WorldWideScience

Sample records for integrated management initiative

  1. Integrated corridor management initiative : demonstration phase evaluation, Dallas air quality test plan.

    Science.gov (United States)

    2012-08-01

    This report presents the test plan for conducting the Air Quality Analysis for the United States : Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor : Management (ICM) Initiative Demonstration. The ICM proje...

  2. Integrated corridor management initiative : demonstration phase evaluation - Dallas technical capability analysis test plan.

    Science.gov (United States)

    This report presents the test plan for conducting the Technical Capability Analysis for the United States : Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor : Management (ICM) Initiative Demonstration. The ...

  3. Integrated corridor management initiative : demonstration phase evaluation, San Diego air quality test plan.

    Science.gov (United States)

    2012-08-01

    This report presents the test plan for conducting the Air Quality Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM projects being...

  4. Integrated corridor management initiative : demonstration phase evaluation, San Diego technical capability analysis test plan.

    Science.gov (United States)

    2012-08-01

    This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...

  5. Integrated landscape initiatives in Europe

    DEFF Research Database (Denmark)

    García-Martín, María; Bieling, Claudia; Hart, Abigail

    2016-01-01

    Landscapes are linked to human well-being in a multitude of ways, some of which are challenged by global market forces and traditional management approaches. In response to this situation there has been a rise in local initiatives to sustain the values of landscape. The aim of this paper is to pr......Landscapes are linked to human well-being in a multitude of ways, some of which are challenged by global market forces and traditional management approaches. In response to this situation there has been a rise in local initiatives to sustain the values of landscape. The aim of this paper...... searches and canvassing of European umbrella organisations; followed by an online survey of representatives from the identified initiatives (n??=??71). Our results show that the most relevant characteristics of integrated landscape initiatives in Europe are: a holistic approach to landscape management...

  6. M109 Family of Vehicles, Paladin Integrated Management (PIM): Operational Assessment of the Initial Operational Test and Evaluation (IOT and E)

    Science.gov (United States)

    2017-01-01

    Director, Operational Test and Evaluation M109 Family of Vehicles, Paladin Integrated Management (PIM) Operational Assessment of the... operational suitability, test adequacy, and survivability of the M109 Family of Vehicles (FoV), known as Paladin Integrated Management (PIM) Self...prevent the M109A7 SPH-equipped unit from completing its mission. The Paladin Integrated Management (PIM) Initial Operational Test and Evaluation

  7. The Integrated Coastal Area Management (ICAM) Initiative in the Nyali-Bamburi-Shanzu Site, Mombasa, Kenya.

    OpenAIRE

    Mwandotto, B.A.J.

    1997-01-01

    A multi-institutional planning team headed by Coast Development Authority (CDA) in Kenya initiated an Integrated Coastal Area Management (ICAM) process in 1994. The pilot study site was Nyali-Bamburi-Shanzu area in Mombasa. The objective was to provide a starting point for addressing urgent coastal issues facing the area and to enrich the dialogue on how to address urgent coastal management problems nationwide. The pertinent coastal issues that were profiled in a participatory and interactive...

  8. Technology Integration Initiative In Support of Outage Management

    Energy Technology Data Exchange (ETDEWEB)

    Gregory Weatherby; David Gertman

    2012-07-01

    Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Often, command and control during outages is maintained in the outage control center where many of the underlying technologies supporting outage control are the same as those used in the 1980’s. This research reports on the use of advanced integrating software technologies and hand held mobile devices as a means by which to reduce cycle time, improve accuracy, and enhance transparency among outage team members. This paper reports on the first phase of research supported by the DOE Light Water Reactor Sustainability (LWRS) Program that is performed in close collaboration with industry to examine the introduction of newly available technology allowing for safe and efficient outage performance. It is thought that this research will result in: improved resource management among various plant stakeholder groups, reduced paper work, and enhanced overall situation awareness for the outage control center management team. A description of field data collection methods, including personnel interview data, success factors, end-user evaluation and integration of hand held devices in achieving an integrated design are also evaluated. Finally, the necessity of obtaining operations cooperation support in field studies and technology evaluation is acknowledged.

  9. The Integration of Corporate Social Responsibility (CSR) Initiatives into Business Activities

    DEFF Research Database (Denmark)

    Knudsen, Jette Steen

    While proponents of Corporate Social Responsibility (CSR) have suggested that CSR initiatives should be integrated into mainstream business activities as ‘strategic CSR’ or ‘shared value’, research is lacking that explores how CSR initiatives are integrated in companies. This article compares CSR...... initiatives to human resource management (HRM) initiatives, which have a longer tradition of being integrated into company strategy. The focus is on gender diversity and CSR initiatives in a US multinational corporation (MNC). The MNC sees gender diversity as an integral part of business activities...

  10. Social initiative management: building social leaders

    Directory of Open Access Journals (Sweden)

    Carlos Eduardo Varejão Marinho

    2010-05-01

    Full Text Available Some programs of Social Initiative Management are designed to prepare managers to take over a new administrative challenge – the social manager. Such programs help companies to change their administrative policies in which managers are more concerned with ethics and social issues. The objective of this article is to present the basic principles for a new model of manager integrated into social programs, environment preservation and decision-making processes in the organization.

  11. Towards reframing health service delivery in Uganda: the Uganda Initiative for Integrated Management of Non-Communicable Diseases

    Directory of Open Access Journals (Sweden)

    Jeremy I. Schwartz

    2015-01-01

    Full Text Available Background: The burden of non-communicable diseases (NCDs in low- and middle-income countries (LMICs is accelerating. Given that the capacity of health systems in LMICs is already strained by the weight of communicable diseases, these countries find themselves facing a double burden of disease. NCDs contribute significantly to morbidity and mortality, thereby playing a major role in the cycle of poverty, and impeding development. Methods: Integrated approaches to health service delivery and healthcare worker (HCW training will be necessary in order to successfully combat the great challenge posed by NCDs. Results: In 2013, we formed the Uganda Initiative for Integrated Management of NCDs (UINCD, a multidisciplinary research collaboration that aims to present a systems approach to integrated management of chronic disease prevention, care, and the training of HCWs. Discussion: Through broad-based stakeholder engagement, catalytic partnerships, and a collective vision, UINCD is working to reframe integrated health service delivery in Uganda.

  12. Concept of operations : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-06-01

    This concept of operations (Con Ops) for the US-75 Integrated Corridor Management (ICM) Program has been developed as part of the US : Department of Transportation Integrated Corridor Management Initiative, which is an innovative research initiative ...

  13. Toward population management in an integrated care model.

    Science.gov (United States)

    Maddux, Franklin W; McMurray, Stephen; Nissenson, Allen R

    2013-01-01

    Under the Patient Protection and Affordable Care Act of 2010, accountable care organizations (ACOs) will be the primary mechanism for achieving the dual goals of high-quality patient care at managed per capita costs. To achieve these goals in the newly emerging health care environment, the nephrology community must plan for and direct integrated delivery and coordination of renal care, focusing on population management. Even though the ESRD patient population is a complex group with comorbid conditions that may confound integration of care, the nephrology community has unique experience providing integrated care through ACO-like programs. Specifically, the recent ESRD Management Demonstration Project sponsored by the Centers for Medicare & Medicaid Services and the current ESRD Prospective Payment System with it Quality Incentive Program have demonstrated that integrated delivery of renal care can be accomplished in a manner that provides improved clinical outcomes with some financial margin of savings. Moving forward, integrated renal care will probably be linked to provider performance and quality outcomes measures, and clinical integration initiatives will share several common elements, namely performance-based payment models, coordination of communication via health care information technology, and development of best practices for care coordination and resource utilization. Integration initiatives must be designed to be measured and evaluated, and, consistent with principles of continuous quality improvement, each initiative will provide for iterative improvements of the initiative. © 2013 S. Karger AG, Basel.

  14. The integration of corporate social responsibility (CSR) initiatives into business activities

    DEFF Research Database (Denmark)

    Knudsen, Jette Steen

    2013-01-01

    While proponents of corporate social responsibility (CSR) have suggested that CSR initiatives should be integrated into mainstream business activities as 'strategic CSR' or 'shared value', research is lacking that explores how CSR programmes are integrated in companies. This paper compares CSR...... initiatives with human resource management (HRM) activities, which have a longer tradition of being integrated into company strategy. The focus is on gender diversity and CSR in a US multinational corporation (MNC). The MNC sees gender diversity as an integral part of business activities. In contrast, the MNC...

  15. Enhancing patient engagement in chronic disease self-management support initiatives in Australia: the need for an integrated approach.

    Science.gov (United States)

    Jordan, Joanne E; Briggs, Andrew M; Brand, Caroline A; Osborne, Richard H

    2008-11-17

    Although emphasis on the prevention of chronic disease is important, governments in Australia need to balance this with continued assistance to the 77% of Australians reported to have at least one long-term medical condition. Self-management support is provided by health care and community services to enhance patients' ability to care for their chronic conditions in a cooperative framework. In Australia, there is a range of self-management support initiatives that have targeted patients (most notably, chronic disease self-management education programs) and health professionals (financial incentives, education and training). To date, there has been little coordination or integration of these self-management initiatives to enhance the patient-health professional clinical encounter. If self-management support is to work, there is a need to better understand the infrastructure, systems and training that are required to engage the key stakeholders - patients, carers, health professionals, and health care organisations. A coordinated approach is required in implementing these elements within existing and new health service models to enhance uptake and sustainability.

  16. Integrated resource management and recovery (IRMAR): a new danish initiative

    DEFF Research Database (Denmark)

    Astrup, Thomas Fruergaard; Scheutz, Charlotte; Damgaard, Anders

    DTU Environment has launched the IRMAR initiative in collaboration with internationally leading partners to improve the scientific basis for integrated assessment of both the quality of resources in waste and the environmental aspects of resource recovery. Today, the basis for prioritization...

  17. Managing harvest and habitat as integrated components

    Science.gov (United States)

    Osnas, Erik; Runge, Michael C.; Mattsson, Brady J.; Austin, Jane E.; Boomer, G. S.; Clark, R. G.; Devers, P.; Eadie, J. M.; Lonsdorf, E. V.; Tavernia, Brian G.

    2014-01-01

    In 2007, several important initiatives in the North American waterfowl management community called for an integrated approach to habitat and harvest management. The essence of the call for integration is that harvest and habitat management affect the same resources, yet exist as separate endeavours with very different regulatory contexts. A common modelling framework could help these management streams to better understand their mutual effects. Particularly, how does successful habitat management increase harvest potential? Also, how do regional habitat programmes and large-scale harvest strategies affect continental population sizes (a metric used to express habitat goals)? In the ensuing five years, several projects took on different aspects of these challenges. While all of these projects are still on-going, and are not yet sufficiently developed to produce guidance for management decisions, they have been influential in expanding the dialogue and producing some important emerging lessons. The first lesson has been that one of the more difficult aspects of integration is not the integration across decision contexts, but the integration across spatial and temporal scales. Habitat management occurs at local and regional scales. Harvest management decisions are made at a continental scale. How do these actions, taken at different scales, combine to influence waterfowl population dynamics at all scales? The second lesson has been that consideration of the interface of habitat and harvest management can generate important insights into the objectives underlying the decision context. Often the objectives are very complex and trade-off against one another. The third lesson follows from the second – if an understanding of the fundamental objectives is paramount, there is no escaping the need for a better understanding of human dimensions, specifically the desires of hunters and nonhunters and the role they play in conservation. In the end, the compelling question is

  18. Promoting Ethics and Integrity in Management Academic Research: Retraction Initiative.

    Science.gov (United States)

    Ayodele, Freida Ozavize; Yao, Liu; Haron, Hasnah

    2018-02-13

    In the management academic research, academic advancement, job security, and the securing of research funds at one's university are judged mainly by one's output of publications in high impact journals. With bogus resumes filled with published journal articles, universities and other allied institutions are keen to recruit or sustain the appointment of such academics. This often places undue pressure on aspiring academics and on those already recruited to engage in research misconduct which often leads to research integrity. This structured review focuses on the ethics and integrity of management research through an analysis of retracted articles published from 2005 to 2016. The study employs a structured literature review methodology whereby retracted articles published between 2005 and 2016 in the field of management science were found using Crossref and Google Scholar. The searched articles were then streamlined by selecting articles based on their relevance and content in accordance with the inclusion criteria. Based on the analysed retracted articles, the study shows evidence of ethical misconduct among researchers of management science. Such misconduct includes data falsification, the duplication of submitted articles, plagiarism, data irregularity and incomplete citation practices. Interestingly, the analysed results indicate that the field of knowledge management includes the highest number of retracted articles, with plagiarism constituting the most significant ethical issue. Furthermore, the findings of this study show that ethical misconduct is not restricted to a particular geographic location; it occurs in numerous countries. In turn, avenues of further study on research misconduct in management research are proposed.

  19. Polio Eradication Initiative contribution in strengthening immunization and integrated disease surveillance data management in WHO African region, 2014.

    Science.gov (United States)

    Poy, Alain; Minkoulou, Etienne; Shaba, Keith; Yahaya, Ali; Gaturuku, Peter; Dadja, Landoh; Okeibunor, Joseph; Mihigo, Richard; Mkanda, Pascal

    2016-10-10

    The PEI Programme in the WHO African region invested in recruitment of qualified staff in data management, developing data management system and standards operating systems since the revamp of the Polio Eradication Initiative in 1997 to cater for data management support needs in the Region. This support went beyond polio and was expanded to routine immunization and integrated surveillance of priority diseases. But the impact of the polio data management support to other programmes such as routine immunization and disease surveillance has not yet been fully documented. This is what this article seeks to demonstrate. We reviewed how Polio data management area of work evolved progressively along with the expansion of the data management team capacity and the evolution of the data management systems from initiation of the AFP case-based to routine immunization, other case based disease surveillance and Supplementary immunization activities. IDSR has improved the data availability with support from IST Polio funded data managers who were collecting them from countries. The data management system developed by the polio team was used by countries to record information related to not only polio SIAs but also for other interventions. From the time when routine immunization data started to be part of polio data management team responsibility, the number of reports received went from around 4000 the first year (2005) to >30,000 the second year and to >47,000 in 2014. Polio data management has helped to improve the overall VPD, IDSR and routine data management as well as emergency response in the Region. As we approach the polio end game, the African Region would benefit in using the already set infrastructure for other public health initiative in the Region. Copyright © 2016 The Authors. Published by Elsevier Ltd.. All rights reserved.

  20. Renewed mer model of integral management

    Directory of Open Access Journals (Sweden)

    Janko Belak

    2015-12-01

    Full Text Available Background: The research work on entrepreneurship, enterprise's policy and management, which started in 1992, successfully continued in the following years. Between 1992 and 2011, more than 400 academics and other researchers have participated in research work (MER research program whose main orientation has been the creation of their own model of integral management. Results: In past years, academics (researchers and authors of published papers from Austria, Belgium, Bosnia and Herzegovina, Bulgaria, Byelorussia, Canada, the Czech Republic, Croatia, Estonia, France, Germany, Hungary, Italy, Poland, Romania, Russia, the Slovak Republic, Slovenia, Switzerland, Ukraine, and the US have cooperated in MER programs, coming from more than fifty institutions. Thus, scientific doctrines of different universities influenced the development of the MER model which is based on both horizontal and vertical integration of the enterprises' governance and management processes, instruments and institutions into a consistently operating unit. Conclusions: The presented MER model is based on the multi-layer integration of governance and management with an enterprise and its environment, considering the fundamental desires for the enterprises' existence and, thus, their quantitative as well as qualitative changes. The process, instrumental, and institutional integrity of the governance and management is also the initial condition for the implementation of all other integration factors.

  1. Integrated corridor management : phase I, concept development and foundational research. Task 3.4, identify integrated corridor management institutional strategies and administration

    Science.gov (United States)

    2006-04-12

    Task 3 involves overall foundational research to further the understanding of various aspects of Integrated Corridor Management (ICM) and to identify integration issues needed to evaluate the feasibility of the ICM initiative. The focus of Task 3.4 a...

  2. Continuous improvement of the BNFL transport integrated management system

    International Nuclear Information System (INIS)

    Hale, J.A.

    1998-01-01

    The integrated Management System of BNFL Transport and Pacific Nuclear Transport Limited (PNTL) is subject to continuous improvement by the application of established improvement techniques adopted by BNFL. The technique currently being used is the application of a Total Quality Management (TQM) philosophy, involving the identification of key processes, benchmarking against existing measures, initiating various improvement projects and applying process changes within the Company. The measurement technique being used is based upon the European Foundation for Quality Management Model (EFQM). A major initiative was started in 1996 to include the requirements of the Environmental Management Systems standard ISO 14001 within the existing integrated management system. This resulted in additional activities added to the system, modification to some existing activities and additional training for personnel. The system was audited by a third party certification organisation, Lloyds Register Quality Assurance (LRQA), during 1997. This paper describes the arrangements to review and update the integrated management system of BNFL Transport and PNTL to include the requirements of the environmental standard ISO 14001 and it also discusses the continuous improvement process adopted by BNFL Transport. (authors)

  3. Multidisciplinary management--an opportunity for service integration.

    Science.gov (United States)

    Cameron, M

    1997-01-01

    The management team of the future will enter an environment requiring facilitation, participation, clinical, and empowerment skills. Those individuals who possess a clinical orientation as well as business expertise will be sought to manage multidisciplinary units. The rapid changes in the health-care environment have forced organizations to restructure their operations. To achieve quality care, customer satisfaction, cost-effectiveness, and efficiency, service integration across the organization will be required. As we approach the 21st century, this standard will evolve until "all levels are managing patient care." Some of the restructuring trends occurring in the health-care industry have been collaboration service integration, management consolidation, and job elimination. The emphasis for the multidisciplinary manager of the future will include integrating the professional and clinical services, managing information, building community partnerships, promoting physician collaboration, and managing the change process. A model organization in the next century will move toward a people-oriented system with inclusion and empowerment initiatives. Service integration will affect all organizations, but the disciplines within the Clinical Support System will be the most affected. Future opportunities of leadership will exist for pathologists, nurses, or medical technologists as the professional silos of managers and clinicians continue to crumble.

  4. US-75 ICM system as-built design : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2015-05-01

    This As-Built document for the US-75 Integrated Corridor Management (ICM) Program has been developed as part of the US Department of Transportation Integrated Corridor Management Initiative. The basic premise behind the ICM initiative is that indepen...

  5. Integrated, regional approach to risk management of industrial systems

    International Nuclear Information System (INIS)

    Chakraborty, S.

    1992-01-01

    This paper focuses on the following four main issues: (1) necessity for an integrated, regional approach to risk management of industrial systems; (2) principles of risk management; (3) integrated approach and overall methodology; and (4) implementation of risk management strategies on a regional basis. The U.N. Interagency project on risk management for large industrial areas, which is a pioneer type of international initiative for an integrated approach to risk management, is discussed in this context. Another encouraging activity for further development of overall methodologies for risk management is the ongoing project on the risk and safety of technical systems at the Swiss Federal Institute of Technology in Aurich. The concept of integral risk management takes into account multidimensional factors including technical, economic, political, social, and ethical considerations to allow a well-balanced decision-making process

  6. The interplay of management accounting research and NPM health initiatives

    DEFF Research Database (Denmark)

    Malmmose, Margit

    This paper investigates the development of management accounting research in the context of New Public Management (NPM) initiatives in health care. Drawing on concepts from diffusion theory and earlier literature reviews, the paper examines the interplay between management accounting research...... and health care reforms in relation to country of origin, development, theoretical approach, research method and topic. The study thus establishes a different focus; namely the interrelationship between the development of management accounting research and practical socio-political NPM innovations. The study...... shows that management accounting techniques are increasingly adopted in governmental health reforms and diffused across nations, themes and initiatives through time with the result that wider social practices become more and more integrated in management accounting research themes...

  7. Integrated management systems

    CERN Document Server

    Bugdol, Marek

    2015-01-01

    Examining the challenges of integrated management, this book explores the importance and potential benefits of using an integrated approach as a cross-functional concept of management. It covers not only standardized management systems (e.g. International Organization for Standardization), but also models of self-assessment, as well as different types of integration. Furthermore, it demonstrates how processes and systems can be integrated, and how management efficiency can be increased. The major part of this book focuses on management concepts which use integration as a key tool of management processes (e.g. the systematic approach, supply chain management, virtual and network organizations, processes management and total quality management). Case studies, illustrations, and tables are also provided to exemplify and illuminate the content, as well as examples of successful and failed integrations. Providing a particularly useful resource to managers and specialists involved in the improvement of organization...

  8. THE PLACE OF OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM IN THE INTEGRATED MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Piotr Kafel

    2016-06-01

    Full Text Available The purpose of this paper is to analyze the place of occupational health and safety management system (OHSMS within the integrated management system. Implementation aspects of management systems are discussed, namely the different management system standards used for registration, for example ISO 14001, ISO 9001, OHSAS 18001, ISO 27001, the order in which they were implemented, the time required for each implementation, as well as the scope of integration of these management system standards into a single Integrated Management System and the level of integration. In order to do so, some of the results of a survey carried out in 81 organizations registered to at least two management systems selected from popular international standards, e.g.: ISO 9001, ISO 14001, OHSAS 18001, ISO/IEC 27001, ISO 22000 were used. OHSMS is not the system that is implemented as a first one. Usually it is implemented after or simultaneously with ISO 9001 and ISO 14001 standards. Time of implementation of MSSs in second and further round of implementation is shorter than during the implementation of first standards. There is a higher level of integration of implemented management standards in organizations where one of the standards in OHSMS, than in a companies without OHSMS. The paper analyses those sequences of management systems implementation of safety management systems with other system, that allow organizations to achieve higher levels of integration and presents a possible pattern for the companies initiating the integration process.

  9. Integrating Environmental and Information Systems Management: An Enterprise Architecture Approach

    Science.gov (United States)

    Noran, Ovidiu

    Environmental responsibility is fast becoming an important aspect of strategic management as the reality of climate change settles in and relevant regulations are expected to tighten significantly in the near future. Many businesses react to this challenge by implementing environmental reporting and management systems. However, the environmental initiative is often not properly integrated in the overall business strategy and its information system (IS) and as a result the management does not have timely access to (appropriately aggregated) environmental information. This chapter argues for the benefit of integrating the environmental management (EM) project into the ongoing enterprise architecture (EA) initiative present in all successful companies. This is done by demonstrating how a reference architecture framework and a meta-methodology using EA artefacts can be used to co-design the EM system, the organisation and its IS in order to achieve a much needed synergy.

  10. 19 CFR 10.532 - Integrated Sourcing Initiative.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Integrated Sourcing Initiative. 10.532 Section 10... Trade Agreement Rules of Origin § 10.532 Integrated Sourcing Initiative. (a) For purposes of General... Sourcing Initiative if: (1) The good, in its condition as imported, is both classified in a tariff...

  11. Integrated therapy safety management system.

    Science.gov (United States)

    Podtschaske, Beatrice; Fuchs, Daniela; Friesdorf, Wolfgang

    2013-09-01

    The aim is to demonstrate the benefit of the medico-ergonomic approach for the redesign of clinical work systems. Based on the six layer model, a concept for an 'integrated therapy safety management' is drafted. This concept could serve as a basis to improve resilience. The concept is developed through a concept-based approach. The state of the art of safety and complexity research in human factors and ergonomics forms the basis. The findings are synthesized to a concept for 'integrated therapy safety management'. The concept is applied by way of example for the 'medication process' to demonstrate its practical implementation. The 'integrated therapy safety management' is drafted in accordance with the six layer model. This model supports a detailed description of specific work tasks, the corresponding responsibilities and related workflows at different layers by using the concept of 'bridge managers'. 'Bridge managers' anticipate potential errors and monitor the controlled system continuously. If disruptions or disturbances occur, they respond with corrective actions which ensure that no harm results and they initiate preventive measures for future procedures. The concept demonstrates that in a complex work system, the human factor is the key element and final authority to cope with the residual complexity. The expertise of the 'bridge managers' and the recursive hierarchical structure results in highly adaptive clinical work systems and increases their resilience. The medico-ergonomic approach is a highly promising way of coping with two complexities. It offers a systematic framework for comprehensive analyses of clinical work systems and promotes interdisciplinary collaboration. © 2013 The Authors. British Journal of Clinical Pharmacology © 2013 The British Pharmacological Society.

  12. Integrated nursery pest management

    Science.gov (United States)

    R. Kasten Dumroese

    2012-01-01

    What is integrated pest management? Take a look at the definition of each word to better understand the concept. Two of the words (integrated and management) are relatively straightforward. Integrated means to blend pieces or concepts into a unified whole, and management is the wise use of techniques to successfully accomplish a desired outcome. A pest is any biotic (...

  13. Integrating the radioactive waste management system into other management systems

    International Nuclear Information System (INIS)

    Silva, Ana Cristina Lourenco da; Nunes Neto, Carlos Antonio

    2007-01-01

    Radioactive waste management is to be included in the Integrated Management System (IMS) which pursues the continuous improvement of the company's quality, occupational safety and health, and environment protection processes. Radioactive waste management is based on the following aspects: optimization of human and material resources for execution of tasks, including the provision of a radiation protection supervisor to watch over the management of radioactive waste; improved documentation (management plan and procedures); optimization of operational levels for waste classification and release; maintenance of generation records and history through a database that facilitates traceability of information; implementation of radioactive waste segregation at source (source identification, monitoring and decontamination) activities intended to reduce the amount of radioactive waste; licensing of initial storage site for radioactive waste control and storage; employee awareness training on radioactive waste generation; identification and evaluation of emergency situations and response planning; implementation of preventive maintenance program for safety related items; development and application of new, advanced treatment methodologies or systems. These aspects are inherent in the concepts underlying quality management (establishment of administrative controls and performance indicators), environment protection (establishment of operational levels and controls for release), occupational health and safety (establishment of operational controls for exposure in emergency and routine situations and compliance with strict legal requirements and standards). It is noted that optimizing the addressed aspects of a radioactive waste management system further enhances the efficiency of the Integrated Management System for Quality, Environment, and Occupational Safety and Health. (author)

  14. Integral consideration of integrated management systems

    International Nuclear Information System (INIS)

    Frauenknecht, Stefan; Schmitz, Hans

    2010-01-01

    Aim of the project for the NPPs Kruemmel and Brunsbuettel (Vattenfall) is the integral view of the business process as basis for the implementation and operation of management systems in the domains quality, safety and environment. The authors describe the integral view of the business processes in the frame of integrated management systems with the focus nuclear safety, lessons learned in the past, the concept of a process-based controlling system and experiences from the practical realization.

  15. A European initiative to define research needs and foster the adoption of Managed Aquifer Recharge into river basin management

    Science.gov (United States)

    Kneppers, Angeline; Grützmacher, Gesche; Kazner, Christian; Zojer, Hans

    2010-05-01

    The European Technology Platform for Water (WssTP) was initiated by the European Commission to federate a highly fragmented sector with the aim to foster competitive innovations and promote sustainable solutions. To achieve this, pilot programmes endorsing a bottom-up approach were launched in 2007 with a variety of stakeholders having representative water issues to solve. Integrated Water Resources Management (IWRM) was adopted as a balancing process for the safe and sustainable development, allocation and monitoring of water resource use in the context of current and future social, economic and environmental objectives. As a result key drivers were selected and a methodology was followed to identify and validate the needs with stakeholders and experts, and demonstrate solutions as an integrated part of the river basin management plans. Managed Aquifer Recharge (MAR) was identified as a key component of integrated water resources management, especially in water scarce regions and an area relevant for further research. The paper shall summarize the process followed by the WssTP, initiating a Task Force with 36 representatives from European research institutes and industry partners with participation of a few international experts. During a workshop conducted in Graz in June 2009 these experts developed the basis for a report that has now been submitted to the European Commission for consideration in future research calls. Implementing IWRM and MAR is made difficult by the number of different water bodies, but also by the large number of stakeholders, policies, legislations and conflicting interests. The results of the MAR Task Force initiative set the basis for further discussions with the international MAR community on the relevance of the identified research needs but also on the importance and process to associate the institutional and managerial entities for capacity building and the adoption of MAR into the overall management strategies.

  16. Nuclear power plant Angra integrated enterprise management system

    International Nuclear Information System (INIS)

    Andrade, Ronaldo Barata de

    2009-01-01

    The characteristics and peculiarities of the Nuclear Power Plant ANGRA 3 enterprise, amongst which its technical complexity, the size of the project and of the supplies of goods and services contracted for for the Brazilian and foreign scopes, the variety of contractors and participants involved in the implementation, associated with the need of integrated management of all the activities of the enterprise, requires the setting of standardized criteria and procedures to be adopted by the enterprise Project Management Team and by all involved ELETRONUCLEAR (ETN) Units, Suppliers and Contractors for Brazilian and foreign goods and services for the execution of the activities related to overall enterprise planning. These criteria and procedures aim at covering the five Project Management Process Groups: Initiating Process Group, Planning Process Group, Execution Process Group, Monitoring and Controlling Process Group and Closing Process Group. For the ANGRA 3 enterprise, ETN developed the Integrated Enterprise Management System - INTEGRA, being the software 'Primavera Enterprise Project Management' a fundamental part of this system. The aim of this paper is to describe the main concepts involving the ANGRA 3 enterprise management, and the integration between the processes, including all disciplines in all phases of the enterprise life cycle, such as: Nuclear and Environmental Licensing, Infrastructure, National and Foreign Engineering, National and Import Supplies, Civil Works, Electromechanical Erection, Commissioning. (author)

  17. What it takes to get proactive: An integrative multilevel model of the antecedents of personal initiative.

    Science.gov (United States)

    Hong, Ying; Liao, Hui; Raub, Steffen; Han, Joo Hun

    2016-05-01

    Building upon and extending Parker, Bindl, and Strauss's (2010) theory of proactive motivation, we develop an integrated, multilevel model to examine how contextual factors shape employees' proactive motivational states and, through these proactive motivational states, influence their personal initiative behavior. Using data from a sample of hotels collected from 3 sources and over 2 time periods, we show that establishment-level initiative-enhancing human resource management (HRM) systems were positively related to departmental initiative climate, which was positively related to employee personal initiative through employee role-breadth self-efficacy. Further, department-level empowering leadership was positively related to initiative climate only when initiative-enhancing HRM systems were low. These findings offer interesting implications for research on personal initiative and for the management of employee proactivity in organizations. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  18. INTEGRATED SUSTAINABLE MANGROVE FOREST MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Cecep Kusmana

    2015-07-01

    Full Text Available Mangrove forest as a renewable resource must be managed based on sustainable basis in which the benefits of ecological, economic and social from the forest have to equity concern in achieving the optimum forest products and services in fulfill the needs of recent generation without destruction of future generation needs and that does not undesirable effects on the physical and social environment. This Sustainable Forest Management (SFM practices needs the supporting of sustainability in the development of social, economic and environment (ecological sounds simultaneously, it should be run by the proper institutional and regulations. In operational scale, SFM need integration in terms of knowledge, technical, consultative of stakeholders, coordination among sectors and other stakeholders, and considerations of ecological inter-relationship in which mangroves as an integral part of both a coastal ecosystem and a watershed (catchment area. Some tools have been developed to measure the performent of SFM, such as initiated by ITTO at 1992 and followed by Ministry of Forestry of Indonesia (1993, CIFOR (1995, LEI (1999, FSC (1999, etc., however, the true nuance of SFM’s performance is not easy to be measured. 

  19. Information Security Management - Part Of The Integrated Management System

    Science.gov (United States)

    Manea, Constantin Adrian

    2015-07-01

    The international management standards allow their integrated approach, thereby combining aspects of particular importance to the activity of any organization, from the quality management systems or the environmental management of the information security systems or the business continuity management systems. Although there is no national or international regulation, nor a defined standard for the Integrated Management System, the need to implement an integrated system occurs within the organization, which feels the opportunity to integrate the management components into a cohesive system, in agreement with the purpose and mission publicly stated. The issues relating to information security in the organization, from the perspective of the management system, raise serious questions to any organization in the current context of electronic information, reason for which we consider not only appropriate but necessary to promote and implement an Integrated Management System Quality - Environment - Health and Operational Security - Information Security

  20. Toward integrated design of waste management technologies

    International Nuclear Information System (INIS)

    Carnes, S.A.; Wolfe, A.K.

    1994-01-01

    Implementation of waste management technologies has been hindered by the intervention of diverse interests. Relying on a perceived history of inadequate and improper management, operations, and technological design, critics have stymied the implementation of scientifically and governmentally approved technologies and facilities, leading to a critical shortage of hazardous, mixed, and radioactive waste management capacity. The research and development (R ampersand D) required to identify technologies that are simultaneously (1) scientifically valid, (2) economically sound, and (3) publicly acceptable must necessarily address, in an integrated and interdisciplinary manner, these three criteria and how best to achieve the integration of stakeholders early in the technology implementation process (i.e., R ampersand D, demonstration, and commercialization). The goal of this paper is to initiate an identification of factors likely to render radioactive and hazardous waste management technologies publicly acceptable and to provide guidance on how technological R ampersand D might be revised to enhance the acceptability of alternative waste management technologies. Principal among these factors are the equitable distribution of costs, risks, and benefits of waste management policies and technologies, the equitable distribution of authority for making waste management policy and selecting technologies for implementation, and the equitable distribution of responsibility for resolving waste management problems. Stakeholder participation in assessing the likely distribution of these factors and mitigative mechanisms to enhance their equitable distribution, together with stakeholder participation in policy and technology R ampersand D, as informed by stakeholder assessments, should enhance the identification of acceptable policies and technologies

  1. Integrating fire management analysis into land management planning

    Science.gov (United States)

    Thomas J. Mills

    1983-01-01

    The analysis of alternative fire management programs should be integrated into the land and resource management planning process, but a single fire management analysis model cannot meet all planning needs. Therefore, a set of simulation models that are analytically separate from integrated land management planning models are required. The design of four levels of fire...

  2. Pipeline integrity management

    Energy Technology Data Exchange (ETDEWEB)

    Guyt, J.; Macara, C.

    1997-12-31

    This paper focuses on some of the issues necessary for pipeline operators to consider when addressing the challenge of managing the integrity of their systems. Topics are: Definition; business justification; creation and safeguarding of technical integrity; control and deviation from technical integrity; pipelines; pipeline failure assessment; pipeline integrity assessment; leak detection; emergency response. 6 figs., 3 tabs.

  3. Integrated Initiating Event Performance Indicators

    International Nuclear Information System (INIS)

    S. A. Eide; Dale M. Rasmuson; Corwin L. Atwood

    2005-01-01

    The U.S. Nuclear Regulatory Commission Industry Trends Program (ITP) collects and analyses industry-wide data, assesses the safety significance of results, and communicates results to Congress and other stakeholders. This paper outlines potential enhancements in the ITP to comprehensively cover the Initiating Events Cornerstone of Safety. Future work will address other cornerstones of safety. The proposed Tier 1 activity involves collecting data on ten categories of risk-significant initiating events, trending the results, and comparing early performance with prediction limits (allowable numbers of events, above which NRC action may occur). Tier 1 results would be used to monitor industry performance at the level of individual categories of initiating events. The proposed Tier 2 activity involves integrating the information for individual categories of initiating events into a single risk-based indicator, termed the Baseline Risk Index for Initiating Events or BRIIE. The BRIIE would be evaluated yearly and compared against a threshold. BRIIE results would be reported to Congress on a yearly basis

  4. Hawaii Utility Integration Initiatives to Enable Wind (Wind HUI) Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Dora Nakafuji; Lisa Dangelmaier; Chris Reynolds

    2012-07-15

    To advance the state and nation toward clean energy, Hawaii is pursuing an aggressive Renewable Portfolio Standard (RPS), 40% renewable generation and 30% energy efficiency and transportation initiatives by 2030. Additionally, with support from federal, state and industry leadership, the Hawaii Clean Energy Initiative (HCEI) is focused on reducing Hawaii's carbon footprint and global warming impacts. To keep pace with the policy momentum and changing industry technologies, the Hawaiian Electric Companies are proactively pursuing a number of potential system upgrade initiatives to better manage variable resources like wind, solar and demand-side and distributed generation alternatives (i.e. DSM, DG). As variable technologies will continue to play a significant role in powering the future grid, practical strategies for utility integration are needed. Hawaiian utilities are already contending with some of the highest penetrations of renewables in the nation in both large-scale and distributed technologies. With island grids supporting a diverse renewable generation portfolio at penetration levels surpassing 40%, the Hawaiian utilities experiences can offer unique perspective on practical integration strategies. Efforts pursued in this industry and federal collaborative project tackled challenging issues facing the electric power industry around the world. Based on interactions with a number of western utilities and building on decades of national and international renewable integration experiences, three priority initiatives were targeted by Hawaiian utilities to accelerate integration and management of variable renewables for the islands. The three initiatives included: Initiative 1: Enabling reliable, real-time wind forecasting for operations by improving short-term wind forecasting and ramp event modeling capabilities with local site, field monitoring; Initiative 2: Improving operators situational awareness to variable resources via real-time grid condition

  5. A Knowledge Management Approach to Support Software Process Improvement Implementation Initiatives

    Science.gov (United States)

    Montoni, Mariano Angel; Cerdeiral, Cristina; Zanetti, David; Cavalcanti da Rocha, Ana Regina

    The success of software process improvement (SPI) implementation initiatives depends fundamentally of the strategies adopted to support the execution of such initiatives. Therefore, it is essential to define adequate SPI implementation strategies aiming to facilitate the achievement of organizational business goals and to increase the benefits of process improvements. The objective of this work is to present an approach to support the execution of SPI implementation initiatives. We also describe a methodology applied to capture knowledge related to critical success factors that influence SPI initiatives. This knowledge was used to define effective SPI strategies aiming to increase the success of SPI initiatives coordinated by a specific SPI consultancy organization. This work also presents the functionalities of a set of tools integrated in a process-centered knowledge management environment, named CORE-KM, customized to support the presented approach.

  6. Integrated data management for RODOS

    International Nuclear Information System (INIS)

    Abramowicz, K.; Koschel, A.; Rafat, M.; Wendelgass, R.

    1995-12-01

    The report presents the results of a feasibility study on an integrated data organisation and management in RODOS, the real-time on-line decision support system for off-site nuclear emergency management. The conceptual design of the functional components of the integrated data management are described taking account of the software components and the operation environment of the RODOS system. In particular, the scheme architecture of a database integration manager for accessing and updating a multi-database system is discussed in detail under a variety of database management aspects. Furthermore, the structural design of both a simple knowledge database and a real-time database are described. Finally, some short comments on the benefits and disadvantages of the proposed concept of data integration in RODOS are given. (orig.) [de

  7. Financial incentives for disease management programmes and integrated care in German social health insurance.

    Science.gov (United States)

    Greb, Stefan; Focke, Axel; Hessel, Franz; Wasem, Jürgen

    2006-10-01

    As a result of recent health care reforms sickness funds and health care providers in German social health insurance face increased financial incentives for implementing disease management and integrated care. Sickness funds receive higher payments form the risk adjustment system if they set up certified disease management programmes and induce patients to enrol. If health care providers establish integrated care projects they are able to receive extra-budgetary funding. As a consequence, the number of certified disease management programmes and the number of integrated care contracts is increasing rapidly. However, contracts about disease management programmes between sickness funds and health care providers are highly standardized. The overall share of health care expenses spent on integrated care still is very low. Existing integrated care is mostly initiated by hospitals, is based on only one indication and is not fully integrated. However, opportunity to invest in integrated care may open up innovative processes, which generate considerable productivity gains. What is more, integrated care may serve as gateway for the introduction of more widespread selective contracting.

  8. Simplified risk model support for environmental management integration

    International Nuclear Information System (INIS)

    Eide, S.A.; Jones, J.L.; Wierman, T.E.

    1998-01-01

    This paper summarizes the process and results of human health risk assessments of the US Department of Energy (DOE) complex-wide programs for high-level waste, transuranic waste, low-level, mixed low-level waste, and spent nuclear fuel. The DOE baseline programs and alternatives for these five material types were characterized by disposition maps (material flow diagrams) and supporting information in the May 1997 report 'A Contractor Report to the Department of Energy on Environmental Baseline Programs and Integration Opportunities' (Discussion Draft). Risk analyses were performed using the Simplified Risk Model (SRM), developed to support DOE Environmental Management Integration studies. The SRM risk analyses consistently and comprehensively cover the life cycle programs for the five material types, from initial storage through final disposition. Risk results are presented at several levels: DOE complex-wide, material type program, individual DOE sites, and DOE site activities. The detailed risk results are documented in the February 1998 report 'Human Health Risk Comparisons for Environmental Management Baseline Programs and Integration Opportunities' (Discussion Draft)

  9. Samdrup Jongkhar Initiative : a Model of Integrated Ecologically ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Samdrup Jongkhar Initiative : a Model of Integrated Ecologically-friendly ... which endeavors to integrate social, economic, cultural and environmental objectives. ... Brown Cloud penetrates Bhutan : ambient air quality and trans-boundary ...

  10. The development and initial validation of the Countertransference Management Scale.

    Science.gov (United States)

    Pérez-Rojas, Andrés E; Palma, Beatriz; Bhatia, Avantika; Jackson, John; Norwood, Earta; Hayes, Jeffrey A; Gelso, Charles J

    2017-09-01

    Countertransference is an important aspect of the therapeutic relationship that exists in therapies of all theoretical orientations, and depending on how it is managed, it can either help or hinder treatment. Management of countertransference has been measured almost exclusively with the Countertransference Factors Inventory (Van Wagoner, Gelso, Hayes, & Diemer, 1991) and its variations, all of which focus on 5 therapist qualities theorized to facilitate management: self-insight, conceptualizing ability, empathy, self-integration, and anxiety management. Existing versions of the Countertransference Factors Inventory, however, possess certain psychometric limitations that appear to constrain how well they assess actual management of countertransference during a therapy session. We thus sought to develop a new measure that addressed these limitations and that captured the 5 therapist qualities as constituents (rather than correlates) of countertransference management that manifest in the treatment hour. The development and initial validation of the resulting 22-item Countertransference Management Scale (CMS) is described here. Exploratory factor analysis of ratings of 286 therapy supervisors of current supervisees indicated that the 5 constituents of countertransference management could be grouped into 2 correlated factors: "Understanding Self and Client" and "Self-Integration and Regulation." Evidence of convergent and criterion-related validity was supported by CMS total and subscale scores correlating as expected with measures of theoretically relevant constructs, namely, therapist countertransference behavior, theoretical framework, self-esteem, observing ego, empathic understanding, and tolerance of anxiety. Results also supported the internal consistency of the CMS and its subscales. Research, clinical, and training implications are discussed. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  11. Integrated Work Management: Overview, Course 31881

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Lewis Edward [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-06-30

    Integrated work management (IWM) is the process used for formally implementing the five-step process associated with integrated safety management (ISM) and integrated safeguards and security management (ISSM) at Los Alamos National Laboratory (LANL). IWM also directly supports the LANL Environmental Management System (EMS). IWM helps all workers and managers perform work safely and securely and in a manner that protects people, the environment, property, and the security of the nation. The IWM process applies to all work activities at LANL, from working in the office to designing experiments to assembling and detonating explosives. The primary LANL document that establishes and describes IWM requirements is Procedure (P) 300, Integrated Work Management.

  12. Implementation of the best in class project management and contract management initiative at the Department Of Energy's Office Of Environmental Management - 16062

    International Nuclear Information System (INIS)

    Van Camp, Scott G.; Stevenson, Jeremy S.; Deiters, Michael G.; Jamison, Timothy P.

    2009-01-01

    Since its creation in 1989, the Department of Energy (DOE), Office of Environmental Management (EM) has struggled with a legacy of inadequate project management and contract management. This has been manifested in recurring scope changes, cost overruns and schedule delays, and has been documented in multiple internal and external reviews. EM has committed itself to improving project performance and undertaken a number of proactive management initiatives including the development of a 'Best in Class' Project Management and Contract Management organization (i.e., the BICPM Initiative). During 2007, EM assessed the status of project management and contract management at 15 EM sites. These assessments evaluated strengths and weaknesses in 12 key project management capabilities and three contract management benchmarks. The January 2008 Compilation Assessment Report showed that EM faces significant challenges in its mission execution due to staffing shortages, project and contract management integration, insufficient project-oriented culture, and lack of a clear role for Headquarters in BICPM. EM then formulated a strategy to meet their objectives in the March 2008 Corporate Implementation Plan. It summarizes BICPM efforts, introduces the vision for BICPM, identifies the strategy for achieving BICPM, and describes a process for implementing BICPM. That is, it acts as a road-map to address EM's challenges. It also documents 18 Recommended Priority Actions (RPAs) that are the key to correcting these challenges. These RPAs provide a clear path forward that can be communicated to the entire EM organization and provide the foundation upon which a BICPM culture can be built. EM has since gained considerable momentum and progress towards institutionalizing BICPM. This paper provides a discussion of the BICPM Initiative and its implementation. (authors)

  13. Organizational Performance: Integration of the Value, Rarity, Imitability and Organization Framework in Project Management

    Directory of Open Access Journals (Sweden)

    Ronielton Rezende Oliveira

    2017-08-01

    Full Text Available Organizational performance is often associated with competitive advantage. In strategy studie saimed at expanding communication on a global vision of organizations and their initiatives, strategic project management stands out, whichis related to the mechanisms and set of management decisions that determine long term organizational performance. This study verify how the Resource-based view adds value to organizational initiatives seeking to achieve organizational performance through projects. The study considers strategic management practiced by the project managers o asto present a conceptual framework with four propositions that demonstrate the integration of the Value, Rarity, Imitability and Organization framework with project management and its relations to organizational performance.

  14. Successful integration of ergonomics into continuous improvement initiatives.

    Science.gov (United States)

    Monroe, Kimberly; Fick, Faye; Joshi, Madina

    2012-01-01

    Process improvement initiatives are receiving renewed attention by large corporations as they attempt to reduce manufacturing costs and stay competitive in the global marketplace. These initiatives include 5S, Six Sigma, and Lean. These programs often take up a large amount of available time and budget resources. More often than not, existing ergonomics processes are considered separate initiatives by upper management and struggle to gain a seat at the table. To effectively maintain their programs, ergonomics program managers need to overcome those obstacles and demonstrate how ergonomics initiatives are a natural fit with continuous improvement philosophies.

  15. Introducing Knowledge Management into the Integrated Management System of Nuclear Organizations

    International Nuclear Information System (INIS)

    Yanev, Y.; Brandner, A.; Kosilov, A.

    2016-01-01

    Full text: The analysis for introducing knowledge management into an integrated management system in nuclear organizations, conducted by NKMI, and discussed in a number of meetings in IAEA and other organizations has shown that currently there is no full and comprehensive implementation of KM in IMS. NKMI has suggested and developed a common, systematic approach for introducing Knowledge Management in the IMS of a nuclear regulatory organization, based on the concept of competence, graded approach and continuous improvement. The approach is based on the concept of integrating an initial review of all knowledge and competence needed for effective and efficient process implementation including a gap analysis and provision of compensatory measures. Knowledge resources are represented as a knowledge resource matrix, which are necessary to complete a given process successfully. The “performance” of the available knowledge resources contribute to an efficient regulatory process is also reviewed at the end of process implementation where relevant decision for enhancement of knowledge and competence are taken, including capturing, preserving, sharing and reuse of new knowledge, gained through the process implementation. The “knowledge resource matrix” approach is fully based on IAEA recommendation and has already been applied in a number of regulatory processes. (author

  16. Distribution Integrity Management Plant (DIMP)

    Energy Technology Data Exchange (ETDEWEB)

    Gonzales, Jerome F. [Los Alamos National Laboratory

    2012-05-07

    This document is the distribution integrity management plan (Plan) for the Los Alamos National Laboratory (LANL) Natural Gas Distribution System. This Plan meets the requirements of 49 CFR Part 192, Subpart P Distribution Integrity Management Programs (DIMP) for the LANL Natural Gas Distribution System. This Plan was developed by reviewing records and interviewing LANL personnel. The records consist of the design, construction, operation and maintenance for the LANL Natural Gas Distribution System. The records system for the LANL Natural Gas Distribution System is limited, so the majority of information is based on the judgment of LANL employees; the maintenance crew, the Corrosion Specialist and the Utilities and Infrastructure (UI) Civil Team Leader. The records used in this report are: Pipeline and Hazardous Materials Safety Administration (PHMSA) 7100.1-1, Report of Main and Service Line Inspection, Natural Gas Leak Survey, Gas Leak Response Report, Gas Leak and Repair Report, and Pipe-to-Soil Recordings. The specific elements of knowledge of the infrastructure used to evaluate each threat and prioritize risks are listed in Sections 6 and 7, Threat Evaluation and Risk Prioritization respectively. This Plan addresses additional information needed and a method for gaining that data over time through normal activities. The processes used for the initial assessment of Threat Evaluation and Risk Prioritization are the methods found in the Simple, Handy Risk-based Integrity Management Plan (SHRIMP{trademark}) software package developed by the American Pipeline and Gas Agency (APGA) Security and Integrity Foundation (SIF). SHRIMP{trademark} uses an index model developed by the consultants and advisors of the SIF. Threat assessment is performed using questions developed by the Gas Piping Technology Company (GPTC) as modified and added to by the SHRIMP{trademark} advisors. This Plan is required to be reviewed every 5 years to be continually refined and improved. Records

  17. INTEGRATING LMSs IN THE EDUCATIONAL PROCESS:Greek Teachers’ Initial Perceptions about LAMS

    Directory of Open Access Journals (Sweden)

    Spyros PAPADAKIS,

    2012-08-01

    Full Text Available E-learning with the use of Learning Management Systems, has been increasingly adopted in Primary, Secondary and Higher Education with the expectation to increase students’ motivation and infuse activity-centred learning strategies with various educational benefits. This study has investigated the initial perceptions of Greek teachers about the integration of LAMS, a Learning Activity Management System, in the educational praxis. Through a multifaceted research method, involving a small scale participatory action research, the research team attempted to investigate the preconditions required to integrate LAMS in the everyday lesson. Two tutorial workshops were organized with the participation of 46 educators from geographically diverse urban areas, from K-12 to Tertiary Education. Results indicated that teachers have developed a positive attitude towards LAMS and the use of collaborative online tools during the educational process. Although teachers have certain objections on integrating LMSs, which stem mainly from the current status of the Greek educational system, they accept relative advantages of integrating online collaborative approaches over the traditional face-to-face approach. Well-organized and carefully implemented tutorial workshops can spark teachers’ interest and bring about change in the educational process. Small scale interventions such as these can prove to foster dialogue among teachers of various backgrounds and set the foundations to create online communities of practice for innovative teachers.

  18. Integrated supply chain risk management

    OpenAIRE

    Riaan Bredell; Jackie Walters

    2007-01-01

    Integrated supply chain risk management (ISCRM) has become indispensable to the theory and practice of supply chain management. The economic and political realities of the modern world require not only a different approach to supply chain management, but also bold steps to secure supply chain performance and sustainable wealth creation. Integrated supply chain risk management provides supply chain organisations with a level of insight into their supply chains yet to be achieved. If correctly ...

  19. Integrated Work Management: PIC, Course 31884

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Lewis Edward [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-09-08

    The person-in-charge (PIC) plays a key role in the integrated work management (IWM) process at Los Alamos National Laboratory (LANL, or the Laboratory) because the PIC is assigned responsibility and authority by the responsible line manager (RLM) for the overall validation, coordination, release, execution, and closeout of a work activity in accordance with IWM. This course, Integrated Work Management: PIC (Course 31884), describes the PIC’s IWM roles and responsibilities. This course also discusses IWM requirements that the PIC must meet. For a general overview of the IWM process, see self-study Course 31881, Integrated Work Management: Overview. For instruction on the preparer’s role, see self-study Course 31883, Integrated Work Management: Preparer.

  20. Business process management and IT management: The missing integration

    DEFF Research Database (Denmark)

    Rahimi, Fatemeh; Møller, Charles; Hvam, Lars

    2016-01-01

    of IT on process innovations, the association between business process management and IT management is under-explored. Drawing on a literature analysis of the capabilities of business process and IT governance frameworks and findings from a case study, we propose the need for horizontal integration between the two......The importance of business processes and the centrality of IT to contemporary organizations' performance calls for a specific focus on business process management and IT management. Despite the wide scope of business process management covering both business and IT domains, and the profound impact...... management functions to enable strategic and operational business - IT alignment. We further argue that the role of IT in an organization influences the direction of integration between the two functions and thus the choice of integration mechanisms. Using case study findings, we propose...

  1. Integrated supply chain risk management

    Directory of Open Access Journals (Sweden)

    Riaan Bredell

    2007-11-01

    Full Text Available Integrated supply chain risk management (ISCRM has become indispensable to the theory and practice of supply chain management. The economic and political realities of the modern world require not only a different approach to supply chain management, but also bold steps to secure supply chain performance and sustainable wealth creation. Integrated supply chain risk management provides supply chain organisations with a level of insight into their supply chains yet to be achieved. If correctly applied, this process may optimise management decision-making and assist in the protection and enhancement of shareholder value.

  2. The French initiative for scientific cores virtual curating : a user-oriented integrated approach

    Science.gov (United States)

    Pignol, Cécile; Godinho, Elodie; Galabertier, Bruno; Caillo, Arnaud; Bernardet, Karim; Augustin, Laurent; Crouzet, Christian; Billy, Isabelle; Teste, Gregory; Moreno, Eva; Tosello, Vanessa; Crosta, Xavier; Chappellaz, Jérome; Calzas, Michel; Rousseau, Denis-Didier; Arnaud, Fabien

    2016-04-01

    Managing scientific data is probably one the most challenging issue in modern science. The question is made even more sensitive with the need of preserving and managing high value fragile geological sam-ples: cores. Large international scientific programs, such as IODP or ICDP are leading an intense effort to solve this problem and propose detailed high standard work- and dataflows thorough core handling and curating. However most results derived from rather small-scale research programs in which data and sample management is generally managed only locally - when it is … The national excellence equipment program (Equipex) CLIMCOR aims at developing French facilities for coring and drilling investigations. It concerns indiscriminately ice, marine and continental samples. As part of this initiative, we initiated a reflexion about core curating and associated coring-data management. The aim of the project is to conserve all metadata from fieldwork in an integrated cyber-environment which will evolve toward laboratory-acquired data storage in a near future. In that aim, our demarche was conducted through an close relationship with field operators as well laboratory core curators in order to propose user-oriented solutions. The national core curating initiative currently proposes a single web portal in which all scientifics teams can store their field data. For legacy samples, this will requires the establishment of a dedicated core lists with associated metadata. For forthcoming samples, we propose a mobile application, under Android environment to capture technical and scientific metadata on the field. This application is linked with a unique coring tools library and is adapted to most coring devices (gravity, drilling, percussion, etc...) including multiple sections and holes coring operations. Those field data can be uploaded automatically to the national portal, but also referenced through international standards or persistent identifiers (IGSN, ORCID and INSPIRE

  3. Integrated Work Management: FOD/RLM, Course 31882

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Lewis Edward [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-08-07

    The facility operations director (FOD) and responsible line manager (RLM) play leadership and functional roles in the integrated work management (IWM) process at Los Alamos National Laboratory (LANL). This course, Integrated Work Management: FOD/RLM (COURSE 31882), describes the IWM roles and responsibilities of the FOD and the RLM; it also discusses IWM requirements that must be met by the FOD and the RLM. Before taking this course, you may want to take COURSE 31881, Integrated Work Management: Overview. This self-study course would be particularly helpful if you are unfamiliar with the IWM process. You should also read Procedure (P) 300, Integrated Work Management. This course briefly covers the roles of the preparer and person in charge (PIC). For more in-depth instruction on the preparer’s role, see COURSE 31883, Integrated Work Management: Preparer. For instruction on the PIC’s role, see COURSE 31884, Integrated Work Management: PIC.

  4. Connecting the Dots Downunder Towards An Integrated Institutional Approach To Digital Content Management

    CERN Document Server

    Harboe-Ree, Cathrine

    2004-01-01

    There is a growing interest among academic institutions in managing institutional digital content produced in and for research, teaching and learning. This article argues for an integrated approach to this activity and examines the role of libraries in facilitating this. It then considers some existing approaches to providing software to support this. Australian initiatives consistent with this integrated model are then discussed.

  5. New mechanism under International Flood Initiative toward robustness for flood management in the Asia Pacific region

    Science.gov (United States)

    Murase, M.; Yoshitani, J.; Takeuchi, K.; Koike, T.

    2015-12-01

    Climate change is likely to result in increases in the frequency or intensity of extreme weather events. It is imperative that a good understanding is developed of how climate change affects the events that are reflected in hydrological extremes such as floods and how practitioners in water resources management deal with them. Since there is still major uncertainty as to how the impact of climate change affect actual water resources management, it is important to build robustness into management schemes and communities. Flood management under such variety of uncertainty favors the flexible and adaptive implementation both in top-down and bottom-up approaches. The former uses projections of global or spatially downscaled models to drive resource models and project resource impacts. The latter utilizes policy or planning tools to identify what changes in climate would be most threatening to their long-range operations. Especially for the bottom-up approaches, it is essential to identify the gap between what should be done and what has not been achieved for disaster risks. Indicators or index are appropriate tools to measure such gaps, but they are still in progress to cover the whole world. The International Flood Initiative (IFI), initiated in January 2005 by UNESCO and WMO in close cooperation with UNU and ISDR, IAHS and IAHR, has promoted an integrated approach to flood management to take advantage of floods and use of flood plains while reducing the social, environmental and economic risks. Its secretariat is located in ICHARM. The initiative objective is to support national platforms to practice evidence-based disaster risk reduction through mobilizing scientific and research networks at national, regional and international levels. The initiative is now preparing for a new mechanism to facilitate the integrated approach for flood management on the ground regionally in the Asia Pacific (IFI-AP) through monitoring, assessment and capacity building.

  6. Natural Resource Management Schemes as Entry Points for Integrated Landscape Approaches: Evidence from Ghana and Burkina Faso.

    Science.gov (United States)

    Foli, Samson; Ros-Tonen, Mirjam A F; Reed, James; Sunderland, Terry

    2017-04-20

    In recognition of the failures of sectoral approaches to overcome global challenges of biodiversity loss, climate change, food insecurity and poverty, scientific discourse on biodiversity conservation and sustainable development is shifting towards integrated landscape governance arrangements. Current landscape initiatives however very much depend on external actors and funding, raising the question of whether, and how, and under what conditions, locally embedded resource management schemes can serve as entry points for the implementation of integrated landscape approaches. This paper assesses the entry point potential for three established natural resource management schemes in West Africa that target landscape degradation with involvement of local communities: the Chantier d'Aménagement Forestier scheme encompassing forest management sites across Burkina Faso and the Modified Taungya System and community wildlife resource management initiatives in Ghana. Based on a review of the current literature, we analyze the extent to which design principles that define a landscape approach apply to these schemes. We found that the CREMA meets most of the desired criteria, but that its scale may be too limited to guarantee effective landscape governance, hence requiring upscaling. Conversely, the other two initiatives are strongly lacking in their design principles on fundamental components regarding integrated approaches, continual learning, and capacity building. Monitoring and evaluation bodies and participatory learning and negotiation platforms could enhance the schemes' alignment with integrated landscape approaches.

  7. Starting early: integration of self-management support into an acute stroke service.

    Science.gov (United States)

    Mäkelä, Petra; Gawned, Sara; Jones, Fiona

    2014-01-01

    Self-management support following stroke is rare, despite emerging evidence for impact on patient outcomes. The promotion of a common approach to self-management support across a stroke pathway requires collaboration between professionals. To date, the feasibility of self-management support in acute stroke settings has not been evaluated. The Bridges stroke self-management package (SMP) is based on self-efficacy principles. It is delivered by professionals and supported by a patient-held workbook. The aim of this project was to introduce the Bridges stroke SMP to the multidisciplinary staff of a London hyperacute and acute stroke unit. The 'Plan Do Study Act' (PDSA) cycle guided iterative stages of project development, with normalisation process theory helping to embed the intervention into existing ways of working. Questionnaires explored attitudes, beliefs and experiences of the staff who were integrating self-management support into ways of working in the acute stroke setting. Self-management support training was delivered to a total of 46 multidisciplinary stroke staff. Of the staff who attended the follow-up training, 66% had implemented Bridges self-management support with patients since initial training, and 100% felt their practice had changed. Questionnaire findings demonstrated that staff attitudes and beliefs had changed following training, particularly regarding ownership and type of rehabilitation goals set, and prioritisation of self-management support within acute stroke care. Staff initiated an audit of washing and dressing practices pre- and post-training. This was designed to evaluate the number of occasions when techniques were used by staff to facilitate patients' independence and self-management. They found that the number of occasions featuring optimum practice went from 54% at baseline to 63% at three months post-training. This project demonstrated the feasibility of integrating self-management support into an acute stroke setting. Further

  8. Configuration Management Program - a part of Integrated Management System

    International Nuclear Information System (INIS)

    Mancev, Bogomil; Yordanova, Vanja; Nenkova, Boyka

    2014-01-01

    The recently issued International Atomic Energy Agency (IAEA) publications (GS-R-3, GS-G-3.1 and GS-G-3.5) regarding Management Systems for Facilities and Activities define requirements for creation, introduction, evaluation and continuously improvement of the Management System, which unifies the safety, health, environment, security, quality and economic elements. According to GS-R-3 the Integrated Management System is based on defined processes identified in the enterprises: Managing, Basic and Supporting processes. At implementation of their activities, the organizations often apply other standards in their interrelations with suppliers and the parties concerned - ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007, regarding quality, environment and occupational health and safety management. The integration of the standards of both series ensure the observance of the common management principles that reflect the best practices of management as leadership, participation of the people, process approach, continuously improvement, systematical approach to the management and approach based on facts used at the making decisions. The main objective of the Integrated Management System introduction is to ensure safety considering the influence of all additional impacts taken together. The Integrated Management System is based on the process approach at implementation of the activities in nuclear power plant. The transition to the process oriented approach require long period of time, during which the distribution of the responsibilities is optimized up to the level that will satisfy the requirements, reach and maintain the stipulated objectives. The Configuration Management (CM) is an integrated management process by means of which conformity between design requirements, physical configuration and the plant documentation is ascertained and maintained during the entire life cycle of the facility. Processes within configuration management are not isolated, but are part of

  9. 10 CFR 473.22 - Initial review by manager.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Initial review by manager. 473.22 Section 473.22 Energy... Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.22 Initial review by manager. (a) Upon expiration of the time for filing information under these regulations, the manager shall— (1...

  10. INTEGRATIVE AUGMENTATION OF STANDARDIZED MANAGEMENT SYSTEMS

    Directory of Open Access Journals (Sweden)

    Stanislav Karapetrovic

    2008-03-01

    Full Text Available The development, features and integrating abilities of different international standards related to management systems are discussed. A group of such standards that augment the performance of quality management systems in organizations is specifically focused on. The concept, characteristics and an illustrative example of one augmenting standard, namely ISO 10001, are addressed. Integration of standardized augmenting systems, both by themselves and within the overall management system, is examined. It is argued that, in research and practice alike, integrative augmentation represents the future of standardized quality and other management systems.

  11. Tangible Results and Progress in Flood Risks Management with the PACTES Initiative

    Science.gov (United States)

    Costes, Murielle; Abadie, Jean-Paul; Ducuing, Jean-Louis; Denier, Jean-Paul; Stéphane

    The PACTES project (Prévention et Anticipation des Crues au moyen des Techniques Spatiales), initiated by CNES and the French Ministry of Research, aims at improving flood risk management, over the following three main phases : - Prevention : support and facilitate the analysis of flood risks and socio-economic impacts (risk - Forecasting and alert : improve the capability to predict and anticipate the flooding event - Crisis management : allow better situation awareness, communication and sharing of In order to achieve its ambitious objectives, PACTES: - integrates state-of-the-art techniques and systems (integration of the overall processing chains, - takes advantage of integrating recent model developments in wheather forecasting, rainfall, In this approach, space technology is thus used in three main ways : - radar and optical earth observation data are used to produce Digital Elevation Maps, land use - earth observation data are also an input to wheather forecasting, together with ground sensors; - satellite-based telecommunication and mobile positioning. Started in December 2000, the approach taken in PACTES is to work closely with users such as civil security and civil protection organisms, fire fighter brigades and city councils for requirements gathering and during the validation phase. It has lead to the development and experimentation of an integrated pre-operational demonstrator, delivered to different types of operational users. Experimentation has taken place in three watersheds representative of different types of floods (flash and plain floods). After a breaf reminder of what the PACTES project organization and aims are, the PACTES integrated pre-operational demonstrator is presented. The main scientific inputs to flood risk management are summarized. Validation studies for the three watersheds covered by PACTES (Moselle, Hérault and Thoré) are detailed. Feedback on the PACTES tangible results on flood risk management from an user point of view

  12. Improving safety in small enterprises through an integrated safety management intervention.

    Science.gov (United States)

    Kines, Pete; Andersen, Dorte; Andersen, Lars Peter; Nielsen, Kent; Pedersen, Louise

    2013-02-01

    This study tests the applicability of a participatory behavior-based injury prevention approach integrated with safety culture initiatives. Sixteen small metal industry enterprises (10-19 employees) are randomly assigned to receive the intervention or not. Safety coaching of owners/managers result in the identification of 48 safety tasks, 85% of which are solved at follow-up. Owner/manager led constructive dialogue meetings with workers result in the prioritization of 29 tasks, 79% of which are accomplished at follow-up. Intervention enterprises have significant increases on six of eight safety-perception-survey factors, while comparisons increase on only one factor. Both intervention and comparison enterprises demonstrate significant increases in their safety observation scores. Interview data validate and supplement these results, providing some evidence for behavior change and the initiation of safety culture change. Given that over 95% of enterprises in most countries have less than 20 employees, there is great potential for adapting this integrated approach to other industries. Copyright © 2012 National Safety Council and Elsevier Ltd. All rights reserved.

  13. Integral control for population management.

    Science.gov (United States)

    Guiver, Chris; Logemann, Hartmut; Rebarber, Richard; Bill, Adam; Tenhumberg, Brigitte; Hodgson, Dave; Townley, Stuart

    2015-04-01

    We present a novel management methodology for restocking a declining population. The strategy uses integral control, a concept ubiquitous in control theory which has not been applied to population dynamics. Integral control is based on dynamic feedback-using measurements of the population to inform management strategies and is robust to model uncertainty, an important consideration for ecological models. We demonstrate from first principles why such an approach to population management is suitable via theory and examples.

  14. INTEGRATED HSEQ MANAGEMENT SYSTEMS: DEVELOPMENTS AND TRENDS

    OpenAIRE

    Osmo Kauppila; Janne Härkönen; Seppo Väyrynen

    2015-01-01

    The integration of health and safety, environmental and quality (HSEQ) management systems has become a current topic in the 21st century, as the need for systems thinking has grown along with the number of management system standards. This study aims to map current developments and trends in integrated HSEQ management. Three viewpoints are taken: the current state of the main HSEQ management standards, research literature on integrated management systems (IMS), and a case study of an industry...

  15. Considerations on Integrating Risk and Quality Management

    Directory of Open Access Journals (Sweden)

    Maria POPESCU

    2011-03-01

    Full Text Available This paper aims to highlight the links between risk management and quality management and to study the possibility of their integrated approach. The study reviews the evolution of risk approach within organizations and stresses the need to increase the effectiveness of this approach by incorporating risk management methodology in the quality management system. Starting from this idea, the authors present the current state of risk approach into quality management, basic rules of integrated quality-risk management and major difficulties which may arise in the implementation of integrated quality–risk systems.

  16. Modular initiator with integrated optical diagnostic

    Science.gov (United States)

    Alam, M Kathleen [Cedar Crest, NM; Schmitt, Randal L [Tijeras, NM; Welle, Eric J [Niceville, FL; Madden, Sean P [Arlington, MA

    2011-05-17

    A slapper detonator which integrally incorporates an optical wavequide structure for determining whether there has been degradation of the explosive in the explosive device that is to be initiated by the detonator. Embodiments of this invention take advantage of the barrel-like character of a typical slapper detonator design. The barrel assembly, being in direct contact with the energetic material, incorporates an optical diagnostic device into the barrel assembly whereby one can monitor the state of the explosive material. Such monitoring can be beneficial because the chemical degradation of the explosive plays an important in achieving proper functioning of a detonator/initiator device.

  17. Intelligent Integrated System Health Management

    Science.gov (United States)

    Figueroa, Fernando

    2012-01-01

    Intelligent Integrated System Health Management (ISHM) is the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system (Management: storage, distribution, sharing, maintenance, processing, reasoning, and presentation). Presentation discusses: (1) ISHM Capability Development. (1a) ISHM Knowledge Model. (1b) Standards for ISHM Implementation. (1c) ISHM Domain Models (ISHM-DM's). (1d) Intelligent Sensors and Components. (2) ISHM in Systems Design, Engineering, and Integration. (3) Intelligent Control for ISHM-Enabled Systems

  18. Managing IT Integration Risk in Acquisitions

    DEFF Research Database (Denmark)

    Henningsson, Stefan; Kettinger, William J.

    2016-01-01

    The article discusses a framework for evaluating risk of information technology (IT) integration in acquisitions. Topics include the use of the experience of serial acquirer Trelleborg AB to show the merits of the framework for managing the risk and to determine low-risk acquisitions......, the importance of managing IT integration risk, and various risk areas for acquisition IT integration....

  19. Toward Integrated Resource Management: Lessons About the EcosystemApproach from the Laurentian Great Lakes

    Science.gov (United States)

    MACKENZIE

    1997-03-01

    / The ecosystem approach is an innovative tool for integratedresource management. Its goal is to restore, enhance, and protect ecosystemintegrity through a holistic and integrated mode of planning. Under thisapproach, the ecosystem itself becomes the unit of analysis and organizingprinciple for environmental management. Utilizing the ecosystem approachchallenges the prevailing structure and function of contemporary resourcemanagement agencies. This paper explores a number of important policy andmanagement issues in the context of a ten-year initiative to remediate theLaurentian Great Lakes using the ecosystem approach. The lessons gleaned fromthe Great Lakes experience are relevant to other areas in North America andabroad where resource management responsibilities are held by multiple andsometimes overlapping jurisdictions.KEY WORDS: Integrated resource management; Ecosystem approach; Watershedmanagement; Great Lakes

  20. Stakeholder initiatives in flood risk management

    NARCIS (Netherlands)

    Edelenbos, Jurian; Buuren, Van Arwin; Roth, Dik; Winnubst, Madelinde

    2017-01-01

    In recent years stakeholder participation has become a popular topic in flood management. Little is known about how and under which circumstances local stakeholders initiate and develop successful flood management strategies and how governmental actors respond to them. Drawing on theories of

  1. Effective integration of environmental leadership and environmental management systems within Cameco's Mining Division

    International Nuclear Information System (INIS)

    Nagy, K.; Borchardt, S.

    2010-01-01

    To support the implementation of its integrated Safety, Health, Environment & Quality (SHEQ) Policy, Cameco has undertaken an environmental leadership initiative with the goal of moving beyond regulatory compliance and significantly reducing environmental impacts in five key areas: air emissions, treated water quality and quantity, energy use and greenhouse gas emissions, and waste generation. To ensure environmental leadership becomes routine business practice, it was necessary to integrate the initiative into Cameco's programs and management systems at the corporate and operational levels. Operations-based environmental leadership strategies and action plans have since been developed, as well as a corporate reporting system to monitor Cameco's environmental performance. (author)

  2. Integrated parasite management

    DEFF Research Database (Denmark)

    Clausen, Jesper Hedegaard; Madsen, Henry; Van, Phan Thi

    2015-01-01

    communities at risk through mass drug administration. However, we argue that treatment alone will not reduce the risk from eating infected fish and that sustainable effective control must adopt an integrated FZT control approach based on education, infrastructure improvements, and management practices...... that target critical control points in the aquaculture production cycle identified from a thorough understanding of FZT and host biology and epidemiology. We present recommendations for an integrated parasite management (IPM) program for aquaculture farms.......Fishborne zoonotic trematodes (FZT) are an emerging problem and there is now a consensus that, in addition to wild-caught fish, fish produced in aquaculture present a major food safety risk, especially in Southeast Asia where aquaculture is important economically. Current control programs target...

  3. Integrated initial training program for a CEGB operations engineer

    International Nuclear Information System (INIS)

    Tompsett, P.A.

    1987-01-01

    This paper considers the overall training programs undertaken by a newly appointed Operations Engineer at one of the Central Electricity Generating Board's (CEGB) Advanced Gas Cooled Reactor (AGR) nuclear power stations. The training program is designed to equip him with the skills and knowledge necessary for him to discharge his duties safely and effectively. In order to assist the learning process and achieve and integrated program, aspects of reactor technology and operation, initially the subject of theoretical presentations at the CEGB's Nuclear Power Training Center (NPTC) are reinforced by either simulation and/or practical experience on site. In the later stages plant-specific simulators, operated by trained tutors, are incorporated into the training program to provide the trainee with practical experience of plant operation. The trainee's performance is assessed throughout the program to provide feedback to the trainee, the trainers and station management

  4. An Integrated Information System for Supporting Quality Management Tasks

    Science.gov (United States)

    Beyer, N.; Helmreich, W.

    2004-08-01

    In a competitive environment, well defined processes become the strategic advantage of a company. Hence, targeted Quality Management ensures efficiency, trans- parency and, ultimately, customer satisfaction. In the particular context of a Space Test Centre, a num- ber of specific Quality Management standards have to be applied. According to the revision of ISO 9001 dur- ing 2000, and due to the adaptation of ECSS-Q20-07, process orientation and data analysis are key tasks for ensuring and evaluating the efficiency of a company's processes. In line with these requirements, an integrated management system for accessing the necessary infor- mation to support Quality Management and other proc- esses has been established. Some of its test-related fea- tures are presented here. Easy access to the integrated management system from any work place at IABG's Space Test Centre is ensured by means of an intranet portal. It comprises a full set of quality-related process descriptions, information on test facilities, emergency procedures, and other relevant in- formation. The portal's web interface provides direct access to a couple of external applications. Moreover, easy updating of all information and low cost mainte- nance are features of this integrated information system. The timely and transparent management of non- conformances is covered by a dedicated NCR database which incorporates full documentation capability, elec- tronic signature and e-mail notification of concerned staff. A search interface allows for queries across all documented non-conformances. Furthermore, print ver- sions can be generated at any stage in the process, e.g. for distribution to customers. Feedback on customer satisfaction is sought through a web-based questionnaire. The process is initiated by the responsible test manager through submission of an e- mail that contains a hyperlink to a secure website, ask- ing the customer to complete the brief online form, which is directly fed to a database

  5. INTEGRATED HSEQ MANAGEMENT SYSTEMS: DEVELOPMENTS AND TRENDS

    Directory of Open Access Journals (Sweden)

    Osmo Kauppila

    2015-06-01

    Full Text Available The integration of health and safety, environmental and quality (HSEQ management systems has become a current topic in the 21st century, as the need for systems thinking has grown along with the number of management system standards. This study aims to map current developments and trends in integrated HSEQ management. Three viewpoints are taken: the current state of the main HSEQ management standards, research literature on integrated management systems (IMS, and a case study of an industry-led HSEQ cluster in Northern Finland. The results demonstrate that some of the most prominent current trends are the harmonization of the high level structure of management systems by ISO, the evaluation of IMS, accounting for the supply chain in HSEQ issues, and sustainability and risk management. The results of the study can be used by practitioners to get a view of the current state of HSEQ management systems and their integration, and by researchers to seek out potential directions for HSEQ and IMS related research.

  6. White Matter Integrity Pre- and Post Marijuana and Alcohol Initiation in Adolescence

    Directory of Open Access Journals (Sweden)

    Lindsay M. Squeglia

    2013-03-01

    Full Text Available Characterizing the effects of alcohol and marijuana use on adolescent brain development is important for understanding potential alterations in neurodevelopment. Several cross sectional studies have identified group differences in white matter integrity after initiation of heavy alcohol and marijuana use, however none have explored white matter trajectories in adolescents pre- and post initiation of use, particularly for marijuana users. This study followed 16 adolescents with minimal alcohol and marijuana use at ages 16–18 over three years. At follow-up, teens were 19–22 years old; half of the participants initiated heavy alcohol use and half initiated heavy alcohol and marijuana use. Repeated-measures ANOVA revealed 20 clusters in association and projection fibers tracts (p < 0.01 in which a group by time interaction was found. Most consistently, white matter integrity (i.e., fractional anisotropy decreased for those who initiated both heavy alcohol and marijuana use over the follow-up interval. No effect of time or change in white matter integrity was seen for those who initiated alcohol use only in the majority of clusters. In most regions, at the baseline time point, teens who would later initiate both alcohol and marijuana use demonstrated white matter integrity greater than or equal to teens that initiated alcohol use only. Findings suggest poorer tissue integrity associated with combined initiation of heavy alcohol and marijuana use in late adolescence. While pre-existing differences may also be related to likelihood of substance use, the present data suggest an effect on tissue integrity for these teens transitioning to combined alcohol and marijuana use in later adolescence.

  7. Hanford Tanks Initiative risk management guide

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1997-01-01

    This project-specific Risk Management Guide describes the general approach and process being used by the HTI Project to manage risk associated with execution of the HTI mission. It includes the initial identification of risk and the quantification of its likelihood and severity of its consequences. It further addresses the formulation of risk mitigation plans, periodic statusing of the Risk Management List, and risk closure

  8. Initial robotics research for environmental restoration and waste management

    International Nuclear Information System (INIS)

    Hamel, W.R.; Mann, R.C.

    1990-01-01

    This paper describes the initial research and development activities at the Oak Ridge National Laboratory (ORNL) that will support the technology development component of the overall National Robotics Technology Development Program (NRTDP). The NRTDP is a subelement of the US Department of Energy's (DOE's) Environmental Restoration and Waste Management (ER and WM) 5-Year Applied Research, Development, Demonstration, Testing, and Evaluation Plan and of overall efforts at DOE operational sites around the country. ORNL research will focus on fundamental improvement of remote manipulation through enhancements of the human man/machine interface, integration of automated functions, and the incorporation of machine intelligence to increase productivity. Background and goals for these activities are presented in this paper

  9. Management of area-wide integrated pest management programmes that integrate the sterile insect technique

    International Nuclear Information System (INIS)

    Dyck, V.A.; Vreysen, M.J.B.; Reyes Flores, J.; Regidor Fernandez, E.E.; Teruya, T.; Barnes, B.; Gomez Riera, P.; Lindquist, D.; Loosjes, M.

    2005-01-01

    Effective management of area-wide integrated pest management (AW-IPM) programmes that integrate the sterile insect technique (SIT) is key to success. Programme planning includes collection of baseline data and a feasibility assessment. The optimal management structure is where the programme can be implemented effectively and flexibly, independent of government politics, bureaucracy, and even corruption that impede timely goal achievement. Ideally, programmes include both public and private management, and require strong and steady financial support. Governments and donors are the most common sources of funds, but a mixture of public, community, and private funds is now the trend. Interrupted cash flow severely restrains programme performance. Physical support of programme operations must be reliable, and led by a maintenance professional. It is essential to have full-time, well-paid, and motivated staff led by a programme manger with technical and management experience. Programme failure is usually due to poor management and inadequate public support, and not to poor technology. (author)

  10. Integrated project management type contracts

    International Nuclear Information System (INIS)

    Heisler, S.I.

    1975-01-01

    The concept of integrated project management represents a single source to which the owner can turn for all project management functions excepting for those relating to outside parties such as site purchase, personnel selection etc. Other functions such as design, procurement, construction management, schedule and cost control, quality assurance/quality control are usually handled by the integrated project manager as the agent of the owner. The arrangement is flexible and the responsibilities can be varied to suit the size and experience of the owner. Past experience in the United States indicates an increase in the trend toward IPM work and it appears that overseas this trend is developing also. (orig./RW) [de

  11. An Integrated Care Initiative to Improve Patient Outcome in Schizophrenia.

    Science.gov (United States)

    Mayer-Amberg, Norbert; Woltmann, Rainer; Walther, Stefanie

    2015-01-01

    The optimal treatment of schizophrenia patients requires integration of medical and psychosocial inputs. In Germany, various health-care service providers and institutions are involved in the treatment process. Early and continuous treatment is important but often not possible because of the fragmented medical care system in Germany. The Integrated Care Initiative Schizophrenia has implemented a networked care concept in the German federal state of Lower Saxony that integrates various stakeholders of the health care system. In this initiative, office-based psychiatrists, specialized nursing staff, psychologists, social workers, hospitals, psychiatric institutional outpatient's departments, and other community-based mental health services work together in an interdisciplinary approach. Much emphasis is placed on psychoeducation. Additional efforts cover socio-therapy, visiting care, and family support. During the period from October 2010 (start of the initiative) to December 2012, first experiences and results of quality indicators were collected of 713 registered patients and summarized in a quality monitoring report. In addition, standardized patient interviews were conducted, and duration of hospital days was recorded in 2013. By the end of 2012, patients had been enrolled for an average of 18.7 months. The overall patient satisfaction measured in a patient survey in June 2013 was high and the duration of hospital days measured in a pre-post analysis in July 2013 was reduced by 44%. Two years earlier than planned, the insurance fund will continue the successfully implemented Integrated Care Initiative and adopt it in the regular care setting. This initiative can serve as a learning case for how to set up and measure integrated care systems that may improve outcomes for patients suffering from schizophrenia.

  12. Integrated crisis management exercises

    International Nuclear Information System (INIS)

    Callen, R.B.; DeHart, R.E.

    1994-01-01

    This paper describes some of the steps that Mobil has taken to enhance their crisis management capability and to improve their readiness. The approach stretches from the individual plant level to Mobil's Corporate offices in Fairfax, Virginia. Some of the lessons learned from several integrated crisis management exercises are outlined and some areas where additional industry co-operation in crisis management could pay dividends are suggested

  13. Marine Governance in a European context: Regionalization, integration and cooperation for ecosystem-based management

    NARCIS (Netherlands)

    Soma, K.; Tatenhove, van J.P.M.; Leeuwen, van J.

    2015-01-01

    New EU policy initiatives within the Maritime Strategy Framework Directive, the Integrated Maritime Policy, the reform of the Common Fisheries Policy, the offshore Energy policy and the Blue Growth Strategy, are in different manners aiming at implementing Ecosystem Based Management (EBM). EBM

  14. Integrated management of waterbirds: Beyond the conventional

    Science.gov (United States)

    Erwin, R.M.; Parsons, Katharine C.; Brown, Stephen C.; Erwin, R. Michael; Czech, Helen A.; Coulson, John C.

    2002-01-01

    Integrated waterbird management over the past few decades has implicitly referred to methods for managing wetlands that usually attempt to enhance habitat for taxonomic groups such as shorebirds and wading birds, in addition to waterfowl, the traditional focus group. Here I describe five elements of integration in management: taxonomic, spatial, temporal, population and habitat, and multiple-use management objectives. Spatial integration simply expands the scale of management concern. Rather than emphasizing management on a very limited number of impoundments or wetlands in small refuges or wildlife management areas, the vision is beginning to shift to connectivity within larger landscapes on the order of many square kilometers as telemetry data on daily and seasonal movements for many species become available. Temporal integration refers to the potential for either simultaneous management for waterbirds and commercial 'crops' (e.g., crayfish and rice) or for temporally-staggered management such as row crop production in spring-summer growing seasons and waterbird management on fallow fields in the non-growing (winter) season. Integrating population dynamics with habitats has become a major research focus over the past decade. Identifying which wetlands are ?sources? or ?sinks? for specific populations provides managers with critical information about effective management. Further, the applications of spatially explicit population models place heavy demands on researchers to identify use patterns for breeding and dispersing individuals by age, sex, and reproductive class. Population viability analysis models require much the same information. Finally, multiple-use management integration refers to trying to optimize the uses of wetlands, when only one (perhaps secondary) use may include waterbird management. Depending upon the ownership and primary land use of a particular parcel of land containing wetlands and/or water bodies, managing for waterbirds may be an

  15. Y-12 Integrated Materials Management System

    Energy Technology Data Exchange (ETDEWEB)

    Alspaugh, D. H.; Hickerson, T. W.

    2002-06-03

    The Integrated Materials Management System, when fully implemented, will provide the Y-12 National Security Complex with advanced inventory information and analysis capabilities and enable effective assessment, forecasting and management of nuclear materials, critical non-nuclear materials, and certified supplies. These capabilities will facilitate future Y-12 stockpile management work, enhance interfaces to existing National Nuclear Security Administration (NNSA) corporate-level information systems, and enable interfaces to planned NNSA systems. In the current national nuclear defense environment where, for example, weapons testing is not permitted, material managers need better, faster, more complete information about material properties and characteristics. They now must manage non-special nuclear material at the same high-level they have managed SNM, and information capabilities about both must be improved. The full automation and integration of business activities related to nuclear and non-nuclear materials that will be put into effect by the Integrated Materials Management System (IMMS) will significantly improve and streamline the process of providing vital information to Y-12 and NNSA managers. This overview looks at the kinds of information improvements targeted by the IMMS project, related issues, the proposed information architecture, and the progress to date in implementing the system.

  16. Integrated solid waste management in megacities

    Directory of Open Access Journals (Sweden)

    M.A. Abdoli

    2016-05-01

    Full Text Available Rapid urbanization and industrialization, population growth and economic growth in developing countries make management of municipal solid waste more complex comparing with developed countries. Furthermore, the conventional municipal solid waste management approach often is reductionists, not tailored to handle complexity. Therefore, the need to a comprehensive and multi-disciplinary approach regarding the municipal solid waste management problems is increasing. The concept of integrated solid waste management is accepted for this aim all over the world. This paper analyzes the current situation as well as opportunities and challenges regarding municipal solid waste management in Isfahan according to the integrated solid waste management framework in six aspects: environmental, political/legal, institutional, socio-cultural, financial/economic, technical and performance aspects. Based on the results obtained in this analysis, the main suggestions for future integrated solid waste management of Isfahan are as i promoting financial sustainability by taking the solid waste fee and reducing the expenses through the promoting source collection of recyclable materials, ii improving compost quality and also marketing the compost products simultaneously, iii promoting the private sector involvements throughout the municipal solid waste management system.

  17. Y-12 Integrated Materials Management System

    International Nuclear Information System (INIS)

    Alspaugh, D. H.; Hickerson, T. W.

    2002-01-01

    The Integrated Materials Management System, when fully implemented, will provide the Y-12 National Security Complex with advanced inventory information and analysis capabilities and enable effective assessment, forecasting and management of nuclear materials, critical non-nuclear materials, and certified supplies. These capabilities will facilitate future Y-12 stockpile management work, enhance interfaces to existing National Nuclear Security Administration (NNSA) corporate-level information systems, and enable interfaces to planned NNSA systems. In the current national nuclear defense environment where, for example, weapons testing is not permitted, material managers need better, faster, more complete information about material properties and characteristics. They now must manage non-special nuclear material at the same high-level they have managed SNM, and information capabilities about both must be improved. The full automation and integration of business activities related to nuclear and non-nuclear materials that will be put into effect by the Integrated Materials Management System (IMMS) will significantly improve and streamline the process of providing vital information to Y-12 and NNSA managers. This overview looks at the kinds of information improvements targeted by the IMMS project, related issues, the proposed information architecture, and the progress to date in implementing the system

  18. Advantages and Limitations of Integrated Management System: the Theoretical Viewpoint

    Directory of Open Access Journals (Sweden)

    Agota Giedrė Raišienė

    2013-08-01

    Full Text Available Purpose. The goal of the paper is to discuss the potential benefits and to highlight the drawbacks of integrated management system for organizations that seek to improve management process.Methodology. Methods of the research were used: analysis of a scientific and special literature that presents the requirements, models and results of integrated management systems studies, and analysis of statistical data to assess actuality of integrated management systems for enterprises in Lithuania.Findings. Summarizing research findings, it should be stated that the implementation of management system integration should be based on provision of social responsibility and holistic approach to the organization. It requires the long-term united efforts of leaders in a strategic hierarchical level and high organizational maturity to ensure the fluency of the running stages of planning management system integration, preparing documentations, implementing and realizing integrated management system. Also it is necessary to purify the conception of integrated management system in organizational context. Theoretical analysis of integrated management systems show, that all of the management systems can not be well integrated in principle. They can only be partly integrated and coordinated. A need to question the level of integration of management systems is very important as in scientific discourse as in practice. It is important to mark, that the number of organizations, that seek to optimize management processes by implementing the integrated management systems is rapidly increasing in Lithuania, too. It shows that benefit associated with integration of management systems is apprehensible in Lithuania. Advantages of integrated management systems can certainly become even stronger if scientists and practicians join their forces in search of methods of organizational management development.Research limitations. The research limitations related to a lack of

  19. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  20. Advantages and Limitations of Integrated Management System: the Theoretical Viewpoint

    Directory of Open Access Journals (Sweden)

    Agota Giedrė Raišienė

    2011-08-01

    Full Text Available Purpose. The goal of the paper is to discuss the potential benefits and to highlight the drawbacks of integrated management system for organizations that seek to improve management process.Methodology. Methods of the research were used: analysis of a scientific and special literature that presents the requirements, models and results of integrated management systems studies, and analysis of statistical data to assess actuality of integrated management systems for enterprises in Lithuania.Findings. Summarizing research findings, it should be stated that the implementation of management system integration should be based on provision of social responsibility and holistic approach to the organization. It requires the long-term united efforts of leaders in a strategic hierarchical level and high organizational maturity to ensure the fluency of the running stages of planning management system integration, preparing documentations, implementing and realizing integrated management system. Also it is necessary to purify the conception of integrated management system in organizational context. Theoretical analysis of integrated management systems show, that all of the management systems can not be well integrated in principle. They can only be partly integrated and coordinated. A need to question the level of integration of managementsystems is very important as in scientific discourse as in practice. It is important to mark, that the number of organizations, that seek to optimize management processes by implementing the integrated management systems is rapidly increasing in Lithuania, too. It shows that benefit associated with integration of management systems is apprehensible in Lithuania. Advantages of integrated management systems can certainly become even stronger if scientists and practicians join their forces in search of methods of organizational management development.Research limitations. The research limitations related to a lack of integrated

  1. The Overture Initiative Integrating Tools for VDM

    DEFF Research Database (Denmark)

    Larsen, Peter Gorm; Battle, Nick; Ferreira, Miguel

    2010-01-01

    Overture is a community-based initiative that aims to develop a common open-source platform integrating a range of tools for constructing and analysing formal models of systems using VDM. The mission is to both provide an industrial-strength tool set for VDM and also to provide an environment...

  2. An Integrated Care Initiative to Improve Patient Outcome in Schizophrenia

    Directory of Open Access Journals (Sweden)

    Norbert eMayer-Amberg

    2016-01-01

    Full Text Available The optimal treatment of schizophrenia patients requires integration of medical and psychosocial inputs. In Germany, various healthcare service providers and institutions are involved in the treatment process. Early and continuous treatment is important but often not possible because of the fragmented medical care system in Germany. The current work is a quality monitoring report of a novel care setting, called Integrated Care Initiative Schizophrenia. It has implemented a networked care concept in the German federal state of Lower Saxony that integrates various stakeholders of the health care system. In this initiative, office-based psychiatrists, specialised nursing staff, psychologists, social workers, hospitals, psychiatric institutional outpatient’s departments and other community-based mental health services work together in an interdisciplinary approach. Much emphasis is placed on psychoeducation. Additional efforts cover socio-therapy, visiting care, and family support. During the period from October 2010 (start of the initiative to December 2012, first experiences and results of quality indicators were collected of 713 registered patients and summarised in a quality monitoring report. In addition, standardised patient interviews were conducted, and duration of hospital days was recorded in 2013. By the end of 2012, patients had been enrolled for an average of 18.7 months. The overall patient satisfaction measured in a patient survey in June 2013 was high and the duration of hospital days measured in a pre-post analysis in July 2013 was reduced by 44%. Two years earlier than planned, the insurance fund will continue the successfully implemented integrated care initiative and adopt it in the regular care setting. This initiative can serve as a learning case for how to set up and measure integrated care systems that may improve outcomes for patients suffering from schizophrenia.

  3. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  4. Integrated management system

    International Nuclear Information System (INIS)

    Florescu, N.

    2003-01-01

    A management system is developed in order to reflect the needs of the business and to ensure that the objectives of the organization will be achieved. The process model and each individual process within the system then needs to identify the drives or requirements from external customers and stakeholders, regulations, and standards such as ISO and 50-C-Q. The processes are then developed to address these drivers. Developing the process in this way makes it fully integrated and capable of incorporating any new requirements. The International Standard (ISO 9000:2000) promotes the adoption of a process approach when developing, implementing and improving the effectiveness of a quality management system to enhance customer satisfaction by meeting customer requirements. The IAEA Code recognizes that the entire work is a process which can be planned, assessed and improved. For an organization to function effectively, numerous linked activities have to be identified and managed. By definition a process is an activity that using resources and taking into account all the constraints imposed executes the necessary operations which transform the inputs in outcomes. Running a system of processes within an organization, identification of the interaction between the processes and their management can be referred to as a 'process approach'. The advantage of such an approach is the ensuring of the ongoing control over the linkage between the individual processes composing the system as well as over their combination and interaction. Developing a management system implies: identification of the process which delivers Critical Success Factor (CSFs) of the business; identifying the support processes enabling the CSFs to be accomplished; identifying the processes that deliver the business fundamentals. An integrated management system should include all activities not only those related to Quality, Health and Safety. When developing an IMS it is necessary to identify all of the drivers

  5. Integrated Data Management Processes Expedite Common Data Management Tasks in Autism Research

    OpenAIRE

    Farach, Frank; Sinanis, Naralys; Hawthorne, Julie; Agnew, Henry; Schantz, Tricia; Jensen, Bill; Rozenblit, Leon

    2013-01-01

    We compare the efficiency of (1) just-in-time data management, in which data are cleaned prior to each analysis, and (2) integrated data management, in which data are centralized, cleaned up front, and made available via a query interface. Integrated data management was associated with faster completion of data management requests.

  6. Assessment and management of ecological integrity: Chapter 12

    Science.gov (United States)

    Kwak, Thomas J.; Freeman, Mary C.

    2010-01-01

    Assessing and understanding the impacts of human activities on aquatic ecosystems has long been a focus of ecologists, water resources managers, and fisheries scientists. While traditional fisheries management focused on single-species approaches to enhance fish stocks, there is a growing emphasis on management approaches at community and ecosystem levels. Of course, as fisheries managers shift their attention from narrow (e.g., populations) to broad organizational scales (e.g., communities or ecosystems), ecological processes and management objectives become more complex. At the community level, fisheries managers may strive for a fish assemblage that is complex, persistent, and resilient to disturbance. Aquatic ecosystem level objectives may focus on management for habitat quality and ecological processes, such as nutrient dynamics, productivity, or trophic interactions, but a long-term goal of ecosystem management may be to maintain ecological integrity. However, human users and social, economic, and political demands of fisheries management often result in a reduction of ecological integrity in managed systems, and this conflict presents a principal challenge for the modern fisheries manager. The concepts of biotic integrity and ecological integrity are being applied in fisheries science, natural resource management, and environmental legislation, but explicit definitions of these terms are elusive. Biotic integrity of an ecosystem may be defined as the capability of supporting and maintaining an integrated, adaptive community of organisms having a species composition, diversity, and functional organization comparable to that of a natural habitat of the region (Karr and Dudley 1981). Following that, ecological integrity is the summation of chemical, physical, and biological integrity. Thus, the concept of ecological integrity extends beyond fish and represents a holistic approach for ecosystem management that is especially applicable to aquatic systems. The

  7. Integrated Work Management: Preparer, Course 31883

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Lewis Edward [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-08-07

    The preparer (also called the “planner”) plays a key role in the integrated work management (IWM) process at Los Alamos National Laboratory (LANL). This course, Integrated Work Management: Preparer (COURSE 31883), describes the IWM roles and responsibilities of the preparer. This course also discusses IWM requirements that must be met by the preparer.

  8. Implementation of integrated management system

    International Nuclear Information System (INIS)

    Gaspar Junior, Joao Carlos A.; Fonseca, Victor Zidan da

    2007-01-01

    In present day exist quality assurance system, environment, occupational health and safety such as ISO9001, ISO14001 and OHSAS18001 and others standards will can create. These standards can be implemented and certified they guarantee one record system, quality assurance, documents control, operational control, responsibility definition, training, preparing and serve to emergency, monitoring, internal audit, corrective action, continual improvement, prevent of pollution, write procedure, reduce costs, impact assessment, risk assessment , standard, decree, legal requirements of municipal, state, federal and local scope. These procedure and systems when isolate applied cause many management systems and bureaucracy. Integration Management System reduce to bureaucracy, excess of documents, documents storage and conflict documents and easy to others standards implementation in future. The Integrated Management System (IMS) will be implemented in 2007. INB created a management group for implementation, this group decides planing, works, policy and advertisement. Legal requirements were surveyed, internal audits, pre-audits and audits were realized. INB is partially in accordance with ISO14001, OSHAS18001 standards. But very soon, it will be totally in accordance with this norms. Many studies and works were contracted to deal with legal requirements. This work have intention of show implementation process of ISO14001, OHSAS18001 and Integrated Management System on INB. (author)

  9. Improving integration for integrated coastal zone management: an eight country study.

    Science.gov (United States)

    Portman, M E; Esteves, L S; Le, X Q; Khan, A Z

    2012-11-15

    Integrated coastal zone management (ICZM) is a widely accepted approach for sustainable management of the coastal environment. ICZM emphasizes integration across sectors, levels of government, uses, stakeholders, and spatial and temporal scales. While improving integration is central to progress in ICZM, the role of and the achievement of integration remain understudied. To further study these two points, our research analyzes the performance of specific mechanisms used to support ICZM in eight countries (Belgium, India, Israel, Italy, Portugal, Sweden, UK, and Vietnam). The assessment is based on a qualitative comparative analysis conducted through the use of two surveys. It focuses on five ICZM mechanisms (environmental impact assessment; planning hierarchy; setback lines; marine spatial planning, and regulatory commission) and their role in improving integration. Our findings indicate that certain mechanisms enhance specific types of integration more effectively than others. Environmental impact assessment enhances science-policy integration and can be useful to integrate knowledge across sectors. Planning hierarchy and regulatory commissions are effective mechanisms to integrate policies across government levels, with the latter also promoting public-government integration. Setback lines can be applied to enhance integration across landscape units. Marine spatial planning is a multi-faceted mechanism with the potential to promote all types of integration. Policy-makers should adopt the mechanisms that are suited to the type of integration needed. Results of this study also contribute to evidence-based coastal management by identifying the most common impediments related to the mechanisms of integration in the eight studied countries. Copyright © 2012 Elsevier B.V. All rights reserved.

  10. Integrated environment, safety, and health management system description

    International Nuclear Information System (INIS)

    Zoghbi, J. G.

    2000-01-01

    The Integrated Environment, Safety, and Health Management System Description that is presented in this document describes the approach and management systems used to address integrated safety management within the Richland Environmental Restoration Project

  11. Integrated waste management - Looking beyond the solid waste horizon

    International Nuclear Information System (INIS)

    Seadon, J.K.

    2006-01-01

    Waste as a management issue has been evident for over four millennia. Disposal of waste to the biosphere has given way to thinking about, and trying to implement, an integrated waste management approach. In 1996 the United Nations Environmental Programme (UNEP) defined 'integrated waste management' as 'a framework of reference for designing and implementing new waste management systems and for analysing and optimising existing systems'. In this paper the concept of integrated waste management as defined by UNEP is considered, along with the parameters that constitute integrated waste management. The examples used are put into four categories: (1) integration within a single medium (solid, aqueous or atmospheric wastes) by considering alternative waste management options (2) multi-media integration (solid, aqueous, atmospheric and energy wastes) by considering waste management options that can be applied to more than one medium (3) tools (regulatory, economic, voluntary and informational) and (4) agents (governmental bodies (local and national), businesses and the community). This evaluation allows guidelines for enhancing success: (1) as experience increases, it is possible to deal with a greater complexity; and (2) integrated waste management requires a holistic approach, which encompasses a life cycle understanding of products and services. This in turn requires different specialisms to be involved in the instigation and analysis of an integrated waste management system. Taken together these advance the path to sustainability

  12. Integrated Computer System of Management in Logistics

    Science.gov (United States)

    Chwesiuk, Krzysztof

    2011-06-01

    This paper aims at presenting a concept of an integrated computer system of management in logistics, particularly in supply and distribution chains. Consequently, the paper includes the basic idea of the concept of computer-based management in logistics and components of the system, such as CAM and CIM systems in production processes, and management systems for storage, materials flow, and for managing transport, forwarding and logistics companies. The platform which integrates computer-aided management systems is that of electronic data interchange.

  13. Integrated management systems

    DEFF Research Database (Denmark)

    Jørgensen, Tine Herreborg; Remmen, Arne; Mellado, M. Dolores

    2006-01-01

    Different approaches to integration of management systems (ISO 9001, ISO 14001, OHSAS 18001 and SA 8000) with various levels of ambition have emerged. The tendency of increased compatibility between these standards has paved the road for discussions of, how to understand the different aspects of ...

  14. Modeling for Integrated Science Management and Resilient Systems Development

    Science.gov (United States)

    Shelhamer, M.; Mindock, J.; Lumpkins, S.

    2014-01-01

    Many physiological, environmental, and operational risks exist for crewmembers during spaceflight. An understanding of these risks from an integrated perspective is required to provide effective and efficient mitigations during future exploration missions that typically have stringent limitations on resources available, such as mass, power, and crew time. The Human Research Program (HRP) is in the early stages of developing collaborative modeling approaches for the purposes of managing its science portfolio in an integrated manner to support cross-disciplinary risk mitigation strategies and to enable resilient human and engineered systems in the spaceflight environment. In this talk, we will share ideas being explored from fields such as network science, complexity theory, and system-of-systems modeling. Initial work on tools to support these explorations will be discussed briefly, along with ideas for future efforts.

  15. Integrated Urban Water Quality Management

    DEFF Research Database (Denmark)

    Rauch, W.; Harremoës, Poul

    1995-01-01

    The basic features of integrated urban water quality management by means of deterministic modeling are outlined. Procedures for the assessment of the detrimental effects in the recipient are presented as well as the basic concepts of an integrated model. The analysis of a synthetic urban drainage...... system provides useful information for water quality management. It is possible to identify the system parameters that contain engineering significance. Continuous simulation of the system performance indicates that the combined nitrogen loading is dominated by the wastewater treatment plant during dry...

  16. Milestones in Implementation of an Integrated Management System in the Health Sector. Case Study Radiologische Netzwerk Rheinland

    Directory of Open Access Journals (Sweden)

    Claus Nagel-Picioruş

    2016-05-01

    Full Text Available Healthcare organizations in Germany exploit the benefits of the ISO 9000 family of international standards as it became compulsory to implement a quality management system in accordance with ISO 9001 requirements. Until the innovative ISO 9001:2015 proposal it was no direct connection to the other management systems like risk management, knowledge management or environmental management. So far, only few bodies ensured interconnections between different systems of management or associated the quality management system with the strategic planning process. However, healthcare encapsulates supplementary requirements which affect a number of different systems. Additionally, the financial crisis has encouraged the trend to operate integrated reporting beyond financial aspects. This paper aims at presenting the experience on the development of integrated management and reporting system integrated in an organization belonging to the health sector. The work clarifies the steps towards merging distinctly regulated management systems (quality, health or environmental management with strategic planning and controlling, via a Balanced Dashboard (Balanced Scorecard - BSC as well as integrated reporting according to the model International Integrated Reporting Initiative (IIRI in a German medical company - Radiologische Netzwerk Rheinland - RNR AG. Using the case study method, the paper's purpose is to highlight approaches and results of the company that could support practitioners from medical area and bezound. The literature review clarified theoretical concepts while the case study allowed converging comprehensive information and knowledge accumulated by RNR AG, thus helping to bridge the gap between literature on total integrated management reporting and reporting system in healthcare.

  17. Supply chain integration, risk management and manufacturing flexibility

    DEFF Research Database (Denmark)

    Chaudhuri, Atanu; Boer, Harry; Taran, Yariv

    2018-01-01

    , respectively, and manufacturing flexibility. Design/methodology/approach – Using hierarchical regression, data are analyzed from a sample of 343 manufacturing plants in Asia collected in 2013-2014 as part of the International Manufacturing Strategy Survey (IMSS VI). Findings – Internal integration and supply......Purpose – The purpose of this paper is to investigate the impact of internal integration, external integration and supply chain risk management on manufacturing flexibility, and the moderating effect of supply chain risk management on the relationships between internal and external integration...... chain risk management have a direct effect on manufacturing flexibility. Supply chain risk management moderates the relationship between external integration and flexibility. Research limitations/implications – Further research is needed to generalize beyond the flexibility performance of discrete...

  18. Research on monitoring and management information integration technique in waste treatment and management

    International Nuclear Information System (INIS)

    Kong Jinsong; Yu Ren; Mao Wei

    2013-01-01

    The integration of the waste treatment process and the device status monitoring information and management information is a key problem required to be solved in the information integration of the waste treatment and management. The main content of the monitoring and management information integration is discussed in the paper. The data exchange techniques, which are based on the OPC, FTP and data push technology, are applied to the different monitoring system respectively, according to their development platform, to realize the integration of the waste treatment process and device status monitoring information and management information in a waste treatment center. (authors)

  19. The integrity management cycle as a business process

    Energy Technology Data Exchange (ETDEWEB)

    Ackhurst, Trent B.; Peverelli, Romina P. [PIMS - Pipeline Integrity Management Specialists of London Ltd. (United Kingdom).

    2009-07-01

    It is a best-practice Oil and Gas pipeline integrity and reliability technique to apply integrity management cycles. This is conforms to the business principles of continuous improvement. This paper examines the integrity management cycle - both goals and objectives and subsequent component steps - from a business perspective. Traits that businesses require, to glean maximum benefit from such a cycle, are highlighted. A case study focuses upon an integrity and reliability process developed to apply to pipeline operators. installations. This is compared and contrasted to the pipeline integrity management cycle to underline both cycles. consistency with the principles of continuous improvement. (author)

  20. Integrated management systems in the nuclear field

    International Nuclear Information System (INIS)

    Beckmerhagen, I.A.; Berg, H.P.; Karapetrovic, S.V.; Willborn, W.O.

    2005-01-01

    In the last years several internationally accepted standards such as the ISO 9000 and ISO 14000 series and other function-specific management systems standards have been developed. At the same time, it has become imperative for organisations to continuously improve their overall quality, environmental and safety performance. Therefore, the need to create integrated management systems is of growing importance to enable an easier handling of the different management systems. This paper has two main objectives. The first one is to address the key issues in the underlying theory of integrated management systems including benefits and limits, the second one is to illustrate the importance of an integrated (in particular safety) management system and the experience feedback providing examples from different areas and different organisations in the nuclear field. (orig.)

  1. Climate change and integrated water resources management

    International Nuclear Information System (INIS)

    Bhuiyan, Nurul Amin

    2007-01-01

    Full text: Full text: In the Bangladesh Poverty Reduction Strategy (PRSP), Millennium Development Goals and other donor driven initiatives, two vital areas linked with poverty and ecosystem survival seem to be either missing or are being neglected: (a) transboundary water use and (b) coastal area poverty and critical ecosystems vulnerable due to climate change. Since the World Summit on Sustainable Development (WSSD) goals and PRSP are integrated, it is necessary that the countrys WSSD goals and PRSP should also be in harmony. All should give the recognition of Ganges Brahmaputra and Meghna as international basins and the approach should be taken for regional sustainable and integrated water resource management involving all co-riparian countries. The principle of low flow in the international rivers during all seasons should be ensured. All stakeholders should have a say and work towards regional cooperation in the water sector as a top priority. The energy sector should be integrated with water. The Indian River Linking project involving international rivers should be seriously discussed at all levels including the parliament so that voice of Bangladesh is concerted and information shared by all concerned. One of the most critical challenges Bangladesh faces is the management of water resources during periods of water excesses and acute scarcity. It is particularly difficult when only 7% of the catchments areas of the very international rivers, the Ganges, the Brahmaputra and the Meghna are in Bangladesh while 97% is outside Bangladesh where unfortunately, Bangladesh has no control on upstream diversion and water use. The UN Conference on Environment and Development in its Agenda 21 emphasizes the importance of Integrated Water Resource Management (IWRM). The core point of IWRM is that is development of all aspects of entire basin in a basin wide approach, that all relevant agencies of the government and water users must be involved in the planning process and

  2. Initiating Knowledge Management in Colleges and Universities: A template

    Directory of Open Access Journals (Sweden)

    Naresh Kumar Agarwal

    2014-12-01

    Full Text Available Knowledge Management (KM is a collaborative and integrated approach adopted at various levels to ensure that an organization’s knowledge assets are best utilized to increase organizational performance. While KM has been adopted in a large number of sectors and organizations, colleges and universities, and the higher education sector in general, is yet to take full advantage of the possibilities offered by KM. Also, while past research has sought to highlight the importance of implementing KM in higher education, there is a lack of a single, clear template for KM implementation that universities leaders and administrators can adopt. The contribution of the paper is a practical, actionable, step-by-step plan, as well as a diagrammatic, theoretical framework for initiating KM successfully in colleges and universities.

  3. Integrated tool for NPP lifetime management in Spain

    Energy Technology Data Exchange (ETDEWEB)

    Francia, L. [UNESA, Madrid (Spain); Lopez de Santa Maria, J. [ASCO-Vandellos 2 NPPs l' Hospitalet de l' Infant, Tarragona (Spain); Cardoso, A. [Tecnatom SA, Madrid (Spain)

    2001-07-01

    The project for the Integrated Nuclear Power Plant Lifetime Management System SIGEVI (Sistema Integrado de GEstion de VIda de Centrales Nucleares) was initiated in April 1998 and finalized in December 2000, the main objective of the project being to develop a computer application facilitating the assessment of the condition and lifetime of nuclear power plant components. This constituted the second phase of a further-reaching project on NPP Lifetime Management. During the first phase of this project, carried out between 1992 and 1995, the methodology and strategy for the lifetime management of the Spanish NPP's were developed. Among others, degradation phenomena were assessed and the most adequate methods for their monitoring were defined. The SIGEVI Project has been performed under the management of UNESA (Spanish Electricity Association) and with the collaboration of different engineering firms and research institutes (Tecnatom, Empresarios Agrupados, Ufisa, Initec and IIT), with Vandellos II as the pilot plant. The rest of the Spanish NPP's have also actively participated through the Project Steering Committee. The following sections describe the scope, the structure and the main functionalities of the system SIGEVI. (authors)

  4. Integrated tool for NPP lifetime management in Spain

    International Nuclear Information System (INIS)

    Francia, L.; Lopez de Santa Maria, J.; Cardoso, A.

    2001-01-01

    The project for the Integrated Nuclear Power Plant Lifetime Management System SIGEVI (Sistema Integrado de GEstion de VIda de Centrales Nucleares) was initiated in April 1998 and finalized in December 2000, the main objective of the project being to develop a computer application facilitating the assessment of the condition and lifetime of nuclear power plant components. This constituted the second phase of a further-reaching project on NPP Lifetime Management. During the first phase of this project, carried out between 1992 and 1995, the methodology and strategy for the lifetime management of the Spanish NPP's were developed. Among others, degradation phenomena were assessed and the most adequate methods for their monitoring were defined. The SIGEVI Project has been performed under the management of UNESA (Spanish Electricity Association) and with the collaboration of different engineering firms and research institutes (Tecnatom, Empresarios Agrupados, Ufisa, Initec and IIT), with Vandellos II as the pilot plant. The rest of the Spanish NPP's have also actively participated through the Project Steering Committee. The following sections describe the scope, the structure and the main functionalities of the system SIGEVI. (authors)

  5. Effective integration of environmental leadership and environmental management systems within Cameco's Mining Division

    Energy Technology Data Exchange (ETDEWEB)

    Nagy, K.; Borchardt, S., E-mail: kevin_nagy@cameco.com [Cameco Corp., Saskatoon, SK (Canada)

    2010-07-01

    To support the implementation of its integrated Safety, Health, Environment & Quality (SHEQ) Policy, Cameco has undertaken an environmental leadership initiative with the goal of moving beyond regulatory compliance and significantly reducing environmental impacts in five key areas: air emissions, treated water quality and quantity, energy use and greenhouse gas emissions, and waste generation. To ensure environmental leadership becomes routine business practice, it was necessary to integrate the initiative into Cameco's programs and management systems at the corporate and operational levels. Operations-based environmental leadership strategies and action plans have since been developed, as well as a corporate reporting system to monitor Cameco's environmental performance. (author)

  6. Integrated Risk Management Within NASA Programs/Projects

    Science.gov (United States)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  7. Integrating Climate and Ecosystem-Response Sciences in Temperate Western North American Mountains: The CIRMOUNT Initiative

    Science.gov (United States)

    Millar, C. I.; Fagre, D. B.

    2004-12-01

    Mountain regions are uniquely sensitive to changes in climate, vulnerable to climate effects on biotic and physical factors of intense social concern, and serve as critical early-warning systems of climate impacts. Escalating demands on western North American (WNA) mountain ecosystems increasingly stress both natural resources and rural community capacities; changes in mountain systems cascade to issues of national concern. Although WNA has long been a focus for climate- and climate-related environmental research, these efforts remain disciplinary and poorly integrated, hindering interpretation into policy and management. Knowledge is further hampered by lack of standardized climate monitoring stations at high-elevations in WNA. An initiative is emerging as the Consortium for Integrated Climate Research in Western Mountains (CIRMOUNT) whose primary goal is to improve knowledge of high-elevation climate systems and to better integrate physical, ecological, and social sciences relevant to climate change, ecosystem response, and natural-resource policy in WNA. CIRMOUNT seeks to focus research on climate variability and ecosystem response (progress in understanding synoptic scale processes) that improves interpretation of linkages between ecosystem functions and human processing (progress in understanding human-environment integration), which in turn would yield applicable information and understanding on key societal issues such as mountains as water towers, biodiversity, carbon forest sinks, and wildland hazards such as fire and forest dieback (progress in understanding ecosystem services and key thresholds). Achieving such integration depends first on implementing a network of high-elevation climate-monitoring stations, and linking these with integrated ecosystem-response studies. Achievements since 2003 include convening the 2004 Mountain Climate Sciences Symposium (1, 2) and several special sessions at technical conferences; initiating a biennial mountain climate

  8. Integrated Health Management Definitions

    Data.gov (United States)

    National Aeronautics and Space Administration — The Joint Army Navy NASA Air Force Modeling and Simulation Subcommittee's Integrated Health Management panel was started about 6 years ago to help foster...

  9. Integrated environmental zoning - An innovative Dutch approach to measuring and managing environmental spillovers in urban regions

    NARCIS (Netherlands)

    Miller, D.; de Roo, G.

    1996-01-01

    The Dutch development of Integrated Environmental Zoning is an advanced effort to account cumulatively for several environmental spillovers from manufacturing, and to manage their impacts on surrounding residential areas. This national policy initiative involves mapping the spatial patterns of

  10. Integrated Co-management of Lakes through Beach Management Units

    OpenAIRE

    Goverment of Uganda; Department for International Development (DFID) of the UK Government

    2007-01-01

    Metadata only record In 1999, the Integrated Co-management of Lakes through Beach Management Units project was started in an effort to implement a new approach to the management of lake resources in Uganda. The main components of this plan involved decentralization, local community management, and improving the livelihood of the poor. In order to finance the management of these areas, the Beach Management Units (BMU's) are charging user fees to those individuals who obtain benefit from the...

  11. Adaptive and integrated water management

    NARCIS (Netherlands)

    Pahl-Wostl, C.; Kabat, P.; Möltgen, J.

    2007-01-01

    Sustainable water management is a key environmental challenge of the 21st century. Developing and implementing innovative management approaches and how to cope with the increasing complexity and uncertainties was the theme of the first International Conference on Adaptive and Integrated Water

  12. Networking of integrated pest management

    NARCIS (Netherlands)

    Lamichhane, Jay Ram; Aubertot, Jean Noël; Begg, Graham; Birch, Andrew Nicholas E.; Boonekamp, Piet; Dachbrodt-Saaydeh, Silke; Hansen, Jens Grønbech; Hovmøller, Mogens Støvring; Jensen, Jens Erik; Jørgensen, Lise Nistrup; Kiss, Jozsef; Kudsk, Per; Moonen, Anna Camilla; Rasplus, Jean Yves; Sattin, Maurizio; Streito, Jean Claude; Messéan, Antoine

    2016-01-01

    Integrated pest management (IPM) is facing both external and internal challenges. External challenges include increasing needs to manage pests (pathogens, animal pests and weeds) due to climate change, evolution of pesticide resistance as well as virulence matching host resistance. The complexity

  13. Laboratory information management system for membrane protein structure initiative--from gene to crystal.

    Science.gov (United States)

    Troshin, Petr V; Morris, Chris; Prince, Stephen M; Papiz, Miroslav Z

    2008-12-01

    Membrane Protein Structure Initiative (MPSI) exploits laboratory competencies to work collaboratively and distribute work among the different sites. This is possible as protein structure determination requires a series of steps, starting with target selection, through cloning, expression, purification, crystallization and finally structure determination. Distributed sites create a unique set of challenges for integrating and passing on information on the progress of targets. This role is played by the Protein Information Management System (PIMS), which is a laboratory information management system (LIMS), serving as a hub for MPSI, allowing collaborative structural proteomics to be carried out in a distributed fashion. It holds key information on the progress of cloning, expression, purification and crystallization of proteins. PIMS is employed to track the status of protein targets and to manage constructs, primers, experiments, protocols, sample locations and their detailed histories: thus playing a key role in MPSI data exchange. It also serves as the centre of a federation of interoperable information resources such as local laboratory information systems and international archival resources, like PDB or NCBI. During the challenging task of PIMS integration, within the MPSI, we discovered a number of prerequisites for successful PIMS integration. In this article we share our experiences and provide invaluable insights into the process of LIMS adaptation. This information should be of interest to partners who are thinking about using LIMS as a data centre for their collaborative efforts.

  14. Pipeline four-dimension management is the trend of pipeline integrity management in the future

    Energy Technology Data Exchange (ETDEWEB)

    Shaohua, Dong; Feifan; Zhongchen, Han [China National Petroleum Corporation (CNPC), Beijing (China)

    2009-07-01

    Pipeline integrity management is essential for today's operators to operate their pipelines safety and cost effectively. The latest developments of pipeline integrity management around the world are involved with change of regulation, industry standard and innovation of technology. And who know the trend of PIM in the future, which can be answered in the paper. As a result, the concept of P4DM was set up firstly in the world. The paper analyzed the pipeline HSE management, pipeline integrity management (PIM) and asset integrity management (AIM), the problem of management was produced, and also the Pipeline 4-dimension Management (P4DM) theory was brought forward. According to P4DM, from the hierarchy of P4DM, the management elements, fields, space and time was analyzed. The main content is P4DM integrate the space geography location and time, control and manage the pipeline system in whole process, anywhere and anytime. It includes the pipeline integrity, pipeline operation and emergency, which is integrated by IT system. It come true that the idea, solution, technology, organization, manager alternately intelligently control the process of management. What the paper talks about included the definition of pipeline 4D management, the research develop of P4DM, the theory of P4DM, the relationship between P4DM and PIM, the technology basis of P4DM, how to perform the P4DM and conclusion. The P4DM was produced, which provide the development direction of PIM in the future, and also provide the new ideas for PetroChina in the field of technology and management. (author)

  15. PENATAAN RUANG LAUT BERDASARKAN INTEGRATED COASTAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Dina Sunyowati

    2008-10-01

    Full Text Available The planning of coastal spatial arrangement must be put in the valid spatial planning system. Law Number 26 of 2007 on Spatial Planning and it is in fact related with land spatial planning, although that ocean and air spatial management will be arranged in separate law. The legal for coastal zone management is determined by using the principles of integrated coastal management by focusing on area or zone authority system. The integrated of coastal zones management regulations should be followed by the planning of coastal spatial arrange­ment. Therefore, certain synchronization at coastal zones governance is very important issue since by integrating and coordinating other related regulations and therefore conflict of norm can be minimized in the spatial planning coastal zone.

  16. [Integrated management of patients with schizophrenia: beyond psychotropic drugs].

    Science.gov (United States)

    Taborda Zapata, Eliana; Montoya Gonzalez, Laura Elisa; Gómez Sierra, Natalia María; Arteaga Morales, Laura María; Correa Rico, Oscar Andrés

    2016-01-01

    Schizophrenia is a complex disease with severe functional repercussions; therefore it merits treatment which goes beyond drugs. It requires an approach that considers a diathesis-stress process that includes rehabilitation, psychotherapeutic strategies for persistent cognitive, negative and psychotic symptoms, psychoeducation of patient and communities, community adaptation strategies, such as the introduction to the work force, and the community model, such as a change in the asylum paradigm. It is necessary to establish private and public initiatives for the integrated care of schizophrenia in the country, advocating the well-being of those with the disease. The integrated management of schizophrenic patients requires a global view of the patient and his/her disease, and its development is essential. Copyright © 2015 Asociación Colombiana de Psiquiatría. Publicado por Elsevier España. All rights reserved.

  17. Knowledge and information management for integrated water resource management

    Science.gov (United States)

    Watershed information systems that integrate data and analytical tools are critical enabling technologies to support Integrated Water Resource Management (IWRM) by converting data into information, and information into knowledge. Many factors bring people to the table to participate in an IWRM fra...

  18. Basic principles, contents, and benefits of an integrated management system

    International Nuclear Information System (INIS)

    Schwarzin, Juergen

    2010-01-01

    The basic principles and contents of an integrated management system are presented. The report focuses on the benefits and the experience accumulated in using an integrated management system. Integrated management systems are characterized by 2 features in particular: - On the one hand, by a system holistically controlling and describing all processes within a company which are necessary to achieve the company policy and company goals as defined. - On the other hand, it combines in one integrated management system various different aspects (such as quality, environmental protection, and safety) and the resulting requirements. Successful implementation of an integrated management system requires a clear commitment by company management to the integrated management system serving as a management tool. Implementation must be assigned the appropriate importance in the company. It must not be viewed as an instrument preserving 'status quo.' Instead, it must be seen as a tool for long-term improvement of the company. Application of the integrated management system minimizes the probability of occurrence of events, but is not able to reduce it to zero. (orig.)

  19. Integrated solid waste management in Germany

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This report covers Germany`s experience with integrated solid waste management programs. The municipal solid waste practices of four cities include practices and procedures that waste facility managers with local or state governments may consider for managing their own day-to-day operations.

  20. Integrated management system laying a foundation for excellence

    Energy Technology Data Exchange (ETDEWEB)

    Brissette, S.; Vincent, D. [Bruce Power, Tiverton, Ontario (Canada)], E-mail: Derek.VINCENT@brucepower.com

    2009-07-01

    Integration in its simplest form involves seamless coordination between organizational elements such as organization structure, processes, systems and documents. This paper discusses the concept of integration in regards to managed systems and examines practical issues of marrying evolving standards to organizational design and overall governance. Bruce Power's experience in developing its Management System into a more integrated approach is described. Leadership sponsorship of an integrated programmatic approach using a Governance, Oversight, Support and Perform (GOSP) model of accountability framework within the Management System has been a critical success factor in Bruce Power's journey towards achieving operational excellence. (author)

  1. Integrated management system laying a foundation for excellence

    International Nuclear Information System (INIS)

    Brissette, S.; Vincent, D.

    2009-01-01

    Integration in its simplest form involves seamless coordination between organizational elements such as organization structure, processes, systems and documents. This paper discusses the concept of integration in regards to managed systems and examines practical issues of marrying evolving standards to organizational design and overall governance. Bruce Power's experience in developing its Management System into a more integrated approach is described. Leadership sponsorship of an integrated programmatic approach using a Governance, Oversight, Support and Perform (GOSP) model of accountability framework within the Management System has been a critical success factor in Bruce Power's journey towards achieving operational excellence. (author)

  2. Integrating workflow and project management systems for PLM applications

    Directory of Open Access Journals (Sweden)

    Fabio Fonseca Pereira de Paula

    2008-07-01

    Full Text Available The adoption of Product Life-cycle Management Systems (PLMs concept is fundamental to improve the product development, mainly to small and medium enterprises (SMEs. One of the challenges is the integration between project management and product data management functions. The paper presents an analysis of the potential integration strategies for a specifics product data management system (SMARTEAM and a project management system (Microsoft Project, which are commonly used for SMEs. Finally the article presents some considerations about the study of Project Management solutions in SMB’s companies, considering the PLM approach. Key-words: integration, project management (PM, workflow, PDM, PLM.

  3. Integrated sulphur management : gas, oil sands, reclamation and the challenges of fluctuating demand

    International Nuclear Information System (INIS)

    Pineau, R.

    2009-01-01

    International Commodities Export Corporation is a privately held company that provides fully integrated service offerings to add maximum value in designing, building, owning, and operating sulphur assets. The company also offers in-house, engineering, procurement and project management, as well as supply management, transportation and distribution services. It also has expertise in marine transportation. This presentation discussed integrated sulphur management, with particular focus on gas, oil sands, reclamation and the challenges of fluctuating demand. The presentation provided an overview of the sulphur market and oil sands sulphur. Key considerations for oil sands producers were also presented. The challenges of fluctuating demand include price and volume considerations; logistics; geography and distance to market; export/offshore versus domestic/United States; seasonal considerations; and an inelastic sulphur market. The presentation concluded with a status update of ICEC's initiative and the advantages of Prince Rupert, an economically viable export infrastructure to producers without onsite forming facilities. figs

  4. Global challenges in integrated coastal zone management

    DEFF Research Database (Denmark)

    integration of data and information in policy and management, combining expertise from nature and social science, to reach a balanced and sustainable development of the coastal zone. This important book comprises the proceedings of The International Symposium on Integrated Coastal Zone Management, which took....../mitigation to change in coastal systems Coastal governance Linking science and management Comprising a huge wealth of information, this timely and well-edited volume is essential reading for all those involved in coastal zone management around the globe. All libraries in research establishments and universities where...

  5. Advanced Air Traffic Management Research (Human Factors and Automation): NASA Research Initiatives in Human-Centered Automation Design in Airspace Management

    Science.gov (United States)

    Corker, Kevin M.; Condon, Gregory W. (Technical Monitor)

    1996-01-01

    NASA has initiated a significant thrust of research and development focused on providing the flight crew and air traffic managers automation aids to increase capacity in en route and terminal area operations through the use of flexible, more fuel-efficient routing, while improving the level of safety in commercial carrier operations. In that system development, definition of cognitive requirements for integrated multi-operator dynamic aiding systems is fundamental. The core processes of control and the distribution of decision making in that control are undergoing extensive analysis. From our perspective, the human operators and the procedures by which they interact are the fundamental determinants of the safe, efficient, and flexible operation of the system. In that perspective, we have begun to explore what our experience has taught will be the most challenging aspects of designing and integrating human-centered automation in the advanced system. We have performed a full mission simulation looking at the role shift to self-separation on board the aircraft with the rules of the air guiding behavior and the provision of a cockpit display of traffic information and an on-board traffic alert system that seamlessly integrates into the TCAS operations. We have performed and initial investigation of the operational impact of "Dynamic Density" metrics on controller relinquishing and reestablishing full separation authority. (We follow the assumption that responsibility at all times resides with the controller.) This presentation will describe those efforts as well as describe the process by which we will guide the development of error tolerant systems that are sensitive to shifts in operator work load levels and dynamic shifts in the operating point of air traffic management.

  6. Integrating pharmacogenomics into pharmacy practice via medication therapy management.

    Science.gov (United States)

    Reiss, Susan M

    2011-01-01

    To explore the application and integration of pharmacogenomics in pharmacy clinical practice via medication therapy management (MTM) to improve patient care. Department of Health & Human Services (HHS) Personalized Health Care Initiative, Food and Drug Administration (FDA) pharmacogenomics activity, and findings from the Utilizing E-Prescribing Technologies to Integrate Pharmacogenomics into Prescribing and Dispensing Practices Stakeholder Workshop, convened by the American Pharmacists Association (APhA) on March 5, 2009. Participants at the Stakeholder Workshop included diverse representatives from pharmacy, medicine, pathology, health information technology (HIT), standards, science, academia, government, and others with a key interest in the clinical application of pharmacogenomics. In 2006, HHS initiated the Personalized Health Care Initiative with the goal of building the foundation for the delivery of gene-based care, which may prove to be more effective for large patient subpopulations. In the years since the initiative was launched, drug manufacturers and FDA have begun to incorporate pharmacogenomic data and applications of this information into the drug development, labeling, and approval processes. New applications and processes for using this emerging pharmacogenomics data are needed to effectively integrate this information into clinical practice. Building from the findings of a stakeholder workshop convened by APhA and the advancement of the pharmacist's collaborative role in patient care through MTM, emerging roles for pharmacists using pharmacogenomic information to improve patient care are taking hold. Realizing the potential role of the pharmacist in pharmacogenomics through MTM will require connectivity of pharmacists into the electronic health record infrastructure to permit the exchange of pertinent health information among all members of a patient's health care team. Addressing current barriers, concerns, and system limitations and developing

  7. Integrated coastal management in Uruguay

    International Nuclear Information System (INIS)

    2011-01-01

    Integrated coastal management in Uruguay Carmelo includes the following areas-Nueva Palmira challenges and opportunities for local development in a context of large-scale industrial (Conchillas Uruguay), coastal management and stream Arroyo Solis Solis Chico Grande, Punta Colorada and Punta Negra, Maldonado Province Arroyo Valizas and sustainable tourism.

  8. Integrated Natural Resource Management in the Highlands of ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    1 janv. 2012 ... Integrated Natural Resource Management in the Highlands of Eastern Africa: ... goal of implementing an integrated approach to natural resource ... and the International Water Management Institute in Addis Ababa, Ethiopia.

  9. Safety and resiliency in action: Integrating risk management into local development

    Directory of Open Access Journals (Sweden)

    Ebay Jorge S.

    2013-01-01

    Full Text Available This paper examines the efforts of the local government unit (LGU of San Jose de Buenavista, in the Province of Antique in central Philippines to manage risks associated with multiple hazards to protect the people, their livelihoods and local development gains. More specifically, it analyzes the process of pursuing risk management objectives vis-a-vis national and international disaster risk reduction and management (DRRM norms, without loosing sight of local contextual realities that directly influence people’s vulnerabilities and capacities. Risk management initiatives in the LGU revolve around four key areas namely disaster prevention and mitigation, disaster preparedness, emergency response, and recovery and rehabilitation. Binding these initiatives are actions that integrate governance mechanisms with scientific data and sectoral and community participation to develop a comprehensive plan of action and standard operating procedures that will serve as guideposts in the process of building a safer community. The experience of San Jose de Buenavista also suggests that cost saving strategies an be replicated by communities and organizations that have financial limitations to pursue DRRM objectives. This paper contends that risk management is a fundamental development strategy to pursue local development goals and to sustain efforts to protect development gains in the long run. This can be done using a combination of governance, risk assessment, knowledge management, vulnerability reduction and preparedness strategies. Local leadership, people’s participation, environmental resource management and continuous capability building are key elements of the process. Ultimately, risk management must be mainstreamed into local development to develop community resiliency.

  10. Integrated Natural Resource Management in the Highlands of ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2012-01-01

    Jan 1, 2012 ... Book cover Integrated Natural Resource Management in the ... with the common goal of implementing an integrated approach to natural resource ... and the International Water Management Institute in Addis Ababa, Ethiopia.

  11. Integrating Long-Term Avian Studies with Planning and Adaptive Management: Department of Energy Lands as a Case Study.

    Energy Technology Data Exchange (ETDEWEB)

    Burger, J.

    2000-10-01

    Long-term bio-monitoring of avian communities have been initiated, but they often lack a management component. Integration of the managers needs at an early stage is suggested as a means to increase the use of the data. Variation in community structure is important in understanding impacts. In addition, reference site must be carefully selected.

  12. The Integrated Safety Management System (ISMS) of the US Department of Energy

    International Nuclear Information System (INIS)

    Linn, M.A.

    1999-01-01

    While the Integrated Safety Management System (ISMS) program is a fairly rational approach to safety, it represents the culmination of several years of hard-earned lessons learned. Considering the size and the diversity of interrelated elements which make up the USDOE complex, this result shows the determination of both the USDOE and its contractors to bring safety hazards to heel. While these lessons learned were frustrating and expensive, the results were several key insights upon which the ISMS was built: (1) Ensure safety management is integral to the business. Safety management must become part of each work activity, rather that something in addition to or on top of. (2) Tailor the safety requirements to the work and its hazards. In order to be cost-effective and efficient, safety management should have flexibility in order to match safety requirements with the level of the hazards in a graded manner. (3) Safety management must be coherent and integrated. Large and complex organizations are no excuse for fragmented and overlapping safety initiatives and programs. Simple, from the ground up objectives and principles must be defined and used to guide a comprehensive safety management program. (4) A safety management system must balance resources and priorities. The system must provide the means to balance resources against the particular work hazards, recognizing that different degrees of hazards requires corresponding prevention measures. (5) Clear roles and responsibilities for safety management must be defined. Both the regulator and the contractor have specific responsibilities for safety which must be clearly articulated at all levels of the work processes. (6) Those responsible for safety must have the competence to carry it out. Those assigned responsibilities must have the experience, knowledge, skills, and authority to carry them out. As one can surmise, the ISMS is not a new program to be implemented, but rather a new attitude which must be adopted

  13. Waste management - an integral part of environmental management systems

    Energy Technology Data Exchange (ETDEWEB)

    Hamm, Ulrich

    1998-12-01

    To consider waste as a resource instead of an annoyance with which the management has to cope with, has become an unavoidable task for modern managers. The task the management has to take to secure competitiveness in an environment of rising complexity of production processes and further increasing legal requirements, is to manage waste as much as other recourses are managed. Waste has to be considered an aspect of planning and decision process just as business plans or logistics are. Main themes discussed in this publication comprise waste management, implementation of waste management as an integral part of environmental management systems, and management approach to waste - the results. 4 figs.

  14. Management systems for high reliability organizations. Integration and effectiveness; Managementsysteme fuer Hochzuverlaessigkeitsorganisationen. Integration und Wirksamkeit

    Energy Technology Data Exchange (ETDEWEB)

    Mayer, Michael

    2015-03-09

    The scope of the thesis is the development of a method for improvement of efficient integrated management systems for high reliability organizations (HRO). A comprehensive analysis of severe accident prevention is performed. Severe accident management, mitigation measures and business continuity management are not included. High reliability organizations are complex and potentially dynamic organization forms that can be inherently dangerous like nuclear power plants, offshore platforms, chemical facilities, large ships or large aircrafts. A recursive generic management system model (RGM) was development based on the following factors: systemic and cybernetic Asepcts; integration of different management fields, high decision quality, integration of efficient methods of safety and risk analysis, integration of human reliability aspects, effectiveness evaluation and improvement.

  15. INTEGRATION OF ENVIRONMENTAL MANAGEMENT SYSTEM

    OpenAIRE

    Tomescu Ada Mirela

    2012-01-01

    The relevance of management as significant factor of business activity can be established on various management systems. These will help to obtain, organise, administrate, evaluate and control particulars: information, quality, environmental protection, health and safety, various resources (time, human, finance, inventory etc). The complexity of nowadays days development, forced us to think ‘integrated’. Sustainable development principles require that environment management policies and p...

  16. Managing for Organizational Integrity.

    Science.gov (United States)

    Paine, Lynn Sharp

    1994-01-01

    Compliance-based ethics programs focus on prevention, detection, and punishment. Companies should adopt an integrity-based approach to ethics management that combines a concern for the law with an emphasis on managerial responsibility for ethical behavior. (JOW)

  17. Integrated ageing management of Atucha NPP

    International Nuclear Information System (INIS)

    Ranalli, Juan M.; Marchena, Martin H.; Zorrilla, Jorge R.; Antonaccio, Elvio E.; Brenna, Pablo; Yllanez, Daniela; Cruz, Gerardo Vera de la; Luraschi, Carlos; Sabransky, Mario

    2013-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor, twice as big as Atucha I finishing a delayed construction. With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  18. Integrated Ageing Management of Atucha NPP

    International Nuclear Information System (INIS)

    Ranalli, J.M.; Marchena, M.H.; Zorrilla, J.R.; Sabransky, M.

    2012-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor twice as big as Atucha I finishing a delayed construction . With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  19. Integrated ageing management of Atucha NPP

    Energy Technology Data Exchange (ETDEWEB)

    Ranalli, Juan M.; Marchena, Martin H.; Zorrilla, Jorge R.; Antonaccio, Elvio E.; Brenna, Pablo; Yllanez, Daniela; Cruz, Gerardo Vera de la; Luraschi, Carlos, E-mail: ranalli@cnea.gov.ar [Gerencia Coordinacion Proyectos CNEA-NASA, Comision Nacional de Energia Atomica, Buenos Aires (Argentina); Sabransky, Mario, E-mail: msabransky@na-sa.com.ar [Departamento Gestion de Envejecimiento, Central Nuclear Atucha I-II Nucleoelectrica Argentina S.A., Provincia de Buenos Aires (Argentina)

    2013-07-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor, twice as big as Atucha I finishing a delayed construction. With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  20. Power management techniques for integrated circuit design

    CERN Document Server

    Chen, Ke-Horng

    2016-01-01

    This book begins with the premise that energy demands are directing scientists towards ever-greener methods of power management, so highly integrated power control ICs (integrated chip/circuit) are increasingly in demand for further reducing power consumption. * A timely and comprehensive reference guide for IC designers dealing with the increasingly widespread demand for integrated low power management * Includes new topics such as LED lighting, fast transient response, DVS-tracking and design with advanced technology nodes * Leading author (Chen) is an active and renowned contributor to the power management IC design field, and has extensive industry experience * Accompanying website includes presentation files with book illustrations, lecture notes, simulation circuits, solution manuals, instructors manuals, and program downloads.

  1. INTEGRATION OF ENVIRONMENTAL MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Tomescu Ada Mirela

    2012-07-01

    Full Text Available The relevance of management as significant factor of business activity can be established on various management systems. These will help to obtain, organise, administrate, evaluate and control particulars: information, quality, environmental protection, health and safety, various resources (time, human, finance, inventory etc. The complexity of nowadays days development, forced us to think ‘integrated’. Sustainable development principles require that environment management policies and practices are not good in themselves but also integrate with all other environmental objectives, and with social and economic development objectives. The principles of sustainable development involve that environment management policies and practices. These are not sound in them-self but also integrate with all other environmental objectives, and with social and economic development objectives. Those objectives were realized, and followed by development of strategies to effects the objective of sustainable development. Environmental management should embrace recent change in the area of environmental protection, and suit the recently regulations of the field -entire legal and economic, as well as perform management systems to meet the requirements of the contemporary model for economic development. These changes are trailed by abandon the conventional approach of environmental protection and it is replaced by sustainable development (SD. The keys and the aims of Cleaner Productions (CP are presented being implemented in various companies as a non-formalised environmental management system (EMS. This concept is suggested here as a proper model for practice where possible environmental harmful technologies are used -e.g. Rosia Montana. Showing the features and the power of CP this paper is a signal oriented to involve the awareness of policy-makers and top management of diverse Romanian companies. Many companies in European countries are developing

  2. ASPECTS OF INTEGRATION MANAGEMENT METHODS

    Directory of Open Access Journals (Sweden)

    Artemy Varshapetian

    2015-10-01

    Full Text Available For manufacturing companies to succeed in today's unstable economic environment, it is necessary to restructure the main components of its activities: designing innovative product, production using modern reconfigurable manufacturing systems, a business model that takes into account the global strategy and management methods using modern management models and tools. The first three components are discussed in numerous publications, for example, (Koren, 2010 and is therefore not considered in the article. A large number of publications devoted to the methods and tools of production management, for example (Halevi, 2007. On the basis of what was said in the article discusses the possibility of the integration of only three methods have received in recent years, the most widely used, namely: Six Sigma method - SS (George et al., 2005 and supplements its-Design for six sigm? - DFSS (Taguchi, 2003; Lean production transformed with the development to the "Lean management" and further to the "Lean thinking" - Lean (Hirano et al., 2006; Theory of Constraints, developed E.Goldratt - TOC (Dettmer, 2001. The article investigates some aspects of this integration: applications in diverse fields, positive features, changes in management structure, etc.

  3. Integrated Procurement Management System, Version II

    Science.gov (United States)

    Collier, L. J.

    1985-01-01

    Integrated Procurement Management System, Version II (IPMS II) is online/ batch system for collecting developing, managing and disseminating procurementrelated data at NASA Johnson Space Center. Portions of IPMS II adaptable to other procurement situations.

  4. Innovation Management in Emerging Technology Ventures – The Concept of an Integrated Idea Management

    DEFF Research Database (Denmark)

    Brem, Alexander; Voigt, K.-I.

    2007-01-01

    , development and sales. Here especially, differentiating potentials are offered for emerging technology ventures. But it is important that idea and innovation management are integrated during the building-up stage while internal and external network structures are still manageable and often consist...... of the managers' and founders' personal contacts. Hence, the earlier an integrated idea management is implemented, the greater is the probability of high numbers of successful innovations.......For decades, suggestion systems have been used to include employees in the innovation process. However, in order to gather superior ideas, integrating external stakeholders is critical to the innovation success. Within this paper, the authors derive a sophisticated model of an integrated idea...

  5. Integrating the autonomous subsystems management process

    Science.gov (United States)

    Ashworth, Barry R.

    1992-01-01

    Ways in which the ranking of the Space Station Module Power Management and Distribution testbed may be achieved and an individual subsystem's internal priorities may be managed within the complete system are examined. The application of these results in the integration and performance leveling of the autonomously managed system is discussed.

  6. Participatory Planning, Monitoring and Evaluation of Multi-Stakeholder Platforms in Integrated Landscape Initiatives.

    Science.gov (United States)

    Kusters, Koen; Buck, Louise; de Graaf, Maartje; Minang, Peter; van Oosten, Cora; Zagt, Roderick

    2017-03-21

    Integrated landscape initiatives typically aim to strengthen landscape governance by developing and facilitating multi-stakeholder platforms. These are institutional coordination mechanisms that enable discussions, negotiations, and joint planning between stakeholders from various sectors in a given landscape. Multi-stakeholder platforms tend to involve complex processes with diverse actors, whose objectives and focus may be subjected to periodic re-evaluation, revision or reform. In this article we propose a participatory method to aid planning, monitoring, and evaluation of such platforms, and we report on experiences from piloting the method in Ghana and Indonesia. The method is comprised of three components. The first can be used to look ahead, identifying priorities for future multi-stakeholder collaboration in the landscape. It is based on the identification of four aspirations that are common across multi-stakeholder platforms in integrated landscape initiatives. The second can be used to look inward. It focuses on the processes within an existing multi-stakeholder platform in order to identify areas for possible improvement. The third can be used to look back, identifying the main outcomes of an existing platform and comparing them to the original objectives. The three components can be implemented together or separately. They can be used to inform planning and adaptive management of the platform, as well as to demonstrate performance and inform the design of new interventions.

  7. Integrated management system - management standards evolution and the IAEA new approach

    International Nuclear Information System (INIS)

    Oliveira, Dirceu Paulo de; Zouain, Desiree Moraes

    2007-01-01

    The management standards application began in military and nuclear areas towards the end of Second World War, when some westerns countries developed quality standards to improve their means to assess suppliers' conditions to assure their products conformance, which was increasingly complex and required a higher degree of reliability. Afterwards, the quality standards application was extended to the consumer market focused on consumers' requirements satisfaction. Coming along the society crescent concern about quality of life, other management standards were developed, such as those dealing with environmental and sustainable development, occupational health and safety, social accountability and so on. As a consequence, the management process became complex. The management system integrated form approach makes possible the compatibility of distinct and complementary interests from several functions and disciplines involved and supply the absence of the organizations' holistic approach. According to this integrated management approach, the Agency - 'International Atomic Energy Agency' (IAEA) - decided to review the structure of the 50-C-Q standard - 'Quality Assurance for Safety in Nuclear Power Plants and Other Nuclear Installations', from 1996, publishing in 2006 the new GS-R-3 standard - 'The Management System for Facilities and Activities - Safety Requirements'. This work presents a brief evolution of management standards and integrated management approach, showing the Agency's new vision concerning this issue with the GS-R-3 standard publication. (author)

  8. Structural integrity analyses: can we manage the advances?

    International Nuclear Information System (INIS)

    Sauve, R.

    2006-01-01

    Engineering has been one of a number of disciplines in which significant advances in analysis procedures has taken place in the last two decades. In particular, advances in computer technology and engineering software have revolutionized the assessment of component structural integrity for a wide range of applications. A significant development in computational mechanics directly related to computer technology that has had a profound impact on the field of structural integrity is the finite element method. The finite element method has re-defined and expanded the role of structural integrity assessments by providing comprehensive modelling capabilities to engineers involved in design and failure analyses. As computer processing speeds and capacity have increased, so has the role of computer modelling in assessments of component structural integrity. With new product development cycles shrinking, the role of initial testing is being reduced in favour of computer modelling and simulation to assess component life and durability. For ageing structures, the evaluation of remaining life and the impact of degraded structural integrity becomes tractable with the modern advances in computational methods. The areas of structural integrity that have derived great benefit from the advances in numerical techniques include stress analysis, fracture mechanics, dynamics, heat transfer, structural reliability, probabilistic methods and continuum mechanics in general. One of the salient features of the current methods is the ability to handle large complex steady state or transient dynamic problems that exhibit highly non-linear behaviour. With the ever-increasing usage of these advanced methods, the question is posed: Can we manage the advances? Better still are we managing the advances? As with all technological advances that enter mainstream use, comes the need for education, training and certification in the application of these methods, improved quality assurance procedures and

  9. Implementing Knowledge Management as a Strategic Initiative

    National Research Council Canada - National Science Library

    DiGiacomo, Joseph

    2003-01-01

    ... are: leadership, organization, technology and leaning. Knowledge management was one of five strategic initiatives in the overall strategic plan, which was developed using Kaplan and Norton's Balanced Scorecard methodology...

  10. Pipeline integrity management in an urban environment supported by an External Corrosion Direct Assessment (ECDA) application

    Energy Technology Data Exchange (ETDEWEB)

    Dus, Pedro Luiz; Valente, Antonio Carlos Rodrigues [Companhia de Gas de Sao Paulo (COMGAS), Sao Paulo, SP (Brazil); Valdes, Alberto [GE Oil and Gas-PII Pipeline Solutions, Houston, TX (United States)

    2009-07-01

    COMGAS is the largest natural gas distributing company in Brazil, having more than 700,000 costumers. Gas delivery to this customer base is achieved through a network of high-pressure steel pipelines (17 and 35 bar) with around 1,100 km (690 miles) in length, the majority operating inside urban areas. The Integrity Management of this network is a particularly difficult task since neither pigging nor hydrostatic testing can be used to inspect the existing pipelines. Direct Assessment (DA) is the only assessment technique available at the moment. As an initial stage COMGAS has implemented an innovative project called SIA (Sistema de Integridade de Ativos). SIA combines functionality targeted for guiding and implementing an External Corrosion Assessment (ECDA) procedure, with full data alignment and integration, corporate policies on safety and dedicated reporting capabilities. Seamless interaction between SIA and the existing Operations GIS system was a key specification requirement for the construction of the system. This paper describes the lessons learned during the implementation of the ECDA module of the SIA, the first application experiences of the ECDA process with the support of the module and the initial benefits obtained from the use of the new Integrity Management System. (author)

  11. An Analysis of Computer Aided Design (CAD) Packages Used at MSFC for the Recent Initiative to Integrate Engineering Activities

    Science.gov (United States)

    Smith, Leigh M.; Parker, Nelson C. (Technical Monitor)

    2002-01-01

    This paper analyzes the use of Computer Aided Design (CAD) packages at NASA's Marshall Space Flight Center (MSFC). It examines the effectiveness of recent efforts to standardize CAD practices across MSFC engineering activities. An assessment of the roles played by management, designers, analysts, and manufacturers in this initiative will be explored. Finally, solutions are presented for better integration of CAD across MSFC in the future.

  12. Project management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-12-01

    The Dallas Integrated Corridor Management System Demonstration Project is a multi-agency, de-centralized operation which will utilize a set of regional systems to integrate the operations of the corridor. The purpose of the Dallas ICM System is to im...

  13. DKIST facility management system integration

    Science.gov (United States)

    White, Charles R.; Phelps, LeEllen

    2016-07-01

    The Daniel K. Inouye Solar Telescope (DKIST) Observatory is under construction at Haleakalā, Maui, Hawai'i. When complete, the DKIST will be the largest solar telescope in the world. The Facility Management System (FMS) is a subsystem of the high-level Facility Control System (FCS) and directly controls the Facility Thermal System (FTS). The FMS receives operational mode information from the FCS while making process data available to the FCS and includes hardware and software to integrate and control all aspects of the FTS including the Carousel Cooling System, the Telescope Chamber Environmental Control Systems, and the Temperature Monitoring System. In addition it will integrate the Power Energy Management System and several service systems such as heating, ventilation, and air conditioning (HVAC), the Domestic Water Distribution System, and the Vacuum System. All of these subsystems must operate in coordination to provide the best possible observing conditions and overall building management. Further, the FMS must actively react to varying weather conditions and observational requirements. The physical impact of the facility must not interfere with neighboring installations while operating in a very environmentally and culturally sensitive area. The FMS system will be comprised of five Programmable Automation Controllers (PACs). We present a pre-build overview of the functional plan to integrate all of the FMS subsystems.

  14. Integrating incident investigation into the management system

    International Nuclear Information System (INIS)

    Peterson, E.E.

    1992-01-01

    In the last 10 yr, the size and frequency of incidents affecting the communities and environment surrounding chemical processing facilities has increased. The chemical process industry, which has always concerned itself with the safety of its facilities, has responded by committing to stricter standards of operation and management. A critical element of these management practices is the use of a structured incident investigation program. Many facilities have implemented and disciplined themselves to perform good investigation of incidents. However, most of these facilities maintain incident investigation as part of their safety management programs. This allows the process to be disconnected from the management system that deals with the day-to-day business of the facility. The first step of integration is understanding the objectives and functions of the management system into which the integration is to occur. To begin, a common definition of management is needed. Management, for the purposes of this discussion, is defined as the system of activities used to control, coordinate, and improve the flow of work within a facility or organization. This definition refers to several concepts that need further development in order to understand how incident investigation can be integrated into a management system, including (a) flow of work, (b) control, and (c) improvement. Application can be made to the nuclear industry

  15. Nuclear Plant Integrated Outage Management

    International Nuclear Information System (INIS)

    Gerstberger, C. R.; Coulehan, R. J.; Tench, W. A.

    1992-01-01

    This paper is a discussion of an emerging concept for improving nuclear plant outage performance - integrated outage management. The paper begins with an explanation of what the concept encompasses, including a scope definition of the service and descriptions of the organization structure, various team functions, and vendor/customer relationships. The evolvement of traditional base scope services to the integrated outage concept is addressed and includes discussions on changing customer needs, shared risks, and a partnership approach to outages. Experiences with concept implementation from a single service in 1984 to the current volume of integrated outage management presented in this paper. We at Westinghouse believe that the operators of nuclear power plants will continue to be aggressively challenged in the next decade to improve the operating and financial performance of their units. More and more customers in the U. S. are looking towards integrated outage as the way to meet these challenges of the 1990s, an arrangement that is best implemented through a long-term partnering with a single-source supplier of high quality nuclear and turbine generator outage services. This availability, and other important parameters

  16. Integration of Standardized Management Systems: A Dilemma?

    Directory of Open Access Journals (Sweden)

    Manuel Ferreira Rebelo

    2015-06-01

    Full Text Available The growing proliferation of management systems standards (MSSs, and their individualized implementation, is a real problem faced by organizations. On the other hand, MSSs are aimed at improving efficiency and effectiveness of organizational responses in order to satisfy the requirements, needs and expectations of the stakeholders. Each organization has its own identity and this is an issue that cannot be neglected; hence, two possible approaches can be attended. First, continue with the implementation of individualized management systems (MSs; or, integrate the several MSSs versus related MSs into an integrated management system (IMS. Therefore, in this context, organizations are faced with a dilemma, as a result of the increasing proliferation and diversity of MSSs. This paper takes into account the knowledge gained through a case study conducted in the context of a Portuguese company and unveils some of the advantages and disadvantages of integration. A methodology is also proposed and presented to support organizations in developing and structuring the integration process of their individualized MSs, and consequently minimize problems that are generators of inefficiencies, value destruction and loss of competitiveness. The obtained results provide relevant information that can support Top Management decision in solving that dilemma and consequently promote a successful integration, including a better control of business risks associated to MSSs requirements and enhancing sustainable performance, considering the context in which organizations operate.

  17. Integrated Rural-Urban Water Management for Climate Based ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    There are serious short- and long-term consequences on human health, physical assets, economic ... To work, adaptive climate-proof integrated urban water management must extend throughout the whole catchment, an approach known as integrated water resource management. ... Careers · Contact Us · Site map.

  18. Groundwater/Vadose Zone Integration Project Management Plan

    International Nuclear Information System (INIS)

    Hughes, M. C.

    1999-01-01

    This Project Management Plan (PMP) defines the authorities, roles, and responsibilities of the US Department of Energy (DOE), Richland Operations Office (RL) and those contractor organizations participating in the Hanford Site' s Groundwater/Vadose Zone (GW/VZ) Integration Project. The PMP also describes the planning and control systems, business processes, and other management tools needed to properly and consistently conduct the Integration Project scope of work

  19. Implementing Integrated River Basin Management in China

    Directory of Open Access Journals (Sweden)

    Dorri G. J. te Boekhorst

    2010-06-01

    Full Text Available This paper examines the role of the World Wildlife Fund for Nature China as policy entrepreneur in China. It illustrates the ways in which the World Wildlife Fund for Nature is active in promoting integrated river basin management in the Yangtze River basin and how the efforts at basin level are matched with the advice of the China Council for International Cooperation on Environment and Development task force on integrated river basin management to the national government of China. This article demonstrates that the World Wildlife Fund for Nature uses various strategies of different types to support a transition process towards integrated river basin management. Successful deployment of these strategies for change in environmental policy requires special skills, actions, and attitudes on the part of the policy entrepreneur, especially in China, where the government has a dominant role regarding water management and the position of policy entrepeneurs is delicate.

  20. Role of plant pathology in integrated pest management.

    Science.gov (United States)

    Jacobsen, B J

    1997-01-01

    Integrated Pest Management (IPM) is a paradigm that is widely adopted by all pest control disciplines but whose early definitions and philosophical basis belong to entomologists. Plant pathology research and extension work has historically emphasized integration of several control strategies and fits both historical and modern definitions of IPM. While the term IPM has been used only sparingly in the phytopathology literature, the integrated disease management strategies emphasized are now considered to be at the forefront of ecologically based or biointensive pest management. While IPM is broadly endorsed by crop protection disciplines, farmers, other agriculturalists, and consumers, the potential for Integrated Pest Management has not been fully realized. Most IPM programs reflect a package of tools and decision aids for individual crop insect, weed, nematode, and plant disease management. IPM programs that integrate all types of pests with the agroecosystem, crop growth and loss models still await the formation of interdisciplinary teams focusing on growers needs. Lack of funding for both discipline and interdisciplinary developmental research and implementation is responsible for the paucity of comprehensive IPM programs for the majority of the U.S. crop acreage. This review explores the origins and evolution of the IPM paradigm and reviews efforts to achieve the body of knowledge and implementation structure to achieve IPM's full potential.

  1. Risk and Work Configuration Management as a Function of Integrated Safety Management

    International Nuclear Information System (INIS)

    Lana Buehrer; Michele Kelly; Fran Lemieux; Fred Williams

    2007-01-01

    National Security Technologies, LLC (NSTec), has established a work management program and corresponding electronic Facilities and Operations Management Information System (e-FOM) to implement Integrated Safety Management (ISM). The management of work scopes, the identification of hazards, and the establishment of implementing controls are reviewed and approved through electronic signatures. Through the execution of the program and the implementation of the electronic system, NSTec staff work within controls and utilize feedback and improvement process. The Integrated Work Control Manual further implements the five functions of ISM at the Activity level. By adding the Risk and Work Configuration Management program, NSTec establishes risk acceptance (business and physical) for liabilities within the performance direction and work management processes. Requirements, roles, and responsibilities are specifically identified in the program while e-FOM provides the interface and establishes the flowdown from the Safety Chain to work and facilities management processes to company work-related directives, and finally to Subject Matter Expert concurrence. The Program establishes, within the defined management structure, management levels for risk identification, risk mitigation (controls), and risk acceptance (business and physical) within the Safety Chain of Responsibility. The Program also implements Integrated Safeguards and Security Management within the NSTec Safety Chain of Responsibility. Once all information has been entered into e-FOM, approved, and captured as data, the information becomes searchable and sortable by hazard, location, organization, mitigating controls, etc

  2. Integrated Assessment of the Policy of Working Capital Management in Housing and Utilities Enterprises

    Directory of Open Access Journals (Sweden)

    Vladimir Petrovich Poluyanov

    2017-06-01

    Full Text Available The article describes the approaches to the management of current assets in the enterprises of various industries in economic literature. We discuss theoretical, methodological and applied issues concerning the formation and improvement of the working capital management policy in utility companies, which require further study. The authors propose to assess the policy of working capital management in these enterprises by means of the integrated approach based on the system of reasoned indicators defining the type of working capital management policy. It includes indicators characterizing the policy of working capital management, management of the liquidity of working capital and the policy of financing sources management. The indicators which define the type of the policy of working capital management have been chosen as the most influential for each vector of the improvement of management policy. The range of values is set taking into account the current market conditions for the housing and utilities companies based on theoretical standard values adapted to modern situation. The paper proposes to use an integrated indicator for the evaluation of the policy of working capital management in housing and utilities enterprises. We have substantiated the technique of the integrated assessment of the policy of working capital management in housing and utilities companies. As an example of the application of this indicator, we defined the type of the policy of working capital management in Rostovvodokanal Company. The initial data for the calculation of integrated indicators are the official data on the structure of the balance and financial results of Rostovvodokanal Company during the period from 2012 to 2016. At the Rostovvodokanal Company, it is necessary to bring the type of the policy of working capital management and sources of its financing closer to moderate or conservative type. The authors have substantiated the optimal type of policy of

  3. Initial states in integrable quantum field theory quenches from an integral equation hierarchy

    Directory of Open Access Journals (Sweden)

    D.X. Horváth

    2016-01-01

    Full Text Available We consider the problem of determining the initial state of integrable quantum field theory quenches in terms of the post-quench eigenstates. The corresponding overlaps are a fundamental input to most exact methods to treat integrable quantum quenches. We construct and examine an infinite integral equation hierarchy based on the form factor bootstrap, proposed earlier as a set of conditions determining the overlaps. Using quenches of the mass and interaction in Sinh-Gordon theory as a concrete example, we present theoretical arguments that the state has the squeezed coherent form expected for integrable quenches, and supporting an Ansatz for the solution of the hierarchy. Moreover we also develop an iterative method to solve numerically the lowest equation of the hierarchy. The iterative solution along with extensive numerical checks performed using the next equation of the hierarchy provides a strong numerical evidence that the proposed Ansatz gives a very good approximation for the solution.

  4. Initial states in integrable quantum field theory quenches from an integral equation hierarchy

    Energy Technology Data Exchange (ETDEWEB)

    Horváth, D.X., E-mail: esoxluciuslinne@gmail.com [MTA-BME “Momentum” Statistical Field Theory Research Group, Budafoki út 8, 1111 Budapest (Hungary); Department of Theoretical Physics, Budapest University of Technology and Economics, Budafoki út 8, 1111 Budapest (Hungary); Sotiriadis, S., E-mail: sotiriad@sissa.it [SISSA and INFN, Via Bonomea 265, 34136 Trieste (Italy); Takács, G., E-mail: takacsg@eik.bme.hu [MTA-BME “Momentum” Statistical Field Theory Research Group, Budafoki út 8, 1111 Budapest (Hungary); Department of Theoretical Physics, Budapest University of Technology and Economics, Budafoki út 8, 1111 Budapest (Hungary)

    2016-01-15

    We consider the problem of determining the initial state of integrable quantum field theory quenches in terms of the post-quench eigenstates. The corresponding overlaps are a fundamental input to most exact methods to treat integrable quantum quenches. We construct and examine an infinite integral equation hierarchy based on the form factor bootstrap, proposed earlier as a set of conditions determining the overlaps. Using quenches of the mass and interaction in Sinh-Gordon theory as a concrete example, we present theoretical arguments that the state has the squeezed coherent form expected for integrable quenches, and supporting an Ansatz for the solution of the hierarchy. Moreover we also develop an iterative method to solve numerically the lowest equation of the hierarchy. The iterative solution along with extensive numerical checks performed using the next equation of the hierarchy provides a strong numerical evidence that the proposed Ansatz gives a very good approximation for the solution.

  5. Application of contemporary integrated manufacture systems to nuclear power plants management

    International Nuclear Information System (INIS)

    Zhou Gang; Wang Lushuai; Tang Yaoyang

    2005-01-01

    In order to improve the safety, economy and reliability of the operation of a nuclear power plant (NPP), a novel integrated management method is proposed based on the 'integration' concept of the computer and contemporary integrated manufacture systems (CIMS). The design of integrated management system for NPP is studied. In the design of this system, information integration method based on the database and product data management (PDM) technology is adopted. In order to design and integrated management system satisfying the needs of NPP management, all activities of NPP are divided into different categories according to its characteristics. There are subsystems under the general management system to conduct the management work of different categories. All subsystems are interrelated in the environment of CIMS, but relatively independent. The application of CIMS to NPP provides a new way for scientific management of NPP, and makes the best of human, material and information resources. (authors)

  6. Integrated Pest Management (IPM)

    Science.gov (United States)

    Repellents Rodenticides Other types of pesticides Disponible en español Integrated Pest Management (IPM) IPM Company: IPM is the Key - Oregon State University Extension Service Last updated May 11, 2018 Related Insecticides Natural and Biological Pesticides Repellents Rodenticides Other types of pesticides Disponible en

  7. Managed care, vertical integration strategies and hospital performance.

    Science.gov (United States)

    Wang, B B; Wan, T T; Clement, J; Begun, J

    2001-09-01

    The purpose of this study is to examine the association of managed care with hospital vertical integration strategies, as well as to observe the relationships of different types of vertical integration with hospital efficiency and financial performance. The sample consists of 363 California short-term acute care hospitals in 1994. Linear structure equation modeling is used to test six hypotheses derived from the strategic adaptation model. Several organizational and market factors are controlled statistically. Results suggest that managed care is a driving force for hospital vertical integration. In terms of performance, hospitals that are integrated with physician groups and provide outpatient services (backward integration) have better operating margins, returns on assets, and net cash flows (p < 0.01). These hospitals are not, however, likely to show greater productivity. Forward integration with a long-term-care facility, on the other hand, is positively and significantly related to hospital productivity (p < 0.001). Forward integration is negatively related to financial performance (p < 0.05), however, opposite to the direction hypothesized. Health executives should be responsive to the growth of managed care in their local market and should probably consider providing more backward integrated services rather than forward integrated services in order to improve the hospital's financial performance in today's competitive health care market.

  8. Theoretical framework of integrated strategic performance management system

    OpenAIRE

    Mitrović, Zorica; Todorović, Marija; Bjelica, Dragan

    2015-01-01

    The aim of this paper is to present a conceptual model of the integrated strategic performance management system. This model is conceptual framework designed as a result of research that shows significant benefits of integrated application of strategic management and performance management in organizations. The framework consists of five steps: establishing a planning system, establishing of performance measurement system, establishing an accountability system, establishing of the knowledge m...

  9. The AGU Data Management Maturity Model Initiative

    Science.gov (United States)

    Bates, J. J.

    2015-12-01

    In September 2014, the AGU Board of Directors approved two initiatives to help the Earth and space sciences community address the growing challenges accompanying the increasing size and complexity of data. These initiatives are: 1) Data Science Credentialing: development of a continuing education and professional certification program to help scientists in their careers and to meet growing responsibilities and requirements around data science; and 2) Data Management Maturity (DMM) Model: development and implementation of a data management maturity model to assess process maturity against best practices, and to identify opportunities in organizational data management processes. Each of these has been organized within AGU as an Editorial Board and both Boards have held kick off meetings. The DMM model Editorial Board will recommend strategies for adapting and deploying a DMM model to the Earth and space sciences create guidance documents to assist in its implementation, and provide input on a pilot appraisal process. This presentation will provide an overview of progress to date in the DMM model Editorial Board and plans for work to be done over the upcoming year.

  10. Managing racial integration in South African public schools: In ...

    African Journals Online (AJOL)

    The paper explores what racial integration is. Furthermore, it scrutinises how racial integration is currently managed in South African Public schools. The main argument of the paper defends a deliberative conception of managing racial integration in South African public schools. In light of this, there is some form of hope to ...

  11. Integrated groundwater data management

    Science.gov (United States)

    Fitch, Peter; Brodaric, Boyan; Stenson, Matt; Booth, Nathaniel; Jakeman, Anthony J.; Barreteau, Olivier; Hunt, Randall J.; Rinaudo, Jean-Daniel; Ross, Andrew

    2016-01-01

    The goal of a data manager is to ensure that data is safely stored, adequately described, discoverable and easily accessible. However, to keep pace with the evolution of groundwater studies in the last decade, the associated data and data management requirements have changed significantly. In particular, there is a growing recognition that management questions cannot be adequately answered by single discipline studies. This has led a push towards the paradigm of integrated modeling, where diverse parts of the hydrological cycle and its human connections are included. This chapter describes groundwater data management practices, and reviews the current state of the art with enterprise groundwater database management systems. It also includes discussion on commonly used data management models, detailing typical data management lifecycles. We discuss the growing use of web services and open standards such as GWML and WaterML2.0 to exchange groundwater information and knowledge, and the need for national data networks. We also discuss cross-jurisdictional interoperability issues, based on our experience sharing groundwater data across the US/Canadian border. Lastly, we present some future trends relating to groundwater data management.

  12. Integrated management system: The integration of ISO 9001, ISO 14001, OHSAS 18001 and ISO 31000

    Science.gov (United States)

    Muzaimi, Hafizzudin; Chew, Boon Cheong; Hamid, Syaiful Rizal

    2017-03-01

    The implementation of integrated management system (IMS) for better quality management has become a preference for many organizations. This can be seen as many organizations used the combination of quality ISO 9001, an environment ISO 14001 and occupational health and safety management system OHSAS 18001 as a core for the IMS that largely implemented. Besides, the linked between quality management with risk management system need to be identified as the management system that enhance the effectiveness of IMS. Therefore, the risk management system ISO 31000 also presented as a part of integration. In nowadays competitive environment, the increasing pressure and needs from customer or stakeholders make it compulsory for the organization to propose the new system and standards. This paper presents and discusses about the benefit of integration, the management system components that can be converged and the implementation approach. A series of interview was conducted through in-depth interviews with 8 experts in this field, while data collected were analyzed qualitatively. The results consist of 16 factors of IMS implementation that have been identified and the use of PDCA approach for an effective implementation of IMS. As a conclusion, the paper proposes the integration of four management systems (ISO 9001, ISO 14001, OHSAS 18001 and ISO 31000) and on how the IMS can be used to structure the process of management for quality management towards sustainability practices in the organization.

  13. INTEGRATING HEALTH TECHNOLOGY ASSESSMENT PRINCIPLES IN FORMULARY MANAGEMENT.

    Science.gov (United States)

    Teng, Monica; Khoo, Ai Leng; Zhao, Ying Jiao; Lin, Liang; Lim, Boon Peng

    2016-01-01

    Effective formulary management in healthcare institutions safeguards rational drug use and optimizes health outcomes. We implemented a formulary management program integrating the principles of health technology assessment (HTA) to improve the safe, appropriate, and cost-effective use of medicine in Singapore. A 3-year formulary management program was initiated in 2011 in five public healthcare institutions. This program was managed by a project team comprising HTA researchers. The project team worked with institutional pharmacy and therapeutics (P&T) committees to: (i) develop tools for formulary drug review and decision making; (ii) enhance the HTA knowledge and skills of formulary pharmacists and members of P&T committees; (iii) devise a prioritization framework to overcome resource constraints and time pressure; and (iv) conceptualize and implement a framework to review existing formulary. Tools that facilitate drug request submission, drug review, and decision making were developed for formulary drug inclusion. A systematic framework to review existing formulary was also developed and tested in selected institutions. A competency development plan was rolled out over 2 years to enhance formulary pharmacists' proficiency in systematic literature search and review, meta-analysis, and pharmacoeconomic evaluation. The plan comprised training workshops and on-the-job knowledge transfer between the project team and institutional formulary pharmacists through collaborating on selected drug reviews. A resource guide that consolidated the tools and templates was published to encourage the adoption of best practices in formulary management. Based on the concepts of HTA, we implemented an evidence-based approach to optimize formulary management.

  14. DNFSB Recommendation 94-1 Hanford site integrated stabilization management plan, volumes 1 and 2

    International Nuclear Information System (INIS)

    Gerber, E.W.

    1996-01-01

    This document comprises the Hanford Site Integrated Stabilization Management Plan (SISMP). This document describes the DOE's plans at the Hanford Site to address concerns identified in Defense Nuclear Facilites Safety Board (DNFSB) Recommendation 94-1. This document also identifies plans for other spent nuclear fuel (SNF) inventories at the Hanford Site which are not within the scope of DNFSB Recommendation 94-1 for reference purposes because of their interrelationship with plans for SNF within the scope of DNFSB Recommendation 94-1. The SISMP was also developed to assist DOE in initial formulation of the Research and Development Plan and the Integrated Facilities Plan

  15. Integrating School-Based and Therapeutic Conflict Management Models at School.

    Science.gov (United States)

    D'Oosterlinck, Franky; Broekaert, Eric

    2003-01-01

    Explores the possibility of integrating school-based and therapeutic conflict management models, comparing two management models: a school-based conflict management program, "Teaching Students To Be Peacemakers"; and a therapeutic conflict management program, "Life Space Crisis Intervention." The paper concludes that integration might be possible…

  16. An Integrated Care Initiative to Improve Patient Outcome in Schizophrenia

    OpenAIRE

    Mayer-Amberg, Norbert; Woltmann, Rainer; Walther, Stefanie

    2016-01-01

    The optimal treatment of schizophrenia patients requires integration of medical and psychosocial inputs. In Germany, various healthcare service providers and institutions are involved in the treatment process. Early and continuous treatment is important but often not possible because of the fragmented medical care system in Germany. The current work is a quality monitoring report of a novel care setting, called Integrated Care Initiative Schizophrenia. It has implemented a networked care con...

  17. Integrated Traffic Flow Management Decision Making

    Science.gov (United States)

    Grabbe, Shon R.; Sridhar, Banavar; Mukherjee, Avijit

    2009-01-01

    A generalized approach is proposed to support integrated traffic flow management decision making studies at both the U.S. national and regional levels. It can consider tradeoffs between alternative optimization and heuristic based models, strategic versus tactical flight controls, and system versus fleet preferences. Preliminary testing was accomplished by implementing thirteen unique traffic flow management models, which included all of the key components of the system and conducting 85, six-hour fast-time simulation experiments. These experiments considered variations in the strategic planning look-ahead times, the replanning intervals, and the types of traffic flow management control strategies. Initial testing indicates that longer strategic planning look-ahead times and re-planning intervals result in steadily decreasing levels of sector congestion for a fixed delay level. This applies when accurate estimates of the air traffic demand, airport capacities and airspace capacities are available. In general, the distribution of the delays amongst the users was found to be most equitable when scheduling flights using a heuristic scheduling algorithm, such as ration-by-distance. On the other hand, equity was the worst when using scheduling algorithms that took into account the number of seats aboard each flight. Though the scheduling algorithms were effective at alleviating sector congestion, the tactical rerouting algorithm was the primary control for avoiding en route weather hazards. Finally, the modeled levels of sector congestion, the number of weather incursions, and the total system delays, were found to be in fair agreement with the values that were operationally observed on both good and bad weather days.

  18. Information Systems Integration and Enterprise Application Integration (EAI) Adoption: A Case from Financial Services

    Science.gov (United States)

    Lam, Wing

    2007-01-01

    Increasingly, organizations find that they need to integrate large number of information systems in order to support enterprise-wide business initiatives such as e-business, supply chain management and customer relationship management. To date, organizations have largely tended to address information systems (IS) integration in an ad-hoc manner.…

  19. Waste Information Management System with Integrated Transportation Forecast Data

    International Nuclear Information System (INIS)

    Upadhyay, H.; Quintero, W.; Shoffner, P.; Lagos, L.

    2009-01-01

    The Waste Information Management System with Integrated Transportation Forecast Data was developed to support the Department of Energy (DOE) mandated accelerated cleanup program. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to site waste treatment and disposal were potential critical path issues under the accelerated schedules. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast and transportation information regarding the volumes and types of waste that would be generated by the DOE sites over the next 40 years. Each local DOE site has historically collected, organized, and displayed site waste forecast information in separate and unique systems. However, waste and shipment information from all sites needed a common application to allow interested parties to understand and view the complete complex-wide picture. The Waste Information Management System with Integrated Transportation Forecast Data allows identification of total forecasted waste volumes, material classes, disposition sites, choke points, technological or regulatory barriers to treatment and disposal, along with forecasted waste transportation information by rail, truck and inter-modal shipments. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, has deployed the web-based forecast and transportation system and is responsible for updating the waste forecast and transportation data on a regular basis to ensure the long-term viability and value of this system. (authors)

  20. 'Better medicines for children' within the Integrated Management of Childhood Illness framework: a qualitative inquiry in Uganda.

    Science.gov (United States)

    Nsabagasani, Xavier; Ogwal-Okeng, Japer; Hansen, Ebba Holme; Mbonye, Anthony; Muyinda, Herbert; Ssengooba, Freddie

    2016-01-01

    The Integrated Management of Childhood Illnesses is the main approach for treating children in more than 100 low income countries worldwide. In 2007, the World Health Assembly urged countries to integrate 'better medicines for children' into their essential medicines lists and treatment guidelines. WHO regularly provides generic algorithms for IMCI and publishes the Model Essential Medicines List with child-friendly medicines based on new evidence for member countries to adopt. However, the status of 'better medicines for children' within the Integrated Management of Childhood Illnesses approach in Uganda has not been studied. Qualitative interviews were conducted with: two officials from the ministry of health; two district health officials and, 22 health workers from public health facilities. Interview transcripts were manually analyzed for manifest and latent content. Child-appropriate dosage formulations were not included in the package for the Integrated Management of Childhood Illnesses and ministry officials attributed this to resource constraints and lack of initial guidance from the World Health Organization. Underfunding reportedly undercut efforts to: orient health workers; do support supervision and update treatment guidelines to reflect 'better medicines for children'. Health workers reported difficulties in administering tablets and capsules to under-five children and that's why they preferred liquid oral dosage formulations, suppositories and injections. The IMCI strategy in Uganda was not revised to reflect child-appropriate dosage formulations - a missed opportunity for improving the quality of management of childhood illnesses. Funding was an obstacle to the integration of child-appropriate dosage formulations. Ministry of health should prioritize funding for the Integrated Management of Childhood Illnesses and revising the Essential Medicines and Health Supplies List of Uganda, the Uganda Clinical Guidelines and, the Treatment Charts for the

  1. Development and improvement of the integrated system of management

    Directory of Open Access Journals (Sweden)

    Lukmanova Inessa Galeevna

    2014-07-01

    Full Text Available Integrated management system construction can be considered a way that transforms using business processes and information resources into final construction products. Autonomous system of quality management, environmental, health and safety organizations introduction usually lead to the accumulation of duplicate documents, which increase the time spent on processing and analysis as well as increase the financial costs of maintaining the operation of each of them separately. System integration allows reducing these costs and entailing the most obvious benefits: reduced volumes of documents; reduction of time spent on analysis; reducing the cost of audit and certification; involvement of all the employees of the organization; productivity growth; increasing the attractiveness for consumers; reducing the burden on administrative and executive devices; ensuring a high level of flexibility in the organization's management system in case of internal and external changes. Integration of quality management systems, environmental management and safety management systems, production and safety led to the possibility to establish such integrated management system in developing building companies, which allows establishing a unified management system, as an element of management of organization. The main drawback of the currently used standards and specifications is the lack of flexibility of their application, as well as the basic principles and approaches to their implementation. Thus, knowing about what the system should be, but not knowing how to create it, many organizations have to operate without methodological support. Absence of mandatory standards concerning integration of management systems creates opportunities for the existence of multiple options for interaction systems. Economic effects on the integrated management system is formed from three sources: the reduction of production costs by improving product quality and reducing defects and

  2. Integrated Simulation Of Supply Chain Management

    Directory of Open Access Journals (Sweden)

    N.Manikandan

    2013-06-01

    Full Text Available Nowadays, manufacturers face the challenge of reducing manufacturing cycle time, delivery lead time and inventory reduction. Every organization has its own objectives and its own way of decision making processes. Because of the conflictions among the objectives of each organization and non-integrated decision making processes, there has been a need for a new mechanism, which help to resolve those conflictions and to integrate processes. In the early 1990s, management is a process of integrating and utilizing suppliers, manufacturers, warehouses and retailers, so that goods are produced and delivered at the right quantities and at the right time while minimizing costs as well as satisfying customer requirements. Managing the entire supply chain becomes a key factor for the successful business. Organizations now realize that non-integrated manufacturing processes, nonintegrated distribution processes and poor relationships with suppliers and customers are in adequate for their success. The supply chain areas are affected by the organization’s plan. The organization plan’s impact on the supply chain areas cannot be predicted before its execution. Simulation paves way to evaluate the performance of plans before the execution of the plan. This paper describes the effort of developing a simulation model for the supply chain management in an industry. This article discusses the requirement of supply chain simulation modeling.

  3. Risk Informed Structural Systems Integrity Management

    DEFF Research Database (Denmark)

    Nielsen, Michael Havbro Faber

    2017-01-01

    The present paper is predominantly a conceptual contribution with an appraisal of major developments in risk informed structural integrity management for offshore installations together with a discussion of their merits and the challenges which still lie ahead. Starting point is taken in a selected...... overview of research and development contributions which have formed the basis for Risk Based Inspection Planning (RBI) as we know it today. Thereafter an outline of the methodical basis for risk informed structural systems integrity management, i.e. the Bayesian decision analysis is provided in summary....... The main focus is here directed on RBI for offshore facilities subject to fatigue damages. New ideas and methodical frameworks in the area of robustness and resilience modeling of structural systems are then introduced, and it is outlined how these may adequately be utilized to enhance Structural Integrity...

  4. Integrated Management System Incorporating Quality Management and Management of Environment, Health and Occupational Safety

    International Nuclear Information System (INIS)

    Manchev, B.; Nenkova, B.; Tomov, E.

    2012-01-01

    Risk Engineering Ltd is a Bulgarian private company founded in 1990 to provide engineering and consulting services applicable to each and every field of the energy sector. Since its establishment Risk Engineering Ltd develops, implement and apply a System for quality assurance, certified for the first time by BVQI (now Bureau Veritas Certification) in 1999 for conformity with the standard ISO 9001:1994. Later on, in connection with the revision of the standards of ISO 9000 series and introduction of the standard ISO 9001:2000 a Quality Management System in conformity with the standard ISO 9001:2000 was developed, introduced and certified. At present, Risk Engineering Ltd has got developed, documented, introduced and certified by Lloyd's Register Quality Assurance (LRQA) Quality Management System in compliance with ISO 9001:2008 on the process approach basis. On this basis and including the requirements of the ISO 14001:2004 (regarding the environment) and OHSAS 18001:2007 (regarding the health and occupational safety), Risk Engineering Ltd has developed and introduced Integrated Management System aim at achieving and demonstrating good results regarding protection of the environment, health and occupational safety. The processes under control by the Integrated Management System and applicable at the company are divided in two general types: A) Management processes: Strategic management and Management of the human resources. B) Processes describing the main activities: design/development process; project management; management of industrial projects and technical infrastructure project; construction, installation, repair and operation of power industry facilities; commercial activities and marketing; investigation of energy efficiency of industrial systems and certification of buildings regarding energy efficiency; consulting activity in the field of industry and energy as well as consultant in accordance with the Law of the Spatial Planning; management of the

  5. Integrating fire management into land management planning for west-side forests

    Science.gov (United States)

    Peter D. Teensma

    1996-01-01

    Fire management's integration into land management planning is critical to the successful management of nearly all wildland ecosystems, including westside forests, which lie west of the Cascade crest in Oregon and the northern coastal ranges in California. Restoration and maintenance of fire as an ecosystem process is critical to retention of biological diversity...

  6. Hanford Tanks Initiative requirements and document management process guide

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1998-01-01

    This revision of the guide provides updated references to project management level Program Management and Assessment Configuration Management activities, and provides working level directions for submitting requirements and project documentation related to the Hanford Tanks Initiative (HTI) project. This includes documents and information created by HTI, as well as non-HTI generated materials submitted to the project

  7. Integrated remotely sensed datasets for disaster management

    Science.gov (United States)

    McCarthy, Timothy; Farrell, Ronan; Curtis, Andrew; Fotheringham, A. Stewart

    2008-10-01

    Video imagery can be acquired from aerial, terrestrial and marine based platforms and has been exploited for a range of remote sensing applications over the past two decades. Examples include coastal surveys using aerial video, routecorridor infrastructures surveys using vehicle mounted video cameras, aerial surveys over forestry and agriculture, underwater habitat mapping and disaster management. Many of these video systems are based on interlaced, television standards such as North America's NTSC and European SECAM and PAL television systems that are then recorded using various video formats. This technology has recently being employed as a front-line, remote sensing technology for damage assessment post-disaster. This paper traces the development of spatial video as a remote sensing tool from the early 1980s to the present day. The background to a new spatial-video research initiative based at National University of Ireland, Maynooth, (NUIM) is described. New improvements are proposed and include; low-cost encoders, easy to use software decoders, timing issues and interoperability. These developments will enable specialists and non-specialists collect, process and integrate these datasets within minimal support. This integrated approach will enable decision makers to access relevant remotely sensed datasets quickly and so, carry out rapid damage assessment during and post-disaster.

  8. Integrated EAP/Managed Behavioral Health Plan Utilization by Persons with Substance Use Disorders

    Science.gov (United States)

    Levy Merrick, Elizabeth S.; Hodgkin, Dominic; Hiatt, Deirdre; Horgan, Constance M.; Greenfield, Shelly F.; McCann, Bernard

    2011-01-01

    New federal parity and health reform legislation, promising increased behavioral health care access and a focus on prevention, has heightened interest in employee assistance programs (EAPs). This study investigated service utilization by persons with a primary substance use disorder (SUD) diagnosis in a managed behavioral healthcare organization's integrated EAP/managed behavioral health care product (N=1,158). In 2004, 25.0% of clients used the EAP first for new treatment episodes. After initial EAP utilization, 44.4% received no additional formal services through the plan and 40.4% received regular outpatient services. Overall, outpatient care, intensive outpatient/day treatment, and inpatient/residential detoxification were most common. About half of clients had co-occurring psychiatric diagnoses. Mental health service utilization was extensive. Findings suggest that for service users with primary SUD diagnoses in an integrated EAP/MBHC product, the EAP benefit plays a key role at the front end of treatment and is often only one component of treatment episodes. PMID:21185684

  9. Optimal stability polynomials for numerical integration of initial value problems

    KAUST Repository

    Ketcheson, David I.; Ahmadia, Aron

    2013-01-01

    We consider the problem of finding optimally stable polynomial approximations to the exponential for application to one-step integration of initial value ordinary and partial differential equations. The objective is to find the largest stable step

  10. From industry to academia: Benefits of integrating a professional project management standard into (geo)science research

    Science.gov (United States)

    Cristini, Luisa

    2017-04-01

    Scientific and technological research carried out within universities and public research institutions often involves large collaborations across several countries. Despite the considerable budget (typically millions of Euros), the high expectations (high impact scientific findings, new technological developments and links with policy makers, industry and civil society) and the length of the project over several years, these international projects often rely heavily on the personal skills of the management team (project coordinator, project manager, principal investigators) without a structured, transferable framework. While this approach has become an established practice, it's not ideal and can jeopardise the success of the entire effort with consequences ranging from schedule delays, loss of templates/systems, financial charges and ultimately project failure. In this presentation I will show the advantages of integrating a globally recognised standard for professional project management, such as the PMP® by the Project Management Institute, into academic research. I will cover the project management knowledge areas (integration management, scope management, time management, cost management, quality management, human resources management, risk management, procurement management, and stakeholder management) and the processes within these throughout the phases of the project lifetime (project initiation, planning, executing, monitoring and controlling, and closure). I will show how application of standardised, transferable procedures, developed within the business & administration sector, can benefit academia and more generally scientific research.

  11. Export channel pricing management for integrated solutions

    OpenAIRE

    Roine, Henna; Sainio, Liisa-Maija; Saarenketo, Sami

    2012-01-01

    This article studies systems integrators' export channel pricing management for integrated solutions. We find support from our empirical case study for the notion that a systems integrator's export channel pricing strategy is multidimensional and dependent on international pricing environment and partner characteristics and that export partnerships have unique implications on a systems integrator's pricing process. The results show that giving up pricing control in export channel context may ...

  12. Integrated pest management and weed management in the United States and Canada.

    Science.gov (United States)

    Owen, Micheal D K; Beckie, Hugh J; Leeson, Julia Y; Norsworthy, Jason K; Steckel, Larry E

    2015-03-01

    There is interest in more diverse weed management tactics because of evolved herbicide resistance in important weeds in many US and Canadian crop systems. While herbicide resistance in weeds is not new, the issue has become critical because of the adoption of simple, convenient and inexpensive crop systems based on genetically engineered glyphosate-tolerant crop cultivars. Importantly, genetic engineering has not been a factor in rice and wheat, two globally important food crops. There are many tactics that help to mitigate herbicide resistance in weeds and should be widely adopted. Evolved herbicide resistance in key weeds has influenced a limited number of growers to include a more diverse suite of tactics to supplement existing herbicidal tactics. Most growers still emphasize herbicides, often to the exclusion of alternative tactics. Application of integrated pest management for weeds is better characterized as integrated weed management, and more typically integrated herbicide management. However, adoption of diverse weed management tactics is limited. Modifying herbicide use will not solve herbicide resistance in weeds, and the relief provided by different herbicide use practices is generally short-lived at best. More diversity of tactics for weed management must be incorporated in crop systems. © 2014 Society of Chemical Industry.

  13. Design of an integrated information management system for safe management of radioactive waste

    International Nuclear Information System (INIS)

    Son, Dong Chan; Hong, Suk Young; An, Kyoung Il

    2003-05-01

    An integrated data management system for the safe management of radioactive waste and spent fuel in Korea is developed to collect basic information, provide the framework for national regulation, and improve national competition and efficiency in the management of radioactive waste and spent fuel. This system can also provide public access to information such as a statistical graphs and integrated data from various waste generators to meet increased public needs and interests. Objectives can be summarized as: the five principles (independence, openness, clearance, efficiency and reliance) of safety regulation can be realized. Public understanding and reliance on the safety of spent fuel and radioactive waste management can be promoted by providing reliable information. Ensure an openness within the international nuclear community and efficiently support international agreements among contracting parties by operating safe and efficient management of spent fuel and radioactive waste (IAEA joint convention on the safety of spent fuel management and on the safety of radioactive waste management). The system can compensate for the imperfections in safe regulation of radioactive waste and spent fuel management related to waste generation, storage and disposal, and make it possible to holistic control. Re-organize the basic framework of KINS's intermediate and long term research organization and trends, regarding waste management policy is to integrate safe management and unit safe disposal

  14. Design of an integrated information management system for safe management of radioactive waste

    Energy Technology Data Exchange (ETDEWEB)

    Son, Dong Chan; Hong, Suk Young; An, Kyoung Il [Daesang Information Technology Co., Ltd., Seoul (Korea, Republic of)] (and others)

    2003-05-15

    An integrated data management system for the safe management of radioactive waste and spent fuel in Korea is developed to collect basic information, provide the framework for national regulation, and improve national competition and efficiency in the management of radioactive waste and spent fuel. This system can also provide public access to information such as a statistical graphs and integrated data from various waste generators to meet increased public needs and interests. Objectives can be summarized as: the five principles (independence, openness, clearance, efficiency and reliance) of safety regulation can be realized. Public understanding and reliance on the safety of spent fuel and radioactive waste management can be promoted by providing reliable information. Ensure an openness within the international nuclear community and efficiently support international agreements among contracting parties by operating safe and efficient management of spent fuel and radioactive waste (IAEA joint convention on the safety of spent fuel management and on the safety of radioactive waste management). The system can compensate for the imperfections in safe regulation of radioactive waste and spent fuel management related to waste generation, storage and disposal, and make it possible to holistic control. Re-organize the basic framework of KINS's intermediate and long term research organization and trends, regarding waste management policy is to integrate safe management and unit safe disposal.

  15. INNOVATION DEVELOPMENT MANAGEMENT IN VERTICALLY INTEGRATED HOLDING COMPANY

    Directory of Open Access Journals (Sweden)

    Natalya T. Uspenskaja

    2015-01-01

    Full Text Available The trend towards production consolidation and integration processes taking place both in the Russian and global economies leads to development of business associations, with a holding company being the most common form inRussiaand around the globe. The evidence in favor of the formation of holding companies is that they can benefit from the scale (bulk purchasing, centralized stuff training; in the global capital and exports markets they can be more effective than smaller businesses and, if non-profitable, a loss-making structure is easier to liquidate than the entire company; holding companies and associations can be an effective defender from political interference. As the importance of the well-functioning and harmonized procedure for the companies’ integration will increase (especially in the context of Russian business, where specific features of many areas of the production system imply the use of holding oligopolies as the most effective form of market structures, there is a need in their more profound study and, in particular, in the analysis of the most important technologies of the general integration procedure. The article outlines the relevance of innovative development management of vertically integrated holding systems, lists principles of innovative activity management and considers the features of innovation management of a vertically integrated holding company. The objective of the research is to study theoretical and practical aspects of innovative development management in vertically integrated holding systems. The object of research is management structures in innovative holding companies. While working on the article, the following methods of economic research were used: abstract and logical method, empirical method, method of expert evaluations, as well as methods of structural and functional and statistical analysis. 

  16. Application of the Integrated Site and Environment Data Management System for LILW Disposal Site

    International Nuclear Information System (INIS)

    Lee, Ji Hoon; Lee, Eun Yong; Kim, Chang Lak

    2007-01-01

    During the last five years, Site Information and Total Environmental data management System(SITES) has been developed. SITES is an integrated program for overall data acquisition, environmental monitoring, and safety analysis. SITES is composed of three main modules, such as site database system (SECURE), safety assessment system (SAINT) and environmental monitoring system (SUDAL). In general, for the safe management of radioactive waste repository, the information of site environment should be collected and managed systematically from the initial site survey. For this, SECURE module manages its data for the site characterization, environmental information, and radioactive environmental information etc. The purpose of SAINT module is to apply and analyze the data from SECURE. SUDAL is developed for environmental monitoring of the radioactive waste repository. Separately, it is ready to open to the public for offering partial information

  17. How Agile Methods Inspire Project Management - The Half Double Initiative

    DEFF Research Database (Denmark)

    Heeager, Lise Tordrup; Svejvig, Per; Schlichter, Bjarne Rerup

    Increased complexity in projects has forced new project management initiatives. In software development several agile methods have emerged and are today highly implemented in practice. Observations of general project management practice show how it has been inspired by agile software development......, but very little research addresses the issue of agile project management. In order to understand and to provide suggestions for future practice on how agility can be incorporated in general project management, this paper provides an analysis which compares ten characteristics of agile software development...... (identified in theory) and the Half Double Methodology developed by the Danish Project Half Double initiative; a Methodology developed with practitioners and tested in seven Danish case companies. The analysis shows how the general project management to a great extent has been inspired by agile methods...

  18. Defense Nuclear Material Stewardship Integrated Inventory Information Management System (IIIMS).

    Energy Technology Data Exchange (ETDEWEB)

    Aas, Christopher A.; Lenhart, James E.; Bray, Olin H.; Witcher, Christina Jenkin

    2004-11-01

    Sandia National Laboratories was tasked with developing the Defense Nuclear Material Stewardship Integrated Inventory Information Management System (IIIMS) with the sponsorship of NA-125.3 and the concurrence of DOE/NNSA field and area offices. The purpose of IIIMS was to modernize nuclear materials management information systems at the enterprise level. Projects over the course of several years attempted to spearhead this modernization. The scope of IIIMS was broken into broad enterprise-oriented materials management and materials forecasting. The IIIMS prototype was developed to allow multiple participating user groups to explore nuclear material requirements and needs in detail. The purpose of material forecasting was to determine nuclear material availability over a 10 to 15 year period in light of the dynamic nature of nuclear materials management. Formal DOE Directives (requirements) were needed to direct IIIMS efforts but were never issued and the project has been halted. When restarted, duplicating or re-engineering the activities from 1999 to 2003 is unnecessary, and in fact future initiatives can build on previous work. IIIMS requirements should be structured to provide high confidence that discrepancies are detected, and classified information is not divulged. Enterprise-wide materials management systems maintained by the military can be used as overall models to base IIIMS implementation concepts upon.

  19. Supply Chain Management and Business Sustainability Synergy: A Theoretical and Integrated Perspective

    Directory of Open Access Journals (Sweden)

    Zabihollah Rezaee

    2018-01-01

    Full Text Available Global business organizations face the challenges of adapting proper sustainability strategies and practices to effectively respond to social, ethical, environmental, and governance issues while improving financial performance in creating value for their shareholders. Business sustainability enables the integration of financial economic sustainability performance and non-financial environmental, social, ethical, and governance sustainability performance dimensions into the corporate culture, supply chain management and business models in creating shared value for all stakeholders. Business literature has provided mixed evidence of the tension, and possible link, between financial and non-financial sustainability performance dimensions and sustainability theories have yet to sufficiently address this tension. This paper attempts to fill this void by shedding light on the link between various dimensions of sustainability performance, their integrated effect on creating shared value for all stakeholders and their implications for supply chain sustainability. This paper examines the synergy between business sustainability and supply chain management by presenting a framework consisting of sustainability theories, sustainability performance dimensions, sustainability shared value concept, and sustainability best practices. Companies can use the suggested framework in integrating both financial and non-financial sustainability initiatives into their supply chain sustainability from production design, purchasing and inbound logistics, and manufacturing process to distribution and outbound logistics.

  20. IWRM Policy in Colombia, drawbacks and strategies towards integration

    Science.gov (United States)

    Cardona, C. A.

    2016-12-01

    Since the establishment of the Integrated Water Resource Management National Policy in Colombia in 2010- IWRMNP, several initiatives has been developed in order to understand and manage water within the integration perspective. However, the Colombian institutional and legal frameworks do not favor the implementation of integrated management exercises, and many efforts have been fruitless in recent years. Additionally, there is an avalanche of techniques and available technologies to develop integrated models, analysis or assessments, which frequently are interpreted as the same tool. An analysis of the Colombian context in regulatory terms and institutions involved is carried out, as a prelude to address the topic of analysis modeling and integrated management. Moreover, in Colombian legislation there exists policies regarding integrated soil management, integrated biodiversity management, as well as several current international trends such as integrated landscape planning, integrated urban areas management etc. Therefore, and in light of the initial analysis, a discussion of redundancy or complementarity of such management it is carried out. Finally, a strategy is proposed for decision makers of local and regional level, trying to overcome technical gaps left by national policy and regulations. This is done from a discussion of the various anthropic damages to water resources systems. Also a classification of integrated models is proposed and a general approach to systems integrated resource management to finally present a state- management matrix methodology applicable to different cases and management requirements. The results of its implementation in a small basin is presented.

  1. Improve data integration performance by employing metadata management utility

    Energy Technology Data Exchange (ETDEWEB)

    Wei, M.; Sung, A.H. [New Mexico Petroleum Recovery Research Center, Socorro, NM (United States)

    2005-07-01

    This conference paper explored ways of integrating petroleum and exploration data obtained from different sources in order to provide more comprehensive data for various analysis purposes and to improve the integrity and consistency of integrated data. This paper proposes a methodology to enhance oil and gas industry data integration performance by cooperating data management utilities in Microsoft SQL Server database management system (DBMS) for small scale data integration without support of commercial software. By semi-automatically capturing metadata, data sources are investigated in detail, data quality problems are partially cleansed, and the performance of data integration is improved. 20 refs., 7 tabs., 1 fig.

  2. Integrating cost management and work management concepts for operations

    International Nuclear Information System (INIS)

    Vanditmars, C.

    1995-01-01

    Development of B C Gas Utility Limited's integrated work and cost management system was described, with emphasis on cost management without reliance on the financial systems, and standard costing and operational side benefits. The objectives of the system were identified as dynamic monitoring and control, and local empowerment. The concept underlying the two systems was explained in detail. In the case of the work management system the ability to manage all work in operations areas was stressed, along with its universal availability. Other benefits expected included improved resource utilization, improved productivity, better control of cost, improved revenue generation, superior customer service, a simplified financial system, and improved employee motivation through empowerment

  3. Estimating the Benefits of the Air Force Purchasing and Supply Chain Management Initiative

    Science.gov (United States)

    2008-01-01

    sector, known as strategic sourcing.6 The Customer Relationship Management initiative ( CRM ) pro- vides a single customer point of contact for all... Customer Relationship Management initiative. commodity council A term used to describe a cross-functional sourc- ing group charged with formulating a...initiative has four major components, all based on commercial best practices (Gabreski, 2004): commodity councils customer relationship management

  4. Integrated software system for low level waste management

    International Nuclear Information System (INIS)

    Worku, G.

    1995-01-01

    In the continually changing and uncertain world of low level waste management, many generators in the US are faced with the prospect of having to store their waste on site for the indefinite future. This consequently increases the set of tasks performed by the generators in the areas of packaging, characterizing, classifying, screening (if a set of acceptance criteria applies), and managing the inventory for the duration of onsite storage. When disposal sites become available, it is expected that the work will require re-evaluating the waste packages, including possible re-processing, re-packaging, or re-classifying in preparation for shipment for disposal under the regulatory requirements of the time. In this day and age, when there is wide use of computers and computer literacy is at high levels, an important waste management tool would be an integrated software system that aids waste management personnel in conducting these tasks quickly and accurately. It has become evident that such an integrated radwaste management software system offers great benefits to radwaste generators both in the US and other countries. This paper discusses one such approach to integrated radwaste management utilizing some globally accepted radiological assessment software applications

  5. DNFSB recommendation 94-1 Hanford site integrated stabilization management plan

    Energy Technology Data Exchange (ETDEWEB)

    McCormack, R.L.

    1997-05-07

    In May 1994, the Defense Nuclear Facilities Safety Board (DNFSB) issued DNFSB Recommendation 94-1 (Conway 1994), which identified concerns related to US Department of Energy (DOE) management of legacy fissile materials remaining from past defense production activities. The DNFSB expressed concern about the existing storage conditions for these materials and the slow pace at which the conditions were being remediated. The DNFSB also expressed its belief that additional delays in stabilizing these fissile materials would be accompanied by further deterioration of safety and unnecessary increased risks to workers and the public. In February 1995, DOE issued the DNFSB Recommendation 94-1 Implementation Plan (O`Leary 1995) to address the concerns identified in DNFSB Recommendation 94-1. The Implementation Plan (IP) identifies several DOE commitments to achieve safe interim storage for the legacy fissile materials, and constitutes DOE`s baseline DNFSB Recommendation 94-1 Integrated Program Plan (IPP). The IPP describes the actions DOE plans to implement within the DOE complex to convert its excess fissile materials to forms or conditions suitable for safe interim storage. The IPP was subsequently supplemented with an Integrated Facilities Plan and a Research and Development Plan, which further develop complex-wide research and development and long-range facility requirements and plans. The additions to the baseline IPP were developed based on a systems engineering approach that integrated facilities and capabilities at the various DOE sites and focused on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the DNFSB Recommendation 94-1 IP. The SISMPs also supported

  6. DNFSB recommendation 94-1 Hanford site integrated stabilization management plan

    International Nuclear Information System (INIS)

    McCormack, R.L.

    1997-01-01

    In May 1994, the Defense Nuclear Facilities Safety Board (DNFSB) issued DNFSB Recommendation 94-1 (Conway 1994), which identified concerns related to US Department of Energy (DOE) management of legacy fissile materials remaining from past defense production activities. The DNFSB expressed concern about the existing storage conditions for these materials and the slow pace at which the conditions were being remediated. The DNFSB also expressed its belief that additional delays in stabilizing these fissile materials would be accompanied by further deterioration of safety and unnecessary increased risks to workers and the public. In February 1995, DOE issued the DNFSB Recommendation 94-1 Implementation Plan (O'Leary 1995) to address the concerns identified in DNFSB Recommendation 94-1. The Implementation Plan (IP) identifies several DOE commitments to achieve safe interim storage for the legacy fissile materials, and constitutes DOE's baseline DNFSB Recommendation 94-1 Integrated Program Plan (IPP). The IPP describes the actions DOE plans to implement within the DOE complex to convert its excess fissile materials to forms or conditions suitable for safe interim storage. The IPP was subsequently supplemented with an Integrated Facilities Plan and a Research and Development Plan, which further develop complex-wide research and development and long-range facility requirements and plans. The additions to the baseline IPP were developed based on a systems engineering approach that integrated facilities and capabilities at the various DOE sites and focused on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the DNFSB Recommendation 94-1 IP. The SISMPs also supported

  7. Migration of the Almaraz NPP integrated operation management system to a new computer platform

    International Nuclear Information System (INIS)

    Gonzalez Crego, E.; Martin Lopez-Suevos, C.

    1996-01-01

    In all power plants, it becomes necessary, with the passage of time, to migrate the initial operation management systems to adapt them to current technologies. That is a good time to improve the inclusion of data in the corporative database and standardize the system interfaces and operation, whilst maintaining data system operability. This article contains Almaraz experience in migrating its Integrated Operation Management System to an advanced computer platform based on open systems (UNIX), communications network (ETHERNET) and database (ORACLE). To this effect, clear objectives and strict standards were established to facilitate the work. The most noteworthy results obtained are: Better quality of information and structure in the corporative database Standardised user interface in all applications. Joint migration of applications for Maintenance, Components and Spare parts, Warehouses and Purchases. Integration of new applications into the system. Introduction of the navigator, which allows movement around the database using all available applications. (Author)

  8. The GENiC architecture for integrated data centre energy management

    NARCIS (Netherlands)

    Pesch, D.; McGibney, A.; Sobonski, P.; Rea, S.; Scherer, Th.; Chen, L.; Engbersen, T.; Mehta, D.; O'Sullivan, B.; Pages, E.; Townley, J.; Kasinathan, Dh.; Torrens, J.I.; Zavrel, V.; Hensen, J.L.M.

    2015-01-01

    We present an architecture for integrated data centre energy management developed in the EC funded GENiC project. The architecture was devised to create a platform that can integrate functions for workload management, cooling, power management and control of heat recovery for future, highly

  9. IM (Integrity Management) software must show flexibility to local codes

    Energy Technology Data Exchange (ETDEWEB)

    Brors, Markus [ROSEN Technology and Research Center GmbH (Germany); Diggory, Ian [Macaw Engineering Ltd., Northumberland (United Kingdom)

    2009-07-01

    There are many internationally recognized codes and standards, such as API 1160 and ASME B31.8S, which help pipeline operators to manage and maintain the integrity of their pipeline networks. However, operators in many countries still use local codes that often reflect the history of pipeline developments in their region and are based on direct experience and research on their pipelines. As pipeline companies come under increasing regulatory and financial pressures to maintain the integrity of their networks, it is important that operators using regional codes are able to benchmark their integrity management schemes against these international standards. Any comprehensive Pipeline Integrity Management System (PIMS) software package should therefore not only incorporate industry standards for pipeline integrity assessment but also be capable of implementing regional codes for comparison purposes. This paper describes the challenges and benefits of incorporating one such set of regional pipeline standards into ROSEN Asset Integrity Management Software (ROAIMS). (author)

  10. From Indoctrination to Initiation: A Non-Coercive Approach to Faith-Learning Integration

    Science.gov (United States)

    Reichard, Joshua D.

    2013-01-01

    This article contributes to ongoing discussions related to the nature, scope, and methods of faith-learning integration. The "initiation" approach developed by Tim McDonough (2011) is adapted to faith-learning integration in an attempt to bridge polarizing discussions regarding indoctrination versus rational autonomy and critical…

  11. An Integrated Knowledge Management System

    Directory of Open Access Journals (Sweden)

    Vasile Mazilescu

    2014-11-01

    Full Text Available The aim of this paper is to present a Knowledge Management System based on Fuzzy Logic (FLKMS, a real-time expert system to meet the challenges of the dynamic environment. The main feature of our integrated shell FLKMS is that it models and integrates the temporal relationships between the dynamic of the evolution of an economic process with some fuzzy inferential methods, using a knowledge model for control, embedded within the expert system’s operational knowledge base.

  12. Science of Integrated Approaches to Natural Resources Management

    Science.gov (United States)

    Tengberg, Anna; Valencia, Sandra

    2017-04-01

    To meet multiple environmental objectives, integrated programming is becoming increasingly important for the Global Environmental Facility (GEF), the financial mechanism of the multilateral environmental agreements, including the United Nations Convention to Combat Desertification (UNCCD). Integration of multiple environmental, social and economic objectives also contributes to the achievement of the Sustainable Development Goals (SDGs) in a timely and cost-effective way. However, integration is often not well defined. This paper therefore focuses on identifying key aspects of integration and assessing their implementation in natural resources management (NRM) projects. To that end, we draw on systems thinking literature, and carry out an analysis of a random sample of GEF integrated projects and in-depth case studies demonstrating lessons learned and good practices in addressing land degradation and other NRM challenges. We identify numerous challenges and opportunities of integrated approaches that need to be addressed in order to maximise the catalytic impact of the GEF during problem diagnosis, project design, implementation and governance. We highlight the need for projects to identify clearer system boundaries and main feedback mechanisms within those boundaries, in order to effectively address drivers of environmental change. We propose a theory of change for Integrated Natural Resources Management (INRM) projects, where short-term environmental and socio-economic benefits will first accrue at the local level. Implementation of improved INRM technologies and practices at the local level can be extended through spatial planning, strengthening of innovation systems, and financing and incentive mechanisms at the watershed and/or landscape/seascape level to sustain and enhance ecosystem services at larger scales and longer time spans. We conclude that the evolving scientific understanding of factors influencing social, technical and institutional innovations and

  13. Integrated Approach to User Account Management

    Science.gov (United States)

    Kesselman, Glenn; Smith, William

    2007-01-01

    IT environments consist of both Windows and other platforms. Providing user account management for this model has become increasingly diffi cult. If Microsoft#s Active Directory could be enhanced to extend a W indows identity for authentication services for Unix, Linux, Java and Macintosh systems, then an integrated approach to user account manag ement could be realized.

  14. The tortoise shell Integrated Coastal Management in Galapagos

    OpenAIRE

    Polit Arguello, Victor Manuel

    2013-01-01

    The current work aims to examine the legal framework for Integrated Coastal Management for Archipelago de Galapagos. It examines the content of ICM at the internal level in order to find if there is a standard for appropriate Integrated Management of Coastal Zones. Also it aims to define whether the ratification of UNCLOS by the government of Ecuador should affect the implementation of such framework.

  15. Integrated Solution Support System for Water Management

    NARCIS (Netherlands)

    Kassahun, A.; Blind, M.; Krause, A.U.M.; Roosenschoon, O.R.

    2008-01-01

    Solving water management problems involves technical, social, economic, political and legal challenges and thus requires an integrated approach involving people from different backgrounds and roles. The integrated approach has been given a prominent role within the European Union¿s Water Framework

  16. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  17. Intellectual capital management as the integral part of enterprise’s management

    OpenAIRE

    Аліна Олександрівна Осаул

    2016-01-01

    The main levels of the enterprise’s intellectual capital management are analyzed in the article. The distinctive peculiarities of the enterprise’s intellectual capital management are mentioned. Goals and benefits of the intellectual management system are determined. The ways of their improvement are pointed out. Implicit and explicit knowledge as an important integral intellectual capital resources are divided and characterized

  18. Managing Key Risks in Post-Merger IS Integration

    DEFF Research Database (Denmark)

    Alaranta, Mar; Mathiassen, L

    2014-01-01

    Mergers and acquisitions (M&A) require organizations to blend together different information system (IS) configurations. Unfortunately, less than 50 percent of M&A's achieve their goals, with IS integration being a major problem. Here, the authors offer a framework to help managers prepare for......, analyze, and mitigate risks during post-merger IS integration. They identify key risks relating to IS integration content, process, and context, and present five strategies for mitigating those risks. Their framework aims to help managers proactively reduce the impact of adverse events. Adopting...... the framework supported by their templates is straightforward and the time and resources required are minimal. When properly executed, adoption increases the likelihood of successful merger outcomes; the framework is thus a valuable addition to the management tool box and can be applied in collaboration...

  19. THE MANAGEMENT ACCOUNTING TOOLS AND THE INTEGRATED REPORTING

    Directory of Open Access Journals (Sweden)

    Gabriel JINGA

    2015-04-01

    Full Text Available During the recent years the stakeholders are asking for other pieces of information to be published along with the financial one, such as risk reporting, intangibles, social and environmental accounting. The type of corporate reporting which incorporates the elements enumerated above is the integrated reporting. In this article, we argue that the information disclosed in the integrated reports is prepared by the management accounting, not only by the financial accounting. Thus, we search for the management accounting tools which are used by the companies which prepare integrated reports. In order to do this, we analytically reviewed all the reports available on the website of a selected company. Our results show that the company is using most of the management accounting tools mentioned in the literature review part.

  20. CORPORATIVE MOTIVES ON IMPLEMENTATION OF INTEGRATED MANAGEMENT SYSTEM (IMS

    Directory of Open Access Journals (Sweden)

    Dragan Rajkovic

    2009-09-01

    Full Text Available Integration of management systems for quality, environment, health and risk management as well as corporative social responsibilities is workable corporative approach to reduce costs, effective use of resources, higher motivation of employees and better fulfillment of requirements of social engagements and stakeholders. This paper presents contents of literature and review of a company motives on integrated management system (IMS implementation, namely factors affecting the IMS implementation.

  1. Integration of operational research and environmental management

    NARCIS (Netherlands)

    Bloemhof - Ruwaard, J.M.

    1996-01-01


    The subject of this thesis is the integration of Operational Research and Environmental Management. Both sciences play an important role in the research of environmental issues. Part I describes a framework for the interactions between Operational Research and Environmental Management.

  2. Integrated Financial Management Program

    Science.gov (United States)

    Pho, Susan

    2004-01-01

    Having worked in the Employees and Commercial Payments Branch of the Financial Management Division for the past 3 summers, I have seen the many changes that have occurred within the NASA organization. As I return each summer, I find that new programs and systems have been adapted to better serve the needs of the Center and of the Agency. The NASA Agency has transformed itself the past couple years with the implementation of the Integrated Financial Management Program (IFMP). IFMP is designed to allow the Agency to improve its management of its Financial, Physical, and Human Resources through the use of multiple enterprise module applications. With my mentor, Joseph Kan, being the branch chief of the Employees and Commercial Payments Branch, I have been exposed to several modules, such as Travel Manager, WebTads, and Core Financial/SAP, which were implemented in the last couple of years under the IFMP. The implementation of these agency-wide systems has sometimes proven to be troublesome. Prior to IFMP, each NASA Center utilizes their own systems for Payroll, Travel, Accounts Payable, etc. But with the implementation of the Integrated Financial Management Program, all the "legacy" systems had to be eliminated. As a result, a great deal of enhancement and preparation work is necessary to ease the transformation from the old systems to the new. All this work occurs simultaneously; for example, e-Payroll will "go live" in several months, but a system like Travel Manager will need to have information upgraded within the system to meet the requirements set by Headquarters. My assignments this summer have given me the opportunity to become involved with such work. So far, I have been given the opportunity to participate in projects resulting from a congressional request, several bankcard reconciliations, updating routing lists for Travel Manager, updating the majordomo list for Travel Manager approvers and point of contacts, and a NASA Headquarters project involving

  3. Integrating adaptive management and ecosystem services concepts to improve natural resource management: Challenges and opportunities

    Science.gov (United States)

    Epanchin-Niell, Rebecca S.; Boyd, James W.; Macauley, Molly K.; Scarlett, Lynn; Shapiro, Carl D.; Williams, Byron K.

    2018-05-07

    Executive Summary—OverviewNatural resource managers must make decisions that affect broad-scale ecosystem processes involving large spatial areas, complex biophysical interactions, numerous competing stakeholder interests, and highly uncertain outcomes. Natural and social science information and analyses are widely recognized as important for informing effective management. Chief among the systematic approaches for improving the integration of science into natural resource management are two emergent science concepts, adaptive management and ecosystem services. Adaptive management (also referred to as “adaptive decision making”) is a deliberate process of learning by doing that focuses on reducing uncertainties about management outcomes and system responses to improve management over time. Ecosystem services is a conceptual framework that refers to the attributes and outputs of ecosystems (and their components and functions) that have value for humans.This report explores how ecosystem services can be moved from concept into practice through connection to a decision framework—adaptive management—that accounts for inherent uncertainties. Simultaneously, the report examines the value of incorporating ecosystem services framing and concepts into adaptive management efforts.Adaptive management and ecosystem services analyses have not typically been used jointly in decision making. However, as frameworks, they have a natural—but to date underexplored—affinity. Both are policy and decision oriented in that they attempt to represent the consequences of resource management choices on outcomes of interest to stakeholders. Both adaptive management and ecosystem services analysis take an empirical approach to the analysis of ecological systems. This systems orientation is a byproduct of the fact that natural resource actions affect ecosystems—and corresponding societal outcomes—often across large geographic scales. Moreover, because both frameworks focus on

  4. Development and implementation of integrated management system

    International Nuclear Information System (INIS)

    Tomov, E.; Nenkova, B.

    2013-01-01

    Risk Engineering Ltd is a private Bulgarian company in the field of scientific technical consultancy and engineering services, established in 1990. The aim of this report is to present the experience of Risk Engineering Ltd. in the development, implementation and operation of an integrated management system. The process of implementation of the system was completed at the end of 2011. In January 2012, the Risk Engineering Integrated Management System was certified by Lloyd's Register for compliance with standards ISO 9001:2008, ISO 140001:2004 and BS OHSAS 18001:2007

  5. Total Quality Management and Organizational Behavior Management: An Integration for Continual Improvement.

    Science.gov (United States)

    Mawhinney, Thomas C.

    1992-01-01

    The history and main features of organizational behavior management (OBM) are compared and integrated with those of total quality management (TQM), with emphasis on W.E. Deming's 14 points and OBM's operant-based approach to performance management. Interventions combining OBM, TQM, and statistical process control are recommended. (DB)

  6. Finding Practical Approaches to Integrated Water Resources Management

    Directory of Open Access Journals (Sweden)

    John Butterworth

    2010-02-01

    Full Text Available Integrated Water Resources Management (IWRM has often been interpreted and implemented in a way that is only really suited to countries with the most developed water infrastructures and management capacities. While sympathetic to many of the criticisms levelled at the IWRM concept and recognising the often disappointing levels of adoption, this paper and the series of papers it introduces identify some alternative ways forward in a developmental context that place more emphasis on the practical in-finding solutions to water scarcity. A range of lighter, more pragmatic and context-adapted approaches, strategies and entry points are illustrated with examples from projects and initiatives in mainly 'developing' countries. The authors argue that a more service-orientated (WASH, irrigation and ecosystem services, locally rooted and balanced approach to IWRM that better matches contexts and capacities should build on such strategies, in addition to the necessary but long-term policy reforms and river basin institution-building at higher levels. Examples in this set of papers not only show that the 'lighter', more opportunistic and incremental approach has potential as well as limitations but also await wider piloting and adoption.

  7. The development of pipeline integrity management in the world and practice in China

    Energy Technology Data Exchange (ETDEWEB)

    Shaohua, Dong; Qing, Wang; Feifan [China National Petroleum Corporation (CNPC), Beijing (China)

    2009-07-01

    The paper analyzed the pipeline integrity management latest development, and the relationship among HSE management, pipeline integrity management (PIM) and asset integrity management (AIM). CNPC is a pioneer of China industry on implementation of pipeline integrity management by using latest developed technologies such as in-line inspection, GIS, Risk assessment and advanced repair technologies, and it is typical model of PIM in China pipeline who supply the gas to whole Beijing city. With smart pigging inspection and implementation of GIS and EAM(enterprise assets management) system on two thousand kilometers of Shaanxi-Beijing gas pipeline BHGC is able to manage pipeline integrity in five areas which include pipe materials safety, nature and geotechnical hazards management, coating and corrosion protection, stationing and associated facilities maintenance, and underground gas storage integrity. This paper presents latest achievement of BHGC in their pipeline integrity programs. (author)

  8. A Review of Ocean Management and Integrated Resource Management Programs from Around the World

    OpenAIRE

    , Seaplan

    2018-01-01

    This draft report is one of several prepared under contract to the Massachusetts Ocean Partnership (MOP) to support the Massachusetts Executive Office of Energy and Environmental Affairs (EOEEA) in its development of the integrated coastal ocean management plan mandated by the Massachusetts Oceans Act of 2008. The purpose of this report was to inventory and review ocean management and integrated resource management programs from around the world, including the United States, Europe, Australia...

  9. Information for Child Care Providers about Pesticides/Integrated Pest Management

    Science.gov (United States)

    Learn about pesticides/integrated pest management, the health effects associated with exposure to pests and pesticides, and the steps that can be taken to use integrated pest management strategies in childcare facilities.

  10. Integrating Environmental Management of Asthma into Pediatric Health Care: What Worked and What Still Needs Improvement?

    Science.gov (United States)

    Roberts, James R; Newman, Nicholas; McCurdy, Leyla E; Chang, Jane S; Salas, Mauro A; Eskridge, Bernard; De Ybarrondo, Lisa; Sandel, Megan; Mazur, Lynnette; Karr, Catherine J

    2016-12-01

    The National Environmental Education Foundation (NEEF) launched an initiative in 2005 to integrate environmental management of asthma into pediatric health care. This study, a follow-up to a 2013 study, evaluated the program's impact and assessed training results by 5 new faculty champions. We surveyed attendees at training sessions to measure knowledge and the likelihood of asking about and managing environmental triggers of asthma. To conduct the program evaluation, a workshop was held with the faculty champions and NEEF staff in which we identified major program benefits, as well as challenges and suggestions for the future. Trainee baseline knowledge of environmental triggers was low, but they reported robust improvement in environmental triggers knowledge and intention to recommend environmental management. The program has a broad, national scope, reaching more than 12 000 physicians, health care providers, and students, and some faculty champions successfully integrated materials into health record. Program barriers and future endeavors were identified.

  11. The role of business information management in advanced integrated environmental management systems

    DEFF Research Database (Denmark)

    Ulhøi, John Parm

    2000-01-01

    investments in the individual company. Secondly, based on the above, to calculate and assess some typical quantifiable savings, e.g. on energy and raw materials, over a period of four years (after the implementation of the integrated environmental management system). In line with other similar investigations......, the study shows that the implementation of systematic and integrated environmental management systems results in significant savings. This supports the general, albeit rarely tested, hypothesis that it pays to be an environmentally responsible enterprise....

  12. Integrated disease management: a critical review of foreign and Portuguese experience.

    Science.gov (United States)

    Coelho, Anabela; Leone, Cláudia; Ribeiro, Vanessa; Sá Moreira, Pedro; Dussault, Gilles

    2014-01-01

    The present article reviews findings from empirical evaluations of integrated disease management programmes. The objective is to provide insights on integration levels, priority interventions and their effect on patient outcomes. The literature review identified 1 251 articles, published from 2006 to 2011. Upon a detailed screening 61 articles were selected for bibliometric analysis and critical discussion. Among several findings, it can be noted that United States of America is the country with the highest amount of published evidence on the subject under study. The most frequently referred disease is diabetes mellitus and the main reported issue of integrated disease management is self-management support. The majority of the studies were developed and exclusively managed by managed care organizations, organized family doctors or hospitals. From a total of 360 interventions reported in studies, patient interventions are the most frequently used across all disease groups, followed by professional interventions. To monitor the effectiveness of the disease programmes, the most frequently used outcomes are patient physiological measures, service use and patient health status. Every country has its own way to implement the integrated disease management strategy. The focus of practice lies on patient empowerment, particularly through self-management. Physiological measures and service use are the outcomes with the highest rate of assessment, which are also the indicators that show higher impact among all integrated disease management programmes. The Portuguese health care system still faces challenges in the coordination and integration of care for patients with chronic disease thus improvements at integrated disease management programmes should be incorporate.

  13. Using remote sensing to inform integrated coastal zone management

    CSIR Research Space (South Africa)

    Roberts, W

    2010-06-01

    Full Text Available TO INFORM INTERGRATED COASTAL ZONE MANAGEMENT GISSA Western Cape Regional Meeting Wesley Roberts & Melanie Luck-Vogel 2 June 2010 CSIR NRE Ecosystems Earth Observation Group What is Integrated Coastal Zone Management? Integrated coastal management... D1D1 B a n d 1 Band 2 Quick theory of CVA Magnitude Direction ( ) ( )22 xaxbyaybM ?+?= Quadrant 1 (++) Accretion Quadrant 2 (-+) Quadrant 4 (+-) Quadrant 3 (--) Erosion CVA Results & Conclusions ? Change in image time series...

  14. Integrating Records Management (RM) and Information Technology (IT)

    Energy Technology Data Exchange (ETDEWEB)

    NUSBAUM,ANNA W.; CUSIMANO,LINDA J.

    2000-03-02

    Records Managers are continually exploring ways to integrate their services with those offered by Information Technology-related professions to capitalize on the advantages of providing customers a total solution to managing their records and information. In this day and age, where technology abounds, there often exists a fear on the part of records management that this integration will result in a loss of identity and the focus of one's own mission - a fear that records management may become subordinated to the fast-paced technology fields. They need to remember there is strength in numbers and it benefits RM, IT, and the customer when they can bring together the unique offerings each possess to reach synergy for the benefit of all the corporations. Records Managers, need to continually strive to move ''outside the records management box'', network, expand their knowledge, and influence the IT disciplines to incorporate the concept of ''management'' into their customer solutions.

  15. Management Control System Support of Initiatives for Disruptive Students

    Science.gov (United States)

    Scott, Colin

    2011-01-01

    Purpose: The purpose of the paper is to investigate the management control system (MCS) support of school initiatives to develop the school climate and to re-engage disruptive students. Design/methodology/approach: The paper adopts an approach of critical action research interviews with management and document reviews informed by Habermasian…

  16. Paradise nearly Gained. Volume 1: Developing the Frontline Management Initiative.

    Science.gov (United States)

    Barratt-Pugh, Llandis; Soutar, Geoffrey N.

    The Frontline Management Initiative (FMI) provides a framework for competency-based development of frontline managers in Australian enterprises. The FMI's impact on businesses was examined in a national study that included the following activities: focus groups; a national survey of management development and targeted national survey of FMI users;…

  17. New Internet Business Initiatives in the Context of Change Management

    Directory of Open Access Journals (Sweden)

    Adam Sofronijević

    2015-05-01

    Full Text Available The paper presents the changing role of the Internet as a framework of several new business initiatives. In the last five years the Internet has evolved from being just a useful tool to a force shaping business strategies and influencing long-term managerial decision making. The paper presents an analysis of several cutting edge business initiatives and relates the success opportunities they have with evolving features of the Internet. The growth of importance of the Internet stresses the need to evaluate the state of local ICT development and precise data in this area for successful new business initiatives and meaningful change management. The paper presents the importance of such an evaluation for engaging change management that may be the crucial factor for the future of business initiatives in the era of ubiquitous, smart Internet.

  18. Design of the Hospital Integrated Information Management System Based on Cloud Platform.

    Science.gov (United States)

    Aijing, L; Jin, Y

    2015-12-01

    At present, the outdated information management style cannot meet the needs of hospital management, and has become the bottleneck of hospital's management and development. In order to improve the integrated management of information, hospitals have increased their investment in integrated information management systems. On account of the lack of reasonable and scientific design, some hospital integrated information management systems have common problems, such as unfriendly interface, poor portability and maintainability, low security and efficiency, lack of interactivity and information sharing. To solve the problem, this paper carries out the research and design of a hospital information management system based on cloud platform, which can realize the optimized integration of hospital information resources and save money.

  19. Co-Leadership - A Management Solution for Integrated Health and Social Care.

    Science.gov (United States)

    Klinga, Charlotte; Hansson, Johan; Hasson, Henna; Sachs, Magna Andreen

    2016-05-23

    Co-leadership has been identified as one approach to meet the managerial challenges of integrated services, but research on the topic is limited. In the present study, co-leadership, practised by pairs of managers - each manager representing one of the two principal organizations in integrated health and social care services - was explored. To investigate co-leadership in integrated health and social care, identify essential preconditions in fulfilling the management assignment, its operationalization and impact on provision of sustainable integration of health and social care. Interviews with eight managers exercising co-leadership were analysed using directed content analysis. Respondent validation was conducted through additional interviews with the same managers. Key contextual preconditions were an organization-wide model supporting co-leadership and co-location of services. Perception of the management role as a collective activity, continuous communication and lack of prestige were essential personal and interpersonal preconditions. In daily practice, office sharing, being able to give and take and support each other contributed to provision of sustainable integration of health and social care. Co-leadership promoted robust management by providing broader competence, continuous learning and joint responsibility for services. Integrated health and social care services should consider employing co-leadership as a managerial solution to achieve sustainability.

  20. Ground Operations Autonomous Control and Integrated Health Management

    Science.gov (United States)

    Daniels, James

    2014-01-01

    The Ground Operations Autonomous Control and Integrated Health Management plays a key role for future ground operations at NASA. The software that is integrated into this system is called G2 2011 Gensym. The purpose of this report is to describe the Ground Operations Autonomous Control and Integrated Health Management with the use of the G2 Gensym software and the G2 NASA toolkit for Integrated System Health Management (ISHM) which is a Computer Software Configuration Item (CSCI). The decision rationale for the use of the G2 platform is to develop a modular capability for ISHM and AC. Toolkit modules include knowledge bases that are generic and can be applied in any application domain module. That way, there's a maximization of reusability, maintainability, and systematic evolution, portability, and scalability. Engine modules are generic, while application modules represent the domain model of a specific application. Furthermore, the NASA toolkit, developed since 2006 (a set of modules), makes it possible to create application domain models quickly, using pre-defined objects that include sensors and components libraries for typical fluid, electrical, and mechanical systems.

  1. Integrated Foreign Exchange Risk Management

    DEFF Research Database (Denmark)

    Aabo, Tom; Høg, Esben; Kuhn, Jochen

    Empirical research has focused on export as a proxy for the exchange rate exposure and the use of foreign exchange derivatives as the instrument to deal with this exposure. This empirical study applies an integrated foreign exchange risk management approach with a particular focus on the role...

  2. 13 CFR 108.140 - SBA approval of initial Management Expenses.

    Science.gov (United States)

    2010-01-01

    ... VENTURE CAPITAL (âNMVCâ) PROGRAM Qualifications for the NMVC Program Organizing A Nmvc Company § 108.140 SBA approval of initial Management Expenses. A NMVC Company must have its Management Expenses approved by SBA at the time of designation as a NMVC Company. (See § 108.520 for the definition of Management...

  3. Agro-environmental evaluation of vineyard management using organic farming and integrated plant production systems

    OpenAIRE

    FORGET, D.; LACOMBE, J.; DURAND, A.

    2009-01-01

    Organic farming is often considered to be the most environmentally-friendly crop management system, even if integrated production also aims at decreasing the impact of agriculture on the natural environment. In order to establish references for the agro-environmental evaluation of these two production systems in relation to grape growing, INRA carried out an initial study from 2001 to 2004 at the plot scale. This study focused on two grape varieties (Merlot N and Cabernet Sauvignon) in its Co...

  4. Integrating school-based and therapeutic conflict management models at schools.

    Science.gov (United States)

    D'Oosterlinck, Franky; Broekaert, Eric

    2003-08-01

    Including children with emotional and behavioral needs in mainstream school systems leads to growing concern about the increasing number of violent and nonviolent conflicts. Schools must adapt to this evolution and adopt a more therapeutic dimension. This paper explores the possibility of integrating school-based and therapeutic conflict management models and compares two management models: a school-based conflict management program. Teaching Students To Be Peacemakers; and a therapeutic conflict management program, Life Space Crisis Intervention. The authors conclude that integration might be possible, but depends on establishing a positive school atmosphere, the central position of the teacher, and collaborative and social learning for pupils. Further implementation of integrated conflict management models can be considered but must be underpinned by appropriate scientific research.

  5. An Implentation Methodology for Integrated Resource Management in Urban Water Planning

    Science.gov (United States)

    Ebrahimi, G.; Thurm, B.; Klein, D. R.; Öberg, G.

    2014-12-01

    Urban water management requires innovative and integrative approaches to improve sustainability in cities keeping in touch with science progress. Integrated Resource Management (IRM) is one of these strategies and has been developed to integrate various natural and human resources. However, it is becoming increasingly clear that it is challenging to move from vision to implementation. The aim of this paper is to identify strengths and weaknesses of IRM and analyze if the approach might facilitate implementation of sustainability objectives in the water management field. A literature review was performed on peer-reviewed papers that were identified through Google Scholar search for the term 'Integrated Resource Management'. It was found that IRM has been used in a number of contexts such as urban planning, forestry, and management of waste and livestock. Significant implementation challenges are highlighted in the literature. Based on the lessons learned in many different fields, from forestry to communication sciences, important characteristics of IRM approach were found such as the need for adequate governance and strong leaderships, stakeholder's involvement, the learning process and the critical need of appropriate evaluation criteria. We conclude developing an implementation methodology and presenting several recommendations to implement IRM in urban management. While Integrated Water Resource Management (IWRM) is recognized as a fruitful approach to achieve sustainable water management, this study suggests that a shift toward Integrated Resource Management (IRM) can be beneficial as it is designed to facilitate consideration of the interrelationships between various natural and human resources.

  6. Project Management Data Retrieval and Integration (PMDRI) Application

    Data.gov (United States)

    Department of Veterans Affairs — The Project Management Data Retrieval and Integration Database (PMDRI) is a system that presents data from the VA Financial Management System(FMS) in a structured...

  7. Integrating Process Management with Archival Management Systems: Lessons Learned

    Directory of Open Access Journals (Sweden)

    J. Gordon Daines, III

    2009-03-01

    Full Text Available The Integrated Digital Special Collections (INDI system is a prototype of a database-driven, Web application designed to automate and manage archival workflow for large institutions and consortia. This article discusses the how the INDI project enabled the successful implementation of a process to manage large technology projects in the Harold B. Lee Library at Brigham Young University. It highlights how the scope of these technology projects is set and how the major deliverables for each project are defined. The article also talks about how the INDI system followed the process and still failed to be completed. It examines why the process itself is successful and why the INDI project failed. It further underscores the importance of process management in archival management systems.

  8. Economic Exposure and Integrated Risk Management

    OpenAIRE

    Miller, Kent D.

    1994-01-01

    Most corporate risk management research focuses on particular risk exposures to the exclusion of other interrelated exposures. By contrast, this study models corporate risk exposures using a multivariate approach integrating the distinct exposures of interest to finance and strategy researchers. The paper addresses the implications of multivariate modeling for corporate risk management, some key methodological issues arising in empirical estimation of corporate economic exposrues, and direc...

  9. The Management of Law Firms Using Business Process Management, Document Management and Web Services Integration

    OpenAIRE

    Roxana Maria Petculet

    2012-01-01

    The aim of this paper is to present the technical solution implemented in the present context for the management of law firms. The informational system consists of the automation of business processes using a BPM engine and electronic archiving using a DMS. The communication between the two modules is made by invoking web services. The whole system integrates modules like: project management, contract management, invoice management, collection, CRM, reporting.

  10. Integrated economic management. Principal aspects and future

    International Nuclear Information System (INIS)

    2004-01-01

    Now that five years have passed (1999-2003) since the Owner Companies decided to merge the Asco and Vandellos-II nuclear power plants, we believe that, for Integrated Management through a single AIE, it is timely and advisable to describe the key issues of the process implemented to optimize economic results, always in accordance with the Policies of Nuclear Safety, Quality and Environment, Prevention, Human Factors and Availability, and we emphasize the following as essential elements: The Corporate Model; strategic/Operating Plans; integrated Economic Management Model SIE; Rationalization of the organizational structure, Continuous Training; Analysis of Processes and Procedures. (Author)

  11. An integration architecture for knowledge management system and business process management system

    NARCIS (Netherlands)

    Jung, J.; Choi, I.; Song, M.S.

    2007-01-01

    Recently, interests in the notion of process-oriented knowledge management (PKM) from academia and industry have been significantly increased. Comprehensive research and development requirements along with a cogent framework, however, have not been proposed for integrating knowledge management (KM)

  12. SELECTED REQUIREMENTS OF INTEGRATED MANAGEMENT SYSTEMS BASED ON PAS 99 SPECIFICATION

    Directory of Open Access Journals (Sweden)

    Paweł Nowicki

    2013-03-01

    Full Text Available The aim this research was to analyze the ways of integration of management systems in food sector. The study involved the documentation, audits, corrective and preventive actions and management's review phases described in the specification PAS 99, which is one of common elements of integrated management systems. Four organizations were selected for the study. The organizations had introduced and certified at least two standardized management systems. It was assumed that the investigated organizations should have implemented the HACCP system. Studies were conducted as a case study. The employees responsible for the functioning of management systems were interviewed in all four organizations. The study was conducted in the form of in-depth interviews based on pre-prepared script. The scenario was developed based on the PAS 99 guideline. The process of integration of management systems implemented in the studied companies reveals the full compliance of an integrated management system with PASS 99 in the policy area.

  13. Impacts of model initialization on an integrated surface water - groundwater model

    KAUST Repository

    Ajami, Hoori; McCabe, Matthew; Evans, Jason P.

    2015-01-01

    Integrated hydrologic models characterize catchment responses by coupling the subsurface flow with land surface processes. One of the major areas of uncertainty in such models is the specification of the initial condition and its influence

  14. Law for the Integral Management of Waste No. 8839

    International Nuclear Information System (INIS)

    2010-01-01

    The Law for Integral Waste Management No. 8839 was enacted in Costa Rica in 2010. The purpose of this law has been to regulate the integral management of residues and the efficient use of the resources, through the planning and execution of regulatory actions, operational, financial, administrative, educational, environmental and healthy of monitoring and evaluation [es

  15. Aquaculture research and management in the telecoupled Belt and Road Initiative countries and beyond

    Science.gov (United States)

    Yang, W.; Ying, Z.; Marín, T.

    2017-12-01

    Due to the continuous growth in aquatic product consumption, globally the total production of aquatic products has increased by 20% in the past two decades. In 2014, for the first time, the production of aquatic products for direct human consumption from aquaculture surpassed that of wild catch. In 2016, the total production of global aquatic products reached 170 million tons, of which 45% comes from the aquaculture sector. More importantly, over 80% of the global aquaculture production occurs in the Belt and Road Initiative countries. Particularly, China alone contributes to two third of the global share. The rapid expansion and intensification of aquaculture have many environmental and socioeconomic impacts both at the cultivation places and also in places where feed is produced; however, these telecoupled processes and effects are largely unknown in a quantitative manner. Here, we apply the telecoupling framework to analyze the aquaculture trade among China and other Belt and Road Initiative countries and beyond. The integrated telecoupling framework helps to demonstrate the environmental and socioeconomic interactions among the feed (and aquatic product) sending, receiving, and spillover systems. It also provides a platform to model the telecoupled processes and effects across multiple remotely connected systems. Moreover, the application of the framework reveals many research gaps and management needs on aquaculture research and management.

  16. Integrated Constructed Wetlands (ICW) for livestock wastewater management.

    Science.gov (United States)

    Harrington, Rory; McInnes, Robert

    2009-11-01

    Social, economic and environmental coherence is sought in the management of livestock wastewater. Wetlands facilitate the biogeochemical processes that exploit livestock wastewater and provide opportunities to achieve such coherence and also to deliver on a range of ecosystem services. The Integrated Constructed Wetland (ICW) concept integrates three inextricably linked objectives: water quantity and quality management, landscape-fit to improve aesthetic site values and enhanced biodiversity. The synergies derived from this explicit integration allow one of the key challenges for livestock management to be addressed. An example utilizing twelve ICW systems from a catchment on the south coast of Ireland demonstrates that over an eight year period mean reduction of total and soluble phosphorus (molybdate reactive phosphorus) exceeded 95% and the mean removal of ammonium-N exceeded 98%. This paper reviews evidence regarding the capacity of ICWs to provide a coherent and sustainable alternative to conventional systems.

  17. Auditing supports the integration of management systems in the nuclear industry

    International Nuclear Information System (INIS)

    Beckmerhagen, I.A.; Berg, H.P.; Karapetrovic, S.V.; Willborn, W.O.

    2004-01-01

    Integration of function-specific management systems in organizations is rapidly becoming a topic of interest for managers and auditors alike. This is mainly due to the proliferation of management system standards that foster compliance with the stated criteria for quality, environmental, occupational health and safety, social responsibility and other function-specific aspects of performance. While most of the available literature on this topic focuses on the integration of standards, there is comparatively little information available on how to actually build an integrated system internally. This paper hypothesizes that, besides using audits for the implementation of the available procedures, audits can provide an excellent basis for these integration efforts. Therefore the prerequisites, strategies and resources necessary for an effective audit in support of integrated management systems are discussed. The paper also describes how audits are used to improve a combined quality and safety management system at the repository of radioactive waste in Morsleben (Germany). (authors)

  18. How do primary health care teams learn to integrate intimate partner violence (IPV) management? A realist evaluation protocol.

    Science.gov (United States)

    Goicolea, Isabel; Vives-Cases, Carmen; San Sebastian, Miguel; Marchal, Bruno; Kegels, Guy; Hurtig, Anna-Karin

    2013-03-23

    Despite the existence of ample literature dealing, on the one hand, with the integration of innovations within health systems and team learning, and, on the other hand, with different aspects of the detection and management of intimate partner violence (IPV) within healthcare facilities, research that explores how health innovations that go beyond biomedical issues-such as IPV management-get integrated into health systems, and that focuses on healthcare teams' learning processes is, to the best of our knowledge, very scarce if not absent. This realist evaluation protocol aims to ascertain: why, how, and under what circumstances primary healthcare teams engage (if at all) in a learning process to integrate IPV management in their practices; and why, how, and under what circumstances team learning processes lead to the development of organizational culture and values regarding IPV management, and the delivery of IPV management services. This study will be conducted in Spain using a multiple-case study design. Data will be collected from selected cases (primary healthcare teams) through different methods: individual and group interviews, routinely collected statistical data, documentary review, and observation. Cases will be purposively selected in order to enable testing the initial middle-range theory (MRT). After in-depth exploration of a limited number of cases, additional cases will be chosen for their ability to contribute to refining the emerging MRT to explain how primary healthcare learn to integrate intimate partner violence management. Evaluations of health sector responses to IPV are scarce, and even fewer focus on why, how, and when the healthcare services integrate IPV management. There is a consensus that healthcare professionals and healthcare teams play a key role in this integration, and that training is important in order to realize changes. However, little is known about team learning of IPV management, both in terms of how to trigger such learning

  19. Environmental management initiatives and stakeholder influences

    DEFF Research Database (Denmark)

    Madsen, Henning; Ulhøi, John Parm

    1999-01-01

    in Danish industrial companies. These findings are discussed in the light of similar reported results and case studies of companies which are reportedly pioneers in the introduction of environmental initiatives from a number of EU countries. Implications for theory, practice and training are addressed...... of change, from the point of view of stakeholder theory, from a merely reactive attitude in industry, where companies only tend to respond to stakeholder pressure which cannot be ignored (e.g. ex post responses to one or two stakeholders, such as regulators and customers), towards an increasingly proactive...... attitude characterised by ex ante responses to several strategic groups of stakeholders (including NGOs, employees, neighbours, etc.). The present situation is illustrated by the findings in two recent surveys concerning perceived stakeholder influence in relation to environmental management initiatives...

  20. Integrating Sustainable Development into Operations Management Courses

    Science.gov (United States)

    Fredriksson, Peter; Persson, Magnus

    2011-01-01

    Purpose: It is widely acknowledged that aspects of sustainable development (SD) should be integrated into higher level operations management (OM) education. The aim of the paper is to outline the experiences gained at Chalmers University of Technology in Sweden from integrating aspects of SD into OM courses. Design/methodology/approach: The paper…

  1. Energy efficiency through integrated environmental management.

    Science.gov (United States)

    Benromdhane, Souad Ahmed

    2015-05-01

    Integrated environmental management became an economic necessity after industrial development proved to be unsustainable without consideration of environmental direct and indirect impacts. Energy dependency and air pollution along with climate change grew into major challenges facing developed and developing countries alike. Thus, a new global market structure emerged and changed the way we do trade. The search intensified for alternatives to petroleum. However, scientists, policy makers, and environmental activists agreed to focus on strategic conservation and optimization of energy use. Environmental concerns will remain partially unaddressed with the current pace of consumption because greenhouse gas emissions will continue to rise with economic growth. This paper discusses energy efficiency, steady integration of alternative sources, and increased use of best available technologies. Energy criteria developed for environmental labeling certification are presented. Our intention is to encourage manufacturers and service providers to supply consumers with less polluting and energy-consuming goods and services, inform consumers of the environmental and energy impacts, and thereby instill sustainable and responsible consumption. As several programs were initiated in developed countries, environmental labeling requirements created barriers to many exports manufactured in developing countries, affecting current world trade and putting more pressure on countries to meet those requirements. Defining an institutional and legal framework of environmental labeling is a key challenge in implementing such programs for critical economic sectors like tourism, textiles, and food production where energy needs are the most important aspect to control. A case study of Tunisia and its experience with eco-labeling is presented.

  2. One carbon cycle: Impacts of model integration, ecosystem process detail, model resolution, and initialization data, on projections of future climate mitigation strategies

    Science.gov (United States)

    Fisk, J.; Hurtt, G. C.; le page, Y.; Patel, P. L.; Chini, L. P.; Sahajpal, R.; Dubayah, R.; Thomson, A. M.; Edmonds, J.; Janetos, A. C.

    2013-12-01

    Integrated assessment models (IAMs) simulate the interactions between human and natural systems at a global scale, representing a broad suite of phenomena across the global economy, energy system, land-use, and carbon cycling. Most proposed climate mitigation strategies rely on maintaining or enhancing the terrestrial carbon sink as a substantial contribution to restrain the concentration of greenhouse gases in the atmosphere, however most IAMs rely on simplified regional representations of terrestrial carbon dynamics. Our research aims to reduce uncertainties associated with forest modeling within integrated assessments, and to quantify the impacts of climate change on forest growth and productivity for integrated assessments of terrestrial carbon management. We developed the new Integrated Ecosystem Demography (iED) to increase terrestrial ecosystem process detail, resolution, and the utilization of remote sensing in integrated assessments. iED brings together state-of-the-art models of human society (GCAM), spatial land-use patterns (GLM) and terrestrial ecosystems (ED) in a fully coupled framework. The major innovative feature of iED is a consistent, process-based representation of ecosystem dynamics and carbon cycle throughout the human, terrestrial, land-use, and atmospheric components. One of the most challenging aspects of ecosystem modeling is to provide accurate initialization of land surface conditions to reflect non-equilibrium conditions, i.e., the actual successional state of the forest. As all plants in ED have an explicit height, it is one of the few ecosystem models that can be initialized directly with vegetation height data. Previous work has demonstrated that ecosystem model resolution and initialization data quality have a large effect on flux predictions at continental scales. Here we use a factorial modeling experiment to quantify the impacts of model integration, process detail, model resolution, and initialization data on projections of

  3. Best in Class Project Management and Contract Management Initiative at the Department of Energy's Office of Environmental Management

    International Nuclear Information System (INIS)

    Van Camp, S.G.; Stevenson, J.S.; Deiters, M.G.

    2009-01-01

    Since its founding in 1989, the U.S. Department of Energy (DOE), Office of Environmental Management (EM) has struggled with a legacy of inadequate project and contract management. This has been manifested in recurring scope changes, cost overruns and schedule delays, and has been documented in multiple internal and external reviews. To address this issue, EM has developed a vision for building a 'Best in Class' Project Management and Contract Management (BICPM) organization. To develop the strategy and implement the process to accomplish this vision, EM contracted with the U.S. Army Corps of Engineers (USACE) and their support contractors. EM and the USACE Team developed a five-phased approach to implement the BICPM Initiative: (I) develop assessment criteria, (II) assess existing project and contract management capabilities, (III) develop an implementation plan, (IV) implement corrective actions, and (V) institutionalize BICPM. Under Phases I and II, the USACE Team assessed the status of project and contract management capabilities at 16 EM offices. These assessments evaluated strengths and weaknesses in 12 key project management capabilities and benchmarks and three contract management benchmarks. Under Phase III, EM and the USACE Team developed the Corporate Implementation Plan which identified the key challenges and provided a road-map to address these challenges and to implement BICPM. These challenges included: Federal staffing shortages; integration of project and contract management; further development of project-oriented culture; project baseline maintenance; consistent implementation of the DOE order for project management, 413.3A; and role of EM Headquarters in BICPM. The shortage of qualified resources dedicated to supporting Federal project and contract management functions was identified as a primary cause for project and contract management difficulties within EM. The Corporate Implementation Plan outlined a set of 18 specific Recommended Priority

  4. Space station operations task force. Panel 4 report: Management integration

    Science.gov (United States)

    1987-01-01

    The Management Integration Panel of the Space Station Operations Task Force was chartered to provide a structure and ground rules for integrating the efforts of the other three panels and to address a number of cross cutting issues that affect all areas of space station operations. Issues addressed include operations concept implementation, alternatives development and integration process, strategic policy issues and options, and program management emphasis areas.

  5. The nexus between integrated natural resources management and integrated water resources management in southern Africa

    Science.gov (United States)

    Twomlow, Stephen; Love, David; Walker, Sue

    The low productivity of smallholder farming systems and enterprises in the drier areas of the developing world can be attributed mainly to the limited resources of farming households and the application of inappropriate skills and practices that can lead to the degradation of the natural resource base. This lack of development, particularly in southern Africa, is of growing concern from both an agricultural and environmental perspective. To address this lack of progress, two development paradigms that improve land and water productivity have evolved, somewhat independently, from different scientific constituencies. One championed by the International Agricultural Research constituency is Integrated Natural Resource Management (INRM), whilst the second championed predominantly by Environmental and Civil Engineering constituencies is Integrated Water Resources Management (IWRM). As a result of similar objectives of working towards the millennium development goals of improved food security and environmental sustainability, there exists a nexus between the constituencies of the two paradigms, particularly in terms of appreciating the lessons learned. In this paper lessons are drawn from past INRM research that may have particular relevance to IWRM scientists as they re-direct their focus from blue water issues to green water issues, and vice-versa. Case studies are drawn from the management of water quality for irrigation, green water productivity and a convergence of INRM and IWRM in the management of gold panning in southern Zimbabwe. One point that is abundantly clear from both constituencies is that ‘one-size-fits-all’ or silver bullet solutions that are generally applicable for the enhancement of blue water management/formal irrigation simply do not exist for the smallholder rainfed systems.

  6. Integrated Data for Improved Asset Management

    Science.gov (United States)

    2016-05-26

    The objective of this research is to demonstrate the potential benefits for agency-wide data integration for VDOT asset management. This objective is achieved through an example application that requires information distributed across multiple databa...

  7. Integrated Climate Smart Flood Management for Accra, Ghana ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Home · What we do ... The research team will use evidence to develop an integrated climate smart flood management framework to support policymaking. ... The Ministry of Environment, Science, Technology, and Innovation will manage the ...

  8. Integrated groundwater management: An overview of concepts and challenges

    Science.gov (United States)

    Jakeman, Anthony J.; Barreteau, Olivier; Hunt, Randall J.; Rinaudo, Jean-Daniel; Ross, Andrew; Jakeman, Anthony J.; Barreteau, Olivier; Hunt, Randall J.; Rinaudo, Jean-Daniel; Ross, Andrew

    2016-01-01

    Managing water is a grand challenge problem and has become one of humanity’s foremost priorities. Surface water resources are typically societally managed and relatively well understood; groundwater resources, however, are often hidden and more difficult to conceptualize. Replenishment rates of groundwater cannot match past and current rates of depletion in many parts of the world. In addition, declining quality of the remaining groundwater commonly cannot support all agricultural, industrial and urban demands and ecosystem functioning, especially in the developed world. In the developing world, it can fail to even meet essential human needs. The issue is: how do we manage this crucial resource in an acceptable way, one that considers the sustainability of the resource for future generations and the socioeconomic and environmental impacts? In many cases this means restoring aquifers of concern to some sustainable equilibrium over a negotiated period of time, and seeking opportunities for better managing groundwater conjunctively with surface water and other resource uses. However, there are many, often-interrelated, dimensions to managing groundwater effectively. Effective groundwater management is underpinned by sound science (biophysical and social) that actively engages the wider community and relevant stakeholders in the decision making process. Generally, an integrated approach will mean “thinking beyond the aquifer”, a view which considers the wider context of surface water links, catchment management and cross-sectoral issues with economics, energy, climate, agriculture and the environment. The aim of the book is to document for the first time the dimensions and requirements of sound integrated groundwater management (IGM). The primary focus is on groundwater management within its system, but integrates linkages beyond the aquifer. The book provides an encompassing synthesis for researchers, practitioners and water resource managers on the concepts and

  9. Management initiatives in a community-based health insurance scheme.

    Science.gov (United States)

    Sinha, Tara; Ranson, M Kent; Chatterjee, Mirai; Mills, Anne

    2007-01-01

    Community-based health insurance (CBHI) schemes have developed in response to inadequacies of alternate systems for protecting the poor against health care expenditures. Some of these schemes have arisen within community-based organizations (CBOs), which have strong links with poor communities, and are therefore well situated to offer CBHI. However, the managerial capacities of many such CBOs are limited. This paper describes management initiatives undertaken in a CBHI scheme in India, in the course of an action-research project. The existing structures and systems at the CBHI had several strengths, but fell short on some counts, which became apparent in the course of planning for two interventions under the research project. Management initiatives were introduced that addressed four features of the CBHI, viz. human resources, organizational structure, implementation systems, and data management. Trained personnel were hired and given clear roles and responsibilities. Lines of reporting and accountability were spelt out, and supportive supervision was provided to team members. The data resources of the organization were strengthened for greater utilization of this information. While the changes that were introduced took some time to be accepted by team members, the commitment of the CBHI's leadership to these initiatives was critical to their success. Copyright (c) 2007 John Wiley & Sons, Ltd.

  10. Ergonomics Integration Omproving Production Process Management in Enterprises of Latvia

    OpenAIRE

    Henrijs Kaļķis

    2013-01-01

    Dotoral thesis ERGONOMICS INTEGRATION IMPROVING PRODUCTION PROCESS MANAGEMENT IN ENTERPRISES OF LATVIA ANNOTATION Ergonomics integration in process management has great significance in organisations` growth of productivity. It is a new approach to entrepreneurship and business strategy, where ergonomic aspects and values are taken into account in ensuring the effective process management and profitability of enterprises. This study is aimed at solution of the problem of e...

  11. The Integrated Mode Management Interface

    Science.gov (United States)

    Hutchins, Edwin

    1996-01-01

    Mode management is the processes of understanding the character and consequences of autoflight modes, planning and selecting the engagement, disengagement and transitions between modes, and anticipating automatic mode transitions made by the autoflight system itself. The state of the art is represented by the latest designs produced by each of the major airframe manufacturers, the Boeing 747-400, the Boeing 777, the McDonnell Douglas MD-11, and the Airbus A320/A340 family of airplanes. In these airplanes autoflight modes are selected by manipulating switches on the control panel. The state of the autoflight system is displayed on the flight mode annunciators. The integrated mode management interface (IMMI) is a graphical interface to autoflight mode management systems for aircraft equipped with flight management computer systems (FMCS). The interface consists of a vertical mode manager and a lateral mode manager. Autoflight modes are depicted by icons on a graphical display. Mode selection is accomplished by touching (or mousing) the appropriate icon. The IMMI provides flight crews with an integrated interface to autoflight systems for aircraft equipped with flight management computer systems (FMCS). The current version is modeled on the Boeing glass-cockpit airplanes (747-400, 757/767). It runs on the SGI Indigo workstation. A working prototype of this graphics-based crew interface to the autoflight mode management tasks of glass cockpit airplanes has been installed in the Advanced Concepts Flight Simulator of the CSSRF of NASA Ames Research Center. This IMMI replaces the devices in FMCS equipped airplanes currently known as mode control panel (Boeing), flight guidance control panel (McDonnell Douglas), and flight control unit (Airbus). It also augments the functions of the flight mode annunciators. All glass cockpit airplanes are sufficiently similar that the IMMI could be tailored to the mode management system of any modern cockpit. The IMMI does not replace the

  12. Integrating environment health and safety management at Petro-Canada

    International Nuclear Information System (INIS)

    Raymond, G.

    1993-01-01

    Petro-Canada has developed a tool to integrate, measure, and improve its management systems of environment, health, and safety (EH ampersand S). This tool, called the Total Loss Management System, is described in the areas of general management issues, policies and procedures, evaluations, organization, stewardship, issue management, and performance measures. Petro-Canada's policies on occupational health and safety are consistent with its environmental policy, being structured in the same way. An integrated audit system is used to cover health, safety, industrial hygiene, reliability, environment, and risk management. EH ampersand S matters are integrated at the corporate level in a separate department. Regional divisions review EH ampersand S performance every month, incidents are discussed, and preventive measures are taken as necessary. Regional performances are combined every quarter for ultimate presentation to the Petro-Canada board. New or emerging issues that may affect divisions are assigned an issue sponsor, a member of divisional management who makes sure the issue receives the resources necessary to study and define its impact. Examples of issues include soil contamination, process hazard management, and benzene exposure limits. Performance measures flow from the corporate environment and occupational health and safety policies, and come in two types: those that measure activities to improve performance and those that measure the outcome of the activities

  13. Integrated information and logistics management, quality management and firm performance of pork processing industry in China

    NARCIS (Netherlands)

    Han, J.; Trienekens, J.H.; Omta, S.W.F.

    2009-01-01

    Purpose – This paper seeks to discuss the interactions amongst integrated information technology (IT), integrated logistics management, quality management practices and firm performance of pork processors in China. Design/methodology/approach – A conceptual framework was developed by examining the

  14. 7 CFR 4290.360 - Initial review of Applicant's management team's qualifications.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Initial review of Applicant's management team's...'s management team's qualifications. The Secretary will review the information submitted by the Applicant concerning the qualifications of the Applicant's management team to determine in his or her sole...

  15. 40 CFR 63.11584 - What are my initial and continuous compliance management practice requirements?

    Science.gov (United States)

    2010-07-01

    ... compliance management practice requirements? 63.11584 Section 63.11584 Protection of Environment... What are my initial and continuous compliance management practice requirements? (a) For each new and... gr/dscf, the management practice requirements are as follows: (1) You must conduct an initial visual...

  16. Managing the IT Integration of Acquisitions by Multi-Business Organizations

    DEFF Research Database (Denmark)

    Henningsson, Stefan; Yetton, Philip

    2011-01-01

    Acquisitions are standard components of the growth strategies of many organizations. Frequently, acquisitions raise important questions concerning how and to what extent the acquisition’s information technology (IT) needs to be integrated into the IT of the acquirer. We investigate how the initial...... of IT integration paths in two acquisitions made by the industry group Trelleborg AB. We identify four initial business and IT strategic alignment conditions where the IT integration process is a simple one-step process exploiting existing business and IT capabilities. Low compliance with these conditions leads...

  17. Knowledge Sharing, Communities of Practice, and Learning Asset Integration - DAU's Major Initiatives

    National Research Council Canada - National Science Library

    Hickok, John

    2005-01-01

    .... What follows is an overview of Knowledge Sharing through the eyes of the Defense Acquisition University, along with some new initiatives called Learning Asset Integration and Workflow Learning...

  18. INTEGRATED SAFETY MANAGEMENT SYSTEM IN AIR TRAFFIC SERVICES

    Directory of Open Access Journals (Sweden)

    Volodymyr Kharchenko

    2014-06-01

    Full Text Available The article deals with the analysis of the researches conducted in the field of safety management systems.Safety management system framework, methods and tools for safety analysis in Air Traffic Control have been reviewed.Principles of development of Integrated safety management system in Air Traffic Services have been proposed.

  19. 49 CFR 195.452 - Pipeline integrity management in high consequence areas.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Pipeline integrity management in high consequence... Management § 195.452 Pipeline integrity management in high consequence areas. (a) Which pipelines are covered... that could affect a high consequence area, including any pipeline located in a high consequence area...

  20. Inclusive blue swimming crab fishery management initiative in Betahwalang Demak, Indonesia

    Science.gov (United States)

    Ghofar, A.; Redjeki, S.; Madduppa, H.; Abbey, M.; Tasunar, N.

    2018-02-01

    There has been a growing interest in the sustainability of the blue swimming crab (Portunus pelagicus, BSC) fisheries in Indonesia. The fishery is operated on a small-scale basis and yet it significantly contributes to the Indonesia’s fisheries as the third biggest export commodities following tuna and shrimp. The project inclusively (i) brings together coastal and fishing communities, university, the private sector, government at various levels and international agencies, (ii) bottom up approach is integrated with top-down (government policy) approach and (iii) integration o f conservation into fisheries management. This approach resulted in better understanding and participation among the coastal fishing communities on sustainable fisheries and the necessity to perform fisheries management. This led to the establishment of BSC fishery management body (legally support by Village Regulation - No.06/2013 on BSC fishery management in 2013, followed by a District Regulation No.523/0166/2014 on BSC fishery management in 2014. More recently, the Governor of Central Java issued a Governor Regulation No. 33/2017 on Crab and Lobster fisheries management and a Governor Decree No. 523/93/2017 on the establishment of the BSC fisheries management committee in Central Java. Further impacts have been raised awareness in sustainable BSC fishery management in surrounding districts in other provinces, namely East Java and Southeast Sulawesi. There remains, further needs to strengthen fishery governance by means of integrating national and local government effort in sustaining the fisheries, including the Issuance and effective implementation of the provincial decree on BSC fishery management for Central Java, that will enable the use of province’s resource to implement fisheries management and strengthen law enforcement. To help improve the stock, a plan for stock enhancement should also be developed with proper monitoring program and community commitment to avoid “put and

  1. Effects of top management involvement in integrated marketing communications

    Directory of Open Access Journals (Sweden)

    Nina Hočevar

    2007-12-01

    Full Text Available There is scarce empirical evidence in the academic literature of how top management involvement influences the degree of integrated marketing communications. At the same time, some authors believe that this relationship should be explored more extensively.In this paper we present one possible approach to investigating the relationship between top management involvement and the degree of integrated marketing communications. Our research established that a greater involvement of top management in marketing communications could be associated with a higher degree of IMC. Investigating the relationship between management and IMC is indeed at a very early stage. We suggest that this study has provided a basis for future research on the relationship between top management involvement in marketing communications and the degree of IMC.

  2. Integrated management system implementation strategy for PUSPATI TRIGA Reactor

    International Nuclear Information System (INIS)

    Phongsakorn Prak Tom; Shaharum Ramli; Mohamad Azman Che Mat Isa; Shahirah Abdul Rahman; Mohd Zaid Mohamed; Mat Zin Mat Husin; Nurfazila Husain; Mohamad Puad Abu

    2012-01-01

    Integrated Management System (IMS) designed to fulfil the requirements integrates safety, health, environmental, security, quality and economic elements. PUSPATI TRIGA Reactor (RTP) is currently implementing the Quality Assurance Program (QAP) and looking toward implementation of IMS. This paper discussed the implementation strategy of IMS for RTP. There are nine steps of IMS implementation strategy. In implementation of IMS, Gantt chart is useful project management tool in managing the project frame work. IMS is intended as a tool to enable the continuous development of safety culture and achieve higher safety levels. (author)

  3. Integrated Services Management System (ISMS): A management and decision making tool

    Energy Technology Data Exchange (ETDEWEB)

    Barber, D.S.; Brockman, D.L.; Buxton, L.D. [and others

    1995-10-01

    This document provides information concerning the Integrated Services Management System (ISMS) that was developed for the Laboratories Services Division during the period February 1994 through May 1995. ISMS was developed as a formal method for centralized management of programs within the Division. With minor modifications, this system can be adapted for management of all overhead functions at SNL or for sector level program management. Included in this document are the reasons for the creation of this system as well as the resulting benefits. The ISMS consists of six interlinked processes; Issues Management, Task/Activity Planning, Work Decision, Commitment Management, Process/Project Management, and Performance Assessment. Those processes are described in detail within this document. Additionally, lessons learned and suggestions for future improvements are indicated.

  4. Which Triple Aim related measures are being used to evaluate population management initiatives? An international comparative analysis.

    Science.gov (United States)

    Hendrikx, Roy J P; Drewes, Hanneke W; Spreeuwenberg, Marieke; Ruwaard, Dirk; Struijs, Jeroen N; Baan, Caroline A

    2016-05-01

    Population management (PM) initiatives are introduced in order to create sustainable health care systems. These initiatives should focus on the continuum of health and well-being of a population by introducing interventions that integrate various services. To be successful they should pursue the Triple Aim, i.e. simultaneously improve population health and quality of care while reducing costs per capita. This study explores how PM initiatives measure the Triple Aim in practice. An exploratory search was combined with expert consultations to identify relevant PM initiatives. These were analyzed based on general characteristics, utilized measures and related selection criteria. In total 865 measures were used by 20 PM initiatives. All quality of care domains were included by at least 11 PM initiatives, while most domains of population health and costs were included by less than 7 PM initiatives. Although their goals showed substantial overlap, the measures applied showed few similarities between PM initiatives and were predominantly selected based on local priority areas and data availability. Most PM initiatives do not measure the full scope of the Triple Aim. Additionally, variety between measures limits comparability between PM initiatives. Consensus on the coverage of Triple Aim domains and a set of standardized measures could further both the inclusion of the various domains as well as the comparability between PM initiatives. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  5. Integrated Pest Management: A Curriculum for Early Care and Education Programs

    Science.gov (United States)

    California Childcare Health Program, 2011

    2011-01-01

    This "Integrated Pest Management Toolkit for Early Care and Education Programs" presents practical information about using integrated pest management (IPM) to prevent and manage pest problems in early care and education programs. This curriculum will help people in early care and education programs learn how to keep pests out of early…

  6. Design Integration of Facilities Management

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2009-01-01

    One of the problems in the building industry is a limited degree of learning from experiences of use and operation of existing buildings. Development of professional facilities management (FM) can be seen as the missing link to bridge the gap between building operation and building design....... Strategies, methods and barriers for the transfer and integration of operational knowledge into the design process are discussed. Multiple strategies are needed to improve the integration of FM in design. Building clients must take on a leading role in defining and setting up requirements and procedures...... on literature studies and case studies from the Nordic countries in Europe, including research reflections on experiences from a main case study, where the author, before becoming a university researcher, was engaged in the client organization as deputy project director with responsibility for the integration...

  7. IMPLEMENTATION OF INTEGRAL SYSTEM OF QUALITY MANAGEMENT IN TOURISM

    Directory of Open Access Journals (Sweden)

    Vidoje Vujic

    2007-12-01

    Full Text Available Theory and practice have corroborated the need and usefulness of an integral approach to quality management in tourist destinations, since the destination and its touristic offer define a number of disparate participants and interested parties. An integral system of quality management is one of the models of touristic management that with the implementation of contemporary principles strives to achieve business excellence and competitory advantage. The paper determines and projects the need and importance of implementing an integral system and accordingly seeks to form a model for its development. By studying the oneness of the whole we have established the dependence and firm connections between particular norms and elements, and by analyzing them in this paper we describe the structure and associated characteristics of the whole.

  8. Development and design of an integrated information management system for safe management of radioactive waste

    Energy Technology Data Exchange (ETDEWEB)

    Son, Dong Chan; Hong, Suk Young; An, Kyoung Il [Daesang Information Technology Co., Ltd., Seoul (Korea, Republic of)

    2004-05-15

    An integrated data management system for the safe management of radioactive waste and spent fuel in Korea is developed to collect basic information, provide the framework for national regulation, and improve national competition and efficiency in the management of radioactive waste and spent fuel. This system can also provide public access to information such as a statistical graphs and integrated data from various waste generators to meet increased public needs and interests. Objectives can be summarized as; the five principles (independence, openness, clearance, efficiency and reliance) of safety regulation can be realized. Public understanding and reliance on the safety of spent fuel and radioactive waste management can be promoted by providing reliable information. Ensure an openness within the international nuclear community and efficiently support international agreements among contracting parties by operating safe and efficient management of spent fuel and radioactive waste (IAEA joint convention on the safety of spent fuel management and on the safety of radioactive waste management). The system can compensate for the imperfections In safe regulation of radioactive waste and spent fuel management related to waste generation, storage and disposal, and make it possible to holistic control. Re-organize the basic framework of KINS's intermediate and long term research organization and trends, regarding waste management policy is to integrate safe management and unit safe disposal.

  9. Development and design of an integrated information management system for safe management of radioactive waste

    International Nuclear Information System (INIS)

    Son, Dong Chan; Hong, Suk Young; An, Kyoung Il

    2004-05-01

    An integrated data management system for the safe management of radioactive waste and spent fuel in Korea is developed to collect basic information, provide the framework for national regulation, and improve national competition and efficiency in the management of radioactive waste and spent fuel. This system can also provide public access to information such as a statistical graphs and integrated data from various waste generators to meet increased public needs and interests. Objectives can be summarized as; the five principles (independence, openness, clearance, efficiency and reliance) of safety regulation can be realized. Public understanding and reliance on the safety of spent fuel and radioactive waste management can be promoted by providing reliable information. Ensure an openness within the international nuclear community and efficiently support international agreements among contracting parties by operating safe and efficient management of spent fuel and radioactive waste (IAEA joint convention on the safety of spent fuel management and on the safety of radioactive waste management). The system can compensate for the imperfections In safe regulation of radioactive waste and spent fuel management related to waste generation, storage and disposal, and make it possible to holistic control. Re-organize the basic framework of KINS's intermediate and long term research organization and trends, regarding waste management policy is to integrate safe management and unit safe disposal

  10. Integrated design strategy for product life-cycle management

    Science.gov (United States)

    Johnson, G. Patrick

    2001-02-01

    Two major trends suggest new considerations for environmentally conscious manufacturing (ECM) -- the continuation of dematerialization and the growing trend toward goods becoming services. A diversity of existing research could be integrated around those trends in ways that can enhance ECM. Major research-based achievements in information, computation, and communications systems, sophisticated and inexpensive sensing capabilities, highly automated and precise manufacturing technologies, and new materials continue to drive the phenomenon of dematerialization - the reduction of the material and energy content of per capita GDP. Knowledge is also growing about the sociology, economics, mathematics, management and organization of complex socio-economic systems. And that has driven a trend towards goods evolving into services. But even with these significant trends, the value of material, energy, information and human resources incorporated into the manufacture, use and disposal of modern products and services often far exceeds the benefits realized. Multi-disciplinary research integrating these drivers with advances in ECM concepts could be the basis for a new strategy of production. It is argued that a strategy of integrating information resources with physical and human resources over product life cycles, together with considering products as streams of service over time, could lead to significant economic payoff. That strategy leads to an overall design concept to minimize costs of all resources over the product life cycle to more fully capture benefits of all resources incorporated into modern products. It is possible by including life cycle monitoring, periodic component replacement, re-manufacture, salvage and human factor skill enhancement into initial design.

  11. Integrated pest management - an overview and update

    Science.gov (United States)

    Thomas D. Landis; R. Kasten Dumroese

    2014-01-01

    Integrated pest management, better known as IPM, is a familiar term for those of us working in forest, conservation, and native plant nurseries. An almost synonymous concept is "holistic pest management" that has been the topic of chapters in recent Agriculture Handbooks that would be useful to growers of native plants (see Landis and others 2009; Landis and...

  12. Corporate Motivation for Integrated Management System Implementation, Why do Firms Engage in Integration of Management Systems: A Literature Review & Research Agenda

    NARCIS (Netherlands)

    Asif, M.; Asif, M.; de Bruijn, E.J.; Fisscher, O.A.M.

    2008-01-01

    Integration of management systems such as for quality, environment, occupational health and safety, risk management, and corporate social responsibilities is a viable organisational approach to cost reduction, efficient utilization of resources, greater motivation of employees, and better compliance

  13. Integral system of management quality - company quality assurance

    International Nuclear Information System (INIS)

    Dimitrovski, Aleksandar

    1999-01-01

    Integral System of Management Quality is imposed as a solution which in the future will be applied in the companies more frequently, provoked from the needs for solving management quality, working conditions, ecology, safety at work, way of leaving, etc. (Original)

  14. INTEGRATED WATERSHED MANAGEMENT: PRINCIPLES AND PRACTICE. Book Review

    Science.gov (United States)

    Through a wide range of information and topics, Integrated Watershed Management Principles and Practice shows how involved the watershed management planning process can be. The book is informative, and the author obviously has researched the subject thoroughly. The book's case...

  15. Integrated nutrients management for 'desi' cotton

    International Nuclear Information System (INIS)

    Qazi, M.A.; Akram, M.; Ahmad, N.; Khattak, M.A.

    2007-01-01

    Intensive cropping with no return of crop residues and other organic inputs result in the loss of soil organic matter (SOM) and nutrient supply in (Desi) cotton-wheat cropping system in Pakistan. For appraisal of problem and finding solution to sustainability, we evaluated six treatments comprised of two fertilizer doses and three management techniques over a period of three years (2003-05) monitoring their effects on seed cotton yield and soil fertility. The techniques included chemical fertilizers, municipal solid waste manure (MSWM) integrated with chemical fertilizers in 1:4 ratios with, and without pesticides. The results revealed that cotton yields. Were enhanced by 19% due to site-specific fertilizer dose over conventional dose. Ignoring weeds control by means of herbicided application resulted in 5% decrease of seed cotton yield in IPNM technique positive effect of MSWM integration was noted on soil test phosphorus and SOM. Site-specific fertilizer application and integrated plant nutrient management by MSWM proved their suitability as the techniques not only improve soil quality in terms of sustained levels of organic matter and phosphorus but also provide a safe way of waste disposal. (author)

  16. Supply Chain Management and Sustainability: Procrastinating Integration in Mainstream Research

    Directory of Open Access Journals (Sweden)

    Marisa P. de Brito

    2010-03-01

    Full Text Available Research has pointed out opportunities and research agendas to integrate sustainability issues with supply chain and operations management. However, we find that it is still not mainstream practice to systematically take a sustainability approach in tackling supply chain and operations management issues. In this paper, we make use of behavioral theory to explain the current lack of integration. We conclude through abductive reasoning that the reasons for procrastinating integration of sustainability in supply chain and operations management research are the conflicting nature of the task and the inherent context, which is the focus on operations rather than environmental or social issues.

  17. The innovation and practice of management improved by integration management information system in nuclear enterprise

    International Nuclear Information System (INIS)

    Zhang Fan; Cheng Lihong; Li Qisheng; Ge Zhengfa

    2012-01-01

    This article expounds that Hunan Taohuajiang Nuclear Power Company generally programs the route of company's core business and implements its integration through referencing the experience of informationization construction of other enterprises at the beginning of the foundation of this company, and summarizes the experience of system construction and analyses the innovation and signification of the integrative management information system to the nu- clear power enterprise management from data unified, resources sharing and business electronic and the management improvement of this company. (authors)

  18. Integrated tracking, classification, and sensor management theory and applications

    CERN Document Server

    Krishnamurthy, Vikram; Vo, Ba-Ngu

    2012-01-01

    A unique guide to the state of the art of tracking, classification, and sensor management. This book addresses the tremendous progress made over the last few decades in algorithm development and mathematical analysis for filtering, multi-target multi-sensor tracking, sensor management and control, and target classification. It provides for the first time an integrated treatment of these advanced topics, complete with careful mathematical formulation, clear description of the theory, and real-world applications. Written by experts in the field, Integrated Tracking, Classification, and Sensor Management provides readers with easy access to key Bayesian modeling and filtering methods, multi-target tracking approaches, target classification procedures, and large scale sensor management problem-solving techniques.

  19. [Management, quality of health and occupational safety and hospital organization: is integration possible?].

    Science.gov (United States)

    Corrao, Carmela Romana Natalina

    2011-01-01

    The evolution of the national and European legislation has progressively transformed the working environments into organized environments. Specific models for its management are being proposed, which should be integrated into general management strategies. In the case of hospitals this integration should consider the peculiar organizational complexity, where the management of the occupational risk needs to be integrated with clinical risk management and economic risk management. Resources management should also consider that Occupational Medicine has not a direct monetary benefit for the organisation, but only indirect health consequences in terms of reduction of accidents and occupational diseases. The deep and simultaneous analysis of the current general management systems and the current management methods of occupational safety and health protection allows one to hyphotesise a possible integration between them. For both of them the Top Management is the main responsible of the quality management strategies and the use of specific documents in the managerial process, such as the document of risks evaluation in the occupational management and the quality manual in the general management, is of paramount importance. An integrated management has also the scope to pursue a particular kind of quality management, where ethics and job satisfaction are innovative, as established by recent European guidelines, management systems and national legislations.

  20. RISK MANAGEMENT: AN INTEGRATED APPROACH TO RISK MANAGEMENT AND ASSESSMENT

    Directory of Open Access Journals (Sweden)

    Szabo Alina

    2012-12-01

    Full Text Available Purpose: The objective of this paper is to offer an overview over risk management cycle by focusing on prioritization and treatment, in order to ensure an integrated approach to risk management and assessment, and establish the ‘top 8-12’ risks report within the organization. The interface with Internal Audit is ensured by the implementation of the scoring method to prioritize risks collected from previous generated risk report. Methodology/approach: Using evidence from other research in the area and the professional expertise, this article outlines an integrated approach to risk assessment and risk management reporting processes, by separating the risk in two main categories: strategic and operational risks. The focus is on risk prioritization and scoring; the final output will comprise a mix of strategic and operational (‘top 8-12’ risks, which should be used to establish the annual Internal Audit plan. Originality/value: By using an integrated approach to risk assessment and risk management will eliminate the need for a separate Internal Audit risk assessment over prevailing risks. It will reduce the level of risk assessment overlap by different functions (Tax, Treasury, Information System over the same risk categories as a single methodology, is used and will align timings of risk assessment exercises. The risk prioritization by usage of risk and control scoring criteria highlights the combination between financial and non-financial impact criteria allowing risks that do not naturally lend themselves to a financial amount to be also assessed consistently. It is emphasized the usage of score method to prioritize the risks included in the annual audit plan in order to increase accuracy and timelines.

  1. [Application of supply chain integration management of medical consumables].

    Science.gov (United States)

    Zhang, Jian

    2013-07-01

    This paper introduces the background, the content, the information management system of material supply chain integration management and the consumables management process. The system helps to expand the selection of hospital supplies varieties, to reduce consumables management costs, to improve the efficiency of supplies, to ensure supplies safety, reliability and traceability.

  2. RELAP-7 and PRONGHORN Initial Integration Plan

    Energy Technology Data Exchange (ETDEWEB)

    J. Ortensi; D. Andrs; A.A. Bingham; R.C. Martineau; J.W. Peterson

    2012-05-01

    Modern nuclear reactor safety codes require the ability to solve detailed coupled neutronicthermal fluids problems. For larger cores, this implies fully coupled 3-D spatial dynamics with appropriate feedback models that can provide enough resolution to accurately compute core heat generation and removal during steady and unsteady conditions. The reactor analyis code PRONGHORN is being coupled to RELAP-7 as a first step to extend RELAP's current capabilities. This report details the mathematical models, the type of coupling, and the testing that will be used to produce an integrated system. RELAP-7 is a MOOSE-based application that solves the continuity, momentum, and energy equations in 1-D for a compressible fluid. The pipe and joint capabilities enable it to model parts of the PCU system. The PRONGHORN application, also developed on the MOOSE infrastructure, solves the coupled equations that define the neutron diffusion, fluid flow, and heat transfer in a 3-D core model. Initially, the two systems will be loosely coupled to simplify the transition towards a more complex infrastructure. The integration will be tested with the OECD/NEA MHTGR-350 Coupled Neutronics-Thermal Fluids benchmark model.

  3. Integrated Guidelines for Management of Alloy 600 Locations

    Energy Technology Data Exchange (ETDEWEB)

    Na, Kyung-Hwan; Chung, Hansub; Yang, Jun-Seog; Lee, Kyoung-Soo [KHNP-Central Research Institute, Daejeon (Korea, Republic of)

    2015-05-15

    The locations experiencing PWSCC include steam generator tubes, pressurizer instrumental nozzles, control rod driving mechanism(CRDM) penetration nozzles, reactor outlet nozzles, and bottom mounted instrumental(BMI) nozzles. Korea Hydro and Nuclear Power Co.(KHNP) has developed integrated guidelines for management of alloy 600 locations and the guidelines are under review by the regulator. The guidelines consist of alloy 600 location database, inspection program, maintenance/preventive maintenance method, and finally water chemistry management for PWSCC mitigation. In this paper, the detailed contents are presented. The integrated guidelines collected all relevant information on the management of alloy 600 locations. This information may be useful for establishing the most effective preventive maintenance strategies by prioritization in addition to maintenance strategies. Table II summarize maintenance strategies for alloy 600 locations.

  4. Adoption of an integrated radiology reading room within a urologic oncology clinic: initial experience in facilitating clinician consultations.

    Science.gov (United States)

    Rosenkrantz, Andrew B; Lepor, Herbert; Taneja, Samir S; Recht, Michael P

    2014-05-01

    The authors describe their initial experience in implementing an integrated radiology reading room within a urologic oncology clinic, including the frequency and nature of clinician consultations and the perceived impact on patient management by clinicians. A radiology reading room was established within an office-based urologic oncology clinic in proximity to the surgeon's work area. A radiologist was present in this reading room for a 3-hour shift each day. The frequency and nature of consultations during these shifts were recorded. Also, the clinic's staff completed a survey assessing perceptions of the impact of the integrated reading room on patient management. One hundred two consultations occurred during 57 included dates (average, 1.8 consultations per shift): 52% for review of external cases brought in by patients on discs, 43% for review of internal cases, and 5% for direct review by the radiologist of imaging with patients. The maximum number of consultations during a single shift was 8. All of the clinic's urologists indicated that >90% of consultations benefited patient care. The clinicians indicated tendencies to view consultations as affecting management in the majority of cases, to be more likely to seek consultation for outside imaging when the radiologist was on site, and to be less likely to repeat outside imaging when the radiologist was on site. The integrated reading room within the clinic has potential to improve the quality of care, for instance by facilitating increased review of outside imaging studies and thereby potentially reducing duplicate ordering and by enabling occasional direct image review with patients by radiologists. Copyright © 2014 American College of Radiology. Published by Elsevier Inc. All rights reserved.

  5. Assessment of available integration algorithms for initial value ordinary differential equations

    International Nuclear Information System (INIS)

    Carver, M.B.; Stewart, D.G.

    1979-11-01

    There exists an extremely large number of algorithms designed for the ordinary differential equation initial value problem. The integration is normally done by a finite sum at time intervals which are chosen dynamically to satisfy an imposed error tolerance. This report describes the basic logistics of the integration process, identifies common areas of difficulty, and establishes a comprehensive test profile for integration algorithms. A number of algorithms are described, and selected published subroutines are evaluated using the test profile. It concludes that an effective library for general use need have only two such routines. The two selected are versions of the well-known Gear and Runge-Kutta-Fehlberg algorithms. Full documentation and listings are included. (auth)

  6. The 5C model: A new approach to asset integrity management

    International Nuclear Information System (INIS)

    Rahim, Yousif; Refsdal, Ingbjorn; Kenett, Ron S.

    2010-01-01

    As organizations grow more complex in operation and more global in scope, assets and technical integrity become key success factors. A company's asset integrity business process needs to be mapped in order to 1) provide a proper overview of operation and business processes, 2) identify all critical interfaces and 3) ensure that all gaps and overlaps in processes are eliminated. Achieving asset integrity requires companies to sustain their activities and identify the hazards, weaknesses and objectives of their strategic assets. Technical integrity emphasizes a complete overview of technical conditions and related information, and the ability of the companies to document the technical state of its assets. It is based on an integrated view of the current state of operations, and the identification of all critical interfaces, in order to ensure that all gaps and unnecessary overlaps in processes are eliminated. Companies look increasingly at their asset integrity management system as a means to extend the life of their assets, beyond the original design conditions and production capacity. Establishing an asset integrity management system requires the documentation of the company's technical integrity management, a strategy and the processes for carrying it out, identifying gaps; selecting corrective interventions and conducting follow up actions. The paper discusses various aspects of asset integrity management, including its planning and implementation. We begin with an introduction to asset technical integrity, provide some theoretical backgrounds, present a model we call 5C and conclude with a summary and discussion.

  7. Integrating Medical Supply as Part of the Army's Single Integrated Materiel Manager Concept--Why or why Not?

    National Research Council Canada - National Science Library

    Baxter, Shelia

    1998-01-01

    .... To achieve the goal of seamless logistics integration capabilities, one concept is to establish a Single Integrated Materiel Manager for the Army which envisions integrating all such functions...

  8. A Performance Management Initiative for Local Health Department Vector Control Programs.

    Science.gov (United States)

    Gerding, Justin; Kirshy, Micaela; Moran, John W; Bialek, Ron; Lamers, Vanessa; Sarisky, John

    2016-01-01

    Local health department (LHD) vector control programs have experienced reductions in funding and capacity. Acknowledging this situation and its potential effect on the ability to respond to vector-borne diseases, the U.S. Centers for Disease Control and Prevention and the Public Health Foundation partnered on a performance management initiative for LHD vector control programs. The initiative involved 14 programs that conducted a performance assessment using the Environmental Public Health Performance Standards. The programs, assisted by quality improvement (QI) experts, used the assessment results to prioritize improvement areas that were addressed with QI projects intended to increase effectiveness and efficiency in the delivery of services such as responding to mosquito complaints and educating the public about vector-borne disease prevention. This article describes the initiative as a process LHD vector control programs may adapt to meet their performance management needs. This study also reviews aggregate performance assessment results and QI projects, which may reveal common aspects of LHD vector control program performance and priority improvement areas. LHD vector control programs interested in performance assessment and improvement may benefit from engaging in an approach similar to this performance management initiative.

  9. Integrated online energy and battery life management for hybrid long haulage truck

    NARCIS (Netherlands)

    Pham, H.T.; Kessels, J.T.B.A.; Bosch, van den P.P.J.; Huisman, R.G.M.

    2014-01-01

    Battery lifetime management plays an important role for successful commercializing hybrid electric vehicles. This paper aims at integrating the battery lifetime management into the energy management system of a heavy-duty hybrid electric truck. The developed strategy called Integrated Energy

  10. Structural Integrity Management for Fixed Offshore Platforms in Malaysia

    OpenAIRE

    Narayanan Sambu Potty; Mohammad Kabir B. Mohd Akram

    2009-01-01

    Structural Integrity Management (SIM) is important for the protection of offshore crew, environment, business assets and company and industry reputation. API RP 2A contained guidelines for assessment of existing platforms mostly for the Gulf of Mexico (GOM). ISO 19902 SIM framework also does not specifically cater for Malaysia. There are about 200 platforms in Malaysia with 90 exceeding their design life. The Petronas Carigali Sdn Bhd (PCSB) uses the Asset Integrity Management ...

  11. Integrating the traditional and the modern conflict management ...

    African Journals Online (AJOL)

    The study examines the modalities for integrating traditional and modern conflict management strategies in Nigeria using an analysis of relevant documents as well as Black's Social Control Theory and Thomas-Kilmann's Model of Conflict Management. The successful amalgamation of diverse groups has radically shifted ...

  12. An integrated information system to support supply chain management & performance in SMEs

    International Nuclear Information System (INIS)

    Dekeng; Budiarto, S.; Prabowo, M. Agung; Herawan, Tutut

    2017-01-01

    This study aims to examine the relation between the level of supply chain management (SCM) adoption and small & medium enterprises (SMEs) performance. SCM adoption level is expected to facilitate SMEs in improving their efficiency, thus they can obtain their competitive advantage. Design/methodology/approach: This study uses primary data in the form of questionnaires. This study only takes the SMEs engaged in commerce (retail) business in order to avoid bias in IT usage. The questionnaires are given to 88 SMEs owners whom responsible for the IT development in their companies. Findings: The result proves that SCM adoption significantly affects SMEs performance. The hypotheses testing is performed using one-way ANOVA, the result shows that there are significant differences between level initiation, diffusion, and integration with SMEs performance. Originality: This study explains the relation between supply chain management (SCM) adoption level and SMEs performance that has never been performed before.

  13. An integrated information system to support supply chain management & performance in SMEs

    Energy Technology Data Exchange (ETDEWEB)

    Dekeng; Budiarto, S.; Prabowo, M. Agung; Herawan, Tutut

    2017-07-01

    This study aims to examine the relation between the level of supply chain management (SCM) adoption and small & medium enterprises (SMEs) performance. SCM adoption level is expected to facilitate SMEs in improving their efficiency, thus they can obtain their competitive advantage. Design/methodology/approach: This study uses primary data in the form of questionnaires. This study only takes the SMEs engaged in commerce (retail) business in order to avoid bias in IT usage. The questionnaires are given to 88 SMEs owners whom responsible for the IT development in their companies. Findings: The result proves that SCM adoption significantly affects SMEs performance. The hypotheses testing is performed using one-way ANOVA, the result shows that there are significant differences between level initiation, diffusion, and integration with SMEs performance. Originality: This study explains the relation between supply chain management (SCM) adoption level and SMEs performance that has never been performed before.

  14. SYSTEMS FOR IMPROVEMENT OF BUSINESS INTEGRATED MANAGEMENT PROCESSES IN PORTS

    Directory of Open Access Journals (Sweden)

    Pavle Popovic

    2017-03-01

    Full Text Available Based on test results obtained so far, the objective relating to modern scientific methods and approaches has been defined with the intention to develop model which defines new management system integration model, by adopting necessary practical terms of real systems that most frequently circulate in maritime practice in the field of integrated management systems (IMS in terms of safety and security of vessels and ports. The subject of research is maritime, particularly port services, by way of defining internal and external advantages through adopting integrated management systems. The research will be conducted through theoretical and applied assessments of case study analyses using example of the Port of Kotor H.Co.

  15. RISK MANAGEMENT: AN INTEGRATED APPROACH TO RISK MANAGEMENT AND ASSESSMENT

    OpenAIRE

    Szabo Alina

    2012-01-01

    Purpose: The objective of this paper is to offer an overview over risk management cycle by focusing on prioritization and treatment, in order to ensure an integrated approach to risk management and assessment, and establish the ‘top 8-12’ risks report within the organization. The interface with Internal Audit is ensured by the implementation of the scoring method to prioritize risks collected from previous generated risk report. Methodology/approach: Using evidence from other research in ...

  16. Implementing Integrated Multicultural Instructional Design in Management Education

    Science.gov (United States)

    Schultz, Jennifer L.; Higbee, Jeanne L.

    2011-01-01

    This purpose of this paper is to summarize the principles of integrated multicultural instructional design (IMID; Higbee, Goff, & Schultz, in press; Higbee, Schultz, & Goff, 2010) and present specific strategies for incorporating IMID in management education. The primary goal of IMID is to promote the integration of multicultural content…

  17. Integrated Hydrographical Basin Management. Study Case - Crasna River Basin

    Science.gov (United States)

    Visescu, Mircea; Beilicci, Erika; Beilicci, Robert

    2017-10-01

    Hydrographical basins are important from hydrological, economic and ecological points of view. They receive and channel the runoff from rainfall and snowmelt which, when adequate managed, can provide fresh water necessary for water supply, irrigation, food industry, animal husbandry, hydrotechnical arrangements and recreation. Hydrographical basin planning and management follows the efficient use of available water resources in order to satisfy environmental, economic and social necessities and constraints. This can be facilitated by a decision support system that links hydrological, meteorological, engineering, water quality, agriculture, environmental, and other information in an integrated framework. In the last few decades different modelling tools for resolving problems regarding water quantity and quality were developed, respectively water resources management. Watershed models have been developed to the understanding of water cycle and pollution dynamics, and used to evaluate the impacts of hydrotechnical arrangements and land use management options on water quantity, quality, mitigation measures and possible global changes. Models have been used for planning monitoring network and to develop plans for intervention in case of hydrological disasters: floods, flash floods, drought and pollution. MIKE HYDRO Basin is a multi-purpose, map-centric decision support tool for integrated hydrographical basin analysis, planning and management. MIKE HYDRO Basin is designed for analyzing water sharing issues at international, national and local hydrographical basin level. MIKE HYDRO Basin uses a simplified mathematical representation of the hydrographical basin including the configuration of river and reservoir systems, catchment hydrology and existing and potential water user schemes with their various demands including a rigorous irrigation scheme module. This paper analyzes the importance and principles of integrated hydrographical basin management and develop a case

  18. Organizational learning in developing the integrated quality management

    Directory of Open Access Journals (Sweden)

    Juhani Anttila

    2018-04-01

    Full Text Available High quality is organizations’ competitive advantage. It is beneficial to base this on professional approach, and basic concepts and definitions with scientific foundation. The necessary main concepts consist of quality, quality management, quality improvement and quality assurance. Organizations' top management is responsible of the quality management decisions and implementations. The present practical situation is fragmented and the implementations are most often based on the instrumental means of the different methodological schools, which is confusing and detrimental to the understanding and usefulness of the concept of quality management. It is not beneficial to build a special system for quality management by only following the requirements of the general standard. This cannot ensure competitive business advantage. In this article, we present an alternative approach that is a natural practical way to realize quality management as the teleological solution, Quality Integration, in which the general and specific quality concepts, principles and methodology are embedded within the normal business management activities. Our Quality Integration is based on the thinking of organizational learning. Its framework covers both running the current business and improving the overall business performance. This model has been used as the thinking framework in practical organizational cases since 1990’s. As the business circumstances change constantly, the organization must be constantly ready to renew through both small and radical changes. This change also receives resistance, and the development takes place according to a multi-phase process towards the new integration and requires a proper recognition and decisions. Principles of the organizational learning can help organizations in a consistent way. Evaluation of the overall organizational performance is an important quality management practice and should take into account performance enablers

  19. A SURVEY ON INDIAN EXPERIENCE ON INTEGRATED MANAGEMENT STANDARDS (IMS

    Directory of Open Access Journals (Sweden)

    H. Khanna

    2009-09-01

    Full Text Available Adoption of management systems standards is a key issue in manufacturing industry in India. Following the global trend quality and environmental issues are gaining importance. However the number of ISO 14001 certified companies are much less in India as compared to ISO 9001. The integration of ISO 14001 with ISO 9001 may help companies to sustain competitive advantage and overcome disappointments with quality standards and in turn encourage companies to adopt good environmental practices. The aim of this research is to study the implementation of integrated management standards (IMS by the manufacturing organizations in India. The different aspects of integration and benefits of IMS implementation are analyzed. This r esearch is based on empirical study carried out in Indian manufacturing firms, involving the application of a questionnaire. This questionnaire was tested on 50 manufacturing companies in India. The study reveals that focus on stakeholders; top management commitment and training are critical success factors for implementation of IMS. The main benefits of integration are discussed. The small sample size is one of the major limitations of this study. The paper informs the managers in manufacturing organizations and practitioners of management system standards especially in developing countries about IMS and will enable them to adopt IMS in future so that those organizations may not implement multiple and overlapping MSS(Management System Standards.

  20. Integrated emergency management in KKG

    International Nuclear Information System (INIS)

    Kluegel, J.U.; Plank, H.

    2007-01-01

    The development and introduction of emergency measures in Switzerland was mainly characterized by the evaluation of international experience and by systematic analysis of beyond-design basis accidents within the framework of plant-specific probabilistic safety analyses. As early as in the mid-eighties, the Swiss regulatory authority demanded that measures be taken against severe accidents, and periodically added more detailed requirements, most recently in 2000 when the introduction of Severe Accident Management Guidelines (SMAG) was demanded for power operation as well as operation in the non-power mode. The SMAG were introduced at the Goesgen nuclear power station within a project in the period between 2003 and 2005. For this purpose, a concept of integrated emergency management was developed which is based on updates of the proven emergency manual. One important aspect of this integrative concept is the distinction between preventive and mitigating procedures by defining appropriate criteria. The findings made in the implementation phase of the project include the realization that the introduction of procedures dealing with severe accidents also requires the ability to develop new ways of thinking and acting in accident management. This implies the awareness that procedures covering severe accidents must be applied much more flexibly and in the light of the situation than regulations covering fault conditions. Also possibilities to simulate severe accidents were created within the project both for the development of procedures and for training plant operators and members of the emergency staff. (orig.)

  1. Co-Leadership – A Management Solution for Integrated Health and Social Care

    Directory of Open Access Journals (Sweden)

    Charlotte Klinga

    2016-05-01

    Full Text Available Introduction: Co-leadership has been identified as one approach to meet the managerial challenges of integrated services, but research on the topic is limited. In the present study, co-leadership, practised by pairs of managers – each manager representing one of the two principal organizations in integrated health and social care services – was explored. Aim: To investigate co-leadership in integrated health and social care, identify essential preconditions in fulfilling the management assignment, its operationalization and impact on provision of sustainable integration of health and social care. Method: Interviews with eight managers exercising co-leadership were analysed using directed content analysis. Respondent validation was conducted through additional interviews with the same managers. Results: Key contextual preconditions were an organization-wide model supporting co-leadership and co-location of services. Perception of the management role as a collective activity, continuous communication and lack of prestige were essential personal and interpersonal preconditions. In daily practice, office sharing, being able to give and take and support each other contributed to provision of sustainable integration of health and social care.  Conclusion and discussion: Co-leadership promoted robust management by providing broader competence, continuous learning and joint responsibility for services. Integrated health and social care services should consider employing co-leadership as a managerial solution to achieve sustainability.

  2. Managing the tensions in integrating global organisations : The role of performance management systems

    NARCIS (Netherlands)

    Busco, C.; Giovannoni, E.; Scapens, R.W.

    The paper explores the role of performance management systems (PMSs) in integrating global organisations (GOs). It investigates the ways in which the diverse entities that comprise a GO can be co-ordinated and integrated to achieve a global unity of effort, while leaving space for local adaptation,

  3. Integrated refinery waste management

    Energy Technology Data Exchange (ETDEWEB)

    Shieh, Y -S [ETG Environmental, Inc., Blue Bell, PA (US); Sheehan, W J [Separation and Recovery Systems, Inc., Irvine, CA (US)

    1992-01-01

    In response to the RCRA land ban regulations and TC rule promulgated by the U.S. Federal Environmental Protection Agency (EPA) in 1988-1990, an Integrated Refinery Waste Management (IRWM) program has been developed to provide cost-effective solutions to petroleum industry customers. The goal of IRWM is to provide technology based remediation treatment services to manage sludges and wastewaters generated from the oil refining processes, soils contaminated with petroleum distillates and groundwater contaminated with fuels. Resource recovery, volume reduction and waste minimization are the primary choices to mitigate environmental problems. Oil recovery has been performed through phase separation (such as centrifugation and filtration) and heating of heavy oils. Volume reduction is achieved by dewatering systems such as centrifuges and filter presses, and low temperature thermal treatment. Waste minimization can be accomplished by bioremediation and resource recovery through a cement kiln. (Author).

  4. Plant life management. Progress for structural integrity

    International Nuclear Information System (INIS)

    Solin, J.

    2003-03-01

    A joint project cluster of industry, VTT and other R and D suppliers is dealing with managing of lifetime of critical structures and components in energy and process industry. The research topics include systematic component lifetime management, data management, integrity and lifetime of pressure bearing components, non-destructive inspection, interactions of coolant and materials, environmentally assisted cracking and ageing of reactor internals. This Symposium is a compilation of selected papers describing an intermediate status of the projects after three years of research and development. (orig.)

  5. Competitiveness in organizational integrated computer system project management

    Directory of Open Access Journals (Sweden)

    Zenovic GHERASIM

    2010-06-01

    Full Text Available The organizational integrated computer system project management aims at achieving competitiveness by unitary, connected and personalised treatment of the requirements for this type of projects, along with the adequate application of all the basic management, administration and project planning principles, as well as of the basic concepts of the organisational information management development. The paper presents some aspects of organizational computer systems project management competitiveness with the specific reference to some Romanian companies’ projects.

  6. Integrated waste and water management system

    Science.gov (United States)

    Murray, R. W.; Sauer, R. L.

    1986-01-01

    The performance requirements of the NASA Space Station have prompted a reexamination of a previously developed integrated waste and water management system that used distillation and catalytic oxydation to purify waste water, and microbial digestion and incineration for waste solids disposal. This system successfully operated continuously for 206 days, for a 4-man equivalent load of urine, feces, wash water, condensate, and trash. Attention is given to synergisms that could be established with other life support systems, in the cases of thermal integration, design commonality, and novel technologies.

  7. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  8. Understanding Organizational Memory from the Integrated Management Systems (ERP)

    OpenAIRE

    Gilberto Perez; Isabel Ramos

    2013-01-01

    With this research, in the form of a theoretical essay addressing the theme of Organizational Memory and Integrated Management Systems (ERP), we tried to present some evidence of how this type of system can contribute to the consolidation of certain features of Organizational Memory. From a theoretical review of the concepts of Human Memory, extending to the Organizational Memory and Information Systems, with emphasis on Integrated Management Systems (ERP) we tried to draw a parallel between ...

  9. Development of SFR Research and Integration Management System (S-RIMS)

    International Nuclear Information System (INIS)

    Cho, Chung Ho; Chang, Jin Wook; Kim, Young Gyun; Kim, Yeong Il

    2011-01-01

    Up to the present, the management of research and development (R and D) for a sodium cooled fast reactor (SFR) could be individually performed on each project without an organic relationship. However, a more systemic and effective integrated management of a project is required because the research and development environment is currently changing. Thus, we developed a Research and Integration Management System for SFR (S-RIMS) based on the enterprise project management (EPM) solution. The functional goals of the S-RIMS are as follows: 1. Provide data that show the progress and status of a project 2. Manage the design process and R and D products 3. Share the consistent design data between sub-projects

  10. CANDU plant life management - An integrated approach

    International Nuclear Information System (INIS)

    Hopkins, J.R.

    1998-01-01

    An integrated approach to plant life management has been developed for CANDU reactors. Strategies, methods, and procedures have been developed for assessment of critical systems structures and components and for implementing a reliability centred maintenance program. A Technology Watch program is being implemented to eliminate 'surprises'. Specific work has been identified for 1998. AECL is working on the integrated program with CANDU owners and seeks participation from other CANDU owners

  11. Initial perspectives on process threat management

    International Nuclear Information System (INIS)

    Whiteley, James R. Rob; Mannan, M. Sam

    2004-01-01

    Terrorist and criminal acts are now considered credible risks in the process industries. Deliberate attacks on the nation's petroleum refineries and chemical plants would pose a significant threat to public welfare, national security, and the US economy. To-date, the primary response of government and industry has been on improved security to prevent attacks and the associated consequences. While prevention is clearly preferred, the potential for successful attacks must be addressed. If plant security is breached, the extent of the inflicted damage is determined by the available plant safety systems and procedures. We refer to this 'inside the gate' response as process threat management. The authors have initiated a joint industry/academia study to address: - the level of safety provided by existing plant equipment and safety systems in response to a terrorist act, and; - identification of process (rather than security) needs or opportunities to address this new safety concern. This paper describes the initial perspectives and issues identified by the team at the beginning of the study

  12. Research on integrated managing system based on CIMS for nuclear power plant safety

    International Nuclear Information System (INIS)

    Zhou Gang

    2006-01-01

    In order to improve safety, economy and reliability of operation for nuclear power plant (NPP), a novel integrated managing method was proposed based on the ideas of computer and contemporary integrated manufacturing system (CIMS). The application of CIMS to nuclear power plant safety management was researched. In order to design an integrated managing system to meet the needs of NPP safety management, all work related to nuclear safety is divided into different category according to its characters. On basis of this work, general integrated managing system was designed at first. Then subsystems were designed and every subsystem implements a category of nuclear safety management work. All subsystems are independent relatively on the one hand and are interrelated on other hand by global information system. (authors)

  13. Integrating Energy and Environmental Management in Wood Furniture Industry

    Science.gov (United States)

    Babić, Milun; Jelić, Dubravka; Konćalović, Davor; Vukašinović, Vladimir

    2014-01-01

    As energy costs continue to rise, industrial plants (even those of energy nonintensive industries such as furniture industry) need effective way to reduce the amount of energy they consume. Besides, there are a number of economic and environmental reasons why a company should consider environmental management initiatives. This paper provides a detailed guideline for implementing joint energy and environmental management system in wood furniture industrial company. It covers in detail all essential aspects of the system: initial system assessment, organization, policy development, energy and environmental auditing, action plan development, system promotion, checking system performance, and management review. PMID:24587734

  14. Integrating energy and environmental management in wood furniture industry.

    Science.gov (United States)

    Gordić, Dušan; Babić, Milun; Jelić, Dubravka; Konćalović, Davor; Vukašinović, Vladimir

    2014-01-01

    As energy costs continue to rise, industrial plants (even those of energy nonintensive industries such as furniture industry) need effective way to reduce the amount of energy they consume. Besides, there are a number of economic and environmental reasons why a company should consider environmental management initiatives. This paper provides a detailed guideline for implementing joint energy and environmental management system in wood furniture industrial company. It covers in detail all essential aspects of the system: initial system assessment, organization, policy development, energy and environmental auditing, action plan development, system promotion, checking system performance, and management review.

  15. Ontario Hydro's integrated air management plan

    International Nuclear Information System (INIS)

    Kalvins, A.K.; Brown, D.; Camacho, F.; Howes, H.; Jantzi, B.; Lin, X.; Lui, P.; Melo, O.T.; Mortimer, W.P.; Reuber, B.

    1992-01-01

    Ontario Hydro is developing an integrated air management plan as a tool for comparing the environmental impacts of fossil-fuel power generation options. The goal is to relate equipment, location, emissions, and impacts and to identify the optimum way to manage the utility's fossil generation system in view of upcoming environmental regulations and public expectations. The eight steps of the plan are briefly described: definition of power generation scenarios (upgrading, conversion to natural gas, non-utility generation, alternative technologies); estimation of emissions for each generation and fuel option studied; identification of impact of air emissions on building materials, agriculture, forests, lakes, and fisheries; modelling of air emissions dispersion; quantification of damage to pollution receptors; quantification of full fuel cycle effects; and comparison of the scenarios. The scenario having the lowest overall environmental impact involved upgrading the existing fossil-fuel system with additional air emissions controls and two integrated gasification combined cycle plants. 9 refs., 3 figs., 3 tabs

  16. Developing an effective adaptive monitoring network to support integrated coastal management in a multiuser nature reserve

    Directory of Open Access Journals (Sweden)

    Pim Vugteveen

    2015-03-01

    Full Text Available We elaborate the necessary conceptual and strategic elements for developing an effective adaptive monitoring network to support Integrated Coastal Management (ICM in a multiuser nature reserve in the Dutch Wadden Sea Region. We discuss quality criteria and enabling actions essential to accomplish and sustain monitoring excellence to support ICM. The Wadden Sea Long-Term Ecosystem Research project (WaLTER was initiated to develop an adaptive monitoring network and online data portal to better understand and support ICM in the Dutch Wadden Sea Region. Our comprehensive approach integrates ecological and socioeconomic data and links research-driven and policy-driven monitoring for system analysis using indicators of pressures, state, benefits, and responses. The approach and concepts we elaborated are transferable to other coastal regions to accomplish ICM in complex social-ecological systems in which scientists, multisectoral stakeholders, resource managers, and governmental representatives seek to balance long-term ecological, economic, and social objectives within natural limits.

  17. Factors influencing implementation of integrated management of ...

    African Journals Online (AJOL)

    intern

    implementation of health facility based Integrated Management of Childhood Illness ... community-owned resource persons (CORPs) to provide health education to care ... differing coverage of basic essential services such safe water supply, ...

  18. Integrated Pest Management of the Southern Pine Beetle

    Science.gov (United States)

    Robert N. Coulson; Hannu Saarenmaa

    2011-01-01

    Integrated pest management (IPM) is the maintenance of destructive agents, including insects, at tolerable levels by the planned use of a variety of preventive, suppressive, or regulatory tactics and strategies that are ecologically and economically efficient and socially and politically acceptable. It is explicit that the actions taken are fully integrated into the...

  19. Integrated project management information systems: the French nuclear industry experience

    International Nuclear Information System (INIS)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-01-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK)

  20. Integrated project management information systems: the French nuclear industry experience

    Energy Technology Data Exchange (ETDEWEB)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-03-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK).

  1. How to Support the Integrate Management System through an Enterprise Content Management Platform?

    International Nuclear Information System (INIS)

    Couvreur, D.

    2016-01-01

    Full text: In 2010 the Belgian Nuclear Research Centre SCK-CEN decided to implement an ECM platform in order to manage its information. The main objectives were to centralize in one place all the right and latest versions of information, to improve the usage of internal information and to enhance the efficiency of our activities by standardization and by supporting document management processes. A programme of document migration for the whole institute was set up per group, running over four years. Steps were foreseen such as the comprehension of the activities of the end users in order to increase their efficiency, the analysis of type of documentation, the technical aspects, the migration of documents itself, the training and the most important steps—communication and supporting people to change. In 2013 SCK-CEN decided to implement an Integrated Management System. The objectives were i) to improve the safety performance of the organisation, ii) to foster, strengthen and support a strong safety and organizational culture through the development and reinforcement of good safety attitudes and behaviour in individuals and teams, iii) to structure, but at the same time simplify and make more transparent all processes of SCK-CEN clearly defining responsibilities and authorities, iv) to automate these processes by workflows and support the information and data flow by relevant databases. Intrinsically, both initiatives have the same end objective being the safety of the installations, of the knowledge and transfer of know-how on processes and projects related to radiation protection, reactor technology, waste and disposal, dismantling. In this paper, we will explain through examples. (author

  2. A Framework for Integration of IVHM Technologies for Intelligent Integration for Vehicle Management

    Science.gov (United States)

    Paris, Deidre E.; Trevino, Luis; Watson, Mike

    2005-01-01

    As a part of the overall goal of developing Integrated Vehicle Health Management (IVHM) systems for aerospace vehicles, the NASA Faculty Fellowship Program (NFFP) at Marshall Space Flight Center has performed a pilot study on IVHM principals which integrates researched IVHM technologies in support of Integrated Intelligent Vehicle Management (IIVM). IVHM is the process of assessing, preserving, and restoring system functionality across flight and ground systems (NASA NGLT 2004). The framework presented in this paper integrates advanced computational techniques with sensor and communication technologies for spacecraft that can generate responses through detection, diagnosis, reasoning, and adapt to system faults in support of IIVM. These real-time responses allow the IIVM to modify the effected vehicle subsystem(s) prior to a catastrophic event. Furthermore, the objective of this pilot program is to develop and integrate technologies which can provide a continuous, intelligent, and adaptive health state of a vehicle and use this information to improve safety and reduce costs of operations. Recent investments in avionics, health management, and controls have been directed towards IIVM. As this concept has matured, it has become clear the IIVM requires the same sensors and processing capabilities as the real-time avionics functions to support diagnosis of subsystem problems. New sensors have been proposed, in addition, to augment the avionics sensors to support better system monitoring and diagnostics. As the designs have been considered, a synergy has been realized where the real-time avionics can utilize sensors proposed for diagnostics and prognostics to make better real-time decisions in response to detected failures. IIVM provides for a single system allowing modularity of functions and hardware across the vehicle. The framework that supports IIVM consists of 11 major on-board functions necessary to fully manage a space vehicle maintaining crew safety and mission

  3. PGPB's pipeline integrity management system

    Energy Technology Data Exchange (ETDEWEB)

    Urencio, Claudio; Sanchez, Luis; Moreno, Carlos [PGPB - Pemex Gas y Petroquimica Basica (Mexico)

    2005-07-01

    Pemex Gas has 12,134 km of natural gas transmission pipelines, 1,835 Km for LPG and 1,216 Km for basic petrochemicals. The must part of this infrastructure was built in the 70's and reaching their 35 years of operating life. To manage the integrity of the three systems, Pemex Gas has a portfolio of technological tools. This tools allow the Company to improves the decision taking, align the budget with their strategic goals, achieve efficient asset utilization, and increase the value generation. The process of integrity management starts with the risk evaluation on assets, with the use of a software called IAP (Integrity Assessment Program). This information is integrated to the SIIA (Assets Identification System). The results of both software are used to the construction of the Risk Atlas, which identifies graphically each pipeline segment, with their related risk and factors that influence their behavior. The Risk Atlas gives us information about the consequences to the people, environment and facilities, so we can design customized plans to prevent or mitigate emergencies. Finally a detailed analysis of the resulting information and scenarios simulations help us to determine the best investment projects that will minimize the risk through all our assets. (author)

  4. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  5. Disaster Management: AN Integral Part of Science & Technology System and Land Administration-Management System

    Science.gov (United States)

    Ghawana, T.; Zlatanova, S.

    2016-06-01

    Disaster management is a multidisciplinary field, which requires a general coordination approach as well as specialist approaches. Science and Technology system of a country allows to create policies and execution of technical inputs required which provide services for the specific types of disasters management. Land administration and management agencies, as the administrative and management bodies, focus more on the coordination of designated tasks to various agencies responsible for their dedicated roles. They get help from Scientific and technical inputs & policies which require to be implemented in a professional manner. The paper provides an example of such integration from India where these two systems complement each other with their dedicated services. Delhi, the Capital of India, has such a disaster management system which has lot of technical departments of government which are mandated to provide their services as Emergency Service Functionaries. Thus, it is shown that disaster management is a job which is an integral part of Science & Technology system of a country while being implemented primarily with the help of land administration and management agencies. It is required that new policies or mandates for the Science and technology organizations of government should give a primary space to disaster management

  6. Barriers and Opportunities to Broader Adoption of Integrated Demand Side Management at Electric Utilities: A Scoping Study

    Energy Technology Data Exchange (ETDEWEB)

    Potter, Jennifer [Hawaii Natural Energy Institute, Honolulu, HI (United States); Stuart, Elizabeth [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Energy Analysis and Environmental Impacts Div.; Cappers, P [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Energy Analysis and Environmental Impacts Div.

    2018-02-13

    Integrated demand-side management (IDSM) is a strategic approach to designing and delivering a portfolio of demand side management (DSM) programs to customers. IDSM typically delivers customer centric strategies with the goal of increasing the amount of DSM in the field, but doing so in a way that integrates various measures and technologies to improve their collective performance and/or penetration. Specifically, IDSM can be defined as the integrated or coordinated delivery of three or more of: (1) energy efficiency (EE), (2) demand response (DR), (3) distributed generation (DG), (4) storage, (5) electric vehicle (EV) technologies, and (6) time-based rate programs to residential and commercial electric utility customers. The electric industry’s limited experience deploying IDSM to date suggests that significant barriers may exist. A Berkeley Lab report “Barriers and Opportunities to Broader Adoption of Integrated Demand Side Management at Electric Utilities: A Scoping Study” explores recent electric utility experience with IDSM to provide an assessment of the barriers and potential benefits perceived or experienced by program administrators in their attempts to implement integrated programs. The research draws on surveys and interviews with eleven staff from a sample of eight DSM program administrators and program implementers who were currently implementing or had previously attempted to implement an IDSM program or initiative. Respondents provided their perspectives on drivers for IDSM and barriers to broader deployment. They also reported on actions they had undertaken to promote expanded delivery of IDSM and provided their assessments of the most important under-tapped opportunities for expanding IDSM efforts, both for program administrator and regulatory organizations.

  7. Water management as a key component of integrated weed management

    Directory of Open Access Journals (Sweden)

    Antonio Berti

    2010-09-01

    Full Text Available Water management within the cropping system is a key factor for an integrated weed management. Soil moisture affects seed persistence and seed dormancy, thus influencing their germination, the establishment of seedlings as well as the competition at adult stage and the number, vitality and dormancy of the new seeds produced by the weeds. The interactions among water availability and competition are very complex and still not fully understood. A research effort in this sector should the be very relevant for the development of new approaches of weed management, such as “Ecological weed management”, aiming to reduce weed density and competitiveness and, in the medium term, to prevent undesired modifications of the weed flora.

  8. Weather information integration in transportation management center (TMC) operations.

    Science.gov (United States)

    2011-01-02

    This report presents the results of the third phase of an on-going FHWA study on weather integration in Transportation Management Center (TMC) operations. The report briefly describes the earlier phases of the integration study, summarizes the findin...

  9. Evolution of river management: up to integrated and beyond?

    NARCIS (Netherlands)

    Straatsma, M.W.; Nooij, R.J.W. de

    2010-01-01

    Integrated river management is heralded as the new style of river management, but it has been preceded by a number of previous styles, and is unlikely to be the last. This article presents the first analysis of the evolution of river management using Spiral Dynamics (SD). SD provides a growth

  10. Training plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2013-01-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...

  11. Test report : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2015-05-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) : Demonstration Project for the Dallas region. Coordinated corridor operations and management is : predicated on being able to share transportation informa...

  12. Final report : Dallas Integrated Corridor Management (ICM) Demonstration Project.

    Science.gov (United States)

    2015-08-01

    The Dallas Area Rapid Transit (DART) is leading the US-75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...

  13. Integrating research with management: The case of Katavi National ...

    African Journals Online (AJOL)

    Integrating research with management: The case of Katavi National Park, Tanzania. ... national park: (i) reduced water flow caused by local damming of the Katuma River, ... to both management and policy makers for tackling these problems.

  14. TWRS safety and technical integration risk management plan

    International Nuclear Information System (INIS)

    Fordham, R.A.

    1996-01-01

    The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making. The objective of this TWRS STI Risk Management Plan is to communicate a consistent approach to risk management that will be used by the organization

  15. INTEGRATION MECHANISMS OF IMPROVEMENT OF HUMAN RESOURCES MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Vera A. Akimenko

    2013-01-01

    Full Text Available In the current economic conditions, the efficiency of business processes of an organization is determined by the quality of the staff. Therefore, actual is the creation and application of new approaches to the management of human re-sources. The article presents a comparative analysis of management practices and their impact on the effectiveness of personnel management, the mechanism of their integration to improve the efficiency of the process.

  16. The Effect of Information Security Management on Organizational Processes Integration in Supply Chain

    Directory of Open Access Journals (Sweden)

    Mohsen Shafiei Nikabadi

    2012-03-01

    Full Text Available : The major purpose of this article was that how information security management has effect on supply chain integration and the effect of implementing "information security management system" on enhancing supplies chain integration. In this respect, current research was seeking a combination overview to these tow approaches (Information Security Management and Organizational Processes Integration by Enterprise Resources Planning System and after that determined factors of these two important issue by factor analysis. Researchers using a series of comments in the automotive experts (production planning and management and supply chain experts and caregivers car makers and suppliers in the first level and second level supply chain industry. In this way, it has been done that impact on how information security management processes enterprise supply chain integration with the help of statistical correlation analysis. The results of this investigation indicated effect of "information security management system" various dimensions that were coordination of information, prevent human errors and hardware, the accuracy of information and education for users on two dimensions of internal and external integration of business processes, supply chain and finally, it can increased integration of business processes in supply chain. At the end owing to quite these results, deployment of "information security management system" increased the integration of organizational processes in supply chain. It could be demonstrate with the consideration of relation of organizational integration processes whit the level of coordination of information, prevent errors and accuracy of information throughout the supply chain.

  17. Development and Implementation of Integrated Pest Management in ...

    African Journals Online (AJOL)

    Nafiisah

    This paper reviews the status of Integrated Pest Management (IPM) research in. Mauritius and also reports on the successful cases of IPM implementation during ... Tool. Activity. Status. Source. Biological control. Introduce parasitoids .... 10 g sugar in 1 L of water) in plastic bottles as one option to manage fruit flies in.

  18. Integrating Security Risk Management into Business Process Management for the Cloud

    OpenAIRE

    Goettelmann , Elio; Mayer , Nicolas; Godart , Claude

    2014-01-01

    International audience; Security issues are still preventing wider adoption of cloud computing, especially for businesses which are handling sensitive information. Indeed, by outsourcing its information system (IS), a company can lose control over its infrastructure, its software or even its data. Therefore, new methods and tools need to be defined to respond to this challenge. In this paper we propose to integrate Security Risk Management approaches into Business Process Management to effect...

  19. AN ASSESSMENT OF THE INTEGRATED PEST MANAGEMENT ...

    African Journals Online (AJOL)

    Integrated Pest Management Collaborative Research Support Program) has been applying a farmer participatory IPM strategy at on-farm research sites in eastern Uganda since 1995. Following five years of project implementation an evaluation ...

  20. Integrated solid waste management: a palliative to existing waste ...

    African Journals Online (AJOL)

    As a concept, Integrated Solid Waste Management (ISWM) is a sustainable ... on the perspective of consumers on waste generation, collection and disposal. ... to effective solid waste management in the case study area; non-sorting and ...

  1. INTEGRATED DOCUMENT MANAGEMENT SOLUTION FOR THE LOCAL GOVERNMENT

    Directory of Open Access Journals (Sweden)

    Nistor Razvan

    2013-07-01

    Full Text Available In this paper we present system analysis and design elements for the integrated document management solution at local governing authorities in the rural areas. While specifically dealing with the actual management of the Agricultural Register, an important primary unitary evidence document, we also keep a general character of the discussion, in order to argue for the generality of the proposed solution. Hence, for the identified and described problem space we propose an administrative and software infrastructure solution. This work is an empirical research in which our aim is primarily to identify key problems within the local governing authorities from several perspectives concerning the management of the Agricultural Register then to address those problems with an integrated document management system. For the proposed solution we give and argue the general system architecture and describe the key-mechanisms that support quality requirements. The relevance of this research concern is given by the impact of the actual Agricultural Register management on important stakeholders. This can be measured as the satisfaction felt by taxpayers and the performance of the local governing authorities, the Financial Administration, the Agency of Payments and Intervention in Agriculture and the Ministry of Agriculture and Rural Development. This work is also intended as a start-point for a new, modern thinking of the governing authorities in their pursue to improve public services. For this, in our work we highlight the importance of complete system analysis at all administrative levels as a main priority concern for all public managers. Our aim is the improvement of the public service by rising the awareness of the decision makers on the necessity of using integrated document management solutions for the provided services. Also, our work aims at increasing the efficiency with which nowadays, governing authorities invest public funds in various IT projects

  2. Revisiting Organisational Learning in Integrated Care.

    Science.gov (United States)

    Nuño-Solinís, Roberto

    2017-08-11

    Progress in health care integration is largely linked to changes in processes and ways of doing. These changes have knowledge management and learning implications. For this reason, the use of the concept of organisational learning is explored in the field of integrated care. There are very limited contributions that have connected the fields of organisational learning and care integration in a systematic way, both at the theoretical and empirical level. For this reason, hybridization of both perspectives still provides opportunities for understanding care integration initiatives from a research perspective as well as potential applications in health care management and planning.

  3. Integrated management of root-knot nematode (Meloidogyne ...

    African Journals Online (AJOL)

    Integrated management of root-knot nematode (Meloidogyne incognita) for tomato production and productivity. Bayuh Belay1* ... important food and cash crop of the farmers and is ...... some part of the research budget without any reservation.

  4. Monitoring the Long-Term Effectiveness of Integrated Safety Management System (ISMS) Implementation Through Use of a Performance Dashboard Process

    International Nuclear Information System (INIS)

    Kinney, Michael D.; Barrick, William D.

    2008-01-01

    This session will examine a method developed by Federal and Contractor personnel at the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) to examine long-term maintenance of DOE Integrated Safety Management System (ISMS) criteria, including safety culture attributes, as well as identification of process improvement opportunities. This process was initially developed in the summer of 2000 and has since been expanded to recognize the importance of safety culture attributes, and associated safety culture elements, as defined in DOE M 450.4-1, 'Integrated Safety Management System Manual'. This process has proven to significantly enhance collective awareness of the importance of long-term ISMS implementation as well as support commitments by NNSA/NSO personnel to examine the continued effectiveness of ISMS processes

  5. Strategic plan modelling by hospital senior administration to integrate diversity management.

    Science.gov (United States)

    Newhouse, John J

    2010-11-01

    Limited research suggests that some hospital senior administrators and chief executive officers (CEOs) have employed a strategic planning function to achieve diversity management practices. As the hospital industry struggles with how to integrate diversity practices to improve patient satisfaction, increase the quality of care and enhance clinical outcomes for minority populations, understanding the planning process involved in this endeavour becomes significant for senior hospital administrators. What is not well understood is what this strategic planning process represents and how it is applied to integrate diversity management. Scant research exists about the type of strategic models that hospital CEOs employ when they wish to reposition their organizations through diversity management. This study examines the strategic planning models used by senior administrators to integrate diversity management for an institutional-wide agenda. A qualitative survey process was used for CEOs in the states of New York, Pennsylvania, New Jersey and Delaware. The key research questions dealt with what type of strategic plan approach senior administrators used for integrating diversity management and what rationale they used to pursue this. Significant differences were reported between three types of strategic plan modelling used by CEOs. Also, when comparing past and current practices over time, such differences existed. The need to integrate diversity management is underscored by this study. How senior hospital administrators apply strategic plan models and what impact these approaches have represent the major implications that this study offers.

  6. The quality management system in leading organization of the integrated structure

    Directory of Open Access Journals (Sweden)

    Kunitsyn A. M.

    2018-02-01

    Full Text Available the article has analyzed the problem of integrated structure management. The author has noted that the implementation of recommendations outlined in the article will allow building and improving the quality management system in leading organization of integrated structure on a regular basis that meets the requirements.

  7. The Integrative University: Why University Management Is Different

    Science.gov (United States)

    Temple, Paul

    2008-01-01

    Managing universities "is" different from managing in most other sorts of organisation. In this article, the author shows why this claim is more than just special pleading, and how it relates to the particular form of the organisation. Appreciating their integrative aspects helps people to understand some of the difficulties that they regularly…

  8. Pesticides and public health: integrated methods of mosquito management.

    OpenAIRE

    Rose, R. I.

    2001-01-01

    Pesticides have a role in public health as part of sustainable integrated mosquito management. Other components of such management include surveillance, source reduction or prevention, biological control, repellents, traps, and pesticide-resistance management. We assess the future use of mosquito control pesticides in view of niche markets, incentives for new product development, Environmental Protection Agency registration, the Food Quality Protection Act, and improved pest management strate...

  9. INTEGRATION CHALLENGES OF UNIVERSITY AND INFORMATION MANAGEMENT SYSTEM (UIMS TO MOODLE

    Directory of Open Access Journals (Sweden)

    Jyldyzbek J. Jakshylykov

    2016-06-01

    Full Text Available Introduction: in 2006 an International Ataturk Ala-Too University (IAAU began to adopt internationally recognised Bologna system, which was initiated by the Ministry of Science and Education of Kyrgyz Republic because of problems of managerial and educational problems at universities in Kyrgyzstan. Consequently, IAAU had to improve its information and grading system and created University Information and Manage¬ment System (UIMS, which was developed by the university professional team including the author. At the same time, the university began to apply a Moodle software, which delivers open source management system programs, in order to appropriately manage teaching proc esses and manage courses online. Materials and Methods: the methodological basis of the research are descriptive method, analysis, and comparison. Results: however, the IAAU faced some challenged issues in the application of the two innovation, which was the integration challenges of those Moodle and UIMS. Hence, the main purpose of this study is to demonstrate benefits of Moodle and UIMS linking challenges. at first, this paper informs Moodle functions, features, advantages and disadvantages in a shortly manner and UIMS management features and primary functions, which included six fundamentally crucial processes with some graphical representations. In addition, the analysis and methodologies of two systems through identifying advantages and disadvantages for the possible integ ration. Discussion and Conclusions: at the end, some challenged issues were identified from analysis results, also Moodle and UIMS benefits were demonstrated in the International Ataturk Ala-Too University.

  10. QUANTITATIVE СHARACTERISTICS OF COMPLEMENTARY INTEGRATED HEALTH CARE SYSTEM AND INTEGRATED MEDICATION MANAGEMENT INFORMATION SYSTEM

    Directory of Open Access Journals (Sweden)

    L. Yu. Babintseva

    2015-05-01

    i mportant elements of state regulation of the pharmaceutical sector health. For the first time creation of two information systems: integrated medication management infor mation system and integrated health care system in an integrated medical infor mation area, operating based on th e principle of complementarity was justified. Global and technological coefficients of these systems’ functioning were introduced.

  11. Urban Pest Management. Selected Readings.

    Science.gov (United States)

    Cowles, Kathleen Letcher, Comp.; And Others

    These readings provide basic background information on urban integrated pest management and the development of Integrated Pest Management (IPM) programs for the control of rodents, cockroaches, and head lice. IPM is a decision-making process for deciding if pest supprssion treatments are needed, when they should be initiated, where they should be…

  12. Korean initiatives on nuclear knowledge management

    International Nuclear Information System (INIS)

    Chung, B.-J.; Kim, W.-G.

    2006-01-01

    Korean atomic energy activities have been the vigorous and ever expanding in the peaceful use of atomic energy. However for the last ten-year period, the new recruitments have been drastically reduced. The paper presents the nuclear manpower status in each nuclear related institute, which was surveyed in 2002. The ageing problem appears but is not very serious as a whole. The research institutes show more serious ageing problems compared to the industries. The paper also summarises the initiatives taken by Korean institutes related to the nuclear knowledge management activities with focus on the NtUss (Nuclear Technology Undergraduate Student Society) programme. (author)

  13. The integration of studio cycling into a worksite stress management programme.

    Science.gov (United States)

    Clark, Matthew M; Soyring, Jason E; Jenkins, Sarah M; Daniels, Denise C; Berkland, Bridget E; Werneburg, Brooke L; Hagen, Philip T; Lopez-Jimenez, Francisco; Warren, Beth A; Olsen, Kerry D

    2014-04-01

    High stress is a prevalent problem in the worksite. To reduce stress, improve productivity, reduce absenteeism, and lower healthcare costs, many companies offer exercise classes or stress management programmes. Although physical activity is an important component of stress management, few worksites have integrated physical activity into their comprehensive stress reduction programmes. The purpose of this single-arm pilot project was to examine the potential effectiveness of an integrated exercise (studio cycling) and cognitive-behavioural stress management programme. Eighty-four adults, 75% female, mostly aged 40+ years, participated in an integrated 12-week cycling studio and cognitive-behavioural stress management programme. Participants experienced a significant and clinically meaningful reduction on the Perceived Stress Scale (p manage stress at the programme's end and at a 1-month follow-up. Participants also reported having significantly improved overall health, improved nutritional habits, higher physical activity level, greater confidence in their ability to follow a healthy diet, higher spiritual well-being, improved sleep, receiving more support for maintaining healthy living and improved quality of life at the completion of the 12-week programme and 1-month follow-up. These findings provide further support for an integrated exercise and stress management programme. © 2013 John Wiley & Sons, Ltd.

  14. Management of information in development projects – a proposed integrated model

    Directory of Open Access Journals (Sweden)

    C. Bester

    2008-11-01

    Full Text Available The first section of the article focuses on the need for development in Africa and the specific challenges of development operations. It describes the need for a holistic and integrated information management model as part of the project management body of knowledge aimed at managing the information flow between communities and development project teams. It is argued that information, and access to information, is crucial in development projects and can therefore be seen as a critical success factor in any development project. In the second section of the article, the three information areas of the holistic and integrated information management model are described. In the section thereafter we suggest roles and actions for information managers to facilitate information processes integral to the model. These processes seek to create a developing information community that aligns itself with the development project, and supports and sustains it.

  15. Multiple sclerosis care: an integrated disease-management model.

    Science.gov (United States)

    Burks, J

    1998-04-01

    A disease-management model must be integrated, comprehensive, individual patient focused and outcome driven. In addition to high quality care, the successful model must reduce variations in care and costs. MS specialists need to be intimately involved in the long-term care of MS patients, while not neglecting primary care issues. A nurse care manager is the "glue" between the managed care company, health care providers and the patient/family. Disease management focuses on education and prevention, and can be cost effective as well as patient specific. To implement a successful program, managed care companies and health care providers must work together.

  16. Development of Information Management System for Plant Life Cycle Management

    International Nuclear Information System (INIS)

    Byon, SuJin; Lee, SangHyun; Kim, WooJoong

    2015-01-01

    The study subjects are S. Korean NPP(Nuclear Power Plant) construction projects. Design, construction, operations companies have different nuclear power plant construction project structures, and each company has its own Information Management System. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each lifecycle phase. The main perspective of Information Management is moving from the existent document-centric management to the data-centric management. To do so, we intend to integrate information with interfaces among systems. Integrated information management structure and management system are essential for an effective management of the lifecycle information of nuclear power plants that have a lifespan over as much as 80 years. The concept of integration management adopted by the defence, ocean industries or various PLM solution providers is important. Although the NPP project has application systems in each key lifecycle phase, it is more effective to develop and use PLIMS in consideration of the interface and compatibility of information among systems. As an initial study for development of that integrated information management structure, this study is building the system and has interfaced it with a design-stage system

  17. Development of Information Management System for Plant Life Cycle Management

    Energy Technology Data Exchange (ETDEWEB)

    Byon, SuJin; Lee, SangHyun; Kim, WooJoong [KOREA HYDRO and NUCLEAR POWER CO. LTD, Daejeon (Korea, Republic of)

    2015-10-15

    The study subjects are S. Korean NPP(Nuclear Power Plant) construction projects. Design, construction, operations companies have different nuclear power plant construction project structures, and each company has its own Information Management System. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each lifecycle phase. The main perspective of Information Management is moving from the existent document-centric management to the data-centric management. To do so, we intend to integrate information with interfaces among systems. Integrated information management structure and management system are essential for an effective management of the lifecycle information of nuclear power plants that have a lifespan over as much as 80 years. The concept of integration management adopted by the defence, ocean industries or various PLM solution providers is important. Although the NPP project has application systems in each key lifecycle phase, it is more effective to develop and use PLIMS in consideration of the interface and compatibility of information among systems. As an initial study for development of that integrated information management structure, this study is building the system and has interfaced it with a design-stage system.

  18. TIGER-NET – enabling an Earth Observation capacity for Integrated Water Resource Management in Africa

    DEFF Research Database (Denmark)

    Walli, A.; Tøttrup, C.; Naeimi, V.

    As part of the TIGER initiative [1] the TIGER-NET project aims to support the assessment and monitoring of water resources from watershed to transboundary basin level delivering indispensable information for Integrated Water Resource Management in Africa through: 1. Development of an open......-source Water Observation and Information Systems (WOIS) for monitoring, assessing and inventorying water resources in a cost-effective manner; 2. Capacity building and training of African water authorities and technical centers to fully exploit the increasing observation capacity offered by current...... and upcoming generations of satellites, including the Sentinel missions. Dedicated application case studies have been developed and demonstrated covering all EO products required by and developed with the participating African water authorities for their water resource management tasks, such as water reservoir...

  19. Integrating geographically isolated wetlands into land management decisions

    Science.gov (United States)

    Golden, Heather E.; Creed, Irena F.; Ali, Genevieve; Basu, Nandita; Neff, Brian; Rains, Mark C.; McLaughlin, Daniel L.; Alexander, Laurie C.; Ameli, Ali A.; Christensen, Jay R.; Evenson, Grey R.; Jones, Charles N.; Lane, Charles R.; Lang, Megan

    2017-01-01

    Wetlands across the globe provide extensive ecosystem services. However, many wetlands – especially those surrounded by uplands, often referred to as geographically isolated wetlands (GIWs) – remain poorly protected. Protection and restoration of wetlands frequently requires information on their hydrologic connectivity to other surface waters, and their cumulative watershed‐scale effects. The integration of measurements and models can supply this information. However, the types of measurements and models that should be integrated are dependent on management questions and information compatibility. We summarize the importance of GIWs in watersheds and discuss what wetland connectivity means in both science and management contexts. We then describe the latest tools available to quantify GIW connectivity and explore crucial next steps to enhancing and integrating such tools. These advancements will ensure that appropriate tools are used in GIW decision making and maintaining the important ecosystem services that these wetlands support.

  20. Integrating Identity Management With Federated Healthcare Data Models

    Science.gov (United States)

    Hu, Jun; Peyton, Liam

    In order to manage performance and provide integrated services, health care data needs to be linked and aggregated across data sources from different organizations. The Internet and secure B2B networks offer the possibility of providing near real-time integration. However, there are three major stumbling blocks. One is to standardize and agree upon a common data model across organizations. The second is to match identities between different locations in order to link and aggregate records. The third is to protect identity and ensure compliance with privacy laws. In this paper, we analyze three main approaches to the problem and use a healthcare scenario to illustrate how each one addresses different aspects of the problem while failing to address others. We then present a systematic framework in which the different approaches can be flexibly combined for a more comprehensive approach to integrate identity management with federated healthcare data models.

  1. DOE`s integrated low-level waste management program and strategic planning

    Energy Technology Data Exchange (ETDEWEB)

    Duggan, G. [Dept. of Energy, Washington, DC (United States). Office of Environmental Restoration and Waste Management; Hwang, J. [Science Applications International Corp., Germantown, MD (United States)

    1993-03-01

    To meet the DOE`s commitment to operate its facilities in a safe, economic, and environmentally sound manner, and to comply with all applicable federal, state, and local rules, regulations, and agreements, DOE created the Office of Environmental Restoration and Waste Management (EM) in 1989 to focus efforts on controlling waste management and cleaning up contaminated sites. In the first few years of its existence, the Office of Waste Management (EM-30) has concentrated on operational and corrective activities at the sites. In 1992, the Office of Waste Management began to apply an integrated approach to managing its various waste types. Consequently, DOE established the Low-Level Waste Management Program (LLWMP) to properly manage its complex-wide LLW in a consistent manner. The objective of the LLWMP is to build and operate an integrated, safe, and cost-effective program to meet the needs of waste generators. The program will be based on acceptable risk and sound planning, resulting in public confidence and support. Strategic planning of the program is under way and is expected to take two to three years before implementation of the integrated waste management approach.

  2. The Role of Standardization in Improving the Effectiveness of Integrated Risk Management

    OpenAIRE

    Ciocoiu, Carmen Nadia; Dobrea, Razvan Catalin

    2010-01-01

    The need of standardization in risk management is justified by the efforts to develop and introduce, during the last few years, integrated risk management frameworks inside the organizations. The financial crisis has underscored the fact that significant improvements in risk management organizations and capabilities are required. The business community and also the experts recognize that the risk management standards have an important role in improving the effectiveness of integrated risk man...

  3. Development of an Information Database for the Integrated Airline Management System (IAMS

    Directory of Open Access Journals (Sweden)

    Bogdane Ruta

    2017-08-01

    Full Text Available In present conditions the activity of any enterprise is represented as a combination of operational processes. Each of them corresponds to relevant airline management systems. Combining two or more management systems, it is possible to obtain an integrated management system. For the effective functioning of the integrated management system, an appropriate information system should be developed. This article proposes a model of such an information system.

  4. The Effect of Information Security Management on Organizational Processes Integration in Supply Chain

    OpenAIRE

    Mohsen Shafiei Nikabadi; Ahmad Jafarian; Azam Jalili Bolhasani

    2012-01-01

    : The major purpose of this article was that how information security management has effect on supply chain integration and the effect of implementing "information security management system" on enhancing supplies chain integration. In this respect, current research was seeking a combination overview to these tow approaches (Information Security Management and Organizational Processes Integration by Enterprise Resources Planning System) and after that determined factors of these two import...

  5. Integrating a mobile health setup in a chronic disease management network.

    Science.gov (United States)

    Ding, Hang; Ireland, Derek; Jayasena, Rajiv; Curmi, Jamie; Karunanithi, Mohan

    2013-01-01

    Supporting self management of chronic disease in collaboration with primary healthcare has been a national priority in order to mitigate the emerging disease burden on the already strained healthcare system. However, in practice, the uptake of self-management programs and compliance with clinical guidelines remain poor. Time constraints due to work commitments and lack of efficient monitoring tools have been the major barrier to the uptake and compliance. In this paper, we present a newly integrated mobile health system with a clinical chronic disease management network called cdmNet, which has already been validated to facilitate General Practitioners (GPs) to provide collaborative disease management services. The newly integrated solution takes advantage of the latest mobile web and wireless Bluetooth communication techniques to enable patients to record health data entries through ubiquitous mobile phones, and allows the data to be simultaneously shared by multidisciplinary care teams. This integration would enable patients to self-manage their chronic disease conditions in collaboration with GPs and hence, improve the uptake and compliance. Additionally, the proposed integration will provide a useful framework encouraging the translation of innovative mobile health technologies into highly regulated healthcare systems.

  6. Integrating science and resource management in Tampa Bay, Florida

    Science.gov (United States)

    Yates, Kimberly K.; Greening, Holly; Morrison, Gerold

    2011-01-01

    Tampa Bay is recognized internationally for its remarkable progress towards recovery since it was pronounced "dead" in the late 1970s. Due to significant efforts by local governments, industries and private citizens throughout the watershed, water clarity in Tampa Bay is now equal to what it was in 1950, when population in the watershed was less than one-quarter of what it is today. Seagrass extent has increased by more than 8,000 acres since the mid-1980s, and fish and wildlife populations are increasing. Central to this successful turn-around has been the Tampa Bay resource management community's long-term commitment to development and implementation of strong science-based management strategies. Research institutions and agencies, including Eckerd College, the Florida Wildlife Commission Fish and Wildlife Research Institute, Mote Marine Laboratory, National Oceanic and Atmospheric Administration, the Southwest Florida Water Management District, University of South Florida, U.S. Environmental Protection Agency, U.S. Geological Survey, local and State governments, and private companies contribute significantly to the scientific basis of our understanding of Tampa Bay's structure and ecological function. Resource management agencies, including the Tampa Bay Regional Planning Council's Agency on Bay Management, the Southwest Florida Water Management District's Surface Water Improvement and Management Program, and the Tampa Bay Estuary Program, depend upon this scientific basis to develop and implement regional adaptive management programs. The importance of integrating science with management has become fully recognized by scientists and managers throughout the region, State and Nation. Scientific studies conducted in Tampa Bay over the past 10–15 years are increasingly diverse and complex, and resource management programs reflect our increased knowledge of geology, hydrology and hydrodynamics, ecology and restoration techniques. However, a synthesis of this

  7. Functional Analysis for an Integrated Capability of Arrival/Departure/Surface Management with Tactical Runway Management

    Science.gov (United States)

    Phojanamongkolkij, Nipa; Okuniek, Nikolai; Lohr, Gary W.; Schaper, Meilin; Christoffels, Lothar; Latorella, Kara A.

    2014-01-01

    The runway is a critical resource of any air transport system. It is used for arrivals, departures, and for taxiing aircraft and is universally acknowledged as a constraining factor to capacity for both surface and airspace operations. It follows that investigation of the effective use of runways, both in terms of selection and assignment as well as the timing and sequencing of the traffic is paramount to the efficient traffic flows. Both the German Aerospace Center (DLR) and NASA have developed concepts and tools to improve atomic aspects of coordinated arrival/departure/surface management operations and runway configuration management. In December 2012, NASA entered into a Collaborative Agreement with DLR. Four collaborative work areas were identified, one of which is called "Runway Management." As part of collaborative research in the "Runway Management" area, which is conducted with the DLR Institute of Flight Guidance, located in Braunschweig, the goal is to develop an integrated system comprised of the three DLR tools - arrival, departure, and surface management (collectively referred to as A/D/S-MAN) - and NASA's tactical runway configuration management (TRCM) tool. To achieve this goal, it is critical to prepare a concept of operations (ConOps) detailing how the NASA runway management and DLR arrival, departure, and surface management tools will function together to the benefit of each. To assist with the preparation of the ConOps, the integrated NASA and DLR tools are assessed through a functional analysis method described in this report. The report first provides the highlevel operational environments for air traffic management (ATM) in Germany and in the U.S., and the descriptions of the DLR's A/D/S-MAN and NASA's TRCM tools at the level of details necessary to compliment the purpose of the study. Functional analyses of each tool and a completed functional analysis of an integrated system design are presented next in the report. Future efforts to fully

  8. Integrated management systems: survey results from Portuguese companies and experts

    OpenAIRE

    Domingues, Pedro; Sampaio, Paulo; Arezes, P.

    2012-01-01

    The proliferation of several certifiable sub-systems among different type of organizations lead companies to excessive departmentalization. This fact turned out to be, due to several reasons pointed out by numerous authors, disadvantageous. Hence, organizations optioned by integration of their management sub-systems. Academic awareness to this sociological event is mainly related with the fact of integration of management systems (IMS) had been performed empirically, that is, by each organiza...

  9. Guidelines for integrated risk assessment and management in large industrial areas. Inter-Agency programme on the assessment and management of health and environmental risks from energy and other complex industrial systems

    International Nuclear Information System (INIS)

    1998-01-01

    The IAEA, the United Nations Environment Programme (UNEP) within the framework of the Awareness and Preparedness for Emergencies at Local Level (APELL), the United Nations Industrial Development Organization (UNIDO) and the World Health Organization (WHO) decided in 1986 to join forces in order to promote the use of integrated area wide approaches to risk management. An Inter-Agency Programme, which brings together expertise in health the environment, industry and energy, all vital for effective risk management, was established. The Inter-Agency Programme on the assessment and Management of Health and Environmental Risks from Energy and Other Complex Industrial Systems aims at promoting and facilitating the implementation of integrated risk assessment and management for large industrial areas. This initiative includes the compilation of procedures and methods for environmental and public health risk assessment, the transfer of knowledge and experience amongst countries in the application of these procedures and the implementation of an integrated approach to risk management. The purpose of the Inter-Agency Programme is to develop a broad approach to the identification, prioritization and minimization of industrial hazards in a given geographical area. The UN organizations sponsoring this programme have been involved for several years in activities aimed at assessment and management of environmental and health risks, prevention of major accidents and emergency preparedness. These Guidelines have been developed on the basis of experience from these activities to assist in the planning and conduct of regional risk management projects. They provide a reference framework for the undertaking of integrated health and environmental risk assessment for large industrial areas and for the formulation of appropriate risk management strategies

  10. Guidelines for integrated risk assessment and management in large industrial areas. Inter-Agency programme on the assessment and management of health and environmental risks from energy and other complex industrial systems

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-01

    The IAEA, the United Nations Environment Programme (UNEP) within the framework of the Awareness and Preparedness for Emergencies at Local Level (APELL), the United Nations Industrial Development Organization (UNIDO) and the World Health Organization (WHO) decided in 1986 to join forces in order to promote the use of integrated area wide approaches to risk management. An Inter-Agency Programme, which brings together expertise in health the environment, industry and energy, all vital for effective risk management, was established. The Inter-Agency Programme on the assessment and Management of Health and Environmental Risks from Energy and Other Complex Industrial Systems aims at promoting and facilitating the implementation of integrated risk assessment and management for large industrial areas. This initiative includes the compilation of procedures and methods for environmental and public health risk assessment, the transfer of knowledge and experience amongst countries in the application of these procedures and the implementation of an integrated approach to risk management. The purpose of the Inter-Agency Programme is to develop a broad approach to the identification, prioritization and minimization of industrial hazards in a given geographical area. The UN organizations sponsoring this programme have been involved for several years in activities aimed at assessment and management of environmental and health risks, prevention of major accidents and emergency preparedness. These Guidelines have been developed on the basis of experience from these activities to assist in the planning and conduct of regional risk management projects. They provide a reference framework for the undertaking of integrated health and environmental risk assessment for large industrial areas and for the formulation of appropriate risk management strategies. Refs, figs, tabs.

  11. MoGIRE: A Model for Integrated Water Management

    Science.gov (United States)

    Reynaud, A.; Leenhardt, D.

    2008-12-01

    Climate change and growing water needs have resulted in many parts of the world in water scarcity problems that must by managed by public authorities. Hence, policy-makers are more and more often asked to define and to implement water allocation rules between competitive users. This requires to develop new tools aiming at designing those rules for various scenarios of context (climatic, agronomic, economic). If models have been developed for each type of water use however, very few integrated frameworks link these different uses, while such an integrated approach is a relevant stake for designing regional water and land policies. The lack of such integrated models can be explained by the difficulty of integrating models developed by very different disciplines and by the problem of scale change (collecting data on large area, arbitrate between the computational tractability of models and their level of aggregation). However, modelers are more and more asked to deal with large basin scales while analyzing some policy impacts at very high detailed levels. These contradicting objectives require to develop new modeling tools. The CALVIN economically-driven optimization model developed for managing water in California is a good example of this type of framework, Draper et al. (2003). Recent reviews of the literature on integrated water management at the basin level include Letcher et al. (2007) or Cai (2008). We present here an original framework for integrated water management at the river basin scale called MoGIRE ("Modèle pour la Gestion Intégrée de la Ressource en Eau"). It is intended to optimize water use at the river basin level and to evaluate scenarios (agronomic, climatic or economic) for a better planning of agricultural and non-agricultural water use. MoGIRE includes a nodal representation of the water network. Agricultural, urban and environmental water uses are also represented using mathematical programming and econometric approaches. The model then

  12. 77 FR 9226 - Physical Systems Integration, LLC; Supplemental Notice That Initial Market-Based Rate Filing...

    Science.gov (United States)

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER12-1013-000] Physical Systems Integration, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for... Physical Systems Integration, LLC's application for market-based rate authority, with an accompanying rate...

  13. ARE METHODS USED TO INTEGRATE STANDARDIZED MANAGEMENT SYSTEMS A CONDITIONING FACTOR OF THE LEVEL OF INTEGRATION? AN EMPIRICAL STUDY

    Directory of Open Access Journals (Sweden)

    Merce Bernardo

    2011-09-01

    Full Text Available Organizations are increasingly implementing multiple Management System Standards (M SSs and considering managing the related Management Systems (MSs as a single system.The aim of this paper is to analyze if methods us ed to integrate standardized MSs condition the level of integration of those MSs. A descriptive methodology has been applied to 343 Spanish organizations registered to, at least, ISO 9001 and ISO 14001. Seven groups of these organizations using different combinations of methods have been analyzed Results show that these organizations have a high level of integration of their MSs. The most common method used, was the process map. Organizations using a combination of different methods achieve higher levels of integration than those using a single method. However, no evidence has been found to confirm the relationship between the method used and the integration level achieved.

  14. Integrated solid waste management in Japan

    Energy Technology Data Exchange (ETDEWEB)

    Cohen, A.S. [CSI Resource Systems, Boston, MA (United States)

    1993-12-31

    The Japanese, through a combination of public policy, private market conditions, and geographic necessity, practice integrated municipal solid waste management as defined by the US Environmental Protection Agency. The Japanese have not defined a specific hierarchical preference for alternative waste management practices, i.e., waste reduction, reuse and recycling, combustion, composting, and landfill disposal. However, in marked contrast to the US approach, the Japanese system relies heavily on waste combustion, with and without energy recovery. {open_quotes}Discards{close_quotes}, as the term is used in this paper, refers to all materials considered used and spent by residential and commercial generators. That which is discarded (whether recyclable or nonrecyclable) by a municipality is referred to as MSW. This paper provides an overview of MSW management practices and private-sector recycling in Japan. Estimates of the total generation of residential and commercial discards and their disposition are also presented. Such an overview of Japanese practices can be used to assess the potential effectiveness of US integrated solid waste management programs. Of the estimated 61.3 to 72.1 million tons of residential and commercial discards generated in Japan during its 1989 fiscal year (April 1, 1989, through March 31, 1990), an estimated 55 to 64 percent was incinerated; 15 to 28 percent was recycled (only 2 to 3 percent through municipal recycling activities); less than 0.1 percent was composted or used as animal feed; and 17 to 20 percent was landfilled. Including ash disposal, 26 to 30 percent, by weight, of the gross discards were landfilled.

  15. Optimal stability polynomials for numerical integration of initial value problems

    KAUST Repository

    Ketcheson, David I.

    2013-01-08

    We consider the problem of finding optimally stable polynomial approximations to the exponential for application to one-step integration of initial value ordinary and partial differential equations. The objective is to find the largest stable step size and corresponding method for a given problem when the spectrum of the initial value problem is known. The problem is expressed in terms of a general least deviation feasibility problem. Its solution is obtained by a new fast, accurate, and robust algorithm based on convex optimization techniques. Global convergence of the algorithm is proven in the case that the order of approximation is one and in the case that the spectrum encloses a starlike region. Examples demonstrate the effectiveness of the proposed algorithm even when these conditions are not satisfied.

  16. I-15 integrated corridor management : system requirements.

    Science.gov (United States)

    2011-07-01

    This document is intended as a listing and discussion of the Requirements for the I-15 Integrated Corridor Management System : (ICMS) Demonstration Project in San Diego. This document describes what the system is to do (the functional requirements), ...

  17. AREVA Logistics Business Unit Transportation Risk Management Initiative

    International Nuclear Information System (INIS)

    Anne, C.

    2009-01-01

    A safe, secure and reliable transportation organization is a key component for the success of the nuclear industry. With the forecasted increase of radioactive material transport flows in future and the changing environment, AREVA Logistic Business Unit (L-BU) must ensure that safety and security risks are minimized but also ensure of the chain supply for its various facilities (mines, conversion, enrichment, fuel manufacturing, reprocessing, etc). AREVA L-BU Unit is implementing a transportation risk management initiative for the radioactive shipments of the AREVA group across all the Business Unit involved in shipments of radioactive and nuclear materials. The paper will present the four main components of the risk management. (authors)

  18. Organising Sustainability Competencies through Quality Management: Integration or Specialisation

    Directory of Open Access Journals (Sweden)

    Vanajah Siva

    2018-04-01

    Full Text Available A significant step in integrating environmental sustainability into daily operations is through product development. One way to achieve such integration of environmental considerations into product development is by relating sustainability competencies to practices of Quality Management. However, practices seem to vary for how competencies within environmental sustainability are organised in order to make sustainability more actionable. This study explores two ways of organising sustainability competencies in product development: integration and specialisation. The organisation of sustainability competency is illustrated through two cases; one case in which sustainability is integrated with the quality management competency, and the other in which a new competency focusing on sustainability has been added as a separate function in product development. It is suggested that the organisation of sustainability competency influences the extent of environmental impact. Further, trade-offs, such as material source versus weight may not be exploited when sustainability is integrated as one area of responsibility for another specialty competency, suggesting a lack of sufficient competency within environmental sustainability to recognise potential trade-offs between—for example—quality and environmental impact.

  19. Integrated and ecosystemic approaches for bridging the gap between environmental management and port management.

    Science.gov (United States)

    García-Onetti, Javier; Scherer, Marinez E G; Barragán, Juan Manuel

    2018-01-15

    The rapid exploitation of coastal and marine ecosystemic capital is on course to reach a critical point. The difficulty of implementing Integrated and ecosystem based management models, taking into the account the great complexity of the marine socio-ecological systems, has resulted in a significant gap between theory and practice. The majority of authors emphasize difficulties in engaging and convincing private stakeholders and a number of economic sectors involved in these processes. This reticence is traditionally more pronounced in the port sector, despite their important role in the transformation of coastal and marine areas. This paper seeks to establish bridges between the Environmental Management systems and Tools (EMT) of economic sectors and the Integrated and Ecosystem Based Management models (IEBM). To achieve this goal, an effort has been made to rethink concepts and principles traditionally used in EMT to bring them into line with those of IEBM. A DPSIR adapted framework is proposed and applied in a conceptual model, where the necessary elements for environmental management tools and ecosystemic models coexist. The logic of ecosystem services has been included, with special attention to the variable of human behaviour. How the proposals fit into the reality of the maritime-port sector was analysed in a transversal way, seeking Socio-Ecological Port System (SEPS) perspectives. This made it possible to move from Environmental Management Systems to an Integrated and Ecosystem Based Port Environmental Management System (PEMS-IEB). From a managerial perspective, it was also suggested that an additional DPSIR framework should be applied to the "response" component, the management system itself, understood as a system with its own elements, processes and interrelations. Copyright © 2017 Elsevier Ltd. All rights reserved.

  20. Integrated Systems Health Management for Intelligent Systems

    Science.gov (United States)

    Figueroa, Fernando; Melcher, Kevin

    2011-01-01

    The implementation of an integrated system health management (ISHM) capability is fundamentally linked to the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system. It is akin to having a team of experts who are all individually and collectively observing and analyzing a complex system, and communicating effectively with each other in order to arrive at an accurate and reliable assessment of its health. In this paper, concepts, procedures, and approaches are presented as a foundation for implementing an intelligent systems ]relevant ISHM capability. The capability stresses integration of DIaK from all elements of a system. Both ground-based (remote) and on-board ISHM capabilities are compared and contrasted. The information presented is the result of many years of research, development, and maturation of technologies, and of prototype implementations in operational systems.

  1. Asset management -- Integrated software optimizes production performance

    International Nuclear Information System (INIS)

    Polczer, S.

    1998-01-01

    Developments in data collection and retrieval systems to allow timely cost analysis, financial reporting and production management are discussed. One of the most important new OLAP (on-line analytical processing) products is Energy Warehouse which gathers field information from various sources, allows advanced searches, and generates reports previously unavailable in other conventional financial accounting systems. Another OLAP-based system, the Canadian Upstream Energy System (CUES), was developed by the Oracle Corporation and the Calgary-based Applied Terravision Systems (ATS) Inc. CUES combines Oracle's universal data server software development tools with ATS's upstream financial, land, geotechnical and production applications. ATS also developed a product called IDPMARS (Integrated Daily Production Management Accounting Reporting System). It interfaces with CUES to link working interests, government royalties, administration, facility charges, lifting costs, transportation tooling, and customers by integrating field data collection systems with financial accounting

  2. Asset management -- Integrated software optimizes production performance

    Energy Technology Data Exchange (ETDEWEB)

    Polczer, S.

    1998-10-01

    Developments in data collection and retrieval systems to allow timely cost analysis, financial reporting and production management are discussed. One of the most important new OLAP (on-line analytical processing) products is Energy Warehouse which gathers field information from various sources, allows advanced searches, and generates reports previously unavailable in other conventional financial accounting systems. Another OLAP-based system, the Canadian Upstream Energy System (CUES), was developed by the Oracle Corporation and the Calgary-based Applied Terravision Systems (ATS) Inc. CUES combines Oracle`s universal data server software development tools with ATS`s upstream financial, land, geotechnical and production applications. ATS also developed a product called IDPMARS (Integrated Daily Production Management Accounting Reporting System). It interfaces with CUES to link working interests, government royalties, administration, facility charges, lifting costs, transportation tooling, and customers by integrating field data collection systems with financial accounting.

  3. DOE-RL Integrated Safety Management System Description

    International Nuclear Information System (INIS)

    SHOOP, D.S.

    2000-01-01

    The purpose of this Integrated Safety Management System Description (ISMSD) is to describe the U.S. Department of Energy (DOE), Richland Operations Office (RL) ISMS as implemented through the RL Integrated Management System (RIMS). This ISMSD does not impose additional requirements but rather provides an overview describing how various parts of the ISMS fit together. Specific requirements for each of the core functions and guiding principles are established in other implementing processes, procedures, and program descriptions that comprise RIMS. RL is organized to conduct work through operating contracts; therefore, it is extremely difficult to provide an adequate ISMS description that only addresses RL functions. Of necessity, this ISMSD contains some information on contractor processes and procedures which then require RL approval or oversight. This ISMSD does not purport to contain a full description of the contractors' ISM System Descriptions

  4. DOE-RL Integrated Safety Management System Description

    CERN Document Server

    Shoop, D S

    2000-01-01

    The purpose of this Integrated Safety Management System Description (ISMSD) is to describe the U.S. Department of Energy (DOE), Richland Operations Office (RL) ISMS as implemented through the RL Integrated Management System (RIMS). This ISMSD does not impose additional requirements but rather provides an overview describing how various parts of the ISMS fit together. Specific requirements for each of the core functions and guiding principles are established in other implementing processes, procedures, and program descriptions that comprise RIMS. RL is organized to conduct work through operating contracts; therefore, it is extremely difficult to provide an adequate ISMS description that only addresses RL functions. Of necessity, this ISMSD contains some information on contractor processes and procedures which then require RL approval or oversight. This ISMSD does not purport to contain a full description of the contractors' ISM System Descriptions.

  5. Sustainable energy development as an integral part of hydroelectric business management

    International Nuclear Information System (INIS)

    Lee, W.; Yu, M.; Young, C.

    1996-01-01

    Elements of Ontario Hydro's strategy for sustainable energy development were discussed, highlighting key developments in the business management practices in Ontario Hydro's Hydroelectric Business Unit. Sustainable development considerations are now integral part of any business case analysis; management of the environment also has been integrated into the Utilities' business management process. Several environmental management practices intended to enhance sustainability have been introduced, including a full-fledged environmental management system based on ISO 14001 standards. Energy efficiency opportunities are aggressively pursued, including turbine upgrades, and energy efficient lighting. Experience to date indicates that business performance and progress towards sustainable energy development need not be mutually exclusive

  6. Viability of Event Management Business in Batangas City, Philippine: Basis for Business Operation Initiatives

    OpenAIRE

    Jeninah Christia D. Borbon

    2016-01-01

    The research study on Viability of Event Management Business in Batangas City: Basis for Business Operation Initiatives aimed to assess the viability of this type of business using Thompson’s (2005) Dimension of Business Viability as its tool in order to create business operation initiatives. It provided a good framework for defining success factors in entrepreneurial operation initiatives in a specific business type – event management. This study utilized event organizers based i...

  7. Integrated Management System, Configuration and Document Control for Research Reactors

    International Nuclear Information System (INIS)

    Steynberg, B.J.; Bruyn, J.F. du

    2017-01-01

    An integrated management system is a single management framework establishing all the processes necessary for the organisation to address all its goals and objectives. Very often only quality, environment and health & safety goals are included when referred to an integrated management system. However, within the research reactor environment such system should include goals pertinent to economic, environmental, health, operational, quality, safeguards, safety, security, and social considerations. One of the important objectives of an integrated management is to create the environment for a healthy safety culture. Configuration management is a disciplined process that involves both management and technical direction to establish and document the design requirements and the physical configuration of the research reactor and to ensure that they remain consistent with each other and the documentation. Configuration is the combination of the physical, functional, and operational characteristics of the structures, systems, and components (SSCs) or parts of the research reactor, operation, or activity. The basic objectives and general principles of configuration management are the same for all research reactors. The objectives of configuration management are to: a) Establish consistency among design requirements, physical configuration, and documentation (including analyses, drawings, and procedures) for the research reactor; b) Maintain this consistency throughout the life of the research reactor, particularly as changes are being made; and c) Retain confidence in the safety of the research reactor. The key elements needed to manage the configuration of research reactors are design requirements, work control, change control, document control, and configuration management assessments. The objective of document control is to ensure that only the most recently approved versions of documents are used in the process of operating, maintaining, and modifying the research reactor

  8. Integrated management systems. Advantages and disadvantages; difficulties and recommendations in the process of implementation

    Directory of Open Access Journals (Sweden)

    Aneta Wysokińska-Senkus

    2011-01-01

    Full Text Available Nowadays, organisations are constantly looking for methods to improve their efficiency and to guarantee them a competitive advantage, sustainable profitable growth and ability to survive in a turbulent environment. An increasing popularity of implementation of certified management systems has been noticed. The most often integrated management system are eg. ISO 9001, ISO 14001, ISO 18001. The paper presents the conditions for the implementation of an integrated management system (IMS, the characteristics of the most integrated management systems, the advantages and disadvantages of integration and the difficulties in the implementation of IMS and recommendations regarding the effectiveness of the integration of IMS.

  9. Integrated solid waste management in Japan

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    The Japanese, through a combination of public policy, private market conditions, a geographic necessity, practice integrated municipal solid waste (MSW) management. The approach of MSW management in Japan is as follows: The basic concept of refuse treatment consists of recycling discharged refuse into usable resources, reusing such resources as much as possible, and then treating or disposing of the usable portion into a sanitary condition. Considering the difficulty of procuring land or seaside areas for such purpose as a refuse disposal site, it will be necessary to minimize the volume of refuse collected for treatment or disposal.

  10. Pro-ACT II: integrating utilization management, discharge planning, and nursing case management into the outcomes manager role.

    Science.gov (United States)

    Brett, J L; Bueno, M; Royal, N; Kendall-Sengin, K

    1997-02-01

    Building on redesign efforts that created case management, clinical care technicians, support service hosts, and pharmacy technician roles, this redesign focused on integrating case management, utilization management, and discharge planning functions into a new outcomes manager role. The authors describe the process of developing and implementing the new role and outline specific actions that eliminated redundancy and inefficiency. Results of the evaluation of the project are reviewed, including full-time equivalent and salary savings and employee and physician satisfaction improvements.

  11. ESG Integration and the Investment Management Process : Fundamental Investing Reinvented

    NARCIS (Netherlands)

    van Duuren, Emiel; Plantinga, Auke; Scholtens, Bert

    2016-01-01

    We investigate how conventional asset managers account for environmental, social and governance factors (ESG) in their investment process. We do so on the basis of an international survey among fund managers. We find that many conventional managers integrate responsible investing in their investment

  12. Integrated logistics management system for operation of machinery and equipment

    Directory of Open Access Journals (Sweden)

    Józef Frąś

    2014-09-01

    Full Text Available Background: The main issue in the operations of machinery and equipment, which is the subject of theoretical and empirical research is to provide high reliability and durability with qualitative post-trade services of machinery and equipment. Quality of service can be achieved through planned maintenance activities supported by computer technology. The article presents the concept of an integrated system of logistics management operation of machinery and equipment, especially special one for stationary transport equipment. At the outset, it emphasized the importance and essence of technological transport and storage systems storage in modern manufacturing enterprise. Then the objective and the method of research have been set. An essential part of deliberations in the article is the concept of integrated logistics management system operation for stationary transport equipment. Authors of this article have presented the results the implementation and operation of the system. The results are presented in a descriptive and graphic form. Methods: The purpose of this article is to present the concept of implementing an integrated logistics management system for operation of stationary transport equipment. It goes through combination of planning, event logging service, warehouse management in the field of spare parts, account and records of the cost of service activities. The paper presents an analysis and evaluation method of brainstorming a new approach to logistics management operation stationary transport equipment. Authors takes into account the specific conditions of use of transport equipment and conduct the service, which have a significant impact on the time and place of cost and service as well. It should be noted that the developed system has been implemented. It was also carried out an assessment of its functionality and efficiency as the new IT tool for logistics management operation. Results and conclusions: The paper presents a new

  13. Integrated Global Nuclear Materials Management Preliminary Concepts

    International Nuclear Information System (INIS)

    Jones, E; Dreicer, M.

    2006-01-01

    The world is at a turning point, moving away from the Cold War nuclear legacy towards a future global nuclear enterprise; and this presents a transformational challenge for nuclear materials management. Achieving safety and security during this transition is complicated by the diversified spectrum of threat 'players' that has greatly impacted nonproliferation, counterterrorism, and homeland security requirements. Rogue states and non-state actors no longer need self-contained national nuclear expertise, materials, and equipment due to availability from various sources in the nuclear market, thereby reducing the time, effort and cost for acquiring a nuclear weapon (i.e., manifestations of latency). The terrorist threat has changed the nature of military and national security requirements to protect these materials. An Integrated Global Nuclear Materials Management (IGNMM) approach would address the existing legacy nuclear materials and the evolution towards a nuclear energy future, while strengthening a regime to prevent nuclear weapon proliferation. In this paper, some preliminary concepts and studies of IGNMM will be presented. A systematic analysis of nuclear materials, activities, and controls can lead to a tractable, integrated global nuclear materials management architecture that can help remediate the past and manage the future. A systems approach is best suited to achieve multi-dimensional and interdependent solutions, including comprehensive, end-to-end capabilities; coordinated diverse elements for enhanced functionality with economy; and translation of goals/objectives or standards into locally optimized solutions. A risk-informed basis is excellent for evaluating system alternatives and performances, and it is especially appropriate for the security arena. Risk management strategies--such as defense-in-depth, diversity, and control quality--help to weave together various technologies and practices into a strong and robust security fabric. Effective

  14. Sustainable Waste Management for Green Highway Initiatives

    Directory of Open Access Journals (Sweden)

    Husin Nur Illiana

    2016-01-01

    Full Text Available Green highway initiative is the transportation corridors based on sustainable concept of roadway. It incorporates both transportation functionality and ecological requirements. Green highway also provides more sustainable construction technique that maximizes the lifespan of highway. Waste management is one of the sustainable criterias in the elements of green highway. Construction of highway consumes enormous amounts of waste in term of materials and energy. These wastes need to be reduce to sustain the environment. This paper aims to identify the types of waste produced from highway construction. Additionally, this study also determine the waste minimization strategy and waste management practiced.. This study main focus are construction and demolition waste only. The methodology process begin with data collection by using questionnaire survey. 22 concession companies listed under Lembaga Lebuhraya Malaysia acted as a respondent. The questionnaires were distributed to all technical department staffs. The data received was analyzed using IBM SPSS. The results shows the most production of waste is wood, soil, tree root and concrete. The least production of waste is metal. For waste minimization, the best waste minimization is reuse for all type of waste except for tree root and stump. Whereas, the best waste management is providing strategic plan. The least practice for waste management is recording the quantity of waste.

  15. Impediments to integrated urban stormwater management: the need for institutional reform.

    Science.gov (United States)

    Brown, Rebekah R

    2005-09-01

    It is now well established that the traditional practice of urban stormwater management contributes to the degradation of receiving waterways, and this practice was more recently critiqued for facilitating the wastage of a valuable water resource. However, despite significant advances in alternative "integrated urban stormwater management" techniques and processes over the last 20 years, wide-scale implementation has been limited. This problem is indicative of broader institutional impediments that are beyond current concerns of strengthening technological and planning process expertise. Presented here is an analysis of the institutionalization of urban stormwater management across Sydney with the objective of scoping institutional impediments to more sustainable management approaches. The analysis reveals that the inertia with the public administration of urban stormwater inherently privileges and perpetuates traditional stormwater management practices at implementation. This inertia is characterized by historically entrained forms of technocratic institutional power and expertise, values and leadership, and structure and jurisdiction posing significant impediments to change and the realization of integrated urban stormwater management. These insights strongly point to the need for institutional change specifically directed at fostering horizontal integration of the various functions of the existing administrative regime. This would need to be underpinned with capacity-building interventions targeted at enabling a learning culture that values integration and participatory decision making. These insights also provide guideposts for assessing the institutional and capacity development needs for improving urban water management practices in other contexts.

  16. Integrated Management System - Scope, Possibilities And Methodology

    Science.gov (United States)

    Čekanová, Katarína

    2015-06-01

    Organizations are becoming more aware of the importance of integrated management systems (IMS). Interest in this subject indicates that IMS are seen as "management systems of the future". Based on this, the aim of this articles characterizes the possibility of building IMS through the identification of common elements and specific requirements in accordance with the ISO 9001, ISO 14001 and OHSAS 18001 professional references. Part of the article is the methodology of building IMS in the organization.

  17. DESIGN OF INFORMATION MANAGEMENT SYSTEM OF VERTICALLY INTEGRATED AGRICULTURAL HOLDINGS

    Directory of Open Access Journals (Sweden)

    Александр Витальевич ШМАТКО

    2015-05-01

    Full Text Available The paper deals with an approach to the design and development of information systems for the management and optimization of the organizational structure of vertically integrated agricultural holdings. A review of the problems of building and improving the organizational structure of vertically integrated agricultural holding is made. A method of constructing a discrete model management structure agricultural holding, which minimizes the costs associated with attracting applicants to work, is proposed.

  18. Acute upper gastrointestinal bleeding (UGIB) - initial evaluation and management.

    Science.gov (United States)

    Khamaysi, Iyad; Gralnek, Ian M

    2013-10-01

    Acute upper gastrointestinal bleeding (UGIB) is the most common reason that the 'on-call' gastroenterologist is consulted. Despite the diagnostic and therapeutic capabilities of upper endoscopy, there is still significant associated morbidity and mortality in patients experiencing acute UGIB, thus this is a true GI emergency. Acute UGIB is divided into non-variceal and variceal causes. The most common type of acute UGIB is 'non-variceal' and includes diagnoses such as peptic ulcer (gastric and duodenal), gastroduodenal erosions, Mallory-Weiss tears, erosive oesophagitis, arterio-venous malformations, Dieulafoy's lesion, and upper GI tract tumours and malignancies. This article focuses exclusively on initial management strategies for acute upper GI bleeding. We discuss up to date and evidence-based strategies for patient risk stratification, initial patient management prior to endoscopy, potential causes of UGIB, role of proton pump inhibitors, prokinetic agents, prophylactic antibiotics, vasoactive pharmacotherapies, and timing of endoscopy. Copyright © 2013 Elsevier Ltd. All rights reserved.

  19. Environmental Management Integration Project/Mixed Waste Focus Area Partnership

    International Nuclear Information System (INIS)

    Gombert, D.; Kristofferson, K.; Cole, L.

    1999-01-01

    On January 16, 1998, the Assistant Secretary for the Environmental Management (EM) Program at the Department of Energy, issued DOE-Idaho the Program Integration and Systems Engineering Guidance for Fiscal Year 1998, herein called Guidance, which directed that program integration tasks be performed for all EM program areas. This guidance directed the EM Integration team, as part of the Task 1, to develop baseline waste and material disposition maps which are owned by the site Project Baseline Summary (PBS) manager. With these baselines in place Task 2 gave direction to link Science and Technology activities to the waste and material stream supported by that technology. This linkage of EM Program needs with the OST activities supports the DOE goal of maximizing cleanup at DOE sites by 2006 and provides a defensible science and technology program. Additionally, this linkage is a valuable tool in the integration of the waste and material disposition efforts for the DOE complex

  20. Value Co-creation as Part of an Integrative Vision of Innovation Management

    DEFF Research Database (Denmark)

    Gerstlberger, Wolfgang; Knudsen, Mette Præst; Tanev, Stoyan

    2009-01-01

    Value co-creation is an emerging concept in business, marketing and innovation management. Its growing interest points to the emergence of a new semantic wave in innovation research that requires the adoption of new terminology, frameworks and fields of research exploration. There is a number...... an attempt to position the value co-creation paradigm within an integrative vision for innovation management research and practices. This positioning is a challenging task as the meaning of the terms "value co-creation" and "integrative" innovation management need to be more fully clarified. We attempt...... to identify an appropriate plane of conceptual integrity that could be used to describe the innovation management field within the context of its relation to value co-creation....

  1. Integrated System Health Management Development Toolkit

    Science.gov (United States)

    Figueroa, Jorge; Smith, Harvey; Morris, Jon

    2009-01-01

    This software toolkit is designed to model complex systems for the implementation of embedded Integrated System Health Management (ISHM) capability, which focuses on determining the condition (health) of every element in a complex system (detect anomalies, diagnose causes, and predict future anomalies), and to provide data, information, and knowledge (DIaK) to control systems for safe and effective operation.

  2. Integrated Weed Management Strategies for Control of Hydrilla

    National Research Council Canada - National Science Library

    Nelson, Linda S; Shearer, Judy F

    2009-01-01

    ...), and the fungal pathogen Mycoleptodiscus terrestris (Gerd.) Ostazeski, applied alone and in combination with one another, as an integrated weed management strategy against the nuisance aquatic plant, hydrilla...

  3. On the initial condition problem of the time domain PMCHWT surface integral equation

    KAUST Repository

    Uysal, Ismail Enes; Bagci, Hakan; Ergin, A. Arif; Ulku, H. Arda

    2017-01-01

    Non-physical, linearly increasing and constant current components are induced in marching on-in-time solution of time domain surface integral equations when initial conditions on time derivatives of (unknown) equivalent currents are not enforced

  4. Challenges of Integrated Pest Management in Sub-Saharan Africa

    NARCIS (Netherlands)

    Huis, van A.

    2009-01-01

    a response to the negative side effects of chemical control in the developed world, Integrated Pest Management (IPM) developed with an emphasis on reducing the role of pesticides. Later the role of natural enemies was recognized as being the cornerstone for sustainable pest management strategies.

  5. Integrating total quality management in a library setting

    CERN Document Server

    Jurow, Susan

    2013-01-01

    Improve the delivery of library services by implementing total quality management (TQM), a system of continuous improvement employing participative management and centered on the needs of customers. Although TQM was originally designed for and successfully applied in business and manufacturing settings, this groundbreaking volume introduces strategies for translating TQM principles from the profit-based manufacturing sector to the library setting. Integrating Total Quality Management in a Library Setting shows librarians how to improve library services by implementing strategies such as employ

  6. Managing the physics of the economics of integrated health care.

    Science.gov (United States)

    Zismer, Daniel K; Werner, Mark J

    2012-01-01

    The physics metaphor, as applied to the economics (and financial performance) of the integrated health system, seems appropriate when considered together with the nine principles of management framework provided. The nature of the integrated design enhances leaders' management potential as they consider organizational operations and strategy in the markets ahead. One question begged by this argument for the integrated design is the durability, efficiency and ultimate long-term survivability of the more "traditional" community health care delivery models, which, by design, are fragmented, internally competitive and less capital efficient. They also cannot exploit the leverage of teams, optimal access management or the pursuit of revenues made available in many forms. For those who wish to move from the traditional to the more integrated community health system designs (especially those who have not yet started the journey), the path requires: * Sufficient balance sheet capacity to fund the integration process-especially as the model requires physician practice acquisitions and electronic health record implementations * A well-prepared board13, 14 * A functional, durable and sustainable physician services enterprise design * A redesigned organizational and governance structure * Favorable internal financial incentives alignment design * Effective accountable physician leadership * Awareness that the system is not solely a funding strategy for acquired physicians, rather a fully -.. committed clinical and business model, one in which patient-centered integrated care is the core service (and not acute care hospital-based services) A willingness to create and exploit the implied and inherent potential of an integrated design and unified brand Last, it's important to remember that an integrated health system is a tool that creates a "new potential" (a physics metaphor reference, one last time). The design doesn't operate itself. Application of the management principles

  7. IVHM Framework for Intelligent Integration for Vehicle Health Management

    Science.gov (United States)

    Paris, Deidre; Trevino, Luis C.; Watson, Michael D.

    2005-01-01

    Integrated Vehicle Health Management (IVHM) systems for aerospace vehicles, is the process of assessing, preserving, and restoring system functionality across flight and techniques with sensor and communication technologies for spacecraft that can generate responses through detection, diagnosis, reasoning, and adapt to system faults in support of Integrated Intelligent Vehicle Management (IIVM). These real-time responses allow the IIVM to modify the affected vehicle subsystem(s) prior to a catastrophic event. Furthermore, this framework integrates technologies which can provide a continuous, intelligent, and adaptive health state of a vehicle and use this information to improve safety and reduce costs of operations. Recent investments in avionics, health management, and controls have been directed towards IIVM. As this concept has matured, it has become clear that IIVM requires the same sensors and processing capabilities as the real-time avionics functions to support diagnosis of subsystem problems. New sensors have been proposed, in addition to augment the avionics sensors to support better system monitoring and diagnostics. As the designs have been considered, a synergy has been realized where the real-time avionics can utilize sensors proposed for diagnostics and prognostics to make better real-time decisions in response to detected failures. IIVM provides for a single system allowing modularity of functions and hardware across the vehicle. The framework that supports IIVM consists of 11 major on-board functions necessary to fully manage a space vehicle maintaining crew safety and mission objectives. These systems include the following: Guidance and Navigation; Communications and Tracking; Vehicle Monitoring; Information Transport and Integration; Vehicle Diagnostics; Vehicle Prognostics; Vehicle Mission Planning, Automated Repair and Replacement; Vehicle Control; Human Computer Interface; and Onboard Verification and Validation. Furthermore, the presented

  8. Development of an integrated database management system to evaluate integrity of flawed components of nuclear power plant

    International Nuclear Information System (INIS)

    Mun, H. L.; Choi, S. N.; Jang, K. S.; Hong, S. Y.; Choi, J. B.; Kim, Y. J.

    2001-01-01

    The object of this paper is to develop an NPP-IDBMS(Integrated DataBase Management System for Nuclear Power Plants) for evaluating the integrity of components of nuclear power plant using relational data model. This paper describes the relational data model, structure and development strategy for the proposed NPP-IDBMS. The NPP-IDBMS consists of database, database management system and interface part. The database part consists of plant, shape, operating condition, material properties and stress database, which are required for the integrity evaluation of each component in nuclear power plants. For the development of stress database, an extensive finite element analysis was performed for various components considering operational transients. The developed NPP-IDBMS will provide efficient and accurate way to evaluate the integrity of flawed components

  9. Integrating In-Situ and Ex-Situ Data Management Processes for Biodiversity Conservation

    Directory of Open Access Journals (Sweden)

    Karin R. Schwartz

    2017-10-01

    Full Text Available There is an increasing need for a “one plan approach” for conservation strategies that integrate in-situ and ex-situ management processes. Zoological institutions contribute directly to threatened species conservation through paradigms, such as reintroduction, head-starting, supplementation, or rescue/rehabilitation/release. This in-situ/ex-situ integration necessitates collaboration at all levels of conservation action including planning, implementation, monitoring and assessment to drive adaptive management processes. Each component is dependent on the availability and accuracy of data for evidence to facilitate evaluation and adaptive management processes. The Zoological Information Management System (ZIMS, managed by Species360, is a centralized web-based information system used in zoological institutions worldwide to pool life history, behavior and health data and facilitate animal husbandry, health, and breeding management processes. Currently used for few integrated conservation programs, ZIMS is an innovative tool that offers a new opportunity to link data management processes for animals that spend a part of their lives under human care and part in their natural environment and has great potential for use in managed wild populations.

  10. The Design of Integrated Logistics Management System of an Industrial Company

    Directory of Open Access Journals (Sweden)

    Hart Martin

    2017-01-01

    Full Text Available In the contemporary global business markets environment, when the business markets are getting more and more commercial, there are growing demand for effective management of material flows. The effectivity and effectiveness of planning, management and control the material flows across an industrial company and its distribution networks, represents one of the main pillar regarding the high level of competitive advantage within the frame of supply chains. Thus, the company information management system design should have also included a module of integrated logistics management system to ensure required level of material flow management effectivity and effectiveness. The article deals with brief description of the issues on company management, company information management systems and logistics management. Further it’s stated the methodology to created integrated logistics management system, which is containing the methodics to design logistics management sub-systems of purchasing, manufacturing, distribution and reverse material flows. The essential methodics of the stated methodology is the methodics to create independent demand forecasting sub-system.

  11. Integrated probabilistic assessment for DHC initiation, growth and leak-before-break of PHWR pressure tubes

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Young-Jin [Power Engineering Research Institute, KEPCO Engineering and Construction, 188 Gumi-dong, Bundang-gu, Seongnam-si, Gyeonggi-do 463-870 (Korea, Republic of); Chang, Yoon-Suk, E-mail: yschang@khu.ac.kr [Department of Nuclear Engineering, Kyung Hee University, 1732 Deogyeong-daero, Giheung-gu, Yongin-si, Gyeonggi-do 446-701 (Korea, Republic of)

    2014-08-15

    Highlights: • We develop an integrated approach for probabilistic assessment of PHWR pressure tube. • We examine probabilities of DHC initiation, growth, penetration and LBB failure. • The proposed approach is helpful to calculate rupture probabilities in reactor flaws even in the case of very low rupture probability. - Abstract: A few hundred zirconium alloy pressure tubes in a pressurized heavy water reactor (PHWR) serve as the nuclear fuel channel, as well as the reactor coolant pressure boundary. The pressure tubes are inspected periodically and a fitness-for-service assessment (FFSA) must be conducted if any flaw is detected in the inspection. A Canadian standard provides FFSA procedures of PHWR pressure tubes, which include probabilistic assessment for flaws considering delayed hydride cracking (DHC) and leak-before-break (LBB). In the present study, an integrated approach with detailed stepwise calculation procedures and integration methodology for probabilistic assessment of pressure tube was developed. In the first step of this approach, a probability of the DHC initiation, growth and penetration for single initial flaw is calculated. In the next step, a probability of LBB failure, which means tube rupture, for single through-wall crack (TWC) is calculated. Finally, a rupture probability for all initial flaws in a reactor can be calculated using the penetration probability for single flaw and the LBB failure probability for single TWC, as well as the predicted total number of initial flaw in the reactor.

  12. Integrated probabilistic assessment for DHC initiation, growth and leak-before-break of PHWR pressure tubes

    International Nuclear Information System (INIS)

    Oh, Young-Jin; Chang, Yoon-Suk

    2014-01-01

    Highlights: • We develop an integrated approach for probabilistic assessment of PHWR pressure tube. • We examine probabilities of DHC initiation, growth, penetration and LBB failure. • The proposed approach is helpful to calculate rupture probabilities in reactor flaws even in the case of very low rupture probability. - Abstract: A few hundred zirconium alloy pressure tubes in a pressurized heavy water reactor (PHWR) serve as the nuclear fuel channel, as well as the reactor coolant pressure boundary. The pressure tubes are inspected periodically and a fitness-for-service assessment (FFSA) must be conducted if any flaw is detected in the inspection. A Canadian standard provides FFSA procedures of PHWR pressure tubes, which include probabilistic assessment for flaws considering delayed hydride cracking (DHC) and leak-before-break (LBB). In the present study, an integrated approach with detailed stepwise calculation procedures and integration methodology for probabilistic assessment of pressure tube was developed. In the first step of this approach, a probability of the DHC initiation, growth and penetration for single initial flaw is calculated. In the next step, a probability of LBB failure, which means tube rupture, for single through-wall crack (TWC) is calculated. Finally, a rupture probability for all initial flaws in a reactor can be calculated using the penetration probability for single flaw and the LBB failure probability for single TWC, as well as the predicted total number of initial flaw in the reactor

  13. Multiobjective decision-making in integrated water management

    NARCIS (Netherlands)

    Wind, H.G.; Pouwels, I.H.M.; Pouwels, I.H.M.; Witter, V.J.

    1995-01-01

    Traditionally, decision-making by water authorities in the Netherlands is largely based on intuition. Their tasks were, after all, relatively few and straight-forward. The growing number of tasks, together with the new integrated approach on water management issues, however, induces water

  14. Systems engineering applied to integrated safety management for high consequence facilities

    International Nuclear Information System (INIS)

    Barter, R; Morais, B.

    1998-01-01

    Integrated Safety Management is a concept that is being actively promoted by the U.S. Department of Energy as a means of assuring safe operation of its facilities. The concept involves the integration of safety precepts into work planning rather than adjusting for safe operations after defining the work activity. The system engineering techniques used to design an integrated safety management system for a high consequence research facility are described. An example is given to show how the concepts evolved with the system design

  15. Integrated management for aging of Atucha Nuclear Power Plant

    International Nuclear Information System (INIS)

    Ranalli, J.M.; Marchena, M.H.; Sabransky, M.; Fonseca, M.; Santich, J.; Pedernera, P.

    2012-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina.. With the start-up of Atucha II and aiming to integrate the Ageing Management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) created an Ageing Management Department to cope with all ageing issues of both Atucha I and II. In this project both organization has formed a joint working group. The role of CNEA is providing technical support to the plant in the development of procedures a methodological framework for the Ageing Management Program of Atucha NPP. The main documents that have being issued so far are: . An Ageing Management Manual, including standard definition of Materials, Ageing Related Degradation Mechanisms, Operation Environments customized for Atucha NPP. . Walk down procedures and checklists aimed to systematize data collection during outages. . Procedures for performing Ageing Management Reviews and Maintenance Reviews for passive and active components. . Condition Assessments of several safety related systems. . Condition assessment of electrical components. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented (author)

  16. How Agile Methods Conquers General Project Management - The Project Half Double Initiative

    DEFF Research Database (Denmark)

    Tordrup Heeager, Lise; Svejvig, Per; Schlichter, Bjarne Rerup

    2016-01-01

    Increased complexity in projects has forced new project management initiatives. In software development several agile methods have emerged and methods such as Scrum are today highly implemented in practice. General project management practice has been inspired by agile software development...

  17. Farmers’ Technical Knowledge about Integrated Pest Management (IPM in Olive Production

    Directory of Open Access Journals (Sweden)

    Mohammad S. Allahyari

    2017-12-01

    Full Text Available While Integrated Pest Management (IPM is a sustainable approach of pest control, contributing to reduced use of pesticides and risks on human health and the environment, farmers have shown limited interest in practicing this method. The present study explored the levels of technical knowledge about integrated management of the olive fly (Bactrocera oleae among olive growers in Roudbar County of Iran and factors underpinning olive farmers’ technical knowledge of integrated management. Data were collected in a survey of olive farmers, on the basis of a structured questionnaire. Almost half of the farmers (48.4% had good to excellent levels of technical knowledge of integrated management, while almost a third of the farmers (35.4% had a moderate knowledge level. However, a noticeable portion of the farmers (15.9% had poor knowledge of integrated management. Moreover, most farmers showed average knowledge of the adverse effects of pesticides on human health. While most farmers showed good levels of social participation, cooperation with institutes, and participation in extension activities, they showed low levels of community involvement (involvement in a group of people that have and share common interests with each other. Olive imports and the lack of a common action for olive fly control were perceived as the main barriers of IPM adoption among most farmers. Regression analysis revealed that increased community involvement, large area under olive farming, participation in education activities, and high farming experience promoted farmers’ technical knowledge of integrated olive fly control. Strengthening growers’ technical knowledge of IPM through community involvement and extension services among inexperienced small-scale olive farmers is recommended for reducing possible unnecessary insecticide sprays in olive production.

  18. The Assured Storage Integrated Management System: What is it and what will it cost?

    International Nuclear Information System (INIS)

    Kerr, T.A.; Newberry, W.F.

    1996-01-01

    The Assured Storage Integrated Management System for low-level radioactive waste as an alternative to traditional disposal is attracting favorable attention from many states, regulators, processors, and low-level radioactive waste generators. open-quotes Assured storageclose quotes is defined as a management system for safely isolating waste, while preserving options for its long-term management, through: robust, accessible facilities; planned preventive maintenance; and sureties adequate to address contingencies or implement future alternatives. Following introduction of the concept in RADWASTE Magazine, the Connecticut Hazardous Waste Management Service (among several others) requested a briefing on the idea. The Connecticut Hazardous Waste Management Service then requested that the National Low-Level Waste Management Program at the Idaho National Engineering Laboratory evaluate the life cycle costs of the Assured Storage Integrated Management System versus traditional disposal. Building on some of that work, this paper discusses the concept of an Assured Storage Integrated Management System for low-level radioactive waste as well as examines cost elements of the Assured Storage Integrated Management System in comparison to traditional disposal facilities. Further analyses conducted for the Connecticut study will more clearly define and quantify potential differences in life-cycle costs between the Assured Storage Integrated Management System and traditional disposal

  19. Ontology modeling in physical asset integrity management

    CERN Document Server

    Yacout, Soumaya

    2015-01-01

    This book presents cutting-edge applications of, and up-to-date research on, ontology engineering techniques in the physical asset integrity domain. Though a survey of state-of-the-art theory and methods on ontology engineering, the authors emphasize essential topics including data integration modeling, knowledge representation, and semantic interpretation. The book also reflects novel topics dealing with the advanced problems of physical asset integrity applications such as heterogeneity, data inconsistency, and interoperability existing in design and utilization. With a distinctive focus on applications relevant in heavy industry, Ontology Modeling in Physical Asset Integrity Management is ideal for practicing industrial and mechanical engineers working in the field, as well as researchers and graduate concerned with ontology engineering in physical systems life cycles. This book also: Introduces practicing engineers, research scientists, and graduate students to ontology engineering as a modeling techniqu...

  20. Integration of structural health monitoring and asset management.

    Science.gov (United States)

    2012-08-01

    This project investigated the feasibility and potential benefits of the integration of infrastructure monitoring systems into enterprise-scale transportation management systems. An infrastructure monitoring system designed for bridges was implemented...

  1. promoting integrated water resources management in south west

    African Journals Online (AJOL)

    eobe

    1, 2 SOUTH WEST REGIONAL CENTRE FOR NATIONAL WATER RESOURCES CAPACITY BUILDING NETWORK,. FEDERAL UNIVERSITY OF ... that an integrated approach to water resource development and management offers the best ...

  2. Integrating environmental monitoring with cumulative effects management and decision making.

    Science.gov (United States)

    Cronmiller, Joshua G; Noble, Bram F

    2018-05-01

    Cumulative effects (CE) monitoring is foundational to emerging regional and watershed CE management frameworks, yet monitoring is often poorly integrated with CE management and decision-making processes. The challenges are largely institutional and organizational, more so than scientific or technical. Calls for improved integration of monitoring with CE management and decision making are not new, but there has been limited research on how best to integrate environmental monitoring programs to ensure credible CE science and to deliver results that respond to the more immediate questions and needs of regulatory decision makers. This paper examines options for the integration of environmental monitoring with CE frameworks. Based on semistructured interviews with practitioners, regulators, and other experts in the Lower Athabasca, Alberta, Canada, 3 approaches to monitoring system design are presented. First, a distributed monitoring system, reflecting the current approach in the Lower Athabasca, where monitoring is delegated to different external programs and organizations; second, a 1-window system in which monitoring is undertaken by a single, in-house agency for the purpose of informing management and regulatory decision making; third, an independent system driven primarily by CE science and understanding causal relationships, with knowledge adopted for decision support where relevant to specific management questions. The strengths and limitations of each approach are presented. A hybrid approach may be optimal-an independent, nongovernment, 1-window model for CE science, monitoring, and information delivery-capitalizing on the strengths of distributed, 1-window, and independent monitoring systems while mitigating their weaknesses. If governments are committed to solving CE problems, they must invest in the long-term science needed to do so; at the same time, if science-based monitoring programs are to be sustainable over the long term, they must be responsive to

  3. The role local initiatives in community based disaster risk management in Kemijen, Semarang City

    Science.gov (United States)

    Fauzie, W. Z.; Sariffudin, S.

    2017-06-01

    Community-based disaster risk reduction is one of the homegrown initiatives efforts and community empowerment oriented in disaster management. This approach is very important because no one can understand the conditions in a region better than the local communities. Therefore, the implementation of CBDRM always emphasize local initiatives in decision making. The existence of local initiative is necessary specially to anticipate the impact of climate change which is increasingly affecting towns in coastal areas, including settlements in Semarang. Kemijen Urban Village is one of the informal settlements in Semarang, which has the highest intensity of flood that is 12 times during 5 years (2011-2015). The research question is how the level of local initiatives in flood disaster management in Kemijen, Semarang? This study aims to assess the level of local initiatives in Kemijen as the community adaptive capacity of flood prevention in pre-disaster, emergency response, and post-disaster. Local initiatives assessed on water supply, sanitation, food, shelter, health, drainage maintenance and waste management. This study shows the level of local initiatives in pre-disaster and post-disaster is almost same and bigger than the response phase. Scoring results showed that pre-disaster is 35.002, 27.9577 for emergency response, and post-disaster is 34.9862 with each category that is independent, empowered, and independent. This study also shows that local initiatives in Kemijen largely formed by individual initiative and only a few were formed by a collective initiative.

  4. On the initial condition problem of the time domain PMCHWT surface integral equation

    KAUST Repository

    Uysal, Ismail Enes

    2017-05-13

    Non-physical, linearly increasing and constant current components are induced in marching on-in-time solution of time domain surface integral equations when initial conditions on time derivatives of (unknown) equivalent currents are not enforced properly. This problem can be remedied by solving the time integral of the surface integral for auxiliary currents that are defined to be the time derivatives of the equivalent currents. Then the equivalent currents are obtained by numerically differentiating the auxiliary ones. In this work, this approach is applied to the marching on-in-time solution of the time domain Poggio-Miller-Chan-Harrington-Wu-Tsai surface integral equation enforced on dispersive/plasmonic scatterers. Accuracy of the proposed method is demonstrated by a numerical example.

  5. Knowledge Management and World Class Manufacturing: an initial approach based on a literature review

    Directory of Open Access Journals (Sweden)

    Rafael de Carvalho Mendes

    Full Text Available ABSTRACT This paper presents the partial results of an ongoing research on the proposal of a methodology for the integration between Knowledge Management (KM and World Class Manufacturing (WCM. The initial investigation of theoretical and conceptual nature aimed at developing a comprehensive and current vision on KM, WCM, and how (or "whether" these constructs relate to one another. The primary sources for the literature review were Web of Science, Scopus, Emerald, Ebsco, SciELO and Spell, and the time frame was 2000 to 2016. The analysis of the selected papers showed that, although the initial WCM model evolved into a "new WCM" in the 2000s, the literature is still focused on the broad conceptual aspects and basic methods and tools, such as Total Quality Process, Total Productive Maintenance and Just-in-Time, conceived in the Toyota Production System, which shows the need for more studies focused on the current scenario of companies associated with the "new WCM" and its Methods and Tools. Only one article explicitly addressing the interaction between KM theories with WCM was found in the databases surveyed, thus reinforcing the lack of theoretical approximation of these constructs.

  6. Integrated model for line balancing with workstation inventory management

    OpenAIRE

    Dilip Roy; Debdip khan

    2010-01-01

    In this paper, we address the optimization of an integrated line balancing process with workstation inventory management. While doing so, we have studied the interconnection between line balancing and its conversion process. Almost each and every moderate to large manufacturing industry depends on a long and integrated supply chain, consisting of inbound logistic, conversion process and outbound logistic. In this sense an approach addresses a very general problem of integrated line balancing....

  7. Integration of the informal sector into municipal solid waste management in the Philippines - What does it need?

    Energy Technology Data Exchange (ETDEWEB)

    Paul, Johannes G., E-mail: jp.aht.p3@gmail.com [GIZ-AHT Project Office SWM4LGUs, c/o DENR, Iloilo City (Philippines); Arce-Jaque, Joan [GIZ-AHT Project Office SWM4LGUs, c/o DENR, Iloilo City (Philippines); Ravena, Neil; Villamor, Salome P. [General Service Office, City Government, Iloilo City (Philippines)

    2012-11-15

    The integration of the informal sector into municipal solid waste management is a challenge many developing countries face. In Iloilo City, Philippines around 220 tons of municipal solid waste are collected every day and disposed at a 10 ha large dumpsite. In order to improve the local waste management system the Local Government decided to develop a new Waste Management Center with integrated landfill. However, the proposed area is adjacent to the presently used dumpsite where more than 300 waste pickers dwell and depend on waste picking as their source of livelihood. The Local Government recognized the hidden threat imposed by the waste picker's presence for this development project and proposed various measures to integrate the informal sector into the municipal solid waste management (MSWM) program. As a key intervention a Waste Workers Association, called USWAG Calahunan Livelihood Association Inc. (UCLA) was initiated and registered as a formal business enterprise in May 2009. Up to date, UCLA counts 240 members who commit to follow certain rules and to work within a team that jointly recovers wasted materials. As a cooperative they are empowered to explore new livelihood options such as the recovery of Alternative Fuels for commercial (cement industry) and household use, production of compost and making of handicrafts out of used packages. These activities do not only provide alternative livelihood for them but also lessen the generation of leachate and Greenhouse Gases (GHG) emissions from waste disposal, whereby the life time of the proposed new sanitary landfill can be extended likewise.

  8. Semantic Representation and Scale-Up of Integrated Air Traffic Management Data

    Science.gov (United States)

    Keller, Richard M.; Ranjan, Shubha; Wei, Mie; Eshow, Michelle

    2016-01-01

    Each day, the global air transportation industry generates a vast amount of heterogeneous data from air carriers, air traffic control providers, and secondary aviation entities handling baggage, ticketing, catering, fuel delivery, and other services. Generally, these data are stored in isolated data systems, separated from each other by significant political, regulatory, economic, and technological divides. These realities aside, integrating aviation data into a single, queryable, big data store could enable insights leading to major efficiency, safety, and cost advantages. In this paper, we describe an implemented system for combining heterogeneous air traffic management data using semantic integration techniques. The system transforms data from its original disparate source formats into a unified semantic representation within an ontology-based triple store. Our initial prototype stores only a small sliver of air traffic data covering one day of operations at a major airport. The paper also describes our analysis of difficulties ahead as we prepare to scale up data storage to accommodate successively larger quantities of data -- eventually covering all US commercial domestic flights over an extended multi-year timeframe. We review several approaches to mitigating scale-up related query performance concerns.

  9. An integrated management system to improve the performance of nuclear installations

    Energy Technology Data Exchange (ETDEWEB)

    Beckmerhagen, I.A.; Berg, H.P. [Bundesamt fur Strahlenschutz, Salzgitter (Germany)

    2001-07-01

    A integrated management system encompasses all management and assessment activities. The integration of DM, QM, safety management and occupational health into an integrated management system is shown for structures, systems and components of waste repositories because they have to fulfill reliability requirements derived from comprehensive safety assessments, and these structures, systems and components (such as transport vehicles and stacker trucks for the underground emplacement activities) are especially manufactured for this purpose and are not series products. QM institutes a QM system which ensures that there are clearly defined and auditable procedures. The requirements are written down in specifications or operation manuals and/or maintenance manuals. The QM system provides assurance that the installed structures, systems or components meet and continue to meet the prescribed goals with the help of DM and that safety management and occupational health specified requirements are fulfilled. DM focuses on the use of engineering analyses, assessments and methods to improve the design, specification, construction, dependability and operation of important systems, structures and components. (author)

  10. An integrated management system to improve the performance of nuclear installations

    International Nuclear Information System (INIS)

    Beckmerhagen, I.A.; Berg, H.P.

    2001-01-01

    A integrated management system encompasses all management and assessment activities. The integration of DM, QM, safety management and occupational health into an integrated management system is shown for structures, systems and components of waste repositories because they have to fulfill reliability requirements derived from comprehensive safety assessments, and these structures, systems and components (such as transport vehicles and stacker trucks for the underground emplacement activities) are especially manufactured for this purpose and are not series products. QM institutes a QM system which ensures that there are clearly defined and auditable procedures. The requirements are written down in specifications or operation manuals and/or maintenance manuals. The QM system provides assurance that the installed structures, systems or components meet and continue to meet the prescribed goals with the help of DM and that safety management and occupational health specified requirements are fulfilled. DM focuses on the use of engineering analyses, assessments and methods to improve the design, specification, construction, dependability and operation of important systems, structures and components. (author)

  11. Regional Integrated Silvopastoral Approaches to Ecosystem Management Project

    OpenAIRE

    CIPAV (Centre For Research on Sustainable Agricultural Production Systems); CATIE (Centro Agronomico Tropical de Investigacion y Ensenanza); NITLAPAN

    2007-01-01

    Metadata only record The Regional Integrated Silvopastoral Approaches to Ecosystem Management Project introduces the payment for environmental services approach to silvopastoral farmers in Colombia, Costa Rica, and Nicaragua. The objectives of the project are to "demonstrate and measure a) the effects the introduction of payment incentives for environmental services to farmers on their adoption of integrated silvopastoral farming systems in degraded pasture lands; and b) the resulting impr...

  12. Radioactive Waste Management - Community Policy and Research Initiatives. The sixth international conference on the management and disposal of radioactive waste - Euradwaste '04

    Energy Technology Data Exchange (ETDEWEB)

    Forsstroem, Hans [Research Directorate Energy, Nuclear Fission and Radiation Protection, European Commission, MO-75 5/37, 200 avenue de la Loi, B-1049 Brussels (Belgium); Ruiz, P Fernandez [DG Research, Energy, Consejo de Seguridad Nuclear, CSN, C/ Justo Dorado, 11, E-28040 Madrid (Spain)

    2004-07-01

    The sixth international conference on the management and disposal of radioactive waste organized be European Commission, held on 29-31 March 2004 in Luxembourg aimed to cover the following objectives: - To present EC policy in waste management, in particular the proposed 'Directive on the Management of Spent Nuclear Fuel and Radioactive Waste' and to discuss relating issues such as the effect on national programmes, site selection, EU added value, the case for EU safety standards, and various socio-political aspects; - To highlight the main results of the Fifth Framework Programme (FP5) of EURATOM for 'Nuclear Energy, Fission Research and Training Activities' in the field of waste in spent fuel management and disposal, and partitioning and transmutation; - To present examples of activities under FP5 and to discuss further research European integration through FP6. The program was divided into two main groups: 1. 'Community Policy and Socio-Political Aspects' which included sessions on community policy initiatives, disposal option, common safety standards and public involvement and acceptance; 2. 'Community Research Activities - FP5' which included sessions on partitioning and transmutation, geological disposal and research networking. There were 29 oral presentations and 36 poster presentations which, for the latter, allowed detailed presentations of the results of the EU-funded research projects. The conference was attended by some 240 participants from 27 countries.

  13. Technology and diabetes self-management: An integrative review

    OpenAIRE

    Hunt, Caralise W

    2015-01-01

    Technology can be used to supplement healthcare provider diabetes care by providing both educational and motivational support. Education can be provided using technology allowing patients to learn new practices and routines related to diabetes management. Technology can support daily diabetes self-management activities including blood glucose monitoring, exercising, healthy eating, taking medication, monitoring for complications, and problem-solving. This article describes an integrative revi...

  14. Pain management: a review of organisation models with integrated processes for the management of pain in adult cancer patients.

    Science.gov (United States)

    Brink-Huis, Anita; van Achterberg, Theo; Schoonhoven, Lisette

    2008-08-01

    This paper reports a review of the literature conducted to identify organisation models in cancer pain management that contain integrated care processes and describe their effectiveness. Pain is experienced by 30-50% of cancer patients receiving treatment and by 70-90% of those with advanced disease. Efforts to improve pain management have been made through the development and dissemination of clinical guidelines. Early improvements in pain management were focussed on just one or two single processes such as pain assessment and patient education. Little is known about organisational models with multiple integrated processes throughout the course of the disease trajectory and concerning all stages of the care process. Systematic review. The review involved a systematic search of the literature, published between 1986-2006. Subject-specific keywords used to describe patients, disease, pain management interventions and integrated care processes, relevant for this review were selected using the thesaurus of the databases. Institutional models, clinical pathways and consultation services are three alternative models for the integration of care processes in cancer pain management. A clinical pathway is a comprehensive institutionalisation model, whereas a pain consultation service is a 'stand-alone' model that can be integrated in a clinical pathway. Positive patient and process outcomes have been described for all three models, although the level of evidence is generally low. Evaluation of the quality of pain management must involve standardised measurements of both patient and process outcomes. We recommend the development of policies for referrals to a pain consultation service. These policies can be integrated within a clinical pathway. To evaluate the effectiveness of pain management models standardised outcome measures are needed.

  15. Report of study group 4.3 ''pipeline integrity management and safety''

    Energy Technology Data Exchange (ETDEWEB)

    Clavel, P.

    2000-07-01

    This report highlights the Pipeline integrity Management methods being implemented by gas companies. These aim at maintaining the current high safety level, prevent major hazards, ensure the integrity of the pipeline and protect people and environment in the vicinity of the pipeline in the most cost effective way. It should be noticed that Pipeline Integrity Management aspects, technical and organisational, are included in the more general framework of the Safety Management System. Currently, more and more gas companies implement such a system on the basis of standards like ISO 9000 and so on. In this way, the report shows how practices of Pipeline Integrity Management are continually developing in order to adapt to their environment, and to improve performance. Past experience and imminent developments show that Pipeline Integrity Management is a flexible and efficient approach to improve safety in the long term. Consequently, Pipeline Integrity Management Systems are, under the control of authorities, the best alternative to additional safety regulations. Within the context of deregulation of the European markets and globalization Pipeline Integrity Management appears to be a tool to promote the gas industry in the eyes of the authorities, the market regulators and the customers (industrialists,...). (author)

  16. Setting global research priorities for integrated community case management (iCCM: Results from a CHNRI (Child Health and Nutrition Research Initiative exercise

    Directory of Open Access Journals (Sweden)

    Kerri Wazny

    2014-11-01

    Full Text Available Aims: to systematically identify global research gaps and resource priorities for integrated community case management (iCCM. Methods: an iCCM Child Health and Nutrition Research Initiative (CHNRI Advisory Group, in collaboration with the Community Case Management Operational Research Group (CCM ORG identified experts to participate in a CHNRI research priority setting exercise. These experts generated and systematically ranked research questions for iCCM. Research questions were ranked using a “Research Priority Score” (RPS and the “Average Expert Agreement” (AEA was calculated for every question. Our groups of experts were comprised of both individuals working in Ministries of Health or Non Governmental Organizations (NGOs in low– and middle–income countries (LMICs and individuals working in high–income countries (HICs in academia or NGO headquarters. A Spearman's Rho was calculated to determine the correlation between the two groups' research questions' ranks. Results: The overall RPS ranged from 64.58 to 89.31, with a median score of 81.43. AEA scores ranged from 0.54 to 0.86. Research questions involving increasing the uptake of iCCM services, research questions concerning the motivation, retention, training and supervision of Community Health Workers (CHWs and concerning adding additional responsibilities including counselling for infant and young child feeding (IYCF and treatment of severe acute malnutrition (SAM ranked highly. There was weak to moderate, statistically significant, correlation between scores by representatives of high–income countries and those working in–country or regionally (Spearman's ρ = 0.35034, P < 0.01. Conclusions: Operational research to determine optimal training, supervision and modes of motivation and retention for the CHW is vital for improving iCCM, globally, as is research to motivate caregivers to take advantage of iCCM services. Experts working in–country or regionally in

  17. The role of bacillus-based biological control agents in integrated pest management systems: plant diseases.

    Science.gov (United States)

    Jacobsen, B J; Zidack, N K; Larson, B J

    2004-11-01

    ABSTRACT Bacillus-based biological control agents (BCAs) have great potential in integrated pest management (IPM) systems; however, relatively little work has been published on integration with other IPM management tools. Unfortunately, most research has focused on BCAs as alternatives to synthetic chemical fungicides or bactericides and not as part of an integrated management system. IPM has had many definitions and this review will use the national coalition for IPM definition: "A sustainable approach to managing pests by combining biological, cultural, physical and chemical tools in a way that minimizes economic, health and environmental risks." This review will examine the integrated use of Bacillus-based BCAs with disease management tools, including resistant cultivars, fungicides or bactericides, or other BCAs. This integration is important because the consistency and degree of disease control by Bacillus-based BCAs is rarely equal to the control afforded by the best fungicides or bactericides. In theory, integration of several tools brings stability to disease management programs. Integration of BCAs with other disease management tools often provides broader crop adaptation and both more efficacious and consistent levels of disease control. This review will also discuss the use of Bacillus-based BCAs in fungicide resistance management. Work with Bacillus thuringiensis and insect pest management is the exception to the relative paucity of reports but will not be the focus of this review.

  18. In-flight Integrated Mission Management System (I-LIMMS)

    National Research Council Canada - National Science Library

    Emmitt, George D; Greco, Steven; Wood, Sidney

    2006-01-01

    The goal of this Phase I SBIR effort was to determine the feasibility and preliminary design of I-LIMMS, an In-flight Lidar Integrated Mission Management System for the processing and visualization...

  19. Pipeline integrity management: integration of geotechnical and mechanical assessment to control potential risks due to external forces

    Energy Technology Data Exchange (ETDEWEB)

    Malpartida Moya, John E.; Sota, Giancarlo Massucco de la; Seri, Walter [Compania Operadora de Gas del Amazonas, Lima (Peru)

    2009-07-01

    Every pipeline integrity management system evaluates and controls various threats. On pipelines which have particular characteristics as it is the case of the Andean pipelines and pipelines crossing jungles, one of the main threats are the external forces. Even, this threat causes a greater number of failures than other threats like corrosion or the third part damage. Facing this situation, the pipeline integrity management system of TgP has achieved an important development in the use and suitable handling of the information provided by diverse techniques of pipeline mechanical inspection and geotechnical inspection of the right-of-way (ROW). This document presents our methodology, which interrelate information of the in-line inspection, information of geotechnical inspections of the ROW, instrumentation (Strain Gages), topographic monitoring, among others. All this information is supported in a Geographic Information System (GIS) which allows us to integrate the information. By means of the pipeline integrity management system we control potential risks due to external forces, we have been able to act before events become critical, with no occurrence of failures. This system allows us simultaneously to optimize efforts and preserve the mechanical integrity of our pipelines, not producing neither personal nor environmental nor economical affectation. (author)

  20. Integration of electronic document management system with other systems in a company

    OpenAIRE

    Pintar, Matej

    2016-01-01

    This master's thesis presents specific model of integration between electronic document management system and other systems in a medium-sized company in Slovenia. The introduction part of the thesis begins with theoretical basis of the research, which is the integration of computer systems. The introduction part is folowed by presentation of a concrete electronic document management system EBA DMS. Central part of the master's thesis presents different methods of integration of electronic doc...

  1. An integrated approach to preventing cardiovascular disease: community-based approaches, health system initiatives, and public health policy.

    Science.gov (United States)

    Karwalajtys, Tina; Kaczorowski, Janusz

    2010-01-01

    Cardiovascular disease (CVD) is largely the product of interactions among modifiable risk factors that are common in developed nations and increasingly of concern in developing countries. Hypertension is an important precursor to the development of CVD, and although detection and treatment rates have improved in recent years in some jurisdictions, effective strategies and policies supporting a shift in distribution of risk factors at the population level remain paramount. Challenges in managing cardiovascular health more effectively include factors at the patient, provider, and system level. Strategies to reduce hypertension and CVD should be population based, incorporate multilevel, multicomponent, and socioenvironmental approaches, and integrate community resources with public health and clinical care. There is an urgent need to improve monitoring and management of risk factors through community-wide, primary care-linked initiatives, increase the evidence base for community-based prevention strategies, further develop and evaluate promising program components, and develop new approaches to support healthy lifestyle behaviors in diverse age, socioeconomic, and ethnocultural groups. Policy and system changes are critical to reduce risk in populations, including legislation and public education to reduce dietary sodium and trans-fatty acids, food pricing policies, and changes to health care delivery systems to explicitly support prevention and management of CVD.

  2. Integrated waste management and the tool of life cycle inventory : a route to sustainable waste management

    Energy Technology Data Exchange (ETDEWEB)

    McDougall, F.R.; White, P.R. [Procter and Gamble Newcastle Technical Centre, Newcastle (United Kingdom). Corporate Sustainable Development

    2000-07-01

    An overall approach to municipal waste management which integrates sustainable development principles was discussed. The three elements of sustainability which have to be balanced are environmental effectiveness, economic affordability and social acceptability. An integrated waste management (IWM) system considers different treatment options and deals with the entire waste stream. A life cycle inventory (LCI) and life cycle assessment (LCA) is used to determine the environmental burdens associated with IWM systems. LCIs for waste management are currently available for use in Europe, the United States, Canada and elsewhere. LCI is being used by waste management companies to assess the environmental attributes of future contract tenders. The models are used as benchmarking tools to assess the current environmental profile of a waste management system. They are also a comparative planning and communication tool. The authors are currently looking into publishing, at a future date, the experience of users of this LCI environmental management tool. 12 refs., 3 figs.

  3. IDMT, Integrated Decommissioning Management Tools

    International Nuclear Information System (INIS)

    Alemberti, A.; Castagna, P.; Marsiletti, M.; Orlandi, S.; Perasso, L.; Susco, M.

    2005-01-01

    Nuclear Power Plant decommissioning requires a number of demolition activities related to civil works and systems as well as the construction of temporary facilities used for treatment and conditioning of the dismantled parts. The presence of a radiological, potentially hazardous, environment due to the specific configuration and history of the plant require a professional, expert and qualified approach approved by the national safety authority. Dismantling activities must be designed, planned and analysed in detail during an evaluation phase taking into account different scenarios generated by possible dismantling sequences and specific waste treatments to be implemented. The optimisation process of the activities becomes very challenging taking into account the requirement of the minimisation of the radiological impact on exposed workers and people during normal and accident conditions. While remote operated equipment, waste treatment and conditioning facilities may be designed taking into account this primary goal also a centralised management system and corresponding software tools have to be designed and operated in order to guarantee the fulfilment of the imposed limits as well as the traceability of wastes. Ansaldo Nuclear Division has been strongly involved in the development of a qualified and certified software environment to manage the most critical activities of a decommissioning project. The IDMT system (Integrated Decommissioning Management Tools) provide a set of stand alone user friendly applications able to work in an integrated configuration to guarantee waste identification, traceability during treatment and conditioning process as well as location and identification at the Final Repository site. Additionally, the system can be used to identify, analyse and compare different specific operating scenarios to be optimised in term of both economical and radiological considerations. The paper provides an overview of the different phases of

  4. Development of Integrated Evaluation System for Severe Accident Management

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Dong Ha; Kim, K. R.; Park, S. H.; Park, S. Y.; Park, J. H.; Song, Y. M.; Ahn, K. I.; Choi, Y

    2007-06-15

    The objective of the project is twofold. One is to develop a severe accident database (DB) for the Korean Standard Nuclear Power plant (OPR-1000) and a DB management system, and the other to develop a localized computer code, MIDAS (Multi-purpose IntegrateD Assessment code for Severe accidents). The MELCOR DB has been constructed for the typical representative sequences to support the previous MAAP DB in the previous phase. The MAAP DB has been updated using the recent version of MAAP 4.0.6. The DB management system, SARD, has been upgraded to manage the MELCOR DB in addition to the MAAP DB and the network environment has been constructed for many users to access the SARD simultaneously. The integrated MIDAS 1.0 has been validated after completion of package-wise validation. As the current version of MIDAS cannot simulate the anticipated transient without scram (ATWS) sequence, point-kinetics model has been implemented. Also the gap cooling phenomena after corium relocation into the RPV can be modeled by the user as an input parameter. In addition, the subsystems of the severe accident graphic simulator are complemented for the efficient severe accident management and the engine of the graphic simulator was replaced by the MIDAS instead of the MELCOR code. For the user's convenience, MIDAS input and output processors are upgraded by enhancing the interfacial programs.

  5. Development of Integrated Evaluation System for Severe Accident Management

    International Nuclear Information System (INIS)

    Kim, Dong Ha; Kim, K. R.; Park, S. H.; Park, S. Y.; Park, J. H.; Song, Y. M.; Ahn, K. I.; Choi, Y.

    2007-06-01

    The objective of the project is twofold. One is to develop a severe accident database (DB) for the Korean Standard Nuclear Power plant (OPR-1000) and a DB management system, and the other to develop a localized computer code, MIDAS (Multi-purpose IntegrateD Assessment code for Severe accidents). The MELCOR DB has been constructed for the typical representative sequences to support the previous MAAP DB in the previous phase. The MAAP DB has been updated using the recent version of MAAP 4.0.6. The DB management system, SARD, has been upgraded to manage the MELCOR DB in addition to the MAAP DB and the network environment has been constructed for many users to access the SARD simultaneously. The integrated MIDAS 1.0 has been validated after completion of package-wise validation. As the current version of MIDAS cannot simulate the anticipated transient without scram (ATWS) sequence, point-kinetics model has been implemented. Also the gap cooling phenomena after corium relocation into the RPV can be modeled by the user as an input parameter. In addition, the subsystems of the severe accident graphic simulator are complemented for the efficient severe accident management and the engine of the graphic simulator was replaced by the MIDAS instead of the MELCOR code. For the user's convenience, MIDAS input and output processors are upgraded by enhancing the interfacial programs

  6. Plant Reliability - an Integrated System for Management (PR-ISM)

    International Nuclear Information System (INIS)

    Aukeman, M.C.; Leininger, E.G.; Carr, P.

    1984-01-01

    The Toledo Edison Company, located in Toledo, Ohio, United States of America, recently implemented a comprehensive maintenance management information system for the Davis-Besse Nuclear Power Station. The system is called PR-ISM, meaning Plant Reliability - An Integrated System for Management. PR-ISM provides the tools needed by station management to effectively plan and control maintenance and other plant activities. The PR-ISM system as it exists today consists of four integrated computer applications: equipment data base maintenance, maintenance work order control, administrative activity tracking, and technical specification compliance. PR-ISM is designed as an integrated on-line system and incorporates strong human factors features. PR-ISM provides each responsible person information to do his job on a daily basis and to look ahead towards future events. It goes beyond 'after the fact' reporting. In this respect, PR-ISM is an 'interactive' control system which: captures work requirements and commitments as they are identified, provides accurate and up-to-date status immediately to those who need it, simplifies paperwork and reduces the associated time delays, provides the information base for work management and reliability analysis, and improves productivity by replacing clerical tasks and consolidating maintenance activities. The functional and technical features of PR-ISM, the experience of Toledo Edison during the first year of operation, and the factors which led to the success of the development project are highlighted. (author)

  7. Management initiatives to waste management decisions and environmental compliance in Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Jones, C.G.

    1988-01-01

    Martin Marietta Energy Systems, Inc. (MMES) has been the operating contractor for the nuclear production and research facilities at Oak Ridge, Tennessee and Paducah, Kentucky for about four and one-half years. Environmental compliance, regulatory interaction, and public confidence have been very significant issues during this time. This presentation will review the environmental situation in Oak Ridge in 1984 and will discuss management initiatives and experience in the development and implementation of effective environmental and waste management and health and safety programs committed to the protection of the environment, our workers and the public with an overall goal of full compliance with all current and anticipated regulations.

  8. Management initiatives to waste management decisions and environmental compliance in Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Jones, C.G.

    1988-01-01

    Martin Marietta Energy Systems, Inc. (MMES) has been the operating contractor for the nuclear production and research facilities at Oak Ridge, Tennessee and Paducah, Kentucky for about four and one-half years. Environmental compliance, regulatory interaction, and public confidence have been very significant issues during this time. This presentation will review the environmental situation in Oak Ridge in 1984 and will discuss management initiatives and experience in the development and implementation of effective environmental and waste management and health and safety programs committed to the protection of the environment, our workers and the public with an overall goal of full compliance with all current and anticipated regulations

  9. Effects of Integrated Health Management Intervention on Overweight and Obesity

    Directory of Open Access Journals (Sweden)

    Yiting Yang

    2017-01-01

    Full Text Available Overweight or obese adults aged 20~55 years and living in Beijing more than one year were randomly divided into different management groups. A one-year integrated health management intervention was applied in the health management groups. The physical indicators and metabolic indicators changed after one-year intervention on the overweight and obese adults. The annual reduction of the physical indicators was significant in all groups (p<0.05 except the weight loss in the placebo + general management group. The health management and the dietary supplement have statistically significant (p<0.001, p<0.001 effects on the annual reduction of these indicators and interactive effect between them was found on some of these indicators such as bodyweight, body mass index (BMI, body fat ratio (BFR, and hipline (p<0.05. The dietary supplement + health management group had the best annual reduction effects for the indicators among the groups. Integrated health management interventions including both dietary supplements intervention and health management could improve metabolic indicators in overweight and obese adults together with the physical indicators, suggesting the intermediated role of metabolic indictors in controlling obesity.

  10. A review of Integrated Management of Childhood Illness (IMCI ...

    African Journals Online (AJOL)

    The Integrated Management of Childhood Illness (IMCI) strategy is the primary child-care approach of choice for South Africa.1,2 IMCI training was introduced into ... by nurse practitioner and doctor alike in empowering them to make easy, evidence-based decisions in the management of sick children at first contact level.

  11. Integrated medication management in mHealth applications.

    Science.gov (United States)

    Ebner, Hubert; Modre-Osprian, Robert; Kastner, Peter; Schreier, Günter

    2014-01-01

    Continuous medication monitoring is essential for successful management of heart failure patients. Experiences with the recently established heart failure network HerzMobil Tirol show that medication monitoring limited to heart failure specific drugs could be insufficient, in particular for general practitioners. Additionally, some patients are confused about monitoring only part of their prescribed drugs. Sometimes medication will be changed without informing the responsible physician. As part of the upcoming Austrian electronic health record system ELGA, the eMedication system will collect prescription and dispensing data of drugs and these data will be accessible to authorized healthcare professionals on an inter-institutional level. Therefore, we propose two concepts on integrated medication management in mHealth applications that integrate ELGA eMedication and closed-loop mHealth-based telemonitoring. As a next step, we will implement these concepts and analyze--in a feasibility study--usability and practicability as well as legal aspects with respect to automatic data transfer from the ELGA eMedication service.

  12. Inspired moments - Possibilities beyond management through integral coaching

    Directory of Open Access Journals (Sweden)

    J. M.C. Everson

    2006-12-01

    Full Text Available Purpose: The primary purpose of this paper is to investigate whether an integral coaching intervention underway in a multinational, fast-moving consumer goods organisation can support the creation of an environment that encourages new ways of thinking and learning. This would be underpinned by increased self-understanding amongst leaders and managers. Such self-awareness is argued to lead to enhanced relationships within the workplace for both managers and their subordinates. Design/Methodology/Approach: A qualitative research methodology was adopted using the grounded theory approach to data analysis. Open coding was utilised to identify the emergent themes. These themes were in some cases self-reported and in other cases reported by middle management on the changes noted in the behaviour of senior management. The research findings are based on a high internal generalisability as the sample was drawn from a cross-functional sample. Because this survey was carried out within a single organisation, these results lack external generalisability. Findings: Firstly, the individual managers themselves express a greater sense of commitment, fairness and purpose both from each other and their line managers. Secondly, managers claim an improved ability to delegate, trust, communicate, and to operate effectively in team contexts resulting in improved team and cross-functional dynamics. The final impact observed was a shift in the cohesion, freedom and openness to diverse inputs in the organisation. Implications: This research highlights the key contribution that integral coaching can make in helping managers see beyond the limitations of traditional management towards the inspiring possibilities of powerful conversations and human connections in the workplace. Originality/Value: Whilst the results of this paper are specific only to the South African organisation under study, the research nevertheless shows a strong direct link between a coaching

  13. Application of the concept of integrated management system in the higher education institutions

    Directory of Open Access Journals (Sweden)

    Janovac Tatjana D.

    2015-01-01

    Full Text Available The concept of integrated management system in higher education is a new approach to organizing, and it has an aim to increase efficiency and coordinate all levels of management, decision making, and implementation of the teaching-learning process. Each level of management and decision-making is correlated with factors of internal and external environment. Integrated management system does not introduce new elements, but rationalize the use of the common elements, and thus provides a common synergy effect elements such as policy, planning, continuous improvement, teamwork and process approach. The possibility of applying the concept of integrated management system indicates that raising the quality of teaching-learning process, as well as recognition of liabilities to customers and stakeholders, is the basis for the development of the institution and achieving success. The use of this model is significant in terms of effectiveness, efficiency and sustainability of the business, and the education system. Implementation of integrated management system in the higher education sector represents a new paradigm and the mode of operation.

  14. Integrating Social Science and Ecosystem Management: A National Challenge

    Science.gov (United States)

    Cordell; H. Ken; Linda Caldwell

    1995-01-01

    These proceedings contain the contributed papers and panel presentations, as well as a paper presented at the National Workshop, of the Conference on Integrating Social Sciences and Ecosystem Management, which was held at Unicoi Lodge and Conference Center, Helen, GA, December 12-14, 1995. The overall purpose of this Conference was to improve understanding, integration...

  15. Integrated Waste Treatment Unit GFSI Risk Management Plan

    International Nuclear Information System (INIS)

    W. A. Owca

    2007-01-01

    This GFSI Risk Management Plan (RMP) describes the strategy for assessing and managing project risks for the Integrated Waste Treatment Unit (IWTU) that are specifically within the control and purview of the U.S. Department of Energy (DOE), and identifies the risks that formed the basis for the DOE contingency included in the performance baseline. DOE-held contingency is required to cover cost and schedule impacts of DOE activities. Prior to approval of the performance baseline (Critical Decision-2) project cost contingency was evaluated during a joint meeting of the Contractor Management Team and the Integrated Project Team for both contractor and DOE risks to schedule and cost. At that time, the contractor cost and schedule risk value was $41.3M and the DOE cost and schedule risk contingency value is $39.0M. The contractor cost and schedule risk value of $41.3M was retained in the performance baseline as the contractor's management reserve for risk contingency. The DOE cost and schedule risk value of $39.0M has been retained in the performance baseline as the DOE Contingency. The performance baseline for the project was approved in December 2006 (Garman 2006). The project will continue to manage to the performance baseline and change control thresholds identified in PLN-1963, ''Idaho Cleanup Project Sodium-Bearing Waste Treatment Project Execution Plan'' (PEP)

  16. IDMT an integrated system to manage decommissioning activities

    International Nuclear Information System (INIS)

    Marsiletti, M.; Mini, G.; Orlandi, S.

    2003-01-01

    In the frame of decommissioning activities Ansaldo has developed a set of Integrated Decommissioning Management Tools (IDMT) addressed to dismantling work as well as to management of the wastes. The tools MIRAD and DECOM arise from the project of dismantling Italian NPPs (e.g. Caorso) as described in this paper. MIRAD is an integration between a 3 D CAD Model of the NPP in as build configuration and a computerized database (presently an MS Access application) which stores the information related to the radiological measurements detected through in field monitoring associated to any item present in the plant. DECOM is an integration system between a 3 D CAD Model of the NPP (as minimum for the controlled zone) in as-built configuration and a computerized database (presently an MS Access application) which stores the information associated to primary and secondary wastes produced during operation, dismantling or treatment activities.The IDMT system is currently used in the following NPPs in Italy: Caorso NPP (Mark II GE Containment BWR), Garigliano NPP (Dual Cycle GE BWR) and Trino NPP (Westinghouse PWR Plant). (authors)

  17. GIS-HBIM INTEGRATION FOR THE MANAGEMENT OF HISTORICAL BUILDINGS

    Directory of Open Access Journals (Sweden)

    G. Vacca

    2018-05-01

    Full Text Available As is well known, Italy's very consistent buildings stock has become the major field for real estate investments and for the related projects and actions. It is a heritage that is often barely known and extremely complex, whose management has until now been addressed in a rather casual and uninformed manner, with unsatisfactory and sometimes disastrous outcomes. The situation is worse in the case of buildings of particular historical, artistic and architectural value so frequent within the heritage of our country. This paper shows the findings of an ongoing research which is aimed at structuring the cognitive process and assessing enhancement and re-functionalisation scenarios of our historical and architectural heritage through the use and integration of information systems such as BIM and the GIS. The work led to the development of a workflow able to integrate the contribution of the HBIM and GIS methodologies in the structuring and management of a wide range of digital data and information useful for its management. The research, focused on “La Gran Torre di Oristano, is aimed at creating the best conditions for an integrated and multidisciplinary strategy of requalification and refunctionalisation of historical and architectural heritage.

  18. Standardization process aligned to integrated management system: the case of TRANSPETRO's Oil Pipelines and Terminals Unit

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Maria Fatima Ludovico de [Pontificia Universidade Catolica do Rio de Janeiro (PUC-Rio/ITUC), Rio de Janeiro, RJ (Brazil). Instituto Tecnologico; Labrunie, Charles; Araujo, Dario Doria de [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil). Diretoria de Terminais e Oleodutos

    2009-07-01

    This paper presents the implementation by PETROBRAS Transporte S.A. - TRANSPETRO of its Oil Pipelines and Terminals Standardization Program (PRONOT) within the scope of the 'Integrated Management System' (IMS). This program, launched in 2006 in the regions where the company operates, aims at standardizing all of its oil pipeline and terminal operations. Its implementation was planned in two phases: the first, already successfully concluded, refers to pipeline operations, industrial maintenance and right-of-way activities management; and the second, initiated in 2009, encompasses cross-sectional activities including health, safety and environment (HSE); training and development of oil pipeline workforce; communication with stake holders; oil pipeline integrity; and engineering project requirements. The documental structures of TRANSPETRO IMS and PRONOT are described and represented graphically to emphasize the intentional alignment of the standardization process carried out by the Oil Pipelines and Terminals Unit to the corporate IMS, based upon national and international literature review and through practical research focusing on the best international practices. (author)

  19. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  20. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    International Nuclear Information System (INIS)

    MITCHELL, R.L.

    2000-01-01

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels