. Development of a measurement and control system for a 10 kW@20 K refrigerator based on Siemens PLC S7-300

    Science.gov (United States)

    Li, J.; Liu, L. Q.; Liu, T.; Xu, X. D.; Dong, B.; Lu, W. H.; Pan, W.; Wu, J. H.; Xiong, L. Y.

    2017-02-01

    A 10 kW@20 K refrigerator has been established by the Technical Institute of Physics and Chemistry, Chinese Academy of Sciences. A measurement and control system based on Siemens PLC S7-300 for this 10 kW@20 K refrigerator is developed. According to the detailed measurement requirements, proper sensors and transmitters are adopted. Siemens S7-300 PLC CPU315-2 PN/DP operates as a master station. Two sets of ET200M DP remote expand I/O, one power meter, two compressors and one vacuum gauge operate as slave stations. Profibus-DP field communication and Modbus communication are used between the master station and the slave stations in this control system. The upper computer HMI (Human Machine Interface) is compiled using Siemens configuration software WinCC V7.0. The upper computer communicates with PLC by means of industrial Ethernet. After commissioning, this refrigerator has been operating with a 10 kW of cooling power at 20 K for more than 72 hours.

  11. Preliminary design and economical study of a biogas production-plant using cow manure

    Directory of Open Access Journals (Sweden)

    Juan Miguel Mantilla González

    2007-09-01

    Full Text Available This article presents considerations and results from designing a large- scale biogas production-plant using cow manure. The so designed plant capacity allowed processing the dung from 1,300 cows, producing 500 kW of electrical energy from operating a generator which works on a mixture of diesel and biogas fuel. The design included sizing the cowsheds, the manure-collecting systems, transporting the dung, the digester, the effluent tank and the biogas treatment system. An economic study was also done, concluding that project was viable and the importance of the cost of diesel evolving for determining return on investment time.

  12. Extraterrestrial fiberglass production using solar energy. [lunar plants or space manufacturing facilities

    Science.gov (United States)

    Ho, D.; Sobon, L. E.

    1979-01-01

    A conceptual design is presented for fiberglass production systems in both lunar and space environments. The raw material, of lunar origin, will be plagioclase concentrate, high silica content slag, and calcium oxide. Glass will be melted by solar energy. The multifurnace in the lunar plant and the spinning cylinder in the space plant are unique design features. Furnace design appears to be the most critical element in optimizing system performance. A conservative estimate of the total power generated by solar concentrators is 1880 kW; the mass of both plants is 120 tons. The systems will reproduce about 90 times their total mass in fiberglass in 1 year. A new design concept would be necessary if glass rods were produced in space.

  13. Biomass and bio-fuel based poly-generation for off-grid and grid-connected operation. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    2012-07-01

    The overall objective of this project was to design and build a combined heat and power plant based on an updraft gasifier and a 35 kW electrical output Stirling engine and further to test the flexibility of the plant with regards to fuel and application. In the project a containerized combined heat and power plant including a 200 kW updraft gasifier and a 35 kW electrical output Stirling engine was designed, the specified components were procured, the plant was installed in the three containers and the plant was erected at Amagerforbraendingen ready for the COP15 in November 2009. The potential of operating the Stirling engine in island-mode (without grid connection) was investigated by mathematical modelling. Using an absorption cooling plant connected to the Stirling CHP plant was also investigated. A technical feasibility study was undertaken and it was concluded that from the two available technologies (water/LiBr and Ammonia/water) the appropriate choice is depending on the required cooling temperature. Test runs focussed on investigating the fuel flexibility of two different configurations of Stirling engine CHP plants were carried out - respectively the updraft gasifier plant (the containerized plant and the DTU plant) and the pyrolysis plant (the plant situated at Barritskov). In order to perform these test runs a stable operation is required. On both the containerized plant and the pyrolysis plant this proved to be more challenging than expected and therefore the number of fuels tested was limited to willow chips at the containerized plant and dry wood residues, wood pellets and straw pellets on the pyrolysis plant. For all tested fuels it was possible to operate the plants, however different issues mainly related to the quality of the fuels were encountered. And so it can be concluded that the quality of the fuel is critical for the operation of both the updraft gasifier plant and the pyrolysis plant. A comprehensive desktop evaluation of the feasibility

  14. A diode-pumped continuous-wave Nd:YAG laser with an average output power of 1 kW

    International Nuclear Information System (INIS)

    Lee, Sung Man; Cha, Byung Heon; Kim, Cheol Jung

    2004-01-01

    A diode-pumped Nd:YAG laser with an average output power of 1 kW is developed for industrial applications, such as metal cutting, precision welding, etc. To develop such a diode-pumped high power solid-state laser, a series of laser modules have been used in general with and without thermal birefringence compensation. For example, Akiyama et al. used three laser modules to obtain a output power of 5.4 kW CW.1 In the side-pumped Nd:YAG laser, which is a commonly used pump scheme to obtain high output power, the crystal rod has a short thermal focal length at a high input pump power, and the short thermal focal length in turn leads to beam distortion within a laser resonator. Therefore, to achieve a high output power with good stability, isotropic beam profile, and high optical efficiency, the detailed analysis of the resonator stability condition depending on both mirror distances and a crystal separation is essential

  15. A 3 MW wind power plant at Maglarp in Sweden

    International Nuclear Information System (INIS)

    Koc, B.

    1991-01-01

    The wind power plant at Maglarp, in a frequented region of Sweden, is described. Its technical parameters are given and its environmental impacts are dealt with. The whiz of the rotor blades is heard at a distance of 500 to 1000 m; the author refers to the whiz as pleasant. Not a single bird has been found killed by the facility. Interference with the TV signal can at times be observed in the town; this is more marked with metal rotor blades than with blades made of reinforced plastic. A wing of the wind power plant concentrates on its surface an energy of about 20 kW per square meter. (M.D.)

  16. Guidelines for inservice testing at nuclear power plants

    International Nuclear Information System (INIS)

    Campbell, P.

    1995-04-01

    The staff of the U.S. Nuclear Regulatory Commission (NRC) gives licensees guidelines and recommendations for developing and implementing programs for the inservice testing of pumps and valves at commercial nuclear power plants. The staff discusses the regulations; the components to be included in an inservice testing program; and the preparation and content of cold shutdown justifications, refueling outage justifications, and requests for relief from the American Society of Mechanical Engineers Code requirements. The staff also gives specific guidance on relief acceptable to the NRC and advises licensees in the use of this information at their facilities. The staff discusses the revised standard technical specifications for the inservice testing program requirements and gives guidance on the process a licensee may follow upon finding an instance of noncompliance with the Code

  17. Reactor plant construction productivity, why so different

    International Nuclear Information System (INIS)

    Palmeter, S.B.

    1976-01-01

    The manual labor component (manhours per kw) required to construct a nuclear power plant has increased radically since the advent of the fixed price turnkey projects of the late 1960's and early 1970's. Utilities and their architect-engineers have been, for the past several years, evaluating and diagnosing possible reasons for the increase and, in particular, the wide variation in labor manhours per kw among plants built in the same time frame. Since construction labor can amount to as much as 35--40% of direct capital cost, ways and means must be found to arrest this manhour escalation. One important way is by improving productivity. Some of the manhour increase is beyond an owner's control, e.g. NRC regulatory and other federal and state requirements adding to the scope of work. Several areas where there is potential for productivity improvement are identified as follows: (1) Revise contract strategy and bid work on a fixed price basis. This can be done by utilizing bid packages where the scope of work is clearly identified and based on well defined plans and specifications. (2) Upgrade the quality of construction management and remove first line supervision from union control. Use periodic work sampling to pinpoint causes and cure for poor productivity. (3) Reduce design complexity and improve constructibility by means of innovative design and material utilization--models help. (4) Improve labor productivity by restoring management rights in collective bargaining agreements. If this is not possible, go open shop or owner build with your own work force

  18. Full-scale impact test data for tornado-missile design of nuclear plants

    International Nuclear Information System (INIS)

    Stephenson, A.E.; Sliter, G.E.

    1977-01-01

    It is standard practice to consider the effects of low-probability impacts of tornado-borne debris (''tornado missiles'' such as utility poles and steel pipes) in the structural design of nuclear power plants in the United States. To provide data that can be used directly in the design procedure, a series of full-scale tornado-missile impact tests was performed. This paper is a brief summary of the results and conclusions from these tests. The tests consisted of reinforced concrete panels impacted by poles, pipes, and rods propelled by a rocket sled. The panels were constructed to current minimum standards and had thicknesses typical of auxiliary buildings of nuclear power plants. A specific objective was the determination of the impact velocities below which the panels do not experience backface scabbing. Another objective was to assess the adequacy of (1) conventional design formulae for penetration and scabbing and (2) conventional design methods for overall structural response. Test missiles and velocities represented those in current design standards. Missiles included utility poles, steel pipes, and steel bars. It is important to interpret the data in this paper in recognition that the test conditions represent conservative assumptions regarding maximum wind speeds, injection of the missile into the wind stream, aerodynamic trajectory, and orientation of missile at impact. Even with the severe assumptions made, the full-scale tests described demonstrate the ability of prototypical nuclear plant walls and roofs to provide adequate protection against postulated tornado-missile impact

  19. Mercury exposure on potential plant Ludwigia octovalvis L. - Preliminary toxicological testing

    Science.gov (United States)

    Alrawiq, Huda S. M.; Mushrifah, I.

    2013-11-01

    The preliminary test in phytoremediation is necessaryto determine the ability of plant to survive in media with different concentrations of contaminant. It was conducted to determine the maximum concentration of the contaminant that isharmful to the plant and suppress the plant growth. This study showed the ability of Ludwigia octovalvisto resist mercury (Hg) contaminant in sand containing different concentrations of Hg (0, 0.5, 1, 2, 4, 6 and 8 mg/L). The experimental work wasperformed under greenhouse conditions for an observation period of 4 weeks. Throughout the 4 weeks duration, the resultsshowed that 66.66% of the plants withered for on exposure to Hg concentration of 4 mg/L and 100% withered at higher concentrations of 6 and 8 mg/L. The results of this study may serve as a basis for research that aims to study uptake and accumulation of Hg using potential phytoremediation plants.

  20. Outline of Matsuto coastal park power plant and its operation performance; Matsuto kaihin koen hatsudensho no gaiyo to unten jisseki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-01

    The Matsuto Coastal Park where the power plant was constructed, is well arranged as a central facility in the Matsuto Coastal Community Zone Adjustment Plan, and therefore the offshore breakwater and artificial reef in the coast, the highway oasis established firstly in Japan in the highway, the indoor pool and civic bath utilizing a hot spring in the folktale zone are constructed. A system constitution of the power plant is a hybrid system consisted of one unit of the upwind type propeller wind mill with a capacity of 100 kW and the polycrystal type silicon solar cell with a capacity of 3 kW. The power generated in the power plant is supplied to a lighting up system of wind mill, a Holland type monument wind mill, and the Matsuto cycling terminal completed in a fiscal year of 1994 and so forth. An excess power generated is set to be sold to the power company. An operation state of the mill is in a degree that the wind mill stoppage caused by a mismotion of sensors occurred at several times, and consequently no serious failure has occurred up to present. 1 tab.

  1. Design and test of a 10kW ORC supersonic turbine generator

    Science.gov (United States)

    Seume, J. R.; Peters, M.; Kunte, H.

    2017-03-01

    Manufactures are searching for possibilities to increase the efficiency of combustion engines by using the remaining energy of the exhaust gas. One possibility to recover some of this thermal energy is an organic Rankine cycle (ORC). For such an ORC running with ethanol, the aerothermodynamic design and test of a supersonic axial, single stage impulse turbine generator unit is described. The blade design as well as the regulation by variable partial admission is shown. Additionally the mechanical design of the directly coupled turbine generator unit including the aerodynamic sealing and the test facility is presented. Finally the results of CFD-based computations are compared to the experimental measurements. The comparison shows a remarkably good agreement between the numerical computations and the test data.

  2. Models test on dynamic structure-structure interaction of nuclear power plant buildings

    International Nuclear Information System (INIS)

    Kitada, Y.; Hirotani, T.

    1999-01-01

    A reactor building of an NPP (nuclear power plant) is generally constructed closely adjacent to a turbine building and other buildings such as the auxiliary building, and in increasing numbers of NPPs, multiple plants are being planned and constructed closely on a single site. In these situations, adjacent buildings are considered to influence each other through the soil during earthquakes and to exhibit dynamic behaviour different from that of separate buildings, because those buildings in NPP are generally heavy and massive. The dynamic interaction between buildings during earthquake through the soil is termed here as 'dynamic cross interaction (DCI)'. In order to comprehend DCI appropriately, forced vibration tests and earthquake observation are needed using closely constructed building models. Standing on this background, Nuclear Power Engineering Corporation (NUPEC) had planned the project to investigate the DCI effect in 1993 after the preceding SSI (soil-structure interaction) investigation project, 'model tests on embedment effect of reactor building'. The project consists of field and laboratory tests. The field test is being carried out using three different building construction conditions, e.g. a single reactor building to be used for the comparison purposes as for a reference, two same reactor buildings used to evaluate pure DCI effects, and two different buildings, reactor and turbine building models to evaluate DCI effects under the actual plant conditions. Forced vibration tests and earthquake observations are planned in the field test. The laboratory test is planned to evaluate basic characteristics of the DCI effects using simple soil model made of silicon rubber and structure models made of aluminum. In this test, forced vibration tests and shaking table tests are planned. The project was started in April 1994 and will be completed in March 2002. This paper describes an outline and the summary of the current status of this project. (orig.)

  3. Effects of ultrasonic and thermo-chemical pre-treatments on methane production from fat, oil and grease (FOG) and synthetic kitchen waste (KW) in anaerobic co-digestion.

    Science.gov (United States)

    Li, Chenxi; Champagne, Pascale; Anderson, Bruce C

    2013-02-01

    The effects of ultrasonic and thermo-chemical pre-treatments on the methane production potential of anaerobic co-digestion with synthetic kitchen waste (KW) or fat, oil and grease (FOG) were investigated. Non-linear regressions were fitted to accurately assess and compare the methane production from co-digestion under the various pre-treatment conditions and to achieve representative simulations and predictions. Ultrasonic pre-treatment was not found to improve methane production effectively from either FOG co-digestion or KW co-digestions. Thermo-chemical pre-treatment could increase methane production yields from both FOG and KW co-digestions. COD solubilization was found to effectively represent the effects of pre-treatment. A comprehensive evaluation indicated that the thermo-chemical pre-treatments of pH=10, 55°C and pH=8, 55°C provided the best conditions to increase methane production from FOG and KW co-digestions, respectively. The most effective enhancement of biogas production (288±0.85mLCH(4)/g TVS) was achieved from thermo-chemically pre-treated FOG co-digestion, which was 9.9±1.5% higher than FOG co-digestion without thermo-chemical pre-treatment. Copyright © 2012 Elsevier Ltd. All rights reserved.

  4. Testing methodology of embedded software in digital plant protection system

    International Nuclear Information System (INIS)

    Seong, Ah Young; Choi, Bong Joo; Lee, Na Young; Hwang, Il Soon

    2001-01-01

    It is necessary to assure the reliability of software in order to digitalize RPS(Reactor Protection System). Since RPS causes fatal damage on accidental cases, it is classified as Safety 1E class. Therefore we propose the effective testing methodology to assure the reliability of embedded software in the DPPS(Digital Plant Protection System). To test the embedded software effectively in DPPS, our methodology consists of two steps. The first is the re-engineering step that extracts classes from structural source program, and the second is the level of testing step which is composed of unit testing, Integration Testing and System Testing. On each testing step we test the embedded software with selected test cases after the test item identification step. If we use this testing methodology, we can test the embedded software effectively by reducing the cost and the time

  5. Micro-scale energy valorization of grape marcs in winery production plants.

    Science.gov (United States)

    Fabbri, Andrea; Bonifazi, Giuseppe; Serranti, Silvia

    2015-02-01

    The Biochemical Methane Potential (BMP) of winery organic waste, with reference to two Italian red and white grapes (i.e. Nero Buono and Greco) by-products was investigated. The study was carried out to verify the possibility to reduce the production impact in a green-waste-management-chain-perspective. The possibility to efficiently utilize wine-related-by-products for energy production at a micro-scale (i.e. small-medium scale winery production plant) was also verified. Results showed as a good correlation can be established between the percentage of COD removal and the biogas production, as the winery can produce, from its waste methanization, about 7800 kW h year(-1) electrical and 8900 kW h year(-1) thermal. A critical evaluation was performed about the possibility to utilize the proposed approach to realize an optimal biomass waste management and an energetic valorization in a local-energy-production-perspective. Copyright © 2014 Elsevier Ltd. All rights reserved.

  6. Oregon state university's advanced plant experiment (APEX) AP1000 integral facility test program

    International Nuclear Information System (INIS)

    Reyes, J.N.; Groome, J.T.; Woods, B.G.; Young, E.; Abel, K.; Wu, Q.

    2005-01-01

    Oregon State University (OSU) has recently completed a three year study of the thermal hydraulic behavior of the Westinghouse AP1000 passive safety systems. Eleven Design Basis Accident (DBA) scenarios, sponsored by the U.S. Department of Energy (DOE) with technical support from Westinghouse Electric, were simulated in OSU's Advanced Plant Experiment (APEX)-1000. The OSU test program was conducted within the purview of the requirements of 10CFR50 Appendix B, NQA-1 and 10 CFR 21 and the test data was used to provide benchmarks for computer codes used in the final design approval of the AP1000. In addition to the DOE certification testing, OSU conducted eleven confirmatory tests for the U.S. Nuclear Regulatory Commission. This paper presents the test program objectives, a description of the APEX-1000 test facility and an overview of the test matrix that was conducted in support of plant certification. (authors)

  7. Performance analysis of PV plants: Optimization for improving profitability

    International Nuclear Information System (INIS)

    Díez-Mediavilla, M.; Alonso-Tristán, C.; Rodríguez-Amigo, M.C.; García-Calderón, T.; Dieste-Velasco, M.I.

    2012-01-01

    Highlights: â–º Real PV production from two 100 kW p grid-connected installations is conducted. â–º Data sets on production were collected over an entire year. â–º Economic results highlight the importance of properly selecting the system components. â–º Performance of PV plants is directly related to improvements of all components. - Abstract: A study is conducted of real PV production from two 100 kW p grid-connected installations located in the same area, both of which experience the same fluctuations in temperature and radiation. Data sets on production were collected over an entire year and both installations were compared under various levels of radiation. The installations were assembled with mono-Si panels, mounted on the same support system, and the power supply was equal for the inverter and the measurement system; the same parameters were also employed for the wiring, and electrical losses were calculated in both cases. The results, in economic terms, highlight the importance of properly selecting the system components and the design parameters for maximum profitability.

  8. Trace coupled with PARCS benchmark against Leibstadt plant data during the turbine trip test

    Energy Technology Data Exchange (ETDEWEB)

    Sekhri, Abdelkrim; Baumann, Peter, E-mail: abdelkrim.sekhri@kkl.ch, E-mail: peter.Baumann@kkl.ch [KernkraftwerkLeibstadt AG, Leibstadt (Switzerland); Hidalga, Patricio; Morera, Daniel; Miro, Rafael; Barrachina, Teresa; Verdu, Gumersindo, E-mail: pathigar@etsii.upv.es, E-mail: dmorera@isirym.upv.es, E-mail: rmiro@isirym.upv.es, E-mail: tbarrachina@isirym.upv.es, E-mail: gverdu@isirym.upv.es [Universitat Politecnica de Valencia (ISIRYM/UPV), Valencia, (Spain). Institute for Industrial, Radiophysical and Environmental Safety

    2013-07-01

    In order to enhance the modeling of Nuclear Power Plant Leibstadt (KKL), the coupling of 3D neutron kinetics PARCS code with TRACE has been developed. To test its performance a complex transient of Turbine Trip has been simulated comparing the results with the existing plant data of Turbine Trip test. For this transient also Cross Sections have been generated and used by PARCS. The thermal-hydraulic TRACE model is retrieved from the already existing model. For the benchmarking the Turbine Trip transient has been simulated according to the test resulting in the closure of the turbine control valve (TCV) and the following opening of the bypass valve (TBV). This transient caused a pressure shock wave towards the Reactor Pressure Vessel (RPV) which provoked the decreasing of the void level and the consequent slight power excursion. The power control capacity of the system showed a good response with the procedure of a Selected Rod Insertion (SRI) and the recirculation loops performance which resulted in the proper thermal power reduction comparable to APRM data recorder from the plant. The comparison with plant data shows good agreement in general and assesses the performance of the coupled model. Due to this, it can be concluded that the coupling of PARCS and TRACE codes in addition with the Cross Section used works successfully for simulating the behavior of the reactor core during complex plant transients. Nevertheless the TRACE model shall be improved and the core neutronics corresponding to the test shall be used in the future to allow quantitative comparison between TRACE and plant recorded data. (author)

  9. Results of Cable Aging Management Tests for Laguna Verde Nuclear Power Plant

    International Nuclear Information System (INIS)

    Garcia Hernandez, E.E.; Vazquez Cervantes, R.M.; Bonifacio M, J.; Garcia Garcia, J.

    2012-01-01

    Laguna Verde Nuclear Power Plant (LVNPP) located in Veracruz, Mexico is a BWR plant, two Units with 810 MWe each one, Unit 1 (1989) and Unit 2 (1990). The Equipment Qualification (EQ) Group at the Nuclear Research National Institute (ININ) has been working with the plant on tasks to develop the LVNPP cables Aging Management Program (AMP), as part of the technical basis to extend the operational life of the plant through license renewal up to 60 years. LVNPP cables are qualified for 40 years plus a LOCA DBA in accordance with 10.CFR 50.49 and the IEEE Std-323 and IEEE St. 383. The first studies for cables AMP have been performed with samples of safety related I and C cables taken from the LVNPP warehouse, similar brands and models as installed at the plant. ININ applied the condition monitoring techniques to these samples to identify predictive degradation and to establish the methodology for cables AMP, focused to the LVNPP license renewal. Cable tests program has been running at the EQ Lab in ININ, performing accelerated aging by steps up to 60 years and to 40 years plus a LOCA test. Determination for Activation Energy (Ea) and Oxidation Induction Time (OIT) methods were developed applying a DSC/TGA calorimeter. (author)

  10. A new cryogenic test facility for large superconducting devices at CERN

    CERN Document Server

    Perin, A; Serio, L; Stewart, L; Benda, V; Bremer, J; Pirotte, O

    2015-01-01

    To expand CERN testing capability to superconducting devices that cannot be installed in existing test facilities because of their size and/or mass, CERN is building a new cryogenic test facility for large and heavy devices. The first devices to be tested in the facility will be the S-FRS superconducting magnets for the FAIR project that is currently under construction at the GSI Research Center in Darmstadt, Germany. The facility will include a renovated cold box with 1.2 kW at 4.5 K equivalent power with its compression system, two independent 15 kW liquid nitrogen precooling and warm-up units, as well as a dedicated cryogenic distribution system providing cooling power to three independent test benches. The article presents the main input parameters and constraints used to define the cryogenic system and its infrastructure. The chosen layout and configuration of the facility is presented and the characteristics of the main components are described.

  11. Modernisation of hydrogenerators. Upgrading of power plants for more efficiency; Modernisierung von Hydrogeneratoren. Kraftwerks-Upgrade fuer mehr Effizienz

    Energy Technology Data Exchange (ETDEWEB)

    Allen, John

    2012-07-01

    Ever since the construction of the first alternating current hydroelectric power plant with a performance of 12.5 kW in the year 1882, the number and performance of hydroelectric power plants had increased substantially. For example, the hydroelectric power plant at the Three Gorges Dam in the People's Republic of China has a total performance of 22,500 MW. The isolation systems of the hydrogenerators have a limited lifetime and have to be exchanged after fifty years usually. Under this aspect, the authors of the contribution under consideration reports on the upgrading of hydrogenerators for more efficiency.

  12. Diesel generator trailer acceptance test procedure

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1994-01-01

    This Acceptance Test Procedure (ATP) will document compliance with the requirements of WHC-S-0252 Rev. 1 and ECNs 609271, and 609272. The equipment being tested is a 150KW Diesel Generator mounted on a trailer with switchgear. The unit was purchased as a Design and Fabrication procurement activity. The ATP was written by the Seller and will be performed by the Seller with representatives of the Westinghouse Hanford Company witnessing the test at the Seller's location

  13. Helium turbomachinery operating experience from gas turbine power plants and test facilities

    International Nuclear Information System (INIS)

    McDonald, Colin F.

    2012-01-01

    The closed-cycle gas turbine, pioneered and deployed in Europe, is not well known in the USA. Since nuclear power plant studies currently being conducted in several countries involve the coupling of a high temperature gas-cooled nuclear reactor with a helium closed-cycle gas turbine power conversion system, the experience gained from operated helium turbomachinery is the focus of this paper. A study done as early as 1945 foresaw the use of a helium closed-cycle gas turbine coupled with a high temperature gas-cooled nuclear reactor, and some two decades later this was investigated but not implemented because of lack of technology readiness. However, the first practical use of helium as a gas turbine working fluid was recognized for cryogenic processes, and the first two small fossil-fired helium gas turbines to operate were in the USA for air liquefaction and nitrogen production facilities. In the 1970's a larger helium gas turbine plant and helium test facilities were built and operated in Germany to establish technology bases for a projected future high efficiency large nuclear gas turbine power plant concept. This review paper covers the experience gained, and the lessons learned from the operation of helium gas turbine plants and related test facilities, and puts these into perspective since over three decades have passed since they were deployed. An understanding of the many unexpected events encountered, and how the problems, some of them serious, were resolved is important to avoid them being replicated in future helium turbomachines. The valuable lessons learned in the past, in many cases the hard way, particularly from the operation in Germany of the Oberhausen II 50 MWe helium gas turbine plant, and the technical know-how gained from the formidable HHV helium turbine test facility, are viewed as being germane in the context of current helium turbomachine design work being done for future high efficiency nuclear gas turbine plant concepts. - Highlights: â

  14. Fuel staging tests at the Kymijaervi power plant

    International Nuclear Information System (INIS)

    Kivelae, M.; Rotter, H.; Virkki, J.

    1990-01-01

    The aim of this study was to measure nitrogen oxide (NO x ) emissions and find the methods to reduce them in plants using coal and natural gas as fuel. The tests involved were made at the Kymijaervi Power Plant, Lahti, Finland. Coal and natural gas was used alone or mixed. With natural gas when using flue gas recirculation, the NO x emission level dropped from 330 mg/m 3 down to 60 mg/m 3 . A negative side effect was that the flue gas temperature increased. At coal combustion and staged combustion, the flue gas recirculation had no significant effect on the NO x emission level. At coal combustion, the staging of combustion air halved the NO x emission but the combustibles increased strongly. With fuel staging, using coal as main fuel and gas as staging fuel, the NO x emission level was decreased from 340 mg/m 3 to 170 mg/m 3 . At the same time the combustibles increased 2 %- units. Also the flue gas temperature increased a little. At the tests, the proportion of natural gas was rather high, one third of the fuel energy input, but it could not be decreased, because the gas flow ratio was already too low to ensure good mixing

  15. A Double-blind Trial of Lactobacillus paracasei Strain KW3110 Administration for Immunomodulation in Patients with Pollen Allergy

    Directory of Open Access Journals (Sweden)

    Daisuke Fujiwara

    2005-01-01

    Conclusions: Our results suggest that ingestion of the L. paracasei strain KW3110 is associated with both repression of Th2 cell generation and eosinophil activation. Our data point to the possibility that specific lactic acid bacteria may be useful for allergy therapy.

  16. An update technology for integrated biomass gasification combined cycle power plant

    International Nuclear Information System (INIS)

    Bhattacharya, P.; Dey, S.

    2014-01-01

    A discussion is presented on the technical analysis of a 6.4 M W_e integrated biomass gasification combined cycle (IBGCC) plant. It features three numbers of downdraft biomass gasifier systems with suitable gas clean-up trains, three numbers of internal combustion (IC) producer gas engines for producing 5.85 MW electrical power in open cycle and 550 kW power in a bottoming cycle using waste heat. Comparing with IC gas engine single cycle systems, this technology route increases overall system efficiency of the power plant, which in turn improves plant economics. Estimated generation cost of electricity indicates that mega-watt scale IBGCC power plants can contribute to good economies of scale in India. This paper also highlight's the possibility of activated carbon generation from the char, a byproduct of gasification process, and use of engine's jacket water heat to generate chilled water through VAM for gas conditioning. (author)

  17. Culinary Spice Plants in Dietary Supplement Products and Tested in Clinical Trials123

    Science.gov (United States)

    Saldanha, Leila G; Dwyer, Johanna T; Betz, Joseph M

    2016-01-01

    Dried plant parts used as culinary spices (CSs) in food are permitted as dietary ingredients in dietary supplements (DSs) within certain constraints in the United States. We reviewed the amounts, forms, and nutritional support (structure/function) claims of DSs that contain CS plants listed in the Dietary Supplement Label Database (DSLD) and compared this label information with trial doses and health endpoints for CS plants that were the subject of clinical trials listed in clinicaltrials.gov. According to the DSLD, the CS plants occurring most frequently in DSs were cayenne, cinnamon, garlic, ginger, pepper, rosemary, and turmeric. Identifying the botanical species, categorizing the forms used, and determining the amounts from the information provided on DS labels was challenging. CS plants were typically added as a component of a blend, as the powered biomass, dried extracts, and isolated phytochemicals. The amounts added were declared on about 55% of the labels, rendering it difficult to determine the amount of the CS plant used in many DSs. Clinicaltrials.gov provided little information about the composition of test articles in the intervention studies. When plant names were listed on DS labels and in clinical trials, generally the common name and not the Latin binomial name was given. In order to arrive at exposure estimates and enable researchers to reproduce clinical trials, the Latin binomial name, form, and amount of the CS plant used in DSs and tested in clinical trials must be specified. PMID:26980817

  18. Rf system description for the ground test accelerator radio-frequency quadrupole

    International Nuclear Information System (INIS)

    Regan, A.H.; Brittain, D.; Rees, D.E.; Ziomek, D.

    1992-01-01

    This paper describes the RF system being used to provide RF power and to control the cavity field used for the ground test accelerator (GTA) radio-frequency quadrupole (RFQ). The RF system consists of a low-level RF (LLRF) control system that uses a tetrode as a high-power amplifier (HPA) as part of its plant to deliver up to 300 kW of peak power to the RFQ at a 2% duty factor. The LLRF control system implements in-phase and quadrature (I ampersand Q) control to maintain the cavity field within tolerances of 0.5% in amplitude and 0.5 degrees in phase in the presence of beam-induced instabilities. This paper describes the identified components and presents measured performance data. The user interface with the systems is described, and cavity field measurements are included

  19. Round Robin Test for Performance Demonstration System of Ultrasound Examination Personnel in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kim, Young Ho; Yang, Seung Han; Kim, Yong Sik; Yoon, Byung Sik; Lee, Hee Jong

    2005-01-01

    Ultrasound testing performance during in-service inspection for the main components of NPPs is strongly affected by each examination person. Therefore, ASME established a more strict qualification requirement in Sec. XI Appendix VIII for the ultrasound testing personnel in nuclear power plants. The Korean Performance Demonstration (KPD) System according to the ASME code for the ultrasonic testing personnel, equipments, and procedures to apply to the Class 1 and 2 piping ultrasound examination of nuclear power plants in Korea was established. And a round robin test was conducted in order to verify the effectiveness of PD method by comparing the examination results from the method of Performance Demonstration (PD) and a traditional ASME code dB-drop method. The round robin test shows that the reliability of the PD method is better than that of the dB-drop method. As a result, application of the PD method to the in-service inspection of the nuclear power plants will improve the performance of ultrasound testing

  20. ENERGY EFFICIENCY OF DIESEL LOCOMOTIVE HYDRAULIC TRANSMISSION TESTS AT LOCOMOTIVE REPAIR PLANT

    Directory of Open Access Journals (Sweden)

    B. E. Bodnar

    2015-10-01

    Full Text Available Purpose. In difficult economic conditions, cost reduction of electricity consumption for the needs of production is an urgent task for the country’s industrial enterprises. Technical specifications of enterprises, which repair diesel locomotive hydraulic transmission, recommend conducting a certain amount of evaluation and regulatory tests to monitor their condition after repair. Experience shows that a significant portion of hydraulic transmission defects is revealed by bench tests. The advantages of bench tests include the ability to detect defects after repair, ease of maintenance of the hydraulic transmission and relatively low labour intensity for eliminating defects. The quality of these tests results in the transmission resource and its efficiency. Improvement of the technology of plant post-repairs hydraulic tests in order to reduce electricity consumption while testing. Methodology. The possible options for hydraulic transmission test bench improvement were analysed. There was proposed an energy efficiency method for diesel locomotive hydraulic transmission testing in locomotive repair plant environment. This is achieved by installing additional drive motor which receives power from the load generator. Findings. Based on the conducted analysis the necessity of improving the plant stand testing of hydraulic transmission was proved. The variants of the stand modernization were examined. The test stand modernization analysis was conducted. Originality. The possibility of using electric power load generator to power the stand electric drive motor or the additional drive motor was theoretically substantiated. Practical value. A variant of hydraulic transmission test stand based on the mutual load method was proposed. Using this method increases the hydraulic transmission load range and power consumption by stand remains unchanged. The additional drive motor will increase the speed of the input shaft that in its turn wil allow testing in

  1. A nuclear power plant certification test plan and checklist

    International Nuclear Information System (INIS)

    Halverson, S.M.

    1989-01-01

    Regulations within the nuclear industry are requiring that all reference plant simulators be certified prior to or during 1991. A certification test plan is essential to ensure that this goal is met. A description of each step in the certification process is provided in this paper, along with a checklist to help ensure completion of each item

  2. Full-scale dynamic structural testing of Paks nuclear power plant

    International Nuclear Information System (INIS)

    Da Rin, E.M.; Muzzi, F.P.

    1995-01-01

    Within the framework of the IAEA coordinated 'Benchmark Study for the seismic analysis and testing of WWER-type NPPs', in-situ dynamic structural testing activities have been performed at the Paks Nuclear Power Plant in Hungary. The specific objective of the investigation was to obtain experimental data on the actual dynamic structural behaviour of the plant's major constructions and equipment under normal operating conditions, for enabling a valid seismic safety review to be made. This paper gives a synthetic description of the conducted experiments and presents some results, regarding in particular the free-field excitations produced during the earthquake-simulation experiments and an experiment of the dynamic soil-structure interaction global effects at the base of the reactor containment structure. Moreover, a method which can be used for inferring dynamic structural characteristics from the recorded time-histories is briefly described and a simple illustrative example given. (author)

  3. Decontamination and decommissioning of the EBR-I complex. Topical report No. 3. NAK disposal pilot plant test

    International Nuclear Information System (INIS)

    Commander, J.C.; Lewis, L.; Hammer, R.

    1975-06-01

    Decontamination and decommissioning of the Experimental Breeder Reactor No. 1 (EBR-I) requires processing of the primary coolant, an eutectic solution of sodium and potassium (NaK), remaining in the EBR-I primary and secondary coolant systems. While developing design criteria for the NaK processing system, reasonable justification was provided for the development of a pilot test plant for field testing some of the process concepts and proposed hardware. The objective of this activity was to prove the process concept on a low-cost, small-scale test bed. The pilot test plant criteria provided a general description of the test including: the purpose, location, description of test equipment available, waste disposal requirements, and a flow diagram and conceptual equipment layout. The pilot plant test operations procedure provided a detailed step-by-step procedure for operation of the pilot plant to obtain the desired test data and operational experience. It also spelled out the safety precautions to be used by operating personnel, including the requirement for alkali metals training certification, use of protective clothing, availability of fire protection equipment, and caustic handling procedures. The pilot plant test was performed on May 16, 1974. During the test, 32.5 gallons or 240 lb of NaK was successfully converted to caustic by reaction with water in a caustic solution. (auth)

  4. Creep property testing of energy power plant component material

    International Nuclear Information System (INIS)

    Nitiswati, Sri; Histori; Triyadi, Ari; Haryanto, Mudi

    1999-01-01

    Creep testing of SA213 T12 boiler piping material from fossil plant, Suralaya has been done. The aim of the testing is to know the creep behaviour of SA213 T12 boiler piping material which has been used more than 10 yeas, what is the material still followed ideal creep curve (there are primary stage, secondary stage, and tertiary stage). This possibility could happened because the material which has been used more than 10 years usually will be through ageing process because corrosion. The testing was conducted in 520 0C, with variety load between 4% until 50% maximum allowable load based on strength of the material in 520 0C

  5. Verification Test of Hydraulic Performance for Reactor Coolant Pump

    Energy Technology Data Exchange (ETDEWEB)

    Park, Sang Jun; Kim, Jae Shin; Ryu, In Wan; Ko, Bok Seong; Song, Keun Myung [Samjin Ind. Co., Seoul (Korea, Republic of)

    2010-01-15

    According to this project, basic design for prototype pump and model pump of reactor coolant pump and test facilities has been completed. Basic design for prototype pump to establish structure, dimension and hydraulic performance has been completed and through primary flow analysis by computational fluid dynamics(CFD), flow characteristics and hydraulic performance have been established. This pump was designed with mixed flow pump having the following design requirements; specific velocity(Ns); 1080.9(rpm{center_dot}m{sup 3}/m{center_dot}m), capacity; 3115m{sup 3}/h, total head ; 26.3m, pump speed; 1710rpm, pump efficiency; 77.0%, Impeller out-diameter; 349mm, motor output; 360kw, design pressure; 17MPaG. The features of the pump are leakage free due to no mechanical seal on the pump shaft which insures reactor's safety and law noise level and low vibration due to no cooling fan on the motor which makes eco-friendly product. Model pump size was reduced to 44% of prototype pump for the verification test for hydraulic performance of reactor coolant pump and was designed with mixed flow pump and canned motor having the following design requirements; specific speed(NS); 1060.9(rpm{center_dot}m{sup 3}/m{center_dot}m), capacity; 539.4m{sup 3}/h, total head; 21.0m, pump speed; 3476rpm, pump efficiency; 72.9%, Impeller out-diameter; 154mm, motor output; 55kw, design pressure; 1.0MPaG. The test facilities were designed for verification test of hydraulic performance suitable for pump performance test, homologous test, NPSH test(cavitation), cost down test and pressure pulsation test of inlet and outlet ports. Test tank was designed with testing capacity enabling up to 2000m{sup 3}/h and design pressure 1.0MPaG. Auxiliary pump was designed with centrifugal pump having capacity; 1100m{sup 3}/h, total head; 42.0m, motor output; 190kw

  6. About the gasification of untreated scrap and waste wood in fluidized bed reactor for use in decentralized gas engine-cogeneration plants; Zur Vergasung von Rest- und Abfallholz in Wirbelschichtreaktoren fuer dezentrale Energieversorgungsanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Tepper, H.

    2005-10-20

    This dissertation examines the thermochemical conversion (gasification) of untreated scrap and waste wood in combustible gases for use in decentralized gas engine-cogeneration plants of low output (1 to 10 MW fuel power). A general section goes into the basics of the energetic utilization of solid biomass, the subprocesses of thermochemical conversion being described in more detail. Special attention is given to the processes and state of the art of biomass gasification in decentralized plants. A theoretical section analyzes the gasification models for solid biomass presented in the literature. Based on this analysis, a simplified kinetic model is derived for the gasification of untreated scrap and waste wood with air in bubbling fluidized bed reactors. It includes a fluid mechanic analysis of the fluidized bed based on HILLIGARDT, an empirical pyrolysis model and a global kinetic approach to the main chemical reaction taken from the literature. An experimental section describes the tests of the gasification of forest scrap wood in a semi-industrial fluidized bed gasification test plant with 150 kW fuel power and presents the significant test results. The gasification model derived is applied to check the test plant's standard settings and compare them with measured values. Furthermore, the model is employed to explain basic reaction paths and zones and to perform concluding parameter simulations. (orig.)

  7. A 30 KW RF power amplifier for the RFQ accelerator (Paper No. CP 27)

    International Nuclear Information System (INIS)

    Luktuke, R.D.; Garud, A.N.; Murthy, P.N.K.; Sethi, R.C.

    1990-01-01

    A radio frequency quadrupole (RFQ) accelerator, to accelerate deuterons to an energy of 150 keV with beam current of 20 mA, has been designed and is under construction. This accelerator needs approximately 30 kW of RF power to generate the desired voltage of 55 kV on the electrodes, at a frequency of 45 MHz. The power amplifier is designed with four stages of RF amplification using vacuum tubes. The first two stages are built with the tubes 6146 and BEL 250 CX, to deliver about 100 watts power to the grid circuit of the pre driver. The pre driver (EIMAC 5 CX 1500 A) and the driver (BEL 4000 CX) give an output power of about 5kW, at the grid of the high power amplifier. All the four tubes operate in class A/AB mode. The high power amplifier has been designed and is being built around the BEL power tetrode tube CQK-50-2. The output from the high power amplifier is fed to the RFQ, via a matching network to tranform the plate impedance to 50 ohm loop impedeance at the RFQ. The paper presents the design aspects of the high power amplifier, matching network and the results obtained for the earlier stages. (author). 3 refs., 3 tabs., 2 figs

  8. Insurance risk of nuclear power plant concentrations

    International Nuclear Information System (INIS)

    Feldmann, J.

    1976-01-01

    The limited number of sites available in the Federal Republic of Germany for the erection of nuclear power plants has resulted in the construction of multiple nuclear generating units on a few sites, such as Biblis, Gundremmingen and Neckarwestheim. At a value invested of approximately DM 1,200/kW this corresponds to a property concentration on one site worth DM 2 - 3 billion and more. This raises the question whether a concentration of value of this magnitude does not already exceed the limits of bearable economic risks. The property risk of a nuclear power plant, as that of any other industrial plant, is a function of the property that can be destroyed in a maximum probable loss. Insurance companies subdivide plants into so-called complex areas in which fire damage or nuclear damage could spread. While in some foreign countries twin nuclear power plants are built, where the technical systems of both units are installed in one building without any physical separation, dual unit plants are built in the Federal Republic in which the complexes with a high concentration of valuable property are physically separate building units. As a result of this separation, property insurance companies have no grounds for assessing the risk and hence, the premium different from those of single unit plants. (orig.) [de

  9. Results of extended plant tests using more realistic exposure scenarios for improving environmental risk assessment of veterinary pharmaceuticals.

    Science.gov (United States)

    Richter, Elisabeth; Berkner, Silvia; Ebert, Ina; Förster, Bernhard; Graf, Nadin; Herrchen, Monika; Kühnen, Ute; Römbke, Jörg; Simon, Markus

    2016-01-01

    Residues of veterinary medicinal products (VMPs) enter the environment via application of manure onto agricultural areas where in particular antibiotics can cause phytotoxicity. Terrestrial plant tests according to OECD guideline 208 are part of the environmental risk assessment of VMPs. However, this standard approach might not be appropriate for VMPs which form non-extractable residues or transformation products in manure and manure-amended soil. Therefore, a new test design with a more realistic exposure scenario via manure application is needed. This paper presents an extended plant test and its experimental verification with the veterinary antibiotics florfenicol and tylosin tartrate. With each substance, plant tests with four different types of application were conducted: standard tests according to OECD 208 and three tests with application of test substance via spiked manure either without storage, aerobically incubated, or anaerobically incubated for different time periods. In standard tests, the lowest NOEC was tylosin tartrate. Pre-tests showed that plant growth was not impaired at 22-g fresh manure/kg dry soil, which therefore was used for the final tests. The application of the test substances via freshly spiked as well as via aerobically incubated manure had no significant influence on the test results. Application of florfenicol via anaerobically incubated manure increased the EC10 by a factor up to 282 and 540 for half-maximum and for maximum incubation period, respectively. For tylosin tartrate, this factor amounted to 64 at half-maximum and 61 at maximum incubation period. The reduction of phytotoxicity was generally stronger when using cattle manure than pig manure and particularly in tests with cattle manure phytotoxicity decreased over the incubation period. The verification of the extended plant test showed that seedling emergence and growth are comparable to a standard OECD 208 test and reliable effect concentrations could be established. As

  10. Preliminary results on performance testing of a turbocharged rotary combustion engine

    Science.gov (United States)

    Meng, P. R.; Rice, W. J.; Schock, H. J.; Pringle, D. P.

    1982-01-01

    The performance of a turbocharged rotary engine at power levels above 75 kW (100 hp) was studied. A twin rotor turbocharged Mazda engine was tested at speeds of 3000 to 6000 rpm and boost pressures to 7 psi. The NASA developed combustion diagnostic instrumentation was used to quantify indicated and pumping mean effect pressures, peak pressure, and face to face variability on a cycle by cycle basis. Results of this testing showed that a 5900 rpm a 36 percent increase in power was obtained by operating the engine in the turbocharged configuration. When operating with lean carburetor jets at 105 hp (78.3 kW) and 4000 rpm, a brake specific fuel consumption of 0.45 lbm/lb-hr was measured.

  11. Design, Construction and Operation of a Molten Carbonate Fuel Cell (MCFC) in the 100-kW-Class

    International Nuclear Information System (INIS)

    Heiming, Andreas; Huppmann, Gerhard; Aasberg-Petersen, Kim

    1999-01-01

    In fuel cells, the electrochemical energy of the fuel is converted directly into electricity and heat. The electrochemical conversion is inherently related to high electrical efficiencies and very low pollutant emissions. Fuel cells with sufficiently high operating temperatures such as (1) the phosphoric acid fuel cell (PAFC), operating temperature: 200 o C, (2) the molten carbonate fuel cell (MCFC), operating temperature: 650 o C and (3) the solid oxide fuel cell (SOFC), operating temperature: around 900 o C are best suited for decentralised combined heat and power (CHP) applications. This is due to the fact, that the heat of the exothermic reaction taking place in the fuel cell can be used in the domestic, commercial and industrial sector for heating and hot water or steam production. At the present time, gas-engines or gas-turbines are the preferred CHP-technologies for these applications. Nowadays, the PAFC is commercially available. More than 160 plants, each with a power of 200 kW, have been installed world-wide. Ruhrgas has investigated the behaviour of a 200 kW PAFC at its research centre in Dorsten, Germany, and at the site of a local utility. High temperature fuel cells such as MCFC or SOFC promise electrical efficiencies above 50 % in simple cycle mode. Up to now, MCFC-test plants have been built and operated in the 100 kW to 1 MW power range. The largest MCFC ever operated consisted of 16 identical stacks of 125 kW each, resulting in a plant power of 2 MW. The initial experience with SOFC in this power-range is currently gained from the operation of a 100 kW plant. In this paper, the result of the construction and operation of a highly innovatively designed 280 kW MCFC will be presented. This plant has been designed, built and operated by a European consortium for the development and market introduction of the MCFC. Members of the consortium are MTU-Friedrichshafen GmbH, Haldor Topsoee NS, Elkraft A.m.b.H., RWE Energie AG and Ruhrgas AG. (author)

  12. Development and test of 2 kW natural gas reformers for high and low temperature PEM fuel cells. Project report 2; Udvikling/afproevning af 2 kW naturgasreformere for hoej- og lavtemperatur PEM-braendselsceller. Projektrapport 2

    Energy Technology Data Exchange (ETDEWEB)

    Wit, J. de [Dansk Gasteknisk Center (Denmark); Bech-Madsen, J. [IRD (Denmark); Bandur, V. [DTU (Denmark); Bartholin, N. [DPS (Denmark)

    2005-11-15

    The use of fuel cells for combined heat and power generation has advantages as regards technology and usability compared to existing CHP technology. Special characteristics for a fuel cell plant are: 1) It can be constructed in modules over a wide power range, 2) The efficiency is significantly independent of size, 3) It is noiseless, 4) A flexible coupling between power and heat production, 5) As there is no movable parts, long service check intervals can be expected, 6) Low emissions. The fuel for fuel cells is hydrogen and optimal utilization and CO{sub 2} reduction will require a 'hydrogen society'. While waiting for a 'hydrogen society' to arise, it is possible to use central or on-site reformers that convert natural gas to hydrogen. There will be some CO{sub 2} emission connected to energy use. The objective of the present project has been development and test of on-site reformers (fuel processors) for hydrogen supply to respectively high and low temperature PEM fuel cells aiming at use in single family houses. Sulphur cleaning, reformers, and lab-scale coupling with fuel cell KV units have been developed and tested during the project, as well as development and test of periphery equipment. (BA)

  13. 3.05 kW monolithic fiber laser oscillator with simultaneous optimizations of stimulated Raman scattering and transverse mode instability

    Science.gov (United States)

    Yang, Baolai; Zhang, Hanwei; Shi, Chen; Tao, Rumao; Su, Rongtao; Ma, Pengfei; Wang, Xiaolin; Zhou, Pu; Xu, Xiaojun; Lu, Qisheng

    2018-01-01

    We report a high power monolithic ytterbium-doped fiber laser oscillator with an output power of 3.05 kW, which is achieved by simultaneous optimizations of the stimulated Raman scattering (SRS) and transverse mode instability (TMI). The optimizations of the SRS are designed and utilized in the construction of the fiber laser oscillator, while the TMI threshold is optimized with the study of the dependence of TMI threshold on the pump distribution. In the fiber laser oscillator, the TMI threshold is enhanced by ˜30% when the counter-pump scheme is employed instead of the co-pump scheme. By applying bidirectional-pump scheme and appropriately distributing the pump power, the TMI threshold is further enhanced and the monolithic fiber laser oscillator achieves an output power of 3.05 kW with near diffraction limited beam quality.

  14. A small floating seawater desalination plant by using a nuclear heating reactor coupled with the MED process

    Energy Technology Data Exchange (ETDEWEB)

    Xue Dazhi; Zhang Dafang; Dong Duo [Institute of Nuclear Energy Technology, Tsinghua University, Beijing (China)

    2000-03-01

    Based on the experience of development of nuclear district heating reactor (NHR) a seawater desalination plant using NHR coupled with the multi-effect distillation (MED) process is being designed. With the same technology a floating desalination plant was proposed to supply potable water to remote areas or islands. With a 10 MWth NHR the floating plant could produce 4000 m{sup 3}/d of potable water and 750 kW of electricity. The design of NHR-10 and the safety features are described. The coupling scheme and parameters are given. Some special considerations for using in ship condition are also presented in this paper. (author)

  15. Development program for a 200-kW, c-w gyrotron. Quarterly report No. 7, January-March 1981

    International Nuclear Information System (INIS)

    Tancredi, J.J.; Caplan, M.; Sandoval, J.J.; Jordan, E.; Matranga, V.A.

    1981-01-01

    The objective of this program is the design and development of a millimeter-wave device to produce 200 kW of continuous-wave power at 60 GHz. The device, which will be a gyrotron oscillator, will be compatible with power delivery to an electron-cyclotron plasma. Smooth control of rf power output over a 17 dB range is required, and the device should be capable of operation into a severe time-varying rf load mismatch. An interim program goal is to demonstrate operation at 100 ms pulse widths by 31 December 1981. During this quarter, progress was made in the areas of tube, solenoid, and facility construction. Two magnetron injection gun assemblies were completed, and one was partially evaluated as a gun tester. The superconducting solenoid was assembled, but a vacuum leak prevented early delivery in March. Construction began on the gyrotron test facility by enclosing the area and providing bake-out and vacuum processing utilities

  16. Comparative analysis of the performance of string and central inverter topology at a large PV utility plant with varying topography

    DEFF Research Database (Denmark)

    Paasch, Kasper; Nymand, Morten; Kjær, Søren Bækhøj

    2015-01-01

    MPPT) and a series of small central inverters (60 kW, 1 MPPT) in the same PV plant under varying irradiation conditions and also including the potential detrimental effect of the horizontally tilt of the solar panels due to area topography variation. It has been shown that the gain from using multiple...

  17. Testing of a naturally aged nuclear power plant inverter and battery charger

    International Nuclear Information System (INIS)

    Gunther, W.E.

    1988-09-01

    A naturally aged inverter and battery charger were obtained from the Shippingport facility. This equipment was manufactured in 1974, and was installed at Shippingport in 1975 as part of a major plant modification. Testing was performed on this equipment under the auspices of the NRC's Nuclear Plant Aging Research (NPAR) Program to evaluate the type and extent of degradation due to aging, and to determine the effectiveness of condition monitoring techniques which could be used to detect aging effects. Steady state testing was conducted over the equipment's entire operating range. Step load changes were also initiated in order to monitor the electrical response. During this testing, component temperatures were monitored and circuit waveforms analyzed. Results indicated that aging had not substantially affected equipment operation. On the other hand, when compared with original acceptance test data, the monitoring techniques employed were sensitive to changes in measurable component and equipment parameters indicating the viability of detecting degradation prior to catastrophic failure. 7 refs., 34 figs., 12 tabs

  18. Large source test stand for H-(D-) ion source

    International Nuclear Information System (INIS)

    Larson, R.; McKenzie-Wilson, R.

    1981-01-01

    The Brookhaven National Laboratory Neutral Beam Group has constructed a large source test stand for testing of the various source modules under development. The first objective of the BNL program is to develop a source module capable of delivering 10A of H - (D - ) at 25 kV operating in the steady state mode with satisfactory gas and power efficiency. The large source test stand contains gas supply and vacuum pumping systems, source cooling systems, magnet power supplies and magnet cooling systems, two arc power supplies rated at 25 kW and 50 kW, a large battery driven power supply and an extractor electrode power supply. Figure 1 is a front view of the vacuum vessel showing the control racks with the 36'' vacuum valves and refrigerated baffles mounted behind. Figure 2 shows the rear view of the vessel with a BNL Mk V magnetron source mounted in the source aperture and also shows the cooled magnet coils. Currently two types of sources are under test: a large magnetron source and a hollow cathode discharge source

  19. Power to the people

    Energy Technology Data Exchange (ETDEWEB)

    Lawton, G.

    2002-03-02

    The Harrison family from Chester in north-west England are currently testing a 'personal' combined heat and power (CHP) plant in their garage. The CHP plant, which was supplied by the New Zealand-based company WhisperTech, produces electricity and provides space heating and hot water. The floor-mounted WhisperTech unit produces about 6 kW of heat and 1 kW of electricity. A similar wall-mounted unit developed by BG Group produces up to 15 kW of heat and 1.1 kilowatt of electricity. These personal CHP plants are based on Stirling engines built using advanced materials that can cope with the high temperatures necessary for the efficient operation required to achieve energy savings compared with conventional boilers. Some 20 WhisperTech units and 12 BG Group units have been installed in UK homes. Units have also been fitted in houses in the Netherlands. The advantages of personal CHP systems, the operation of Stirling engines and the need to remain connected to the mains are explained.

  20. Low-flow operation and testing of pumps in nuclear plants

    International Nuclear Information System (INIS)

    Greenstreet, W.L.

    1989-01-01

    Low-flow operation of centrifugal pumps introduces hydraulic instability and other factors that can cause damage to these machines. The resulting degradation has been studied and recorded for pumps in electric power plants. The objectives of this paper are to (1) describe the damage-producing phenomena, including their sources and consequences; (2) relate these observations to expectations for damage caused by low-flow operation of pumps in nuclear power plants; and (3) assess the utility of low-flow testing. Hydraulic behavior during low-flow operation is reviewed for a typical centrifugal pump stage, and the damage-producing mechanisms are described. Pump monitoring practices, in conjunction with pump performance characteristics, are considered; experience data are reviewed; and the effectiveness of low-flow surveillance monitoring is examined. Degradation caused by low-flow operation is shown to be an important factor, and low-flow surveillance testing is shown to be inadequate. 18 refs., 5 figs., 4 tabs