WorldWideScience

Sample records for interim guidance cholestyramine

  1. 78 FR 56752 - Interim Staff Guidance Specific Environmental Guidance for Integral Pressurized Water Reactors...

    Science.gov (United States)

    2013-09-13

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0211] Interim Staff Guidance Specific Environmental Guidance for Integral Pressurized Water Reactors Reviews AGENCY: Nuclear Regulatory Commission. ACTION... environmental reviews for applications for licenses to construct and operate integral pressurized water reactors...

  2. 78 FR 56750 - Interim Staff Guidance on Environmental Issues Associated With New Reactors

    Science.gov (United States)

    2013-09-13

    ... COMMISSION Interim Staff Guidance on Environmental Issues Associated With New Reactors AGENCY: Nuclear... Staff Guidance (ISG) ESP/COL-ISG-026, ``Interim Staff Guidance on Environmental Issues ] Associated with... Notice: Draft Interim Staff Guidance on Environmental Issues Associated with New Reactors. ML12326A742...

  3. 75 FR 7591 - Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and...

    Science.gov (United States)

    2010-02-22

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY RIN 2050-ZA05 Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at... draft Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive...

  4. 78 FR 67442 - Congestion Mitigation and Air Quality Improvement Program Interim Guidance

    Science.gov (United States)

    2013-11-12

    .... Bicycle and Pedestrian Facilities Programs The Interim Guidance explains that CMAQ eligibility is available to programs authorized in the bicycle and pedestrian programs governed by 23 CFR Part 652, with an... Fiscal Management Information System coding used to track mandatory and flexible CMAQ spending, including...

  5. 78 FR 72897 - Draft Guidance for Industry on Interim Product Reporting for Human Drug Compounding Outsourcing...

    Science.gov (United States)

    2013-12-04

    ...] Draft Guidance for Industry on Interim Product Reporting for Human Drug Compounding Outsourcing... Compounding Outsourcing Facilities Under Section 503B of the Federal Food, Drug, and Cosmetic Act.'' The draft... human drug compounders that choose to register as outsourcing facilities (outsourcing facilities). DATES...

  6. Physical protection of shipments of irradiated reactor fuel; Interim guidance. Regulatory report

    International Nuclear Information System (INIS)

    1980-06-01

    During May, 1979, the U.S. Nuclear Regulatory Commission approved for issuance in effective form new interim regulations for strengthening the protection of spent fuel shipments against sabotage and diversion. The new regulations were issued without benefit of public comment, but comments from the public were solicited after the effective date. Based upon the public comments received, the interim regulations were amended and reissued in effective form as a final interim rule in May, 1980. The present document supersedes a previously issued interim guidance document, NUREG-0561 (June, 1979) which accompanied the original rule. This report has been revised to conform to the new interim regulations on the physical protection of shipments of irradiated reactor fuel which are likely to remain in effect until the completion of an ongoing research program concerning the response of spent fuel to certain forms of sabotage, at which time the regulations may be rescinded, modified or made permanent, as appropriate. This report discusses the amended regulations and provides a basis on which licensees can develop an acceptable interim program for the protection of spent fuel shipments

  7. Radon Reduction Techniques in Schools: Interim Technical Guidance.

    Science.gov (United States)

    Environmental Protection Agency, Washington, DC.

    This technical document is intended to assist school facilities maintenance personnel in the selection, design, and operation of radon reduction systems in schools. The guidance contained in this document is based largely on research conducted in 1987 and 1988 in schools located in Maryland and Virginia. Researchers from the United States…

  8. 77 FR 15818 - License Renewal Interim Staff Guidance LR-ISG-2011-05: Ongoing Review of Operating Experience

    Science.gov (United States)

    2012-03-16

    ...-05: Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Interim... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-05, ``Ongoing Review of Operating Experience... industry-wide operating experience as an attribute of aging management programs used at nuclear power...

  9. Security of radioactive sources. Interim guidance for comment

    International Nuclear Information System (INIS)

    2003-06-01

    In previous IAEA publications, there have been only rather general security requirements for non-nuclear radioactive material. These requirements were primarily directed to such issues as unintentional exposure to radiation, negligence and inadvertent loss. However, it is clear that more guidance is needed to not only try and prevent further events involving orphan sources, but also to prevent the deliberate attempt to acquire radioactive sources for malevolent purposes. Member States have requested guidance on the type and nature of security measures that might be put in place and on the methodology to be used in choosing such measures. These requests were also endorsed in the findings of the international conference on 'Security of Radioactive Sources' held in March 2003. Practical advice on assessing and implementing security measures complements the general commitments in the proposed Revised Code of Conduct on Safety and Security of radioactive Sources. A Safety Guide entitled 'Safety and Security of Radiation Sources' that, amongst other things, discusses these issues is being drafted. However, it is recognized that guidance material is required before this document will be finalized in order to allow Member States opportunity to put in place appropriate actions and planning to address current issues. Hence the purpose of the current document is to provide advice on security approaches and to allow comment on detailed recommendations for levels of security on radioactive sources that may be incorporated within the Safety Guide. This report is primarily addressed to Regulatory Authorities but it is also intended to provide guidance to manufacturers, suppliers and users of sources. Its objective is to assist Member States in deciding which security measures are needed to ensure consistency with the International Basic Safety Standards and the Revised Code of Conduct for the Safety and Security of Radioactive Sources. It is recognized that there must be a

  10. Interim guidance for the safe transport of reprocessed uranium

    International Nuclear Information System (INIS)

    1994-06-01

    Increasingly reprocessed uranium is being used for the fabrication of nuclear fuel elements. Different intermediate reprocessing steps are carried out at different locations. Therefore, transportation of uranium material is necessary. Due to the difference in isotope composition of reprocessed uranium then unirradiated uranium a doubt is casted on the presumption that packages used for the transport of unirradiated uranium are automatically suitable for reprocessed uranium compounds. The Standing Advisory Group on the Safe Transport of Radioactive Material (SAGSTRAM) recommended that the issue be reviewed by consultants and that a document be developed that would give guidance to users of the Regulations. This TECDOC is the result of the endeavors of the experts convened at two Consultants Services meetings. It contains guidance on the provisions in the current Regulations as well as proposals for changes to the new Revised Edition whose publication is planned for 1996. This document demonstrates that under the present Transport Regulations it is possible in most cases to ship reprocessed uranium compounds in the same packages as unirradiated uranium compounds. In few cases a more stringent package type is required. 8 refs, 22 figs, 19 tabs

  11. 76 FR 72006 - Draft Interim Staff Guidance: Evaluations of Uranium Recovery Facility Surveys of Radon and Radon...

    Science.gov (United States)

    2011-11-21

    ... COMMISSION Draft Interim Staff Guidance: Evaluations of Uranium Recovery Facility Surveys of Radon and Radon... Recovery Facility Surveys of Radon and Radon Progeny in Air and Demonstrations of Compliance with 10 CFR 20... that existing guidance does not sufficiently detail how the NRC staff reviews surveys of radon and...

  12. Interim guidance risk assessment of the device assembly facility at the Nevada test site

    International Nuclear Information System (INIS)

    Altenbach, T.J.

    1996-05-01

    The risks of plutonium dispersal and/or high explosive detonation from nuclear explosive operations at the Device Assembly Facility were examined in accordance with DOE Order 5610.11 and the Interim Guidance. The assessment consisted of a qualitative task and hazards analysis, and a quantitative risk screening. Results are displayed on risk matrices for the major types of operations. Most accident scenarios were considered to have Low risk; a few scenarios have Moderate risk; and none have High risk. The highest risk scenarios (Moderate category) consist of a high explosive detonation during assembly operations in a cell, with bare conventional high explosive surrounding the pit

  13. The effect of cholestyramine and activated charcoal on glipizide absorption.

    Science.gov (United States)

    Kivistö, K T; Neuvonen, P J

    1990-01-01

    1. The interference of cholestyramine and activated charcoal with the absorption of glipizide was studied. 2. In a cross-over study comprising three phases, single doses of cholestyramine (8 g), activated charcoal (8 g) or water only were given to six healthy volunteers together with a single dose of glipizide. 3. The absorption of glipizide was moderately (29%, P less than 0.01) reduced by cholestyramine and greatly reduced (81%, P less than 0.01) by activated charcoal. 4. If cholestyramine and glipizide are used concomitantly, glipizide should be taken 1-2 h beforehand. In acute glipizide overdosage, activated charcoal can be used to reduce absorption. PMID:2271372

  14. Interim Consequence Management Guidance for a Wide-Area Biological Attack

    Energy Technology Data Exchange (ETDEWEB)

    Raber, Ellen [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Kirvel, Robert [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); MacQueen, Don [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Love, Adam [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Dombroski, Matthew [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); McGrann, Thomas [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Richards, John [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Melius, Carl [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bunt, Thomas [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hibbard, Wilthea [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Greenwalt, Robert [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Miles, Robin [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Dillon, Michael [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Mancieri, Sav [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Harris, Steve [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Michalik, Richard [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wheeler, Richard [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hoppes, Bill [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Tucker, Mark [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Krauter, Paula [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Knowlton, Robert [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Yang, Lynn [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Franco, Dave [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Einfeld, Wayne [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Brockman, John [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Betty, Rita [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2011-05-17

    The Interagency Biological Restoration Demonstration (IBRD) program is a collaborative, interagency effort co-chaired by the Department of Homeland Security and Department of Defense aimed at improving the nation‘s ability to respond to and recover from a large-scale, wide-area, domestic attack involving the release of an environmentally persistent biological warfare agent. The program is focused on understanding interactions between the civilian and military sectors, and in building mutual support to carry out such remediations. This Interim Consequence Management Guidance document provides guidance for decisionmakers in executing activities required to respond to and recover from a biological incident affecting a wide urban area insofar as information is currently available. The spore-forming bacterium Bacillus anthracis is discussed as the biological agent of primary concern because it is the most difficult of known bioterrorism agents to inactivate and is considered to be one of the key threat agents. Most other biological threat agents are much easier to remediate, and in many cases, inactivation would occur naturally within days as a result of environmental exposure; however, the framework and operational questions that need to be addressed are expected to remain the same. The guidance in this document is applicable to (1) enclosed facilities, such as commercial, residential, and continental U.S. military facilities; (2) semi-enclosed facilities, such as subways and public transit facilities; (3) outdoor areas (both localized and wide area), such as building exteriors, streets, parks, and other open spaces; (4) drinking water facilities; and (5) drinking water sources. This document follows an interagency framework [Planning Guidance for Recovery Following Biological Incidents (DHS and EPA 2009)]—which considered Raber et al. (2002) in its development—but takes the framework to a more operational level and provides guidance at key action and decision

  15. Control of radiation-induced diarrhea with cholestyramine

    International Nuclear Information System (INIS)

    Heusinkveld, R.S.; Manning, M.R.; Aristizabal, S.A.

    1978-01-01

    Cholestyramine is a non-absorbable ion-exchange resin which specifically binds bile salts. We have treated seven patients with acute or chronic radiation-induced diarrhea that was refractory to the usual methods of control with cholestyramine. In each case, the diarrhea was controlled with cholestyramine. This observation supports previous experimental work with animals which indicated that bile salts contribute to the genesis of radiation-induced diarrhea. Cholestyramine is well-tolerated, but should not be administered with certain oral medications. The results of this small series are preliminary, but point the way toward a more extensive clinical trial to define the usefulness of cholestyramine in the treatment of refractory acute or chronic radiation-induced diarrhea

  16. Security in the transport of radioactive material - interim guidance for comment

    International Nuclear Information System (INIS)

    Legoux, P.; Wangler, M.

    2004-01-01

    While the IAEA has provided specific guidance for physical protection in the transport of nuclear material, its previous publications have only provided some general guidelines for security of non-nuclear radioactive material in transport. Some basic practical advice has been provided in the requirements of the International Basic Safety Standards for Protection against Ionising Radiation and for the Safety of Radiation Sources (BSS) [1]. These guidelines were primarily directed toward such issues as unintentional exposure to radiation, negligence and inadvertent loss. Recently, the IAEA published a document on the security of sources, which included some general guidance on providing security during transport of the sources. However, it is clear that more guidance is needed for security during the transport of radioactive material in addition to those already existing for nuclear material. Member States have requested guidance on the type and nature of security measures that might be put in place for radioactive material in general during its transport and on the methodology to be used in choosing and implementing such measures. The purpose of the TECDOC on Security in the Transport of Radioactive Material being developed by the IAEA is to provide an initial response to that request. This interim guidance is being developed with a view to harmonizing the security guidance - as much as possible - with existing guidance from the IAEA for the transport of radioactive sources and nuclear material. It is also intended to harmonize with model requirements developed in 2002-2003 by the United Nations Economic and Social Council's Committee of Experts on the Transport of Dangerous Goods and on the Globally Harmonised System of Classification and Labelling of Chemicals which was issued as general security guidelines for all dangerous goods, including radioactive material, and that will shortly be implemented as binding regulations by the international modal authorities

  17. 75 FR 5632 - Office of New Reactors; Interim Staff Guidance on the Review of Nuclear Power Plant Designs Using...

    Science.gov (United States)

    2010-02-03

    ... COMMISSION Office of New Reactors; Interim Staff Guidance on the Review of Nuclear Power Plant Designs Using... Review of Nuclear Power Plant Designs Using a Gas Turbine Driven Standby Emergency Alternating Current... for Nuclear Power Plants (LWR Edition),'' June 2007. Background: Emergency diesel generators are...

  18. 75 FR 13610 - Office of New Reactors; Interim Staff Guidance on Implementation of a Seismic Margin Analysis for...

    Science.gov (United States)

    2010-03-22

    ... COMMISSION Office of New Reactors; Interim Staff Guidance on Implementation of a Seismic Margin Analysis for.../ COL-ISG-020 titled ``Implementation of a Seismic Margin Analysis for New Reactors Based on..., the NRC staff issued the proposed ISG, DC/COL-ISG-020 ``Implementation of a Seismic Margin Analysis...

  19. 77 FR 55232 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-03; Compliance With...

    Science.gov (United States)

    2012-09-07

    ...: Nuclear Regulatory Commission (NRC). ACTION: Japan Lessons-Learned Project Directorate Interim Staff... methodologies described in the industry guidance document, Nuclear Energy Institute (NEI) 12-02, Industry... Director, Japan Lessons-Learned Project Directorate, Office of Nuclear Reactor Regulation. BILLING CODE...

  20. 78 FR 25487 - Final License Renewal Interim Staff Guidance LR-ISG-2012-01: Wall Thinning Due to Erosion Mechanisms

    Science.gov (United States)

    2013-05-01

    ...-2012-01: Wall Thinning Due to Erosion Mechanisms AGENCY: Nuclear Regulatory Commission. ACTION: Interim... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2012-01, ``Wall Thinning Due to Erosion Mechanisms... Applications for Nuclear Power Plants'' (SRP-LR), to address wall thinning due to various erosion mechanisms...

  1. Preparation of waste analysis plans under the Resource Conservation and Recovery Act (Interim guidance)

    International Nuclear Information System (INIS)

    1993-03-01

    This document is organized to coincide with the suggested structure of the actual Waste Analysis Plans (WAP) discussed in the previous section. The contents of the remaining eleven chapters and appendices that comprise this document are described below: Chapter 2 addresses waste streams, test parameters, and rationale for sampling and analytical method selection; test methods for analyzing parameters; proceduresfor collecting representative samples; and frequency of sample collection and analyses. These are the core WAP requirements. Chapter 3 addresses analysis requirements for waste received from off site. Chapter 4addresses additional requirements for ignitable, reactive, or incompatible wastes. Chapter 5 addresses unit-specific requirements. Chapter 6 addresses special procedures for radioactive mixed waste. Chapter 7 addresses wastes subject to the land disposal restrictions. Chapter 8 addresses QA/QC procedures. Chapter 9 compares the waste analysis requirements of an interim status facility with those of a permitted facility. Chapter 10 describes the petition process required for sampling and analytical procedures to deviate from accepted methods, such as those identified in promulgated regulations. Chapter 11 reviews the process for modification of WAPs as waste type or handling practices change at a RCRA permitted TSDF. Chapter 12 is the list of references that were used in the preparation of this guidance. Appendix A is a sample WAP addressing physical/chemical treatment and container storage. Appendix B is a sample WAP addressing an incinerator and tank systems. Appendix C discusses the relationship of the WAP to other permitting requirements and includes specific examples of how waste analysis is used to comply with certain parts of a RCRA permit. Appendix D contains the exact wording for the notification/certification requirements under theland disposal restrictions

  2. 78 FR 18352 - Determination That QUESTRAN (Cholestyramine for Oral Suspension, USP), Equivalent to 4 Grams, and...

    Science.gov (United States)

    2013-03-26

    ...] Determination That QUESTRAN (Cholestyramine for Oral Suspension, USP), Equivalent to 4 Grams, and QUESTRAN LIGHT (Cholestyramine for Oral Suspension, USP), Equivalent to 4 Grams, Were Not Withdrawn From Sale for Reasons of...), equivalent to (EQ) 4 grams (g), and QUESTRAN LIGHT (cholestyramine for oral suspension, USP), EQ 4 g, were...

  3. 78 FR 40199 - Draft Spent Fuel Storage and Transportation Interim Staff Guidance

    Science.gov (United States)

    2013-07-03

    .... ML13056A516. NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room O1-F21... current or future applicants The NRC staff has no intention to impose the draft ISG positions on existing... of the effective date of this guidance The NRC staff has no intention to impose the draft ISG...

  4. 76 FR 9381 - Notice of Availability of Interim Staff Guidance Documents for Spent Fuel Storage Casks

    Science.gov (United States)

    2011-02-17

    .... FOR FURTHER INFORMATION CONTACT: Matthew Gordon, Structural Mechanics and Materials Branch, Division... transportation packaging licensing actions.'' This ISG document would provide guidance to the NRC staff when... a fee. Comments and questions on ISG-23 should be directed to Matthew Gordon, Structural Mechanics...

  5. Emergency Medical Services Public Health Implications and Interim Guidance for the Ebola Virus in the United States

    Directory of Open Access Journals (Sweden)

    Christopher E. McCoy

    2014-11-01

    Full Text Available The 25th known outbreak of the Ebola Virus Disease (EVD is now a global public health emergency and the World Health Organization (WHO has declared the epidemic to be a Public Health Emergency of International Concern (PHEIC. Since the first cases of the West African epidemic were reported in March 2014, there has been an increase in infection rates of over 13,000% over a 6-month period. The Ebola virus has now arrived in the United States and public health professionals, doctors, hospitals, Emergency Medial Services Administrators, Medical Directors, and policy makers have been working with haste to develop strategies to prevent the disease from reaching epidemic proportions. Prehospital care providers (emergency medical technicians and paramedics and medical first responders (including but not limited to firefighters and law enforcement are the healthcare systems front lines when it comes to first medical contact with patients outside of the hospital setting. Risk of contracting Ebola can be particularly high in this population of first responders if the appropriate precautions are not implemented. This article provides a brief clinical overview of the Ebola Virus Disease and provides a comprehensive summary of the Center for Disease Control and Prevention’s Interim Guidance for Emergency Medical Services (EMS Systems and 9-1-1 Public Safety Answering Points (PSAPS for Management of Patients with Known of Suspected Ebola Virus Disease in the United States. [West J Emerg Med. 2014;15(7:-0.

  6. Hyperchloremic Metabolic Acidosis due to Cholestyramine: A Case Report and Literature Review

    Directory of Open Access Journals (Sweden)

    Fareed B. Kamar

    2015-01-01

    Full Text Available Cholestyramine is a bile acid sequestrant that has been used in the treatment of hypercholesterolemia, pruritus due to elevated bile acid levels, and diarrhea due to bile acid malabsorption. This medication can rarely cause hyperchloremic nonanion gap metabolic acidosis, a complication featured in this report of an adult male with concomitant acute kidney injury. This case emphasizes the caution that must be taken in prescribing cholestyramine to patients who may also be volume depleted, in renal failure, or taking spironolactone.

  7. Interim guidance on the Standard Review Plan for the review of financial assurance mechanisms for decommissioning under 10 CFR Parts 30, 40, and 70

    International Nuclear Information System (INIS)

    1988-12-01

    Interim Guidance on the Standard Review Plan (SRP) for the Review of Financial Assurance Mechanisms for Decommissioning under 10 CFR Parts 30, 40, and 70 is prepared for the guidance of Nuclear Regulatory Commission staff reviewers in performing reviews of applications from material licensees affected by the decommissioning regulations established June 27, 1988 (53FR24018). The principal purpose of the SRP is to assure the quality and uniformity of staff reviews and to present a base from which to evaluate the financial assurance aspects of the applications. NUREG-1337, identifies who performs the review, the matters that are reviewed, the basis of the review, how the review is performed, and the conclusions that are sought. 3 refs

  8. Interim guidance on the standard format and content of financial assurance mechanisms required for decommissioning under 10 CFR Parts 30, 40, and 70

    International Nuclear Information System (INIS)

    1988-12-01

    Interim Guidance on the Standard Format and Content of Financial Assurance Mechanisms Required for Decommissioning under 10 CFR Parts 30, 40, and 70, NUREG-1336, discusses the information to be provided in a license application and established a uniform format for presenting the information required to meet the decommissioning licensing requirements. The use of the Standard Format will (1) help ensure that the license application contains the information required by the regulations, (2) aid the applicant in ensuring that the information is complete, (3) help persons reading the Standard Format to locate information, and (4) contribute to shortening the time required for the review process. The Standard Format and Content (NUREG-1336) ensures that the information required to perform the review is provided, and in a useable format

  9. Implications for Occupational Radiation Protection of the New Dose Limit for the Lens of the Eye. Interim Guidance for Use and Comment

    International Nuclear Information System (INIS)

    2013-12-01

    The IAEA Safety Requirements Safety Standards Series No. GSR Part 3 (Interim), Radiation Protection and Safety of Radiation Sources: International Basic Safety Standards, was approved by the IAEA Board of Governors at its meeting in September 2011 and published in November 2011. The equivalent dose limit for the lens of the eye for occupational exposure in planned exposure situations was reduced from 150 mSv per year to 20 mSv per year, averaged over defined periods of five years, with no annual dose in a single year exceeding 50 mSv. This reduction in the dose limit for the lens of the eye follows the recommendation of the International Commission on Radiological Protection (ICRP) in its statement on tissue reactions on 21 April 2011. At the time when the draft General Safety Requirements (GSR) Part 3 was approved by the Commission on Safety Standards, the Secretariat was asked to develop guidance as early as possible to assist Member States in the observance of the new dose limit. In the longer term, the guidance provided in this TECDOC will form the basis for the consensus guidance in relation to the new dose limit for the lens of the eye that is to be provided in two safety guides currently being developed, Occupational Radiation Protection and Radiation Safety in the Medical Uses of Ionizing Radiation. It is expected that these will be published in 2015-2016. It is recognized that guidance material is required before the two safety guides are finalized in order to give Member States the opportunity to put appropriate actions in place and to plan for the introduction of the new dose limit for the lens of the eye. The purpose of the current publication is to provide advice on the implications for occupational radiation protection of the new dose limit for the lens of the eye and to allow comment on detailed recommendations that may be incorporated into the safety guides

  10. 75 FR 8411 - Office of New Reactors: Interim Staff Guidance on Assessing the Consequences of an Accidental...

    Science.gov (United States)

    2010-02-24

    .... FOR FURTHER INFORMATION CONTACT: Mr. Edward H. Roach, Acting Chief, Health Physics Branch, Division of... staff guidance and to facilitate activities associated with review of applications for DCs and COLs by...

  11. Update: Interim Guidance for the Diagnosis, Evaluation, and Management of Infants with Possible Congenital Zika Virus Infection - United States, October 2017.

    Science.gov (United States)

    Adebanjo, Tolulope; Godfred-Cato, Shana; Viens, Laura; Fischer, Marc; Staples, J Erin; Kuhnert-Tallman, Wendi; Walke, Henry; Oduyebo, Titilope; Polen, Kara; Peacock, Georgina; Meaney-Delman, Dana; Honein, Margaret A; Rasmussen, Sonja A; Moore, Cynthia A

    2017-10-20

    CDC has updated its interim guidance for U.S. health care providers caring for infants with possible congenital Zika virus infection (1) in response to recently published updated guidance for health care providers caring for pregnant women with possible Zika virus exposure (2), unknown sensitivity and specificity of currently available diagnostic tests for congenital Zika virus infection, and recognition of additional clinical findings associated with congenital Zika virus infection. All infants born to mothers with possible Zika virus exposure* during pregnancy should receive a standard evaluation at birth and at each subsequent well-child visit including a comprehensive physical examination, age-appropriate vision screening and developmental monitoring and screening using validated tools (3-5), and newborn hearing screen at birth, preferably using auditory brainstem response (ABR) methodology (6). Specific guidance for laboratory testing and clinical evaluation are provided for three clinical scenarios in the setting of possible maternal Zika virus exposure: 1) infants with clinical findings consistent with congenital Zika syndrome regardless of maternal testing results, 2) infants without clinical findings consistent with congenital Zika syndrome who were born to mothers with laboratory evidence of possible Zika virus infection, † and 3) infants without clinical findings consistent with congenital Zika syndrome who were born to mothers without laboratory evidence of possible Zika virus infection. Infants in the first two scenarios should receive further testing and evaluation for Zika virus, whereas for the third group, further testing and clinical evaluation for Zika virus are not recommended. Health care providers should remain alert for abnormal findings (e.g., postnatal-onset microcephaly and eye abnormalities without microcephaly) in infants with possible congenital Zika virus exposure without apparent abnormalities at birth.

  12. 76 FR 35922 - Interim Staff Guidance Regarding the Environmental Report for Applications To Construct and/or...

    Science.gov (United States)

    2011-06-20

    ... Report for Applications To Construct and/or Operate Medical Isotope Production Facilities AGENCY: Nuclear... Construct and/or Operate Medical Isotope Production Facilities.'' This ISG provides guidance to the... is part of an application to construct and operate a medical isotope production facility. The draft...

  13. 76 FR 72725 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-05: Ongoing Review of Operating Experience

    Science.gov (United States)

    2011-11-25

    ...-2011-05: Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Revision... Experience.'' This LR-ISG provides guidance and clarification concerning ongoing review of plant-specific and industry-wide operating experience as an attribute of aging management programs used at nuclear power...

  14. 76 FR 58311 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-05; Ongoing Review of Operating Experience

    Science.gov (United States)

    2011-09-20

    ...-2011-05; Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Draft... Operating Experience.'' This LR-ISG provides guidance and clarification concerning ongoing review of plant-specific and industry-wide operating experience as an attribute of aging management programs used at...

  15. 77 FR 55230 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-01; Compliance With...

    Science.gov (United States)

    2012-09-07

    ... Beyond-Design-Basis External Events AGENCY: Nuclear Regulatory Commission (NRC). ACTION: Japan Lessons... industry guidance document, Nuclear Energy Institute (NEI) 12-06, Diverse and Flexible Coping Strategies... Director, Japan Lessons-Learned Project Directorate, Office of Nuclear Reactor Regulation. BILLING CODE...

  16. 77 FR 46127 - Interim Staff Guidance on Changes to the Generic Aging Lessons Learned (GALL) Report Revision 2...

    Science.gov (United States)

    2012-08-02

    ... Changes to the Generic Aging Lessons Learned (GALL) Report Revision 2 AMP XI.M41, ``Buried and Underground... Guidance (LR-ISG), LR-ISG-2011-03, ``Changes to GALL Report Revision 2 Aging Management Program (AMP) XI.M41, `Buried and Underground Piping and Tanks'.'' This LR-ISG provides changes to the recommendations...

  17. Clinical trial evaluating cholestyramine to prevent diarrhea in patients maintained on low-fat diets during pelvic radiation therapy

    International Nuclear Information System (INIS)

    Chary, S.; Thomson, D.H.

    1984-01-01

    A prospective randomized trial to determine the value of a low fat diet with or without cholestyramine in the treatment of acute intestinal complications of pelvic irradiation is presented. A total of 35 patients receiving pelvic irradiation were entered in the study and all patients had received a 40 gm fat diet. The group was then randomized to receive either placebo (17 patients) or cholestyramine (18 patients). Diarrhea occurred in six out of 16 evaluable patients in the control group and only one of the 17 evaluable patients in the cholestyramine group. The frequency of diarrhea and the diarrhea scale remained high in the placebo group in the entire observation period. Statistical analysis had revealed better diarrhea control in the cholestyramine group. In this report mechanism by which diarrhea occurs following pelvic irradiation is discussed. The adverse effects associated with the use of cholestyramine have been presented. It was concluded that cholestyramine is effective in preventing acute diarrhea induced by pelvic irradiation in patients receiving a low fat diet but is associated with side effects

  18. Treatment of Cyanobacterial (Microcystin Toxicosis Using Oral Cholestyramine: Case Report of a Dog from Montana

    Directory of Open Access Journals (Sweden)

    Michael J. Murray

    2013-05-01

    Full Text Available A two and a half year old spayed female Miniature Australian Shepherd presented to a Montana veterinary clinic with acute onset of anorexia, vomiting and depression. Two days prior, the dog was exposed to an algal bloom in a community lake. Within h, the animal became lethargic and anorexic, and progressed to severe depression and vomiting. A complete blood count and serum chemistry panel suggested acute hepatitis, and a severe coagulopathy was noted clinically. Feces from the affected dog were positive for the cyanobacterial biotoxin, microcystin-LA (217 ppb. The dog was hospitalized for eight days. Supportive therapy consisted of fluids, mucosal protectants, vitamins, antibiotics, and nutritional supplements. On day five of hospitalization, a bile acid sequestrant, cholestyramine, was administered orally. Rapid clinical improvement was noted within 48 h of initiating oral cholestyramine therapy. At 17 days post-exposure the dog was clinically normal, and remained clinically normal at re-check, one year post-exposure. To our knowledge, this is the first report of successful treatment of canine cyanobacterial (microcystin toxicosis. Untreated microcystin intoxication is commonly fatal, and can result in significant liver damage in surviving animals. The clinical success of this case suggests that oral administration of cholestyramine, in combination with supportive therapy, could significantly reduce hospitalization time, cost-of-care and mortality for microcystin-poisoned animals

  19. 77 FR 33780 - Interim Staff Guidance JLD-ISG-2012-03; Compliance with Order EA-12-051, Order Modifying Licenses...

    Science.gov (United States)

    2012-06-07

    ...: Draft Japan Lessons-Learned Project Directorate guidance; request for comment. SUMMARY: The U.S. Nuclear... described in the industry guidance document, Nuclear Energy Institute (NEI) 12-02, Industry Guidance for... Commission. David L. Skeen, Director, Japan Lessons-Learned Project Directorate, Office of Nuclear Reactor...

  20. Cholestyramine Resin

    Science.gov (United States)

    ... as atherosclerosis) decreases blood flow and, therefore, the oxygen supply to your heart, brain, and other parts ... in a large glass to avoid excessive foaming. Drink the mixture slowly. Rinse the drinking glass with ...

  1. Interim restorations.

    Science.gov (United States)

    Gratton, David G; Aquilino, Steven A

    2004-04-01

    Interim restorations are a critical component of fixed prosthodontic treatment, biologically and biomechanically. Interim restoration serves an important diagnostic role as a functional and esthetic try-in and as a blueprint for the design of the definitive prosthesis. When selecting materials for any interim restoration, clinicians must consider physical properties, handling properties, patient acceptance, and material cost. Although no single material meets all the requirements and material classification alone of a given product is not a predictor of clinical performance, bis-acryl materials are typically best suited to single-unit restorations, and poly(methylmethacrylate) interim materials are generally ideal for multi-unit, complex, long-term, interim fixed prostheses. As with most dental procedures, the technique used for fabrication has a greater effect on the final result than the specific material chosen.

  2. Bile acid sequestration by cholestyramine mitigates FGFR4 inhibition-induced ALT elevation.

    Science.gov (United States)

    Schadt, Heiko S; Wolf, Armin; Mahl, Joerg Andreas; Wuersch, Kuno; Couttet, Philippe; Schwald, Marianne; Fischer, Audrey; Lienard, Mathilde; Emotte, Corinne; Teng, Chi-Hse; Skuba, Elizabeth; Richardson, Terrilyn A; Manenti, Luigi; Weiss, Andreas; Graus Porta, Diana; Fairhurst, Robin A; Kullak-Ublick, Gerd A; Chibout, Salah-Dine; Pognan, Francois; Kluwe, William; Kinyamu-Akunda, Jacqueline

    2018-02-08

    The FGF19-FGFR4-βKlotho (KLB) pathway plays an important role in the regulation of bile acid (BA) homeostasis. Aberrant activation of this pathway has been described in the development and progression of a subset of liver cancers including hepatocellular carcinoma (HCC), establishing FGFR4 as an attractive therapeutic target for such solid tumors. FGF401 is a highly selective FGFR4 kinase inhibitor being developed for HCC, currently in Phase I/II clinical studies. In preclinical studies in mice and dogs, oral administration of FGF401 led to induction of Cyp7a1, elevation of its peripheral marker 7alpha-hydroxy-4-cholesten-3-one (C4), increased BA pool size, decreased serum cholesterol and diarrhea in dogs. FGF401 was also associated with increases of serum aminotransferases, primarily alanine aminotransferase (ALT), in the absence of any observable adverse histopathological findings in the liver, or in any other organs. We hypothesized that the increase in ALT could be secondary to increased BAs and conducted an investigative study in dogs with FGF401 and co-administration of the BA sequestrant cholestyramine (CHO). CHO prevented and reversed FGF401-related increases in ALT in dogs in parallel to its ability to reduce BAs in the circulation. Correlation analysis showed that FGF401-mediated increases in ALT strongly correlated with increases in taurolithocholic acid (TLCA) and taurodeoxycholic acid (TDCA), the major secondary BAs in dog plasma, indicating a mechanistic link between ALT elevation and changes in BA pool hydrophobicity. Thus, CHO may offer the potential to mitigate elevations in serum aminotransferases in human subjects that are caused by targeted FGFR4 inhibition and elevated intracellular BA levels. © The Author 2018. Published by Oxford University Press on behalf of the Society of Toxicology. All rights reserved. For permissions, please email: journals.permissions@oup.com.

  3. Treatment of young rats with cholestyramine or a hypercholesterolemic diet does not influence the response of serum cholesterol to dietary cholesterol in later life

    NARCIS (Netherlands)

    Beynen, A.C.; Bruijne, J.J. de; Katan, M.B.

    1985-01-01

    Groups of 10 female Wistar rats (aged 4 weeks) were fed for 29 days either a low-cholesterol commercial diet, a commercial diet containing 2% (w/w) cholesterol, 0.5% cholate and 5% olive oil or a diet containing 2% cholestyramine. The rats were then fed the low-cholesterol commercial diet for the

  4. Interim report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1985-06-01

    This Interim Report summarizes the research and development activities of the Superconducting Super Collider project carried out from the completion of the Reference Designs Study (May 1984) to June 1985. It was prepared by the SSC Central Design Group in draft form on the occasion of the DOE Annual Review, June 19--21, 1985. Now largely organized by CDG Divisions, the bulk of each chapter documents the progress and accomplishments to date, while the final section(s) describe plans for future work. Chapter 1, Introduction, provides a basic brief description of the SSC, its physics justification, its origins, and the R&D organization set up to carry out the work. Chapter 2 gives a summary of the main results of the R&D program, the tasks assigned to the four magnet R&D centers, and an overview of the future plans. The reader wishing a quick look at the SSC Phase I effort can skim Chapter 1 and read Chapter 2. Subsequent chapters discuss in more detail the activities on accelerator physics, accelerator systems, magnets and cryostats, injector, detector R&D, conventional facilities, and project planning and management. The magnet chapter (5) documents in text and photographs the impressive progress in successful construction of many model magnets, the development of cryostats with low heat leaks, and the improvement in current-carrying capacity of superconducting strand. Chapter 9 contains the budgets and schedules of the COG Divisions, the overall R&D program, including the laboratories, and also preliminary projections for construction. Appendices provide information on the various panels, task forces and workshops held by the CDG in FY 1985, a bibliography of COG and Laboratory reports on SSC and SSC-related work, and on private industrial involvement in the project.

  5. Interim format and content for a physical security plan for nuclear power plants

    International Nuclear Information System (INIS)

    1977-02-01

    The document serves as interim guidance to assist the licensee or applicant in the preparation of a physical security plan. It is to be used in conjunction with interim acceptance criteria for physical security programs, which will be distributed at a later date

  6. Grape Seed Procyanidins and Cholestyramine Differentially Alter Bile Acid and Cholesterol Homeostatic Gene Expression in Mouse Intestine and Liver.

    Directory of Open Access Journals (Sweden)

    Rebecca M Heidker

    Full Text Available Bile acid (BA sequestrants, lipid-lowering agents, may be prescribed as a monotherapy or combination therapy to reduce the risk of coronary artery disease. Over 33% of adults in the United States use complementary and alternative medicine strategies, and we recently reported that grape seed procyanidin extract (GSPE reduces enterohepatic BA recirculation as a means to reduce serum triglyceride (TG levels. The current study was therefore designed to assess the effects on BA, cholesterol and TG homeostatic gene expression following co-administration with GSPE and the BA sequestrant, cholestyramine (CHY. Eight-week old male C57BL/6 mice were treated for 4 weeks with either a control or 2% CHY-supplemented diet, after which, they were administered vehicle or GSPE for 14 hours. Liver and intestines were harvested and gene expression was analyzed. BA, cholesterol, non-esterified fatty acid and TG levels were also analyzed in serum and feces. Results reveal that GSPE treatment alone, and co-administration with CHY, regulates BA, cholesterol and TG metabolism differently than CHY administration alone. Notably, GSPE decreased intestinal apical sodium-dependent bile acid transporter (Asbt gene expression, while CHY significantly induced expression. Administration with GSPE or CHY robustly induced hepatic BA biosynthetic gene expression, especially cholesterol 7α-hydroxylase (Cyp7a1, compared to control, while co-administration further enhanced expression. Treatment with CHY induced both intestinal and hepatic cholesterologenic gene expression, while co-administration with GSPE attenuated the CHY-induced increase in the liver but not intestine. CHY also induced hepatic lipogenic gene expression, which was attenuated by co-administration with GSPE. Consequently, a 25% decrease in serum TG levels was observed in the CHY+GSPE group, compared to the CHY group. Collectively, this study presents novel evidence demonstrating that GSPE provides additive and

  7. 76 FR 75771 - Emergency Planning Guidance for Nuclear Power Plants

    Science.gov (United States)

    2011-12-05

    ... Guidance for Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Issuance of NUREG... Support of Nuclear Power Plants;'' NSIR/DPR-ISG-01, ``Interim Staff Guidance Emergency Planning for Nuclear Power Plants;'' and NUREG/CR-7002, ``Criteria for Development of Evacuation Time Estimate Studies...

  8. CMM Interim Check (U)

    Energy Technology Data Exchange (ETDEWEB)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-03-23

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length. Unfortunately, several nonconformance reports have been generated to document the discovery of a certified machine found out of tolerance during a calibration closeout. In an effort to reduce risk to product quality two solutions were proposed – shorten the calibration cycle which could be costly, or perform an interim check to monitor the machine’s performance between cycles. The CMM interim check discussed makes use of Renishaw’s Machine Checking Gauge. This off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. Data was gathered, analyzed, and simulated from seven machines in seventeen different configurations to create statistical process control run charts for on-the-floor monitoring.

  9. The Nord interim store

    International Nuclear Information System (INIS)

    Leushacke, D.F.; Rittscher, D.

    1996-01-01

    In line with the decision taken in 1990 to shut down and decommission the Greifswald and Rheinsberg Nuclear Power Stations, the waste management concept of the Energiewerke Nord is based on direct and complete decommissioning of the six shut down reactor units within the next fifteen years. One key element of this concept is the construction and use of the Zwischenlager Nord (Nord Interim Store, ZLN) for holding the existing nuclear fuels and for interim and decay storage of the radioactive materials arising in decommissioning and demolition. The owner and operator of the store is Energiewerke Nord GmbH. The interim store has the functions of a processing and Energiewerke Nord GmbH. The interim store has the functions of a processing and treatment station and buffer store for the flows of residues arising. As a radioactive waste management station, it accommodates nuclear fuels, radioactive waste or residues which are not treated any further. It is used as a buffer store to allow the materials accumulating in disassembly to be stored temporarily before or after treatment in order to ensure continuous loading of the treatment plants. When operated as a processing station, the ZLN is able to handle nearly all types of radioactive waste and residues arising, except for nuclear fuels. These installations allow the treatment of radioactive residues to be separated from the demolition work both physically and in time. The possibilities of interium storage and buffer storage of untreated waste and waste packages make for high flexibility in logistics and waste management strategy. (orig.) [de

  10. Pollution Control Guidance for Geothermal Energy Development

    Energy Technology Data Exchange (ETDEWEB)

    Hartley, Robert P.

    1978-06-01

    This report summarizes the EPA regulatory approach toward geothermal energy development. The state of knowledge is described with respect to the constituents of geothermal effluents and emissions, including water, air, solid wastes, and noise. Pollutant effects are discussed. Pollution control technologies that may be applicable are described along with preliminary cost estimates for their application. Finally discharge and emission limitations are suggested that may serve as interim guidance for pollution control during early geothermal development.

  11. Interim storage study report

    Energy Technology Data Exchange (ETDEWEB)

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration.

  12. Interim storage report

    International Nuclear Information System (INIS)

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration

  13. Interim guidance on the safe transport of uranium hexafluoride

    International Nuclear Information System (INIS)

    1991-06-01

    Uranium hexafluoride (UF 6 ) is a radioactive material that has significant non-radiological hazardous properties. In conformity with international regulatory practice for dangerous goods transport, these properties are classed as ''subsidiary risks'', although they predominate in the cases of depleted and natural UF 6 . UF 6 is transported as a solid material below atmospheric pressure. The IAEA Regulations for the Safe Transport of Radioactive Material, 1985 Edition, Safety Series No. 6, make recommendations that aimed to provide an adequate level of safety against radiological and criticality hazards. The basis for these is that the stringency of package performance requirements, operational procedures and approval and administrative procedures is graded relative to the severity of the hazard. The cylinders used for transporting UF 6 are also used in the production, storage and use of the material and that the fraction of their life cycle in which transport is involved is small. Consideration must also be given to the large number of existing cylinders (estimated to be between 60,000 and 70,000). Specific recommendations provided for UF 6 transport, listed in Section II, are additional to the requirements of the Regulations. The intent of these additional recommendations is to restrict contamination and to provide protection to workers and to the general public against the chemical hazard possibly resulting from a severe accident involving the transport of UF 6 , and in addition against the consequences of explosive rupture of small bare cylinders of UF 6 . 20 refs, figs and tabs

  14. Spent fuel interim storage

    International Nuclear Information System (INIS)

    Bilegan, Iosif C.

    2003-01-01

    The official inauguration of the spent fuel interim storage took place on Monday July 28, 2003 at Cernavoda NNP. The inaugural event was attended by local and central public authority representatives, a Canadian Government delegation as well as newsmen from local and central mass media and numerous specialists from Cernavoda NPP compound. Mr Andrei Grigorescu, State Secretary with the Economy and Commerce Ministry, underlined in his talk the importance of this objective for the continuous development of nuclear power in Romania as well as for Romania's complying with the EU practice in this field. Also the excellent collaboration between the Canadian contractor AECL and the Romanian partners Nuclear Montaj, CITON, UTI, General Concret in the accomplishment of this unit at the planned terms and costs. On behalf of Canadian delegation, spoke Minister Don Boudria. He underlined the importance which the Canadian Government affords to the cooperation with Romania aiming at specific objectives in the field of nuclear power such as the Cernavoda NPP Unit 2 and spent fuel interim storage. After traditional cutting of the inaugural ribbon by the two Ministers the festivities continued on the Cernavoda NPP Compound with undersigning the documents regarding the project completion and a press conference

  15. 78 FR 68101 - Environmental Issues Associated With New Reactors and Specific Environmental Guidance for...

    Science.gov (United States)

    2013-11-13

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0212: NRC-2013-0211] Environmental Issues Associated With New Reactors and Specific Environmental Guidance for Integral Pressurized Water Reactors Reviews... Environmental Issues Associated with New Reactors'' and draft ISG ESP/ COL-ISG-027, ``Interim Staff Guidance on...

  16. Federal Interim Storage program

    International Nuclear Information System (INIS)

    Johnson, E.R.; McBride, J.A.

    1984-01-01

    The DOE has developed a program for providing Federal Interim Storage servies for spent nuclear fuel which complies with the requirements of the Nuclear Waste Policy Act of 1982. Although very little constructive activity in providing storage facilities can be undertaken by DOE until fuel has been certified by NRC as eligible for FIS, DOE planning and background information is such as to provide reasonable assurance that its obligations can be fulfilled when the required certifications have been issued. A fee structure providing fuel recovery of all costs associated with the FIS program, as required by the Act, has been developed. It provides for an equitable distribution of costs among users, based on the quantity of fuel requiring storage

  17. Interim geotechnical data report

    International Nuclear Information System (INIS)

    1986-01-01

    This issue, the Interim Geotechnical Field Data Report, presents information obtained from the geotechnical activities at the WIPP site underground facilities since the last quarterly report. It also includes cumulative plots which contain all previous data. Finally, it continues the geotechnical analyses and interpretations of the data. The GFDR is organized into two principal parts. The first part, Geotechnical Field Data, presents in graphical form all the data collected since April 1982 from the geomechanical instruments. Presented in the second part, Evaluation and Analyses, are preliminary interpretations and analyses of the data. In this report, continuing geotechnical assessment of all the facility features is presented. Also included in the second part are separate sections on evaluation and interpretation of the instrumentation measurements, and an updated description and evaluation of observed behavior of the underground openings

  18. Preventive maintenance study : interim report.

    Science.gov (United States)

    2017-09-01

    This interim report details the performance of 69 test sites treated with various preventive maintenance treatments. The maintenance treatments applied included crack sealing, full lane chip sealing, wheel path chip sealing, dig outs (mill and fill),...

  19. Interim Design Report

    CERN Document Server

    Choubey, S.; Goswami, S.; Berg, J.S.; Fernow, R.; Gallardo, J.C.; Gupta, R.; Kirk, H.; Simos, N.; Souchlas, N.; Ellis, M.; Kyberd, P.; Benedetto, E.; Fernandez-Martinez, E.; Efthymiopoulos, I.; Garoby, R.; Gilardoni, S.; Martini, M.; Prior, G.; Ballett, P.; Pascoli, S.; Bross, A.; Geer, S.; Johnstone, C.; Kopp, J.; Mokhov, N.; Morfin, J.; Neuffer, D.; Parke, S.; Popovic, M.; Strait, J.; Striganov, S.; Blondel, A.; Dufour, F.; Laing, A.; Soler, F.J.P; Lindner, M.; Schwetz, T.; Alekou, A.; Apollonio, M.; Aslaninejad, M.; Bontoiu, C.; Dornan, P.; Eccleston, R.; Kurup, A.; Long, K.; Pasternak, J.; Pozimski, J.; Bogacz, A.; Morozov, V.; Roblin, Y.; Bhattacharya, S.; Majumdar, D.; Mori, Y.; Planche, T.; Zisman, M.; Cline, D.; Stratakis, D.; Ding, X.; Coloma, P.; Donini, A.; Gavela, B.; Lopez Pavon, J.; Maltoni, M.; Bromberg, C.; Bonesini, M.; Hart, T.; Kudenko, Y.; Mondal, N.; Antusch, S.; Blennow, M.; Ota, T.; Abrams, R.J.; Ankenbrandt, C.M.; Beard, K.B.; Cummings, M.A.C.; Flanagan, G.; Johnson, R.P.; Roberts, T.J.; Yoshikawa, C.Y.; Migliozzi, P.; Palladino, V.; de Gouvea, A.; Graves, V.B.; Kuno, Y.; Peltoniemi, J.; Blackmore, V.; Cobb, J.; Witte, H.; Mezzetto, M.; Rigolin, S.; McDonald, K.T.; Coney, L.; Hanson, G.; Snopok, P.; Tortora, L.; Andreopoulos, C.; Bennett, J.R.J.; Brooks, S.; Caretta, O.; Davenne, T.; Densham, C.; Edgecock, R.; Kelliher, D.; Loveridge, P.; McFarland, A.; Machida, S.; Prior, C.; Rees, G.; Rogers, C.; Thomason, J.W.G.; Booth, C.; Skoro, G.; Karadzhov, Y.; Matev, R.; Tsenov, R.; Samulyak, R.; Mishra, S.R.; Petti, R.; Dracos, M.; Yasuda, O.; Agarwalla, S.K.; Cervera-Villanueva, A.; Gomez-Cadenas, J.J.; Hernandez, P.; Li, T.; Martin-Albo, J.; Huber, P.; Back, J.; Barker, G.; Harrison, P.; Meloni, D.; Tang, J.; Winter, W.

    2011-01-01

    The International Design Study for the Neutrino Factory (the IDS-NF) was established by the community at the ninth "International Workshop on Neutrino Factories, super-beams, and beta- beams" which was held in Okayama in August 2007. The IDS-NF mandate is to deliver the Reference Design Report (RDR) for the facility on the timescale of 2012/13. In addition, the mandate for the study [3] requires an Interim Design Report to be delivered midway through the project as a step on the way to the RDR. This document, the IDR, has two functions: it marks the point in the IDS-NF at which the emphasis turns to the engineering studies required to deliver the RDR and it documents baseline concepts for the accelerator complex, the neutrino detectors, and the instrumentation systems. The IDS-NF is, in essence, a site-independent study. Example sites, CERN, FNAL, and RAL, have been identified to allow site-specific issues to be addressed in the cost analysis that will be presented in the RDR. The choice of example sites shou...

  20. Atmospheric Effects of Subsonic Aircraft: Interim Assessment Report of the Advanced Subsonic Technology Program

    Science.gov (United States)

    Friedl, Randall R. (Editor)

    1997-01-01

    This first interim assessment of the subsonic assessment (SASS) project attempts to summarize concisely the status of our knowledge concerning the impacts of present and future subsonic aircraft fleets. It also highlights the major areas of scientific uncertainty, through review of existing data bases and model-based sensitivity studies. In view of the need for substantial improvements in both model formulations and experimental databases, this interim assessment cannot provide confident numerical predictions of aviation impacts. However, a number of quantitative estimates are presented, which provide some guidance to policy makers.

  1. Choosing or becoming an interim administrator.

    Science.gov (United States)

    Alley, Nancy M

    2005-01-01

    Filling an administrative position on an interim basis requires careful deliberation even when the decision has to be made quickly. A poor fit, even for a short-term position, can lead to problems for the interim administrator, the subsequent permanent administrator, faculty, staff, students, and the nursing program. This article poses questions for decision makers who are contemplating filling a position with an interim appointee. These decision makers must determine the need for an interim administrator, his or her role, the anticipated length of an interim appointment, and whether the interim appointee can apply for the permanent position. In addition, relevant questions are presented for those persons who are considering accepting an interim position, including questions about the position itself and their preparation and personal goals and considerations for leaving the temporary position.

  2. Primer for the Interim Chair

    Science.gov (United States)

    Soltys, Stephen M.

    2011-01-01

    Objective: Being successful in the role of an Interim Chair requires an approach to transitional leadership that is different from that of individuals filling the Chair role permanently. This article reviews pertinent literature on the topic. Method: The author reviewed the literature, cited pertinent articles, and supplemented with personal…

  3. Interim Basis for PCB Sampling and Analyses

    International Nuclear Information System (INIS)

    BANNING, D.L.

    2001-01-01

    This document was developed as an interim basis for sampling and analysis of polychlorinated biphenyls (PCBs) and will be used until a formal data quality objective (DQO) document is prepared and approved. On August 31, 2000, the Framework Agreement for Management of Polychlorinated Biphenyls (PCBs) in Hanford Tank Waste was signed by the US. Department of Energy (DOE), the Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) (Ecology et al. 2000). This agreement outlines the management of double shell tank (DST) waste as Toxic Substance Control Act (TSCA) PCB remediation waste based on a risk-based disposal approval option per Title 40 of the Code of Federal Regulations 761.61 (c). The agreement calls for ''Quantification of PCBs in DSTs, single shell tanks (SSTs), and incoming waste to ensure that the vitrification plant and other ancillary facilities PCB waste acceptance limits and the requirements of the anticipated risk-based disposal approval are met.'' Waste samples will be analyzed for PCBs to satisfy this requirement. This document describes the DQO process undertaken to assure appropriate data will be collected to support management of PCBs and is presented in a DQO format. The DQO process was implemented in accordance with the U.S. Environmental Protection Agency EPA QAlG4, Guidance for the Data Quality Objectives Process (EPA 1994) and the Data Quality Objectives for Sampling and Analyses, HNF-IP-0842/Rev.1 A, Vol. IV, Section 4.16 (Banning 1999)

  4. ITER Conceptual design: Interim report

    International Nuclear Information System (INIS)

    1990-01-01

    This interim report describes the results of the International Thermonuclear Experimental Reactor (ITER) Conceptual Design Activities after the first year of design following the selection of the ITER concept in the autumn of 1988. Using the concept definition as the basis for conceptual design, the Design Phase has been underway since October 1988, and will be completed at the end of 1990, at which time a final report will be issued. This interim report includes an executive summary of ITER activities, a description of the ITER device and facility, an operation and research program summary, and a description of the physics and engineering design bases. Included are preliminary cost estimates and schedule for completion of the project

  5. Interim Bayesian Persuasion: First Steps

    OpenAIRE

    Perez, Eduardo

    2015-01-01

    This paper makes a first attempt at building a theory of interim Bayesian persuasion. I work in a minimalist model where a low or high type sender seeks validation from a receiver who is willing to validate high types exclusively. After learning her type, the sender chooses a complete conditional information structure for the receiver from a possibly restricted feasible set. I suggest a solution to this game that takes into account the signaling potential of the sender's choice.

  6. Burn site groundwater interim measures work plan.

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  7. 75 FR 80287 - Environmental Protection Agency Implementation of OMB Guidance on Drug-Free Workplace Requirements

    Science.gov (United States)

    2010-12-22

    ... of omnibus drug legislation on November 18, 1988. Federal agencies issued an interim final common...; FRL- 9242-2] Environmental Protection Agency Implementation of OMB Guidance on Drug-Free Workplace... Protection Agency is removing its regulation implementing the Governmentwide common rule on drug-free...

  8. Protecting the Investment: Guidance on the Storage of Packaged Wastes in the UK

    International Nuclear Information System (INIS)

    Naish, Chris; Skelton, Paul; Wisbey, Simon

    2016-01-01

    This presentation will cover: • Introduction to the UK guidance on interim storage; • Waste stores in the UK and the Store Operations Forum; • Example Approach 1 – Operational limits and conditions; • Example Approach 2 – Monitoring the evolution of package performance; • IAEA Independent peer review

  9. Career guidance in communities

    DEFF Research Database (Denmark)

    Thomsen, Rie

    in career guidance practices as well as in the lives of the people in the communities. This paper falls into two parts: The first part considers the collective as the starting point for the development of meaningful career guidance activities. Based on previous research on career guidance in communities......The aim of this paper is to inspire practitioners and professionals to leave their offices to bring career guidance into communities that might not identify with career guidance in the first instance. By making the effort to engage with communities, practitioners may bring about a critical change...... for the development of a critically reflexive career guidance practice. The considerations are organised around seven elements. 1. Creating opportunity, structure and access 2. Entering a community and increasing visibility 3. Providing guidance in communities 4. Exploring potentials in guidance situations 5...

  10. Graphical Turbulence Guidance - Composite

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Forecast turbulence hazards identified by the Graphical Turbulence Guidance algorithm. The Graphical Turbulence Guidance product depicts mid-level and upper-level...

  11. NEXT GENERATION MELTER OPTIONEERING STUDY - INTERIM REPORT

    Energy Technology Data Exchange (ETDEWEB)

    GRAY MF; CALMUS RB; RAMSEY G; LOMAX J; ALLEN H

    2010-10-19

    The next generation melter (NOM) development program includes a down selection process to aid in determining the recommended vitrification technology to implement into the WTP at the first melter change-out which is scheduled for 2025. This optioneering study presents a structured value engineering process to establish and assess evaluation criteria that will be incorporated into the down selection process. This process establishes an evaluation framework that will be used progressively throughout the NGM program, and as such this interim report will be updated on a regular basis. The workshop objectives were achieved. In particular: (1) Consensus was reached with stakeholders and technology providers represented at the workshop regarding the need for a decision making process and the application of the D{sub 2}0 process to NGM option evaluation. (2) A framework was established for applying the decision making process to technology development and evaluation between 2010 and 2013. (3) The criteria for the initial evaluation in 2011 were refined and agreed with stakeholders and technology providers. (4) The technology providers have the guidance required to produce data/information to support the next phase of the evaluation process. In some cases it may be necessary to reflect the data/information requirements and overall approach to the evaluation of technology options against specific criteria within updated Statements of Work for 2010-2011. Access to the WTP engineering data has been identified as being very important for option development and evaluation due to the interface issues for the NGM and surrounding plant. WRPS efforts are ongoing to establish precisely data that is required and how to resolve this Issue. It is intended to apply a similarly structured decision making process to the development and evaluation of LAW NGM options.

  12. Locating Interim Assessments within Teachers' Assessment Practice

    Science.gov (United States)

    Riggan, Matthew; Olah, Leslie Nabors

    2011-01-01

    Promising research on the teaching and learning impact of classroom-embedded formative assessment has spawned interest in a broader array of assessment tools and practices, including interim assessment. Although researchers have begun to explore the impact of interim assessments in the classroom, like other assessment tools and practices, they…

  13. Addendum to IFMIF-CDA interim report

    International Nuclear Information System (INIS)

    Maekawa, Hiroshi; Ida, Mizuho

    1996-08-01

    During the second IFMIF-CDA Design Integration Workshop, the conceptual design and contents of 'IFMIF-CDA Interim Report' were examined and discussed at both general and group meetings. Based on these discussion, the final IFMIF-CDA Report will be modified from the 'Interim Report'. This report describes the outline of these modification. (author)

  14. Guidelines for Preparing Interim Technical Reports

    International Development Research Centre (IDRC) Digital Library (Canada)

    IDRC CRDI

    The interim technical report explains what was achieved with the money and time spent on a project during a specific reporting period. The interim report specifically .... o knowledge creation (new knowledge embodied in forms other than publications or reports: new technologies, new methodologies, new curricula, new ...

  15. Vet Centers. Interim final rule.

    Science.gov (United States)

    2015-08-04

    The Department of Veterans Affairs (VA) is amending its medical regulation that governs Vet Center services. The National Defense Authorization Act for Fiscal Year 2013 (the 2013 Act) requires Vet Centers to provide readjustment counseling services to broader groups of veterans, members of the Armed Forces, including a member of a reserve component of the Armed Forces, and family members of such veterans and members. This interim final rule amends regulatory criteria to conform to the 2013 Act, to include new and revised definitions.

  16. Fusion Breeder Program interim report

    International Nuclear Information System (INIS)

    Moir, R.; Lee, J.D.; Neef, W.

    1982-01-01

    This interim report for the FY82 Fusion Breeder Program covers work performed during the scoping phase of the study, December, 1981-February 1982. The goals for the FY82 study are the identification and development of a reference blanket concept using the fission suppression concept and the definition of a development plan to further the fusion breeder application. The context of the study is the tandem mirror reactor, but emphasis is placed upon blanket engineering. A tokamak driver and blanket concept will be selected and studied in more detail during FY83

  17. Solid waste burial grounds interim safety analysis

    International Nuclear Information System (INIS)

    Saito, G.H.

    1994-01-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment

  18. Solid waste burial grounds interim safety analysis

    Energy Technology Data Exchange (ETDEWEB)

    Saito, G.H.

    1994-10-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment.

  19. Operator licensing examination standards for power reactors. Interim revision 8

    International Nuclear Information System (INIS)

    1997-01-01

    These examination standards are intended to assist NRC examiners and facility licensees to better understand the processes associated with initial and requalification examinations. The standards also ensure the equitable and consistent administration of examinations for all applicants. These standards are for guidance purposes and are not a substitute for the operator licensing regulations (i.e., 10 CFR Part 55), and they are subject to revision or other changes in internal operator licensing policy. This interim revision permits facility licensees to prepare their initial operator licensing examinations on a voluntary basis pending an amendment to 10 CFR Part 55 that will require facility participation. The NRC intends to solicit comments on this revision during the rulemaking process and to issue a final Revision 8 in conjunction with the final rule

  20. Glass packages in interim storage

    International Nuclear Information System (INIS)

    Jacquet-Francillon, N.

    1994-10-01

    This report summarize the current state of knowledge concerning the behavior of type C waste packages consisting of vitrified high-level solutions produced by reprocessing spent fuel. The composition and the physical and chemical properties of the feed solutions are reviewed, and the vitrification process is described. Sodium alumino-borosilicate glass compositions are generally employed - the glass used at la Hague for LWR fuel solutions, for example, contains 45 % SiO 2 . The major physical, chemical, mechanical and thermal properties of the glass are reviewed. In order to allow their thermal power to diminish, the 3630 glass packages produced (as of January 1993) in the vitrification facilities at Marcoule and La Hague are placed in interim storage for several decades. The actual interim storage period has not been defined, as it is closely related to the concept and organization selected for the final destination of the packages: a geological repository. The glass behavior under irradiation is described. Considerable basic and applied research has been conducted to assess the aqueous leaching behavior of nuclear containment glass. The effects of various repository parameters (temperature, flow rate, nature of the environmental materials) have been investigated. The experimental findings have been used to specify a model describing the kinetics of aqueous corrosion of the glass. More generally all the ''source term'' models developed in France by the CEA or by ANDRA are summarized. (author). 152 refs., 33 figs

  1. Used Fuel Logistics: Decades of Experience with transportation and Interim storage solutions

    Energy Technology Data Exchange (ETDEWEB)

    Orban, G.; Shelton, C.

    2015-07-01

    Used fuel inventories are growing worldwide. While some countries have opted for a closed cycle with recycling, numerous countries must expand their interim storage solutions as implementation of permanent repositories is taking more time than foreseen. In both cases transportation capabilities will have to be developed. AREVA TN has an unparalleled expertise with transportation of used fuel. For more than 50 years AREVA TN has safely shipped more than 7,000 used fuel transport casks. The transportation model that was initially developed in the 1970s has been adapted and enhanced over the years to meet more restrictive regulatory requirements and evolving customer needs, and to address public concerns. The numerous “lessons learned” have offered data and guidance that have allowed for also efficient and consistent improvement over the decades. AREVA TN has also an extensive experience with interim dry storage solutions in many countries on-site but also is working with partners to developed consolidated interim storage facility. Both expertise with storage and transportation contribute to safe, secure and smooth continuity of the operations. This paper will describe decades of experience with a very successful transportation program as well as interim storage solutions. (Author)

  2. DOE UST interim subsurface barrier technologies workshop

    International Nuclear Information System (INIS)

    1992-09-01

    This document contains information which was presented at a workshop regarding interim subsurface barrier technologies that could be used for underground storage tanks, particularly the tank 241-C-106 at the Hanford Reservation

  3. Aiding Vertical Guidance Understanding

    Science.gov (United States)

    Feary, Michael; McCrobie, Daniel; Alkin, Martin; Sherry, Lance; Polson, Peter; Palmer, Everett; McQuinn, Noreen

    1998-01-01

    A two-part study was conducted to evaluate modern flight deck automation and interfaces. In the first part, a survey was performed to validate the existence of automation surprises with current pilots. Results indicated that pilots were often surprised by the behavior of the automation. There were several surprises that were reported more frequently than others. An experimental study was then performed to evaluate (1) the reduction of automation surprises through training specifically for the vertical guidance logic, and (2) a new display that describes the flight guidance in terms of aircraft behaviors instead of control modes. The study was performed in a simulator that was used to run a complete flight with actual airline pilots. Three groups were used to evaluate the guidance display and training. In the training, condition, participants went through a training program for vertical guidance before flying the simulation. In the display condition, participants ran through the same training program and then flew the experimental scenario with the new Guidance-Flight Mode Annunciator (G-FMA). Results showed improved pilot performance when given training specifically for the vertical guidance logic and greater improvements when given the training and the new G-FMA. Using actual behavior of the avionics to design pilot training and FMA is feasible, and when the automated vertical guidance mode of the Flight Management System is engaged, the display of the guidance mode and targets yields improved pilot performance.

  4. Criteria for preparation and evaluation of radiological emergency response plans and preparedness in support of nuclear power plants. Interim report

    International Nuclear Information System (INIS)

    1980-01-01

    The purpose of this document is to provide a common reference and interim guidance source for: state and local governments and nuclear facility operators in the development of radiological emergency response plans and preparedness in support of nuclear power plants; and Nuclear Regulatory Commission (NRC), Federal Emergency Management Agency (FEMA) and other Federal agency personnel engaged in the review of state, local government, and licensee plans and preparedness

  5. Interim Hanford Waste Management Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The September 1985 Interim Hanford Waste Management Plan (HWMP) is the third revision of this document. In the future, the HWMP will be updated on an annual basis or as major changes in disposal planning at Hanford Site require. The most significant changes in the program since the last release of this document in December 1984 include: (1) Based on studies done in support of the Hanford Defense Waste Environmental Impact Statement (HDW-EIS), the size of the protective barriers covering contaminated soil sites, solid waste burial sites, and single-shell tanks has been increased to provide a barrier that extends 30 m beyond the waste zone. (2) As a result of extensive laboratory development and plant testing, removal of transuranic (TRU) elements from PUREX cladding removal waste (CRW) has been initiated in PUREX. (3) The level of capital support in years beyond those for which specific budget projections have been prepared (i.e., fiscal year 1992 and later) has been increased to maintain Hanford Site capability to support potential future missions, such as the extension of N Reactor/PUREX operations. The costs for disposal of Hanford Site defense wastes are identified in four major areas in the HWMP: waste storage and surveillance, technology development, disposal operations, and capital expenditures

  6. Methods Data Qualification Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    R. Sam Alessi; Tami Grimmett; Leng Vang; Dave McGrath

    2010-09-01

    The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models represent the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V&V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.

  7. Laser Guidance Analysis Facility

    Data.gov (United States)

    Federal Laboratory Consortium — This facility, which provides for real time, closed loop evaluation of semi-active laser guidance hardware, has and continues to be instrumental in the development...

  8. Optimal Aerocapture Guidance

    Data.gov (United States)

    National Aeronautics and Space Administration — The main goal of my research is to develop, implement, verify, and validate an optimal numerical predictor-corrector aerocapture guidance algorithm that is...

  9. Quieter pavements guidance document

    Science.gov (United States)

    2013-02-01

    This report provides guidance and better practice recommendations to the National Park : Service for selecting pavement surfaces to minimize tire-pavement noise. The report : contains an overview of common technologies and methods for quieter pavemen...

  10. Coral Reef Guidance

    Science.gov (United States)

    Guidance prepared by EPA and Army Corps of Engineers concerning coral reef protection under the Clean Water Act, Marine Protection, Research, and Sanctuaries Act, Rivers and Harbors Act, and Federal Project Authorities.

  11. EMCS Retrofit Analysis - Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Diamond, R.C.; Salsbury, T.I.; Bell, G.C.; Huang, Y.J.; Sezgen, A.O.; Mazzucchi, R.; Romberger, J.

    1999-03-01

    This report presents the interim results of analyses carried out in the Phillip Burton Federal Building in San Francisco from 1996 to 1998. The building is the site of a major demonstration of the BACnet communication protocol. The energy management and control systems (EMCS) in the building were retrofitted with BACnet compatible controllers in order to integrate certain existing systems on one common network. In this respect, the project has been a success. Interoperability of control equipment from different manufacturers has been demonstrated in a real world environment. Besides demonstrating interoperability, the retrofits carried out in the building were also intended to enhance control strategies and capabilities, and to produce energy savings. This report presents analyses of the energy usage of HVAC systems in the building, control performance, and the reaction of the building operators. The report does not present an evaluation of the performance capabilities of the BACnet protocol. A monitoring system was installed in the building that parallels many of the EMCS sensors and data were archived over a three-year period. The authors defined pre-retrofit and post-retrofit periods and analyzed the corresponding data to establish the changes in building performance resulting from the retrofit activities. The authors also used whole-building energy simulation (DOE-2) as a tool for evaluating the effect of the retrofit changes. The results of the simulation were compared with the monitored data. Changes in operator behavior were assessed qualitatively with questionnaires. The report summarizes the findings of the analyses and makes several recommendations as to how to achieve better performance. They maintain that the full potential of the EMCS and associated systems is not being realized. The reasons for this are discussed along with possible ways of addressing this problem. They also describe a number of new technologies that could benefit systems of the type

  12. Design review report FFTF interim storage cask

    International Nuclear Information System (INIS)

    Scott, P.L.

    1995-01-01

    Final Design Review Report for the FFTF Interim Storage Cask. The Interim Storage Cask (ISC) will be used for long term above ground dry storage of FFTF irradiated fuel in Core Component Containers (CCC)s. The CCC has been designed and will house assemblies that have been sodium washed in the IEM Cell. The Solid Waste Cask (SWC) will transfer a full CCC from the IEM Cell to the RSB Cask Loading Station where the ISC will be located to receive it. Once the loaded ISC has been sealed at the RSB Cask Loading Station, it will be transferred by facility crane to the DSWC Transporter. After the ISC has been transferred to the Interim Storage Area (ISA), which is yet to be designed, a mobile crane will be used to place the ISC in its final storage location

  13. CMM Interim Check Design of Experiments (U)

    Energy Technology Data Exchange (ETDEWEB)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-07-29

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length and include a weekly interim check to reduce risk. The CMM interim check makes use of Renishaw’s Machine Checking Gauge which is an off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. As verification on the interim check process a design of experiments investigation was proposed to test a couple of key factors (location and inspector). The results from the two-factor factorial experiment proved that location influenced results more than the inspector or interaction.

  14. Interim Administrators in Higher Education: A National Study

    Science.gov (United States)

    Huff, Marie Thielke; Neubrander, Judy

    2015-01-01

    The focus of this paper is on the roles and experiences of interim administrators in higher education. A survey was given to current and recent interim administrators in four-year public universities and colleges across the United States. The goals were to identify the advantages and disadvantages of using and serving as interims, and to solicit…

  15. Transuranic storage and assay facility interim safety basis

    Energy Technology Data Exchange (ETDEWEB)

    Porten, D.R., Fluor Daniel Hanford

    1997-02-12

    The Transuranic Waste Storage and Assay Facility (TRUSAF) Interim Safety Basis document provides the authorization basis for the interim operation and restriction on interim operations for the TRUSAF. The TRUSAF ISB demonstrates that the TRUSAF can be operated safely, protecting the workers, the public, and the environment. The previous safety analysis document TRUSAF Hazards Identification and Evaluation (WHC 1987) is superseded by this document.

  16. 13 CFR 120.890 - Source of interim financing.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Source of interim financing. 120.890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may...

  17. An Approach for Evaluating the Technical Quality of Interim Assessments

    Science.gov (United States)

    Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian

    2010-01-01

    Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…

  18. Interim financial reporting in function of proper decision making

    Directory of Open Access Journals (Sweden)

    Kaćanski Slobodan

    2014-01-01

    Full Text Available This paper analyses the attributes of interim financial reporting, as well as performs overview and interpretation of International Accounting Standard 34 which deals with this issue. The paper emphasizes risk and effects of interim financial statements implementation in decision making process. Time and cost limitations significantly influence the level of reliability on interim reports since those reports were not audited.

  19. Interim financial reporting in function of proper decision making

    OpenAIRE

    Kaćanski Slobodan; Tomašević Stevan; Vlaović-Begović Sanja

    2014-01-01

    This paper analyses the attributes of interim financial reporting, as well as performs overview and interpretation of International Accounting Standard 34 which deals with this issue. The paper emphasizes risk and effects of interim financial statements implementation in decision making process. Time and cost limitations significantly influence the level of reliability on interim reports since those reports were not audited.

  20. 216-T-4 interim stabilization final report

    International Nuclear Information System (INIS)

    Smith, D.L.

    1996-01-01

    This report provides a general description of the activities performed for the interim stabilization of the 216-T-4-1 ditch, 216-T-4-2 ditch, and 216-T-4-2 pond. Interim stabilization was required to reduce the amount of surface-contaminated acres and to minimize the migration of radioactive contamination. Work associated with the 216-T4-1 ditch and 216-T-4-2 pond was performed by the Radiation Area Remedial Action (RARA) Project. Work associated with the 216-T-4-2 ditch was done concurrently but was funded by Westinghouse Hanford Company (WHC) Tank Waste Remediation Systems (TWRS)

  1. Effectiveness of interim remedial actions at a radioactive waste facility

    International Nuclear Information System (INIS)

    Devgun, J.S.; Beskid, N.J.; Peterson, J.M.; Seay, W.M.; McNamee, E.

    1989-01-01

    Over the past eight years, several interim remedial actions have been taken at the Niagara Falls Storage Site (NFSS), primarily to reduce radon and gamma radiation exposures and to consolidate radioactive waste into a waste containment facility. Interim remedial actions have included capping of vents, sealing of pipes, relocation of the perimeter fence (to limit radon risk), transfer and consolidation of waste, upgrading of storage buildings, construction of a clay cutoff wall (to limit the potential groundwater transport of contaminants), treatment and release of contaminated water, interim use of a synthetic liner, and emplacement of an interim clay cap. An interim waste containment facility was completed in 1986. 6 refs., 3 figs

  2. 78 FR 48201 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2013-01; Guidance for...

    Science.gov (United States)

    2013-08-07

    ... resulted in a complete loss of all ac electrical power at Units 1 through 5, a condition known as station blackout. In addition, all direct current electrical power was lost early in the event on Units 1 and 2...

  3. 340 waste handling facility interim safety basis

    Energy Technology Data Exchange (ETDEWEB)

    VAIL, T.S.

    1999-04-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people.

  4. Automotive Mechanics Occupational Performance Survey. Interim Report.

    Science.gov (United States)

    Borcher, Sidney D.; Leiter, Paul B.

    The purpose of this federally-funded interim report is to present the results of a task inventory analysis survey of automotive mechanics completed by project staff within the Instructional Systems Design Program at the Center for Vocational and Technical Education. Intended for use in curriculum development for vocational education programs in…

  5. 76 FR 58790 - Notice of Interim Approval

    Science.gov (United States)

    2011-09-22

    ... customers, and the O&M Committee to ensure that operation and maintenance is properly funded and charged.... Southeastern Power Administration (Southeastern) is including three rate alternatives. All of the rate alternatives have a revenue requirement of $59,600,000. Rate Scenario 1--Interim Operating Plan The final...

  6. 45 CFR 86.71 - Interim procedures.

    Science.gov (United States)

    2010-10-01

    ... SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Procedures [Interim... Music classes, [43]; 86.34(f) Physical education, [43, 56, 58]; Sex education, [43, 57]; 86.34(e.... 901, 902, Education Amendments of 1972, 86 Stat. 373, 374; 20 U.S.C. 1681, 1682) Pt. 86, Index Subject...

  7. ITER interim design report package documents

    International Nuclear Information System (INIS)

    1996-01-01

    This publication contains the Excerpt from the ITER Council (IC-8), the ITER Interim Design Report, Cost Review and Safety Analysis, ITER Site Requirements and ITER Site Design Assumptions and the Excerpt from the ITER Council (IC-9). 8 figs, 2 tabs

  8. 340 waste handling facility interim safety basis

    International Nuclear Information System (INIS)

    VAIL, T.S.

    1999-01-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people

  9. Disposal facility data for the interim performance

    International Nuclear Information System (INIS)

    Eiholzer, C.R.

    1995-01-01

    The purpose of this report is to identify and provide information on the waste package and disposal facility concepts to be used for the low-level waste tank interim performance assessment. Current concepts for the low-level waste form, canister, and the disposal facility will be used for the interim performance assessment. The concept for the waste form consists of vitrified glass cullet in a sulfur polymer cement matrix material. The waste form will be contained in a 2 x 2 x 8 meter carbon steel container. Two disposal facility concepts will be used for the interim performance assessment. These facility concepts are based on a preliminary disposal facility concept developed for estimating costs for a disposal options configuration study. These disposal concepts are based on vault type structures. None of the concepts given in this report have been approved by a Tank Waste Remediation Systems (TWRS) decision board. These concepts will only be used in th interim performance assessment. Future performance assessments will be based on approved designs

  10. 40 CFR 180.319 - Interim tolerances.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Interim tolerances. 180.319 Section 180.319 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS... Raw agricultural commodity Coordination product of zinc ion and maneb Fungicide 1.0 (Calculated as...

  11. Interim Prosthesis Options for Dental Implants.

    Science.gov (United States)

    Siadat, Hakimeh; Alikhasi, Marzieh; Beyabanaki, Elaheh

    2017-06-01

    Dental implants have become a popular treatment modality for replacing missing teeth. In this regard, the importance of restoring patients with function during the implant healing period has grown in recent decades. Esthetic concerns, especially in the anterior region of the maxilla, should also be considered until the definitive restoration is delivered. Another indication for such restorations is maintenance of the space required for esthetic and functional definitive restorations in cases where the implant site is surrounded by natural teeth. Numerous articles have described different types of interim prostheses and their fabrication techniques. This article aims to briefly discuss all types of implant-related interim prostheses by different classification including provisional timing (before implant placement, after implant placement in unloading and loading periods), materials, and techniques used for making the restorations, the type of interim prosthesis retention, and definitive restoration. Furthermore, the abutment torque for such restorations and methods for transferring the soft tissue from interim to definitive prostheses are addressed. © 2015 by the American College of Prosthodontists.

  12. Guidance on lobbying restrictions

    Science.gov (United States)

    The purpose of this guidance is to remind nonprofit organizations, universities, and other non-government recipients of EPA grants that, with very limited exceptions, you may not use Federal grant funds or cost-sharing funds to conduct lobbying activities.

  13. Vocational Development and Guidance.

    Science.gov (United States)

    Tennyson, W. Wesley; And Others

    The vocational education volume considers questions of career development, the role of guidance in the school, vocational training, the relation of self-concept to vocational choice, and occupational information. Twenty-six papers deal with theories of vocational behavior, the success of vocational education programs, and testing information.…

  14. PIV Logon Configuration Guidance

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Glen Alan [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-03-04

    This document details the configurations and enhancements implemented to support the usage of federal Personal Identity Verification (PIV) Card for logon on unclassified networks. The guidance is a reference implementation of the configurations and enhancements deployed at the Los Alamos National Laboratory (LANL) by Network and Infrastructure Engineering – Core Services (NIE-CS).

  15. Regulatory guidance document

    International Nuclear Information System (INIS)

    1994-05-01

    The Office of Civilian Radioactive Waste Management (OCRWM) Program Management System Manual requires preparation of the OCRWM Regulatory Guidance Document (RGD) that addresses licensing, environmental compliance, and safety and health compliance. The document provides: regulatory compliance policy; guidance to OCRWM organizational elements to ensure a consistent approach when complying with regulatory requirements; strategies to achieve policy objectives; organizational responsibilities for regulatory compliance; guidance with regard to Program compliance oversight; and guidance on the contents of a project-level Regulatory Compliance Plan. The scope of the RGD includes site suitability evaluation, licensing, environmental compliance, and safety and health compliance, in accordance with the direction provided by Section 4.6.3 of the PMS Manual. Site suitability evaluation and regulatory compliance during site characterization are significant activities, particularly with regard to the YW MSA. OCRWM's evaluation of whether the Yucca Mountain site is suitable for repository development must precede its submittal of a license application to the Nuclear Regulatory Commission (NRC). Accordingly, site suitability evaluation is discussed in Chapter 4, and the general statements of policy regarding site suitability evaluation are discussed in Section 2.1. Although much of the data and analyses may initially be similar, the licensing process is discussed separately in Chapter 5. Environmental compliance is discussed in Chapter 6. Safety and Health compliance is discussed in Chapter 7

  16. The Counseling & Guidance Curriculum.

    Science.gov (United States)

    Ediger, Marlow

    Counseling and guidance services are vital in any school curriculum. Counselors may themselves be dealing with students of diverse abilities and handicaps. Counselors may have to work with students affected by drug addiction, fetal alcohol syndrome, homelessness, poverty, Acquired Immune Deficiency Syndrome (AIDS) and divorce. Students may present…

  17. Career guidance on the move

    DEFF Research Database (Denmark)

    Thomsen, Rie

    2013-01-01

    This article is about how the notion of place can be used in an analysis of career guidance practices and their development. It is about how a focus on the context of career guidance can develop an awareness of the place where guidance is practiced and support the development of career guidance i...... in new places. In this article I introduce an analytical perspective on place; I give the example of the guidance café a practice development that took place into serious consideration because it was an attempt to develop career guidance practice through relocating it....

  18. Islamic Guidance for Drug Addiction

    Directory of Open Access Journals (Sweden)

    Agus Supriyanto

    2016-10-01

    Full Text Available Islamic Guidance is social rehabilitation program for Drug Addiction (resident. The goal of this research to know the Islamic guidance for resident at the Center for Rehabilitation of the National Narcotics Agency Lido Bogor. The methodology in this research is qualitative descriptive, with a sample two religious counselor. Can be concluded that Islamic guidance is implemented with the classical format, group format, and individual formats. The goal of the Islamic Guidance to develop religious mentally.

  19. Employee commute options guidance

    International Nuclear Information System (INIS)

    1992-12-01

    The Clean Air Act Amendments of 1990 (CAAA) require severe and extreme ozone nonattainment areas and serious carbon monoxide nonattainment areas to establish programs aimed at reducing commute trips to the worksites of large employers. The concerns that lead to the inclusion of the Employee Commute Options (ECO) provision in the Act are that more people are driving than ever before and they are driving longer distances. The purpose of the guidance is to inform the affected State and local jurisdictions of the Clean Air Act requirement, to provide guidance on preparing an approvable State Implementation Plan (SIP) revision, and to discuss various approaches which may help areas achieve Clean Air Act targets through implementation strategies that are the least burdensome and costly to both affected employers and employees

  20. Environmental guidance regulatory bulletin

    International Nuclear Information System (INIS)

    1997-01-01

    This document describes the background on expanding public participation in the Resource Conservation and Recovery Act and DOE's response. The bulletin also describes the changes made by the final rule to existing regulations, guidance provided by EPA in the preamble and in the revised RCRA Public Participation Manual, the relationship between public participation and environmental justice, and DOE's recent public participation and environmental justice initiatives

  1. Pathways to deep decarbonization - Interim 2014 Report

    International Nuclear Information System (INIS)

    2014-01-01

    The interim 2014 report by the Deep Decarbonization Pathways Project (DDPP), coordinated and published by IDDRI and the Sustainable Development Solutions Network (SDSN), presents preliminary findings of the pathways developed by the DDPP Country Research Teams with the objective of achieving emission reductions consistent with limiting global warming to less than 2 deg. C. The DDPP is a knowledge network comprising 15 Country Research Teams and several Partner Organizations who develop and share methods, assumptions, and findings related to deep decarbonization. Each DDPP Country Research Team has developed an illustrative road-map for the transition to a low-carbon economy, with the intent of taking into account national socio-economic conditions, development aspirations, infrastructure stocks, resource endowments, and other relevant factors. The interim 2014 report focuses on technically feasible pathways to deep decarbonization

  2. Gaz de France interim financial report 2007

    International Nuclear Information System (INIS)

    2007-01-01

    This financial report contains the unaudited condensed financial statements of Gaz de France Group for the first half ended June 30, 2007, which were reviewed by the audit committee on August 27, 2007 and by the board of directors at its meeting on August 28, 2007. It includes forward-looking statements concerning the objectives, strategies, financial position, future operating results and the operations of Gaz de France Group. These statements reflect the Group's current perception of its activities and the markets in which it operates, as well as various estimates and assumptions considered to be reasonable. Content: interim management report (highlights of the first half of 2007, revenues and results for the period, financial structure, data on outstanding stock, outlook); interim consolidated financial statements (consolidated statements of income, consolidated balance sheets, consolidated statements of cash flows, recognized income and expenses, statements of changes in shareholders' equity, note to the consolidated financial statements); statement by the person responsible for the interim financial report; statutory auditors' report. (J.S.)

  3. The Interim Financial Statements: The Case of Greece

    OpenAIRE

    Rogdaki, E.I.; Kazantzis, Ch.

    1999-01-01

    The following paper refers to the accounting and auditing issues which emerge in the preparation of the interim financial statements of the companies: Firstly, the interim financial statements are defined as being the financial statements that provide useful information about the financial position and the financial results of a company which are realized and accrued during the fiscal year. The interim financial statements can be prepared on a monthly basis, on a quarterly basis or covering a...

  4. 78 FR 13073 - Interim Guidance for Revised Implementation of the International Convention for the Prevention of...

    Science.gov (United States)

    2013-02-26

    .... flagged ships and fixed or floating platforms are expected to meet the requirements of the amended MARPOL... educational outreach and awareness approach. Additionally, current enforcement options remain in place for...

  5. 75 FR 45678 - Notice of Availability of Interim Staff Guidance Document for Fuel Cycle Facilities

    Science.gov (United States)

    2010-08-03

    ... section, however substantial edits were made. The use of the concept ``creditable controls'' and the term... documents. These documents may be accessed through the NRC's Public Electronic Reading Room on the Internet at http://www.nrc.gov/reading-rm/adams.html . The ADAMS accession number for the document related to...

  6. 77 FR 62596 - Interim Guidance on State Freight Plans and State Freight Advisory Committees

    Science.gov (United States)

    2012-10-15

    ... of good repair, livability, and environmental sustainability. State Freight Plans can also identify... analysis would show what the strengths of the State's freight system are that the State wishes to build.../freight/freight_analysis/data_sources/index.htm Freight Analysis Framework: http://www.ops.fhwa.dot.gov...

  7. Interim Guidance for the Sanitary Control and Surveillance of Field Water Supplies

    Science.gov (United States)

    2005-07-15

    Additionally, flies can spread cysts. Susceptibility is general. b. Campylobacteriosis . The majority of all Campylobacter infections are caused by the...contract Campylobacteriosis are at risk of developing sepsis. In some cases, infection leads to Guillain-Barre syndrome which is a temporary paralysis

  8. Interim Guidance for Oil Heating Equipment Selection for Naval Residential Housing.

    Science.gov (United States)

    1984-01-01

    Minneapolis, Minnesota -16 Des Moines, Iowa -10 Washington, D.C. 14 Raleigh, North Carolina 16 Spokane, Washington -6 Portland, Oregon 17 P.. STEP 3...BURNER C-56 ’a.- MANUAL NO. 17,000/500019-82 INSTALLATION SERVICE AND OPERATING MANUAL ,-RTLI AMERICAN OIL BURNER MODELOE -2 12 6 ,-p. -~ OE-22 I . 6 _ _ OE

  9. PSD Increment Consumption Guidance

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  10. International Peer Review of Swedish Nuclear Fuel and Waste Management Company's SR-Can interim report

    International Nuclear Information System (INIS)

    Sagar, Budhi; Bailey, Lucy; Bennett, David G.; Egan, Mike; Roehlig, Klaus

    2004-12-01

    SKB has produced an interim safety assessment report as part of its work to develop a licence application for the construction of a spent nuclear fuel encapsulation plant. The purpose of the interim report is to set out and demonstrate SKB's proposed methodology for long-term safety assessment. The aim of producing an interim report is to allow the Swedish regulatory authorities (SKI and SSI) to review and comment on SKB's proposed methodology before it is used in support of a formal licence application. To help inform their review of SKB's proposed methodology, the authorities appointed an international review team (IRT) to carry out a review of SKB's interim safety assessment report. Comments from the IRT are presented in this document and will be considered by the regulatory authorities in developing their own view of SKB's proposed methodology. The IRT's review included examination of SKB's documentation (the 'Interim Main Report of the Safety Assessment SR-Can' and four supporting documents) and hearings with SKB staff and contractors. The hearings provided an opportunity for the IRT to discuss the SR-Can safety assessment with the authors and contributors to SKB's work. As directed by SKI and SSI, the IRT's review focused on methodological aspects and sought to determine whether SKB's proposed safety assessment methodology: (i) is fit for the purpose of supporting a licence application; (ii) has a reasonable prospect of leading to a safety assessment that is sufficiently comprehensive, reproducible, traceable and transparent; (iii) is compatible with the authorities' regulations and guidance. No evaluation of long term safety or site acceptability was attempted by the IRT. At the request of SKI and SSI, the IRT's review considered and made recommendations on the following issues: Description of the initial state of the repository and its components; Description of features, events and processes (FEPs) relevant to repository evolution; Strategy for safety

  11. 78 FR 70244 - Electronic Interim Assistance Reimbursement Program

    Science.gov (United States)

    2013-11-25

    ... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 416 [Docket No. SSA-2011-0104] RIN 0960-AH45 Electronic Interim Assistance Reimbursement Program AGENCY: Social Security Administration. ACTION: Notice of proposed rulemaking (NPRM). SUMMARY: We reimburse States that provide interim assistance to Supplemental...

  12. Decision on performing interim analysis for comparative clinical trials.

    Science.gov (United States)

    Pak, Kyongsun; Jacobus, Susanna; Uno, Hajime

    2017-09-01

    In randomized-controlled trials, interim analyses are often planned for possible early trial termination to claim superiority or futility of a new therapy. While unblinding is necessary to conduct the formal interim analysis in blinded studies, blinded data also have information about the potential treatment difference between the groups. We developed a blinded data monitoring tool that enables investigators to predict whether they observe such an unblinded interim analysis results that supports early termination of the trial. Investigators may skip some of the planned interim analyses if an early termination is unlikely. We specifically focused on blinded, randomized-controlled studies to compare binary endpoints of a new treatment with a control. Assuming one interim analysis is planned for early termination for superiority or futility, we conducted extensive simulation studies to assess the impact of the implementation of our tool on the size, power, expected number of interim analyses, and bias in the treatment effect. The numerical study showed the proposed monitoring tool does not affect size or power, but dramatically reduces the expected number of interim analyses when the effect of the treatment difference is small. The tool serves as a useful reference when interpreting the summary of the blinded data throughout the course of the trial, without losing integrity of the study. This tool could potentially save the study resources and budget by avoiding unnecessary interim analyses.

  13. Transuranic waste storage and assay facility (TRUSAF) interim safety basis

    International Nuclear Information System (INIS)

    Gibson, K.D.

    1995-09-01

    The TRUSAF ISB is based upon current facility configuration and procedures. The purpose of the document is to provide the basis for interim operation or restrictions on interim operations and the authorization basis for the TRUSAF at the Hanford Site. The previous safety analysis document TRUSAF hazards Identification and Evaluation (WHC 1977) is superseded by this document

  14. 28 CFR 94.41 - Interim emergency payment.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  15. General certification procedure of enterprises and interim job enterprises

    CERN Document Server

    Int. At. Energy Agency, Wien

    2002-01-01

    This procedure defines the certification global process of enterprises employing workers of A or B category for nuclear facilities and interim job enterprises proposing workers of A or B category for nuclear facilities. This certification proves the enterprises ability to satisfy the specification ''E'' of the CEFRI and the interim job enterprises to satisfy the specification ''I'' of the CEFRI. (A.L.B.)

  16. Presidential Transition: The Experience of Two Community College Interim Presidents

    Science.gov (United States)

    Thompson, Matthew D.

    2010-01-01

    The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…

  17. 50 CFR 660.720 - Interim protection for sea turtles.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 9 2010-10-01 2010-10-01 false Interim protection for sea turtles. 660.720 Section 660.720 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707...

  18. The Homestake Interim Laboratory and Homestake DUSEL

    Science.gov (United States)

    Lesko, Kevin T.

    2011-12-01

    The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for

  19. The Homestake Interim Laboratory and Homestake DUSEL

    International Nuclear Information System (INIS)

    Lesko, Kevin T.

    2011-01-01

    The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for

  20. Central waste complex interim safety basis

    International Nuclear Information System (INIS)

    Cain, F.G.

    1995-01-01

    This interim safety basis provides the necessary information to conclude that hazards at the Central Waste Complex are controlled and that current and planned activities at the CWC can be conducted safely. CWC is a multi-facility complex within the Solid Waste Management Complex that receives and stores most of the solid wastes generated and received at the Hanford Site. The solid wastes that will be handled at CWC include both currently stored and newly generated low-level waste, low-level mixed waste, contact-handled transuranic, and contact-handled TRU mixed waste

  1. Central waste complex interim safety basis

    Energy Technology Data Exchange (ETDEWEB)

    Cain, F.G.

    1995-05-15

    This interim safety basis provides the necessary information to conclude that hazards at the Central Waste Complex are controlled and that current and planned activities at the CWC can be conducted safely. CWC is a multi-facility complex within the Solid Waste Management Complex that receives and stores most of the solid wastes generated and received at the Hanford Site. The solid wastes that will be handled at CWC include both currently stored and newly generated low-level waste, low-level mixed waste, contact-handled transuranic, and contact-handled TRU mixed waste.

  2. 50 CFR 259.30 - Application for Interim Capital Construction Fund Agreement (“Interim CCF Agreement”).

    Science.gov (United States)

    2010-10-01

    ...) Date of construction, acquisition, or reconstruction, (vii) Fishery of operation (which in this section... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Application for Interim Capital Construction Fund Agreement (âInterim CCF Agreementâ). 259.30 Section 259.30 Wildlife and Fisheries NATIONAL...

  3. FY17 Status Report: Research on Stress Corrosion Cracking of SNF Interim Storage Canisters.

    Energy Technology Data Exchange (ETDEWEB)

    Schindelholz, Eric John [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bryan, Charles R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Alexander, Christopher L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-09-01

    This progress report describes work done in FY17 at Sandia National Laboratories (SNL) to assess the localized corrosion performance of container/cask materials used in the interim storage of spent nuclear fuel (SNF). Of particular concern is stress corrosion cracking (SCC), by which a through-wall crack could potentially form in a canister outer wall over time intervals that are shorter than possible dry storage times. Work in FY17 refined our understanding of the chemical and physical environment on canister surfaces, and evaluated the relationship between chemical and physical environment and the form and extent of corrosion that occurs. The SNL corrosion work focused predominantly on pitting corrosion, a necessary precursor for SCC, and process of pit-to-crack transition; it has been carried out in collaboration with university partners. SNL is collaborating with several university partners to investigate SCC crack growth experimentally, providing guidance for design and interpretation of experiments.

  4. Interstitial guidance of cancer invasion.

    Science.gov (United States)

    Gritsenko, Pavlo G; Ilina, Olga; Friedl, Peter

    2012-01-01

    Cancer cell invasion into healthy tissues develops preferentially along pre-existing tracks of least resistance, followed by secondary tissue remodelling and destruction. The tissue scaffolds supporting or preventing guidance of invasion vary in structure and molecular composition between organs. In the brain, the guidance is provided by myelinated axons, astrocyte processes, and blood vessels which are used as invasion routes by glioma cells. In the human breast, containing interstitial collagen-rich connective tissue, disseminating breast cancer cells preferentially invade along bundled collagen fibrils and the surface of adipocytes. In both invasion types, physical guidance prompted by interfaces and space is complemented by molecular guidance. Generic mechanisms shared by most, if not all, tissues include (i) guidance by integrins towards fibrillar interstitial collagen and/or laminins and type IV collagen in basement membranes decorating vessels and adipocytes, and, likely, CD44 engaging with hyaluronan; (ii) haptotactic guidance by chemokines and growth factors; and likely (iii) physical pushing mechanisms. Tissue-specific, resticted guidance cues include ECM proteins with restricted expression (tenascins, lecticans), cell-cell interfaces, and newly secreted matrix molecules decorating ECM fibres (laminin-332, thrombospondin-1, osteopontin, periostin). We here review physical and molecular guidance mechanisms in interstitial tissue and brain parenchyma and explore shared principles and organ-specific differences, and their implications for experimental model design and therapeutic targeting of tumour cell invasion. Copyright © 2011 Pathological Society of Great Britain and Ireland. Published by John Wiley & Sons, Ltd.

  5. The Importance of Effective Guidance

    Science.gov (United States)

    Cullen, Bud

    1977-01-01

    In an address to the Canadian Guidance and Counselling Association, the Canadian Manpower and Immigration Minister emphasized the importance of vocational guidance for high school students. He cited the need for communication between the worlds of education and work, promotion of better cooperative programs, and subsidized job training for youth.…

  6. Guidance: Agent of the Counterculture.

    Science.gov (United States)

    Patouillet, Raymond A.; Marin, Roselyn L.

    1979-01-01

    This article was an introduction to a convention program presented at the Florida Personnel and Guidance Association Convention (Tampa, Nov., 1977) by Raymond Patouillet, shortly before his sudden death. It encapsulates his guidance philosophy, his understanding of the human condition, and his faith in the crucial role of the caring profession.…

  7. RH Packaging Program Guidance

    International Nuclear Information System (INIS)

    2008-01-01

    The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the RH-TRU 72-B Waste Shipping Package (also known as the 'RH-TRU 72-B cask') and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: 'each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.' It further states: 'each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.' Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M and O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) 71.8, 'Deliberate Misconduct.' Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.In accordance with 10 CFR Part 71, 'Packaging and Transportation of Radioactive Material,' certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, 'Reporting of Defects and Noncompliance,' regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous

  8. RH Packaging Program Guidance

    International Nuclear Information System (INIS)

    2006-01-01

    The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the RH-TRU 72-B Waste Shipping Package and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: 'each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.' It further states: 'each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.' Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M and O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with 10 Code of Federal Regulations (CFR) 1.8, 'Deliberate Misconduct.' Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, 'Packaging and Transportation of Radioactive Material,' certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, 'Reporting of Defects and Noncompliance,' regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these

  9. International guidance activities

    International Nuclear Information System (INIS)

    Richardson, Allan C.B.

    1989-01-01

    International principles for setting Protective Action Guides (PAGs) are contained in two key documents that contain identical statements. One is Publication Number 40 of the ICRP, which was issued in 1985. The title is 'Protection of the Public in the Event of Major Radiation Accidents, Principles for Planning'. The other is the IAEA's Safety Series Publication Number 72, also issued in 1985, written by many of the same authors and titled, 'Principles for Establishing Intervention Levels'. The principles that were set forth in these documents were identical, were incomplete, and they are, unfortunately, the only principles that are now in effect, while proposed revisions go through one draft after another. There are several such draft revisions that are of significance. The most important is that of the ICRP. The basic guidance that applies to most planned exposure to radiation is ICRP Publication 26. That document has been under revision by the Commission for a number of years, and the new version will, for the first time, include recommendations for emergency response. They are now getting close to closure, and I think it should be a very much improved and useful document. But it isn't finished yet. Such guidance doesn't get developed in a vacuum, and there have been a couple of parallel efforts which have provided significant input to the ICRP, which is essentially a behind-closed-doors effort. These other efforts are more open. One of these is being carried out within the IAEA, which has convened annual meetings of national experts for a number of years in Vienna, to generate a replacement for Safety Series No. 72, mentioned earlier. There is a meeting scheduled this December to complete this effort; and, hopefully, we will reach closure at that meeting on at least the basic principles. The Nuclear Energy Agency (NEA) has also been at work. It has convened a group of experts from member nations that have been developing recommendations. There is an overlap

  10. RH Packaging Program Guidance

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2008-01-12

    The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the RH-TRU 72-B Waste Shipping Package (also known as the "RH-TRU 72-B cask") and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: "...each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "...each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliance," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a

  11. RH Packaging Program Guidance

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2006-11-07

    The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the RH-TRU 72-B Waste Shipping Package and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: "...each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "...each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with 10 Code of Federal Regulations (CFR) §71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliance," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to

  12. Plowshare radiation protection guidance

    International Nuclear Information System (INIS)

    Parker, H.M.

    1969-01-01

    The recommendations of the ICRP and the NCRP were developed primarily for occupational radiation exposures. They were later modified and applied to non-occupational exposures of populations. These, with appropriate interpretations, can be used to provide Plowshare radiation protection guidance. Exposures from Plowshare operations will tend to be acute, arising from radionuclides of relatively short half-life, but will have some chronic aspects due to small amounts of long-lived radionuclides generated. In addition, the neutron activation process of Plowshare technology will produce radionuclides not commonly encountered in routine nuclear energy programs. How these radionuclides contribute to personnel exposure is known for only a few situations that may not be representative of Plowshare exposure. Further complications arise from differences in radionuclide deposition and physiological sensitivity among individuals of different ages and states of health in the exposed population. All parameters necessary to evaluate such exposures are not available, even for good quantitative approximations, resulting in the need for interpretive experience. (author)

  13. A novel speech prosthesis for mandibular guidance therapy in hemimandibulectomy patient: A clinical report

    Directory of Open Access Journals (Sweden)

    Raghavendra Adaki

    2016-01-01

    Full Text Available Treating diverse maxillofacial patients poses a challenge to the maxillofacial prosthodontist. Rehabilitation of hemimandibulectomy patients must aim at restoring mastication and other functions such as intelligible speech, swallowing, and esthetics. Prosthetic methods such as palatal ramp and mandibular guiding flange reposition the deviated mandible. Such prosthesis can also be used to restore speech in case of patients with debilitating speech following surgical resection. This clinical report gives detail of a hemimandibulectomy patient provided with an interim removable dental speech prosthesis with composite resin flange for mandibular guidance therapy.

  14. Retention of long-term interim restorations with sodium fluoride enriched interim cement

    Science.gov (United States)

    Strash, Carolyn

    Purpose: Interim fixed dental prostheses, or "provisional restorations", are fabricated to restore teeth when definitive prostheses are made indirectly. Patients undergoing extensive prosthodontic treatment frequently require provisionalization for several months or years. The ideal interim cement would retain the restoration for as long as needed and still allow for ease of removal. It would also avoid recurrent caries by preventing demineralization of tooth structure. This study aims to determine if adding sodium fluoride varnish to interim cement may assist in the retention of interim restorations. Materials and methods: stainless steel dies representing a crown preparation were fabricated. Provisional crowns were milled for the dies using CAD/CAM technology. Crowns were provisionally cemented onto the dies using TempBond NE and NexTemp provisional cements as well as a mixture of TempBond NE and Duraphat fluoride varnish. Samples were stored for 24h then tested or thermocycled for 2500 or 5000 cycles before being tested. Retentive strength of each cement was recorded using a universal testing machine. Results: TempBond NE and NexTemp cements performed similarly when tested after 24h. The addition of Duraphat significantly decreased the retention when added to TempBond NE. NexTemp cement had high variability in retention over all tested time periods. Thermocycling for 2500 and 5000 cycles significantly decreased the retention of all cements. Conclusions: The addition of Duraphat fluoride varnish significantly decreased the retention of TempBond NE and is therefore not recommended for clinical use. Thermocycling significantly reduced the retention of TempBond NE and NexTemp. This may suggest that use of these cements for three months, as simulated in this study, is not recommended.

  15. PROJECT W-551 INTERIM PRETREATMENT SYSTEM PRECONCEPTUAL CANDIDATE TECHNOLOGY DESCRIPTIONS

    Energy Technology Data Exchange (ETDEWEB)

    MAY TH

    2008-08-12

    The Office of River Protection (ORP) has authorized a study to recommend and select options for interim pretreatment of tank waste and support Waste Treatment Plant (WTP) low activity waste (LAW) operations prior to startup of all the WTP facilities. The Interim Pretreatment System (IPS) is to be a moderately sized system which separates entrained solids and 137Cs from tank waste for an interim time period while WTP high level waste vitrification and pretreatment facilities are completed. This study's objective is to prepare pre-conceptual technology descriptions that expand the technical detail for selected solid and cesium separation technologies. This revision includes information on additional feed tanks.

  16. General RMP Guidance - Appendix D: OSHA Guidance on PSM

    Science.gov (United States)

    OSHA's Process Safety Management (PSM) Guidance on providing complete and accurate written information concerning process chemicals, process technology, and process equipment; including process hazard analysis and material safety data sheets.

  17. Regulatory guidance for license renewal

    International Nuclear Information System (INIS)

    Thoma, John A.

    1991-01-01

    The proposed 10 CFR Part 54 rule proceduralizes the process for license renewal by identifying both the administrative and technical requirements for a renewal application. To amplify and support this regulation, written guidance has been provided in the form of a draft Regulatory Guide (DG 1009) and a draft Standard Review Plan for License Renewal (NUREG 1299). This guidance is scheduled to be finalized in 1992. Similar guidance will be provided for the proposed revisions to 10 CFR Part 51 concerning the environmental aspects of license renewal. (author)

  18. RH Packaging Program Guidance

    International Nuclear Information System (INIS)

    Washington TRU Solutions, LLC

    2003-01-01

    The purpose of this program guidance document is to provide technical requirements for use, operation, inspection, and maintenance of the RH-TRU 72-B Waste Shipping Package and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the SARP and/or C of C shall govern. The C of C states: ''...each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, ''Operating Procedures,'' of the application.'' It further states: ''...each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, ''Acceptance Tests and Maintenance Program of the Application.'' Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M and O) contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC approved, users need to be familiar with 10 CFR (section) 71.11, ''Deliberate Misconduct.'' Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. CBFO will evaluate the issue and notify the NRC if required. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions. Following these instructions assures that operations are safe and meet the requirements of the SARP. This document is available on the Internet at: ttp://www.ws/library/t2omi/t2omi.htm. Users are responsible for ensuring they are using the current revision and change notices. Sites may prepare their own document using the word

  19. CAREER GUIDANCE EXPERIENCE ABROAD

    Directory of Open Access Journals (Sweden)

    Sergey N. Tolstoguzov

    2015-01-01

    Full Text Available The aim of this paper is to describe the experience of careeroriented activities carried out with students of schools in developed and developing countries. Career Guidance in Russia, despite the vast experience of its implementation, is experiencing serious difficulties. In this regard, it is important to take into account the international experience career-oriented activities, such as in the developed countries of North America and the European Union as well as in several Asian countries with rapidly growing economies and a large demographic potential, taking into account the best variants for the Russian education system. Methods. The experience of career-oriented work undertaken with pupils of the USA, Canada, Israel, France, UK, Germany, Denmark, Sweden, Japan, Singapore, China and India is shown on the basis of the comparative analysis of different publications and information sources. The author has made an attempt to generalize the principles of psycho-pedagogical and administrative assistance in professional self-determination of senior pupils abroad. Scientific novelty. The approaches to career-oriented activities in countries with different levels of economic development are compared for the first time. Some principles are revealed. Firstly, the higher the income level per capita in the country, the greater attention is given to vocational guidance. The politics in the developed countries is based on interests of the individual: children’s acquaintance with the world of professions begins already at younger school and the moment of definitive selfdetermination is postponed till the end of their senior stage of education; the possibility of direction change of professional preparation in case of detection of discrepancy of qualities of the pupil to originally selected profile is provided. Career-oriented activity in developing countries, on the contrary, is rigidly coordinated to requirements of economy and a labour market

  20. Interim report and accounts 1993/94

    International Nuclear Information System (INIS)

    1993-01-01

    An interim set of accounts and reports is presented here for 1993/1994 for the health science company Amersham International. The company's research programs focus on developments in life science research, nuclear medicine and industrial quality and safety assurance, with particular expertise in the application of radioactivity to labelling and detection at the molecular level. This report which covers the half-year to 30 September 1993 shows promising financial results, with turnover, operating profits and earnings per share all having risen. All life science markets report growth although difficult trading conditions are being reported in Europe. Two products in the Healthcare business have achieved progress, a pain palliation agent for bone metastases has been launched in the United States, and European approval has been gained for a new technetium based heart imaging agent. Further growth is expected for the company. (UK)

  1. Interim Hanford Waste Management Technology Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Interim Hanford Waste Management Technology Plan (HWMTP) is a companion document to the Interim Hanford Waste Management Plan (HWMP). A reference plan for management and disposal of all existing and certain projected future radioactive Hanford Site Defense Wastes (HSDW) is described and discussed in the HWMP. Implementation of the reference plan requires that various open technical issues be satisfactorily resolved. The principal purpose of the HWMTP is to present detailed descriptions of the technology which must be developed to close each of the technical issues associated with the reference plan identified in the HWMP. If alternative plans are followed, however, technology development efforts including costs and schedules must be changed accordingly. Technical issues addressed in the HWMTP and HWMP are those which relate to disposal of single-shell tank wastes, contaminated soil sites, solid waste burial sites, double-shell tank wastes, encapsulated 137 CsCl and 90 SrF 2 , stored and new solid transuranic (TRU) wastes, and miscellaneous wastes such as contaminated sodium metal. Among the high priority issues to be resolved are characterization of various wastes including early determination of the TRU content of future cladding removal wastes; completion of development of vitrification (Hanford Waste Vitrification Plant) and grout technology; control of subsidence in buried waste sites; and development of criteria and standards including performance assessments of systems proposed for disposal of HSDW. Estimates of the technology costs shown in this report are made on the basis that all identified tasks for all issues associated with the reference disposal plan must be performed. Elimination of, consolidation of, or reduction in the scope of individual tasks will, of course, be reflected in corresponding reduction of overall technology costs

  2. Remedial Investigation/Feasibility Study (RI/FS) process, elements and techniques guidance

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    This manual provides detailed guidance on Remedial Investigation/Feasibility Studies (RI/FSs) conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) at Department of Energy (DOE) facilities. The purpose of the RI/FS, to assess the risk posed by a hazardous waste site and to determine the best way to reduce that risk, and its structure (site characterization, risk assessment, screening and detailed analysis of alternatives, etc.) is defined in the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) and further explained in the Environmental Protection Agency`s (EPA`s) Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA (Interim Final) 540/G-89/004, OSWER Directive 9355.3-01, October 1988. Though issued in 1988, the EPA guidance remains an excellent source of information on the conduct and structure of an RI/FS. This document makes use of supplemental RI/FS-related guidance that EPA has developed since its initial document was issued in 1988, incorporates practical lessons learned in more than 12 years of experience in CERCLA hazardous site remediation, and drawing on those lessons, introduces the Streamlined Approach For Environmental Restoration (SAFER), developed by DOE as a way to proceed quickly and efficiently through the RI/FS process at DOE facilities. Thus as its title implies, this guidance is intended to describe in detail the process and component elements of an RI/FS, as well as techniques to manage the RI/FS effectively.

  3. Interim Feed The Future Population Based Assessment of Cambodia

    Data.gov (United States)

    US Agency for International Development — This is the interim population based survey of Feed the Future in Cambodia for 2015. The data is split into survey modules. Modules A through C includes location...

  4. Fire Hazards Analysis for the 200 Area Interim Storage Area

    International Nuclear Information System (INIS)

    JOHNSON, D.M.

    2000-01-01

    This documents the Fire Hazards Analysis (FHA) for the 200 Area Interim Storage Area. The Interim Storage Cask, Rad-Vault, and NAC-1 Cask are analyzed for fire hazards and the 200 Area Interim Storage Area is assessed according to HNF-PRO-350 and the objectives of DOE Order 5480 7A. This FHA addresses the potential fire hazards associated with the Interim Storage Area (ISA) facility in accordance with the requirements of DOE Order 5480 7A. It is intended to assess the risk from fire to ensure there are no undue fire hazards to site personnel and the public and to ensure property damage potential from fire is within acceptable limits. This FHA will be in the form of a graded approach commensurate with the complexity of the structure or area and the associated fire hazards

  5. Computerization of material test data reporting system : interim report.

    Science.gov (United States)

    1973-09-01

    This study was initiated to provide an integrated system of reporting, storing, and retrieving of construction and material test data using computerized (storage-retrieval) and quality control techniques. The findings reported in this interim report ...

  6. 14 CFR 136.41 - Interim operating authority.

    Science.gov (United States)

    2010-01-01

    ... tribal lands. (2) ATMP limitation. The Administrator may grant interim operating authority under this paragraph (c) only if the ATMP for the park or tribal lands to which the application relates has not been...

  7. TANK FARM INTERIM SURFACE BARRIER MATERIALS AND RUNOFF ALTERNATIVES STUDY

    Energy Technology Data Exchange (ETDEWEB)

    HOLM MJ

    2009-06-25

    This report identifies candidate materials and concepts for interim surface barriers in the single-shell tank farms. An analysis of these materials for application to the TY tank farm is also provided.

  8. Interim research assessment 2003-2005 - Computer Science

    NARCIS (Netherlands)

    Mouthaan, A.J.; Hartel, Pieter H.

    This report primarily serves as a source of information for the 2007 Interim Research Assessment Committee for Computer Science at the three technical universities in the Netherlands. The report also provides information for others interested in our research activities.

  9. Tank Farm Interim Surface Barrier Materials And Runoff Alternatives Study

    International Nuclear Information System (INIS)

    Holm, M.J.

    2009-01-01

    This report identifies candidate materials and concepts for interim surface barriers in the single-shell tank farms. An analysis of these materials for application to the TY tank farm is also provided.

  10. CDM Convective Forecast Planning guidance

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The CDM Convective Forecast Planning (CCFP) guidance product provides a foreast of en-route aviation convective hazards. The forecasts are updated every 2 hours and...

  11. Chesapeake Bay Program Grant Guidance

    Science.gov (United States)

    Grant Guidance and appendices for the Chesapeake Bay Program that describes how the U.S. Environmental Protection Agency’s (EPA) Region 3’s Chesapeake Bay Program Office (CBPO) administers grant and cooperative agreement funds.

  12. SPLC Sustainable Purchasing Guidance Profile

    Science.gov (United States)

    To help you find the resource that is right for your organization, EPA conducted a scan of the landscape and developed summary profiles of some of the leading sources of sustainable purchasing guidance around the globe.

  13. Guidance at the educational marketplace

    DEFF Research Database (Denmark)

    Lystbæk, Christian Tang

    in educational policies and institutions. As educational systems have expanded and, further, have been restructured with the expansion of choice opportunities since the 1980s, guidance has become prioritized as a form of counseling or coaching, which can support students. Thus, guidance has become an important...... institution of power in terms of choice opportunities and ´self-develoåment practices” in educational systems, the paper will discuss how the relationship between guidance and consumerism can be conceptualized in order to evaluate (and critically discuss) the consequences of the expansion of consumerism...... `agent´ on the educational "market´, assisting (potential) students into and around the `marketplace´. Consequently, guidance is also an important `agent´ for educational institutions that increasingly use marketing strategies to promote themselves on the market to attract and hold on to their “customers...

  14. [Anterior guidance in complete dentures].

    Science.gov (United States)

    Dubreuil, J; Trevelo, A

    1990-01-01

    Although the anterior guidance in complete dentures is not really a guide, the arrangement of the anterior maxillary and mandibular prosthetic teeth, defines a propulsive line called the virtual anterior guidance, a part from the cinematic criterias. The influence of this guide on cuspal movement is superior, in all mandibular points, to the influence of the condylar pathway. If this line is not respected, the practitioner may have to do excessive grindings during occlusal adjustments.

  15. Interim Safety Basis for Fuel Supply Shutdown Facility

    Energy Technology Data Exchange (ETDEWEB)

    BENECKE, M.W.

    2000-09-07

    This ISB, in conjunction with the IOSR, provides the required basis for interim operation or restrictions on interim operations and administrative controls for the facility until a SAR is prepared in accordance with the new requirements or the facility is shut down. It is concluded that the risks associated with tha current and anticipated mode of the facility, uranium disposition, clean up, and transition activities required for permanent closure, are within risk guidelines.

  16. Interim Report by Asia International Grid Connection Study Group

    Science.gov (United States)

    Omatsu, Ryo

    2018-01-01

    The Asia International Grid Connection Study Group Interim Report examines the feasibility of developing an international grid connection in Japan. The Group has investigated different cases of grid connections in Europe and conducted research on electricity markets in Northeast Asia, and identifies the barriers and challenges for developing an international grid network including Japan. This presentation introduces basic contents of the interim report by the Study Group.

  17. Interim Safety Basis for Fuel Supply Shutdown Facility

    International Nuclear Information System (INIS)

    BENECKE, M.W.

    2000-01-01

    This ISB, in conjunction with the IOSR, provides the required basis for interim operation or restrictions on interim operations and administrative controls for the facility until a SAR is prepared in accordance with the new requirements or the facility is shut down. It is concluded that the risks associated with tha current and anticipated mode of the facility, uranium disposition, clean up, and transition activities required for permanent closure, are within risk guidelines

  18. ITER interim design report package and relevant documents

    International Nuclear Information System (INIS)

    1996-01-01

    This publication documents the technical basis which underlay the Interim Design Report, Cost Review and Safety Analysis submitted to the ITER Councils (IC-8 and IC-9) Records of decisions and the ''ITER Interim Design Report Package''. This publication contains ITER Site Requirements and ITER Site Design Assumptions, TAC-8 Report, SRG Report, CP's Report on Tentative Sequence of Events and Parties' Views on the IDR Package and Parties' Technical Comments on the IDR Package. Figs, tabs

  19. K basins interim remedial action health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  20. The information content of SFAS No 131 interim segment reporting

    OpenAIRE

    Joong-Seok Cho

    2010-01-01

    This study empirically investigates the effect of implementation of SFAS No.131 on companies' information environments by assessing the effect of interim period financial reports. Especially, using Beaver's information content measures, it investigates the market's reaction to interim period financial reporting under SFAS No.131. The empirical results of the information content test show that the adoption of SFAS No.131 does not affect the market's reaction. For the volume reaction test, no d...

  1. RCRA corrective action program guide (Interim)

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The US Department of Energy (DOE) is responsible for compliance with an increasingly complex spectrum of environmental regulations. One of the most complex programs is the corrective action program proposed by the US Environmental Protection Agency (EPA) under the authority of the Resource Conservation and Recovery Act (RCRA) as amended by the Hazardous and Solid Waste Amendments (HSWA). The proposed regulations were published on July 27, 1990. The proposed Subpart S rule creates a comprehensive program for investigating and remediating releases of hazardous wastes and hazardous waste constituents from solid waste management units (SWMUs) at facilities permitted to treat, store, or dispose of hazardous wastes. This proposed rule directly impacts many DOE facilities which conduct such activities. This guidance document explains the entire RCRA Corrective Action process as outlined by the proposed Subpart S rule, and provides guidance intended to assist those persons responsible for implementing RCRA Corrective Action at DOE facilities.

  2. Information management architecture for an integrated computing environment for the Environmental Restoration Program. Environmental Restoration Program, Volume 3, Interim technical architecture

    International Nuclear Information System (INIS)

    1994-09-01

    This third volume of the Information Management Architecture for an Integrated Computing Environment for the Environmental Restoration Program--the Interim Technical Architecture (TA) (referred to throughout the remainder of this document as the ER TA)--represents a key milestone in establishing a coordinated information management environment in which information initiatives can be pursued with the confidence that redundancy and inconsistencies will be held to a minimum. This architecture is intended to be used as a reference by anyone whose responsibilities include the acquisition or development of information technology for use by the ER Program. The interim ER TA provides technical guidance at three levels. At the highest level, the technical architecture provides an overall computing philosophy or direction. At this level, the guidance does not address specific technologies or products but addresses more general concepts, such as the use of open systems, modular architectures, graphical user interfaces, and architecture-based development. At the next level, the technical architecture provides specific information technology recommendations regarding a wide variety of specific technologies. These technologies include computing hardware, operating systems, communications software, database management software, application development software, and personal productivity software, among others. These recommendations range from the adoption of specific industry or Martin Marietta Energy Systems, Inc. (Energy Systems) standards to the specification of individual products. At the third level, the architecture provides guidance regarding implementation strategies for the recommended technologies that can be applied to individual projects and to the ER Program as a whole

  3. Information management architecture for an integrated computing environment for the Environmental Restoration Program. Environmental Restoration Program, Volume 3, Interim technical architecture

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This third volume of the Information Management Architecture for an Integrated Computing Environment for the Environmental Restoration Program--the Interim Technical Architecture (TA) (referred to throughout the remainder of this document as the ER TA)--represents a key milestone in establishing a coordinated information management environment in which information initiatives can be pursued with the confidence that redundancy and inconsistencies will be held to a minimum. This architecture is intended to be used as a reference by anyone whose responsibilities include the acquisition or development of information technology for use by the ER Program. The interim ER TA provides technical guidance at three levels. At the highest level, the technical architecture provides an overall computing philosophy or direction. At this level, the guidance does not address specific technologies or products but addresses more general concepts, such as the use of open systems, modular architectures, graphical user interfaces, and architecture-based development. At the next level, the technical architecture provides specific information technology recommendations regarding a wide variety of specific technologies. These technologies include computing hardware, operating systems, communications software, database management software, application development software, and personal productivity software, among others. These recommendations range from the adoption of specific industry or Martin Marietta Energy Systems, Inc. (Energy Systems) standards to the specification of individual products. At the third level, the architecture provides guidance regarding implementation strategies for the recommended technologies that can be applied to individual projects and to the ER Program as a whole.

  4. Quality in career guidance: The Danish case

    DEFF Research Database (Denmark)

    Plant, Peter

    2011-01-01

    Quality assurance systems are introduced in career guidance to monitor, control and develop guidance interventions. The Danish case represents at centrally driven, top-down approach......Quality assurance systems are introduced in career guidance to monitor, control and develop guidance interventions. The Danish case represents at centrally driven, top-down approach...

  5. Guidance for External Events Analysis

    International Nuclear Information System (INIS)

    This Guidance for External Events Analysis was developed under a contract with the Nordic PSA Group, and aims at creating a common framework for analysis of external events as part of a nuclear power plant Probabilistic Safety Assessment. Thus, the purpose of this Guidance is to constitute a common methodological guidance for the analysis of external events at Nordic nuclear power plants. This will make it possible for the utilities to perform these analyses in a cost-efficient way, assuring simultaneously the quality of the analyses. The Guidance is meant to clarify the scope of the analysis of external events, to provide guidance for the performance of the analysis, and to help in defining, subcontracting and reviewing the work. The analysis procedure includes four phases, addressing project planning, identification of external events, screening of events, and probabilistic analysis. The aim is first to do as complete an identification of potential single and combined external events as possible. Thereafter, as many external events as possible are screened out as early as possible. The screening capability is increased during the project, using the continuously acquired information on the events and on their effects on the plant

  6. The EMEFS model evaluation. An interim report

    Energy Technology Data Exchange (ETDEWEB)

    Barchet, W.R. [Pacific Northwest Lab., Richland, WA (United States); Dennis, R.L. [Environmental Protection Agency, Research Triangle Park, NC (United States); Seilkop, S.K. [Analytical Sciences, Inc., Durham, NC (United States); Banic, C.M.; Davies, D.; Hoff, R.M.; Macdonald, A.M.; Mickle, R.E.; Padro, J.; Puckett, K. [Atmospheric Environment Service, Downsview, ON (Canada); Byun, D.; McHenry, J.N. [Computer Sciences Corp., Research Triangle Park, NC (United States); Karamchandani, P.; Venkatram, A. [ENSR Consulting and Engineering, Camarillo, CA (United States); Fung, C.; Misra, P.K. [Ontario Ministry of the Environment, Toronto, ON (Canada); Hansen, D.A. [Electric Power Research Inst., Palo Alto, CA (United States); Chang, J.S. [State Univ. of New York, Albany, NY (United States). Atmospheric Sciences Research Center

    1991-12-01

    The binational Eulerian Model Evaluation Field Study (EMEFS) consisted of several coordinated data gathering and model evaluation activities. In the EMEFS, data were collected by five air and precipitation monitoring networks between June 1988 and June 1990. Model evaluation is continuing. This interim report summarizes the progress made in the evaluation of the Regional Acid Deposition Model (RADM) and the Acid Deposition and Oxidant Model (ADOM) through the December 1990 completion of a State of Science and Technology report on model evaluation for the National Acid Precipitation Assessment Program (NAPAP). Because various assessment applications of RADM had to be evaluated for NAPAP, the report emphasizes the RADM component of the evaluation. A protocol for the evaluation was developed by the model evaluation team and defined the observed and predicted values to be used and the methods by which the observed and predicted values were to be compared. Scatter plots and time series of predicted and observed values were used to present the comparisons graphically. Difference statistics and correlations were used to quantify model performance. 64 refs., 34 figs., 6 tabs.

  7. Revised guidance of the principles for establishing intervention levels for the protection of the public in the event of a nuclear accident or radiological emergency

    International Nuclear Information System (INIS)

    1988-07-01

    An IAEA Advisory Group met in February 1987 to: i) review existing Agency guidance on intervention levels of dose and whether, and if so, what, revision is required; ii) consider whether, and if so, what additional guidance is required on limiting the stochastic risk and collective dose equivalent, and; iii) consider whether, and if so, what, additional guidance should be developed on derived intervention levels. The purpose of this Interim Report is to present to a broader audience the initial conclusions and recommendations of the Advisory Group in order that they may be used in conjunction with the guidance currently presented in Safety Series No. 72, pending publication of the revised Safety Series, scheduled for late 1989. 14 refs

  8. Information architecture. Volume 3: Guidance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-04-01

    The purpose of this document, as presented in Volume 1, The Foundations, is to assist the Department of Energy (DOE) in developing and promulgating information architecture guidance. This guidance is aimed at increasing the development of information architecture as a Departmentwide management best practice. This document describes departmental information architecture principles and minimum design characteristics for systems and infrastructures within the DOE Information Architecture Conceptual Model, and establishes a Departmentwide standards-based architecture program. The publication of this document fulfills the commitment to address guiding principles, promote standard architectural practices, and provide technical guidance. This document guides the transition from the baseline or defacto Departmental architecture through approved information management program plans and budgets to the future vision architecture. This document also represents another major step toward establishing a well-organized, logical foundation for the DOE information architecture.

  9. Agent Based Individual Traffic guidance

    DEFF Research Database (Denmark)

    Wanscher, Jørgen Bundgaard

    2004-01-01

    can be obtained through cellular phone tracking or GPS systems. This information can then be used to provide individual traffic guidance as opposed to the mass information systems of today -- dynamic roadsigns and trafficradio. The goal is to achieve better usage of road and time. The main topic......When working with traffic planning or guidance it is common practice to view the vehicles as a combined mass. >From this models are employed to specify the vehicle supply and demand for each region. As the models are complex and the calculations are equally demanding the regions and the detail...

  10. Sequential interim analyses of survival data in DNA microarray experiments

    Directory of Open Access Journals (Sweden)

    Jung Klaus

    2011-04-01

    Full Text Available Abstract Background Discovery of biomarkers that are correlated with therapy response and thus with survival is an important goal of medical research on severe diseases, e.g. cancer. Frequently, microarray studies are performed to identify genes of which the expression levels in pretherapeutic tissue samples are correlated to survival times of patients. Typically, such a study can take several years until the full planned sample size is available. Therefore, interim analyses are desirable, offering the possibility of stopping the study earlier, or of performing additional laboratory experiments to validate the role of the detected genes. While many methods correcting the multiple testing bias introduced by interim analyses have been proposed for studies of one single feature, there are still open questions about interim analyses of multiple features, particularly of high-dimensional microarray data, where the number of features clearly exceeds the number of samples. Therefore, we examine false discovery rates and power rates in microarray experiments performed during interim analyses of survival studies. In addition, the early stopping based on interim results of such studies is evaluated. As stop criterion we employ the achieved average power rate, i.e. the proportion of detected true positives, for which a new estimator is derived and compared to existing estimators. Results In a simulation study, pre-specified levels of the false discovery rate are maintained in each interim analysis, where reduced levels as used in classical group sequential designs of one single feature are not necessary. Average power rates increase with each interim analysis, and many studies can be stopped prior to their planned end when a certain pre-specified power rate is achieved. The new estimator for the power rate slightly deviates from the true power rate but is comparable to other estimators. Conclusions Interim analyses of microarray experiments can provide

  11. Permitting plan for the high-level waste interim storage

    Energy Technology Data Exchange (ETDEWEB)

    Deffenbaugh, M.L.

    1997-04-23

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist.

  12. Permitting plan for the high-level waste interim storage

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1997-01-01

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist

  13. Interim Policy on Stack Height Regulatory Actions

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  14. Wind energy and aviation interests - interim guidelines

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    The impact on aviation of increasing the number of wind farms in the United Kingdom is discussed by the Wind Energy, Defence and Civil Aviation Interests Working Group, comprising the Department of Trade and Industry, the Civil Aviation Authority, the Ministry of Defence, and the British Wind Energy Association. The report offers guidance to wind farm developers, local authorities and statutory consultees within the aviation community: the main thrust of the guidelines is to support the UK Government's wind energy targets. Although the document does not contain in-depth technical discussions, it does provide references to such information.

  15. DOE Waste Treatability Group Guidance

    International Nuclear Information System (INIS)

    Kirkpatrick, T.D.

    1995-01-01

    This guidance presents a method and definitions for aggregating U.S. Department of Energy (DOE) waste into streams and treatability groups based on characteristic parameters that influence waste management technology needs. Adaptable to all DOE waste types (i.e., radioactive waste, hazardous waste, mixed waste, sanitary waste), the guidance establishes categories and definitions that reflect variations within the radiological, matrix (e.g., bulk physical/chemical form), and regulated contaminant characteristics of DOE waste. Beginning at the waste container level, the guidance presents a logical approach to implementing the characteristic parameter categories as part of the basis for defining waste streams and as the sole basis for assigning streams to treatability groups. Implementation of this guidance at each DOE site will facilitate the development of technically defined, site-specific waste stream data sets to support waste management planning and reporting activities. Consistent implementation at all of the sites will enable aggregation of the site-specific waste stream data sets into comparable national data sets to support these activities at a DOE complex-wide level

  16. Training on automated machine guidance.

    Science.gov (United States)

    2009-05-01

    "Beginning in 2006, WisDOT and the Construction Materials Support Center (CMSC) at UW-Madison worked together : to develop the specifications and the QA/QC procedures for GPS machine guidance on highway grading projects. These : specifications and pr...

  17. DOE Waste Treatability Group Guidance

    Energy Technology Data Exchange (ETDEWEB)

    Kirkpatrick, T.D.

    1995-01-01

    This guidance presents a method and definitions for aggregating U.S. Department of Energy (DOE) waste into streams and treatability groups based on characteristic parameters that influence waste management technology needs. Adaptable to all DOE waste types (i.e., radioactive waste, hazardous waste, mixed waste, sanitary waste), the guidance establishes categories and definitions that reflect variations within the radiological, matrix (e.g., bulk physical/chemical form), and regulated contaminant characteristics of DOE waste. Beginning at the waste container level, the guidance presents a logical approach to implementing the characteristic parameter categories as part of the basis for defining waste streams and as the sole basis for assigning streams to treatability groups. Implementation of this guidance at each DOE site will facilitate the development of technically defined, site-specific waste stream data sets to support waste management planning and reporting activities. Consistent implementation at all of the sites will enable aggregation of the site-specific waste stream data sets into comparable national data sets to support these activities at a DOE complex-wide level.

  18. Consensus standard requirements and guidance

    International Nuclear Information System (INIS)

    Putman, V.L.

    1995-01-01

    This report presents information from the ANS Criticality Alarm System Workshop relating to the consensus standard requirements and guidance. Topics presented include: definition; nomenclature; requirements and recommendations; purpose of criticality alarms; design criteria; signal characteristics; reliability, dependability and durability; tests; and emergency preparedness and planning

  19. Interstitial guidance of cancer invasion.

    NARCIS (Netherlands)

    Gritsenko, P.G.; Ilina, O.; Friedl, P.H.

    2012-01-01

    Cancer cell invasion into healthy tissues develops preferentially along pre-existing tracks of least resistance, followed by secondary tissue remodelling and destruction. The tissue scaffolds supporting or preventing guidance of invasion vary in structure and molecular composition between organs. In

  20. Widening opportunities for career guidance

    DEFF Research Database (Denmark)

    Poulsen, Bo Klindt; Skovhus, Randi Boelskifte; Thomsen, Rie

    2018-01-01

    This chapter discusses research circles as a way of organising collaboration between career guidance researchers and practitioners. Such collaboration, it is argued, helps resist neoliberal governance mechanisms and supports social justice perspectives among teachers involved in the provision....... The analyses show that the support provided within research circles also serve to disrupt the neoliberal discourse of a functionalist view on career learning activities....

  1. Widening opportunities for career guidance

    DEFF Research Database (Denmark)

    Poulsen, Bo Klindt; Skovhus, Randi Boelskifte; Thomsen, Rie

    2017-01-01

    This chapter discusses research circles as a way of organising collaboration between career guidance researchers and practitioners. Such collaboration, it is argued, helps resist neoliberal governance mechanisms and supports social justice perspectives among teachers involved in the provision....... The analyses show that the support provided within research circles also serve to disrupt the neoliberal discourse of a functionalist view on career learning activities....

  2. 78 FR 20503 - Energy Conservation Program: Availability of the Interim Technical Support Document for High...

    Science.gov (United States)

    2013-04-05

    ... CFR Part 431 RIN 1904-AC36 Energy Conservation Program: Availability of the Interim Technical Support... interim technical support document (TSD) for high-intensity discharge (HID) lamps energy conservation....aspx/ruleid/23 . This Web page contains links to the interim technical support document and other...

  3. Single-shell tank interim stabilization project plan

    International Nuclear Information System (INIS)

    Ross, W.E.

    1998-01-01

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE's Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  4. Interim process report for the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Sellin, Patrick (ed.)

    2004-08-01

    This report is a documentation of buffer processes identified as relevant to the long-term safety of a KBS-3 repository. The report is part of the interim reporting of the safety assessment SR-Can, see further the Interim main report. The final SR-Can reporting will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of this report is to document the scientific knowledge of the processes to a level required for an adequate treatment in the safety assessment. The documentation is thus from a scientific point of not exhaustive since such a treatment is neither necessary for the purposes of the safety assessment nor possible within the scope of an assessment. The purpose is further to determine the handling of each process in the safety assessment and to demonstrate how uncertainties are taken care of, given the suggested handling. The process documentation in the SR 97 version of the Process report is a starting point for this SR-Can interim version. As further described in the Interim main report, the list of relevant processes has been reviewed and slightly extended by comparison to other databases. Furthermore, the backfill has been included as a system part of its own, rather than being described together with the buffer as in SR 97. Apart from giving an interim account of the documentation and handling of buffer processes in SR-Can, this report is meant to serve as a template for the forthcoming documentation of processes occurring in other parts of the repository system. A complete list of processes can be found in the Interim FEP report for the safety assessment SR-Can. All material presented in this document is preliminary in nature and will possibly be updated as the SR-Can project progresses.

  5. A review of proposed Glen Canyon Dam interim operating criteria

    Energy Technology Data Exchange (ETDEWEB)

    LaGory, K.; Hlohowskyj, I.; Tomasko, D.; Hayse, J.; Durham, L.

    1992-04-01

    Three sets of interim operating criteria for Glen Canyon Dam on the Colorado River have been proposed for the period of November 1991, to the completion of the record of decision for the Glen Canyon Dam environmental impact statement (about 1993). These criteria set specific limits on dam releases, including maximum and minimum flows, up-ramp and down-ramp rates, and maximum daily fluctuation. Under the proposed interim criteria, all of these parameters would be reduced relative to historical operating criteria to protect downstream natural resources, including sediment deposits, threatened and endangered fishes, trout, the aquatic food base, and riparian plant communities. The scientific bases of the three sets of proposed operating criteria are evaluated in the present report:(1) criteria proposed by the Research/Scientific Group, associated with the Glen Canyon Environmental Studies (GCES); (2) criteria proposed state and federal officials charged with managing downstream resources; and (3) test criteria imposed from July 1991, to November 1991. Data from Phase 1 of the GCES and other sources established that the targeted natural resources are affected by dam operations, but the specific interim criteria chosen were not supported by any existing studies. It is unlikely that irreversible changes to any of the resources would occur over the interim period if historical operating criteria remained in place. It is likely that adoption of any of the sets of proposed interim operating criteria would reduce the levels of sediment transport and erosion below Glen Canyon Dam; however, these interim criteria could result in some adverse effects, including the accumulation of debris at tributary mouths, a shift of new high-water-zone vegetation into more flood-prone areas, and further declines in vegetation in the old high water zone.

  6. Interim process report for the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Sellin, Patrick

    2004-08-01

    This report is a documentation of buffer processes identified as relevant to the long-term safety of a KBS-3 repository. The report is part of the interim reporting of the safety assessment SR-Can, see further the Interim main report. The final SR-Can reporting will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of this report is to document the scientific knowledge of the processes to a level required for an adequate treatment in the safety assessment. The documentation is thus from a scientific point of not exhaustive since such a treatment is neither necessary for the purposes of the safety assessment nor possible within the scope of an assessment. The purpose is further to determine the handling of each process in the safety assessment and to demonstrate how uncertainties are taken care of, given the suggested handling. The process documentation in the SR 97 version of the Process report is a starting point for this SR-Can interim version. As further described in the Interim main report, the list of relevant processes has been reviewed and slightly extended by comparison to other databases. Furthermore, the backfill has been included as a system part of its own, rather than being described together with the buffer as in SR 97. Apart from giving an interim account of the documentation and handling of buffer processes in SR-Can, this report is meant to serve as a template for the forthcoming documentation of processes occurring in other parts of the repository system. A complete list of processes can be found in the Interim FEP report for the safety assessment SR-Can. All material presented in this document is preliminary in nature and will possibly be updated as the SR-Can project progresses

  7. An interim report on the State of Nevada socioeconomic studies

    International Nuclear Information System (INIS)

    1989-06-01

    This Interim Report is a report on work in progress and presents findings from the research to date on the potential consequences of a repository for the citizens of Nevada. The research and findings in the Report have been subjected to rigorous peer review as part of the state's effort to insure independent, objective analysis that meets the highest professional standards. The basic research effort will continue through June 1990 and will enable the state to refine and clarify the findings presented in this Interim Report

  8. Interim safety basis for fuel supply shutdown facility

    International Nuclear Information System (INIS)

    Brehm, J.R.; Deobald, T.L.; Benecke, M.W.; Remaize, J.A.

    1995-01-01

    This ISB in conjunction with the new TSRs, will provide the required basis for interim operation or restrictions on interim operations and administrative controls for the Facility until a SAR is prepared in accordance with the new requirements. It is concluded that the risk associated with the current operational mode of the Facility, uranium closure, clean up, and transition activities required for permanent closure, are within Risk Acceptance Guidelines. The Facility is classified as a Moderate Hazard Facility because of the potential for an unmitigated fire associated with the uranium storage buildings

  9. Single-shell tank interim stabilization risk analysis

    International Nuclear Information System (INIS)

    Basche, A.D.

    1998-01-01

    The purpose of the Single-Shell Tank (SST) Interim Stabilization Risk Analysis is to provide a cost and schedule risk analysis of HNF-2358, Rev. 1, Single-Shell Tank Interim Stabilization Project Plan (Project Plan) (Ross et al. 1998). The analysis compares the required cost profile by fiscal year (Section 4.2) and revised schedule completion date (Section 4.5) to the Project Plan. The analysis also evaluates the executability of the Project Plan and recommends a path forward for risk mitigation

  10. Review of SKB's interim report of SR-Can: SKI's and SSI's evaluation of SKB's up-dated methodology for safety assessment

    International Nuclear Information System (INIS)

    Dverstorp, Bjoern; Moberg, Leif; Wiebert, Anders; Xu Shulan; Stroemberg, Bo; Kautsky, Fritz; Lilja, Christina; Simic, Eva; Sundstroem, Benny; Toverud, Oeivind

    2005-07-01

    This report presents the findings of a review of the Swedish Nuclear Fuel and Waste Management Co.'s (SKB) interim report of the safety assessment SR-Can (SKB TR 04-11), conducted by the Swedish Radiation Protection Authority (SSI) and the Swedish Nuclear Power Inspectorate (SKI). SKB's interim report describes and exemplifies the safety assessment methodology that SKB plans to use in the oncoming licence applications for an encapsulation plant and a final repository for spent nuclear fuel. The authorities' review takes into account the findings of an international peer review of SKB's interim report. The authorities conclude that SKB has improved its safety assessment methodology in several aspects compared to earlier safety reports. Among other things the authorities commend SKB for giving a comprehensive account of relevant regulations and guidance, and for the systematic approach to identification and documentation of features, events and processes that need to be considered in the safety assessment. However, the authorities also conclude that important parts of SKB's method need to be further developed before they are mature enough to be used as a basis for a license application. The authorities' overall assessment is summarised in chapter 8 of this report

  11. Maladjusted Children and the Child Guidance Service

    Science.gov (United States)

    Tizard, Jack

    1973-01-01

    Argues that the child guidance clinic, linchpin of the child guidance service, is an expensive, ineffective, and wrongly conceived institution. Does not discuss the needs of preschoolers, services by special classes, nor special schools for maladjusted pupils. (RJ)

  12. Review of soil contamination guidance

    International Nuclear Information System (INIS)

    Mueller, M.A.; Kennedy, W.E. Jr.; Soldat, J.K.

    1981-08-01

    A review of existing and proposed radioactive soil contamination standards and guidance was conducted for United Nuclear Corporation (UNC), Office of Surplus Facilities Management. Information was obtained from both government agencies and other sources during a literature survey. The more applicable standards were reviewed, evaluated, and summarized. Information pertaining to soil contamination for both facility operation and facility decommissioning was obtained from a variety of sources. These sources included: the Code of Federal Regulations, regulatory guides, the Federal Register, topical reports written by various government agencies, topical reports written by national laboratories, and publications from the American National Standards Institute (ANSI). It was difficult to directly compare the standards and guidance obtained from these sources since each was intended for a specific situation and different units or bases were used. However, most of the information reviewed was consistent with the philosophy of maintaining exposures at levels as low as reasonably achievable

  13. Career Guidance in Five English Independent Schools

    Science.gov (United States)

    Hutchinson, Jo

    2018-01-01

    English independent schools are not required to follow government statutory guidance in a number of aspects including career education and guidance, and yet many are actively engaged in careers work and this has caught the attention of policymakers. State schools are subject to statutory guidance but, according to Ofsted and other authorities, the…

  14. Vocational guidance in social volunteering

    Directory of Open Access Journals (Sweden)

    Nikolay S. Pryazhnikov

    2017-03-01

    Full Text Available The paper discusses the possibilities and limitations of vocational guidance in the social volunteering system. The essence of volunteer work is closely related with assistance to desperate people in searching for the meaning of living, often coinciding with labour activity that are deemed in terms of “the main matter of life” and “the leading activity”. For adolescents, it is the choice of career, and for adults, it is the work proper (i.e. an essential condition for personal self-realization. The problem of “forced volunteering” for experts in vocational guidance also means that they often have to work voluntarily and unselfishly outside the official guidelines. To clarify the terms «volunteer» and «a person in desperate need of help» the study used the method of analyzing the documents, e.g. the Regulations on Social Volunteering, the generalization of psychological sources, the initial survey of university students as active supporters of the volunteer movement, On the essence of volunteering and the place of career guidance in selfless social work. Vocational guidance is not excluded from the general system of volunteerism, but has an insufficiently defined status and low popularity among participants in social volunteering. Also, the problem of «forced volunteering» of experts in career counseling, which often requires voluntary and unselfish performance of quality work outside the framework of official instructions, is also indicated. Simultaneously, positive aspects of such disinterested career initiatives are noted, in particular, less control by the official inspectors (or customers and, accordingly, greater freedom of creativity than when someone else does the work.

  15. Individual plant examination: Submittal guidance

    International Nuclear Information System (INIS)

    1989-08-01

    Based on a Policy Statement on Severe Accidents Regarding Future Designs and Existing Plants, the performance of a plant examination is requested from the licensee of each nuclear power plant. The plant examination looks for vulnerabilities to severe accidents and cost-effective safety improvements that reduce or eliminate the important vulnerabilities. This document delineates guidance for reporting the results of that plant examination. 38 refs., 2 tabs

  16. 2011 Army Strategic Planning Guidance

    Science.gov (United States)

    2011-03-25

    TESI ) of 22,000 Soldiers, the Army’s total force by the end of the mid-term period is programmed to be 520K (AC). We will achieve a more...dwell ratios, extending TESI authority to adequately man deploying units and sustain the All-Volunteer Force, right-sizing the generating force, and... TESI Temporary End-Strength Increase WMD Weapons of Mass Destruction 2011 ARMY STRATEGIC PLANNING GUIDANCE Page 19 2011

  17. Radionuclide Data Quality Evaluation Guidance

    International Nuclear Information System (INIS)

    Tucker, B.J.; Winters, M.S.; Evans, D.

    2009-01-01

    A considerable amount of radioanalytical data is generated during various phases of the characterization and remediation of radiologically-contaminated sites and properties. It is critical that data generated from the analysis of collected samples be to a level of quality usable by the project and acceptable to stakeholders. In July 2004, the final version of a multi-agency guidance manual entitled Multi-Agency Radiological Analytical Protocols Manual (MARLAP) was issued by the Environmental Protection Agency, Department of Energy, Department of Homeland Security, Nuclear Regulatory Commission, Department of Defense, National Institute of Standards and Technology, U. S. Geological Survey, Food and Drug Administration, and the States of Kentucky and California. The authors' purpose is to introduce readers to some key elements of MARLAP as it relates to radioanalytical lab quality control, and to demonstrate how these guidance elements can be effectively incorporated into mature radioanalytical lab operations and data validation regimes. Based upon the logic and statistical methodologies presented in MARLAP, the authors have revised existing project-specific Radioanalytical Data Evaluation Guidance (RadDEG) used at the FUSRAP Maywood Site in Maywood, NJ. The RadDEG allows users to qualify data in a meaningful way by tying the usability of the data to its activity and uncertainty relative to project action levels and QC results. This exercise may be useful to other projects looking to implement a MARLAP-based approach into their project/site-specific data evaluation methodologies. (authors)

  18. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-05-11

    This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  19. Rosiglitazone evaluated for cardiovascular outcomes--an interim analysis

    DEFF Research Database (Denmark)

    Home, Philip D; Pocock, Stuart J; Beck-Nielsen, Henning

    2007-01-01

    group). The primary end point was hospitalization or death from cardiovascular causes. RESULTS: Because the mean follow-up was only 3.75 years, our interim analysis had limited statistical power to detect treatment differences. A total of 217 patients in the rosiglitazone group and 202 patients...

  20. The Forward Testing Effect: Interim Testing Enhances Inductive Learning

    Science.gov (United States)

    Yang, Chunliang; Shanks, David R.

    2018-01-01

    "Induction" refers to the process in which people generalize their previous experience when making uncertain inferences about the environment that go beyond direct experience. Here we show that interim tests strongly enhance inductive learning. Participants studied the painting styles of eight famous artists across four lists, each…

  1. 46 CFR 308.303 - Amounts insured under interim binder.

    Science.gov (United States)

    2010-10-01

    ... 308.303 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.303 Amounts insured under interim binder. The amounts insured are the amounts specified in the Second Seamen's War Risk Policy (1955) or as modified by shipping...

  2. Options for the interim storage of spent fuel

    International Nuclear Information System (INIS)

    Kromar, M.; Kurincic, B.

    1995-01-01

    Different concepts for the interim storage of spent fuel arising from operation of a NPP are discussed. We considered at reactor as well as away from reactor storage options. Included are enhancements of existing storage capabilities and construction of a new wet or dry storage facility. (author)

  3. New York State interim waste management cost evaluation

    International Nuclear Information System (INIS)

    Ma, M.S.; Watts, R.J.; Jorgensen, J.R.; Rochester Gas and Electric Corp., NY)

    1985-01-01

    The purpose of this study is to investigate and quantify the comparative costs associated with including or excluding Class A utility wastes at a centralized interim waste management facility in New York State. The objective of the study is to assess the unit costs and total statewide costs associated with two distinct scenarios: (1) the case where non-utility Class A LLRW is received, incinerated and stored at the centralized interim facility, and utility Class A wastes are held without incineration at respective nuclear power plant interim onsite facilities without incineration; and (2) the alternative case where both utility and non-utility Class A wastes are accepted, incinerated and stored at the centralized facility. Unit costs to waste generators are estimated for each of the two cases described. This is followed by an estimation of the statewide cost impact to the public. The cost impact represents the cost differential resulting from the exclusion of utility Class A waste from the centralized NYS interim waste management facility. The principal factors comprising the cost differential include (1) higher unit disposal fees charged to non-utility waste generators, which are passed along in the costs of products and services; and (2) costs to utilities due to construction of additional onsite storage capacity, which in turn are charged to electric rate payers

  4. 40 CFR 266.103 - Interim status standards for burners.

    Science.gov (United States)

    2010-07-01

    ... during interim status to industrial furnaces (e.g., kilns, cupolas) that feed hazardous waste for a..., owners and operators shall not feed hazardous waste that has a heating value less than 5,000 Btu/lb, as..., beryllium, cadmium, chromium, lead, mercury, silver, and thallium in each feed stream (hazardous waste...

  5. System Specification for Immobilized High-Level Waste Interim Storage

    International Nuclear Information System (INIS)

    CALMUS, R.B.

    2000-01-01

    This specification establishes the system-level functional, performance, design, interface, and test requirements for Phase 1 of the IHLW Interim Storage System, located at the Hanford Site in Washington State. The IHLW canisters will be produced at the Hanford Site by a Selected DOE contractor. Subsequent to storage the canisters will be shipped to a federal geologic repository

  6. 39 CFR 211.4 - Interim personnel regulations.

    Science.gov (United States)

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Interim personnel regulations. 211.4 Section 211.4... under the Postal Reorganization Act. (b) Continuation of Personnel Provisions of Former title 39, U.S.C... collective bargaining agreement under the Postal Reorganization Act, all provisions of former title 39, U.S.C...

  7. Effectiveness Monitoring Report, MWMF Tritium Phytoremediation Interim Measures.

    Energy Technology Data Exchange (ETDEWEB)

    Hitchcock, Dan; Blake, John, I.

    2003-02-10

    This report describes and presents the results of monitoring activities during irrigation operations for the calendar year 2001 of the MWMF Interim Measures Tritium Phytoremediation Project. The purpose of this effectiveness monitoring report is to provide the information on instrument performance, analysis of CY2001 measurements, and critical relationships needed to manage irrigation operations, estimate efficiency and validate the water and tritium balance model.

  8. Single Shell Tank (SST) Interim Stabilization Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    VLADIMIROFF, D.T.; BOYLES, V.C.

    2000-05-22

    This project plan establishes the management framework for the conduct of the CHG Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organization structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  9. Students' interim literacies as a dynamic resource for teaching and ...

    African Journals Online (AJOL)

    This article explores the notion of 'interim literacies'by drawing on data from a research project which used linguistic and intertextual analysis of first year student writing in economics to investigate the intersection of academic discourse and student voice. This research has provided a rich set of data to illustrate the ways in ...

  10. 17 CFR 210.10-01 - Interim financial statements.

    Science.gov (United States)

    2010-04-01

    ... flows from operating activities and showing cash changes from investing and financing activities... dividends declared per share applicable to common stock. The basis of the earnings per share computation... registrant, and where consistent with the protection of investors, permit the omission of any of the interim...

  11. Subsurface Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document, Operable Unit No. 2

    International Nuclear Information System (INIS)

    1992-01-01

    The subject Interim Measures/Interim Remedial Action plan/Environmental Assessment (IM/IRAP/EA) addresses residual free-phase volatile organic compound (VOC) contamination suspected in the subsurface within an area identified as Operable Unit No. 2 (OU2). This IM/IRAP/EA also addresses radionuclide contamination beneath the 903 Pad at OU2. Although subsurface VOC and radionuclide contamination on represent a source of OU2 ground-water contamination, they pose no immediate threat to public health or the environment. This IM/IRAP/EA identifies and evaluates interim remedial actions for removal of residual free-phase VOC contamination from three different subsurface environments at OU2. The term ''residual'' refers to the non-aqueous phase contamination remaining in the soil matrix (by capillary force) subsequent to the passage of non-aqueous or free-phase liquid through the subsurface. In addition to the proposed actions, this IM/IRAP/EA presents an assessment of the No Action Alternative. This document also considers an interim remedial action for the removal of radionuclides from beneath the 903 Pad

  12. SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

    International Nuclear Information System (INIS)

    Norton, S.H.

    2010-01-01

    CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford

  13. SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    NORTON SH

    2010-02-23

    CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford

  14. Analysing Interplanetary Probe Guidance Accuracy

    Directory of Open Access Journals (Sweden)

    S. V. Sukhova

    2016-01-01

    Full Text Available The paper presents a guidance accuracy analysis and estimates delta-v budget required to provide the trajectory correction maneuvers for direct interplanetary flights (without midcourse gravity assists. The analysis takes into consideration the orbital hyperbolic injection errors (depend on a selected launch vehicle and ascent trajectory and the uncertainties of midcourse correction maneuvers.The calculation algorithm is based on Monte Carlo simulation and Danby’s matrix methods (the matrizant of keplerian motion. Danby’s method establishes a link between the errors of the spacecraft state vectors at different flight times using the reference keplerian orbit matrizant. Utilizing the nominal trajectory parameters and the covariance matrix of launch vehicle injection errors the random perturbed orbits are generated and required velocity corrections are calculated. The next step is to simulate midcourse maneuver performance uncertainty using the midcourse maneuver covariance matrix. The obtained trajectory correction impulses and spacecraft position errors are statistically processed to compute required delta-v budget and dispersions ellipse parameters for different prediction intervals.As an example, a guidance accuracy analysis has been conducted for a 2022 mission to Mars and a Venus mission in 2026. The paper considers one and two midcourse correction options, as well as utilization of two different launch vehicles.The presented algorithm based on Monte Carlo simulation and Danby’s methods provides preliminary evaluation for midcourse corrections delta-v budget and spacecraft position error. The only data required for this guidance accuracy analysis are a reference keplerian trajectory and a covariance matrix of the injection errors. Danby’s matrix method allows us to take into account also the other factors affecting the trajectory thereby increasing the accuracy of analysis.

  15. Guidance on accidents involving radioactivity

    International Nuclear Information System (INIS)

    1989-01-01

    This annex contains advice to Health Authorities on their response to accidents involving radioactivity. The guidance is in six parts:-(1) planning the response required to nuclear accidents overseas, (2) planning the response required to UK nuclear accidents a) emergency plans for nuclear installations b) nuclear powered satellites, (3) the handling of casualties contaminated with radioactive substances, (4) background information for dealing with queries from the public in the event of an accident, (5) the national arrangements for incident involving radioactivity (NAIR), (6) administrative arrangements. (author)

  16. Widening opportunities for career guidance

    DEFF Research Database (Denmark)

    Poulsen, Bo Klindt; Skovhus, Randi Boelskifte; Thomsen, Rie

    2018-01-01

    This chapter discusses research circles as a way of organising collaboration between career guidance researchers and practitioners. Such collaboration, it is argued, helps resist neoliberal governance mechanisms and supports social justice perspectives among teachers involved in the provision...... of career education in Danish schools. Based on a research and development project on career education, case analysis is used to explore research circles as a means for collaboration between researchers and practitioners. This analysis shows that research circles provide teachers with a space to reflect....... The analyses show that the support provided within research circles also serve to disrupt the neoliberal discourse of a functionalist view on career learning activities....

  17. Quality guidance and quality formation

    DEFF Research Database (Denmark)

    Poulsen, Carsten Stig; Juhl, Hans Jørn; Kristensen, Kai

    1996-01-01

    This paper presents an extension of the quality guidance model of Steenkamp and van Trijp that includes consumer quality formation processes. Quality expectations and quality experiences are seen as antecedents of perceived overall product quality conceptual model is applied using LISREL to a data...... set on Danish butter cookies. Five plausible models of the relation between expectation, experience and perceived product quality are estimated. Finally one model is selected on the basis of three criteria: chi-square, RMSEA and AIC: The results show a model where expectations are indirectly related...... to perceived quality through experience. Udgivelsesdato: APR...

  18. Alternatives for managing wastes from reactors and post-fission operations in the LWR fuel cycle. Volume 3. Alternatives for interim storage and transportation

    International Nuclear Information System (INIS)

    1976-05-01

    Volume III of the five-volume report contains information on alternatives for interim storage and transportation. Section titles are: interim storage of spent fuel elements; interim storage of chop-leach fuel bundle residues; tank storage of high-level liquid waste; interim storage of solid non-high-level wastes; interim storage of solidified high-level waste; and, transportation alternatives

  19. Alternatives for managing wastes from reactors and post-fission operations in the LWR fuel cycle. Volume 3. Alternatives for interim storage and transportation

    Energy Technology Data Exchange (ETDEWEB)

    1976-05-01

    Volume III of the five-volume report contains information on alternatives for interim storage and transportation. Section titles are: interim storage of spent fuel elements; interim storage of chop-leach fuel bundle residues; tank storage of high-level liquid waste; interim storage of solid non-high-level wastes; interim storage of solidified high-level waste; and, transportation alternatives. (JGB)

  20. Information Management Architecture for an Integrated Computing Environment for the Environmental Restoration Program. Volume 2, Interim business systems guidance

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    As part of the Environmental Restoration Program at Martin Marietta, IEM (Information Engineering Methodology) was developed as part of a complete and integrated approach to the progressive development and subsequent maintenance of automated data sharing systems. This approach is centered around the organization`s objectives, inherent data relationships, and business practices. IEM provides the Information Systems community with a tool kit of disciplined techniques supported by automated tools. It includes seven stages: Information Strategy Planning; Business Area Analysis; Business System Design; Technical Design; Construction; Transition; Production. This document focuses on the Business Systems Architecture.

  1. 75 FR 43922 - Interim Guidance for Determining Subject Matter Eligibility for Process Claims in View of Bilski...

    Science.gov (United States)

    2010-07-27

    ..., who do not routinely encounter claims that implicate the abstract idea exception. Under the principles... principles: Laws of nature, physical phenomena, and abstract ideas. See id. The Office has been using the so... marketing a product, comprising: Developing a shared marketing force, said shared marketing force including...

  2. 78 FR 3039 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-06; Performing a...

    Science.gov (United States)

    2013-01-15

    ... resulted in a complete loss of all ac electrical power at Units 1 through 5, a condition known as station blackout. In addition, all direct current electrical power was lost early in the event on Units 1 and 2...

  3. 75 FR 16202 - Office of New Reactors; Interim Staff Guidance on Ensuring Hazard-Consistent Seismic Input for...

    Science.gov (United States)

    2010-03-31

    ... CONTACT: Dr. Kimberly A. Hawkins, Chief, Structural Engineering Branch 2, Division of Engineering, Office...-415-0564 or e-mail: Kimberly.Hawkins@nrc.gov . SUPPLEMENTARY INFORMATION: The agency posts its issued...

  4. Information Management Architecture for an Integrated Computing Environment for the Environmental Restoration Program. Volume 2, Interim business systems guidance

    International Nuclear Information System (INIS)

    1994-09-01

    As part of the Environmental Restoration Program at Martin Marietta, IEM (Information Engineering Methodology) was developed as part of a complete and integrated approach to the progressive development and subsequent maintenance of automated data sharing systems. This approach is centered around the organization's objectives, inherent data relationships, and business practices. IEM provides the Information Systems community with a tool kit of disciplined techniques supported by automated tools. It includes seven stages: Information Strategy Planning; Business Area Analysis; Business System Design; Technical Design; Construction; Transition; Production. This document focuses on the Business Systems Architecture

  5. 75 FR 53353 - Notice of Availability of Final Interim Staff Guidance Document No. 25 “Pressure and Helium...

    Science.gov (United States)

    2010-08-31

    ... helium leakage testing and ASME Code required pressure (hydrostatic/pneumatic) testing that is specified.../doc-collections/isg/ ). A table containing the comments received from external stakeholders and the...

  6. Interim safety basis compliance matrix for Trenches 31 and 34

    International Nuclear Information System (INIS)

    Ames, R.R.

    1994-01-01

    The tables provided in this document identify the specific requirements and basis for the administrative controls established in the Westinghouse Hanford Company (WHC) Solid Waste Burial Ground (SWBG) Interim Safety Basis (ISB) for operation of the Project W-025, Mixed Waste Lined Landfill (Trenches 31 and 34). The tables document the necessary controls and implementing procedures to ensure compliance with the requirements of the ISB. These requirements provide a basis for future Unreviewed Safety Questions (USQ) screening of applicable procedure changes, proposed physical modifications, tests, experiments, and occurrences. Table 1 provides the SWBG interim Operational Safety Requirements administrative controls matrix. The specific assumptions and commitments used in the safety analysis documents applicable to disposal of mixed wastes in Trenches 31 and 34 are provided in Table 2. Table 3 is provided to document the potential engineered and administrative mitigating features identified in the Preliminary Hazard Analysis (PHA) for disposal of mixed waste

  7. Plutonium Finishing Plant. Interim plutonium stabilization engineering study

    Energy Technology Data Exchange (ETDEWEB)

    Sevigny, G.J.; Gallucci, R.H.; Garrett, S.M.K.; Geeting, J.G.H.; Goheen, R.S.; Molton, P.M.; Templeton, K.J.; Villegas, A.J. [Pacific Northwest Lab., Richland, WA (United States); Nass, R. [Nuclear Fuel Services, Inc. (United States)

    1995-08-01

    This report provides the results of an engineering study that evaluated the available technologies for stabilizing the plutonium stored at the Plutonium Finishing Plant located at the hanford Site in southeastern Washington. Further processing of the plutonium may be required to prepare the plutonium for interim (<50 years) storage. Specifically this document provides the current plutonium inventory and characterization, the initial screening process, and the process descriptions and flowsheets of the technologies that passed the initial screening. The conclusions and recommendations also are provided. The information contained in this report will be used to assist in the preparation of the environmental impact statement and to help decision makers determine which is the preferred technology to process the plutonium for interim storage.

  8. 105-C Reactor interim safe storage project technology integration plan

    International Nuclear Information System (INIS)

    Pulsford, S.K.

    1997-01-01

    The 105-C Reactor Interim Safe Storage Project Technology Integration Plan involves the decontamination, dismantlement, and interim safe storage of a surplus production reactor. A major goal is to identify and demonstrate new and innovative D and D technologies that will reduce costs, shorten schedules, enhance safety, and have the potential for general use across the RL complex. Innovative technologies are to be demonstrated in the following areas: Characterization; Decontamination; Waste Disposition; Dismantlement, Segmentation, and Demolition; Facility Stabilization; and Health and Safety. The evaluation and ranking of innovative technologies has been completed. Demonstrations will be selected from the ranked technologies according to priority. The contractor team members will review and evaluate the demonstration performances and make final recommendations to DOE

  9. Rehabilitation of failing dentition with interim immediate denture prosthesis

    Directory of Open Access Journals (Sweden)

    Amit Sharma

    2016-01-01

    Full Text Available Advances in therapy have helped patients with periodontal disease to retain part of their natural dentition for an extended period. These patients can be well served by properly designed removable partial dentures. For the patient facing the loss of all his/her remaining natural teeth, there are three treatment options. One is for the patient to have all remaining teeth extracted and wait for 6–8 weeks for the extraction sites to heal. The conventional complete denture is made following healing, leaving the patient without teeth not only during the healing phase but also during the time required for the fabrication of the conventional complete denture. A second option is to convert an existing removable partial denture into an interim immediate complete denture. A third option is to make a conventional immediate complete denture. The aim of this clinical report was to describe the fabrication of interim immediate denture in a patient with hopeless existing dentition.

  10. Plutonium Finishing Plant. Interim plutonium stabilization engineering study

    International Nuclear Information System (INIS)

    Sevigny, G.J.; Gallucci, R.H.; Garrett, S.M.K.; Geeting, J.G.H.; Goheen, R.S.; Molton, P.M.; Templeton, K.J.; Villegas, A.J.; Nass, R.

    1995-08-01

    This report provides the results of an engineering study that evaluated the available technologies for stabilizing the plutonium stored at the Plutonium Finishing Plant located at the hanford Site in southeastern Washington. Further processing of the plutonium may be required to prepare the plutonium for interim (<50 years) storage. Specifically this document provides the current plutonium inventory and characterization, the initial screening process, and the process descriptions and flowsheets of the technologies that passed the initial screening. The conclusions and recommendations also are provided. The information contained in this report will be used to assist in the preparation of the environmental impact statement and to help decision makers determine which is the preferred technology to process the plutonium for interim storage

  11. 105-H Reactor Interim Safe Storage Project Final Report

    International Nuclear Information System (INIS)

    Ison, E.G.

    2008-01-01

    The following information documents the decontamination and decommissioning of the 105-H Reactor facility, and placement of the reactor core into interim safe storage. The D and D of the facility included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, decontamination, demolition of the structure, and restoration of the site. The ISS work also included construction of the safe storage enclosure, which required the installation of a new roofing system, power and lighting, a remote monitoring system, and ventilation components.

  12. Gender Issues and Social Science Education - An Interim Report

    OpenAIRE

    Mechthild Oechsle; Karin Wetterau

    2005-01-01

    This article discusses the relevance of gender issues for social science education and gives an interim report on developments in the field. We explore the significance of gender differences in political attitudes and preferences for certain topics of instruction, consider differences in the learning needs of male and female students, and analyse the curricular challenges involved in incorporating the gender perspective in the classroom. Deficits in the curricular coverage of gender issues re...

  13. In vitro resistance of reinforced interim fixed partial dentures.

    Science.gov (United States)

    Pfeiffer, Peter; Grube, Lars

    2003-02-01

    Comprehensive restorative dental treatment often necessitates the use of interim fixed partial dentures (FPDs) with high stiffness, especially in long-span restorations or areas of heavy occlusal stress. This in vitro study evaluated the fracture load of interim FPDs made with various materials and span lengths. Groups (n = 3) of interim FPDs were fabricated with prosthodontic resin materials on 2 abutments with 3 different pontic widths of 3 units (12 mm), 4 units (19 mm), and 5 units (30 mm). The following materials were tested: (1) a thermoplastic polymer (Promysan Star), (2) Promysan Star with a veneering composite (Vita Zeta), (3) a nonimpregnated polyethylene fiber reinforced resin (Ribbond) with a veneering composite (Sinfony), (4) an impregnated fiber reinforced composite system (Targis/Vectris), and (5) a conventional polymethyl methacrylate, Biodent K+B, (control group). After 5000 thermocycles in 2 water baths at 5 degrees and 55 degrees C, the FPDs were temporarily fixed with a provisional cement on the corresponding abutments and subjected to 3-point bending until fracture by a universal testing machine. Statistical analysis consisted of an analysis of variance (ANOVA, 1-way, 2-way) and Bonferroni-Dunn's multiple comparisons post hoc analysis for test groups (alpha = .05). Fracture resistance (N) differed significantly for 3 (mean: 640 +/- 146 N), 4 (626 +/- 229 N), and 5 unit (658 +/- 98 N) Targis/Vectris FPDs compared with the corresponding Promysan (284 +/- 21 N to 125 +/- 73 N), Biodent K+B (247 +/- 91 N to 218 +/- 85 N), and Promysan/Vita Zeta (95 +/- 15 N to 82 +/- 6 N) groups (P < .05). Significant differences were obtained for the 4 and 5 unit Targis/Vectris FPDs compared with the Sinfony/Ribbond FPDs (281 +/- 25 N - 252 +/- 74 N) for the corresponding pontic spans. Within the limitations of this in vitro study the impregnated fiber reinforcement may considerably enhanced the fracture resistance of interim FPDs of different span lengths.

  14. Interim Sanitary Landfill Groundwater Monitoring Report. 1997 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-01

    Eight wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Interim Sanitary Landfill at the Savannah River Site (SRS). These wells are sampled semiannually to comply with the South Carolina Department of Health and Environmental Control Modified Municipal Solid Waste Permit 025500-1120 (formerly dWP-087A) and as part of the SRS Groundwater Monitoring Program.

  15. Interim Stabilization Equipment Essential and Support Drawing Plan

    International Nuclear Information System (INIS)

    HORNER, T.M.

    2000-01-01

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. [CHG 2000a]. Support Drawings are those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings. [CHG 2000a

  16. Interim Stabilization Equipment Essential and Support Drawing Plan

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings: Those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. Support Drawings: Those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings

  17. FRACTIONAL CRYSTALLIZATION TESTING WITH INTERIM PRETREATMENT SYSTEM FEEDS

    International Nuclear Information System (INIS)

    HERTING DL

    2008-01-01

    The fractional crystallization process was developed as a pretreatment method for saltcake waste retrieved from Hanford single-shell tanks (SST). The process separates the retrieved SST waste into a high-level waste stream containing the bulk of the radionuclides and a low-activity waste stream containing the bulk of the nonradioactive sodium salts. The Interim Pretreatment System project shifted the focus on pretreatment planning from SST waste to double-shell tank waste

  18. 105-H Reactor Interim Safe Storage Project Final Report

    Energy Technology Data Exchange (ETDEWEB)

    E.G. Ison

    2008-11-08

    The following information documents the decontamination and decommissioning of the 105-H Reactor facility, and placement of the reactor core into interim safe storage. The D&D of the facility included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, decontamination, demolition of the structure, and restoration of the site. The ISS work also included construction of the safe storage enclosure, which required the installation of a new roofing system, power and lighting, a remote monitoring system, and ventilation components.

  19. Fluoride ion release and solubility of fluoride enriched interim cements.

    Science.gov (United States)

    Lewinstein, Israel; Block, Jonathan; Melamed, Guy; Dolev, Eran; Matalon, Shlomo; Ormianer, Zeev

    2014-08-01

    Interim and definitive restorations cemented with interim cements for a prolonged interval are susceptible to bacterial infiltration and caries formation. The purpose of this in vitro study was to evaluate the long-term fluoride release and solubility of aged ZnO-based interim cements enriched separately with 0.4% NaF and SnF2. Four different brands of cements (Tempbond, Tempbond NE, Procem, and Freegenol) were tested for fluoride release and solubility. For every test, 6 disk specimens of each cement with NaF and SnF2, and 6 with no fluoride enrichment (control) were fabricated, for a total of 72 specimens. The disks were incubated in deionized water. Fluoride ion release was recorded at 1, 7, 14, 21, 63, 91, and 182 days. Solubility was calculated as weight percent after 90 days of incubation. The data were analyzed by analysis of variance with repeated measures and the Tukey honestly significant difference post hoc test (Pfluorides released fluoride ions for at least 182 days. Cements mixed with NaF released more fluoride ions than those mixed with SnF2 (P.97), indicating a diffusion-controlled fluoride release. Cement and fluoride types were the main affecting factors in fluoride ion release. The addition of fluorides slightly increased the solubility of the cements. Given their long-term sustained and diffusive controlled release, these fluorides, particularly NaF when mixed with ZnO-based interim cements, may be useful for caries prevention under provisionally cemented restorations. Copyright © 2014 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  20. Interim dry storage system technologies and innovations VARNA 2002

    International Nuclear Information System (INIS)

    Chollet, P.; Guenon, Y.

    2002-01-01

    The main concepts of the TN24 Family and NUHOMS System are explained in the paper. It is discussed how the NPPs specific requirements and economics trends contributes to the growing families of interim dry storage systems delivered under COGEMA LOGICTICS license. It is concluded that modular solutions are currently dominating because they are derived from main concepts evolved over time, benefited from both the transport aspects with internationally recognised stringent regulations, and various specific ISFSI requirements and economic trends

  1. Waste Encapsulation and Storage Facility interim operational safety requirements

    CERN Document Server

    Covey, L I

    2000-01-01

    The Interim Operational Safety Requirements (IOSRs) for the Waste Encapsulation and Storage Facility (WESF) define acceptable conditions, safe boundaries, bases thereof, and management or administrative controls required to ensure safe operation during receipt and inspection of cesium and strontium capsules from private irradiators; decontamination of the capsules and equipment; surveillance of the stored capsules; and maintenance activities. Controls required for public safety, significant defense-in-depth, significant worker safety, and for maintaining radiological consequences below risk evaluation guidelines (EGs) are included.

  2. Interim reliability evaluation program, Browns Ferry fault trees

    International Nuclear Information System (INIS)

    Stewart, M.E.

    1981-01-01

    An abbreviated fault tree method is used to evaluate and model Browns Ferry systems in the Interim Reliability Evaluation programs, simplifying the recording and displaying of events, yet maintaining the system of identifying faults. The level of investigation is not changed. The analytical thought process inherent in the conventional method is not compromised. But the abbreviated method takes less time, and the fault modes are much more visible

  3. ICRP guidance on radioactive waste disposal

    International Nuclear Information System (INIS)

    Cooper, J.R.

    2002-01-01

    The International Commission on Radiological Protection (ICRP) issued recommendations for a system of radiological protection in 1991 as the 1990 Recommendations. Guidance on the application of these recommendations in the general area of waste disposal was issued in 1997 as Publication 77 and guidance specific to disposal of solid long-lived radioactive waste was issued as Publication 81. This paper summarises ICRP guidance in radiological protection requirements for waste disposal concentrating on the ones of relevance to the geological disposal of solid radioactive waste. Suggestions are made for areas where further work is required to apply the ICRP guidance. (author)

  4. Hybrid Guidance System for Relative Navigation Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Future NASA architectures and missions will involve many distributed platforms that must work together. This in turn requires guidance, navigation and control...

  5. Force Dental Facility Design Guidance (AFDFDG)

    National Research Council Canada - National Science Library

    Kane, James

    1998-01-01

    This design guidance includes total USAF Dental Clinic facility space planning, construction criteria, and medical gases specification inclusive of architectural, mechanical, and electrical design requirements...

  6. The Interim Financial Reporting in the Spirit of the IAS 34 Norm

    OpenAIRE

    Ovidia Doinea

    2008-01-01

    The role of an interim financial reporting is to allow the information users to acknowledge the activity of an entity on period shorter than financial exercise from the perspective of the available profits and cash flows generated as well as from the point of view of its financial position and liquidity. The interim financial reporting includes a complete or condensed set of financial statements which target to update the last financial reporting, usually the annual report. The interim financ...

  7. Immobilized high-level waste interim storage alternatives generation and analysis and decision report

    International Nuclear Information System (INIS)

    CALMUS, R.B.

    1999-01-01

    This report presents a study of alternative system architectures to provide onsite interim storage for the immobilized high-level waste produced by the Tank Waste Remediation System (TWRS) privatization vendor. It examines the contract and program changes that have occurred and evaluates their impacts on the baseline immobilized high-level waste (IHLW) interim storage strategy. In addition, this report documents the recommended initial interim storage architecture and implementation path forward

  8. Interim guidelines for protecting fire-fighting personnel from multiple hazards at nuclear plant sites

    International Nuclear Information System (INIS)

    Klein, A.R.; Bloom, C.W.

    1989-07-01

    This report provides interim guidelines for reducing the impact to fire fighting and other supporting emergency response personnel from the multiple hazards of radiation, heat stress, and trauma when fighting a fire in a United States commercial nuclear power plant. Interim guidelines are provided for fire brigade composition, training, equipment, procedures, strategies, heat stress and trauma. In addition, task definitions are provided to evaluate and further enhance the interim guidelines over the long term. 19 refs

  9. Effect of polyester fiber reinforcement on the mechanical properties of interim fixed partial dentures

    OpenAIRE

    Gopichander, N.; Halini Kumarai, K.V.; Vasanthakumar, M.

    2015-01-01

    Background: Different reinforcements currently available for interim fixed partial denture (FPD) materials do not provide the ideal strength for long-term use. Therefore, the aim of this investigation was to develop a more ideal provisional material for long-term use with better mechanical properties. This study evaluated the effectiveness of polyester fiber reinforcement on different interim FPD materials. Methods: Thirty resin-bonded FPDs were constructed from three provisional interim F...

  10. Agent Based Individual Traffic Guidance

    DEFF Research Database (Denmark)

    Wanscher, Jørgen

    This thesis investigates the possibilities in applying Operations Research (OR) to autonomous vehicular traffic. The explicit difference to most other research today is that we presume that an agent is present in every vehicle - hence Agent Based Individual Traffic guidance (ABIT). The next...... evolutionary step for the in-vehicle route planners is the introduction of two-way communication. We presume that the agent is capable of exactly this. Based on this presumption we discuss the possibilities and define a taxonomy and use this to discuss the ABIT system. Based on a set of scenarios we conclude...... that the system can be divided into two separate constituents. The immediate dispersion, which is used for small areas and quick response, and the individual alleviation, which considers the longer distance decision support. Both of these require intrinsicate models and cost functions which at the beginning...

  11. Physical Guidance of Cell Migration

    Science.gov (United States)

    Losert, Wolfgang

    Cells migrate as individuals or groups, to perform critical functions in life from organ development to wound healing and the immune response. While directed migration of cells is often mediated by chemical or physical gradients, our recent work has demonstrated that the physical properties of the microenvironment can also control and guide migration. I will describe how an underlying wave-like process of the actin scaffolding drives persistent migration, and how such actin waves are nucleated and guided by the texture of the microenvironment. Based on this observation we design textures capable of guiding cells in a single preferred direction using local asymmetries in nano/microtopography on subcellular scales, or altering migration in other ways. This phenomenon is observed both for the pseudopod-dominated migration of Dictyostelium cells and for the lamellipod-driven migration of human neutrophils. The conservation of this mechanism across cell types suggests that actin-wave-based guidance is important in biology and physiology.

  12. Federal Guidance Report No. 8: Guidance for the Control of Radiation Hazards in Uranium Mining

    Science.gov (United States)

    This report contains background material used in the development of guidance concerning radiation protection in the mining of uranium ore, and seeks to provide guidance for long-term radiation protection in uranium mining.

  13. Interim policy on establishment and operation of internet open, anonymous information servers and services

    OpenAIRE

    Acting Dean of Computer and Information Services

    1995-01-01

    Purpose. To establish interim NPS general policy regarding establishment and operation of Open, Anonymous Information Servers and Services, such as World Wide Web (http), Gopher, Anonymous FTP, etc...

  14. 78 FR 48175 - Retrospective Review of Draft Guidance Documents Issued Before 2010; Withdrawal of Guidances

    Science.gov (United States)

    2013-08-07

    ... issuing final versions of the guidances. In many cases, guidances were not finalized most often because of... many draft guidances published before 2010. As a result of this review, CDER identified 23 draft... advertisements; Drug safety; Electronic submissions; Labeling; OTC products; Pharmacology and toxicology...

  15. Minimum variation guidance laws for interceptor missiles

    NARCIS (Netherlands)

    Weiss, M.; Shima, T.

    2014-01-01

    This paper introduces a new approach to guidance law design using linear quadratic optimal control theory, minimizing throughout the engagement the variation of the control input as well as the integral control effort. The guidance law is derived for arbitrary order missile dynamics and target

  16. Driving change : sustainable development action plans Guidance

    OpenAIRE

    Sustainable Development Commission

    2008-01-01

    This guidance builds upon the Sustainable Development Commission’s previous guidance, Getting Started (August 2005), which set out the basic elements that the Sustainable Development Commission would expect to see in a good Sustainable Development Action Plan. Publisher PDF Original published August 2005.

  17. Standards for School Guidance Programs in Maryland.

    Science.gov (United States)

    Maryland State Dept. of Education, Baltimore. Div. of Compensatory, Urban, and Supplementary Programs.

    This brochure is a checklist to rate school compliance with the standards for school guidance programs in Maryland, which were developed by the Maryland State Department of Education. The first set of standards addresses the philosophy and goals of school guidance programs in Maryland and the extent to which program goals and objectives are…

  18. Guidance trajectories for aeroassisted orbital transfer

    Science.gov (United States)

    Miele, A.

    1990-01-01

    Research on aerobraking guidance schemes is presented. The intent is to produce aerobraking guidance trajectories exhibiting many of the desirable characteristics of optimal aerobraking trajectories. Both one-control schemes and two-control schemes are studied. The research is in the interest of aeroassisted flight experiment vehicles (AFE) and aeroassisted orbital transfer (AOT) vehicles.

  19. 33 CFR 385.5 - Guidance memoranda.

    Science.gov (United States)

    2010-07-01

    ... ability of the Corps of Engineers, the South Florida Water Management District, and other non-Federal... § 385.5 Guidance memoranda. (a) General. (1) Technical guidance for internal management of Corps of...) General format and content of Project Implementation Reports (§ 385.26(a)); (ii) Instructions for...

  20. Guidance for performing preliminary assessments under CERCLA

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-09-01

    EPA headquarters and a national site assessment workgroup produced this guidance for Regional, State, and contractor staff who manage or perform preliminary assessments (PAs). EPA has focused this guidance on the types of sites and site conditions most commonly encountered. The PA approach described in this guidance is generally applicable to a wide variety of sites. However, because of the variability among sites, the amount of information available, and the level of investigative effort required, it is not possible to provide guidance that is equally applicable to all sites. PA investigators should recognize this and be aware that variation from this guidance may be necessary for some sites, particularly for PAs performed at Federal facilities, PAs conducted under EPA`s Environmental Priorities Initiative (EPI), and PAs at sites that have previously been extensively investigated by EPA or others. The purpose of this guidance is to provide instructions for conducting a PA and reporting results. This guidance discusses the information required to evaluate a site and how to obtain it, how to score a site, and reporting requirements. This document also provides guidelines and instruction on PA evaluation, scoring, and the use of standard PA scoresheets. The overall goal of this guidance is to assist PA investigators in conducting high-quality assessments that result in correct site screening or further action recommendations on a nationally consistent basis.

  1. HANDBOOK: HAZARDOUS WASTE INCINERATION MEASUREMENT GUIDANCE

    Science.gov (United States)

    This publication, Volume III of the Hazardous Waste Incineration Guidance Series, contains general guidance to permit writers in reviewing hazardous waste incineration permit applications and trial burn plans. he handbook is a how-to document dealing with how incineration measure...

  2. Career Guidance and Public Mental Health

    Science.gov (United States)

    Robertson, Peter J.

    2013-01-01

    Career guidance may have the potential to promote public health by contributing positively to both the prevention of mental health conditions and to population level well-being. The policy implications of this possibility have received little attention. Career guidance agencies are well placed to reach key target groups. Producing persuasive…

  3. Ultrasound Guidance for Botulinum Neurotoxin Chemodenervation Procedures.

    Science.gov (United States)

    Alter, Katharine E; Karp, Barbara I

    2017-12-28

    Injections of botulinum neurotoxins (BoNTs) are prescribed by clinicians for a variety of disorders that cause over-activity of muscles; glands; pain and other structures. Accurately targeting the structure for injection is one of the principle goals when performing BoNTs procedures. Traditionally; injections have been guided by anatomic landmarks; palpation; range of motion; electromyography or electrical stimulation. Ultrasound (US) based imaging based guidance overcomes some of the limitations of traditional techniques. US and/or US combined with traditional guidance techniques is utilized and or recommended by many expert clinicians; authors and in practice guidelines by professional academies. This article reviews the advantages and disadvantages of available guidance techniques including US as well as technical aspects of US guidance and a focused literature review related to US guidance for chemodenervation procedures including BoNTs injection.

  4. Comparative study of marginal adaptation and mechanical properties of CAD/CAM versus dual polymerized interim fixed dental prosthesis

    Directory of Open Access Journals (Sweden)

    Marwa Eltayeb I Elagra

    2014-01-01

    Conclusions: CAD/CAM fabricated interim restorations have better marginal adaptation, wear resistance and fracture resistance than dual polymerized interim restorations hence, might withstand longer duration in the oral cavity.

  5. Environmental survey of two interim dumpsites, Middle Atlantic Bight from 05 November 1973 to 10 November 1973 (NODC Accession 7501280)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — A second oceanographic survey cruise was made to an interim municipal sludge dumpsite and initially to an interim dumpsite for the disposal of industrial acid waste...

  6. Kepler Fine Guidance Sensor Data

    Science.gov (United States)

    Van Cleve, Jeffrey; Campbell, Jennifer Roseanna

    2017-01-01

    The Kepler and K2 missions collected Fine Guidance Sensor (FGS) data in addition to the science data, as discussed in the Kepler Instrument Handbook (KIH, Van Cleve and Caldwell 2016). The FGS CCDs are frame transfer devices (KIH Table 7) located in the corners of the Kepler focal plane (KIH Figure 24), which are read out 10 times every second. The FGS data are being made available to the user community for scientific analysis as flux and centroid time series, along with a limited number of FGS full frame images which may be useful for constructing a World Coordinate System (WCS) or otherwise putting the time series data in context. This document will describe the data content and file format, and give example MATLAB scripts to read the time series. There are three file types delivered as the FGS data.1. Flux and Centroid (FLC) data: time series of star signal and centroid data. 2. Ancillary FGS Reference (AFR) data: catalog of information about the observed stars in the FLC data. 3. FGS Full-Frame Image (FGI) data: full-frame image snapshots of the FGS CCDs.

  7. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Interaction with other offices and interim actions. 93.401 Section 93.401 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES... Human Services General Information § 93.401 Interaction with other offices and interim actions. (a) ORI...

  8. 42 CFR 417.572 - Budget and enrollment forecast and interim reports.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Budget and enrollment forecast and interim reports... PLANS, AND HEALTH CARE PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.572 Budget and enrollment forecast and interim reports. (a) Annual submittal. The HMO or CMP must submit an annual operating budget...

  9. Conceptual design report for immobilized high-level waste interim storage facility (Phase 1)

    Energy Technology Data Exchange (ETDEWEB)

    Burgard, K.C.

    1998-04-09

    The Hanford Site Canister Storage Building (CSB Bldg. 212H) will be utilized to interim store Phase 1 HLW products. Project W-464, Immobilized High-Level Waste Interim Storage, will procure an onsite transportation system and retrofit the CSB to accommodate the Phase 1 HLW products. The Conceptual Design Report establishes the Project W-464 technical and cost basis.

  10. EPA Interim Evaluation of 2016-2017 Milestone Progress in the Chesapeake Bay Watershed

    Science.gov (United States)

    This page provides the EPA interim evaluations of the 2016-2017 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2016-2017 milestones, recognizing the achievements made in 2016.

  11. EPA Interim Evaluation of 2012-2013 Milestone Progress in the Chesapeake Bay Watershed

    Science.gov (United States)

    This page provides the EPA interim evaluations of the 2012-2013 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2012-2013 milestones, recognizing the achievements made in 2012.

  12. EPA Interim Evaluation of 2014-2015 Milestone Progress in the Chesapeake Bay Watershed

    Science.gov (United States)

    This page provides the EPA interim evaluations of the 2014-2015 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2014-2015 milestones, recognizing the achievements made in 2014.

  13. 40 CFR 80.156 - Liability for violations of the interim detergent program controls and prohibitions.

    Science.gov (United States)

    2010-07-01

    ... interim detergent program controls and prohibitions. 80.156 Section 80.156 Protection of Environment... Detergent Gasoline § 80.156 Liability for violations of the interim detergent program controls and..., carrier, distributor, reseller, retailer, wholesale purchaser-consumer, oxygenate blender, or detergent...

  14. 40 CFR 80.155 - Interim detergent program controls and prohibitions.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Interim detergent program controls and... PROGRAMS (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Detergent Gasoline § 80.155 Interim detergent... wholesale purchaser-consumer, and no person shall detergent-additize gasoline, unless such gasoline is...

  15. Conceptual design report for immobilized high-level waste interim storage facility (Phase 1)

    Energy Technology Data Exchange (ETDEWEB)

    Burgard, K.C.

    1998-06-02

    The Hanford Site Canister Storage Building (CSB Bldg. 212H) will be utilized to interim store Phase 1 HLW products. Project W-464, Immobilized High-Level Waste Interim Storage, will procure an onsite transportation system and retrofit the CSB to accommodate the Phase 1 HLW products. The Conceptual Design Report establishes the Project W-464 technical and cost basis.

  16. PROJECT W-551 INTERIM PRETREATMENT SYSTEM TECHNOLOGY SELECTION SUMMARY DECISION REPORT AND RECOMMENDATION

    Energy Technology Data Exchange (ETDEWEB)

    CONRAD EA

    2008-08-12

    This report provides the conclusions of the tank farm interim pretreatment technology decision process. It documents the methodology, data, and results of the selection of cross-flow filtration and ion exchange technologies for implementation in project W-551, Interim Pretreatment System. This selection resulted from the evaluation of specific scope criteria using quantitative and qualitative analyses, group workshops, and technical expert personnel.

  17. 32 CFR 643.36 - Policy-Interim leasing of excess properties to facilitate economic readjustment.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Policy-Interim leasing of excess properties to facilitate economic readjustment. 643.36 Section 643.36 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) REAL PROPERTY REAL ESTATE Policy § 643.36 Policy—Interim leasing of excess...

  18. PROJECT W-551 INTERIM PRETREATMENT SYSTEM TECHNOLOGY SELECTION SUMMARY DECISION REPORT AND RECOMMENDATION

    International Nuclear Information System (INIS)

    CONRAD EA

    2008-01-01

    This report provides the conclusions of the tank farm interim pretreatment technology decision process. It documents the methodology, data, and results of the selection of cross-flow filtration and ion exchange technologies for implementation in project W-551, Interim Pretreatment System. This selection resulted from the evaluation of specific scope criteria using quantitative and qualitative analyses, group workshops, and technical expert personnel

  19. International validation study for interim PET in ABVD-treated, advanced-stage hodgkin lymphoma

    DEFF Research Database (Denmark)

    Biggi, Alberto; Gallamini, Andrea; Chauvie, Stephane

    2013-01-01

    At present, there are no standard criteria that have been validated for interim PET reporting in lymphoma. In 2009, an international workshop attended by hematologists and nuclear medicine experts in Deauville, France, proposed to develop simple and reproducible rules for interim PET reporting...

  20. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  1. Optimal guidance law in quantum mechanics

    International Nuclear Information System (INIS)

    Yang, Ciann-Dong; Cheng, Lieh-Lieh

    2013-01-01

    Following de Broglie’s idea of a pilot wave, this paper treats quantum mechanics as a problem of stochastic optimal guidance law design. The guidance scenario considered in the quantum world is that an electron is the flight vehicle to be guided and its accompanying pilot wave is the guidance law to be designed so as to guide the electron to a random target driven by the Wiener process, while minimizing a cost-to-go function. After solving the stochastic optimal guidance problem by differential dynamic programming, we point out that the optimal pilot wave guiding the particle’s motion is just the wavefunction Ψ(t,x), a solution to the Schrödinger equation; meanwhile, the closed-loop guidance system forms a complex state–space dynamics for Ψ(t,x), from which quantum operators emerge naturally. Quantum trajectories under the action of the optimal guidance law are solved and their statistical distribution is shown to coincide with the prediction of the probability density function Ψ ∗ Ψ. -- Highlights: •Treating quantum mechanics as a pursuit-evasion game. •Reveal an interesting analogy between guided flight motion and guided quantum motion. •Solve optimal quantum guidance problem by dynamic programming. •Gives a formal proof of de Broglie–Bohm’s idea of a pilot wave. •The optimal pilot wave is shown to be a wavefunction solved from Schrödinger equation

  2. Optimal guidance law in quantum mechanics

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Ciann-Dong, E-mail: cdyang@mail.ncku.edu.tw; Cheng, Lieh-Lieh, E-mail: leo8101@hotmail.com

    2013-11-15

    Following de Broglie’s idea of a pilot wave, this paper treats quantum mechanics as a problem of stochastic optimal guidance law design. The guidance scenario considered in the quantum world is that an electron is the flight vehicle to be guided and its accompanying pilot wave is the guidance law to be designed so as to guide the electron to a random target driven by the Wiener process, while minimizing a cost-to-go function. After solving the stochastic optimal guidance problem by differential dynamic programming, we point out that the optimal pilot wave guiding the particle’s motion is just the wavefunction Ψ(t,x), a solution to the Schrödinger equation; meanwhile, the closed-loop guidance system forms a complex state–space dynamics for Ψ(t,x), from which quantum operators emerge naturally. Quantum trajectories under the action of the optimal guidance law are solved and their statistical distribution is shown to coincide with the prediction of the probability density function Ψ{sup ∗}Ψ. -- Highlights: •Treating quantum mechanics as a pursuit-evasion game. •Reveal an interesting analogy between guided flight motion and guided quantum motion. •Solve optimal quantum guidance problem by dynamic programming. •Gives a formal proof of de Broglie–Bohm’s idea of a pilot wave. •The optimal pilot wave is shown to be a wavefunction solved from Schrödinger equation.

  3. Best Available Technology (BAT) guidance for radiological liquid effluents at US Department of Energy Facilities

    International Nuclear Information System (INIS)

    Wallo, A. III; Peterson, H.T. Jr.; Ikenberry, T.A.; Baker, R.E.

    1993-01-01

    The US Department of Energy (DOE), in DOE Order 5400.5 (1990), directs operators of DOE facilities to apply the Best Available Technology (BAT) to control radiological liquid effluents from these facilities when specific conditions are present. DOE has published interim guidance to assist facility operators in knowing when a BAT analysis is needed and how such an analysis should be performed and documented. The purpose of the guidance is to provide a uniform basis in determining BAT throughout DOE and to assist in evaluating BAT determinations during programmatic audits. The BAT analysis process involves characterizing the effluent source; identifying and selecting candidate control technologies; evaluating the potential environmental, operational, resource, and economic impacts of the control technologies; developing an evaluation matrix for comparing the technologies; selecting the BAT; and documenting the evaluation process. The BAT analysis process provides a basis for consistent evaluation of liquid effluent releases, yet allows an individual site or facility the flexibility to address site-specific issues or concerns in the most appropriate manner

  4. Miniscrew Supported Interim Tooth Replacement: A Temporary Alternative

    Directory of Open Access Journals (Sweden)

    Gurkeerat Singh

    2012-01-01

    Full Text Available Replacement of congenitally missing anterior tooth poses special problems in growing patients. Because an adolescent is typically self- conscious about removing an appliance and revealing a large edentulous space, a removable single tooth partial denture or retainer is an undesirable option. The temporary anchorage devices are invasive and the best recommended for malocclusion that cannot be effectively managed with conventional mechanics. The use of orthodontic miniscrews for interim restorations before the completion of skeletal growth has been used successfully unlike osseointegrated implants lacking the compensatory growth mechanisms of the natural dentition. The following case reports show an esthetic alternative to temporary tooth replacement using miniscrews.

  5. Hanford low-level tank waste interim performance assessment

    Energy Technology Data Exchange (ETDEWEB)

    Mann, F.M.

    1997-09-12

    The Hanford Low-Level Tank Waste Interim Performance Assessment examines the long-term environmental and human health effects associated with the disposal of the low-level fraction of the Hanford single and double-shell tank waste in the Hanford Site 200 East Area. This report was prepared as a good management practice to provide needed information about the relationship between the disposal system design and performance early in the disposal system project cycle. The calculations in this performance assessment show that the disposal of the low-level fraction can meet environmental and health performance objectives.

  6. Nondestructive evaluation of creep-fatigue damage: an interim report

    International Nuclear Information System (INIS)

    Nickell, R.E.

    1977-02-01

    In view of the uncertainties involved in designing against creep-fatigue failure and the consequences of such failures in Class 1 nuclear components that operate at elevated temperature, the possibility of intermittent or even continuous non-destructive examination of these components has been considered. In this interim report some preliminary results on magnetic force and ultrasonic evaluation of creep-fatigue damage in an LMFBR steam generator material are presented. These results indicate that the non-destructive evaluation of pure creep damage will be extremely difficult. A set of biaxial creep-fatigue tests that are designed to discriminate between various failure theories is also described

  7. Cost estimation of interim dry storage for Atucha I NPP

    International Nuclear Information System (INIS)

    Bergallo, Juan E.; Fuenzalida Troyano, Carlos S.

    2007-01-01

    A joint effort between NASA and CNEA has been performed in order to evaluate and fix the strategy of interim spent fuel storage for Atucha I nuclear power plant. In this work the cost estimation on the proposed system was performed in order to fix the parameter and design criteria for the next engineering step. The main results achieved show that both alternatives are all in the same range of costs per unit of mass to be stored, the impact on electricity cost is less than 1 US mills/KWh and the scaling factor achieved is 0.85. (author) [es

  8. Hospital clinicians' iPad use: an interim report.

    Science.gov (United States)

    Witman, Lydia

    2012-01-01

    An increasing number of hospital libraries are supporting the use of tablet computers such as iPads for access to information resources. To date, this adoption of tablets is not supported by high-quality research evidence. This article provides an interim report on a formal study of clinicians' use of iPads in the hospital setting, currently being conducted at Pennsylvania Hospital in Philadelphia. Other hospital librarians may wish to consider similar factors when beginning to support the use of tablet computers at their own institutions.

  9. Interim report on the TMI-2 purification filter examination

    International Nuclear Information System (INIS)

    Mason, R.E.; Hobbins, R.R.; Cook, B.A.; MacDonald, P.E.

    1983-02-01

    Filters from the purification/makeup system of the Three Mile Island Unit 2 Reactor were examined after the March 28, 1979, accident to determine the character of the debris transported to the filters. The general condition of the filters is presented. Material was removed from the filters and examined. The elemental and radionuclide makeup of the debris is discussed. Distribution of particle size and shape is presentd for some of the material examined. This is an interim report. When the investigation is completed, another report summarizing all of the data will be issued

  10. The PDF4LHC Working Group Interim Report

    CERN Document Server

    Alekhin, Sergey; Ball, Richard D.; Bertone, Valerio; Blumlein, Johannes; Botje, Michiel; Butterworth, Jon; Cerutti, Francesco; Cooper-Sarkar, Amanda; de Roeck, Albert; Del Debbio, Luigi; Feltesse, Joel; Forte, Stefano; Glazov, Alexander; Guffanti, Alberto; Gwenlan, Claire; Huston, Joey; Jimenez-Delgado, Pedro; Lai, Hung-Liang; Latorre, Jose I.; McNulty, Ronan; Nadolsky, Pavel; Olaf Moch, Sven; Pumplin, Jon; Radescu, Voica; Rojo, Juan; Sjostrand, Torbjorn; Stirling, W.J.; Stump, Daniel; Thorne, Robert S.; Ubiali, Maria; Vicini, Alessandro; Watt, Graeme; Yuan, C.-P.

    2011-01-01

    This document is intended as a study of benchmark cross sections at the LHC (at 7 TeV) at NLO using modern parton distribution functions currently available from the 6 PDF fitting groups that have participated in this exercise. It also contains a succinct user guide to the computation of PDFs, uncertainties and correlations using available PDF sets. A companion note, also submitted to the archive, provides an interim summary of the current recommendations of the PDF4LHC working group for the use of parton distribution functions and of PDF uncertainties at the LHC, for cross section and cross section uncertainty calculations.

  11. Hanford low-level tank waste interim performance assessment

    International Nuclear Information System (INIS)

    Mann, F.M.

    1997-01-01

    The Hanford Low-Level Tank Waste Interim Performance Assessment examines the long-term environmental and human health effects associated with the disposal of the low-level fraction of the Hanford single and double-shell tank waste in the Hanford Site 200 East Area. This report was prepared as a good management practice to provide needed information about the relationship between the disposal system design and performance early in the disposal system project cycle. The calculations in this performance assessment show that the disposal of the low-level fraction can meet environmental and health performance objectives

  12. Hanford low-level tank waste interim performance assessment

    Energy Technology Data Exchange (ETDEWEB)

    Mann, F.M.

    1996-09-16

    The Hanford Low-Level Tank Waste Interim Performance Assessment examines the long-term environmental and human health effects associated with the disposal of the low-level fraction of the Hanford single- and double-shell tank waste in the Hanford Site 200 East Area. This report was prepared as a good management practice to provide needed information about the relationship between the disposal system design and its performance as early as possible in the project cycle. The calculations in this performance assessment show that the disposal of the low-level fraction can meet environmental and health performance objectives.

  13. Online thesis guidance management information system

    Science.gov (United States)

    Nasution, T. H.; Pratama, F.; Tanjung, K.; Siregar, I.; Amalia, A.

    2018-03-01

    The development of internet technology in education is still not maximized, especially in the process of thesis guidance between students and lecturers. Difficulties met the lecturers to help students during thesis guidance is the limited communication time and the compatibility of schedule between students and lecturer. To solve this problem, we designed an online thesis guidance management information system that helps students and lecturers to do thesis tutoring process anytime, anywhere. The system consists of a web-based admin app for usage management and an android-based app for students and lecturers.

  14. Fast Flux Test Facility interim examination and maintenance cell: Past, present, and future

    International Nuclear Information System (INIS)

    Vincent, J.R.

    1990-09-01

    The Fast Flux Test Facility Interim Examination and Maintenance Cell was designed to perform interim examination and/or disassembly of experimental core components for final analysis elsewhere, as well as maintenance of sodium-wetted or neutron-activated internal reactor parts and plant support hardware. The Interim Examination and Maintenance Cell equipment developed and used for the first ten years of operation has been primarily devoted to the disassembly and examination of core component test assemblies. While no major reactor equipment has required remote repair or maintenance, the Interim Examina Examination and Maintenance Cell has served as the remote repair facility for its own in-cell equipment, and several innovative remote repairs have been accomplished. The Interim Examination and Maintenance Cell's demonstrated versatility has shown its capability to support a challenging future. 12 refs., 9 figs

  15. International guidance, evolution and trends

    International Nuclear Information System (INIS)

    Ruiz Lopez, C.

    2010-01-01

    Carmen Ruiz Lopez, (CSN) addressed the evolution of some of the fundamental concepts related to the objective of protecting future generations, with the intention of encouraging the discussion, and to determine whether the recent international guidance implied any change in philosophy and approach regarding the practical interpretation and implementation of such fundamental concepts. C. Ruiz presented a general overview of the ICRP and IAEA guidance developments as well as the major changes or reorientations introduced by the latest ICRP Recommendations and IAEA Safety Standards that are relevant to long-term issues of geological disposal, namely, ICRP 103 (2009), ICRP 101 (2006), IAEA Safety Fundamentals SF-1(2006) and WS-R-4. As for the ICRP developments, ICRP 103 confirms the validity of ICRP 81(1998) as the main ICRP reference for long-lived waste disposal. C. Ruiz then noted the extension of the scope of ICPR 81 mentioning some of the principles and recommendations related to the objective of protecting future generations and the view of the Commission for demonstrating compliance. ICRP 103 and ICRP 101 reinforce the importance of transparency in the decision-making process and in the demonstration of confidence in situations of increasing uncertainties about time, giving more weight to the process itself and strengthening the need for an open dialogue between regulator and implementer. In both recommendations the Commission recognises the influence of societal values in the final decision on the level of radiological protection, as well as the influence of social concerns and political aspects in the decision-making process. The evolution of internationally agreed safety fundamental objectives and principles can be observed in the changes from the IAEA's Waste Safety Fundamentals of 1995 to the new Safety Fundamentals of 2006. C Ruiz presented a comparison of both documents focussing on the differences in dealing with fundamental concepts related to the

  16. Vacuum mammotomy under ultrasound guidance

    International Nuclear Information System (INIS)

    Luczynska, E.; Kocurek, A.; Pawlik, T.; Aniol, J.; Herman, K.; Skotnicki, P.

    2007-01-01

    Breast ultrasound is a non-invasive method of breast examination. You can use it also for fine needle biopsy, core needle biopsy, vacuum mammotomy and for placing the '' wire '' before open surgical biopsy. 106 patients (105 women and 1 man) aged 20-71 years (mean age 46.9) were treated in Cancer Institute in Cracow by vacuum mammotomy under ultrasound guidance. The lesions found in ultrasonography were divided into three groups: benign lesions (BI RADS II), ambiguous lesions (BI RADS 0, III and IVa), and suspicious lesions (BI RADS IV B, IV C and V). Then lesions were qualified to vacuum mammotomy. According to USG, fibroadenoma or '' fibroadenoma-like '' lesions were found in 75 women, in 6 women complicated cysts, in 6 women cyst with dense fluid (to differentiate with FA), and in 19 patients undefined lesions. Fibroadenoma was confirmed in histopathology in 74% patients among patients with fibroadenoma or '' fibroadenoma-like '' lesions in ultrasound (in others also benign lesions were found). Among lesions undefined after ultrasound examination (total 27 patients) cancer was confirmed in 6 % (DCIS and IDC). In 6 patients with complicated cysts in ultrasound examination, histopathology confirmed fibroadenoma in 4 women, an intraductal lesion in 1 woman and inflamatory process in 1 woman. Also in 6 women with a dense cyst or fibroadenoma seen in ultrasound, histopathology confirmed fibroadenoma in 3 women and fibrosclerosis in 3 women. Any breast lesions undefined or suspicious after ultrasound examination should be verified. The method of verification or kind of operation of the whole lesion (vacuum mammotomy or '' wire '') depends on many factors, for example: lesion localization; lesion size; BI RADS category. (author)

  17. Guidance of magnetic space tug

    Science.gov (United States)

    Fabacher, Emilien; Lizy-Destrez, Stéphanie; Alazard, Daniel; Ankersen, Finn; Profizi, Alexandre

    2017-07-01

    Magnetic tugging of a target satellite without thrust capacity can be interesting in various contexts, as for example End-Of-Life management, or to complete launchers capabilities. The aim is to gradually modify the orbit of the target by constantly exerting on it a magnetic force. To do so, the chaser is assumed equipped with a steerable magnetic dipole, able to create both forces and torques on the magnetic torque rods carried by the target. The chaser is also supposed to carry electric thrusters, creating a continuous force which modifies the orbit of the whole formation composed of chaser and target. The relative motions of both satellites are derived, in order to assess the feasibility of such a concept. Relative configuration (attitudes and position) trajectories are derived, which are compliant with the dynamics, and enable the chaser to tug the target. Considering targets in Low Earth Orbit (LEO), the magnetic field of the Earth is taken into account, modeled by the International Geomagnetic Reference Field (IGRF). The position of the magnetic torque rod of the target may not be located at its center of mass. This lever-arm is taken into account in the dynamics. As for every Electro-Magnetic Formation Flight concept developed in the literature, satellites involved in magnetic tugging are constantly subjected to torques, created by the Earth magnetic field and by the magnetic fields created by the other satellites in the formation. In this study, the solution chosen to face this problem is to take into account the attitude equilibrium of the satellites early in the guidance phase, in order to avoid having to wave the dipole, as it is generally done. Promising results are presented for different types of orbit, showing that the concept could be feasible in many different scenarios.

  18. Interim PET-CT may predict PFS and OS in T-ALL/LBL adult patients.

    Science.gov (United States)

    Wang, Liang; Wang, Jing-Hua; Bi, Xi-Wen; Chen, Xiao-Qin; Lu, Yue; Xia, Zhong-Jun

    2017-11-17

    T lymphoblastic leukemia/lymphoma (T-ALL/LBL) is highly aggressive. Although intensive chemotherapies such as ALL-type regimens are commonly used, about half adult patients eventually relapse and die of T-ALL/LBL. Overwhelming evidences have confirmed that interim PET can predict survival outcomes and guide subsequent treatments in Hodgkin lymphoma. However, whether interim PET-CT can predict survival outcomes or not in T-ALL/LBL patients remains unclear. 47 adult patients of T-ALL/LBL were retrospectively reviewed. Interim PET-CT was done after induction therapy and evaluated according to the International Harmonization Project criteria. After induction therapy, interim PET-CT was positive in 19 patients (40.4%). After a median follow up time of 34 months, the 2-year and 3-year progression free survival (PFS) rate were 39% and 30%, respectively, and the 2-year and 3-year overall survival (OS) rate were 54% and 45%, respectively. Using Kaplan-Meier survival analysis, it was found that interim PET-CT positivity correlated with significantly inferior PFS and OS (2-year PFS rate for patients with positive or negative interim PET were 21.1% or 56.0%, respectively, p = 0.002; 2-year OS rate for patients with positive or negative interim PET were 31.6% or 63.7%, respectively, p = 0.010). However, there was no significant relationship between PFS, OS and bone marrow infiltration, lactate dehydrogenase level, and stages ( p > 0.05). Interim PET-CT may predict PFS and OS in adult patients of T-ALL/LBL, which needs to be validated in prospective clinical trials. The optimal criteria for interim PET-CT evaluation and risk-adapted treatment strategy determined by interim PET-CT should be investigated in future clinical practice.

  19. Review of SKB's interim report of SR-Can: SKI's and SSI's evaluation of SKB's up-dated methodology for safety assessment

    Energy Technology Data Exchange (ETDEWEB)

    Dverstorp, Bjoern; Moberg, Leif; Wiebert, Anders; Xu Shulan [Swedish Radiation Protection Authority, Stockholm (Sweden); Stroemberg, Bo; Kautsky, Fritz; Lilja, Christina; Simic, Eva; Sundstroem, Benny; Toverud, Oeivind [Swedish Nuclear Power Inspectorate, Stockholm (Sweden)

    2005-07-01

    This report presents the findings of a review of the Swedish Nuclear Fuel and Waste Management Co.'s (SKB) interim report of the safety assessment SR-Can (SKB TR 04-11), conducted by the Swedish Radiation Protection Authority (SSI) and the Swedish Nuclear Power Inspectorate (SKI). SKB's interim report describes and exemplifies the safety assessment methodology that SKB plans to use in the oncoming licence applications for an encapsulation plant and a final repository for spent nuclear fuel. The authorities' review takes into account the findings of an international peer review of SKB's interim report. The authorities conclude that SKB has improved its safety assessment methodology in several aspects compared to earlier safety reports. Among other things the authorities commend SKB for giving a comprehensive account of relevant regulations and guidance, and for the systematic approach to identification and documentation of features, events and processes that need to be considered in the safety assessment. However, the authorities also conclude that important parts of SKB's method need to be further developed before they are mature enough to be used as a basis for a license application. The authorities' overall assessment is summarised in chapter 8 of this report.

  20. Significant Guidance Issued by the Federal Transit Administration

    Data.gov (United States)

    Department of Transportation — A list of Significant Guidance documents, which include guidance document disseminated to regulated entities or the general public that may reasonably be anticipated...

  1. Significant Guidance Issued by the Federal Highway Administration

    Data.gov (United States)

    Department of Transportation — A list of Significant Guidance documents, which include guidance document disseminated to regulated entities or the general public that may reasonably be anticipated...

  2. Significant Guidance Issued by the Federal Aviation Administration

    Data.gov (United States)

    Department of Transportation — A list of Significant Guidance documents, which include guidance document disseminated to regulated entities or the general public that may reasonably be anticipated...

  3. Significant Guidance Issued by the Federal Motor Carrier Safety Administration

    Data.gov (United States)

    Department of Transportation — A list of Significant Guidance documents, which include guidance document disseminated to regulated entities or the general public that may reasonably be anticipated...

  4. Moisture Control Guidance for Commercial and Public ...

    Science.gov (United States)

    This document provides guidance to designers, construction mangers, and building operation/maintenance managers to improve IEQ and reduce risks of encountering IEQ problems due to insufficient moisture control. EPA will be producing a document entitled

  5. RCRA Programmatic Information Policy and Guidance

    Data.gov (United States)

    U.S. Environmental Protection Agency — This asset includes program policy and guidance documents that are used by the EPA regions, states, tribes and private parties to implement the hazardous waste...

  6. Smartphone Video Guidance Sensor for Small Satellites

    Data.gov (United States)

    National Aeronautics and Space Administration — Smartphone Video Guidance Sensor(SVGS) for Small Satellites will provide a low-cost,integrated rendezvous & proximity operations sensor system to allow an...

  7. European Union Sustainable Purchasing Guidance Profile

    Science.gov (United States)

    To help you find the resource that is right for your organization, EPA conducted a scan of the landscape and developed summary profiles of some of the leading sources of sustainable purchasing guidance around the globe.

  8. Responsible Purchasing Network - Sustainable Purchasing Guidance Profile

    Science.gov (United States)

    To help you find the resource that is right for your organization, EPA conducted a scan of the landscape and developed summary profiles of some of the leading sources of sustainable purchasing guidance around the globe.

  9. Construction machine control guidance implementation strategy.

    Science.gov (United States)

    2010-07-01

    Machine Controlled Guidance (MCG) technology may be used in roadway and bridge construction to improve construction efficiencies, potentially resulting in reduced project costs and accelerated schedules. The technology utilizes a Global Positioning S...

  10. Guidance for the national healthcare disparities report

    National Research Council Canada - National Science Library

    Swift, Elaine K

    2002-01-01

    The Agency for Healthcare Research Quality commissioned the Institute of Medicine establish a committee to provide guidance on the National Healthcare Disparities Report is of access to health care...

  11. Optimal guidance for the space shuttle transition

    Science.gov (United States)

    Stengel, R. F.

    1972-01-01

    A guidance method for the space shuttle's transition from hypersonic entry to subsonic cruising flight is presented. The method evolves from a numerical trajectory optimization technique in which kinetic energy and total energy (per unit weight) replace velocity and time in the dynamic equations. This allows the open end-time problem to be transformed to one of fixed terminal energy. In its ultimate form, E-Guidance obtains energy balance (including dynamic-pressure-rate damping) and path length control by angle-of-attack modulation and cross-range control by roll angle modulation. The guidance functions also form the basis for a pilot display of instantaneous maneuver limits and destination. Numerical results illustrate the E-Guidance concept and the optimal trajectories on which it is based.

  12. Marriage guidance counselling in a group practice.

    Science.gov (United States)

    Marsh, G N; Barr, J

    1975-01-01

    This paper describes the work of a marriage guidance cousellor in a group-practice centre. The considerable advantages to patient, doctor, and counsellor of her close association with the primary medical care team are discussed.

  13. Surface Water Treatment Rules State Implementation Guidance

    Science.gov (United States)

    These documents provide guidance to states, tribes and U.S. EPA Regions exercising primary enforcement responsibility under the Safe Drinking Water Act. The documents contain EPA’s recommendations for implementation of the Surface Water Treatment Rules.

  14. A New Approach to Lane Guidance Systems

    OpenAIRE

    Eidehall, Andreas; Pohl, Jochen; Gustafsson, Fredrik

    2005-01-01

    This paper presents a new automotive safety function called Emergency Lane Assist (ELA). ELA combines conventional lane guidance systems with a threat assessment module that tries to activate and deactivate the lane guidance interventions according to the actual risk level of lane departure. The goal is to only prevent dangerous lane departure manoeuvres. Such a threat assessment algorithm is dependent on detailed information about the vehicle surroundings, i.e., positions and motion of other...

  15. UV DISINFECTION GUIDANCE MANUAL FOR THE ...

    Science.gov (United States)

    Provides technical information on selection, design and operation of UV systems; provides regulatory agencies with guidance and the necessary tools to assess UV systems at the design, start-up, and routine operation phase; provides manufacturers with the testing and performance standards for UV components and systems for treating drinking water. Provide guidance to water systems, regulators and manufacturers on UV disinfection of drinking water.

  16. Advantages on dry interim storage for spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    Romanato, L.S. [Centro Tecnologico da Marinha em Sao Paulo, Av. Professor Lineu Prestes 2468, 05508-900 Sao Paulo (Brazil); Rzyski, B.M. [IPEN/ CNEN-SP, 05508-000 Sao Paulo (Brazil)]. e-mail: romanato@ctmsp.mar.mil.br

    2006-07-01

    When the nuclear fuel lose its ability to efficiently create energy it is removed from the core reactor and moved to a storage unit waiting for a final destination. Generally, the spent nuclear fuel (SNF) remains inside concrete basins with water within the reactors facility for the radioactive activity decay. Water cools the generated heat and shields radioactivity emissions. After some period of time in water basins the SNF can be sent to a definitive deposition in a geological repository and handled as radioactive waste or to reprocessing installations, or still wait for a future solution. Meanwhile, SNF remains stored for a period of time in dry or wet installations, depending on the method adopted by the nuclear power plant or other plans of the country. In many SNF wet storage sites the capacity can be fulfilled very quickly. If so, additional area or other alternative storage system should be given. There are many options to provide capacity increase in the wet storage area, but dry storages are worldwide preferred since it reduces corrosion concerns. In the wet storage the temperature and water purity should be constantly controlled whereas in the dry storage the SNF stands protected in specially designed canisters. Dry interim storages are practical and approved in many countries especially that have the 'wait and see' philosophy (wait to see new technologies development). This paper shows the advantages of dry interim storages sites in comparison with the wet ones and the nowadays problems as terrorism. (Author)

  17. Nuclear waste: Is there a need for federal interim storage

    International Nuclear Information System (INIS)

    1989-01-01

    The Congress created the Monitored Retrievable Storage Review Commission to provide a report on the need for a Federal monitored retrievable storage facility (MRS) as part of the Nation's nuclear waste management system. The Commission concludes that the MRS as presently described in the law, which links the capacity and schedule of operation of the MRS to a permanent geologic repository, cannot be justified. The Commission finds, however, that while no single factor would favor an MRS over the No-MRS option, cumulatively the advantages of an MRS would justify the building of an MRS if: there were no linkages between the MRS and the repository; the MRS could be constructed at an early date; and the opening of the repository were delayed considerably beyond its presently scheduled date of operation. The Commission therefore recommends that the Congress take the following actions: Authorize construction of a Federal Emergency Storage facility with a capacity limit of 2,000 metric tons of uranium; Authorize construction of a User-Funded Interim Storage facility with a capacity limit of 5,000 metric tons of uranium; Reconsider the subject of interim storage by the year 2000

  18. Interim sanitary landfill groundwater monitoring report. 1996 Annual report

    International Nuclear Information System (INIS)

    Bagwell, L.A.

    1997-01-01

    Eight wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Interim Sanitary Landfill at the Savannah River Site. These wells are sampled semiannually to comply with the South Carolina Department of Health and Environmental Control Modified Municipal Solid Waste Permit 025500-1120 and as part of the SRS Groundwater Monitoring Program. Trichlorofluoromethane and 1,1,1-trichloroethane were elevated in one sidegradient well and one downgradient well during 1996. Zinc was elevated in three downgradient wells and also was detected in the associated laboratory blanks for two of those wells. Specific conductance was elevated in one background well and one sidegradient well. Barium and copper exceeded standards in one sidegradient well, and dichloromethane (a common laboratory contaminant) was elevated in another sidegradient well. Barium, copper, and dichloromethane were detected in the associated blanks for these wells, also. The groundwater flow direction in the Steed Pond Acquifer (Water Table) beneath the Interim Sanitary Landfill was to the southeast (universal transverse Mercator coordinates). The flow rate in this unit was approximately 210 ft/year during first quarter 1996 and 180 ft/yr during third quarter 1996

  19. Interim sanitary landfill groundwater monitoring report. 1996 Annual report

    Energy Technology Data Exchange (ETDEWEB)

    Bagwell, L.A.

    1997-01-01

    Eight wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Interim Sanitary Landfill at the Savannah River Site. These wells are sampled semiannually to comply with the South Carolina Department of Health and Environmental Control Modified Municipal Solid Waste Permit 025500-1120 and as part of the SRS Groundwater Monitoring Program. Trichlorofluoromethane and 1,1,1-trichloroethane were elevated in one sidegradient well and one downgradient well during 1996. Zinc was elevated in three downgradient wells and also was detected in the associated laboratory blanks for two of those wells. Specific conductance was elevated in one background well and one sidegradient well. Barium and copper exceeded standards in one sidegradient well, and dichloromethane (a common laboratory contaminant) was elevated in another sidegradient well. Barium, copper, and dichloromethane were detected in the associated blanks for these wells, also. The groundwater flow direction in the Steed Pond Acquifer (Water Table) beneath the Interim Sanitary Landfill was to the southeast (universal transverse Mercator coordinates). The flow rate in this unit was approximately 210 ft/year during first quarter 1996 and 180 ft/yr during third quarter 1996.

  20. Advantages on dry interim storage for spent nuclear fuel

    International Nuclear Information System (INIS)

    Romanato, L.S.; Rzyski, B.M.

    2006-01-01

    When the nuclear fuel lose its ability to efficiently create energy it is removed from the core reactor and moved to a storage unit waiting for a final destination. Generally, the spent nuclear fuel (SNF) remains inside concrete basins with water within the reactors facility for the radioactive activity decay. Water cools the generated heat and shields radioactivity emissions. After some period of time in water basins the SNF can be sent to a definitive deposition in a geological repository and handled as radioactive waste or to reprocessing installations, or still wait for a future solution. Meanwhile, SNF remains stored for a period of time in dry or wet installations, depending on the method adopted by the nuclear power plant or other plans of the country. In many SNF wet storage sites the capacity can be fulfilled very quickly. If so, additional area or other alternative storage system should be given. There are many options to provide capacity increase in the wet storage area, but dry storages are worldwide preferred since it reduces corrosion concerns. In the wet storage the temperature and water purity should be constantly controlled whereas in the dry storage the SNF stands protected in specially designed canisters. Dry interim storages are practical and approved in many countries especially that have the 'wait and see' philosophy (wait to see new technologies development). This paper shows the advantages of dry interim storages sites in comparison with the wet ones and the nowadays problems as terrorism. (Author)

  1. Glass packages in interim storage; Les verres dans les stockages

    Energy Technology Data Exchange (ETDEWEB)

    Jacquet-Francillon, N.

    1994-10-01

    This report summarize the current state of knowledge concerning the behavior of type C waste packages consisting of vitrified high-level solutions produced by reprocessing spent fuel. The composition and the physical and chemical properties of the feed solutions are reviewed, and the vitrification process is described. Sodium alumino-borosilicate glass compositions are generally employed - the glass used at la Hague for LWR fuel solutions, for example, contains 45 % SiO{sub 2}. The major physical, chemical, mechanical and thermal properties of the glass are reviewed. In order to allow their thermal power to diminish, the 3630 glass packages produced (as of January 1993) in the vitrification facilities at Marcoule and La Hague are placed in interim storage for several decades. The actual interim storage period has not been defined, as it is closely related to the concept and organization selected for the final destination of the packages: a geological repository. The glass behavior under irradiation is described. Considerable basic and applied research has been conducted to assess the aqueous leaching behavior of nuclear containment glass. The effects of various repository parameters (temperature, flow rate, nature of the environmental materials) have been investigated. The experimental findings have been used to specify a model describing the kinetics of aqueous corrosion of the glass. More generally all the ``source term`` models developed in France by the CEA or by ANDRA are summarized. (author). 152 refs., 33 figs.

  2. Safety of Long-term Interim Storage Facilities - Workshop Proceedings

    International Nuclear Information System (INIS)

    2014-01-01

    The objective of this workshop was to discuss and review current national activities, plans and regulatory approaches for the safety of long term interim storage facilities dedicated to spent nuclear fuel (SF), high level waste (HLW) and other radioactive materials with prolonged storage regimes. It was also intended to discuss results of experiments and to identify necessary R and D to confirm safety of fuel and cask during the long-term storage. Safety authorities and their Technical Support Organisation (TSO), Fuel Cycle Facilities (FCF) operating organisations and international organisations were invited to share information on their approaches, practices and current developments. The workshop was organised in an opening session, three technical sessions, and a conclusion session. The technical sessions were focused on: - National approaches for long term interim storage facilities; - Safety requirements, regulatory framework and implementation issues; - Technical issues and operational experience, needs for R and D. Each session consisted of a number of presentations followed by a panel discussion moderated by the session Chairs. A summary of each session and subsequent discussion that ensued are provided as well as a summary of the results of the workshop with the text of the papers given and presentations made

  3. Climate change : we are at risk : interim report

    Energy Technology Data Exchange (ETDEWEB)

    Oliver, D.; Wiebe, J.

    2003-06-01

    Between November 2002 and May 2003 the Standing Senate Committee on Agriculture and Forestry travelled across Canada to hear the views of farmer organizations, rural associations, ecotourism groups and environmental organizations regarding concerns about climate change and the impact it may have on the agriculture and forestry sectors and rural communities. The Committee also examined potential adaptation strategies focusing on primary production, practices, technologies, ecosystems and other related areas. Farmers and forest operators are already facing changes in market conditions, domestic regulations, trade policies and technology. This interim report expressed the concerns of farmers and forest operators. It includes a review of the Saguenay flood of 1996, the Red River flood of 1997, the ice storm of 1998, and droughts since 1999. It also includes a discussion on climate change and its biophysical and economic effects on agriculture, forestry, water resources, rural communities, and Aboriginal communities. This interim report also briefly outlines the Kyoto Protocol, the emissions trading system, and the decarbonization of global energy systems. It emphasized the need for integrated research and government policies and programs that encourage adaptation to climate change. The final report will be released in October 2003 and will provide specific recommendations to ensure that Canada responds to the concerns of farmers and forest operators and to ensure continued prosperity in these sectors. refs., figs.

  4. Candida albicans colonization of surface-sealed interim soft liners.

    Science.gov (United States)

    Olan-Rodriguez, L; Minah, G E; Driscoll, C F

    2000-12-01

    This in-vivo investigation evaluated the effect of 2 denture sealer agents on the microbial colonization of a newly placed soft interim denture liner during a period of 14 days. An interim soft denture liner (Coe-Soft; GC America, Alsip, IL) was coated with 2 different denture surface sealants (Palaseal [Heraeus Kulzer, Irvine, CA] and Mono-Poly [Plastodent, New York, NY]). Three rectangular wells of 1 cm wide x 2 cm long x 2 mm deep were placed in the intaglio of 10 maxillary complete dentures and filled with the soft liner material. The soft liner surface was treated with Palaseal (first well) and Mono-Poly (second well), and the unsealed (third well) was used as a control. These were exposed to the oral cavity for 14 days. The effect the sealant had in the prevention of Candidal colonization in vivo of the soft liner material was evaluated. Microbiological specimens were recovered from all samples and cultivated. Microbiological data from the control and 2-test samples in each denture were tabulated, and statistical analyses were performed. This investigation showed clear differences (p denture liner with either Palaseal or Mono-Poly significantly decreased yeast and bacterial colonization. . Copyright 2000 by The American College of Prosthodontists.

  5. Interim FEP report for the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Skagius, Kristina

    2004-08-01

    This report describes the work with identification and structuring of features, events and processes (FEPs) that has been carried out within the scope of the SR-Can safety assessment up to the time of the interim reporting of the project. The overall objective of the work is to develop a database of features, events and processes in a format that would facilitate both a systematic analysis of FEPs and documentation of the FEP analysis as well as facilitate revisions and updates to be made in connection with new safety assessments. This overall objective also includes the development of procedures for a systematic FEP analysis as well as to apply these procedures in order to arrive at an SR-Can version of the FEP database. The work started by implementing the content of the SR 97 Process report into a database format suitable for import and processing of FEP information from other sources. The SR 97 version of the database was systematically audited against the NEA database with Project FEPs, version 1.2. In addition, an earlier audit of the SR 97 process report against the interaction matrices developed for a deep repository of the KBS-3 type was revisited and updated. Relevant FEPs from the audit were sorted into three main categories in the SR-Can database i) FEPs related to the initial states of the repository system, ii) FEPs related to internal processes of the repository system, and iii) FEPs related to external impacts on the repository system. These groups of FEPs were further processed for making decisions on how to handle these FEPs in the assessment. Biosphere processes were not included in the SR 97 Process report and there is thus not the same basis for updating these descriptions as for the engineered barriers and the geosphere. All biosphere FEPs from the audit have therefore been compiled in a single category in the database, but remain to be further handled. FEPs were also categorised as irrelevant or as being related to methodology on a general

  6. General RMP Guidance - Appendix E: Supplemental Risk Management Program Guidance for Ammonia Refrigeration Facilities

    Science.gov (United States)

    Additional information for food processors, food distributors, refrigerated warehouses, and any other facility with ammonia refrigeration system. Includes guidance on exemptions, threshold quantity, offsite consequence analysis.

  7. The interim test effect: testing prior material can facilitate the learning of new material.

    Science.gov (United States)

    Wissman, Kathryn T; Rawson, Katherine A; Pyc, Mary A

    2011-12-01

    A wealth of prior research has shown that testing can improve subsequent learning of the initially tested material. In contrast, only one recent study has shown that an interim test over prior material can improve learning of subsequent new material (i.e., an interim-test effect). Five experiments replicated and extended this initial work by exploring the extent to which interim test effects generalize to complex text material. Participants were prompted to recall each section of an expository text before moving on to study the next section, or were only prompted to recall after the final section. In all experiments, recall of the final, target section was greater when prior sections had received interim tests versus no interim tests. Experiment 3 established that the effect was due to interim testing in particular rather than to intervening activity in general. Experiment 4 established that the effect was not due to test expectancy differences. In contrast to prior research, Experiment 4 also provided evidence that the effect is not due to release from proactive interference. We discuss other possible mechanisms underlying interim-test effects with text, including shifting to more effective encoding strategies.

  8. Guidance and Counselling in the Universal Basic Education ...

    African Journals Online (AJOL)

    Quite a number of personnel has significant and diverse roles to play. The guidance counsellor whose role is to provide indispensable guidance services is the primary focus of this paper. The paper justifies the relevance of guidance services to the UBE scheme and also isolates a number of challenges facing the guidance ...

  9. The voice of users in adult career guidance

    DEFF Research Database (Denmark)

    Plant, Peter

    2012-01-01

    Is the voice of users heard in adult career guidance? Pan-Nordic Research shows that users are seen as recipients rather than agents i adult career guidance.......Is the voice of users heard in adult career guidance? Pan-Nordic Research shows that users are seen as recipients rather than agents i adult career guidance....

  10. Constituent aspects of workplace guidance in secondary VET

    NARCIS (Netherlands)

    Swager, Robert; Klarus, Ruud; Van Merriënboer, Jeroen; Nieuwenhuis, Loek

    2018-01-01

    Purpose – This paper aims to present an integrated model of workplace guidance to enhance awareness of what constitutes good guidance, to improve workplace guidance practices in vocational education and training. Design/methodology/approach – To identify constituent aspects of workplace guidance,

  11. Constituent Aspects of Workplace Guidance in Secondary VET

    Science.gov (United States)

    Swager, Robert; Klarus, Ruud; van Merriënboer, Jeroen J. G.; Nieuwenhuis, Loek F. M.

    2015-01-01

    Purpose: This paper aims to present an integrated model of workplace guidance to enhance awareness of what constitutes good guidance, to improve workplace guidance practices in vocational education and training. Design/methodology/approach: To identify constituent aspects of workplace guidance, a systematic search of Web of Science was conducted,…

  12. The Development of a Lifelong Guidance System in Hungary

    Science.gov (United States)

    Watts, A. G.; Borbely-Pecze, Bors Tibor

    2011-01-01

    The development of a lifelong guidance system in Hungary Systematic work is currently being undertaken in Hungary to develop a lifelong guidance system, in line with principles outlined by leading international organisations. The origins of career guidance in Hungary, and the nature of the current career guidance system, are outlined. The main…

  13. Non-Participation in Guidance: An Opportunity for Development?

    Science.gov (United States)

    Thomsen, Rie

    2014-01-01

    This article discusses how new opportunities for guidance can emerge from an analysis of the interplay between the participation (or lack of participation) of the individuals in career guidance, and the career guidance practitioner's response. The article suggests critical psychology as a framework for career guidance research and presents…

  14. A conservative method of retaining an interim obturator for a total maxillectomy patient

    Directory of Open Access Journals (Sweden)

    Nirmal Famila Bettie

    2017-01-01

    Full Text Available Interim obturators are indicated during the postsurgical phases. It promotes surgical healing and serves as a temporary prosthesis to rehabilitate a patient with intra-oral surgical defect. Retention is gained by wiring, surgical suturing, and other noninvasive methods to enable functional rehabilitation and easy replacement with a permanent obturator. Interim obturators serve as an easy guide for replacing with definitive obturators by indicating prosthesis extensions and the required method of retention. A more conservative and noninvasive method of retaining an interim obturator for a maxillectomy patient is described in this case report.

  15. Project management plan for Reactor 105-C Interim Safe Storage project

    International Nuclear Information System (INIS)

    Plagge, H.A.

    1996-09-01

    Reactor 105-C (located on the Hanford Site in Richland, Washington) will be placed into an interim safe storage condition such that (1) interim inspection can be limited to a 5-year frequency; (2) containment ensures that releases to the environmental are not credible under design basis conditions; and (3) final safe storage configuration shall not preclude or significantly increase the cost for any decommissioning alternatives for the reactor assembly.This project management plan establishes plans, organizational responsibilities, control systems, and procedures for managing the execution of Reactor 105-C interim safe storage activities to meet programmatic requirements within authorized funding and approved schedules

  16. Launch flexibility using NLP guidance and remote wind sensing

    Science.gov (United States)

    Cramer, Evin J.; Bradt, Jerre E.; Hardtla, John W.

    1990-01-01

    This paper examines the use of lidar wind measurements in the implementation of a guidance strategy for a nonlinear programming (NLP) launch guidance algorithm. The NLP algorithm uses B-spline command function representation for flexibility in the design of the guidance steering commands. Using this algorithm, the guidance system solves a two-point boundary value problem at each guidance update. The specification of different boundary value problems at each guidance update provides flexibility that can be used in the design of the guidance strategy. The algorithm can use lidar wind measurements for on pad guidance retargeting and for load limiting guidance steering commands. Examples presented in the paper use simulated wind updates to correct wind induced final orbit errors and to adjust the guidance steering commands to limit the product of the dynamic pressure and angle-of-attack for launch vehicle load alleviation.

  17. Raising the Profile of Career Guidance: Educational and Vocational Guidance Practitioner

    Science.gov (United States)

    Hiebert, Bryan

    2009-01-01

    In 2007 the International Association for Educational and Vocational Guidance (IAEVG) launched the Educational and Vocational Guidance Practitioner credential (EVGP) as one means of formally acknowledging the knowledge, skills, and personal attributes that practitioners need in order to provide quality career development services to clients. This…

  18. Safety of magnetic fusion facilities: Guidance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    This document provides guidance for the implementation of the requirements identified in DOE-STD-6002-96, Safety of Magnetic Fusion Facilities: Requirements. This guidance is intended for the managers, designers, operators, and other personnel with safety responsibilities for facilities designated as magnetic fusion facilities. While the requirements in DOE-STD-6002-96 are generally applicable to a wide range of fusion facilities, this Standard, DOE-STD-6003-96, is concerned mainly with the implementation of those requirements in large facilities such as the International Thermonuclear Experimental Reactor (ITER). Using a risk-based prioritization, the concepts presented here may also be applied to other magnetic fusion facilities. This Standard is oriented toward regulation in the Department of Energy (DOE) environment as opposed to regulation by other regulatory agencies. As the need for guidance involving other types of fusion facilities or other regulatory environments emerges, additional guidance volumes should be prepared. The concepts, processes, and recommendations set forth here are for guidance only. They will contribute to safety at magnetic fusion facilities.

  19. Safety of magnetic fusion facilities: Guidance

    International Nuclear Information System (INIS)

    1996-05-01

    This document provides guidance for the implementation of the requirements identified in DOE-STD-6002-96, Safety of Magnetic Fusion Facilities: Requirements. This guidance is intended for the managers, designers, operators, and other personnel with safety responsibilities for facilities designated as magnetic fusion facilities. While the requirements in DOE-STD-6002-96 are generally applicable to a wide range of fusion facilities, this Standard, DOE-STD-6003-96, is concerned mainly with the implementation of those requirements in large facilities such as the International Thermonuclear Experimental Reactor (ITER). Using a risk-based prioritization, the concepts presented here may also be applied to other magnetic fusion facilities. This Standard is oriented toward regulation in the Department of Energy (DOE) environment as opposed to regulation by other regulatory agencies. As the need for guidance involving other types of fusion facilities or other regulatory environments emerges, additional guidance volumes should be prepared. The concepts, processes, and recommendations set forth here are for guidance only. They will contribute to safety at magnetic fusion facilities

  20. Constrained reconstructions for 4D intervention guidance

    International Nuclear Information System (INIS)

    Kuntz, J; Flach, B; Kueres, R; Semmler, W; Kachelrieß, M; Bartling, S

    2013-01-01

    Image-guided interventions are an increasingly important part of clinical minimally invasive procedures. However, up to now they cannot be performed under 4D (3D + time) guidance due to the exceedingly high x-ray dose. In this work we investigate the applicability of compressed sensing reconstructions for highly undersampled CT datasets combined with the incorporation of prior images in order to yield low dose 4D intervention guidance. We present a new reconstruction scheme prior image dynamic interventional CT (PrIDICT) that accounts for specific image features in intervention guidance and compare it to PICCS and ASD-POCS. The optimal parameters for the dose per projection and the numbers of projections per reconstruction are determined in phantom simulations and measurements. In vivo experiments in six pigs are performed in a cone-beam CT; measured doses are compared to current gold-standard intervention guidance represented by a clinical fluoroscopy system. Phantom studies show maximum image quality for identical overall doses in the range of 14 to 21 projections per reconstruction. In vivo studies reveal that interventional materials can be followed in 4D visualization and that PrIDICT, compared to PICCS and ASD-POCS, shows superior reconstruction results and fewer artifacts in the periphery with dose in the order of biplane fluoroscopy. These results suggest that 4D intervention guidance can be realized with today’s flat detector and gantry systems using the herein presented reconstruction scheme. (paper)

  1. 76 FR 29251 - Guidance for Industry and Food and Drug Administration Staff; Class II Special Controls; Guidance...

    Science.gov (United States)

    2011-05-20

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2006-D-0094] Guidance for Industry and Food and Drug Administration Staff; Class II Special Controls; Guidance Document... of the guidance entitled ``Guidance for Industry and Food and Drug Administration Staff; Class II...

  2. 75 FR 69089 - Guidance for Industry and Food and Drug Administration Staff; Class II Special Controls Guidance...

    Science.gov (United States)

    2010-11-10

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-D-0514] Guidance for Industry and Food and Drug Administration Staff; Class II Special Controls Guidance Document... Administration (FDA) is announcing the availability of the guidance entitled ``Class II Special Controls Guidance...

  3. Measuring Integrated Socioemotional Guidance at School: Factor Structure and Reliability of the Socioemotional Guidance Questionnaire (SEG-Q)

    Science.gov (United States)

    Jacobs, Karen; Struyf, Elke

    2013-01-01

    Socioemotional guidance of students has recently become an integral part of education, however no instrument exists to measure integrated socioemotional guidance. This study therefore examines the factor structure and reliability of the Socioemotional Guidance Questionnaire. Psychometric properties of the Socioemotional Guidance Questionnaire and…

  4. Guidance and control, 1993; Annual Rocky Mountain Guidance and Control Conference, 16th, Keystone, CO, Feb. 6-10, 1993

    Science.gov (United States)

    Culp, Robert D. (Editor); Bickley, George (Editor)

    1993-01-01

    Papers from the sixteenth annual American Astronautical Society Rocky Mountain Guidance and Control Conference are presented. The topics covered include the following: advances in guidance, navigation, and control; control system videos; guidance, navigation and control embedded flight control systems; recent experiences; guidance and control storyboard displays; and applications of modern control, featuring the Hubble Space Telescope (HST) performance enhancement study.

  5. Automated low-thrust guidance for the orbital maneuvering vehicle

    Science.gov (United States)

    Rose, Richard E.; Schmeichel, Harry; Shortwell, Charles P.; Werner, Ronald A.

    1988-01-01

    This paper describes the highly autonomous OMV Guidance Navigation and Control system. Emphasis is placed on a key feature of the design, the low thrust guidance algorithm. The two guidance modes, orbit change guidance and rendezvous guidance, are discussed in detail. It is shown how OMV will automatically transfer from its initial orbit to an arbitrary target orbit and reach a specified rendezvous position relative to the target vehicle.

  6. Interim report - geotechnical site assessment methodology. Vol.1

    International Nuclear Information System (INIS)

    Tunbridge, L.W.; Richards, L.R.

    1983-05-01

    An interim report summarizing the research conducted on geotechnical site assessment methodology at the Carwynnen test mine in Cornwall. The geological setting of the test site in the Cornubian granite batholith is described. The effect of structure imposed by discontinuities on the engineering behaviour of rock masses is discussed and the scanline survey method of obtaining data on discontinuities in the rock mass is described. The requirement for remote geophysical methods of characterizing the mass is discussed and initial experiments using seismic and ultrasonic velocity measurements are reported. Computer programs to perform statistical analysis of the discontinuity patterns are described. Overcoring and hydraulic fracturing methods of determining the in-situ stress are briefly described and the results of a programme of in-situ stress measurements using the overcoring method are reported. (author)

  7. Health Resources Priority and Allocations System (HRPAS). Interim final rule.

    Science.gov (United States)

    2015-07-17

    This interim final rule establishes standards and procedures by which the U.S. Department of Health and Human Services (HHS) may require that certain contracts or orders that promote the national defense be given priority over other contracts or orders. This rule also sets new standards and procedures by which HHS may allocate materials, services, and facilities to promote the national defense. This rule will implement HHS's administration of priorities and allocations actions, and establish the Health Resources Priorities and Allocation System (HRPAS). The HRPAS will cover health resources pursuant to the authority under Section 101(c) of the Defense Production Act as delegated to HHS by Executive Order 13603. Priorities authorities (and other authorities delegated to the Secretary in E.O. 13603, but not covered by this regulation) may be re-delegated by the Secretary. The Secretary retains the authority for allocations.

  8. Waste resources utilization program. Interim report, June 30, 1976

    International Nuclear Information System (INIS)

    1976-07-01

    This is an interim report on the effects of the combined use of heat and ionizing radiation (thermoradiation) as a treatment for ridding sewage sludge of pathogenic organisms as well as its effect on the physical-chemical properties. This activity couples two major environmental problems, disposition of human and of nuclear waste, in an attempt to provide a framework in which both will become useful resources. This combined treatment might be chosen to inactivate both heat labile (but possibly radiation resistant) and radiation labile (but possibly heat resistant) organisms. The cost-effective analyses of such a treatment are being examined. Sludge treated with thermoradiation offers considerable potential for use as a fertilizer in agriculture or a soil conditioner for land reclamation free of the potential health hazards associated with conventional methods of land disposal. Treated sludge may also provide a low-cost substitute for high-nutritional components in ruminant diets

  9. Modernization and refurbishment of the Central Interim Storage

    International Nuclear Information System (INIS)

    Mele, I.; Zeleznik, N.

    2002-01-01

    The Central Interim Storage for radioactive waste in Brinje, being put into operation in 1986, needs refurbishment and modernization in order to meet the up-to-date operational and safety requirements and to ensure the normal and undisturbed acceptance of radioactive waste from small producers in the future. Because of the waste, being already stored in the storage, the lack of reprocessing capacities and the lack of auxiliary room, the refurbishment and modernization is a complex problem, which needs to be addressed with care. The plan of refurbishment and modernization requires an integral approach, covering all different aspects of renewal and reconstruction. The implementation plan, however, must be based on the actual state of the storage and real conditions for the implementations: from technical to financial. In this paper the project for refurbishment and modernization of the storage, and some activities that have already been implemented, are presented.(author)

  10. COCON: Corrosion research programme for long term interim storage conditions

    International Nuclear Information System (INIS)

    Desgranges, C.; Mazaudier, F.; Gauvain, D.; Terlain, A.; Feron, D.; Santarini, G.

    2003-01-01

    Two main corrosion phenomena are encountered in long term interim storage conditions: dry oxidation by the air when the temperature of high level nuclear wastes containers is high enough (roughly higher than 100 deg. C) and corrosion phenomena as those encountered in outdoor atmospheric corrosion when the temperature of the container wall is low enough and so condensation is possible on the container walls. Results obtained with dry oxidation in air lead to predict small damages (less than 1 μm on steels over 100 years at 100 deg. C) and no drastic changes with pollutants. For atmospheric corrosion, the first developments of a pragmatic method that gives assessments of the indoor atmospheric corrosivities are reported. (authors)

  11. Model for low temperature oxidation during long term interim storage

    International Nuclear Information System (INIS)

    Desgranges, C.; Abbas, A.; Terlain, A.

    2003-01-01

    Low-alloyed steels or carbon steels are considered as candidate materials for the fabrication of some nuclear waste package containers for long term interim storage. The containers are required to remain retrievable for centuries. One factor limiting their performance on this time scale is corrosion. The estimation of the metal thickness lost by dry oxidation over such long periods requires the construction of reliable models from short-time experimental data. In a first step, models based on simplified oxidation theories have been derived from experimental data on iron and a low-alloy steel oxidation. Their extrapolation to long oxidation periods confirms that the expected damage due to dry oxidation could be small. In order to improve the reliability of these predictions advanced models taking into account the elementary processes involved in the whole oxidation mechanism, are under development. (authors)

  12. SNF Interim Storage Canister Corrosion and Surface Environment Investigations

    Energy Technology Data Exchange (ETDEWEB)

    Bryan, Charles R. [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States); Enos, David G. [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States)

    2015-09-01

    This progress report describes work being done at Sandia National Laboratories (SNL) to assess the localized corrosion performance of container/cask materials used in the interim storage of spent nuclear fuel (SNF). Of particular concern is stress corrosion cracking (SCC), by which a through-wall crack could potentially form in a canister outer wall over time intervals that are shorter than possible dry storage times. In order for SCC to occur, three criteria must be met. A corrosive environment must be present on the canister surface, the metal must susceptible to SCC, and sufficient tensile stress to support SCC must be present through the entire thickness of the canister wall. SNL is currently evaluating the potential for each of these criteria to be met.

  13. Corrosion behaviour of metallic containers during long term interim storages

    International Nuclear Information System (INIS)

    Desgranges, C.; Feron, D.; Mazaudier, F.; Terlain, A.

    2001-01-01

    Two main corrosion phenomena are encountered in long term interim storage conditions: dry oxidation by the air when the temperature of high level nuclear wastes containers is high enough (roughly higher than 100 C) and corrosion phenomena as those encountered in outdoor atmospheric corrosion when the temperature of the container wall is low enough and so condensation is possible on the container walls. Results obtained with dry oxidation in air lead to predict small damages (less than 1μm on steels over 100 years at 100 C) and no drastic changes with pollutants. For atmospheric corrosion, first developments deal with a pragmatic method that gives assessments of the indoor atmospheric corrosivities. (author)

  14. Advanced nuclear reactor public opinion project. Interim report

    Energy Technology Data Exchange (ETDEWEB)

    Benson, B.

    1991-07-25

    This Interim Report summarizes the findings of our first twenty in-depth interviews in the Advanced Nuclear Reactor Public Opinion Project. We interviewed 6 industry trade association officials, 3 industry attorneys, 6 environmentalists/nuclear critics, 3 state officials, and 3 independent analysts. In addition, we have had numerous shorter discussions with various individuals concerned about nuclear power. The report is organized into the four categories proposed at our April, 1991, Advisory Group meeting: safety, cost-benefit analysis, science education, and communications. Within each category, some change of focus from that of the Advisory Group has been required, to reflect the findings of our interviews. This report limits itself to describing our findings. An accompanying memo draws some tentative conclusions.

  15. Provisional materials: key components of interim fixed restorations.

    Science.gov (United States)

    Perry, Ronald D; Magnuson, Britta

    2012-01-01

    Clinicians have many choices of provisional materials from which to choose when fabricating interim fixed restorations. While traditional materials are still in use today, temporary materials are continuously being updated and improved upon. In addition to the functional necessities required of the provisional material, it must also provide esthetic value for the patient. This article provides an overview of provisional materials, including newer bis-acryls that have helped eliminate some of the challenges associated with traditional acrylic materials. Composite resin preformed crowns for single-unit provisional applications are also discussed, along with CAD/CAM-fabricated materials. Regardless of the material selected, a provisional restoration must maintain and protect the underlying tooth structure from ill effects.

  16. Developing new transportable storage casks for interim dry storage

    International Nuclear Information System (INIS)

    Hayashi, K.; Iwasa, K.; Araki, K.; Asano, R.

    2004-01-01

    Transportable storage metal casks are to be consistently used during transport and storage for AFR interim dry storage facilities planning in Japan. The casks are required to comply with the technical standards of regulations for both transport (hereinafter called ''transport regulation'') and storage (hereafter called ''storage regulation'') to maintain safety functions (heat transfer, containment, shielding and sub-critical control). In addition to these requirements, it is not planned in normal state to change the seal materials during storage at the storage facility, therefore it is requested to use same seal materials when the casks are transported after storage period. The dry transportable storage metal casks that satisfy the requirements have been developed to meet the needs of the dry storage facilities. The basic policy of this development is to utilize proven technology achieved from our design and fabrication experience, to carry out necessary verification for new designs and to realize a safe and rational design with higher capacity and efficient fabrication

  17. 1998 interim 242-A Evaporator tank system integrity assessment report

    Energy Technology Data Exchange (ETDEWEB)

    Jensen, C.E.

    1998-07-02

    This Integrity Assessment Report (IAR) is prepared by Fluor Daniel Northwest (FDNW) under contract to Lockheed-Martin Hanford Company (LMHC) for Waste Management Hanford (WMH), the 242-A Evaporator (facility) operations contractor for Fluor Daniel Hanford, and the US Department of Energy, the system owner. The contract specifies that FDNW perform an interim (5 year) integrity assessment of the facility and prepare a written IAR in accordance with Washington Administrative Code (WAC) 173-303-640. The WAC 173-303 defines a treatment, storage, or disposal (TSD) facility tank system as the ``dangerous waste storage or treatment tank and its ancillary equipment and containment.`` This integrity assessment evaluates the two tank systems at the facility: the evaporator vessel, C-A-1 (also called the vapor-liquid separator), and the condensate collection tank, TK-C-100. This IAR evaluates the 242-A facility tank systems up to, but not including, the last valve or flanged connection inside the facility perimeter. The initial integrity assessment performed on the facility evaluated certain subsystems not directly in contact with dangerous waste, such as the steam condensate and used raw water subsystems, to provide technical information. These subsystems were not evaluated in this IAR. The last major upgrade to the facility was project B-534. The facility modifications, as a result of project B-534, were evaluated in the 1993 facility interim integrity assessment. Since that time, the following upgrades have occurred in the facility: installation of a process condensate recycle system, and installation of a package steam boiler to provide steam for the facility. The package boiler is not within the scope of the facility TSD.

  18. The challenges facing the long term interim storage

    International Nuclear Information System (INIS)

    Iracane, D.; Marvy, A.

    2001-01-01

    In France electricity generation by means of commercial nuclear power plants has come to a point where it contributes to the national demand at a level of 80%. The safety performance of the production system has also reached a high level of both maturity and reliability taking advantage of the cumulative effect of a 30 years long learning experience and ever more stringent safety requirements. The policy to reprocess spent fuel has been overriding but no final decision has yet been made regarding the ultimate disposition of the waste streams. Although studies on deep geological disposal are ongoing, France is also looking at whether and under which conditions a long-term interim storage may provide an effective flexibility to the fuel cycle back-end. We discuss thereafter the needs and the paramount objectives of this latter R and D program. Results are being framed as potential guiding criteria for decision makers and various stakeholders. In first part, we propose a general analysis which emphasises that a long term interim storage is more than a classical nuclear facility because it explicitly requires long-lasting control and creates a burden for Society during many generations. Then, in second part, we offer an overview of the technical results from the R and D program as they stand at the time of writing. As an answer to the Government request, a strong emphasis has been put on this research for three years. Conclusion is an attempt to outline the societal context in which future decisions will have to be made. (author)

  19. ICPP radioactive liquid and calcine waste technologies evaluation. Interim report

    Energy Technology Data Exchange (ETDEWEB)

    Murphy, J.A.; Pincock, L.F.; Christiansen, I.N.

    1994-06-01

    The Department of Energy (DOE) has received spent nuclear fuel (SNF) at the Idaho Chemical Processing Plant (ICPP) for interim storage since 1951 and reprocessing since 1953. Until recently, the major activity of the ICPP has been the reprocessing of SNF to recover fissile uranium; however, changing world events have raised questions concerning the need to recover and recycle this material. In April 1992, DOE chose to discontinue reprocessing SNF for uranium recovery and shifted its focus toward the management and disposition of radioactive wastes accumulated through reprocessing activities. Currently, 1.8 million gallons of radioactive liquid wastes (1.5 million gallons of radioactive sodium-bearing liquid wastes and 0.3 million gallons of high-level liquid waste) and 3,800 cubic meters (m{sup 3}) of calcine waste are in inventory at the ICPP. Legal drivers and agreements exist obligating the INEL to develop, demonstrate, and implement technologies for safe and environmentally sound treatment and interim storage of radioactive liquid and calcine waste. Candidate treatment processes and waste forms are being evaluated using the Technology Evaluation and Analysis Methodology (TEAM) Model. This process allows decision makers to (1) identify optimum radioactive waste treatment and disposal form alternatives; (2) assess tradeoffs between various optimization criteria; (3) identify uncertainties in performance parameters; and (4) focus development efforts on options that best satisfy stakeholder concerns. The Systems Analysis technology evaluation presented in this document supports the DOE in selecting the most effective radioactive liquid and calcine waste management plan to implement in compliance with established regulations, court orders, and agreements.

  20. T Tank Farm Interim Cover Test - Design Plan

    International Nuclear Information System (INIS)

    Zhang, Z. F.; Keller, Jason M.

    2006-01-01

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank in 1973. Many of the contaminants from that leak still reside within the vadose zone beneath the T Tank Farm. CH2M Hill Hanford Group, Inc. seeks to minimize movement of this residual contaminant plume by placing an interim cover on the surface. Such a cover is expected to prevent infiltrating water from reaching the plume and moving it further. Pacific Northwest National Laboratory has prepared a design plan to monitor and determine the effectiveness of the interim cover. A three-dimensional numerical simulation of water movement beneath a cover was conducted to guide the design of the plan. Soil water content, water pressure, and temperature will be monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. In fiscal year 2006, two instrument nests will be installed, one inside and one outside of the proposed cover. In fiscal year 2007, two additional instrument nests, both inside the proposed cover, will be installed. Each instrument nest contains a neutron access tube and a capacitance probe (to measure water content), and four heat-dissipation units (to measure pressure head and temperature). A datalogger and a meteorological station will be installed outside of the fence. Two drain gauges will be installed in locations inside and outside the cover for the purpose of measuring soil water flux.

  1. Affective guidance in the Iowa gambling task.

    Science.gov (United States)

    Wagar, Brandon M; Dixon, Mike

    2006-12-01

    It has been suggested that affective states can guide higher level cognitive processes and that such affective guidance may be particularly important when real-life decisions are made under uncertainty. We ask whether affect guides decisions in a laboratory task that models real-life decisions under uncertainty. In the Iowa gambling task (IGT), participants search for monetary payoffs in an uncertain environment. Recent evidence against an affective guidance interpretation of the IGT indicates a need to set a standard for what counts as evidence of affective guidance. We present a novel analysis of IGT, and our results show that participants' galvanic skin response (GSR) reflects an affective process that precedes and guides cognition. Specifically, prior to participants' knowledge of the optimal strategy, their GSRs are significantly higher when they are about to select from a bad deck, relative to a good deck, and this difference in GSR is correlated with a behavioral preference for the good deck.

  2. HUMAN FACTORS GUIDANCE FOR CONTROL ROOM EVALUATION

    International Nuclear Information System (INIS)

    OHARA, J.; BROWN, W.; STUBLER, W.; HIGGINS, J.; WACHTEL, J.; PERSENSKY, J.J.

    2000-01-01

    The Human-System Interface Design Review Guideline (NUREG-0700, Revision 1) was developed by the US Nuclear Regulatory Commission (NRC) to provide human factors guidance as a basis for the review of advanced human-system interface technologies. The guidance consists of three components: design review procedures, human factors engineering guidelines, and a software application to provide design review support called the ''Design Review Guideline.'' Since it was published in June 1996, Rev. 1 to NUREG-0700 has been used successfully by NRC staff, contractors and nuclear industry organizations, as well as by interested organizations outside the nuclear industry. The NRC has committed to the periodic update and improvement of the guidance to ensure that it remains a state-of-the-art design evaluation tool in the face of emerging and rapidly changing technology. This paper addresses the current research to update of NUREG-0700 based on the substantial work that has taken place since the publication of Revision 1

  3. Approach trajectory guidance for maximum concealment

    Science.gov (United States)

    Warner, David N., Jr.

    1988-01-01

    An energy-management concept is examined with a view to provision of a near-optimum maneuver guidance system for military aircraft tactical operations. The data thus obtained indicate that the Quiet Short-Haul Research Aircraft, as modeled in the aircraft-specific energy-rate tables, could fly the flight paths in question. The fuel-conservative guidance system's ability to minimize pop-up flight time and carefully coordinate the aircraft's controls for this performance-oriented requirement is demonstrated.

  4. Safety evaluation of interim stabilization of non-stabilized single-shell watch list tanks

    Energy Technology Data Exchange (ETDEWEB)

    Stahl, S.M.

    1994-12-30

    The report provides a summation of the status of safety issues associated with interim stabilization of Watch List SSTs (organic, ferrocyanide, and flammable gas), as extracted from recent safety analyses, including the Tank Farms Accelerated Safety Analysis efforts.

  5. The use of robotics for nondestructive inspection of steel highway bridges and structures: interim report.

    Science.gov (United States)

    1998-01-01

    This interim report describes the progress during the first year of a project to develop robotics hardware for nondestructive evaluation of steel structures. The project objectives are to (1) develop and test an improved prototype (POLECAT-II) crawli...

  6. Sample results from the interim salt disposition program macrobatch 9 tank 21H qualification samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-11-01

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 9 for the Interim Salt Disposition Program (ISDP). This document reports characterization data on the samples of Tank 21H.

  7. Treatment Technology to Meet the Interim Primary Drinking Water Regulations for Inorganics: Part 3.

    Science.gov (United States)

    Sorg, Thomas J.; And Others

    1978-01-01

    This article is the third in a series summarizing existing treatment technology to meet the inorganic National Interim Primary Drinking Water Regulations. This report deals specifically with treatment methods for removing cadmium, lead, and silver from drinking water. (CS)

  8. DQO Summary Report for 105-N/109-N Interim Safe Storage Project Waste Characterization

    Energy Technology Data Exchange (ETDEWEB)

    T. A. Lee

    2005-09-15

    The DQO summary report provides the results of the DQO process completed for waste characterization activities for the 105-N/109-N Reactor Interim Safe Storage Project including decommission, deactivate, decontaminate, and demolish activities for six associated buildings.

  9. Interim revision of the South African Mechanistic-Empirical pavement design method for flexible pavements

    CSIR Research Space (South Africa)

    Theyse, HL

    2011-09-01

    Full Text Available an interim revision of the SAMDM recommending increased contact stress values at the tyre-pavement interface; updated unbound material characterisation parameters; effective stress analysis for unbound material; and revised damage models for estimating...

  10. DQO Summary Report for 105-N/109-N Interim Safe Storage Project Waste Characterization

    International Nuclear Information System (INIS)

    Lee, T.A.

    2005-01-01

    The DQO summary report provides the results of the DQO process completed for waste characterization activities for the 105-N/109-N Reactor Interim Safe Storage Project including decommission, deactivate, decontaminate, and demolish activities for six associated buildings.

  11. Interim Policy to Preserve Separated Personnel’s Electronically Stored Information Subject to Litigation Holds

    Science.gov (United States)

    This Interim Policy is designed to ensure the preservation of electronically stored information (ESI), created or received by EPA employees, contractors or grantees with user and email accounts on EPA networks, who have ended their employment with EPA.

  12. Safety evaluation of interim stabilization of non-stabilized single-shell watch list tanks

    International Nuclear Information System (INIS)

    Stahl, S.M.

    1994-01-01

    The report provides a summation of the status of safety issues associated with interim stabilization of Watch List SSTs (organic, ferrocyanide, and flammable gas), as extracted from recent safety analyses, including the Tank Farms Accelerated Safety Analysis efforts

  13. 78 FR 76160 - Public Housing Assessment System (PHAS) Capital Fund Interim Scoring Notice: Reinstitution of...

    Science.gov (United States)

    2013-12-16

    ... www.regulations.gov . FOR FURTHER INFORMATION CONTACT: Claudia J. Yarus, Real Estate Assessment Center... comment on this interim notice, and will consider all significant and relevant issues raised in issuing a...

  14. Basis for Interim Operation for the K-Reactor in Cold Standby

    Energy Technology Data Exchange (ETDEWEB)

    Shedrow, B.

    1998-10-19

    The Basis for Interim Operation (BIO) document for K Reactor in Cold Standby and the L- and P-Reactor Disassembly Basins was prepared in accordance with the draft DOE standard for BIO preparation (dated October 26, 1993).

  15. Comparison of interim restorations fabricated by CAD/CAM with those fabricated manually.

    Science.gov (United States)

    Rayyan, Mohammad M; Aboushelib, Moustafa; Sayed, Nagwa M; Ibrahim, Ahmed; Jimbo, Ryo

    2015-09-01

    Interim restorations represent an essential treatment step; however, the optimal resin material for long-term interim restorations requires investigation. The purpose of this in vitro study was to compare the color stability, water sorption, wear resistance, surface hardness, fracture resistance, and microleakage of computer-aided design/computer-aided manufacturing-(CAD/CAM) fabricated interim restorations with those of manually fabricated interim restorations. Epoxy replicas were made from a prepared maxillary first premolar. On the replicas, interim crowns were fabricated and divided into the following groups: CAD/CAM poly(methyl methacrylate) (PMMA) blocks (CC), autopolymerizing temporary resin (AP), automix temporary resin (AM), and thermoplastic resin (TP). After cementation, all specimens were subjected to thermocycling and dynamic fatigue. The CIE Laboratory color coordinates were then recorded before and after immersion in coffee, tea, carbonated cola, and red wine. Water sorption was evaluated by using an immersion technique. Wear resistance was measured in a surface abrasion device. Vickers microhardness was measured on polished specimens. Fracture resistance was evaluated by axial loading with a universal testing machine. Marginal dye penetration was evaluated by sectioning the interim restorations after immersion in methylene blue (α=.05). Colorimetric analysis revealed a large degree of color alteration (ΔE) in the manually fabricated interim restorations: AP = ΔE of 6.7 ±2); AM = ΔE of 7.1 ±1.5), and TP = ΔE of =5.4 ±3.1. The CC group demonstrated color stability (ΔE=2.1 ±0.2). CAD/CAM interim restorations demonstrated significantly lower water sorption, higher wear resistance, higher surface hardness, and significantly higher fracture resistance (1289±56N) compared with manually fabricated interim restorations (AP=996 ±45, AM=899 ±37, and TP=1179 ±41). The stereomicroscopic examination of sectioned specimens demonstrated the absence of

  16. Algorithm of trajectory guidance of a planning unmanned flight vehicle to a ground target providing the guidance in case the final conditions of guidance are given

    Directory of Open Access Journals (Sweden)

    О.Г. Водчиць

    2004-01-01

    Full Text Available  In the article are obtained the mathematical relations which allow to implement algorithm of trajectory guidance of a unmanned flight vehicle to a ground target providing the guidance in case the final conditions of guidance are given.

  17. Federal Administrative Court confirms interim action for the Kruemmel power plant site

    International Nuclear Information System (INIS)

    Anon.

    1982-01-01

    The interim action concerning the reactor site was confirmed in 1972, the action of voidance because of the possible injuriousness to health was rejected in the first instance. In the appeal OVG Lueneburg had sharpened three clauses concerning the contents of the restrictions and injunctions included in the interim action to the disadvantage of the operator. Responding to a new appeal the BVerwG has eliminated these restrictions and dismissed the following appeals of the plaintiffs. (HP) [de

  18. On-site interim storage of spent nuclear fuel: Emerging public issues

    International Nuclear Information System (INIS)

    Feldman, D.L.; Tennessee Univ., Knoxville, TN

    1992-01-01

    Failure to consummate plans for a permanent repository or above- ground interim Monitored Retrievable Storage (MRS) facility for spent nuclear fuel has spurred innovative efforts to ensure at-reactor storage in an environmentally safe and secure manner. This article examines the institutional and socioeconomic impacts of Dry Cask Storage Technology (DCST)-an approach to spent fuel management that is emerging as the preferred method of on-site interim spent fuel storage by utilities that exhaust existing storage capacity

  19. Acceptable TRU packaging for interim storage and/or terminal isolation: FY-1977 final report

    International Nuclear Information System (INIS)

    Doty, J.W.; Peterson, J.B.

    1978-01-01

    A program was conducted for the definition and demonstration of acceptable waste packages for defense transuranic waste for interim storage and terminal isolation. During FY-1977, a Contractor Questionnaire was used to gather pertinent data and to assess contractor concerns. This information was integrated into basic application data in the form of a checklist. Conceptual Container Design Specifications were developed by analyzing and evaluating the application data against Federal Regulations and interim/terminal storage constraints

  20. Will interim storage sites become ultimate storage sites?; Werden aus Zwischenlager Endlager?

    Energy Technology Data Exchange (ETDEWEB)

    Bauer, W.P. [ia GmbH - Wissensmanagement und Ingenieurleistungen, Muenchen (Germany)

    2007-07-01

    According to a Prognos study, the maximum interim storage capacity required in Germany in 2008 will be 4 - 5 million cubic metres. Interim storage is necessary because there are not sufficient options for disposal. The stored waste will be combusted, so that German incinerators will be capable of running at full capacity until 2013. From mere disposal systems, incinerators are rapidly becoming waste-to-energy systems that will make a contribution to power supply. (orig.)

  1. Final hazard classification and auditable safety analysis for the 105-C Reactor Interim Safe Storage Project

    International Nuclear Information System (INIS)

    Rodovsky, T.J.; Larson, A.R.; Dexheimer, D.

    1996-12-01

    This document summarizes the inventories of radioactive and hazardous materials present in the 105-C Reactor Facility and the operations associated with the Interim Safe Storage Project which includes decontamination and demolition and interim safe storage of the remaining facility. This document also establishes a final hazard classification and verifies that appropriate and adequate safety functions and controls are in place to reduce or mitigate the risk associated with those operations

  2. DATA MINING METHODOLOGY FOR DETERMINING THE OPTIMAL MODEL OF COST PREDICTION IN SHIP INTERIM PRODUCT ASSEMBLY

    Directory of Open Access Journals (Sweden)

    Damir Kolich

    2016-03-01

    Full Text Available In order to accurately predict costs of the thousands of interim products that are assembled in shipyards, it is necessary to use skilled engineers to develop detailed Gantt charts for each interim product separately which takes many hours. It is helpful to develop a prediction tool to estimate the cost of interim products accurately and quickly without the need for skilled engineers. This will drive down shipyard costs and improve competitiveness. Data mining is used extensively for developing prediction models in other industries. Since ships consist of thousands of interim products, it is logical to develop a data mining methodology for a shipyard or any other manufacturing industry where interim products are produced. The methodology involves analysis of existing interim products and data collection. Pre-processing and principal component analysis is done to make the data “user-friendly” for later prediction processing and the development of both accurate and robust models. The support vector machine is demonstrated as the better model when there are a lower number of tuples. However as the number of tuples is increased to over 10000, then the artificial neural network model is recommended.

  3. Contingency interim measure for the public water supply at Barnes, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2009-07-09

    This document presents a conceptual design for a contingency interim measure (IM) for treatment of the public water supply system at Barnes, Kansas, should this become necessary. The aquifer that serves the public water supply system at Barnes has been affected by trace to low concentrations of carbon tetrachloride and its degradation product, chloroform. Investigations conducted on behalf of the CCC/USDA by Argonne National Laboratory (Argonne 2008a) have demonstrated that groundwater at the Barnes site is contaminated with carbon tetrachloride at concentrations exceeding the Kansas Tier 2 risk-based screening level (RBSL) and the EPA maximum contaminant level (MCL) of 5.0 {micro}g/L for this compound. The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) formerly operated a grain storage facility in Barnes, approximately 800 ft east-southeast of the public water supply wells. Carbon tetrachloride was used in the treatment of grain. Another potential source identified in an investigation conducted for the KDHE (PRC 1996) is the site of a former agriculture building owned by the local school district (USD 223). This building is located immediately east of well PWS3. The potential contingency IM options evaluated in this report include the treatment of groundwater at the public water supply wellheads and the provision of an alternate water supply via Washington County Rural Water District No.2 (RWD 2). This document was developed in accordance with KDHE Bureau of Environmental Remediation (BER) Policy No.BER-RS-029 (Revised) (KDHE 2006a), supplemented by guidance from the KDHE project manager. Upon the approval of this contingency IM conceptual design by the KDHE, the CCC/USDA will prepare a treatment system design document that will contain the following elements: (1) Description of the approved contingency IM treatment method; (2) Drawings and/or schematics provided by the contractor and/or manufacturer of the approved technology; (3) A

  4. Guidance Program Evaluation: What's Out There?

    Science.gov (United States)

    Miller, Juliet V.; Grisdale, George A.

    1975-01-01

    This article reviews a number of guidance evaluation materials and programs presently in use in terms of Stufflebeam's CIPP model. Some materials were simple evaluation instruments; others were as comprehensive as process guides for the planning, development, and application of a complete systems approach evaluation. (Author)

  5. Cannabinoid receptor CB2 modulates axon guidance

    DEFF Research Database (Denmark)

    Duff, Gabriel; Argaw, Anteneh; Cecyre, Bruno

    2013-01-01

    Navigation of retinal projections towards their targets is regulated by guidance molecules and growth cone transduction mechanisms. Here, we present in vitro and in vivo evidences that the cannabinoid receptor 2 (CB2R) is expressed along the retino-thalamic pathway and exerts a modulatory action ...

  6. The Guidance Counselor and the Reading Curriculum.

    Science.gov (United States)

    Ediger, Marlow

    There are many ways guidance counselors can help teachers achieve more optimal reading instruction. Counselors first may have to ascertain the kinds of problems faced by a student in learning to read. Assessing a student's ability to use picture clues to decipher words may be necessary with primary grade students. Knowledge about phonics, using…

  7. attitude of secondary school students towards guidance

    African Journals Online (AJOL)

    Elizabeth Egbochuku

    violence among students, fuelled cultism, wrong career choice, and wrong subject combination among other issues. ... individuals, it is desirable that adequate guidance and counselling and career information be provided, .... Table 1 shows that the calculated t-value of 9.333 is greater than the table value of 1.960 i.e. 9.333 ...

  8. Applying Phenomenography in Guidance and Counselling Research

    Science.gov (United States)

    Kettunen, Jaana; Tynjälä, Päivi

    2018-01-01

    This paper examines phenomenography as a viable qualitative approach in guidance and counselling research. A phenomenographic study maps the qualitatively different ways in which people experience a specific phenomenon and helps researchers to describe the aspects that make one way of experiencing a certain phenomenon qualitatively distinct from…

  9. 48 CFR 27.102 - General guidance.

    Science.gov (United States)

    2010-10-01

    ... patent. The Government may authorize and consent to the use of inventions in the performance of certain contracts, even though the inventions may be covered by U.S. patents. (c) Generally, contractors providing... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false General guidance. 27.102...

  10. Suggestions for Guidance Centres for Secondary Schools.

    Science.gov (United States)

    Ontario Dept. of Education, Toronto. School Planning and Building Research Section.

    Facility requirements outlined include a location accessible to students and staff; specific furniture design for a guidance information center and counseling rooms; furniture for storing equipment and records; and how to avoid planning faults. Photographs are included of some of the furnishings, and sketches show building floor plans of guidance…

  11. 75 FR 76011 - Annual Guidance Agenda

    Science.gov (United States)

    2010-12-07

    ...), Controls Guidance (Edition 4). Food and Drug Administration, 5100 Paint Branch Pkwy., College Park, MD... Protection and Affordable Care Act on Administration, 5100 Paint State and Local Menu and Vending Branch Pkwy... for Animal Feeding. Veterinary Medicine (HFV-226), Food and Drug Administration, 7519 Standish Pl...

  12. Guidance for the national healthcare disparities report

    National Research Council Canada - National Science Library

    Swift, Elaine K

    2002-01-01

    ... on Guidance for Designing A National Healthcare Disparities Report INSTITUTE OF MEDICINE OF THE NATIONAL ACADEMIES THE NATIONAL ACADEMIES PRESS Washington, D.C. www.nap.edu i Copyrightthe cannot be not from book, paper however, version for formatting, original authoritative the typesetting-specific the as from created publication files XML from other th...

  13. Guidance for performing site inspections under CERCLA

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    This guidance presents EPA`s site inspection (SI) strategy. The strategy discusses procedural guidelines to investigate potential Superfund (CERCLA) sites for evaluation pursuant to the Hazard Ranking System (HRS), revised in accordance with the Superfund Amendments and Reauthorization Act of 1986. The HRS is the primary means by which EPA evaluates sites for superfund`s National Priorities List (NPL).

  14. Bridge over troubled water: Guidance crosses | Amundson ...

    African Journals Online (AJOL)

    This article is based on a keynote presentation at an international conference where the focus was cross-over career guidance. Simon and Garfunkel's popular song, "Bridge ... and the future, and building connections. There also was the suggestion that other metaphors could be used as a way to broaden the exploration.

  15. Guidance for conducting hazardous materials flow surveys

    Science.gov (United States)

    1995-01-01

    This report provides guidance on how to conduct a commodity flow study for hazardous materials moving by highway. It discusses the need for this type of study and details how to review baseline information and design the study. It includes examples a...

  16. 48 CFR 225.7302 - Guidance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Guidance. 225.7302 Section 225.7302 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Acquisitions for Foreign Military Sales 225.7302...

  17. 21 CFR 601.29 - Guidance documents.

    Science.gov (United States)

    2010-04-01

    ... Manufacturers Assistance (HFM-40), Center for Biologics Evaluation and Research, Food and Drug Administration... 21 Food and Drugs 7 2010-04-01 2010-04-01 false Guidance documents. 601.29 Section 601.29 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) BIOLOGICS...

  18. 21 CFR 312.145 - Guidance documents.

    Science.gov (United States)

    2010-04-01

    ... of Drug Information, Center for Drug Evaluation and Research, Food and Drug Administration, 10903 New... Evaluation and Research, Food and Drug Administration, 1401 Rockville Pike, Rockville, MD 20852-1448. [65 FR... 21 Food and Drugs 5 2010-04-01 2010-04-01 false Guidance documents. 312.145 Section 312.145 Food...

  19. Chinese Human Rights Guidance on Minerals Sourcing

    DEFF Research Database (Denmark)

    Buhmann, Karin

    2017-01-01

    in the minerals sector and due diligence to ensure socially responsible sourcing of minerals with a particular focus on human rights, the guidelines refer to international human rights standards and are designed to be consistent with guidance issued by the OECD. The article discusses the Chinese guidelines...

  20. 28 CFR 91.53 - Other guidance.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Other guidance. 91.53 Section 91.53 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) GRANTS FOR CORRECTIONAL FACILITIES Environmental... Justice has also published NEPA procedures that incorporate the CEQ regulations at 28 CFR part 61...

  1. Nigerian Journal of Guidance and Counselling

    African Journals Online (AJOL)

    The Nigerian Journal of Guidance and Counselling (TNJGC) (ISSN 0794-0831) is published annually by the Department of Counsellor Education, University of Ilorin, Ilorin, Nigeria. The journal publishes well researched and well articulated papers/articles on all issues relating to counselling and applied psychology which ...

  2. National Ignition Facility Cryogenic Target Systems Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize the National Ignition Facility (NIF) Cryogenic Target Handling Systems (NCTS) Program, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NCTS. Preparation of a Program Execution Plan (PEP) for NCTS has been initiated, and a current draft is provided as Attachment 1 to this document. The National Ignition Facility is a multi-megajoule laser facility being constructed at Lawrence Livermore National Laboratory (LLNL) by the National Nuclear Security Administration (NNSA) in the Department of Energy (DOE). Its primary mission is to support the Stockpile Stewardship Program (SSP) by performing experiments studying weapons physics, including fusion ignition. NIF also supports the missions of weapons effects, inertial fusion energy, and basic science in high-energy-density physics. NIF will be operated by LLNL under contract to the University of California (UC) as a national user facility. NIF is a low-hazard, radiological facility, and its operation will meet all applicable federal, state, and local Environmental Safety and Health (ES and H) requirements. The NCTS Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope, cost, and schedule. The NIF Director controls the NIF Cryogenic Target Systems Interim Management Plan. Overall scope content and execution schedules for the High Energy Density Physics Campaign (SSP Campaign 10) are currently undergoing rebaselining and will be brought into alignment with resources expected to be available throughout the NNSA Future Years National Security Plan (FYNSP). The revised schedule for

  3. RMP Guidance for Chemical Distributors - Appendix D: OSHA Guidance on PSM

    Science.gov (United States)

    Guidance on the Process Safety Management standard says information (including MSDS) about chemicals, including process intermediates, must enable accurate assessment of fire/explosion characteristics, reactivity hazards, and corrosing/erosion effects.

  4. A Formal Investigation of the Organization of Guidance Behavior: Implications for Humans and Autonomous Guidance

    Science.gov (United States)

    Kong, Zhaodan

    Guidance behavior generated either by artificial agents or humans has been actively studied in the fields of both robotics and cognitive science. The goals of these two fields are different. The former is the automatic generation of appropriate or even optimal behavior, while the latter is the understanding of the underlying mechanism. Their challenges, though, are closely related, the most important one being the lack of a unified, formal and grounded framework where the guidance behavior can be modeled and studied. This dissertation presents such a framework. In this framework, guidance behavior is analyzed as the closed-loop dynamics of the whole agent-environment system. The resulting dynamics give rise to interaction patterns. The central points of this dissertation are that: first of all, these patterns, which can be explained in terms of symmetries that are inherent to the guidance behavior, provide building blocks for the organization of behavior; second, the existence of these patterns and humans' organization of their guidance behavior based on these patterns are the reasons that humans can generate successful behavior in spite of all the complexities involved in the planning and control. This dissertation first gives an overview of the challenges existing in both scientific endeavors, such as human and animal spatial behavior study, and engineering endeavors, such as autonomous guidance system design. It then lays out the foundation for our formal framework, which states that guidance behavior should be interpreted as the collection of the closed-loop dynamics resulting from the agent's interaction with the environment. The following, illustrated by examples of three different UAVs, shows that the study of the closed-loop dynamics should not be done without the consideration of vehicle dynamics, as is the common practice in some of the studies in both autonomous guidance and human behavior analysis. The framework, the core concepts of which are

  5. Interim main report of the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Hedin, Allan

    2004-08-01

    This document is an interim report on the safety assessment SR-Can (SR in the acronym stands for Safety Report and Can is short for canister). The final SR-Can report will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of the present interim report is to demonstrate the methodology for safety assessment so that it can be reviewed before it is used in a license application. The assessment relates to the KBS-3 disposal concept in which copper canisters with a cast iron insert containing spent nuclear fuel are surrounded by bentonite clay and deposited at approximately 500 m depth in saturated, granitic rock. Preliminary data from the Forsmark site, presently being investigated by SKB as one of the candidate for a KBS-3 repository are used to some extent as examples. However, the collected data are yet too sparse to allow an evaluation of safety for this site. An important aim of this report is to demonstrate the proper handling of requirements on the safety assessment in applicable regulations. Therefore, regulations issued by the Swedish Nuclear Power Inspectorate and the Swedish Radiation Protection Authority are duplicated in an Appendix. The principal acceptance criterion requires that 'the annual risk of harmful effects after closure does not exceed 10 -6 for a representative individual in the group exposed to the greatest risk'. 'Harmful effects' refer to cancer and hereditary effects. Following the introductory chapter 1, this report outlines the methodology for the SR-Can assessment in chapter 2, and presents in chapters 3, 4 and 5 the initial state of the system and the plans and methods for handling external influences and internal processes, respectively. Function indicators are introduced in chapter 6 and a preliminary evaluation of these is given in chapter 7. The material presented in the first seven chapters is utilised in the scenario selection in chapter 8. Hydrogeological

  6. Interim main report of the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Hedin, Allan (ed.) [and others

    2004-08-01

    This document is an interim report on the safety assessment SR-Can (SR in the acronym stands for Safety Report and Can is short for canister). The final SR-Can report will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of the present interim report is to demonstrate the methodology for safety assessment so that it can be reviewed before it is used in a license application. The assessment relates to the KBS-3 disposal concept in which copper canisters with a cast iron insert containing spent nuclear fuel are surrounded by bentonite clay and deposited at approximately 500 m depth in saturated, granitic rock. Preliminary data from the Forsmark site, presently being investigated by SKB as one of the candidate for a KBS-3 repository are used to some extent as examples. However, the collected data are yet too sparse to allow an evaluation of safety for this site. An important aim of this report is to demonstrate the proper handling of requirements on the safety assessment in applicable regulations. Therefore, regulations issued by the Swedish Nuclear Power Inspectorate and the Swedish Radiation Protection Authority are duplicated in an Appendix. The principal acceptance criterion requires that 'the annual risk of harmful effects after closure does not exceed 10{sup -6} for a representative individual in the group exposed to the greatest risk'. 'Harmful effects' refer to cancer and hereditary effects. Following the introductory chapter 1, this report outlines the methodology for the SR-Can assessment in chapter 2, and presents in chapters 3, 4 and 5 the initial state of the system and the plans and methods for handling external influences and internal processes, respectively. Function indicators are introduced in chapter 6 and a preliminary evaluation of these is given in chapter 7. The material presented in the first seven chapters is utilised in the scenario selection

  7. Finding of no significant impact. Consolidation and interim storage of special nuclear material at Rocky Flats Environmental Technology Site

    International Nuclear Information System (INIS)

    1995-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA -- 1060, for the consolidation, processing, and interim storage of Category I and II special nuclear material (SNM) in Building 371 at the Rocky Flats Environmental Technology Site (hereinafter referred to as Rocky Flats or Site), Golden, Colorado. The scope of the EA included alternatives for interim storage including the no action alternative, the construction of a new facility for interim storage at Rocky Flats, and shipment to other DOE facilities for interim storage

  8. Finding of no significant impact. Consolidation and interim storage of special nuclear material at Rocky Flats Environmental Technology Site

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA -- 1060, for the consolidation, processing, and interim storage of Category I and II special nuclear material (SNM) in Building 371 at the Rocky Flats Environmental Technology Site (hereinafter referred to as Rocky Flats or Site), Golden, Colorado. The scope of the EA included alternatives for interim storage including the no action alternative, the construction of a new facility for interim storage at Rocky Flats, and shipment to other DOE facilities for interim storage.

  9. Flu Vaccine Guidance for Patients with Immune Deficiency

    Science.gov (United States)

    ... Guidance for Patients with Immune Deficiency Share | Flu Vaccine Guidance for Patients with Immune Deficiency This article ... should patients with immune deficiency be given the vaccine? Immune deficient patients have a decreased resistance to ...

  10. USDOT guidance summary for connected vehicle deployments : safety management.

    Science.gov (United States)

    2016-07-01

    This document provides guidance material in regards to safety management plan for the CV Pilots DeploymentConcept Development Phase. This guidance provides key concepts and references in developing the SafetyManagement Plan in Task 4, lists relevant ...

  11. Early interim 18F-FDG PET in Hodgkin's lymphoma: evaluation on 304 patients

    International Nuclear Information System (INIS)

    Zinzani, Pier Luigi; Stefoni, Vittorio; Broccoli, Alessandro; Argnani, Lisa; Baccarani, Michele; Rigacci, Luigi; Puccini, Benedetta; Castagnoli, Antonio; Vaggelli, Luca; Zanoni, Lucia; Fanti, Stefano

    2012-01-01

    The use of early (interim) PET restaging during first-line therapy of Hodgkin's lymphoma (HL) in clinical practice has considerably increased because of its ability to provide early recognition of treatment failure allowing patients to be transferred to more intensive treatment regimens. Between June 1997 and June 2009, 304 patients with newly diagnosed HL (147 early stage and 157 advanced stage) were treated with the ABVD regimen at two Italian institutions. Patients underwent PET staging and restaging at baseline, after two cycles of therapy and at the end of the treatment. Of the 304 patients, 53 showed a positive interim PET scan and of these only 13 (24.5%) achieved continuous complete remission (CCR), whereas 251 patients showed a negative PET scan and of these 231 (92%) achieved CCR. Comparison between interim PET-positive and interim PET-negative patients indicated a significant association between PET findings and 9-year progression-free survival and 9-year overall survival, with a median follow-up of 31 months. Among the early-stage patients, 19 had a positive interim PET scan and only 4 (21%) achieved CCR; among the 128 patients with a negative interim PET scan, 122 (97.6%) achieved CCR. Among the advanced-stage patients, 34 showed a persistently positive PET scan with only 9 (26.4%) achieving CCR, whereas 123 showed a negative interim PET scan with 109 (88.6%) achieving CCR. Our results demonstrate the role of an early PET scan as a significant step forward in the management of patients with early-stage or advanced-stage HL. (orig.)

  12. Design criteria for the 200-ZP-1 interim remedial measure

    International Nuclear Information System (INIS)

    Mudge, J.F.; Olson, J.W.

    1995-08-01

    The Interim Remedial Measure Proposed Plan for the 200-ZP-1 Operable Unit recommended a pump and treat action to contain contaminated groundwater and limit further degradation of groundwater due to elevated concentrations of carbon tetrachloride, chloroform, and trichloroethylene in the 200-ZP-1 Operable Unit. This design criteria document defines the Project. The Project encompasses: site preparation; development of groundwater wells for monitoring, extraction, and injection; extraction and injection equipment; construction of a treatment system with support buildings/utilities; management; engineering design, analysis, and reporting; and operation and maintenance. A groundwater pump and treat system, hereafter the System, will be composed of extraction wells, a piping network, treatment equipment, water storage, and injection wells. Based upon engineering judgment, the selected technology in the proposed plan (DOE-RL 1994a) is air stripping of the organic contaminants followed by vapor-phase adsorption onto granulated activated carbon (GAC); liquid-phase GAC may be required as a polishing step. The Treatment Equipment refers to air stripping towers, adsorption vessels, water pumps, air blowers, instrumentation, and control devices which will be procured as a turn-key system

  13. Conceptual design of interim storage facility for CNAI

    International Nuclear Information System (INIS)

    Fuenzalida Troyano, Carlos S.; Bergallo, Juan E.; Nassini, Horacio E.P.; Blanco, Anibal; Delmastro, Dario F.

    2007-01-01

    The reduced storage capacity available in the two spent fuel pools of argentine PHWR Atucha-1 power plant, the current plans for extending the reactor operation beyond its design lifetime, and the government decision on Atucha-2 NPP construction ending, have motivated the evaluation of a dry storage option for the interim management of spent fuel assemblies. Two different designs are presently being analyzed by an expert working group, from both technical and economical points of views. Authors are proposing a modular system consisting of an arrangement of reinforced concrete structures into which welded metallic canisters loaded with 37 spent fuel assemblies each stored in horizontal position. The reinforced concrete module is designed to provide the necessary physical protection and biological shielding to the loaded canisters during long-term storage, as well as passive means to remove the spent fuel decay heat by a combination of radiation, conduction and natural air convection. In this works are presented advances in the conceptual designs for a spent nuclear fuel system to Atucha I nuclear power plant. (author) [es

  14. Interim performance criteria for photovoltaic energy systems. [Glossary included

    Energy Technology Data Exchange (ETDEWEB)

    DeBlasio, R.; Forman, S.; Hogan, S.; Nuss, G.; Post, H.; Ross, R.; Schafft, H.

    1980-12-01

    This document is a response to the Photovoltaic Research, Development, and Demonstration Act of 1978 (P.L. 95-590) which required the generation of performance criteria for photovoltaic energy systems. Since the document is evolutionary and will be updated, the term interim is used. More than 50 experts in the photovoltaic field have contributed in the writing and review of the 179 performance criteria listed in this document. The performance criteria address characteristics of present-day photovoltaic systems that are of interest to manufacturers, government agencies, purchasers, and all others interested in various aspects of photovoltaic system performance and safety. The performance criteria apply to the system as a whole and to its possible subsystems: array, power conditioning, monitor and control, storage, cabling, and power distribution. They are further categorized according to the following performance attributes: electrical, thermal, mechanical/structural, safety, durability/reliability, installation/operation/maintenance, and building/site. Each criterion contains a statement of expected performance (nonprescriptive), a method of evaluation, and a commentary with further information or justification. Over 50 references for background information are also given. A glossary with definitions relevant to photovoltaic systems and a section on test methods are presented in the appendices. Twenty test methods are included to measure performance characteristics of the subsystem elements. These test methods and other parts of the document will be expanded or revised as future experience and needs dictate.

  15. Database and Interim Glass Property Models for Hanford HLW Glasses

    International Nuclear Information System (INIS)

    Hrma, Pavel R; Piepel, Gregory F; Vienna, John D; Cooley, Scott K; Kim, Dong-Sang; Russell, Renee L

    2001-01-01

    The purpose of this report is to provide a methodology for an increase in the efficiency and a decrease in the cost of vitrifying high-level waste (HLW) by optimizing HLW glass formulation. This methodology consists in collecting and generating a database of glass properties that determine HLW glass processability and acceptability and relating these properties to glass composition. The report explains how the property-composition models are developed, fitted to data, used for glass formulation optimization, and continuously updated in response to changes in HLW composition estimates and changes in glass processing technology. Further, the report reviews the glass property-composition literature data and presents their preliminary critical evaluation and screening. Finally the report provides interim property-composition models for melt viscosity, for liquidus temperature (with spinel and zircon primary crystalline phases), and for the product consistency test normalized releases of B, Na, and Li. Models were fitted to a subset of the screened database deemed most relevant for the current HLW composition region

  16. The UN Interim Administration Mission in Kosovo (UNMIK

    Directory of Open Access Journals (Sweden)

    Alfonso J. Iglesias Velasco

    2001-12-01

    Full Text Available The current situation in the Province of Kosovo in the Republic of Serbia within the Yugoslav State became unsustainable in the late 1990´s as a result of the repressive policies of the Serbian authorities toward the Kosovar Albanians. International efforts tofind a peaceful solution to the conflict were unsuccessful, in large measure on account of Serbian intransigence, and the intensification of the conflict with tragic consequences for the Kosovar civilian population led the Atlantic Alliance in the spring of 1999 to a carryout a military intervention of, to say the least, dubious legality under international law, which in turn forced Serbian leaders to bow to the application of the solution worked out by the international community in the Rambouillet Accords and set down in UN Security Council Resolution 1244 (1999 of June 10, 1999. This resolution provided for two international entities in the province, one a security force (KFOR and the other civilian, the UN Interim Administration Mission (UNMIK. This paper analyzes the mission’s mandate and structure as well as the evolution of the peace process.

  17. Lamar Low-Level Jet Program Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Kelley, N.; Shirazi, M.; Jager, D.; Wilde, S.; Adams, J.; Buhl, M.; Sullivan, P.; Patton, E.

    2004-01-01

    This interim report presents the results to date from the Lamar Low-Level Jet Program (LLLJP) that has been established as joint effort among the U.S. Department of Energy (DOE), the National Wind Technology Center (NWTC) of the National Renewable Energy Laboratory (NREL), and General Electric Wind Energy (GE Wind). The purpose of this project is to develop an understanding of the influence of nocturnal low-level jet streams on the inflow turbulence environment and the documenting of any potential operating impacts on current large wind turbines and the Low Wind Speed Turbine (LWST) designs of the future. A year's record of detailed nocturnal turbulence measurements has been collected from NREL instrumentation installed on the GE Wind 120-m tower in southeastern Colorado and supplemented with mean wind profile data collected using an acoustic wind profiler or SODAR (Sound Detection and Ranging). The analyses of measurements taken as part of a previous program conducted at the NWTC have been used to aid in the interpretation of the results of representative case studies of data collected from the GE Wind tower.

  18. Eos Interviews Robert Van Hook, Former AGU Interim Executive Director

    Science.gov (United States)

    Showstack, Randy

    2010-08-01

    Robert Van Hook, who served as AGU's interim executive director since January 2009, led the organization during a transition period that began with the retirement of long-serving executive director A. F. (“Fred”) Spilhaus Jr. Van Hook's tenure concluded on 30 August when Christine McEntee assumed her position as AGU's new executive director (see Eos, 91(17), 153, 156, 2010). During his tenure at AGU, which overlapped with a global economic recession, Van Hook helped to guide the organization through key structural governance changes, strategic planning, and upgrades in technology, human resources, and accounting. He also helped to revitalize public outreach and member services, among many other efforts. Van Hook, president of Transition Management Consulting, recently reflected upon his tenure, the transition period, and the future of AGU. Van Hook credits AGU's strong volunteer leadership—including past presidents Tim Killeen and Tim Grove, current president Mike McPhaden, and president-elect Carol Finn—for courage in moving the organization through a successful transition. “They were the ones who shoved the boat off from the shore. I was lucky enough to be invited into the boat,” he said. He also credits the staff for their resiliency and commitment to supporting AGU's science.

  19. Model for low temperature oxidation during long term interim storage

    International Nuclear Information System (INIS)

    Desgranges, Clara; Bertrand, Nathalie; Gauvain, Danielle; Terlain, Anne; Poquillon, Dominique; Monceau, Daniel

    2004-01-01

    For high-level nuclear waste containers in long-term interim storage, dry oxidation will be the first and the main degradation mode during about one century. The metal lost by dry oxidation over such a long period must be evaluated with a good reliability. To achieve this goal, modelling of the oxide scale growth is necessary and this is the aim of the dry oxidation studies performed in the frame of the COCON program. An advanced model based on the description of elementary mechanisms involved in scale growth at low temperatures, like partial interfacial control of the oxidation kinetics and/or grain boundary diffusion, is developed in order to increase the reliability of the long term extrapolations deduced from basic models developed from short time experiments. Since only few experimental data on dry oxidation are available in the temperature range of interest, experiments have also been performed to evaluate the relevant input parameters for models like grain size of oxide scale, considering iron as simplified material. (authors)

  20. Kennedy Space Center Press Site (SWMU 074) Interim Measure Report

    Science.gov (United States)

    Applegate, Joseph L.

    2015-01-01

    This report summarizes the Interim Measure (IM) activities conducted at the Kennedy Space Center (KSC) Press Site ("the Press Site"). This facility has been designated as Solid Waste Management Unit 074 under KSC's Resource Conservation and Recovery Act Corrective Action program. The activities were completed as part of the Vehicle Assembly Building (VAB) Area Land Use Controls Implementation Plan (LUCIP) Elimination Project. The purpose of the VAB Area LUCIP Elimination Project was to delineate and remove soil affected with constituents of concern (COCs) that historically resulted in Land Use Controls (LUCs). The goal of the project was to eliminate the LUCs on soil. LUCs for groundwater were not addressed as part of the project and are not discussed in this report. This report is intended to meet the Florida Department of Environmental Protection (FDEP) Corrective Action Management Plan requirement as part of the KSC Hazardous and Solid Waste Amendments permit and the U.S. Environmental Protection Agency's (USEPA's) Toxic Substance Control Act (TSCA) self-implementing polychlorinated biphenyl (PCB) cleanup requirements of 40 Code of Federal Regulations (CFR) 761.61(a).

  1. Database and Interim Glass Property Models for Hanford HLW Glasses

    Energy Technology Data Exchange (ETDEWEB)

    Hrma, Pavel R.; Piepel, Gregory F.; Vienna, John D.; Cooley, Scott K.; Kim, Dong-Sang; Russell, Renee L.

    2001-07-24

    The purpose of this report is to provide a methodology for an increase in the efficiency and a decrease in the cost of vitrifying high-level waste (HLW) by optimizing HLW glass formulation. This methodology consists in collecting and generating a database of glass properties that determine HLW glass processability and acceptability and relating these properties to glass composition. The report explains how the property-composition models are developed, fitted to data, used for glass formulation optimization, and continuously updated in response to changes in HLW composition estimates and changes in glass processing technology. Further, the report reviews the glass property-composition literature data and presents their preliminary critical evaluation and screening. Finally the report provides interim property-composition models for melt viscosity, for liquidus temperature (with spinel and zircon primary crystalline phases), and for the product consistency test normalized releases of B, Na, and Li. Models were fitted to a subset of the screened database deemed most relevant for the current HLW composition region.

  2. Safety aspects of spent nuclear fuel interim storage installations

    International Nuclear Information System (INIS)

    Romanato, Luiz Sergio

    2007-01-01

    Nowadays safety and security of spent nuclear fuel (SNF) interim storage installations are very important, due to a great concentration of fission products, actinides and activation products. In this kind of storage it is necessary to consider the physical security. Nuclear installations have become more vulnerable. New types of accidents must be considered in the design of these installations, which in the early days were not considered like: fissile material stolen, terrorists' acts and war conflicts, and traditional accidents concerning the transport of the spent fuel from the reactor to the storage location, earthquakes occurrence, airplanes crash, etc. Studies related to airplane falling had showed that a collision of big commercials airplanes at velocity of 800 km/h against SNF storage and specially designed concrete casks, do not result in serious structural injury to the casks, and not even radionuclides liberation to the environment. However, it was demonstrated that attacks with modern military ammunitions, against metallic casks, are calamitous. The casks could not support a direct impact of this ammo and the released radioactive materials can expose the workers and public as well the local environment to harmful radiation. This paper deals about the main basic aspects of a dry SNF storage installation, that must be physically well protected, getting barriers that difficult the access of unauthorized persons or vehicles, as well as, must structurally resist to incidents or accidents caused by unauthorized intrusion. (author)

  3. Interim versus standard methadone treatment: a benefit-cost analysis.

    Science.gov (United States)

    Schwartz, Robert P; Alexandre, Pierre K; Kelly, Sharon M; O'Grady, Kevin E; Gryczynski, Jan; Jaffe, Jerome H

    2014-03-01

    A benefit-cost analysis was conducted as part of a clinical trial in which newly-admitted methadone patients were randomly assigned to interim methadone (IM; methadone without counseling) for the first 4 months of 12 months of methadone treatment or 12 months of methadone with one of two counseling conditions. Health, residential drug treatment, criminal justice costs, and income data in 2010 dollars were obtained at treatment entry, and 4- and 12-month follow-up from 200 participants and program costs were obtained. The net benefits of treatment were greater for the IM condition but controlling for the baseline variables noted above, the difference between conditions in net monetary benefits was not significant. For the combined sample, there was a pre- to post-treatment net benefit of $1470 (95% CI: -$625; $3584) and a benefit-cost ratio of 1.5 (95% CI: 0.8, 2.3), but using our conservative approach to calculating benefits, these values were not significant. © 2014.

  4. Honeywell Cascade Distiller System Performance Testing Interim Results

    Science.gov (United States)

    Callahan, Michael R.; Sargusingh, Miriam

    2014-01-01

    The ability to recover and purify water through physiochemical processes is crucial for realizing long-term human space missions, including both planetary habitation and space travel. Because of their robust nature, distillation systems have been actively pursued as one of the technologies for water recovery. The Cascade Distillation System (CDS) is a vacuum rotary distillation system with potential for greater reliability and lower energy costs than existing distillation systems. The CDS was previously under development through Honeywell and NASA. In 2009, an assessment was performed to collect data to support down-selection and development of a primary distillation technology for application in a lunar outpost water recovery system. Based on the results of this testing, an expert panel concluded that the CDS showed adequate development maturity, TRL-4, together with the best product water quality and competitive weight and power estimates to warrant further development. The Advanced Exploration Systems (AES) Water Recovery Project (WRP) worked to address weaknesses identified by The Panel; namely bearing design and heat pump power efficiency. Testing at the NASA-JSC Advanced Exploration System Water Laboratory (AES Water Lab) using a prototype Cascade Distillation Subsystem (CDS) wastewater processor (Honeywell International, Torrance, Calif.) with test support equipment and control system developed by Johnson Space Center was performed to evaluate performance of the system with the upgrades. The CDS will also have been challenged with ISS analog waste streams and a subset of those being considered for Exploration architectures. This paper details interim results of the AES WRP CDS performance testing.

  5. Spent Fuel Long Term Interim Storage: The Spanish Policy

    International Nuclear Information System (INIS)

    Fernandez-Lopez, Javier

    2014-01-01

    ENRESA is the Spanish organization responsible for long-term management of all categories of radioactive waste and nuclear spent fuel and for decommissioning nuclear installations. It is also in charge of the management of the funds collected from waste producers and electricity consumers. The national policy about radioactive waste management is established at the General Radioactive Waste Plan by the Government upon proposal of the Ministry of Industry, Energy and Tourism. Now the Plan in force is the Sixth Plan approved in 2006. The policy on spent nuclear fuel, after description of the current available options, is set up as a long term interim storage at a Centralized Temporary Storage facility (CTS, or ATC in Spanish acronym) followed by geologic disposal, pending technological development on other options being eligible in the future. After a site selection process launched in 2009, the site for the ATC has been chosen at the end of 2011. The first steps for the implementation of the facility are described in the present paper. (authors)

  6. SI units for radiation protection - an interim measure

    International Nuclear Information System (INIS)

    Burns, J.E.

    1982-01-01

    The brief memorandum comments on the problems concerning the delay in publishing the report of the ICRU working group on the change to SI units and makes the following suggestions to organisations considering whether to change over to SI units in the near future: a) It would be preferable to delay change-over to SI units for quantities specifying radiation for protection purposes until ICRU publishes its recommendations. This would avoid the risk of having to make two successive changes in procedure, with their attendant cost, need for retraining and the possibility of errors. (b) If, however, in order to be consistent with a change to SI units that has already been made in other applications of radiation, there are strong reasons for changing to SI units before the ICRU recommendations are published, then as an interim measure, measurements of exposure may be converted to dose equivalent using the approximation that 1 mR = 10 μSv. A decision as to whether to alter the scales of existing instruments, or to convert readings to dose equivalent at a later stage will depend on individual circumstances. (U.K.)

  7. DOUBLE TRACKS Test Site interim corrective action plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The DOUBLE TRACKS site is located on Range 71 north of the Nellis Air Force Range, northwest of the Nevada Test Site (NTS). DOUBLE TRACKS was the first of four experiments that constituted Operation ROLLER COASTER. On May 15, 1963, weapons-grade plutonium and depleted uranium were dispersed using 54 kilograms of trinitrotoluene (TNT) explosive. The explosion occurred in the open, 0.3 m above the steel plate. No fission yield was detected from the test, and the total amount of plutonium deposited on the ground surface was estimated to be between 980 and 1,600 grams. The test device was composed primarily of uranium-238 and plutonium-239. The mass ratio of uranium to plutonium was 4.35. The objective of the corrective action is to reduce the potential risk to human health and the environment and to demonstrate technically viable and cost-effective excavation, transportation, and disposal. To achieve these objectives, Bechtel Nevada (BN) will remove soil with a total transuranic activity greater then 200 pCI/g, containerize the soil in ``supersacks,`` transport the filled ``supersacks`` to the NTS, and dispose of them in the Area 3 Radioactive Waste Management Site. During this interim corrective action, BN will also conduct a limited demonstration of an alternative method for excavation of radioactive near-surface soil contamination.

  8. SWSA 6 interim corrective measures environmental monitoring: FY 1990 results

    Energy Technology Data Exchange (ETDEWEB)

    Ashwood, T.L.; Spalding, B.P.

    1991-07-01

    This report presents the results and conclusions from a multifaceted monitoring effort associated with the high-density polyethylene caps installed in Solid Waste Storage Area (SWSA) 6 at Oak Ridge National Laboratory (ORNL) as an interim corrective measure (ICM). The caps were installed between November 1988 and June 1989 to meet Resource Conservation and Recovery Act (RCRA) requirements for closure of those areas of SWSA 6 that had received RCRA-regulated wastes after November 1980. Three separate activities were undertaken to evaluate the performance of the caps: (1) wells were installed in trenches to be covered by the caps, and water levels in these intratrench wells were monitored periodically; (2) samples were taken of the leachate in the intratrench wells and were analyzed for a broad range of radiological and chemical contaminants; and (3) water levels in wells outside the trenches were monitored periodically. With the exception of the trench leachate sampling, each of these activities spanned the preconstruction, construction, and postconstruction periods. Findings of this study have important implications for the ongoing remedial investigation in SWSA 6 and for the design of other ICMs. 51 figs., 2 tabs.

  9. Review Guidance for the TWRS FSAR amendment for Waste Retrieval and waste feed delivery

    International Nuclear Information System (INIS)

    GRIFFITH, R.W.

    1999-01-01

    This review guidance (Guide) was developed for Office of River Protection (ORP) reviewers to use in reviewing the amendment to the Tank Waste Remediation System (TWRS) Final Safety Analysis Report (FSAR) covering waste retrieval and waste feed delivery. Waste retrieval and waste feed delivery are necessary to supply nuclear waste from TWRS storage tanks to the TWRS Privatization (TWRS-P) Contractor's vitrification facility and to receive intermediate waste from the vitrification facility back into the TWRS tank farms for interim storage. An amendment to the approved TWRS FSAR (HNF-SD-WM-SAR-067,Rev. 0) is necessary to change the authorization basis to accommodate waste retrieval and waste feed delivery. The ORP'S safety responsibility in reviewing the FSAR amendment is to determine that reasonable assurance exists that waste retrieval and waste feed delivery operations can be accomplished with adequate safety for the workers, the public, and the environment. To carry out this responsibility, the ORP will evaluate the Contractor's amendment to the TWRS FSAR for waste retrieval and waste feed delivery to determine whether the submittal provides adequate safety and complies with applicable regulatory requirements

  10. Best clinical practice guidance for local analgesia in paediatric dentistry: an EAPD policy document.

    Science.gov (United States)

    Kühnisch, J; Daubländer, M; Klingberg, G; Dougall, A; Spyridonos Loizides, M; Stratigaki, E; Amar, J L; Anttonen, V; Duggal, M; Gizani, S

    2017-10-01

    The European Academy of Paediatric Dentistry (EAPD) proposes this best-practice guidance to help practitioners to decide when and how to use local analgesia to control pain in children, adolescents, and medically compromised individuals during the delivery of oral health care. A search of different databases was conducted using all terms relevant to the subject. Relevant papers were identified after a review of their titles, abstracts or full papers. Three workshops were held during the corresponding EAPD interim seminar in Torino (Italy) in 2017. Several statements were agreed upon and, furthermore, knowledge gaps were identified. An important outcome was that when local analgesia administered appropriately-correct choice of agent(s) and dosage, proper route of administration-it is, firstly, clinically effective for pain-control in treating children and, secondly, it carries a very low risk of morbidity including adverse or side-effects. Furthermore, several gaps in knowledge were identified during the workshop which indicates future research needs. Most importantly it remains unsatisfactory that in several European countries the most frequently used injectable local analgesic agent, articaine, is not approved for usage in children below the age of 4 years. When considering the dental demand to treat vulnerable (medically compromised) children and adolescents in a safe, painless, less-invasive and effective way, there seems to be an urgent need to close these gaps in knowledge.

  11. Review Guidance for the TWRS FSAR amendment for Waste Retrieval and waste feed delivery

    Energy Technology Data Exchange (ETDEWEB)

    GRIFFITH, R.W.

    1999-10-01

    This review guidance (Guide) was developed for Office of River Protection (ORP) reviewers to use in reviewing the amendment to the Tank Waste Remediation System (TWRS) Final Safety Analysis Report (FSAR) covering waste retrieval and waste feed delivery. Waste retrieval and waste feed delivery are necessary to supply nuclear waste from TWRS storage tanks to the TWRS Privatization (TWRS-P) Contractor's vitrification facility and to receive intermediate waste from the vitrification facility back into the TWRS tank farms for interim storage. An amendment to the approved TWRS FSAR (HNF-SD-WM-SAR-067, Rev. 0) is necessary to change the authorization basis to accommodate waste retrieval and waste feed delivery. The ORP'S safety responsibility in reviewing the FSAR amendment is to determine that reasonable assurance exists that waste retrieval and waste feed delivery operations can be accomplished with adequate safety for the workers, the public, and the environment. To carry out this responsibility, the ORP will evaluate the Contractor's amendment to the TWRS FSAR for waste retrieval and waste feed delivery to determine whether the submittal provides adequate safety and complies with applicable regulatory requirements.

  12. Strategies for Structural Youth Unemployment: a Capability Approach for Guidance

    OpenAIRE

    Massimiliano Costa; Daniele Morselli; John Polesel; Suzanne Rice

    2015-01-01

    The aim of this article is to present an innovative approach for guidance. The article starts by introducing the structural reason of unemployment in Italy. It presents the Australian model of guidance and the new reforms on guidance which are being introduced in Italy. It then describes a Change Laboratory intervention carried in a vocational setting in Australia in 2012, which is proposed as model of guidance based on the capability approach.The different stakeholders actively participate i...

  13. Guidance and justification in particularistic ethics.

    Science.gov (United States)

    Kihlbom, U

    2000-10-01

    This paper argues that, contrary to a common line of criticism followed by scholars such as Helga Kuhse, a particularistic version of virtue ethics properly elaborated, can provide sound moral guidance and a satisfactory account for moral justification of our opinions regarding, for instance, health care practice. In the first part of the paper, three criteria for comparing normative theories with respect to action-guiding power are outlined, and it is argued that the presented particularistic version of virtue ethics actually can provide more guidance than the universalistic theories followed by Kuhse and others. In the second part of the paper it is claimed that universalist normative theories have serious problems accounting for the role that moral principles are supposed to play in the justification, of moral opinions, whereas the present version of virtue ethics accommodates a plausible alternative idea of justification without invoking moral principles or eschewing objectivity.

  14. Guidance for UMTRA project surveillance and maintenance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-01-01

    The Guidance for UMTRA Project Surveillance and Maintenance describes the procedures that will be used to verify that Uranium Mill Tailings Remedial Action (UMTRA) Project disposal sites continue to function as designed. The approach of this guidance document is to identify surveillance requirements and maintenance procedures that will be used to comply with NRC license requirements. This document addresses five primary activities: Definition and characterization of final site conditions. Site inspections; Ground-water monitoring; Aerial photography; and Custodial maintenance and contingency repair. Final site conditions will be defined and characterized prior to the completion of remedial actions at a site. As-built drawings will be compiled, a final topographic survey will be performed, a vicinity map will be prepared, and ground and aerial photographs will be taken. Survey monuments, site markers, and signs will be established as will a network of monitoring wells.

  15. Vocational guidance: A primary function of education

    Science.gov (United States)

    Röhrs, Hermann

    1992-05-01

    The world of work as part of our dynamic society is the result of a permanent change. This development has an influence on the school and its tasks. Apart from industrialisation there is computerisation which requires, to an important extent, individual judgement and inventiveness on the part of the working population. The school has not only to cope with these changes but has also to try to influence them through vocational orientation and guidance and its continual reform. The aim of the school is the development of a critical sense with the purpose of humanising the whole process. The importance of vocational orientation and guidance is increasing, and they have to become a task of our schools. The topic should therefore also be included in teacher training as well as in further education.

  16. Adapting haptic guidance authority based on user grip

    NARCIS (Netherlands)

    Smisek, J.; Mugge, W.; Smeets, J.B.J.; Van Paassen, M.M.; Schiele, A

    2014-01-01

    Haptic guidance systems support the operator in task execution using additional forces on the input device. Scaling of the guidance forces determines the control authority of the support system. As task complexity may vary, one level of the guidance scaling may be insufficient, and adaptation of the

  17. Factors affecting guidance and counseling programme in primary ...

    African Journals Online (AJOL)

    The Government and the schools' management do not provide the needed infrastructure for guidance and counseling. It was recommended that training of teachers in guidance and counseling be given priority by the schools and the government. KEY WORDS: Guidance, counselling, primary school and factors.

  18. IMPACT OF CAREER GUIDANCE AND COUNSELING ON STUDENT'S CAREER DEVELOPMENT

    OpenAIRE

    Dr. Paras Jain

    2017-01-01

    Face to face career guidance and counseling is effective and important aspect of life. It can make or break career. Career counseling represents an important variable to better understand career intervention underlying mechanisms. The trend of career guidance in India is not satisfactory. Present study is focused on finding of impacts of career guidance and counseling on students regarding career development.

  19. Guidance Concept for a Mars Ascent Vehicle First Stage

    Science.gov (United States)

    Queen, Eric M.

    2000-01-01

    This paper presents a guidance concept for use on the first stage of a Mars Ascent Vehicle (MAV). The guidance is based on a calculus of variations approach similar to that used for the final phase of the Apollo Earth return guidance. A three degree-of-freedom (3DOF) Monte Carlo simulation is used to evaluate performance and robustness of the algorithm.

  20. Neural inversion of flight guidance dynamics

    OpenAIRE

    Lu , Wen Chi; Faye , Roger; Brandao-Ramos , Alexandre Carlos; Slama , Jules Ghislain; Mora-Camino , Felix Antonio Claudio

    2007-01-01

    International audience; Differential flatness, a property of some dynamic systems which has been recognized only recently, has made possible the development of new tools to control complex nonlinear dynamic systems. Many dynamic nonlinear systems have been proved to be differentially flat. In this paper, it is shown that the inertial position coordinates of an aircraft can be considered as differential flat outputs for its flight guidance dynamics. Since this differential flatness property is...

  1. The Ranging and Nanosatellite Guidance Experiment (RANGE)

    OpenAIRE

    Gunter, Brian C.; Davis, Byron; Lightsey, Glenn; Braun, Robert D.

    2016-01-01

    The Ranging And Nanosatellite Guidance Experiment (RANGE) cubesat mission was recently selected for a flight opportunity as part of the Skybox University Cubesat Partnership, with a tentative launch date scheduled for 2016. The RANGE mission involves two 1.5U cubesats flying in a leader-follower formation with the goal of improving the relative and absolute positioning capabilities of nanosatellites. The satellites' absolute positions will be tracked using GPS receivers synchronized with mini...

  2. Meninges-derived cues control axon guidance.

    Science.gov (United States)

    Suter, Tracey A C S; DeLoughery, Zachary J; Jaworski, Alexander

    2017-10-01

    The axons of developing neurons travel long distances along stereotyped pathways under the direction of extracellular cues sensed by the axonal growth cone. Guidance cues are either secreted proteins that diffuse freely or bind the extracellular matrix, or membrane-anchored proteins. Different populations of axons express distinct sets of receptors for guidance cues, which results in differential responses to specific ligands. The full repertoire of axon guidance cues and receptors and the identity of the tissues producing these cues remain to be elucidated. The meninges are connective tissue layers enveloping the vertebrate brain and spinal cord that serve to protect the central nervous system (CNS). The meninges also instruct nervous system development by regulating the generation and migration of neural progenitors, but it has not been determined whether they help guide axons to their targets. Here, we investigate a possible role for the meninges in neuronal wiring. Using mouse neural tissue explants, we show that developing spinal cord meninges produce secreted attractive and repulsive cues that can guide multiple types of axons in vitro. We find that motor and sensory neurons, which project axons across the CNS-peripheral nervous system (PNS) boundary, are attracted by meninges. Conversely, axons of both ipsi- and contralaterally projecting dorsal spinal cord interneurons are repelled by meninges. The responses of these axonal populations to the meninges are consistent with their trajectories relative to meninges in vivo, suggesting that meningeal guidance factors contribute to nervous system wiring and control which axons are able to traverse the CNS-PNS boundary. Copyright © 2017 Elsevier Inc. All rights reserved.

  3. Intraoperative guidance in maxillofacial and craniofacial surgery.

    Science.gov (United States)

    Hassfeld, S; Muehling, J; Wirtz, C R; Knauth, M; Lutze, T; Schulz, H J

    1997-01-01

    The authors' experiences with intraoperative computer assisted guidance in interventions in oromaxillofacial and craniofacial surgery are reported. The guidance system SPOCS (Surgical Planning and Orientation Computer Systems, Aesculap, Germany) consists of an infrared light emitting system of diodes and camera, an imaging workstation and assorted freehand instruments. The software is an updated version of the well-known Viewing Wand software (ISG Technologies, Canada). In tests on phantoms, the system proved a mean accuracy of less than 1.5 mm. Within the last 15 clinical tests, the system has achieved an accuracy better than 3 mm which, at the moment, the authors estimate to be sufficient to proceed with its clinical evaluation. Using bone screws to register the patient's position, an accuracy in the range of less than 2 mm in relation to bony reference points has been achieved. By visualizing the tip of the instrument in real time, this technique allows surgical interventions, even in anatomically complicated situations, without endangering vital neighbouring structures. The 'offset' function of the software, by which the surgeon can elongate the tip of the instrument virtually, allows the surgeon to analyse structures before they are penetrated by the instrument as in a 'look ahead' operation. The authors expect computer assisted simulation and guidance systems to improve surgical quality and reduce the risks associated with surgical interventions.

  4. Reliability history of the Apollo guidance computer

    Science.gov (United States)

    Hall, E. C.

    1972-01-01

    The Apollo guidance computer was designed to provide the computation necessary for guidance, navigation and control of the command module and the lunar landing module of the Apollo spacecraft. The computer was designed using the technology of the early 1960's and the production was completed by 1969. During the development, production, and operational phase of the program, the computer has accumulated a very interesting history which is valuable for evaluating the technology, production methods, system integration, and the reliability of the hardware. The operational experience in the Apollo guidance systems includes 17 computers which flew missions and another 26 flight type computers which are still in various phases of prelaunch activity including storage, system checkout, prelaunch spacecraft checkout, etc. These computers were manufactured and maintained under very strict quality control procedures with requirements for reporting and analyzing all indications of failure. Probably no other computer or electronic equipment with equivalent complexity has been as well documented and monitored. Since it has demonstrated a unique reliability history, it is important to evaluate the techniques and methods which have contributed to the high reliability of this computer.

  5. Skip entry trajectory planning and guidance

    Science.gov (United States)

    Brunner, Christopher William

    A numerical predictor-corrector (NPC) method for trajectory planning and closed-loop guidance of low lift-to-drag (L/D) ratio vehicles during the skip entry phase of a lunar-return mission is presented. The strategy calls for controlling the trajectory by modulation of the magnitude of the vehicle's bank angle. The magnitude of the bank angle used in the skip phase is determined by satisfying the downrange requirement to the landing site. The problem is formulated as a nonlinear univariate root-finding problem. Full three degree of freedom (3DOF) nonlinear trajectory dynamics are included to achieve high accuracy of the landing prediction. In addition, the proposed approach automatically yields a direct entry trajectory when the downrange is such that a skip entry is no longer necessary. The same algorithm repeatedly applied on-board in every guidance cycle realizes closed-loop guidance in the skip entry phase. A number of issues are identified and addressed that are critical in closed-loop implementations. Extensive 3DOF dispersion simulations are performed to evaluate the performance of the proposed approach, and the results demonstrate very reliable and robust performance of the algorithm in highly stressful dispersed conditions. Comparison is made between the proposed algorithm and an earlier skip algorithm developed for the Apollo space program. It is shown that the proposed algorithm is superior to the Apollo algorithm especially when used for entries with long downranges.

  6. NRC ARDC Guidance Support Status Report

    Energy Technology Data Exchange (ETDEWEB)

    Holbrook, Mark R. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2017-07-01

    This report provides a summary that reflects the progress and status of proposed regulatory design criteria for advanced non-light water reactor (LWR) designs in accordance with the Level 3 milestone M3AT-17IN2001013 in work package AT-17IN200101. These criteria have been designated as advanced reactor design criteria (ARDC) and they provide guidance to future applicants for addressing the general design criteria (GDC) that are currently applied specifically to LWR designs. This report provides a summary of Phase 2 activities related to the various tasks associated with ARDC development and the subsequent development of ARDC regulatory guidance for sodium fast reactor (SFR) and modular high-temperature gas-cooled reactor (HTGR) designs. Status Report Organization: Section 2 discusses the origin of the GDC and their application to LWRs. Section 3 addresses the objective of this initiative and how it benefits the advanced non-LWR reactor vendors. Section 4 discusses the scope and structure of the initiative. Section 5 provides background on the U.S. Department of Energy (DOE) ARDC team’s original development of the proposed ARDC that were submitted to the NRC for consideration. Section 6 provides a summary of recent ARDC Phase 2 activities. Appendices A through E document the DOE ARDC team’s public comments on various sections of the NRC’s draft regulatory guide DG–1330, “Guidance for Developing Principal Design Criteria for Non-Light Water Reactors.”

  7. Education, consultation, guidance, students, advisor, teacher

    Directory of Open Access Journals (Sweden)

    M Seyedmajidi

    2013-09-01

    Full Text Available Introduction: Student counseling and supervision play an important role to overcome learning problems and to achieve educational goals. The present study is intended to investigate viewpoints of students regarding educational guidance and advice studying at Babol University of Medical Sciences. Methods: In this descriptive cross-sectional survey, viewpoints of 480 students were collected by a questionnaire. The validity and reliability of the questionnaire had been approved before. Data were analyzed using SPSS version 17 software. Chi- square and ANOVA tests were administered. Results: 61.2% of all participants were female and 38.8% were males with mean age of 21.3±4.0. 37.2% of these students lacked sufficient knowledge and information on how to request from their advisors for help and guidance. Half of students (50.3% reported attendance of advisors and holding routine consultation is inappropriate. Advisors made more educational files for females compare to males (P=0.001. No difference observed regarding educational disciplines of the advisors regarding students were dissatisfied with help and guidance received from paramedics and dentistry students in most fields (87.3% and 81.5% respectively. Conclusion: It seems that either student has no sufficient information about tasks of advisors and/or advisors may not do their tasks properly. It is recommended the students to be acquainted with advisors’ tasks upon their entrance into the university. Training classes for new academics would be helpful.

  8. Long-term interim storage concepts with conditioning strategies ensuring compatibility with subsequent disposal or reprocessing

    International Nuclear Information System (INIS)

    Moitrier, C.; Tirel, I.; Villard, C.

    2000-01-01

    The objective of the CEA studies carried out under research topic 3 (long-term interim storage) of the 1991 French radioactive waste management law is to demonstrate the industrial feasibility of a comprehensive, flexible interim storage facility by thoroughly evaluating and comparing all the basic components of various interim storage concepts. In this context, the CEA is considering reference solutions or concepts based on three primary components (the package, the interim storage facility and the site) suitable for determining the specifications of a very long-term solution. Some aspects are examined in greater detail, such as the implementation of long-term technologies, conditioning processes ensuring the absence of water and contamination in the facility, or allowance for radioactive decay of the packages. The results obtained are continually compiled in reports substantiating the design options. These studies should also lead to an overall economic assessment in terms of the capital and operating cost requirements, thereby providing an additional basis for selecting the design options. The comparison with existing industrial facilities highlights the technical and economic progress represented by the new generation of interim storage units. (authors)

  9. Fit of interim crowns fabricated using photopolymer-jetting 3D printing.

    Science.gov (United States)

    Mai, Hang-Nga; Lee, Kyu-Bok; Lee, Du-Hyeong

    2017-08-01

    The fit of interim crowns fabricated using 3-dimensional (3D) printing is unknown. The purpose of this in vitro study was to evaluate the fit of interim crowns fabricated using photopolymer-jetting 3D printing and to compare it with that of milling and compression molding methods. Twelve study models were fabricated by making an impression of a metal master model of the mandibular first molar. On each study model, interim crowns (N=36) were fabricated using compression molding (molding group, n=12), milling (milling group, n=12), and 3D polymer-jetting methods. The crowns were prepared as follows: molding group, overimpression technique; milling group, a 5-axis dental milling machine; and polymer-jetting group using a 3D printer. The fit of interim crowns was evaluated in the proximal, marginal, internal axial, and internal occlusal regions by using the image-superimposition and silicone-replica techniques. The Mann-Whitney U test and Kruskal-Wallis tests were used to compare the results among groups (α=.05). Compared with the molding group, the milling and polymer-jetting groups showed more accurate results in the proximal and marginal regions (Ppolymer-jetting group was the most accurate, and compared with the other groups, the milling group showed larger internal discrepancies (PPolymer-jet 3D printing significantly enhanced the fit of interim crowns, particularly in the occlusal region. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  10. Commentary: Interim leadership of academic departments at U.S. medical schools.

    Science.gov (United States)

    Grigsby, R Kevin; Aber, Robert C; Quillen, David A

    2009-10-01

    Medical schools and teaching hospitals are experiencing more frequent turnover of department chairs. Loss of a department chair creates instability in the department and may have a negative effect on the organization at large. Interim leadership of academic departments is common, and interim chairs are expected to immediately demonstrate skills and leadership abilities. However, little is known about how persons are prepared to assume the interim chair role. Newer competencies for effective leadership include an understanding of the business of medicine, interpersonal and communication skills, the ability to deal with conflict and solve adaptive challenges, and the ability to build and work on teams. Medical schools and teaching hospitals need assistance to meet the unique training and support needs of persons serving as interim leaders. For example, the Association of American Medical Colleges and individual chair societies can develop programs to allow current chairs to reflect on their present positions and plan for the future. Formal leadership training, mentorship opportunities, and conscientious succession planning are good first steps in preparing to meet the needs of academic departments during transitions in leadership. Also, interim leadership experience may be useful as a means for "opening the door" to underrepresented persons, including women, and increasing the diversity of the leadership team.

  11. European Lifelong Guidance Policy Network Representatives' Conceptions of the Role of Information and Communication Technologies Related to National Guidance Policies

    Science.gov (United States)

    Kettunen, Jaana; Vuorinen, Raimo; Ruusuvirta, Outi

    2016-01-01

    This article reports findings from a phenomenographic investigation into European Lifelong Guidance Policy Network representatives' conceptions of the role of information and communication technologies (ICT) related to national lifelong guidance policies. The role of ICT in relation to national lifelong guidance policies was conceived as (1)…

  12. 49 CFR 37.169 - Interim requirements for over-the-road bus service operated by private entities.

    Science.gov (United States)

    2010-10-01

    ... of such devices, shall be permitted in the passenger compartment. When the bus is at rest at a stop... 49 Transportation 1 2010-10-01 2010-10-01 false Interim requirements for over-the-road bus service... Interim requirements for over-the-road bus service operated by private entities. (a) Private entities...

  13. 76 FR 61342 - Foreign-Trade Zone 72 Temporary/Interim Manufacturing Authority Brevini Wind USA, Inc., (Wind...

    Science.gov (United States)

    2011-10-04

    ... Foreign-Trade Zones Board Foreign-Trade Zone 72 Temporary/Interim Manufacturing Authority Brevini Wind USA, Inc., (Wind Turbine Gear Boxes); Notice of Approval On July 14, 2011, the Executive Secretary of the..., grantee of FTZ 72, requesting temporary/interim manufacturing (T/IM) authority, on behalf of Brevini Wind...

  14. 40 CFR 257.3-5 - Application to land used for the production of food-chain crops (interim final).

    Science.gov (United States)

    2010-07-01

    ... production of food-chain crops (interim final). 257.3-5 Section 257.3-5 Protection of Environment... Application to land used for the production of food-chain crops (interim final). (a) Cadmium. A facility or... for the production of food-chain crops shall not exist or occur, unless in compliance with all...

  15. 33 CFR 96.360 - Interim Safety Management Certificate: what is it and when can it be used?

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Interim Safety Management... VESSELS AND SAFETY MANAGEMENT SYSTEMS How Will Safety Management Systems Be Certificated and Enforced? § 96.360 Interim Safety Management Certificate: what is it and when can it be used? (a) A responsible...

  16. 75 FR 13484 - Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA...

    Science.gov (United States)

    2010-03-22

    ... DEPARTMENT OF COMMERCE [Docket T-1-2010] Foreign-Trade Zones Board Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA, Inc. (Cell Phones); Notice of.../ interim manufacturing (T/IM) authority, on behalf of LG Electronics Mobilecomm USA, Inc. (LGEMU), to...

  17. E-Area Performance Assessment Interim Measures Assessment FY2005

    International Nuclear Information System (INIS)

    Stallings, M

    2006-01-01

    After major changes to the limits for various disposal units of the E-Area Low Level Waste Facility (ELLWF) last year, no major changes have been made during FY2005. A Special Analysis was completed which removes the air pathway 14 C limit from the Intermediate Level Vault (ILV). This analysis will allow the disposal of reactor moderator deionizers which previously had no pathway to disposal. Several studies have also been completed providing groundwater transport input for future special analyses. During the past year, since Slit Trenches No.1 and No.2 were nearing volumetric capacity, they were operationally closed under a preliminary closure analysis. This analysis was performed using as-disposed conditions and data and showed that concrete rubble from the demolition of 232-F was acceptable for disposal in the STs even though the latest special analysis for the STs had reduced the tritium limits so that the inventory in the rubble exceeded limits. A number of special studies are planned during the next years; perhaps the largest of these will be revision of the Performance Assessment (PA) for the ELLWF. The revision will be accomplished by incorporating special analyses performed since the last PA revision as well as revising analyses to include new data. Projected impacts on disposal limits of more recent studies have been estimated. No interim measures will be applied during this year. However, it is being recommended that tritium disposals to the Components-in-Grout (CIG) Trenches be suspended until a limited Special Analysis (SA) currently in progress is completed. This SA will give recommendations for optimum placement of tritiated D-Area tower waste. Further recommendations for tritiated waste placement in the CIG Trenches will be given in the upcoming PA revision

  18. Status of the Galileo interim radiation electron model

    Science.gov (United States)

    Garrett, H. B.; Jun, I.; Ratliff, J. M.; Evans, R. W.; Clough, G. A.; McEntire, R. W.

    2003-04-01

    Measurements of the high energy, omni-directional electron environment by the Galileo spacecraft Energetic Particle Detector (EPD) were used to develop a new model of Jupiter's trapped electron radiation in the jovian equatorial plane for the range 8 to 16 Jupiter radii (1 jovian radius = 71,400 km). 10-minute averages of these data formed an extensive database of observations of the jovian radiation belts between Jupiter orbit insertion (JOI) in 1995 and 2002. These data were then averaged to provide a differential flux spectrum at 0.174, 0.304, 0.527, 1.5, 2.0, 11.0, and 31 MeV in the jovian equatorial plane as a function of radial distance. This omni-directional, equatorial model was combined with the original Divine model of jovian electron radiation to yield estimates of the out-of-plane radiation environment. That model, referred to here as the Galileo Interim Radiation Electron (or GIRE) model, was then used to calculate the Europa mission dose for an average and a 1-sigma worst-case situation. The prediction of the GIRE model is about a factor of 2 lower than the Divine model estimate over the range of 100 to 1000 mils (2.54 to 25.4 mm) of aluminum shielding, but exceeds the Divine model by about 50% for thicker shielding. The model, the steps leading to its creation, and relevant issues and concerns are discussed. While work remains to be done, the GIRE model clearly represents a significant step forward in the study of the jovian radiation environment, and it is a useful and valuable tool for estimating that environment for future space missions.

  19. Interim report of the task force on energy policy

    International Nuclear Information System (INIS)

    2001-01-01

    A Task Force was established by the Premier of British Columbia in August 2001 to draft an energy policy framework for the province. Based on best practices worldwide, and keeping in mind the specific energy needs of British Columbia, this framework aims at fostering energy development in British Columbia, in accordance with exemplary environmental practices. This interim report comprises the preliminary findings of the Task Force, and public input is sought before the final report is finalized and presented to government. The energy sector of British Columbia comprises hydroelectric power, oil, gas and coal resources. In addition, green energy and alternative energy technologies are being developed, such as wind, solar, and wave power, and hydrogen fuel cells. Industry and individual consumers are well served by the highly developed transmission and distribution systems for energy. Several strategic directions were identified by the Task Force for inclusion in the energy policy of British Columbia, to meet its full potential. They are: growth to ensure safe, reliable energy and take advantage of economic opportunities; diversification; competitiveness; industry restructuring and expansion; environmental imperative; government leadership; and community and First Nations' involvement. Some changes are also required for the continuing success of the energy sector in British Columbia: a move to fully competitive markets in the electricity system, the development of natural gas storage capacity in the Lower Mainland, additional considerations for coal use, and the development of alternative energy sources. It is expected that private capital and more energy supply will result from a fully competitive energy market, which in turn would lower energy costs. Jobs and income would increase as a result of the growth in the sector. Diversification makes good economic and environmental sense. tabs., figs

  20. Basis for Interim Operation for Fuel Supply Shutdown Facility

    International Nuclear Information System (INIS)

    BENECKE, M.W.

    2003-01-01

    This document establishes the Basis for Interim Operation (BIO) for the Fuel Supply Shutdown Facility (FSS) as managed by the 300 Area Deactivation Project (300 ADP) organization in accordance with the requirements of the Project Hanford Management Contract procedure (PHMC) HNF-PRO-700, ''Safety Analysis and Technical Safety Requirements''. A hazard classification (Benecke 2003a) has been prepared for the facility in accordance with DOE-STD-1027-92 resulting in the assignment of Hazard Category 3 for FSS Facility buildings that store N Reactor fuel materials (303-B, 3712, and 3716). All others are designated Industrial buildings. It is concluded that the risks associated with the current and planned operational mode of the FSS Facility (uranium storage, uranium repackaging and shipment, cleanup, and transition activities, etc.) are acceptable. The potential radiological dose and toxicological consequences for a range of credible uranium storage building have been analyzed using Hanford accepted methods. Risk Class designations are summarized for representative events in Table 1.6-1. Mitigation was not considered for any event except the random fire event that exceeds predicted consequences based on existing source and combustible loading because of an inadvertent increase in combustible loading. For that event, a housekeeping program to manage transient combustibles is credited to reduce the probability. An additional administrative control is established to protect assumptions regarding source term by limiting inventories of fuel and combustible materials. Another is established to maintain the criticality safety program. Additional defense-in-depth controls are established to perform fire protection system testing, inspection, and maintenance to ensure predicted availability of those systems, and to maintain the radiological control program. It is also concluded that because an accidental nuclear criticality is not credible based on the low uranium enrichment

  1. Interim results from UO2 fuel oxidation tests in air

    International Nuclear Information System (INIS)

    Campbell, T.K.; Gilbert, E.R.; Thornhill, C.K.; White, G.D.; Piepel, G.F.; Griffin, C.W.j.

    1987-08-01

    An experimental program is being conducted at Pacific Northwest Laboratory (PNL) to extend the characterization of spent fuel oxidation in air. To characterize oxidation behavior of irradiated UO 2 , fuel oxidation tests were performed on declad light-water reactor spent fuel and nonirradited UO 2 pellets in the temperature range of 135 to 250 0 C. These tests were designed to determine the important independent variables that might affect spent fuel oxidation behavior. The data from this program, when combined with the test results from other programs, will be used to develop recommended spent fuel dry-storage temperature limits in air. This report describes interim test results. The initial PNL investigations of nonirradiated and spent fuels identified the important testing variables as temperature, fuel burnup, radiolysis of the air, fuel microstructure, and moisture in the air. Based on these initial results, a more extensive statistically designed test matrix was developed to study the effects of temperature, burnup, and moisture on the oxidation behavior of spent fuel. Oxidation tests were initiated using both boiling-water reactor and pressurized-water reactor fuels from several different reactors with burnups from 8 to 34 GWd/MTU. A 10 5 R/h gamma field was applied to the test ovens to simulate dry storage cask conditions. Nonirradiated fuel was included as a control. This report describes experimental results from the initial tests on both the spent and nonirradiated fuels and results to date on the tests in a 10 5 R/h gamma field. 33 refs., 51 figs., 6 tabs

  2. E-Area Performance Assessment Interim Measures Assessment FY2005

    Energy Technology Data Exchange (ETDEWEB)

    Stallings, M

    2006-01-31

    After major changes to the limits for various disposal units of the E-Area Low Level Waste Facility (ELLWF) last year, no major changes have been made during FY2005. A Special Analysis was completed which removes the air pathway {sup 14}C limit from the Intermediate Level Vault (ILV). This analysis will allow the disposal of reactor moderator deionizers which previously had no pathway to disposal. Several studies have also been completed providing groundwater transport input for future special analyses. During the past year, since Slit Trenches No.1 and No.2 were nearing volumetric capacity, they were operationally closed under a preliminary closure analysis. This analysis was performed using as-disposed conditions and data and showed that concrete rubble from the demolition of 232-F was acceptable for disposal in the STs even though the latest special analysis for the STs had reduced the tritium limits so that the inventory in the rubble exceeded limits. A number of special studies are planned during the next years; perhaps the largest of these will be revision of the Performance Assessment (PA) for the ELLWF. The revision will be accomplished by incorporating special analyses performed since the last PA revision as well as revising analyses to include new data. Projected impacts on disposal limits of more recent studies have been estimated. No interim measures will be applied during this year. However, it is being recommended that tritium disposals to the Components-in-Grout (CIG) Trenches be suspended until a limited Special Analysis (SA) currently in progress is completed. This SA will give recommendations for optimum placement of tritiated D-Area tower waste. Further recommendations for tritiated waste placement in the CIG Trenches will be given in the upcoming PA revision.

  3. THE IMPORTANCE OF FINANCIAL INTERIM REPORTING FOR THE POSITION OF COMPANIES

    Directory of Open Access Journals (Sweden)

    Claudia‐Elena\tGRIGORAȘ‐ICHIM

    2015-12-01

    Full Text Available The importance that each company must grant to the strategic sources of information generates our concern for analysis of the interim financial reporting. In every enterprise, there are doubts on the usefulness of interim financial reports, given the following elements: the necessary time for their preparation (relatively long, their restricted character and the resources necessary to establish them. Finding a common solution to these problems and, implicitly, increasing the interest for interim financial reporting, can help to increase the economic performance of the company, either by reducing the unnecessary costs related to time, or by increasing communication and transparency with third parties. An appropriate management can act early in the direction of counteracting the negative effects in their company or prevention of any commercial or production failures, the overall economic trends in that field and increasing productivity. Starting from these premises, we propose a research in order to capture the main aspects related to the mentioned issues.

  4. An allowable cladding peak temperature for spent nuclear fuels in interim dry storage

    Science.gov (United States)

    Cha, Hyun-Jin; Jang, Ki-Nam; Kim, Kyu-Tae

    2018-01-01

    Allowable cladding peak temperatures for spent fuel cladding integrity in interim dry storage were investigated, considering hydride reorientation and mechanical property degradation behaviors of unirradiated and neutron irradiated Zr-Nb cladding tubes. Cladding tube specimens were heated up to various temperatures and then cooled down under tensile hoop stresses. Cool-down specimens indicate that higher heat-up temperature and larger tensile hoop stress generated larger radial hydride precipitation and smaller tensile strength and plastic hoop strain. Unirradiated specimens generated relatively larger radial hydride precipitation and plastic strain than did neutron irradiated specimens. Assuming a minimum plastic strain requirement of 5% for cladding integrity maintenance in interim dry storage, it is proposed that a cladding peak temperature during the interim dry storage is to keep below 250 °C if cladding tubes are cooled down to room temperature.

  5. Environmental assessment for 881 Hillside (High Priority Sites) interim remedial action

    International Nuclear Information System (INIS)

    1990-01-01

    This Environmental Assessment evaluates the impact of an interim remedial action proposed for the High Priority Sites (881 Hillside Area) at the Rocky Flats Plant (RFP). This interim action is to be conducted to minimize the release of hazardous substances from the 881 Hillside Area that pose a potential long-term threat to public health and the environment. This document integrates current site characterization data and environmental analyses required by the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or ''Superfund'' process, into an environmental assessment pursuant to the National Environmental Policy Act (NEPA). Characterization of the 881 Hillside Area is continuing. Consequently, a final remedial action has not yet been proposed. Environmental impacts associated with the proposed interim remedial action and reasonable alternatives designed to remove organic and inorganic contaminants, including radionuclides, from alluvial groundwater in the 881 Hillside Area are addressed. 24 refs., 5 figs., 23 tabs

  6. The WFIRST Interim Design Reference Mission: Capabilities, Constraints, and Open Questions

    Science.gov (United States)

    Kruk, Jeffrey W.

    2012-01-01

    The Project Office and Science Definition Team for the Wide-Field Infrared Survey Telescope (WFIRST) are in the midst of a pre-Phase A study to establish a Design Reference Mission (DRM). An Interim report was released in June 2011, with a final report due later in 2012. The predicted performance of the Interim DRM Observatory will be described, including optical quality, observing efficiency, and sensitivity for representative observing scenarios. Observing constraints and other limitations on performance will also be presented, with an emphasis on potential Guest Observer programs. Finally, a brief status update will be provided on open trade studies of interest to the scientific community. The final DRM may differ from the Interim DRM presented here. However, the underlying requirements of the scientific programs are not expected to change, hence the capabilities of the IDRM are likely to be maintained even if the implementation changes in significant ways.

  7. Prognostic value of interim FDG PET/CT in Hodgkin's lymphoma patients treated with interim response-adapted strategy: comparison of International Harmonization Project (IHP), Gallamini and London criteria

    Energy Technology Data Exchange (ETDEWEB)

    Le Roux, Pierre-Yves; Querellou, Solene; Salaun, Pierre Yves [University Hospital of Brest, Department of Nuclear Medicine, Brest (France); Gastinne, Thomas; Le Gouill, Steven; Mahe, Beatrice; Dubruille, Viviane; Blin, Nicolas [University Hospital of Nantes, Department of Hematology, Nantes (France); Nowak, Emmanuel [INSERM CIC 05-02 IFR148, Brest (France); Bodet-Milin, Caroline; Bodere-Kraeber, Francoise [University Hospital of Nantes, Department of Nuclear Medicine, Nantes (France)

    2011-06-15

    Interim 2-[{sup 18}F]fluoro-2-deoxy-D-glucose positron emission tomography (FDG PET) has shown to be an accurate predictor of prognosis in Hodgkin's lymphoma (HL). However, FDG PET response criteria are a matter of ongoing debate. The aim of this study was to confirm the prognostic value of interim PET/CT in HL patients treated with an interim response-adapted strategy and to compare the respective performances of different published criteria. Newly diagnosed patients with HL underwent interim PET/CT after four courses of Adriamycin, bleomycin, vinblastine and dacarbazine (ABVD). The treatment strategy was adapted according to prognostic factors at diagnosis and interim PET/CT and CT results. PET images were prospectively interpreted visually: a negative result was defined as no residual uptake above local background. All other findings were considered as positive. Retrospectively, interim PET/CT was analysed according to International Harmonization Project (IHP), Gallamini and London criteria The analysis included 90 patients; 6 of 31 patients with positive interim PET/CT and 7 of 59 patients with negative interim result presented treatment failure. The negative predictive value (NPV) and positive predictive value (PPV) for predicting 2-year progression-free survival (PFS) was 95 and 16%, respectively. With the other criteria, NPV remained very high (from 95 to 96%). The PPV increased from 19 to 45% according to the threshold used. Interim PET/CT was significantly correlated with PFS with Gallamini (p = 0.01) and London criteria (p < 0.0001). Our study confirms the high NPV of interim PET/CT for predicting treatment outcome in HL and a probably better prognostic value using a higher threshold for positivity even after four cycles of chemotherapy as used in Gallamini and London criteria. (orig.)

  8. Dissecting Attending Surgeons' Operating Room Guidance: Factors That Affect Guidance Decision Making.

    Science.gov (United States)

    Chen, Xiaodong Phoenix; Williams, Reed G; Smink, Douglas S

    2015-01-01

    The amount of guidance provided by the attending surgeon in the operating room (OR) is a key element in developing residents' autonomy. The purpose of this study is to explore factors that affect attending surgeons' decision making regarding OR guidance provided to the resident. We used video-stimulated recall interviews (VSRI) throughout this 2-phase study. In Phase 1, 3 attending surgeons were invited to review separately 30 to 45 minute video segments of their prerecorded surgical operations to explore factors that influenced their OR guidance decision making. In Phase 2, 3 attending surgeons were observed and documented in the OR (4 operations, 341min). Each operating surgeon reviewed their videotaped surgical performance within 5 days of the operation to reflect on factors that affected their decision making during the targeted guidance events. All VSRI were recorded. Thematic analysis and manual coding were used to synthesize and analyze data from VSRI transcripts, OR observation documents, and field notes. A total of 255 minutes of VSRI involving 6 surgeons and 7 surgical operations from 5 different procedures were conducted. A total of 13 guidance decision-making influence factors from 4 categories were identified (Cohen's κ = 0.674): Setting (case schedule and patient morbidity), content (procedure attributes and case progress), resident (current competency level, trustworthiness, self-confidence, and personal traits), and attending surgeon (level of experience, level of comfort, preferred surgical technique, OR training philosophy, and responsibility as surgeon). A total of 5 factors (case schedule, patient morbidity, procedure attributes, resident current competency level, and trustworthiness) influenced attending surgeons' pre-OR guidance plans. "OR training philosophy" and "responsibility as surgeon" were anchor factors that affected attending surgeons' OR guidance decision-making patterns. Surgeons' OR guidance decision making is a dynamic process

  9. Early rehabilitation of facial defects using interim removable prostheses: A clinical case report

    Directory of Open Access Journals (Sweden)

    Vivekanandhan Ramkumar

    2013-01-01

    Full Text Available Surgical resection of neoplasms or malformations of the face may result in defects that are not amenable to immediate surgical reconstruction. Such defects can have a severe adverse effect on patient perceptions of body image and self-esteem. In these cases, the use of an interim removable facial prosthesis can offer a rapid alternative treatment solution. The patient may then resume social interactions more comfortably while permitting easy access to the facial defect to observe tissue healing while awaiting definitive rehabilitation. This article presents a case report describing the use of interim nasal prostheses to provide rapid patient rehabilitation of facial defects.

  10. 1988 Federal Interim Storage Fee study: A technical and economic analysis

    Energy Technology Data Exchange (ETDEWEB)

    1988-11-01

    This document is the latest in a series of reports that are published annually by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). The information in this report, which was prepared by E.R. Johnson Associates, Inc., under subcontract to PNL, will be used by the DOE to establish a payment schedule for interim storage of spent nuclear fuel under the Federal Interim Storage (FIS) Program. The FIS Program was mandated by the Nuclear Waste Policy Act of 1982. The information will be used to establish the schedule of charges for FIS services for the year commencing January 1, 1989. 13 refs.

  11. In vitro evaluation of the marginal integrity of CAD/CAM interim crowns.

    Science.gov (United States)

    Kelvin Khng, Kwang Yong; Ettinger, Ronald L; Armstrong, Steven R; Lindquist, Terry; Gratton, David G; Qian, Fang

    2016-05-01

    The accuracy of interim crowns made with computer-aided design and computer-aided manufacturing (CAD/CAM) systems has not been well investigated. The purpose of this in vitro study was to evaluate the marginal integrity of interim crowns made by CAD/CAM compared with that of conventional polymethylmethacrylate (PMMA) crowns. A dentoform mandibular left second premolar was prepared for a ceramic crown and scanned for the fabrication of 60 stereolithical resin dies, half of which were scanned to fabricate 15 Telio CAD-CEREC and 15 Paradigm MZ100-E4D-E4D crowns. Fifteen Caulk and 15 Jet interim crowns were made on the remaining resin dies. All crowns were cemented with Tempgrip under a 17.8-N load, thermocycled for 1000 cycles, placed in 0.5% acid fuschin for 24 hours, and embedded in epoxy resin before sectioning from the mid-buccal to mid-lingual surface. The marginal discrepancy was measured using a traveling microscope, and dye penetration was measured as a percentage of the overall length under the crown. The mean vertical marginal discrepancy of the conventionally made interim crowns was greater than for the CAD/CAM crowns (P=.006), while no difference was found for the horizontal component (P=.276). The mean vertical marginal discrepancy at the facial surface of the Caulk crowns was significantly greater than that of the other 3 types of interim crowns (Pcrowns was significantly larger than that of the other 3 types, with no difference at the lingual margins (P=.150). The mean percentage dye penetration for the Paradigm MZ100-E4D crowns was significantly greater and for Jet crowns significantly smaller than for the other 3 crowns (Pcrowns at the facial surface and with the horizontal marginal discrepancies of the Caulk interim crowns at the lingual surface (Pcrowns fabricated by CAD/CAM as compared with PMMA crowns; however, this difference was not observed for the horizontal component. The percentage dye penetration was correlated with vertical and horizontal

  12. Scientific criteria document for the development of an interim provincial water quality objective for aniline

    Energy Technology Data Exchange (ETDEWEB)

    Angelow, R.V.; Bazinet, N.

    1996-11-01

    The purpose of this document is to develop an interim provincial water quality objective for aniline for the protection of aquatic life in Ontario. It reviews the sources of aniline in the environment, its environmental fate and properties, acute and chronic toxicity as determined from results reported in the literature on toxicity tests using vertebrates and invertebrates, the bioaccumulation of aniline in the environment, mutagenic effects, and threshold aniline concentrations affecting fish odour and taste. The document then explains the derivation of the interim water quality objective. Water quality criteria for aniline developed in other jurisdictions are noted.

  13. Interim endodontic therapy for alveolar socket bone regeneration of infected hopeless teeth prior to implant therapy.

    Science.gov (United States)

    Rass, Marwan Abou

    2010-01-01

    The immediate placement of implants in the fresh extraction sockets of infected teeth with periradicular and periapical lesions is contraindicated because of both the infection and the loss of architecture required for proper implant placement. There are 4 approaches for implant replacement of a hopeless tooth with lesions: (1) extraction and delayed implant placement; (2) extraction, debridement, guided bone regeneration (GBR), guided tissue regeneration (GTR), and delayed implant placement; (3) extraction, intrasocket debridement, and immediate implant placement; or (4) extraction, debridement, GBR, GTR, and simultaneous implant placement. The extraction of such hopeless teeth often results in large bone and soft tissue defects that are difficult to repair. This article introduces an alternative approach: interim endodontic implant site preparation, defined as a transitional, surgical, or nonsurgical endodontic treatment to regenerate the hopeless tooth bone defects and prepare the site for proper implant placement. This article describes 3 distinct interim endodontic protocols used to manage 5 patients, all of whom had severely infected hopeless teeth with large lesions and were treatment planned for implant replacement: the first, interim nonsurgical endodontic treatment to restore the normal anatomy of the infected hopeless tooth; the second, interim surgical endodontics on the hopeless tooth with preexisting endodontic treatment to regenerate apical bone for primary implant stability, thus avoiding the involvement of the maxillary sinus and other critical anatomic structures; and the third, interim surgical endodontics on the hopeless tooth with preexisting endodontic treatment to confine the size of the osseous defect and simplify the GBR and GTR procedures. The outcome of interim endodontic treatment on these 5 patients demonstrated that tooth extraction would have been a less predictable approach. The interim treatment changed the overall direction of the

  14. EFFECT OF REHABILITATION DURING INTERIM STAY IN AALBORG MUNICIPALITY, DENMARK: A STUDY PROTOCOL

    DEFF Research Database (Denmark)

    Villumsen, Sidsel Maria Monrad; Villumsen, Morten

    2016-01-01

    Background: In the municipality of Aalborg, Denmark, the aim is to support citizens’ rehabilitation through training and learning in order to be self-reliant. This effort is supported at interim stays at the nursing homes [1]. A recent external report has outlined that citizen are highly satis ed...... are available in the systems, containing information on rehabilitation services rendered during interim stays. However, available data on the effect of the rehabilitation are currently unstructured in free-text, which impedes the assessment of rehabilitation effect and thereby the quality assurance. Objectives...

  15. Equal employment opportunity plan development guidance

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-09-01

    The purpose of this publication is to provide instructions for the development of EEO Plans for Fiscal Year 1979. It supplements the National EEO Plan for the Department of Energy issued in August 1978 (DOE/S-0002). The material included should be used immediately as guidance to develop, document, and implement subordinate echelon commitments to EEO. A schedule for the development and submission of EEO Plans is included. Most of the continuing requirements will be published at a later date as part of the directives system. Any comments or helpful suggestions concerned with the program outlined would be appreciated by the Office of Equal Opportunity.

  16. Environmental restoration value engineering guidance document

    International Nuclear Information System (INIS)

    1995-07-01

    This document provides guidance on Value Engineering (VE). VE is an organized team effort led by a person trained in the methodology to analyze the functions of projects, systems, equipment, facilities, services, and processes for achieving the essential functions at the lowest life cycle cost while maintaining required performance, reliability, availability, quality, and safety. VE has proven to be a superior tool to improve up-front project planning, cut costs, and create a better value for each dollar spent. This document forms the basis for the Environmental Restoration VE Program, describes the VE process, and provides recommendations on when it can be most useful on ER projects

  17. Avoiding plagiarism: guidance for nursing students.

    Science.gov (United States)

    Price, Bob

    The pressures of study, diversity of source materials, past assumptions relating to good writing practice, ambiguous writing guidance on best practice and students' insecurity about their reasoning ability, can lead to plagiarism. With the use of source checking software, there is an increased chance that plagiarised work will be identified and investigated, and penalties given. In extreme cases, plagiarised work may be reported to the Nursing and Midwifery Council and professional as well as academic penalties may apply. This article provides information on how students can avoid plagiarism when preparing their coursework for submission.

  18. Quality assurance plan for the Molten Salt Reactor Experiment Remediation Project at the Oak Ridge National Laboratory. Phase 1 -- Interim corrective measures and Phase 2 -- Purge and trap reactive gases

    International Nuclear Information System (INIS)

    1995-11-01

    This Quality Assurance Plan (QAP) identifies and describes the systems utilized by the Molten Salt Reactor Experiment Remediation Project (MSRERP) personnel to implement the requirements and associated applicable guidance contained in the Quality Program Description Y/QD-15 Rev. 2 (Energy Systems 1995f). This QAP defines the quality assurance (QA) requirements applicable to all activities and operations in and directly pertinent to the MSRERP Phase 1--Interim Corrective Measures and Phase 2--Purge and Trap objectives. This QAP will be reviewed, revised, and approved as necessary for Phase 3 and Phase 4 activities. This QAP identifies and describes the QA activities and procedures implemented by the various Oak Ridge National Laboratory support organizations and personnel to provide confidence that these activities meet the requirements of this project. Specific support organization (Division) quality requirements, including the degree of implementation of each, are contained in the appendixes of this plan

  19. Additional EIPC Study Analysis: Interim Report on High Priority Topics

    Energy Technology Data Exchange (ETDEWEB)

    Hadley, Stanton W [ORNL

    2013-11-01

    Between 2010 and 2012 the Eastern Interconnection Planning Collaborative (EIPC) conducted a major long-term resource and transmission study of the Eastern Interconnection (EI). With guidance from a Stakeholder Steering Committee (SSC) that included representatives from the Eastern Interconnection States Planning Council (EISPC) among others, the project was conducted in two phases. Phase 1 involved a long-term capacity expansion analysis that involved creation of eight major futures plus 72 sensitivities. Three scenarios were selected for more extensive transmission- focused evaluation in Phase 2. Five power flow analyses, nine production cost model runs (including six sensitivities), and three capital cost estimations were developed during this second phase. The results from Phase 1 and 2 provided a wealth of data that could be examined further to address energy-related questions. A list of 13 topics was developed for further analysis; this paper discusses the first five.

  20. Surface Water Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document for South Walnut Creek Basin (Operable Unit No. 2)

    International Nuclear Information System (INIS)

    1991-01-01

    The Department of Energy (DOE) is pursuing an Interim Measure/Interim Remedial Action (IM/IRA) at the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2) at the Rocky Flats Plant (RFP). This IM/IRA is to be conducted to minimize the release from these areas of hazardous substances that pose a potential threat to the public health and environment. The Plan involved the collection of contaminated surface water at specific locations, treatment by chemical precipitation, cross-flow membrane filtration and granular activated carbon (GAC) adsorption, and surface discharge of treated water. Information for the initial configuration of the Plan is presented in the document entitled ''Proposed Interim Measures/Interim Remedial Action Plan and Decision Document, 903 Pad, Mound, and East Trenches Areas, Operable Unit No. 2'' (IM/IRAP) dated 26 September 1990. Information concerning the proposed Surface Water IM/IRA was presented during a public meeting held from 7 to 10 p.m., Tuesday, 23 October 1990, at the Westminster City Park Recreation Center in Westminster, Colorado. This Responsiveness Summary presents DOE's response to all comments received at the public meeting, as well as those mailed to DOE during the public comment period which ended 24 November 1990. There were a number of technical comments on the plan that DOE has addressed herein. It is noted that several major issues were raised by the comments. Regardless of the estimated low risk to the public from construction and water transport activities, the popular sentiment of the public, based on comments received, is strong concern over worker and public health risks from these activities. In the light of public and municipal concerns, DOE proposes to eliminate from this IM/IRA the interbasin transfer of Woman Creek seepage to the South Walnut Creek drainage and to address collection and treatment of contaminated South Walnut Creek and Woman Creek surface water under two separate IM/IRAs