WorldWideScience

Sample records for integrated case management

  1. Integrating research with management: The case of Katavi National ...

    African Journals Online (AJOL)

    Integrating research with management: The case of Katavi National Park, Tanzania. ... national park: (i) reduced water flow caused by local damming of the Katuma River, ... to both management and policy makers for tackling these problems.

  2. Integrated Hydrographical Basin Management. Study Case - Crasna River Basin

    Science.gov (United States)

    Visescu, Mircea; Beilicci, Erika; Beilicci, Robert

    2017-10-01

    Hydrographical basins are important from hydrological, economic and ecological points of view. They receive and channel the runoff from rainfall and snowmelt which, when adequate managed, can provide fresh water necessary for water supply, irrigation, food industry, animal husbandry, hydrotechnical arrangements and recreation. Hydrographical basin planning and management follows the efficient use of available water resources in order to satisfy environmental, economic and social necessities and constraints. This can be facilitated by a decision support system that links hydrological, meteorological, engineering, water quality, agriculture, environmental, and other information in an integrated framework. In the last few decades different modelling tools for resolving problems regarding water quantity and quality were developed, respectively water resources management. Watershed models have been developed to the understanding of water cycle and pollution dynamics, and used to evaluate the impacts of hydrotechnical arrangements and land use management options on water quantity, quality, mitigation measures and possible global changes. Models have been used for planning monitoring network and to develop plans for intervention in case of hydrological disasters: floods, flash floods, drought and pollution. MIKE HYDRO Basin is a multi-purpose, map-centric decision support tool for integrated hydrographical basin analysis, planning and management. MIKE HYDRO Basin is designed for analyzing water sharing issues at international, national and local hydrographical basin level. MIKE HYDRO Basin uses a simplified mathematical representation of the hydrographical basin including the configuration of river and reservoir systems, catchment hydrology and existing and potential water user schemes with their various demands including a rigorous irrigation scheme module. This paper analyzes the importance and principles of integrated hydrographical basin management and develop a case

  3. Pro-ACT II: integrating utilization management, discharge planning, and nursing case management into the outcomes manager role.

    Science.gov (United States)

    Brett, J L; Bueno, M; Royal, N; Kendall-Sengin, K

    1997-02-01

    Building on redesign efforts that created case management, clinical care technicians, support service hosts, and pharmacy technician roles, this redesign focused on integrating case management, utilization management, and discharge planning functions into a new outcomes manager role. The authors describe the process of developing and implementing the new role and outline specific actions that eliminated redundancy and inefficiency. Results of the evaluation of the project are reviewed, including full-time equivalent and salary savings and employee and physician satisfaction improvements.

  4. Integrated management software files action in case of fire

    International Nuclear Information System (INIS)

    Moreno-Ventas Garcia, V.; Gimeno Serrano, F.

    2010-01-01

    The proper management of emergencies, is a challenge for which it is essential to be prepared. Integrated Software Performance Chips In case of fire and rapid access to information, make this application a must to effectively drive any emergency due to fire at any nuclear facility.

  5. Integrated management systems

    CERN Document Server

    Bugdol, Marek

    2015-01-01

    Examining the challenges of integrated management, this book explores the importance and potential benefits of using an integrated approach as a cross-functional concept of management. It covers not only standardized management systems (e.g. International Organization for Standardization), but also models of self-assessment, as well as different types of integration. Furthermore, it demonstrates how processes and systems can be integrated, and how management efficiency can be increased. The major part of this book focuses on management concepts which use integration as a key tool of management processes (e.g. the systematic approach, supply chain management, virtual and network organizations, processes management and total quality management). Case studies, illustrations, and tables are also provided to exemplify and illuminate the content, as well as examples of successful and failed integrations. Providing a particularly useful resource to managers and specialists involved in the improvement of organization...

  6. [Research and development of medical case database: a novel medical case information system integrating with biospecimen management].

    Science.gov (United States)

    Pan, Shiyang; Mu, Yuan; Wang, Hong; Wang, Tong; Huang, Peijun; Ma, Jianfeng; Jiang, Li; Zhang, Jie; Gu, Bing; Yi, Lujiang

    2010-04-01

    To meet the needs of management of medical case information and biospecimen simultaneously, we developed a novel medical case information system integrating with biospecimen management. The database established by MS SQL Server 2000 covered, basic information, clinical diagnosis, imaging diagnosis, pathological diagnosis and clinical treatment of patient; physicochemical property, inventory management and laboratory analysis of biospecimen; users log and data maintenance. The client application developed by Visual C++ 6.0 was used to implement medical case and biospecimen management, which was based on Client/Server model. This system can perform input, browse, inquest, summary of case and related biospecimen information, and can automatically synthesize case-records based on the database. Management of not only a long-term follow-up on individual, but also of grouped cases organized according to the aim of research can be achieved by the system. This system can improve the efficiency and quality of clinical researches while biospecimens are used coordinately. It realizes synthesized and dynamic management of medical case and biospecimen, which may be considered as a new management platform.

  7. Integrated Project Management: A Case Study in Integrating Cost, Schedule, Technical, and Risk Areas

    Science.gov (United States)

    Smith, Greg

    2004-01-01

    This viewgraph presentation describes a case study as a model for integrated project management. The ISS Program Office (ISSPO) developed replacement fluid filtration cartridges in house for the International Space Station (ISS). The presentation includes a step-by-step procedure and organizational charts for how the fluid filtration problem was approached.

  8. Case Mix Management Systems: An Opportunity to Integrate Medical Records and Financial Management System Data Bases

    Science.gov (United States)

    Rusnak, James E.

    1987-01-01

    Due to previous systems selections, many hospitals (health care facilities) are faced with the problem of fragmented data bases containing clinical, demographic and financial information. Projects to select and implement a Case Mix Management System (CMMS) provide an opportunity to reduce the number of separate physical files and to migrate towards systems with an integrated data base. The number of CMMS candidate systems is often restricted due to data base and system interface issues. The hospital must insure the CMMS project provides a means to implement an integrated on-line hospital information data base for use by departments in operating under a DRG-based Prospective Payment System. This paper presents guidelines for use in selecting a Case Mix Mangement System to meet the hospital's financial and operations planning, budgeting, marketing, and other management needs, while considering the data base implications of the implementation.

  9. Fire protection system management in nuclear facilities: strengthening factor of integrated management system - a case study

    International Nuclear Information System (INIS)

    Santos, Joao Regis dos

    2005-01-01

    The present study investigated and analyzed the importance of a system of integrated safety manage, environment and health in a nuclear installation, having as perspective, the fire protection manage. The inquiry was made using a qualitative research involving a case study, where the considered environment was the Reconversion and UO 2 Plant of the Industrias Nucleares do Brasil (INB), located in Resende, Rio de Janeiro and the studied population, the managers and the staff directly involved with the aspects related to the safety of the industrial complex of the related company. The motivation for the research was the search of a bigger interaction of the questions related to the safety, environment and health in the nuclear industry having, as axle of the investigation, the fire protection. As a result, it was observed that in a nuclear installation, although dealing with diversified safety processes, integration is possible and necessary, since there are more reasons for integration than otherwise. (author)

  10. Business process management and IT management: The missing integration

    DEFF Research Database (Denmark)

    Rahimi, Fatemeh; Møller, Charles; Hvam, Lars

    2016-01-01

    of IT on process innovations, the association between business process management and IT management is under-explored. Drawing on a literature analysis of the capabilities of business process and IT governance frameworks and findings from a case study, we propose the need for horizontal integration between the two......The importance of business processes and the centrality of IT to contemporary organizations' performance calls for a specific focus on business process management and IT management. Despite the wide scope of business process management covering both business and IT domains, and the profound impact...... management functions to enable strategic and operational business - IT alignment. We further argue that the role of IT in an organization influences the direction of integration between the two functions and thus the choice of integration mechanisms. Using case study findings, we propose...

  11. Milestones in Implementation of an Integrated Management System in the Health Sector. Case Study Radiologische Netzwerk Rheinland

    Directory of Open Access Journals (Sweden)

    Claus Nagel-Picioruş

    2016-05-01

    Full Text Available Healthcare organizations in Germany exploit the benefits of the ISO 9000 family of international standards as it became compulsory to implement a quality management system in accordance with ISO 9001 requirements. Until the innovative ISO 9001:2015 proposal it was no direct connection to the other management systems like risk management, knowledge management or environmental management. So far, only few bodies ensured interconnections between different systems of management or associated the quality management system with the strategic planning process. However, healthcare encapsulates supplementary requirements which affect a number of different systems. Additionally, the financial crisis has encouraged the trend to operate integrated reporting beyond financial aspects. This paper aims at presenting the experience on the development of integrated management and reporting system integrated in an organization belonging to the health sector. The work clarifies the steps towards merging distinctly regulated management systems (quality, health or environmental management with strategic planning and controlling, via a Balanced Dashboard (Balanced Scorecard - BSC as well as integrated reporting according to the model International Integrated Reporting Initiative (IIRI in a German medical company - Radiologische Netzwerk Rheinland - RNR AG. Using the case study method, the paper's purpose is to highlight approaches and results of the company that could support practitioners from medical area and bezound. The literature review clarified theoretical concepts while the case study allowed converging comprehensive information and knowledge accumulated by RNR AG, thus helping to bridge the gap between literature on total integrated management reporting and reporting system in healthcare.

  12. Integrated flood disaster management and spatial information : Case studies of Netherlands and India

    NARCIS (Netherlands)

    Ghawana, T. (T.); Kaur, A. (A.); Neuvel, J.M.M. (J.M.M.); Ziatanova, Z. (Z.)

    2014-01-01

    Int. Arch. Photogramm. Remote Sens. Spatial Inf. Sci., XL-8, 147-154, 2014www.int-arch-photogramm-remote-sens-spatial-inf-sci.net/XL-8/147/2014/doi:10.5194/isprsarchives-XL-8-147-2014Integrated flood disaster management and spatial information: Case studies ofNetherlands and IndiaS. Zlatanova1, T.

  13. INTEGRATED HSEQ MANAGEMENT SYSTEMS: DEVELOPMENTS AND TRENDS

    OpenAIRE

    Osmo Kauppila; Janne Härkönen; Seppo Väyrynen

    2015-01-01

    The integration of health and safety, environmental and quality (HSEQ) management systems has become a current topic in the 21st century, as the need for systems thinking has grown along with the number of management system standards. This study aims to map current developments and trends in integrated HSEQ management. Three viewpoints are taken: the current state of the main HSEQ management standards, research literature on integrated management systems (IMS), and a case study of an industry...

  14. Planning for integrated solid waste management at the industrial Park level: A case of Tianjin, China

    International Nuclear Information System (INIS)

    Geng Yong; Zhu Qinghua; Haight, Murray

    2007-01-01

    Industrial parks play a significant role in the production and use of goods and services. The proper management of solid waste is a major challenge for industrial parks due to the large quantity of wastes and the variability of waste characteristics from these types of developments. Therefore, integrated solid waste management has become very crucial to the industrial park managers. Such an approach requires industrial park managers to assess the overall use of resources, and to seek waste reduction, reuse and recycling opportunities both at the individual company level and among different tenant companies. The adoption of this method can bring both economic and environmental benefits. This paper introduces the planning efforts of a real case in China. It first presents the basic information on Tianjin Economic Development Area (TEDA), and then introduces its current practices on solid waste management. The main focus of this paper is to describe how to plan an integrated solid waste management system at TEDA. Benefits and challenges are all identified and analyzed. The experiences and methods from this case study should be applied in other industrial parks so as to improve the overall eco-efficiency of the whole industrial park

  15. Case Mix Management Systems: An Opportunity to Integrate Medical Records and Financial Management System Data Bases

    OpenAIRE

    Rusnak, James E.

    1987-01-01

    Due to previous systems selections, many hospitals (health care facilities) are faced with the problem of fragmented data bases containing clinical, demographic and financial information. Projects to select and implement a Case Mix Management System (CMMS) provide an opportunity to reduce the number of separate physical files and to migrate towards systems with an integrated data base. The number of CMMS candidate systems is often restricted due to data base and system interface issues. The h...

  16. [Case management process identified from experience of nurse case managers].

    Science.gov (United States)

    Park, Eun-Jun; Kim, Chunmi

    2008-12-01

    The purpose of this study was to develop a substantive theory of case management (CM) practice by investigating the experience of nurse case managers caring for Medical Aid enrollees in Korea. A total of 12 nurses were interviewed regarding their own experience in CM practice. Data were recorded and analyzed using grounded theory. Empowerment was the core category of CM for Medical Aid enrollees. The case managers engaged in five phases as follows, phase of inquiring in advance, building a relationship with the client, giving the client critical mind, facilitating positive changes in the client's use of healthcare services, and maintaining relationship bonds. These phases moved gradually and were circular if necessary. Also, they were accelerated or slowed depending on factors including clients' characteristics, case managers' competency level, families' support level, and availability of community resources. This study helps understand what CM practice is and how nurses are performing this innovative CM role. It is recommended that nurse leaders and policy makers integrate empowerment as a core category and the five critical CM phases into future CM programs.

  17. Integrated management software files action in case of fire; Software de gestion integral de fichas de actuacion en caso de incendio

    Energy Technology Data Exchange (ETDEWEB)

    Moreno-Ventas Garcia, V.; Gimeno Serrano, F.

    2010-07-01

    The proper management of emergencies, is a challenge for which it is essential to be prepared. Integrated Software Performance Chips In case of fire and rapid access to information, make this application a must to effectively drive any emergency due to fire at any nuclear facility.

  18. IMPLEMENTING AN INTEGRATED HEALTH, SAFETY, AND ENVIRONMENTAL MANAGEMENT SYSTEM: THE CASE OF A CONSTRUCTION COMPANY

    Directory of Open Access Journals (Sweden)

    Filippos Tepaskoualos

    2017-12-01

    Full Text Available Over the past two decades, there has been an increasing trend of organizations implementing simultaneously two or more management systems. The structural similarities of these systems - despite the diversity of their fields of application, such as occupational health and safety for OHSAS 18001, and environmental management for ISO 14001 - have enabled many organizations to integrate different systems into a single one, rather than implementing them separately from one another. The purpose of this paper is to examine in depth a case of integration of the ISO 14001 and OHSAS 18001 systems, using a construction company as a research setting, in order to draw conclusions about the level of integration achieved, as well as the benefits, the problems, and the critical success factors of this endeavour. The findings of this study show that both the company's devotion to the fulfillment of the critical success factors and the identical structure of the two systems under consideration have facilitated the successful outcome of integration. However, this does not automatically imply that the company adopted the idea of full integration. Instead, the maximization of integration benefits and the elimination of related problems was achieved through the company's conscious choice to proceed with partial integration, keeping separate manuals, policies, and risk management procedures for each system. This study will be useful in order to understand that partial integration is a perfectly acceptable and realistic solution that, under certain circumstances, may even have a better cost-benefit ratio than full integration.

  19. INTEGRATED HSEQ MANAGEMENT SYSTEMS: DEVELOPMENTS AND TRENDS

    Directory of Open Access Journals (Sweden)

    Osmo Kauppila

    2015-06-01

    Full Text Available The integration of health and safety, environmental and quality (HSEQ management systems has become a current topic in the 21st century, as the need for systems thinking has grown along with the number of management system standards. This study aims to map current developments and trends in integrated HSEQ management. Three viewpoints are taken: the current state of the main HSEQ management standards, research literature on integrated management systems (IMS, and a case study of an industry-led HSEQ cluster in Northern Finland. The results demonstrate that some of the most prominent current trends are the harmonization of the high level structure of management systems by ISO, the evaluation of IMS, accounting for the supply chain in HSEQ issues, and sustainability and risk management. The results of the study can be used by practitioners to get a view of the current state of HSEQ management systems and their integration, and by researchers to seek out potential directions for HSEQ and IMS related research.

  20. The integrity management cycle as a business process

    Energy Technology Data Exchange (ETDEWEB)

    Ackhurst, Trent B.; Peverelli, Romina P. [PIMS - Pipeline Integrity Management Specialists of London Ltd. (United Kingdom).

    2009-07-01

    It is a best-practice Oil and Gas pipeline integrity and reliability technique to apply integrity management cycles. This is conforms to the business principles of continuous improvement. This paper examines the integrity management cycle - both goals and objectives and subsequent component steps - from a business perspective. Traits that businesses require, to glean maximum benefit from such a cycle, are highlighted. A case study focuses upon an integrity and reliability process developed to apply to pipeline operators. installations. This is compared and contrasted to the pipeline integrity management cycle to underline both cycles. consistency with the principles of continuous improvement. (author)

  1. [Thalamic Stroke and Associated Behavior Disorders. Possibilities for Integral Management: Case Report].

    Science.gov (United States)

    Camargo, Loida Camargo; Sánchez, Katherine Parra

    2012-06-01

    Since ancient Greece, cerebrovascular accidents have been described with no variation. Even today, they are still a catastrophic event in the lives of patients with a high risk of disabling sequelae. Case report of a 56-year male patient with thalamic ischemia. The intervention with integral strategies involving pharmacological management and cognitive interventions was decisive for the satisfactory evolution of the patient. The management of patients with cerebrovascular accidents cannot be limited to the emergency room. Pharmacological advances in programs and cognitive intervention methods provide intervention tools from the very beginning of the stroke thus reducing the impact of long-term sequelae, and consequently enabling a better reintegration of the patient to his family. Copyright © 2012 Asociación Colombiana de Psiquiatría. Publicado por Elsevier España. All rights reserved.

  2. Technology management: case study of an integrated health system.

    Science.gov (United States)

    Dahl, D H; McFarlan, T K

    1994-12-01

    Technology management has assumed a role of vital importance in today's health care environment. Capital reserves and operating income have been stretched by pervasive and expensive technologies, while overall reimbursement has been reduced. It is imperative for hospitals to develop and consistently use technology management processes that begin prior to a technology's introduction in the hospital and continue throughout its life cycle. At Samaritan Health System (SHS), an integrated health care delivery system based in Phoenix, technology management provides tools to improve decision making and assist in the system's integration strategy as well as control expenses. SHS uses a systemwide technology-specific plan to guide acquisition and/or funding decisions. This plan describes how particular technologies can help achieve SHS' organizational goals such as promoting system integration and/or improving patient outcomes while providing good economic value. After technologies are targeted in this systemwide plan they are prioritized using a two-stage capital prioritization process. The first stage of the capital prioritization process considers the quantitative and qualitative factors critical for equitable capital distribution across the system. The second stage develops a sense of ownership among the parties that affect and are affected by the allocation at a facility level. This process promotes an efficient, effective, equitable, and defensible approach to resource allocation and technology decision making. Minimizing equipment maintenance expenditures is also an integral part of technology management at SHS. The keys to reducing maintenance expenditures are having a process in place that supports a routine fiscal evaluation of maintenance coverage options and ensuring that manufacturers are obligated to provide critical maintenance resources at the time of equipment purchase. Maintenance service options under consideration in this report include full

  3. Export channel pricing management for integrated solutions

    OpenAIRE

    Roine, Henna; Sainio, Liisa-Maija; Saarenketo, Sami

    2012-01-01

    This article studies systems integrators' export channel pricing management for integrated solutions. We find support from our empirical case study for the notion that a systems integrator's export channel pricing strategy is multidimensional and dependent on international pricing environment and partner characteristics and that export partnerships have unique implications on a systems integrator's pricing process. The results show that giving up pricing control in export channel context may ...

  4. Improving pneumonia case-management in Benin: a randomized trial of a multi-faceted intervention to support health worker adherence to Integrated Management of Childhood Illness guidelines

    Directory of Open Access Journals (Sweden)

    Lama Marcel

    2009-08-01

    Full Text Available Abstract Background Pneumonia is a leading cause of death among children under five years of age. The Integrated Management of Childhood Illness strategy can improve the quality of care for pneumonia and other common illnesses in developing countries, but adherence to these guidelines could be improved. We evaluated an intervention in Benin to support health worker adherence to the guidelines after training, focusing on pneumonia case management. Methods We conducted a randomized trial. After a health facility survey in 1999 to assess health care quality before Integrated Management of Childhood Illness training, health workers received training plus either study supports (job aids, non-financial incentives and supervision of workers and supervisors or "usual" supports. Follow-up surveys were conducted in 2001, 2002 and 2004. Outcomes were indicators of health care quality for Integrated Management-defined pneumonia. Further analyses included a graphical pathway analysis and multivariable logistic regression modelling to identify factors influencing case-management quality. Results We observed 301 consultations of children with non-severe pneumonia that were performed by 128 health workers in 88 public and private health facilities. Although outcomes improved in both intervention and control groups, we found no statistically significant difference between groups. However, training proceeded slowly, and low-quality care from untrained health workers diluted intervention effects. Per-protocol analyses suggested that health workers with training plus study supports performed better than those with training plus usual supports (20.4 and 19.2 percentage-point improvements for recommended treatment [p = 0.08] and "recommended or adequate" treatment [p = 0.01], respectively. Both groups tended to perform better than untrained health workers. Analyses of treatment errors revealed that incomplete assessment and difficulties processing clinical findings

  5. Case Management Directors

    Science.gov (United States)

    Bankston White, Cheri; Birmingham, Jackie

    2015-01-01

    Purpose and Objectives: Case management directors are in a dynamic position to affect the transition of care of patients across the continuum, work with all levels of providers, and support the financial well-being of a hospital. Most importantly, they can drive good patient outcomes. Although the position is critical on many different levels, there is little to help guide a new director in attending to all the “moving parts” of such a complex role. This is Part 2 of a two-part article written for case management directors, particularly new ones. Part 1 covered the first 4 of 7 tracks: (1) Staffing and Human Resources, (2) Compliance and Accreditation, (3) Discharge Planning and (4) Utilization Review and Revenue Cycle. Part 2 addresses (5) Internal Departmental Relationships (Organizational), (6) External Relationships (Community Agency), and (7) Quality and Program Outcomes. This article attempts to answer the following questions: Are case management directors prepared for an expanded role that affects departments and organizations outside of their own?How does a case management director manage the transition of care of patients while managing required relationships outside the department?How does the director manage program outcomes in such a complex department? Primary Practice Setting: The information is most meaningful to those case management directors who work in either stand-alone hospitals or integrated health systems and have frontline case managers (CMs) reporting to them. Findings/Conclusions: Part 1 found that case management directors would benefit from further research and documentation of “best practices” related to their role, particularly in the areas of leadership and management. The same conclusion applies to Part 2, which addresses the director's responsibilities outside her immediate department. Leadership and management skills apply as well to building strong, productive relationships across a broad spectrum of external organizations

  6. Design Integration of Facilities Management

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2009-01-01

    One of the problems in the building industry is a limited degree of learning from experiences of use and operation of existing buildings. Development of professional facilities management (FM) can be seen as the missing link to bridge the gap between building operation and building design....... Strategies, methods and barriers for the transfer and integration of operational knowledge into the design process are discussed. Multiple strategies are needed to improve the integration of FM in design. Building clients must take on a leading role in defining and setting up requirements and procedures...... on literature studies and case studies from the Nordic countries in Europe, including research reflections on experiences from a main case study, where the author, before becoming a university researcher, was engaged in the client organization as deputy project director with responsibility for the integration...

  7. Integrated economic model of waste management: Case study for South Moravia region

    Directory of Open Access Journals (Sweden)

    Jiří Hřebíček

    2013-01-01

    Full Text Available The paper introduces and discusses the developed integrated economic model of municipal waste management of the Czech Republic, which was developed by authors as a balanced network model for a set of sources (mostly municipalities of municipal solid waste connected with a set of chosen waste treatment facilities processing their waste. Model is implemented as a combination of several economic submodels including environmental and economic point of view. It enables to formulate the optimisation problem in a concise way and the resulting model is easily scalable. Model involves submodels of waste prevention, collection and transport optimization, submodels of waste energy utilization (incineration and biogas plants and material recycling (composting and submodel of landfilling. Its size (number of sources and facilities depends only upon available data. Its application is used in the case study of the South Moravia region with verification of using time series waste data. The results enable to improve decision making in waste management sector.

  8. Uncertainty management in integrated modelling, the IMAGE case

    International Nuclear Information System (INIS)

    Van der Sluijs, J.P.

    1995-01-01

    Integrated assessment models of global environmental problems play an increasingly important role in decision making. This use demands a good insight regarding the reliability of these models. In this paper we analyze uncertainty management in the IMAGE-project (Integrated Model to Assess the Greenhouse Effect). We use a classification scheme comprising type and source of uncertainty. Our analysis shows reliability analysis as main area for improvement. We briefly review a recently developed methodology, NUSAP (Numerical, Unit, Spread, Assessment and Pedigree), that systematically addresses the strength of data in terms of spread, reliability and scientific status (pedigree) of information. This approach is being tested through interviews with model builders. 3 tabs., 20 refs

  9. Application of the critical pathway and integrated case teaching method to nursing orientation.

    Science.gov (United States)

    Goodman, D

    1997-01-01

    Nursing staff development programs must be responsive to current changes in healthcare. New nursing staff must be prepared to manage continuous change and to function competently in clinical practice. The orientation pathway, based on a case management model, is used as a structure for the orientation phase of staff development. The integrated case is incorporated as a teaching strategy in orientation. The integrated case method is based on discussion and analysis of patient situations with emphasis on role modeling and integration of theory and skill. The orientation pathway and integrated case teaching method provide a useful framework for orientation of new staff. Educators, preceptors and orientees find the structure provided by the orientation pathway very useful. Orientation that is developed, implemented and evaluated based on a case management model with the use of an orientation pathway and incorporation of an integrated case teaching method provides a standardized structure for orientation of new staff. This approach is designed for the adult learner, promotes conceptual reasoning, and encourages the social and contextual basis for continued learning.

  10. INTEGRATED WATERSHED MANAGEMENT: PRINCIPLES AND PRACTICE. Book Review

    Science.gov (United States)

    Through a wide range of information and topics, Integrated Watershed Management Principles and Practice shows how involved the watershed management planning process can be. The book is informative, and the author obviously has researched the subject thoroughly. The book's case...

  11. Integrating Organizational Learning and Business Praxis: A Case for Intelligent Project Management.

    Science.gov (United States)

    Cavaleri, Steven A.; Fearon, David S.

    2000-01-01

    Project management provides a natural home for organizational learning, freeing it from mechanical processes. Organizational learning plays a critical role in intelligent project management, which combines manageability, performance outcomes of knowledge management, and innovation. Learning should be integrated into an organization's core…

  12. Evaluation of Integrated Coastal Zone Management Plan Practices in the Turkish Case

    Science.gov (United States)

    Doruk Özügül, M.; Yerliyurt, Bora; Seçilmişler, Töre

    2017-10-01

    In terms of both international and national contexts, mostly coastal zones are the place of complexity, vulnerability and competition, so that they have to be well-planned and managed. Diversity in users, land uses, investments, sectoral plans and policies make coastal areas highly complex and problematic zones where competition also takes place. Unless these dimensions of pressure aren’t balanced with precautionary actions, coastal zones transform into more vulnerable geographies. Within this context “Integrated Coastal Zone Management (ICZM) Plan” appears as a major tool where “integration” becomes a vital keyword for such diversifying environments. This integration challenge covers sectoral, administrative, spatial, interdisciplinary (in terms of scientific research fields) and internationality dimensions. A set of basic principles could also be obtained from the literature in order to reach a better ICZM Plan practice. These could be summarized as; “a broader perspective”, “a long-term perspective”, “adaptive management and monitoring”, “local specificities, specific solutions and flexible measures”, “carrying capacity of ecosystems”, “a participatory process”, “well coordination of policies and partners” and “coherence between sectoral policy objectives, planning and management”. A similar problematic conceptualization is also viable for Turkey, where approximately 76% of the total border length and 27 of 81 provinces are coastal. Naturally, both ICZM and coastal zone planning are within the emerging planning issues of national agenda. The purpose of this paper is to examine the Turkish practices depending on the above-mentioned principles by comparing various official ICZM plans of selected provinces. As a general conclusion it is seen that ICZM -to be an integrative and multi-dimensional tool- is contextually misunderstood. From this perspective “the determination of the plan borders”, “unsuitability of the

  13. Clinical results of HIS, RIS, PACS integration using data integration CASE tools

    Science.gov (United States)

    Taira, Ricky K.; Chan, Hing-Ming; Breant, Claudine M.; Huang, Lu J.; Valentino, Daniel J.

    1995-05-01

    Current infrastructure research in PACS is dominated by the development of communication networks (local area networks, teleradiology, ATM networks, etc.), multimedia display workstations, and hierarchical image storage architectures. However, limited work has been performed on developing flexible, expansible, and intelligent information processing architectures for the vast decentralized image and text data repositories prevalent in healthcare environments. Patient information is often distributed among multiple data management systems. Current large-scale efforts to integrate medical information and knowledge sources have been costly with limited retrieval functionality. Software integration strategies to unify distributed data and knowledge sources is still lacking commercially. Systems heterogeneity (i.e., differences in hardware platforms, communication protocols, database management software, nomenclature, etc.) is at the heart of the problem and is unlikely to be standardized in the near future. In this paper, we demonstrate the use of newly available CASE (computer- aided software engineering) tools to rapidly integrate HIS, RIS, and PACS information systems. The advantages of these tools include fast development time (low-level code is generated from graphical specifications), and easy system maintenance (excellent documentation, easy to perform changes, and centralized code repository in an object-oriented database). The CASE tools are used to develop and manage the `middle-ware' in our client- mediator-serve architecture for systems integration. Our architecture is scalable and can accommodate heterogeneous database and communication protocols.

  14. Managing harvest and habitat as integrated components

    Science.gov (United States)

    Osnas, Erik; Runge, Michael C.; Mattsson, Brady J.; Austin, Jane E.; Boomer, G. S.; Clark, R. G.; Devers, P.; Eadie, J. M.; Lonsdorf, E. V.; Tavernia, Brian G.

    2014-01-01

    how to better understand, guide and justify decisions about conservation investments in waterfowl management. Future efforts to integrate harvest and habitat management will include completion of the species-specific case-studies, initiation of policy discussions around how to integrate the decision contexts and governing institutions, and possible consideration of a new level of integrationintegration of harvest and habitats management decisions across waterfowl stocks.

  15. Integrating cost management and work management concepts for operations

    International Nuclear Information System (INIS)

    Vanditmars, C.

    1995-01-01

    Development of B C Gas Utility Limited's integrated work and cost management system was described, with emphasis on cost management without reliance on the financial systems, and standard costing and operational side benefits. The objectives of the system were identified as dynamic monitoring and control, and local empowerment. The concept underlying the two systems was explained in detail. In the case of the work management system the ability to manage all work in operations areas was stressed, along with its universal availability. Other benefits expected included improved resource utilization, improved productivity, better control of cost, improved revenue generation, superior customer service, a simplified financial system, and improved employee motivation through empowerment

  16. Integrated management of waterbirds: Beyond the conventional

    Science.gov (United States)

    Erwin, R.M.; Parsons, Katharine C.; Brown, Stephen C.; Erwin, R. Michael; Czech, Helen A.; Coulson, John C.

    2002-01-01

    Integrated waterbird management over the past few decades has implicitly referred to methods for managing wetlands that usually attempt to enhance habitat for taxonomic groups such as shorebirds and wading birds, in addition to waterfowl, the traditional focus group. Here I describe five elements of integration in management: taxonomic, spatial, temporal, population and habitat, and multiple-use management objectives. Spatial integration simply expands the scale of management concern. Rather than emphasizing management on a very limited number of impoundments or wetlands in small refuges or wildlife management areas, the vision is beginning to shift to connectivity within larger landscapes on the order of many square kilometers as telemetry data on daily and seasonal movements for many species become available. Temporal integration refers to the potential for either simultaneous management for waterbirds and commercial 'crops' (e.g., crayfish and rice) or for temporally-staggered management such as row crop production in spring-summer growing seasons and waterbird management on fallow fields in the non-growing (winter) season. Integrating population dynamics with habitats has become a major research focus over the past decade. Identifying which wetlands are ?sources? or ?sinks? for specific populations provides managers with critical information about effective management. Further, the applications of spatially explicit population models place heavy demands on researchers to identify use patterns for breeding and dispersing individuals by age, sex, and reproductive class. Population viability analysis models require much the same information. Finally, multiple-use management integration refers to trying to optimize the uses of wetlands, when only one (perhaps secondary) use may include waterbird management. Depending upon the ownership and primary land use of a particular parcel of land containing wetlands and/or water bodies, managing for waterbirds may be an

  17. Integrated solid waste management: a palliative to existing waste ...

    African Journals Online (AJOL)

    As a concept, Integrated Solid Waste Management (ISWM) is a sustainable ... on the perspective of consumers on waste generation, collection and disposal. ... to effective solid waste management in the case study area; non-sorting and ...

  18. Cumulative environmental impacts and integrated coastal management: the case of Xiamen, China.

    Science.gov (United States)

    Xue, Xiongzhi; Hong, Huasheng; Charles, Anthony T

    2004-07-01

    This paper examines the assessment of cumulative environmental impacts and the implementation of integrated coastal management within the harbour of Xiamen, China, an urban region in which the coastal zone is under increasing pressure as a result of very rapid economic growth. The first stage of analysis incorporates components of a cumulative effects assessment, including (a) identification of sources of environmental impacts, notably industrial expansion, port development, shipping, waste disposal, aquaculture and coastal construction, (b) selection of a set of valued ecosystem components, focusing on circulation and siltation, water quality, sediment, the benthic community, and mangrove forests, and (c) use of a set of key indicators to examine cumulative impacts arising from the aggregate of human activities. In the second stage of analysis, the paper describes and assesses the development of an institutional framework for integrated coastal management in Xiamen, one that combines policy and planning (including legislative and enforcement mechanisms) with scientific and monitoring mechanisms (including an innovative 'marine functional zoning' system). The paper concludes that the integrated coastal management framework in Xiamen has met all relevant requirements for 'integration' as laid out in the literature, and has explicitly incorporated consideration of cumulative impacts within its management and monitoring processes.

  19. Health worker perceptions of integrating mobile phones into community case management of malaria in Saraya, Senegal.

    Science.gov (United States)

    Blanas, Demetri A; Ndiaye, Youssoupha; MacFarlane, Matthew; Manga, Isaac; Siddiqui, Ammar; Velez, Olivia; Kanter, Andrew S; Nichols, Kim; Hennig, Nils

    2015-05-01

    Although community case management of malaria increases access to life-saving care in isolated settings, it contends with many logistical challenges. Mobile phone health information technology may present an opportunity to address a number of these barriers. Using the wireless adaptation of the technology acceptance model, this study assessed availability, ease of use, usefulness, and job relevance of mobile phones by health workers in Saraya, Senegal. This study conducted seven key informant interviews with government health workers, and three focus groups and 76 surveys with lay health workers. Principal findings included that mobile phones are already widely available and used, and that participants valued using phones to address training, stock management, programme reporting, and transportation challenges. By documenting widespread use of mobile phones and health worker perceptions of their most useful applications, this paper provides a framework for their integration into the community case management of malaria programme in Saraya, Senegal. © The Author 2014. Published by Oxford University Press on behalf of Royal Society of Tropical Medicine and Hygiene. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  20. Nationwide implementation of integrated community case management of childhood illness in Rwanda

    Science.gov (United States)

    Mugeni, Catherine; Levine, Adam C; Munyaneza, Richard M; Mulindahabi, Epiphanie; Cockrell, Hannah C; Glavis-Bloom, Justin; Nutt, Cameron T; Wagner, Claire M; Gaju, Erick; Rukundo, Alphonse; Habimana, Jean Pierre; Karema, Corine; Ngabo, Fidele; Binagwaho, Agnes

    2014-01-01

    ABSTRACT Background: Between 2008 and 2011, Rwanda introduced integrated community case management (iCCM) of childhood illness nationwide. Community health workers in each of Rwanda's nearly 15,000 villages were trained in iCCM and equipped for empirical diagnosis and treatment of pneumonia, diarrhea, and malaria; for malnutrition surveillance; and for comprehensive reporting and referral services. Methods: We used data from the Rwanda health management information system (HMIS) to calculate monthly all-cause under-5 mortality rates, health facility use rates, and community-based treatment rates for childhood illness in each district. We then compared a 3-month baseline period prior to iCCM implementation with a seasonally matched comparison period 1 year after iCCM implementation. Finally, we compared the actual changes in all-cause child mortality and health facility use over this time period with the changes that would have been expected based on baseline trends in Rwanda. Results: The number of children receiving community-based treatment for diarrhea and pneumonia increased significantly in the 1-year period after iCCM implementation, from 0.83 cases/1,000 child-months to 3.80 cases/1,000 child-months (P = .01) and 0.25 cases/1,000 child-months to 5.28 cases/1,000 child-months (P<.001), respectively. On average, total under-5 mortality rates declined significantly by 38% (P<.001), and health facility use declined significantly by 15% (P = .006). These decreases were significantly greater than would have been expected based on baseline trends. Conclusions: This is the first study to demonstrate decreases in both child mortality and health facility use after implementing iCCM of childhood illness at a national level. While our study design does not allow for direct attribution of these changes to implementation of iCCM, these results are in line with those of prior studies conducted at the sub-national level in other low-income countries. PMID:25276592

  1. Combining integrated river modelling and agent based social simulation for river management; The case study of the Grensmaas project

    NARCIS (Netherlands)

    Valkering, P.; Krywkow, Jorg; Rotmans, J.; van der Veen, A.; Douben, N.; van Os, A.G.

    2003-01-01

    In this paper we present a coupled Integrated River Model – Agent Based Social Simulation model (IRM-ABSS) for river management. The models represent the case of the ongoing river engineering project “Grensmaas”. In the ABSS model stakeholders are represented as computer agents negotiating a river

  2. Development and Implementation of Integrated Pest Management in ...

    African Journals Online (AJOL)

    Nafiisah

    This paper reviews the status of Integrated Pest Management (IPM) research in. Mauritius and also reports on the successful cases of IPM implementation during ... Tool. Activity. Status. Source. Biological control. Introduce parasitoids .... 10 g sugar in 1 L of water) in plastic bottles as one option to manage fruit flies in.

  3. Integrated Risk Management Within NASA Programs/Projects

    Science.gov (United States)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  4. An ecosystem service approach to support integrated pond management: a case study using Bayesian belief networks--highlighting opportunities and risks.

    Science.gov (United States)

    Landuyt, Dries; Lemmens, Pieter; D'hondt, Rob; Broekx, Steven; Liekens, Inge; De Bie, Tom; Declerck, Steven A J; De Meester, Luc; Goethals, Peter L M

    2014-12-01

    Freshwater ponds deliver a broad range of ecosystem services (ESS). Taking into account this broad range of services to attain cost-effective ESS delivery is an important challenge facing integrated pond management. To assess the strengths and weaknesses of an ESS approach to support decisions in integrated pond management, we applied it on a small case study in Flanders, Belgium. A Bayesian belief network model was developed to assess ESS delivery under three alternative pond management scenarios: intensive fish farming (IFF), extensive fish farming (EFF) and nature conservation management (NCM). A probabilistic cost-benefit analysis was performed that includes both costs associated with pond management practices and benefits associated with ESS delivery. Whether or not a particular ESS is included in the analysis affects the identification of the most preferable management scenario by the model. Assessing the delivery of a more complete set of ecosystem services tends to shift the results away from intensive management to more biodiversity-oriented management scenarios. The proposed methodology illustrates the potential of Bayesian belief networks. BBNs facilitate knowledge integration and their modular nature encourages future model expansion to more encompassing sets of services. Yet, we also illustrate the key weaknesses of such exercises, being that the choice whether or not to include a particular ecosystem service may determine the suggested optimal management practice. Copyright © 2014 Elsevier Ltd. All rights reserved.

  5. Case management.

    Science.gov (United States)

    Woodward, Judy; Rice, Eve

    2015-03-01

    Health care in the United States is changing rapidly under pressure from both political and professional stakeholders, and one area on the front line of required change is the discipline of case management. Historically, case management has worked to defragment the health care delivery system for clients and increase access to health care. Case management will have an expanded role resulting from Affordable Care Act initiatives to improve health care. This article includes definitions of case management, current issues related to case management, case management standards of practice, and a case study of the management of pediatric chronic disease. Copyright © 2015 Elsevier Inc. All rights reserved.

  6. Carbon Market and Integrated Waste Solutions : a Case Study of ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Carbon Market and Integrated Waste Solutions : a Case Study of Indonesia ... dual purpose of helping developing countries achieve sustainable development ... with a view to devising integrated waste management solutions in urban centres ... and disseminate them through national, regional and international networks.

  7. Governance in support of integrated flood risk management? The case of Romania

    NARCIS (Netherlands)

    Vinke-de Kruijf, Joanne; Kuks, Stefanus M.M.; Augustijn, Dionysius C.M.

    2015-01-01

    Building on an existing model of governance, this paper aims to assess the supportiveness of Romania׳s structural flood risk governance context towards integrated flood risk management. We assert that a governance structure supports the development and implementation of integrated flood risk

  8. Integration of QR codes into an anesthesia information management system for resident case log management.

    Science.gov (United States)

    Avidan, Alexander; Weissman, Charles; Levin, Phillip D

    2015-04-01

    Quick response (QR) codes containing anesthesia syllabus data were introduced into an anesthesia information management system. The code was generated automatically at the conclusion of each case and available for resident case logging using a smartphone or tablet. The goal of this study was to evaluate the use and usability/user-friendliness of such system. Resident case logging practices were assessed prior to introducing the QR codes. QR code use and satisfactions amongst residents was reassessed at three and six months. Before QR code introduction only 12/23 (52.2%) residents maintained a case log. Most of the remaining residents (9/23, 39.1%) expected to receive a case list from the anesthesia information management system database at the end of their residency. At three months and six months 17/26 (65.4%) and 15/25 (60.0%) residents, respectively, were using the QR codes. Satisfaction was rated as very good or good. QR codes for residents' case logging with smartphones or tablets were successfully introduced in an anesthesia information management system and used by most residents. QR codes can be successfully implemented into medical practice to support data transfer. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  9. Organising Sustainability Competencies through Quality Management: Integration or Specialisation

    Directory of Open Access Journals (Sweden)

    Vanajah Siva

    2018-04-01

    Full Text Available A significant step in integrating environmental sustainability into daily operations is through product development. One way to achieve such integration of environmental considerations into product development is by relating sustainability competencies to practices of Quality Management. However, practices seem to vary for how competencies within environmental sustainability are organised in order to make sustainability more actionable. This study explores two ways of organising sustainability competencies in product development: integration and specialisation. The organisation of sustainability competency is illustrated through two cases; one case in which sustainability is integrated with the quality management competency, and the other in which a new competency focusing on sustainability has been added as a separate function in product development. It is suggested that the organisation of sustainability competency influences the extent of environmental impact. Further, trade-offs, such as material source versus weight may not be exploited when sustainability is integrated as one area of responsibility for another specialty competency, suggesting a lack of sufficient competency within environmental sustainability to recognise potential trade-offs between—for example—quality and environmental impact.

  10. Integration of Standardized Management Systems: A Dilemma?

    Directory of Open Access Journals (Sweden)

    Manuel Ferreira Rebelo

    2015-06-01

    Full Text Available The growing proliferation of management systems standards (MSSs, and their individualized implementation, is a real problem faced by organizations. On the other hand, MSSs are aimed at improving efficiency and effectiveness of organizational responses in order to satisfy the requirements, needs and expectations of the stakeholders. Each organization has its own identity and this is an issue that cannot be neglected; hence, two possible approaches can be attended. First, continue with the implementation of individualized management systems (MSs; or, integrate the several MSSs versus related MSs into an integrated management system (IMS. Therefore, in this context, organizations are faced with a dilemma, as a result of the increasing proliferation and diversity of MSSs. This paper takes into account the knowledge gained through a case study conducted in the context of a Portuguese company and unveils some of the advantages and disadvantages of integration. A methodology is also proposed and presented to support organizations in developing and structuring the integration process of their individualized MSs, and consequently minimize problems that are generators of inefficiencies, value destruction and loss of competitiveness. The obtained results provide relevant information that can support Top Management decision in solving that dilemma and consequently promote a successful integration, including a better control of business risks associated to MSSs requirements and enhancing sustainable performance, considering the context in which organizations operate.

  11. Integrated flood disaster management and spatial information : Case studies of Netherlands and India

    NARCIS (Netherlands)

    Zlatanova, S.; Ghawana, T.; Kaur, A.; Neuvel, J.M.M.

    2014-01-01

    Spatial Information is an integral part of flood management practices which include risk management & emergency response processes. Although risk & emergency management activities have their own characteristics, for example, related to the time scales, time pressure, activities & actors involved, it

  12. Integrated nursery pest management

    Science.gov (United States)

    R. Kasten Dumroese

    2012-01-01

    What is integrated pest management? Take a look at the definition of each word to better understand the concept. Two of the words (integrated and management) are relatively straightforward. Integrated means to blend pieces or concepts into a unified whole, and management is the wise use of techniques to successfully accomplish a desired outcome. A pest is any biotic (...

  13. Integrating natural and social sciences to inspire public confidence in radioactive waste policy case study - Committee on radioactive waste management

    International Nuclear Information System (INIS)

    Usher, Sam

    2007-01-01

    Integrating Natural and Social Sciences to Inspire Public Confidence in Radioactive Waste Policy Case Study: Committee on Radioactive Waste Management Implementing effective long-term radioactive waste management policy is challenging, and both UK and international experience is littered with policy and programme failures. Policy must not only be underpinned by sound science and technical rationale, it must also inspire the confidence of the public and other stakeholders. However, in today's modern society, communities will not simply accept the word of scientists for setting policy based purely on technical grounds. This is particularly so in areas where there are significant social and ethical issues, such as radioactive waste disposal. To develop and implement effective policy, governments, waste owners and implementing bodies must develop processes which effectively integrate both complex technical and scientific issues, with equally challenging social and ethical concerns. These integrating processes must marry often intricate technical issues with broad public and stakeholder engagement programmes, in programmes which can expect the highest levels of public scrutiny, and must invariably be delivered within challenging time and budget constraints. This paper considers a model for how such integrating processes can be delivered. The paper reviews, as a case study, how such challenges were overcome by the Committee on Radioactive Waste Management (CoRWM), which, in July 2006, made recommendations to the UK government for the establishment of a long-term radioactive waste policy. Its recommendations were underpinned by sound science, but also engendered public confidence through undertaking the largest and most significant deliberative public and stakeholder engagement programme on a complex policy issue in the UK. Effective decision-making was enabled through the integration of both proven and bespoke methodologies, including Multi-criteria Decision Analysis and

  14. Integrated waste and water management system

    Science.gov (United States)

    Murray, R. W.; Sauer, R. L.

    1986-01-01

    The performance requirements of the NASA Space Station have prompted a reexamination of a previously developed integrated waste and water management system that used distillation and catalytic oxydation to purify waste water, and microbial digestion and incineration for waste solids disposal. This system successfully operated continuously for 206 days, for a 4-man equivalent load of urine, feces, wash water, condensate, and trash. Attention is given to synergisms that could be established with other life support systems, in the cases of thermal integration, design commonality, and novel technologies.

  15. Integral consideration of integrated management systems

    International Nuclear Information System (INIS)

    Frauenknecht, Stefan; Schmitz, Hans

    2010-01-01

    Aim of the project for the NPPs Kruemmel and Brunsbuettel (Vattenfall) is the integral view of the business process as basis for the implementation and operation of management systems in the domains quality, safety and environment. The authors describe the integral view of the business processes in the frame of integrated management systems with the focus nuclear safety, lessons learned in the past, the concept of a process-based controlling system and experiences from the practical realization.

  16. Integration of case study approach, project design and computer ...

    African Journals Online (AJOL)

    Integration of case study approach, project design and computer modeling in managerial accounting education ... Journal of Fundamental and Applied Sciences ... in the Laboratory of Management Accounting and Controlling Systems at the ...

  17. Ecological and Socio-Economic Modeling of Consequences of Biological Management Scenarios Implementation in Integrated Watershed Management (Case Study: Simindasht Catchment

    Directory of Open Access Journals (Sweden)

    A. R. Keshtkar

    2016-09-01

    Full Text Available Integrated watershed management is considered as a new principle for development planning and management of water and soil resources emphasizing on socio-economic characteristics of the region to sustainable livelihoods without vulnerability for plants and the residents of an area. This research, in line with the objectives of integrated management, has been carried out for modelling and evaluating the effects of ecological, socio-economic consequences resulting from the implementation of the proposed management plans on the vegetation changes with a focus on the problems in Simindasht catchment, located in Semnan and Tehran Provinces. After standardization of indices by distance method and weighing them, the scenarios were prioritized using multi-criteria decision-making technique. Trade-off analysis of the results indicates that in the integrated management of Simindasht catchment more than one single management solution, covering all aspects of the system can be recommended in different weighting approaches. The approach used herein, considering the results of different models and comparing the results, is an efficient tool to represent the watershed system as a whole and to facilitate decision making for integrated watershed management.

  18. Integrating management tools and concepts to develop an estuarine planning support system: A case study of the Humber Estuary, Eastern England.

    Science.gov (United States)

    Lonsdale, Jemma-Anne; Weston, Keith; Barnard, Steve; Boyes, Suzanne J; Elliott, Michael

    2015-11-15

    Estuaries are important because of their multiple uses and users which often makes them challenging to manage since management must strike a balance between the needs of users, the estuaries' ecological and economic value and the context of multiple legislative drivers. To facilitate management we have therefore developed an Estuarine Planning Support System (EPSS) framework using the Humber Estuary, Eastern England, as a case study which integrates the current legislation tools and concepts. This integrated EPSS framework is an improvement on previous approaches for assessing cumulative impacts as it takes into account legislative drivers, management tools and other mechanisms for controlling plans/projects specific to the estuary. It therefore enables managers and users to assess and address both the current state and the way in which a new industrial, port or urban development could impact an estuary in an accessible and understandable framework. Crown Copyright © 2015. Published by Elsevier Ltd. All rights reserved.

  19. SELECTED REQUIREMENTS OF INTEGRATED MANAGEMENT SYSTEMS BASED ON PAS 99 SPECIFICATION

    Directory of Open Access Journals (Sweden)

    Paweł Nowicki

    2013-03-01

    Full Text Available The aim this research was to analyze the ways of integration of management systems in food sector. The study involved the documentation, audits, corrective and preventive actions and management's review phases described in the specification PAS 99, which is one of common elements of integrated management systems. Four organizations were selected for the study. The organizations had introduced and certified at least two standardized management systems. It was assumed that the investigated organizations should have implemented the HACCP system. Studies were conducted as a case study. The employees responsible for the functioning of management systems were interviewed in all four organizations. The study was conducted in the form of in-depth interviews based on pre-prepared script. The scenario was developed based on the PAS 99 guideline. The process of integration of management systems implemented in the studied companies reveals the full compliance of an integrated management system with PASS 99 in the policy area.

  20. An analysis of the perceived difficulties arising during the process of integrating management systems

    Directory of Open Access Journals (Sweden)

    Jesus Abad

    2016-09-01

    Originality/value: Most research emphasises the benefits of integrated management systems. By analysing the difficulties that arise during the integration process, this study contributes to fill a gap in the literature on the problems associated with processes of organisational change, in our case the integration of management systems.

  1. SYSTEMS FOR IMPROVEMENT OF BUSINESS INTEGRATED MANAGEMENT PROCESSES IN PORTS

    Directory of Open Access Journals (Sweden)

    Pavle Popovic

    2017-03-01

    Full Text Available Based on test results obtained so far, the objective relating to modern scientific methods and approaches has been defined with the intention to develop model which defines new management system integration model, by adopting necessary practical terms of real systems that most frequently circulate in maritime practice in the field of integrated management systems (IMS in terms of safety and security of vessels and ports. The subject of research is maritime, particularly port services, by way of defining internal and external advantages through adopting integrated management systems. The research will be conducted through theoretical and applied assessments of case study analyses using example of the Port of Kotor H.Co.

  2. Towards adaptive and integrated management paradigms to meet the challenges of water governance.

    Science.gov (United States)

    Halbe, J; Pahl-Wostl, C; Sendzimir, J; Adamowski, J

    2013-01-01

    Integrated Water Resource Management (IWRM) aims at finding practical and sustainable solutions to water resource issues. Research and practice have shown that innovative methods and tools are not sufficient to implement IWRM - the concept needs to also be integrated in prevailing management paradigms and institutions. Water governance science addresses this human dimension by focusing on the analysis of regulatory processes that influence the behavior of actors in water management systems. This paper proposes a new methodology for the integrated analysis of water resources management and governance systems in order to elicit and analyze case-specific management paradigms. It builds on the Management and Transition Framework (MTF) that allows for the examination of structures and processes underlying water management and governance. The new methodology presented in this paper combines participatory modeling and analysis of the governance system by using the MTF to investigate case-specific management paradigms. The linking of participatory modeling and research on complex management and governance systems allows for the transfer of knowledge between scientific, policy, engineering and local communities. In this way, the proposed methodology facilitates assessment and implementation of transformation processes towards IWRM that require also the adoption of adaptive management principles. A case study on flood management in the Tisza River Basin in Hungary is provided to illustrate the application of the proposed methodology.

  3. Integrated production planning and water management in the food industry: A cheese production case study

    NARCIS (Netherlands)

    Pulluru, Sai Jishna; Akkerman, Renzo; Hottenrott, Andreas

    2017-01-01

    Efficient water management is increasingly relevant in the food industry. Exploiting water reuse opportunities in planning production activities is a key part of this. We study integrated water management and production planning in cheese production. For this, we develop a water-integrated lot

  4. Systematic literature review of integrated community case management and the private sector in Africa: Relevant experiences and potential next steps.

    Science.gov (United States)

    Awor, Phyllis; Miller, Jane; Peterson, Stefan

    2014-12-01

    Despite substantial investments made over the past 40 years in low income countries, governments cannot be viewed as the principal health care provider in many countries. Evidence on the role of the private sector in the delivery of health services is becoming increasingly available. In this study, we set out to determine the extent to which the private sector has been utilized in providing integrated care for sick children under 5 years of age with community-acquired malaria, pneumonia or diarrhoea. We reviewed the published literature for integrated community case management (iCCM) related experiences within both the public and private sector. We searched PubMed and Google/Google Scholar for all relevant literature until July 2014. The search terms used were "malaria", "pneumonia", "diarrhoea", "private sector" and "community case management". A total of 383 articles referred to malaria, pneumonia or diarrhoea in the private sector. The large majority of these studies (290) were only malaria related. Most of the iCCM-related studies evaluated introduction of only malaria drugs and/or diagnostics into the private sector. Only one study evaluated the introduction of drugs and diagnostics for malaria, pneumonia and diarrhoea in the private sector. In contrast, most iCCM-related studies in the public sector directly reported on community case management of 2 or more of the illnesses. While the private sector is an important source of care for children in low income countries, little has been done to harness the potential of this sector in improving access to care for non-malaria-associated fever in children within the community. It would be logical for iCCM programs to expand their activities to include the private sector to achieve higher population coverage. An implementation research agenda for private sector integrated care of febrile childhood illness needs to be developed and implemented in conjunction with private sector intervention programs.

  5. Integrated water resources management (IWRM) approach in water governance in Lao PDR. Cases of hydropower and irrigation

    Energy Technology Data Exchange (ETDEWEB)

    Jusi, S.

    2013-06-01

    Water resources are essential for socio-economic development, enabling, for example, hydropower and irrigation. Water resources management and development are expected to become more complex and challenging and to involve new uncertainties as water development increases and accelerates in different water use sectors and is coupled with increasing population, urbanisation, and climate change. Hence, water resources need to be managed in more integrated and sustainable way, both in Lao PDR and in the whole Mekong Basin area. Integrated Water Resources Management (IWRM) has become a universal paradigm of enhancing and promoting sustainable and equal water resources management and use. However, integrating water functions is a very complex task as it involves many actors with different interests. This research analyses the application of the IWRM approach and the related principles of integration, decentralisation, and participation in the development and management of water resources in Laotian water regime at the water use sectors of hydropower and irrigation. A case study approach was used for the research and for the four appended articles in order to examine hydropower and irrigation sectors, institutional structures, and processes of institutional change - Integrated Water Resources Management (IWRM) at constitutional, organisational, and operational levels. The constitutional level refers to water policy and law, organisational to water resource management, and operational to water use. The Management and Transition Framework (MTF) and one of its components, Institutional Analysis and Development (IAD) framework, have been used for the research to explore processes, institutions, and actors related to water governance reforms including the adoption of the IWRM paradigm, and to increase understanding of the strengths and weaknesses related to different institutional contexts and levels in Laotian water management. Through Action Situations, IAD and MTF have

  6. Is emergency management an integrated element of business continuity management? A case study with security professionals in Western Australia.

    Science.gov (United States)

    Frohde, Kenny; Brooks, David J

    Emergency management (EM) and business continuity management (BCM) frameworks incorporate various strategic and operational measures. Defined within a number of national and international standards and guidelines, such concepts may be integrated within one another to provide increased resilience to disruptive events. Nevertheless, there is a degree of dispute regarding concept integration among security and EM professionals and bodies of knowledge. In line with cognitive psychology exemplar-based concepts, such disputes may be associated with a lack of precision in communality in the approach to EM and BCM. This paper presents a two-stage study, where stage 1 critiqued national and international literature and stage 2 applied semi-structured interviews with security managers in Western Australia. Findings indicate the existence of contradictory views on EM and its integration within BCM. As such, this study concludes that EM is considered a vital component of BCM by the majority of security managers. However, there is broader dispute regarding its degree of integration. Understanding the underpinnings of such disputes will aid in raising the standards and application of professionalism within security, EM and BCM domains, supporting clarification and definition of professional boundaries.

  7. Information Security Management - Part Of The Integrated Management System

    Science.gov (United States)

    Manea, Constantin Adrian

    2015-07-01

    The international management standards allow their integrated approach, thereby combining aspects of particular importance to the activity of any organization, from the quality management systems or the environmental management of the information security systems or the business continuity management systems. Although there is no national or international regulation, nor a defined standard for the Integrated Management System, the need to implement an integrated system occurs within the organization, which feels the opportunity to integrate the management components into a cohesive system, in agreement with the purpose and mission publicly stated. The issues relating to information security in the organization, from the perspective of the management system, raise serious questions to any organization in the current context of electronic information, reason for which we consider not only appropriate but necessary to promote and implement an Integrated Management System Quality - Environment - Health and Operational Security - Information Security

  8. An adaptive case management system to support integrated care services: Lessons learned from the NEXES project.

    Science.gov (United States)

    Cano, Isaac; Alonso, Albert; Hernandez, Carme; Burgos, Felip; Barberan-Garcia, Anael; Roldan, Jim; Roca, Josep

    2015-06-01

    Extensive deployment and sustainability of integrated care services (ICS) constitute an unmet need to reduce the burden of chronic conditions. The European Union project NEXES (2008-2013) assessed the deployment of four ICS encompassing the spectrum of severity of chronic patients. The current study aims to (i) describe the open source Adaptive Case Management (ACM) system (Linkcare®) developed to support the deployment of ICS at the level of healthcare district; (ii) to evaluate its performance; and, (iii) to identify key challenges for regional deployment of ICS. We first defined a conceptual model for ICS management and execution composed of five main stages. We then specified an associated logical model considering the dynamic runtime of ACM. Finally, we implemented the four ICS as a physical model with an ICS editor to allow professionals (case managers) to play active roles in adapting the system to their needs. Instances of ICS were then run in Linkcare®. Four ICS provided a framework for evaluating the system: Wellness and Rehabilitation (W&R) (number of patients enrolled in the study (n)=173); Enhanced Care (EC) in frail chronic patients to prevent hospital admissions, (n=848); Home Hospitalization and Early Discharge (HH/ED) (n=2314); and, Support to remote diagnosis (Support) (n=7793). The method for assessment of telemedicine applications (MAST) was used for iterative evaluation. Linkcare® supports ACM with shared-care plans across healthcare tiers and offers integration with provider-specific electronic health records. Linkcare® successfully contributed to the deployment of the four ICS: W&R facilitated long-term sustainability of training effects (p<0.01) and active life style (p<0.03); EC showed significant positive outcomes (p<0.05); HH/ED reduced on average 5 in-hospital days per patient with a 30-d re-admission rate of 10%; and, Support, enhanced community-based quality forced spirometry testing (p<0.01). Key challenges for regional deployment

  9. Communication in ecosystem management: a case study of cross-disciplinary integration in the assessment phase of the interior Columbia Basin Ecosystem Management Project.

    Science.gov (United States)

    Jakobsen, Christine Haugaard; McLaughlin, William J

    2004-05-01

    Effective communication is essential to the success of collaborative ecosystem management projects. In this paper, we investigated the dynamics of the Interior Columbia Basin Ecosystem Management Project's (ICBEMP) cross-disciplinary integration process in the assessment phase. Using a case study research design, we captured the rich trail of experience through conducting in-depth interviews and collecting information from internal and public documents, videos, and meetings related to the ICBEMP. Coding and analysis was facilitated by a qualitative analysis software, NVivo. Results include the range of internal perspectives on barriers and facilitators of cross-disciplinary integration in the Science Integration Team (SIT). These are arrayed in terms of discipline-based differences, organizational structures and activities, individual traits of scientists, and previous working relationships. The ICBEMP organization included a team of communication staffs (CT), and the data described the CT as a mixed group in terms of qualifications and educational backgrounds that played a major role in communication with actors external to the ICBEMP organization but a minor one in terms of internal communication. The data indicated that the CT-SIT communication was influenced by characteristics of actors and structures related to organizations and their cultures. We conclude that the ICBEMP members may not have had a sufficient level of shared understanding of central domains, such as the task at hand and ways and timing of information sharing. The paper concludes by suggesting that future ecosystem management assessment teams use qualified communications specialists to design and monitor the development of shared cognition among organization members in order to improve the effectiveness of communication and cross-disciplinary integration.

  10. Sustainable energy development as an integral part of hydroelectric business management

    International Nuclear Information System (INIS)

    Lee, W.; Yu, M.; Young, C.

    1996-01-01

    Elements of Ontario Hydro's strategy for sustainable energy development were discussed, highlighting key developments in the business management practices in Ontario Hydro's Hydroelectric Business Unit. Sustainable development considerations are now integral part of any business case analysis; management of the environment also has been integrated into the Utilities' business management process. Several environmental management practices intended to enhance sustainability have been introduced, including a full-fledged environmental management system based on ISO 14001 standards. Energy efficiency opportunities are aggressively pursued, including turbine upgrades, and energy efficient lighting. Experience to date indicates that business performance and progress towards sustainable energy development need not be mutually exclusive

  11. Case management services for work related upper extremity disorders. Integrating workplace accommodation and problem solving.

    Science.gov (United States)

    Shaw, W S; Feuerstein, M; Lincoln, A E; Miller, V I; Wood, P M

    2001-08-01

    A case manager's ability to obtain worksite accommodations and engage workers in active problem solving may improve health and return to work outcomes for clients with work related upper extremity disorders (WRUEDs). This study examines the feasibility of a 2 day training seminar to help nurse case managers identify ergonomic risk factors, provide accommodation, and conduct problem solving skills training with workers' compensation claimants recovering from WRUEDs. Eight procedural steps to this case management approach were identified, translated into a training workshop format, and conveyed to 65 randomly selected case managers. Results indicate moderate to high self ratings of confidence to perform ergonomic assessments (mean = 7.5 of 10) and to provide problem solving skills training (mean = 7.2 of 10) after the seminar. This training format was suitable to experienced case managers and generated a moderate to high level of confidence to use this case management approach.

  12. Integrating fire management analysis into land management planning

    Science.gov (United States)

    Thomas J. Mills

    1983-01-01

    The analysis of alternative fire management programs should be integrated into the land and resource management planning process, but a single fire management analysis model cannot meet all planning needs. Therefore, a set of simulation models that are analytically separate from integrated land management planning models are required. The design of four levels of fire...

  13. Pipeline integrity management

    Energy Technology Data Exchange (ETDEWEB)

    Guyt, J.; Macara, C.

    1997-12-31

    This paper focuses on some of the issues necessary for pipeline operators to consider when addressing the challenge of managing the integrity of their systems. Topics are: Definition; business justification; creation and safeguarding of technical integrity; control and deviation from technical integrity; pipelines; pipeline failure assessment; pipeline integrity assessment; leak detection; emergency response. 6 figs., 3 tabs.

  14. Integrating mobile technology with routine dietetic practice: the case of myPace for weight management.

    Science.gov (United States)

    Harricharan, Michelle; Gemen, Raymond; Celemín, Laura Fernández; Fletcher, David; de Looy, Anne E; Wills, Josephine; Barnett, Julie

    2015-05-01

    The field of Mobile health (mHealth), which includes mobile phone applications (apps), is growing rapidly and has the potential to transform healthcare by increasing its quality and efficiency. The present paper focuses particularly on mobile technology for body weight management, including mobile phone apps for weight loss and the available evidence on their effectiveness. Translation of behaviour change theory into weight management strategies, including integration in mobile technology is also discussed. Moreover, the paper presents and discusses the myPace platform as a case in point. There is little clinical evidence on the effectiveness of currently available mobile phone apps in enabling behaviour change and improving health-related outcomes, including sustained body weight loss. Moreover, it is unclear to what extent these apps have been developed in collaboration with health professionals, such as dietitians, and the extent to which apps draw on and operationalise behaviour change techniques has not been explored. Furthermore, presently weight management apps are not built for use as part of dietetic practice, or indeed healthcare more widely, where face-to-face engagement is fundamental for instituting the building blocks for sustained lifestyle change. myPace is an innovative mobile technology for weight management meant to be embedded into and to enhance dietetic practice. Developed out of systematic, iterative stages of engagement with dietitians and consumers, it is uniquely designed to complement and support the trusted health practitioner-patient relationship. Future mHealth technology would benefit if engagement with health professionals and/or targeted patient groups, and behaviour change theory stood as the basis for technology development. Particularly, integrating technology into routine health care practice, rather than replacing one with the other, could be the way forward.

  15. Case Studies, Ethics, Philosophy, and Liberal Learning for the Management Profession

    Science.gov (United States)

    Rendtorff, Jacob Dahl

    2015-01-01

    Case studies can be an important methodology for ethics and philosophy in humanistic management and liberal education as well as in the social sciences because they integrate a deeper, reflective, philosophical, and ethical understanding of the organization. A case study approach based on philosophy of management contributes to putting into…

  16. Development and improvement of the integrated system of management

    Directory of Open Access Journals (Sweden)

    Lukmanova Inessa Galeevna

    2014-07-01

    Full Text Available Integrated management system construction can be considered a way that transforms using business processes and information resources into final construction products. Autonomous system of quality management, environmental, health and safety organizations introduction usually lead to the accumulation of duplicate documents, which increase the time spent on processing and analysis as well as increase the financial costs of maintaining the operation of each of them separately. System integration allows reducing these costs and entailing the most obvious benefits: reduced volumes of documents; reduction of time spent on analysis; reducing the cost of audit and certification; involvement of all the employees of the organization; productivity growth; increasing the attractiveness for consumers; reducing the burden on administrative and executive devices; ensuring a high level of flexibility in the organization's management system in case of internal and external changes. Integration of quality management systems, environmental management and safety management systems, production and safety led to the possibility to establish such integrated management system in developing building companies, which allows establishing a unified management system, as an element of management of organization. The main drawback of the currently used standards and specifications is the lack of flexibility of their application, as well as the basic principles and approaches to their implementation. Thus, knowing about what the system should be, but not knowing how to create it, many organizations have to operate without methodological support. Absence of mandatory standards concerning integration of management systems creates opportunities for the existence of multiple options for interaction systems. Economic effects on the integrated management system is formed from three sources: the reduction of production costs by improving product quality and reducing defects and

  17. Science of Integrated Approaches to Natural Resources Management

    Science.gov (United States)

    Tengberg, Anna; Valencia, Sandra

    2017-04-01

    To meet multiple environmental objectives, integrated programming is becoming increasingly important for the Global Environmental Facility (GEF), the financial mechanism of the multilateral environmental agreements, including the United Nations Convention to Combat Desertification (UNCCD). Integration of multiple environmental, social and economic objectives also contributes to the achievement of the Sustainable Development Goals (SDGs) in a timely and cost-effective way. However, integration is often not well defined. This paper therefore focuses on identifying key aspects of integration and assessing their implementation in natural resources management (NRM) projects. To that end, we draw on systems thinking literature, and carry out an analysis of a random sample of GEF integrated projects and in-depth case studies demonstrating lessons learned and good practices in addressing land degradation and other NRM challenges. We identify numerous challenges and opportunities of integrated approaches that need to be addressed in order to maximise the catalytic impact of the GEF during problem diagnosis, project design, implementation and governance. We highlight the need for projects to identify clearer system boundaries and main feedback mechanisms within those boundaries, in order to effectively address drivers of environmental change. We propose a theory of change for Integrated Natural Resources Management (INRM) projects, where short-term environmental and socio-economic benefits will first accrue at the local level. Implementation of improved INRM technologies and practices at the local level can be extended through spatial planning, strengthening of innovation systems, and financing and incentive mechanisms at the watershed and/or landscape/seascape level to sustain and enhance ecosystem services at larger scales and longer time spans. We conclude that the evolving scientific understanding of factors influencing social, technical and institutional innovations and

  18. Case Studies, Ethics, Philosophy and Liberal Learning for the Management Profession

    DEFF Research Database (Denmark)

    Rendtorff, Jacob Dahl

    2015-01-01

    Case studies can be an important methodology for ethics and philosophy in humanistic management and liberal education as well as in the social sciences because they integrate a deeper, reflective, philosophical, and ethical understanding of the organization. A case study approach based...... on philosophy of management contributes to putting into practice the Carnegie Foundation report Rethinking Undergraduate Education: Liberal Learning for the Profession. This approach is both inductive and deductive and very different from a soft Socratic approach to case studies such as the one often used...... in business schools following the Harvard method, wherein students are supposed to get knowledge through the reading of a case prepared by the teacher or from a business textbook. The aim of the case study is to analyze a concrete case and get general knowledge through the integrated analysis of the different...

  19. Integrating strategic environmental assessment with industry planning: a case study of the Pasquai-Porcupine forest management plan, Saskatchewan, Canada.

    Science.gov (United States)

    Noble, Bram F

    2004-03-01

    Strategic environmental assessment (SEA) is gaining widespread recognition as a tool for integrating environmental considerations in policy, plan, and program development and decision-making. Notwithstanding the potential of SEA to improve higher-order decision processes, there has been very little attention given to integrating SEA with industry planning practices. As a result, the benefits of SEA have yet to be fully realized among industrial proponents. That said, SEA practice is ongoing, albeit informally and often under a different label, and is proving to be a valuable tool for industry planning and decision-making. Based on a case study of the Pasquai-Porcupine forest management plan in Saskatchewan, Canada, this paper illustrates how an integrated approach to SEA can contribute to industry environmental decision-making and can enhance the quality and deliverability of industry plans.

  20. Integrated data management for RODOS

    International Nuclear Information System (INIS)

    Abramowicz, K.; Koschel, A.; Rafat, M.; Wendelgass, R.

    1995-12-01

    The report presents the results of a feasibility study on an integrated data organisation and management in RODOS, the real-time on-line decision support system for off-site nuclear emergency management. The conceptual design of the functional components of the integrated data management are described taking account of the software components and the operation environment of the RODOS system. In particular, the scheme architecture of a database integration manager for accessing and updating a multi-database system is discussed in detail under a variety of database management aspects. Furthermore, the structural design of both a simple knowledge database and a real-time database are described. Finally, some short comments on the benefits and disadvantages of the proposed concept of data integration in RODOS are given. (orig.) [de

  1. Policy challenges facing integrated community case management in Sub-Saharan Africa.

    Science.gov (United States)

    Bennett, Sara; George, Asha; Rodriguez, Daniela; Shearer, Jessica; Diallo, Brahima; Konate, Mamadou; Dalglish, Sarah; Juma, Pamela; Namakhoma, Ireen; Banda, Hastings; Chilundo, Baltazar; Mariano, Alda; Cliff, Julie

    2014-07-01

    To report an in-depth analysis of policy change for integrated community case management of childhood illness (iCCM) in six sub-Saharan African countries. We analysed how iCCM policies developed and the barriers and facilitators to policy change. Qualitative retrospective case studies drawing from document reviews, semi-structured interviews and in-country validation workshops were conducted in Burkina Faso, Kenya, Malawi, Mali, Mozambique and Niger. These countries were selected to maximise variation in iCCM policy status, community health worker (CHW) models and different African regions. Country iCCM policies evolved in an ad hoc fashion, but were substantially influenced by the history of primary health care and the nature of CHW programmes. Technical officers within Ministries of Health led iCCM policy change with support from international donors, but neither communities nor political leadership was mobilised. Concerns about achieving the Millennium Development Goals, together with recognition of the shortcomings of existing child health programmes, led to the adoption of iCCM policies. Availability of external financing played a critical role in facilitating policy change. iCCM policy change has been promoted by international agencies, but national governments have struggled to align iCCM with country health systems. Greater investment is needed in tailoring global policy initiatives to match country needs. High-level, political ownership of iCCM policies could facilitate policy change, as could clearer strategies for ensuring the long-term sustainability of such policies. © 2014 The Authors. Tropical Medicine & International Health Published by John Wiley & Sons Ltd.

  2. The case and opportunity for public-supported financial incentives to implement integrated pest management.

    Science.gov (United States)

    Brewer, Michael J; Hoard, Robert J; Landis, Joy N; Elworth, Lawrence E

    2004-12-01

    Food, water, and worker protection regulations have driven availability, and loss, of pesticides for use in pest management programs. In response, public-supported research and extension projects have targeted investigation and demonstration of reduced-risk integrated pest management (IPM) techniques. But these new techniques often result in higher financial burden to the grower, which is counter to the IPM principle that economic competitiveness is critical to have IPM adopted. As authorized by the 2002 Farm Bill and administered by the U.S. Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS), conservation programs exist for delivering public-supported financial incentives to growers to increase environmental stewardship on lands in production. NRCS conservation programs are described, and the case for providing financial incentives to growers for implementing IPM is presented. We also explored the opportunity and challenge to use one key program, the Environmental Quality Incentives Program (EQIP), to aid grower adoption of IPM. The EQIP fund distribution to growers from 1997 to 2002 during the last Farm Bill cycle totaled approximately 1.05 billion dollars with a portion of funds supporting an NRCS-designed pest management practice. The average percentage of allocation of EQIP funds to this pest management practice among states was 0.77 +/- 0.009% (mean +/- SD). Using Michigan as an example, vegetable and fruit grower recognition of the program's use to implement IPM was modest (25% of growers surveyed), and their recognition of its use in aiding implementation of IPM was improved after educational efforts (74%). Proposals designed to enhance program usefulness in implementing IPM were delivered through the NRCS advisory process in Michigan. Modifications for using the NRCS pest management practice to address resource concerns were adopted, incentive rates for pest management were adjusted, and an expanded incentive structure for IPM

  3. Managing the Social Determinants of Health: Part I: Fundamental Knowledge for Professional Case Management.

    Science.gov (United States)

    Fink-Samnick, Ellen

    PRIMARY PRACTICE SETTING(S):: Applicable to health and behavioral health settings, wherever case management is practiced. The SDH pose major challenges to the health care workforce in terms of effective resource provision, health and behavioral health treatment planning plus adherence, and overall coordination of care. Obstacles and variances to needed interventions easily lead to less than optimal outcomes for case managers and their health care organizations. Possessing sound knowledge and clear understanding of each SDH, the historical perspectives, main theories, and integral dynamics, as well as creative resource solutions, all support a higher level of intentional and effective professional case management practice. Those persons and communities impacted most by the SDH comprise every case management practice setting. These clients can be among the most vulnerable and disenfranchised members of society, which can easily engender biases on the part of the interprofessional workforce. They are also among the costliest to care for with 50% of costs for only 5% of the population. Critical attention to knowledge about managing the SDH leverages and informs case management practice, evolves more effective programming, and enhances operational outcomes across practice settings.

  4. Inspired moments - Possibilities beyond management through integral coaching

    Directory of Open Access Journals (Sweden)

    J. M.C. Everson

    2006-12-01

    Full Text Available Purpose: The primary purpose of this paper is to investigate whether an integral coaching intervention underway in a multinational, fast-moving consumer goods organisation can support the creation of an environment that encourages new ways of thinking and learning. This would be underpinned by increased self-understanding amongst leaders and managers. Such self-awareness is argued to lead to enhanced relationships within the workplace for both managers and their subordinates. Design/Methodology/Approach: A qualitative research methodology was adopted using the grounded theory approach to data analysis. Open coding was utilised to identify the emergent themes. These themes were in some cases self-reported and in other cases reported by middle management on the changes noted in the behaviour of senior management. The research findings are based on a high internal generalisability as the sample was drawn from a cross-functional sample. Because this survey was carried out within a single organisation, these results lack external generalisability. Findings: Firstly, the individual managers themselves express a greater sense of commitment, fairness and purpose both from each other and their line managers. Secondly, managers claim an improved ability to delegate, trust, communicate, and to operate effectively in team contexts resulting in improved team and cross-functional dynamics. The final impact observed was a shift in the cohesion, freedom and openness to diverse inputs in the organisation. Implications: This research highlights the key contribution that integral coaching can make in helping managers see beyond the limitations of traditional management towards the inspiring possibilities of powerful conversations and human connections in the workplace. Originality/Value: Whilst the results of this paper are specific only to the South African organisation under study, the research nevertheless shows a strong direct link between a coaching

  5. [Management, quality of health and occupational safety and hospital organization: is integration possible?].

    Science.gov (United States)

    Corrao, Carmela Romana Natalina

    2011-01-01

    The evolution of the national and European legislation has progressively transformed the working environments into organized environments. Specific models for its management are being proposed, which should be integrated into general management strategies. In the case of hospitals this integration should consider the peculiar organizational complexity, where the management of the occupational risk needs to be integrated with clinical risk management and economic risk management. Resources management should also consider that Occupational Medicine has not a direct monetary benefit for the organisation, but only indirect health consequences in terms of reduction of accidents and occupational diseases. The deep and simultaneous analysis of the current general management systems and the current management methods of occupational safety and health protection allows one to hyphotesise a possible integration between them. For both of them the Top Management is the main responsible of the quality management strategies and the use of specific documents in the managerial process, such as the document of risks evaluation in the occupational management and the quality manual in the general management, is of paramount importance. An integrated management has also the scope to pursue a particular kind of quality management, where ethics and job satisfaction are innovative, as established by recent European guidelines, management systems and national legislations.

  6. Integrated Work Management: Overview, Course 31881

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Lewis Edward [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-06-30

    Integrated work management (IWM) is the process used for formally implementing the five-step process associated with integrated safety management (ISM) and integrated safeguards and security management (ISSM) at Los Alamos National Laboratory (LANL). IWM also directly supports the LANL Environmental Management System (EMS). IWM helps all workers and managers perform work safely and securely and in a manner that protects people, the environment, property, and the security of the nation. The IWM process applies to all work activities at LANL, from working in the office to designing experiments to assembling and detonating explosives. The primary LANL document that establishes and describes IWM requirements is Procedure (P) 300, Integrated Work Management.

  7. The Origin and Constitution of Facilities Management as an integrated corporate fuction

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2008-01-01

    Purpose – To understand how facilities management (FM) has evolved over time in a complex public corporation from internal functions of building operation and building client and the related service functions to become an integrated corporate function. Design/methodology/approach – The paper...... is based on results from a research project on space strategies and building values, which included a major longitudinal case study of the development of facilities for the Danish Broadcasting Corporation (DR) over time. The research presented here included literature studies, archive studies...... and a fully integrated corporate Facilities Management function are established. Research limitations/implications – The paper presents empirical evidence of the historical development ofFMfrom one case and provides a deeper understanding of the integration processes that are crucial to FM and which can...

  8. Collaborations in leadership: the nurse case management and nursing administration connection.

    Science.gov (United States)

    Carr, Dana Deravin

    2009-01-01

    With a multiple decade's long surge in managed care and the growth of case management as a profession, there is increasing recognition of the leadership role that case managers employ daily as they coordinate and facilitate patient-centered initiatives. Now, more than ever, case managers are being called upon to further expand their leadership capabilities and take a more active role in professional partnering to ensure the continued attainment of clinical, fiscal, and quality outcomes. All settings, particularly acute care hospitals and integrated delivery systems. The collaboration between nurse case managers and nursing administration provides a framework for the establishment of a collegial and supportive working relationship: one that is built on the strength of mutual goals, shared leadership abilities, respect, and professional loyalty.

  9. Case management after long-term absence from work in China: a case report.

    Science.gov (United States)

    Tang, Dan; Yu, Ignatius Tak Sun; Luo, Xiaoyuan; Liang, Youxin; He, Yonghua

    2011-03-01

    Return-to-work (RTW) after occupational injuries is an important and challenging issue. Case managers are expected to play a vital role in successful RTW. In China, RTW intervention is in its early phase and requires further research and practice. This case report describes Mr. H's RTW process for illustrating the work of a case management team in China. Suggestions on developing and optimizing the process in China are given. After 9 years of absence from work due to severe burn injuries at work, Mr. H was referred for RTW interventions. Mr. H received social and occupational rehabilitation services of 3 months, and the following workplace visits and work trials. After the job placement, the case manager continued the liaison with the worker and employer. Mr. H showed positive changes in occupational and social adjustment after the case management interventions. This was reflected from the shift from the contemplation to action stage on the Lam Assessment of Stages of Employment Readiness. Despite he did not show significant changes on functional capacity and fear avoidance beliefs, Mr. H passed the job credential test and was offered a maintenance technician position at a new company. Both the worker and the employer were satisfied with the outcome of the case management. The RTW interventions carried out by the case managers appeared to be effective within the Chinese system. The results suggested that professional training of case managers, RTW-related policies and technological standards, early integrated interventions should be further developed in China. Disability Adjustment Group Therapy and RTW Support Groups perhaps are useful approaches in workers' returning to work.

  10. The nexus between integrated natural resources management and integrated water resources management in southern Africa

    Science.gov (United States)

    Twomlow, Stephen; Love, David; Walker, Sue

    The low productivity of smallholder farming systems and enterprises in the drier areas of the developing world can be attributed mainly to the limited resources of farming households and the application of inappropriate skills and practices that can lead to the degradation of the natural resource base. This lack of development, particularly in southern Africa, is of growing concern from both an agricultural and environmental perspective. To address this lack of progress, two development paradigms that improve land and water productivity have evolved, somewhat independently, from different scientific constituencies. One championed by the International Agricultural Research constituency is Integrated Natural Resource Management (INRM), whilst the second championed predominantly by Environmental and Civil Engineering constituencies is Integrated Water Resources Management (IWRM). As a result of similar objectives of working towards the millennium development goals of improved food security and environmental sustainability, there exists a nexus between the constituencies of the two paradigms, particularly in terms of appreciating the lessons learned. In this paper lessons are drawn from past INRM research that may have particular relevance to IWRM scientists as they re-direct their focus from blue water issues to green water issues, and vice-versa. Case studies are drawn from the management of water quality for irrigation, green water productivity and a convergence of INRM and IWRM in the management of gold panning in southern Zimbabwe. One point that is abundantly clear from both constituencies is that ‘one-size-fits-all’ or silver bullet solutions that are generally applicable for the enhancement of blue water management/formal irrigation simply do not exist for the smallholder rainfed systems.

  11. Case management for at-risk elderly patients in the English integrated care pilots: observational study of staff and patient experience and secondary care utilisation

    Directory of Open Access Journals (Sweden)

    Martin Roland

    2012-07-01

    Full Text Available Introduction: In 2009, the English Department of Health appointed 16 integrated care pilots which aimed to provide better integrated care. We report the quantitative results from a multi-method evaluation of six of the demonstration projects which used risk profiling tools to identify older people at risk of emergency hospital admission, combined with intensive case management for people identified as at risk. The interventions focused mainly on delivery system redesign and improved clinical information systems, two key elements of Wagner's Chronic Care Model.Methods: Questionnaires to staff and patients. Difference-in-differences analysis of secondary care utilisation using data on 3,646 patients and 17,311 matched controls, and changes in overall secondary care utilisation.Results: Most staff thought that care for their patients had improved. More patients reported having a care plan but they found it significantly harder to see a doctor or nurse of their choice and felt less involved in decisions about their care. Case management interventions were associated with a 9% increase in emergency admissions. We found some evidence of imbalance between cases and controls which could have biased this estimate, but simulations of the possible effect of unobserved confounders showed that it was very unlikely that the sites achieved their goal of reducing emergency admissions. However, we found significant reductions of 21% and 22% in elective admissions and outpatient attendance in the six months following an intervention, and overall inpatient and outpatient costs were significantly reduced by 9% during this period. Area level analyses of whole practice populations suggested that overall outpatient attendances were significantly reduced by 5% two years after the start of the case management schemes.Conclusion: Case management may result in improvements in some aspects of care and has the potential to reduce secondary care costs. However, to improve

  12. Supporting Facility Management Processes through End-Users’ Integration and Coordinated BIM-GIS Technologies

    Directory of Open Access Journals (Sweden)

    Claudio Mirarchi

    2018-05-01

    Full Text Available The integration of facility management and building information modelling (BIM is an innovative and critical undertaking process to support facility maintenance and management. Even though recent research has proposed various methods and performed an increasing number of case studies, there are still issues of communication processes to be addressed. This paper presents a theoretical framework for digital systems integration of virtual models and smart technologies. Based on the comprehensive analysis of existing technologies for indoor localization, a new workflow is defined and designed, and it is utilized in a practical case study to test the model performance. In the new workflow, a facility management supporting platform is proposed and characterized, featuring indoor positioning systems to allow end users to send geo-referenced reports to central virtual models. In addition, system requirements, information technology (IT architecture and application procedures are presented. Results show that the integration of end users in the maintenance processes through smart and easy tools can overcome the existing limits of barcode systems and building management systems for failure localization. The proposed framework offers several advantages. First, it allows the identification of every element of an asset including wide physical building elements (walls, floors, etc. without requiring a prior mapping. Second, the entire cycle of maintenance activities is managed through a unique integrated system including the territorial dimension. Third, data are collected in a standard structure for future uses. Furthermore, the integration of the process in a centralized BIM-GIS (geographical information system information management system admit a scalable representation of the information supporting facility management processes in terms of assets and supply chain management and monitoring from a spatial perspective.

  13. Integrated and Adaptive Management of Water Resources: Tensions, Legacies, and the Next Best Thing

    Directory of Open Access Journals (Sweden)

    Nathan L. Engle

    2011-03-01

    Full Text Available Integrated water resources management (IWRM and adaptive management (AM are two institutional and management paradigms designed to address shortcomings within water systems governance; the limits of hierarchical water institutional arrangements in the case of IWRM and the challenge of making water management decisions under uncertainty in the case of AM. Recently, there has been a trend to merge these paradigms to address the growing complexity of stressors shaping water management such as globalization and climate change. However, because many of these joint approaches have received little empirical attention, questions remain about how they might work, or not, in practice. Here, we explore a few of these issues using empirical research carried out in Brazil. We focus on highlighting the potentially negative interactions, tensions, and trade-offs between different institutions/mechanisms perceived as desirable as research and practice attempt to make water systems management simultaneously integrated and adaptive. Our examples pertain mainly to the use of techno-scientific knowledge in water management and governance in Brazil's IWRM model and how it relates to participation, democracy, deliberation, diversity, and adaptability. We show that a legacy of technical and hierarchical management has shaped the integration of management, and subsequently, the degree to which management might also be adaptive. Although integrated systems may be more legitimate and accountable than top-down command and control ones, the mechanisms of IWRM may be at odds with the flexible, experimental, and self-organizing nature of AM.

  14. Improving environmental impact assessmentfor better integrated coastal zone management

    NARCIS (Netherlands)

    Tiwi, D.A.

    2004-01-01

    How to make use of coastal and marine resources in a sustainable manner is an increasing concern among coastal stakeholders all over the world. Integrated Coastal Zone Management (ICZM) is a well-known concept nowadays, but its implementation is often hampered. This is also the case in Indonesia.

  15. Caseload management, work-related stress and case manager self-efficacy among Victorian mental health case managers.

    Science.gov (United States)

    King, Robert

    2009-05-01

    In Australia and comparable countries, case management has become the dominant process by which public mental health services provide outpatient clinical services to people with severe mental illness. There is recognition that caseload size impacts on service provision and that management of caseloads is an important dimension of overall service management. There has been little empirical investigation, however, of caseload and its management. The present study was undertaken in the context of an industrial agreement in Victoria, Australia that required services to introduce standardized approaches to caseload management. The aims of the present study were therefore to (i) investigate caseload size and approaches to caseload management in Victoria's mental health services; and (ii) determine whether caseload size and/or approach to caseload management is associated with work-related stress or case manager self-efficacy among community mental health professionals employed in Victoria's mental health services. A total of 188 case managers responded to an online cross-sectional survey with both purpose-developed items investigating methods of case allocation and caseload monitoring, and standard measures of work-related stress and case manager personal efficacy. The mean caseload size was 20 per full-time case manager. Both work-related stress scores and case manager personal efficacy scores were broadly comparable with those reported in previous studies. Higher caseloads were associated with higher levels of work-related stress and lower levels of case manager personal efficacy. Active monitoring of caseload was associated with lower scores for work-related stress and higher scores for case manager personal efficacy, regardless of size of caseload. Although caseloads were most frequently monitored by the case manager, there was evidence that monitoring by a supervisor was more beneficial than self-monitoring. Routine monitoring of caseload, especially by a workplace

  16. The impact of staff case manager-case management supervisor relationship on job satisfaction and retention of RN case managers.

    Science.gov (United States)

    Hogan, Tierney D

    2005-01-01

    A positive relationship between staff RN case managers and their case management supervisor significantly impacts job satisfaction and retention in case managers. Literature review supports the premise that staff need to trust their supervisor and that there is a connection between this trust and job satisfaction. Staff case managers need to have a voice at work and feel empowered, and a supervisor's leadership style can influence job satisfaction and retention in their staff.

  17. Integrated supply chain risk management

    OpenAIRE

    Riaan Bredell; Jackie Walters

    2007-01-01

    Integrated supply chain risk management (ISCRM) has become indispensable to the theory and practice of supply chain management. The economic and political realities of the modern world require not only a different approach to supply chain management, but also bold steps to secure supply chain performance and sustainable wealth creation. Integrated supply chain risk management provides supply chain organisations with a level of insight into their supply chains yet to be achieved. If correctly ...

  18. Integrated Work Management: PIC, Course 31884

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Lewis Edward [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-09-08

    The person-in-charge (PIC) plays a key role in the integrated work management (IWM) process at Los Alamos National Laboratory (LANL, or the Laboratory) because the PIC is assigned responsibility and authority by the responsible line manager (RLM) for the overall validation, coordination, release, execution, and closeout of a work activity in accordance with IWM. This course, Integrated Work Management: PIC (Course 31884), describes the PIC’s IWM roles and responsibilities. This course also discusses IWM requirements that the PIC must meet. For a general overview of the IWM process, see self-study Course 31881, Integrated Work Management: Overview. For instruction on the preparer’s role, see self-study Course 31883, Integrated Work Management: Preparer.

  19. Improving adolescent pregnancy outcomes and maternal health:a case study of comprehensive case managed services.

    Science.gov (United States)

    Bowman, Elizabeth K; Palley, Howard A

    2003-01-01

    Our findings indicate how health outcomes regarding adolescent pregnancy and maternal and infant health care are intertwined with a case management process that fosters measures that are social in nature-the provision of direct services, as well as the encouragement of informal social supports systems. They also show how case managed services in a small, nongovernmental organization (NGO) with a strong commitment to its clients may provide the spontaneity and caring which results in a "match" between client needs and the delivery of services-and positive outcomes for pregnant women, early maternal health and infant health. The delivery of such case managed services in a manner which is intensive, comprehensive, flexible and integrated contributes significantly to such improved health outcomes.

  20. Getting the message across: using ecological integrity to communicate with resource managers

    Science.gov (United States)

    Mitchell, Brian R.; Tierney, Geraldine L.; Schweiger, E. William; Miller, Kathryn M.; Faber-Langendoen, Don; Grace, James B.

    2014-01-01

    behavior not occurring until well beyond the historical range of variation, this may provide a scientific basis for shifting an ecological assessment point beyond the historical range. We present two case studies using ongoing monitoring by the US National Park Service Vital Signs program that illustrate the use of an ecological integrity approach to communicate ecosystem status to resource managers. The Wetland Ecological Integrity in Rocky Mountain National Park case study uses an analytical approach that specifically incorporates threshold detection into the process of establishing assessment points. The Forest Ecological Integrity of Northeastern National Parks case study describes a method for reporting ecological integrity to resource managers and other decision makers. We believe our approach has the potential for wide applicability for natural resource management.

  1. Using evidence-integrated e-learning to enhance case management continuing education for psychiatric nurses: a randomised controlled trial with follow-up.

    Science.gov (United States)

    Liu, Wen-I; Rong, Jiin-Ru; Liu, Chieh-Yu

    2014-11-01

    E-learning is a flexible strategy to improve nurses' knowledge of case management, but there are methodological limitations in previous research into the effectiveness of such programs. To describe the development and effectiveness of an evidence-integrated e-learning program in case management continuing education for Taiwanese psychiatric nurses. Multiple methods were adopted to develop the program and a randomised controlled trial with repeated measures was employed to evaluate it. The e-learning program was developed in four stages: (1) systematic review of literature; (2) needs assessment through a national survey and focus group; (3) development of learning materials; and (4) pilot test. Following program development, psychiatric nurses were recruited and randomly allocated into an experimental or comparison group. The experimental group participated in an e-learning continuing education program. The case management knowledge index with sufficient reliability and validity and a satisfaction survey were used to determine the outcomes. A generalised estimating equation was used to assess the difference between the 2 groups before, after, and at 3 months follow-up. The learning material comprised 5 simulated learning modules, self-assessment questions, learning cases, sharing experiences, and learning resources. A total of 200 participants completed the 3 measurements. Knowledge scores in the experimental group significantly exceeded those in the comparison group after the program and at the 3-month follow-up. Participants reported positive learning perceptions. The program provides an evidence-based educational resource for nursing continuing education in case management. Copyright © 2014 Elsevier Ltd. All rights reserved.

  2. Use of integrated dual disorder treatment via assertive community treatment versus clinical case management for persons with co-occurring disorders and antisocial personality disorder.

    Science.gov (United States)

    Frisman, Linda K; Mueser, Kim T; Covell, Nancy H; Lin, Hsiu-Ju; Crocker, Anne; Drake, Robert E; Essock, Susan M

    2009-11-01

    We conducted secondary analyses of data from a randomized trial testing the effectiveness of Assertive Community Treatment (ACT) in delivery of integrated dual disorder treatment (IDDT) to explore the impact of IDDT delivered through ACT teams compared with standard clinical case management for dually-disordered persons with and without antisocial personality disorder (ASPD). This analysis included 36 individuals with ASPD and 88 individuals without ASPD. Participants with ASPD assigned to ACT showed a significantly greater reduction in alcohol use and were less likely to go to jail than those in standard clinical case management, whereas participants without ASPD did not differ between the 2 case management approaches. There were no significant differences for other substance use or criminal justice outcomes. This study provides preliminary evidence that persons with co-occurring serious mental illness, substance use disorders, and ASPD may benefit from delivery of IDDT through ACT teams.

  3. Project management case studies

    CERN Document Server

    Kerzner, Harold R

    2013-01-01

    A new edition of the most popular book of project management case studies, expanded to include more than 100 cases plus a ""super case"" on the Iridium Project Case studies are an important part of project management education and training. This Fourth Edition of Harold Kerzner''s Project Management Case Studies features a number of new cases covering value measurement in project management. Also included is the well-received ""super case,"" which covers all aspects of project management and may be used as a capstone for a course. This new edition:Contains 100-plus case studies drawn from re

  4. Integrated supply chain risk management

    Directory of Open Access Journals (Sweden)

    Riaan Bredell

    2007-11-01

    Full Text Available Integrated supply chain risk management (ISCRM has become indispensable to the theory and practice of supply chain management. The economic and political realities of the modern world require not only a different approach to supply chain management, but also bold steps to secure supply chain performance and sustainable wealth creation. Integrated supply chain risk management provides supply chain organisations with a level of insight into their supply chains yet to be achieved. If correctly applied, this process may optimise management decision-making and assist in the protection and enhancement of shareholder value.

  5. Case management information systems: how to put the pieces together now and beyond year 2000.

    Science.gov (United States)

    Matthews, Pamela

    2002-01-01

    The case management process is a critical management and operational component in the delivery of customer services across the patient care continuum. Case management has transcended time and will continue to be a viable infrastructure process for successful organizations in the future. A key component of the case management infrastructure is information systems and technology support. Case management challenges include effective deployment and use of systems and technology. As more sophisticated, integrated systems are made available, case managers can use these tools to continue to expand effectively beyond the patient's episodic event to provide greater levels of cradle-to-grave management of healthcare. This article explores methods for defining case management system needs and identifying automation options available to the case manager.

  6. Integrated forest management to prevent wildfires under Mediterranean environments

    Directory of Open Access Journals (Sweden)

    Piermaria Corona

    2015-02-01

    Full Text Available This review presents a multidisciplinary framework for integrating the ecological, regulatory, procedural and technical aspects of forest management for fires prevention under Mediterranean environments. The aims are to: i provide a foreground of wildfire scenario; ii illustrate the theoretical background of forest fuel management; iii describe the available fuel management techniques and mechanical operations for fire prevention in forest and wildland-urban interfaces, with exemplification of case-studies; iv allocate fire prevention activities under the hierarchy of forest planning. The review is conceived as an outline commentary discussion targeted to professionals, technicians and government personnel involved in forestry and environmental management.

  7. Integrated Work Management: FOD/RLM, Course 31882

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Lewis Edward [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-08-07

    The facility operations director (FOD) and responsible line manager (RLM) play leadership and functional roles in the integrated work management (IWM) process at Los Alamos National Laboratory (LANL). This course, Integrated Work Management: FOD/RLM (COURSE 31882), describes the IWM roles and responsibilities of the FOD and the RLM; it also discusses IWM requirements that must be met by the FOD and the RLM. Before taking this course, you may want to take COURSE 31881, Integrated Work Management: Overview. This self-study course would be particularly helpful if you are unfamiliar with the IWM process. You should also read Procedure (P) 300, Integrated Work Management. This course briefly covers the roles of the preparer and person in charge (PIC). For more in-depth instruction on the preparer’s role, see COURSE 31883, Integrated Work Management: Preparer. For instruction on the PIC’s role, see COURSE 31884, Integrated Work Management: PIC.

  8. [Implementation and (cost-)effectiveness of case management for people with dementia and their informal caregivers: results of the COMPAS study].

    Science.gov (United States)

    van Mierlo, Lisa D; MacNeil-Vroomen, Janet; Meiland, Franka J M; Joling, Karlijn J; Bosmans, Judith E; Dröes, Rose Marie; Moll van Charante, Eric P; de Rooij, Sophia E J A; van Hout, Hein P J

    2016-12-01

    Different forms of case management for dementia have emerged over the past few years. In the COMPAS study (Collaborative dementia care for patients and caregivers study), two prominent Dutch case management forms were studied: the linkage and the integrated care form. Evaluation of the (cost)effectiveness of two dementia case management forms compared to usual care as well as factors that facilitated or impeded their implementation. A mixed methods design with a) a prospective, observational controlled cohort study with 2 years follow-up among 521 dyads of people with dementia and their primary informal caregiver with and without case management; b) interviews with 22 stakeholders on facilitating and impeding factors of the implementation and continuity of the two case management models. Outcome measures were severity and frequency of behavioural problems (NPI) for the person with dementia and mental health complaints (GHQ-12) for the informal caregiver, total met and unmet care needs (CANE) and quality adjusted life years (QALYs). Outcomes showed a better quality of life of informal caregivers in the integrated model compared to the linkage model. Caregivers in the control group reported more care needs than those in both case management groups. The independence of the case management provider in the integrated model facilitated the implementation, while the rivalry between multiple providers in the linkage model impeded the implementation. The costs of care were lower in the linkage model (minus 22 %) and integrated care model (minus 33 %) compared to the control group. The integrated care form was (very) cost-effective in comparison with the linkage form or no case management. The integrated care form is easy to implement.

  9. Configuration Management Program - a part of Integrated Management System

    International Nuclear Information System (INIS)

    Mancev, Bogomil; Yordanova, Vanja; Nenkova, Boyka

    2014-01-01

    The recently issued International Atomic Energy Agency (IAEA) publications (GS-R-3, GS-G-3.1 and GS-G-3.5) regarding Management Systems for Facilities and Activities define requirements for creation, introduction, evaluation and continuously improvement of the Management System, which unifies the safety, health, environment, security, quality and economic elements. According to GS-R-3 the Integrated Management System is based on defined processes identified in the enterprises: Managing, Basic and Supporting processes. At implementation of their activities, the organizations often apply other standards in their interrelations with suppliers and the parties concerned - ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007, regarding quality, environment and occupational health and safety management. The integration of the standards of both series ensure the observance of the common management principles that reflect the best practices of management as leadership, participation of the people, process approach, continuously improvement, systematical approach to the management and approach based on facts used at the making decisions. The main objective of the Integrated Management System introduction is to ensure safety considering the influence of all additional impacts taken together. The Integrated Management System is based on the process approach at implementation of the activities in nuclear power plant. The transition to the process oriented approach require long period of time, during which the distribution of the responsibilities is optimized up to the level that will satisfy the requirements, reach and maintain the stipulated objectives. The Configuration Management (CM) is an integrated management process by means of which conformity between design requirements, physical configuration and the plant documentation is ascertained and maintained during the entire life cycle of the facility. Processes within configuration management are not isolated, but are part of

  10. National scale-up of integrated community case management in rural Ethiopia: implementation and early lessons learned.

    Science.gov (United States)

    2014-10-01

    Although under-five mortality in Ethiopia has decreased 67% in the past two decades, many, children still die from preventable or treatable conditions, mainly pneumonia, newborn problems, diarrhea, malaria and malnutrition. Most of these deaths can be avoided with timely and appropriate care, but access to and use of treatment remains inadequate. Community health workers, appropriately trained, supervised, and supplied with essen- tial equipment and medicines, can deliver case management or referral to most sick children. In 2010, Ethiopia added pneumonia to diarrhea, malaria and severe acute malnutrition, targeted for treatment in the integrated community case management (iCCM) strategy. This article describes the national scale-up of iCCM implementation and early lessons learned. We reviewed data related to iCCM program inputs and processes from reports, minutes, and related documents from January 2010 through July 2013. We describe introduction and scale-up through eight health system components. The government and partners trained and supplied 27,116 of the total 32,000 Health Extension Workers and mentored 80% of them to deliver iCCM services to over one million children. The government led a strong-iCCM partnership that attracted development partners in implementation, monitoring, evaluation, and research. Service utilization and weak supply chain remain-major challenges. Strong MOH leadership, policy support, and national partnerships helped successful national iCCM scale-up and should help settle remaining challenges.

  11. Critical chain project management and drum-buffer-rope tools integration in construction industry - case study

    Directory of Open Access Journals (Sweden)

    Piotr Cyplik

    2012-03-01

    Full Text Available Background: The concept of integrating the theory of constraints tools in reorganizing management system in a mechanical engineering company was presented in this article. The main aim of the concept is to enable the enterprise to satisfy the customers' expectations at reasonable costs, which allows for making a profit and creating an agile enterprise in the long run. Methods: Due to the individual character of the production process and service process in analyzed company, the described concept using theory of constraints project management (CCPM and manufacturing (DBR tools. The authors use performance levels conception to build an integration tool focused on the interaction and collaboration between different departments. The integration tool has been developed and verified in Polish manufacturing company. Results: In described model a tool compatible with CCPM operates on the level of the customer service process. Shop floor is controlled based on the DBR method. The authors hold that the integration of between TOC tools is of key importance. The integration of TOC tools dedicated to managing customer service and shop floor scheduling and controlling requires developing a mechanism for repeated transmitting the information between them. This mechanism has been developed. Conclusions: The conducted research showed that the developed tool integrating CCPM and DBR had a positive impact on the enterprise performance. It enables improving the company performance in meeting target group requirements by focusing on enhancing the efficiency of processes running in the company and tasks processed at particular work stations. The described model has been successfully implemented in one of the Polish mechanical engineering companies.

  12. How do primary health care teams learn to integrate intimate partner violence (IPV) management? A realist evaluation protocol.

    Science.gov (United States)

    Goicolea, Isabel; Vives-Cases, Carmen; San Sebastian, Miguel; Marchal, Bruno; Kegels, Guy; Hurtig, Anna-Karin

    2013-03-23

    Despite the existence of ample literature dealing, on the one hand, with the integration of innovations within health systems and team learning, and, on the other hand, with different aspects of the detection and management of intimate partner violence (IPV) within healthcare facilities, research that explores how health innovations that go beyond biomedical issues-such as IPV management-get integrated into health systems, and that focuses on healthcare teams' learning processes is, to the best of our knowledge, very scarce if not absent. This realist evaluation protocol aims to ascertain: why, how, and under what circumstances primary healthcare teams engage (if at all) in a learning process to integrate IPV management in their practices; and why, how, and under what circumstances team learning processes lead to the development of organizational culture and values regarding IPV management, and the delivery of IPV management services. This study will be conducted in Spain using a multiple-case study design. Data will be collected from selected cases (primary healthcare teams) through different methods: individual and group interviews, routinely collected statistical data, documentary review, and observation. Cases will be purposively selected in order to enable testing the initial middle-range theory (MRT). After in-depth exploration of a limited number of cases, additional cases will be chosen for their ability to contribute to refining the emerging MRT to explain how primary healthcare learn to integrate intimate partner violence management. Evaluations of health sector responses to IPV are scarce, and even fewer focus on why, how, and when the healthcare services integrate IPV management. There is a consensus that healthcare professionals and healthcare teams play a key role in this integration, and that training is important in order to realize changes. However, little is known about team learning of IPV management, both in terms of how to trigger such learning

  13. Integration in New Product Development: Case Study in a Large Brazilian

    Directory of Open Access Journals (Sweden)

    Daniel Jugend

    2012-02-01

    Full Text Available Proficiency in management activities undertaken in product development processes is regarded as a key competitive advantage for companies, particularly for high-tech industrial firms, which benefit from the important competitiveness factor of launching products with a differentiated technological content. This paper’s objective was to identify, through case study, practices for integration between the roles of R & D with others involved in product development in a large Brazilian company of industrial automation. The results suggest some management practices to improve the integration in new products development, such as the use of employees from marketing with knowledge and experience previously gained from R & D activities and uses the heavyweight product manager to solve synchronization problems between product and technology development.

  14. INTEGRATIVE AUGMENTATION OF STANDARDIZED MANAGEMENT SYSTEMS

    Directory of Open Access Journals (Sweden)

    Stanislav Karapetrovic

    2008-03-01

    Full Text Available The development, features and integrating abilities of different international standards related to management systems are discussed. A group of such standards that augment the performance of quality management systems in organizations is specifically focused on. The concept, characteristics and an illustrative example of one augmenting standard, namely ISO 10001, are addressed. Integration of standardized augmenting systems, both by themselves and within the overall management system, is examined. It is argued that, in research and practice alike, integrative augmentation represents the future of standardized quality and other management systems.

  15. Nurse Case Managers' Experiences on Case Management for Long-term Hospitalization in Korea

    Directory of Open Access Journals (Sweden)

    Jinjoo Oh, Ph.D., RN, GNP

    2017-12-01

    Full Text Available Purpose: The implementation of case management for long-term hospitalization use has been approved for controlling medical cost increases in other countries. But, introduction of the case management in Korea has created issues that hinder its effective operation. This qualitative study aimed to obtain further understanding of the issues surrounding the management of Medical Aid beneficiaries' use of long-term hospitalization from the case managers' perspectives and to provide suggestions for successful case management. Methods: Thematic analysis was employed to analyze the data. Medical Aid case managers with 3 or more years of case management experience were recruited from urban, suburban, and rural regions. Data were collected through in-depth interviews: 12 nurse case managers participated in focus group interviews and 11 participated in individual one-on-one interviews. Results: Four major themes emerged: on-site obstacles that hinder work progress; going in an opposite direction; ambiguous position of case managers; and work-related emotions. Eleven subthemes were discovered: chasing potential candidates; becoming an enemy; discharging patients who have nowhere to go; welfare-centered national policies increasing medical costs; Medical Aid Program that encourages hospitalization; misuse of hospitalization; feeling limited; working without authority; fulfilling the expected role; fretting about social criticism; and feeling neglected and unprotected. Conclusion: The findings highlight the complexity and ambiguity of the issues faced by case managers. Successful management of Medical Aid resources requires the orchestrated efforts and collaboration of multiple stakeholders. More systematized support and resources for nurse case managers are essential to fully implement this nursing innovation in Korea. Keywords: case management, focus groups, hospitalization, qualitative research, vulnerable populations

  16. Integrated groundwater management: An overview of concepts and challenges

    Science.gov (United States)

    Jakeman, Anthony J.; Barreteau, Olivier; Hunt, Randall J.; Rinaudo, Jean-Daniel; Ross, Andrew; Jakeman, Anthony J.; Barreteau, Olivier; Hunt, Randall J.; Rinaudo, Jean-Daniel; Ross, Andrew

    2016-01-01

    Managing water is a grand challenge problem and has become one of humanity’s foremost priorities. Surface water resources are typically societally managed and relatively well understood; groundwater resources, however, are often hidden and more difficult to conceptualize. Replenishment rates of groundwater cannot match past and current rates of depletion in many parts of the world. In addition, declining quality of the remaining groundwater commonly cannot support all agricultural, industrial and urban demands and ecosystem functioning, especially in the developed world. In the developing world, it can fail to even meet essential human needs. The issue is: how do we manage this crucial resource in an acceptable way, one that considers the sustainability of the resource for future generations and the socioeconomic and environmental impacts? In many cases this means restoring aquifers of concern to some sustainable equilibrium over a negotiated period of time, and seeking opportunities for better managing groundwater conjunctively with surface water and other resource uses. However, there are many, often-interrelated, dimensions to managing groundwater effectively. Effective groundwater management is underpinned by sound science (biophysical and social) that actively engages the wider community and relevant stakeholders in the decision making process. Generally, an integrated approach will mean “thinking beyond the aquifer”, a view which considers the wider context of surface water links, catchment management and cross-sectoral issues with economics, energy, climate, agriculture and the environment. The aim of the book is to document for the first time the dimensions and requirements of sound integrated groundwater management (IGM). The primary focus is on groundwater management within its system, but integrates linkages beyond the aquifer. The book provides an encompassing synthesis for researchers, practitioners and water resource managers on the concepts and

  17. Nurse Case Managers' Experiences on Case Management for Long-term Hospitalization in Korea.

    Science.gov (United States)

    Oh, Jinjoo; Oh, Seieun

    2017-12-01

    The implementation of case management for long-term hospitalization use has been approved for controlling medical cost increases in other countries. But, introduction of the case management in Korea has created issues that hinder its effective operation. This qualitative study aimed to obtain further understanding of the issues surrounding the management of Medical Aid beneficiaries' use of long-term hospitalization from the case managers' perspectives and to provide suggestions for successful case management. Thematic analysis was employed to analyze the data. Medical Aid case managers with 3 or more years of case management experience were recruited from urban, suburban, and rural regions. Data were collected through in-depth interviews: 12 nurse case managers participated in focus group interviews and 11 participated in individual one-on-one interviews. Four major themes emerged: on-site obstacles that hinder work progress; going in an opposite direction; ambiguous position of case managers; and work-related emotions. Eleven subthemes were discovered: chasing potential candidates; becoming an enemy; discharging patients who have nowhere to go; welfare-centered national policies increasing medical costs; Medical Aid Program that encourages hospitalization; misuse of hospitalization; feeling limited; working without authority; fulfilling the expected role; fretting about social criticism; and feeling neglected and unprotected. The findings highlight the complexity and ambiguity of the issues faced by case managers. Successful management of Medical Aid resources requires the orchestrated efforts and collaboration of multiple stakeholders. More systematized support and resources for nurse case managers are essential to fully implement this nursing innovation in Korea. Copyright © 2017. Published by Elsevier B.V.

  18. Improving integrated waste management at the regional level: the case of Lombardia.

    Science.gov (United States)

    Rigamonti, Lucia; Falbo, Alida; Grosso, Mario

    2013-09-01

    The article summarises the main results of the 'Gestione Rifiuti in Lombardia: Analisi del ciclo di vita' (Waste management in Lombardia region: Life cycle assessment; GERLA) project. Life cycle assessment (LCA) has been selected by Regione Lombardia as a strategic decision support tool in the drafting of its new waste management programme. The goal was to use the life cycle thinking approach to assess the current regional situation and thus to give useful strategic indications for the future waste management. The first phase of the study consisted of the LCA of the current management of municipal waste in the Lombardia region (reference year: 2009). The interpretation of such results has allowed the definition of four possible waste management scenarios for the year 2020, with the final goal being to improve the environmental performance of the regional system. The results showed that the current integrated waste management of Lombardia region is already characterised by good energy and environmental performances. However, there is still room for further improvement: actions based, on the one hand, on a further increase in recycling rates and, on the other hand, on a series of technological modifications, especially in food waste and residual waste management, can be undertaken to improve the overall system.

  19. GIS-HBIM INTEGRATION FOR THE MANAGEMENT OF HISTORICAL BUILDINGS

    Directory of Open Access Journals (Sweden)

    G. Vacca

    2018-05-01

    Full Text Available As is well known, Italy's very consistent buildings stock has become the major field for real estate investments and for the related projects and actions. It is a heritage that is often barely known and extremely complex, whose management has until now been addressed in a rather casual and uninformed manner, with unsatisfactory and sometimes disastrous outcomes. The situation is worse in the case of buildings of particular historical, artistic and architectural value so frequent within the heritage of our country. This paper shows the findings of an ongoing research which is aimed at structuring the cognitive process and assessing enhancement and re-functionalisation scenarios of our historical and architectural heritage through the use and integration of information systems such as BIM and the GIS. The work led to the development of a workflow able to integrate the contribution of the HBIM and GIS methodologies in the structuring and management of a wide range of digital data and information useful for its management. The research, focused on “La Gran Torre di Oristano, is aimed at creating the best conditions for an integrated and multidisciplinary strategy of requalification and refunctionalisation of historical and architectural heritage.

  20. Integral control for population management.

    Science.gov (United States)

    Guiver, Chris; Logemann, Hartmut; Rebarber, Richard; Bill, Adam; Tenhumberg, Brigitte; Hodgson, Dave; Townley, Stuart

    2015-04-01

    We present a novel management methodology for restocking a declining population. The strategy uses integral control, a concept ubiquitous in control theory which has not been applied to population dynamics. Integral control is based on dynamic feedback-using measurements of the population to inform management strategies and is robust to model uncertainty, an important consideration for ecological models. We demonstrate from first principles why such an approach to population management is suitable via theory and examples.

  1. Fostering food security in areas of extreme poverty through Integrated Farm Management: the case of Burundi

    Science.gov (United States)

    Kessler, Aad; van Duivenbooden, Niek; van Beek, Christy

    2014-05-01

    Extreme poverty in Burundi's rural area and tensions between families with limited access to arable land hinder development towards a more stable and peaceful society. Due to these tensions and a rapid population growth, agricultural land is currently subject to increased degradation and low agricultural productivity. A whole range of other limiting factors contributes to this, such as: poor seed quality, poor nutrient management combined with low soil fertility, inadequate agronomic practices, pests and crop diseases, poorly developed supply chains, health problems, difficult access to credit, and insecurity. Solving one of these problems will not solve the chain that eventually leads to low food production; it will simply move the emphasis to the next constraining factor. An integrated rural development approach is therefore required to break this vicious circle. The project Fanning the Spark, a Public-Private-Partnership between Achmea Foundation, Alterra of Wageningen University and Research Centre, and HealthNet-TPO in Burundi started in September 2013 with an intervention in several rural villages in Gitega. The project's objective is to increase food production at village level, by means of investments in crop production, a family (income) insurance package that protects rural families against the financial consequences of catastrophic events (natural and health) and making micro-credits available. This will enhance farmers' workability and generate income from agricultural activities in order to break the poverty cycle and enhance food security. The insurance package comprises agricultural and health insurances, and will be jointly implemented with the sustainable agriculture component. The latter component focuses on Integrated Farm Management and the use of innovative soil management practices. Farmer-to-farmer training and scaling-up are crucial components, and in the first phase of the project "innovative farmer groups" have a central role in the

  2. Considerations on Integrating Risk and Quality Management

    Directory of Open Access Journals (Sweden)

    Maria POPESCU

    2011-03-01

    Full Text Available This paper aims to highlight the links between risk management and quality management and to study the possibility of their integrated approach. The study reviews the evolution of risk approach within organizations and stresses the need to increase the effectiveness of this approach by incorporating risk management methodology in the quality management system. Starting from this idea, the authors present the current state of risk approach into quality management, basic rules of integrated quality-risk management and major difficulties which may arise in the implementation of integrated quality–risk systems.

  3. Project Management in Public Administration. TPM – Total Project Management Maturity Model. The Case of Slovenian Public Administration

    Directory of Open Access Journals (Sweden)

    Gordana ŽURGA

    2018-02-01

    Full Text Available The purpose of the article is to present the importance of project management for the functioning of public administration, and its contribution to the realization of the developmental goals of the government. For this, integration of strategic management and project management is of vital importance. The methodology used is a combination of literature review, a case study of project management in public administration of the Republic of Slovenia, and development of a maturity model of project management in public administration, with its verifi cation on the case of Slovenia. The main contribution of the study is development of TPM – Total Project Management maturity model for public administration. Upon the TPM maturity model, project management in Slovene public administration is assessed and discussed. Out of fi ve maturity levels, the results for project management in Slovene public administration are: management of projects – level 2 (initiated, management of programs of projects – level 2 (initiated, management of portfolios of projects – level 3 (implemented, organizational support for project management – level 3 (implemented, HRM for project management – level 2 (initiated, and integration of project management and strategic management – level 3 (implemented. General fi ndings and recommendations in this respect are drawn, together with indicated areas for possible further research and investigation.

  4. Pipeline integrity management: integration of geotechnical and mechanical assessment to control potential risks due to external forces

    Energy Technology Data Exchange (ETDEWEB)

    Malpartida Moya, John E.; Sota, Giancarlo Massucco de la; Seri, Walter [Compania Operadora de Gas del Amazonas, Lima (Peru)

    2009-07-01

    Every pipeline integrity management system evaluates and controls various threats. On pipelines which have particular characteristics as it is the case of the Andean pipelines and pipelines crossing jungles, one of the main threats are the external forces. Even, this threat causes a greater number of failures than other threats like corrosion or the third part damage. Facing this situation, the pipeline integrity management system of TgP has achieved an important development in the use and suitable handling of the information provided by diverse techniques of pipeline mechanical inspection and geotechnical inspection of the right-of-way (ROW). This document presents our methodology, which interrelate information of the in-line inspection, information of geotechnical inspections of the ROW, instrumentation (Strain Gages), topographic monitoring, among others. All this information is supported in a Geographic Information System (GIS) which allows us to integrate the information. By means of the pipeline integrity management system we control potential risks due to external forces, we have been able to act before events become critical, with no occurrence of failures. This system allows us simultaneously to optimize efforts and preserve the mechanical integrity of our pipelines, not producing neither personal nor environmental nor economical affectation. (author)

  5. Intelligent Integrated System Health Management

    Science.gov (United States)

    Figueroa, Fernando

    2012-01-01

    Intelligent Integrated System Health Management (ISHM) is the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system (Management: storage, distribution, sharing, maintenance, processing, reasoning, and presentation). Presentation discusses: (1) ISHM Capability Development. (1a) ISHM Knowledge Model. (1b) Standards for ISHM Implementation. (1c) ISHM Domain Models (ISHM-DM's). (1d) Intelligent Sensors and Components. (2) ISHM in Systems Design, Engineering, and Integration. (3) Intelligent Control for ISHM-Enabled Systems

  6. Moving On: Farmer Education in Integrated Insect Pest and Disease Management

    NARCIS (Netherlands)

    Jiggins, J.L.S.; Mancini, F.

    2009-01-01

    This chapter explores intensive hands-on occupational education for farmers in selected European, African, Latin American countries and in south India. An Indian case study of Farmer Field Schools for Integrated Pest and Production Management (IPPM) to ensure food security and livelihood improvement

  7. Managing IT Integration Risk in Acquisitions

    DEFF Research Database (Denmark)

    Henningsson, Stefan; Kettinger, William J.

    2016-01-01

    The article discusses a framework for evaluating risk of information technology (IT) integration in acquisitions. Topics include the use of the experience of serial acquirer Trelleborg AB to show the merits of the framework for managing the risk and to determine low-risk acquisitions......, the importance of managing IT integration risk, and various risk areas for acquisition IT integration....

  8. Integrated parasite management

    DEFF Research Database (Denmark)

    Clausen, Jesper Hedegaard; Madsen, Henry; Van, Phan Thi

    2015-01-01

    communities at risk through mass drug administration. However, we argue that treatment alone will not reduce the risk from eating infected fish and that sustainable effective control must adopt an integrated FZT control approach based on education, infrastructure improvements, and management practices...... that target critical control points in the aquaculture production cycle identified from a thorough understanding of FZT and host biology and epidemiology. We present recommendations for an integrated parasite management (IPM) program for aquaculture farms.......Fishborne zoonotic trematodes (FZT) are an emerging problem and there is now a consensus that, in addition to wild-caught fish, fish produced in aquaculture present a major food safety risk, especially in Southeast Asia where aquaculture is important economically. Current control programs target...

  9. Case management directors: how to manage in a transition-focused world: part 1.

    Science.gov (United States)

    Bankston-White, Cheri; Birmingham, Jackie

    2015-01-01

    Case management directors are in a dynamic position to affect the transition of care for patients across the continuum, work with all levels of providers, and support the financial well-being of a hospital. Most importantly, they can drive good patient outcomes. Although the position is critical on many different levels, there is little to help guide a new director in attending to all the "moving parts" of such a complex role. The purpose of this two-part article is to provide case management directors, particularly new ones, with a framework for understanding and fulfilling their role.We have divided the guide into seven tracks of responsibility. Part 1 discusses the first four tracks: (1) staffing and human resources, (2) compliance and accreditation, (3) discharge planning, and (4) utilization review and revenue cycle. Part 2 addresses (5) internal departmental relationships (organizational), (6) external relationships (Community agency), and (7) quality and program outcomes. The information is most meaningful to those case management directors who work in either stand-alone hospitals or integrated health systems, and have frontline case managers reporting to them. Case management directors would benefit from further research and documentation of "best practices" related to their role, particularly in the areas of leadership and management. New directors would benefit from mentoring and networking with one another. As new regulations and models of care bring increased emphasis and focus to transitions of care, the role of the case management director continues to evolve, growing in importance and complexity. The growing financial impact of readmissions also brings added scrutiny and increased pressure to get the transitions of care right the first time.To operate most effectively, case management directors must understand the full range of their responsibilities and impact. They must find opportunities for themselves and their departments to learn and stay

  10. An International Assessment of Mangrove Management: Incorporation in Integrated Coastal Zone Management

    Directory of Open Access Journals (Sweden)

    Haille N. Carter

    2015-04-01

    Full Text Available Due to increasing recognition of the benefits provided by mangrove ecosystems, protection policies have emerged under both wetland and forestry programs. However, little consistency remains among these programs and inadequate coordination exists among sectors of government. With approximately 123 countries containing mangroves, the need for global management of these ecosystems is crucial to sustain the industries (i.e., fisheries, timber, and tourism and coastal communities that mangroves support and protect. To determine the most effective form of mangrove management, this review examines management guidelines, particularly those associated with Integrated Coastal Zone Management (ICZM. Five case studies were reviewed to further explore the fundamentals of mangrove management. The management methodologies of two developed nations as well as three developing nations were assessed to encompass comprehensive influences on mangrove management, such as socioeconomics, politics, and land-use regulations. Based on this review, successful mangrove management will require a blend of forestry, wetland, and ICZM programs in addition to the cooperation of all levels of government. Legally binding policies, particularly at the international level, will be essential to successful mangrove management, which must include the preservation of existing mangrove habitat and restoration of damaged mangroves.

  11. Data Quality- and Master Data Management - A Hospital Case.

    Science.gov (United States)

    Arthofer, Klaus; Girardi, Dominic

    2017-01-01

    Poor data quality prevents the analysis of data for decisions which are critical for business. It also has a negative impact on business processes. Nevertheless the maturity level of data quality- and master data management is still insufficient in many organizations nowadays. This article discusses the corresponding maturity of companies and a management cycle integrating data quality- and master data management in a case dealing with benchmarking in hospitals. In conclusion if data quality and master data are not properly managed, structured data should not be acquired in the first place due to the added expense and complexity.

  12. Spatial Preference Heterogeneity for Integrated River Basin Management: The Case of the Shiyang River Basin, China

    Directory of Open Access Journals (Sweden)

    Fanus Asefaw Aregay

    2016-09-01

    Full Text Available Integrated river basin management (IRBM programs have been launched in most parts of China to ease escalating environmental degradation. Meanwhile, little is known about the benefits from and the support for these programs. This paper presents a case study of the preference heterogeneity for IRBM in the Shiyang River Basin, China, as measured by the Willingness to Pay (WTP, for a set of major restoration attributes. A discrete choice analysis of relevant restoration attributes was conducted. The results based on a sample of 1012 households in the whole basin show that, on average, there is significant support for integrated ecological restoration as indicated by significant WTP for all ecological attributes. However, residential location induced preference heterogeneities are prevalent. Generally, compared to upper-basin residents, middle sub-basin residents have lower mean WTP while lower sub-basin residents express higher mean WTP. The disparity in utility is partially explained by the difference in ecological and socio-economic status of the residents. In conclusion, estimating welfare benefit of IRBM projects based on sample responses from a specific sub-section of the basin only may either understate or overstate the welfare estimate.

  13. Consumers' preferences for Integrated Pest Management: Experimental insights

    OpenAIRE

    Biguzzi, Coralie; Ginon, Emilie; Gomez-y-Paloma, Sergio; Langrell, Sergio; Lefebvre, Marianne; Marette, Stephan; Mateu, Guillermo; Sutan, Angela

    2014-01-01

    This article aims to analyse consumers' preferences for Integrated Pest Management (IPM), in comparison to conventional and organic food products. It analyses the case of tomatoes, based on experimental data of 189 French consumers. We find that consumers are more interested in information on the production system than on the characteristics of the final product in terms of pesticide residue levels, and more in IPM than organic. While information on IPM production increases consumers' willing...

  14. Case management directors: how to manage in a transition-focused world: part 2.

    Science.gov (United States)

    Bankston White, Cheri; Birmingham, Jackie

    2015-01-01

    Case management directors are in a dynamic position to affect the transition of care of patients across the continuum, work with all levels of providers, and support the financial well-being of a hospital. Most importantly, they can drive good patient outcomes. Although the position is critical on many different levels, there is little to help guide a new director in attending to all the "moving parts" of such a complex role.This is Part 2 of a two-part article written for case management directors, particularly new ones.Part 1 covered the first 4 of 7 tracks: (1) Staffing and Human Resources, (2) Compliance and Accreditation, (3) Discharge Planning and (4) Utilization Review and Revenue Cycle. Part 2 addresses (5) Internal Departmental Relationships (Organizational), (6) External Relationships (Community Agency), and (7) Quality and Program Outcomes.This article attempts to answer the following questions: : The information is most meaningful to those case management directors who work in either stand-alone hospitals or integrated health systems and have frontline case managers (CMs) reporting to them. Part 1 found that case management directors would benefit from further research and documentation of "best practices" related to their role, particularly in the areas of leadership and management. The same conclusion applies to Part 2, which addresses the director's responsibilities outside her immediate department. Leadership and management skills apply as well to building strong, productive relationships across a broad spectrum of external organizations that include payer, provider, and regulatory agencies. At the same time, they must also develop the skills to positively influence the revenue cycle and financial health of both the organization for which they work and those to whom they transition patients. A director of case management with responsibility for transitions of care has more power and influence over patient safety than is commonly known. Few of the

  15. Practical applications approach to design, development and implementation of an integrated management system

    International Nuclear Information System (INIS)

    Holdsworth, Rodger

    2003-01-01

    The introduction of quality, risk, safety, health and environmental management philosophies has significantly changed industry's view of company organization and controlling processes. Quality, risk, safety, health and environmental programs and systems, such as ISO 9000, ISO 14000, process safety, and risk management are impacting the way industry will meet the challenges of safety and environmental risks and the needs of the customer in the future. A wealth of knowledge has been extracted from practical application case studies, which would otherwise be unobtainable without years of experience related to management systems design, development, implementation and control. This paper discusses a practical applications approach to design, develop and implement an integrated management system encompassing quality (ISO 9000), process safety management (CFR 29 1910.119), risk management programs (CFR 40 part 68), environmental management (ISO 14000), and safety and health. This paper includes a discussion of management systems integration and an overview of management systems standards that apply to the petrochemical and chemical manufacturers industries. The paper also provides an overview on integrating management systems, including issues related to the following topics: - Establishing a management system team and objectives. - Assessing and knowing your organization. - Designing the management system to meet site objectives. - Developing system documentation. - Implementing effective management systems. - Measuring program performance. - Continuous improvement

  16. IGSC - Integration Group for the Safety Case

    International Nuclear Information System (INIS)

    2015-01-01

    Countries that rely on nuclear energy and materials have an ethical obligation to manage radioactive waste in a safe and environmentally responsible manner. For society to support the sustainable solutions envisaged, disposal concepts must be technologically sound and the safety of these concepts must be convincingly demonstrated. The Nuclear Energy Agency's Integration Group for the Safety Case (IGSC) establishes and documents the technical and scientific basis for developing and reviewing safety cases as a platform for dialogue among technical experts and as a tool for decision making. The IGSC addresses various strategic and policy aspects of radioactive waste management as the technical advisory body to the NEA Radioactive Waste Management Committee (RWMC) for all issues related to repository development. For more than two decades, the IGSC and its predecessor technical groups have promoted the exchange of national experience in evaluating and implementing geological repositories. IGSC activities foster consensus on best practices and encourage the development of innovative, advanced approaches covering the technical aspects at all stages of repository implementation, including: - strategies to characterise and evaluate potential disposal sites; - methods to design and test engineered barrier systems; - priorities for research and development programmes to improve the understanding of important processes and interactions; - tools for safety assessments; - techniques for the effective presentation and communication of the results of safety cases and other factors that provide the basis for increased confidence in the safety of geological disposal facilities. The IGSC has been instrumental in further developing the 'modern safety case', a concept that originally emerged from NEA work in the 1990's. Cooperation with the International Atomic Energy Agency (IAEA) and the European Commission (EC) has led to the worldwide adoption of this safety

  17. Management of area-wide integrated pest management programmes that integrate the sterile insect technique

    International Nuclear Information System (INIS)

    Dyck, V.A.; Vreysen, M.J.B.; Reyes Flores, J.; Regidor Fernandez, E.E.; Teruya, T.; Barnes, B.; Gomez Riera, P.; Lindquist, D.; Loosjes, M.

    2005-01-01

    Effective management of area-wide integrated pest management (AW-IPM) programmes that integrate the sterile insect technique (SIT) is key to success. Programme planning includes collection of baseline data and a feasibility assessment. The optimal management structure is where the programme can be implemented effectively and flexibly, independent of government politics, bureaucracy, and even corruption that impede timely goal achievement. Ideally, programmes include both public and private management, and require strong and steady financial support. Governments and donors are the most common sources of funds, but a mixture of public, community, and private funds is now the trend. Interrupted cash flow severely restrains programme performance. Physical support of programme operations must be reliable, and led by a maintenance professional. It is essential to have full-time, well-paid, and motivated staff led by a programme manger with technical and management experience. Programme failure is usually due to poor management and inadequate public support, and not to poor technology. (author)

  18. Organizational learning in developing the integrated quality management

    Directory of Open Access Journals (Sweden)

    Juhani Anttila

    2018-04-01

    Full Text Available High quality is organizations’ competitive advantage. It is beneficial to base this on professional approach, and basic concepts and definitions with scientific foundation. The necessary main concepts consist of quality, quality management, quality improvement and quality assurance. Organizations' top management is responsible of the quality management decisions and implementations. The present practical situation is fragmented and the implementations are most often based on the instrumental means of the different methodological schools, which is confusing and detrimental to the understanding and usefulness of the concept of quality management. It is not beneficial to build a special system for quality management by only following the requirements of the general standard. This cannot ensure competitive business advantage. In this article, we present an alternative approach that is a natural practical way to realize quality management as the teleological solution, Quality Integration, in which the general and specific quality concepts, principles and methodology are embedded within the normal business management activities. Our Quality Integration is based on the thinking of organizational learning. Its framework covers both running the current business and improving the overall business performance. This model has been used as the thinking framework in practical organizational cases since 1990’s. As the business circumstances change constantly, the organization must be constantly ready to renew through both small and radical changes. This change also receives resistance, and the development takes place according to a multi-phase process towards the new integration and requires a proper recognition and decisions. Principles of the organizational learning can help organizations in a consistent way. Evaluation of the overall organizational performance is an important quality management practice and should take into account performance enablers

  19. Integrated ocean management as a strategy to meet rapid climate change: the Norwegian case.

    Science.gov (United States)

    Hoel, Alf Håkon; Olsen, Erik

    2012-02-01

    The prospects of rapid climate change and the potential existence of tipping points in marine ecosystems where nonlinear change may result from them being overstepped, raises the question of strategies for coping with ecosystem change. There is broad agreement that the combined forces of climate change, pollution and increasing economic activities necessitates more comprehensive approaches to oceans management, centering on the concept of ecosystem-based oceans management. This article addresses the Norwegian experience in introducing integrated, ecosystem-based oceans management, emphasizing how climate change, seen as a major long-term driver of change in ecosystems, is addressed in management plans. Understanding the direct effects of climate variability and change on ecosystems and indirect effects on human activities is essential for adaptive planning to be useful in the long-term management of the marine environment.

  20. Integrated project management type contracts

    International Nuclear Information System (INIS)

    Heisler, S.I.

    1975-01-01

    The concept of integrated project management represents a single source to which the owner can turn for all project management functions excepting for those relating to outside parties such as site purchase, personnel selection etc. Other functions such as design, procurement, construction management, schedule and cost control, quality assurance/quality control are usually handled by the integrated project manager as the agent of the owner. The arrangement is flexible and the responsibilities can be varied to suit the size and experience of the owner. Past experience in the United States indicates an increase in the trend toward IPM work and it appears that overseas this trend is developing also. (orig./RW) [de

  1. Renewed mer model of integral management

    Directory of Open Access Journals (Sweden)

    Janko Belak

    2015-12-01

    Full Text Available Background: The research work on entrepreneurship, enterprise's policy and management, which started in 1992, successfully continued in the following years. Between 1992 and 2011, more than 400 academics and other researchers have participated in research work (MER research program whose main orientation has been the creation of their own model of integral management. Results: In past years, academics (researchers and authors of published papers from Austria, Belgium, Bosnia and Herzegovina, Bulgaria, Byelorussia, Canada, the Czech Republic, Croatia, Estonia, France, Germany, Hungary, Italy, Poland, Romania, Russia, the Slovak Republic, Slovenia, Switzerland, Ukraine, and the US have cooperated in MER programs, coming from more than fifty institutions. Thus, scientific doctrines of different universities influenced the development of the MER model which is based on both horizontal and vertical integration of the enterprises' governance and management processes, instruments and institutions into a consistently operating unit. Conclusions: The presented MER model is based on the multi-layer integration of governance and management with an enterprise and its environment, considering the fundamental desires for the enterprises' existence and, thus, their quantitative as well as qualitative changes. The process, instrumental, and institutional integrity of the governance and management is also the initial condition for the implementation of all other integration factors.

  2. Policy entrepreneurs and structural influence in integrated community case management policymaking in Burkina Faso

    Science.gov (United States)

    2015-01-01

    Policy entrepreneurs are individuals who attempt to influence the policy process and its outcomes through their opportunistic or incremental actions. Their success in the policy-making process has been associated with the convergence of four factors: behavioural traits; institutional factors; network position and political capital. Policy entrepreneurs have received little study in low- and middle-income country policy research despite observations of individualized decision-making, informal institutions and the unequal distribution and exercise of power in policymaking. This article aims to identify whether policy entrepreneurs were present in the policy process around integrated community case management (iCCM) in Burkina Faso, whether they were successful in achieving policy change, and whether success or failure can be explained using existing policy entrepreneur frameworks from high-income polities. This mixed methods policy study collected data from in-depth qualitative interviews and social network surveys of actors involved in iCCM policymaking [known locally as C-integrated management of childhood illness (IMCI)]; data were analysed based on the framework categories. Interview data pointed to one key individual who played a significant role in the inclusion of pneumonia treatment into the country’s iCCM policy, an issue that had been a point of contention between government policy elites and development partners. Social network data confirmed that this actor was strategically located in the policy network to be able to reach the most other actors and to be able to control the flow of information. Although some development partner actors were as strategically located, none had the same level of authority or trust as was imbued by being a member of the government civil service. The entrepreneur’s mid-level rank in the health ministry may have encouraged him/her to invest political capital and take risks that would not have been feasible or attractive to

  3. Integrating transportation and production: an international study case

    OpenAIRE

    L Bertazzi; O Zappa

    2012-01-01

    The problem we study is inspired by the real case of Mesdan S.p.A., an Italian company worldwide leader in the textile machinery sector, which has two production units with two warehouses, one located in Italy (Brescia) and the other in China (Foshan). The critical point in this logistic system is the integration between production and transportation management, given the long distance between Brescia and Foshan. Shipments are performed by the means of different types of vehicles with differe...

  4. Integrated crisis management exercises

    International Nuclear Information System (INIS)

    Callen, R.B.; DeHart, R.E.

    1994-01-01

    This paper describes some of the steps that Mobil has taken to enhance their crisis management capability and to improve their readiness. The approach stretches from the individual plant level to Mobil's Corporate offices in Fairfax, Virginia. Some of the lessons learned from several integrated crisis management exercises are outlined and some areas where additional industry co-operation in crisis management could pay dividends are suggested

  5. Insights to Building a Succesful E-filing Case Management Service: U.S. Federal Court Experience

    Directory of Open Access Journals (Sweden)

    J. Michael Greenwood

    2012-06-01

    Full Text Available The U.S. Federal Courts Case Management/Electronic Case Files (CM/ECF service is a very successful court automation system deployed throughout the country that integrated case management, electronic court case records and documents, and the electronic transmission and service of court records via the Internet. The authors briefly explain the history of automation development and indicators of success in these courts. The primary focus of the article is (a on what capabilities and functions should be integrated into any modern court electronic filing and case management service; and (b on insights as to key technical components, fundamental project guidelines, technical objectives, and non-technical principles and implementation techniques that were critical to achieving success. The ultimate CM/ECF goals that have been achieved are (1 that the entire U.S. federal court community (court, lawyers, government, public are comfortable in totally relying on this service, and (2 that CM/ECF is the official record eliminating the traditional paper record.

  6. Nurse Case Managers' Experiences on Case Management for Long-term Hospitalization in Korea

    OpenAIRE

    Jinjoo Oh, Ph.D., RN, GNP; Seieun Oh, Ph.D., RN

    2017-01-01

    Purpose: The implementation of case management for long-term hospitalization use has been approved for controlling medical cost increases in other countries. But, introduction of the case management in Korea has created issues that hinder its effective operation. This qualitative study aimed to obtain further understanding of the issues surrounding the management of Medical Aid beneficiaries' use of long-term hospitalization from the case managers' perspectives and to provide suggestions for ...

  7. An integrated expert system for optimum in core fuel management

    International Nuclear Information System (INIS)

    Abd Elmoatty, Mona S.; Nagy, M.S.; Aly, Mohamed N.; Shaat, M.K.

    2011-01-01

    Highlights: → An integrated expert system constructed for optimum in core fuel management. → Brief discussion of the ESOIFM Package modules, inputs and outputs. → Package was applied on the DALAT Nuclear Research Reactor (0.5 MW). → The Package verification showed good agreement. - Abstract: An integrated expert system called Efficient and Safe Optimum In-core Fuel Management (ESOIFM Package) has been constructed to achieve an optimum in core fuel management and automate the process of data analysis. The Package combines the constructed mathematical models with the adopted artificial intelligence techniques. The paper gives a brief discussion of the ESOIFM Package modules, inputs and outputs. The Package was applied on the DALAT Nuclear Research Reactor (0.5 MW). Moreover, the data of DNRR have been used as a case study for testing and evaluation of ESOIFM Package. This paper shows the comparison between the ESOIFM Package burn-up results, the DNRR experimental burn-up data, and other DNRR Codes burn-up results. The results showed good agreement.

  8. Y-12 Integrated Materials Management System

    Energy Technology Data Exchange (ETDEWEB)

    Alspaugh, D. H.; Hickerson, T. W.

    2002-06-03

    The Integrated Materials Management System, when fully implemented, will provide the Y-12 National Security Complex with advanced inventory information and analysis capabilities and enable effective assessment, forecasting and management of nuclear materials, critical non-nuclear materials, and certified supplies. These capabilities will facilitate future Y-12 stockpile management work, enhance interfaces to existing National Nuclear Security Administration (NNSA) corporate-level information systems, and enable interfaces to planned NNSA systems. In the current national nuclear defense environment where, for example, weapons testing is not permitted, material managers need better, faster, more complete information about material properties and characteristics. They now must manage non-special nuclear material at the same high-level they have managed SNM, and information capabilities about both must be improved. The full automation and integration of business activities related to nuclear and non-nuclear materials that will be put into effect by the Integrated Materials Management System (IMMS) will significantly improve and streamline the process of providing vital information to Y-12 and NNSA managers. This overview looks at the kinds of information improvements targeted by the IMMS project, related issues, the proposed information architecture, and the progress to date in implementing the system.

  9. Integrated solid waste management in megacities

    Directory of Open Access Journals (Sweden)

    M.A. Abdoli

    2016-05-01

    Full Text Available Rapid urbanization and industrialization, population growth and economic growth in developing countries make management of municipal solid waste more complex comparing with developed countries. Furthermore, the conventional municipal solid waste management approach often is reductionists, not tailored to handle complexity. Therefore, the need to a comprehensive and multi-disciplinary approach regarding the municipal solid waste management problems is increasing. The concept of integrated solid waste management is accepted for this aim all over the world. This paper analyzes the current situation as well as opportunities and challenges regarding municipal solid waste management in Isfahan according to the integrated solid waste management framework in six aspects: environmental, political/legal, institutional, socio-cultural, financial/economic, technical and performance aspects. Based on the results obtained in this analysis, the main suggestions for future integrated solid waste management of Isfahan are as i promoting financial sustainability by taking the solid waste fee and reducing the expenses through the promoting source collection of recyclable materials, ii improving compost quality and also marketing the compost products simultaneously, iii promoting the private sector involvements throughout the municipal solid waste management system.

  10. Y-12 Integrated Materials Management System

    International Nuclear Information System (INIS)

    Alspaugh, D. H.; Hickerson, T. W.

    2002-01-01

    The Integrated Materials Management System, when fully implemented, will provide the Y-12 National Security Complex with advanced inventory information and analysis capabilities and enable effective assessment, forecasting and management of nuclear materials, critical non-nuclear materials, and certified supplies. These capabilities will facilitate future Y-12 stockpile management work, enhance interfaces to existing National Nuclear Security Administration (NNSA) corporate-level information systems, and enable interfaces to planned NNSA systems. In the current national nuclear defense environment where, for example, weapons testing is not permitted, material managers need better, faster, more complete information about material properties and characteristics. They now must manage non-special nuclear material at the same high-level they have managed SNM, and information capabilities about both must be improved. The full automation and integration of business activities related to nuclear and non-nuclear materials that will be put into effect by the Integrated Materials Management System (IMMS) will significantly improve and streamline the process of providing vital information to Y-12 and NNSA managers. This overview looks at the kinds of information improvements targeted by the IMMS project, related issues, the proposed information architecture, and the progress to date in implementing the system

  11. Advantages and Limitations of Integrated Management System: the Theoretical Viewpoint

    Directory of Open Access Journals (Sweden)

    Agota Giedrė Raišienė

    2013-08-01

    Full Text Available Purpose. The goal of the paper is to discuss the potential benefits and to highlight the drawbacks of integrated management system for organizations that seek to improve management process.Methodology. Methods of the research were used: analysis of a scientific and special literature that presents the requirements, models and results of integrated management systems studies, and analysis of statistical data to assess actuality of integrated management systems for enterprises in Lithuania.Findings. Summarizing research findings, it should be stated that the implementation of management system integration should be based on provision of social responsibility and holistic approach to the organization. It requires the long-term united efforts of leaders in a strategic hierarchical level and high organizational maturity to ensure the fluency of the running stages of planning management system integration, preparing documentations, implementing and realizing integrated management system. Also it is necessary to purify the conception of integrated management system in organizational context. Theoretical analysis of integrated management systems show, that all of the management systems can not be well integrated in principle. They can only be partly integrated and coordinated. A need to question the level of integration of management systems is very important as in scientific discourse as in practice. It is important to mark, that the number of organizations, that seek to optimize management processes by implementing the integrated management systems is rapidly increasing in Lithuania, too. It shows that benefit associated with integration of management systems is apprehensible in Lithuania. Advantages of integrated management systems can certainly become even stronger if scientists and practicians join their forces in search of methods of organizational management development.Research limitations. The research limitations related to a lack of

  12. Modelling process integration and its managementcase of a public housing delivery organization in United Arab Emirates

    Directory of Open Access Journals (Sweden)

    Venkatachalam Senthilkumar

    2017-01-01

    Full Text Available Huge volume of project information are generated during the life cycle of an AEC projects. These project information are categorized in to technical and administrative information and managed through appropriate processes. There are many tools such as Document Management Systems, Building Information Modeling (BIM available to manage and integrate the technical information. However, the administrative information and its related processes such as the payment, status, authorization, approval etc. are not effectively managed. The current study aims to explore the administrative information management process of a local housing delivery public agency. This agency manages more than 2000 housing projects at any time of a year. The administrative processesare characterized withdelivery inconsistencies among various project participants. Though there are many commercially available process management systems, there exist limitations on the customization of the modules/ systems. Hence there is a need to develop an information management system which can integrates and manage these housing projects processes effectively. This requires the modeling of administrative processes and its interfaces among the various stakeholder processes. Hence this study aims to model the administrative processes and its related information during the life cycle of the project using IDEF0 and IDEF1X modeling. The captured processes and information interfaces are analyzed and appropriate process integration is suggested to avoid the delay in their project delivery processes. Further, the resultant model can be used for effectively managing the housing delivery projects.

  13. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  14. Advantages and Limitations of Integrated Management System: the Theoretical Viewpoint

    Directory of Open Access Journals (Sweden)

    Agota Giedrė Raišienė

    2011-08-01

    Full Text Available Purpose. The goal of the paper is to discuss the potential benefits and to highlight the drawbacks of integrated management system for organizations that seek to improve management process.Methodology. Methods of the research were used: analysis of a scientific and special literature that presents the requirements, models and results of integrated management systems studies, and analysis of statistical data to assess actuality of integrated management systems for enterprises in Lithuania.Findings. Summarizing research findings, it should be stated that the implementation of management system integration should be based on provision of social responsibility and holistic approach to the organization. It requires the long-term united efforts of leaders in a strategic hierarchical level and high organizational maturity to ensure the fluency of the running stages of planning management system integration, preparing documentations, implementing and realizing integrated management system. Also it is necessary to purify the conception of integrated management system in organizational context. Theoretical analysis of integrated management systems show, that all of the management systems can not be well integrated in principle. They can only be partly integrated and coordinated. A need to question the level of integration of managementsystems is very important as in scientific discourse as in practice. It is important to mark, that the number of organizations, that seek to optimize management processes by implementing the integrated management systems is rapidly increasing in Lithuania, too. It shows that benefit associated with integration of management systems is apprehensible in Lithuania. Advantages of integrated management systems can certainly become even stronger if scientists and practicians join their forces in search of methods of organizational management development.Research limitations. The research limitations related to a lack of integrated

  15. Integrated water resources management : A case study in the Hehei river basin, China

    Science.gov (United States)

    Jia, Siqi; Deng, Xiangzheng

    2017-04-01

    The lack of water resources experienced in different parts of the world has now been recognized and analyzed by different international organizations such as WHO, the World Bank, etc. Add to this the growing urbanization and the fast socio-economic development, the water supply of many urban areas is already or will be severely threatened. Recently published documents from the UN Environmental Program confirms that severe water shortage affects 400 million people today and will affect 4 billion people by 2050. Water nowadays is getting scarce, and access to clean drinking water and water for agricultural usage is unequally distributed. The biggest opportunity and challenge for future water management is how to achieve water sustainability to reduce water consumption. Integrated Water Resources Management (IWRM) is a process which promotes the coordinated development and management of water, land and related resources in order to maximize economic and social welfare in an equitable manner without compromising the sustainability of vital ecosystems. We take the Heibe river basin where agriculture water there accounted for 90% of total water consumption as an example to study the impacts of IWRM on regional water resources. We calculated the elasticity of substitution values between labor and land, water by each irrigation areas to find the variable elastic value among irrigation areas, and the water-use efficiency based on NPP estimation with the C-fix model and WUE estimation with NPP and ET. The empirical analysis indicated that the moderate scale of farmland is 0.27-0.53hm2 under the condition of technical efficiency of irrigation water and production. Agricultural water use accounted for 94% of the social and economic water consumption in 2012, but water efficiency and water productivity were both at a low stage. In conclusion, land use forms at present in Heihe river basin have a detrimental impact on the availability of ecological water use. promoting water

  16. Multidisciplinary management--an opportunity for service integration.

    Science.gov (United States)

    Cameron, M

    1997-01-01

    The management team of the future will enter an environment requiring facilitation, participation, clinical, and empowerment skills. Those individuals who possess a clinical orientation as well as business expertise will be sought to manage multidisciplinary units. The rapid changes in the health-care environment have forced organizations to restructure their operations. To achieve quality care, customer satisfaction, cost-effectiveness, and efficiency, service integration across the organization will be required. As we approach the 21st century, this standard will evolve until "all levels are managing patient care." Some of the restructuring trends occurring in the health-care industry have been collaboration service integration, management consolidation, and job elimination. The emphasis for the multidisciplinary manager of the future will include integrating the professional and clinical services, managing information, building community partnerships, promoting physician collaboration, and managing the change process. A model organization in the next century will move toward a people-oriented system with inclusion and empowerment initiatives. Service integration will affect all organizations, but the disciplines within the Clinical Support System will be the most affected. Future opportunities of leadership will exist for pathologists, nurses, or medical technologists as the professional silos of managers and clinicians continue to crumble.

  17. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  18. Integrated management system

    International Nuclear Information System (INIS)

    Florescu, N.

    2003-01-01

    A management system is developed in order to reflect the needs of the business and to ensure that the objectives of the organization will be achieved. The process model and each individual process within the system then needs to identify the drives or requirements from external customers and stakeholders, regulations, and standards such as ISO and 50-C-Q. The processes are then developed to address these drivers. Developing the process in this way makes it fully integrated and capable of incorporating any new requirements. The International Standard (ISO 9000:2000) promotes the adoption of a process approach when developing, implementing and improving the effectiveness of a quality management system to enhance customer satisfaction by meeting customer requirements. The IAEA Code recognizes that the entire work is a process which can be planned, assessed and improved. For an organization to function effectively, numerous linked activities have to be identified and managed. By definition a process is an activity that using resources and taking into account all the constraints imposed executes the necessary operations which transform the inputs in outcomes. Running a system of processes within an organization, identification of the interaction between the processes and their management can be referred to as a 'process approach'. The advantage of such an approach is the ensuring of the ongoing control over the linkage between the individual processes composing the system as well as over their combination and interaction. Developing a management system implies: identification of the process which delivers Critical Success Factor (CSFs) of the business; identifying the support processes enabling the CSFs to be accomplished; identifying the processes that deliver the business fundamentals. An integrated management system should include all activities not only those related to Quality, Health and Safety. When developing an IMS it is necessary to identify all of the drivers

  19. Integrated Data Management Processes Expedite Common Data Management Tasks in Autism Research

    OpenAIRE

    Farach, Frank; Sinanis, Naralys; Hawthorne, Julie; Agnew, Henry; Schantz, Tricia; Jensen, Bill; Rozenblit, Leon

    2013-01-01

    We compare the efficiency of (1) just-in-time data management, in which data are cleaned prior to each analysis, and (2) integrated data management, in which data are centralized, cleaned up front, and made available via a query interface. Integrated data management was associated with faster completion of data management requests.

  20. Assessment and management of ecological integrity: Chapter 12

    Science.gov (United States)

    Kwak, Thomas J.; Freeman, Mary C.

    2010-01-01

    Assessing and understanding the impacts of human activities on aquatic ecosystems has long been a focus of ecologists, water resources managers, and fisheries scientists. While traditional fisheries management focused on single-species approaches to enhance fish stocks, there is a growing emphasis on management approaches at community and ecosystem levels. Of course, as fisheries managers shift their attention from narrow (e.g., populations) to broad organizational scales (e.g., communities or ecosystems), ecological processes and management objectives become more complex. At the community level, fisheries managers may strive for a fish assemblage that is complex, persistent, and resilient to disturbance. Aquatic ecosystem level objectives may focus on management for habitat quality and ecological processes, such as nutrient dynamics, productivity, or trophic interactions, but a long-term goal of ecosystem management may be to maintain ecological integrity. However, human users and social, economic, and political demands of fisheries management often result in a reduction of ecological integrity in managed systems, and this conflict presents a principal challenge for the modern fisheries manager. The concepts of biotic integrity and ecological integrity are being applied in fisheries science, natural resource management, and environmental legislation, but explicit definitions of these terms are elusive. Biotic integrity of an ecosystem may be defined as the capability of supporting and maintaining an integrated, adaptive community of organisms having a species composition, diversity, and functional organization comparable to that of a natural habitat of the region (Karr and Dudley 1981). Following that, ecological integrity is the summation of chemical, physical, and biological integrity. Thus, the concept of ecological integrity extends beyond fish and represents a holistic approach for ecosystem management that is especially applicable to aquatic systems. The

  1. Integrated Work Management: Preparer, Course 31883

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Lewis Edward [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-08-07

    The preparer (also called the “planner”) plays a key role in the integrated work management (IWM) process at Los Alamos National Laboratory (LANL). This course, Integrated Work Management: Preparer (COURSE 31883), describes the IWM roles and responsibilities of the preparer. This course also discusses IWM requirements that must be met by the preparer.

  2. Implementation of integrated management system

    International Nuclear Information System (INIS)

    Gaspar Junior, Joao Carlos A.; Fonseca, Victor Zidan da

    2007-01-01

    In present day exist quality assurance system, environment, occupational health and safety such as ISO9001, ISO14001 and OHSAS18001 and others standards will can create. These standards can be implemented and certified they guarantee one record system, quality assurance, documents control, operational control, responsibility definition, training, preparing and serve to emergency, monitoring, internal audit, corrective action, continual improvement, prevent of pollution, write procedure, reduce costs, impact assessment, risk assessment , standard, decree, legal requirements of municipal, state, federal and local scope. These procedure and systems when isolate applied cause many management systems and bureaucracy. Integration Management System reduce to bureaucracy, excess of documents, documents storage and conflict documents and easy to others standards implementation in future. The Integrated Management System (IMS) will be implemented in 2007. INB created a management group for implementation, this group decides planing, works, policy and advertisement. Legal requirements were surveyed, internal audits, pre-audits and audits were realized. INB is partially in accordance with ISO14001, OSHAS18001 standards. But very soon, it will be totally in accordance with this norms. Many studies and works were contracted to deal with legal requirements. This work have intention of show implementation process of ISO14001, OHSAS18001 and Integrated Management System on INB. (author)

  3. Hybrid Risk Management Methodology: A Case Study

    Directory of Open Access Journals (Sweden)

    Jacky Siu-Lun Ting

    2009-10-01

    Full Text Available Risk management is a decision-making process involving considerations of political, social, economic and engineering factors with relevant risk assessments relating to a potential hazard. In the last decade, a number of risk management tools are introduced and employed to manage and minimize the uncertainty and threats realization to the organizations. However, the focus of these methodologies are different; in which companies need to adopt various risk management principles to visualize a full picture of the organizational risk level. Regarding to this, this paper presents a new approach of risk management that integrates Hierarchical Holographic Modeling (HHM, Enterprise Risk Management (ERM and Business Recovery Planning (BCP for identifying and assessing risks as well as managing the consequences of realized residual risks. To illustrate the procedures of the proposed methodology, a logistic company ABC Limited is chosen to serve as a case study Through applying HHM and ERM to investigate and assess the risk, ABC Limited can be better evaluated the potential risks and then took the responsive actions (e.g. BCP to handle the risks and crisis in near future.

  4. Improving integration for integrated coastal zone management: an eight country study.

    Science.gov (United States)

    Portman, M E; Esteves, L S; Le, X Q; Khan, A Z

    2012-11-15

    Integrated coastal zone management (ICZM) is a widely accepted approach for sustainable management of the coastal environment. ICZM emphasizes integration across sectors, levels of government, uses, stakeholders, and spatial and temporal scales. While improving integration is central to progress in ICZM, the role of and the achievement of integration remain understudied. To further study these two points, our research analyzes the performance of specific mechanisms used to support ICZM in eight countries (Belgium, India, Israel, Italy, Portugal, Sweden, UK, and Vietnam). The assessment is based on a qualitative comparative analysis conducted through the use of two surveys. It focuses on five ICZM mechanisms (environmental impact assessment; planning hierarchy; setback lines; marine spatial planning, and regulatory commission) and their role in improving integration. Our findings indicate that certain mechanisms enhance specific types of integration more effectively than others. Environmental impact assessment enhances science-policy integration and can be useful to integrate knowledge across sectors. Planning hierarchy and regulatory commissions are effective mechanisms to integrate policies across government levels, with the latter also promoting public-government integration. Setback lines can be applied to enhance integration across landscape units. Marine spatial planning is a multi-faceted mechanism with the potential to promote all types of integration. Policy-makers should adopt the mechanisms that are suited to the type of integration needed. Results of this study also contribute to evidence-based coastal management by identifying the most common impediments related to the mechanisms of integration in the eight studied countries. Copyright © 2012 Elsevier B.V. All rights reserved.

  5. Challenges of communicating integrated water resource management in Zimbabwe

    Science.gov (United States)

    Marimbe, Simbiso; Manzungu, Emmanuel

    With the promulgation of the 1998 Water Act the Government of Zimbabwe took a decisive step to reform the country’s water sector, to bring it in line with contemporary socio-political realities obtaining in the country, and in tune with the philosophy of integrated water resources management. Researchers have reported a lack of awareness of the reforms, particularly among the black communities, who were considered not just as one of the target of the reforms, but the beneficiaries. This paper analyses why this has been the case. The paper makes a case for differentiating communication from information dissemination. Information refers to a set of data packaged for delivery to a receiver while communication involves a dialogue. This paper critiques communication strategies used to communicate water reforms in Zimbabwe, applying recent developments in communication theories. The argument in the paper is that there was a failure to communicate although there was some success in dissemination information about the reforms. If the situation is to be reversed then methods that involve audience analysis may have to be used. Such methods tend to be expensive and time consuming--however, there is no substitute to this if integrated water resources management is to be institutionalised among the various stakeholders.

  6. Integrated care: theory to practice.

    Science.gov (United States)

    Stokes, Jonathan; Checkland, Kath; Kristensen, Søren Rud

    2016-10-01

    'Integrated care' is pitched as the solution to current health system challenges. In the literature, what integrated care actually involves is complex and contested. Multi-disciplinary team case management is frequently the primary focus of integrated care when implemented internationally. We examine the practical application of integrated care in the NHS in England to exemplify the prevalence of the case management focus. We look at the evidence for effectiveness of multi-disciplinary team case management, for the focus on high-risk groups and for integrated care more generally. We suggest realistic expectations of what integration of care alone can achieve and additional research questions. © The Author(s) 2016.

  7. Integrated environment, safety, and health management system description

    International Nuclear Information System (INIS)

    Zoghbi, J. G.

    2000-01-01

    The Integrated Environment, Safety, and Health Management System Description that is presented in this document describes the approach and management systems used to address integrated safety management within the Richland Environmental Restoration Project

  8. Integrated waste management - Looking beyond the solid waste horizon

    International Nuclear Information System (INIS)

    Seadon, J.K.

    2006-01-01

    Waste as a management issue has been evident for over four millennia. Disposal of waste to the biosphere has given way to thinking about, and trying to implement, an integrated waste management approach. In 1996 the United Nations Environmental Programme (UNEP) defined 'integrated waste management' as 'a framework of reference for designing and implementing new waste management systems and for analysing and optimising existing systems'. In this paper the concept of integrated waste management as defined by UNEP is considered, along with the parameters that constitute integrated waste management. The examples used are put into four categories: (1) integration within a single medium (solid, aqueous or atmospheric wastes) by considering alternative waste management options (2) multi-media integration (solid, aqueous, atmospheric and energy wastes) by considering waste management options that can be applied to more than one medium (3) tools (regulatory, economic, voluntary and informational) and (4) agents (governmental bodies (local and national), businesses and the community). This evaluation allows guidelines for enhancing success: (1) as experience increases, it is possible to deal with a greater complexity; and (2) integrated waste management requires a holistic approach, which encompasses a life cycle understanding of products and services. This in turn requires different specialisms to be involved in the instigation and analysis of an integrated waste management system. Taken together these advance the path to sustainability

  9. The problem of institutional fit in integrated water resources management: A case of Zimbabwe’s Mazowe catchment

    Science.gov (United States)

    Chereni, A.

    Integrated Water Resources Management (IWRM) concepts have now been accepted in various contexts and efforts are now being made to implement these concepts. Zimbabwe adopted and indigenized IWRM within the 1990s Water Reforms and stakeholder institutions designed to engender cross-sectoral efforts are now in place. Using evidence from Mazowe Catchment, this paper observes that far from fostering integration, institutions involved in water resources management are multiple, disparate and discordant. In practice, associational relationships - specifications of mandate based roles, lines and direction of accountability and evaluation criteria - of institutions intended to foster sectoral integration in natural resources management are not defined. These poorly defined associational relationships coupled with a dearth of a catchment management and development outline plan have translated into a lack of compulsion of duty among institutions. The study derives its evidence from a blend of qualitative unstructured interviews, participant observation and secondary sources. Although the weaknesses of IWRM are more contextual, it is argued, there are certain weaknesses that are also conceptual. IWRM, it is argued, has to contend with a growing plethora of methodological and motivational questions. Whilst it is agreeable within IWRM discourse that institutions need to be integrated, in practice, the approach falls short of a methodological approach that addresses ways in which the various aspects of these disparate institutions could be harmonized. The paper suggests that associational relationships or modes of interaction among institutions need to be defined. This definition should be based on a catchment development master plan.

  10. Integrated Computer System of Management in Logistics

    Science.gov (United States)

    Chwesiuk, Krzysztof

    2011-06-01

    This paper aims at presenting a concept of an integrated computer system of management in logistics, particularly in supply and distribution chains. Consequently, the paper includes the basic idea of the concept of computer-based management in logistics and components of the system, such as CAM and CIM systems in production processes, and management systems for storage, materials flow, and for managing transport, forwarding and logistics companies. The platform which integrates computer-aided management systems is that of electronic data interchange.

  11. Integrated management systems

    DEFF Research Database (Denmark)

    Jørgensen, Tine Herreborg; Remmen, Arne; Mellado, M. Dolores

    2006-01-01

    Different approaches to integration of management systems (ISO 9001, ISO 14001, OHSAS 18001 and SA 8000) with various levels of ambition have emerged. The tendency of increased compatibility between these standards has paved the road for discussions of, how to understand the different aspects of ...

  12. Case Managers on the Front Lines of Ethical Dilemmas: Advocacy, Autonomy, and Preventing Case Manager Burnout.

    Science.gov (United States)

    Sortedahl, Charlotte; Mottern, Nina; Campagna, Vivian

    The purpose of this article is to examine how case managers are routinely confronted by ethical dilemmas within a fragmented health care system and given the reality of financial pressures that influence life-changing decisions. The Code of Professional Conduct for Case Managers (Code), published by the Commission for Case Manager Certification, acknowledges "case managers may often confront ethical dilemmas" (Code 1996, Rev. 2015). The Code and expectations that professional case managers, particularly those who are board certified, will uphold ethical and legal practice apply to case managers in every practice setting across the full continuum of health care. This discussion acknowledges the ethical dilemmas that case managers routinely confront, which empowers them to seek support, guidance, and resources to support ethical practice. In addition, the article seeks to raise awareness of the effects of burnout and moral distress on case managers and others with whom they work closely on interdisciplinary teams.

  13. Integrated Urban Water Quality Management

    DEFF Research Database (Denmark)

    Rauch, W.; Harremoës, Poul

    1995-01-01

    The basic features of integrated urban water quality management by means of deterministic modeling are outlined. Procedures for the assessment of the detrimental effects in the recipient are presented as well as the basic concepts of an integrated model. The analysis of a synthetic urban drainage...... system provides useful information for water quality management. It is possible to identify the system parameters that contain engineering significance. Continuous simulation of the system performance indicates that the combined nitrogen loading is dominated by the wastewater treatment plant during dry...

  14. Supply chain integration, risk management and manufacturing flexibility

    DEFF Research Database (Denmark)

    Chaudhuri, Atanu; Boer, Harry; Taran, Yariv

    2018-01-01

    , respectively, and manufacturing flexibility. Design/methodology/approach – Using hierarchical regression, data are analyzed from a sample of 343 manufacturing plants in Asia collected in 2013-2014 as part of the International Manufacturing Strategy Survey (IMSS VI). Findings – Internal integration and supply......Purpose – The purpose of this paper is to investigate the impact of internal integration, external integration and supply chain risk management on manufacturing flexibility, and the moderating effect of supply chain risk management on the relationships between internal and external integration...... chain risk management have a direct effect on manufacturing flexibility. Supply chain risk management moderates the relationship between external integration and flexibility. Research limitations/implications – Further research is needed to generalize beyond the flexibility performance of discrete...

  15. Research on monitoring and management information integration technique in waste treatment and management

    International Nuclear Information System (INIS)

    Kong Jinsong; Yu Ren; Mao Wei

    2013-01-01

    The integration of the waste treatment process and the device status monitoring information and management information is a key problem required to be solved in the information integration of the waste treatment and management. The main content of the monitoring and management information integration is discussed in the paper. The data exchange techniques, which are based on the OPC, FTP and data push technology, are applied to the different monitoring system respectively, according to their development platform, to realize the integration of the waste treatment process and device status monitoring information and management information in a waste treatment center. (authors)

  16. Marketing and strategic management: integrating skills for a better hospital.

    Science.gov (United States)

    Hunter, S S

    1987-05-01

    Participants in a 1985 one-day seminar sponsored by the American Hospital Association's Society for Hospital Planning and Marketing were asked two questions: How many of the hospitals represented here have conducted marketing surveys in the recent past? How many of you were satisfied with the results of the survey or could integrate it into the strategic management of your institution? While all but two of the 125 participants answered yes to the first question, only two responded affirmatively to the second. A gap between having a survey done and implementing the results had been identified. The administrators had probably rushed into "marketing" with little forethought and even less effort to comprehend how this management skill fits into existing institutional skills, capabilities, roles, and goals. To close the gap between marketing theory and practice an institution must adopt a more far-reaching, proactive stance toward integrating marketing into the management routine at an early stage. This article presents a case study that may help health care administrators rethink the role of marketing in management and its place in the sequence of strategic decision making for their institution.

  17. "Since I have my case manager, I am back to life" case management in Croatia.

    Science.gov (United States)

    Gruber, Ema N; Ivezić-Strkalj, Sladana; Agius, Mark; Martić-Biocina, Sanja

    2008-03-01

    The authors present a case report of a patient who was treated by a case manager, a member of a Croatian Community Mental Health (CMH) Team, following the recommendations of WHO 2004 as well as the IRIS guidelines and the Basic Standards for Management of Patients with Serious Mental Illness in the Community (Agius 2005) and using the elements of Clinical case management (Muser 1998), Assertive community treatment model (Burns 1995, Scott 1995, Wolfsan 1990), the personal strength model (Rapp 1988) and Rehabilitation model (Anthony 1993). In order to emphasize the importance of the therapist-patient relationship in the treatment of chronic schizophrenic patients (Ivezic 2001) and creating the group atmosphere a Croatian model of case management is created where the patient's needs and risks are assessed by a multidisciplinary team which also conducts the recommended psychosocial interventions plan. The majority of interventions are conducted in groups. The case manager develops a confident relationship with a patient, nourishes the positive transference and aids the delivery of the treatment. The main goals of the interventions are empowerment of the patient, improvement of his abilities and decreasing of disabilities. The case manager also carries out a full assessment of the needs of the patient's family so that the family or carers are also included in the treatment or support if necessary (Gruber 2006). A case report of a patient and the work of her case manager as well as the case manager's diary (Gruber 2007) and the Croatian model of case management is presented in this article.

  18. Integrated management systems in the nuclear field

    International Nuclear Information System (INIS)

    Beckmerhagen, I.A.; Berg, H.P.; Karapetrovic, S.V.; Willborn, W.O.

    2005-01-01

    In the last years several internationally accepted standards such as the ISO 9000 and ISO 14000 series and other function-specific management systems standards have been developed. At the same time, it has become imperative for organisations to continuously improve their overall quality, environmental and safety performance. Therefore, the need to create integrated management systems is of growing importance to enable an easier handling of the different management systems. This paper has two main objectives. The first one is to address the key issues in the underlying theory of integrated management systems including benefits and limits, the second one is to illustrate the importance of an integrated (in particular safety) management system and the experience feedback providing examples from different areas and different organisations in the nuclear field. (orig.)

  19. Integrating socio-economic and biophysical data to enhance watershed management and planning

    Science.gov (United States)

    Pirani, Farshad Jalili; Mousavi, Seyed Alireza

    2016-09-01

    Sustainability has always been considered as one of the main aspects of watershed management plans. In many developing countries, watershed management practices and planning are usually performed by integrating biophysical layers, and other existing layers which cannot be identified as geographic layers are ignored. We introduce an approach to consider some socioeconomic parameters which are important for watershed management decisions. Ganj basin in Chaharmahal-Bakhtiari Province was selected as the case study area, which includes three traditional sanctums: Ganj, Shiremard and Gerdabe Olya. Socioeconomic data including net agricultural income, net ranching income, population and household number, literacy rate, unemployment rate, population growth rate and active population were mapped within traditional sanctums and then were integrated into other biophysical layers. After overlaying and processing these data to determine management units, different quantitative and qualitative approaches were adopted to achieve a practical framework for watershed management planning and relevant plans for homogeneous units were afterwards proposed. Comparing the results with current plans, the area of allocated lands to different proposed operations considering both qualitative and quantitative approaches were the same in many cases and there was a meaningful difference with current plans; e.g., 3820 ha of lands are currently managed under an enclosure plan, while qualitative and quantitative approaches in this study suggest 1388 and 1428 ha to be allocated to this operation type, respectively. Findings show that despite the ambiguities and complexities, different techniques could be adopted to incorporate socioeconomic conditions in watershed management plans. This introductory approach will help to enhance watershed management decisions with more attention to societal background and economic conditions, which will presumably motivate local communities to participate in

  20. Apotemnophilia or body integrity identity disorder: a case report review.

    Science.gov (United States)

    Bou Khalil, Rami; Richa, Sami

    2012-12-01

    Apotemnophilia or body integrity identity disorder (BIID) denotes a syndrome in which a person is preoccupied with the desire to amputate a healthy limb. In this report, we review the available case reports in the literature in order to enhance psychiatrists' and physicians' comprehension of this disorder. A search for the case reports available via MEDLINE was done since the first case report published by Money et al in 1977 till May 2011, using the following terms: apotemnophilia, self-demand amputation, body integrity identity disorder, and BIID. In all, 14 case reports were found relevant to our search. The desire to amputate one's healthy limb seems to be related to a major disturbance in the person's perception of one's own identity, where limb amputation can relieve temporarily the patient's feeling of distress without necessarily and uniformly adjusting the patient's own identity misperception. More investigations are needed in this domain in order to develop noninvasive treatment strategies that approach this aspect of the patient's distress within a globalist perspective. In addition, the health professionals' awareness regarding this disorder is required to ensure professional management of patients' suffering.

  1. How different institutional arrangements promote integrated river basin management

    DEFF Research Database (Denmark)

    Nielsen, Helle Ørsted; Frederiksen, Pia; Saarikoski, Heli

    2013-01-01

    Management Planning processes in six countries around the Baltic Sea. We use theories on multi-level governance, regime interplay and institutional effectiveness. We find that, in most cases, central governments have played a dominant role in the formulation of river basin management plans, while local......, member states must therefore address both the roles of different institutional actors and the interplay among institutions. In this paper, we will explore strengths and weaknesses of different institutional arrangements for integrated water management through a comparative analysis of River Basin...... influence has been somewhat limited. The tight procedural deadlines of the di-rective appear to have pushed for more centralisation than originally intended by the countries. But the analysis also shows that interplay mechanisms such as norms, ideas and incentives do promote effective institutional...

  2. Efficient Assessment of the Environment for Integral Urban Water Management

    Science.gov (United States)

    Rost, Grit; Londong, Jörg

    2015-04-01

    required subjects/disciplines implies first sight expert knowledge or provided open access data. In the case of the need for a more detailed screening the next steps consist of scientifically based analysis and legal statutory analysis. Indexes (indicators) or benchmarks for each assessment scale will be summarized and linked to suitable measures. The trans- and interdisciplinary approach makes sure that technical, informative and administrative measures will be involved. A rating between the current situation and the determined target situation will help for effective derivation of measures. Conclusion: The claim of the stepwise assessment is to make the data possible to handle, and to summarize the knowledge of expert's effective environmental assessment methods. The universe, comprehensive assessment will be feasible by using the toolbox. The toolbox will be a planning tool for sustainable urban water management and closed loop recycling water management. GWP, INBO (2009) A Handbook for Integrated Water Resources Management in Basins. 104. Karthe D, Heldt S, Rost G, et al (2014) Modular Concept for Municipal Water Management in the Kharaa River Basin, Mongolia. Environ. Sci. Price RK, Vojinović Z (2011) Urban Hydroinformatics Data, Models and Decision Support for Integrated Urban Water Management. 520. Rost G, Londong J, Dietze S, Osor G (2013) Integrated urban water management - an adapted management approach for planning and implementing measures: Case study area Darkhan , Kharaa catchment, Mongolia. Submitt to Environ Earth Sci 19. Stäudel J, Schalkwyk B Van, Gibbens M (2014) Methods and strategies for community-based enhancement & up-scaling of sanitation & waste management in peri-urban areas in South Africa. SANO. Rhombos-Verlag, Weimar, pp 1-13

  3. How labour organization may affect technology adoption: an analytical framework analysing the case of integrated pest management

    NARCIS (Netherlands)

    Beckmann, V.; Wesseler, J.H.H.

    2003-01-01

    Integrated Pest Management (IPM) is an important component of sustainable agriculture. Farmers who switch from a more capital-intensive pesticide-based pest management strategy to IPM have to substitute capital with labour. The adoption of IPM will therefore depend, among other things, on the

  4. Integrated Health Management Definitions

    Data.gov (United States)

    National Aeronautics and Space Administration — The Joint Army Navy NASA Air Force Modeling and Simulation Subcommittee's Integrated Health Management panel was started about 6 years ago to help foster...

  5. Policy entrepreneurs and structural influence in integrated community case management policymaking in Burkina Faso.

    Science.gov (United States)

    Shearer, Jessica C

    2015-12-01

    Policy entrepreneurs are individuals who attempt to influence the policy process and its outcomes through their opportunistic or incremental actions. Their success in the policy-making process has been associated with the convergence of four factors: behavioural traits; institutional factors; network position and political capital. Policy entrepreneurs have received little study in low- and middle-income country policy research despite observations of individualized decision-making, informal institutions and the unequal distribution and exercise of power in policymaking. This article aims to identify whether policy entrepreneurs were present in the policy process around integrated community case management (iCCM) in Burkina Faso, whether they were successful in achieving policy change, and whether success or failure can be explained using existing policy entrepreneur frameworks from high-income polities. This mixed methods policy study collected data from in-depth qualitative interviews and social network surveys of actors involved in iCCM policymaking [known locally as C-integrated management of childhood illness (IMCI)]; data were analysed based on the framework categories. Interview data pointed to one key individual who played a significant role in the inclusion of pneumonia treatment into the country's iCCM policy, an issue that had been a point of contention between government policy elites and development partners. Social network data confirmed that this actor was strategically located in the policy network to be able to reach the most other actors and to be able to control the flow of information. Although some development partner actors were as strategically located, none had the same level of authority or trust as was imbued by being a member of the government civil service. The entrepreneur's mid-level rank in the health ministry may have encouraged him/her to invest political capital and take risks that would not have been feasible or attractive to a

  6. Fire protection system management in nuclear facilities: strengthening factor of integrated management system - a case study; Gestao de sistema de protecao contra incendio em instalacoes nucleares: fator de fortalecimento do sistema de gestao integrada - um estudo de caso

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Joao Regis dos

    2005-07-01

    The present study investigated and analyzed the importance of a system of integrated safety manage, environment and health in a nuclear installation, having as perspective, the fire protection manage. The inquiry was made using a qualitative research involving a case study, where the considered environment was the Reconversion and UO{sub 2} Plant of the Industrias Nucleares do Brasil (INB), located in Resende, Rio de Janeiro and the studied population, the managers and the staff directly involved with the aspects related to the safety of the industrial complex of the related company. The motivation for the research was the search of a bigger interaction of the questions related to the safety, environment and health in the nuclear industry having, as axle of the investigation, the fire protection. As a result, it was observed that in a nuclear installation, although dealing with diversified safety processes, integration is possible and necessary, since there are more reasons for integration than otherwise. (author)

  7. Integrated Co-management of Lakes through Beach Management Units

    OpenAIRE

    Goverment of Uganda; Department for International Development (DFID) of the UK Government

    2007-01-01

    Metadata only record In 1999, the Integrated Co-management of Lakes through Beach Management Units project was started in an effort to implement a new approach to the management of lake resources in Uganda. The main components of this plan involved decentralization, local community management, and improving the livelihood of the poor. In order to finance the management of these areas, the Beach Management Units (BMU's) are charging user fees to those individuals who obtain benefit from the...

  8. Nuclear plant engineering work and integrated management system

    International Nuclear Information System (INIS)

    Ohkubo, Y.; Obata, T.; Tanaka, K.

    1992-01-01

    The Application of computers to the design, engineering, manufacturing and construction works of nuclear power plants has greatly contributed to improvement of productivity and reliability in the nuclear power plants constructed by Mitsubishi Nuclear Group for more than ten years. However, in most cases, those systems have been developed separately and utilized independently in different computer software and hardware environments and have not been fully utilized to achieve high efficiency and reliability. In order to drastically increase the productivity and efficiency, development of NUclear power plant engineering Work and INtegrated manaGement System (NUWINGS) started in 1987 to unify and integrate various conventional and developing systems using the state-of-the-art computer technology. The NUWINGS is almost completed and is now applied to actual plant construction. (author)

  9. Adaptive and integrated water management

    NARCIS (Netherlands)

    Pahl-Wostl, C.; Kabat, P.; Möltgen, J.

    2007-01-01

    Sustainable water management is a key environmental challenge of the 21st century. Developing and implementing innovative management approaches and how to cope with the increasing complexity and uncertainties was the theme of the first International Conference on Adaptive and Integrated Water

  10. Networking of integrated pest management

    NARCIS (Netherlands)

    Lamichhane, Jay Ram; Aubertot, Jean Noël; Begg, Graham; Birch, Andrew Nicholas E.; Boonekamp, Piet; Dachbrodt-Saaydeh, Silke; Hansen, Jens Grønbech; Hovmøller, Mogens Støvring; Jensen, Jens Erik; Jørgensen, Lise Nistrup; Kiss, Jozsef; Kudsk, Per; Moonen, Anna Camilla; Rasplus, Jean Yves; Sattin, Maurizio; Streito, Jean Claude; Messéan, Antoine

    2016-01-01

    Integrated pest management (IPM) is facing both external and internal challenges. External challenges include increasing needs to manage pests (pathogens, animal pests and weeds) due to climate change, evolution of pesticide resistance as well as virulence matching host resistance. The complexity

  11. THE PLACE OF OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM IN THE INTEGRATED MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Piotr Kafel

    2016-06-01

    Full Text Available The purpose of this paper is to analyze the place of occupational health and safety management system (OHSMS within the integrated management system. Implementation aspects of management systems are discussed, namely the different management system standards used for registration, for example ISO 14001, ISO 9001, OHSAS 18001, ISO 27001, the order in which they were implemented, the time required for each implementation, as well as the scope of integration of these management system standards into a single Integrated Management System and the level of integration. In order to do so, some of the results of a survey carried out in 81 organizations registered to at least two management systems selected from popular international standards, e.g.: ISO 9001, ISO 14001, OHSAS 18001, ISO/IEC 27001, ISO 22000 were used. OHSMS is not the system that is implemented as a first one. Usually it is implemented after or simultaneously with ISO 9001 and ISO 14001 standards. Time of implementation of MSSs in second and further round of implementation is shorter than during the implementation of first standards. There is a higher level of integration of implemented management standards in organizations where one of the standards in OHSMS, than in a companies without OHSMS. The paper analyses those sequences of management systems implementation of safety management systems with other system, that allow organizations to achieve higher levels of integration and presents a possible pattern for the companies initiating the integration process.

  12. Pipeline four-dimension management is the trend of pipeline integrity management in the future

    Energy Technology Data Exchange (ETDEWEB)

    Shaohua, Dong; Feifan; Zhongchen, Han [China National Petroleum Corporation (CNPC), Beijing (China)

    2009-07-01

    Pipeline integrity management is essential for today's operators to operate their pipelines safety and cost effectively. The latest developments of pipeline integrity management around the world are involved with change of regulation, industry standard and innovation of technology. And who know the trend of PIM in the future, which can be answered in the paper. As a result, the concept of P4DM was set up firstly in the world. The paper analyzed the pipeline HSE management, pipeline integrity management (PIM) and asset integrity management (AIM), the problem of management was produced, and also the Pipeline 4-dimension Management (P4DM) theory was brought forward. According to P4DM, from the hierarchy of P4DM, the management elements, fields, space and time was analyzed. The main content is P4DM integrate the space geography location and time, control and manage the pipeline system in whole process, anywhere and anytime. It includes the pipeline integrity, pipeline operation and emergency, which is integrated by IT system. It come true that the idea, solution, technology, organization, manager alternately intelligently control the process of management. What the paper talks about included the definition of pipeline 4D management, the research develop of P4DM, the theory of P4DM, the relationship between P4DM and PIM, the technology basis of P4DM, how to perform the P4DM and conclusion. The P4DM was produced, which provide the development direction of PIM in the future, and also provide the new ideas for PetroChina in the field of technology and management. (author)

  13. PENATAAN RUANG LAUT BERDASARKAN INTEGRATED COASTAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Dina Sunyowati

    2008-10-01

    Full Text Available The planning of coastal spatial arrangement must be put in the valid spatial planning system. Law Number 26 of 2007 on Spatial Planning and it is in fact related with land spatial planning, although that ocean and air spatial management will be arranged in separate law. The legal for coastal zone management is determined by using the principles of integrated coastal management by focusing on area or zone authority system. The integrated of coastal zones management regulations should be followed by the planning of coastal spatial arrange­ment. Therefore, certain synchronization at coastal zones governance is very important issue since by integrating and coordinating other related regulations and therefore conflict of norm can be minimized in the spatial planning coastal zone.

  14. Integrating care for older people with complex needs: key insights and lessons from a seven-country cross-case analysis.

    Science.gov (United States)

    Wodchis, Walter P; Dixon, Anna; Anderson, Geoff M; Goodwin, Nick

    2015-01-01

    To address the challenges of caring for a growing number of older people with a mix of both health problems and functional impairment, programmes in different countries have different approaches to integrating health and social service supports. The goal of this analysis is to identify important lessons for policy makers and service providers to enable better design, implementation and spread of successful integrated care models. This paper provides a structured cross-case synthesis of seven integrated care programmes in Australia, Canada, the Netherlands, New Zealand, Sweden, the UK and the USA. All seven programmes involved bottom-up innovation driven by local needs and included: (1) a single point of entry, (2) holistic care assessments, (3) comprehensive care planning, (4) care co-ordination and (5) a well-connected provider network. The process of achieving successful integration involves collaboration and, although the specific types of collaboration varied considerably across the seven case studies, all involved a care coordinator or case manager. Most programmes were not systematically evaluated but the two with formal external evaluations showed benefit and have been expanded. Case managers or care coordinators who support patient-centred collaborative care are key to successful integration in all our cases as are policies that provide funds and support for local initiatives that allow for bottom-up innovation. However, more robust and systematic evaluation of these initiatives is needed to clarify the 'business case' for integrated health and social care and to ensure successful generalization of local successes.

  15. Management & Communication: Project Management Case Study

    CERN Multimedia

    Nathalie Dumeaux

    2004-01-01

    We are pleased to announce the recent launch of a new workshop on Project Management. This is designed for People with budgetary, scheduling and/or organizational responsibilities in a project or a sub-project. The objectives through a management case study specially suited to CERN are: to become familiar with modern management techniques in use for structuring, planning, scheduling, costing and progress monitoring of a project or a sub-project. to understand in-depth issues associated with Deliverable-oriented Project Management, Earned Value Management, Advanced Project Cost Engineering and Project Risk Management. The full description of this workshop can be found here. The next session will be held on 8 October 2004. If you are interested in this workshop, please contact Nathalie Dumeaux, email or 78144. Programme of Seminars October to December 2004 Situation : 21.09.2004 Séminaires bilingues Dates Jours Places disponibles Project Management Case study 8 October 1 oui Intr...

  16. Locally Integrated Energy Sectors supported by renewable network management within municipalities

    International Nuclear Information System (INIS)

    Kostevšek, Anja; Petek, Janez; Čuček, Lidija; Klemeš, Jiří Jaromír; Varbanov, Petar Sabev

    2015-01-01

    The decarbonisation of energy systems is one of the important issues of the present energy policies. One of the ways of achieving this is to focus on local energy systems, thus ensuring as much as possible their heat and power self-sufficiency by applying local renewable resource integration and transformation of the renewable energy. Increasing the share of renewables within the local energy balance could be accomplished by using a variety of approaches. One possibility is combining the Locally Integrated Energy Sectors' concept with the novel management and organisation of a renewables-based network. As a first priority, the proposed comprehensive approach focuses on increasing the energy efficiency of municipal heat and power systems using the Locally Integrated Energy Sectors' concept, which is followed by the integration of renewable energy sources with the establishment of a renewable-based network. The proposed approach is illustrated by a case study of district heating based on wood biomass for the municipality Ormož, Slovenia by integrating various end-users from different sectors. - Highlights: • The paper presents a new approach for accelerated inception of RES in municipalities. • LIES with RES network increases energy efficiency and accelerates RES integration. • A demonstration case of district heating on wood biomass within Ormož was performed.

  17. Case analysis online: a strategic management case model for the health industry.

    Science.gov (United States)

    Walsh, Anne; Bearden, Eithne

    2004-01-01

    Despite the plethora of methods and tools available to support strategic management, the challenge for health executives in the next century will relate to their ability to access and interpret data from multiple and intricate communication networks. Integrated digital networks and satellite systems will expand the scope and ease of sharing information between business divisions, and networked systems will facilitate the use of virtual case discussions across universities. While the internet is frequently used to support clinical decisions in the healthcare industry, few executives rely upon the internetfor strategic analysis. Although electronic technologies can easily synthesize data from multiple information channels, research as well as technical issues may deter their application in strategic analysis. As digital models transform access to information, online models may become increasingly relevant in designing strategic solutions. While there are various pedagogical models available to support the strategic management process, this framework was designed to enhance strategic analysis through the application of technology and electronic research. A strategic analysis framework, which incorporated internet research and case analysis in a strategic managementcourse, is described alongwith design and application issues that emerged during the case analysis process.

  18. Towards eliminating malaria in high endemic countries: the roles of community health workers and related cadres and their challenges in integrated community case management for malaria: a systematic review.

    Science.gov (United States)

    Sunguya, Bruno F; Mlunde, Linda B; Ayer, Rakesh; Jimba, Masamine

    2017-01-03

    Human resource for health crisis has impaired global efforts against malaria in highly endemic countries. To address this, the World Health Organization (WHO) recommended scaling-up of community health workers (CHWs) and related cadres owing to their documented success in malaria and other disease prevention and management. Evidence is inconsistent on the roles and challenges they encounter in malaria interventions. This systematic review aims to summarize evidence on roles and challenges of CHWs and related cadres in integrated community case management for malaria (iCCM). This systematic review retrieved evidence from PubMed, CINAHL, ISI Web of Knowledge, and WHO regional databases. Terms extracted from the Boolean phrase used for PubMed were also used in other databases. The review included studies with Randomized Control Trial, Quasi-experimental, Pre-post interventional, Longitudinal and cohort, Cross-sectional, Case study, and Secondary data analysis. Because of heterogeneity, only narrative synthesis was conducted for this review. A total of 66 articles were eligible for analysis out of 1380 studies retrieved. CHWs and related cadre roles in malaria interventions included: malaria case management, prevention including health surveillance and health promotion specific to malaria. Despite their documented success, CHWs and related cadres succumb to health system challenges. These are poor and unsustainable finance for iCCM, workforce related challenges, lack of and unsustainable supply of medicines and diagnostics, lack of information and research, service delivery and leadership challenges. Community health workers and related cadres had important preventive, case management and promotive roles in malaria interventions. To enable their effective integration into the health systems, the identified challenges should be addressed. They include: introducing sustainable financing on iCCM programmes, tailoring their training to address the identified gaps

  19. The Challenge of Integrating OHS into Industrial Project Risk Management: Proposal of a Methodological Approach to Guide Future Research (Case of Mining Projects in Quebec, Canada

    Directory of Open Access Journals (Sweden)

    Adel Badri

    2015-06-01

    Full Text Available Although risk management tools are put to good use in many industrial sectors, some large projects have been met with numerous problems due to failure to take occupational health and safety (OHS into consideration. In spite of the high level of risk and uncertainty associated with many industrial projects, the number of studies of methods for managing all known risks systematically remains small. Under effervescent economic conditions, industries must meet several challenges associated with frequent project start-ups. In highly complex and uncertain environments, rigorous management of risk remains indispensable for avoiding threats to the success of projects. Many businesses seek continually to create and improve integrated approaches to risk management. This article puts into perspective the complexity of the challenge of integrating OHS into industrial project risk management. A conceptual and methodological approach is proposed to guide future research focused on meeting this challenge. The approach is based on applying multi-disciplinary research modes to a complex industrial context in order to identify all scenarios likely to contain threats to humans or the environment. A case study is used to illustrate the potential of the proposed approach for application and its contribution to meeting the challenge of taking OHS into consideration. On-site researchers were able to develop a new approach that helped two mining companies in Quebec (Canada to achieve successful integration of OHS into expansion projects.

  20. Knowledge and information management for integrated water resource management

    Science.gov (United States)

    Watershed information systems that integrate data and analytical tools are critical enabling technologies to support Integrated Water Resource Management (IWRM) by converting data into information, and information into knowledge. Many factors bring people to the table to participate in an IWRM fra...

  1. An Integrated Diagnostic Framework to Manage Organization Sustainable Growth: An Empirical Case

    Directory of Open Access Journals (Sweden)

    Jingxiao Zhang

    2016-03-01

    Full Text Available This research aims to develop a quantitative diagnostic framework by combining the Weisbord six-box model with the growth management model to focus on an organization’s internally driven sustainable management system. The research adopted an instrument developed by Preziosi and an extended Weisbord six-box model. The research employed a survey to collect 180 samples in a Chinese petrol company and applied the comparative method: (a the average score method; and (b the entropy method to confirm the growth level of the company. The survey also attempted to identify corresponding top growth influence factors using the obstacle degree formula. The results showed that the integrated diagnostic framework worked well to diagnose a regional but large Chinese petroleum company. In other words, the research successfully quantified the growth position and top influence factors and helped put forward specific suggestions to drive the organization of sustainable development. The method confirmed this organization during the fourth phase of five phases. In addition, top influence factors hindering the internal growth were (a the lack of task engagement with energy and time; (b the lack of personal work units; and (c a poor division of labor for reaching sustainable growth rates. The research provides a generic theoretical framework support to incorporate growth management models into an organizational diagnosis to obtain sustainable growth. It further highlights and practices guidelines in examining actual growth management levels in companies and discusses top influence factors to design efficient management systems to pursue organizational growth in a multitude of industrial contexts.

  2. Basic principles, contents, and benefits of an integrated management system

    International Nuclear Information System (INIS)

    Schwarzin, Juergen

    2010-01-01

    The basic principles and contents of an integrated management system are presented. The report focuses on the benefits and the experience accumulated in using an integrated management system. Integrated management systems are characterized by 2 features in particular: - On the one hand, by a system holistically controlling and describing all processes within a company which are necessary to achieve the company policy and company goals as defined. - On the other hand, it combines in one integrated management system various different aspects (such as quality, environmental protection, and safety) and the resulting requirements. Successful implementation of an integrated management system requires a clear commitment by company management to the integrated management system serving as a management tool. Implementation must be assigned the appropriate importance in the company. It must not be viewed as an instrument preserving 'status quo.' Instead, it must be seen as a tool for long-term improvement of the company. Application of the integrated management system minimizes the probability of occurrence of events, but is not able to reduce it to zero. (orig.)

  3. Integration of informal recycling sector in Brazil and the case of Sorocaba City.

    Science.gov (United States)

    Silva de Souza Lima, Nathalia; Mancini, Sandro Donnini

    2017-07-01

    Catadores are people who collect and sell materials that can be recycled. This activity has been done informally in many countries for years. Recently, a recognition process has begun for the informal recycling sector, with public and private initiatives. In Brazil, catadores started out associating with each other in co-operatives in the 1980s. In 2010, the Solid Waste National Policy was approved, promoting the inclusion of theses co-operatives in the formal waste management system. However, only in 25 out of 5670 Brazilian municipalities have hired co-operatives as Private Service Providers. The integration of the informal sector has contributed with social, economic and environmental benefits; income generation, reduction of poverty and resource preservation are highlights. Although there was a legal progress, there are great challenges for various actors involved. This paper aims to diagnose the informal recycling sector, emphasizing the integration process that has happened in Brazil. For this, a substantial literature review and a case study were conducted, applying the tool 'InteRa' to the case of Sorocaba. The case showed that it is possible to improve the integration of catadores in the formal waste management system. The co-operatives achieve recycling rates of 2%, higher than the official national rate of 1%. However, we estimate that autonomous pickers increase total recycling in Sorocaba to 9%, still short of the 25% target via source segregation. Therefore, continuing the integration process will benefit both the pickers, and also the municipality through savings on landfill costs.

  4. Integrated solid waste management in Germany

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This report covers Germany`s experience with integrated solid waste management programs. The municipal solid waste practices of four cities include practices and procedures that waste facility managers with local or state governments may consider for managing their own day-to-day operations.

  5. Transition Management: Case Study of an Energy Efficiency Technology Roadmap in Turkey

    Directory of Open Access Journals (Sweden)

    Şiir Kilkiş

    2014-12-01

    Full Text Available This paper integrates several streams of literature in transition management and proposes a holistic framework for its application in policy-making. Separate fields of study, such as motors of change and strategic intelligence tools, are unified in a single analytical process. The process involves five steps that may be repeated until a desired policy objective is achieved. The pilot, integrated technology roadmap process that has been launched in Turkey is analyzed as a case study. The Energy Efficiency Technology Roadmap has been completed with the participation of over 160 experts in 5 different stages. It involved the collection of over 349 Delfi statements, their consolidation for a Delfi survey with 16 statements, the analysis of the results, a focal group meeting to develop roadmaps for the 7 selected goals, and the consultation of the roadmaps to the sector. The paper concludes that an integrated technology roadmap process, as described in the pilot case study, provides an advanced version of transition management, which is needed to mobilize research, development, and innovation for sustainable development.

  6. "Tuberculosis Case Management" Training.

    Science.gov (United States)

    Knebel, Elisa; Kolodner, Jennifer

    2001-01-01

    The need to isolated health providers with critical knowledge in tuberculosis (TB) case management prompted the development of "Tuberculosis Case Management" CD-ROM. Features include "Learning Center,""Examination Room," and "Library." The combination of audio, video, and graphics allows participants to…

  7. Integrated management system laying a foundation for excellence

    Energy Technology Data Exchange (ETDEWEB)

    Brissette, S.; Vincent, D. [Bruce Power, Tiverton, Ontario (Canada)], E-mail: Derek.VINCENT@brucepower.com

    2009-07-01

    Integration in its simplest form involves seamless coordination between organizational elements such as organization structure, processes, systems and documents. This paper discusses the concept of integration in regards to managed systems and examines practical issues of marrying evolving standards to organizational design and overall governance. Bruce Power's experience in developing its Management System into a more integrated approach is described. Leadership sponsorship of an integrated programmatic approach using a Governance, Oversight, Support and Perform (GOSP) model of accountability framework within the Management System has been a critical success factor in Bruce Power's journey towards achieving operational excellence. (author)

  8. Integrated management system laying a foundation for excellence

    International Nuclear Information System (INIS)

    Brissette, S.; Vincent, D.

    2009-01-01

    Integration in its simplest form involves seamless coordination between organizational elements such as organization structure, processes, systems and documents. This paper discusses the concept of integration in regards to managed systems and examines practical issues of marrying evolving standards to organizational design and overall governance. Bruce Power's experience in developing its Management System into a more integrated approach is described. Leadership sponsorship of an integrated programmatic approach using a Governance, Oversight, Support and Perform (GOSP) model of accountability framework within the Management System has been a critical success factor in Bruce Power's journey towards achieving operational excellence. (author)

  9. Integrating workflow and project management systems for PLM applications

    Directory of Open Access Journals (Sweden)

    Fabio Fonseca Pereira de Paula

    2008-07-01

    Full Text Available The adoption of Product Life-cycle Management Systems (PLMs concept is fundamental to improve the product development, mainly to small and medium enterprises (SMEs. One of the challenges is the integration between project management and product data management functions. The paper presents an analysis of the potential integration strategies for a specifics product data management system (SMARTEAM and a project management system (Microsoft Project, which are commonly used for SMEs. Finally the article presents some considerations about the study of Project Management solutions in SMB’s companies, considering the PLM approach. Key-words: integration, project management (PM, workflow, PDM, PLM.

  10. iROCS: Integrated accident management framework for coping with beyond-design-basis external events

    International Nuclear Information System (INIS)

    Kim, Jaewhan; Park, Soo-Yong; Ahn, Kwang-Il; Yang, Joon-Eon

    2016-01-01

    Highlights: • An integrated mitigating strategy to cope with extreme external events, iROCS, is proposed. • The strategy aims to preserve the integrity of the reactor vessel as well as core cooling. • A case study for an extreme damage state is performed to assess the effectiveness and feasibility of candidate mitigation strategies under an extreme event. - Abstract: The Fukushima Daiichi accident induced by the Great East Japan earthquake and tsunami on March 11, 2011, poses a new challenge to the nuclear society, especially from an accident management viewpoint. This paper presents a new accident management framework called an integrated, RObust Coping Strategy (iROCS) to cope with beyond-design-basis external events (BDBEEs). The iROCS approach is characterized by classification of various plant damage conditions (PDCs) that might be impacted by BDBEEs and corresponding integrated coping strategies for each of PDCs, aiming to maintain and restore core cooling (i.e., to prevent core damage) and to maintain the integrity of the reactor pressure vessel if it is judged that core damage may not be preventable in view of plant conditions. From a case study for an extreme damage condition, it showed that candidate accident management strategies should be evaluated from the viewpoint of effectiveness and feasibility against accident scenarios and extreme damage conditions of the site, especially when employing mobile or portable equipment under BDBEEs within the limited time available to achieve desired goals such as prevention of core damage as well as a reactor vessel failure.

  11. Global challenges in integrated coastal zone management

    DEFF Research Database (Denmark)

    integration of data and information in policy and management, combining expertise from nature and social science, to reach a balanced and sustainable development of the coastal zone. This important book comprises the proceedings of The International Symposium on Integrated Coastal Zone Management, which took....../mitigation to change in coastal systems Coastal governance Linking science and management Comprising a huge wealth of information, this timely and well-edited volume is essential reading for all those involved in coastal zone management around the globe. All libraries in research establishments and universities where...

  12. How to integrate street-level bureaucracies into public management?

    DEFF Research Database (Denmark)

    Aagaard, Peter; Pedersen, John Storm

    the professionals in the public sector at the street-level such as social-workers, teachers, doctors, and other professionals have maintained autonomy regarding the provision, production and delivery of the specific core welfare services to the citizens as end users. By definition hard budget constraint...... and professionals´ autonomy do not fit well. To explore both theoretically and empirically the conflicts between hard budget constraint and professionals´ autonomy, the professionals´ provision, production and delivery of the services to the citizens with disability and socially disadvantaged people and the public...... management of the public spending on the services in Denmark is used as a case. Surprisingly, we find that the managers have been able to resolve the conflicts between the hard budget constraint and the professionals´ autonomy to a rather high degree. The managers have integrated the street...

  13. Integrated coastal management in Uruguay

    International Nuclear Information System (INIS)

    2011-01-01

    Integrated coastal management in Uruguay Carmelo includes the following areas-Nueva Palmira challenges and opportunities for local development in a context of large-scale industrial (Conchillas Uruguay), coastal management and stream Arroyo Solis Solis Chico Grande, Punta Colorada and Punta Negra, Maldonado Province Arroyo Valizas and sustainable tourism.

  14. Integrated Natural Resource Management in the Highlands of ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    1 janv. 2012 ... Integrated Natural Resource Management in the Highlands of Eastern Africa: ... goal of implementing an integrated approach to natural resource ... and the International Water Management Institute in Addis Ababa, Ethiopia.

  15. Lean environmental management integration system for sustainability of ISO 14001:2004 standard implementation

    Directory of Open Access Journals (Sweden)

    Perumal Puvanasvaran

    2014-10-01

    Full Text Available Purpose: The purpose of this study is to present a model for integrating Lean Principles with ISO 14001 Environmental Management System.Design/methodology/approach: To achieve the objective of the study, the methodology used in this study is based on preliminary literature review of ISO 14001 standards and Lean Principles as well as certain case reports from various proponents and authors of ISO 14001 and Lean as noted in various articles and journals and some books.Findings and Originality/value: The findings of this study are a new model called Lean Environmental Management Integration System (LEMIS has been developed and leads to the creation of these measurement standards for evaluating the organization, making its environmental efforts more realistic, focused and attainable.Research limitations/implications: Future research should be conducted case studies in this direction are required to be conducted for examining the feasibility of amalgamation and implementing ISO 14001:2004 standards with the philosophy of Lean Principles to enable the achievement of world class standards.Practical implications: This model helps to eliminate any wasteful processes in the organization’s implementation of the ISO 14001 standard thus leading to higher environmental performance.  Integrating the standard with Lean principles through LEMIS model helps to specify these performance measures making the standard achieve sustainability and continual improvement.Originality/value: This study presents a unique approach of integrating the two main models, namely Lean Principles and ISO 14001 Environmental Management System, as a single framework benefiting contemporary organizations.

  16. Integrated therapy safety management system.

    Science.gov (United States)

    Podtschaske, Beatrice; Fuchs, Daniela; Friesdorf, Wolfgang

    2013-09-01

    The aim is to demonstrate the benefit of the medico-ergonomic approach for the redesign of clinical work systems. Based on the six layer model, a concept for an 'integrated therapy safety management' is drafted. This concept could serve as a basis to improve resilience. The concept is developed through a concept-based approach. The state of the art of safety and complexity research in human factors and ergonomics forms the basis. The findings are synthesized to a concept for 'integrated therapy safety management'. The concept is applied by way of example for the 'medication process' to demonstrate its practical implementation. The 'integrated therapy safety management' is drafted in accordance with the six layer model. This model supports a detailed description of specific work tasks, the corresponding responsibilities and related workflows at different layers by using the concept of 'bridge managers'. 'Bridge managers' anticipate potential errors and monitor the controlled system continuously. If disruptions or disturbances occur, they respond with corrective actions which ensure that no harm results and they initiate preventive measures for future procedures. The concept demonstrates that in a complex work system, the human factor is the key element and final authority to cope with the residual complexity. The expertise of the 'bridge managers' and the recursive hierarchical structure results in highly adaptive clinical work systems and increases their resilience. The medico-ergonomic approach is a highly promising way of coping with two complexities. It offers a systematic framework for comprehensive analyses of clinical work systems and promotes interdisciplinary collaboration. © 2013 The Authors. British Journal of Clinical Pharmacology © 2013 The British Pharmacological Society.

  17. [The case manager--from words to deeds?].

    Science.gov (United States)

    Lindegaard, Birthe Rosenkrantz; Qvist, Peter

    2010-04-19

    Allocation of a case manager is now mandatory for both in- and outpatients in Denmark. Case manager allocation is reported quarterly to the regions and results are generally satisfying. Knowledge about fulfillment of the case manager role is, however, sparse. This study aims to examine the degree of fulfillment of the case manager role for a sample of inpatients. Two medical and two surgical wards participated. Patients were interviewed in relation to discharge while staff assigned as case managers completed a survey. Both patients and case managers answered questions regarding the defined roles as case managers: Planning/coordination, continuous information and discharge planning. 107 of 125 eligible patients were interviewed. Only 25 declared themselves informed about the allocation of a case manager. The patients' assessment of the service provided by the staff in relation to case manager tasks was generally good, but the services were seldom provided by the named case manager. 22% of patients did not experience continuous information, while only 13% did not experience a generally coherent stay in hospital. 110 case managers completed the survey. Less than half felt themselves well informed about the case manager role. Only a few case managers feel that they succeed in fulfilling the role, particularly regarding the participation in discharge planning. There seems to be a need for a targeted effort to improve the conditions for case managers in Danish hospitals in order to meet the intentions of this initiative.

  18. Integrated Natural Resource Management in the Highlands of ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2012-01-01

    Jan 1, 2012 ... Book cover Integrated Natural Resource Management in the ... with the common goal of implementing an integrated approach to natural resource ... and the International Water Management Institute in Addis Ababa, Ethiopia.

  19. Direct and indirect impacts of integrated pest management on pesticide use: a case of rice agriculture in Java, Indonesia.

    Science.gov (United States)

    Mariyono, Joko

    2008-10-01

    Integrated pest management (IPM) technology has been disseminated since 1989 in Indonesia to cut down pesticide use, but the adoption and diffusion of the technology are still debated. This study aims to estimate the models of demand for pesticides and to analyse the impact of IPM technology on pesticide use. Aggregate cross-section time series data from 1990-1998 are used. The results show that IPM technology reduces the use of pesticides by improving the process of rice production, such that pesticides are more efficiently used. In this case, the IPM technology is not a pest control technique. CONCLUSION There is an indication that IPM technology has been adopted by farmers. This is evidence that the IPM programme in Indonesia was successful in this area.

  20. Integrating natural and social sciences to manage sustainably vectors of change in the marine environment: Dogger Bank transnational case study

    Science.gov (United States)

    Burdon, Daryl; Boyes, Suzanne J.; Elliott, Michael; Smyth, Katie; Atkins, Jonathan P.; Barnes, Richard A.; Wurzel, Rüdiger K.

    2018-02-01

    The management of marine resources is a complex process driven by the dynamics of the natural system and the influence of stakeholders including policy-makers. An integration of natural and social sciences research is required by policy-makers to better understand, and manage sustainably, natural changes and anthropogenic activities within particular marine systems. Given the uncertain development of activities in the marine environment, future scenarios assessments can be used to investigate whether marine policy measures are robust and sustainable. This paper develops an interdisciplinary framework, which incorporates future scenarios assessments, and identifies four main types of evaluation needed to integrate natural and social sciences research to support the integrated management of the marine environment: environmental policy and governance assessments; ecosystem services, indicators and valuation; modelling tools for management evaluations, and risk assessment and risk management. The importance of stakeholder engagement within each evaluation method is highlighted. The paper focuses on the transnational spatial marine management of the Dogger Bank, in the central North Sea, a site which is very important ecologically, economically and politically. Current management practices are reviewed, and research tools to support future management decisions are applied and discussed in relation to two main vectors of change affecting the Dogger Bank, namely commercial fisheries and offshore wind farm developments, and in relation to the need for nature conservation. The input of local knowledge through stakeholder engagement is highlighted as a necessary requirement to produce site-specific policy recommendations for the future management of the Dogger Bank. We present wider policy recommendations to integrate natural and social sciences in a global marine context.

  1. Waste management - an integral part of environmental management systems

    Energy Technology Data Exchange (ETDEWEB)

    Hamm, Ulrich

    1998-12-01

    To consider waste as a resource instead of an annoyance with which the management has to cope with, has become an unavoidable task for modern managers. The task the management has to take to secure competitiveness in an environment of rising complexity of production processes and further increasing legal requirements, is to manage waste as much as other recourses are managed. Waste has to be considered an aspect of planning and decision process just as business plans or logistics are. Main themes discussed in this publication comprise waste management, implementation of waste management as an integral part of environmental management systems, and management approach to waste - the results. 4 figs.

  2. Management systems for high reliability organizations. Integration and effectiveness; Managementsysteme fuer Hochzuverlaessigkeitsorganisationen. Integration und Wirksamkeit

    Energy Technology Data Exchange (ETDEWEB)

    Mayer, Michael

    2015-03-09

    The scope of the thesis is the development of a method for improvement of efficient integrated management systems for high reliability organizations (HRO). A comprehensive analysis of severe accident prevention is performed. Severe accident management, mitigation measures and business continuity management are not included. High reliability organizations are complex and potentially dynamic organization forms that can be inherently dangerous like nuclear power plants, offshore platforms, chemical facilities, large ships or large aircrafts. A recursive generic management system model (RGM) was development based on the following factors: systemic and cybernetic Asepcts; integration of different management fields, high decision quality, integration of efficient methods of safety and risk analysis, integration of human reliability aspects, effectiveness evaluation and improvement.

  3. INTEGRATION OF ENVIRONMENTAL MANAGEMENT SYSTEM

    OpenAIRE

    Tomescu Ada Mirela

    2012-01-01

    The relevance of management as significant factor of business activity can be established on various management systems. These will help to obtain, organise, administrate, evaluate and control particulars: information, quality, environmental protection, health and safety, various resources (time, human, finance, inventory etc). The complexity of nowadays days development, forced us to think ‘integrated’. Sustainable development principles require that environment management policies and p...

  4. Integrated community case management for childhood illnesses: explaining policy resistance in Kenya.

    Science.gov (United States)

    Juma, Pamela A; Owuor, Karen; Bennett, Sara

    2015-12-01

    There has been a re-emphasis recently on community health workers to provide child health care services including integrated community case management for childhood illness (iCCM). This research analysed iCCM policy development in Kenya and in particular the types of decision-making criteria used by Kenyan policy-makers in considering whether to advance iCCM policy. Data were collected through document reviews (n = 41) and semi-structured interviews (n = 19) with key stakeholders in iCCM policy including government officials, development partners, bilateral donors, and civil society organizations. Initial analysis was guided by the policy triangle with further analysis of factors affecting policy decision-making drawing upon a simple framework developed by Grindle and Thomas (Policy makers, policy choices and policy outcomes: the political economy of reform in developing countries. 1989; Policy Sci 22: :213-48.). Policy development for iCCM has been slow in Kenya, compared with other Sub-Saharan African countries. At the time of the study, the Government had just completed the Community Health Training Manual which incorporated iCCM as a module, but this was the only formal expression of iCCM in Kenya. We found technical considerations, notably concerns about community health workers dispensing antibiotics to be a key factor slowing iCCM policy development, but this also overlapped with bureaucratic considerations, such as how the development of community health worker cadres may affect clinicians, as well as initial concerns about how an integrated approach might affect vertically oriented programs. International actors through agreements such as the Millennium Development Goals helped to get child survival onto the national policy agenda and such actors were active promoters of iCCM policy change. However international funders had not committed funding to scale-up iCCM policy, and this probably constrained their influence over iCCM policy debate. Kenyan actors

  5. Managing for Organizational Integrity.

    Science.gov (United States)

    Paine, Lynn Sharp

    1994-01-01

    Compliance-based ethics programs focus on prevention, detection, and punishment. Companies should adopt an integrity-based approach to ethics management that combines a concern for the law with an emphasis on managerial responsibility for ethical behavior. (JOW)

  6. Integrated, regional approach to risk management of industrial systems

    International Nuclear Information System (INIS)

    Chakraborty, S.

    1992-01-01

    This paper focuses on the following four main issues: (1) necessity for an integrated, regional approach to risk management of industrial systems; (2) principles of risk management; (3) integrated approach and overall methodology; and (4) implementation of risk management strategies on a regional basis. The U.N. Interagency project on risk management for large industrial areas, which is a pioneer type of international initiative for an integrated approach to risk management, is discussed in this context. Another encouraging activity for further development of overall methodologies for risk management is the ongoing project on the risk and safety of technical systems at the Swiss Federal Institute of Technology in Aurich. The concept of integral risk management takes into account multidimensional factors including technical, economic, political, social, and ethical considerations to allow a well-balanced decision-making process

  7. A Model of Functional Integration and Conflict: The Case of Purchasing-Production in a Construction Company

    DEFF Research Database (Denmark)

    Ellegaard, Chris; Koch, Christian

    2014-01-01

    into cross-functional conflict. Facing a conflicting functional relationship, managers must resort to conflict resolution methods, instead of attempting to integrate, as several integrative devices are not appropriate in conflicting interfaces. Originality/value – The proposed model contributes by connecting......Purpose – The purpose of this article is to generate theory on how functional integration and conflict interrelate by studying the interface between production and purchasing. Design/methodology/approach – An interpretive single case research methodology is adopted. The authors rely on in......-depth interviewing of managers in the production and purchasing functions of a construction company, as well as by its suppliers. Findings – Given low functional integration, antagonistic reasoning within each function and resultant conflicting behaviors are allowed to develop in a negative cycle, escalating...

  8. Case management for high-intensity service users: towards a relational approach to care co-ordination.

    Science.gov (United States)

    McEvoy, Phil; Escott, Diane; Bee, Penny

    2011-01-01

    This study is based on a formative evaluation of a case management service for high-intensity service users in Northern England. The evaluation had three main purposes: (i) to assess the quality of the organisational infrastructure; (ii) to obtain a better understanding of the key influences that played a role in shaping the development of the service; and (iii) to identify potential changes in practice that may help to improve the quality of service provision. The evaluation was informed by Gittell's relational co-ordination theory, which focuses upon cross-boundary working practices that facilitate task integration. The Assessment of Chronic Illness Care Survey was used to assess the organisational infrastructure and qualitative interviews with front line staff were conducted to explore the key influences that shaped the development of the service. A high level of strategic commitment and political support for integrated working was identified. However, the quality of care co-ordination was variable. The most prominent operational factor that appeared to influence the scope and quality of care co-ordination was the pattern of interaction between the case managers and their co-workers. The co-ordination of patient care was much more effective in integrated co-ordination networks. Key features included clearly defined, task focussed, relational workspaces with interactive forums where case managers could engage with co-workers in discussions about the management of interdependent care activities. In dispersed co-ordination networks with fewer relational workspaces, the case managers struggled to work as effectively. The evaluation concluded that the creation of flexible and efficient task focused relational workspaces that are systemically managed and adequately resourced could help to improve the quality of care co-ordination, particularly in dispersed networks. © 2010 Blackwell Publishing Ltd.

  9. Integrated frameworks for assessing and managing health risks in the context of managed aquifer recharge with river water.

    Science.gov (United States)

    Assmuth, Timo; Simola, Antti; Pitkänen, Tarja; Lyytimäki, Jari; Huttula, Timo

    2016-01-01

    Integrated assessment and management of water resources for the supply of potable water is increasingly important in light of projected water scarcity in many parts of the world. This article develops frameworks for regional-level waterborne human health risk assessment of chemical and microbiological contamination to aid water management, incorporating economic aspects of health risks. Managed aquifer recharge with surface water from a river in Southern Finland is used as an illustrative case. With a starting point in watershed governance, stakeholder concerns, and value-at-risk concepts, we merge common methods for integrative health risk analysis of contaminants to describe risks and impacts dynamically and broadly. This involves structuring analyses along the risk chain: sources-releases-environmental transport and fate-exposures-health effects-socio-economic impacts-management responses. Risks attributed to contaminants are embedded in other risks, such as contaminants from other sources, and related to benefits from improved water quality. A set of models along this risk chain in the case is presented. Fundamental issues in the assessment are identified, including 1) framing of risks, scenarios, and choices; 2) interaction of models and empirical information; 3) time dimension; 4) distributions of risks and benefits; and 5) uncertainties about risks and controls. We find that all these combine objective and subjective aspects, and involve value judgments and policy choices. We conclude with proposals for overcoming conceptual and functional divides and lock-ins to improve modeling, assessment, and management of complex water supply schemes, especially by reflective solution-oriented interdisciplinary and multi-actor deliberation. © 2015 SETAC.

  10. Integrated ageing management of Atucha NPP

    International Nuclear Information System (INIS)

    Ranalli, Juan M.; Marchena, Martin H.; Zorrilla, Jorge R.; Antonaccio, Elvio E.; Brenna, Pablo; Yllanez, Daniela; Cruz, Gerardo Vera de la; Luraschi, Carlos; Sabransky, Mario

    2013-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor, twice as big as Atucha I finishing a delayed construction. With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  11. Integrated Ageing Management of Atucha NPP

    International Nuclear Information System (INIS)

    Ranalli, J.M.; Marchena, M.H.; Zorrilla, J.R.; Sabransky, M.

    2012-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor twice as big as Atucha I finishing a delayed construction . With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  12. Integrated ageing management of Atucha NPP

    Energy Technology Data Exchange (ETDEWEB)

    Ranalli, Juan M.; Marchena, Martin H.; Zorrilla, Jorge R.; Antonaccio, Elvio E.; Brenna, Pablo; Yllanez, Daniela; Cruz, Gerardo Vera de la; Luraschi, Carlos, E-mail: ranalli@cnea.gov.ar [Gerencia Coordinacion Proyectos CNEA-NASA, Comision Nacional de Energia Atomica, Buenos Aires (Argentina); Sabransky, Mario, E-mail: msabransky@na-sa.com.ar [Departamento Gestion de Envejecimiento, Central Nuclear Atucha I-II Nucleoelectrica Argentina S.A., Provincia de Buenos Aires (Argentina)

    2013-07-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor, twice as big as Atucha I finishing a delayed construction. With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  13. DNV RP-F116 integrity management of submarine pipeline system

    Energy Technology Data Exchange (ETDEWEB)

    Leinum, B.H.; Etterdal, B. [Det Norske Veritas (DNV), Hoevik (Norway); Augustinovic, Z. [Dong Energy, Fredericia (Denmark); Paula, A. [Det Norske Veritas (DNV), Rio de Janeiro, RJ (Brazil)

    2009-12-19

    The need to keep pipelines operating safely and efficiently is paramount for any operator. Additionally, there is an increasing awareness at both regulatory and public level. Authorities around the world are adopting a more proactive approach as they seek to minimize the risk of human injuries or harm to the environment resulting from pipeline leaks. A joint industry project (JIP) led by DNV Energy is formulating guidelines for how to manage the integrity of submarine pipeline system. The resultant document of recommended practice, DNV RP-F116, will provide the oil and gas industry with a useful tool in an area where no such formal guidance currently exists. This paper gives an overview of the RP and demonstrates the use with a case study for the Siri field. The Siri field is operated by DONG Energy, Denmark and all infield pipelines were subjected to an integrity assessment using the Integrity Management process as outlined in the upcoming DNV RP-116. In parallel with establishing the RP, DNV has further developed the web-based software system, Orbit+, which is aligned with the RP. The software system is implemented and used by Dong Energy. (author)

  14. Case manager satisfaction in public health.

    Science.gov (United States)

    Schutt, Russell K; Fawcett, Jacqueline; Gall, Gail B; Harrow, Brooke; Woodford, Mary Lou

    2010-01-01

    The purpose of this study was to examine correlates of case managers' satisfaction with their work, services, and service network and to identify connections to service performance and service costs. A decentralized public health program that exemplifies the trend toward more diverse clients and networked services. A mixed method design with 34 case managers. As hypothesized, the case managers' experiences with clients and the service network, and their service effectiveness, were associated with their satisfaction with their jobs and the services they provide. Satisfaction was also positively associated with more timely service delivery. These associations were explained in part by case managers' education and training. Case managers can achieve high levels of job and service satisfaction in outreach programs serving a diverse client population in a decentralized service network. Case managers' job and service satisfaction improves with reduced service problems and service delays and when case managers can devise work-arounds for persistent service problems. Using advanced practice nurses (APN) and providing more on-the-job training may increase case manager satisfaction with their jobs and the services they provide. Special efforts may be needed to prevent a decline in job satisfaction with years of experience.

  15. Power management techniques for integrated circuit design

    CERN Document Server

    Chen, Ke-Horng

    2016-01-01

    This book begins with the premise that energy demands are directing scientists towards ever-greener methods of power management, so highly integrated power control ICs (integrated chip/circuit) are increasingly in demand for further reducing power consumption. * A timely and comprehensive reference guide for IC designers dealing with the increasingly widespread demand for integrated low power management * Includes new topics such as LED lighting, fast transient response, DVS-tracking and design with advanced technology nodes * Leading author (Chen) is an active and renowned contributor to the power management IC design field, and has extensive industry experience * Accompanying website includes presentation files with book illustrations, lecture notes, simulation circuits, solution manuals, instructors manuals, and program downloads.

  16. INTEGRATION OF ENVIRONMENTAL MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Tomescu Ada Mirela

    2012-07-01

    Full Text Available The relevance of management as significant factor of business activity can be established on various management systems. These will help to obtain, organise, administrate, evaluate and control particulars: information, quality, environmental protection, health and safety, various resources (time, human, finance, inventory etc. The complexity of nowadays days development, forced us to think ‘integrated’. Sustainable development principles require that environment management policies and practices are not good in themselves but also integrate with all other environmental objectives, and with social and economic development objectives. The principles of sustainable development involve that environment management policies and practices. These are not sound in them-self but also integrate with all other environmental objectives, and with social and economic development objectives. Those objectives were realized, and followed by development of strategies to effects the objective of sustainable development. Environmental management should embrace recent change in the area of environmental protection, and suit the recently regulations of the field -entire legal and economic, as well as perform management systems to meet the requirements of the contemporary model for economic development. These changes are trailed by abandon the conventional approach of environmental protection and it is replaced by sustainable development (SD. The keys and the aims of Cleaner Productions (CP are presented being implemented in various companies as a non-formalised environmental management system (EMS. This concept is suggested here as a proper model for practice where possible environmental harmful technologies are used -e.g. Rosia Montana. Showing the features and the power of CP this paper is a signal oriented to involve the awareness of policy-makers and top management of diverse Romanian companies. Many companies in European countries are developing

  17. ASPECTS OF INTEGRATION MANAGEMENT METHODS

    Directory of Open Access Journals (Sweden)

    Artemy Varshapetian

    2015-10-01

    Full Text Available For manufacturing companies to succeed in today's unstable economic environment, it is necessary to restructure the main components of its activities: designing innovative product, production using modern reconfigurable manufacturing systems, a business model that takes into account the global strategy and management methods using modern management models and tools. The first three components are discussed in numerous publications, for example, (Koren, 2010 and is therefore not considered in the article. A large number of publications devoted to the methods and tools of production management, for example (Halevi, 2007. On the basis of what was said in the article discusses the possibility of the integration of only three methods have received in recent years, the most widely used, namely: Six Sigma method - SS (George et al., 2005 and supplements its-Design for six sigm? - DFSS (Taguchi, 2003; Lean production transformed with the development to the "Lean management" and further to the "Lean thinking" - Lean (Hirano et al., 2006; Theory of Constraints, developed E.Goldratt - TOC (Dettmer, 2001. The article investigates some aspects of this integration: applications in diverse fields, positive features, changes in management structure, etc.

  18. Integrated Procurement Management System, Version II

    Science.gov (United States)

    Collier, L. J.

    1985-01-01

    Integrated Procurement Management System, Version II (IPMS II) is online/ batch system for collecting developing, managing and disseminating procurementrelated data at NASA Johnson Space Center. Portions of IPMS II adaptable to other procurement situations.

  19. Integrated farm sustainability assessment for the environmental management of rural activities

    International Nuclear Information System (INIS)

    Stachetii Rodrigues, Geraldo; Aparecida Rodrigues, Izilda; Almeida Buschinelli, Claudio Cesar de; Barros, Inacio de

    2010-01-01

    Farmers have been increasingly called upon to respond to an ongoing redefinition in consumers' demands, having as a converging theme the search for sustainable production practices. In order to satisfy this objective, instruments for the environmental management of agricultural activities have been sought out. Environmental impact assessment methods are appropriate tools to address the choice of technologies and management practices to minimize negative effects of agricultural development, while maximizing productive efficiency, sound usage of natural resources, conservation of ecological assets and equitable access to wealth generation means. The 'system for weighted environmental impact assessment of rural activities' (APOIA-NovoRural) presented in this paper is organized to provide integrated farm sustainability assessment according to quantitative environmental standards and defined socio-economic benchmarks. The system integrates sixty-two objective indicators in five sustainability dimensions - (i) Landscape ecology, (ii) Environmental quality (atmosphere, water and soil), (iii) Sociocultural values, (iv) Economic values, and (v) Management and administration. Impact indices are expressed in three integration levels: (i) specific indicators, that offer a diagnostic and managerial tool for farmers and rural administrators, by pointing out particular attributes of the rural activities that may be failing to comply with defined environmental performance objectives; (ii) integrated sustainability dimensions, that show decision-makers the major contributions of the rural activities toward local sustainable development, facilitating the definition of control actions and promotion measures; and (iii) aggregated sustainability index, that can be considered a yardstick for eco-certification purposes. Nine fully documented case studies carried out with the APOIA-NovoRural system, focusing on different scales, diverse rural activities/farming systems, and contrasting

  20. Integrated solid waste management of Scottsdale, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The subject document reports the results of an in-depth investigation of the fiscal year 1992 cost of the city of Scottsdale, Arizona, integrated municipal solid waste management (IMSWM) system, the energy consumed to operate the system, and the environmental performance requirements for each of the system`s waste-processing and disposal facilities. The document reports actual data from records kept by participants. Every effort was made to minimize the use of assumptions, and no attempt is made to interpret the data reported. Analytical approaches are documented so that interested analysts may per-form manipulation or further analysis of the data. As such, the report is a reference document for municipal solid waste (MSW) management professionals who are interested in the actual costs and energy consumption, for a 1-year period, of an operating IMSWM system. The report is organized into two main parts. The first part is the executive summary and case study portion of the report. The executive summary provides a basic description of the study area and selected economic and energy information. Within the case study are detailed descriptions of each component operating during the study period; the quantities of solid waste collected, processed, and marketed within the study boundaries; the cost of MSW in Scottsdale; an energy usage analysis; a review of federal, state, and local environmental requirement compliance; a reference section; and a glossary of terms. The second part of the report focuses on a more detailed discourse on the above topics. In addition, the methodology used to determine the economic costs and energy consumption of the system components is found in the second portion of this report. The methodology created for this project will be helpful for those professionals who wish to break out the costs of their own integrated systems.

  1. Innovation Management in Emerging Technology Ventures – The Concept of an Integrated Idea Management

    DEFF Research Database (Denmark)

    Brem, Alexander; Voigt, K.-I.

    2007-01-01

    , development and sales. Here especially, differentiating potentials are offered for emerging technology ventures. But it is important that idea and innovation management are integrated during the building-up stage while internal and external network structures are still manageable and often consist...... of the managers' and founders' personal contacts. Hence, the earlier an integrated idea management is implemented, the greater is the probability of high numbers of successful innovations.......For decades, suggestion systems have been used to include employees in the innovation process. However, in order to gather superior ideas, integrating external stakeholders is critical to the innovation success. Within this paper, the authors derive a sophisticated model of an integrated idea...

  2. Integrating the autonomous subsystems management process

    Science.gov (United States)

    Ashworth, Barry R.

    1992-01-01

    Ways in which the ranking of the Space Station Module Power Management and Distribution testbed may be achieved and an individual subsystem's internal priorities may be managed within the complete system are examined. The application of these results in the integration and performance leveling of the autonomously managed system is discussed.

  3. Integrating care for frequent users of emergency departments: implementation evaluation of a brief multi-organizational intensive case management intervention.

    Science.gov (United States)

    Kahan, Deborah; Leszcz, Molyn; O'Campo, Patricia; Hwang, Stephen W; Wasylenki, Donald A; Kurdyak, Paul; Wise Harris, Deborah; Gozdzik, Agnes; Stergiopoulos, Vicky

    2016-04-27

    Addressing the needs of frequent users of emergency departments (EDs) is a health system priority in many jurisdictions. This study describes stakeholder perspectives on the implementation of a multi-organizational brief intervention designed to support integration and continuity of care for frequent ED users with mental health and addictions problems, focusing on perceived barriers and facilitators to early implementation in a large urban centre. Coordinating Access to Care from Hospital Emergency Departments (CATCH-ED) is a brief case management intervention bridging hospital, primary and community care for frequent ED users experiencing mental illness and addictions. To examine barriers and facilitators to early implementation of this multi-organizational intervention, between July and October 2012, 47 stakeholders, including direct service providers, managers and administrators participated in 32 semi-structured qualitative interviews and one focus group exploring their experience with the intervention and factors that helped or hindered successful early implementation. Qualitative data were analyzed using thematic analysis. Stakeholders valued the intervention and its potential to support continuity of care for this population. Service delivery system factors, including organizational capacity and a history of collaborative relationships across the healthcare continuum, and support system factors, such as training and supervision, emerged as key facilitators of program implementation. Operational challenges included early low program referral rates, management of a multi-organizational initiative, variable adherence to the model among participating organizations, and scant access to specialty psychiatric resources. Factors contributing to these challenges included lack of dedicated staff in the ED and limited local system capacity to support this population, and insufficient training and technical assistance available to participating organizations. A multi

  4. Integrated management system - management standards evolution and the IAEA new approach

    International Nuclear Information System (INIS)

    Oliveira, Dirceu Paulo de; Zouain, Desiree Moraes

    2007-01-01

    The management standards application began in military and nuclear areas towards the end of Second World War, when some westerns countries developed quality standards to improve their means to assess suppliers' conditions to assure their products conformance, which was increasingly complex and required a higher degree of reliability. Afterwards, the quality standards application was extended to the consumer market focused on consumers' requirements satisfaction. Coming along the society crescent concern about quality of life, other management standards were developed, such as those dealing with environmental and sustainable development, occupational health and safety, social accountability and so on. As a consequence, the management process became complex. The management system integrated form approach makes possible the compatibility of distinct and complementary interests from several functions and disciplines involved and supply the absence of the organizations' holistic approach. According to this integrated management approach, the Agency - 'International Atomic Energy Agency' (IAEA) - decided to review the structure of the 50-C-Q standard - 'Quality Assurance for Safety in Nuclear Power Plants and Other Nuclear Installations', from 1996, publishing in 2006 the new GS-R-3 standard - 'The Management System for Facilities and Activities - Safety Requirements'. This work presents a brief evolution of management standards and integrated management approach, showing the Agency's new vision concerning this issue with the GS-R-3 standard publication. (author)

  5. [The hospital perspective: disease management and integrated health care].

    Science.gov (United States)

    Schrappe, Matthias

    2003-06-01

    Disease Management is a transsectoral, population-based form of health care, which addresses groups of patients with particular clinical entities and risk factors. It refers both to an evidence-based knowledge base and corresponding guidelines, evaluates outcome as a continuous quality improvement process and usually includes active participation of patients. In Germany, the implementation of disease management is associated with financial transactions for risk adjustment between health care assurances [para. 137 f, Book V of Social Code (SGB V)] and represents the second kind of transsectoral care, besides a program designed as integrated health care according to para. 140 a ff f of Book V of Social Code. While in the USA and other countries disease management programs are made available by several institutions involved in health care, in Germany these programs are offered by health care insurers. Assessment of disease management from the hospital perspective will have to consider three questions: How large is the risk to compensate inadequate quality in outpatient care? Are there synergies in internal organisational development? Can the risk of inadequate funding of the global "integrated" budget be tolerated? Transsectoral quality assurance by valid performance indicators and implementation of a quality improvement process are essential. Internal organisational changes can be supported, particularly in the case of DRG introduction. The economic risk and financial output depends on the kind of disease being focussed by the disease management program. In assessing the underlying scientific evidence of their cost effectiveness, societal costs will have to be precisely differentiated from hospital-associated costs.

  6. Integrated catchment modelling within a strategic planning and decision making process: Werra case study

    Science.gov (United States)

    Dietrich, Jörg; Funke, Markus

    Integrated water resources management (IWRM) redefines conventional water management approaches through a closer cross-linkage between environment and society. The role of public participation and socio-economic considerations becomes more important within the planning and decision making process. In this paper we address aspects of the integration of catchment models into such a process taking the implementation of the European Water Framework Directive (WFD) as an example. Within a case study situated in the Werra river basin (Central Germany), a systems analytic decision process model was developed. This model uses the semantics of the Unified Modeling Language (UML) activity model. As an example application, the catchment model SWAT and the water quality model RWQM1 were applied to simulate the effect of phosphorus emissions from non-point and point sources on water quality. The decision process model was able to guide the participants of the case study through the interdisciplinary planning and negotiation of actions. Further improvements of the integration framework include tools for quantitative uncertainty analyses, which are crucial for real life application of models within an IWRM decision making toolbox. For the case study, the multi-criteria assessment of actions indicates that the polluter pays principle can be met at larger scales (sub-catchment or river basin) without significantly compromising cost efficiency for the local situation.

  7. Improving Casing Integrity by Induction Brazing of Casing Connections

    NARCIS (Netherlands)

    Ernens, Dennis; Hariharan, Hari; van Haaften, Willem Maarten; Pasaribu, Rihard; Jabs, Matthew; McKim, Richard

    2017-01-01

    Brazing technology allows metallurgical joining of dissimilar materials using a filler material. In this paper brazing technology applied to casing connections is presented. The initial application was triggered by challenges with mechanical and pressure integrity after expansion of casing

  8. Idaho National Laboratory Integrated Safety Management System FY 2016 Effectiveness Review and Declaration Report

    International Nuclear Information System (INIS)

    Hunt, Farren J.

    2016-01-01

    Idaho National Laboratory's (INL's) Integrated Safety Management System (ISMS) effectiveness review of fiscal year (FY) 2016 shows that INL has integrated management programs and safety elements throughout the oversight and operational activities performed at INL. The significant maturity of Contractor Assurance System (CAS) processes, as demonstrated across INL's management systems and periodic reporting through the Management Review Meeting process, over the past two years has provided INL with current real-time understanding and knowledge pertaining to the health of the institution. INL's sustained excellence of the Integrated Safety and effective implementation of the Worker Safety and Health Program is also evidenced by other external validations and key indicators. In particular, external validations include VPP, ISO 14001, DOELAP accreditation, and key Laboratory level indicators such as ORPS (number, event frequency and severity); injury/illness indicators such as Days Away, Restricted and Transfer (DART) case rate, back & shoulder metric and open reporting indicators, demonstrate a continuous positive trend and therefore improved operational performance over the last few years. These indicators are also reflective of the Laboratory's overall organizational and safety culture improvement. Notably, there has also been a step change in ESH&Q Leadership actions that have been recognized both locally and complex-wide. Notwithstanding, Laboratory management continues to monitor and take action on lower level negative trends in numerous areas including: Conduct of Operations, Work Control, Work Site Analysis, Risk Assessment, LO/TO, Fire Protection, and Life Safety Systems, to mention a few. While the number of severe injury cases has decreased, as evidenced by the reduction in the DART case rate, the two hand injuries and the fire truck/ambulance accident were of particular concern. Aggressive actions continue in order to understand the causes and define actions

  9. Idaho National Laboratory Integrated Safety Management System FY 2016 Effectiveness Review and Declaration Report

    Energy Technology Data Exchange (ETDEWEB)

    Hunt, Farren J. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-12-01

    Idaho National Laboratory’s (INL’s) Integrated Safety Management System (ISMS) effectiveness review of fiscal year (FY) 2016 shows that INL has integrated management programs and safety elements throughout the oversight and operational activities performed at INL. The significant maturity of Contractor Assurance System (CAS) processes, as demonstrated across INL’s management systems and periodic reporting through the Management Review Meeting process, over the past two years has provided INL with current real-time understanding and knowledge pertaining to the health of the institution. INL’s sustained excellence of the Integrated Safety and effective implementation of the Worker Safety and Health Program is also evidenced by other external validations and key indicators. In particular, external validations include VPP, ISO 14001, DOELAP accreditation, and key Laboratory level indicators such as ORPS (number, event frequency and severity); injury/illness indicators such as Days Away, Restricted and Transfer (DART) case rate, back & shoulder metric and open reporting indicators, demonstrate a continuous positive trend and therefore improved operational performance over the last few years. These indicators are also reflective of the Laboratory’s overall organizational and safety culture improvement. Notably, there has also been a step change in ESH&Q Leadership actions that have been recognized both locally and complex-wide. Notwithstanding, Laboratory management continues to monitor and take action on lower level negative trends in numerous areas including: Conduct of Operations, Work Control, Work Site Analysis, Risk Assessment, LO/TO, Fire Protection, and Life Safety Systems, to mention a few. While the number of severe injury cases has decreased, as evidenced by the reduction in the DART case rate, the two hand injuries and the fire truck/ambulance accident were of particular concern. Aggressive actions continue in order to understand the causes and

  10. Managing Risk Areas in Software Development Offshoring: A CMMI Level 5 Case

    DEFF Research Database (Denmark)

    Persson, John Stouby; Schlichter, Bjarne Rerup

    2015-01-01

    Software companies are increasingly offshoring development to countries with high expertise at lower cost. Offshoring involves particular risk areas that if ignored increase the likelihood of failure. However, the offshoring client’s maturity level may influence the management of these risk areas....... Against this backdrop, we present an interpretive case study of how managers perceive and mitigate the risk areas in software development offshoring with a mature CMMI level 5 (Capability Maturity Model, Integrated) software company as the client. We find that managers perceive and mitigate most...

  11. Participatory Social-Ecological Modeling in Eutrophication Management: the Case of Himmerfjärden, Sweden

    Directory of Open Access Journals (Sweden)

    Frida Franzén

    2011-12-01

    Full Text Available Stakeholder participation is increasingly seen as central in natural resource management. It is also required by the European Union Water Framework Directive, which identifies three levels of participation; information, consultation, and active involvement. In this paper we discuss the active involvement of stakeholders, using our experience from a case study in the Himmerfjärden region, which is a coastal area southwest of Stockholm, Sweden. Our study used the systems approach proposed by the European Union research project called Science and Policy Integration for Coastal System Assessment (SPICOSA, in which local stakeholders and a study site team constructed an integrated simulation model of a crucial coastal management issue. In this case the issue was nitrogen enrichment. We showed how stakeholder participation in the modeling process helped identify interesting and currently relevant management scenarios, and how the modeling process facilitated communication of the likely ecological, economic, and social effects of these scenarios to the stakeholders. In addition, stakeholders also reported social gains in terms of network building. We managed to actively involve local stakeholders in water issues, and the research process clearly strengthened the social capital in the Himmerfjärden region, and created a basis for future collaboration regarding water management. Our experience indicates that the approach we tried is a useful tool for promoting active stakeholder involvement in water management projects. Also, the results of our science and policy integration approach indicated that the study site team assumed a leadership role, which is a commonly recognized factor in successful natural resource management.

  12. Project management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-12-01

    The Dallas Integrated Corridor Management System Demonstration Project is a multi-agency, de-centralized operation which will utilize a set of regional systems to integrate the operations of the corridor. The purpose of the Dallas ICM System is to im...

  13. Framework for integration of informal waste management sector with the formal sector in Pakistan.

    Science.gov (United States)

    Masood, Maryam; Barlow, Claire Y

    2013-10-01

    Historically, waste pickers around the globe have utilised urban solid waste as a principal source of livelihood. Formal waste management sectors usually perceive the informal waste collection/recycling networks as backward, unhygienic and generally incompatible with modern waste management systems. It is proposed here that through careful planning and administration, these seemingly troublesome informal networks can be integrated into formal waste management systems in developing countries, providing mutual benefits. A theoretical framework for integration based on a case study in Lahore, Pakistan, is presented. The proposed solution suggests that the municipal authority should draw up and agree on a formal work contract with the group of waste pickers already operating in the area. The proposed system is assessed using the integration radar framework to classify and analyse possible intervention points between the sectors. The integration of the informal waste workers with the formal waste management sector is not a one dimensional or single step process. An ideal solution might aim for a balanced focus on all four categories of intervention, although this may be influenced by local conditions. Not all the positive benefits will be immediately apparent, but it is expected that as the acceptance of such projects increases over time, the informal recycling economy will financially supplement the formal system in many ways.

  14. Risk Management from Corporate and FM Perspectives: Two case studies

    DEFF Research Database (Denmark)

    Ünver, Kadir; Jensen, Per Anker

    2012-01-01

    Purpose: To investigate how Risk Management (RM) is perceived and practiced in Facilities Management (FM) and corporate management and to evaluate the potential benefits of an increased application. Theory: RM is a generic management discipline, but apparently it has not achieved the attention...... as most critical in each company. Both companies could benefit from a more integrated application of RM covering both corporate management and FM. Originality/value: This is among the first descriptive studies looking at RM from both corporate and FM perspectives, which is essential to increase...... it deserves in FM. Application of RM in FM could help to increase the strategic importance and awareness of FM among corporate managers. Approach: A preliminary study with expert interviews was initially conducted followed by a main study with an interview survey in two Danish case companies - a real estate...

  15. Estimating the cost of referral and willingness to pay for referral to higher-level health facilities: a case series study from an integrated community case management programme in Uganda.

    Science.gov (United States)

    Nanyonjo, Agnes; Bagorogoza, Benson; Kasteng, Frida; Ayebale, Godfrey; Makumbi, Fredrick; Tomson, Göran; Källander, Karin

    2015-08-28

    Integrated community case management (iCCM) relies on community health workers (CHWs) managing children with malaria, pneumonia, diarrhoea, and referring children when management is not possible. This study sought to establish the cost per sick child referred to seek care from a higher-level health facility by a CHW and to estimate caregivers' willingness to pay (WTP) for referral. Caregivers of 203 randomly selected children referred to higher-level health facilities by CHWs were interviewed in four Midwestern Uganda districts. Questionnaires and document reviews were used to capture direct, indirect and opportunity costs incurred by caregivers, CHWs and health facilities managing referred children. WTP for referral was assessed through the 'bidding game' approach followed by an open-ended question on maximum WTP. Descriptive analysis was conducted for factors associated with referral completion and WTP using logistic and linear regression methods, respectively. The cost per case referred to higher-level health facilities was computed from a societal perspective. Reasons for referral included having fever with a negative malaria test (46.8%), danger signs (29.6%) and drug shortage (37.4%). Among the referred, less than half completed referral (45.8%). Referral completion was 2.8 times higher among children with danger signs (p = 0.004) relative to those without danger signs, and 0.27 times lower among children who received pre-referral treatment (p average cost per case referred was US$ 4.89 and US$7.35 per case completing referral. For each unit cost per case referred, caregiver out of pocket expenditure contributed 33.7%, caregivers' and CHWs' opportunity costs contributed 29.2% and 5.1% respectively and health facility costs contributed 39.6%. The mean (SD) out of pocket expenditure was US$1.65 (3.25). The mean WTP for referral was US$8.25 (14.70) and was positively associated with having received pre-referral treatment, completing referral and increasing

  16. DKIST facility management system integration

    Science.gov (United States)

    White, Charles R.; Phelps, LeEllen

    2016-07-01

    The Daniel K. Inouye Solar Telescope (DKIST) Observatory is under construction at Haleakalā, Maui, Hawai'i. When complete, the DKIST will be the largest solar telescope in the world. The Facility Management System (FMS) is a subsystem of the high-level Facility Control System (FCS) and directly controls the Facility Thermal System (FTS). The FMS receives operational mode information from the FCS while making process data available to the FCS and includes hardware and software to integrate and control all aspects of the FTS including the Carousel Cooling System, the Telescope Chamber Environmental Control Systems, and the Temperature Monitoring System. In addition it will integrate the Power Energy Management System and several service systems such as heating, ventilation, and air conditioning (HVAC), the Domestic Water Distribution System, and the Vacuum System. All of these subsystems must operate in coordination to provide the best possible observing conditions and overall building management. Further, the FMS must actively react to varying weather conditions and observational requirements. The physical impact of the facility must not interfere with neighboring installations while operating in a very environmentally and culturally sensitive area. The FMS system will be comprised of five Programmable Automation Controllers (PACs). We present a pre-build overview of the functional plan to integrate all of the FMS subsystems.

  17. Integrating incident investigation into the management system

    International Nuclear Information System (INIS)

    Peterson, E.E.

    1992-01-01

    In the last 10 yr, the size and frequency of incidents affecting the communities and environment surrounding chemical processing facilities has increased. The chemical process industry, which has always concerned itself with the safety of its facilities, has responded by committing to stricter standards of operation and management. A critical element of these management practices is the use of a structured incident investigation program. Many facilities have implemented and disciplined themselves to perform good investigation of incidents. However, most of these facilities maintain incident investigation as part of their safety management programs. This allows the process to be disconnected from the management system that deals with the day-to-day business of the facility. The first step of integration is understanding the objectives and functions of the management system into which the integration is to occur. To begin, a common definition of management is needed. Management, for the purposes of this discussion, is defined as the system of activities used to control, coordinate, and improve the flow of work within a facility or organization. This definition refers to several concepts that need further development in order to understand how incident investigation can be integrated into a management system, including (a) flow of work, (b) control, and (c) improvement. Application can be made to the nuclear industry

  18. Nuclear Plant Integrated Outage Management

    International Nuclear Information System (INIS)

    Gerstberger, C. R.; Coulehan, R. J.; Tench, W. A.

    1992-01-01

    This paper is a discussion of an emerging concept for improving nuclear plant outage performance - integrated outage management. The paper begins with an explanation of what the concept encompasses, including a scope definition of the service and descriptions of the organization structure, various team functions, and vendor/customer relationships. The evolvement of traditional base scope services to the integrated outage concept is addressed and includes discussions on changing customer needs, shared risks, and a partnership approach to outages. Experiences with concept implementation from a single service in 1984 to the current volume of integrated outage management presented in this paper. We at Westinghouse believe that the operators of nuclear power plants will continue to be aggressively challenged in the next decade to improve the operating and financial performance of their units. More and more customers in the U. S. are looking towards integrated outage as the way to meet these challenges of the 1990s, an arrangement that is best implemented through a long-term partnering with a single-source supplier of high quality nuclear and turbine generator outage services. This availability, and other important parameters

  19. Integrated Rural-Urban Water Management for Climate Based ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    There are serious short- and long-term consequences on human health, physical assets, economic ... To work, adaptive climate-proof integrated urban water management must extend throughout the whole catchment, an approach known as integrated water resource management. ... Careers · Contact Us · Site map.

  20. Groundwater/Vadose Zone Integration Project Management Plan

    International Nuclear Information System (INIS)

    Hughes, M. C.

    1999-01-01

    This Project Management Plan (PMP) defines the authorities, roles, and responsibilities of the US Department of Energy (DOE), Richland Operations Office (RL) and those contractor organizations participating in the Hanford Site' s Groundwater/Vadose Zone (GW/VZ) Integration Project. The PMP also describes the planning and control systems, business processes, and other management tools needed to properly and consistently conduct the Integration Project scope of work

  1. Implementing Integrated River Basin Management in China

    Directory of Open Access Journals (Sweden)

    Dorri G. J. te Boekhorst

    2010-06-01

    Full Text Available This paper examines the role of the World Wildlife Fund for Nature China as policy entrepreneur in China. It illustrates the ways in which the World Wildlife Fund for Nature is active in promoting integrated river basin management in the Yangtze River basin and how the efforts at basin level are matched with the advice of the China Council for International Cooperation on Environment and Development task force on integrated river basin management to the national government of China. This article demonstrates that the World Wildlife Fund for Nature uses various strategies of different types to support a transition process towards integrated river basin management. Successful deployment of these strategies for change in environmental policy requires special skills, actions, and attitudes on the part of the policy entrepreneur, especially in China, where the government has a dominant role regarding water management and the position of policy entrepeneurs is delicate.

  2. Role of plant pathology in integrated pest management.

    Science.gov (United States)

    Jacobsen, B J

    1997-01-01

    Integrated Pest Management (IPM) is a paradigm that is widely adopted by all pest control disciplines but whose early definitions and philosophical basis belong to entomologists. Plant pathology research and extension work has historically emphasized integration of several control strategies and fits both historical and modern definitions of IPM. While the term IPM has been used only sparingly in the phytopathology literature, the integrated disease management strategies emphasized are now considered to be at the forefront of ecologically based or biointensive pest management. While IPM is broadly endorsed by crop protection disciplines, farmers, other agriculturalists, and consumers, the potential for Integrated Pest Management has not been fully realized. Most IPM programs reflect a package of tools and decision aids for individual crop insect, weed, nematode, and plant disease management. IPM programs that integrate all types of pests with the agroecosystem, crop growth and loss models still await the formation of interdisciplinary teams focusing on growers needs. Lack of funding for both discipline and interdisciplinary developmental research and implementation is responsible for the paucity of comprehensive IPM programs for the majority of the U.S. crop acreage. This review explores the origins and evolution of the IPM paradigm and reviews efforts to achieve the body of knowledge and implementation structure to achieve IPM's full potential.

  3. Risk and Work Configuration Management as a Function of Integrated Safety Management

    International Nuclear Information System (INIS)

    Lana Buehrer; Michele Kelly; Fran Lemieux; Fred Williams

    2007-01-01

    National Security Technologies, LLC (NSTec), has established a work management program and corresponding electronic Facilities and Operations Management Information System (e-FOM) to implement Integrated Safety Management (ISM). The management of work scopes, the identification of hazards, and the establishment of implementing controls are reviewed and approved through electronic signatures. Through the execution of the program and the implementation of the electronic system, NSTec staff work within controls and utilize feedback and improvement process. The Integrated Work Control Manual further implements the five functions of ISM at the Activity level. By adding the Risk and Work Configuration Management program, NSTec establishes risk acceptance (business and physical) for liabilities within the performance direction and work management processes. Requirements, roles, and responsibilities are specifically identified in the program while e-FOM provides the interface and establishes the flowdown from the Safety Chain to work and facilities management processes to company work-related directives, and finally to Subject Matter Expert concurrence. The Program establishes, within the defined management structure, management levels for risk identification, risk mitigation (controls), and risk acceptance (business and physical) within the Safety Chain of Responsibility. The Program also implements Integrated Safeguards and Security Management within the NSTec Safety Chain of Responsibility. Once all information has been entered into e-FOM, approved, and captured as data, the information becomes searchable and sortable by hazard, location, organization, mitigating controls, etc

  4. Resources from waste : integrated resource management phase 1 study report

    International Nuclear Information System (INIS)

    Corps, C.; Salter, S.; Lucey, P.; O'Riordan, J.

    2008-01-01

    Integrated resource management (IRM) of municipal waste streams and water systems requires a structured analysis of options that consider environmental aspects such as greenhouse gases, carbon taxes and credits. Each option's inputs and outputs are assessed to determine the net highest and best use and value. IRM focuses on resource recovery and extracting maximum value. It considers the overall net impact on the taxpayer and requires the integration of liquid and solid waste streams to maximize values for recovering energy in the form of biofuels, heat, minerals, water and reducing electricity demand. IRM is linked to water management through reuse of treated water for groundwater recharge and to offset potable water use for non-potable purposes such as irrigation, including potential commercial use, which contributes to maintaining or improving the health of watersheds. This report presented a conceptual design for the application of IRM in the province of British Columbia (BC) and analyzed its potential contribution to the provincial climate change agenda. The report discussed traditional waste management, the IRM approach, and resource recovery technology and opportunities. The business case for IRM in BC was also outlined. It was concluded that IRM has the potential to be a viable solution to water, solid and liquid waste management that should be less expensive, result in fewer environmental impacts, and provide greater flexibility than traditional approaches to waste management. 63 refs., 17 tabs., 21 figs., 10 appendices

  5. Application of contemporary integrated manufacture systems to nuclear power plants management

    International Nuclear Information System (INIS)

    Zhou Gang; Wang Lushuai; Tang Yaoyang

    2005-01-01

    In order to improve the safety, economy and reliability of the operation of a nuclear power plant (NPP), a novel integrated management method is proposed based on the 'integration' concept of the computer and contemporary integrated manufacture systems (CIMS). The design of integrated management system for NPP is studied. In the design of this system, information integration method based on the database and product data management (PDM) technology is adopted. In order to design and integrated management system satisfying the needs of NPP management, all activities of NPP are divided into different categories according to its characteristics. There are subsystems under the general management system to conduct the management work of different categories. All subsystems are interrelated in the environment of CIMS, but relatively independent. The application of CIMS to NPP provides a new way for scientific management of NPP, and makes the best of human, material and information resources. (authors)

  6. Integrated Pest Management (IPM)

    Science.gov (United States)

    Repellents Rodenticides Other types of pesticides Disponible en español Integrated Pest Management (IPM) IPM Company: IPM is the Key - Oregon State University Extension Service Last updated May 11, 2018 Related Insecticides Natural and Biological Pesticides Repellents Rodenticides Other types of pesticides Disponible en

  7. Understanding case mix across three paediatric services: could integration of primary and secondary general paediatrics alter walk-in emergency attendances?

    Science.gov (United States)

    Steele, Lloyd; Coote, Nicky; Klaber, Robert; Watson, Mando; Coren, Michael

    2018-05-04

    To understand the case mix of three different paediatric services, reasons for using an acute paediatric service in a region of developing integrated care and where acute attendances could alternatively have been managed. Mixed methods service evaluation, including retrospective review of referrals to general paediatric outpatients (n=534) and a virtual integrated service (email advice line) (n=474), as well as a prospective survey of paediatric ambulatory unit (PAU) attendees (n=95) and review by a paediatric consultant/registrar to decide where these cases could alternatively have been managed. The case mix of outpatient referrals and the email advice line was similar, but the case mix for PAU was more acute.The most common parental reasons for attending PAU were referral by a community health professional (27.2%), not being able to get a general practitioner (GP) appointment when desired (21.7%), wanting to avoid accident and emergency (17.4%) and wanting specialist paediatric input (14.1%). More than half of PAU presentations were deemed most appropriate for community management by a GP or midwife. The proportion of cases suitable for community management varied by the reason for attendance, with it highestl for parents reporting not being able to get a GP appointment (85%), and lowest for those referred by community health professionals (29%). One in two attendances to acute paediatric services could have been managed in the community. Integration of paediatric services could help address parental reasons for attending acute services, as well as facilitating the community management of chronic conditions. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  8. Managed care, vertical integration strategies and hospital performance.

    Science.gov (United States)

    Wang, B B; Wan, T T; Clement, J; Begun, J

    2001-09-01

    The purpose of this study is to examine the association of managed care with hospital vertical integration strategies, as well as to observe the relationships of different types of vertical integration with hospital efficiency and financial performance. The sample consists of 363 California short-term acute care hospitals in 1994. Linear structure equation modeling is used to test six hypotheses derived from the strategic adaptation model. Several organizational and market factors are controlled statistically. Results suggest that managed care is a driving force for hospital vertical integration. In terms of performance, hospitals that are integrated with physician groups and provide outpatient services (backward integration) have better operating margins, returns on assets, and net cash flows (p < 0.01). These hospitals are not, however, likely to show greater productivity. Forward integration with a long-term-care facility, on the other hand, is positively and significantly related to hospital productivity (p < 0.001). Forward integration is negatively related to financial performance (p < 0.05), however, opposite to the direction hypothesized. Health executives should be responsive to the growth of managed care in their local market and should probably consider providing more backward integrated services rather than forward integrated services in order to improve the hospital's financial performance in today's competitive health care market.

  9. Theoretical framework of integrated strategic performance management system

    OpenAIRE

    Mitrović, Zorica; Todorović, Marija; Bjelica, Dragan

    2015-01-01

    The aim of this paper is to present a conceptual model of the integrated strategic performance management system. This model is conceptual framework designed as a result of research that shows significant benefits of integrated application of strategic management and performance management in organizations. The framework consists of five steps: establishing a planning system, establishing of performance measurement system, establishing an accountability system, establishing of the knowledge m...

  10. Integrated modelling of nitrate loads to coastal waters and land rent applied to catchment scale water management

    DEFF Research Database (Denmark)

    Jacosen, T.; Refsgaard, A.; Jacobsen, Brian H.

    Abstract The EU WFD requires an integrated approach to river basin management in order to meet environmental and ecological objectives. This paper presents concepts and full-scale application of an integrated modelling framework. The Ringkoebing Fjord basin is characterized by intensive agricultu...... in comprehensive, integrated modelling tools.......Abstract The EU WFD requires an integrated approach to river basin management in order to meet environmental and ecological objectives. This paper presents concepts and full-scale application of an integrated modelling framework. The Ringkoebing Fjord basin is characterized by intensive...... agricultural production and leakage of nitrate constitute a major pollution problem with respect groundwater aquifers (drinking water), fresh surface water systems (water quality of lakes) and coastal receiving waters (eutrophication). The case study presented illustrates an advanced modelling approach applied...

  11. Integrated modelling of nitrate loads to coastal waters and land rent applied to catchment-scale water management

    DEFF Research Database (Denmark)

    Refsgaard, A.; Jacobsen, T.; Jacobsen, Brian H.

    2007-01-01

    The EU Water Framework Directive (WFD) requires an integrated approach to river basin management in order to meet environmental and ecological objectives. This paper presents concepts and full-scale application of an integrated modelling framework. The Ringkoebing Fjord basin is characterized by ...... the potential and limitations of comprehensive, integrated modelling tools.  ......The EU Water Framework Directive (WFD) requires an integrated approach to river basin management in order to meet environmental and ecological objectives. This paper presents concepts and full-scale application of an integrated modelling framework. The Ringkoebing Fjord basin is characterized...... by intensive agricultural production and leakage of nitrate constitute a major pollution problem with respect groundwater aquifers (drinking water), fresh surface water systems (water quality of lakes) and coastal receiving waters (eutrophication). The case study presented illustrates an advanced modelling...

  12. Knowledge management: the cornerstone of a 21. century safety case

    International Nuclear Information System (INIS)

    Umeki, H.; Osawa, H.; Naito, M.; Nakano, K.; Makino, H.; Mc Kinley, I.G.

    2008-01-01

    The safety case for a radioactive waste repository involves many complex, multi-disciplinary issues; these must be summarised in a comprehensive and concise manner, with links to all supporting information. The safety case can thus be considered an edifice built on structured knowledge. Knowledge is defined here in the very widest sense; including all of the information underpinning a repository project. Knowledge management covers all aspects of the development, integration, quality assurance, communication and maintenance/archiving of such knowledge. When seen from this perspective, the exponential expansion of the knowledge base represents a little-discussed challenge to safety case development. Indeed, knowledge production rates in this area are rapidly reaching, if not already surpassing, the limits of traditional management methods. This problem has been recognised in Japan and thus a project has been initiated to develop a next generation knowledge management system (KMS). This will utilize advanced electronic information management technology to handle the vast quantity of material involved. Autonomic systems will perform many of the information processing functions, helping ensure that required knowledge is accessible to all stakeholders and that gaps can be identified and supporting R and D prioritized. In a departure from conventional structuring by technical discipline, the prototype KMS utilizes a safety case structure. This should facilitate use of the core of neutral scientific and technical knowledge by both the implementer and the regulator. Flexibility is built into the system, to allow it to be restructured to match the user needs or even interfaced directly to a formal requirements management system. (authors)

  13. Design and implementation of integrated solid wastes management pattern in industrial zones, case study of Shahroud, Iran.

    Science.gov (United States)

    Saeid, Nazemi; Roudbari, Aliakbar; Yaghmaeian, Kamyar

    2014-01-14

    The aim of the study was to design and implementation of integrated solid wastes management pattern in Shahroud industrial zone, evaluates the results and determine possible performance problems. This cross - sectional study was carried out for 4 years in Shahroud industrial zone and the implementation process included:1- Qualitative and quantitative analysis of all solid waste generated in the city, 2- determine the current state of solid waste management in the zone and to identify programs conducted, 3- Design and implementation of integrated solid wastes management pattern including design and implementation of training programs, laws, penalties and incentives and explain and implement programs for all factories and 4- The monitoring of the implementation process and determine the results. Annually, 1,728 tons of solid wastes generated in the town including 1603 tons of industrial wastes and 125 tons of municipal wastes. By implementing this pattern, the two separated systems of collection and recycling of domestic and industrial wastes was launched in this zone. Also consistent with the goals, the amount of solid wastes generated and disposed in 2009 was 51.5 and 28.6 kg per 100 million Rials production, respectively. Results showed that implementation of pattern of separated collection, training programs, capacity building, providing technical services, completing chain of industries and strengthening the cooperation between industrial estate management and industrial units could greatly reduce the waste management problems.

  14. A Semantic Web management model for integrative biomedical informatics.

    Directory of Open Access Journals (Sweden)

    Helena F Deus

    2008-08-01

    Full Text Available Data, data everywhere. The diversity and magnitude of the data generated in the Life Sciences defies automated articulation among complementary efforts. The additional need in this field for managing property and access permissions compounds the difficulty very significantly. This is particularly the case when the integration involves multiple domains and disciplines, even more so when it includes clinical and high throughput molecular data.The emergence of Semantic Web technologies brings the promise of meaningful interoperation between data and analysis resources. In this report we identify a core model for biomedical Knowledge Engineering applications and demonstrate how this new technology can be used to weave a management model where multiple intertwined data structures can be hosted and managed by multiple authorities in a distributed management infrastructure. Specifically, the demonstration is performed by linking data sources associated with the Lung Cancer SPORE awarded to The University of Texas MD Anderson Cancer Center at Houston and the Southwestern Medical Center at Dallas. A software prototype, available with open source at www.s3db.org, was developed and its proposed design has been made publicly available as an open source instrument for shared, distributed data management.The Semantic Web technologies have the potential to addresses the need for distributed and evolvable representations that are critical for systems Biology and translational biomedical research. As this technology is incorporated into application development we can expect that both general purpose productivity software and domain specific software installed on our personal computers will become increasingly integrated with the relevant remote resources. In this scenario, the acquisition of a new dataset should automatically trigger the delegation of its analysis.

  15. Managing racial integration in South African public schools: In ...

    African Journals Online (AJOL)

    The paper explores what racial integration is. Furthermore, it scrutinises how racial integration is currently managed in South African Public schools. The main argument of the paper defends a deliberative conception of managing racial integration in South African public schools. In light of this, there is some form of hope to ...

  16. Integrated groundwater data management

    Science.gov (United States)

    Fitch, Peter; Brodaric, Boyan; Stenson, Matt; Booth, Nathaniel; Jakeman, Anthony J.; Barreteau, Olivier; Hunt, Randall J.; Rinaudo, Jean-Daniel; Ross, Andrew

    2016-01-01

    The goal of a data manager is to ensure that data is safely stored, adequately described, discoverable and easily accessible. However, to keep pace with the evolution of groundwater studies in the last decade, the associated data and data management requirements have changed significantly. In particular, there is a growing recognition that management questions cannot be adequately answered by single discipline studies. This has led a push towards the paradigm of integrated modeling, where diverse parts of the hydrological cycle and its human connections are included. This chapter describes groundwater data management practices, and reviews the current state of the art with enterprise groundwater database management systems. It also includes discussion on commonly used data management models, detailing typical data management lifecycles. We discuss the growing use of web services and open standards such as GWML and WaterML2.0 to exchange groundwater information and knowledge, and the need for national data networks. We also discuss cross-jurisdictional interoperability issues, based on our experience sharing groundwater data across the US/Canadian border. Lastly, we present some future trends relating to groundwater data management.

  17. Integrated management system: The integration of ISO 9001, ISO 14001, OHSAS 18001 and ISO 31000

    Science.gov (United States)

    Muzaimi, Hafizzudin; Chew, Boon Cheong; Hamid, Syaiful Rizal

    2017-03-01

    The implementation of integrated management system (IMS) for better quality management has become a preference for many organizations. This can be seen as many organizations used the combination of quality ISO 9001, an environment ISO 14001 and occupational health and safety management system OHSAS 18001 as a core for the IMS that largely implemented. Besides, the linked between quality management with risk management system need to be identified as the management system that enhance the effectiveness of IMS. Therefore, the risk management system ISO 31000 also presented as a part of integration. In nowadays competitive environment, the increasing pressure and needs from customer or stakeholders make it compulsory for the organization to propose the new system and standards. This paper presents and discusses about the benefit of integration, the management system components that can be converged and the implementation approach. A series of interview was conducted through in-depth interviews with 8 experts in this field, while data collected were analyzed qualitatively. The results consist of 16 factors of IMS implementation that have been identified and the use of PDCA approach for an effective implementation of IMS. As a conclusion, the paper proposes the integration of four management systems (ISO 9001, ISO 14001, OHSAS 18001 and ISO 31000) and on how the IMS can be used to structure the process of management for quality management towards sustainability practices in the organization.

  18. Information Systems Integration and Enterprise Application Integration (EAI) Adoption: A Case from Financial Services

    Science.gov (United States)

    Lam, Wing

    2007-01-01

    Increasingly, organizations find that they need to integrate large number of information systems in order to support enterprise-wide business initiatives such as e-business, supply chain management and customer relationship management. To date, organizations have largely tended to address information systems (IS) integration in an ad-hoc manner.…

  19. Integrating Long-Term Avian Studies with Planning and Adaptive Management: Department of Energy Lands as a Case Study.

    Energy Technology Data Exchange (ETDEWEB)

    Burger, J.

    2000-10-01

    Long-term bio-monitoring of avian communities have been initiated, but they often lack a management component. Integration of the managers needs at an early stage is suggested as a means to increase the use of the data. Variation in community structure is important in understanding impacts. In addition, reference site must be carefully selected.

  20. Sustainability Strategy and Management Control Systems in Family Firms. Evidence from a Case Study

    Directory of Open Access Journals (Sweden)

    Fabio Caputo

    2017-06-01

    Full Text Available The aim of this paper is to investigate how the integration of new forms of sustainable control systems (SCSs and traditional management control systems (MCSs, and the use of these control systems affect the integration of sustainability within organizational strategy. A qualitative case study based on a longitudinal investigation of an Italian family firm operating in an environment-sensitive context, the intermodal transport industry, has been used to trace the company’s pathway to sustainability integration based on the Gond et al. framework. The paper enriches the Gond et al. conceptualization providing evidence of the external and internal factors relevant in affecting the organization’s pathway towards sustainability integration. To the best of the authors’ knowledge, the present study is the first analysis that investigates the integration of sustainability into organizational strategy in the context of family firms, from the point of view of performance management systems (PMSs.

  1. Making alliances work -- Using a computer-based management system to integrate the supply chain

    International Nuclear Information System (INIS)

    Johnson, J.B.; Randolph, S.

    1995-01-01

    Traditionally, price has been king in the selection of suppliers and service companies in the upstream oil and gas market. Three years ago, Amoco began to question this selection practice and embarked on an extensive benchmarking effort that has led the company to a proven strategy for goods and services procurement called supply-chain management (SCM). However, the company found that managing compact, integrated supply chains is not always easy. Several implementation issues need to be reconciled for alliances to achieve their full bottom-line potential benefits consistently. Issues that must be resolved, whether they are called alliances, supply chains, or integrated services, are (1) whether these new working relationships are profitable for all the entities involved, from suppliers through to end users; (2) how to assess and improve risk management; (3) how to reduce total system costs; and (4) how to improve performance for each of the alliance members and for the alliance as a whole. This brief describes one possible solution to the complex issues involved in making alliances work: a computer-facilitated management system designed to integrate the work processes of different organizations. In the case described, the Drilling Management System (DMS) was developed and used by the Amoco (U.K.) Well Dept. The system uses off-the-shelf commercial software to improve the performance of the company's drilling operations by integrating the activities of the company and its suppliers

  2. Integrating School-Based and Therapeutic Conflict Management Models at School.

    Science.gov (United States)

    D'Oosterlinck, Franky; Broekaert, Eric

    2003-01-01

    Explores the possibility of integrating school-based and therapeutic conflict management models, comparing two management models: a school-based conflict management program, "Teaching Students To Be Peacemakers"; and a therapeutic conflict management program, "Life Space Crisis Intervention." The paper concludes that integration might be possible…

  3. Connected health and integrated care: Toward new models for chronic disease management.

    Science.gov (United States)

    Chouvarda, Ioanna G; Goulis, Dimitrios G; Lambrinoudaki, Irene; Maglaveras, Nicos

    2015-09-01

    The increasingly aging population in Europe and worldwide brings up the need for the restructuring of healthcare. Technological advancements in electronic health can be a driving force for new health management models, especially in chronic care. In a patient-centered e-health management model, communication and coordination between patient, healthcare professionals in primary care and hospitals can be facilitated, and medical decisions can be made timely and easily communicated. Bringing the right information to the right person at the right time is what connected health aims at, and this may set the basis for the investigation and deployment of the integrated care models. In this framework, an overview of the main technological axes and challenges around connected health technologies in chronic disease management are presented and discussed. A central concept is personal health system for the patient/citizen and three main application areas are identified. The connected health ecosystem is making progress, already shows benefits in (a) new biosensors, (b) data management, (c) data analytics, integration and feedback. Examples are illustrated in each case, while open issues and challenges for further research and development are pinpointed. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  4. Service Integration to Enhance Research Data Management: RSpace Electronic Laboratory Notebook Case Study

    Directory of Open Access Journals (Sweden)

    Stuart Macdonald

    2015-02-01

    Full Text Available Research Data Management (RDM provides a framework that supports researchers and their data throughout the course of their research and is increasingly regarded as one of the essential areas of responsible conduct of research. New tools and infrastructures make possible the generation of large volumes of digital research data in a myriad of formats. This facilitates new ways to analyse, share and reuse these outputs, with libraries, IT services and other service units within academic institutions working together with the research community to develop RDM infrastructures to curate and preserve this type of research output and make them re-usable for future generations. Working on the principle that a rationalised and continuous flow of data between systems and across institutional boundaries is one of the core goals of information management, this paper will highlight service integration via Electronic Laboratory Notebooks (ELN, which streamline research data workflows, result in efficiency gains for researchers, research administrators and other stakeholders, and ultimately enhance the RDM process.

  5. Structural integrity analyses: can we manage the advances?

    International Nuclear Information System (INIS)

    Sauve, R.

    2006-01-01

    the recognition that traditional methods of analysis can still be utilized to provide improved understanding and also as an independent check on the validity of results. Unfortunately, tight schedule and budgetary constraints, lack of proper understanding of the problem, codes and standards based on older methods of analysis and inadequate training in the use of the advances (e.g. finite element method) can lead to difficulties. In the case of engineering software, the temptation to change the problem to suit the computer code due to its limitations must be avoided. For highly complex structures, computer modelling coupled with testing provides a robust method that can avoid costly and sometimes fatal errors in design. In this presentation, a brief overview of the evolution of state-of-the-art in computer modelling pertaining to structural integrity is provided. Managing the process through understanding the problem, knowing software limitations and establishing appropriate quality assurance for advanced analyses is covered. The impact of the advances in structural integrity evaluations on codes and standards such as the ASME boiler and pressure vessel code is briefly discussed. (author)

  6. Integrated surface management for pipeline construction: The Mid-America Pipeline Company Four Corners Project

    Science.gov (United States)

    Maria L. Sonett

    1999-01-01

    Integrated surface management techniques for pipeline construction through arid and semi-arid rangeland ecosystems are presented in a case history of a 412-mile pipeline construction project in New Mexico. Planning, implementation and monitoring for restoration of surface hydrology, soil stabilization, soil cover, and plant species succession are discussed. Planning...

  7. Implementation of an Integrated Information Management System at the National Library of Wales: A Case Study

    Science.gov (United States)

    Evans, Manon Foster; Thomas, Sian

    2007-01-01

    Purpose: This paper aims to describe the experiences of the National Library of Wales in implementing an integrated information management system. Design/methodology/approach: Discusses the stages involved in the procurement process, data migration and general system implementation. Findings: Emphasises the need for a well-prepared yet flexible…

  8. Integrated Simulation Of Supply Chain Management

    Directory of Open Access Journals (Sweden)

    N.Manikandan

    2013-06-01

    Full Text Available Nowadays, manufacturers face the challenge of reducing manufacturing cycle time, delivery lead time and inventory reduction. Every organization has its own objectives and its own way of decision making processes. Because of the conflictions among the objectives of each organization and non-integrated decision making processes, there has been a need for a new mechanism, which help to resolve those conflictions and to integrate processes. In the early 1990s, management is a process of integrating and utilizing suppliers, manufacturers, warehouses and retailers, so that goods are produced and delivered at the right quantities and at the right time while minimizing costs as well as satisfying customer requirements. Managing the entire supply chain becomes a key factor for the successful business. Organizations now realize that non-integrated manufacturing processes, nonintegrated distribution processes and poor relationships with suppliers and customers are in adequate for their success. The supply chain areas are affected by the organization’s plan. The organization plan’s impact on the supply chain areas cannot be predicted before its execution. Simulation paves way to evaluate the performance of plans before the execution of the plan. This paper describes the effort of developing a simulation model for the supply chain management in an industry. This article discusses the requirement of supply chain simulation modeling.

  9. Risk Informed Structural Systems Integrity Management

    DEFF Research Database (Denmark)

    Nielsen, Michael Havbro Faber

    2017-01-01

    The present paper is predominantly a conceptual contribution with an appraisal of major developments in risk informed structural integrity management for offshore installations together with a discussion of their merits and the challenges which still lie ahead. Starting point is taken in a selected...... overview of research and development contributions which have formed the basis for Risk Based Inspection Planning (RBI) as we know it today. Thereafter an outline of the methodical basis for risk informed structural systems integrity management, i.e. the Bayesian decision analysis is provided in summary....... The main focus is here directed on RBI for offshore facilities subject to fatigue damages. New ideas and methodical frameworks in the area of robustness and resilience modeling of structural systems are then introduced, and it is outlined how these may adequately be utilized to enhance Structural Integrity...

  10. Integrated Management System Incorporating Quality Management and Management of Environment, Health and Occupational Safety

    International Nuclear Information System (INIS)

    Manchev, B.; Nenkova, B.; Tomov, E.

    2012-01-01

    Risk Engineering Ltd is a Bulgarian private company founded in 1990 to provide engineering and consulting services applicable to each and every field of the energy sector. Since its establishment Risk Engineering Ltd develops, implement and apply a System for quality assurance, certified for the first time by BVQI (now Bureau Veritas Certification) in 1999 for conformity with the standard ISO 9001:1994. Later on, in connection with the revision of the standards of ISO 9000 series and introduction of the standard ISO 9001:2000 a Quality Management System in conformity with the standard ISO 9001:2000 was developed, introduced and certified. At present, Risk Engineering Ltd has got developed, documented, introduced and certified by Lloyd's Register Quality Assurance (LRQA) Quality Management System in compliance with ISO 9001:2008 on the process approach basis. On this basis and including the requirements of the ISO 14001:2004 (regarding the environment) and OHSAS 18001:2007 (regarding the health and occupational safety), Risk Engineering Ltd has developed and introduced Integrated Management System aim at achieving and demonstrating good results regarding protection of the environment, health and occupational safety. The processes under control by the Integrated Management System and applicable at the company are divided in two general types: A) Management processes: Strategic management and Management of the human resources. B) Processes describing the main activities: design/development process; project management; management of industrial projects and technical infrastructure project; construction, installation, repair and operation of power industry facilities; commercial activities and marketing; investigation of energy efficiency of industrial systems and certification of buildings regarding energy efficiency; consulting activity in the field of industry and energy as well as consultant in accordance with the Law of the Spatial Planning; management of the

  11. Integrated case management for work-related upper-extremity disorders: impact of patient satisfaction on health and work status.

    Science.gov (United States)

    Feuerstein, Michael; Huang, Grant D; Ortiz, Jose M; Shaw, William S; Miller, Virginia I; Wood, Patricia M

    2003-08-01

    An integrated case management (ICM) approach (ergonomic and problem-solving intervention) to work-related upper-extremity disorders was examined in relation to patient satisfaction, future symptom severity, function, and return to work (RTW). Federal workers with work-related upper-extremity disorder workers' compensation claims (n = 205) were randomly assigned to usual care or ICM intervention. Patient satisfaction was assessed after the 4-month intervention period. Questionnaires on clinical outcomes and ergonomic exposure were administered at baseline and at 6- and 12-months postintervention. Time from intervention to RTW was obtained from an administrative database. ICM group assignment was significantly associated with greater patient satisfaction. Regression analyses found higher patient satisfaction levels predicted decreased symptom severity and functional limitations at 6 months and a shorter RTW. At 12 months, predictors of positive outcomes included male gender, lower distress, lower levels of reported ergonomic exposure, and receipt of ICM. Findings highlight the utility of targeting workplace ergonomic and problem solving skills.

  12. Four integration patterns

    DEFF Research Database (Denmark)

    Bygstad, Bendik; Nielsen, Peter Axel; Munkvold, Bjørn Erik

    2010-01-01

    This paper aims to contribute to a theory of integration within the field of IS project management. Integration is a key IS project management issue when new systems are developed and implemented into an increasingly integrated information infrastructure in corporate and governmental organizations....... Expanding the perspective of traditional project management research, we draw extensively on central insights from IS research. Building on socio-technical IS research and Software Engineering research we suggest four generic patterns of integration: Big Bang, Stakeholder Integration, Technical Integration...... and Socio-Technical Integration. We analyze and describe the advantages and disadvantages of each pattern. The four patterns are ideal types. To explore the forces and challenges in these patterns three longitudinal case studies were conducted. In particular we investigate the management challenges for each...

  13. Integrating fire management into land management planning for west-side forests

    Science.gov (United States)

    Peter D. Teensma

    1996-01-01

    Fire management's integration into land management planning is critical to the successful management of nearly all wildland ecosystems, including westside forests, which lie west of the Cascade crest in Oregon and the northern coastal ranges in California. Restoration and maintenance of fire as an ecosystem process is critical to retention of biological diversity...

  14. Interactive modelling with stakeholders in two cases in flood management

    Science.gov (United States)

    Leskens, Johannes; Brugnach, Marcela

    2013-04-01

    New policies on flood management called Multi-Level Safety (MLS), demand for an integral and collaborative approach. The goal of MLS is to minimize flood risks by a coherent package of protection measures, crisis management and flood resilience measures. To achieve this, various stakeholders, such as water boards, municipalities and provinces, have to collaborate in composing these measures. Besides the many advances this integral and collaborative approach gives, the decision-making environment becomes also more complex. Participants have to consider more criteria than they used to do and have to take a wide network of participants into account, all with specific perspectives, cultures and preferences. In response, sophisticated models are developed to support decision-makers in grasping this complexity. These models provide predictions of flood events and offer the opportunity to test the effectiveness of various measures under different criteria. Recent model advances in computation speed and model flexibility allow stakeholders to directly interact with a hydrological hydraulic model during meetings. Besides a better understanding of the decision content, these interactive models are supposed to support the incorporation of stakeholder knowledge in modelling and to support mutual understanding of different perspectives of stakeholders To explore the support of interactive modelling in integral and collaborate policies, such as MLS, we tested a prototype of an interactive flood model (3Di) with respect to a conventional model (Sobek) in two cases. The two cases included the designing of flood protection measures in Amsterdam and a flood event exercise in Delft. These case studies yielded two main results. First, we observed that in the exploration phase of a decision-making process, stakeholders participated actively in interactive modelling sessions. This increased the technical understanding of complex problems and the insight in the effectiveness of various

  15. Integration issues of information engineering based I-CASE tools

    OpenAIRE

    Kurbel, Karl; Schnieder, Thomas

    1994-01-01

    Problems and requirements regarding integration of methods and tools across phases of the software-development life cycle are discussed. Information engineering (IE) methodology and I-CASE (integrated CASE) tools supporting IE claim to have an integrated view across major stages of enterprise-wide information-system development: information strategy planning, business area analysis, system design, and construction. In the main part of this paper, two comprehensive I-CASE tools, ADW (Applicati...

  16. Cost-Effectiveness Evaluation of a Novel Integrated Bite Case Management Program for the Control of Human Rabies, Haiti 2014-2015.

    Science.gov (United States)

    Undurraga, Eduardo A; Meltzer, Martin I; Tran, Cuc H; Atkins, Charisma Y; Etheart, Melissa D; Millien, Max F; Adrien, Paul; Wallace, Ryan M

    2017-06-01

    AbstractHaiti has the highest burden of rabies in the Western hemisphere, with 130 estimated annual deaths. We present the cost-effectiveness evaluation of an integrated bite case management program combining community bite investigations and passive animal rabies surveillance, using a governmental perspective. The Haiti Animal Rabies Surveillance Program (HARSP) was first implemented in three communes of the West Department, Haiti. Our evaluation encompassed all individuals exposed to rabies in the study area ( N = 2,289) in 2014-2015. Costs (2014 U.S. dollars) included diagnostic laboratory development, training of surveillance officers, operational costs, and postexposure prophylaxis (PEP). We used estimated deaths averted and years of life gained (YLG) from prevented rabies as health outcomes. HARSP had higher overall costs (range: $39,568-$80,290) than the no-bite-case-management (NBCM) scenario ($15,988-$26,976), partly from an increased number of bite victims receiving PEP. But HARSP had better health outcomes than NBCM, with estimated 11 additional annual averted deaths in 2014 and nine in 2015, and 654 additional YLG in 2014 and 535 in 2015. Overall, HARSP was more cost-effective (US$ per death averted) than NBCM (2014, HARSP: $2,891-$4,735, NBCM: $5,980-$8,453; 2015, HARSP: $3,534-$7,171, NBCM: $7,298-$12,284). HARSP offers an effective human rabies prevention solution for countries transitioning from reactive to preventive strategies, such as comprehensive dog vaccination.

  17. Integrating Nuclear Energy to Oilfield Operations - Two Case Studies

    International Nuclear Information System (INIS)

    Robertson, Eric P.; Nelson, Lee O.; McKellar, Michael G.; Gandrik, Anastasia M.; Patterson, Mike W.

    2011-01-01

    Fossil fuel resources that require large energy inputs for extraction, such as the Canadian oil sands and the Green River oil shale resource in the western USA, could benefit from the use of nuclear power instead of power generated by natural gas combustion. This paper discusses the technical and economic aspects of integrating nuclear energy with oil sands operations and the development of oil shale resources. A high temperature gas reactor (HTGR) that produces heat in the form of high pressure steam (no electricity production) was selected as the nuclear power source for both fossil fuel resources. Both cases were based on 50,000 bbl/day output. The oil sands case was a steam-assisted, gravity-drainage (SAGD) operation located in the Canadian oil sands belt. The oil shale development was an in-situ oil shale retorting operation located in western Colorado, USA. The technical feasibility of the integrating nuclear power was assessed. The economic feasibility of each case was evaluated using a discounted cash flow, rate of return analysis. Integrating an HTGR to both the SAGD oil sands operation and the oil shale development was found to be technically feasible for both cases. In the oil sands case, integrating an HTGR eliminated natural gas combustion and associated CO2 emissions, although there were still some emissions associated with imported electrical power. In the in situ oil shale case, integrating an HTGR reduced CO2 emissions by 88% and increased natural gas production by 100%. Economic viabilities of both nuclear integrated cases were poorer than the non-nuclear-integrated cases when CO2 emissions were not taxed. However, taxing the CO2 emissions had a significant effect on the economics of the non-nuclear base cases, bringing them in line with the economics of the nuclear-integrated cases. As we move toward limiting CO2 emissions, integrating non-CO2-emitting energy sources to the development of energy-intense fossil fuel resources is becoming

  18. Supplier Integration in Category Management : A case study of the situational impact on relationship performance and interdependence

    OpenAIRE

    Ellström, Daniel

    2015-01-01

    Supplier integration in category management means that a supplier takes part in the activities that are traditionally performed by retailers. These activities are the selection of which products to sell, decisions on how to price and market the products, and making sure that the products are delivered to the stores in a timely manner. Depending on the situation, an integration of suppliers in these activities can be more or less suitable. As more research is needed to understand when supplier...

  19. Integrated pest management and weed management in the United States and Canada.

    Science.gov (United States)

    Owen, Micheal D K; Beckie, Hugh J; Leeson, Julia Y; Norsworthy, Jason K; Steckel, Larry E

    2015-03-01

    There is interest in more diverse weed management tactics because of evolved herbicide resistance in important weeds in many US and Canadian crop systems. While herbicide resistance in weeds is not new, the issue has become critical because of the adoption of simple, convenient and inexpensive crop systems based on genetically engineered glyphosate-tolerant crop cultivars. Importantly, genetic engineering has not been a factor in rice and wheat, two globally important food crops. There are many tactics that help to mitigate herbicide resistance in weeds and should be widely adopted. Evolved herbicide resistance in key weeds has influenced a limited number of growers to include a more diverse suite of tactics to supplement existing herbicidal tactics. Most growers still emphasize herbicides, often to the exclusion of alternative tactics. Application of integrated pest management for weeds is better characterized as integrated weed management, and more typically integrated herbicide management. However, adoption of diverse weed management tactics is limited. Modifying herbicide use will not solve herbicide resistance in weeds, and the relief provided by different herbicide use practices is generally short-lived at best. More diversity of tactics for weed management must be incorporated in crop systems. © 2014 Society of Chemical Industry.

  20. Design of an integrated information management system for safe management of radioactive waste

    International Nuclear Information System (INIS)

    Son, Dong Chan; Hong, Suk Young; An, Kyoung Il

    2003-05-01

    An integrated data management system for the safe management of radioactive waste and spent fuel in Korea is developed to collect basic information, provide the framework for national regulation, and improve national competition and efficiency in the management of radioactive waste and spent fuel. This system can also provide public access to information such as a statistical graphs and integrated data from various waste generators to meet increased public needs and interests. Objectives can be summarized as: the five principles (independence, openness, clearance, efficiency and reliance) of safety regulation can be realized. Public understanding and reliance on the safety of spent fuel and radioactive waste management can be promoted by providing reliable information. Ensure an openness within the international nuclear community and efficiently support international agreements among contracting parties by operating safe and efficient management of spent fuel and radioactive waste (IAEA joint convention on the safety of spent fuel management and on the safety of radioactive waste management). The system can compensate for the imperfections in safe regulation of radioactive waste and spent fuel management related to waste generation, storage and disposal, and make it possible to holistic control. Re-organize the basic framework of KINS's intermediate and long term research organization and trends, regarding waste management policy is to integrate safe management and unit safe disposal

  1. Design of an integrated information management system for safe management of radioactive waste

    Energy Technology Data Exchange (ETDEWEB)

    Son, Dong Chan; Hong, Suk Young; An, Kyoung Il [Daesang Information Technology Co., Ltd., Seoul (Korea, Republic of)] (and others)

    2003-05-15

    An integrated data management system for the safe management of radioactive waste and spent fuel in Korea is developed to collect basic information, provide the framework for national regulation, and improve national competition and efficiency in the management of radioactive waste and spent fuel. This system can also provide public access to information such as a statistical graphs and integrated data from various waste generators to meet increased public needs and interests. Objectives can be summarized as: the five principles (independence, openness, clearance, efficiency and reliance) of safety regulation can be realized. Public understanding and reliance on the safety of spent fuel and radioactive waste management can be promoted by providing reliable information. Ensure an openness within the international nuclear community and efficiently support international agreements among contracting parties by operating safe and efficient management of spent fuel and radioactive waste (IAEA joint convention on the safety of spent fuel management and on the safety of radioactive waste management). The system can compensate for the imperfections in safe regulation of radioactive waste and spent fuel management related to waste generation, storage and disposal, and make it possible to holistic control. Re-organize the basic framework of KINS's intermediate and long term research organization and trends, regarding waste management policy is to integrate safe management and unit safe disposal.

  2. INNOVATION DEVELOPMENT MANAGEMENT IN VERTICALLY INTEGRATED HOLDING COMPANY

    Directory of Open Access Journals (Sweden)

    Natalya T. Uspenskaja

    2015-01-01

    Full Text Available The trend towards production consolidation and integration processes taking place both in the Russian and global economies leads to development of business associations, with a holding company being the most common form inRussiaand around the globe. The evidence in favor of the formation of holding companies is that they can benefit from the scale (bulk purchasing, centralized stuff training; in the global capital and exports markets they can be more effective than smaller businesses and, if non-profitable, a loss-making structure is easier to liquidate than the entire company; holding companies and associations can be an effective defender from political interference. As the importance of the well-functioning and harmonized procedure for the companies’ integration will increase (especially in the context of Russian business, where specific features of many areas of the production system imply the use of holding oligopolies as the most effective form of market structures, there is a need in their more profound study and, in particular, in the analysis of the most important technologies of the general integration procedure. The article outlines the relevance of innovative development management of vertically integrated holding systems, lists principles of innovative activity management and considers the features of innovation management of a vertically integrated holding company. The objective of the research is to study theoretical and practical aspects of innovative development management in vertically integrated holding systems. The object of research is management structures in innovative holding companies. While working on the article, the following methods of economic research were used: abstract and logical method, empirical method, method of expert evaluations, as well as methods of structural and functional and statistical analysis. 

  3. Integrating ecological knowledge, public perception and urgency of action into invasive species management.

    Science.gov (United States)

    Caplat, Paul; Coutts, Shaun R

    2011-11-01

    Recently Prévot-Julliard and colleagues presented a concept paper on biological conservation strategies using exotic species as a case study. They emphasized the difficulty of integrating conservation into a broad picture that accounts for public perception as well as scientific knowledge. We support this general call for better integration of society in conservation research, but we believe that the original framework might misguide conservation practices if wrongly interpreted. Our objective is to complement their paper and correct a few misleading points, by showing that (1) for regions of high endemicity "reservation" may be the best conservation practice, and does not prevent public participation, (2) aiming for broad societal agreement is valuable, but in some cases risky, and always complex, and (3) calling a harmful invasive species harmful shouldn't be an issue. The Australian context provides us with many cases of the labeling of exotic species as harmful or not, using inputs from scientists, industry, and the public. Integration of social and scientific points of view can only improve conservation on the ground if it allows managers to use the ecological, economic and social impacts of exotic species to prioritize conservation actions in an operative way.

  4. Improve data integration performance by employing metadata management utility

    Energy Technology Data Exchange (ETDEWEB)

    Wei, M.; Sung, A.H. [New Mexico Petroleum Recovery Research Center, Socorro, NM (United States)

    2005-07-01

    This conference paper explored ways of integrating petroleum and exploration data obtained from different sources in order to provide more comprehensive data for various analysis purposes and to improve the integrity and consistency of integrated data. This paper proposes a methodology to enhance oil and gas industry data integration performance by cooperating data management utilities in Microsoft SQL Server database management system (DBMS) for small scale data integration without support of commercial software. By semi-automatically capturing metadata, data sources are investigated in detail, data quality problems are partially cleansed, and the performance of data integration is improved. 20 refs., 7 tabs., 1 fig.

  5. Enhanced Case Management versus Substance Abuse Treatment Alone among Substance Abusers with Depression

    Science.gov (United States)

    Striley, Catherine W.; Nattala, Prasanthi; Ben Abdallah, Arbi; Dennis, Michael L.; Cottler, Linda B.

    2013-01-01

    This pilot study evaluated the effectiveness of enhanced case management for substance abusers with comorbid major depression, which was an integrated approach to care. One hundred and 20 participants admitted to drug treatment who also met Computerized Diagnostic Interview Schedule criteria for major depression at baseline were randomized to…

  6. [Case managers experience improved trajectories for cancer patients after implementation of the case manager function].

    Science.gov (United States)

    Axelsen, Karina Rahbek; Nafei, Hanne; Jakobsen, Stine Finne; Gandrup, Per; Knudsen, Janne Lehmann

    2015-06-08

    Case managers are increasingly used to optimize trajectories for patients. This study is based on a questionnaire among case managers in cancer care, aiming at the clarification of the func­tion and its impact on especially patient safety, when handing over the responsibility. The results show a major variation in how the function is organized, the level of competence and the task to be handled. The responsibility has in general been nar­rowed to department level. Overall, the case managers believe that the function has optimized pathways for cancer patients and improved safety, but barriers persist.

  7. Integrated software system for low level waste management

    International Nuclear Information System (INIS)

    Worku, G.

    1995-01-01

    In the continually changing and uncertain world of low level waste management, many generators in the US are faced with the prospect of having to store their waste on site for the indefinite future. This consequently increases the set of tasks performed by the generators in the areas of packaging, characterizing, classifying, screening (if a set of acceptance criteria applies), and managing the inventory for the duration of onsite storage. When disposal sites become available, it is expected that the work will require re-evaluating the waste packages, including possible re-processing, re-packaging, or re-classifying in preparation for shipment for disposal under the regulatory requirements of the time. In this day and age, when there is wide use of computers and computer literacy is at high levels, an important waste management tool would be an integrated software system that aids waste management personnel in conducting these tasks quickly and accurately. It has become evident that such an integrated radwaste management software system offers great benefits to radwaste generators both in the US and other countries. This paper discusses one such approach to integrated radwaste management utilizing some globally accepted radiological assessment software applications

  8. Population-based worksite obesity management interventions: a qualitative case study.

    Science.gov (United States)

    Romney, Martha C; Thomson, Erin; Kash, Kathryn

    2011-06-01

    Due to the increased prevalence of obesity and associated direct and indirect costs to employers, weight management programs have become an integral component of employer and insurer benefits plans. The programs vary in foci, scope, breadth, and implementation. The aim of this study was to explore promising employer-sponsored population-based obesity management programs. A case study that utilized a telephonic semi-structured questionnaire was conducted with small and large organizations located in different regions of the United States that had been recruited to participate. Eight employers and 1 health care advocacy coalition who met the inclusion criteria were interviewed about features of their weight management programs. The case study revealed a number of themes consistent with reports in the literature and reflecting cited best practices. Key findings include confirmation that weight management is a significant component of the wellness strategy in all participating organizations because employers are invested in population health programs and cost savings. Based upon their experience and knowledge, occupational health specialists are responsible for designing, implementing, managing, and evaluating employee health programs. Almost all employers utilize electronic media as a prominent component of wellness and disease management initiatives. Experience has shown that incentives-both financial and nonmonetary-are effective motivators for employee engagement and outcomes. However, while employers report success, favorable outcomes have been difficult to quantify.

  9. Integrating Expert Knowledge into Mapping Ecosystem Services Trade-offs for Sustainable Forest Management

    Directory of Open Access Journals (Sweden)

    Adrienne Grêt-Regamey

    2013-09-01

    Full Text Available Mountain ecosystems are highly sensitive to global change. In fact, the continued capacity of mountain regions to provide goods and services to society is threatened by the impact of environmental changes on ecosystems. Although mapping ecosystem services values is known to support sustainable resource management, the integration of spatially explicit local expert knowledge on ecosystem dynamics and social responses to global changes has not yet been integrated in the modeling process. This contribution demonstrates the importance of integrating local knowledge into the spatially explicit valuation of ecosystem services. Knowledge acquired by expert surveys flows into a GIS-based Bayesian Network for valuing forest ecosystem services under a land-use and a climate change scenario in a case study in the Swiss Alps. Results show that including expert knowledge in ecosystem services mapping not only reduces uncertainties considerably, but also has an important effect on the ecosystem services values. Particularly the iterative process between integrating expert knowledge into the modeling process and mapping ecosystem services guarantees a continuous improvement of ecosystem services values maps while opening a new way for mutual learning between scientists and stakeholders which might support adaptive resource management.

  10. The GENiC architecture for integrated data centre energy management

    NARCIS (Netherlands)

    Pesch, D.; McGibney, A.; Sobonski, P.; Rea, S.; Scherer, Th.; Chen, L.; Engbersen, T.; Mehta, D.; O'Sullivan, B.; Pages, E.; Townley, J.; Kasinathan, Dh.; Torrens, J.I.; Zavrel, V.; Hensen, J.L.M.

    2015-01-01

    We present an architecture for integrated data centre energy management developed in the EC funded GENiC project. The architecture was devised to create a platform that can integrate functions for workload management, cooling, power management and control of heat recovery for future, highly

  11. Integrating Science-Based Co-management, Partnerships, Participatory Processes and Stewardship Incentives to Improve the Performance of Small-Scale Fisheries

    Directory of Open Access Journals (Sweden)

    Kendra A. Karr

    2017-10-01

    Full Text Available Small scale fisheries are critically important for the provision of food security, livelihoods, and economic development for billions of people. Yet, most of these fisheries appear to not be achieving either fisheries or conservation goals, with respect to creating healthier oceans that support more fish, feed more people and improve livelihoods. Research and practical experience have elucidated many insights into how to improve the performance of small-scale fisheries. Here, we present lessons learned from five case studies of small-scale fisheries in Cuba, Mexico, the Philippines, and Belize. The major lessons that arise from these cases are: (1 participatory processes empower fishers, increase compliance, and support integration of local and scientific knowledge; (2 partnership across sectors improves communication and community buy-in; (3 scientific analysis can lead fishery reform and be directly applicable to co-management structures. These case studies suggest that a fully integrated approach that implements a participatory process to generate a scientific basis for fishery management (e.g., data collection, analysis, design and to design management measures among stakeholders will increase the probability that small-scale fisheries will implement science-based management and improve their performance.

  12. IM (Integrity Management) software must show flexibility to local codes

    Energy Technology Data Exchange (ETDEWEB)

    Brors, Markus [ROSEN Technology and Research Center GmbH (Germany); Diggory, Ian [Macaw Engineering Ltd., Northumberland (United Kingdom)

    2009-07-01

    There are many internationally recognized codes and standards, such as API 1160 and ASME B31.8S, which help pipeline operators to manage and maintain the integrity of their pipeline networks. However, operators in many countries still use local codes that often reflect the history of pipeline developments in their region and are based on direct experience and research on their pipelines. As pipeline companies come under increasing regulatory and financial pressures to maintain the integrity of their networks, it is important that operators using regional codes are able to benchmark their integrity management schemes against these international standards. Any comprehensive Pipeline Integrity Management System (PIMS) software package should therefore not only incorporate industry standards for pipeline integrity assessment but also be capable of implementing regional codes for comparison purposes. This paper describes the challenges and benefits of incorporating one such set of regional pipeline standards into ROSEN Asset Integrity Management Software (ROAIMS). (author)

  13. PROJECT MANAGEMENT OFFICE – LINK BETWEEN ORGANIZATIONAL STRATEGIC AND OPERATIONAL: A CASE STUDY

    Directory of Open Access Journals (Sweden)

    Mario Manzini Cianfanelli

    2014-12-01

    Full Text Available The objective of this work is to demonstrate the organizational integration achieved through the implementation of a project management office (PMO, created to combat the loss of water distribution in one of the business units of Basic Sanitation Company of the State of São Paulo – Sabesp. The methodology used to achieve this goal was the study of a single case in which the information was obtained through documentary research and semi-structured interviews. The results showed how this integration was achieved with the adoption of a standard methodology in project management, control based on information technology and the spread of the organization's strategy in the sectors below. This work concluded that with this implantation of the project management office it was possible to improve the planning and the control of the activities of the projects through a pattern methodology in managing projects that gave possibilities to create a new culture focusing in solving problems.

  14. Integrating the radioactive waste management system into other management systems

    International Nuclear Information System (INIS)

    Silva, Ana Cristina Lourenco da; Nunes Neto, Carlos Antonio

    2007-01-01

    Radioactive waste management is to be included in the Integrated Management System (IMS) which pursues the continuous improvement of the company's quality, occupational safety and health, and environment protection processes. Radioactive waste management is based on the following aspects: optimization of human and material resources for execution of tasks, including the provision of a radiation protection supervisor to watch over the management of radioactive waste; improved documentation (management plan and procedures); optimization of operational levels for waste classification and release; maintenance of generation records and history through a database that facilitates traceability of information; implementation of radioactive waste segregation at source (source identification, monitoring and decontamination) activities intended to reduce the amount of radioactive waste; licensing of initial storage site for radioactive waste control and storage; employee awareness training on radioactive waste generation; identification and evaluation of emergency situations and response planning; implementation of preventive maintenance program for safety related items; development and application of new, advanced treatment methodologies or systems. These aspects are inherent in the concepts underlying quality management (establishment of administrative controls and performance indicators), environment protection (establishment of operational levels and controls for release), occupational health and safety (establishment of operational controls for exposure in emergency and routine situations and compliance with strict legal requirements and standards). It is noted that optimizing the addressed aspects of a radioactive waste management system further enhances the efficiency of the Integrated Management System for Quality, Environment, and Occupational Safety and Health. (author)

  15. A New Approach to Integrate Internet-of-Things and Software-as-a-Service Model for Logistic Systems: A Case Study

    Directory of Open Access Journals (Sweden)

    Shang-Liang Chen

    2014-03-01

    Full Text Available Cloud computing is changing the ways software is developed and managed in enterprises, which is changing the way of doing business in that dynamically scalable and virtualized resources are regarded as services over the Internet. Traditional manufacturing systems such as supply chain management (SCM, customer relationship management (CRM, and enterprise resource planning (ERP are often developed case by case. However, effective collaboration between different systems, platforms, programming languages, and interfaces has been suggested by researchers. In cloud-computing-based systems, distributed resources are encapsulated into cloud services and centrally managed, which allows high automation, flexibility, fast provision, and ease of integration at low cost. The integration between physical resources and cloud services can be improved by combining Internet of things (IoT technology and Software-as-a-Service (SaaS technology. This study proposes a new approach for developing cloud-based manufacturing systems based on a four-layer SaaS model. There are three main contributions of this paper: (1 enterprises can develop their own cloud-based logistic management information systems based on the approach proposed in this paper; (2 a case study based on literature reviews with experimental results is proposed to verify that the system performance is remarkable; (3 challenges encountered and feedback collected from T Company in the case study are discussed in this paper for the purpose of enterprise deployment.

  16. A New Approach to Integrate Internet-of-Things and Software-as-a-Service Model for Logistic Systems: A Case Study

    Science.gov (United States)

    Chen, Shang-Liang; Chen, Yun-Yao; Hsu, Chiang

    2014-01-01

    Cloud computing is changing the ways software is developed and managed in enterprises, which is changing the way of doing business in that dynamically scalable and virtualized resources are regarded as services over the Internet. Traditional manufacturing systems such as supply chain management (SCM), customer relationship management (CRM), and enterprise resource planning (ERP) are often developed case by case. However, effective collaboration between different systems, platforms, programming languages, and interfaces has been suggested by researchers. In cloud-computing-based systems, distributed resources are encapsulated into cloud services and centrally managed, which allows high automation, flexibility, fast provision, and ease of integration at low cost. The integration between physical resources and cloud services can be improved by combining Internet of things (IoT) technology and Software-as-a-Service (SaaS) technology. This study proposes a new approach for developing cloud-based manufacturing systems based on a four-layer SaaS model. There are three main contributions of this paper: (1) enterprises can develop their own cloud-based logistic management information systems based on the approach proposed in this paper; (2) a case study based on literature reviews with experimental results is proposed to verify that the system performance is remarkable; (3) challenges encountered and feedback collected from T Company in the case study are discussed in this paper for the purpose of enterprise deployment. PMID:24686728

  17. A new approach to integrate Internet-of-things and software-as-a-service model for logistic systems: a case study.

    Science.gov (United States)

    Chen, Shang-Liang; Chen, Yun-Yao; Hsu, Chiang

    2014-03-28

    Cloud computing is changing the ways software is developed and managed in enterprises, which is changing the way of doing business in that dynamically scalable and virtualized resources are regarded as services over the Internet. Traditional manufacturing systems such as supply chain management (SCM), customer relationship management (CRM), and enterprise resource planning (ERP) are often developed case by case. However, effective collaboration between different systems, platforms, programming languages, and interfaces has been suggested by researchers. In cloud-computing-based systems, distributed resources are encapsulated into cloud services and centrally managed, which allows high automation, flexibility, fast provision, and ease of integration at low cost. The integration between physical resources and cloud services can be improved by combining Internet of things (IoT) technology and Software-as-a-Service (SaaS) technology. This study proposes a new approach for developing cloud-based manufacturing systems based on a four-layer SaaS model. There are three main contributions of this paper: (1) enterprises can develop their own cloud-based logistic management information systems based on the approach proposed in this paper; (2) a case study based on literature reviews with experimental results is proposed to verify that the system performance is remarkable; (3) challenges encountered and feedback collected from T Company in the case study are discussed in this paper for the purpose of enterprise deployment.

  18. An Integrated Knowledge Management System

    Directory of Open Access Journals (Sweden)

    Vasile Mazilescu

    2014-11-01

    Full Text Available The aim of this paper is to present a Knowledge Management System based on Fuzzy Logic (FLKMS, a real-time expert system to meet the challenges of the dynamic environment. The main feature of our integrated shell FLKMS is that it models and integrates the temporal relationships between the dynamic of the evolution of an economic process with some fuzzy inferential methods, using a knowledge model for control, embedded within the expert system’s operational knowledge base.

  19. Integrated modeling of water supply and demand under management options and climate change scenarios in Chifeng City, China

    Science.gov (United States)

    Lu Hao; Ge Sun; Yongqiang Liu; Hong Qian

    2015-01-01

    Water resource management is becoming increasingly challenging in northern China because of the rapid increase in water demand and decline in water supply due to climate change. We provide a case study demonstrating the importance of integrated watershed management in sustaining water resources in Chifeng City, northern China. We examine the consequences of various...

  20. An assessment of patient education and self-management in diabetes disease management--two case studies.

    Science.gov (United States)

    Fitzner, Karen; Greenwood, Deborah; Payne, Hildegarde; Thomson, John; Vukovljak, Lana; McCulloch, Amber; Specker, James E

    2008-12-01

    Diabetes affects 7.8% of Americans, nearly 24 million people, and costs $174 billion yearly. People with diabetes benefit from self-management; disease management (DM) programs are effective in managing populations with diabetes. Little has been published on the intersection of diabetes education and DM. Our hypothesis was that diabetes educators and their interventions integrate well with DM and effectively support providers' care delivery. A literature review was conducted for papers published within the past 3 years and identified using the search terms "diabetes educator" and "disease management." Those that primarily addressed community health workers or the primary care/community setting were excluded. Two case studies were conducted to augment the literature. Ten of 30 manuscripts identified in the literature review were applicable and indicate that techniques and interventions based on cognitive theories and behavioral change can be effective when coupled with diabetes DM. Better diabetes self-management through diabetes education encourages participation in DM programs and adherence to recommended care in programs offered by DM organizations or those that are provider based. Improved health outcomes and reduced cost can be achieved by blending diabetes education and DM. Diabetes educators are a critical part of the management team and, with their arsenal of goal setting and behavior change techniques, are an essential component for the success of diabetes DM programs. Additional research needs to be undertaken to identify effective ways to integrate diabetes educators and education into DM and to assess clinical, behavioral, and economic outcomes arising from such programs.

  1. Integrated Approach to User Account Management

    Science.gov (United States)

    Kesselman, Glenn; Smith, William

    2007-01-01

    IT environments consist of both Windows and other platforms. Providing user account management for this model has become increasingly diffi cult. If Microsoft#s Active Directory could be enhanced to extend a W indows identity for authentication services for Unix, Linux, Java and Macintosh systems, then an integrated approach to user account manag ement could be realized.

  2. The tortoise shell Integrated Coastal Management in Galapagos

    OpenAIRE

    Polit Arguello, Victor Manuel

    2013-01-01

    The current work aims to examine the legal framework for Integrated Coastal Management for Archipelago de Galapagos. It examines the content of ICM at the internal level in order to find if there is a standard for appropriate Integrated Management of Coastal Zones. Also it aims to define whether the ratification of UNCLOS by the government of Ecuador should affect the implementation of such framework.

  3. Integrated Solution Support System for Water Management

    NARCIS (Netherlands)

    Kassahun, A.; Blind, M.; Krause, A.U.M.; Roosenschoon, O.R.

    2008-01-01

    Solving water management problems involves technical, social, economic, political and legal challenges and thus requires an integrated approach involving people from different backgrounds and roles. The integrated approach has been given a prominent role within the European Union¿s Water Framework

  4. Integrated project-management information systems: the French nuclear industry experience

    Energy Technology Data Exchange (ETDEWEB)

    Jacquin, J.C.; Capuin, G.M.

    1988-01-01

    In the early eighties, and in the French case from 1985, the development of the data-processing industry has made the real integration of project-management information systems feasible, and the data-base administration function has been extended to all facets of the engineering process. The new systems had to take into account the existing ones which were still operating efficiently and the new problems encountered due to the changes in the environment. One of these new problems was equipment and materials management, as the period of plants built in series had vanished, and the industry was obliged to build plants individually. The challenge encountered by the French nuclear industry in terms of the project-management information systems was to adapt efficiently to the new situation, and the purpose of this paper is to describe the most-significant elements of this adaptation. The authors review: (2) the objectives established by the company's general management; (2) the organization put into place to reach these objectives; (3) the main choices made; and (4) the economics. 3 references, 1 figure, 1 table.

  5. Integrated project-management information systems: the French nuclear industry experience

    International Nuclear Information System (INIS)

    Jacquin, J.C.; Capuin, G.M.

    1988-01-01

    In the early eighties, and in the French case from 1985, the development of the data-processing industry has made the real integration of project-management information systems feasible, and the data-base administration function has been extended to all facets of the engineering process. The new systems had to take into account the existing ones which were still operating efficiently and the new problems encountered due to the changes in the environment. One of these new problems was equipment and materials management, as the period of plants built in series had vanished, and the industry was obliged to build plants individually. The challenge encountered by the French nuclear industry in terms of the project-management information systems was to adapt efficiently to the new situation, and the purpose of this paper is to describe the most-significant elements of this adaptation. The authors review: (2) the objectives established by the company's general management; (2) the organization put into place to reach these objectives; (3) the main choices made; and (4) the economics. 3 references, 1 figure, 1 table

  6. Toward population management in an integrated care model.

    Science.gov (United States)

    Maddux, Franklin W; McMurray, Stephen; Nissenson, Allen R

    2013-01-01

    Under the Patient Protection and Affordable Care Act of 2010, accountable care organizations (ACOs) will be the primary mechanism for achieving the dual goals of high-quality patient care at managed per capita costs. To achieve these goals in the newly emerging health care environment, the nephrology community must plan for and direct integrated delivery and coordination of renal care, focusing on population management. Even though the ESRD patient population is a complex group with comorbid conditions that may confound integration of care, the nephrology community has unique experience providing integrated care through ACO-like programs. Specifically, the recent ESRD Management Demonstration Project sponsored by the Centers for Medicare & Medicaid Services and the current ESRD Prospective Payment System with it Quality Incentive Program have demonstrated that integrated delivery of renal care can be accomplished in a manner that provides improved clinical outcomes with some financial margin of savings. Moving forward, integrated renal care will probably be linked to provider performance and quality outcomes measures, and clinical integration initiatives will share several common elements, namely performance-based payment models, coordination of communication via health care information technology, and development of best practices for care coordination and resource utilization. Integration initiatives must be designed to be measured and evaluated, and, consistent with principles of continuous quality improvement, each initiative will provide for iterative improvements of the initiative. © 2013 S. Karger AG, Basel.

  7. Leadership development and succession planning in case management.

    Science.gov (United States)

    Miodonski, Kathleen; Hines, Patricia

    2013-01-01

    The director of case management is one of health care's leadership positions most frequently in demand. The lack of qualified and effective case management leaders will continue to be an issue for organizations for years to come, influenced by increasing pressures on health care reimbursement and the aging case management workforce. Organizations have an opportunity to create a program to develop future case management leaders from their internal talent. The proposed strategies are designed for the acute care hospital but also have applicability in other health care settings where there are case managers and a need for case management leadership. The business community offers leadership research and leadership development models with relevance to case management. Identifying and developing internal talent for leadership roles has been proven to be effective in preparation for advanced responsibilities, has a positive effect on staff morale, and minimizes the impact of vacant leadership positions during recruitment and onboarding activities. Creating a case management leadership development program for an organization can be an alternative to the process of external recruitment for case management department leaders. Such a program can be undertaken even in today's budget conscious environment by accessing existing resources in an organization in a creative and organized manner. The authors outline an approach for case management leaders to accept responsibility for succession planning and for case managers to accept responsibility for promoting their own career development through creation of a leadership development program.

  8. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  9. Intellectual capital management as the integral part of enterprise’s management

    OpenAIRE

    Аліна Олександрівна Осаул

    2016-01-01

    The main levels of the enterprise’s intellectual capital management are analyzed in the article. The distinctive peculiarities of the enterprise’s intellectual capital management are mentioned. Goals and benefits of the intellectual management system are determined. The ways of their improvement are pointed out. Implicit and explicit knowledge as an important integral intellectual capital resources are divided and characterized

  10. Integrated orofacial therapy in chronic rhinosinusitis management for children with sleep bruxism

    Directory of Open Access Journals (Sweden)

    Haryono Utomo

    2010-06-01

    Full Text Available Background: The prevalence of rhinosinusitis was 20% in ambulatory patients and was mostly affected by viral infections and allergy. If conservative treatments of rhinosinusitis failed, surgical procedure is an alternative choice. Previous case report revealed that the rhinosinusitis symptoms were successfully relieved by the "assisted drainage" therapy only. Nevertheless, this therapy was less successful in children with sleep bruxism (SB. Purpose: To report an integrated orofacial therapy for management of rhinosinusitis children with sleep bruxism (SB which consisted of the assisted drainage, night-guard and masseter muscle massage therapies. Case: Two boys who suffered from rhinosinusitis with bruxism were unsuccessfully treated with conventional treatment. Case management: Patients was subjected to the assisted drainage therapy that was scaling and root planning combined with gingival massage, and masseter muscle massage; night guard was worn in night sleep. They successfully relieved the rhinosinusitis symptoms. Conclusion: Based on the successful result, this integrated therapy could be suggested as an adjuvant in rhinosinusitis management.Latar belakang: Prevalensi rinosinusitis adalah 20% pasien rawat jalan dan umumnya disebabkan oleh infeksi virus dan alergi. Apabila terapi konservatif rinosinusitis mengalami kegagalan maka pilihan terakhir adalah operasi. Pada laporan kasus yang ada telah terjadi perbaikan gejala rinosinusitis setelah dilakukan terapi “assisted drainage” saja. Akan tetapi, terapi ini kurang berhasil pada anak dengan sleep bruxism (SB. Tujuan: Melaporkan suatu terapi orofasial terintegrasi untuk tatalaksana rinosinusitis pada anak dengan sleep bruxism (SB yang terdiri dari terapi assisted drainage, night guard dan masase otot masseter. Kasus: Dua anak laki-laki yang menderita rinosinusitis dengan bruxism telah mengalami kegagalan pada perawatan konsvensional. Tatalaksana kasus: Pasien dilakukan terapi assisted

  11. Managing Key Risks in Post-Merger IS Integration

    DEFF Research Database (Denmark)

    Alaranta, Mar; Mathiassen, L

    2014-01-01

    Mergers and acquisitions (M&A) require organizations to blend together different information system (IS) configurations. Unfortunately, less than 50 percent of M&A's achieve their goals, with IS integration being a major problem. Here, the authors offer a framework to help managers prepare for......, analyze, and mitigate risks during post-merger IS integration. They identify key risks relating to IS integration content, process, and context, and present five strategies for mitigating those risks. Their framework aims to help managers proactively reduce the impact of adverse events. Adopting...... the framework supported by their templates is straightforward and the time and resources required are minimal. When properly executed, adoption increases the likelihood of successful merger outcomes; the framework is thus a valuable addition to the management tool box and can be applied in collaboration...

  12. THE MANAGEMENT ACCOUNTING TOOLS AND THE INTEGRATED REPORTING

    Directory of Open Access Journals (Sweden)

    Gabriel JINGA

    2015-04-01

    Full Text Available During the recent years the stakeholders are asking for other pieces of information to be published along with the financial one, such as risk reporting, intangibles, social and environmental accounting. The type of corporate reporting which incorporates the elements enumerated above is the integrated reporting. In this article, we argue that the information disclosed in the integrated reports is prepared by the management accounting, not only by the financial accounting. Thus, we search for the management accounting tools which are used by the companies which prepare integrated reports. In order to do this, we analytically reviewed all the reports available on the website of a selected company. Our results show that the company is using most of the management accounting tools mentioned in the literature review part.

  13. CORPORATIVE MOTIVES ON IMPLEMENTATION OF INTEGRATED MANAGEMENT SYSTEM (IMS

    Directory of Open Access Journals (Sweden)

    Dragan Rajkovic

    2009-09-01

    Full Text Available Integration of management systems for quality, environment, health and risk management as well as corporative social responsibilities is workable corporative approach to reduce costs, effective use of resources, higher motivation of employees and better fulfillment of requirements of social engagements and stakeholders. This paper presents contents of literature and review of a company motives on integrated management system (IMS implementation, namely factors affecting the IMS implementation.

  14. Integration of operational research and environmental management

    NARCIS (Netherlands)

    Bloemhof - Ruwaard, J.M.

    1996-01-01


    The subject of this thesis is the integration of Operational Research and Environmental Management. Both sciences play an important role in the research of environmental issues. Part I describes a framework for the interactions between Operational Research and Environmental Management.

  15. Integrated Financial Management Program

    Science.gov (United States)

    Pho, Susan

    2004-01-01

    Having worked in the Employees and Commercial Payments Branch of the Financial Management Division for the past 3 summers, I have seen the many changes that have occurred within the NASA organization. As I return each summer, I find that new programs and systems have been adapted to better serve the needs of the Center and of the Agency. The NASA Agency has transformed itself the past couple years with the implementation of the Integrated Financial Management Program (IFMP). IFMP is designed to allow the Agency to improve its management of its Financial, Physical, and Human Resources through the use of multiple enterprise module applications. With my mentor, Joseph Kan, being the branch chief of the Employees and Commercial Payments Branch, I have been exposed to several modules, such as Travel Manager, WebTads, and Core Financial/SAP, which were implemented in the last couple of years under the IFMP. The implementation of these agency-wide systems has sometimes proven to be troublesome. Prior to IFMP, each NASA Center utilizes their own systems for Payroll, Travel, Accounts Payable, etc. But with the implementation of the Integrated Financial Management Program, all the "legacy" systems had to be eliminated. As a result, a great deal of enhancement and preparation work is necessary to ease the transformation from the old systems to the new. All this work occurs simultaneously; for example, e-Payroll will "go live" in several months, but a system like Travel Manager will need to have information upgraded within the system to meet the requirements set by Headquarters. My assignments this summer have given me the opportunity to become involved with such work. So far, I have been given the opportunity to participate in projects resulting from a congressional request, several bankcard reconciliations, updating routing lists for Travel Manager, updating the majordomo list for Travel Manager approvers and point of contacts, and a NASA Headquarters project involving

  16. Integrating adaptive management and ecosystem services concepts to improve natural resource management: Challenges and opportunities

    Science.gov (United States)

    Epanchin-Niell, Rebecca S.; Boyd, James W.; Macauley, Molly K.; Scarlett, Lynn; Shapiro, Carl D.; Williams, Byron K.

    2018-05-07

    Executive Summary—OverviewNatural resource managers must make decisions that affect broad-scale ecosystem processes involving large spatial areas, complex biophysical interactions, numerous competing stakeholder interests, and highly uncertain outcomes. Natural and social science information and analyses are widely recognized as important for informing effective management. Chief among the systematic approaches for improving the integration of science into natural resource management are two emergent science concepts, adaptive management and ecosystem services. Adaptive management (also referred to as “adaptive decision making”) is a deliberate process of learning by doing that focuses on reducing uncertainties about management outcomes and system responses to improve management over time. Ecosystem services is a conceptual framework that refers to the attributes and outputs of ecosystems (and their components and functions) that have value for humans.This report explores how ecosystem services can be moved from concept into practice through connection to a decision framework—adaptive management—that accounts for inherent uncertainties. Simultaneously, the report examines the value of incorporating ecosystem services framing and concepts into adaptive management efforts.Adaptive management and ecosystem services analyses have not typically been used jointly in decision making. However, as frameworks, they have a natural—but to date underexplored—affinity. Both are policy and decision oriented in that they attempt to represent the consequences of resource management choices on outcomes of interest to stakeholders. Both adaptive management and ecosystem services analysis take an empirical approach to the analysis of ecological systems. This systems orientation is a byproduct of the fact that natural resource actions affect ecosystems—and corresponding societal outcomes—often across large geographic scales. Moreover, because both frameworks focus on

  17. Development and implementation of integrated management system

    International Nuclear Information System (INIS)

    Tomov, E.; Nenkova, B.

    2013-01-01

    Risk Engineering Ltd is a private Bulgarian company in the field of scientific technical consultancy and engineering services, established in 1990. The aim of this report is to present the experience of Risk Engineering Ltd. in the development, implementation and operation of an integrated management system. The process of implementation of the system was completed at the end of 2011. In January 2012, the Risk Engineering Integrated Management System was certified by Lloyd's Register for compliance with standards ISO 9001:2008, ISO 140001:2004 and BS OHSAS 18001:2007

  18. Total Quality Management and Organizational Behavior Management: An Integration for Continual Improvement.

    Science.gov (United States)

    Mawhinney, Thomas C.

    1992-01-01

    The history and main features of organizational behavior management (OBM) are compared and integrated with those of total quality management (TQM), with emphasis on W.E. Deming's 14 points and OBM's operant-based approach to performance management. Interventions combining OBM, TQM, and statistical process control are recommended. (DB)

  19. The development of pipeline integrity management in the world and practice in China

    Energy Technology Data Exchange (ETDEWEB)

    Shaohua, Dong; Qing, Wang; Feifan [China National Petroleum Corporation (CNPC), Beijing (China)

    2009-07-01

    The paper analyzed the pipeline integrity management latest development, and the relationship among HSE management, pipeline integrity management (PIM) and asset integrity management (AIM). CNPC is a pioneer of China industry on implementation of pipeline integrity management by using latest developed technologies such as in-line inspection, GIS, Risk assessment and advanced repair technologies, and it is typical model of PIM in China pipeline who supply the gas to whole Beijing city. With smart pigging inspection and implementation of GIS and EAM(enterprise assets management) system on two thousand kilometers of Shaanxi-Beijing gas pipeline BHGC is able to manage pipeline integrity in five areas which include pipe materials safety, nature and geotechnical hazards management, coating and corrosion protection, stationing and associated facilities maintenance, and underground gas storage integrity. This paper presents latest achievement of BHGC in their pipeline integrity programs. (author)

  20. Integrated vector management: The Zambian experience

    Directory of Open Access Journals (Sweden)

    Katebe Cecilia

    2008-08-01

    Full Text Available Abstract Background The Zambian Malaria Control Programme with the Roll Back Malaria (RBM partners have developed the current National Malaria Strategic Plan (NMSP 2006–2011 which focuses on prevention based on the Integrated Vector Management (IVM strategy. The introduction and implementation of an IVM strategy was planned in accordance with the World Health Organization (WHO steps towards IVM implementation namely Introduction Phase, Consolidation Phase and Expansion Phase. Achievements IVM has created commitment for Legal and Regulatory policy review, monitoring, Research and a strong stewardship by the chemical suppliers. It has also leveraged additional resources, improved inter-sectoral collaboration, capacity building and enhanced community participation which facilitated a steady scaling up in coverage and utilisation of key preventive interventions. Thus, markedly reducing malaria incidence and case fatalities in the country. Conclusion Zambia has successfully introduced, consolidated and expanded IVM activities. Resulting in increased coverage and utilization of interventions and markedly reducing malaria-related morbidity and mortality while ensuring a better protection of the environment.

  1. Integrated vector management: the Zambian experience.

    Science.gov (United States)

    Chanda, Emmanuel; Masaninga, Fred; Coleman, Michael; Sikaala, Chadwick; Katebe, Cecilia; Macdonald, Michael; Baboo, Kumar S; Govere, John; Manga, Lucien

    2008-08-27

    The Zambian Malaria Control Programme with the Roll Back Malaria (RBM) partners have developed the current National Malaria Strategic Plan (NMSP 2006-2011) which focuses on prevention based on the Integrated Vector Management (IVM) strategy. The introduction and implementation of an IVM strategy was planned in accordance with the World Health Organization (WHO) steps towards IVM implementation namely Introduction Phase, Consolidation Phase and Expansion Phase. IVM has created commitment for Legal and Regulatory policy review, monitoring, Research and a strong stewardship by the chemical suppliers. It has also leveraged additional resources, improved inter-sectoral collaboration, capacity building and enhanced community participation which facilitated a steady scaling up in coverage and utilisation of key preventive interventions. Thus, markedly reducing malaria incidence and case fatalities in the country. Zambia has successfully introduced, consolidated and expanded IVM activities. Resulting in increased coverage and utilization of interventions and markedly reducing malaria-related morbidity and mortality while ensuring a better protection of the environment.

  2. A Review of Ocean Management and Integrated Resource Management Programs from Around the World

    OpenAIRE

    , Seaplan

    2018-01-01

    This draft report is one of several prepared under contract to the Massachusetts Ocean Partnership (MOP) to support the Massachusetts Executive Office of Energy and Environmental Affairs (EOEEA) in its development of the integrated coastal ocean management plan mandated by the Massachusetts Oceans Act of 2008. The purpose of this report was to inventory and review ocean management and integrated resource management programs from around the world, including the United States, Europe, Australia...

  3. Information for Child Care Providers about Pesticides/Integrated Pest Management

    Science.gov (United States)

    Learn about pesticides/integrated pest management, the health effects associated with exposure to pests and pesticides, and the steps that can be taken to use integrated pest management strategies in childcare facilities.

  4. The role of business information management in advanced integrated environmental management systems

    DEFF Research Database (Denmark)

    Ulhøi, John Parm

    2000-01-01

    investments in the individual company. Secondly, based on the above, to calculate and assess some typical quantifiable savings, e.g. on energy and raw materials, over a period of four years (after the implementation of the integrated environmental management system). In line with other similar investigations......, the study shows that the implementation of systematic and integrated environmental management systems results in significant savings. This supports the general, albeit rarely tested, hypothesis that it pays to be an environmentally responsible enterprise....

  5. Integrated disease management: a critical review of foreign and Portuguese experience.

    Science.gov (United States)

    Coelho, Anabela; Leone, Cláudia; Ribeiro, Vanessa; Sá Moreira, Pedro; Dussault, Gilles

    2014-01-01

    The present article reviews findings from empirical evaluations of integrated disease management programmes. The objective is to provide insights on integration levels, priority interventions and their effect on patient outcomes. The literature review identified 1 251 articles, published from 2006 to 2011. Upon a detailed screening 61 articles were selected for bibliometric analysis and critical discussion. Among several findings, it can be noted that United States of America is the country with the highest amount of published evidence on the subject under study. The most frequently referred disease is diabetes mellitus and the main reported issue of integrated disease management is self-management support. The majority of the studies were developed and exclusively managed by managed care organizations, organized family doctors or hospitals. From a total of 360 interventions reported in studies, patient interventions are the most frequently used across all disease groups, followed by professional interventions. To monitor the effectiveness of the disease programmes, the most frequently used outcomes are patient physiological measures, service use and patient health status. Every country has its own way to implement the integrated disease management strategy. The focus of practice lies on patient empowerment, particularly through self-management. Physiological measures and service use are the outcomes with the highest rate of assessment, which are also the indicators that show higher impact among all integrated disease management programmes. The Portuguese health care system still faces challenges in the coordination and integration of care for patients with chronic disease thus improvements at integrated disease management programmes should be incorporate.

  6. Using remote sensing to inform integrated coastal zone management

    CSIR Research Space (South Africa)

    Roberts, W

    2010-06-01

    Full Text Available TO INFORM INTERGRATED COASTAL ZONE MANAGEMENT GISSA Western Cape Regional Meeting Wesley Roberts & Melanie Luck-Vogel 2 June 2010 CSIR NRE Ecosystems Earth Observation Group What is Integrated Coastal Zone Management? Integrated coastal management... D1D1 B a n d 1 Band 2 Quick theory of CVA Magnitude Direction ( ) ( )22 xaxbyaybM ?+?= Quadrant 1 (++) Accretion Quadrant 2 (-+) Quadrant 4 (+-) Quadrant 3 (--) Erosion CVA Results & Conclusions ? Change in image time series...

  7. Trends in Energy Management Technology: BCS Integration Technologies - Open Communications Networking

    Energy Technology Data Exchange (ETDEWEB)

    Webster, Tom

    2002-09-18

    Our overall purpose in writing this series of articles is to provide Federal energy managers some basic informational tools to assist their decision making process relative to energy management systems design, specification, procurement, and energy savings potential. Since Federal buildings rely on energy management systems more than their commercial counterparts, it is important for energy practitioners to have a high level of knowledge and understanding of these complex systems. This is the second article in a series and will focus on building control system (BCS) networking fundamentals and an assessment of current approaches to open communications protocols. This is important because networking is a complex subject and the networks form the basic infrastructure for energy management functions and for integrating a wide variety of OEM equipment into a complete EMCIS. The first article [1] covered enabling technologies for emerging energy management systems. Future topics will concentrate on more practical aspects including applications software, product offerings, networking strategies, and case studies of actual installations. Please refer to the first article for a more complete overview of the purpose and background for this series.

  8. Integrating Records Management (RM) and Information Technology (IT)

    Energy Technology Data Exchange (ETDEWEB)

    NUSBAUM,ANNA W.; CUSIMANO,LINDA J.

    2000-03-02

    Records Managers are continually exploring ways to integrate their services with those offered by Information Technology-related professions to capitalize on the advantages of providing customers a total solution to managing their records and information. In this day and age, where technology abounds, there often exists a fear on the part of records management that this integration will result in a loss of identity and the focus of one's own mission - a fear that records management may become subordinated to the fast-paced technology fields. They need to remember there is strength in numbers and it benefits RM, IT, and the customer when they can bring together the unique offerings each possess to reach synergy for the benefit of all the corporations. Records Managers, need to continually strive to move ''outside the records management box'', network, expand their knowledge, and influence the IT disciplines to incorporate the concept of ''management'' into their customer solutions.

  9. Design of the Hospital Integrated Information Management System Based on Cloud Platform.

    Science.gov (United States)

    Aijing, L; Jin, Y

    2015-12-01

    At present, the outdated information management style cannot meet the needs of hospital management, and has become the bottleneck of hospital's management and development. In order to improve the integrated management of information, hospitals have increased their investment in integrated information management systems. On account of the lack of reasonable and scientific design, some hospital integrated information management systems have common problems, such as unfriendly interface, poor portability and maintainability, low security and efficiency, lack of interactivity and information sharing. To solve the problem, this paper carries out the research and design of a hospital information management system based on cloud platform, which can realize the optimized integration of hospital information resources and save money.

  10. Co-Leadership - A Management Solution for Integrated Health and Social Care.

    Science.gov (United States)

    Klinga, Charlotte; Hansson, Johan; Hasson, Henna; Sachs, Magna Andreen

    2016-05-23

    Co-leadership has been identified as one approach to meet the managerial challenges of integrated services, but research on the topic is limited. In the present study, co-leadership, practised by pairs of managers - each manager representing one of the two principal organizations in integrated health and social care services - was explored. To investigate co-leadership in integrated health and social care, identify essential preconditions in fulfilling the management assignment, its operationalization and impact on provision of sustainable integration of health and social care. Interviews with eight managers exercising co-leadership were analysed using directed content analysis. Respondent validation was conducted through additional interviews with the same managers. Key contextual preconditions were an organization-wide model supporting co-leadership and co-location of services. Perception of the management role as a collective activity, continuous communication and lack of prestige were essential personal and interpersonal preconditions. In daily practice, office sharing, being able to give and take and support each other contributed to provision of sustainable integration of health and social care. Co-leadership promoted robust management by providing broader competence, continuous learning and joint responsibility for services. Integrated health and social care services should consider employing co-leadership as a managerial solution to achieve sustainability.

  11. Ground Operations Autonomous Control and Integrated Health Management

    Science.gov (United States)

    Daniels, James

    2014-01-01

    The Ground Operations Autonomous Control and Integrated Health Management plays a key role for future ground operations at NASA. The software that is integrated into this system is called G2 2011 Gensym. The purpose of this report is to describe the Ground Operations Autonomous Control and Integrated Health Management with the use of the G2 Gensym software and the G2 NASA toolkit for Integrated System Health Management (ISHM) which is a Computer Software Configuration Item (CSCI). The decision rationale for the use of the G2 platform is to develop a modular capability for ISHM and AC. Toolkit modules include knowledge bases that are generic and can be applied in any application domain module. That way, there's a maximization of reusability, maintainability, and systematic evolution, portability, and scalability. Engine modules are generic, while application modules represent the domain model of a specific application. Furthermore, the NASA toolkit, developed since 2006 (a set of modules), makes it possible to create application domain models quickly, using pre-defined objects that include sensors and components libraries for typical fluid, electrical, and mechanical systems.

  12. Concept of operations : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-06-01

    This concept of operations (Con Ops) for the US-75 Integrated Corridor Management (ICM) Program has been developed as part of the US : Department of Transportation Integrated Corridor Management Initiative, which is an innovative research initiative ...

  13. Integrated Foreign Exchange Risk Management

    DEFF Research Database (Denmark)

    Aabo, Tom; Høg, Esben; Kuhn, Jochen

    Empirical research has focused on export as a proxy for the exchange rate exposure and the use of foreign exchange derivatives as the instrument to deal with this exposure. This empirical study applies an integrated foreign exchange risk management approach with a particular focus on the role...

  14. Health information management using optical storage technology: case studies.

    Science.gov (United States)

    Kohn, D

    1992-05-01

    All the health care facilities examined in the case studies addressed several important organizational issues before and during the installation of their systems. All the facilities examined employee commitment. The prudent managers considered how easily their employees adapt to changes in their jobs and work environment. They considered how enthusiastic cooperation can be fostered in the creation of a liberated and reengineered office. This was determined not only by each individual's reaction to change, but also by the health care facility's track record with other system installations. For example, document image, diagnostic image, and coded data processing systems allow the integration of divergent health care information systems within complex institutions. Unfortunately, many institutions are currently struggling with how to create an information management architecture that will integrate their mature systems, such as their patient care and financial systems. Information managers must realize that if optical storage technology-based systems are used in a strategic and planned fashion, these systems can act as focal points for systems integration, not as promises to further confuse the issue. Another issue that needed attention in all the examples was the work environment. The managers considered how the work environment was going to affect the ability to integrate optical image and data systems into the institution. For example, many of these medical centers have created alliances with clinics, HMOs, and large corporate users of medical services. This created a demand for all or part of the health information outside the confines of the original institution. Since the work environment is composed of a handful of factors such as merged medical services, as many work environment factors as possible were addressed before application of the optical storage technology solution in the institutions. And finally, the third critical issue was the organization of work

  15. Integrating school-based and therapeutic conflict management models at schools.

    Science.gov (United States)

    D'Oosterlinck, Franky; Broekaert, Eric

    2003-08-01

    Including children with emotional and behavioral needs in mainstream school systems leads to growing concern about the increasing number of violent and nonviolent conflicts. Schools must adapt to this evolution and adopt a more therapeutic dimension. This paper explores the possibility of integrating school-based and therapeutic conflict management models and compares two management models: a school-based conflict management program. Teaching Students To Be Peacemakers; and a therapeutic conflict management program, Life Space Crisis Intervention. The authors conclude that integration might be possible, but depends on establishing a positive school atmosphere, the central position of the teacher, and collaborative and social learning for pupils. Further implementation of integrated conflict management models can be considered but must be underpinned by appropriate scientific research.

  16. An Implentation Methodology for Integrated Resource Management in Urban Water Planning

    Science.gov (United States)

    Ebrahimi, G.; Thurm, B.; Klein, D. R.; Öberg, G.

    2014-12-01

    Urban water management requires innovative and integrative approaches to improve sustainability in cities keeping in touch with science progress. Integrated Resource Management (IRM) is one of these strategies and has been developed to integrate various natural and human resources. However, it is becoming increasingly clear that it is challenging to move from vision to implementation. The aim of this paper is to identify strengths and weaknesses of IRM and analyze if the approach might facilitate implementation of sustainability objectives in the water management field. A literature review was performed on peer-reviewed papers that were identified through Google Scholar search for the term 'Integrated Resource Management'. It was found that IRM has been used in a number of contexts such as urban planning, forestry, and management of waste and livestock. Significant implementation challenges are highlighted in the literature. Based on the lessons learned in many different fields, from forestry to communication sciences, important characteristics of IRM approach were found such as the need for adequate governance and strong leaderships, stakeholder's involvement, the learning process and the critical need of appropriate evaluation criteria. We conclude developing an implementation methodology and presenting several recommendations to implement IRM in urban management. While Integrated Water Resource Management (IWRM) is recognized as a fruitful approach to achieve sustainable water management, this study suggests that a shift toward Integrated Resource Management (IRM) can be beneficial as it is designed to facilitate consideration of the interrelationships between various natural and human resources.

  17. Continuous improvement of the BNFL transport integrated management system

    International Nuclear Information System (INIS)

    Hale, J.A.

    1998-01-01

    The integrated Management System of BNFL Transport and Pacific Nuclear Transport Limited (PNTL) is subject to continuous improvement by the application of established improvement techniques adopted by BNFL. The technique currently being used is the application of a Total Quality Management (TQM) philosophy, involving the identification of key processes, benchmarking against existing measures, initiating various improvement projects and applying process changes within the Company. The measurement technique being used is based upon the European Foundation for Quality Management Model (EFQM). A major initiative was started in 1996 to include the requirements of the Environmental Management Systems standard ISO 14001 within the existing integrated management system. This resulted in additional activities added to the system, modification to some existing activities and additional training for personnel. The system was audited by a third party certification organisation, Lloyds Register Quality Assurance (LRQA), during 1997. This paper describes the arrangements to review and update the integrated management system of BNFL Transport and PNTL to include the requirements of the environmental standard ISO 14001 and it also discusses the continuous improvement process adopted by BNFL Transport. (authors)

  18. Examining End-of-Life Case Management: Systematic Review

    Directory of Open Access Journals (Sweden)

    Roger E. Thomas

    2014-01-01

    Full Text Available Case management was initiated in the 1970s to reduce care discontinuity. A literature review focused on end-of-life (EOL case management identified 17 research articles, with content analysis revealing two themes: (a seeking to determine or establish the value of EOL case management and (b identifying ways to improve EOL case management. The evidence, although limited, suggests that EOL case management is helpful to dying individuals and their families. Research is needed to more clearly illustrate its usefulness or outcomes and the extent of need for it and actual availability. Among other benefits, EOL case management may help reduce hospital utilization, a major concern with the high cost of hospital-based care and the increased desire for home-based EOL care.

  19. Project Management Data Retrieval and Integration (PMDRI) Application

    Data.gov (United States)

    Department of Veterans Affairs — The Project Management Data Retrieval and Integration Database (PMDRI) is a system that presents data from the VA Financial Management System(FMS) in a structured...

  20. Experimental application of Business Process Management technology to manage clinical pathways: a pediatric kidney transplantation follow up case.

    Science.gov (United States)

    Andellini, Martina; Fernandez Riesgo, Sandra; Morolli, Federica; Ritrovato, Matteo; Cosoli, Piero; Petruzzellis, Silverio; Rosso, Nicola

    2017-11-03

    To test the application of Business Process Management technology to manage clinical pathways, using a pediatric kidney transplantation as case study, and to identify the benefits obtained from using this technology. Using a Business Process Management platform, we implemented a specific application to manage the clinical pathway of pediatric patients, and monitored the activities of the coordinator in charge of the case management during a 6-month period (from June 2015 to November 2015) using two methodologies: the traditional procedure and the one under study. The application helped physicians and nurses to optimize the amount of time and resources devoted to management purposes. In particular, time reduction was close to 60%. In addition, the reduction of data duplication, the integrated event management and the efficient data collection improved the quality of the service. The use of Business Process Management technology, usually related to well-defined processes with high management costs, is an established procedure in multiple environments; its use in healthcare, however, is innovative. The use of already accepted clinical pathways is known to improve outcomes. The combination of these two techniques, well established in their respective areas of application, could represent a revolution in clinical pathway management. The study has demonstrated that the use of this technology in a clinical environment, using a proper architecture and identifying a well-defined process, leads to real benefits in terms of resources optimization and quality improvement.

  1. Integrating Process Management with Archival Management Systems: Lessons Learned

    Directory of Open Access Journals (Sweden)

    J. Gordon Daines, III

    2009-03-01

    Full Text Available The Integrated Digital Special Collections (INDI system is a prototype of a database-driven, Web application designed to automate and manage archival workflow for large institutions and consortia. This article discusses the how the INDI project enabled the successful implementation of a process to manage large technology projects in the Harold B. Lee Library at Brigham Young University. It highlights how the scope of these technology projects is set and how the major deliverables for each project are defined. The article also talks about how the INDI system followed the process and still failed to be completed. It examines why the process itself is successful and why the INDI project failed. It further underscores the importance of process management in archival management systems.

  2. Economic Exposure and Integrated Risk Management

    OpenAIRE

    Miller, Kent D.

    1994-01-01

    Most corporate risk management research focuses on particular risk exposures to the exclusion of other interrelated exposures. By contrast, this study models corporate risk exposures using a multivariate approach integrating the distinct exposures of interest to finance and strategy researchers. The paper addresses the implications of multivariate modeling for corporate risk management, some key methodological issues arising in empirical estimation of corporate economic exposrues, and direc...

  3. Case Management for Individuals with Mental Retardation. ARC Facts.

    Science.gov (United States)

    Association for Retarded Citizens, Arlington, TX.

    A question-and-answer format is used in this fact sheet to provide information on case management for individuals with mental retardation. The fact sheet describes the major components of a case management system, the role of the case manager, the individual's or family's role in case management, providers of case management services and systems…

  4. The Management of Law Firms Using Business Process Management, Document Management and Web Services Integration

    OpenAIRE

    Roxana Maria Petculet

    2012-01-01

    The aim of this paper is to present the technical solution implemented in the present context for the management of law firms. The informational system consists of the automation of business processes using a BPM engine and electronic archiving using a DMS. The communication between the two modules is made by invoking web services. The whole system integrates modules like: project management, contract management, invoice management, collection, CRM, reporting.

  5. Integrated economic management. Principal aspects and future

    International Nuclear Information System (INIS)

    2004-01-01

    Now that five years have passed (1999-2003) since the Owner Companies decided to merge the Asco and Vandellos-II nuclear power plants, we believe that, for Integrated Management through a single AIE, it is timely and advisable to describe the key issues of the process implemented to optimize economic results, always in accordance with the Policies of Nuclear Safety, Quality and Environment, Prevention, Human Factors and Availability, and we emphasize the following as essential elements: The Corporate Model; strategic/Operating Plans; integrated Economic Management Model SIE; Rationalization of the organizational structure, Continuous Training; Analysis of Processes and Procedures. (Author)

  6. An integration architecture for knowledge management system and business process management system

    NARCIS (Netherlands)

    Jung, J.; Choi, I.; Song, M.S.

    2007-01-01

    Recently, interests in the notion of process-oriented knowledge management (PKM) from academia and industry have been significantly increased. Comprehensive research and development requirements along with a cogent framework, however, have not been proposed for integrating knowledge management (KM)

  7. Law for the Integral Management of Waste No. 8839

    International Nuclear Information System (INIS)

    2010-01-01

    The Law for Integral Waste Management No. 8839 was enacted in Costa Rica in 2010. The purpose of this law has been to regulate the integral management of residues and the efficient use of the resources, through the planning and execution of regulatory actions, operational, financial, administrative, educational, environmental and healthy of monitoring and evaluation [es

  8. Diversity in case management modalities: the Summit model.

    Science.gov (United States)

    Peterson, G A; Drone, I D; Munetz, M R

    1997-06-01

    Though ubiquitous in community mental health agencies, case management suffers from a lack of consensus regarding its definition, essential components, and appropriate application. Meaningful comparisons of various case management models await such a consensus. Global assessments of case management must be replaced by empirical studies of specific interventions with respect to the needs of specific populations. The authors describe a highly differentiated and prescriptive system of case management involving the application of more than one model of service delivery. Such a diversified and targeted system offers an opportunity to study the technology of case management in a more meaningful manner.

  9. Integrated Constructed Wetlands (ICW) for livestock wastewater management.

    Science.gov (United States)

    Harrington, Rory; McInnes, Robert

    2009-11-01

    Social, economic and environmental coherence is sought in the management of livestock wastewater. Wetlands facilitate the biogeochemical processes that exploit livestock wastewater and provide opportunities to achieve such coherence and also to deliver on a range of ecosystem services. The Integrated Constructed Wetland (ICW) concept integrates three inextricably linked objectives: water quantity and quality management, landscape-fit to improve aesthetic site values and enhanced biodiversity. The synergies derived from this explicit integration allow one of the key challenges for livestock management to be addressed. An example utilizing twelve ICW systems from a catchment on the south coast of Ireland demonstrates that over an eight year period mean reduction of total and soluble phosphorus (molybdate reactive phosphorus) exceeded 95% and the mean removal of ammonium-N exceeded 98%. This paper reviews evidence regarding the capacity of ICWs to provide a coherent and sustainable alternative to conventional systems.

  10. Success Factors in Integrated Natural Resource Management R&D: Lessons from Practice

    Directory of Open Access Journals (Sweden)

    Jürgen Hagmann

    2002-01-01

    Full Text Available This paper analyzes integrated natural resource management (INRM lessons and success factors based on a practical case study over more than 10 years in Zimbabwe. The work was geared toward enhancing the adaptive management capacity of the stakeholders in their resource-use systems. One main result was the development and institutionalization of an approach for participatory and integrated NRM research and extension. The INRM approach described is grounded in a learning paradigm and a combination of theories: the constructivist perspective to development, systemic intervention, and learning process approaches. Participatory action research and experiential learning, in which researchers engage themselves as actors rather than neutral analysts in an R&D process to explore the livelihood system and develop appropriate solutions together with the resource users, has shown high potential. However, this should be guided by a clear strategy, impact orientation, and high-quality process facilitation at different levels. The case study revealed the importance of a "reflective practitioner" approach by all actors. More effective response to the challenges of increasing complexity in NRM requires a shift in thinking from the linearity of research-extension-farmer to alternative, multiple-actor institutional arrangements and innovation systems. To overcome the weak attribution of research outcomes to actual impact, it also suggests an alternative to conventional impact assessment in INRM R&D interventions.

  11. Nuclear power plant Angra integrated enterprise management system

    International Nuclear Information System (INIS)

    Andrade, Ronaldo Barata de

    2009-01-01

    The characteristics and peculiarities of the Nuclear Power Plant ANGRA 3 enterprise, amongst which its technical complexity, the size of the project and of the supplies of goods and services contracted for for the Brazilian and foreign scopes, the variety of contractors and participants involved in the implementation, associated with the need of integrated management of all the activities of the enterprise, requires the setting of standardized criteria and procedures to be adopted by the enterprise Project Management Team and by all involved ELETRONUCLEAR (ETN) Units, Suppliers and Contractors for Brazilian and foreign goods and services for the execution of the activities related to overall enterprise planning. These criteria and procedures aim at covering the five Project Management Process Groups: Initiating Process Group, Planning Process Group, Execution Process Group, Monitoring and Controlling Process Group and Closing Process Group. For the ANGRA 3 enterprise, ETN developed the Integrated Enterprise Management System - INTEGRA, being the software 'Primavera Enterprise Project Management' a fundamental part of this system. The aim of this paper is to describe the main concepts involving the ANGRA 3 enterprise management, and the integration between the processes, including all disciplines in all phases of the enterprise life cycle, such as: Nuclear and Environmental Licensing, Infrastructure, National and Foreign Engineering, National and Import Supplies, Civil Works, Electromechanical Erection, Commissioning. (author)

  12. Auditing supports the integration of management systems in the nuclear industry

    International Nuclear Information System (INIS)

    Beckmerhagen, I.A.; Berg, H.P.; Karapetrovic, S.V.; Willborn, W.O.

    2004-01-01

    Integration of function-specific management systems in organizations is rapidly becoming a topic of interest for managers and auditors alike. This is mainly due to the proliferation of management system standards that foster compliance with the stated criteria for quality, environmental, occupational health and safety, social responsibility and other function-specific aspects of performance. While most of the available literature on this topic focuses on the integration of standards, there is comparatively little information available on how to actually build an integrated system internally. This paper hypothesizes that, besides using audits for the implementation of the available procedures, audits can provide an excellent basis for these integration efforts. Therefore the prerequisites, strategies and resources necessary for an effective audit in support of integrated management systems are discussed. The paper also describes how audits are used to improve a combined quality and safety management system at the repository of radioactive waste in Morsleben (Germany). (authors)

  13. An integrated airborne laser scanning approach to forest management and cultural heritage issues: a case study at Porolissum, Romania

    Directory of Open Access Journals (Sweden)

    Anamaria Roman

    2017-07-01

    Full Text Available This paper explores the opportunities that arise where forest ecosystem management and cultural heritage monuments protection converge. The case study area for our analysis was the landscape surrounding the Moigrad-Porolissum Archaeological site. We emphasize that an Airborne Laser Scanning (ALS or LiDAR-Light Detection and Ranging approach to both forest management and cultural heritage conservation is an outstanding tool, assisting policy-makers and conservationists in decision making for integrated planning and management of the environment. LiDAR-derived surface models enabled a synoptic, never-seen-before view of the ancient Roman frontiers defensive systems while also revealing the present forest road network. The thorough and accurate road inventory data are very useful for updating and modifying forest base maps and registries and also for identifying the priority sectors for archaeological discharge. The ability to identify and determine optimal routes for forest management and to locate previously unmapped ancient archaeological remains aids in reducing costs and creating operational efficiencies as well as in complying with the legislation and avoiding infringements. The potential of LiDAR to demonstrate the long-term and comprehensive human impact on wooded areas is discussed. We identified a significant historical landscape change, consisting of a deforestation period, spanning over more than 160 years, during the Roman Period in Dacia (106-271 AD. The transdisciplinary analysis of the LiDAR data provides the base for combining knowledge from archaeology, forestry and environmental history in order to achieve a thorough analysis of the landscape changes and history. In the “nature versus culture” dichotomy, the landscape, outfield areas and forests are primarily perceived as nature, while in reality they are often heavily marked by human impact. LiDAR offers an efficient method for broadening our knowledge regarding the

  14. Integrating Sustainable Development into Operations Management Courses

    Science.gov (United States)

    Fredriksson, Peter; Persson, Magnus

    2011-01-01

    Purpose: It is widely acknowledged that aspects of sustainable development (SD) should be integrated into higher level operations management (OM) education. The aim of the paper is to outline the experiences gained at Chalmers University of Technology in Sweden from integrating aspects of SD into OM courses. Design/methodology/approach: The paper…

  15. The role of requirements management in the design of built environments: a case study

    Directory of Open Access Journals (Sweden)

    Camila Pegoraro

    2011-12-01

    Full Text Available Due to the known difficulties on managing the design process of built environments, researchers and entrepreneurs have continuously developed and implemented best practices from areas such as Project Management (PM. However, there are still gaps to be filled, such as difficulties on monitoring the stakeholder’s requirements and their dynamics. In attempt to eliminate this gap, this paper aims to analyze if requirements management (RM can be integrated to PM and which are the main advantages and disadvantages of this integration. The research includes a literature review which presents PM and RM concepts, the last one based on software engineering approach. Moreover, a case study was performed in a construction company, using semi-structured interviews. The research showed that the use of RM is advantageous, even not solving all the projects difficulties, and that the proper structuring of the projects is a condition for the success of RM implementation. The main contribution is a generic and systematic proposal for integrating the stages of the RM to the projects.

  16. Distribution Integrity Management Plant (DIMP)

    Energy Technology Data Exchange (ETDEWEB)

    Gonzales, Jerome F. [Los Alamos National Laboratory

    2012-05-07

    This document is the distribution integrity management plan (Plan) for the Los Alamos National Laboratory (LANL) Natural Gas Distribution System. This Plan meets the requirements of 49 CFR Part 192, Subpart P Distribution Integrity Management Programs (DIMP) for the LANL Natural Gas Distribution System. This Plan was developed by reviewing records and interviewing LANL personnel. The records consist of the design, construction, operation and maintenance for the LANL Natural Gas Distribution System. The records system for the LANL Natural Gas Distribution System is limited, so the majority of information is based on the judgment of LANL employees; the maintenance crew, the Corrosion Specialist and the Utilities and Infrastructure (UI) Civil Team Leader. The records used in this report are: Pipeline and Hazardous Materials Safety Administration (PHMSA) 7100.1-1, Report of Main and Service Line Inspection, Natural Gas Leak Survey, Gas Leak Response Report, Gas Leak and Repair Report, and Pipe-to-Soil Recordings. The specific elements of knowledge of the infrastructure used to evaluate each threat and prioritize risks are listed in Sections 6 and 7, Threat Evaluation and Risk Prioritization respectively. This Plan addresses additional information needed and a method for gaining that data over time through normal activities. The processes used for the initial assessment of Threat Evaluation and Risk Prioritization are the methods found in the Simple, Handy Risk-based Integrity Management Plan (SHRIMP{trademark}) software package developed by the American Pipeline and Gas Agency (APGA) Security and Integrity Foundation (SIF). SHRIMP{trademark} uses an index model developed by the consultants and advisors of the SIF. Threat assessment is performed using questions developed by the Gas Piping Technology Company (GPTC) as modified and added to by the SHRIMP{trademark} advisors. This Plan is required to be reviewed every 5 years to be continually refined and improved. Records

  17. Case management: developing practice through action research.

    Science.gov (United States)

    Smith, Annetta; Mackay, Seonaid; McCulloch, Kathleen

    2013-09-01

    This article is a report of an action research study carried out with community nurses to help develop case management within their practice. Using action research principles, nurses reviewed and analysed their current practice and developed recommendations for further embedding case management as a means of supporting patients with complex care needs in their own homes. Findings indicate that a number of factors can influence the community nurse's ability to implement case management. These factors include approaches to case finding, availability of resources and interprofessional working. Important considerations for nurses were the influence of the context of care, the geographical location and the health needs of the local patient population, which meant that case management may need to be adapted to meet local circumstances.

  18. Integrated Case Based and Rule Based Reasoning for Decision Support

    OpenAIRE

    Eshete, Azeb Bekele

    2009-01-01

    This project is a continuation of my specialization project which was focused on studying theoretical concepts related to case based reasoning method, rule based reasoning method and integration of them. The integration of rule-based and case-based reasoning methods has shown a substantial improvement with regards to performance over the individual methods. Verdande Technology As wants to try integrating the rule based reasoning method with an existing case based system. This project focu...

  19. Space station operations task force. Panel 4 report: Management integration

    Science.gov (United States)

    1987-01-01

    The Management Integration Panel of the Space Station Operations Task Force was chartered to provide a structure and ground rules for integrating the efforts of the other three panels and to address a number of cross cutting issues that affect all areas of space station operations. Issues addressed include operations concept implementation, alternatives development and integration process, strategic policy issues and options, and program management emphasis areas.

  20. CASE STUDIES IN INTEGRATIVE PSYCHOTHERAPY PART 2 (EDITORIAL

    Directory of Open Access Journals (Sweden)

    Gregor Žvelc

    2013-05-01

    Full Text Available Announcement of the special issue of the International Journal of Integrative Psychotherapy, which is dedicated to the exploration and discussion of an integrative psychotherapy case study.

  1. Integration between environmental management and strategic planning in the oil and gas sector

    International Nuclear Information System (INIS)

    Magrini, Alessandra; Lins, Luiz dos Santos

    2007-01-01

    For activities that have a high possibility of causing environmental accidents, like in the oil and gas sector, it is reasonable to expect the environmental management to be an important variable within the company's strategic planning. However, this is not always true. In some cases, a change in the companies' attitude, abandoning a reactive position and assuming a proactive one, only happens upon the occurrence of serious environmental accidents with strong repercussion in the media. For the company that was the object of study, these accidents gave rise to deep changes in its environmental management, culminating in investments of approximately US$ 2.6 billion in environment, health and security, from 2000 to 2004. This was the highest amount to date invested on these areas by an oil company. This case study seeks to discuss the integration between environmental management and strategic planning in the oil and gas sector over a period of 10 years (from 1995 to 2004) in order to make a contextual analysis of the period before and after the environmental accidents possible

  2. Reflective practice: a framework for case manager development.

    Science.gov (United States)

    Brubakken, Karen; Grant, Sara; Johnson, Mary K; Kollauf, Cynthia

    2011-01-01

    The role of a nurse case manager (NCM) incorporates practice that is built upon knowledge gained in other roles as well as components unique to case management. The concept of reflective practice was used in creating a framework to recognize the developmental stages that occur within community based case management practice. The formation of this framework and its uses are described in this article. The practice setting is a community based case management department in a large midwestern metropolitan health care system with Magnet recognition. Advanced practice nurses provide care for clients with chronic health conditions. Twenty-four narratives were used to identify behaviors of community based case managers and to distinguish stages of practice. The behaviors of advanced practice found within the narratives were labeled and analyzed for similarities. Related behaviors were grouped and descriptor statements were written. These statements grouped into 3 domains of practice: relationship/partnership, coordination/collaboration, and clinical knowledge/decision making. The statements in each domain showed practice variations from competent to expert, and 3 stages were determined. Reliability and validity of the framework involved analysis of additional narratives. The reflective practice process, used for monthly case review presentations, provides opportunity for professional development and group learning focused on improving case manager practice. The framework is also being used in orientation as new case managers acclimate to the role. Reflective writing has unveiled the richness and depth of nurse case manager practice. The depth of knowledge and skills involved in community-based case management is captured within this reflective practice framework. This framework provides a format for describing community based case manager practice development over the course of time and has been used as a tool for orientation and peer review.

  3. Integrated Data for Improved Asset Management

    Science.gov (United States)

    2016-05-26

    The objective of this research is to demonstrate the potential benefits for agency-wide data integration for VDOT asset management. This objective is achieved through an example application that requires information distributed across multiple databa...

  4. Integrated Climate Smart Flood Management for Accra, Ghana ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Home · What we do ... The research team will use evidence to develop an integrated climate smart flood management framework to support policymaking. ... The Ministry of Environment, Science, Technology, and Innovation will manage the ...

  5. Challenges to improving case management of childhood pneumonia at health facilities in resource-limited settings.

    Science.gov (United States)

    Graham, Stephen M; English, Mike; Hazir, Tabish; Enarson, Penny; Duke, Trevor

    2008-05-01

    Effective case management is an important strategy to reduce pneumonia-related morbidity and mortality in children. Guidelines based on sound evidence are available but are used variably. This review outlines current guidelines for childhood pneumonia management in the setting where most child pneumonia deaths occur and identifies challenges for improved management in a variety of settings and different "at-risk" groups. These include appropriate choice of antibiotic, clinical overlap with other conditions, prompt and appropriate referral for inpatient care, and management of treatment failure. Management of neonates, and of HIV-infected or severely malnourished children is more complicated. The influence of co-morbidities on pneumonia outcome means that pneumonia case management must be integrated within strategies to improve overall paediatric care. The greatest potential for reducing pneumonia-related deaths in health facilities is wider implementation of the current guidelines built around a few core activities: training, antibiotics and oxygen. This requires investment in human resources and in equipment for the optimal management of hypoxaemia. It is important to provide data from a variety of epidemiological settings for formal cost-effectiveness analyses. Improvements in the quality of case management of pneumonia can be a vehicle for overall improvements in child health-care practices.

  6. Ergonomics Integration Omproving Production Process Management in Enterprises of Latvia

    OpenAIRE

    Henrijs Kaļķis

    2013-01-01

    Dotoral thesis ERGONOMICS INTEGRATION IMPROVING PRODUCTION PROCESS MANAGEMENT IN ENTERPRISES OF LATVIA ANNOTATION Ergonomics integration in process management has great significance in organisations` growth of productivity. It is a new approach to entrepreneurship and business strategy, where ergonomic aspects and values are taken into account in ensuring the effective process management and profitability of enterprises. This study is aimed at solution of the problem of e...

  7. ICT & innovation: a case of integration in a regional construction firm

    Directory of Open Access Journals (Sweden)

    Graham Brewer

    2013-09-01

    Full Text Available Construction firms in regional areas face considerable challenges to their competitiveness. Logistics, availability of suitable personnel, unfamiliarity with trading partners, and the tyranny of distance conspire to obstruct profitable engagement beyond their local area. Electronic information and communication technology (ICT such as web-based project management applications and other forms of collaborative data sharing have the potential to mitigate many of these obstacles, but have yet to gain widespread acceptance, particularly by smaller regional firms who question their cost effectiveness. The attitudes of decision-makers and the impact of their decisions on intra- and inter-firm culture lie at the heart of ICT-mediated innovation. This paper presents a case study of a specialist subcontractor located in regional New South Wales and its involvement in a New Zealand project, whose competitiveness arose from using ICT to integrate its own supply chain. It also provided additional value by triggering collaboration and integration in the broader project team. The case reveals that these outcomes were symptomatic of the organisational culture of the subcontractor, and were achieved through a combination of leadership, collaboration, flexibility and pragmatism, redolent of dynamic capabilities. 

  8. ICT & innovation: a case of integration in a regional construction firm

    Directory of Open Access Journals (Sweden)

    Graham Brewer

    2013-09-01

    Full Text Available Construction firms in regional areas face considerable challenges to their competitiveness. Logistics, availability of suitable personnel, unfamiliarity with trading partners, and the tyranny of distance conspire to obstruct profitable engagement beyond their local area. Electronic information and communication technology (ICT such as web-based project management applications and other forms of collaborative data sharing have the potential to mitigate many of these obstacles, but have yet to gain widespread acceptance, particularly by smaller regional firms who question their cost effectiveness. The attitudes of decision-makers and the impact of their decisions on intra- and inter-firm culture lie at the heart of ICT-mediated innovation. This paper presents a case study of a specialist subcontractor located in regional New South Wales and its involvement in a New Zealand project, whose competitiveness arose from using ICT to integrate its own supply chain. It also provided additional value by triggering collaboration and integration in the broader project team. The case reveals that these outcomes were symptomatic of the organisational culture of the subcontractor, and were achieved through a combination of leadership, collaboration, flexibility and pragmatism, redolent of dynamic capabilities.

  9. The Integrated Mode Management Interface

    Science.gov (United States)

    Hutchins, Edwin

    1996-01-01

    Mode management is the processes of understanding the character and consequences of autoflight modes, planning and selecting the engagement, disengagement and transitions between modes, and anticipating automatic mode transitions made by the autoflight system itself. The state of the art is represented by the latest designs produced by each of the major airframe manufacturers, the Boeing 747-400, the Boeing 777, the McDonnell Douglas MD-11, and the Airbus A320/A340 family of airplanes. In these airplanes autoflight modes are selected by manipulating switches on the control panel. The state of the autoflight system is displayed on the flight mode annunciators. The integrated mode management interface (IMMI) is a graphical interface to autoflight mode management systems for aircraft equipped with flight management computer systems (FMCS). The interface consists of a vertical mode manager and a lateral mode manager. Autoflight modes are depicted by icons on a graphical display. Mode selection is accomplished by touching (or mousing) the appropriate icon. The IMMI provides flight crews with an integrated interface to autoflight systems for aircraft equipped with flight management computer systems (FMCS). The current version is modeled on the Boeing glass-cockpit airplanes (747-400, 757/767). It runs on the SGI Indigo workstation. A working prototype of this graphics-based crew interface to the autoflight mode management tasks of glass cockpit airplanes has been installed in the Advanced Concepts Flight Simulator of the CSSRF of NASA Ames Research Center. This IMMI replaces the devices in FMCS equipped airplanes currently known as mode control panel (Boeing), flight guidance control panel (McDonnell Douglas), and flight control unit (Airbus). It also augments the functions of the flight mode annunciators. All glass cockpit airplanes are sufficiently similar that the IMMI could be tailored to the mode management system of any modern cockpit. The IMMI does not replace the

  10. Integrating environment health and safety management at Petro-Canada

    International Nuclear Information System (INIS)

    Raymond, G.

    1993-01-01

    Petro-Canada has developed a tool to integrate, measure, and improve its management systems of environment, health, and safety (EH ampersand S). This tool, called the Total Loss Management System, is described in the areas of general management issues, policies and procedures, evaluations, organization, stewardship, issue management, and performance measures. Petro-Canada's policies on occupational health and safety are consistent with its environmental policy, being structured in the same way. An integrated audit system is used to cover health, safety, industrial hygiene, reliability, environment, and risk management. EH ampersand S matters are integrated at the corporate level in a separate department. Regional divisions review EH ampersand S performance every month, incidents are discussed, and preventive measures are taken as necessary. Regional performances are combined every quarter for ultimate presentation to the Petro-Canada board. New or emerging issues that may affect divisions are assigned an issue sponsor, a member of divisional management who makes sure the issue receives the resources necessary to study and define its impact. Examples of issues include soil contamination, process hazard management, and benzene exposure limits. Performance measures flow from the corporate environment and occupational health and safety policies, and come in two types: those that measure activities to improve performance and those that measure the outcome of the activities

  11. Integrated nanomaterials for extreme thermal management: a perspective for aerospace applications.

    Science.gov (United States)

    Barako, Michael T; Gambin, Vincent; Tice, Jesse

    2018-04-02

    Nanomaterials will play a disruptive role in next-generation thermal management for high power electronics in aerospace platforms. These high power and high frequency devices have been experiencing a paradigm shift toward designs that favor extreme integration and compaction. The reduction in form factor amplifies the intensity of the thermal loads and imposes extreme requirements on the thermal management architecture for reliable operation. In this perspective, we introduce the opportunities and challenges enabled by rationally integrating nanomaterials along the entire thermal resistance chain, beginning at the high heat flux source up to the system-level heat rejection. Using gallium nitride radio frequency devices as a case study, we employ a combination of viewpoints comprised of original research, academic literature, and industry adoption of emerging nanotechnologies being used to construct advanced thermal management architectures. We consider the benefits and challenges for nanomaterials along the entire thermal pathway from synthetic diamond and on-chip microfluidics at the heat source to vertically-aligned copper nanowires and nanoporous media along the heat rejection pathway. We then propose a vision for a materials-by-design approach to the rational engineering of complex nanostructures to achieve tunable property combinations on demand. These strategies offer a snapshot of the opportunities enabled by the rational design of nanomaterials to mitigate thermal constraints and approach the limits of performance in complex aerospace electronics.

  12. Integrated nanomaterials for extreme thermal management: a perspective for aerospace applications

    Science.gov (United States)

    Barako, Michael T.; Gambin, Vincent; Tice, Jesse

    2018-04-01

    Nanomaterials will play a disruptive role in next-generation thermal management for high power electronics in aerospace platforms. These high power and high frequency devices have been experiencing a paradigm shift toward designs that favor extreme integration and compaction. The reduction in form factor amplifies the intensity of the thermal loads and imposes extreme requirements on the thermal management architecture for reliable operation. In this perspective, we introduce the opportunities and challenges enabled by rationally integrating nanomaterials along the entire thermal resistance chain, beginning at the high heat flux source up to the system-level heat rejection. Using gallium nitride radio frequency devices as a case study, we employ a combination of viewpoints comprised of original research, academic literature, and industry adoption of emerging nanotechnologies being used to construct advanced thermal management architectures. We consider the benefits and challenges for nanomaterials along the entire thermal pathway from synthetic diamond and on-chip microfluidics at the heat source to vertically-aligned copper nanowires and nanoporous media along the heat rejection pathway. We then propose a vision for a materials-by-design approach to the rational engineering of complex nanostructures to achieve tunable property combinations on demand. These strategies offer a snapshot of the opportunities enabled by the rational design of nanomaterials to mitigate thermal constraints and approach the limits of performance in complex aerospace electronics.

  13. Integrated information and logistics management, quality management and firm performance of pork processing industry in China

    NARCIS (Netherlands)

    Han, J.; Trienekens, J.H.; Omta, S.W.F.

    2009-01-01

    Purpose – This paper seeks to discuss the interactions amongst integrated information technology (IT), integrated logistics management, quality management practices and firm performance of pork processors in China. Design/methodology/approach – A conceptual framework was developed by examining the

  14. Integrated vector management for malaria control

    Directory of Open Access Journals (Sweden)

    Impoinvil Daniel E

    2008-12-01

    Full Text Available Abstract Integrated vector management (IVM is defined as "a rational decision-making process for the optimal use of resources for vector control" and includes five key elements: 1 evidence-based decision-making, 2 integrated approaches 3, collaboration within the health sector and with other sectors, 4 advocacy, social mobilization, and legislation, and 5 capacity-building. In 2004, the WHO adopted IVM globally for the control of all vector-borne diseases. Important recent progress has been made in developing and promoting IVM for national malaria control programmes in Africa at a time when successful malaria control programmes are scaling-up with insecticide-treated nets (ITN and/or indoor residual spraying (IRS coverage. While interventions using only ITNs and/or IRS successfully reduce transmission intensity and the burden of malaria in many situations, it is not clear if these interventions alone will achieve those critical low levels that result in malaria elimination. Despite the successful employment of comprehensive integrated malaria control programmes, further strengthening of vector control components through IVM is relevant, especially during the "end-game" where control is successful and further efforts are required to go from low transmission situations to sustained local and country-wide malaria elimination. To meet this need and to ensure sustainability of control efforts, malaria control programmes should strengthen their capacity to use data for decision-making with respect to evaluation of current vector control programmes, employment of additional vector control tools in conjunction with ITN/IRS tactics, case-detection and treatment strategies, and determine how much and what types of vector control and interdisciplinary input are required to achieve malaria elimination. Similarly, on a global scale, there is a need for continued research to identify and evaluate new tools for vector control that can be integrated with

  15. Area-wide integrated pest management and the sterile insect technique

    International Nuclear Information System (INIS)

    Klassen, W.

    2005-01-01

    Area-wide integrated pest management (AW-IPM) focuses on the preventive management of pest populations throughout the ecosystem. It seeks to treat all habitats of the pest population so that none produces migrants to re-establish significant infestations in areas of concern. In contrast, the conventional strategy focuses narrowly on defending the valued entity (crop, livestock, people, buildings, etc.) from direct attack by pests. AW-IPM requires multiyear planning, and an organization dedicated exclusively to its implementation, whereas conventional pest management involves minimal forward planning, tends to be reactive, and is implemented independently by individual producers, businesses, or households. AW-IPM tends to utilize advanced technologies, whereas the conventional strategy tends to rely on traditional tactics and tools. The sterile insect technique (SIT) is a species-specific form of birth control imposed on the pest population. It is a powerful tool for 'mopping up' sparse pest populations, and is most efficient when applied as a tactic in a system deployed on an area-wide basis. On environmental, economic and biological grounds, the case for the SIT is compelling. (author)

  16. INTEGRATED SAFETY MANAGEMENT SYSTEM IN AIR TRAFFIC SERVICES

    Directory of Open Access Journals (Sweden)

    Volodymyr Kharchenko

    2014-06-01

    Full Text Available The article deals with the analysis of the researches conducted in the field of safety management systems.Safety management system framework, methods and tools for safety analysis in Air Traffic Control have been reviewed.Principles of development of Integrated safety management system in Air Traffic Services have been proposed.

  17. 49 CFR 195.452 - Pipeline integrity management in high consequence areas.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Pipeline integrity management in high consequence... Management § 195.452 Pipeline integrity management in high consequence areas. (a) Which pipelines are covered... that could affect a high consequence area, including any pipeline located in a high consequence area...

  18. Effects of top management involvement in integrated marketing communications

    Directory of Open Access Journals (Sweden)

    Nina Hočevar

    2007-12-01

    Full Text Available There is scarce empirical evidence in the academic literature of how top management involvement influences the degree of integrated marketing communications. At the same time, some authors believe that this relationship should be explored more extensively.In this paper we present one possible approach to investigating the relationship between top management involvement and the degree of integrated marketing communications. Our research established that a greater involvement of top management in marketing communications could be associated with a higher degree of IMC. Investigating the relationship between management and IMC is indeed at a very early stage. We suggest that this study has provided a basis for future research on the relationship between top management involvement in marketing communications and the degree of IMC.

  19. Integrated management system implementation strategy for PUSPATI TRIGA Reactor

    International Nuclear Information System (INIS)

    Phongsakorn Prak Tom; Shaharum Ramli; Mohamad Azman Che Mat Isa; Shahirah Abdul Rahman; Mohd Zaid Mohamed; Mat Zin Mat Husin; Nurfazila Husain; Mohamad Puad Abu

    2012-01-01

    Integrated Management System (IMS) designed to fulfil the requirements integrates safety, health, environmental, security, quality and economic elements. PUSPATI TRIGA Reactor (RTP) is currently implementing the Quality Assurance Program (QAP) and looking toward implementation of IMS. This paper discussed the implementation strategy of IMS for RTP. There are nine steps of IMS implementation strategy. In implementation of IMS, Gantt chart is useful project management tool in managing the project frame work. IMS is intended as a tool to enable the continuous development of safety culture and achieve higher safety levels. (author)

  20. Integrated Services Management System (ISMS): A management and decision making tool

    Energy Technology Data Exchange (ETDEWEB)

    Barber, D.S.; Brockman, D.L.; Buxton, L.D. [and others

    1995-10-01

    This document provides information concerning the Integrated Services Management System (ISMS) that was developed for the Laboratories Services Division during the period February 1994 through May 1995. ISMS was developed as a formal method for centralized management of programs within the Division. With minor modifications, this system can be adapted for management of all overhead functions at SNL or for sector level program management. Included in this document are the reasons for the creation of this system as well as the resulting benefits. The ISMS consists of six interlinked processes; Issues Management, Task/Activity Planning, Work Decision, Commitment Management, Process/Project Management, and Performance Assessment. Those processes are described in detail within this document. Additionally, lessons learned and suggestions for future improvements are indicated.

  1. Toward integrated design of waste management technologies

    International Nuclear Information System (INIS)

    Carnes, S.A.; Wolfe, A.K.

    1994-01-01

    Implementation of waste management technologies has been hindered by the intervention of diverse interests. Relying on a perceived history of inadequate and improper management, operations, and technological design, critics have stymied the implementation of scientifically and governmentally approved technologies and facilities, leading to a critical shortage of hazardous, mixed, and radioactive waste management capacity. The research and development (R ampersand D) required to identify technologies that are simultaneously (1) scientifically valid, (2) economically sound, and (3) publicly acceptable must necessarily address, in an integrated and interdisciplinary manner, these three criteria and how best to achieve the integration of stakeholders early in the technology implementation process (i.e., R ampersand D, demonstration, and commercialization). The goal of this paper is to initiate an identification of factors likely to render radioactive and hazardous waste management technologies publicly acceptable and to provide guidance on how technological R ampersand D might be revised to enhance the acceptability of alternative waste management technologies. Principal among these factors are the equitable distribution of costs, risks, and benefits of waste management policies and technologies, the equitable distribution of authority for making waste management policy and selecting technologies for implementation, and the equitable distribution of responsibility for resolving waste management problems. Stakeholder participation in assessing the likely distribution of these factors and mitigative mechanisms to enhance their equitable distribution, together with stakeholder participation in policy and technology R ampersand D, as informed by stakeholder assessments, should enhance the identification of acceptable policies and technologies

  2. Integrated corridor management : phase I, concept development and foundational research. Task 3.4, identify integrated corridor management institutional strategies and administration

    Science.gov (United States)

    2006-04-12

    Task 3 involves overall foundational research to further the understanding of various aspects of Integrated Corridor Management (ICM) and to identify integration issues needed to evaluate the feasibility of the ICM initiative. The focus of Task 3.4 a...

  3. An evidence-based approach to case management model selection for an acute care facility: is there really a preferred model?

    Science.gov (United States)

    Terra, Sandra M

    2007-01-01

    This research seeks to determine whether there is adequate evidence-based justification for selection of one acute care case management model over another. Acute Inpatient Hospital. This article presents a systematic review of published case management literature, resulting in classification specific to terms of level of evidence. This review examines the best available evidence in an effort to select an acute care case management model. Although no single case management model can be identified as preferred, it is clear that adequate evidence-based literature exists to acknowledge key factors driving the acute care model and to form a foundation for the efficacy of hospital case management practice. Although no single case management model can be identified as preferred, this systematic review demonstrates that adequate evidence-based literature exists to acknowledge key factors driving the acute care model and forming a foundation for the efficacy of hospital case management practice. Distinctive aspects of case management frameworks can be used to guide the development of an acute care case management model. The study illustrates: * The effectiveness of case management when there is direct patient contact by the case manager regardless of disease condition: not only does the quality of care increase but also length of stay (LOS) decreases, care is defragmented, and both patient and physician satisfaction can increase. * The preferred case management models result in measurable outcomes that can directly relate to, and demonstrate alignment with, organizational strategy. * Acute care management programs reduce cost and LOS, and improve outcomes. * An integrated case management program that includes social workers, as well as nursing, is the most effective acute care management model. * The successful case management model will recognize physicians, as well as patients, as valued customers with whom partnership can positively affect financial outcomes in terms of

  4. Integrated Pest Management: A Curriculum for Early Care and Education Programs

    Science.gov (United States)

    California Childcare Health Program, 2011

    2011-01-01

    This "Integrated Pest Management Toolkit for Early Care and Education Programs" presents practical information about using integrated pest management (IPM) to prevent and manage pest problems in early care and education programs. This curriculum will help people in early care and education programs learn how to keep pests out of early…

  5. Conscious worst case definition for risk assessment, part I: a knowledge mapping approach for defining most critical risk factors in integrative risk management of chemicals and nanomaterials.

    Science.gov (United States)

    Sørensen, Peter B; Thomsen, Marianne; Assmuth, Timo; Grieger, Khara D; Baun, Anders

    2010-08-15

    This paper helps bridge the gap between scientists and other stakeholders in the areas of human and environmental risk management of chemicals and engineered nanomaterials. This connection is needed due to the evolution of stakeholder awareness and scientific progress related to human and environmental health which involves complex methodological demands on risk management. At the same time, the available scientific knowledge is also becoming more scattered across multiple scientific disciplines. Hence, the understanding of potentially risky situations is increasingly multifaceted, which again challenges risk assessors in terms of giving the 'right' relative priority to the multitude of contributing risk factors. A critical issue is therefore to develop procedures that can identify and evaluate worst case risk conditions which may be input to risk level predictions. Therefore, this paper suggests a conceptual modelling procedure that is able to define appropriate worst case conditions in complex risk management. The result of the analysis is an assembly of system models, denoted the Worst Case Definition (WCD) model, to set up and evaluate the conditions of multi-dimensional risk identification and risk quantification. The model can help optimize risk assessment planning by initial screening level analyses and guiding quantitative assessment in relation to knowledge needs for better decision support concerning environmental and human health protection or risk reduction. The WCD model facilitates the evaluation of fundamental uncertainty using knowledge mapping principles and techniques in a way that can improve a complete uncertainty analysis. Ultimately, the WCD is applicable for describing risk contributing factors in relation to many different types of risk management problems since it transparently and effectively handles assumptions and definitions and allows the integration of different forms of knowledge, thereby supporting the inclusion of multifaceted risk

  6. Standardization process aligned to integrated management system: the case of TRANSPETRO's Oil Pipelines and Terminals Unit

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Maria Fatima Ludovico de [Pontificia Universidade Catolica do Rio de Janeiro (PUC-Rio/ITUC), Rio de Janeiro, RJ (Brazil). Instituto Tecnologico; Labrunie, Charles; Araujo, Dario Doria de [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil). Diretoria de Terminais e Oleodutos

    2009-07-01

    This paper presents the implementation by PETROBRAS Transporte S.A. - TRANSPETRO of its Oil Pipelines and Terminals Standardization Program (PRONOT) within the scope of the 'Integrated Management System' (IMS). This program, launched in 2006 in the regions where the company operates, aims at standardizing all of its oil pipeline and terminal operations. Its implementation was planned in two phases: the first, already successfully concluded, refers to pipeline operations, industrial maintenance and right-of-way activities management; and the second, initiated in 2009, encompasses cross-sectional activities including health, safety and environment (HSE); training and development of oil pipeline workforce; communication with stake holders; oil pipeline integrity; and engineering project requirements. The documental structures of TRANSPETRO IMS and PRONOT are described and represented graphically to emphasize the intentional alignment of the standardization process carried out by the Oil Pipelines and Terminals Unit to the corporate IMS, based upon national and international literature review and through practical research focusing on the best international practices. (author)

  7. IMPLEMENTATION OF INTEGRAL SYSTEM OF QUALITY MANAGEMENT IN TOURISM

    Directory of Open Access Journals (Sweden)

    Vidoje Vujic

    2007-12-01

    Full Text Available Theory and practice have corroborated the need and usefulness of an integral approach to quality management in tourist destinations, since the destination and its touristic offer define a number of disparate participants and interested parties. An integral system of quality management is one of the models of touristic management that with the implementation of contemporary principles strives to achieve business excellence and competitory advantage. The paper determines and projects the need and importance of implementing an integral system and accordingly seeks to form a model for its development. By studying the oneness of the whole we have established the dependence and firm connections between particular norms and elements, and by analyzing them in this paper we describe the structure and associated characteristics of the whole.

  8. Development and design of an integrated information management system for safe management of radioactive waste

    Energy Technology Data Exchange (ETDEWEB)

    Son, Dong Chan; Hong, Suk Young; An, Kyoung Il [Daesang Information Technology Co., Ltd., Seoul (Korea, Republic of)

    2004-05-15

    An integrated data management system for the safe management of radioactive waste and spent fuel in Korea is developed to collect basic information, provide the framework for national regulation, and improve national competition and efficiency in the management of radioactive waste and spent fuel. This system can also provide public access to information such as a statistical graphs and integrated data from various waste generators to meet increased public needs and interests. Objectives can be summarized as; the five principles (independence, openness, clearance, efficiency and reliance) of safety regulation can be realized. Public understanding and reliance on the safety of spent fuel and radioactive waste management can be promoted by providing reliable information. Ensure an openness within the international nuclear community and efficiently support international agreements among contracting parties by operating safe and efficient management of spent fuel and radioactive waste (IAEA joint convention on the safety of spent fuel management and on the safety of radioactive waste management). The system can compensate for the imperfections In safe regulation of radioactive waste and spent fuel management related to waste generation, storage and disposal, and make it possible to holistic control. Re-organize the basic framework of KINS's intermediate and long term research organization and trends, regarding waste management policy is to integrate safe management and unit safe disposal.

  9. Development and design of an integrated information management system for safe management of radioactive waste

    International Nuclear Information System (INIS)

    Son, Dong Chan; Hong, Suk Young; An, Kyoung Il

    2004-05-01

    An integrated data management system for the safe management of radioactive waste and spent fuel in Korea is developed to collect basic information, provide the framework for national regulation, and improve national competition and efficiency in the management of radioactive waste and spent fuel. This system can also provide public access to information such as a statistical graphs and integrated data from various waste generators to meet increased public needs and interests. Objectives can be summarized as; the five principles (independence, openness, clearance, efficiency and reliance) of safety regulation can be realized. Public understanding and reliance on the safety of spent fuel and radioactive waste management can be promoted by providing reliable information. Ensure an openness within the international nuclear community and efficiently support international agreements among contracting parties by operating safe and efficient management of spent fuel and radioactive waste (IAEA joint convention on the safety of spent fuel management and on the safety of radioactive waste management). The system can compensate for the imperfections In safe regulation of radioactive waste and spent fuel management related to waste generation, storage and disposal, and make it possible to holistic control. Re-organize the basic framework of KINS's intermediate and long term research organization and trends, regarding waste management policy is to integrate safe management and unit safe disposal

  10. Case mix management education in a Canadian hospital.

    Science.gov (United States)

    Moffat, M; Prociw, M

    1992-01-01

    The Sunnybrook Health Science Centre's matrix organization model includes a traditional departmental structure, a strategic program-based structure and a case management-based structure--the Clinical Unit structure. The Clinical Unit structure allows the centre to give responsibility for the management of case mix and volume to decentralized Clinical Unit teams, each of which manages its own budget. To train physicians and nurses in their respective roles of Medical Unit directors and Nursing Unit directors, Sunnybrook designed unique short courses on financial management and budgeting, and case-costing and case mix management. This paper discusses how these courses were organized, details their contents and explains how they fit into Sunnybrook's program of decentralized management.

  11. Integrated pest management - an overview and update

    Science.gov (United States)

    Thomas D. Landis; R. Kasten Dumroese

    2014-01-01

    Integrated pest management, better known as IPM, is a familiar term for those of us working in forest, conservation, and native plant nurseries. An almost synonymous concept is "holistic pest management" that has been the topic of chapters in recent Agriculture Handbooks that would be useful to growers of native plants (see Landis and others 2009; Landis and...

  12. Corporate Motivation for Integrated Management System Implementation, Why do Firms Engage in Integration of Management Systems: A Literature Review & Research Agenda

    NARCIS (Netherlands)

    Asif, M.; Asif, M.; de Bruijn, E.J.; Fisscher, O.A.M.

    2008-01-01

    Integration of management systems such as for quality, environment, occupational health and safety, risk management, and corporate social responsibilities is a viable organisational approach to cost reduction, efficient utilization of resources, greater motivation of employees, and better compliance

  13. Integral system of management quality - company quality assurance

    International Nuclear Information System (INIS)

    Dimitrovski, Aleksandar

    1999-01-01

    Integral System of Management Quality is imposed as a solution which in the future will be applied in the companies more frequently, provoked from the needs for solving management quality, working conditions, ecology, safety at work, way of leaving, etc. (Original)

  14. Integrated nutrients management for 'desi' cotton

    International Nuclear Information System (INIS)

    Qazi, M.A.; Akram, M.; Ahmad, N.; Khattak, M.A.

    2007-01-01

    Intensive cropping with no return of crop residues and other organic inputs result in the loss of soil organic matter (SOM) and nutrient supply in (Desi) cotton-wheat cropping system in Pakistan. For appraisal of problem and finding solution to sustainability, we evaluated six treatments comprised of two fertilizer doses and three management techniques over a period of three years (2003-05) monitoring their effects on seed cotton yield and soil fertility. The techniques included chemical fertilizers, municipal solid waste manure (MSWM) integrated with chemical fertilizers in 1:4 ratios with, and without pesticides. The results revealed that cotton yields. Were enhanced by 19% due to site-specific fertilizer dose over conventional dose. Ignoring weeds control by means of herbicided application resulted in 5% decrease of seed cotton yield in IPNM technique positive effect of MSWM integration was noted on soil test phosphorus and SOM. Site-specific fertilizer application and integrated plant nutrient management by MSWM proved their suitability as the techniques not only improve soil quality in terms of sustained levels of organic matter and phosphorus but also provide a safe way of waste disposal. (author)

  15. Supply Chain Management and Sustainability: Procrastinating Integration in Mainstream Research

    Directory of Open Access Journals (Sweden)

    Marisa P. de Brito

    2010-03-01

    Full Text Available Research has pointed out opportunities and research agendas to integrate sustainability issues with supply chain and operations management. However, we find that it is still not mainstream practice to systematically take a sustainability approach in tackling supply chain and operations management issues. In this paper, we make use of behavioral theory to explain the current lack of integration. We conclude through abductive reasoning that the reasons for procrastinating integration of sustainability in supply chain and operations management research are the conflicting nature of the task and the inherent context, which is the focus on operations rather than environmental or social issues.

  16. What Case Managers Should Know About Their Roles and Functions: A National Study From the Commission for Case Manager Certification: Part 1.

    Science.gov (United States)

    Tahan, Hussein M; Watson, Annette C; Sminkey, Patrice V

    2015-01-01

    The purpose of this national role and function study was to identify the essential activities and necessary knowledge areas for effective case manager practice from the perspective of those currently functioning in various care settings and across diverse professional disciplines. The national study covered all case management practices and/or work settings across the full continuum of health care. This cross-sectional descriptive study used the practice analysis method and online survey research design. It employed a purposive sample of case managers, in which 52,370 individuals received an invitation to participate. Data collection completed over a 4-week period, resulting in 7,668 useable survey responses (nearly a 15% response rate). The study identified the common activities and knowledge areas necessary for competent and effective performance of case managers, as is highlighted in this article, which is the first of a 2-part series on the role and function study. The results informed the needed update of the test specifications for the Certified Case Manager (CCM) certification examination, as will be delineated in Part 2 of the article series, to ensure that it continues to be substantiated in current practice. Of special note are the emergence of specific activity and knowledge domains in the area of case management ethical, legal, and practice standards, and an increase in the number of employers requiring certified case managers to fill vacant positions and compensating them financially for such qualifications. This study helps keep the CCM credentialing examination evidence-based and maintain its validity for evaluating competency of case managers. Specifically, the study identified essential activities and knowledge domains that define competent case management practice. Findings can be used for developing programs and curricula for the training and development of case managers. The study instrument also can be used for further research of case

  17. The innovation and practice of management improved by integration management information system in nuclear enterprise

    International Nuclear Information System (INIS)

    Zhang Fan; Cheng Lihong; Li Qisheng; Ge Zhengfa

    2012-01-01

    This article expounds that Hunan Taohuajiang Nuclear Power Company generally programs the route of company's core business and implements its integration through referencing the experience of informationization construction of other enterprises at the beginning of the foundation of this company, and summarizes the experience of system construction and analyses the innovation and signification of the integrative management information system to the nu- clear power enterprise management from data unified, resources sharing and business electronic and the management improvement of this company. (authors)

  18. Integrated tracking, classification, and sensor management theory and applications

    CERN Document Server

    Krishnamurthy, Vikram; Vo, Ba-Ngu

    2012-01-01

    A unique guide to the state of the art of tracking, classification, and sensor management. This book addresses the tremendous progress made over the last few decades in algorithm development and mathematical analysis for filtering, multi-target multi-sensor tracking, sensor management and control, and target classification. It provides for the first time an integrated treatment of these advanced topics, complete with careful mathematical formulation, clear description of the theory, and real-world applications. Written by experts in the field, Integrated Tracking, Classification, and Sensor Management provides readers with easy access to key Bayesian modeling and filtering methods, multi-target tracking approaches, target classification procedures, and large scale sensor management problem-solving techniques.

  19. Bayesian approaches for Integrated Water Resources Management. A Mediterranean case study.

    Science.gov (United States)

    Gulliver, Zacarías; Herrero, Javier; José Polo, María

    2013-04-01

    This study presents the first steps of a short-term/mid-term analysis of the water resources in the Guadalfeo Basin, Spain. Within the basin the recent construction of the Rules dam has required the development of specific management tools and structures for this water system. The climate variability and the high water demand requirements for agriculture irrigation and tourism in this region may cause different controversies in the water management planning process. During the first stages of the study a rigorous analysis of the Water Framework Directive results was done in order to implement the legal requirements and the solutions for the gaps identified by the water authorities. In addition, the stakeholders and water experts identified the variables and geophysical processes for our specific water system case. These particularities need to be taken into account and are required to be reflected in the final computational tool. For decision making process purposes in a mid-term scale, a bayesian network has been used to quantify uncertainty which also provides a structure representation of probabilities, actions-decisions and utilities. On one hand by applying these techniques it is possible the inclusion of decision rules generating influence diagrams that provides clear and coherent semantics for the value of making an observation. On the other hand the utility nodes encode the stakeholders preferences which are measured on a numerical scale, choosing the action that maximizes the expected utility [MEU]. Also this graphical model allows us to identify gaps and project corrective measures, for example, formulating associated scenarios with different event hypotheses. In this sense conditional probability distributions of the seasonal water demand and waste water has been obtained between the established intervals. This fact will give to the regional water managers useful information for future decision making process. The final display is very visual and allows

  20. RISK MANAGEMENT: AN INTEGRATED APPROACH TO RISK MANAGEMENT AND ASSESSMENT

    Directory of Open Access Journals (Sweden)

    Szabo Alina

    2012-12-01

    Full Text Available Purpose: The objective of this paper is to offer an overview over risk management cycle by focusing on prioritization and treatment, in order to ensure an integrated approach to risk management and assessment, and establish the ‘top 8-12’ risks report within the organization. The interface with Internal Audit is ensured by the implementation of the scoring method to prioritize risks collected from previous generated risk report. Methodology/approach: Using evidence from other research in the area and the professional expertise, this article outlines an integrated approach to risk assessment and risk management reporting processes, by separating the risk in two main categories: strategic and operational risks. The focus is on risk prioritization and scoring; the final output will comprise a mix of strategic and operational (‘top 8-12’ risks, which should be used to establish the annual Internal Audit plan. Originality/value: By using an integrated approach to risk assessment and risk management will eliminate the need for a separate Internal Audit risk assessment over prevailing risks. It will reduce the level of risk assessment overlap by different functions (Tax, Treasury, Information System over the same risk categories as a single methodology, is used and will align timings of risk assessment exercises. The risk prioritization by usage of risk and control scoring criteria highlights the combination between financial and non-financial impact criteria allowing risks that do not naturally lend themselves to a financial amount to be also assessed consistently. It is emphasized the usage of score method to prioritize the risks included in the annual audit plan in order to increase accuracy and timelines.

  1. [Application of supply chain integration management of medical consumables].

    Science.gov (United States)

    Zhang, Jian

    2013-07-01

    This paper introduces the background, the content, the information management system of material supply chain integration management and the consumables management process. The system helps to expand the selection of hospital supplies varieties, to reduce consumables management costs, to improve the efficiency of supplies, to ensure supplies safety, reliability and traceability.

  2. Integrating habitat restoration and fisheries management : A small-scale case-study to support EEL conservation at the global scale

    Directory of Open Access Journals (Sweden)

    Ciccotti E.

    2013-02-01

    Full Text Available The aim of this work was to develop a methodological framework for the management of local eel stocks that integrates habitat restoration with optimal fishery management. The Bolsena lake (Viterbo, Italy and its emissary, the river Marta, were taken as a reference system. The river flows in the Mediterranean sea but its course is fragmented by a number of dams built in the past century preventing eel migration from and to the sea. Eel fishery in the Bolsena lake is thus sustained by periodic stocking of glass eels caught at the Marta river estuary. A detailed demographic model was applied to simulate fishery yields and potential spawner escapement under different recruitment and management scenarios. It was estimated that the high exploitation rates occurring in the nineties reduced the potential spawner escapement from the Bolsena lake to less than 1 t; under current harvesting rates, the potential spawner escapement is estimated in about 12 t while in pristine conditions (i.e. high recruitment and no fishing estimated spawner escapement is about 21 t. This analysis thus showed that current fishery management would comply with the 40% spawner escapement requirement of the EU regulation 1100/2007 if the connections between the Bolsena lake emissary and the sea were fully re-established. This confirms the opportunity of an integrated approach to management at the catchment area level scale for eel populations, that shall hopefully contribute to the conservation of the global stock.

  3. Integrated Guidelines for Management of Alloy 600 Locations

    Energy Technology Data Exchange (ETDEWEB)

    Na, Kyung-Hwan; Chung, Hansub; Yang, Jun-Seog; Lee, Kyoung-Soo [KHNP-Central Research Institute, Daejeon (Korea, Republic of)

    2015-05-15

    The locations experiencing PWSCC include steam generator tubes, pressurizer instrumental nozzles, control rod driving mechanism(CRDM) penetration nozzles, reactor outlet nozzles, and bottom mounted instrumental(BMI) nozzles. Korea Hydro and Nuclear Power Co.(KHNP) has developed integrated guidelines for management of alloy 600 locations and the guidelines are under review by the regulator. The guidelines consist of alloy 600 location database, inspection program, maintenance/preventive maintenance method, and finally water chemistry management for PWSCC mitigation. In this paper, the detailed contents are presented. The integrated guidelines collected all relevant information on the management of alloy 600 locations. This information may be useful for establishing the most effective preventive maintenance strategies by prioritization in addition to maintenance strategies. Table II summarize maintenance strategies for alloy 600 locations.

  4. The role of water and sediment connectivity in integrated flood management: a case study on the island of Saint Lucia

    Science.gov (United States)

    Jetten, Victor; van Westen, Cees; Ettema, Janneke; van den Bout, Bastian

    2016-04-01

    Disaster Risk Management combines the effects of natural hazards in time and space, with elements at risk, such as ourselves, infrastructure or other elements that have a value in our society. The risk in this case is defined as the sum of potential consequences of one or more hazards and can be expressed as potential damages. Generally, we attempt to reduce risk by better risk management, such as increase of resilience, protection and spatial planning. Caribbean islands are hit by hurricanes and tropical storms with a frequency of 1 to 2 every 10 years, with devastating consequences in terms of flash floods and landslides. The islands basically consist of a central (volcanic) mountain range, with medium and small sized catchments radiating outward towards the ocean. The coastal zone is inhabited, while the ring road network is essential for functioning of the island. An example of a case study is given for the island of Saint Lucia. Recorded rainfall intensities during tropical storms of 12 rainfall stations surpass 200 mm/h, causing immediate flash floods. Very often however, sediment is a forgotten variable in flash flood management: protection and mitigation measures as well as spatial planning all focus on the hydrology, the extent and depth of flood water, and sometimes of flood velocities. With recent developments, the opensource model LISEM includes hydrology and runoff, flooding, and erosion, transport and deposition both in runoff, channel flow and flood waters. We will discuss the practical solutions we implemented in connecting slopes, river channels and floodplains in terms of water and sediment, and the strength and weaknesses we have encountered so far. Catchment analysis shows two main effects: on the one hand in almost all cases upstream flooding serves as a temporary water storage that prevents further damage downstream, while on the other hand, erosion upstream often blocks bridges and decreases channel storage downstream, which increases the

  5. Links between environmental management and the company's other management systems especially the quality mangement system

    DEFF Research Database (Denmark)

    Bjarnø, Ole-Christian; Larsen, Lars Bjørn

    1999-01-01

    Based on a literature survey and case material from several companies, this paper try to highlight some of the difficulties related to the integration of environmental management, as well as some of the advantages and disadvantages of the integration.......Based on a literature survey and case material from several companies, this paper try to highlight some of the difficulties related to the integration of environmental management, as well as some of the advantages and disadvantages of the integration....

  6. The 5C model: A new approach to asset integrity management

    International Nuclear Information System (INIS)

    Rahim, Yousif; Refsdal, Ingbjorn; Kenett, Ron S.

    2010-01-01

    As organizations grow more complex in operation and more global in scope, assets and technical integrity become key success factors. A company's asset integrity business process needs to be mapped in order to 1) provide a proper overview of operation and business processes, 2) identify all critical interfaces and 3) ensure that all gaps and overlaps in processes are eliminated. Achieving asset integrity requires companies to sustain their activities and identify the hazards, weaknesses and objectives of their strategic assets. Technical integrity emphasizes a complete overview of technical conditions and related information, and the ability of the companies to document the technical state of its assets. It is based on an integrated view of the current state of operations, and the identification of all critical interfaces, in order to ensure that all gaps and unnecessary overlaps in processes are eliminated. Companies look increasingly at their asset integrity management system as a means to extend the life of their assets, beyond the original design conditions and production capacity. Establishing an asset integrity management system requires the documentation of the company's technical integrity management, a strategy and the processes for carrying it out, identifying gaps; selecting corrective interventions and conducting follow up actions. The paper discusses various aspects of asset integrity management, including its planning and implementation. We begin with an introduction to asset technical integrity, provide some theoretical backgrounds, present a model we call 5C and conclude with a summary and discussion.

  7. Integrating Medical Supply as Part of the Army's Single Integrated Materiel Manager Concept--Why or why Not?

    National Research Council Canada - National Science Library

    Baxter, Shelia

    1998-01-01

    .... To achieve the goal of seamless logistics integration capabilities, one concept is to establish a Single Integrated Materiel Manager for the Army which envisions integrating all such functions...

  8. Study on Case Teaching of Financial Management

    Science.gov (United States)

    Che, Zhenghong; Che, Zhengmei

    2011-01-01

    Case teaching is an efficient teaching method of management. It plays an important role to enhance the students' ability to practice the theory. However, case teaching of financial management has not achieved the expected results. The paper aims to study the importance, characteristics and corresponding methods of case teaching method of financial…

  9. Formulation of an Integrated Community Based Disaster Management for Hydroelectric facilities: The Malaysia Case

    Science.gov (United States)

    Hijazzi, Norshamirra; Thiruchelvam, Sivadass; Sabri Muda, Rahsidi; Nasharuddin Mustapha, Kamal; Che Muda, Zakaria; Ghazali, Azrul; Kamal Kadir, Ahmad; Hakimie, Hazlinda; Sahari, Khairul Salleh Mohamed; Hasini, Hasril; Mohd Sidek, Lariyah; Itam, Zarina; Fadhli Mohamad, Mohd; Razad, Azwin Zailti Abdul

    2016-03-01

    Dams, however significant their contributions are to the society, are not immune to failures and diminishing lifespan not unlike other structural elements in our infrastructure. Despite continuing efforts on design, construction, operation, and maintenance of dams to improve the safety of the dams, the possibility of unforeseen events of dam failures is still possible. Seeing that dams are usually integrated into close approximities with the community, dam failures may consequent in tremendous loss of lives and properties. The aims of formulation of Integrated Community Based Disaster Management (ICBDM) is to simulate evacuation modelling and emergency planning in order to minimize loss of life and property damages in the event of a dam-related disaster. To achieve the aim above, five main pillars have been identified for the formulation of ICBDM. A series of well-defined program inclusive of hydrological 2-D modelling, life safety modelling, community based EWS and CBTAP will be conducted. Finally, multiple parties’ engagement is to be carried out in the form of table top exercise to measure the readiness of emergency plans and response capabilities of key players during the state of a crisis.

  10. Integrated online energy and battery life management for hybrid long haulage truck

    NARCIS (Netherlands)

    Pham, H.T.; Kessels, J.T.B.A.; Bosch, van den P.P.J.; Huisman, R.G.M.

    2014-01-01

    Battery lifetime management plays an important role for successful commercializing hybrid electric vehicles. This paper aims at integrating the battery lifetime management into the energy management system of a heavy-duty hybrid electric truck. The developed strategy called Integrated Energy

  11. INTEGRATIVE PSYCHOTHERAPY AND MINDFULNESS: THE CASE OF SARA

    OpenAIRE

    Mihael Černetič

    2015-01-01

    The article explores the relationship between Integrative Psychotherapy and mindfulness on a theoretical as well as practical level. Although mindfulness is not an explicit constituent of Integrative Psychotherapy, the two are arguably a natural fit. Mindfulness has the potential to enhance internal and external contact, a central concept in Integrative Psychotherapy, as well as strengthen a client’s Adult ego state. This article presents a case study whereby Integrative Psychotherapy is ana...

  12. Structural Integrity Management for Fixed Offshore Platforms in Malaysia

    OpenAIRE

    Narayanan Sambu Potty; Mohammad Kabir B. Mohd Akram

    2009-01-01

    Structural Integrity Management (SIM) is important for the protection of offshore crew, environment, business assets and company and industry reputation. API RP 2A contained guidelines for assessment of existing platforms mostly for the Gulf of Mexico (GOM). ISO 19902 SIM framework also does not specifically cater for Malaysia. There are about 200 platforms in Malaysia with 90 exceeding their design life. The Petronas Carigali Sdn Bhd (PCSB) uses the Asset Integrity Management ...

  13. Key factors of case management interventions for frequent users of healthcare services: a thematic analysis review.

    Science.gov (United States)

    Hudon, Catherine; Chouinard, Maud-Christine; Lambert, Mireille; Diadiou, Fatoumata; Bouliane, Danielle; Beaudin, Jérémie

    2017-10-22

    The aim of this paper was to identify the key factors of case management (CM) interventions among frequent users of healthcare services found in empirical studies of effectiveness. Thematic analysis review of CM studies. We built on a previously published review that aimed to report the effectiveness of CM interventions for frequent users of healthcare services, using the Medline, Scopus and CINAHL databases covering the January 2004-December 2015 period, then updated to July 2017, with the keywords 'CM' and 'frequent use'. We extracted factors of successful (n=7) and unsuccessful (n=6) CM interventions and conducted a mixed thematic analysis to synthesise findings. Chaudoir's implementation of health innovations framework was used to organise results into four broad levels of factors: (1) ,environmental/organisational level, (2) practitioner level, (3) patient level and (4) programme level. Access to, and close partnerships with, healthcare providers and community services resources were key factors of successful CM interventions that should target patients with the greatest needs and promote frequent contacts with the healthcare team. The selection and training of the case manager was also an important factor to foster patient engagement in CM. Coordination of care, self-management support and assistance with care navigation were key CM activities. The main issues reported by unsuccessful CM interventions were problems with case finding or lack of care integration. CM interventions for frequent users of healthcare services should ensure adequate case finding processes, rigorous selection and training of the case manager, sufficient intensity of the intervention, as well as good care integration among all partners. Other studies could further evaluate the influence of contextual factors on intervention impacts. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2017. All rights reserved. No commercial use is permitted

  14. Integrating the traditional and the modern conflict management ...

    African Journals Online (AJOL)

    The study examines the modalities for integrating traditional and modern conflict management strategies in Nigeria using an analysis of relevant documents as well as Black's Social Control Theory and Thomas-Kilmann's Model of Conflict Management. The successful amalgamation of diverse groups has radically shifted ...

  15. RISK MANAGEMENT: AN INTEGRATED APPROACH TO RISK MANAGEMENT AND ASSESSMENT

    OpenAIRE

    Szabo Alina

    2012-01-01

    Purpose: The objective of this paper is to offer an overview over risk management cycle by focusing on prioritization and treatment, in order to ensure an integrated approach to risk management and assessment, and establish the ‘top 8-12’ risks report within the organization. The interface with Internal Audit is ensured by the implementation of the scoring method to prioritize risks collected from previous generated risk report. Methodology/approach: Using evidence from other research in ...

  16. Implementing Integrated Multicultural Instructional Design in Management Education

    Science.gov (United States)

    Schultz, Jennifer L.; Higbee, Jeanne L.

    2011-01-01

    This purpose of this paper is to summarize the principles of integrated multicultural instructional design (IMID; Higbee, Goff, & Schultz, in press; Higbee, Schultz, & Goff, 2010) and present specific strategies for incorporating IMID in management education. The primary goal of IMID is to promote the integration of multicultural content…

  17. A SURVEY ON INDIAN EXPERIENCE ON INTEGRATED MANAGEMENT STANDARDS (IMS

    Directory of Open Access Journals (Sweden)

    H. Khanna

    2009-09-01

    Full Text Available Adoption of management systems standards is a key issue in manufacturing industry in India. Following the global trend quality and environmental issues are gaining importance. However the number of ISO 14001 certified companies are much less in India as compared to ISO 9001. The integration of ISO 14001 with ISO 9001 may help companies to sustain competitive advantage and overcome disappointments with quality standards and in turn encourage companies to adopt good environmental practices. The aim of this research is to study the implementation of integrated management standards (IMS by the manufacturing organizations in India. The different aspects of integration and benefits of IMS implementation are analyzed. This r esearch is based on empirical study carried out in Indian manufacturing firms, involving the application of a questionnaire. This questionnaire was tested on 50 manufacturing companies in India. The study reveals that focus on stakeholders; top management commitment and training are critical success factors for implementation of IMS. The main benefits of integration are discussed. The small sample size is one of the major limitations of this study. The paper informs the managers in manufacturing organizations and practitioners of management system standards especially in developing countries about IMS and will enable them to adopt IMS in future so that those organizations may not implement multiple and overlapping MSS(Management System Standards.

  18. Software requirements management based on use cases

    International Nuclear Information System (INIS)

    Xiao Jin

    2009-01-01

    In this paper, the requirements management based on use cases is theoretically explored, and a multi-layer use-case model is introduced, which combined with three levels of use cases and a single use-case refinement model. Through the practice in a software project, the multi-layer use-case model provides a good solution on how to control the requirements scope and change, and provides the balance of work assignment between customer departments, information management departments and software development outsourcing team. (authors)

  19. A modeling framework for integrated harvest and habitat management of North American waterfowl: Case-study of northern pintail metapopulation dynamics

    Science.gov (United States)

    Mattsson, Brady J.; Runge, M.C.; Devries, J.H.; Boomer, G.S.; Eadie, J.M.; Haukos, D.A.; Fleskes, J.P.; Koons, D.N.; Thogmartin, W.E.; Clark, R.G.

    2012-01-01

    We developed and evaluated the performance of a metapopulation model enabling managers to examine, for the first time, the consequences of alternative management strategies involving habitat conditions and hunting on both harvest opportunity and carrying capacity (i.e., equilibrium population size in the absence of harvest) for migratory waterfowl at a continental scale. Our focus is on the northern pintail (Anas acuta; hereafter, pintail), which serves as a useful model species to examine the potential for integrating waterfowl harvest and habitat management in North America. We developed submodel structure capturing important processes for pintail populations during breeding, fall migration, winter, and spring migration while encompassing spatial structure representing three core breeding areas and two core nonbreeding areas. A number of continental-scale predictions from our baseline parameterization (e.g., carrying capacity of 5.5 million, equilibrium population size of 2.9 million and harvest rate of 12% at maximum sustained yield [MSY]) were within 10% of those from the pintail harvest strategy under current use by the U.S. Fish and Wildlife Service. To begin investigating the interaction of harvest and habitat management, we examined equilibrium population conditions for pintail at the continental scale across a range of harvest rates while perturbing model parameters to represent: (1) a 10% increase in breeding habitat quality in the Prairie Pothole population (PR); and (2) a 10% increase in nonbreeding habitat quantity along in the Gulf Coast (GC). Based on our model and analysis, a greater increase in carrying capacity and sustainable harvest was seen when increasing a proxy for habitat quality in the Prairie Pothole population. This finding and underlying assumptions must be critically evaluated, however, before specific management recommendations can be made. To make such recommendations, we require (1) extended, refined submodels with additional

  20. Integrated emergency management in KKG

    International Nuclear Information System (INIS)

    Kluegel, J.U.; Plank, H.

    2007-01-01

    The development and introduction of emergency measures in Switzerland was mainly characterized by the evaluation of international experience and by systematic analysis of beyond-design basis accidents within the framework of plant-specific probabilistic safety analyses. As early as in the mid-eighties, the Swiss regulatory authority demanded that measures be taken against severe accidents, and periodically added more detailed requirements, most recently in 2000 when the introduction of Severe Accident Management Guidelines (SMAG) was demanded for power operation as well as operation in the non-power mode. The SMAG were introduced at the Goesgen nuclear power station within a project in the period between 2003 and 2005. For this purpose, a concept of integrated emergency management was developed which is based on updates of the proven emergency manual. One important aspect of this integrative concept is the distinction between preventive and mitigating procedures by defining appropriate criteria. The findings made in the implementation phase of the project include the realization that the introduction of procedures dealing with severe accidents also requires the ability to develop new ways of thinking and acting in accident management. This implies the awareness that procedures covering severe accidents must be applied much more flexibly and in the light of the situation than regulations covering fault conditions. Also possibilities to simulate severe accidents were created within the project both for the development of procedures and for training plant operators and members of the emergency staff. (orig.)

  1. Co-Leadership – A Management Solution for Integrated Health and Social Care

    Directory of Open Access Journals (Sweden)

    Charlotte Klinga

    2016-05-01

    Full Text Available Introduction: Co-leadership has been identified as one approach to meet the managerial challenges of integrated services, but research on the topic is limited. In the present study, co-leadership, practised by pairs of managers – each manager representing one of the two principal organizations in integrated health and social care services – was explored. Aim: To investigate co-leadership in integrated health and social care, identify essential preconditions in fulfilling the management assignment, its operationalization and impact on provision of sustainable integration of health and social care. Method: Interviews with eight managers exercising co-leadership were analysed using directed content analysis. Respondent validation was conducted through additional interviews with the same managers. Results: Key contextual preconditions were an organization-wide model supporting co-leadership and co-location of services. Perception of the management role as a collective activity, continuous communication and lack of prestige were essential personal and interpersonal preconditions. In daily practice, office sharing, being able to give and take and support each other contributed to provision of sustainable integration of health and social care.  Conclusion and discussion: Co-leadership promoted robust management by providing broader competence, continuous learning and joint responsibility for services. Integrated health and social care services should consider employing co-leadership as a managerial solution to achieve sustainability.

  2. Managing the tensions in integrating global organisations : The role of performance management systems

    NARCIS (Netherlands)

    Busco, C.; Giovannoni, E.; Scapens, R.W.

    The paper explores the role of performance management systems (PMSs) in integrating global organisations (GOs). It investigates the ways in which the diverse entities that comprise a GO can be co-ordinated and integrated to achieve a global unity of effort, while leaving space for local adaptation,

  3. Integrated refinery waste management

    Energy Technology Data Exchange (ETDEWEB)

    Shieh, Y -S [ETG Environmental, Inc., Blue Bell, PA (US); Sheehan, W J [Separation and Recovery Systems, Inc., Irvine, CA (US)

    1992-01-01

    In response to the RCRA land ban regulations and TC rule promulgated by the U.S. Federal Environmental Protection Agency (EPA) in 1988-1990, an Integrated Refinery Waste Management (IRWM) program has been developed to provide cost-effective solutions to petroleum industry customers. The goal of IRWM is to provide technology based remediation treatment services to manage sludges and wastewaters generated from the oil refining processes, soils contaminated with petroleum distillates and groundwater contaminated with fuels. Resource recovery, volume reduction and waste minimization are the primary choices to mitigate environmental problems. Oil recovery has been performed through phase separation (such as centrifugation and filtration) and heating of heavy oils. Volume reduction is achieved by dewatering systems such as centrifuges and filter presses, and low temperature thermal treatment. Waste minimization can be accomplished by bioremediation and resource recovery through a cement kiln. (Author).

  4. Plant life management. Progress for structural integrity

    International Nuclear Information System (INIS)

    Solin, J.

    2003-03-01

    A joint project cluster of industry, VTT and other R and D suppliers is dealing with managing of lifetime of critical structures and components in energy and process industry. The research topics include systematic component lifetime management, data management, integrity and lifetime of pressure bearing components, non-destructive inspection, interactions of coolant and materials, environmentally assisted cracking and ageing of reactor internals. This Symposium is a compilation of selected papers describing an intermediate status of the projects after three years of research and development. (orig.)

  5. Competitiveness in organizational integrated computer system project management

    Directory of Open Access Journals (Sweden)

    Zenovic GHERASIM

    2010-06-01

    Full Text Available The organizational integrated computer system project management aims at achieving competitiveness by unitary, connected and personalised treatment of the requirements for this type of projects, along with the adequate application of all the basic management, administration and project planning principles, as well as of the basic concepts of the organisational information management development. The paper presents some aspects of organizational computer systems project management competitiveness with the specific reference to some Romanian companies’ projects.

  6. Control and management of distribution system with integrated DERs via IEC 61850 based communication

    Directory of Open Access Journals (Sweden)

    Ikbal Ali

    2017-06-01

    Full Text Available Distributed Energy Resources (DERs are being increasingly integrated in the distribution systems and resulting in complex power flow scenarios. In such cases, effective control, management and protection of distribution systems becomes highly challenging. Standardized and interoperable communication in distribution systems has the potential to deal with such challenges to achieve higher energy efficiency and reliability. Ed. 2 of IEC 61850 standards, for utility automation, standardizing the exchange of data among different substations, DERs, control centers, PMUs and PDCs. This paper demonstrates the modelling of information and services needed for control, management and protection of distribution systems with integrated DERs. This paper has used IP tunnels and/or mapping over IP layer for transferring IEC 61850 messages, such as sample values (SVs and GOOSE (Generic Object Oriented Substation Event, over distribution system Wide Area Network (WAN. Finally performance of the proposed communication configurations for different applications is analyzed by calculating End-to-End (ETE delay, throughput and jitter.

  7. INTEGRATED SUSTAINABLE MANGROVE FOREST MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Cecep Kusmana

    2015-07-01

    Full Text Available Mangrove forest as a renewable resource must be managed based on sustainable basis in which the benefits of ecological, economic and social from the forest have to equity concern in achieving the optimum forest products and services in fulfill the needs of recent generation without destruction of future generation needs and that does not undesirable effects on the physical and social environment. This Sustainable Forest Management (SFM practices needs the supporting of sustainability in the development of social, economic and environment (ecological sounds simultaneously, it should be run by the proper institutional and regulations. In operational scale, SFM need integration in terms of knowledge, technical, consultative of stakeholders, coordination among sectors and other stakeholders, and considerations of ecological inter-relationship in which mangroves as an integral part of both a coastal ecosystem and a watershed (catchment area. Some tools have been developed to measure the performent of SFM, such as initiated by ITTO at 1992 and followed by Ministry of Forestry of Indonesia (1993, CIFOR (1995, LEI (1999, FSC (1999, etc., however, the true nuance of SFM’s performance is not easy to be measured. 

  8. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  9. A clear case. Selective investment in case management applications can yield significant returns.

    Science.gov (United States)

    Hagland, Mark

    2009-03-01

    Strategically conceived case management system implementation makes good patient care and business sense, CIOs agree. Significant financial savings can be achieved from case management IS implementations, if those implementations are executed in the context of partnership between clinical leaders and the CIO's team. CIOs agree that applying the concept of "investment" to the implementation of case management IT can make resource allocation decisions easier.

  10. Understanding Organizational Memory from the Integrated Management Systems (ERP)

    OpenAIRE

    Gilberto Perez; Isabel Ramos

    2013-01-01

    With this research, in the form of a theoretical essay addressing the theme of Organizational Memory and Integrated Management Systems (ERP), we tried to present some evidence of how this type of system can contribute to the consolidation of certain features of Organizational Memory. From a theoretical review of the concepts of Human Memory, extending to the Organizational Memory and Information Systems, with emphasis on Integrated Management Systems (ERP) we tried to draw a parallel between ...

  11. Development of SFR Research and Integration Management System (S-RIMS)

    International Nuclear Information System (INIS)

    Cho, Chung Ho; Chang, Jin Wook; Kim, Young Gyun; Kim, Yeong Il

    2011-01-01

    Up to the present, the management of research and development (R and D) for a sodium cooled fast reactor (SFR) could be individually performed on each project without an organic relationship. However, a more systemic and effective integrated management of a project is required because the research and development environment is currently changing. Thus, we developed a Research and Integration Management System for SFR (S-RIMS) based on the enterprise project management (EPM) solution. The functional goals of the S-RIMS are as follows: 1. Provide data that show the progress and status of a project 2. Manage the design process and R and D products 3. Share the consistent design data between sub-projects

  12. CANDU plant life management - An integrated approach

    International Nuclear Information System (INIS)

    Hopkins, J.R.

    1998-01-01

    An integrated approach to plant life management has been developed for CANDU reactors. Strategies, methods, and procedures have been developed for assessment of critical systems structures and components and for implementing a reliability centred maintenance program. A Technology Watch program is being implemented to eliminate 'surprises'. Specific work has been identified for 1998. AECL is working on the integrated program with CANDU owners and seeks participation from other CANDU owners

  13. Time management for case managers--so much work, so little time.

    Science.gov (United States)

    Cesta, Toni

    2014-08-01

    The world of a case manager is a busy one, and you may not have all the resources you need each and every day. If you can maintain a routine it will make the workload more manageable for you and will allow room for those surprises that invariably happen. Whether you are a new or a seasoned case manager, organizing your workload can always help smooth out the rough edges in anyone's hectic day!

  14. Research on integrated managing system based on CIMS for nuclear power plant safety

    International Nuclear Information System (INIS)

    Zhou Gang

    2006-01-01

    In order to improve safety, economy and reliability of operation for nuclear power plant (NPP), a novel integrated managing method was proposed based on the ideas of computer and contemporary integrated manufacturing system (CIMS). The application of CIMS to nuclear power plant safety management was researched. In order to design an integrated managing system to meet the needs of NPP safety management, all work related to nuclear safety is divided into different category according to its characters. On basis of this work, general integrated managing system was designed at first. Then subsystems were designed and every subsystem implements a category of nuclear safety management work. All subsystems are independent relatively on the one hand and are interrelated on other hand by global information system. (authors)

  15. Energy efficiency through integrated environmental management.

    Science.gov (United States)

    Benromdhane, Souad Ahmed

    2015-05-01

    Integrated environmental management became an economic necessity after industrial development proved to be unsustainable without consideration of environmental direct and indirect impacts. Energy dependency and air pollution along with climate change grew into major challenges facing developed and developing countries alike. Thus, a new global market structure emerged and changed the way we do trade. The search intensified for alternatives to petroleum. However, scientists, policy makers, and environmental activists agreed to focus on strategic conservation and optimization of energy use. Environmental concerns will remain partially unaddressed with the current pace of consumption because greenhouse gas emissions will continue to rise with economic growth. This paper discusses energy efficiency, steady integration of alternative sources, and increased use of best available technologies. Energy criteria developed for environmental labeling certification are presented. Our intention is to encourage manufacturers and service providers to supply consumers with less polluting and energy-consuming goods and services, inform consumers of the environmental and energy impacts, and thereby instill sustainable and responsible consumption. As several programs were initiated in developed countries, environmental labeling requirements created barriers to many exports manufactured in developing countries, affecting current world trade and putting more pressure on countries to meet those requirements. Defining an institutional and legal framework of environmental labeling is a key challenge in implementing such programs for critical economic sectors like tourism, textiles, and food production where energy needs are the most important aspect to control. A case study of Tunisia and its experience with eco-labeling is presented.

  16. Integrated Water Resources Management: A Global Review

    Science.gov (United States)

    Srinivasan, V.; Cohen, M.; Akudago, J.; Keith, D.; Palaniappan, M.

    2011-12-01

    The diversity of water resources endowments and the societal arrangements to use, manage, and govern water makes defining a single paradigm or lens through which to define, prioritize and evaluate interventions in the water sector particularly challenging. Integrated Water Resources Management (IWRM) emerged as the dominant intervention paradigm for water sector interventions in the early 1990s. Since then, while many successful implementations of IWRM have been demonstrated at the local, basin, national and trans-national scales, IWRM has also been severely criticized by the global water community as "having a dubious record that has never been comprehensively analyzed", "curiously ambiguous", and "ineffective at best and counterproductive at worst". Does IWRM hold together as a coherent paradigm or is it a convenient buzzword to describe a diverse collection of water sector interventions? We analyzed 184 case study summaries of IWRM interventions on the Global Water Partnership (GWP) website. The case studies were assessed to find the nature, scale, objectives and outcomes of IWRM. The analysis does not suggest any coherence in IWRM as a paradigm - but does indicate distinct regional trends in IWRM. First, IWRM was done at very different scales in different regions. In Africa two-thirds of the IWRM interventions involved creating national or transnational organizations. In contrast, in Asia and South America, almost two-thirds were watershed, basin, or local body initiatives. Second, IWRM interventions involved very different types of activities in different regions. In Africa and Europe, IWRM entailed creation of policy documents, basin plans and institution building. In contrast, in Asia and Latin America the interventions were much more likely to entail new technology, infrastructure or watershed measures. In Australia, economic measures, new laws and enforcement mechanisms were more commonly used than anywhere else.

  17. Numbers, systems, people: how interactions influence integration. Insights from case studies of HIV and reproductive health services delivery in Kenya.

    Science.gov (United States)

    Mayhew, Susannah H; Sweeney, Sedona; Warren, Charlotte E; Collumbien, Martine; Ndwiga, Charity; Mutemwa, Richard; Lut, Irina; Colombini, Manuela; Vassall, Anna

    2017-11-01

    Drawing on rich data from the Integra evaluation of integrated HIV and reproductive-health services, we explored the interaction of systems hardware and software factors to explain why some facilities were able to implement and sustain integrated service delivery while others were not. This article draws on detailed mixed-methods data for four case-study facilities offering reproductive-health and HIV services between 2009 and 2013 in Kenya: (i) time-series client flow, tracking service uptake for 8841 clients; (ii) structured questionnaires with 24 providers; (iii) in-depth interviews with 17 providers; (iv) workload and facility data using a periodic activity review and cost-instruments; and (v) contextual data on external activities related to integration in study sites. Overall, our findings suggested that although structural factors like stock-outs, distribution of staffing and workload, rotation of staff can affect how integrated care is provided, all these factors can be influenced by staff themselves: both frontline and management. Facilities where staff displayed agency of decision making, worked as a team to share workload and had management that supported this, showed better integration delivery and staff were able to overcome some structural deficiencies to enable integrated care. Poor-performing facilities had good structural integration, but staff were unable to utilize this because they were poorly organized, unsupported or teams were dysfunctional. Conscientious objection and moralistic attitudes were also barriers.Integra has demonstrated that structural integration is not sufficient for integrated service delivery. Rather, our case studies show that in some cases excellent leadership and peer-teamwork enabled facilities to perform well despite resource shortages. The ability to provide support for staff to work flexibly to deliver integrated services and build resilient health systems to meet changing needs is particularly relevant as health

  18. Ontario Hydro's integrated air management plan

    International Nuclear Information System (INIS)

    Kalvins, A.K.; Brown, D.; Camacho, F.; Howes, H.; Jantzi, B.; Lin, X.; Lui, P.; Melo, O.T.; Mortimer, W.P.; Reuber, B.

    1992-01-01

    Ontario Hydro is developing an integrated air management plan as a tool for comparing the environmental impacts of fossil-fuel power generation options. The goal is to relate equipment, location, emissions, and impacts and to identify the optimum way to manage the utility's fossil generation system in view of upcoming environmental regulations and public expectations. The eight steps of the plan are briefly described: definition of power generation scenarios (upgrading, conversion to natural gas, non-utility generation, alternative technologies); estimation of emissions for each generation and fuel option studied; identification of impact of air emissions on building materials, agriculture, forests, lakes, and fisheries; modelling of air emissions dispersion; quantification of damage to pollution receptors; quantification of full fuel cycle effects; and comparison of the scenarios. The scenario having the lowest overall environmental impact involved upgrading the existing fossil-fuel system with additional air emissions controls and two integrated gasification combined cycle plants. 9 refs., 3 figs., 3 tabs

  19. Factors influencing implementation of integrated management of ...

    African Journals Online (AJOL)

    intern

    implementation of health facility based Integrated Management of Childhood Illness ... community-owned resource persons (CORPs) to provide health education to care ... differing coverage of basic essential services such safe water supply, ...

  20. Integrated Pest Management of the Southern Pine Beetle

    Science.gov (United States)

    Robert N. Coulson; Hannu Saarenmaa

    2011-01-01

    Integrated pest management (IPM) is the maintenance of destructive agents, including insects, at tolerable levels by the planned use of a variety of preventive, suppressive, or regulatory tactics and strategies that are ecologically and economically efficient and socially and politically acceptable. It is explicit that the actions taken are fully integrated into the...

  1. Integrated project management information systems: the French nuclear industry experience

    International Nuclear Information System (INIS)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-01-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK)

  2. Integrated project management information systems: the French nuclear industry experience

    Energy Technology Data Exchange (ETDEWEB)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-03-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK).

  3. Case managers' experiences of personal growth: learning from consumers.

    Science.gov (United States)

    Stein, Catherine H; Craft, Scott A

    2007-04-01

    This study examines aspects of case managers' perceived personal growth in their work with consumers. Using a sample of 98 case managers, the psychometric properties of a brief self-report measure of personal growth of case managers were examined. The Case Manager Personal Growth Scale (CMPG) showed good reliability and construct validity as evidenced by negative correlations with scores on professional burnout and positive correlations with personal accomplishment and job satisfaction scores. CMPG scores were unrelated to social desirability scores or caseload size and positively related to age and tenure in the mental health system. Results suggest the strong relevance of the construct of personal growth for case managers.

  4. A Framework for Integration of IVHM Technologies for Intelligent Integration for Vehicle Management

    Science.gov (United States)

    Paris, Deidre E.; Trevino, Luis; Watson, Mike

    2005-01-01

    As a part of the overall goal of developing Integrated Vehicle Health Management (IVHM) systems for aerospace vehicles, the NASA Faculty Fellowship Program (NFFP) at Marshall Space Flight Center has performed a pilot study on IVHM principals which integrates researched IVHM technologies in support of Integrated Intelligent Vehicle Management (IIVM). IVHM is the process of assessing, preserving, and restoring system functionality across flight and ground systems (NASA NGLT 2004). The framework presented in this paper integrates advanced computational techniques with sensor and communication technologies for spacecraft that can generate responses through detection, diagnosis, reasoning, and adapt to system faults in support of IIVM. These real-time responses allow the IIVM to modify the effected vehicle subsystem(s) prior to a catastrophic event. Furthermore, the objective of this pilot program is to develop and integrate technologies which can provide a continuous, intelligent, and adaptive health state of a vehicle and use this information to improve safety and reduce costs of operations. Recent investments in avionics, health management, and controls have been directed towards IIVM. As this concept has matured, it has become clear the IIVM requires the same sensors and processing capabilities as the real-time avionics functions to support diagnosis of subsystem problems. New sensors have been proposed, in addition, to augment the avionics sensors to support better system monitoring and diagnostics. As the designs have been considered, a synergy has been realized where the real-time avionics can utilize sensors proposed for diagnostics and prognostics to make better real-time decisions in response to detected failures. IIVM provides for a single system allowing modularity of functions and hardware across the vehicle. The framework that supports IIVM consists of 11 major on-board functions necessary to fully manage a space vehicle maintaining crew safety and mission

  5. CMAM integration: Lessons learned from a case study on community-based child survival programmes in Bangladesh

    International Nuclear Information System (INIS)

    Sadler, Kate; Puett, Chloe; Myatt, Mark

    2014-01-01

    Bangladesh ranks among the five countries with the highest burden of acute malnutrition in the world. Barisal Division is one of the poorest areas of southern Bangladesh, with low access to health care and high prevalence of malnutrition. This prospective cohort study examined the effectiveness and feasibility of adding the diagnosis and treatment of severe acute malnutrition (SAM) to the community case management (CCM) package delivered by community health workers (CHWs) outside health facilities in Bhola District, Barisal Division. CHWs were paid a monthly stipend of 800 Taka (US$11.80). A mid-upper arm circumference measurement and an oedema check for all children under three years old were introduced into routine CHW activities, including monthly growth monitoring and promotion sessions and household visits. CHWs provided ongoing sensitization to households and community members on the causes and consequences of SAM, encouraging early treatment seeking. Integration into the CCM package of services supported high quality of care for cases of SAM, and promoted program effectiveness. The recovery rate (92%), length of stay (37.4 days) and rate of weight gain (6.7 g/kg/day) were all significantly better than international Sphere standards. Further, the coverage achieved by CHWs in this program was 89% (CI 78%–96%), one of the highest levels achieved by SAM treatment services. CHWs achieved high quality of care, with 89% of workers attaining 90% error-free case management or higher in managing cases of SAM. In receiving SAM treatment within a package of integrated services, children treated by CHWs in this study had low levels of complications and co-morbidities. Doorstep delivery promoted early treatment in this remote area. Therefore cases were easier to treat and average caseloads appeared to be manageable for CHWs. While SAM treatment increased CHW workloads, this did not negatively affect the quality of other preventive and curative services delivered

  6. PGPB's pipeline integrity management system

    Energy Technology Data Exchange (ETDEWEB)

    Urencio, Claudio; Sanchez, Luis; Moreno, Carlos [PGPB - Pemex Gas y Petroquimica Basica (Mexico)

    2005-07-01

    Pemex Gas has 12,134 km of natural gas transmission pipelines, 1,835 Km for LPG and 1,216 Km for basic petrochemicals. The must part of this infrastructure was built in the 70's and reaching their 35 years of operating life. To manage the integrity of the three systems, Pemex Gas has a portfolio of technological tools. This tools allow the Company to improves the decision taking, align the budget with their strategic goals, achieve efficient asset utilization, and increase the value generation. The process of integrity management starts with the risk evaluation on assets, with the use of a software called IAP (Integrity Assessment Program). This information is integrated to the SIIA (Assets Identification System). The results of both software are used to the construction of the Risk Atlas, which identifies graphically each pipeline segment, with their related risk and factors that influence their behavior. The Risk Atlas gives us information about the consequences to the people, environment and facilities, so we can design customized plans to prevent or mitigate emergencies. Finally a detailed analysis of the resulting information and scenarios simulations help us to determine the best investment projects that will minimize the risk through all our assets. (author)

  7. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  8. The UN Convention on International Watercourses and integrated water management: A bridge built

    Science.gov (United States)

    Tzatzaki, Vasiliki-Maria

    2008-11-01

    The UN Convention on the Law of the Non Navigational Uses of International Watercourses incorporates principles regarding the management of international water resources. The most important principles are the duty of the riparian states to cooperate, not to cause significant harm, to protect the aquatic environment and to utilize the watercourses reasonably and equitably. The lack of hierarchy between these principles signifies that the necessary step for the sound management of shared natural resources is an integrated approach, which takes into account economic development, human needs and environmental protection. Moreover, the UN Convention proved to be useful for the International Court of Justice (hereinafter ICJ) in the settlement of the Gabcikovo- Nagymaros dispute between Hungary and Slovakia for the Danube River. The Court highlighted the importance of the Convention by reminding the riparian states of their obligation to abide by its principles. On the other hand, the ICJ has used the principles of the Convention in the pending case of Pulp Mills between Uruguay and Argentina. This paper is going to show that the UN Convention is an international legal framework with general guidelines in order to create regional conventions, which promotes integrated water management as a solution to the emerging challenges of international water law and potential future conflicts.

  9. The UN Convention on International Watercourses and integrated water management: A bridge built

    International Nuclear Information System (INIS)

    Tzatzaki, Vasiliki-Maria

    2008-01-01

    The UN Convention on the Law of the Non Navigational Uses of International Watercourses incorporates principles regarding the management of international water resources. The most important principles are the duty of the riparian states to cooperate, not to cause significant harm, to protect the aquatic environment and to utilize the watercourses reasonably and equitably. The lack of hierarchy between these principles signifies that the necessary step for the sound management of shared natural resources is an integrated approach, which takes into account economic development, human needs and environmental protection. Moreover, the UN Convention proved to be useful for the International Court of Justice (hereinafter ICJ) in the settlement of the Gabcikovo- Nagymaros dispute between Hungary and Slovakia for the Danube River. The Court highlighted the importance of the Convention by reminding the riparian states of their obligation to abide by its principles. On the other hand, the ICJ has used the principles of the Convention in the pending case of Pulp Mills between Uruguay and Argentina. This paper is going to show that the UN Convention is an international legal framework with general guidelines in order to create regional conventions, which promotes integrated water management as a solution to the emerging challenges of international water law and potential future conflicts.

  10. 75 FR 27375 - Postal Rate Case Management

    Science.gov (United States)

    2010-05-14

    ... POSTAL REGULATORY COMMISSION [Docket No. PI2010-3; Order No. 456] Postal Rate Case Management AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is seeking comments relevant to management of an anticipated exigent postal rate case. It has scheduled a technical conference...

  11. Disaster Management: AN Integral Part of Science & Technology System and Land Administration-Management System

    Science.gov (United States)

    Ghawana, T.; Zlatanova, S.

    2016-06-01

    Disaster management is a multidisciplinary field, which requires a general coordination approach as well as specialist approaches. Science and Technology system of a country allows to create policies and execution of technical inputs required which provide services for the specific types of disasters management. Land administration and management agencies, as the administrative and management bodies, focus more on the coordination of designated tasks to various agencies responsible for their dedicated roles. They get help from Scientific and technical inputs & policies which require to be implemented in a professional manner. The paper provides an example of such integration from India where these two systems complement each other with their dedicated services. Delhi, the Capital of India, has such a disaster management system which has lot of technical departments of government which are mandated to provide their services as Emergency Service Functionaries. Thus, it is shown that disaster management is a job which is an integral part of Science & Technology system of a country while being implemented primarily with the help of land administration and management agencies. It is required that new policies or mandates for the Science and technology organizations of government should give a primary space to disaster management

  12. Water management as a key component of integrated weed management

    Directory of Open Access Journals (Sweden)

    Antonio Berti

    2010-09-01

    Full Text Available Water management within the cropping system is a key factor for an integrated weed management. Soil moisture affects seed persistence and seed dormancy, thus influencing their germination, the establishment of seedlings as well as the competition at adult stage and the number, vitality and dormancy of the new seeds produced by the weeds. The interactions among water availability and competition are very complex and still not fully understood. A research effort in this sector should the be very relevant for the development of new approaches of weed management, such as “Ecological weed management”, aiming to reduce weed density and competitiveness and, in the medium term, to prevent undesired modifications of the weed flora.

  13. Weather information integration in transportation management center (TMC) operations.

    Science.gov (United States)

    2011-01-02

    This report presents the results of the third phase of an on-going FHWA study on weather integration in Transportation Management Center (TMC) operations. The report briefly describes the earlier phases of the integration study, summarizes the findin...

  14. Evolution of river management: up to integrated and beyond?

    NARCIS (Netherlands)

    Straatsma, M.W.; Nooij, R.J.W. de

    2010-01-01

    Integrated river management is heralded as the new style of river management, but it has been preceded by a number of previous styles, and is unlikely to be the last. This article presents the first analysis of the evolution of river management using Spiral Dynamics (SD). SD provides a growth

  15. Integrated model for line balancing with workstation inventory management

    Directory of Open Access Journals (Sweden)

    Dilip Roy

    2010-06-01

    Full Text Available In this paper, we address the optimization of an integrated line balancing process with workstation inventory management. While doing so, we have studied the interconnection between line balancing and its conversion process. Almost each and every moderate to large manufacturing industry depends on a long and integrated supply chain, consisting of inbound logistic, conversion process and outbound logistic. In this sense an approach addresses a very general problem of integrated line balancing. Research works reported in the literature so far mainly deals with minimization of cost for inbound and outbound logistic subsystems. In most of the cases conversion process has been ignored. We suggest a generic approach for linking the balancing of the line of production in the conversion area with the customers’ rate of demand in the market and for configuring the related stock chambers. Thus, the main aim of this paper is to translate the underlying problem in the form of mixed nonlinear programming problem and design the optimum supply chain so that the total inventory cost and the cost of balancing loss of the conversion process is jointly minimized and ideal cycle time of the production process is determined along with ideal sizes of the stock chambers. A numerical example has been added to demonstrate the suitability of our approach.

  16. Curriculum Integration Using Enterprise Resource Planning: An Integrative Case Approach

    Science.gov (United States)

    Cannon, David M.; Klein, Helen A; Koste, Lori L.; Magal, Simha R.

    2004-01-01

    Efforts to achieve greater curriculum integration in schools of business have included team teaching, student group projects, multidisciplinary cases, and, more recently, the use of enterprise resource planning (ERP) systems. Although these approaches are beneficial, they tend to be implemented on an ad hoc basis rather than through curriculum…

  17. Training plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2013-01-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...

  18. Test report : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2015-05-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) : Demonstration Project for the Dallas region. Coordinated corridor operations and management is : predicated on being able to share transportation informa...

  19. Final report : Dallas Integrated Corridor Management (ICM) Demonstration Project.

    Science.gov (United States)

    2015-08-01

    The Dallas Area Rapid Transit (DART) is leading the US-75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...

  20. TWRS safety and technical integration risk management plan

    International Nuclear Information System (INIS)

    Fordham, R.A.

    1996-01-01

    The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making. The objective of this TWRS STI Risk Management Plan is to communicate a consistent approach to risk management that will be used by the organization

  1. INTEGRATION MECHANISMS OF IMPROVEMENT OF HUMAN RESOURCES MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Vera A. Akimenko

    2013-01-01

    Full Text Available In the current economic conditions, the efficiency of business processes of an organization is determined by the quality of the staff. Therefore, actual is the creation and application of new approaches to the management of human re-sources. The article presents a comparative analysis of management practices and their impact on the effectiveness of personnel management, the mechanism of their integration to improve the efficiency of the process.

  2. The Effect of Information Security Management on Organizational Processes Integration in Supply Chain

    Directory of Open Access Journals (Sweden)

    Mohsen Shafiei Nikabadi

    2012-03-01

    Full Text Available : The major purpose of this article was that how information security management has effect on supply chain integration and the effect of implementing "information security management system" on enhancing supplies chain integration. In this respect, current research was seeking a combination overview to these tow approaches (Information Security Management and Organizational Processes Integration by Enterprise Resources Planning System and after that determined factors of these two important issue by factor analysis. Researchers using a series of comments in the automotive experts (production planning and management and supply chain experts and caregivers car makers and suppliers in the first level and second level supply chain industry. In this way, it has been done that impact on how information security management processes enterprise supply chain integration with the help of statistical correlation analysis. The results of this investigation indicated effect of "information security management system" various dimensions that were coordination of information, prevent human errors and hardware, the accuracy of information and education for users on two dimensions of internal and external integration of business processes, supply chain and finally, it can increased integration of business processes in supply chain. At the end owing to quite these results, deployment of "information security management system" increased the integration of organizational processes in supply chain. It could be demonstrate with the consideration of relation of organizational integration processes whit the level of coordination of information, prevent errors and accuracy of information throughout the supply chain.

  3. Integrating a Procurement Management Process into Critical Chain Project Management (CCPM: A Case-Study on Oil and Gas Projects, the Piping Process

    Directory of Open Access Journals (Sweden)

    Sung-Hwan Jo

    2018-05-01

    Full Text Available Engineering, Procurement, and Construction (EPC of oil and gas megaprojects often experience cost overruns due to substantial schedule delays. One of the greatest causes of these overruns is the mismanagement of the project schedule, with the piping works (prefabrication and installation occupying a majority of that schedule. As such, an effective methodology for scheduling, planning, and controlling of piping activities is essential for project success. To meet this need, this study used the Critical Chain Project Management (CCPM to develop a piping construction delay prevention methodology, incorporating material procurement processes for EPC megaprojects. Recent studies indicate that the traditional scheduling method used on oil and gas mega projects has critical limitations regarding resource scarcity, calculation of activity duration, and dealing with uncertainties. To overcome these limitations, the Theory of Constraints-based CCPM was proposed and implemented to provide schedule buffers management. Nonexistent in literature, and of critical importance, is this paper’s focus on the resource buffer, representing material uncertainty and management. Furthermore, this paper presents a step-by-step process and flow chart for project, construction, and material managers to effectively manage a resource buffer through the CCPM process. This study extends the knowledge of traditional resource buffers in CCPM to improve material and procurement management, thus avoiding the shortage of piping materials and minimizing delays. The resultant process was validated by both deterministic and probabilistic schedule analysis through two case studies of a crude pump unit and propylene compressor installation at a Middle Eastern Refinery Plant Installation. The results show that the CCPM method effectively handles uncertainty, reducing the duration of piping works construction by about a 35% when compared to the traditional method. Furthermore, the

  4. Integrating Security Risk Management into Business Process Management for the Cloud

    OpenAIRE

    Goettelmann , Elio; Mayer , Nicolas; Godart , Claude

    2014-01-01

    International audience; Security issues are still preventing wider adoption of cloud computing, especially for businesses which are handling sensitive information. Indeed, by outsourcing its information system (IS), a company can lose control over its infrastructure, its software or even its data. Therefore, new methods and tools need to be defined to respond to this challenge. In this paper we propose to integrate Security Risk Management approaches into Business Process Management to effect...

  5. CPP-603 Underwater Fuel Storage Facility Site Integrated Stabilization Management Plan (SISMP), Volume I

    International Nuclear Information System (INIS)

    Denney, R.D.

    1995-10-01

    The CPP-603 Underwater Fuel Storage Facility (UFSF) Site Integrated Stabilization Management Plan (SISMP) has been constructed to describe the activities required for the relocation of spent nuclear fuel (SNF) from the CPP-603 facility. These activities are the only Idaho National Engineering Laboratory (INEL) actions identified in the Implementation Plan developed to meet the requirements of the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 to the Secretary of Energy regarding an improved schedule for remediation in the Defense Nuclear Facilities Complex. As described in the DNFSB Recommendation 94-1 Implementation Plan, issued February 28, 1995, an INEL Spent Nuclear Fuel Management Plan is currently under development to direct the placement of SNF currently in existing INEL facilities into interim storage, and to address the coordination of intrasite SNF movements with new receipts and intersite transfers that were identified in the DOE SNF Programmatic and INEL Environmental Restoration and Waste Management Environmental Impact Statement Record, of Decision. This SISMP will be a subset of the INEL Spent Nuclear Fuel Management Plan and the activities described are being coordinated with other INEL SNF management activities. The CPP-603 relocation activities have been assigned a high priority so that established milestones will be meet, but there will be some cases where other activities will take precedence in utilization of available resources. The Draft INEL Site Integrated Stabilization Management Plan (SISMP), INEL-94/0279, Draft Rev. 2, dated March 10, 1995, is being superseded by the INEL Spent Nuclear Fuel Management Plan and this CPP-603 specific SISMP

  6. AN ASSESSMENT OF THE INTEGRATED PEST MANAGEMENT ...

    African Journals Online (AJOL)

    Integrated Pest Management Collaborative Research Support Program) has been applying a farmer participatory IPM strategy at on-farm research sites in eastern Uganda since 1995. Following five years of project implementation an evaluation ...

  7. A dynamic multimedia fuzzy-stochastic integrated environmental risk assessment approach for contaminated sites management

    Energy Technology Data Exchange (ETDEWEB)

    Hu, Yan; Wen, Jing-ya; Li, Xiao-li; Wang, Da-zhou; Li, Yu, E-mail: liyuxx8@hotmail.com

    2013-10-15

    Highlights: • Using interval mathematics to describe spatial and temporal variability and parameter uncertainty. • Using fuzzy theory to quantify variability of environmental guideline values. • Using probabilistic approach to integrate interval concentrations and fuzzy environmental guideline. • Establishment of dynamic multimedia environmental integrated risk assessment framework. -- Abstract: A dynamic multimedia fuzzy-stochastic integrated environmental risk assessment approach was developed for contaminated sites management. The contaminant concentrations were simulated by a validated interval dynamic multimedia fugacity model, and different guideline values for the same contaminant were represented as a fuzzy environmental guideline. Then, the probability of violating environmental guideline (Pv) can be determined by comparison between the modeled concentrations and the fuzzy environmental guideline, and the constructed relationship between the Pvs and environmental risk levels was used to assess the environmental risk level. The developed approach was applied to assess the integrated environmental risk at a case study site in China, simulated from 1985 to 2020. Four scenarios were analyzed, including “residential land” and “industrial land” environmental guidelines under “strict” and “loose” strictness. It was found that PAH concentrations will increase steadily over time, with soil found to be the dominant sink. Source emission in soil was the leading input and atmospheric sedimentation was the dominant transfer process. The integrated environmental risks primarily resulted from petroleum spills and coke ovens, while the soil environmental risks came from coal combustion. The developed approach offers an effective tool for quantifying variability and uncertainty in the dynamic multimedia integrated environmental risk assessment and the contaminated site management.

  8. A dynamic multimedia fuzzy-stochastic integrated environmental risk assessment approach for contaminated sites management

    International Nuclear Information System (INIS)

    Hu, Yan; Wen, Jing-ya; Li, Xiao-li; Wang, Da-zhou; Li, Yu

    2013-01-01

    Highlights: • Using interval mathematics to describe spatial and temporal variability and parameter uncertainty. • Using fuzzy theory to quantify variability of environmental guideline values. • Using probabilistic approach to integrate interval concentrations and fuzzy environmental guideline. • Establishment of dynamic multimedia environmental integrated risk assessment framework. -- Abstract: A dynamic multimedia fuzzy-stochastic integrated environmental risk assessment approach was developed for contaminated sites management. The contaminant concentrations were simulated by a validated interval dynamic multimedia fugacity model, and different guideline values for the same contaminant were represented as a fuzzy environmental guideline. Then, the probability of violating environmental guideline (Pv) can be determined by comparison between the modeled concentrations and the fuzzy environmental guideline, and the constructed relationship between the Pvs and environmental risk levels was used to assess the environmental risk level. The developed approach was applied to assess the integrated environmental risk at a case study site in China, simulated from 1985 to 2020. Four scenarios were analyzed, including “residential land” and “industrial land” environmental guidelines under “strict” and “loose” strictness. It was found that PAH concentrations will increase steadily over time, with soil found to be the dominant sink. Source emission in soil was the leading input and atmospheric sedimentation was the dominant transfer process. The integrated environmental risks primarily resulted from petroleum spills and coke ovens, while the soil environmental risks came from coal combustion. The developed approach offers an effective tool for quantifying variability and uncertainty in the dynamic multimedia integrated environmental risk assessment and the contaminated site management

  9. Integration process and logistics results

    International Nuclear Information System (INIS)

    2004-01-01

    The Procurement and Logistics functions have gone through a process of integration since the beginning of integrated management of Asco and Vandellos II up to the present. These are functions that are likely to be designed for delivering a single product to the rest of the organization, defined from a high level of expectations, and that admit simplifications and materialization of synergy's as they are approached from an integrated perspective. The analyzed functions are as follows: Service and Material Purchasing, Warehouse and Material Management, and Documentation and General Services Management. In all case, to accomplish the integration, objectives, procedures and information systems were unified. As for the organization, a decision was made in each case on whether or not to out source. The decisive corporate strategy to integrate, resulting in actions such as moving corporate headquarters to Vandellos II, corporate consolidation, regulation of employment and implementation of the ENDESA Group Economic Information System (SIE) , has shaped this process, which at present can be considered as practically complete. (Author)

  10. INTEGRATED DOCUMENT MANAGEMENT SOLUTION FOR THE LOCAL GOVERNMENT

    Directory of Open Access Journals (Sweden)

    Nistor Razvan

    2013-07-01

    Full Text Available In this paper we present system analysis and design elements for the integrated document management solution at local governing authorities in the rural areas. While specifically dealing with the actual management of the Agricultural Register, an important primary unitary evidence document, we also keep a general character of the discussion, in order to argue for the generality of the proposed solution. Hence, for the identified and described problem space we propose an administrative and software infrastructure solution. This work is an empirical research in which our aim is primarily to identify key problems within the local governing authorities from several perspectives concerning the management of the Agricultural Register then to address those problems with an integrated document management system. For the proposed solution we give and argue the general system architecture and describe the key-mechanisms that support quality requirements. The relevance of this research concern is given by the impact of the actual Agricultural Register management on important stakeholders. This can be measured as the satisfaction felt by taxpayers and the performance of the local governing authorities, the Financial Administration, the Agency of Payments and Intervention in Agriculture and the Ministry of Agriculture and Rural Development. This work is also intended as a start-point for a new, modern thinking of the governing authorities in their pursue to improve public services. For this, in our work we highlight the importance of complete system analysis at all administrative levels as a main priority concern for all public managers. Our aim is the improvement of the public service by rising the awareness of the decision makers on the necessity of using integrated document management solutions for the provided services. Also, our work aims at increasing the efficiency with which nowadays, governing authorities invest public funds in various IT projects

  11. Integrated management of root-knot nematode (Meloidogyne ...

    African Journals Online (AJOL)

    Integrated management of root-knot nematode (Meloidogyne incognita) for tomato production and productivity. Bayuh Belay1* ... important food and cash crop of the farmers and is ...... some part of the research budget without any reservation.

  12. How Multilevel Societal Learning Processes Facilitate Transformative Change: A Comparative Case Study Analysis on Flood Management

    Directory of Open Access Journals (Sweden)

    Claudia Pahl-Wostl

    2013-12-01

    Full Text Available Sustainable resources management requires a major transformation of existing resource governance and management systems. These have evolved over a long time under an unsustainable management paradigm, e.g., the transformation from the traditionally prevailing technocratic flood protection toward the holistic integrated flood management approach. We analyzed such transformative changes using three case studies in Europe with a long history of severe flooding: the Hungarian Tisza and the German and Dutch Rhine. A framework based on societal learning and on an evolutionary understanding of societal change was applied to identify drivers and barriers for change. Results confirmed the importance of informal learning and actor networks and their connection to formal policy processes. Enhancing a society's capacity to adapt is a long-term process that evolves over decades, and in this case, was punctuated by disastrous flood events that promoted windows of opportunity for change.

  13. Strategic plan modelling by hospital senior administration to integrate diversity management.

    Science.gov (United States)

    Newhouse, John J

    2010-11-01

    Limited research suggests that some hospital senior administrators and chief executive officers (CEOs) have employed a strategic planning function to achieve diversity management practices. As the hospital industry struggles with how to integrate diversity practices to improve patient satisfaction, increase the quality of care and enhance clinical outcomes for minority populations, understanding the planning process involved in this endeavour becomes significant for senior hospital administrators. What is not well understood is what this strategic planning process represents and how it is applied to integrate diversity management. Scant research exists about the type of strategic models that hospital CEOs employ when they wish to reposition their organizations through diversity management. This study examines the strategic planning models used by senior administrators to integrate diversity management for an institutional-wide agenda. A qualitative survey process was used for CEOs in the states of New York, Pennsylvania, New Jersey and Delaware. The key research questions dealt with what type of strategic plan approach senior administrators used for integrating diversity management and what rationale they used to pursue this. Significant differences were reported between three types of strategic plan modelling used by CEOs. Also, when comparing past and current practices over time, such differences existed. The need to integrate diversity management is underscored by this study. How senior hospital administrators apply strategic plan models and what impact these approaches have represent the major implications that this study offers.

  14. The quality management system in leading organization of the integrated structure

    Directory of Open Access Journals (Sweden)

    Kunitsyn A. M.

    2018-02-01

    Full Text Available the article has analyzed the problem of integrated structure management. The author has noted that the implementation of recommendations outlined in the article will allow building and improving the quality management system in leading organization of integrated structure on a regular basis that meets the requirements.

  15. The Integrative University: Why University Management Is Different

    Science.gov (United States)

    Temple, Paul

    2008-01-01

    Managing universities "is" different from managing in most other sorts of organisation. In this article, the author shows why this claim is more than just special pleading, and how it relates to the particular form of the organisation. Appreciating their integrative aspects helps people to understand some of the difficulties that they regularly…

  16. Pesticides and public health: integrated methods of mosquito management.

    OpenAIRE

    Rose, R. I.

    2001-01-01

    Pesticides have a role in public health as part of sustainable integrated mosquito management. Other components of such management include surveillance, source reduction or prevention, biological control, repellents, traps, and pesticide-resistance management. We assess the future use of mosquito control pesticides in view of niche markets, incentives for new product development, Environmental Protection Agency registration, the Food Quality Protection Act, and improved pest management strate...

  17. The importance of work or productive activity in life care planning and case management.

    Science.gov (United States)

    Reid, Christine; Riddick-Grisham, Susan

    2015-01-01

    The importance of work or productive activity for the well-being, community integration, and quality of life of people living with disabilities is addressed, with implications for life care planning and case management. The role of work or productive activity in our society, and consequences of deprivation if rehabilitation services do not address vocational effects of disabilities, is explored. A continuum of productivity options is introduced; types of vocational rehabilitation assessment processes and interventions are described. The role of vocational rehabilitation services in life care planning and case management is discussed, focusing on quality of life for people living with disabilities. Rehabilitation and health care professionals should understand the importance of work or other productive activity, and support the development of appropriate plans to address those needs among people who have disabilities.

  18. QUANTITATIVE СHARACTERISTICS OF COMPLEMENTARY INTEGRATED HEALTH CARE SYSTEM AND INTEGRATED MEDICATION MANAGEMENT INFORMATION SYSTEM

    Directory of Open Access Journals (Sweden)

    L. Yu. Babintseva

    2015-05-01

    i mportant elements of state regulation of the pharmaceutical sector health. For the first time creation of two information systems: integrated medication management infor mation system and integrated health care system in an integrated medical infor mation area, operating based on th e principle of complementarity was justified. Global and technological coefficients of these systems’ functioning were introduced.

  19. The integration of studio cycling into a worksite stress management programme.

    Science.gov (United States)

    Clark, Matthew M; Soyring, Jason E; Jenkins, Sarah M; Daniels, Denise C; Berkland, Bridget E; Werneburg, Brooke L; Hagen, Philip T; Lopez-Jimenez, Francisco; Warren, Beth A; Olsen, Kerry D

    2014-04-01

    High stress is a prevalent problem in the worksite. To reduce stress, improve productivity, reduce absenteeism, and lower healthcare costs, many companies offer exercise classes or stress management programmes. Although physical activity is an important component of stress management, few worksites have integrated physical activity into their comprehensive stress reduction programmes. The purpose of this single-arm pilot project was to examine the potential effectiveness of an integrated exercise (studio cycling) and cognitive-behavioural stress management programme. Eighty-four adults, 75% female, mostly aged 40+ years, participated in an integrated 12-week cycling studio and cognitive-behavioural stress management programme. Participants experienced a significant and clinically meaningful reduction on the Perceived Stress Scale (p manage stress at the programme's end and at a 1-month follow-up. Participants also reported having significantly improved overall health, improved nutritional habits, higher physical activity level, greater confidence in their ability to follow a healthy diet, higher spiritual well-being, improved sleep, receiving more support for maintaining healthy living and improved quality of life at the completion of the 12-week programme and 1-month follow-up. These findings provide further support for an integrated exercise and stress management programme. © 2013 John Wiley & Sons, Ltd.

  20. Management of information in development projects – a proposed integrated model

    Directory of Open Access Journals (Sweden)

    C. Bester

    2008-11-01

    Full Text Available The first section of the article focuses on the need for development in Africa and the specific challenges of development operations. It describes the need for a holistic and integrated information management model as part of the project management body of knowledge aimed at managing the information flow between communities and development project teams. It is argued that information, and access to information, is crucial in development projects and can therefore be seen as a critical success factor in any development project. In the second section of the article, the three information areas of the holistic and integrated information management model are described. In the section thereafter we suggest roles and actions for information managers to facilitate information processes integral to the model. These processes seek to create a developing information community that aligns itself with the development project, and supports and sustains it.